ENYIROMMENTAL PROTECTION AGENCY

                               1963 Budget Estimate

                                Table of Contents
Summary                                                                  I-XIII

Air                                                                      A-l

     Research and Development                                    .
          Oxidants Non-Energy	   A-14
          Hazardous Air Pollutants Non-Energy	   A-30
          Mobile Sources Non-Energy..........	   A-44
          Gases and Particles Non-Energy.	,	   A-57

     Abatement and Control
          Air Quality and Stationary Source Planning
            and Standards.	 -	..   A-74
          Mobile Source Air Pollution Control and
            Fuel  Economy	•	   A-81
          State Programs Resource Assistance..	   A-91
          Air Quality Management Implementation....	   A-96
          Trends Monitoring  and Progress Assessment	   A-101

     Enforcement
          Stationary Source Enforcement	   A-l06
          Mobile Source Enforcement....	   A-113


Water Quality                                                          WQ-1

     Research and Development
          Water Quality Non-Energy.	WQ-U
          Municipal Wastewater Non-Energy	,	 WQ-29
          Industrial Wastewater Non-Energy	 WQ-42

     Abatement and Control
          State Programs Management	WQ-53
          Effluent Standards and Guidelines....	 UQ-64
          Grants Assistance  Programs....	WQ-70
          Water Quality Strategies Implementation	 WQ-77
          Water Quality Monitoring and Analysis	 HQ-91
          Municipal Source Control	 UQ-97

     Enforcement
          Water Quality Enforcement.	WQ-109
          Pernri ts Issuance	 WQ-116

Drinking Water                                                         DW-1

     Research and Development
          Drinking Water Non-Energy	,	DW-11

     Abatement and Control
          Criteria, Standards,  and Guidelines.,	 DW-27
          State Program Resource Assl stance	 DW-33
          Dr inking Water Management.			DW-39

     Enforcement
          Drinking Water Enforcement		......	 DW-46

-------
                                                                      Page

HazardousWaste                                                        HW-1

     Research and Development
          Hazardous Waste Non-Energy	HW-14

     Abatement and Control
          Waste Management Regulations, Guidelines, and Policies...... HW-31
          Financial Assistance	 HW-39
          Waste Management Strategl es Irnpl anentatl on....	 HW-44
          Technical Assistance	 HW-51
          Uncontrol led Hazardous Waste 51 tes.	 HW-56

     Enforcement
          Hazardous Waste Enforcement	 HW-59


Pesticides                          '                                    p-l

     Research and Development
          Pesticides Non-Energy	  P-12

     Abatement and Control
          Registration, Special Registration and
            tolerances.	  P-24
          Standards Setting and RPAR	»	.	....  P-32
          Federal and State Program Support	  P-40

     Enforcement
          Pesticides Enforcement.	  P-44


Radiation                                                               R-1

     Research and Development
          Non-Ionizing Radiation Non-Energy...	  R-7

     Abatement and Control
          Radiation Policy Council.	  R-15
          Criteria, Standards, and Guidelines.	  R-l7
          Program Implementation	  R-21
          Environmental Impact Assessment.	..	  R-24


Ng1 se                                                                   N-l

     Abatement and Control
          Environmental Noise Strategies and Standards	  N-6
          Noise Program Strategies and Implementation	  N-l2

     Enforcement
          Noise Enforcement....	  N-l8
                                     11

-------
 Interdisciplinary                                                          i-i

     Research  and Development
           Intermedia Non-Energy.	  1-9

     Abatement and Control
           EIS  Review and New Source EIS Preparation..	  1-18
           Accelerated Review and Permitting	  1-23

     Enforcement
           Enforcement Policy and Technical Support.	  1-26


 Toxic Substances                                                          TS-1

     Research  and Development
           Chemical Testing and Assessment Non-Energy	TS-11

     Abatement and Control
           Tox1 c Substances Strategies	TS-35

     Enforcement
           Toxl c Substances Enforcement.	 TS-48


 Energy                                                                     E-l

     Research  and Development
           Multi-Media Energy...	,	  E-9
           Oxldants Energy.,	,	,	  E-26
           Gases and Particles Energy.	,	  E-33
           Hazardous A1 r Pol lutants Energy	,	  E-45
           Mater Quality Energy..	  E-52
           Drinking Water Energy......	  £-57
           Industrial Uastewater Energy	  E-59
           Solid Waste Energy...	  E-63
           Chemical Testing and Assessment Energy	  E-66
           Municipal Spills Energy	  E-70


Management and Support                                                    MS-1

     Program Management— ,		,	 MS-8

     Agency Management
           Office of Administrator/Executive Offices	MS-17
           Office of Legal  and Enforcement Counsel.....	MS-41
           Office of Policy and Resource Management	 MS-48
           Office of Administration	,	 MS-61

     Reg1 onal Management.	,	MS-75

     Support Services........	".	MS-84


Buildings and Facilities                                                  BF-1


Construction Grants                                                       CG-1
                                      111

-------
Super-Fund
     Research and Development
          Hazardous Substance Non-Energy.
     Enforcement

          Super-fund Enforcement	 SF-24

     Management and Support	... SF-31

     Hazardous Substance Response Actions
          Haza rdous Substance Response Actions.	 SF-51
          USCG Oil Pollution Fund		,		,. SF-60
          Interagency Support.	 SF-57


Special Analyses                                                         SA-1
                                        iv

-------
Summary
   SECTION TAB

-------
• Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                                  BUDGET SuTWRY


     The President's  request for  the U.  S.  Environmental  Protection  Agency's
1983 budget  totals  SI,191,392,000  and  8,645  permanent  workyears,  Including
$961.392,000 and 8,128.6 permanent workyears for the Agency's operating programs,
and $230,000,000 and  516.4 permanent workyears  for the Superfund  program.   New
budget authority In the  amount  of 52,400,000,000 is requested  for  the municipal
waste treatment  facilities  construction  program.   Including  Superfund,  these
-totals constitute  a  decrease of  $84,620,000 and 1,176  permanent  workyears  for
1983.  The budget  also  requests supplemental authority of $2,400,000,000 1n 1982
for the construction grant program.

     Major emphasis  continues  1n  the Superfund  and  Hazardous Waste  programs.
Funding for  the  Superfund program Increases by  $40,000,000 and 13.4  permanent
workyears to $230,000,000  and  516.4 permanent  workyears 1n 1983.   Although  the
funding levels for the  Hazardous  Waste program appear to  decrease,  when adjust-
ments are made  for program  activities  which were  discontinued at the  close  of
fiscal year  1981,  there  are  actually more resources devoted to  hazardous  waste
management in 1983 than in 1981.

     Implementation of  a  major reorganization  of  our  enforcement program  Is
designed to  enhance  the  efficiency  and  quality  of  the  Agency's  enforcement
activities.  Litigation actlvites  have been centralized and technical  case pre-
paration activities are  now located  in  the  appropriate program offices.   This
will Improve  top  management  review  of  enforcement  policy  while  increasing
coordination of technical work at the program level.

     Research and  development  activity  will  focus  on  programs  designed  to
emphasize results  which  relate  directly  to  the Agency's  regulatory programs  and
the Nation's environmental problems.   Priority will  be placed on  improving  the
scientific basis for permits  and  regulations, effectively using research to meet
statutory deadlines,  and  providing  State  and  local   governments  with  useful
research Information.   Our  request  for  research  activities  in  1983  Includes
$200,826,700 and  1,228.8 permanent  workyears,  a  reduction  of $55,334,900  and
226.3 permanent workyears from 1982.

     Grants to  State  and  local  governments  are  at a  level  of  £181,955,500,  a
reduction of $54,728,800 from 1982.  The reduction does  not  represent a decrease
In EPA's  commitment  to the States  as  partners  1n  environmental  protection.
Rattier, the  decrease  occurs  from  simplification  of administrative requirements,
elimination of duplication in grant processes and reduction in regulatory demands.

Appropriation Simiary

     A summary of  budget authority for  EPA's six  appropriation accounts  is  as
fol 1ows:

                      EPA's Request by AppropriationAccount

                                           1982              1983
                                     Current Estimate   Budget Estimate

Salaries & Expenses	      S555.105,700       $538,113,200
Abatement. Control S Compliance..       372.969,700        311,575,000
Research ft Development	       154,315,600        108,703,800
Building S Facilities	„—         3,621.000          3.000,000

     Operating Programs Subtotal.    SI,086,012,000  .     $961,392,000

-------
Construction Grants ..............    $2,400,000,000      2,400,000,000
Hazardous Substance Response
  Trust Fund ............... .......      $190,000,000       $230,000,000

     Total ..... . ...... , ....... ...    $3,676,012,000     $3,591,392,000

     The following briefly  describes  the content  of  each appropriation  and the
changes requested within each from the Agency's current 1982 estimates.
     EPA requests a  decrease of  $16,992,500  for Its  Salaries and Expenses  ap-
propriation which finances  salaries and  related  costs associated  with adminis-
tering the programs within the Environmental Protection Agency.   It Incorporates
all costs  exclusive  of  grant programs  and  program-specific  contractual  agree-
ments.  The  decrease  reflects  the  reduced  workyear  levels.   In 1983,  major
emphasis Includes support for hazardous waste regulatory reform efforts, facility
permitting and  compliance  Inspections, and  Interdisciplinary  enforcement policy
direction and Integration.

Abatement, Control and Compliance

     The Abatement,   Control  and   Compliance  appropriation  finances  contracts,
grants, and  cooperative agreements  for  pollution  abatement,  control  and  com-
pliance activities*    EPA requests  a decrease  of 561,394,700  in 19S3 for  this
appropriation which  reflects the  elimination   of Clean  Lakes grants,  drinking
water special  studies  and  demonstrations,  and  toxic  substances  enforcement
grants.  Other  decreases are due to  reductions  In  contracting  for  stationary
source enforcement,   TSCA  Information   and   noise.   Program   priorities  Include
Increases for  hazardous waste  contracting,  pesticides  review and registration
and accelerated review and permitting.

Research and Devel opment

     The 1983  budget  decreases  the Research  and  Development appropriation  by
$45,611,800 to $108,703,800.  This decrease primarily occurs because of
completion of  several   research  efforts  In  the  water  quality,  drinking  water,
toxic substances  and  energy programs,  as  well  as efficiencies  1n  scheduling
research and  reductions  1n  areas  that were not  cost-effective.   Major  program
emphasis continues for add rain  and  ground  water protection,  as well  as  for
development of  a  firm  scientific  basis  for hazardous  waste  regulations,  toxic
chemical review and  assessment procedures  for  evaluating the  environmental  and
public health Impacts from the use of pesticides.

Buildings and Facilities

     EPA requests  $3,000,000,  a   decrease  of  $621,000,   for  the  Building  and
Facilities appropriation  which  finances  the  construction,  repair, Improvement,
extension, alternation,  and purchase  of  fixed  equipment  of  facilities  owned,
as well as existing  facilities  occupied  by the Environmental  Protection  Agency.
The funds  in  1983  will  help  correct health  and  safety deficiencies  in  EPA
laboratories and  prevention  of  serious  deterioration,   or   pollution  control.

Construction Grants

     The Construction Grants appropriation 1s for grants to local  public agencies
for construction  of  municipal  wastewater treatment facilities to  assist States
and localities in attaining water quality standards.

     In 1981 Congress enacted significant reforms proposed by the Administration.
These reforms provide  for  a more  cost-ef f ectl ve program and reduce the long-term
requirements for Federal assistance.  Under the reforms, Congress provided a four
year authorization at $2,400,000,000.   As  a  result of  passage  of the reforms,
                                       II

-------
the Agency has requested a  supplemental  appropriation  of $2,400,000,000 in 1982.
This request, in addition to the $1,000,000,000 available  from  prior  year appro-
priations, will  provide approximately 53,400,000,000 for obligation In  1982.   In
1983, the Agency 1s requesting $2,400,000,000 to obligate  funds  for 661  new Step
3 awards.

Hazardous Substance Response Trust Fund

     The 1983 budget  requests  $230,000,000 an  Increase  of $40,000,000  and 13.4
permanent workyears to  support the Hazardous Substance Response Trust  Fund.   In
1983 these funds  will  be dedicated to  responding  to the most  serious  hazardous
waste incidents,  actively  pursuing  Increased  State   Involvement  in   specific
response phases,  adapting  existing  research  and  development   data  to  support
field response activities,  continuing effective enforcement  activity,   and sup-
porting on-going activities of other Federal agencies.
                                       Ill

-------
                                            ENVIROWENTAL PROTECTION AGENCY

                                              Summary of Budget Authority,
                                           Obligations,  Outlays and Workyears
                                                    By Appropriation
                                                 (dollars In thousands)
                                                    Actual
                                                     1981
                                                                January
                                                               Estimate
                                                                 1982
                                 March
                               Estimate
                                 1982
                                Current
                               Estimate
                                 1982
                               Estimate
                                 1983
Research a nd Bevel opulent
  Budget Authority...",..""-.
  Obligations	
  Outlays	
Abatement, Control and Compliance
.....       ''"1'""  '"'''"'
  Obi Igatlons.
  Outlays ..... ..... .
  Pe rma fren t Ful 1 - t 1 me Ho rityea r s .
  Total Workyears. . ..... ......
Salaries and Expenses
    	xpens
TTudget Authority.
 Obligations	
  Outlays.
  Permanent Full-time Workyears.
  Total Uorkyears	
Buildings and Facilities
  Budget Authority.
  Obligations.	
  Outlays.....	
Construction Grants
  Budget AuthorityV.
  Obligations	
  Outlayi...........
                                               $250,485.7
                                                198,606.9
                                                247,008.2
                                                534,794.0
                                                522,513.2
                                                559,390.2
                                                      * * •
                                                     34.2
561,693.9
549,030.2
543,377.8
 10,377.2
 12,641.0
                                                  4,115.0
                                                  3,104.4
                                                  1,454.5
                                              1,604,837.0
                                              3,941,567.1
                                              3,881,172.7
              $229,355.0
               227,229.0
               230,886.0
               492,072.0
               497,084.0
               504,133.0

                   161.8
645,618.0
645,618.0
661,561.0
 10,965.1
 13,459.8
                 6,646.0
                 6,367.0
                 3,965.0
             3,700,000.0
             4,950,000.0
             4,230,000.0
              $190,635.0
               188,509.0
               213,000.0
               413,928.0
               418,940.0
               465,000.0
582,769.0
582,769.0
614,122.0
  9,825.2
 12,208.7
                 4,115.0
                 4,837.0
                 3,700.0
             1,100,000.0
             3,840,000.0
              $154,315.6
               188,509.0
               206,464.0
               372,969.7
               395,250.0
               453,435.0
555,105.7
555,105.7
597,512.0
  9,259.2
 11.509.2
                 3,621.0
                 4,837.0
                 3,537.0
             2,400.000.0
             3.409,458.0
             4,050,000.0
              $108,703.8
               130,260.0
               165,648.0
               311,575.0
               320,408.0
               387,165.0
538,113.2
538,113.2
548,869.0
  8,069.8
  9,821.0
                 3,000.0
                 3,864.0
                 3,559.0
             2.400,000.0
             2,400,000.0
             3,350,000.0

-------
                                                    Actual
                                                     1981
                January
               Estimate
                 1982
                               March
                             Estimate
                               1982
                              Current
                             Estimate
                               1982
                              Estimate
                                1983
Scientific Activities Overseas
  Budget Authority.
  Obligations	
  Outlays..........
Operations. Research and Facilities
  Obligations...........-............
  Outlays	--.	
Revolving Fund
  obligations,.
  Outlays	
Enforcement
  outlays.
U.S. Regulatory Council
  Budget Authority....... .....
  Obi i cations ..... . . . . . .........
  Outlays ............... . .......
  Permanent Full-time Horkyears.
  Total Horkyears..... ..... .....
Trust Funds
  Budget Authorlty.
  Obligations......
  Outlays	.....
Reimbursements
  Obligations....	
  Permanent Full-tine Horkyears.
  Total Workyears.	
   162.0
 1,156.7


   589.1
 2,257.6
   501.0
   -63.0
 3,189.9
2,500.0
2,412.2
2,254.8
   10.0
   24.1
   12.0
    3.0
    2.3
21,269.5
    54.6
    62.9
                 805.0
               1,300.0
               2,000.0
                 700.0
                 100.0
2,580.0
2,580.0
3,000.0
   11.0
   26.0
                   20.0
              30,000.0
                  62.6
                  71.6
                805.0
              1,300.0
              2,000.0
                700.0
                100.0
1,030.0
                 25.0
                 20.0
             30,000.0
                 58.8
                 67.8
                  805 !6
                1,300.0
                1,442.0
                2,000.0
                  700.0
                  100.0
                                             3,088.0
                                                613.0
                   25.0
                   20.0
               30,000.0
                   58.8
                   67.8
   700.0
 1,200.0
   500.0
   700.0
   100.0
    25.0
    20.0
30,000.0
    58.8
    67.8

-------
                                                    Actual
                                                     1981
                Ja nua ry
               Estimate
                 1982
                  March
                Estimate
                  1982
                 Current
                Estimate
                  1982
                Estimate
                  1983
Hazardous Substance Response
 Trust fund
  Budget Authorl ty..............
  ObiIgatlons	
  Outlays	
  Permanent Full-time Work years.
  Total Workyears	
Payment to Hazardous Substance
 Response 1 rust t-umf
  Budget Authority...	
  Obi Igatlons	
  Outlays...	
Total, Environmental Protection
 Agency
  Budget Authorl ty	•-.	
  Obi Igatlons.	...	
  Outlays	
  Permanent full-time Workyears.
  Total Workyea rs	
74,742.9
40,283.1
 8,038.7
    67.3
    7S.3
(9,000.0)
(9.000.0)
(9.QOO.O)
250,000.0
250,000.0
164,000.0
    635.0
    730.0
200,000.0
200,000.0
 84,000.0
    503.0
    584.0
$3.033,180.5
5,280,041.7
5,249,240.4
10,509.1
12,837.5
$5,326,271 .0
6.610,408.0
5.800,965.0
11,673.7
14,449.2
$1,391,447.0
2,526,585.0
5,224,272.0
10,387.0
12,860.5
190,000.0
190,000.0
117,743.0
    503.0
    584.0
                              (26,600.0)
                              (26,600.0)
                              (26,600.0)
230,000.0
230,000.0
188,000.0
    516.4
    592.2
                              (44,000.0)
                              (44,000.0)
                              (44,000.0)
                                         $3,676,012.0   $3,591,392.0
                                          4,776,131.7    3,654,070.2
                                          5,435,812.0V 4,645,061.0
                                              9.821.0        8,645.0
                                             12,161.0       10,481.0

-------
                                            ENVIROWENTAL PROTECTION AGENCY

                                              Summary of Budget Authority,
                                           Obligations, Outlays and Uorkyears
                                                        By Media
                                                 (dollars in thousands)
Air
  Budget Authority.	
  Obligations.	
  Outl ay s	
  Permanent Full-time Uorkyears.
  Total Uorkyears..,.	
Hater Quality
  tJudget Authority	
  Obi tgatfons.	...	
  Outlays	
  Permanent Full-time Work years.
  Total Morkyears..^	
Drinking Water
  Budget Authority..	
  Obi 1 ga tions	
  Outl ays	
  Permanent Full-time Uorkyears.
  Total Workyears	
Hazardous Waste
  Budget Authority	
  Obi Iga tions	
  Outl ay s	
  Permanent Full-time Uorkyears.
  Total Workyears	
    Actual
     1981

$244,934.6
 235,388.5
 247,040.7
   1,753.8
   2,087.2
 334,348.5
 318,236.9
 343,398.4
   2,781.7
   3,352.5
  82,893.2
  79,329.7
  87,824.5
     492.4
     590.5
 150,475.2
 141,427.7
 157,182.5
     725.4
     916.7
   January
  Estimate
    T982

$255,220.9
 252,772.0
 287,832.0
   1,912.5
   2,286.2
 297,534.0
 298,428.0
 409,337.0
   2,856.6
   3,494.6
  91,672.1
  93,198.0
  71,666.0
     550.0
     672.4
 143,336.3
 146,762.0
  83,802.0
     713.3
   1,036.6
     March
   Estimate
     1982

 $238,167.7
  236,674.0
,  266,257.0
    1,746.4
    2,037.2
  246,237.1
  248,227.0
  378.677.0
    2,401.8
    2,993.3
   87,646.1
   89,192.0
   66,353.0
      514.1
      635.1
  118,840.2
  123,227.0
   77,583.0
      642.8
      863.9
   Current
  Estimate
    1982

$219,761.9
 228,141.0
 257,340.0
   1,642.0
   1,927.4
 236,796.7
 248,598.0
 273,429.6
   2,246.3
   2,787.4
  83,831.1
  87,119.0
  97,944.7
     499.4
     620.6
 107,228.1
 114,087.0
 125,666.8
     609.5
     822.8
  Estimate
    1983

$184,053.3
 188,611.0
 218,492.5
   1,333.2
   1,549.4
 185,965.7
 192,294.0
 212.286'.5
   1,849.5
   2,292.0
  59,750.1
  71,783.0
  83,882.7
     455.5
     550.8
 103,343.7
 106,408.0
 124,857.6
     557.0
     740.1

-------
Pesticides
  Budget Author)ty	
  Obligations.....		
  Outlays	
  Permanent Full-time Workyears.
  Total Workyears	
Radiation
  [fudge t Authori ty.
  Obligations...*..
  Outlays.
  Permanent Full-time Workyears.
  Total Workyea rs,	
Noise
  Bulge t Authority	
  Obligations.........	
  Outlays	,	
  Permanent Full-time Horkyears.
  Total Workyears..	
 Interdisciplinary
•  budget Authority	
  Obligations....	
  Ou tl ay s	
  Permanent Full-time Morkyears.
  Total Workyears,	-.-...
Toxic Substances
  Budget Authori ty.
  Obligations.
  Outlays	
  Permanent Full-time Morkyears.
  Total Workyears...............
                                                    Actual
                                                     1981
 69,199,2
 64,769.8
 58,120.1
    887.0
    967.4
 13,403.7
 14,228.6
 12,998.3
    187.3
    218.4
 12,958.1
 12,207.1
 13,210.2
     89.3
    128.3
 14,388.0
 13,915.9
 14,558.4
    186.9
    226.3
103,168.8
 94,103.8
 97,146.6
    690.7
    830.3
                 January
                Estimate
                  1982
 72,133.7
 73,125.0
 68,919.0
    874.1
    993.8
 16,969.9
 16,970.0
 17,082.0
    206.0
    241.6
 12,759.3
 12,759.0
 13,356.0
     93.5
    142.9
 16,011.1
 15,085.0
 32,822.0
    144.0
    178.0
107,640.7
107,065.0
 68,394.0
    796.7
    912.7
                  (torch
                Estimate
                  1982
§1,788.1
63.060.0
63,320.0
   810.9
   926.2
12,887.8
12,888.0
IB,705.0
   160.0
   191,4
 2,271.4
 2,271.0
12,060.0
    29,2
    42.9
18,993.4
14,418.0
30,602.0
   206,8
   259,0
97,816.3
97,577.0
63,500.0
   731.7
   836.8
                Current
               Estimate
                 1982
53,738.1
56,606.0
60,903.5
   744.6
   854.4
10,378.7
10,826.0
11,424.0
   149.3
   178.6
 2,010.6
 2,597.0
 2,189.4
    25.2
    37.7
17,717.9
17,941.0
20,047.1
   196.4
   246.8
77,377.8
86,712.0
8B.528.4
   686.5
   783.7
               Estimate
                 1983
50,782.0
52,271.0
57,244.4
   660.9
   744.5
10,351.1
10,588.0
11,147.0
   135.1
   159.9
    40.0
   350.0
20,738.1
20,865.0
22,853.0
   310.3
   363.7
68,604.0
73,155.0
80,130.3
   607.7
   687.7

-------
Energy
  Buffet Author 1 ty..............
  Obi 1 ga tlons	
  Outl ays	
  Permanent Full-time Workyearrs.
  Total No rkyea rs	
Management and Support
  budget Authority...................
  Obligations.......,.,....,.,..,....
  Outlays	
  Permanent Full-time Uorkyears......
  total Morkyea rs	

Bull dines and Facilities
     ing!
     get
Budget. Autnori ty.
Obligations......
Outlays	
Operations, Research and Facilities
  Obligations.....;	
  Outl ays	.	
Construction Grants
  Budget Authority..
  Obligations	
  Outlays....	
Scientific Activities Overseas
  Budget Authority.
  Obligations......
  Outlays	
Revolving Fund
  obligations..
  Outlays......
                                                    Actual
                                                     1981
                                               104,529,6
                                                84,564.2
                                               111.730.0
                                                   147.5
                                                   219.5
                                               216,674.7
                                               211,978.1.,
                                               209,72O5
                                                 2,435.2
                                                 3,130,1
4,115.0
3,104.4
1,454.5
                                                   589.1
                                                 2,257,6
                                             1,604,837.0
                                             3,941,567.1
                                             3,881,172.7
                                                   162.0
                                                 1,156.7
                                                   501.0
                                                   -63,0
                                                                January
                                                               Estimate
                                                                 1982
              96,845.3
              96,845.0
             118,439.0
                 142.4
                 241 -.7
             256,921.7
             256,922.0
             224,931.0
               2,676.0
               3,421.1
6,646.0
6,367.0
3,965.0
               2,000.0
           3,700,000.0
           4,950,000.0
           4,230,000.0
                 805.0
               1,300.0
                 700.0
                 100.0
                               March
                             Estimate
                               1982
              70,145.9
              70,146.0
             109,264.0
                 144.9
                 244.2
             232,538.0
             232,538.0
             208,801.0
               2,436.6
               3,178.7
4,115.0
4,837.0
3,700.0
               2,000.0
           1,100,000.0
           3,840,000.0
                 805.0
               1,300.0
                 700.0
                 100.0
                              Current
                             Estimate
                               1982
              52,492.3
              65,179.9
              85,557.0
                 131,9
                 213.2
             221,057.8
             221,057.8
             237,468.5
               2,328.1
               3,036.6
3,621.0
4,837.0
3,537.0
               1,442.0
               2,000.0
           2,400,000.0
           3,409,458.0
           4,050,000.0
                 805.0
               1,300.0
                 700.0
                 100.0
                             Estimate
                               1983
              34,530.2
              42,492.4
              55,501.0
                  61,8
                 100.1
             230,273.8
             230,273.8
             234,938.0
               2,098.8
               2(632.8
3,000.0
3.864.0
3,559.0
                 500.0
           2,400,000.0
           2.400,000.0
           3,350,000.0
                 700.0
               1,200.0
                 700.0
                 100.0

-------
Trust Funds
  Budget Authority.
  Obligations......
  Outlays	
Reimbursements
  Obligations	
  Permanent Full-time Workyears,
  Total Horkyears	
U.S. Regulatory Council
     Reg
     pf
  Budget Authon ty.	
  Obi Iga tlons	
  Outlays.	
  Permanent Full-tine Workyears.
  Total Workyears...............
Hazardous Substance Response Trust
 Fund
 ""Budget Authority....	
  Obi 1 ga tlons	
  Outlays.	
  Permanent Full-time Workyears....
  Total Workyears...	
Payment to Hazardous Substance
 Response Trust Fund
  Budget "Authority..-.	
  Obi iga tlons.	
  Out!ay s	
Total Environmental Protection Agency
  Budget Authori ty	,	
  Obligations	
  Ou tl ay s	
  Permanent Full-tine Workyears.
  Total Workyears	
                                                    Actual
                                                     1981
    12.0
     3.0
     2.3
21,269.5
    54.6
    62.9
 2,500.0
 2,412.2
 2,254.8
    10.0
    24.1
74,742.9
40,283.1
 8,038.7
    67.3
    75.3
                                                  (9,000.0)
                                                  (9.000.0)
                                                  (9,000.0)
                January
               Estimate
                 1962
     25.0
     20.0
 30,000.0
     62.6
     71.6
  2,580.0
  2,580.0
  3,000.0
     11.0
     26.0
250,000.0
250,000.0
164,000.0
    635.0
    730.0
                  March
                Estimate
                  1982
                                                                                    25.0
                                                                                    20.0
                                                                                30,000.0
                                                                                    58.8
                                                                                    67.8
                                                                                 1,030.0
                                                                               200,000.0
                                                                               200,000.0
                                                                                84,000.0
                                                                                   503.0
                                                                                   584.0
                                                                                                Current
                                                                                               Estimate
                                                                                                 1982
     25.0
     20.0
 30,000.0
     58.8
     67.8
    613.0
190,000.0
190,000.0
117,743.0
    503.0
    584.0
                                            (26,600.0)
                                            (26,600.0)
                                            (26,600.0)
                Estimate
                  1983
     25.0
     20.0
 30,000.0
     58.8
     67.8
230,000.0
230,000.0
188,000.0
    516.4
    592.2
                                             (44,000.0)
                                             (44,000.0)
                                             {44,000.0)
$3,033,180.5
5,280,04^.7
5,249,240.4
10,509.1
12,837.5
$5,326,271.0
6,610,408.0
5,800,965.0
11,673.7
14,449.2
$1,391,447.0
2,526,585.0
5,224,272.0
10,387.0
12,860.5
$3,676,012.0
4,776,131.7
5,435,812.0
9,821.0
12,161.0
$3,591,392.0
3,654,070.2
4,645,061.0
8,645.0
10,481,0

-------
 ENVIROIMEMTAL PROTECTION AGENCY

Summary of Increases or Decreases
  Budget Authority and Horkyears
      (dollars In thousands)

Research and Development
Budge t AutlwH ty 	 	
Abatement, Control and Compliance
Budget AuthoH ty .................
Permanent Full-time Workyears....
Salaries and Expenses

Permanent Full-time Workyears....
Total Iforkyears 	 	 	
Buildings and Facilities

Scientific Activities Overseas

Reimbursements
Permanent Full-time Workyears....
Total korkvears 	 	 	
January
Estimate
1982

$229,355.0

492,072*0
16KB

645,618.0
10,965.1
13 459.8

6,646.0



62.6
71.6
Harch
Estimate
1982

$190,635.0

413,928.0


582,769.0
9,825.2
12 208.7

4,115.0



58.8
67.8
Current
Estimate
1982

$154,315.6

372,969.7
* * *

555,105.7
9,259.2
11 509.2

3,621.0



58.8
67.8
Estimate
1983

$108,703.8

311 575.0
* * *

538,113.2
8,069,8
9 821.0

3,000.0

.

58.8
67.8
Increase +
Decrease -

-$45 611.fi

-61,394.7
4 * •

-16,992.5
-1,189.4
-1 688.2

-621.0

.

...

-------
                                            January
                                            Estimate
                                              1982
 March
Estimate
 1982
Current
Estimate
 1982
Estimate
 1983
Increase +
Decrease -
U.S. Regulatory Council
  BudgetAuthority...".."..	         $2,580.0
  Permanent Full-time Workyears....             11.0
  Total Workyears	             26,0

Hazardous Substance Response
 trust "f unS
  BudgetAuthority	        250,000.0       200,000.0       190,000.0        230,000.0       +40,000.0
  Permanent Full-time Workyears....            635.0           503.0           503.0            516.4           +13.4
  Total Workyears.	            730.0           584.0           584.0            592.2            +8.2

Payment to Hazardous Substa nee
 Response Trust Fumf
 	Widest'	JbiThb'Fttai';"	              ...             ...       (26,600.0)       (44,000.0)     (+17,400.0)
  Obligations	              ...             ...       (26,600.0)       (44,000.0)     (+17,400.0)
  Outlays.	              ...             ...       (26,600.0)       (44,000.0)     (+17,400.0)

Subtotal
  Butfgel Authority	>	     $1,626,271.0    $1,391,447.0    $1,276,012.0     $1,191,392.0      -$84,620.0
  Permanent Full-time Workyears...,         11,673.7        10,387.0         9,821.0          8,645.0        -1,176.0
  Total Workyears.		         14,449.2        12,860.5        12,161.0         10,481.0        -1,680.0

Construction Grants
 • Budget Authiaf 1 ty	,      3,700,000.0             ...     2,400,000.0      2,400,000.0


Total. Environmental Protection
 Agency
 TOlget Authority	     $5,326,271,0    $1,391,447.0    $3.676,012.0     $3,591.392.0      -$84,620.0
  Permanent Full-time Morkyears....         11,673.7        10,387.0         9,821.0          8,645.0        -1,176.0
  Total Workyears.	         14,449.2        12,860.5        12,161.0         10,481.0        -1,680.0

-------
                                             ENVIRONMENTAL PROTECTION AGENCY
                                            Liquidation  of Contract Authority
                                                (In thousands  of dollars)
                                                             January        March          Current
                                               Actual         Estimate       Estimate       Estimate       Estimate
                                                1991             1902           1982           19S2           1983
Construction Grants...	...»	      $1,700,000.0     $1,000,000.0    $1,000,000.0   $1,000,000.0

-------
Page Intentionally Blank

-------
 Air
SECTION TAB

-------
Page Intentionally Blank

-------
                                    ACTUAL
                                     1981
                                                 AIR
              JANUARY
              ESTIMATE
                1982
                        MARCH     CURRENT   ESTIMATE INCREASE +
                       ESTIMATE   ESTIMATE    1983   DECREASE -
                         1982       1982            1983 ₯S 1982
APPROPRIATION
                                             (DOLLARS IN THOUSANDS)
 Salaries 8 Expenses
 Abatement Control <
 Compliance
 Research * Development

TOTAL, Air
 $76,233.9  $89,030.6  $82,682.4  $77,517.8  $67,171.9 -$10,345.9
$125,369.2. $126,821.4 $119,936.3 $112,193.0  $92,800.8 -$19,392.2

 $33,785.4  $39,368.9  $35,549.0  $30,051.1  $24,080.6  -$5,970.S

$235,388.5 $255,220.§ $238,167.7 $219,761.9 $184,053.3 -$35,708.6
PERMANENT FULL-TIME WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
   1,753.8    1,912.5    1,746.4    1,642.0    1,333.2     -308,8
   2,087.2    Z.286.2    2,037.2    1,927.4    1,549.4     -378.0
$247,040.7 $287,832.0 $266,257.0 $257,340.0 $218,492.5 -$38,847.5
$270,167.0
PROGRAM HIGHLIGHTS
Oxldants Non-Energy*
 Salaries 4 Expenses
 Research $ Development

Hazardous Air
Pollutants Non-Energy
 Salaries A Expenses
 Research J Development
$5,268.5   $5,770.8   $5,730.9   $5,240.6
$8,433.4  $12,705.4  $12,345.1   $9,961.0
                                              $4,581.0    -$659.6
                                              $6,877.8  -$3,083.2
  $4,799.6   $5,308.4   $5,884.0   $5,339.1   $4,941.7    -$397.4
  $5,099.4   $5,742.3   $4,884.0   $4,034.5   $3,052.7    -$981.8

-------
                                    ACTUAL
                                     1981
                                                 AIR
                    JANUARY
                    ESTIMATE
                      1982
              MARCH     CURRENT   ESTIMATE INCREASE +
             ESTIMATE   ESTIMATE    1983   DECREASE -
               1982       1982            1983 VS 1982
                                             (DOLLARS Id THOUSANDS)
Mobile Sources Non-
Energy
 Salaries S Expenses
 Research A Development

Gases and Particles
Non-Energy
 Salaries I Expenses
 Research S Development

 Salaries 4 Expenses
 Research 8 Development
RESEARCH t DEVELOPMENT

A1r Quality &
Stationary Source
Planning 4 Standards
 Salaries 4 Expenses
 Abatement Control 4
 Compliance

(•tabHe Source Air
Pollution Control i Fuel
Econonjy
 Salaries 4 Expenses
 Abatement Control 1
 Compliance
        $4,054,4   $3,825.8   $3,805.2   $3,031.8   $2,034.6
        $2,891.5   $2,483.4   $2,448.0   $2.563.8   $2.441.9
       $11,177.9  $14,231.4  $13.460.5  $12,069.1  $11,547.1
       $17,361,1  $18.437,8  $15,871.9  $13.491.8  $11,708.2
       $25,300.4
       $33,785.4
TOTAL  $59,085.8
$29,136.4  $28,880.6  $25,680.6  $23.104.4
$39,368.9  $35,549.0  $30.051.1  $24,080.6
$68,505.3  $64,429.6  $55,731.7  $47,185.0
        $9,512.3  $10,297.4   $9,817.4   $9.523.6   $8,007.8
       $17,199.8  $19,269.0  $15,362.0  $10,733.9  $11,781.6
       $10.309.6   $8,472.0  $10.839.1  $10,019.3   $8,980.7
        $4,367,6   $3,447.9   $3,358.9   $1,548.3   $3,038.3
                                              -$997.2
                                              -$121.9
  -$522.0
-$1,783.6

-$2.576.2
-$5.970.5
-$8,546.7
                                            -$1.515.8
                                             $1,047.7
                                            -$1.038.6
                                             $1,490.0

-------
                                    ACTUAL
                                     1981
                                                 AIR
                    JANUARY
                    ESTIMATE
                      1982
 MARCH     CURRENT   ESTIMATE INCREASE +
ESTIMATE   ESTIMATE    1983   DECREASE -
  1902       1982            1983 VS 1982
                                             (DOLLARS IN THOUSANDS)
State Programs
Resource Assistance
 Salaries * Expenses
 Abatement Control A
 Compliance

Air Quality Management
Implementation
 Salaries & Expenses
 Abatement Control S
 Compliance

Mobile Source
Preproduction Compliance
Verification
 Salaries & Expenses
 Abatement Control 4
 Compliance

Trends Monitoring S
Progress Assessment
 Salaries * Expenses
 Abatement Control 4
 Compliance

 Salaries 8 Expenses
 Abatement Control S
 Compl1ance
ABATEMENT * CONTROL
          $219.3     $381.8     $381,8     $223.5     $238,1      $14.6
       $91,057.3  $88,395,9  $88,395.9  $88,734.9  $70,578.7 -$18,156.2
        $9,526.1  $10,462.3   $9,184.3   $9,564.4   $8,791.5     $772.9
          $222.0   $2,242.9      $42.9     $116.5      $34.3      $82.2
                   $4,373.1
                     $631.4
        $3,924.4   $4,550.1   $4,529.9   $4,313.9   $4,425.3     $1-11.4
          $431.7     $510.5     $502.8     $312.6     $452,3     $139.7
       $33,491.7  $38,536.7  $34,752.5  $33,644.7  $30,443.4  -$3,201.3
      $113,278.4 $114,497.6 $107,662.5 $101,446.2  $85,885.2 -$15,561.0

TOTAL $146,770.1 $153,034.3 $142,415.0 $135,090.9 $116,328.6 -$18,762.3

-------
                                                 AIR
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE -
                                                1982       198Z        1982            1983 VS 1982
                                             (DOLLARS IN THOUSANDS)


Stationary Source
Enforcement
 Salaries ft Expenses             $13,038,8  $17,145.8  $15,358.7  $14,232.9   $10,101.5   -$4,131.4
 Abatement Control *              $9,845.0   $9,841,2   $9,791.2   $9,791.2   $5,019.1   -$4,772.1
 Compliance

Mobile Source
Enforcement
 Salaries ft Expenses              $4,403.0   $4,211.7   $3,690.6   $3,959.6   $3,522.6    -  $437.0
 Abatement Control I              $2,199.8   $2,482.6   $2,482.6     $955.6   $1,896.5      $940.9
 Compl1ance

 Salaries ft Expenses             $17,441,8  $21,357.5  $19,049.3  $18,192.5   $13,624.1  -$4,568,4
 Abatement Control &             $12,044,8  $12,323.8  $12,273.8  $10,746.8   $6,915.6  -$3,831.2
 Cotnpl lance
EMFORCEMEHT               TOTAL  $29,486.6  $33,681.3  $31,323.1  $28,939.3   $20,539.7  -$8,399.6

TOTAL PERMANENT MORKYEARS
Oxldants Non-Energy
Hazardous Air
83.3
91.9
74.1
77.9
74.1
92.9
67.7
90.6
59.9
77.3
-7.8
-13.3
Pollutants Non-Energy

Mobile Sources Non-                   56.2       34.7        34.7        31.3        21.9       -9.4
Energy

-------
AIR

Gases And Particles
Non-Energy
RESEARCH I DEVELOPMENT TOTAL
Air Quality «
Stationary Source
Planning 8 Standards
Mobile Source Air
Pollution Control S
Fuel Economy
State Programs
Resource Assistance
Air Quality Management
Implementation
Mobile Source
Preproduetlon Compliance
Verification
Trenrts Monitoring 4
Progress Assessment
ABATEMENT « CONTROL TOTAL
Stationary Source
Enforcement
Mobile Source
Enforcement
ENFORCEMENT TOTAL
ACTUAL
1981
182.2
413.6
241.2
208,5
4.3
277.4

108.3
839.7
392.7
107.8
500.5
JANUARY
ESTIMATE
1982
194.6
381.3
250.5
152.3
6.0
311.0
87.0
116.3
923.1
497.5
110.6
608,1
MARCH
ESTIMATE
1982
179.6
381.3
236.1
178.4
6.0
275,0

116.3
811.8
456.3
97.0
553.3
CURRENT
ESTIMATE
1982
174.9
364.5
231.1
172.4
4.0
261.4

112.4
781.3
409.2
87.0
496.2
ESTIMATE
1983
149.5
308.6
191.9
140.4
4.0
246.5

112.0
694.8
273,4
56.4
329.8
INCREASE ^
DECREASE •
1983 VS 19(
-25.4
-55.9
-39.2
-32.0

-14.9

-.4
-86.5
-135.8
-30.6
-166,4

-------
                                                 AIR

TOTAL HORKYEARS
Oxidants Non-Energy
Hazardous Air
Pollutants Non-Energy
Mobile Sources Non-
Energy
Gases And Particles
Non-Energy
RESEARCH $ DEVELOPMENT TOTAL
Air Quality &
ACTUAL
1981
108,7
111.4
74.*
210.4
505.1
263.2
JANUARY
ESTIMATE
1982
106.5
101.5
52.8
233.8
494.6
273.4
MARCH
ESTIMATE
1982
106.5
116.5
52.8
218.8
494.6
257.4
CURRENT ESTIMATE INCREASE 1
ESTIMATE 1983 DECREASE •
1982 1983 VS 19£
98.5
113.3
49.0
217.3
478.1
252.4
84.5
93.3
35.7
187.1
400.6
206.3
-14.0
-20.0
-13.3
-30.2
-77.5
-46.1
Stationary Source
Planning & Standards

Mobile Source A1r
Pollution Control ft
Fuet Economy

State Programs
Resource Assistance

Air Quality Management
Implementation

Mobile Source
Preproduction Compliance
VeHH cation
272.7
 33.5
189.7
 72.7
235.6
  8.0
227.6
  6.0
185.5
-42.1
  4.0      -2.0
308.3      337.8      298.8      284.6      266.8     -17.8
           110.0

-------
AIR

Trends Monitoring 1
Progress Assessment
ABATEMENT * CONTROL
Stationary Source
Enforcement
Mobile Source
Enforcement
ENFORCEMENT
ACTUAL
1981
121.0

TOTAL 998.7
435.2

148.2

TOTAL 583.4
JANUARY
ESTIMATE
1982
128,0

1,111.6
536.8

143.2

680.0
MARCH
ESTIMATE
1982
128.0

927,8
487.1

127.7

614.8
CURRENT
ESTIMATE
1982
123.7

894.3
437.3

117.7

555.0
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
121.8

784.4
289.6

74.8

364.4
-1,9

-109.9
-147.7

-42.9

-190.6

-------
                                     AIR


OVERVIEW AMDSTRATEGY

     The Clean Air Act  authorizes  a national  program of air  pollution  research,
regulation, and enforcement  activities.   Under the  Act,  primary  responsibility
for the prevention and  control  of  air pollution  at  its source rests with  State
and local   government,  with  a  mandate that the  Environmental Protection Agency
(EPA) take  action  where  States do  not  fulfill  their  responsibilities.   EPA's
role is to conduct research  and development programs, ensure  that  adequate  stan-
dards and  regulations  are established  to meet  environmental  goals  set by  the
Act, support and promote  State and local  assumption of environmental  responsi-
bilities and control  activities,  and ensure  that the standards and  regulations
are effectively met.  The environmental  goals are generally those  prescribed  by
National Ambient Air Quality Standards (NAAQS).  Two types of  standards  are set:
primary standards to  protect human health, and  secondary  standards to  protect
the public welfare (prevention  of damage to property, animals, vegetation,  crop,
visibility, etc.).   The health  and other effects  of  pollutants are delineated  in
criteria documents which  are the basis  for the  standards.  There  presently  are
National Ambient Air Quality Standards  for total  suspended participates, sulfur
dioxide, nitrogen dioxide, carbon monoxide, ozone, and lead.

     Specific limitations  on pollutant  emissions necessary  to  meet  NAAQS are
prescribed in State  Implementation  Plans (SIP).  These controls are supplemented
by federally prescribed national emission  standards  for selected  new stationary
sources (called new  source performance  standards) and new mobile  sources of  air
pollution.

     Air program activities  have  been directed primarily  at  the  attainment  and
maintenance of  NAAQS.   The  combined  Federal-State-local   effort  at controlling
air pollution has achieved  a noticeable degree  of success in improving  ambient
air quality across  the Nation,  with some areas  attaining all  standards  while
allowing economic growth.    The Clean Air Act, as amended  in 1977,  recognizes
the fact  that  not  all  standards  have been met in  all  areas and  sets forth  a
comprehensive program for achieving the  standards.   In  general, the Act  requires
that the  standards  be  attained by  the  end of  calendar year 1982.  However,  in
recognition of the  unusual problems some  areas  have in attaining  the  standards
for ozone and carbon monoxide,  attainment  of  these standards  is to be as exped-
itious as possible,  but in no case later than  1987.

     The Agency's highest air  program priority 1n 1983 will  continue to be the
improvement of State  Implementation Plans  to  ensure an adequate regulatory base
for attaining and maintaining the  NAAQS.   Extensions of the  ambient air  quality
standard attainment dates for ozone or  carbon monoxide  beyond 1982  were  granted
to 29 States.  For these 29 States the law requires submittal  of a  state plan  in
1982 which will demonstrate  attainment  of  standards.   Fiscal  year  1982 will  see
Intensified efforts  by  State and  local  control  agencies,  with  assistance from
EPA, to adopt  additional measures for  control  of  hydrocarbon  emissions  from
both stationary and  mobile  sources and to  accelerate their Implementation  in
1983.

     The 1977 amendments to  the Clean Air  Act require EPA to review and  revise,
if necessary, the  NAAQS on  a  5-year schedule.  A  revised  ozone standard was
promulgated In 1979.  A revised carbon monoxide (CO) standard 1s scheduled  to  be
promulgated in 1982.   Revisions to  the  participate matter  standard are  to  be
proposed In 1982 with promulgation in 1983. Revised  standards for  sulfur dioxide
(502) and  nitrogen   dioxide  (NOz)   are  expected  to  be  proposed  1n  1983.  The
necessary credible  scientific  information  on  health and  other  effects for the
review and  revision  of NAAQS,  is  provided by EPA's  research program.   Work  in
1983 is focused  on  the standards  reviews  required  by  the Act.   Also,  in  order
to help determine  the  scope of  the inhalable  particulate  problem, monitoring
methods for measuring Inhalable particles  in  ambient air  and  at sources will  be
improved.
                                       A-8

-------
     While substantial progress has been made, completion  of  new source perform-
ance standards  (NSPS)  for  all  major stationary sources as  required  by  the Clean
Air Act Amendments  will  not be completed  by  the 1982 date mandated  by  the Act.
Consequently, the  1983  program to  produce  NSPS for  major  stationary  source
categories will  be increased  over 1982 levels  in an  effort to accelerate  the
completion of these standards.

     The mobile  source air  pollution  control program  will emphasize  continued
simplification of  motor  vehicle  preproduction and  presale  requirements.   This
will reduce unnecessary and redundant automobile manufacturers' paperwork, report-
ing and testing  burdens,  while maintaining environmental  protection.  Increased
emphasis will  be placed  on  compliance  of  in-use vehicles.  Programs to  control
fuel switching and  tampering will  continue and  the  States are  being encouraged
to develop their own enforcement programs for these two problems.

     Assessments of human exposure  to motor vehicle pollutants in actual  community
situations will  be  the highest priority of the  mobile source  research  program.
This program  provides  EPA'with a  scientifically defensible  data  base on  motor
vehicle emissions to support and evaluate mobile source standard setting  processes
and abatement strategies.  In 1983, research  on the health  risks associated with
diesel  emissions will focus on assessing human exposure.

     In addition  to  the  NAAQS,  nationally applicable  emission levels are  pre-
scribed for other pollutants  deemed  especially hazardous,  and apply  to  both  new
and existing  pollutant  sources.  National  Emission  Standards for Hazardous  Air
Pollutants (NESHAP) have  been established  for  asbestos,  beryllium,  mercury  and
vinyl chloride  from  a variety  of  sources.   Benzene,  arsenic  and  radionuclides
have been listed  as  hazardous air pollutants,  and emission  control  regulations
are under development with  promulgations  for  benzene  sources and  coke  ovens
expected in 1982 and 1983.

     Additional chemical  compounds  are  under  review for decisions on whether or
not they should  be listed  as hazardous air  pollutants.   Research on  hazardous
air pollutants  will  provide  the   scientific  support  for  the  Identiflcation
evaluation,  regulation and control of  airborne  substances having  carcinogenic,
mutagenic or other chronic, toxic health effects.

     National  and  international  concern continues  to be expressed about  the
problems potentially  associated  with add  deposition.   Research  1n  support  of
this effort  1s covered  in the  multi-media  Energy  Program and is  designed  to
develop the  necessary data  bases  in  order  to  fully understand  the  sources,
characteristics, trends,  and potential   damages   of  acid  deposition  before  any
regulatory actions  are  taken.   The  1983  proposed program,  based  on  current
authorities, will Initiate a significant monitoring effort.

     Many of  the major activities  highlighted in the  preceding  discussion of the
thrust of the 1983 program require field work on  the part  of  both the States and
EPA Regional offices.  The SIP revision and implementation  process,  the beginning
of analyses necessary in anticipation  of revised ambient  air quality standards,
the carrying  out of  Initiatives   related  to   regulatory  reform and  new  source
review all  Impose significant workload requirements upon both  States and Regions.

     The 1983 abatement  and  control and enforcement programs  continue to  reflect
full partnership  with the  States  in air  pollution  control.   States have  been
assisted 1n assuming  their responsibility under the Act  by  EPA's provision  of
both financial  and  technical  support.   Such  assistance will  be continued at  a
reduced level in  1983  reflecting  regulatory  reform and broader  State discretion
on regulatory  programs.  This assistance will  emphasized  improving  State  capa-
bilities with a corresponding reduction of  detailed Federal overview.

     The stationary  source enforcement  program will  shift emphasis to  focus  on
major sources  (those  with  an emissions potential with  controls of 250  tons  per
year or more)  in  nonattainment areas;  and  from Judicial enforcement, to  adnrini-
                                      A-9

-------
strati ve enforcement mechanisms.  The assumption of Increased enforcement respon-
sibility by States and local  governments  will  be of high priority, and technical
support for State enforcement programs will be provided by EPA.

     EPA's research  program also contributes  to Information  required by  State
and local control programs and by the Regional  offices In assisting these control
programs.  Environmental processes and effects research produces technical infor-
mation on the environmental effects of ozone and nitrogen oxides and provides the
urban and  regional  air  quality  models needed  by states  to develop,  adopt and
enforce cost-effective  control   strategies  for  these  pollutants.   Controls  for
volatile organic  compounds (VOC) will  be  evaluated  in the  engineering  program
for their applicability to small. Industrial sources.  Urban and regional  disper-
sion models for  sulfur oxides  and  particles are  being improved  and  refined to
help States choose optimum control strategies.  This effort will Include develop-
ment of source apportionment  analyses  which will permit more precise Identifica-
tion of sources contributing to  specific ambient air quality problems.
                                      A-10

-------
j                                                  AIR


                SUMMARY OF INCREASES AMD DECREASES
                                                                         (in  thousands of dollars)
                     1982 A-fr Program	            $219,761.9

                        Salaries and Expenses	             -10,345.9

                        The net decrease reflects the personnel  reduc-
                        tion related to the formation of the new Office
                        of Legal and Enforcement Counsel in the  Inter-
                        disciplinary program, improved focus of enforce-
                        ment efforts,  state of completion of implementa-
                        tion plans,  as well as consolidation of  mobile
                        source control activities.

                        Research and Development	              -5,970.5

                        The net decrease reflects the completion of some
                        diesel  health studies in 1982, and improved sche-
                        duling of research activities necessary for the
                        review of ambient  air quality standards.

                        Abatement, Control  and Compliance..........	             -19,392.2

                        The net reduction  reflects  reduced need for extra-
                        mural  support for  enforcement as the Agency refines
                        its focus on major violators, as well as a  reduc-
                        tion in the  Section 105 Grants.

                     1983 Air Program	            $184,053.3


                SUMMARY OF CHAMGES TO JANUARY 1982  BUDGET ESTIMATE

                                                                         (1n thousands..of dollars)

                     January 1982 Estimate	            3255,220.9

                        January-March	             -16,097.7

                        Reorganization	                -955.5

                        Reprogrammings	.	                +400.2

                        Congressional  Actions.......	             -18,758.9

                        A decrease of  $8,478,000 to Abatement, Control
                        and Compliance and  a decrease  of  $3,530,300
                        to Research  and Development were taken against
                        the March estimate to reflect the September 12%
                        reduction.  A Congressional  add-on of $500,000
                        for academic  training  grants was applied  to
                        the Abatement, Control  and  Compliance.   An
                        additional reduction of $9,286,500  was  app-
                        lied to the  Salaries and Expenses ($7,475,000),
                        Research and Development ($203,500), and Abate-
                        ment,  Control  and  Compliance (51,608,000) ap-
                        propriations to meet Congressional 1y mandated
                        appropriation levels.  Congress also restored
                                                     A-11

-------
                                                   (fn thousands of dollars)

   $2,035,900 to  the Abatement,  Control  and  Comp-
   liance appropriation for Stationary Source
   Enforcement.

   Transfer Authority	,	                -47.1

   A net  decrease of $47,100  was transferred  from
   this program  as  follows:  $227,600  was  trans-
   ferred from  Abatement,  Control  and  Compliance;
   $1,764,100 was transferred from Research and
   Development; and  $1,944,600 was  transferred  to
   Salaries and Expenses.

Current 1982 Estimate	           $219,761.9
                                A-12

-------
                                              AIR
                                           Budget       Current                 Increase +
                               Actual      Estimate    Estimate     Estimate    Decrease -
Program Activities              1981       _1982        1982          1983      1983 jrs. 1981

Number of pollutants
 covered by hazardous
 pollutants standards...          4856             +1
Number of automobile
 engine families awarded
 certificates for con-
 formity with emission
 standards	        216          250          250          250
Number of source categories
 covered by New Source
 Performance Standards..         37           61            51           66            +15
Number of emission tests
 carried out for motor
 vehicles certification
 purposes	       590          150          300          300
Number of fuel economy
 tests carried out	       275        1.300          700          700
Assembly line testing
 test orders	        27           28           25           17             ~8
Combined fuels/vapor
 recovery Inspections...     25,000       25,000      14,000       25,000        +11,000
Recall Investigations..          35           35           45           35            -10
Number of administrative
 orders initiated by EPA.        65          207           65          190           +125
Numbers of compliance
 monitoring Inspections
 conducted by EPA.	     3,475        2,300     .   1.825        1,835            +10
Assistance provided in
 State Compliance
 Activities	        —           28           55          110            +55
Number of technical work-
 shops developed..	         3335             +2
Number of Enforcement Work-
 shops presented to State
 and local agencies	        23           20           30           40            +10
Number of Technical
 Manuals Developed	••         64           4            4
Number of Continuous
 Compliance Pilot
 Programs...	         •»-           —           2            3             +1
                                           A-13

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                 AIR

                                         Oxldants Non-Energy
                                     ACTUAL
                                      1981
             JANUARY
             ESTIMATE
              1982
            MARCH
           ESTIMATE
            1982
           CURRENT   ESTIMATE INCREASE +
           ESTIMATE    1983   DECREASE -
            1982            1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Scientific Assessment
 Salaries A Expenses
 Research & Development

Technical Information
t Liaison
 Salaries 8 Expenses
 Research 4 Development

Monitoring Systems A
'Quality Assurance
 Salaries 4 Expenses
 Research A Development

Health Effects
 Salaries S Expenses
 Research 4 Development

Environmental Engineering
8 Technology
 Salaries 4 Expenses
 Research 4 Development
  $247.9
   $99.9
  $253.0
    $6.9
$182.6
$114.6
$199.6
  $6.8
$181.6
$114.6
$199.6
  $6.8
  $882.7   $1,206.1   $1,197.0
  $639.2     $436.2     $427.5
$1,588.2   $1,735.8   $1,726.0
$2,964.3   $4,955.4   $4,816.4
  $552.2     $661.8     $653.0
  $674.1   $1,748.2   $1,680.6
$181.6     $425.8    $244.2
$114.6     $300.8    $186.2
$169.3     $185.5     $16.2
                      $978.9     $693.9   -$285.0
                      $364.2     $390.1     $25.9
                    $1,410.2   $1,138.7   -$271.5
                    $3,804.8   $1,952.2 -$1,852.6
                      $603.8     $761.7    $157.9
                      $581.0   $1,602.7  $1,021.7

-------
                                                 AIR

                                         Oxldants Non-Energy

                                     ACTUAL    JANUARY     MARCH
                                      1981     ESTIMATE   ESTIMATE
                                                1982       1982
                                   CURRENT   ESTIMATE INCREASE +
                                   ESTIMATE    1983   DECREASE -
                                    1982            1983 VS 1982
TOTAL;

Environmental
Processes « Effects
 Salaries 8 Expenses
 Research A Development

TOTAL:
 Salaries & Expenses
 Research « Development
                                             (DOLLARS IN THOUSANDS)
$1,744,5   $1.784.9   $1,773.7   $1,896.8   $1,375.4   -$521.4
$4,049,0   $5,444,2   $5,299.2   $5,096.4   $2,632.0 -$2,464.4
 $5,268.5   $5,770.8   $5,730.9   $5,240.6   $4,581.0   -$659.6
 $8,433.4  $12,705.4  $12,345.1   $9,961.0   $6,877.8 -$3,083.2
 Oxldants Non-Energy    TOTAL     $13,701.9  $18,476.2  $18,076.0  $15,201.6  $11,458.8 -$3,742.8
PERMANENT FULL-TIME WORKYEARS
Scientific Assessment
Technical Information
A Liaison
Monitoring Systems &
Quality Assurance
Health Effects
3.4
3.4
14.9
25.0
3.7
3.1
15.4
18.4
3.7
3.1
15.4
18.4
3.0
3.1
15.4
15.7
5.5
1.9
10.3
16.6
2.5
-1.2
-5.1
.9

-------
& Technology

Environmental
Processes 4 Effects

TOTAL HORKYEARS
                                                 AIR

                                         Oxldants Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Environmental Engineering
4 Technology
Environmental
Processes & Effects
TOTAL PERMANENT HORKYEARS
TOTAL HORKYEARS
Scientific Assessment
Technical Information
1 Liaison
Monitoring Systems 4
Quality Assurance
Health Effects
Environmental Engineering
8.3
28.3
83.3

5.9
4.2
18.7
28.8
13.2
10.6
22.9
74.1

5.9
4.9
22.0
21.2
18.4
10.6
22.9
74.1

5.9
4.9
22.0
21.2
18.4
9.6
20.9
67.7

5.2
4.9
22.0
17.9
17.4
6,7
18.9
59.9

8.0
3.6
14.8
17,6
14.4
-2.9
-2.0
-7.8

2.8
-1.3
-7.2
-.3
-3.0
 37.9
108.7
 34.1
106.5
 34.1
106.5
31.1


98.5
26.1


84.5
 -5.0


-14.0

-------
                                   AIR

                           Oxidants Non-Energy
Budget Request
     The Agency  requests  a  total  of  $11,458,800  and  59.9 permanent  workyears
for 1983,  a  decrease  of  $3,742,800  and  7.8  permanent  workyears  from  1982.
Included in this  total  is $4,581.000  for Salaries  and Expenses  and  $6,877,800
for Research  and  Development,   with   a   decrease  of  $659,600  and  $3,083,200,
respectively.   This net decrease results from  a  reduction  due  to an  effort to
more efficiently  schedule  the  work   needed  to   produce  the  scientific  data
required for  future updates  of  the  criteria  documents,   and  an  increase  in
control technology  work  due  to  a  consolidation  of  work  from  the  Gases  and
Particles, and Hazardous  Air Pollutants budget sub-activities.

Program Description

     The overall program  provides scientific data  on  the health and environmental
effects, including  ecological  effects and  material   damage,  and  on  monitoring
techniques for ozone (03)  nitrogen dioxide (NOg) and  other photochemical  products
to comply with  Sections  108  and  109  of  the  Clean Air  Act,  The Clean  Air Act
requires that the  criteria and  standards  be reviewed and,  if  necessary,  revised
every five years;  therefore,  continually updated  information  on  health  effects
and ecological  processes  is   needed to support maintenance or  revision  of the
criteria and standards.

     As part of the projects  which obtain such information,  this program provides
the regulatory program with  techniques for the assessment  of the transport and
transformation processes  involving ozone  and nitrogen dioxide and their precur-
sors, volatile  organic  compounds and nitric  oxide.   Various  types  of  models,
Including but not  necessarily limited to  air quality simulation models  needed by
States for State  Implementation  Plans  (SIP's),  are developed to apply  on local,
urban and regional scales.  Appropriate field studies to obtain technical  results
needed to Implement such  models accompany the model  development work.

     Further,  as  part  of  this program,  assessments  are made  through  laboratory
and field studies  of transport and transformation processes  by which photochemi-
cally generated  products  other than  ozone  and  nitrogen  dioxide  are  formed and
eventually removed  from  the  atmosphere  into   other media.   This program  also
supports the  evaluation  and  assessment   of  the  pollution   control  technologies
capable of  reducing or  eliminating  volatile  organic  compounds   emissions  from
industrial sources.  This  research   is   designed  to   support  State  and  local
agencies In developing  and  evaluating  cost-effective  abatement   strategies  for
photochemical  oxidant pollution.

SCIENTIFIC ASSESSMENT

1981 Accompli shments

     In 1981,  the Agency  used a total of  $347,800  for  this  program,  of which
$247,900 was  under the  Salaries and  Expenses appropriation and $99,900  was for
extramural purposes under the Research and Development appropriation.

     Technical consultation  on  the  effects  of  NOX  exposure was  provided  to
the Agency's  Office of Air   Quality  Planning  and  Standards  (OAQPS)  for  their
development of  a  regulatory  options  paper  for  revising  the  NOX  ambient air
standards.  The necessary Clean Air Scientific Advisory Committee (CASAC)
review of  the  NOX  criteria  document  and  other  regulatory  milestones  were
achieved.  In late 1931,  initial planning  and baseline  contracts  were  awarded
to initiate  the  planning for  the  next  update   of the  photochemical  oxidant
criteria document.
                                      A-17

-------
1982 Explanation of Changes from January Budget Estimate

                   January        March        Current
                   Estimate      Estimate     Estimate

                   $297,200      $296,200     $296,200

     The net decrease of ^$1,000 results from the following action:

                 - March.   (-$1,0001    This   change  represented  a  decrease  of
     $1 ,000 from the January budget for Salaries and Expenses.

1982 Program

     In 1982,  the  Agency  is  allocating a  total  of  $296,200 and 3.0  permanent
workyears to this program,  of which $181,600 is under the  Salaries  and Expenses
appropriation and $114,600 is  for extramural  purposes  under  the Research  and
Development appropriation.

     The Agency's second  criteria  document for nitrogen oxides  will  be released
for OAQPS use  in reviewing the existing  nitrogen  oxide ambient air standard.  At
the request of the regulatory  office  the scientific assessment program Initiated
the 20-24 month process  of preparing  the updated  photochemical  oxldants document
which is then used as the  scientific  basis  for  revising  the air quality standard
per the requirements of the Clean Air Act.

1983 Program Request

     The Agency requests a total  of $726,600 and 5.5 permanent workyears for this
program, of  which  $425,800  is  for  Salaries and  Expenses  and  3300,800 is  for
Research and Development.   This  reflects  an increase of  $244,200 and $186,200
respectively, which supports the need to apply  increased resources to the inten-
sive final  stages  of  the  ozone  (photochemical  oxldants)  criteria  document
devel opment.

     By October 1982, 1t Is expected that the ozone criteria  document will  be on
schedule and be  about half  completed in  terms of the  total time necessary to
develop and/or revise  it.  The  first draft of a document for  external  review,
including the  CASAC, should be  available in 1983.  A final  criteria  document is
expected to  be completed  by  early  1984, thus enabling the regulatory  office to
meet the required five-year schedule  for the review  and revision  of  the oxidant
ambient air standard.

     Initial planning and  groundwork  contracts will  be awarded  which will  be
required for the next  review of the  air criteria document  for  nitrogen  oxides.
This is in accordance with the periodic five-year update  schedule.

TECHNICAL INFORMATION AND LIAISON

     The Technical  Information and Liaison  function is performed 1n the majority
of the research and  development  budget sub-activities.   It  supports  many  of the
same type of activities  In each  area.  Therefore,  a  description of these common
activities will not  be repeated each time, but  will be  described here  in the
Oxldants Non-Energy  budget sub-activity and  referenced  in each  succeeding one.
Accomplishments and  proposed  activities  specific  to each  sub-activity will  be
identified 1n the appropriate description.

     The Technical   Information  and Liaison  program supports   those  activities
which enable the  Office  of Research  and Development (ORD)  to  communicate its
research results and to  offer technical  assistance to  State and local authori-
ties and to  other environmental  decision-making officials.  The program consists
of two  major  types  of  activities.   The  first,  performed  by  the  Center  for
Environmental Research  Information  (CERI)  In  Cincinnati,   1s  the  development
                                       A-18

-------
and dissemination  of  technical   information products.   These  include  program
and project  summaries,  decision series  documents,  technology transfer  publica-
tions, the Research[Outlook, and Research Highlights.

     The second major type  of  activity supported by this program is  the liaison
work performed by  the Regional  Services Staff  (RSS).   RSS plans, coordinates,
and reviews a  comprehensive program which provides for  effective communications
between ORD, the ten  Regions,  and  the Office of  Intergovernmental Liaison.   RSS
furnishes information to ORD  on all  aspects of Regional operations,  acts as a
consultant to  the  Regions  to  help  define  and resolve their  technical  problems,
and helps provide direct technical  assistance to  State and  local  decision-makers
In accordance  with  PL.  96-480.   This  staff's  activities  insure  that  EPA's
Regional offices have ready access  to ORD's research and development  capability
and results.

     The Technical  Information  and  Liaison  program  insures that ORD's  research
results are readily available in a usable form and are effectively communicated to
the program offices, to State and local officials, and to other Interested parties.

1981 Accompl1shments

     In 1981,  the  Agency  used a  total  of  JZ59.900 for this  program, of  which
$253,000 was under the  Salaries and  Expenses appropriation and  $6,900 was  for
extramural  purposes under the Research and  Development appropriation.

     Technical  Information  support is reflected in the production of  the following
products:

     -  Response Report:   Oxidant Transport Study -  San Jose,  California

     -  Problem Oriented  Report:  Technical  Assistance  Document for
        Non-Methane Organic Carbons  (NMOC)

     -  Project Report:   New  Approaches to Quantitating the Pulmonary  Effects
        of Inhaled  Pollutants

     -  Journal Article:   Biochemical  Effects   of  Inhalation  of NOg  by  Human
        Subjects at Rest

1982 Explanation of Changes from January Budget Estimate

                   January        March       Current
                   Estimate      Estimate     Estimate

                   $206,400      $206,400     $169,300

     The net decrease  of  -$37,100  results  from  several  actions, as  follows:

     ~  ReprogranBiing.  (-$800)  This Agency-wide reprogramming provided resources
     for transferof  the  accountability function to the  Office  of  Management
     Systems and Evaluation and, in addition, provided additional  resources  for
     the Immediate  Office  of the Assistant Administrator  for  Solid  Waste  and
     Emergency  Response.   (This reprogramming was included In a letter  to Congress
     on December 16,  1981).

     -  Congressional  Actions.   (-$36,300)   An additional  reduction of  -$36,300
     was applied to the Salaries and Expenses appropriation to meet Congression-
     al ly mandated  appropriation levels.

     -  Transfer Authority.   (No Change)  The net change  applied  to this  activity
     is made up of a decrease of -$6,800  from  Research and Development and an
     Increase of +$6,800  to Salaries and Expenses for essential operating costs.
                                      A-19

-------
1982 Program

     In 1982,  the  Agency  1s  allocating a  total  of  $169,300  and  3.1  permanent
workyears to  this  program,  all   of  which  1s  under  the  Salaries and  Expenses
appropriation.

     Specific products will be developed Including:

     -  Project Report:  National Forest Ozone Study

     -  Conference Proceedings:  Measurements and Reactivities of Natural
        Hydrocarbons

     -  Project  Report:  Ozone Effects  on  Subjects  with  Thermal and  Exercise
        Stress; and  Pulmonary Function in  Healthy  Young  Men  Exposed to  N02 ,

1983 Program Request

      The Agency requests  a total of  $185,500 and  1.9 permanent workyears  for
this program,  all  of  which  is   for  Salaries  and Expenses.   This reflects  an
increase of  $16,200,   which  results  from  a  decision  to  increase the  support
to the State's in assuming delegation.

     In 1983, the Technical Information and Liaison program will stress providing
the necessary technical  information  to State  and  local  officials 1n  support  of
their Increased role 1n administering environmental programs.

MONITORING SYSTEMS AND QUALITY ASSURANCE

1981 Accomplishments

     In 1981, the Agency  used a  total   of  $1,521,900  for this program,  of  which
$882,700 was under the Salaries  and  Expenses  appropriation  and  $639,200 was for
extramural purposes under the Research and Development appropriation.

     Monitoring support was provided to OAQPS to help  improve  the usefulness  of
air models and determine the effects of regional  pollutant transport,  as well  as
to provide data for standards revision.

     Quality assurance Involving  the verification,  calibration  and audits of air
pollution measurements was continued to ensure the accuracy of oxidant standards.
A repository was maintained of  standard  gas samples for  use in the  calibration
of instruments  with emphasis  upon  measurement of  ozone,  nitrogen  oxides  and
hydrocarbons.

     Since only  laboratory standards  are  currently  available  for use  in  ozone
measurement, a standard utraviolet spectrophotometer was developed by the National
Bureau of Standards under support from the Agency.  This will be used as a refer-
ence standard  in the   field for  ozone measurements  and will enhance  the States
and Agency's ability to measure ozone.

     The National A1r Pollution Background Network  continued  operating in National
Forests.  This  network obtains background  pollution  level  data  in areas remote
from industrial /municipal emissions to  provide  a base for comparison and for trends
analysis.
                                      A-20

-------
 1982Explanationof Changes from January Budget Estimate

                    January        March        Current
                    Estimate      Estimate     Estimate

                  $1,642,300    $1,624,500   $1,343,100

      The net decrease  of  -$299,200  results  from  several  actions,  as  follows:

      -  January - March.   (-$17,800)   This  change  represented  a  decrease   of
      Sl/.BUO from  the  January  budget,  of  which  $9,100  was  for  Salaries  and
      Expenses and  $8,700  was  for  Research   and   Development.    This   decrease
      resulted in fewer  quality  assurance audits of ozone monitoring equipment.

      -  Congressional  Actions.  (-$281,400)   A reduction  of  -$3,300  was  taken
      against the March  estimate reflecting the September  12* reduction to  the
      Research and Development appropriation affecting the  scope of an effort  to
      provide monitoring data and  support.   An additional  reduction of -$278,100
      was applied to the Salaries and Expenses ($248,100)  and Research and  Develop-
      ment ($30,000) appropriations to meet Congressionally mandated appropriation
      levels.

      -  Transfer Authority.  (No Change)   The  net change applied  to this  activity
      is made up of a decrease -$30,000 from Research and Development and an  in-
      crease of $30,000 to  Salaries and Expenses for essential operating  costs.


 1982 Program

      In 1982, the Agency  is  allocating a total of $1,343,100  and  15.4 permanent
 workyears to this program, of which  $978,900  is under the Salaries and  Expenses
 appropriation and  $364,200 1s  for extramural  purposes  under the  Research and
 Development appropriation.

      Work in 1982 focuses  on the development of a low cost, portable monitor  for
 volatile organic compounds (VOCs).   Since  present  monitoring devices  are  too
 expensive to be widely  used  by  local  authorities,  the successful  development  of
 a low  cost,  portable  device  or method  will  be of Immense  value in assisting
 States' enforcement of VOC regulations already in place.

      The quality assurance program, working through The National Standards  Labo-
 ratory, provides audit  measurements  and maintains  a  repository  of standard  gas
 samples.  These standard  gas samples  will be  distributed  to various laboratories
 for use in calibration  of Instruments.   In  the oxidant  program,  this emphasis  is
 on ozone, nitrogen  oxides and hydrocarbons.

      This program  continues   the   monitoring   system for  measuring  background
 levels of  ozone,  through  operation  of the  National  A1r Pollution Background
 Network in National Forests.  This background  network  provides  data  for  remote
 areas, far from Industrial/municipal  sources  of emissions and thus will  provide
 a basis of comparison  as well  as for trends  analysis.

 1983 Program Request

      The Agency requests a total  of  $1,064,000 and 10.3 permanent workyears  for
 this program, of which $693,900 1s for Salaries and  Expenses and $390,100 Is  for
 Research and Development.  This reflects a  decrease  of  $285,000 and an  increase
 of $25,900, respectively.  This net  decrease  results  from a slight reduction  in
 effort on monitoring support and audits while  maintaining  the  emphasis on  devel-
 oping portable monitors.

      Overhead monitoring support,  will continue to  be provided to OAQPS so that
 the usefulness of air  transport models will  continue to improve.  Additionally,
 this supprt will help OAQPS  determine the effects'Of ambient air quality  stan-
dards by helping  to  provide the highest quality measurement methods available.
                                        A-21

-------
     The continuing operation  of the National Standards Laboratory  will  provide
audit measurements  and  maintain  a  repository  of standard  gas  samples.   These
standard gas  samples  will  be distributed  to  various  laboratories  for use  In
calibration of  Instruments.   The emphasis  in  the oxidant  program is  on  ozone,
nitrogen oxides and hydrocarbons.

     Efforts will continue  to  focus on the  development  of a low  cost, portable
monitor for volatile organic compounds, for which regulations are being developed.
The successful  development  of a  low  cost, portable device  or  method  1s  needed
since existing  instrumentation  for VOC measurements  are expensive and, in  some
cases, hazardous.   State  and  Agency officials have expressed a strong  need  for
this type  of  Instrument  for  use  by local  agencies  and  EPA   field  operations.

HEALTH EFFECTS

1981 Accocnpl i shments

     In 1981,  the Agency  used  a total  of  $4,552,500  for this  program,  of  which
$1,588,200 was  under the  Salaries and Expenses appropriation and $2,964,300  was
for extramural purposes under the Research and Development appropriation.

     In support  of  the  revaluation process for  updating  the criteria documents
for 03  and NOg,  the health  research  program provides   scientific  Information
designed to reduce  the  uncertainties  1n  estimates  of  the public health  risks
posed by photochemical  oxidants.  Thus an  Improved understanding  of  the signifi-
cance of  the   various   Indicators  of  biological   response  1s  sought  with  the
greatest emphasis  on  biochemical  Indicators  and  Immune  defense  mechanisms.

     Much of  the research  1s  designed  to  develop  dose-response  relationships
for inhalation  of photochemical  oxidants  (03, N02, PAN, aldehydes)  by sensitive
populations, since these groups may be more at risk or susceptible to the effects
of photochemical oxidants than normal  healthy Individuals.   The  following results
have been obtained:

     -  In  preparation   for  studies  on  the  effects  of   inhalation  of .03  on
        "individuals with an inherited enzyme deficiency,  which  1s found
        primarily in Blacks,  baseline  pulmonary  function  data  on   the  control
        population (healthy  Black  males)  have  been  obtained.    The  baseline
        pulmonary function data differ from that obtained from normal
        healthy White males.

     -  Methods to identify Individuals with hyperreactlve airways, who
        are probably  more  sensitive  to  air  pollution  exposures,  have  been
        developed using a pharmacological  bronchial challenge.

     -  Vitamin  C  deficient  animals  were  found  to have increased  suscepti-
        bility  to NO? but not 03 with respect to pulmonary edema.  The
        results suggest  the  potential   existence  of  a  sensitive  human  sub-
        population.

     -  Young  rats exposed to  ambient  levels  of  03  were  found  to be  more
        susceptible than mature animals with respect to changes  1n pul-
        monary  function and structure.

     The research  efforts to develop  the dose-response  relationships  for  bio-
chemical and  Immune effects produced data which Indicate  that serum  Vitamin E
levels 1n humans increased  in a dose dependent  fashion over an  exposure range of
up to  .4  ppm  03.  The results  are  suggestive  of  activation of  a protective
mechanism.
                                       A-22

-------
     The research  to  develop the  dose/response  relationship  for pulmonary  ef-
fects for  exposures  to  03  below  .4 ppm has  produced a  result that  indicates
an effect on pulmonary function 1n  some healthy  non-smoking young men at  concen-
trations as  low  as .12  ppm,  which  is the  current 1-hour standard.   Short-term
exposures to concentrations  of  03  as  low as  .26  ppm  caused pulmonary edema  in
animals.  This latter response had not been  previously  reported.

     The research to determine the likelihood of  effects on the total  body system
(systemic effects) resulting  from  inhalation  of  photochemical  oxidants  indicated
that the clearance of drugs  from animals exposed  to 03 was decreased by comparison
to non-exposed animals.  This result was  not observed with NOg  exposure, however,
suggesting a systemic effect of  03 exposure.

1982 Explanation pf Changes from January  Budget Estimate

                   January        March        Current
                   Estimate      Estimate      Estimate

                 $6.691,200    56,542,400    J5.215.000

     The net decrease  of -$1,476,200 results  from several actions, as follows:

                - March.    (-$148,800)   This  change  represented  a  decrease  of
     SI 48, 800 from  the  January  budget,  of  which $9,800  was  for  Salaries  and
     Expenses and  $139,000 was  for  Research  and Development.   This  decrease
     resulted in  the  elimination  of epidemiological  studies  performed by  EPA
     laboratories on chronic effects of oxidants and  nitrogen oxides.

     -  Reprograimiing. (-$1,110,000)  This  transfer of resources from the oxidants
     program to the mobile  sources  program consolidates carbon  monoxide  research
     activities under the mobile  sources  research committee.  The effect of  the
     transfer is for  consolidation  purposes  only  and does  not affect  any planned
     research.  This  transferring  of  planning  responsibility  has  already  been
     implemented by the  research committees  involved.   (This  reprogrammf ng  was
     included in a letter to Congress on December 16, 1981).

     -  Congressi onal  Actions.  (-$217,400)  An  additional  reduction of -$217,400
     was applied  to the  salaries  and  Expenses appropriation  to  meet  Congres-
     sional ly mandated appropriation levels.

     "  Transfer AuthofJ! ty '-  (No Change)  The net change applied to this  activity
     is made up  of  a  decrease of -$303,600 from Research and Development and an
     increase of +$303,600  to Salaries and  Expenses.  The increase  will permit
     the purchase of essential supplies and equipment and other critical  expenses.

1982 Program

     In 1982, the Agency  is allocating  a  total  of $5,215,000 and  15.7 permanent
workyears to this program, of which $1,410,200 is under the Salaries and Expenses
appropriation and $3,804,800  is  for extramural  purposes  under the Research  and
Development appropriation.

     While much of  the work In this health  research program  is  focused  on  dose/
response relationships the  actual work  can be divided  into five research areas:
systemic effects;  cardiovascular effects;  respiratory  effects; immune  effects;
and metabolic effects.

     Systemic effects (affecting the  entire  body system)  of  oxidants inhalation
are being evaluated in the  laboratory in animals and humans; the effect  of  ozone
on systemic  uptake  of serotonin (an  amine which affects smooth muscle  tissue),
and systemic effects  of oxidant  exposure on  human  groups at  risk (asthmatics  and
persons with  chronic  obstructive  lung  disease) will   be   reported  in  1983.
                                      A-23

-------
     Studies on the effects of  NQ2  and 03 on serum lipids, a measure  of  cardio-
vascular degradation in animals,  are  being undertaken to evaluate the  extent of
changes in  serum  lipids as  early indicators  of cardiovascular disease.   Serum
lipid levels in humans  exposed under  controlled experimental  conditions to  H02
and Ch  have been  known to  change,  raising  the  question  of  the human  health
significance of this response.

     Respiratory effects (pulmonary  function, tissue  structure changes,  tissue
sensitivity) of Inhalation of photochemical  oxidants (03, M02) are being  evalu-
ated in human clinical  and animal  studies to  Improve exposure-response relation-
ships, particlarly for low exposure levels.

     Immune and biochemical  effects are  being  studied  in human subjects  1n  the
laboratory to relate Indicators of biological  activity to disease susceptibility.
Specifically, the  resulting   effects  of  MO^  exposure  on  viral  infectivity  1n
healthy humans and  persons  with  enzyme  deficiency provide sensitive  indicators
for determining the extent to which human response to infections is modified by
exposure to air pollutants.

     Metabolism data  and  Inhalation  dosimetry  of  photochemical  oxidants  (03,
N02) are being obtained from animal  experiments to develop and improve  extrapola-
tion models  for predicting  human  risk  from  animal data.  The  biochemical  model
of ozone uptake in rat lungs will  be completed and will  improve the cross-species
extrapolation model for inhalation of reactive gases.

1983 Program Request

     The Agency requests a total  of $3,090,900 and 16.6  permanent workyears  for
this program, of which  $1,138,700  Is  for Salaries and Expenses and $1,952,200 is
for Research and Development.  This reflects a decrease of  $271,500 and $1,852,600,
respectively, which results  from  efforts  to  more efficiently'schedule or phase
the work needed for the criteria  update and  still meet the Congressionally man-
dated 5-year review cycle.   Therefore,  there  1s a reduction  in  emphasis  1n 1983
in the research on extrapolation model development, systemic effects,  biochemical
and immune  effects and  respiratory  effects relating to inhalation toxicology of
photochemical oxidants.  Research  in these areas  is still considered important
for future  ozone  criteria  documents  but  will be  conducted at a slower  rate in
1983.

     The objectives of this health research program in 1983 will  be:  to determine
if the early symptoms  (clinical and  subclinlcal)  are causally related to  disease
processes associated with exposures  to photochemical  oxidants; to identify suscep-
tible population groups for the health  endpoints  of concern  (systemic  effects,
cardiovascular effects, immune  effects and respiratory effects); and  to  develop
pertinent models  for  extrapolation  (transformation) of  animal  data  to  assess
risk to humans.

     The major  effort  in 1983  will  continue to  be to  develop  a viable  human
(clinical)  studies program endeavoring primarily to  ascertain  the  sensitivity of
susceptible populations to  exposures to  03   and  NO?.   This Is  an  area that is
important to the 5-year update of  the appropriate criteria documents.

ENVIRONMENTAL ENGINEERING AND TECHNOLOGY
1981 Accomplishments

     In 1981, the Agency  used a total  of  $1,226,300  for this program,  of  which
$552,200 was under  the  Salaries and Expenses appropriation and  $674,100 was for
extramural purposes under the Research and Development appropriation.

     Projects were  completed  in two general program  areas:  (1)  volatile organic
compounds (VOC)  emissions,  and  (2)  supercritical,  fluid  solvent  extraction.
                                      A-24

-------
     A number  of  projects  came to  fruition 1n  the  volatile  organics  program
during this fiscal year,  wide-ranging  assistance  was provided to OAQPS  for the
development of  New  Source  Performance  Standards  (NSPS).   Specific  regulations
for which support was provided Included  several  Involving fugitive VOC emissions.
Emission data  needed  by OAQPS  was developed for  several  Industrial  processes,
Including flexible packaging,  drum-mix  asphalt plants,  metal  degreasing  opera-
tions and  synthetic  organic  chemical  plants.  Response  factors were  developed
for standard portable hydrocarbon  detectors  and for 160 different chemicals and
chemical mixtures.  General  design parameters  were  developed for several  types
of VOC  controls  (including  capture systems,  carbon  adsorption,  and  catalytic
oxidation), and controls for metal  degreasing operations were evaluated.

     The objective of recapturing  gasoline vapors and  industrial  solvents  moved
closer to  reality with  the completion  of laboratory  testing  of a  method  for
supercritical fluid solvent extraction,   this project demonstrated the effective-
ness of  supercritical fluid carbon dioxide  solvent  extraction  for  regenerating
granular activated carbon used to adsorb hydrocarbons from air streams.

1982 Explanation of Changes from January Budget Estimate

                   January        March         Current
                   Estimate      Estimate     Estimate

                 $2,410,000    $2,333,600   $1,184,800

     The net decrease of -$1,225,200 results from several actions,  as follows:

     ~  January - March.   (-$75,400)    This   change  represented  a  decrease  of
     $76,40U from theJanuary  budget,   of  which  $8,800  was for  Salaries  and
     Expenses and $67,600 was for Research and Development.

     ~  C^ng£ess1ona'l- Actions.   (-$1,148,800)   A  reduction   of  -$1,099,600  was
     taken agiifist the Marcfi  estimate reflecting  the September  12%  reduction to
     the Research  and Development  appropriation.   An additional  reduction  of
     -$49,200 was applied  to  the  Salaries  and Expenses  appropriation  to  meet
     Congressionally mandated appropriation levels.

1982 Program

     In 1982 the  Agency 1s  allocating  a  total of $1,184,800 and 9.6  permanent
workyears to this program,  of which $603,800 is under  the Salaries  and Expenses
appropriation and $581,000  1s  for extramural  purposes under  the Research  and
Development appropriation.

     The program  1s  focused sharply on providing  Information on a few critical
technical Issues to support  the  development of regulations being prepared by OAQPS.
Two types of research are Included: (1)  evaluating generic control systems appli-
cable to  industrial  processes  and (2)   characterizing  and  predicting  emissions
from Industrial processes.   More  specifically, evaluations  of  generic  control
methods such  as  effective   systems  to  capture  emissions  which contribute  to
oxidant formation; and catalytic oxidation,  carbon adsorption and thermal oxida-
tion for  oxidant precursors  are  being continued.   In addition,  characteriza-
tion research  is  continuing  for  metal  coating.   This information  is  used  by
States to  develop cost-effective  NSPS  Implementation  programs  and  to document
emission factors.

1983 ProgramRequest

     The Agency  requests  a  total  of  $2,364,400  and  6.7  permanent  workyears
for this program, of  which  $761,700 is for  Salaries  and Expenses and $1,602,700
is for  Research  and  Development.   This  reflects  an  Increase  of $157,900  and
$1,021,700, respectively,  which reflects  a  consolidation  of  research  on  VOC
control technology, catalytic incinerators, inhalable participate emission
                                       A-25

-------
factors, and  technical  support  to the  non-ferrous  smelter  order program  from
the Gases  and Particles  and Hazardous  Air Pollutants  programs.  However,  the
combined control   technology program  reflects  a  slight  overall  decrease  as  a
result of reduced regulatory need.

     The objective of  the program 1n 1983  is  to  assess  control  technologies  so
that appropriate,  cost-effective performance standards  can  be  established.   At
the present time, there is a lack of credible information on  the actual  costs  of
effective energy-efficient  controls  for  the many  medium and   small  industrial
sources.

     Consistent with the  emergent regulatory needs,  research In 1983 will  con-
tinue to focus on two types  of data  gathering:  (1) the  effectiveness  of control
measures; and (2) emission factors.  Control measures for which evaluations  will
continue include  carbon  adsorption,  thermal  oxidation,  catalytic oxidation,  and
flares and  capture  systems (Including hoods).   Collection of emission  data  will
continue on metal  coating operations and  on inhalable  particulates  from metal-
lurgical sources.  Additionally,  work will  continue to implement the  research
portion of the non-ferrous smelter order  (Section 119, Clean A1r Act, as amended).

ENVIRONMENTAL PROCESSES AMD EFFECTS

1981 Accomplishments

     In 1981, the Agency  used  a  total of  $5,793,500  for this program,  of  which
$1,744,500 was under the  Salaries and Expenses appropriation and $4,049,000 was
for extramural purposes under the Research and  Development appropriation.

     The work  in this  program  has  focused on  two  primary areas of  concern,
1) the  development of  scientific information  on the  effects  of photochemical
oxidants on crops, ecosystems  and materials to support  the  revision  of national
and/or regional  secondary  (welfare)  standards for photochemical  oxidants;  and
2) the  production,  evaluation,  and  upgrading  of  air quality  models  needed  by
States and OAQPS to develop, adopt and enforce  cost-effective control  strategies.
Specific examples are outlined in the following material.

     Results from field  studies  provided dose-response data  which quantitatively
describe the Impacts of  ozone  on several  important  crops at  locations across the
United States.   Ambient ozone concentrations caused yield reductions of 10% for
Soybeans, 14%  for peanuts, 50%  for  head lettuce,  and 2%  for red  kidney beans.

     Results from the exposure of a large number of crop  species to N02 indicated
that foliar Injury from MO? was much  greater  from nighttime exposure when compared
with exposures during daylight hours.  Thus, there Is a  need  to consider day and
night conditions in the evaluation of air quality criteria and control  strategies
involving M02.

     Research which addresses the phytotoxic  effects of the photochemical oxidant,
peroxyacetyl nitrate (PAN), continued.  The results indicated that PAN can Impact
the yield and the marketability of leafy  vegetable crops, and should be considered
in a review of ozone air quality criteria.

     Although the present ambient air quality  standards are  national  standards,
there is the  possibility  that  some  of these' standards  could  be regionalized in
the future.  Therefore, research continued that evaluated the Interaction
between regional   environmental  factors  and  plant  growth/yield  responses  to
ozone, 1n  order  to develop Information for the possible  regionalizing  of air
quality standards.  Initial  results have  shown  that  small depressions  1n plant
water availability  significantly decrease  the  sensitivity  of  plants to ozone,
which probably results from reduced pollutant uptake.
                                      A-26

-------
     In order  to  assess the  contribution of  biogenically emitted  hydrocarbons
to regional  ozone  formation,  biogenic  emission  factors  were   developed   for
isoprene and monoterpenes  for several  Important  deciduous and coniferous trees
representative of the northeastern United States.

     Four photochemical air quality  simulation  models  which were  developed  over
the last few  years have undergone  preliminary  evaluations for accuracy 1n  pre-
dicting ozone  concentrations   on  the  urban  scale.  These  urban  photochemical
models were tested against a  comprehensive air quality data base  obtained  in the
1972-1977 air- pollution field study in St.  Louis.  Once evaluated  and  verified,
these models will  be  used  to assess  and  develop  ozone  control  strategies  for
urban areas, where the Empirical Kinetic Modeling Approach  (EKMA) is not suitable,
especially those In non-attainment areas.

     EKMA was evaluated against a  historical data base to determine the effective-
ness of this technique to  predict ozone control  strategies.   It  1s  anticipated
that EKMA will  be  the major modeling approach used by States in  the 1982  implemen-
tation planning process for ozone control.

     A regional air quality ozone model has been  formulated based  on  air quality
data collected during  the  1978-1979  Northeast  Regional  Oxidant  Study  (NEROS).
This model, when developed  and evaluated,  will  allow the decision  maker  to  evalu-
ate the impact  of oxidant  control plans  of Individual cities  from a regional
perspective.

     The roadway  emissions  characterization study  was  initiated  to assess  the
contribution of  specific  ozone  precursors,  namely volatile  organic  compounds
(VOC) from  in-use  motor vehicular  sources.  This work  will  be used to develop
more realistic emission input data  and to  evaluate ozone  air quality models.

1982ExplanationofChangesfromJanuary Budget Estimate

                   January         March        Current
                   Estimate      Estimate    Estimate

                 $7,229,100    $7,072,900  $6,993,200

     The net decrease  of  -$235,900 results  from several actions, as follows:

     * _*!a!MT" ti|arcn-  (-5156,200)   This  change represented  a  decrease  of
     $156,zoo from the January budget,  of which  $11,200 was  for Salaries  and
     Expenses and  $145,000  was   for  Research   and  Development.   This decrease
     resulted in reduced efforts  in assessing  the effects of ozone and nitrogen
     dioxide on crop yield  and vegetation.

     ~  Reprogramming.  (-$16,700)  This  Agency-wide reprogramrning provided  re-
     sources for transfer of the  accountability  function  to the  Office of Manage-
     ment Systems and  Evaluation  and,  In addition,  provided additional  resources
     for the Immediate Office  of the Assistant Administrator for Solid  Waste and
     Emergency Response.  (This reprogrammlng was Included In  a  Tetter to  Con-
     gress on December 16,  1981).

     -  Congressional. Action.   (-$63,000)   A  reduction  of  -$16,.0.00  was taken
     against the March  estimate  reflecting  the  September 12S  reduction  to  the
     Research and Development appropriation.  An additional reduction  of -$47,000
     was applied to the Salaries  and Expenses appropriation to meet Congression-
     al ly mandated appropriation  levels.

     -  Transfer Authority.   (No  Change)  The net  change  applied to  this activity
     1s made up of a  decrease of  -$186,800  from Research and Development and  an
     increase of +$186,800  to Salaries  and Expenses for the purchase of a diode
     array rapid scanning spectrometer to  establish products of  photo-oxidation
                                    A-27

-------
     reactions; for an  Increase -to  travel  to  attend two meetings;  and for repair
     of scientific equipment.  Additional  funds will be used  to meet shortfalls
     in laboratory operations  1n such  areas  as utilities,  basic  maintenance of
     the physical plant,  and fabrication  of  research  equipment  used to support
     inhouse research operations.

1982 Program

     In 1982, the Agency  is allocating a  total  of  $6,993,200  and Z0.9 permanent
workyears to this program, of which $1,896,800 is under the Salaries and Expenses
appropriation and $5,096,400  is  for  extramural  purposes under the  Research and
Development appropriation.

     Field assessment  of  the  impacts'  of  ozone  on crop  production  within the
United States  is being continued  to  provide  additional   and  repetitive  dose/
response data for determining  the economic Impacts of  ozone.   Research  is being
focused on agronomic  impacts at six  sites across the  United  States.  The yield
response of  crops  which have a high  economic value is being  studied to provide
scientific information  for  the economic concerns relevant  to  air pollution con-
trol strategies.

     The impacts of  K02 singly and in  mixture  with  other  gaseous pollutants on
the growth and  productivity  of vegetation have not been well  defined.   Studies
will focus on   field-oriented  research to evaluate  the response  of crops and
forest species to NOg and  the Interactive effects of other gaseous air pollutants.
This research  was  initiated  to  provide information that  was not  available in
the recent A1r Quality Criteria Document for NOx.

     Research which addresses  the effects  of the  oxidant,  peroxyacetyl  nitrate
(PAID on  crop  yield   is  being  completed.   A  document relating dose-response
functions for ambient  concentrations  of PAN  with crop  Injury  and yield will be
published.

   - Research which evaluates the  interactive effects  of soil  moisture  with the
response of various  crop  species to  ozone will  continue to provide a knowledge
base for predicting  crop losses  associated  with  ambient  concentrations  of 03
and moisture conditions.  Results  will  be  used in evaluating crop/forest impacts
based on soil moisture factors and air quality.  This research primarily supports
the reviews of the secondary ambient air quality standards;  however, dose/response
information will also  be  obtained to reflect regional  variations  in climate and
soil conditions.  This Information can then be applied to the possible reglonali-
zation of the air quality standards.

     Data bases which document agriculture productivity and air quality are being
assessed and integrated to provide Input for  regional level  models which will be
used to evaluate the  economic impacts of  ozone  on  crop production in the United
States.  This data analysis  provides  the  initial framework  for an assessment of
cost/benefit relationships relevant to air pollution control options.

     The evaluation  and verification  of  urban  photochemical   models for  ozone
are being completed.   The  results will specify  the  accuracy expected from these
models and  recommendations   on  their  usage  for  evaluating cost-effecive  ozone
control strategies.   In addition,  these models  are  being  modified  in  order to
predict NOg air quality, including short-term dosages.

     The evaluation  studies  of  the  first  generation  EKMA  model  are  being
completed using  smog  chamber  studies  and historical  trend data analyses.  In
addition, specific  recommendations will  be  provided  to Improve  the predictive
capability of the models.

     Outdoor smog  chamber  studies  are being conducted to  develop  quantitative
information on  the  contribution  of  VOC/NOX  mixtures  (both   synthetic  VOC/NOX
and real  auto-exhaust mixtures)  in  producing ozone.   The  data will  be used to
improve the predictive capability of ozone air quality models.
                                      A-28

-------
     The photochemical reactivity of  selected  organics  to produce ozone is being
determined by laboratory studies.  The second phase of  a  roadway emissions char-
acterization study will be  completed.  Air pollutants are being measured along a
roadside to assess the motor vehicular contribution of ozone precursors especially
aldehydes and other volatile organic compounds.

     Work on developing a regional  ozone model  is focusing  on  the comprehensive
data analysis and reduction  of field data collected during the Northeast Regional
Oxidant Study (NEROS) program.

     A reactive plume model   Is  being developed  and evaluated using existing data
bases.  This model will be  used to determine the  contribution  VOC emissions from
individual stationary sources, e.g., refineries, play  1n producing ozone downwind
of the  sourcet   The  program office needs  this type  of  model  1n  assessing the
impact of VOC control plans  for stationary sources.

1983 Program Request

     The Agency requests a  total  of $4,007,400 and 18.9  permanent workyears for
this program, of  which $1,375,400 is  for Salaries and Expenses and $2,632,000 is
for Research and Development. This reflects a decrease of  $521,400 and $2,464,400,
respectively, which results  from efforts  to  more efficiently schedule the research
needed and  still  meet the mandated 5-year  review cycle.  Therefore,  there Is a
reduction in the level of effort associated with the crop loss assessment program,
the urban scale  ozone modeling program,  and the biogenic  emissions measurement
program, and a termination  of the roadway  emissions characterization  studies on
oxidant precursors (VOC/NOX) in 1983.

     Laboratory research will continue to  address and quantify  the role of envi-
ronmental factors  (Including soil moisture and  solar  radiation) on  the growth
and yield responses of crops to  ozone,  since these factors greatly Influence the
effects of air pollution.   The data from  previous  field  research will be organized
into dose-response functions.  Using these data, technical Information and assis-
tance will be provided to  the Agency's program  and Regional Offices, and to State/
local governments, on damages  and costs  associated with  the effects  of oxidants
on economically Important agricultural crops.  The program is closely coordinated
with the Gases and Particles research.

     Laboratory studies will be conducted to assess the contributions of biogenic
emissions of terpenes and   isopenes  1n  producing evaluated  ozone  levels.   Both
smog chamber and trajectory  modeling studies will be used to make this assessment.
These biogenic  emissions  may  contribute  to  the hydrocarbron  reactions  in the
formation of ozone.

     Carefully designed smog chamber studies will  continue to focus on the photo-
chemical reactions  of VOC/NOX mixtures  to  simulate  ozone generation,  in order
to support  the  existing  urban oxidants models  and  the  regional  photochemical
oxidant models  which are  under development.   Aromatic  compounds,  an important
class of  VOCs  will be emphasized in  these studies to  reflect  the increased use
of aromatic compounds in the formulation of automotive fuels.

     The research  program to develop a  regional  scale model  for  ozone  will  be
continued.  A regional model  will  be developed and tested  against the NEROS air
data base and  will  be improved  for accuracy where necessary.   In addition, the
preliminary plans  will  be developed to  test the  applicability  of this model to
other areas of the  United States.   The  regional model  will  be  used by State and
Regional officials to calculate the extent  of  ozone  transport from  one area to
another.  While the  regional  model  will  be  formulated  to predict regional ozone
levels, it is designed to be used also for modeling regional scale fine particles
sulfate concentration  and   transport.  This program is  closely  Integrated with
the Gases and Particles modeling research area.
                                      A-29

-------
                                                                AIR


                                                Hazardous Air Pollutants Non-Energy
u>
o

ACTUAL
1981
JANUARY MARCH CURRENT ESTIMATE INCREASE +
ESTIMATE ESTIMATE ESTIMATE 1983 DECREASE -
1982 1982 1982 1983 VS 1982
(DOLLARS IN THOUSANDS)
PROGRAM
Scientific Assessment
Salaries ft Expenses
Research ft Development
Technical Information
& Liaison
Salaries ft Expenses
Research 4 Development
Monitoring Systems ft
Quality Assurance
Salaries 4 Expenses
Research ft Development
Health Effects
Salaries ft Expenses
Research ft Development
Environmental Engineering
& Technology
Salaries ft Expenses
Research ft Development
Environmental
Processes 8 Effects
Salaries 8 Expenses
Research 4 Development
$1,192.7
$546.6
$95.8
$3.1
$1,664.2
$1,559.2
$1,348.5
$1,799.6
$189.4
$455.5
$309.0
$735.4
$1,163.8
$416.7
$103.4
$6.1
$2,391.0
$1,278.5
$1,018.2
$2,296.9
$232.6
$584.6
$399.4
$1,159.5
$1,155.4
$406.4
$103.4
$6.1
$2,364.6
$1,253.1
$1,637.5
$1,496.9
$226.3
$562.0
$396.8
$1,159.5
$1,285.0
$256.1
$96.5
$1,919.3
$957.7
$1,414.9
$1,292.3
$276.9
$495.9
$346.5
$1,032.5
$1,333.2
$675.0''
$85.9
$1,729.9
$1,013.9 ,/
$1,476.1
$865.8 y

$316.6
$498.0^
$48.2
$418.9
-$10.6
-$189.4
$56.2
$61.2
-$426.5
-$276.9
-S495.9
-$29.9
-$534.5

-------
                                                 AIR
                                 Hazardous Air Pollutants Non-Energy
ACTUAL
1981
JANUARY
ESTIMATE
1982
(DOLLARS IN
TOTAL:
Salaries & Expenses
Research & Development
Hazardous Air TOTAL
Pollutants Non-Energy
PERMANENT FULL-TINE WQRKYEARS
Scientific Assessment
Technical Information
4 Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental
Engineering I
Technology
$4,799.
$5,099.
$9,899.
22.
1.
37.
23.
2.
6
4
0
0
7
0
9
3
$5,308.
$5,742.
$11,050.
25.
2.
35.
6.
3.
MARCH
ESTIMATE
1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE •
1983 DECREASE •
1983 VS 1981
THOUSANDS)
4
3
7
0
2
0
1
6
$5,884.
$4,884.
$10,768.
25.
2.
35.
21.
3.
0
0
0
0
2
0
1
6
$5,339
$4 ,€34
$9,373
23
2
33
21
3
.1
.5
.6
.8
.2
.9
.1
.6
$4,941.
$3,052.
$7,994.
21,
1.
30.
21.

7
7
4
0
2
1
1

-$397.4
-$981.8
-$1,379.2
-2.8
-1.0
-3.8

-3.6
Environmental
Processes ft Effects
 5.0
 6.0
 6.0
 6.0
 3.9      -2.1
TOTAL PERMANENT WORKYEARS
91.9
77.9
92.9
90.6
77.3     -13.3

-------
                                                 AIR

                                 Hazardous Air Pollutants Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE *
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
TOTAL MORKVEARS
Scientific Assessment
Technical Information
4 Liaison
£ Monitoring Systems *
Quality Assurance
Heal tti Effects
Environmental
Engineering 4
Technology

30.0
3.5
42.4
25.8
4.7

36.7
3.1
40.1
9.3
6.3

36.7
3.1
40.1
24.3
6.3

34.6
3.1
39.0
24.3
6.3

29.6 -5.0
2.1 -1.0
34.0 -5.0
23.7 -.6
-6.3
Environmental                           5.0        6.0        6.0        6.0        3.9      -2.1
Processes £ Effects

TOTAL HORKYEARS                       111.4      101.5      116.5      113.3       93.3     -20.0

-------
                                 AIR

                    Hazardous Air Pollutants Non-Energy

Budget Request

     The Agency requests a  total  of $7,994,400 and 77.3 permanent  workyears  for
1983, a decrease of 51,379,200 and 13.3 permanent workyears  from 1982.  Included
In this total 1s $4,941,700 for Salaries and Expenses and $3,052,700 for Research
and Development, with  a decrease of  5397,400 and $981,800,  respectively.   This
decrease 1s  due  primarily  to the transfer  of the control technology  program to
the Oxldants Non-Energy  program,  and  also  to a  reduced emphasis  on  developing
source models and providing  transport and fate data due to  a lessened regultory
office need for these data.

Program Descrljttlon

     The Hazardous  Air Pollutants  Research  Program responds to the  regulatory
needs of  the Clean  Air Act under  Section  112,  "National  Emission  Standards
for Hazardous Air Pollutants" (NESHAPS) and Section 111, "Standards of
Performance for New Stationary Sources" (MSPS).  The program addresses:
(a) the  human  health   risks associated  with  exposure to   certain  potentially
hazardous ambient  air  chemicals;  (b)  the  sources  of  those  chemicals;  and
(c) the  technical  feasibility  and  costs  of  reducing human  exposure to  those
chemicals.

     To determine  the  above,  the  Hazardous  Air  Pollutants program  Identifies
and screens  potential   hazardous  air  pollutants  (HAPs).   Identification  and
screening are necessary to  ascertain  contaminant presence, concentration, trans--
port, transformation, persistence and health effects.

     Risk assessments are then conducted.  These assessments  Involve the  evalua-
tion and Interpretation of health and environmental  data to permit the determina-
tion of the  potential  for  human risk.  These risk assessments  are  combined with
preliminary exposure analyses  to provide estimates  of the degree  of population
risk and disease Incidence.

     To properly make  these  estimates, research Is conducted to develop  systems
for bloassays, dose response relationships, exposure-effect relationships, source
apportionment models,  characterization  studies,  new  and  improved  monitoring
systems and  provisions  for  Information  validation  through   an  adequate  quality
assurance program.

SCIENTIFIC.ASSESSMENT

1981 Accgmpl1shments

     In 1981, the Agency used  a total of  $1,739,300  for this program, of  which
$1,192,700 was  under  the  Salaries  and Expenses  appropriation  and  $546,600  was
for extramural purposes under the Research and Development appropriation.

     The Scientific Assessment  program provided  two  types of  health  assessment
documents which  served  as  the  basis  for  prioritizing  and  understanding  the
health hazard  of pollutants which  are  candidates  for  regulatory  evaluation.
Twelve screening assessments were completed,  as  were  six full health assessments
(trichloroethylene, tetrachloroethylene,  methyl   chloroform,  methylene  chloride
chlorofluorocarbons, and toluene).

     Identification and screening assessments are necessary In order to determine
what contaminants are present or are projected to be In the air, and to determine
their concentration, transport, transformation and persistence 1n the atmosphere.
                                     A-33

-------
 To address  this  information  gap,  the  program currently  includes  studies  to
 summarize existing  effects  and  chemical  data  for  ambient  air.  The  result  of
 these studies, plus the results  of pilot  field  studies  in progress,  will  be used
 to select chemicals as candidates for regulation.

      The second type  of assessment  is a  health  risk  assessment  on  substances
 selected during  identification   and   screening.   Risk  assessments  involve  the
 evaluation and  Interpretation of  available  health  and environmental  data  to
 permit tire determination of the  potential for  human  risk.   The risk  assessment
 document provides  the  scientific health  and environmental   basis  from  which  a
 determination can  be made  if the  exposure  to a  pollutant can  reasonably  be
 expected to  result in  Irreversible  or  incapacitating  reversible  Illness.   The
 risk assessments are  then  combined  with preliminary exposure  analyses  to  pro-
 vide quantitative estimates of degree of population  risk and  disease
 incidence.

 1982Explanation of Changes from Jan

                     January       March         Current
                    Estimate      Estimate      Estimate

                  $1,580,500    $1,561,800    $1,541,100

      The net  decrease of  -$39,400  results  from  several  actions,  as  follows:

      *  January - March.   (-$18,700)   This   change  represented a   decrease  of
      $18,/uu from  the January  budget,  of which  $8,400 was  for  Salaries  and
      Expenses and $10,300 was  for Research and Development.

      *  RePr°graTing.  (-$20,700) During the development of the operating  plan,
      Several  miscellaneous reprogrammings, which are not reportable  to Congress,
      were made  to  this  activity  and  resulted  in a  net decrease  of -$20,700.

      -  Transfer Authority.   (Mo Change)   The net  change applied to this  activity
      is made up of  a  decrease of -$150,300 from Research and Development and an
      increase of +$150,300 to Salaries and Expenses.   The increase  will  provide
      funds to maintain basic operations  for  office  supplies, reproduction,  lease
      of equipment, etc.

 1982 Program

      In 1982, the Agency Is allocating a total  of $1,541,100 and 23.8 permanent
 workyears to this program,  of  which $1,285,000 is  under  the Salaries  and  Expenses
 appropriation and  $256,100  1s  for extramural  purposes under  the  Research  and
 Development appropriation.

      The 1982 program 1s similar to  the one 1n  1981  1n that  a combination  of
 screening and full  health assessments  are  being  initiated, finished,  and,  as
. required, sent to  the Agency  Science Advisory  Board  for review.  To more  fully
 support the regulatory schedule, more  emphasis  is being placed  on health  assess-
 ments versus  screening  assessments.   The six  assessments  from 1981  are  being
 monitored through the Science Advisory Board review and approximately three new
 assessments are being initiated.  Screening assessments  will be Initiated if the
 program office decides there  is  a  need to screen a limited  number   of   andidate
 substances.

 1983 Program Request

      The Agency requests a total  of  $2,008,200  and  21.0 permanent workyears for
 this program, of  which  $1,333,200  is  for Salaries  and Expenses  and  $675,000
 is for  Research and  Development.   This  reflects  an  increase of  $48,200  and
                                      A-34

-------
$418,900, respectively.  This  increase 1s  consistent  with the  greater  emphasis
that has  been  placed  on  the  development  of  comprehensive  health  assessment
documents.

     As part of the Office of  A1r Quality Planning and Standards (OAQPS) program
to identify  and prioritize  candidate  hazardous substances  which warrant  more
in-depth regulatory  analysis,  the  scientific  assessment  program will  provide
ten screening assessments.  Three full, health assessments  begun in 1982 will  be
finalized, and approximately five  other new assessments will  be initiated.   The
Office of Health and  Environmental  Assessments will also provide  support to the
Regions to define the nature of health hazards at local sites.

TECHNICAL, IHFORMTION AMD LIAISO^

     Refer to  the   0x1 dants  Non-Energy  narrative  for  a  description   of  those
Technical Information  and  Liaison  activities that  are common  to all  research
and development  budget  sub-activities.   Activities  specific  to  this  budget
sub-activity are indicated in the program element description below.

1981 Accomplishments

     In 1981, the  Agency  used a total  of $98,900  for this  program,   of  which
$95,800 was  under  the  Salaries  and  Expenses  appropriation and  $3,100   was  for
extramural purposes under the Research and Development appropriation.

     Specific accomplishments included sponsoring  the  symposium, Monitoring Haz-
ardous Pollutants  In  Air,  and  publishing  a  report  entitled,  Environmental
Regulations and Technology for the Dry Cleaning Industry.

1982 Explanation of Changes from January Budget Estimate

                   January         March          Current
                  Estimate       Estimate       Estimate

                  $109,500       $109,500        $96,500

     The net  decrease  of  -$13,000  results from  several  actions,  as  follows:

     -  Reprogramming.  (-$200)  This Agency-wide reprograrming provides
     resources for  transfer  of  the  accountability function  to  the  Office  of
     Management Systems  and Evaluation  and,  in  addition, provides  additional
     resources for  the  Immediate   Office   of  the  Assistant  Administrator  for
     Solid Waste and  Emergency  Response.   (This  reprogramming  was included  In
     a letter to Congress on December 16, 1981).

     "  Congressional  Actions.   (-$12,800)  An  additional   reduction of  -$12,800
     was applied to theSalaries  and  Expenses  appropriation to meet  Congres-
     sionally mandated appropriation levels.

     -  Transfer Authority.  (No Change)  The net change applied to this activity
     is made up  or a  decrease  of -$6,100  from  Research and  Development and an
     Increase of +$6,100 to  Salaries  and  Expenses to  cover essential  operating
     costs.

1982 Program

     In 1982,  the  Agency  is  allocating  a total  of  $96,500  and 2.2  permanent
workyears to  this  program,  all   of  which  is under the  Salaries and  Expenses
appropriation.

     The 1982 activities include  a  conference on  the  state-of-art of  monitoring
and sampling methods.
                                    A-35

-------
1983 Pro gram Reqiiest

     The Agency requests a total  of  $85,900  and  1.2 permanent  workyears  for this
program, all of  which 1s for  Salaries and  Expenses.   This reflects  a  decrease
of 310,600,  due  to  a decision  to  reduce  the  amount  of technical  Information
published and liaison support provided.

     In 1983, the Technical  Information and Liaison program will  stress
providing the  necessary  technical   Information  to States and  local   officials
1n support of their increased role In administering environmental  programs.

           SYSTEMS AMP QUAIITY ASSURANCE
1981 Accompli shments

     In 1981, the Agency  used  a total of  $3,223,400  for this program,  of  which
$1,664,200 was under the  Salaries and Expenses appropriation and  $1,559,200 was
for extramural purposes under the Research and Development appropriation.

     Research was conducted  to provide analytical  methods to support the review
and possible revision of  regulations.  A  revised provisional  method for analysis
of airborne  asbestos  through  the use  of transmission  electron microscopy  was
drafted and circulated  for review.  A preliminary assessment of data from analyses
of filters containing  asbestos in an  urban parti cul ate matrix  Indicated that a
process for preparing  reference filters  for quality assurance may  be developed.

     Research to support regulatory development resulted in a method for measuring
polychlorinated biphenyls  1n  natural  gas  lines.    Research to develop  valid"
ated methods  for  nickel,  cadmium, chromium,  acrylonltrile and  formaldehyde was
conducted.

     In the  area  of quality assurance,  testing was  completed  on  reference gas
cylinders and permeation  tubes of benzene and perchoroethylene.   This  research
is needed  so  that reference standards  can be Issued  by the National Bureau  of
Standards in  1932.   Long-term   stability  studies  on  test cylinders  of  toluene,
chloroform, carbon  tetrachlorfde, chlorobenzene  and   vinyl  chloride  were  com-
pleted; and  results indicate  that  Standard Reference  Materials (SRM's)  at the
0.10 ppm to 10 ppra levels are feasible.

1982 Explanation of Change^^^
                   January        March          Current
                  Estimate       Estimate       Estimate

                $3,659,500     $3.617,700     $2,877,000

     The net decrease  of  -$792,500  results  from several  actions, as  follows:

                " March'   (-$51,800)   This   change  represented  a  decrease  of
     $51 ,800 from  the January  budget,  of  which  $26,400  was  for Salaries  and
     Expenses and $25,400 was for Research and Development.

     -  Congressional Actions.  (-$740,700)  A  reduction of -$212,600  was taken
     from the March estimate reflecting the September 12S» reduction  to the Research
     and Development  appropriation.   An  additional  reduction  of -$528,100  was
     applied to the  Salaries and Expenses appropriation to meet  Congressional ly
     mandated appropriation levels.

     -  Transfer Author!. ty .  (No Change)  The net change applied to this activity
     1s made up  of a decrease of  -$82,800  from Research  and Development  and an
     Increase of +$82,800 to Salaries and Expenses for the increase of support to
     major in-house  projects  of the  lab; maintenance  and repair of  analytical
                                      A-36

-------
     instruments and  computer equipment; rentals  of office  equipment;  building
     maintenance; and to fund the purchase of gases and CO monitors.

1982 Program

     In 1982, the Agency  is  allocating a total of $2,877,000 and 33.9 permanent
workyears to this program, of which $1,919,300 is under the Salaries  and Expenses
appropriation and 5957,700  is  for extramural  purposes under  the Research  and
Development appropriation.

     Research to  support  the  development  of  regulations  will  result  in  a
stationary source emission test method  for  acrylonitrile.   Laboratory testing of
the source emission  continuous monitor for vinyl  chloride is  being completed.

     In the  area  of quality  assurance, the following  work is  being conducted.
SRM's for  benzene  and  perchloroethylene  are  being  developed,  and  SRM's  for
asbestos are being certified.  These SRM's are filters and/or prepared
microscope grids  containing   chrysotile and  amphibole  asbestos  filters in  an
urban air particulate matrix.  Working standards for outside  laboratories  are
being verified, and quality  assurance samples are being provided for monitoring
projects.  Sampling methods  are  being developed,  and the  sample integrity  of
organic compounds in ambient air is being assessed.

1983Program Request

     The Agency requests  a total  of $2,743,800 and  30.1 permanent workyears  for
this program, of which $1,729,900  is  for Salaries and Expenses and $1,013,900 is
for Research and Development.  This reflects a decrease of $189,400 and an increase
of $56,200,  respectively.  This net decrease is a  result  of a decision to reduce
support slightly for  the  development  of methods to  measure  hazardous air pollu-
tants in the ambient air due to the completion of several  projects.

     In support  of  the  need to screen and identify  hazardous  air pollutants, a
gas chromatograph/mass spectrometer computer method will be developed for organics
in ambient air*, a high capacity sampler will  be constructed for volatile organic
compounds; and  a  high performance  liquid  chromatography/mass  spectrometer  will
be developed for organics 1n urban participates.

     Stationary source methodology for national emissions standards for hazardous
air pollutants will be evaluated  and  validated to support  regulatory review  and
development.  Candidate pollutants  are trtchloroethylene,  carbon tetrachloride,
and methyl ene chloride.    In addition,  continuous emission monitors for designated
HAPs will  be  evaluated.   Candidate   emissions,   selected  in  cooperation  with
OAQPS, may include coke oven emissions, nickel and cadmium.

     A repository for quality assurance reference samples  and quality assurance
guidelines for HAPs will   be  developed.   Audits  for Regional  and local government
laboratories will be performed.

     Standard reference materials  {SRM's) for vinyl chloride and trichloroethylene
will be developed.

HEALTH EFFECTS
1981 Accomplishments

     In 1931, the Agency  used a total of  $3,148,100  for this program,  of which
$1,348,500 was  under  the Salaries  and  Expenses  appropriation  and  $1,799,600
was for  extramural  purposes  under the  Research  and  Development appropriation.

     In 1981,  emphasis  was  placed  on  the  identification  and  screening  of
hazardous air  pollutants,  and  on  obtaining data to  support  regulation  re-
view and  development.   Research was  conducted to  develop, improve  and utilize
cost-effective health effects assays.
                                     A-37

-------
     A rodent lung cell method was developed  and validated to aid 1n Identifying
and separating different  lung cell types  to  determine which  of  these different
cell types  metabolize hazardous   air  pollutants Into  carcinogenic  or mutagenlc
Intermediates.

     Techniques for  assaying airborne  mutagens  were  developed  and  validated.
These techniques  enable  direct   estimations  of  the  type  of  airborne  mutagen
present In the atmosphere, and the extent of human exposure.

     A cancer mortality  atlas was published.  It presents  both  historical  and
spatial data for different geographic areas.

     An animal infectlvity  model  using Intratracheal  exposures  was  validated.
This model can be used as a rapid and Inexpensive method for screening
hazardous air pollutants  on  the  basis  of  their potential  effects  on  the Immune
system.

     Inhalation studies  to  determine  what  dose  of  arsenic  trloxide  causes
Increased susceptibility to  respiratory Infection and  Impairment  of 1mmunolog1c
function were completed.

     An animal pulmonary model which allows simple, rapid  screening of chemicals
which may cause respiratory Irritation was validated.

     Bioassays to  test for  developmental   effects  of  hazardous  air  pollutants
emitted from  Industrial  sites and power  plants were  developed  and  validated.

     A completed  study on the susceptibility  of the developing  rodent to heavy
metals and  other  priority HAPs  emphasized  the  susceptibility of the  newborn to
alterations in  the development  of reproductive  function.   This   led  to a  new
approach in reproductive toxicology testing.

     Critical phases  of animal development which are  characterized by heightened
susceptibility to hazardous air pollutant effects were Identified.  This achieve-
ment narrows the range of  necessary testing, and thereby results 1n more efficient
procedures.

     Tests of brain  electrophysiology and  sensory  function,  which  may  be espe-
cially sensitive  to  the   neurotoxlc  properties  of  airborne  pollutants,  were
developed.

1982 Explanation of Changes from January Budget Estimate

                   January        March          Current
                  Estimate       Estimate       Estimate

                $3,315,100     $3,134,400     $2,707,200

     The net  decrease of  -$607,900  results  from several  actions, as  follows:

     -  Jariuary _- March.   (-$180,700)   This  change  represented   a decrease  of
     $18d ,70cJ from the January budget,  of which an Increase  of $619,300 was for
     Salaries and Expenses and a  decrease  $800,000 was for Research and Develop-
     ment.  The increase  in  the  Salaries  and  Expenses appropriation was a result
     of a  shift 1n  resources from Gases and Particles Mon-Energy Health Effects.

     -  Congressional  Actions.  (-$427,200)  An additional  reduction of -$427,200
     was applied to the Salaries  and Expenses  ($402,200) and Research and Develop-
     ment  ($25,000) appropriations to meet Congressionally mandated appropriation
     levels.

     "  Transfer Authority,  (No Change)  The net change applied to this activity
     1s made  up of a decrease of -$179,600 from Research  and Development and an
                                      A-38

-------
     increase of •'•$179,600 to Salaries and Expenses.  The Increase will  permit the
     purchase of essential supplies and equipment.

1982 Program

     In 1982, the Agency  Is  allocating a total of 52,707,200  and 21.1 permanent
workyears to this program, of which SI,414,900 is under the Salaries and Expenses
appropriation and 31,292,300  is  for extramural purposes  under the Research  and
Development appropriation.

     The identification and screening of hazardous air pollutants 1s an essential
preliminary step to more thorough testing.   For this  purpose, rapid and efficient
biological assays are  being  developed,  validated as  predictors of  significant
effects, and applied  to a broad range of  potential  airborne toxins.   Existing
valid bioassay  techniques  are  being  used  to  screen  and  Identify  potentially
hazardous compounds for four types of health effects  of concern:  (1) carcinogene-
sis and  mutagenesls;   (Z)  neurological  toxicity; (3)  teratogenesis  and  other
reproductive and  developmental  effects; and  (4)  respiratory  and  iimunologlcal
effects.

     Research to  develop   new bioassay  techniques is  being  conducted for  the
following areas of concern: (1)  carcinogenesis and mutagenesis; and
(2) neurological  toxicity  and its  behavioral  manifestations.   Improved  methods
for identifying  carcinogens   adhered to air  particles  are  being provided  and
evaluated.  This  work  1s  used to improve sampling and  fractionating  techniques.
Tests to  measure  neurochemical  changes  in  animals  and  changes  in  the  brain
function of  humans who have Inhaled  small   amounts  of  potentially  hazardous
compounds are being developed.   These  tests are designed  to indicate  the  poten-
tial for  serious  impairment-of  cognitive  or sensory  function.   The  results  of
this research will be  utilized for the Identification and  screening of hazardous
air pollutants.

     Once a  pollutant  has  been  Identified as  toxic, more detailed  research,
especially in the development of dose-response relationships,  is needed before a
decision to  regulate   or  not regulate  under  NESHAPs  can  be made.  Research  1$
being conducted in the following areas:

     -  Microbiological  assay techniques   and  evaluations  of  the  effects  of
        exposure to hazardous air  pollutants on  rodent  and human  lung  cells
        are being used to study carcinogenicity and mutagenicity.

     -  An array of electrophysiologlcal measures, tests of sensory and cognitive
        function, and  neurochemical, metabolic and anatomical  measures are being
        used to evaluate neurological toxicity.

     -  Studies of the reproductive effects of hazardous  air  pollutants  on male
        animals, and   studies  of  the  developmental  effects  of  hazardous  air
        pollutants on  fetuses, neonates, adults  and   geriatric animals are being
        conducted to   assess  teratogenicity  and  other  developmental  effects.

     -  Research on the metabolism of  hazardous  materials  and  the susceptibility
        of animals to  Infectious respiratory disease  is being conducted to evalu-
        ate the respiratory and immunological  effects.

1983 Program Request                       ;

     The Agency  requests  a   total  of  $2,341,900  and  21.1  permanent  workyears
for this program, of which $1,476,100 1s for Salaries and Expenses and
3865,800 1s for  Research  and Development.   This reflects  an Increase  of $61,200
and a  decrease of  $426,500, respectively.   This net  decrease  results  from  a
decision to  reduce support   for  research  on  carcinogenicity  and  mutagenicity,
since the health  effects  data bases  for these two endpoints  are more extensive
                                      A-39

-------
than data bases for other endpoints such as teratogenldty, reproductive effects.
and behavioral effects.                  ?

     To Identify and  screen  for hazardous air  pollutants,  microbiological  assay
techniques will continue  to  be  developed  and  validated  to sample and  test for
the presence of mutagens 1n ambient air.

     Human and rat studies of toluene will  be Initiated to provide a broad-based,
Integrated framework  for  research  on this solvent.   The effects of  chronic and
acute exposure to  toluene  on the behavior, morphology  and biochemistry  of rats
will be  assessed.   This  research  builds  on  neurological  and  biochemical  data
acquired In earlier animal studies.  The effects  of acute exposure to toluene on
the behavior and physiology of humans will  be assessed.  Acute exposure of humans
to toluene poses no significant, Irreversible health risks.  This research, which
will provide a comparison  of animal  and human data, and aid 1n the extrapolation
of data  from  animal  models  to  human health  effects,  will allow  researchers to
predict the effect of chronic exposure of pollutants on humans.

     Animal studies of the neurobehavioral  effects of alky 1 tins will  be expanded
to assess  visual  evoked  potential.   The  visual  evoked  potential,  which  1s an
electrophyslological  measure  of nerve  function  and therefore  an Indicator of
health effects,  was   developed   by  the  Health  Effects  Research  Laboratory  at
Research Triangle Park as  a  model  test system  to pinpoint'the type and location
of neurological damage.

     Research on age-related  biological  phenomena will be initiated.  The research
will focus  on  the neonate,  which  1s a  highly susceptible organism.   Hazardous
air pollutants  such  as nickel,  cadmium and  vanadium  will  be tested  for  their
developmental effects.  The  research  will examine the  applicability  of  these
effects to other species  such as the hamster.   The  data gathered will contribute
to eventual application of multlspecies animal data to human effects.

     Inhalation studies will  be continued to  test  immune system  defense  mech-
anisms.  Approximately  four  new  compounds,   chosen in  conjunction with  OAQPS,
will be screened.

ENVIRONMENTAL EHGINEERIM6 AND TECHjlONLOGY

1981 Accomplishments

     In 1981,  the  Agency used  a total   of $644,900 for  this program,  of  which
$189,400 was under the  Salaries and Expenses appropriation and  $455,500 was for
extramural purposes under the Research and Development appropriation.

     In 1981,  emphasis  was  placed  on  collecting emission data  and  evaluating
control techologles to  assist OAQPS in the  review  and development  of National
Emission Standards for Hazardous Air Pollutants (NESHAPs).

     Emission data needed  by OAQPs  were  developed  for  several  industrial  pro-
cesses, Including  drum-mix  asphalt  plants,   metal  degreasing  operations  and
synthetic organic chemical plants.  General design  parameters were developed for
several types  of  control  technologies  for volatile  organic compounds  (VOC) such
as capture systems, catalytic oxidation and carbon adsorption.  Carbon adsorption
controls for  petroleum solvent dry  cleaning  operations  and  organic  chemical
plants were assessed, as were controls for metal degreasing operations.

198ZExplanafionof Changes from January Budget Estimate


                   January        March          Current
                  Estimate       Estimate       Estimate

                  $817,200       $788,300       $772,800
                                     A-40

-------
     The net  decrease  of  -$44,400  results  from  several  actions,  as  follows:

     -  January - March.   (-$28,900)   This  change  represented  a  decrease  of
     S28,9dO fromthe  January  budget,  of  which  $6,300  was  for  Salaries  and
     Expenses and $22,600 was for Research and Development.

     -  Congressional Actions.  (-$15,500)   An additional  reduction  of -$15,500
     was applied to the Salaries and Expenses ($6,000)  and Research  and Develop-
     ment ($9,500) appropriations to meet  Congressionally mandated appropriation
     levels.

     -  Transfer Authority.  (No Change)  The net change applied to this activity
     1s raaae up  or  a decrease of  -$56,600 from Research and Development  and an
     Increase of +$56,600 to  Salaries  and  Expenses.  The Increase will  allow lab
     program reviews, monitoring of extramural projects, as well as  the conduct
     of more program evaluation studies.

1982 Program

     In 1982, the  Agency  1s  allocating a  total  of $772,800  and 3.6  permanent
workyears to this program,  of which $276,900  1s under  the  Salaries and Expenses
appropriation and  $495,900 1s  for  extramural  purposes  under  the  Research  and
Development appropriation.

     In 1982, emphasis  1s continuing  to be  placed  on  collecting emission  data
and evaluating control technologies to assist OAQPS 1n  the review and development
of NESHAPs.

    - An evaluation of the effectiveness of catalytic oxidation 1n controlling VOC
emissions 1s being  conducted.  Field  tests  for  catalytic Incinerators will  be
completed.  Measurements of  emissions from a  ferroalloy  production facility are
being taken, and a demonstration and evaluation of a technology to control emis-
sions will be conducted.

1983Program Request

     The research  In this  program  was  transferred to the Oxldants  Non-Energy
program 1n 1983.

JMVIROHMEHTAL PROCESSES AND EFFECTS

1981 Accomplishments

     In 1981, the Agency  used a total  of  $1,044,400 for this program,  of which
$309,000 was under the  Salaries  and Expenses  appropriation and  $735,400 was for
extramural purposes under the Research and Development appropriation.

     The 1981 program was  designed to provide  OAQPS with  data  on the transport
and fate of pollutants  emitted from stationary sources.  These data  were used to
Identify and screen for hazardous air pollutants and to develop risk  assessments.

     Urban atmospheres  In  the Pittsburgh,  New York City,  and Chicago  areas were
sampled and  characterized  for  their  trace  level  concentrations of more  than
40 volatile organic compounds (VOCs).

     Data on 151 VOCs which  were  observed 1n the ambient  air were assembled and
critically evaluated  as an Initial  step 1n  assessing  the current knowledge of
concentrations of trace organics In ambient air.

     Transformation reaction  studies were  Initiated on  formaldehyde,  acrylonl-
trile, vinylldene chloride,  tHchlorethylene, allyl chloride,  aeetaldehyde, and
acroleln.  These  studies  provide  Input to decision-makers  for the listing  of
hazardous air pollutants.
                                    A-41

-------
1982Explanation of Changes fromJanuaryBudget Estimate

                   January        March          Current
                  Estimate       Estimate       Estimate

                $1,558,900,     $1,556,300     $1,379,000

     The net decrease  of  -$179,900  results  from several  actions,  as  follows:

     -  January - March.  (-$2,600)   This change represented a decrease of $2,600
     from the January budget, for Salaries and Expenses.

     -  Congressional Actions.  {-$77,300)  An  additional  reduction of -$77,300
     was applied to the Salaries and Expenses appropriation to meet Congressional -
     ly mandated appropriation levels.

     "  Transfer Authority.  (-$100,000)  The  net change applied to this activity
     1s made up of a  decrease of -$127,000 from Research and Development and an In-
     crease of +$27,000 to Salaries and Expenses.  The Increase will be used to pay
     for gasoline to be used 1n  the  laboratory's  Government Vehicles  for local
     travel at RTP and  on  selected  trips where vehicles are  needed  to transport
     equipment.

1982J>rqgrani

     In 1982, the Agency  Is allocating a  total  of $1,379,000 and 6.0 permanent
workyears to this program,  of which  $346,500  1s under the Salaries  and Expenses
appropriation and $1,032,500  is  for extramural purposes  under the  Research  and
Development appropriation.

     The 1982  program  continues  to  provide  OAQPS  with  data  on the  transport
and fate of  pollutants  emitted  from  stationary sources.  This  Information  will
be used to identify  and screen for  hazardous air  pollutants  and to  develop  risk
assessments.

     Reaction rate and  product formation  studies  are  being  expanded  to include
five additional hazardous air pollutants.

     The rate  of  physical  loss from the  atmosphere  of long-lived hazardous  air
pollutants is  being  measured.  The  physical  loss pathways  for which   rates  are
being determined include dry deposition and wet removal.

     Tropospheric photolytlc  decomposition  rates  and  products are  being  deter-
mined for selected hazardous air pollutants.

     Characterization of hazardous air pollutants in  urban and rural  air 1s being
continued 1n  an  effort to  map  natural,  spatial  and  temporal  variabilities.

     Transport and transformation relationships between hazardous  air pollutant
emission sources and local  ambient  air quality are  being tested  via field samp-
ling and mathematical modeling.

1983 Program Request

     The Agency  requests  a  total  of $814,600  and  3.9  permanent workyears  for
this program, of  which  $316,600  1s for  Salaries and  Expenses and $498,000 is for
Research and Development.   This  reflects  a  decrease  of  $29,900 and $534,500,
respectively.  This  decrease  results  from a  decision  to  reduce  emphasis  on:
(1) providing  atmospheric   and  source  measurements  of  selected hazardous  air
pollutants; (2) developing source apportionment models; and (3) assessing
the atmospheric  chemistry,  lifetime  and  deposition of  selected hazardous  air
                                    A-42

-------
pollutants.  This deserease 1s due to a reduced regulatory program  need for this
work 1n 1983.

     The following research  will  be conducted  to help  Identify and  screen for
hazardous air pollutants and to develop risk assessments:

     -  Predictive structure/activity models  will  be used to  screen  high volume
        pollutants for hazardous secondary products.

     -  Atmospheric screening  studies  to characterize the distribution and con-
        centration ranges of  trace hazardous air  pollutants will  be continued.

     -  Tropospherlc  reaction  rates and  products  wfll  be  determined  for addi-
        tional volatile organic compounds.  These  compounds  will to be chosen In
        conjunction with OAQPS.   Dry deposition and  wet removal processes will
        be characterized for additional  species  with long atmospheric persistence
        times.
                                      A-43

-------
                                                 AIR

                                      Mobile Sources Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
PROGRAM
                                          (DOLLARS IN THOUSANDS)
Scientific Assessment
 Salaries 4 Expenses
 Research 4 Development

Technical Information
A Liaison
 Salaries A Expenses
 Research A Development

Monitoring Systems A
Quality Assurance
 Salaries 4 Expenses
 Research 4 Development

Health Effects
 Salaries A Expenses
 Research It Development

Envl rontnental
Processes A Effects
 Sal arles A Expenses
 Research 4 Development

TOTAL:
 Salaries A Expenses
   $72.2
    $3.4
$65.9
 $3.4
$65.9
 $3.4
                                    $44.8      $50.2      $5.4
                                               $25.0^   $25.0
$35.5      $21.0    -$14.5
  $605.7     $907.0     $901.4     $706.9     $664.4    -$42.5
   $44.0     $67-2.4     $659.0     $537.3   $1,039.7 x  $502.4
$2,852.5   $2,172.7   $2,160.9   $1,645.6     $816.4   -$829.2
$2,475.4     $779.1     $757.1   $1,098.0     $552.0^ -$546.0
  $524.0     $680.2     $677.0     $599.0     $482.6   -$116.4
  $368.7   $1,028.5   $1,028.5     $928.5     $825.2" -$103.3
$4,054.4   $3,825.8   $3,805.2   $3,031.8   $2,034.6   -$997.2

-------
                                                 AIR
                                      Mobile Sources Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
(DOLLARS IN
Research S Development
Mobile Sources Non- TOTAL
Energy
PERMANENT FULL-TIME WORKYEARS
Scientific Assessment
Technical Information
& Liaison
Monitoring Systems 4
Quality Assurance
Health Effects
Env1 ronmental
$2,891.5
$6,945.9

1.7
10.6
32.4
11.5
$2,483.4
$6,309.2

1.6
12.9
9.0
11.2
THOUSANDS)
$2,448.0
$6.253.2

1.6
12.9
9.0
11.2

$2,563,8
$5,595.6
.5
1.0
10.9
9.7
9.2

$2,441.9 -$121.9
$4,476,5 -$1,119.1
1.0 .5
-1.0
7.0 -3.9
7.7 -2.0
6.2 -3.0
Processes 4 Effects
TOTAL PERMANENT HORKYEARS
56.2
34.7
34.7
31.3
21.9
-9.4

-------
                                                 AIR

                                      Mobile Sources Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
TOTAL KORKYEARS
Scientific Assessment
Technical Information
3» 1 Liaison
*»
*" Monitoring Systems I
Quality Assurance
Health Effects
Environmental
'
.5
1.9 2.1 2.1 1.5


13.4 18.1 18.1 15.1

46.8 19.8 19.8 13.4
12.5 12,8 12.8 18.5

1.0
.1


11.0

11.4
12.2

.5
-1.4


-4.1

-2.0
-6.3
Processes 8 Effects
TOTAL WORKYEARS
74.6
52.8
52.8
49.0
35.7     -13.3

-------
                                       AIR

                            Mobile Sources Non-Energy
Budget Request
     The Agency requests  a  total  of $4,476,500 and  21. 9  permanent workyears for
1983, a decrease  of $1, 119,100 and 9.4 permanent  workyears  from 1982.  Included
in this total is $2,034,600 for Salaries and Expenses and $2,441,900 for Research
and Development,  with decreases  of  $997,200 and  $121,900,  respectively.   The
decrease is  a result of  a reduction in health  research  for diesel particle risk
assessments due to a completion of much of the work under that program.

Program Dejcrjptlon

     The overall  program  provides the  data base  necessary to  estimate adverse
effects on  human  health  associated with  airborne pollutants  which  are produced
by mobile  sources (fuels,  fuel   additives,  combustion products  and atmospheric
transformation products derived therefrom).   The  program also  provides  EPA with
a scientifically  defensible data base  on  vehicular  emissions  to   support and
evaluate mobile  source  standard  setting  processes  and  abatement  strategies.
Studies determine impacts of motor  vehicle advanced  control  systems and advanced
power systems on  both  regulated and important non-regulated pollutant emissions.

     The activities  in this program  also:   determine human  exposure  to mobile
source pollutants  by  developing  and  applying  monitoring  equipment  and  metho-
dologies; determine mobile  source contributions to  ambient  air quality by long-
term monitoring;  develop  methods to  collect exhaust  for chemical  analysis and
mutagenic testing;  register  fuel  and  fuel  additives In accordance  with Section
211 of the  Clean Air  Act;  provide  all  necessary  quality  assurance  for mobile
source needs; and provide  fuels  analysis  for Regional  and  enforcement  needs.
1981 Accompl 1 shments

     There were no resources requested for this program in 1981.

1982 Explanation of Changes from January Budget Estimate

                       January       March       Current
                      E_stiiitate     Estimate     Estimate

                                                 $44,800

     The net increase of +$44,800 results from the following action:

     '  Reprpgranini'ing.  (-t-$44,8.00)   During  the  development  of  the  operating
     pi an, several mi seel 1 aneous reprograimnlngs, which are not reportable
     to Congress,  were  made  to this  activity and  resulted  in a  net increase
     of +$44.800,

1982 Program

     In 1982,  the Agency  is  allocating  a  total   of  $44,800  and  .5  permanent
workyears to  this program,  all  of which  is  under the  Salaries  and Expenses
appropriation.

     The primary focus of this program is to determine  the actual risk to humans
of exposure  to diesel  exhaust.  This  information  is needed  by  EPA's  Office of
Mobile Source  Air  Pollution  Control  (OMSAPC) to carry  out its mandate under the
Clean Air  Act  to  protect   the public  health  from  motor  vehicle  emissions.
                                    A-47

-------
     Since diesel  exhaust and  coke  oven emissions  contain  chemically  similar
constituents, a preliminary assessment of the carcinogenic risk of diesel  exhaust
is being done using epldemiologic data on coke  oven workers and exposure  data on
diesel exhaust.   An analysis  of an  epidemiology  study of  transit workers  in
London, England  exposed  to diesel  emissions 1s  also  being done.   Exposure and
animal testing  data currently  being developed by  the Office  of  Research and
Development (ORD)  Diesel  Research   Program  will   provide  important  additional
Information on the  carcinogenic potential of diesel  exhaust.   In  1983  the data
will be assessed to provide revised population risk estimates.

1983 Program Request

     The Agency  requests  a total  of $75,200 and  1.0  permanent workyear for this
program, of which $50,200 is for Salaries  and Expenses  and $25,000  is for Research
and Development.  This increase  of  $5,400 and $25,000  respectively, reflects the
need to acquire expert consultative services to support the final risk assessment
task.

     Human risk assessments for diesel exhaust based on exposure and animal  testing
data from the Mobile Source Research Program will be completed.  These assessments
will be  completed  following  selection  of  the  most  appropriate  data for risk
assessment, extensive review of the data for completeness  and accuracy,  and the
application of various  statistical   techniques  to develop  estimates of  risk to
human populations.  .Such  assessments  will make  maximum use  of the diesel  program
experimental data in evaluating the  Impact of emissions from current and projected
numbers of diesel vehicles.

     The guidelines currently being developed by ORD for applying a tier bfoassay
to unregulated emissions will be reviewed  for conformance with Agency risk assess-
ment guidelines and will  be peer reviewed by experts In  each  of  the chronic effects
area.

TECHNICAL INFORMATION AMD LIAISON

     Refer to the Oxidants Non-Energy narrative for a description of those Tech-
nical Information  and  Liaison  activities that  are common  to all  research and
development budget sub-activities.  Activities specific to this budget sub-activ-
ity are indicated in the program element description below.

1981 Accomplishments

     In 1981,  the Agency  used a total  of  $75,600  for this  program, of  which
$72,200 was  under the  Salaries and  Expenses appropriation and  $3,400 was for
extramural purposes under the Research and Development appropriation.

     The following technical information products were made available:

     -  Proceedings:  International  Symposium on Health Effects of Diesel Etrenis-
        sions

     -  Project  Report:    Exhaust  Emission  Patterns  from Two Light-Duty Diesel
        Automobi1es

     -  Book  Article:   Bacterial  Mutagenesls  and   the  Evaluation  of  Mobile
        Source Emissions

     -  Project  Report:    Effects   of 2%  Venous  Carboxy-Hemoglobin  on  Exercise
        Induced Angina Pectoris

     -  Research  Report:   Possible Approaches  to the Health  Effects  Testing of
        Fuels and Fuel Additives
                                     A-48

-------
1982Explanation of Changes from JanuaryBudget Estimate
                       January       March       Current
                      Estimate     Estimate     Estimate
                       $69,300      $69,300      $35,500
     The net  decrease  of  -533,800  results from  several  actions,  as  follows:
     -  Congressional  Actions.  (-$33,800)  An reduction  of  -$33,800  was applied
     to the Salaries and Expenses  appropriation  to  meet Congress!onally mandated
     appropriation levels.
     -  Transfer Authority.  (Mo Change)  The net change applied to this activity
     is made up ofa decrease of ~$3,4DO from Research and Development and an in-
     crease of +$3,400 to Salaries and Expenses for  necessary operating expenses.
1982 Program
     In 1982,  the  Agency  1s allocating  a total  of $35,500  and 1.0  permanent
woricyear to  this  program,  all   of  which is  under  the  Salaries  and  Expenses
appropriation.
     The following products are planned:
     -  Journal Publication:   Monitoring  of  Work  Place  Atmosphere  for  Diesel
        Exhaust Components from Ongoing Emission Studies
     -  Project Report:   A Review  of EPA  Cincinnati's Diesel  Emissions  Health
        Effects Program
     -  Book Article:  Genotoxic  Effects of Diesel  Exhaust  Emissions  In Labora-
        tory Animals
     -  Book Article:   Mutagenic Activity of Diesel  Emissions
     -  Journal Publication:   The  Effect  of  Oxidant  Air  Pollutants   on  Human
        Resistance to Viral Infection of the Respiratory Tract
     -  User's Guide for a Commuter Exposure Model
     -  Problem Oriented Report:  Report to Congress - 0.4 Gram/Mile NOX Emission
        Standard
1983 Program Request
     The Agency requests a total  of $21,000 and no  permanent workyears for this
program, all  of  which is  for Salaries and Expenses.  This  reflects  a  total  de-
crease of  $14,500,  resulting from  a decision to decrease the  amount  of direct
technical Information and liaison support provided.
     In 1983, the Technical Information and Liaison  program will stress providing
the necessary technical  information to State  and local  officials In support  of
their Increased role in administering envirorimental  programs.
HONITQRIKG SYSTEMS AMDQUALITYASSURANCE
1981 Accomplishments
     In 1981,  the  Agency  used  a  total  of $649,700  for  this program,  of  which
$605,700 was  under  the Salaries and Expenses  appropriation and $44,000  was  for
extramural purposes under the Research and Development appropriation.
                                    A-49

-------
     Current mobile source emission  standards  for carbon monoxide, hydrocarbons,
and nitrogen oxides have been established  by  Congress,  considering technological
and economic feasibility.  In  order to determine whether these  standards adequ-
ately protect human health,  1t 1s necessary  to  have an accurate picture  of the
levels of automotive pollutants to which people are exposed.  It 1s also necessary
to know the exposure-reponse  relationship  for the given exposure  pattern.  This
Issue takes on  added  significance In  light  of the projection that  total  mobile
source emissions are likely to Increase after 1990.

     To respond to this problem, ORD began conducting a major  study to determine
actual human exposures  to  carbon  monoxide (CO).   Carbon  monoxide  was  selected
because 1t 1s emitted almost exclusively from mobile  sources,  and  concentrations
vary greatly as  a  function   of location.   The   project  makes  use  of  personal
monitors to measure the concentrations of CO to which  subjects are  exposed  at
different times  and  locations.   Human  activity  profiles  were  developed  for
selected cities  to determine  where and  when the  overall  population would  be
exposed to CO.

     To assess how levels of other motor vehicle  pollutants  vary as  functions  of
time and location, similar field experiments  using personal  monitors are planned.
The human activity profiles developed  1n  the CD  study  should  provide  a  tool  for
estimating exposure to  other  airborne  pollutants, including dlesel participates.

     The following accomplishments were made  in 1981:

     -  A  pilot  study  to  determine  direct  human  exposures  to  carbon  monox-
        ide (CO) was completed In Los Angeles using personal  exposure
        monitors, providing  the  Agency's  first  exposure  profiles  of  members
        of the general  public.

     -  A  sol Id-state  data   logger-integrator  for  the  new  personal  monitors
        was developed to enable the average CO exposure to be computed
        accurately and conveniently.

     -  CO exposures of occupants of motor vehicles were monitored  in
        detail  on an urban arterial highway in California.

     -  A  field  study  of the  CO exposures  In  commercial  settings  and  selected
        microenvironments In four California  cities was completed.

     -  Studies  of  the  wintertime  CO  concentrations In  four  United  States
        cities were completed.

     -  Over 300 fuels and fuel additives  were registered.

     -  Analytical support was  provided to:   The Office of  Air  Quality  Planning
        and Standards  for  equipment  calibration;  the  Office   of  Enforcement
        on the  actual   use  of  lead,  phosphorus  and  manganese  in  fuels;  and
        to the Office of Health Research  in  the provision of  ambient  CO samples
        for effects testing.

1982 Explanation of Changes from January Budget Estimate
                       January
                      Estimate
  March
Estimate
 Current
Estimate
                    $1,579,400   $1,560,400   $1,244,200

     The net decrease  of  -$335,200  results  from several  actions, as  follows:

                - March.   (-$19,000)    This   change  represented  a  decrease  of
                                                   '
     $1 9 ,tiQO from  the J anuary  budget,  of  which  '$5,600  was  for  Salaries  and
                                     A-50

-------
     Expenses and  $13,400  was  for  Research  and  Development.   This  decrease
     resulted in  a slightly  reduced level  of  support  to  analyze and  monitor
     mobile source pollutants.

     -  Congressional, Actions.  (-$281,200)  A reduction of -$281,200 was applied
     to the  Sal aries  and  Fxpenses  ($244,500)  and  Research  and  Development
     ($36,700) appropriations  to  meet  Congressional ly  mandated  appropriation
     levels.

     -  Transfer Authpri ty .  (-$35,000)  The  net change  applied to this activity
     is made up  of a decrease of  -$85,000 from Research and  Development and an
     increase of  +$50,000  to Salaries and Expenses.   The increase  will  support
     major in-house projects  of the  lab;  maintenance and  repair  of  analytical
     instruments and  computer equipment;  rentals  of office equipment;  building
     maintenance; and to fund the purchase of gases and CO monitors.
     In 1982, the  Agency  1s  allocating  a total  $1,244,200  and  10.9  permanent
workyears to this program,  of which $706,900 is under the  Salaries  and Expenses
appropriation and $537,300 is  for extramural  purposes  under  the  Research  and
Development appropriation.

     In the carbon monoxide exposure  assessment program,  emphasis is moving from
the pilot  stage to  the  field  survey  design  phase,  and to deploying personal
monitors in large-scale surveys.  An urban-scale survey will  provide needed data
on exposure  profiles  of  the  urban  populations.  Data  from  these   studies  are
being analyzed for application to predictive exposure  models, providing exposure
estimates required by the Office of Mobile Source Air Pollution Control  to assess
the Impact of emission  standards.   These estimates  may provide cost savings  by
showing that emission standards are too stringent.

     The fuel and fuel  additive program,  mandated by  Congress,  1s  continuing.

     Analytical  support will  be provided to:   (1)  the  Office  of   Air  Quality
Planning and Standards for laboratory equipment calibration; (2) the Mobile Source
Enforcement Division  for  information  on  fuel  types; and (3) the Health  Effects
Research Laboratory  in Research Triangle Park (RTP) for support of a seven cities
health study.

1983 Program Request

     The Agency requests  a total  of $1,704,100 and  7.0 permanent workyears  for
this program, of  which  $664.400 is for Salaries and Expenses  and $1,039,700  1s
for Research and Development.   This reflects a decrease of $42,500 and an increase
of $502,400, respectively.  The net increase represents a  shift in emphasis from
the pilot phase of  the  urban  scale  studies to the  field study  phase, which  Is
largely extramural in nature.

     The monitoring   program in  1983  1s  directly   supporting  regulatory  reform
goals by assessing  actual human exposures  to CO.   The  ultimate  effect  of this
research may  well  be  the  relaxation  of the  NAAQS for  CO,  which   will  reduce
the burden on automobile manufacturers to control  CO.

     -  The carbon monoxide exposure assessment program will  continue to  collect
        data in urban-scale field  studies for  determining  population  exposure
        frequency distributions.  Emphasis will shift  to  analysis of the  data in
        combination  with human activity patterns in  order to  estimate the Impact
        of alternative emission standards on human  exposures.

     -  Fuel and fuel additive registration, as mandated by Congress,
        will continue.
                                   A-51

-------
     -  Chemical' analytical   support will  continue  to  be  provided to  Agency
        laboratories and Regional and program offices.

HEALTH EFFECTS

1981 Accomplishments

     In 1981,  the  Agency used  a  total  of  $5,327.900  for  this   program,  of
which $2,852,500 was under the Salaries and Expenses appropriation and $2,475,400
was for  extramural  purposes  under the  Research  and  Development appropriation.

     The primary  focus  of this  program  1n  1981  1s  the  concern  over  the  risk
to human health  that 1s  posed  by dlesel emissions.   The reasons for  this  are:
1) dlesel  emissions  are  similar  chemically  to  other  fossil  fuel  combustion
products, some  of which  are known  to  be carcinogenic;  2) dlesel  engines  emit
30 to  100   times the  particle  matter  emitted  by  comparably  sized  gasoline
engines; 3)  these particles  are  of resplrable  size; and  4)  the production  of
diesel vehicles  Is projected to  rise rapidly through  the 1990's.  The secondary
focus will   be  to supply  Information needed  to  support  the  revision of  the CO
standard.

     Research to  determine   whether  exposure  to  vehicle  exhaust  emissions  1s
hazardous to human health produced the following results:

     -  Skin  tumor  Initiation  studies  Indicated  that  extracts  from  dlesel
        emissions vary as  to the  stimulation of a response  over a  range  from
        Inactive to  that  comparable  to  roofing  tar  extracts  (which are known
        carcinogens).

     -  Biologically  active  amounts  of  mutagenlc  compounds  were  found to  be
        extractable from dlesel  particles by biological fluids.

     -  Oxygenated poly nuclear  aromatlcs and  nltroaromatlcs  were Identified as
        being reponslble  for much of the biological  activity  detected  In frac-
        tloned extracts from diesel particles using In vitro assays.   .

     -  New Instrumentation 1s needed before  further  carbon monoxide (CO) clini-
        cal studies can be conducted  on cardiovascular dysfunction, was developed,
        tested, and found to be acceptable.

     -  Mutagenlc assays  of extracts  of ambient  particles  were collected  In
        proximity to  and  Inside  the Hew  York Port  Authority  Bus  Terminal  and
        the fraction tested  for biological activity;  however, the  results  were
        Inconclusive.

1992 Explanation of Changesfrom January Budget Estimate

                       January       March       Current
                      Estimate     Estimate     Estimate

                    $2,951,800   $2,918,000   $2,743,600

     The net decrease  of -$208,200  results  from  several  actions,   as  follows:

     ~  January - March.   (-$33,800)   This   change  represented  a  decrease  of
     $33,800 from the January  budget,   of  which $11,800 was  for Salaries  and
     Expenses and $22,000 was for Research and Development.

     "  Reprogratiinlng.   (+$1,110,000)   This  transfer  of  resources  from  the
     oxldants prograi  to the  mobile  sources  program  consolidates  all  carbon
                                     A-52

-------
     monoxide research activities  under the mobile  sources  research  committee.
     The effect  of  the  transfer  1s  for  consolidation  purposes  only and  does
     not affect  any  planned research.   This  transferring of  planning responsi-
     bility has  already  been Implemented  by the  research  committees Involved.

     -  Congressional  Actions.    (-$1,319,400)    A  reduction  of  -$367,100  was
     taken against the March estimate  reflecting the September  12*  reduction to
     the Research  and Development  appropriation.  An  additional  reduction  of
     -$952,300 was  applied  to  the Salaries and  Expenses appropriation  to  meet
     Congressionally mandated appropriation levels.

     -  Transfer Authority.  (+$35,000)  The  net change applied  to this activity
     Is made up  of  an increase  to Salaries and Expenses  for essential operating
     costs.

1982 Program

     In 1982, the Agency 1s allocating  a  total  of $2,743,600 and 9.7 permanent
workyears to this program, of which $1,645,600 1s under the Salaries and Expenses
appropriation and $1,098,000 is  for extramural purposes  under the  Research and
Development appropriation.

     In 1982, while the  diesel  work continues to  be  a major effort, the primary
focus will  be  on providing the  latest  health  effects   Information   needed  to
evaluate the ambient  air quality  and  motor vehicle  emission standards  for CO.
Air quality  standards are  established  for  carbon  monoxide  at  a  level  which
protects public  health,  based   on effects  observed  In human  beings  exposed to
high levels  of   CO  for a short  period of  time.   At the  present time there 1s
insufficient data to  determine  the  adverse health  effects, 1f  any,  associated
with long term,  low-level exposures  to CO.  The  availability  of  such data  will
be needed in performing the next update of the CO criteria document.

     The mobile  sources health research program,  currently 1s divided  Into three
research areas:   carbon  monoxide  toxicology,   dlesel  particle  cardnogenicity,
and bioassay  development.   Examples  of  research  supportive  of  these  areas
follows:

     -  The additional data necessary  for  an Improved estimate  of risk of expo-
        sure to  carbon monoxide  1s being  obtained through controlled  laboratory
        studies  In  human volunteers.    We are  evaluating  the  cardlopulmonary
        effects  in both normal  subjects and those who suffer from coronary artery
        disease when exposed to levels of CO which  produce 2-4% carboxy hemoglobin
        (COHB).  Impairment of cardiac  function is being evaluated through meas-
        ures such as   blood  volume  ejection fraction,  heart  wall  motion,  and
        pressure changes.  Reductions  In the duration  of exercise  prior to the
        onset of heart pain  (angina)  are also being  considered.   Animal  studies
        are being conducted  to  ascertain the effects of  chronic  CO exposure on
        cardiovascular and  central  nervous system  development  In  fetuses and
        newborn offspring.

     -  The carcinogenic  potency of particle bound  organic;  is  being evaluated
        utlizing Intratracheal   instillations  in  hamsters  and  dermal  exposure
        of mice.  In  addition, the ir± vivo distribution,  metabolism and carcino-
        genic potential  of  nltroaromatlcs  is  being  studied since  these agents
        appear to account  for  a  significant portion  of  the  mutagenic activity
        observed in dlesel particle bound organics.

     -  The  biological  activity  of fractions  of unregulated organic emissions
        (gaseous and  particle bound components)  resulting  from combustion  of a
        variety of  fuels  is being evaluated using in vitro  bioassays to detect
        gene mutations.  ONA  damage, chromosomal  effects,  oncogenic transforma-
        tions and cellular toxldty.
                                    A-53

-------
1983 Program Request

     The Agency requests  a total  of $1,368,400 and  7.7 permanent workyears  for
this program, of which 5816,400 Is  for  Salaries and  Expenses and $552,000 1s  for
Research and  Development.   This  reflects a  decrease  of  $829,200 and  $546,000
respectively, which results from:

     -  Completion of the health research  In  supporting the dlesel particle risk
        assessment program;

     -  The  formation  of the Health Effects  Institute, a  research arm  designed
        to study  mobile   source  pollutants  which is  anticipated  will  provide
        additional  mobile source research; and,

     -  The  phase-out  of  efforts  to   develop   short-term  bioassay  protocols
        for the  fuel  and  fuel   additive and unregulated  emissions  programs.

     The objectives of the 1983 mobile sources research plan are to:

     -  Provide the  additional data necessary for revaluation  of the estimates
        of risk to public health from both acute  and chronic exposures to carbon
        monoxide.  This will be accomplished  through  continued experiments relat-
        ing CO exposure  to  carboxyhemo-globln (COHb)  levels  in human  volunteers.
        COHb has  been  linked to  heart  disease in  a number  of  clinical  health
        studies, but  the  relationships  between  specific  levels  of  COHb  and
        Impaired cardiac functioning have  not been validated.  Research  on this
        subject should provide information  needed for  the  next  revision  of  the
        CO criteria  document and   the  revision  of  the  current  CO  standard.

     -  Complete the additional data  necessary to accurately  determine  the car-
        cinogenic potency  of  diesel   particles   relative  to  cigarette  smoke,
        roofing tar fumes and coke oven  emissions.

     -  Conclude  the development  of short-term  bioassay  protocols   useful  for
        evaluating the carcinogenic,  mutagenic and  cytotoxic potential  of fuel
        and fuel additives and unregulated emissions  from mobile sources.

              PROCESSES AMD EFFECTS
1981 Accomplishments

     In 1981, the  Agency used  a total  of  $892,700 for  this program,  of which
3524,000 was under  the  Salaries and Expenses appropriation and  $368,700 was for
extramural purposes under the Research and Development appropriation.

     the research activities were as follows:

     -  A number of filter media were tested and evaluated for collecting dlesel
        participate emissions.  The purpose of this study  was to identify a fil-
        ter medium that could be used as an alternative to the method recommended
        in the  dlesel  regulations  for  parti cul ate  emissions.   This  gives  the
        manufacturers a  greater degree of flexibility in  the collection of data
        required by EPA.

     -  The  degree to  which NOg  emissions produce  a mutagenlc effect  in the
        diesel  parti cul ate samples was determined.  The purpose of this study was
        to minimize the  formation  of dlesel parti cul ate mutagens as an artifact
        of the collection and analytical procedure.

     -  Gaseous  and parti cul ate  emissions   were  identified  and  quantified for
        light duty  diesel  and  gasoline  powered  vehicles.   Exhaust  samples were
        also tested for biological activity based on the same test.
                                     A-54

-------
     -  A sample of oil  shale distillate was tested as a diesel  fuel.  The emis-
        sion characterization  results   showed that  this  fuel  sample  produced
        emissions characteristic of a good diesel  fuel.

     -  The emission from a vehicle equipped with  a three-way catalyst was deter-
        mined during driving conditions.  The result showed that ambient tempera-
        ture had a marked effect on the carbon monoxide emission.  This Indicates
        that auto emissions vary depending  upon  conditions  such  as temperature,
        and that these  conditions  must be taken  into  account in the  setting  or
        revision of standards,

T.982JExfilAMtlojlJpf Changes from January Budget Estimate

                       January       March      Current
                      Estimate .   Estimate     Estimate

                    $1,708.700   $1,705,500   $1,527,500

     The net decrease  of  -$181,200  results  from several  actions,  as  follows:

     -  January - March.  (-$3,200)  This change represented a decrease of $3,200
     from the January budget for Salaries and Expenses.

     -  Congressional  Actions.  (-$78,000)   An  additional  reduction  of -$78,000
     was 'applied to the Salaries and Expenses appropriation to meet Congress! onal-
     ly mandated appropriation levels.

     -  Transfer Authority. (-$100,000)  The net  change  applied  to this activity
     is made up of  an  decrease to Research and Development for essential operating
     costs in the Salaries and Expenses appropriation.

1982 Program

     In 1982, the  Agency 1s  allocating  a  total  of $1,527,500 and 9.2 permanent
workyears to this  program,  of which  $599,000 is  under the  Salaries and Expenses
appropriation and  $928,500 is  for extramural  purposes  under  the Research  and
Development appropriation.

     An increasing focus in 1982 is characterizing emissions from In-use vehicles.
The work on 1n-use vehicles is primarily motivated by the Agency's current mobile
regulatory reform development plan  to emphasize In-use rather than premanufactur-
ing certification testing  procedures.   The  1n-use characterization program will
provide realistic emission data that can be  used  to predict air quality Impacts.

     -  The diesel  emission characterization program 1s  focusing on 1n-use heavy
        duty diesel and  gasoline trucks and  buses.   Both gaseous and paniculate
        emissions are being  measured under  a  variety of  driving  conditions  to
        obtain accurate  emission  factors  for the heavy  duty vehicle  category.
        Previous work suggests  that research is needed to  obtain realistic emis-
        sions data  from actual  1n-use heavy  duty vehicles  rather  than  engine
        dynamometer data which is currently being  used.

        In order to assess the impact of new fuels, including synfuels, a con-
        tinuing research program  is investigating  motor  vehicle  regulated  and
        unregulated emissions resulting from  the  use of these fuels.  In parti-
        cular, two  fuels  are  being  studied  during  this  period; methanol  and
        M-gas (a methanol-derived fuel).

        The emissions of specific volatile organic compounds (VOC's), including
        aldehydes from  1n-use light  duty vehicles with  and without  control  de-
        vices, are being determined.  This work addresses the concern that mobile
        sources may contribute  more  reactive VOC's, which  are  important precur-
                                    A-55

-------
        sors to ozone  formation  in the atmosphere, than the  current inventories
        would suggest.  In addition  to VOC data, carbon monoxide  emissions data
        are being obtained and compared to estimates predicted by current emis-
        sions inventory techniques.  It is anticipated that these emissions data,
        which reflect the current in-use  vehicle population  under a  variety  of
        realistic driving conditions, will  contribute to more accurate air quality
        modeling assessments, which in turn will help support the State's ability
        to produce appropriate SIPs.

1983 Program Request

     The Agency requests  a  total  of $1,307,800  and  6.2 permanent  workyears  for
this program, of  which $482,600  is  for the Salaries and  Expenses appropriation
and $825,200  is  for  extramural  purposes  under  the  Research  and  Development
appropriation.  This  reflects  decreases of  $116,400 and  $103,300 respectively,
which result from efforts to more efficiently schedule research work  needed  for
standards review*.

     The environmental processes  program  in  1983  is  concentrating entirely  on
characterizing emissions from  in-use vehicles,  which will  support the intention
of the  regulatory office to move  to  A  fleet-averaging   approach  to emissions
controls.

     -  The  emissions  characterization program  on  in-use heavy duty  diesel  and
        gasoline powered vehicles will  continue to focus on important gaseous and
        particulate emissions.  This work will  contribute to an  overall  Agency
        assessment of the potential impact associated with  increased use of diesel
        powered vehicles.

     -  The  research effort to characterize  the emissions of specific  volatile
        organic compounds and  carbon monoxide from in-use  vehicles  will  be con-
        tinued.  During a two year  period, approximately twenty vehicles  will  be
        investigated under a variety of driving  cycles  to  simulate typical road-
        way driving patterns.  The emissions factor  data will  be  used to improve
        the mobile source emissions inventory and ultimately the modeling predic-
        tion which  is used  to assess the  air quality  impact  associated  with
        mobile source emissions.
                                    A-56

-------
                                                 AIR

                                    Gases And Partfcles Non-Energy
                                     ACTUAL
                                      1981
JANUARY '
ESTIMATE
 1982
 MARCH
ESTIMATE
 1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
 1982            1983 VS 1982
PROGRAM
                                          (DOLLARS IN THOUSANDS)
Scientific Assessment
 Salaries & Expenses
 Research 8 Development

Technical Information
& Liaison
 Salaries 4 Expenses
 Research 4 Development

Monitoring Systems &
Quality Assurance
 Salaries & Expenses
 Research & Development

Health Effects
 Salaries 8 Expenses
 Research & Development

Environmental Engineering
8 Technology
 Salaries £ Expenses
 Research & Development

Environmental
Processes 4 Effects
 Salaries £ Expenses
 Research 4 Development
$263.3
$167.2
$374.9
$10.4
$3,446.6
$4,103.9
$4,813.4
$6,375.9
$172.3
$557.3
$2,107.4
$6,146.4
$216.3
$179.0
$432.4
$27.0
$4,517.8
$4,284.3
$5,900.1
$6,340.3
$242.5
$623.0
$2,922.3
$6,984.2-
$214.4
$177.7
$426.4
$22.7
$4,484.9
$3,903.2
$5,221.5
$4,340.3
$238.7
$598.9
$2,874.6
$6,829.1
$214.4
$177.7
$346.8
$17.9
$3,876.4
$3,346.1
$4,268.3
$2,986.5
$281.4
$516.5
$3,061.8
$6,447.1
$368.3
$250.0 ,
$270.3
$220.0 „
$3,354.4
$3,015.0,
$4,993.9
$2,990.1^

$153.9
$72.3
-$76.5
$202.1
-$522.0
-$331.1
$725.6
$3.6
-$281.4
-$516.5
$2,560.2 -$521.6
$5 ,233.1^$! ,214.0

-------
                                                                 AIR
r
JB
                                                    Gases And Particles Non-Energy

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                1982       1982       1982            1983 VS 1982
(DOLLARS IN THOUSANDS)
TOTAL:
Salaries A Expenses
Research & Development
Gases And Particles TOTAL
Hon-Energy
PERMANENT FULL-TIME WORKYEARS
Scientific Assessment
Technical Information
A Liaison
Monitoring Systems S
Quality Assurance
Health Effects
Envl ronmental Engineer! ng
4 Technology
Environmental
Processes S Effects
TOTAL PERMANENT WORKYEARS
$11,177.9
$17,361.1
$28,539.0
4.1
5.1
69.1
68.2
2.0
33.7
182.2
$14,231.4
$18,437.8
$32,669.2
4.5
6.0
70.3
70.9
3.9
39.0
194.fr
$13,460.5
$15,871.9
$29.332.4
4.5
6.0
70.3
55.9
3.9
39.0
179.6
$12,069.1
$13,491.8
$2S,560.9
4.5
5.8
65.8
54.9
3.9
40.0
174.9
$11,547.1
$11,708.2
$23,255.3
4.5
2.7
54,9
54=9

32.5
149.5
-$522.0
-$1,783.6
-$2,305.6

-3.1
-10.9

-3.9
-7.5
-25,4

-------
             AIR
& Technology

Environmental
Processes a Effects
Gases tod Particles Non-Energy

 ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
  1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
            1982       1982       1982            1983 VS 1982
TOTAL HORKYEARS
Scientific Assessment
Technical Information
& Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Envi ronmental Engl neer ing

7.0
6.6
74.7
77.5
4.4

7.5
9.9
77.1
82.9
6.7

7.5
9.9
77.1
67.9
6.7

7.5
8.9
77.6
66.9
6.7

7.0 -.5
4.2 -4.7
64.1 -13.5
65.5 -1.4
-6.7
   40.2
                                                  49.7.
                       49.7
49.7
46.3      -3.4
TOTAL HORKYEARS
210.4      233.8      218.8      217.3
                                              187.1     -30.2

-------
                                  AIR

                     Gases and Particles Non-Energy

BudgetRequest:

     The Agency requests  a total  of $23,255,300  and  149.5 permanent  workyears
for 1983,  a decrease  of  $2,305,600 and  25.4  permanent  workyears  from  1982.
Included in this total  Is  $11,547,100 for Salaries and Expenses  and  $11,708,200
for Research and Development, with decreases of  $522,000  and  $1,783,600,  respec-
tively.  This decrease results from a transfer of the control  technology function
to the 0x1 dants Non-Energy program,  more efficient phasing of  the environmental
effects work needed  for the  secondary  standards,  and a  decision to  limit  the
number of Inhalable Particul ate Network stations to 130.

Program Description

     This program  provides scientific data  on  health effects  fron  exposure  to
airborne sulfur dioxide, parti cul ate matter, and lead to  comply with Section; 108
and 109 of the Clean  A1r Act.  The Clean Air Act  requires  that the criteria  and
standards be reviewed and, 1f  necessary, revised  every  five  years;  therefore,
continually updated  Information regarding  health  effects is  needed to  support
maintenance or revision of the criteria and standards.  In obtaining such informa-
tion, the program provides regulatory decision makers and the  regulated community
with the assessment  and prediction  of  the environmental  effects of SOg,  lead,
and particles.   This  Includes  modeling  needed  by States  for SIPs,  projecting
ambient concentrations of pollutants, assessing the ecological  and material damage
of these pollutants and determining the  contribution of  new and modified  sources
to ambient gaseous and particulate pollution.  Chemical  and physical  measurement
methods are  developed and evaluated  while the program  also  provides  quality
assurance support.  In addition, this program supports the design  and operation of
research monitoring systems for ambient  gases  and particles,  and the development
and testing of exposure assessment methodologies.

SCIEMTI_FIC ASSESSMENT    .

1981_ Accomglishments^

     In 1981, the  Agency  used  a total   of  $430,500 for  this  program, of  which
$263,300 was for Salaries  and Expenses  and $167,200 was  for  extramural research
activities under the Research and Development appropriation.

     This program  is  directed at actually producing the updates  of the criteria
documents for sulfur oxide, particulate matter, and lead, which are necessary for
the mandatory review  of  the standards for these pollutants.  Because the review
cycle 1s staggered the work 1n the area is also phased accordingly.

     All resources in 1981  were dedicated to completing the sulfur oxide/parti cu-
late matter (SOX/PM)  air quality criteria document which  was  begun In earnest in
1980.  During  1981,   two  milestones   were  achieved: the  release  of  the second
external draft for the Clean Air  Scientific  Advisory Committee  (CASAC)  review;
and, the CASAC review of a third criteria document draft to conclude its evalua-
tion of the scientific merit of the document.

1982 Explanation of Changes from January Budget Estimate

                      January        March        Current
                     Estimate      Estimate      Estimate

                     $395.300      $392,100      $392,100
                                    A-60

-------
     The net decrease of -$3,200 results from the following action:

                ~ March.  (-$3,200)  This change represented a decrease of $3,200
     from the January budget,  of  which  $1,900  was for Salaries and  Expenses  and
     $1,300 was for Research and Development.

1982 Program

     In 1982, the  Agency  is  allocating a  total  of  $392,100  and 4.5  permanent
workyears to this program,  of  which $214,400  is under the Salaries  and Expenses
appropriation and $177,700 Is  for extramural  purposes  under  the Research  and
Development appropriation.

     The final  air criteria document  for  SOX/PM will  be completed and  submitted
to the Agency for  regulatory use  in  early  1982.   The first l«ad  criteria docu-
ment, completed 1n December 1977,  is  due  for updating and  revision In accordance
with new information  which has become available since 1977.  Currently,  litera-
ture searches are  being  made  to  identify  recent data  for  critical  evaluation
and presentation at  a planned  International  symposium  on  lead.   The  symposium
is a traditional preliminary activity which sets the stage  for the  20-24 month
process of preparing an updated air quality criteria document.

1983 Program Request

     The Agency  requests a total  of $618,300  and 4.5  permanent  workyears  for
this program, of which $368,300 is for  Salaries and Expenses and $250,000 is  for
Research and Development.   This  reflects  an  increase of  $153,900 and $72,300,
respectively, which  emphasizes  the  need  for  increased  resources to  carry  the
lead criteria document through to completion.

    The Scientific Assessment  program will  continue  Its effort to  complete  the
five-year update of  the lead criteria  document.  The effort Is under full contract
development In 1982 and enters 1983 with contractual  obligations to produce draft
documents for review by  CASAC and  appropriate external  panels.   Such  reviews
traditionally require additional work to be performed  on  the  documents to prepare
them for final approval.  Timely  resolution of  the  Issues  raised by these review
procedures would permit  final  document completion  in 1984.   The  final document
will serve as a  complete, comprehensive  summary  of  current knowledge  about  the
relationships of airborne  lead to  man  and his environment.   When completed  in
1984, the criteria document will  be used in the Agency's review of  the existing
ambient air standards for lead.

TECHNICAL INFORMATION AKD LIAISON

     Refer to  the   Oxldants  Non-Energy  narrative  for  a  description  of  those
Technical Information  and Liaison  activities  that are  common to all  research
and development  budget  sub-activities.   Activities   specific   to  this  budget
sub-activity are indicated in the program element  description below.

1981 Accomplishments

    In 1981, the  Agency  used  a  total  of 5385,300  for  this program,  of  which
$374,900 was under  the Salaries  and  Expenses  appropriation  and $10,400  was  for
extramural purposes under the Research and Development appropriation.
                                    A-61

-------
1982 Explanation of Changes from January Budget Estimate

                      January        March        Current
                     Estimate      Estimate      Estimate

                     $459,400      $449.100      $364,700

     The net  decrease of  -$94,700  results  from  several  actions,  as  follows:
               _            (-$10,300)   This  change  represented  a  decrease   of
     $10,300 of which  $6,000 was for  Salaries  and Expenses  and $4,300 was  for
     Research and Development.  This decrease resulted  In  slightly less
     technical Information  support  to  the gases and particles research  program.

     ~  ^programming.  (-$5,700)  This Agency-wide reprogrammlng provided
     resou r ces f o r  tra ns f er  of  the accountability  function to the  Office   of
     Management Systems  and  Evaluation  and,  In  addition,  provided additional
     resources for  the  Immediate  Office of  the  Assistant Administrator  for
     Solid Waste  and Emergency  Response.   (This  reprogrammlng  was Included  In
     a letter to Congress on December 16, 1981).

     -  Congressional Actions.   (-$77,600)  An  additional  reduction of  -$77,600
     wa s ap pll efl to tfie Sa fa r1 es and Expenses ($73,900) and Research and  Develop-
     ment ($3,700) appropriations to meet Congressional ly  mandated  appropriation
     levels.

     -  Transfer Authority.   (-$1,100)  The  net  change applied  to  this  activity
     Is made up of a decrease to Research and Development  for essential  operating
     costs In the Salaries and Expenses appropriation.

1982 Prog ram

    In 1982,  the  Agency  Is  allocating  a total  of $364,700 and 5.8  permanent
workyears to this program,  of which $346,800 Is under the Salaries  and  Expenses
appropriation and $17,900  1s for  extramural  purposes under the  Research  and
Development appropriation-

     Specific technical Information  products  planned  for  dissemination  Include:

     -  Response Report:  Philadelphia  Participate Characterization
        Study; and
     -  Journal Article:  Development and Operation of  Chronic Gaseous
        Inhalation Facility.

1983 Program Request

     The Agency requests a total  of $490,300  and 2.7 permanent workyears  for this
program, of  which $270,300  Is  for  Salaries  and  Expenses and  $220,000 Is  for
Research and Development.   This  reflects a decrease of $76,500  and an  Increase
of $202,100, respectively.  The  Increase  results  from  a decision to increase  the
support to the  States  needed  for delegation and is due mostly  to  increased  re-
liance on  extramural   contractor support and  automated  systems.   In addition,
specific technical Information plans will be  prepared and  support will be provid-
ed In  the  development  and dissemination of  the  products  to the  environmental
decision making community.                 ;

     In 1983, the Technical Information and Liaison program will  stress  providing
the necessary technical Information  to State and  local officials in support  of
their Increased role in administering environmental programs.
                                    A-62

-------
MONITORING SYSTEMS AND QUALITY ASSURANCE

1981 Accompl i shments

     In 1981, the Agency  used a total  of $7,550,500  for  this program, of  which
$3,446,600 was under the  Salaries  and Expenses appropriation and $4,103,900  was
for extramural  purposes under the Research and Development appropriation.

     The monitoring  program  is  primarily  directed toward  making  the  Inhalable
Participate Network  operational.   This network,  which  is  a  prototypical   or
pilot network, is actually run by the research monitoring  program and Is designed
to collect  and  evaluate samples for mass,  size and  composition and  to  provide
data on which  to base  a  new suspended  particulates  standard.  If  the particle
standard is revised to control  only  specific  sizes such as 10-micron,  or  species
of particles, the regulatory  burden  may be reduced significantly.   In  addition,
the program provides support to the  already existing air monitoring  networks  run
by the States and by the regulatory program.

     ~  The 138-Station Inhalable Participate Network (IP Network) completed  its
        first full year of  operation,  and  a report  summarizing  the  data  was
        produced.  In  addition, new  10-micron samplers  for  this  network were
        developed.

     -  Quality  Assurance  (QA)   guidelines,  audits,  and  technical  support were
        provided to the  National  Air Monitoring  Stations  (MAMS) and  the  State
        and Local Air Monitoring Stations (SLAMS).

     -  Chemical  analyses  of trace metals and statistical  trends  analyses were
        provided for the national network of  stations.

1982 Ex pia na ti .o^J^Chjinges^frpm J anua ry Budget Estimate

                      January        March         Current
                     Estimate      Estimate      Estimate

                   $8,802,100    $8.388.100     $7,222,500

     The net decrease  of  -$1,579,600 results  from several  actions,  as follows:

     '*  January •• March.   (-$414,000)   This   change  represented  a  decrease   of
     $414,uuu of which $32,900 was  for Salaries and Expenses and  $381.100  was  for
     Research and Development.  This decrease resulted  in  fewer quality  assurance
     audits performed on State and  local  air  monitoring  networks.

     -  Deprogramming.   (+$54,300)   An Agency-wide  reprogramming  of -$21,100 from
     this program provided resources for transfer  of the  accountability function
     to the Office of Management Systems and Evaluation  and,  in addition, provided
     additional  resources for the Immediate Office  of  the  Assistant Administrator
     for Solid Waste and Emergency  Response.   A second  reprogramming  of +$300,000
     functionally transfers  the resources supporting  air and  hazardous  waste
     monitoring in the energy research  and development program to  the  air  gases
     and particles program.   This will provide better management of these programs
     In conjunction  with  similar efforts.   (These two  reprogramrnings,  totalling
     +5278,900,  were included  1n  a  letter to Congress  on December 16,  1981).

        Additionally, during  the development  of the operating plan,  several mis-
     cellaneous reprogrammings,  which are not reportable  to Congress,  were made
     to this activity and resulted  in a  net decrease of  -$224,600.

     -  Congressional  Actions.  (-$1,219,900)   A reduction of -$372,900  was  taken
     against the March  estimate reflecting  the  September  12X  reduction  to  the
     Research and Development appropriation.  An additional reduction  of -$847,000
                                    A-63

-------
     was applied to the Salaries and Expenses appropriation to meet Congression-
     al ly mandated appropriation levels.

     -  Tra nsfer Authority»  (No Change)   The net change applied to this activity
     is made up of a decrease  of -$184,200 from Research  and Development and an
     increase of +$184,200 to  Salaries and Expenses.   The increase will support
     major in-house projects of the  lab;  maintenance; and  fund  the  purchase of
     gases and CO monitors.

1982 Program

     In 1982, the Agency  is  allocating a  total  of $7,222.500 and 65.8 permanent
workyears to this  program,  of which  $3,876,400 is  for  Salaries and Expenses
and $3,346,100  is  for  extramural  purposes  under the Research  and Development
appropriation.

     -  The  IP  Network is being  fitted  with the new 10-micron  samplers at the
        request of the  Agency's Office of Air  Quality Planning  and Standards.
        About 40 stations  Mill  receive the  samplers  in  1982 and  the remainder
        in 1983 and 1984.

     -  We are  continuing to  respond to  requests by  Regional,  State and local
        air pollution agencies  for  Quality Assurance (QA) procedures, including
        performance audits of  5LAMS/NAMS  stations,  maintenance of  a repository
        of reference samples and standards, publications  of  new and revised QA
        guidelines, and the Agency Mandatory QA  Program.

     -  Methods for continuously monitoring selected emissions sources are being
        evaluated in response to the requests of enforcement officials for test-
        ing compliance with standards.

     -  Chemical analyses of trace metals and statistical  analyses of trends are
        being performed as a means  of determining the effect of Agency actions
        on national air quality.

     -  A  system  for  receiving, analyzing, and reporting  the precision  and
        accuracy of all  air monitoring  data  1s being developed.

1983 ProgramRequest

     The Agency requests a total  of  $6,369,400  and  54.9  permanent workyears for
this program, of which $3,354,400 is for  Salaries and Expenses and $3,015,000 is
for extramural   research under  the Research and Development appropriation.  This
reflects a decrease of  $522,000 and $331,100 respectively,  which results primarily
from the decision to limit the number of  IP  Network stations to 130,  which is
sufficient for the Agency's purposes.  This decision was made  in conjunction with
the Office of Air Quality  Planning and Standards.  The primary focus will continue
to be the  Inhalable  Participate Network  due to the need  to revise the existing
participate natter  standard.   Additionally,  the need  for  improved monitoring
accuracy will be emphasized through  the quality  assurance and  systems development
work.

     -  The  IP  Network will  continue to  be operated and upgraded with the new
        10-micron samplers.  Mass and chemical  composition  will  be determined
        for samples collected  periodically from 130 sites — over 7,000 filters
        per year.

     -  Monitoring systems for  pollutants in  ambient  air and in source emissions
        will  continue to  be  developed and  Improved.   Selected systems  will  be
        subjected to  single   and multi-laboratory  evaluation  to  identify  and
        correct sources of errors.  There  are demands  for this work from Federal,
                                      A-64

-------
        Regional, State,  and local  officials  who  recognize  the  need  for  more
        reliable, specific, and sensitive systems.

     -  The  quality  assurance program will  continue  to  support the programs  of
        EPA's Office  of A1r, Noise and Radiation; other Agency  program  offices;
        the  State and local  air quality  control  agencies;  and  other laboratories
        1n the  Office  of Research  and  Development.   Quality  control   samples
        will be obtained and used in audits.  The system  for receiving, analyzing
        and  reporting  precision  and accuracy  will  continue  to  be  developed.
        Technical support  will be  provided to State and local agencies  required
        to implement  the  quality  assurance  requirements  for   air  monitoring
        contained 1n  40 CFR  58.   Workshops,  training programs,  and performance
        audits will  be provided.

     -  At the  request  of various  State and Regional commissions,  regional  and
        plume transport will  be studied  using  an airborne laser  system  to  char-
        acterize aerosol distribution in  the troposphere and to monitor  long-range
        transport of  polluted air masses.   Particle  production, depletion,  and
        transport within plumes will be  studied.  This information  is needed  for
        the  preparation of SIPs.

HEALTH EFFECTS

1981 Accomplishments

     In 1981, the Agency  used a  total  of $11,189,300 for  this program,  of  which
$4,813,400 was for Salaries  and  Expenses and $6,375,900  was for  extramural  pur-
poses under  the Research and Development appropriation.

     This program provides the latest Information on the effects  on human health
of exposures of  sulfur  oxides, particles  and  lead.   This information is needed
to evaluate  the  adequacy of  ambient air quality standards  and   is  Incorporated
Into periodically updated criteria documents.

     Major accomplishments are summarized as follows:

     -  A large clinical  study was undertaken to examine  the  interactions  among
        gaseous pollutants, such as  ozone,  nitrogen dioxide, and  sulfur  dioxide,
        and particulates,  specifically  ammonium  sulfate,  b1-ammonium  sulfate,
        sulfuric acid, and ammonium  nitrate.   Using a sophisticated statistical
        design, over 300 human exposures  in  different combinations were  completed,
        and the data collected are  being analyzed  in  1982.  The  results  of this
        analysis will  be  used to  establish  priorities  for   future  research.

     -  The  operating  characteristics,  mass  output,  and  particle size  of  an
        aerosol generator developed by EPA scientists  were  independently  verified
        by an expert contractor.  This Instrument is  used  to deliver bronchocon-
        strictor drugs of  known size and concentration to  test airway reactivity
        following pollutant exposure.  Subjects treated with such drugs  simulate
        the  reactive characteristics of sensitive populations such as asthmatics.

     -  A microcomputer-based irapedence  cardlography  Instrument  which  was  de-
        veloped by EPA  scientists was  validated In  healthy  subjects.   This  is
        a non-Invasive technique  to measure meaningful changes  1n cardiac
        function during pollutant exposure.   ,

     -  A study  on the  pulmonary  effects of  0.75  ppm  sulfur  dioxide  (SOg)  in
        human volunteers  was published.   Although  the current 24-hour  standard
        1s .14 ppm, levels  of SOg In  ambient air around  point  sources   such  as
        smelters occur as  high as  the 1.0 ppm  range.  The study Indicated  that
        S02 Increased airway  resistance  and that subjects  with positive  allergen
        skin tests were significantly more reactive  to S02>
                                       A-65

-------
     -  Laboratory-induced emphysema was  developed  in hamsters and the  level  of
        inpalrnent was  successfully  related to  the pulmonary functional  status
        of the animal,  thereby making  an animal model  of  this sensitive  human
        subpopulation available for use in air pollution studies.

     -  As part  of  the  Agency's efforts to establish a data base  for  evaluating
        the need  for  a  size-related inhalable  participate  matter  standard,  the
        first study  utilizing  coarse  mode particles present  in urban  aerosols
        MBS completed.  Effects on pulmonary  host defense systems  Mere  examined
        and results are  being  analyzed in 1982. The findings will  be used  in
        the development of standards  for coarse and  fine mode particles.

1982 Explanation of Changes from January Budget Estimate

                      January        March        Current
                     Estimate      Estimate      Estimate

                  $12,240,400    $9.561,800    $7,254,800

     The net decrease of  -$4,985,600  results  from  several  actions, as  follows:

     -  January - March.   (-$2,678,600)   This  change represented  a decrease  of
     $2,678,600 from the January budget,  of which $678,600  was for Salaries  and
     Expenses and  $2,000,000 was  for   Research  and  Development.   The  decrease
     in the  Salaries and  Expenses  appropriation  was  a result  of a  shift  In
     resources to Hazardous Pollutants  Non-Energy Health Effects.

     "  Reprograpiing. (-$46,200) During  the  development of the operating  plan,
     severaTS'seel 1 aneous reprogramnrings, which are  not  reportable to  Congress,
     were made to  this  activity  and  resulted  in  a  net decrease  of  -$46,200.

     -  Congressional  Actions.   (-$2,260,800)   A reduction  of  -$1,278,800  was
     taken against the March estimate  reflecting the September 12% reduction  to
     the Research  and Development  appropriation.  An  additional   reduction  of
     -$982,000 was applied to  the  Salaries and Expenses  ($907,000) and  Research
     and Development  ($75,000)  appropriations to meet  Congressionally  mandated
     appropriation levels.

1982 Program

     In 1982, the Agency  is  allocating a  total of $7,254,800 and  54.9  permanent
workyears to this program, of  which  $4,268,300 is for the Salaries and  Expenses
appropriation and $2,986,500 is  for  extramural  purposes  under the Research  and
Development appropriation.

     These resources support the following work:

     Particle size effects.  The Agency is considering regulating airborne
particles according to  size  because  both  the effect  and the biological  site  of
the effect differs with respect to size.  Different health effects due to  particle
size are  being  studied  in  animals  under  controlled  laboratory conditions.
Normal animals and animals impaired  to produce emphysema-like lesions are  being
examined for  acute,  intermittent,  and  chronic  effects on  susceptibility  to
infectious disease, a  number  of  pulmonary function  parameters and  other  bio-
chemical measures.                          ,

     Combined.J>xposuj^sto_jaj8e5jnd  particles.  Because environmental  exposures
to §ases"ranlfTjSrtricTes~tend^to  occur  as mixtures  of  pollutants,  acute and chronic
effects of combined exposures  to  various  gases  and  particles  are  being studied
in humans  and  animals  in the laboratory.   In humans,   effects  of simultaneous
exposures to  gases and  aerosols  are   being  evaluated.  In  animal toxicology,
                                     A-66

-------
several species of laboratory animals are being exposed to inhalants both individ-
ually and in combinations.   Normal animals and animals with  compromised respira-
tory systems are  being  studied with a  pulmonary function test  battery for evi-
dence of lung disease.

     Susceptible population groups.  In order to  Implement  the  Clean Air  Act,
potentially susceptiblepopulation  groups,   such   as  persons  with  respiratory
disease, are being evaluated  in terms of  their  sensitivities to  single and mixed
exposures to gases  and particles.  At-risk  subject groups  Include  persons  with
chronic obstructive lung disease,  cardiovascular disease, asthma, and individuals
with genetic enzyme deficiencies.

     Extrapolation and modeling.  This  research  focuses  on developing  models for
extrapolating health  effects  from  animal   and  mechanical   models  to  humans.
Because of different  particle sizes  and characteristics  of  respiratory activity
in different species,  regional  deposition of gases and  particles in  the nose,
trachea and lungs, varies  across  species.  The Importance of the differences Is
being studied so that dose levels  can be related to human effects.

     New indicators of biological  response.   New  biological  response  indicators
of the  rteaitfi  effects  of gases  and particles  are being  developed,  and their
clinical significance Is being  determined for biochemical,  pathological, hemato-
logical, and Immunological responses in  animals and humans.  This work Is aimed
at developing  more  accurate and  efficient  measures  and predictors   of  health
effects.

1983 Program Request

     The Agency requests a total  of  $7,984,000 and 54.9  permanent workyears for
this program, of which $4,993,900  is for the Salaries and Expenses appropriation,
and $2,990,100  is for  extramural purposes  under  the  Research  and Development
appropriation.   This  reflects an  Increase of $725,600 and  $3,600, respectively.
This Increase will  facilitate an  earlier completion of  Important health effects
projects and an expansion  of work in a number of areas  which are needed for the
review of standards.

     The overall  objective  of  the health  research program  continues to  be to
provide techniques, data and  information that can be used to Improve the estimate
of risk  to  humans  resulting from the  inhalation   of  gases  and  particles.   The
effort will  be  composed of  laboratory  studies  of  both  humans  and  animals.   In
the human studies, the response of healthy subpopulations and at risk populations
will be compared for exposures to  pollutants for threshold levels at which clini-
cally significant health  effects  appear.  Health  effects will   be quantified by
changes in pulmonary  and  cardiovascular function and In  biochemical  and Immuno-
logical measurements made  on blood and  tissue.   The utility  of  subclinical indi-
cators of biological  response as  indicators  of clinically  significant response
continue to be  evaluated.   Animal studies  will investigate  normal  and impaired
animals using  pulmonary,  pathological,   hemotologlcal,   Immunological  and  bio-
chemical indicators  of  response*   Regional   deposition  of particles  In the lung
will also be  studied to  assist In  the  development of  dosimetric extrapolation
models.  The data-are required to allow judgement  regarding  the  review and revi-
sion of  the present  regulations  for total  suspended particles,  lead  and  sulfur
oxides.

     Combined exposures to gases and particles.  Human clinical  research on gases
and particles at  EPA's uniquely equipped  facility  at Chapel  Hill  will  be accele-
rated with regard to  the effects  of  exposure  to  real-world combinations of gases
and particles  such  as sulfate  and nitrate aerosols,  ozone, sulfur  dioxide and
nitrogen dioxide.
                                      A-67

-------
     Susceptible population groups.  The effects  of  the exposures to the  pollu-
tants described above will  be studied  on  specially  sensitive population  groups
such as asthmatics since these groups may  be more at risk or  susceptible  to the
effects of these pollutants than  normal  healthy Individuals.

     Particle size effects.  Acute and  chronic effects of  fine  and coarse  mode
particles on animals  under controlled laboratory conditions  will  be evaluated.

     Extrapolation and modeling.   Animal toxicologies!  research will be  expanded
1ntramural ly in  such  areas as metabolic modeling to  Improve the  extrapolation
of mult1 species animal data to human effects.  The metabolism  studies are  neces-
sary for  extrapolating  from  animals to human health   effects.   Resources  Mill
also be expanded  intramurally to  determine  the effects on  animals of  combined
exposures to gases and particles  as a complement to the  human work.

     Mew indicators of biological response.  Development of   new  indicators  of
biological response win be accelerated in  order to hasten  the development  of
more efficient and accurate predictors and  indicators of toxidty.

ENVIRONMENTAL ENGINEERING AND TECHNOLOGY

1981 Accomplishments

    In 1981, the  Agency used a  total  of  $729,600  for this  program,  of which
$172,300 was under the Salaries  and  Expenses appropriation and $557,300 was for
extramural purposes under the Research and  Development appropriation.

     The program focused on air pollution problems associated with the metallurgi-
cal industry.  Field tests  to gather inhalable particulates emissions data  were
completed at 8 major metallurgical sites and about 50 field tests were completed
to gather data on fugitive emissions from open sources (controlled or uncontrolled)
at metallurgical operations.  The control  of fugitive particles  from 7 different
metallurgical sources by the use  of charged fog was evaluated.  Also, engineering
and technical assistance was provided to regional  offices to  aid  in  the Implemen-
tation of the non-ferrous smelter order program.

1982...Explanation of Changes from  January Budget Estimate

                      January        March         Current
                     Estimate      Estimate      Estireite

                     $865,500      $837,600      $797,900

     The net  decrease  of  -$67,600  results  from  several  actions,  as  follows:

     -  January— March.    (-$27,900)   This  change  represented  a decrease  of
     $27,900 from  the  January budget,   of  which  $3,800  was for  Salaries  and
     Expenses and  $24,100   was   for   Research  and  Development.    This   decrease
     resulted in  the  deferral of a demonstration   of  particulate  controls  at
     a ferroalloy plant.

     ~  Cqngresslona 1  Actions.   {-$39,700)  An  additional  reduction of  -$39,700
     was applied to the"""SITaries  and Expenses ($16,100)  and Research and  Develop-
     ment ($23,600) appropriations to meet Congressionally  mandated  appropriation
     levels.

     -  Transfer Authority.  (No  Change) The net change applied  to  this  activity
     is made up  of a  decrease of  -$58,800  from Research and Development  and  an
     increase of +$58,800 to  Salaries and  Expenses.  The increase will allow lab
     program reviews,  monitoring  of  extramural  projects, as  well as the conduct
     of more program evaluation studies.
                                     A-68

-------
1982 Program.

     In 1982,  the  Agency  1s  allocating a  total  of  $797,900  and  3.9  permanent
workyears to this  program,  of which $281,400 1s under the  Salaries and Expenses
appropriation and  $516,500 1s  for extramural  purposes  under  the Research  and
Development appropriation.

     This research  program 1s  being  executed  1n  concert  with  the  Oxidant  and
Hazardous Air  Pollutant  Industrial   control   systems  evaluation  and  emissions
characterization.  More specifically, systems to capture  Industrial  emissions of
gases and  particles  are   being  evaluated,  and Inhalable  particles  from  metal
coating, metallurgical processes,  and fugitive emissions  1n general,  are  being
characterized.  Support to regional offices  to aid in Implementing the non-ferrous
smelter order program Is being continued.

19B3 Program Request

    No resources are  requested  for this program in 1933.   This  program has been
transferred to the  Oxidants Non-Energy  area and  resources are  included  for  air
control technology research there.

ENVIRONMENTAL PROCESSES AMD EFFECTS

1981  Accomplishments

     In 1981, the  Agency  used a total  of $8,253,800  for  this program,  of  which
$2,107,400 was under  the  Salaries and Expenses appropriation and  56,146,400  was
for extramural purposes under the Research and Development appropriation.

    This program focuses  on two areas of concern,  1)  the  development, validation
and improvement of  air  quality  models needed by States and OAQPS to develop  and
enforce cost-effective control  strategies,  and 2) the development of scientific
Information as to  the effects  of particles,  sulfur  oxides  and lead  on  crops,
sensitive ecosystems and materials needed for the periodic updates of  the criteria
documents.

    Modeling-  In  the modeling  program efforts  focused  on the  validation  of
several types  of  models   including   source  apportionment,  urban,  and  regional
models.

    -  The source apportionment model 1ng effort  initiated In 1980 produced reports
       on the characterization of  the chemical  element balance  of Denver aerosol
       In order to identify the sources of the Denver brown haze, and the charac-
       terization of  aerosols in  the  Great Smoky Mountains which  examined  the
       relative contribution  of  natural  and anthropogenic  sources  of visibility
       reducing hazes.

     -  A two year plan  was Initiated to produce an  interim, short-term,  urban-
        scale Inhalable  participate  (and/or  fine  parti cul ate)  model  and   to
        produce an Interim  Inhalable  particul ate mesoscale  model to treat short-
        term concentrations related to  transport  and  transformation  from one or
        more large  point  sources.  The plan  was  developed  in  response to  the
        Agency's need for regulatory tools and State Implementation Plan
        guidance as a  result  of a revision, of the particulate  National  Ambient
        Air Quality Standard  to require  size and chemically speciated standards.

        A progress report was published on the study of persistent elevated
        pollution episodes  In the northeastern United  States.   A  peer reviewed
        journal article  was published  describing  the observed  relationship  be-
        tween ozone and  sulfate 1n  the Northeast  under  summertime  conditions.
        These studies provide the  first available data  base for  the evaluation
        of regional scale particulate models which are currently  under develop-
        ment.
                                     A-69

-------
    -   The User's Network for Applied Modeling of Air Pollution (UMAMAP)  system
        was expanded to 21 air quality simulation models In 1981.

    Ecol ogi cal  1 mpacts .  In  1981,   the  efforts  1n  this  area  concentrated  on
the effect of pol 1 u tants on crops and materials.

        Studies were Initiated to examine  materials damage cost/benefit relation-
        ships as  a  result  of  various pollutants.   Damages under  consideration
        Included weathering, corrosion  and  erosion,  and  soiling.   The  current
        program 1s Improving the data base  on  dose  response  relationships  and
        documentation of  the  human  response  1n  taking  nrftlgatlve  measures  by
        conti mil ng measurements on  exposed  construction materials and by  stati-
        stically analyzing maintenance costs.

     -  The  results  of  research Involving  a native  plant  species,  which  has
        developed and evolved  In the vicinity of a coal -fired power  plant,  has
        Indicated that  such  vegetation 1s more  tolerant  of  SOj Induced  Injury
        than similar  species  collected at locations  free of  SOj pollution.   In
        addition to the  known  502 effects on  growth and yield, It  appears  that
        S02 can  Influence the  gene  pools  of native vegetation  causing potential
        changes 1n their  adaptability to  stress.  These  studies  are  providing
        an exposure/dose  data  base  for  the  assessment of  yield  reductions  to
        agricultural  crops as a result of  exposure to S02.

     -  The Interactive effects of  SO? and N02 are  being evaluated 1n  greenhouse
        and field oriented  studies  to provide documentation  of the  consequences
        of these  pollutants on  the  growth and yield  of crops  and tree  species.
        In greenhouse studies, 15 species  of crops and trees  of economic  Impor-
        tance have been  evaluated with respect  to S02/H02 effects.   Field  plot
        experiments have been  set-up  to  conduct additional  growth/yield  studies
        under field conditions.  Since the  data  base relevant  to the  effects  of
        N02/S02 interactions Is limited, this  research  will provide  guidance for
        economic assessments  of the  Impacts  of NOg/SC^  mixtures   on crop  and
        forest species.

1 982 Expl anatlon of Changes from January Budget Estimate

                      January        March        Current
                     Estimate      Estimate      Estimate

                   $9,906,500    $9,703,700    $9,528,900

     The net decrease  of  -$377,600 results  from  several  actions,  as  follows:
                - March.   (-$202,800)   This  change  represented a  decrease  of
     $20^,800 fronf the  January budget,  of  which  $47,700 was  for  Salaries  and
     Expenses and $155,100 was for Research and Development.

     "  Reprfflranmlng. ( +$153 ,800)  During the development of the operating plan,
     sewraTrafsceTYaneoiis reprogrammings, which are  not  reportable to Congress,
     were made  to  this  activity  and  resulted  in  a  net  increase of  +$153,800.

     -  Congressional Actions.  (-$328,600)  A  reduction  of -$180,000  was taken
     against the March  estimate  reflecting  the September 12%  reduction  to  the
     Research and Development appropriation.  An additional reduction of -$148,600
     was applied to the Salaries and Expenses appropriation to meet Congressional -
     ly mandated appropriation levels.

     -  Transfer Authority.  (No Change)  The net change applied to this activity
     1 s made up  of a decrease of -$202 ,000  from Research and Oevel opment and an
     Increase of +$202,000 to Salaries and  Expenses.  The Increase  Is necessary
     for the basic  maintenance and service  agreement for the  lab's minicomputer
     system; for maintenance,  parts and  repairs of lab-owned computer terminals,
                                     A-70

-------
     word processors, microfiche  readers,  extramural activities;  for laboratory
     supplies, materials and special exposure equipment.

1982 Program

     In 1982, the Agency  is  allocating a total of  $9,528,900  and 40.0 permanent
workyears for this program, of which $3,081,800 is under the Salaries and Expenses
appropriation and $6,447,100  is  for extramural purposes  under the  Research  and
Development appropriation.

     Modeling.  The 1982 program continues to  focus  on  source  apportionment, and
urban and regional  scale models, as well as  the User's Network for Applied Modeling
of Air Pollution (yNAMAP).

     -  Development of  source apportionment  or  receptor models  to  estimate the
        impact of sources at receptor sites continues,  so that expensive emission
        inventories are not required for developing cost effective State Implemen-
        tation Plans.  A workshop is scheduled to provide guidance for regulatory
        requirements on the  source apportionment of ambient aerosols.  A  final
        report will provide  recommendations  for  the use of  source apportionment
        methods.

     -  The first  phase of  a two-year plan to produce  interim models  for  size
        and chemically  speciated  particles  in urban areas  with mesoscale  con-
        tributions, to  be used  for guidance  standards and  for subsequent  SIP
        revisions, is being completed.

     -  An interim project  report on the characterization of  prolonged elevated
        pollutant epidsodes  and the meterological  conditions  conducive to  their
        formation is  being  prepared.  The  work  is  important  for the  continua-
        tion of  the  development  of a size  and  chemically  speciated  regional
        scale particulate  model.   These models  are  required  to  assist in  the
        evaluation of Impacts of  large point  and  area sources  distributed  over
        regional scales on  air  quality measures such  as  aerosal  concentrations,
        visibility and acid deposition.  The effectiveness of alternative
        control scenarios to meet acceptable ambient levels depends upon adequate
        regional and long range particulate models to predict ground-level concen-
        tration of particles for distances  up to 1000km.

     -  A  new  version of  UNAMAP  1s being  distributed  to users  with supporting
        documentation and  user's   guides.   Important users  of models  on  UNAMAP
        include State  and local  environmental  agencies  and   EPA   Regional  and
        regulatory offices.   The   extension,  refinement and   standardization  of
        the UNAMAP system  is continued to  ensure that  adequate models are avail-
        able for exposure  and impact  assessment,  for  special research  studies
        and for comformance to regulations.

     Ecological Impacts.  Efforts  1n this  program  will  continue  to  focus on the
effectsof pollutants on  Important agricultural  crops,  in  addition efforts are
being initiated  to integrate air  quality  models  with  crop  yield  statements.

     -  Several  reports  needed  for  secondary  standards  are  being  produced
        discussing cost/benefit studies of  materials  damage,  Including effects
        on the  erosion  of housepaint,  the  soiling  of materials  by parti cul ate
        matter, and the effects  on corrosion of steel.

     -  Efforts  are  being Initiated to  integrate air  quality and environmental
        data and  atmospheric dispersion  models  with   crop  yield/air  pollution
        Impact statements.   Specific  support includes: (1)  a  review of exposure
        simulations and meteorological  data collection  to Insure that simulations
        are representative of current and projected air pollution levels;
        (2) a summary and status report of best approach(es)  to integrated ground
                                    A-71

-------
        level concentrations of  SOj  and ozone with dose/response  functions  from
        from the  National  Crop  Loss  Assessment Network  (NCLAN)  field  studies;
        and (3) an evaluation  of the  application of air quality data and  models
        for predicting ground level  concentrations  of  air pollutants and environ-
        mental factors in rural areas.

     -  Field  reseach  is  continuing  for the  evaluation  of  the  interactive
        effects of 502  and  NO3 on  cr°P  growth and  yield.   Both  seasonal  and
        diurnal responses are  being  examined.  Vegetation  growing  in  different
        climatic regions  of the United   States  responds  differently   to  SOg-
        Research is  focusing  on providing  scientific  data  which  address  the
        differing responses  of  crops  and  native vegetation to varying  climatic
        conditions.  The  1982  program evaluates soil  moisture responses,  since
        moisture conditions are  one  of the most important  environmental  factors
        which control the sensitivity of  vegetation  to SOg.  Technical  reports
        are being prepared for  inclusion  in  the air quality criteria documents.

1983 Program Request

     The Agency requests  a  total  of  $7,793,300 and 32.5 permanent  workyears  for
this program, of which $2,560,200 1s  for  Salaries  and Expenses  and $5,233,100 is
for extramural purposes  under  the Research and Development appropriation.   This
reflects a decrease of $521,600 and $1,214,000, respectively, which  results  from
an effort  to  more efficiently  phase  the  research  needed  for the  5 year  cycle
for standards review.  Therefore, there 1s a  reduction  1n  some  efforts  in  source
apportionment modeling and  crop loss assessments.   Additionally,  since  adequate
data exist for many crops the field  studies are being  phased-down.

     The primary  focus  1n  1983  will  be  the  effort  put into  refining and  ex-
panding the  air  quality  models needed  by the  Industrial  community  and  State
and local   decision-makers to  make  Intelligent  decisions  about  industrial  ex-
pansion and  environmental  control  strategies.  In  addition,   research  on  eco-
logical effects needed for the criteria document updates will  continue.

     Modelling.  The  1983 program  will   stress  improving  the  models  available
for use by states In the  SIP  process.  This will   be done by adding new  models
to the  UNAMAP system  as  well  as  improving  the  existing urban,  regional  and
source apportionment models.

     -  A  planned three-year  effort  to   Improve  'the  interim  urban  scale  and
        mesoscale models  for  fine  and  Inhalable   particles  begun during  1982
        will continue in 1983.   The  models  will   be  upgraded  with additional
        chemical  conversion modules,  a  visibility  module and the  best  available
        values for  transformation rates,  dry  deposition   rates  and dispersion
        parameters.

     -  An  interim model  which  treats  primary and   secondary  sulfate  over  a
        Regional  scale will  be completed.  The  model  will  be  evaluated  against
        data from an earlier field study,

     -  Several  new  models  will  be  added to the   UNAMAP  system,   Including  the
        Interim urban and nesoscale  participate models, and.  If available,  any
        source apportionment  models.    Continued  upgrading  of models  already
        contained in  UNAMAP is  planned,,  Including  model   evaluation  and  model
        accuracy/uncertainty assessments.*   Improved  dispersion parameters   and
        methods will   be  developed  and  recommended  for  use  in  UNAMAP  models.

     -  Reports reviewing the  application  of  air quality models in  the  decision
        making process will  be produced.   Selected UNAMAP  models  will  be  eval-
        uated against available  high  quality  data  bases to  examine model  sen-
        sitivity to input data  and output predictions.
                                    A-72

-------
     -  Data  from  field   studies  in  Denver  will  be  used  to evaluate  source
        apportionment methods.  Reports describing analysis techniques, including
        the precision,  range  of  uncertainty  of  the  measurements,  and  their
        application to the  chemical  element  balance  apportionment  methods  will
        be produced.

     Ecological impacts.   The  focus   in  1983  will  be  on  integrating  the  air
quality models with  the  crop yield  data.   In  addition  studies  of  the effect of
pollutants on crops will  continue.

     -  The  Integrated damage model   will be  exercised  with  new  data and  with
        improved damage functions  for  the  various types  of  exposed  materials.
        This work will provide a  basis for a national  assessment  of materials
        damage and its associated costs.

     -  Scientific and economic studies will be conducted to validate and develop
        dose/response functions for  the assessment of the impacts  of SOg alone
        and in mixture  with  03  on  major agronomic  crops.   In addition,  field
        studies of  crops  at  one  site  will be  conducted for  these pollutants.

     -  Air  quality  models  will  be adapted  to  generate an  exposure/dose  data
        base for both  SO? and 03  assessments and  will  be integrated with  crop
        yield and  air pollution impact models.   The modeling approach  for  air
        quality is  needed,  since  monitoring  data  for  air  pollution levels  in
        agricultural regions  is  almost  non-existent  and  cannot  be  used  to
        address regional  and national Impacts.

     -  An  Integrated economic  assessment model  will   be developed  to  provide
        cost/pricing information relative, to crop yield  impacts and air quality.
        This Initial assessment model will provide guidance in the developemnt of
        air pollution  control strategies  in  agricultural  areas  of  the  United
        States.
                                     A-73

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                                              AIR

                                      Air Quality S Stationary Source Planning A Standards
                                                  ACTUAL
                                                   1981
                                               JANUARY
                                               ESTIMATE
                                                1982
 MARCH
ESTIMATE
 1982
CURRENT
ESTIMATE
 1982
ESTIMATE INCREASE +
  1983   DECREASE -
       1983 VS 1982
             PROGRAM
                                                          (DOLLARS IN THOUSANDS)
T-
•>j
Emissions Standards 4
Technology Assessment
 Salaries 4 Expenses
 Abatement Control 4
 Compliance

Pollutant Strategies
> A1r Standards
Development
 Salaries 4 Expenses
 Abatement Control It
 Compliance

State Program Guidelines
& Regulations
Development
 Salaries 4 Expenses
 Abatement Control 4
 Compliance

TOTAL:
 Salaries 4 Expenses
 Abatement Control 4
 Compliance
                                               $3,944.4   $4,429.5   $3,949.5   $3*858.3   $3,550.4   -$307.9
                                              $14,486.4  $16,437.4  $12,581.7   $8,880.8   $9,693.2    $812.4
                                               $1,987.5   $2,044.7   $2,044.7   $2,014.2   $1,991.6    -$22.6
                                               $1,492.0   $1,527.0   $1,512.4     $917.9   $1,128.4    $210.5
                                               $3,580.4   $3,823.2   $3.823.2   $3,651.1   $2,465.8 -$1,185.3
                                               $1,221.4   $1,304.6   $1,267.9     $935.2     $960.0     $24.8
                                               $9,512.3  $10,297.4   $9,817.4   $9,523.6   $8,007.8 -$1,515.8
                                              $17,199.8  $19,269.0  $15,362.0  $10,733.9  $11,781.6  $1,047.7
             A1r Quality 4
             Stationary Source
                        TOTAL    $26,712.1  $29,566.4  $25,179.4  $20,257.5  $19,789.4   -$468.1

-------
                                                 AIR

                         Air Quality 1 Stationary Source Planning & Standards

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982


PERMANENT FULL-TIME HORKYEARS
Emissions Standards 4
Technology Assessment

Pollutant Strategies
1 Air Standards
Development

State Program
Guidelines 4 Regulations
Bevel opmen t

TOTAL PERMANENT HORKYEARS
102.7      113.5       99.1       94,1       87.8      -6.3
 46.5       43.6       43.6       43.6       39.8      -3.8
 92.0       93,4       93.4       93.4       64.3     -29.1
241.2      250.5      236.1      231,1      191.9     -39.2
TOTAL MORKYEARS
Emissions Standards 4
Technology Assessment

Pollutant Strategies
I Air Standards
Development

State Program
Guidelines S Regulations
Development

TOTAL HORKYEARS
110.1      122.3      106.3      101.3       93.6      -7.7
 52.9       49.7       49.7       49.7       44,4      -5.3
100.2      101.4      101.4      101.4       68.3     -33.1
263.2      273.4      257.4      252.4      206.3     -46.1

-------
                                     AIR

           A1r Quality and Stationary Source Planning and Standards


Budget Request

     The Agency requests  a  total  of $19,789,400 and  191.9 permanent  workyears
for 1983, a  decrease  of $468,100 and 39.2 permanent  workyears from 1982.   In-
cluded in this  total  is $8,007,800 for  Salaries  and Expenses and $11,781,600
for Abatement, Control and Compliance.  This decrease primarily reflects reduced
emphasis on  case-by-case  SIP reviews  and the diminished  Federal  role  in trans-
portation/land-use planning with  respect to State SIP development activities.

Pro gram De s c ri pt1on

     This subactivity includes the setting  of emission standards  for stationary
sources, which Involves pollution  control  technology and cost assessments  and
other Industry  analyses  which  support  the  standard  setting  function.  Also
included are the  review  and  revision, if  necessary, of  ambient air  quality
standards; pollutant  assessments;  the development of pollutant  control  analy-
tical tools and guidelines; the translation of control strategies  Into  regula-
tory actions; and  the assessment of the energy implications of  regulatory  ac-
tions.

     Emissions Standards and Technology Assessments -- National  emission  Stan-
dards for stationary sources are set under  Section ill and  112  of the  Clean  Air
Act.  Section 111 mandates the Environmental  Protection Agency  to establish  New
Source Performance Standards (NSPS).  Section 112 authorizes National  Emission
Standards for Hazardous Air Pollutants (NESHAPs).

     New Source Performance Standards reflect the performance  of the  best dem-
onstrated systems  of  emission  reduction,  considering cost  and  energy  Impact
for specific processes or  facilities 1n a source category.  The analysis support-
Ing the NSPS considers technical  feasibility; cost;  and economic, energy  and
environmental Impacts.  The background Information published as part of the NSPS
setting process provides useful data to State agencies in defining  best  available
control  technology, lowest achievable emission rates, and  reasonably  available
control  technology, when  such determinations must be  made under  other sections
of the Clean A1r Act.

     Pollutant Strategies and Air Standards Deyelopment— The major activities
of this program element are:  11 j  Review and  revision"as^appropriate of all exist-
ing National Ambient A1r Quality  Standards as mandated by  the Clean  Air Act,  (2)
Identification and assessments  of the potential  hazardous air pollutants,  In-
cluding the determination as to the appropriateness of their  listing under Sec-
tion 112 of  the Clean Air Act,  and  (3)  Analytic  support to Agency regulatory
efforts to set emission standards for pollutants regulated under Sections 111(d)
and 112.

     State Programs Guidel1nes and Regulations  Deyelopment  -- The objectives of
this program element are the development of guidelines and  regulations that  set
forth requirements for air pollution control  programs implemented by the States
under the Clean Air Act  (principally State Implementation  Plans);  development of
technical  guidance for modeling; emission Inventory development and air quality
standard attainment demonstrations; and maintaining an overview of  the develop-
ment and  Implementation  of  air  pollution  control  programs  to assure  national
consistency at the regional, State, and local levels.  The  State  Implementation
Plans (SIPs) provide  for the  attainment and maintenance  of National  Ambient
Air Quality  Standards,  and establish  programs  for  prevention  of significant
deterioration (PSD) of  air  quality 1n clean areas,  and  for the protection of
visibility 1n national parks and wilderness areas.
                                   A-76

-------
EMISSION STANDARDS AND TECHNOLOGY ASSESSMENT

1981 Accomplishments

    In 1981, the Agency obligated 518,430,800 for this program of which $3,944,400
was for Salaries and Expenses and $14,486,400  for Abatement,  Control, and Compli-
ance,  These contract resources were used to continue work related to setting NSPS
and NESHAPS.  Work continued on setting performance standards for all  listed source
categories.  Eleven NSPS were  proposed, three were promulgated, and two reviews of
existing standards were completed.  Control technique guidelines  (CTG) for seven
volatile organic  compounds  (VOC) sources  were  drafted.   After public  comment,
final CTG's  will  be  issued.   Reviews  of  NSPS  for  primary  copper  smelters  and
primary lead and  zinc  smelters were  completed.   NESHAPS were proposed for three
benzene sources.  Work was in process  on  14 NESHAPS  categories.

1982 Explanation ofChanges^ from^Jajiuary  Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                   $20,866,900     $16,531,200    $12,739,100

     The net decrease  of  -58,127,800 results  fron  several  actions, as  follows:

     -  January ~ March.  {-$4,335,700)  This  change represented a decrease of
     $4,335:,70Q from"the January  budget, of which $480,000 was for Salaries and
     Expenses and $3,855,700 was  for  Abatement,  Control  arid Compliance.

     -  Congressional Actions.   (-$3,792,100)   A reduction  of  -$2,818,300  was
     taken against the  March  request reflecting  the  September  12%  reduction to
     the Abatement,  Control and  Compliance appropriation*   An additional  reduc-
     tion of -$973,800  was  applied to the Salaries and Expenses ($91,200)  and
     Abatement, Control   and  Compliance  ($882,600)  appropriations  to meet  Con-
     gressionally mandated appropriation  levels.

1982Program

     In 1982, the Agency is allocating a total  of $12,739,100 and 94.1 permanent
workyears for this program,  of which $3,858,300  is  for  Salaries  and Expenses and
$8,880,800 is for extramural  purposes  under the Abatement,  Control and Compliance
appropriation.   These contract resources are  being  used for engineering studies
and other analyses needed to set  NSPS,  NESHAPS,  and  to provide information to the
Agency and States on  reasonable  control technology  for  development and review of
State implementation plans (SIPs).  Efforts are  continuing to complete the Clean
Air Act mandated  NSPS;  sixteen  proposals  and 14 promulgations  are planned  for
1982 representing a substantial  increase  over  1981.   Reviews  of  existing NSPS
standards for grain elevators, Glaus sulfur plants, and Kraft  pulp mills are being
completed.  The analysis of benefits and impacts of  selected  NSPS is continuing.
Four NESHAPS for benzene sources  are  scheduled for promulgation.

1983 Program Request

     The Agency requests a total   of $13,243,600  and 87.8 permanent workyears for
this program, of  which $3,550,400 is for the  Salaries and  Expenses  appropriation
and 39,693,200 is  for the Abatement, Control  and Compliance  appropriation.  This
is a decrease of  $307,900 in  Salaries  and  Expenses  but  an increase of $812,400,
in the contract area.   This reflects increased  development of  hazardous pollutants
standards and acceleration of  the schedule to develop new source  performance stan-
dards in 1983.   Efforts will continue on the Clean Air Act mandated NSPS projects.
Eleven proposals and 15 promulgations  are planned.  Reviews of existing  NSPS for
primary aluminum  smelters and  utility  steam  generators  will  be  completed.   Two
                                    A-77

-------
NESHAPS covering coke  oven  emissions  are  expected  to  be  promulgated  and  one pro-
posal  (pending  a  listing  decision)  is planned.  Screening  will  be  conducted  to
determine principal sources of pollutants which are under consideration for list-
ing.   Reviews of mercury and beryllium are expected to be completed.

POLLUTANTSTRATEGIES AND AIR STANDARDS DEVELOPMENT

1981 Accomplishments

     In 1981, the Agency obligated $3,479,500 for this program of which  $1,987,500
was for Salaries and Expenses and $1,492,000 was for Abatement,  Control  and  Com-
pliance.  Contract  support  for  evaluation of  national ambient air quality  stan-
dards  (NAAQS);  analysis of the  environmental, economic and  regulatory  impacts  of
the possible standards revisions; and the development of  an  improved  risk assess-
ment methodology.  Rescission of the hydrocarbon standard was  proposed.   Work was
underway to revise the carbon monoxide, nitrogen oxides,  sulfur  dioxide,  and par-
ticulate matter (PM) standards.   Pollutant assessment activities  resulted in rec-
ommendations not to list either cadmium or  toluene  as hazardous  pollutants.   Ex-
posure assessments and ranking of public health risk for  43  chemicals were circu-
lated  and are being revised following public comments.

1982 Explanation of Changes from January Budget Estimate

                 January          March          Current
                 Estimate         Estimate        Estimate

               $3,571,700      $3,557,100     $2,932,100

     The net decrease  of -$639,600  results  from  several  actions,  as  follows:

     "  January - March.   {-514,600)    This  change  represents   a   decrease  of
     $14,600 from  the  January  budget from Abatement,   Control  and Compliance.

     •  ReprpgraiiinJTig.   (-$8,100)  During the  development of  the operating plan,
     severat misceTTaneous reprogrammings, which are  not  reportable  to  Congress,
     were made  to  this  activity and  resulted  in  a  net  decrease  of  -58,100.

     -  Congressional Actions.  {-$616,900)   A  reduction  of -5479,600 was  taken
     against the March  estimate reflecting the September  12S  reduction to  the
     Abatement, Control  and  Compliance appropriation.   An  additional   reduction
     of -$137,300 was  applied to  the  Salaries and  Expenses ($30,500)  and Abate-
     ment, Control  and  Compliance  ($106,800)  appropriations to meet Congressio-
     nal ly mandated appropriation levels.

19B2 Program

     In 1982, the Agency  is  allocating a  total of $2,932,100 and 43.6 permanent
workyears for this program,  of which $2,014,200 is  for the  Salaries  and  Expenses
appropriation and 5917,900 is for extramural  purposes under the Abatement, Control
and Compliance  appropriation.   The  rescission  of  the hydrocarbon  standard and
revision of the carbon monoxide  standard  are  being  promulgated.   Revision to the
participate matter NAAQS  is  being  proposed.  In addition,  reviews  of  the  NAAQS
for NOg and  SOg are  nearing completion  for  proposal early  in 1983.    Develop-
ment of  alternative approaches to  NAAQS  risk assessment to  determine  their
feasibility for integrating  risk assessment  into  the decision-making  framework
for revising the standards  is continuing.  Listing  decisions  are being  made  for
eight pollutants,  with  detailed health and source assessments  being  continued
on eight other pollutants.
                                    A-7S

-------
1983 Program Request

     The Agency requests a total  of  $3,120,000 and 39.8 workyears for this pro-
gram, of  which $1,991,600 is  for the  Salaries and  Expenses  appropriation and
SI ,128,400 is  for  the Abatement,  Control  and Compliance appropriation.   This is
a decrease of  $22,600 and an  increase  of $210,500,  respectively,  and  reflects
increased extramural  funding  for pollutant assessment  work  in 1983.  Revisions
of the  nitrogen  dioxide and  sulfur dioxide  standards  will  be proposed  and  a
revised participate matter standard will  be promulgated.   Application and  evalu-
ation of a risk assessment methodology will be  initiated in considering possible
revisions of the  lead  and ozone standards.   Hazardous pollutants  listing decisions
will  be made for  eight chemicals  assessed  in 1982.

STATEPROGRAM GUIDELINES AND  REGULATIONS DEVELOPMENT

1981  Accomplishments

     In 1981, the Agency obligated S4,801,800 for this  program of which $3,580,400
was for Salaries and Expenses and $1,221,400 was for Abatement, Control  and Com-
pliance.  This included contract support  of technical  guidance  for nonattainment
SIP submittals, with particular emphasis  on data base development for 1982 Os/CO
submittals, and  for new  source  review/prevention   of  significant deterioration
analysis (NSR/PSD).  In an effort to  reduce inventory  and streamline  SIP process-
ing time, three  experimental  processing   techniques were pilot tested,  then ex-
panded for full use in all  of  the regions.   Elimination of SIP backlog is expected
during 1982.  Technical  and policy review of proposed approval/disapproval actions
on SIPs submitted in  response to the Clean Air Act  requirements remained a major
effort.  NSR/PSD efforts  focused  on encouraging additional  States  to take over
the permitting program.  The Best Available Control Technology/Lowest Achievable
Emission Rate  (BACT/LAER)   Clearinghouse was  maintained  and improved through em-
phasis on quality assurance  of  data.   Visibility and  regional   consistency regu-
lations were promulgated and  a  decision  was made  to  repropose the  stack height
regulations.  Work to improve the consistency  of models  proceeded.

1982 Explanation  of Changes from January Budget Estimate

                   January          March           Current
                   Estimate       Estimate      Estimate

                  $5,127,800      $5,091,100     54,586,300

     The net decrease  of  -$541,500  results  from  several  actions,  as  follows:

     -  January ^Jareh.   (-$36,700)   This  request  represents  a   decrease  of
     S36,/Ob from  the January budget  from Abatement,  Control  and Compliance.
     No significant programmatic  effect  is expected.

     -  Reprogramming.   (+$151,900)   During  the  development  of the  operating
     plan, several  miscellaneous  reprogrammlngs,  which are  not  reportable  to
     Congress,  were made  to  this activity and  resulted  in  a net  Increase  of
     +$151,900.

     -  Congressional  Actions.  (-$656,700)  A  reduction of  -$337,400  was taken
     agaTnst We   March  request reflecting  the  September  12%  reduction  to the
     Abatement, Control  and  Compliance appropriation.  An  additional  reduction
     of -5319,300 was applied to  the  Salaries  and  Expenses (585,900) and  Abate-
     ment, Control  and  Compliance ($233,400)  appropriations  to meet Congressio-
     nal^ mandated appropriation  levels.
                                     A-79

-------
1982 Program

     In 1982, the Agency  is  allocating  a total of $4,586,300  and  93.4  permanent
workyears for this program, of which $3,651,100 is for  Salaries  and Expenses  and
$935,200 is  for  extramural purposes  under the Abatement, Control  and Compliance
appropriation.  Contracts will continue to support SIP  development and  modeling.
The emphasis  in  1982  continues to be national  management and evaluation of  all
major SIP programs which  were Initiated  in previous  years.  Policy  guidance  and
technical assistance in relation to €0/03  SIP  submittals, due  in 1982,  for  areas
given attainment date extensions  to 1987,  is continuing.  Regulations implementing
the revised  NAAQS for  particulate  material (PM) are being proposed.  Regulations
updating the reporting requirements for continuous emissions  monitoring are under-
way and stack height regulations  are being promulgated.  The provision  of model-
ing guidance  on  power  plant and  other major  sources  emissions, and assistance to
States implementing regulations  dealing  with  visibility and  new  source  review/
prevention of  significant deterioration,  are  continuing,  as  is  the  BACT/LAER
Clearinghouse.  Assistance to  States implementing  regulatory  reform measures  is
also being provided and  revised  modeling  guideline is being Issued.  The Agency
anticipates substantial success in eliminating SIP  backlogs  during  1982.

1983 Program Request

    The Agency requests  a total  of $3*425,800  and 64.3 permanent workyears  for
this program, of which $2,465,800  is for  the  Salaries and Expenses appropriation
and 3960,000  is  for the  Abatement,  Control  and Compliance appropriation.  This
represents a decrease of $1,185,300 and  an increase of $24,800, respectively;  and
reflects reduced oversight and emphasis on case-by-case SIP reviews  and the dimin-
ished Federal role in transportation/land-use  planning,  with respect to  State  SIP
development  activities.  National  management and oversight  of  major SIP programs
will continue to be performed, with policy and technical  guidance focused on high
priority issues such as application of regulatory reform measures and policy  guid-
ance for  implementing  revised ambient  standards.   Increased  attention will   be
given to  improving  technical  guidance,  developing program  oversight procedures,
improving interstate equity,  and developing alternative  approaches  to regulations
as a way of  attaining  air quality objectives.   The multi-year program for evalua-
tion and  validation  of. air quality  models and development of  emission  factors
for SIP  revisions  will  be continued.   Regulations  and guidelines  implementing
revised ambient standards for particulate matter will  be promulgated.
                                      A-80

-------
                                                                AIR

                                         Mobile Source Air Pollution Control a Fuel Economy

                                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                               1982       1982       1982            1983 VS 1982

                                                            (DOLLARS IN THOUSANDS)
               PROGRAM
r
00
Emissions Standards
Technical Assessment
& Characterization
 Salaries & Expenses
 Abatement Control &
 Compliance

Testing, Technical 4
Administrative Support
 Salaries & Expenses
- Abatement Control &
 Compliance

Emissions 1 Fuel
Economy Compliance
 Salaries & Expenses
 Abatement Control 4
 Compliance

Mobile Source Air
Pollution Control &
Fuel Economy
 Salaries 4 Expenses
 Abatement Control 4
 Compliance
$4,304.6
$4,230.9
                                                 $4,215.2
                                                    $34.5
                                                 $1,789.8
                                                   $102.2
$4,028.1   $4,121.3   $3,348.6   -$772.7
$2,774.6   $1,303.4   $2,080.0    $776.6
                      $4,859.1   $4,485.2   $4,201.9   -$283.3
                        $237.1     $168.9     $958.3    $789.4
                      $1,951.9   $1,412.8   $1,430.2     $17.4
                        $347.2      $76.0               -$76.0
                                                            $4,405.6
                                                            $2,004.0

-------
                                                 AIR

                          Mobile Source Air Pollution Control ft Fuel Economy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982

                                             (DOLLARS IN THOUSANDS)
a>
OJ
Mobile Sources
Monitoring In-Use
Emissions Assessment
 Salaries & Expenses
 Abatement Control i
 Compliance

Emissions Testing,
Analysis S Data
Support
  Salaries S Expenses
                                                               $272.5
                                                             $1,443.9
                                                              $3,793.9
TOTAL!
 Salaries t Expenses
 Abatement Control S
 Compliance

Mobile Source Air
Pollution Control S
Fuel Economy
                                        TOTAL
                                                  $10,309.6   $8,472.0  $10,839.1  $10,019.3   $8,980.7 -$1,038.6
                                                   $4,367.6   $3,447.9   $3,358.9   $1,548.3   $3,038.3  $1,490.0
$14,677.2  $11,919,9  $14,198.0  $11,567.6  $12,019.0    $451.4
PERMANENT FULL-TIME WORKYEARS
Emissions Standards
Technical Assessment
S Characterization
                                                       98.1
                           93.1
89.4
61.9
-27.5

-------
                                                 AIR

                          Mobile Source Air Pollution Control & Fuel Economy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Testing, Technical 4                   63.3                  51.3       49.0       50.2       1.2
Administrative
Support

Emissions 4 Fuel                       47.1                  34.0       34.0       28.3      -5.7
Economy Compliance

Mobile Source Air                                113.4
Pollution Control *
Fuel Economy

Mobile Sources                                     6.7
Monitoring In-Use
Em1s s1ons Asse ssraen t

Emissions Testing,                                32.2
Analysis S Data
Support


TOTAL PERMANENT WQRKYEARS             208.5      152.3      178.4      172.4      140.4     -32.0


TOTAL WORKYEARS
Emissions Standards                   129.3                 112.4      111.6       75.0     -36.6
Technical Assessment
S Characterization

-------
                                                 AIR

                          Mobile Source Air Pollution Control 8 Fuel Economy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
3»

to
Testing, Technical A
Administrative
Support

Emissions S Fuel
Economy Compliance

Mobile Source Air
Pollution Control 4
Fuel Econoniy

Mobile Sources
Monitoring In-Use
Emissions Assessment

Emissions Testing,
Analysis S Data
Support
                                                      89.0
                                                      54.4
78.7       75.7       73.9       -1,8
44.5       40.3       36,6       -3,7
                                                                132.0
                                                                  8.1
                                                                 49.6
TOTAL WORKYEARS
                                                     272.7      189.7      235.6      227.6      185.5      -42.1

-------
                                     AIR

             Mobile Source Air Pollution Control  and Fuel  Economy

Budget Request

     The Agency  requests  a total  of $12,019,000 and  140,4 permanent  workyears
for 1983,  an  increase  of  5451,400 and  a  decrease   of  32.0 permanent  workyears
from 1982.   Included  in this total  is  $8,980,700  for Salaries  and Expenses  and
53,038,300 for  Abatement  Control  and Compliance,  with  a decrease of  $1,038,600
and an  increase of  $1,490,000 respectively.  This  decrease primarily  reflects
completion of most  federally mandated  standards, reduced  inspection/maintenance
(I/M) support activities,  streamlined certification procedures,  and  a shift  in
emphasis to in-use vehicle compliance.   The increase in extramural funds  pri-
marily reflects  increased  efforts  to develop and  assess  an  in-use  compliance
program and to improve the fuel economy  program.

Program Description

     This subactivity carries out programs for the  control  of mobile  source emis-
sions as  required  by the  Clean  Air Act, and generates information and  analyses
related to motor vehicle fuel economy under the terms of the Motor Vehicle Infor-
mation and Cost Savings Act.

     Emission Standards,Technical  Assessment and Characterization — This program
includes: l) the establistiment^iF emission standards for mobile  sources,  and asso-
ciated technical analyses  and  emissions characterization;  2) the development  of
technical procedures and  guidelines applicable  to  the control  of emissions from
in-use vehicles; 3) the measurement and assessment  of in-use motor  vehicle emis-
sion levels; and 4) technical analyses  related to the development of information
on motor vehicle fuel economy.

     Testing, Technical  and Administrative Support  — This  program provides
in-house laboratory, data  processing, and  other support  for  mobile source  air
pollution control and fuel economy  activities as well as test  procedure develop-
ment and refinement.

     Emissions and Fuel  Economy Compliance -- This  program  provides  for  the  en-
gineering review of data to  determine the compliance of new motor vehicles with
emission standards  and  other  pre-production  control  requirements,  followup  re-
view of the validity of manufacturers' data, and  associated technical activities.
Similar procedures for fuel economy determinations  are also Included.

EMISSION STANDARDS. TECHNICAL ASSESSMENT AND CHARACTEIRIZATION

1981 Ace omp1 is hments

     In 1981,  the  Agency  obligated  $8,535,500  for  this  program,   of  which
54,304,600 was for  Salaries  and  Expenses and $4,230,900 was for Abatement, Con-
trol and Compliance.  Contract  supported standard  setting,  emissions characteri-
zation, technology  assessments,  and  I/M  program establishment.   The  regulatory
schedule was  revised to  accommodate auto  industry  regulatory  relief  actions,
including heavy  duty  standards  revisions.   The  Agency proposed the heavy duty
diesel participates  standard and  promulgated interim  high altitude  standards.

     EPA provided support to States implementing  1/M programs and conducted test-
ing 1n the Portland, Oregon area to provide comparative  data on emissions in both
I/M and non-I/M cities.

     Development of  emission  factors,   related  assessments  of  in-use  vehicle
emission factors,  and  analyses  of  the air  quality  impacts  of mobile  sources
continued.  Characterization of emissions from vehicles  fueled with  methane!  and
diesel fuel were performed.   Evaluation of  the  Rlcardo methanol engine  was also
initiated.
                                    A-85

-------
     The Agency  provided  fuel  economy  device evaluations.   The Section  404(a)
fuel economy report was completed and work  was in  progress  on the Section  203(a)
report (on the relationship between emission  standards and  fuel  economy) to  Con-
gress.

1982 Explanation of Changes from January Budget Estimate
                        January
                       Estimate
  March
Estimate
Current
Estimate
                                   $6,802,700    $5,424,700

     The net increase  of  +$5,424,700 results  from  several actions, as  follows:

     -  Restructuring.  (+$6,802,700)  This  restructuring  combines  the  resources
     and activities in Mobile  Source Standards and Guidelines and  Mobile  Source
     Monitoring into a  single  program function.  These  combined functions  will
     improve the  management and  accountability  of  these  related  activities.
     These new program functions  will  group the establishment of emission  stan-
     dards with  the development  of  technical  procedures  and  guidelines for the
     control of emissions  from  new in-use vehicles.

     -  Reprogramming. (+$861,600)  The changes in funds  within mobile source air
     pollution control  are the  result of shifting staffing patterns  due  to  attri-
     tion and the  need  to focus staff on priority regulatory reform  activities.
     These changes also reflect a  reduced need for contracts for  technical  analy-
     ses of the certification program due to a decision to perform these analyses
     in-house.  In addition, there was a  need to  put additional  funds into  emis-
     sion standards and testing and technical administrative  support to provide
     contract support for  increased emission factors, testing  and resultant  tech-
     nology assessment work.

     -  Congressipnal  Actions.   (-$2,239,600)   A reduction  of  -$1,487,500  was
     taken against  the  March request reflecting  the  September  12" reduction  to
     the Abatement, Control  and Compliance appropriation.  An additional  reduc-
     tion of -5752,100  was applied to the  Salaries  and Expenses  ($582,100)  and
     Research and  Development  ($170,000)  appropriations  to meet  Congressionally
     mandated appropriation levels.

1982 Program

     In 1982, the  Agency  1s allocating  a total of $5,424,700 and 89.4  permanent
workyears for this program, of which $4,121,300 is for Salaries  and Expenses and
SI ,303,400 1s for extramural purposes under the Abatement,  Control  and Compliance
appropriation.  The Agency is completing activities on  revised aircraft  and  heavy
duty evaporative emission  standards  and  proposals for  light duty diesel  particu-
lates averaging, non-methane hydrocarbons, and revised  heavy duty HC and CO  stan-
dards.  EPA  1s  Issuing a  number  of regulatory  relief studies  which the Agency
promised through the auto  task  force:  feasibility of the 1985 light-duty CO stan-
dards.  EPA  is  issuing a  number  of regulatory  relief studies  which the  diesel
particulate standard;  appropriateness of the heavy duty transient test and  useful
life provisions; and the Industry  burden posed by Section  202(a)(4) of  the  Clean
Air Act (hazardous pollutant control).

     Support 1s being provided  to States implementing  I/M programs and  improve-
ments 1n I/M effectiveness are  under Investigation.

     Characterization of  hazardous  pollutants is continuing  in  accordance  with
provisions of  Section  202(a)(4).    Assessment of diesel  and  methanol  emissions
are continuing, and the Agency is characterizing  emissions from the use  of  other
                                    A-86

-------
 s
synthetic fuels.  Development of emission factors,  related  assessments  of  In-use
vehicle emission levels, and analyses  of  the  impacts  of mobile sources are con-
tinuing.  The Agency  scheduled  completion of  a report mandated  by Congress  on
locomotive emissions.

     EPA is performing  assessments  of  fuel  economy trends  and  Congress will   be
provided with updates.  Fuel  economy device  evaluations  are  also being performed.

1983 ProgramRequest

     The Agency requests a total of $5,428,600 and 61.9 permanent  work years  for
this program, of which  $3,348,600 is for  the  Salaries and Expenses  appropriation
and $2,080,000 is for the  Abatement,  Control  and Compliance appropriation. This
represents a decrease of $772,700 and  an  increase of $776,600  respectively from
1982 and  reflects the completion of much nil snaking  activity,  a  lower level   of
I/M support efforts,  and  reduced in-use  vehicle testing  for  emissions factors
development.  The increase  reflects  additional emissions  characterization  and
fuel economy program improvements.

     Regulatory development will concentrate  on completion of  regulatory  relief
and regulatory reform measures,  and  on reassessment of the  need  for specific regu-
lations. Promulgated final  rules will  include  heavy  duty HC  and  CO (non-catalyst)
standards, light duty diesel particulates  averaging,  heavy duty  diesel particu-
lates and  non-methane HC   standards.   Regulations for  fuels  and  fuel  additives
and heavy duty NOX standards  will be proposed.

     Support to I/M  programs  will continue at  a reduced  level as States  begin  op-
eration of these programs.   The  emphasis will  be on  enhancing State  capabilities,
providing information  on  newer technology  vehicles,  and  updating the Section
207{b) warranty regulations.

     Technology assessment work  will  feature  characterization of emissions from
vehicles powered by  synthetic  fuels,  assessment of  nitrosamine  emissions from
heavy-duty vehicles,  studies  of hazardous pollutant control issues, and updated
reports on the diesel cancer  issue.

     The fuel economy analysis and  device  testing program will  continue.

TESTING.TECHNICAL ANDADMINISTRATIVE SUPPORT

1981 Accompl1shments

     In 1981,  the  Agency   obligated  54,249,700  for  this program,   of   which
$4,215,200 was for  Salaries and Expenses  and  $34,500 was for Abatement, Control
and Compliance.  Contract  funds supported testing  to determine  compliance with
emissions standards.  Fuel  economy  testing was  also  provided for use in  determin-
ing fuel economy label values and corporate average fuel  economy.  Data processing
management, engineering and computer  support,  as well as general  administrative
support were provided.

1982 Explanation of  Changes from January Budget Estimate


                        January         March          Current
                       Estimate       Estimate        Estimate

                                   $5,096,200      $4,654,100

     The net increase  of  +$4,654,100 results  from  several  actions, as  follows:

     -  Restructuring.  {•'•$5,096,200)  Resources from emission  testing, analysis
     and data support and  standards and  guidelines are being conformed into  the
     new program element entitled  Testing and  Technical Administrative Support.
                                     A-87

-------
                                                               1

     The new program  element  includes:   1) in-hoyse laboratory,  data  processing
     and related support  for  mobile source  air  pollution control;  and 2)  fuel
     economy activities.

     -  Reprogramming. (-$233,700)   The  changes  in  funds  within  mobile  source air
     pollution control are the result of shifting staffing patterns  due to  attri-
     tion and the need  to focus staff on priority  regulatory reform activities.
     These changes also reflect a reduced need for  contracts  for technical  analy-
     ses of the certification  program due  to a  decision  to  perform these  analy-
     ses in-house.  In  addition, there  was a need  to  put additional   funds  into
     emission standards and testing  and  technical  administrative  support to  pro-
     vide contract support for  increased emission  factors, testing and resultant
     technology assessment work.

     -  Congressional  Actions.   (-5208,400)   A  reduction  of -$66,700  was taken
     against the March  estimate reflecting  the  September 12%  reduction to  the
     Abatement, Control and  Compliance   appropriation.   An additional   reduction
     of -$141,700  was applied to the Salaries and  Expenses appropriation to  meet
     Congressionally mandated  appropriation levels.

     -  Transfer Authority.  (No Change)   The net change  applied to  this activity
     is made "up 'of  a  decrease  of -$64,400  to Abatement, Control and  Compliance
     and an increase  of +$64,400 to Salaries and  Expenses.   This transfer  will
     provide needed intramural  funds for supplies  for the Ann  Arbor Laboratory.

1982 Program

     In 1982, the Agency  is allocating  a total  of $4,654,100 and 49.0 permanent
workyears for this program, of  which $4,485,200 is  for Salaries and  Expenses and
$168,900 is for extramural purposes  under the Abatement,  Control and  Compliance
appropriation.  The Agency is  performing tests to determine compliance  with emis-
sions standards, support the enforcement recall  program,  develop emission factors
for In-use vehicles, and generate fuel economy information.  Personnel  and  admin-
istrative resources, ADP management, engineering and computer support, and labora-
tory support are being provided.

1983 Program Request

     The Agency requests  a total  of  55,160,200  and 50.2  permanent workyears for
this program, of which  54,201,900 Is  for the Salaries  and Expenses  appropriation
and 5958,300  is  for the  Abatement,  Control  and Compliance  appropriation,   this
reflects a decrease of  $283,300 and  an  increase of $789,400, respectively,  from
1982 and  reflects  a  reduced  need   for  in-house  resources  in  connection  with
equipment and supplies  for laboratory purposes.   Additional  extramural  funds are
required for  efficient ADP operations.   Contracts  funding  is  provided  for  an
In-use testing program, including a  start-up effort for assessing the feasibility
of an  In-use  compliance  program.   In-use vehicles will be procured,  processed
for testing, and tested to provide data  to assess program feasibility and provide
a basis  for  full  implementation of  an  in-use compliance  program 1n the future.
Testing will  also continue for certification emission factors and recall purposes.
In addition,  continued support for  administrative,  ADP and  other  laboratory
support services will  be provided.

EMISSIONSAMD FUEL ECONOMY COMPLIftNCE

1981 Accomplishments

     In 1981, the Agency obligated SI,892,000 for this program, of which  $1,789,800
was for Salaries and Expenses  and $102,200 was for Abatement, Control, and Compli-
ance.  Contract funds  supported certification operations.   The Agency certified
216 engine families.  Work progressed on the development  of certification program
                                      A-88

-------
regulatory reforms, as  well  as on an  in-use  vehicle compliance program  relying
on some form of emissions averaging to replace the current preproduction certifica-
tion and final high altitude performance adjustments were completed,

     In the  fuel  economy area,  revisions  to  improve  the representativeness  of
EPA's fuel economy  data were prepared for proposal.  Input was  provided  for the
Gas Mileage  Guide  and  the  Corporate Average  Fuel  Economy  (CAFE)  programs,

1982 Explanation of Changes from January Budget Estimate


                        January        March       Current
                       Estimate      Estimate      Estimate

                                   $2,299,100    $1,488,800

     The net  increase  of +$1,488,800  results  from several actions,  as  follows:

     -  Restructuring.   {+$2,299,100)   The  activities  and  resources  of  this
     program element  include:   1)  engineering  review  of  data  to determine  new
     motor vehicles compliance with  emissions  standards  and other  pre-production
     control requirements;  2)  follow-up review of  the  validity of  manufacturer's
     data, and associated  technical  activities; 3)  similar  procedures for  fuel
     economy determinations.
                       (-$627,900)  The changes in funds within mobile source air
     pol lutlon control are the result of shifting staffing patterns  due to  attnV
     tion and the  need  to focus staff on priority  regulatory  reform  activities.
     These changes also reflect a reduced need for contracts  for technical  analy-
     ses of the certification program due to a decision to perform these analyses
     In-house.  In addition, there was a  need to  put  additional  funds into  emis-
     sion standards  and  testing and technical administrative  support to provide
     contract support for increased emission factors,  testing and resultant tech-
     nology assessment work.

     -  Congressional Actions.   (-$182,400)   A reduction  of -$22,000 was  taken
     against the March  estimate reflecting  the   September 12% reduction to  the
     Abatement, Control  and Compliance  appropriation.   An  additional  reduction
     of -$160,400 was applied to the  Salaries and Expenses appropriation to meet
     Congressional ly mandated appropriation levels.

1982 Program

     In 1982, the  Agency  is allocating a total of  $1,488,800  and 34.0 permanent
workyears for this program, of which  $1,412,800 is  for Salaries and Expenses  and
576,0001s  for  extramural purposes under  the Abatement, Control and Compliance
appropriation.  Approximately 250 engine families are projected for certification,
Measures to  streamline the  certification process  without weakening  compliance
are being promulgated and  Implemented.   Further development  of an In-use vehicle
compliance program  is projected.  The  fuel  economy  program  regulatory changes
are being finalized, and  emphasis is  continuing  on enhancing the representative-
ness of fuel economy values.  Input is also  being  provided to  the gas guides and
CAFE program.

1983 Program Request

     The Agency requests  a total  of $1,430,200 and 28.3 permanent  workyears  for
this program, all  of  which is  for  the Salaries and Expenses  appropriation.   This
represents an  increase  of $17,400 for  Salaries  and  Expenses  and a  decrease  of
                                    A-89

-------
$76,000 under the  Abatement,  Control  and Compliance  appropriation and  reflects
the streamlined certification  process.   The  1983 activities will  aim at replac-
ing portions  of  the certification program with  appropriate alternative compli-
ance measures,  such as  an  in-use,  vehicle testing-based  compliance  program.
Fuel economy  program improvements  will  continue and  input  will  be provided for
the gas guides and CAFE program.
                                     A-90

-------
                                                 AIR

                                  State Programs Resource Assistance

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE *
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       198Z       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Control Agency Resource
Supplementat1on(l05
Grants)
 Abatement Control &
 Compl lance

Training
 Salaries & Expenses
 Abatement Control &
' Compliance

Northeast Corridor
Regional Modeling
Project
 Abatement Control ft
 Compliance
          $89,524.4  $87,734.9  $87,734.9  $87,734.9  $69,954.7-$17,780.2
             $219.3     $381.8     $381.8     $223.5     $238.1     $14.6
             $987.9     $661.0     $661.0   $1,000.0     $624.0   -$376.0
             $545.0
TOTAL:
 Salaries ft Expenses
 Abatement Control S
 Compllance

State Programs
Resource Assistance
TOTAL
             $219.3     $381.8     $381.8     $223.5     $238.1      $14.6
          $91,057.3  $88,395.9  $88,395.9  $88,734.9  $70,578.7 -$18,156.2
$91,276.6  $88,777.7  $88,777.7  $88,958.4  $70,816.8 -$18,141.6

-------
                                                  AIR
                                   State Programs Resource Assistance

                                     ACTUAL    JANUARY     MARCH
                                      1981     ESTIMATE   ESTIMATE
                                                1982       1982
                               CURRENT   ESTIMATE INCREASE +
                               ESTIMATE    1983    DECREASE -
                                198Z            1983 VS 1982
PERMANENT FULL-TIME WORKYEARS
Training
TOTAL PERMANENT WORKYEARS
4.3
4.3
6.0
6.0
6.0
6.0
4.0
4.0
4.0
4.0
TOTAL WORKYEARS
Control Agency Resource
Supplementation (105
Grants)

Training
TOTAL WORKYEARS
29.2



 4.3


33.5
64.7



 8.0


72.7
8.0


8.0
6.0


6.0
4.0


4.0
-2.0


-2.0

-------
                                     AIR

                      State Programs Resource Assistance
Budget Request
     The Agency requests  a  total  of $70,816,800 and 4.0 permanent workyears  for
1983, a decrease  of $18,141,600 from 1982.   Included  1n this total  is  $238,100
for the Salaries  and Expenses  appropriation  and $70,578,700 for the  Abatement,
Control and Compliance appropriation, with  an  increase  of  $14,600 and  a  decrease
of $18,156,200,  respectively.   The decrease  reflects  completion by  the  States
of major new  regulations  for hydrocarbon control;  concentration of enforcement
monitoring efforts  on the  most serious  violators  1n  nonattalrwient  areas;  and
reduction of  existing monitoring  to minimize  overlapping  sites  and  in  areas
which are In attainment of ambient standards.

Program Description

     This subactlvlty provides financial  support to  State and local air pollution
control agencies, including Indian  tribes, for the prevention, abatement,  and con-
trol of air pollution.  Its prime objective  is to support the development and  Im-
plementation of effective State  and local  programs for the  attainment and mainte-
nance of the National  Ambient Air Quality Standards,  in accordance with  provisions
of the Clean Air Act.

     Grants assistance to  control  agencies  which have  major role in  developing
and carrying  out  these  programs,  constitutes  the  major  form  of  EPA  resource
assistance.  Grants  assistance  is  supplemented  by  the training  of  State  and
local air pollution personnel and  the  provision of services  of contractors  for
specific tasks  identified  by  the  States  and  localities.   Grant assistance sup-
ports the basic  programs  of  State and  local  control  agencies  in  carrying  out
their role under the Clean Air Act, Including the development of State Implementa-
tion Plans; enforcement of  source emission  regulations and  requirements;  review
and permitting  of new sources;  and  the  monitoring  of  ambient air quality.   In
addition,  these funds  promote  the assumption  of environmental  responsibilities
including the prevention of significant deterioration  program.

     Control Agency Resource Supplementation — Under  the Clean Air Act,  the con-
trol of air pollution at its source is primarily the  responsibility of  State  and
local governments.  States, in  cooperation  with local  agencies, are responsible
under the Act  for developing and  implementing programs  to  attain  and  maintain
the national ambient air quality standards.   EPA grant assistance partially  funds
the costs for the operation and  continued efforts of these  State and local  agency
programs in meeting these responsibilities.

     Training — Resource assistance is further  supplemented  by  the provision  of
training in specialized areas of air pollution control.  Since  July 1,  1976,  the
EPA Air Pollution Training  Institute at  Research Triangle Park, North  Carolina,
has been operated under contract.  New courses  are  developed as  needed,  instruc-
tion manuals and materials are revised  and updated,  and manuals  and instructional
materials are provided to  university  training centers.  A small  EPA staff  monitors
the contracts, maintains liaison with Regional  offices  and State and local  agen-
cies, assesses changing  training requirenents, and ensures that those requirenents
are met.  The EPA  staff  also  works «dth university centers  to develop State  and
local self-sufficieny in training  by  offering courses at area  training  centers.
                                    A-93

-------
CONTROL AGENCY RESOURCE SUPPLEMENTATION

1981 Accomplishments

     In 1981  the Agency  obligated  589,524,400  for  this  program,  all  in  the
Abatement, Control,  and  Compliance  appropriation.   Major air  management  efforts
included continued emphasis  on  the  development and implementation  of  strategies
and programs  for the  attainment of  the ozone  and  carbon monoxide  standards,
including inspection and  maintenance,  transportation  controls,  and the  control
of additional stationary  source  emissions of volatile organic chemicals.   Enforce-
ment efforts  focused  on  major  source  compliance,  State development of  programs
for the review and  permitting  of new  sources  for  the prevention of significant
deterioration (PSD),  and the  development  of  motor  vehicle  antitampering/fuel
switching surveillance programs.   State  and  local  monitoring  efforts  produced
major progress in establishing  the  National  Air Monitoring  System Network  and
preparing necessary  data  bases  for the  1982  strategies  suhmittals  for  major
urban ozone nonattainment areas.

1982 Explanation  of  Changes from January Budget Estimate

                   January            March             Current
                   Estimate           Estimate          Estimate

                $87,734,900        587,734,900       $87,734,900

     There was no change  to this activity.

1982 Program

    In 1982, the Agency  allocated a total  of $87,734,900 to  this program in the
Abatement, Control  and Compliance appropriation.   Essential  air  management  func-
tions are being maintained for the development of required submittals of  strategies
for the post-1982 attainment of standards  for 03  and  CO.   Enforcement  efforts
continue to focus on major source compliance, review and permitting of new sources
(including PSD),  as  well  as enforcement of delegated responsibility  for hazardous
emissions (NESHAPS)  and  new source  performance standards  (NSPS)   .   Monitoring
programs provide   for  the maintenance  of current  ambient  monitoring  activities
and for progress  in  the completion of the full  State/local  air monitoring system
network.  Among  other efforts,  the  development   and   implementation  of  in-use
vehicle control programs  are proceeding.  Regulatory reforms  are being  incorpo-
rated into  current  State regulation  development   efforts.   In  addition,  some
States are beginning to develop  programs for assessing and regulating air toxics,
including special efforts to optimize current regulatory programs.

1983 Program Request

     The Agency  requests  a  total  of  $69,954,700  for  this program, a  decrease
of $17,780,200 from  1982  for  the Abatement, Control, and Compliance  appropriation.
State and local air management  efforts  will  focus  principally  on the development
and implementation  of specific  regulatory  programs  outlined in  the  post-1982
attainment strategy  plan   submissions for  ozone  and carbon monoxide. Air manage-
ment efforts will also focus on  the coordination  of data  base development  and
analysis of  strategy  alternatives  necessary for attaining  the revised  NAAQS  for
particulates and  on the  continued development  and implementation  of  regulatory
reforms for  the  "bubbling"  of  source  emissions.   State and local enforcement
efforts will  focus  on  the surveillance  of  major  stationary  sources and  on  the
effective implementation   of  programs   for  the  review and  permitting  of  new
sources.  State  and local air  monitoring efforts   will  focus  on  the  continued
operation and quality  assurance  of  the NAMS network and  the  preparation  of data
bases necessary for  the development  of regulatory  strategies for  revised particu-
lates standards and  air toxics.
                                    A-94

-------
TRAINING

1981 Ac cofflp11s hmgnts

     In 1981,  ttie  Agency  obligated  $1,207,200  for  this  program,  of  which
5219,300 was  for Salaries and Expenses  and  $987,900 was  for  Abatement,  Control
and Compliance.  Seventy-four training courses were conducted covering 17 subject
areas for 2,000  students  and graduate traineeships were  provided  for 22 control
agency employees.   In addition,  five workshops  were conducted  in three subject
area; for  212  students,  three  courses  were revised  and  one new  course  was
developed.

1982^ Explanation of Changes from January Budget Estimate

                   January            March            Current
                   Estimate           Estimate         Estimate

                 SI,042,800         $1,042,800       $1,223,500

     The net  increase  of  +$180,700  results from  several  actions,  as  follows:

     "  Reprogramnn'ng.   (-$143,800)  During the  development   of  the  operating
     plan, several  miscellaneous  reprogrammings,  which  are  not   reportable  to
     Congress, were  made  to  this  activity  and  resulted  in  a  net  decrease  of
     -5143,800.

     -  Congressional Actions.   (+$324,500)   A  reduction of -$148,800  was taken
     against the  March  estimate reflecting  the September  12$  reduction  to  the
     Abatement, Control  and  Compliance  appropriation,   The  Congressional  ear-
     marked add-on  to this  activity  is  $500,000 applied  against  the Abatement,
     Control and Compliance appropriation.

        An additional change  of -526,700 was applied to the Salaries and Expenses
     ($11,500) and Abatement, Control and Compliance ($15,200) appropriations to
     meet Congressionally mandated appropriation levels.

1982 Program

     In 1982, the  Agency  is  allocating  a total  of  $1,223,500 and 4.0 permanent
workyears for this  program,  of which $223,500  is  for  Salaries  and Expenses  and
SI,000,000 is  for extramural purposes in  the Abatement,  Control  and Compliance
appropriation.  Twenty-eight  training courses are  being conducted  for  approxi-
mately 980  students  and  graduate  traineeships  for  20 control  agency  employees
are continuing.  Training  is being provided in  seven  area  training  centers  and
more use is being made  of self-instructional  and correspondence courses.

1983 Program Request

    The Agency requests a total  of $862,100  and  4.0  permanent  workyears for this
program, of  which  $238,100  is  for the  Salaries  and Expenses  appropriation  and
$624,000 is  for  the  Abatement,  Control  and  Compliance  appropriation.  This is an
increase of $14,600  and decrease  of  $376,000 respectively, from  1982.   The  in-
crease reflects  Increased  Salaries and  Expenses to  fund  personnel  costs and  the
decrease reflects  reduced development of  new direct training  courses.   Courses
will only  be conducted in  the  seven area  training  centers.   The  Agency  will
develop seven correspondence and  self instructional  courses for eventual  use by
about 5,000 students.
                                      A-95

-------
                                                                 AIR

                                                 Air Quality  Management  Implementation
                                     ACTUAL    JANUARY     MARCH
                                      1981     ESTIMATE   ESTIMATE
                                                1982       1982
                                                                                    CURRENT   ESTIMATE  INCREASE +
                                                                                    ESTIMATE    1983   DECREASE -
                                                                                      1982            1983 VS 1982
                PROGRAM
                                                             (DOLLARS  IN THOUSANDS)
I
JO
tn
Air Quality Management
Implementation
 Salaries 4 Expenses
 Abatement Control  4
 Compliance
                                                  $9,526.1   $10,462.3    $9,184.3    $9,564.4   $8,791.5   -$772.9
                                                    $222.0    $2,242.9      $42.9     $116.5      $34.3    -$82.2
                TOTAL:
                 Salaries I Expenses
                 Abatement Control  &
                 Compliance

                Air Quality Management TOTAL
                Implementation
                                  $9,526.1  $10,462.3   $9,184.3   $9,564.4   $8,791.5    -$772.9
                                    $222.0   $2,242.9      $42.9     $116.5      $34.3     -$82.2
                                  $9,748.1  $12,705.2   $9,227.2   $9,680.9   $8,825.8    -$855.1
                PERMANENT FULL-TIME WQRKYEARS
                Air Quality Management               277.4      311.0
                Implementation

                TOTAL PERMANENT HORKYEARS             277.4      311.0
                                                           275.0      261.4


                                                           275.0      261.4
246.5     -14.9


246.5     -14.9

-------
                                                  AIR

                                 Air Quality Managanent Implementation

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE  +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE  -
                                                1982       1982       1982            1983  VS 1982
TOTAL WORKYEARS
Air Quality Management              308.3      337.8      298.8      284.6      266.8     -17.8
Implementation


TOTAL WORKlfEARS                     308.3      337.8      298.8      284.6      266.8     -17.8

-------
                                     AIR

                    Air Quality Management Implementation

BudgetRequest

    The Agency requests  a total  of  $8,825,800  and  246.5  permanent workyears,  a
decrease of 5855,100  and  14.9 permanent workyears  from 1982.   Included  in  this
total is 58,791,500  for  Salaries  and  Expenses and $34,300  for the  Abatement,
Control  and Compliance appropriation, a decrease of  $772,900 and $82,200,  respec*
tively.   These  reductions  reflect   streamlining  of the  review  and   rulemaking
activities for State implementation plans.

Program Description

    This subactivity  provides resources  for  the  operation and  maintenance  of
an air management  program in  each  of  the  Agency's ten  Regional  Offices.   The
Regional  air management program,  in  partnership with State  and local  air pollution
control  agencies, serves  to meet  the regulatory requirements specified  in Sections
110, Part C  and Part D  of the Clean  Air Act and EPA implementing regulations.
The air management  program provides  policy guidance  and technical consultation
to States in the development  and implementation  of  the strategies  and  regulatory
programs for  the  attainment  and maintenance  of  National   Ambient  Air  Quality
Standards (NAAQS).  It also  conducts the necessary review  and coordination  for
approval  of State-submitted strategies.  The Agency  negotiates  air  program grants
and provides oversight of State and local progress in  developing and implementing
regulatory programs for standards attainment.

     Major efforts  are  necessary  to provide  timely  and effective guidance  to
States in meeting the  commitments made  in strategy submissions for the  development
and implementation  of  multiple regulatory programs essential  to the  attainment
of standards.  Similar efforts will have to be  provided for  State development  of
strategies for other  revisions to  air quality standards  required by the  Act  and
for the development  of  programs  for  implementing  regulatory reforms,  including
controlled trading options,

     The 1977 Amendments  to the Act  also impose major new requirements  on  the
process for reviewing  and permitting  new  sources to assure that  they will  not
cause deterioration  of  air  quality  in  areas  attaining  the  National  Ambient
Quality Standards  (NAAQS),  or  that  will  not delay  attainment  or  aggravate
current problems  in  areas not yet  attaining  the NAAQS.   Effective guidance  to
States assuming full  responsibility  for these  review and permitting requirements
involves major  Regional  efforts.   Guidance to  States  in  the determination  of
best available  emission   control  technology,   analysis  of   air  quality  impact,
selective source siting,  and  emission  trade-off analyses  integral  to  this review
process is required.   Oversight  of  the  State  new source activities is provided
as well.

AIR QUALITY MANAGEMENT IMPLEMENTATION

1981 Accompli shments

     In 1981,  the  Agency  obligated  $9,748,100  for  this  program,   of  which
$9,526,100 was for  Salaries and Expenses and $222,000 was for  Abatement,  Control
Compliance.  The  contract  funds  were  for the  salaries of  National  Oceanic  and
Atmospheric Administration meteorologists  who  provide modeling support  to  EPA.
Emphasis focused  especially  on  follow-up of  State implementation  of the  1979
strategy submissions  for  the development of  regulatory  programs for  stationary
source volatile  organics   and  automobile inspection/maintenance,  development  of
data bases for 1982 ozone/CO strategies for urban areas with post-1982  attainment
extensions, and State assumption of  new  source  review/ prevention of  significant
deterioration programs.  The  Regions provide   follow-up  on   strategy  commitments
and schedules  for  non-traditional  particulate  and  fugitive  dust  studies  and
                                    A-98

-------
analyses.  The Regions  provided extensive  guidance  in  formulating  regulations
consistent with  available  control  technology to  states  developing  additional
controls on  volatile  organic  compounds (VOC) emissions.   In addition,  guidance
and consultation were provided to States and applicants in  developing and review-
ing applications for  use  of  source  "bubbles" facilitating  emission trade-offs.

1982 Explanation of Chajiges from Janujry Budget Estimate

                   January             March            Current
                   Estimate           Estimate        Estimate

                  $12,705,200         $9,227,200        $9,680,900

     The net decrease of -$3,024,300 results from  several  actions, as  follows:

     ~  January - March.   {-$3,478,000)   This   change   represented  a  decrease
     of $3,478,000from the January budget,  of which $1,278,000 was  for  Salaries
     and Expenses  and $2,200,000  was for  Abatement,  Control  and  Compliance.
     The decrease reflected simplified SIP review procedures.

     -  Reprogramnrfng.  (+5543,300)   During the development of the operating  plan,
     several mi seel laneous  reprogrammings,  which  are not reportable  to Congress,
     were made to  this  activity and resulted in  a net increase  of  +$543,300.

     -  Congressional  Actions.  (-$185,100)   An additional  reduction of -$185,100
     was applied to the Salaries and Expenses appropriation  to meet Congressio-
     nal ly mandated appropriation levels.

     "  Transfer Authorlty. (+$95,500)  The net increase applied  to this  activity
     includes a decrease of -$11,600 to Abatement,  Control and Compliance and an
     increase of +$107,100  to Salaries and  Expenses  for  printing  In Region  I.

1982 Program

     In 1982, the Agency is allocating a total of S9,680,900 and  261.4 permanent
workyears for this program, of which $9,564,400 Is  for Salaries  and Expenses  and
2116,500 is for extramural  purposes  under the Abatement, Control and  Compliance
appropriation.   Contract resources  are being provided  to  support  modeling  and
special analyses for regulatory reform proposals,  S02 emission limitation  changes,
and toxic  air  emissions.   Regional   air management efforts  focus  on  the review
and approval  of  State  regulations  for  control   of  additional  sources of  VOC
emissions, completion of remaining corrections to deficient  1979 State Implemen-
tation Plan submissions, approval of  revised  regulatory  strategies  for major  S02
sources, attainment strategies for NAAQS for lead, and for State developed generic
programs for implementing  controlled trading options,  including source bubbles
and emission banking.

     Guidance is being provided to States developing  automotive  inspection/main-
tenance (I/M)  programs  and preparing post-1982  ozone/CO attainment strategies.
The Agency  1s  continuing  efforts fostering  the delegation  of  PSD programs  to
States and is  continuing direct  involvement in  the review of new  source permit-
ting for  nondelegated States.  Air  grants  negotiations  and  evaluation  of  State
and local  agency  performance  in  meeting   grant  commitments   are  continuing.

1983 Program Request

     The Agency requests a total of  $8,825,800 and  246.$ permanent  work/ears  for
this progran,  of  which $8,791,500 is for the Salaries and  Expenses  appropriation
and 534,300 1s for the Abatement, Control  and Compliance  appropriation.
                                      A-99

-------
     Traditional  review and  rulemaking  activities  for SIPs  will  continue to  be
streamlined.  A1r  management  functions  which  have  received  little  attention
because of extensive review and  approval efforts, will be Implemented or expanded,
including more intensive delegation  support  to  States and review/audit  of State
regulatory and new source programs.   Most  review  and,  If  necessary,  approval
actions will involve  only  the post-1982 attainment strategies submitted  in  late
1982 and  revisions for  isolated major  point  sources,  including  specific   S.Og
sources incorporating  averaging  times  for establishing emission  limitations  and
verifying source  compliance.

     Guidance will be provided to States in developing and implementing regulatory
programs specified  in  the  post-1982  attainment  strategies  [e.g.,  additional
stationary source, VOC controls, voluntary or mandatory I/M programs); procedures
for conducting the  engineering  and  modeling analyses  necessary  for permitting
new sources;  programs  for  assessing and  regulating  air toxics;  programs   for
developing needed  data  bases for new  MAAQS  for parti dilates;  and  programs  for
furthering regulatory reform, including  programs for controlled trading.  Improved
State audit/review  programs  will be developed  and implemented to  assess State
capabilities, consistency,  and  progress in  carrying  our  regulatory  strategies/
programs.

     The Regions   will  initiate  efforts to  actively  identify  and  assess inter-
state problems and issues which effect  regulatory  program's  progress  and  the
permitting of new  sources  in interstate areas.  Limited  resources are maintained
to retain a  more  direct EPA  role in new source permitting where  States have  not
assumed full  responsibilities,  and  to take  faster  action on  regulatory program
inadequacies evident  through program  audits and  remedial  measure development.
                                      A-100

-------
                                                  AIR

                                Trends Monitoring 4 Progress Assessment

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982

                                             (DOLLARS IN THOUSANDS)
PROGRAM
Ambient Air Quality
Monitoring
 Salaries 4 Expenses
 Abatement Control 8
 Compliance

Air Quality &
Emissions Data
Analysis 8 Progress
.Assessment
 Salaries & Expenses
 Abatement Control 8
 Compliance
           $2,437.4   $2,945.3   $2,925.1   $2,763.1   $2,997.8    $234.7
             $105.6     $310.5     $310.5     $163.4     $248.4     $85.0
           $1,487.0   $1,604.8   $1,604.8   $1,550.8   $1,427.5   -$123.3
             $326.1     $200.0     $192.3     $149.2     $203,9     $54.7
TOTAL:
 Salaries 8 Expenses
 Abatement Control S
 Compliance

Trends Monitoring &
Progress Assessment
TOTAL
           $3,924.4   $4,550.1   $4,529.9   $4,313.9   $4,425.3    $111.4
             $431.7     $510.5     $502.8     $312.6     $452.3    $139.7
$4,356.1   $5,060.6   $5,032.7   $4,626.5   $4,877.6    $251.1

-------
                                                  AIR

                                Trends Monitoring 8 Progress Assessment

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE  t
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE  -
                                                1982       1982       1982            1983  VS  1982
PERMANENT FULL-TIME UORKYEARS



Ambient Air Quality                    75.4       82.1       82.1       80.2       82.1        1.9
Monitoring

Air Quality 8                          32.9       34.2       34.2       32.2       29.9       -2.3
Emissions Data
Analysis 8 Progress
Assessment

TOTAL PERMANENT WORKYEARS             108.3      116.3      116.3      112.4      112.0        -.4


TOTAL HORKYEARS
Ambient Air Quality                    82.4       89.2       89.2       86.9       87.B        .9
Monitoring

A1r Quality 8                          38.6       38.8       38.8       36.8       34,0      -2.8
Emissions Data
Analysis 8 Progress
Assessment

TOTAL WORKYEARS                       121.0      128.0      128.0      123.7      121.8      -1.9

-------
                                     AIR

                  Trends Monitoring  and Progress Assessment

Budget Request

    The Agency requests a total  of  $4,877,600  and 112.0 permanent  workyears  for
1933, an  increase of 5251,100  and   a  decrease  of  .4  permanent  workyears  from
1982. Included  in  this total   is  54,425,300  for  the  Salaries  and  Expenses
appropriation and $452,300  for the  Abatement,  Control  and Compliance  appropria-
tion, an  increase of Sill,400 and $139,700, respectively.  The  increase  reflects
additional national   Air Monitoring Stations   (MAMS)  monitors  evaluations  and
continued Implementation of  the new  air data system.


Program Description

    This  subactivity covers  work   related  to   monitoring  ambient  air  quality,
determining source  emissions,  analyzing  their  relationships  and assessing  the
progress made toward the attainment  of  environmental  goals.

     Ambient Air Quality Monitoring  —  Activity  in this program includes:  1) EPA's
management overvi ew oT state ambient air quality monitoring  networks,  associated
laboratory and field quality assurance activities and  the implementation  of  air
monitoring strategies as delineated  in  the  air  monitoring regulations  promulgated
in 1978 [40 CFR 58); 2} the coordination of  regional  and State field  Investigation
activities for collecting ambient air quality samples for subsequent sample analy-
sis and related quality control; 3)  reviewing of source  emissions data,  and 4)  the
necessary management and coordination to  ensure timely  storage  and  validation of
data obtained.

     Air Quality and Ealssions  Data  Analysis and Progress Assessment;;  —  Major
activities include  national  coordination  of  regional  office.  State  and  local
ambient monitoring programs and  issuance of new/revised  regulatory requirements
and related technical  guidance;  active  oversight  and  auditing of the  National
Air Monitoring  Stations  to  ensure  continuing  conformance  with  all  regulatory
ambient standards.   Increased  attention  will   be  given  to  improving technical
decisions; operation of  computer systems  for  storing, retrieving  and analyzing
ambient air quality and  emission data; development and  implementation  of systems
to meet  user  requirewnts;  and  preparation  of trends  analyses and related  air
quality and emission progress  assessments  for   policy  evaluation  and  development
and to meet public information  needs.

AHBIE_HT AIR QjJALITY MDtllTORING

1J81 Accqmpl Ishments

     In 1981,  the  Agency   obligated  52,543,000 for  this   program,  of  which
32,437,400 was for Salaries and Expenses  and $105,600  was  for Abatement,  Control
and Compliance.   Contract  funds  supported  preparation  of air  quality profiles.
The Regions continued management overview of State monitoring programs, including
the evaluation and reriew of networks for  conformance to EPA regulations,  adequacy
in meeting data needs for trends assessment, compliance evaluation,  and SIP develop-
pnent and evaluation,

     EPA conducted quality assurance audits of State monitoring systems, coordina-
tion of  State data  quality  assessments,  and   validation  of all  HAMS  data  for
adequacy and  timeliness.  Programs  to validate State  and Local  Air  Monitoring
Stations  (SLAMS) data from  critical  sites were  initiated.   EPA provided coordina-
tion with States  to ensure  that emission  inventories  were  submitted  and  stored
in the  National  Emission and  Data  System  (NEDS)  and  provided  assistance  for
special air quality data collection  needed  for  SIP development.
                                      A-103

-------
1 982 Explanation of Changes from January Budget Estimate

                 January        March            Current
                 Estimate      Estimate     .    Estimate

              S3 ,255 ,800         $3,235,600       52,926,500

     The net decrease  of  -$329,300  results  from several actions,  as  follows:

     -  January - March.   (-520,200)   This   change  represented  a  decrease  of
     S 2 0 , i*o(J from the J a nu a ry budget all of which was  for Salaries and Expenses,
     and reflected reductions in travel  ceiling.

     -  ReDrogramming.  (-$150,900)  During the development of the operating plan,
     several  miscellaneous reprogrammings,  which are not  reportable  to Congress,
     were made  to  this activity and  resulted in  a net  decrease of  -$150,900.

     -  Congressional  Actions.   (-$160,800)  A reduction  of  -$69,700  was  taken
     agani st the March  estimate reflecting the  September 12%  reduction  to  the
     Abatement, Control and  Compliance appropriation.  This  reduction  reflects
     reduced funds for monitoring projects.   An  additional reduction of -$91,100
     was applied to the Salaries and Expenses  and appropriation  to meet Congres-
     sional^ mandated appropriation levels.

     -  Transfer Authority.   (+$2,600)  The  net increase applied  to this  activity
     includes a decrease of  -$26,600 to Abatement,  Control and  Compliance and an
     increase of +529,200 to Salaries and Expenses.
    In 1982, the  Agency  is allocating a  total  of 52,926,500 and  80.2  permanent
workyears for this program, of which 52,763,100 is  for  Salaries  and Expenses  and
5163,400 is for extramural  purposes  under the Abatement, Control  and  Compliance
appropriation.  Regional   offices  are  continuing  to evaluate  State  monitoring
networks, perform  quality  assurance  audits,  coordinate  State  inhalable  parti-
culate data activities, and validate and coordinate  storage  of air data  in  NEDS.
Evaluations for conforaance of SLAMS  monitoring  sites  located  in  primary  non-
attainment areas  and   for  energy  conversion  sources  are being  performed.   In
addition, quality  assurance audits  are  being  performed of  large  local  agency
monitoring systems.

1983 Program Request

     The Agency requests a  total  of  $3,246,200  and 82.1  permanent  workyears  for
this program, of  which 52,997,800 is  for  the  Salaries  and Expenses appropriation
and 5248,400  is  for the Abatement,  Control  and  Compliance  appropriation.   This
reflects an increase of $234,700 and $85,000, respectively, and reflects  increased
NAMS monitors evaluations  in 1983.  The Agency  will  provide  technical  assistance
in establishing  inhalable  particulates   (IP),  toxics,  and  acid  precipitation
monitoring networks.  The Agency will continue quality  assurance  audits-of  States
monitoring systems  and performance  audits  of  selected NAMS monitors  and  will
continue to  validate  and store air  quality and  emissions  data  1n  the  EPA data
banks.  Assistance will  be  provided  for the 1982  attainment  analyses and assess-
ments.  EPA will  review  selected  NAMS  and SLAMS  monitors and provide  SLAMS data
validation.

AIR QUALITY AND EMISSIONS DATA ANALYSIS AND PROGRESS ASSESSMENT

1 981 Accompl i shtnents

     In 1981,  the  Agency  obligated  31,813,100   for  this  program,   of   which
51,487,000 was for  Salaries and Expenses and $326,100 was  for Abatement, Control
and Compliance.   Contract  funds  supported  preparation  of  trends  reports  and
                                      A-104

-------
development of  the  new air  data system.   Emphasis  continued  on operation  and
updating of existing  air  data  systems, training and  guidance  of  systems  users,
and responses to requests from the public.  Support of EPA developed  data systems
was provided in 35 State and local  agencies.

     Efforts continued to develop revised  air monitoring regulations and operating
guidance.  Regulations for ambient lead monitoring were  promulgated.   Comprehen-
sive on-site  audits  of over 200 NAMS were conducted  to assess  compliance with
the regulations.   EPA prepared an annual  report and  other air  quality analyses
and statistical  reports.   Development  of  the  new  air  data  system  continued.

1982Explanationof Changes from January Budget  Estimate

                   January            March            Current
                   Estimate           Estimate         Estimate

                  51,804,800         $1,797,100        $1,700,000

     The net decrease of -5104,800 result  from the  following action:

     -  January-March.   (-$7,700)    This  change  represented  a  decrease   of
     S7,700 from  the  January  budget all  of  which  was   for Abatement,  Control
     and Compliance.

     -  Congressional  Acti ons.    (-597,100)   A  reduction of -$43,100 was  taken
     against the March  estimate reflecting the September  12% reduction to  the
     Abatement, Control and Compliance appropriation  resulting  In slower develop-
     ment of the  new  air  data   system.  An  additional  reduction  of -$54,000  was
     applied to the Salaries  and Expenses appropriation  to meet  Congressionally
     mandated appropriation levels.

1982 Program

     In 1982, the Agency  is  allocating a  total  of SI ,700,000  and 32.2 permanent
workyears for this program, of which $1,550,800 is for Salaries and  Expenses  and
5149,200 is for extramural purposes  under the Abatement, Control  and Compliance
appropriation.  All   major activities  are  continuing,  including  operation   of
existing air data systems, production of  the annual  report  and  other  statistical
analyses, national oversight of  State  and local  monitoring programs,  and evalua-
tions of NAMS  including on-site  audits.   In  addition,  the Agency is  providing
technical guidance  for  interfacing  modeling  and  monitoring, for network  design
and siting of toxic  pollutant monitors,  and evaluation  of SLAMS network compliance
with regulatory criteria.   Specifications for software and  data  base management
systems for the new air data system are being  developed.

1983 Program Request

    The Agency  requests a total  of  SI ,631,400  and  29.9  permanent workyears  for
this program, of  which $1,427,500 Is for  the  Salaries and Expenses appropriation
and S203.900  Is for the Abatement,  Control and Compliance appropriation.  This
represents a decrease  of  $123,300  and an  increase of  $54,700.  respectively,  and
reflects the  production  of   fewer  trends  analyses  and   decreased  efforts   in
evaluating selected lower priority  State  and  local  monitor-ing  efforts  and  a
slight increase  in  extramural   funds  to  implement  the  new  air data  system.
Operation of  existing  air data  systems and modification to accommodate  changes
in ambient  standards  will  continue, as  will  national  oversight of State  and
local monitoring programs.  To prepare for  future  monitoring of toxic pollutants
by States, a new program will  be Initiated  to develop  and  implement  criteria  for
characterizing urban air,  determining trends and emergency response,  and insuring
data validity.
                                       A-105

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                                  AIR

                                                     Stationary Source fnforcement
ACTUAL
 1981
                                               JANUARY
                                               ESTIMATE
                                                1982
                                                                           MARCH
                                                                          ESTIMATE
                                                                           1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
 1982            1983 VS 1982
                PROGRAM
                                                             (DOLLARS IN THOUSANDS)
a
ov
Stationary Source
Enforcement
 Salaries & Expenses
 Abatement Control 4
 Compliance

Stationary Source
Enforcement
Legal 4 Enforcement
Counsel
 •Abatement Control 4
 Compliance
                                                  $13,038.8 $17,145.8   $15,358.7  $14,232.9  $10,101.5 -$4,131.4
                                                   $8,141.5  $9,841.2    $9,091.2   $9,091.2   $5,019.1 -$4,072.1
                                                   $1,703.5
                      $700.0
 $700.0
-$700.0
                TOTAL:
                 Salaries t Expenses
                 Abatement Control  4
                 Compl lance

                Stationary Source       TOTAL
                Enforcement
                                  $13,038.8 $17,145.8   $15,358.7  $14,232.?  $10,101.5 -$4,131.4
                                   $9,845.0  $9,841.2    $9,791.2   $9,791.2   $5,019.1 -$4,772.1
                                  $22,883.8  $26,987.0  $25,149.9  $24,024.1  $15,120.6 -$8,903.5

-------
                                                  AIR

                                     Stationary Source Enforcement

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME HQRKYEARS
Stationary Source
Enforcement
392.7      497.5      456,3      409.2      273.4    -135.8
TOTAL PERMANENT WORKYEARS
392.7      497.5      456.3      409.2      273.4    -135.8
TOTAL WORKYEARS
Stationary Source
Enforcement
435.2      536.8      487.1      437.3      289.6    -147.7
TOTAL WORKYEARS
435.2      536.8      487.1      437.3      289.6    -147.7

-------
                                     AIR

                        Stationary Source Enforcement
BudgetRequest
     The Agency requests a total of $15,120,600 and 273.4 permanent  workyears  1n
1983, a decrease of $8,903,500  and  135.8  permanent workyears  from 1982.   Included
In this total Is $10,101,500 for Salaries  and Expenses and $5,019,100  for Abate-
ment, Control and Compliance, with  decreases  of  $4,131,400 and  $4,772,100 respec-
tively.  The reduction In Salaries and Expenses and permanent  workyears  for this
activity Is  attributable, in  part, to a reorganization shifting judicial  case
development and  legal  activities  to  the  new  Office  of Legal  and Enforcement
Counsel (OLEC), and to  a shift  away from direct Federal  enforcement toward greater
support of State efforts In these  activities.   The decrease 1n  extramural  funds
reflects anticipated Improvements  1n  State enforcement activities,  primarily  1n
the areas of Inspections  and compliance monitoring.

Program Description

     The stationary source  enforcement program  provides support to and  coordi-
nation with  State   and  local   air  pollution control  agencies  to  ensure  that
stationary sources achieve and maintain  compliance  with the requirements  of the
Clean Air Act, as amended  in 1977.

     Stationary Souree Enforcement—  Specific  statutory requirements of  concern
to this program include State  imp!ementatlon  Plans,  new  source  related  provisions
including permitting programs  and   New  Source  Performance  Standards,  National
Emission Standards for Hazardous Air Pollutants, and certain provisions  relating
to coal conversions under the Omnibus  Budget  Reconciliation Act.

     As a result  of State  and EPA actions,  approximately  ninety-three  percent
of the more  than 28,000  major  stationary  sources  have  achieved compliance  with
all applicable air quality limitations.  Although this  represents a significant
achievement, government efforts must  continue  to ensure that  remaining  sources
come into compliance with  present standards or any new or revised standards;  and,
that once controls  are installed,  compliance with  standards Is  maintained.  EPA
will continue  to  provide State  and  local  agencies with  technical  support  in
their efforts tn order to realize  this goal  and, where  appropriate,  Initiate its
own actions.

     Stationary Source EnforcementLegal  andEnforcement Counsel— This  program
element provides contract  funds to  support aT portion   of"  the  enforcement  data
system and to  assist In  case  development and training activities  related to Air
Quality Enforcement.

STATIOMARY SOURCE ENFORCEMENT

1981 Accomplishments

     In 1981,  the  Agency  obligated  $21,180,300  for  this program,   of  which
513,038,800 was  for Salaries  and   Expenses  and $8,141,500  was for  Abatement,
Control and  Compliance.   The   resources  Included  contract  support  for  enforce-
ment case support; compliance monitoring  and  field  surveillance;  data management;
and Regional studies.

     During 1981, the  States  and  EPA  continued their efforts to bring  sources
Into compliance  with  the provisions  of the  Clean Air  Act.   Also, the  Agency
began Implementation of the noncompllance penalty regulations  under  Section 120.
The Agency Implemented regulations under Section 119 of  the Act, relating to the
issuance of administrative orders to primary nonferrous  smelters  for the control
of sulfur oxide emissions.  This implementation of  Section 119 should  accelerate
                                    A-108

-------
the movement toward-compliance for the smelter Industry.  The  Stationary  Source
Enforcement program Is  providing  technical  and cost evaluations of  the  applica-
tions which are anticipated to be  completed by early 1982 under the Steel  Industry
Compliance Extension Act (SICEA) of 1981.

     Efforts to increase the usefulness, accessibility and quality  of Information
In the  compliance  data system were  highly  successful   in  1981.   Significant
achievements included assistance to the States  in  development of their own compli-
ance data systems and  Integrating them into the  nationwide network, and enhancement
of the capability  to  track the compliance status of  sources  utilizing  contlnous
emission monitors.

     Accomplishments in  1981  included  development  of  3  technical  workshops  to
enhance the  capabilities  of  State and local  programs (23  workshops were  pre-
sented to Regional, State  and local  agency  personnel),  development of 6 manuals,
and provision  of  assistance  to   2  additional  State  compliance  data  systems
(bringing the total to 20).  During 1981, EPA  referred  52  actions  to the Depart-
ment of Justice, issued 65  administrative orders, and conducted 3,475  inspections.

1982 Explanation of Changes from January Budget Estimate

                   January            March            Current
                   Estimate           Estimate         Estimate

                S26.987.000        $24,449,900        $23,324,100

     The net decrease  of -$3,662,900 results  from  several actions,  as  follows:

     - January - March.   (-$1,045,300)   This  change  represented  a  decrease  of
     SI,045,300 from  the  January  budget,  all  of  which  was  for  Salaries  and
     Expenses.   As a  result of this decrease,  we relied  more heavily  on  volun-
     tary source  data  to  obtain  experience  with  utilization  of  continuous
     emission monitoring techniques, in the  development of a long-term  national
     continuous compliance strategy during 1982.

     ~  Reorganization.  (-$1,491,800)   Resources totalling $791,000 were moved to
     Technical  support-Office of Legal  and Enforcement Counsel  (National  Enforce-
     ment Investigations Center -  NEIC).   The  functions  supported by these  re-
     sources remain the  same;  the new  program element  for NEIC  was  created,  (a)
     so that their resources could be more  readily  Identified  and, (b)  organiza-
     tionally, the center  now falls under  the responsibility  of  the Office  of
     Legal  and  Enforcement Counsel.   As  a  result  of an agency  restructuring
     these resources were  later moved to the Interdisciplinary  program  under  one
     program element.   This reflects  the consolidation of these similar activities
     providing quick  technical  response   In  emergency  situations.   Resources
     totalling 5700,000 were moved to support case development and system develop-
     ment activities.

     -  Reprogranimlng.  (-$154,800) .During the  development of the operating plan,
     several mi seen aneous reprogramnrings, which are not  reportable  to  Congress,
     were made  to  this activity  and  resulted  in a net  decreade  of  -$154,800.

     "  Congressiona^  .-fet'Ums.  (-$1,026,900)   A reduction  of  -$2,035,900  was
     taken against theMarchestimate  reflecting  the September  12%  reduction  to
     the Abatement, Control and  Compliance' appropriation.   It was added  back
     (+$2,035,900) by  Congress  In final  action on  the 1982 Appropriation  Bill.
     An additional  reduction  of  -SI,026,900  was applied  to the Salaries  and
     Expenses appropriation to meet Congressional ly  mandated appropriation
     levels.

     *  Transfer Authority.  (+$55,900)  The net  change applied to this  activity
     is made up of an  Increase of +$55,900 to Salaries and Expenses for essential
     operating  costs.
                                     A-109

-------
1982 Program

     The Agency Is allocating a total of $23,324,100 and 409.2 permanent workyears
for this program  In 1982,  of  which $14,232,900  is for Salaries and  Expenses and
$9,091,200 Is for extramural purposes under the Abatement, Control, and Compliance
appropriation,  The extramural funds are being used for enforcement case support;
compliance monitoring and  field  surveillance; Regional data management  support;
and Regional Industrial, technical  and economic studies.

     In 1982, the Agency  will  be  refocuslng the direction of  this program  to
further ensure that  State and local  air pollution  control  programs assume the
primary role  In  ensuring that significant  sources of air  pollution are  bought
into compliance, and that  sources  maintain  such compliance.  EPA will work with
the State  and local  programs to  enhance their  technical  capabilities  through
expansion of its inspection workshop program,  assisting the  States in development
of continuous compliance pilot programs, and through providing  limited assistance
in specific cases.

     During 1982, the Section 120  noncompllance penalty program will  continue  to
be implemented, as will  the primary nonferrous  smelter order (NSO)  program under
Section 119 of  the Clean  Air  Act.  Since initial  NSOs may extend  only  through
January 1, 1983,  it  will be necessary  to begin development of second  round NSO
regulations during  1982  to establish   the  regulatory framework  for  compliance
extensions until  January 1, 1988, as provided  in the Act.

     The Agency will  continue to  encourage delegation  of responsibility  of the
PSD program and  enforcement  of  NSPS   and  NESHAPS  regulations   to  the  States.
Enforcement of  NESHAPS   regulations  continues  to  be a  high  priority  of this
program.

    EPA must  continue  to  ensure  that  new  sources  are  constructed  in  accord-
ance with  applicable  environmental requirements  and will  continue  to  expedite
issuance of energy-related PSD  permits.   In  addition,   certain  existing  power
plants having the  technical  capability to  use coal  can certify that they are
eligible to receive an  order requiring them  to convert under provisions  of the
Omnibus Budget  and Reconciliation Act of 1981.   EPA  will   provide quick and
thorough responses In  these situations,  Including issuance of  Section 113 (d)
(5) delayed compliance orders  in  appropriate cases.

      Program accomplishments  during  1982 will  also  Include  providing  assist-
ance to 55  State enforcement actions,  developing 3  new  technical  workshops  to
enhance the capabilities  of State  and  local  programs  (with  30   workshops  being
presented to Regional, State and local  personnel), development or implementation
of 2 continuous  compliance pilot  programs, development of 4  manuals for  State
and local   programs, and providing assistance  to  4  additional  State  compliance
data systems.   During  1982,  EPA will  issue  65 administrative orders, and con-
duct 1,825 inspections.

1983 Program Request

     The Agency requests  a total  of  $15,120,600   and  273.4 permanent  workyears
for this program,  of  which $10,101,500 is for  the Salaries and  Expenses  appro-
priation and $5,019,100  Is  for the Abatement, Control and  Compliance appropria-
tion.

     The major focus  of the  Stationary Source  Enforcement program  will  be the
effective development and  Implementation  of the Agency's  policy  and  guidance  to
encourage greater  reliance  on State and  local  agencies  for  enforcement of air
quality regulations,  and  on   significant  violations  in  nonatta 1 nment   areas.
                                      A-110

-------
     There will  also be  an increased effort  for building  the technical  capa-
bilities of  State  and  local   programs.   This  will   include  development  and
presentation of  technical  workshops, continued  emphasis on ensuring  continuous
compliance through  further  development  of the  State  pilot program effort  begun
in 1982, and  evaluation  of  State compliance  procedures and  follow-up  support.
EPA will be  developing and  Implementing  a general audit  program for the  State
and local  programs  to  track progress  towards attainment  of  the  goals of  the
Clean Air  Act  and  to  identify  areas where additional  enhancement of  technical
expertise may be required.

     The stationary  source  enforcement  program will  continue  to  provide assist-
ance in  selected  judicial referrals, consent  decrees,  Section 120 actions;  and
will issue administrative  orders to  violators as necessary.   In addition,  the
program will  continue  to review and manage  the Compliance Data System  (COS),
provide contractor  assistance  to  State and  Regional   enforcement  efforts,  and
make applicability determinations under  the NSPS and  NESHAP's.

     EPA will   continue  to   conduct   Inspections,  monitor  enforcement  actions,
issue waivers  and  permits,  make  noncompliance penalty determinations, and  bring
enforcement actions  In environmentally  significant  cases where States cannot or
will not take  such actions, despite  EPA  effort.   To  encourage States to  assume
primary responsibility, EPA will provide limited direct  case assistance  to  State
enforcement efforts when requested.   EPA will  also, as  necessary,  review  perform-
ance tests, evaluate continuous  emission monitoring programs, and  conduct inspec-
tions of significant sources located  in  nonattafnment areas on  a selective basis.

     Other program  accomplishments in 1983 will include providing assistance to
110 State enforcement actions, development of 5 new technical workshops  to enhance
the capabilities of  State and local  programs  (with 40 workshops  being presented
to Regional,  State  and  local personnel),  development  of 4 manuals for State  and
local  programs,  and providing assistance  to  5 State  compliance data  systems.
During 1983,  the enforcement program  will develop in conjunction  with the  Office
of Legal and  Enforcement counsel, civil  and  criminal  referrals.  In addition,
the program will conduct  a  projected 1835 inspections.  The issuance of admini-
strative orders 1s expected  to  triple (190 orders)  in  1983.

STAJ^                           AMDI  ENFORCEMENT COUNSEL

1981 Accomplishments

     In 1981,  the  Agency  obligated  SI ,703,500 in Abatement, Control and Compli-
ance funds to  provide support to  the  enforcement docket system, case development,
and training efforts.

1982 Explanation of Changes  from  January Budget Estimate

                   January            March            Current
                   Estimate            Estimate         Estimate


                                      $700,000         5700,000

     The net Increase  of +$700,000   results  from several  actions,  as  follows:

     "  Reorganization.   (+$700,000)   Resources totalling  +$700,000  were  moved
     from this newly establ1 shed  office  to support case development and systems
     systems development activities.   The functions supported  by  these resources
     remain the  same;   the  new  program  element for  the  National  Enforcement
     Investigation Center was  created,  (a)  so that  their resources  could  be
     more readily  identified  and, (b)  organizationally,  the   center  now  falls
     under the responsibility  of the Office  of  Legal  and Enforcement  Counsel.
                                     A-lll

-------
1982 Program
     In 1982, the Agency is allocating $700,000 in  Abatement,  Control and  Compli-
ance funds to provide support to the enforcement docket  system, case development,
and training efforts.
1983Program Request
     The Agency requests no  funds  for this  program element  in 1983.  Development
of the docket system has been  completed and the case development functions  will
be centralized and  carried  out by the  Office  of Legal  and Enforcement Counsel.
                                     A-112

-------
                                                   AIR

                                        Mobile Source Enforcement

                                      ACTUAL    JANUARY     MARCH
                                       1981      ESTIMATE    ESTIMATE
                                                 1982       1982
                                             CURRENT   ESTIMATE INCREASE +
                                             ESTIMATE    1983   DECREASE -
                                              1982            1983 VS 1982
 PROGRAM
                                              (DOLLARS IN  THOUSANDS)
 Mobile Source Enforcement
  Salaries 4 Expenses
  Abatement Control  £
  Compliance
           $4,403.0   $4,211.7   $3,690.6   $3,959.6   $3,522,6   -$437.0
           $2,199.8   $2,482.6   $2,482.6     $955.6   $1,896.5    $940.9
 TOTAL:
  Salaries I Expenses
  Abatement Control  A
  Compliance

•Mobile Source
 Enforcement
TOTAL
           $4,403.0   $4,211.7   $3,690.6   $3,959.6   $3,522.6   -$437.0
           $2,199.8   $2,482.6   $2,482.6     $955.6   $1,896.5    $940.9
$6,602.8   $6,694.3   $6,173.2   $4,915.2   $5,419.1    $503.9
 PERMANENT FULL-TIME  HORKVEARS
 Mobile Source Enforcement
              107.8
              110.6
97.0
87.0
56.4
-30.6

-------
*•
                                                                 AIR
                                                      Mobile Source Enforcement
                                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE + .
                                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                               1982       1982       1982            1983 VS 1982
               TOTAL PERMANENT WORKYEARS              107.8      110.6       97.0       87.0       56.4     -30.6

               TOTAL WORKVEARS
I
               Mobile  Source Enforcement             148,2      143.2      127,7      117.7       74.8     -42.9
               TOTAL HORKyEARS                       148.2      143.2      127.7      117.7       74.8     -42.9

-------
                                     AIR

                          Mobile Source Enforcement


Budget Request

     The Agency requests  a  total  of $5,419,100 and 56.4 permanent woricyears  for
1983. an increase  of $503,900  and  a decrease of  30.6  permanent workyears  from
1982.  Included  in  this  total  1s  $3,522,600  for Salaries  and  Expenses  and
$1,896,500 for Abatement,  Control  and  Compliance, with a  decrease of  $437,000
and an Increase of $940,900  respectively.  The decrease  1n  Salaries and Expenses
stems from economies  1n mobile source testing programs, reduced  direct Involvement
through support  of  State  efforts  to  prevent   fuel   switching/tampering,   and
transfer of resources associated with case  development/legal  activities to  the
Office of Legal and  Enforcement Counsel.   The Increase  1n extramural funds will
Increase activities  1n  the  areas  of  fuels  Inspections,   training for State
personnel, and support for the recal 1  program.

Program Description

     The mobile source enforcement  program  1s directed primarily towards  achiev-
ing compliance with  motor  vehicle  emission  standards  and  fuel  regulations  as
required by the  Clean  Air  Act.   The  major  goals and  objectives  are  to  (1)
assure that new vehicles  meet  emission  standards;  (2)  assure that vehicles meet
emission standards In  use;  (3) assure  that emission  control   systems  are  not
removed or  rendered  Inoperative;  (4)  assure that harmful  additives   are  not
present 1n gasoline;  (5)  administer fuel  and emission waivers;  and  (6) administer
the statutory  emission warranties.

MOBILE SOURCE  ENFORCEMENT

1981 Accomplishments

     In 1981,   the Agency  obligated  $6,602,800  for   this  program,   of which
$4,403,000 was for Salaries and  Expenses and $2,199,800 was for  Abatement,  Control
and Compliance.  The Agency  used  these  funds for  recall emission testing, fuels
Inspections and fuel  switching  observations,  field Inspections  for  tampering  and
fuel switching, data management, and  assistance  to States for  unleaded  gasoline
inspections.  In   1981,  this  program  Issued  twenty-seven  selective  enforcement
audit test orders  to  manufacturers  to  test assembly line  vehicles.    The Selective
Enforcement Audit (SEA)  program assures that  new vehicles on the production line
are in compliance with emission requirements.

     In support of the  in-use  compliance program, the  Agency carried  out  700
surveillance/confirmatory  tests of vehicles 1n-use  were  conducted and thirty-five
recall Investigations In  1981.  This  activity resulted  In  two Agency  Initiated
recalls Involving 712,000 vehicles and  two  recalls involving  546,000  vehicles
which were voluntarily Initiated by  the automobile  Industry,

     The mobile source enforcement program enforced the tampering and fuel  switch-
Ing provisions by  performing 1225 Inspections of  new  car  dealerships,  fleets,
commercial  repair facilities,  and  service stations.   In  addition,  9,000 fuel
switching/tampering observations were  conducted  and  serve  as  & data  base  for
statistically  determining  the rate of fuel  switching/tampering  nationally and to
identify some  localized trends.

     The Agency also  conducted 25,000  fuels Inspections  to assure compliance with
unleaded gasoline  regulations, the Stage I vapor recovery, requirements and with
octane disclosure provisions.   Three  fuel waivers requirements were processed.
                                    A-115

-------
     Other accomplishments  in 1981  included the  completion  of warranty  regu-
lations, aftermarket parts  certification  regulations,  and a  public hearing  on
proposed revisions to the Import regulations.

1982ExplanationofChanges from January Budget Estimate

                   January            March            Current
                   Estimate           Estimate         Estimate

                 $6,694,300         $6,173,200       $4.915,200

     The net decrease  of -$1,779,100 results  from several actions, as  follows:

     " 
-------
     In 1982, we  are  beginning  to shift recall testing to the EPA  motor vehicle
laboratory In Ann Arbor, Michigan.  The Agency Is Increasing the number of recall
Investigations In 1982  over 1981  levels from  35  to 45 as  a result  of applying
statistical criteria to decision-making  which  allow fewer tests  to  be conducted
on a class of vehicles to determine 1n~use compliance with standards.

     Additional effort  Is  being  placed on  encouraging  State  participation  1n
field Inspections  to   reduce  automobile emissions  that  result   from  tampering,
fuel switching and Improper maintenance.

     Other major  activities 1n  1982 are  the  continuation  of SEA program  for
assembly line testing;  administering fuel  and  emission  waivers  (NOX and  CO);
conduct of fuels  Inspections; review of the  lead  phase-down  regulations; assist-
ance to States and  localities to  conduct unleaded fuels  Inspections;  and imple-
menting revisions to the Imports compliance program.

     The 1982  enforcement  activities  will  result  In 25 selective  enforcement
audit test orders; 45 recall Investigations;  635 confirmatory/surveillance tests;
1013 fleet tampering, fuel  switching Investigations  (new car dealerships, fleets,
commercial  repair facilities, and service  stations); 6,000 fuel switching obser-
vations; and 30 warranty Investigations.

1983 Program Request

     The Agency requests a  total  of $5,419,100 and 56.4  permanent  workyears  for
this program, of  which $3.522,600 1s  for the Salaries  and Expenses  appropriation
and SI,896,500  is  for the Abatement,  Control  and  Compliance  appropriation.
Extramural  funds will  be used for the  recall program,  fuels  Inspections and fuel
switching observations, data management, and assistance to States and localities
for unleaded gasoline Inspections,

     In 1983, the  recall  program will  continue to  assure  compliance  of  1n-use
vehicles with  emission  standards.   Greater  emphasis  will  be  placed  on  in-use
compliance In 1983,  with a consequent decrease 1n the  number  of SEA for assembly
line testing.  In  1983,  all EPA  enforcement testing  will  be  conducted In  Ann
Arbor,  Michigan.   The  tampering and fuel  switching  program, designed  to  reduce
1n-use  emissions,  will  be  continued at reduced  levels   with  efforts  to  assist
State and local  programs receiving Increased  emphasis.

     The activities of  the  fuels  program 1n  1983   Include  conducting  combined
unleaded gasoline and  vapor recovery Inspections at  service stations  and  fleet
dispensing facilities.  The program  will continue to monitor lead  usage reports
and the status of refiner efforts to achieve compliance with the  lead phase-down
program, and administer the  emission and fuel  waivers as required.

     During 1983,  the major activities  for the  mobile  source enforcement program
will  be  to  conduct  35  recall  Investigations,  490  surveillance/confirmatory
recall  tests, 509  fleet tampering/fuel  switching Inspections  (fleets, new  car
dealerships, and commercial  repair facilities), 25,000 combined fuels Inspections,
and 4,000 fuel  switching  observations.  In  addition,  the Agency will  Issue  17
vehicle SEA orders and provide  assistance  to 20 States and local  governments to
develop tampering programs.   The development  of these  State programs will  be
given Increased emphasis 1n  1983.
                                      A-117

-------
Water Quality
     SECTION TAB

-------
Page Intentionally Blank

-------
                                            WATER QUALITY
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1988       1982            1983 VS 1982
APPROPRIATION
 Salaries ft Expenses
 Abatement Control H
 Compliance
 Research ft Development

TOTAL, Hater Quality

PERMANENT FULL-TIME WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
                                             (DOLLARS IN THOUSANDS)
$110,647.2 $125,469.6 $107,603.1 $105,011.4  $92,084.7 -$12,926.7
$181,659.7 $141,787.4 $114,177.8 $110,530.5  $85,029.3 -$25,501.2

 $25,930.0  $30,277.0  $24,456.2  $21,254.8   $8,851.7 -$12,403.1

$318,236.9 $297,534.0 $246,237.1 $236,796.7 $185,965.7 -$50,831.0

   2,781.7    2,856,6    2,401.8    2,246.3    1.849.5     -396.8
   3,352.5    3,494.6    2,993.3    2,787.4    2,292.0     -495.4
$343,398.4 $409,337.0 $378,677.0 $273,429.6 $212,285.5 -$61,144.1
$444,719.0 $292,983.0 $292,983.0 $292,983.0           -$292,983.0
Water Quality Non-
Energy
 Salaries & Expenses
 Research ft Development

Municipal Uastewater
Non-Energy
 Salaries & Expenses
 Research ft Development
 $13,378.7  $14,592.0  $12,173.0  $12,713.0  $10,143.3  -$2,569.7
 $11,850.7   $8,622.4   $5,882.9   $6,429.7     $900.0  -$5,529.7
  $6,606.0   $7,644.2   $7,370,2   $7,169.8
  $8,132.0  $12,985.9  $12,014.7   $9,398.6
$5,514.8  -$1,655.0
$6,117.0  -$3,281.6

-------
                                                             WATER QUALITY
i
ro
ACTUAL
1981
Industrial Wastewater
Non-Energy
Salaries A Expenses
Research A Development
Salaries A Expenses
Research A Development
RESEARCH A DEVELOPMENT
Water Quality State
Program Management
Salaries A Expenses
Abatement Control A
Compliance
Effluent Standards A
Guidelines
Salaries A Expenses
Abatement Control A
JANUARY
ESTIMATE
1982
(DOLLARS

$3
$5
$23
$25
TOTAL $49


$11
$14



$5
$22

,993.5
,947.3
,978.2
,930.0
,908.2


,721.3
,322.7



,780.4
,392.7

$4,609
$8,668
$26,845
$30,277
$57,122


$10,069
$8,675



$6,333
$12,913
IN

.4
;7
.6
.0
.6


.0
.5



.9
.9
MARCH
ESTIMATE
1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE +
1903 DECREASE -
1983 VS 198;
THOUSANDS)

$4,039
$6,558
$23,582
$24,456
$48,038


$7,158
$3,801



$5,831
$10,237

.3
.6
,5
.2
,7


.9
,1



.9
.8

$3
$5
$23
$21
$45


$7
$8



$5
$6

,952.1
,426.5
,834.9
,254.8
,089.7


,959.8
,774.4



,165.6
,578.5

$3
$1
$18
$8
$27


$10
$2



$4
$7

,200.3
,834.7
,858.4
,851.7
,710.1


,974.9
,850.0



,785.5
,448.5

-$751.8
-$3,591.8
-$4,976.5
-$12,403.1
-$17,379.6


$3,015.1
-$5,924.4



-$380.1
$870.0
                  Compliance

                 Grants Assistance
                 Programs
                  Abatement Control A             $97,802.3  $64,800.0  $51,200.0  $60,700.0  $40,845.6 -$19,854.4
                  Compliance

-------
                                            MATER QUALITY
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
                                          (DOLLARS IN THOUSANDS)
Water Quality
Strategies Implementation
 Salaries 4 Expenses
 Abatement Control A
 Compliance

Mater Quality
Monitoring I Analysis
 Salaries'8 Expenses
 Abatement Control &
 Compliance

Municipal Source
Control
 Salaries & Expenses
 Abatement Control &
 Compl1ance

 Salaries 4 Expenses
 Abatement Control &
 Compl 1 ance
ABATEMENT A CONTROL

Water Quality
Enforcement
 Salaries 8 Expenses
 Abatement Control S
 Compliance
       $10,189.9  $12,165.9  $11,146.9  $10,240.1  $10,239.4       -$.7
        $7,092.4   $7,629.0   $6,083.2   $4,658.3   $4,620.3     -$38.0
        $7,981.3   $9,443.7   $8,479.2   $7,894.3   $8,791.7     $897.4
        $2,382.5   $1,922.9     $879.9     $573.7     $375.7    -$198.0
       $28,309.1  $32,102.5  $26,625.9  $26,661.3  $18,267.2  -$8,394.1
       $29,721.2  $36,002.3  $32,477.1  $23,777.8  $25,502.4   $1,724.6
       $63,982.0  $70,115.0  $59,242.8  $57,921.1  $53,058.7  -$4,862.4
      $173,713.8 $131,943.6 $104,679.1 $105,062.7  $81,642.5 -$23,420.2

TOTAL $237,695.8 $202,058.6 $163,921.9 $162,983.8 $134,701.2 -$28,282.6
       $15,577.1  $18,741.1  $16,956.9  $16,109.2  $13,181.0  -$2,928.2
        $3,577.9   $2,514.2   $2,514.2   $1,153.8     $176.9    -$976.9

-------
                                                              WATER QUALITY
                                                     ACTUAL    JANUARY      MARCH      CURRENT   ESTIMATE INCREASE +
                                                       1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                  1982        1982        1982            1983 VS 1982
                                                            (DOLLARS IN THOUSANDS)
                 Water Quality  Permits
                 Issuance
                  Salaries «  Expenses               $7,109.9    $9,767.9    $7,820.9   $7,145.2   $6,986.6    -$159.6
                  Abatement Control 8               $4,294.0    $7,329.6    $6,984.5   $4,314.0   $3,209.9  -$1,104.1
                  Compliance

                  Salaries &  Expenses              $22,687.0   $28,509.0   $24,777.8  $23,255.4  $20,167.6  -$3,087.8
                  Abatement Control I               $7,871.9    $9,843.8    $9,498.7   $5,467.8   $3,386.8  -$2,081.0
                  Compliance
E                ENFORCEMENT               TOTAL   $30,558.9   $38,352.8   $34,276.5  $28,723.2  $23,554.4  -$5,168.8
i
*"                TOTAL PERMANENT HORKYEARS
Water Quality Non-
Energy
Municipal Mastewater
Non-Energy
Industrial Wastewater
Non-Energy
RESEARCH & DEVELOPMENT TOTAL
Water Quality State
241.5
132.5
74.1
44E.1
280.9
233.6
145.5
67.1
446.2
191.8
214.2
138.5
49.2
401.9
103.8
201.2
117.9
46.0
365.1
98.0
166.3
84.4
35.1
285.8
210.8
-34.9
-33.5
-10.9
-79.3
112.8
                 Program Management

                 Effluent  Standards X                  113.4       100.0       85.0       78.7       68.4      -10.3
                 Guidelines

-------
                                                            MATER QUALITY
o
 t
                                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                     1981      ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                1982       1982       1982            1983 VS 1982
Mater Quality
Strategies Implementation
Mater Quality
Monitoring t, Analysis
Municipal Source
Control
ABATEMENT & CONTROL TOTAL
Mater Quality
Enforcement
Mater Quality Permits
Issuance
ENFORCEMENT TOTAL
TOTAL MORKYEARS
253.4
191.2
832.1
1.671.0
453.7
208.9
662,6

279.7
190.6
874.0
1,636.1
514.0
260.3
774.3

253.0
160.6
7?4.5
1.326.9
473.4
199.6
673.0

241.2
150.3
692.3
1,260.5
431.6
189.1
620.7

217.8
140.6
436.1
1,073.7
326.1
163.9
490.0

-23.4
-9.7
-256.2
-186.8
-105.5
-25.2
-130.7

               Mater  Quality Non-
               Energy

               Municipal  Wastewater
               Non-Energy

               Industrial  Hastewater
               Non-Energy
               RESEARCH * DEVELOPMENT
           347.5
           164.7
           367.7
           183.4
TOTAL
 97.0       92.4

609.2      643.5
338.1      319.1      263.2     -55.9


176.4      146.6      106.6     -40.0


 74.5       71.3       53.0     -18.3

589.0      537.0      422.8    -114.2

-------
                                                              HATER QUALITY
a
 i
01
                                                      ACTUAL     JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +

                                                       1981      ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -

                                                                  1982       1982       1982            1983 VS 1982
Water Quality State
Program Management
Effluent Standards 4
Guidelines
Grants Assistance
Programs
Mater Quality
Strategies Implementation
Hater Quality
Monitoring 4 Analysis
Municipal Source
Control
ABATEMENT 4 CONTROL TOTAL
Hater Quality
Enforcement
Hater Quality Permits
Issuance
ENFORCEMENT TOTAL
353.7
142.1
5.0
292.4
233.1
952.9
1,979.2
517.6
246.5
764.1
249.6
131.3
7.1
308.9
240.8
1,019.6
1,957.3
576.3
317.5
893.8
157.6
116.3

289.3
210.8
850.1
1,624.1
526.9
253.3
780.2
149,2
108.0

275.3
198.6
802.1
1,533,2
479.7
237.5
717.2
269.4
93.4

247.3
181.0
506.1
1,297,2
365.7
206.3
572.0
120,2
-14.6

-28.0
-17.6
-296.0
-236.0
-114.0
-31.2
-145.2

-------
                                 MATER QUALITY
OVERVIEW AND STRATEGY

     The Clean Water  Act, as  amended  in 1977  and  1981, provides the  framework
for protection of the Nation's waters.   The law recognizes that it is the primary
responsibility of the  States  to prevent, reduce, and eliminate  water pollution.
The States determine the  desired  uses  for their waters,  set  standards,  identify
current uses, and,  where  uses  are  being impaired  or  threatened, develop  plans
for the protection  or  restoration  of the  designated  use.   They implement  the
plans through control  programs such as  permitting  and enforcement,  construction
of municipal wastewater treatment  works, and nonpoint source  control  practices.
The Act also calls  for the  reliance on technology-based  effluent limitations  for
control of industrial  and municipal point sources of water pollution.  If desig-
nated uses will  not be attained  through the technology limits  established,  the
States must either  seek a greater level  of  control  .or reexamine the  viability of
designated uses.

     The Environmental  Protection  Agency has the role  of establishing  national
regulations and guidelines to  assure that the goals of the Act are met,  conduct-
ing research and development  to facilitate  the elimination of pollution,  making
grants to support  State and  local  activities,  and ensuring  that standards  and
regulations are enforced effectively.

     The Marine Protection,  Research and Sanctuaries Act also  forms a part  of
the framework to protect the Nation's waters.   It authorizes  the Agency  to  regu-
late ocean  dumping  through   the  development  of regulations  and  criteria  and
through an ocean dumping permit program.

     Efforts made in the last decade to  implement these laws and  improve surface
water quality are  showing results.  Existing  water quality is  being protected.
In many areas  significant  improvements  have  been  made,  resulting  in  reopened
public beaches and the return of valuable sport and  commercial  fisheries.  Public
support for these efforts  remains strong.

     EPA intends to improve upon this  record in  1983 and  future years by target-
ing pollution  abatement   efforts  toward  the  highest  priority  surface  waters.
This approach  will   maximize  the  benefits  achievable  with  available  Federal,
State, local, and industry  resources.  In implementing this  approach, the Agency
will ensure that its  regulations  are environmentally and economically  justified
and will revise  the regulations,  ff  necessary.  He  will be  seeking to  better
balance the economic and social costs of meeting regulatory abatement  requirements
with the environmental  benefits of such abatement efforts.

     The Agency has instituted a number  of  administrative and  regulatory reforms
to allow the States  and local  governments maximum flexibility to implement  their
water quality  programs to  fit their   needs.   These   reforms  will  allow  the
resources to be  directed at   the  priority   water bodies  where  uses are  being
threatened.  Each program area, highlighted  below,  has been reformed  to improve
implementation.   Reporting  has been  simplified through  streamlining or  elimi-
nation.  Better,  simpler  guidance  is  being, developed and  will  be  disseminated
after review for  scientific  validity.   He  will  increase and  emphasize Coordi-
nation and integration of water programs to ensure results.   An  example of this
is the better utilization of  water quality  monitoring information for management
decisions in areas such as enforcement.

State,Assistance

     The Agency has developed a funding  strategy  for grants  in the water program
which recognizes that  each  State  will  maintain  a  base  level   program, but  which
allows the balance of Federal  support to  be  dedicated to  meeting State-identified
                                      WQ-7

-------
needs in priority  stream  segments.  The 1983  funding guidance  emphasizes  using
Federal and State funds for programs which  will  achieve the  greatest  water qual-
ity benefits.  EPA will also  work with States to  ensure  integrated program man-
agement to meet  State  and National  water  quality needs; the most  effective use
of Sections 106,  205(g),  and  205(j)  grant  funds  will be  negotiated with each
State.

     In 1983, EPA will  also encourage better local  financial  planning and manage-
ment of Publicly  Owned Treatment Works (POTWs).   Major  emphasis will be placed
pn encouraging grantees  to demonstrate their financial,  legal, and  managerial
capability to  construct,  operate,  and maintain treatment  facilities with  EPA
funding assistance and guidance  materials.   States will  be encouraged to develop
user-oriented financial planning procedures that reflect  the unique institutional
structures and financial  powers of each State.

Criteria and Standards

     In another  important initiative,  the  Agency will   implement  two  policies
which will enhance State  flexibility in setting  water quality standards  and pro-
vide a  better basis  for  determining  pollution  controls  needed  to  meet  local
water quality objectives.

     First, the use attainability policy will focus State efforts on Devaluating
existing and designated uses to give greater consideration to the actual  economic
and environmental attainability  of existing  water  quality  standards.   Many water
quality standards were established without  sufficient analysis  of these  factors.
Second, site-specific  criteria  procedures  developed  by the  Agency will   be used
by the  States to  set  water  quality standards  based  upon  actual  water  quality
conditions and to  protect species actually  present,  rather than relying solely
upon laboratory-derived criteria which may not  reflect  real-world  conditions.
Together these policies  will   ensure that  unnecessarily  stringent controls  are
not imposed on dischargers to meet standards that  are not  realistically achiev-
able.

     Water quality research  efforts  in 1983 will  supp9rt the  implementation  of
those policies and will expand the Agency's understanding of toxic pollutants in
the Nation's waterways.

Effluent Guidelines

     A number of activities  support  the basic goal of restoring and  maintaining
the "chemical, physical,  and  biological  integrity  of the  Nation's   waters"  as
stated in the Clean Water Act.   One  of the  key  activities  in 1983  is completion
of effluent  guidelines for  industrial  dischargers.  The  development of scien-
tifically sound  and  economically  feasible  technology-based  effluent  standards
for industry  is a  vital element  in the  Nation's  water pollution control  program.
These effluent limitations, together  with water quality standards, serve as the
basis for many industrial  permits  under the National  Pollutant Discharge Elimi-
nation System  (NPDES)  and establish national  pretreatinent requirements  for the
most Important industries discharging  into publicly owned  treatment works; their
completion is important for State and  Regional  permit writers  to have the engi-
neering and  environmental data  to  issue  Best  Available  Technology  permits  to
control toxic discharges and to control pertain discharges to POTWs.

     For the majority  of  the industries cited  in  the Clean  Water  Act,  effluent
limitations will   have  been promulgated  by  the  close of  1982;  limitations  for
most of the retaining  major primary  industries will be promulgated in 1983.  The
program will  assure  that  regulations  will  be  environmentally  and economically
justifiable.  For major  regulations  we will conduct rigorous  regulatory impact
analyses which will  estimate  economic impact and social  costs as  compared  to
environmental benefits.
                                      WQ-8

-------
Water Quality Monitoring Strategy

     In 1983, EPA will  implement its water monitoring  strategy.   The strategy is
designed to  more  effectively use local,  State,  and Federal  resources  available
for collecting, analyzing,  and  interpreting physical,  chemical, and  biological
water quality data.  The  data  will  be used by the  States to make  site-specifiq
decisions in three areas:  (1)  adoption of site-specific water quality standards^
(2) analysis  of abatement  and  control  needs  (considering economic  as  well  as
environmental factors) for meeting water quality standards,  and  (3)  measurement
of water  quality  trends  at  the local,  State,   and  national  level,  as  well  as
assessment of program performance.

     The strategy  becomes  increasingly  important  as  technology-based  effluent
controls such as Best Available  Technology and  secondary treatment for industrial
and municipal dischargers,  respectively, are  implemented.   Site-specific  deci-
sions for additional controls to meet  local  water quality objectives  (as stated
in water quality standards)  must be  made using  adequate, appropriate,  and timely
data.  Implementation of the water monitoring  strategy is intended to  meet that
need.

     In support  of  the  Agency's  policy  to  upgrade  the  monitoring  program,
research efforts  will  continue  to   develop  and  refine standardized  laboratory
procedures for analyzing toxic  pollutants.

ConstructionGrantsManagement

     The recently enacted  1981  amendments  to  the Clean  Water Act provide  for a
more cost-effective and  water quality  based  construction  grants  program.  Long-
term Federal  financial  assistance  requirements  have  been reduced  significantly
from previous needs estimates as a result of these amendments.

     As in 1982, the Agency  in 1983  will continue a major effort  to  reorient the
management of the  program away  from Federal  project  decison-making and toward
oversight of  delegated  State program  activities.  The  States  are  being  given
maximum flexibility in  carrying  out  delegation  activities.  EPA  is  working with
the States to assure that results are achieved  in key  program  areas.

     In 1983,  Construction Grants program  efforts  will  continue to reform and
simplify requirements based  on Clean Mater Act provisions,  increasing the number
of States with full delegation of program management responsibility  and reducing
EPA's direct  project  management role  to a level permitted  by  legislation  and
sound financial management.   In  1983,  46  States  will  have  signed delegation
agreements; at least 25  of these States  will have assumed  full  delegation of the
program.  EPA will  continue to  be responsible  for  project management  responsi-
bilities in the 11  remaining nondelegated States  and Territories  and  for activi-
ties not yet delegated or nondelegable  in other  States.

     Working with the  States and the  Corps  of  Engineers,  EPA will  ensure that
limited construction grants funds go to projects  with the  greatest  water quality
and public  health  impact, that needed  facilities are  constructed  and  operated
cost-effectively,  and that completed  facilities continue to  meet  performance
requirements.  Efforts will  continue to complete projects expeditiously and to
eliminate audit resolution  and  project closeout  backlogs.  By the end  of 1983,
over 6,100 projects will  be completed and ,in  operation, 1,250 of them in 1983.

     Research and development efforts  in the  municipal wastewater program will
support the  construction grants program  in  several  ways in 1983.  The  Office of
Research and  Development  will   evaluate  innovative  technologies  currently  on-
stream; develop new  plant, equipment,  and  treatment  system  designs to  upgrade
the operation of existing  facilities;  refine monitoring procedures  to ensure the
accuracy and  reliability of  data on  plant influents and effluents;  and continue
research on cost-effective methods for  disposing  of  municipal  sludge.
                                     WQ-9

-------
Permit Issuance and Compliance

     The Agency  will   continue  to  issue  second-round  NPOES  permits  to  point
sources, primarily  industries  discharging priority pollutants.   Industrial  per-
mits will  be issued  for  industries where  guidelines  have  been promulgated  or
where no guidelines are scheduled and in areas with known or suspected impairment
of use  attributable to water pollution.  Additionally,  emphasis will  be placed
on issuance of resource-saving  general  permits  which  will be  used  to cover hun-
dreds of operations  with  similar discharges.   These   permits  will  be  issued  by
States having approved  NPOES programs  or by  EPA's Regional  offices  in  States
that have  not  received program approval.  An  objective will  be  to increase the
number of  States  requesting approval  for administration  of the NPDES program.
Additionally, the Agency will be  revising the  consolidated permit regulations to
streamline procedures,  reduce  unnecessary paperwork,  and eliminate  unnecessary
reporting requirements.  The national pretreatment program will  also  be modified
as appropriate in light of  a regulatory  impact analysis  evaluating the relative
costs and benefits of the program.

     In 1983, the Agency  will  continue to focus  on the  compliance of municipal
sources as well  as  major  industrial permittees.  Program policies  and  implemen-
tation efforts  affecting  municipal  compliance  will  be  carefully  coordinated
between the Grants,  Enforcement,  and Permits programs  to assure compliance im-
provement in Federally funded facilities.

     Where States have received NPDES program authority, the Agency will initiate
Federal enforcement actions  to  ensure  compliance  with the Clean  Water  Act,  when
States request assistance or fail to act.   The Agency will  continue to  monitor
compliance and initiate enforcement  actions  when  necessary when  States have not
accepted delegation of the NPDES program.  Administrative remedies will  be empha-
sized so that confrontational and resource- intensive  litigation can be used as a
last resort only if other attempts  at  resolving compliance problems have  failed.

      Response
     The Environmental Emergency Response program will  continue to maintain a .24
hour per day capability to receive and respond to accidential releases of oil and
other petroleum  products.   (Spills  of  hazardous  substances  are covered  under
Superfund.)  Removal   actions  will  be directed  by  Regional  field personnel  at
serious incidents for  which  the responsible party is  unidentifiable,  refuses to
clean up,  or  is  incapable of providing  adequate removal  and for  which  State or
local authorities lack appropriate  expertise  or  resources.   The cleanup monitor-
ing program will  continue to provide incentive  for  adequate removal  by  the re-
sponsible party,  as  well as  serve as  a mechanism for  drawing State  and  local
agencies into directing removal  themselves.

Ocean Disposal

     The Ocean Program will continue  implementation  of requirements to designate
dredged spoil  disposal  sites,  process applications and  issue permits  for  ocean
dumping, and  participate in  the  London Dumping  Convention,   In  addition,  the
Agency intends to  implement  a  revised  ocean disposal  program which  involves  a
program of  classifying  wastes,  developing  appropriate environmental  criteria,
designating safe  dumpsites,  and  establishing suitable  monitoring and  dumpsite
management requirements.   In support  of  the  Agency's  Ocean Dumping  program,
research will  focus  on developing  techniques  for predicting  ecological  impacts
of ocean dumping.
                                    WQ-10

-------
                                WATER QUALITY
SUMMARY OF INCREASES AND DECREASES
     1982 Water Quality Program

        Salaries and Expenses ..
        The net  decrease primarily  reflects   the  per-
        sonnel  reductions associated  with  progressive
        delegation of construction   grants  management
        to  the States, the  internal  transfer of legal
        resources  to the Office  of  Legal  and Enforce-
        ment Counsel, and the completion  of  Agency re-
        search in support of  EPA  litigation,   effluent
        guideline  development,  and   municipal   waste-
        water reuse.
        Research and Development
        The  net decrease reflects  the  progress  In  our
        research  work on   priority pollutant studies,
        urban  runoff  studies,   pretreatment studies,
        and  municipal  wastewater   reuse  projects,  as
        well  as the  completion  of  the  research  compo-
        nent of the Great Lakes research program.
        Abatement, Control  and Compliance.
        The  net  decrease reflects Agency  commitments
        to reorient the management  of  the Construction
        Grants  program  away   fron  Federal   decision
        making and toward oversight of delegated State
        programs and to avoid Issuance  of second round
        permits  to dischargers  for which a  BAT guide-
        line will later be issued.  The reduction also
        reflects the near completion of the   guideline
        development   effort,  a  decline  In  Section
        106  grants, the successful completion   of the
        Clean Lakes  and Chesapeake Bay  programs,  the
        implementation phase   of the Great   Lakes pro-
        gram, and the  internal  EPA  transfer of legal
        enforcement activities.
     1983 Water Quality Program.
(in thousandsof dollars)

       $236,796.7

        -12,926.7
        -12,403.1
        -25,501.2
       $185,965.7
SUMMARY OF CHANGES TO JANUARY 1982 BUDGET ESTIMATE
     January 1982 Estimate....

        January-March	

        Reorganization........

        Repr ogramnri ngs	

        Congressional Actions.
(in thousands of dollars)

       $297,534.0

        -50,201.1

         -1,095.8

           -671.1

         -8,622.0
                                       WQ-11

-------
                                                      (in thousands of dollars)
   A decrease of $14,296,100 to Abatement, Control
   and Compliance and a  decrease of $2,089,700 to
   Research and Development was  taken  against the
   March estimate  to  reflect  the  September  12%
   reduction.  Congressional  add-ons of $2,822,000
   for the Great Lakes Program ($994,000), manpower
   planning and training ($1,478,000),  and Advanced
   Wastewater Treatment  (AWT)   Review  ($350,000)
   were applied to the Salaries and Expenses appro-
   priation.  Congressional add-ons  of $1,500,000
   for the Great Lakes  Program  was  applied to the
   Research and Development appropriation.
   Congressional add-ons  of  $14,625,000  for  the
   Clean Lakes Program ($9,000,000), manpower plan-
   ning and training ($2,625,000), academic train-
   ing grants ($500,000) Chesapeake  Bay Water
   Quality Study ($1,000,000)  and Great Lakes
   Program ($1,500,000) were applied to the Abate-
   ment, Control and Compliance appropriation.
   Congress also restored $525,000 to the Abatement,
   Control  and  Compliance appropriation  for  the
   environmental emergency response and prevention
   program.  An additional reduction of $11,708,200
   was applied to the Salaries  and Expenses
   ($7,501,600), Research and Development ($280,200)
   and Abatement, Control and Compliance ($3,926,400)
   appropriations to meet Congressional ly mandated
   appropriation levels.

   Transfer Authority......	           -147.3

   A net decrease of $147,300 was transferred from
   thi? program as follows: $532,700 was transferred
   front Abatement, Control and  Compliance; $2,126,500
   from Research and Development; and $2,511,900 was
   transferred to Salaries and  Expenses.

Current 1982 Estimate..	       $236,796.7
                                 WQ-12

-------
                                     MATER QUALITY
Program Levels
          Budget
Actual   Estimate
 1981      1982
Clean Lakes Projects Awards	..   126       0
Clean Lakes Projects Completed	    20      20
Ocean Dumping Permits...............    50      40
Construction Grants Awards	 2,099     700

  Step I Awards	  (549)    (120)
  Step II Awards		...  (588)    (250)
  Step III & IV Awards..	  (962)    (330)

Active Construction Grants Projects.11,934   8,120
Step 3/2+3 Project Completion	   602
Signed 205(g) Agreements	    45      46
State Program Approvals
 (National Pollutants)
Discharge Elimination System).

Adjudicatory Hearings Settled
 (Major Sources)	
Permits Issued by EPA:

  Municipal--
    Major	
    Minor....	
    33
    48
   245
   115
  NonmunicipaT—
    Major	   229
    Minor	,	1,230
    General	     3

Enforcement Actions

  (Administrative Orders),
  Notices of Violation, &
  Referrals to U.S. Attorney	   808
33


38
           986
           940
                            Increase +
        Current             Decrease -
        Estimate  Estimate     1983
          1982     1983      vs. 1982
                       20
                       40
                       40
                      693

                      (18)
                      (33)
                     (642)
35
92
          350

          "20
                     0
                    40
                    40
                   661
                  (661)
                    8,078    5,715
                    1,186    1,250
                       46       46
 41



 73





 51
.• « *



280
• * *
 15
Compliance Inspections.,	 2,800   2,417
          720      760

        2,200    2,300
                   -20
                   -32

                  (-18)
                  (-33)
                  (+19)

                 2,363
                   +64
 +6



-19





+51
• * •



-70
* • *
 -5
                   +40

                   -58
                                       WQ-13

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                             WATER QUALITY

                                        Water Quality Non-Energy

                                     ACTUAL    JANUARY     MARCH
                                      1981     ESTIMATE   ESTIMATE
                                                1982       1982
                                   CURRENT   ESTIMATE INCREASE +
                                   ESTIMATE    1983   DECREASE -
                                    198Z            1983 VS 1982
PROGRAM
                                             (DOLLARS IH THOUSANDS)
Scientific Assessment
 Salaries X Expenses
 Research 8 Development

Technical Information
ft Liaison
 Salaries 4 Expenses
 Research & Development

Monitoring Systems 8
Quality Assurance
 Salaries 4 Expenses
 Research ft Development

Health Effects
 Salaries ft Expenses
 Research & Development

Environmental
Processes & Effects
 Salaries ft Expenses
 Research ft Development

Chesapeake Bay Study
 Salaries & Expenses
 Research ft Development
$1,092.5     $828.9     $814.6     $747,2
  $434.2     $689,2     $674.7     $562.9
  $214.0     $246.8     $214.8     $188.9
    $7.4      $14.4      $14.0      $14.0
$541.1   -$206.1
$100.0   -$462.9
$230.1     $41.2
$100.0     $86.0
$2,633.9   $2,817.5   $2,791,0   $2,676.4   $2,057.9   -$618.5
$1,089.6     $943.5     $924.8     $688.8              -$688.8
  $883.7   $1,084.5   $1,068.7     $948.6   $1,096.8    $148.2
$1,656.1   $2,155.9   $2,095.9   $1,671,5     $200.0 -$1,471.5
$7,395.9   $7,505.9   $7,283.9   $7,157.9   $6,217.4   -$940.5
$3,505.9   $3,339.1   $2,173.5   $1,992.5     $500.0 -$1,492.5
  $382.3   $1,114.7
$2,503.0     $868.4

-------
     HATER DUALITY
Mater Quality Non-Energy


Great Lakes Study
Salaries & Expenses
Research & Development
TOTAL:
Salaries S Expenses
Research ft Development
Water Quality Non- TOTAL
Energy
PERMANENT FULL-TIME HORKYEARS
Scientific Assessment
Technical Information
£ Liaison
Monitoring Systems 4
Quality Assurance
Health Effects
Environmental
Processes S Effects
Chesapeake Bay Study
Great Lakes Study
ACTUAL
1981

$776.4
$2,654.5
$13,378.7
$11,850.7
$25,229.4

15.2
3.0
51.8
12.6
146.2
5.8
€.9
JANUARY
ESTIMATE
1982
(DOLLARS IN
$993.7
$611.9
$14,592.0
$8,622.4
$23,214.4

12.0
3.7
48.8
13.5
142.2
6.4
7.0
MARCH
ESTIMATE
1982
THOUSANDS)

$12,173.0
$5,882.9
$18,055.9

12.0
2.7
48.8
13.5
137.2


CURRENT
ESTIMATE
1982

$994.0
$1,500.0
$12,713.0
$6,429.7
$19,142.7

10.0
2.7
44.8
13.0
130.7


ESTIMATE INCREASE •
1983 DECREASE •
1983 VS 198!

-$994.0
-$1,500.0
$10,143.3 -$2.569.7
$900.0 -$5,529.7
$11,043.3 -$8,099.4

5.5 -4.5
1.5 -1.2
33.7 -11.1
13.0
112.6 -18.1



-------
JO

«-i
Cft
                                                                 WATER QUALITY

                                                            Hater Quality Mon-Energy

                                                         ACTUAL     JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                          1981      ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                    1982       1982       1982            1983 VS 1982
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Scientific Assessment
Technical Information
4 Liaison
Monitoring Systems 4
Quality Assurance
Health Effects
Environmental
Processes 4 Effects
Chesapeake Day Study
Great Lakes Study
TOTAL WORKYEARS
241.5

26,8
4,0
66.2
21.7
210.5
7.6
10.7
347.S
233.fi 214.2

21.0 21.0
S.8 4.8
65,0 65.0
22.5 22.5
229.4 224.8
10.7
13.3
367.7 338.1
201.2 Ifi6.3 -34.9

18.5 13.0 -5.5
4.3 2.2 -2.1
62.0 44.9 -17.1
21.0 19.1 -1.9
213.3 184.0 -29.3


319.1 263.2 -55.9

-------
                                 REVISED
                                  WATER QUALITY

                             later Quality don-Energy

Budget Request

     The Agency  requests  a total  of $11,043,300 and  166.3 permanent  workyears
for 1983,  a  decrease  of  $8,099,400 and  34.9  permanent workyears  frm  1982.
Included In  this total Is $10,143,300  for  Salaries and Expenses and  $900,000
for Research  and  Development,  with  decreases   of  $2,569,700  and  $5,529,700,
respectively.  These decreases reflect  the  completion  of  major efforts In  de-
veloping criteria documents  for the  65  priority  pollutants and reduced  Invest-
ments 1n long-term  projects that  have   no  Immediate Impact  on current  program
priorities.

Program Description

     The Water  Quality  Research  Progra«  provides   the  scientific  Information,
techniques, and  support functions  needed by  EPA,  State,  and local  pollution con-
trol agencies to address  ambient water  quality problems  on a local or  regional
basis from  cost-effectiveness  and  risk-benefit  perspectives.   This   research
trill allow  the   development  of  more scientifically valid, site-specific  water
quality standards.  Research efforts In  this program are Intended to provide  the
scientific base  required   by  the  States  and EPA to provide  a balance  between
water quality goals  and the costs Involved 1n achieving them.  This  scientific
base consists primarily  of monitoring  and  measurement  methods; techniques  for
Identifying specific water quality  requirements  to  achieve desired water  uses;
techniques for translating water quality goals Into  permissible waste discharges;
and techniques for evaluating  the  cost,  benefits  and risks  of alternative pollu-
tion control  and ultimate disposal  schemes.  These  techniques are  essential  to
EPA, State, and  local  pollution control  agencies In determining realistic  water
quality objectives and in formulating environmentally  effective and economically
viable pollution abatement measures.

SC lENTIFIC ASSESSMENT

1981 Accomplishments

     In 1981,  the  Agency  used a   total  of  $1,526,700 for   this  program,   of
which $1,092,500  was  under the Salaries and  Expenses appropriation  and  $434,200
was for  extramural  purposes  under  the  Research  and Development  appropriation.

     Research efforts  1n  this  program provide a  range  of health  and  ecological
hazard assessment services that describe the  nature  of the  adverse effects  asso-
ciated with Ingestlon  of, or exposure to, mterborne pollutants.

     One of  the major accomplishments  during  the  year was  the completion  of
analysis of  14   chemicals  which will  lead to the  development of water  quality
criteria documents.  When  published, these documents will be used by  the Office
of Water Regulations  and  Standards  (OWRS) as a  scientific basis  for  proposing
water quality criteria under  Section 304 of  the  Clean Water Act.   Additionally,
research was  Initiated to  ascertain  the  toxic effects of  some  organic  compounds.
Waiver documents pertaining  to  Section  301(g) of  the Act  were also  completed
during 1981  for  the Enforcement office,  to provide a scientific basis  for evalu-
ating the merits of granting a  waiver for wastewater discharge permits.  Additional
scientific data  was gathered to revise criteria documents for the 65 water pollu-
tants, which  were essentially  completed In  1980  to  satisfy the mandates of  the
Consent Decree.  When  criteria for these pollutants  are  approved,  they will form
the basis for the development  of water quality standards.

-------
1982 Explanation of Changes from January Budget Estimate

                     January          March           Current
                    Estimate         Estimate        Estimate

                  $1,518,100       $1,489,300       $1,310,100

     The net  decrease  of  -$208,000 results  from  several  actions, as  follows:

     -  January - Harch.   (-$28,800)   This   change represented  a  decrease  of
     $28,800 fromthe  January  budget, of  which  514,300  was  for Salaries  and
     Expenses and $14,500 was for Research and Development.

     -  Reprogramming.    (-$67,400)   This  Agency-wide   reprograiwfng  of  -$3,300
     provided resources for transfer of the accountability function to the Office
     of Management Systems  and Evaluation and,  in  addition,  provided  additional
     resources for the Immediate Office of the  Assistant Administrator  for Solid
     Waste and Emergency  Response.   (This reprogramming  was included  in  a let-
     ter to Congress on December 16, 1982.)

        Additionally, during  the development  of  the  operating  plan,  several
     miscellaneous reprogramnrings,   which  are  not  reportable  to  Congress,  were
     made to this activity and resulted in a net decrease of -$64,100.

     -  Congressional Actions.  (-$111,800)   A  reduction  of -$111,800  was taken
     against the March  estimate reflecting  the  September  1.2% reduction  to  the
     Research and Development appropriation  and final Congressional  action on our
     1982 Appropriation Bill.

l_98_2_Prggrani

     In 1982, the Agency  is  allocating a  total  of  $1,310,100  and  10.0 permanent
work-years to this program, of which $747,200 is under  the Salaries and Expenses
appropriation and  5562,900  is  for  extramural  purposes under  the Research  and
Development appropriation.

     Research efforts in  1982  include:  developing  additional  scientific data to
assess cancer causing  properties  of some  of the  priority pollutants  listed  in
the Consent Decree; developing new procedures for ascertaining toxlcity of pollu-
tants under field conditions; and ascertaining additional  toxicity data for water
quality documents.

     Research efforts  also   include the  development  of  a  scientific  approach
to evaluate the efficacy  of  existing water  quality criteria In the presence  of
several chemicals.  EPA and  the  States will  use  the approach  to  issue discharge
permits when multiple chemicals are  present in the waterways.

1983 Program Request

     The Agency requests a total  of  $641,100  and 5.5 permanent workyears for this
program, of  which $541,100  is  under  the  Salaries and  Expenses  appropriation
and $100,000  is   for extramural  purposes  under  the   Research  and  Development
appropriation.  This  reflects  decreases of  $206,100 and $462,900,  respectively.
The reductions result  from  the expected  completion of all  major  work on  water
quality documents and  health risk  assessments  of  a selected  number of  organic
chemicals.

     The research program in 1983  will  concentrate on completing  a  number  of
health assessment and criteria  documents  which  the Office of Water will  use  to
develop site-specific water  quality criteria.  Research efforts will also focus
on the development of a lower cost,  short-term  test method  for waterborne pollu-
tants.  The Office of Water  will  use this method to derive human  health  effects
                                      WQ-18'

-------
data and  for  screening water  samples  for the presence of  pollutants  that cause
cancer in humans.  Additionally, health effects  data  will  be analyzed and incor-
porated in  risk  assessments.  These assessments  are  required to  support and to
revise existing  criteria.   Health hazard  assessments and  screening  evaluations
of water pollutants will also be undertaken.

     The Agency will  work with  the States in reviewing and updating existing water
quality standards.   A  methodology,  under development In  1982,  applying existing
criteria to complex  pollutant  mixture  conditions fs  scheduled  for completion in
1983.  This methodology will help EPA  and the States to  establish water quality
standards for non-conventional  pollutants.

TECHNICALINFORMATIOMAMDLIAISON                         '

     Refer to  the Oxidants  Non-Energy  narrative  for  a  description of  those
Technical Information  and  Liaison  activities that are  common  to all  research
and development  budget  sub-activities.   Activities  specific  to  this  budget sub-
activity are Indicated in the program element description below.

1981Accomplishments

     In 1981,  the  Agency used  a total  of  $221,400 for  this program, of  which
$214,000 was  under the Salaries and  Expenses appropriation  and $7,400  was  for
extramural purposes under the Research  and Development appropriation.

     Specific accomplishments included: coordinating  presentation  of  nine  work-
shops on  environmental  assessment which  used water quality models for watershed
and stream management,  assisting the Clean  Lakes Program in  preparing a  program
guidance manual, and preparing  several  lake restoration  technology publications.

1982 Explanation of Changes from January Budget Estimate

                     January          March           Current
                    Estimate         Estimate        Estimate

                    $261,200         $228,800        $202,900

     The net  decrease   of  -558,300  results  from  several  actions  as  follows:

     "  January - March.   (-$32,400)   This   change  represented  a  decrease  of
     $32,400 from the January budget,  all  of which was for Salaries and Expenses.
     This decrease had no significant effect on this program.

     -  Congressional Actions.   (-$25,900)  An  additional  reduction  of -$25,900
     was applied io theSalaries and Expenses appropriation to meet Congressional-
     ly mandated appropriation  levels.

1982 Program

     In 1982,   the  Agency 1s allocating  a  total  of  $202,900 and  2.7 permanent
workyears to this program, of  which  $188,900 Is under the Salaries and Expenses
appropriation and $14,000  is  for  extramural  purposes  under  the Research  and
Development appropriation.

     Specific activities underway in Hater Quality Include:  coordinating  three
workshops on  environmental   assessment  using  water  quality models   to  develop
water quality  management plans, preparing a handbook  on  conducting water quality
surveys, and developing wasteload allocation models.   This program also  manages
Information systems that track the Office of  Research and Development's projects
and resources.
                                       WQ-19

-------
1983 Program Request

     The Agency  requests a  total  of  $330,100 and 1.5  permanent workyears  for
this program,  of  which  $230,100  is  under the  Salaries  and  Expenses  appropria-
tion and $100,000  is  for extramural  purposes under the Research  and Development
appropriation.  This  reflects increases  of  $41,200  and $86,000,  respectively.
The increases  will  enable the program to  increase the production of  scientific
and technical information to fulfill  a growing  demand by State and local officials
and the  general  public  for literature  concerning the quality  of  the  Nation's
water resources.

     In 1983, the Technical  Information and Liaison program will  stress providing
the necessary technical  information  to State and  local  officials in  support  of
their increased role in administering environmental programs.  Specific projected
outputs include:   water  quality  analyses,  guidelines to establish  site-specific
criteria, watershed modelling techniques,  and wasteload allocation procedures.

MONITORIMG SYSTEMS AKD QUALITY ASSURANCE

1981Accompl1shments

     In 1981, the  Agency used a  total of  $3,723,500  for this program, of  which
$2,633,900 was under the Salaries and Expenses appropriation  and $1,089,600  was
for extramural purposes under the Research  and Development appropriation.

     The program  provides  water quality  monitoring  procedures  and  advice  to
Federal, State, and local officials.   The program also provides quality assurance
methods to ensure the accuracy and reliability of the data.

     Major accomplishments Included the following:

     - Standards  for  water  quality  analysis  were distributed to  laboratories.

     - Water quality networks  to monitor priority toxic pollutants were published.

     - In-stream investigations of twelve sites with high concentrations of  toxic
       substances was completed.

1982 Exj^lanatlon^^p                       Budget Estimate

                     January          March           Current
                    Estimate         Estimate        Estimate

                  $3,761,000       $3,715,800      $3,365,200

     The net decrease  of -$395,800  results  from several  actions,  as  follows:

     -  January - March.    (-$45,200)  This   change  represented  a  decrease  of
     of $45,2tJo from the  January budget,  of which $26,500  was for  Salaries  and
     Expenses and  $18,700 was for Research  and Development.  This  decrease  had
     no significant effect on this program.

     ~  Deprogramming.   (+$68,500)   A transfer  of +$360,200  into  this  program
     wili provide for the Environmental Impact Statement (EIS) effort.

        A second reprogramnrlng (-5422,500) transferred funds  out  of this  program
     to perform  chemical  analysis  of samples  collected during  the conduct  of
     transport and fate  research.  These analyses  were  formerly performed within
     the monitoring systems  and  quality assurance activity.  However, with  the
     Issuance of  a Memorandum of Understanding  by the Assistant  Administrator
     for Research  and  Development,  it  was agreed that  the monitoring research
                                      WQ-20

-------
     function will  concentrate  on  the  development of  new sampling methods  and
     techniques.  Once  completed,  the  methods will  be  passed  on  to the  user
     population.  Since this particular requirement utilizes existing techniques,
     the work is  more  appropriately performed  by  the  environmental processes and
     effects program.

        An Agency-wide  reprograinmimj  (-$14,200)  orovided  resources  for transfer
     of the  accountability  function  to the  Office  of  Management  Systems  and
     Evaluation and, in addition, provided additional  resources for the Immediate
     Office of  the  Assistant  Administrator   for   Solid  Waste   and   Emergency
     Response.

        These three  reprogrammings  above,  totalling  -$76,500,  were included  1n
     a letter to Congress on December 16, 1982.

        Additionally, during the development of the operating plan,  several  mis-
     cellaneous reprogrammings, which are  not  reportable to Congress,  were  made
     to this activity and resulted in a net increase of +5145,000.

     -  CongressionalActions.  (-$419,100)  A  reduction of -$276,400  was taken
     against the  March  estimate reflecting  the  September  12%  reduction  to  the
     Research and Development  appropriation resulting  in the decision  to delay
     inorganic methods  research  1n  ambient water  quality waters  and to  delay
     evaluation of methods  suitable for monitoring  brackish and marine  waters.

        An additional reduction of  -5142,700 was  applied to the  Salaries and Ex-
     penses appropriation to meet Congressionally  mandated appropriation levels.

     -  Transfer Authority.   (Mo change)  The net change applied  to this activity
     1s made up of  a decrease  of -$139,000 from Research  and Development and  an
     Increase of +$139,000 to Salaries and Expense for  printing of methods manuals,
     laboratory supplies, and equipment, and other critical expenses.

1982 Program

     In 1982, the Agency  is allocating  a total of $3,365,200  and  44.8 permanent
workyears to this program, of which 52,676,400  1s under the Salaries and Expenses
anproprlation and $688,800  is  for extramural   purposes  under the  Research  and
Development appropriation.

Research activities Include:

     - Reference  methods for  priority  toxic  pollutants,  hazardous  substances
       and chlorinated organics are being completed.

     - A bioassay protocol, applicable to monitoring  industrial effluent plumes
       and ambient  water quality,  is being  developed.   The  protocol has  been
       tested in two streams and will be standardized  in 1982.

     - Distribution  of  quality  control  samples to  ensure the accuracy of water
       quality measurements  is continuing.

     - Existing water quality monitoring networks  are being statistically evalu-
       ated to  ascertain their  adequacy  in trend  monitoring as  well as  their
       ability to detect episodic events.

     - Specialized  support  is  being provided  to  enforcement,  Regional  and  pro-
       gran offices.
                                     WQ-21

-------
1983 Program Request

     The Agency requests  a  total  of $2,057,900 and 33.7 permanent  workyears  for
this program,  all  of  which  Is  under the  Salaries  and Expenses  appropriation.
This reflects decreases of  5618,500 and  $688,800,  respectively.  These decreases
reflect the Agency's cooperative  agreements  with  States in which they  will  per-
form those functions where  they  have more knowledge and greater  expertise.   EPA
will perform  research  in  those  areas   where  there  is  national   application.

     In 1983, special attention will  be  given  to  the  development  of accurate and
reliable monitoring methods to improve the scientific  quality of data.   This  data
is vital  in  supporting the  Agency's monitoring strategy,  which  Is designed  to
assess the Nation's water quality, to enable State and Agency program managers to
better understand the  cause and  effect relationships of environmental  problems.
and to evaluate the effectiveness of control  measures.

     the 1983 program proposes the following:

     - Standardization  of  rapid  and inexpensive  biological  screening  tests.

     - Development  of chemical  monitoring  methods  for newly identified  toxic
       pollutants.

     - Improvement  of  techniques  for  extraction,   concentration,  separation,
       identification, and measurement of organic and inorganic materials  bound
       to sediment or participates.

     - Provision of 1n vitro biological calibration materials.

     - Support of  auality assurance to ensure development  of a sound  data  base
       through Interlaboratory  validation  testing  of  analytical   methods   for
       priority pollutants.

     - Analysis  of  present  national  and  selected   State  monitoring  network
       designs.

     - Evaluation  of analytical   techniaues  which  detect  reduced  concentrations
       of toxic substances.

HEALTH EFFECTS

1981 Accomplishments

     In 1981, the Agency  allocated a  total  of $2,539,800  for this  program,  of
which $883,700 was  under  the Salaries and Expenses appropriation and  $1,656,100
was for extramural  purposes under the Research  and  Development   appropriation.

     In 1981, the  Health Effects  program collected the following  data  to  sup-
port the  develooment  of  Criteria  documents  for the 65  priority pollutants:
naphthalene's behavioral,   reproductive,  and Imnunologic effects;  toxicologies!,
reproductive, and  behavioral  effects  of two  pollutants;  toxlcological data  on
six chemical compounds; and  carcinogenclty  data  on  polychlorinated biphenyls
(PCBs).

1982 Explanation of Changes from January Budget Estimate

                     January          March           Current
                    Estimate         Estimate        Estimate
                  $3,240,400       $37IS4TBOT      $2»6ZO,TO

     The net decrease  of  -5620,300  results from  several   actions, as  follows:
                                      WQ-22

-------
                - March.  (-575,800)  This change represented a decrease of
     575,800 from  !ihT~ January  budget,  of  which  $15,800  was   for  Salaries  and
     Expenses and  560,000 was  for  Research  and  Development.   This  decrease  had
     no significant effect on this program.

     -  Congressional Actions.   (-$544,500)  A  reduction  of  -$424,400 was  taken
     against "the  Ma'rclj  estimate  reflecting the   September  12%  reduction to  the
     Research and  Development  appropriation  and  final  Congressional  action  on
     our 1982  Appropriation  Bill.   An  additional   reduction  of  -$120,100  was
     applied to  the  Salaries  and Expenses appropriation  to meet  Congressional!./
     mandated appropriation levels.

1982'Program

     In 1982, the Aqency is  allocating a total  of 52,620,100 and  13.0 permanent
workyears to this program,  of  which $948,600  is  under the  Salaries  and  Expenses

appropriation  and $1,671,500 is  for  extramural  purposes under  the  Research  and
Development aopropriation.

     The overal1  goal  of the  water qua!1ty health  research program   is   to pro-
vide the health  science  information,  techniques,   and   support  functions  needed
by the  EPA  Office of Water Regulations  and Standards (OWRS),   and by  State  and
local pollution  control  agencies   to  achieve  the  Agency   goal   of   addressing
ambient water quality problems on a local  or regional  basis  from  a  cost-effec-
tiveness  and   risk-benefit  perspective.  This   approach  will  permit  departure
from the  use  of uniform national   water quality  standards as  a basis  for esta-
blishing pollution control requirements.

     In 1982,  the  water quality health  research  efforts   will  concentrate  on
human health effects  of  several  priority water  quality pollutants.   The initial
research employs  studies  such  as  whole animal and  animal  cell,  bacterial  or animal
tissue test-tube (i_n_ vitro)  tests for genetic  changes or presumptive cancer-causing
effects.  Positive results  1n  these  critical  health factors will result  in lowest
possible control  levels  and further testing  becomes considerably less important.
If the  first  studies are negative,  then acute and chronic   target-organ  toxicity
evaluations, reproductive  and  birth  defect   assestnents.   and  determinations   of
effects on  the   immune   (and   other  host  defenses)  systems  will   be  performed»

     In addition, final  evaluation  of recreational  waters  is being  completed  in
1982 and reported in terms of  degree  of hazard to  human  health  from  swimming  OF
other forms of  body-contact recreation  at  various levels of water  pollution.   A
freshwater recreational   criteria  document is  being   prepared.   It   should  help
establish the level  of safety and the relative importance of  each  type of pathogen.

     The program will also provide health expertise  to  OWRS  to  assist in assessing
waters with high  concentrations of potentially  toxic chemicals (toxic  hot spots).
Short tern tests for a variety of health endpoints such as genetic effects, cancer,
birth defects and reproductive  and target-organ  toxicities  are being  developed
and validated for field applications  to be used  in evaluation  of  water quality
problem areas.    A manual  of health effects  tests  for toxic hot  spots  Is  being
preoa red.

1983 Progratn Request

     The Agency  requests  a  total  of SI,296,800 and  13.0  permanent  workyears  for
this program, of which  51,096,800  is  under the  Salaries  and Expenses appropria-
tion and 5200,000 is for extramural  purposes  under  the Research and  Development
appropriation.   This reflects an Increase of 5148,200 and a decrease  of $1,471,500,
respectively.  The increase reflects greater employment of the Agency's scientific
expertise in this program.  With the anticipated completion  of the  major effort in
developing water  quality  criteria documents pertaining to the 65 priority pollu*
tants, a relatively small extramural  amount is  needed  for this program in 1983 to
complete some health studies.
                                      WQ-23

-------
     A few of the water quality documents pertaining to the 65 priority pollutants
have received  some criticism  for  insufficient  health data  to support  setting
health-based standards.  Research efforts  in  1983  are  designed  to  fill  data gaps
Identified for some of the priority pollutants.

     The 1983 program will  also focus on conducting toxicologlcal tests to address
questions the  Office  of Water Regulations  and Standards has on  individual com-
pounds.  Among  the 65  water  quality  criteria  documents,  there  were  certain
pollutants for which data needs validation.  For another dozen pollutants {mostly
chlorinated phenols),  there  was  only  sufficient  data to  set criteria  based  on
taste and odor.

     These activities are  designed  to  support the  water planning and  enforce-
ment functions.  Additionally,  research efforts  will  be devoted  to developing
short-term tests for  acute toxic effects.   Investigations of  waters with high
concentrations of  toxic  chemicals  will  continue.   Research  will  also  continue
in the development of more lower cost methods for  screening water  samples  for
the presence of toxic chemicals.

ENVIRONMENTAL PROCESSES AND EFFECTS

1981 Accomplishments

     In 1981, the  Agency used  a  total  of $10,901,800  for this  program,  of which
$7,395,900 was  under  the  Salaries  and Expenses appropriation  and $3,505,900
was for  extramural purposes under  the  Research  and  Development  appropriation.

     The major activities of this program element are development of the scienti-
fic base needed by EPA and the States In selecting reasonable ecological  goals in
fresh and marine waters and translating those goals into equitable source control
requirements.  This scientific base consists  primarily  of protocols and  guides
for: (1) identifying  highest water  uses potentially  attainable at  a  given site;
(2) deriving realistic site-specific ecological quality criteria;  (3)  translating
ambient water quality  goals  Into equitable source control requirements;  and  (4)
evaluating the costs  and benefits of alternative  freshwater and marine pollution
control strategies.

     Major accomplishments in 1981 were the following:

     - Completion  of  data analysis  on  ecological effects of  selected  priority
       toxic pollutants.  This completion  allowed the preparation  of water qua-
       lity criteria documents.

     - Completion  of   a  draft  protocol for  deriving  site-soecific  ecological
       fresh water quality criteria.   The  purpose of this protocol  Is to provide
       for modification  1n the  national criteria  in order  to make them more
       applicable to site-specific conditions.

     - Completion  of  an assessment on  the  ecological  effects of urban  runoffs.
       The Water Planning  Division  uses the  information to  assess the  efficacy
       of existing urban nonpolnt source control techniques.

     •* Completion  of  a report on "Effects  of  Contaminated Sediments on Represen-
       tative Estuarfne Species and  Developing Benthic Communities.11   The Dredge
       and Fill  Program  uses this  information to formulate  policies pertaining
       to wetlands.

»     - Completed a report on "Predicting  and Avoiding Degradation of Natural Water
       Bodies by the  Toxicologlcal  Effects  of Relocating  Sediments." The Dredge
       and Fill  Program  also  uses  this   information  to  formulate  policies.
                                      VJQ-24

-------
1982 Explanationof Changesfrom January BudgetEstimate

                     January          March           Current
                    Estimate         Estimate        Effimate.

                  $10,845,000       $9,457,400      $9,150,400

     The net decrease  of  -$1,694,600  results  from several  actions, as  follows:

     ~  *jfinu-ry " Harcn'   (-$11-387,600)   This  change  represented  a  decrease  of
     of SI ,387,600  from the January budget,  of  which $222,000  was  for  Salaries
     and Expenses and  $1,165,600  was for Research  and  Development.   This  decrease
     resulted in  the  termination  of the  Clean  Lakes  research  efforts  and  the
     renewable resources program.

     ~  ^Programming.   (+$379,500)   One  Agency-wide  reprogramrfng  provided  re-
     sources forthe  transfer  of the  accountability  function  to the  Office  of
     Management Systems  and  Evaluation  and,  in  addition,  provided  additional
     resources for the  Immediate  Office of the Assistant Administrator for  Solid
     Waste and Empergency  Response.  (-$43,000)  A second transfer into this pro-
     gram is to perform chemical  analysis  of samples collected during the conduct
     of transport and fate  research.  These analyses were formerly  performed  with-
     in the monitoring  systems and  quality  assurance activity.   (+$422,500) (The
     two reprogrammings  above,  totalling  +$379,500, were  included  in a letter to
     Congress on December 16, 1981.)

                       Sltg'l?'  (-5625,500)   An additional   reduction  of -$625,500
                 '"to  Hie  Salaries  and  Expenses  appropriation  to  meet  Congres-
     sional ly mandated appropriation  levels.

     -  Transfer Authority.   (-$61,000)  The  net  change  applied  to  this  activity
     is made up  of a decrease  of -$181,000  from  Research  and Development and an
     increase of +$120,000 to Salaries and  Expenses to  support  travel  for  coop-
     erative efforts  with  other  labs;  to  move equipment;  for printing   of  users
     manuals; for  repair  services;  for lab  supplies;  for  equipment  replacement;
     and for ADP  mathematical  modeling  activities; and  other critical expenses.

1982Program

     In 1982, the  Agency is allocating a  total  of $9,150,400 and  130.7 oernanent
workyears to this program,  of  which  $7,157,900 is  under the  Salaries  and  Expenses
appropriation and  $1,922,500 is  for extramural  purposes under  the  Research  and
Development appropriation.

     The Environmental  Processes   and   Effects   program  in  1982   focuses   on  the
following research efforts to support  the Office  of  Water  Programs' activities;

     - Work   is  continuing  on the  development   of  guides  for  translating  the
       laboratory-derived water quality  (ecological)  criteria to the real world,
       site-specific conditions.   These are   needed  to  ensure  the  promulgation
       of reasonable and valid State  and Federal water quality standards.

     - Research is  continuing  on improvement  of  watershed  analysis models.   EPA
       and the States  need these models 1n  calculating wasteload allocations  for
       toxic pollutants and in assessing exposure levels.

     - Investigation continues on  the transport and fate of  pollutants from  ocean
       outfalls.  The Office of Water Program will use the information to  Identify
       problem areas.

     - Staff is  reviewing  requests  for modifications  in  waste treatment  require-
       ments under  Section 301(h) of  the Clean  Water Act.   The  Office  of  Water
       Program Operations will  use reviews  to  make adjustments.
                                      WQ-25

-------
1933 Prograpijtequest

     The Agency requests a total  of  $6,717,400 and 112.6 permanent  workyears  for
this program, of which  $6,217,400 is under the Salaries and  Expenses appropria-
tion and $500,000 is  for extramural  purposes under the Research  and Development
appropriation.  This reflects decreases of $940,500 and $1,492,500,  respectively.
The decreases result  from  reductions in  long-term  research efforts, that have no
immediate impact on current planning and regulatory needs.

     In 1983, the program will  emphasize  the  development and refinement of techni-
ques to support the Agency's policies in water quality management;  namely,  water
quality use  attainability  and  development  of  site-specific  criteria.   These
policies will  give the  States  greater  flexibility   in  establishing  realistic
water quality standards  and will  have  the potential   of  reducing  costs  to  meet
discharge limitations.

     The Environmental Processes  and Effects  research  program will  provide data,
guidelines, and procedures  to implement the Office of Water Programs' regulatory
policies.  Specific activities are as follows:

     - Provide guidelines for deriving  site-specific  water quality criteria  for
       toxic pollutants.

     - Provide  procedures for determining highest  water uses attainable through
       water  quality  improvements  (and  especially  to   identify where nonwater
       quality  factors  prevent   attainment  of   "fishable/swimmable"  waters).

     - Develop water quality predictive  techniques  for  use  by  State and local
       agencies.

     - Apply water quality predictive models to  develop  cost-effective pollution
       control measures.

     - Provide procedures for predicting  and  detecting   ecological impacts from
       ocean discharges.

     - Assist the Office of Water Programs in the review  of  requests from  muni-
       cipalities for reductions in waste treatment  requirements  under  Section
       301(h) of the Clean Water Act.

CHESAPEAKE BAY STUDY

1981 Accoiiipl 1 shments

     In  1981,  the Agency used a total  of $2,885,300  for this program, of  which
$382,300 was under the  Salaries and  Expenses  appropriation and $2,503,000  was
for extramural purooses under the Research and Development appropriation.

     This  program  provided  the  scientific base needed to resolve four problem
areas associated with Chesapeake Bay: (1) toxic  substances, (2) submerged aquatic
vegetation, (3)  eutrophication, and  (4)  the Bay  environmental  management process.

     Major accomplishments in 1981 were:

     - Baseline concentrations of significant toxic pollutants in  Bay  sediments
       were characterized.  This information was useful in assessing the signifi-
       cance of sediment deposits as a secondary  source  of toxicants, the extent
       to which toxic pollutants may enter the  food  chain  via  bottom  feeding
       oraanisms, and the potential impact of contaminated sediments on submerged
       aquatic vegetation.

     - A report was completed giving  a methodology for selecting predictive models
       for analyzing eutrophication 1n Bay watersheds.
                                      WQ-26

-------
     - A report was  completed  that  reviews  historical  water quality and   climatic
       data  from  the Bay.  This Information  is  useful  in determining   the  rela-
       tionship between nutrient levels  and  Bay eutrophlcation.

1982 Explanation of Changes froiti January Budget Estimate

                     January          March           Current
                    Estimate     .    Estimate        Estimate

                   51.983,100          	             ,...

     The net decrease of -51,983,100 results from  the following  action:

     ~  January-March.   (-$1,983,100)   This   change  represented  a  decrease  of
     of 5i,^SI,Mu-from  the January budget, of which  $1,114,700 was for  Salaries
     and Expenses and  5868,400 was  for Research and  Development.   This  decrease
     resulted in the termination of  the  Chesapeake Bay  research  program.

19B2 Program

     Since all fundamental research  work was completed for  the  Chesapeake Bay, the
Agency did not request any  research  resources  for this program  in  1982.   Howev,er,
$1,973,900 and 4.8 permanent woricyears were provided under  the  Abatement,  Control,
end Compliance appropriation to  compile and disslminate the  research results   of
this program.

1983 Program Request

     Since all fundamental research  work and the dissemination of  research results
have been completed,  the Agency requests no resources for this program  In  1983.

GREAT LAKES STUDY

1981 Accomplishments

     In 1981,  the  Aqency  used  a  total  of J3,430,900 for  this program,  of  which
5776,400 was under the Salaries and  Expenses appropriation  and $2,654,500   was  for
extramural  purposes under the Research and Development  appropriation.

     This program provides the scientific base  needed  In resolving  water  quality
problem in the Great Lakes  as required to  meet  United  States commitments in the
United States-Canada Water  Quality  Agreement.   Major concerns are:  (l)the presence
of persistent toxic pollutants  in  the  water,  bottom sediments, fish   and possibly
humans who are consuming  contaminated   fish;  (2) the  verification  of   nutrient/
phytoolankton models used  to  develop  phosphorus  loading  targets  that are incor-
porated  into  the revised Agreeenent; and (3)  impacts  of   open  lake  disposal   of
dredged material.

     Major accomplishments in 1981 were:

     - An assessment was completed of the atmospheric contributions  of   phosphorus,
       PCBs, and heavy metals to the upper Great Lakes.  This information  is needed
       in determining the relative significance of the  various   pollution  sources
       and the most cost-effective   strategy for reducing   overall   loadings to the
       Lakes to  a  level  that  will  allow  attainment  of  water  quality  goals.

     - Assessments of alternative nutrient  management  strategies  were   completed
       for Lakes Ontario, Erie,  Huron,   using   previously  developed eutrophication
       models.  This effort  supports work  underway to  identify  the most cost-
       effective way of achieving nutrient loading targets.
                                      WQ-27

-------
     - A study of Saginaw Bay was completed to assess the accuracy  of  eutrophica-
       tion models used In the development of nutrient management  strategies  that
       have since been implemented.  This type of information is  needed  in  order
       to verify the accuracy and precision of these models, used  in making multi-
       million dollar decisions on pollution control  requirements.

     - A predictive assessment was completed of expected water quality impacts from
       several  alternative approaches to the disposal  of polluted dredge  materials
       in the Great Lakes.  A disposal scheme expected to minimize the impacts  was
       recommended and is now being implemented.

1982 Explanation ofChangesfrom JanuaryBudget Estimate

                     January          March           Current
                    Estimate         Estimate        Estimate

                   SI,605,600          ....        .SZ,494,000

     The net  increase  of +$888,400  results  from  several   actions,  as  follows:

     -  January - March.   (-$1,605,600)   This  change  represented  a  decrease  of
     of si ,605,600  from the January  budget,  of  which 5993,700  was for  Salaries
     and Expenses and  $611,900 was  for Research  and Development.  This  decrease
     resulted in the termination of the Great Lakes research program.

     -  Congressional Actions.   (+$2,494,000)   The  Congressional  add-on to  this
     activity wascomprised  of  an  increase  of  +$994,000  to   the  Salaries  and
     Expenses appropriation and +$1,500,000 to the Research and Development
     appropriation for the Great Lakes research program.

1982 Program

     In 1982, the Agency  is  allocating a total  of $2,494,000  to  this  program,
Of which $994,000 is under the Salaries and Expenses  appropriation  and  11,500,000
is for  extramural  purposes   under  the  Research  and  Development  appropriation.

     The Great  Lakes  research program  In  1982 is concentrating on the following
activities:

     - Characterizing  and modeling  the sources;   fate,   pathways,  and  effects
       of persistent toxic  substances.   This data is  needed  to  identify necessary
       pollutant reductions to  adequately  protect  human health,  fishery resources,
       and wildlife in the Great Lakes Basin.

     - Verifying  the accuracy  and precision of predictive models  used  in develop-
       ing phosphorus loading  targets  that  are  incorporated  into  the   revised
       United States-Canada Water Quality Agreement.

     - Validating techniques under  natural  conditions.  These techniques are deve-
       loped for use in the rapid assessment of Impacts  from  dredging  bottom sedi-
       ments and the disposal of polluted dredged material.

1983 Progran Request

     Since all  eutrophication  research  work,  the primary  mission  of this program,
has been completed,  the Agency requests no research   resources   for this  program
in 1983.  Since  the  program  is a joint effort with   the   Canadian government,"the
Agency requests  S3,813,500 and 10.8 permanent workyears under  the Abatement, Con-
trol and  Compliance  appropriation to implement the research  findings   in  abating
pollution in the Great Lakes.
                                      WQ-28

-------
                                                               WATER QUALITY

                                                      Municipal Hastewater-Hon-Energy
                                                        ACTUAL
                                                         1981
                                               JANUARY
                                               ESTIMATE
                                                1982
                       MARCH
                      ESTIMATE
                       1982
                      CURRENT   ESTIMATE INCREASE +
                      ESTIMATE    1983   DECREASE -
                       1982            1983 VS 1982
                   PROGRAM
                                                                (DOLLARS  IN THOUSANDSJ
I
Technical Information
t Liaison
 Salaries 4 Expenses
 Research 8 Development

Monitoring Systems $
Quality Assurance
 Salaries * Expenses
 Research * Development

Health Effects
 Salaries 8 Expenses
 Research 8 Development

Environmental
Engineering fi
Technology
 Salaries 4 Expenses
 Research 8 Development

TOTAL:
 Salaries & Expenses
 Research 8 Development

Municipal Wastewater   TOTAL
Non-Energy
$304,0
  $5.1
                                                       $524.0
                                                       $261.1
$377,1
$248.0
           $525.4
           $392.1
$377.1
$248.0
           $517.8
           $384.4
$302.4
  $1.6
$239.1
$280.0
                                                       $808.3     $871.4     $859.6      $967.0   $1,018.8
                                                     $1,689.5   $2,241.2   $2,178.2   $2,031.2   $1,232.9
-$63.3
$278.4
                                                       $51.8
                                                     -$798.3
                                                      $4,969.7   $5,870.3   $5,615.7    $5,900.4   $4,256.9 -$1,643.5
                                                      $6,176.3  $10,104.6   $9,204.1    $7,365.8   $4,604.1 -$2,761.7
                                                      $6,605.0   $7,644.2   $7,370.2    $7,169.8   $5,514.8 -$1,655.0
                                                      $8,132.0  $12,985.9   $12,014.7    $9,398.6   $6,117.0 -$3,281.6

                                                     $14,738.0  $20,630.1   $19,384.9  $16,568.4  $11,631.8 -$4,936.6

-------
I
                                                               MATER QUALITY

                                                      Municipal Hastewater-Non-Ehergy

                                                        ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                                   1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME KORKYEARS
Technical Information
S Liaison
Monitoring Systems 4
Quality Assurance
Health Effects
Environmental Engineering

4.8 5.3 5.3 5.3 3.2 -2.1
6.7 6.6 6.6
15.4 17.3 17.3 15.3 15.3
105.6 116.3 109.3 97.3 65.9 -31.4
                   & Technology
                   TOTAL PERMANENT HORKYEARS
132.5
145.5
138.5
117.9
84.4
-33.5

-------
                                            WATER QUALITY
                                   Municipal Haste*ater-Non-Energy

TOTAL WGRKYEARS
Technical Information
& Liaison
Monitoring Systems S
Quality Assurance
Health Effects
Environmental Engineering
ACTUAL
1981

8.6
12.0
17.7
126.4
JANUARY
ESTIMATE
1982

8.6
11.8
26.6
136.4
MARCH
ESTIMATE
1982

8.6
11.8
26.6
129.4
CURRENT
ESTIMATE
1982

8.6

23.1
114.9
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982

4.8 -3.8

23.7 .6
78.1 -36.8
a Technology
TOTAL WQRKYEARS                       164.7      183.4      176.4      146.6      106.6     -40.0

-------
                                  WATER QUALITY

                         Municipal  Wastewater Non-Energy
Budget Request
     The Agency requests a total of $11,631,800 and 84.4 permanent workyears  for
1983, a decrease of $4,936,600 and 33.5 permanent workyears  from 1982.   Included
1n this total  is $5,514,800 for Salaries and Expenses  and  $6,117,000  for Research
and Development, with  decreases of $1,655,000 and $3,281,600,  respectively.  These
decreases result mainly  from expected  completions  of major projects In  health
effects research and  from  reduced Investments  In  low priority  sewage  treatment
projects.

Program Description

     The broad  goal of the Municipal  Wastewater  research  program is to  furnish
environmental  engineering support to  the  States and municipalities to carry  out
their wastewater  control  programs  effectively  and  economically.   The  program
objectives are  to:  (1)  provide scientific  and  technical  expertise  to  states
and municipalities in  solving local problems with state-of-the-art control tech-
nologies; (2)  accelerate and encourage the  use  of Innovative and Alternate (I/A)
technologies by  providing  technical  support,   technology  transfer  and  assess-
ments of emerging  technologies  to states,  municipalities  and design engineers;
(3) develop improved  process design  data and provide  information  that  reduces
construction and  operating  costs as  well as  Improves  performance,   reliability
and efficiency of publicly owned treatment works; and (4) provide health  effects
data and assessments associated with various treatment technologies.

TECHNICAL INFORMATION  AND LIAISON

     Refer to  the Oxidants Non-Energy narrative  for a description of  those Tech-
nical Information and Liaison activities  that are  common  to all  research  and
development budget  sub-activities.    Activities  specific  to  this  budget  sub-
activity are indicated 1n the program  element description below.

1981 Accomplishments

     In 1981,  the  Agency used  a  total  of  $309,100  for this program,  of which
$304,000 was under  the Salaries and  Expenses  appropriation  and $5,100 was  for
extramural  purposes under the Research and Development appropriation.

     Specific  products  in   1981   for  the  Municipal  Wastewater  area  included:

     -  The preparation, publication, and  dissemination  of  a  revised technology
        transfer design manual  on land treatment of  municipal  wastewater.

     -  Conduct  of seminars  and  conferences  to  exchange   information  on   the
        following subjects:   conservation of  publicly-supplied  potable  water;
        small  alternative wastewater  systems;  innovation in the environmental
        technology Industry;  sludge  treatment and disposal.

1982 Explanation of Changes  from January Budget Estimate

                         January      March       Current
                        Estimate     Estimate     Estimate

                        $625,100     $625,100     $304,000

     The net decrease  of -$321,100  results from  several  actions,  as  follows:
                                       WQ-32

-------
                        (-$225,000)  During the development of the operating plan*
     several mTscenneous reprogrammings, which are  not  reportable to  Congress,
     were made  to  this activity  and resulted In  a  net  decrease  of  -$225,000.

     -  Congressional Actions.  (-$75,900)   An  additional reduction  of -$75,900
     was applied  to the  Salaries and  Expenses  appropriation  to meet Congres-
     sional ly mandated appropiation levels.

     -  Transfer Authority,   (-$20,200)  The net change  applied to this activity
     1s made up  of  a decrease of -$21,400 from Research  and Development   and an
     Increase of +$1,200 to Salaries and Expenses for funding of essential  opera-
     ting costs.

1982 Program

    In 1982, the Agency  is   allocating  a total  of  $304,000  and  5.3  permanent
workyears to this   program,  of  which $302,400  is under the  Salaries and  Ex-
penses appropriation  and  $1,600 is  for extramural purposes  under the  Research
and Development appropriation.

     Specific products planned in 1982 for the Municipal  Wastewater area
include:

     -  The preparation, publication, and dissemination of technology
        transfer design manuals on land application of sludge and
        municipal sludge dewatering.

     -  Conduct  of  seminars   and  conferences  to   exchange  information  on  the
        following subjects:   municipal   wastewater disinfection;  operation  and
        maintenance of  Publicly-Owned Treatment Works;   and  the  assessment  and
        evaluation of emerging Innovative and Alternative Technologies.

1983 ProgramRequest

     The Agency requests a total of $519,100 and  3.2 permanent workyears for this
program, of which $239,100 is under the Salaries and Expenses  appropriation  and
$280,000 is for extramural purposes under the Research and Development appropria-
tion.  This reflects a  decrease of $63,300 and an  increase  of $278,400,  respec-
tively.  The decrease  results  from  organizational  changes  to rake the  program
more cost-efficient.  The  increase  will  be used  to purchase outside  support  and
automated systems to fulfill  the Information  needs of State and local authorities.

     In 1983, the Technical Information and Liaison program will focus  on  provid-
ing Information and  guidance  to State and local  officials for  more  reliable  and
efficient operation and maintenance of sewage treatment works.   Additionally,  the
program will stress providing the necessary technical  information to  State  and
local officials In support of their increased role  1n  administering environmental
programs.

MONITORING SYSTEMS AND QUALITY ASSURANCE

1981 Accomplishments

     In 1981, the  Agency  used  a  total   of $785,100 for  this  program, of  which
5524,000 was  under  the  Salaries  and Expenses  appropriation  and $261,100  was
for extramural  purposes under the Research and Development appropriation.

     This program  furnishes   the  engineering  and  technology  support  for  the
Agency's Oil and Special   Materials  Control Division within  the newly  created
office of  Environmental  Emergency  Response and  Prevention.   The program  pro-
vides engineering  designs,  equipment  development,  field  control  techniques,
and on-scene technical  assistance for the control and mitigation of  spills  of
hazardous materials.
                                      HQ-33

-------
     The Monitoring Systems and Quality Assurance program in 1981  had the.follow-
ing major outputs:

     -  Prepared ten Spill Prevention Control and Countermeasure studies
        and five oil spill contingency studies.

     -  Provided acquisition and analysis of aerial  photography to the
        oil and hazardous spills program and to the Environmental  Impact
        Statement Program.

     -  Analyzed aerial  photography of industrial sites for the Regions
        and program offices.

1982Explanationof Changes from January Budget Estimate

                         January      March       Current
                        Estimate     Estimate     Estimate

                        $917,500     $902,200       	

     The net decrease  of  -5917,500  results  from several  actions, as  follows:

     -  January -March.  (-$15,300)   The change  represented a decrease of $15,300
     from the January budget,  of  which $7,600 was for Salaries and Expenses  and
     $7,700 was for Research and  Development.  This decrease had no  significant
     effect on this program.

     "  Reprogramniing.   (-5902,200)    A  reprogrammi ng  out  of this  element  of
     5360,ZW wt11 provide  support for the Environmental Impact  Statement (EIS)
     effort in the  monitoring  systems and  quality  assurance program.   A  second
     reprogramming out  of this element  of  $542,000  will  support  the  hazardous
     waste program.   A  major  portion of  the  old municipal  program  concerned
     aerial surveillance  research to  support  spills.  These  efforts  are  now
     closely related to the objectives of  that program.   (The two reprogrammings
     above, totalling -$902,200, were  included in a letter to Congress on December
     16, 1981).

1982 Program

     In 1982,  resources  for this  program are  budgeted as part of  the Hazardous
Waste research program.

1983 ProgramRequest

     In 1983, resources for this  program are requested as  part of  the Hazardous
Waste research program.

HEALTH EFFECTS

1981 Accompl i shments

     In 1981, the Agency  used  a total of $2,497,800  for this program,  of which
$808,300 was  under  the  Salaries  and  Expenses appropriation  and  $1,689,500  was
for extramural purposes under the Research  and Development appropriation.

    In 1981,   the Health  Effects   research  program had  significant  accomplish-
ments in the areas of land application of sludge  atid land treatment of wastewater.
Sludge application to land  is  a  major concern  because  it  is believed  that  the
cadmium content  of  sewage  sludge used  on  agricultural  lands  may  have adverse
human health  effects.   Pollution   control  programs  must  know the  potential  for
increasing the  human  body  burden of  cadmium caused  by eating  foods  grown  on
sludge treated  soils.   With this  objective  in  mind,  the  absorption  of cadmium
by vegetables was studied in 1981.
                                      WQ-34

-------
     In the area of  land  treatment  of  wastewater,  a study was  completed  1n 1981
which examined the levels  of exposure  to microorganisms in  wastewater  aerosols.
A method for predicting the transport of these microorganisms  from spray  irriga-
tion sites was also  developed.  The dispersion model developed  in  this  study  was
shown to produce satisfactory results when used to  predict  aerosol  concentrations
of microorganisms.  Use of  this model with minimal  monitoring is a viable alterna-
tive to  extensive   aerosol  monitoring,  and  1s  significantly  less  expensive.

     Also in this same  area  a study to examine the uptake of human  viruses from
plants grown at wastewater treatment sites was completed.   Results indicate that
unless the plant roots  are damaged  and  a very large dose of viruses  applied,  no
significant uptake   of  viruses  occur.   These data  show  that  health  hazards
associated with root uptake  from  agriculture  grown at wastewater  land  treatment
sites are very unlikely.

1982 Explanation of Changes from January Budget Estimate

                       January       March         Current
                      Estimate       Estimate        Estimate

                     $3,112,600     $3,037,800     $2,998,200

     The net decrease  of  -$114,400  results  from  several   actions, as follows:

     ~  January - March.   (-$74,800)   This   change  represented  a  decrease  of
     $74,BOd from the  January  budget,  of  which  $11,800  was  for Salaries  and
     Expenses and $63,000  was for Research and  Development.   This  decrease  had
     no significant effect on this program.

     -  Con gressional Acti ons.  (-$39,600)  An  additional  reduction  of -$39,600
     was applied to ttie Salaries  and Expenses appropriation  to meet Congression-
     ally mandated  appropriation levels.

     *>  Transfer Authority  (Mo Change)  The  net change  applied to this activity
     is made up  of a decrease of  $147,000  to  Research  and  Development and an in-
     crease of $147,000 to Salaries and Expenses for critical  expenses.

1982 Program

     In 1982, the Agency  is  allocating  a total of $2.998.200  and  15.3 permanent
workyears to this program, of which  $967,000  is under the Salaries  and Expenses
appropriation and $2,031,200  is  for extramural purposes under the Research  and
Development appropriation.

     The Municipal  Wastewater health program in  1982  focuses  on  four  primary
areas: (1)  Land treatment of wastewater,  (2)  Wastewater  aquaculture, (3) Land
application of sludge,  and (4) Uastewater reuse.

     First, in the land treatment area,  epidemiological  studies of  human infec-
tious disease are being carried  out at land treatment  sites in Texas and  Israel.
Research 1s progressing  on the  fate  of  intestinal  pathogens  during  wastewater
pretreatment, particularly  in  wastewater  stabilization  ponds  (holding  ponds,
lagoons).  This research 1s  to  be expanded to include  study of the  soil  matrix
under various environmental conditions.   Studies  are also determining the
consequent entry of  bacterial  and viral  pathogens  into groundwater and the food
chain.

     Second, products  from aquaculture treatment systems  will  be  evaluated  for
the presence of  harmful  toxic organics  (e.g., polychlorinated  biphenyls)  trace
elements (e.g.,  cadmium), and  human  pathogens  (e.g.,  viruses  and  bacteria).
This research  is Important  in determining the  potential  health problems  from
human consumption  of  food  products   (fish   and  shrimp)  grown  in  aquaculture
wastewater treatment systems.
                                      WQ-35

-------
     Third, land application of  sludge  to food chain crops has the potential  of
causing disease in humans  from either microbial pathogens or toxic pollutants  by
exposure through direct contact,  bioaccuwilation In  food products, or  groundwater
contamination.  Current  research  Is  determining  the  public  health  hazard  of
exposure to microbial pathogens  as a  result of land application of sludge.  The
bioaccumulation of toxic  organics  and heavy metals  In  plants  and animals grown
on sludge amended  soil  Is being  further  clarified.  Animal feed  crops grown  on
sludge amended  soil  have shown  Increased metal concentrations In certain  organs
as well as  evidence  of  reproductive  effects.   This  data is being evaluated and
confirmed.  The data will be used by the program office  in developing  safe  guide-
lines for sludge disposal.

     Fourth, In  wastewater reuse,  methodology is  being developed  to isolate,
concentrate and identify  both  toxic  organics  and viruses  fron  wastewater  pro-
cesses for  reuse.   These  methods  are an  important  step needed  to  measure and
identify possible agents of concern in wastewater processes  for reuse.

     Pro jiram Request
     The Agency requests a  total  of $2,251,700 and 15.3 permanent workyears  for
this program, of which  $1,018,800 is under the Salaries and Expenses  appropria-
tion and $1,232,900  is  for extramural purposes  under the Research and  Develop-
ment appropriation.   This  reflects  an increase  of $51,800  and a  decrease  of
$798,300, respectively.   The  increase reflects  greater utilization  of  inhouse
capabilities.  The  decrease results  from this  shift  to inhouse  research  and
elimination of some low priority projects.

     In 1983, the  Health Research  program  will   concentrate  on the  development
of health  effects  Information  needed  for the effective  treatment,   conversion,
utilization and disposal  of  municipal  sludge.   This  Information is needed  to
support the  Resource  Conservation and Recovery  Act  (RCRA)  regulatory effort  of
the Office  of Solid  Waste and provides  health  information  for assessments  of
of technology needed  to implement the Construction  Grants  Program  in  a  cost-
effective and environmentally safe manner.

     Research wfll   also concentrate  on  producing data  for use In  preparing  a
health assessment  of  municipal  sludge use  on  land.  Additionally, a  determina-
tion of the fate and Health effects of organic compounds occurring in  food  crops
grown on  sludge  amended soils  will be  made  so that the effects  of  Increased
human dietary Intake  of these  compounds can  be more  accurately evaluated.   A
document summarizing our past research on the health effects of  cadmium in humans
will be  prepared.   This document will  include  data  on  cadmium  levels in  the
diet, indicators of cadmium bloaccumulation  in  humans,  and the effects of cadmium
on the health of  individuals  exposed to high levels  of cadmium in their diets.
This effort  will   support  the  development   of  regulations  for  sludge  disposal
under RCRA and the Clean Mater Act.

     Health Effects  research  on  the  public  health  problems   associated   with
Innovative and Alternative (I/A)  technologies,  such  as  high  rate  sludge  land
application and  aquaculture treatment,  will  be intensified.   When  sludge  is
applied to  land at an  Increased  rate, there is  more  potential  for  groundwater
or surface  water contamination  due  to  increased runoff and  overloading of  the
natural (soil column)  treatment   system.   For  this  reason,  a  report  on  the
survival  of  enteric  pathogens  in the soil  matrix   under  various environmental
conditions will  be prepared-  Efforts  to  produce an assessment  of the uptake  of
various contaminants  (organics,  metals, and  pathogens)  in products produced  from
the use  of  aquaculture  treatment  systems   for  sludge and  wastewater  will  be
increased.
                                     MQ-36

-------
     Finally, although  the  health  assessments  for  the  land  application  of
municipal wastewater will  be  completed in early 1982, we have  been  asked by the
Office of  Water  Program  Operations   to  initiate  an update  of  this  document
periodically.  Therefore,  a  small  level  of  effort  will   be  made  to  collect
additional, new data which would improve the health assessment document
currently being written.

ENVIRONMENTAL ENGINEERING & TECHNOLOGY

1981 Aecompl1shments

     In 1981, the Agency used a total  of $11,146,000 for this program,
of which  $4,969,700  was  under  the   Salaries   and Expenses  appropriation  and
$6,176,300 was  for  extramural  purposes  under  the  Research  and  Development
appropriation.

     The Environmental  Engineering  and Technology program had  major accomplish-
ments in  the  following four  areas  in  1981:   (1)  innovative  and  alternative
technology, (2) land  treatment of  municipal  wastewater, (3) sludge  management,
and (4) plant operation and design.

     For the Innovative  and alternative  (I/A) technology  research  program,  fifty
detailed technical  reviews  of innovative technology  projects were  completed  in
1981 for the Regions and States.  These  projects were  recommended  for funding by
the Construction  Grants Program.    In  order  to  Increase the  use  of  innovative
technology by the  States,  municipalities and consulting firms,  assessments were
completed and  reports  produced  for the following  emerging technologies:  Deep
Shaft Biological Process, Vertical  Tube  Reactor, Anaerobic  Wastewater Treatment,
Solar Thermal Energy Applications  in Wastewater  Treatment and Fine  Bubble Diffus-
ers.  These detailed  engineering  evaluations address process theory  and design,
energy consumption, capital,  operation and  maintenance  costs and the  potential
market of the new technology.

     In 1981, the  land  treatment  research program completed a  second  edition  of
a process design manual  on land treatment of municipal  wastewater.   The U.S. Army
Corps of Engineers, Department  of Agriculture and  the Office of  Water  Research
and Technology, Department of  the  Interior, were also involved in this cooperative
effort.  This manual provides the consulting  engineer, State and Federal  regula-
tory personnel   and others  with  the   latest  design information  on  slow  rate,
rapid infiltration  and  overland  flow  systems and  will be helpful  in evaluating
the cost-effectiveness  of  these technologies for treating wastewater on  a  site-
specific basis.

     The sludge management research program  completed a study  that  investigated
the application  of  a  new mesophlllc-thermophilic  anaerobic  sludge  digestion
process that can  reduce the volume of sludge by  30 percent in existing plants
having major sludge treatment and  disposal problems.

     Based on the  results  of  the comprehensive surveys conducted over  a  three
and a  half  year  period,  the  plant  operation   and design  program  developed  a
Composite Correction Program  (CCP)  to improve  existing  plant  performance  with-
out incurring major capital  construction costs.   The purpose  of  the CCP  is  to
eliminate all  the  performance limiting  factors at a plant through the  Imple-
mentation of the   correction  recommendations that  are  made as a part  of  the
comprehensive evaluation.  The CCP was successfully  demonstrated  at  several
facilities.   USEPA's Office of Enforcement  adopted  the CCP  approach in  1981  for
widespread use as a part of Its national  enforcement strategy  for  publicly  owned
treatment works.
                                      WQ-37

-------
1982 Explanation of Changes from January Budget Estimate

                       January        March         Current
                      Estimate       Estimate       Estimate

                    $15,974,900    $14,819,800    $13,266,200

     The net decrease  of  -$2,708,700 results  from  several actions, as  follows:

     -  January «- March.   (-$1,155,100)   This change  represented  a decrease  of
     $1,155,100 from the January budget,  of  which $254,600 was for  Salaries  and
     Expenses and  $900,500 was  for  Research  and   Development.   This  decrease
     resulted in a reduced  level of  effort in  process development for water reuse,
     urban runoff, and land treatment systems.

     -  Reprogramming.   (+$225,000)  During  the development  of  the  operating
     plan, several  miscellaneous  reprogranmiings,  which  are  not  reportable  to
     Congress, were made  to  this  activity and  resulted  in  a  net Increase  of
     •(-$225,000.

     -  Congressional  Actions.  (-$1,766,800)   A reduction of  -SI,DOS,800  was
     taken against the March  estimate  reflecting the September 12%  reduction  to
     the Research and  Development  appropriation.  This  decrease  will  result  in
     the reduction of efforts  as follows:   (1) to develop and assess best manage-
     ment practices for stormwater  runoff control;  (2) to  develop  control  tech-
     nologies for toxic substances;  (3)  to develop disposal systems  for municipal
     sludge.

     An additional reduction of -$761,000 was applied to the Salaries
     and Expenses ($583,300)  and  Research and Development ($177,700)  appropria-
     tions to meet Congressionally  mandated appropriation levels.

     -  Transfer Authority.   (-$11,800)  The net  change  applied to  this  activity
     is made up of  a  decrease of -$879,800 from  Research  and Development  and  an
     increase of +$868,000  to  Salaries and Expenses.   The Increase to Salaries  and
     Expenses will provide  for lab  supplies and for  service contracts on existing
     analytical instrumentation use in methods research and other  critical  expen-
     ses.

1982 Program

     In 1982, the Agency is allocating  a  total  of $13,266,200  and 97.3 permanent
work years to this program,  of  which $5,900,400 is under the Salaries and Expenses
appropriation and $7,365,800  is  for extramural  purposes  under the  Research  and
Development appropriation.

     The Municipal Wastewater  research program being implemented  in  1982 focuses
in the  following  areas: (1)   innovative  and alternative  technology,  (2)  plant
operation and design,  (3)  sludge management,  (4) new treatment process  develop-
ment (5) land application  of  wastewater,  (6)  small  wastewater flows,  (7)  toxics
pollutants control, and (9) urban  runoff.

     The innovative and alternative (I/A)  program Increases ORD technical support
to encourage the use of I/A technologies by municipalities.  ORD's I/A  technology
program 1s actively evaluating new technologies that  enhance the ability of munici-
palities to meet discharge  limitations In a cost-effective manner.   Program empha-
sis is  on  assessing emerging  technologies having potential to  reduce  capital,
operational/maintenance, and  energy  costs.    Several   assessments   of  emerging
technologies are being developed and will  be  published  in  order  to  promote their
use by  the States, municipalities  and  private   sector.   This  information will
them be disseminated to these  user  groups  through a clearinghouse which  operates
in direct support to the Construction Grants  Program.
                                      WQ-38

-------
     Because many treatment  plants  funded by the Construction  Grants  Program do
not perform adequately or reliably, there is a continuing need to develop methods
to upgrade plant  design  and  improve plant operation.  In  providing  solutions to
these problems the  research  effort  will  focus on:  Identification of  any opera-
tional, maintenance, and  design problems  that affect POTW  compliance problems,
such as  sludge treatment  and rotating biological contactors; preparation of de-
sign Information documents for  use  by  treatment  plant designers on the following
topics: effects of  peak  flows,  aeration devices, energy conservation,  and side-
streams; investigation of  unit process  reliability  for future design  considera
tions; and improvement control reliability through development of better applica-
tion information  and  the  establishment  of  a self supporting Instrument Testing
and Certification Laboratory,

     The sludge management program  continues to  hold a high  priority  because it
represents a major operating cost and environmental  problem for the municipality.
Research focuses  on providing  more efficient  and low  cost  processes  for  the
treatment, conversion, use and  disposal  of sludge from publicly owned treatment
works (POWTs).  Emphasis is placed on energy recovery  and optimization of stabili-
zation processes  including:   acceleration  of the development  of the  two-phase
anaerobic sludge digestion process;  evaluation of wet air oxidation in a vertical
tube reactor for total destruction  of  organic evaluation  of in-vessel  composting
sludge to fuels;  and the application of cellulose enzymes.

     Since conventional  biological   treatment  plants  have  traditionally  been
expensive to operate due  to high capital, space, manpower and energy requirements,
the program in new process development alms to enhance the ability of municipali-
ties to meet discharge limitation with the least cost combination  of  processes.

Current research emphasis  is  on  evaluating novel biological  concepts and processes
which have the  potential  to  reduce cost and energy, increase  reliability,  and
reduce solids production.

     In many areas  of  the  nation, land treatment can  be a particularly effective
procedure for treating wastewater while utilizing the wastes as nutrients, and the
water to Irrigate cover crops.   With this 1n mind, research  is being devoted to
developing design and  operating information for rapid infiltration  and  overland
flow systems.  These systems show particular promise  and are receiving Increasing
attention by the engineering community.  Research is  also working in  the aquacul-
ture area where  emphasis  is  on developing  design  and operating  information  for
utilizing water hyacinths  and other plants for wastewater treatment.

     The Clean Water Act  (CWA) requires that 4$ of the Construction Grants Program
funding be set aside for rural communities.  The shortfall of technology applicable
to small communities and on-site use must  be filled  if system failures are to be
avoided and cost-effectiveness maintained.  The current research program is being
directed toward development  and dissemination of a range  of  technologies in the
form of  handbooks  for  design,   operation  and management.   Specific  activities
include:  the Small Wastewater  Flows  Clearinghouse that provides ready access to
technical Information by the user community; the Cincinnati  Center for the control-
led study of  viable alternative technologies; and development of a handbook  on
alternative wastewater collection systems for use by  design engineers.

     The primary objectives of the toxic  pollutants control program are to produce
information on the  sources and  treatability of toxic pollutants as well  as  to
develop strategies for toxics control.   The major focus of this program in 1982 is
on: completion of a  report with  characterizes  the sources, occurrence, and concen-
tration of the influents  and effluents in POTW  systems  for Information gathered
from a 25 city survey; assessment reports on the treatability and removability of
priority pollutants and  other  toxic  organics by a  variety of  conventional  and
advanced processes;  and development of toxic control  options and strategies using
various modeling and  systems analysis approaches.   The results of  this research
will aid in determining the levels of toxic industrial waste discharge a POTW can
handle without adverse effect on Its treatment processes.
                                      WQ-39

-------
                                          JQ-40

1983 Program Request

     The Agency requests  a  total  of $8,861,000 and 65.9 permanent workyears  for
this program, of which  $4,256,900  Is for the  Salaries and  Expenses appropriation
and 54,604,100  1s  for  extramural   purposes  under the  Research  and  Development
appropriation, with decreases  of $1,643,500 and $2,761,700,  respectively.  This
decrease results from major reductions In the level of effort  for new biological
processes development,  land treatment  of  wastewater,  snail  wastewater  flows,
toxics pollutants control,  and urban runoff.   These  are mature programs,  which
are no longer considered priority research activities.  Additionally,  an  adequate
technological base has  been developed.   The  gathered  technical  Information  1s
sufficient to Implement creditable programs 1n each of the  above  areas.

     The Municipal  Wastewater  research program 1n  1983 will  concentrate  the bulk
of Its  efforts on  Innovative  and alternative technology,  plant  operation  and
design, and  sludge management.  There will also  be  some  resources provided  For
new process  development,  land treatnent of wastewater,  small wastewater  flows,
toxic pollutant control  and urban runoff.  Because these areas are lower priority,
and have no  immediate  impact on current programs, they will be  funded at levels
lower than in years past.

     The major activities for  the innovative/alternative (I/A)  technology program
proposed in  1983 Include:  expanding the current I/A program to  actively promote
the Increased use  of new treatment  processes through technology transfer;  main-
taining an I/A  clearinghouse and publishing assessments of  promising  new treat-
ment methods.   The  I/A program will provide  consulting engineers with  detailed
planning, engineering,  and  analysis assistance  for innovative technologies on  a
project-by-project basis.   Post-construction evaluation will  be Initiated for  the
most innovative projects  in full  operation during 1983.   These  evaluations will
fully document the ability  of  I/A classified projects  to meet design  standards In
a cost-effective manner.  The  current I/A Clearinghouse function  will  be  expanded
to collect,  and analyze  the information derived  from post-construction evalua-
tions.  Information will be made available to the Regions, States, municipalities,
consultants and equipment manufacturers.

     Major activities in plant operation and design will  focus on: development of
improved design Information  and recowendations for low-cost correction of design
deficiencies In existing plants; identification of operational problems and design
deficiencies with recommendations for solutions of problems and process modifica-
tions; publication of  design Information that will include  reliability  factors,
aeration systems, and slow  rate land treatment.

     In the  sludge management  program, research will'be  conducted in  three major
areas: processing and  treatment,  conversion processes, and  sludge  use  on  land.
In the  processing  and  treatment area,  the  research  activities will  focus  on:
defining the parameters which  can be used to predict the state of sludge  stabili-
zation in order to  Improve the  operation of sludge treatment processes in publicly-
owned treatment work (PQTU).   Evaluation of new digestion processes  that  have  the
potential of reducing the amount of  sludge produced while Increasing  the  quantity
of gas produced.   Research on  sludge conversion  will focus on  new  gasification
processes.  Land application of sludge research will  focus on:  demonstration of
wider acceptance for use  of municipal sludge  as fertilizer on agricultural  land;
characterization of the mechanisms  controlling cadmium and  heavy metals uptake by
plants; and  performance evaluations  of landfill sites containing sludge and toxic
organics 1n  order to determine the  effectiveness of landfill  designs-

-------
     The 1983 program  1n new  process  development will  focus on development  of
advanced biological processes  and maintaining  an  In-house capability  for proof
of concept  studies utilizing  the Test  and  Evaluation  Facility to the  private
and municipal sectors.

     The land treatment of  sewage program in 1983  will  concentrate  on:  extending
the use of  overland flow technology  to colder  climates so  that the  geographic
range can be  greatly  increased  without environmental   damage; developing  better
managerial information on the  behavior and control  of nitrogen and organics  in
rapid Infiltration  treatment  systems;  and promoting the Increased  use  of lower
cost land application  treatment systems by municipalities.
                                       WQ-41

-------
                                             MATER QUALITY

                                        Industrial Hastewater Non-Energy
                                     ACTUAL
                                     1981
             JANUARY
            ESTIMATE
              1982
  MARCH
ESTIMATE
  1982
 CURRENT
ESTIMATE
  1982
ESTIMATE INCREASE +
 1983    DECREASE -
       1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Technical Information
& Liaison
 Salaries ft Expenses
 Research 8 Development

Monitoring Systems 8
Quality Assurance
 Salaries & Expenses
 Research ft Development

Health Effects
 Salaries ft Expenses
 Research S Development

Environmental
Engineering 8
Technology
 Salaries 4 Expenses
 Research 8 Development

Env1ronmental
Processes ft Effects
 Salaries ft Expenses
 Research 8 Development
$171.3
$5,9
$2,462.4
$2,769.5
$250.6
$196.1
$10.3
$2,773.4
$3,115.1
$42.6
$157.0
$196.1
$10.3
$2,576.0
$2,178.0
$42.0
$153.0
$19B.4
$1,905.1
$1,712.6
$172.0
$23.0
$69.9
$50.0
$1,807.7
$1,190.2
$16.5
$155.0
-$128. S
$50.0
-$97.4
-$522.4
-$155.5
$132.0
$1,359.8   $1,413.0   $1,041.4   $1,194.0   $1,001.2   -$192.8
$2,921.3   $5,371.3   $4,202.3   $3,675.9     $439.5 -$3,236.4
             $184.3
              $15.0
 $183.8
  $15.0
 $4B2.6
  $15.0
 $305.0
-$177.6
 -$15.0

-------
I
*-
                                                                HATER QUALITY

                                                           Industrial Hastewater Non-Energy

                                                        ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                                   1982       1982       1982            1983 VS 1982
TOTAL:
 Salaries 4 Expenses
 Research 8 Development

Industrial Wastewater  TOTAL
Non-Energy

PERMANENT FULL-TIME HORKYEARS
                                                                (DOLLARS IM THOUSANDS)
                                                      $3,993.5   $4,609.4   $4,039.3   $3,952.1   $3,200.3   -$751.8
                                                      $5,947.3   $8,668.7   $6,558.6   $5,426.5   $1,834.7 -$3,591.8

                                                      $9,940.8  $13,278.1  $10,597.9   $9,378.6   $5,035.0 -$4,343.6
Technical Information
S Liaison
Monitoring Systems 8
Quality Assurance
Health Effects
Environmental
Engineering 4
Technol ogy
3.2 3.1

44.8 42.9

1.0
26.1 20.1


3.1

36.9

1.0
8.2


3.1

26.1

1.0
8.2


1.1

20.3

.4
9.5


-2.0

-5.8

-.6
1.3


                   Environmental
                   Processes 8 Effects
                                                                         7.6
                                  3.8
                                -3.8
                   TOTAL PERMANENT WORKYEARS
                                       74.1
67.1
49.2
46.0
35.1     -10.9

-------
                                             WATER QUALITY

                                    Industrial Wastewater Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982




&
I
f:



TOTAL WORKYEARS
Technical Information
& Liaison
Monitoring Systems &
Quality Assurance

Health Effects ,.
Environmental
Engineer! nq 8
. Technol ogy

5.2 4.8 4.8 4.8 1.4 -3.4

61.7 59.6 53.6 40.4 31.6 -8.8


1.3 1.3 1.3 .7 -.6
30.1 26.7 14.8 14.8 13.6 -1.2


Environmental                                                           10.0        5.7      -4.3
Processes & Effects

TOTAL WORKYEARS                        97.0       92.4       74.5       71.3       53.0     -18.3

-------
                                  WATER QUALITY

                         Industrial Wastewater Non-Energy

Budget Request

     The Agency requests a  total  of $5,035,000 and 35.1  permanent  workyears for
1983, a decrease  of $4,343,600 and 10.9  workyears from  1982.   Included  in this
total is $3,200,300 for Salaries  and  Expenses and  $1,834,700 for Research  and
Development, with  decreases  of  $751,800  and  $3,591,800,  respectively.   The
decreases result from  the  completion  of research support for  the development of
effluent guidelines and monitoring methods for various types of industrial waste-
waters.

Program Description

     The goals of EPA's research and development efforts in the industrial waste-
water area are three-fold.  First, they address  current deficiencies  in existing
analytical  and monitoring  methods for  toxic  substances.   Research in  this area
is useful  because  some analytical methods  currently in use  remain incompletely
tested and are subject to  both legal  and scientific  challenges.  These research
efforts support the Agency's  policy  to enhance the  accuracy and reliability  of
our monitoring activities.   Second, they are aimed at providing a sound technical
and scientific data base for insuring the  dependability of Agency regulations and
policies.   Third,  they  attempt to  identify  for industry,  through  approaches
varying from data analysis to technology evaluations, lower cost and  more energy
efficient control  methods  for  complying  with  discharge  limitations  and  other
regulatory requirements.

TECHNICAL  INFORMATION AND LIAISON

     Refer to  the  Oxidants  Non-Energy  narrative  for  a  description  of  those
Technical  Information  and  Liaison  activities that  are common  to  all  research
and development  budget  sub-activities.   Activities  specific  to   this   budget
sub-activity are  indicated in the program  element description below.

1981 Accomplishments

     In 1981, the  Agency used  a  total  of  $177,200  and 3.2 permanent  workyears
for this program,  of  which $171,300 was  under  the Salaries and Expenses appro-
priation and $5,900 was for  extramural purposes under  the Research and Devel-
opment appropriation.

Specific accomplishments 1n the Industrial  Wastewater area included:

     -  Preparation and printing of a  revised TreatablHty  Manual for industrial
        wastewaters.

     -  Development of  a  summary  report entitled "Control  and Treatment  Techno-
        logy for  the Metal  Finishing Industry".

     -  Development of a report entitled "Environmental  Pollution Control
        Alternatives:   Centralized Waste Treatment Alternatives  for the Electro-
        plating Industry".

1982 Explanation  of Changes from January Budget Estimate

                       January      March        Current
                       Estimate     Estimate     Estimate
                       $206,400     $206,400     $198,400
                                    WQ-45

-------
     The net  decrease  of  -58,000  results  from  several  actions,  as  follows:

     - Congressional Actions.   (-58,000)   A  reduction  of -58,000  was  applied
       to the  Salaries  andExpenses  appropriation to meet Congressionally  man-
       dated appropriation levels.

     - Transfer Authority.   (No  Change)  The  net change  applied to  this  acti-
       vity is made up  of a decrease  of  -$10,300 from  Research  and Development
       and an  increase  of +510,300 to  Salaries  and Expenses for funding  of es-
       sential operating costs.

1982 Program

     In 1982,  the  Agency  is  allocating a  total   of  $198,400  and 3.1  permanent
workyears to  this  program,  all   of  which  is under  the  Salaries  and  Expenses
appropriation.

     The following specific products will  be developed in 1982:

     -  Toxicity  Reduction  Manuals  for  Industries  whose  effluents  have  high
        concentrations of priority pollutants.

     -  Research  summaries on treatment  methods; and  control  technologies  for
        the oil shale, coal and uranium mining industries.

     -  Analytical procedures for identifying toxic pollutants.

1983ProgramRequest

     The Agency requests a total  of $119,900  and 1.1  permanent  workyear  for this
program, of which  569,900  is  under the Salaries  and Expenses  appropriation and
550,000 is for extramural  purposes  under  the  Research and Development appropria-
tion.

     This reflects a decrease of 5128,500 and an increase  of 550,000, respectively.
The decrease results  from  planned organizational  changes for more efficient use
of personnel  and equipment.  The  increase will be used  to  employ private sector
firms to do  some  of  the functions,  which,  if  done  in-house,  would  cost  more.

     In 1983, the Technical Information and Liaison program will stress providing
the necessary technical  information to State and  local  officials fn  support  of
their increased role  in administering  environmental  program.   The  program  will
focus on:

     -  Providing information and  data on industrial effluents,  treatment methods,
        and control technologies  to State and  local  governments  as well as  to
        the industrial sector.

     -  Developing  a  system to  track the progress  of   research  and development
        projects.

MONITORINGSYSTEMS AND QUALITYASSURANCE

1981 Accpmpl i shments

     In 1981, the  Agency used  a  total  of  55,231,900 and  44.8 permanent workyears
for this program,   of  which 52,462,400  was  under  the Salaries and Expenses appro-
priation and $2,769,500 was for extramural purposes under the Research and Devel-
opment appropriation.

     Since many  Important policy and  funding  decisions  at local,   State,  and
Federal levels and  in private  Industry rely  on  data  obtained  from  sampling and
                                       WQ-46

-------
analyzing pollutants in wastewaters,  it  is important that such data  be  reliable
and accurate.  Data  accuracy  can be  assured  through the application  of quality
assurance techniques, auditing  the  performance  of  analytical  laboratories,  and
conducting performance  evaluations   of  individual  analyses.   These  activities
need to be carried  out  on  a continuing basis  to  assure  that  results  obtained are
of consistently good quality.

     In line  with  these  overall responsibilities,  the monitoring  and  quality
assurance program accomplished the following in 1981:

     -  Completed  reference method  validation  studies  for  the priority  pollu-
        tants and  identified  and corrected  deficiences in  currently  approved
        methods.

     -  Approved  alternate test procedures   for  the  National  Pollutant  Dis-
        charge Elimination System.

     -  Provided assistance to  the Office  of Enforcement in  the evaluation  of
        analytical performance of discharger laboratories.

     -  Managed technical  guidance,   support  and overview to  the Agency  Manda-
        tory Quality  Assurance   Program  to  ensure  that the  Agency  will  have
        environmental data of  known quality.

1982 Explanation of Changes from January  Budget Estimate

                       January       March         Current
                       Estimate     Estimate     Estimate

                      $5,888,500  $4,754,000   $3,617,700

     The net decrease of  -$2,270,800 results  from  several  actions, as  follows:

     -  January -• March.   (-$1,134,500)  This  change represented  a  decrease  of
     $1,134,500 from the January  budget, of which $197,400  was for Salaries -and
     Expenses and  $937,100 was   for  Research  and   Development.   This  decrease
     resulted in the elimination  of gas  chromatography/mass  spectrometry methods
     validation for compounds  .on the  Section 311  list, and of support  for evalua-
     tion of National Pollution  Discharge Elimination System  dischargers'  labora-
     tory analytical performance.

     "  Rep'"pgramming.  (-$394,000) A transfer  of $382,800  was made  to  perform
     chemical analysis  of samples  collected  during the  conduct  of transport
     and fate  research.   These   analyses   were  formerly  performed  within  the
     monitoring systems and quality assurance  activity.

        An Agency-wide reprogramrning  of  -$11,200 provided resources  for  transfer
     of the  accountability function   to  the  Office  of Management  Systems  and
     Evaluation and, in addition, provided  additional resources  for the Immediate
     Office of the   Assistant  Administrator   for  Solid  Waste  and  Emergency
     Response.  (The two reprogrammings above, totalling -$394,000 were  included
     in a letter to Congress on  December  16, 7981.)

     -  Congressional Actions.   (-$742,300) A  reduction of  -5271,300 was  taken
     against the March  estimate   reflecting the  September 125  reduction to  the
     Research and Development appropriation'.  A  large  portion  of this reduction
     reflects the  final  Congressional  action  on our  1982 Appropriation  Bill
     (-$217,300}.   The additional reduction will contribute to  the  decision  to
     delay research on the high  pressure liquid  chromatography/mass spectrometry
     system for monitoring toxic  materials  and to concentrate on gas chromatogra-
     phy/ mass spectrometry methods.   The delay causes minimal adverse effects  on
                                     WQ-47

-------
     current technology-based regulations  because  water quality criteria  pollu-
     tants are analyzable by current gas chromatography/mass  spectrometry methods
     (-354,000).

        An additional  reduction of  -$471,000  was applied to  the  Salaries and  Ex-
     penses appropriation to meet Congressionally  mandated appropriation levels,

     -  Transfer Authority.  (No Change)  The net change applied to this activity
     Is made up of  a  decrease  of -$194,100 from Research and Development  and an
     increase of +5194,100  to  Salaries and Expenses.  The Increase will provide
     for Tab supplies  and for service contracts on  existing analytical  instrumen-
     tation used in methods research.

1982 Program

     In 1982, the Agency is  allocating a  total  of  S3,617,700 and  26.1  permanent
workyears to this  program,  of which  $1,905,100 is  under the Salaries and Expenses
appropriation and  $1,712,600 is for extramural purposes under  the Research  and
Development appropriation.

     Planned program accomplishments in 1982 include:

     -  Methods  validation  studies  for  high  priority  wastewater   analytical
        procedures and evaluation of alternate test procedures  for the National
        Pollution  Discharge Elimination System.

     -  Quality assurance support includes:   Preparing  and maintaining  a reposi-
        tory of performance  evaluation samples,  conducting  performance evalua-
        tions, and distributing quality control samples.

     -  Provision   of  technical  guidance,  support  and  overview  to  the  Agency
        Mandatory  Quality Assurance  Program.

1983ProgramRequest

     The Agency requests a  total  of $2,997,900 and  20.3 permanent workyears  for
this program, of which $1,807,700 1s under the Salaries  and Expenses appropriation
and $1,190,200  is  for  extramural   purposes  under the  Research and  Development
appropriation.  This  reflects  a decrease  of  $97,400 and $522,400  respectively,
which resulted from a  reduced  need  for industrial  wastewater research  in support
of the Agency's development of  effluent guidelines.

     Many analytical methods currently  in use remain incompletely  tested and  are
subject to both legal  and  scientific challenges.   The 1983  program will seek to
correct these deficiencies  and to  improve the sampling and monitoring capabi-
lities to enhance the Agency's  monitoring program.   Specific outputs  include  the
following:

     -  Develop procedures  to correct deficiencies  in instrumental analysis  and in
        analytical  methods   for  a   number  of high  priority toxic   substances.

     -  Maintain quality assurance   sample  repository  for  support  of  Office  of
        Enforcement, Effluent Guidelines Division,  and  Regional  Office  regulatory
        needs.

     -  Support Regional  Office and  State performance evaluations.

     -  Support the development and  implementation of  EPA's  Mandatory Quality
        Assurance  Program.
                                     WQ-48

-------
HEALTH EFFECTS

1961 Accomplishments

     In 1981, the Agency used a total of $250,600  for  this  program, all  of which
was for  extramural  purposes  under the Research  and  Development  appropriation.

     In an effort to  relate  industrial  wastewater quality to human health impli-
cations, an  investigation  was  completed  in  1981  of  potential health  problems
resulting from reuse  of water  containing traces  of chemicals  and  pesticides  in
food processing industries.  EPA  will  use this information  in  regulatory actions
for the  food processing industries to  assure  that wastewater  reuse  systems  de-
signs will protect public health.

1982 Explanation of Changes froip[..January Budget Estimate

                       January       March         Current
                       Estimate     Estimate     Estimate

                       $199,600     $195,000     $195,000

     The net  decrease  of  -$4,600  results   from   several  actions,  as  follows:

     -  January - March.  (-54,600)  This change represented a  decrease of $4,600
     from the January budget,  of  which $600 was  for  Salaries and Expenses  and
     $4,000 was for Research and  Development.   This decrease had no  significant
     effect on this program.

     - Transfer Authority.   (No Change)  The net  change  applied to  this  activity
     is Mete up of  a  decrease  of  -$130,000  from Research and Development  and  an
     increase of +5130,000 to Salaries and Expenses to  fund  essential  operational
     costs.

1982 Program

     In 1982, the Agency is  allocating a total  of $195,000 and one permanent work-
year to this program, of which $172,000 is under the Salaries and Expenses  appro-
priation and $23,000 is for extramural purposes under the Research and  Development
appropriation.

     In 1982, the Health Effects program will determine the applicability of vari-
ous biological testing procedures   in assessing health-related toxicity of  indus-
trial  discharges.    Work  under  other programs  covers exploration and  development
of such testing procedures.   EPA  is  developing,  bioassay procedures to monitor
Industrial effluents for potential health effects.

1983 Program Request

     The Agency requests a  total  of $171,500 and  .4 permanent  workyear  for this
program, of  which $16,500  is under the Salaries  and  Expenses  appropriation and
$155,000 is for extramural  purposes under the Research  and Development appropria-
tion.   This reflects a  decrease of $155,500 and an  increase  of  $132,000, respec-
tively.  In  1983,  resources  have been shifted  from  Salaries and  Expenses  to
Research and Development.  This will allow  the Health  Effects  program to  employ
outside scientific experts to develop and improve biological testing  procedures.

     In 1983, Health  Effects research  efforts will determine  the  applicability
of various  bioassay  and  other  biologic/testing   procedures  for  detecting and
quantifying the human-health-related toxicity  of  complex industrial  discharges.
                                     WQ-49

-------
The results of this  research  will  be useful  in performing risk-benefit analyses
to quantify the  degree of  industrial  discharge control  required to  adequately
protect public health in downstream water supplies.

EJWIRQNHENTAlENGINEERING AND TECHNOLOGY

1981 Accomplishments

     In 1981, the Agency  used  a  total  of $4,281,100 for  this  program, of which
$1,359,800 was under the  Salaries  and  Expenses appropriation and $2,921,300 was
for extramural purposes under the Research and  Development appropriation.

     Major accomplishments of  the  Environmental  Engineering and  Technology pro-
gram in 1981 included:

     -  Provided data for the development of  effluent guidelines.

     -  Recommended  low-cost  process  modifications  to  several   steel  firms   to
        reduce wastewater volumes.

     -  Completed a revision of the Treatability Manual*

     -  Developed a water reuse technique for the  paper Industry.

     -  Conducted a  feasibility  study  on the use  of centralized  waste treatment
        plants for small businesses.

1982Explanation of Changes from JanuaryBudget Estimate

                       January       March        Current
                       Estimate     Estimate     Estimate

                      $6,784,300   $5,243,700   $4,869,900

     The net decrease of -$1,914,400 results  from  the following action:

     "  January-March.  (-$1,540,600)   This  change  represented a  decrease  of
     $1,540,600"from the January budget,  of  which  $371,600 was for Salaries and
     Expenses and $1,169,000  was  for  Research and  Development.   This decrease
     resulted in the phase-out  of  activities in support  of  regulations develop-
     ment, and reductions fn development of control  technology  for lower priority
     industrial wastewater sources.

     -  Congressipna 1 Actions.   (-$373,800)   An additional reduction of -$373,800
     was appl 1 ed to the Salaries  and Expenses ($271,300) and Research and Develop-
     ment ($102,500) appropriation to meet Congressionally mandated appropriation
     levels.

     -  Transfer Authpri ty.   (No Change)  The net  change applied to this activity
     is made up of  a decrease  of -$423,900  from Research and Development and  an
     increase of +$423,900 to Salaries  and Expenses.  The  increase will allow lab
     program reviews, monitoring  of extramural  projects, as well  as the conduct  of
     more program evaluation, and other critical expenses.

1982 Program

     In 1982, the Agency  is allocating  a total  of $4,869,900 and 8.2 permanent
workyears to this program, of which $1,194,000  is  under the Salaries and Expenses
appropriation and $3,675,900  is  for extramural purposes  under  the Research and
Development appropriation.
                                      WQ-50

-------
     In 1982, research  activities  are supporting the effluent  guideline regula-
tions program by  suppling  data  and  evaluating  control  technologies.   Specific
industrial categories of  concern are  those for which guidelines have  not  been
promulgated.  Control technology evaluations  include ion exchange,  dialysis  and
reverse osmosis.  Results will be used to develop effluent guidelines.

     Treatability research, including work on the toxlcity reduction concept,  will
continue to  support  State permitting  activities and enforcement  efforts.   This
work defines the efficiency,  reliability, and costs  of  various treatment techno-
logies for treating toxic pollutants.

1983 Program Request

     The Agency requests  a total of  $1,440,700  and  9.5  permanent workyears  for
this program, of which £1,001,200 is under the Salaries and Expenses appropriation
and 3439,500 is for extramural purposes under the Research and Development appro-
priation.  This  reflects  decreases  of  $192,800 and  $3,236,400,  respectively.
These decreases resulted   from the  completion  of  research  work  supporting  the
effluent guidelines program.

     In 1983, the Environmental  Engineering and  Technology program will  focus on
the following research and development activities:

     -  Develop low-cost treatment processes for small businesses.

     -  Evaluate control technologies  for Industrial  wastewaters containing  high
        concentrations of toxic pollutants.

     -  Investigate engineering  processes to reduce the amount  of  organic  chemi-
        cals getting into the waste stream.

     -  Develop cost-effective  methods  to  remove heavy  metals  from  Industrial
        wastewaters.

ENVIRPNHENTAL^PROCESSES AMDEFFECTS

1981 Accompl1shments

     There were no resources used by this program in  1.981.

1982 Explanation of Changes from January Budget Estimate

                       January       March        Current
                       Estimate     Estimate     Estimate

                       $199,300     $198,800     $497,600

     The net  increase  of  +$298,300  results  from several  actions,  as  follows:

     "  January -  March.   (-$500)   This change  represented  a  decrease of  $500
     from the January budget  all  of  which  was  for Salaries  and Expenses.   This
     decrease had no significant effect on the program.

     *  ReprojSS.iP.i'   (+$382,200)  The purpose of  this transfer is  to perform
     chemical a'n'alysis  of  samples  collected  during the conduct  of  transport
     and fate  research.   These  analyses   were  formerly  performed  within   the
     monitoring systems and quality assurance activity.

     ~  CongressionalActions.  {-$83,400)  A reduction of -$83,400 was  applied to
     the Salaries  ani Expenses  appropriation  to  meet  Congressionally  mandated
     appropriation levels.
                                      MQ-51

-------
1982 Program

     In 1982, the  Agency  Is  allocating a  total  of $497,600  and 7.6  permanent
workyears to this  program,  of which $482,600 Is under the Salaries and Expenses
appropriation and  $15,000   is  for  extramural  purposes  under the  Research  and
Development appropriation.

     In 1982,  research  efforts  in  the  Environmental   Processes and  Effects
program are concentrating on the following activities:

     -  Develop and  evaluate bioassay-type  techniques  to quantify the  combined
        toxicity of all the toxicants present.

     -  Provide screening tests to Identify possible toxic problems in industrial
        effluents.

     -  Develop a toxicity  unit concept for permitting  purposes.

     This research   will   be  used  to  evaluate  the  effectiveness   of  various
treatment processes  in terms  of  the ability  to reduce  toxicity In  industrial
wastewaters.  The  techniques  could,  of  course, also  be  used  to  monitor  the
effluents for compliance with permit requirements.  The  use of  such  techniques
would provide considerable  cost savings over the alternative  chemical-by-chemical
measurements.

1983 Program Request

     The Agency requests  a total  of $305,000  and  3.8 permanent workyears  for
this program, all  of  which  is  under the  Salaries and  Expenses  appropriation.
This reflects decreases of $177,600 and $15,000  respectively.  The completion  of
the initial phases  in the evaluation of environmental impacts of toxic pollutants
is reflected in these resource reductions.

     In 1983, the  Environmental Processes and  Effects  program will focus  on  the
following research  efforts:

     -  Evaluate available  acute and chronic  bioassay techniques for detecting
        toxic problems 1n industrial effluents.

     .  Provide analytical   techniques to  quantify the toxic  levels of  industrial
        wastewaters.

     -  Identify other  potentially toxic organic chemicals  found repeatedly  in
        effluents of many industries.

     Information from the  above  research  efforts  is needed  to  determine  which
toxic pollutants warrant  closer attention  and  to  evaluate  the  reliability  and
usefulness of the above-mentioned bioassay techniques for toxicity determinations.
The toxicity  characterizations  need  to  be  sufficient and  accurate   to  provide
inputs to mathematical models that predict fate and  transport of toxic  pollutants
for use In risk assessments.
                                     WQ-52

-------
Page Intentionally Blank

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                            WATER QUALITY

                               Water Quality State Programs Management
                                     ACTUAL
                                     1981
              JANUARY
             ESTIMATE
               1982
            MARCH
          ESTIMATE
            1982
 CURRENT
ESTIMATE
  1982
ESTIMATE INCREASE +
 1983    DECREASE -
       1983 VS 1982
PROGRAM
                                             IDOLLARS IN THOUSANDS)
State Programs
Management
 Salaries & Expenses
 Abatement Control 8
 Compliance

State Programs
Regulations S
Guidelines
 Salaries * Expenses
 Abatement Control 1
 Compliance

Great Lakes Program
 Salaries 8 Expenses
 Abatement Control S
 Compliance

Chesapeake Bay Water
Quality Study
 Salaries & Expenses
 Abatement Control &
 Compllance

NEPA Compliance/Els
Preparation
 Salaries ft Expenses
$10,668.3
 $5,632.8
   $124.8
 $1,813.0
   $176.5
         $5,292.5   $6,190.3   $9,661.4  $3,471.1
           $668.7   $3,142.0     $350.0 -$Z,792.0
            $8,195.5
            $2,543.1
   $751.7   $1,466.3   $1,461.5   $1,396.3   $1,313.5    -$82.8
 $6,876.9   $5,531.7   $2,531.7   $4,031.7   $2,500.0 -$1,531.7
$407.2     $404.9     $373.2
$600.7     $600.7   $1,600.7
                     -$373.2
                   -$1,600.7

-------
I
Ol
*-
                 TOTAL:
                  Salaries 8 Expenses
                  Abatement Control A
                  Compliance

                 Water Quality State
                 Programs Management
TOTAL
                                                             WATER QUALITY

                                                Water Quality State Programs Management

                                                      ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                                 1982       1982       1982            1983 VS 1982

                                                              (DOLLARS IN THOUSANDS)
           $11,721.3  $10,069.0   $7,158.9   $7,959.8  $10,974.9  $3.015.1
           $14,322.7   $8,675.5   $3,801.1   $8.774.4   $2,850.0 -$5,924.4
$26,044.0  $18,744.5  $10,960.0  $16,734.2  $13.824.9 -$2.909.3
                 PERMANENT FULL-TIME WORKYEARS
State Programs
Management
State Programs
Regulations &
Guidelines
Great Lakes Program
Chesapeake Bay Water
Quality Study
NEPA Compllance/EIS
Preparation
TOTAL PERMANENT WORKYEARS
257.2 84.5
172.5
15.0 14.5 14.5
3.5 4.8 4.8
5.2
280.9 191.8 103.8
78.7 200.0 121.3

14.5 10.8 -3.7
4.8 -4.8

98.0 210.8 112.8

-------
                                            HATER QUALITY

                               Water Quality State Programs Management

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
TOTAL HORKYEARS
State Programs
Management
State Programs
Regulations 8
Guldell ires

324.0 131.3 122.9 254.4 131.5
223.3
Great Lakes Program                    20.0       20.5       20.5       20.5       15.0      -5.5
                                                                                     1
Chesapeake Bay Mater                    4.3        5.8        5.8        5.8                 -5.8
Quality Study

NEPA CompHance/EIS                     5.4
Preparation

TOTAL HORKYEARS                       353.7      249.6      157.6      149.2      269.4     120.2

-------
                                  WATER QUALITY

                      Water Quality State Program Management

Budget Request

     The Agency requests  a total  of 313,824,900 and  210.8  permanent  workyears
for this subactivity,  of which  $10,974,900  is under  the  Salaries and  Expenses
appropriation and $2,850,000  is  under  the  Abatement,  Control  and  Compliance
appropriation.  The  decrease  of  $2,909,300  is  attributable  to  a reduction  in
the Great Lakes Program  and the completion of the Chesapeake Bay Program.   This
restructured subactivity reflects the transfer  of several  programs from Municipal
Source Control, including  oversight of the  interagency  agreement with  the  U.S.
Army Corps  of Engineers,  delegation  management,  and the  wastewater  treatment
training program.  Decreases of $2,792,000 occur  in  oversight activities for 106
funding, delegation management,  completion  of  the Flathead EIS,  and  elimination
of the wastewater treatment training program.

Program Description

     This area provides for the overall management of  State  financial  assistance
programs and  other  local  programs  for  water  pollution  control. This  includes
oversight of State  implementation of Section 205(g) construction  grants manage-
ment delegation agreements and  water quality management  programs  under  Sections
106, 201,  205(j),  208, and  303  of the Clean  Water Act. The  subactivity  also
provides for administration of  an interagency  agreement with the  U.S.  Army  Corps
of Engineers;  support  for  training of  water  pollution  control  personnel;  and
administration of the Great Lakes and Chesapeake Bay programs.

     For Agency  budgetary  purposes,   these  activities  are  divided   into  three
program elements:

     State Programs Management — This program includes monitoring and oversight
of State activities  to implement negotiated agreements under  Section 205(g)  of
the Clean Water Act, which  provides  for phased transfers of delegable construction
grants project and  program management activities.   This  program also  includes
management and oversight  of water  quality  management programs  authorized  under
Sections 106, 201,  205(j),  208, and 303.

     This program also includes  administration  of the  interagency agreement  with
the Corps  of  Engineers,  and  training  programs  to meet  professional  manpower
development and training needs  of wastewater treatment plant operators  and  EPA,
State, and private  sector  personnel.   Federal  support  to Section  208  grants  was
terminated in  1982.   The  Agency  is  not  requesting  support  for  wastewater
treatment plant operator training in 1983.

     Great Lakes Program — This  activity  includes  funding  for the  Great  Lakes
program and demonstration grants authorized by Section 108(a) of the  Clean  Water
Act.  The Great Lakes National  Program  Office was established  in  1978  to integrate
and consolidate EPA  Great  Lakes  activities  and to provide support to  the Inter-
national Joint Commission (IJC) complying with  the 1978 U.S.-Canada Water Quality
Agreement.  In 1983, the program will focus  on support of  our  international agree-
ments.

     Chesapeake Bay Program—  The  Chesapeake  Bay  Program was  developed  in
response to  a  Congressional  mandate  requiring  EPA to  conduct a  study of  the
Chesapeake Bay.  The objectives  of the  study  were define the  factors adversely
affecting the  environment,  develop  research  to  address  adverse  factors,   and
define management strategies  to ameliorate  degradation  in the  Bay  attributable
to pollution.  The program has been developed through a cooperative effort between
the affected States and local  governments and EPA.
                                      WQ-56

-------
STATE PROGRAMS MANAGEMENT

1931 Accomplishments

   - In 1981, the Agency obligated $16,301,100 and 257.2 permanent  workyears for
this program activity, of  which  $10,668,300 was under the  Salaries  and  Expenses
appropriation and $5,632,800  was  for extramural purposes  under the  Abatement,
Control and  Compliance  appropriation.  These resources  were used to  administer
delegated construction grants management, water quality management,  and financial
assistance programs.

     Principal 1981  funding priorities  for Section  106 grants  included  second-
round NPDES  permitting and permit compliance,  ambient  and intensive  site moni-
toring, development of  data  bases  and  analytical  laboratory capabilities,  and
development of management capabilities in nondelegated States for the construction
grants program.

     A total of $167,800,000 in Section 205(g) funds was obligated by 45 delegated
States.  Grants totaling $51,170,700  were  awarded  under  Section 106  to  support
priority State and  other  agency  water pollution control programs.   Final  grants
totaling $33,497,900  were   awarded  to  State  and  designated  areawide  agencies
under Section 208 for development of nonpoint source control programs.

     During 1981,   seven  additional   States  signed  Section  205{g)  delegation
agreements, bringing  the  total  to 45  delegated States.   By the  end of 1981,
a total of 12  States  achieved full delegation of construction grants management.
States provided 1,960 workyears  of the  staff  resources committed to  management
of the construction  grants  program,

     EPA funded  several   multiyear projects  to  provide  wastewater  management
training materials,  to  assure uniformity  in  certification testing, and  to help
trainers remain current in professional  developments.

1982 Explanation of Changes from JanuaryBudget Estimate

                       January       March        Current
                       Estimate     Estimate     Estimate

                         ....       $5,961,200   $9,332,300

     The net increase of  +$9,332,300 results  from  several actions, as  follows:

     -  Restructuring.  (+$5,961,200)  This restructuring  establishes  a  new pro-
     gram element which  would facilitate  recent decisions delegating construc-
     tion grants and  minor water  quality responsibilities to -the  States.   The
     program management activities  will   be a mix  of  Federal-State involvement
     over the  next  several years.  These  resources  intially will enable  EPA to
     fulfill its role in coordinating the States'  activities in order to ensure
     that reasonable progress is  made toward meeting national  goals.-

     ~  Reprogramming.   (-$170,600)   During  the development of  the  operating
     pi an, several   miscellaneous reprogrammings,  which  are  not  reportable  to
     Congress, were made  to this  activity and  resulted  in  a  net decrease  of
     -$170,600.                              ;

     '  C ongressi onalActions.   (+$3,531,200) A reduction  of  -$134,500 was taken
     against The"Warch  estimate  reflecting  the September  12%  reduction  to the
     Abatement, Control  and  Compliance  appropriation  for the following  activi-
     ties: (1) a habitat evaluation in  four stream  segments  in  support of water
     quality standards; (2) Grant Management and technical  assistance activities
     for agricultural  nonpoint  source pollutants;  and  (3)  an interagency agree-
     ment with  the  water  quality management  program.  Periodic  review  of the
     Best Management Practices for forestry will be  eliminated.
                                      WQ-57

-------
        The Congressional   add-on  to  this  activity  was  +$1,478,000   applied
     against the  Salaries  and  Expenses  appropriation  and  +$2.625,000  applied
     against the  Abatement, Control  and Compliance  appropriation  for  manpower
     planning and training.

        A reduction of -$437,300 was applied to the Salaries and Expenses to meet
     Congressionally mandated appropriation levels.

     -  Transfer Authority.  (+$10,500)  The net  increase applied to this activ-
     ity i nc1udes an  increase  of +$10,500 to  Salaries and Expenses  for  funding
     of essential operating costs.

1982 Program

    In 1982, the  Agency  is allocating  a total  of $9,332,300 and  78.7 permanent
workyears to this program,  of  which $6,190,300 is for Salaries  and  Expenses and
$3,142,000 is for extramural purposes under the Abatement, Control and Compliance
appropriation.

     During 1982, EPA is making a major  effort  to  reorient  management  of the
water quality program and assure  enhanced program  performance with a lower Federal
resource base.   The major  focus  will  be placed  on negotiating  financial  assis-
tance agreements with States.  The  program will  be oriented toward improving the
water quality in  stream  segments  where designated uses  are impaired and State
standards are attainable.

     EPA will work  with  the States to  implement  construction  grants legislative
reforms enacted by  the Congress  in 1981.  Regulatory  and administrative reforms
will be incorporated in State delegation agreements and in EPA's program policies
and procedural   guidance.   These  efforts will  ensure maximum flexibility  for the
States in  administering  the  program  and  encourage  greater emphasis  on  water
quality considerations in State project funding decisions.

     Grants totaling $51,200,000 have  been allocated  for award  under Section 106
of the Clean Water  Act to  support  State water pollution control  programs.  Prin-
cipal activities  include reissuing 570 major Best  Available   Technology (BAT)
permits, development  of  State  pretreatment programs,   performance  inspections  of
over 3,500 major  dischargers,  and  continuing   support  for State  monitoring and
waste load allocation needs.

     Program management efforts will focus on  coordinating and  integrating water
quality programs' objectives,  outputs,  and  funding  mechanisms.   EPA and State
program managers  will negotiate  annual  program  priorities  and  accomplishment
commitments; Agency personnel  will  provide feedback and  assistance  based  on the
results of annual on-site  visits.   These efforts will provide essential  links to
ensure that Federal  and  State  objectives,  priorities, and funds  are meeting the
most critical water quality  needs through the most   cost-effective approaches.

     A total  of $101,034,600 will  be  obligated under  Section 205(g)  to delegated
States to  support their  management of projects  funded  under  the  Construction
Grants Program,   These funds are made available to delegated States as set-asides
from their allotments of construction  grants  funds in the  amount of $400,000 or
45, whichever is greater.

     During 1982, one additional  State is  expected   to  accept  initial  Section
205(g) delegation,  bringing to  46 the total  of  partially  and  fully delegated
States.  By the end  of 1982, 14  States should have  achieved full delegation of
responsibility for  the  program.    Based on current estimates,  the   States  will
commit 2,215 workyears to  management  of delegated management activities  in the
construction grants  program.

     Assuming all States obligate  all  eligible funds, the Agency anticipates a
total of $24,400,000 could be obligated by States  under Section 205(j) for support
                                     WQ-58

-------
to water  Duality  management  planning.   These  funds  are  made  available to  the
States as  set-asides  from their allotments  of  construction grants funds  in  the
amount of $100,000 or 1%, whichever is greater.

     A total  of $330,000 in  extramural  funds  is  projected  for  obligation  for
the Congressionally mandated funding of the Flathead River,  Montana,  Environmental
Impact Statement.

     The Agency will propose to the Congress the revisions  needed to  reauthorize
the Clean  Water Act.  Current  regulations  and  program policies  will  also  be
revised to  simplify and  streamline Federal  requirements and to make  optimum  use
of available financial  assistance.

     Management of remaining Section 208 grants will be  conducted by  State agen-
cies.  EPA will  continue  to  ensure  that construction grants  and National  Pollutant
Discharge Elimination System (NPDES)  permits  awarded by EPA and States are cpnsis-
tent with  approved State  water quality  management plans  and that  States  are
maintaining effective  continuing  planning  processes   required  under  the  Act.

     Beginning in 1982, EPA  will look to the States to establish their own training
activities supported by funding available particularly  under Section 205(g).   The
Agency did not request funding for this program in 1982.  The Congressional  add-on
of $1,478,000 for  Salaries  and  Expenses for waste water treatment  training  will
be used to  pay  the severance costs associated  with elimination of the program.
Congress also mandated  $2,625,000  in  water quality  manpower  training  grants.
The Agency intends to develop  a  cooperative agreement with a national organization
to provide  site-specific training at  problem  facilities to  improve  operator
performance.

1983Program Reguest

     In 1983, the  Agency  requests  $10,011,400 and  200.0 permanent  workyears  for
this activity, including $9,661,400 under the Salaries  and  Expenses  appropriation
and $350,000  under the  Abatement, Control  and Compliance appropriation.   The
increase of 121.3  permanent workyears  reflects  the  restructuring  of this program
element.  Activities  shifted  from Municipal Source Control  include delegation
management and  oversight  of  the  interagency  agreement  with the  United  States
Army Corps  of Engineers.  The increase  of  $3,471,100 in Salaries  and  Expenses is
the net transfer for the  above  activities.   A decrease  of  $1,478,000  in Salaries
and Expenses  is associated  with  the termination  of  the wastewater  treatment
training program.    The  net  decrease  of $2,792,000 in Abatement,   Control  and
Compliance reflects the termination of the wastewater treatment  training program,
completion of funding for the Flathead  River Environmental  Impact  Statement,  and
Increased extramural support for the Agency's State program management activities.

     A total  of 46  States  will have accepted delegation  of some  construction
grants management  activities.  The Agency anticipates that the States will  obli-
gate $85,909,000  in  205(g)  funds  in  1983.  EPA does  not  expect any additional
States will accept initial delegation of construction grants management authority
in 1983.  However,  a  total  of 25 States are  expected to achieve  full delegation
during the year.   States are  projected to commit  a total  of 2,300 workyears or
70% of the total construction grants management staffing in 1983.

     EPA also will  work   with all  States an their  use  of  Section  205(j)  funds.
These funds  will  help the  States  meet their  priority water quality management
needs including assessing pollution  control  needs,  reviewing and revising  water
quality standards, and conducting planning studies.   Assuming all  States obligate
all eligible  funds,  an anticipated total  of up to $24,400,000 will  be  obligated
for support to water quality management planning under  Section 205(j).

     During 1983,  EPA  will  renegotiate   Section  205(g)  delegation  agreements
with the States, eliminating requirements,  where appropriate,  based  on statutory,
regulatory, and administrative  reforms.  This  will provide the States  with  the
maximum degree  of  flexibility to  carry out the delegated program.  The  Agency
                                     WQ-59

-------
will continue to work with  each  partially delegated  State to  accelerate the rate
and level  of  delegation  leading  to  full  program  management  responsibility.

     Grants totaling $40,845,600 are expected to  be  awarded under Section 106 to
State and interstate agencies  for priority  water  polution control  activities  not
covered under Sections 205(g)  or 2Q5(j)  of the  Clean Water Act.  National prior-
ities for Section  106  grants  in 1983  will  include reissuance  of  over  600 major
BAT permits, compliance inspections and compliance assurance of major dischargers,
support to  States  in  pollutant  data  collection  and  development of  analytical
laboratory capabilties,  and  wasteload  allocations  for  water  quality  limited
water body segments,

     EPA will concentrate  more heavily  on  achievement of overall  water quality
and public health results than on tracking and reporting of specific quantitative
outputs.  Management and technical  assistance will be provided Regions and States
as appropriate.   Negotiations will  be  conducted  during the  year to  establish
joint program and  funding priorities for 1984,  oriented to maintaining effective
Statewide planning  and  management  processes to  meet  attainable  water  quality
standards, including both conventional and  other  pollutant control requirements,
and further  reducing direct   Federal  program  management of  State  activities.

GREAT LAKESPROGRAM

1981 Accomplishments

     In 1981, the  Agency obligated $7,628,600  and  15.0 permanent workyears  for
this program, of which $751,700  was  for the Salaries  and Expenses appropriation
and $6,876,900 for the Abatement, Control and Compliance appropriation.

     In 1981, the  Great  Lakes National  Program  undertook several new  steps  to
fulfill the terms  of the United States-Canada  Great Lakes Water  Quality Agree-
ment, particularly In the areas of toxicant  control and nonpoint source pollution.
Some accomplishments include:

       - Implemented, with  the cooperation  of  the eight  Great Lakes  States,  a
         coordinated fish monitoring strategy  to  determine levels and  trends  of
         toxic contamination in Great Lakes fish.

       - Compiled  an inventory  of municipal  phosphorus  loadings to  date (the
         inventory revealed  a major  reduction  in phosphorus  loads)  and provided
         technical  assistance  to  improve   plant  performance  to  meet  the  1983
         deadline.

       - Provided technical  and financial assistance to assess the extent of toxic
         contamination in the Niagara River.

       - Surveyed sediments  in 17 harbors and river mouths on the Great Lakes to
         determine possible sources and trends of toxic contamination.

       - Developed and  negotiated  a United States-Canada phosphorus  management
         strategy to further  reduce loadings  with  emphasis  on  cost-effective,
         voluntary controls for nonpoint sources.

       - Participated in a  comprehensive international evaluation of  the effec-
         tiveness of toxic   substance  control  programs  within  the  Great  Lakes
         basin.

1982 Explanation of Changes from January Budget Estimate

                       January       March        Current
                       Estimate     Estimate     Estimate

                      $6,998,000   $3,993,200   $5,428,000
                                     WQ-60

-------
     The net decrease of  -$1,570,000 results  from several actions,  as  follows:

     -  January - March.   (-$3,004,800)   This  change  represented a  decrease  of
     $3,004,800  frojn the  January  budget,  of  which  $4,800 was for  Salaries and
     Expenses and  $3,000,000  was   for Abatement,  Control and Compliance.   Re-
     maining resources will be devoted  to  carrying   out functions of the inter-
     national agreement.   This  reduction  eliminated  the  following:    Section
     108(s) demonstration  grants to  test   new  or  innovative  wastewater tech-
     niques, water intake  and  high  flow tributary monitoring to  determine water
     quality trends and pollutant  loadings  to  the Lakes,  research vessel  opera-
     tions with  contractual  scientific  crews,  support  to other EPA  programs,

     -  Congressional Actions.    (+$1,434,800)  A  Congressional   add-on  to  this
     activity of +$1,500,000 was applied to the Abatement, Control and Compliance
     appropriation reflecting final  action on our 1982  Appropriation Bill.   An
     additional reduction  of -$65,200 was  applied to the Salaries  and  Expenses
     appropriation to meet Congressionally mandated appropriation  levels.

1982 Program

     In 1982, the Agency is allocating $5,428,000 and 14.5 permanent workyears to
this program, of which  $1,396,300  is  for  the Salaries and Expenses appropriation
and $4,031,700 is for extramural purposes under the Abatement, Control and Compli-
ance appropriation.

     The major focus of this program continues to be  directed toward support  of
the United States-Canada Great  Lakes Water Quality Agreement.   Program highlights
include:

       - Trend  analysis  will  continue  to  establish baseline   toxics  data  by
         sampling air,  fish and sediments  throughout the  Lakes.

       - An agricultural nonpoint source control  initiative will  be undertaken in
         the Lake  Ontario  basin  in  cooperation  with  the  States  and the  United
         States Department of Agriculture,  with  particular emphasis  on  voluntary
         control  of phosphorus  from nonpoint sources.

       - The Lake  Erie  and Huron  Intensive Survey Reports will be completed and
         published.

       - Implementation plans  to  further  control  phosphorus in  Lake   Erie  and
         Ontario will be developed  as part  of  the  phosphorus  management  strategy
         with the States and other Federal  agencies.

1983 Program Request

     The Agency requests  a total  of $3,813,500 and  10.8  permanent workyears,  of
which $1,313,500 is  for Salaries  and  Expenses and $2,500,000 1s  for Abatement,
Control and  Compliance.    This  is   a  decrease of  $1,614,500  and 3.7  permanent
workyears, which  will   be sufficient  to  maintain  a United States  focus  for
activities of the  United  States Government under  the Great  Lakes Water Quality
Agreement.

     The Great  Lakes  National  Program  will   respond  to  International   Joint
Commission (IJC) information requests and  provide technical  assistance  to Head-
quarters and  the  State  Department  on  official   Canadian   requests  and  notes
concerning United  States  Great  Lakes policies.  The compliance of United  States
industrial and municipal dischargers with the  International Agreement objectives
will be assessed and reported to the IJC.

     Staff support and  technical  assistance to  the  Water Quality Board and its
committees will  continue  to insure that  United States  views  and  policies are
                                     WQ-61

-------
    accurately represented.   A  Great  Lakes  surveillance  program  to  detect  toxic
    substances in Great Lakes fish znd sediments  will  be  conducted in 20 tributaries
    and 10 harbors, respectively.

         Results will  be analyzed and reported to the States for regulatory followup.
    The atmospheric deposition sampling network will  be maintained and  data analyzed
    to determine loadings  to the  Lakes  of organic  chemicals,  nutrients,  and  heavy
    metals.  A sampling network  and  strategy to monitor  the  trophic status  of Lake
    Superior will be designed.

CHESAPEAKE BAY WATER  iljyLTY STUDY
    1981 Acc^ojnpl i shments

         During 1981  the Agency obligated $1,937,800 and 3.5 permanent workyears,  of
    which $124,800 was  for Salaries and Expenses  and  $1,813,000 was for  Abatement,
    Control and Compliance.

         The program completed many of the studies initiated  in  1978 and  initiated  the
    comprehensive effort to  integrate the  results  of research  so that  management
    decisions at all  government levels can  be based  on  a  capability to  assess  the
    consequences of pollutant loadings on the Chesapeake Bay.

         The toxic substances study  effort  extended  the baseline  inventory of  the
    abundance and distribution  of toxics  in  Chesapeake Bay  sediments,  pore  water,
    water column, and biota  from  major tributaries.   These efforts were designed  to
    allow identification of the flux of materials  between the  Chesapeake Bay and  the
    subestuaries.  Comprehensive research tasks were assessing  both natural  and man-
    made sources of  toxic  chemicals in  sediments,  water,  and   biota  and determining
    their rates  of  transport and  transformation  within the  system.  Study  results
    serve to delineate options to  reduce environmental  hazard.

         The bay grasses study  effort  addressed  the impact of  water  quality  factors
    upon Submerged Aquatic Vegetation  and  living  resources  known or  suspected to  be
    dependent upon that vegetation.  The role  of bay grasses was determined  relative
    to their relationship to  fish and wildlife, their nutrient dynamics and  the impact
    of man-induced factors  (herbicides,  turbidity) suspected to  be involved  in  the
    decline in  grass  populations.   Results  provide a  knowledge base  on which water
    quality control   alternatives  can  be developed  for the  enhancement  of  submerged
    vegetation and associated living resources.

         Eutrophication (nutrient  enrichment)  studies  assessed  the  nutrient  loadings
    to the Bay system and  the impact of those loadings  on the ecosystem.

         To reach  the  overall  goals   of  program   synthesis   and  integration,   the
    program used a  segmentation approach designed  to  define the Chesapeake Bay  in
    manageable units.  Natural  and  cultural  parameters were displayed geographically
    to identify  similar regions and to  assess the health  of  various segments.   As
    work was  completed  in  the program  areas,  intermediate  reports  were  prepared
    supporting the segmentation analysis by providing  both qualitative and  quanti-
    tative information  on   the  relationship  to  the  ecosystem  of  the  parameters
    intended for use in the analysis.

    1982 Explanation of Changes from January Budget Estimate

                           January       March        Current
                           Estimate     .Estimate     Estimate

                          $1,007,900   $1,005,600   $1,973,900

         The net  increase  of +$966,000  results  from  several   actions,  as  follows:
                                         wq-62

-------
     "  January - March.  (-52,300)  This change represented  a  decrease  of  $2,300
     from the January budget for Salaries and Expenses.

     -  Congressional Actions.  (+$968,300)  A Congressional  add-on  to  this  activ-
     ity of  +51,000,000 was  applied to the  Abatement,  Control  and Compliance
     appropriation reflecting final  congressional  action  on our 1982 Appropria-
     tion Bill.  An  additional  change of -$31,700 was applied  to the  Salaries
     and Expenses  appropriation  to  meet  Congressionally mandated  appropriation
     levels.

1982 Program

     In 1982, the Agency  is  allocating $1,973,900  and 4.8 permanent workyears  to
this program,  of  which 5373,200 is  for  Salaries and Expenses and $1,600,700  is
for Abatement, Control  and Compliance.

     In 1982, the Chesapeake Bay  Program will complete its integration  of research
in the areas of toxic pollutant effects,  submerged aquatic vegetation, and eutroph-
ication.  This will  include completion  of all technical  studies,  integration  of
their results, and use  of the ecological  segmentation  concept  discussed above  to
assess existing information  about the biological, chemical,  physical,  and cultural
aspects of the Chesapeake Bay.   Major accomplishments and outputs will  include:

     Chesapeake Bay Primer:   Explains important ecological  relationships and  will
serve as a reference for the following reports.

     Synthesis Report:   Summarizes  and  explains the technical  knowledge  gained
from the research projects funded by this program in the areas of toxic  substances,
nutrients, and submerged aquatic vegetation.  It provides an  understanding  of the
processes which affect  the environmental  quality of the Chesapeake  Bay.

     Chesapeake Bay Characterization:  Assesses trends in water quality and  living
resources over time and examines the correlation or relationship between the  two.

     Chesapeake Bay Modeling:   Describes the  three  major  modeling   studies
described under "1981 accomplishments."

     Management Alternatives:  Identifies control  alternatives for agriculture,
sewage treatment  plants, industry,  urban runoff, and constructtpw$ estimates costs
and effectiveness of different approaches to remedy "hot  spots?"

1983 Program Request

     Information developed during the course of the 5-year Chesapeake Bay  study,
which was completed in  1981, will  be disseminated  in 1982.   No further  resources
are needed to complete the Agency's commitments in this area.
                                      WQ-63

-------
                                            WATER QUALITY

                                   Effluent Standards & Guidelines

                                     ACTUAL    JANUARY     MARCH
                                     1981     ESTIMATE   ESTIMATE
                                                1982       198Z
                                   CURRENT   ESTIMATE INCREASE +
                                  ESTIMATE    1983    DECREASE -
                                    1982            1983 VS 198Z
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Effluent Standards J
Guidelines
 Salaries 8 Expenses
 Abatement Control 8
 Ccmpl 1 a nee

TOTAL:
 Salaries t> Expenses
 Abatement Control §
 Compl lance

Effluent Standards *   TOTAL
Guidelines
 $5,780.4   $6,333.9   $5,831.9   $5,165.6   $4,785.5   -$380.1
$22,392.7  $12,913.9  $10,237.8   $6,578.5   $7,448.6    $870.0
 $5,780.4   $6,333.9   $5,831.9   $5,165.6   $4,785.5   -$380.1
$22,392.7  $12,913.9  $10,237.8   $6,578.5   $7,448.5    $870.0
S28,173.1  $19,247.8  $16,069.7  $11,744.1  $12,234.0    $489.9
PERMANENT FULL-TIHE HORKYEARS
Effluent Standards 8
Guidelines

TOTAL PERMANENT WORKYEARS
    113.4


    113.4
100.0


100.0
85.0


85.0
78.7


78.7
68.4     -10.3


68.4     -10.3

-------
                                                                MATER QUALITY

                                                           Effluent Standards S Guidelines

                                                        ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE     1983     DECREASE -
                                                                   1982       1982       1982             1983 VS 1982
                   TOTAL WORKYEARS


                   Effluent Standards *                   142.1      131.3       116.3       108.0       93.4     -14.6
                   Guidelines

                   TOTAL WORKYEARS                        142.1      131.3       116.3       108.0       93.4     -14.6
£

-------
                                  WATER QUALITY

                        Effluent Standards and Guidelines

Budget Request

     The Agency requests  $12,234,000  and 68.4 permanent  workyears  for 1983,  an
increase of $489,900 and a decrease of 10.3 permanent  workyears  from 1982.  Inclu-
ded in  this  total  is $4,785,500  for  Salaries and Expenses  and $7,448,500  for
Abatement, Control  and  Compliance,  with  a  decrease  of $380,100 and  an increase
of $870,000 respectively.  The decreased  resources reflect  the  Agency's progress
in developing effluent standards and guidelines.

Program Description

     This subactivity  includes  establishing  economically   achievable effluent
limits for industries discharging directly  to waterways  and indirectly through
Publicly Owned Treatment Works (POTWs).

     Section 304(b) of  the  Clean Water  Act  requires  promulgation  of  guidelines
for effluent limitations, setting forth the  degree of  effluent  reduction attain-
able by  industrial  dischargers  through  the  application  of  best  practicable
technology (BPT),  best  conventional technology (BCT) and  best  available technol-
ogy (BAT).

     Similar requirements exist for new  industrial dischargers.  EPA  is required
to develop new source performance standards (NSPS)  under Sections 304(c) and 306,
based on best available demonstrated technology.   Section  306 also  requires these
new industrial dischargers to comply with NSPS.

     For discharges to  POTWs,  EPA is  required to develop pretreatment standards
under Sections 304(g),  307(b),  and  307(c) of the Act.  Indirect discharger com-
pliance with these  standards  is  the  responsibility  of the  POTW  under Section
307(b) and is  implemented through  its National  Pollutant  Discharge  Elimination
System (NPDES) permit issued under Section 402.

     Each regulation requires  examination of industrial processes, water  usage,
wastewater characteristics,   and  treatment  technologies  in use  or  potentially
applicable.  The requirement  for economic  achievability  has led  the Agency  to
conduct extensive studies of the  financial  and economic achievability  of  regula-
tory options.  These options are examined separately to determine the  possibility
of closures and for  impacts  on production levels, employment,  industry size and
concentration, foreign  trade,  regional economics, and  the  economics of  related
industries.

     EPA was unable to promulgate many of these regulations  by the  dates contain-
ed in the Act.  In  1976,  EPA was Sued by several environmental  groups; the out-
come was  a Settlement  Agreement.  EPA  was  required  to  develop  a program  and
adhere to a  schedule  for 21  major industries  with 37  industry  categories  and to
promulgate BAT  effluent  limitations  guidelines,   pretreatment  standards,  and
NSPS for  65  "priority"  pollutants  and  classes  of   pollutants.   (See  Natural
Resources Defense Council, Inc. V. train, 8  ERC  2120  (D.D.C.   1976), modified
March 9, 1979.) the 1977  Amendments to the  1972  Act incorporated elements  of the
Settlement Agreement related  to toxic pollutant  control.   Section 301(b)(2)  of
the Act now  requires the  achievement  by  July 1,  1984  of effluent limitations re-
quiring application of  BCT for conventional  pollutants and BAT for toxic  pollu-
tants, including the  65 "priority" pollutants and classes of  pollutants  which
Congress declared toxic under Section 307(a)  of the  1972  Act.  Likewise,  NSPS
and pretreatment  standards   were  redirected  toward  toxic  pollutant controls.

     Because the Agency was  unable  to meet  deadlines  contained  in  the Settlement
Agreement (to date, regulations have been proposed for 13  industrial categories),
the Agency moved to  modify dates contained  in the Agreement.   As a  result,  12
                                     WQ-66

-------
regulations-will  be  proposed  and  11  regulations  will  be  promulgated in  1982.
Eleven regulations will be promulgated in 1983, and two during 1934.

EFFLUENT STANDARDSAND GUIDELINES

1981 Accomplishments

     In 1981 the  Agency  obligated a total  of $28,173,100 for this  program,  in-
cluding $5,780,400 for the  Salaries and Expenses  appropriation,  $22,392,700  for
the Abatement,  Control  and  Compliance appropriation.   Contract  resources were
used for technical  analytic studies,  economic and statistical analyses,  health
effect determinations, and environmental  exposure and  risk analyses.   In addition
to the principal  work on BAT  guidelines,  pretreatment standards and  NSPS, 1981
program accomplishments included:

     -  Completion of technical studies for the development of all proposed regu-
lations except organic chemicals  and plastics and synthetics as  well  as  comple-
tion of economic  studies  for development  of  proposed regulations for eight  in-
dustries.

     -  Publication of proposed  regulations establishing  national  effluent limi-
tations and standards for six  industries mandated by the NRDC Settlement  Agree-
ment and the  1977  Clean  Water  Act.  Publication of the final  effluent standards
for the timber industry.

     -  Continued  investigation  of  priority  pollutant  discharges into and from
POTWs.  The results will  continue  to guide the Agency's approaches  to  implement-
ing pretreatment policies and  programs,  to determining sludge disposal  methods,
and to re-examining standards for wastewater discharges from POTWs.

     -  Continued  development   of  regulations  for  best  management   practices
(BMP's),  RCRA-related hazardous  sludges, and  best  conventional technology (BCT).

     -  Initiated study on the  oil  and gas extraction  industry to  obtain data  for
developing a court-ordered New  Source Performance Standard.   The  study, conducted
in cooperation with industry,  is characterizing wastes from oil   and gas  extrac-
tion platforms and is examining technology performance and costs.

     -  Continued  support to the small business community by  providing informa-
tion on financial  assistance available for complying with water  quality  regula-
tions (pursuant to Section 8 of  the  Clean  Water Act)  and by  attempting to  miti-
gate the impact  of regulation on  small  business  through the implementation  of
the Regulatory Flexibility Act.

1983 Explanation of Changes  from January Budget Estimate

                     January         March          Current
                     Estimate       Estimate       Estimate

                   $19,247,800     $16,069,700    $11,744,100

     The net decrease  of  -$7,503,700  results  from several actions, as  follows:

     "  January- March.   (-$3,178,100)   This  change  represented a decrease  of
     $3,178,100ofwhich  $502,000  was for  Salaries and  Expenses and  $2,676,100
     was for  extramural  support  reflecting decreases in litigation support  and
     regulatory development  costs.

     -  Congressional  Actions.    (-$4,325,600)   A  reduction  of  -$2,728,200  was
     taken against the  March  estimate reflecting  the  September 12%  reduction
     to the Abatement, Control  and  Compliance appropriation.  The  program will
     not fund new  studies of the  synfuel  industry.  Analytical   support  for  the
     analysis of  influents  and effluents  will be  reduced.   The publicly  owned
                                     WQ-67

-------
     treatment works  study  will  be  reduced  in scope.  Economic  and  statistical
     analyses will be reduced.   Identification of organic  chemicals,  other than
     the 129  priority  pollutants  in  ambient  water  quality  samples,  will  be
     stretched out.

        An additional reduction  of -$1,597,400 was  applied to the  Salaries and
     Expenses ($739,300) and Abatement,  Control  and  Compliance ($858,100) appro-
     priation to meet Congressionally mandated appropriation levels.

     -  Transfer- Authority.  (No Change)  The net change applied  to this activity
     is ia"
-------
     -  Continue  investigation  of the  fate  and effects  of toxic pollutants  in
PQTWs to  determine  treatment  needs of  industrial  sources discharging through  a
municipal plant and  to support  development  of pretreatment programs,,   Combined
Sewer Overflow (CSQ) samples are  being  taken  to determine the toxics  released  in
CSO events.

     -  Provide technical,  economic and  statistical  support  for post  proposal
and promulgation negotiations.

1983 Program[Request

     The Agency requests a total  of $12,234,000 and 68.4  permanent workyears  for
this program,  of  which $4,785,500  for the  Salaries  and Expenses  appropriation
and $7,448,500 is for  the  Abatement,  Control  and  Compliance appropriation.   This
is a decrease  of  $380,100 and  an increase of  $870,000  respectively, which  re-
flects the  Agency's  progress  in  developing   effluent  standards and  guidelines.
In 1983, the program will—

     Complete Regulatory Requirements

     -  Promulgate regulations  for  11  effluent guidelines.  Regulations  for  two
additional industries will  be made final in early  1984.   The Agency will  evaluate
public comments;  re-examine  the  administrative record;  review  data bases  for
statistical validity to  ensure  that  regulations  are statistically  defensible;
complete Regulatory Impact Analyses and other analyses as required by E.Q. 12291;
collect additional data as necessary; determine environmental benefits;  estimate
social  costs;  complete all economic  impact studies and complete  cost effective-
ness measures in support  of regulations to be issued.

     -  Complete study of, and  develop  NSPS  for,  the  oil  and gas  extraction  in-
dustry as required by a separate settlement agreement  with the American Petroleum
Institute and the  Natural  Resources Defense Council.

     Assist State  Control  Efforts

     -  Provide expertise  gained in the  promulgation  of effluent guidelines  to
State and EPA permit writers who  are responsible  for  implementing the guidelines
in NPDES  permits  through  industry-specific   consultation.   Assistance  will   be
provided to permit writers for  analyzing  and  interpreting information on treata-
bility of  toxic  compounds,  conventional  pollutants  cost  tests,  controls  for
toxic pollutants not covered  by national regulations,  and  controls for facilities
that include manufacturing processes not covered by national  standards.

Improve Regulation Development

     -  Conduct analyses to aid  small entities affected  by  regulations developed
by the Ageney.   Efforts will  focus on lessening the impact  of regulatory actions
on the small business sector.

     -  Provide technical,  statistical, and  economic support  to  post-proposal/
promulgation negotiations.
                                     WQ-69

-------
                                                               MATERIALITY

                                                           Grants  Assistance Programs

                                                       ACTUAL     JANUARY      MARCH      CURRENT    ESTIMATE  INCREASE  +
                                                       1981     ESTIMATE   ESTIMATE    ESTIMATE     1983     DECREASE  -
                                                                   1982        1982        1982             1983  VS 1982
                  PROGRAM
                                                                (DOLLARS  IN THOUSANDS)
.a
~^i
o
Glean Lakes Program
 Abatement Control &
 Compl1 anee

Control Agency
Resource
Supplementation!106
Grants)
 Abatement Control *
 Compliance

Areawlde Haste
Treatment Management
Resources
 Abatement Control &
 Compliance

Training Grants
 Abatement Control &
 Compliance

TOTAL:
 Abatement Control 4
 Compl 1 ance

Grants Assistance
Programs
                                                    $11,064.8   $11,500.0
$9 ,"000.0
-$9,000.0
                                                    $51,170.7   $53,300.0   $51,200.0   $51,200.0  $40,845.6 -$10,354.4
                                                    $33,497.9
                                                     $2,068.9
  $500.0
  -$500.0
                                                    $97,802.3   $53,300.0   $51,200.0   $60,700.0  $40,845.6 -$19,854.4
                                          TOTAL     $97,802,3   $64,800.0   $51,200.0   $60,700.0   $40,845.6  -$19,854.4

-------
                                             WATER QUALITY

                                        Grants Assistance Programs
                                     ACTUAL    JANUARY
                                     1981     ESTIMATE
                                                1982
                   MARCH
                 ESTIMATE
                   1982
                  CURRENT   ESTIMATE INCREASE +
                 ESTIMATE    1983    DECREASE -
                   1982            1983 VS 1982
TOTAL HORKYEARS
Control Agency
Resource
Supplementation!106
Grants)
5.0
7.1
TOTAL HORKYEARS
S.O
7.1

-------
                                  WATER QUALITY

                            Grants Assistance Programs

Budget Request

     The Agency  requests  a total  of  $40,845,600 for  1983 under the  Abatement,
Control and Compliance  appropriation.   Included  in  this  total  is a decrease  of
$10,354,400 in  grants  for State  water pollution control   programs under  Section
106; the  phase-out  of  Section  104  Training  Grants,  which  represented  a  non-
recurring 1982  Congressional  add-on  of $500,000  for academic  training;  and  a
decrease of $9,000,000 for the Clean Lakes program.

Program Descri pti on

     Federal assistance to the States  for water quality and pollution  abatement is
covered in  four programs: 1)  clean  lakes grants under  Section 314,  2)  program
grants under Section 106,  3)  planning grants under  Section 208,  and 4) training
grants under Section 104.

    Clean Lakes Program — Under the Clean Lakes Program,  financial  assistance is
provided to States  to  classify their  publicly owned fresh water  lakes according
to trophic condition and to carry out methods  and  procedures to restore and  protect
the quality of the lakes.

    Control Agency Resource Supplementation — Section 106 grants supplement State
resources for  water pol 1 ution  control  programs.  They  are  negotiated  annually
with 50 States,  7 territories,  and  6  interstate  compact agencies.    Funds  have
been directed to cover a  wide  range  of water quality programs including permits,
enforcement, monitoring, construction  grants  program  management, oil  and hazardous
materials spill response,  planning, nonpoint  source control,  pretreatment,  ground
water management, and other priority programs.

     States are also accepting delegation of responsibility for management  of the
Construction Grants program.  Primary funding is  provided  under Section 205(g) for
construction grants management  and Section  205(j)  for water  quality  management
planning activities.
            ^      Treatment Management Resources — The Clean Water Act provides
for financial support  of State and designated areawide  water  quality management
planning agencies  under  Section 208.   Section  208 grants  have been  awarded  to
all States  and   140  designated  areawide  planning  agencies  for  development  of
planning programs  which  address identified water  quality  management priorities.

    Training Grants — Training assistance  is provided  to  institutions of higher
education and other  public  or private agencies  and institutions to  meet profes^
sional manpower  needs.   Efforts  in  this  area  include  professional  graduate
training, State  agency  fellowships,  undergraduate training  grants,  curriculum
development, and  other  special  training  projects in  critical areas  of  water
pollution control .

CLEAN ..LAKE?

1981 Accompl i shments

     In 1981, $11,064,800  was obligated from the Abatement,  Control  and Compli-
ance appropriation  under  the  Clean  Lakes Program  Cooperative  Agreements  to
initiate the  following  activities  in 39  States:   7  Classification  Surveys,  49
Diagnostic/Feasibility Studies, and 25 Implementation Projects.
                                     WQ-72

-------
1982 Explanation of Changesfrom January BudgetEstimate

                      January         March        Current
                     Estimate       Estimate       Estimate

                   $11,500,000        	         $9,000,000

     The net decrease  of -$2,500,000 results  from several actions, as  follows:

     -  January - March.   (-$11,500,000)  this  change  represented a decrease  of
     $11,500,000 from  the January  submission.   It  terminated  the  Clean  Lakes
     grants program.

     ~  Congressional Action.   (+$9,000,000)   A  Congressional  earmarked  add-on
     to this activity was  +$9,000,000 and  was applied to  the  Abatement,  Control
     and Compliance appropriation.

1982 Program

     The Agency  is allocating  through  a  Congressionally  add-on $9,000,000  in
Abatement, Control and  Compliance to  bring the program to an end as  intended  by
the Congress and  complete  the highest priority  of the  32  eligible implementation
projects currently underway  in the  Clean Lakes  Program.   The funds provided will
be allocated according to the following  priority criteria: (a)  the actual  ability
of additional  funding  to  complete  the  program;  (b)  the  degree  to  which  funds
would support  in-lake restoration activities;  (c) proximity of the  lake  project
to a standard  metropolitan  statistical  area;  and (d) certification by State and
Regional offices  that  additional  project funding  is appropriate and  necessary.

1983 Program Request

     In 1983, the Agency requests no funds  for the Clean  Lakes Program.   In past
years, the Agency  has developed and demonstrated  lake  restoration techniques and
assisted States  in  classifying  lakes,  identifying  the most suitable  techniques
for restoring  the level  of water  quality needed to maintain or enhance use, and
actually implementing cleanup and control projects.  Since the Agency  has  provided
guidance to the  States  on maintaining  clean  lakes,  it believes that the  States
are now able to address lake restoration needs, along with other local  priorities,
under their water quality management programs.

CONTROL AGENCY RESOURCE SUPPLEIIENTATION  (Secti on 106)

1981 Accompli shments

     In 1981, $51,170,700 was obligated for Section 106  grants under the Abatement,
Control and  Compliance  appropriation,  matched by  over  $100  million  in  State
resources.  State activities funded  under Section 106 included  National  Pollutant
Discharge Elimination  System (NPDES) permitting,  ambient  and intensive  source
monitoring of  toxics and conventional  pollutants, compliance  assurance, oil and
hazardous materials  spill  response,  nondelegated  States'  construction  grants
program management, general  planning, water quality  standards  reviews, training,
nonpoint source  control  programs  management,  and  State programs  administration.

    Reflecting Federal   financial  assistance   levels  and  the  extent  of  State
delegation of construction grants  programs, Section 106 funds represented  approx-
imately 33 percent of overall expenditures for water pollution  control  activities
by States.  With support provided  by Section 106 grants:

     -33 delegated  States  issued  and   reissued  6,500  permits,  and  conducted
      compliance assurance activities under NPDES; the other States  assisted EPA
      in most  aspects   of  permit  issuance.   The States conducted  over  3,200
      compliance inspections and initiated over 1,400 actions.
                                     WQ-73

-------
     -16 States  developed toxics  analytical  laboratory capability  to  support
      appropriate toxics control approaches and water quality  standards reviews.

     -All States progressed in  implementing  Basic Water Monitoring  Programs  with
      special emphasis  on use  of  intensive  surveys in  assessing problems  and
      developing solutions.

     -States maintained base  program  levels for developing and updating waste  load
      allocations, operator training  and  operations and maintenance  activities,
      emergency response,  nonpoint  source control  programs implementation,  and
      State program administration.

1982 Explanation of Changes from January Budget Estimate

                      January         March        Current
                     Estimate       Estimate        Estimate

                   $53,300,000    $51,200,000    $51,200,000

     The net decrease of -$2,100,000  results  from the following action:

     •  January - March.   (-$2,100,000)   This change represented  a  decrease  of
     $2,100,000 from the  January submission,  all  of  which was for Abatement,
     Control and  Compliance.    It  included a  decrease  of  $7,100,000 previously
     identified with comprehensive ground  water program  development offset by an
     increase of $5,000,000 for other emerging and ongoing State point  and  non-
     point source control activities.

1932 Program

     In 1982 the Agency is allocating  $51,200,000 for Section 106 grants under the
Abatement, Control and  Compliance  appropriation.   For  1982, greater  emphasis  is
being placed on Best Available  Technology (BAT) permitting, municipal facilities
compliance assurance activities, and establishment of State  pretreatment programs.

     The emphasis  in  negotiating State  financial  assistance  will  focus on  the
adoption by States of attainable water quality standards and use classifications,
and on the protection of those designated uses.  The Agency will work  with States
to assure that predominant local factors  are  identified and considreed  by States
in determining water quality  based numerical  criteria.  These criteria  will  be
applied appropriately in NPDES permitting and POTW decision-making  to  assure  that
only essential  limitations are incorporated  in  industrial  permits,  municipal
permits, and  construction grants  resulting   in  more cost-effective  public  and
private investments for pollution control.

     Support to  nondelegated  construction grants program  management activities
will continue to decrease as one additional State accepts delegation under Section
205(g).  Two additional States also are expected to accept  delegated NPDES autho-
rity.  With support provided by Section 106 grants:

     -approximately 570 major discharger  BAT permits, including toxics controls,
      will be issued or reissued;

     -over 3,500  compliance  inspections  will be   conducted   and  nearly  1,600
      compliance assurance actions  initiated  concentrating  primarily on municipal
      facilities compliance;

     -5 States will establish pretreatment programs;

     -16 States will maintain toxics  analytical  capability  to  incorporate toxics
      criteria in water quality standards reviews and revisions;
                                      WQ-74

-------
     -14 States will implement significant nonpoint source control  programs based
      on recommendations in water quality management program plans;

     -All States will maintain ongoing  basic  municipal  facilities  operations and
      management programs,  emergency  response   capability,  and  program  admin-
      istration support.

1983 Program Request

     In 1983 the Agency  requests a total  of  $40,845,600 for Section  106  grants
under the  Abatement,  Control  and  Compliance appropriation.   This represents  a
decrease of $10,354,400 from the  1982  level, reflecting decreased Federal require-
ments associated with regulatory reform activities  and the  availability of funds
under Section 205(g) and 205(j) of the  CWA.   Section  106 grants are supplemented
in States  with  available Section 205(g)  funds  and Section  205(j)  funds.   These
funds help States maintain base level  water quality program operations.

     In 1983, financial  assistance program emphasis  will  continue to  focus  on
priority water  segments, the  adoption  by States  of  attainable   water  quality
standards and use  classifications,  and the protection of those designated uses.
The Agency will  work with  States  to  assure  that  predominant  local  factors are
identified and considered by  States  in determining  water quality based numerical
criteria.  These criteria will be  applied appropriately in  NPDES  permitting and
POTW decision-making to  assure that  only  essential limitations are incorporated
in municipal  and  industrial  permits  and in  construction  grants,  and  to  assure
more cost-effective public and private investments for pollution control.

     Section 106 grants  in  1983  will  continue  to emphasize State  water quality
based program needs, including reissuance of  permits  with BAT  and  other control
requirements, source monitoring,  development  of data  bases  and analytical  labo-
ratory capability,  and compliance assurance, especially for municipal  facilities.

AREAWIDEHASTE TREATMENT MANAGEMENT (Section 208)

1981 Accomplishments

     In 1981, the  Agency obligated  533,497,900  for Section  208 grants under the
Abatement, Control  and Compliance appropriation.   Final grants were  awarded to 140
State and designated areawide  planning agencies targeted  to projects with greatest
water quality need  and demonstrated potential  for plan implementation.

     National priorities for grant  awards emphasized the major identified nonpoint
source control   needs (including  urban  runoff,   agricultural  runoff,   and  ground
water protection),  and  the  Identification of self-financing  approaches by- State
and local  management  agencies to  support  and oversee implementalon  of approved
point and  nonpoint source control programs.   1981  program  highlights included:

     -assisted local governments  initiate cooperative intergovernmental approaches
      to pollution  control;

     -provided assistance  to  State   and  local   governments  to  identify  cost-
      effective financial and institutional approaches to implement needed source
      control programs;  and

     -assisted passage  and  implementation of   over  400  State laws  and  local
      ordinances for point and nonpoint source pollution control.

1982 Program

     Funding of this program was  terminated in 1981.  Mo  funding was requested for
this program in 1982 or 1983.
                                     MQ-75

-------
     Although no funds are being  requested,  EPA  is encouraging  local  governments
to continue voluntarily to be  involved in bringing decision making closer to where
the problems are.  Section 205{j) funds will  be  allocated to  States to negotiate
urith local governments to clean up priority water bodies.
TRAINING GRANTS (Section 104)
1981 Accomplishments
     In 1981, the Agency obligated $2,068,900 for  this program under the Abatement,
Control and Compl iance appropriation.  Emphasis was placed on funding the develop-
ment of training guides and curricula in  areas including treatment plant operations
and management  and  the  fiscal and  financial management  techniques  associated
with development and implementation of water quality management  programs.
1982 Explanation of Changes  from January Budget Estimate
                      January         March        Current
                     Estimate       Estimate       Estimate
                                                   $500,000
     The net increase of +$500,000 results  from the following action:
     -  Congressional Actions.  (+$500,000) A Congressional  add-on to this activ-
     ity of +5500,000 was applied to the Abatement, Control  and  Compliance appro-
     priation for academic training grants.
1982 Program
     A Congressional add-on  of $500,000  in  Abatement,  Control  and Compliance will
be used to support environmental fellowships.
1983 Program Request
     We are requesting no funds for these grants  1n 1983.
                                       WQ-76

-------
                                             WATER QUALITY

                                Water Quality Strategies Implementation
                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                19B2       19B2       1982            1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Dredge And Fill
 Salaries 4 Expenses
 Abatement Control i
 Compl1 anee

Ocean Disposal
Petml ts
 Salaries * Expenses
 Abatement Control 8
 Compliance

Regulatory
Environmental Impact
Statement Preparation
 Abatement Control &
 Compl1ance

Environmental
Emergency Response *
Prevention
 Salaries A Expenses
 Abatement Control 4
 Compliance
$2,147.3   $2,881.6   $2,614.8   $2,336.3   $2,145.2   -$191.1
$1,306.7   $1,246.5     $539.9     $348.9     $344.9^   -$4.0
  $985.3   $1,085,6   $1,084.2   $1,069.7   $1,223.4    $153.7
  $128.2   $3,294.0   $3,128.0   $2,037.0   $2,343.2 ^ $306.2
  $500.0
$4,533.7   $4,285.1   $4,230.8   $3,939.8   $4,030.9     $91.1
$4,232.6   $2,058.3   $1,991.3   $1,999.3   $1,593.0 / -$406.3

-------
I
~J
00
Standards 8
Regulations
 Salaries S Expenses
 Abatement Control 4
 Compl1ance

EPA 011/Hazardous
Substances Spill
Projects
 Salaries S Expenses

TOTAL:
 Salaries & Expenses
 Abatement Control 4
 Compllance

Water Quality
Strategies
                                                            WHIR QUALITY

                                              Water Quality Strategies  Implementation
                                                     ACTUAL    JANUARY
                                                     1981      ESTIMATE
                                                                198Z
                                                           MARCH
                                                         ESTIMATE
                                                           1982
                                   CURRENT
                                  ESTIMATE
                                    1982
                  ESTIMATE INCREASE +
                   1983    DECREASE -
                         1983 VS 1982
                                       TOTAL
                                                             (DOLLARS  IN  THOUSANDS)
                                                   $2,493.4    $3,913.6    $3,217.1    $2,894.3    $2,839.9    -$54.4
                                                     $924,9    $1,030.2      $424.0      $273.1      $339.2     $66.1
                                                      $30.2
                                                  $10,189.9  $12,165.9  $11,146.9  $10,240.1   $10,239.4      -$.7
                                                   $7,092.4   $7,629.0   $6,083.2   $4,658.3    $4,620.3    -$38.0
$17,282.3  $19,794.9  $17,230.1  $14,898.4  $14,859.7    -$38.7
                PERMANENT FULL-TIME WORKYEARS
                Dredge  And Fill
                                       63.4
                80.7
74.3
68.3
55.3
-13.0

-------
Environmental
Emergency Response $
Prevention
                                             MATER QUALITY

                                Water Quality Strategies Implementation

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
Ocean Disposal
Permits
Environmental
Emergency Response 8
Prevention
Standards &
Regul at Inns
EPA Oil /Hazardous
Substances Spill
Projects
TOTAL PERMANENT HORKYEARS
TOTAL WORKYEARS
Dredge And Fill
Ocean Disposal
Permits
•2-1.8
108.6
58.6
1.0
253.4

69.9
26.5
24.0 24.0 23.3 24.3 1.0
91.5 91.5 89.0 82.3 -6.7
83.5 63.2 60.6 55.9 -4.7

279.7 253.0 241.2 217,8 -23.4

85.7 78.7 72.7 58.2 -14.5
28.7 28.7 27.7 29.1 1.4
118.4
100.3
100.3
97.3
90.7
-6.6

-------
JO
lo
o
                                                                WATER QUALITY

                                                   Water Quality Strategies Implementation

                                                        ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                                   1982       1982       1982            1903 VS 1982
                   Standards &
                   Regulations

                   TOTAL WORKYEA^S
 76.6
292.4
 94.2
308.9
 81.6
77.6
69.3      -8.3
289.3      275.3      247.3     -28.0

-------
                                  WATER QUALITY

                     Water Quality Strategies Implementation

Budget Request

    The Agency requests a total of $14,859,700 and 217.8 permanent  workyears  for
1983, a decrease of $38,700 and 23.4  permanent workyears  from 1982.  Included in
this total is $10,239,400 for Salaries and Expenses and $4,620,300 for Abatement,
Control and Compliance.

Program Description

    The water  quality  strategies  implementation  subactivity  covers the  Dredge
and Fill program,  Ocean Disposal Permits  program, Environmental Emergency Response
and Prevention program, and the Standards and Regulation program,

    Dredge and Fill — National management and program development regulating  the
discharge of  dredge  or  fill   material  (under Section 404  of the Clean  Water
Act) is carried  out  under this program.   Specific activities include  State  404
program development with  the goal of program transfer to the States, review of  404
permits for their  conformity  with  the 404(b)(l)  guidelines,  coordinating 404-
related activities with  other Federal,  State  and  local  agencies, and  review of
environmental impact  statements with dredge or fill  implications.

    Ocean Disposal — The Ocean Disposal  program  includes  the regulation of ocean
disposal by outfalls and  by dumping,  designation of disposal  sites,  development
of ocean-related policies,  and participation  in  interagency programs  that deal
with development of  ocean  resources.   The ocean  disposal  programs  authorized by
the Marine Protection,  Research and Sanctuaries Act  (MPRSA) of 1972 and the Federal
Water Pollution Control  Act,  as  amended,  have  been  in  operation since  1973.

     The Convention  on Prevention  of Marine Pollution  by  Dumping  of Wastes  and
Other Matter,  known  as the London  Dumping Convention  (LDC),  was  negotiated in
London in 1972 and came into force on August 30, 1975.  The United  States  is  one
of the Contracting Parties (member nations) to the  LDC, and  the EPA Ocean Dumping
regulations and criteria  are in compliance with these international  requirements.

      To carry out ocean disposal permitting functions, the  Administrator  of  EPA
is authorized to regulate the  disposition of all materials  except dredged material
(which is regulated by  the Corps of Engineers).  (MPRSA  prohibits the transporation
and dumping in ocean  water of chemical, biological, and  radiological warfare agents
and high level radioactive materials.)  EPA has statutory responsibility for desig-
nating all ocean dumping  sites, including those for dredged  material.

      In 1981, the Agency obligated $500,000 in the Abatement, Control and Compli-
ance appropriation to  prepare  Environmental   Impact  Statements  as part of  the
dumpsite designated process.  Those resources, formerly budgeted  under  the  Regu-
latory EIS  Preparation program  element, have been  moved  into  Ocean  Disposal*

    Environmental  Emergency Response --  The  objective  of   EPA's  Environmental
Emergency	R'esponse	ana'Prevention  program is to  protect public welfare, property
owners, and the environment from the hazards associated with  accidental  releases
of oil  and  other  petroleum products  to navigable waters  of the United States,
as mandated by  Section 311 of the Clean  Water  Act.  EPA shares  responsibility
for this  program  with the United  States  Coast  Guard,  which addresses  those
incidents in coastal  areas and the Great Lakes.

     Activities in support of  the objective are numerous.  The Agency operates  and
maintains a 24-hour  capability to  receive and respond to notifications of acci-
dental spills or threat of releases.   Federal  removal  is  directed at major inci-
dents where the responsible party  is  unidentifiable, refuses to clean  up,  or is
incapable of  providing timely,  adequate removal  and where the States  and  local
                                     HQ-81

-------
authorities lack  the  necessary  expertise,  equipment  or  funding.   Removal  by
responsible parties  and  State  and  local  governments  is also  monitored  by EPA to
ensure that cleanup  is adequate.   Federal  regulations require the implementation
of Spill  Prevention,  Control  and  Countermeasure  (SPCC)  plans  at  oil  storage
facilities and  transfer points  that could  reasonably be  expected  to spill  a
significant amount  of oil  into the  waters of the  United States.  Regional  EPA
staff, with assistance from  contractor  personnel,  conduct compliance inspections
at selected  non-transportation related  (NTR)  facilities  included in  the  SPCC
program, in an effort  to reduce the frequency and  volume  of releases  that occur.

    EPA also maintains an  Environmental  Response Team  (ERT)  to  provide Regional
and State personnel  with response  training  and  on-site technical  and  operational
assistance at complex emergency incidents.   The ERT is staffed by personnel with a
high degree of expertise in the areas of  spill control and removal, spill sampling
and analysis techniques, and damage assessments.

    Regional response  capability  is  augmented  through the Technical  Assistance
Team (TAT)  contract.   This  contract  provides  contractor  workyears  to  assist
Regional staff and the ERT in  responding to  Section 311 spills and environmental
emergencies.  A new contract  is now being negotiated.  Prior to 1982,  this program
included 1.0 permanent workyear and  $30,200  for response  activities  associated
with hazardous  substances  spills  and hazardous waste  site incidents  under the
EPA Oil/Hazardflus  Substances  program element.   With the  passage of the  Compre-
hensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA),
these response activities were transferred to the Superfund program.

    Standards and Regulations — This program includes development and publication
of water quality standards, regulations, and related guidance and development of
water quality criteria under Sections 304(a) and 307{a)  of the  Clean  Hater Act.
These criteria are to reflect the latest  scientific  knowledge  on the kind and
extent of all identifiable effects of toxic pollutant on human health and aquatic
life.  Protocols are developed to provide  scientific and  technical  guidance to
States on methods for developing criteria which reflect site-specific conditions.
EPA provides assistance to the States in applying these protocols.  Assistance in
the development and review of State water quality standards 1s provided to ensure
that attainable uses  and appropriate  criteria are established, based  on national
policies and guidelines.

DREDGE AND FILL

1981Accomplishments

     In 1981, the  Agency obligated $3,454,000  for this program.  Of  this  amount,
$2,147,300 was for Salaries  and  Expenses appropriation and  $1,306,700 for Abate-
ment, Control and  Compliance appropriation.  The  major emphasis  for  the dredge
and fill program was State 404 program development.   Program development grants
were  made to eight  states.   In  addition,  EPA initiated  a  review of the program
in order to  streamline requirements  for  transfer  to the States.  Other accom-
plishments for this  program  included  reviewing   over  10,000 Section  404 permits;
reviewing over  300 environmental   impact  statements  with  dredge or fill  impli-
cations; and finalizing the Section 404(b)(l) guidelines.

1982 Explanation of Changes from January Budget Estimate

                      January         March        Current
                     Estimate       Estimate       Estimate

                    $4,128,100     $3,154,700     $2,685,200
                                     WQ-82

-------
     The net decrease  of  -$1,442,900 results  from  several  actions, as  follows:

     •  January - March.   (-$860,500)   This  change  represented  a  decrease  of
     $860,500 from the  January submissioni  of which  $153,900  was for  Salaries
     and Expenses and $706,600  was  for Abatement, Control and  Compliance,   this
     reduction postponed the development of a dredge and fill  activity management
     information system and reduced  assistance to States in the development  of a
     Section 404 program.

     "  Restructuring.  (-$112,900)   With the restructuring  the  majority of these
     resources associated  with Dredge and Fill activities are now under the itianage-
     iient of the Office of Federal  Activities.  The  remaining  resources are being
     moved to Standards and Regulations.  These  resources  will provide  for the
     development and implementation  of technical  criteria» for review  and comment
     on permit application from the  Corps of Engineers, or the States.

                    g.  (-$151,400)   During the development of the operating plan,
     several miscellaneous reprogrammings, which are not  reportable  to  Congress,
     were made to  this activity  and  resulted in  a net  decrease of  -$151,400.

     -  Congressional Actions.  (-$342,200)  A reduction  of -$139,100  was  taken
     against the March  estimate  reflecting  the  September  12%  reduction to  the
     Abatement, Control and Compliance appropriation.  Funds for  one interagency
     agreement with  another  Federal  agency  will  be eliminated.   Funds for  one
     State grant will  be  eliminated,   The balance of the cut will be  applied to
     program contracts.

        An additional reduction of *$203,100 was  applied  to the  Salaries and Ex-
     penses ($164,100) and Abatement,  Control  and Compliance ($39,000)  appropri-
     ation to meet Congressional ly mandated appropriation levels.

     -  Transfer Authority.   (-i-$24,100)  The net  change  applied to this activity
     is made up of an  increase  of $24,100 to Salaries and Expenses for essential
     operating costs.

1982 ;_Pro_gram

     In 1982, the Agency  is  allocating a total of  $2,685,200 and 68.3 permanent
workyears to this program, of which  $2,336,300 is  for the  Salaries  and Expenses
appropriation and $348,900 is for  extramural  purposes under the Abatement, Control
and Compliance appropriation.   In 1982, the  Agency  will  continue  its emphasis on
State 404 program development.   It  is possible that the  first  State  assumption
grants will be made  to  several  additional States.  EPA will also finish stream-
lining requirements  for program transfer to the States.   EPA will work to expand
opportunities for state involvement  in 404 activities.   In  addition,  the Agency
expects to  review  over 10,000  Section 404 permits and 300 environmental  impact
statements with dredge or fill implications.

1 983 Program R gguest

     The Agency requests  a total  of  $2,490,100 and 55.3  permanent workyears for
this program, of which  $2,145,200 is  for the Salaries  and Expenses appropriation
and $344,900 is for extramural purposes under the Abatement,  Control and Compliance
appropriation. This  is a decrease  of 13.0 permanent   workyears and  $195,500,
S191.100 of which is in Salaries and  Expenses and  $4,000 is in  Abatement, Control
and Compliance.  The Agency's major effort in this  area will be to significantly
increase State involvement in the 404 program, whether through program transfer
in some cases  or developing  a  formal  role  for States  unable to accept program
transfer in the  near  future.  In addition,  the  Agency  expects  to  review  over
8,000 Section 404 permits and 250 environmental impact statements with  dredge or
fill implications.   The program will  concentrate  on those  actions with the most
significant environmental  consequences.
                                      UQ-83

-------
OCEAN DISPOSAL,, PERMITS PROGRAM

1981 Accomplishments

     In 1981 this program obligated $1,113,500.   Of this amount, $985,300 was for
the Salaries and Expenses  appropriation  and  $128,200 for the Abatement,  Control
and Compliance  appropriation.  This  included  support  for the  development  of
impact statements for ocean  disposal  site designation.   The program accomplished
the following;

     -  Designated  four  sites, two  for  municipal  sludges  and  two for  dredged
materials.

     -  Prepared impact  statements  as part of the dumpsite designation process.

These resources  were  budgeted under the  Regulatory  EIS  Preparation  program
element.  The 1981  obligations  for this  activity were $500,000 under  the Abate-
ment, Control and Compliance appropriation.

     -  Reviewed environmental  impact  statements for offshore oil  and  gas lease
sales and participated in  the design  of  permit  conditions  for oil  and  gas dis-
charges in Georges  Bank. The program  is  actively involved  in  designing environ*
mentally based effluent limitation controls for  marine-based enterprises  such as
ocean thermal energy conversion and deep  seabed  mining.

     -  Initiated the review of the  ocean dumping  regulations in  response to a
recent District  Court  decision which  ruled  that  the Agency  must  consider  the
comparative risks of land- versus  ocean-based disposal  before  precluding  the  use
of the  ocean  medium.   The  review  will consider  the integration  of marine waste
management practices in  the  Agency's  waste management  program and  focus  on  the
development of  a waste  characterization and  basic  physical  measurements.   It
will also focus  on the  surveying and designation  of ocean sites for the safe
disposal of municipal  and industrial wastes.

1982 Explanation of Changes from January  BudgetEstimate

                      January         March        Current
                     Estimate       Estimate        Estimate

                    $4,379,600     $4,212,200     $3,106,700

     The net decrease of -$1,272,900  results from several   actions, as  follows:

     "  January - March.    (-$167,400)   This  change  represented   a decrease  of
     $167,400 from  the January  submission, of which $1,400  was for Salaries  and
     Expenses and $166,000 was for Abatement,  Control and Compliance.  The reduc-
     tion in  extramural  resources delayed the  completion  of  one  to  two  of 32
     projected Environmental   Impact Statements  necessary for the  designation of
     Corps of Engineers'  dredge disposal  sites.

     -  Reprograimring.  (-$12,400)  During the development of the operating plan,
     several mi scell aneous reprogrammings, which are  not  reportable to Congress,
     were made  to  this  activity  and  resulted  in  a net decrease  of  -$12,400.

     -  Congressional  Actions.  (-$1,094,900)  A reduction of -$826,200 was taken
     against the March estimate  reflecting  the  September  12% reduction  to  the
     Abatement, Control  and  Compliance appropriation.   Data collection and anal-
     ysis for determining the effects  of  ocean dumping at existing  sites  will be
     reduced, resulting in the  designation  of three rather than  five  dump-sites.
     Laboratory analysis  and  preparation  of  environmental  impact  statements
     (EIS) on dredge  spoil  sites  will  be drawn  out, resulting  in five  or  six
     final EISs and seven draft EISs produced in 1982.
                                      WQ-84

-------
        An additional reduction  of  -$268,700  was applied to the Salaries and Ex-
     penses  ($28,900) and Abatement, Control and Compliance ($239,800) appropria-
     tions to meet Congressional ly mandated appropriation levels.

     -  Transfer Authority.  (+$1,800)  The net increase applied to this activity
     includes a decrease  of -$25,000 from Abatement, Control  and  Compliance and
     an increase  of +$26,800  to Salaries  and Expenses  for  printing and  other
     contractual services,

1982 Program

     In 19S2, the Agency  is allocating a total  of $3,106,700  and  23.3 permanent
workyears to this program of which  $1,069,700  is  for the  Salaries  and Expenses
appropriation and $2,037,000 is for the Abatement, Control, and Compliance appro-
priation.  The majority majority of the extramural  resources are to survey sites,
develop Environmental Impact Statements (EISs) and designate sites.

     The Agency expects  to implement  parts of the ocean disposal program discussed
above as  well   as  continuing  other  program  activities  as  enumerated  below,

     >  Screen  81  Corps  of Engineers permits  for environmental  considerations
as required in Title I of MPRSA.

     -  Produce EISs designating  five dredged material  disposal sites  for Corps
of Engineers projects;

     -  Provide  technical  support   for  making offshore  permitting  decisions.

     -  Develop an  EIS  and designate an ocean  dumping site  for municipal  sewage
disposal.

     <*•  Issue two research and two special  permits for waste incineration at sea.

     -  Issue program guidance  and   appropriate controls and  procedures  for the
issuance of NPDES permits for offshore oil  and gas and other offshore industries.

     -  Respond to  the  recent decision of  United  States District Cogrt  for the
Southern District of New York in the case of City of New York versus  EPA by revising
ocean dumping  regulations  and  developing  a  municipal   waste  characterization
program.

     -  Work with NOAA  and EPA  research  laboratories  to  collect and analyze data
related to ocean  dumping,  especially for  use in designating suitable  sites, and
ocean industrial operations.

     -  Develop initial  guidance on bidassays for waste dumping,  disposal of radio-
active wastes,  certification of vessels for incineration of wastes, and the eval-
uation of balancing disposal alternatives.

     -  Prepare Annual  Marine  Protection,  Research  and  Sancturies Act  Report.

1983 Program Request

     The Agency requests  a  total  of $3,566^600 and 24.3  permanent workyears for
this program, of  which  $1,223,400 is for the  Salaries and Expenses appropriation
and $2,343,200  is for the Abatement,  Control  and Compliance appropriation.  This
is an increase  of  5153,700 and 5306,200, respectively, and 1.0 permanent workyear,
which will allow  the  Agency to implement the ocean disposal  program being deve-
loped in  1982.  The program discussed above  includes the  revision  of the  ocean
dumping regulations  and  criteria.   It will  provide  a  much more comprehensive
ocean dumping program designed  to include the  ocean  as a  waste disposal  alter-
native.  Activities in 1983 will focus on:
                                     UQ-85

-------
     -  Publishing final regulations on ocean dumping criteria revisions.

     -  Reviewing, processing, and issuing approximately 40 applications for ocean
disposal.

     -  Reviewing approximately 70 dredged material disposal  permits and evaluate
requests by the Corps of Engineers for waivers.

     -  Providing assistance  for  NPDES  permit  development  using  CWA,  Section 403
guidance on "unreasonable degradation."

     ..*  Developing a data base to evaluate the impact of oil  and  gas  drilling on
receiving waters.  The data base  will enable the  development  of general permits.

     -  Preparing 14 EISs for ocean disposal  of dredged material.

     -  Surveying two municipal sewage  disposal sites  and  develop EISS  for these
sites.

     -  Preparing final  guidance documents on bioassay procedures, vessel certifi-
cation, disposal  of  radioactive  wastes  and  evaluation   of  balancing  disposal
alternatives.

     -  Testing  four  wastes to determine their  suitability for  ocean  disposal.

     -  Monitoring past dumping grounds  to determine recovery rates and  degree of
environmental damage and using results to develop  mitigating measures.

     -  Analyzing monitoring data in Georges Bank and  Flower  Gardens  to evaluate
NPDES permit conditions already in effect and recommending revisions in conditions
as appropriate.

     -  Preparing an Annual  Report to Congress pursuant  to MPRSA and London Dumping
Convention.

ENVIRONMENTAL EMERGENCY RESPONSE  AND PREVENTION

1981 Accomp11 shmgnts

     In 1981, the Agency obligated $8,766,300  and 108.6 permanent workyears.   Of
this amount,  $4,533,700 was   for  the  Salaries   and Expenses appropriation  and
$4,232,600 for  Abatement,   Control  and  Compliance  appropriation.  The  Agency's
Technical Assistance Team (TAT) contract provided  53 contract  workyears  to assist
the Regional  office  staffs.  Twenty TAT  workyears were used  in  conducting  110
on-scene oil  response  actions, monitoring over 5,500  removals,  completing  over
2,000 spill prevention inspections, and  conducting 25 damage assessments. Contract
resources also  were  used  for prevention regulation development  and  State  and
local program development.

     In 1981,  33 TAT  workyears   supported   response activities   associated  with
hazardous substances spills and hazardous waste site incidents,   with the enact-
ment of CERCLA,  these  response activities  and associated  resources  were trans-
ferred to the Superfund program.

1982 Explanation pf Changes from .. Janu_ary_ Bjjdlet Estimate

                      January         March         Current
                     Estimate       Estimate       Estimate

                    $6,343,400     $6,222,100     $5,939,100

     The net  decrease  of  -$404,300  results  from  several   actions, as  follows:
                                      WQ-86

-------
                - Hargti.   (-$121,300)   This  change  represented  a  decrease  of
     $ 12T,3W from"the"January submission, of which $54,300  was for  Salaries and
     Expenses and $67,000 was for Abatement, Control and Compliance.  The decrease
     resulted in  a  reduced level  of  monitoring   of   cleanup actions taken  by
     responsible parties,  State, or local  agencies,  and  prevention  inspections
     performed following major spills.

     -  Reprograiming.   (+$103,100)   During  the  development  of the  operating
     plan, severalmiscellaneous  reprogrammings,  which  are  not reportable  to
     Congress, were  made to  this  activity and  resulted  in  a  net increase  of
     +5103,100.

     -  Congressional Actions.   (-$403,000)  A  reduction of -$525,000  was taken
     against the  March  estimate reflecting the September  12$ reduction  to  the
     Abatement, Control   and  Compliance appropriation.   It was  subsequently  re-
     stored ($525,000)  by Congress  in final  action on the  1982  Appropriation
     Bill.

        An additional reduction  of -$403,000  was applied to  the Salaries and Ex-
     penses appropriation to  meet  Congresstonally  mandated appropriation levels.

     -  Transfer Authority.  (+$16,900)  The net  increase applied to this activity
     is +$16,900 to  Salaries  and  Expenses  to  fund necessay  operating  expenses.

1982 Program

     In 1982, the Agency is  allocating a total   of  $5,939,100  and 89.0 permanent
workyears to Environmental  Emergency Response,  of which  $3,939,800  is  for  the
Salaries and Expenses appropriation, and 51,999,300  is for  extramural  purposes
under the  Abatement, Control,   and  Compliance  appropriation.   During  1982,  20
TAT workyears  are supplementing Agency resources  in directing 130 on-scene  oil
spill response actions,  monitoring approximately 5,170  oil  removals,  conducting
over 2,200 SPCC  inspections,  and  conducting  18 oil-related  damage  assessments.

1933 Request

     The Agency requests  a total of $5,623,900 and 82.3 permanent workyears  for
this program, of which $4,030,900 is for Salaries and Expenses appropriation,  and
51,593,000 is for the Abatement,  Control and Compliance appropriation.   This is an
increase of $91,100  and  a decrease of  $406,300,  respectively.   The 1983 resource
levels will enable  the  Agency  to  monitor an  additional 28  oil  spill  removals
while maintaining  a  viable  inspection  program  to  prevent  future  releases.

     The Environmental Emergency Response program  will  continue to maintain a 24
hour per day capability to receive and  respond  to  accidental  releases  of oil  and
other petroleum  products.   (Releases of hazardous  substances are covered under
Superfund.)  Twenty TAT workyears  will  support  agency personnel  in directing 130
oil spill  removal  actions; monitoring  approximately  5,200  removals;  conducting
over 1,400 SPCC  inspections;  and conducting 12  damage  assessments.   The  cleanup
monitoring program will  also  continue  to  provide incentives  for adequate  removal
by responsible parties  and  serve  as  a mechanism  for  drawing  State  and local
agencies into directing removal   themselves.

STANDARDS AND REGULATIONS

1981 Accompli shments

     In 1981, the Agency obligated $3,418,300 and  58.6  permanent workyears.   Of
this amount  $2,493,400   was   for the  Salaries   and Expenses  appropriation  and
$924,900 for the Abatement, Control and Compliance appropriation.  These contract
resources were used  to  review pollutants on  and amend  the  Section 307(a) list,
to prepare  criteria  documents, develop  site-specific water quality  criteria
modification procedures and  field  testing,  test toxicity procedures  for dredged
                                      WQ-87

-------
material, prepare a draft  water  quality standards regulation and  assist  Regions
and States in conducting use  attainability analyses  and in determining the  eco-
nomic attainability of  water  quality  standards.  The  program accomplished  the
following:

     Criteria and Standards

     -  Continued criteria development  work on  aquatic  toxicity  recommendations
for 14 toxic pollutants  and  on both human health and aquatic toxicity criteria
previously included in Quality Criteria  for Water; completed chronic  toxic  cri-
teria for 20 pollutants for which acute toxic  criteria  had  been  previously deve-
1 oped.

     -  Completed actions  on  7 petitions  affecting  12  pollutants on  the  307(a)
list and initiated action to  remove  one  pollutant from the  list.

     -  Developed draft site-specific criteria development methodology for  testing
and application by the States.  By enabling the States to set aquatic criteria for
stream uses based on  local conditions, artifically high  lab-derived  criteria can
be avoided, thus eliminating the need for excessively stringent treatment require-
ments.  Field-tested the  protocol  in four States,

     -  Prepared draft water quality standards regulation  and initiated develop-
ment of  policy  and guidance  to  assist  States  in Devaluating  existing   stream
uses (use  attainability)  to  give  greater  consideration  to  environmental   and
economic impact of the established uses.

     -  Developed agreements  in 38 States for water  quality standards  reviews  on
priority stream segments.

     -  Assisted 20 States in  conducting use attainability  studies.

     -  Reviewed 11 proposed AST/AWT projects for water  quality standards  consi-
derations.

     Clean LakesManagement   •

     -  Provided  technical  review  for  over  30   Clean  Lakes  project  completion
requests and  recommended  appropriate   award  actions   for  up  to  20  projects.

     -  Provided management assistance  to approximately  200 operating Clean Lakes
projects.

     -  Continued the transfer of Clean Lakes Program  responsibilities to State
and local agencies.

1982 ExplanatIon oftChanges^froro January Budget Es.t.1 mate

                      January        March        Current
                     Estimate       Estimate       Estimate

                    $4,943,800     $3,641,100     $3,167,400

     The net decrease of  -$1,776,400 results  from several  actions, as follows;

     ~  January - March.    (-$1,415,600)   This change represented a decrease  of
     $1,415,600 from the January  submission, of  which $809,400 was  for Salaries
     and Expenses and $606,200 was for Abatement, Control and Compliance  support
     to Clean Lakes  grant management.   The  reduction eliminated  the  management
     of the Clean Lakes grant  program,  in concert with  the elimination of grant
     dollars.
                                      WQ-88

-------
     -  Restructuring,   (+5112,900)   With  this  restructuring,  the majority  of
     these resources  associated  with Dredge  and  Fill  activities  are n&w  under
     the management of the Office of Federal Activities.  The remaining resources
     are being moved  to  Standards and Regulations.  These  resources will  provide
     for the development and implementation  of  technical  criteria,  for  review
     and comment on permit application from the Corps of Engineers, or the States.

     -  Reprogramming.   (-$78,800)  During the development of the operating  plan,
     several miscellaneous reprogramtnings, which are not  reportable to Congress,
     were made to  this  activity  and resulted in  a  net  decrease  of  -$78,800.

     -  Congressional Actioris.  (-$394,900)  A reduction  of -$118,700 was  taken
     against the Marchestimate  reflecting  the  September  123 reduction to  the
     Abatement, Control and Compliance appropriation.   Less contractual  technical
     assistance will  be  provided to Regions and States  for modifying  criteria at
     specific sites.

        An additional reduction of -$276,500  was  applied  to the  Salaries  and  Ex-
     penses (S244.300) and Abatement, Control  and  Compliance ($32,200)  appropria-
     tions to meet Congressionally mandated appropriation  levels.

     -  Transfer Authprity.   (+$300)  The  net  increase applied  to  this  activity
     is $300 to "Salaries and Expenses for essential  operating costs.

1982Program

     In 1982 the Agency is allocating a  total  of $3,167,400 and 60.6  permanent
workyears for this  program,  including $2,894,300  for  Salaries and Expenses  and
5273,100 for Abatement,  Control  and Compliance.   Major accomplishments  planned
for 1982 include the  promulgation of  a revised  water quality standards regulation,
the evaluation of the removal  of pollutants  from the 307{a) list,  field testing of
use attainability  guidance,  field  validation  and  assistance to the  States  in
applying site-specific criteria  procedures, and the transfer of Clean Lake  Program
responsibilities to State and  local agencies.  Specific program objectives  include
the following:

     Criteria and Standards

     -  Evaluate 5 pollutants identified  by the Agency as  candidates  for  removal
from the 307(a) toxic pollutant  list.

     f-  Develop 2  new protocols  (methods) to develop water  quality criteria  for
specific site  situations; Issue  additional  site-specific criteria  development
methodologies.

     -  Field  test site-specific  criteria  protocols  in 10  states  on 15  stream
segments and the guidance on use attainability analyses.

     -  Issue proposed water  quality  standards  regulation which revises 1975  regu-
lation.

     -  Develop guidance on  use attainability analyses,  cost/benefit  assessment
in achieving stream  uses,  general  water  quality  standards program implementation
policies, and use of water quality criteria in NPDES permits.

     -  Review approximately  20  AWT/AST projects  for water  quality  standards
issues.

     Clean Lakes Management

     -  Review and approve grant applications for  the completion  of  approximately
20 implementation lake restoration projects.
                                     WQ-89

-------
1983 Program Request

     In 1983, the Agency requests a total  of $3,179,100  and  55.9  permanent  work-
years.  This  includes  $2,839,900 for   Salaries  and  Expenses  appropriation  and
$339,200 for  extramural  purposes under the  Abatement,   Control  and  Compliance
appropriation.  This is  a  decrease of  $54,400 and  a decrease of 4.7 permanent
workyears in  Salaries  and  Expenses  and  an  Increase of  $66,100 in  Abatement,
Control and Compliance.  In  1983, the Agency  will  de-emphasize  criteria develop.
ment activities,  which are  nearing  completion.   The program  will  work toward
increasing State flexibility in  setting economically and environmentally attain-
able standards  and  toward  the application  of site-specific criteria  procedures
to set  criteria  at  levels  which  reflect  local   environmental  conditions.   No
funds for Clean Lakes  Management are requested.  Program  objectives  will  include
the following:

     Criteria and Standards

     -  Promulgate final  rule on water quality standards.

     -  Finalize guidance documents on  criteria modification,  use attainability,
and cost/benefit  assessment to  permit  the  use  of  water  quality  criteria  in
wasteload allocations,  and other general standards  program policies.

     -  Initiate  critical  examination  of the 307(a)  list  to identify  pollutants
misclassified as toxic  when the list  was established.

     -  Develop one additional  site-specific criteria protocol.

     -  Assist States  in resolving issues on  the adequacy  of criteria  on approx-
imately 60  stream segments;  in  conducting  use attainability  analyses; and  in
determining the cost/ benefit assessment of water quality standards.

     -  Test  new criteria  modification protocols   on 20  stream  segments,  with
the objective  of providing  States  with  a variety  of inexpensive,  streamlined
methodologies (e.g.  biological,  chemical  protocols)  for  setting  site-specific
criteria to  assure  attainable  uses.   This  testing is  necesssary  to  adapt  the
protocols to actual  field use.

     -  Analyze policy  and technical  causes related to application of criteria in
standards and update criteria recommendations.

     -  Evaluate  Regional  and  State  programs for  application  of new policies.

     -  Review  12 AST/AWT  projects  from  water quality   standards  perspective.

     -  Analyze program impacts and  develop regulatory and administrative options
to meet new requirements of CWA amendments.
                                      WQ-90

-------
                                             WATER QUALITY

                                  Water Quality Monitoring 4 Analysis

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 19B2
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Ambient Water Quality
Monitoring
 Salaries S Expenses
 Abatement Control ft
 Compliance

TOTAL:
 Salaries 4 Expenses
 Abatement Control &
 Compliance

Mater Quality          TOTAL
Monitoring I Analysis

PERMANENT FULL-TIME WORKYEARS
 $7,981.3   $9,443.7   $8,479.2   $7,894.3   $8,791.7    $897.4
 $2,382.5   $1,922.9     $879.9     $573.7     $375.7   -$198.0
 $7,981.3   $9,443.7   $8,479.2   $7,894.3   $8,791.7    $897.4
 $2,382.5   $1,922.9     $879.9     $573.7     $375.7   -$198.0
$10,363.8  $11,366.6   $9,359.1   $8,468.0   $9,167.4    $699.4
Ambient Water Quality
Moni tori ng
    191.2
190.6
160.6
150.3
140.6
-9.7
TOTAL PERMANENT WORKYEARS
    191.2
190.6
160.6
150.3
140.6
-9.7

-------
                                             WATER QUALITY

                                  Water Quality Monitoring 4 Analysis

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
TOTAL WORKYEARS
Ambient Water Quality                 233.1      240.8      210.8      198.6      181.0     -17.6
Monitoring

TOTAL WORKYEARS                       233.1      240.8      210.8      198.6      181.0     -17,6

-------
                                 WATER QUALITY

                     Water Quality Monitoring and Analysis

Budget Request

     The Agency  requests  $9,167,400  and 140.6 permanent  vrorkyears for  1983,  an
increase of $699,400 and  a decrease  of 9.7 permanent workyears  from  1982.   This
request includes  $8,791,700 for  the  Salaries   and  Expenses  appropriation  and
$375,700 for  extramural  purposes  under the  Abatement,   Control  and  Compliance
appropriation.

Program Description

     This subactivity develops water  quality  monitoring  strategies,  systems, and
procedures used to identify the biological  and chemical  measures  of environmental
quality.  These  measures   are  necessary for  assessing  local  water quality and
determining cost-effective  controls  required  to  meet local water  quality  objec-
tives.  These  are primarily State activities,  supported  by  EPA.  They  include
water quality  sampling  and  analysis  to identify  water  quality  problems,  their
causes and relative  severity,  and technical  studies  to  support the water quality
management program, including use attainability analyses.

     The program  also develops  procedures  for and assists States  in  using  these
water quality  data  in technical  analyses, including total  maximum daily  loads
(TMDLs) and wasteload  allocations (WlAs).   These  analyses support the  develop-
ment and implementation of specific  discharge effluent  limitations  and controls.
This approach  ensures  that  pollution  controls  necessary  to meet  local   water
quality objectives  are  applied  in permits  issued to  industrial  and municipal
dischargers.

     This program also manages  national  efforts  to perform environmental  benefit
assessments of  water  regulations and  standards  for  inclusion  in  Regulatory
Impact Analyses  (RIAs)  and for  fulfilling  related requirements  of Executive
Order 12291.  This  includes technical evaluations of the  environmental  exposure
and risks  associated with  the presence of  key  pollutants  in  surface  waters.

     Similarly, the program provides  national guidance and technical  assistance
for State efforts to analyze and report on their water quality  and  to  identify
priority problem  areas  and needed State action  to implement  required controls.
This State effort also  serves  as an  important water  quality and  program  planning
information source  for the State continuing  planning process as  required  under
Section 3Q3(e)  of  the  Clean  Water  Act.    EPA's  responsibility  under   Section
305{b) is to  consolidate  the information provided by the States  into  a  national
water quality report which discusses  water quality as well as program management
trends nationally.  The program  also  provides user technical  assistance  for APP
systems used  to  manage  State and EPA water quality  information  for  these  types
of analyses.

MATER QUALITY MONITORING AND ANALYSIS

1981 Accomplishments

     In 1981,  the Agency  obligated $10,363;800.   Of this amount $7,981,300 was
for the Salaries and Expenses appropriation and $2,382,500 was for the Abatement,
Control and Compliance appropriation.   Major accomplishments included the  develop-
ment of methodologies for  assessing environmental  benefits  of water quality pro-
gram regulations  and  continued efforts to  collect and  analyze  effluent  samples
and develop  environmental   exposure/risk  and  fate  data   to  help  identify  and
recommend which  toxic  pollutants require  further regulatory  controls or  which
should be  added  or  deleted from the  Section 307(a) list of toxic  substances.
Additional accomplishments  included:
                                      HQ-93

-------
     - tentative identification and ranking of 20 areas which may need additional
       protection from discharges of chemicals and metals;

     - recommendation of  control  strategies  for  selected  pollutants and  areas;

     - technical reviews  of  eight  project  proposals  for advanced waste  treatment
       construction grants projects;

     - assistance  to  the States  on  using TMDLs  and  WLAs  in  making  pollution
       control decisions; operation of a data  clearinghouse  for  water monitoring
       programs and  computer  systems  support  to  water   quality  data  users;

     - continued improvement  of  data  collection and analysis  methodologies;  and

     - guidance and  management of  quality assurance programs for water quality
       data collection and analysis.

1982 Explanation of Changes from January Budget Estimate

                      January         March        Current
                     Estimate       Estimate       Estimate

                   $11,366,600     $9,359,100     $8,468,000

     The net decrease of  -$2,898,600 results  from several actions,   as  follows:

     "  January - March.  (-$2,007,500)  This change  represented  a   decrease  of
     $2,007,500 from the  January  submission,  of which $964,500  was  for Salaries
     and Expenses  and $1,043,000  was  for  Abatement,  Control  and   Compliance.
     This decrease resulted  in reduced  oversight  of State  monitoring  programs.
     Also, there was  some reduction in  sampling  and analyses for toxic  organic
     pollutants which were  not as prevalent  in  surface water as  originally  be-
     lieved.  Finally, there  was  greater  reliance on  existing  data  and  reduced
     emphasis on  pollutants  which  posed   less  of   an environmental   problem.

     "  Reprojrjimming.   (-$78,300)   During  the  development  of  the  operating
     plan, several  miscellaneous  reprogrammings,  which are  not  reportable  to
     Congress, were made  to  this  activity and  resulted  in  a  net  decrease  of
     -$78,300.

     -  Congressi ona 1  Act ions.  (-$906,700)  A  reduction  of -$248,400  was  taken
     against the March  estimate  reflecting  the  September  12% reduction to  the
     Abatement, Control   and  Compliance  appropriation.   Technical  guidance  to
     Regions and States  for performing toxic pollutant  wasteload  allocations will
     be reduced.  Current staff  will  continue to document  storage and  retrieval
     system (STORE!)  modules  and update  and  distribute user assistance  material.

        An additional  reduction of  -$658,300  was  applied to the  Salaries and  Ex-
     penses ($612,500) and Abatement,  Control  and Compliance ($45,800) appropria-
     tions to meet Congressionally mandated appropriation levels.

     -  Transfer: Authority,   (+$93,900)   The net increase applied  to this activity
     is +S95v9UDto  Salaries  and  Expenses which  will  fund  necessary  operating
     costs,

1982 Program

     In 1982, the Agency  is  allocating  a total  of $8,468,000 and 150.3  permanent
workyears for this program,  of which $7,894,300 is for the Salaries  and Expenses
appropriation and-$573,700  is for the Abatement,  Control  and Compliance  appro-
priation.  A  major  focus  of  1982  is the  development and  implementation  of  a
water monitoring strategy.   The  strategy endeavors to  improve and upgrade  water
quality data collection,  analysis,  and  reporting  for the States to  define  uses-,
                                      WQ-94

-------
develop supporting criteria and standards; effectively plan  control  of pollutant
discharges; and measure  the  results of  cleanup  programs.   Under this  strategy,
EPA will rely upon the States to collect their own data and  identify their  water
body needs.  The  Agency  will  foster  cooperation among  local  agencies,  States,
the dischargers themselves, and the Regions  to  address these needs.   Other pro-
gram objectives include the following:

     -  Complete testing  of methodologies for  assessing  environmental  benefits
of water quality  program  regulations  for  inclusion in  RIAs;  provide  detailed
supporting data for  RIAs for major  proposed Effluent Standards  and  Guidelines
(the RIA efforts are  described under that program); prepare RIAs for other program
regulations, including the revised  water quality  standards  regulations;

     -  Develop Improved procedures  for collecting,  analyzing, and  interpreting
biological  data to assist both initial  screening  of  surface  waters  with impaired
uses and detailed investigations of these areas to support site-specific control
decisions;

     -  Complete  national  aquatic  life survey  to   provide  an overview of  the
biological  status of the Nation's  waters;

     -  Develop regulations  and guidance  for TMDLs  and  WLAs, and continue  to
provide technical  assistance to the States  as requested;

     -  Continue to  review water  quality justifications  for advanced  wastewater
treatment construction grants projects;

     -  Upgrade the  usefulness  of  State Section  305(b) water quality  reports  so
that they may be used to evaluate  problems  and set State  pollution control  prior-
ities; work  with  each  State  to  develop  appropriate methodologies  to  support
this effort;

     -  Phase out detailed oversight of State water  quality  monitoring programs,
relying instead on  the  water  monitoring  strategy  as a  tool  to  work  with  the
States in providing technical  guidance  and  assistance in  improving State capabil-
ities to conduct water monitoring  programs;

     -  Develop and  begin  to  implement  a program to upgrade the  quality of data
by segregating data of known and  unknown quality in  EPA's  water quality informa-
tion system; continue to manage information  systems  for  users, and provide tech-
nical assistance on system capabilities  as  required;

     -  Develop initial  Regional  quality assurance  program  plans, and  assist a
limited number of States in implementing these plans.

1983 Program Request

     In 1983, The Agency requests  a total of $9,167,400 and 140.6  permanent work-
years for this  program,  of  which $8,791,700 is for the  Salaries  and  Expenses
appropriation and $375,700 is  for the Abatement, Control and Compliance appropria-
tion.  This is  a  increase  of $897,400  and a  decrease  of $198,000,  respectively,
and 9.7 permanent workyears.  Major accomplishments  planned  for 1983 include the
development of  environmental benefits  assessments for RIAs  of major regulations
and implementation of  the  Regional and State elements of the water  monitoring
strategy.  Program objectives will  include  the following:

     -  Provide detailed  technical data to support development of RIAs for proposed
Effluent Standards and Guidelines,  and  prepare environmental  benefits assessments
for RIAs for existing Effluent Standards and Guidelines;

     -  Continue implementation of  the  water monitoring strategy,  with emphasis
on more detailed State assessments of known or suspected use impairments attribut-
able to water pollution,  including increased use of biological data; and on report-
                                      HQ-95

-------
ing water quality  and program  management  trends using  Section  305(b)  reports;
reduce emphasis on fixed monitoring stations;

     -  Implement strategies for targeting  limited local, State, and EPA resources
toward the most severe water quality problems (including identifying and tracking
control progress in water quality problem areas);

     -  Review  water  quality  justifications for  advanced  wastewater  treatment
construction grants, and provide technical  assistance  to the States on preparing
TNDLs and WLAs;

     -  Continue to segregate inadequate data from information systems and update
the system so that it may better assist Agency efforts  to develop RIAs;  implement
the water  monitoring   strategy and  support  State  water  quality-based  control
efforts;

     i-  Provide field and  analytical  support to the States  for  developing site-
specific water quality standards;

     -  Complete the  review  and approval  process for Regional and  State quality
assurance program plans.
                                      WQ-96

-------
                                             MATER QUALITY

                                        Municipal Source Control

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983     DECREASE -
                                                 1982       1982       1982  .          1903 VS 1982
PROGRAM
                                              (DOLLARS  IN THOUSANDS)
Municipal Waste
Treatment Facility
Construction
 Salaries 8 Expenses
 Abatement Control A
 Compliance

Corps Of Engineers
 Abatement Control S
 Compliance

Waste Treatment
Operations &
Maintenance
 Salaries it Expenses
 Abatement Control 8
 Compliance

Manpower Planning 4
Training
 Salaries ft Expenses
 Abatement Control S
 Compl lance
$24,350.1  $26,416.9  $22,405.8  $22,146.2  $14,291.2 -$7,855.0
 $4,055.8   $4,179.1   $4,279.1   $2,772.5   $1,904.4   -$868.1
$20,810.3  $22,518,0  $21,518.0  $16,232.5  $17,387.4  $1,154.9
 $1,101.4   $1,528.0   $1,540.3   $1,497.0   $1,693.9
   $129.6      $80.0      $80.0      $25.0
            $1,477.8
            $2,625.2
$196.9
-$25.0

-------
                                             WATER QUALITY

                                        Municipal Source Control

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
NEPA Compliance
Municipal Waste
Facility Construction
 Salaries & Expenses
 Abatement Control $
 Compliance

TOTAL:
 Salaries 5 Expenses
 Abatement Control 3
 Compliance

Municipal Source
Control
TOTAL
                                             (DOLLARS IN THOUSANDS)
            $2,857.6   $2,679.8   $2,679.8   $3,018.1   $2,282.1   -$736.0
            $4,725.5   $6,600.0   $6,600.0   $4,747.8   $6,210.6  $1,462.8
$28,309.1  $32,102.5  $26,625.9  $26,661.3  $18,267.2 -$8,394.1
$29,721.2  $36,002.3  $32,477.1  $23,777.8  $25,502.4  $1,724.6


$58,030.3  $68,104.8  $59,103.0  $50,439.1  $43,7€9.6 -$6,669.5
PERMANENT FULL-TIME WORKYEARS
Municipal Waste
Treatment Facility
Construction

Waste Treatment
Operations 8
Maintenance

Manpower Planning &
Training
               718.3      719.4      595.4      566.1      331.7    -234.4
                28.7       35.1       35.1       35.6       37.4       1.8
                           25.5

-------
                                             WATER QUALITY

                                        Municipal Source Control

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
NEPA Compliance
Municipal Waste
Facility Construction

TOTAL PERMANENT WORKYEARS

TOTAL HORKYEARS
Municipal Waste
Treatment Facility
Construction

Waste Treatment
Operations &
Maintenance

Manpower Planning &
Training

NEPA Compliance
Municipal Waste
Facility Construction

TOTAL WORKYEARS
 88.1       94.0       94.0       90,6       67.0     -23.6
832.1      874.0      724.5      692.3      436.1    -256.2
833.3      848.4      718.4      673.4      400.1    -273.3
 29.4       36.7       36.7       37.1       39.0       1.9
            39.5
 90.2       95.0       95.0       91.6       67.0     -24.6
952.9    1,019.6      850.1      802.1      506.1    -296.0

-------
                                  WATER QUALITY

                             Municipal  Source Control

Budget Request

     The Agency requests  a total  of $43,769,600 and  436.1  permanent  workyears
for this  program   of  which  $18,267,200   is   under  the  Salaries  and  Expenses
Appropriation and   $25,502,400 is  under the  Abatement,   Control  and  Compliance
Appropriation.  This restructered  subactivity reflects  the  transfer of  several
activities to State  Programs  Management,  including  oversight of  the interagency
agreement with the United  States Army  Corps  of Engineers, delegation management,
and the wastewater treatment training program.

Program Description

     This area provides  resources  for management of  most  of the  Construction
Grants Program,  including those activities  primarily related to project management
which have  not  been  delegated  to  States under Section 205{g),   Construction
grants are  awarded  to municipalities  for  construction  of cost  effective  waste
water treatment  facilities  needed  to meet  water  quality  and  public  health
requirements.

     Since 1977,  EPA has  been delegating most  construction grant  project manage-
ment activities  to the States under Section  205(g)  of the Clean  Water  Act.   EPA
has negotiated agreements to provide for phased transfers  of authority and respon-
sibility, except for  those activities  restricted to  EPA by  statute or  current
regulation.  A total of  46 States  are expected to have  signed  delegation agree-
ments by the  end  of 1983,  with  25 of the States  fully  delegated at that  time.

     EPA will continue to exercise  some  project management responsibilities in the
remaining nondelegated and  partially delegated  States  and Territories.  EPA  is
working with  all  States  to increase  the  rate  and  level of  delegation and  to
ensure effective overall  results-oriented program management.  With the continuing
assistance of the  U.S.  Army Corps of Engineers in priority construction management
activities, EPA is  restructuring  its historical  role and  resources  from project
management to overall  program management, State training,  and State  management
assistance.

     For budgetary purposes,  Construction  Grants Program Management is  divided
into the following four principal  program  elements:

     Municipal Waste Treatment Facility Construction --   This   program   includes
most of  the  day  to  day  in-house  management  activities  associated  with  the
Construction Grants Program in Headquarters and Regional  Offices.

     Corpsof Engineers — This  program covers a range of construction management
related activities assigned to the Corps of Engineers  under interagency agreement
to assure  the technical  and  fiscal  integrity of  wastewater treatment  projects
construction.

     Operationsand Maintenance --  This  part of the  program  involves the  con-
tinuous assessment of  the performance  of  publicly owned  treatment works  (POTWs)
in accordance with  Section 210  of the Clean  Water  Act.   It  also  provides for
the support  of  State,  local,  and  private  'sector  efforts  to  ensure  meeting
established effluent standards through improved operations and management.

     NEPA Compliance — The purpose of these activities  is to  assure  that  muni-
cipal wastewater treatment facilities  are  planned and  constructed in conformance
with the National  Environmental  Policy Act  (NEPA).
                                      WQ-100

-------
MUNICIPAL WASTE TREATMENT FACILITIE£CgNSTlUCTIOI|

1981 Accompli shments

     Obligations for management of the Construction Grants Program in 1981  totaled
528,405,900 and 718.3 permanent workyears,  of  which $24,350,100 was for Salaries
and Expenses  and  $4,055,800   for  extramural   activities  under the  Abatement,
Control and Compliance Appropriation.

     EPA awarded  construction grants totaling  $3,941,567,000,  with  a total  of
11,934 active projects at  year end.  Approximately 8,000 projects  have received
grants for  project construction (Step 3  and Step  2+3).   Of this  number,  3,795
projects representing 45X  of  those started were physically complete  and  on line
by the end  of 1931;  a  total  of  602 projects  completed  construction during the
year.

     EPA initiated a number of legislative, regulatory, and administrative reforms
in 1981.  Working  with  the States,  EPA  developed  and submitted  to the Congress
significant reforms in the Construction  Grants Program designed to  substantially
reduce the  need  for Federal  funds, and  to provide  a more cost effective focus to
the program emphasizing  identified  water quality/public health  needs.   EPA also
developed and proposed revisions  to  program  regulations  and guidance  designed to
simplify and  streamline  program  requirements  and  provide  increased  flexibility
to States.

     In 1981, the  Agency initiated  a program  to eliminate backlogs  of projects
awaiting completion,  audit resolution,   and closeout.   Resources  were directed
to assure that audit issues were resolved  on projects  within  six months of audit
completion, consistent with Congressional  directives.   In a related area, policies
and procedures were  established  for managing projects to prevent and respond to
problems of waste, fraud, and abuse.

     EPA developed guidance and began working with appropriate States  to reorient
project priority  systems  and  priority  lists to  assure  funding of  projects to
meet essential water  quality  and  public  health  needs.   Efforts were also devoted
to assuring that construction  results in municipal wastewater treatment facilities
that are  affordable and  that continue  to meet design  and permit requirements
through effective  operations  and maintenance.  The  Agency's  Municipal Management
System was  used  to  coordinate  water quality  permits  and  construction  grants
requirements.

     The Agency  encouraged the application  of  innovative and  alternative (ISA)
technologies.  Through 1981,  approximately 800  ISA grants  were awarded,  largely
oriented to  land  application  of  sludge  and  land  treatment  of  waste  water.
Approximately 90 facilities currently are operational.

     Intermedia guidance  was  developed  and  a  number  of States  and  communities
were provided  assistance  on  cost-effective sludge  management  approaches.   The
Agency signed an  agreement with the U.S.  Department of  Agriculture and the Food
and Drug Administration  supporting the use of  sludge on land which  will signifi-
cantly reduce sludge handling costs.

     The secondary treatment marine discharge waiver program under  Section 301 (h)
of the  Act  issued  13 tentative decisions >,on  discharge waiver  applications; 11
requests for waiver  were approved based  on documented  needs.   These waivers will
result in construction savings of approximately $800 million.

     EPA maintained  a detailed  review  process  related to  funding  of advanced
treatment projects.   These reviews,  required  by Congress,  assure  that projects
with incremental  costs   over  $3 million  provide significant  water  quality and
public health  benefits.   The  Regions reviewed  a total of  207 proposed advanced
treatment projects and referred 20 with  incremental  costs over $3 million to the
Administrator for review and approval.  EPA's review of these projects  is expected
to result in capital cost  savings of over $760 million.
                                      WQ-101

-------
1982 Explanation of Changesfrom JanuaryBudget Estimate

                      January         March        Current
                     Estimate       Estimatg       Estimate

                   $30,596,000    $26,584,900    $24,918,700

     The net decrease  of  -$5,677,.300 results  from several actions, as  follows:

     *  January - March.   (-$3,911,100)   This  change represented  a decrease  of
     $3,911,100 from  the   January budget,  of  which a $4,011,100  decrease  in
     Salaries and Expenses was offset by a $100,000 increase in Abatement, Control
     and Compliance.   The  decreases  reflect  the  reduced  appropriation  which
     results in  fewer  awards to be  processed.    Additionally,  staff  decreases
     reduced the scope  of efforts to  implement new  program  thrusts related  to
     municipal  self sufficiency,  integrated  waste management. Federal  oversight
     of delegated programs and expanded  use of innovative/alternative technology.

     "  Reprogramming.    (+$255,400)   During  the  development  of  the  operating
     pi an,	several   miscellaneous reprogramnrings.,  which are  not  repqrtable  to
     Congress,  were made  to this  activity  and  resulted  in  a  net increase  of
     +$255,400.

     -  Congressional  Actions.   (-$2,070,000)   A  reduction of  -$1,232,300  was
     taken against the March  estimate reflecting  the September 12%  reduction  to
     the Abatement,  Control  and Compliance  appropriation.  This  reduction  in
     funding will eliminate the  reach file work  for  water  quality  based priprity
     system and reduce quality reviews of facility plans.   Also we  will  eliminate
     technical  assistance  to grantees in the areas of grant processing,  contract
     administration, contract resolution.

        A Congressional add-on to this  activity  of +$350,000 was applied  to  the
     Salaries and Expenses  appropriation  for AWT Review reflecting  final  action
     on our 1982 Appropriation Bill.

        An additional   reduction  pf  -$1,187,700 was  applied to the  Salaries  and
     Expenses ($913,400) and Abatement,  Control  and  Compliance  ($274,300) appro-
     priations  to meet Congressionally mandated appropriation  levels.

     •  Transfer Authority.  (+$48,400)   The net  increase applied to Salaries  and
     Expenses (+$48,400) wi 11  fund necessary operating expenses.

1982 Program

     In 1982 the Agency is  allocating a total  of $24,918,700  and 566.1  permanent
workyears to this  program  of  which $22,146,200 is for Salaries and  Expenses  and
$2,772,500 is for extramural purposes under the Abatement,  Control  and Compliance
Appropriation.

     The Agency  has  requested a  supplemental  appropriation for funding  of  the
Construction Grants Program in   1982  at a level  of $2.4  billion.  EPA  expects
obligations from the  anticipated appropriation  and  monies from prior years  to
fund approximately 693 grants totaling $3.4 billion.  Approximately  1,186 projects
are expected to  be  completed  and brought into operation,  nearly double the 1981
level.                                       !

     EPA will  begin  implementing  the  1981  amendments.   The  effects  of  the
amendments are   described   more   fully   under  the  Construction  Grants  request.
Streamlined construction  grants  program  regulations will   be promulgated  which
will stress maximum  flexibility in  carrying out  the  program at  the  State  and
local level.
                                     HQ-102

-------
     During 198Z,  the  Agency   is  continuing  a  major  effort  to  reorient  the
management of the  program  away from  Federal  project  decision making  and  toward
oversight of  delegated  State  program activities.  The  States  are being  given
maximum flexibility in  carrying out  delegation activities.  EPA  is  working with
States to  identify program priorities and  assure that results  are achieved  in
key program areas.

     Priorities for 1982 include  improving  municipal  waste treatment  facilities
performance; ensuring projects affordability  (including  use  of innovative  and
alternative technologies);  significantly improving the rate of project completion,
audit resolution,  and project  closeout;  eliminating  the  potential  for  waste,
fraud, and abuse;  accelerating  the rate  and levels of State  program delegation;
and meeting annual obligation and outlay  projections.

     Working with  the Corps of Engineers,  the Agency will  increase efforts  to
eliminate backlogs of projects  awaiting completion, audit  resolution,  and  close-
out.  Consistent with Congressional directives, program staff  will  resolve audit
issues within six  months of audit  completion.   The  Corps  of Engineers  will  also
assist EPA in the  prevention  of waste, fraud,  and  abuse  in the  program through
on-site presence  at  large   facilities and  construction  management  evaluations,
and to respond effectively  to  allegations or evidence of  problems  identified  to
the Agency*

     EPA will provide appropriate assistance  to  States   in  targeting funds  to
meet highest priority water quality and public health needs,  in  developing water
quality and  public health  based  priority  systems  and lists,  identifying  high
cost or other problem projects, considering point source/nonpoint source control
tradeoffs, using  innovative and  alternative  technologies, dealing with  infil-
tration and  inflow issues,  and evaluating  before-and-after monitoring of water
quality impacts of construction.  The  Needs Survey will  be  modified to Incorporate
legislative reforms and  to  reorient  funding  more  directly to  a  water quality
needs.

     The Agency  will  complete  determinations  on the 17  pending Section  301 (h)
marine discharge  waiver  requests  from  affected  major  cities.   In  addition,
procedures will   be established for  completing determinations  on  the  remaining
small  cities which requested waivers prior to  enactment  of the  1981  amendments
and for reviewing  additional requests for waivers provided for in the new  legis-
lation.  By the  end  of 1982,  EPA will have established  procedures  for ensuring
permit compliance by coastal cities.

     EPA Headquarters will  continue  to  review  requests  for funding  of advanced
treatment projects with  incremental  costs  exceeding  $3 million.   Regional offices
are expected  to  review 115 advanced treatment  projects   and  to refer proposed
projects requiring the Administrator's review  for decision.  Criteria  issued  in
1982 will  require proposed advanced  treatment  projects to  meet more  stringent
water quality needs based  criteria  for funding  eligibility.

     The documentation and  analysis of the results of 28  Nationwide Urban  Runoff
Program projects will  be completed and an Interim report submitted to the Congress
on the results of  this  major three-year  effort.  The Agency  expects to identify
the extent and  nature of urban runoff problems  in  the  country  and  to  recommend
any appropriate actions  to  the Congress.

1983 Program Request

     In 1983, the  Agency requests  $16,195,600  and 331.7 permanent  workyears  for
this activity, including 514,291,200  under the Salaries and Expenses  appropriation
and $1*904,400 under  the Abatement,  Control and  Compliance Appropriation.  This
represents a  reduction  of  234.4  permanent   workyears  and $8,723,100,  including
$868,100 in Abatement,  Control  and  Compliance funds.   These changes  reflect  the
restructuring of  several budgetary  program  elements,  but  also reflect  increased
State delegation,  streamlined  Federal  oversight,  and  a reduction in  support  for
technological assistance.
                                      WQ-103

-------
     With a  proposed  1983 construction  grants appropriation  of  $2,400,000,000,
EPA expects to award approximately 661 grants.  Including prior year completions,
65% of  all   construction  project awards  since  1973  will  have been  completed.

     Although EPA  does  :not  expect  any  additional  States  will  accept  initial
delegation of  program  responsibility in  1983,  25  delegated  States  will  have
assumed full delegation  of program management responsibility,  an increase  of 11
over 1982.   EPA  will  continue to  maintain project management  responsibility in
the States  and territories  not delegated and  for  nondelegated  activities  in
other States.  The States  will have  2,300  personnel  committed to  program manage-
ment in 1983.

     As manager of a  largely delegated program in 1983,  EPA  will primarily ful-
fill the  role  of  overall  program manager by working  with delegated States to
define annual  national   program  priorities  and   objectives,  monitor  delegated
State programs, and  provide needed  management assistance.   The  Federal  program
will emphasize results  oriented  oversight  of a  limited number of  high  priority
program activities where there  are  direct financial,  water quality, or  public
health concerns.

     EPA will work to ensure that  funded  projects meet  identified  water quality
and public health  needs; that  projects are affordable to the populations served;
that completed facilities  are  operated and maintained effectively to meet design
and effluent permit requirements; that facilities  are  completed,  closed  out, and
brought on line as quickly as possible;  and that waste, fraud, and  abuse in the
program is prevented and eliminated.

     Annual guidance documents will  be updated to reflect  continuing  regulatory
reform and  legislative   changes.   EPA will  work  with  the  States to  complete
necessary modifications  to State  priority systems  and project priority  lists.
This activity  will incorporate additional  water  quality and  public  health  based
project funding criteria.

     EPA expects to eliminate  all  remaining  project  completion and audit  reso-
lution backlogs.    All  1,250 project  completions  will be  referred  to audit and
all audit  issues  resolved within  six months of  project  and  audit  completion;
major efforts  will also continue with the assistance of the  Corps  of Engineers
to reduce delays in final project closeouts.

     During 1983,  EPA and the  Corps  of Engineers  will  continue intensive efforts
to prevent waste,  fraud,  and abuse in the  program and  to  respond  effectively to
allegations or  evidence  of  problems.   The   Corps  of  Engineers  will   conduct
preconstruction reviews, maintain on-site presence  at all large, complex projects,
and conduct interim and final inspections.   EPA will also conduct over 125 on-site
evaluations of projects under construction  to  minimize construction and operations
problems.  Program staff  will  take  appropriate  actions in cooperation  with the
Inspector General  in response to problems of waste, fraud, and abuse.

     Technical implementation  criteria  and guidance  will  be  issued based  on  a
broadened definition,  issued in  1982, of eligible secondary treatment processes.
State assistance also will be provided to help implement cost-effective,  publicly
acceptable programs for  sludge management  and disposal.   Efforts  with  respect to
implementation of  innovative and  alternative treatment  technologies  will  con-
centrate on  disseminating  information on   model   approaches,  identifying  proven
technologies no longer  eligible  for  incentive funding,  and assisting  nationally
significant small  waste flows treatment projects.

     The Section 301(h)  marine discharge  waiver  program will  focus in  1983 on
technical monitoring  support  and review  of requests from  small cities submitted
before the  1981  amendments.   The  Agency  will continue  to receive  and  consider
requests submitted under  the amended legislation.  By  the end of  1983,  program
emphasis for large cities will shift  to permit compliance assurance.
                                      WQ-104

-------
     Based on the  1981  amendments,  the Needs Survey will  be  accelerated  to meet
the mandated December  31, 1982, completion date and  will  be revised  to  reflect
the new water quality and public health oriented eligibilities.

CORPS OF ENGINEERS

1981 Accomplishments

     The interagency agreement  with  the  U.S.  Army Corps of Engineers  was funded
at a level of $20,810,300 in Abatement, Control  and Compliance to support  various
wastewater treatment  facilities construction management  activities.   The  Corps
provided approximately  640  workyears  of support to  EPA  and State  construction
grants program management in 1981.

     The Corps performed  biddability and  constructability  reviews to  assure that
designs were technically  adequate prior to construction contract  awards;  managed
65% of  active  projects  under  construction;  and   performed  interim  and  final
inspections on  3,900 projects.   Continuing  on-site  presence  was maintained  at
all large, complex projects  to minimize  potential  for  waste, fraud,  and abuse.

1982 Explanation of Changes from January Budget Estimate

                      January        March         Current
                      Estimate      Estimate      Estimate

                   $22,518,000   $21,518,000   $16,232,500

     The net decrease  of -$6,285,500  results  from several actions, as  follows:

     "  january - jjarch.  (-$1,000,000)   This change represented a decrease  of
     $1 ,OM,000Trbra the  January  budget,  all  of which was in Abatement,  Control
     and Compliance.   There  was  a  minimal   reduction  in  Step  3  inspections.

     -  Congressional Actions.   (*$5,285,500)   A  reduction  of  -$3,642,400  was
     taken against the  March estimate  reflecting  the September 12% reduction  to
     the Abatement,  Control   and  Compliance  appropriation.   An  additional  re-
     duction of -$1,643,100 was applied  to the Abatement,  Control  and  Compliance
     appropriaton to  meet Congressionally  mandated  appropriation levels.   The
     impact should be minimal since the Corps has unexpended  1981  funds available
     in 1982.

1982 Program

     In 1982, the  Agency is  allocating $16,232,500 under the Abatement,  Control
and Compliance appropriation for the interagency agreement with the the Corps  of
Engineers.

     Under the  agreement, with  unexpended  obligations  from prior  years,  the
Corps will provide  an  estimated 582 workyears projected  to  be funded  under the
agreement.  The  total   program level  in 1982  will  be  $22,700,000  including
$6,467,500 in carryover from the 1981 program.

     The Corps will continue to perform biddability and  constructability reviews,
manage 40%  of  active  projects  under  construction,  perform interim  and  final
inspections at  3,900 projects, and  maintain on-site presence  at large  complex
projects. Supporting  high priority  efforts  to eliminate backlogs,  the  Corps
will play a  key role  in accelerating  project completions and project  closeouts
through conducting administrative reviews  prior to  audit and closing put completed
projects.
                                     UQ-105

-------
1983 Program Request

     The Agency requests a total  of $17,387,400  under  the Abatement,  Control  and
Compliance appropriation, an increase  of $1,154,900 from the 1982  current  esti-
mate.  This increase is necessary because of the absence of  unexpended  carryover
funds which were available in  1982,  but which are  not  available  in 1983,   Total
expenditures for the Corps will actually decrease  by $5,300,000  from $22,700,000
in 1982 to $17,400,000 in 1983.

     These extramural funds will be used to  support priority  wastewater  treatment
facility construction  management  activities  by  Corps of  Engineers personnel.
The Corps  of  Engineers  will  provide an estimated 440 workyears.   Corps  staff
will conduct biddability and  constructability reviews  prior to award of  construc-
tion contracts, conduct  interim and final  construction inspections  for  approx-
imately 2,700 projects, manage  35S of active projects under construction, maintain
on-site presence at large complex projects, and play a major role in administra-
tively completing and closing out  backlog projects.

OPERATIONS AND MAINTENANCE
1981 Accomplishments

     In 1981, the  Agency  obligated  a  total  of  $1,231,000  for  this  activity,
including $1,101,400  for  Salaries  and Expenses  and  $129,600  for  extramural
purposes under the  Abatement,  Control   and  Compliance appropriation.  With  this
extramural support,  the Agency  launched an  effort to improve  facilities  perfor-
mance through improved management techniques.

     Training materials  on financial  management   were  developed  as  well  as  a
computer model to identify problems  potentially leading to  difficulties  in plant
performance.  Joint efforts continued with the States and between EPA construction
grants and  compliance personnel  to  improve  the  performance  of publicly  owned
treatment works (PQTVIs) performance.   Nearly 300 completed  facilities  were eval-
uated and assistance  provided.   In addition,  an annual  survey of  the  efficiency
of PQTW operation and maintenance was  completed  under  Section 210  of the Clean
Water Act.

1982 Explanation of Changes from January Budget  Estimate

                      January         March         Current
                     Estimate       Estimate       Estimate

                    $1,608,000     $1,620,300      $1,522,000

     The net  decrease of  -$86,000  results from  several  actions,  as  follows:

     -  January - March.    (+$12,300)   This change  represented  an  increase  of
     $12,300 from the January budget, all of which was for Salaries and Expenses.

     -  Reprogramming.  (+$65,300}  During the development of the operating plan,
     several miscellaneous reprogranmrings, which are  not  reportable  to Congress,
     were made to  this activity  and  resulted  in  a net increase of  +565,300.

     -  Congressional Actions.  (-$165,300)  An  additional reduction of -$165,300
     was applied to the  Salaries and Expenses  ($110,300) and  Abatement,  Control
     and Compliance  ($55,000)   appropriations to  meet  Congressionally  mandated
     appropriation levels.

     -  Transfer Authority.  (+$1,700)   The  net  increase  applied to  Salaries and
     Expenses of +$1,700 will fund necessary operating expenses.
                                       yq-106

-------
1982 Program

    In 1982, the  Agency is allocating a  total  of $1,522,000 and  35.6  permanent
workyears to this activity  of which $1,497,000  is for Salaries and  Expenses  and
$25,000 is  under the  Abatement,  Control  and  Compliance appropriation.   During
1982, a  major  program  priority  is  incorporating  operations  and  management
considerations into plannning, design,  and construction activities.  The  Agency
will work to  improve  the  performance  of  major  treatment  facilities which  have
been constructed  with  the  support  of  Federal  funds.  This  will  be a  concerted
effort by  both  grant  and  enforcement program  staffs  to   provide  for  optimum
performance of such facilities and  to  assure a sound  return  on invested dollars.

     The Agency  will  issue  guidance on financial management practices  to  ensure
that municipalities are  capable of self-sustaining operations and  maintenance.
An effort funded in 1981 to track the relationship between  operations and manage-
ment decisions and water quality will  be assessed for use  in transferring  effec-
tive operations and management practices.

1983 Program Request

     The Agency requests a  total  of $1,693,900  and 37.4 permanent workyears  for
this activity  under the Salaries  and  Expenses  appropriation.   The increase  of
ST95.900 in the Salaries and  Expenses  appropriation reflects increased  personnel
costs.  The decrease of  $25,000  in the Abatement, Control  and  Compliance  appro-
priation represents completion  of  an  extramural effort to  identify  facilities
needing assistance.

     In 1983, the Agency will continue to place major emphasis on improving  the
performance of facilities  constructed  with Federal  funds  in a concerted  effort
by grants and  permit/enforcement staffs.   While attention  will  continue to  be
applied to major  facilities,  the focus  will  shift to enhancing  the performance
of smaller  facilities.   Significant gains  in the performance of  all  facilities
constructed with Federal funds are  anticipated.   States with  delegated programs
will provide major support for these efforts.

NEPA COMPLIANCE

1981 Accomplishments

     In 1981,  the Agency   obligated  $7,583,100  for  this  activity,   of  which
$2,857,600 was for Salaries and  Expenses  and  $4,725,500  was  under the  Abatement,
Control and Compliance  Appropriation.   In addition to ongoing  work  in  reviewing
environmental  information  documents,  preparing   environmental  assessments,  and
issuing findings of no  significant  impact, the  Agency initiated 49 environmental
impact statements (EIS) and related studies.

1982 Explanation of Changes from January Budget  Estimate

                      January         March        Current
                     Estimate       Estimate       Estimate

                    $9,279,800     $9,279,800      $7,765,900

     The net decrease  of -$1,513,900  results'from several  actions, as follows:

     -  Reprogramming.   (+$374,400)   During  the  development   of the  operating
     plan, several miscellaneous  reprogrammings,  which are  not reportable  to
     Congress, were made to  this  activity and  resulted  in a  net increase  of
     +S374.400.

     -  Congressional  Actions.   (-$1,904,400)   A  reduction  of -$1,852,200  was
     taken against the March  estimate  reflecting the .September 12%  reduction  to
     the Abatement, Control   and Compliance appropriation.   This  reduction  will
     result In approximately  nine fewer environmental impact  statements.
                                      WQ-107

-------
        An additional  reduction  of  -$52,200  was  applied  to the  Salaries  and
     Expenses appropriation to  meet  Congressionally  mandated appropriation  le-
     vel s.

     -  TransferAuthority.  (+$16,100)  The net increase applied to Salaries  and
     Expenses of+116,100 wi 11  fund necessary operating expenses.

1982 Program

     In 1982, the  Agency is allocating  $7,765,900  and 90.6  permanent  workyears
for this activity,  of which $3,018,100  is for Salaries  and Expenses and $4,747,800
is under  the Abatement,  Control  and   Compliance  appropriation.   The  contract
resources will  be  used  to  fund preparation  of EISs  and  related studies.  The
Agency expects to initiate 37  new studies in 1982.

1983 Program Request

     The Agency requests a  total of  $8,492,700 and 67.0  permanent  workyears  for
this program, of  which $2,282,100 is  for Salaries and  Expenses and  $6,210,600
for contractual  support under the Abatement, Control and Compliance appropriation.
This represents a decrease of $736,000  in Salaries an?l  Expenses and 23,6 permanent
workyears and an increase of $1,462,800 in extramural  funding.   The  decrease is
associated with reduced personnel costs as more  grantees  will  be responsible  for
EIS management in 1983.

      It is expected that 46 EISs and  related  studies  will  be initiated in 1983,
an increase of 9  over  1982.   EPA will   focus  on  assuring effective environmental
assessments are  keyed  to  specific  issues; preparing  creditable and  defensible
findings of no  significant  impact;  and encouraging grantees  to  disclose results
to the public in a more effective manner.
                                      WQ-108

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                             MATER QUALITY

                                        Water Quality Enforcement
                                     ACTUAL    JANUARY
                                     1981     ESTIMATE
                                                1982
                                    MARCH
                                  ESTIMATE
                                    1982
                                   CURRENT   ESTIMATE INCREASE +
                                  ESTIMATE    1983    DECREASE -
                                    1982            1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Water Quality
Enforcement
 Salaries 8 Expenses
 Abatement Control 8
 Compl1ance

Water Quality
Enforcement-Office of
Legal 8 Enforcement
Counsel
 Abatement Control &
 Compliance

TOTAL:
 Salaries 8 Expenses
 Abatement Control 8
 Compliance

Water Quality
Enforcement
TOTAL
           $15,577.1  $18,741.1  $16.956.9  $16,109.2  $13,181.0  -$2,928,2
              $606.1   $2,514.2   $1,114.2     $829.0     $176.9    -$652.1
            $2,971.8
                       $1,400.0     $324.8
-$324.8
           $15,577.1  $18,741.1  $16,956.9  $16,109.2  $13,181.0  -$2,928.2
            $3,577.9   $2,514.2   $2,514.2   $1,153.8     $176.9    -$976.9
$19,155.0  $21,255.3  $19,471.1  $17,263.0  $13,357.9  -$3,905.1

-------
                                             WATER QUALITY

                                        Water Quality Enforcement

                                     ACTUAL    JAMUARV     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME WORKYEARS
Water Quality
Enforcement
TOTAL PERMANENT HORKYEARS
TOTAL WORKYEARS
Hater Quality
Enforcement

453.7 514.0 473.4 431.6 326.1 -105.5
4S3.7 514.0 473.4 431.6 326.1 -105.5
517.6 576.3 526.9 479.7 365.7 -114.0
TOTAL WORKYEARS                       517.6      576.3      526.9      479.7      365.7    -114.0

-------
                                  WATER QUALITY

                            Water Quality Enforcement
Budget Request
     The Agency requests  a total  of $13,357,900 and  326.1 permanent  workyears
for 1983,  a  decrease  of  $3,905,100  and 105.5  permanent  workyears  from  1982,
Included In the total  is  $13,181,000 for Salaries and Expenses  and $176,900  for
Abatement, Control and  Compliance,  with  a  decrease  of  $2,928,200 and  $976,900
respectively.  The decrease primarily  reflects  the  transfer of  legal  activities
to the Office of Legal  and Enforcement Counsel.

Program Description

     Water Quality Enforcement—  The  National   Pollutant Discharge  Elimination
System (NPDES) Enforcement"Program monitors compliance,  initiates  administrative
enforcement actions,  and  provides  technical support  for enforcement  litigation
against violators  of NPDES  permits.  The  compliance  status of  permittees  is
monitored through  on-site  inspections  and/or   the  review  of   self-monitoring
reports.   Administrative or judicial action is initiated in cases  of  significant
noncompliance.  In 1983, this  subactivity covers compliance monitoring,  compli-
ance strategy development, and  administrative enforcement remedies.  Legal  case
development and referral   of  actions  to  the Department  of  Justice are  covered
in the enforcement operations subactivity.

     Compliance monitoring of NPDES permittees  is  a major function under  this
subactivity.   Monitoring  is  conducted through  on-site  inspections and  through
self-monitoring conducted by the permittee and reported  to the Agency.   A quality
assurance program ensures the integrity of self-monitoring data.

     Identification of noncompliers, initiation  of  action to  secure  compliance,
and negotiation leading  to administrative  enforcement  resolution  are the  major
functions of this subactivity.  Where  negotations are ineffectual,  cases  will  be
referred to the Office  of  Legal  and Enforcement Counsel  for action  and possible
referral  to the Department of Justice.  Technical  support for such referrals  is
provided as a function of this subactivity.

     In addition to  the  NPDES portion  of the Water Quality  Enforcement  Program,
administrative and technical  support is provided for the  issuance  of  administra-
tive actions against  violations of the Spill Prevention  Control  and  Countermeas*
ure Plan requirements.   Referrals  are made to  the U.S.  Coast  Guard  for  civil
penalty assessment for  oil  and hazardous  substance spill  violations  (Section
311(b)(6) (A)) in  waters  where EPA  has  jurisdiction,  and inspection  support  is
provided for  enforcement   against  illegal  dredge and  fill  activities  (Section
404).

     Water QualityEnforcement » Office of Legal  and Enforcement  Counsel  —  This
program element: provides contract  funds  to  support  a  portion  of the  enforcement
data system and to assist  in  case  development and training  activities  related to
Water Quality Enforcement.

WATER QUALITY ENFORCEMENT                 ;

1981 Accomplishments

     In 1981  the  Agency   obligated  a total  of  $19,155,000  for  this  program,
including $15,557,100 for  the Salaries and  Expenses appropriation  and  $3,577,900
for the Abatement, Control and Compliance appropriation.

     Contract resources were  used  to meet ADP information  needs, provide techni-
cal and  legal  case  support,  and   conduct  monitoring and  inspection  training.
During 1981,'the  activities  supporting enforcement actions in  emergency  situa-
                                      WQ-T11

-------
tions involving  substantial  threats  to public  health  and  safety received  the
highest program priority.

     Enforcement against municipal  facilities that missed  the secondary treatment
deadline of July 1,  1977,  was  also a priority.   Approximately 140 Administrative
Orders under Section 301(A)(5)(a)  were  issued in 1981.   Permit,  enforcement,  and
construction grant activities are  coordinated to  expedite municipal construction
and increase municipal  compliance.

     Seventeen major source enforcement cases against industrial  facilities have
been brought to conclusion.

     Regional Offices conducted  2,800 compliance inspections, issued  69  Notices
of Violation and 562 Administrative Orders, and referred  37  cases to  the  Depart-
ment of Justice.   In States  without approved NPDES programs, EPA  reviewed  major
discharger self-monitoring reports.

     Enforcement of Section  311  oil  and hazardous  substance spill requirements
consisted of 672 referrals to the U.S. Coast Guard for assessment of civil  penal-
ties and 406 administrative actions for violation of Spill Prevention  and  Control
Counter-measure plan requirements.

     Enforcement of Section  404  provisions  focused  on  identifying illegal  dis-
charges of dredge  and fill  material.   Twenty administrative actions  were  taken.

1982 Explanation of Changes from January Budget  Estimate

                      January         March         Current
                     Estimate       Estimate       Estimate

                   $21,255,300    $19,471,100   $17,263,000

     The net decrease of -$3,992,300 results from  several  actions, as follows:

     •  January -March.   (-$839,200)  This  change represented  a  decrease  of
     $839,200 from the  January  budget, all  of  which  was  for  Salaries and  Ex-
     penses.  This reduction  resulted in a decrease in pretreatment  enforcement
     activities,

     "  Reorganization.    (-$945,000)   These  resources  were  moved to  Technical
     Support -  Office   of  Legal  and  Enforcement Counsel  (National  Enforcement
     Investigation Center  -  NEIC).  The functions  supported by  these  resources
     remain the same; the  new  program element for NEIC was  created,  (a)  so that
     their resources could  be more readily identified  and (b)  organizational ly>
     the center now  falls under the  responsibility of the  Office of Legal  and
     Enforcement Counsel.  As a result  of  an  Agency  restucturing these  resources
     were later moved to the Interdisciplinary program  under one program element.
     This reflects the  consolidation  of these similar activities providing  quick
     technical response  in emergency situations.

     •  Reprogramminq.    (-$42,100)   During   the  development  of  the  operating
     plan, several  miscellaneous   reprogrartimings,  which  are not  reportable  to
     Congress, were made to this  activity  and  resulted in a  net decrease  of
     -$42,100.                              •

     -  Congressional Actions.    (-$1,895,200)   A  reduction  of  -$720,600  was
     taken against the  March estimate reflecting  the September  12% reduction  to
     the Abatement, Control and  Compliance appropriation.  This  reduction affec-
     ted contract  resources  in Region IX and Headquarters enforcement.   The  im-
     pact of this  reduction  Is minimal due  to  a rescheduling of priorities  and
     greater in-house efficiencies afforded  by new equipment  that will  enable
     lab analyses  to  be  conducted  by  EPA  personnel.    Support   of  enforcement
     activities will  be  reduced as well  as  support t"o the Agency's docket  system.
                                      WQ-112

-------
        An additional  reduction  of -$1,174,600  was applied to the  Salaries and
     Expenses ($919,800) and  Abatement,  Control  and Compliance ($254,800) appro-
     priations to meet Congressionally mandated appropriation levels-

     -  Transfer Authority.   (-$270,800)  The  net decrease applied  to  this act-
     ivity includes  a  decrease of  -$385,000 to Abatement,  Control  and Compliance
     and an  increase of +$114,200  to Salaries  and  Expenses.   These funds were
     moved to Technical Support-Office of Legal  and Enforcement Counsel.   In addi-
     tion, the funds will  be used to cover expenses  for the rental of word proces-
     sing equipment.

1982Program

     The Agency  is  allocating a total  of $17,263,000 and 431.6 permanent  work-
years to  this  program, of which  $16,109,200  is for  Salaries and  Expenses and
$1,153,800 is for  the Abatement,  Control  and  Compliance  appropriation.  During
1982, the program will continue  to emphasize achieving an  improved  rate of muni-
cipal compliance while working to  promote cooperation between  Headquarters, Reg-
ional, and State agencies.

     The compliance  program  will   encourage the  development  of  greater  State
technical expertise  and  will encourage  States  to assume more of the compliance
monitoring activities.  A  revised  strategy  for the compliance inspection program
will be developed.   A  neutral inspection scheme, to satisfy the judicial, require-
ment for  objective  random  selection  of  candidates for compliance  inspections,
will be implemented.   A system will also  be developed for  establishing  a statis-
tical basis for  tracking  compliance of major and minor  industrial  and  municipal
permittees.  An estimated  2,200  compliance  inspections will  be conducted.  Eight
NPDES compliance monitoring training  and  guidance manuals  developed  in  1981 will
be put  into  use.  Quality assurance  will  become a  more  important   part  of the
program.

     Approximately 720 administrative orders  and notices  of  violation  will  be
issued.  Non-NPDES administrative enforcement activities are expected to increase
to 576  actions under the spill control  program, 890 oil  and hazardous substances
spill referrals  to  the U.S.  Coast Guard,  and  150  dredge and fill  inspections
planned.

     Support will be provided to  help delegated States develop their  municipal
management systems and maintain  their data  systems.   The National  Permit Compli-
ance ADP system, used  by both States and Regions, will be maintained.

1983 Program Request

     The Agency  requests   a  total  of  $13,357,900 and 326.1  workyears  for this
program, of which $13,181,000 is for  the Salaries and Expenses appropriation and
$176,900 for the Abatement,  Control  and  Compliance appropriation.   This  is  a
decrease of  $2,928,200 and  $652,100  respectively.   The reduction  in   resources
for this activity from 1982 to 1983 is attributable, in part, to a reorganization
within the Agency of enforcement responsibilities.  All  resources associated with
case development and legal  activities have  been transferred to the  new  Office of
Legal and  Enforcement  Counsel.   The  Office of  Water  will  continue  to identify
and respond  to   instances  of  noncompl lance  with permit  requirements   and  seek
resolution through  negotiations,  administrative  remedies, or referrals  to the
Office  of Legal  and  Enforcement  Counsel  for further action.  In  1983 significant
progress will be made  by the Office of Water in two key areas:   municipal compli-
ance and compliance by Industrial facilities with second-round permits.

     Improvement in Municipal Compllance

     The NPDES program will  continue  to  focus on improving the rate of  municipal
compliance.  Support will  be provided for the municipal  management  system, which
promotes coordination  of  permitting,  compliance  monitoring, and  construction
                                      WQ-113

-------
grant priorities.  The Agency  will  continue the program for  tracking  compliance                  '   ,.
of major and minor municipalities on a  statistical  basis.   Review and  evaluation                     1
of compliancG of Federally funded permittees  will  be developed  and  implemented
with the support  of the  Municipal  Waste Treatment Facility Construction  and  Op-
erations activity.  Where Instances of  noncompliance  occur, municipal  operations
and maintenance  procedures will be  evaluated  to determine the cause of the  vio-
lation.  When inadequate operation and  maintenance  is determined to be a causal
factor of  violation,  the  Agency  will   audit  prior years'  municipal   budget  and
operations records to determine if the problem is a result  of inadequate  funding
through the EPA-approved user charge system.

     Effect i veCompl i a neeHoni tori ng

     We expect to Improve the quality of self-monitoring data  submitted by NPDES
permittees through the Monitoring Report Quality  Assurance  program.  The  compli-
ance inspection program will  be managed and necessary  follow-up  activities coor-
dinated.  Regional operating  efficiency in the compliance review area  will  be
enhanced through  reform of discharge monitoring  report requirements and improved
compliance inspection strategies.   Technical  support  to  legal programs  will  be
provided and more resources will  be allocated  to improving the technical  capabil-
ities of State a  programs  in  order  for the States to assume  more  of the  compli-
ance monitoring activities.

     Headquarters will review and  evaluate Regional  compliance programs,  give
guidance on  compliance  policy and  enforcement  remedies,  and provide technical
and administrative  support as  necessary.   Regional   administrative  enforcement
activity will be  monitored to ensure consistent implementation  of  national  pol-
icy.  The Permit  Compliance ADP  System (PCS)  will be  strengthened  and improved,
and additional NPDES States will  be encouraged to use PCS.

     Non-NPDES administrative enforcement activities will  continue at  or slightly
above the 1982 level.  Technical assistance and support will  be provided to the
Office of Legal  and Enforcement Counsel in the development of civil and  criminal
referrals to the Department of Justice.

WATER qUALITY ENFQRCEMEfrr - OFFICE  OF LEGAL AMD ENFORCEMENT COUNSEL

1981 Ac com \ is; hmenits

     The Agency  obligated  $2,971,800 in Abatement,  Control and  Compliance funds
to provide  support to  the  enforcement  docket  system,  case development,  and
training efforts.

1982 Explanation of^hanjes frpm January Budget Estimate

                      January         March         Current
                     Estimate       Estimate       Estimate

                                   $1,400,000       $324,800

     The net  increase of  +$324,800 results  from  several  actions, as  follows:

     -  Reorganization.  (+$1,400,000)  Resources totaling $1,400,000  were moved
     to Water Quality  Enforcement to form this  newly established office to support
     case development and systems development activities*  The functions Supported
     by these resources  remain the  same;  the new  program  element for NEIC  was
     created, (a)  so  that  their  resources  could  be more readily  identified  and
     (b) organizationally the  center now falls  under the responsibility  of  the
     Office of Legal  and Enforcement Counsel.

     -  Congressional  Actions.  (-$737,200)  A  reduction  of  -$571,200 was taken
     against the  March estimate, reflecting the 12% reduction to  the  Abatement,
     Control and  Compliance  appropriation.  This reduction will  reduce enforce-
                                     WQ-114

-------
     ment activities as well  as  the Agency's  docket  system.   An  additional  reduc-
     tion of  -$166,000 was  applied to  the  Abatement,  Control  and  Compliance
     appropriations to meet Congressionally mandated appropriation levels.

     -  Transfer Authority.  (-$338,000)  These  funds  were transferred to  Tech-
     nical Support - Office of Legal  and Enforcement Counsel.

1982 Program

     The Agency is allocating $324,800  in Abatement, Control  and Compliance funds
to provide support to the enforcement docket  system, ease development,  and  train-
ing efforts.

1983 Program Request

     The Agency requests no  funds  for  this program  element  in 1983.  Development
of the docket system  has  been completed and  the case development  functions  will
be centralized and  carried out  by the  Office  of Legal and  Enforcement Counsel.
                                      WQ-115

-------
                                             MATER QUALITY

                                    Water Quality Permits Issuance
                                     ACTUAL
                                     1981
              JANUARY
             ESTIMATE
               1982
           MARCH
         ESTIMATE
           1982
          CURRENT   ESTIMATE INCREASE +
         ESTIMATE    1983    DECREASE -
           1982            1983 VS 1982
PROGRAM
Permits Issuance
 Salaries 8 Expenses
 Abatement Control *
 Compliance

TOTAL:
 Salaries « Expenses
 Abatement Control &
 Compliance

Water Quality Permits  TOTAL
Issuance

PERMANENT FULL-TIME MORKYEARS
                                             (DOLLARS IN THOUSANDS)
 $7,109.9   $9,767.9   $7,820.9   $7,146.2   $6,986.6   -$159.6
 $4,294.0   $7,329.6   $6,984.5   $4,314.0   $3,209.9 -$1,104.1
 $7,109.9   $9,767.9   $7,820.9   $7,146.2   $6,986.6   -$159.6
 $4.294.0   $7,329.6   $6,984.5   $4,314.0   $3,209.9 -$1,104.1
$11,403.9  $17,097.5  $14,805.4  $11,460.2  $10,196.5 -$1,263.7
Permits Issuance

TOTAL PERMANENT MORKYEARS
    R08.9

    208.9
260.3

260.3
199.6

199.6
1B9.1

189.1
163.9

163.9
-25.2

-25.2

-------
     WATER QUALITY
Water Quality Permits Issuance

TOTAL

WORKYEARS
Permits Issuance
TOTAL WQRKYEARS
ACTUAL
1981
246.5
246.5
JANUARY
ESTIMATE
1982
317.5
317.5
MARCH
ESTIMATE
1982
253.3
253.3
CURRENT
ESTIMATE
1982
237.5
237.5
ESTIMATE INCREASE
1983 DECREASE
1983 VS 19(
206
206
.3 -31.2
.3 -31.2

-------
                                  WATER QUALITY

                                 Permits Issuance

Budget Request

     The Agency requests a total  of $10,196,500 and 163.9 permanent workyears for
1983, a decrease of $1,263,700 and  25.2 permanent  workyears  from 1982.   Included
in this total  is $6,986,600  for  Salaries and Expenses and $3,209,900 for  Abate-
ment, Control and Compliance, representing a decrease of $159,600 and $1,104,100,
respectively.

Program Description

     The NPDES permit program  is  part  of a comprehensive effort  provided  by the
Clean Water  Act to  reduce or  eliminate point  source pollution  from industrial,
municipal, commercial, and  agricultural discharges.   The Act prohibits the  dis-
charge of  pollutants  into all waters  of the  United States  unless a permit  is
issued by EPA or an EPA-approved  State  program.

     the permit is  a mechanism for imposing discharge limitations on point  source
dischargers based on  national  effluent limitation guidelines,  national  perform-
ance standards  for  new  source facilities,  or  water quality standards.  Where
national effluent limitation guidelines have not been promulgated  for a  particu-
lar industrial discharger, the effluent limits are set by the permitting author-
ity using best professional judgment based on available  and  economically  feasible
abatement technology.  Those permits are  issued  case by  case.   Additionally,  if
at a given facility, established  national  effluent limits will  not reduce  pollu-
tants enough to meet the ambient  water  quality standards  set by  the State or  EPA,
the permit imposes  more stringent  limitations to  meet  the  water  quality  stand-
ards.  Permits also include time  schedules  which specify deadlines for pollutant
reduction.

     Controlling discharges of priority pollutants including  toxics is the major
emphasis of  the NPDES  permit  program.   Direct  discharges  of these pollutants
into navigable waters are  controlled by the inclusion of Best Available  Technol-
ogy (BAT) limitations into industrial  permits.   Indirect discharges of  priority
pollutants, that is,  industrial  discharges to publicly  owned  sewerage  systems,
are controlled  though  the pretreatment program.   This  program,  established  by
the Act, gives municipalities and States the primary  responsibility for enforcing
national pretreatment standards.

     Another important function of  the  NPDES program is  providing  technics]  sup-
port for evidentiary hearings  held  on  the terms, conditions, and  effluent limi-
tations in permits and  requests  for variances from permit effluent limitations.
EPA also  conducts  nonadversarial panel  hearings   for municipalities which  have
requested marine discharge modifications under Section 301(h) of the Clean Water
Act.  Nonadversarial  panel hearings  are used in issuance of an NPDES permit  to
a discharger that has not previously held  an NPDES  permit,  as  well as in deci-
sions on variances  requested by direct  dischargers.

     A primary  function  of  the   permit  program  is  the  encouragement  of State
assumption of responsibility  for the NPDES program.  At  present,  33 States .and
one Territory have  approved NPDES programs.,

PERMITS ISSUANCE

1981 Accomplishments

     In 1981 the Agency  obligated a total  of  SI 1,403,900 for this program, in-
cluding $7,109,900   for  the  Salaries  and  Expenses appropriation  and $4,294,000
for the Abatement,  Control and Compliance appropriation.
                                     WQ-118

-------
     In 1981,  EPA  issued a total  of 474  major and  1,345  minor permits.   (EPA
classifies dischargers as "major"  or "minor" depending on the  volume,  strength,
toxics, and  potential  environmental   consequences of  their  effluent.)   Of  the
1,819 permits issued, 229 were major  industrial  permits;  1,230,  minor industrial;
245, major municipal;  and  115,  minor municipal.  Permit issuance activities  in-
cluded assistance  to  the   pretreatment  program,  technical  guidance  on  second
round permit issuance  with  emphasis  on  toxic control and updating  of the  infor-
mation system.

     In 1981, industry teams,  composed  of EPA Regional, Headquarters,  and  State
personnel, were established  to develop  primary  industry permits,  which  include
permits for  industries with  priority pollutants.  These teams assisted  in  trans-
lating guidelines into permit conditions and  in developing permit conditions  for
industrial subcategories where guidelines were not scheduled.

     EPA began  in  1981 to  issue  resource-saving  general  permits to operations
with similar discharges.  Three general  permits were issued for over 2,000  off-
shore oil and  gas  exploratory drilling  and production  operations.   Additionally,
one draft permit has been published  and  two  additional draft  permits were  devel-
oped for  many  of the  Outer Continental Shelf  (DCS) operations  in the Gulf  of
Mexico and the Pacific Ocean.

     A review of  all permitting regulations, policies,  and  procedures  began  in
1981 to  streamline  the  permitting  system  by reducing  paperwork  and  reporting
burdens on permittees,  and to  encourage  State program  approvals.   This  effort
represents the  Headquarter's  highest priority activity.   Additionally,  proposed
regulations were published  which  provide procedures  for evaluating  requests  for
extension of compliance  deadlines  where innovative  technologies  are to be  used
for controlling toxic or nonconventional pollutants  [Section 301(k)  of  the  Clean
Water Act].

     A regulatory  impact  analysis of the general pretreatment regulations  has
been drafted, and will  serve  as the  basis for revising  pretreatment regulations
and policies.

     EPA directed its  efforts to  the development  of local pretreatment programs
and to  the development  of  State capacity  to receive  pretreatment authority.
More than 75%  of  existing  municipal  permits were modified to contain compliance
schedules or re-opener clauses  requiring  development  of POTW  pretreatment  pro-
grams.

1982 Explanation of Changesfrom January BudgetEstimate

                      January         March        Current
                     Estimate      Estimate       Estimate

                   $17,097,500    $14,805,400    $11,460,200

     The net decrease  of -$5,637,300 results from  several  actions, as  follows:

     -  January - March.  (-$2,141,300)   This change  represented  a decrease  of
     $2,141,|00 from the January budget, of which  $1,796,200  was for Salaries and
     Expenses and $345,100  was  for  Abatement,  Control  and Compliance.  The  de-
     crease resulted in less overview of approved NPDES  State programs  and  State
     and local pretreatment programs  in  non-NPOES  States.

     -  Reorganigation.   (-$150,800)   These  resources  were  moved   to  Technical
     Support -Office of  Legal  and Enforcement Counsel  (National  Enforcement
     Investigation Center-NEIC).   The  functions  supported  by  these  resources
     remain the same;  the new program element for NEIC was created, (a)  so  that
     their resources could  be more readily identified  and,  (b)  organizationally,
     the center now  falls under the responsibility  of the  Office   of Legal  and
     Enforcement Counsel.   As a  result of  an agency  restructuring, these  re-
                                     WQ-119

-------
     sources were later  moved to  the Interdisciplinary  program  under one  pro*
     gram element.  This reflects  the consolidation of  these  similar activities
     providing quick technical response in emergency situations.

     "  Reprogramming.  (-$402,300) During the development of the operating plan,
     several miscellaneous reprogrammings, which are not  reportable to Congress,
     were made to  this activity  and  resulted  in  a net  decrease  of -$402,300.

     -  CongressionalActions.   (-$2,945,700)   A  reduction  of -$2,128,500  was
     taken against theMarch  estimate reflecting  the September 12% reduction to
     the Abatement, Control  and  Compliance  appropriation.   Support to  Regions
     for evidentiary  hearing  settlement  and  Section  301(h)   variance  hearings
     will be reduced.  These  contracts are  used  for assisting in  resolving ap-
     peals by  industries   on  permit   conditions.   Additionally,  all  contracts
     dealing with consolidated  permitting will be  eliminated.  Contracts to be
     eliminated include one for development  and implementation  of a consolidated
     permitting strategy and another for working with Regions and national  pollu-
     tion discharge elimination  system States to explain  procedures  for  eviden-
     tiary hearings,  public  hearings,  and  nonadversary  hearings.   There  will
     be further reductions in the areas of publicly owned treatment works  program
     submittals,  categorical determinations,  and variance determinations.

        An additional  reduction of  -$817,200 was  applied to  the Salaries  and Ex-
     penses ($332,900) and  Abatement, Control  and  Compliance  ($484,300)  appro-
     priations to meet Congressionally mandated appropriation levels.

     -  Transfer Authority.  (+$2,800)  The net increase applied to this activity
     includes a decrease of -$49,700  to Abatement,  Control and  Compliance and an
     increase of +$52,500 to Salaries and Expenses.

1982 Program

     In 1932 the  Agency  is  allocating  a total  of $11,460,200  to  the  permits
issuance program,  of which $7,146,200 is for  Salaries and Expenses and $4,314,000
for the  Abatement,  Control   and   Compliance  appropriation.   Contracts  provide
support for technical  assistance  for  permit  writers, regulation  reform,  eviden-
tiary hearing  support,  pretreatment   program  assistance,  and  general  program
operations.

     In 1982 the program will continue to issue second  round permits which  will
focus primarily on areas with known or suspected impairment of use attributable
to water pollution and industrial  categories where  effluent  guidelines have  been
established or where  such  guidelines  are  not  scheduled to  be  established.   The
Agency estimates that  some  350  major  industrial  permits will be  issued  in 1982.
Because of the complexity  of  these permits,  we expect that there will be  a  sig-
nificant increase in  appeals  of permit  conditions; four times as  many appealed
permits will be  resolved  during  1982 than  were resolved  in 1981.   The  Agency,
under some  circumstances,  may modify  effluent limitation  requirements  contained
in NPDES permits.   In 1982  we  expect  variance  requests from  BAT or  secondary
treatment requirements to  increase  substantially.   Because  of  the  concentration
on issues surrounding  industrial permits, EPA  will  Issue few if any major munic-
ipal permits during 1982.

     During 1982,  priority  again will  be  given to  issuance of  general  permits
to be used  extensively for  the  Outer  Continental  Shelf (DCS)   and  other  general
permitting areas.   An  additional  20 OCS or other general permits will  be  issued
during 1982.

     Work will  continue on  completing an  EPA and Office  of  Surface Mining Memo-
randum of Understanding which provides for  issuing joint permits to  coal  mining
activities.  This  agreement  could lead  to  implementation  of  a  joint  permit
issuance program in late 1982.
                                     WQ-120

-------
     Major emphasis will  continue on revising permitting and  pretreatment  regu-
lations.  We  estimate  that proposed  revisions to  existing consolidated  permit
regulations and the  general  pretreatment  regulations will  be published  during
1982.  The Section 301(k)  proposed regulation  for  innovative technologies  should
be made final  in  1982.  Revision of  permit  application  forms  will  continue  for
existing industries as will development  of new application forms  for  new  source
industries and publicly owned treatment works.

     Efforts will  be intensified to encourage and  assist  States in requesting  and
receiving approval of  their programs  or  approval  of modifications to  their pro-
grams.  An additional  two  States are expected  to be  approved  for administration
of the  NPDES program;  an  additional  four  States are expected  to  receive pre-
treatment authority; an additional seven should receive  Federal  facility author-
ization.

1983 Program Request

     The Agency requests  a total  of $10,196,500 and  163.9 permanent  workyears
for the NPDES  permits  issuance program of  which  $6,986,600 is for  the  Salaries
and Expenses  appropriation and  $3,209,900  is for  the  Abatement,  Control  and
Compliance appropriation.  This  is a decrease  of  $1,263,700 and  25.2 permanent
workyears and  reflects the Agency's  focus  on  issuing second round  permits only
for industries where guidelines  have been promulgated or where no guidelines  are
scheduled and in areas with known  or  suspected impairment  of use attributable to
water pollution.

     These resources will  be used  primarily for major permit issuance and  assoc-
iated activities,  including resolution of evidentiary hearings  and determinations
on variance requests for municipalities and industries.

     Industrial Permits and Variances

     Highest priority  will be  given to issuing industrial permits for  control  of
priority pollutant discharges.   Included in those  permits  will   be  the  issuance
of 220 major  industrial  permits,  60  energy and new source  permits,  and  15  Outer
Continental Shelf and  other  general  permits.  Variance criteria  regulations  are
to be promulgated  in  1982, and  the  numbers of  requests  from industries  should
be significant in 1983.  This program will  direct efforts toward  providing timely
and appropriate decisions on the requests.

     The resolution of evidentiary and  panel hearings for  major  industrial dis-
charge permits will also continue to be an important activity in  1983.

     MarineDischarges

     In 1983 permits will  be issued with Section  301(h)  modifications to munici-
palities discharging  into marine  waters.   These modifications  will  reduce  the
cost of complying  with Clean Water Act  standards when municipalities are able to
discharge into marine waters without adverse environmental  impact.

     State Assistance

     Resources will be directed  to assisting in the development  and approval  of
State NPDES  programs.   Included are new  State NPDES programs and modifications
by States  already having  NPDES  authority  including assumption  of pretreatment,
Federal facilities, or other  major program  authorities.   Some resources will  be
directed to  further the  development  of the  pretreatment program, which provides
control over  indirect  discharges  of pollutants  into  municipal  treatment systems.
These efforts  will  focus  primarily  on  developing and approving  POTW  and  State
pretreatment programs  required  by  Section  402(b)(8)  of  the  Clean Water Act.
                                     WQ-121

-------
     Regulatory Reform

     A major initative  in 1983 will  be  to complete the  review and revision  of
existing policies and regulations  to reduce paperwork,  improve application forms,
and eliminate unnecessary  or overly  burdensome  requirements.  This effort  will
assure the maximum possible  streamlining of permit issuance  procedures  and  will
encourage States to administer NPOES programs.

     Additionally, major efforts  will  be directed at  reducing the resource de»
mands of permit issuance through use  of  general  permits and through coordination
with other Federal  agencies  to eliminate  unnecessary  duplication of  resources.
                                     WQ-122

-------
Drinking Water
     SECTION TAB

-------
Page Intentionally Blank

-------
                                             DRINKING WATER
                                    ACTUAL
                                     1981
                    JANUARY
                    ESTIMATE
                      19B2
                         MARCH
                        ESTIMATE
                          1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
APPROPRIATION
                                          (DOLLARS IN THOUSANDS)
 Salaries & Expenses
 Abatement Control 4
 Compl tance
 Research & Development

TOTAL, Drinking Hater
       $20,749.9  $25,770.5  $24,643.9  $24,269.7  $24,515.9     $246.2
       $44,092.3  $44,413.8  $42,090.5  $40,989.9  $31,775.9  -$9,214.0

       $14,487.5  $21,487.8  $20,911.7  $18,571.5  $13,458.3  -$5,113.2

       $79,329.7  $91,672.1  $87,646.1  $83,831.1  $69,750.1 -$14,081.0
PERMANENT FULL-TIIC WORKYEARS
TOTAL HQRKYEARS
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
Drinking Mater Non-
Energy
 Salaries 4 Expenses
 Research & Development

 Salaries 4 Expenses
 Research 4 Development
RESEARCH 4 DEVELOPMENT
           492.4      550.0      514.1      499.4      455.5      -43.9
           590.5      672.4      635.1      620.6      550.8      -69.8
       $87,824.5  $71,666.0  $66,353.0  $97,944.7  $83,882.7 -$14,062.0
      $107,447.0  $90,000,0  $90,000.0  $90,000.0            -$90,000.0
TOTAL
 $7,363.9   $8,939.1   $8,801.0   $9,782.0   $9,447.2    -$334.8
$14,487.5  $21,487.8  $20,911.7  $18,571.5  $13,458.3  -$5,113.2

 $7,363.9   $8,939.1   $8,801.0   $9,782.0   $9,447.2    -$334.8
$14,487.5  $21,487.8  $20,911.7  $18,571.5  $13,458.3  -$5,113.2
$21,851.4  $30,426,9  $29,712.7  $28,353.5  $22,905.5  -$5,448.0

-------
                                                                       DRINKING WATER
g
                                                     ACTUAL    JANUARY     MARCH     CURRENT    ESTIMATE  INCREASE  +
                                                       1981     ESTIMATE    ESTIMATE   ESTIMATE     1983    DECREASE  -
                                                                  1982        1982        1982            1983  VS  1982
Drinking Water
Criteria, Standards & Guidelines
 Salaries & Expenses
 Abatement Control &
 Compliance

Drinking Water State
Program Resource Assistance
 Abatement Control S
 Compliance

Drinking Water
Management
 Salaries a Expenses
 Abatement Control &
 Compliance
                                                    $5,027.9
                                                    $3,642.4
                                                               (DOLLARS  IN  THOUSANDS)
         $6,038.3   $5,619.0   $5,009.8   $5,540.0     $530.2
         $3,827.8   $3,594.6   $2,391.5   $2,675.7     $284.2
                  Salaries A Expenses
                  Abatement Control &
                  Compliance
                 ABATEMENT 4 CONTROL

                 Drinking Water
                 Enforcement
                  Salaries & Expenses

                  Salaries & Expenses
                 ENFORCEMENT
                                                   $39,421.5   $39,524.5   $37,524.5   $37,847.5   $29,100.2   -$8,747.3
                                                    $7,619.9    $9,822.2    $9,305.7    $8,633.2    $8,672.6       $39.4
                                                    $1,013.4    $1,061.5      $971.4      $750.9                -$750.9
                                 $12,647.8  $15,860.5  $14,924.7  $13,643.0  $14,212.6     $569.6
                                 $44,077.3  $44,413.8  $42,090.5  $40,989.9  $31,775.9  -$9.214.0

                          TOTAL  $56,725.1  $60,274.3  $57,015.2  $54,632.9  $45,988.5  -$8,644.4
                          TOTAL
$738.2

$738.2
$738.2
$970.9

$970.9
$970.9
$918.2

$918.2
$918.2
$844.7

$844.7
$844.7
$856.1

$856.1
$856.1
$11.4

$11.4
$11.4

-------
                                                                DRINKING WATER
i
OJ

TOTAL PERMANENT WORKYEARS
Drinking Hater Non-
Energy
RESEARCH * DEVELOPMENT TOTAL
Drinking Water
Criteria, Standards A Guidelines
Drinking Water
Management
ABATEMENT « CONTROL TOTAL
Drinking Water
Enforcement
ENFORCEMENT TOTAL
TOTAL WORKYEARS
Drinking Water Non-
Energy
RESEARCH 8 DEVELOPMENT TOTAL
Drinking Water
Criteria, Standards & Guidelines
Drinking Water
Management
ABATEMENT * CONTROL TOTAL
Drinking Water
Enforcement
ENFORCEMENT TOTAL
ACTUAL
1981
142.5
142.5
94.5
232.5
327.0
22,9
22.9
185.3
185.3
116.0
262.6
378.6
26.6
26.6
JANUARY
ESTIMATE
1982
153.1
153.1
109.3
259.2
368.5
28.4
28.4
203.5
203.5
127.6
309.3
436.9
32.0
32.0
MARCH
ESTIMATE
1982
150.9
150.9
96.3
239.2
335.5
27.7
27.7
201.3
201.3
114.6
2§9.3
403.9
29.9
29.9
CURRENT
ESTIMATE
1982
143.9
143.9
91.8
236.6
328.4
27.1
27.1
193.8
193.8
111.1
286.4
397.5
29.3
29.3
ESTIMATE INCREASE «•
1983 DECREASE -
1983 VS 198!
132.3
132.3
87.2
210.3
297.5
25.7
25.7
169.6
169.6
102.2
253.3
355.5
25.7
25.7
-11.6
-11.6
-4.6
-2€.3
-30.9
-1.4
-1.4
-24.2
-24.2
-8.9
-33.1
-42.0
-3.6
-3.6

-------
                                  DRINKING WATER
OVERVIEW AND STRATEGY

     EPA's drinking water  program provides the  framework  for ensuring  that  the
nation's public drinking water  supplies are  free  from contamination  harmful  to
human health.  The  Safe Drinking Water  Act (SDWA) of  1974,  while charging  EPA
with responsibility for  setting national drinking  water  standards and  ensuring
compliance by the nation's public water  supplies,  clearly  intended  the States to
assume primary responsibility  for implementation.   Under  the Act,  EPA  is  also
required to  regulate  underground injection wells  to prevent endangering  under-
ground drinking water sources and to  protect  aquifers that are sole or principal
sources of drinking water.  The Act also authorizes the Agency to actively rein-
force State and local  efforts to meet their responsibilities  by  providing scien-
tific and financial assistance.

     States are delegated primary enforcement  responsibility, or "primacy",  for
the Public Water  Systems Supervision (PWS) and Underground Injection Control (UIC)
programs when they adopt  regulations  that meet Federal requirements for minimum
acceptable levels of protection.  In  the absence of State action  and where States
have no jurisdiction, however,  EPA is required to  implement  the regulatory  pro-
grams.  The  Office of  Research and  Development contributes to the  scientific
basis for the  regulatory programs,  assesses  and develops  new technologies  and
analytic procedures to conduct the programs in an  efficient  manner, and produces
information that  helps  States  and localities in providing   safe drinking water
supplies.

     For the PWS  program,  the  principal  strategy has  been  to  build  a  national
program in  stages.  The  first  stage  was establishing an institutional  framework
with the  States   through  the delegation of  primary  enforcement  responsibility
where States were  willing to accept it.  Priority was  given  to assure  compliance
by major systems  with the largest service populations  or most acute health risks
and to minimize the regulatory  burden of resource-intensive  activities.   As  the
Federal-State framework has been established,  emphasis for  the States and Regions
has changed  to  maintain  the   level   of  protection  achieved  and  to  increase
emphasis on  compliance  by other  systems.   EPA has also turned  its  attention to
assessing new types and new sources of potential contamination of drinking water
sources such as volatile organic chemicals  occurring  in ground water supplies at
high levels.  By  the  end  of 1981, 49 States  and  Territories  had assumed primacy
for the PWS program.

     We expect this high rate of delegation for the Underground Injection Control
program as  well.   Final  UIC program  regulations  were promulgated   in  July 1980,
with full  State   participation  envisioned  within  two years.  The  State  grants
have played  a  role in  these  efforts, contributing to  the overall   State  effort
and also working as a inducement to  State action.

     Current priorities concentrate on three main responsibilities:

     1)  to comply with the  SDWA mandate of establishing  revised drinking water
         regulations,  EPA will:

         a) review and revise the existing regulations,  in  light of new scientific
            information, with the goal  of  reducing the regulatory  burden while
            maintaining the protection of public health;

         b) develop  standards  for   currently  unregulated  contaminants,  where
            needed.

     2)  to  promote  compliance  with  the National  Primary Drinking Water Regu-
         lations in both  primacy and non-primacy  -States,  and to  protect public
                                      DW-4

-------
         water  supplies  from  harmful   contamination through  a  combination  of
         regulatory and advisory activities.

     3)  to  protect  subsurface waters through identifying the  nature and extent
         of  ground water contamination in both primacy and non-primacy States and
         initiating and  delegating the  Underground  Injection  Control  Program,

Review and Revise Drinking Water Regulations

     National Interim  Primary  Drinking  Water Regulations  (NIPDWR)  for bacteria,
turbidity, several  inorganics,  radidnuclides,   and  a  few  organic  pesticides
have been  in effect  since 1977.  EPA  set trihalomethane (THM)  standards in 1980,
The SDWA  mandates that  the  regulations be  revised,  based on  new  scientific
information, to supplant the transitional Interim regulations and provide compre-
hensive safety standards.  This requirement  presents  the opportunity to streamline
current regulations, establish  more flexible  monitoring procedures,  and minimize
the need for legal  variances and exemptions.   All  of this is to the  benefit  of
the States,  consumers,  and  water  suppliers, while continuing  to  protect  the
public health.

     The national  regulations  contain health  standards  in  the form  of  maximum
contaminant  levels (MCLs) along with monitoring  and analytical  requirements.   The
program office  reviews the latest  scientific information  to thoroughly evaluate
health risks for specific contaminants, treatment technology, and costs to support
setting the  MCLs.   These Federal  standards  are  designed to provide  the  minimum
level of protection, allowing  States to  establish  more  stringent  requirements if
they so  choose.  The  Office  of  Research  and  Development  (ORD)  supports  this
standard setting  for  new and  revised  MCLs by developing and  providing  toxico-
logical information about  drinking water contaminants  and  by  developing  infor-
mation on treatment and analytical techniques.  The research office also conducts
studies of analytic  methods to assure the  detection and measurement  of  contam-
inants.

     ORD will concentrate,  in  priority order, on  the occurrence and  effects  of
organic contaminants;  Inorganic  contaminants such  as  aluminum,  arsenic,   and
radon; and microbiological contaminants,  including Glardla and Lejionelja.

Develop Standards for Cur rentJ^^JSr^HXl^Av&PJ^-ffllnSPJli

     The promulgation  of hew  standards,  including  those  for  volatile  organic
chemicals, as needed, represents one activity in  developing comprehensive  revised
NPDWR.  These organic  contaminants, many of which  cause  cancer in  laboratory
animals, may leach Into ground  water in the vicinity of hazardous  waste disposal
sites and  other sources.   At high levels,  these  chemicals pose a  substantial
risk to drinking  water supplies.   As  required by  Executive Order 12291  and  the
Safe Drinking Water Act,  a complete  analysis of the economic  impact and regulatory
costs entailed will accompany these new standards.

Promote the Protection of Drinking Water Supplies

    Federal and  State  regulations  apply  to over  64,000 community public water
systems that provide water  to established populations,  as well as to  many  more
systems that provide water to  the public intermittently (such as camp  sites  and
motels).  There may be as many as 150,000 such "non-community"  systems nationwide
that provide water to millions of people  every year.

     Despite the large  numbers of  both  types of  systems  to be  regulated,  high
rates of compliance have been achieved.   In 1980, a full  65S of  community  systems
nationwide complied fully with Federal or  State  microbiological regulations  on a
regular basis.  Ten percent of the nation's community systems were  found exceeding
the microbiological maximum contaminant level, some Intermittently.  The remainder
violated monitoring or other technical  requirements.
                                      DW-5

-------
     As a rule, the njajorlty of systems in noncompliance are small ones,  serving
populations under  3,000.   To  promote compliance, EPA has  drafted a  strategy  in
cooperation with State programs which sets forth a framework to identify problems
and assure maximum feasible compliance.

     New regulations to  protect the public  health from the effects of  organic
contaminants may  pose  a  problem  for many public  water  systems.   The MCL  for
trihalomethanes (THM)  could  involve a   substantial  increase  in technological
complexity for many systems.  Control of THMs, which appear  as a Chemical reaction
to chlorinated water, is critical  because they may be  carcinogenic.

     To respond to this need,  QRD  research on treatment  technologies  for drinking
water will  continue to  provide water  suppliers with  information  on  the  best
treatment techniques for producing safe  drinking water in the most cost-effective
way.  Some of this  research will  be oriented to the needs  of  small  water supply
systems which have  unique technical and  financial  problems.  The detection  and
identification of  organic  contaminants  alone demands  more advanced,  complicated
methods.

     EPA enforces  Primary Drinking  Water Regulations  in  States  that  have  not
been delegated primacy.   This involves  investigating  violations, issuing  legal
variances and exemptions to  systems, and enforcing against  recalcitrant  systems
in these States.

ProvideHealth Advisory Activities

    An ever growing  number of different organic contaminants  are  being detected
in drinking water  supplies, far more than can be practically  regulated.   In the
absence of standards  for these contaminants,  EPA  provides advisory  opinions  to
the States  on  the  health  risk  and treatment  of  particular  contaminants  that
occur locally.  Since 1980, the drinking  water program  has  been  providing  advi-
sory opinions on  particular  chemicals.   ORD contributes  to the development  of
these advisories with toxicological  testing and development of methods to rapidly
assess the health risk of contaminants.

     EPA develops  health  advisories for  specific  contaminants  on  the  basis  of
contamination incidents reported  by State and  local  officials.  The advisories
provide information on contaminants  while  allowing the affected States and systems
to select the best method  of  response to  fit  local  circumstances.  Other Federal
programs (such as RCRA  and Superfund)  which  regulate separate sources   of  toxic
contamination threatening drinking water  sources consult with  the  drinking  water
program on available technical options.

Implement the Underground Injection Control Program

     EPA is concerned about the contamination  of underground  sources of drinking
water.  Such water is the source of  drinking water for  more  than half  the nation's
population.  Contrary to the  conventional wisdom that ground  water  is  naturally
protected from contamination, we have discovered growing numbers  of  incidents  of
chemical contamination,   especially  in  the vicinity  of hazardous  waste  sites.

     Nationwide implementation  of  the Underground  Injection Control program  is
scheduled to  begin  in  1982.   The  program  sets technical   requirements  for  the
construction, operation, and  testing  of injection wells.   Regulatory provisions
for the UIC program have been modified  considerably since  their  promulgation,  by
both the  1980 legislative  amendments  and  the  litigation   settlement  of  1981,

     Section 1425  of the Act, passed in  1980, makes the  requirements  on  State
UIC programs regulating oil and gas operations more flexible and thus encourages
primacy.  Guidance on the implementation of Section 1*25 was developed in conjunc-
tion with the States and published  in the Federal Register on May 19, 1981.   The
settlement, negotiated between EPA and a number of 1ndustry litigants challenging
the UIC regulations, involves  changes to  both technical and procedural  UIC require-
                                      DW-6

-------
merits.  These  changes  allow more flexible  standards  for judging  the mechanical
integrity of  injection  wells,  a  reduction in  routine  monitoring and  reporting
requirements by communities,  and  greater leeway for States to define the extent
of their underground drinking water sources.

     The effect of  the litigation  settlement  Is a lessening  of  the regulatory
burden of  the program  without weakening  the  effectiveness  of the  program  in
protecting ground water.   This trend  will  continue in  1983  with a  "Mid-Course
Evaluation" of regulatory  requirements,  the purpose of  which  is  to  improve  the
effectiveness of the regulations  and identify requirements that may  have proven
unnecessary or which need to be strengthened.

     Delegation of UIC  primacy is  now receiving major emphasis.   State  UIC primacy
is required after two years under the UIC  grant provisions set by the Safe Drinking
Water Act,   By early   1982  EPA  expects to  receive  primacy  applications  from
the eleven States  which together  include  82% of the  nation's  injection wells.
Six of these States (Texas,  Oklahoma, California, Florida, Alabama,  and Nebraska),
constituting 60S  of the  workload,  have already submitted  their  applications.

     The drinking  water enforcement  program will  concentrate  on initiating  a
permitting and enforcement program  for Underground  Injection Control  regulations
in States not assuming program delegation.  It will help States develop enforcement
and permitting provisions to  assume primary enforcement  responsibility  and  will
help the  Regions  implement  a  Federal   program  for jurisdictions not  assuming
responsibility.

     Complementing the  UIC  program,  Section  1424(e)   of the  SOWA provides  for
protection of aquifers that EPA designates as sole or principal sources of drinking
water.  Sole  source aquifers  are  important, because once contaminated,  they  are
difficult to clean up.  EPA  is currently engaged in designations  of  sole source
aquifers: by the end of  the 1982,  there will be as many  as 16  aquifers  designated.
Any project within  the recharge  area of a designated sole  source aquifer receiving
Federal financial  assistance  may  have  those funds denied  if it is determined
that the project poses a significant contamination threat  to a sole source aquifer.

     Since several   EPA  programs  with  separate legislatve  mandates deal  with.
ground water  protection,  EPA has  developed a  research  strategy  within  ORD  to
avoid duplication  in  serving  multiple  programs (SDWA,  RCRA,  and  Superfund),
ORD's work includes  developing methods  to test and monitor ground water pollution,
to determine transport  and  fate of pollutants,  and  to understand  the alteration
of pollutants as they  pass  through the ground.   The  program office will complement
this research by investigating new ways to assess and manage  ground water contam-
ination, addressing, in particular, the  problems  of predicting and  responding
quickly to contamination incidents.  This research  will  provide  technical  infor-
mation needed by EPA,  the  States,  and industry to promote understanding of ground
water pollution and cost-effective methods of pollution control.
                                     DH-7

-------
                              DRINKING WATER


SUMMARY OF INCREASES AND DECREASES
                                                         (in thousands of dollars)
     1982 Drinking Water Program	           $83,831.1

        Salaries and Expenses...	              +246.2

        The marginal increase  in  salaries and  expenses,
        despite a  decline  of  43.9  permanent  workyears,
        represents an allowance for increased operational
        expenses.

        Research and Development..	            -5,113.2

        The decrease reflects  the  elimination  of  lower
        priority control technology research,  Increased
        efficiencies In  the health research  area,  and
        completion of the epidemiology program.

        Abatement, Control  and  Compliance	           -9.214.0

        A reduction  in  extramural  support primarily  re-
        flects the changing nature of the grant programs:
        greater State self-reliance,  simplified adminis-
        trative requirements, reduced regulatory demands,
        and a focus on the most serious problems.

    1983 Drinking Water Program..	....          $69,750.1


SUMMARY OF CHANGES TO JANUARY 1982 BUDGET ESTIMATE

                                                         (in thousands  of dollars)

     January 1982 Estimate	          $91,672.1

        January-March.......	-	.	           -4,006.0

        Reorgani zation.	-,.              -20.0

        Reprogrammi ngs	             -277.0

        Congressional Actions	           -3,566.9

        A decrease  of  $2,527,900 to  Abatement,  Control
        and Compliance   and a  decrease  of  $314,300  to
        Research and Development  were  taken against  the
        March estimate  to reflect  the September 12%
        reduction.  A Congressional  add-on  of  $323,000
        for the  Rural  Water Association  was applied  to
        the Abatement,  Control and  Compliance  appropria-
        tion.  Congress  also restored  $1,290,000 to  the
        Abatement, Control   and  Compliance  appropriation
        for the  Rural Water Association.  An  additional
        reduction of 52,337,700 was  applied  to  the
                                      DW-8

-------
                                                     (in thousands of dollars)
   Salaries and Expenses ($2,134,800), Research
   and Development  ($5,200)  and Abatement,  Control
   and Compliance ($197,700) appropriations to
   meet Congressionally mandated appropriation
   levels.

   Trans fer Author1 ty.......	,	              +28.9

   A net  increase  of  $28,900  was  transferred  to
   this program  as follows:  $2,020,700 was  trans-
   ferred from Research and Development; and
   $2,049,600 was transferred to Salaries and
   Expenses.

Current 1982 Estimate	          $83,831.1
                                 DW-9

-------
                              DRINKING WATER
Program Levels
         Budget    Current
Actual   Estimate  Estimate
1981     1982       1982
                 Increase +
       Estimate  Descrease -
        1983     1983 vs 1982
Number of States with
primary enforcement
responsibility
     PWS                     49
     UIC                      0
Variances fi Exemptions
granted by EPA in non*.
primacy States-PMS

Laboratories certified
PWS non-primacy States
Sole Source Aquifers
designation petitions
reviewed                      3

Sole Source Aquifer
designations                  3
            51
            24
50
37
50
40
8
300
15
60
15
150
15
125
                                            -25
                        10


                         4
          10


           4
                                     DW-10

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
     DRINKING WATER
DHnkltig Water Non-Energy


PROGRAM
Scientific Assessment
Salaries 1 Expenses
Research A Development
Technical Information
& Liaison
Salaries 4 Expenses
Research 4 Development
Monitoring Systems A
Quality Assurance
Salaries * Expenses
Research 8 Development
Health Effects
Salaries * Expenses
Research 8 Development
Environmental
Engineering 8
Technology
Salaries 4 Expenses
Research 8 Development
ACTUAL
1981



$185,0
$7.4
$876.2
$318.0
$2,733.0
$5.555.7
$2,751.0
$7,017.9
JANUARY
ESTIMATE
1982
(DOLLARS IN


$241.1
$14.4
$1,082,7
$735.1
$3,045.1
$8,961.3
$3,274.1
$8,039.6
MARCH
ESTIMATE
1982
THOUSANDS)


$239.6
$14.4
$1,077.4
$720.5
$3,007.6
$8,710.8
$3,254.7
$7 ,728.6
CURRENT
ESTIMATE
1982


$29.5
$191,3
$4.0
$959.7
$482.5
$4,138.9
$6,854.8
$3,217.3
$7,560.6
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982


$84.4 $54.9
$30.5 $30.5
$181.6 -$9.7
$100.0 $96.0
$1,020.5 $60.8
$723.7 $241.2
$3,928.7 -$210.2
$5,198.1 -$1,656.7
$3,153.3 -$64.0
$3,726.4 -$3,834.2

-------
                                             DRINKING WATER

                                        Drinking Water Non-Energy
                                     ACTUAL
                                      1981
             JANUARY
             ESTIMATE
               1982
 MARCH
ESTIMATE
  1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982           1983 VS 1982
Envl ronmental
Processes 8 Effects
 Salaries ft Expenses
 Research ft Development

TOTAL:
 Salaries & Expenses
 Research ft Development

Drinking Mater Mon-    TOTAL
Energy

PERMANENT FULL-TIME HORKYEARS
                                             (DOLLARS IN THOUSANDS)
   $818.7   $1,296.1   $1,221.7   $1,245.3   $1,078.7   -$166.6
 $1,588.5   $3,737.4   $3,737.4   $3,6€9.6   $3,679.6     $10.0
 $7,363.9   $8,939.1   $8,801.0   $9,782.0   $9,447.2   -$334.8
$14,487.5  $21,487.8  $20,911.7  $18,571.5  $13,458.3 -$5,113.2

$21,851.4  $30,426.9  $29,712.7  $28,353.5  $22,905.5 -$5,448.0
Scientific Assessment
Technical Information
ft Liaison
Monitoring Systems S
Quality Assurance
Health Effects
Environmental
Engineering &
Technology

2.7
15.2
48.4
58.2

3.6
17.0
46.0
60.0

3.6
17.0
46.0
60.0

3.6
16.0
44.0
57.0
1.0
2.2
16.1
43.6
47.1
1.0
-1.4
.1
-.4
-9.9

-------
Environmental
Processes & Effects
                                             DRINKING WATER

                                        Drinking Water Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +-
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
Environmental
Processes & Effects
TOTAL PERMANENT WORK YEARS
TOTAL mm YEARS
Scientific Assessment
Technical Information
A Liaison
Monitoring Systems S
Quality Assurance
Health Effects
Environmental
Engineering A
Techno! ogy
18.0 26.5 24.3 23.3 22.3

142.5 153.1 150.9 143.9 132.3

2.0
4.5 5.7 5.7 5.2 4.2

17.3 21.0 21.0 20.0 19.1

69.8 66.9 66.9 64.9 60.5
74.4 81.2 81.2 78.2 59.3


-1 .0

-11.6

2.0
-1.0

-.9

-4.4
-18.9


 19.3
28.7
26.5
25.5
24.5
-1.0
TOTAL WORKYEARS
185.3      203.5
          2D1.3
          193.8      169.6     -24.2

-------
                                DRINKING WATER

                          Drinking Water Non-Energy

Budget Request

     The Agency requests a total of $22,905,500 and 132.3 permanent workyears for
1983, a decrease of $5,448,000  and 11.6 permanent  workyears  from 1982.   Included
in this total is $9,447,200 for Salaries and Expenses and $13,458,300 for Research
and Development, with  a decrease of $334,800 and  $5,113,200 respectively.   This
reduction reflects the completion of  the epidemiology program, Increased efficien-
cies in the  health  research area, and  elimination of lower  priority  technology
research.  Groundwater  research will be  sustained  at the 1982 level and all  nec-
essary support to regulatory work will  be provided.

Program. Description

     The drinking water research program  is a  result of comprehensive coordination
of research efforts with the regulatory program.   This research program is designed
to assist  in the objective  of achieving safe  drinking  water by  supporting  the
Agency's Implementation of the  Safe  Drinking  Water Act  (SDWA) and  by pursuing  a
broad groundwater  research  plan  which  will  provide  the sound  scientific  basis
for EPA's  regulatory   program   covering  several legislative mandates  (such as
SDWA, RCRA, and Superfund).

     This program involves four major activities:   (1)  Research on the occurrence
and health effects of  drinking water contaminants  continues to be  a priority so
that the  regulatory   office can  promulgate  revised  national  primary  drinking
water regulations.   The regulatory  office also  uses this health  Information to
assist jurisdictions in responding to localized contamination problems not covered
by national regulations.

     (2)  Since  groundwater  1s the  source of drinking  water for more  than  half
the nation, the problem of groundwater contamination was addressed  in ORD's  1981
groundwater research plan.  This centralized effort, which  researches  all  phases
of groundwater pollution, will  provide the scientific basis  necessary to  support
any present or  future  recommendations  relating  to  EPA's  statutory mandates.   The
bulk of  this  work is  concentrated in  Environmental  Processes  and  Effects.

     (3)  Environmental Engineering and Technology research  describes changes in
treatment processes or develops new treatment technologies which  reduce  contami-
nant levels In water.   This research  1s used  by  the EPA to evaluate the  technical
feasibility of  meeting possible,  proposed  and  existing  contaminant  standards
under Section 1412 of the SDWA and  to evaluate variances  and  exemptions  under
Sections 1415 and 1416.  This research is also  used to assist States  in assuming
primacy and help localities and water supply  systems achieve  safe drinking  water
in the most cost-effective manner.

     (4)  The  monitoring  systems  and  quality  assurance  program  provides  the
Agency, States,  municipalities,  and  operators  of drinking  water  systems  with
technically and  economically feasible  analytical  procedures  to  monitor drinking
water contaminants.

SCIENTIFIC ASSESSMENT

1981Accomplishments                        :

     In 1981, the Agency did not obligate funds  for this  program.
                                     DW-14

-------
1982 Explanation of Changes from January Budget Estimate

                       January        March        Current
                       Estimate      Estimate      Estimate

                                                   $29,500

     The net Increase of +$29,500 results from two actions, as follows:

     •   Deprogramming.  (+$29,500)  A reprogrammlng of +540,000 was to  support
     work on Maximum  Contaminant Level  (MCI)  criteria needed  by  the Office  of
     Drinking Water, as  well  as to  provide  resources for  scientific assessment
     activities.  A second  reprogrammlng at -$10,500 provided  resources  for  the
     transfer of the accountability function to the  Office  of Management  Systems
     and Evaluation.   (These  two  reprogramnrfngs  were  Included In  a letter  to
     Congress of December 16,  1981.)

1982Pnagrani

     In 1982 the Agency  1s  allocating  a total  of  $29,500 and  no  permanent
workyears to  this  program,  all  of  which  1s  for  the  Salaries  and  Expenses
appropriation.

    The program  reviews  health assessments performed  by  the Office of Drinking
Mater and provides  support  for development of  guidance documents  for  emergency
response to  localized  contamination problems.   Because of the wide experience
of the scientific assessment program In  health  evaluations,  this effort provides
peer review and ensures Agency consistency.  Carcinogenic and other  human  chronic
toxlcity evaluations receive primary attention.

1983 Program Request

     The Agency  requests a total of $114,900 and  1.0 permanent  workyear for this
program, of  which $84,400 is  for  the  Salaries  and Expenses appropriation  and
$30,500 1s  for  the  Research  and  Development  appropriation.   This  reflects  an
Increase of $54,900 and $30,500  respectively,  which will  result in expanded  ORD
health assessment support to the Office of Drinking Mater.

     In order to  Improve scientific  quality  of risk assessment, ORD will   review
assessments prepared  by  the  program office  and  consult  with that office   on
development of methodologies for assessing health  risks.   The Scientific  Assess-
ment program will provide consultation  for the preparation of  the Agency  multi-
media exposure documents  which will  serve the  Office of Drinking Water and other
program offices.   Special   health   assessments  may  be  provided to  supplement
those assessments prepared  by  the Office of Drinking Water.

TECHNICAlINFORMATION AND LIAI SON

     Refer to  the  Oxidants  Non-Energy  narrative  for a   description  of  those
Technical Information and Liaison  activities  which  are common  to  all  research
and development  budget  sub-activities.   Activities  specific  to   this   budget
sub-activity are described below.

1981 Accomplishments

     In 1981, the Agency  used a  total   of  il92,400 for  this program,  of  which
$185,000 was for the  Salaries  and  Expenses  appropriation  and $7,400 was  for
extramural  purposes  under the  Research  and Development appropriation.
                                     DH-15

-------
     The major  accomplishments included providing logistic  support  to  an Inter-
national Symposium  on  Health  Effects  of  Drinking  Water,  Disinfectants  and
Disinfectant By-Products,  holding  a laboratory certification  workshop,  and pub-
lishing a manual of Groundwater Quality Sampling Procedures.

1982 Expl anati. on of Chajiffiesifroin_ January Budget Estimate

                       January        March        Current
                       Estimate      Estimate      Estimate

                       $255,500      $254,000      $195,300

     The net  decrease  of -$60,200  results  from  several  actions,  as  follows:

     -   January - March.  (-$1,500)  This change represented a decrease of
     $1,500 from the January budget, all of  which  was for Salaries and  Expenses.

         Congressional Actions.  (-$58,700)  An additional reduction  of  -$58,700
     was applied  to the  Salaries  and  Expenses appropriation  to meet  Congres-
     sional ly mandated appropriation levels.

         Transfer Authority.  (No Change)   The net change applied to this
     activity is made  up  of a decrease of -$10,400 to  Research  and Development
     and an  Increase  of  +$10,400 to  Salaries  and  Expenses  to fund  essential
     operating costs.
     In 1982,  the Agency  is  allocating a  total  of $195,300 and 3.6  permanent
workyears to  this program,  of which  $191,300 is for  Salaries  and Expenses  and
$4,000 is  for extramural  purposes under the  Research-  and  Development appropria-
tion.

     The Agency  will  continue  to publish  research  findings  and conduct  other
activities in order to transmit technical  information.

1983 Program Request

     The Agency  requests  a total  of $281,600  and  2.2 permanent workyears  for
this program,  of  which $181,600  is  for the  Salaries and  Expenses appropriation
and $100,000  is  for the Research and Development appropriation.  This  reflects
a decrease of  $9,700 and  an Increase of $96,000 respectively, which  will  result
in some shift from in-house to extramural  efforts.

     In 1983, the technical  information and liaison  program will  stress  providing
the necessary technical information to States to assist them in managing drinking
water programs.   One  project  will be  the development  of  a  handbook containing
state-of-the art methods to guide water  systems  operators and  officials  when  a
threat of groundwater contamination from hazardous  waste sites exists.

MOHITORIMG SYSTEMS AND QUALITY ASSURANCE

1981 Accompl 1 shments

     In 1981, the  Agency used a total   of  $1,194,200 for  this program,  of  which
$876,200 was for the Salaries  and Expenses appropriation.

     This work is  designed  to support monitoring procedures  and  quality  control
requirements under Sections 1401,  1413  and 1442 of the Safe  Drinking Water Act.
In 1981, methods   validation  and  performance evaluations  for EPA,  State,  and
local  laboratories  were  conducted and sampling,  analytical  methodology,   and
quality control guidelines  and manuals  in  support of the Agency's Drinking Water
Program were developed.
                                     DH-16

-------
    Quailty assurance  support  for  the Drinking  Water Laboratory  Certification
Program, required as a part of State primacy for drinking water enforcement,  was
provided, including:   (a)   semiannual  performance  evaluation  studies  of  EPA,
State and local  laboratories  for trace  metals,  nitrates, fluoride,  pesticides,
herbicides, trihaloraethanes, turbidity, and residual  chlorine measurements;
(b) distribution of  10,000  quality  control check samples and radioactive  stan-
dards; and (c)  formal  inter-laboratory methods validation  studies conducted  for
organic compounds in the Safe Drinking Mater Act  regulations.

1982 Explanation of Changes from Jynu&ry  toudyet Estimate

                         January       March        Current
                         Estimate      Estimate      Estimate

                        $1,817,800    $1,797,900     $1,442,200

     The net decrease  of  -$375,600 results from  several actions,  as  follows:

         January - March.  (-$19,900)  This change represented a decrease of
     $19,900 from  the  January  budget,  of which  $5,300 was for  Salaries  and
     Expenses and $14,600 was for Research and  Development.

     -   CongressionalActions.   (-$235,700) A reduction of  $89,000 was  taken
     agai nst the March  estimate reflecting  the  September 12S  reduction to  the
     Research and  Development  appropriation.  This  reduction  results  from  the
     decision to forego  contractual  support for  the development of LASER  fluro-
     sensors.

         An additional  reduction  of -$146,700 was  applied  to  the Salaries  and
     Expenses appropriation to  meet the  Congressionally mandated  appropriation
     levels.

     -  Transfer Authority.  (-$120,000)   The net decrease applied to  this  activ-
     ity Is made up  of a decrease  of  -$149,000  to  Research and  Development  and
     an Increase of +$29,000 to  Salaries and Expenses  for necessary operating
     expenses.

1982 Program

     In 1982, the  Agency 1s allocating a total of $1,442,200 and  16.0 permanent
workyears to this  program,  of which $959,700  is for  Salaries  and Expenses  and
$482,500 is for extramural  purposes  under the Research  and Development
appropriation.

     In 1982, Improved  procedures for measurement  of  radionuclides  in  drinking
water will  be  evaluated,  and  evaluation  of alternate  test  procedures  to  meet
requirements of the  Safe Drinking Mater  Act will be continued.  Quality control
and performance evaluation samples  for the water  supply  laboratory  certification
program will be produced and distributed, and on-site evaluations  of EPA  Regional
laboratories for the Drinking Mater Certification Program will be carried  out.

     To support  the Underground  Injection  Control  (UIC)  program,  reports  on
feasibility of locating abandoned wells  with airborne  and surface  operated  mag-
netometers  and on  the  evaluation  of complex resistivity for mapping  underground
fluid movements from injection  wells will be  developed, as  well  as a report on
the feasibility  of the  combined  use  of  fiber  optics  and  laser technology  to
monitor groundwater quality.
                                     DW-17

-------
 1983 Program Request

     The Agency  requests  a  total  of $1,744,200 and 16.1 permanent  workyears  for
 this program, of which  $1,020,500  is  for the Salaries and  Expenses  appropriation
 and $723,700  is  for the  Research  and Development appropriation.   This  reflects
 an increase of $60,800 and $241,200 respectively, which will result in acceleration
 of the development of sampling procedures  and  equipment for groundwater analysis
 and augmentation of the  development of procedures to document pollutant concentra-
 tion and migration in drinking water sources.

     The monitoring research program will focus on (1)  meeting the need to develop
 Improved and  less  costly  monitoring techniques to support  standards development
 and compliance  and  (2)  supporting  quality assurance   requirements  related  to
 certification of State  laboratories under  State primacy enforcement responsibil-
 ity.

     Evaluation of  alternate test  procedures   to  meet  the  requirements of  the
 Safe Drinking Water  Act will be  continued,  and quality control and performance
 evaluation samples  for  the  water  supply  laboratory  certification  program will
 be produced and  distributed.  ORP will  continue to  perform on-slte  evaluations
 of EPA  Regional   laboratories  in  support of  the Drinking  Mater  Certification
 Program, whereby the Regional laboratories are  responsible  for  certifying quality
 assurance of State laboratories.

     Groundwater program  investigations  will be continued, and  operational  sam-
 pling procedures  for  groundwater analysis will  be demonstrated.   This  supports
 EPA's broad groundwater research plan,  including  research to assist  compliance
 with the UIC  program.   Examples  of this work are the development of feasibility
 reports for location  of abandoned wells  and techniques for mapping underground
 fluid movement.  ORD will continue  to  provide  support to the  Agency's  mandatory
 quality assurance program.

 HEALTH EFFECTS

 1981 Accomplishments

     In 1981,  the Agency  used  a  total   of  $3,288,700  for this  program,  of  which
 $2,733,000 was for  the  Salaries  and  Expenses   appropriation and $5,555,700  was
 for extramural purposes under the Research and  Development  appropriation.

     In 1981,   a   symposium   was  held  on  health effects  of  disinfectants  and
 disinfectant by-products  1n  drinking  water  regarding  the  potential  health pro-
blems resulting  from  drinking water  chlorlnatfon.   This  research  provided  the
 Office of Drinking  Water (ODW)  with  the  most  recent information  on the  health
effects of drinking water chlorination,  which aided the  ODW  In  evaluating  regula-
 tory options based on the health effects of disinfectant byproducts.

     Several  bloassays  to determine  mutagenldty  or cardnogenicity  have been
 applied to drinking water systems.  These bipassays showed a reduction in toxlclty
after the water  had been treated by  granular activated  carbon  filters.  Such
 data are useful  1n  developing treatment guidelines for use by communities that
have high quantities of  organic substances in their source  water.

     Controlled toxicologlcal  studies   1n  pigeons were completed   in  1981  and
showed that water containing high  concentrations of  lead and  cadmium and  low
concentrations of calcium and magnesium  caused higher  Incidences  of high  blood
pressure and  atherosclerosis.    Epidemlologtcal  studies  completed   In   previous
years have shown  an inverse  relationship  between drinking  water  hardness  (caused
by calcium and  magnesium  content)  and  cardiovascular   disease.   This  research
will be  Important  in  EPA's evaluation   of  drinking  water's  contribution   to
cardiovascular diseases  for possible control  under SDWA.
                                     DW-18

-------
     Several waterborne  disease  outbreaks  were  Investigated  for  municipalities
and the  causative agents were Identified.  ORD made  appropriate  recomendatlons,
such as  the  need to  obviate contamination  by   crossconnection  or  to  combine
filtration with disinfection, to alleviate the problems.

     An  epidemic!oglcal study on waterborne giardiasis was conducted In Washington
State, which showed  that giardiasis  in humans is more prevalent than  previously
believed and that drinking water 1s  a  significant vehicle in the transmission  of
the agent.  The results  of this study  will  assist ODW and  water supply  systems
in evaluating the potential risks from this contaminant.

1962^ Explanation  of Changes from January Budget Estimate

                       January        March        Current
                       Estimate      Estimate      Estimate

                     $12,006,400   $11,718,400   $10,993,700

     The net decrease  of -$1,012,700 results  from  several actions, as  follows:

         January-March.  (-$288,000)   This request represented a  decrease  of
     $288,000 from the January budget,  of which  $37,500 was  for  Salaries and
     Expenses and 5250,500 was for Research and Development.

     -   Congressipnal Actions.  (-$724,700)  A reduction of-$225,300 was taken
     against the  March  estimate  reflecting  the  September  125   reduction   to
     Exploratory Research  Grant  in the  Research  and Development appropriation.
     However, the  Office  of  Health Reasearch will  still  meet  or  exceed the
     Congressionally mandated 15% allocation of extramural funds for  exploratory
     research.

         An additional reduction  of -$499,400 was applied  to the Salaries and
     Expenses (-$494,200) and  Research  and Development  (-$5,200)  appropriations
     to meet the Co ng res si onally mandated appropriation levels.

         Transfer Authority.  (No Change)  The net change applied to this
     activity is  made  upof a decrease  of  -$1,625,500 to Research and Develop-
     ment and an  increase of +1,625,500  to  Salaries and  Expenses.  The  reduction
     In Research and Development funds  reflects the decrease of Office  of Health
     Research contributions to the  longterm research program.  The Increase  in
     Salaries and Expenses  will  permit  the purchase of essential  supplies and
     equipment.

1982 Program

     In 1982, the Agency  is allocating  a total of $10,993,700 and 44.0 permanent
workyears to this program, of  which  $4,138,900 is  for Salaries and Expenses and
$6,854,800 is  for extramural  purposes  under the  Research and  Development appro-
priation.

     Research on the effects of organic chemicals  that occur  in drinking water  1s
concentrating on those confounds  for which ODW  will  establish National Primary
Drinking Water  Regulations in  late 1983  or  on  compounds  which  require more
health data to  develop emergency response  to  localized  contamination problems.
Various 1n vivo and 1n  vitro test systems are being used to determine the toxidty
of ODW prTorTfy chemicals"for the following health endpoints:  (1) carcinogenicity/
mu t age ni city; (2)  reproduction/teratogenicity; (3) cardiovascular;  and (4)  neur-
rological effects.  Pharmacoklnetic studies will  provide  a  data base  for use  in
dose assessment and  to  improve  available  extrapolation models.   Toxicological
studies on  disinfectants  and  disinfectant  by-products   are  being  conducted   to
assess their  effects  on metabolism,  reproduction,  various target  organs and
carcinogenicity.  Research on the development of short-term in vivo test methodol-
                                     DW-19

-------
ogles for  estimating  potential  health  risks  from  chemicals  in drinking  water
is being  conducted.   The  results  of this  research  will  partially provide  the
data base  for the establishment  of maximum  contaminant levels  for  several  widely
occurring organic contaminants.

     A number of Inorganic substances  such as metals, nitrates,  radjonuc Tides,
and asbestos, has been  found  in  United  States water supplies  and  is believed to
play a  role in  various diseases.   This section  of the  drinking water  health
research program  is   concerned  with:   (1)   lexicological   studies  to  determine
the effects  of  inorganic   substances  on  cardiovascular  disease,  cancer,  and
development; (2) phanmacokinetics of Inorganic elements or compounds to determine
the significance of exposure to these substances In drinking water; (3) determining
relative doses  to  humans;  and  (4)  determining the occurrence of  selected  non-
regulated substances,  e.g., aluminum  and  asbestos, 1n drinking water.   Data  from
these studies will  be  used  by the Office  of Drinking Water  in developing  new
Maximum Contaminant Levels  (MCL's)  and 1n supporting the revision of the National
Primary Drinking Mater Regulations  in 1983.

     The microbiological program conducts studies in  several States to determine
the number of disease  outbreaks, identify the causative agent and provide technical
assistance to the  communities involved.  Research  1s being conducted  to  develop
better methods to detect and  quantify some  of the more poorly understood  agents
of concern  in  drinking  water,  such  as  viruses,   Giardia,  other  protozoa  and
Legionella.  Reports   on the  occurrence  and  significance  of  Giardia,  viruses,
and algal toxins in drinking  water supplies are being prepared  to  summarize the
present state of knowledge.   Minimum  infective dose studies of  viruses  in human
volunteers are being  conducted to determine the minimum number of  viruses  needed
to cause  infections in  humans.  These  data will be  used by  ODW to  assess  the
regulation for microbiological contaminants.

1983 Program Request

     The Agency requests a  total of $9,126,800 and 43.6 permanent  workyears  for
this program, of which  $3,928,700 is  for  the  Salaries and Expenses  appropriation
and 55,198,100 is for the  Research  and  Development  appropriation.   This  reflects
a decrease  of  $210,200 and  SI,656,700  respectively,  which occurs  as a  result
of (1) completion  of  the epidemiology  program; and  (2)  use of more cost-effec-
tive methods of sampling for drinking water  contaminants.

     In 1983, the drinking  water health  effects research program reflects Improved
linkage between  Office  of  Drinking Water and  ORD.   This  program will  emphasize
support to  the  revision of  National  Primary  Drinking  Water  Regulations.   This
research will assist  the regulatory  program in developing sound  standards which
are not unduly restrictive.

     this program will  focus  on three  major areas in  priority  order:  organic
contaminants, inorganic contaminants, and microbiological  contaminants  found  in
drinking water.   Research  in  the  organic  contaminants  area  will  address  the
occurrence and related  health effects  of  specific contaminants  that  have  been
identified by the  Office  of  Drinking Water as being  important health  problems
because they have  the potential to cause cancer or  other chronic diseases  and
the least  information is  known  about them.  Very  few  organic contaminants  are
regulated at this time.   Compounds  which have been  identified include chlorinated
phenols,  disinfectants and  disinfectant  by-products, coal tar coatings,  xylene and
nitrobenzene.  Toxicological   tests  will  be  performed  in  animals to predict  the
carcinogenic, reproductive  and  teratogenic  human health  effects resulting  from
consumption of water contaminated with these compounds.  Toxicological evaluations
of complex mixtures of organics extracted  from actual  drinking  water samples  will
be conducted.
                                      DW-20

-------
     Research on  inorganic  contaminants  in  drinking  water will  be  concerned
primarily with cardiovascular  disease,  cancer and developmental  toxicity.   Stud-
dies relating water hardness and waterplpe corrosion  products  to cardiovascular
disease will  continue.   Studies on  the occurrence of  aluminum, believed to  be
related to  Altzheimer's disease  (early senility),  will  be completed.   If  the
occurrence data  warrant,  studies  will  be  conducted  to determine  the level   of
aluminum needed  to  cause the  onset  of  this disease.  This  1s  Important  because
sometimes one of the primary  flocculants  used  in drinking water treatment  1s
aluminum sulfate,  which  disassociates  to  free  aluminum   ions.   As  a  result,
aluminum can be found In significant quantities in some water supplies;
therefore, the Office of  Drinking  Mater has  requested  that  the  hazards of these
chemicals be evaluated.

     Research on  microbiological  contaminants  In drinking  water will  continue
to Investigate  waterborne  outbreaks  of Infectious diseases by  Identifying  the
causative agents,  determining  the  route  of  entry  and recommending  corrective
action.  This  information  is  used  to  develop  water  treatment  technologies
that assure protection against waterborne outbreaks.  An assessment of the under-
reporting of  Infectious  disease outbreaks  will  be  made  on  the basis of EPA's
efforts to improve reporting In three States.   Methodology  to concentrate  Glardla
cysts from water  and determine their viability  will  be completed.   The  minimum
infectious dose of a second  virus  will  be  determined.   This  study will take Into
account factors  that might Influence the Infective response.

ENVIRONMENTAL ENGINEERING AMD TECHNOLOGY

1981 Accomplishments

     In 1981, the Agency  used  a total  of  $9,768,900  for  this program, of which
S2, 751, 000 was for the Salaries and Expenses appropriation  and $7,017,900 was  for
extramural purposes under the Research and Development appropriation.

     Activities  in this program satisfy the requirement that the Agency Identify
treatment technology which  water  utilities  can use  to achieve  compliance with
drinking water regulations and which  the Agency  can use to evaluate requests  for
variances and exemptions (Sections  1415,  1416 and and 1412  of  the  Safe Drinking
Water Act).
     In 1981, a  report  was published  on treatment  techniques  for  controlling
tri hal omethanes  In drinking water.   A field study of 36 package  water treatment
plants was  completed,  which showed  that  the package  plants could  economically
meet the traditional standards for turbidity  and  bacterial  quality  If properly
operated and maintained.  Two  technologies related to control  of asbestos  fibers
In drinking waters were developed,  both of which resulted In considerable cost-
savings.  A number  of reports  were  published  on the removal or inactivation  of
Glardla 1 ambl la   cysts   by  water treatment  processes.  G1ard1as1s,  a  protozoan
dTsease, 'has' "Ween a  more  common waterborne disease in the United States  for  the
last several  years.

1982 Explanation of Changes from January Budget Estimate

                      January         March        Current
                      Estimate      Estimate       Estimate

                     $11,313,700   $10,983,300   $10,777,900

     The net  decrease  of -$535,800 results  from several   actions,  as  follows:

                , " Mai"ch.  (-$330,400)  This change represented  a decrease  of
             .,
     $330,400 from the  January budget*  of  which  $19,400 was  for Salaries  and
     Expenses and $311,000 was for Research and Development.
                                     DW-21

-------
     -   Congressional Actions.  (-$325,400)  A reduction of -$325,400 was
     applied to the  Salaries  and Expenses appropriation to meet  Congresslonally
     mandated appropriation levels.

         Transfer Authority.  (+$120,000)  The net change applied  to this
     Research and Developnient activity  is  made up of a  decrease  of -$168,000 to
     Research and  Development and  an  Increase  of +$288,000  to  Salaries  and
     Expenses.  The  Increase  trill  be  used  to  continue the  transportation  of
     potable water for  pilot  plant activities, to  purchase supplies  for  micro-
     biological work, and  to   Insure  the availability  of  funds  to  support  the
     travel celling  for  monitoring  extramural projects.  This  will  also  permit
     us to  meet  Increasing  1982  requirements  for  rents,  communications  and
     utilities.  The  Office of Administration has  assigned more facility  costs
     to the ORO laboratories.

        The remainder of Salaries and Expenses Increase will support the reloca-
     tion of an employee; a printer for a word processor; the  printing of user's
     manuals; and for equipment  replacement  as well as allow ORO to conduct lab
     program reviews, monitor  extramural  projects  and  also  conduct more program
     evaluation studies.

1982 Program

    In 1982, the  Agency  is allocating  a total of $10,777,900 and 57.0 permanent
workyears to this program,  of which $3,217,300 1s for Salaries and Expenses  and
37,560,600 is  for extramural  purposes  under the Research and Development  appro-
priation.

    The research  will  continue  to  support  development of  assessment of  the
technological feasibility  of  meeting drinking water standards and  assistance  to
water supply systems in meeting standards.

     A major effort  of  the program  deals  with  evaluating  treatment technology
for removal  of organic  contaminants in  support  of regulatory decisions  in  this
area.  Projects dealing with removal  of contaminants from groundwater by aeration
and adsorption, investigations of byproducts  of  the reactions of  disinfectants
with aquatic  humic  materials, and  reports  on  organic  contaminant removal  by
granular activated carbon  will be conducted and produced.  Another major  effort
will be development and evaluation of treatment technology for removal of inorganic
contaminants, for which  a  number of Interim standards are  currently  1n effect.
Development of economical treatment methods with emphasis on nitrates,  flouride,
and arsenic removal  will  be continued.

    Also, the program will continue research  on maintaining water quality in  the
distribution systems  including studies related to deterioration and rehabilitation
of distribution systems and problems of corrosion of distribution pipes and house-
hold plumbing.  Projects  related  to  microbiological  contaminant  control  will
include studies on the use of unit processes  other  than  disinfection  for control
of viruses and  bacteria  and studies on  methods  to reduce  trihalomethanes  while
maintaining microbial quality.   Work  will  conlnue  on  the control  of  Giardia  by
treatment processes.   Finally, studies to develop engineering and cost data  will
be continued Including the use of package treatment plants  by small  communities,
alternative approaches for  dealing  with management and  cost  problems  of  small
systems, and the economic effects of drinking water regulations on water utilities.
                                     DH-22

-------
1983 Program Request

     The Agency  requests  a total  of $6,879,700 and 47.1 permanent  workyears  for
this program,  of which  $3,153,300  1s  for Salaries  and Expenses  appropriation
and $3,726,400 1s  for the Research  and Development appropriation.   This  reflects
a decrease of  $64,000 and $3,834,200 respectively, which will result  in  across-
the-board reductions, primarily In the following areas:  (1)  development of treat-
ment cost data;  (2) microbiological  controls;  and (3)  control  of  Inorganics.   The
work to  be  reduced trill  be lower priority or  work  which  could be performed by
the private sector  or other Federal  agencies.   The reduction also  reflects com-
pletion of  some  projects  in the  microbiological  and  Inorganic  treatment areas.
The program will  continue to emphasize control  of organic contaminants  in line
with the Office  of Drinking Water  priorities.   The program will focus  on  eval-
uating the  technological  feasibility  of  achieving  safe  drinking   water levels
In order to  support EPA and State regulatory decision-making, and  on  efforts to
meet drinking water standards.

     Research will  emphasize  treatment  technologies  which  will  control  contani-
nants found in three categories in priority order:  organlcs,  inorganics
(including asbestos),  and microbiological.   Work  on  viruses,  protozoan  cysts,
natural radionuclides  and corrosion 1s included 1n  these  categories.   For each
of these categories,  special  attention  is  given to the  cost of treatment and  the
needs of small systems.

     Synthetic organlcs  have  been  found  in a  large  number  of  water  supplies,
particularly in  underground  sources.   States  have  moved to establish  guidelines
and EPA  is  moving  toward  a  standard  for  chlorinated   solvents  that have been
found 1n underground  drinking  water sources.   Promising control  methods  need to
be evaluated and the  results reported to the water supply  Industry.   Studies on
control of organic contaminants In drinking water from ground  and surface sources
will be  conducted  and reports Issued.  Improved analytical methods for  prganics
will be developed and evaluated.

     Work will focus  on  combinations  of  Inorganics of  health  concern  found in
water supplies and on the species of inorganics. There  are  a  number of inorganic
contaminants of  health concern  including  nitrates,  metals,  radionuclides,  and
asbestos.  Both health effects and treatment technology  requirements change with
different species (valence states).   Age and corrosiveness  of  water  cause deteri-
oration of distribution  systems, and  the  effects  of corrosion  in  distribution
systems (asbestos, cement, and metal) on drinking water  quality will be assessed.
Studies on the control  of  Inorganic contaminants in  drinking water will be conduct-
ed and reports issued.  Improved analytical methods for  inorganics will be devel-
oped and evaluated.

     Microbiological contamination  will continue  to be a  concern.   According
to recent data, 180 waterborne disease outbreaks involving  50,000 people  occurred
from 1976 through  1980.   As  treatment  methods change,   the microbial  population
may penetrate  deeper  into the treatment system.   Since waterborne  disease out-
breaks still  occur  in this country,  some  work is  needed to  assure that biocide
efficiency 1s  maintained  throughout the treatment system  and that regrpwth  in
the distribution system does not  occur.  Work  will be continued  on  the microbio-
logical effects  of  treatment  processes  and on the  microbiological  quality   of
water In the distribution system.

ENVIRONMEKTALPROCESSESAND EFFECTS      ;

1981 Accomplishments

     In 1981, the Agency  used a total  of  $2,407,200  for this program, of  which
$818,700 was  for the  Salaries  and Expenses  appropriation  and  $1,588,500  was
for extramural purposes under the Research  and Development  appropriation.
                                     DW-23

-------
     In 1981, a  plan for  groundwater  research  was published and  transmitted  to
Congress which sets  out  the  objectives  of the Agency's groundwater research  (in
Drinking Hater as well as other programs, including Hazardous Waste), and describes
the research activities which promote our  understanding of groundwater  and support
the Agency's role  in protecting  it.  A  manual was  prepared describing  the  state-
of-the-art of groundwater  sampling  practices.   Research 1s necessary  to  develop
appropriate technology for conducting   sophisticated  investigations  of the sub-
surface environment.  Practices  will be recommended depending  on  the nature  of
the investigation.  A summary was prepared of the status of knowledge  of behavior
of groundwater  contaminants  during  recharge.    This  Information  will  be used
in identifying  combinations  of circumstances most likely to produce  groundwater
quality problems.

     In addition, a  report was prepared describing the applications  and  limita-
tions of  three  techniques  for estimating  the  transport  of  organic  pollutants
through soil to  groundwater.   The information is  for use by  EPA  and State  and
local  agencies  Involved  in  the assessment  of  groundwater  pollution  potential
from the use, handling, and disposal  of organic  chemicals.  A film was published
and made available  which  describes  the  relatively  recent technology required  to
collect and analyze  groundwater  samples for  organic chemical contamination.   The
basic concepts for  construction  of  monitoring  wells,  collection of samples, and
laboratory analytical procedures  are described  to  give  managers  of  groundwater
protection programs an appreciation  of  the  cost  and complexity of the  problems.

1982 Explanation of Changes from January Budget Estimate

                       January       March         Current
                       Estimate      Estimate      Estimate

                      $5,033,500    $4,959.100    $4.914,900

     The net decrease  of  -$118,600  results from  several actions,  as  follows:

         January -March.  (-$74,400)  This  change  represented a  decrease  of
     $74,400 from the January  budget, all  of which $74,400 was  for Salaries  and
     Expenses.  This decrease  resulted  in  a decrease in  research on  transport
     and fate of pollutants In ground water.

     -   Congressional  Actions.  (-$44,200)   An additional  reduction of -$44,200
     was applied  to the Salaries  and  Expenses  appropriation to  meet  Congres-
     sional 1y mandated  appropriation  levels.

     "   Transfer Authority.   (No Change)  The  net  change  applied to this
     activ1 ty is made up  of a decrease  of  -$67,800 to Research and  Development
     and an increase of  +$67,800 to  Salaries and Expenses.  The  Hal comb Research
     Institute's proposal  is  $30,000  less  than original cost estimates  so  there  1s
     no effect  on  the project.   One cooperative  agreement  will  be  step-funded
     for the remaining $37,800.

     The Increase will permit  stronger  response  to technical  assistance  requests
     through additional travel  funds; permit the transportation of household goods
     needed for  refilling  vacancies; peraiit maintenance of  several   scientific
     Instruments critical   to  planned work;   and  purchase  laboratory supplies  to
     keep analytical workload at planned levels.

19B2 Plan

     In 1982, the Agency  is  allocating  a total  of $4,914,900 and  23.3 permanent
workyears to this program, of  which  $1,245,300 is  for Salaries  and Expenses and
$3,669,600 1s for  extramural  purposes  under the  Research and Development  appro-
priation.
                                     DW-24

-------
     In order  to  provide  the  scientific  bases  for  regulatory  and  management
decisions on the  protection  of underground  sources  of drinking water,  research
is  focusing  in the following  four  areas:   (1) improved methods  for determining
the transport  and  transformation  of contaminants  in the subsurface;  (2)  methods
for predicting the  behavior  of pollutants in aquifers  based  on  subsurface (site-
specific) characteristics and  on  characteristics  of  the  pollutants;  (3)  data  for
regulatory and management decisions on control  of  specific  sources of underground
water pollution; and (4) evaluation of water source  in situ  reclamation  methods.
Additional resources  in Hazardous  Waste  allow specific outputs  to be  produced
in support of  the  Resource  Conservation  and Recovery  Act in model  development
and field evaluations  to predict pollutant  plumes In  underground water  sources.

     In methods development, a manual  for sampling of  underground water  has been
published, but  the subsurface environment continues to  be difficult  to  access,
and the  results of sampling  remain  difficult to  Interpret In  predicting  the
transport and transformation of contaminants.  In  1982, indicators of underground
water contamination will be selected and  evaluated.

     Currently, in  transport  and  transformation,  the  behavior  of  twenty   or
so organic chemicals  In a few  subsurface environments has been determined,  but
with numerous  chemicals of  concern and many  soil types, the subject  has barely
been explored.  The findings do  indicate, however,  that  we  will  ultimately  be
able to determine a few characteristics of concern both for chemical  contaminants
and soil type which will allow the prediction  of the Impact of classes of chemicals
in various subsurface  water  environments.  Also of importance is the  behavior of
microbiological contaminants, especially viruses, which  is also being addressed
in this program.

     A number of sources of underground water pollution is  being  studied  in terms
of the Impact  on  underground water supplies.  Manuals which describe  management
practices for safe  Injection of treated wastewater and determination  of appropri-
ate septic tank density (In cooperation with the  small wastewater  flows  research
program) are being prepared.

     With the  Increasing  number of Incidents  of  pollution of underground water
supplies seriously  threatening  public drinking water  supplies,  the  groundwater
research program will  begin Investigating the economic and technological feasibil-
ity of  cleaning up polluted  underground  water sources 1 n situ.   There may  be
locations where this  will  be  more  cost-effective than treatment or  development
of alternate drinking  water  supplies.  In this first year (1982), the  efficacy
of practices tried  in  the  past will  be determined.   This  research will  provide
needed Information both  for  the  Agency and local  governments to deal  with under-
ground water pollution problems.

1983Program Request

     The Agency requests a  total  of $4,758,300 and 22.3 permanent workyears  for
this program, of which  $1,078,700 is  for the  Salaries  and  Expenses appropriation
and 53,679,600 is  for  the  Research  and Development appropriation.  This  reflects
a decrease of $166,600 and an Increase of  $10,000  respectively, which  will  result
In slight reductions in evaluation of reclamation processes  and long-range studies
on transport and transformation.

     In 1983, research  for the  five-year groundwater research plan will  proceed.
The purpose of  this work is to  provide a sound scientific basis for any  regulatory
action to protect groundwater.   This will provide  information needed by the States
as they assume the  greater environmental  responsibilities  for  drinking water
protection.   EPA will use this information to  support  the Implementation of several
programs,  including sole  source  aquifer protection  and  underground Injection
control.
                                     DW-25

-------
     In methods  development,  work  will  begin  to  develop methods  for measuring
the subsurface  characteristics,  such  as  redox  potential   and  ionic  strength,
which are likely to influence transport and transformation of chemicals in under-
ground water supplies.  Probes  or other  surface water methods will  be tested to
determine whether  they  accurately  measure transport  and fate  parameters  under
the anaerobic conditions normally found in aquifers.

     In order to improve predictive ability for the behavior of pollutants 1n the
subsurface, research will determine the degradation  and  sorption characteristics
of several classes of organic chemicals and continue the determination of the type
and numbers  of  microorganisms   in  various  subsurface  environments that  could
influence biodegradation.  A  shift from  source characterization will  allow the
transport and fate characteristics  of  several  additional  classes of chemicals to
be determined  and  the  hydrologlc and chemical  characteristics of  the subsurface
to be addressed.

     The research, requested  by the Office of Drinking Water, to develop methods
for determining  the  mechanical   integrity  of  injection   wells  will  continue  in
1983.  Additional  work  supported under Hazardous  Waste  will produce outputs In
model development,  field evaluations,  and  classification  of  environments  in
terms of their  relative  vulnerability  to  pollution  of  underground  water supplies
from mismanaged land disposal  of hazardous wastes.
                                      DU-26

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                                                DRINKING HATER

                                               Drinking Water Criteria, Standards t Guidelines

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                                         1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE -
                                                                    1982        1982        1982            1983 VS 1982

                                                                (DOLLARS IN  THOUSANDS)
                   PROGRAM
i
Standards ft
Regulations
Devel opment
 Salaries 8 Expenses
 Abatement Control ft
 Compl 1 ance

State Program
Guidelines &
Regulations
Development
  Salaries & Expenses

TOTAL:
 Salaries 4 Expenses
 Abatement Control &
 Compliance

Drinking Water         TOTAL
Criteria, Standards &
Guidelines

PERMANENT FULL-TIME WORKYEARS
$5,016.6   $6,038.3   $5,619.0   $5,009.8   $5,540.0
$3,642.4   $3,827.8   $3,594.6   $2,391.5   $2,675.7
                                                         $11.3
                                                      $5,027.9    $6,038.3    $5,619.0   $5,009.8   $5,540.0
                                                      $3,642.4    $3,827.8    $3,594.6   $2,391.5   $2,675.7
                              $530.2
                              $284.2
                                                        $530.2
                                                        $284.2
                                                      $8.670.3    $9,866.1    $9,213.6   $7,401.3   $8,215.7    $814.4
                   Standards 4
                   Regulations
                   Development
                                       94.1
              109.3
96.3
91.8
87.2
-4.6

-------
I
ro
CO
                                                               miNKING WATER

                                              Drinking Water Criteria, Standards 8 Guidelines

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981     ESTIMATE   ESTIHATE   ESTIMATE    1983   DECREASE -
                                                                   1982       1982       1982            1983 VS 1982
                  State Program                            .4
                  Guidelines 8
                  Regulations
                  Devel opment

                  TOTAL PERMANENT WORKYEARS              94.5      109.3       96.3       91.8       87.2      -4.6

                  TOTAL WORKYEARS
                  Standards 8                           115.6      127.6      114.6      111.1      102.2      -8.9
                  Regulations
                  Development

                  State Program                            .4
                  Guidelines &
                  Regulations
                  Devel opraent

                  TOTAL HORKYEARS                       116.0      127.6      114.6      111.1      102.2      -8.9

-------
                                  DRINKING WATER

                        Criteria, Standards and Guidelines

Budget Request

     The Agency  requests  a total of $8,215,700  and 87.2 permanent workyears  in
1983, an increase  of $814,400 and a decrease of 4.6 permanent  workyears  from the
current 1982 estimate.   Of the total,  $5,540,000 is for Salaries and Expenses and
$2,675,700 is for Abatement, Control  and Compliance.

     The criteria,  standards and  guidelines  program  will   revise  the  National
Primary Drinking Water  Regulations (NPDWR), maintain a  national  capacity  to regu-
late public water  systems,  and  implement  the Underground  Injection  Control (UIC)
and sole source  aquifer  programs.   The revised NPDWR  will  be  proposed  to amend
the current interim  regulations after  careful  analysis  of  the best  scientific
findings, potential regulatory  impacts,  and the  effectiveness  of  current regu-
latory requirements.  These  new  regulations  will  improve protection by  covering
more contaminants,  while  reducing the  State  and local  regulatory burden  with
streamlined, more flexible Federal  requirements.

Program Description

     Criteria, standards and guidelines includes the entire Headquarters component
of the drinking water program.   The national  program is responsible  for 1)  devel-
oping drinking water standards,  encompassing risk assessments,  technology  evalu-
ation, and  economic  impact  analyses  along  with  preparing  the regulations;  2)
implementing and managing the public  water systems supervision and ground water
protection programs, including regulation modifications, grants allocation, guid-
ance development,  and  analysis  of national  compliance  data;   3)  assisting  in
emergency conditions which  threaten drinking water supplies  and sources;  and  4)
supporting data  management.  In  addition, the  program  maintains  a  laboratory
capability to analyze  specific  contaminants  and their  prevalence and  to support
the preparation  of drinking water standards, where appropriate.  The  laboratory
also provides information to the Regions and  States in dealing with  spills and
incidents of detected contamination.  •

CRITERIA. STANDARDS AND GUIDELINES

1981Accomplishments

     During 1981,  the  Agency obligated  $8,659,000.   Of  that   amount  $5,016,600
was for  Salaries  and  Expenses   and  $3,642,400 was  for  Abatement,  Control and
Compliance.  Program accomplishments  were in three general areas.

     1)   Development and Revision of Standards and Regulations:  Development and
revision of primary drinking water standards (NPDWR) to protect against  new con-
taminants and to assure that present  standards reflect latest  research  findings
continued through  1981.    Work   concentrated   on  developing  standards  (Maximum
Contaminant Levels or MCLs)  for  particular volatile organic  chemicals  frequently
encountered in  ground  water.  When  promulgated,  these MCLs will  represent one
part of the comprehensive Revised NPDWR's.  An intrinsic part of the standard-
setting effort is  the  analysis  of regulatory  costs and the economic  impact,  as
required by the  SDWA.   Another  activity  was  the development  of  procedures  to
assess the toxicological  potential  of drinking  water additives before the  issuance
of advisory opinions to  State  agencies.   This  involved investigation  and  review
of contaminant occurrence and health effects,  and the  development of monitoring,
measurement, and control  methods.

     2)   Management of the National  Regulatory Programs:   In managing  the  Public
Water System and Underground Injection Control programs, Headquarters coordinates,
guides, and provides   support  to  States  and  Regions   with  primary enforcement
responsibilities.  In 1981,  EPA  issued a  formal   guidance outlining a  consistent
                                     DW-29

-------
strategy to increase the  compliance of small systems with  national  regulations,
and prepared a  number of  guidance  documents for  implementing the UIC  program.
Headquarters reviews petitions  to designate sole  source aquifers under  Section
1424(e) of the  SDWA and  reviews requests  for variances  and  exemptions to  PWS
requirements to ensure proper adherence to  statutory  requirements.  EPA  reviewed
three sole source aquifer  petitions  in  1981.   Other activities included  managing
State grant allocations, maintaining  data  systems  for  PWS  reporting,  developing
a data  system  for  the UIC  program, and  planning  and administrative  support.

     3)   Advisory Health Information and  Technical Assistance:     EPA  prepared
eight health advisory  documents  to  inform  State  authorities and water  facility
operators about  the  estimated  health  risk  posed  by unfamiliar contaminants.
These are strictly  advisory  guidance, including,  where  appropriate, the  level  of
human exposure  which  available  scientific  information indicates will  pose  no
health hazard.   They  contain  relevant  toxicological   information,  as  well   as
information on how  these  contaminants can be monitored  and  effectively  removed.
EPA also provides laboratory and  analytic capacity, maintained to support  develop-
ment of standards,  to  assist State  and local governments.   EPA  lends  assistance
in emergency  situations  as  well,  where  contaminants  are  found that  pose  an
acute health hazard either 1n water supplies or sources.

     The Agency  used  extramural  funds  to  support  the  following  activities:
collecting  the  latest  toxicological  information   on   selected   contaminants;
preparing technical   guidance for implementation  of the UIC program;  collecting
and compiling  data   on human  exposure  to  water-borne  contaminants  to  support
determination of primary standards (some of this  will be in  conjunction  with  EPA
surveys of national   contaminant  occurrence); collecting information  on treatment
process performance   and  cost;  and   assessing  the  financial   conditions  of  the
nation's water supply industry.

1982 Explanation of Changes from January Budget Estimate

                   January         March         Current
                   Estimate       Estimate       Estimate

                  $9,866,100     $9,213,600    $7,401,300

   The net decrease of -$2,464,800  results from  several  actions,  as  follows:

       January  -   March.    (-$652,500)   The change  represented  a  decrease of
   $652,500 fromthe January request,  of  which  $419,300 was  for Salaries  and
   Expenses and $233,200 was for Abatement, Control and Compliance.   Promulgation
   of protocols for  evaluating additives  and the  subsequent issuance  of toxico-
   logical opinions  were  delayed.   Proposal of  Revised  Primary Drinking  Water
   Regulations was delayed until  early 1983.

       Reprograniriiings.  (+$60,000)  During the  development of the operating  plan,
   severa1 mi scellaneous reprogrammings,  which are not reportable to  Congress,
   were made  to  this  activity  and  resulted   in  a  net increase  of +$60,000.

       Congressional ActIons.  (-$1,872,300) A  reduction of-$1,005,400 was  taken
   against the March estimate, reflecting the September 12%  reduction to the Abate-
   ment, Control  and Compliance appropriation.   Contracts to support revisions to
   the primary drinking water regulations1 and  support  for  regulation  development
   will be reduced.   In  addition,   the  Office  of Drinking Water's  management
   support for the underground injection control and public water system  programs
   will be reduced.

       An additional reduction of -$866,900 was applied to  the  Salaries  and  Ex-
   penses ($669,200) and Abatement,  Control and  Compliance  ($197,700)  appropri-
   ations to meet Congressionally mandated appropriation levels.
                                     DW-30

-------
1982Program

     The Agency  is currently  allocating  for  this program  $7,401,300  and  91.8
permanent workyears,  of  which  $5,009,800  is  for  Salaries  and  Expenses  and
32,391,500 is for Abatement, Control  and Compliance.  Activities  include:

     1)   Development and Revision of Standards and Regulations:    EPA is  issuing
two Advance Notices of  Proposed  Rule Making in  1982 for  comprehensive review and
revision of existing primary drinking  water standards.  This  involves  assessing
the latest  research information  on contaminant  health effects  and waterborne
occurrence.as  well  as  the  effectiveness,  efficiency,  and  necessity of  current
monitoring and reporting  requirements.   As mandated  by  the SOWA, these  Revised
National Primary  Drinking  Water  Regulations  provide  for  comprehensive  human
health protection from  potentially harmful  contaminants  and will  entail  stream-
lined regulatory requirements to  reduce the  administrative burden on States  and
utilities.  This review of existing regulations is one  part of  developing  compre-
hensive Revised NPDWRs.   The other activity  involves  examining the need  for  new
standards for volatile  organic contaminants.   All  revisions  involve  systematic
regulatory impact  analyses.   In  1982, major  surveys   of  contaminant  occurrence
in ground water  sources  are  being completed  by  EPA.   The Agency has deferred
development of advisory opinions  for drinking  water additives.

     2)   Management of the National  Regulatory Programs:   Major  emphasis  in 1982
is on  issuing  guidance documents  for  UIC program implementation stemming  from
changes in the program  regulations.  Documents  either  describe changes in  regu-
latory provisions or clarify technical  or  procedural  details,  as  agreed  upon in
the 1981  litigation  settlement.    A  guidance  document stemming  from a proposed
settlement of the  litigation  of  MCL's for trihalomethanes  will  also be  issued.
Review of State  UIC  primacy applications  is another critical  task,   Compilation
and analysis  of  State  compliance  data,  management of State  grant  allocations,
and administrative support continues.

     3)   Advisory Health Information and  Technical Assistance:   The Agency will
develop health advisory documents  for  15  contaminants  in 1982.   In  addition,  we
will prepare  a more systematic  approach  to  emergency response,  setting  up  the
capacity to develop rapid advisory estimates  of the health risk posed by  major
contamination incidents as  they  occur.  Ongoing  technical  assistance to  States
and localities for  the  identification,  assessment, and  control   of  contaminants
is continuing  as needed.   Direct  EPA participation  and  consultation,  such  as
that provided to Tucson, Arizona  in the Fall of 1981, is  available.

     Extramural  funds will  support the following: collecting  the  latest  toxico-
logical data  on  selected  contaminants, preparing  technical  guidance for  imple-
menting the  UIC  program,  collecting  and  compiling  data  on  human  exposure  to
waterborne contaminants to support determination of primary standards, collecting
treatment process performance and  cost  information,  and assessing the  financial
conditions of the nation's water  utility industries.

V983	Prp^ramjegues^t

     The Agency requests  a  total  of  $8,215,700 and 87.2 permanent workyears,  of
which $5,540,000 is  for Salaries  and  Expenses  and $2,675,700  is  for Abatement,
Control and Compliance.   This  represents  an  increase  of $814,400  which provides
funding for  operational  expenses  and  contacts to  further  support regulatory
impact analyses,  and  a  decrease  of  4.6  permanent  workyears  resulting  from  a
reduction of  activity  relating to the  control  of additives  in  drinking  water.
planned activities will  include these major areas:

     1)   Qevelgpmentand Revisions of Standards and  Regulations:.   Promulgation
of new  MCCs for"V51 atl 1 e  Organic Chemicals  (VOCs),if needed,  is planned  in
1983, as are  proposals  revising  existing  standards and regulatory requirements.
The program will  continue to  compile,  assess,  and analyze  the latest  scientific
data, as well  as  analyze the regulatory and economic impact of regulatory require-
                                      DW-31

-------
ments.  The  revised  standards will  streamline national  regulatory  requirements
reducing regulatory  burdens  while maintaining  protection  against  adverse health
effects.  The need to amend the UIC regulations will be determined by a mid-course
evaluation which will take place in 1982 and 1983.

     2)   Managementof the NationalRegulatoryPrograms:   We  will  emphasize
efficient operation ofthe UIC program and prepare cl ear.understandable guidance
to support program implementation.  The program will  rapidly  review applications
for State UIC  delegations as  well  as process  petitions  for  sole  source desig-
nations.  In addition,  efforts  to  characterize  and assess the effect of subsurface
contamination of  drinking  water   supplies  will  continue.    Management  of  the
State grant  allocations,  ADP  systems,  and  on-:going  coordination, support,  and
assessment of Regional  programs  will continue, though  at a lower  level  than in
past years.  The program  will also  issue  implementation guidance  on the  THM
regulations for  systems serving  10,000  to  75,000  people, guidance  on granting
variances and exemptions,  and  guidance  on enforcing compliance  in  recalcitrant
systems.

     3)   Advisory  Health  Information and Technical  Assistance:   Health advi-
sor ies which providerTskinformationan3controltechniques  on  unregulated
contaminants and  general  technical  assistance will  continue to be  developed  for
the use  of  State  agencies  and utilities.   The Science  Advisory Board  will  be
consulted during the development of health advisories.

     Extramural  funds will supplement  in-house expertise  in  gathering the latest
toxicologlcal information on selected  contaminants, human  exposure to waterborne
contaminants, the efficacy  of treatment  processes,  and the  economic  impact  of
drinking water protection.
                                      nw-32

-------
                                                               DRINKING WATER

                                              Drinking Water State Program Resource Assistance

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                         1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                   1982        1982       1982            1983 VS 1982

                                                               {DOLLARS IN THOUSANDS)
                   PROGRAM
to
U)
Public Hater System
Supervision Program
Grants
 Abatement Control 4
 Compliance

Underground Injection
Control Program
Grants
 Abatement Control &
 Compliance

Special Studies &
Demonstrations
 Abatement Control S
 Compliance

Training
 Abatement Control 8
 Compliance

Underground Injection
Control
Implementation
Program
 Abatement Control £
 Compliance
                                                    $30,188.8   $29,450.0  $29,450.0  $29,450.0  $23,560.0 -$5,890.0
                                                     $7,218.7    $8,574.5    $6,574.5   $6,574.5   $5,540.2 -$1,034.3
                                                     $1,530.3    $1,5DO.O    $1,500.0    $1,823.0
                                                       $172.0
-$1,823.0
                                                       $311.7

-------
                                             DRINKING HATER

                            Drinking Water State Program Resource Assistance

                                     ACTUAL    JANUARY     MARCH     CURREMT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982           1983 VS 1982

                                             {DOLLARS IN THOUSANDS)

TOTAL:
 Abatement Control S             $39,421.5  $39,524.5  $37,524.5  $37,847.5  $29,100.2 -$8,747.3
 Compliance

Drinking Water State   TOTAL     $39,421.5  $39,524.5  $37,524.5  $37,847.5  $29,100.2 -$8,747.3
Program Resource
Assistance

-------
                                  DRINKING WATER

                        State Program Resource Assistance

Budget Request

     The Agency requests  a total  of  $29,100,200  in  1983 for Abatement,  Control
and Compliance, a  decrease of $8,747,300  from  the  current 1982  estimate.   This
Includes $23,560,000  for   continuation  of the  Public Water  System  Supervision
grants, and $5,540,200 for continuation  of Underground Injection  Control  grants,
a reduction  of 35,890,000 and  $1,034,300, respectively, from  the current  1982
estimate.  The request does not include funds  for continued support of the National
Rural Water Association network of training and technical  support to small systems.

Program Description

     Under the Safe Drinking Water Act  (SDWA),  the 57  States  and  Territories are
expected to  assume the primary  role  in  the implementation  and  enforcement  of
public water  system  supervision (PWS)  and  underground  injection control  (UIC)
regulations.  State  program  grants  provide   financial  assistance to  States  in
meeting their regulatory responsibilities.  To  be eligible for  continuing PWS  or
UIC grants, a State must assume formal primary enforcement  authority,  or primacy,
for that program from  EPA.   Where  a  State has  not  assumed primacy for  UIC,  EPA
may use grant funds to implement a  program.

     The SDWA  also authorizes  Federal  financial   support  for  special  studies,
demonstration projects, and training  of  State and local  personnel.   In the  past,
funds have been provided to support State Rural  Water Associations.

     Public  WaterSystem Supervision  Program Grants—    This   program  element
provides for  financial  assfsfance^tor'those  States  which have  assumed  primary
enforcement  responsibility  for  implementing  Federally approved  safe drinking
water programs.

     Underground Injection Control  Program Grants  --  This  program  element  pro-
vides for financial support to  allStateswhich have assumed  primary  enforcement
responsibility for  the Underground   Injection  Control  Program.    However,   for
States not accepting delegation, EPA  may use  funds allocated  for  grants to those
States for conducting  UIC  implementation activities  in those  non-primacy States.

     _Sj»c1al_ Studies and Deironstrations -- This program  element  includes grants
to theNationalRural Water Association, which provides for  training and technical
assistance to small rural  water programs.

     Training—  This program  element  includes  the  institutional  grants   and
fellowships for  professional  training  in the  drinking  water  field,  covering
both the public water system supervision  and ground water protection programs.

PUBLICWATER SYSTEM SUPERVISIONPROgRAMGRANTS

1981Accomplishments

     In 1981 the  Agency obligated  $30,188,800  for  Public Water Systems Super-
vision grants to 49  primacy  States.   This represented  approximately  53% of the
total cost to  administer the  primacy State programs.  These  funds  supported the
entire range  of  State Public  Water  System Supervision  activities,  including
surveillance of  systems (sanitary  surveys  to  identify violations  and  on-site
assistance to  operators),  enforcement against recalcitrant violators,  provision
of laboratory  capacity necessary to test  water quality (including State certi-
fication of laboratories with authority to conduct tests), and the other activities
necessary to  ensure  adequate health  protection.  In  addition,  many States  with
systems serving  over  75,000  people  developed  and .adopted   revisions to their
existing standards to  include the trihalomethane,  or THM,  standards,  and  many
                                     DM-35

-------
initiated THH monitoring  programs.   Grant funds  were used also  to  increase  the
monitoring and compliance of small systems.

1982 Explanation of Changes from January Budget Estimate

                   January         March         Current
                   Estimate       Estimate       Estijwte

                529,450,000    $29,450,000    $29,450,000

   There is no change to this activity.

1982 Program

     In 1982, the Agency is allocating $29,450,000 to this program under Abatement,
Control and  Compliance.   These  funds are  available to  50  primacy States  and
Territories.  While one State,  Iowa, renounced its primacy in 1981, two territories
are expected to assume primacy this year.   These funds will  represent an estimated
49% of the total financial costs  of administering  primacy State programs. On-going
State Public Water Systems Supervision  activities will continue.  In 1982 emphasis
will be placed  on effective monitoring for  compliance  with THM  regulations  and
on improved response to contamination  of  ground  water sources of drinking water.

1983 Program Request

     The Agency requests  $23,560,000  for  public  water  system  supervision grants
to 50 primacy States  and  territories.  This  represents  a decrease of $5,890,000,
resulting from  greater State  self-reliance  and  simplified requirements.   State
follow-up activities  will  focus  on  violations of  drinking  water  standards  and
other contamination incidents  which have  the  greatest health  impact.  The States
may choose to  finance with their own resources  technical  assistance to  systems
wishing to  upgrade  their  water  supplies.   Efforts  to conduct  substantial  moni-
toring of non-community systems  will  be deferred,  as will discretionary activi-
ties to protect against  contaminants not  regulated by  Federal   drinking  water
standards.  Drinking  water  programs have  traditionally  been the purview of State
and local  governments,  and many  of  their institutional arrangements  supporting
the program are in place.

UNDERGROUND INJECTION CONTROL GRANTS

.198.1. .Accompl ishroents

     In 1981, the  Agency  obligated $7,218,700 for  grants  to  support  the imple-
mentation of  Underground   Injection   Control  (UIC)   programs.   EPA  administered
grants to 41  States  to prepare programs to  regulate  underground  injections that
may endanger drinking water sources.   Preparatory activities  involved  completion
of inventories and classification of Injection wells, the delineation of affected
aquifers, acquisition of staff and apparatus, and establishment of the appropriate
legislative and regulatory authorities.

1982 Explanationof Changes from January Budget Estimate

                   January         March         Current
                   Estimate       Estimate   ;    Estimate

                  $8,574,500     $6,574,500     $6,574,500

   The net decrease of -$2,000,000 results from the  following action:

       January - March.  (-$2,000,000)  This  change  represented  a  decrease of
   $2,000,000 from the January budget, all of which  was  for Underground Injection
   Control grants.
                                     DW-36

-------
1982 Program

     In 1982, the Agency is allocating $6,574,500 to this program under Abatement,
Control and  Compliance.   These  funds are available to support  implementation  of
the UIC program  nationally.   EPA will use funds  allotted  for States which  fail
to assume primacy to support direct  implementation in those  States  and  on  Indian
lands.

     WIC programs  regulate   injection  practices  that  pose  a  risk  to  drinking
water sources, either through permits,  less  formal  administrative rule, or  well
closure.  Regulatory measures may apply to injection wells or nearby  wells in  an
"area of review," and may apply to individual  wells or  areas  under single manage-
ment.  Permissible  injection  practices  must  meet  specific design,  construction,
maintenance, and monitoring  requirements.

     Wells requiring permits are those injecting municipal and  industrial  wastes
beneath a drinking  water source (Class  I),  some  kinds of injections  associated
with oil and  gas production  (Class  II), and  injections  associated with  mining
processes (Class  III).    Injection  of hazardous  wastes  into or above  drinking
water sources (Class IV) is  prohibited.   Miscellaneous  injection practices  (Class
V) must be  assessed  for their contamination  potential  before any regulation may
proceed.

     Other program activities include  surveillance of regulated  wells,  compila-
tion and review  of  operator monitoring  reports, enforcement  against recalcitrant
operators,  instruction  of staff and  operators  about  requirements, and  response
to emergencies  endangering  drinking  water  sources.   EPA'expects  40 States  to
have assumed primacy by the  end of 1982.

1983 ProgramRequest

     The Agency  requests  $5,540,200  under Abatement,  Control  and Compliance,  a
decrease of  $1,034,300,  reflecting   a  move  toward  greater  self-reliance and
simplified program  grant  requirements.   These  grants  support national  implemen-
tation of the UIC  program,  either by grants to primacy States or through  use  of
the funds  by EPA  in nonprimacy  jurisdictions.   These  funds  will  support the
highest priority activities:  technical  review and permitting  of  new Class  I,
II, and  II! wells;  review  and  permitting  of existing  Class  I  and  III  wells;
closure of shallow hazardous waste disposal (Class IV)  wells;  mechanical  integrity
testing of permitted wells,  surveillance  and inspections  of  permitted  and  closed
wells; review of operator monitoring reports;  assessment of impact  of Class  V
wells on ground  water quality;  and  evaluation of the  Area of Review  approach  to
all permitted new wells.  The States will establish their own  priorities  in the
use of these  grant  funds in  order to meet the statutory  and  regulatory  require-
ments of the underground injection control program.

SPECIAL STUDIES AND DEMONSTRATIONS

1981Accomplishments

     During 1981,  the  Agency  obligated  $1,530,300 to  support  the State  rural
water associations  in  their  efforts to  reach  owners  and  operators  of   small
rural water systems and to educate them  on t;he requirements  of  the  Safe Drinking
Water Act (SDWA).  Major  accomplishments  dufing 1981 were:   1)  the  participation
of 29  State rural  water associations,   an additional  four  new  States from the
previous year; 2) approximately  225  workshops on the  SDWA;  3) the provision  of
technical assistance; 4)  the  development and  distribution of a film  on  contami-
nation of public water  supplies  by inappropriate  plumbing connection  in  response
to a  need   identified  by the  Regions  and  State  Health  Departments; and 5)   a
training session for all National Rural  Water Association  (NRWA) Program Managers
and circuit  riders  to  stress latest EPA  regulations  and the  best methods for
achieving compliance.
                                      DW-37

-------
1982 Explanation of Cjianges from January Budget Estimate

                   January         March         Current
                   Estimate       Estimate       Estimate

                  51,500,000     $1,500,000     $1,823,000

   The net  increase  of  $323,000   results   from   several  actions,  as  follows:

   -  Congressional Actions.   (+$323,000)   A   reduction   of  -$1,290,000  was
   taken againstthe  March  request  reflecting  the  September  12%  reduction
   to the  Abatement,  Control  and  Compliance  appropriation.   This  reduction
   would have eliminated  financial  support  to  the National  Rural  Water Associ-
   ation program  after  November 20,  1981.   This  program entails  a network  of
   small rural  systems  in  29  States,  organized to provide training and technical
   assistance.   The  Congress  subsequently  added  back  a  total  of +$1,613,000,
   which included the original reduction of $1,290,000 and an additional $323,000
   for the Rural  Water Association  program.

1982 Program

     In  1982,  the  Agency  is  allocating  $1,823,000,  $323,000  of  which is  a
Congressional add-on,  to  continue  to  support  the  NRWA,    Meanwhile,  it  is
encouraging the  Association  to  work  towards  becoming  self-supporting.   The
programs will  emphasize technical  assistance  and  training  aimed  at  assuring
that small rural  systems provide safe drinking water.

1983 Program Request

     No funding  is  requested  for  1983.   These programs  will  have  become self-
supporting.

TRAINING

1981 Acconi.Pl i shments

     Funds  totaling  $172,000  were  obligated    in  this program during  1981.
Resources were  used to  support academic  training  for  State  agency personnel.
Sixty-one fellowships were  awarded  during 1981  to  selected personnel emphasizing
instruction in  ground water environment and management.

1982 Program

     No funding is available in 1982.

1983Program Request

     No funding is requested for  1983.
                                     DW-33

-------
                                             DRINKING HATER

                                        Drinking Hater Management

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
Public Hater Systems
Supervision
 Salaries fi Expenses
 Abatement Control S
 Compl1ance

Underground Injection
Control
 Salaries 8 Expenses
 Abatement Control &
 Compliance

TOTAL:
 Salaries S Expenses
 Abatement Control &
 Compliance

Drinking Water
Management
TOTAL
                                             (DOLLARS IN THOUSANDS)
            $5,935.5   $5,996.3   $5,482.4   $5,461.0   $4,698.2   -$762.8
              $981.0   $1,027.0     $936.9     $716.4              -$716.4
            $1,684.4   $3,825.9   $3,823.3   $3,172.2   $3,974.4    $802.2
               $32.4      $34.5      $34.5      $34.5               -$34.5
            $7,619.9   $9,822.2   $9,305.7   $8,633.2   $8,672.6     $39.4
            $1,013.4   $1,061.5     $971.4     $750.9              -$750.9
$8,633.3  $10,883.7  $10,277.1   $9,384.1    $8,672.6    -$711.5
PERMANENT FULL-TIME WORKYEARS
Public Water Systems
Supervision
               182.1
              177.0
157.0
156.4
1-28.1
-28.3

-------
                                             DRINKING WATER

                                        Drinking Water Management

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
i
o
Underground Injection
Control

TOTAL PERMANENT HORKYEARS

TOTAL WORKYEARS
Public Mater Systems
Supervision

Underground Injection
Control
 50.4
204.7
 57.9
 82.2
                                                                                82.2
80,2
232.5      259.2      239.2      236.6
82.2
110.8      110.8      108.7      110.8
2.0
                                 2-10.3     -26.3
198.5      178.5      177.7      142.5     -35.2
                                                                                                                 2.1
TOTAL HORKYEARS
262.6
309.3      289.3
                                                                                          286.^
          253.3     -33.1

-------
                                  DRINKING WATER

                            Drinking Water Management

3udget__ReQ.uest

     The Agency requests a total of $8,672,600 and 210.3 permanent workyears  for
1983, a decrease of  $711,500  and 26.3 permanent workyears from  the  current 1982
estimate.  There is  no  request in 1983  for Abatement,  Control and  Compliance
funds, which results  in  a  decrease of $750,900 from 1982  in  that  appropriation.
The Agency  request  in  Salaries and  Expenses  increases  by  $39,400 over  1982.

     Regional resources  will  be  used t.o  conduct  Federal  Public  Water  System
Supervision and Underground Injection Control programs  in  non-primacy  States  and
on Indian  Lands,  to encourage  and assist States  in program  implementation,  to
implement procedures  for the designation  of sole  and/or principal  sources  of
drinking water, and  to assist  in  assuring the  safety  of drinking  water  during
emergency situations,  particulary  in incidents  of  ground  water  contamination.

Program Description

     This subactivity  includes  EPA Regional   efforts to prevent  and control  -the
contamination of drinking  water supplies  and their sources.   The  Public  Water
System Supervision  (PWS)  program  is  aimed  at  assuring the  safety  of  drinking
water at the tap, and  the  Underground Injection Control  (UIC) program regulates
a potential  contributor  to contamination  of underground  supplies  before  their
treatment and use.
                                                               /
     EPA Regional  activities  relating to  the PWS program  involve: 1)  regulating
drinking water suppliers directly  in  non-primacy States and on  Indian  lands; 2)
assisting state and  local   utilities to  gain  access  to  the latest  scientific
information and engineering expertise relating  to  the  causes, nature  and  health
risk of contamination  and  its  removal,  as well  as  the most  practical means  of
compliance with regulations;  and 3)  assisting PWS programs in primacy  States in
complying with  current  regulatory requirements and  assuring the  provision  of
dependably safe drinking water.

     The first function involves all the activities of  a State program, including
surveillance of public  water  supplies through  inspections,  water sampling,  and
technical  consultation to operators; insuring that actions to  correct non-compli-
ance (public notification, direct  enforcement) are taken; compilation  of  compli-
ance data; and processing appl ications for variances and  exemptions. Also included
are direct  Federal  responsibilities  such  as assuring  the quality  of water  on
interstate carrier conveyances.

     Activities under  the  second  function  include scientific and  technological
assistance by experts  in water  treatment  and  the health  sciences in  dealing with
emergency situations.

     Activities under the third function  include negotiating  and managing  grant
agreements, insuring  the adoption  of new standards  by the  States,  reviewing
State data  and  reporting systems,  and  delegating the  program to the  remaining
non-primacy States.                        •

     Regional responsibilities  for ground water protection involve  1)  assisting
States in applying  for and  maintaining primacy  for Underground Injection  Control
(UIC) to insure proper implementation of  technical  requirements; 2)  implementing
UIC regulatory programs  in non-primacy  jurisdictions;  3)  assuring  that  States
possess adequate hydrogeological and  engineering information  to assure drinking
water sources  are  not  contaminated by  injection practices;  and 4)  protecting
underground drinking  water  sources  through  other means,  such as protection of
sole  source  aquifers,  and  the  capacity   to  as'sist  in emergency  situations
threatening underground sources of drinking water.
                                      DW-41

-------
     The States  and Territories  are  expected to  assume the  principal   role  in
implementing and enforcing  the UIC regulations.   Where States have  not  assumed
primacy or have no jurisdiction, EPA is responsible for implementing a regulatory
program.  This involves,  first,  the regulation  of injection practices that  pose
a risk  to  drinking  water  sources, either  by permit  or  by  rule.   Regulatory
measures may  apply to  injection  wells  or  wells  within  an  "area of  review."
Permissible injection practices must meet  specific design,  construction,  mainte-
nance, and monitoring requirements.

     Wells requiring permits are those injecting municipal  and  industrial  wastes
beneath a drinking  water source  (Class I),  some  kinds of  injections  associated
with oil and  gas production  (Class II),  and  injections  associated with mining
processes (Class III).  Injection of hazardous wastes into drinking water sources
(Class IV)  is prohibited.   Miscellaneous  injection practices  (Class  V—e.g.,
injection of cooling  waters)  must be assessed for their  contamination  potential
for possible  future  Federal   regulatory  action;   wells  posing  an  unacceptable
danger can be regulated immediately.

     Other program  activities  include  surveillance  of  regulated  wells,  compil-
ation and review of operator monitoring reports, enforcement against recalcitrant
operators, instruction of staff and operators  about requirements, and  response
to emergencies endangering drinking water  sources.

     Public Water System Supervision -- This program element includes  activities
related to the implementation of drinking water regulations.   EPA provides support
to States in  developing  their  capability  to administer  a  public  water  systems
supervision program.  EPA administers programs in States which do not have primary
enforcement responsibility or  in  areas  in  which  States do  not  have civil  juris-
diction.  Interstate carriers are certified,  and assistance  is  provided to States
in the review and evaluation of specific drinking water problems.   State  programs
are evaluated including triennial  review  of exemptions and variances, and grant
awards are administered.

     Underground Injection Control — This  program  element includes  activities
related to the implementation  of the  ground water  protection program.   EPA  pro-
vides support to  States  in developing their  capability  to administer  the  UIC
program.  The Agency will establish and enforce a UIC program in  States  which do
not have primary enforcement responsibility and in areas where  the States do not
have civil  jurisdiction.   Petitions are processed  for the designation  of  sole
source aquifers;  and a  review  of Federally financed projects to  determine their
impacts on aquifers  in a  "determined  sole  source"  area is  conducted;   States'
programs are evaluated and  State permit programs are reviewed.   Grant awards are
also administered in the Regions.

PUBLIC WATER SYSTEM SUPERVISION (PWS)

1981Accomplishments

     During 1981  the  Agency obligated  $6,916,500,  $5,935,500 of  which was  used
for Salaries and  Expenses and $981,000 was used for Abatement, Control  and Compli-
ance.  In 1931  the program emphasized expanding compliance  with existing  and new
standards.   Regional  programs  extended support  to  primacy States in  adopting
trihalomethane (THM) regulations  and  in fostering  improvements in small  system
compliance through the application  of  a compliance strategy.  Adoption  of stan-
dards for organic  contaminants  represented la change  in  the operating  routines
for some States  and their  systems,  which  were used to deal  with "traditional"
bacterial,  turbidity, and inorganic chemical  standards  only. Effective implemen-
tation of these  new  standards has  required  substantial   EPA  participation  and
consultation, particularly on operation of  the complicated and  sensitive  monitor^
ing methods.

     States and water  suppliers  also asked  for Regional help when confronted  by
instances of ground  water contamination,  often  in proximity to hazardous waste
                                      DW-42

-------
\                  facilities.  EPA  Regional  experts also  played  a  role in other EPA programs which
,/                  control sources  of harmful contaminants (programs like  RCRA  for hazardous waste
                   and  Superfund  for abandoned waste sites),  by assessing  the potential  of these
                   sources to  contaminate  underground  drinking  water  sources.    Extramural  funds
                   were available  to support direct  implementation  of PWS programs  in  non-primacy
                   States and on Indian lands. Funds were spent largely to obtain technical services,
                   such as laboratory analysis.

                   1982 Explanation  of Changes from January Budget Estimate

                                     January        March         Current
                                     Estimate        Estimate       Estimate

                                    $7,023,300      $6,419,300     $6,177,400

                     The net  decrease  of -$845,900 results  from  several   actions,  as  follows:

                     - January - March.   (-$604,000)  This change  represented  a decrease from the
                     the January  request, of  which  $513,900 was  for Salaries  and Expenses  and
                     $90,100 was  for  Abatement,  Control  and Compliance.  These decreases primarily
                     affected Regional  oversight of primacy  States'  programs,  with some reduction
                     in the Federal  administration  of the program  in non-primacy States and Indian
                     lands.  Specifically,  Regional  evaluations of  primacy  State programs  were
                     curtailed in 1982, and  some technical assistance to these States was deferred,

                     " Reprogranffling,   (+$68,100)   During  the development of the operating plan,
                     several misceTTaneous reprogrammings,  which are  not reportable to Congress,
                     were made  to  this   activity  and  resulted  in  a  net increase  of +$68,100.

                     - Congressional Actions.   (-$322,700)   A  reduction of -$232,500  was taken
                     against the  March estimate reflecting  the September  12%  reduction  to  the
                     Abatement, Control  and  Compliance  appropriation.   This  reduction  reflects
                     a decrease  in  contract  funds used in support  of  training  for State and local
                     water treatment operators.

                        An additional  reduction  of -$90,200  was  applied   to  the  Salaries  and
                     Expenses appropriation  to meet CongressionaTly mandated appropriation levels.

                     - Transfer  Authority.  (+$12,700)   The  net increase applied  to this activi<-
                     ty includes  an increase of $12,700 to Salaries and Expenses to cover essential
                     operating costs.

                   1982 Program

                        In 1982, the Agency is  allocating  a total of $6^177,400 and 156.4 permanent
                   workyears to this program* of  which $5,461,000 is for  Salaries  and  Expenses and
                   $716,400 is  for Abatement, Control and  Compliance.  We expect that 50 States and
                   Territories will  have primacy  in 1982: two  additional  Territories  will  assume
                   primacy, but  Iowa returned primary  enforcement  authority  in  1981.   The program
                   will  assist  States in  developing and adopting new  THM standards.   Emphasis  is
                   being redirected  to supervise the remaining  non-primacy States  and to work closely
                   with the  primacy  States as they  confront  increasingly  complex  technical  issues
                   and  emergency situations.                  ;

                        EPA cooperation  with  primacy States  on technical  problems includes  site
                   reviews, testing  underground drinking water sources, and providing engineers and
                   toxicological experts that consult with State agencies and  public water systems.
                   Extramural funds will support direct implementation of PWS programs in non-primacy
                   States and on Indian lands.
                                                        DW-43

-------
1983 Program Request

     The Agency requests $4,698,200 and  128.1 permanent workyears  under  Salaries
and Expanses, a decrease of $1,479,200.  A decrease of $762,800 and 28.3 permanent
workyears -in the  Salaries  and  Expenses  appropriation reflects  reduced  Federal
oversight of primacy States, and a decrease of $716,400 in  the Abatement,  Control
and Compliance  appropriation  reflects reduced  Federal implementation  responsi-
bilities resulting  from decreased  regulatory  demand.  Program  activities  will
involve regulating public  water systems  in non-primacy jurisdictions  and  admin-
istering grants to primacy  States.  EPA  will  provide  technical  assistance during
emergencies.

     Regional activities  to  regulate  community  water  systems  in  non-primacy
States and  Indian  lands will  maintain the  basic  compliance  mechanism:  tracking
operator self-monitoring through required operator reports and notifying violators
when they  are  discovered.  Direct action  and  follow-up  will  take  place  with
serious and  consistent  violators  of actual  Maximum  Contaminant Levels  (MCL),   We
will discontinue compliance visits  to MCL violators,  sanitary  surveys, and  over-
sight of  systems'  public  notification.    Activities  to  regulate  noncommunity
water systems  in these  jurisdictions  will  involve developing  and  maintaining  an
inventory of noncommunity  systems, and instituting the required  self-monitoring
procedure.

UNDERGROUND INJECTION CONTROL  (UIC)

1981 Activities

     During 1981 the Agency obligated $1,716,800.   Of that  amount  $1,684,400 was
used for  Salaries  and  Expenses  and $32,400 was used  for Abatement, Control  and
Compliance.  In 1981 priority was given  to assisting  States  in  establishing UIC
programs and preparing  primacy  applications.   In  addition,  EPA  started  the pre-
liminary work  to  implement the  program  directly  in  those States  that  did  not
seek grants  and reviewed  petitions  for sole source  aquifer designations.   Inven-
tories and  classification of  injection  wells  and  the delineation of  affected
aquifers were  established  to  support direct  implementation.   The  Agency  admin-
istered grants to 41 States seeking primacy.

     Region VII used  extramural  funds  to  evaluate the uses and  contamination
potential of the Karst region  ground water in southern Missouri.

1982 Explanation ofChanges from January  Budget  Estimate

                   January         March         Current
                   Estimate       Estimate      Estimate

                  $3,860,400     $3,857,800     $3,206,700

   The net  decrease of -$653,700  results  from  several  actions,  as  follows:

   -  January - March.  (-$2,600)  The change represented  a decrease of $2,600 in
   Salaries and Expenses  from the January  request,  which resulted  in  a  decrease
   of travel resources for 1982.

   "  Rejrogranming.  (-$383,200)   During  the development  of  the operating plan,
   severalmiscellaneous reprogrammings,  which are not reportable to Congressally
   were made  to this  activity  and resulted  in  a  net  decrease   of  -$383,200.

   -  Congressional Action.   (-$283,900)   An additional  reduction of -$283,909
   was "applied to  the  Salaries  and Expenses appropriation to  meet Congressional
   mandated appropriation levels,

   -  Transfer Authority.  (+$16,000)  The  net  increase applied  to  this  activity
   includes an  increase of $16,000 to Salaries and Expenses  to  cover essential
   operating costs.
                                     DU-44

-------
1982 Program

     In 1982, the Agency is allocating $3,206,700 and 80.2 permanent workyears to
this program, of  which $3,172,200 is  for Salaries  and  Expenses and  $34,500  is
for Abatement, Control  and  Compliance.  This year emphasis will shift to delegating
primacy to  qualified  States*   EPA expects  40 States to assume primacy  during
1982.

     The Regions are continuing their close cooperation  with States  to assemble
information on aquifers, respond to cases of ground  water contamination, provide
technical information  to   help  States with contamination  problems,   and  assist
them in the assumption and maintenance of primacy.

     EPA is  currently  developing implementation  plans for 17 States  and  terri-
tories which  may  not  seek delegation.  These  plans must be  enacted  within  90
days of  a  State's decision  to  forgo  delegation,  or at  the  end of  the 270-day
extension period.  In  non-delegated  States  EPA must perform or  contract for the
operation of  regulatory programs,  These include developing an  Information  base
and establishing  an  institutional framework.   Region  VII will use  extramural
resources for  conducting   studies  on  the  ground water  potential  of impending
uranium solution mining in Nebraska.

1983 Program Request

     The Agency requests a total  of  $3,974,400 and 82.2  permanent workyears, all
of which  is  for the  Salaries  and  Expenses  appropriation.   This  increase  of
$767,700 and  2.0 permanent workyears provides  additional   funding for  operational
expenses and  additional resources  for  UIC Implementation activities.   A decrease
of $34,500 in extramural funding reflects the  completion of the  Region VII study
of uranium mining.

     In 1983, Regions  will continue to  aid States  in  attaining delegation for
the Underground  injection  Control  program.  The  major  objective in  the program
is to encourage  and  assist States in developing State UIC program and management
approaches.  Priority will be given  to expediting grants  to  States with primary
enforcement responsibility  for  the  implementation  of their programs.   Because
the guidance  will be  well  established,  EPA  will  reduce   emphasis on  substantive
program guidance to  the new  State programs on  such matters as permitting  pro-
cedures, plugging and  closure  operations, inventory  verification and mechanical
integrity testing.  The Regions will  begin implementing  their  responsibilities
on Indian lands and in non-delegated  States.

     The Agency  will   retain  the  capacity  to  respond   to emergency  subsurface
water contamination.   Responses  will   be  made  where the  contamination emergency
directly affects an  underground drinking  water  source.   Review of  sole  source
aquifer petitions will  continue.

     In States where  EPA   must  implement a  UIC program,  EPA will  review permit
applications for new Class I, II, and  III wells, conduct  technical reviews before
repermltting, conduct  surveillance and  emergency actions,  and   close hazardous
wells.
                                     DW-45

-------
Page Intentionally Blank

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank .

-------
                                             DRINKING WATER

                                        Drinking Water Enforcement

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                 1982       1982       19fl2            1983  VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Drinking Water
Enforcement
 Salaries 8 Expenses
              $738. Z    $970.9      $918.2     $844.7     $856.1     $11.4
TOTAL:
 Salaries * Expenses

Drinking Mater
Enforcement
TOTAL
$738.2    $970.9      $918.2     $844.7     $856.1     $11.4

$738.2    $970.9      $918.2     $844.7     $856.1     $11.4
PERMANENT FULL-TIME WORKYEARS
Drinking Water
Enforcement
                22.9
            28.4
27.7
27.1
25.7
-1.4
TOTAL PERMANENT WORKYEARS
                22.9
            28.4
27.7
27.1
25.7
-1.4

-------
                                             DRINKING WATER

                                        Drinking Water Enforcement
                                     ACTUAL
                                      1981
        JANUARY
        ESTIMATE
          1982
         MARCH
        ESTIMATE
          1982
        CURRENT   ESTIMATE INCREASE +
        ESTIMATE    1983   DECREASE -
          1982            1983 VS 1982
TOTAL WORKYEARS
Drinking Water
Enforcement
26.6
32.0
29.9
29.3
25.7
-3.6
TOTAL WORKYEARS
26.6
32.0
29.9
29.3
25.7
-3.6

-------
                                   DRINKING WATER

                             Drinking Water Enforcement

Budget Request

     The Agency  requests  a  total  of  $856,100  and  25.7  permanent  workyears  for
1983, an increase of  $11,400 and a decrease of  1.4 permanent workyears  from 1982.
All of this amount  is  for Salaries and Expenses.  The  decrease  in  workyears is at*
tributable to the reorganization of Enforcement responsibilities within the Agency.

Program Description

     The Safe  Drinking Water  Act  of  1974,  as  amended,  provides  the  statutory
requirements for a  Federal  and  State drinking water program.   The Act assures the
safety of drinking water through two mechanisms:  the establishment and enforcement
of Primary Drinking Water Regulations, which specify the maximum  allowable levels
of drinking water contaminants,  and Underground Injection Control (UIC) regulations
for protection of underground sources of drinking water.

     The Safe  Drinking Water Act  provides  for State assumption  of  the  drinking
water program  and  requires EPA  to implement the program  in States that  have  not
been delegated enforcement  responsibility.  That Public  Water  System (PWS) program
encompasses the  following  enforcement  activities:    investigate  violations  and
initiate legal action  against violators  of the  Primary  Drinking Water Regulations
in primacy  States  which request such  assistance and in all  nonprimacy  areas and,
where necessary, initiate emergency enforcement actions,

     The Underground  Injection  Control (UIC)  program  requires  that  EPA designate
States that  can  assume the UIC program.   We  project  that  all  programs  will  be
delgated to the  States by  1985.   Enforcement program activities will  include ap-
proval of the enforcement  sections of  primacy applications for  State UIC programs,
issuance of UIC  permits  in  nonprimacy States;  preparation  for implementation  of
UIC permits; investigations  and  initiation  of enforcement  action against violators
of the regulations; and response to emergencies when  necessary.

DRINKING WATER ENFORCEMENT

1981 Accomplishments

     In 1981, the Agency obligated $738,200 in Salaries and Expenses.  During 1981,
EPA referred four  civil  actions for violations  of the Safe  Drinking  Water  Act to
the Department of  Justice (DQJ) for filing and  prosecution.   Possible emergencies
have been  evaluated to  ascertain  the appropriateness  of  the  response taken  or
planned by State and local authorities.

     Drinking water enforcement  activities also included  participation  in initial
regulatory reform activities for the Underground Injection Control  regulations and
review of  draft  and   final  UIC State program  approval  applications  from  seven
States.

  1982 Explanation of Changes from January Budget Estimate

                     January         March   ;      Current
                     Estimate       Estimate       Estimate

                    $970,900       $918,200       $844,700

     The net  decrease  of -$126,200  results  from  several  actions,  as  follows:

     -  January - March.  (-$32,700)  This change represented a decrease of $32,700
     from the January budget, all of which was for Salaries and Expenses.
                                        DW-43

-------
     "  Reorganization.   (-$20,000)  These  resources  were moved to  Technical  Sup-
     port- Officeof  Legal  and Enforcement Counsel (National  Enforcement Investi-
     gation Center  NEIC).   The functions supported  by these resources  remain the
     same; the  new  program element  for NEIC  was  created,  (a)  so that  their re-
     sources could be more readily identified and,  (b) organizationally, the center
     now falls  under the  responsibility of  the Office  of Legal  and  Enforcement
     Counsel.  As a  result of  an  agency restructuring these resources  were later
     moved to the  Interdisciplinary program  under  one program element.   This re-
     flects the consolidation of these similar activities providing quick technical
     response in emergency situations.

     "  Reprograiimin^.  (-$51,400)   During  the development of the  operating plan,
     severa'Y"mi'sceTI aneous  reprogrammings,  which are  not reportable to  Congress,
     were made  to  this  activity  and   resulted  in  a  net  decrease of  -$51,400.

     -  Congressional Action.  (-$22,300)  An additional  reduction  of -$22,300 was
     applied to the  Salaries  and  Expenses  appropriation to meet  Congressionally
     mandated appropriation levels.

     -  Transfer .A,ijthor1..ty.   (+$200) The  net  increase  applied  to this  activity
     includes an  increase of  $200  to  Salaries and  Expenses  to cover  essential
     operating costs.

1982 Program

     In 1982,  the Agency  is allocating $844,700 to this program,  all  of  which is
for the Salaries and  Expenses  appropriation.   During  1982, drinking water enforce-
ment will focus on  two  programs:   PMS  and  UIC.  A  PWS compliance assurance program
will be  implemented in  seven  non-primacy  States   and  territories  and on  Indian
lands.  A Federal  enforcement program will  be developed  and implemented  in those
States that choose  not to  implement their  own  UIC program.   EPA will  issue UIC
permits in non-primacy States.  Draft and final State UIC program approval applica-
tions will be reviewed.

1983 Program Request

     In 1983,  the  Agency  requests  a total   of $856,100  for this program,  all  of
which is  for  the Salaries  and  Expenses appropriation.   This  is  an  increase  of
$11,400 and a decrease  of 1.4 permanent workyears and  reflects  the reorganization
of enforcement responsibilities  within  the  Agency.   All  resources  associated  with
case development and legal  activities  have  been transferred to  the new  Office of
Legal and Enforcement  Counsel.   Technical  assistance and  support will  be provided
to the  Office  of Legal  and Enforcement  Counsel in  the development of  warranted
civil and criminal  referrals.

     During 1983,  drinking  water  enforcement  will  focus  on two  programs:  public
water system (PWS)  and underground  injection  control  (UIC).  PWS  activities  will
consist of support  for  compliance  assurance activities  in non-primacy  States.   UIC
activities will   include the  issuance  of UIC permits,  review  of  the  enforcement
sections of primacy applications for UIC  programs and development of the enforcement
portion of the  Federal  UIC program  to be implemented  in those States that  choose
not to implement their own UIC program.
                                       DU-49

-------
Hazardous Waste
      SECTION TAB

-------
Page Intentionally Blank

-------
                                              HAZARDOUS WASTE
                                     ACTUAL
                                      1981
                    JANUARY
                    ESTIMATE
                      1982
                         MARCH
                        ESTIMATE
                          1982
                        CURRENT   ESTIMATE INCREASE +
                        ESTIMATE    1983   DECREASE -
                          1982            1983 VS 1982
 APPROPRIATION
  Salaries & Expenses
  Abatement Control 8
  Compliance
  Research & Development

 TOTAL, Hazardous.,Waste

 PERMANENT FULL-TIME WORKYEARS
 TOTAL WORKYEARS
. OUTLAYS
 AUTHORIZATION LEVELS

 PROGRAM HIGHLIGHTS
                                              (DOLLARS IK THOUSANDS)
       $31,571.6  $35,323.7  $31,335.2  $29,200.9  $31,700.4   $2,499.5
       $86,160.2  $84,580.4  $64,804.7  $56,480.9  $53,926.1  -$2,554.8

       $23,695.9  $23,432.2  $22,700.3  $21,546.3  $17,717.2  -$3,829.1

      $141,427.7 $143,336.3 $118,840.2 $107,228.1 $103,343.7  -$3,884.4

           725.4      713.3      642.8      609,5      557.0      -52.5
           916.7    1,036.6      863.9      822.8      740.1      -82.7
      $157,182.5  $83,802.0  $77,583.0 $125,666.8 $124,857.6    -$809.2
      $166,446.0 $120,000.0 $120,000.0 $120,000.0           -$120,000.0
 Hazardous Waste Non-
 Energy
  Salaries 4 Expenses
  Research 8 Development

  Salaries 8 Expenses
  Research 8 Development
 RESEARCH 6 DEVELOPMENT
        $4,605.4   $8,536.5
       $23,695.9  $23,432.2
TOTAL
 $4,605.4
$23,695.9
$28,301.3
 $8,536.5
$23,432.2
$31,968.7
 $8,345.7   $7,942.0  $11,862.0   $3,920.0
$22,700.3  $21,546.3  $17,717.2  -$3,829,1

 $8,345.7   $7,942.0  $11,862.0   $3,920.0
$22,700.3  $21,546.3  $17,717.2  -$3,829.1
$31,046,0  $29,488.3  $29,579.2      $90.9

-------
                                             HAZARDOUS WASTE
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Waste Management
Regulations, Guidelines
& Policies
 Salaries * Expenses
 Abatement Control S
 Compliance

Financial Assistance
 Abatement Control A
 Compliance

Waste Management
Strategies Implementation
 Salaries & Expenses
 Abatement Control 6
 Compliance

Technical Assistance
 Salaries 4 Expenses
 Abatement Control &
 Compliance

Uncontrolled Hazardous
Waste Sites
 Salaries 4 Expenses
 Abatement Control 4
 Compliance
                                             (DOLLARS IN THOUSANDS)
 $6.199.3   $7,113.9   $6,614.9   $6,574.0   $6,559.0     -$15.0
$14,022.1  $21,833.6  $19,666.7  $12,358.3  $17,160.0   $4,801.7
$39,672,4  $54,300.0  $41,700.0  $41,700.0  $35,136.6  -$6,563.4
 $6,974.4   $8,626.2   $7,753.5   $7,185.7  $11,382.9   $4,197.2
 $7,411.1   $2,973.1   $2,958.1   $2,093.7   $1,629.5    -$464.2
 $1,272.4   $1,929.4
 $3,578.2   $4,993.8
 $3,069.9
$19,505.3

-------
                                             HAZARDOUS WASTE
                                    ACTUAL
                                     1981
                    JANUARY
                    ESTIMATE
                      1982
   MARCH
  ESTIMATE
    1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
                                              (DOLLARS  IN THOUSANDS)
 Salaries & Expenses
 Abatement Control 4
 Cotnpl 1 ance
ABATEMENT * CONTROL

Hazardous Waste
Enforcement
 Salaries ft Expenses
 Abatement Control 8
 Compliance

 Salaries 4 Expenses
 Abatement Control &
 Compliance
ENFORCEMENT

TOTAL PERMANENT WORKYEARS
       $17,516.0  $17,669.5
       $84,189.1  $84,100.5
$14,368.4  $13,759.7  $17,941.9   $4,182.2
$64,324.8  $56,152.0  $53,926.1  -$2,225.9
TOTAL $101,705.1 $101,770.0  $78,693.2  $69,911.7  $71,868.0   $1,956.3
        $9,450.2   $9,117.7   $8,621.1   $7,499.2   $1,896.5  -$5,602.7
        $1,941.1     $479.9     $479.9     $328.9               -$328.9
        $9,450.2   $9,117.7   $8,621.1   $7,499.2   $1,896.5  -$5,602.7
        $1,941.1     $479.9     $479.9     $328.9               -$328.9

TOTAL  $11,391.3   $9,597.6   $9,101.0   $7,828.1   $1,896.5  -$5,931.6
Hazardous Waste Non~                  69.3       105.2       101.9       102.6       130.0        27.4
Energy
RESEARCH ft DEVELOPMENT    TOTAL       69.3       105.2       101.9       102.6       130.0        27.4

Waste Management                     124.9       133.3       130.5       126.7       116.8        -9.9
Regulations, Guidelines &
Policies

Waste Management                     204.4       220.1       197.4       191.7       264.1        72.4
Strategies Implementation

Technical Assistance                  21.8       27.0

-------
HAZARDOUS WASTE

Uncontrolled Hazardous
Waste Sites
ABATEMENT « CONTROL TOTAL
Hazardous Waste
Enforcement
ENFORCEMENT TOTAL
TOTAL WORKYEARS
Hazardous Waste Non-
Energy
RESEARCH « DEVELOPMENT TOTAL
Haste Management
Regulations, Guidelines 4
Policies
Financial Assistance
Waste Management
Strategies Implementation
Technical Assistance
Uncontrolled Hazardous
Waste Sites
ABATEMENT « CONTROL TOTAL
ACTUAL
19S1
44.0
395.1
261.0
261.0

100.4
100,4
166.6

251.1
31.3
56.0
R05.0
JANUARY
ESTIMATE
1982
380.4
227.7
227.7

155.2
155.2
187.5
90.0
271.6
34.2
583.3
MARCH CURRENT ESTIMATE INCREASE +
ESTIMATE ESTIMATE 1983 DECREASE -
1982 1982 1983 VS 1982
327.9 318.4 380.9 62.5
213.0 188.5 46.1 -142.4
213.0 188.5 46.1 -142.4

151.9 157.5 188.7 31.2
151.9 157.5 188.7 31.2
180.3 173.2 157.7 -15.5

245.3 237.0 342.3 105.3

425.6 410.2 500.0 89.8

-------
HAZARDOUS WASTE



Hazardous Waste
Enforcement
EIFORCEMENT
ACTUAL
1981

311.3

TOTAL 311.3
JANUARY
ESTIMATE
1982
298.1

298. 1
MARCH
ESTIMATE
1982
286.4

286.4
CURRENT
ESTIMATE
1982
255.1

255.1
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
51.4 -203.7

51.4 -203.7

-------
                                 HAZARDOUS WASTE


OVERVIEW ANDSTRATEGY

     Approximately 43 minion metric tons  of  hazardous  wastes,  Including organic
chemicals, pesticides,  acids,  caustics,  flammables, and  explosives  were  gen-
erated in  the  United States  in  1981.    By  1983, the amount of  hazardous  waste
will Increase  by  nearly  four  million  metric  tons*   Improper  management  of
these wastes can cause  a variety of health and  environmental  damages,  including
groundwater and  surface water contamination, skin  disorders  and  Internal  ill-
ness, fire  and explosions.   Such damages  and subsequent remedial  actions  could
eventually cost hundreds of millions of dollars.

     The major goal  of  the  hazardous waste program  is  to reduce  future risks to
public health  and  the environment by  ensuring environmentally sound  management
of the  ever growing amount  of  hazardous  wastes  without  placing  unreasonable
compliance costs or  burdens on either  the hazardous  waste management industry or
the industrial  generators  of  hazardous  wastes.   The regulatory  development and
program implementation  components  of the EPA  hazardous  waste  program,  supported
by the research  and  development  and enforcement functions,   constitute  a compre-
hensive program  to  facilitate  proper Federal  attention to this  environmental
problem.

Regulatory Deyejopmen|

     The primary  goal   of the  regulatory development component is  to  establish
national standards to ensure proper  management,  transportation, treatment,  stor-
age, and disposal  of hazardous wastes.   The result  is to reduce public and envi-
ronmental exposure to known hazardous wastes  by  limiting the  future incidence of
improper or uncontrolled hazardous  waste operations.   This  authority  is derived
from Subtitle  C  of  the  Resource Conservation and  Recovery  Act  of  1976 (RCRA),
as amended.  RCRA requires EPA  to  develop  lists and  criteria  for determining
what constitutes a hazardous  waste; standards  for  handlers  of hazardous  wastes
from generation  through disposal;  technical  standards   for  permitting  hazardous
waste facilities;  and  requirements for  authorization  of  State hazardous  waste
programs.  EPA also  provides technical  and other guidance  needed by  States and
the regulated  community  for proper Implementation of the hazardous  waste regula-
tions.

     Establishing effective  hazardous  waste  standards  and  regulations  is  a
complex process  requiring  consideration  of many diverse factors.   Such factors
include the  geographic,  climatic and hydrogeological conditions  of the environ-
ment in  which  they are  released as well  as  the method  of treatment,  storage or
disposal.

     In 1982 and  1933,  the hazardous  waste   research  and  development  function
will support the  regulatory program by  developing  the   necessary  scientific and
technical data  for  establishing and  amending the  hazardous waste  regulations.
The Phase II regulations,  for  instance,  will  require each  operator to  submit a
monitoring plan  to  detect  releases of  hazardous wastes  Into the  environment.
Currently, protocols  do  not exist  for  monitoring hazardous wastes.   In  light of
this problem,  research  efforts are  systemically being   directed  to  develop  spe-
cific monitoring and quality  assurance  protocols  and  guidelines  to effectively
detect, identify,  and measure hazardous wastes.   Research  activities  are  also
being directed  to develop  the  engineering  and performance  data  required to
establish cost-effective  technical  standards  for storage  and treatment  facil-
ities, incinerators,  land treatment, and land disposal facilities.

     In order  to Institute a framework  for  comprehensive hazardous waste manage-
ment on  a  national  basis,  EPA Is following  a  phased  schedule for  issuance of
                                     HM-6

-------
RCRA regulations.  The. schedule is  intended to  satisfy  both long-standing Agency
commitments to  Federal  District  Court  and  the  new requirements  of  Executive
Order 12291,

                    Schedule for Issuance of  RCRA Regulations
CORE PROGRAM

Phase, I
₯31302  Standards for Generators of
       Hazardous Wastes

§3003  Standards of Transporters of
       Hazardous Wastes

§3001  Identification and Listing of
       Hazardous Wastes

§3004  Interim Status Standards

§3005  Consolidated Permit Regulations

§3006  State Program Requirements

Phase II
PtitftFinancial Responsibility
       Requirements - interim final
                    - final

§3004  Technical Standards for
       Storage and Treatment
       Facilities - interim final
                  - final

§3004  Technical Standards for
       Incinerators - interim final
                    - final

§3004  Technical Standards for New
       Land Disposal Facilities - interim final
                                - final

§3004  Technical Standards for Existing
       Land Disposal Facilities - interim final
                                - final
Promulgation
    Date *
 Completed


 Completed


 Completed

 Completed

 Completed

 Completed
 Completed
 September 1983
 Completed
 September 1983
 Completed
 October 1983
 Compl eted
October 1983
 February 1982
 October 1983
  *  The promulgation date represents the date the proposed regulation is printed
     in the Federal  Register.  It is  followed  by a  minimum 6 month public review
     and comment period.

     Phase I regulations, promulgated in 1980, identify and list four key charac-
teristics of  hazardous  wastes (§3001).   These  regulations  also  state  require-
ments for  proper  recordkeeping  and  reporting  by   generators   and  transporters
through the  use of  a  manifest  system  to  track  shipment  of   hazardous  wastes
(§3002, 3003).  They establish general, administrative, and interim State require-
ments for hazardous waste management  facilities  (§3004).   In addition, the Phase
I regulations  outline  requirements  for  State hazardous  waste  programs  (§3005,
3006).
                                      HH-7

-------
     Phase II,  covering  technical  and  financial   responsibility  standards  for
facilities, are partially  in  place.   Regulations  which came into effect  in  mid-
1981 establish the  technical  standards for  use  in permitting  storage  in tanks,
containers, and piles (Phase IIA), and disposal in  incinerators (Phase  IIB),  new
surface impoundments, and new land disposal facilities (Phase IIC).

     In 1982, the Agency  is developing Phase  IIC  regulations establishing stand-
ards for  existing  surface  impoundment and  land  disposal   facilities  on  a  pri-
ority basis  in  order  to  comply with  the  court  ordered  promulgation  date  of
February 1982.  All  Phase II  rules will  be in Interim final  form  through 1983.
The standards established will  incorporate  the latest scientific and  engineer-
ing data available from the research and development program.

     In 1982, EPA  Is re-examining all  of the Phase  II technical and  financial
responsibility requirements applicable  to  facilities  under RCRA  §3004   in  re-
sponse to  the Vice-President's Task  Force  on  Regulatory  Relief and  Executive
Order 12291.  The  Agency  Is  developing  a "degree  of hazard"   approach to regu-
latory reform which  correlates  costs with potential  environmental  risk  to  pro-
vide a cost-effective  approach  to waste  management.   EPA  will  perform thorough
regulatory Impact  review and  other   analyses  of  these  major  new  environmental
standards to  ensure  that the  requirements are reasonable and  not overly  burden-
some.  In  1983, these  analyses will  lead to appropriate modifications prior to
the expected  finalization of the Phase  II  standards  in  September and  October
1983.  They  will  then  apply  to  all  hazardous waste  management facilities  and
will conclude the development of an effective core program.

     In 1983, EPA regulatory  reform efforts  will  concentrate  on  refining  the
coverage established by the existing RCRA  regulations.   EPA will focus  on  pre-
paring technical  standards tailored to the specific management needs  or problems
of individual industrial  sectors or wastestreams.  These standards,  also issued
under §3004 of RCRA, can simplify requirements and reduce  costs for the affected
industries, incorporate  risk  mitigation  concepts  and specify appropriate  new
waste management alternatives.

     Listings and  del 1 stings  of  hazardous wastes  to  revise  the  initial  §3001
list will  occur periodically,  based upon  data developed  by EPA or submitted by
petitioners.

P rogram Imp1ementati on

     EPA will ultimately  delegate hazardous  waste  program  implementation  activi-
ties to the  States.  Currently,  however,  both EPA and the  States Implement  RCRA
regulations in accordance  with  the authorization  status of each State.   Interim
Authorization of States  to operate their  own hazardous  waste programs in  lieu of
the Federal  regulatory  program proceeds  in  phases consistent with the  Phase I
and Phase  II  hazardous  waste  regulatory   schedule.   RCRA   requirements  in §3006
tie State  authorization  to  the  status  of  Federal  regulations.   Twenty-seven
States achieved Interim Authorization In  1981 to  administer  a  program  substan-
tially equivalent  in coverage to  that provided  by the Phase  I  Federal  regula-
tions.  Interim Authorization is  in  effect for up  to  24 months after a  State's
receipt of  any  phase  of authorization.    This allows the  State to  upgrade  its
program from  substantial  to  full  equivalence with   the   Federal  RCRA  system.

     In 1982  and  1983,  through  Cooperative Arrangements,  the Agency will  con-
tinue to  provide  financial assistance  to  States  without  Interim  Authorization
which agree  to operate  parts  of the RCRA program on  EPA's  behalf.  The elements
of the Federal program  which  the Agency will delegate  to the  States  through  Co-
operative Arrangements  will   be  consistent  with  statutory provisions   and  the
availability of State  resources  to  carry  out the  delegable tasks.  EPA will  set
federal financial   aid,  via State-EPA negotiations,  commensurate with  the tasks
to be  delegated.   The   phased  components   of  Interim  Authorization and  Coopera-
tive Arrangements  will  maximize  early  State  participation  in  the   national
hazardous waste management program.
                                      HH-8

-------
     In 1982 and  1983,  EPA will  continue to emphasize Regional  assistance to
the States  to   develop   State  programs  eligible  for  Interim  Authorization.
However, the Agency's  primary implementation  activity in 1982  and 1983  will
be facility permitting  under the  Phase  II  regulations until  the States  are
delegated authority  to   permit   facilities.   There  are  approximately  11,000
hazardous waste storage,  treatment and  disposal  facilities.  Permitting  will
begin with  those  facility  types for  which effective  53004 standards  exist.
As EPA promulgates  remaining  §3004 standards  for  Phase II,  additional  facil-
ities will  become  eligible to receive RCRA permits  from  either  EPA  Regional
offices or authorized States.

     EPA's strategy  for  strong  and   active  program  implementation  includes
technical enforcement to ensure compliance with the RCRA hazardous  waste regu-
lations.  Compliance inspections at selected  facilities in 1982 and  1983  will
ensure compliance with Subtitle  C  requirements.  Including  the transitional  In-
terim status standards,  and lead to §3008 compliance orders,  S3007 information-
gathering demand letters and §3013 monitoring,  testing and  analysis orders.   In
addition, RCRA technical  resources  participate with Agency legal representatives
in developing Federal judicial actions for major violations  of  Subtitle C  re-
quirements.

     The permitting  and  enforcement  activities  are  supported  by  information
generated from the regulatory development  research efforts.   For instance,  the
engineering and performance  data required  by  the  program  office  to  establish
standards and  regulations  can  also be used as  a  basis for  evaluating  permit
applications more effectively and  conducting  compliance inspections  in  a  more
efficient manner.   Research  and  development activities  will  also  support  the
regulatory reform efforts through the development of transport and  fate  models
which will enable the Regions  and States  to Incorporate  site specific  condi-
tions into their permitting and enforcement activities.
                                      HW-9

-------
                              HAZARDOUS WASTE


SUMMARY OF INCREASES AND DECREASES
                                                       (in thousands of dollars)
     1982 Hazardous Waste Program	       $107,228.1

        Salaries and Expenses	,.         +2,499,5

        The Increase in  the  salaries and  expenses  ap-
        propriation reflects a  shift  in emphasis  to-
        ward more  in-house  research efforts,  particu-
        larly in developing  the necessary  engineering
        and technical  data  to  support the  regulations
        development for the  disposal of hazardous wastes
        through land treatment,  incineration, landfill,
        and surface impoundment.

        Research and Development	.         -3,829.1

        The decrease in  the Research and Development ap-
        propriation results  from the completion of sev-
        eral oil spill  projects  and the completion  of
        the fuel extraction  program which  has  reached
        the engineering stage where our  research  find-
        ings can be adopted  by industry.

        Abatement,  Control and  Compliance...	         -2,554.8

        The net reduction in extramural support reflects
        the decrease in  hazardous  waste grants to  the
        States and  the  increase  in regulatory  reform
        efforts.  The reduction  in grants is due to  the
        increasing ability  of the States  to fund  their
        maturing hazardous   waste programs.   Increased
        regulatory reform resources will  be  used  to
        re-examine and modify the permitting and finan-
        cial responsibility  regulations.

     1983 Hazardous Waste Program	       $103,343.7


SUMMARY OF CHANGES TO JANUARY 1982 BUDGET ESTIMATE

                                                       (in thousandsof dollars)

     January 1982 Estimate..	       $143,336.3

        January-March.	        -23,535.0

        Reorganization	           -961.1

        Reprogrammi ngs.	           +233.7

        Congressional  Actions.....	..        -11,751.6

        A decrease of $6,251,200 to  Abatement,  Control
        and Compliance and  a decrease  of  $131,900  to
        Research and Development was taken  against  the
                                        HW-10

-------
                                                      (in thousands of dollars)
   March estimate to reflect the September 12% re-
   duction.  An additional reduction of $5,368,500
   was applied to the Salaries and Expenses
   ($3,738,000), Research and Development
   ($153,500), and  Abatement,  Control  and  Comp-
   liance ($1,477,000) appropriations to meet
   Congressionally mandated  appropriation  levels.

   Transfer Authority...	«•«	             -94.2

   A net decrease of  $94,200 was  transferred from
   this program as follows: 5600,000 was transfer-
   red from  Abatement,  Control  and  Compliance;
   $1,073,600 was transferred  from  Research  and
   Development; and $1,579,400  was  transferred to
   Salaries and Expenses.

Current 1982 Estimate	        $107,228,1
                                 HW-11

-------
                                 HAZARDOUS WASTE
                                 Budget   Current              Increase +•
                        Actual  Estimate  Estimate Estimate    Decrease -
Program Activities       1981     1982      1982     1983      1983 vs. 1982

Major
Phase I and II
promulgations .........   *                  1         4          +3
Tailored
standards prom-
ulgated.......... .....   -        -         -        10          +10

Suppl emental
rules and technical
amendments to Phase I
and II promulgations..  34        -        40         25         - 15

Section 3001
delistinqs ............ 108        -       140        140            0

Regulatory
Impact Analyses
produced ...... ,.-. .....            »         -          5         +5
Program
Implementation
Guidances	  12       25        15         25         + 10

States with
hazardous waste grant/
cooperative arrange-
ments............I....  54       56        54         56         *  2

States
developing Phase I
legislation/regula-
tions	  29       22        22         17         -5

States
developing legisla-
tion/regulations for
permittinq activities.  56       56         56        56            0

States with
interim authoriza-
tion:

    Phase 1	  27       34         34        39         +  5
    Phase II.....	   07          7        11         +4
                                       HW-12

-------
                                 HAZARDOUS WASTE
                                Budget    Current             Increase +
                        Actual  Estimate  Estimate Estimate   Decrease -
Program Activities       1981     1982      1932     1983     1983 vs. 1982
States
participating in CA for:
Manifest operation.	  29        22        22        17         -  5
Permit evaluation.*...  54        54        54        56         +  2

Facility
permits issued by
EPA	   1       360       ion      1020         +920

Facility
inspections by EPA....1980       666      3200      2950         -250
                                       HW-13

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
Environmental Engineering
4 Technology
 Salaries & Expenses
 Research & Development
                                           HAZARDOUS WASTE

                                       Hazardous Waste Non-Energy

ACTUAL
1981
JANUARY
ESTIMATE
1982
MARCH
ESTIMATE
1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 198Z
(DOLLARS IN THOUSANDS)
PROGRAM
Scientific Assessment
Salaries & Expenses
Research & Development
Technical Information
S Liaison
Salaries & Expenses
Research * Development
Monitoring 4 Quality
Assurance
Salaries & Expenses
Research 8 Development
Health Effects
Salaries & Expenses
Research & Development
$168.2
$380.1
$151.2
$5.9
$1,557.9
$7,840.2
$90.9
$374.0
$561.4
$261.1
$179.0
$11.5
$3,178.4
$4,982.4
$74.0
$1,168.0
$561.4
$'256.1
$179.0
$11.5
$3,138.6
$4,880.8
$72.1
$1.135.0
$527.8
$242.6
$190.5
$2,966.5
$4,272.1
$142.4
$964.7
$938.8
$304.9
$182.4
$90.0
$3,521.2
$3,662.1
$376.5
$691.9
$411.0
$62.3
-$8.1
$90.0
$554.7
-$610.0
$234.1
-$272.8
 $2,495.2   $2,968.7   $2,929.4   $2,511.6   $4,524.9  $2,013.3
$14,665.1  $15,310.8  $14,718.5  $14,582.5  $10,408.4 -$4,174.1

-------
                                           HAZARDOUS WASTE

                                      Hazardous Waste Non-Energy
                                     ACTUAL
                                      1981
             JANUARY
             ESTIMATE
               1982
 MARCH
ESTIMATE
  1982
CURRENT   ESTIMATE INCREASE *
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
Environmental
Processes & Effects
 Salaries & Expenses
 Research 4 Development

TOTAL:
 Salaries 5 Expenses
 Research 8 Development

Hazardous Haste Non-    TOTAL
Energy
                                              (DOLLARS IN THOUSANDS)
   $142.0   $1,575.0   $1,465.2   $1,603.2   $2,318.2    $715.0
   $430.6   $1,698.4   $1,698.4   $1,484.4   $2,559.9  $1,075.5


 $4,605.4   $8,536.5   $8,345.7   $7,942.0  $11,862.0  $3,920.0
$23,695.9  $23,432.2  $22,700.3  $21,546.3  $17,717.2 -$3,829.1
$28,301.3  $31,968.7  $31,046.0  $29,488.3  $29,579.2
                                  $90.9
PERMANENT FULL-TNE HORKYEARS
Scientific Assessment
Technical Information
& Liaison
Monitoring & Quality
Assurance
Health Effects
2.0
2.5
20.7
2.0
10.8
3.1
30.1
1.9
10.8
3.1
30.1
1.9
10.5
3.1
20.6
1.9
14.5
2.1
22.0
4.0
4.0
-1.0
1,4
2.1

-------
£ Technology

Environmental
Processes & Effects
                                           HAZARDOUS WASTE

                                      Hazardous Waste Non-Energy

                                     ACTUAL    JANUARY     MARCH      CURRENT    ESTIMATE INCREASE  +
                                      1981     ESTIMATE   ESTIMATE    ESTIMATE     1983    DECREASE  -
                                                  1982        1982        1982             1983  VS 1982
Environmental Engineering
5 Technology
Environmental
Processes & Effects
TOTAL PERMANENT WORK YEARS
TOTAL WORK YEARS
Scientific Assessment
Technical Information
& Liaison
Monitoring & Quality
Assurance
Health Effects
Environmental Engineering
39.7

2.4

69.3

6.7
4.7

29.7.
2.0
54.1
35.0

24.3

105.2

17.2
4.8

39.4
1.9
53.3
35.0

21.0

101.9

17.2
4.8

39.4
1.9
53.3
38.5

28.0

102.6

16.9
4.8

33.5
1.9
56.8
59.0

28.4

130.0

21.0
3.7

32.0
4.0
79.9
20.5

.4

21 A

4.1
-1.1

-1.5
2.1
23.1
  3.2
 38.6
35.3
43.6
48.1
4.5
TOTAL WORKYEARS
100.4
155.2      151.9
          157.5
          188.7
          31.2

-------
                               HAZARDOUS WASTE

                          Hazardous Waste Non-Energy

Budget Request

     The Agenqy requests a total of $29,579,200 and 130.0 permanent work years for
1983, an Increase  of $90,900 and  27.4 permanent workyears from  1982.   Included
1n this  total   Is  $11,862,000  for Salaries  and Expenses  and $17,717,200   for
Research and  Development,  with  an  Increase  of $3,920,000  and  a  decrease  of
$3,829,100, respectively.  The Increase In resources reflects  a shift 1n anphasis
towards more  in-house research  efforts; the  decrease reflects  the  completion
of several oil  spills projects  and the completion  of the  fuel extraction program
which has  reached  the  engineering  stage where our  research findings  can  be
adapted by Industry.

Program Description

     Consistent with  the  goals  of the  Resource Conservation  and  Recovery  Act
of 1976  (RCRA),  the  objective  of  the hazardous waste research  and  development
program Is  to  develop  the  technologies,   methodologies  and  scientific  data
bases necessary  to  achieve  environmentally  acceptable,  cost-effective  solid
and hazardous waste management from generation through disposal.

     The research  program  provides  the  scientific  basis which  will  allow  the
private and public  sectors to  (1)  reduce  the  quantities  of  waste,  especially
hazardous waste, requiring  disposal through  process change,   waste  recycle  and
reuse or  waste  treatment,  (2)  ensure  environmentally  sound  disposal  and  de-
struction of future  wastes and  (3) correct  past  mismanagement  practices.   The
major objective 1s to support the  regulatory and enforcement  efforts  In  (a)  the
Identification and   listing  of  hazardous wastes,  hazardous  waste  streams  from
industry and  "polluting"  hazardous  waste disposal  sites; (b)  development  and
revision of regulations  for  disposal  of wastes by  land disposal,  thermal  de-
struction or  chemical,  biological   or physical  treatment;  (c) providing  assis-
tance in the  evaluation  of permit applications; (d) development  and  evaluation
of remedial action engineering  for uncontrolled polluting waste  disposal  sites;
and (e) the assessment of risk from hazardous waste  production and mismanagement.

SCIENTIFIC ASSESSMENT

1981  Accomplishments

     In 1981,  the  Agency  used  a total  of  $548,300 for  this program, of  which
$168,200 was under the Salaries  and Expenses appropriation and $380,100 was  for
extramural  purposes under the Research and Development appropriation.

     The Scientific Assessment program provided a variety  of health hazard   eval-
uation expertise to assist  the  Office of Solid Waste  In  establishing  priorities
for listing hazardous  chemicals  under Section  3001  of RCRA and  identifying  the
health consequences of various control options  under provisions of Section 3004,
Two hundred and fifty profiles of  toxicity and  exposure potential were developed
to support hazardous listing initiatives by  the  Agency and several health  asses-
sments were completed  to  evaluate  the health consequences  of employing  various
control options to  site specific and generic  disposal scenarios.

1982 Explanation of Changes from January Budget Estimate

                     January          March           Current
                     Estimate        Estimate        Estimate

                     $822,500        $817,500        $770,400

     The net decrease of -$52,100 results from the  following action:
                                      HW-17

-------
     -  January - March.  (-55,000)  This change represented a decrease of $5,000
     from the  January  budget,  all  of  which  was  for Research and  Development.

     -  Congressional Actions.  (-547,100)  An  additional  reduction  of  -$47,100
     was applied to the Salaries and Expenses  ($33,600)  and Research  and Develop-
     ment ($13,500) appropriations to meet Congressionally  mandated appropriation
     levels.

1982 Program

     In 1982,  the  Agency is  allocating a total  of  $770,400 and  10.5 permanent
workyears to this  program,  of which $527,800  is under the Salaries  and  Expenses
appropriation and  $242,600  is  for extramural  purposes  under  the Research  and
Development appropriation.

     Health hazard profiles and exposure profiles are being  developed  for use by
the Agency  in  verifying and  issuing  lists  of hazardous substances.   Evaluation
of the health hazard potential of control options, such  as incineration  of spec-
ific chemicals, is continuing.  Completed assessments are submitted to the Office
of Solid Waste  for use in setting national  guidelines and issuing permits under
various provisions of RCRA.

      In instances of  hazardous spills, the need  to  quickly  ascertain the assoc-
iated health hazards is addressed through provision of quick  turnaround summaries
of potential health  concerns  associated with  the specific chemical  or chemicals
involved.

1983 Prograin Request

       The Agency requests a total  of 51,243,700 and  14.5 permanent workyears for
this program,  of which $938,800 is  for  Salaries and  Expenses and  $304,900 is  for
Research and Development.  This results in  an increase  of $411,000  and  $62,300,
respectively, and  reflects  the  Agency's  increased   need  for  risk  asssessroent
support.

       The primary  objective  of  the Scientific  Assessment program  will be to
support regulatory development and implementation efforts, as well as  regulatory
reform efforts, by  providing  information and  methods necessary to determine the
magnitude of the human health  and environmental  risks resulting  from  the  disposal
of hazardous waste.  These  efforts  will directly  support the program  offices in
preparing Regulatory Impact Analyses  required by  Executive Order  12291,  as  well
as Agency needs under Sections 3001, 3003,  3004,  of RCRA.

       Health and  exposure  profiles  will  be  provided  for  use in the  Agency's
listing of hazardous substances under Section  3001.   A spectrum  of health assess-
ments, population-at-risk hazard assessments  and  component  exposure  evaluations
will be developed  for  QSW's  use  in  developing  national  guidance  and  addressing
site specific  control  issues  that will arise with permitting and monitoring of
existing and new disposal operations.

       Whereas the  health  profiles  developed  for  listing  use are  qualitative
only, on a selected basis and  as requested by  the  Office  of Solid  Waste,  specific
toxicity potency values  and other measures  of the  severity  of a  hazard  will be
developed for multiple use  by the  Office  of'Solid  Waste  and  Regional  Offices.

      The real-world problem  of dealing with multiple  chemical  situations  will
be addressed by developing a  first  generation assessment methodology  for evalua-
ting the hazard from multi-exposure and complex  mixture  situations.
                                       HW-18

-------
   e
       As in  1982,  a quick turnaround  capability  will  be maintained  to  provide
health summary documents  for  use in  evaluating  hazardous  spill  events,  such  as
chemical transport disasters.
TECHNICAL INFORMATION AND LIAISON
     Refer to the Oxldants Non-Energy  narrative for a description of those  Techni-
cal Information  and Liaison  activities which  are common  to all  research and
development budget activities.  Activities  specific to  this  budget activity are
Indicated in the program element description below.
1981 Accomplishments
     In 1981, the  Agency used  a  total   of  $157,100 for  this program, of  which
$151,200 was  under  the Salaries  and  Expenses appropriation  and 55,900 was for
extramural  purposes under the Research and Development appropriation.
     Specific products produced 1n support of the Hazardous Waste research  program
included:
     - A  users   guide  on  hazardous  waste incinerator  measurement  protocols;
     - A users guide on methods for  sampling hazardous waste;
     - A  users   guide  to  test methods for  toxlcity of  leachates  development
       and validation;
     - A National conference on hazardous and toxic waste;
     - The  Seventh  Annual  Research  Symposium on  Hazardous  and Municipal  Solid
       Waste;
     - A Technical  Resource Document on  hazardous waste land  treatment.
1982 Explanation of Changes froih January Budget Estimate
                     January          March          Current
                     Estimate         Estimate        Estimate
                     $190,500        $190,500        $190,500
     -  Transfer Authorlty.  (No Change)   The net  change  applied to this  activity
     is madeup  of  a  decrease  of  -$11,500 to Research and Development and an In-
     crease of +$11,500 to  Salaries and Expenses.   There  1s  no  adverse Research
     and Development impact.  The reductions are minimal  throughout the elements
     and represent  lower than  anticipated  costs.   Tne Salaries and Expenses in-
     crease will  cover current operating expenses.
1982 Program
     In 1982, the Agency  1s allocating  a total  of $ 190,500 and 3.1  permanent
workyears to  this  program, all   of  which  Is  under  the   Salaries  and Expenses
appropriation.
     Specific activities include developing:
     - A users guide of methods for  analyzing hazardous waste;
     - A users  guide  of procedures  and logistics for emergency  monitoring  of
       hazardous  waste sites;
     - A users guide of methods for  field Investigators of hazardous waste sites;
                                      HW-19

-------
     - A guidance document  on exposure assessment guidelines  for hazardous  waste
       sites;

     - A handbook  of hazardous  material  spill  site  safety  cleanup  procedures,

1983 Program_ge_qu_e_5t

     The Agency requests a total  of $272,400 and 2.1 permanent workyears for this
program, of which $182,400 is for Salaries and Expenses and 590,000 is for Research
and Development.  This reflects a decrease of $ 8,100,  and an  increase of $90,000
respectively, which will  increase the amount  of direct  technical  information and
liaison support provided.

      In 1983, the Technical Information and Liaison program will stress providing
the necessary technical   information  to  State and local  officials 1n  support  of
their increased role in administering envlronmental  programs.

MONITORING SYSTEMS ANDQUALITYASSURANCE

1981Accomplishments

     In 1981, the Agency  used  a  total  of $9,398,100 for this program, of  which
$1,557,900 was  under the Salaries  and   Expenses   appropriation  and  $7,840,200
was for  extramural  purposes under  the Research  and Development  appropriation.

     An extensive effort was undertaken in hazardous waste monitoring and quality
assurance to  establish  techniques  that  provided a sound  scientific  and  legal
basis for the data required by the Resource  Conservation  and  Recovery Act (RCRA)
regulations and the uncontrolled  hazardous waste site program.   Major activities
included:

     - Developing  and  evaluating  protocol   procedures  for  obtaining  hazardous
       waste samples  to support the Office  of Solid  Waste  (OSU)  for  Section
       3001 of RCRA;

     - Evaluating methods for analysis   of  samples to  support enforcement  of
       Section 3001 of RCRA;

     - Developing  a  draft  manual   using  the  best  available  methodology  for
       analysis of samples.   The manual  will  be used for validating data
       obtained for  satisfying the  requirements of  40  CFR Part  261,  Identifica-
       tion and Listing of Hazardous Waste;

     - Providing analytical  methods  for  characterizing wastes  listed in  RCRA,
       Section 3001 to  enable OSU to document  associated  toxic  chemical hazards;

     - Initiating i ntercompari son studies on performance of contract laboratories
       providing support for enforcement  of Section  3004 of RCRA.

1982 Explanation of Changes fromJanuaryBudget Estimate

                     January          March           Current
                     Estimate        Estimate        Estimate

                   $8,160,800      $8,019,406     $7,238,600

     The net  decrease  of  -$922,200  results from  several actions  as  follows:

     -  January - March.   (-$141,400)  This  change represented a  decrease  of
     $141,400 from  tne^ January budget,  of  which $39,800 was  for Salaries  and
     Expenses and  $101,600 was  for  Research  and  Development.   This  decrease
     resulted in  fewer  standard  reference  samples  for  conducting  hazardous
     waste analytical tests  In  the  Quality  Assurance  program and  fewer-on-site
                                       HW-20

-------
     laboratory evaluations as  well  as  fewer types  of intercomparison  samples
     being available for contractor laboratories.

     "  Reprogramining.  (+$414,100)  A  reprogramming of +$542,000 from a  major
     portion of the old municipal program concerned  aerial  surveillance  research
     to support spills.  These efforts are now closely  related to the objectives
     of the hazardous waste program.

        A second  reprogramming  reduced  this activity by =$326,900.   The purpose
     of this  transfer  is  to  perform  chemical  analysis  of  samples  collected
     during the conduct of transport  and  fate  research.   These analyses  were
     formerly performed in this  program  and  are  now all more  appropriately per-
     formed by the environmental  processes and effects program.

        A third Agency-wide reprogramming -$1,000  provided  resources  for transfer
     of the  accountability  function  to  the  Office  of Management  Systems  and
     Evaluation and, in addition, provided additional  resources for the Immediate
     Office the Assistant Administrator  for  Solid Waste and Emergency Response.
     (These three  reprogrammings totalling +$214,100  were included in a letter to
     Congress on December 16,  1981).

        During the development of the operating plan, several miscellaneous repro-
     grammings, which are not reportable to  Congress,  were made to this  activity
     and resulted  in a net increase of +$200,000.

     -  Congressional  Actions.  (-$1,194,900)  A reduction  of -$131,900 was  taken
     against the rtarch  estimate reflecting  the  September  12% reduction to  the
     Research and  Development appropriation.  This reduction reflects a decision
     to postpone research on capillary column applications  of gas chromatography/
     mass spectrometry methods  to  monitor hazardous  pollutants and  to  rely  on
     presently available methods  for  this fiscal year.  This  also reflects reduced
     contractual support necessary  for In-house laboratory  efforts.

        An additional  reduction  of  -$1,063,000 was  applied to the  Salaries  and
     Expenses ($1,023,000)  and Research  and  Development ($40,000)  appropriations
     to meet Congresssionally  mandated appropriation  levels.

     -  Transfer Authority.   (No Change)   The net  change applied to this  activity
     is made up of a decrease  of  -$641,800 to Research  and Development and an
     Increase of +$641,800 to  Salaries and Expenses.  The Research and Development
     decrease reflects a delay in methods of research  on evaluation  modification
     of chemical/biological  test procedures  used  in  the monitoring  of water  and
     wastes, and the  postponement  of modest outputs  until  1983.   The  Salaries
     and Expenses  increase will  support  equipment  to  be used for referee analysis
     associated with the  Agency's  mandatory  Quality Assurance program and  for
     in-house research on improvement of Section 304(h)  methodology.

1982 Program

     In 1982, the Agency is allocating  a total of $7,238,600  and 20.6 permanent
work years to this  program,  of  which $2,966,500 is  under the Salaries  and  Expenses
appropriation and  54,272,100  is  for extramural purposes under the  Research  and
Development appropriation.

     In 1982, activities  continue  to focus  on providing methods  and  guidelines
for the Identification of hazardous wastes to establish the  level  of risk  of the
waste and to  support the enforcement  function which   relies  heavily on  having
scientifically validated and legally  defensible data.  Efforts underway
include:

     - Developing   a quality  assurance  program  to  support  implementation  and
       enforcement of RCRA regulations;
                                       HU-21

-------
     - Providing  standard  reference materials and methods;

     . Developing quality assurance procedures;

     - Conducting equivalency tests;

     - Evaluating  and improving  the  "Best Available  Methods"  for  analysis and
       sampling of hazardous wastes;

     - Developing  monitoring  guidelines,  measurement methods,  protocols,  and
       equipment for  specific hazardous waste problems;

     - Evaluating and improving advanced analytical techniques;

     - Providing  support to the  Office  of Solid  Waste  in response  to  specific
       hazardous waste situations.

1983Program Request

     The Agency requests a total  of $7,183,300 and 22.0  permanent  workyears for
this program,  of  which  $3,521,200  is  for  Salaries and Expenses and $3,662,100
is  for Research  and  Development,   This  reflects an  increase of $554,700  and  a
decrease of  $610,000, respectively.  The  increase is the  result of additional
tasks for  response to emergency oil and  hazardous  spills  required by  Section 311
of the  Clean  Water  Act, and the  evaluation  of  groundwater monitoring  systems
required to  support  hazardous waste permitting and enforcement operations.  The
decrease results  from completing several  special projects  required to  support
the Office of  Solid Waste regulatory development efforts.

     The major objective of the  1983  program Is  to  continue providing  new and
improved methods  and  guidelines  for  the identification  of   hazardous wastes  to
support regulatory development  and  Implementation efforts.   These  efforts  are
focused in the following three areas:

     Monitoring Methodologies.  In this  area,  research will   continue to  develop
sampling procedures at  hazardous  waste  operations.,  chemical  procedures  for the
analysis of  wastes and  waste-site samples, and bioindicator  tests  and ecosystem
survey methods to  assess the relative  hazard of  complex  waste  mixtures on the
condition of the local environment.  Research efforts will  also continue to develop
methods and characterize the subsurface and groundwater of waste sites.

     Monitoring Guideljnes.  An immediate output of developing monitoring methodo-
1 ogies Is the ibilffy to design guidelines for specific applications.   Efforts  in
this area will continue  in  developing monitoring  guidelines  oriented  to  specific
applications, such as land  disposal. Incineration,  storage,  and  site investiga-
tion.  These guidelines  Identify the data required and the methods, protocols, and
equipment to be used  to gather that data.  They  will  also provide  step-by-step
guidance for establishing a systematic approach at monitoring the site or operation
in question.

     Quality Assurance:   The  objective  of  the  quality assurance program  is  to
ensure that  data  of   known  quality  are being collected to support the  Agency's
hazardous waste monitoring  efforts.  This  area supports both the methodology and
guideline efforts previously discussed.   Specifically,  research  efforts  in this
area will  continue to involve development-of validated and  standardized  methods
for sampling and  analytical methods and  Include: development and evaluation  of
analytical  standards   for Instrument calibration;  development and evaluation  of
reference solutions  for  evaluation  of  laboratory  performance;  validation  of
sampling, analytical   and  biological methods;  and the development of  equivalency
methods for validated methods.
                                      HW-22

-------
     Other areas include:
     - Testing  new  and  improved  remote sensing  and  geophysical techniques  for
       monitoring and locating visible and buried hazardous waste sites;
     - Conducting post-closure  monitoring  research to develop monitoring  guide-
       lines for closed hazardous waste disposal  facilities;
     - Providing equipment and expertise to the National  Response Team in support
       of oils spills.
HEALTHEFFECTS
1981 Accomplishments
     In 1981, the Agency used  a total  of  £464,900 for  this  program, of  which
590,900  was under the  Salaries  and Expenses appropriation and  $374,000 was  for
extramural purposes under the Research and Development appropriation.
     The following outputs ware produced:
     - A test system to  determine the  effects  of hazardous  wastes on  development
       of the reproductive system in the neonate was developed and  will  be  vali-
       dated In 1982 with actual  samples of  hazardous  wastes,   this  Is part of
       a screening test  system  to  determine the  effects  of hazardous wastes  on
       the development  of various  organ  systems In neonates.   Upon  completion,
       this product  will be used to support  permitting operations.
     The following two efforts were completed and will  be used  for the protection
of workers at both permitted and uncontrolled hazardous waste sites:
     - The hemoglobin ad duct  assay  was developed and  will be validated  In  1982.
       This assay will  be useful  as a potential dose monitor In humans exposed to
       hazardous wastes,
     - The hardware and software for the field test battery for use  1n evaluating
       behavior performance impairment  1n human populations was developed.  Labor-
       atory and  field  tests  will   establish  the reliability of  these  systems
       while collecting a normative  data base  for measures of human  behavior in
       1982.
1932 Explanation of  Changes from January Budget Estimate
                  January        March            Current
                 Estimate       Estimate        Estimate
                $1,242,000     $1,207,100      $1,107,100
     The net decrease  of -$134,900  results  from several  actions,  as  follows:
    *  January - March.   (-$34,900)   This change represented a decrease of $34,900
     from the January budget, of which $1,900 was for Salaries  and Expenses  and
     $33,000 was for Research and Development.
     -  Congressional  Actions.  (-$100,000)   An additional  reduction of -$100,000
                                      HU-23

-------
     was applied  to  the Research and Development appropriation to  meet  Congres-
     sional ly mandated appropriation levels.

     -  Transfer Authority. (No  Change)  The  net  change  applied to  this  activity
     is made up ofadecrease of -$70,300 to Research and Development an  increase
     of +$70,300 to Salaries and Expenses.   The Research and Development re-
     duction will result  in  one project being reduced and delaying the  expected
     completion date.  The  Salaries and Expenses  increase  will be used  to meet
     necessary salaries expenses.

1982 Program

     In 1982, the  Agency is allocating  a  total  of $1,107,100  and  1.9  permanent
workyears to this  program of which  $142,400  is  under the Salaries and  Expenses
appropriation and  $964,700 is  for  extramural  purposes  under  the  Research  and
Development appropriation

   The 1982  Health  Effects Research  program  includes the following  activities.

   - A screening and  identification test system to measure the effect of  hazardous
     waste on development of the reproductive system in neonatal animals  is being
     applied to  testing  of actual  hazardous  waste  mixtures.   Research is  also
     being conducted to develop and validate test systems to determine the effects
     of hazardous wastes  on development  of  the renal and cardiovascular  systems.
     These efforts will support hazardous waste permitting  operations.

   - Validation of the hemoglobin adduct assay is  being accomplished by  comparing
     the formation  of  major hemoglobin  adducts   formed  in  animals  exposed  to
     hazardous wastes  to  those  observed  in human  populations  for  use  in  risk
     assessment.

   - Development of a neurological testing system to determine the adverse effects
     of exposure to  hazardous  wastes on  human behavior is  being  completed.   A
     normative data base is being developed  to determine human sensory, cognitive,
     and motor performance capabilities.

     These latter  efforts will  provide mechanisms  to  rapidly identify  health
problems in  workers  at hazardous  waste sites.   They  also  will  be used  during
permitting, compliance monitoring and cleanup operations.

1983Program Request

     The Agency  requests  a total of $1,068,400 and 4.0  permanent  workyears  for
this program,  of which  $376,500  1s  for  Salaries  and  Expenses  and   5691,900
1s for  Research  and  Development.   This  reflects  an  Increase of  $234,100  and
a decrease of  $272,800,  respectively.   This  net decrease  of $38,700  reflects
a shift  in emphasis  towards  more  In-house research  to  validate  and  Implement
hazardous waste health test systems.

     The primary objective of health effects research will be to support permitting
and enforcement activities by validating and implementing short-term test  systems
for use 1n evaluating  the health effects of exposure to  complex hazardous  wastes
mixtures.  These test  systems  are  state-of-the-art for testing single compounds
but require validation for use on complex mixtures.   One  of  the biggest  data gaps
inherent In performing risk assessment;  1n  the hazardous waste area is  the lack
of standard,  validated in vivo  and  vitro  tests  which can  be  reliably  used  to
assess the hazard potential of  complex  mixtures 1n  a relatively quick and  cost-
effective manner.  Test systems  will be validated in the areas of general  toxicity,
mutagenlcity, cardnogenicity,  reproduction/tetratology and neurotoxlcity.

     In addition,  currently  available  methods  1n  population  toxicology  will
be validated for use In assessing impacts of hazardous  wastes on health.   Methods
will be validated  1n  order to  assess  the use of  sanplable human  tissues  as  an
                                      HW-24

-------
integrator of important chemical  exposures from sites or spills (dose assessment);
and to identify specific  biological  indicators  of both acute and  chronic  health
effects which can  be used to measure the impact of exposure to hazardous substances
in populations (indicators  of  response).   These outputs  will  be used by  OSW  in
developing better risk assessment models,  particularly in improving extrapolation
models which project human health effects  from animal  data.

              ENGINEERING AMD TECHNOLOGY
1981 Accompl 1 shments

     In 1981, tt»e Agency  used  a total  of $17,160,300 for this program,  of  which
52,495,200 was under the Salaries and  Expenses  appropriation  and  $14,665,100  was
for extramural purposes under the Research and Development appropriation.

     The hazardous  waste  environmental  engineering  and technology  program  1s
designed to support regulatory development  and  implementation efforts  by genera-
ting the technical data bases  necessary  for the reduction, elimination  and safe
disposal of  hazardous  wastes.   Specific accomplishments  for this  program  are
divided among three areas, all  of which  support RCRA regulatory  development  and
implementation efforts.

     Landfill and Surface  Impoundment.  Accomplishments   1n   this   area  Included
the preparation o?  right  Technical  Resource Documents  (TRD)  and  other  research
materials to  support  the Office  of  Solid  Waste  regulatory  development  and
permitting efforts.   These  documents  reflect  Best  Engineering  Judgement  (BEJ)
data accumulated  over  years  of  research  in   the  areas  of  landfill ing,  land
treatment and surface Impoundment.

     Land Treatment.  A hazardous  waste  land  treatment manual  which  summarizes
existing data needed for designing land treatment systems was completed.   Informa-
tion was also compiled on  proper closure procedures for existing land  treatment
sites where  adequate  records  were  not  maintained.   This  information  is  being
used by the Office of Solid Waste In developing regulations.

     Incineration.  Accomplishments   1n  this  area  Included  publication of  the
RCRA support  document  "Engineering  Handbook Waste  Incineration," as  well  as  a
substantial level  of   technical  assistance  to  the Office   of  Solid  waste  in
developing the final  RCRA  performance standards for  hazardous waste  Incinerators.

1982 Expl anation of Changes from January  Budget Estimate

                     January          March           Current
                     Estimate        Estimate         Estimate

                  $18,279,500     $17,647,900      517,094,100

     The net  decrease  of  -$1,185,400  results  from  several  actions as  follows:

     -  January - March.    (-5631,600)   This  change  represented  a  decrease  of
     $631,600 from the January budget,  of  which $39,300  was  for  Salaries  and
     Expenses and $592,300 was  for  Research  and   Development.   This  decrease
     affected activities   dealing with  the  evaluation  of   field  test  methods
     for response  to  hazardous  waste disposal  problems  and  the  development
     of remedial  action alternatives for  hazardous waste disposal  sites.

     -  Reprogramming.   (-$68,600)  This  Agency-wide reprogranroii ng provided  re-
     sources for transfer  of the accountability function to  the Office  of Manage-
     ment Systems and Evaluation  and.  in  addition,  provided  additional  resources
     for the Immediate  Office of the Assistant Administrator  for  Solid  Waste  and
     Emergency Response.   (This reprogramml ng was Included  in letter to  Congress
     on December 16, 1981).
                                        HW-25

-------
     -  Congressional Actions.  (-$485,200)  An additional  reduction of -$485,200
     was applied to the Salaries and  Expenses  appropriation  to  meet Congresslon-
     ally mandated appropriation levels.

     "  TransferAuthority.  (Mo Change)   The net change applied to this activity
     is made  up  ofa decrease  of  -$136,000 to  Research and Development  and an
     increase of +$136,000 to Salaries and Expenses.

        The transfer of $86,000  will  result  in  no sacrifice to accomplishments
     under the Research and Development  appropriation.   Some activities may have
     to be reduced marginally in scope  and the time frame for  the  completion of
     others may  have  to  be  expanded.   The Salaries  and Expenses  increase  will
     allow lab program reviews,  monitoring of extramural  projects, as well  as the
     conduct of more program evaluation  studies.

        The transfer  of  $50,000,  will   reduce  the  scope  of  initial  plans  by
     about 125 for a pilot scale landfill field verification  facility to minimize
     moisture infiltration and  leachate  generation.   The increase will  permit
     travel to monitor research  contracts, cooperative agreements and interagency
     agreements, and fund the printing  of project summaries.  This  also  permits
     this program element to share  in  some of the facility  costs.

1982 Program

     In 1982, the  Agency  is allocating  total  of $17,094,100 and  38.5  permanent
workyears to  this   program,  of  which  $2,511,600  is   under  the  Salaries  and
Expenses appropriation and  $14,582,500   is  for  extramural  purposes  under  the
Research and Development  appropriation.

     Landfill and Surface Impoundment.  In support of  the Office of Solid Waste's
permit program,as  mandated under   RCRA,  eight  Technical   Resource  Documents
are being  reviewed using  newly developed  technical information  as well  as public
comments.  Four  additional documents  are also being  prepared,  relative to  soil
permeability, leachate characterization,  landfill  closure,  and gas  emissions.
The documents will  provide the  basis  for uniform procedures in  assessing  permit
applications and should result in a reduction in the number of unnecessary appeals.
Technical assistance is being  provided  to  the  Office  of Solid Waste to  issue
revised regulations as required  by  RCRA.

     Land Treatment.  Studies are  being  undertaken to  develop   Improved  techno-
logy for land  treatment  of  hazardous waste.  This  effort  includes studies  on
proper site  closure  techniques  as  well  as  the effect of the techniques  on  soil
characteristics.  A pilot-scale  study  to  optimize  land treatment  technologies
is being  Initiated.   The  data  will   serve  as   the  basis  for  land  treatment
regulations to be issued  by the  Office of Solid Waste.

     Incineration.   In support  of development of the  Office  of Solid  Waste's
1 ncineratTon regulations,  both laboratory and pilot-scale incineration  research
is being conducted.  The  laboratory  activities  are designed to obtain a  funda-
mental  understanding  of  specific  organic  compound  behavior  as  a  function  of
temperature, residence time  and other  incineration  parameters.  These  efforts
will directly  support the  pilot-scale   research  by  assessing  compatabi 11 ty  of
the technology to waste streams, and the  verification of destruction conditions.
Pilot-scale research, which is being conducted at the Combustion  Research Facility
at Jefferson, Arkansas,  Includes an investigation of rotary kiln,  liquid  injec-
tion, molten salt, fluidized bed and  new/emer*gng technologies that may  be  candi-
dates for  hazardous  waste  disposal  options.  The program includes  an  evaluation
of air pollution control   system  efficiency and development of  the  required  sam-
pling and analysis protocols.

     In supporting the EPA Regional Offices and  State permit officials,  guidance
manuals and engineering handbooks are being developed in concert with the hazardous
                                       HW-26

-------
waste incineration regulations under RCRA.  Engineering assistance will be provid-
ed to the Agency in  developing  engineering, cost  and  performance  models  for  a
range of incineration systems. Innovative technologies for treatment, destruction
or recycling of hazardous waste streams will  also be evaluated.

     In support of the Office of Water Programs, technical support for the at-sea
incineration program  is  being provided.  This includes  an analysis  of the effec-
tiveness of  incineration of  chemical  wastes on  the VULCANUS  incineration ship
and the  ability  of this system  to  meet  the permit requirements established  by
the Regional Office.

1983 Program Request

     The Agency requests a  total  of $14,933,300 and 59.0  permanent  workyears  for
this program,  of  which  $4,524,900  is  for Salaries  and Expenses  and $10,408,400
is for  Research  and  Development.   This reflects an increase of $2,013,300  and
decrease of  $4,174,100  respectively.   The  increase in  Salaries  and  Expenses
reflects a shift in  emphasis towards  conducting more  in-house research activities.
The decrease in the  research and development program represents  the elimination
of the  fuel  extraction program which has  reached  the engineering  stage where the
private sector can  assume responsibility  for further efforts.  The  decrease also
results from the  completion of  several  oil  spills  control  technology projects.

     The 1983 engineering and technology program is  designed to support regulatory
development and implementation efforts  at the Federal,  State and local level,  as
well  as regulatory  reform efforts,  by  providing  a  technology base  for reducing
the quantity  of  hazardous  waste  through  destruction,  treatment  and  disposal
methods in  an  environmentally  safe manner.  This   information  is   necessary  to
ensure that  the  regulations  promulgated  under  Section  3004  of  RCRA  are  based
on sound  engineering  and scientific data  to achieve maximum cost-effectiveness
and provide  hazardous waste  treaters,  storers  and disposers with  the  tools
necessary to comply with  hazardous waste regulations.

     In 1983, research activities  in support of RCRA will continue  in the  major
areas of  landfill   and  surface  impoundment, land   treatment and  Incineration.
The oil   spills technology  program  has  also been   transferred  to  this  program
in 1983 to consolidate Agency research  efforts 1n  this area.   Specific activities
follow.

     Landfi11 and Surface Impoundment.   In the  area  of  land disposal,  research
to assess and  optiiiz₯  the  component  performance of a  secure landfill will  be
continued.  This research will  develop the basic Information for each component
and will  provide  the  input  for  user manuals  which will  be  prepared  to  assist
permit writers.  Research efforts to provide technical  assistance  to  State  and
local  governments for the design, construction and  operation  of secure landfills
will  include studies  to  minimize moisture infiltration and leachate  generation,
chemical stabilization of wastes,  evaluation  of Hner  materials  for hazardous
waste landfills,  and  evaluation  of techniques  for assessing pollutant  release
from in-place wastes and  contaminated soils.

     Land Treatment.  Land  treatment of hazardous  waste  1s  a potentially  cost
effecfTve~ieans  5F treatment  and  disposal.   Various  waste materials  will  be
evaluated on a pilot plot.  Percolation rates, microbiological degradation rates,
soil  changes,  management techniques,  site  closure  procedures,  loading  rates,
nutrient balances,  metals uptake,  "pre-treatment"   requirements  and  monitoring
techniques will be developed and evaluated.    .

     Incineration.  Laboratory  and  pilot  scale  incineration  studies  will   be
continued toBelter  define  the   conditions  required  for  the  destruction   of
hazardous wastes.   Development  of  improved  sampling   and   analysis  protocols
and equipment  which  can  be  used  to routinely  test  incinerators  to  ensure
                                       HW-27

-------
that they  maintain  their  destruction  efficiency  will  be  continued.   These
protocols wm  be  verified during  pilot-scale test burns  and will  be modified
for use  in  full-scale test  burns  and  for  compliance  monitoring  of commercial
facilities.  Research  will  be  conducted  to  develop   advanced hazardous  waste
treatment technology  Including  studies  on  advanced  biological  conversion pro-
cesses,, supercritical  solvents and metals  recovery using  adopted metallurgical
techniques.

     Oil Spills and Emergency Response.  Development  of  equipment   and  techni-
ques foremergency  responses5Hazardous  materials  spills  and  evaluation
of techniques for  prevention,  control and cleanup  of   spills  will  be continued.
Evaluation of  oil   spill   technologies  and  development  of  techniques  for  the
restoration and protection of  shorelines  1s  also continuing.   The  oil   spills
program was  previously  Included  in  the  Municipal  Spills-Energy   program  and
the hazardous spills  program was  Included  in the  Municipal  Uastewater program.

EHVIRQNHEUTAL PROCESSES AND EFFECTS

1981 Accomplishments

     In 1981, the  Agency  used  a total  of $572,600 for this program,  of which
$142,000 was under  the Salaries and Expenses  appropriation  and  $430,600 was for
extramural purposes under the Research and Development appropriation.

     Outputs of the 1981  research  program were  designed to  support regulatory
development and  Implementation  efforts  by  providing  Information  to  protect
groundwater from the  Improper  disposal  of hazardous wastes.   Major accomplish-
ments were the following:

     -  A  report  was prepared describing  results  of  the  use  of laboratory
        techniques, such  as   microcosms,   in   estimating  the  behavior  and fate
        of selected  organic   chemicals  In  sandy soil.   The  laboratory techni-
        ques can be used  by  the Office of  Solid Waste and  others to determine
        the mobility   of   specific  chemicals  Into  and  through  groundwater  to
        assess actual  and potential groundwater pollution problems.

     -  The  biodegradation rates  of  toluene and  chlorobenzene  1n groundwater
        were determined.   This  Information  on  these   two  widely  used  solvents
        was needed  to  assess  potential  impacts  from  past  disposal  practices
        Involving these chemicals.

     -  A national  scientific workshop was conducted for  the purpose of critically
        evaluating  a protocol which uses biological  testing  to  assess  the relative
        environmental  risks of  various hazardous waste sites.

1982 Explanatlon of Changes from January Budget Estimate

                  January        March           Current
                 Estimate       Estimate        Estimate

                $3,273,400      $3,163,600      $3,087,600

     The net  decrease of  -$185,800  results  from  several  actions,  as  follows:

     "  January - March.   (-5109,800)  This  change  represented  a  decrease  of
     $109,auu from  the January budget, all  of which was  for Salaries and Expenses.
     This decrease  resulted  In less emphasis being placed  on  the development of
     techniques for  assessing  ecological  damage  and  bioenvironmental   stress
     arising from disposal of hazardous wastes.

     -  Reprpgramiiing.  (+$326,900)  This reprogrammlng of $326,900 is to perform
     cheRiica"! analysis of samples collected during the  conduct  of transport and
     fate research.  These analyses were formerly performed within the monitoring
                                      HH-28

-------
     systems and quality assurance  activity.   Since this particular  requirement
     utilizes existing techniques, the  work 1s  more appropriately performed  by
     the environmental processes  and effects program.   (This reprogramming  was
     included in the letter to Congress  on December 16,  1981).

     -  Congresslonal Actions.  (-$218,900)  An  additional  reduction of -$218,900
     was appliedto the Salaries and Expenses appropriation to meet Congressional-
     ly mandated appropriation levels.

     -  Transfer Authority.  (-$184,000)  The net change applied to this activity
     1s made up  of adecrease of -$214,000 to  Research  and Development  and  an
     Increase of -4-530,000 to Salaries and Expenses.  The increase to Salaries and
     Expenses will   permit  stronger  response to Technical  Assistance  requests
     through additional  travel funds; permit the transportation of household goods
     needed for  filling a  vacancy;  permit maintenance of several  scientific in»-
     struments critical  to planned  work;  and  purchase  laboratory supplies  to
     keep analytical workloads at planned levels.

        The decrease is  to  an  existing Stanford University Hazardous Waste Cooper-
     ative Agreement  and will  not affect  the project;  the completion  date  will
     be delayed.

1982 Program

     In 1982, the  Agency is  allocating  a total  of $3,087,600 and 28.0 permanent
workyears to this program,  of which  51,603,200 is under  the Salaries and Expenses
appropriation and 51,484,400  is  for extramural   purposes  under the Research  and
Development appropriation.

     This program  is  expanding  from  addressing  only the processes and  effects
in the  subsurface  environment to providing  scientific data  for  assessing  the
entire scope of  environmental  Impacts  of  hazardous  waste disposal.  This  work,
closely coordinated  with   research  on  groundwater,   concentrates on  predictive
model development  and field  evaluation  of  both  the  models under  development
and the  method  for  approximating  subsurface  mobility  (microcosms)   developed
in 1981.   New  activities  in  ecological  effects and  environmental  assessment
modeling-are expanding  on  knowledge  gained in  other  research areas  such  as
water quality  and  toxic chemicals,   and will  allow  adaptation of  these  methods
for use  in  evaluating  hazardous  waste disposal.   Specifically, the  expansion
provides for adapting and developing  techniques  for assessing  ecological  dam-
age from disposal  of  hazardous  wastes  and  their  entry  Into the  food  chain,  re-
lating ecological  effects  parameters  to potential  effects on humans,  developing
protocols for  damage  assessment,  and determining the  relationship of  bioassay
techniques to  real  ecological  impacts.   Finally,  expanded  environmental  assess-
ment modeling activities "will provide tools for  evaluating  the relative environ-
mental Impacts of various disposal methods.

1983 Program Request

     The Agency requests a total  of $4,878,100  and 28.4 permanent  workyears for
this program, of which $2,318,200 is  for Salaries and Expenses appropriation and
$2,559,900 is  for   the  Research  and Development approbation.   This  reflects
an increase of 1715,000  and $1,075,500,  respectively, which will be used to expand
both in-house  and   extamural  efforts   in  developing subsurface  and  multimedia
transport and  fate  models.  These models  will   support permitting of  hazardous
waste facilities in a cost-effective manner by  providing the  Regions  and States
with the tools to evaluate  and assess, on a  site specific basis, the environmental
impacts (air, soil, groundwater)  from the disposal  of hazardous wastes.
                                       HW-29

-------
     The major thrust  of this program in  1983 will  be  to support the  Agency's
regulatory Implementation  and  reform  efforts  by  expanding  the development  and
evaluation of  transport  and fate models  to assess  the  environmental Impact of
hazardous waste disposal  in a cost-effective  manner.  The objective  being  that
as ecological impacts  are  estimated more accurately, regulations can  be  designed
more carefully to gain  the most  benefit at least  cost.  These  modelling efforts
will enable the Regions and States to:

     -  improve the  state-of-knowledge for  determining  impacts on  groundwater;

     -  indicate potential  health problems through the transport  and fate of  a
        particular waste;

     -  evaluate the potential for human exposure  to  mismanaged hazardous wastes
        through the food chain;

     -  adapt methods  used  in  other fields for comparing the impacts of various
        disposal  options.
                                       HW-30

-------
Page Intentionally Blank

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                           HAZARDOUS WASTE

                         Waste Management Regulations, Guidelines S Policies
                                     ACTUAL
                                      1981
             JANUARY
             ESTIMATE
               1982
             MARCH
            ESTIMATE
              1982
CURRENT
ESTIMATE
  1982
ESTIMATE INCREASE +
  1983   DECREASE -
        1983 VS 198Z
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Regulations,
Guidelines 8 Policies
Hazardous Waste
 Salaries & Expenses
 Abatement Control &
 Compliance

Regulations,
Guidelines I Policies
Solid Waste
 .Salaries £ Expenses
 Abatement Control 4
 Compliance

Regulationsj
Guidelines (, Policies
Resource Recovery
 Salaries & Expenses
 Abatement Control *
 Compliance
 $5,365.3   $6,134,2   $6,614.9   $6,574.0   $6,559.0    -$15.0
$12,773.7  $20,247.0  $19,666.7  $12,358.3  $17,160.0  $4,801.7
   $455.4
   $398.0
   $378.6
   $850.4
  $594.1
  $453.3
  $385.6
$1,133.3

-------
TOTAL:
 Salaries & Expenses
 Abatement Control &
 Compliance

Waste Management
Regulations,
Guidelines 8 Policies
                    HAZARDOUS WASTE

  Waste Management Regulations, Guidelines & Policies

              ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
               1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                          1982       1982       1982            1983 VS 1982

                       (DOLLARS IN THOUSANDS)


            $6,199.3   $7,113.9   $6,614.9   $6,574.0   $6,559.0    -$15.0
           $14,022.1  $21,833.6  $19,666.7  $12,358.3  $17,160.0  $4,801.7


TOTAL      $20,221.4  $28,947.5  $26,281.6  $18,932.3  $23,719,0  $4,786.7
PERMANENT FULL-TIME HQRKYEARS
Regulations,
Guidelines 8 Policies
Hazardous Waste

Regulations,
Guidelines S Policies
Solid Waste

Regulations,
Guidelines & Policies
Resource Recovery

TOTAL PERMANENT HORKYEARS
                                      105.2      112.10      130.5      126.7      116.8      -9.9
                                       11.4       12.8
                                        8.3
                            8.5
                                      124.9      133.3      130.5      126.7      116.8      -9.9

-------
                                           HAZARDOUS WASTE

                         Haste Management Regulations, Guidelines 8 Policies
                                     ACTUAL  JANUARY
                                      1981   ESTIMATE
                                               1982
                   MARCH     CURRENT   ESTIMATE INCREASE +
                  ESTIMATE   ESTIMATE    1983   DECREASE -
                    1982       1982            1983 VS 1982
TOTAL WORK YEARS
Regulations,
Guidelines A Policies
Hazardous Waste

Regulations,
Guidelines 8 Policies
Solid Haste

Regulations,
Guidelines 4 Policies
Resource Recovery

TOTAL WORKYEARS
139.7      158.7      180.3      173.2      157.7     -15.5
 15.6       17.2
 11.3       11.6
166.6      187.5      180.3      173.2      157.7     -15.5

-------
                                 HAZARDOUS WASTE                                                        '  ,|

              Waste Management Regulations, Guidelines and Policies

Budget  Request

     The Agency requests a  total  of $23,719,000 and  116.8 permanent  workyears  for
1983, an increase  of $4,786,700 and a decrease  of 9.9 permananent workyears  from
1982.  Included in this total is $6,559,000 for Salaries and  Expenses  and
$17,160,000 for  Abatement,   Control  and  Compliance.   Salaries and  Expenses  re-
mains stable  from 1982  due  to the  offsetting effects  of  a  reduction  in  per-
manent employees and  increased payroll  costs.   The  $4,801,700 increase in  Abate-
ment, Control  and  Compliance  is  due  to  increased  efforts   in regulatory  review
and economic impact analysis.

Program Description

     The Agency's  hazardous  waste  regulatory,  guidance and  policy-making  activi-
ties are carried  out  under this program  element.  The  solid waste and  resource
recovery programs were phased-out in 1981.

     Regulations,ji.iSuJjj^i.ncs jnd Policies-Hazardous Waste —  This program pro-
videsTormanagement  SI IRe  national   Resource  Conservation and  Recovery  Act
(RCRA) Subtitle  C  hazardous  waste  program.    Included are   the promulgation  and
refinement of  the  criteria  and regulations  for Identification, tracking,  manage-
ment and disposal  of  hazardous wastes.  Technical  studies,  regulatory  impact  and
economic analyses, and  assessments  of control  options and  technologies  necessary
for regulatory  decision-making are  also  covered.   Activities also Include  the
issuance of guidance  to  the Regions and States  for  nationally consistent adminis-
tration of  the Subtitle  C   regulations  as well  as  evaluation of  implementation
policies.

     Regulations. Guidelines and Pglicies-SolidWaste ~ This program provided
for national  management of  tfie  KCEA"SuKt1"t"Te" V  program.    Activities  included
setting guidelines  upon which development  and approval  of  comprehensive  solid
waste management plans  are* based and  guidance  on  implementing the  criteria  for
classification of  sanitary  landfills  and conducting the  Open  Dump  Inventory.

     Regulations. Guidelines and Policies-Re.source Recovery --  This  program  pro-
vided continued national management and  evaluation of  the three-year Urban Policy
local resource  recovery  grant  program  (1979-1981),  development  of   guidelines
for Federal  procurement  of  products  containing  recycled  materials,  evaluation
of industrial  and municipal   resource   recovery  technologies,  and  promotion  of
resource recovery as an industrial waste management alternative.

REGUIATIONS, GUIDELINESANDPOLICIES-HAZARDOUS WASTE

1981Accomplishments

     In 1981, the Agency obligated $18,139,000 in this program including $5,365,300
for Salaries  and  Expenses  and  $12,773,700  for Abatement, Control  and  Compliance.

     In 1981,  EPA  promulgated  Phase  II  technical  standards  for  storage  and
treatment of  hazardous  wastes  in   tanks,  containers,   and  piles,  and  for  in-
cinerators.  EPA  also  issued  temporary  standards  for  new  land  disposal  fa-
cilities to  ensure  sufficient national  disposal  capacity   and  the Agency  pro-
mulgated requirements  for  financial  Instruments  to  adequately  support  closure
and post-closure responsibilities of hazardous waste facilities.

     During 1981,  EPA  instituted  a  general   policy  of  reviewing  all  existing
regulations and  rules under  development  to  ensure  that they  satisfied the  re-
                                       HW-34

-------
quirements of  Executive  Order 12291, the  Regulatory  Flexibility Act,  and  the
Paperwork Reduction Act,  and  that the regulations and  rules also met the  re-
quests of  the Vice-President's  Task Force  on  Regulatory  Relief.   Following
the Phase  II   RCRA  rulemaking,  EPA initiated  regulatory impact,  "degree   of
hazard," and  paperwork  reduction analyses for  use  in  subsequent years in  re-
vising the various Phase II regulatory promulgations.

     In order  to  develop  an  adequate data base  to  support  future §3001  waste
listings or  dell stings  and  §3004 management  standards  tailored  to  specific
wastestrearos. the second year  of the RCRA  industry studies focused on sampling
analyses and development of wastestream-specific profiles of  individual  product
process lines  within  the dyes and  pigments,  pesticides,  and organic  chemical
industries generating significant amounts of  wastes.

     EPA provided training to Regional and State hazardous waste program admin-
istrators, particularly permit  writers,  on  the new regulatory  promulgations.
EPA also established a Program Implementation Guidance  system to provide issue-
specific implementation policy to the EPA Regions and States.   The Agency set up
a RCRA Hotline to aid the regulated community  1" understanding and  complying
with the new regulations and prepared manuals for initial  Interim Authorization
of State programs consistent with the Federal regulatory program.

1982 Explanation of Changes fromJanuary  Budget  Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                  126,381,200     $26,281,600     $18,932,300

     The net  decrease -$7,448,900  results  from several  actions,  as  follows:

     ""  January •-March.  (-51,165,200)  This change represented  a decrease of
     $1,16S,200 from the January budget,  of which $249,900 was for Salaries  and
     Expenses and $915,300  was  for  Abatement,  Control  and  Compliance.  As  a
     result of the  decrease,  the  industrial  waste  evaluation  program,  which
     establishes an extensive information  base  on the  generation,  composition,
     management and ultimate fate of wastes  produced by industry, will  concen-
     trate only on a  limited  number of sectors  In 1982.  Additionally,  travel,
     printing and ADP  services  in  support of  the  hazardous waste management
     program were reduced.

     "  Restructuring.  (+$1,065,600) This Increase reflects  the tranfer of  re-
     sourcesinto this element, as the solid waste and  resource  recovery  func-
     tions of  the Office of  Solid  Waste  are being  phased-out.  The 1982  re-
     sources for these two programs are minimal  and are being consolidated with
     existing hazardous waste resources for improved management and a  accounta-
     bility of all programs.

     "  Reprograpilng.   (-$51,200)   During  the development  of the  operating
     plan, several miscellaneous  reprogramnrings,  which  are  not reportable  to
     Congress, were made  to  this activity and  resulted  in  a net decrease  of
     -$51,200.

     »  Congressional  Actions.   (-$7,298,10d)  A  reduction  of -$5,251,400  was
     taken against the March estimate, reflecting the September 12% reduction to
     the Abatement, Control and  Compliance appropriation.  In 1982,  the Agency
     is undergoing review and  reassessment  of Resource Conservation and Recovery
     Act (RCRA) permitting regulations and their projected Impact on  the  regu-
     lated community.

        An additional  reduction  of  -$2,046,700  was applied to the  Salaries  and
     Expenses ($589,700)  and  Abatement,   Control  and  Compliance  ($1,457,000)
     appropriations to  meet  Congressional 1y mandated  appropriation  levels.
                                      HW-35

-------
     -  Transfer Authority.  (No Change)  The net change applied to this activi-                         }
     ty is made up of a decrease of -5600,000  to Abatement,  Control  and Compli-
     ance and an increase of +$600,000 to Salaries  and Expenses.   This transfer
     will cover the minimal needs for salaries  in  1982.

1982 Program

     In 1982, the Agency Is allocating a total of $18,932,300 and 126.7 permanent
worky'ears to this program, of which $6,574,000  1s  for Salaries  and Expenses and
$12,358,300 is  for  extramural  purposes under  the  Abatement,  Control  and  Com-
pliance appropriation.  These resources reflect the  consolidation  of hazardous
waste, solid  waste  and  resource  recovery  activities  into a  single  program
el ement.

     Extramural funds totalling $2,000,000 support  technical  studies needed for
development of the §3004  technical  standards  applicable to existing  land  dis-
posal facilities.  EPA  is under a Federal District  Court order  to promulgate
the remaining  Phase  11C  technical  facility   standards under  RCRA  §3004  in
February 1982.  The  Agency is continuing to  issue minor technical  amendments
and clarifications to earlier  regulations  of Phase  I and  II  of the  RCRA  pro-
gram, including the  definition of  solid  waste  and the  hazardous  waste mixture
rule.

     The Agency is  continuing five  regulatory Impact  analyses  (RIAs) of the
Phase II  regulations  promulgated  in  1981-82.   The Agency's technical  and  ana-
lytical staff,  with  contractor assistance,  1s conducting the  data  collection,
risk assessment, and  market  analysis  parts  of the RIAs.   EPA  expects to  com-
plete the formulation  of alternatives,  including  any  non-regulatory  choices,
during 1982.  EPA also plans  to  complete calculations  of  costs and  benefits,
impact analyses and  selection of the Agency approach for the hazardous  waste
storage and financial requirements RIAs.

     The Agency will  Incorporate the  initial  findings of  "degree of hazard"
analysis, along with  the  RIAs, In the RCRA regulatory  reform.  This  study  is
systematically cataloging risks  posed  by different management situations, the
costs of controls, and the administrative feasibility of possible  control  tech-
niques.  In 1982,  the study is identifying where EPA can  make appropriate trade-
offs between technological controls placed on the primary types of waste manage-
ment facilities.

     As a part of the paperwork reduction efforts  continuing in 1982,  EPA  will
issue an annual survey to replace the annual report currently required from all
hazardous waste handlers.

     In 1982, the Agency will  continue to establish a comprehensive data base on
the generation, composition,  management,  and ultimate fate  of wastestreams  pro-
duced by the  dyes  and pigments,  pesticides,  and organic chemicals  industries.
As part  of  the RCRA  industry studies,  the Agency  will  analyze 70  pesticide
process product lines, 12-15  dyes  and  pigments lines* and 30  organic chemical
process product lines before  the end  of 1982.

     EPA is giving considerable  attention to providing  guidance to  Regions and
States on RCRA  implementation  policies and  requirements,  particularly  for In-
terim Authorization  of State programs for;the three components  of  Phase II.

     Permit Assistance Teams  will  provide  technical  and procedural  assistance
for development of  Individual  facility permits,  based  on the §3004  technical
standards and EPA's consolidated permits  policy and procedures.

     The Agency 1s concluding solid waste and resource recovery  activities  under
Subtitle D of RCRA  in 1982..   The Agency will  publish the second  Open  Dump Inven-
tory, approve the  State  Solid Waste Management  Plans pending  before  EPA, and
                                     HW-36

-------
issue the final  management guidance to communities awarded Local Resource Recov-
ery Grants between 1979-1981.

1983 Program Request

     The Agency requests a total of $23,719,000 and 116.8 permanent workyears for
this program, of which  $6,559,000 is for the Salaries and Expenses appropriation
and $17,160,000  is  for  the  Abatement, Control  and Compliance  appropriation.
There is substantially  no change in the Salaries and Expenses appropriation from
1982 due to the offsetting effects of a reduction of 9.9 permanent workyears and
increased payroll costs.   The $4,801,700  increase  in  Abatement, Control  and
Compliance is due to increased efforts  in regulatory reform including risk miti-
gation studies and regulatory impact  analyses.

     During 1983, the Agency  will amend all  of the basic §3004 technical facility
standards promulgated  in  1981  and 1982  in preparation  for Issuance 1n  final
form.  The Agency will  complete in-depth regulatory reviews performed  in  1982
and will use these results along with pertinent results from the ongoing  "degree
of hazard" analysis of management options in order  to provide the basis  for de-
veloping major modifications.  The Agency will re-propose the final  regulations
in 1983.  Though  publication of most of the  final  rules will not  occur until
early 1984, this year will conclude EPA's development of  the core RCRA  Phase I
and II regulatory program.

     The program  will  then turn its technical  and  regulatory Impact analysis
efforts to producing §3004 management standards tailored to individual wastes or
industries.  This new  regulatory  approach will  replace  or reduce the  general
regulatory coverage established by the core RCRA regulations over selected In-
dustrial wastestreams.    Data generated through the  RCRA industry  studies  and
the "degree  of  hazard"  cost/risk/controls   feasibility  analysis  will  allow
detailed structuring of tailored §3004 management standards.

     The Agency will  prepare guidance for use by the States and Regions in imple-
menting the Phase II  regulations,  as  amended.   It will  evaluate progress  and
trends in the national  RCRA program,  particularly assumption of program  respon-
sibilities by States,  and Issue improved guidance  documents accordingly.   EPA
will prepare  guidance  for final authorization  of  State  hazardous waste  pro-
grams, and ready  the orientation to  the final regulations  and  permit training
for delivery  1n  1984.    It will  also provide expert  advice on  development  of
difficult individual  permits through  Permit Assistance Teams.

     The Agency plans  to  continue  field evaluation of the  RCRA  Implementation
burden and revising paperwork  requirements  on facilities  accordingly.  In this
effort, EPA Is paying  particular attention  to groundwater monitoring require-
ments in the Phase II regulations.

REGULATIONS. GUIDELINES AMD jpUCIESi-SOLIOASTE

1981 Accomplishments

     In 1981. the Agency obligated $853,400 for this program including $455,400
for Salaries and  Expenses  and $398,000 for Abatement, Control and  Compliance.

     The Headquarters program  concentrated  on national management of the  Open
Dump Inventory  and  publication  of the  first  installment  of  the  Inventory.
States evaluated  the accuracy  of  this  data prior to publication  of the Inven-
tory in 1981.  EPA promulgated a  proposed modification to  the public partici-
pation requirement  for  State planning  guidelines to  provide  more  Input  to
owners and operators of facilities.   The Agency provided comprehensive guidance
on implementation as it approved States'  plans in 1981.
                                      HW-37

-------
     The Agency developed regulations concerning the distribution and marketing
of sewage sludge products under §405 of the Clean Water Act in 1981.  The objec-
tive is to  protect the public from toxic substances  and  pathogens  that may be
present in  some sludges and  to  encourage  resource recovery through  the bene-
ficial use  of  sludge  as a fertilizer or soil  conditioner.   EPA  initiated  a
sludge characterization  study to  supply  information for use 1n the development
of further  sludge  management regulations.  The Agency  also Issued refinements
to the §4004  Criteria  for classification  of  solid waste disposal facilities in
regard to cadmium accumulation.

     In 1981, the  solid  waste activities were phased out.  EPA  is funding the
publication of the second Open Dump Inventory in 1982 through the Hazardous Waste
Management Regulations, Guidelines, and Policies program element.

REGULATIOHS, GUIDELINES AMD POLICIES-RESOURCE RECOVERY

1981 Accomplishments

     In 1981,  the  Agency   obligated  $1,229,000  for this  program,  including
$378,600 for Salaries and Expenses and $850,400 for Abatement,  Control and Com-
pliance.

     Headquarters provided oversight and evaluation of ongoing  Regional  manage-
ment of the Urban Policy grant program to help  selected local  governments com-
plete their feasibility  studies  and  procurement and ore-implementation  activi-
ties for resource  conservation and recovery  projects.  This  included providing
assistance to the  Regions  in refining project  work plans for the  final  phase
and evaluating  the  progress of  second phase projects.   Even  though 1981  was
the last year the  grants were  funded, EPA will  continue to manage  the  final
phases of the projects.

     EPA proposed initial Federal  procurement guidelines for fly ash as a cement
supplement under RCRA §6002.

     In 198.1, the  Resource  Recovery  activities  were phased  out.  The Agency
supported the issuance of final  management guidance and associated grant close-
out activities under the Hazardous Waste Management Regulations,  Guidelines and
Policies program.
                                      HW-38

-------
                                           HAZARDOUS WASTE

                                         Financial Assistance

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS»
Hazardous Waste
Management Financial
Assistance To States
 Abatement Control &
 Compliance

Solid Waste
Management Financial
Assistance To States
 Abatement Control I
 Compliance

Resource Recovery
Local Financial
Assistance
 Abatement Control &
 Compliance
TOTAL:
 Abatement Control &
 Compliance
                                  $26,736.1  $41,700.0  $41,700.0  $41,700.0  $35,136.6 -$6,563.4
                                   $8,252.3   $6,000.0
                                   $4,684.0   $6,600,0
                                  $39,672.4  $41,700.0  $41,700.0  $41,700.0  $35,136.6 -$6,563.4


Financial Assistance   TOTAL      $39,672,4  $54,300.0  $41,700.0  $41,700.0  $35,136.6 -$6,563.4

-------
                                           HAZARDOUS WASTE

                                         Financial  Assistance

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
TOTAL WORK YEARS
Hazardous Waste
Management Financial
Assistance To States

TOTAL WORKYEARS
                                                  90.0
                                                  90.0

-------
                                HAZARDOUS WASTE

                              Financial  Assistance

Budget Request

     The Agency  requests  a  total  of  S35,136,600 for  this  subactivity in  the
Abatement, Control and  Compliance appropriation  for 1983,   This is  a  decrease
of 56,563,400  from  1982.   The"  decrease  reflects the  increasing ability of  the
States to fund their maturing hazardous waste programs.

Program Description

     This subactivity provides  financial  assistance to  State  governments  for
developing and  implementing  hazardous  waste  management programs under  Subtitle
C of  RCRA.   Under  this  subactivity,  the Agency provided  financial  assistance
to States for  solid waste management  programs  and  to local  government  grantees
for resource and  energy recovery projects consistent  with  §4002(a)(2)  of  RCRA.

     Hazardous Waste Management Financial Assistance to States — This program
provides financialassistancetoStatesto"develop,  implement,  and  enforce
programs to monitor and control  hazardous wastes from "cradle to grave" including
generation, transportation,  storage,  treatment,  and disposal.   States  awarded
grants must  either  be  operating a  "substantially  equivalent"  hazardous  waste
program under  Interim  Authorization,  or  working  toward   Interim  Authorization
through a  Cooperative  Arrangement.   State  grant  targets  are  allocated  on  a
formula basis  that  account for a State's  population,  area,  number  of hazardous
waste generators, and the  amount of hazardous waste.  The  grant  amount  is  nego-
tiated based on the target and the portion of the Federal RCRA program the  State
is operating.

     Solid Waste Management Financial  Assistance toj»$ates_—  Through  1981  this
program provided  grants to State  sol id waste raanageieril; agencies .under  Subtitle
D of  RCRA.   The  Agency awarded  grants  on  the basis of  State  population.   The
grants supported  State  solid waste  activities under  RCRA  Including  the  invert
tory of all  solid  waste  land disposal  sites, completion  of State  solid  waste
management plans,  and  implementation  of  State  regulatory  programs  for  the
management of non-hazardous waste.

     Resource Recovery Local  Financial  Assistance — As  part  of the  three-year
UrbanPolicy Program  initiatedin19/9,thisprogram  provides assistance  to  61
grantees undertaking projects  leading  to implementation of resource  and  energy
recovery systems  in  their communities.   This program  received  funding through
1981.

HAZARDOUS WASTE MANAGEMENT FINANCIAL ASSISTANCE TO STATES

1981 Accompl1shments

     In 1981,  the  Agency  obligated   $26,736,100  for  this  program  under  the
Abatement, Control  and  Compliance  appropriation.   The  grant  funds  supported
continued development by  the  States  of  substantially equivalent  legislation  and
regulations required  for  Interim Authorization  of  the States  hazardous  waste
programs, implementation  of  Interim Authorized  (IA)  programs, and  operation  of
delegable aspects of  the  federal  program (manifest, compliance  monitoring, per-
mit evaluation)  through  Cooperative  Arrangements   (CA).    To  achieve   Interim
Authorization,  the States must develop legislation and  regulations  that  regulate
the same wastes,  manage the  same  aspects of  hazardous waste  operations  (genera-
tion, transportation, storage,  treatment, and disposal),  and provide  substan-
tially eouivalent protection to human  health and the environment as the Federal
program.  In 1981,  States were eligible  to  apply  for Interim Authorization  for
                                       HW-41

-------
Phase I -  generator,  transporter,  and Interim  status  standards; Phase IIA  -  per*
mitting of tanks,  containers,  and piles;  and Phase IIB  - permitting of  inciner-
ators.

     Basic guidelines  for  receiving Interim  Authorization  require:  legislative
authority adequate for the  State to carry  out its responsibility for that  phase;
regulations in effect necessary  to  implement the requirements of that phase;  con-
trol over a substantial  majority of  hazardous wastes generated,  transported,  treat-
ed, stored and disposed of in the State;  capacity  to inspect, monitor, and  require
recordkeeping, reporting and monitoring in  order to determine compliance with  the
requirements of  that  phase;  enforcement  capabilities  adequate  to  ensure  compli-
ance with  the  requirements  of  that phase;  and adequate  resources   to  administer
and enforce the  requirements  of that phase.   In 1981, 27 States received Phase  I
Interim Authorization.

     Grant funds  also  support  State operation  of  aspects  of  the Federal  program
in Cooperative Arrangement  States.   States  negotiate  with  Regions  the tasks  the
State will undertake  while  it  works toward Interim  Authorization.   After  final
negotiation of  grants,  both  for Interim  Authorized  and Cooperative  Arrangement
aspects of the  State program,  funds which  the State  cannot expend are  used by
the Region to provide contractor support for implementation  of the Federal  hazard-
ous waste program.

HAZARDOUS WASTE MANAGEMENT FINANCIAL ASSilSTANCE_ JO^ SJATJS

1982 Explanation of Changes  from January  Budget Estimate

                  January          March          Current
                 Estimate        Estimate        Estimate

              $41,700,000     $41,700,000      $41,700,000

     There is no change to this  program  activity.

1982 Program

     In 1982, the Agency is  allocating $41,700,000  for  State  financial   assist-
ance under  the  Abatement,   Control   and  Compliance  appropriation.    States   are
using these  funds  to  continue working   toward  Interim  Authorization  of  their
Phase I  and  Phase  II hazardous  waste programs,  and to  continue   operating  the
Federal program  for  unauthorized  phases  through  Cooperative  Arrangements.   EPA
anticipates that  34  States will  have received  at least  Phase  I Interim  Author-
ization by the end of 1982,  of which 7 will also receive  Phase II author-
ization.

     In 1982, States  authorized for Phase I operate  the manifest system  includ-
ing tracking  of  wastes,  processing  discrepancy/exception  reports,  and  alerting
proper authorities  regarding  lost   or  delayed  shipments   of  waste.   They  also
ensure generator  and  facility   compliance  with   Interim  status  standards.   Un-
authorized States operate aspects of the  Phase I  Federal  program based  on  Region/
State negotiations.   The  States,  through  Interim Authorization  and  Cooperative
Arrangements, are  also  undertaking  various  tasks   of  permitting facilities  under
Phase II.  Cooperative  Agreement  (CA)  States  may be  involved  in   the technical
evaluation of permits.   Interim Authorized  (IA)  States  are  responsible  for  all
aspects of the authorized program.

1983Program Request

     The Agency  requests  a total  of $35,136,600  for this  program   in  the  Abate<-
ment, Control  and  Compliance  appropriation.   This is  a  decrease   of  $6,563,400
1n hazardous  waste  grants  to  States which reflects  the  Increasing  ability of
the States to fund their maturing hazardous waste programs.
                                       HW-42

-------
     In 1983, the  States  will use their Federal  grant funds to  continue  to de-
velop remaining legislation  and  regulations  to be  substantially equivalent  to
RCRA, and  to  apply  for  Interim Authorization  for all available phases  of the
waste program.  Since  all  regulations  are  expected  to  be  effective  1n  1983,
States may  also  be  applying  for final  authorization of  their  program.   Final
authorization requires equivalency with  the Federal program.

     In addition to  CA/IA  State operation of  the Phase  I  program, the  States
will be focusing  resources on permitting  facilities  In  1983 based  on  broad EPA
guidelines regarding  priority facilities.   Priority  facilities  for  permitting
should include  new  and   expanding  facilities,   and  those  facilities  with  the
greatest potential  for causing  severe environmental and public health  problems.
CA States  will  be  eligible,  based on Region/State negotiations, to technically
evaluate permit  applications.   Phase  II   Interim  Authorized  States   will  be
responsible for all  components  of the  program: permit evaluation,  draft  permit
writing, public hearings  and  appeal  procedures, and  final permit issuance.   In
1983, EPA anticipates at least 11 States will  be Phase II  authorized.

SOLID WASTE MANAGEMENT FINANCIAL ASSISTANCE TOSTATES

1981 Accomplishments

     The 1981  resources   obligated  for  solid  waste  financial  assistance  were
$8,252,300 under the Abatement, Control  and Compliance appropriation.   The grant
funds continued to support management of  the land disposal  site  inventory.   EPA
identified and evaluated  the  highest  priority  sites  first,  which is  consistent
with the strategy  developed In  previous years.   The States  continued to oversee
the closing, upgrading, and opening  of land  disposal  sites  within  their  juris-
diction.  This  State activity  continued   to  be the  primary use  of Subtitle  D
grant funds.

     The States completed their solid waste management plans and submitted  them
to EPA for  review  and  approval.   The  States implemented  the  approved plans using
their established legislative authority and  regulatory powers.   The States  con-
tinued to  identify   and  implement alternative  funding strategies  to  assure  an
adequate and  self-supporting   solid   waste management program   in  the  future.

     EPA requested no  resources for  this  program  1n 1982.  The  Agency  operated
this program under a planned  phase-out  of State  grants  in  order to transfer to
the States the responsibility for administration and funding of their RCRA solid
waste programs.

RESOURCE RECOVERYLOCALFIMANCIAL ASSISTANCE

1981 Accomplishments

     The 1981  resources  obligated for Resource Recovery Local Financial  Assist-
ance were $4,684,000 under the  Abatement,  Control  and Compliance appropriation.
The grant  funds  provided  support for  the  completion of  feasibility  studies,
procurement planning, and project development  activities  to improve the  proba-
bility of  successful  implementation  of   resource  and energy  recovery  systems
by participating communities.

     Several projects 1n  the  resource  recbvery grant program  were Implemented
in 1981, including completing the procurement planning stage and moving towards
the selling of bonds to finance the actual  procurement of  the system.

     EPA requested no  resources for  this  program  in  1982.   The  program,  which
EPA initiated In 1979, was a three-year  program  designed  to stimulate local level
resource recovery.   Since EPA  fulfilled  these  initial commitments,  EPA requires no
additional Federal  funding to assure the  successful  implementation of  the re-
source recovery projects by the communities.
                                      HW-43

-------
                                           HAZARDOUS WASTE

                              Waste Management Strategies Implementation

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1903    DECREASE -
                                                 1982       1982       1982            1983 VS 1982

                                              (DOLLARS IN THOUSANDS)
PROGRAM
Hazardous Haste
Management Regulatory
Strategies
Implementation
 Salaries * Expenses
 Abatement Control &
 Compliance

Solid Waste
Management Program
Implementation
 Salaries 1 Expenses
 Abatement Control 8
 Compliance
           $5,912.3   $7,753,6   $7,693.5   $7,135.6  $11,382.9  $4,247.3
           $7,411,1   $2,958.1   $2,958.1   $2,093.7   $1,629.5   -$464.2
           $1,062.1
              $872.6
               $15,0
$60.0
$50.1
-$50,1
TOTAL:
 Salaries « Expenses
 Abatement Control X
 Compliance

Waste Management
Strategies
Implementation
TOTAL
           $6,974.4   $8,626.2   $7,753.5   $7,185,7  $11,382.9  $4,197.2
           $7,411.1   $2,973.1   $2,958.1   $2,093.7   $1,629.5   -$464,2
$14,385.5  $11,599.3  $10,711.6   $9,279.4  $13,012.4  $3,733.0

-------
                                           HAZARDOUS WASTE

                              Waste Management Strategies Implementation

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982

                                              (DOLLARS IN THOUSANDS)
PERMANENT FULL-TIME WORKYEARS
Hazardous Waste
Management Regulatory
Strategies
Implementation

Solid Waste
Management Program
Implementation

TOTAL PEWANEHT WORKYEARS
176.6      195.4      195.4      190.1      264.1      74.0
 27.8       24.7
2.0
1.6
-1.6
204.4      220.1      197,4      191.7      264.1      72.4
TOTAL WORKYEARS
Hazardous Waste
Management Regulatory
Strategies
Implementation

Solid Waste
Management Program
Implementation
219.9      243.3      243.3      235.4      342.3     106.9
 31,2       28.3
2.0
1.6
-1.6
TOTAL WORKYEARS
251.1      271.6      245.3      237.0      342.3     105.3

-------
                                 HAZARDOUS WASTE

                    Waste Management Strategies Implementation

Budget Request

     The Agency  requests  a total  of $13,012,400 and  264.1  permanent  workyears
for 1983,  an  Increase  of $3,733,000  and 72.4  permanent workyears  from  1982.
Included in this  total  is 511,382,900 for Salaries  and Expenses  and  $1,629,500
for Abatement,  Control  and  Compliance  with  an  increase  of $4,247,300  and  a
decrease of  $464,200  respectively.   The increase   in  Salaries   and  Expenses
results from  the incorporation  of  the  Regional   component   of  Hazardous  Waste
Permit Issuance,  formerly a discrete  budget program element,  into this  subac-
tivity.  The decrease in  Abatement,  Control  and Compliance reflects the downward
adjustment in the total  number of facilities  to be permitted.

Program Description

     This subactivity includes  the  hazardous waste Implementation  program  which
incorporates the  Regional activities  necessary  to  oversee,  and  operate  when
required, the  RCRA-mandated  hazardous  waste  program.   Also  included,  through
1982, is the  solid waste  program which involves Regional activities that  enable
States to implement Subtitle D programs.

     Hazardous Wa^te Managemen^Reg^                 Implementation — This pro-
gram incor^rates^the Segionai^activTtiesT necessary to provide guidance to  auth-
orized States,  and to  operate  the RCRA  mandated  hazardous waste  program  in
unauthorized States.   Under Subtitle C of RCRA, Regions  assist States in develop-
ing substantially  equivalent  hazardous   waste management  programs  to  qualify
for Interim Authorization, and fully  equivalent  programs to  qualify   for  final
authorization when available.   Regional  responsibility  includes  operation of  a
Federal program  for  any  program phases,  including  major  technical  evaluation
of facility  permits,  for which  States  have  not  received  authorization,  and
providing review and guidance  to States  operating either authorized programs  or
delegated aspects  of the Federal  program.    State  programs   are  authorized  in
phases:  Phase  I-manifest and  Interim  status standards;  Phase  IIA-permitting
tanks, containers  and  piles;   Phase  I IB-permitting  incinerators; and,   Phase
lie-permitting land disposal  facilities and surface impoundments.


     Solid Waste Management Program Implementation — Solid Waste Management Pro-
gram Implementation includes  Regional  activities  that  increase the  ability  of
States to  implement  solid waste  management  programs under Subtitle  0 of  RCRA.
Until full  assumption by  the  States in 1982  of Subtitle D programs, the  Regions
oversee State procedures  for  conducting  the  Solid Waste disposal  site  inventory
as required under Subtitle D  of RCRA.  The Regions also  assist States In develop-
ing their  comprehensive  Solid  Waste  Management  Plans  and   in  developing  and
implementing the non-hazardous waste regulatory program.  Furthermore,  the Regions
manage the Urban Policy  Resource Recovery grants within their Region and negotiate
grant-funded solid waste activities  with  the  States.

HAZARDOUS WASTE MANAGEMENT REGULATORY STRATEGIES  IMPLEMENTATION

1981 Accomplishments                     ;

     In 1981,   the Agency obligated  $13,323,400  for  this  program,   including
$5,912,300 for  Salaries and  Expenses  and $7,411,100  for Abatement, Control  and
Compliance.

     EPA Regions  assisted the  States  to  develop and  implement  hazardous  waste
programs, including legislative authority, regulatory powers,   and  program  strat-
                                      HU-46

-------
figy* to qualify them  as  eligible  for Phase I  Interim Authorization.   As  of 1981,
27 States had received Phase I Interim Authorization from EPA.

     In 1981,  EPA  personnel  were  responsible  for  the  negotiation  and  award  of
State hazardous waste grants/Cooperative Arrangements  and  provided  guidance  to
States operating RCRA programs under  these  grants.   Through  Cooperative  Arrange-
ments, unauthorized  States  receive  funds  to  operate delegable  aspects of  the
program as EPA's agent while  the  State works toward  Interim Authorization.   The
Agency used  unobligated  State grant  funds to  defray the costs  of  operating  a
Federal program in unauthorized  and/or non-participating States.   These  funds
supplemented the Regions' contractor support funds.

     In 1981,  the  Regions established  a  data base  of  hazardous waste  facility
Part A permit  applications.   EPA  Regions  entered  seventy percent of  the 10,958
bonafide Part A applications  (facilities'  initial application  for a  RCRA hazard-
ous waste permit)  into the system.

     In the  29  States without Interim Authorization,  the  Regions were respon-
sible for the  Phase I  and II programs including  manifest,  interim  status  and
permitting.   In 1981,  EPA permitting activities  in unauthorized States focused
on ranking facilities' Part A applications and evaluating complete  applications
submitted voluntarily  by hazardous  waste  facilities.    EPA  trained  State  and
Regional  personnel   on the  development of  technical  conditions  for  permits.
EPA Regions  operated  the activities  not  delegated to  the  State  through  the
grant/Cooperative Arrangement negotiations.

1982 Explanation of Changes from January Budget Estimate

                  January          March          Current
                 Esjimate       Estimate        Estimate

              $10,711,700     $10,651,600      $9,229,300

   The net decrease  of  -$1,482,400  results  from  several actions,  as  follows:

   -  January - March.   (-$60,100)  This change represented a decrease of $60,100
   from the January budget,  all of which was for Salaries and Expenses.

   -  Reprogrammlng.  {-$184,000)   During  the development of the  operating plan,
   several miscellaneous   reprogrammings,  which are  not reportable to Congress,
   were made to  this  activity and  resulted  in  a  net decrease of  -$184,000.

   -  Congressional Actions.    {-$1,299,900)  A  reduction of -$868,800 was  taken
   against the March  estimate  reflecting the  September  12?   reduction to  the
   Abatement, Control  and Compliance  appropriation.   EPA  and  State  personnel
   will assume the responsibility  for doing Inspections  on generators and trans-
   porters.

      An additional reduction  of -$431,100 was applied to the Salaries and Expenses
   appropriation to meet Congressionally mandated appropriation levels.

   -  TranSfer Authorl ty.  (+$61,600)  The net  increase  applied to this  activity
   Includes  an increase  of  +$61,600 to  Salaries  and Expenses  to fund necessary
   operating expenses.                    <,

1982 Program

     In 1982, the Agency  is allocating  a total  of $9,229,300 and  190.1 permanent
workyears to the program, of  which $7,135,600  is  for Salaries and  Expenses  and
52,093,700 Is  for  extramural  purposes  under  the  Abatement,  Control  and Compli-
ance appropriation.
                                      HW-47

-------
     In 1982, the Regions  are  completing  the entering of Part  A permit  applica-
tion data into the data system and are beginning to call  for Part B  applications.
Part B applications are a  facility's  submission  of a  final  application including
site specific technical  data upon which  the Region/State  evaluates  the  permit.

     The Part B applications are called based on the  permit strategy  of ensuring
adequate treatment and disposal capacity  and the protection  of  public health  and
the environment.  New  facilities are  being  called  in first, followed by:   those
facilities which pose imminent threat to public  health or the environment,  facil-
ities with potential for consolidation  of their  RCRA  and NPDES  permits,  and then
all other facilities.

     The Regions  are also  negotiating,  awarding,   and  administering   grants  and
Cooperative Arrangements based  on the  individual   State's  authorization  status
and acceptance  of delegable activities.  The  Regions  operate  any manifest  and
technical evaluation of permit applications  activities  not  delegated  to  Coopera-
tive Arrangement States.  The Regions use the amount  of  grant  funds unauthorized
States are unable to accept due to their staff and program limitations  to pro-
vide contractor support to help operate the  Federal program.

     In 1962, the Regions  are  concentrating on  assisting States  achieve  various
phases of  authorization.   States  are eligible  for Phase I  and  II during  1982.
Regions are  assisting  States  to  develop   application  packages,  develop  and
strengthen their programs,  and  ensure that  all  Interim Authorized  programs meet
"substantial  equivalence" requirements.  By the end of  1982, the Regions  antici-
pate that  34  States will  have  achieved at  least Phase  I  Interim Authorization,
with 7 receiving Phase II authorization.

     In authorized  States  in  1982,  the  Regions  are  responsible  for providing
guidance and assistance to  the  States as  they operate their authorized  programs
and work  toward subsequent  phases  of  authorization  including   final  authoriza-
tion.  Regional   assistance  activities  include:   technical  guidance to  States
and to  facilities regarding  operation  of  the  manifest  system and  handling  of
exception/discrepancy reports,  monitoring  the  status   of  State  programs,  and
identifying and resolving implementation problems.

     In unauthorized  States, the  Regions  are   conducting  the  Federal  program
including Phase I activities of manifest and interim  status,  and the Phase  II
activity of permit  evaluation.   The  foci of permit  activities in  1982 are  new
and existing  tank,  container,  and pile  facilities  to  ensure  new  capacity  is
available in  a  timely  manner;  and  facilities  with  potential   to  cause  severe
environmental and public health problems.

1983 Program Request

     The Agency requests a total of $13,012,400  and 264.1 permanent  workyears for
this program of which  $11,382,900  is  for  the Salaries and Expenses  appropriation
and $1,629,500  1s for  the  Abatement,  Control  and Compliance appropriation.   This
Is an  increase  of  $4,247,300  and a decrease   of $464,200  respectively.   The
Salaries and Expenses  Increase reflects  increased payroll  costs and the incor-
poration of Regional  resources from the formerly  discrete program element,  Hazard-
ous Waste  Permit  Issuance.   The decrease  reflects  the downward  adjustment in the
total number of facilities to be permitted.

     In 1983, the Regions  will  negotiate  the State hazardous  waste  grants with
Interim Authorized and  Cooperative Arrangement  States.   Cooperative  Arrangement
(CA) States will  act as EPA's agent for delegable  aspects of the Federal  hazard-
ous waste  program.   The Regions will  operate those  aspects  of  the  program  the
States have not assumed.  Emphasis will be  on technically evaluating  and issuing
                                      HW-48

-------
hazardous waste facility permits.  During grant  negotiations,  the Regions and CA
States negotiate  the  division  of  responsibilities  and  funding for  delegable
activities.  The  Regions  will use  grant funds  which the  States are  unable to
expend to provide RCRA permitting assistance through contract support.

     In 1933, the Regions  will assist  States with unauthorized  programs to de-
velop programs  eligible for  Interim  Authorisation, and  to upgrade  programs in
order to achieve  final authorization.   In those States with phases of the program
not Interim  Authorized, the  Regions  will  Operate the  federal  program through
Cooperative Arranqement to ensure active State participation.

     The Regions  will  continue  to provide  assistance and  guidance to  Interim
Authorized States.   In  1983,  the  States will  be operating  under various phases
of authorization  ranging  from Phase  I  only to  a  combination  of Phase  I,  three
components of Phase  II, and possibly final  authorization.  Phase I and II Interim
Authorization must meet "substantial  equivalence"  requirements.   Final  author-
ization requires  an  equivalent program.   We anticipate that  39  States will  be at
least Phase  I  Interim Authorized, with li  receiving  Phase   II  authorization.

     Permitting of facilities  will  continue  to  be a critical  activity  in  1983.
Activities Include permit evaluation, preparing  the draft permit, public hearing
and appeals oroceedings, and  issuing  the final  facility  permit.  Target facilit-
ies will be  new  or  expanding  facilities and facilities  posing severe  threat to
the environment  or  public  health following  RCRA  permit  priorities and proce-
dures guidance. In 1983, the  Regions  will  technically evaluate and  issue an an-
ticipated 1,020 permits in  unauthorized  States.  Cooperative  Arrangement States
will participate  in  permit evaluation.

     Contractor support 1s  available to provide  the Regions additional  tech-
nical  expertise to   evaluate  the  hazardous  waste  facilities.   These  Abatement,
Control and  Comollance resources  allow  for in-depth  technical review  of permit
applications, individual evaluation  of  facilities  and  other permit  assistance
to the Regions in operating the permit program in unauthorized States.

SOL ID HASTE MANAGEMENT; PJOGR AM IHPLENEHTATI ON

1981 Accomplishments

     In 1981, the Agency obligated 51,062,100 for this program under the Salaries
and Expenses appropriation.   The  Regions  continued to negotiate, award,  and ad-
minister the State  solid  waste grants,  and coordinated the solid waste portion
of the annual State/EPA agreements with  other participating programs.

     In consideration  of the  phase-out  of  Federal  Subtitle D  financial  assist-
ance,  the Regions continued to  assist the  States in establishing and implement-
ing adequate and  self-supporting  non-hazardous  waste  programs.  Regional  activi-
ties included:   assisting  States  to  complete  their  solid   waste  management
plan for  submission  to  EPA;   review  and approval  of  the  plans;  and  advising
States on legislation  and  implementation of required regulations.   The  Regions
also assisted  the States  in  Investigating  alternative   funding strategies  to
support the State solid waste management program.

     The management  of the land disposal  site inventory continued in  1981.   The
inventory identifies and evaluates  sites  of. highest  priority and  oversees the
closings, openings,  and upgrading? of sites.  The  Regions  coordinated the Inven-
tory information  with  EPA  Headquarters for inclusion  in  the  annual   national
inventory of land disposal  sites.

     The Regions  continued to  manage  and provide  support  to local   resource re-
covery grantees  as   they  completed their   feasibility studies   and  moved  into
Phase II  orocurement  planning  and   Phase   III  procurement  of  their .systems.
                                       HU-49

-------
1982 Program

     In 1982, the Agency is allocating a total of $50,100 and 1.6 permanent work-
years to this program for Salaries and Expenses.

     As the  State  Solid Waste  Management  Plans  submitted in  1981  are approved,
the Regions  are  providing limited  guidance to the  States to  implement the Plans.
Due to  effective Regional  and  State  coordination  during the  development  of the
Plans, only  minimal  EPA management at  the onset  of  Plan implementation  is  re-
quired.  The Agency is phasing out this program in  1982.
                                      HW-50

-------
                                                         HAZARDOUS WASTE

                                                       Technical Assistance
                                                   ACTUAL
                                                    1981
                                             JANUARY
                                             ESTIMATE
                                               1982
                    MARCH
                   ESTIMATE
                     1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 19B2
                PROGRAM
                                                            (DOLLARS IN THOUSANDS)
a:
x:
i
01
Technology Information
Devel opment
 Salaries S Expenses
 Abatement Control A
 Compliance

Solid Waste
Technology Assistance
Del Ivery-Headquarters
 Salaries & Expenses
 Abatement Control &
 Compl 1 a nee

Solid Waste
Technology Assistance
Delivery-Regions
 Salaries & Expenses
$793.6   $1,278.9
$480.4     $600.0
                                                     $100,2     $233.9
                                                   $3,097,8   $4,393.8
                                                     $378.6
           $416.6
                TOTAL:
                 Salaries & Expenses
                 Abatement Control &
                  Compliance
                                   $1,272.4   $1,929.4
                                   $3,578.2   $4,993.8
                Technical Assistance   TOTAL
                                   $4,850,6   $6,923.2

-------
                                           HAZARDOUS WASTE

                                         Technical Assistance

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME WORKYEARS
Technology
Information
Development

Solid Waste
Technology Assistance
Del 1 very-Headqua rters

Solid Waste
Technology Assistance
Delivery-Regions

TOTAL PERMANENT WORKYEARS
 8.6
 2.5
10.7
21.8
10,5
 3.5
13.0
27.0
TOTAL WORKYEARS
Technology
Information
Development

Solid Waste
Technology Assistance
Del I very-Headqua rters
15.9
 2.6
16.2
 3.5

-------
                                                             HAZARDOUS  WASTE

                                                           Technical  Assistance
                                                      ACTUAL
                                                        1981
        JANUARY
        ESTIMATE
          1982
         MARCH
        ESTIMATE
          1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
                 Solid Waste
                 Technology Assistance
                 Del 1 very-Regl ons

                 TOTAL WORK YEARS
12.8
31.3
14.5
34.2
tn
OJ

-------
                                 HAZARDOUS WASTE

                               Technical  Assistance

Budget Request

     No resources are requested for this  subactivity.   Consistent with the mini-
mal Federal  role  in  guidance  and support  for  State and  local  solid waste  and
resource recovery  activities  and the  increased  responsibility  of  States  for
Subtitle D  implementation,  technical  assistance  in  these areas  was  not  neces-
sary after 1981.

Program Description

     This subactivity  enabled  EPA  to provide  State and  local   governments,  as
well as Federal  agencies, with comprehensive  technical assistance  on hazardous
and solid waste management and resource  conservation and  recovery.   EPA  was also
able to manage a  participatory  public  education and  information program,  and
develop and  provide  technical  information  concerning  implementation  of  RCRA
regulations, policies and programs.   §2006(b)  of  RCRA  authorizes EPA to  estab-
lish Technical  Assistance Panels  for  the purpose  of  providing assistance  to
States, local governments, and Federal agencies upon request.

     Technical Information Development —  This  program  managed   hearings,  meet-
ings and  other public  participationactivities  under  §70Q4(b)  in  the  develop-
ment of all  regulations,  guidelines  and  programs under RCRA.  The  Agency  manag-
ed RCRA orientation  courses for  Federal  and  State  employees.  EPA  also managed
a participatory  public  education  and  information program on  solid  and hazard-
ous waste management  technical  issues, and prepared, published,  and disseminat-
ed reports  to Congress  and  the President.   Other  publications  were also  pre-
pared, as authorized by RCRA §2005 and Subtitle H.

     Sol id Waste TechnologyAssi stance Delivery•> Headquarters —  This program
provided nationalprogram management  includingE?A Headquarters'  establishment
of Regional level-of-effort contracts  for technical  assistance and management of
an evaluation  reporting  system   of  technical   assistance.   Administration  and
monitoring of  peer  matching  technical   assistance  grants   is   also  included.

     Soli d Waste Technology Assi stance Deli very - Reglona1 Offi ces --  This  pro-
gram "provT3e3~legTonal  management  o? IHe technical  assistance  panels  program
for State and local  governments and  delivered  technical  assistance  by  Regional
personnel.

TECHNICAL INFORMATION DEVELOPMENT

1981 Accomplishments

     In 1981,  the  Agency  obligated  $1,274,000  for  this   program,  including
3793,600 for  Salaries and Expenses  and 5480,400 for Abatement, Control  and Com-
pliance,  the  extramural  funds provided  support  for public interest groups par-*
ticipating in the Waste Alert i  program.

     The public education program,  Waste Alert!t continued into  its  final  year.
Maste Alert!  conferences  began forming  coalitions to  serve  as  a corps  to help
.citizens at  the  local   level  understand  solid  waste   management  projects  and
issues, such  as  treatment,  storage  and  disposal   facilities  siting,  resource
recovery, and  the problems of  abandoned  waste sites.  Citizens in all  56  States
and Territories  will  ultimately  be  involved  in  shaping national,   State,  and
local programs and policies concerning waste management.
                                       HW-54

-------
1982 Program

     The requirements of ttris program were completed in 1981.

SOLID WASTE TECHNOLOGY ASSISTANCE DELIVERY - HEADQUARTERS

1981 Accompli shments

     In 1981,  the  Agency  obligated  $3,198,000  for  this  program,   including
$100,200 for  Salaries  and  Expenses and  $3,097,800 for  Abatement,  Control  and
Compliance.  The funds provided expert  contractors  across the country  as Techni-
cal Assistance Panels.   National  management  included  negotiating, awarding  and
monitoring consultant contracts and public interest group  peer  matching grants;
conducting, reporting and  recordkeeping activities; and  evaluating  the  overall
program to  enable  EPA to  ascertain  the effectiveness  and  responsiveness  of  the
technical  assistance provided.

1982 Program

     The requirements of this program were completed in 1981.

SOLIDCHASTE TECHNOLOGY ASSISTANCE DELIVERY - REGIONS

1981 Accomplishments

     In 1981, the Agency obligated  3378,600  for  this program  in  the  Salaries  and
Expenses appropriation.   The  resources  enabled  EPA Regions to continue  coordi-
nating and  administering  the delivery  of technical assistance through  the RCRA
Technical  Assistance Panels program.  This  included receiving and responding to
minor technical  assistance  inquiries,   reviewing   and  evaluating  requests  for
assistance, selecting modes of assistance and developing workscopes.   The Agency
continued to  provide technical   assistance  through  contractor,  peer  matching
and EPA Regional  personnel.

     The Regions  used  Senior Environmental  Employees  in 1981.   They  visited
client communities,  attended  meetings,  monitored  on-going projects, and  super-
vised and coordinated with consultant contractors.

1982 Program

     The requirements of this program were completed in 1981.
                                      HH-55

-------
                                           HAZARDOUS WASTE

                                  Uncontrolled Hazardous Waste Sites

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Uncontrolled
Hazardous Haste Sites
 Salaries & Expenses
 Abatement Control A
 Compliance
 $3,069.9
$19,505.3
TOTAL:
 Salaries 4 Expenses               $3,069.9
 Abatement Control 4              $19,505,3
 Compliance

Uncontrolled Hazardous TOTAL      $22,575,2
Waste Sites
PERMANENT FULL-TI(€ MDRKYEARS
Uncontrolled
Hazardous Uaste Sites

TOTAL PERMANENT WORRYEARS
     44.0


     44.0

-------
c
r
ui
                                                             HAZARDOUS HASTE

                                                    Uncontrolled Hazardous Haste Sites

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   'DECREASE -
                                                                    1982       1982       1982            1983 VS 1982
                  TOTAL WORKVEARS
                  Uncontrolled                           56.0
                  Hazardous Waste Sites

                  TOTAL WORKVEARS                        56.0

-------
                                 HAZARDOUS WASTE

                        Uncontrolled Hazardous  Waste Sites

Budget Request

     The Agency  requests  no funds  in  1983 for this  budget activity.   In  1982,
activities previously funded  under this budget activity are  being funded  under
the appropriation for the Hazardous Substance Response Trust Fund  created by the
Comprehensive Environmental  Response,  Compensation, and Liability  Act of  1980.

P rpgram Descrlpti on

     This activity was an interim  program  to address hazardous  substance  release
problems in a limited way before passage of "Superfund".

     Uncontrolled Hazardous  Waste Sites— This program  addressed the  worst  known
problems associates with uncontrolled hazardous waste sites.  The interim  strate-
gy encompassed  site  discovery  actions,  investigations to determine  the   most
serious sites, emergency  assistance at  those  sites eligible under S311 of  the
Clean Water Act  of  1977,  and  development of enforcement actions under the provi-
sions of the  Resource Conservation and Recovery Act (RCRA).  The Hazardous  Sub-
stance Response Trust Fund  is  now  providing the necessary  funding and  authority
to intensify  efforts  to  undertake  engineering  planning and design  studies  for
containment measures.

UNCONTROLLED HAZARDOUS WASTE SITES

1981 Accomplishments

     In 1981,  the  Agency  obligated  $22,575,200   in  this program,   Including
$3,069,900 for Salaries  and Expenses  and $19,505,300 for Abatement, Control  and
Compliance.

     EPA used contract funding to  provide  major technical assistance and  support
for its efforts.   Investigation  contracts provided the  Regions with  field  per-
sonnel in  order  to  conduct  1,060 preliminary assessments, 700  site inspections,
13 full  field investigations  and  6  general  design studies.   These  resources
also assisted with  enforcement case preparation,  provided  chemical  analyses  in
support of site Investigations and design plans,  and provided engineering  studies
for remedial actions,

1982 Program

     In 1982, this program is  funded under the  Hazardous Substance Response  Trust
Fund.
                                      HW-58

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                           HAZARDOUS WASTE

                                     Hazardous Waste Enforcement

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Hazardous Waste
Permit Issuance
 Salaries & Expenses
 Abatement Control &
 Compl1ance

Hazardous Haste
Enforcement
 Salaries S Expenses
 Abatement Control &
 Compl 1 ance

Uncontrolled
Hazardous Waste Sites
 Salaries S Expenses
 Abatement Control 4
 Conpl 1 ance

TOTAL:
 Salaries S Expenses
 Abatement Control S
 Compliance

Hazardous Waste
Enforcement
           $3,226,3   $4,981.2   $4,004.7   $3,775.1
              $23.4      $24.7      $24.7
                                                      -$3,775.1
TOTAL
           $2,596.4   $4,136.5   $4,616.4   $3,724.1   $1,896.5 -$1,827.6
             $472.3     $455.2     $455.2     $328.9              -$328.9
           $3,627.5
           $1,445.4
           $9,450.2   $9,117.7   $8,621.1   $7,499.2   $1,896.5 -$5,602.7
           $1,941.1     $479.9     $479.9     $328.9              -$328.9
$11,391.3   $9,597.6   $9,101.0   $7,828.1   $1,896.5 -$5,931.6

-------
Uncontrolled
Hazardous Waste Sites

TOTAL WORKYEARS
      HAZARDOUS WASTE

Hazardous Haste Enforcement

ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
 1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
            1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME HORKYEARS
Hazardous Waste
Penult Issuance
Hazardous Waste
Enforcement
Uncontrol led
Hazardous Waste Sites
TOTAL PERHANENT WORkYEARS
TOTAL WORKYEARS
Hazardous Waste
Permit Issuance
Hazardous Waste
Enforcement

95.6 134.8 1D9.3 102. 2 -102. Z
75.6 92.9 103.7 86.3 46.1 -40.2
89.8
261.0 227.7 213.0 188.5 46.1 -142.4

125.9 189.4 163.9 152.0 -152.0
79,8 108.7 122.5 103.1 Si. 4 -51.7
 105.6
 311.3      298.1      286.4      255.1
51.4    -203.7

-------
                                HAZARDOUS WASTE

                           Hazardous Waste Enforcement

Budget Request

     The Agency  requests  a  total  of $1,896,500 and 46.1 workyears  for this pro-
gram in the  Salaries and Expenses  Appropriation.   This represents decreases  of
142.4 workyears,  $5,602,700  In  the  Salaries  and  Expenses  appropriation  and
$328.900 in  the  Abatement.   Control  and  Compliance  appropriation.   This  change
results from the transfer of legal activities to the Office of Legal  and Enforce-
ment Counsel and the consolidation of permit resources.

Program Description

     This subactivity serves to ensure  compliance with  RCRA requirements through
enforcement of Phase I and Phase II hazardous waste  regulations.

     Hazardous Waste Permit Issuance — This  program is part  of the  comprehen-
sive effort  required  ByRCRA  to  manage hazardous  waste.   The  Act  prohibits
treatment, storage  or  disposal  of hazardous  waste  except 1n accordance  with  an
EPA or approved  State  issued permit.  RCRA permits  provide a mechanism  for con-
trolling hazardous  waste  by imposing  performance  standards on  treatment,  stor-
age, and  disposal   facilities.   These  standards,   set  by the  hazardous  waste
management program,  will  ensure  that hazardous waste  is  managed  according  to
environmentally acceptable practices.

     Development of  adequate State  hazardous waste  permit programs   Is  another
significant aspect  of  the permit Issuance program.   RCRA places great  emphasis
on approving State  programs, encouraging  them to issue  permits with  either temp-
orary Interim Authorization, or Full Authorization  if they meet RCRA's  require-
ments.  EPA's  success  In authorizing  State  programs will  affect  the volume  of
permitting done by the Agency.

     As part of  Its continuing  efforts to improve  the regulatory process,  EPA
is consolidating  hazardous   waste  permit  Issuance  procedures  with  four  other
permit programs:  the National  Pollutant Discharge  Elimination  System  (NPDES),
the Underground  Injection  Control   (UIC)  program,  the  Dredge  and  Fill  program,
and the  Prevention  of  Significant  Deterioration   (PSD)  program.    Coordination
and consolidation  of the permitting process  will   benefit both the  public  and
the Agency by reducing delay and simplifying permitting procedures.

     In 1983,  Regional  Hazardous Waste Permit Issuance  program resources  were
combined with  the  Hazardous Waste  Management Regulatory  Strategies  Implementa-
tion program.   Headquarters Permit  Issuance  resources  were   folded  into  the
Regulations, Guidelines, and Policies program.

     Hazardous Waste Enforcement — This  program is  responsible  for the develop-
ment of an  overall  enforcement  strategy,  and the Implementation of a  monitoring
program designed to  ensure  compliance with RCRA Subtitle  C  regulations,  Includ-
ing permit conditions.  EPA  has  also developed procedures  for routine Inspection
and sampling of facilities which generate, transport,  treat, store,  or  dispose  of
hazardous waste.  The Agency 1s developing guidance  which establishes standards
of evidence  needed to  support  enforcement actions  1n  cases  of interim  status
standards violations  and permit  violations.  RCRA  enforcement  will  also  be
responsible for  developing  guidance governing the  issuance of compliance orders
and hearings conducted  to either assess  administrative penalties and/or  suspend
or revoke permits.

     The objective  of  this  program in  1983  is to ensure  compliance with  the
hazardous waste  regulations required by Subtitle C  of RCRA.   Achievement  of this
objective involves:   (1)  ensuring  the technical  enforceabi11 ty of  regulations
                                      HW-61

-------
developed pursuant to  Subtitle  C; (2)  ascertaining  the equivalency  and  effect-
iveness of  State  hazardous  waste  enforcement  programs  developed  pursuant  to
RCRA; (3) conducting RCRA  compliance  evaluations  and compliance sampling inspec-
tions; and  (4)  reviewing selected Federal  and  State permits for  technical  con-
sistency with enforcement policies.

     The technical enforcement program  participates  in  the development  and issu-
ance of:   (1)  §3008 compliance  orders  in  response  to  non-compliance  with  RCRA
hazardous waste  regulations; (2)  §3007  "information  gathering"  letters  to deter-
nine status of particular regulated firms; (3) §3013  compliance orders to require
responsible parties to  assess  conditions  at  a site  or facility;  and  (4) §7003
"imminent hazard"  administrative  orders to induce  responsible parties to clean
up hazardous waste problems at their own expense.

     In addition,  the  technical  enforcement program  is responsible  for  the  re-
view of  "self-reporting" documents from  the regulated  community  and  coordina-
tion with  Superfund  program  personnel  in  the  determination  of  appropriate
remedies.

     The hazardous waste enforcement  program  will assist the  Office of  Legal  and
Enforcement Counsel (QLEC)  in the development of  civil  and criminal referrals as
warranted.

     Uncontrolled Hazardous Waste Sites — Through 1981,  this program dealt  with
the identification and  follow-uo  enforcement  activity associated  with abandoned,
inactive, or uncontrolled  hazardous waste sites.  The  program  implemented auth-
ority under §7003  of  RCRA, which  concerns abandoned,  inactive,  or uncontrolled
sites, to take  remedial  action to prevent  or abate  an  imminent and  substantial
danger to public health or the environment.

     This program  provided  legal  and  technical  expertise  to  present  cases  and
provide training and assistance to States  in  presenting cases.   It also provided
specific legal  and technical  case support activities  in  the course of litigation.

HAZARDOUS HASTE PERMIT ISSUANCE

1981 AccomplishBents

     In 1981,  the  Agency  obligated   53,249,700  for  this  program,  including
$3,226,300 for  Salaries and  Expenses  and $23,400  for  Abatement,   Control  and
Compliance.

     The 1931  hazardous waste   permitting  program  emphasized  the  review  and
approval of  State submissions  for  authorization under §3006  of  RCRA.   Twenty-
seven State programs have  received authorization.  This  program  provided parti-
cipating States  with the authority to  manage portions  of  their hazardous waste
management programs pending development of programs  eligible for  final  authori-
zation.

     EPA continued to  develop strategy  for and provide  assistance  to States  and
Regional offices,  EPA  held a  series  of workshops to provide State and Regional
permitting personnel  with  guidance on hazardous waste permitting  policy and pro-
cedures.

     During 1981,  EPA  began  the  process  of writing  permits  for  voluntary  sub-
missions.  The  Agency  also established teams  of  experts to assist  Regional  and
State permit writers in drafting RCRA permits.
                                      HW-62

-------
                                            6

1932 ^xplanatipn of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                   $5,005,900      54,029,400      $3,775,100

     The net decrease  of -$1,230,800  results  from several  actions,  as  follows:

     *  jan"j*ry. - March-   (-5699,800)   This  change  represented  a  decrease  of
     $699,800 from  Hie"  January  budget,   all   of  which  was  for  Salaries  and
     Expenses.  The 1982  resources  level  will  require the use of most available
     resources to  issue  permits  in  States  without  approved  RCRA  programs,
     resulting in less overview of approved State programs,

     -  Reorganization.   (-5276,700)   These  resources were moved to  Technical
     Support - (Office of Legislation and Enforcement Counsel) (National  Enforce-
     ment Investigation  Center  -  NE1.C).   The  functions  supported  by  these
     resources remain  the  same; the new  program element  for NEIC was  created,
     (a) so that their resources could be more readily Identified and,
     (b) organizationally, the  center  now falls under the responsibility  of the
     Office of Legal and Enforcement Counsel.   As a  result  of an agency  restruc-
     turing these  resources  were  later  moved  to  the Interdisciplinary  program
     under one program element.  This reflects the consolidation of these similar
     activities providing  quick  technical  response  in  emergency  situations.

     -  Reprogrammlng.   (-$8,400)  During  the  development  of the operating plan,
     several miscellaneous reprogramraings, which are  not  reportable to  Congress,
     were made  to  this  activity and  resulted  In  a  net decrease  of  -$8,400.

     -  Congresssional Actipns.  (-$265,200)  A reduction  of -$24,700 was taken
     againstthe Marchestimate reflecting  the September  12% reduction  to  the
     Abatement, Control and Compliance appropriation.

        An additional   reduction of  -$240,500   was  applied  to  the Salaries  and
    Expenses appropriation to meet Congressionally mandated appropriation levels.

     -  Transfer Authority.  (+$19,300) The net Increase applied to this activity
     1nciudes an lncrease of +$19,300  to  Salaries and Expenses to fund  necessary
     operating expenses.

1982 Program

     In 1982, the  Agency is  allocating $3,775,100 and 102.2  permanent  workyears
to this program for Salaries and Expenses.

     EPA is beginning  to implement  its programs to  permit  facilities  that treat,
store or dispose of hazardous waste.  The Agency expects  approximately 100 facil-
ities to receive permits during  the  year in  accordance  with priorities  estab-
lished in EPA's permitting strategy.

     Thirty-four States  are expected to receive Interim  Authorization by the end
of 1982.  The  Agency  is providing the  States  with legal, technical,  and  admin-
istrative assistance to  enable  them  to devel-op permit programs  that  qualify for
full authorization.

1983nProgram Request

     In 1983, EPA is  requesting  resources  for  the  hazardous  waste permit program
under the Hazardous Haste Management Regulatory Strategies  Implementation and the
Hazardous Waste Management, Guidelines and Policies program elements.
                                      HU-63

-------
HAZARDOUS WASTE EHFORCEMENT

1981 Accomplishments

     In 1981,  the  Agency  obligated  $3,068,700  for  this  program,  including
32,596,400 for  Salaries  and  Expenses  and  $472,300 for  Abatement,   Control  and
Compliance.

     During 1981,  the  RCRA Subtitle  C enforcement  program was oriented  toward
enforcing interim  status  standards,  assisting  States  in  the  development  of
"Interim Authorization"  proposals,  and reviewing  resulting  State proposals  for
enforceability and  equivalency.   The  RCRA enforcement  effort also  focused  on
participation in the  regulation development  process and  on  enforcement  policy
devel opment.

     As of September 1981, the Agency has developed two civil enforcement actions
under authority  of §3008.  In  addition,  the  Regional  offices have issued  149
administrative orders assessing $1.1 million  in penalties.  As of September  30,
1981, EPA has completed  compliance  inspections at some 1,980  facilities  and  the
Agency has  reviewed 27  State authorization  submissions  for  enforceability  and
Federal equivalency.

1982 Expl anation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate         Estimate        Estimate

                   $4,591,700       55,071,600      $4,053,000

     The net decrease  of  -$538,700  results  from several  actions,  as  follows:

     "  -jg""^ - March.    (+$1,164,300)  This  change represented an  increase  of
     31,164,300 from the January budget,  all  of  which  was for Salaries  and  Ex-
     penses.  These resources  will be devoted to the growing compliance monitoring
     and enforcement effort needed to  effectively Implement RCRA Subtitle  C  and
     directed to providing effective enforcement policy and guidance  in  the areas
     of compliance  rtonitoring procedures ,  penal ty policy,  and regulations  and
     guidance development.  Continued  improvements will be made to Federal  mani-
     fest compliance monitoring in  non-primacy States implementing the  National
     Manifest System.

     "  KfOWfllzaMo"'  (-5684,400)  The  Agency  moved these  resources to  Tech-
     n i cal  Support - Of f i ce of Legal and Enforcement Counsel (national  Enforcement
     Investigation Center  - MEIC).   The  functions  supported by these  resources

     remain the same.  The new program element for NEIC was  created,  so that  the
     resources could be  more  readily identified and, because,  organizationally,
     the center now  falls under the  responsibility of the  Office  of Legal  and
     Enforcement Counsel.  As a  result  of the  restructuring,  the Agency  moved
     these resources to the Interdisciplinary program under  one nrogram  element.
     This  reflects the consolidation of these  similar  activities providing  quick
     technical  response in emergency situations.
                        (-$190,300)  During the development of the operating  plan,
     several  miscellaneous reprogrammi ngs , to this activity,  which are not report-
     able to  Congress.  They resulted  in a net decrease of -$190,300.

     "  Congressional  Actions.   (-$837,200)  Reductions totalling -$106,300  were
     taken against the March estimate  reflecting the September  12%  reduction  to
     the Abatement, Control  and Compliance appropriation,
                                      HW-64

-------
         Of this $106,300 reduction, Technical support for potential RCRA Subtitle
     "C" judicial actions were reduced by $60,000.  The Agency reduced tech-
     nical evaluation and expert witness support for case development where
     facilities are operating in a manner inconsistent with that prescribed by
     statute.  The Agency made a second reduction of $46,300 decreasing contract
     funds for training of State and municipal employees on the handling of
     hazardous wastes, analysis of hazardous waste samples, and hazardous waste
     site investigations.

         An additional reduction of -5730,900 was applied to the Salaries and Ex-
     penses  {S710.900) and Abatement, Control and Compliance ($20,000) appropria-
     tions to meet the Congressionally mandated appropriation levels.

     -  Transfer Authority.  (+$8,900)  The Agency applied a net increase to
     this activity of +58,900 to Salaries and Expenses.

1982 Program

     In  1982, the Agency is allocating a total of $4,053,000 and 86.3 permanent
workyears for this program of which $3,724,100 is for Salaries and Expenses and
5328,900 for extramural purposes under the Abatement, Control and Compliance
appropriation,  The 1982 program is continuing to focus on interim status com-
pliance  inspections and on identifying major noncoraplying facilities for appro-
priate enforcement activity. Such actions include §3007 information request
letters; §3003 compliance orders and administrative hearings; §3013 monitoring,
testing and analysis orders; and civil actions if necessary.  EPA anticipates
that the 1982 program resources will support some 3,200 compliance inspections
and the use of the other enforcement tools outlined above, as generated by the
inspections.

1983 Program Request

     The Agency requests a total of $1,896,500 and 46.1 permanent workyears for
this program for Salaries and Expenses.  This represents a decrease of SI,827,600
in Salaries and Expenses and 5328,900 in Abatement, Control and Compliance.  This
change results from the transfer of legal activities to the Office of Legal and
Enforcement Counsel.  EPA expects the 1983 Regional technical resources to be
sufficient to conduct 2,950 compliance inspections and to support:  (1) the con-
tinued Issuance of compliance orders and information gathering letters, and
(2) technical assistance in the development of civil  judicial actions, where
appropriate.

UNCONTROLLED HAZARDOUS WASTESITES

1981 Accomplishments

     In 1981, the Agency obligated $5,072,900 for this program, including
$3,627,500 for Salaries and Expenses and $1,445,400 for Abaterient, Control  and
Compliance.  These resources supported a number of cases filed in Federal Dis-
trict Court involving hazardous waste sites which are presenting or may present
an Imminent and substantial  endangerment to public health or the environment.
Of these cases filed, 11 consent decrees have been negotiated, and 10 prelimi-
nary judicial orders have been issued.  These actions have generated approxi-
mately $53 million in completed, initiated or legally-committed site cleanup
financed by responsible parties.  In addition, demand letters have been issued
to responsible parties at 12 potential Superfund sites asking for cleanup by
those responsible and indicating potential  liability for Government costs if
Superfund money is used.

1982Program

     In 1982, this program is funded by the Hazardous Substance Response Trust
Fund.
                                      HW-65

-------
UNCONTROLLEDHAZARDOUSVASTE SITES

1981 Accompli s hments

     In 1Q81,  the  Agency  obligated  $5,072,900  for  this  program,   including
$3,627,500 for Salarfes  and Expenses  and  $1,445,400  for Abatement, Control  and
Compliance.  These  resources  supported a number  of  cases filed in  Federal  Dis-
trict Court involving  hazardous waste  sites  which are presenting or may  present
an inninent and  substantial endangement  to  public   health  or the  environment.
Of these cases  filed,  11 consent decrees  have  been   negotiated, and 10  prelimi~
nary judicial  orders  have  been issued.   These actions  have generated  approxi-
mately S53  million  in  completed, initiated  or  legally-committed   site  cleanup
financed by responsible  parties.   In  addition,  demand  letters  have been  issued
to responsible parties  at  12  potential  Superfund sites asking for cleanup  by
those responsible and  indicating  potential  liability  for  Government  costs  if
Superfund money is used,

1082 Program

     In 1982, this  program  is  funded  by  the  Hazardous  Substance Response  Trust
Fund.
                                       HU-66

-------
Pesticides
   SECTION TAB

-------
Page Intentionally Blank

-------
                                    ACTUAL
                                     1981
                                             PESTICIDES
                    JANUARY
                    ESTIMATE
                      1982
                        MARCH     CURRENT   ESTIMATE INCREASE +
                       ESTIMATE   ESTIMATE    1983   DECREASE -
                         1982       1982            1983 VS 1982
APPROPRIATION
 Salaries 4 Expenses
 Abatement Control &
 Compliance
 Research 4 Development

TOTAL, Pesticides

PERMANENT FULL-TIME HORKYEARS
TOTAL HORKYEARS
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
                                             (DOLLARS IN THOUSANDS}
       $33,197.9  $35,458.7  $32,616.5  $31,238.4  $28,139.4  -$3,099.0
       $29,279.7  $35,633,1  $28,226.9  $22,220.4  $20,534.4  -$1,686.0

        $2,292.2   $1,041,9     $944.7     $279.3   $2,108.2   $1,828.9

       $64,769.8  $72,133.7  $61,788.1  $53,738.1  $50,782.0  -$2,956.1

           887.0      874.1      810.9      744.6      660.9      -83.7
           967.4      993.8      926.2      854.4      744.5     -109.9
       $58,120.1  $68,919.0  $63,320.0  $60,903.5  $57,244.4  -$3,659.1
       $86,935.0
Pesticides
 Salaries & Expenses
 Research 4 Development

 Salaries 4 Expenses
 Research & Development
RESEARCH 4 DEVELOPMENT
TOTAL
        $5,606*7   $6,420.1
        $2,292.2   $1,041.9
$5,606.7
$2,292.2
$7,898.9
$6,420.1
$1,041.9
$7,462.0
$5,930.8   $5,302.1   $4,360.6    -$941.5
  $944.7     $279.3   $2,108.2   $1,828.9

$5,930.8   $5,302.1   $4,360.6    -$941.5
  $944.7     $279.3   $2,108.2   $1,828.9
$6,875.5   $5,581.4   $6,468.8     $887.4

-------
                                    ACTUAL
                                     1981
                                             PESTICIDES
                    JANUARY
                    ESTIMATE
                      1982
           MARCH     CURRENT   ESTIMATE INCREASE +
          ESTIMATE   ESTIMATE    1983   DECREASE -
            1982       1982            1983 VS 1982
                                             (DOLLARS IN THOUSANDS)
Registration, Special
Registration I Tolerances
 Salaries ft Expenses
 Abatement Control A
 Compliance

Standards Setting I
RPAR
 Salaries 4 Expenses
 Abatement Control 4
 Corapl1ance

Federal And State
Program Support
 Salaries ft Expenses
 Abatement Control &
 Compliance

 Salaries * Expenses
 Abatement Control &
 Compliance
ABATEMENT ft CONTROL

Pesticides Enforcement
 Salaries ft Expenses
 Abatement Control &
 Compl1ance
       $12,048.6  $12,387.8  $12,124.1  $11,939.8  $11,842.5
        $1,035.6      $44.7
       $10,960.3  $11,207.2   $9,651.0   $9,200.7   $8,266.2
       $17,106.6  $24,274.1  $16,963.4  $10,968.8  $11,570.7
          $633.3
           $64.4
$540.9
 $50.8
$456.1
$513.7
       $23,642.2  $24,135.9  $22,231.2  $21,654.2  $20,108.7
       $18,206.6  $24,369.6  $16,963.4  $10,968.8  $11,570.7
                                            -$97.3
                                           -$934.5
                                            $601.9
-$513.7
                                         -$1,545.5
                                            $601.9
TOTAL  $41.848.8  $48,505.5  $39,194.6  $32.623.0  $31,679.4    -$943.6
        $3,949.0   $4,902.7   $4,464.5   $4,282.1   $3,670.1    -$612.0
       $11,027.1  $11,263.5  $11,263.5  $11,251.6   $8,963.7  -$2,287.9

-------
                                             PESTICIDES
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE -
                                                1982        1982       1982            1983 VS  1982
                                             IDOLLARS IN THOUSANDS)


 Salaries & Expenses              $3,949.0   $4,902.7   $4,454.5   $4,282.1    $3,670.1     -$612.0
 Abatement Control *             $11,027.1  $11,263.5  $11,263.5  $11,251.6    $8,963.7   -$2,287.9
 Compliance
ENFORCEMENT               TOTAL  $14,976.1  $16,166.2  $15,718.0  $15,533.7   $12,633.8   -$2,899.9

TOTAL PERMANENT WORKYEARS
Pesticides                           111.0      109.1       94.1        79.6        71.7        -7.9
RESEARCH « DEVELOPMENT    TOTAL      111.0      109.1       94.1        79.6        71.7        -7.9

Registration, Special                361.2      334.2      326.2      328.2       303.7       -24.5
Registration S Tolerances

Standards Setting i                  284.6      281.2      251.2      207.6       188.9       -18.7
RPftR

Federal And State                     16.0       14.1       14.1        13.0                  -13.0
Program Support
ABATEMENT 4 CONTROL       TOTAL      661.8      629.5      591.5      548.8       492.6       -56.2

Pesticides Enforcement               114.2      135.5      125.3      116.2        96.6       -19.6
ENFORCEMENT               TOTAL      114.2      135.5      125.3      116.2        96.6       -19.6

TOTAL WORKYEARS
Pesticides                           146.8      151.9      136.9       120.4       103.3       -17.1
RESEARCH S DEVELOPMENT    TOTAL      146.8      151.9      136.9       120.4       103.3       -17.1

-------
                                             PESTICIDES
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE  +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE  -
                                                 1982        1982        1982             1983  VS 1982
Registration, Special                372.9      373.6       365.6       373.5       340.6      -32.9
Registration I

Standards Setting 4                  304.3      301,3       269.3       216.7       195.9      -20.8
RPAR

Federal And State                     17.1       16.0        16.0        14.9                 -14.9
Program Support
ABATEMENT 5 CONTROL       TOTAL      694.3      690.9       650.9       605.1       536.5      -68.6

Pesticides Enforcement               126.3      151.0       138.4       128.9       104.7      -24.2
ENFORCEMENT               TOTAL      126.3      151,0       138.4       128.9       104.7      -24.2

-------
                                    PESTICIDES


OVERVIEM AND STRATEGY

     In 1980,  nearly 1.2  billion pounds  of pesticide  active Ingredients  were
used in  the United  States, roughly  one  quarter  of the  world's total.   These
products create  major  societal  benefits,  such  as  increased agricultural  pro-
ductivity, lower  domestic   food  prices,  a more  favorable balance  of  payments
due to  increased exports  of  agricultural  products, and  control  of human  and
animal  diseases  spread  by   vector  Insects and rodents.  However,  pesticides  are
designed to  be  Injurious  to  living  organisms  and  are deliberately  Introduced
Into the environment  for that  purpose.   Furthermore, most of  these  products  are
used on human or animal  food crops, making human exposure unavoidable.

     The Environmental  Protection  Agency regulates  the  use of pesticides  under
the Federal  Insecticide,  Fungicide,  and  Rodent1e1de Act  (FIFRA), and  Sections
402, 406,  408,  and 409  of the  Federal  Food,  Drug, and  Cosmetic Act  (FFDCA).
FIFRA authorizes  the Agency to  Issue,  deny,  or  revoke the  registration  of  a
pesticide based on a determination of whether 1t will cause "unreasonable adverse
effects," taking into account  the  economic, social, and environmental costs  and
benefits of Its  intended uses.  FFDCA authorizes the Agency to establish,  deny,
or revoke tolerances (I.e., permissible limits)  for  residues of pesticides  in or
on food and feed crops.

     The major  environmental  goal  of the program is to ensure  that  pesticides
registered for  sale  and use  in  the  United States  will  achieve  their  Intended
function without unreasonable  adverse effects on human  health and environmental
duality.  Activities 1n  support of this  goal  focus  on  the  evaluation and mitiga-
tion of  risks  to human  health, as  well  as  unintended  adverse effects  on  fish,
wildlife, domestic animals, plants, rivers, lakes,  etc.

     FIFRA, in  essence,  provides for  Agency control  of the terms and conditions
under which pesticides can  be  legally used through the issuance of registrations
(or conditional registrations pending submission by the applicant of all  required
data) to permit marketing of specific pesticide products; experimental use permits
to allow field  testing  to   obtain data  required for registration;  and emergency
exemptions to  allow  temporary unregistered pesticide  uses to control  critical
pest infestations.  Before  a pesticide  can  be  registered for  use  on a human food
or animal  feed  crop, the Agency  must either establish  a  tolerance or  grant an
exemption from the tolerance requirement.

     Registration activities by  the  the States are authorized  under  FIFRA to
register pesticides for  special local  needs within  their respective jurisdictions
and to grant experimental  use permits to allow the development of data to support
these registrations.   State registrations are subject  to  review  by  the Agency.

     Re registration, required  under  FIFRA, calls  for  the  Agency  to  reevaluate,
based on current scientific  standards,  all  existing  registrations  and to  re-
register those  pesticides  found to  meet the  "no  unreasonable adverse  effects"
standard.  In many instances,  reregi strati on  will  be contingent  upon  submission
by registrants  of new or  additional  scientific data, usually  data that  were  not
required when the  product   was originally  registered.   Registrants  may  also be
required to make changes in such areas as  label precautions and  instructions or
packaging.

     Registration standards  are being   developed  by  the   Agency to  facilitate
pesticide registrations   and reregistrations  as  expeditiously as possible,  in
accordance with  the  FIFRA  mandate.    In  the  past,  the  registration  process
entailed an examination of  risk for  each product,  one at  a  time.  Registration
standards provide a  single, comprehensive  risk/benefit  evaluation of the  basic
active ingredient  chemicals  common  to  numerous   products.    For  each  active
ingredient, safety criteria and other  standards  are set  as  conditions  for  the
                                        P-5

-------
registration and reregistration  of  products.   Review of basic  health  and  safety                    ,    •,
data will  thus  be needed  only  once  for numerous products  containing the  same                        • 1
active ingredient.

     A Rebuttable  Presumption  Against  Registration   (RPAR)  is  the  process  the
Agency may  take  under FIFRA to cancel,  suspend, or restrict  the  registration
of a pesticide  whenever  it is  suspected of causing  unreasonable  adverse  health
or environmental effects.  The Agency has establised  risk  criteria which,  if met
or exceeded, trigger  a RPAR  involving a comprehensive review of the pesticide's
risks and benefits.  The process involves .-a review of alternative,  less hazardous
chemicals that  could  be  substituted  for those  in RPAR and  consideration  of  a
full  range  of  regulatory  options  that  could  allow  the  chemical  to  remain on
the market under specific conditions.   These options  include changes  in labeling,
classification and  use  restrictions.   The  RPAR decision  presents  the  best
balance of  risks and  benefits consistent  with  the   Interest  of  public health,
safety, and the  environment.   Agency decisions  resulting  from the  RPAR process
are subject to  review and comment  by  the U.S. Department of Agriculture  (USDA)
and a FIFRA Scientific Advisory Panel.

     The pesticide  enforcement  program  monitors  and enforces  compliance  with
FIFRA requirements largely through  cooperative agreements  with  State  and  Terri-
torial  agencies, to  which the  Agency provides  enforcement grants.   Compliance
and enforcement  activities  are  mainly  intended  to  ensure  that pesticide  users
comply with label  directions  and   that  pesticide producers and  sellers  comply
with registration, classification,  and labeling  requirements.   The  Agency  also
provides funds to the USDA to help  support training for applicators of restricted
use pesticides,  primarily farmers,  and grants  to  States and Territories to  defray
the costs of certifying applicators.

     The pesticides research  and development  program 1s  designed to  reinforce
the Agency's ability  to  evaluate the  risks and  benefits  of  pesticides  and to
ensure that the  Agency's regulatory  actions  are based on  data that are  scien-
tifically sound  and legally defensible.   A significant aspect of this activity is
the development  of testing protocols  to guide  industry  in  generating data to
support pesticide  registrations and   registrations.   Information  from  this
program is made  available to the general public  and to Federal,  State, and local
government officials  for use  in fulfilling  their  respective  responsibilities
for regulatory enforcement and  In responding to pesticide emergencies.

     Program priorities  it)  1983 will  Include:  elimination  of  backlogs  in  the
registration and tolerances programs; the  reduction  of time and effort required
to review  registration applications and tolerance petitions;  and the  reduction
of time needed  to  review scientific  data  leading to sound scientific  judgments
on FIFRA Issues.   Th^s  will  lead to  reduced  costs for both  the  Agency and the
industry.

     Exempting selected  types  of pesticide products   or chemicals  from the  full
application of  FIFRA  regulations will  be  emphasized wherever  possible  on  the
basis of  adequate  public  health protection.   Examples  Include minor uses  and
relatively safe  pesticides.

     An improved working  relationship with  the industry will  be created through
increased consultation with  registrants and  applicants during  the  review  pro--
cesses, early   screening   of  data to  identify  problems  for  timely  resolution,
greater efforts  to achieve negotiated settlements rather than  the use of  rigid
administrative approaches with respect  to  pesticides suspected  of posing  unrea-
sonable risks,   and closer  industry  involvement  in  data  evaluations  and  the
development of registration standards.

     Review processes  will  be  streamlined to  obtain  (1)  strict adherence to
legislative and   administrative  deadlines,  (2)  improved monitoring  of decision
processes, (3)   more  efficient  reviews   of  clusters   of chemicals with similar
uses, (4) elimination of non-essential  reviews,  (5)  reduced scope and  increased
                                      P-6

-------
selectivity of literature searches,  (6)  greater use of high quality reviews made
by other United States  and  foreign  organizations, and  (7)  revised criteria for
presumptions against registration  that more  closely reflect likely  risk.
                                       P-7

-------
                                PESTICIDES


SUMMARY OF INCREASESAND DECREASES                     (1nthousands of do!Tars)

     1982 Pesticides Program	        $53,738.1

        Salaries and Expenses....	         -3,099.0

        The net decrease reflects  the  personnel  reduc-
        tions associated with  streamlining the  regis-
        tration process, shifting enforcement responsi-
        bilities to the States,  and completion  of in-
        house research efforts  in health exposure ex-
        periments.

        Research and Development.......	         +1,828.9

        The net  increase  reflects  a   joint  research
        effort with the  Department of Labor  to  ascer-
        tain the health effects  of young farm  workers
        who are exposed to  pesticides,  and  to validate
        laboratory devived  exposure  data under  actual
        use conditions to  support the  registration  of
        pesticides.

        Abatement, Control  and Compliance...	         -1,686.0

        The net decrease reflects improvements in State
        priority setting to allow  a  decrease   in  the
        State grant program, and States will be encour-
        aged to raised or  implement  fees to offset the
        decrease in Federal  support  of  certification
        and training of  applicators  of  restricted use
        pesticides.

     1983 Pesticides Program	        S50,782.0


SUMMARY OF CHANGES TO JANUARY 1982 BUDGET ESTIMATE

                                                       (in thousands of dollars)
     January 1982 Estimate	         572,133.7

        January-March.	.	         -10,064.9

        Reorganization	            -280.7

        Repr ogrammi ngs	            -129.6

        Congressional  Actions	          -7,938.4

        A decrease of $5,331,500 to  Abatement,  Control
        trol and Compliance and a  decrease  of $661,900
        to Research and Development  were  taken  against
        the March estimate to reflect the  September 12S
        reduction.  Congress also  restored  $1,0.50,000
        to the Abatement,  Control and Compliance appro-
        priation for Pesticides Cetificatlon and Train-
        Ing.  An  additional  reduction  of  $2,995,000
        was applied to the Salaries and Expenses
                                        P-8

-------
                                                 (in thousands of dollars)
   ($1,720,000) and  Abatement,   Control  and  Com-
   pliance ($1,275,000) appropriations to meet
   Congressionally nandated appropriation  levels.

   Transfer Authority	,....,.,	             +18.0

   A net  increase  of  $18,000  was  transferred  to
   this program as follows: $450,000 was transfer-
   red from  Abatement,  Control   and  Compliance;
   $3,500 was transferred from Research and Develop-
   ment; and $471,500  was  transferred to Salaries
   and Expenses.

Current 1982 Estimate	         $53,738.1
                                   P-9

-------
                                      PESTICIDES

                                                                    Increase +
                                     Budget     Current               Decrease -
                             Actual   Estimate   Estimate  Estimate    1983 vs.
Program Activities            1981     1982       1982      1983	1982
Registration Standards
Registration Standards
Completed. 	 	
RPAR
PI nal RPAR Decisions.....
Laboratory Data Audits...
Regl stratiqn
New Chemical and Blora-
tional (environmentally
protective pesticides)
Revi ews ...........
Old Chemical
Amended Registration
Special Registration
Emergency Exemption
Experimental Use Permit
24(c) State Registration
Revi ews ., 	
Temporary Tolerance
Peti ti ons 	 	
Tolerances
Tolerance Petition
Reviews. .................
Inert Ingredient
Request Reviews 	 	

18
11
4
142
7 673
22,736
450
434
1 424
109

371
73

8
10
21
95
5,300
22,200
350
240
1,200
135

310
40

14
10
10
185
7,550
20,000
370
465
1,040
120

345
35

15
6
18
130 I/
6.000 I/
18,000 I/
400
490
1,100
140

400
35

+1
-4
+8
-55
-1,550
-2,000
+30
+25
4-60
+20

+55

                                       P-10

-------
Enforcement


  Establishment Inspections  2J   2,825   4,700     3,053     2,285        -768

  Use/Reentry and Experi-
  mental Use Observations..  27  10,921   9,200    11,860     9,221      -2,639

  Market Place
  Investigations	,  2/   7,462  11,500     8.107     6,326      -1,781

  Import Inspections..	  2/     241     500       200        80        -120

  State  Applicator License and
  Record Inspections	      10,928  11,000    11,912     9,530      -2,382

  State Dealer Record
  Inspections	       6,937   7,500     7,561     6,049      -1.512

  Federal Laboratory Inspections      4      10        12        40         +28
I/  1983 outputs reflect a reduction in the average number of reviews per
    chemical  and the elimination of the backlog.

2/  Includes both Federal  and State enforcement activities.
                                      P-ll

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                              PESTICIDES

                                        Pesticides Hon-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Scientific Assessment
 Salaries & Expenses
 Research & Development

Technical Information
4 Liaison
 Salaries & Expenses
 Research & Development

Monitoring Systems 4
Quality Assurance
 Salaries & Expenses
 Research 4 Development

Health Effects
 Salaries 4 Expenses
 Research S Development

Environmental
Processes * Effects
 Salaries 4 Expenses
 Research 4 Development
  $320.0
  $128.2
   $92.0
    $3.5
$428.6
 $87.8
  $3.5
$365.1
 $56.8
  $3.5
$365.1     $264.0   -$101.1
            $15.5     $15.5
 $60.3
$21.2    -$39.1
  $482.3     $694.2     $631.5     $526.1     $484.5    -$41.6
   $34.0      $60.0      $58.8      $58.8     $235.0    $176.2
$2,140.1   $2,478.1   $2,342.3   $2,011.3   $1,260.0   -$751.3
  $207.7     $226.5     $220.5     $220.5   $1,240.9  $1,020.4
$2,572.3   $2,731.4   $2,535.1   $2,339.3   $2,330.9     -$8.4
$1,918.8     $751.9     $661.9                $616.8    $616.8

-------
                                              PESTICIDES

                                        Pesticides Hon-Energy
                                     ACTUAL
                                      1981
            JANUARY
            ESTIMATE
              1982
         MARCH
        ESTIMATE
          1982
        CURRENT   ESTIMATE INCREASE +
        ESTIMATE    1983   DECREASE -
          1982            1983 VS 1982
TOTAL:
 Salaries & Expenses
 Research & Development

Pesticides Non-Energy   TOTAL
                                              (DOLLARS IN THOUSANDS)
$5,606.7   $6,420.1   $5,930.8   $5,302.1   $4,360.6   -$941.5
$2,292.2   $1,041.9     $944.7     $279.3   $2,108.2  $1,828.9

$7,898.9   $7,462.0   $6,875.5   $5,581.4   $6,468.8    $887.4
PERMANENT FULL-TIME WOROEARS
Scientific Assessment

Technical Information
8 Liaison

Monitoring Systems *
Quality Assurance

Health Effects

Environmental
Processes 8 Effects
     6.6

     2.1


    12.6


    33.3

    56.4
 9.5

 1.6


12.0


31.0

55.0
 7.5

  .6


10.0


27.0

49.0
 6.2

  .2


 6.2


20.0

47.0
 4.5




 6.0


17.0

44.2
-1.7

 -.2


 -.2


-3.0

-2.8

-------
                                              PESTICIDES

                                        Pesticides Men-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1962       1982            1983 VS 1982
TOTAL PERMANENT WORKYEARS
TOTAL WORK YEARS
Scientific Assessment
Technical Information
8 Liaison
Monitoring Systems «
Quality Assurance
Health Effects
Environmental
111.0 109,1 94.1 79.6 71.7 -7.9

8.5 14.0 12.0 9.7 5.5 -4.2
2.5 2.1 1.1 .7 -.7
13.1 13.4 11.4 7.6 7.1 -.5
43.3 43.3 39.3 32.3 29.2 -3.1
79.4 79.1 ' 73.1 70.1 61.5 -8.6
Processes & Effects

TOTAL WORKYEARS                       146.8      151.9      136.9      120.4      103.3     -17.1

-------
                                    PESTICIDES

                                Pesticides  Non-Energy

Budget Request

     The Agency requests  a  total  of $6,468,800 and 71.7 permanent  workyears  for
1983, an  increase  of $887,400  and a  decrease  of  7.9  permanent workyears  from
1982.  Included  in  this total  is  $4,360,600  for  Salaries  and  Expenses  and
$2,108,200 for  Research  and  Development,  with  a  decrease  of  $941,500 and  an
increase of  $1,828,900,   respectively.   The  decrease reflects  a  reduction  of
in-house efforts  in conducting pesticide  exposure  assessments and  publishing
pesticides research  summaries.   The  increase will  provide  additional  research
support for the pesticides registration program.

Program Description

     The Pesticide  research program  is  a  result  of detailed  coordination  and
planning with  the  regulatory program.   It  is  designed  to  support  the  Agency
and States  In  the  implementation  of  the  Federal  Insecticide,  Fungicide  and
Rodenticide Act  (FIFRA)  and the  Federal  Food,  Drug  and  Cosmetics  Act  (FFDCA).
The program  develops,   validates  and documents  procedures  for  measuring  and
predicting human and environmental  exposures to pesticides.   The  program  also
measures and documents exposure effects under various environmental  circumstances
and pesticide  usages.  The  program also provides quality  assurance support  for
Agency measurements  involving  pesticides.   The   components  of  the program  are
integrated Into an  overall  research  effort  designed  to  produce outputs  clearly
focused on Agency regulatory needs in this area.   Priority  research  needs Include
development of  environmental  and health testing  protocols (which  manufacturers
must use In  order  to provide data to  register a  chemical), development of analy-
tical  models  to predict environmental  exposure  and  effects,  rapid  toxicity
testing for regulatory  decisions, and quality assurance  support.

SCIEKTIFICASSESSMENT

1981 Accomplishments

     In 1981,  the  Agency used  a total   of  $448,200 for this  program, of  which
5320,000 was under the Salaries  and Expenses appropriation and $128,200  was  for
extramural research  purposes  under the  Research  and Development appropriation.

     In 1981, the program provided health and risk assessments for careInogenicity
and mutagenicity for pesticides  that  are  undergoing RPAR  (Rebuttable Presumption
Against Registration) and registration analysis in  the  Office of Pesticide  Pro-
grams (OPP).  The  assessment  work  also Included review and justification before
the Agency's Science Advisory Panel  and in  legal  defense  situations.    Research
efforts were initiated  to develop  risk  assessment  guidelines pertaining  to  the
reproductive effects of  pesticides.   These guidelines were  used for  regulatory
purposes.

1982 Explanation of Changes  .from...January  Budget  Estimate

                    January           March             Current
                    Estimate         Estimate         Estimate

                    $428,600         $365,100         $365,100

     The net decrease  of -$63,500  results   from  several  actions,  as  follows:

     - January - March.    (-$63,500)    This  change   represented   a  decrease   of
     $63,500 from the January budget for Salaries  and  Expenses.   This  decrease
     resulted in somewhat  reduced  support  for  cancer  assessments, mutagencity
                                      P-1S

-------
                                   REVISEDP-16

     and reproductive toxlcity  reviews.  This trill also decrease  the  literature
     search capability.

1982Program

     In 1982  the Agency  1s  allocating a  total  of $365,100  and 6.2  permanent
workyears to  this program,  all  of  which  is  under  the Salaries and  Expenses
appropriation.

     In 1982, the program will continue  to  provide health  and risk assessments
for carcinogenic  and mutagenlc toxlcity  for those chemicals  Identified by  the
Office of Pesticide Programs,  The assessments will be defended as needed before
the Science Advisory  Panel  and other Agency  review forums.   Work will  continue
In 1982  on developing  guidelines for  evaluating reproductive toxldty  with  a
peer review milestone slated  for late 1982.  This activity assures  that pesticide
decisions reflect risk  assessments  consistent with Agency requirements, pursuant
to the legal mandates of FIFRA.

1983Program Request

     The Agency requests a total of $279,500 and 4.5 permanent workyears for this
program of  which  $264,000 1s  under  the Salaries and Expenses appropriation  and
$15,500 1s  for  extramural  research  purposes  under the  Research and Development
appropriation.  This  reflects  a decrease  of $101,100 and an  Increase of $15,500,
respectively.  The decrease  Is the result of preliminary estimates of  a  reduced
need for In-house risk  assessment support  required by  the  Office of  Pesticides
Programs, based on streamlined Rebuttable Presumption  Against Registration  (RPAR)
procedures designed  to  minimize resources required for  the  full  RPAR  process or
adjudlcatory hearings.

     In 1983, the program  will  provide  three  types  of outputs for  use by  the
Office of  Pesticide  Programs:  cardnogenlcity   risk  assessments, mutagenldty
risk assessments, and review and defense of these assessments before the Agency's
Pesticide's Science Advisory  Panel and 1n legal proceedings.

     The work on  developing risk assessment guidelines begun  In late 1981  will be
completed with the expected Issuance  of guidelines for pesticides and other Agency-
wide use.  These  activities support  the implementation of FIFRA by the  Office of
Pesticide Programs.

TECHNICAL INFORHATIOH AMD LIAISOH

     Refer to  the  Oxldants  Non-Energy  narrative  for  a  description  of  those
Technical Information  and  Liaison  activities that are  common to all  research
and development   budget  sub-activities.   Activities   specific  to this  budget
sub-activity are  Indicated 1n the program element description below,

1981 Accompli shments

     In 1981  the Agency  used  a  total  of  $95,500  for this  program  of  which
$92,000 was  under the  Salaries and Expenses appropriation  and $3,500 was  for
extramural purposes under the  Research and Development appropriation.

Specific accomplishments  included:

     -  Provided  the Manual gf Analytical Qua111y Control for Pesticides in
        Human and Environmental^ Media to state and other 'public health
        laboratories.

     -  Developed analytical  reference  standards  and supplemental   data  for
        pesticides and  other  organic compounds.  These  standards are used  by
        the states to check the accuracy of their analyses.

-------
     -  Compiled  a  document  concerning  the  behavior  of  DDT  and  Kepone  fn
        sediment and  water systems.   The  document 1s  part  of an  investigation
        of a  feasibility   study  concerning the  removal   of  in-pi ace toxic  sub-
        stances.

1982 Explanati on of Changes from January Budget Estimates

                    January          torch            Current
                    Estimate         Estimate         Estimate

                    $91,300          $60,300          $60,300

     The net  decrease of  -$31,000  results  from  several actions,  as  follows:

     "  January - March.   (-$31,000)   This  change  represented  a  decrease  of
     531,000 from the January budget, all of which was for Salaries and Expenses.
     This decrease  resulted  in  the  elimination  of  Regional liaison  activities
     for this program as well as a reduction  of the  number of technical  Informa-
     tion publications to be prepared and disseminated.

     '  Transfer Authorlty.  (Mo change)  The net change applied to this activity
     is made up of  a  decrease  of -$3,500 to Research and Development and an  in-
     crease of  +53,500 to  Salaries  and Expenses.   The  Salaries and  Expenses
     increase will  fund essential day-to-day operating expenses.

1982 Program

     In 1982, the  Agency  is allocating  a  total  of $60,300  to  this  program,  all
of which is under the Salaries  and Expenses appropriation.

Planned accomplishments Include:

     -  Provide  a  report on environmental  exposure assessment of  pesticides  to
        the Office of Pesticide Programs.

     -  Provide  toxicological  assessment  reports on  various  pesticides to  the
        Office of Pesticide Programs.  These reports will be used for registration
        purposes.

1983Program Request

     The Agency  requests  a total of $21,200 for this program, all  of which  is
under the  Salaries and  Expenses appropriation.   This  reflects  a  decrease  of
339,100.  The  reduction  will   result  In   some  delays   in  publishing  research
summaries that describe  the  results  of completed  pesticide research  projects.
These summaries  are  distributed to  State  and  local  officials,  agricultural
organizations, and pesticides manufacturers.

     In 1983, the Technical Information and Liaison program will stress providing
the necessary technical information  to State and local  officials  in support  of
their increased role in administering environmental  programs.

Projected accomplishment include:

     -  Conduct seminars and conferences for State and local  government officials
        and industrial personnel on the  following subjects:  field  application  of
        certain pesticides, exposure effects on  humans  and  on other  non-target
        organisms, and ecological impact of selected  pesticides.

     -  Provide  research  summaries  pertaining  to  completed pesticide  research
        projects to  State  and  local  governments  and  to   the general public.
                                      P-17

-------
MONITORING SYSTEMS AND QUALITY ASSURANCE

1981 Accomplishments

     In 1981, the  Agency used  a total   of  $516,300 for  this  program, of  which
$482,300 was under  the Salaries and Expenses appropriation  and $34,000 was  for
extramural research  purposes  under the  Research  and Development  appropriation,

     In 1981, this program provided support to the Agency  and States  1n maintain-
ing a quality assurance  program  to  ensure accurate  data for  regulatory decisions
and enforcement  actions  under  the FIFRA.   Approximately  1,000 Environmental
Protection Agency (EPA),  and other Federal,  State, local,  Industrial,  academic
and foreign laboratories were furnished pesticide reference  materials  - approxi-
mately 28,000 samples were distributed from the  850 reference compounds currently
stocked.  These  samples  were used  for quality  assurance  testing  and  quality
control purposes to ensure 1ntercomparab1l1ty of  data from  different laboratories.

     In addition, collaborative  quality  assurance studies were  carried out  be-
tween volunteering laboratories.  The quality control of  analytical  supplies  was
maintained through a  rigorous acceptance testing  program prior to  distribution
to other laboratories.

1982 EypJj^atjog.^of^C.hanggs from January Budget  Estimate
                    January          March            Current
                    Estimate         Estimate         Estimate

                    $754,200         $690,300         $584,900

     The net  decrease  of  -$169,300 results  from  several  actions,  as  follows:

     " _J..a"ua.r.y " March.   (-$63,900)   This  change  represented  a  decrease  of
     $63,000 from  the  January  budget,  of  which $62,700  was  for Salaries  and
     Expenses and $1,200 was for  Research and Development.   This decrease  resul-
     ted In the special synthesis program for specific chemicals.

     ~  Deprogramming.   (-$21,100)  {This reprogrammlng of -$21,100  was  Included
     1n the letter  to  Congress on December  16,  1981).  This Agency-wide  repro-
     grammlng provides  resources  for  transfer  of the accountability function to
     the Office  of  Management  and  Evaluation and,  In  addition,   provides  addi-
     tional  resources  for  the  Immediate  Office  of  the Assistant Administrator
     for Solid Uaste and Emergency Response.

     -  Congressional Actions.  (-$84,300)   A reduction of  584,300 was applied
     to the Salaries and Expenses appropriation  to meet Congressional ly  mandated
     appropriation levels.

1982 Program

     In 1982,  the  Agency  1s  allocating  a total  of   $584,900 and 6.2 permanent
workyears to this program,  of  which $526,100 1s  under the Salaries  and  Expenses
appropriation and $58,800   is  for  extramural  purposes  under the  Research  and
Development appropriation.

     In 1982, this  program continues quality assurance activities In support of
FIFRA regulatory decision and enforcement. ' A major part of this will be  mainten-
ance of the repository  of pesticide calibration materials which will be distributed
to approximately 1.000 EPA, other Federal, State, local,  academic,  Industrial and
foreign laboratories.  These materials are  used  by the laboratories to  maintain
Internal  quality control  to ensure  that their  data  are  accurate,  precise and
reliable.

     Also, in order  to Improve  consistency  of analysis, the program serves as  a
                                     P-18

-------
central supply of special reference materials used in the gas chromatographic an-
alyses by the Office of Pesticide  Program's cooperative epidemiology laboratories.

1933 Program Request

     the Agency requests a total of $719,500 and 6.0 permanent workyears for this
program, of which  $484,500  is under the Salaries and  Expenses  appropriation and
$235,000 is  for extramural  purposes  under the  Research and Development  appro-
priation.  This  reflects a  decrease  of  541,600 and  an  increase of  $176,200,
respectively.  The  decrease  results  from  in-house savings due  to  re-location of
the pesticide repository  facility.   The increase will  be used  to  employ outside
technical experts to Improve quality assurance procedures-

     In 1983, this  program will maintain the pesticides quality assurance activi-
ties in support  of  the FIFRA registration and enforcement.  The funds  will  con-
tinue to be used to support the pesticide repository  which  distributes standard
analytical reference  samples to EPA, other Federal  laboratories,  and contractor
laboratories working for Federal agencies.

     The major  activity under  this  program  will continue  to  be  maintenance of
the repository  of  high priority pesticide calibration  materials,  which will  be
distributed to approximately l.DOO EPA  and other Federal laboratories and federal-
ly contracted  laboratories.   These  materials are  used  by  the laboratories to
maintain internal quality control  to  ensure that  their  data are accurate, precise,
and reproducible.   The  program  also  will  continue  to  serve as a  central  source
of supply of special reference materials used in the gas chromatographic analyses
by the  Office  of  Pesticide  Programs'   cooperative  epidemiology  laboratories.

     A small effort will be devoted to study the feasibility of providing quality
assurance assistance to State pesticide laboratories.  This will assist State and
EPA enforcement  efforts,  which  are dependent  upon the  validity  of the analytical
measurements and data from these laboratories.

.HEALTH EFFECTS

1981 Accomplishments

     In 1981, the  Agency  used a total   of $2,347,800 for this program,  of  which
$2,140,100 was  under  the  Salaries  and  Expenses   appropriation  and  $207,700
was for  extramural  purposes  under the Research and  Development  appropriation.

     In 1981,  this  program  provided health  studies,  health testing protocols,
and direct toxicity assessment  support to the Office of Pesticide Programs (OPP)
in meeting the registration and enforcement responsibilities pursuant to Sections
3 and  26  of FIFRA.   For example, the program determined  exposure to pesticides
during home and  garden applications,  evaluated  air sampling devices  for  use in
indoor monitoring, and performed teratologic studies.

      Other work included continuation  of research  studies  on  the  development of
analytical procedures  for monitoring the  presence of biological  pesticides;  e.g.
insect viruses in human and  animal tissues and  in  environmental media.  Results
of this  work  were provided  to Office  of  Pesticide  Programs  (OPP)  staff  for
inclusion in guidelines and testing procedures for biological pesticides.

1982 Explanation of Changes from January Budget Estimate

                    January          March            Current
                    Estimate         Estimate         Estimate

                   $2,704,600       $2,562,800       $2,231,800

     The net  decrease  of  -$472,800  results  from  several  actions, as follows:
                                       P-19

-------
      -  January - March.   (-$141,800)  This  change  represented  a decrease  of
      5141,800 from  ftie January  budget,  of which  $135,800 was for  Salaries  and
      Expenses and 56,000 was  for Research and Development.  This decrease result-
      ed in  a reduced  effort  in the area  of huraan effects  of pestieidal  com-
      pounds  (epidemiology  studies).

      -  Congressional Actions.   (-$331,000)  A reduction of -$331,000 was applied
      to the  Salaries  and Expenses appropriation to meet Congressionally mandated
      appropriation  levels.

1982  Program

      In 1982, the  Agency  is allocating a  total  of $2,231,800 and 20.0 permanent
workyears to this program, of which $2,011,300 1s under the Salaries and Expenses
appropriation and  $220,500 is   for  extramural  purposes  under the Research  and
Development appropriation.

      In 1982, this  research will continue to support OPP through toxlclty testing
and health  test  protocol  development pursuant to  implementation  of FIFRA.   Re-
search is  also  continuing  on the health  aspects  of biological  pesticides  with
emphasis on  genetic stability  and interaction.   This  research is essential  in
determining the  possible  adverse  effects  of certain  viruses on the  human  cell
and supports OPP In writing guidelines for registration.

      Other research  concerns  the  effects  of pesticides on the developing  young
animals.  In addition to supporting registration  decisions, this research supports
an EPA/ Department of  Labor  (DDL) Agreement  to  review  re-entry  standards  for
young farm  workers.  The  effects  of pesticides  on animal reproductive  systems
are also  being  investigated,   which  will  assist OPP in  establishing  guidelines
for registration.  To aid  OPP in obtaining genetics toxicology data on pesticide
chemicals, a computerized data management and analysis system is being developed.

1983  Program Request

     The Agency requests  a total of $2,500,900 and  17.0  permanent workyears  for
this program, of which $1,260.000 1s under the Salaries and Expenses appropriation
and $1,240,900 is for extramural  purpose under the Research and Development appro-
priation.  This reflects  a decrease  of  $751,300 and an Increase  of  $1,020,400,
respectively.  The decrease results  from  reduction of in-house efforts in pesti-
cide exposure assessments.  The increase in extramural funds will be used for field
studies of human exposure  to  pesticides  and  for research  designed to  improve the
extrapolation of experimental  results from animal to man.

     Planned research will Include comparative pharmacodynamics studies to assess
exposure and adverse effects in  animal models and man.  These studies will  improve
extrapolation of data  from animal  to roan for better risk  assessment  In order to
make more cost-effective registration and re-registration  decisions.

     Work will continue to determine the effects of age, sex,  stress,  and species
on the b1oava1lability  of pesticides.   This  research Is  designed to  develop  a
suitable animal  model  for extrapolation  of exposure data  to man and to determine
conditions under  which the  young,  elderly,  pregnant, malnourished,  and  those
on medication may   be  more susceptible  to  toxicant exposure  than the  general
population.

     Research will  be  done to determine  the-effects of chemical  exposure on the
developing rodent and to carry out field  studies on human  exposure to  pesticides.
Research will continue on  the  development of  pesticide  re-entry  standards  for
young farm  workers.   Research   will  also  continue  on biological  pest  agents.
                                      P-20

-------
ENVIRONMENTAL PROCESSES AND EFFECTS

1981Accompl1shments

     In 1981,  the Agency  used  a total  of $4,491,100  for this program of  which
$2,572,300 was under  the  Salaries and Expenses appropriation  and  $1,918,800 was
for extramural purposes under the Research and Development appropriation.

     The major activities of this program element are to develop and apply  method-
ologies for  determining  fate and exposure of  pesticides relative  to  nontarget
aquatic and terrestrial organisms.   Specifically,  it provides information  need-
ed by  the  Office  of Pesticide  Programs,  the Regional  Offices,  and the States
to develop  regulations and  guidance,  supports  risk-benefit  evaluations,  and
management decisions concerning the safety of pesticide use.

     In 1981, a new approach mas developed to interpret toxidty data from pesti-
cides effects  on  some aquatic vegetation.  Research results  suggest that pesti-
cides that  degrade rapidly  while  inhibiting growth  should  not  be considered
dangerous.  This  Information can  greatly  accelerate  the  registration  process
under FIFRA and establish  more  effective  water quality criteria under  the  Clean
Water Act.

     Chronic toxidty  test methods  were  developed  for comparing  sensitivities
of estuarine fishes  using several  pesticides.   This work was requested  by  the
Office of  Pesticide  Programs (OPP).   This  information is  needed  for reducing
the amount of required testing for the registration  of  pesticides.

     A microbial   testing  and screening technique  was  developed to  provide pre-
liminary information on detoxification, biodegradatfon,  and  transformation  rates
in aquatic  environments.   Several   pesticides  on   the  Rebuttable  Presumption
Against Registration (RPAR) list were  evaluated with  this fate-screening  protocol.
This data  filled  immediate  OPP needs to  assess  the  fate  of  these pesticides.

     Acute and chronic toxlcity tests on  five pesticides  using freshwater  fish
and six aquatic invertebrates were  completed.  Results show  that  low concentra-
tions may be  either lethal  or  cause behavioral  changes dependent  on  the  test
organism.

     Guidelines have been developed  for the integrated  control of several  aquatic
weeds in the  Southeastern United States,  which provide  information needed  for
development of  sound  aquatic   weed  management  strategies.    A  report entitled
"Integrated Aquatic  Meed  Management:  Research  Sponsored or  Conducted  by  Eight
Federal Agencies"  has  been completed  and  distributed.   Additional data has been
developed for incorporation Into  integrated pest management  strategies  for four
major agricultural crops:   alfalfa,  apples,  cotton and  soybeans.

1982 Explanationof Changes from January Budget Estimate

                    January          March            Current
                    Estimate         Estimate        Estimate

                   $3,483,300       $3,197,000       $2,339,300

     The net decrease  of  -$1,144,000 results  from  several  actions, as follows:

     -  January -  March.    (-$286,300)   This1  change represented   a  decrease  of
     5286,300 from the January  budget,  of  which  $196,300 was  for  Salaries  and
     Expenses and  590,000 was for Research and Development.   This decrease resul-
     ted In reduced  support in   the  area  of  environmental exposure and  effects
     research.

     -  Congressional Actions.   (-$857,700)  A reduction  of  -$661,900 was  taken
     against the  March estimate  reflecting the  September 125 reduction  to  the
                                      P-21

-------
     Research and  Development  appropriation   reflecting  the  House  and  Senate
     Conference's action on EPA's 1983 Appropriation Bill.

     An additional reduction of -$195,800 was applied to the Salaries and Expenses
     appropriation to  meet the Congressionally  mandated appropriation  levels.

1982 Program

     In 1982,the Agency  is allocating  a  total  of $2,339,300 and  47.0 permanent
workyears to  this  program,  all of  which  is  under  the  Salaries and  Expenses
appropriation.

     The 1982 ecological  effects research effort will sharpen the Agency's ability
to assess the adverse  or potential  adverse impacts of pesticides  on  aquatic  and
terrestrial non-target organisms; on physical, chemical  and biological processes;
and on  interactions  between  the  various  environmental  components  and  biota.
Pesticides selected will  be those in common  use, those in  the registration and re-
registration process  or  within  regulatory  reform  procedures, and new  or alterna-
tive pest  control  agents which  have  been  designated  as  high  priority  research
needs by the Office of Pesticide Programs  (OPP).

     Major research  areas  include  the  determination  of  the  effects  and  the
transportation and fate  of pesticides in coastal  waters,  freshwater,  and terres-
trial environments.   The  research  encompasses  methods   development,  toxicity
testing, and data generation regarding dose-response relationships  of organisms.
Testing protocols, based  on methods development,  will  be  provided  to  OPP for use
in the public and private sector.

     Laboratory studies  will  incorporate  bipassays and microcosm  research under
controlled regimes in both static and flow-through systems.   In  addition, verifi-
cation studies and  validation  experiments  will be  carried out in  semi-natural
systems.   Field  validation experiments  will also  be conducted in simulated
natural habitats to  evaluate  field  applicability  of laboratory  data.   Laboratory
activities will  also  Include  methods and  protocol  development  and tier testing
schemes.  Transport and  fate  studies, that  quantify  rate  and  route movements and
degradative processes,  are also planned.

     The exposure assessment  research in  this program  will continue  to  evaluate
pesticide exposure concentrations.   Additionally,  modeling activities  will  define
the actual  or potential   ecological  damages.    Information  generated   from  these
activities will   be used  within the  Agency's  regulatory  process to  determine
environmental risk and;  thereby,  form  the basis for  regulatory   action.   This
information may also  form the  basis of  guidelines to  be used  by  industry  in
experimental testing  programs, as required by  the  FIFRA.

     During 1982, the EPA will complete development of methodologies for integrat-
ed aquatic weed control.   These methodologies will  include the development  of  a
Decision Support System and the  evaluation of the environmental  impact of chemical
and biological controls.   Final  reports dealing with integrated pest management
(IPM) will be submitted  on several projects  Including a  complete  data  base  for
urban pests  and  detailed  strategies  for  Integrated pest management   of cotton,
alfafa, apples and soybeans.   In addition,  final  reports  will  also be submitted
on the development of farmer financed IPM  systems.

1983 Program Request

     The Agency requests  a total of  $2,947,700 and 44.2  permanent wortcyears  for
this program, of which  $2,330,900 Is under the Salaries  and Expenses appropriation
and $616,800 is for extramural purposes  under the  Research and Development appro-
priation.  This reflects an decrease of $8,400  and an increase  of  $616,800,  res-
pectively.  This slight decrease in Salaries and Expenses  results from an organi-
zational  adjustment for better personnel utilization.   The increase in extramural
resources will be  used to fund  a  research effort  for the determination  of  the
                                     P-ZZ

-------
field applicability  of laboratory-derived pesticide  testing  protocols.   Results
of this research effort will support the registration of pesticides.

     To aid in achieving the 1983 goals,  the  research  has been conceptually divid-
ed Into three categories  of activities,  1) Data Testing Protocols, 2) Analytical
Models and 3) Scientific Expertise:

     Data testing protocols will Include  Information generation on pesticide tran-
sport, transformation, and bioaccumulation to support exposure assessments.  Pes-
ticide effects  will  be determined  on  nontarget aquatic and  terrestrial  species
by biochemical testing and biological studies.   These  studies Mill supply improved
methods and testing protocols to provide data on pesticide Impacts.

     Analytical  models  Mill be  expanded and  refined for accuracy  and  will  be
used to predict  pesticide impacts.  These models  will  assist in  more  rapid and
complete analysis  for  regulatory   needs.   The  research approach will  Include
laboratory studies,  field  investigations,   and area  studies.   The  information
from those studies  will  be assimilated Into the mathematical models.  Long-term
field validation  studies  Mill  be  initiated  to  further  validate  laboratory
findings and  to calibrate  the models.   The  modeling  techniques  and  pesticide
assessment reports will be supplied to OPP and other users.

     Specific scientific expertise  will  be utilized to  conduct  special  toxicity
tests to determine pesticide dose-response effects; to estimate pesticide duration
and concentration; and to investigate pesticide persistence in various environmen-
tal components.    Chemical  analysis capabilities Mill  be applied In  all  research
efforts to maintain both quantitative and qualitative  Integrity.
                                     P-23

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                              PESTICIDES

                           Registration, Special Registration ft Tolerances

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                      1981     ESTIfWTE   ESTIMATE   ESTIMATE     1983    DECREASE -
                                                 1982       1982        1982            1983 VS 1982

                                              (DOLLARS IN THOUSANDS)
PROGRAM
Registration
 Salaries & Expenses
 Abatement Control ft
 Compliance

Special Registration
 Salaries & Expenses
 Abatement Control ft
 Compliance

Tolerances
 Salaries ft Expenses
 Abatement Control &
 Com pi {a nee
 $7,725,4   $7,923.2   $7,914.1   $7,782.1   $7,224.6   -$557.5
   $696.8
 $2,254.0   $2,291.0   $2,045.3   $1,993.0   $2,227.7    $234.7
   $273.1      $44.7
 $2,069.2   $2,173.6   $2,164.7   $2,164.7   $2,390.2    $225.5
    $65.7
TOTAL:
 Salaries & Expenses
 Abatement Control &
  Compliance

Registration, Special   TOTAL
Registration 6
Tolerances
$12,048.6  $12,387.8  $12,124.1  $11,939.8  $11,842.5    -$97.3
 $1,035.6      $44.7
$13,084.2  $12,432.5  $12,124.1  $11,939.8  $11,842.5    -$97.3

-------
                   PESTICIDES
Registration, Special  Registration & Tolerances

PERMANENT FULL-TIME HORKYEARS
Registration
Special Registration
Tolerances
TOTAL PERMANENT HORKYEARS
TOTAL HORKYEARS
Registration
Special Registration
Tolerances
TOTAL UORKYEARS
ACTUAL
1981
222.8
65.2
73.2
361.2
230,8
65.7
76.4
372.9
JANUARY
ESTIMATE
1982
215,3
62.2
S6.7
334.2
237,8
68.5
67.3
373.6
MARCH
ESTIMATE
1982
215.3
54.2
56.7
326.2
237.8
60.5
67.3
365.6
CURRENT
ESTIMATE
1982
218.3
53.2
56.7
328.2
246.7
59.5
67.3
373.5
ESTIMATE INCREASE +
198-3 DECREASE -
1983 VS 1982
183.5
57.8
62.4
303.7
203.0
63.5
74.1
340.6
-34.8
4.6
S.7
-24.5
-43.7
4.0
6.8
-32.9

-------
                                    PESTICIDES

                Registration. Special Registration and Tolerances

Budget Request

     The Agency requests a total of $11,842,500 and 303.7 permanent workyears for
1983, a decrease of $97,300 and 24.5 permanent workyears  from 1982.  All  of this
request is for the Salaries and Expenses appropriation.  The Agency's initiatives
to streamline the  registration  and tolerance processes,  while at the  same  time
ensuring achievement of mandated missions, account for the decrease.

Program Description

     The goal of this  subactivity is to  facilitate  a  steady flow of environ-
mentally safe products  to  the  marketplace.  The Agency evaluates  all  pesticides
under a  "no  unreasonable  adverse  effects"   standard,  taking  into  account  the
economic, social,  and  environmental   risks   and  benefits  of  the  use  of  any
pesticide.

     Registration —  Under  the  registration program,  new  pesticide  products
are registered and current  registrations are  amended to  add  uses and/or  new
formulations.  This registration  is  accomplished  by:  (1)  reviewing  registration
applications and  supporting  data  to  ensure  that the  use of the products  will
not result  in "unreasonable adverse  effects" to  man  or  the environment  and
to ensure  that  public  health  products  (e.g.,  disinfectants)  are  reasonably
effective for their proposed uses;  (2)  limiting  the  risks  associated with  use
through label precautions,  special  packaging requirements, application directions,
and, where necessary,  restriction of use to trained applicators; and (3)  providing
incentives, through reduced data requirements and  more rapid  review,  for environ-
mentally safe pesticides.  These include products such as biorational  pesticides
and pesticides which  provide  safer  alternatives  to cancelled  products or  other
products which provide  pest  management.   A specific procedural objective of the
registration program  is  to  expedite  the  registration  process  by  developing
guidance packages that help registrants understand what they  must  do to register
and reregister their  products.  Finally,  as  new studies and  data  are  developed,
the registration program has the ongoing task of  upgrading label  precautions and
use directions with emphasis on non-target exposures,  field  workers, application
safety, and pesticide  container disposal.

     Spec 1 al Regi strati on — The special  registration program performs  an  auxil-
iary TunclTofrTo~TnTTeg1 strati on  process by: (1) allowing experimentation  with
nonregistered products  or uses  to  develop  data  needed  for registration;  (2)
establishing safe pesticide  residue  (tolerance) levels  for crops  to be marketed
following the application  of experimental  use pesticides;  (3) permitting the  use
of unregistered  pesticides or the use of pesticides for  sites/pests  not included
in their registration  to meet  pest  emergencies when  the benefits  of such  use
exceed the risk; and  (4) reviewing State  registrations of pesticides distributed
and used only within  the registering  State for special local  needs,  to determine
if proper tolerances  have  been  established and the  chemicals involved have  not
been suspended or cancelled.   Section i  of  FIFRA requires  the  Agency to  take
action on an experimental  use permit within 120 days after receipt of  the appli-
cation and  all   supporting documentation.  Special  local  needs  registrations,
which are authorized by  Section 24(c)  of FIF^RA, must be  reviewed  within 90 days
after the State issues a registration.   If the Agency  takes no action to disallow
the registration  within that time, it automatically becomes effective.

     Tolerances —  The  tolerance  program  fulfills   the  requirements  of  the
Federal Food, Drug, and Cosmetic Act (FFDCA)  as it applies to pesticide  products.
Under FFDCA, before a  pesticide can  be registered under FIFRA  for use  on a  food
or feed crop, the  Agency must either establish a tolerance for that  use,  stating
the maximal  residue limits permissible, or grant  an exemption from the  tolerance
requirement.  By  statute,  food  and  feed  additive petitions  must be  processed
                                       P-26

-------
within 180 days and raw agricultural  commodity petitions must be processed  within
120 days.

REGISTRATION

1981 Accomplishments

     In 1981, the Agency  obligated $8,422,200, of  which $7,725,400 was for  the
Salaries and Expenses appropriation and  $696,800  was for the Abatement, Control
and Compliance appropriation.

     In 1981, the Agency conducted 142 reviews of  new chemicals  and biorationals;
7,673 reviews  of registrations  for  new  products  that  contain  old  chemicals
identical or  substantially  similar  to  others already  registered;  and  22,736
amended registration  reviews,  which  Included  amendments to  current  pesticide
labels, administrative amendments, and supplemental  (distributor)  registrations.

     To reduce the  burden of Federal  regulations,  the  Agency  began to examine
existing regulations under Section 3  of FIFRA to define more  clearly, accurately,
and concisely the information required to  register  a product.  Label guidelines
setting forth clear and  consistent labeling requirements were  developed and  are
in the final  stages of review.  Through the Label Improvement  Program, registrants
of termiticides  and  fumigants  were required  to make  label  changes designed  to
communicate basic information essential  for the  protection  of  human health  and
the environment  and for  clarity  to  the  users and  enforcers.   A  total  of  18
registration guidance  packages  were  developed to  inform  registrants of  the
requirements for reregistering pesticide  products  within the scope  of applicable
registration standards.

1982 Explanation of Changes from January  Budget Estimate

                    January          March             Current
                    Estimate         Estimate         Estimate

                   $7,923,200       $7,914,100       $7,782,100

     The net decrease  of  -$141,100  results  from several actions, as  follows:

                - March.   (-$9,100)  This change represented  a decrease  of  $9,100
     from the January  budget,  all  of  which  was for  the  Salaries and  Expenses
     appropriation.

     "  Reprogramroing.   (+$185,900)  During the development of the operating plan,
     several miscellaneous reprogrammings, which are not reportable to  Congress,
     were made to  the  activity  and resulted  in a  net Increase of +$185,900.

     -  Congressi onal Acti ons .   (-$317,900)   A reduction of -$317,900  was applied
     to the salaries and  Expenses appropriation  to meet Congressi onal ly mandated
     appropriation levels.

1982 Program

     In 1982, the Agency  is  allocating a  total of $7,782,100 and 218.3  permanent
workyears, all of which is in the Salaries and Expenses appropriation.

     In 1982, the  Agency expects  to  conduct  185  reviews   of new chemicals  and
biorationals, 7,550  reviews  of  registrations for  new  products containing  old
chemicals identical  or  similar  to others already registered,  and 20,000 amended
registration reviews.

     Since the  breakthrough achieved  by  the 1978  amendments,  which  provided
for conditional   registration,   the  Agency  continues  to  capitalize  oh  process
efficiencies.  In 1982, process changes will  continue to be initiated  or improved
                                     P-27

-------
upon to ensure  that  the  costs of  registration  are  no higher than necessary  and
to reduce the backlog  and  processing  time.   Improved process management will  be
accomplished through  ongoing  refinement of  an  automated tracking  system as  a
means of process  control,  streamlining  operating procedures, and monitoring  the
progress of priority review registrations.

     Legal problems, such as the numerous FIFRA Section 3(cHl)(D) (data compen-
sation) law suits, which resulted  in  process inefficiencies, are being resolved
In favor  of the  Agency.   This  1s clearing  away confusion  and uncertainty  and
leading to reduced paperwork and less  lost time  in litigation support.

     By completing  testing  guidelines,  revising   application   procedures,   and
having more  frequent  preappll cation  conferences with  registrants,  the   Agency
will increase the quality, and thereby reduce the  number  of  industry   resub-
missions, and improve  the  timeliness  and  consistency  of  Agency  actions.   The
final publication  of labeling  guidance  1n  1982  will  substantially reduce  the
uncertainty among registrants  and increase label  consistency.

     New initiatives  beginning   In 1932 include   deregulation  of  classes   of
pesticides (such as pheromones used In traps) under Section 25 of FIFRA, extension
of efficacy data   waivers,  and   cooperative  monitoring  of  rodenticlde efficacy
with users (such as trade associations)  instead  of solely with Agency resources.
Continuing efforts will  include providing farm safety information  to Federal,
State, and local government agencies.

1983 Program Request

     The Agency  requests a  total of $7,224,600 and 183.5 permanent workyears  for
this program,  all  of which  is in the  Salaries and Expenses  appropriation.  This
represents a decrease of 5557,500 and  34.8 permanent  workyears.   The  reduction in
permanent workyears  from  1982  to  1983  win  be offset by  deregulation   (e.g.,
elimination of  premarket  review  of  distributor  applications)   and  the use  of
efficiencies introduced in  1982  in the administrative, technical, and scientific
processing of applications.

     In 1983,  the  Agency  expects  to  conduct 130 reviews  of new  chemicals  and
bioratlonals,  6,000  reviews of  registrations  for  new  products  containing  old
chemicals Identical  or similar  to  others already registered, and 18,000 amended
registration reviews.  The  decrease  1n  outputs in  1983  from   1982 reflects  a
reduction in  the  average  number of  reviews per  chemical   by  streamlining  the
application process and the elimination  of the existing  backlog.

     For the first time, the  registration process  will  benefit  from information
gathered by the Agency and  industry through  the registration standards program.
This will result  In  resource  savings  to  the  industry and  the Agency  1n preparing
and reviewing applications  for   those  chemicals for  which  standards  have  been
developed.  The  Agency will  continue to  Improve  labeling by  requiring registrants
to correct faulty precautionary  statements and to Incorporate guidance on hazards
associated with  the  use  of pesticides.  Acceptance  of draft labels in Heu  of
final labels  and  elimination of  premarket  review of  distributor  applications
will reduce the turnaround time for  registration  approvals.   The  Agency  will
continue to seek ways  to reduce  worker exposure  to pesticides through the  use of
protective clothing, respirators,  and closed systems apparatus and development
of worker reentry  standards.  The  Agency will explore the possibility of extend-
ing efficacy waivers to hospital disinfectants  and sterilants; this  effort would
include asking trade and  professional associations to take on the task of monitor-
ing efficacy.  With  successful  Implementation of deregulation strategies and the
achievement of further efficiencies beyond those accomplished In previous  years,
the Agency expects to  reduce  turnaround times and to eliminate  backlogs 1n 1983.
                                      P-28

-------
 SPECIAL  REGISTRATION

 1981 Accompli shnients

     In  1981,  resources  obligated  on  special  registration  activities totaled
 $2,527,100, of  which $2,254,000 was for  the  Salaries  and Expenses appropriation
 and 5273,100  was   for  the  Abatement,   Control  and  Compliance  appropriation.

     During 1981, the  Agency  began using a priority review system and a tracking
 system to  increase its capability to process  special  registration  applications
 more efficiently.   Increased  use  of informal  communications  with  States  and
 industry to  answer  questions  and  obtain  necessary  additional  data decreased
 review time and  saved resources.  The Agency conducted  450  reviews  of emergency
 exemption requests  to  combat  pest  outbreaks,  434 reviews  of  experimental  use
 permits  to allow data to  be developed  for support of future registrations,  109
 reviews  of  temporary tolerance  petitions to  permit marketing  of experimentally
 treated  crops, and  1,424 reviews of  State registrations of pesticides distributed
 and used only within the registering State to meet special local needs.

 1982Explanation ofChanges from January  BudgetEstimate

                    January          March          Current
                    Ejtjmate         Estimate       Estimate

                   $2,335,700        $2,045,300     $1,993,000

     The net  decrease of  -5342,700 results  from  several  actions,  as  follows:

     "   January - March.   (-$290,400)   This  change  represented  a  decrease  of
     $290,400 from  the  January budget,  of which 5245,700  was for  Salaries  and
     Expenses and  $44,700 was  for  Abatement,  Control    and  Compliance.   This
     reduction primarily  resulted  from the transfer of  the  Northwest Biological
     Investigations Station  at  Corvallis,  Oregon to  the  U.S.  Department  of
     Agriculture.  The elimination of all  Abatement, Control   and Compliance funds
     reflects the  completion   of  contractual  work  which provided the necessary
     data bases for future decisions.

     -   CongressionalI Action?.   (-552,300)  A  reduction of -$52,300  was applied
     to  SalariesanUExpenses  appropriation  to meet  Congressionally  mandated
     appropriation levels.

 1982 Program

     In 1982, the Agency  is  allocating a total of  $1,993,000 and 53.2 permanent
workyears, all of which are in the Salaries and Expenses appropriation.

     In  an effort  to eliminate  backlogs  and  reduce processing  time,  the Agency
expects to make  major  regulatory, programmatic, and  procedural  changes.   With
emergency exemptions,  the  Agency  will   examine  the  possibility  of  accepting
multi-year exemption  requests  rather than  repetitive  one-year requests.   For
experimental  use  permits,  consideration  will  be  given to  Increasing  allowed
acreage for testing purposes to eliminate the need  for repetitive requests.  The
process  for reviewing State registrations  for special local needs will be examined
to consider exempting  some  data  requirements  Imposed  on  States  and  allowing
State agencies to  certify to  the  Agency  the  appropriateness of  those registra-
tions that do not  Involve food uses.  The Agency expects to  reduce  oversight of
State responsibilities  in  the special  local  needs area  and will be  delegating
more authority  to  States to  certify  emergency  situations.   For  all  program
categories, the  Agency  will   consider reducing  reporting burdens and modifying
Initial screening processes to reduce processing times.

     In 1982, the Agency will  conduct 370  reviews of emergency exemption requests,
465 reviews of  experimental  use  permits, 120  reviews of temporary  tolerances,
and 1,040 reviews of State special local needs registrations.
                                       P-29

-------
1983Program Request

   The Agency requests a total of $2,227,700 and 57.8 permanent workyears, all  of
which is In  the  Salaries  and Expenses appropriation.  This amount  represents  an
increase of 5234,700 and 4.6 permanent workyears to  eliminate  the backlog and  to
ensure that statutory time limits are met.

   In 1983, the  Agency  anticipates  better and more timely responses as  a result
of productivity  improvements.  All  emergency  exemption  requests will be decided
prior to the time their use  is required.   Statutory  time  limits for experimental
use permits, temporary tolerance petitions, and special  local  needs  registrations
will be met.  Existing backlogs will be eliminated.  The Agency expects to conduct
400 reviews  of  emergency exemptions, 490 reviews of experimental  use  permits,
140 reviews of temporary tolerance petitions, and 1,100 reviews  of  special  local
needs registrations.

TOLERANCES
11981^ Accomplishments

     In 1981,  resources  spent  for  the  tolerance  program totaled  $2,134,900,
including $2,069,200 for the Salaries and  Expenses  appropriation and  365,700  for
the Abatement, Control  and Compliance appropriation.

     The Agency  conducted 371  reviews  of  tolerance petitions, Including  final
action on 74  minor use petitions, and 73  reviews of inert ingredient  requests.
Policy and procedural changes were published establishing tolerances for  pesticide
residues in rotational  and  follow-up crops, meat,  milk,  and eggs  and  for  other
indirect or inadvertent residues on raw agricultural commodities.

1982 Explanation of Changes fromJanuary Budget Estimate


                    January          March             Current

                 "   Istimate         Estimate -        Estimate

                   $2,173,600       $2,164,700        $2,164,700

     The net  decrease   of  -58,900  results  from  several  actions,  as   follows:

     -  January -  March.  (-$8,900)   This change represented a decrease  of $8,900
     from the Salaries and Expenses appropriation.

1982 Program

     The Agency is allocating a total  of $2,164,700 and 56.7 permanent  workyears
to this program,  all  of  which  is  in the  Salaries and  Expenses  appropriation.

     The Agency expects to conduct 345  reviews of tolerance petitions,  including
action on approximately 75 minor use  petitions, and 35 reviews of inert ingredient
requests.  To reduce the processing time, prereglstrati on  conferences  with appli-
cants will be conducted to  identify and resolve possible  issues  on petitions.
The Agency will  fully utilize the policy of; reducing requirements  for minor uses
of pesticides and  begin using  crop  tolerance  groupings of petitions to  broaden
the applicability  of tolerances.   The priority review  system will   give emphasis
to decisions  with  statutory deadlines.   Action will  be initiated  to adjust  the
fee schedule  for petitions  so  that  fees charged  fully  cover the actual  cost of
processing applications, as  authorized  under  Section 408  of  the  Federal  Food,
Drug, and Cosmetic Act.  However,  the  Agency will  continue  to waive fees  in
cases of  economic  hardship  and/or public Interest  (Federal  or  State agency  re-
quests, important public health uses,  innovative  pesticide chemicals,  and  chem-
                                       P-30

-------
icals/biorationals used  in  integrated pest  management which  result in  reduced
chemical applications).  Approximately 85 percent  of the petitions will be  pro-
cessed within statutory deadlines.

1983 Program Request

    The Agency requests  a  total  of $2,390,200 and  62.4 permanent workyears  for
this program, all of which  is  in the Salaries and  Expenses  appropriation.   This
amount represents an Increase of $225,500 and 5.7 permanent workyears which  will
allow the Agency to eliminate the backlog and to process  all  tolerance  petitions
within the statutory time limit.

     Requested resources will  permit 400 tolerance petition reviews,  including
action on approximately 75 minor use petitions, and 35 reviews of Inert ingredient
requests.  The Agency will  eliminate  the backlog of tolerance petitions and  meet
the 120 day statutory time  limit by the end of 1983.  Most of  the inert ingredient
requests and the minor use petitions  will be processed within 90 days.  Efficien-
cies will result from  the  Agency's full  utilization of policies for  crop group-
ings and minor uses.  Clarification of data  requirements through completed regis-
tration standards will  reduce  the number of reviews per petition necessary  for
granting tolerance petitions.
                                        P-31

-------
                                              PESTICIDES

                                       Standards Setting £ RPAR

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Registration
Standards
 Salaries & Expenses
 Abatement Control &
 Compliance

RPAR Reviews
 Salaries fi Expenses
 Abatement Control &
 Compliance

RPAR Kevlews-EIS
Preparation
 Salaries & Expenses
           $6,063.2   $5,406.4   $4,373.9   $4,107.6   $3,669.9
           $8,115.3   $9,400.4   $6,100.1   $3,913.5   $4,180.1
           $4,771.3   $5,695.7   .$5,172.0   $4,988.0   $4,470.9
           $8,991.3  $14,873.7  $10,863.3   $7,055.3   $7,390.6
             $125.8     $105.1     $105.1     $105.1
                                               $105.4
                                                        -$417.7
                                                         $266.6
                                                        -$517.1
                                                         $335.3
$.3
TOTAL:
 Salaries & Expenses
 Abatement Control &
 Compliance

Standards Setting &
 RPAR
TOTAL
          $10,960.3  $11,207.2   $9,651.0   $9,200.7   $8,266.2   -$934.5
          $17,106.6  $24,274.1  $16,963.4  $10,968.8  $11,570.7    $601.9
$28,066.9  $35,481.3  $26,614.4  $20,169.5  $19,836.9   -$332.6

-------
                                              PESTICIDES

                                       Standards Setting & RPAR

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1961     ESTIMATE   ESTIMATE   ESTIMATE    19B3   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME WORKYEARS
Registration
Standards
RPAR Reviews
RPAR Revlews-EIS
Preparation
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Registration
Standards
RPAR Reviews
RPAR Revlews-EIS

149.7 137.6
131.1 140.8
3.8 2.8
284.6 281 .2

162.7 150.8
137.7 147.7
3.9 2.8

116.6
131.8
2.8
2S1.2

128.8
137.7
2.8

103.4
101.4
2.8
207.6

108.2
105.7
2.8

93.3 -10.1
92.6 -8.8
3.0 .2
188.9 -18.7

99.6 -8.6
93.3 -12.4
3.0 .2
Preparation
TOTAL WORKYEARS
304.3
301.3
269.3
216.7
195.9     -20.8

-------
                                  PESTICIDES

        Standards Setting and Rebuttable Presumption Against Registration


Budget Request

    The Agency  requests  a total  of  $19,836,900  and  188.9 permanent  workyears for
1983, a decrease of $332,600 and 18.7 permanent workyears  from 1982.  Included in
this total is $8,266,200 for Salaries and Expenses and $11,570,700 for Abatement,
Control and Compliance, a decrease of $934,500 and an increase of $601,900 respec-
tively.  Efficiencies  and  other  process changes  (e.g.,   increased emphasis  on
negotiating with registrants to avoid the time and expense of full  RPAR reviews,
and shift from world-wide to specific literature searches in the standards program)
account for decreased  salaries  and  expenses.   Increased reliance on  contractors
to obtain Information for the data base of these  programs accounts for the increase
in abatement and control.   This  level  of funding will provide  for  the continued
development of  pesticide  registration  standards, which are  a primary  factor in
the improved  efficiency  of  future pesticide  registration  and  reregistration
activities.  This budget will  also permit the  continuation  of necessary intensive
risk/ benefit reviews  --  through the Rebuttable  Presumption  Against Registration
(RPAR) process  —  of  pesticide  chemicals  suspected  of  causing  "unreasonable
adverse effects" and implementation  of risk reduction measures,  as appropriate.
Integrated pest management activities will continue.

Program Description

     The goal  of this  subactivity is providing the Agency with  processes  to re-
register currently  registered  pesticides  and  evaluate   potentially  hazardous
pesticides.  The Registration  Standards  program  was  established to  enable the
Agency to meet  efficiently  the mandate in Section 3 of the  Federal  Insecticide,
Fungicide, and  Rodenticide  Act (FIFRA) to reregister currently  registered  pesti-
cides.  The Rebuttable Presumption  Against  Registration (RPAR)  program evaluates
pesticides which have  an  identified potential  for producing  significant adverse
health or environmental effects.

     Registration Standards — The principal goals  of  the program are  to stream-
line reglstrati on  and  reregi stration  actions  and  to  update  the  decision  data
base in  accordance  with current  scientific   standards  and  regulatory  policy.

     Many widely used  pesticides were registered  over  20  years  ago and  have
incomplete or  invalid  health  data  to  support their  registration.   The  chronic
health and  environmental   effects  of  pesticides result  primarily  from  active
ingredients and, to  a  lesser  extent,  from some inerts.  The Agency will  concen-
trate its review on the most significant active and  inert ingredients.

     The development  of  a  registration  standard is divided into  three  phases:
(1) data gathering,  (2) data evaluation,  and (3) development and issuance  of the
registration standard.  Pesticide residue tolerances,  established under authority
of the Federal  Food, Drug, and  Cosmetic  Act,  are  reviewed  and respecified for
each of the food  or  animal crops to which  the chemical  is applied.   The  Agency
is pursuing opportunities  to  increase  industry involvement  in  the  standards
development process.    This  expanded  Involvement will Include  such  activities
as industry cooperation   in the  preparation,  of bibliographies,  use  profiles,
summaries of  company-submitted  studies, and  development  of  draft  standards.

     Current litigation  still  challenges the  constitutionality  of basic  FIFRA
data use and disclosure provisions.   However, recent court  decisions have largely
resolved the legal  issues  and  endorsed the  standards approach.  This  request is
based on the assumption that the  final  outcome  of currently unresolved litigation
and new legislation being considered in the Congress will continue to be favorable
to the Agency.
                                       P-34

-------
     RPAR Reviews  — The RPAR process considers  human and environmental exposures
and risks,  reviews  of the  benefits  of RPAR  chemicals,  reviews  of  the possible
substitutes for  these  chemicals,  and assessments  of  the  possible  regulatory
options or  other actions  which  would  reduce risk and exposure.   Such evaluations
result in the  return  of the chemical   to the  normal  registration  process  if risk
concerns are not borne  out  by the review.   In other cases,  steps to restrict or
prohibit specific uses  of the  chemicals may  be taken through  Agency regulatory
actions or  voluntarily  by  the  manufacturers.    Increased  emphasis  is  being
placed on negotiating with registrants to  obtain less  adversarial  solutions to
risks.  This will  avoid  for  all  parties  the time and expense  of the  full  RPAR
process or  adjudicatory  hearings  while  achieving  equivalent   risk  reduction.

     RPAR Reviews - Environmental Impact Statement Prepa rat-ton —  The  goal   of
this program  is the  preparation of  statements  which  delineate  the  impact  on
humans and/or the environment  due  to  exposure to a pesticide which  will  be used
or restricted through  the RPAR process.   Such statements are part of documenta-
tion leading to RPAR decisions.

REGISTRATION STANDARDS

1 98 1 Accompl i shments

    In 1981, a  total  of S14.178.500  was obligated,  including S6, 063, 200  for the
Salaries and  Expenses appropriation  and  $8,115,300 for the Abatement,  Control
and Compliance  appropriation.    The  extramural   resources  were  for information
services and  scientific  data  review  contracts   to  support  the  development  of
registration standards.  These resources were used to gather and analyze chemical
data, to  gather pesticide use  information, to  perform economic  impact analyses
of various  regulatory  recommendations,  to  support toxicology and chemistry data
evaluations, to evaluate health effects, and to fund various pesticide monitoring
and integrated pest management projects.

     In 1981, the emphasis  was  on  standards production.   Internal procedures and
productivity improvements developed in 1980 were  implemented and 18 registration
standards were completed, for  a cumulative total of 24.  The Agency initiated a
data call-in program  to  obtain  long-term  chronic health  data  on  chemicals for
which standards  had  not  yet  been  started.   Data  call-in  ensures  that   these
critical data will  be available  by the time standards  are  ready for development.
The Agency  also Increased -involvement  by  registrants at  several "key  points in
the review  process.

1982 Explanation of Changes from January Budget Estimate

                    January          March            Current
                    Estimate         Estimate         Estimate

                  514,806,800      $10,474,000       58,021.100

     The net decrease  of  -56,785,700  results from  several  actions, as follows:

     -  January - March.   (-$4,332,800)   This change  represented a  decrease of
     54,312, 8" 00 from  the  January budget,  of which  51,032,500  was  for Salaries
     and Expenses  and  $3,300,300  was  for  Abatement,   Control  and  Compliance.
     This resulted  in  a  decrease  of  five  completed  registration  standards
     from the January budget and will  stretch-out the program.
                   i      (-$108,300)   An  Agency-wide  reprogramming  of  -515,200
     provivdearesources for transfer of the accountability function to the Office
     of Management  Systems  and Evaluation and,  in  addition,  provided additional
     resources for the  Immediate  Office  of the Assistant Administrator for Solid
     Waste and  Emergency  Response.   (This  reprogranming  was  included  in  the
     letter to Congress on December 16, 1981).
                                      P-35

-------
     During the development  of the operating plan, several  miscellaneous  repro-
     grammings, which are not  reportable to  Congress,  were made  to this  activity
     and resulted in a net decrease of -$93,100.

     -  Congressional Actions.    (-$2,344,600)   A  reduction of  -$1,586,600  was
     taken against the March estimate, reflecting  the  September  12% reduction to
     the Abatement, Control,  and Compliance appropriation for extramural  support.
     This action will reduce registration  standards produced from 16 to  approxi-
     mately 14.

     An additional  reduction  of -$758,000 was applied to the Salaries and  Expenses
     ($158,000) and Abatement,  Control, and  Compliance ($600,000)  appropriations
     to meet Congressionally  mandated appropriation levels.

1982Program

     In 1982, the  Agency  is  allocating a total  of $8,021,100 and 103.4 permanent
workyears to this program, of  which $4,107,600  is  for Salaries and  Expenses  and
$3,913,500 is for extramural  purposes under the  Abatement, Control  and Compliance
appropriation.

     During 1982,  the Agency will  continue  making productivity improvements  by
using a more  selective  literature search,  standardizing  procedures  and  formats,
using existing  reviews  of data  from previous  registration  actions,  and  using
high quality reviews  from outside the Agency if they are  available.  Continued
emphasis will  be  placed  on Increasing  industry  involvement in  the standards
development process and will include such  activities  as  industry  cooperation  in
preparation of  bibliographies,  use  profiles,   summaries  of company-submitted
studies, and draft  standards.

     In 1982,  a major management  priority Is to  develop the means for  better
integrating registration  standards  Into  the  total pesticide  regulatory  system
and Unking  completed  standard  reviews  to subsequent  registration requests  on
the same chemical.   A  pilot project will  be  initiated  on  the development  of
standards for  new  chemicals  to determine  whether  a  combined registration  stan-
dard/new registration review  is  effective.   Work  will  continue  on the  review
of chemicals in clusters so that chemicals that  have the  same major uses  are
grouped together and  reviewed   in the same time  period.  The  Agency has  also
developed a  ranking  strategy to ensure review of  the most  significant  clusters
early in the program.  The criteria  for  ranking  Involve such factors  as volume,
potential hazard,   and  exposure  to  the  chemicals.  As  required  by FIFRA,  the
ranking approach gives  priority  to pesticide chemicals  with  food uses.    Equity
to manufacturers will  also  be considered to prevent competitive  disadvantages
due to the failure  to impose  consistent and nearly  simultaneous data requirements
on competing products.

     A total  of 14  registration standards are  expected  to  be  completed.   The
emphasis in  Integrated  pest  management activities will  be  on  control of  urban
pests.  Monitoring  activities will continue.

1983_ .Program Request

     The Agency requests  a total  of $7.870,000  and 93.3  permanent  workyears  for
this program, of which $3,689,900  is  for the.  Salaries  and Expenses appropriation
and $4,180,100  is for the Abatement,  Control  and Compliance appropriation.   This
represents a decrease  of $417,700  and an increase  of $266,600,  respectively.
Process efficiencies, such as a shift from  world-wide  to subject  specific litera-
ture searches,  account  for  decreased  Salaries   and  Expenses.   The  increase  in
Abatement, Control  and  Compliance results in Increased  reliance on  contractors
to supplement data  development  for registration  standards.
                                      P-36

-------
     These resources  are expected  to  permit  the  completion  of  15  standards,
and the  rereglstrati on of  some existing  pesticides.   Efficiencies  implemented
in 1982,  such as  more effective literature  searching,  simplified  formats,  and
increased use of reviews performed by outside sources,  will  be fully operational.
The Agency will  continue to  pilot  and implement additional  efficiencies,  such as
further interaction with registrants,  acceleration  of science  review,  reduction
of efficacy reviews through  cooperation with user groups and Increased reliance
on the marketplace,  further streamlining  of  standards documents,  and  reduction
of paperwork associated with the rereglstration process.

REBUTTABLE PRESUMPTION AGAINST REGISTRATION (RPAR) REVIEWS

1981 Accomplishments

     In 1981, a  total  of $13,762,600  was  obligated,  including $4,771,300  for the
Salaries and  Expenses appropriation  and  18,991,300 for  the Abatement,  Control
and Compllance appropriation.   Extramural  funds  were  for  Information  services,
site/pest information, use  analysis,  scientific  exposure/hazard assessment,  and
risk/benefit information.

     In 1981, the  Agency reached  final  resolutions on  11   chemicals,  Including
three cases where  companies  voluntarily withdrew their chemicals from the market
after negotiation with the Agency.   The negotiated voluntary withdrawals resulted
In resource savings for the Agency  and the companies, while  achieving significant
health and environmental benefits.  Agency experience  has  shown that such chem-
icals can often  be  returned  to  the market,  for  at least some uses,  under  changed
use conditions which   reduce  risk.    Support  was provided  for one  cancellation
hearing which resulted from an RPAR decision.

     The emphasis  in   the  laboratory   data  audit program  shifted  to  compliance
review so that labs  were audited only as  data  problems  arose.  A total  of  four
lab data audits were  performed and the results  of the  lab audit program were  fed
back into the RPAR and the registration processes with a  view toward Identifying
data gaps and the possible need for revised registration  decisions.

     The Industrial Biotest  Laboratory  (IBT)  review  program, developed  to ensure
accurate and  reliable testing procedures, validated 328  non-acute  IBT  studies,
and 35 chemicals completed  the Regulatory  Reassessment  phase  of  the  program.
The total number of  chemicals that completed  this  phase  of  the program  through
the end of 1981 was 58.

     Agency activities  initiated  in  earlier years  concerning  Sllvex  disposal
were continued.   Almost all  solid  forms  of  the   pesticide  were  disposed  of
through Agency  contracts issued  in  earlier  years.   Additional  contracts  were
issued In 1981 to begin disposal of liquid forms of  the pesticide.

1982 Explanation of Changes from January Budget Estimate


                    January          March            Current
                    Estimate         Estimate         Estimate

                   $20,569,400     $16,035,300      $12,043,300

     The net decrease  of  -$8,526,100 results  from  several  actions,  as  follows:

     "  January -March.  (-$4,534,100)   This  change  represented  a  decrease  of
     S4,534,iQO fromthe January budget,  of which $523,700 was for  Salaries  and
     Expenses and $4,010,400  was for  Abatement,  Control   and  Compliance.   This
     decrease was accomplished  by  reducing  lower priority  equipment purchases,
     consulting services, and  travel  as well  as contracts  providing  additional
     exposure analysis, benefit analysis,  and other  risk/benefit analysis.
                                       P-37

-------
     •  Reprogramiiing.   (-$243,300)   An Agency-wide  reprogramming  of  -$126,500
     provided resources for transfer of the accountability function to the Office
     of Management  Systems  and Evaluation and, in  addition,  provided additional
     resources for the Imnediate Office of  the Assistant  Administrator  for Solid
     Waste and  Emergency  Response.   (This  reprograttmring  was  included   in  the
     letter to Congress on December 16, 1981).

     During the development  of the operating plan, several  miscellaneous repro-
     grammi ngs, which are not  reportable to  Congress,  were made to this activity
     and resulted in a net decrease of -5116,800.

     -  Congressional Actions.   (-$3,748,700)   A  reduction of -$2,683,000  was
     taken against  the March  estimate  reflecting  the  September  12%  reduction to
     the Abatement,  Control,  and  Compliance appropriation.  This  reduction  will
     cause the outputs  of pre-RPAR  decisions (PD-1)  to  be reduced  from two to
     one and the proposed RPAR decisions completed  (PD-2/3) will  be  reduced from
     three to two.

     An additional  reduction  of  -$1,065,700  was  applied  to  the  Salaries  and
     Expenses ($390,700) and  Abatement, Control and Compliance ($675,000) appro-
     priation to meet Congressionally mandated appropriation levels.

         Transfer Authority. (No Change)  The net  change applied to this activity
     is made up of  a decrease  of -$450,000  to Abatement,  Control, and Compliance
     and an increase of  +$450,000 to  Salaries and Expenses for  critical  salary
     needs.

1982 Program

     In 1982, the Agency is allocating a total of  $12,043,300 and 101.4 permanent
workyears to the  program,  of which $4,988,000 is  for  Salaries  and  Expenses  and
$7,055,300 is for extramural purposes under the Abatement, Control and Compliance
appropriation.

     Emphasis is being placed on completing final  resolutions for those chemicals
that have been in the RPAR process  for several years.   New reviews will  be initi-
ated principally as a result of registration standards  development.  Final resol-
utions are  projected on  10 chemicals.  The  Agency will  reduce  the  number  of
adjudicatory hearings through  increased negotiation during  the RPAR  process.   In
light of the refinements  In  the RPAR program over the  past six  years  and statu-
tory changes in FIFRA  enacted by  the  1978  and 1980 Amendments,  the  Agency  will
also revise the  criteria  for issuing RPAR  decisions.   The purpose will be  to
take Into  account risk and  the reliability  and  completeness  of  the scientific
data base.  Additionally, the  proposed  criteria  will  require  that the  potential
for exposure to man  or  non-target  organisms be evaluated prior to the initiation
of an RPAR.   Peer review of  major scientific studies,  as  required  by the  1980
Amendments to FIFRA, will be  required  of all  Agency-sponsored  scientific studies
on which the  Agency relies to  support  a  finding  that  a  pesticide meets  one  or
more of the RPAR criteria.

     An increase  to  a  total  of 10 laboratory data  audits Is projected.  Support
will be provided  for hearings  resulting  from RPAR decisions.   Silvex disposal
activities will concentrate  on the  disposal  of liquid  forms  of  the pesticide.
The validation review  of 210  non-acute IBT  studies  and 149  chemicals  will  be
completed, thus ending the IBT review program.  ATI sponsors of IBT  studies  will
be notified of the results of the program  review.

1983 Program Request

     The Agency requests  a  total of $11,861,500 and 92.6  permanent workyears  for
this program, of  which $4,470,900  is  for the Salaries  and Expenses appropriation
and $7,390,600 is  for  the  Abatement,  Control  and  Compliance appropriation.  This
represents a  decrease  of  $517,100  and an  increase- of  $335,300  respectively.
                                      P-38

-------
Revamping  the  RPAR process to  preclude use  of  the  full  formal  process,  unless
all other options  (e.g., voluntary actions by the manufacturer) have been exhaust-
ed, accounts  for the decrease  in  Salaries  and Expenses.  At the same time, there
will be  increased  reliance on  contractors to  obtain  data  on the  economic  and
technological aspects of regulatory options.

     Final resolutions  are expected   for  approximately  six  chemicals.   These
chemicals  represent the  last  of those  identified  as RPAR  candidates  during  the
early 1970's.  New candidates for  review will come primarily from the registration
standards  program.  More emphasis will  be placed  on  industry  negotiations  and
voluntary  Industry  action.   Early  notification  to  registrants  of the  grounds
for issuance  of prospective decisions  will  give them  a greater  opportunity to
negotiate with  the Agency  to   determine  whether  additional   data  could  reduce
Agency concerns or whether  voluntary  actions  could reduce exposure to a level at
which unreasonable risk  does not  exist.  This approach  is  expected  to  result in
simpler, more  focused  RPAR documents  for  those remaining  problems for which  a
formal process  is  necessary.  The  Agency will  consider a wide  range of feasible
regulatory options  before  resorting   to   cancellation,  thereby  decreasing  the
frequency of  administrative hearings.   The process  will  continue to rely  on
contractors to supplement Agency workyears where necessary, Including the develop-
ment of preliminary risk assessments by contract.

     Technical support  is  estimated  to be  required for one hearing  resulting
from RPAR  decisions.    A total  of  18  laboratory   data audits  are  projected.
Laboratories will  be audited  only as  problems are identified.   Urban Integrated
pest management activities  will be funded  by  this  program beginning in 1983.   In
1982, and  prior years,  Integrated pest management activities were  funded  in  the
registration standards program.

RPAR REVIEWS-EMVIRQNMENTAL  IMPACT^STATEMENT PREPARATION

1981 AccoCTp 11 shtnents

     In 1981, the  Agency  obligated $125,800 for  the  Salaries and Expenses appro-
priation.  These activities included the preparation  of statements which deline-
ate the impact on humans and/or the environment due to the exposure to a chemical
which will  be  allowed  for full  use  or  restricted through  the RPAR  process.

1982 Explanation of Changes from January Budget Estimate

                     January          March          Current
                    Estimate         Estimate        Estimate

                    $105,100         $105,100        $105,100

These is no change to this activity.

1982 Program

     In 1982, the Agency 1s  allocating a total of $105,100 and 2.8 permanent work-
years to this program,  all  of  which 1s for Salaries  and Expenses appropriation.
Activities for 1982 are basically the  same as those conducted in 1981.

1983 Program Request

     The Agency requests a  total  of $105,400 and 3.0 permanent workyears,  all of
which is In the Salaries  and  Expenses appropriation.  Activities planned in 1983
are basically the  same as those conducted in 1981.
                                      P-39

-------
                                              PESTICIDES

                                  Federal And State Program Support

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Pesticides Use
Management
 Salaries S Expenses
 Abatement Control 8
 Compliance
              $633.3     $540.9     $456.1     $513.7
               $64.4      $50.8
                                                     -$513.7
TOTAL:
 Salaries S Expenses
 Abatement Control 8
 Compliance

Federal And State
Program Support
TOTAL
$633.3     $540.9     $456.1     $513.7
 $64.4


$697.7     $591.7     $456.1     $513.7
                                                                   -$513.7
                             -$513.7
PERMANENT FULL-TIf€ WORKYEARS
Pesticides Use
Management

TOTAL PERMANENT WORKYEARS
                16.0
                16.0
             14.1
             14.1
14.1
14.1
13.0
13.0
-13.0


-13.0

-------
                                              PESTICIDES

                                  Federal And State Program Support
                                     ACTUAL
                                      1981
        JANUARY
        ESTIMATE
          1982
         MARCH
        ESTIMATE
          1982
        CURRENT   ESTIMATE INCREASE +•
        ESTIMATE    19fl3   DECREASE -
          1982            1983 VS 1982
TOTAL WORKYEARS
Pesticides Use
Management
17.1
16.0
16.0
14.9
-14.9
TOTAL HORKYEARS
17-.1
16.0
16.0
14.9
-14.9

-------
                                    PESTICIDES

                        Federal and State Program Support
Budget Request
     The Agency  requests  no funds or  permanent  workyears for 1983.  By  the end
of 1982, the pesticide use management program activities  will  be integrated into
other pesticide  programs.   This will  enable  direct consultation between  Agency
headquarters technical  specialists  (who have  intimate,  firsthand  knowledge  of
pesticide regulatory  policies,   processes,  and  actions)  and  State  and  local
officials, pesticide  producers,  and pesticide  users.   This  will  expedite  the
exchange of  information,  advice, and  assistance on  matters  of  concern  to  the
pesticide community.

Program Descr i pti on

     This program  includes  consultation  and  the   exchange  of  information  and
technical advice between the Agency and Federal, State, and  local officials with
Interests in  pesticide  regulation,  as well  as assistance  to pesticide  users,
pesticide producers, and the general public to promote  compliance with  pesticide
regulations and safe use practices.

PESTICIDE USE MANAGEMENT

1981 Accomplishments

     In 1981,  a total  of $697,700  was obligated,  including $633,300 for  the
Salaries and  Expenses appropriation  and $64,400 for  the  Abatement,  Control  and
Compliance appropriation.   The  program  provided  Regional  offices  with  program
documentation and guidance  on  Agency programs  and  policies regarding  pesticide
registration, regulatory requirements,  and  pesticide  Incidents  requiring  Agency
technical expertise.  Information and referral  services  were provided  to Federal,
State, and local agencies;  trade organizations; poison control centers; hospitals;
physicians; and worker clinics  in dealing with pesticide problems.

1982 Expl anation of Changes from January Budget Estimate

                    January          March          Current
                    Estimate         Estimate        Estimate

                    $591,700         $456,100        $513,700

     The net  decrease of  -$78,000  results  from  several  actions,  as  follows:

     -  January - March.   (•$135,600)   This  request  represented a  decrease  of
     5135,500 from  the  January budget,  of  which $84,800 was  for  Salaries  and
     Expenses, and 550,800 was  for  Abatement,  Control  and  Compliance.  The  de-
     crease In Salaries  and Expenses will  be accomplished  by a  reduction In lower
     priority travel, consultant services, and printing.  The  decrease  in  Abate-
     ment, Control, and  Compliance will be accomplished by the elimination of some
     support to the promotion of integrated pest management and farm safety activi-
     ties,  This support can be adequately  furnished  by in-house  capabilities at
     Agency headquarters.
                         (+$59,900)  During the development of the operating plan,
     several mi scelYaheous reprogrammlngs, which are not  reportable  to  Congress,
     were made to  this activity  and  resulted  in  a  net  increase  of  +$59,900.

     -  Congressi onal Actions .  (-$3,100)  A reduction of -$3,100 was applied to
     the salaries  and Expenses  appropriation  to  meet  Congressional ly  mandated
     appropriation levels.
                                     P-42

-------
     -  Transfer Authority.  (+$800)  The  net  increase applied to  this  activity
     Includesan increase of +$800  to  Salaries and Expenses for essential  oper-
     ating costs.

1982 Program

    In 1982, the  Agency  is  allocating a  total  of $513,700  and 13.0 permanent
workyears to this  program, all of which  is for Salaries and Expenses appropriation.
Activities planned for  1982  are basically  similar to those  conducted in  1981.

1983 Program Request

    The Agency requests no funds or permanent  workyears  for 1983.   By  the end  of
1982, the pesticide  use management program activities  will  be Integrated  into
other functional programs to  ensure that States and other  interested parties can
still be served efficiently and effectively.
                                       P-43

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                              PESTICIDES

                                        Pesticides Enforcement

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Pesticides
Enforcement
 Salaries £ Expenses
 Abatement Control &
 Compliance

Pesticides
Enforcement Grants
 Salaries & Expenses
 Abatement Control I
 Compllance

Pesticides
Certification &
Training
 Abatement Control £
 Compliance
                                   $3,949.0   $4,902.7   $4,454.5   $4,282.1   $3,670.1   -$612.0
                                      $61.8      $61.6      $61.6      $49.7      $45.3     -$4.4
                                   $8,013.5   $8,701.9   $8,701.9   $8,701.9   $6,918.4 -$1,783.5
                                   $2,951.8   $2,500.0   $2,500.0   $2,500.0   $2,000.0   -$SOO.O
TOTAL:
 Salaries 8 Expenses
 Abatement Control &
 Compliance

Pesticides Enforcement TOTAL
                                   $3,949.0   $4,902.7   $4,454.5   $4,282.1   $3,670.1   -$612.0
                                  $11,027.1  $11,263.5  $11,263.5  $11,251.6   $8,963.7 -$2,287.9
                                  $14,976.1  $16,166.2  $15,718.0  $15,533.7  $12,633.8 -$2,899.9

-------
                                              PESTICIDES

                                        Pesticides Enforcement

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME WORKYEARS
Pesticides
Enforcement
TJ
*; TOTAL PERMANENT WORKYEARS
TOTAL WORK YEARS
Pesticides
Enforcement

114.2 135.5 125.3 116.2 96.6 -19.6
114.2 135.5 125.3 116.2 96.6 -19.6

126.3 151.0 138.4 128.9 104.7 -24.2
TOTAL WORKYEARS                       126.3      151.0      138.4      128.9      104.7     -24.2

-------
                                    PESTICIDES

                              Pesticides Enforcement

Budget Request

     The Agency requests  a  total  of $12,633,800 and 96.6 permanent workyears  for
1983, a decrease of $2,899,900 and  19.6 permanent workyears  from 1982.   Included
in this  total  is  53,670,100 for  the Salaries  and  Expenses  appropriation  and
$8,963,700 for Abatement, Control  and Compliance appropriation, with a  decrease
of 5612,000  and  $2,287,900  respectively.  The  reduction  reflects  a  shift  in
emphasis from Federal to  State enforcement  and a transfer  of legal activities to
the new Office of Legal and Enforcement Counsel.

Program Description

     This activity includes  monitoring the pesticide industry — including  pro-
ducers, distributers  and  users  —  for  compliance  with the  Federal  Insecticide,
Fungicide, and Rodenticide  Act  (FIFRA);  providing  compliance assistance  to  the
regulated community;  and preparing and issuing,  where compliance first cannot be
gained by  other  means,  notices  of violation and  administrative orders.   Also
involved in  this  activity  is the management and  funding of  State cooperative
enforcement agreements  and   State   certification  and  training  programs.   As  a
result of Federal/State agreements,  the program is conducted largely by  coopera-
ting State agencies.

     Pesticides Enforcement — The  EPA  pesticides  enforcement  program  covers
approximately lo,QOQ fTrms  involved  in  the  production  of  pesticides  sold  and
distributed in the United States  and millions of persons  using  those pesticides.
The program  emphasizes  gaining  compliance  by the  pesticide Industry  and users
with registration, classification, and labeling requirements.

     The pesticide enforcement program will  prepare and issue notices of  viola-
tions and  administrative  orders  in Instances where  compliance  by  other means
first cannot be achieved.   Also,  the enforcement program will assist and  support
the Office of  Legal  and Enforcement Counsel  (OLEC) in  the development  of civil
and criminal  referrals.

     The EPA pesticide  enforcement program also provides  compliance assistance
to the agricultural chemicals Industry, commercial  and private  applicators,  user
groups, and  States to  help  them gain  product registrations, special local  need
registrations,  emergency exemptions  and to understand and  meet their obligations
under FIFRA.

     In addition, EPA  is  striving  to  ensure  that  State governments participate
to the maximum extent  in  the  national  pesticides compliance  program. The  Agency
has worked  with   the  States  to  implement cooperative  Federal/State programs,
particularly in  establishing  cooperative  grants,   and  applicator certification
and training programs.  With  State participation,  the breadth  and effectiveness
of the compliance programs  have been greatly  enhanced,  the control   over the  use
of pesticides has improved, and increased  responsiveness to  local needs  has  been
realized.  To  this  end,  EPA provides oversight  and  management to cooperative
grants-in-aid and State certification and  training  programs.

     Pesticide Enforcement Grants  —  Pesticide  enforcement   grants, funded   by
EPA, provide for  the  bulk  of pesticide  compliance  monitoring activities  in  the
United States.   Under the terms of these cooperative agreements, States  Inspect
pesticide producer establishments;  provide marketplace  surveillance; Investigate
pesticide use,  misuse,  and  field  reentry questions.  The agreements  also  fund
States in  surveying  pesticide imports, inspecting  pesticide dealer  records  and
reviewing commercial  applicator  records.
                                      P-46

-------
     Pesticides Certification and Training — Pesticides certification and train-
ing insures that  highly toxic, restricted  use pesticides are handled,  applied,
and stored  only by  competent, trained applicators.   The Agency  provides  funds
which are split equally  between  the training program and the  certification  pro-
gram.  Funds  for  training  applicators are  transferred  to  the  U.S.  Department
of Agriculture for distribution to State Cooperative Extension Services.  Certifi-
cation funds are distributed through grants  to designated State  agencies.   Funds
are used  by the  States for  certification  activities,  such  as developing  and
grading exams, Issuing  credentials,  monitoring training, and  keeping  records of
certified applicators.  EPA also  provides  funding for Federal certification  and
training programs in  Colorado  and Nebraska,  two States  that have  elected  not to
conduct their own certification and training programs.

PESTICIDES ENFORCEMENT

1981 Accomplishments

      In 1981, resources obligated were  $4,010,800,  of  which  $3,949,000 was  for
the Salaries  and   Expenses  appropriation  and  $61,800  was  for  the  Abatement,
Control and Compliance  appropriation.  Contract funds  were  used  to develop  a
compliance manual, to evaluate the effectiveness of  the State grant  program, to
train for the laboratory inspection program, and  for  ADP support to  store annual
pesticide production data as required under Section 7  of the  Federal  Insecticide,
Fungicide, and Rodenticide Act (FIFRA).

     During 1981,  the EPA federal  compliance monitoring  program  accomplished the
following: 287  Inspections  of pesticide  producing establishments;  485 use  and
reentry inspections; 241 inspections at ports  of entry; 291 marketplace  inspec-
tions; and  4  laboratory inspection  audits.   As a  result of  these  and  States'
efforts, the  Agency  issued 154  administrative  orders   for  product/producer  use
violations.   Notices of Judgment  were  also  published  by the  Agency detailing the
legal disposition of those administrative orders  and  criminal  actions instituted
under FIFRA.

     EPA also provided management  and  oversight  to 51 cooperative  agreements and
52 State  certification  and  training programs.   Training of  State personnel,  as
part of these  cooperative  agreements,  was provided to inspectors, chemists,  and
case preparation officers.

1982 Explanation of Changes  from January  Budget Estimate

                    January           March            Current
                    Estimate         Estimate         Estimate

                   54,424,200       $4,226,000        $4,331,800

     The net  decrease of  -$92,400  results  from  several actions,  as  follows:

                -March.  (-$114,800)   This  change   represented  a  decrease  of
                      "
     5114,800 from  lie"  January  budget,  a.ll  of  which  was  for  Salaries  and
     Expenses.

     ~  Reorganization.   (-$83,400)   These  resources  were moved to  Technical
     Support -  Office of  Legal  and  Enforcement  Counsel  (National  Enforcement
     Investigation Center -  NEICK   The  functions  supported by these  resources
     remain the  same; the  new program  element  for NEIC  was  created,  (a)  so
     that their  resources  could  be more  readily  identified  and,  (b)  organiza-
     tionally, the center  now falls under  the responsibility  of  the  Office  of
     Legal and  Enforcement  Counsel.   As  a  result  of  an Agency  restructuring,
     these resources  were later  moved to  the  Interdisciplinary  program  under
     one program  element.   This  reflects  the  consolidation   of  these  similar
     activities providing  quick  technical   response  in  emergency  situations.
                                       P-47

-------
     "  ^strnicturing.   (+$290,100)   This   restructuring   transferred   support
     resources from1" pesticides   grants   Into this  program  to  consolidate  the
     support resources  of  the   functionally-related  activities  for  pesticides
     certification and training  and pesticides enforcement  grants.

     ~  Deprogramming.   (-$2,700)   An   Agency-wide  reprogramiiiing  of  -$62,600
     provided resources  for  transfer   of the  accountability  function  to  the
     Office of  Management  Systems  and  Evaluation  and,   in  addition,  provided
     additional resources  for  the  Immediate  Office  of  the  Assistant  Admin-
     istrator for  Solid  Waste   and  Emergency  Response.    (This   reprogramming
     was included in the letter  to Congress on December 16, 1981).

     During the development  of  the  operating plan, several miscellaneous repro-
     grammings, which are not reportable  to  Congress,  were made to this  activity
     and resulted in a net increase of +$59,900.

     -  Congressional Actions.   (-$198,800)   A reduction  of  -$11,900 was  taken
     against the March  estimate  reflecting  the  September  1.2%  reduction  to  the
     Abatement, Control,  and Compliance  appropriation.    This reduction will
     result in  a  postponement   in  completing  either  the Policy  or  the Case
     Decision Compendia.   In addition,  contractor  assistance in  developing,
     formatting and  printing  the inspection  and Case  Development manuals will
     be reduced.

     An additional  reduction of  -$186,900 was applied  to the  Salaries and Expen-
     ses appropriation  to  meet  Congressionally mandated  appropriation  levels.

     -  Transfer Authority.    (+$17,200)   The   net   increase   applied  to this
     activity 1 ncltitles' an increase of +$17,200 to  Salaries  and  Expenses  to cover
     essential operating costs,

1982 Program

     In 1982, the Agency 1s  allocating  a total  of $4,331,800  and 116.2 permanent
workyears to this program,  of which  $4,282,100  is  for Salaries and Expenses  and
349,700 is  for extramural  purposes under the  Abatement,  Control  and  Compliance
Appropriation.  Contract funds will  be  used for updating  the compliance manual,
specialized compliance monitoring, and  for ADP  support to  store annual pesticide
production data.

     The first priority  of  the  pesticides enforcement program  is  developing  and
enhancing the cooperative programs between EPA and the States.  To further this
end, the  Agency  continues  to manage  57  cooperative  enforcement  agreements  and
54 State  certification  and  training  programs.  Training of State  personnel also
continues.  Federal  compliance monitoring  activities in those  States not partic-
ipating in the  grant program and in those  States  with problems which the State
cannot adequately address Include 485 use,  reentry,  and experimental use inspec-
tions.  Product and  producer  compliance activities conducted by EPA  include  287
establishment inspections, 291 marketplace  inspections, 12  laboratory inspection
audits, and 200 inspections at ports of entry.  EPA  efforts  also include preparing
and issuing notices of violations and administrative orders.

1983 Program Request

     The Agency requests a  total  of $3,715,400 and 96.6 permanent workyears  for
this program, for which  $3,670,100 is for the Salaries  and Expenses  appropriation,
and $45,300 is for  the Abatement, Control and Compliance appropriation.  The total
reflects an  overall  decrease of $616,400.  This  decrease in  federal  resources
reflects increased participation by States, Territories and Indian Tribes in  the
cooperative grant program.

     In 1983,  the  first priority of the  pesticides  enforcement program  will  be
                                      p-48

-------
continued cooperation  with  States.   Emphasis will  also be  placed  upon  achieving
compliance with  pesticide   use  and  application  rules  and upon  enhancement  of
overall compliance  with  FIFRA  through cooperative agreements.  As  a  consequence
of this enhanced  State  role  In the  overall program,  the primary Federal  role
will continue to be  In program  management  and training.   The  enforcement program
will include the  oversight  of  State  cooperative  agreements and applicator  cer-
tification and training  programs,  administration  of Federal applicator  certifi-
cation and training programs  in  Colorado and  Nebraska,  and  administration  of
certification and training programs among Indian Tribes.

     In addition,  the pesticide  enforcement  program  is  committed  to  provide
compliance assistance  to:   the agricultural  chemical  Industry;  commercial  and
private applicators; user groups; and States to assist them in  obtaining product
registrations, experimental  use permits, special local  need registrations,  emer-
gency exemptions, and  to understand  and meet their  obligations  under  FIFRA.   The
program will   continue  to provide  technical assistance to  major pest  eradication
programs,  such as the  widespread treatment for gypsy moths  and  spruce budworm on
public lands.

     EPA user compliance activities in those States with problems which  the State
cannot adequately address  will  include  121  use,   reentry,  and experimental  use
inspections.   Product  and producer  compliance activities  conducted by  EPA  will
include 72 establishment inspections,  73 marketplace  inspections,  40  lab audits,
and 80  inspections  at ports  of  entry.    The reductions  in  Federal   compliance
monitoring reflects  a  shift in emphasis to  compliance assistance  for the  regu-
lated community.  Providing assistance  should help preclude the need for future
enforcement activity in  most  instances.   The pesticide enforcement program  will
also prepare and  issue notices  of violation and administrative orders,  with the
concurrence of the Office of Legal and Enforcement Counsel (OLEC).  In  addition,
the program  will  assist  and support  OLEC  in the development of those  civil  and
criminal referrals as warranted.

PESTICIDEENFORCEMENT GRANTS

1981 Accompli shments

     In 1981, the Agency  obligated $8,013,500, all of which 1s under the Abatement,
Control and  Compliance appropriation for  cooperative  agreements with 51  States
and Territories*  This funding  provides  resources  for States to conduct:   2,538
establishment inspections;  10,436 use  and  reentry  inspections;  7,171  marketplace
inspections;  10,928 applicator  license and record inspections; and 6,937 dealer
record inspections.

1982 Explanation of ChangesfromJanuaryBudget Estimate

                    January           March             Current
                    Estimate         Estimate         Estimate

                   $9,242,000        $8,992,000      $8,701,900

     The net  decrease  of -$540,100  results  from  several  actions,  as  follows:

     -  January - March.    (-$52,700)  This   change  represented  a decrease  of
     $52,700 from the January  budget, all  of which  was for Salaries and  Expenses.

     -  Reorgani zation.   (-$197,300)   These  resources were  moved to  Technical
     Support - Office  of Legal  Enforcement  Counsel (National Enforcement Inves-
     tigation Center  -  NEIC).    The  functions   supported by   these  resources
     remain the  same;  the  new program  element for   NEIC  was  created,  (a)  so
     that their resources  could be  more  readily identified  and,   (b)  organiza-
     tionally, the  center now  falls  under the responsibility  of  the Office of
     Legal and  Enforcement  Counsel.   As   a  result of an Agency  restructuring,
     these resources  were  later  moved to the  Interdisciplinary  program  under
                                     P-49

-------
     one program  element.   This  reflects  the  consolidation  of  these  similar
     activities providing "quick  technical   response  in  emergency  situations.

     "  Restructuring.  (-5290,100) This restructuring will transfer resources to
     the Pesticides Enforcement  program to  combine  the  support of the pesticides
     enforcement grants under  the same  structure  as  the support  of pesticides
     certification and training  grants.  This consolidation  of these  functional"
     ly related  resources will provide for  better  management and accountfbility
     of these related activities.

1982 Program

     In 1982,  the  Agency is allocating $3,701,900,  all  of  which is  under  the
Abatement, Control   and  Compliance  appropriation,  for  cooperative  enforcement
grants with 57 States  and Territories.   In  1982,  these  agreements  stress  compli-
ance with  pesticide  use  and  application  regulations, and  improvement of  State
program priority-setting  methodologies.   As  in  previous  years,  the pesticides
enforcement program will  foster user compliance with label  directions  and  manu-
facturer adherence  to  product formulation  requirements  under  FIFRA.   With this
level of  funding,  States will  conduct  2,766  pesticide producer  establishment
inspections; 11,375 use and reentry investigations;  7816 marketplace inspections;
11,912 applicator  license  and  record  inspections;   and  7,561  dealer   record
Inspections.

1983 Program Request

     The Agency  requests  a  total  of $6,913,400,  all  of which  is  for the Abate-
ment, Control  and  Compliance  appropriation.  This  is a decrease  of  $1,783,500.
While this decrease will  result in the reduction in  the total  amount of  compli-
ance monitoring  activity, improvements  in   State priority  setting  will   direct
available resources toward those aspects of pesticide  use that have  been  asso-
ciated with the greatest harm to public health or the environment.

     As part of the 57 cooperative enforcement agreements, States and Territories
will determine their own  local  program priorities and use the resources provided
to act upon these priorities.  State  compliance monitoring activities will  include
2,213 pesticide producer  establishment  and  6,253 marketplace inspections;  9,100
use and reentry  investigations;  9,530  applicator license and record inspections;
and 6,049 dealer record inspections.

PESTICIDES _CERTIFICATION AND .TRAINIMG

1981 Accomplishments

    In 1981,  resources obligated  were $2,951,800,  all  of  which  is under  the
Abatement, Control  and Compliance appropriation, for funding  certification  and
training programs  in  52  States  and  Territories.   In addition,  resources  funded
Federal programs in Colorado and  Nebraska.   These funds  will  support  the  certif-
ication and training of applicators of restricted use pesticides.

1982 Explanation of Changes from January Budget Estimate

                    January          March            Current
                    Estimate         Estimate         Estimate

                   $2,500,000       $2,500,000       $2,500,000

     The following  actions   resulted in  no  change  to  this program  activity.

     -  Congressional Actions. (--$1,050,000) A reduction of -$1,050,000 was  taken
     against the March estimate  reflecting  the  September  12% reduction  to  the
     Abatement, Control,  and  Compliance  appropriation.   Congress  subsequently
     added back +$1,050,000  to this  activity as part of the  final  action on  our
     1982 Appropriations Bill.
                                      P-50

-------
1982 Program

     In 1982, the  Agency is  allocating  $2,500,000,  all  for  the  Abatement,  Con-
trol and Compliance  appropriation,  for certification and  training  programs  with
54 States  and  Territories.    In  addition,  these  funds  support Federal  certifi-
cation and training programs in Colorado and Nebraska.  These funds will continue
to support certification and training  1n  the  application  of highly  toxic,  re-
stricted use pesticides.

1983 Program Request

     The Agency requests a total of $2,000,000  for this  program,  all  of which is
for the Abatement,  Control  and Compliance appropriation.  The  program will  sup-
port 55 applicator certification and  training  programs  in States and Territories
and Federally  run  programs   in  Colorado  and  Nebraska.   This  is  a decrease  of
5500,000 to  be  taken equally  between the  certification and  training programs.
States will  be  encouraged to raise or  implement fees to offset  the  decrease in
Federal spending.   In  addition, EPA  will  assist States  in  designing improved
training materials.
                                       P-51

-------
Radiation
   SECTION TAB

-------
Page Intentionally Blank

-------
RADIATION


APPROPRIATION
Salaries 8 Expenses
Abatement Control 1
Compliance
Research 8 Development
TOTAL, Radiation
PERMANENT FULL-TIME HORKYEARS
TOTAL WORK YEARS
OUTLAYS
AUTHORIZATION LEVELS
PROGRAM HIGHLIGHTS
Nonlonlzlng Radiation
Non-Energy
Salaries S Expenses
Research & Development
Salaries & Expenses
Research & Development
RESEARCH » DEVELOPMENT TOTAL
ACTUAL
1981


$8,694.0
$4,834.1

$700.5
$14,228.6
187.3
218.4
$12,998.3
$3,181.0



$1,676.1
$700.5
$1,676.1
$700.5
$2,376.6
JANUARY
ESTIMATE
1982
{DOLLARS

$11,407.7
$4,737.2

$825.0
$16,969.9
206.0
241.6
$17,082.0




$2,329.3
$825.0
$2,329.3
$825.0
$3,154.3
MARCH
ESTIMATE
1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
IN THOUSANDS)

$9,794.2
$2,322.9

$770.7
$12,887.8
160.0
191.4
$15,705.0




$2,211.7
$770.7
$2,211.7
$770.7
$2,982.4

$8,291.1
$1,394.7

$692.9
$10,378.7
149.3
178.6
$11,424.0




$1,852.3
$692.9
$1,852.3
$692.9
$2,545.2

$7,917.8
$2,195.7

$237.6
$10,351.1
135.1
159.9
$11,147.0




$1,348.8
$237.6
$1,348.8
$237.6
$1,586.4

-$373.3
$801.0

-$455.3
-$27.6
-14.2
-18.7
-$277.0




-$503.5
-$455.3
-$503.5
-$455.3
-$958.8

-------
                                             RADIATION


Radiation Policy
Council
Salaries & Expenses
Abatement Control A
Compliance
Radiation Criteria,
Standards S Guidelines
Salaries & Expenses
Abatement Control 8
Compl lance
Radiation Program
Implementation
Salaries & Expenses
Radiation
Environmental Impact Assessment
Salaries * Expenses
Abatement Control S
Compl 1 ance
Salaries & Expenses
Abatement Control 4
ACTUAL
1981



$281,7




$2,209.7
$3,334.9



$601.4


$3,925,1
$1,499.2

$7,017.9
$4,834.1
JANUARY
ESTIHATE
1982
(DOLLARS


$488,9
$492.0



$3,359.4
$3,425.4



$596.3


$4,633.8
$819.8

$9,078.4
$4,737.2
MARCH
ESTIHATE
1982
IN THOUSANDS)







$3,017.4
$1,563.6



$596.3


$3,968.8
$759.3

$7,582.5
$2,322.9
CURRENT
ESTIMATE
1982








$2,515.9
$1,044.7



$580.0


$3,342.9
$350.0

$6,438.8
$1.394.7
ESTIMATE
1983








$3,167.8
$1,595.7



$628.6


$2,772.6
$600.0

$6,569.0
$2,195.7
INCREASE +
DECREASE -
1983 VS 1982








$651.9
$551.0



$48.6


-$570.3
$250.0

$130.2
$801.0
 Compliance
ABATEMENT & CONTROL
TOTAL  $11,852.0  $13,815.6   $9,905.4   $7,833.5   $8,764.7
$931.2

-------
                                              RADIATION

TOTAL PERMANENT WORKYEARS
Nonlonlzfng Radiation '
Non-Energy
RESEARCH 8 DEVELOPMENT TOTAL
Radiation Policy
Council
Radiation Criteria,
Standards & Guidelines
Radiation Program
Implementation
Radiation
Environmental Impact
ABATEMENT « CONTROL TOTAL
TOTAL WORKYEARS
Nonlonlzlng Radiation
Non-Energy
RESEARCH « DEVELOPMENT TOTAL
Radiation Policy
ACTUAL
1981

34,5
34.5
1.9
44.6
13.4
92.9
152.8

40.3
40.3
4.3
JANUARY
ESTIMATE
1982

31.2
31.2
9.0
66.0
14.8
85.0
174.8

37.0
37.0
12.0
MARCH CURRENT ESTIMATE INCREASE +
ESTIMATE ESTIMATE 1983 DECREASE -
1982 1982 1983 VS 1982

28.0 22.2 21.0 -1.2
28.0 22.2 21.0 -1.2

55.2 53.2 55.2 2.0
14.8 13.9 10.0 -3.9
62.0 60.0 48.9 -11.1
132.0 127.1 114.1 -13.0

33.8 28.0 25.4 -2.6
33.8 28.0 25.4 -2.6

Council

-------
         RADIATION
ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
 1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
            1982       1982       1982            1983 VS 1982
Radiation Criteria,
Standards & Guidelines
Radiation Program
Implementation
Radiation
Environmental Impact
ABATEMENT & CONTROL TOTAL
52.5

15.3

106.0

178.1
79.0

16.6

97.0

204.6
67.0

16.6

74.0

157.6
64.0

15.6

71.0

150.6
65.4

11.1

58.0

134.5
1.4

-4.5

-13.0

-16.1

-------
                                  RADIATION
OVERVIEW AND STRATEGY

     EPA's mandate  to protect  the public  health  and  environment from  adverse
effects of radiation  exposure  derives  from (1) the Federal  guidance  and  general
environmental standard authorities  under the  Atomic  Energy Act,  transferred  to
EPA by Reorganization Plan  #3  of 1970; (2) the Clean A1r Act  Amendments  of 1977
which provide  authority  to  regulate  radioactive air pollutants  through  the
Act's standard setting  authorities;  (3) the  Resource Conservation and  Recovery
Act (RCRA) and  the Uranium  Mill  Tailings Radiation  Control  Act  (UMTRCA)  which
charge EPA with  providing  standards  for  protection  from  waste  materials  with
radioactive content;  and  (4) other  authorities contained  1n  the Federal  Mater
Pollution Control Act, the  Marine Protection  Research  and Sanctuaries Act,  the
Safe Drink-Ing Water Act,  the Public Health Service Act,  and the National  Environ-
mental Policy Act.

     These legislative authorities  generally prescribe an  environmental  assess-
ment, technology assessment, and  standard setting role for EPA.   In  some  cases
enforcement responsibilities are  given  to  other  agencies,  notably  the  Nuclear
Regulatory Commission.  In these Instances EPA performs  some oversight functions
to Insure that established standards and guidance are Implemented.

     Efforts have been  Initiated 1n 1981  and  1982 to  significantly  sharpen  the
focus of  the EPA radiation  regulatory program.  This effort has  resulted 1n the
deferral  of  lower priority  actions  to  provide for  the  full  concentration  of
staff and  resources  on  areas   of  highest priority.  High  priorities have  been
given to  activities  associated with  radioactive  waste management,  activities
mandated by the Clean Air Act  of 1977, and the provision of Federal  guidance for
general occupation exposure and for nonionizing radiation.

     EPA's 1982  and  1983  effort on  radioactive  waste  will  Include  the  proposal
and promulgation of  standards  for high level waste, the proposal  of  standards  to
address low level waste,  completion  of standards  for uranium mill tailings,  and
work on ocean disposal for special  classes of wastes.

     Clean Air Act  related  work  has  been  concentrated  on characterizing  the
hazards of airborne radlonuclldes and the establishment of  regulatory priorities.
In 1983 we expect to  propose standards for one class of sources  emitting radlo-
nuclldes to the ambient air.

     EPA's radiation research and development program stresses  the Identification
and evaluation of health  effects of  chronic low-level  exposures  to  nonionizing
radiation.  This research serves to  fill  gaps in Federal research on nonionizing
radiation (NIR)  and  Is in support of  establishment  of Federal guidance  in this
area.  Health risks will  be addressed by establishing dose-response and threshold
data 1n animal  model  systems.  This effort is aimed at Improving the understanding
of Interaction of NIR with  biological  systems.  A second  major component of EPA
radiation research  activities  is  a monitoring program  which assesses population
exposure to  off-site releases   associated with operation of nuclear  test sites.
The EPA radiation research  budget  will also provide quality assurance for radio-
chemical  analysis.
                                        R-5

-------
                                RADIATION


SUMMARY OF INCREASES AND DECREASES

                                                         (in thousands  of dollars)

     1982 Radiation Program	             $10,378.7

        Salaries and Expenses	                -373.3

        The net decrease reflects personnel  reductions
        associated with the consolidation of EIS activi-
        ties in the Interdisciplinary and program and
        completion of some health effects  studies  in
        1982, partially offset by an increase in radia-
        tion standards setting activities.

        Research and Development	.	                -455.3

        The net decrease reflects completion of some
        health effects studies in 1982.

        Abatement, Control  and Compliance	                +801.0

        The net increase reflects activities associated
        with the analysis, development,  and environ-
        mental sampling required for standards setting.

     1983 Radiation Program.	,	             $10,351.1


SUMMARY OF CHANGES TO JANUARY;J982 BUDGET^ ESTIMATE

                                                         (in thousands  of dollars)

     January 1982 Estimate	             516,969.9

        January-March...	              -4,082.1

        Reprogrammings	,	                +18.3

        Congressional  Actions	              -2,528.1

        A decrease of $520.200  to Abatement, Control
        and Compliance was  taken against  the March est-
        imate to reflect the  September 12%  reduction.
        An additional  reduction of $2,007,900 was app-
        lied to the Salaries  and Expenses (SI.827,900),
        and Abatement, Control and Compliance ($180,000)
        apprlations to meet  Congressional ly mandated
        appropriation levels.

        Transfer Authority	                   +.7

        A net increase of $700 was transferred to this
        program as follows:  $228,000  was transferred
        from Abatement,  Control and  Compliance;  577,800
        was transferred from  Research and Development;
        and $306,500 was transferred  to  Salaries  and
        Expenses.

     Current 1982 Estimate	»..             $10,378.7
                                       R-6

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                              RADIATION

                                   Nonlonlzlng Radiation Non-Energy
                                     ACTUAL
                                      1981
            JANUARY
            ESTIMATE
              1982
          MARCH
         ESTIMATE
           1982
         CURRENT   ESTIMATE INCREASE +
         ESTIMATE    1983   DECREASE -
           1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Technical Information
ft Liaison
 Salaries ft Expenses
 Research ft Development

Monitoring Systems *
Quality Assurance
 Salaries & Expenses
 Research & Development

Health Effects
 Salaries S Expenses
 Research ft Development
   $62.4
  $152.3
   $76.8
$71.2
 $1.7
$92.6
$15.7
$63.7
 $1.7
$92.3
$15.4
$55.9
$92.3
$15.4
 $10.7    -$45.2
$174.6
 $16.7
$1,461.4   $2,165.5   $2,055.7   $1,704.1   $1,163.5
  $623.7     $807.6     $753.6     $677.5     $220.9
$82.3
 $1.3
                                         -$540.6
                                         -$456.6
TOTAL:
 Salaries & Expenses
 Research & Development

Nonionlzlng Radiation  TOTAL
Non-Energy
$1,676.1   $2,329.3   $2,211.7   $1,852.3   $1,348.8   -$503.5
  $700.5     $825.0     $770.7     $692.9     $237.6   -$455.3

$2,376.6   $3,154.3   $2,982.4   $2,545.2   $1,586.4   -$958.8

-------
50
oo
                                                              RADIATION

                                                   Nonlon1z1ng Radiation Non-Energy

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                 1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME MOWCYEARS
Technical Information
A Liaison
Monitoring Systems &
Quality Assurance
Health Effects
TOTAL PERMANENT WQBCYEARS
TOTAL WORKYEARS
Technical Information
8 Liaison
Monitoring Systems £
Quality Assurance
Health Effects
TOTAL WORKYEARS

.6
2.9
31.0
34.5

1.2
3.3
35.8
40.3

.3 .3
2.8 2.8
28.1 24.9
31.2 28.0

.6 .6
2.8 2.8
33.6 30.4
37.0 33.8

.3
2.0
19.9
22.2

.6
2.0
25.4
28.0

-.3
5.0 3.0
16.0 -3.9
21.0 -1.2

-.6
5.0 3.0
20.4 -5.0
25.4 -2.6

-------
                                    RADIATION

                        Non-Ionizing Radiation Non-Energy
Budget Request
     The Agency requests a  total  of $1,586,400 and 21.0 permanent workyears  for
1983, a decrease of $958,800 and  1.2 permanent workyears  from 1982.   Included in
this total Is $1,348,800 for Salaries and Expenses and $237,600 for  Research  and
Development, a decrease  of  $503,500, and $455,300, respectively.  This  decrease
results from a  phasedown of  health effects research  due  to  the  completion  of
some studies in 1982.

Program Description

     The overall program endeavors  to   support  the production  of  the  Federal
Radiation Protection Guidance  by  expanding knowledge  of  the health  effects  and
health risks associated with non-ionizing radiation (NIR).     The program will
focus on establishing  biophysical  interactions and mechanisms  of  action and  on
developing models  to  predict  and  interpret the  significance  of  non-ionizing
radiation deposition for humans.   Also,  the  program  contains  a  monitoring  and
quality assurance component to provide support for  nuclear test program  require-
ments and a radiocheraical quality  assurance  program.

TECHNICAL INFORMATIONAND LIAISON

     Refer to the Oxidants Non-Energy narrative for a description of those Techni-
cal Information  and Liaison  activities  that  are  common to all   Research  and
Development budget sub-activities.  Activities  specific to  this budget sub-activ-
ity are indicated in the program element description below.

1981 Accomplishments

     In 1981, the Agency used  a total  of $62,400 for this program, all  of  which
was under the Salaries  and Expenses appropriation.

     for 1981, specific  products  in this program  included the Annual Report  to
DOD on Off-Site  Radiation  Safety for Nuclear Testing,  and a KWIC Index  Biblio-
graphy of the World's Literature on the  Health  Effects  of  MIR.
1982 Explanation of Changes from January Budget Estimate
                  January
                 Estimate

                 $72,900
  March
Estimate

$65.400
 Current
Estimate

$55,900
     The net  decrease  of  -$17,000  results  from  several  actions,  as  follows:

     -  January - March-   (-$7,500)  This change  represented  a  decrease  of $7,500
     from the January budget, all of which was for Salaries and Expenses,   This de-
     crease resulted in a fewer number of technical  Information publications that
     will be prepared and disseminated.

     -  Congressional Actions.   (-$9,500)  An additional  reduction  of  -$9,500 was
     applied to the  Salaries and  Expenses appropriation  to meet Congressionally
     mandated appropriation levels.

     -  Transfer Authority.  (No Change)   The net change  applied to this activity
     Is made  up  of  a  decrease of -$1,700 to  Research  and Development and  an
     Increase of +$1,700 to  Salaries and  Expenses.  The reductions are minimal
     and represent lower than anticipated  costs.   The  Salaries and Expenses in-
     crease will  cover essential  operating costs,   •
                                      R-9

-------
1982 Program

     In 1982, the Agency 1s allocating a total of $55,900, and .3 permanent work-
years to this  program,  all  of  which  1s under  the  Salaries and  Expenses appro-
priation.

     Specific accomplishments  In  the  area   of   radiation  Included  a  research
report on the Biological Effects  of Radiofrequency, and the Annual  Report to DOD
on Off-Site Radiation Safety for Nuclear Testing.

1983 Program Request

     The Agency requests a  total  of $10,700  and  no permanent  workyears for this
program, all  of  which is  under the  Salaries and  Expenses  appropriation.   This
reflects a  decrease  of  $45,200, resulting from a decision  to  reduce Information
dissemination and liaison support.

     In 1983, the Technical Information and Liaison program will stress providing
the necessary technical  Information to State and local  officials 1n  support  of
their Increased role 1n administering environmental  programs.

MONITORING SYSTEMS AND DUALITY ASSURANCE

1981 Accompl1shments

     In 1981,  the  Agency used  a total  of $229,100 for  this  program,  of  which
$152,300 was  under  the Salaries  and  Expenses appropriation and $76,800  was for
extramural purposes under the Research and Development appropriation.

     The monitoring  program has  two  primary focuses.  The  first Is  to conduct
a racUochenrical  analytical   quality  assurance  program  1n   support  of  Federal,
Regional, State and  local  laboratories which assess radionuclide activities  1n
air, water, milk and food as a result of nuclear facility activities.  The second
focus 1s  the  operation  of  a  comprehensive  off-site  radiological  surveillance
program at the Nevada Test Site to support the on-site nuclear testing activities
of the  Department  of  Energy  (DOE).  This  second  function  1s operated  under a
Memorandum of Understanding with the DOE.

     The 1981  Monitoring and  Quality  Assurance  program In  radiation  Included
the following:

     - An  Integrated method  for  measurements   of   six  actinides 1n  water  was
       evaluated, single laboratory tested and  the   final report prepared.   This
       provides a valuable  tool  for radionuclide measurement for the analysis of
       samples of water, urine, milk etc.

     - Seventeen  laboratory  Intercomparison  studies  were   conducted.   Partici-
       pating laboratories  Included national. International,  private,  State and
       local government  laboratories.   An annual summary report on  the program
       was  Issued.

     - In  the repository  program,  300  radlonucllde standards  were distributed
       to Federal, State, and local laboratories.  The integrity of the standards
       is insured by a traceabillty program with the National Bureau of Standards.
       An annual report was prepared on laboratory  certification.

     - The  activities  of the Department  of  Energy  at  the  Nevada Test  Site and
       other nuclear  sites  were  supported with  an  extensive off-site monitoring
       program.
                                       R-10

-------
                                                       Explanation of Changes^ from January Budget Estimate
    -  Congressional Act
    was applied  to'  Sail
    appropriation  levels

    -  Transfer Author11
                                     January
                                    Estimate
                                    March
                                  Estimate
 Current
Estimate
    1s made" "tip  of a dec
    crease  of +$76,100 t

)82  Program

    In 1982, the Agency
irkyears  to this  progran
iproprlation and  $677,5
ivelopment  appropriation

    The objectives  of  i
slationshlps of  bioeffe
iposure and the  most  s<
le Interactions  of  radl
t) determine  the  relat!
i) determine the  influefl
• frequency modulation  c
id Improve  thermophysiol
') develop  and  test systj
! projects  supporting s
iterial,

    Since nonionlzing  r<
inverted  to heat,  effec
id testes must be inves
•owth and developmental]
 ing evaluated.  A  study
i moderate  levels of 245J
i male mice.    Research
i utero   to 2450  MHz wlf
tverses  as  the animals ijj

    Behavioral  and   neur
  Soviet and  East  Euro;
 ils "microwave  worker
 Ited States  researcher
 •ea, test  animals  are  e
  food and water  consu
 id performance on  learn
 anlnations of nervous
 project 1s underway  ti
 stology, especially in
 stnatal  life.

    Another area of  re:
 nionlzing radiation in
 raponents of  biological
 e capability  (1)  to  p
 entify and  direct nee
 perlments.  Subjects u
 on, frequency  specific
 stems, and effects on  1
  electrical  potential.;

    DosimetHc research!
 ques for  predicting
e ex'
              $108,300            $107,700           $107,700

     The net decrease of -5600 results from the following action:

     -  January - March.  (-$600)   This  change  represented a  decrease of  $600
     from the January  budget,  of  which  $300 was  for  Salaries  and  Expenses  and
     $300 was for  Research  and Development.   This  decrease resulted 1n a  small
     reduction in  the  radiation  quality  assurance  program  for  radlonuclide
     measurement in various  media.

1982 Program

     In 1982, the  Agency 1s allocating  a  total  of $107,700 and 2.0  permanent
workyears to this  program,  of  which $92,300  is  under  the  Salaries  and Expenses
appropriation and  $15,400   is  for  extramural  purposes  under  the  Research  and
Development appropriation.

    This program provides a quality assurance program  to document the  precision
and accuracy of  radiation  monitoring  for  surveillance of  existing  regulations.
This program has  a  national  scope  in providing expertise  to  Regional,  State,
local and  independent  laboratories.   Nine laboratory  studies  are  planned  for
completion in 1982.

     Other work includes  supporting the activities  of the  Department  of  Energy
at the  Nevada  Test  Site  and other nuclear test  sites with an  extensive  off-
site monitoring program,  and continuing  the  standards  and reference  materials
program, including the traceabiHty studies to the National  Bureau of Standards.

1983 Program Request

     The Agency requests a total  of $191,300 and 5.0 permanent workyears for this
program, of which  $174,600 1s for Salaries and Expenses and $16,700 is for Research
and Development.  This reflects  increases  of  $82,300,  and  $1,300,  respectively,
which results from a decision to  strengthen the radlochemlcal  quality  assurance
program.

     The laboratory  Intercomparison  studies  will  continue  with  approximately
200 Federal,  State,   university,   and  private  monitoring   laboratories  at  an
Increased level.   This  1s  an essential  part  of the  radioactivity monitoring
program with traceabllity provided to the National  Bureau of Standards.

     The off-site program of  the  Nevada Test  Site and other nuclear sites  will
be continued at the  request of the Department  of Energy. Testing is an Icipated
at the same or higher rate as 1982.

HEALTH EFFECTS
                      1981  Accomplishments

                           In 1981,  the Agency used a  total  of $2,085,100 for  this  program,  of which
                      $1,461,400 was  under  the   Salaries  and   Expenses  appropriation  and  $623.700
                      was for extramural purposes under the  Research  and  Development appropriation.

                           The function of the health  effects program 1s to  generate scientific  data
                      which support  the  Office  of  Radiation  Program's  efforts  to  produce Federal
                      Radiation Protection  Guidance  for Controlling  Public  Exposure  to  Radio Waves,
                      Including Microwaves.  Specifically,  the  program develops  information  on   the
                                                                                         R-ll

-------
jalth effects  and  actual
ide  range   of  non-ionizi
wironment.

    Examples of  the type
•ograra  1n  1981,  to  carry

    - Identified and  cha
     Ionizing radiation <
     leal  Investigations

    - Conducted  studies
     the  fluidity  of  11 pi
     model system.  No j
     functioning of biol
     actions at this  le
     research is imports
     proper functioning
     1s potentially higl
     the  membrane   level
     microwave  effects a

    - Evaluated  the 1nte
     temperature 1n mice
     sensitivity of the ,
     vating evaporative
     on ambient tempera!
     Interaction of NIR

    - Developed  a  comb1n<
     the  absorption of i
     logical  subjects.
     thermoregulatory sy
     energy and,  thus,
     scenarios  in  the en

    - Developed  lethality
     Lethality  data 1s
     contradictory and
     purpose  of this  pn
     co-factors on lethi
      support  of the  Gu
      relative importance
     exposure duration,
     went.  Consideratlc
      ditions  1s critica
      guidelines.

 82 Explanation  of  Changt

                January
                Estimate

               $2,973,IOC

    The net decrease  of

    -  January-March.
    $163,800 from  the  Ja
    Expenses and $54,000
    ted 1n the eliminate
    tlon health effects «
physiology computer model will be verified by taking temperature and other Impor-
tant thermal  physiological  measurements  in  primates exposed  to electromagnetic
fields.  Monkeys  have thermoregul atory   systems  similar  to  humans  and  can  be
used to  validate mathematical  predictive models.   Effort  is  being  devoted  to
developing or  improving  the  instrumentation  needed  to  characterize  both  the
external and  internal  electric and  magnetic fields associated  with nonlonizlng
radiation and to designing and constructing  the  unique  exposure  systems required
for  biological   research  at  specific  environmental   frequencies,  emphasizing
systems appropriate  for long-term  studies.   A  radio  frequency  exposure  system
will be established this year which 1s able to house and Irradiate approximately
200 rodents  at  500 MHz  (UHF-TV)  throughout  their llfespan.  This  facility  will
enable research  on chronic,  lifetime effects  and   survivorship  for  which  vir-
tually no  Information exists  to  date  although   such exposures  are  relevant  to
those experienced by the general public.

19J3^rogram Request

     The Agency  requests  a  total  of  $1,384,400 and  16.0 permanent  workyears
for this program,  of  which $1,163,500 1s for Salaries  and Expenses and $220,900
is for  Research  and  Development.   This  reflects decreases  of  $540,600  and
$456,600 respectively, which  is a  result of the completion  of  some  studies  in
1982 and an  attempt to produce data which  are  the most Immediately  useful  for
the Guidance.

     The primary  emphasis  will   shift  from  developing  dose-response data  1n
animals for  selected   specific  frequencies  to  a greater  focus  on establishing
information on biophysical  Interactions and  mechanisms  and  on developing models
to predict  and  Interpret  the  significance  of  non1on1z1ng  radiation  energy
deposition for humans.   The electromagnetic  radiation   spectrum  is conceptually
akin to a  complex  mixture of  chemicals since each" frequency  may pose different
potential risks.   In  fact,  the  importance  of  frequency dependence  is becoming
clearer through  current  research.   It is impossible to  investigate all frequen-
cies for all potential exposure environments.  Knowledge of mechanisms of inter-
action can  allow development  of models  and methods  to  predict  the potential
effects at  given frequencies  and exposure  levels  for   various  ambient environ-
ments.  Such a capability  can direct the development and  evaluation of environ-
mental exposure guidelines.

     Research which will directly support the Federal Radiation Exposure
Guidelines will Include the following activities:

     Model  biological  systems will be developed and  applied to predict the action
of nonlonizlng radiation  at  the molecular level.  The  absorption characteristics
of DMA and other selected molecules or cells will be examined via swept-frequency
microwave spectrometry  to identify  the  the frequencies  of  maximal  absorption
and, thus,  of greatest potential health concern.   Mechanism  research will continue
to focus on  critical  tissues and senstive physiological processes  such as brain
metabolism, calcium efflux,  and  membranes.   Energy absorption/thermal  response
computer models  and  techniques will  undergo further  refinements  to  extend  the
range of frequencies  covered,  to  focus on more  discrete localized  tissue areas,
and to enhance overall  efficiency.   These models will enhance the Agency's ability
to predict effects and energy absorption for specific frequencies.

     While the  scope  of  the animal  research  component of the program  will  be
reduced^ certain projects  will  be ongoing.  The  effects of 500  MHz  on survival
and cause  of death in rats  will   be  investigated  using  the  newly established
lifetime exposure chambers.  The continuous  exposure, mouse fertility  study will
be completed.  The Immunological responses and survival  of mice  with respiratory
disease will  be  compared in animals  stressed  with  either  microwaves  or various
ambient temperatures.   Investigation of the potential for persistence to maturity
of delayed  growth  and stunting in  newborn mice  exposed in utero will  continue.
Feto-toxicity will also be explored 1n hamsters  similarly  exposed to extend spe-
cies differentatlon  information  to  a   third  species.   Such  studies  provide
valuable information on sensitive biological  systems and susceptible populations.
                                                                                        R-14

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                                              RADIATIOH

                                                       Radiation Policy Council
                                                     ACTUAL
                                                       1981
                                               JANUARY
                                               ESTIMATE
                                                 1982
                                                           MARCH
                                                          ESTIMATE
                                                            1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
                PROGRAM
                                                               (DOLLARS  IN THOUSANDS)
so
I
Radiation Policy Council
 Salaries 8 Expenses
 Abatement Control  $
 Compl1ance
TOTAL:
 Salaries I Expenses

Radiation Policy        TOTAL
Council
                                                      $281.7
                                                     $281.7

                                                     $281.7
                                                $488.9
                                                $492.0
                                                $488.9

                                                $980.9
                PERMANENT FULL-TIME WORKYEARS


                Radiation Policy Council

                TOTAL PERMANENT HORKYEARS

                TOTAL HORKYEARS
                Radiation Policy Council

                TOTAL WORKYEARS
                                        1.9

                                        1.9




                                        4.3
                                                   9.0

                                                   9.0




                                                  12.0

                                                  12.0

-------
                                    RADIATION

                             Radiation Policy Council

Budget Request

     The Agency  Is  not   requesting  any  resources  for  this  activity  In  1983.

Program Oescrlption

     The Radiation Policy  Council  was  authorized  to  coordinate the  formulation
and Implementation  of Federal  policies  relating  to  radiation  protection.   In
addition, the Council  provided  liaison with the States  and Congress and  served
as a forum for public participation  and comment on Federal  radiation  protection
issues.  The Council  was  chaired  by  the Administrator of the  Environmental  Pro-
tection Agency  and  consisted  of representatives  at  the  Assistant  Secretary
level  or higher from  the thirteen member  agencies.  The  Council's  administrative
support, funds and staff were provided by EPA.

RADIATION POLICY COUNCIL

1981 -r__ Accompl 1 shments

     In 1981, the Agency obligated $281,700 for this program all of which  was in
the Salaries  and Expenses  appropriation.   The Radiation Policy Council  conducted a
review of occupation  exposure standards and  considered  a Federal  policy on  low-
level  radioactive waste disposal.   Additionally, the Council considered a  series
of actions and projects recommended by the Working  Group and special  task  forces.

1982 Explanation of Changes from January Budget Estimate

                       January         March         Current
                      Estimate       Estimate      Estimate

                      $980,900

     The net decrease of -$980,900 results from the following action:

                - March.   (-$980,900)   This  change  represented  a  decrease  of
     $98u,9UO from the  January budget,  of  which $488,900  was  for Salaries  and
     Expenses and  5492,000  was  for  Abatement,  Control  and  Compliance.   This
     decrease was due to  assumption  by member agencies  of  the  functions  of the
     Radiation Policy Council  1n 1982.

1982 Program

     In 1982, the  separate  functions of  the  Radiation Policy Council  are being
assumed by  member organizations.  The purposes  served by  the  Council  can  be
more effectively  carried out  by  existing  organizations including  the  various
agencies of  the  Executive  Office  of  the President,  Cabinet  Councils,  and  the
President's Council on  Regulatory  Relief.  Accordingly, the Agency  requested no
resources 1n 1982.

1 983 Program Request

     The Agency Is requesting no resources in 1983.
                                        R-16

-------
                                                              RADIATION

                                              Radiation Criteria, Standards & Guidelines
ACTUAL
 1981
JANUARY
ESTIMATE
  1982
         MARCH
        ESTIMATE
          1982
                                                                     CURRENT
                                                                     ESTIMATE
                                                                       1982
                                                                                               ESTIMATE INCREASE +
                                                                                                 1983   DECREASE -
                                                                                                       1983 VS 1982
                PROGRAM
                                                              (DOLLARS IM THOUSANDS)
TO
I
Environmental
Standards 4
Guidelines
 Salaries * Expenses
 Abatement Control 4
 Compl1 ance
                                                   $2,209.7   $3,359.4   $3,017.4   $2,515.9   $3,167.8    $651.9
                                                   $3,334.9   $3,425.4   $1,563.6   $1,044.7   $1,595.7    $551.0
                TOTAL:
                 Salaries & Expenses
                 Abatement Control 8
                 Compl1ance

                Radiation Criteria,     TOTAL
                Standards 8 Guidelines
                                   $2,209.7   $3,359.4   $3,017.4   $2,515.9   $3,167.8    $651.9
                                   $3,334.9   $3,425.4   $1,563.6   $1,044.7   $1,595.7    $551.0
                                   $5,544.6   $6,784.8   $4,581.0   $3,560.6   $4,763.5  $1,202.9
                PERMANENT FULL-TIME HORKYEARS
                Env1 ronmental
                Standards 4
                Guidelines
                                       44.6
66.0
              55.2
                                   53.2
55.2
2.0

-------
                                                              RADIATION

                                              Radiation Criteria, Standards * Guidelines

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE  +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE  -
                                                                 1982       1982       1982             1983  VS  1982

                                                              (DOLLARS IN THOUSANDS)
                TOTAL PERMANENT WORK YEARS
                                       44.6       66.0       55.2       53.2        55.2       2.0
TO


CO
                TOTAL HORKYEARS
Environmental
Standards &  -,
Guidelines
52.5
79.0       67.0       64.0       65.4
1.4
                TOTAL WORKYEARS
                                       52.5       79.0       67.0      64.0      65.4        1.4

-------
                                    RADIATION

                  Radiation Criteria, Standards, and Guidelines

Budget Request

     The Agency  requests  a  total   of $4,763,500  and 55.2  permanent  workyears
for 1983,  an Increase  of  $1,202,900 and  2.0  permanent  workyears  from  1982.
Included in  this  total  is  $3,167,800 for Salaries  and  Expenses and  $1,595,700
for Abatement, Control  and Compliance, with  increases  of $651,900 and $551,000
respectively.  The  increase  in positions  will  be  applied  to the development  of
standards for waste disposal.   The increase in salaries and  expenses  is  associated
with an, increase  in  salary costs.   The  Increase  in extramural  expenses  will
provide more contract support for regulatory analysis.

P rograin Descri pti on

    Radiation environmental standards and guidelines are  developed and promulgated
under this subactlvlty.   These standards and guidelines protect the  public  health
and the environment by minimizing risk of  radiation exposures from nuclear  energy
applications, naturally occurring radioactive materials,  medical  and occupational
radiation exposure and nonionizihg radiation.

ENVIRONMENTAL STANDARDS AND GUIDELINES

1981 Accomplishments

     In 1981, the  Agency obligated $5,544,600 for this program, of which  $2,209,700
was for the  Salaries and Expenses appropriation and $3,334,900  was  in  the  Abate-
ment, Control and  Compliance appropriation.  These funds were used for the develop-
ment of  standards  and  guidelines  for limiting  exposure  to  radiation.   Major
accomplishments for 1981 Included a  proposal  of standards addressing the disposal
of uranium mill tailings  from  Inactive  sites  and  Federal  guidance  on general
occupational exposure  to  ionizing   radiation.   Work continued  on   regulatory
actions for  high  level  and low level  radioactive  waste  disposal, management  of
mill tailings from  active  sites,  control  of airborne radlonuclides and limiting
exposure to nonionizing radiation.

1982 Explanation of Changes from January Budget Estimate


                      January          March         Current
                     Estimate         Estimate      Estimate

                    $6,784,800       $4,581,000    $3,560,600

     The net decrease  of -$3,224,200  results  from  several actions, as  follows:

     "  January -March,   (-$2,203,800)  This   change represented a decrease  of
     $2,203,800 from the January budget,  of which  $342,000 was  for Salaries and
     Expenses and $1,861,800  was for Abatement, Control  and Compliance.   This
     decrease reflected a decision to defer  development of  standards for airborne
     release of radlonuclides during 1982.

     -  CongressionalActions.   (-$1,020,400)    A  reduction  of  -$350,100  was
     taken agalnt the March  estimate  reflecting the  September 12% reduction  to
     the Abatement,  Control  and Compliance appropriation.   The reduction  will
     result In the elimination of pre-regulatory studies  for  revising the uranium
     miner occupational   exposure guidance.    Additionally,  1t  will   result  in
     reduced contract support  for non-ionizing radiation standards  and standards
     for low-level waste disposal.
                                        R-19

-------
     An additional   reduction  of  -$670,300 was  applied to  the  Salaries  and  Ex-
     penses ($501,500) and Abatement,  Control  and Compliance  ($168,800)  appropri-
     ations to meet Congressionally mandated appropriation  levels.

1982 Program

     In 1982, the  Agency is  allocating  a total  of  $3,560,600 and  53.2  permanent
Morkyears to this  program,  of which $2,515,900  is for  Salaries  and Expenses  and
$1,044,700 is for  extramural  purposes  under the Abatement, Control  and  Compliance
appropriation.  The 1982  program  efforts  are  focused  on  three  regulatory  areas:
radioactive waste disposal, Federal Guidance, and control of  airborne radionuclides
under the Clean Air Act.   Planned  radioactive  waste  activities include  the promul-
gation of standards for  the  disposal  of uranium mill tailings  from  inactive sites
as well  as  proposal  of  disposal  standards  for  high  level  radioactive  wastes,
and for  uranium  mill  tailings  from  active  sites.   Also planned  for 1982  is  the
publishing of criteria  for  the ocean  disposal  of  special  classes  of low level
waste in anticipation of permit requests  from  the Department  of  Energy  (DOE)  and
the Department of Defense (DOD).

     During 1982,  work  will   continue  on  low level  waste  standards  and  standards
for the  control  of   airborne radionuclides.   Federal   Guidance  activities  under
development include final  guides  for  general   occupational  exposure and  proposed
guidance to limit  exposure to nonionizing radiation  in the radio  frequency  range.

1983 Programi Request

     The Agency  requests  a total   of  $4,763,500 and  55.2  permanent  workyears  for
this program, of  which  $3,167,800 is  for  the  Salaries  and   Expenses  appropria-
tion and SI,595,700 1s  for  the Abatement,  Control  and Compliance  appropriation.
The 1983  program  efforts  will continue   to  emphasize  management of  radioactive
waste, development  of  Federal  radiation  guidance  and the  control  of  airborne
radionuclides under the  Clean Air  Act.   Planned  radioactive  waste  activities
include promulgation  of  standards for  the  disposal  of  high level  radioactive
waste, the  promulgation  of standards  for the management  of  active  mill  tailings
sites and the proposal  of standards  for low level waste disposal.   Also  completed
in 1983 will be the preparatory technical  work  necessary to  respond to  anticipated
DOE and DOD ocean disposal permit requests.

     Federal guidance  activities for 1983  will  Include  the completion  of  guidance
for general  occupational  exposure.    Protective  action  guides  (PAG's)  will  be
proposed for airborne and  food pathways exposure  resulting from accidental  release
of radioactive  materials.   Federal  Guidance   limiting exposure  to  nonioninzing
radiation in the radio frequency range  will also be proposed.
                                        R-20

-------
                                                               RADIATION

                                                    Radiation Program Implementation

                                                      ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE  +
                                                       1981      ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE  -
                                                                  1982       1982       1982            1983  VS  1982
                 PROGRAM
                                                               (DOLLARS IN THOUSANDS)
TO
I
FO
                 Radiation Program
                 Implementation
                  Salaries & Expenses
                 TOTAL:
                  Salaries S Expenses

                 Radiation Program
                 Implementation
TOTAL
$601.4     $596.3     $596.3     $580.0     $628.6     $48.6




$601.4     $596.3     $596.3     $580.0     $628.6     $48.6

$601.4     $596.3     $596.3     $580.0     $628.6     $48.6
                 PERMANENT FULL-TIME WORKYEARS
                 Radiation Program
                 Implementation

                 TOTAL PERMANENT HORKYEARS
                13.4
                13.4
             14.8
             14.8
14.8
14.8
13.9
13.9
10.0
10.0
-3.9
-3.9
                 TOTAL HOWCYEARS
                 Radiation Program
                 Implementation
                15.3
             16.6
16.6
15.6
11.1      -4.5
                 TOTAL WORKYEARS
                15.3
             16.6
16.6
15.6
11.1      -4.5

-------
                                  RADIATION

                       Radiation Program Implementation

Budget Request

    The Agency  requests  a  total  of $628,600  and 10.0  permanent workyears  for
1983, an  Increase of  548,600  and  a decrease  of 3.9  permanent workyears  from
1982.  The full  request  1s  within the Salaries and Expenses  appropriation.   The
reduction of 3.9  permanent  workyears from the 1982  level  represents a  reduced
need to  review and  test radiation  emergency  response  plans.   The  Increase  in
dollars provides for full support to all. workyears within this  program  element.

ProgramDescription

     This subactlvlty  supports  activities of  EPA's  Regional  offices Including:
reviewing routine  environmental   Impact   statements   (e.g.,  Ughtwater  reactors
and uranium mining and milling); providing the public  with technical  Information;
providing direct assistance  to State and local  governments with  special  radiation
problems of  a  short-term nature;  participation In  the reviewing and testing  of
State radiological emergency response plans; and providing the radiological exper-
tise needed  by  the Regions  to  manage  radiological  problems associated  with the
drinking water and hazardous waste programs.

RADIATION PROGRAM IMPLEMENTATION
1981Accompl1shments

     In 1981, the Agency obligated $601,400 for this program, all  of which was in
the Salaries and Expenses appropriation.  The major emphasis for the 1981 Regional
program 1s technical assistance to States 1n the area of emergency response plann-
ing.  EPA assists  States  1n the  development  of radiological emergency  response
plans and formally reviews  these plans  along with other Federal  agencies under the
coordination of Federal  Emergency Management Administration (FEMA).  In addition,
the 1981 Regional programs  continued  to provide EIS's review, technical assistance
to the States and technical support to other EPA Regional  programs.

1982Explanation of Changes from JanuaryBudget Estimate


                     January           March          Current
                    Estimate          Estimate       Estimate

                    $556,300          $596,300       $580,000

     The net  decrease   of  -$16,300  results from  several  actions,  as  follows:

     "  ^programming.   (+$18,300)  During the development of the operating plan,
     several mi seel laneou s reprogramnri ngs, which are  not  reportable to Congress,
     were made  to  this  activity  and  resulted  in  a net  increase of  +$18,300.

     -  Congressional Actions.  {-$35,300)  An  additional reduction  of -$35,300
     was applied  to the Salaries and  Expenses appropriation  to  meet  Congres-
     sional ly mandated appropriation levels.

     -  Transfer Authorjty.  (+$700)   The  net increase applied to this activity
     Includes anincrease of +$700 to Salaries and Expenses for necessary operat-
     ing expenses.
                                        R-22

-------
1982Program

     In 1982, the  Agency is  allocating  a total  of $580,000  and  13.9 permanent
workyears to this  program,  all  of which  is  for Salaries and  Expenses.   In  1982
emphasis remains on  radiological  emergency  response  plans.  However, with  more
plans completed and  approved, the testing  of these  plans  will receive  greater
attention.  Other activities in 198Z  will Include the review of EIS's, assistance
to the drinking water  and hazardous waste  program, and technical  assistance to
States.

1983 Program Request

     The Agency requests  a total  of  $628,600 and  10.0 permanent  workyears for
this program,  all  of  which  1s  for Salaries  and  Expenses.   EPA  participation
in the review and testing of  emergency response  plans  will  continue at a reduced
level.  EIS review and technical assistance to States  will  also  be a significant
element of  regional  program activities.   Also  receiving prominence will  be the
provision of technical  assistance to  other EPA regional programs such as drinking
water, and hazardous waste.
                                        R-23

-------
                                              RADIATION

                              Radiation Environmental Impact Assessment
                                     ACTUAL
                                      1981
                       JANUARY
                       ESTIMATE
                         1982
                        MARCH
                       ESTIMATE
                         1982
CURRENT
ESTIMATE
  1982
ESTIMATE INCREASE +
  1983   DECREASE -
        1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Radiation Assessment
 Salaries 4 Expenses
 Abatement Control 5
 Compl1ance

Monitoring 8 Analysis
 Salaries & Expenses
 Abatement Control &
 Compl1ance

Technology Assessment
 Salaries 8 Expenses
 Abatement Control 4
 Conpl1ance
           $3,925.1
           $1,499.2
                      $4,246.2
                        $794.8
                        $387.6
                         $25.0
                      $3,968.8   $3,342.9   $2,772.6   -$570.3
                        $759.3     $350.0     $600.0    $2SO.O
TOTAL:
 Salaries 6 Expenses
 Abatement Control  §
 Compliance

Radiation
Environmental Impact
TOTAL
           $3,925.1   $4,633.8   $3,968.8   $3,342.9   $2,772.6   -$570.3
           $1,499.2     $819.8     $759.3     $350.0     $600.0    $250.0
$5,424.3   $5,453.6   $4,728.1   $3,692.9   $3,372.6   -$320.3

-------
                                              RADIATION
                              Radiation Environmental  Impact Assessment
                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                      1981     ESTIMATE   ESTIMATE    ESTIMATE     1983    DECREASE -
                                                 1982        1982       19B2            1983 ₯S 1982
PERMANENT FULL-TIME MORKYEARS

Radiation Assessment                   92.9                  62.0       60.0       48.9     -11.1
Monitoring A Analysis                             75.0
Technology Assessment                             10.0

TOTAL PERMANENT WORKYEARS              92.9       85.0       62.0       60.0       48.9     -11.1

TOTAL HORKYEARS
Radiation Assessment                  106.0                  74.0        71.0       58.0     -13.0
Monitoring S Analysis                             86.0
Technology Assessment                             11.0

TOTAL WORK YEARS                       106.0       97.0       74.0       71.0       58.0     -13.0

-------
                                   RADIATION

                  Radiation Environmental  Impact Assessment

Budget Request

     The Agency requests a  total  of $3,372,600 and 48.9 permanent  workyears  for
1983, a decrease  of  $320,300 and 11.1  permanent  workyears from 1982.   Included
in this total is $2,772,600 for Salaries and Expenses a decrease of  $570,300;  and
$600,000 for Abatement, Control and Compliance, an increase of  $250,000,  respec-
tively.  The decrease  in Salaries  and Expenses  reflects  the  consolidation  of
Agency EIS  review  in  the  Interdisciplinary program.   The  increase  in  Abatement,
Control, and Compliance resources will provide more contract support for environ-
mental sampling associated with regulatory development.

Program Description

     Activities in this  area provide the  information  necessary to  identify  and
analyze potential   radiological  health problems having public health impact,  and
to support the development  of standards and  guidelines.   Also  encompassed  under
this subactivity is the monitoring  of environmental  radiation,  as  well  as  labo-
ratory analysis, technology  assessments,   emergency  preparedness,   and  emergency
response.

RADIATIONASSESSMENT

1981 Accomplishments

     In 1981, the Agency obligated $5,424,300 for this program, of which  S3,925,100
was in the Salaries and Expenses appropriation and  $1,499,200 was in the  Abatement,
Control and  Compliance  appropriation.  Resources  in this element  were  used  to
provide laboratory and technical support to radiation standards  setting activities;
the review of major EIS's;  the maintenance of an emergency response capability;
assistance to the Regions  In review  and testing of State emergency response plans;
laboratory assistance and  support to  other  EPA offices; and analytical  support
to State radiological  programs.  Also supported was the continued operation of  the
Environmental Radiation Ambient Monitoring  Systems (ERAMS), and  operation of  the
radium collection  and repository  program.   During 1981, particular  emphasis  was
placed on the analysis of radlonuclide emissions from coal-fired  power plants,  the
design and Initiation of the Butte,  Montana,  radon survey and the strengthening of
our emergency response capability through  the design  and acquisition of a special
mobile laboratory.   Another  special activity  in 1981  was an extensive  ground  and
aerial gamma survey  of portions  of  the western  states which  had  a  history  of
uranium resource extraction.   A program-wide quality assurance plan was  completed.

1982 Explanation of Changes from January Budget Estimate


                     January      .   March            Current
                    Estimate        Estimate         Estimate

                                   $4,728,100       $3,692,900

     The net Increase of  +$3,692,900  results from several actions, as  follows:

     "  Restructuring.  (+$4,728,100)  These resources were moved from the  moni-
     toring and analysis program  to radiation assessment  program to consolidate
     two related program  elements Into one  program  function.  This new program
     element will  encompass  activities  and outputs related to the Identification
     and analysis  of  potential  standards  and  guidelines,  assessment   of radio-
     logical quality  of the environment.   Assistance to other  Federal  and  State
     agencies will   be provided to  Investigate,  analyze and evaluate  radiation
     problems.
                                        R-26

-------
     -  CqngresslP"a] Actjons.   (-$1,035,200)   A  reduction  of  -$170,100  was
     taken against the March  request reflecting the  September 12%  reduction  to
     the Abatement,  Control  and  Compliance appropriation.   The reduction  Mill
     reduce contract support  with  the States for  the operation of  the  environ-
     mental radiation  ambient monitoring   system  (ERAMS)  monitoring  stations.

          An additional reduction  of -$865,100 was  applied to the  Salaries  and
     Expenses ($853,900)   and  Abatement,  Control  and  Compliance  ($11,200)  appro-
     priations to meet Congressionally mandated  appropriation levels.

     -  Transfer Authority.  (No Change)   The net change applied to this  activity
     1s made up  of  a decrease of -$228,000 to Abatement, Control  and Compliance
     and an Increase of +$228,000  to Salaries and Expenses.   This  transfer will
     provide equipment for Three  Mile  Island monitoring   and  the  Montgomery,
     Alabama Laboratory.   This transfer will  restore  funds  to purchase equipment
     previously planned for.

1982 Program

     In 1982, the  agency  1s  allocating  a total  of $3,692,900 and  60.0 permanent
work years to this program, of which $3,342,900 1s for Salaries and Expenses  and
$350,000 1s  for extramural  purposes under  Abatement,  Control  and  Compliance.
Laboratory support  of  standards  setting will  continue along  with  activities  1n
emergency response,  emergency  preparedness,  ERAMS,   quality  assurance,  and  the
radium repository.   Changes  that occur in  the  1982  program  Include  the discon-
tinuation of Indoor  radon  studies  with the  exception  of the Butte, Montana, pro-
ject; the elimination  of  the public  Information program, and the  discontinuance
of the  surveillance  of areas where uranium extraction  industries  have operated.
Additional emphasis  will   be  placed  on  emergency  response  monitoring  as  this
program element  takes  over the responsibility for long-term,  off site monitoring
at Three Mile Island (TMI).

1983	Plan

     The Agency  requests  a total  of  $3,372,600 and 48.9  permanent workyears  for
this program, of which $2,772,600  1s  for  Salaries and Expenses appropriation  and
3600,000 is  for the Abatement,  Control  and Compliance  appropriation.   The 1983
program will  provide laboratory  and analytical  support to the development  of
standards under  the  Clean  Air Act and for the management of radioactive wastes.
A fully equipped emergency response capability will be maintained.   The  off-site
monitoring of  the  clean-up  activities  at  TMI   nuclear reactor  site  will   be
continued.  The  Environmental  Radiation  Ambient Monitoring System  will  collect
and analyze air, precipitation, and milk  radiation levels.  The Quality Assurance
Program will be  operated  to  ensure accuracy of results  from laboratory  analysis
and for  data  analysis conducted through contracts  supported  by  EPA  radiation
program.  Field  collection  of radon measurements  1n  the Butte, Montana,  survey
will be  completed.  Support  1n the  form of  radiochemical  analyses,  technical
assistance, and  the occasional  loan of  equipment to  the   States  and  to  other
Federal agencies,  will continue at  a  reduced level.   The  radium  repository  at
the Montgomery, Alabama,  field facility will  collect  and store an  additional  100
radium shipments.   This  is  the  only mechanism  available  to State  and Federal
government for the management of this otherwise uncontrolled hazardous substance.
                                        R-27

-------
Page Intentionally Blank

-------
Noise
 SECTION TAB

-------
Page Intentionally Blank

-------
a
I
                                                      ACTUAL
                                                       1981
                                                                  NOISE
                                              JANUARY
                                              ESTIMATE
                                                1982
                         MARCH     CURRENT   ESTIMATE INCREASE +
                        ESTIMATE   ESTIMATE    1983   DECREASE -
                          1982       1982            1983 VS 1982
                  APPROPRIATION
 Salaries 4 Expenses
 Abatement Control 8
 Compliance

TOTAL, Noise

PERMANENT FULL-TIME WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
                                                               (DOLLARS IN THOUSANDS)
                                                    $4,672.5   $5.279.4   $1,906.0   $1,802.1
                                                    $7,534.6   $7,479.9     $365.4     $208.5
                                                   $12,207.1  $12,759.3   $2,271.4   $2,010.6
     89.3
    128.3
$13,210.2
     93.5
    142.9
$13,356.0
     29.2
     42.9
$12,060.0
    25.2
    37.7
$2,189.4
                                                                                                 $350.0
                                                       -$1,802.1
                                                         -$208.5
-$2,010.6

    -25.2
    -37.7
-$1,839.4
                  Environmental Noise
                  Strategies * Standards
                   Salaries A Expenses
                   Abatement Control $
                   Compliance

                  Noise Program
                  Strategies ft Implementation
                   Salaries 4 Expenses
                   Abatement Control 4
                   Compliance
                                  $1,966.4   $2,119.5   $1,906.0   $1,802.1
                                  $3,710.7   $3,711.5     $365.4     $208.5
                                  $1,755.0
                                  $3,720.2
            $2,058.9
            $3,542.6
                                                       -$1,802.1
                                                         -$208.5

-------
                                             NOISE
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
                                             (DOLLARS IN THOUSANDS)
 Salaries ft Expenses
 Abatement Control ft
 Compliance
ABATEMENT ft CONTROL

Noise Enforcement
 Salaries ft Expenses
 Abatement Control ft
 Compliance

 Salaries 8 Expenses
 Abatement Control ft
 Compllance
ENFORCEMENT

TOTAL PERMANENT WORKYEARS
        $3,721.4   $4,178.4   $1,906.0   $1,802.1
        $7,430.9   $7,254.1     $365.4     $208.5

TOTAL  $11,152.3  $11,432.5   $2.271.4   $2,010.6
          $951.1   $1,101.0
          $103.7     $225.8
          $951.1   $1.101.0
          $103.7     $225.8

TOTAL   $1.054.8   $1.326.8
                                                  -$1,802.1
                                                    -$208.5

                                                  -$2,010.6
Environmental Noise
Strategies ft Standards

Noise Program
Strategies 4 Implementation
ABATEMENT ft CONTROL       TOTAL
Noise Enforcement
ENFORCEMENT
TOTAL
35.6


34.3

69.9

19=4
19.4
34.7


39.6

74.3

19.2
19.2
                                  29.2
                                  29.2
25.2
25.2
-25.2
-25.2

-------
                                                                       NOISE
f
U)

TOTAL WORKYEARS
Environmental Noise
Strategies 4 Standards
Noise Program
Strategies A Implementation
ABATEMENT 4 CONTROL TOTAL
Noise Enforcement
ENFORCEMENT TOTAL
ACTUAL
1981

47.6
52.2
99.8
28.5
28.5
JANUARY
ESTIMATE
1982

50.0
57.6
107.6
35. 3
35.3
MARCH
ESTIMATE
1982

42.9
42.9
CURRENT
ESTIMATE
1982

37.7
37.7
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982

-37.7
-37.7

-------
                                     NOISE


OVERVIEW AND STRATE6Y

     The 1982  noise  control  budget  represented  a  major  policy   change  with
respect to the  Federal  effort to  reduce  noise exposure.   As  reflected 1n  that
budget request, the EPA noise  control  program 1s being phased-out by the  end  of
1982.  This  decision  results  from a  determination that  the benefits  of noise
control are  highly  localized  and  that  the  function  of  noise  control  can  be
adequately carried out at the State  and local level  without the presence of  a
Federal program.

     States and localities  have  shown  a  significant Increase  In their  ability
and desire to develop their  own  noise  control programs.   During the  last  decade,
over 1300 municipalities  and 24 States  have enacted  noise  control  legislation.
Of these, 20 States  have  viable  active programs and  over 300 local  communities
have ongoing  noise  control  programs  with  active enforcement.   This dramatic
growth (233% 1n the  past five years)  convincingly demonstrates  that State and
local governments  can  and  will  deal  with  environmental   noise problems  within
their jurisdictions.

     The major components of EPA's  existing  noise control  effort are  promulgation
and enforcement of Federal  noise regulatlonsj strengthening the  capabilities  of
State and  local   noise  control  agencies  by  providing  technical  and  financial
assistance, and the  conduct of noise health  effects research.

     For both 1981 and T982, activities were structured to  achieve  a prompt but
orderly phase-out of current program activities  by transferring to the  State and
local programs knowledge  and experience EPA has gained.  EPA will also transfer
noise measurement  equipment  that   will   aid  States  and  local  governments  to
assume additional  responsibility.

     Since the  final phase-out of the Noise  Control  Program Is to  be  completed
by the end  of 1982,  no resources  are  being requested for this program In 1983.
                                        N-4

-------
                                   NOISE


SUMMARY OF INCREASES AND DECREASES
                                                        (In thousands of dollars)
     1982  Noise Program...	             $2,010.6

        Salaries and Expenses	             -1,802.1

        The net decrease reflects the  personnel  reduc-
        tions associated  with  the  phase-out  of  this
        program by the end of 1982.

        Abatement, Control  and Compliance.	               -208.5

        The net decrease reflects the phase-out of this
        program by the end of 1982.

     1983 Noise Program		,	                  $0


SUMMARYOFCHANGESTOJANUARY 1982 BUDGET ESTIMATE

                                                        (in thousands of dollars)

     January 1982 Estimate..	            $12,759.3

        Janua ry-Ma rch	            -10,487.9

        Congressional Actions	               -260.8

        A decrease  of  $81,900  to  Abatement,  Control
        and Compliance  was  taken  against  the  March
        estimate to  reflect the  September 12%  reduc-
        tion.  An additional reduction of $178,900 was
        applied to the Salaries and  Expenses ($103,900)
        and Abatement, Control  and Compliance ($75,000)
        appropriations to meet Congressionally mandated
        appropriation levels.

     Current 1982 Estimate	             $2,010.6
                                        N-5

-------
Page Intentionally Blank

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                                  NOISE
                              Environmental Noise Strategies & Standards
                                     ACTUAL
                                      1981
                       JANUARY
                       ESTIMATE
                         1982
                        MARCH
                       ESTIMATE
                         1982
CURRENT
ESTIMATE
  19,82
ESTIMATE INCREASE +
  1983   DECREASE -
        1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Noise Standards
Development
 Salaries 4 Expenses
 Abatement Control 4
 Compliance

Noise Control
Technology Assessment
& Criteria Development
 Salaries * Expenses
 Abatement Control &
 Compliance
             $939.6     $954.8     $954.8     $571.9
           $1,455.2   $1,440.0                $130.2
           $1,026.8   $1,164.7     $951.2   $1,230.2
           $2,255.5   $2,271.5     $365.4      $78.3
                                                       -$571.9
                                                       -$130.2
                                                     -$1,230.2
                                                        -$78.3
TOTAL:
 Salaries & Expenses
 Abatement Control 4
 Compliance

Environmental Noise
Strategies * Standards
TOTAL
           $1,966.4   $2,119.5   $1,906.0   $1,802.1
           $3,710.7   $3,711.5     $365.4     $208.5
$5,677.1   $5,831.0   $2,271.4   $2,010.6
                                                     -$1,802.1
                                                       -$208.5
                   -$2,010.6

-------
                                                NOISE

                              Environmental  Noise Strategies £ Standards

                                     ACTUAL     JANUARY     HARCH      CURRENT    ESTIMATE  INCREASE +
                                      1981     ESTIMATE   ESTIMATE    ESTIMATE     1983    DECREASE -
                                                 1982       1982        1982            1983 VS  1982
PERMANENT FULL-TItC WORKYEARS
Noise Standards
Devel opinent
Noise Control
Technology Assessment
& Criteria Development
TOTAL PERMANENT HQRKYEARS
TOTAL WORK YEARS
Noise Standards
Development
Noise Control

16.9 13.8 13.8 10.0 -10.0
18.7 20.9 15.4 15.2 -15.2
35.6 34.7 29.2 25.2 -25.2

21.2 19.6 19.6 11.8 -11.8
26.4 30.4 23.3 25.9 -25.9
Technology Assessment
& Criteria Development

TOTAL HORKYEARS                        47.6       50.0       42.9        37.7                 -37.7

-------
                                      NOISE

                   Environmental Noise Strategies and Standards

Budget Request

     Consistent with the Agency's decision to phase-out the noise control  program
1n 1982, no resources are requested for 1983.

Program Description

     This program focuses  on  the  development and  promulgation  of emission  and
labeling regulations that will  reduce harmful  noise emissions  from new products.
The Agency develops these regulations through the gathering  and  analysis  of data
on noise and Its health effects to determine exposure and levels of noise reduction
required for health  and  welfare protection and for specific regulatory actions.
Evaluations of private and  public  sector technology development  are performed to
determine best available  technology,  and assessments  of  economic, environmental
and health data are made to ascertain the costs and benefits of regulation.   This
program also Includes conduct of a noise health and welfare effects Investigation
program.

     Noise Standards Development — The objective  of  noise product  regulation
1s to  regulate products  which  are major  contributors  to environmental  noise
exposure,

     Under Section 6 and 3 of the Noise Control Act, the Environmental  Protection
Agency develops and promulgates regulations to control  noise from products  which
are major  noise  sources  through  the  use  of  noise emission  limitations  and/or
noise labeling requirements for newly manufactured products.  The analysis leading
to and  supporting  these  regulations  Includes  the  preliminary  investigation  of
potential products for regulation, economic and technological feasibility and the
evaluation of  health,  welfare, and other benefits  derived  from  specific  product
regulations.  Other  activities  Include the  preparation  of  necessary  background
and supporting material, such  as  EIS's and economic assessments, for the promul-
gation of standards.
     Noise ,l^ntjyl_ JwJ!nj^8y_ .ftgs.esp^_nt and Criteria Development —  The  objec-
tlve of tnfs actfviW  ts  toT provide support to CM  for  noise product regulation
and State  and  local  control  efforts through Investigations  and  documentation of
noise health effects and availability of noise control technology.

     Specific activities include the development of  health and welfare criteria,
for the assessment  of  general  exposure to noise; the  assessment of the environ-
mental, economic, social and  health Impacts of noise  abatement  options;  and the
assessment of advanced and/or future noise control  technology including coordina-
tion and  evaluation of noise research and  control   conducted by  other  Federal
agencies.

NOISE STANDARDS DEVELOPMENT

1981 Accomplishments

     In 1981, the Agency obligated $2,394,800 for this program, of which $939,600
was for Salaries and Expenses and $1,455,200 for Abatement. Control, and Compliance.
These funds  were used  for those activities  that were necessary to Initiate the
orderly phase-out  of  the  noise  regulatory  program.   Accomplishments  included
promulgation of  noise  emission standards for  motorcycles  and motorcycle exhaust
systems and  a  technical  amendment was  proposed to  that  regulation  that  would
strengthen the  compliance  testing  procedure.  The Agency  deferred  the effective
date of the truck regulation  for one year from 1982  to 1983.  The enforcement of
the garbage truck regulation was suspended.
                                        N-8

-------
1982 Explanation of Changes from January Budget Estimate

                January            March           Current
                Estimate           Estimate        Estimate

               $2,394,800          $954,800        $702,100

     The net decrease  of -$1,692,700 results  from several actions, as  follows:

     "  January " March-   (-$1,440,000)  This  change represented a decrease  of
     $i,44u,uuu from the January budget, all  of which was from Abatement, Control
     and Compliance.  This  reduction reflected the  decision  to  discontinue  the
     noise program at the end of 1982.

     "  RePfograimn'ng.   (-$140,900)  This  reprogranmrlng of -$340,000 represents
     a redistribution of expenses and the  transfer of personnel  compensation  and
     benefits and workyears  to support  the  noise control  technology  assessment
     and criteria  development  program  In  1982  as  the  noise program  phase-out
     continues.  The  higher salary  cost  per  workyear  results  from  personnel
     losses at lower grade levels.  The other expense transfers establish office-
     wide support controlled 1n  this program.   (This reprogramnring  was Included
     In a letter to Congress on December 16,  1981).

        Additionally, during the development   of  the  operating  plan,  several
     miscellaneous reprogramnrfngs,  which  are  not  reportable  to Congress, were
     made to this activity and  resulted 1n  a  net Increase of +$200,000.

     -  CongressionalActions.    (-$99,800)   A  reduction  of  -$44,800 was  taken
     againstthe Marchestimate  reflecting  the September  12* reduction to  the
     Abatement, Control  and  Compliance appropriation resulting  in  the  elimina-
     tion of the  completion  of a post  regulatory analyses on medium/heavy duty
     trucks.

        An additional  reduction   of  -$67,000  was  applied  to the  Salaries  and
     Expenses ($42,000)  and  Abatement,  Control  and  Compliance  ($25,000)  appro-
     priations to meet Congressionally mandated appropriation  levels.

1982 Program

     In 1982,  the  Agency 1s allocating a  total of  $702,100   and 10.0  permanent
workyears for this  program,  of which $571,900  1s  for Salaries  and  Expenses  and
$130,200 1s for extramural  purposes under  the Abatement,  Control  and  Compliance
appropriation.

     The 1982 activities focus on completion  of all regulatory phase-out actions.
Including taking all the necessary  legal  steps to effect  the  steps  to terminate
all mandated  regulation  development activities.  The documentation  and transfer
of regulatory Information  to States and localities  will  be completed  for  their
use, as appropriate, in their regulatory program development activities.

1983 Program Request

     Consistent with the Agency's decision  to phase-out the noise control program
In 1982, no resources are requested for 1983.

MOISE COHTROL TECHNOLOGY ASSESSMENT AMD CRITERIA DEVELOPMENT

1981AccomplIshments

     In 1981, the Agency obligated $3,282,300 for this program, of which $1,026,800
was for Salaries  and Expenses  and  $2,255,500  for Abatement,  Control,  and Com-
pliance.  These funds  were used  for Initiation of phase-out efforts In the areas
of health effects research  studies,  technology demonstrations,  and noise abatement
strategies-
                                       N-9

-------
     The 1931  accomplishments  included  an  annual  report on  the University  of
Miami primate "study  (the  initial  findings of increased blood  pressure  attribut-
able to noise were again  replicated).  In addition, the Agency  finalized  reports
on the  epidenrtological  feasibility  study  and psychoacoustic  study  of  engine
brake noise. The prospective epidemiologlcal  feasibility study sets forth specific
recommendations for future epidemlological  studies.  The results from the psycho-
acoustic study of  engine  brake  noise supports the  regulation  of this  source of
noise.

     During 1981, EPA completed the Quiet Engine and Quiet  Tire research  projects.
In addition, the Agency cancelled the Quiet House program  and eliminated  part of
the Quiet Truck program.   A significant accomplishment in the  Quiet Truck Program
was the quieting  of  the  third  (of four) heavy duty  trucks  to approximately  72
dBA. The construction site demonstration and a cooling  system  technology assess-
ment were  completed:   The remaining three  Inter agency agreement  demonstrations
were completed:   Shipyard  Machinery  Noise  (Mavy),  Electric  Generating  Plant
(TVA), and Quiet Propeller (NASA).

1982_ Explanation of Changes from January  Budget Estimate

                January            March            Current
               Estimate          Estimate          Estimate

             $3,436,200        $1,316,600       $1,308,500

     The net decrease  of  -$2,127,700 results  from  several actions, as  follows:

     -  January - March.  (-$2,119,600)  This  change  represented a decrease  of
     $2,119,6*00 fromthe  January  budget,  of  which  $213,500   was for  Salaries
     and Expenses  and  $1,906,100  was  for  Abatement,  Control  and  Compliance.
     These reductions reflected  the  decision to  41 continue the noise program by
     the end of 1982.

     "  Deprogramming.  (+$140,900)  This  reprogramming  of +$340,900  represents
     a redistribution  of  expenses  and  the  transfer  of  personnel  compensation
     and benefits and workyears  to support the noise control  technology  assess-
     ment and criteria development program in 1982 as  the  noise program  phase-out
     continues.  The  higher salary  cost  per workyear  results  from  personnel
     losses at  lower  grade  levels.   The  other  expense  transfers  establish
     office-wide support  controlled  in  this program.  (This   reprogramming  was
     included in a letter  to Congress  on  December  16,  1981).

        Additionally, during  the  development  of  the  operating  plan,  several
     miscellaneous reprogrammings, which  are  not reportable  to  Congress,  were
     made to this activity and resulted in a net  decrease  of  -$200,000.

     -  Conaressional Actions.    (-$149,000)   A reduction   of -$37,100 was  taken
     against the March  estimate  reflecting  the  September 12*  reduction  to  the
     Abatement, Control and  Compliance appropriation.  This  action will  result
     In the  elimination  of  aviation  modelling which  provides documentation  of
     a two-year aviation study.

        An additional  reduction  of  -$111,900  was  applied to  the Salaries  and
     Expenses ($61,900) and  Abatement,  Control and Compliance ($50,000)  appro-
     priations to meet Congressionally mandated appropriation levels.

1982 Program

     In 1982, the Agency  is allocating  a total of  $1,308,500  and 15.2  permanent
workyears for this program, of which $1,230,200 is  for Salaries and Expenses and
$78,300 1s  for extramural purposes under  the  Abatement,  Control  and  Compliance
appropriation.
                                        N-10

-------
     During 1982, the program 1s concentrating on the completion of all  remaining
phase out activities begun 1n 1981.  This Includes the completion and dissemination
of the  final  reports for 21  research projects.   The results  of  these  projects
are to  be made  available  not  only  to  the  scientific  community,  but  also  to
other Federal, State,  and  local governments  for Incorporation into their  noise
control  efforts.

     All technology  research projects  are  also  being  brought  to  completion.
Reports and/or summary  information are  to  be prepared for  transfer and use  by
States and localities.   The  results  of  interagency demonstrations  to  determine
techniques and technologies  for  abating noise are also to be packaged for  transfer
to all Interested parties,  Including Federal and State agencies.

1983 Program Request

     Consistent with the Agency's decision to phase-out the noise control program
in 1982, no resources are requested for 1983.
                                        N-ll

-------
                                                NOISE
                              Noise Program Strategies * Implementation
                                     ACTUAL
                                      1981
                       JANUARY
                       ESTIMATE
                         1982
                        MARCH
                       ESTIMATE
                         1982
CURRENT
ESTIMATE
  1982
ESTIMATE INCREASE +
  1983   DECREASE -
        1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Noise Control
Implementation £
Evaluation
 Salaries * Expenses
  Abatement Control 4
  Compliance

Federal Agency
Coordination
 Salaries A Expenses
 Abatement Control S
 Compl lance

Noise Regional
Implementation
 Salaries ft Expenses
 Abatement Control 4
 Compliance
             $774.0     $853.S
           $3,349.2   $3,056.1
             $328.1
             $346.1
             $652.9
              $24.9
             $351.7
             $294.3
             $853.7
             $192.2
TOTAL:
 Salaries & Expenses
 Abatement Control I
 Compliance

Noise Program
Strategies 8
Implementation
TOTAL
           $1,755.0   $2,058.9
           $3,720.2   $3,542.6
$5,475.2   $5,601.5

-------
                                                NOISE



                              Noise Program Strategies 4 Implementation

PERMANENT FULL-TIME HORKYEARS
Noise Control
Implementation 8
Evaluation
Federal Agency
Coordlnatlon-Moi se
Noise Regional
Implementation
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Noise Control
Implementation S
Evaluation
Federal Agency
Coordf nation-Noise
Noise Regional
Implementation
ACTUAL JANUARY MARCH CURRENT ESTIMATE INCREASE +
1981 ESTIMATE ESTIMATE ESTIMATE 1983 DECREASE -
1982 1982 1982 1983 VS 1982

14.4 17.1
6.5 6.0
13.4 16.5
34.3 39.6

22.3 24.1
7.3 7.8
22.6 25.7
TOTAL MORKYEARS                        52.2       57.6

-------
                                      NOISE

                   Noise Program Strategies  and Implementation

Budget Request

     Consistent with the Agency's decision to  phase-out the  noise  control program
In 1982, no resources are requested for ,1983,

Program Description

     This program provides assistance to  States and  localities  1n  the  development
and Implementation of  noise  control programs*  Effective State and local   noise
control programs are  useful  1n  reducing  noise to  levels commensurate with  the
protection of public health and welfare.   In recognition of this need, the  Noise
Control Act, as  amended by the  Quiet Communities Act,  calls  for EPA to  assist
State and local  governments  In the development of  noise control  programs.   The
objective of EPA's program 1s to substantially Increase the  number of  communities
having effective noise  control  programs  with  special  emphasis on lessening  the
impact of noise  from motor vehicles (motorcycles, trucks, autos).   Assistance 1s
also provided In the areas of stationary source control  (property line  standards),
construction site  noise  control,  noise  abatement  planning  (zoning,  land  use
planning, airport planning),  and public education.

     This program also  Includes the review of the  Implementation of  regulatory
requirements for which  the Federal  Government has  primary responsibility;  the
control of noise emissions at  Federal facilities,  and review of EIS's for noise
Implications, and the  overall   coordination  of all  Federal programs  for   noise
abatement and control.   The abjective of  this  program 1s to  bring  the  major noise
authorities of other Federal  agencies to bear on the  noise problem  in a  total
national effort.  Included are  such agencies  as the Federal Highway  Administra-
tion, the Federal Aviation Administration, the Urban Mass Transit  Administration,
the Department of Housing  and  Urban Development,  and the Department  of Defense.

     NoiseControl  Implementation andEvaluatlon—  Under the Noise Control Act,
as amended by  the Quiet  Communities  Act of  1978,  the Environmental   Protection
Agency delivers  assistance to  States and localities 1n order  to encourage  the
development of  effective noise  control.   Active State and local  1n-use   noise
control programs are needed to  form an efficient national network  that will  serve
to regulate non-local sources of noise.

     This program  provides  limited  financial assistance  through   cooperative
agreements to State and localities and the design  and administration of technical
assistance programs  for State  and local use.  Special  emphasis 1s  placed  on
helping States initiate programs to assist local communities start noise control
programs and to strengthen existing  local  programs.  Other EPA assistance includes
the Each Community Helps Other (ECHO) program (use of local  noise  control experts
(volunteers) to  help other communities),  development of State  and local program
"tools", e.g.,  model  laws  and  codes,   administration of the  noise  control
demonstration and assistance  program, and Technical  Assistance  Centers located at
ten universities.

     Federal Agency'Coordination — The activities  of this  program are directed
toward assuring  that "FederalGovernment   responsibilities for  noise control  are
met.  Such  activities  Include   assisting  other Federal agencies to consider  and
include, where  appropriate,   noise  abatement  and   control   practices  in   their
programs and  comply with Federal,  State,  Interstate,  and local  requirements;
coordinating noise control programs carried out by  Federal  agencies;  monitoring
the progress of  other Federal facilities'  noise abatement activities;  and review-
ing Federal environmental  Impact statements  insofar as their   noise  Impacts  are
concerned.
                                       N-14

-------
     Noise Regional Implementation -- Regional  offices provide  the focal  point
for EPA"interaction with  State  and local  governments, and Federal  assistance  1n
the development  of state  and  local  government  capabilities  to Implement  noise
abatement activities.    As  such,   they  provide  technical-financial  support  to
States and localities  and  oversee the operation of the several  University-based
Technical Assistance Centers

NOISE CONTROL IMPLEMENTATION AND EVALUATION
1981 Accompl1shments

     In 1981, the Agency obligated $4,123,200 for this program,  of which $774,000
was for Salaries  and Expenses and  $3,349,200 for Abatement,  Control, and  Com-
pliance.  These funds  were used for those  activities necessary for the  orderly
phase out  of  the  State  and  local  assistance  programs.   During 1981,  financial
assistance was provided to 22 State programs, which Included an  additional year's
funding (through the end  of  1982)  In order to prepare the  States  for  sustaining
the noise program as a  continuous  activity.   This program has assisted in  bring-
ing about: (1) an Increase in the number of active State  programs  from 9  in  1979
to 24 in  1981,  and  (2)  an Increase in  number  of  active local programs  from 90 in
1977 to over  300  in 1981.   Additionally, the Technical  Assistance Centers  were
gradually phased out during  1981  with two  being funded through 1982  to  provide
support to all operating State programs.  The Buy Quiet Program  produced procure-
ment specifications  on  two  products.  Over 70 governments and major  ut1111ties
have committed in writing to participate  In  the program.

1982 Explanation of Changes from January  Budget Estimate

                January          March            Current
                Estimate         Estimate         Estimate

               $3,909,600

     The net decrease of -$3,909,600 results from the following  action:

     -  January -March.   (-$3,909,600)  This change  represented  a decrease  of
     $3,Sos,600 from the  January budget, of which $853,500 was for Salaries and
     Expenses and 53,056,100  was  for  Abatement,  Control  and Compliance,  these
     reductions reflected  the  decision to  discontinue the noise program by the
     end of 1982.   All  resources for  the  orderly pnase-out are Included in the
     Environmental  Noise Strategies and Standards subset 1v1ty.

1982 Program

     No resources were  requested for  this  program  area in 1982.  A11  remaining
phase-out activities are  being  accomplished with resources 1n  the Environmental
Noise Strategies and Standards  subactivlty.  In 1982,  there will   be  ongoing
activities in the State  and local  area  to strengthen State and local noise control
programs to assume  complete responsibilities  for environmental noise problems;
to continue an  extensive  "Each Community Help Others" (ECHO)  program to  assist
cities, located 1n  States without  Noise Control  Programs, with  their capacity
building and  noise  abatement  efforts,  1nst1tut1onal1zat1on  of  the   Buy Quiet
Program into  the  government purchasing  process  throughout the  United  States
and arrange  for the transfer  of all  noise control  equipment  and documents  to
State governments for use  1n ongoing abatement programs.

1983 Program Request

     Consistent with the Agency's decision  to phase-out the noise control  program
in 1982, no resources are requested for 1983.
                                        N-15

-------
FEDERAL AGENCY COORDINATION

1981 Accompl1 shments

     In 1981, the Agency  obligated  $674,200 for this program, of which $328,100
was for  Salaries and  Expenses  and $346,100  was  for  Abatement,  Control, and
Compliance. These funds  were used  to  support  inter agency  agreements with  other
Federal agencies for the purpose of carrying out noise control  demonstrations and
test techniques and to  Incorporate  the results Into the appropriate programs  of
Federal agencies, Including EPA.  During 1981, most on-going  technology demonstra-
tions were  completed, and results  made available to  Interested  groups Including
other Federal and  State  agencies.   Aviation  studies underway  were continued.

1982 Explanationof Changesfrom January Budget Estimate

                January           March           Current
                Estimate          Estimate        Estimate

                $646,000

     The net decrease of -$646,000 results from the following  action:

     ~  January" March.   (-$646,000)   This  change  represented  a  decrease   of
     $646,000 from  the  January  budget, of  which $351,700 was for Salaries and
     Expenses and $294,300 was  for Abatement,  Control  and  Compliance,    these
     decreases reflected  the  decision  to discontinue  the  noise  program  by the
     end of  1982.   All  resources for  the  orderly phase-out are Included in the
     Environmental Noise Strategies and Standards subactivity.

1982 Program

     No resources were requested  1n 1982 for this program.  All  remaining phase-out
efforts are being accomplished with resources in the Environmental Noise Strategies
and Standards subactivity.  This work Includes the completion  of all  projects and
the transfer of appropriate Information to  Federal  and State  and local agencies.
Studies which provide  technical  assistance  for reducing noise  at airports are
being completed and distributed to airport  operators and State and local govern-
ments.

1983 Program Request

     Consistent with the Agency's decision to phase out the  noise control program
in 1982, no resources are requested for 1983.

NOISE REGIONAL IMPLEMENTATION

1981Accompl1shments

     In 1981, the Agency  obligated  $677,800 for this program, of which $652,900
was for Salaries and Expenses and $24,900 for Abatement,  Control,  and Compliance.
During 1981, the Regional  program provided for those activities  that were necessary
for the phase-out of the Region's  State and local  technical assistance program.

1982 Explanation of Changes from January Budget Estimate

               January            March            Current
               Estimate           Estimate         Estimate

              $1,045,900

     The net decrease of -$1,045,900 results from the following action:
                                      N-16

-------
                ,~ March'  (-$1,045,900)  This  change  represented  a decrease of
     $1,045,900 from the January budget, of  which  $853,700 was for Salaries and
     Expenses and  $192,200 was  for Abatement,  Control  and  Compliance.    These
     reductions reflected the  decision  to  discontinue the  noise  program  by the
     end of 1982.

1982 Program

     No resources were requested for this program 1n 1982.   All  remaining aspects
of phase-out are being handled by the EPA headquarters noise control program, and
accomplished with resources in  the  Environmental Noise  Strategies and Standards
s inactivity. The work  effort includes oversight of all remaining State Cooperative
Agreements and the phase-out of the  Regions'  State  and local technical  assistance
programs.

1983 Program Request

     Consistent with the Agency's decision  to phase-out the noise  control program
in 1982, no resources  are requested  for  1983.
                                      N-17

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                                  NOISE

                                                            Noise  Enforcement
                                                      ACTUAL
                                                        1981
                        JANUARY
                        ESTIMATE
                          1982
                        MARCH
                       ESTIMATE
                         1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
                  PROGRAM
                                                                (DOLLARS  IN  THOUSANDS}
f
i—
CO
                  Noise Enforcement
                  Salaries & Expenses
                  Abatement Control &
                  Compliance
                 TOTAL:
                   Salaries * Expenses
                   Abatement Control &
                   Compliance

                 Noise Enforcement
TOTAL
              $951.1   $1,101.0
              $103.7     $225.8
              $951.1
              $103.7
$1,054.8   $1,326.8
                  PERMANENT FULL-TIME HORKYEARS


                  Noise Enforceinent

                  TOTAL PERMANENT WORK YEARS
                19.4

                19.4
               19.2

               19.2

-------
                                                NOISE

                                          Noise Enforcement
                                     ACTUAL
                                      1981
        JANUARY
        ESTIMATE
          1982
         MARCH
        ESTIMATE
          1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
TOTAL WORK YEARS
 Noise Enforcement
28.5
35.3
 TOTAL WORK YEARS
28.5
35.3

-------
                                      NOISE
                                Noise Enforcement
Budget Request
     The Agency requests no funds and no permanent work/ears  for 1983.
Program DescHption
     The long-range goals  and  major objectives of the noise  enforcement  program
have been to assure that  regulated  products distributed  in commerce comply  with
Sections 6 and 8  (new  product  noise emission standards and  Information labeling
requirements respectively)  of  the  Noise  Control  Act  of  1972.   Additionally,
assistance has been given to State and  local  governments  in the development  of
effective noise enforcement programs to address compliance of  regulated products
In use.
NOISl ENFORCEMENT
1981Accomplishments
     In 1981, the Agency  obligated  a total  $1,054,800 for this  program of  which
$951,100 was for  the  Salaries  and  Expenses appropriation and  $103,700  was  for
extramural purposes under  the  Abatement,  Control  and Compliance  appropriation.
Extramural funds  were  used  to support  the State  and local  noise enforcement
effort (especially  for  anti-tampering   and  in-use  noise  control   requirements
which supplement  Federal  product regulations);  to evaluate  and summarize  pro-
duction verification  reports;   and   to   provide  for  engineering  and  technical
support services.
1982 Explanation ofChangesfromJanuaryBudgetEstimate
               January             March              Current
               Estimate           Estimate          Estimate
              $1,326,800
     The net decrease  of -$1,326,800 results from the following action:
     - January - March.   (-$1,326,800)   This  change  represented  a decrease  of
     Sl,326,8do from the  January budget,  of which  $1,101,000  was for Salaries
     and Expenses  and  $225,800 was  for  Abatement, Control  and Compliance.   This
     decrease represented  a  phase-out  of  Federal  noise  enforcement  activities
     and a  shift  in emphasis  to State and  local  noise  enforcement programs,
1982 Program
     No resources were requested 1n  1982,  consistent with  the  shift  in Agency
policy towards a  primary  state and  local  government  role  in reducing levels  of
environmental noise.
1983 ProgramRequest                         ;
     No resources are  requested for this program 1n 1983.
                                       N-20

-------
Page Intentionally Blank

-------
Interdisciplinary
       SECTION TAB

-------
Page Intentionally Blank

-------
                                             INTERDISCIPLINARY
                                    ACTUAL
                                     1981
                    JANUARY
                    ESTIMATE
                      1982
                        MARCH
                       ESTIMATE
                         1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
APPROPRIATION
 Salaries A Expenses
 Abatement Control 4
 Compliance
 Research & Development

TOTAL, Interdi scl pi 1 nary

PERMANENT FULL-TIME WORKYEARS
TOTAL HORKYEARS
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
        $9,392.0
        $1,406.2
                                             {DOLLARS IN THOUSANDS)
           $6,765,6  $10,092.2   $9,791.3  $15,437.6   $5,646.3
           $4,731.7   $4,654.3   $4,216.5   $2,709.8  -$1,506.7
        $3,117.7   $4,513.8   $4,246.9   $3,710.1   $2,590.7  -$1,119.4

       $13.915.9  $16,011.1  $18,993.4  $17,717.9  $20,738.1   $3,020.2

           186.9      144.0      206.8      196.4      310.3      113.9
           226.3      178.0      259.0      246.8      363.7      116.9
       $14,558.4  $32,822.0  $30,602.0  $20,047.1  $22,853.0   $2,805.9
       $22.848.0
Intermedia Non-Energy
 Salaries S Expenses
 Research & Development

 Salaries 4 Expenses
 Research 4 Development
RESEARCH t DEVELOPMENT
TOTAL
$2.856.4   $2,560.9   $2,237.4   $1,993.5   $1.622.0    -$371.5
$3,117.7   $4,513.8   $4,246.9   $3,710.1   $2,590.7  -$1,119.4

$2,856.4   $2,560.9   $2,237.4   $1,993.5   $1,622.0    -$371.5
$3,117.7   $4,513.8   $4,246.9   $3,710.1   $2,590.7  -$1,119.4
$5.974.1   $7,074.7   $6,484.3   $5,703.6   $4,212.7  -$1,490.9

-------
                                              INTERDISCIPLINARY


EIS Review and New
Source EIS Preparation
Salaries 8 Expenses
Abatement Control 1
Compl 1 ance
Accelerated Review 8
Permitting
Salaries 8 Expenses
Abatement Control 8
Compliance
Integrated
Environmental Assistance
Abatement Control 8
Compl 1 ance
Interdisciplinary
Technology Assistance
Salaries 8 Expenses
Salaries 8 Expenses
Abatement Control 8
ACTUAL
1981

$2,264.2
$1,179.4
$524.8
$61.1
$117.0
$32.4
$2,821.4
$1,357.5
JANUARY
ESTIMATE
1982
(DOLLARS
$2,401.1
$1,383.7
$1,803.6
$3,348.0


$4,204.7
$4,731.7
MARCH
ESTIMATE
19A2
IN THOUSANDS)
$2,401.1
$1,256.3
$1,814.1
$3,348.0


$4,215.2
$4,604.3
CURRENT
ESTIMATE
1982

$2,704.2
$818.5
$1,601.2
$3,348.0


$4,305.4
$4,166.5
ESTIMATE
1983

$1,905,2
$869.8
$1,805.4
$1,600,0


$3,710.6
$2,469.8
INCREASE +
DECREASE -
1983 VS 1982

-$799.0
$51.3
$204.2
-$1,748.0


-$594.8
-$1,696.7
 Compl1ance
ABATEMENT 8 CONTROL
TOTAL   $4,178.9   $8,936.4   $8,819.5   $8,471.9   $6,180.4  -$2,291.5

-------
INTERDISCIPLINARY

ACTUAL
1981
JANUARY MARCH
ESTIMATE ESTIMATE
1982 1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
(DOLLARS IN THOUSANDS)
Enforcement Policy &
Technical Support
Salaries & Expenses
Abatement Control &
Compliance
Salaries A Expenses
Abatement Control &
Compl 1 ance
ENFORCEMENT TOTAL
TOTAL PERMANENT WORKYEARS
Intermedia Non-Energy
RESEARCH S DEVELOPMENT TOTAL
EIS Review and New Source
E1S Preparation
Accelerated Review S
Permitting
Interdisciplinary
Technology Assistance
ABATEMENT « CONTROL TOTAL
Enforcement Policy 8
Technical Support
ENFORCEMENT TOTAL
$3.714.2
$48.7
$3.714.2
$48.7
$3,762.9
30.8
30.8
68.1
9.8
.8
78.7
77.4
77.4
$3,639.6
$50.0
$3.639.6
$50.0
$3.689.6
33.1 23.1
33.1 23.1
76.9 76.9
34.0 34.0
110.9 110.9
72.8
72.8
$3,492.4
$50.0
$3,492.4
$50.0
$3,542.4
23.9
23.9
71.7
32.5
104.2
68.3
68.3
$10,105.0
$240.0
$10,105.0
$240.0
$10,345.0
12.1
12.1
49.8
30.6
80.4
217.8
217.8
$6,612.6
$190.0
$6,612.6
$190.0
$6,802.6
-11.8
-11.8
-21.9
-1.9
-23.8
149.5
149.5

-------
INTERDISCIPLINARY

TOTAL HORKYEARS
Intermedia Non-Energy
RESEARCH ft DEVELOPMENT TOTAL
E!S Review and New Source
EIS Preparation
Accelerated Reviews
Permitting
Interdisciplinary
Technology Assistance
ABATEMENT & CONTROL TOTAL
Enforcement Policy S
Technical Support
ENFORCEMENT TOTAL
ACTUAL JANUARY
1981 ESTIMATE
1982
43.4 44.3
43.4 44.3
74.7 78.9
16.6 54.8
.8
92.1 133.7
90.8
90.8
MARCH
ESTIMATE
1982
34.3
34.3
78.9
54.8
133.7
91.0
91.0
CURRENT
ESTIMATE
1982
34.6
34.6
73.7
53.1
126.8
85.4
85.4
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
16.0
16.0
51.0
49.3
100.3
247.4
Z47.4
-18.6
-18.6
-22.7
-3.8
-26.5
162.0
162.0

-------
                               INTERDISCIPLINARY


OVERVIEW AMD STRATEGY

     The Environmental  Protection  Agency's  (EPA)  Interdisciplinary  program  1s
composed of  several  activities  that  cut  across  programmatic  lines  and  are
not readily assignable to a specific  media.  These programs  address  environmental
concerns that  affect several  media  and  require an  Interdisciplinary  approach.
The Interdisciplinary program Includes  the Exploratory  Research  program  within
the Research and Development function, the Environmental  Impact Statement and the
Accelerated Review  and   Permitting  programs within  the  Abatement  and  Control
function, and  components  of the Legal  and  Enforcement  Counsel  program  within
the Enforcement function.

     The overall  goals  of  the  Exploratory Research  program  are  to  provide  a
long-term perspective to  EPA's  research and  development activities  and  to  en-
hance the quality of mission-oriented research which  1s carried out by  grantees
of the Office  of  Research and Development and by the Centers  of Excellence, each
of which specialize 1n an area  of pollution  research.   In support  of these goals,
program activities  Include  the  Identification and  assessment  of  long-term  and
future scientific trends;  the  development of methods  to determine the  economic
benefits of pollution control  measures (required  by Excecutlve  Order 12291); and
the management  of a rigorous  peer review  system for  research grants to  ensure
that proposed  extramural  research  1s of high  scientific quality.  In  1982,  the
Minority Institutions Research Support program and  National Environmental  Work'
force activities  will be  Incorporated Into  the  Exploratory Research Competitive
Grants program.

     Environmental Impact Statements accomplish two statutory  objectives.   Under
the authority  of the National  Environmental  Policy Act (NEPA) and Section  309  of
the Clean A1r Act, EPA reviews  and  comments on proposed actions of  other Federal
agencies to ensure that public health and  the  environment are  protected.   Under
NEPA, EPA 1s  responsible for  preparing Its  own  environmental  Impact  statements
(EIS) or, alternatively, determining  findings  of  no significant Impact  (FNSI)  on
National Pollutant Discharge Elimination System permitting actions.

     In 1983,  EPA's Accelerated  Review  and Permitting  program  will   expedite
review and  permitting  of major  development projects.   The program accelerates
permitting of  such  activities  as  the National  Pollutant Discharge Elimination
System, waste  disposal   siting,  and  Prevention  of  Significant Deterioration.
EPA will  continue to assist other Federal  agencies  1n assessing  environmental
Issues.  This  Includes  preparing  EISs  for  projects  requiring   EPA   permits.

     In 1983 the  Interdisciplinary program  will  Include  two  major functions  1n
the Office  of  Legal  and Enforcement  Counsel that address the critical   need for
direction and  integration  of  EPA's legal  and  enforcement activities across all
media.  These  functions  are:   (1)  enforcement  policy  and  operations  and  (2)
technical support.

     Enforcement Policy  and Operations  provides  consistent   direction  to  EPA
enforcement for all media to assure  the  overall  quality of EPA enforcement.  To
accomplish these  goals,   1t establishes  strategies,   priorities,   policies,  and
procedural guidelines  so that  enforcement,  actions  are  properly  selected  and
prepared, and  1t  assures that these  policies  are correctly  Implemented  by  the
media enforcement programs  and  Regional  offices.   It  conducts  all  legal  case
development, litigation, and adjudlcatory hearing activities for media enforcement
programs; this Includes oversight of  evidence  gathering,  preparation, and manage-
ment of cases, and referral  of  cases  to  the  Department  of Justice  for litigation.
                                       1-5

-------
     The National  Enforcement  Investigations Center  (NEIC)  1n Denver  provides
specialized technical  expertise  1n  support of  EPA enforcement case  preparation
activities.  NEIC  serves  as  a  point  of coordination  and  support  for  complex
investigations that  have a national  impact on EPA and State  regulatory  programs.
NEIC provides national expertise to EPA Headquarters and  Regions  in evaluating  a
broad range of waste,  discharge!  disposal,  and emission  problems.
                                       1-6

-------
                               INTERDISCIPLINARY


SUMMARY OF INCREASES ANDDECREASES

                                                        (In thousands  of dollars)

     1982 Interdisciplinary Program	             $17,717.9

        Salaries and Expenses	             +5,646.3

        This increase is due to an increase  of workyears
        in Enforcement Policy and Operations, an activity
        which has been newly  reorganized  into the  Inter-
        disciplinary program.  This  is partially  offset
        by small  decreases  in  Exploratory Research  and
        EIS Review  and  Permitting activities  workyears.

        Research and Development..	             -1,119.4

        This decrease reflects  the incorporation of  En-
        vir Environmental  Workforce activities and  Minor-
        ity Institutions Research  Support  into the Explor-
        atory Research Competitive grants  program, as well
        as, termination  of  the Environmental  Indicators
        research efforts.

        Abatement, Control  and Compliance	             -1,506.7

        This decrease  in  extramural   support  primarily
        reflects decreased reliance on contracts in Accel-
        erated Review and  Permitting   activity as  the
        Agency focuses on high-priority projects and  re-
        duces its role in less important projects.

     1983 Interdisciplinary Program	             $20,738.1


SUMMARY OF CHANGESTOJANUARY 1982 BUDGETESTIMATE

                                                        (in thousands  of dollars)
     January 1982 Estimate...	             $16,011.1

        January-March	                -707.3

        Restructurings	              +3,689.6

        Repr ogrammi ngs	                 -46.2

        Congressional Actions	              -1,232.6

        A decrease of $1,651,600  to  Abatement,  Control
        and Compliance  and  a  decrease  of  ,$189,800  to
        Research and  Development were  taken 'against  the
        March estimate to  reflect  the  September  12%  re-
        duction.  Congress  restored  $1,413,800  to  the
        Abatement, Control  and  Compliance  appropriation
        for accelerated review and  permitting.   An
        additional $605,000  was applied  to  the  Salaries
        and Expenses  appropriation  to meet Congressional -
        ly mandated appropriation levels.
                                       1-7

-------
                                                   (in thousands of dollars)
   Transfer Authority	                  +3.3

   A net  increase  of  $3,300  was  transferred  to
   this program  as  follows:   $200,000  was  trans-
   ferred from  Abatement,   Control  and  Compliance;
   5347,000 was transferred from Research and
   Development; and $550,300 was transferred to
   Salaries and Expenses.

Current 1982 Estimate	>			             $17,717.9
                                  1-8

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                           INTERDISCIPLINARY

                                                         Intermedia Non-Energy
                                                      ACTUAL
                                                       1981
                                               JANUARY
                                               ESTIMATE
                                                 1982
           MARCH
          ESTIMATE
            1982
        CURRENT   ESTIMATE INCREASE +
        ESTIMATE    1983   DECREASE -
          1982            1903 VS 1982
                 PROGRAM
                                                               (DOLLARS IN THOUSANDS)
i
1C
Exploratory Research
Core Program
 Salaries « Expenses
 Research fi Development

Minority Institutions
Research Support
 Salaries 8 Expenses
 Research 8 Development

National Environmental
Work force
 Salaries 8 Expenses

TOTAL:
 Salaries & Expenses
 Research A Development

Intermedia Non-Energy   TOTAL
                                                    $1,945.0   $2,221.3   $2,237,4   $1,993.5   $1,622.0   -$371.5
                                                    $3,117.7   $3,793.0   $4,246.9   $3,710.1   $2,590.7 -iljll9.4
                                                      $792.8
                                                      $118.6
$122.6
 720.8
$217.0
                                                    $2,856.4   $2,560.9   $2,237.4   $1,993.5   $1,622.0   -$371.5
                                                    $3,117.7   $4,513.8   $4,246.9   $3,710.1   $2,590.7 -$1,119.4

                                                    $5,974.1   $7,074.7   $6,484.3   $5,703.6   $4,212.7 -$1,490.9
                 PERMANENT FULL-TIME WORKYEARS
                 Exploratory Research
                 Core Program

                 Minority Institutions
                 Research Support

                 National Environmental
                 Workforce
                                       25.2


                                        2.1


                                        3.5
  24.1


   3.0


   6.0
23.1
23.9
12.1     -11.8

-------
I
»-•
o
                                                            INTERDISCIPLINARY



                                                          Intermedia Non-Energy



                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +

                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -

                                                                   1982       1982       1982            1983 VS 1982
TOTAL PERMANENT WORKYEARS
TOTAL H0RKYEARS
Exploratory Research
Core Program
Minority Institutions
Research Support
National Environmental
Workforce
TOTAL WORKYEARS
30.8 33.1 23.1 23.9 12.1 -11.8
37.8 34.6 34.3 34.6 16.0 -18.6
2.1 3.0
3.5 6.7
43.4 44.3 34.3 34.6 16.0 -18.6

-------
                                INTERDISCIPLINARY

                              Intermedia (ton-Energy

Budget Request

    The Agency  requests  a total  of  $4,212,700  and 12.1  permanent workyears  for
1983, a decrease  of  $1,490,900  from 1982.  Included in this  total  1s $1,622,000
for Salaries and  Expenses  and 32,590,700 for Research and Development,  with  de-
creases of  S371.500  and 11.B permanent workyears In  Salaries  and Expenses  and
$1,119,400 in  Research and Development.   The decrease reflects a reduction  in
the National Environmental Workforce  activities  and  the termination  of the envi-
ronmental indicators activities.

Program Description

    The objectives of the Intermedia Non-Energy  Exploratory Research  Core Program
are to:  (1) Identify and assess long-term scientific  trends, problems and opportu-
nities; (2) develop defensible methods to Improve the Agency's ability to perform
cost-benefit analyses  of  major  regulations;  and (3)  manage a Competitive Grants
and Centers of Excellence  program, designed to fill in gaps in the Agency's science
and engineering  knowledge base.  To achieve these  objectives,  the program  is
organized into  two  separate  but Interdependent components  with the  following
functions:

    Strategic Assessment and Special  Studies. This  program  provides  strategies
and guidance on etnergingan
-------
    -  Review  of a draft report on  current and future problems 1n  the  Sun  Belt
       Region, which  will  provide information  to  identify future  high-priority
       multi-state problems requiring further investigation,

    -  Producing a detailed work  plan for assessing health and  environmental  prob-
       lems associated with major changes in United States industry, particularly
       the chemical industry.

    -  Completion  of reports  undertaken  by  Summer Research Fellows,  including
       natural sources of NOx and genetic diversity.

    -  Conducting six seminars identifying future environmental  trends,  problems,
       and opportunities, Involving such topics  as  environmental implications  of
       changing energy  use  patterns  and  assessments  of  future  environmental
       trends in Western European nations.

    -  Completion  of major  reports  by  the Mussel  Watch Program  on trends  in
       the accumulation  of  toxic   chemicals  In  the  marine  biota along  the
       coastlines of the United States.

    During 1981, major reports were completed on the economic  benefits of air and
water pollution and  on the advantages and  disadvantages  of using economic Incen-
tives for pollution  control.   The  air  pollution report Included research on the
economic benefits derived from:  (1) air  pollution control In the  San  Francisco
region, (2) protection of visibility 1n some  Western national parks,  (3)  control
of acid  rain,  and (4)  reduction  of household  soiling  resulting   from  airborne
particulates.  An  analysis  of  air pollution  control  1n  Los Angeles  was  also
reported, Indicating  that  benefits  appear to  exceed  costs  at  current  levels.
The water pollution report derived new methodologies and data on the  benefits  of
Improved freshwater recreational fishing, the  use  of contingent valuation tech-
niques to determine water benefits, and the estimation of  water health  benefits.
The economic incentive  study  will  be published during 1982; the  air and water
reports are undergoing peer review.

    In 1981,  the  Competitive  Grants   and  Centers  programs carried   out  the
long-term environmental   research  program mandated  by Public Law  96-569.   Peer
review panels in Environmental Biology, Chemistry  and Physics, Health,  and Engi-
neering and  Pollution Contol  reviewed  approximately  1,000  proposals  of which
Z37 were determined  to  be  meritorious  and were  recommended for funding.  These
projects will greatly enhance  the  Agency's  efforts to:  (1) improve  the  quality
of scientific Information on  which Agency  decisions are  based, (2)  Investigate
long-range solutions  to  currently  Intractable  problems,  and (3)  focus a  portion
of the science community on  newly-emerging  environmental  problems.   During 1981,
workshops were held  by the  peer  panels to  extensively  review the progress  of
projects underway.

     The Exploratory  Research Centers of Excellence program has provided  adminis-
trative support for the following seven  Centers:

     Marine Research  Centerat the  University of Rhode Island.  The  Center has  de-
veloped effectivei measurement  and  assessment  methods for  determining the health
of marine ecosystems  1n  relation to  level  of contamination.  The Center  Is  also
Improving techniques   for Identifying  sources,  pathways,  and  processes  which
influence exposures of man  and marine biota to toxic substances.

     Groundwater Research Center, a Consortium of the Unverslty of Oklahoma.
Oklahoma state Uini yersi ty,  and R1 ce Unl yersi ty.   Key 1 n'formatl on has been  deri ved
by thfs Center in the areas of transport and fate of pollutants, characterization
of the subsurface environment,  and  modeling of the  groundwater horizon.

     Epidemiology Research  Center at  the University of  Pittsburgh.   The Center
conducted a state-of-the-art  symposium  on epidemiology  In ;isWl.   The Center  is
                                       1-12

-------
advancing understanding  of environmental  health  problems  through long-term  re-
search in the specific areas of airborne particulates, indoor exposures,  drinking
water, cardiovascular disease, and basic epidemic! ogic methodology.
     Advanced Control Technology Center at L the University of 111 ign1sA Urbana.
In conjunctTon with  industry scientists and engineers, the Center"!?  furthering
the basic concepts of  pollution control specifically in the areas  of  separation
technology, thermal  destruction,  biological  degradation, and  chemical  detoxifi-
cation.

     intimate Waste Elimination Center at Illinois Institute of Technology.
Working closely  with industry  researchers,  the  Center Is examining  Innovative
approaches and process modifications to reduce or eliminate pollutant by-products
while maintaining or enhancing manufacturing productivity.

     Intermedia Transport Research Center at the University of  California,  Los
Angeles.  The Center Is providing  valuable  insight into  the  movement of  toxic
cheml cal s at the air-land  and  air-water interfaces,  thus increasing the Agency's
ability to assess potential exposures and impacts of toxic chemicals  and elements.

     Ecosystem Research Center at Cornell University.  The  Center  is  developing
systeros-"level ecology  concepts  geared specif icai 1y to support  decision-making
in environmental  protection  efforts.  The key objective  is to  determine the most
cost-effective ecological information needed for sound  decision-making.

1982 Expl anati on of Changes^ fj'omJanuaryB^

                      January        March           Current
                     Estimate       Estimate        Estimate

                   $6,014,300     $6,484,300      $5,703,600

     The net  decrease   of  -$310,700  results from  several  actions as  follows:

     -  January _- March.   (-$151,500)   This  change represented  a decrease  of
        5151,500 from the January budget for Salaries and Expenses.   The decrease
        resulted in  a  reduction of  studies  to Identify and  test  indicators  of
        long-term trends in environmental quality.

     -  Restructuring.    (+$621,500)   Resources  from  the  Minority  Institutions
        Research Support  ($473,700)  and the  National  Environmental   Workforce
        ($147,800) programs  have been  combined  with  the  Exploratory  Research
        Core Program.  This  restructuring will have little  affect upon  the  func-
        tions of the resources.  The  Agency  will  continue  to  encourage minority
        institutions to  participate  in the  grant  funding  mechanism and fulfill
        Congressional and  administrative  commitments  for  special  assistance  to
        qualifying institutions.  The Agency will  continue  National  Environmental
        Workforce activities.

     *  Deprogramming.    (-$41,900)   An  Agency-wide  reprogramming  of -$5,100
        prbvfde
-------
        Research and Development appropriation to reflect final Congressional ac-
        tion on  our 1982  appropriation's  Bill.   A  reduction  of -$202,000  was
        applied to the Salaries and Expenses appropriation to meet Congressionally
        mandated appropriation levels.

     -  Transfer Authority.  (-5347,000)  The net change applied to this activity
        is made up of a decrease of -$347,000 to Research and Development to fund
        critical expenses.

1982 Program

    In 1982, the  Agency 1s allocating  a  total  of $5,703.600 and  23.9 permanent
workyears to this program, of which $1,993,500 is under the Salaries and Expenses
appropriation and $3,710,100  is for  extramural  purposes under the  Research  and
Development appropriation.

    The 1982 Strategic  Assessment  and  Special  Studies  program will  produce the
following outputs:  (1) revision and  updating analysis  of future emission trends
for use in  the Environmental Out!ook  report;  (2)  conducting  eight new  special
assessments of  selectees emerging  or future environmental problems,  such  as pro-
jection of  future  ground  water contamination  on a  geographical  basis,  and  an
assessment which compares  ocean disposal  of waste to other waste disposal alter-
natives; (3) completion of analysis  of problems in Sun Belt  region;  (4) report
on future problems  resulting  from  changes  1n United States industry,  the focus
of which is to identify long-term research priorities based on an Improved under-
standing of potential  economic  and  environmental  trends  that  cut  across segments
of the Nation's  industries;  (5)  conducting a  seminar  series  undergoing issues
associated with  risk-benefit   computations;  (6)  continuing the  Summer  Fellows
program; and (7) conducting a program review of environmental  indicators'  efforts
(including the Mussel  Watch and Pilot Specimen Bank programs).

     The 1982 economic  benefits research program has been  substantially  revised
to focus  on methods  and  data  development  of  particular  use in  carrying  out
Executive Order 12291,  which requires cost-benefit analysis of most major Federal
regulations.  In 1982, this program emphasizes  improved  methodologies  for deter-
mining the benefits of  water pollution  control  regulations, for carrying  out the
analyses required under the Executive Order, and  for  completing a major study  of
the benefits of  improved  visibility  in the Eastern  United States  to determine
the benefits of related ambient standards.

    It Is anticipated  that the Competitive Grants  program  will again  receive a
large number of proposals  in 1982.  The number  of new proposals funded will drop
as a  result of  the increasing  number  of  previously  awarded grants  requiring
continuation funds.   A  series  of  seminars will  be conducted where  grantees will
present their project results  to peers,  Agency specialists, and Interested  public.

    The Centers  of  Excellence  program  will  add  a  new  Center  1n  1982 and will
evaluate the existing  seven  Centers.  A  new  Hazardous  Waste Research  Center  at
Louisiana State University will be  initiated in  1982.  The  Center will  study the
design, construction,  maintenance,  operation,  and  closure of hazardous  waste
landfills  and facilities.  Research will also include remedial  activities  related
to the problems unique to  spills and  other  emergency  situations.  A major review
of the results  obtained by each  of the Centers  will  be conducted  to determine
effectiveness of existing  Centers.  Recommendations based on this  review  will  be
prepared.                                       ;

    The Minority  Institutions   Research  Support program   is  moving  closer  to
completing its  objectives  in 1982.  In  order  to continue to promote the partici-
pation of minority institutions in  the  Competitive  Grants program,  the Agency  is
establishing an  Ombudsman  function  within the  Office  of Research  Grants  and
Centers to  aid  eligible   institutions  to  compete  better  within  the Agency's
competitive research grants.
                                        1-14

-------
                       The  1982  National  Environmental  Workforce program 1s  continuing to provide
 ;                  support to  the Agency.   This program Mill establish  a  volunteer Senior Environ-
 /                 mental Assistance  program  In  support  of State  environmental  agency workforce
                   needs, continue  to promote the  use of senior  citizens working  for  EPA through
                   the  Senior  Environmental Employment  program,  develop  three  additional  Minority
                   Research  Apprenticeship  programs,  and develop  and manage an  estimated 50 grants
                   for  academic training.

                   1963 Program Request

                       The  Agency  requests a  total of $4,212,700 and 12.1  permanent workyears for
                   this program,  of which  51,622,000  1s for the Salaries and Expenses appropriation
                   and  $2,590,700 is  for the Research and Development appropriation.  This reflects
                   a  decrease  of  $371,500  In  Salaries and Expenses and $1,119,400  1n  Research and
                   Development.   The  decrease  results  from a  reduction 1n  National  Environmental
                   Workforce activities  and  termination  of  support to  environmental  Indicators
                   research  efforts.   For  1983, the  National  Environmental Workforce  program will
                   continue  the activities  described  1n 1982 at a  reduced level which reflects the
                   reduction in Workforce funding to the Agency by  the Department of  Labor.  Research
                   on environmental indicators is terminated because of overall Intermedia priorities
                   such as  increased  economic benefits  research  and continued commitment  to the
                   Centers of  Excellence and the Competitive Grants program.

                       The  1983  economic  benefits  research program  will  be substantially expanded
                   in order  to help  the  Agency  meet  the  new requirements  Imposed by Executive
                   Order 12291.   In addition to further research on new general air and water benefit
                   methodologies, the  program  will develop  Improved specific  methods  for valuing
                   the  benefits  of Individual  regulations for hazardous  waste, toxic   substances,
                   effluent  guidelines, municipal waste, ocean  dumping, hazardous air, and radiation.
                   The  general  water  benefits research 1s  expected to Include reports  on marine
                   fishing benefits,  the use  of  contingent valuation  data to  determine benefits,
                   and  the  development  of  methods  for  assigning  benefits  to  individual discharge
                   regulations.   The  program  will  also  provide  expanded  technical expertise and
                   research  support on  request to  the Agency  program  offices  1n  their efforts to
•*.                  prepare cost-benefit  analyses for specific regulations.

 '•                      The  1983  Strategic  Assessment and Special  Studies  program will provide data
                   on future  changes  In  pollutant  characteristics of  industries.   This  effort
                   will ultimately  be valuable in  regional Industrial developments, specifically in
                   the siting  of  new  industrial developments.

                       The  Agency  will  continue the  Centers  of Excellence program and the Compe-
                   titive Grants  program.   For 1983,  the Agency  again  expects to  receive a large
                   number of proposals.   Emphasis  of the  program  will  be dissemination  of results
                   of completed  projects,   monitoring  of  projects  underway, and coordination  with
                   the Agency  research planning process and other Federal agencies.

                       For  1983, the National Environmental  Workforce program will continue the
                   activities  described in  1982 at a reduced level  of  effort. The Ombudsman function
                   for minority research support will  be continued.

                   MINORITY  INSTITUTIONS RESEARCH SUPPORT

                   1981 Accomplishments

                       In 1981,  the  Agency used a total  of $792,800 for  the Minority Institutions
                   Research  Support  program,  all   of  which  was   under  the  Salaries and  Expenses
                   appropriation.

                       The  program  awarded $1,257,008 to  13 minority  institutions and  provided
                   technical assistance  in the development and writing  of  research proposals  from
                   many others.   There  were 115 institutions  in  the  United  States eligible for
                   participation, and 33 applications  were  received and-peer reviewed.  The program's
                                                          1-15

-------
budget was  augmented by  $567,000 used  to  fund  applications that  successfully
competed in the regular Competitive Grants program.

1982 ^Explanation of Changes from January Budget Estimate

                      January        March           Current
                     Estimate       Estimate        Estimate

                     $843,400

     The net  decrease  of  -$843,400  results  from several  actions,  as  follows:

     "  january - March.   (-$369,700)   This  change  represented a  decrease  of
        $369,71)0 from the January budget, of which $102,800 was from  Salaries and
        Expenses and $266,900  was  from Research and  Development.  This  decrease
        resulted In the partial incorporation of the Minority Institution Research
        Support function into the Exploratory Research Core Program.

     "  Restructuring.   (-$473,700)  These resources  are  being  combined  with the
        existing Exploratory Research Core Program.  This restructuring will  have
        little affect upon the functions of  the resources.  EPA  will  continue to
        encourage minority  institutions  to  participate  in  the  grant   funding
        mechanism, and  fulfill  Congressional and  administrative commitments  for
        special assistance to qualifying institutions.

1982 Program

     The resources and activities  formerly located in this program,  are  absorbed
into the Exploratory Research  Core Program during 1982 and are  being  continued.

IBB3 Program Request

     No resources are  requested for this  program element  in  1933,  because  the
Ombudsman function was  incorporated  into the  Exploratory Research  Core  Program
in 1982.

NATIONAL ENVIRONMENTAL  WORKFORCE

1981 Accoinpl 1 shments

     In 1981, the Agency used a total of $118,600  for this program, all of  which
was under the Salaries  and Expenses appropriation.

     In 1981,  the  National  Environmental   Workforce program  accomplished  the
following:

     -  Developed and  managed  a variety  of academic training programs  designed
        to meet Federal,  State  and local  environmental workforce  needs.

     -  Developed and  conducted a national  conference on meeting environmental
        workforce needs.

     -  Developed and  conducted  a  mini-conference on health and the environment
        for the White House Conference  on Aging.

     -  Chaired  and  provided  staff  assistance  to  the  EPA  National  Workforce
        Coordinating Committee.

     -  Provided technical  assistance and advice to State and  local environmental
        agencies 1n developing  environmentally-related older worker  and coopera-
        tive education  programs.
                                      1-16

-------
     -  The  Senior Environmental  Employment  Corps employed  76  senior  citizens
        at the Agency  1n 1981.  The work  these  individuals  perform is  often  in
        technical, professional functions,  such as  chemistry, engineering, and
        biology.

1982 Explanationof Changes from January Budget Estimate

                      January        March           Current
                     Estimate       Estimate        Estimate

                     $217,000

     The net decrease  of  -$217,000  results  from  several actions,  as  follows:

     -  January - March.   (^$69,200)   This  change  represented  a  decrease   of
        $69,200 from  the January  budget, all  of  which  was for  Salaries and
        Expenses,  This  decrease   resulted from  the  partial incorporation   of
        the Workforce  function  into  the  Exploratory   Research   Core  Program.

     -  Restructuring.  (-$147,800)  These resources are being combined  with the
        exi sting  Expl oratory Research Core Program.   This restructuring will have
        little affect upon the functions  of the  resources.   In 1982, EPA is con-
        tinuing the National Environmental Workforce program.

1982 Program

     The resources and  activities  formerly located in this program  are  absorbed
into the Exploratory Research  Core  Program  by  1982  and are  being  continued.

1983 Program Request

     No resources  are  requested for this  program  element in 1983,  because the
functions and  activities of  this  program  are now  located   in  the Exploratory
Research Core Program.
                                      1-17

-------
Page Intentionally Blank

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                E1S Review and Ne« Source EIS Preparation
                                     ACTUAL
                                      1981
            JANUARY
            ESTIMATE
              1982
                                                           MARCH
                                                          ESTIMATE
                                                            1982
CURRENT
ESTIMATE
  1982
ISTlMATt IMCMAte +
  1983   DECREASE -
        1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Environmental Impact
Statement Review
 Salaries S Expenses

NEPA Compliance/Els
Preparation-New
Source Discharge Permits
 Salaries S Expenses
 Abatement Control &
 Compliance
$1,869.1 / $2,041.4   $2,041.4   $2,130.4   $1,786.5   -$343.9
  $395.1/   $359.7     $359.7     $573.8     $118.7   -$455.1
$1,179.4   $1,383.7   $1,256.3     $818.5     $869.8     $51.3
TOTAL:
  Salaries & Expenses
  Abatement Control &
   Compl lance

Environmental Impact
Statements
                        TOTAL
                                   $2,264.2   $2,401.1   $2,401.1   $2,704.2   $1,905.2   -$799.0
                                   $1,179.4   $1,383.7   $1,256.3     $818.5     $869.8     $51.3
$3,443.6   $3,784.8   $3,657.4   $3,522.7   $2.775.0   -$747.7

-------
                                                          INTERDISCIPLINARY

                                                EIS Review and New Source EIS Preparation

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                 1982       1982       1982            1983 ₯S 1982
                PERMANENT FULL-TIME WOftKYEARS



                Environmental Impact                   54.6       64.9       64.9       60.7       46.8     -13.9
                Statement Review

                NEPA CompH<\nce/E!S                    13.5       12.0       12.0       11.0        3.0      -8.0
M ,              Preparation-Mew
,1               Source Discharge Permits
vo
                TOTAL PERMANENT HORKYEARS              68.1       76.9       76.9       71.7       49.8     -21.9


                TOTAL MORKYEARS
                Environmental Impact                   60.8       66.9       66.9       62.7       48.0     -14.7
                Statement Review

                NEPA Compliance/Els                    13.9       12.0       12.0       11.0        3.0      -8.0
                Preparation-New
                Source Discharge Permits

                TOTAL HORKYEARS                        74.7       78.9       78.9       73.7       51.0     -22.7

-------
                               INTERDISCIPLINARY


                    EIS Review and New Source EIS Preparation
BudgetRequest
     The Agency requests  a  total  of $2,775,000 and 49.8  permanent  workyears  for
1983, a decrease of $747,700 and 21.9 permanent workyears from 1982.  Included in
this total  Is  $1,905,200  for Salaries  and Expenses and  $869,800 for Abatement,
Control and  Compliance,  a  decrease  of  $799,000  and   an  Increase  of  $51,300
respectively.

Program Description

     This subactlvity  Includes  the review  of environmental  Impact  statements
and the preparation of EISs for  new source National  Pollutant Discharge
Elimination System permitting actions.

     EIS Review — The  National  Environmental  Policy  Act (NEPA) and  Section  309
of the Clean Air Act require EPA to  review and comment on EISs and on the environ-
mental Impact of any major  legislation, regulations or  other actions proposed by
other Federal agencies.   In this  way,  EPA helps to  protect  public health and  the
environment.  The  program strives  to  resolve   Interagency  environmental  contro-
versies through:  (1)  effective  liaison with other Federal  agencies,  (2)  early
Identification of  significant environmental  Issues, and  (3)  timely  review of  and
comment on major actions.

     New Source EIS Preparation  ~ Under Section 511(c)(l) of the Clean Water Act,
EPA is"responsible  for™issesslng  the environmental Impact of  new  source National
Pollutant Discharge Elimination System  permitting actions 1n those  states  where
the permitting program has  not  been delegated.  The assessment takes  the form of
an EIS or, alternatively,  a finding of no significant Impact (FNSI).

EIS	REVIEW

1981. Accompl 1 shments

     In 1981, this program obligated $1,869,100, all of which was for the Salaries
and Expenses appropriation.  The Agency  placed emphasis on identifying and resolv-
ing environmental  concerns  at an  early  stage in the project development process.
In addition, the Agency reviewed  and commented on  over 500 draft  and  400  final
environmental impact statements.

1982 Explanation of Changes from January Budget _|st1mate

                  January        March           Current
                 Estimate       Estimate        Estimate

                $2,041,400     $2,041,400      $2,130,400

     The net  Increase  of  +$89,000  results from several  actions, as  follows:

         Reprograircnlng. (+$134,800)  During the development of the operating plan,
     severa 1 ml scel laneous  reprogranmrings,  which  are  not reportable to Congress,
     were made  to  this activity  and  resulted  1n a  net increase  of  +$134,800.

     -  Congressional Actions.  (-$51,800)   A  reduction of -$51,800  was applied
     to thei Salaries  and  Expenses appropriation to  meet Congressionally mandated
     appropriation levels.
                                        1-20

-------
     •  Transfer Authority.  (+$6,000)  The net Increase applied to this activity
     1 ncludes an Increase  of +$6,000  to Salaries and Expenses  to  fund necessary
     operating expenses.

1982 Program

     In 1982, the  Agency  1s allocating a total of  $2,130,400  and  60.7 permanent
workyears to this  program,  all  of which 1s for the Salaries and Expenses  appro-
priation.  EPA will  continue to  Identify  and resolve environmental  concerns at
an early  stage  In  the project  development  process.   It  1s  expected that  the
agency will review over 500 draft and 400 final EISs.

1983 Program Request

     The Agency requests  a total  of $1,786,500 and 46.8  permanent workyears  for
this program, all  of  which 1s for  the Salaries  and Expenses appropriation,  a
decrease of $343,900 and  13.9 permanent workyears.  The  reduction  reflects EPA's
emphasis on  Identifying  and resolving  environmental  concerns  at  an  early  stage
in the project development process.   It 1s expected that the Agency  will  review
and comment on 500 draft and 200 final EISs.

NEKSOURCE EIS PREPARATION

1981 Accompl1shments

     In 1981,  this  program obligated  $1,574,500  of  which  $395,100  was  for
Salaries and Expenses  and  $1,179,400  was  for Abatement,  Control and  Compliance.
The Agency completed seven draft  and  eight final  EISs.   In addition,  three area-
wide studies were  completed that  were used  to analyze the consequences of mining
plans for various sections of the country.

1982 Explanation of Changes from January Budget Estimate

                  January        March           Current
                 Estimate       Estimate        Estimate

                $1,743,400     $1,616,000      $1,392,300

     The net decrease  of  -$351,100  results  front several  actions,  as  follows:

     -  January -	March.   (-$127,400)   This  change  represented   a decrease  of
     $12/V4oGfrom the January  budget,  all  of  which  was for Abatement,  Control
     and Compliance.  This  resulted 1n  the  preparation of one  less environmental
     Impact statement.

     -  Reprogrammlng.   (+$57,300)  During  the development of the  operating plan,
     severaT miscellaneous  reprograwnings,   which are  not  reportable to Congress,
     were made to  this activity  and resulted  In  a  net Increase of  +$57,300.

     -  Congressional Actions.   (-$283,300)   A  reduction  of -$237,800  was  taken
     against the March  estimate  reflecting  the September  12%  reduction to  the
     Abatement,  Control and Compliance  appropriation resulting 1n approximately
     two fewer environmental Impact statements Initiated.

        An additional  reduction   of  -$45,500  was applied  to   the Salaries  and
     Expenses appropriation to  meet Congessionally mandated appropriation  levels.

     -  Transfer Authority.  (+$2,300)  The net Increase applied to this activity
     Includes a decrease of -$200,000 to Abatement, Control  and Compliance and an
     Increase of+$202,300 to Salaries and Expenses for essential operating costs.
                                       1-21

-------
1982 Program

     In 1982, the Agency  Is allocating a total of  $1,392,300  and 11.0 permanent
Morkyears to  this  program, of  which  $573,800 1s  for  the Salaries and  Expenses
appropriation and $818,500 1s for extramural purposes under the Abatement, Control
and Compliance  appropriation.   The  emphasis in this program will shift  to  com-
pleting those EISs currently  1n process,  rather than Initiating new EISs.  It 1s
•expected that nine draft and nine final EISs will  be completed.

1983 Program Request

     The Agency requests a total of $988,500 and 3.0 permanent workyears for this
program, of which  $110,700 1s  for  the Salaries  and Expenses  appropriation  and
5869,800 1s for the  Abatement,  Control and Compliance appropriation.  This  1s a
decrease of $455,100 and  an Increase  of $51,300  respectively.  The  reduction
reflects the  shift  away from Initiating  new EISs  and towards  completing  those
already in progress,  which  leaves  fewer  EISs "in  the pipeline."  At  a  minimum,
however, 1t 1s  expected that one draft and five  final  EISs will be  completed.
                                        1-22

-------
                                          INTERDISCIPLINARY

                                   Accelerated Review 8 Permitting
                                     ACTUAL
                                      1981
                       JANUARY
                       ESTIMATE
                         1982
                      MARCH
                     ESTIMATE
                       1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Accelerated Review S Permitting
 Salaries & Expenses
 Abatement Control &
 Compliance

TOTAL:
 Salaries ft Expenses
 Abatement Control S
 Compliance
Accelerated Review 4
Permitting
TOTAL
             $524.8/11,803.6   $1,814.1   $1,601.2   $1,805.4    $204.2
              $61.1   $3,348.0   $3,348.0   $3,348.0   $1,600.0 -$1,748.0
             $524.8   $1,803.6   $1,814.1   $1,601.2   $1,805.4    $204.2
              $61.1   $3,348.0   $3,348.0   $3,348.0   $1.600.0 -$1,748.0
$585.9   $5,151.6   $5,162.1   $4,949.2   $3,405.4 -$1,543.8
PERMANENT FULL-TIME WORKYEARS
Accelerated Review
I Permitting
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Accelerated Review
TOTAL MORKYEARS

& Pentti tting

9.8
9.8

16.6
16.6
34.0
34.0

54.8
54.8
34.0
34.0

54.8
54.8
32.5
32.5

53.1
53.1
30.6
30.6

49.3
49.3
-1.9
-1.9

-3.8
-3.8

-------
                            INTERDISCIPLINARY

                    Accelerated Review and Permitting
Budget Request
     The Agency requests  a  total  of $3,405,400 and 30,6 permanent  workyears  for
1983, decreases of  $1,543,800  and of 1.9 workyears from 1982.   Included  In this
total is  $1,805,400  for  Salaries  and Expenses  and  $1,600,000  for  Abatement,
Control and  Compliance,  an  Increase  of  $204,200 and a  decrease  of  $1,748,000
respectively.

ProgramDescription

     This program element  consists of  resources  for the accelerated  review  and
permitting program.   It  1s  Intended to  expedite development of  energy-related
and other  Important projects In  an  environmentally  sound manner.   It auguments
the resources  of  EPA's  permitting, environmental  Impact statement  (EIS)  review,
and EIS preparation programs.   Carried  out by the  Regional  offices  with  guid-
ance from the  Office of  Federal Activities, this program accelerates  permitting
of such activities  as waste disposal   siting,  the  National  Pollutant Discharge
Elimination System,  Prevention  of Significant  Deterioration,  and  underground
Injection.  As a  cooperating agency,  EPA also assists other Federal  agencies 1n
the preparation of  EISs  for projects  requiring EPA permits.  Although  originally
Intended only  for energy  development  projects, the program now extends to  other
major development projects as well.

ACCELERATED REVIEW AND PERMITTING

1981 Accomplishments

     In 1981,  its  first  year,  this program obligated $585,900 of  which $524,800
was for Salaries  and Expenses  and $61,100 was for  Abatement,  Control and Com-
pliance.  In  addition to  establishing the program,  activities  included  accel-
erating permit  issuance  for  25  major  development  projects,   preparing  four
environmental  impact  statements,  and expediting the  review  process of 30  other
EISs.

1982ExplanationofChanges from January Budget Estimate

                  January        March           Current
                 Estimate       Estimate        Estimate

                55.151,600     $5,162,100      $4,949,200

     The net  decrease of  -5202,400  results   from  several   actions as  follows:

         January - March.  (+$10,500)  This change represented an increase of
     $10,500 from the January budget, all of which was for Salaries and Expenses.
     This increase  helped to defray  the cost of  required printing  of  notices of
     intent and  notices  of  filing for environmental impact  statements 1n  the
     Federal Register.

         Reprpgrammlnfl.  (-$96,400)  During the development of the operating plan,
     several mlseellaneous reprogrammings,  which  are  not  reportable to Congress,
     were made  to this  activity  and  resulted in a net decrease of  -$96,400.
                                        1-24

-------
         Congressipnal Actions.  (-5120,500)   A reduction of -51,413,800 was taken
     against the  March  estimate reflecting  the September  12%  reduction to  the
     Abatement, Control and Compliance appropriation.  The  Congress  subsequently
     restored the +$1,413,800  In final  action on  our  1982 Appropriation  Bill.
     A reduction of -$120,500 was applied to  the Salaries and Expenses appropria-
     tion to meet Congressional ly mandated appropriation  levels.

         Transfer Authority.  (+$4,000)  The  net Increase applied to  this activity
     includes an Increaseof +$4,000 to Salaries and Expenses.

1982 Program

     In 1982 the  Agency 1s allocating a  total  of $4,949,200 and  32.5  permanent
workyears to this program,  of  which $1,601,200 1s for the  Salaries  and Expenses
appropriation and $3,348,000  is  for  extramural  purposes  under the  Abatement,
Control and  Compliance  appropriation.   This  1s  only the program's  second  year,
and Its  first  of full-scale activity.   The  resources provided  reflect  this  and
are Intended to support major  Initiatives  on energy  and  other Important develop-
ment projects.    Expected  activities Include  acting  as  a  cooperating  agency  1n
preparing 27 EISs, accelerating  permit Issuance for 75  development  projects  and
expediting the review process of 65 other EISs.

1983 ProgramRequest

     The Agency requests a  total  of $3,405,400 and  30.6 permanent workyears  for
this program, of  which  $1,805,400  is  for the Salaries and Expenses appropriation
and SI,600,000  1s  for extramural  purposes   under  the  Abatement,  Control  and
Compliance appropriation.    This  1s  an  Increase  of  $204,200  for  Salaries  and
Expenses and a  decrease of $1,748,000  for  Abatement,  Control  and  Compliance.
The decrease  reflects  emphasis  on  high-priority  EISs,   while  reducing  the
Agency's role 1n those of a lower priority.  It 1s expected that EPA  will  prepare
or act as  a cooperating Agency in  the  preparation of  15  EISs, accelerate  the
permit issuance of 70 major development projects, and expedite the review process
of 60 other EISs.
                                        1-2.5

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                           INTERDISCIPLINARY

                                                 Enforcement Policy « Technical Support
                                                      ACTUAL
                                                       1981
                                               JANUARY
                                               ESTIMATE
                                                 1982
                        MARCH
                       ESTIMATE
                         1982
            CURRENT
            ESTIMATE
              1982
ESTIMATE INCREASE +
  1983   DECREASE -
        1983 VS 1982
                 PROGRAM
                                                               (DOLLARS IN THOUSANDS)
i
to
OS
Technical Support
Office of Legal 8
Enforcement Counsel
 Salaries & Expenses
 Abatement Control «
 Compliance

Enforcement Policy &
Operations
 Salaries & Expenses
 Abatement Control &
 Compliance
                                                    $3,714.2 /
                                                       $48.7
                      $3,639.6   $3,492.4   $3,241.0   -$251.4
                         $50.0      $50.0      $40.0    -$10.0
                                                                                                $6,864.0  $6,864,0
                                                                                                  $200.0    $200.0
                 TOTAL:
                  Salaries & Expenses
                  Abatement Control 4
                  Compliance

                 Enforcement Policy &
                 Technical Support
                        TOTAL
                                   $3,714.2
                                      $48.7
$3,762.9
                      $3,639.6   $3,492.4  $10,105.0  $6,612.6
                         $50.0      $50.0     $240.0    $190.0
$3,€89.6   $3,542.4  $10,345.0  $6,802.6

-------
                                          INTERDISCIPLINARY

                                Enforcement Policy 8 Technical Support

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME HORKYEARS
Technical Support
Office of Legal S
Enforcement Counsel

Enforcement Policy 4
Operations

TOTAL PERMANENT HORKYEARS
77.4
77.4
72.B       68.3       65.2      -3.1
                                           152.6     1S2.6
72.8       68.3      217.8     149.S
TOTAL WORKYEARS
Technical Support
Office of Legal &
Enforcement Counsel

Enforcement Policy I
Operations

TOTAL HORKYEARS
90.8
90.8
91.0       85.4       79.8      -5.6
                                           167.6     167.6
91.0       85.4      247.4     162.0

-------
                                INTERDISCIPLINARY

                     Enforcement Policy and Technical  Support

Budget Request

     The Agency requests a total of $10,345,000 and 217.8 permanent workyears  for
1983.  Included 1n this total 1s $10,105,000 for Salaries and Expenses and $240,000
for Abatement,  Control and  Compliance.   This Increase of $6,612,600 1n Salaries
and Expenses  and  $190,000  1n  Abatement,  Control  and  Compliance  reflects  the
formation of  the  new Office of Legal and Enforcement Counsel.  This subactlvlty
consists of the legal  aspects of the Agency's enforcement efforts  and the activi-
ties 1n support of enforcement  performed by the National  Enforcement Investigation
Center (NEIC).

Program Description

     Enforcement Policy and Operations— This subactlvlty  comprises  the  legal
aspects of an  Agency enforcement  programs  regardless of media (with the  excep-
tion of Superfund).  It is  responsible  for providing  legal  direction and support
to the enforcement of the  Clean A1r Act;  the Clean Water Act; the Toxic Substances
Control Act; the Resource Conservation and Recovery Act;  the Safe Drinking  Water
Act; and the Federal  Insecticide, Fungicide,  and Rodentidde Act.

     This subactlvlty  1s  comprised of Headquarters and Regional  personnel.   The
requested resources provide for  the development  of legal enforcement policy  and
procedures to  direct the  legal  enforcement activities  of  the Agency  Including
the Initiation  and  conduct  of civil/criminal litigation  as appropriate.  Full
legal enforcement  support services are provided to media compliance programs  in
accordance with specific  media priorities and compliance monitoring activities.

     The legal resources of  this subactlvlty coordinate their efforts with General
and Regional Counsel  staff attorneys to assure consistent interpretation and appli-
cation of the  law.  Litigation activities are conducted in  cooperation  with  the
Department of Justice.  Technical support is  provided  by the National Enforcement
Investigations Center in Denver, Colorado and individual  media  and regional  offices.
States are encouraged to resolve compliance problems whenever possible with Agency
assistance as appropriate.

     The Agency enforcement strategy  1s  results-oriented;  and  environmentally
significant violations  are to be  pursued  vigorously 1n  a certain, timely, predict-
able and fair manner.   Health  and  safety  related  violations  will  continue to  re-
ceive overriding priority  attention.

     Environmental problems  resulting from Improper waste disposal practices will
be of high priority and appropriate statutes  and sanctions will  be brought to pear
to resolve non-compliance  problems  1n the most  effective way. For all media, pro-
blems of initial  and/or continuing non-compliance by  major  sources will  be add-
ressed with  appropriate  legal   enforcement  responses.   Criminal  sanctions will
be considered  for  the  most significant  and  Indefensible forms of environmental
misconduct.

     Technical Support - Office of Legal  and Enforcement Counsel -- This program
element includes the planning, development, and provision  of technical  evidence,
Information, and  Interpretations  for civil  and  criminal  case preparations  in-
volving generation, transport, and disposal  of toxic  and hazardous waste  as  re-
lated to the Resource  Conservation  and  Recovery Act  (RCRA) and the Toxic Sub-
stances Control Act (TSCA);  compliance  requirements  as  related  to the  National
Pollutant Discharge Elimination System (NPDES) and  other  water pollution control
legislation; existing source,  new  source, and hazardous  emissions standards  as
                                        1-28

-------
related to  the  Clean Air  Act;  pesticide  enforcement  and regulatory  procedures
related to the  Federal  Insecticide, Fungicide  and  Rodentlcide Act  (FIFRA);  and
regulatory aspects of  other environmental legislation  and executive orders,  as
well as appropriate provisions of Title 18 of the U.S.  Code.

     This program provides Headquarters and Regional  Administrators with national
expertise, not normally available on their staffs, 1n evaluating a broad range of
waste, discharge,  disposal,  and  emission  problems,   Including  process  control
problems.

ENFORCEMENT POLICY AND OPERATIONS

1981 Acotnpl i shments

     This 1s a new program element in 1983. In 1981, the legal aspects of enforce-
ment are Included In  the appropriate media sections.

1982 Program

     This 1s a new program element in 1983. In 1982, the legal aspects of enforce-
ment are Included In  the appropriate media sections.

1983ProgramMRequejt

     The Agency  requests a total  of $7,064,000  and 152.6  permanent workyears  for
this program of which $6,864,000  1s for the Salaries  and Expenses appropriation
and $200,000 1s  for  the Abatement,  Control  and  Compliance  appropriation.   This
1s the first year of  funding for this new program element.

     In 1983, efforts will  continue to Improve the overall quality and timeliness
of Agency legal  activities  1n response to problems of non-compliance.  Management
systems will foster accountability  and  consistency of Agency enforcement actions
throughout the country.   A prime  management  goal  is  to assure  prompt  resolution
of Identified cases  of  non-compliance.   Policies and procedures  will  be revised
as necessary to achieve  this  goal  and to assure  certainty and  predictability of
Agency enforcement responses.  An automated docket and  case  tracking system will
be used to help  manage the  enforcement processes of the Agency to avoid a backlog
of enforcement  actions.   Also, a  regular audit  program  will  be Introduced  to
periodically audit the completeness  and quality of Agency evidence  and document
control procedures necessary  to  support allegations  in proposed   complaints.

     The legal resources requested for 1983 are  needed to  help select appropriate
enforcement responses to Instances  of  non-compliance that are  identified  1n
various State, local  and  source  reports, Inspections and  complaints.   Likewise,
legal personnel  will  Initiate and provide trial  counsel  for all  administrative
hearings under the various  statutes.  Throughout the enforcement  process,  legal
personnel will participate 1n or lead negotiations with sources  to assure resolu-
tion of compliance problems  that  Is consistent with statutory  requirements  and
national enforcement  policy.   Resources  also provide for  the legal review of and
concurrence on  all  administrative  notices and enforcement  orders  and proposed
administrative penalties.  Resources provide  for  the development,  initiation  and
conduct of civil and  criminal  litigation for all media.

TECHNICAL SUPPORT— OFFICE  OF LEGAL AMD ENFORCEMENT COUNSEL

1981Accomplishments

     In 1981, the Agency obligated 53,762,900 for this activity, all  of which was
for Salaries and  Expenses.   Activities during  the year focused on  provision  of
specialized technical   support to  the  various  media  enforcement offices.   The
NEIC provided analytical and  evidentiary support and assistance to EPAs enforce-
ment and litigation efforts.
                                        1-29

-------
1982 Explanation of Changes from January Budget Estimate
         .      . .  .                  ....

                  January        March           Current
                 Estimate       Estimate        Estimate

                              $3,689.600       $3.542,400

     The net Increase  of +$3,542,400 results  from  several  actions, as  follows:

         Restructuring.  (+$3,689,6001  These  resources  are  being consolidated to
     form the new program element Technical Support-Office  of  Legal  and  Enforcer-
     ment Counsel,  for  the  National  Enforcement  Investigations  Center,  NEIC.
     These resources will provide technical expertise and a  point of coordination
     for complex Investigations, development of technical  evidence, technical  ex-
     pertise to Headquarters  and Regions,  adequacy  and  validity of  scientific
     and technical evidence.  The Interdisciplinary  nature of technical activities,
     makes 1t necessary to consolidate these resources within one program  activity
     1n the Interdisciplinary media.

         Reprogrammlng.  (-$100,000)  During the development of the operating  plan,
     several mi seel laneous reprogramnrtngs, which are not  reportable  to Congress,
     were made  to  this  activity and  resulted  In a net  decrease of  -$100,000.

         Congressional Actions.  (-$385,200)  An additional  reduction of  -$385,200
     was appfild to the salaries and  Expenses  appropriation to meet  the  Congres-
     sional 1y mandated appropriation levels.

     -   TransferAuthority.  (+$338,000)  The net Increase  applied to this activ-
     ity includesanincrease of +$338,000 to  Salaries and Expenses.

1982 Program

     In 1982, the Agency 1s allocating  a total of $3,542,400  and 68.3 permanent
workyears to this program,  of  which $3,492,400 1s  for Salaries  and  Expenses  and
$50,000 is  for extramural  purposes under  the  Abatement,  Control  and  Compliance
appropriation.  This-is a new  budget  subactivity for 1982.  The primary  focus of
this program  In 1982  1s the  provision  of specialized  technical assistance to
Headquarters and regional judicial  case  preparation  activities.

     NEIC will provide assistance to the air programs in case preparation activi-
ties and technical  support to  enforcement actions  in  such areas as  compliance
testing and testing for respirable particulates 1n violation of National  Emission
Standards for Hazardous Air Pollutants (NESHAP).

     Assistance to the water program Includes such functions as compliance evalu-
ations and performance audit inspections,  Bulti-media Inspections, and technical
support and case preparation in major national  cases against municipal  and indus-
trial sources.  It  Includes assisting States  and Regions In  the  preparation of

NPDES permits  for complex  industrial  facilities  on a  case-by-case  basis  and
providing technical  support and expert testimony for evidentiary permit hearings.

     NEIC will provide  Investigative  and analytical  capability  for  RCRA  Section
7003 and radiological  hazardous waste  evaluations  and  case preparations. This
Includes such activities as technical  evaluation, case preparation, and litigation
support.  It  will  assist Regions,  States  and localities In  the  preparation of
RCRA permits. Investigations, and training.

     NEIC will  assist Headquarters  1n the  Implementation of  State  programs  for
toxic substances  control  and  audit  of toxic  substances  contract  laboratories
engaged 1n pre-manufacturing notification (PMN) work.
                                        1-30

-------
1983 Program Request

     The Agency requests a  total  of  $3,281,000 and 65,2 permanent workyears  for
this program, of which $3,241,000 1s  for the  Salaries  and  Expenses appropriation
and $40,000 1s for the Abatement, Control  and Compliance appropriation.   This 1s
a decrease of $251,400 in Salaries and Expenses and $10,000 in  Abatement,  Control
and Compliance.   Assistance  to  state  enforcement personnel  will  decrease  in
such areas as Inspections,  audits, and case preparations  as resources  are  focused
on cases  involving  major  sources and  nationally  significant issues.   Primary
emphasis will be placed  on Federal  judicial case  preparation  Involving national
issues and/or significant Regional  concerns.

     In the  air  media,  case  preparation  activities  and  technical   support  to
enforcement actions will  be continued.  NEIC will develop sample permits prescrib-
ing Best Available Control  Technology (BACT) limits, develop emissions monitoring
protocols and  requirements,   and  continue  compliance testing and  testing  for
respirable participates 1n  violation  of National  Emission Standards for Hazardous
Air Pollutants (NESHAP).

     Me will continue at approximately  the  1982  level:   water  program compliance
evaluations; performance audit  inspections;  multimedia  Inspections;   evaluations
of remaining major publicly owned treatment writs (POTWsl suspected of noncompH-
ance; and  continuing  technical  support  and case  preparation  1n  major national
cases against municipal  and Industrial  sources.  Some  assistance will  be provided
to States and Regions In the preparation of MPOES  permits  for  complex industrial
facilities on  a  case-by-case  basis.   Other  permit limits will  be   coordinated
with RCRA permits to achieve effective control  of toxic and hazardous  substances.
It 1s expected that substantial  resources will  be necessary for technical  support
and expert testimony for evidentiary  permit hearings.


     Investigative and analytical  capability  for  RCRA  Section 7003  and  radio-
logical hazardous  waste  evaluations  and case  preparations will  be  continued.
This support  will   Include technical  evaluation,   case  preparation,  litigation
support including testimony  by  participants,   negotiation or  participation  1n
negotiations of  consent  decrees,  and  evidence audit  and  quality assurance  and
case follow-up functions.  NEIC will  respond  to Agency and some  State and local
requests for technical assistance in preparation of RCRA permits,  Investigations
of transporter compliance,  and training.

     NEIC will continue  to  assist  in  pesticide  field  investigations, evidence
gathering, case  preparations,  use observations,  overview   monitoring for  FIFRA
Section 18 exemptions, and some technical  assistance and  training  of  State pesti-
cide inspectors.    Some  participating  pesticide  laboratories  will   be   audited
and analytical methods developed in high priority situations.

     Emphasis will   also  be  directed toward  assistance  to  Headquarters  in  the
implementation of  State programs  for  toxic  substances  control   and  audit  of
toxic substances  contract  laboratories  engaged in premanufacturing  notification
(PMN) wort.  Technical and analytical support will  continue for case  development,
quality assurance, evidence  audit,  emergency  response,  and criminal  investiga-
tions, as  well  as  developing TSCA procedures   for  inclusion  in   multi-media
inspection doctrines.                         '
                                        1-31

-------
Toxic Substances
       SECTION TAB

-------
Page Intentionally Blank

-------
TOXIC SUBSTANCES
ACTUAL
1981
JANUARY
ESTIMATE
1982
(DOLLARS
APPROPRIATION
Salaries 8 Expenses
Abatement Control 8
Compliance
Research 8 Development
TOTAL, Toxic Substances
PERMANENT FULL-TIME HORKYEARS
TOTAL HORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
PROGRAM HIGHLIGHTS
Chemical Testing 8
Assessment Non-Energy
Salaries A Expenses
Research 8 Development
Monitoring &
Technology Support
Research 8 Development
Salaries 8 Expenses
Research 8 Development
RESEARCH 8 DEVELOPMENT TOTAL
$31
$42
$19
$94
$97
$36
$10
$19

$10
$19
$30
,973.8
,177.5
,952.5
,103.8
690.7
838.3
,146.6
,895.0
,345.7
,702.5
$250,0
,345.7
,952.5
,298,2
$41,400
$41,887
$24,353
$107,640
796
912
$68,394
$58,646
$14,420
$24,353

$14,420
$24,353
$38,773
.1
.1
.5
.7
.7
.7
.0
,0
.1
.5

.1
.5
.6
MARCH
ESTIMATE
1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
IN THOUSANDS)
$36
$37
$23
$97
$63
$58
$14
$23

$14
$23
$38
,790.5
,349.2
.676.6
,816.3
731.7
836.8
,500.0
,646.0
,331.0
,676.6

,331.0
,676.6
,007.6
$35,
$24,
$16,
$77,
$88,
$58,
$14,
$16,

$14,
$16,
$31,
703.4
735.3
939.1
377.8-
686.5
783.7
528.4
646.0
236.8
939.1

236.8
939.1
175.9
$33,852
$22,603
$12,148
$68,604
607
687
$80,130
$62,000
$14,500
$12,148

$14,500
$12,148
$26,648
.3
.0
.7
.0
.7
.7
.3
.0
.1
.7

.1
.7
.8
-$1,851.1
-$2,132.3
-$4,790.4
-$8,773.8
-78.8
-96.0
-$8,398.1
$3,354.0
$263.3
-$4,790.4

$263.3
-$4,790.4
-$4,527.1

-------
         TOXIC SUBSTANCES
ACTUAL    JANUAWf     MARCH     CURRENT   ESTIMATE  INCREASE +
 1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE -
            1982       1982       1982            1983 VS 1982
Toxic Substances
Strategies
Salaries A Expenses
Abatement Control 4
Compl 1 ance
Salaries A Expenses
Abatement Control A
Compl 1 ance
ABATEMENT « CONTROL TOTAL
Toxic Substances
Enforcement
Salaries 4 Expenses
Abatement Control i
Compl 1 ance
Salaries S Expenses
Abatement Control 4
Compliance
ENFORCEMENT TOTAL
TOTAL PERMANENT WORK YEARS
Toxic Chemicals
Testing 1 Assessment
RESEARCH 4 DEVELOPMENT TOTAL
(DOLLARS

$19
$39

$19
$39

$58


$2
$2

$2
$2

$5





,177.9
,594.9

,177.9
,594,9

,772.8


,450.2
,568.6

,450.2
,568.6

,018.8

170.4

170.4

$22,948.
$40,352.

$22,948.
$40,352.

$63,300.


$4,032.
$1,534.

$4,032.
$1,534.

$5,566.

174.

174.

0
7

0
7

7


0
4

0
4

4

4

4
IN THOUSANDS)

$19,241.
$35,814.

$19,241.
$35,814.

$55,056.


$3,218.
$1,534.

$3,218.
$1,534.

$4,752.

174.

174.

5
8

5
8

3


0
4

0
4

4

4

4

$18
$23

$18
$23

$41


$3
$1

$3
$1

$4





,177.2
,537.7

,177.2
,537.7

,714.9


,289.4
,197.6

,289.4
,197.6

,487.0

169.4

169.4

$16.926.
$22,396.

$16,926.
$22,396.

$39,322.


$2,425.
$207.

$2,425.
$207.

$2,632.

153.

153.

3
0

3
0

3


9
0

9
0

9

5

5

-$1,250.9
-$1,141.7

-$1,250.9
-$1,141.7

-$2,392.6


-$863.5
-$990.6

-$863.5
-$990.6

-$1,854.1

-15.9

-15.9

-------
TOXIC SUBSTANCES

Toxic Substances
Strategies
ABATEMENT S CONTROL TOTAL
Toxic Substances
Enforcement
ENFORCEMENT TOTAL
TOTAL HDRKYEARS
Toxic Chemicals
Testing 4 Assessment
RESEARCH A DEVELOPMENT TOTAL
Toxic Substances
Strategies
ABATEMENT & CONTROL TOTAL
Toxic Substances
Enforcement
ENFORCEMENT TOTAL
ACTUAL
1981
456.6
456,6
63.7
63.7
210.7
210.7
546.0
546.0
81.6
81.6
JANUARY
ESTIMATE
• 1982
511.1
511.1
111.2
111.2
212.6
212.6
580.2
580.2
119.9
119.9
MARCH
ESTIMATE
1982
464.6
464.6
92.7
92.7
212.6
212.6
524.2
524.2
100.0
100.0
CURRENT
ESTIMATE
1982
428.6
428.6
88.5
88.5
203.4
203.4
484.8
484.8
95. S
95.5
ESTIMATE INCREASE +
1983 DECREASE -
1983 V-S 1982
390.3
390.3
63.9
63.9
185. 7
185.7
437.4
437.4
64.6
64.6
-38.3
-38,3
-24.6
-24.6
-17.7
-17.7
-47.4
-47.4
-30.9
-30.9

-------
                               TOXIC SUBSTANCES


OVERVIEW AND STRATEGY

     Under the Toxic Substances Control  Act  (TSCA),  EPA has authority to require
testing of commercial  chemicals;  evaluate the health and environmental  risks  of
new chemicals  before  they  are manufactured;  regulate  both  new  chemicals  and
those already in  commerce  if they are found  to  cause unreasonable risk;  obtain
use, exposure,  and  other  data  from  chemical   companies;  and  conduct  related
activities.  EPA's  jurisdiction   under  TSCA  includes  all  commercial  chemicals
except foods,  food additives, drugs,  cosmetics, pesticides,  and  certain  other
special categories.  Some  55,000  chemicals are listed in the  Agency's inventory
of chemicals subject to TSCA.  EPA is  receiving  notices of manufacturers'  intent
to produce new chemicals at  a rate of about 800 per year.   To handle this  work-
load, the regulatory program  Is supported  by  strong  research and development and
enforcement operations.

     The Agency's  major goal  under  TSCA is  to protect  human health and  the
environment from  unreasonable  risks  posed by  chemicals.   EPA's objective  is  to
encourage the  chemical  Industry  and  chemical  users  to  evaluate  and  handle
chemicals in such  a  way  that they will not present  unreasonable risks to  health
or the environment.  To  the  extent that  chemical  producers and users  take  such
action voluntarily, the need  for regulatory action 1s reduced; where this approach
will not work, regulatory action 1s taken.

     EPA's review  of  new  chemical  notices before  manufacture 1s   one  of  the
principal functions  of the TSCA  program.   TSCA requires  that  such  notices  be
submitted at least 90 days before a manufacturer begins  producing a new chemical.
Agency review Is  designed to  determine  whether or not the  chemical will pose  an
unreasonable risk.   Depending upon  the  evaluation  of the  chemical,  EPA  can
prohibit or restrict manufacture, defer manufacture  until  additional  information
1s provided, allow manufacture for  certain uses but  require additional  notice
for others, or take  no  action and allow manufacture.  In cases  where the  Agency
considers taking specific action,  such as prohibiting or restricting manufacture,
the manufacturer  1s  requested to  supplement  the data  originally  submitted.   A
final decision is  made only  after  the manufacturer  1s consulted  regarding  the
manufacturing process,  potential  uses,  and feasible  measures to control  risks.
In these  cases,   manufacturers  generally  cooperate  on a  voluntary basis  and
supply additional  information,  or  withdraw  .the   chemical  completely.   In  a
significant number of  cases, Agency  review  Indicates no cause  for  concern  and
the chemical  enters manufacture on schedule.

     The TSCA testing  program requires  affected industries to  develop  new data
needed to assess  the health  and/or  environmental risks  of  commercial  chemicals.
A great  many  chemicals already  1n  commercial  use,  Including many high-volume,
widely used  chemicals, have  not  been adequately tested  for  potential  hazards.
Thus far, candidates for  testing  have come exclusively from  the recommendations
of the Interagency Testing Committee established under TSCA.  EPA 1s Increasingly
trying to work out agreements for voluntary testing  by chemical companies  as  an
alternative to  requiring  testing  by  rule.  These  agreements reduce industry's
regulatory burden  and  use  its professional expertise to evolve  innovative  means
of generating the  data needed  for assessing  risks as  accurately as  possible.

     TSCA also  authorizes  the Agency to  regulate  the  manufacture,  processing,
distribution, use,  and disposal  of  chemicals  already  in   commerce  which  pose
an unreasonable  risk.   The  Agency's  first step  1n  dealing  with these  chemicals
was to develop  processes  for  obtaining  information on the  kinds  of  chemicals
being produced  and  used.   This  phase  is  essentially complete,  enabling  the
program to  proceed  toward  the task  of  evaluating  the  very large  amount  of
information obtained to date  1n  order to  set  priorities  for review  of existing
chemicals.  In addition to  these evaluations, recommendations from the  Interagency
Testing Committee  form an  important basis for the priority-setting process.   As
                                      TS-4

-------
the priorities  are determined,  efforts are  concentrated  on  evaluating  present
and potential human or  environmental  exposures to the chemicals of  most  concern
and the  potential  hazards  that may  be  associated  with  those exposures.   The
resulting analyses, along  with  complementary data such as  that on  manufactur-
ing and  economic  factors,  lay  the  groundwork  for  decisions  about using  TSCA
authority or  other statutes to  reduce  or minimize identified hazards  by devel-
oping negotiated agreements or rules.

     TSCA also  authorizes  the development of recordkeeping  and reporting  rules
for systematically  obtaining  chemical   data  from industries  and  for  keeping
records on  the  identities  and quantities  of chemicals being  produced  and  used,
as well   as  their  by-products.  For  selected chemicals,  data  are  gathered  on
such factors  as  health and  environmental  effects,   exposure to  workers,  and
manner of disposal.   This  program also  implements  the TSCA requirement  that
chemical manufacturers,  distributors,  and processors  inform the Agency  immedi-
ately if  a  chemical  presents a  substantial  risk  of Injury  to  health  and  the
environment.

     Toxic  substances enforcement  activities are directed toward promoting  com-
pliance with  TSCA  regulations, particularly  those  Intended  to prevent or  abate
threats to  public  health or the environment.   These activities include monitoring
compliance with  existing  rules to insure  that  regulated chemicals  are manufac-
tured, handled,  and used in accordance  with  the  law; assuring  that new chemicals
enter production only after the  Agency  has reviewed their  potential  toxicity  and
exposure; and  assuring  that  industry,  within the agreed upon time period,  is
generating the  accurate, reliable  data  needed  to  make  regulatory  judgments.
Increasing effort  is  being  devoted  to  fostering voluntary   compliance  through
compliance assistance to the chemical  industry.

     The toxic  substances research and  development program Is  closely  linked to
the toxic substances  regulatory program.  The  research  program provides scien-
tific tools for  use in the massive task  of choosing which  existing and  new  chem-
icals require testing and control.   The objective of the research program  1s to
develop cost-effective  and  scientifically accurate  models,  tests,  and  methods
so that the Agency can (1)  select and concentrate on  those  chemicals  which really
pose unreasonable  risk;  (2)  pinpoint data requirements  for  health and environ-
mental effects,  so that Industry  will   not  be  required  to  perform  unwarranted
expensive testing; and (3)  streamline the chemical  review process.

     In support  of the  new  chemical review process,  the  research  program  is
pursuing ways that the  regulatory program can  more  effectively evaluate  these
chemicals in  a  much  shorter  time  span.   For  instance,  the  research program  is
working on developing a structure/activity data  base for use 1n the  new chemical
review process.  The data will  assist  in  predicting  the potential  effects of a
chemical on which  there  is little or  no specific toxicological information.   The
predictions are based on the  similarity  of the chemical's  structure  and activity
to the  structure  and  activity  of chemicals on which  we do  have  information.

     Risk assessments of  chemicals have relied  on time-consuming, costly animal
testing.  The  Agency's  research effort  is  developing  less  costly,  and  more
efficient test methods (e.g. a screening test for potential carcinogenic effects;
this test  greatly improves  current  short-term  bioassays and  can  be  used  by
both industry and government agencies).

     The research  program  has expended  considerable  effort In  support  of  test
guidelines.  The  research  has  contributed  to   the  tiered testing  approach  to
limit test  requirements to   only  those tests  which  are  absolutely  necessary.
Use of these tests can  reduce the testing  cost to  Industry and the time required
to evaluate chemicals.

     The research  program 1s developing  an integrated data  base and  Is performing
research to determine  chemical  fate,  transport  and transformation.   This Infor-
mation aides  in  assessing the potential   hazards  or toxic effects of  chemicals in
the environment.
                                      TS-5

-------
     These research  tools  enable  the  toxic  substances program  to make  better
decisions on what to  control  and  how much to control.  They provide more  scien-
tifically credible and legally defensible methods to quantify health and environ-
mental risk, so  that the Agency  will  be better  able to determine the  adequate
margin of safety for its control actions.   The Agency's objective is to synchronize
the minimum level of  control  with  the maximum level  of  environmental  protection.

     The toxics  Integration  activity contributes  to the Agency's  objective  of
reducing regulatory burdens by ensuring  that EPA programs dealing  with  chemical
problems are consistent  in  their policies  and procedures  and  take  action  in
a coordinated  manner when  they  are  regulating  chemical  producers  and  users-
Toxics integration  activity  includes  efforts to promote international  agreement
on toxic  substances  testing  and  control  activities  and  to  make  public  and
private access easier to  non-confidential data on chemical  substances.

     The toxic  substances  strategy is designed to  develop  regulatory  and  non-
regulatory approaches that provide  strong continuing incentives  for  the private
sector to achieve the TSCA goals of protecting public health  and the environment.
One key element  In  this  strategy  is  issuing  exemptions from the Premanufacture
Notification requirement, so that the manufacture of classes of chemicals  posing
no significant risk will  not be  delayed by premanufacture review.  Another  key
element Is encouragement  of voluntary testing by chemical companies.   In addition,
the program 1s  shifting  from the  issuance of more  rigid test  standards to  more
flexible test  guidelines.   This  shift  will  foster Industry innovation in  the
development of less burdensome,  less  costly  tests  that  achieve  scientifically
sound results.   The reporting and  recordkeeping function  will   continue  to  focus
on specific chemicals.   Efforts  will be  made   to  integrate  TSCA data  gathering
requirements with other  such  EPA  activities on potentially hazardous  chemicals
to conserve  Industry resources.   The  result  of  these  activities  will  tie  a
reduction in Industry's  regulatory  burden  and an  improved  environmental  pro-
tection effort.
                                      TS-6

-------
                              TOXIC SUBSTANCES


SUMMARY. OF INCREASES AND DECREASES

                                                       (In thousands of dollars)

     1982 Toxic Substances Program		         $77,377.8

        Salaries and Expenses	          -1,851,1

        The net  decrease of  78,8  permanent  workyears
        reflects completion of test guidelines develop-
        ment for many  major health,  and environmental
        effects, shifts  of  emphasis  to  less  resource
        intensive voluntary controls for existing chem-
        icals and  shift  of  some  enforcement  responsi-
        bilities to  Office   of Legal  and  Enforcement
        Counsel.

        Research and Development	          -4,790.4

        The decrease reflects  the  completion  of  much
        of the  research  needed to  develop  test  guide-
        lines.  Also reduced is funding for the National
        Center for Toxicological  Research for long-term
        research which is no longer  needed to  support
        the implementation of the Toxic Substances Con-
        trol  Act.

        Abatement,  Control and Compliance	          -2,132.3

        The decrease  in  extramural  support  reflects
        reductions in development,  enhancement and ex-
        pansion of information systems, discontinuation
        of contractor support to the Industry Assistance
        Office and completion  of  the  toxic  substances
        enforcement grant program.

     1983 Toxic Substances Program	         $68,604.0


SUMMARY OF CHANGES TO JANUARY 1982 BUDGETESTIMATE

                                                       (in thousands of dollars)
     January 1982 Estimate	,.,	         $107,640.7

        Ja nua ry-Ma rch	           -9,487.9

        Reorganization.	             -336.5

        Reprogrammings......,	             -124.8

        Congressional Actions	          -19,860.2

        A decrease of  $9,659,200  to  Abatement,  Control
        and Compliance and a  decrease  of $3,614,300 to
        Research and Development was taken  against the
        March estimate  to  reflect  the  September  12%
        reduction.  An additional  reduction of
        $6,586,700 was  applied  to  the  Salaries  and
                                       TS-7

-------
                                                  (in thousands of dollars)
   Expenses ($3,453,900),  Research  and  Develop-
   ment ($228,800),  and  Abatement,  Control  and
   Compliance ($2,904,000) appropriations to
   meet Congressional ly mandated appropriation
   levels.

   Transfer Authority	            -453.5

   A net decrease of $453,500 was transferred from
   this program as  follows:  $2,327,700 was trans-
   ferred from Abatement,  Control  and Compliance;
   5608,700 was transferred  from Research  and De-
   velopment; and  $2,482,900  was   transferred  to
   Salaries and Expenses.

Current 1982 Estimate	         J77.377.8
                                  TS-8

-------
                               TOXIC SUBSTANCES
                                 Actual
ProgramActivities                1981

TESTING AND EVALUATION
  Testing Proqraii!--- Section 4
  Test Guidelines Published......   6
  Test Rules Proposed/
    Voluntary Agreements	   3
  Test Rules Final/
    Voluntary Agreements	.--   0

  Assessment of New Chemicals
  Notlces Prescreened............ 581
  Initial Review of PHNs	478
  Risk Assessments for Potential
    S 5(e)/5(f) Orders.	  26

  Assessment of Existing Chemicals
  Chemical Hazard Information"
    Prof11es	  37
  Preliminary Risk Assessment
    of Existing Chemicals........   4
  Risk Assessment Supporting
    Regs of Existing Chemicals...   1
  Substantial Risk Notices
    § 8(e) Reviewed....	  58

CHEMICAL CONTROL
  NewChemical Program — S5
  No. Of PMN Notices Processed..-. 581
  PMN Notices Withdrawn,
    Negotiated Agreements, or
    S 5(e)/5(f) Orders	  10
  No. of Valid Exemptions 5(h)(4)
    Applications Reviewed/
      Final Resolution	   0
  Test Market Exemptions.........  41
  No. of SNUR Rules Developed....   0

  Existing Chemical Program — § 6
  B6. if1 Prereplatory Analyses.,   6
  No. of Regulatory Analyses
    Supporting:
    Proposed Rules	   0
    Final Rules	   0
  Exemption Requests	   €
 Budget  Current
Estimate Estimate
  1982     1982
    69

    11  a/

     3 a/
   800
   500

    32
    55

     5

     5

    75



   800
     4
     2
    12
 30

  9

  3
800
560

 25
 35

  3

  0

 75



800
    24 b/    22
    10        5
    60       60
    12 C/     6
                  Increase +
       Estimate   Decrease -
         1983   1983 vs. 1982
  65

  14

  11
1000
 600

  40
  35

   1

   0

  75



1000


  23
           10
           60
            1
 +35

  +5

  +8
+200
 +40

 +15
  -2
+200


  +1


  +J5

  -5
                       -3
                       -2
                       +1
a/ The President's  budget submitted 1n March  1981  projected 78 proposed  and  10
~~  final Individual  chemicals.   This  category  has  been  changed  to  reflect
   Interagency Testing  Committee designations  which  may include  from 1  to  300
   individual chemicals.

b/ The  President's  budget submitted  in  March  1981  separately  identified  PMN
~  Notices Withdrawn and §5(e)/5(f) Orders.

c/ The  President's  budget submitted  In  March  projected 42  individual  chem-
~  Icals.  This  category  has  been  changed  to  reflect  the  number  of  rules
   being developed.  Each  rule may Include more than  one chemical.   In addition,
   this activity  is more appropriately  listed  in 'the new  chemical  program.
                                      TS-9

-------
                                         Budget  Current               Increase +
                                 Actual  Estimate  Estimate    Estimate   Decrease -
Program Activities                1981     1982      1982       1983   1983 vs. 1982

TSCA INFORMATION
  SectionTT
  Recordkeeping and Reporting
    Rules Proposed	    363           0          -3
  Recordkeeping and Reporting
    Rules Promulgated	,    232           3          +1
TOXICS INTEGRATION
  itate Cooperative Agreements
    Awarded Under Section 28	     3       0        0           0
  No. of Intermedia Priority
    Pollutant Documents
    Produced or Updated	    19      12       12           8           -4

TOXIC SUBSTANCES ENFORCEMENT
  Inspections Under Section 4
    GLP Inspections	     -     100      125          80         -45
    Lab Audits	     -      20       25          20           -5
    Test Rules Inspections	     -      25       30          29           -5
  Inspections Under Section 5.....    10     225      318        265         -53
  Inspections Under Section 6	  1079    1010     1095        875        -220
  Inspections Under Section 8....     5      68      125        100         -25
  Inspections Under Section 12...                     20          1.5           -5
  Inspections Under Section 13...     2     170      280        200         -30
                                      TS-10

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                           TOXIC SUBSTANCES

                               Chemical  Testing * Assessment Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE  +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE  -
                                                 1982       1982       1982            1983 VS 1982

                                              (DOLLARS IN THOUSANDS)
PROGRAM
Scientific Assessment
 Salaries ft Expenses

Technical Information
& Liaison
 Salaries & Expenses
 Research ft Development

Monitoring Systems ft
Quality Assurance
 Salaries ft Expenses
 Research ft Development

Health Effects
 Salaries ft Expenses
 Research ft Development

Environmental Engineering
ft Technology
 Salaries ft Expenses
 Research ft Development

Environmental
Processes & Effects
 Salaries ft Expenses
 Research 8 Development
$84.9
$92.9
$92.2
$92.2
$161.4
$69.2
$241
$17
$1 ,448
$1,017
$3,060
$5,396
$502
$798
$4,862
$6,658
.4
.3 J
.0
.2
.7
.3
.2
.1
.0
.3
$285
$17
$2 ,031
$2,731
$4,501
$7,414
$624
$1,152
$6,737
$7,623
.4
.3
.3
.9
.7
.1
.9
.5
.7
.4

$2
$2
$4
$7
$1
$6
$7
$285
$14
,015
,677
,466
,207
$620
,107
,706
,273
.4
.3
.3
.7
.1
.1
.4
.9
.7
.4
$251.3
$2,195.3
$3,312.8
$4,789.9
$5,698.1
$673,7
$965.9
$6,082.9
$4,373.0

$1
$3
$5
$3

$6
$3
$170
$21
,856
,611
,556
,455
$384
$142
,239
,189
.5
.9
.2
.8
.6
.6
.9
.7
.8
.1
-$80.8
$21.9
-$339.1
$299.0
$766.7
-$2,242.3
-$288.8
-$823.2
$156.9
-$1,183.9

-------
                                                             TOXIC SUBSTANCES

                                                 Chemical  Testing * Assessment Non-Energy

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981      ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                   1982       1982       1982            1983 VS 1982

                                                                (DOLLARS IN THOUSANDS)
in
i
r\>
Stratospheric
Modification
 Salaries * Expenses
 Research « Development

National Center For
lexicological Research
 Research 4 Development

TOTAL:
 Salaries * Expenses
 Research A Development

Chemical
Testing £ Assessment
Non-Energy
                                                       $146.5
                                                     $1,215.1
                        $146.2
                        $914.3
$144.9
$896.2
$151.5
$766.0
$130.7
$742.4
-$20.8
-$23.6
           $3,173.3   $4,500.0   $4,500.0   $1,823.3     $910.0   -$913.3


          $10,345.7  $14,420.1  $14,331.0  $14,236.8  $14,500.1    $263.3
        - $19,702.5  $24,353.5  $23,676.6  $16,939.1  $12,148.7 -$4,790.4

TOTAL     $30,048.2  $38,773.6  $38,007.6  $31,175.9  $26,648.8 -$4,527.1

-------
                                           TOXIC SUBSTANCES
                               Chemical  testing 4 Assessment Non-Energy

PEW1ANEHT FULL-TIME WORKYEARS
Scientific Assessment
Technical Information
& Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Engineering
8 Technology
Environmental
Processes A Effects
Stratospheric Modification
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Scientific Assessment
Technical Information
ACTUAL JANUARY
1981 ESTIMATE
1982
1.0 2.0
4.1 4.2
25.3 32.0
45.0 43.2
10.3 11.5
84.7 79.2
2.3
170.4 174.4
3.2 3.5
6.5 6.7
MARCH
ESTIMATE
1982
2.0
4.2
32.0
43.2
11.5
79.2
2.3
174.4
3.5
6.7
CURRENT
ESTIMATE
1982
1.8
4.2
29.2
43.2
11.5
77.2
2.3
169.4
3.3
6.7
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
2.5
1.1
23.2
49.1
5.3
70.5
1.8
153.5
4.0
2.3
.7
-3.1
-6.0
5.9
-6.2
-6.7
-.5
-15.9
.7
-4.4
& Liaison

-------
            TOXIC SUBSTANCES

Chemical Testing & Assessment Non-Energy

      ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
       1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                  1982       1982       1982            1983 VS 1982
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Engineering
& Technology
Environmental
Processes 8 Effects
Stratospheric Modification
TOTAL WORKYEARS
28.2

48.3
15.5

106.8

2.2
210.7
38.0

49.2
14.2

98.7

2.3
212.6
38.0

49.2
14.2

98.7

2.3
212.6
33.2

48.2
14.2

95.5

2.3
203.4
27.1

55.1
6.2

89.2

1.8
185.7
-6.1

«.9
-8.0

-6.3

-.5
-17.7

-------
                               TOXIC SUBSTANCES

                   Chemical Testing and Assessment Non-Energy

BudgetRequest

     The Agency requests  a total  of $26,648,800  and 153.5  permanent  workyears
for 1983,  a  decrease  of  $4,527,100 and 15.9  permanent  workyears  from  1982.
Included 1n this  total  is  $14,500,100 for Salaries  and  Expenses  and  $12,148,700
for Research  Development.   This  represents  an  increase of  $263,300  and  a  de-
crease of 15.9  permanents  workyears in  Salaries and Expenses and a decrease of
$4,790,400 In  Research and Development.   The  increase  reflects  the  Agency's
desire to improve the in-house scientific quality of our laboratories and Agency-
wide risk assessments  of  toxic  and hazardous chemicals.  The decrease  reflects
the Completion  of much of the  research  needed to implement test  guidelines under
Section 4 of  the  Toxic Substances  Control  Act  and  the  reduction of  funding to
the National  Center  for Toxicologies! Research for long-term research  which does
not directly  support the  implementation of  the Toxic  Substances  Control  Act.

ProgramDescri pti on

     The Chemical  Testing and  Assessment research  and development program is the
toxic substances research  program that  provides the Office  of Toxic  Substances
with the scientific  tools   to  Implement the Toxic  Substances Control  Act.   The
goal of  the  research  program  is  to develop  cost  effective tests,  predictive
models, and methods  which  (1) improve  the  Office  of Toxic Substances  ability
to quantify the risk  a  chemical   poses  to human  health  and  the  environment,
(2) hasten  the  chemical  evaluation  and review process  for new  and  existing
chemicals,  and  (3) reduce the  testing burden on Industry.  The  current  research
program now focuses  on: short-term  screening tests which predict the risk poten-
tial of  new  chemicals and  streamline  the   premanufacturing  notification  new
chemical  (and significant  new use)  review  process,  the most scientifically  ap-
propriate and low cost tests and methods  for test  guidelines  and  test  standards,
and analyses  to determine  which  manufacturing  and  engineering  processes  can
control the harmful  effects of  a  chemical.   In  1983, the Agency has  carefully
linked its toxic  substances research program  to the Office  of Toxic  Substances
needs and is  committed to improving  the Agency's  scientific accuracy  and  to
closing critical research  gaps.

SCIENTIFIC ASSESSMENT

1981 Accomplishments

     In 1981,  the Agency  used a total  of $84,900  for the  Scientific  Assessment
program,  all  of  which  was  under  the  Salaries   and  Expenses   appropriation.

     The Scientific  Assessment program  had  lead responsibility for the  Agency's
development of  a  uniform approach  to  risk  assessments.  The program  developed
draft Agency wide guidelines to  use in  performing  mutagenicity   risk  and  expo-
sure assessments.    These  draft   guidelines   improve the  scientific  and  legal
bases the Agency  uses to  defend its  risk  assessments  by establishing  uniform
procedures  and  methods.    The  program   also   directed  the  Program  Integration
Project's evaluation  of  Agency  scientific  assessments  and contributed to  an
evaluation  of the risk  assessment methodology  developed by the  Project  for  Its
integrated  Industry-by-lndustry  regulatory  approach.  Additionally, the  program
was involved  In efforts to  develop  interagency guidelines for risk  assessments.
                                       TS-15

-------
1982 Explanation of Changes froin January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                      $92,900         $92,200         $92,200

     The net decrease of -$700 results from the following action:

     -  January - March.   (-$700)   This change  represented a  decrease of  $700
        from the January  budget, all  of  which  was  for Salaries and  Expenses.

1962 Program

     In 1982  the Agency  is  allocating a  total  of  $92,200  and 1.8  permanent
work years to  this  program, all  of which  are  under  the  Salaries  and  Expenses
appropriation.

     In 1982,  the  Scientific  Assessment program is  continuing  its efforts  to
achieve uniform Agency risk assessments  so that the Agency is on  firm scientific
and legal ground.  Accordingly,  the program is (1)  completing  case  studies  that
test the  validity   of  the Program Integration  Project's  Industry-by-industry
risk assessment  approach;  (2)  completing  an  exposure  assessment  handbook  for
Agency use which explains  the  appropriate  exposure  techniques  used  to assess the
major types  of  environmental  problems;  and  (3) assisting the  various  Agency
programs In  documenting the  production, use,  and disposal  hazards  of  specific
chemicals.

1963 Program Request

     The Agency requests a total  of $236,400 and 2.5 permanent  workyears for  this
program of which $161,400 is  for  the  Salaries  and  Expenses   appropriation  and
$75,000 is for the Research and  Development appropriation.   This  reflects  an 1n*
crease of $69,200 in the  Salaries  and Expenses appropriation and $75,000  1n the
Research and Development appropriation.   The increase matches the Agency's greater
concern for  uniform  and consistent  methodologies that  can  be used  Agency wide.

     In 1983, the Scientific Assessment program will  Improve the  scientific  qua-
lity of Agency assessments by developing more accurate and cost-effective assess-
ment methodologies  for  use by program  offices.   The program will:  (1)  Identify
more scientifically advanced methods for the Office of Toxic Substances and the
other media  regulatory  programs; (2) identify  more scientifically  accurate and
less costly methods for these  programs  to use; and, (3) based  on the results  of
its 1982  case studies  of   the  Program Integration Project's  Industry-by-industry
risk assessment approach,   the  Scientific Assessment program will participate  1n
the efforts to modify the  risk assessment methodology.

TECHNICAL INFORMATION AMD  LIAISOH

     Refer to  the  Oxidants  Non-Energy  narrative  for  a description  of those
Technical Information and  Liaison  activities  that  are common to  all  research
and development  budget  sub-activities.   Activities  specific  to   this  budget
sub-activity are indicated In  the program element description below.

1981 Accomplishments

     In 1981, the Agency  used  a total  of $258,700  for  the Technical  Information
and Liaison  program,  of  which  $241,400  was  under  the  Salaries  and  Expenses
appropriation and $17,300  was  for extramural  purposes under  the  Research  and
Development appropriation.
                                       TS-16

-------
      in  1981 the Technical Information and Liaison program produced the following
technical information products:

      -   Potential  Atmospheric  Carcinogens:   Phase  2  Analytical  Methodology.

      -   Maintenance of the Organic Chemical Producers Data Base.

1982  Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                     $307,700        $299,700        $251,300

      The net  decrease of -$51,400  results from  several  actions,  as  follows:

                ~ March.  (-$3,000)  This change represented a decrease of $3,000
        from the January budget, all  of which was for Research  and Development.
        This decrease resulted in reduced support to preparation and dissemination
        of technical information publications.

     "  Congressional Actions.  (-$48,400)  An  additional  reduction  of -$48,400
        was applied  to  the  Salaries and Expenses appropriation  to  meet Congres-
        sional ly mandated appropriation levels.

     -  Transfer Authority.   (No Change)  The net change  applied to this activity
        is made up  of  a. decrease  of -$14,300 to Research and  Development  and an
        increase of  +$14,300 to Salaries and  Expenses.   The  reduction is minimal
        and represents  lower  costs  than anticipated.   The Salaries and Expenses
        increase will cover essential  operating  costs.

1182 Program

     In 1932, the  Agency -is  allocating a  total  of  $251,300  and  4.2  permanent
workyears to  this   program, all  of which  is under  the Salaries  and  Expenses
appropriation.

     In 1982, the management information system  Is providing  the Toxic Substances
Chemical and Testing Research Committee with program and  project  summaries  and
technology transfer  Information which  is of  use to the Office of Toxic Substances.
This committee is composed of  representatives  from the Office of toxic Substances
and the Office  of  Research  and Development, and it plans the  research  which the
Office of Research  and  Development  produces for the Office  of Toxic  Substances.
The program also produced the  following technical  Information products:

     -  Correlation Project Research Support.

     -  Exposure Assessment Handbook.

1983 Program Request

     The Agency requests  a total  of  $192,400  and  1.1  permanent workyears  for
this program, of  which $170,500 is  for the Salaries and Expenses  appropriation
and 521,900 1s  for  the Research  and  Development appropriation.   This  reflects
a decrease of  $80,800  and  an increase of  $21,900,  respectively.  The  increase
will support  the  automated management system;   the  decrease  can occur  because
the management system will  be  fully operative  in 1983.

     In 1983, the Technical  Information and  Liaison  program  will  stress  providing
the necessary technical information to  States and local  officials  in support of
their increased role in administering envi ronnental  programs.
                                      TS-17

-------
MONITORINGSYSTEMS AMDQUALITYASSURANCE

1981 Accomplishments

     In 1981, the  Agency  used a total  of  $2,465,200  for the Monitoring  Systems
and Quality  Assurance  program, of  which  $1,448,000 was  under  the Salaries  and
Expenses appropriation  and  SI,017,200  was  for  extramural  purposes  under  the
Research and Development appropriation.

     In 1981, the  Monitoring  Systems and Quality Assurance program directed  Its
efforts Into activities which  will  Improve the  scientific quality  and  capability
of the Office  of Toxic Substances.   Specifically,  1t worked with the Office of
Toxic Substances on the following projects.

     -  Section 4  of  the  Toxic Substances Control  Act requires that the Agency
        have Information on  the  environmental  Impacts of chemicals for  existing
        and new  chemicals.   As part of this  effort,  the Office  of Toxic Sub-
        stances needs  to  validate  models  1t uses  to  predict the environmental
        Impact of  chemicals  on streams.   The program supplied an  Interim guide-
        line on  the  type  and quality  of monitoring  data  the  Office  of Toxic
        Substances needs to collect to validate the models.

     -  The Office of Toxic  Substances  needs to be able to more  adquately define
        the concentration  levels of environmental  pollutants which  pose  unreason-
        able risk to human health in order to prepare  risk assessments  1n  support
        of Sections 4  and 5  of the  Toxic  Substances Control Act.   The Monitoring
        Systems and Quality  Assurance  program Is  conducting a  two-year field
        study to develop  and  test  measurement techniques and  Instruments that
        can determine  total human exposure to  selected  environmental pollutants.
        These techniques and Instruments will  provide  Improved exposure  estimates
        for risk assessments.

     -  The Office of Toxic Substances  needs to Improve  Its capability  to relate
        pollutant exposure to the source of the pollutant, so that  harmful  chemi-
        cals can be controlled under Section 6  of  the Toxic  Substances  Control
        Act.  The  Monitoring  Systems and  Quality  Assurance  program 1$  testing
        the first phase of  a multimedia monitoring system that  will  be  used in
        this effort.

1982 Explanation of Changes from January Budget Estimate

                    January          March         Current
                    Estimate        Estimate       Estimate

                   $4,763,200      $4,693,000       $5,508,100

     The net increase  of  +$744,900 results  from  several actions,  as  follows:

     "  January - March.   (-$70,200)  This  change  represented  a decrease   of
        5/0,200 from the January  budget,  of  which  $16,000 was  for Salaries  and
        Expenses and $54,200 was for Research  and Development.  This decrease  re-
        sulted  1n  a  less  expensive  base quality assurance  program  designed  to
        provide quality assurance as an integral  portion of the  Office of  Re-
        search  and Development's  research  program In  support  of the Toxic Sub-
        stances Control  Act.                  '

     "  Reprogrmiing.   (+$1,274,800)  This reprogramming of +1,369.400  provides
        funds forthe  Total  Exposure Assessment study.   This study  concerns expo-
        sure monitoring programs  and,  as  such,  more  logically  fits  within  the
        monitoring systems  and quality assurance program.  Monitoring was a com-
        ponent of an environmental processes and effects  program for which envi-
        ronmental processes and effects had overall Initial planning and  coordi-
        nating  responsibility.  The transfer  of fund? to  monitoring reflects  the
                                      TS-18

-------
        intent of  the  initial  program.   (This  reprogramming  was included  in  a
        letter to Congress on December 16, 1981.)

        During the development  of the operating plan,  several  miscellaneous re-
        pro grammings, which  are  not reportable to  Congress,  were made  to  this
        activity and resulted in a net decrease of -594,600.

     -  Congressional fictions.   (-$459,700)   A reduction  of -$91,000 was  taken
        against tne March  estimate  reflecting the  Septmeber  12% reduction to the
        Research and Development appropriation.   This  reduction in  extramural
        resources results from the lack of need to provide contractual support from
        delayed or terminated intramural  efforts.

        An additional reduction  of  -$368,700  was  applied to  the Salaries and Ex-
        penses ($304,500)  and Research  and Development  ($64,200)  appropriations
        to meet Congressionally  mandated appropriation levels.

     -  Transfer Authprity.  (No Change)  The net  change applied to this  activity
        is made up of  a decrease of -$502,500 to  Research and Development and an
        increase of +$502,500 to  Salaries and Expenses.  The Research and Devel-
        opment decrease reflects  the  postponement  of modest  outputs  until  1983.
        The Salaries and Expenses increase  will  support major  in-house  projects
        of the lab, maintenance and repair of analytical instruments and  computer
        equipment, building maintenance, and  purchase  of gases and CO monitors.

1982 Program

     In 1982, the Agency  is allocating  a total of $5,508,100 and 29.2 permanent
workyears to this program, of which  $2,195,300 is  under the Salaries and  Expenses
appropriation and $3,312,800  is  for extramural purposes  under the Research  and
Development appropriation.

     In 1982, the Monitoring Systems and Quality Assurance program priorities are
to improve the quality  of  data  which the Office of Toxic  Substances  collects to
meet Toxic  Substances  Control  Act  information requirements  and  to  advance  the
state-of-the-art where  critical  deficiencies exist.   The  research program  goal
is to streamline and reduce costs of Section 4 testing and analysis requirements.

     -  The Office of Toxic  Substances  needs  procedures and  protocols for biolo-
        gical testing it requires under Section 4  of the Toxic Substances Control
        Act.  Additionally, the  Office  of Toxic  Substances  needs to  be  able to
        evaluate laboratories that  conduct this  testing.  The research  program
        is therefore  initiating  a   quality  assurance  program  and   developing
        laboratory evaluation guidelines on biological  testing  for the Office of
        Toxic Substances.

     -  Many  of  the methods  to  analyze  toxic   substances are still   on  the
        frontier.   The  research  program  will  continue Its commitment  to  develop
        methods to  collect  and  measure  chemicals  such as  polar   compounds.
        Research on high pressure liquid  chromatography techniques will   advance
        the Agency's ability to  determine  the  components of  complex mixtures.

     -  The 1981 research will continue  as originally intended.

1983Program Request

     The Agency requests a total  of $5,468,000 and 23.2 permanent workyears  for
this program, of which $1,856,200 is  for the  Salaries and Expenses appropriation
and S3,611,800 is  for the  Research  and Development appropriation.  This  reflects
a decrease of $339,100  in the Salaries and Expenses appropriation  and  an  increase
of $299,000 in the Research  and  Development  appropriation.   The decrease  results
from a shift  of in-house Salaries and Expenses resources to  the Research  and De-
velopment appropriation.   The Increase  will  be  used  to  strengthen  the  methods
                                      TS-19

-------
development program, primarily through the field testing of new sampling materials
and measurement Instruments needed for chemicals which are either currently regu-
lated or  are  being evaluated  under  Section 6  of  the  Toxic Substances  Control
Act.

     In 1983, the Monitoring Systems  and  Quality Assurance program  will  continue
to develop  Improved  methods and  protocols  to  more  effectively  ensure that  the
Agency's testing and evaluation  procedures  produce data of  the  highest possible
quality.  The Office of Toxic  Substances  needs  sophisticated,  chemical-specific,
sampling materials and measurement Instruments  1n  order to evaluate and regulate
chemicals under Section  6 of  the Toxic  Substances Control  Act.   Mays 1n  which
the program will  support the  Office  of  Toxic  Substances are through activities
such as:

     -  Continuation of  the 1982 research  to  develop  new  sampling  methods  and
        improved high pressure liquid  chromatography systems to analyze  complex
        mixtures.

     -  Publication of  protocols that outline  procedures  to assure  the  quality
        and consistency of data  when  blood  and urine tests are used  in chemical
        exposure and effects evaluation.

     -  Continuation  of  the   quality  assurance  audits  that  assure that  data
        collected on asbestos  contained  in  school  walls and equipment can  sup-
        port control  action decisions  by  the Agency.

HEALTH EFFECTS

1981 Accomplishments

     In 1981,  the  Agency  used a  total   of $8,207,000  for the  Health  Effects
program, of which  $3,060,700  was under the  Salaries and Expenses  appropriation
and 35,146,300  was for  extramural  purposes under  the  Research and  Development
appropriation.

     The 1981  Health  Effects  program  contributed  to the  Office  of Toxic  Sub-
stances implementation of the Toxic  Substances  Control Act by conducting research
that supports Section 4 test guidelines and Section 4 test rules.   Under  Section
4 of Toxic Substances Control Act, the  Office of Toxic Substances  has the authority
to issue test rules that require Industry to test  existing  commerical  chemicals
for potential  hazards.   When issuing  such a test rule,  the Agency must prescribe
the exact  nature of  the  required test and outline  guidelines that manufacturers
must follow in  conducting these tests.   Health  Effects research 1s  directed to
the development and improvement  of  testing  guidelines and rules in seven disci-
plinary areas specifically mandated by Section 4 of the  Toxic Substances  Control
Act: acute, subchronic, and chronic  testing; neurotoxiclty  and behavioral  effects
testing; mutagenicity testing; cardnogenlcity testing;  teratology  and  reproduc-
tive effects testing;  epidemiology;  and metabolism.  In  each  discipline, research
Is conducted to develop new tests and evaluate existing ones in order  to assure
that the most valid,  sensitive, and economical  test systems are recommended by
the Office of Toxic Substances.  Particular emphasis  is given to  the development
of tests that are less expensive or  are more rapidly performed in  order to reduce
the burden of toxicity testing on Industry.

     Major 1981  research  accomplishments  which  support  test guidelines and  test
rules include the following:

     Acute, Subchronic. and Chronic  Testing. Research  to  develop  and  validate
a testing  approach for   screening  chemicals  for  potential  immunotoxicity  was
Initiated, and work on this project continues into  1982.  The research  objective
is to select model  test systems  which are the most  sensitive and  cost-effective.
                                      TS-20

-------
     Teratology and Reproductive Effects Testing.  The validation  of a  cost ef-
fective. in vivo teratology screen  was  completed.   This  test  system is now being
used by  industry to meet Agency data requirements on new chemicals  and by other
government agencies to screen chemicals.

     Neurptoxicolpgy and Behavioral EffectsTesting.  The first phase  of the de-
velopmentand validation of a method to evaluate motor activity in animals exposed
to toxicants  was  completed.  Results of this study  were  used by  the Agency to
develop a motor activity test rule.

     tlutagenicity Testing.  Developmental  studies  on the  mouse lymphoma  assay
have confirmed  that  it  can Indeed detect  both  gene mutations and  chromosomal
damage in  the  same  system.   Once  validated,  this  unique  test  system can  be
recommended by  the Agency  in  a test guideline  or rule as a more  reliable, sen-
sitive, and  economical  mutagenlc  screening  test.   In  addition  the  Genetox
data base  was  established  to  manage  results and  monitor  chemical   testing  in
other government laboratories.  This computer system provides a rapid, scientific
resource of genetic toxicology data for use in regulatory decisions.

     Carcinogem'city Testing.  A method  was  developed to detect potential  carci-
nogens which  involves the  culturing  of  Intact metabolizing  cells (cells that are
capable of  altering  the parent test compound  to its active form)  together with
the indicator  cells  (cells in  which the biological  effect is measured).   This
co-cultivation  system  is important because  it greatly  Improves the sensitivity
of available  short-term  bloassays  to detect  potential cancer  causing agents.  In
addition 12 model carcinogens  (e.g., methylnitrosourea,  chloroform) were used to
validate each  of the  three major test systems which  comprise  the  carcinogenesis
testing matrix.

     Metabolism ....Jesting.  In vitro  studies  were completed  on  the  comparative
•ffletabollsiiTbf  aflaioxfn and  beta-naphthalene,  two  known  carcinogens,  in  human
and animal bronchus and  bladder tissues.  These results will  help  us understand
the role of metabolism in  chemical  carcinogenesis and will  be  used to select the
most appropriate animal  system  to predict the human  response,  when issuing test
rules.

     In order to provide a sound scientific basis for the evaluation of chemicals
by the Office  of Toxic  Substances and  the regulatory process,  the  Health Effects
program also conducts research  on specific chemicals in  order to provide all the
scientific information needed to  write test  guidelines and  rules.   In 1981, stu-
dies were completed which indicate that an environmentally sound, asbestos-related
mineral fiber  was  shown  to be as  tumorogenic as  commercial  asbestos, a  known
carcinogen.  Since these  fibers are not commercially produced, there  Is  no in-
dustry to bear  the burden  of  testing; therefore, the  Agency must perform its own
research.  Based on these  results,  data  is being analyzed for  the  development of
information for constructing  biological  and  mlnerologlcal models  to  predict po-
tential tumorogenesis of other naturally occurino fibers and asbestos substitutes.
These models should reduce  the  need for  extensive testing on  these other fibers.

1982 Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                   $11,915,800  .   $11,673,200     $10,488,000

     The net decrease  of -$1,427,800 results  from  several  actions,  as follows:

     ~  Jgnuary - March.   (-$242,600)   This  change  represented a  decrease  of
        $242,61)0 from the January budget,  of which $35,600 was for Salaries and
        Expenses and  $207,000  was for Research  and  Development.   This decrease
        resulted in reduced  effort in  developing tests  for  reproductive effects
        of toxic substances.
                                      TS-21

-------
          ngn
        applied to the Salaries and Expenses ($1,085,200) and Research and Devel-
        opment (5100,000) appropriations to meet  Congressionally mandated appro-
        priation levels.

     -  Transfer Author1 ty.  (No Change)  The net change applied to this activity
        Is made up of a decrease (-$1,409,000)  to Abatement, Control and Compliance
        and an increase (+$1,409,000) to Salaries and Expenses.  The reduction 1n
        Research and Development funds  reflects the decrease  of  Office of Health
        Research contributions to lower priority long-term research.  The Increase
        1n Salaries and Expenses will permit the purchase of essential supplies and
        equipment.

1982Program

     In 1982, the Agency  Is  allocating a total  of $10,488,000 and 43.2 permanent
workyears to this program, of which $4,789,900 is under the Salaries and Expenses
appropriation and $5,698,100  is  for extramural purposes under the Research  and
Development appropriation.

     In 1982, the Health  Effects  program continues to  develop  specific research
to support Implementation  of  test guidelines, test  rules,  and the new chemical
review process  under Sections  4  and   5  of  the  Toxic  Substances Control  Act.
Research will continue to evaluate and refine screening tests in each  of the dis-
ciplinary areas specifically  mandated  under the Toxic  Substances  Control  Act in
order to ensure that the most valid, sensitive and economical ones are recommended
to industry by the Agency.  The 1982 program  focuses  on:  (1) acute,  subchronlc.
and chronic testing that concentrates on the development and validation of immuno-
toxicological, pulmonary,  and cardiovascular  model  test  systems and  selection
of animal  species  that  best serve  as  predictors  of  human disease  processes;
(2) teratologlcal   and  reproductive  effects   testing   to  develop  and  validate
screening methods to  detect adverse effects  on the  reproductive system  and to
determine potential  perinatal  and  early prenatal  adverse responses to chemicals;
(3) neurotoxlcological and behavioral  effects  testing  to develop screening tests
to determine the effects of  toxicants upon the functional and structural Integrity
of the nervous system; (4) mutageniclty testing to develop and refine  the tiered,
short-term genetic damage testing  scheme;  (5) cardnogenlcity  testing for validat-
ing short-term tests  for inclusion  in the three-tiered cancer  testing  matrix;
(6) metabolism  research  to  determine  the  test  species that   best  approximate
human response, the  chemical  reactivity of  intermediates,  and  the  interaction
of metabolic  intermediate compounds  with DMA;  (7)  population  toxicology  stu-
dies to  assess  the  cause and  determinants  of  chronic disease  when  there  are
pre-existing human  exposure  situations;  and  (8) chemical-specific  research  on
asbestos and  asbestos-like materials  to  develop test systems  to  predict  the
adverse effects of these materials.

     In 1982, the program will  also conduct  structure/activity  relationship  re-
search In support  of the Agency's Toxic  Substances  Control  Act,  Section  5,  new
chemical review process.   This  Section provides  authority  for  the   Agency  to
require industry to  conduct toxicity  testing on new chemicals  (or  significant
new use) prior to their commercial manufacture.  In  order to determine  whether
a new chemical poses  unreasonable risk  or  needs additional  testing,  the  Health
Effects program 1s developing techniques and  data bases which allow  the user to
make predictions on  new chemicals based on the chemical's similarity to structure
and activity  of  chemicals on which  we have "Information.  These techniques will
Improve the scientific accuracy of, and will streamline, the Agency's new chemical
review process.

1983 Program Request

     The Agency requests  a total  of  $9,012,400 and 49.1 permanent worteyears  for
this program, of which $5,556,600  is  for the  Salaries and Expenses appropriation
and $3,455,800 Is for the Research and Development  appropriation.  This reflects
                                      TS-22

-------
an Increase of $766,700 in the Salaries and Expenses appropriation and a decrease
of $2,242,300 in  the  Research and Development appropriation.  The  Increase  Mill
cover higher laboratory costs.   The decrease represents the completion of much
of the  research  for the Initial  Implementation  of the Toxic  Substances  Control
Act test guidelines.

     The 1983 program 1s designed  to more effectively  meet the  Increasing  and
changing demands  of  the Toxic  Substances  Control  Act's   Implementation.   The
scientific support required by the Toxic Substances Control Act has been carefully
reexamlned and  efforts to  produce and validate  more  reliable  cost  effective
testing methods for Industry are of high priority.

    This program  will  conduct research in  support of two major areas:   (1)  the
Toxic Substances  Control Act, Section 4, test  guidelines and rules  and  (2)  the
Toxic Substances Control Act's Section 5,  new chemical  review process.

     Test Guljjellnes^and^.RulM.  This  program  will continue to develop,  refine,
and validate iesf""p'rS:tocols 'for determining the adverse health effects of commer-
cial  chemicals In each of the disciplinary areas mandated by the Toxic Substances
Control  Act.  Research will  focus on the development  and  validation  of  test
systems and the  selection  of  animal   species that serve as predictors  of human
disease processes.  Methods capable of evaluating  responses  of entire systems to
a toxicant  Insult  (e.g.,   cardiovascular  system; Immune   system)  or  specific
• 9*i  c
 (e.g.,
target organ toxlclty  (e.g., liver, kidney,  heart,  lung)  will be  investigated.

     -  Short-term test methods  to evaluate  specific  neurophyslologlcal,  neuro-
        chenrical  and neurobehavloral parameters will  continue to  be developed to
        assess the  functional  and  structural  integrity of  the nervous  system.

     -  More sensitive and  less  expensive  screening  methods  will  be  refined to
        detect adverse effects  on reproductive organs and processes  and  to de-
        termine potential  perinatal and  developmental  effects of toxic substances.

     -  Research  will  also  continue to  refine the  tiered,   short-term  genetic
        testing scheme which  Includes tests which can screen for,  and  confirm,
        mutagenlcity.

     -  The  validation  of  short-term  tests  for  Inclusion  1n the  three-tiered
        cancer testing matrix will  continue  in  order to   determine the  most
        reliable, sensitive, and  economical  scheme to estimate the  carcinogenic
        risk of toxic substances.

     •  Research  In  metabolism will  continue to  evaluate methods  to determine
        which animal  model  best  approximates the human  response  1n order  to
        evaluate absorption,  distribution,  and metabolism of  chemicals  and  to
        assess the reaction of Intermediate compounds with  target  organs.

     -  Research will also  continue to  develop and validate  methods In  the area
        of population toxicology  for  determining  effective Internal  dose through
        the use of chemical-specific dosimeters, blood, urine, and  tissue  analyses
        and the study  of  chemical-receptor Interactions  1n  animals  and humans.
        Methods to determine Indicators  of adverse response will also be validated
        1n order to better  understand the biological   significance of  human test
        systems and to verify  the ability of. animal   models to predict the human
        situatlon.

     The data  from each  of the above areas will  be  used  for regulatory testing
standards and  guidelines  and  for  the  risk  assessments  needed  for  regulatory
decisions.  The toxiclty  of non-commerlcal asbestos  silicates,  to  which  people
are environmentally exposed from  mining and quarrying, will also  be evaluated In
order to provide health Information not otherwise  available  through  manufacturer
testing or  existing  scientific literature  and data  bases; this information  may
be utilized In test rules.
                                      TS-23

-------
     New Chemical Review Process.  The  objective  of the  research 1s  to  develop
techniques, models,and data bases to predict the metabolism, mode of action, and
suspected tenacity  (e.g.,  carcinogenic, mutagenlc, pulmonary,  etc.),  of  a  wide
variety of  premanufacture  notification  chemicals  based  on  structure/activity
relationships so  that the Agency  can reduce the economic  burden of  testing  on
industry.  This  information  will  be  used to decide  whether or  not there  Is  a
need for further  testing  by  industry before a potentially  hazardous chemical  is
commercially produced.

EMVIRONMENTAL ENGINEERING AND TECHNOLOGY

1981 AccoropJIshments

     In 1981,  the  Agency used  a  total  of $1,300,300  for  the  Environmental
Engineering and  Technology program,  of which $502,200 was  under  the  Salaries
and Expenses appropriation and $798,100  was for extramural  purposes under the
Research and Development appropriation.

     The Environmental  Engineering and  Technology  program provides engineering
studies and  other  analyses   of   chemical  manufacturing  methods  regarding  the
potential of the methods to reduce or eliminate  toxic  contamination and/or toxic
waste discharges.   These   studies  and  analyses  are valuable  to  the  Office  of
Toxic Substances  in deciding  whether  or not to  regulate.   For,  if it is  known
that a  chemical  manufacturing process or a chemical disposal  process  adequately
controls a harmful chemical,  the  Agency may be able  to  allow use of the chemical.
The Environmental  Engineering and  Technology  program,  therefore,  supports the
Office of Toxic Substances in the new chemical  review  process and in the  chemical
evaluation and  control  process.    The Environmental Engineering  and  Technology
program also  provides  support  to Regional  toxics  enforcement  efforts.   The
Environmental Engineering  and Technology  program  support  is  in  the  form  of
direct consultation  support and  In the form of  research  studies and  analyses.

     Direct Consultation Support.  In 1981, more than 300 premanufacturlng  noti-
fications were  revlewed  by the Environmental Engineering and Technology  program
for the new  chemical  review  process.   The Environmental Engineering and  Techno-
logy program developed  and maintained  data  bases for  the  Office of Toxic  Sub-
stances to use  in  both  the new chemical review  process and in chemical  control
actions.  Technical  consultation  was  provided to Regions I,  II,  V, VI,  and VII
for enforcement activities regarding PCBs,  dioxins and  furans.

     Research Studies and Analyses.  The Environmental  Engineering  and  Techno-
logy program assessedalternative  ways  to  dispose of  PCBs and began research  on
alternative non-thermal  disposal  methods for PCBs,   The Environmental Engineering
and Technology program  is  studying asbestos in  commercial  products.  Also, the
program will examine materials which could potentially  be proposed as substitutes
for asbestos.

1982 Explanation of Changes from  January Budget Estimate

                     January           March         Current
                     Estimate         Estimate       Estimate

                    $1,777,400      $1,728,300       $1,639,600

     The net decrease  of  -5137,800  results from  several  actions,  as  follows:

     -  January- March.   (^$49,100)   This  change  represented  a  decrease  of
        549,loo ff-ofti He  January budget, of which  54,500  was  for  Salaries and
        Expenses and $44,600 was  for Research and Development.  This  decrease re-
        sulted in reduced  effort  in the area of  substitute/alternative manufac-
        turing methods to  reduce or  eliminate toxic  contamination  and/or  toxic
        waste discharges.
                                      TS-Z4

-------
        -  COngressi pnal  Acti ons.    (-$88,700)   A  reduction  -$88,700  was  applied
           to we Salaries  and Expenses  ($62,400)  and  Research  and  Development
           ($26,300) appropriations to meet  Congressionally mandated  appropriation
           levels.

        -  Transfer Authority.   (No Change)   The net change  applied  to this activity
           is made  up ofa decrease of -$115,700 to  Research  and Development and  an
           increase of +5115,700 to Salaries  and Expenses.   There will  be a delay  in
           lower priority projects. -The Salaries  and  Expenses increase will  allow
           lab program reviews  and monitoring  of  extramural  projects,  as well  as
           more program evaluation  studies.

1982 Program

        In 1982, the Agency is  allocating  a  total  of $1,639,600 and  11.5  permanent
   work years to this program, of which $673,700 is under the Salaries and Expenses
   appropriation and $965,900  is  for  extramural  purposes  under the  Research and
   Devel opment appropri ati on.

       In 1982, the Environmental  Engineering and  Technology  program will  continue
   its direct support to  the  new chemical review process and to Regional  enforcement
   efforts.   Additionally, the  Environmental  Engineering  and  Technology  program will
   provide valuable  assistance to the  States  and Regions through the publication  of
   guidance documents to  use in the implementation of the PCB  disposal  regulations.
   Another guidance  document  will  be published which  characterizes and  estimates
   the release rates of  asbestos from the  use and disposal  of  commerical  products.
   Valuable information   on the  release rates  of  plastic additives, rubber,  paper
   chemicals, and dyestuffs will be made  available.

   1983 Program Request

        The Agency   requests  a  total  of  $527,600  and  5.3  permanent  workyears for
   this program, of  which $384,900 is for the  Salaries and Expenses  appropriation
   and $142,700 is  for the Research and Development  appropriation.  This  reflects a
   decrease of  $288,800  in  the  Salaries and  Expenses appropriation  and  $823,200
   in the Research  and Development appropriation.  The decrease will  result in more
   dependence on in-house research capabilities and  a  shift to add support  to high
   priority hazardous waste  research.

       The 1983 program will  continue supplying  technical support  to the  Office  of
   Toxic Substances  for review  of  premanufacturing notifications.  The program will
   also continue to  provide  direct technical  consultation  to  Regional  offices for
   enforcement activities regarding PCBs, dioxins,  furans, and other  toxic chemcials.

   ENVIRONMENTAL PROCESSES AND EFFECTS

   1981 Accompl1shments

        In 1981, the  Agency  used  a  total  of  $11,520,300 for  the  Environmental
   Processes and Effects program,  of  which  $4,862,000 was  under  the   Salaries
   and Expenses  appropriation   and  $6,658,300  was  for  extramural   purposes  under
   the Research and  Development  appropriation.

        The Environmental Processes  and  Effects  program,  similar to  the  Health
   Effects program,   contributed to  the  implementation  of  the  Toxic  Substances
   Control Act by  conducting  research that  supports test  guidelines, test  rules,
   the new  chemical  review   process,  and   the chemical   evaluation  and  control
   process.  The program develops  tests and models that  assess how hazardous  or
   toxic a chemical  will  or  will  not  be in  the environment  at  various levels  of
   concentration; and whether  the  chemical   will  persist  In  the  environment,  or
   whether it  will  be diffused  or degraded.  The Office  of  Toxic Substances can
   use the models for  the new  chemical  review  process  and prior  to issuing  test
                                         TS-25

-------
rules to  predict  risk and  to. evaluate  which  chemicals need  more testing.   The
Office of Toxic  Substances  uses  the tests  developed by  environmental  research
1n test guidelines  that  Industry  follows when It  conducts testing on chemicals.
Information gleaned by the tests and models  enables the Office of Toxic Substances
to assess whether or not a chemical poses unreasonable risk.

     Major 1981 Environmental  Processes  and Effects  research  efforts  and  the
Toxic Substances Control  Act Implementation activities they support are:

     -  The final  version of  a user's manual for an evaluated and refined exposure
        analysis modeling system was  completed.  This model  Is being used  by the
        Office of Toxic  Substances and others, Including  Industry and acadenrfa,
        to estimate  environmental   concentrations,  and  the  expected  fate,  of
        chemicals  Introduced Into  aquatic ecosystems.

     -  A study of the  fate of a  number  of toxic air pollutants was reported,
        using newly developed experimental  protocols that measure  reaction  rate
        constants.  The  Information was  used to estimate environmental  risk  such
        as the effects of migration of certain air pollutants Into the stratosphere
        and the troposphere.

     -  Major technical assistance was provided to the Office of Toxic Substances
        1n evaluating  the environmental  risk  resulting  from the  manufacture,
        distribution, use, and disposal  of  six  chlorinated hydrocarbon solvents.
        This document  1s  being  used by  the Agency to make  regulatory decisions
        1n the Agency wide effort to Integrate toxic chemical  programs.

     -  Tests previously  developed for the measurement of toxicity have been  val-
        idated through a  series of Inter-laboratory comparisons.  These tests  pro-
        vide methods to evaluate acute and  chronic toxldty  and bloaccumulatlon;
        and, they  also provide methods  to  conduct bioassays and  life-cycle  stu-
        dies on freshwater,  marine,  and  estuarlne  organisms  1n response  to toxic
        chemical  Insults  to the environment.

     -  The research program has completed a data base and established Initial  cor-
        relations  to predict toxiclty and bloaccumulatlon from structure/activity
        relationships for nine classes of chemicals commonly observed 1n  premanu-
        facture notification reviews.   As a  result, the process of screening toxic
        materials  will be  considerably  shortened, and the resource requirements
        will be reduced.

1982 Expl anation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                   514,361,100     $13,980,100      $10,455,900

     The net decrease  of -53,905,200 results  from several actions, as  follows:

     "  January-March.    (-$381,000)   This change  represented   a  decrease  of
        s3₯l,QWfrom the January  budget,  of which $31,000 was for Salaries  and
        Expenses and $350,000 was  for Research and Development.   This  decrease
        resulted  1n a  reduction 1n environmental   exposure and effects  research
        and methods development.

     -  Reprogrammlng.   (-$1,412,100)   This reprogramnrlng transfers  $1,396,700
        for the total  Exposure  Assessment  study.  This  study concerns  exposure
        monitoring programs and, as such, more  logically fits within the  monitor-
        Ing systems and  quality  assurance program.  Monitoring was a component
        of an environmental  processes and effects  program for which environmental
        processes  and  effects had  overall  Initial  planning  and  coordinating
        responsibility.  The transfer of funds to-monitoring reflects  the  Intent
                                      TS-26

-------
        of the  Initial  program.   (This reprogramnring was  included  in the letter
        to Congress on December 16, 1981.)

        During  the  development  of  the  operating  plan,  several  miscellaneous
        reprogramnrings, which are  not reportable to Congress,  were  made to this
        activity and  resulted in a net decrease of -$15,400.

     -  Cqn|ressiona1 Actions.  (-$1,737,100) A  reduction  of -$846,600 was taken
        against the Marchestimate reflecting the September 1256 reduction to the
        Research and  Development  appropriation.   A portion   of  the  reduction
        ($827,700) reflects  the House and  Senate  Conference action  on  our 1982
        appropriation Bill.   The   additional  reduction  ($18,900) has  a  slight
        impact  on  the round  robfn evaluations  of the "fate  process"  protocols
        for obtaining equilibrium constants.

        An additional  reduction of  -$890,500 was applied  to  the Salaries  and
        Expenses appropriation  to  meet  Congressionally  mandated  appropriation
        levels.

     -  Transfer Authority.   (-$375,000)  The net decrease applied to this acti-
        vity is made up of a  decrease  of -$761,000 to Research and Development and
        an increase of  +$386,000  to Salaries and Expenses.  The  decrease  to Re-
        search and Development results from  the completion of much of the research
        which supports test  standards  and test  rules and  the delay and/or reduc-
        tions in scope  of lower priority  projects.  The Increase  to  Salaries and
        Expenses will be used to meet shortfalls 1n lab operations.

1982 Program

     In 1982, the Agency 1s  allocating a  total  of $10,455,900 and 77.2 permanent
work years to this program,  of which $6,082,900 is under the Salaries and Expenses
appropriation and $4,373,000  is  for  extramural  purposes  under the Research  and
Development appropriation.

     The objective of the  1982 program is  to  develop  Improved,  validated,  and
cost-effective methodologies  that  predict  transport and  fate  of toxic  chemi-
cals in the  environment and that define exposure  and  hazards associated  with
toxic chemicals  to  environmental  species  and ecosystems.   Such  methodologies
are critical  in evaluating  environmental  risk under Section 4  of  the Toxic Sub-
stances Control Act and in  evaluating new chemicals under  Section 5.

     The 1982  research  program  consists  of four major themes, a  description  of
which follows.

     Enyironmenta]Fate.  The  research  is  comprised  of  two  components  that
sequeriti ally lead to  methodologles  that  evaluate  how toxic   substances  impact
the environment.  These  components are process characterization and  test  method
development.

     -  Process  characterization  examines  basic  environmental   mechanisms  of
        toxic substances, such  as  photolysis and  microbial  degradation and  the
        fate of toxic chemicals in soil and water.

     -  Test method development extends the  study  of  certain of these mechanisms
        to establish  reproducible,  "standard" tests for  environmental  processes
        such as chemical leaching  in soil,  hydroponic uptake,  or  root  exposure.

     Environmental Toxicology.  The  research  develops methodologies  that  define
the toxiciiy  and hazard of Chemicals  to organisms  and to  their  ecosystems.   Such
methodologies are used to test chemicals and to estimate environmental  hazard from
chemicals  as  required under Sections 4 and 5 of the Toxic  Substances  Control  Act.
                                      TS-27

-------
Environmental toxicology  tests currently  being  developed  are  classified  into
the following four areas:

     -  Aquatic toxicology  research  Identifies, develops, and validates testing
        methods to  define  hazards  of  chemicals  to  freshwater,  marine,   and
        estuarine species.

     -  Terrestrial   toxicology  research  develops,  for  both plant  and  animal
        species, methodologies to  define  plant  uptake,  phytotoxldty,  tvioaccumu-
        lation, and toxicity of chemicals to food-chain systems.

     -  Environmental  genetic toxicology  research  studies  the  interaction  of
        chemical and physical  agents with the process of heredity; this produces
        important information  on  toxic,  pathogenic, and  carcinogenic  effects.

     -  Ecotoxicology research studies the  effects of  toxic chemicals  on  eco-
        system processes, as well  as on species of concern to man.

     Developmentof Predictive Techniques.  The research focuses on methods  that
can quickly  and  reliably evaluatetoxic  hazards  and exposure concentrations  of
large numbers  of chemicals in  various  compartments  of  the environment  (air,
water, and  terrestrial).   Data on hazard and  exposure  are being  used by  the
Office of  Toxic  Substances  in risk  estimations  of chemicals  under  the Toxic
Substances Control  Act.   Four approaches In  developing the  Agency's  predictive
capability comprise this effort:

     -  Comparative  toxicology  is the  study  of  the  relative  sensitivity  of
        various biological  taxa   to  Individual  toxic  materials   or   to  toxic
        materials in general.   The results  of this  research enable  the Agency
        to choose a single species to serve as a surrogate for a  larger community
        in test guidelines and rules.

     -  Structure/activity  concepts  utilize  molecular  structure  characteris-
        tics, physical/chemical  properties,  transport  and transformation char-
        acteristics, and  chemical-free  energy  relationships of   chemicals  to
        predict the  fate and  toxic effects  of  chemicals.   Structure/activity
        models will   be  used by  the  Office  of  Toxic  Substances  to rapidly  and
        Inexpensively screen classes of existing  or new  chemicals to determine
        if they pose substantial  risk  or  if they can  be exempted from  the  new
        chemical  review process.

     -  Exposure assessment models are being  developed to predict the  exposure
        concentration of chemicals in  various environmental  media. The exposure
        concentration data generated by these models enable the Agency  to fulfill
        Its Sections 4  and  5  responsibilities  to  determine  the risk  chemicals
        may pose to humans and to the environment.

     -  Effects  models  are  being  developed  to  provide  rapid,  simple,   and
        cost-effective  techniques  to predict accumulation and effects  of  toxic
        chemicals in food chain systems.

     Extrapolation from theLaboratory  to the Real Environment.   The objective of
the researcnf Ts  to  vaTTdateT 1 abbratory  test methods  and  models  1n microcosms,
model  ecosystems, and  field  situations.   In  this way,  these  test methods  and
models are made valid,  meaningful, and  legally enforceable, thereby strengthening
the Agency's capability  to  make   regulatory decisions  on  an  improved  scientific
basis.  The sequential  steps in this activity are as follows:

     -  Microcosms  and  model  ecosystems  are  being developed to  predict  fate,
        effects, and movement  of  chemicals  in  freshwater,   groundwater,  marine
        estuarine, and  terrestrial environments.
                                      TS-28

-------
     -  Field  validation Improves exposure  concentration predictions  and toxic
        effect assessments  by  evaluating the laboratory  fate  and  effects models
        In  natural ecosystems.

1983 Program Request

     The Agency requests a  total  of $9,428,900 and 70.5  permanent workyears for
this program,  of  which  $6,239,800  1s  for the Salaries and Expenses appropriation
and $3,189,100 is for the Research and Development appropriation.   This reflects
an increase of $156,900  in the Salaries and Expenses appropriation and a decrease
of $1,183,900  in  the  Research  and Development appropriation.  The Increase will
cover higher laboratory  costs.  The decrease reflects the completion  of Initial
test method  development  on environmental  fate and  toxiclty  required  for  the
implementation of the Toxic Substances Control Act.

     The 1983  Environmental Processes  and  Effects  program  has   been  designed
to more effectively  develop and  validate reliable,  cost effective methods  for
testing toxic  chemicals,  as  well  as  to provide  support  for development  and
validation of  predictive methods  for  toxic chemicals  in  support of  the  new
chemical review process.  The  objectives are to Improve  scientific accuracy and
to strengthen  the Agency's legal  position.   The main  thrusts of  the  1983 plan
Include:  (1)  the development of  methodologies and  validation  of models  which
define chemical  exposure and  environmental   risk  from  chemical   substances  and
mixtures;  (2)  the development  of predictive methods  to  rapidly  screen  potential
fate and environmental  toxiclty  of new chemicals  under  Section  5  of  the Toxic
Substances Control Act;   and (3) the identification  of laboratory tests and models
to be validated under  field  situations in the  Agency's  Program Integration Project.

     The 1983  research  program consists  of  seven  major  themes.   Four  of  these
continue research  from   1982.  Three  new  themes  are  added  in  1983;  they  are:
indirect human exposure, data  base development, and  technical  assistance.  The
research to be conducted under these themes follows.

     Envi ronmental Fate.

     -  The Office of Toxic Substances needs standard advanced fate tests which
        precisely define laboratory test  parameters  so that test  results  can  be
        extrapolated to   the real  environment.   Such  fate tests will  provide
        exposure data for  chemical  risk  assessments  performed  by  the Office  of
        Toxic Substances  under Section 4 of the  Toxic  Substances Control  Act.

     -  The  program   will   address  the  specific  need  of the Office  of  Toxic
        Substances by developing  methodologies  for   testing the   fate,  effects,
        and exposure  of  metal  and  organ onset allies  in  the  environment.   Such
        methodologies will  enable  the  Office  of Toxic  Substances to carry  out
        risk assessments for organometalUcs.

     Env1ronmental Toxi cology.

     -  Research will continue in  aquatic toxicology.  The Office  of Toxic Sub-
        stances uses, the validated tests in test rule  development for determining
        the hazard and risk of chemicals  under Section 4  of  the Toxic  Substances
        Control Act.

     -  The  Agency has  developed  several   test methods  for  defining  toxiclty
        based on  single  species.    System-level   research  will   now   focus  on
        developing tests to define  toxiclty  at  the community level.  The Office
        of Toxic  Substances  needs  data on toxic effects at the ecosystem  level
        when it evaluates the total  toxiclty  of  chemicals.
                                      TS-29

-------
     -  The development of  culturing  techniques  will  help  to define and standar-
        dize species and diets  for  environmental  effects testing.   Such standar-
        dization of species will  reduce the number of species,  and hence resources,
        in the tests required to evaluate  chemicals under  Section 4 of the Toxic
        Substances Control Act.

     -  Research will  continue  to  develop  terrestlal  toxicology  which the Office
        of Toxic Substances  needs  to evaluate the  impact  of toxic  chemicals  on
        the environment, and ultimately, on man.

     DevelopmentofPredictive Techniques.

     -  Exposure  assessment  models  will   predict  exposure  concentrations  of
        chemicals in air,  water, land, food chains, and multi-media environments.
        During 1983 work will  be  devoted to developing  and validating such models.
        Data generated  by  these predictive  methodologies  will  be  used  by  the
        Office of Toxic Substances  to perform risk assessments  and risk benefit
        determinations on  chemicals.

     -  The  program will   continue  to develop   structure/activity  methods  for
        rapid toxidty and  fate  screening  of existing and new chemicals and  for
        extending hazard  evaluation methods to  additional  classes  or  types  of
        chemicals by  comparative  techniques.    This  approach  will  provide  a
        cost-effective tool for  the  evaluation  of the potential  toxtclty  of  new
        chemicals.

     -  Comparative  toxicology   1s  designed  to  define (1) how  much testing  Is
        needed for an  adequate  assessment  of risk, (2) when one  species  can  be
        used to test and predict for other species, and (3)  which  combination  of
        species and toxlcity  tests  can  be considered  most predictive.   It  will
        also involve  the   assessment of  the  relative  sensitivity  of  various
        testing systems (single  species, multlspecies, microcosms,  etc.).  This
        research will  reduce  the number  of species to be  tested  under Section 4
        of the Toxic Substances Control  Act, and thereby  decrease the  costs  of
        testing.

     Extrapolation from the Laboratory to the Real Environment.

     -  The program will continue  to develop microcosms and  model  ecosystems  to
        validate test  methods  and  models.    Microcosms provide a  cost-effective
        tool to validate  exposure  assessment models and to screen the  fate  and
        effects of chemicals  in  order to implement Sections 4 and 5 of the Toxic
        Substances Control   Act.  This research  will  provide  the  capability  to
        extrapolate from laboratory models  and  methods to the  real  environment.

     -  The field validation  program  will  focus on Identifying tests  and models
        that should  be validated.   Such  field validation  studies  will  improve
        the scientific  basis  of regulation conducted by  the  Office   of  Toxic
        Substances.

     Indi rect Human Exppsure.  Activities will  focus on developing methodologies
to measure and predict indirect human exposure  that occurs  through consumption  of
plants and animals that have become contaminated.  The Office of Toxic Substances
needs such  techniques,  along with  direct  exposure  assessment  data, to perform
risk assessments on toxic  chemicals.

     Data Base Deyelppment.  The program  will   develop a  specialized data  base
system by  compiling,  consol 1 datlng, and critically reviewing existing  chemical
and toxidty  data.   The   Information generated   will  be  Incorporated  into  a
user-oriented data base to  be used  by the Office  of Toxic  Substances  in evalu-
ating complex data on new  chemicals.
                                      TS-30

-------
     Technical Assistance.  The program will provide  technical  assistance to  the
Officeof toxic  Substances and  to the Regions  In several  areas.  These  areas
are:  (1) critical  review and screening  of  selected  new chemicals  under consi-
deration for  Section 5  premanufacture notification  exemption,  (2)  support as
required for validation of toxicity tests, and  (3)  exposure  and  risk  assessments.

STRATOSPHERIC MODIFICATION

1981Accompl1shments

     In 1981, the Agency used a total  of $1,361,600 for the  Stratospheric  Modifi-
cation program, of which  $146,500  was  under  the  Salaries and Expenses  appropria-
tion and $1,215,100 was  for extramural purposes under the Research  and Development
appropriation.

     Stratospheric Modification  research   is  mandated  by   the  Clean Air  Act
Amendments of  1977.   The purpose  of  the  Stratospheric  Modification  program
is to provide  state-of-the-art knowledge  and coordinate research on the  causes,
effects, and control  of stratospheric ozone depletion.

     The major accomplishments of  the 1981 Stratospheric  Modification  program
include:

     -  Continuation of research  and  assessment  of the present knowledge  on  the
        relationship between   ultrav1olet-B radiation  and skin  cancer.  The  re-
        search indicates  that the relationship  between ultraviolet-B  radiation
        and melanoma skin cancer  is  not  as certain  or  straightforward  as  the
        relationship between ultrav1olet-B radiation and nomelanoma  skin  cancer.
        The evidence Indicates the existence  of a complex relationship.

     -  Continuation of  research  which  provided  updated data  for use  by  the
        National  Academy  of  Sciences  and  other  organizations engaged  In  making
        Improved Integrated assessments of  the causes  and  effects and controls
        of stratospheric ozone depletion.

     -  Continuation of  studies  of  ultraviolet-B effects  on  key  marine life
        forms.  The specific  target  populations  and methodologies used in  these
        studies were based  in part on  the  results of  the  studies conducted in
        1980 on  plankton   organisms,   shrimp  and   crab  larvae,   and   mackerel.

     -  Initiation of  studies on the adaptability  of plants under field  condi-
        tions to   enhanced ultraviolet-B  radiation  in  order to  understand  why
        plants are affected to  a greater degree in laboratory  control chambers
        than 1n the field. The plants selected for study (wheat,  corn,  soybeans,
        rice, citrus) have high economic  value.  The  program continued to  study
        the role   and  effects  of  ultraviolet-B  radiation 1n the  photosynthetic
        process.

     -  Initiation of the third biennial  research report to  Congress on research
        concerning causes  and effects  of stratospheric ozone  depletion.

1982 Explanation  of Changes from January Budget Estimate

                     January           March          Current
                     Estimate        Estimate       Estimate

                    $1,060,500      $1,041,100         1917,500

     The net decrease  of   -$143,000  results from  several  actions,  as follows:

     "  January - March.    (-$19,400)   This  change  represented  a  decrease  of
        $19,400 from the January budget, of  which $1,300 was  for Salaries  and  Ex-
        penses and  $18,100 was  for  Research  and Development.   This decrease
                                      TS-31

-------
        resulted 1n  a slight  reduction  in  the research  on  biological  effects
        (non-health, specifically  ultra  violet band  aquatic  and  agricultural
        effects).

     -  Congressional Actions.  (-$41,700)  A  reduction  of -$41,700  was  applied
        to salaries and Expenses  ($3,400) and  Research and Development ($38,300)
        appropriations to  meet Congressional 1y mandated  appropriation  levels.

     -  Transfer Authority.  (-$81,900)  The net decrease applied to  this  acti-
        vity is made up of a decrease of -$91,900 to Research and Development and
        an increase of +$10,000 to  Salaries  and Expenses.  The Research  and De-
        velopment decrease results from lower cost estimates;  there is, therefore
        no adverse  impact  on the  program.   The Salaries and Expenses  increase
        will cover essential  operating costs of the program.

1982 Program

     In 1982, the  Agency  is  allocating a total  of $917,500  and 2.3  permanent
workyears to this  program, of  which $151,500 is under the Salaries  and  Expenses
appropriation and  $766,000 is  for extramural   purposes  under the Research  and
Development appropriation.

     The 1982 Stratospheric  Modification research  program is currently  focused
to:

     -  Work closely  with the National Academy  of Sciences,  who will  publish
        a comprehensive assessment  of  state-of-the-art   knowledge and  research
        needs.

     -  Prepare the third  biennial  research report to the Congress, which  will
        be delivered in February 1982.

     -  Continue to conduct research  begun In  1981  on the adaptability  of plants
        to enhanced  ultraviolet-B  radiation under  field  conditions,  study  the
        effects of  ultraviolet-B  radiaton  on   key  marine  life,  and  coordinate
        Federal  research.

1983 ProgramRequest

     The Agency  requests  a total  of $873,100  and  1.8  permanent workyears  for
this program, of  which $130,700 is  for the  Salaries and  Expenses appropriation
and 5742,400 is  for the Research  and  Development appropriation.   This  reflects a
decrease of  $20,800  in  the  Salaries  and   Expenses  appropriation  and  $23,600
in the  Research  and  Development  appropriation.   The   decrease results   from
management efficiencies;  the  total  level  of  funding can cover the  essential
activities.

The 1983 Stratospheric Modification program  Includes the  following:

     -  Continue  to  conduct  research  beginning in  1981  on  the  adaptability
        of plants  to  enhanced ultraviolet-B  radiation   under  field  conditions,
        study the  effects  of  ultraviolet-B  radiation   on  key   various  life,
        and coordinate Federal  research.

     -  Continue support for  the updated comprehensive  assessment of the  state
        of knowledge and research needs (based  on new knowledge obtained  in  1982
        and 1983), to be prepared by the National Academy  of Sciences  (Information
        and the report are  due early In  1984).

     -  Prepare  the  fourth   biennial   research report   to   the   Congress,   due
        December 1983.
                                      TS-32

-------
NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

1981Accomplishments

     In 1981,  the Agency  used  a  total  of  $3,173,300 for  the National  Center
for lexicological  Research program,  all  of  which  was  for extramural  purposes
under the Research and Development appropriation.

     The primary  function  of the  National   Center  for  lexicological  Research
is to conduct  research that  tests  for health  effects caused  by  long duration,
low level  exposure to  chemicals*   This Includes  projects  such  as an  additive
risk study  recommended by the  National   Academy  of Sciences.   In  1981,  the
Center performed  research  of longer-term  interest  to the  Agency, the Food  and
Drug Administration, and other Federal agencies.  Such projects Included:

     -  Long-term  carcinogenesis  studies  that  will  identify the  cancer  causing
        potential of  certain  chemicals at Tow  doses  administered over  long  pe-
        riods of time.

     -  Long-term,  chronic exposure  studies to  examine  health  effects  on  or-
        ganisms dosed  with  chemicals  over   approximately  three-year  periods.

     -  Mutagenesis,  Immunotoxicology,  chemical  pathology, and  reproductive  and
        developmental toxicology studies*

1982 Explanationpf Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                    $4,500,000      $4,500,000      $1,823,300

     The net decrease of -$2,676,700 results  from the following action:

     -  Congressional Actions.   (-$2,676,700)   A reduction of  -$2,676,700  was
        taketragainst the March estimate reflecting the September 12% reduction to
        the Research and Development appropriation.   The support for  the  National
        Center for lexicological  Research is being  reduced  in  order  to focus  the
        research program on more Immediate needs of the toxic  substances  control
        program.

1982 Program

     In 1982, the Agency   1s  allocating  a total  of $1,823,300 to this  program,
all of  which is  for  extramural purposes under the Research  and Development
appropriation.

     In 1982, the  Agency  will  continue to fund  the core  research  program at  the
Center at a  reduced level  of funding.  The  Agency has  reduced  its  efforts  on
long-tern research  studies,  such as  the National  Center for Toxicological  Re-
search conducts,  in  order to concentrate  its  research efforts to directly sup-
port the Toxic  Substances  Control  Act  implementation.   The  1982 program will
continue efforts  on  additive  risk  to determine if cancer  causing  agents  exert
additive effects  when administered  in combination.   Also the  program   is con-
tinuing research  on  risk  estimation  that will  be  used  to assist  in  extrapo-
lating animal data  to humans.   Finally,  the National  Center  for Toxicological
Research program  1s  continuing  carcinogensis studies as well  as  the  develop-
ment of long-term in vitro and in vivo assays.
                                      TS-33

-------
1983i Program Request

     The Agency  requests  a  total  of  $910,000 for  this  program,  all  of  which
1s under the  Research  and Development  appropriation.   This reflects a  decrease
of $913,300.  We  have  decreased funding to  the  National  Center  for Toxicologi-
es! Research because the  Agency fs concentrating  its  resources on  shorter-term
research which more  directly supports  the  Agency's needs.  Each  year the  pro-
gram is  designed  by  collaboration between the  Agency and  the  Food  and  Drug
Administration; and,  it  includes  long-terra  projects  of  mutual  interest  to
both agencies.
                                      TS-34

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                                           TOXIC SUBSTANCES

                                     Toxic Substances Strategies
                                     ACTUAL
                                      1981
             JANUARY
             ESTIMATE
               1982
           MARCH
          ESTIMATE
            1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
PROGRAM
                                              (DOLLARS !H THOUSANDS)
Testing 4 Evaluation
 Salaries 4 Expenses
 Abatement Control J
 Compliance

Chemical Control
 Salaries 4 Expenses
 Abatement Control &
 Compliance

TSCA Information
 Salaries & Expenses
 Abatement Control 8
 Compl 1 ance

Toxics Integration
 Salaries A Expenses
 Abatement Control 8
 Compl1ance

Toxics Management
 Salaries 8 Expenses
 Abatement Control 8
 Compliance
 $6,842.9   $8,698.0   $7,938.6   $7,647.5   $6,652.1   -$995.4
$18,324.7  $21,823.3  $18,867.9  $10,212.2  $12,863.7  $2,651.5
 $4,327.1   $5,777.5   $5,013.7   $4,782.8   $4,618.0   -$164.8
 $6,558.6   $6,623.9   $6,473.9   $5,473.9   $3,718.9 -$1,755.0
 $5,792.3   $7,653.8
$11,276.8  $11,905.5
 $1,453.9
 $3,262.4
         $4,895.2   $4,357.7   $4,494.6    $136.9
         $7,531.2   $5.932.5   $3,460.0 -$2,472.5
         $1,394.0   $1,389.2   $1,161.6   -$227.6
         $2,941.8   $1,919.1   $2,353.4    $434.3
   $761.7
    $63.0
$818,7

-------
                                                                TOXIC SUBSTANCES

                                                           Toxic Substances Strategies

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981      ESTIMATE    ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                   1982       1982       1982            1983 VS 1982
                                                                (DOLLARS IN THOUSANDS)
                  Interagency
                  Regulatory Liaison
                  Group
                   Abatement Control I
                   Compliance
                                     $109.4
L>1
at
TOTAL:
 Salaries & Expenses
 Abatement Control 1
 Compliance

Toxic Substances
Strategies
                                          TOTAL
$19,177.9  $22,948.0  $19,241.5  $18,177.2  $16,926.3 -$1,250.9
$39,594.9  $40,352.7  $35,814.8  $23,537.7  $22,396.0 -$1,141.7
$58,772.8  $63,300.7  $55,056.3  $41,714.9  $39,322.3 -$2,392.6
                  PEIWANENT FULL-TIME  WORKYEARS
Testing & Evaluation
Chemical Control
TSCA Information
Toxics Integration
Toxics Management
TOTAL PERMANENT WORKYEARS
181.6
124.3
105.0
27.4
18.3
4S6.6
212.3
156.5
128.8

13.5
511.1
203.3
152.5
77.4
31.4

464.6
193.6
138.3
67.7
29.0

428.6
174.9
136.7
57.7
21.0

390.3
-18.7
-1.6
-10.0
-8.0

-38.3

-------
                                           TOXIC SUBSTANCES



                                     Toxic Substances Strategies

TOTAL WORKYEARS
Testing S Evaluation
Chemical Control
TSCA Information
Toxics Integration
Toxics Management
ACTUAL
1981

207.9
ISO .6
121.1
44.9
21.5
JANUARY
ESTIMATE
1982

234.7
173.6
150.9

21.0
MARCH
ESTIMATE
1982

224.7
168.6
87.7
43.2

CURRENT
ESTIMATE
1982

213.9
153.3
76.8
40.8

ESTIMATE
1983

193.5
152.4
63.0
28.5

INCREASE +
DECREASE -
1983 VS 1982

-20.4
-.9
-13.8
-12.3

TOTAL WORKYEARS
546.0
580.2
524.2
484.8
437.4
-47.4

-------
                               TOXIC SUBSTANCES

                          Toxic Substances Strategies

Budget Request

     The Agency  requests  a  total   of $39,322,300  and  390.3  permanent  work-
years for  1983,  a  decrease  of $2,392,600  and  38.3  permanent  workyears  from
1982.  Included  in this  total  is  $16,926,300  for  Salaries  and Expenses  and
$22,396,000 for Abatement,  Control  and Compliance, with decreases of $1,250,900
and SI,141,700, respectively.   Reductions reflect  completion of  development  of
basic test guidelines  and some  shift  of emphasis  from  the  regulatory  approach
for controlling existing chemicals to voluntary control  strategies.

ProgramDescription

     This subactivity  comprises the testing  and  evaluation, chemical  control,
TSCA information and toxics integration elements.  These elements  support Agency
activity under  the  Toxic  Substances   Control   Act  (TSCA)  including  testing,
assessment, new chemical  review, existing  chemical  control, economics,  record-
keeping and  reporting,  data  management, monitoring,  and  toxics  Integration.

     Testing and Evaluation — This program includes all aspects  of  the  develop-
ment W~^e«~rinies~1an5~srEahdards,  interpretation of test results, and implemen-
tation of all  features  of the  TSCA  Section  4  testing  authorities.  Also  Included
are health and environmental   risk  assessments  for new  and  existing  chemicals.
The products of this  program  yield  the  technical  evaluations  and analyses  for
making regulatory   decisions  on  the need for testing particular  chemicals  and
controlling new and existing chemicals.

     The TSCA  testing  effort  1s  concentrated on  test rule  and test  guideline
development.   TSCA  requires  EPA to  respond to   Interagency  Testing  Committee
(ITC) recommendations  on  chemicals  or  chemical  classes   within  12  months  of
receipt of those  recommendations.   The response  must be a decision whether  or
not to require testing  and,  if so, to promulgate proposed  and  final  test rules.
In addition  to such  a regulatory  approach,  this  program  supports  efforts  to
negotiate voluntary agreements  with  industry to  test chemicals.  This  nonregu-
latory approach results  in  a  quicker start for  testing.   The program also  sup-
ports development  of  scientifically  valid testing  guidelines.   The  test  guide-
lines are developed to be consistent with those used In this  country  to  regulate
pesticides and  with  recognized International  guidelines.   They  are  reviewed
annually and updated as  necessary.   These nonregulatory guidelines are  expected
to provide a proper balance between obtaining  the necessary quality, accuracy,
and consistency in  test data  and  allowing  industry  sufficient flexibility  for
innovation.

     In the area of new  chemicals, the  focus  1s  on health  and environmental  risk
assessments.   Every new chemical is  prescreened  by EPA prior to its manufacture.
The number of Premanufacture Notifications continues to rise, which  means  increas-
ing demands for evaluating risk  potential.   When sufficient data are  not  avail-
able, judgments about potential risks are derived from analyses of data  on  chem-
icals with closely  related  structures  or  properties.   This  structure/activity
analysis also 1s used  to  resolve requests  for  exemptions  from  requirements for
Premanufacture Notification,

     In addition,   this program  Is  concerned with existing chemicals.   Here,
the aim is to Identify existing chemicals of  greatest  concern and  evaluate  their
risks from all  sources  of  exposure.   Where  necessary, this  program  provides
detailed assessments  to  estimate  the  risk  reduction  that  might  be  expected
from particular changes in the manufacture, processing, or  use  of  a  chemical  and
to support regulatory  decisions if unreasonable  risks  cannot be  mitigated through
voluntary measures.
                                      TS-38

-------
     Chemical Control —  This  program  uses regulatory  and nonregulatory  tools
to encourage  industry  to identify  and  control  unreasonable risks  from new  and
existing chemicals.  Thus,  all  ruleraaking  under  Sections  5  and 6  of TSCA  is
conducted in  this  program.   Efforts supporting  rulemaking also  included  here
are industrial  chemistry,  chemical  engineering,  economic, and  regulatory  impact
analyses.  When a  chemical  is  identified as posing  unreasonable risk, options
for controlling this risk must be  developed and  evaluated  before a rule can  be
prepared.  Industrial chemistry  and chemical engineering analyses determine  how
risks might  be reduced  where they  occur  in  manufacture,  processing,  use,  or
disposal.  Economic  and  regulatory  impact  analyses  generate  information on  the
costs and regulatory impacts of various  risk reduction alternatives.

     The importance of introducing new chemicals  into commerce  and the  increasing
number of  new chemical  submissions make the  Premanufacture  Notification  (PMN)
program a  very high priority.   Resources  in  this program provide  the manage-
ment for the entire PMN  review process, including  coordination with  industry,
and develop  regulatory and nonregulatory actions where needed.   Work included  in
this area  also involves  development of exemption  rules  and Significant New  Use
Rules.  Exemption rules implement those  provisions of TSCA  designed to ease the
industry burden by eliminating the need to  submit for review new  chemicals  which
pose no unreasonable risk.  The  current  Significant  New  Use Rules program  deals
with new chemicals  originally  intended  for uses resulting  in  limited  exposures,
which might be hazardous  if used differently.  Under a Significant New Use  Rule,
however, the  manufacturers  must submit  a Premanufacture notice to EPA prior  to
Introducing such chemicals for  significantly different uses or uses that  result
in increased exposure.

     In the area of existing chemicals, the focus is on answering three  questions:
does the chemical present  an unreasonable risk, what Is the source of  the unreason-
able risk, and what is the most efficient, cost-effective  approach to  reducing
such a risk?  When analysis of  potential  hazards leads  to  a determination that
an unreasonable risk exists, and the most appropriate way to reduce or minimize
that risk  has been  identified,  the  Agency will  promote  voluntary  actions  by
chemical manufacturers, processors  and  users to  control the  problem.   If  these
efforts fail, EPA  will  identify the most appropriate regulatory  approach.  When
TSCA is the  most appropriate  statute,  regulatory activities  are undertaken  in
this program area.

     TSCA Information —  This  program  includes  all   the information  collection
and Information management activities needed to  implement TSCA.  Thus, the work
covered in this program provides essential  support to all  other  efforts related
to meeting the requirements of the statute.

     Systems are maintained  for  secure  handling  of confidential  business  In-
formation,  collection and statistical analysis of environmental  monitoring  data,
and development  and implementation  of  rules  for reporting  and  recordkeeping
under TSCA Sections 8 and 12.

     Information systems  also  receive,  store,  and provide  ready access to  data
necessary for  assessment and  control  activities.   A  considerable   amount   of
information Is  needed  for  assessments  of both existing chemicals  and  the
large number  of new chemicals.   On-line  systems are used for  the  literature
searches conducted  for  each new Premanufacture   Notice  entering initial   review
and for  chemicals   whose  structure  or  properties  are  closely  related  to the
new chemical   to  provide  a  basis for  analyzing  risks  and future  exposure  po-
tentials.

     This program  also  includes the processing  of  all  data  received   under
TSCA.  For example, the  Chemical  Inventory includes  over 85,000 submissions
on over 55,000 chemicals.  An  on-going  effort   Is  required  to  update the  In-
ventory and  clarify the  chemical  data  submitted.   Many data  elements  in the
Inventory require  special handling  as confidential business information.   Hand-
ling of confidential  business  information  Is an important aspect  of the pro-
                                      TS-39

-------
gram that  becomes  more  complex as  the  amount  of  Information Increases.   This
program also includes the liaison function with  the chemical  industry  on  matters
of mutual concern regarding toxic substances control.

     Toxics Integration—  This  program  Includes (1)  1ntra-Agency Integration
of chemical-by-chemicat   regulatory  programs  and activities;  (2)  operation  and
enhancement of  the  Chemical  Substances   Information  Network  (CSJN);  (3)  coor-
dination of  EPA chemical  activities  with  other  countries  through  the  Organ-
ization for Economic  Cooperation and Development (OECD) and  other  international
organizations; and  (4)   assistance   to  States   and  localities  in establishing
new toxic substances control programs and In  coordinating  and Integrating exist-
ing programs to promote more effective operations.

TESTING AMDEVALUATION

1981 Accomplishments

     In 1981,  the  Agency   obligated  $Z5,167,600  of  which  $6,842,900  1s  for
Salaries and Expenses and $16,324,700  is  for  Abatement, Control and Compliance.
EPA received two  Interagency Testing  Committee  (ITC)   lists  for  development  of
tests for seven chemicals or categories.   Responses  to 11  previous ITC designa-
tions were  published  as part  of an  effort  to  meet  a court-imposed  schedule.
Three test  rules  were proposed.  The  Agency  published six test standards—five
for chemical, physical and persistence characteristics, and one far good  labora-
tory practice.  A total  of  581  new chemicals were  prescreened.   Of  these,  478
new chemicals  required   initial  review.   Detailed  reviews  were  completed  for
26 new  chemicals  and  resulted  in  either  withdrawal   of  the  chemical  by  the
manufacturer or a decision  to  allow the  chemical to  be manufactured.  Chemical
hazard Information profiles  were  developed for  37  chemicals.  Four preliminary
risk assessments for  existing  chemicals  were completed and  are currently  being
used in making  decisions  on whether to attempt  voluntary  or mandatory control.
A risk assessment for asbestos  1n schools  was  completed.

1982Explanatlon of  Changes fromJanuaryBudget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                    $30,521,300     $26,806,500      $17,859,700

     The net decrease of -$12,661,600  results from  several actions, as follows:

     ~  ^jyffSLcJlarch.   (-$3,714,800)   This change  represented  a decrease  of
     $3,7r4",'SOO"Trom" the January budget,  of which $759,400 was for Salaries  and
     Expenses and $2,955,400 was for Abatement,  Control and  Compliance.   Output
     decreases in the area of scientific  risk assessments  of  existing  chemicals.

     -  Reprogramming.  {-$416,100)   This  transfer of $280,900 into TSCA Informa*
     tion consolidates rent,  communications,  and utilities   for ADP  rental  and
     leases to  produce  economy through centralized  control.   The  reprograimrfng
     of $10,200 Into chemical  control  supports  costs  for  maintenance  agreements
     for ADP  and  word processing  equipment.   (This reprogramnring of  -$291,100
     was Included in the letter to  Congress  on  December 16, 1981).   During  the
     development of  the  operating  plan,  several  miscellaneous reprogrammlngs,
     which are  not  reportable  to Congress, were made  to  this  activity  and  re-
     sulted in a net decrease of -$125,000.

     -  Congressional  Actions.    (-$8,530,700)   A reduction   of  -$8,530,700  was
     taken against the march request reflecting  the September 12S reduction to
     the Abatement,  Control  and Compliance appropriation.   This reduction  will
     eliminate a substantial part  of a program  designed to  allow  the Office  of
     Toxic Substances to  more  accurately  and economically predict human health
     and environmental effects  of chemicals without the need  for extensive test-
                                     TS-40

-------
     ing.  The  projects  reduced include  those  creating  chemical  data bases  on
     comparative toxicology,  modeling  methods,  and  extrapolation   techniques.
     Eliminated are some projects that develop and validate better and more cost-
     effective human and environmental  exposure methodologies,  model  and/or data
     bases.  These projects  enable  EPA to evaluate,  more confidently, the  need
     for testing and/or control of existing chemicals.

1982 Program

     In 1982, the Agency 1s allocating a total of $17,859,700 and 193.6 permanent
workyears to this program,  of which $7,647,500  1s for Salaries and Expenses  and
$10,212,200 Is for extramural  purposes under the Abatement, Control and Compliance
appropriation.  The  program will comply with  the  court-Imposed  schedule to clear
the backlog of  responses to ITC  recommendations and  respond to  new ITC recommen-
dations in a  timely manner.  It is estimated that careful consideration of  risk
data will  lead  to decisions  not to  test  for 10  chemicals or  chemical classes,
that test  rules  will  be  proposed  for  nine  chemicals or  chemical classes,  and
that three test rules will  be published in final  fora.  EPA  will  also  publish  30
test guidelines.  In  the area  of new chemicals, 560 Initial reviews and  25 detailed
risk assessments  will  be  required  on  the 800  notices  submitted prior to  manu-
facture.  Projections for existing  chemicals  are: 35  chemical  hazard  Information
profiles; three preliminary risk assessments; and 75 reviews  of substantial  risk
notices.  Only those existing chemicals indicating  a possible  unreasonable  risk
will be  reviewed  beyond  this  level   In preparation  for  voluntary/mandatory
control s.

1983 Program Request

     The Agency requests  a total  of $19,515,800 and  174.9 permanent  workyears
for this program, of which $6,652,100  is for the Salaries  and Expenses  appro-
priation and  $12,863,700  1s  for the Abatement,  Control   and Compliance  appro-
priation.  This  1s   a decrease  of $995,400 and  an  increase  of  $2,651,500,
respectively.  The decrease reflects completion of much of the  basic  test  guide-
lines development work.   The  change in  extramural  support  will  maintain  con-
tinuity in developing  and  implementing the  testing  program  under Section 4  of
TSCA.  In  the area  of test  guidelines,  emphasis  is shifting from  guidelines
development to  annual  review, as guidelines  for major health  and environmental
effects are  completed.   The  testing program  will publish test guidelines  pre-
viously developed or needed  for particular  chemicals  or  chemical  classes  in
upcoming test rules.   Efficiencies  In  the  test rule development process  will
enable the Agency to continue to meet the court-imposed schedule  as  well  as the
statutory time  limit  for  responding to  ITC designations.   If  the  efforts  to
negotiate voluntary testing agreements  with  Industry are  successful,  the  Agency
expects to fulfill its testing mandates  In advance of the  schedule.

     The number of new chemical  notices is expected  to reach approximately 1,000
In 1983.   Of these,  400  will  be  identified  in  the prescreen  as  posing  no
unreasonable risk and will  be quickly exited  from the process.   600 will  require
initial review activities and 40 will require detailed review.   Approximately  10
evaluations of  exemption  rule  petitions will   be   completed  for  classes  of
chemicals currently  requiring premanufacture  review.

     Existing chemical  activities  will  focus  on the  careful  Identification  of
chemicals for assessment  to  ensure  the most effective use  of resources.   This
focus will necessitate fewer preliminary risk assessments.   Finally, risk  notifi-
cations received  under  Section 8 of TSCA will be  evaluated promptly, followed
up, and made available to the appropriate EPA office  for  action.

CHEMICAL CONTROL

1981 Acc ompl1shments

     In 1981, the Agency obligated $10,885,700 of  which $4,327,100 1s for Salaries
                                      TS-41

-------
and Expenses  and $6,558,600 is  for Abatement,  Control and  Compliance.   A total
of 581 Premanufacture Notifications  were  received.   Two  were withdrawn and eight
were  suspended  as a result of initial or  detailed  review.   A total  of 41  test
market exemption  requests  were resolved,  with 38 of these being  granted.  Three
industry profiles  and  one market  profile  were produced  to support  voluntary/
mandatory control efforts.   Six  preregulatory analyses were  completed  for exist-
ing chemicals,  and  six  exemption requests  dealing with  chlorof1uorocarbons  were
resolved.

1982 Explanation of Changesfrom January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                    $12,401,400     $11,487,600     $10,256,700

     The net  decrease of -$2,144,700  results  from several  actions, as  follows:

     •  January - March.   (-$913,800)   This  change  represented  a  decrease  of
     $913,800 from  the  January budget, of  which $763,800 was for  Salaries  and
     Expenses and $150.000 was  for Abatement,  Control  and  Compliance.   Output
     decreases  in the  development  of  regulatory  analyses supporting  rules  that
     control existing chemicals.

     "  Reprogram«ring•    (-$125,800)   An  Agency-wide  reprogramrning   of -$136,000
     provldes resoufc-es  for transfer of the accountability function  to  the Office
     of Management  Systems and Evaluation  and, in addition, provides  additional
     resources  for the Immediate  Office of  the Assistant Administrator for Solid
     Waste and  Emergency Response.  A second reprogramnring of+$10,200 into chemi-
     cal Control  supports  costs for  maintenance  agreements  for ADP and  word
     processing equipment.   (These  two reprogramnrlngs  totalling  -$125,000  were
     included in a letter to Congress on December 16, 1981).

     -  Congressional Actions.  (-$1,105,100)  An additional  reduction  of
     -$1,105,100 was applied to the  Salaries and  Expenses  ($105,100),  and Abate-
     ment, Control  and  Compliance  ($1,000,000)  appropriations  to meet Congres-
     sionally mandated appropriation levels.

1982 Program

     In 1982, the Agency Is allocating a total  of $10,256,700 and 138.3 permanent
workyears to this program,  of  which $4,782,800  Is for Salaries and  Expenses  and
$5,473,900 Is for extramural purposes under the Abatement,  Control and  Compliance
appropriation.  These resources  are being  used  in  both  the areas of  new  and
existing chemicals.   It  is expected that the number  of PMN's  to   be addressed
will approximate 800.   Work  in  this  program  will  also  resolve  five exemption
applications under TSCA  Section  5,  and 60 test market exemptions.   Six  Signifi-
cant New  Use  Rules  will  be  developed allowing the  manufacture  of potentially
hazardous chemicals in  small quantities for strictly  limited use.

     In terms of  existing  chemicals, EPA  expects to promulgate a total  of seven
proposed or final rules.  One of these  will be a rule  requiring identification
and notification of  the  presence of asbestos  in  public  and private schools,  as
previous voluntary  programs failed  to achieve adequate  coverage.   Further,  as
mandated by the  statute and  court order,  the Agency  is  developing rules  on
polychloHnated biphenyls (PCBs).  These will include  rules  to define  which  uses
are totally enclosed and  therefore exempt from the  statutory  PCB ban  and  to
determine at  what concentration a  PCB is  defined to  exist (e.g.,   50 parts  per
million or less).  This  program is also developing a  regulatory decision document
for chlorof1uorocarbons.   The  program  will conduct  preregulatory   analyses  for
three existing  chemicals  Indicating  potential  unreasonable  risk  and  process
three exemption requests based on rules promulgated under Section  6.
                                      TS-42

-------
1983 Program Request

     The Agency  requests  a  total  of  $8,336,900  and 136.7  permanent workyears
for this program,  of which $4,618,000 is  for the Salaries  and Expenses appro-
priation and $3,718,900 is  for the Abatement,  Control  and Compliance appropri-
ation.  This is  a decrease of $164,800  and  $1,755,000,  respectively.  Resource
savings reflect  increasing  emphasis  on  developing  voluntary  control  actions
for existing  chemicals  of  concern.   Fewer  resources  will   be used  for  risk/
benefit options  analysis,  regulatory analyses  and  rule  development  because
the voluntary approach to control  will  negate  the extensive  cost of regulation
development while  stimulating  the  impacted  industry  to develop  cost effective
approaches to chemical  control.

     New chemicals and their review  before manufacture will  continue to  be the
highest priority  in  this  program,  and resources  are  allocated  to  handle 1,000
Premanufacture Notifications expected  during  1983.   In  addition,  efforts  will
continue to make  the review process  itself  more  effective and efficient.   One
Significant New Use Rule  will be proposed.   Test  market exemptions will be pro-
cessed at the same rate as in 1982, in compliance  with the TSCA time limit of 45
days.  Finally,  it is  expected  that  10 exemption  requests  will   be  reviewed
and/or resolved for  classes  of compounds currently requiring premarket notifi-
cation prior to manufacture.

     Emphasis will be  focused  on  identification  of possible voluntary control
actions for existing chemicals of concern.  Resources are planned to produce the
analyses which would  serve as the basis  for these  control  actions.  Although
voluntary action on the part of the regulated community is preferable, two final
rules under TSCA Section 6 are  anticipated.

TSCA INFORMATION

1981 Accomplishments

     In 1981,  the Agency  obligated  $17,069,100   for  this   activity  of  which
$5,792,300 1s for Salaries and  Expenses and $11,276,800 is for Abatement, Control
and Compliance.  Five reporting and recordkeeping rules were published  in proposed
or final form.   Those  rules  covered asbestos, import policy,  notification  of
export, polybrominated  biphenyls  (PBBs) and Tris, and  the  small business exemp-
tion.

1982ExplanatipnofChangesfrom January  Budget  Estimate

                     January          March          Current
                     Estimate       .Estimate        Estimate

                   $19,559,300      $12,426,400     $10,290,200

     The net decrease of  -$9,269,100 results from  several  actions, as follows:

     -  January - March.   (-$2,797,100)  This  change  represented a decrease  of
     $2,797,100 from the January budget,  of which  $1,364,600 was for Salaries and
     Expenses and $1,432,500 was for  Abatement, Control  and  Compliance.  Output
     decreases in the development  of recording-keeping and reporting rules  and
     scientific data base  development.

     "  Restructuring.   (-$4,335,800)  These  resources  were  moved to  the  new
     program element entitled Toxics Integration  in order  to  reflect the separ-
     ation of  information  and integration activities.   Under  this structure a
     separate program unit is created  which  will cover  coordination and inte-
     gration of Agency,  intergovernmental and  international activities concerning
     toxic substances.   The  remainder  will  coyer the  following  activities:  1)
     gathering of Information  from industry  for  the  purposes  of assessing  and
     regulating chemical  hazards;  and   2)  the  establishment  and use  of infor-
                                     TS-43

-------
     mation storage  and retrieval  systems  to  support  Implementation of  TSCA.

     "  rc^Pj^ograiTOing.   (+$247,500)  The transfer of +$280,900 into TSCA  infor-
     mati^ff ^consolidates  rent,  communications,  and  utilities for  ADP  rentals
     and leases  to produce  economy  through  centralized control.   There  1s  no
     impact on  the  testing  and  evaluation program  as  this  transfer  simply
     reflects a change in where these funds will  be obligated.

        An Agency-wide reprogramming of  -$33,400 provided  resources  for transfer
     of the accountability  function to  the Office of Management Systems  and  Evalu-
     ation and,  in addition,  provided  additional  resources  for the  Immediate
     Office of the Assistant Administrator for Solid Waste and Emergency Response.
     There is no  significant Impact  on the  losing  program  activities since their
     remaining resources are  sufficient  to  support personnel  and  planned activi-
     ties.  (These two  reprogrammings,  totalling  +$247,500  were included  in  a
     letter to Congress on December 16, 1981).

     -  Congressional Actions.  (-$2,383,700)  An  additional  reduction  of
     -$2,383,700 was applied to the Salaries  and Expenses  ($785,000),  and  Abate-
     ment, Control,  and  Compliance ($1,598,700)  appropriations to meet Congres-
     sional ly mandated appropriation  levels.

1982 Program

     In 1982, the Agency Is  allocating a total of $10,290,200 and 67.7 permanent
workyears to this program,  of which  $4,357,700  is  for Salaries and  Expenses and
$5,932,500 is for extramural purposes under the Abatement,  Control and  Compliance
appropriation.  It  is  expected  that  one  chemical-specific  reporting rule  and
two recordkeeping and reporting  rules  will  be proposed, and  two  such  rules  will
be promulgated in final  form.   The rules will require submission of information
such as exposure  to chemical  candidates for testing or  possible  control,  and
results of unpublished health and safety studies.

1983 Program Request

     The Agency requests a  total  of  $7,954,600 and 57.7 permanent workyears for
this program, of which $4,494,600  is for the Salaries and  Expenses appropriation
and $3,460,000 is for the  Abatement, Control  and  Compliance appropriation.   This
represents an Increase  of  $136,900 and  a  decrease  of $2,472,500, respectively.
The Increase reflects increased expenses 1n operating data  systems.  The decrease
in extramural  funds  reflects reductions   in  information   systems  development,
enhancement and expansion.   Contractor support to the  Industry Assistance  Office
1s discontinued.

     Support will  be  provided  to  review  10  exemption  requests  in  the   new
chemical area, and to the  risk and economic assessments planned  in  the existing
chemical area.  It  1s expected  that increased amounts of confidential  business
information will  be  handled.   However,  due  to  management  efficiencies,   the
operation will  be  maintained with the same level  of  resources as  1n  1982.   As
the rate of  Premanufacture Notification submissions Increases, a greater  number
of inquiries  and  submissions  will  be processed.   Exposure-related  Information
collected under TSCA will be analyzed and made available  to EPA users.   A limited
number of reporting rules will be issued to  support specific chemical assessments
for TSCA and  other  programs.  Finally, efforts will  be  sustained to  streamline
processes for developing and retrieving the masses  of data  needed  to  successfully
implement TSCA.

TOXICS INTEGRATION

1981 Accomplishments

     In 1981, the Agency obligated $4,716,300 of which $1,453,900  is  for Salaries
and Expenses  and  $3,262,400 Is  for Abatement,  Control and Compliance.  A major
                                     TS-44

-------
focus of  activity was  improved integration  of EPA,  Federal,  State  and  inter-
national activity  on  toxic chemicals.   Analyses  were completed  on  the Agency's
contracts process,  existing  integration  mechanisms, inconsistencies  in  current
toxics-related programs,  and  alternative approaches  to  reducing  the  regulatory
burden on industry.   Cross-media risk assessments,  control  option analyses, and
economic analyses  were  evaluated as vehicles for integration of  Agency chemical
control efforts.   Intermedia  Priority Pollutant  (IPP)  guidance packages  were
produced for  use  by EPA  and  State programs.   These  packages describe principal
effects, exposure routes, monitoring technologies, regulatory status and remedial
actions for 19 high-priority chemicals.  Program personnel chaired  and staffed six
Agency chemical  workgroups (e.g.  dioxins,  solvents) which  resolved cross-media
issues,  this  successful  approach  has been adopted  for  continued  toxics  Inte-
gration.  Other  integration  activities  included:  maintaining  the  toxics  Inte-
gration chemical  data  base and  using it to provide  data  and analyses to  other
EPA programs  and  States;  providing  leadership staff  and  analytic  support  to
Agency and  Interagency  workgroups dealing with integration  problems;  developing
an Agency  control  option  strategy  for  arsenic;  and developing a  conceptual
framework for establishing Agency-wide priorities  for chemicals of Agency concern.

     To coordinate United  States  toxic  chemical  control  efforts with those  of
other countries, the program took part in multilateral and bilateral negotiations.
Through these  negotiations,  the  United  States  hopes to  limit  potential  trade
barriers, thus promoting  export of chemicals and  reducing the  cost  of  United
States government  and  industry  compliance  with  environmental   requirements  of
other nations.  Program staff led  the United States delegation to the Organiza-
tion for Economic Cooperation  and Development (OECD)  Chemicals Group which reached
international agreement on testing protocols,  worked toward agreement on  con-
fidential business  information exchange  between  governments,  helped  construct
and develop  an  International  mechanism to  update  test guidelines,  .and assisted
in establishing mechanisms  to ensure  compliance  with good  laboratory practices
(GLP) guidelines.   Bilateral  negotiations  resolved  the PCB  waste  export  issue
with Canada.  Other activities  Included  directing  United  States participation  in
multinational safety and  chemical  Information  exchange programs and  notifying
Importing countries of TSCA actions as required by  the TSCA Section 12(b)  export
notification requirements.  The program also worked  with the  United States Trade
Representative to  assure  consistency  between  TSCA  and  Federal  Insecticide,
Fungicide, and  Rodenticide Act  (FIFRA)  requirements  and  the  Trade  Agreements
Act of 1979.

     During 1981,  the   program  Initiated  testing  of  the  Chemical  Substances
Information Network (CSIN)  prototype.  Ten  organizations  were trained as  CSIN
users and four Independent chemical Information data bases were  made  accessible
through CSIN to these  groups  by the  end of the year.   A user  support services
system was also developed.

     Through the  award  of  grants, EPA provided  technical  assistance  to  States
establishing toxics programs  or  integrating  existing programs.    Grant  awards
Included three  to states  under TSCA  Section 28  authority, three  establishing
States/localities as  CSIN  pilot  users  and one  to  the  National  Governors'
Association to provide assistance to  States, coordinate State toxics integration
efforts, and provide CSIN access  to  States.   In  addition,  EPA  continued  over-
sight of eight previously awarded Section 28 grants.

1982Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                    $4,335,800      $3,308,300

     The net Increase of  +$3,308,300  results from  several actions, as  follows:

     "  Restructuring.   (+$4,335,800)   These resources have  been moved to  this
     program element from  Information/Integration in  order to reflect  the  separ-
                                     TS-45

-------
     ation of  information and  integration activities.   Under this  structure  a
     separate program  unit  is created  which will  cover coordination and  Inte-
     gration of Agency, intergovernmental and international activities concerning
     toxic substances.

     "  Repfogrammlng.  (-575,000)  During the development of the operating plan,
     several miscellaneous reprogrammings, which are  not reportable to  Congress,
     were made  to  this activity  and  resulted  in  a  net  decrease of  -$75,000.

     -  Congressional Actions.  (-$952,500)  A  reduction of -$722,400 was  taken
     against the March estimate  reflecting  the September  12S reduction to  the
     Abatement, Control and  Compliance appropriation.  This reduction in  extra-
     mural funds will  delay development  and  implementation  of  an  Agency  strategy
     for integration  of toxic  substances  activities,   This action will  reduce
     the development  of Agency  options to  control  health and/or environmental
     effects from chemicals.   All  1982 contract support to test  proposed  priority-
     setting concepts has been eliminated.

     An additional  reduction  of  -$230,100  was  applied  to  the  Salaries  and
     Expenses ($4,800) and Abatement, Control  and Compliance ($225,300)  appropri-
     ations to meet Congressionally mandated appropriation levels.

1982 Program

     In 1982, the  Agency  is  allocating a total  of $3,308,300  and 29.0  permanent
workyears to this  program  of  which $1,389,200  is  for  Salaries and  Expenses
and $1,919,100  is  for extramural  purposes  under the  Abatement,  Control  and
Compliance appropriation.   Integration activities during 1982  focus on  chairing
and staffing Agency  chemical  workgroups to coordinate chemical control  actions.
In addition to  maintaining  and updating the  IPP guidance packages  produced  and
distributed in  1981,  the program  will  complete  four   new  and  eight  revised
packages.  Alternative  procedures for  establishing  Agency  chemical priorities
will be completed  to systematically  identify and address those chemicals  posing
the most significant public  health and environmental concerns.   Existing  chemical
regulatory status  files and  a  related  Industry-chemical use  file will  be  used
to analyze the  burden imposed on industry by  existing  or anticipated  chemical
regulations.

     The program will  continue to work  through the  OECD and  other multilateral
groups to  represent  United  States   toxic  control   and  integration  policies*
Building on previous  agreements,  the United States delegation to the OECD  will
continue to work toward implementation and enforcement of  good laboratory  practice
principles; principles of hazard  assessment; key  terms  and definitions  related
to chemical regulation; priority setting methods for selecting  existing chemicals
for testing; and exchange of information between governments,  including principles
governing the exchange  of confidential  information.   The program will   continue
to support  multinational  chemical  safety  and  information  programs, the  United
States Trade Representative and TSCA  Section 12(b) export notification responsi-
bilities.

     EPA will test the CSIN  user support system,  evaluating  and enhancing  the
system based on user comments and needs.   Several  new  resources and 25 additional
users are  projected  to come  on line during  1982.   Emphasis  will  be placed  on
bringing private sector users into the system and on  completing and implementing
a user-charge system.

     Work with  States  to promote  integration  of State  toxics  programs  will
continue.  Case studies highlighting the model  elements of evolving integrated
toxic management programs will  be developed.   State  legislative   and regulatory
initiatives will be tracked to determine trends and assess the cumulative Impact
of toxics  controls on Industry.  EPA will  continue oversight of  projects  being
conducted under previous  grant  awards,  emphasizing evaluation  of CSIN  services
to its  private  sector  users  and information  exchange  among  States  based  on
Section 28 project assessments.
                                      TS-46

-------
1983 Program Request

     The Agency requests a  total  of $3,515,000 and 21.0 permanent  workyears for
this program, of which $1,161,600  is  for the  Salaries and  Expenses  appropriation
and $2,353,400  is   for  the Abatement,  Control  and  Compliance  appropriation.
This is a  decrease  of $227,600 and an  increase of $434,300,  respectively.   The
Salaries and Expenses  appropriation decrease  reflects  a targeting  of  effort to
the highest priority areas.   Extramural  increases will  allow expanded  analysis of
cross-media chemical regulatory Issues in support of chemical  work  groups.   This
program will chair  and staff ad hoc  chemical  workgroups to  promote  Integration
of major  chemical   control  activities.   Other  integration activities  include:
improving Agency cost-effectiveness analyses and  priority setting and  Information
gathering mechanisms; maintaining the existing Intermedia Priority Pollutant  (IPP)
documents and updating  or producing 8 IPP documents; updating chemical and industry
data bases; and  performing  chemical studies and analyses  using these  and  other
data sources.

     The program will  continue to  lead  the United States delegation  to the  OECD
Chemical Group and  participate  in  negotiations  on:  Internationally  coordinated
export notification  requirements  for  chemicals; updating test  protocols; estab-
lishing priorities  to  further  investigate existing chemicals;  and  International
sharing of testing  burdens.  International chemical  safety  and information  shar-
ing activities,  support  of the  United  States  Trade  Representative  and export
notification under  Section 12(.b)  of TSCA will continue.

     The 1983  request  provides  for  expansion  of  CSIN  capabilities  including
increased processing capabilities,  improvements  to user support operations (train-
Ing manuals, system  documentation), and conduct of hardware, software,  and  user
evaluations-  A  user charge  system  will  begin  to  support  system  operations.

     Assistance to   States during  1983 will  concentrate on  maintenance  of infor-
mation data  bases   and providing  technical  assistance to  States establishing
toxics management programs.   The  program will  continue  Its  oversight  of projects
being conducted by  States under previously awarded  grants  and assist  in exchange
of information generated by  such  projects.
                                      TS-47-

-------
Page Intentionally Blank

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                           TOXIC SUDSTAHCES

                                     Toxic Substances Enforcement
                                     ACTUAL
                                      1981
                       JANUARY
                       ESTIMATE
                         1982
                        MARCH
                       ESTIMATE
                         1982
          CURRENT   ESTIMATE INCREASE +
          ESTIMATE    1983   DECREASE -
            1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSAHDS)
Toxic Substances
Enforcement
 Salaries & Expenses
 Abatement Control *
 Compliance

Toxic Substances
Enforcement Grants
 Abatement Control *
 Compliance
           $2,450.2   $4,032.0   $3,218.0   $3,289.4   $2,425.9
           $1,568.6   $1,034.4   $1,034.4     $697.6     $207.0
           $1,000.0
            '$500.0
$500.0     $500.0
                                                       -$863.5
                                                       -$490.6
-$500.0
TOTAL:
 Salaries S Expenses
 Abatement Control ft
 Compliance

Toxic Substances
Enforcement
TOTAL
           $2,450.2   $4,032.0   $3,218.0   $3,289.4   $2,425.9   -$863.5
           $2,568.6   $1,534.4   $1,534.4   $1,197.6     $207.0   -$990.6
$5,018.8   $5,566.4   $4,752.4   $4,487.0   $2,632.9 -$1,854.1

-------
      TOXIC SUBSTANCES

Toxic Substances Enforcement

ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
 1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
            1982       1982       1982            1983 VS 1982



—1
1
*»
to


PERMANENT FULL-TIME WORKYEARS
Toxic Substances
Enforcement
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Toxic Substances
Enforcement
TOTAL WORKYEARS

63.7 Til .2 92.7 88.5 63.9 -24.6
63.7 111.2 92.7 88.5 63.9 -24.6

81.6 119.9 100.0 95.5 64.6 -30.9
81.6 119.9 100.0 95.5 64.6 -30.9

-------
                                 TOXIC SUBSTANCES

                           Toxic Substances Enforcement

Budget Request

     The Agency requests a  total  of $2,632,900 and 63.9 permanent  workyears for
1983, a decrease of $1,854,100 and  24.6  permanent  workyears  from 1982.   Included
in this total is $2,425,900 for Salaries and Expenses, and $207,000 for Abatement,
Control, and Compliance, with a  decrease of $863,500 and a  decrease of $990,600
respectively.  The reduction  in  resources for this subactivity  is  attributable,
in part, to  a  reorganization  within the Agency of enforcement responsibilities.
Legal activities have been transferred to the new Office of Legal and Enforcement
Counsel.  Remaining reductions reflect resource  savings  achieved by locating all
compliance monitoring  activities  in the  Regions  and  by the  completion of the
toxics enforcement grant program in 1982.

Program Description

     This subactivity supports all compliance monitoring and compliance assistance
activities under the  Toxic  Substances Control Act (TSCA),  including support to
the regulation  development  effort  and  financial   assistance  programs for  State
involvement in toxics control  efforts.

     ToxicSubstances Enforcement —  The  toxic  substances  enforcement  program
ensures 'cbnpll arice with  YSCA  rules and  regulations.   Headquarters  and  Regional
offices play distinct but complementary  roles  in  the  program's operation.  Head-
quarters provides enforcement support to  the TSCA regulatory  development process;
designs, Implements, and oversees compliance monitoring  activities  by developing
guidances, Strategies and procedures; and provides  technical compliance assistance
and technical support to case development and prosecution activities.

     Regional offices  respond to  special  risk   situations;   Inspect  facilities
that manufacture,  process,  distribute   or use  new  or  specifically  regulated
chemicals; and  monitor laboratories  performing  tests pursuant  to  TSCA  testing
rules or voluntary testing  agreements.  Regional offices also assist the regulated
community in complying  with all applicable TSCA  regulations and seek  voluntary
remedial action in lieu  of enforcement prosecution where appropriate.   In  cases
where voluntary compliance  is not  achieved,  Regional  personnel provide  technical
support to case development and prosecution activities.

     ToxicSubstgnces Enforcement Grants  — The major  function of this program is
to provide  States  with  financial  assistance to  stimulate  development of  model
demonstration programs for chemical  control.

TOXIC SUBSTANCES ENFORCEMENT

1981 Accompjishmejits

     In 1981, the Agency obligated $4,018,800 of  which $2,450,200 is for Salaries
and Expenses and $1,568,600 is  for  Abatement,  Control and  Compliance. Extramural
funds provided  compliance  inspection support,   chemical  analysis  of  samples,
and revision  and  development of  compliance  strategies.   Compliance  monitoring
strategies were  completed   for  Section 8(a) polybrominated  biphenyls(PBBs)/TRIS
and Section  6 Dioxin  rules.   Assistance  was provided  to the  Office of  Toxic
Substances in the  development  of new regulations,  including  test  guidelines and
good laboratory practice  rules  for health effects testing,  a chemical  control
rule for  asbestos in  schools,  and draft ecological effects test  guidelines.
Enforcement staff developed inspection procedures for  ecological  effects testing,
and a  compliance monitoring  strategy  for Section 4.   Headquarters staff  also
assisted the  Regional  Offices in developing  and  prosecuting  enforcement cases.

     Regional office  staff  responded  to  special  risk incidents,  Inspected  poly-
                                      TS-50

-------
chlorinated biphenyl   (PCB)  and  chlorofluorocarbons  (CFC)  establishments,  con-
ducted compliance  monitoring  activities  to  support  Section  5  premanufacture
notification review and  Section  8(e) substantial  risk  notification,  and  devel-
oped and  prosecuted  enforcement  cases   upon  detection  of  serious  violations.
Administrative orders  were issued in 115 cases.

     Both Headquarters and  Regional  staff also  participated In the  preparation
of numerous imminent hazard cases involving illegal  storage, disposal,  handling,
or treatment of chemical  substances.

1982 Explanation of Changes frog[January Budget  Estimate

                    January          March           Current
                    Estimate         Estimate         gstimate

                    $5,066,400      $4,252,400      $3,987,000

     The net decrease  of -$1,079,400 results from several  actions, as  follows:

     -  January-March.    (-$477,500)   This change  represented  a  decrease  of
     $477,500 frOm the January budget, all of which was  for Salaries and Expenses.
     Section 6 asbestos inspections, Section 5  new chemical  Inspections, inspec-
     tions at ports-of-entry  and  at those facilities  subject to Section  4  test
     rule requirements will  be  somewhat limited.   Regional support  for  State
     grants, ADP  maintenance, and   public  participation at  outreach  programs
     will also be limited.

     -  Reorganization.   (-$336,500)  These resources  were  moved to  Technical
     Support -  Office of  Legal  and  Enforcement  Counsel  -(National  Enforcement
     Investigation Center - NEIC).   The functions supported by these  resources
     remain the same;  the  new program element  for NEIC was  created,  (a) so  that
     its resources could  be more readily  Identified and,  (b)  organizationally,
     the center now falls under the  responsibility  of the  Office of Legal  and
     Enforcement Counsel.  As  a  result of an agency restructuring these resources
     were later moved  to  the Interdisciplinary program under one program element.
     This change reflects the  consolidation  of  similar  activities providing quick
     technical response in emergency situations.

     -  Reprogramming. (+$181,900)  During the development of the operating plan,
     several miscellaneous reprogrammings,  which are not  reportable to  Congress,
     were made to  this activity and  resulted   In  a  net  Increase  of  +$181,900.

     -  CongressionalActions.  (-$450,700)   A  reduction  of -$206,100 was taken
     agairistthe March estimate  reflecting the September  12%  reduction  to  the
     Abatement, Control and Compliance appropriation. This  reduction  will  result
     in reduced contractual support for polychlorinated  biphenyl s  (PCB) inspec-
     tions.  Contractual  assistance  In developing,  formating and printing Inspec-
     tion manuals will be reduced.

     An additional reduction of -$244,600 was applied  to the  Salaries and Expenses
     ($164,600) and,  Abatement, Control  and Compliance  ($80,000)  appropriations
     to meet Congressionally mandated appropriation levels.

     -  Transfer Authority.  (+$3,400)   The  net  Increase  applied to this  activity
     includes a decrease  of -542,000 to Abatement,  Control  and Compliance  and
     an increase of +$45,400 to Salaries  and Expenses.  This  transfer will provide
     money to  purchase word processing  equipment,  fund  training for  personnel
     and purchase  supplies, including technical  and  reference material, as  well
     as photocopying and  computer supplies.

1982 Program

    In 1982, the  Agency  is allocating  a total  of $3,987,000 and  38.5  permanent
                                     TS-51

-------
workyears to this  program  of which $3,289,400 is  for Salaries and  Expenses  and
$697,600 fs for extramural purposes under the Abatement,  Control,  and  Compliance
appropriation.  Contract funds  support laboratory  analysis of samples,  inspec-
tional support,  development  and  revision  of  compliance  strategies,  and  ADP
support.

     Headquarters will manage and execute national  programs to monitor  compliance
with test  rules  and  voluntary  testing agreements  under  Section  4,  new  chemi-
cal regulations under Section 5, Section 6 chemical  control  rules, and Section 8
reporting regulations.   Surveillance  of imported  chemicals  under  Section  13
will assure that foreign manufacturers adhere to  the same  standards that domestic
manufacturers are  required  to  meet.   Headquarters  will  also  participate  in
all regulation development directed by the Office of Toxic Substances.

     The Regional   program  will  provide direct  assistance to  firms  seeking  to
voluntarily comply  with  TSCA  requirements.  Where  violations   are   detected,
firms will  be encouraged to take specific  remedial  actions to achieve compliance.
If compliance is  not achieved,  Regional offices  will  prepare and issue  notices
of violation and administrative orders, and  will develop  and  prosecute civil  and
criminal cases, as warranted.   Situations involving substantial  threats to human
health and  the environment  will  be  given   priority  as  they  are identified.

     In the implementation  of this compliance program, the Regional  staff  will
conduct 180  inspections related  to  testing; 318  inspections  related  to  new
chemicals; 1095 inspections  related to chemical  control  regulations  including
PCB marking and  disposal,  the  PCB  ban, and  the  CFC ban,  and the dioxln  regu-
lation; 280  Inspections  of  imported  chemicals;   20  inspections  of  exported
chemicals; and  125  inspections of  facilities  subject  to  the  reporting  and
recordkeeping requirements,

1983 Program Request

    The Agency  requests a   total  of  $2,632,900  and  63.9  permanent   workyears
for this program,  of which  $2,425,900  is  for the  Salaries  and Expenses  appro-
priation and $207,000 for  the Abatement,  Control, and  Compliance  appropriation.
This is a decrease of $863,500 and $490,600,  respectively.  The decrease reflects
the reorganization  of enforcement  responsibilities in the  Agency and  resource
savings resulting from the concentration of  all  compliance monitoring  activities
in the Regions.  Contract support includes on-call  inspection support,  laboratory
analysis of samples, and development and revision of compliance monitoring strat-
egies.

    Headquarters staff  will  participate in  all  TSCA  rulemaking  activities  and
will develop compliance strategies for each  new regulation.   Support  for regional
compliance monitoring,  voluntary   compliance assistance,  and  case development
activities under Sections 4,5,6,8,12 and 13 will  be  provided.   Headquarters  will
continue to manage the overall  program  through appropriate  guidance  and Regional
review including on-sight program evaluation.

     In 1983,  Regional   offices  will   conduct  875  Inspections   of  facilities
subject to chemical  control  regulations, including  requirements  on PCB  marking
and disposal, the PCB ban,  the  CFC  ban,  asbestos, and other  enforceable rules.
The Regional  offices  will  conduct 125  good  laboratory practice  (GLP) and  test
rule inspections,  265 inspections under  new chemical  regulations,  100  inspec-
tions under TSCA  reporting  requirements,  200  import inspections,  and  15 export
inspections.

     The toxics  enforcement  program  will  also   prepare  and  Issue  notices  of
violation and  administrative orders   with   the  concurrence  of  the  Office  of
Legal and  Enforcement Counsel  (OLEC)  and will provide technical   assistance  and
support to OLEC   in the prosecution of civil and  criminal  cases  as  warranted.
                                     TS-52

-------
TQX..IC SUBSTANCES ENFORCEMENT GRANTS

1981 Accompli shmerits

     The 1981 resources  obligated  for this program included $1,000,000 in  State
financial assistance.  Pilot cooperative grants were developed with five  States:
California, Connecticut, Maryland, Michigan, and Ohio.  Pilot States  represented
different geographical  areas  and  levels of  sophistication in  chemical   control
legislation.,  These grants provided for the development of model  chemical  control
programs.  Information  generated  by  the  program  will be available  to   States
interested in developing or enhancing their chemical  control efforts.

1982 Explanation ofChangesfromJanuary Budget Estimate

                      January        March           Current
                      Estimate       Estimate       Estimate

                      $500,000       £500,000       $500,000

     There is no change to this activity.

1982 Program

     In 1982, the Agency  is allocating a total of $500,000 to this program,  all
of which is  for extramural purposes  under the Abatement  Control and  Compliance
appropriation.   The pilot cooperative grant program with California, Connecticut,
Maryland, Michigan, and  Ohio will  continue.   In  1962, the operation of  these
model chemical  control programs will  be tested and the pilot program  evaluated.

1983 Program Request

     The Agency requests  no  resources for  this program in  1983.  The  results  and
evaluation of the operation  of the project  in the various States  will  be made
available to other States Interested in chemical control.
                                      TS-53

-------
Energy
  SECTION TAB

-------
Page Intentionally Blank

-------
                                             ENERGY
ACTUAL
1981
JANUARY
ESTIMATE
1982
(DOLLARS
APPROPRIATION
Salaries 8 Expenses
Research 6 Development
TOTAL, Energy
PERMANENT FULL-TIME HORKYEARS
TOTAL WORKYEARS
$9,919
$74,644
$84,564
147
219
.3
.9
.2
.5
.5
$12,790
$84,054
$96.845
142
241
.4
.9
.3
.4
.7
MARCH
ESTIMATE
1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
IN THOUSANDS)
$12,767
$57,378
$70,145
144
244
.0
.9
.9
.9
.2
$11,221.
$41,270.
$52,492.
131.
213.
8
5
3
9
2
$7,019
$27,510
$34,530
61
100
.4
.8
.2
.8
.1
-$4,202.4
-$13,759.7
-$17,962.1
-70.1
-113.1
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
$111,730.0 $118,439.0 $109,264.0
$107,5/9.0
$85,557.0  $55,501.0 -$30,056.0
Multl-Media Energy
Program
 Salaries £ Expenses
 Research & Development

Oxidants Energy
 Salaries & Expenses
 Research 8 Development

Gases And Particles
Energy
 Salaries & Expenses
 Research & Development
  $3,881.2   $5,227.0   $5,143.7   $4,912.6   $4,521.8    -$390.8
 $28.894.5  $31,140.2  $23,384.2  $20,264.9  $20,011.2    -$253.7
  $1,382.8   $1,835.4   $1,822.6   $1,745.2
  $8,747.6  $12,491.9  $11,491.9   $8,800.1
  $2,100.6   $2,626.1   $3,415.1   $2,817.2
 $14.403.6  $21,751.0  $13.434.8   $9,210.2
              $410.9  -$1,334.3
              $966.9  -$7,833.2
            $2,086.7    -$730.5
            $6,532.7  -$2,677.5

-------
                                    ACTUAL
                                     1981
                                             ENERGY
            JANUARY
            ESTIHATE
              1982
             MARCH     CURRENT   ESTIHATE INCREASE +
            ESTIMATE   ESTIMATE    1983   DECREASE -
              1982       1982            1983 VS 1982
                                             (DOLLARS IN THOUSANDS)
Hazardous Alt* Pollutants
Energy
 Salaries A Expenses
 Research * Development

Water Quality Energy
 Salaries * Expenses
 Research A Development

Drinking Water Energy
 Salaries A Expenses
 Research A Development

Industrial Hastewater
Energy
 Salaries A Expenses
 Research * Development

Solid Waste
Energy
 Salaries A Expenses
 Research A Development

Chemical Testing
A Assessment Energy
 Salaries A Expenses
 Research A Development
  $472.1
$3,701.1
  $523.3
$9,396.1
   $16,7
$1,937.5
$1,007.3
$1,427.0
  $260.3
  $583.9
   $63.2
$4,729.4
  $679.9
$5,234.2
$1,120.5
$2,324.0
  $242.2
$1,138.0
  $102.5
$1,988.4
$1,059.3   $1,050.1     $669.9
$9,975.6   $4,675.6   $2,589.2
$1,113.0
$1,924.0
                                  -$669.9
                                -$2,589.2
$896.8
-$896.8

-------
                                             ENERGY
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
                                               (DOLLARS IN THOUSANDS)


Municipal Spills
Energy
 Salaries S Expenses                $211.8                $120.0     $180.1               -$180.1
 Research S Development             $361.7                $480.0     $406.1               -$406.1

 Salaries * Expenses              $9,919.3  $12,790.4  $12,767.0  $11,221.8   $7,019.4  -$4,202.4
 Research S Development          $74,182.4  $84,054.9  $57,378.9  $41,270.5  $27,510.8 -$13,759.7
RESEARCH S DEVELOPMENT    TOTAL  $84,101.7  $96,845.3  $70,145.9  $52,492.3  $34,530.2 -$17,962.1

TOTAL PERMANENT HORKYEARS
Multi-Media Energy                    67.5       68.3       66.8       61.7       36.8      -24.9
Program

Oxidants Energy                       20.3       22.0       22.0       21.9        5.3      -16.6

Gases And Particles                   24.4       23.7       29.6       27.0       19.7       -7.3
Energy

Hazardous Air Pollutants               6.4        5.3        1.4
Energy

Mater Quality Energy                   3.7        6.7        6.7        2.9                  -2.9

Drinking Water Energy                   .2

Industrial Wastewater                 15.5       14.4       14.4       14.4                 -14.4
Energy

-------
                                                                 ENERGY
i
*>

Solid Waste
Energy
Chemical Testing
ft Assessment Energy
Municipal Spills
Energy
RESEARCH & DEVELOPMENT TOTAL
TOTAL WQRKYEARS
Multi-Media Energy
Program
Oxidants Energy
Gases And Particles
Energy
Hazardous Air Pollutants
Energy
Water Quality Energy
Drinking Water Energy
Industrial Wastewater
ACTUAL JANUARY MARCH CURRENT I
1981 ESTIMATE ESTIMATE ESTIMATE
1982 1982 1982
4.5 2.0
.6
4.4 4.0 4.0
147.5 142.4 144.9 131.9

90.1 88.5 87.0 85.4
28.8 33.0 33.0 30.8
39.8 56.4 70.7 55.5
10.3 11.6 3.2
10.6 17.3 17.3 11.5
.2
25.8 29.0 29.0 26.0
:STIHATE INCREASE +
1983 DECREASE -
1983 VS 1982


4.0
61.8 -70.1

54.9 -30.5
8.4 -22.4
36.8 -18.7

-11.5

-26.0
               Energy

-------
ENERGY

Solid Haste
Energy
Chemical Testing
& Assessment Energy
Municipal Spills
Energy
RESEARCH & DEVELOPMENT TOTAL
ACTUAL
1981
6.4
1.4
6.1
219.5
JANUARY
ESTIMATE
1982
5.9

241,7
MARCH
ESTIMATE
1982


4.0
244.2
CURRENT
ESTIMATE
1982


4.0
213.2
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982


-4.0
100.1 -113.1

-------
                                      ENERGY
OVERVIEH AMD STRATEGY

     EPA's Energy  research and development program helps ensure,  in  conjunction
with industry  and  other public sectors, that the nation's  energy  production and
utilization practices proceed  in  an  environmentally acceptable manner.  Current-
ly, research and development activities focus on four distinct areas:

     -  Developing  the  scientific data  necessary to understand the phenomenon of
        acid precipitation.

     -  Developing  the  necessary health and environmental  data  bases associated
        with new or emerging energy processes.

     -  Developing  the  necessary performance,  reliability,  and   cost data  on
        energy-related pollution control technologies.

     -  Developing  and  validating air  quality  and  complex  terrain  models  to
        understand more  accurately the  transformation,  transport and fate  of
        gases  and particles emitted from energy-producing sources.

     These research activities develop the scientific and technical data required
to support our regulatory  development, Implementation and reform objectives.  For
Instance, the  development  and validation  of  air  quality  models provides the
Regions, States and  industry  with the necessary data to  support permit prepara-
tion and reviews, environmental impact  statement reviews, and  revisions to State
Implementation Plans.   Similarly, EPA's control  technology efforts  provide the
necessary technical  performance,   reliability  and  cost data  to  accelerate the
commercialization of  cost-effective  pollution  control  technologies,  as well  as
to support  program  offices in  the review of  New  Source Performance Standards.
This and other energy research efforts allow for the development of scientifical-
ly creditable  data needed  to support our regulatory reform efforts.

Program Highl ights
     Many questions  remain  unanswered  about the causes, effects,  and  methods of
mitigating or controlling acid precipitation*   The objective of acid precipitation
research is  to develop  the  necessary  data to  fully understand the sources  and
characteristics of acid  rain, the extent of damages or potential damage, and the
options for mitigating its effects.  Without this information it will be impossible
to develop  cost effective,  scientifically  sound,  regulatory policies.   Because
of the potential national  and international  Implications of this phenomena, this
area will receive a 33 percent increase in resources  1n our 1983 research program.

     For program purposes, acid rain research activities can be described by five
generic categories:  man-made  sources, atmospheric processes, deposition monitor-
ing, health  and  environmental  effects,  and  assessment  and  policy  analysis.
Research efforts in  the  man-made  sources are' designed to improve and consolidate
inventories of current and  projected emissions of  acid precipitation precursors,
and to  develop capabilities  to  evaluate the  costs  and  performance of  control
measures for  all  major  source categories.   Research efforts in the atmospheric
processes area are designed to address  the physical understanding and mathematical
description of acidic deposition.  In deposition monitoring, efforts are designed
to systematically  collect  rainfall, meterol ogical  and  other  data at  specified
                                       E-6

-------
sites.  In the  area of health  and  environmental  effects, research  projects  are
being conducted  to  understand the  Impact  of acid  deposition  on crops,  forests
and soils, drinking  water,  aquatic  systems and materials.  Finally,  the  assess-
ment and policy  analysis  research efforts  perform  integrated  assessments  linking
all areas  of research under  the  Federal   Interagency Task  Force and  assess  the
costs and benefits of alternative mitigation strategies.

Synthetic Fuels

     A second major  research  activity  is  the development and evaluation  of  data
on the health  and environmental  impacts of pollutants associated with synthetic
fuel processes,  and  the  assessment  of control technology options for mitigating
these impacts.   These  efforts will  assist  industry and permitting  officials  in
identifying problems  which might   Impede  the timely  commercialization  of  the
industry in an environmentally acceptable  manner.   The major emphasis 1n the  1983
program will  be placed  on  developing Integrated  health  and environmental  risk
assessments for  several synfuel processes;  providing technical  assistance 1n the
Regions and  States in the areas of  oil  shale, coal  liquefaction and coal  gasifi-
cation; and  evaluating the performance,   reliability  and  cost  of  alternative
control technologies.

Cost-Effectiye Control Techno!ogles

     ft third major research area is the development of  the necessary performance,
reliability, and  cost  data  to accelerate  the commercialization  of  Innovative  or
cost-effective energy-related pollution control  technologies.  The  major thrust
In this  area 1s the development of  the  limestone  Injection multistage  burner
(LIMB).  The LIMB is a technology  which combines  SOg  control  with  simultaneous
MOX control  by  mixing coal and limestone  together, pulverizing the  mixture  and
combusting the  mixture in  a  low NOX  burner.  This  technology can  potentially
lower the capital cost  of SOX control  by a factor  of 3 to  4  and the annual  cost
by 50 percent.   Among  the other potential   cost-effective technologies receiving
research support are the low NOX  burner,  the heavy  oil/low  NOX  burner in  an
oil field  steamer,  two  new electrostratic  precipitation  precharger  technologies,
flue gas desulfurization  and  electrostratic fabric filtration.  These technolo-
gies will  be used to  control SOX, MOx,  and partlculate emissions  and  also  to
support our  regulatory  program  efforts on  the review  of Mew  Source Performance
Standards.

Air QualityModelling

     The fourth  major  area of  research 1s  in  complex terrain and  air  quality
modelling.  Complex  terrains  can  greatly  affect the manner in which  plumes  are
transported and  dispersed.  Similarly, the  formation and movement of large scale
polluted air  masses over continental  distances  are  difficult to  study.   The
results of  these research  activities  are  used by the Regions,  the  States  and
industry to prepare  and evaluate State Implementation Plans  (SIPs),  Environmental
Impact Statements, and review permit applications.

     The President's  1983 Budget  provides for S34.5  million  and   62 permanent
workyears, a  decrease  of $18 million  and  70  permanent  workyears from the  1982
current estimate.  Three factors influence this reduction:

     -  First,  energy-related research in  Mater  Quality  and  Industrial   Waste-
        water will be  completed in 1982  while research  on  oil  spills  will  be
        transferred  to the Hazardous Waste Research program.

     -  Second,  synfuels  control technology  efforts have  been reduced  because
        (1) commercialization efforts have  slowed markedly, (2)  certain areas  of
        synfuels control technology research cannot be  conducted cost-effectively
        unless commercial facilities are avail able,, and  (3)  the synfuel s Industry
        has both  the capability and resources in  many Instances to  develop the
        prerequisite pollution controls.

     -  Third,  several  conventional  combustion control technology  research  pro-
        jects will  reach  the  engineering   stage in 1982  where  Industry is in  a
        better position to commercialize our research findings.

                                       E-7

-------
                                     ENERGY


SUMMARY OF INCREASES AND DECREASES

                                                         (in thousands of dollars)

     1982 Energy Program...	,	        $52,492.3

        Salaries and Expenses	         -4,202.4

        This decrease reflects the  reduction of in-house
        efforts associated with evaluating the pollu-
        tion control options for several synthetic fuel
        and conventional combustion processes, and per-
        forming integrated  risk-benefit  analyses  for
        synthetic fuel facilities.   It also reflects the
        completion of research in the Water Quality and
        Industrial Wastewater research programs and the
        transfer of the Municipal Spills program to the
        Hazardous Waste  Non-Energy  research   program.

        Research and Development	        -13,759.7

        This decrease reflects the extramural  reduction
        associated with those  energy activities  cited
        above.

     1983 Energy Program		...        $34,530.2


SUMMARY OF CHANGES TO JANUARY1982 BUDGET ESTIMATE

                                                         (in thousands of dollars)
     January 1982 Estimate	   '     $96,845.3

        January-March	        -26,699.4

        Reprogrammi ngs	,	           -508.1

        Congressional Actions	        -14,943.0

        A decrease of  $12,343,800 to Research  and De-
        velopment was taken against  the  March estimate
        to reflect  the  September 12%  reduction.   An
        additional reduction of  $2,599,200 was  applied
        to the Salaries and  Expenses  ($1,970,400), and
        Research and Development  ($628,800)  appropria-
        tions to  meet  Congressional ly mandated appro-
        priation levels.

        Transfer Authority	,		..         -2,202.5

        A net  decrease of  $2,202,500 was  transferred
        from this  program as  follows:   $3,135,800  was
        transferred from Research and Development;
        and $933,300 was  transferred  to  Salaries  and
        Expenses.

Current 1982 Estimate	        $52,492.3
                                       E-8

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                ENERGY

                                          Multi-Media Energy
                                    ACTUAL
                                     1981
             JANUARY
             ESTIMATE
               1982
           MARCH
          ESTIMATE
            1982
          CURRENT   ESTIMATE INCREASE +
          ESTIMATE    1983   DECREASE -
            1982            1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Technical Information
Information & Liaison
 Salaries 8 Expenses
 Research & Development

Health Effects
 Salaries S Expenses
 Research & Development

Environmental Engineering
4 Technology
 Salaries 8 Expenses
 Research S Development

Environmental
Processes 8 Effects
 Salaries 8 Expenses
 Research 8 Development

Acid Rain
 Salaries & Expenses
 Research 8 Development
   $231.0
     $8.7
$231.4
 $15.6
$199.4
 $15.5
$161.5
 $15,5
$32.1
    $26.1      $65.3      $64.8      $64.8     $633.4
 $3,594.2   $1,622.2   $1,550.8   $1,301.3   $1,755.5
-$129.4
 -$15.5
                                           $568.6
                                           $454.2
 $3,222.7   $4,350.2   $4,316.9   $3,840.7   $3,373.2    -$467.5
$15,280.3  $17,032.4  $10,647.9   $4,924.4   $6,259.7   $1,335.3
   $193.4     $350.2     $332.7     $630.7               -$630.7
 $3,330.3   $3,662.5   $2,362.5   $5,216.2      $450.0  -$4,766.2
   $208.0     $229.9     $229.9     $214.9     $483.1     $268.2
 $6,681.0   $8,807.5   $8,807.5   $8,807.5  $11,546.0   $2,738.5

-------
                                    ACTUAL
                                     1981
                         ENERGY

                   MultJ-Media Energy

                       JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                       ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                         1982       1982       1982            1983 VS 1982
                                             (DOLLARS IH THOUSANDS)
TOTAL:
 Salaries 8 Expenses
 Research S Development

Multi-Media Energy
 Program
           $3,881,2   $5,227.0   $5,143.7   $4,912.6   $4,521.8   -$390.8
          $28,894.5  $31,140.2  $23,384.2  $20,264.9  $20,011.2   -$253.7

TOTAL     $32,775.7  $36,367.2  $28,527.9  $25,177,5  $24,533.0   -$644.5
PERMANENT FULL-TIME HORKYEARS
Technical Information
Information S Liaison
Health Effects
Environmental Engineering
S Technology
Environmental
Processes S Effects
Acid Rain
TOTAL PERMANENT HORKVEARS
3.7
.6
58.2
1.6
3.4
67.5
3.8
.3
59.1
1.1
4.0
68.3
2.8
.3
59.1
.6
4.0
66.8
2.8
.3
51,1
3.5
4.0
61,7
-2,8
3.1 2.8
26.7 -24.4
-3,5
7.0 3.0
36. B -24.9

-------
            ENERGY

      Multl-Media Energy

ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
 1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
            1982       1982       1982            1983 VS 1982
TOTAL WORK YEARS
Technical Information
Information 8 Liaison
Health Effects
Environmental Engineering
& Technology
Environmental
Processes & Effects
Acid Rain
TOTAL UORKYEARS

7.0 6.1 5.1 5.1 -5.1
1.6 1.0 1.0 1.0 9.2 8.2
74.7 72,9 72.9 64.9 37.7 -27.2
2.9 4.5 4.0 10.4 -10.4
3.9 4.0 4.0 4.0 8.0 4.0
90.1 88.5 87.0 85.4 54.9 -30.5

-------
                                      ENERGY

                                Multl-media Energy
Budget Request
     The Agency  requests  a total of  $24,533,000  and 36.8  permanent  workyears
for 1983,  a decrease  of  $644,500  and  24.9  permanent workyears  from  1982.
Included in this total  is $4,521,800  for Salaries  and Expenses and $20,011,200
for Research and Development,  with  decreases  of  $390,800  and $253,700,  res-
pectively.  This  decrease  reflects  the deemphasis  of  synfuel s  research  re-
sulting from slower  commercialization  efforts by  industry,  and the  unavail-
ability of  commercial  synfuel  facilities to  perform certain control technology
projects.

Program Description

     The Multi-media Energy  program  addresses  those problems  originating  from
energy sources which have the potential to adversely  affect the environment  In
one or more media.   In broad terms,  the primary  objective of  this program  is
to provide EPA program and Regional  offices, State and  local  governments,  and
Industry with  the  scientific information  necessary to  permit  the development
and utilization  of  this   nation's   natural  resources   in  an  environmentally
acceptable manner.  To achieve this objective, the  Multi-media  Energy  Research
program addresses  three major  subjects:  synthetic fuels,  acid rain,  and  the
limestone injection multi-stage burner(LIMB)/low NOX control technology.

     The synthetic  fuels   research  program  assists  industry  and  permitting
officials in identifying  problems which might Impede  the  timely  commerciali-
zation of  this  industry  in an  environmentally acceptable manner.   Specific
research activities  include:  developing  Integrated  health and  environmental
risk assessments for several synfuel  processes;  providing  technical assistance
to the Regions and States  in  the areas  of oil  shale, coal  liquefaction  and
coal gasification; and evaluating  the performance,  reliability  and  cost  of
alternative control technologies.

     Acid rain research seeks  to assess the magnitude,  extent  and  severity  of
acid deposition effects,  the sources of these effects and the possible measures
which could be employed to mitigate these effects.

     The LIMB/1ow  NOX  program  represents  a potentially  less expensive  control
technology which  can   also  lower both  NOX and  SOX  emissions  simultaneously.
This program develops  the  necessary  performance,  reliability and cost  data  to
accelerate  the  commercialization of  this  technology  as well  as  support  our
regulatory program efforts in their review of  New  Source Performance Standards
for utility biolers.  This program will be consolidated in 1983 by transferring
research from  the Oxidants  Energy  and Gases and  Particles  Energy  programs
because information  generated  In this activity directly assists  the  Acid Rain
research program.

TECHNICAL INFORMATION AND LIAISON

     Refer  to  the Oxidants  Non-Energy narrative  for  a description  of those
Technical Information  and  Liaison activities  that  are common to  all  research
and development  budget sub-activities.  Activities  specific  to  this  budget
sub-activity are indicated in the program element description below.

1981 Accomplishments

     In 1981,  the  Agency used  a  total  of $239,700,  of which $231,000 was under
the Salaries and Expenses  appropriation and  $8,700 was for extramural  purposes
under the Research and Development appropriation.  •
                                      E-12

-------
     Besides the  major activities  described above,  specific  accomplishments
in the  area  of energy  included  the publication of  an  EPA  acid  precipitation
assessment plan and an oil shale industry environmental  assessment.

1982 Explanation of Changes from January Budget  Estimate


                     January           March         Current
                     Estimate         Estimate       Estimate

                     $247,000         $214,900       $177,000

     The net decrease  of -$70,000  results  from several  actions, as  follows:

     "  January -March.   (-$32,100)   This  change represented  a decrease  of
     $32,100 fromtheJanuary budget,  of  which $32,000  was for Salaries  and
     Expenses and $100 was for Research and Development.   This decrease resulted
     in the  reduction  of  Regional  liaison  activities,  and  reduction of  the
     number of technical information documents published,

     -  Corvgressional Acti ons.  (-$37,900)   An additional  reduction  of -$37,900
     was applied tothe Salaries  and Expenses appropriation to meet Congression-
     al mandated appropriation level.

1982 Program

     In 1982, the Agency  is allocating a total  of $177,000 and  2.8  permanent
workyears to this program, of which $161,500 is  under the Salaries and Expenses
appropriation and $15,500  is for  extramural  purposes  under the Research  and
Development appropriation.

     In 1982, activities will continue to focus  on  the preparation and dissemi-
nation of energy research publications  and  provide a  mechanism  to promote  com-
munications between ORD and the energy user community.

1983 Program Request

     The Agency requests  a  total  of $32,100 for this program, all of  which is
for Salaries and  Expenses.   This  reflects  decreases of  $129,400 and  $15,500
respectively, resulting from  a  deemphasis  in the  synfuels program  which  will
require less publications and the dissemination  of  such  information.

     In 1983, the  Technical  Information and  Liaison  program will  stress  pro-
viding the  necessary  technical   information to   State and  local  officials  in
support of  their  increased  role  in  administering  environmental   programs.

HEALTH EFFECTS

1981 Accomplishments

     In 1981, the Agency used a total of $3,620,300 for this program,  of  which
526,100 was under the  Salaries  and Expenses appropriation,  and  $3,594,200 was
for extramural   purposes  under   the  Research  and  Development  appropriation.

     EPA developed the integrated risk assessment program to estimate the health
and environmental  risks associated  with  emerging  energy processes.   Adverse
health effects are expressed in  terms of the incidence of mortality  and morbid-
ity, while  adverse  environmental effects  are expressed  in  terms of  economic
loss (crops, fisheries  resources),  loss  of  species  and  habitat,  and  other
ecosystem changes.   To perform these risk analyses,  data on pollutant release
rates, multi-media transport, and  effects  are needed.   Reliable, inexpensive,
short-term testing methods  are  also  needed to   obtain  these data in  the  most
                                      E-13

-------
cost-efficient manner.

     The following research accomplishments provide input to the  integrated  risk
assessment program.

     - A  unique  inhalation  exposure  facility  was   utilized  to  characterize
       the biological  effects  of diesel  exhaust  alone and  in combination  with
       coal dust  exposure  in  rats  and monkeys.   This technique  is needed  for
       comparative evaluations of combustion products  from petroleum-based fuels
       versus synthetic fuels.

     - A  teratogenicity test using  amphibian  embryos was   developed  to  pro-
       vide guidance  in  prioritizing  the  need  for further  biological  testing.
       Standardization tests  using  eleven known  mammalian  teratogens were  com-
       pleted.

     - Teratogenicity  tests  on  eleven   complex  mixtures  of  fossil  fuel   ma-
       terials were  completed,  and a Teratogenic  Index which  relates  terato-
       genicity and  embryo  lethality  was  formulated  to   facilitate  compari-
       sons of  teratogenic  potential   between   various compounds  and  mixtures.

     - Support  was  provided  to  the  Fossil  Fuels  Research  Materials  Facility.
       These samples  developed  at  the  facility  were  utilized  by  about  30
       investigators to develop bioassay methods.

1982 Explanation of Changes from January Budget Estimate


                     January           March        Current
                    Estimate         Estimate       Estimate
                  $l,68/,5Cto       $1,615,500     $1,366,100

     The net  decrease of -$321,400 results from several  actions,  as  follows:

     -  January - March.   (-$71,900)   This  change  represented  a  decrease  of
     $71,900 from the January budget,  of which  $500 was for Salaries and Expenses
     and $71,400  was  for Research  and Development.   This  decrease  resulted  in
     reduced efforts to evaluate Industrial hygiene in synfuel  plants.

     -  Congressional Actions.  (-$249,500}  A  reduction  of -5249,500  was  taken
     against the  March  request  reflecting the  September 12% reduction to  the
     Research and Development appropriation.   This  will  result in  a  reduced
     effort In the integrated risk  analysis program.

1982 Program

     In 1982,  the Agency is  allocating  a total  of $1,366,100 and  .3 permanent
workyears to  this program,  of which  $64,800 is under the Salaries  and Expenses
appropriation and $1,301,300  is  for  extramural  purposes  under the  Research  and
Development appropriation.

     In 1982,  the Health  Effects   research  program fills  data   gaps  Identified
in the initial stages of the integrated risk assessment program,

     Microbiai and mammalian  cells are  being   utilized  in  assays  for mutageni-
city and  cytotoxicity to determine potential genotoxicity of  various  oil  shale-
related waste streams and  fractions.   These  data will  facilitate the development
of a comparative risk analysis.

     A series  of studies are being conducted   to determine the  degree  to  which
a set  of compounds,  representative of synfuel  process effluents and products,
are transported  via  the foodchain  (plant  and  animal)  to   human  consumption.
                                       E-14

-------
1983 ProgramRequest

     The Agency requests a  total  of $2,388,900 and  3.1  permanent workyears  for
this program,  of  which  $633,400  is  for Salaries  and  Expenses  and  $1,755,500
is for  Research  and  Development.   This  reflects an  increase of  $568,600  and
$454,200 respectively.  This  increase  results  from  the transfer  of the  entire
integrated health and environmental risk  assessment  program  from  the Multi-media
Energy Environmental  Processes  and  Effects program  to the Multi-media  Energy
Health Effects program.

     In  1983, the  Health Effects  research  program will  focus on producing  new
or upgraded  health  and  environmental   risk  analyses  for   synfuel   processes.
These efforts  will   support  program  office and  State  needs by  providing  the
necessary data to  promulgate  cost-effective standards and  regulations for  syn-
thetic fuel processes as well  as  supply  information that  can be used to  review
permit applications.

Specific activities include  the following:

     »•  Finalize  and peer review  the draft health  risk  analyses  for  indirect
        and direct coal  liquefaction,  and for oil  from  shale  processes.

     -  Complete   the environmental  risk  analysis  for  oil  shale  extraction.

     -  Upgrade the  environmental  risk  analyses  for  indirect and direct  coal
        liquefaction to  include all  models.

     -  Conduct  terrestrial   food   chain studies  for  three major  groups  of
        effluents from the  synfuel  industry.

     -  Obtain and  evaluate  human  health data for  several   groups  of  chemical
        compounds associated with synfuels.

     -  Study  the   atmospheric  transformation   of several  groups  of chemicals
        associated with  synfuels using mutagenicity  as an  indicator  of toxidfy.

     -  Compile and use a  data base  for aquatic  toxicity   of  synfuels and  in
        upgrading health and environmental risk analyses.


ENERGY ENVIRONMENTAL ENGINEERING ANDTECHNOLOGY

1981 Accomplishments

     In 1981, the Agency used  a total  of $18,503,000  for this program, of  which
$3,222,700 was under the  Salaries and  Expenses  appropriation  and  $15,280,300
was for  extramural  purposes under  the  Research  and  Development appropriation.

     Synthetic Fuels Program.   In  1981,  the Office  of Research  and  Development
(ORD) placed emphasis on identifying  the environmental pollutants and requisite
control technologies  for synfuels  plants.  The  synfuels program 1s  designed  to
provide engineering  assessments on  the  cost   and performance  capabilities  of
alternative control  technologies for synthetic  fuel  facilities; provide emission,
effluent, and solid  waste data  which are  required by State and Regional  environ-
mental officials  to grant construction permits; and provide  support  in reviewing
Environmental Impact  Statements (EISs).   The  control  technology Information  is
used by synthetic fuel developers to select the most effective control technolo-
gies, and  utilized  by EPA program  offices  to  perform cost-benefit analysis  of
alternative regulatory options.
                                      E-15

-------
     Specific accomplishments included:

     -  Oil   shale  wastewaters from  the Occidental  No.  6 burn,  Paraho and  Rio
        Blanco projects were characterized.   Air emissions  from oil  shale retort-
        ing were character!zed,  and wet  scrubbing  for  particulate control  was
        evaluated in cooperation with  the Department of Energy.  Leaching  tests
        of Paraho and Colony spent  oil  shale were completed.

     -  In the  area  of coal  gasification  and liquefaction,   an  evaluation  of  a
        Lurgi commercial  coal gasification  plant was completed on  a gasifier at
        Kosovo (Yugoslavia).  The evaluation has  shown  significant emissions  of
        POM (3aP) from  vents from the  lock hoppers  and  coal feeders.   Ambient
        monitoring  showed an  abnormally high  level  of  BaP   generated  by  waste
        flaring.

     -  A study  assessing the feasibility  of using biological oxidation  on coal
        synfuels wastewater   was  completed.   These studies  show that biological
        treatment alone  of  Lurgi wastewaters  does not  result in  an acceptable
        effluent.

     -  Low BTU atmospheric  coal  gaslflers (Stoic, We11man  Galusha and
        Wilputte-Chapman) were  evaluated   to  determine  environmental   impacts.
        These data   are  required by  the  Office  of Air,  Noise  and  Radiation
        to develop  plans for establishing a NSPS for coal and  oil shale  synfuels
        plants.

     -  Technical support was provided to the states of Kentucky and West Virginia,
        and EPA  Regional  offices  to  determine  the  adequacy  of  Environmental
        Impact Statements and synfuel  permit applications  for H-Coal and SRC-II
        direct coal  liquefaction processes.

     -  A  comprehensive chemical  and  biological character-ten"zation  of  waste
        streams and  products  from  Exxon  Donor  Solvent  and  SRC-II direct  coal
        liquefaction pilot plants was conducted.   Organic  priority  pollutants in
        wastewater  streams   from  the  Exxon Donor  Solvent pilot plant were  found
        to be lower than lOppb.

1982 Explanation of Changes  from January Budget Estimate


                     January           March         Current
                     Estimate         Estimate       Estimate

                  $21,382,600      $14,964,800     $8,765,100

     The net decrease  of -$12,617,500  results from several  actions, as  follows:

     -  January - March.  (-$6,417,800)   This change represented a decrease of
     $6,4l.7,ttuu from the January budget,  of  which $33,300 was for  Salaries  and
     Expenses and 56,384,500 was for Research and Development.

     -  Reprogrammirig.  (-$46,200)   During the development  of the operating  plan,
     several iniseel 1 aneous  reprogrammlngs, which  are  not reportable to  Congress,
     were made  to  this  activity  and  resulted in a net  decrease  of  -$46,200.

     -  Congressional Actions.   (-55,601,700)   A  reduction   of  -$4,695,300  was
     taken against the March  estimate  reflecting the September 12% reduction to
     the Research and Development appropriation.  A portion of this reduction re-
     flects final Conference action on our 1982 Appropriation Bill  (-$3,691,300).
     The additional  reduction will  decrease  our efforts  in  research  activities
     related to synthetic fuels  development (-$1,004,000).
                                      E-16

-------
        An additional  reduction  of  -$906,400 was  applied to  the Salaries  and
     Expenses ($733,600) and  Research and Development  ($172,600)  appropriations
     to meet Congressional  mandated appropriation level.

     •  Transfer AUtho r1ty.  (-$551,800)  The  decrease of $551,800 applied to this
     act! VI ty "1 sBade'Tip of a decrease of -$855,400 from Research and  Development
     and an  Increase of $303,600  to  Salaries  and Expenses.   The Salaries  and
     Expenses Increase will allow  lab program reviews, monitoring  of extramural
     projects, as well as,  the conduct of more program evaluation  studies.   The
     Increase will also  permit  modifications of  Research Triangle Park  synfuel
     combustion testing facility  that will Increase the quality and comprehensive-
     ness of emissions  data.   They  will  provide for  equipment purchases for  a
     methanol combustion test facility  as well  as  equipment  purchases  for  a
     synfuels fugitive properties test facility-

1982 Program

     In 1982, the Agency 1s allocating a total  of $8,765,100  and 51.1 permanent
workyears to this program,  of which $3,840,700 1s under the Salaries and Expenses
appropriation and  $4,924,400 is  for extramural  purposes  under  the  Research
and Development appropriation.

     Synthetic Fuels Program.  In  1982,  the  Agency  will  continue to  place  em-
phasis on  evaluatingcontrol  options for various  synthetic  fuel  processes  and
include the following projects:

     -  Conduct  an  assessment   of  wastewater  treatment  control  technologies,
        and an  evaluation   of air  pollutant  emissions  associated with  in-sltu
        and surface processes.

     -  Conduct  a  multi-media environmental  assessment of low,  medium and  high
        6TU coal gasification and Indirect liquefaction processes; source testing
        of direct coal  liquefaction processes;  and bench  scale testing of  coal
        synfuel wastewater  and gaseous discharges.  These data  will  be used  by
        the program  offices to develop plans  for establishing a  New  Source  Per-
        formance Standards (NSPS) for synfuels plants.

     -  Complete a source measurement synfuels report and an evaluation of opera-
        tional  and maintenance effects on synfuel  fugitive emissions.   These data
        will be  used  by the Synthetic Fuels Corporation and distributed to their
        applicants.

     -  Place major emphasis  on providing the Regions  with  technical  support  for
        reviewing EISs, and providing synfuel  permit  reviewers in the  Regions
        and States with technical manuals describing pollutants and control  tech-
        nologies for major coal and oil shale synfuel  processes.

     LjMB/Low Npx Control.Technol ogy.  In conjunction  with research  on the  LIMB
process' ini the Oiridants; arid Gases and Particles Energy programs, a pilot evaluation
of the  LIMB  process  on  tangential ly  -  fired and  wall-fired  boilers is  being
conducted.

1983 Program Request                    '

     The Agency  requests a  total   of $9,632,900  and  26.7  permanent  workyears
for this program of  which $3,373,200  is  for Salaries and Expenses and $6,259,700
is for  Research  and  Development.   This  reflects a decrease  of $467,500 and  an
increase of  $1,335,300,  respectively.  The decrease  reflects the  deemphasis  of
the synfuels  research program based  on  the  slower  commercialization of  this
industry; the  increase results  from  the  transfer  of  the  LIMB/low  NOX  program
from the  Oxidants  and Gases and  Particles  Energy  programs  to  this  program.
                                      E-17

-------
     The 1983 engineering and control technology program will  continue to support
regulatory development requirements, as  well  as assist permitting  officials  and
industry by  (1)  evaluating the  control  options  associated with  synthetic  fuel
process; (2) providing technical  assistance to the States  and Regions;  and  (3)
assessing the  performance,  reliability  and cost  of  the  LIMB/1ow NOX  process.

     Synthetic Fuels Program.  The  synfuels activities  will  consist  primarily
of providing technical support to the EPA  Regions  and  the  States  In the  areas  of
oil shale,  coal  gasification  and coal   liquefaction.   The Agency  will  evaluate
the control  technology  performance,  reliability and  cost  of the  H-Coal  direct
liquefaction process.  Source  testing on the H-Coal pilot plant  will  be limited
to key  streams  and pollutants at the Level I/ Level  2  degree of  screening  for
controlled releases.   Synfuel  combustion  testing  will  be followed by  chemical
and biological   characterization  of  combustion products.  A  comparison  will  be
made with conventional fuel analogs.  The Agency will  also evaluate recycle/reuse
technologies as  an alternative  approach  to  direct disposal  of  synfuel  solid
waste.  An environmental  assessment will  be conducted on the reuse of coal conver-
sion wastewaters for cooling tower makeup.

     LlMB/Low MOX Control Technology.  The  performance  of  the LIMB process in  a
one ml 111 on  BTl) Tahgehtl al ly-f*1 red and a one million BTU  wall-fired furnace  will
be tested.  Boiler conditions will be simulated, and various  types  of coals will
be used and evaluated.

     An assessment  of a  low NOx burner  at Utah Power  and Light  Company will  be
conducted, and  an  evaluation  of a  prototype  distributed mixing  low  NOX  coal
burner will  be  conducted  at  pilot plant  scale to determine the extent  of  NOx
capture in  both  wall-fired and  tangentially-fired boilers.   A  variety  of  coal
types will be used  and analyzed.   These  data are needed to  review NSPS for utility
boilers.  Field evaluations will  be completed for a low NOX  burner at the 25 MM
Eastern Illinois Cooperative utility wall-fired boiler test site.

E_N_mP.MMElTAL PROCESSES AMD EFFECTS.

1981 Accompl1shments

     In 1981, the  Agency  used a total  of  $3,523,700  for this program,  of which
$193,400 was under the  Salaries  and Expenses  appropriation  and $3,330,300  was
for extramural purposes under the Research and Development appropriation.

     The following  research was  designed  to  complement the  research  conducted
in the  Energy  Health Effects  program.   It  is  part  of the  integrated  risk
assessment program  which  Is   designed   to  develop  methods  for  estimating  the
health and environmental risks associated with emerging energy processes.

     -  A  generic  site model  for use in energy  risk  analyses was produced.   The
        risk analysts methodology and  site models  will be utilized to define the
        waste streams from emerging energy waste streams.

     -  Animal  studies  Illustrating  the Influence  of diet  on  the  toxiclty  of
        heavy metals  were completed.   The results indicated that certain  seg-
        ments of the  population  are at greater  risk when  exposed to pollutants.

     -  Site-specific  atmospheric  dispersion models were  adapted  to  assess  the
        transport  and  dispersion of  pollutants in  the  complex  terrain  of  the
        Green River  oil  shale formation.   Existing regional   flow  and pollutant
        models were  examined  to  identify  those models  most applicable  to  the
        Green River oil shale area.

     -  A  preliminary study on the  potential  for chronic  leaching of abandoned
        oil  shale  retorts  was  completed.   The  report  identified  surface  and
                                      E-18

-------
       . sub-surface geological  factors  that can  be related  to aquifer  charac-
        teristics and groundwater movement.

     -  The  Mobil  Emissions  Testing  Facility, which  is  used  to determine  the
        emissions from automobiles being driven under the  Alaskan  driving  cycle,
        was set up in  Fairbanks and Anchorage.  The information will  be utilized
        to predict air emissions  for  the unusual meteorological conditions  which
        occur in cold climates.  The data will also be used to develop and evaluate
        State Implementation Plans.

     -  A report describing improved plant materials utilized to  reclaim  surface
        mined lands In arid and semi-arid areas  of the United States was completed.
        This document will  be used by  mining  companies  to  reclaim mined  lands
        In a more cost-effective and efficient  manner.

1982 Ejcpjaflatljjn^of Changes from January Budget Estimate


                    January          March          Current
                   Estimate         Estimate       Estimate

                 $4,012,700       $2,695,200    $5,846,900

     The net increase  of  +$1,834,200 results  from  several actions, as  follows:

     "  January - March.   (-$1,317,500)  This  change represented  a decrease  of
     $1,317,500 from the  January  budget,  of which $17,500 was for Salaries  and
     Expenses and $1,300,000  was  for  Research and  Development.   This  decrease
     resulted In reduced  efforts in methods  for determining the  efforts of  energy
     pollutants on fish and wildlife management practices.

     "  Reprogramniing.  {+$6,567,000)   This reprogrammlng  of  +$6,567,000 win
     permit a morecohesive  synthetic  fuels  research  program.   The  purpose  of
     this transfer is to provide the needed assessments to be used by  the  Agency
     In the development  of standards  and  criteria  for the  emerging  synthetic
     fuels Industry.   It was decided  in 1982 that all synfuel  related  activities
     In the energy program should  be  redirected and  reprogrammed  into  the  energy
     multi-media program  so that  the  entire synthetic  fuels  would be  reflected
     in one area.   This   reprogrammlng  will  permit a  more  cohesive  synthetic
     fuels research program.   (This  reprogramming was  Included  In  a letter  to
     Congress on December  16,  1981).

     -  Conoresslpnal  Actions.   (-$1,895,400)   A  reduction  of  -$1,419,700  was
     taken against the March  estimate reflecting  the  September 12% reduction  to
     the Research and  Development appropriation.   This  decrease will  cause  a
     reduced effort in the  following areas:   integrated  risk analysis  program;
     impact of mining; and energy development  in the West.

        An additional   reduction of -$475,700  was applied to the Salaries  and
     Expenses ($33,500) and Research  and Development  ($442,200)  appropriations  to
     meet Congressional mandated appropriation  level.

     *  Transfer Authori ty.   (-$1,519,900)  ,The net change applied  to this activi-
     ty TTTSSTifr~of~~a~decrease of -$1,574,500  from  Research and  Development
     and an increase of $54,600 to Salaries  and Expenses.

1982 Program

     In 1982, the Agency  is allocating  a total of  $5,846,900 and 3.5  permanent
workyears to this program, of which  $630,700  is under the Salaries and  Expenses
appropriation and $5,216,200  Is for extramural purposes  under  the Research  and
Development appropriation.
                                      E-19

-------
Specific research activities are as follows:

     -  A draft health  risk  analysis  for direct and indirect coal  liquefaction,
        and oil from shale processes is being completed.

     -  A preliminary environmental  risk analysis for direct  and Indirect  coal
        liquefaction and an environmental risk analysis for  oil  shale extraction
        is being Initiated.

     -  Flow  reactor  studies  are  being  conducted on  synfuel  plant  emissions,
        synfuel combustion products, and transformation rates to  enable  develop-
        ment of exposure assessment models  for synthetic  fuels.

     -  The  development of  an improved,  site-specific  air quality  dispersion
        model for  sources  in the  complex  terrain area  of  the  Green River  oil
        shale formation  Is being completed.

     -  The  toxicltles  of  water  soluble  fractions  of  coal  liquefaction  pro-
        ducts and  other complex organic fuel  mixtures are  being assessed  with
        indicator fish species.

     -  Technicians from  the State  of Alaska Department  of Environmental  Con-
        servation are being  trained In  the  use  of the  Mobil  Emissions  Testing
        Facility.

1913 Program Request

     The Agency requests a  total  of $450,000 for  this program,  all  of  which  1s
for Research and Development.  This reflects  a decrease of  $630,700 and
$4,766,200 respectively.  This  decrease results from the  transfer of the  Inte-
grated health  and  environmental  risk  assessment  program from  the  Multi-media
Energy Environmental  Processes  and  Effects  program  to  the Multi-media  Energy
Health Effects program.

     Carbon monoxide  modeling  studies  designed  to address  the  carbon  monoxide
non-attainment problem  in  the  Fairbanks  and  Anchorage  Air   Basins  will   be
initiated.  An evaluation  of meteorologic  data as an "early warning  system"  for
identifying potential  carbon monoxide  violations in  cold  climate areas  will  be
initiated.

ACID RAIN
1981 Accomplishments

     In 1981, the Agency  used  a total  of $6,889,000  for this program, of  which
$208,000 was under  the Salaries  and Expenses appropriation  and $6,681,000  was
for extramural  purposes under the Research and Development appropriation.

     In 1981, research  focused on the  emission  of acid rain precursors;  their
atmospheric transport and deposition; the evaluation of health,  environmental  and
material effects; and  an  assessment of  mitigative measures and policy  needs.
Results of add precipitation research will  contribute to major  components of  the
National Acid Precipitation Assessment Program.  Title VII of the Energy  Security
Act provides for the establishment of an  Interagency Task  Force  on Acid  Precipi-
tation which is charged with providing an understanding of the transport  and fate
of acid  precipitation  precursors; determining the causes  and  sources  of acid
precipitation;  evaluating the  cost-effectiveness  of  mitigative  techniques;  and
assessing the  environmental  and  health  effects  of  acid precipitation.   EPA  Is
co-chairman of  the  Task  Force  and  has  the  lead agency  role  in the  Aquatic
Effects, Control Technology, and Assessment and Policy areas.

     For descriptive purposes,  the  Acid  Rain Research  program  is grouped into
five generic  categories:   man-made  sources,  atmospheric processes,  deposition
                                      E-20

-------
monitoring, health  and  environmental   impacts*  and  integrated  assessment.    A
description of these activities follows.

     Man-Hade Sources.  The  503  emissions inventory  for  electric utilities was
completed for the entire  nation.   The  inventory  for all other  source  categories
was completed for thirty-one eastern States.  Also, a prototype advanced  utility
simulation model was  developed  and operated, and  the AIRTEST model  of electric
utility emissions was streamlined and operated.

     Atmospheric Processes.  The Multi-State Atmospheric Power  Production  Pollu-
tion Study/Regional  Acidity of Industrial  Emissions {MAP3S/  Raine)  program conti-
nued to address the physical  understanding and mathematical  description of acidic
deposition over the North  American Continent.  Research in  this progam 1s directed
towards understanding  both the wet  and  dry  deposition of  acidic aerosols and
acidic aerosol precursors  through field, laboratory and modeling studies.

     - The  regional  trajectory models, ASTRAP,  RAPT, and  AIRSOX  were upgraded
       to an applied  stage,  and were executed for numerous cases Involving the
       northeastern United States, southeastern  Canada and  other regions  of the
       United States such as the area around Mt. St.  Helens eruption.  All  three
       models are In  the  final  stages  of  documentation and a crosscomparison of
       the models for common data sets  was completed.

     - Several  field  studies designed  to provide  a  better  understanding   of the
       various physical and  chemical  processes  which occur  between  source and
       receptor were completed.  The most Important was the  Investigation  of the
       scavenging behavior  of frontal  (cyclonic)   storms.   This  study,   called
       Oxidation and  Scavenging  Characteristics  of  April   Rains  (OSCAR), was
       conducted during April 1981.

     Deposition and Monitoring.

     - Monitoring  studies focused on   providing  a national  acid precipitation
       data system,   and  developing   methods  for  dry  deposition  measurement.

     - Preliminary  data  from  the Global  Precipitation Chemistry  Network were
       examined for detailed  Information  on the chemical  composition of  preci-
       pitation In remote  areas of the  world.

     - Field and laboratory studies were conducted to characterize the dry  deposi-
       tion of  ozone,  sulfur dioxide and particles on various  surfaces,  and to
       develop new  sensors  and deposition monitors  for species of  interest in
       ecosystem acidification.

     Health And Environmental Impacts.   An active  research  program studying the
Impacts of add deposition upon aquatic and terrestrial ecosystems and materials
was continued.  Several projects  were   either completed,  continued or Initiated
in this area.  Among these were the following:

     -  A  preliminary map  of the 48  conterminous states  In  terms  of   surface
        water alkalinity  (which  Is  an  index of  the  degree to  which   aquatic
        systems are  sensitive  to acidification)  was  completed.   The   map  Is
        one of  the  first  assessments  of  the sensitivity  of  surface  waters to
        acidity, and  will  be  used  to  document  the  extent  of  the problem.

     -  Aquatic  surveys  to  determine the sensitivity  of lakes and  streams to
        acidification In  the  New England  and middle-Atlantic  states  were com-
        pleted, and an analysis  of  surface  water acidification  trends  In the
        eastern and upper-midwestern parts of the  United  States was  initiated.
                                       E-21

-------
     -  An  adaptive  environmental assessment  workshop  on the  effects  of acid
        precipitation on fish resources  was  held to evaluate quantitative meth-
        ods for assessing  the impacts  of surface  water  acidification  on fish
        populations.

     -  Techniques for  evaluating the effects  of acid  precipitation  on  field-
        grown crops under more realistic  ambient conditions were developed, and
        an Inter-laboratory  study  involving  six  sites  (5  in the  United  States
        and 1 in  Canada)  was initiated  to evaluate the dose-response relation-
        ships of differing levels  of acidity on a single crop under  standardized
        experimental  conditions.

     Assessment.  The assessment program  continued to  provide support to  the Fed-
eral Interagency Task Force on  Acid Precipitation.   United States and  Canadian
scientists prepared a report  on pollutant transport across  international  United
States/Canada boundaries,  environmental  and health Impacts,  and  possible control
and policy strategies.


1982 Explanation of Changes from January  Budget Estimate


                     January          March         Current
                     Request          Request       Estimate

                  $9,037,400       $9,037,400     $9,022,400

     The net decrease of -$15,000  results from  the following action:

     -  Congressional Actions.  (-$15,000)  A  reduction  of -$15,000 was applied
     to the Salaries  and  Expenses appropriation  to meet Congressional  mandated
     appropriation level.

1982 Program

     In 1982, the  Agency  is allocating a  total  of  $9,022,400 and 4.0 permanent
workyears to this  program,  of which  $214,900 is  under the Salaries  and  Expenses
appropriation and  $8,807,500 is   for  extramural  purposes  under  the  Research
and Development appropriation.

     tlan-Made Sources.  An operational Utility Simulation Model Is being developed
and demonstrated at the  state level;  (2)  the  S02  emissions  Inventory  Is being ex-
panded, the integrated NOX  emissions inventory is being expanded; and (3) addi-
tional chemical  species  for emissions inventory development,  are  being  identified
and prioritized.

     Atmospheric Processes.  Atmospheric  processes research  on the  MAP3S program
and the Eastern North American Model for Air Pollution  (EMAMAP)  model  is contin-
uing.  The following major activities are being conducted.

     -  Three regional  trajectory (Lagrangian) models  are being made available
        to the user  community with user's manuals and other supporting  documen-
        tation.   The  trajectory   approach  is  being  deemphasized  with  greater
        emphasis being placed on developing a modular Eulerian grid.model  to the
        applied stage.  The shift to the Eulerian approach for long-range  trans-
        port and deposition Is  a  consequence  of the superior  manner in which
        complex flows and transformation  processes can be described.

     -  Comprehensive  analysis   of  the   OSCAR  field  experiment  data  set   is
        being completed.  The results  from this  analysis  are needed  to develop
        modules that  describe the removal  of  pollutants  from the atmosphere  by
        precipitation in frontal  storms.   Plans  for  a  similar  field  experiment
        to examine scavenging behavior in  convectlve  storms  are  being  initiated.
                                       E-22

-------
     -  Refinements to  the ENAMAP  model  to  include nitrogen  chemistry and  to
        incorporate more realistic deposition and transformation rates are  being
        completed.  A user's  guide  describing the new  model  revisions Is  being
        produced.

     Deposition and Honitoring.

     -  The Global  Precipitation  Chemistry Network is  continuing  through  inter-
        agency (NOAA and EPA) cooperation,  with data from  various remote  sites
        being examined for possible impacts of anthropogenic sources  of  sulfates
        and nitrates.

     -  Preliminary results  of  the Dry Deposition Methods  Intercomparlson  Field
        Study are  being  reported.  These  data  will   lead  to the  identification
        of suitable surface monitors to measure  the dry  deposition  of  pollutants-
        Field experiments assessing pollutant deposition to natural  surfaces  1n
        forests and croplands for various  atmospheric stability  classes are  being
        continued.

     Health and;£jj^1[ropenta1  ,Imttacts.*   Research on the  Impacts of acid deposition
on aquatic and terrestrialecosystems  and  materials  is being  continued.   Among
these projects are the following:

     -  An  evaluation of  the  historical  data  base for   the  acidification  of
        aquatic systems   in  the  upper midwest and  eastern  United   States  is
        being completed.   Acidification rates are being  determined  for
        different types  of aquatic systems.

     -  A  national   survey  of  the  extent  and  rate  of   the  acidification  of
        lakes, streams,  and groundwaters in the  United States  is being
        Initiated.

     -  An assessment  of  short-term mitigation measures  (liming)  to reduce  or
        eliminate the biological  consequences  of  the  acidification  of aquatic
        systems is being initiated.

     -  A pilot study is being  initiated  at several  forest sites  in  the eastern
        United States to evaluate the relationship between  the growth  of  selected
        forest species and add precipitation.

     -  Agronomic  studies  are  being   continued.   These   studies  are  designed
        to: (1)  determine  the Impacts   of  acid  precipitation  on perrenlal  crops
        which are exposed  to  acid precipitation throughout the year;  (2)  assess
        the stimulatory   and inhibitory effects of  acid  precipitation  on  crop
        yields; and (3)   evaluate  the  role of sulfate and   nitrate  components  in
        acid precipitation Impacts.

     Assessment.  EPA's  activities in the Federal  Interagency Task  Force will  be
continued.  EPA will: (1)  compile and  evaluate  cost and performance  Information
for alternative  mitigation measures;   (2)  Initiate  the  preliminary  integrated
assessment of acid precipitation research  results;  and (3)  evaluate coal  industry
capacity constraints on  physical coal  cleaning as a near-term mitigation  measure.

1983 Program Request

     The Agency requests a  total  of $12^029,100 and 7.0 permanent workyears for
this program,  of  which  5483,100  is  for the Salaries and  Expenses appropriation
and $11,546,000  is  for   extramural  purposes under the  Research and  Development
appropriation.  This  reflects  an increase  of  $268,200 and $2,738,500,  respec-
                                      E-23

-------
tively.  This increase  reflects  increased  support for all of the major  areas  of
research in the  Acid Precipitation program.   The 1983 program has  been planned
in conjunction with the Interagency Task Force on Acid Precipitation.

     Man-Hade Sources.  Man-made  sources  research will  include:  (1)  completion
of the  development  and demonstration  of an  Advanced Utility  Simulation  Model;
(2) an updating  of  the S02 and  MOX  emission inventories and the development  of
inventories for other priority chemical species; and (3)  development of a stream-
lined Industrial Combustion Emission Model.

     Atmospheric Processes.  Several  major milestones  1n the MAP3S/RAINE program
will be completed in 1983.

     -  The  regional  Eulerian  grid  model   will  be developed  to  an  applied
        stage, tested  against  the  best  available  data  bases,   and  compared
        with results from the same data sets obtained with the regional
        trajectory models.

     -  A major  field  experiment will  be conducted  to examine  the  chemistry and
        scavenging of  acidic  pollutants  in convective storms.  The experimental
        design will   be similar  to  the one  used in  the 1981  OSCAR experiment.
        Laboratory studies will  focus on Improving the air chemistry, the scaveng-
        ing in-cloud chemistry, and dry deposition modules.

     Deposi tlon and Mpnltori no.  EPA  will  be  taking  an increased  role in  the
development of  improved monitoring methods  for the National Trends  Network.   A
final report  on dry deposition  methods investigated during the  1981  and  1982
Intercomparison studies will be completed;  and Improved dry deposition parameters
derived from  the  direct  measurement  of atmospheric  sulfur  fluxes over a  pine
plantation will  be  developed.   In  addition,  if chemical  detectors  or methods
become available, measurements   of  dry  deposition  fluxes  of  nitrogen  dioxide,
ammonia, nitric acid and sulfurle acid will be made.

     Health and Environmental Impacts.   Research of the effects of acid precip-
itation on  aquatic  and terrestrial  ecosystems and  materials  will   continue and
include the following projects.

     -  An assessment of stone damage related to environmental exposure conditions
        and acid  deposition  will be  reported.   Additional  assessments related
        to other building materials will be Initiated.

     -  The  first  national   assessment  and  synthesis  of  the Impacts  of  acid
        precipitation on aquatic ecosystems will be conducted.

     -  An evaluation  of the potential health  Impacts  of the  release of metals
        from acidified  drinking  waters  will  be  completed.   The report  will
        focus on ground waters and community drinking water supplies.

     -  Research  which addresses the  biological Impacts  of acidification  will
        be expanded to focus  on procedures for predicting and validating the loss
        of fish  resources,  and  to  assess  the  effects  of acid precipitation  on
        aquatic foodchains.

     -  Research  which  assesses the  influence  of  acid  precipitation on  the
        mobilization and  transport   of nutrients  and potentially  toxic  metals
        from terrestrial  systems to   aquatic  systems  will   be continued.   The
        results of  studies analyzing  the  release  of aluminum from  soils  will
        be completed.

     -  A  site-specific  evaluation  of  acid  precipitation Impacts  on  forest
        productivity and an evaluation of the use of tree-ring analysis
        techniques for  regional  assessments of impacts will be completed.
                                      E-24

-------
     -  Research to  evaluate the impacts  of acid precipitation  on  chemical
        cycling and soil  processes within forest ecosystems will be continued.
        Procedures will  be  evaluated to relate nutrient  leaching  from  soils
        with impacts on forest growth.

     -  The  interactive  effects  of  acid  rain  and gaseous air pollutants  on
        the growth and yield of crops will  be evaluated.


     -  Dose/response  functions  Involving the effects  of acid precipitation
        on the growth and yield of a wide group of  annual crops  (soybean, snail
        grains, corn, and vegetables) and such perennial crops as alfalfa and
        forage species will  be developed.

     Assessment.  EPA's activities  under  the Interagency Task  Force  will  be
continued, aruf an integrated assessment of  acid precipitation research results
will be continued.   A systems analysis of the acid  precipitation phenomenon
will be conducted to Identify systematically areas of uncertainty.  An evalu-
ation of  the performance  and  associated costs  of  alternative  mitigation
measures will be conducted.
                                      E-25

-------
                                                ENERGY

                                           Oxldants Energy
                                    ACTUAL
                                     1981
             JANUARY
             ESTIMATE
               1982
                                   MARCH
                                  ESTIMATE
                                    1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Health Effects
 Salaries & Expenses
 Research & Development

Env1 ronmental Enijl neerl ng
 & Technology
 Salaries 4 Expenses
 Research & Development

Environmental Processes
 8 Effects
 Salaries 4 Expenses
 Research 8 Development
     $7.8      $10.1      $10.0
 $1.741.2   $1,211.1     $711.1
 $1,350.2   $1,825.3   $1,812.6   $1,745.2
 $6,627.5  $11,280.8  $10,780.8   $8,800.1
    $24.8
   $378.9
                                                        $410.9  -$1,334.3
                                                        $966.9  -$7,833.2
TOTAL:
 Salaries 8 Expenses
 Research & Development
 $1,382.8   $1,835.4   $1,822.6   $1,745.2    $410.9  -$1,334.3
 $8,747.6  $12,491.9  $11,491.9   $8,800.1    $966.9  -$7,833.2
Oxldants Energy
TOTAL
$10,130.4  $14,327.3  $13,314.5  $10,545.3  $1,377.8  -$9,167.5

-------




PERMANENT FULL-TIME HORKYEARS
Health Effects
Environmental Engineering
S Technology
Environmental
Processes S Effects
TOTAL PERMAHENT HORKYEARS
TOTAL HORKYEARS
Health Effects
Envl ronmental Engl neerl ng
& Technology
Environmental
Processes & Effects
TOTAL HORKYEARS
ENERGY
Oxldants Energy
ACTUAL JANUARY MARCH CURRENT ESTIMATE INCREASE- +
1981 ESTIMATE ESTIMATE ESTIMATE 1983 DECREASE -
1982 1982 1982 1983 VS 1982
(DOLLARS IN THOUSANDS)

.2 .1 .1
20.0 21.9 21.9 21.9 5.3 -16.fi
.1
20.3 22.0 22.0 21.9 5.3 -16.6

.2 .2 .2
28.5 32.8 32.8 30.8 8.4 -22.4
.1
28.8 33.0 33.0 30.8 8.4 -22.4

-------
                                     ENERGY

                               Oxidants Energy

BudgetmReguest,

     The Agency  requests  a total of  $1,377.800  and 5.3  permanent  workyears
for 1983, a  decrease of  $9,167,500 an 16.6  permanent workyears from  1982.
Included In  this  total  1s  $410,900 for Salaries  and Expenses  and $966,900
for Research and Development,  with  a decrease of  $1,334,300  and $7,833,200,
respectively.  This decrease primarily results from the transfer of the LIMB/
low NOX  burner  program  to the Multi-media  Energy  program, and  the curtail-
ment of the fundamental  combustion modification program.

Program Description

     The major  objectives of the Oxidants  Energy  program  are  to assess the
health and ecological effects  of ozone and  other photochemical  oxidants, and
to develop and  evaluate control  technologies for  oxldant precursors emitted
from energy  sources.   To  achieve these  objectives, the  research program 1s
designed to  Improve  EPA's ability to: (1)  quantify the adverse environmental
effects of ozone and other photochemical oxidants on crops and forest ecosys-
tems; (2) assess  and predict the long-term  health  effects of exposure to 03,
S02 and  NOg;  and (3)  minimize NOX emissions while  simultaneously maintaining
boiler efficiency and reliability.  The health and environmental effects data
are used by the Office of  Air,  Noise and Radiation (OANR) to review and revise
the ozone  criteria document.  The  environmental engineering  and technology
research is used  by  State and Regional air pollution  control  authorities to
establish and enforce cost effective  emissions regulations.

HEALTH EFFECTS

1981 Accompl1shments

     In  1981, the Agency used a total  of $1,749,000 for this program, of which
$7,800 was under the  Salaries and Expenses appropriation, and $1,741,200 was
for extramural  purposes  under the Research  and  Development appropriation.

     The data  collection  phase of  the Los  Angeles  epldenrlologlcal  study was
completed.  In  this  study,  groups of healthy  and asthmatic children were ad-
ministered pulmonary  function  tests on a weekly basis during the 12-week peak
smog season.  Data from these  tests,  as well as diaries kept by  the subjects,
will be  analyzed  as  soon  as  aerometric  data  on ozone, SOg and NOz are made
available by the California  A1r  Resources  Board and the South Coast Air Qua-
lity Monitoring District.  This  is  a  court-mandated study designed to assess
the relationship  between  ozone  levels and  pulmonary  problems in asthmatics.

1982 Explanation qf Changes  from January Budget Estimate


                      January         March         Current
                      Estimate        Estimate       Estimate

                     $1,221,200        $721,100

     The net decrease of -$1,221,200 results from several  actions, as follows:

     "   ja"!ja.>y " Marcn-  (-5500,100)  This  change  represented  a decrease of
     $500,100 from the  January budget, of which $100 was  for Salaries and Ex-
     penses and $500,000   was  for  Research  and Development.   This decrease
                                      E-28

-------
     resulted in a  reduction  of research on the health effects  of  ozone and
     other photochemical oxldants,  and  the elimination of  some  epedemiology
     research on  pollutants  from  conventional  coal  combustion  processes.

     -  Reprogramming. (-$721,100)  This reprogramming of -$721,100 will  per-
     mit a more  cohesive synthetic  fuels  research program.  The purpose  of
     this transfer  is  to provide  the  needed assessments to  be used  by the
     Agency in the  development of  standards and  criteria  for  the  emerging
     synthetic fuels  industry.   It  was  decided in  1982  that  all  synfuel
     related activities  in   the  energy  program  should  be  redirected  and
     reprogrammed into  the  energy  multi-media  program  so  that the  entire
     synthetic fuels  would  be reflected  in one  area.   This  reprograitmrl ng
     will permit a  more cohesive synthetic fuels  research program.   (This
     reprogramming was  Included  in  a  letter  to  Congress   on  December 16,
     1981.)

1982 Program

     The resources  for  this program in  1982 were transferred to  the  Multi-
media Energy program  to  conduct  research  in  support of the integrated  risk
assessment program.

1983 Program Request

     The Agency requests no resources for this program in 1983.

ENVIRONMENTALENGINEERIN6 AND TECHHOLOGY

1981 Accomplishments

     In 1981, the Agency used a total of $7,977,700 for this program, of which
$1,350,200 was under  the Salaries and  Expenses  appropriation and $6,627,500
was for extramural purposes under the Research and Development appropriation.

     Pilot scale testing of a new heavy  oil /low NOX burner in an  oil  field
steamer was completed.  This  research will  allow for the expanded production
of heavy  oil  without  degrading environmental quality in  some California and
Texas oil  fields  where  recovery  is  limited by  N0£  emissions.   Region  IX
and the  California Air  Resources  Board will   utilize  these data to  Issue
construction permits  and establish State  Implementation  Plans  (SIPs).   This
technology can also be applied to  conventional  oil  fired industrial  boilers.
Thus, the  results  will  have  an Impact  on the  review  and potential  revision
of the  New  Source  Performance  Standards  (NSPS)   for  industrial  boilers.

     A technology  assessment   report for  industrial  boilers was  completed.
This report  reviews  NOX control  approaches  (e.g.  combustion  modification
and flue gas treatment) that are ap!1 cable to industrial  boiler and evaluates
their effectiveness and  costs.  It will be  used  by  the  Office  of Air,  Noise
and Radiation to review the NSPS for industrial  boilers.

     A thirty-day,  long-term  NO* emission  monitoring  program  was  completed
for several industrial boilers that were equipped with combustion modification
for MOX control.   The long-term (thirty-day) evaluation of the staged refinery
heater revealed a 50  percent  reduction  1n  HOX emissions.  These  data  will  be
used by the Office  of Air  Quality Planning and  Standards (OAQPS) and Regions
IX and  VI for  issuing  Standards of Performance  and granting  construction
permits.

     The  results from the environmental  assessment of conventional combustion
systems were published.  The   report addressed residential  heating,  and  sta-
tionary, utility,  industrial,  and commercial combustion sources.  These data
will be used  OANR to assess  the  environmental  consequences of  NOX control.
                                      E-29

-------
     Screening tests of the LIMB technology were Initiated on a  1  million  BTU
per hour wall-fired boiler for two coal  types:  high-sulfur coal and low-sulfur
coal.

1982 Explanation of Changes from January Budget  Estimate


                      January         March         Current
                      Estimate       Estimate       Estimate

                   $13,106,100    $12,593,400    $10,545,300

     The net decrease of -$2,560,800  results from several actions,  as follows:

     -  January - March. (-$512,700)  This  change  represented a decrease  of
     $512,700 from the January budget, of  which $12,700 was for Salaries  and
     Expenses and $500,000  was  for Research and Development.   This  decrease
     resulted In fewer characterization tests of boiler performance and emis-
     sions at low NOX burner demonstration  sites.

     -  Congressional Actions.  (-$2,048,100) A reduction of -51,810,700  was
     taken against the March estimate  reflecting the  September  12? reduction
     to the Research and Development appropriation.  A portion of  this reduc-
     tion reflects the House and Senate  Conference  action  on our  1982 Appro-
     priation Bill  (-$808,700).  The additional  reduction  will  transfer work
     conducted extramurally to our In-house  staff.  The additional  reduction
     will transfer work conducted extraiiiurally to our in-house staff.  The  re-
     duction also will  reduce  exploratory  combustion  research and evaluation
     and.technology efforts (-$1,002,000).

        An additional reduction  of $237,400  was applied to  the Salaries  and
     Expenses appropriation  to  meet  Congressionally  mandated  appropriation
     levels.

     "  Transfer Authorlty.  (No Change)  The net change applied to this acti*
     vity Hs made up of a decrease of -$170,000  from Research and  Development
     and an  increase of +$170,000 to Salaries  and Expenses.  The  Salaries
     and Expenses  Increase  will  allow  lab  program  reviews, monitoring  of
     extramural projects, as well as, the conduct of more  program  evaluation.
     This Increase  will  also  provide Instrumentation, spare  and  replacement
     parts for the LIMB fundamental and pilot in-house projects.  In addition,
     coal and  sorbent  supplies for the  small pilot study  will be purchased
     with these  funds.   They  will  also  provide  for the Installation  of  the
     recently purchased  natural  gas-fired Spark  Ignition   (SI) engine.   The
     in-house fundamental  combustion  studies  will  be greatly enhanced  by
     the purchase  of new optical  components  for the  experimental  (rainbow)
     furnace and/or the industrial  boiler simulator (DSD).

1982 Program

     In 1982,  the  Agency   is  allocating  a  total  of  $10,545,300 and 21.9
permanent workyears to this program, of which $1,745,200 is under the Salaries
and Expenses  appropriation  and  $8,800,100  1s  for  extramural purposes under
the Research and Development appropriation.

     A burner manufacturer  is  being  selected to produce a  commercial  version
of the heavy  oil/low HOX burner,  and the  field evaluation  program  1$ being
initiated.  This project supports  Region IX  and the California  Air Resources
Board  In  issuing construction permits  and establishing SIPs.  The  research
also supports OANR in reviewing the NSPS for industrial boilers.
                                      E-30

-------
     The applicability of  1n-furnace  NOX reduction  to  domestically  designed
boilers and United States  coals Is  being  evaluated.  These data  will  be used
by OANR to assess the existing  standards of performance  for NOX.

     Performance testing of  combustion  modifications that are applicable  to
spreader stoker boilers  is being  completed,  and the results will  be  used  to
prepare application  guidelines  for boiler  manufacturers,  boiler  operators,
and by State and Federal  air pollution control authorities.

     Since industrial  process  combustors  represent a  large source  of NOX
emissions, combustion  modification  technologies,   such  as  reduced  primary
air, modification  of fuel injection  velocities, etc.,  are being  evaluated
on a  coal-fired  kiln.   This  project  supports  the  Office of  Air  Quality
Standards (OAQPS) industrial  combustion program.

     Experiments to  identify how the physical properties of coal are  related
to NOX emissions under fuel-lean burning conditions  are  being conducted, the
results will be utilized by OANR to  analyze NOX regulations.

     Many complying sources have been  drifting out of compliance, and  the Re-
gions have traced  this problem to poor  operational  and  maintenance practices
for pollution  control  devices.   Therefore,   an  operations  and maintenance
practice manual is being  developed for burner manufacturers and boiler owners/
operators to assure  compliance with regulations and to  assure that equipment
is operated in a safe and reliable manner.

     A pilot evaluation of a  one million BTU  per hour wall-fired  furnace with
simulated boiler  conditions  is being conducted  to   test S02 removal  by the
LIMB process.   The  test  will  verify the projected performances  indicated
by prior year bench-scale research.

19S3 Program Request

     The Agency requests  a total  of  $1,377,800  and 5.3 permanent  workyears
for this program, of which $410,900  Is for Salaries  and  Expenses  and $966,900
is for  Research and  Development.   This  reflects  a decrease  of  $1,334,300
and $7,833,200,  respectively.   This  decrease  results   from  the  transfer  of
research on  low NOX  burners and the Limestone Injection Multistage  Burner
(LIMB) to the Multi-media Energy program.  The decrease  also  results from the
completion of research in  assessing alternative  technologies for controlling
NOX emissions from stationary  Internal  combustion engines, and  Investigating
UOX emissions  control  by combustion  modification for  Industrial   process
combustion.  These latter research projects are at the engineering stage where
industry 1s  In a  better  position  to commercialize  our research  findings.

     The primary  objectives  of  this program  will be to  continue development
of the necessary  technical data to support regulatory development  and Imple-
mentation efforts, accelerate the commercialization of  cost-effective pollu-
tion control  technologies, and  allow  energy  production to increase  in  an
environmentally safe manner.  Specific  activities will Include:

     -  The long-term testing of the heavy oil /low NOX burner in  an oil  field
        steamer will  be completed.   This will provide OANR  with the technical
        data to determine  whether this  burner can be utilized for  oil  field
        steamers.

     -  An  evaluation  of  combustion  modification technologies   on  mass-fed,
        coal-fired stoker boilers will be completed.  Current estimates  indi-
        cate that coal-fired  boilers account for up to 75 percent of station-
        ary source MOX  emissions.  Therefore,   techniques  that  help  reduce
        NOX emissions and  are  more reliable and cost  effective  than  those
        currently being  used,  are needed  to permit the expanded  production
                                       E-31

-------
        and use  of  domestically  produced  fossil  fuels  while  maintaining
        ambient air  standards-   This  project  supports  the  Office  of  Air,
        Noise and  Radiation's  efforts  to  regulate Industrial  boilers  1n  a
        cost-effective manner.

     -  Fundamental combustion research will  continue  to focus on elucidating
        the Important Intermediates and reaction paths Involved In the forma-
        tion of NOX  in fossil  fuel  firing.   This  research will  assess  the
        range of emissions achieved, and the associated costs.  The data will
        be used In reviewing the industrial  boiler standard  of performance.

ENVIRONMENTAL PROCESSES AND EFFECTS

JJ8JJtecaiipl 1 shments

     In 1981, the Agency used a  total  of $403,700  for this  program,  of which
$24,800 was  under  the Salaries  and  Expenses  appropriation and  $378,900  was
for extramural  purposes under  the  Research  and Development  appropriation.

     Exposure systems to determine  the Impacts  of  ozone  on crop yield  were
Installed and field experiments were Initiated to evaluate crop yield effects
on major agronomic  crops  such  as  soybeans,  wheat, corn  and  potatoes.   The
results of these experiments  Indicated that the use  of a  chamber-free field
exposure system for evaluating  ozone Impacts on crops Is  useful  in screening
the effects of a large number of pollutants.

     Crop productivity models,  capable  of evaluating  the  interactive effects
of air pollution with other environmental  factors on crop yield, were develop-
ed.  These models provide the framework for  assessing  the economic consequen-
ces of air pollution  on the  agriculture Industry  so that  cost/benefit Issues
involving air pollution control  strategies can be addressed.

1982 Program

     The Agency 1s  not allocating  resources  for this program in 1982.   The
research for this program was completed in 1981.  Any  additional requirements
will be conducted in the base research program.

1983 Program

     The Agency requests no resources for this program in 1983.
                                      E-32

-------
                                                 ENERGY

                                      Gases And Particles Energy
                                    ACTUAL
                                     1981
             JANUARY
             ESTIMATE
               1982
             MARCH
            ESTIMATE
              1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 MS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Health Effects
 Salaries 4 Expenses
 Research 4 Development

Environmental Engineering
4 Technology
 Salaries 4 Expenses
 Research 4 Development

Environmental
.Processes 4 Effects
 Salaries A Expenses
 Research 4 Development

Monitoring Systems and
Instrumentation Development
 Salaries A Expenses
 Research A Development
    $25.0      $23.4      $22.9
 $1,570.3   $2,730.7   $1,930.7
 $1,304.7   $1,534.6   $2,338.1   $2,074.1   $1,803.7   -$270.4
 $6,715.5  $11,132.4   $6,236.4   $5,100.4   $3,282.2 -$1,818.2
   $620.6     $852.8   $1,054.1     $743.1     $283.0   -$460.1
 $5,072.9   $6,367.7   $5,267.7   $4,109.8   $3,250.5   -$859.3
   $150.3
 $1,044.9
  $215.3
$1,520.2
TOTAL:
 Salaries 4 Expenses
 Research 8 Development

Gases And Particles    TOTAL
Energy
 $2,100.6   $2,626.1   $3,415.1   $2,817.2   $2,086.7   -$730.5
$14,403.6  $21,751.0  $13,434.8   $9,210.2   $6,532.7 -$2,677.5

$16,504.2  $24,377.1  $16,849.9  $12,027.4   $8,619.4 -$3,408.6

-------
                                               ENERGY

                                     Gases And Particles Energy

                                   ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                    1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                               1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME WRKYEARS
Health Effects
Environmental Engineering
& Technology
Environmental
Processes S Effects
Monitoring Systems and
Instrumentation Development
TOTAL PERMANENT HORKYEARS
TOTAL HORKYEARS
Health Effects
Environmental Engineering

.4 .3 .3
19.5 19.8 25.7 25.7 18.7 -7.0

2.8 2.6 3.6 1.3 1.0 -.3

1.7 1.0

24.4 23.7 29.6 27.0 19.7 -7.3

.4 .9 .9
24.4 28.4 42.7 42.7 31.2 -11,5
& Technology

-------
                                                ENERGY

                                      Gases And Particles Energy

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE *
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Environmental                         10.6       21.4       27.1       12.8        5.6      -7.2
 Processes a Effects

Monitoring Systems and                 4.4        5.7
Instrumentation Development

TOTAL WORKYEARS                       39.8       56.4       70.7       55.5       36.8     -18.7

-------
                                      ENERGY

                           Gases and Particles Energy

Budget Request

The Agency requests a  total of $8,619,400 and 19.7 permanent workyears for 1983,  a
decrease of $3,408,000 and 7.3  permanent  workyears  from 1982.  Included  In  this
total is $2,086,700  for Salaries and  Expenses and  $6,532,700  for Research  and
Development, with  a  decrease  of $730,500  and $2,677,500,  respectively.   This
decrease in  resources  reflects  the transfer  of  the  LIMB/1 ow NOX  process  and
completion of visibility  modeling efforts, and a reduction  in  our research  on
complex terrain modelling efforts because of additional resources contributed  by
industry.
     The primary objective of  the Gases and Particles Energy program 1s to provide
the Office  of  Air,  Noise  and Radiation  (OANR)  and  enforcement  officials  with
scientifically credible data bases, methodologies, models,  assessments,  and  con-
trol technologies for gases and particles.  To achieve this objective,  the program
1s designed to:  (1) Identify and  characterize particles  in the air emitted  from
energy producing  sources;  (2) assess  the  transformation  and transport of  the
pollutants in the  atmosphere; and  (3)  develop and evaluate  more  reliable, cost-
effective technologies.  To comply with the  Clean Air Act Amendments  of 1977,
this information  is  used to  develop  State Implementation  Plans  and New  Source
Performance Standards, review  environmental Impact statements, and  conduct preven-
tion of  significant  deterioration  determinations  to  visibility  assessments.

HEALTH EFFECTS
1981 Accgmplijhnients

     In 1981, the Agency  used  a total of  $1,595,300  for this program, of  which
$25,000 was under the Salaries  and  Expenses appropriation and $1,570,300  was  for
extramural purposes under the Research and Development appropriation.

     The following studies will  provide  the  Office of A1r, Noise, and Radiation
with the data to revise the SOX  and participate  criteria documents.   The  results
of these studies will be available in 1982.

     - An ep1dem1ological study  was conducted to determine  the  pulmonary  effects
       of intermittently high ambient concentrations of sulfur oxides  and  partic-
       ulates on El  Paso school children*

     - The multi-year "Six-City" epidemiology study was completed.  This study was
       designed to provide a definitive assessment of the health effects of sulfur
       dioxide and respirable particulates.

     -  Two  human  clinical   studies were  conducted  to  determine the  individual
        and/or combined effects  of  sulfate aerosols,  ozone, and nitrogen  dioxide
        on normal, at-risk and diseased groups.

1982 ExplanationofChanges from January Budget Estimate

                January            (torch           Current
               Estimate          Estimate         Estimate

             $2,754,100        $1,953,600
                                      E-36

-------
     The net decrease  of  -$2,754,100 results  from  several  actions, as  follows:

     ~  "January - March.   (-5800,500)   This  change  represented  a  decrease  of
     $800,500 from  the January  budget,  of  which   $500  was  for  Salaries  and
     Expenses and  £800,000 was  for  Research  and   Development.   This  decrease
     resulted in  the   elimination  of  animal   inhalation  toxicology  studies  on
     the effects of conventional  combustion products.

     "  ReprMraro'nf-  (-$1,953,600)   This  reprogramming  of  -$1,953,600  will
     permit a more  cohesive  synthetic  fuels  research  program.   The purpose  of
     this transfer is  to provide the needed assessments to be used  by  the Agency
     in the  development  of standards  and criteria  for  the  emerging  synthetic
     fuels industry.   It was  decided In  1982 that all  synfuel  related  activities
     in the energy program should be redirected and  reprograntmed  into  the energy
     multi-media program so that the  entire  synthetic  fuels  would be  reflected
     in one  area.   This  reprogramming   will  permit  a  more  cohesive   synthetic
     fuels research program.   (This reprogramming  was Included  In  a   letter  to
     Congress on December 16,  1981.)

1982Program

     The resources for this program in  1982  were transferred to  the Multi-media
Energy program to  provide  support  for the integrated  risk  assessment  program.

1983 ProgramRequest

     The Agency requests no resources  for this program in  1983.

ENVIRONMENTAL ENGINEERING AMD  TECHNOLOGY

1981 Accompl1shroents

     In 1981, the Agency used a  total  of  $8,020,200  for  this  program, of  which
$1,304,700 was under the  Salaries  and  Expenses appropriation and $6,715,500  was
for extramural  purposes under  the Research and Development appropriation.

     Inhalable participate  (IP)  emissions from  major  sources  such  as  power
utilities, and pulp,  paper and  metal   industries  were quantified  and used  for
developing emission factors to support  OANR in establishing guides and/or  regula-
tions for IP 1n 1982.

     Two promising methods  for  controlling fugitive partlculate  emissions  were
Identified.  The  "road carpet" technique, which  entails  placing  a porous  layer
of material underneath road surfaces, will be  used  to control  fugitive emissions
from dirt roads.  The  "air  curtain" technique  which  is  simply a  barrier of  air
will be used  to deflect  wind from fine coll   piles,  and other  waste piles  at
comrnerfal  industrial facilities such as Iron and steel  facilities.

     An initial  assessment  of the  effectiveness  of  fabric-filter baghouses  for
controlling partlculate emissions from  utility boilers was conducted.  The results
indicated that  baghouses  might  be  capable  of meeting  the  revised  New  Source
Performance Standards   (NSPS)  for parti dilates.

     The reaction mechanisms  between sulfur oxides  and  limestone  were  defined in
bench-scale laboratory  tests   of the  limestone  injection  into  the  multistage
burner (LIMB) process.

     A permanent elect rostra tic predpltator (ESP) precharger with a trielectrode
configuration was constructed  at  the Bull Run Power Station.   A smaller,  transpor-
table and more  flexible precharger  designed  to address a variety of precharger/
collector combinations were also constructed.   The preliminary results of  tests
at the Bull  Run Station  indicated  installation costs  for  facilities   using  low
sulfur, high resistivity coals can be  reduced  by as  much as 50  percent.
                                       £-37

-------
     An electrostatic  fabric  filtration  (ESFF)  pilot  plant  was   constructed,
The preliminary  results  of  tests  on the  pulsed jet  mode,   which  is used pri-
marily for coal-fired industrial boilers, Indicated that size of the  bags  can  be
cut by one-half with increased collection efficiency.

1982 Explanation of Changes from January Budget Estimate

                January            March          Current
               Estimate          Estimate         Estimate

            $12,667,000        $8,574,500       $7,174,500

     The net decrease  of  -$5,492,500 results  from  several  actions,  as  follows:

                - March.    (-$4,092,500)   This  change  represented  a  decrease  of
     $4,092,500 from  the  January  budget,  of  which  +$803,500 was  an  increase
     for Salaries and  Expenses  and -$4,896,000 was a  decrease for Research  and
     Development.  This net  decrease resulted  In  the elimination  of four  pro-
     posed performance evaluations  of  fabric  filters  in utility  applications,
     and a reduction in the  following programs:   control strategies  for  conden-
     sable parti culates,  long-term performance evaluation of flue  gas desulfuri-
     zation systems, and fine parti cul ate matter emissions factors.

     -  Congressional Actions.   (-$1,400,000)   A  reduction  of  -$1,000,000   was
     taken against  the March  estimate  reflecting  the  September  12%  reduction
     to the Research and Development appropriation.  This reduction will  curtail
     in-house fundamental  research on fabric filtration and Electrostatic  precipi-
     tator (ESP) methods and several  technology transfer activities.

        An additional  reduction of $400,000 was  applied to the Salaries  and  Ex-
     penses appropriation  to meet  Congress! onally  mandated  appropriation  levels.

     -  Transfer Authority.  (No Change)  The net change applied  to this  activity
     is made up  of  a decrease  of -$136,000 from Research and  Development and an
     Increase of +$136,000 to  Salaries  and Expenses.  The Salaries and  Expenses
     Increase will  allow lab program reviews, monitoring  of  extramural  projects,
     as well as  conduct more program  evaluation  studies.  The  increase  will  also
     accelerate activities in  the fundamental  ESP and ESFF  projects and speed
     operation of  an  1n-house  partlculate scrubber  project.   It will  provide
     essential  support to  the Q.A.  program for project tracking and audit  documen-
     tation, and permit the  purchase of  Instrumentation equipment Important to
     several in-house experiments.

1982 Program

     In 1982, the Agency  is  allocating  a total of $7,174,500  and  25.7 permanent
workyears to this program, of which $2,074,100 is under the Salaries and Expenses
appropriation and $5,100,400  is for  extramural  purposes  under the Research 'and
Development appropriation.

     The cost-effectiveness  of  combined SOX  and partlculate  control  technologies
using dry-scrubbing  methods  is  being explored.  Research thus far  has  indicated
that SOX removal is  increased from 70% to 90% with the  addition of adipic add;
therefore this method is being assessed to evaluate the ability of this technology
to comply with the S02 emission regulations for utility boilers.

     Symposia and periodic reviews of the state-of-the-art on flue gas desulfuri-
zation are being conducted to transfer information  to the  program offices, Regions
and States.

     Testing at  the  Bull  Run Station is being completed.  Testing  of the trans-
portable ESP precharger facility is being initiated at the pilot  scale.
                                      E-38

-------
     Tests of the ESFF reverse air mode, which is used primarily for power plants,
are being initiated to assess the efficiency of this  concept  in  controlling par-
ticulate emissions when the size and number of  the bags is reduced.

     A pilot evaluation of a one million  BTU per  hour tangentially-fired  furnace
with simulated boiler  conditions  is being conducted  to test  SOX removal by  the
LIMB process.  The  test  will   verify  the  projected  performances  indicated  by
prior year bench-scale research.

1983 Program Request

     The Agency requests a total  of $5,085,900 and 18.7  permanent  workyears  for
this program, of  which $1,803,700  is  for Salaries and Expenses and  $3,282,200
is for  Research  and Development.   This  reflects  a  decrease   of $270,400 and  a
decrease of $1,818,200, respectively.  This  decrease  results from the  completion
of research on fugitive dust control  systems.   Data  on hand will  be transferred
to the  Regions and  States  for  their  use.   The decrease  also results from  the
transfer of  research  on  the LIMB  control  technology  to  the  Multi-media Energy
program.

     In 1983, the Energy  Gases  and Particles  Research program will  continue  to
emphasize activities  which  directly support  Agency  regulatory development  and
implementation efforts.

     Fabric filters  are an  important  control  option  for  utility and industrial
boilers.  Problems with temperature  sensitive fabrics,  partial  blockage of fabrics
with certain types of  particles, and other operational  problems need to be resolved
before the proper design and material  specifications can  be written.   Therefore
the field evaluation of conventional fabric  filter baghouse technologies  will  be
completed. This research  will  support the 1963  NSPS review for utility and indus-
trial boilers.

     Testing of the smaller, transportable  ESP precharger  will  be completed  at
the pilot scale for  different types of coal.

     Tests of the ESFF pulsed  jet  and reverse air  modes  will  be completed  at
the pilot scale.

     The Flue  Gas Desulfurization  (FGD)  information exchange  program will  be
continued, as will research to  develop the data base  to  prepare a  comprehensive
FGD technology assessment.  The  assessment will  address wet lime/limestone, adipic
acid, modified limestone  wet scrubbing, the aqueous  carbonate  process,  etc.   The
assessment will be used by OANR  to review the Utility Boiler NSPS.

     Operating and maintenance  procedure guidelines for major  gaseous and partic-
ipate control devices  will  be  developed.  These  guidelines are needed by  State
and local  governments  to  enforce air  emission standards, since many  complying
sources have been drifting out of compliance as a  result of the aging of critical
components, poor maintenance and improper operation.

     The utility  Industry has made  a major  commitment to  install the spray  dryer
S02 control technology as a  means  of  complying  with the  SOX  NSPS.   As compared
to wet scrubbers, the initial  capital  investment 1s much cheaper, and the annual-
tzed costs can be lowered by as much  as  30 percent.  Before  this  technology  is
cannier lei a 11 zed,  duration  of  the testing-time needs to be extended,  and the opera-
tional reliability and time  in  compliance need to be  documented.   Therefore,  an
engineering assessment of  the  high sulfur  coal  spray  dryer  will   be  conducted.
                                      E-39

-------
ENVIRONMENTAL PROCESSES AND EFFECTS

1981 Accomplishments

     In 1981, the Agency  used  a total of  $5,693,500  for this program, of  which
$620,600 was under the Salaries and Expenses appropriation and $5,072,900  was for
extramural purposes under the Research and Development appropriation.

     Sections 160-169 of the Clean  A1r Act (CAA)  establish  national  requirements
for prevention of significant deterioration of air quality.   The Act provides for
classification of  various  lands  into three  categories,  each  of which  receive
different protection  from  new   source impacts.   Class I (pristine areas  such  as
national parks) establish maximum allowable Increments of SOg and TSP for baseline
as well as visibility  protection.  The Impacts of proposed new sources, relative  to
these increments, must be evaluated before a permit for construction can be  issued.
Section 169{a)  of the Clean Air  Act  requires preserving visibility in pristine
areas.  Phase  I  regulations were promulgated  in 1980, and Phase II  regulations
are now underway  to provide for  protection  from visibility degradation  arising
from multiple sources scattered over reglonal-wide areas.

     The following  research will   supply  the  needed  information  necessary  to
evaluate pollutant effects on visibility  in Class I areas.

     -  A draft  user's guide  to  the Los  Alamos  Visibility Model  was  prepared.
        The model simulates the results of field studies.

     -  A final  report on model  simulations of  insolation  reductions  resulting
        from atmospheric haze was prepared.  This study was conducted to evaluate
        the potential  effects of solar energy loss on  crop productivity.

     -  The  Western  Visibility  Network  and fine  particle monitoring stations
        completed two years of data collection during  1981.   This effort provides
        baseline data for Federal  Class I area visibility protection, and  identi-
        fies sources of visibility Impairing aerosols.

     -  A baseline  study  to  monitor temporal and spatial variability of  visibi-
        lity In an  Eastern  Class  I Area completed  one year of  data collection.
        This study,  which  was  conducted in  the  Great Smoky Mountains National
        Park, is designed to determine the relative importance  of energy-related
        pollutants,  particularly  from nearby TVA  power plants,  on  visibility
        impairment.

     -  Field experiments  were conducted  in plumes embedded in a  hazy air mass
        to complete a  data base for the development of a plume visibility  impair-
        ment model.

     -  The  regional  haze in  the Southwestern  United States was  characterized
        with respect  to  its aerosol  chemical  composition,  source  contributions
        and the effects of coal-fired power plants on  visibility.

     Present dispersion models  used  for the permitting and siting of  power  plants,
smelters and synthetic  fuel  facilities  in  complex terrain are deemed unsatisfac-
tory by both industry and EPA.  Since complex terrain greatly affects the manner
in which  plumes  are  transported  and  dispersed,  there  1s a  need for  reliable,
field validated  complex terrain  models, 'especially  for areas   of  the  western
United States  where  energy  utilization  and  development  are rapidly  expanding.
Therefore, the  development  of  atmospheric dispersion models  for Targe  sources
in complex  terrain  was continued.   A major field experiment  to examine  plume
impaction on a single hill was  completed.  The  results of this  experiment,  along
with data collected from the ESRL physical  modeling facility, were used  to evalu-
ate several  existing models (Valley, Complex I, Complex II)  as well  as some  newly
created ones.
                                       E-40

-------
     The formulation and movement  of large-scale polluted air masses over  conti-
nental distances are  difficult  to  study and  evaluate  by  traditional  methods.
Changing energy patterns, such as fuels switching,  and  new energy development may
influence the  formation,  size and movement  of such air masses.   Data  from the
1980 field study of large-scale, persistent elevated pollution episodes  (PEPEs)
were analyzed  to develop a  scientific  undertanding pf  the  impact  of SOX and NOX
emissions on fine particle concentrations, clouds,  climate and  radiation balance.
Diagnostic models to  study large-scale polluted air masses  were also developed
from these  data.   This  information  is needed  to  support the  States  in the
development of emission limitations and SIP's.

     A replicated  field  test  was  conducted   with soybeans   to   determine  if
S02-induced plant changes  affect  the  development  of  insect  pests  under  field
conditions.  Results  suggest  that  beetle  populations  are  higher,  plant  damage
more severe, and yields lower in soybean plots  exposed  to SO? than in non-exposed
plots.  The interactive effects  of  502 and  other gaseous pollutants were  evalu-
ated to understand more  fully the Impacts  of  ambient  atmospheres  on crop yield
responses in the midwest and  northeast.  The  results  of field experiments have
shown that the exposure of  soybeans  to SOg and  NOg  separately had  no  effect
on the yield  of this  crop, but when  plants were  exposed  to both pollutants, a
greater than additive reduction  in yield occurred.  In other studies,  the  expo-
sure of field  tomatoes  to  SOg  and 03  cause a greater  reduction  in yield than
the exposure of plants to either of the pollutants  alone. These results indicate
that the  interactive  effects of multiple  pollutants  need  to  be  assessed with
regard to the establishment of standards for  criteria air pollutants.

1982 Explanation of Changes from January Budget Estimate

                January            March           Current
               Estimate          Estimate        Estimate

             $7,220,500        $6,321,800       $4,852,900

     The net decrease of -$2,367,600  results  from several  actions, as follows:

     •  January - March.   (-$898,700)   This  change represented  a  decrease  of
     $898,700 from  the  January  budget,  of which  +$201,300  was an  increase for
     Salaries and  Expenses and -$1,100,000  was  a decrease  for  Research and
     Development.   This  net decrease  resulted in a  reduction in  efforts for
     visibility modeling and field studies.

     ~  ggprogramninp.   (-$316,900)  A  reprogramming  of -$300,000  functionally
     transfers ttie  resources  supporting air and  hazardous  waste  monitoring in
     the energy research and  development program to the  air gases and particles
     program.  This  will provide better  management  of  these  programs in conjunc-
     tion with similar efforts.

        A second Agency-wide reprogramming provided resources for transfer  of the
     accountability  function to  the  Office  of Management Systems and Evaluation
     and, in addition, provided additional  resources for the Immediate Office of
     the Assistant Administrator for Solid Waste and Emergency Response.  There is
     no significant impact on the losing program activities  since their remaining
     resources are sufficient  to  support  personnel  and planned program activities.
     (-$16,900)  (These two reprogrammlngs,  totaling -$316,900, were included in
     a letter to Congress on December 16, 1981.)

     -  Congressional  Actions.   (-$1,021,200)   A   reduction  of  -$818,100  was
     taken against  the March  estimate  reflecting the  September 12% reduction to
     the Research and Development appropriation.   A  portion  of  this  reduction
     reflects the House  and Senate Conference action  on our  1982  Appropriation
     Bill  (-$522,400)  The additional reduction will reduce  efforts  in long-range
                                      E-41

-------
     transport research, as  well  as  cutback  the long-term  exploratory  research
     program (-$295,700).

        An additional  reduction  of (-$203,100) was  applied to the Salaries  and
     Expenses appropriation to  meet  the  Congressionally mandated  appropriation
     levels.

     -  Transfer Authority.  (-$130,800)  The net change applied to this activity
     1s madeup ofa decrease  of -5339,800 from Research and  Development  and  an
     Increase of +$209,000 to  Salaries  and Expenses.  The  increase will pay  for
     the laboratory's gas cylinder demurrage in 1981.

1982 Program

     In 1982, the Agency is allocating  a  total  of  $4,852,900  and  1.3  permanent
workyears to this program, of  which $743,100 is under the  Salaries and Expenses
appropriation and $4,109,800 is  for  extramural  purposes  under the Research  and
Development appropriation.

     In 1932, research  on visibility impairment fs  being  completed.  The  data
will be used  by  OANR  to develop  Phase II regulations which  are  scheduled  for
completion in 1984.   The following activities are being conducted:

     - A final user's guide for the Los Alamos visibility model is being completed.
       The report  will  provide  estimates  of  the  photographic  sensitivity  of
       visibility measurements or visibility model  outputs.

     - Visibility and  fine particle  sampling data  from  the  Western Visibility
       Network are being subjected  to Intense statistical  and  case-study  inter-
       pretive analysis.

     - A  final   report  describing  and  Interpreting the  two-year  baseline  of
       visibility data for the Great  Smoky  Mountains National  Park  1s being  com-
       pleted.  The  relative importance of bio- and anthropogenic  contributions
       are being addressed.

     - A  report  on visibility  impairment/plume  optics  model  intercomparison
       is being completed with recommendations for acceptable models.

     - A  report  on  television techniques  for pictoral  output  from plume  optics
       models will  be  available  for  user  application by Federal  Land  managers.

     - Development of a simple analysis procedure for regional  visibility effects
       1s being completed.

     A second field  experiment of  stable  plume  impaction is  being conducted  to
provide additional  data to develop and evaluate dispersion  models  for sources  in
complex terrain.   Updated modeling conclusions based on  field  and fluid modeling
experiments will  be  made available.   In support of  the complex terrain modeling
program, sensors to track plumes and obtain data on  plume geometries will continue
to be developed and evaluated.

     The development  of techniques for  studying the formation and  movement  of
Prolonged Elevated Pollution Episodes (PEPEs) will  be completed.   Field tests  of
the Improved tetroon tracking  system  will  be conducted.  The  tests will  analyze
the effectiveness of these systems when utilized  for distances of 1000 km  over
several days.  The analysis will Include comparisons with  other ground, air,  and
satellite tracking systems.  The  results  of these studies  wil  be  used  to  better
understand regional  transport of air pollutants.

     Special atmospheric tracers  have  been developed  that can  be  released  in
relatively small   amounts at  selected  sites  and. measured  accurately as  far  as
1000 km  from the  release  points.   These tracers,  which  are  used  to  validate
                                      E-42

-------
long-range transport  models,   need  to  be  standardized.   Therefore,  a   second
long-range tracer  experiment   Is   being  conducted  1n  the  northeastern   United
States.  In this experiment, tracers are being released In the Ohio River  Valley
and are being monitored  over distances  of  up  to 1500 tan in New York  and the  New
England States.

     Research to assess  the Impacts of SOX  and 03  mixtures  on agronomic  crops
is being continued  1n an  effort  to develop  dose/response  data  for  ambient  and
controlled levels of  air pollution.  This Information is a critical component of
the cost/benefit data  base needed to support the  development of  cost  effective
air pollution control  strategies.   Economic assessment models are  being modified
to provide  an  Initial  estimate of  the cost of  air pollutant  Impacts  on  the
productivity of  such  multi-billion  dollar  crops as soybeans, corn, peanuts,  and
cotton.  Crop growth  and yield models  are being developed  for various crops to
provide predictive techniques  for relating  crop production  to  various  air quality
strategies.  In  addition,  research  which  addresses  the  interactive  effects of
air pollutants and plant disease 1s being completed.  A final report which discus-
ses the potential Interactive  impacts of  plant disease,  insect feeding, and  air
pollutants on crop loss will be prepared.

1983 Program Request

     The Agency  requests a total  of $3.533,500 and  1.0  permanent workyear  for
this program, of which  $283,000  1s  for   Salaries  and  Expenses  and  $3,250,500
Is for  Research  and Development.   This   reflects  a  decrease of $460,100  and
$859,300, respectively. This  decrease  results  from the completion  of research
on visibility  and  residential  heating.   The  decrease  also  results  from  the
completion of research on  the  effects  of  SO? and S02/ozone  combinations on
crop growth.

     The primary focus  of  the 1983  program will  be to continue  the  development
of transport and fate  models   which support  regulatory  Implementation efforts
in a cost-effective manner at the Federal,  State and local  levels.

     Preliminary results of the full-scale plume 1mpact1on  study  1n complex ter-
rain will be available  for use in model development  and evaluation.   Applicable
field and fluid modeling results will be used  to present  updated modeling conclu-
sions.  Techniques  for the measurement of  plumes  In  complex terrain will be
summarized, and  data  collected during  the  full-scale plume impaction  study will
be evaluated.  The data  obtained  from these studies will  be used  for siting  and
permitting sources In complex terrain,  or for setting emission  standards  under
SIP's for these  sources.

     The results of  the second  long-range tracer  experiment. Cross  Appalachian
Tracer Experiment  (CAPTEX), will  be evaluated for use  in  a second  multi-state
field study  of  the  formation  and movement of large-scale  polluted  air masses.
This field study is scheduled for 1984.

MONITORING SYSTEMS AMD INSTRUMENTATION  DEVELOPMENT

1981 Accomplishments

     In 1981,  the  Agency   used a  total   of  $1,195,200 for  this  program, of
which $150,300  was  under the  Salaries  and Expenses  appropriation  and $1,044,900
was for  extramural  purposes  under the Research  and Development  appropriation.

     The UV-DIAL (Ultra-Violet Differential Absorption Lldar), which was original-
ly developed by  NASA, was  adopted for airborne ozone and sulfur dioxide measure-
ments.  This remote  sensing system has  been used  1h various field experiments to
improve the  understanding   of  atmospheric  chemical  processes and  the  transport
and dispersion of criteria pollutants.
                                      E-43

-------
1982 Explanation of Changes from January Budget Estimate
                January
               Estimate

             $1,735,500
  March
Estimate
 Current
Estimate
     The net  decrease  of  -$1,735,500  results  from  the  following  action:

     "  January - March.   (-$1,735,500)   This change represented a decrease of
     $1 ,/Jb.bUU from the January budget, of which $215,300 was for Salaries and
     Expenses and $1,520,000 was  for Research and Development.   This decrease
     resulted In the elimination of efforts to develop  Improved methods  to
     monitor visibility.

1982 Program

     The Agency  is  not allocating  resources for this program in 1982.   Any
additional  requirements will  be  conducted  in  the Gases  and Particles  Non-
Energy program.

1983 Program^ Request

     The Agency requests  no resources for this  program 1n  1983.
                                      E-44

-------
                                                ENERGY

                                    Hazardous A1r Pollutants Energy
                                     ACTUAL
                                      1981
             JANUARY
             ESTIMATE
               1982
              MARCH
             ESTIMATE
               1982
              CURRENT
              ESTIMATE
                1982
ESTIMATE
  1983
 INCREASE +
 DECREASE -
1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Health Effects
 Salaries 8 Expenses
 Research ft Development

Environmental Engineering
& Technology
 Salaries & Expenses
 Research 4 Development

Environmental
Processes 4 Effects
 Salaries 8 Expenses
 Research S Development

Monitoring Systems and
Instrumentation
Development
 Salaries 8 Expenses
 Research S> Development
   $13.5      $13.2      $13.1
  $762.4   $1»504.5   $1,504.5
  $369.2
$2,219.4
   $10.2
  $379.8
   $79.2
  $339.5
  $577.3
$2,817.7
   $16.6
  $483.9
   $72. B
  $428.1
   $89,4
  $483.9
TOTAL:
 Salaries & Expenses
 Research 4 Development

Hazardous Pollutants   TOTAL
Energy
  $472.1
$3,701.1
  $679.9
$5r234.2
  $102.5
$1.968.4
$4,173.2   $5,914.1   $2,090.9

-------
                                                                 ENERGY

                                                     Hazardous Air Pollutants Energy

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                                 1982       1982       1982            1983 VS 1982
                 PERMANENT FULL-TIME HORKYEARS
o>
Health Effects

Environmental Engineering
* Technology

Environmental Processes
& Effects

Monitoring Systems and
Instrumentation
Development

TOTAL PEIWANENT HORKYEARS
.1
5.1
,2
1.0
.2
3.9
.2
1.0
                                                                                .2
                                                                              1.2
                                                        6.4
5.3
1.4
                 TOTAL HORKYEARS
                 Health Effects

                 Environmental Engineering
                 S Technology
                                        .5         .8

                                       7.9        8.4
            .8

-------
                                                ENERGY

                                    Hazardous Air Pollutants Energy

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Environmental                           .2        1.4        2.4
Processes 4 Effects

Monitoring Systems                     1.7        1.0
Instrumentation and
Development
TOTAL HORKYEARS                       10.3       11.5        3.2

-------
                                      ENERGY

                         Hazardous A1r Pollutants Energy

Budget Request

     The Agency requests no resources for this program in 1983.

Prog ram
     The major objectives  of  the Hazardous Air Pollutants (HAPs) Energy  program
were to develop the Information necessary to evaluate the effects of  potentially
hazardous air pollutant emission problems associated with conventional coal  com-
bustion and advanced (synfuel)  energy systems, and to evaluate alternative  control
technologies to mitigate  any  significant  problems which  were Identified.  The
research program consisted  of four major  components:   (1) the  characterization
of discharges and  the evaluation  of  cost-effective pollution  control options;
(2) the development  and  testing of bioassay  techniques;  (3)  the development  of
near-field air dispersion models for determining  general population exposures  to
hazardous air pollutants;  and (4) the  development of hand-held monitoring  systems
and other  instrumentation  for  measuring  HAPs  and assessing human  exposure  to
them in both indoor and outdoor environments.

HEALTH EFFECTS

1981 Accomplishments

     In 1981, the  Agency  used  a  total  of  $775,900 for this  program, of  which
$13,500 was  under  the  Salaries and Expenses appropriation and  $762,400  was for
extramural purposes under the Research  and  Development  appropriation.

     A lung  epithelial  cell  system,  which 1$  capable  of  directly metabolizing
pro-mutagens to mutagens,  was developed and is  being used  as a  feeder substrate
to assess  the  mutagenlcity  of low concentrations of  toxicants in  other  cell
types.  This testing methodology will  be utilized to provide mutagenic informa-
tion on those compounds being  considered for listing under  Sections  111  or 112
of the Clean Air Act.

1982 Explanation of Changes from January Budget  Estimate

                     January           March         Current
                    Estimate        Estimate         Estimate

                  $1,517,700       $1,517,600

     The net decrease  of  -$1,517,700  results from several  actions,  as follows:

     -  January - March.   (-$100)   This  change  represented  a  decrease  of  $100
     from the January budget for Salaries  and Expenses.  This  decrease resulted
     In no significant programmatic impact.

     -  Reprogramrolng.  (-$1,517,600)   This  reprogramming   of  -$1,517,600  will
     peril t a inore  cohes 1 ve synthetic  fuels  research  program.   The  purpose  of
     this transfer Is to provide the needed, assessments to be used by the Agency
     in the  development  of standards  and  criteria  for the  emerging synthetic
     fuels industry.  It was decided In 1982 that  all synfuel  related activities
     in the energy program should  be redirected and  reprogrammed into the energy
     multi-media program so  that the  entire synthetic  fuels  would  be reflected
     in one area.   This reprogramming  will  permit a more cohesive  synthetic  fuels
     research program.  (This reprogramming was Included in a letter  to Congress
     on December 16, 1981}.
                                       E-48

-------
1982 Program

     The resources for  this  program 1n 1982 were transferred  to  the  Multi-media
Energy program to  conduct  research 1n support of the  Integrated  risk assessment
program.

1983 Program Request

'    The Agency requests no resources 1n this program in 1983.

ENVIRONMENTAL EMGINEERIH6 ANDJICHMOLOGY

1981 Accomplishments

     In 1981, the  Agency used  a  total of  $2,588,600  to this  program, of  which
$369,200 Is under  the Salaries  and Expenses appropriation and $2,219,400 1s  for
extramural purposes under the Research and Development appropriation.

     The National  Institute  of Occupational Safety  and Health (HIOSH) study  to
determine total   daily  exposure to  Indoor and outdoor contaminants  by  selected
worker groups and their families was completed and remedial  measures for  reducing
Indoor radon  concentrations  1n  new  and  existing  buildings  were  evaluated.
Preliminary site  visits to  evaluate  worker  1n-plant pollutant  exposures  and
control technology performance  were  completed as  part of  the  joint MIOSH/EPA
assessment of 24-hour  exposures by  workers and their  families  to  environmental
contaminants.  In addition, support for the  activities of the Interagency  Research
Group on Indoor Air Quality was provided.

     A conference  on  residential  wood combustion  was  conducted  and  proceedings
of the  conference  were prepared.   The  conference  was  co-sponsored  by  EPA's
Industrial Environmental  Research  Laboratory  and  the Wood  Heating Alliance.
Sessions at the conference dealt with: wood combustion environmental assessments;
the efficiency and emissions of residential  wood heating  units;  emission  control
techniques for wood  burning appliances;  and  issues  related to  the  residential
combustion of wood and how they may be resolved.

     The Combustion  Modification  Environmental  Assessment  (CMEA)  provided  an
evaluation of organic  and  trace specie emissions  on equipment modified  for  low
NOX operation.   Data  were  collected  under  baseline  and low  NOX operating
conditions where  possible.   This  type of  comprehensive  assessment  allows,  an
evaluation of the  potential  for Increased emissions of hazardous air pollutants
under modified combustion conditions.

     A nine-volume report on emissions from conventional combustion  systems  was
completed.  Source  categories  included   gas-and  oil-fired  residential   heating
sources, Internal combustion sources, external  combustion sources for electricity
generation, commercial/Institutional combustion sources and Industrial combustion
sources.  A chemical  characterization of all air, water and solid waste emissions
from each of the 162 sites examined was Included.

1982 Explanatlon of Changes from January Budget Estimate


               January             March             Current
              Estimate           Estimate           Estimate

            $3,395,000

     The net decrease of -$3,395,000 results from the following action:
                                       E-49

-------
     ~  January - March.  (-$3,395,000)   This  change represented  a decrease  of
     $3,395,OutJ from the January  budget,  of which $577,300 was for  Salaries  and
     Expenses and $2,817,700  was  for Research  and  Development.   This  decrease
     resulted 1n no change  to methods for  examining  various air clean  up devices
     and removal of asbestos from building materials.

1982 Program

     The Agency  Is not allocating  resources  for  this  program  In 1982.   The
research was  completed  In  1981.   Any  additional  requirements   Mill  be con-
ducted In the base research program.

1983 Program Request

     The Agency requests no resources for this program 1n 1983.

INVIROMMEMTAL PROCESSES AMP EFFECTS

1981 Accomplishments

     In 1981, the  Agency used  a  total  of $390,000  for  this  program, of  which
$10,200 was  under  the  Salaries and Expenses  appropriation  and  $379,800 was  for
extramural  purposes under the Research and Development appropriation.

     The mobile aerosol reaction chamber was  successfully tested  using surrogate
mixtures and effluents  from an  on -fired  boiler.  The results  Indicate  that  the
reactivity of the chamber  Is  comparable  to other chambers;  thus,  1t can  be used
to assess  the  risk  of  hazardous  compounds as  either  primary  or   secondary
pollutants.  This Information  Is  needed to decide whether  a specific  pollutant
should be listed under Section 111 or 112 of the Clean A1r Act.

1982 Explanation of Changes from January Budget Estimate

               January             March           Current
              Estimate           Estimate          Estimate

              $500,500           $573,300

     The net  decrease  of  -$500,500 results  from several  actions, as  follows:

                -Jterch.  (+$72,800)  This change   represented  an  Increase   of
     $72,flt)0 from the  January  budget for  Salaries and Expenses.  This  resulted
     in accelerated  research  on  the  transport  and  transformation  of  polar
     pollutants and organic participates.

     "  Reprogrammjng.  (-$573,300)  This  reprogramrning of -$573,300  will  permit
     a more  cohesive  synthetic  fuels  research program.   The purpose  of  this
     transfer is to  provide  the  needed assessments to  be used by the  Agency  in
     the development of standards  and criteria for the emerging  synthetic  fuels
     Industry.  It was decided in  1982 that  all  synfuel related activities  in
     the energy program should be redirected and  reprogrammed Into the  energy
     multi-media program  so  that  the entire  synthetic  fuels would be  reflected
     in one area.   This reprogrammi ng will permit a more cohesive synthetic fuels
     research program.  (This reprogramnrtng was  included  in  a letter  to Congress
     on December 16,  1981).                '

1982 Program

     The resources for the program in  1982  were transferred  to  the  Multi-media
Energy program to conduct research in support of  the  Integrated  risk assessment
program.
                                     E-SO

-------
1983 Program Request

     The Agency requests no resources for this program fn 1983.

HONITORIjjG SYSTEMS AND INSTRUMENTATION DEVELOPMENT

1981 Accomplishments

     In 1981, the  Agency used  a  total   of  $418,700 for  this  program, of  which
$79,200 was  under  the  Salaries and  Expenses  appropriation and  $339,500 was  for
extramural purposes under the Research and Development appropriation.

     A new passive personal  monitoring device was developed to sample  vapor-phase
chlorinated hydrocarbons at the  parts  per billion  level.  This  device  can  be
used to obtain data on  actual  human  exposure  to various hazardous air pollutants
such as  benzene.   Also, a  portable  mass  spectrometer,  weighing  less  than  35
pounds, and capable of detecting minute molecules and molecular  fragments  (masses
of 12 to 300 atomic mass units) was proven effective in  two separate field studies.
Such lightweight devices can  be used in  the  field  to measure  concentrations  of
toxic air pollutants at waste sites.

1982 Explanatiori of Changes fj^_JanujryJj.u_([getEstimate

               January             March            Current
              Estimate           Estimate          Estimate

              $500,900

     The net decrease of -$500,900 results from the  following action:

     ~  January - March. (-$500,900)   This  change  represented  a decrease  of
     $500,900 from the  January budget,  of which  $72,800 was  for Salaries  and
     Expenses and  $428,100 was  for  Research  and   Development.   This decrease
     resulted in the  elimination  of the  Research  and  Development of exposure
     monitoring hardware.

1982 Program

     The Agency did not request any resources for this program in  1982.

1983 Program Request

     The Agency requests no resources for this program in 1983.
                                       E-51

-------
                                                EHERGY

                                         Mater Quality Energy
                                    ACTUAL
                                     1981
           JANUARY
           ESTIMATE
             1982
          MARCH
         ESTIMATE
           1982
         CURRENT   ESTIMATE INCREASE +
         ESTIMATE    1983   DECREASE -
           1982            1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Environmental
Processes 8 Effects
 Salaries 4 Expenses
 Research * Development

Monitoring Systems and
Instrumentation Development
 Salaries 4 Expenses
 Research S Development
  $397.5     $913.3     $905.1     $669.9
$8,650.0   $8,990.2   $4,590.2   $2,589.2
  $125.8
  $746.1
$146.0
$985.4
$145.0
 $85.4
                                          -$669.9
                                        -$2,589.2
TOTAL:
 Salaries 4 Expenses
 Research 8 Development

Water Quality Energy   TOTAL
  $523.3   $1,059.3   $1.050.1     $669.9
$9,396.1   $9,975.6   $4,675.6   $2,589.2

$9,919.4  $11,034.9   $5,725.7   $3,259.1
                                          -$669.9
                                        -$2,589.2

                                        -$3,259.1
PERMANENT FULL-TIME WORKYEARS
Environmental
Processes S Effects

Monitoring Systems and
Instrumentation Development
     1.7
     2.0
   5.0
   1.7
   5.0
   1.7
2.9
-2.9

-------
                                                ENERGY

                                         Mater Quality Energy

                                    ACTUAL    JANUARY     MARCH     CURRENT    ESTIMATE  INCREASE +
                                     1981     ESTIMATE   ESTIMATE    ESTIMATE     1983    DECREASE -
                                                1982       1982       1982            1983 VS 1982
TOTAL PERMANENT WORKYEARS
 3.7
6.7
6.7
2.9
-2.9
TOTAL WORKYEARS
Environmental
Processes * Effects

Monitoring Systems and
Instrumentation
Development
 7.5       15.6       15.6       11.5
 3.1
1.7
1.7
                                         -11.5
TOTAL HORKYEARS
10.6       17.3       17.3       11.5
                                         -11.5

-------
                                      ENERGY

                               Water Quality Energy

Budget Request

     The Agency requests no resources for this program  1n  1983.

Program Description

     The primary objective  of  the  Water  Quality  Energy  program  was to assess
the environmental   transport,  fate  and  effects of  energy-related  pollutants  on
the aquatic  environment.   The  program  MBS  designed to:   (1J  determine  the
qualitative and quantitative effects  of energy-related pollutants  on  freshwater
and estuarlne  environments;  (2)  assess the  ecosystem  risks  associated with  the
extraction, processing, transportation and use of  fuels; and  (3)  develop measure-
ment techniques to evaluate the  presence of  pollutants  In  aquatic  ecosystems.

ENVIRONMENTAL PROCESSES AND EFFECTS

1981 Accpinpl Ishmentg

     In 1981, the  Agency  used  a total  of  $9,047,500 for  this  program, of  which
$397,500 was  under the Salaries  and Expenses appropriation and $6,650,000  was
for extramural purposes under the Research and Development appropriation.

     An assessment  to  Identify  the  trace  elements   found  1n  sediments  and
Indicator organisms exposed  to power plant  wastewater effluents was  completed.
Trace elements  such  as cadmium,  lead and arsenic were found.   This  Information
will be  used  by  the  Office  of  Pesticides  and  Toxic  Substances  to  assess  the
toxicologic impact of these elements.

     The collection of  data  on the  fate, effects and  distribution of  cadmium 1n
flowing water  systems  was  completed.  These  data  will  be  utilized  to  develop
models to  predict  the transport,  fate  and effects of  cadmium 1n  surface  water
systems such as lakes or streams.

     A report  on the  fate,  sources  and cycling of mercury;  the  concentration of
selenium 1n  bottom sediments  and  fish tissue;  and  the  extent of  groundwater
contamination by mercury  in  the Fort Union coal  formation in  the  Northern  Great
Plains was  completed.   The  results  indicated  that  the  mercury  and  selenium
problem 1n  Northern Great  Plains  reservoirs  1s  naturally  occurring, and  that
coal mining  activities which  are  scheduled  to  Increase,  could  aggravate  the
problem.  This  Information  will  be  used  by Region  VIII  for  National  Pollution
Discharge Elimination permitting activities.

     A study  on the geochemistry of the Upper Fort  Union Lignite Strip Mining
area was completed.   Studies  Indicate that coal  mining In this  area  should pose
no real environmental  problems.

     Studies also  indicate that more than 50% of the cadmium  and zinc in Southern
Lake Michigan  comes  from  the  atmosphere.   This  indicates  that more  stringent
effluent control methods  need  not  be  employed for these  two heavy metals  since
their primary  source  is the atmosphere.  The  concentrations  of trace  metals  from
atmospheric loading 1n  Lake Michigan have  not  changed  significantly  between 1973
and 1979 with  the  exception  of lead and sulfate, which have decreased slightly.
This indicates  that air pollutant control  measures have been successful  1n  main-
taining the current air quality.

     Detailed studies  on  the chemical  characterization  of drilling fluids  used
1n the Texas  Flower Gardens Coral  Reef Banks were completed.   This  information
will be used  to assess and mitigate any adverse environmental  effects  that  could
result from offshore drilling.
                                       E-54

-------
1982 Explanation of Changes from January Budget Estimate

                January           March            Current
               Estimate         Estimate          Estimate

             $9,903,500       $5,495,300        $3,259,100

     The net decrease  of -$6,644,400 results  from several actions, as  follows:

     -  January - March.  (-$4,408,200)   This  change represented  a decrease  of
     $4,408,200 from the January budget,  of which $8,200  was for Salaries  and
     Expenses and  $4,400,000  was  for Research  and Development.   This  decrease
     resulted 1n the  elimination of  the Great  Lakes  research and the  offshore
     oil and gas program.

     -  Reprogramming.  (-$1,716,000)    This reprogrammlng  of  -$1,716,000  will
     permit a morecohesive  synthetic  fuels  research  program.   The purpose  of
     this transfer Is  to provide the  needed assessments to  be used by the Agency
     1n the  development  of  standards and  criteria for  the  emerging  synthetic
     fuels Industry.    It was  decided  1n 1982 that  all  synfuel  related activities
     1n the energy program should  be  redirected and reprogrammed Into the energy
     multi-media program so  that the  entire snythefic  fuels  would be  reflected
     1n one area.  This reprdgramming will permit a more cohesive synthetic fuels
     research program.  (This reprogrammlng  was  Included  in a letter  to  Congress
     on December 16,  1981).

     -  Congressiona1  Actipns.  (-$520,200)  A reduction  of -$426,500 was taken
     against the March estimate reflecting the September  12% reduction  to  the
     Research and  Development appropriation.  This  reduction will  result 1n  a
     reduced effort on  the  Impacts  of mining,  energy development  In  coastal
     ecosystems, and energy development in the West.

        An additional   reduction of  -$93,700  was  applied  to the  Salaries  and
     Expenses appropriation to meet Congressional ly mandated appropriation
     levels.

1982 Program

     In 1982, the  Agency 1s  allocating a  total  of $3,259,100 and  2.9  permanent
work/ears to this  program, of which $669,900 1s under the  Salaries and  Expenses
appropriation and  $2,589,200  Is for  extramural  purposes  under the Research  and
Development appropriation.

     An automated  Information  management  system  and  a  handbook  for  applying
ecological  Information data bases  to  coastal energy development activities  were
developed.  This system  and   handbook will  be provided to  State,  Regional,  and
local  response personnel  to facilitate their ability to take  remedial actions  at
the site of a spill.

     Research is being conducted to  obtain acoustical  particulate and  physical
oceanographic measurements of shunted  drilling fluids.  This  information  will
provide a basis  for  the  development  of  a  predictive  model  which will  attempt
to duplicate drilling  mud dispersion patterns.   The information will aid  Federal,
State and  local   officials  and Industrial  representatives  In  predicting  the
movement and  potential  Impact  of  these  materials  on   sensitive  ecosystems.

1983 Program Request

     The Agency requests no resources  for this program  in  1983.  Research in this
program will be  completed in 1982.   Any  further requirements will be  conducted
In the base research  program.
                                       E-5.5

-------
MONITORING SYSTEMS AND INSTRUMENTATION DEVELOPMENT

1981 Accompl i shments

     In 1981, the  Agency used a  total of  $871,900 for this  program,  of  which
£125,800 was under the Salaries and  Expenses appropriation and $746,100 was  for
extramural purposes under the Research and Development appropriation.

     Neutron activation was determined to  be a viable means of measuring  barium
at extremely low concentrations In marine waters.   Barium  Is the major  component
of drilling fluids.  No excessive  concentrations of barium  were  found  when  marine
water samples were  taken during  a  six-week scientific expedition  to the  Texas
Flower Gardens Coral  Reef Banks.   The levels of barium found are typical of other
Gulf of Mexico  areas.   Therefore,  preliminary  results Indicate  that drilling
muds can  be  discharged offshore  if  preventive measures,   such  as  shunting,  are
followed.

1982 Explanation of Changes from January Budget Estimate
                January
               Estimate
  March
Estimate
 Current
Estimate
             $1,131,400         $230,400

     The net decrease  of  -$1,131.400 results  from  several  actions, as  follows:

     -  January - March.  (-$901,000)    This  change  represented  a   decrease  of
     $901,000 from  tne January  budget, of  which $1,000  was  for  Salaries and
     Expenses and  $900,000  was  for  Research  and   Development.   This  decrease
     resulted In  the  elimination  of the  exposure  monitoring  research  program
     which was in support  of the  offshore oil  and gas program.

     "  ^Programming.  (-$230,400)   During  the  development  of the   operating
     plan, several  miscellaneous  reprogrammings,  which are  not  reportable to
     Congress, were made  to this  activity and  resulted  1n  a  net decrease of
     -$230,400.

1982 Program

     Resources for  this  program  were  transferred  to  the  Multi-media  Energy
program to  conduct  research  in  support  of  the   integrated   risk  assessment
program in 1982.

1983 Program Request

     The Agency  requests   no resources  for this  program   in  1983   as  a  result
of transfer of resources in 1982.
                                       E-56

-------
                                                                ENERGY

                                                        Drinking Water Energy
                                                    ACTUAL
                                                     1981
                                              JANUARY
                                              ESTIMATE
                                                1982
 MARCH
ESTIMATE
  1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
                PROGRAM
                                                             (DOLLARS IN THOUSANDS)
                Health Effects
                 Salaries 8 Expenses
                 Research S Development
                                     $16.7
                                  $1,937.5
m
tn
TOTAL:
 Salaries 8 Expenses                  16.7
 Research 8 Development           $1,937.5

Drinking Mater Energy  TOTAL      $1,954.2
                PERMANENT FULL-TIME HQRKYEARS


                Health Effects

                TOTAL PERMANENT WORKYEARS
                                        .2

                                        .2
                TOTAL MORKYEARS


                Health Effects

                TOTAL WORKYEARS
                                        .2

                                        .2

-------
                                      ENERGY

                              Drinking Water Energy

Budget Request

     The Agency requests no resources for this program in 1983.

Prggrain Description

     The primary objective  of the Drinking  Water Energy program  was  to provide
EPA's decision-makers  with  data  on  the   qualitative and  quantitative  health
effects of  exposure to  drinking  water  contaminated  with pollutants  associated
with energy-related  processes.   The research  results  of this program  have  been
used by the Office  of  Drinking Water to enforce the Safe Drinking  Water Act and
to establish  Maximum Contaminant  Levels (MCL)  for  organic  and  Inorganic  con-
taminants of  drinking  water.   Research  focused  on  those  pollutants  that  may
remain in  the  water  subsequent  to  customary   water treatment  and  on  those
pollutants that may  enter  groundwater via  seepage from mines, fly ash  ponds  or
synthetic fuel operations.

HEALTH EFFECTS
1981 Accompl1shments

     In 1981, the Agency  used a total of  $1,954,200 for this program, of  which
$16,700 was under the Salaries  and Expenses  appropriation and  $1,937,500  was for
extramural purposes under the Research and Development appropriation.

     Analytical procedures  were developed  to  evaluate extraction  systems  for
concentrating organic pollutants  In  drinking  water.  These  procedures  will  be
utilized by the  Office of  Drinking  Water as  a quick  means  of  evaluating the
presence of harmful  organic pollutants in human drinking water sources.

     The technology for detecting  the presence and quantity of  toxic  substances
that have  been Incorporated  into   hemopoietlc  stem  cells  was  developed.   The
presence of a  toxic  substance in this target cell  provides  putative evidence of
Its harmful effect relative to blood disease and leukemia.

     A preliminary  study  Indicated that  a photographic analysis  of  sperm head
dimensions as  compared to  an  analysis  of  semen  volume,  sperm  count,  sperm
mobility and sperm  morphology is a highly  sensitive indicator of exposure to a
chemical  pollutant.   The  results of this research will  be utilized  primarily by
the Office of Pesticides  and  Toxic  Substance as a  screening  method for detecting
the presence of chemical pollutants.

1982Program

     The Agency  1s   not  allocating  resources  for  this program  In  1982.   The
research was completed  in 1981.  Any additional  requirements  will  be conducted
In the base research program.

1983 Program Request

     The Agency requests no resources for this program In 1983.
                                        E-58

-------
                                                ENERGY

                                    Industrial Wastewater Energy
                                    ACTUAL
                                     1981
            JANUARY
            ESTIMATE
              1982
 MARCH
ESTIMATE
  1982
CURRENT   ESTIMATE INCREASE *
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Environmental Engineering
S Technology
 Salaries I Expenses
 Research 4 Development
$1,007,3   $1,120.5   $1,113.0     $896.8
$1,427.0   $2,324.0   $1,924.0
                                -$896.8
TOTAL:
 Salaries 4 Expenses
 Research 4 Development

Industrial Hastewater  TOTAL
Energy
$1,007.3   $1,120.5   $1,113.0     $896.8
$1,427.0   $2,324.0   $1,924.0

$2,434.3   $3,444.5   $3,037.0     $896.8
                                -$896.8


                                -$896.8
PERMANENT FULL-TIME WQRKYEARS
Environmental Engineering             15.5       14.4       14.4       14.4
& Technology

TOTAL PERMANENT HORKYEARS             15.5       14.4       14.4       14.4
                                                         -14.4


                                                         -14.4

-------
                                                               ENERGY

                                                   Industrial Wastewater Energy

                                                   ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                    1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                               1982       1982       1982            1983 VS 1982
               TOTAL HORKYEARS
               Environmental Engineering
               J Technology

               TOTAL WORKYEARS
i
at
25.8
25.8
29.0
29.0
29.0
29.0
26.0
26.0
-26.0


-26.0

-------
                                      ENERGY

                           Industrial  Wastewater Energy

Budget Request

     The Agency requests no resources for this program In 1983.

Program Description

     The primary  objectives  of  this  program were  to assure that  comprehensive
wastewater characterizations were performed and  adequate pollution  control  tech-
nologies were developed and evaluated  so as to provide the data base needed  for
the establishment  of  discharge  standards for liquid  effluents  from conventional
power plants, coal mining and coal  preparation facilities.

ENVIRONMENTAL ENGINEERING AMD TECHNOLOGY

1981 Accomplishments

     In 1981, the  Agency  used  a total  of $2,434,300  for this program,  of  which
$1,007,300 was  under  the  Salaries  and  Expenses  appropriation  and $1,427,000
was for  extramural  purposes under  the  Research  and Development appropriation.

     The major accomplishment  of this  program was the  completion  of a study  on
the relationship between emission regulations,  502  emission  control technologies
and the availability of compliance  coals.   This Information will be used  by  the
Office of Air, Noise  and  Radiation  to evaluate New Source Performance  Standards
for Industrial boilers.

     Laboratory testing  of an Improved fly ash sluicing system was also  completed
to help  reduce  the cost  of complying  with steam-electric effluent guidelines.

1982 Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                   $3,444,500      $3,037,000        $896,800

     The net decrease of  -$2,547,700 results  from  several actions, as  follows:

     -  January - March.   (-$407,500)   This  change  represented a  decrease   of
     $407,500 from  the  January  budget,  of  which  $7,500 was  for  Salaries  and
     Expenses and  $400,000 was for  Research  and   Development.   This  decrease
     resulted in a  reduction  of research on  wastewater from coal   and  oil  shale
     mining.

     -  Congressional  ActJons.    (-$2,140,200)   A reduction   of  -$1,924,000  was
     taken against the March estimate  reflecting the September  12%  reduction  to
     the Research and Development appropriation.  The reduction will affect  the
     incompletion of a  surface and ground  water coal  mining project.   Two  new
     projects of this nature will not be Initiated.

        An additional  reduction of  -$216,200 was  applied to  the  Salaries  and
     Expenses appropriation to  meet Congressional 1y mandated appropriation levels.

1982 Program

     In 1982, the Agency  is allocating  a  total of $896,800 and 14.4  permanent
workyears to  this  program,  all of  which  Is  under  the  Salaries  and  Expenses
appropriation.  Research  in  support  of  the Effluent   Guidelines  Division   1s
being conducted  to determine the presence  of priority  pollutants  in discharges
                                       E-61

-------
from offshore  oil  and  gas  drilling  operations  and  to provide  a  preliminary
characterization of wastewater discharges  from uranuim extraction.   Research  to
assess the surface and groundwater pollution Impacts of various  mining operations
is also being  completed.   This  Includes  both  source  characterization work and
studies of the cost-effectiveness of control alternatives.   In addition,  research
to characterize coal  slurry  pipeline discharge waters  to  answer questions con-
cerning potenlal  toxic  compounds  and  their  treatabillty  is  being  completed.
Research to  characterize  leachates  from tar  sands mining operations  is also
being completed.

1983 Program Request

     The Agency requests  no  resources  for  this program in 1983.   The  research
will be completed  In 1982.   Any additional  requirements  will   be conducted  in
the base research program.
                                       E-62

-------
                                                                ENERGY

                                                          Solid Waste Energy
                                                    ACTUAL
                                                     1981
                       JANUARY
                       ESTIMATE
                         1982
                      MARCH
                     ESTIMATE
                       1982
CURRENT   ESTIMATE INCREASE +
ESTIMATE    1983   DECREASE -
  1982            1983 VS 1982
                PROGRAM
                                                              (DOLLARS  IN THOUSANDS)
i
sf>
bl
                Environmental Engineering
                8 Technology
                 Salaries 8 Expenses
                 Research 8 Development
                TOTAL:
                 Salaries & Expenses
                 Research 8 Development
                Solid Haste
                Energy
TOTAL
             $260.3     $242.2
             $583.9   $1,138.0
$260.3     $242.2
$583.9   $1.138.0

$844.2   $1,380.2
                PERMANENT FULL-TIME HORKYEARS
                Environmental Engineering
                A Technology
                4.5
              2.0
                TOTAL PERMANENT WORKYEARS
                4.5
              2.0

-------
                                                ENERGY

                                          Solid Waste Energy
ACTUAL
 1981
                                              JANUARY
                                              ESTIMATE
                                                1982
                   MARCH
                  ESTIMATE
                    1982
                                                                    CURRENT   ESTIMATE INCREASE t
                                                                    ESTIMATE    1983   DECREASE -
                                                                      1982            1983 VS 1982
TOTAL WORKYEARS
Environmental Engineering
4 Technology

TOTAL HORKYEARS
6.4


6.4
                                                  5.9


                                                  5.9

-------
                                      ENERGY

                                Solid Waste Energy

Budget Request

     The Agency requests no resources for this program 1n 1983.

Program Description

     The primary objectives of this program were to provide continuous monitoring
of leachates  leaving  energy facility  disposal  sites and  to  develop methods  to
control pollutant releases  from  these  sites.  These data are needed  to  determine
the effectiveness of  solid  waste disposal  regulations that have  been promulgated
for utility and Industrial  boiler facilities  under the  Resource  Conservation and
Recovery Act.

ENVIRONMENTAL.ENGINEERING AND TECHNOLOGY

1981 Accomplishments

     In 1981, the  Agency used a total  of  $844,200  for  this  program, of  which
$260,300 was under the  Salaries  and Expenses  appropriation and  $583,900 was  for
extramural purposes under the Research and Development appropriation.

     The major accomplishment of this  program was  the  collection of field  data
at utility boiler sites.  These  data  are needed by the Office of  Solid  Waste to
define best  management  practices  for  the disposal  of  fly   ash  and  flue  gas
desulfurization sludge.

1982 Explanation of Changes from January Budget Estimate

                 January          March            Current
                 Estimate        Estimate         Estimate

               $1,380,200

     The net decrease  of -$1,380,200  results  from several actions, as  follows:

     ~  japgry - March.  (-$1,380,200)   This  change represented  a  decrease  of
     $1,380,200 from the January  budget,  of which $242,200 was  for  Salaries  and
     Expenses and $1,138,000  was  for  Research  and Development.  This  decrease
     resulted in the  elimination of  studies  to develop techniques  for  economic
     disposal of wastes from industrial boilers.

1982 Program

     The Agency  is not allocating  resources  for  this  program  in 1982.   The
research was completed  In 1981.   Any additional  requirements  will  be  conducted
in the base research program.

1983 Program Request

     The Agency requests no resources for this program in 1983.
                                        E-65

-------
                                                ENERGY

                                 Chemical Testing 4 Assessment Energy
                                    ACTUAL
                                     1981
            JANUARY
            ESTIMATE
              1982
 MARCH
ESTIMATE
  1982
CURRENT
ESTIMATE
  1982
ESTIMATE INCREASE +
  1983   DECREASE -
        1983 VS 1982
PROGRAM
                                             (DOLLARS IN THOUSANDS)
Health Effects
 Salaries 8 Expenses
 Research * Development

Environmental
Processes * Effects
 Salaries & Expenses
 Research S Development
   $10.0
$4,078.4
   $53.2
  $651.0
TOTAL:
 Salaries S Expenses                 $63.2
 Research 4 Development           $4,729.4

Chemical Testing        TOTAL     $4,792.6
S Assessment Energy
PERMANENT FULL-TIME HORKYEARS
Health Effects

Environmental
Processes ft Effects
      .4

      .2

-------
                                                ENERGY

                                 Chemical Testing 8 Assessment Energy

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
TOTAL PERMANENT HORKYEARS               .6


TOTAL WORKYEARS
Health Effects                          .4

Environmental                          1.0
Processes I Effects

TOTAL HORKYEARS                        1.4

-------
                                      ENERGY

                      Chemical Testing and Assessment Energy

Budget Request

     The Agency requests no resources for this program In 1983.

Program Description

     The objective  of  this  program VMS  to provide  EPA's  regulatory  decision-
makers with  scientific  Information  on  the health  and environmental effects  of
toxic pollutants  derived  from  energy  producing   sources.   The  research  data
obtained from  this  program  are  used  by the  Office  of  Pesticides  and  Toxic
Substances 1n Its  efforts  to Implement  and enforce the  Toxic  Substances  Control
Act (TSCA).

HEALTH EFFECTS

1981
     In 1981, the Agency  used  a total of  $4,088,400  for this program, of  which
$10,000 was under the Salaries  and Expenses  appropriation and $4,078,400  was for
extramural purposes under the Research and Development appropriation.

     The adverse  effects   of  cadmium,  lead,  and  zinc were determined  to  be
manifested at lower concentrations  in nutritionally deficient young and pregnant
animals.  The heavy  metals were  found to Influence  the placental  transport  of
essential nutrients.

     Prenatal exposure  of mice  to Polynuclear  Aromatic Hydrocarbons  (PAH)  was
found to  Induce temporary  postnatal   suppression  of  the  Immune   system,  while
postnatal PAH administration  predominantly  produced  liver tumors  1n  males  and
reproductive system  tumors 1n  females.    It was  also  determined  that prenatal
exposure to PAH  produced  sterility or a  severe  depletion  of the germ cells  1n
the offspring of  several  animal  species.   Chronic  Ingestlon  of  PAH was found to
produce cytogenic effects  1n the lymphocytes of  pigs-   Determinations  of tissue
residues of PAH  after Ingestlon of single doses by food animals  Indicated that
there might  be   a  significant  risk  to   man if these  animals  are exposed  to
sufficient quantities of  PAH.   Albumin  was  found  to  play a major role in the
transport of  PAH metabolites  in  human blood plasma.   This  information  will  be
used by  the  Office of  Pesticides and Toxic Substances in their  Premanufacture
Notification Review Process to  determine the hazardous  potential  of Polynuclear
Aromatic Hydrocarbons.

1982 Program

     The Agency  is  not  allocating  resources  for this program  in 1982.   The
research was  completed  in 1981.  Any  additional  requirements will  be  conducted
in the base research program.

1983 ^^ Program Request

     The Agency requests no resources in this program 1n 1983.

EH V I RONHEtlTAl PROCESSES AND EFFECTS

1981 Accomplishments

     In 1981, the Agency  used  a  total  of  $704,200 for this program, of  which
$53,200 was  under the Salaries and Expenses appropriation and $651,000  was for
extramural purposes under the Research and Development appropriation.
                                        E-68

-------
     Research indicated that  the effect  on  a blotlc  community  when exposed  to
P-cresol  in combination with  low dissolved  oxygen was more severe than  when  the
community was  exposed  to  the  toxicant  alone.   P-cresol  is  a  representative
compound used to  assess the  utility  of  closed-system microcosms in  predicting
the transport, fate and effects of pollutants in  water.

1982Program

     The Agency  is  not allocating  resources for this  program  in 1982,   The
research was completed  in  1981.  Any additional   requirements  will be  conducted
in the base research program.

1983 Plan
     The Agency requests no resources for this program in 1983.
                                        E-69

-------
I
-J
o
                                                               ENERGY

                                                        Municipal Spills Energy

                                                   ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                    1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                               1982       1982       1982            1983 VS 1982
(DOLLARS IN THOUSANDS)
PROGRAM
Environmental Energy
Technol ogy
Salaries & Expenses $211.8
Research 1 Development $361.7
TOTAL:
Salaries 5 Expenses $211.8
Research 8 Development • $361.7
Municipal Spills TOTAL $573.5
Energy
PERMANENT FULL-TIME HQRKYEARS
Environmental Energy 4.4
Technology
TOTAL PERMANENT HORKYEARS 4.4
TOTAL HORKYEARS
Environmental Energy 6.1
Technol ogy
TOTAL HORKYEARS 6.1
$120.0
$480.0
$120.0
$480.0
$600.0
4.0
4.0
4.0
4.0
$180.1
$406.1
$180,1
$406.1
$586.2
4.0
4.0
4.0
4.0
-$180.1
-$406.1
-$180.1
-$406.1
-$586.2
•4.0
-4.0
-4.0
-4.0

-------
                                      ENERGY

                             Municipal  Spills Energy


Budget Request

     The Agency requests no resources for this program In 1983.

Program Desertpt1 on

     The primary objective  of this program  was  to  develop,  evaluate  and  demon-
strate equipment designed  to prevent,  detect,  Identify, contain  or  remove  oil
released Into the environment.

ENVIROHHENTAI ENGINEERINGAMD TECHNQlpSY

1981 Accoinpl ishmen ts

     In 1981, the  Agency used  a  total   of  $573,500 for  this  program, of  which
$211,800 was under the  Salaries and Expenses appropriation and $361,700 was  for
extramural  purposes under the Research and Development appropriation.

     The effectiveness of the present oil spill prevention regulations 1n reducing
spills was assessed.  This Information 1s required by the Office of Water Programs
as part of  their mandate  under Section 311  of  the Clean Water  Act  to provide
guidance for Improved spill prevention systems and practices.

1982 Explanation of Changes from January Budget Estimate

                    January          March          Current
                   Estimate        Estimate       Estimate

                                   $600,000       $586,200

     The net  Increase of  +$586,200 results  from  several actions,  as  follows:

     i-  January - March.   (+$600,000)   This  change  represented  a  Increase  of
     S60u,uuu from the  January  budget,  of  which $120,000 was  for  Salaries  and
     Expenses and  $430,000  was for  Research  and  Development.   This  Increase
     resulted In  the continuation  of  priority  efforts  to  develop  techniques
     and technologies for field use in cleaning up oil  spills.

     -  Congressional Actions.  (-$13,800)  A  reduction of -$13,300 was applied
     to the and Research and  Development appropriation to meet the Congressionally
     mandated appropriation levels.

     -  Transfer Authority.  (No Change)  The net change applied to this activity
     1s made up  of a decrease  of -$60,100  from Research and Development and an
     Increase of +$60.100 to Salaries and Expenses for essential operating  costs.

1982 Program

     In 1982, the  Agency  Is allocating a  total  of  $586,200  and 4.0  permanent
workyears to this  program,  of which $180,100 is under the Salaries  and Expenses
appropriation and  $406,100  is  for extramural  purposes under  the  Research  and
Development appropriation.
                                      E-71

-------
     An assessment of oil spill clean-up equipment that 1s currently under develop-
ment or commercially available 1s being  conducted.  This  research  Includes an
evaluation of a  high-speed  inland water  skimming device, a  cold weather spill
clean-up system suitable  for use In the Arctic, and a low-cost method  for cleaning
beaches covered with oil.   In addition, user manuals on  chemical spill control
agents and oh  rapid analysis  procedures,  which can be  used in  the field,  are
being prepared.

1983 Program Request

     This program  was  transferred  to  the Hazardous  Waste  Non-Energy program
in 1983.
                                        E-72

-------
Management and
    Support
      SECTION TAB

-------
Page Intentionally Blank

-------
                                         MANAGEMENT S SUPPORT
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
                                             (DOLLARS IN THOUSANDS)
APPROPRIATION


 Salaries i Expenses

TOTAL, Management & Support

PERMANENT FULL-TIME HORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
Program Management
 Salaries I Expenses

Agency Management
 Salaries S Expenses

Regional Management
 Salaries & Expenses

Support Services
 Salaries « Expenses
$211,978.1 $256,921.7 $232,538.0 $221,057.8 $230,273.8  -$9,216.0

$211,978.1 $256,921.7 $232,538.0 $221,057.8 $230,273.8  -$9,216.0

   2,435.2    2,676.0    2,436.6    2,328.1    2,098.8     -229.3
   3,130.1    3,421.1    3,178.7    3,036.6    2,632.8     -403.8
$209,756.4 $224,931.0 $208,801.0 $237,468.5 $234,938.0  -$2,530.5
  $4,666.0
 $10,858.5  $13,630.0  $13,580.5  $12,182.4  $11,886.2    -$296.2
 $80,395.7  $97,792.0  $90,548.8  $85,401.7  $82,372.6  -$2,953.1
 $23,855.8  $28,013.9  $24,764.0  $24,028.7  $24,329.2     $300.5
 $96,868.1 $117,485.8 $103,644.7  $99,445.0 $111,685.8  $12,240.8

-------
MANAGEMENT 4 SUPPORT

ACTUAL
1981
JANUARY
ESTIMATE
1982
MARCH
ESTIMATE
1982
CURRENT
ESTIMATE
1982
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982
TOTAL PERMANENT WORKYEARS
Program Management
Agency Management
Regional Management
MANAGEMENT 4 SUPPORT
TOTAL WORKYEARS
Program Management
Agency Management
Regional Management
MANAGEMENT 4 SUPPORT
230.3
1,572.9
632.0
TOTAL 2,435.2
277.3
2,061.5
791.3
TOTAL 3,130.1
232.2
1,735.2
708.6
2,676.0
327.0
2,229.9
864.2
3,421.1
233.2
1,593.8
609.6
2,436.6
327.0
2,088.5
763.2
3,178.7
219.8
1,514.0
594.3
2,328.1
304.7
1,984.2
747.7
3,036.6
172.6
1,400.2
526.0
2,098.8
239.2
1,749.6
644.0
2,632.8
-47.2
-113,8
-68.3
-229.3
-65.5
-234.6
-103.7
-403.8

-------
                              MANAGEMENT AND SUPPORT


OVERVIEW AND STRATEGY

     Management and  Support  provides executive  direction  for all  EPA programs,
associated staff ami management  activities,  and those Agency-wide administrative
and support  services which are  not  assigned to  a specific program.  Tha  major
components are:  program management, Agency  management,  Regional  management,  and
support services.

     Our 1983  budget  reflects   two  major  reorganizations:  the  Office  of  the
General Counsel  and  parts  of the  Office of Enforcement were consolidated  into
the Office of Legal  and Enforcement  Counsel, and  the  Office of Planning  and Man-
agement was divided  into the  Office of  Administration  and  the Office of Policy
and Resource Management.  These  reorganizations target  resources  toward  our most
critical management activities,  eliminate considerable duplication of activities,
provide a consistent approach to Agency legal activities, and ensure  strong  and
coherent internal management control,

     Program management  includes  policy development,   program  development  and
oversight, and  the  associated  management activities  for  the Offices   of  Air,
Noise, and Radiation;  Water;  Pesticides  and Toxic Substances; Research  and  De-
velopment; and Solid Waste  and Emergency Response.

     The Agency management  component contains the Administrator,  Deputy  Admini-
strator, the Associate Administrator for Policy and  Resource Management,  the As-
sociate Administrator for Legal  and Enforcement Counsel, the Offices  of  the Gen-
eral and Regional Counsel  and the Office of Administration.

     The Regional management component  of this  media  includes  the Offices of the
Regional Administrators and those centralized management and administrative func-
tions performed in each region which are not associated directly  with a  specific
program.

     Support services contains  non-personnel costs for Agency services  such as
laboratory and office supplies,  building operations  and maintenance, local  tele-
phone service and other utilities,  telecommunications, rental  costs for our faci-
lities, and  central  computer  services.   There  are three components  within this
general category:  Agency,  Regional, and program support services.   Agency sup-
port services include all  office and building services for headquarters.  Research
Triangle Park, North  Carolina (RTP) and Cincinnati,  Ohio, as  well as  certain
Agency-wide services which are managed  on a  centralized level, e.g.,  facilities,
rent and ADP support costs.   Regional  support services  refer  to  common  services
in the Regional  offices, such as office supplies, equipment, printing, and local
telephones.  Program support funds provide general operating services to  specific
program facilities or laboratories.

     The scope of management and support activities  is  largely a  function of the
programs they serve.  The  level  of funding  requested for this media,  therefore,
supports the level of  program activity we anticipate.   Further,  the  request  re-
flects our belief that, by eliminating duplicatory functions,  focusing on essen-
tial services,  increasing  efficiency,  and   introducing  a  strong accountability
system, we  can  provide more   effective management  activities  at  less  cost.

PURPOSE OF; PROGRAH MANAGErCNT

     Program management covers policy formulation, program direction, and the as-
sociated management  activities which are performed within the  offices of the As-
sistant Administrators in each of EPA's five major program offices.  Included are
the Assistant Administrators and their  immediate staffs, the centralized manage-
ment staff of each program office,  and the program office directors and their in-
mediate staffs.
                                     MS-3

-------
     The program management  priority for  the  Office of  Water is to  ensure the
overall national implementation of  the  Clean Water Act, the Drinking  Water Act,
and portions of the Marine Protection and Sanctuaries Act.

     Within the Office of Pesticides and Toxic Substances, program management re-
sources will be used  primarily to  streamline  decision-making  processes  relating
to the pesticides and toxic substances laws and to ensure that  we uphold  our sta-
tutory mandates.  Resources also will be focused on efforts to  improve the scien-
tific and technical bases of our pesticides and toxics programs.

     Program management  activities  for  the Office  of Solid Waste and Emergency
Response include developing a  national  policy  and providing overall  direction to
ensure Implementation of the Resource Conservation  and  Recovery Act  and  the Com-
prehensive Environmental  Response, Compensation and Liability Fund.

     The Office of Air, Noise,  and Radiation program management resources provide
for the formulation and management of these three programs.  They assure  full Im-
plementation of the Clean Air Act and execution of EPA responsibilities under the
Atomic Energy Act,  and the Uranium Mill  Tailings Radiation Control Act.

     The resources  for program management for the Office of Research and  Develop-
ment provide the necessary  coordination and integration of  our various  research
efforts to ensure that we satisfy the needs identified by the program and Region-
al offices.

PURPOSE OF AGENCY JWNAGEJOT

     Agency management includes the Executive Offices  which consist  of the Ad-
ministrator and Deputy Administrator, their immediate staffs,  and the staff of-
fices which report to them directly, as well as the  Office of  the Inspector Gen-
eral.  These offices  provide  crosscutting Agency guidance  for  scientific review
of regulations  and research, congressional  and intergovernmental liaison activi-
ties, international environmental initiatives, civil  rights, public  affairs, ad-
ministrative law hearings,  and audit and  Investigative functions.  Although  we
have reduced this  component in total,  we are requesting  resources at  the full
1982 level for  the Office  of the  Inspector General   In order to  conduct  more in-
terim and  final  audits and provide better protection  from potential fraud and
malfeasance.

     Agency management also  includes the Associate  Administrator,  the immediate
office, and the legal  services components  of the  Office of Legal and Enforcement
Counsel (OLEC).  The Associate Administrator's  office provides  executive manage-
ment, planning, and budgeting  for the Office of the  General Counsel  and the Of-
fice of Enforcement  Counsel.   Legal  services  provides  advice  and  assistance to
the Administrator,  Regional  Administrators,  and other  Agency  managers through
the Office of  the  General  Counsel and the  offices  of the  ten  Regional Counsels.
This program provides  interpretations  of statutes,  reviews  major regulatory ac-
tions to assure legal defensibility, coordinates  with EPA's enforcement  efforts,
and handles, with  the  Department  of Justice, all litigation activities  in which
EPA is a defendant.

     The Office of Policy and  Resource  Management (OPRM),  also in this category,
provides Agency-wide policy analysis and development, regulatory control and anal*
ysis, and resource  and  budget control, planning, and implementation,  in addition,
we are developing  a  system for the Agency which will  establish  sound  management
and accountability control, provide a framework for a well-run  strategic  planning
and management  process, and ensure that  EPA's program objectives and environmental
goals are clearly defined and  met.  We will  emphasize a stronger and more coherent
regulatory development and  review process and will   improve both  the  process and
substance of regulatory  decision-making.    In  this  regard,  we  will enhance our
ability to measure the benefits associated with major regulations.

     The Office of Administration (OA)  1s  contained  within  this component.  The
OA provides Agency-wide  management  and  support  functions and administrative sup-
                                     MS-4

-------
port to EPA headquarters  and  our two largest  field operations —  Research  Tri-
angle Park (RTP), North Carolina and  Cincinnati,  Ohio.   In  addition, the  OA  pro-
vides certain  administrative  support  services  for  the  entire Agency,  including
buildings and facilities programming and nationwide  support  functions.

     Within the  OA,  we are developing  new  and  more efficient ways of  providing
services to the  Agency.   We  are providing guidance and assistance  to all  Agency
organizations 1n  streamlining  their operations.  We will enhance the efforts  of
our financial  management  offices to control  and account for  the  proper  expendi-
ture of federal  funds  and will strengthen  cash and credit management.   We  also
anticipate:  eliminating  duplicative   fund   control  activities  in  the  program
offices (through further automation of these  services), centralizing and  strength-
ening the Agency's information management activities,  and streamlining our grants
and contracts management  procedures to  accelerate processing  time  and to  reduce
the resources needed to administer these activities.

PURPOSE OF REGIONAL MANAGEMENT

     The Regional management  component  contains  resources  for the ten  Regional
Administrators and their immediate staffs; the  Regional staff offices conducting
civil rights,  congressional and  intergovernmental liaison activities, and public
affairs programs; and the Regional Management Divisions.  We  have  maintained the
level of  resources  necessary  in our  Regional   administrative  offices to  provide
services consistent  with   workforce  levels.   We have  increased  resources  for
audit coordination and  follow-up activities  1n  the  Regional finance offices, and
have maintained strong Regional planning and management.

PURPOSE OF SUPPORTSERVICES

     Agency support  services  provide  general   services  to   EPA  operations  in
Washington, DC;  Research  Traingle Park,  North  Carolina  (RTP),  and  Cincinnati,
Ohio.  It  also  includes the cost  of  some  general  services  for all Agency  pro-
grams, regardless  of  location,  which  are  managed  at  the  headquarters  level.
In this diverse category are:

     -  Office  Services - Common  services  including  laboratory  and office  sup-
        plies, office equipment maintenance, and printing support for our opera-
        tions in Washington, RTP, and  Cincinnati;

     -  Building  Services -  Utilities,  local telephone service,  routine  mainte-
        nance and minor modifications,  building maintenance contracts,  equipment
        rentals, guard  and  janitorial  services, and  employee  health  units  at
        headquarters, RTP, and Cincinnati;

     -  Library  Services  - Books,  journals,  equipment,  and  service  contracts for
        the headquarters library and the  branch libraries at  RTP and  Cincinnati,
        as well  as  specialized ADP services, literature  searches,  technical re-
        port processing, and Agency-wide library systems development;

     -  Nationwide Costs  - Agency-wide  costs for the rental  of space and associ-
        ated costs,  payments to the U.S. Postal  Service, Federal  Telecommunica-
        tions Service, security investigations, reimbursements to the Federal Em-
        ployees Compensation Fund, payments to the Public Health  Service for  com-
        missioned officers assigned to EPA, and contracts which support  the Agen-
        cy's occupational  health and safety program;

     -  ADP Services - Timesharing and  related data processing services provided
        to all Agency programs through contracts with commercial suppliers and in-
        house computer  facilities, development  and  operation  of AOP  systems
        serving  several user  programs,  and Agency-wide AOP management  oversight
        functions including  systems  audits,  requirements  analysis,  and  estab-
        lishment of  AOP technical standards;
                                     MS-5

-------
     -  Professional  Training - Funds for Agency-wide employee training programs.

     The Regional   support services  component covers  support  for  the  Regional
offices including  local   telephone   service,  guard  service,  rental  of  office
equipment, supplies,  printing, copying services,  and computer operations.

     The program support  resources  pay for support services  required  to operate
the laboratories of the Office  of Research and Development; the  Office of Pesti-
cides and Toxic Substances;  and the Office of Air, Noise, and  Radiation*  These
direct costs consist mainly  of  laboratory and office  services,  utilities, build-
ing maintenance, and  other housekeeping Items.

     We are  requesting  full  funding for those  fixed  costs  carried  within  the
Support Services accounts.   At  the  same  time,  we  are developing strategies  to
contain those costs over  which  we  have control.   In headquarters, for instance,
we are  consolidating  headquarters   personnel  within the  Waterside  Mall  complex
and instituting accountability systems for telephone and mail  services.
                                     MS-6

-------
                          MANAGEMENT AND SUPPORT


SUMMARY OF INCREASES AND DECREASES
                                                       (in thousands of dollars)
     1982 Management and Support Program	         $221,058.0

        Management.	           -3,025.0

        The decrease  results  from anticipated  reduc-
        tions in  workload  for  those management  func-
        tions such  as  personnel,  administrative,  and
        program management, and  other management  serv-
        ices whose resource  requirements  depend on the
        Agency's overall  workforce  level.   In  areas
        such as  Financial   and  Grants  and  Contracts
        Management, reductions reflect our expectations
        for reduced  workload  based  on  the  Agency's
        overall reduction in dollars.

        Support	          +12,241.0

        The increase  will  provide funding  for  antici-
        pated and  unavoidable  rate increases in  basic
        support areas  such  as   rent,  telephones,  and
        utilities set by the GSA.

     1983 Management and Support Program	,         $230,274.0


.SUMMARY OF CHANGES TO JANUARY 1982 BUD6E1JESTIMATC

                                                       (inthousandsofdollars)

     January 1982 Estimate			         $256,921.7

        January-March	•.	          -24,343.7

        Reorganization.,	              -40.0

        Reprogrammi ngs	.....	           +1,104.6

        Congressional Actions	          -15,478.5

        Congressional reductions of  $1,844,000  for the
        program management area  in the Office  of Air,
        Noise and  Radiation  ($250,000),  planning  and
        evaluation contracts ($500,000),  Office of
        Public Affairs  ($94,000),  Nationwide  support
        costs (3870,000), Office of Legislation
        ($61,900), and  Office  of Congressional  Liaison
        ($68,100) were applied to the Abatement, Control
        and Compliance  appropriation.   An  additional
        reduction of  $13,634,500  was applied  to  the
        Salaries and  Expenses  appropriation  to   meet
        Congressionally mandated  appropriation  levels.

        Transfer Authority	...'.	          +2,893.7

        An increase  of $2,893,700  was transferred  to
        Salaries and Expenses for these programs.

     Current 1982 Estimate	        $221,057.8
                                       MS-7

-------
Page Intentionally Blank

-------
  Program
Management
    SECTION TAB

-------
Page Intentionally Blank

-------
                                         MANAGEMENT 8 SUPPORT

                                          Program Management

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
PROGRAM
                                              {DOLLARS IN THOUSANDS)
Program Management
Office of Air. Noise
and Radiation
 Salaries & Expenses

Program Management
Office of Mater
 Salaries £ Expenses

Program Management
Office of Pesticides
and Toxic Substances
 Salaries & Expenses

Program Management
Office of Research *
Development
 Salaries ft Expenses

Program Management
Office of Solid Haste
and Emergency Response
 Salaries A Expenses
 $1,798.1   $2,931.6   $3,115.8   $2,316.0   $2,147.7    -$168.3
 $2,659.6   $3,478.7   $2,931.3   $2,682.0   $2,570.5    -$111.5
 $2,132.5   $3,244.9   $3,160.3   $2,691,1    $2,693.1       $2.0
 $3,830.1   $3,974.8   $3,818.4   $3,642.8   $4,011.5     $368.7
   $438.2
$554.7     $850.5     $463.4   -$387.1
TOTAL:
 Salaries ft Expenses
$10,858.5  $13,630.0  $13,580.5  $12,182.4  $11,886.2    -$296.2

-------
                                                            MANAGEMENT « SUPPORT

                                                             Program Management

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                   1982       1982       1982            1983 VS 1982
                                                                   (DOLLARS IN THOUSANDS)
                   Program Management     TOTAL

                   PERMANENT FULL-TIME HQRKYEARS
                                  $10,858.5  $13,630.0  $13,580.5  $12,182.4  $11,886.2   -$296.2
en
vo
Program Management
Office of Air, Molse
and Radiation

Program Management
Office of Water

Program Management
Office of Pesticides
and Toxic Substances

Program Management
Office of Research *
Development

Program Management
Office of Solid Waste
and Emergency Response
                                                          44.1       48.5       54.5       51.5       37.2      -14.3
                                                          51.4       50.2       43.5        43.0.       39.6       -3.4
                                                          48.2       51.6        49.6        46.5        40.0       -6.5
                                                          77.6       81.9        77.9        68.5       49.2      -19.3
                                                           9.0
7.7       10.3
6.6      -3.7
                   TOTAL PERMANENT WORKYEARS
                                      230.3      232.2      233.2      219.8      172.6     -47.2

-------
                                         MANAGEMENT * SUPPORT

                                          Program Management

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                1982       1982       1982            1983  VS 1982
TOTAL WORKYEARS
I
o
Program Management
Office of A1r, Noise
and Radiation

Program Management
Office of Hater

Program Management
Office of Pesticides
and Toxic Substances

Program Management
Office of Research *
Development

Program Management
Office of Solid Haste
and Emergency Response
                                                          48.0       63.7        69.7       64.7       47.8     -16.9
                                                          56.0       75.1        64.8'      62.0       56.6      -5.4
                                                          58.0       77.3        75.3       70.5       59.3     -11.2
                                                         103.8      110.9       106.9       94.6       66.8     -27,8
                                                          11.5
10.3       12.9
8.7      -4.2
TOTAL HORKYEARS
                                                         277.3       327.0      327.0      304.7      239.2     -65.5

-------
                             MANAGEMENT AND SUPPORT

                               Program Management

Budget Request

      The Agency  requests  a total of  $11,886,200  for Salaries and  Expenses  and
172.6 permanent workyears for 1983.  This Is a decrease of $296,200 and 47.2 per-
manent workyears  from 1982.   Overall,  these decreases result  from the reduction
In administrative and management  overhead  as  well  as the  emphasis  on  allocating
resources to higher priority programs.

Program Descri pt1 on

      The Program Management  component provides resources for the Assistant  Ad-
ministrators, Office Directors and their immediate staffs, for EPA's  five  major
program Offices: Air, Noise and Radiation; Water; Pesticides and Toxic Substances;
Research and Development; and Solid Waste and Emergency Response.   These resources
are used to provide centralized budgeting,  planning and management of the programs
and their resources, and coordination and Integration with other  Agency programs.

PROGRAM MANAGEMENT - AIR. NOISE  AMD RADIATION

1981 Accomplishments

      In 1981,  resources obligated were $1,798,100 for Salaries  and Expenses  and
44.1 permanent workyears for  this  component.   In addition to providing executive
management, planning and analytical support, budgeting and administrative support
for the Office  of Air,  Noise  and  Radiation  (QANR), resources  were focused  on  re-
authorization of  the Clean  Air  Act.   In 1981, the Office  was  reorganized  to  in-
clude A1r Enforcement responsibility.

1982 Explanation of Changes from January Budget Estimate

                    January          March            Current
                    Estimate         Estimate         Estimate

                   $2,931,600       $3,115,800       $2,316,000

     The net  decrease  of  -$615,600  results  from several  actions, as  follows:

     "  January - March.   (+$100,500)   This change  represented  an Increase  of
     $100,500 from  the  January  budget and  provided enhancement  to  centralized
     program management activities.

     "  Rco''9an1zatijoni.  (+$83,700)  This reflects the reorganization of enforce-
     ment actlvities.   This allows for  the  shift of  enforcement  responsibilities
     along with the management functions assumed in this office.

     -  Cpngressional  Actlons.  (-$799,800)  A  Congressional  earmarked reduction
     to this  activity was-$250,000  and was applied  to the Salaries and Expenses
     appropriation in final action on our 1982 Appropriation Bill.

        An additional   reduction  of  -$549,800 was applied to the Salaries  and
     Expenses appropriation to  meet the  Congressionally  mandated appropriation
     levels.

1982Program

      The Agency  is allocating $2,316,000 for Salaries and Expenses and 51.5 per-
manent workyears  in 1982.  Major emphases in 1982 are •implementation of the Clean
Air Act Amendments of 1977, the  Atomic Energy Act-and Uranium Mill Tailings Radi-
ation Control Act,  and  development of  major policies  related  to  these Acts.   In
                                      MS-T1

-------
addition, emphasis is being placed on the orderly phase-out of the Agency's Noise
Program.

1983 Program Request

      The Agency requests $2,147,700 in  Salaries  and Expenses and 37.2 permanent
workyears.  This decrease of  $168,300  and 14.3 permanent workyears from  1982  is
possible due to  savings  realized through improved efficiency  and elimination  of
the Noise program.   In  1983,  emphasis  will  be on  more effective  and efficient
planning, budgeting and  financial  management,  and administrative  support to  the
Air and Radiation programs.

PROGRAMMANAGEMENT - WATER

1981 Accompl i shiiients

      In 1981, resources  obligated  were $2,659,600  for Salaries and Expenses  and
51.4 permanent workyears.   These resources provide  executive direction  and  re-
source management for the Office  of Water.   Major activities and acconjpllshments
included the development  and  submission  of  amendments to the  Clean Mater Act  to
redirect the Construction Grants  Program and passage of the Superfund legislation,
along with development of regulatory and  implementation strategies for  that legis-
lation.

1982 Explanation of Changes from January Budget Estimate

                    January          March            Current
                    Estimate         Estimate         Estimate

                  $3,478,700       $2,931,300       $2,682,000

     The net  decrease  of -$796,700 results  from several  actions, as  follows:

     "  January - March.    (-$159,700)   This  change  represented  a  decrease   of
     $159,700 fromthe January budget  and reflects a  shift  from central  manage-
     ment functions to other program activities.

     "  Reorganization.   (-$387,700)   This  stiift  of resources  reflects  the  re*
     organizationof enforcement activities  allowing for the shift of  enforcement
     responsibilities along with management  functions assumed  in this  office.

     -  Reprogramming.   (-$20,500)  During the development of the operating plan,
     several miscellaneous reprogrammings, which are  not  reportable to Congress,
     were made to  this   activity  and  resulted  In  a  net  decrease of  -$20,500.

     *  Congressional Actions..  (-$228,800)   An additional  reduction of -5228,800
     was applieff^tb the Salaries  and Expenses appropriation to meet Congressional*
     ly mandated appropriation levels.

1982 Program

      In 1982, the Agency is  allocating 52,682,000  for Salaries and Expenses  and
43 permanent workyears.   A major focus of ,th1s program element In 1982 is to  im-
prove Office  of  Water management through  increased and better  program integra-
tion and redirection  of  major activities such  as Construction  Grants.   Another
focus is the  reauthorlzatlon  process for the  Clean  Water Act and the implementa-
tion of resulting amendments.

1983 Program Request

      The Agency requests 52,570,500 for Salaries and Expenses and 39.6 permanent
workyears*  This decrease of  $111,500  and 3.4 permanent workyears  from 1982  re-
flects the  overall  reduction  in  staffing for  the  Office of  Water.   The request
                                     MS-12

-------
supports the development and  Implementation  of a  reoriented  national  regulatory
program for the Water Quality  and Drinking Water  media  and  for their enforcement
programs.  Specifically,  It provides  staff  at the  Assistant Administrator  and
Office Director levels  to carry  out the following  functions:  development of  a
strategy for Office  of Water  programs  In  the  context of overall Agency  policy;
development of legislative  initiatives, regulations, and  program policies  both
within the Office of  Water  and the Agency; management  direction  and supervision
of organizations performing  functions  assigned to the  AA  and Office  Directors;
development of program plans and budgets to Implement  Agency policies and programs;
administrative management; and analysis  of policy Issues  and monitoring of  program
performance from scientific  and programmatic  perspectives.

PROGRAM MANAGEMENT - PESTICIDES AND TOXIC SUBSTANCES

1981 Accompli sjiments

      In 1981,  resources obligated were $2,132,500 for  Salaries  and  Expenses and
48.2 permanent workyears.  A  new  approach  to managing these programs and  dealing
with affected industries was initiated  In 1981.  Key  features of this  new approach
are top-down direction,  elimination of  those  functions unnecessary for  Implement-
ing pesticides and toxic substances statutes, greater emphasis on sound scientific
judgments In the decision-making process, and closer, more  cooperative  relation-
ships with pesticide manufacturers and  users,  and  chemical  producers.

1982 Explanation of Changes  from January Budget Estimate

                    January           March            Current
                    Estimate         Estimate          Estimate

                  $3,244,900       $3,160,300        $2,691,100

     The net decrease  of -$553,800  results  from several   actions,  as follows:

     "  «Ja " ua ry - Ma r c h .  (-$168,100)   This   change   represented  a  decrease  of
     $168",TOtJ from  fh"?  January  budget  and   reflected a   management overhead
     reduction.

     -  Reorganization.   (+$83,500)  This  shift  of  resources  reflects  the  re-
     organization of enforcement activities allowing  for the shift of environment
     responsibilities along  with  management  functions  assumed  in  this  office.
              _           (-$75,300)   This  Agency-wide  reprogrammi ng  of  -$75,300
     provided resources for transfer of the accountability function to  the Office
     of Management Systems  and Evaluation and, in addition, provides  additional
     resources for the Immediate Office of  the Assistant  Administrator for Solid
     Waste and Emergency Response.   (This reprogrammi ng was  Included In  a letter
     to Congress on December 16, 1981).

     -  Congressional  Actions.  (-$393,900)   An additional reduction of -5393,900
     was applied to the Salaries and  Expenses appropriation to meet Congresslonal-
     ly mandated appropriation levels.

1982 Program                              ,

     The Agency is allocating  $2,691,100  for  Salaries  and Expenses and 46,5 per-
manent workyears in 1982.  Expected accomplishments Include efficiencies  designed
to streamline the pesticide and toxic substances programs, thereby using allocated
resources more efficiently; establishment of  a peer  review system to protect the
scientific and technical quality of publications;  greater use of voluntary agree-
ments as a mechanism  to test  or control  chemicals;  and  the Introduction  of new
policies designed to reduce regulatory burdens while maintaining human and envi-
ronmental protection.
                                     MS-13

-------
1983 Program Request

      The Agency requests $2,693,100 for Salaries and Expenses and 40.0 permanent
work/ears, an Increase of $2,000 and a decrease  of  6.5 permanent  workyears.   The
decrease in workyears  reflects  reduced  requirements for administrative overhead,
consistent with the overall  workyear  reduction in this office.   The  increase  in
dollars provides full  funding  for  the 1983 workyear level.   Highest  priority  in
1983 will be  given to those additional  management  and policy reforms  needed  to
ensure that the pesticides  and toxic  substances programs  devote  their resources
predominately to activities  required  by law  and eliminate backlogs  in programs
that cause delays In the introduction  and controlled use of chemicals,

PROGRAM MANAGEMENT - RESEARCH AND DEVELOPMENT

1981 Accomplishments

      In 1981, resources obligated  were  $3,830,100  for Salaries and Expenses and
77.6 permanent workyears.  These resources provided for the scientific, technical
and administrative management  of  the  Agency's research programs.   These programs
were carried out in Headquarters,  in 14 major  laboratories  and in other field com-
ponents.  In  addition to providing  general  management,  administrative and  budget
support, specific accomplishments included: planning and managing  research  faci-
lities; coordinating interagency and intergovernmental  environmental research and
development; gathering and managing technical  information;  operating the research
committee system to ensure that the ORD's research program  satisfies EPA's  needs;
and providing onsite coordination and  Integration of the centralized program man-
agement functions in Cincinnati, Ohio and Research Triangle Park,  North Carolina.

1982 Explanation of Changes from January BudgetEstimate

                    January          March            Current
                    Estimate         Estiraate         Estimate

                   $3,974,800       $3,818,400       $3,642,800

     The net  decrease  of  -$332,000 results  from  several   actions,  as  follows:

     -  January - March.   (-$156,400)   This  change  represented   a decrease  of
     $156,4uu from  the  January budget,  which resulted from  a  shift  of central
     management functions to program activities and a reduction of administrative
     support in the Cincinnati, Research Triangle Park, and headquarters offices.

     "  Deprogramming.   (+$67,500)  This Agency-wide  reprogramnrlng  of -$42,500
     provided resources for transfer of the accountability  function to the  Office
     of Management  Systems  and Evaluation  and,  In  addition,  provided additional
     resources for the Immediate Office  of  the Assistant Administrator for Solid
     Waste and Emergency Response.  (This  reprogramming was Included in a  letter
     to Congress on December 16, 1981).

        During the  development  of the   operating  plan,  several  miscellaneous
     reprogrammings, which  are not  reportable  to  Congress, were made to  this
     activity and resulted In a net increase of +$110,000.

     -  Congressional Actions.  (-$243,100)  An additional  reduction of -$243,100
     was applied to the Salaries and Expenses  appropriation to meet Congressional-
     ly mandated appropriation levels.

1982 Program

      In 1982, the  Agency  is allocating  $3,642,800  for Salaries and Expenses and
68.5 permanent workyears  to this  subactivlty.  These  resources provide for the
continued activities previously described.
                                      MS-14

-------
1983 Program Request

      The Agency requests $4,011,500 for Salaries and Expenses and 49,2 permanent
workyears.  This  is  an  increase  of 5368,700  and a  decrease  of  19.3  permanent
workyears from  1982.   The  increase in dollars will  be used to  offset increased
operating costs and further  develop  and refine ORD's  information  systems.   With
:a reduced staff, there will  be  a  greater need for reliable,  automated  systems to
perform routine information gathering activities.

PROGRAMI^NAGEH|NT -SOLID WASTE ANDEMERGENCY RESPONSE

1981 Acccmplishments

      In 1981, resources  obligated were $438,200 for Salaries and Expenses and 9.0
permanent workyears.  Major emphasis was placed on establishing the organization,
and instituting  budget  and  accounting  structures  for  the Superfund  program.
1982 Explanati on of Changes from January^ Budget Estimate
                    January
                    Estimate
 March
Estimate
Current
Estimate
                                     $554,700         $850,500

     The net  increase  of  +$850,500 results  from  several  actions, as  follows:

     "  RgPJ'gji"jJ:|tton.   (+$554,700)   A  reorganization  transfer  of  $387,700
     was "made '°W""rI?1ect the shift  of resources  along  with functions  from the
     Office of  Water  to  establish  this  new  office.   A  second  transfer  of
     5167,000 reflects the reorganization of enforcement activities. This allows
     for the  shift  of enforcement  responsibilities  along  with the  management
     functions assumed in this office.

     -  Reprogramming.   (+$296,600)  This  Agency-wide reprogramming of $206,200
     provided resources for transfer of the accountability function to  the Office
     of Management  Systems  and Evaluation and. In  addition,  provided  additional
     resources for the Immediate  Office  of the  Assistant Administrator for Solid
     Waste and Emergency  Response.   (This  reprogramirring  was included in a letter
     to Congress on December 16, 1981).

        During the development of the operating  plan,  several miscellaneous repro-
     grammings, which  are  not  reportable to  Congress, were made to this activity
     and resulted in a net increase of +$90,400.
                      Actions.   (-$800)   An  additional  reduction  of -$800  was
     appl 1 ed to  the  Sal art es and Expenses appropriation to  meet Congressionally
     mandated appropriation levels.

1982 Program

      In 1982, the  Agency is  allocating  5850,500 for Salaries  and Expenses  and
10.3 permanent workyears for this component.  Emphasis 1s being placed on provid-
ing policy  overview  and  resource coordination for the Agency's major programs on
hazardous waste.  Specifically, efforts are focused on developing accounting con-
trols and documentation  for  use of Superfund resources  and  coordinating the  de-
velopment and revision  of regulations to support  the Resources  Conservation  and
Recovery Act.

1983 P rogram Request "

      The Agency  requests  $463,400 for Salaries and Expenses and  6.6 permanent
workyears.  This  decrease  of 5387,100 and 3.7 permanent workyears  from  1982  re-
sults from  the  implementation of  management efficiencies in  the  AA's Immediate
Office.  The  requested  resources will  provide  for the  continued  overall  direc-
tion and  support needed  to  conduct  these  national  hazardous  waste  programs.
                                      MS-15

-------
                              MANAGEMENT AND SUPPORT

                                Agency Management
Budget Request
     the Agency  requests  a  total  of $82,372,600  of  Salaries and Expenses  funds
and 1,400.2 permanent  workyears for  Agency  Management  fn  1983,  a  decrease  of
S3,029,100 and 113.8 permanent workyears from 1982.

Program Description

     Agency Management provides for  Agency-wide policy direction  and  management
and administrative activities.  It  Includes the salaries  and associated costs  for
the Executive Offices, including the Immediate Office of  the Administrator/Deputy
Administrator, the staff  offices which  report directly to  the  Administrator,  and
the Office of the Inspector  General; the Office of Policy  and Resource Management;
the Immediate  Office  of  the  Associate Administrator for  Legal  and Enforcement
Counsel and the  Offices   of the General  Counsel  and  Regional  Counsels; and  the
Office of Administration.
                                      MS-16

-------
Page Intentionally Blank

-------
  Agency
Management
    SECTION TAB

-------
Page Intentionally Blank

-------
                                          MANAGEMENT «  SUPPORT

                                           Agency  Management
                             Office  of  the Administrator/Executive  Offices

                                     ACTUAL     JANUARY     MARCH     CURRENT    ESTIMATE INCREASE +
                                       1981     ESTIMATE    ESTIMATE  ESTIMATE    1983    DECREASE -
                                                  1982        1982        1982             1983 VS 1982

                                               (DOLLARS IN THOUSANDS)
 PROGRAM
 Immediate Office  of
 the  Administrator
  Salaries 8  Expenses

 Regulatory
 Information  Service
 Center
  Salaries S  Expenses

.Administrator's
 Representation Fund
  Salaries 8  Expenses

 Science  Advisory
 Board
  Salaries S  Expenses

 Office of
 Congressional  Liaison
  Salaries S  Expenses

 Office of
 International
 Activities
  Salaries 8  Expenses
$2,099.0   $2,155.5   $2,651,7   $2,041.8   $2,276,7    $234.9
                                   $900.0     $550.0   -$350.0
     $.6       $3.0       $3.0       $3.0       $3.0
  $710.8   $1,113.4   $1,060,5     $921.3   $1,088.7    $167.4
  $718.0
$811.1     $729.7     $959.5    $229.8
$1,159.3   $1,262.1   $1,363.2   $1,145.1   $1,028.3   -$116.8

-------
                                         MANAGEMENT * SUPPORT
Office of Civil
Rights
 Salaries & Expenses

Federal Women's
Program
 Salaries & Expenses

Civil Rights
Investigations
 Salaries S Expenses

Office of Public
Affairs
 Salaries 4 Expenses

Office of Press
Services
 Salaries & Expenses

Office of Public
Awareness
 Salaries & Expenses

Office of Federal
Activities
 Salaries S Expenses
                                          Agency Management
                            Office of the Administrator/Executive Offices

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       198Z       1982            1983 VS 1982

                                              (DOLLARS IN THOUSANDS)
$1,121,2   $1,288.8   $1,271.5   $1,127.9   $1,008.1   -$119.8
    $8.4      $10.0      $10.0       $9.2      $10.7      $1.5
  $118.4     $156.5     $146.5      $90.1     $154.3     $64.2
$2,798.5
$949.9   $1,147.6   $1,421.1    $273.5
             $824.9
           $2,878.4
$1,482.5   $1,439.0   $1,579.0   $1,556.7   $1,189.1    -$367.6

-------
                                         MANAGEMENT * SUPPORT
                                          Agency Management
                            Office of the Administrator/Executive Offices

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
Office of
Administrative Law
Judges
 Salaries 4 Expenses

Office of Regional
Liaison
 Salaries S Expenses

Office of
Intergovernmental
Liaison
 Salaries 4 Expenses

Office of Small &
01sadvantaged
Business Utilization
 Salaries 4 Expenses

Office of Inspector
General
 Salaries & Expenses

TOTAL:
 Salaries 4 Expenses

Office of the Administrator/
Executive Offices      TOTAL
                                              (DOLLARS IN THOUSANDS)
   $567.9     $962,5   $1,013.5     $528.2     $626.9     $98.7
    $97,5     $166.0     $148.6     $118.6     $109.5     -$9.1
   $320.7     $339.6     $332.3     $265.3     $352.7     $87.4
   $155.5     $204.0     $209.5     $200.5     $162.5    -$38.0
$10,128.6  $11,940.6  $11,751,8  $11,472.6  $11,564.2     $91.6
$21,486.9  $24,744.3  $23,302.1  $22,257.6  $22,505.3    $323.7
$21,486.9  $24,744.3  $23,302.1  $22,Z57.6  $22,505.3    $323.7

-------
                                         MANAGEMENT 8 SUPPORT

                                          Agency Management
                            Office of the administrator/Executive Offices

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE 4-
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PERMANENT FULL-TIME WORKYEARS


Immediate Office of the
Administrator                          39.2       45.6       50.6       40,9       48.6       7.7


Regulatory                                                               7.0        5.0      -2.0
Information Service
Center

Science Advisory                       11.3       15.4       15.4       11.7       16.1       4,4
Board

Office of                              17.0                  17.3       16.6       23.4       6.8
Congressional Liaison

Office of                              21.3       21.8       18.6       17.7       15.0      -2,7
International
Activities

Office of Civil                        23.6       26.5       24.5       21.5       16.6      -4.9
Rights

Office of Public                       46.5                  16.0       20.0       18,9      -1,1
Affairs

Office of Press                                   12.2
Services

-------
                                           MANAGEMENT & SUPPORT

                                          Agency Management
                            Office of the Administrator/Executive Offices

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
Office of Public
Awareness

Office of Federal
Activities

Office of
Administrative Law
Judges

Office of Regional
Liaison

Office of
Intergovernmental
Liaison

Office of Small *
01sadvantaged
Business Utilization

Office of Inspector
General
 35.3
 14,7
  3.3
  3.6
  2.9
            31.8
33.8
25,9
 3.0
 3.0
 5.0
32.8
25.9
 2.0
 2.0
 4.0
32.0
15.0
 2.0
 3.0
 3.7
24.2      -7.8
15.0
 1.5       -.5
 4.9       1.9
 3.1       -.6
122.0      143.0      140.0      146.2
                                140.7
                                -5.5
TOTAL PERMANENT WORKYEARS
340.7      367.0      349.1      337.3      333.0      -4.3

-------
             MANAGEMENT « SUPPORT

              Agency Management
Office of the Administrator/Executive Offices

TOTAL WORKYEARS
Immediate Office of
the Administrator
Regulatory
Information Service
Center
Science Advisory
Board
Office of
Congressional Liaison
Office of
International
Activities
Office of Civil
Rights
Office of Public
Affairs
Office of Press
Services
ACTUAL JANUAflY MARCH CURRENT ESTIMATE INCREASE +
1981 ESTIMATE ESTIMATE ESTIMATE 1983 DECREASE -
1982 1982 1982 1983 VS 1982

53.4 51.5 61.5 49.8 59.3 9.5
9.0 5.0 -4.0
17.3 24.2 26.2 22.5 25.9 3.4
24.7 23.8 23.1 31.0 7.9
29.6 26.9 25.2 27.3 23.0 -4.3
31.6 35.7 34.7 30.2 23.8 -6.4
64.5 24.9 25.0 24.3 -.7
17.1

-------
                                         MANAGEMENT S SUPPORT

                                          Agency Management
                            Office of the Administrator/Executive Offices

                                     ACTUAL    JANUARY     HARCH     CURRENT   "ESTIMATE I CREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
Office of Public
Awareness

Office of Federal
Activities

Office of
Administrative Law
Judges

Office of Regional
Liaison

Office of
Intergovernmental
Liaison

Office of Small 4
Disadvantaged
Business Utilization

Office of Inspector
General
 40,7
 15.1
  3.5
  6.7
  3.9
141.7
            52.3
 38.8
 27.8
  6.6
  5.9
40.8
27.8
             3.0
 5.6
 4.9
40.0
15.3
            3.0
 5.6
 4.6
30.3      -9,7
15.6
            2.6
 7.1
 3.9
173.0      170.0      173.6      170.7
 .3
           -.4
1.5
-.7
                                -2.9
TOTAL HORKYEARS
432.7      463.8      448.4      429.0      422.5      -6.5

-------
                             MANAGEMENT AND SUPPORT

                               Agency Management

                 Office of the Administrator/Executive Offices

Budget Request

     The Agency  requests  a total  of $22,505,300 for  Salaries  and Expenses  and
333.0 permanent workyears  for  the  Office of the Administrator In  1983.   This  Is
an Increase  of $247,700 and  a decrease  of 4.3 permanent  workyears from  1982.
The resources  will  support stronger executive management  1n  the form of firmer
policy guidance,  more  effective   relations  with  Congress,  and  better  quality
scientific advice for the entire Agency.

Program Descrlpti on

     These resources Include the salaries  and associated  costs  for the  Immediate
Office of  the Administrator,  the  staff  offices which  report  directly  to  the
Administrator, and the  Office  of the  Inspector  General.   The Administrator  and
Deputy Administrator are  responsible for  providing  policy and direction  to  the
Agency and ensuring  implementation  of their policies; the  staff  offices  perform
a variety of  functions  which  are closely related to  developing  and implementing
these policies and programs.

     ImmediateOffice of theAdministrator -- This  office includes:  the  Admini-
strator and Deputy Administrator,  specTa'T  assistants  to the Administrator 1n  the
various program areas,  speech  writers, clerical  support staff, drivers  and mes-
sengers; the Agency's focal point  for  answering  Freedom of Information  requests;
the Executive  Communications Office,  which is responsible for tracking  all cor-
respondence coming In or  going out of the Administrator's  Office;  and the  staff
responsible for  centralized budget  preparation, funds  control,  administrative
services and resource analysis for the Executive Offices.

     RegulatoryInformationServiceCenter — The Center  is  responsible  for tab*
ulating and cOmpiIing  ihforiiiatlon  provided by other  Federal  agencies concerning
their regulatory efforts.

     Administrator's Representation Fund — The Fund  Is used  for  official  recep*-
tions, meetings, and affairs hosted  primarily by the  Administrator for  domestic
and foreign officials.

     Science Advisory Board —  The Board  consists  of  a   Director,  professional
and clericalstaff,  and  approximately 50  Independent  scientists  and  engineers
who advise the Administrator on the scientific and technical bases of the Agency's
decisions.  They review the scientific  basis of regulatory  proposals, the  adequacy
of Agency  research and  the research  planning process,  the  five-year research  and
development plan, as well  as special  requests from the Administrator, the Deputy
Administrator and the Congress.  The SAB prepares findings and recommendations in
technical reports which are legally  required to  be  sent directly to the  Adminis-
trator and to the Congress.

     Office of CongressionalLiaison —  This  office  serves  as  the  principal
point~of  Congressional  contact  For  the'Agency.   It  provides  summaries   of
Congressional activities   throughout  EPA  and  assists  the  Administrator,  the
Office of  Legislation  and senior  policy officials in  developing plans  for  the
Agency's legislative  program.   In addition,  It reviews  all  Congressional cor-
respondence,  responds  to  Congressional  requests  for  information  and   coordi-
nates grant and contract announcements.

     Office of International Activities —  This  office  provides  guidance  and
uianagment for  the  Agency's  international  activities and  programs with  Western
European countries,  Japan,  and  the  Agency's  Scientific  Activities   Overseas
                                     MS-24

-------
(SAO) Program.   In  addition,  the  office  manages  agreements  with  Canada  and
Mexico on  cross-boundary  environmental  Issues  'and oversees  Agency  involvement
in the  activities  of  international  organizations  such  as  the  United  Nations
Environmental Program,  the  World  Health Organization,  and  the Organization  for
Economic Cooperation  and  Development  (OECD).    Finally,   the  office  plays  a
strong role  in  formulating  and  implementing Agency  policies that  affect  the
international marine environment.

     Office of Civil  Rights -- This  office  manages  the  Agency's  civil  rights
programs!  TE  provides  policy  guidance  to  the  Administrator  and  evaluates
activities required to carry  out the  Agency's  responsibilities to assure  equal
opportunity and  prohibit  discrimination  in  employment  at  EPA.   This  program
element also  supports   the  area  Civil   Rights  Directors,  who  represent  the
Director regarding all  aspects of  civil  rights and equal  opportunity  programs,
at major  research  and  satellite  installations  in Cincinnati,  Research  Triangle
Park and Las Vegas.

     Federal Women ' s Program — This  program  element  supports  the  activities
of the Headquarters Federal  Women's Program Committee which  is the  headquarters
component of the Agency's Federal Women's Program.  Activities  sponsored by this
program throughout the  year  cover   seminar  and  workshop  costs and  other  non-
personnel costs  related   to  Improving  the   status   of  women  employed  at  EPA
headquarters.

     Civil Rights Investigations  -- This program  element provides  contract  funds
for processing complaints of discrimination on the basis of race, color,  religion,
sex, age or national  origin lodged by Agency employees and applicants  for employ-
ment.  These  funds are  used  for Investigations,  adjudications,  hearings,  and
Equal Employment Opportunity  Counselor  training,  as   well  as  awarding  attorney
fees when the complainant prevails.

     Office of Public Affairs --   This  office  develops Agency  policy for  media
rel at1 ons and  public  information.    Its activities  Include:   preparing  press
releases and  feature  material  for  media  distribution;   responding  to  press
Inquiries; conducting press conferences and briefings; coordinating media appear-
ances of  key Agency officials;  and  compiling  dally   and  weekly  news  clips  of
national press  coverage.   In  addition,  under  the  EPA Peer  and  Administrative
Review Control  System, the office  reviews  all  public information materials  for
conformance to policy and the Agency's Graphics Standards  System.
               _                   — This  office develops national policies  for
deal 1 ng Irflth ^rivTrinlietffial issues and  problems associated  with  Federal  agencies.
Specifically, the Office  of Federal  Activities is responsible  for  ensuring  that
EPA and other Federal  agencies  carry out their activities  in  an  environmentally
sound manner pursuant to the Kational Environmental  Policy Act and Section 309 of
the Clean Air  Act.   In  this  capacity,  OFA  files and  publishes  notices of  all
Environmental Impact Statements.  Additionally, in concert with the Army Corps of
Engineers, OFA manages the Dredge and Fill  program under Section 404 of the Clean
Water Act.  OFA also oversees Federal  facility compliance with environmental  re-
quirements, and specifically with Executive Order 12088.

     Office of Administrative Law Judges — Judges from  this  office preside  over
and conduct hearings  required  by  'we Administrative  Procedures  Act  related  to
appeals of Agency regulations and decisions.

     Of f 1 ce of Regional Li ai son ~ This office serves  as  a Headquarters point of
contact for Regional  offices.   It handles  specific  Headquarters/Regional  policy
issues, assures  Regional  involvement  in the  development  of  Agency policy  and
regulations through the  steering committee process, and  reviews  and coordinates
EPA comments on Air State Implementation Plans (SIPs).
                                     MS-25

-------
     Office of Intergovernmental  Liaison -- This  office serves  as the  Agency's
principal point of contact with  major  national  public interest groups and  State
and local  governments.   It  also  serves to emphasize  the Administrator's  concern
with developing cooperation  and  support for  delegating  more responsibility  for
Agency programs to State and local governments.  To these  ends, it assists  State
and local  officials with  their requests for information,  arranges meetings  with
them, and  encourages  State and  local  involvement in  EPA's regulatory  process.

     Office of Small  and Disadvantage^ Business  Utilization —  This  office  pro-
vides Agency-wide oversight in Implementing programs  under Sections  8 and  15  of
the Small Business Act (as amended) to  further the utilization  of  EPA  procurement
and financial  assistance  programs by   small  and  disadvantaged  businesses.   It
develops national  policy  for EPA  and  serves as  the  focal  point for providing
guidance for implementing the Agency-wide minority and women's business enterprise
policy under grants  and cooperative agreements.

     Office of Inspector General  — This office, the largest single component  of
the Office of the Administrator,  is responsible  for:   conducting,  supervising and
coordinating audits  and investigations  relating to EPA programs  and  operations;
promoting economy and effectiveness  in  the administration  of EPA programs;  pre-
venting and detecting fraud and abuse in EPA programs and operations;  keeping the
Administrator and  Congress  fully  Informed  about  problem  areas  and   related
corrective action; and reviewing EPA regulations and legislation.
                                     MS-26

-------
IMMEDIATE OFFICE OF THE ADMINISTRATOR

1981 Accomplishments

     In 1981, this office  obligated $2,099,000  and  39.2 permanent workyears, all
of which was  for the Salaries and Expenses  appropriation.   The Administration's
first major effort was  to  assess the Agency's organizational  strengths  and  weak-
nesses in order  to  develop improved and more efficient ways of  doing  business.
This review led to an Agency-wide reorganization in  the  summer of 1981 which, most
notably, created the  Office  of Policy  and Resource Management  and the  Office of
Legal and  Enforcement  Counsel.   In  addition,  the Administrator  reviewed  the
organization of  her  immediate office.   Changes resulting  from this study  will
be implemented in 1982.

1982 Explanation of Changes from January Budget Estimate

                   January             March            Current
                  Estimate            Estimate         Estimate

                 $2,155,500          $2,651,700       $2,041,800

     The net  decrease of  -$113,700  results  from  several  actions,  as  follows:

                           (+$496 ,200)   This  change represented  an  increase  of
               ,
     $496,200 from the January budget.

     "  Reprpgramming.   (-$508,400)   Resources  totaling  $348,200  were  trans-
     f erred to  the  newly  established  Regulatory  Information  Service  Center
     program element.   Additionally* during  the  development  of  the  operating
     plan, several  miscellaneous  reprogrammings,  which  are  not  reportable  to
     Congress, were  made to  this  activity and  resulted  In  a  net decrease  of
     -$160,200.

     -  Congressional Actions.  (-$101,500)  A reduction of -$101,500 was applied
     to the sal arles  and Expenses  appropriation  to meet Congressional ly mandated
     appropriation levels.

1982 Program

     In 1982,  the Agency is allocating  a total  of $2,041,800 and  40.9 permanent
workyears to this office,  all of which  is for the Salaries  and Expenses  appro-
priation. In  conjunction with its overall  objective  of  centralizing  funds con-
trol, the Agency  is  moving to consolidate the  staff  offices.  This  change will
also give  the Administrator  improved flexibility to  meet   changing  priorities
within the staff offices.  A feasibility study has been conducted and work  almost
completed on  developing an  automated correspondence  tracking system.   Several
reorganizations are  being  undertaken  to  develop  more  efficient  and  effective
methods of carrying out essential  staff office functions.

1983 Program Request

     The Agency requests  a total  of $2,276,700 and 48.6  permanent workyears for
this program,  all of which Is for the Salaries and Expenses appropriation.  This
is an increase of $234,900 and 7.7 penmanerit workyears, which reflects an organi-
zational change centralizing  the  positions and  resources associated  with  funds
control in each of the staff  offices into this office.

P.EGULATORY INFORMATION SERVICE CENTER

1981 Accomplishments

     In 1981,  the Center obligated $2,384,000  and 10.0 permanent workyears,  all of
which was from the U.S.  Regulatory Council appropriation.  The Center (then known
                                     MS-2 7

-------
as the U.S. Regulatory Council) published two editions of the Calendar of Federal
Regulations and  an  index to  the  Calendar.   In  addition,  it conducted  in-house
studies on the effect of federal regulations in the areas of:  Health and Safety,
Human Resources,  Natural  Resources,  Trade  and  Commerce, and Transportation  and
Communications. Finally,  the  Center developed  a  series  of  six  handbooks  on
alternatives to regulation.
1982 Explanation of Changes from January Budget Estimate
                   January
                  Estimate
 March
Estimate
 Current
Estimate
                                                       $900,000

     The net  increase of  +$900,000  results  from  several  actions, as  follows:

     -  Reprogramniing.   (+348,200)   These  resources  are  transferred  from  the
     Office of  Administrator  and  Deputy  Administrator  to  establish  this  new
     office.

     -  Transfer Authority.   (+$551,800)  These resources  were  transferred  from
     Mul ti -media Energy  tnvi ronmental  Engineering and  Technology  to fully  fund
     the operating  expenses  for  the  Regulatory  Information  Service  Center.

1982 Program

     In 1982, the Agency is allocating a total of  $900,000 and 7.0 permanent work-
years to this office, all of which  is  for the Salaries and Expenses appropriation.
The office will publish  one edition of the  Calendar and is  working on developing
an automated system  to  produce a data base of  information  on regulatory  agenda.
It is also designing an analysis of Federal  Register statistics.
     The Agency requests a total of $550,000 and 5.0 permament workyears for this
program, all of which  is for the Salaries and Expenses appropriation.  This is a
decrease of $350,000  and a decrease  of  2.0 permanent workyears.   The  resources
will provide for  contract funds to  refine the automated data base.  The  Center
will continue Its monthly analysis of Federal Register statistics.

ADMINISTRATOR'S REPRESENTATION FUND

1981 Accomplishments

     In 1981, this program element obligated $600  from the  Salaries and Expenses
appropriation.
1982 Explanation of Changes from January Budget Estimate
                   January
                  Estimate
 March
Estimate
 Current
Estimate

  $3,000
                    $3,000              $3,000

     There was no change to this activity.

1982 Program

     In 1982, the Agency  is  allocating  a  total  of $3,000 for this function under
the Salaries and Expenses appropriation.
                                     MS-28

-------
1983 Program Request

     The Agency  requests  a  total  of $3,000  in  1983  for the Salaries and Expenses
appropriation.  This is the same as the 1982 level.

SCIENCE ADVISORY BOARD

1981 A_cc.onipl i shments

     In 1981, the  Science Advisory  Board  obligated $710,800 and  11.3  permanent
workyears, all  of  which  is  for  the Salaries  and  Expenses appropriation.   The
Board provided  advice  on the  scientific  and technical aspects  of environmental
problems and  Issues  as requested  by the  Administrator and as  mandated by  the
Congress.  For  example,   1t  reviewed the  Agency's  F1ve-Year  Research  Plan,  an
Assessment of Health Risks  Associated  with Primary national Ambient  Air Quality
Standards, and a Technical Support Document for Regulatory Action Against Friable
Asbestos Containing Materials in School  Buildings.

1982 Explanationof Changes from January Budget Estimate

                   January             March            Current
                  Estimate            Estimate         Estimate

                $1,113,400          $1,060,500         $921,300

     The net  4ecrease  of  -$192,100 results  from  several  actions,  as  follows:

     -  January - March.   (-$52,900)   This change represented  a  decrease  of
     $52,900 from the January budget.

     -  Reprogramming.  (-$15,600)  During the development of the operating plan,
     several miscellaneous reprogrammings,  which  are not  reportable to  Congress,
     were made  to  this  activity  and resulted 1n  a   net  decrease of  -$15,600.

     "  Congressional Actions.  (-$123,600)  A reduction of -$123,600 was applied
     to the Salaries and  Expenses  appropriation to  meet Congressionally mandated
     appropriation levels.

1982 Program

     In 1982, the Agency  is allocating a total of $921,300 and 11.7 permanent work-
years to the  Science Advisory  Board (SAB),  all of which is  for  the Salaries and
Expenses appropriation.   In  addition to the Board's strengthened  advisory  role,
its staff will,  at the  request of the  Administrator or the Deputy  Administrator,
participate in  the peer  review of scientific  documents written  within  or funded
by the  Agency  for  distribution outside  of EPA.  Scientific  Issues or  papers
which the  SAB  is  reviewing  in 1982 include, among  others,  Radioactive  Waste
Disposal Standards, Exposure  Assessment Guidelines, and an  Integrated  Acid  Rain
Document.

1983 Program Request

     The Agency  requests  a  total  of $1,088,700 and 16.1 permanent workyears for
this program, all of  which  is  for the  Salaries and Expenses appropriation.   The
increase of $167,400 and  4.4 permanent workyears will   be  used  to  strengthen the
Board in light  of its increased responsibilities  and to expand the  number  of SAB
meetings held.   In 1983,  the Deputy  Administrator will Identify 15-25 additional
regulatory issues for SAB review.
                                     MS-29

-------
OFFICE OF CONGRESSIONAL LIAISON

1981Accomplishments

     In 1981, this office obligated $718,000 and 17.0 permanent workyears,  all  of
which Is for the Salaries  and  Expenses appropriation.  The Office of Congressional
Liaison (OCL)  was split  from the  Office of  Legislation,  and  the former  made
responsible for day-to-day contact with  Congress.

1982 Explanation of Changes from January Budget Estimate

                  January             March            Current
                  Estimate            Estimate          Estimate

                                      $811,100          $729,700

     The net  Increase of  +$729,700 results  from several  actions, as  follows:

     *  Rep'"ganl2at1on.   (+$811,100)  The Office  of Legislation was  dismantled
     and its resources split between two newly established Offices of Legislation
     and Congressional Liaison.

     "  Reprogramming.  (-$13,300)  During the development of the operating plan,
     several miscellaneous reprogramnings, which are  not  reportable to Congress,
     were made  to this activity  and resulted in a net  decrease  of  -$13,300.

     -  Congressional Actions.  (-$68,100)  The Congressional  earmarked reduction
     to the  Office  of Legislation was  a  total of $130,000 and  -$68,100  applied
     to this program in the Salaries and Expenses appropriation.

1982 Program

     In 1982 the Agency Is allocating a  total of $729,700 and 16.6 permanent work-
years to this office.  This office has been reorganized to improve Its operations.
It is  actively  involved In the entire  legislative program of the  Agency,  while
devoting special attention to  reauthorizatlon  of the  Clean  Air,  Clean  Water, and
Safe Drinking Water Acts.

1983 Program Request

     The Agency  requests  a total  of  $959,500 and 23.4 permanent  workyears for
this program.   This  is an increase of  $229,800  and  6,8 permanent  workyears and
represents the  heightened emphasis  the  Administrator  places  on  this  office's
responsibilities.

OFFICE OFINTERNATIONALACTIVITES

1981 Accomplishments

     In 1981, this office  obligated $1,159,300 and 21.3 permanent workyears, all
of which was  for the Salaries and Expenses  appropriation.   Relations  with  Canada
were the primary concern  of  the  Office of International Activities  (OIA).   Our
two governments opened negotiations on an air quality agreement and established a
bilateral framework  for  assessing transbo^undary problems.  Utilizing  joint  work
groups, this  structure represents  a  major  International   effort to define  and
resolve such problems through  cooperative technical  analyses  In  conjunction  with
formal diplomatic negotiations.

     EPA's efforts in International organizations  also showed significant results.
For example, under the auspices of the  Organization  for Economic Cooperation and
Development's (OECD)  Chemicals and  Environment Program,  the  United  States and
other member countries agreed to  a common approach for  dealing with data  related
to toxic substances control known as the Mutual Acceptance of Data in the Assess-
                                     HS-30

-------
ment of Chemicals. The OECD Chemicals Program was reauthorized until  1984.   Like-
wise, in  1981,  OIA aided  the  effort to establish and implement hazardous  waste
export notification  procedures as  required  by  regulations  under the  Resource
Conservation and Recovery Act (RCRA).

1982 Explanation j»f Changes from Janjjar'y Budget Estimate

                   January             March            Current
                  Estimate            Estimate         Estimate

                 $1,262,100          $1,363,200      $1,145,100

     The net decrease  of  -$117,000  results  from several  actions,  as  follows:

     -  January - March.   (•••$101,100)   This  change  represented an  Increase  of
     $101,100 from the January budget.

     "  Regrogrammlrig.  (+2,900)  During  the  development of the operating  plan,
     severaTMsSelTaneous reprogrammings, which are not reportable  to  Congress,
     were made  to this  activity and  resulted  in  a  net increase  of  +$2,900.

     -  Congressional Actions.   (-$221,000)  A reduction of -$221,000 was applied
     to the Salaries and  Expenses  appropriation  to meet Congressionally mandated
     appropriation levels.

1982 Program

     In 1982, the  Agency  is  allocating $1,145,100 and 17.7 permanent  workyears,
all of  which  Is  for the  Salaries  and Expenses  appropriation.   Foreign  travel
will be more tightly restricted  In  response to directives from the Administrator
and the President.   Negotiations with  Canada are again  uppermost,  particularly
in pursuit of a transboundary air quality agreement.    EPA also plans to finalize
joint agreements  with  Canada  on phosphorus  loadings  in the  Great  Lakes  Basin
and on  the  abatement and  control  of  discharges  Into the  Niagara and  St.  John
rivers.  OIA is  also  involved  in  negotiations   and  joint ventures  on various
Issues with Mexico and the European countries.

     Amendments to and clarifications  of  existing hazardous waste  export regula-
tions are being made to further streamline the notification procedures for  United
States waste generators who propose to export hazardous waste.   Similarly,  recom-
mendations are being  developed and  implemented  to  improve foreign  notification
on pesticide exports as required by FIFRA.

1983 Program Request

     The Agency requests  a total  of $1,028,300 and 15.0  permanent workyears for
this office, all  of  which is for the  Salaries and Expenses  appropriation.   This
is a  reduction  of $116,800  and  2.7 permanent workyears, which Is  commensurate
with reductions in Agency  resource levels and otherwise  reflects reduced foreign
travel.  Negotiations with Canada on transboundary air pollution and  water  issues
will continue.   EPA  will  be heavily  involved In high  level  OECD  meetings  on
chemicals and environmental  economics.  Bilateral  activities  will  concentrate  on
Implementing existing agreements.

OFFICE OF CIVIL RIGHTS

]981 JUxomplisnments

     In 1981, this office  obligated  $1,121,200 and 23.6  permanent  workyears, all
of which  was for  the Salaries and  Expenses  appropriation.   The Office  of  Civil
Rights (OCR) reviewed  the Equal  Opportunity Program  at EPA's  Cincinnati,  Ohio
Laboratory. OCR's  Equal   Employment  Opportunity   (EEO)  Program Activities  Staff
developed the first Agency-wide multi-year Affirmative Action Plan.
                                     MS-31

-------
     The External Compliance Staff published as a proposed  rule,  a  comprehensive
regulation consolidating the requirements  of Title VI  of the 1964 Civil  Rights
Act, Section XIII of the 1972 Federal  Water Pollution  Control  Act Amendments,  the
Age Discrimination Act of  1973,  and  Section 504 of the 1973  Rehabilitation Act.
The staff  reached final  settlement  with  134  contractors on  complaints  filed
pursuant to the Davis-Bacon Act and the Ualsh-Healy  Act.

     The Discrimination Complaints Staff resolved,  through settlement,  a total  of
ten complaints compared  to two  complaints  the previous year.   It prepared  and
distributed 12 final  Agency decisions  and eight proposed dispositions.   The staff
conducted a nationwide survey of EPA  Counselors and  Regional Directors  to analyze
this caseload  in  terms of  quantity  and the Issues  involved  fn  the  complaints.

1982 Explanation of Changes frpin January Budget Estimate

                  January              March           Current
                  Estimate            Estimate          Estimate

                $1.288,800          $1,271,500        $1,127,900

     The net  decrease  of  -$160,900  results from  several  actions,  as  follows:

     -  January - March.   (-$17,300)   This  change  represented  a decrease   of
     $17,3UU from tne January budget.

     -  Reprogramming.  (-322,300)  During the  development of  the operating plan,
     several miscellaneous reprograronings, which are not  reportable to Congress,
     were made to  this  activity  and  resulted In  a  net  decrease  of  -522,300.

     -  CongressionalActions.   (-$121,300)  A  reduction of -$121,300  was applied
     to the Salaries and  Expenses appropriation to  meet Congresslonally mandated
     appropriation levels.

1982 Program

     The Agency 1s allocating  a  total  of $1,127,900 and  21.5  permanent workyears
for this program,  all  of which  1s  for Salaries and Expenses appropriation.  The
Office of Civil Rights  is:   continuing  EEO Program reviews of the Regional offices
and the  remaining laboratories;  providing  support to  EPA  program  offices  in
developing the Agency's plan  for  support to  Historically  Black  Colleges  and
Universities; developing  an Agency-wide  Multi-Year Affirmative  Action Plan  in
accordance with Equal Employment Opportunity Commission requirements; and monitor-
ing the Agency's compliance with Affirmative Action  goals.

     OCR's External  Compliance Staff  will  complete  negotiations  with  the Depart-
ment of Justice  and  publish,  as a final rule,  the  comprehensive  regulation pro-
posed in 1982.  The  staff  will  settle a  number of  complaints  of labor law viola-
tions filed against  Agency  contractors as well as  resolve  the  backlog  of  cases
from 1981 which require debarment or other sanctions.

     OCR's Discrimination Complaints Staff will continue to concentrate on clear-
ing the  complaints  backlog and  will   encourage  settlement of complaints  during
the informal counseling stage.

1983 Program Request

     The Agency  requests  a total of $1,008,100 and 16.6  permanent  workyears  for
this program,  all  of which is  for the Salaries and Expenses appropriation.  This
reduction of $119,800 and 4.9 permanent workyears is commensurate with reductions
in Agency  resource  levels-   The office  will   continue  to manage  the  Agency's
civil rights  programs  as  mandated by  law.  Efforts will  continue to  be made to
keep the  internal  and  external   complaints  process up to  date.   Any  remaining
backlogs will  be eliminated.
                                     MS-32

-------
FEDERAL WOMEN'S PROGRAM

1981 Accomplishments

     In 1981, this unit  obligated $8,400,  all  of which was for the Salaries  and
Expenses appropriation.  The Headquarters Federal  Women's  Program  (FWP)  sponsored
seminars and meetings throughout 1981 about employment Issues and  other concerns
of interest to all  employees.   A bi-monthly  newsletter was  also published.

1982 Explanation of Chaojj^J^
-------
1983 Program Request

     The Agency requests a  total  of $154,300 for  this  program,  all  of which  is
for the Salaries  and Expenses  appropriation.   The increase  of  $64,200 will  be
used to contract  for additional  investigators and adjudicators  to eliminate any
remaining backlog of unresolved discrimination complaints.

OFFICE OF PUBLIC AFFAIRS

11981 Accornpl 1 shments

     In 1981, this  office  recieved $2,798,500 and 46.5 permanent workyears, all
of which  was  for the  Salaries  and  Expenses  appropriation.   As  part  of  the
Administrator's Agency-wide  reorganization,  the  Offices  of  Press  Services  and
Public Awareness  were  combined  to  form the  Office  of Public Affairs  (OPA),
effective July  1,  1981.  During the  remainder  of the year,  in  addition to its
primary responsibility for  dealing with the press, OPA reviewed public  Information
publications, grants and contracts,  monitored the  moratorium  on  printing,  under-
took review  of  the  Agency's public  participation policy,  and  transferred the
President's Environmental  Youth Awards Program to  the Regions  for more efficient
handling at the local level.

Ij^Sg^lxplanatlon of Changes from January  Budget Estimate

                  January               March           Current
                  Estimate            Estimate        Estimate

                                      $949,900       $1,147,600

     The net Increase  of  +$1,147,600 results  from several  actions, as  follows:

     "  Reorganization.  {+$949,900)  This reorganization consolidated the  Office
     of Press Services and  the Office  of Public  Awareness  to  create the  new
     Office of Public Information.

     "  Reprogramming.  (+$291,700)  During the development of the operating plan,
     several miscellaneous  reprogrammings, which are not reportable to Congress,
     were made  to  this activity  and resulted  in  a net Increase  of  +$291,700.

     -  CongressionalActions.  (-$94,000) The Congressional  earmarked reduction
     to this ac11vity -594,dOO was applied to the Salaries  and Expenses appropri-
     ation in final action  on pur 1982 Appropriation Bill.

1982 Program

     The Agency is allocating a total of  $1,147,600 and  20.0 permanent workyears,
all of which is  for the Salaries and Expenses appropriation.   In addition  to its
regular duties,  OPA is:   implementing the  new peer and  administrative  review
control system  on public   information  materials;  rewriting  the  Agency's  public
participation policy;  publishing  the EPA Journal  but with  more restricted dis-
tribution; running  the Speakers  Bureau;  develdping  community  relations  policy
guidance for the  Superfund  program;  acting   as  a liaison  with  the  President's
Council on  Consumer Affairs; overseeing  Regional  handling of the  Youth  Awards
Program; and developing a  new  publication  on  Agency  functions  and  programs.

1983 P rogram Request

     The Agency is allocating a total of  $1,421,100 and  18.9 permanent workyears,
this office, all  of  which  is for the Salaries  and Expenses  appropriation.   This
is an increase of $273,500 and a decrease  of 1.1 permanent workyears.   The Increase
will be used to offset Increased  printing  costs  for the  EPA Journal and  other
publications.  OPA will continue its current activities  1n T9T53.
                                     MS-34

-------
1982i_Program

      The Agency is allocating 52,875,100 for Salaries and Expenses and 75.2 per-
manent workyears.   This program  element  supports  Regional  program  priorities
through legal advice  and assistance,  legal  defense  of Agency decisions, and par-
ticipation in certain  administrative  proceedings.   It also assists States in as-
suming EPA programs by providing advice and assistance.

1983 ^Program Request

      The Agency requests $2,474,700  in  Salaries  and Expenses and 61.4 permanent
workyears for this  program.   This  decrease of $400,400 and  13.8  permanent work-
years from 1982  reflects efficiencies resulting  from improved integration of le-
al and enforcement activities.  In 1983,  the program will  continue to provide le-
gal advice and consultation to Regional  managers.   Regional  Counsels will act as
lead EPA attorneys  on defensive litigation  involving Regional issues.   Other ma-
jor activities will include reviewing State legal  authorities and advising States
on program assumption  matters  related to the Resource  Conservation  and Recovery
Act and other statutes; providing support to the construction grants program; as-
sisting States in changing statutes and  regulations resulting from amendments to
EPA's administrative  statutes; and coordination with the enforcement litigation
program.
                                     MS-47

-------
                                         MANAGEMENT 8 SUPPORT

                                          Agency Management
                               Office of Policy and Resource Management

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982

                                              (DOLLARS IN THOUSANDS)
PROGRAM
Program Management
Office of Policy *
Resource Management
 Salaries * Expenses

Resource Management
 Salaries * Expenses

Program Integration
Project
 Salaries 8 Expenses

Office of the
Comptroller
 Salaries S Expenses

Policy Analysis
 Salaries it Expenses

Standards 8
Regulations
 Salaries 8 Expenses
  $979.9
  $162.8



$2,583.7


$7,300.1



$3,145.9
           $9,370.7
  $604.8     $604.8     $724.0    $119.2
$4,978.9   $2,500.0   $3,667.0  $1,167.0
$2,293.8   $2,293.8   $2,063.5   -$230.3
$9,233.8   $7,616.9   $8,433.0    $816.1
$3,546.3   $3,201.1   $3,574.0    $372.9

-------
                                                           MANAGEMENT 4 SUPPORT
3
C/1
I
Management Systems 4
Evaluation
 Salaries & Expenses

Office of Legislation
 Salaries A Expenses

Office of Legislation
 Salaries & Expenses

Office of Planning 4
Management
 Salaries S Expenses

Office of Planning I
Evaluation
 Salaries 4 Expenses

TOTAL:
 Salaries 4 Expenses

Office of Policy and
Resource Management    TOTAL
                                                            Agency Management
                                                 Office of Policy and Resource Management

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE  +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983    DECREASE  -
                                                                   1982        1982       1982             1983 VS 1982

                                                                (DOLLARS IN THOUSANDS)
                                                     $1,328.7
                                                       $597.9
$1.555.3   $2.033.0   $2.155.1    $122.1
  $738.2     $667.3     $835.9    $168.6
                                                                $1,462.7
                                                                $1,404.9
                                                               $22,480.7
                                                    $16,099.0  $34,719.0  $22,951.1   $18.916.9   $21,452.5   $2,535.6
                                                    $16,099.0  $34,719.0  $22,951.1   $18,916.9   $21,452.5   $2,535.6

-------
                                         MANAGEMENT * SUPPORT

                                          Agency Management
                               Office of Policy and Resource Management

PERMANENT FULL-TIME HORKYEARS
Program Management
Office of Policy S
Resource Management
Resource Management
Program Integration
Project
Office of the
Comptroller
Policy Analysis
Standards A
Regulations
Management Systems £
Evaluation
Office of Legislation
ACTUAL JANUARY
1981 ESTIMATE 1
1982

13.6
223.1
.8
56.3
37.7
21.3
19.3
12.6 34.8
MARCH CURRENT ESTIMATE INCREASE +
:STIHATE ESTIMATE 1983 DECREASE -
1982 1982 1983 VS 1982

11.0 11.0 14.0 3.0

30.0 17.1 21.0 3.9
46.4 48.4 45.0 -3.4
38.5 37.5 32.1 -5.4
31.2 31.2 29.3 -1.9
20.4 35.4 36.2 .8
16.5 16.1 15.5 -.6
Office of Planning *                              1-5.3
Management

-------
                                         MANAGEMENT S SUPPORT
                                          Agency Management
                               Office of Policy and Resource Management

Office of Planning «
Evaluation
TOTAL PERMANENT WORKYEARS
TOTAL WORK YEARS
Program Management
Office of Pollcr «
Resource Management
Resource Management
Program Integration
Project
Office of the
Comptroller
Policy Analysis
Standards &
Regulations
ACTUAL JANUARY MARCH
1981 ESTIMATE ESTIMATE
1982 1982
140.1
161,6 413.3 194.0

24,1 17.1
290.2
4,8 30.0
6§.7 63.4
65.2 68.5
5Z.3 54.2
CURRENT
ESTIMATE
1982

196.7

17.0

17.1
6S.4
64.2
54.2
ESTIMATE INCREASE •*•
1983 DECREASE -
1983 VS 1982

193.1 -3.6

19.1 2.1

21.0 3.9
56.7 -8.7
55.3 -8.9
53.5 -,7
Management Systems 
-------
3:                  Evaluation
VI
I
                                                            HAMABEMEMT 8 SUPPORT


                                                             Agency Management

                                                  Office of Policy and Resource Management

Office of Legislation
Office of Planning 4
ACTUAL JANUARY
1981 ESTIMATE
1982
42.6
31.7
MARCH
ESTIHATE
1982


CURRENT
ESTIMATE
1982


ESTIHATE INCREASE +
1983 DECREASE -
1983 VS 1982


                   Management


                   Office of Planning 8                             207.2
                   TOTAL HORKYEARS                       261.7      571.7      287.4      287.9      272.1      -15.8

-------
                            MANAGEMENT AMD SUPPORT

                              Agency Management

                   Office of Policy and Resource Management

Budget Request

     The Agency requests a total  of $21,452,500 for Salaries and Expenses and
193.1 permanent workyears for 1983.  This increase of $2,535,600 and decrease
of 3.6 permanent workyears from 1982 will support this office's efforts to
Introduce regulatory reform.

Program Description

     The Office of Policy and Resource Management (OPRM),  headed by the Assistant
Administrator, directs the Agency's regulation review process,  formulates Agency
policy, and allocates the Agency's resources.  OPRM is responsible for reviewing
all EPA regulations to ensure consistency with Agency policy, coordinating all  in-
ternal Agency reviews of regulations, and leading the Agency's regulatory reform
activities.  Formulation of policy 1s stimulated by OPRM's analyses of the econo-
mic, energy, and environmental effects of EPA'S regulations, policies and programs
as well as by evaluations of the effectiveness of ongoing  Agency programs.

     OPRM also provides special studies and analyses to support Agency decision-
making processes in both management and program areas.  Analysis of existing and
proposed legislation, amendments, and Congressional committee hearings, as well
as preparation of reports on Congressional actions and new legislation, are addi-
tional OPRM functions.  Finally, OPRM is responsible for the Agency's'central
planning and budgeting process which allocates workyear and financial resources
and ensures adequate fund control.  A brief description of each of the program
elements included In OPRM follows.

     Program Management - Policy and Resource Management — This program element
supports'the Assistant Aojjiimstrator's Immediate Office and provides policy direc-
tion, planning functions, and the budgeting and resource management activities
within OPRM.

     Program Integration Project — Resources to provide an analytic framework
for integrating the toxics activities of EPA's major programs are included here.

     Office of the Comptroller — This component develops and operates the EPA's
program plannlng and budgeting system; analyzes and prepares Agency budgets for
submission to the Congress and OMB; and maintains the Agency's allocation, control,
and review system for all workyear and financial resources.

     Policy Analysis — This program element contains resources to analyze all
EPA regulations, polIdes and programs from the perspective of their economic,
energy and environmental Impacts and benefits.

     Standards and Regu1 at1 ons -- Activities in this program element include man-
agement 6? the Agencyrs regulation development and review process, design of the
Agency's regulatory reform activities, and development of innovative approaches
to regulation.

     ManagementSystems and Evaluation -- Resources to operate the Agency's ac-
countability system, •implement necessary management reforms, and evaluate program
effectiveness are Included In this component.

     Office of Legislation ~ This program element contains resources to develop
supporting data and analysis for the Administrator's legislative program.
                                      MS-S3

-------
PROGRAM MANAGEMENT — OFFICE OF POLICY AMD RESOURCE HAMAGEHEHT

1981 Accomp 1 i shments

     In 1981, with $979.900 In Salaries and Expenses and 13.6 permanent workyears,
OPRM created an organization structure to centralize those administrative and bud-
getary functions previously  performed by  other organizations within  the Agency-
In 1981, the previous  Office of Planning and Management was  reorganized and di-
vided into the Office of Administration  and  the Office of Policy and Resource Man-
agement (OPRM).  This office conducted special  analyses, developed the budget and
managed the resources devoted to OPRM, and directed the Implementation of reforms
designed to reduce duplication of functions, programs,  and responsibilities with-
in OPRM.

1 962 Explanation of Changes from January Budget Estimate

                January               March               Current
                Estimate             Estimate            Estimate

                                     $604,800            $604,800

     The net increase of +5604,800 results from the following action:

     -  Reorganization.   (+$604,800)   The   Office  of  Planning  and  Evaluation
     ana the Office  of Planning  and Management  have  been eliminated  and their
     resources distributed  to  the   Office   of  Policy  and  Resource  Management
     and Office of Administration.

     Program
     in 1982,  the  Agency is  allocating  a total  of $604,800 and  11.0  permanent
workyears to this activity, all of which is for Salaries and Expenses.   These re-
sources support the basic budgetary, administrative, analytic and planning activi-
ties necessary to manage the Office of Policy and Resource Management and its com-
ponent offices.

1983 Program Request

     The Agency requests a total  of $724,000 and 14.0 permanent workyears for this
activity, all of which  is for Salaries and Expenses.   This  Increase  of $119,200
and 3.0 permanent workyears over  1982 will allow OPRM to Implement reforms designed
to reduce duplications and  streamline administrative and  budget  functions  1n or-
der to provide  Increased analytic support to the Assistant  Administrator  and to
provide improved managerial support for OPRM's component offices.

PROGRAM INTEGRATION; PROJECT

1981 ftccomp 11 shments

     In 1981, with $162,800 for the Salaries and Expenses and 0.8 permanent work-
years, this staff developed an Integrated framework for toxics control  which con-
tained three alternative but Interrelated  approaches (industry, chemical, and geo-
graphic).

1982 Explanation of Changes from January Budget Estimate

                 January             March               Current
                 Estimate           Estimate             Estimate

                                  $4,978,900           S2, 500,000

     The net increase  of +52,500,000 results  from several  actions, as  follows:
                                     MS-54

-------
     "  Reorganization.   (+$4,978,900)   The  Office  of  Planning  and  Evaluation
     was eliminated  and  Its  resources  were  distributed through the  Office  of
     Policy and Resource Management.

     "  ^programming.  (-$12,000)   During the development of the  operating plan,
     several miscellaneous reprogrammings, which are not  reportable to  Congress,
     were made to  this activity  and resulted  in a  net  decrease  of  -$12,000.

     -  Congresslonal Act1pns.  (-$3,944,800)   The  Congressional  earmarked  Sal*
     aries and Expenses reduction to Planning and Evaluation Contracts  -$500,000
     was applied to  this  activity  in  final  action  on  our 1982 Appropriation
     Bill.

        An additional  reduction of  -$3,444,800 was  applied to the Salaries  and
     Expenses appropriation to meet Congressionally mandated appropriation  levels.

     -  Transfer Author1 ty.   (+$1,477,900)   This transfers the  resources  from
     multi-media Energy Env1ronmental  Processes and  Effects to  fully  fund  the
     contracts for the Program Integration Project.

1982 Program

     In 1982, the Agency  Is  allocating  a total  of $2,500,000  and 17.1  permanent
workyears to this activity, all  of which 1s for Salaries and Expenses.   These re*
sources are used to focus on the Industry and geographic methodologies  formulated
in 1981.   The  Agency's senior management  is now evaluating the Individual  ap-
proaches in order to  Identify those  aspects of each approach which require further
refinements.  Both  approaches are being extended  to  cover ecological effects and
will analyze the statistical validity of other aspects of the models  developed in
1981.  The  geographic approach 1s  being  refined to  enhance  its usefulness  to
State and local governments.

1983 Program Request

     The Agency  requests  a  total  of 53,667,000  and 21.0  permanent workyears  for
this activity, all  of which Is for Salaries and  Expenses.  This represents an in-
crease of  $1,167,000  and  3.9 workyears  from 1982.  This  increase will  allow the
Program Integration Project to support the Implementation  of specific  industrial
and geographic  Integration programs —  based  upon  the approaches developed  in
1981 and 1982 -- and  which will contain policy directions affecting many of  EPA's
program activities.

OFFICE OF THE COMPTROLLER

1981 Accomplishments                                              '

     In 1981, with $2,583,700 and 56.3 permanent workyears, the Office of the Comp-
troller (OC) redesigned, Implemented and directed the Agency  1n new procedures for
and approaches to the formulation of the Agency's budget.

1982 Explanation of Changes fromJanuary Budget Estimate

                  January              March             Current
                 Estimate             Estimate          Estimate

                                    $2,293,800         $2,293,800

     The net Increase of +$2,293,800 results from the following action:

     -  Reorganization.   (+$2,293,800)   The  Office  of Resources Management has
     been eliminated  and  its  resources  distributed  to  this  newly  established
     office  In the Office of Policy and Resource Management.
                                     MS-55

-------
1962 Program

     In 1982, the Agency is  allocating $2,293,800 and 48.4 workyears, all of which
is for Salaries and Expenses.  With these  resources, the Office of the Comptroller
continues to improve its analytic bas^jfor the projection of outlays.   To support
budget development, OC is implementing'management improvements in the  budget pro-
cess and reviewing  and  improving the Agency's workload models and activity pric-
ing analyses.   The Comptroller  also  provides  special  analyses  to support  top
Agency management in  effective decision-making  regarding  key resource and policy
issues.

1983Program Request

     The Agency requests $2,063,500 and 45.0 permanent workyears for 1983, all  of
which is for Salaries and Expenses.  This represents a decrease  of $230,300  and
3.4 workyears from 1982, and reflects savings resulting  from management Improve-
ments made in  the  budget process during 1982.  With these  resources,  the Office
of the Comptroller will  direct the planning and budgeting process used by top man-
agement to resolve major policy  and resource  allocation issues  for  the 1984 bud-
get process, provide  resource analysis, information and assistance to all  head-
quarters and Regional  management offices,  and conduct analyses of resource trends
to provide a better link between planning, budgeting and resource use.

POLICY ANALYSIS

1981Accompli shments

     In 1981, with $7,300,100 and 37.7  permanent workyears,  this office developed
(with the General  Counsel) and implemented (with the Office of'Enforcement Policy)
the steel stretch-out  policy,  performed  the first cost-benefit analysis of a major
regulation (steel  effluent  guidelines), coordinated and  followed up on the auto-
mobile relief package,  improved  procedures  for Issuing permits, and  conducted  a
major study  of  the  cost-effectiveness  of   EPA's  air  and  water  regulations.

1982 Explanation of Changes from January Budget Estimate

                   January           March              Current
                   Estimate          Estimate          Estimate

                                   $9,233,800         $7,616,900

     The net increase of +$7,616,900 results from several   actions, as  follows:

     *  Reorganization.    (+$9,233,800)   The  Office of  Planning and  Evaluation
     was eliminated and its  resources  were  distributed through  the  Office  of
     Policy and Resource Management.

     "  Reprograjping.   (+$6,900)  During the development pf the operating plan,
     several miscellaneous  reprogrammings, which are not  reportable to Congress,
     were made  to this  activity and  resulted  in  a  net  Increase  of  +$6,900.

     -  Cpngressipnal Actions.   (-$1,623,800)  A  reduction  of -$1,623,800  was
     applied to the Salaries  and Expenses appropriation to meet  Congressionally
     mandated appropriation levels.

1982 Program

     The Agency is allocating $7,616,900 and 37.5 permanent  workyears  to this ac-
tivity, all in  the Salaries and Expenses appropriation.  In  1982,  the Office  of
Policy Analysis (OPA) is focusing on  regulatory reform which  is  consistent with
the Administration's  overall  economic   revitalization  program.   Our efforts  in-
clude; identifying  opportunities for  regulatory  relief  through the  revision  of
specific existing  regulations;   restructuring  whole programs to  make  them more
                                     MS-56

-------
responsive; and ensuring  that program offices  develop  regulations in  which  the
marginal benefits accrued exceed the marginal  costs imposed.

     OPA's activities to  identify  the most cost-effective regulatory  approaches
fan into four general categories:   (1) cost-benefit and cost-effectiveness anal-
ysis as  required  by Executive  Order 12291  (for  all  major  regulations);  (2)  stra-
tegic studies examining the effects  of all EPA regulations (combined) on major  in-
dustries; (3) development of major regulations;  and (4)  other special  studies  and
services.

1983 Program Request

     The Agency requests $8,433,000 and 32.1 permanent workyears, all in the Sala-
ries and Expenses appropriation.   This  represents  an increase of  $816,100  and  a
decrease of 5.4 workyears from 1982.  In 1983, the increase in extramural  funding
will allow OPA  to introduce improvements in the Agency's  regulatory  development
process, as mandated by Executive Order 12291.

     In 1983, OPA will increase its efforts in cost-benefit and regulatory impact
analysis and continue its  efforts to demonstrate and quantify the benefits  associ-
ated with an additional  8-10 major regulations, thereby increasing OPA's knowledge
in this  area  and  improving EPA's ability to develop and  deliver  more  economical
regulations.

     In support of regulation development,  OPA will conduct analyses of major reg-
ulatory changes resulting  from amendments to the Clean  Air and  Clean  Water Acts.
OPA will coordinate regulation development  across  similar programs (such  as RCRA
and Superfund for hazardous wastes).   OPA will continue Its  strategic  studies
which examine the cumulative  impacts  of EPA's  regulations  on major  industries
(e.g., chemicals, trucks, lead).

STANDARDS AND REGULATIONS

1981 Accomplishments

     In 1981, with S3,145,900  and  21.3 permanent workyears, the Office of Stan-
dards and Regulations (OSR) prepared the Information Collection Budget which con-
tained, for the first time, all Agency information burdens imposed on the  public.
OSR developed initial  policy guidance to Implement the Regulatory  Flexibility  Act
and made revisions in the regulation development process to accommodate  the  new
requirements of Executive Order 12291.  It reviewed 20  major  and 200 nonmajor
rules.  OSR Incorporated the bubble-emission trading policy into the Agency's  air
pollution control  strategies.

1982 Explanation of Changes fram^January Budget Estimate

                   January            March            Current
                   Estimate          Estimate         Estimate

                                   $3,546,300       $3.201,100

     The net  Increase  of +$3,201,100 results  from several actions, as follows:

     "  Reorganization,   (+$3,546,300)   The • Office of  Planning   and  Evaluation
     was eliminatedand  Its  resources  were  distributed through  the   Office  of
     Policy and Resource Management.

     -  Reprograircnlng.  (-$50,000)   During the development of the  operating plan,
     several miscellaneous  reprogrammings, which are not  reportable to Congress,
     were made  to this  activity  and  resulted  in  a net  decrease of  -$50,000.

     -  Congressional Actions.  (-$295,200)  A reduction of -$295,200 was  applied
     to the Salaries""1 arid  Expenses  appropriation to meet Congressionally mandated
     appropriation levels.
                                      MS-57

-------
1982 Program

     The Agency is allocating $3,201,100 and 31.2 permanent workyears to this ac-
tivity, all  of  which Is for  Salaries  and Expenses.  OSR will  review  four major
Agency data collection activities and make recommendations to reduce the reporting
burden and Improve the practical utility of Information collected.  OSR  will  co-
ordinate reviews  of  existing  rules to  ease the  burden  on  small business  and
Issue detailed  operating  guidance to the  public.   OSR will  Improve the quality
and efficiency of the Agency's Internal review process as  well as provide techni-
cal/statistical  policy oversight of the Agency's regulations under review.   OSR
will develop a  "bubble"  approach to water regulation; Institutionalize the envi-
ronmental auditor concept; and prepare a strategy for indirect offsets.

1983 Program Request

     In 1983 the Agency  requests $3,574,000  and  29.3 permanent  workyears, all In
the Salaries and Expenses appropriation.  This represents  an Increase of $372,900
and a  decrease  of 1.9 permanent workyears  from  1982.  This level of resources
will allow OSR  to  continue  to reduce excessive paperwork  burdens  of EPA regula-
tions through the application of sound statistical  methods  and  rigorous Indepen-
dent analysis.  The  review  of existing rules and  policies  will be a  continuing
activity in 1983,  OSR procedural improvements will focus  on early and  meaningful
State involvement 1n the rule development process.   OSR will institutionalize In-
direct offsets, implement fully the water bubble program,  and lead efforts to de-
velop reform Initiatives In the pesticides program.

MANAGEMENT SYSTEMS AMD EVALUATION

1981 Accomp'l 1 shments

     The Agency obligated $1,328,700 and 19.3 permanent workyears, all In the Sala-
ries and Expenses appropriation  in 1981.   With these resources,  the Office of Man-
agement Systems and Evaluation (OMSE) designed an Agency-wide accountability sys-
tem for the Administrator and two specialized, program-specific tracking programs.
OMSE also completed a  full  study of the State-EPA process and the Agency's dele-
gation status.  Regulations  governing  procurement were revised, and an  analysis
of the need  for continuous  compliance by air  pollution  sources  was  completed.

1982 Explanation of Changes from January Budget Estimate

                 January             March                Current
                Estimate            Estimate             Estimate

                                  $1,555,300            $2,033,000

     The net increase  of +$2,033,000  results  from several  actions, as  follows:

     "  Reorganization.  (+$1,555,300)   This office  was created as the result of
     the stimfnation  of  the  Office of Planning and  Evaluation  and the Office of
     Resources Management.

     "  Deprogramming.   (+$589,600)  The  Agency-wide  reprogramming provided  re*-
     sourcesto establish  an accountability  function in  the  Office   of  Manage-
     ment Systems and  Evaluation and,  in addition, provided additional resources
     for the Immediate Office of the Assistant Administrator  for  Solid Waste and
     Emergency Response.  (This reprogramming was Included 1n a  letter to Congress
     on December 16, 1981).

     -  Cpngressional Actions.   (-ST11,900)  A reduction of -$111,900 was applied
     to the  SITaries  and Expenses appropriation  to meet Congressionally mandated
     appropriation levels.
                                     MS-58

-------
1982 Program

     The Agency 1s allocating $2,033,000 and 35.4 permanent workyears  to this  ac-
tivity 1n 1982, all  of which 1s 1n the Salaries  and Expenses appropriation.  OMSE
is completing  five  evaluations  on Agency-wide Issues and  monitoring  Implementa-
tion of changes resulting  from  earlier studies.   Work continues on a  comprehen-
sive delegation policy and on  efforts  with  various programs to encourage the  de-
velopment of State capabilities to  administer delegated  programs.   OMSE provides
other analytic and planning services to programs — charting long-term goals  and
activities — and  undertakes initial Implementation of  the Administrator's accoun-
tability system tracking Agency program  commitments.  Through the  accountability
system, OMSE helps evaluate Agency performance and Identifies need  for corrective
action.

19B3 Program Request

     The Agency requests a total  of 52,155,100 and  36.2  permanent  workyears,  all
in the Salaries and Expenses  appropriation.   This represents an Increase of  0.8
permanent workyears and $122,100 from 1982 to fully fund anticipated salary  needs
in 1983.  This level of funding will allow OMSE  to complete the development  of an
Agency strategic  plan  for  program delegation to  the  States, which  reflects  the
Agency's new role  of providing necessary practical  tools  and methods and capacity
building assistance.  OMSE  will ensure  the development of issue-specific strategic
plans (such as the analysis and projection of demand  for laboratory  services  and
assessment of the  private sector's ability to meet that demand), prepare the  Agen-
cy Operating Year  Guidance, and coordinate the Agency's  review and  comment on  the
General Accounting  Office  reports  that  deal  with  EPA  programs and  activities.

     Through the new Management Systems Division, OMSE  will  expand its  efforts  to:
(1) pursue the design and implementation and refinement  of an accountability sys-
tem for the Administrator;  (2) conduct  specific In-depth  quality assurance reviews
of programs to assess  reasons for  failures  to  fulfill  the  goals  and  objectives
agreed upon In the  accountability  system;  (3)  through  the  adaptation  of proven
private sector strategic planning techniques, support the planning and decision-
making process used by  top management; and (4)  promote the  adoption  of baseline
measures for environmental  improvement to assess performance and  help  guide  the
Agency's allocation of  resources  toward  programs  which  help provide the greatest
return in terms of environmental results.

OFFICEQF LEGISLATION

1981 Accompli shments

     In 1981, with 5597,900 and 12.6 permanent workyears,  the Office  of Legisla-
tion (OL) reviewed  legislative  suggestions  from the program  offices  for consis-
tency with the Administrator's  overall  goals and policies and recommended to the
Administrator a package of legislative amendments to be  pursued in  1982 and  1983.
In addition, OL handled 81  hearings and associated  testimony,  and submitted 9 leg-
islative proposals.

1982 Explanation of Changes from January BudgetEstimate


                 January            torch                 Current
                Estimate           Estimate              Estimate

                                   5738,200              $667,300

     The net  Increase  of  +$667,300 results  from  several  actions,  as  follows:

     '  Reorganization.  {+$738,200)   The  Office  of  Legislation  was  dismantled
     and its resources split between two newly established Offices  of Legislation
     and Congressional Liaison.
                                      MS-59

-------
                        (-$9,000)  During the development  of  the  operating plan,
     several miscellaneous reprograinmings, which are not reportable  to  Congress,
     were made  to  this  activity and  resulted  in a  net  decrease  of  -$9,000.

     -  Congressional Actions.  (-$61,900)  The  Congressional  earmarked  reduction
     to the Office of Legislation was  a total  of 5130,000  and -$61,900  in final
     action on our  1982 Appropriation Bill applied to this program in the Salaries
     and Expenses appropriation.

1982 Program

     In 1982, the Agency  is allocating $667,300 and 16.1 workyears to this office,
all of which was for Salaries and Expenses.  OL provides  leadership and support
for special working groups established  within the Agency to draft legislative in-
itiatives in key areas.   It  ensures  that testimony, drafting  of legislation, and
reports on pending and passed legislation will be  performed in  a  timely  fashion.

1983 Program Request

     The Agency requests  a total of $835,900 and 15.5  permanent  workyears, all in
the Salaries and Expenses appropriation,  an increase  of $168,600 and a  decrease
of 0.6 workyears from 1982.   The increase in funding will  allow OL  to  draft tes-
timony, legislation,  and  reports on legislation.   In addition, OL will  be under-
taking formal  oversight  responsibilities for  all  statutorily  mandated  reports
from the Agency  to Congress, and coordinating  any new legislative  initiatives.
                                      MS-60

-------
                                                           MANAGEMENT £  SUPPORT

                                                            Agency Management
                                                         Office  of Admlnlstrati[on

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                         1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                   198E        1982       1982            1983 VS 198Z
                   PROGRAM
                                                                 (DOLLARS  IN THOUSANDS)
i
01
Program Management
Office of
Administration
 Salaries * Expenses

Financial * Grants
Management
 Salaries * Expenses

Contracts Management
 Salaries & Expenses

Personnel
Administration
 Salaries S Expenses

Occupational Health 8
Safety
 Salaries 8 Expenses

Facilities 8 Support
Services
 Salaries ft Expenses
                                                        $920.9
                                                      $6,050.0
$1,030.8   $1,666.0   $2,188.2    $522.2
$6,446.1   $6,588.5   $6.482.2   -$106.3
                                                      $6.441.7    $6,685.5   $6,308.5   $6,670.7   $5,508.0 -$1,162.7
                                                      $6,075.7    $6,778.4   $6,349.0   $5,430.1   $4,596.2   -$833.9
                                                       $714.5     $558,0     $542.2     $539.0     $441.7    -$97.3
                                                      $6,713.7    $6,535.2   $6,768.1   $5,946.0   $4,463.1 -$1,482.9

-------
?
                                         MANAGEMENT 4 SUPPORT

                                          Agency Management      ;
                                       Office of Aifcilnlstratlon

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Other Management
Services
 Salaries * Expenses

TOTAL:
 Salaries A Expenses

Office of
Administration         TOTAL

PERMANENT FULL-TIME WORKYEARS
                                              (DOLLARS IN THOUSANDS)
                                                      $6,728.6   $6,919.7   $6,251.5   $6,995.2   $5,258.3 -$1,736.9
                                                     $33,645.1  $27,476.8  $33,696.2  $33,835.5  $28,937.7 -$4,897.8
                                                     $33,645.1  $27,476.8  $33,696.2  $33,835.5  $28,937.7 -$4,897.8
Program Management
Office of
Administration

Financial & Grants
Management

Contracts Management

Personnel
Administration

Occupational Health &
Safety
                                                          12.0



                                                         162.0


                                                         166.1

                                                         146.0


                                                           9.5
182.6

142.4


 10.0
  7.3



160.4


172,6

128.4


 10.0
 22.0



147.6


155.6

123.1


  9.2
                                  31.0
                                 146.0
            9.0
           -1.6
131.0     -24.6

106.4     -16.7
  8.0
-1.2

-------
                                                            MANAGEMENT 8 SUPPORT
in
I
Of
OJ
                   Occupational  Health I
                   Safety

                   Facilities 4  Support
                   Services
                                                             Agency Management
                                                          Office of A4n1 nl strati on

Facilities S Support
Services
Other Management
Services
TOTAL PERMANENT HORKVEARS
TOTAL WORKfEARS
Program Management
Office of
Administration
Financial S Grants
Management
Contracts Management
Personnel
Administration
ACTUAL JANUARY MARCH CURRENT ESTIMATE INCREASE •«•
1981 ESTIMATE ESTIMATE ESTIMATE 1983 DECREASE -
1982 1982 1982 1983 VS 1982
207.5 191.4 166.4 150.9 140.6 -10.3
149.0 173,5 157.5 140.7 112.6 -28.1
852.1 699.9 802.6 749.1 675.6 -73.5

22.1 19.7 35.6 43.0 7.4
213.3 209.5 195,6 185.1 -10.5
203.7 211.3 201.3 • 184.9 152.5 -32.4
226.5 256.7 242.7 222.6 147.8 -74.8
  9.7
251,8
 10.0
225.8
 10.0
200.8
  9.2
184.2
  8.0
-1.2
162.6     -21.6

-------
1/1
I
8
                                                            MANAGEMENT « SUPPORT

                                                             Agency Management
                                                          Office of Administration

                                                       ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                        1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                   1982       1982       1982            1983 ₯S 1982
                   Other Management
                   Services

                   TOTAL WORKYEARS
  190.3      208.0      192.0      175.4      137.1     -38.3
1,117.4      911.8    1,076.0    1,007.5      836.1    -171.4

-------
                              MANAGEMENT AND SUPPORT

                                Agency Management

                             Office of Administration
Budget Request
     The Agency requests a total  of $28,937,700 of Salaries and Expenses funds  and
675.6 permanent workyears  for the Office  of  Administration 1n 1983, a  decrease
of $4,897,800 and  73.5 permanent workyears from 1982.   This reduction  reflects
savings in administrative overhead consistent  with this  office's overall  workyear
reduction.

Program Description

     The Office of Administration (OA) performs Agency-wide management and support
functions and provides  administrative services  to headquarters and the  Research
Triangle Park and  Cincinnati  field  facilities,  except for  Superfund  activities.

     The Immediate Office of  the  Assistant Administrator  provides  overall  direc-
tion for all OA activities as well as Agency-wide policy regarding  administrative
and support activities.  There are three organizational  components  within the  Of*
flee of Administration  under  the Assistant Administrator.  The Office  of  Fiscal
and Contracts Management is responsible for the Agency's financial accountability,
contracts administration and  grants management.  The Office  of Personnel and  Or-
ganization provides services  in the  areas of personnel  administration  and organi-
zational analysis and administers the Agency's occupational health  and safety pro-
gram,  The  Office  of Management  Information  and Support Services provides data
processing and  library  management,  facilities  acquisition  and  management,   and
general supporting services.   A brief description of each  of the program elements
included in OA follows.

     Program Management - Offi|ce of Adjnlnistratton — This  program element con-
si sts~cnrtnTTJ$si!rE^|fntpnnstralbTrsnrame37ate~ Office  which provides  service
delivery oversight, planning functions,  and performs all of the budgeting and  re-
source management activities  within  OA.

     FinancialandGrants Management --  This program Includes financial management
at headquarters and  nbri-Regl onalfield  offices, Agency-wide  grants policy  and
headquarters grants management.

     Contracts Management —  This program element provides resources  to award  and
administer contracts and small purchases.

     Personnel Administration — This element  provides  personnel policy guidance,
Agency-wide and personnel services such  as staffing, classifying, and training to
headquarters and non-Regional field offices.

     Occupational Health and Safety— This element includes the Agency's occupa-
tional health and  safety program, designed to  maintain safe working conditions
and to protect the health of our employees.

     Facilities and Support Services —  This  program element provides  resources
for facilities  acquisition,  maintenance,  and  management; audiovisual  and  print-
ing operations; personnel  security  and property maintenance and protection;  and
management of the nationwide  support,  headquarters support,  and buildings and  fa-
cilities accounts.

     Other Management Services— Included in  this program element  are:   the Man-
agement Information and Data Systems Division  which provides data processing ser-
                                      MS-65

-------
vices and centralized information  systems development; the Library Systems  Staff
to maintain the Agency's libraries; the Management and Organization Division  re-
sponsible for Agency-wide management analysis  and  directives  management;  and  the
Immediate Offices of the Directors  of  the Office of Personnel and Organization,
the Office of Management Information and Support Services,  and the Offices of  Ad-
ministration at Cincinnati  and Research Triangle Park.

PROGRAM MANAGEMENT - OFFICE OF ADMIMISTRATIpM

1981 Accomplishments

     In 1981, with $920,900 and 12.0 permanent workyears,  the  Immediate Office of
the Assistant Administrator initiated plans  to consolidate  all  of the  analytical,
long-range planning, administrative and budgetary resources of the Office of  Ad-
ministration (OA) into  the  Immediate Office  of the  Assistant Administrator  for
Administration.  This centralized strategic planning force  supervised financial,
grants, and contracts management; computer,  facilities,  and support services;  and
personnel and organizational direction.  Specialized staffs were responsible  for
the long-range planning activities  in these areas, for improving service delivery,
and for management of the OA  budget.   Me also undertook a  major  audit resolution
effort that  cleaned up 97%  of all  outstanding  audits   over   six  months old.

1982 Explanation of Changes from January Budget Estimate

                January               March               Current
                Estimate             Estimate             Estimate

                                   $1,030,800            $1,666,000

     The net increase of  +$1,666,000 results  from several actions,  as  follows:
                    ^    (+$1,030,800) This reorganization transfers the resources
     froi"thIe™rOf?fce'°"!bf Planning and Evaluation  and  the Office of Planning  and
     Management to reflect the establishment of the Office  of Administration  and
     the Office of Policy and Resource Management.

     -  Reprogramming.  (+$783,600)  A reprogramral ng of +$840,200 is for the pur-
     pose of transferring analytical and budget functions from the  operating  of-
     fices in order  to  consolidate these tasks In the  Assistant Administrator's
     Immediate office.  (This reprogrammi ng was included in a letter  to Congress
     on December 16, 1981).

        During the development of the operating plan, several miscellaneous repro-
     grammings,  which are  not  reportable  to  Congress,  were  made  to this activity
     and resulted in a net decrease of -$56,600.

     -  Conjressipnal Action.  (-$148,400)  An additional reduction of -$148,400
     was applied to the salaries  and Expenses appropriation to meet Congressional -
     1y mandated appropriation levels.

3.982 Program

     In 1982. the Agency  is  allocating $1,666,000 and 22 permanent workyears to
this program.  Me are overseeing  action on several  priorities within the Office of
Administration:   improved contracts and grants  management, cost reduction and con-
tainment strategies, better financial management,  initial ADP consolidation, cap-
ital asset management, position  management planning,  and improved service deliv-
ery.  In addition, we anticipate  improved  services and efficiencies to result from
the consolidation,  in  1982,  of  the OA's administrative, budgetary,  analytical,
and long-range planning resources.
                                     MS-66

-------
198_3 Program Request

     The Agency requests $2,188,200 and 31.0 permanent workyears for this  program.
This Increase of $522,200 and 9.0 permanent workyears will allow OA to complete  the
consolidation of administrative, budgetary,  analytical, and  long-range  planning
resources in the AA's Immediate Office.  This  level of funding will  provide senior
management direction to oversee the development of new and  more efficient ways of
providing Agency services.   These resources will provide senior management support
for OA Initiatives to control duplicatlve fund  control  activities  in the program
offices (through further automation  of these  services);  centralize  EPA's  Informa-
tion management  systems; detect and  prevent  fraud, waste,  and abuse of  federal
funds; strengthen cash and credit management; and provide guidance and stimulation
to grant and  contract  regulation simplification efforts.  In  addition,  this  of-
fice will  continue  to  manage the  overall  cost  reduction  programs and  evaluate
EPA's utilization of capital assets.

FIHANCIAL AMD GRANTS .MANAGEMENT

1981 Accompl 1 shments

     In 1981, resources obligated were $6,050,000  and 162.0 permanent workyears,
of which $570,000 was for an interagency  agreement for computer services  required
for operation of the Financial Management system.  In 1981,  we tightened our moni-
toring of the cash management process, resulting in the  reduction  of  outstanding
cash commitments.  We identified areas susceptible to abuse, such as long  distance
telephone use.  and  publicized  the  monitoring of  these  areas.  Me developed  new
grant procedures which  encourage  competition for assistance  projects and should
improve the scientific  quality of our research.   We also explored options to make
the grants delivery  mechanisms  more  flexible  and efficient,  thus producing  in-
creased benefits for the States' environmental  programs.

1982 Explanation of Changes from January  Budget Estimate

                   January             March           Current
                   Estimate           Estimate        Estimate

                                    $6,446,100      $6,588,500

     The net increase  of +$6,588,500 results  from several actions,  as  follows:

     "  Reorganization.  (+$6,446,100)   The  Office of  Resources  Management  has
     been eliminated and its  resources   distributed  to this  newly  established
     Office of the Administration.
                        (+$236,800) During the development of the operating plan,
     several miscellaneous reprogrammings, which are not  reportable  to  Congress,
     were made to  this  activity  and resulted in a  net increase of  +$236,800  to
     this activity.

     -  Congressi onal Acti ons .  (-$94,400)   An  additional reduction  of -$94,400
     was applied to the Salaries and Expenses appropriation  to  meet  the Congres-
     sionally mandated appropriation levels.

1982 Program                                 ;

     The Agency  Is  allocating  $6,588,500  and 147.6 permanent workyears for this
program, of which $450,000 is for financial management computer services.  Me are
installing an automated financial  control  system based on computer prevalidation
of available funds for spending actions which will  interact with other Agency re-
source systems.  Me are implementing an automated travel information system which
provides better management of travel dollars and serves as a basis for the Agency
to make a more equitable distribution of its travel ceiling.   We are revising our
reporting systems  so that  information  can  be provided  In  a form useful  to Agency
line managers.

-------
     In the grants  area,  we are undertaking  projects to  consolidate  and  simplify
EPA's grant programs and are providing administrative  and technical  assistance to
EPA Regional and  headquarters  offices and grantees.   We are reforming our  grant
regulations to eliminate unnecessary requirements and  red tape.   We  are introduc-
ing a pilot program to consolidate and  simplify the  administrative handling  of
State grants.   The  results  of  these activities Mill  be  saved resources,  clearer
accountability, and simplified, more efficient communication with State and  local
governments.

1983 Program Request

     The Agency requests  $6,482,200 and  146.0 permanent workyears for this pro-
gram, a decrease  of $106,300 and 1.6 permanent workyears which  reflects  antici-
pated workload reductions.   Of  the  request,  $490,000 is  for financial management
computer services.   We  will  develop  and provide  guidance for management  and
grantees on the revised (simplified) regulations developed In 1982.   We will pro-
vide Increased automated  services  to  further eliminate duplicative fund  control
activities in  program  offices.   We  will  consolidate  our  financial dispensing
points throughout the  Agency.   Through further  automation,  we  expect to reduce
paperwork within the financial  management area by as much as 25%, We will  devote
resources to managing the Agency's audit coordination function.   This will  include
identifying and tracking all audit exceptions from point of  Issue to final  resolu-
tion.

CONTACTS MANAGEMENT

1981 Accompl i shments

     In 1981,   resources  obligated were $6,441,700 and  166.1 permanent workyears.
We processed 2,400  contract awards, totalling $324 million, and  19,200  purchase
order actions  for $26.2 million.  The level  of competitive contract awards  re-
mains one of the highest for any federal agency, at 82%.  We instituted a  require-
ment for top level program approval  of major contract  plans and  expenditures,  and
Integrated or  consolidated  similar contracts  to avoid duplicative efforts.   We
began integrating  our automated Contracts Information System with  the Financial
Management System.

1982 Explanation of Changes from January Budget Estimate

                   January             March            Current
                   Estimate           Estimate         Estimate

                 $6,685,500         $6,308,500      $6,670,700

     The net  decrease  of -$14,800  results  from several  actions,  as  follows:

                ~ March.    (-$377,000)   This change  represented a decrease  of
     $377,000 from the January budget.

     -  Reprogrammlng.   (+$388,800)   Resources were  reprogrammed to  fully  fund
     worlyearsTn  contracts  and  other  management  services,  resulting in  the
     elimination of the Special Employment Group and Cooperative Student programs.
     These programs were eliminated consistent with  our reduction 1n  other- than-
     permanent workyears.   (This reprogrammlng of +$372,300 was included in a let-
     ter to Congress on December 16, 1981).

        During the development of the operating plan,  several miscellaneous repro-
     grammings, which are  not reportable to Congress, were made to this activity
     and resulted in a net  Increase of +$16,500.

     •  Congressional Actions.   (-$26,600)  A  reduction of -$26,600  was applied
     to the Salaries  and Expenses appropriation  to meet Congressionally mandated
     appropriation levels.
                                     MS-68

-------
1982 Program

     The Agency is allocating $6,670,700 and 155.6 permanent workyears to this pro-
gram.  With these resources, we expect to award 2,100 contract actions,  totalling
up to $300 million, and 21,700 purchase order actions, totalling $33.1 million.  We
are implementing streamlined contracting procedures which  will expedite  Contract
processing.  Also, we have  begun  projects  to  automate the procurement  and  small
purchase systems at headquarters and Research  Triangle Park,  resulting  In greater
efficiency and shorter processing time.  We are  continuing to  negotiate  overhead
rates with EPA contractors and grantees In  support  of  our own operations and Of-
fice of Management and Budget  Circular A-87 (regarding Indirect costs  for  State
and local  governments).   We  also continue to participate with  the Office of Manage-
ment and  Budget  in the  Implementation of  the Federal Acquisition  Regulations.

1983 Program Request

     The Agency requests $5,508,000  and  131.0  permanent workyears for  this pro-
gram.  Reductions of  $1,162,700  and 24.6 permanent workyears  reflect an antici-
pated decrease in  contract  workload.  We anticipate awarding  1,700  contract ac-
tions, totalling up to  $250 million, and  17,400 purchase order actions  for $29
million.  Key  objectives  will  be Increased productivity  and task  simplification
in contracts processing and administration, further automation of the procurement
system, and the institution of  a  project  officer training and certification pro-
gram that  will  aid in  producing more understandable  requests for  procurements
against which our vendors bid.

PERSONNEL ADMINISTRATION - HEADQUARTERS

1981 Accomplishments

     The 1981 resources  obligated in this program  Included  $6,075,700  and  146.0
permanent workyears.   These resources were  used to conduct routine personnel  func-
tions and  to  respond  to  special  initiatives,  which Included  assisting  line man-
agers in workforce planning and position management.   This program  also  upgraded
labor relations activities, Implemented the Agency  Performance Management System
(PMS), and reinstated the personnel  management evaluation  system.

     During the past year,  the  labor-Management  Relations staff  established new
policies and procedures and  was  directly involved in unit certification  questions,
representational  elections,  grievances, arbitrations and  mediations.   PMS policy
development and training  were  completed,  and  all Senior  Executive  Service  (SES)
employees and 488 of  the 3,014 designated merit pay employees were converted to
PMS in October, 1980.  We developed  policy and procedural   guidance  for  operating
personnel  offices to use in conducting self-evaluations, and we completed a  full-
scale, on-site Agency review of one Regional personnel  office.

1982 Explanation of Changes from January Budget Esjtjjhate

                   January             March            Current
                  Estimate            Estimate         Estimate

                $6,778,400          $6,349,000       $5,430,100

     The net  decrease  of -$1,348,300  results  from several  actions, as  follows:

     -  January -March.   (-$429,400)   This  change  represented  a  decrease  of
     $429,400 fromthe January budget.

     -  Reprogramiiilng.   (-$868,800)   Resources  were  reprogrammed to fully fund
     workyears in contracts and other management services, resulting In  the  elim-
     ination of  the  Special Employment  Group  and  Cooperative Student  programs.
     These programs were eliminated  consistent with'our reduction  in other-than-
     permanent workyears.   (This  reprogramtning  of  -$868,100  was  Included  in  a
     letter to Congress on December 16, 1981).
                                     MS-69

-------
        During the development of the operating plan, several miscellaneous repro-
     gramnvings, which are not  reportable to  Congress,  were made to this  activity
     and resulted In a net decrease of -$700,

     -  Congressional Actions.  (-$50,100)   A reduction  of -$50,100 was  applied
     to the Salaries  and  Expenses  appropriation  to  meet  Congressionally  mandated
     appropriation levels.

1982 .Program

     In 1982, the Agency 1s allocating $5,430,100 and 123.1  permanent workyears to
this program.  At this level, the Personnel  Management Division Is  meeting statu-
tory and programmatic requirements which Include: processing staffing, classifica-
tion and other personnel/payrol1  actions; maintaining basic personnel programs in-
cluding employment and training policy, labor and employee relations and personnel
program evaluation; conducting an executive development program for SES candidates
and assisting in workforce planning and leading  position  management studies.   Ad-
ditionally, we are completing implementation of a performance appraisal system for
General Schedule employees and Initiating efforts  to make the  personnel  system,
primarily the Performance Management System, more accomplishment-oriented 1n order
to Improve personnel planning and productivity throughout the Agency.

1983ProgramRequest

     The Agency requests  a total  of $4,596,200  and 106.4  permanent workyears,  a
decrease of $833,900 and 16.7 permanent workyears, to accomplish four major objec-
tives in 1983:   (1)  to assure effective workforce  planning  and position  manage-
ment; (2) to maintain a positive and strong labor relations  program  to deal  effec-
tively with EPA unions; (3)  to assure efficient and effective  administration of
the Performance Management System  mandated  by the Civil  Service Reform Act;  and
(4) to maintain a  viable  program review,  evaluation, and  analytic  capability to
assure that  EPA  personnel policies  and  programs meet the  needs of the  Agency.

     Our personnel management  services  will  meet statutory  and programmatic  re-
quirements.  We will consolidate the Personnel Management Division's special  pro-
grams and  external  employment activities  to utilize resources  more effectively;
reduce personnel  staffing and classification capacities to reflect  reduced Agency
staffing; and  target training and  executive development programs  to  strengthen
Agency management.

OCCIJPATI ONAL HEALTH AMD SAFETY

1981 Accomplishments

     In 1981, $714,500 and 9.5 permanent workyears were obligated to this  program.
With these resources, the Office of Occupational  Health and Safety staff developed
and implemented programs which were  the basis for all  Agency occupational  health
and safety efforts.  These Included  developing job  hazard  analyses  and providing
training to  Improve  and guide employees in  the  safe and  healthful  performance of
their duties; managing the headquarters safety programs; responding  to field situ-
ations where EPA employees were faced with threats to the public health;  developing
an automated system to handle management Information needs for accident and medical
data reporting; promulgating Agency  health and safety  directives;  and  inspecting
and evaluating all EPA occupied facilities.
T9S2 Explanation of Changes from January Budget Estimate
                   January
                   Estimate
 March
Estimate
 Current
Estimate
                   $558,000           $542,200         $539,000

     The net  decrease  of  -$19,000  results from  several  actions,  as  follows:
                                      MS-70

-------
                - March.  (-$15,800)   This  change represents a decrease of $15,800
     from the January  budget,  which resulted  in a  slight  reduction of  health-
     related contracts.

     -  ^ongressi onal Acti ons .   (-$3,200)  A reduction  of $3,200 was -applied  to
     the Salaries  and  fexpenses  appropriation  to meet  Congressional ly  mandated
     levels.

1982 Program

     In 1982, the  Agency  is allocating  $539,000  and 9.2 permanent  workyears  to
this program.  The Occupational Health and Safety staff  is  developing  industrial
hygiene standards for laboratory operations to meet the special missions and needs
of the Agency.  We are Increasing our safety  programs for those EPA  employees who
face serious safety and health  threats.  Our training and education efforts empha-
size the delivery of specialized training to  meet the unique needs of our employ-
ees.  We also are strengthening  our medical  monitoring  activities,  which include
pro-employment,  pre-placement,  and fitness medical evaluations,  to  protect  indi-
vidual workers  and co-workers.  And we  are  continuing  our efforts to  inspect
and evaluate EPA facilities.

1983 Program Request

     The Agency requests a total of $441,700  and 8.0  permanent workyears for this
program, a decrease of $97,300 and 1.2 permanent workyears.   This will  enable  us
to maintain the health and safety program at its current level for a  reduced Agen-
cy workforce and respond  to  new and  unique situations that  may endanger employee
health and safety.

FACILITIES AND SUPPORT SERVICES

1981 Accompli shments

     In 1981, the  resources  obligated  to this  program were  $6,713,700  and  207.5
permanent workyears.  With  these resources,  the  Agency  provided general  office
and building services and  initiated a number of cost containment programs designed
to reduce expenditures and  maximize  the  efficiency of existing headquarters ser-
vices and nationwide costs.

1982 Expl anati on of Changes from January Budget Estimate

                   January             March            Current
                  Estimate            Estimate          Estimate

                 $6,535,200          $6,768,100       $5,946,000

     The net  decrease  of  -$589,200  results from several  actions, as  follows:

     -  January - March.   (+$232,900)   This  change  represented  an Increase  of
     $232,900 from the January budget.

     "  fePr.^PJJIl'LllR'  (-$818,100)  A reprogramming  of  -$347,000 from this pro-
     gram provTdMfbr resources to meet requirements for increased  FTS  telephone
     costs within the Nationwide Support  Costs  program.   The Facilities and Sup-
     port Services account contains resources for communications which  are appro-
     priate for payment of FTS charges.

        A second reprograirrniing  of -$200,000 1s to fully fund workyears 1n contracts
     and other management  services,  resulting  in the elimination of the Special
     Employment Group  and  Cooperative  Student  programs.   These programs were
     eliminated consistent with our  reduction  in  other than permanent  workyears.

        A third  reprogramming  was  for  the purpose of transferring analytical  and
     budget functions  from the  operations  offices  1n  order consolidate  these
                                     MS-71

-------
     tasks In the Assistant  Administrator's  immediate  office (-$30,000).   (These
     reprogramraings totalling -$577,000  were  included  in a  letter to  Congress
     on December 16, 1981).

        During the development of the operating plan, several  miscellaneous repro-
     gramnrings, which are  not reportable to  Congress,  were made to this  activity
     and resulted in a net decrease of -5241,100.

     ~  Conores s i onal Acti on s .  (-$4,000)   A reduction of  -$4,000  was  applied  to
     the Salaries and Expenses appropriation to meet Congressionally mandated ap-
     propriation levels.

1982 Program

     The Agency is allocating $5,946,000 and 150.9 permanent  workyears  to Facili-
ties and Support Services  in 1982.   We are  continuing major  cost containment ef-
forts in three operational areas (mail,  telecommunications, and copying/duplicat-
ing); implementing  nationwide management/user accountablity   systems to  collect
better user data and  to permit  full  job costing  and consistency .in the  delivery
of services; completing  implementation  of  an umbrella support  services  contract
at headquarters; realigning and  consolidating nationwide space holdings to better
utilize the Agency's  resources;  consolidating all  Washington  area  personnel from
Crystal City and the  Fairchild  (Marfair) Building into  Waterside Mall; improving
working conditions at Waterside  Mall  through an aggressive facilities maintenance
management and inspection  program; and  maximizing utilization of  contractor re-
sources through improved contract and project management.

1983 Program Request

     The Agency  requests  a total  of $4,463,100  and  140.6 permanent  workyears.
This decrease of $1,482,900  and 10.3 permanent workyears is  consistent with the
overall reduction in  Agency  workyears.   We will  complete efforts   begun  in 1932
to control  Costs  while  maintaining the overall  current level of  basic  services
in telecommunications, mail, space managment, and facilities  engineering  and con-
struction.  In addition,  the  level  of headquarters contract and project  manage-
ment will be improved,  resulting In  more cost effective use  of contract dollars
and enhanced delivery of services.

      MANAGEMENT SERVICES
1981 Accompl i ahments

     In 1981, $6,728,600  and 149.0 permanent  workyears were  obligated to  this
program.  Accomplishments for each of the many activities included in  this program
element are enumerated below.

     The Management Information and Data Systems Division (MIDSD) assisted program
offices in planning new ADP systems  and managed major application systems includ-
ing the Personnel Management Information System and the Hazardous Waste Data  Man-
agement System.

     The Management and Organization Division  (MOD)  provided in-house  management
consulting services to senior program and staff officials, conducted  studies and
evaluations of Agency management systems  and practices, and  advised  the Adminis-
trator on appropriate actions to take regarding reorganization.

     Library system support  and  services  were  provided at  headquarters. Research
Triangle Park, and Cincinnati.
                                     MS- 72

-------
1982 Explanation of Changes from January Budget Estimate

                  January              March           Current
                  Estimate            Estimate         Estimate

                56,919,700          $6,251,500       $6,995,200

     The net  increase  of  +$75,500  results from  several  actions,  as  follows:

                - March.    (-$668,200)   This change represented a decrease  of
     $668 ,.200 f font the J anuary budget.

     "  ReprP9'"j"ia1ng.   (+$776,400)   A reprogramnring of -5277,000 from this  pro-
     gram was  for  the  purpose  of transferring  analytical  and budget  functions
     from the operations offices in order to consolidate these tasks in the Assis-
     tant Administrator's Immediate office.

        A second reprogramming  of $525,800 Into  this program  1s to  fully  fund
     workyears 1n contracts and other management services,  resulting in the elim-
     ination of  the  Special  Employment Group  and Cooperative  Student Programs.
     These programs were eliminated consistent with  our reduction in  other-than-
     premanent workyears.  (These two reprogrammi ngs totalling +$248,800 were in-
     cluded in a letter to Congress on December 16, 1981).

        During the development of the operating plan,  several miscellaneous repro-
     grammings, which are  not  reportable to Congress, were made to this activity
     and resulted in a net Increase of +$527,600.

     *  C pngres s 1 on a j Actions.  (-$32,700)  A  reduction of -$32,700  was applied
     to the Salaries  and Expenses appropriation  to meet Congress ionally mandated
     appropriation levels-

1982 Program

     The Agency is  allocating $6,995,200 and 140.7 permanent workyears to this  pro-
gram in 1982.  This level of resources enables  these programs to maintain all  es-
sential services at or above  1981 levels.  Major emphasis  during 1982 is on organi-
zational consolidations (particularly of the ADP resources),  reorganizations,  and
on cost reduction and containment in those services provided.

1983 Program Request

     The Agency  requests  a total  of $5,258,300 and  112.6  permanent  workyears to
support this program  In 1983,  a decrease of $1,736,900  and  28.1  permanent work-
years.  The decrease  results from savings realized  through  the consolidation of
AOP activities and of libraries, the transfer  of budgetary  and administrative re-
sources to the  AA's  Immediate Office, and the anticipated  reduction  in workload
based on the Agency's 1983 staffing level.  These  resources  will  support ADP ac-
tivities such  as management of  EPA's  data center  facility  Including  computer
equipment, software packages and  the  telecommunications  network,  and  maintenance
of those systems which are essential to  the Agency's  mission.  We will  provide ADP
planning and systems design assistance to program offices, targeting our resources
toward high priority systems.  Major emphasis will  be placed on  improving the com-
patibility and efficiency  of the  Agency's  automated systems, and the development
of a prototype office automation system.  The  consolidation of all ADP activities
under the Office of Administration will constitute the major ADP activity, result-
ing in increased efficiency 1n  the delivery of ADP services  throughout the Agency.

     The Management and Organization  Division's  (MOD)  analytic efforts  win  con*
tinue to provide organizational analysis and consulting services to senior program
officials in the development and control of Agency organizations, systems and prac-
                                      MS-73

-------
tices.  MOO will  continue  to seek cost effective improvements  to  major Internal
processes and systems and  assist Agency managers  fn  the administration  of forms.
The review procedures for Agency actions and the Agency directives  system will be
modified completely to reflect the need to eliminate ineffective and/or needlessly
costly systems.

     Library systems and services will include:  basic  loan and  reference  ser-
vices; completion of a  single,  automated  catalog  of Agency library holdings; and
provision of rules, hearing records, comments on Agency rule-waking, and publica-
tions in  response to requests  from the public.  Library  procurement  activities
will be  centralized and the Information  Clearinghouse  will  be  maintained and
operated as a reference service for EPA information  managers,
                                      HS-74

-------
  Regional
Management
    SECTION TAB

-------
Page Intentionally Blank

-------
                                         MANAGEMENT 8 SUPPORT

                                         Regional Management

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
PROGRAM
Regional Management
 Salaries & Expenses

Planning, Evaluation
8 Analysis
 Salaries 8 Expenses

Financial Management
(Regions)
 Salaries 8 Expenses

Personnel Management
(Regions)
 Salaries 8 Expenses

Administrative
Management (Regions)
 Salaries 8 Expenses

TOTAL:
 Salaries 8 Expenses

Regional Management    TOTAL
            (DOLLARS IN THOUSANDS)






$10,084.1  $11,506.7   $9,798.5   $9,234.8   $9,087.0   -$147.8




 $3,189.3   $5,187.7   $4,462.9   $4,081.2   $4,646.2    $565.0




 $2,216.9   $2,442.9   $2,261.9   $2,401.6   $2,433.7     $32.1




 $2,618.6   $2,936.7   $2,724.2   $2,746.3   $2,764.1     $17.8



 $5,746.9   $5,939.9   $5,516.5   $5,564.8   $5,398.2   -$166.6


$23,855.8  $28,013.9  $24,764.0  $24,028.7  $24,329.2    $300.5

$23,855.8  $28,013.9  $24,764.0  $24,028.7  $24,329.2    $300.5

-------
                                         MANAGEMENT ft SUPPORT

                                         Regional Management

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS  1982
PERMANENT FULL-TIME WORKYEARS
Regional Management

Planning, Evaluation
& Analysis

Financial Management
(Regions)

Personnel Management
(Regions)

Administrative
Management (Regions)

TOTAL PERMANENT HORKYEARS
233.2      224.0      171.0      171.1      140.3     -30.8

 87.7      140.2      116.2      108.1       94.2     -13.9
 80.5
 80.4
150.2
632.0
 88.8
 93.8
 82.9
 86.8
 84.8
 82.4
 73.8     -11.0
 80.6
-1.8
161.8      152.8      147.9      137.1      -10.8
708.6
609.6
594.3
526.0     -68.3
TOTAL HORKYEARS
Regional Management

Planning, Evaluation
S Analysis

Financial Management
(Regions)
301.2      304.4      249.4      247.0      200.0     -47.0

 99.5      146.6      122.6      114.4       95.2     -19.2
 94.8
100.0
 94.0
 98.9
 81.8     -17.1

-------
                                         MANAGEMENT S SUPPORT

                                         Regional Management

                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                     1901     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Personnel Management                  104.6      112.6      105.6      101.2       98.7      -2.5
(Regions)

Administrative                        191,2      200.5      191.6      186.2      168.3     -17.9
Management (Regions)

TOTAL WORKYEARS                       791.3      864.2      763.2      747.7      644.0    -10J.7

-------
                             MANAGEMENT AND SUPPORT

                              Regional  Management
Budget Request
     The Agency  requests  a  total  of $24,329,200  of  Salaries  and Expenses  and
526.0 permanent  workyears  1n 1983, an  Increase of $300,500, but a decrease  of
68.3 permanent workyears  from 1982.   This decrease reflects savings  In  adminis-
trative overhead  consistent  with  the   Regions'   overall   workyear  reductions.

Program Description

     This component covers the salaries and expenses  of the Regional  Administra-
tors, their immediate staffs, and  the staff  offices reporting directly  to  them.
Additional activities supported  here include  Regional  central  management  func-
tions of  program planning,  analysis, and evaluation;   financial  and  personnel
management, and administrative services.

     RegionalManagement —  This  unit  provides for the Regional  Administrators
and their Immedl"are'"staffs, as well as the basic staff functions  of civil  rights,
public affairs, Congressional and intergovernmental activities.

     Planning, Evaluation, and Analysis  — Resources 1n  this program element pro-
vide anaTy?Tcsu^pTrT^K~fhTT?e^7onaT~Admin1strators to  assure the efficient and
effective operation of EPA Regions.  Support activities include Regional  planning,
budgeting and management and reviews of regulations from the Regional perspective.

     FinancialI Management — This  program element  provides  for  the Regional  of-
fices' financial  accounting activities.

     Personnel Management — These resources  provide basic  personnel services 1n-
cludlng staffing, classifying, and training to the Regional  offices.

     Admini stratiye Management—  This  group of  activities provides  service  1n
the areas of mlnl-computer systems management, library support, safety,  security,
printing and  copying, facilities  management,  small purchases, and other similar
administrative functions.

REGIONAL MANAGEMENT

1981 Accomplishments

     In 1981,  the Agency obligated $10,084,100 and 233.2 permanent workyears, all
of which was  for the  Salaries  and Expenses appropriation.   This  program provided
support for the Regional Administrators and their Immediate staffs, as  well as the
basic staff functions of  civil  rights,  public affairs.  Congressional  and inter-
governmental activities.

1982 Explanation of Changes from January Budget Estimate
                     January
                     Estimate
 March
Estimate
 Current
Estimate
                  $11,506,700     $9,798,500;   $9,234,800

     The net decrease  of -$2,271,900 results  from several actions, as  follows:

     "  January - March.   (-51,708,200)   This  change  represented a decrease  of
     $1,708,200 from  Ihe  January  budget,   which  reflected  reductions  1n  the
     following functional  areas:   Public  Awareness, Congresssional Liaison,  and
     Intergovernmental Relations.   Additionally, the Interagency Regulatory
     Liaison Group  and Minority  Business  Enterprise/External  Compliance  func-
     tions were reduced.
                                     MS-78

-------
                    g*   (-$526,900)  During  the  development  of  the  operating
     pi an, several  miscellaneous  reprogrammings,  which  are  not  repOrtable  to
     Congress, were  made to this  activity and  resulted  in  a  net increase  of
     +5526,900.

     -  Congressional Actions.   (-$278,800)  An additional reduction of -$278,800
     was applied to the SaTaries and Expenses  appropriation to meet Congression-
     ally mandated appropriation levels.

     -  Transfer Authority.   (+$242,000)   The  net  increase  applied  to  this
     activity includes  an  increase  of  +$242,000  to  Salaries  and Expenses  to
     fund necessary operating expenses.

1982 Program

     In 1982, the Agency is  allocating a total  of  $9,234,800  and 171.1  permanent
workyears to this function, all of which  is  for  the  Salaries  and Expenses  appro-
priation.  Basic press  services  and media  relations activities are  being main-
tained as well  as policy  guidance  and executive direction for  the Region  as  a
whole.  Reorganization  studies  are  being undertaken to  improve  internal manage-
tnent control and increase functional  effectiveness.

1983 Program Request

     The Agency requests a total of $9,087,000 and 140.3  permanent  workyears for
this program, all of which is  for the  Salaries and Expenses appropriation.  This
reduction of $147,800 and 30.8  permanent workyears is commensurate with reductions
in Agency resource levels.   Basic functions such as  press  services,  civil  rights
activities, and  Congressional /Intergovernmental  activities  will  be  maintained
at reduced budget levels through streamlined organizational  structures and  staff-
ing patterns.

PUNNING EVAIUATION AND AMAIYSIS -  REGIONS

1981 Accomplishments

     In 1981, the Agency obligated $3,189,300 and 87.7 permanent workyears  to de-
velop and implement new budget and  planning systems  and to redesign Regional  pro-
cesses and  organizations  consistent with  the  Agency-wide reorganization.   These
resources supported the evaluation  of  Agency oversight procedures  for  the Water
Quality, Drinking Water, NPDES, and Pesticides programs.  The  Regions implemented
an "environmental  results-oriented"  planning and tracking system and conducted an
analysis of the status, trends, and barriers for the  delegation of 11 EPA programs
to the  States  and territories-  Twenty-one major analytic projects  requested by
Regional managers were completed.

1982 Explanation of Changes from January Budget Estimate

                     January         March         Current
                     Estimate       Estimate      Estimate

                   $5,187,700     $4,462,900    $4,081,200

     The net decrease  of -$1,106,500  results  from   several actions,  as  follows:

     *  *?a?"?ry.;* Mai"Ch-   (-$724,800)   This  change  represented a decrease  of
     $724,too from the January  budget.

     "  Reprpgramming.   (+$71,700)  During the  development of  the operating plan,
     several mi seel 1 aneous reprogrammings, which are not  reportable to Congress,
     were made  to this  activity  and  resulted in  a  net increase  of  +$71,700.
                                      MS-79

-------
     -  Congressional Actions.  (-$462,600)  An additional reduction of-$462,600
     was applied to theSalaries  and  Expenses  appropriation  to meet Congression-
     al ly mandated appropriation levels.

     -  Transfer Authority.  (+$9,200)  The net increase applied to this activity
     includes anIncrease  of +$9,200  to Salaries and Expenses  to  fund operating
     expenses.

1982Program

     The Agency is allocating $4,081,200 and 108.1 permanent workyears to this ac-
tivity in 1982, all of which is 1n the Salaries and Expenses appropriation.   These
resources are being used to design and Implement the Regional component of the Ad-
ministrator's new accountability system and to manage organization studies  to ad-
just the Regions to projected program, policy,  and resource  changes.   The  Agency
is also implementing procedures designed  to  expedite permit Issuance  in the Re-
gions.  Twenty-six special  analyses which are currently underway  are  being com-
pleted.

1983 Program Request

     The Agency requests $4,646,200 and 94.2 permanent workyears, all of which are
1n the Salaries and  Expenses  appropriation,  to conduct the planning,  evaluation,
and analysis functions  in  the ten Regional  offices.   This represents an increase
of $565,000 and a reduction of 13.9 permanent  workyears  from 1982.  The workyear
reduction reflects elimination of the  State-EPA agreement coordination function.

     The 1983 request level will  allow Regional Administrators to effectively and
efficiently manage their Regions by providing  sound analysis concerning Regional
policy, process, and resource management.  In  1983, the  Regions  will  continue to
emphasize accountability reports, program evaluation, economic  analysis, and im-
provement of Regional  planning,  analytic and management capabilities.

FINANCIAL MANAGEMENT - REGIONS

1981 Accomplishments

     In 1981, resources included  $2,216,900  and 80.5  permanent workyears to pro-
vide basic accounting, payment processing, and  payroll support activities.   During
1981, EPA launched an aggressive cash  management monitoring system throughout its
Regional  accounting offices which has  strengthened significantly our billing and
collection practices.  The Regional Financial Management program completed the de-
sign phase of a system  of fund  control and prevalidation  to compare  obligations
with budget data.

1982 Explanationof Changes from January Budget Estimate
                     January
                     Estimate
 March
Estimate
 Current
Estimate
                   $2.442.900     $2,261,900    $2,401,600

     The net  decrease of  -$41,300  results from  several  actions,  as  follows:

     -  January - March.   (-$181,000)   This 'change  represented  a  decrease  of
     5181,000 from the January budget.

     -  Reprogramnilng.   (+$166,100)   During  the  development of  the  operating
     pi an, several miscellaneous  reprogramni ngs,  which  are  not  reportable  to
     Congress, were  made  to this  activity and  resulted  in  a  net Increase  of
     +$166,100.
                                      MS-80

-------
     -  Congressional Actions.  (-$34,100)   An  additional  reduction  of -$34,100
     was appl i eel  to the  Sal an' es  and  Expenses appropriation  to meet  Congres-
     sTonally mandated appropriation levels.

     -  Transfer Authority.  (+$7,700)  The net Increase applied to this activity
     Includes an  increase  of +$7,700 to Salaries and Expenses  to fund operating
     expenses.

1982 Program

     In 1982, the Agency is allocating $2,401,600 and 84.8 permanent workyears to
this program.  With these  resources,  Financial  Management-Regions is  strengthen-
ing the automated  financial  control  systems, installing  an  automated  system for
prevalidation of  available funds  for  spending  actions,  and  implementing  an in-
ternal control system to  improve EPA's  defense  against  the misuse of  federal re-
sources.  The program  also is ensuring that billing  and  collection  activities
meet the President's commitment to cash management.

1983 Program Request

     The Agency requests $2,433,700 and 73.8 permanent workyears for this program,
an increase of $32,100 and a decrease of 11  permanent workyears.  The  decrease in
workyears reflects anticipated workload reductions.  With  these  resources,  this
program will continue  to provide  all  basic accounting,  payment  processing, and
payroll support activities, and we will increase resources for audit coordination
and follow-up activities   In  the  Regional  finance offices.   This will  Include
tracking of all  audit exceptions from point of issue to final resolution.  Efforts
will continue to  detect  abuse  of  federal  funds, strengthen credit management to
ensure timely and  economical  collection of all  monies  owed EPA, and Implement an
Agency-wide data integrity assurance  program to  provide timely, complete,  and ac-
curate financial reports.

PERSONNEL MANAGEMENT - REGIONS

1981Accomplisnments

     The 1981 resources  obligated to  this  program Included  $2,618,600 and  80.4
permanent workyears.  The Regional  personnel offices provided basic personnel  ser-
vices which  Included  processing  staffing  actions, classification  actions,  pay-
roll/personnel  actions, and training  requests.   The Regional offices  used dele-
gated examining authorities, from the  Office  of Personnel Management,  for making
appointments to clerical,  mid-level,  and  scientific positions.   The offices re-
sponded to new Initiatives required  by  the  Civil  Service Reform Act 1n the areas
of Performance Management  and  Merit  Pay.   Each  Region worked closely  with head-
quarters and their own line managers  In workforce planning and position management
efforts.  Strong  support  was  provided as all Regions reexamined  their organiza-
tional structures and developed new,  more  streamlined operations.  Labor relations
efforts included negotiations and consultations with employee unions.  The Federal
Equal Opportunity  Recruitment Program  for  the   Regions was  implemented  through
existing recruitment channels.

1982 Explanation of Changes from January Budget  Estimate

                     January         March         Current
                     Estimate       Estimate      Estimate

                   $2,936,700     $2,724,200    $2,746,300

     The net decrease  of  -$190,400  results  from  several  actions, as  follows:

     -  January - March.   (-$212,500)   This  change represented   a  decrease  of
     $212,500 from  theJanuary budget, which reflected  a  reduction  in training
     activities.
                                      MS-81

-------
                        (+$43,700)  During the development of the operating plan,
     several miscellaneous reprogrammings, which are not  reportable  to  Congress,
     were made to  this activity  and  resulted  in  a  net  increase of  +$43,700.

     -  Congressional Actions.  (-$38,400)  An  additional  reduction  of -$38,400
     was appl led  to  the  Salaries and  Expenses appropriation  to meet  Congres-
     sionally mandated appropriation levels.
                . Authority.  (+$16,800)   The net increase applied to this activity
     i ncllide s an 1 ncrea se o f +$16,800 to  Salaries and Expenses to  fund  operating
     expenses.

1982 Program

     During 1982, the Agency  is allocating $2,746,300 and 82.4 permanent workyears
for this program.   Regional  personnel  offices continue  to:  process  staffing,
classification, and payroll /personnel  actions, and training requests; provide Per-
formance Management System training for all General Schedule employees;  conduct
day-to-day mandatory, non-discretionary  labor relations activities; provide train-
Ing programs for  supervisory and management  personnel; carry out  effective  work-
force planning; undertake position management studies to assist  management 1n es-
tablishing effective organizational  structures; and  provide special emphasis pro-
grams.

1 983 Program Request

     The Agency requests a total  of $2,764,100 for Salaries and  Expenses and 80.6
permanent workyears to conduct Regional personnel functions  In  1983.  This  is an
increase of $17,800 anJ  a  decrease of  1.8  permanent  workyears.   With  these  re-
sources, the Regional personnel  offices will:  process  staffing,  classification,
and payroll /personnel actions and training  requests; carry  out  mandatory,  non-
discretionary labor relations activities; provide effective workforce  planning;
and conduct training  and special  emphasis programs  to support  the Agency's 1983
Regional workforce.

ApHINISTjRATiyE MANAGEMENT - REGIONS

1 981 Accompl 1 shments

     The 1981 resources obligated  for this  program  Included  $5,746,900  and 150.2
permanent workyears.  This  provided Regional  administrative support in the follow-
ing areas:   administrative  information  systems,  minicomputer  systems,  ADP  ser-
vices, library  support,  safety,  security,   purchasing,  property, supply,  mail,
space management,  printing,   copying,  facilities  management,  word  processing,
records management, and contracts management.

1962 Explanation of Changes from January Budget Estimate

                     January         March        Current
                     Estimate       Estimate      Estimate

                   $5,939,900     $5,516,500    $5,564,800

     The net decrease of  -$375,100  results  from several  actions, as  follows:

                - March.   (-$423,400)   This  change  represented   a  decrease  of
     $423,400 from  the  January budget, which  resulted 1n  a slight  decrease  in
     administrative services to the Regional  programs.

     -  Reprogramming.   (+$208,000)   During  the  development  of  the  operating
     pi an , several  mi seel 1 aneous   reprogrammings,  which  are not  reportable  to
     Congress, were made  to this  activity and  resulted  in a  net  increase  of
     +$208,000.
                                      MS-82

-------
     -  Congressional Actions.  (-$224,100)  An additional  reduction of -$224,100
     was applied to the Salaries and Expenses  appropriation  to  meet Congression-
     ally mandated appropriation levels.

     -  Transfer Authority.  (+$64,400)   The net Increase applied to this activity
     includes an increase of  +$64,400 to  Salaries  and  Expenses  to  fund operating
     expenses.

1982Program

     In 1982, the Agency  is  allocating  a total of $5,564,800 and 147.9 permanent
workyears to Regional administrative support activities.  These  resources are be-
ing used to provide the services discussed above.

1983 Program Request

     The Agency requests a total of $5,398,200  for Salaries and Expenses and 137.1
permanent workyears for 1983.  The decrease  of $166,600 and  10.8 permanent work-
years from 1982 results from reductions in the areas of  property  and supply manage-
ment, In-house computer processing, In-house printing  and  copying  support, tele-
communications, and space management.  We will  Improve the quality and cost effec-
tiveness of Regional  administrative services.
                                       MS-33

-------
Page Intentionally Blank

-------
Support Services
      SECTION TAB

-------
Page Intentionally Blank

-------
s
Nationwide Support
 Salaries & Expenses

Headquarters Support
Services
 Salaries ft Expenses

Regional Support
Services
 Salaries & Expenses

Automated Data
Processing Support Costs
 Salaries 4 Expenses

Professional Training
 Salaries S Expenses

Lab Support
Office of Research 4
Oevelopment
 Salaries & Expenses
                                                          MANAGEMENT S  SUPPORT

                                                             Support Services

                                                      ACTUAL     JANUARY     MARCH      CURRENT   ESTIMATE INCREASE +
                                                       1981      ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                  1982       1982        1982            1983  VS 1982
                                                                (DOLLARS IN THOUSANDS)
                                                    $37,303.2  $45,011.0  $41,210.4  $41,562.3  $46,406.0  $4,843.7
                                                    $22,636.4  $32,659.1   $23,893.7  $22,067.2  $27,024.6  $4,957.4
$11,928.5  $11,750.7  $11,002.3  $11,291.4  $13,350.4  $2,059.0
                                                    $18,870.1   $20,771.0  $20,771.0  $18,310.9  $17,362.2   -$948.7
                                                       $226.9      $550.0     $523.3     $423.3      $502.3     $79.0
                                                     $4,535.,8    $5,071.0    $4,693.8    $4,239.7    $4,710.4     $470.7

-------
                                         MANAGEMENT ft SUPPORT

                                           Support Services

                                    ACTUAL    JANUARY     MARCH     CURRENT
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE
                                                1982       1982       1982
                                                       ESTIMATE INCREASE +
                                                         1983   DECREASE -
                                                               1983 VS 1982
Lab Support
Office of Air, Noise
S Radiation
 Salaries « Expenses

Lab Support
Office of Pesticides
& Toxic Substances
 Salaries & Expenses

TOTAL:
 Salaries S Expenses

Support Services
TOTAL
                                              (DOLLARS IN THOUSANDS)
            $1,230.4   $1,673.0   $1,409.1   $1,409.1   $2,178.5    $769.4
              $136.8
                         $141.1
$141.1
$151.4
$10.3
$96,868.1 $117,333.8 $103,644.7  $99,445.0 $111,685.8 $12,240.8

$96,868.1 $117,495.8 $103,644.7  $99,445.0 $111,685.8 $12.240.8

-------
                             MANAGEMENT AND SUPPORT

                                Support Services

Budget Request

     The Agency requests  a  total  of $111,685,800 of  Salaries  and Expenses funds
for support services  in  1983,  an  increase  of $12,240,800 from 1982 that will  al-
low the Agency to meet rising rent, telephone, and utility costs.

Program Djsj;rjptjqn                -           x

     The Agency support  service component  provides funds  for  general  support to
all Agency  programs  except  Superfund.   Programs  under  support  services  are:

     Nat i onwi de Support — Agency-wide costs for the following support functions:
f . ac i 1 i ties rental  a nd as soc i at ed costs; payments to  the U.S.  Postal Service; Fed-
eral Telecommunications  Service  (FTS);  security investigations;  reimbursements
to the Federal Employees Compensation Fund; payments to the Public Health Service
for personnel administration services  for  commissioned officers assigned to EPA;
and contracts for EPA's occupational health and safety program.

     Headquarters Support Services -- Local office and building service costs for
headquarters and the  f 1 el d  of?i ces at RTP, North Carolina  and Cincinnati, Ohio.

     Regional Support Services — Local support costs  such as utilities, telephone
equipment and service costs,  and minicomputer operations  for the Regional offices.

     ADP Support Costs -- Resources  to operate the Agency's  computer processing
center at RTP.  ""

     Prof essi gnal  Traini ng -<- Funds for Agency-wide training programs such as su-
pervisory management and performance management systems.

                 - PRO — Resources  to provide  basic facilities  and  operations
        ^
and maintenance costs  for  ORD laboratories not in Research  Triangle Park,  North
Carolina or Cincinnati, Ohio.

     Lab Support -.. OANR —  Funds  for basic  facilities and  maintenance  costs to
support the Motor Vehicle  Emissions Laboratory, the  Eastern Environmental  Radia-
tion Facility, and the Las Vegas facility,

     Lab S up port . » OPTS — Basic facilities  operations and  maintenance costs for
the 1 aboratqr i es i n Belt svi 11 e, Maryland and Bay St Louis, Mississippi.

.NATIONWIDE SUPPORT

1981 Accompjishments

     The 1981 resources obligated for this program included 537,993,800 for Sala-
ries and Expenses to  provide Agency-wide  support  serv1ces_  including rent,  mail,
Federal Telecommunications Service  (FTS),  security investigations,  and other ba-
sic and necessary support  for the Agency's workforce.   In 1981,  we began several
efforts to  contain  costs  in  the  areas of telecommunications  and mail delivery.

1982 ExiJlanatio^ of .£hi»ngg^^frojn ^January Biiidgjet. Estimate

              January                March                 Current
             Estimate               Estljnate              Estimate

          545,011,000            $41,210,400           $41,562,300

     The net decrease  of -$3,448,700  results  from several  actions, as  follows:
                                     MS-86

-------
     '  ja"uj?ry. - March.   (-$3,800,600)   This change  represented  a decrease  of
     §3,800,600 from the  January  budget, which  reflected  reductions of  support
     services.  This was  directly  related to the  reduction  in ftgency  workyears
     and to a slow down in the acquisition of additional  office space.

     "  Peprogramming.   (+$1,319,600)  This  reprogramrai ng  provided  for  resources
     to meet requirements for increased FTS telephone costs within  the Nationwide
     Support program.  The Facilities  and  Support Services account  contains  re-
     sources for communications which are appropriate for payment of FTS charges.
     (This reprogramming of +$1,319,600  was  included in  a letter to Congress  on
     December 16, 1981).

     -  Congressional Actions.  (-$967,700)  A Congressional  earmarked  reduction
     to this  activity  of  -5870,000 was  applied  to  the  Salaries  and  Expenses
     appropriation reflecting  final  action  on   our  1982  Appropriation  Bill.

        An additional reduction of  -$97,700  was  applied  to the Salaries  and  Ex-
     penses appropriation to meet Congressionally  mandated appropriation levels.

1982 Program

     In 1982, the Agency is allocating $41,562,300 for nationwide  support.   Sub-
stantial rate  Increases  for  space  rental,  long  distance telephones and  postage
necessitated the  additional  resources  in 1982.   We  are Introducing programs  In
1982 (to be  continued  and expanded In 1983)  to  contain  future nationwide  costs
by establishing  greater  program  accountability  1n service areas (e.g., mail  and
telecommunications); promoting efficiencies and economies through service consoli-
dations; and  promoting  an improved, mutually .beneficial, .operating  relationship
with the General  Services Administration  (GSA).  In addition,  in late 1982 we plan
to evacuate space at Crystal  City and  the Fairchild  building  and consolidate  our
headquarters operations in Waterside Mall.   We also will  effect a 15% -  20%  space
reduction In the Regions.

1983 Program Request

     The Agency requests a total  of $46,406,000, an increase  of $4,843,700 from
1982,  As in  1982,  this  Increase  reflects rapidly escalating, but  mandatory  na-
tionwide support costs which more than offset  savings  attained through  cost con-
tainment strategies, internal  financial  controls,  and reduced service  require^.
ments.  For instance, the  savings  in  rent resulting from the  space  to  be relin-
quished in late 1982 will be more than offset by the increase  in rental  costs  of
the space retained.

             SUPPORT SERVICES
1 981 Accompl i shments

     In 1981, the Agency obligated $22,636,400  for  Salaries  and Expenses to pro-
vide the following support services to all program operations  at EPA headquarters,
RTP, North Carolina and Cincinnati,  Ohio:

     *• Office and Building Services.  This includes costs such as building mainten-
       ance, telephone equipment and local,  services, utilities,  office  supplies,
       audiovisual, printing  and  guard  service,  and the  rental,  purchase,  and
       maintenance of equipment.

     - ADP Technical Support.   These  funds  provide the central  ADP staff with con-
       tractor support for systems development and evaluation and other  technical
       services required to   support  and control  the Agency's ADP  activities.
                                     MS-87

-------
     - Library Services.  This funds library contract operations and provides for
       the purchase of books and  periodicals, literature searches, and information
       retrieval.

     In order to effect needed cost reductions for the 1981  budget, $2 million in
services were eliminated.   This Included reducing weekend utilities and the number
of guards and their hours of duty, and eliminating all but essential  printing and
audiovisual services.

1982 Explanation of Changesfrom January Budget Estimate

                 January              March            Current
                 Estimate            Estimate          Estimate

              $32,659,100         $23,893,700       $22,067,200

     The net decrease  of  -$10,591,900 results from several actions,  as  follows:

     "  January - March.   (-$8,765,400)   This  change  represented  a  decrease  of
     $8,765,400 from  the  January  budget,  which  reflected cancellation of  the
     major ADP  system aquisition  projects  that  had  been  planned  in accordance
     with OMB Circular A-109.

     ~  ReprpgrammTno..  (-$1,319,600)  This reprogramming provided  for resources
     to meet requirements  for Increased  FTS telephone  costs  within  the Nation-
     wide Support  program.  This account  contains  resources  for  communications
     which are appropriate for payment  of  FTS charges.  (This  reprogramming  of
     -SI ,319,600 was  included 1n  a letter  to Congress  on December  16,  1981),

     ~  CongressionalActions.  (-$506,900)  A reduction of -$505,900 was applied
     to the Salaries and  Expenses  appropriation to  meet Congressionally mandated
     appropriation levels.

1982 Program

     In 1982, the  Agency  is  allocating  a total of  $22,067,200  for  Salaries and
Expenses to headquarters  support costs.   This  decrease  of $569,200 provides full
funding for basic services such as office supplies,  telephones, utilities,  equip-
ment rentals, facilities maintenance contracts, and  scientific and  technical pub-
lications.

1983 Program Request

     The Agency requests a total  of  $27,024,600 for Salaries and Expenses in 1983,
an increase of $4,957,400  from 1982.  We have proposed a level  of funding adequate
to continue basic headquarters support services at reduced staffing levels  and to
provide for rate and  cost increases.   We will  continue our effort begun in 1982
to contain these costs through strengthening internal  financial controls.

REGIONAL SUPPORT SERVICES

.1.981... Accompli shments

     In 1981, the Agency  obligated  $11,928,500 to provide a central  fund in each
Regional office to purchase basic  support services  for Regional  programs.   These
services included:  utilities, telephone  equipment  and local   service costs,  ofr
fice and laboratory facility and  equipment maintenance, office supplies, printing,
duplicating, minicomputer and  word  processor operation, health units,  ADP contract
support* and library operations and supplies.
                                     MS-88

-------
1932 Explanation of Changes from January Budget Estimate

               January               March                Current
              Estimate              Estimate             Estijna_te

             $11,750,700           $11,002,300          $11,291,400

     The net decrease  of  -$459,300  results  from several  actions,  as  follows:

     -  January - March.   (-$748,400)   This  change   represented  a  decrease  of
     $748,400 from the  January budget,  which  reflected a reduction  in the  level
     of Regional support services provided.

     "  Reprogramm1n|.   (+$139,700)   During  the  development  of  the operating
     plan, several  miscellaneous  reprogrammings,  which  are  not  reportable  to
     Congress,  were made  to this  activity  and  resulted  1n  a  net  increase  of
     +$139,700.

     -  Congressional  Actions.   (*$363,100)  A reduction of -$363,100 was applied
     to the Salaries and  Expenses  appropriation  to meet Congressionally  mandated
     appropriation levels.

     -  Transfer Authority.   (+$512,500)   The  net   Increase   applied  to   this
     activity includes  an increase  of  +$512,500 to  Salaries  and  Expenses  to
     fund essential operating support costs,

1982 Program

     In 1982, the  Agency  is  allocating  a total of $11,291,400 from  the  Salaries
and Expenses appropriation to Regional  support.   These funds will limit  support
to only mandatory  items,  such as  telephone service, utility, supply, printing,
equipment purchase, minicomputer operations,  and  minor  office alterations costs.

1983 Program Request

     The Agency requests  a total of  $13,350,400  1n Salaries and  Expenses, an in-
crease of  $2,059,000  from 1982.   This  request reflects  our proposed decreased
staffing levels and actions  to  reduce and contain costs.   However,  savings  from
these actions will be  offset by  known cost  increases.  Funding  will  be  provided
for all essential support services.

ADP SUPPORT COSTS

1981 Accomplishments

     The Agency obligated $18,870,100 in 1981   for the EPA  National Computer  Cen-
ter at Research Triangle  Park,  North  Carolina  to  provide  ADP machine services to
all Agency  programs.   These services are provided through contractor operation
of EPA owned and leased equipment.   In 1981, we refined the budget process to re-
quire user organizations  to  budget for  ADP  services.  This change,  which trans-
formed timeshare service  from  a  "free  good"  to  one  that competes for resources
within each user organization,  1s resulting  in more judicious use of this  service.

1982 Explanation ^of^Changes from January Bud|bt Estimate

              January                  March              Current
              Estimate           "     .Estimate           Estimate

           $20,771,000              $20,771,000        $18,310,900

     The net decrease  of -$2,460,100 results  from several actions,  as  follows:

     -  Reprogratrmlng.   (-$450,000)   A  reprog ramming  of -$150,000  is  for  the
                                      MS-89

-------
     purpose of transferring analytical and budget functions  from the  operations
     offices in order to consolidate these tasks  1n the Assistant Administrator's
     immediate office.

        A second reprogrammlng  of $450,000 transferred resources devoted to  the
     Interagency Agreement (IA6) with  Parklawn  Computer Center from ADP  Support
     to the Financial  Management Division (-$450,000).   (These two reprogrammlngs,
     totalling -$600,000 were  included in a letter to Congress on December  16,
     1981).

        During the development  of  the  operating plan,  several  miscellaneous  re-
     programmings,  which are not reportable to Congress, were made  to  this  acti-
     vity and resulted in a net increase of +$150,000.

     -  Congressipnal Acti ons.  (-$2,010,100) An additional reduction  of  $2,010,100
     was applied to the salaries and Expenses appropriation  to meet Congression-
     ally mandated appropriation levels.

1982 Program

     In 1982, the Agency is allocating $18,310,900 to provide ADP timesharing ser-
vices.  This amount reflects a  stabilization of computer capacity and the  absence
of some non-recurring cost expenditures 1n 1981.

1983 Program Request

     The Agency requests a total of $17,362,200  from Salaries and Expenses,  a de-
crease of 5948,700 from 1982.   This decrease reflects anticipated efficiencies and
elimination of dupHcative systems  that are expected  to result  from the  planned
consolidation of Agency-wide ADP resources.

PROFESSIONALTRAINING

1981 Accomplishments

     In 1981, the Agency  obligated $226,900 to provide for professional  training
for EPA employees.  This  funded:   Office  of Personnel  Management mandated super-
visory training;  long-term  training;   Industry  exchange  programs;  contractual
training courses for upward mobility, middle and supervisory management; executive
development; and technical training.
1982 Explanation of Changes from January Budget Estimate
                January
               Estimate
 March
Estimate
 Current
Estimate
               5550,000               5523,300          $423,300

     the net decrease  of  -$126,700  results  from several  actions,  as  follows:
                - March.   (-526,700)   This  change  represented  a  decrease  of
     $26,70U from the January budget to Salaries and Expenses.

     -  Congressional Actlpns. (-5100,000) An  additional  reduction  of  -$100,000
     was applied to the Salaries and  Expenses  appropriation  to  meet  Congressi on-
     ally mandated appropriation levels.

1982 Program

     In 1982, the Agency 1s allocating $423,300 for professional training activi-
ties.  With these resources, we are  implementing the Seniqr Executive Service Can-
didate Program mandated by the Civil Service Reform Act.
                                     MS-90

-------
1983 ProgramJRejuest

     For 1983, the Agency requests a total of $502,300  from  the  Salaries  and Ex-
penses appropriation, an increase  of  $79,000 from 1982.  This request  maintains
current professional  training efforts.

LABSUPPORT — RESEARCH AND DEVELOPMENT

1981 Accomplishments

     In 1981, the Agency obligated $4,535,800 for  Salaries and Expenses for this
program activity.  These  funds provided  for the  basic  facility operations  and
maintenance costs required  to operate ORD's remote laboratories (those not  located
at Research Triangle Park,  North  Carolina,  and Cincinnati,  Ohio).   Services  in-
cluded were  telephones,  utilities, janitorial  and  guard  services,  as well  as
equipment and facilities maintenance.

1982 Explanation of Changes from January Budget Estimate

                January                March             Current
                Estimate               Estimate         Estimate

              $5,071,000             $4,693,800        $4,239,700

     The net  decrease  of -$831,300  results  from  several  actions,  as follows:

     "  January - March.   (-$377,200)   This  change  represented a  decrease  of
     $377,200 from"the January budget.

     *•  Congresjilflnal Act ions.  (-$454,100)   A reduction of -$454,100 was  applied
     to the SaTirfes₯ridExpenses  appropriation to meet Congressionally mandated
     appropriation levels.

1982 Program

     In 1982, the Agency is allocating  a total  of $4,239,700  for  Salaries  and Ex»
penses to this program.  The 1982 program Supports  the same type  of  activities as
in 1981, since these  services —  basic laboratory operations and maintenance --
are required on a continuing basis.

1983 Program Request

     The Agency requests a total of $4,710,400 for Salaries and  Expenses for this
program.  The Increase  of $470,700 will  cover increased utility, fuel,  and main-
tenance costs, including costs deferred in 1982.

LAB SUPPORT — AIR. NOISE ANDRADIATION

19811Accompl 1 shments

     In 1981, the Agency obligated $1,230,400.  This activity supported  the Motor
Vehicle Emissions Laboratory in Ann Arbor, Michigan, the Eastern Environmental Ra-
diation Facility  in  Montgomery, Alabama, and the  Las Vegas  facility in  Nevada,
These funds  provided  for the basic facilisties  operations  and maintenance costs
necessary to  support  these laboratories.  These  costs included  security,  jani-
torial and maintenance services, utilities,  GSA vehicles, supplies and materials,
and communications.
                                     MS-91

-------
1982 Explanation of Changes from January Budget Estimate

                 January             March              Current
                Estimate            Estimate            Estimate

              $1,673,000          $1,409,100          $1,409,100

     The net decrease  of  -$263,900  results   from  several  actions,  as  follows:

     ~  January - March.   (-$122,800)   This   change  represented  a  decrease of
     $122,601) from the January budget.

     -  Restructuring.  (-$141,100)   A transfer of -$141,100 out  of  this program
     into Lab  support *• Office  of  Pesticides   and  Toxic  Substances  will  fund
     basic laboratory support expenses.

1982 Program

     In 1982,  the  Agency Is  allocating  a total of  $1,409,100 to support  these
three laboratories.  The 1982 program supports the same type of activities  as in
1981, as  these services — basic  laboratory operations  and  maintenance — are
required on a continuing basis.

1983 Program Request

     The Agency requests a total  of $2,178,500 for  Salaries and Expenses  for this
activity.  The Increase  of $769,400  will fund  laboratory support costs  for the
Office of Air, Noise and Radiation and provides for  conducting facility  mainten-
ance deferred from 1982.

LAB SUPPORT -- PESTiCIDES AND TOXIC SUBSTANCES

1981Accomp1Ishments


     In 1981, the Agency obligated $136,800 for Salaries and Expenses.  These re-
sources provided the  basic facilities  operations  and  maintenance costs   for the
laboratories in  Beltsville,  Maryland and Bay  St.  Louis, Mississippi.   Services
provided in  this  activity  included  utilities,  security, communications,  rental
fees, warehouslngj  custodial  services,  general   facility maintenance,  office
supplies, and building repair and maintenance.

1982 Explanation of Changes from January Budget Estimate

               January               March                Current
              Estimate              Estimate              Estimate

                                    $141,100              $141,100

     The net Increase of +$141,100 results from the following  action:

     -  Restructuring.   ($141,500)   A transfer  of  +$141,100  into this  program
     from the Lab  Support  - Office  of  A1r,  Noise  and Radiation  will  fund  basic
     laboratory support expenses.       ;

1982 Program

     In 1982, the Agency is  allocating a  total  of  $141,100  from Salaries and Ex-
penses.  The 1982 program  supports the  same  type of  activities as In 1981,  since
these services  —  basic laboratory  operations and  maintenance  -^ are  required
on a continuing basis.
                                      MS-92

-------
1983Program Request

     The Agency requests a total of 5151,400 from Salaries and Expenses.  This Is
an increase of $10,300 over 1982.  These resources will  provide for Increased
costs In utilities and communications, as well as to support continuing require-
ments for general  maintenance and laboratory support.
                                      MS-93

-------
Buildings and
   Facilities
     SECTION TAB

-------
Page Intentionally Blank

-------
                                                               BUILDINGS AND FACILITIES
00
T


APPROPRIATION
Buildings « Facilities
TOTAL, Buildings and Facilities
OUTLAYS
AUTHORIZATION LEVELS
*
PROGRAM HIGHLIGHTS
New Facilities
Buildings S Facilities
Repairs S Improvements
Buildings S Facilities
BUILDINGS AND FACILITIES TOTAL
ACTUAL
1981

$3,104.4
$3,104.4
$1,454.5
By virtue

$386.4
$2,718.0
$3,104.4
JANUARY
ESTIMATE
1982
(DOLLARS
$6,646.0
$6,646.0
MARCH
ESTIMATE
1982
IN THOUSANDS)
$4,115.0
$4,115.0
$3,965.0 $3,700.0
of Appropriation Act.


$6,646.0
$6,646.0


$4,115,0
$4,115.0
CURRENT
ESTIMATE
1982

$3,621.0
$3,621.0
$3,537.0


$3,621.0
$3,621.0
ESTIMATE INCREASE +
1983 DECREASE -
1983 VS 1982

$3,000.0 -$621.0
$3,000.0 -$621.0
$3,559.0 $22.0
-

$3,000.0 -$621.0
$3,000.0 -$621.0

-------
                             BUILDINGS AMD FACILITIES


OVERVIEM ANDSTRATEGY

     The Buildings and  Facilities  appropriation  funds the design,  construction,
repair, and Improvement of buildings occupied by EPA, whether federally-owned or
leased.

     In 1981, EPA began an analysis of Its capital  budget and  facilities  program
to ensure that Agency laboratories  met health and safety  standards  for operations
and could handle safely the high-hazard samples  gathered by hazardous  waste  site
Inspection and permitting activities under the Resource Conservation and Recovery
Act.  The first phase of this analysis documented widespread health and safety de-
ficiencies 1n  EPA  laboratories. Including  Inadequate ventilation,  Insufficient
hazardous material  storage areas, and a need for partial-containment areas In all
laboratories performing analytical  chemistry.  To correct these  deficiencies, the
Agency deferred all  essential maintenance other  than  emergency  repairs, and  can-
celled plans to upgrade laboratory  capabilities  In several  locations.   All  uncom-
mitted funds from the 1981 Buildings and  Facilities appropriation  and the entire
1982 appropriation were earmarked to correct known health and  safety deficiencies
and Install appropriate pollution control  devices.

     The second phase  of the  capital budget analysis will produce  policies and
procedures to link more  explicitly laboratory and  other  capital Investment plans
to EPA program requirements and to establish the appropriate balance  between EPA
laboratory capacity  and  reliance on commercial  and other non-EPA laboratories.
                                      BF-2

-------
                          BUILDING AND FACILITIES

SUMMARY OF INCREASES AND DECREASES
                                                       (in thousands of dollars)
     1982 Buildings and Facilities Program..	           $3,621.0
         The decrease reflects the Agency's qomple-                -621.0
         tton of health  and safety projects  conducted
         1n 1981 and 1982.
     1983 Buildings and Facilities Program..	...           $3,000.0
SUMMARYOF CHANGESTO JANUARY 1982 BUDGET ESTIMATE
                                                       (in thousands of dollars)
     January 1982 Estimate.......	           $6,646.0
        January-March	           -2,531.0
        Congressional Actions	             -494.0
        A decrease  of $494,000 to Buildings and Facili-
        ties was taken  against the  March estimate  to
        reflect the September 12% reduction.
     Current 1982 Estimate...	           $3,621.0
                                       BF-3

-------
                             BUILDINGS AMD FACILITIES
BudgetRequest
     The Agency requests $3,000,000 for 1983 in the Buildings and Facilities Appro-
priation, a decrease  of $621,000 from  1982.   This decrease  1s possible  because
the Agency  will  complete  most of  Its  health  and  safety  projects  1n  1982.

Program Description

     This appropriation covers the design and construction of new EPA facilities,
as well as  necessary  repairs and Improvements  to buildings  already occupied  by
EPA, whether federally~owned  or leased.  The program contains the  following  two
program elements.

     New Facilities - This Includes engineering and design services and construc-
tion costs of new, federally-owned facilities to be occupied  by  EPA or the expan-
sion of existing federally-owned, EPA occupied facilities.

     Repairs! and Improvements - This covers major  repairs and capital  Improvements
to any Dull dings or fact11ties occupied by EPA.  Most of these projects relate to
the correction of health and safety deficiencies, the prevention of serious deteri-
oration, or pollution control.

MEM FACILITIES

1981 Accoiaplishments .       .        .

     In 1981, the Agency obligated $413,800 in  this  program element for the design
and construction of  the P1ne  Bluff  Incinerator  and additional  work at the  Gulf
Breeze Environmental Assessment Laboratory.

1982 Program

     There are no funds allocated for this activity in 1982.

1983Program Request

     No funds are requested for new facilities 1n 1983.

REPAIRSAND IMPROVEMENTS

1981Accomplishments

     In 1981, with $2,718,000, the Agency began the bulk, of the repair and Improve-
ment projects undertaken to correct health and safety conditions or maintain pro-
perty.  EPA began  a  major initiative to standardize  all  Agency  fumehoods and to
bring existing substandard fumehoods Into compliance..

1982Explanation ofChangesfrom January Budget Estimate

                 January          March          Current
                Estimate        Estimate     ,   Estimate

              $6,646,000      $4,115,000      $3,621,000

     The net decrease  of -$3,025,000 results  from  several actions,  as  follows:

     " January - March.   {-$2,531,000)   The  reduction  of $2,531,000  represented
     a deferment of  all  routine maintenance projects, such as  repairs  to roofs,
     sidewalks, floors, and exterior building maintenance.
                                      BF-4

-------
      - Congressslonal Action.   (-$494,000)   A  reduction  of *$494,QOO  was taken
      against the  March  estimate  reflecting the  September  12$ reduction  to  the
      Buildings and Facilities appropriation.  This reduction will be accomplished
      by cancelling  or deferring  repair  and improvement items.   These reductions
      will be  made to some  preventive  maintenance type projects  and  some health
      and safety projects.

 1982  Program

      The Agency is allocating $3,621,000 to continue correcting health and safety
 deficiencies and  installing pollution  control  devices  in  EPA  laboratories  in
 1982.  This  Includes projects  to:   upgrade  fumehoods and  ventilation, install
 sewage disposal systems,  provide  safe  storage for hazardous and toxic materials,
 modify emergency exits, upgrade electrical systems, and modify or  replace fire de-
 tection systems.  We  are  continuing the fumehood certification program this year.

      Funds will be  spent to reconfigure  Waterside Mall to accommodate  personnel
 being moved in  from  Crystal City and  the  Fairchlld Building.  The  character  of
 the facility will be  upgraded to  provide reasonable  working conditions.   We will
 defer other  essential  maintenance  and  program  expansion  projects  originally
 planned for 1982 pending  the correction  of health, safety,  and pollution control
 deficiencies and the  reconfiguring of the Waterside complex.

 1983  Program Request

      The Agency requests  $3,000,000 in 1983 for engineering, design and  construc-
 tion  related to health  and  safety,  preventive maintenance,  and emergency repairs
 at selected  EPA facilities.  This  decrease of $621,000  is  possible  because the
 Agency will complete most of its health and safety  projects  in 1982.  We will con-
 tinue the  fumehood  certification program,  as well as  reinstitute the preventive
 maintenance program deferred  In  1982.    In  line with  reforms  introduced in 1981
 and 1982, this  request  earmarks funds  for emergency  repairs and engineering ser-
 vices essential to  the  timely  and effective  obligation of  buildings  and facili-
 ties  funds.  Also  Included Is  $750,000 for space planning, reconfigurations and
 alterations associated  with space  reductions begun in 1982.   JhIjLISSBl£Sii_JLD»
             dJjlL^

                                ~'~'
Expenses  appropriation  contafns~'ji!L~'fljnI^^
<--J3U- - ^- - • - — , - — - -—__!_£— - — — — -
                                     BF-S

-------
Page Intentionally Blank

-------
Construction
   Grants
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                   CONSTRUCT Hit! l-RAHTS
ACTUAL
1981

JAMUAffY
ESTIMATE
19A2
MAUCH
ESTIMATE
1002
CUP.RDIT
ESTIIIATI.
1W2
ESTIMATE
1983

INCREASE +
DECREASE -
1983 VS 19P.2'
                                                  (POLLARS I'l TilWlSAIIOS)
Appropriation

Obligations
 Appropriation
 Contract Authority
51,604,837.0

$3,941,567.1
(3,711,267.1)
  (-2 30,-3 00. h)
$3,700,000.0
S2,400,00i].i)   $2,400,000.0
$4,050,000.0    51,100,000.0    S3,4()'),4W.O    $2,400,000.0   51,009,458.0
('1,'JfiO, 000.0}   (1,100,000.0)   (3,409,4!.«.0)   (2,400,000.0)   (1,009,458.0)
{...)(     ...     )   (     ...     )   (     ...     )   I     ...     )
Outlays
 Appropriation
 Contract Authority

Liquidation of Contract
-Authority

Authorization Levels
$3,881,172.7     $4,230,000.0     S3,840,000.0   $4,050,000.0   $3,350,000.0    -$700,000.0
(2,769,fi72.7)    (3,030,000.0}    (-2,640,000,0)   (3,200,0(10.0)  (2,950,000.0)   (-250,000.0)
(1,111,300.'0)    (1,200,000.0)    (1,200,000.0)     (050,000.0)    (400,000.0)   (-450,000.0)


SI,700,000.0     $1,000,00(1.f)     -SI,000,000.0   51,000,000.1)        ...      -51,000,000.0

$5,950,000.0     $h,95()yOOO.O     S2,400,000.0   52,400,000.0   $2,600,000.0     $200,000.0
  Met obligations in 1981 are $300 million  loss,  and '".40ii i-iil lion less in
  1982 an.1 19«3.

-------
Page Intentionally Blank

-------
                                  ACTUAL
                                   1981
                                                  CONSTRUCTION GRANTS
                                                JANUARY
                                                ESTIMATE
                                                  1982
                                   MARCH
                                  ESTIMATE
                                    1982
                 CURRENT
                 ESTIMATE
                   1982
ESTIMATE
  1983
INCREASE +
DECREASE -
1933 VS 1982
                                                 (DOLLARS IN THOUSANDS)
Appropriation

Obligations
 Appropriation
 Contract Authority
                            $1,604,837.0     $3,700,000.0
$3,941,567,1
(3,711,267.1)
  (230,300.0)
                                             $4,950,000.0
                                             (4,950,000.0)
                                                $2,400,000.0   $2,400,000.0
$1,100,000.0   $3,496-.458.0   $2,400,000.0   $1,009,458.0
(1,100,000.0  (3,49ft,458.0)  (2,400,000.0)   (1,009,458.0
Outlays
 Appropriation
 Contract Authority

Liquidation of Contract
 Authority

Authorization Levels
                            $3,881,172.7     $4,230,000.0    $3,840,000.0   $4,050,000.0   $3,350,000.0    -$700,000.0
                            (2,769,872.7)    (3,030,000.0)   (2,640,000.0)  (3,200,000.0)  (2.950,000.0)    (-250,000.0)
                            (1,111,300.0)    (1,200,000.0)   (1,200,000.0)    (850,000.0)    (400,000.0)    (-450,000.0)


                            $1,700,000.0     $1,000,000.0    $1,000,000.0   $1,000,000.0        ...      -$1,000,000.0

                            $5,950.000.0     $5,950,000.0    $2,400,000.0   $2,400,000.0   $2,600,000.0   $MB8tW&*e-
* Net obligations In 1981 are $300 million less, and $400 million less In
  1982 and 1983.

-------
                               CONSTRUCTION GRANTS

BudgetRequest

      An appropriation of $2,400,000,000  is  requested  for 1983 for the municipal
construction grants  program established  under  Title II  of  the Clean  Water Act
(CWA), as  amended.   These  amendments  provide for more  cost-effective targeting
of the municipal  waste treatment construction grant program administered  by the
Environmental Protection  Agency.  The  amendments will  reduce long-term  expen-
ditures for  capital  investments, relieving the burden on  the Federal  Government
for financing projects that  improve  the  environment  marginally  or not  at all
without sacrificing our objective of cleaner water.

     Obligations for  1983  are expected  to total  $2,400,000,000,  a decrease  of
$1,009,458,000 from  1982.   This  decrease  is  attributable to a decline  in total
funds as a  result of  the  reduction  in carryover  funds  from one  fiscal year to
the next.  Outlays will decrease by $700,000,000 in 1983 to a total of
$3,350,000,000.

     Program objectives through  1983  will be as  follows:  1) to  accelerate the
rate and level of delegation to  the  States;  2) to simplify  and streamline regu-
latory requirements  and  propose  legislative reforms  where  appropriate;  3)  to
enhance the performance of  grant-supported facilities; 4)  to direct scarce funds
to projects  which are affordable and  offer  the greatest  potential  for improve-
ment of water quality; 5)  to improve the  basis  for  project  funding decisions to
assure that costs are adequately considered  and  minimized; 6) to  minimize  waste,
fraud, and abuse  and  ensure effective use of grant  funds; and  7)  to provide for
optimum program and  financial management  in  cooperation with the  .States,  empha-
sizing results-oriented achievement of program objectives.

Progra'n DescrTptton

     This program provides  grants to  municipal  and intermunicipal agencies  to
assist in financing the construction  of  cost-effective and environmentally sound
municipal wastewater  treatment   facilities.   In addition,  the program provides
funds to assist delegated States in carrying out their responsibilities to manage
the Construction Grants program  and to assist them in  carrying  out water quality
management planning programs.

     From its annual   construction  grants  allotment a  State  may  reserve  four
percent or $400,000 to manage Its delegated activities,  and  one percent or $100,000
for water quality management planning,.   The Act  also  requires that  each State
set aside between four and  seven and  a half  percent of  its  allotment  to provide
incentives to  communities  to  use  innovative  and  alternative technologies  in
constructing their wastewater treatment facilities;  it also  requires that  States
having substantial rural  populations  set  aside  four percent of their  funds for
projects in  small communities.   All grants for assisting  in  the development and
construction of wastewater  treatment  facilities are to  be awarded  on  the basis
of a State's priority system which  is designed  to ensure improved  water quality.

     Prior to the 1981  amendments,   projects were  done  in three  stages  with
separate grants  awarded  to  a  community  for  the  planning  (Step 1),  design
(Step 2), and construction (Step 3)  phases  of each project.   In order to  make
the process more efficient,  the 1981 amendment? eliminate the three step procedure
and provide  that  communities that have   completed planning  and design and  are
awarded a grant for construction will  receive an  allowance to cover a  portion  of
the planning and  design  costs.   Provision is also  made for advances  to  enable
small   communities,   otherwise   unable to finance  such activities, to plan and
design projects.   Other  provisions  designed  to  make the program  more  efficient
and cost-effective include the elimination of funding to  construct reserve capa-
city.  These  provisions   are expected to  significantly  decrease  the  Federal
Investment needed in the program.
                                       CG-2

-------
     The goal  of the  State management  assistance grant  program under  Section
205(g) is  to  allow the  States,  rather  than EPA,  to  assume responsibility  for
day-to-day management  of construction  grants  and  other priority programs,  and
under Section  205(j).. to provide essential  support to  water quality  management
planning,  the  primary  goal  for  use  of  Section  205(g)  funds  has been  early
achievement of maximum delegation  of construction grants project management  to
States.  The timing and extent of delegation and  financial  support to  each  State
depends on the State's  ability  to  operate  a construction  grants  program that
meets statutory  objectives  and requirements  and  EPA policy.   A  grant is provided
to a State when  it  can show that it  is  able  to exercise  effective management  for
a substantial portion of program activities.

     A total   of  46  States  are expected  to have  signed  delegation agreements  by
the end  of 1983, with approximately 25 of the  States  fully  del gated  by that
time.  EPA will  continue  to exercise  significant project management  responsi-
bilities in  remaining nondelegated  and partially delegated States and  Terri-
tories.  EPA  is  working  with all States to  increase the  rate and level  of dele-
gation and  to  ensure effective overall  results-oriented  program  management.
With the continuing assistance  of the U.S.  Army  Corps  of Engineers in priority
construction management  activities,  EPA is  restructuring its role  from project
management to  overall  program management, State  training,  and  State  management
assistance.

     EPA has established a detailed review process related to funding of advanced
waste treatment  projects.   This  review  ensures  that  such  funding  is  strictly
limited to those situations where the higher level of treatment Is both necessary
to meet water quality standards and will be effective in meeting higher standards.

     In accordance  with  Congressional directives,  the Administrator  is reviewing
all waste  treatment  projects  involving  treatment levels  more  stringent  than
secondary, as  defined,  where the incremental cost of the advanced  component  is
greater than  $3,000,000.   The review of these projects  will  not  be  delegated to
the Regions,  but will be  performed  by  EPA  staff  in Headquarters;  the Regional
Offices will   be  responsible for review  of  similar projects  with an incremental
cost of less than $3,000,000. Agency resources for these activities are contained
in another program  element.

1981 Accomplishments

     In 1981,  Congress  rescinded  $1,700,000,000  in  construction   grants  funds
to reduce  Federal  expenditures   and  to  meet  national  economic  objectives.   Even
with the reduced availability of  funds  during  1981,  awards  in  the  construction
grants program totaled  $3,941,567,000,  and  included 549 Step 1,  588 Step 2,  346
Step 2+3,  and 616  Step  3 awards.   This level  of activity resulted  in 11,934
active projects  in  various stages of planning,  design,  and construction  by the
end of  the year.   The level of Federal  outlays  was  $3,881,173,000, with  602
Step 3/2+3  projects completed during  the year.   Since  1973,  a  total  of  3,795
projects have  been  completed and brought into  operation, representing  45% of the
approximately 8,000 total awards for construction.

     EPA initiated  a number of legislative, regulatory, and administrative reforms
in 1981.   Working  with the  States,  EPA developed and submitted  to  the Congress
significant reforms in the  construction grants  program designed to  reduce the
need for Federal funds and to provide a more cost-effective focus to the program
emphasizing water quality improvements.

     These reforms,  as passed by the Congress,  provide  for  a  more  streamlined,
cost-effective program.  Complementing the legislative reforms, EPA also developed
proposed revisions  to  regulations  to  simplify  and   streamline program  admin-
istration  and  to provide much increased flexibility to States.

     During  1981, progress  also was made in accelerating  the delegation of project
and program  management  responsibility to the States under Section 205(g) of the
                                      CG-3

-------
Clean Water Act.   Seven States signed delegation agreements, bringing  the total
of States  with  signed  agreements  to 45.  Of these  States, a  total  of  12  were
considered to be fully delegated.  As of the end of 1981, States were responsible
for 58 percent of the total program as represented by numbers of staff committed.

1982 Program

     Based on the passage  by  Congress  of necessary  legislative reforms,  the
Administration has  requested  funding  at  a  level   of  $2,400,000,000.    These
legislative reforms eliminate  eligibility  for low priority  projects,  scale  down
future demand  for Federal  funds,  and  direct  scarce  funds to those  projects
offering the greatest potential for water quality improvement.

     With a  supplemental  appropriation  at the  requested  funding  level,  693
new awards are  expected to  total  $3,409,500,000,  This  level  of  activity  will
result in a total  of 8,078 active projects  by  year  end.  This level  of  Federal
outlays, 34,050,000,000,  will  be the  second highest  annual  total  In the history
of the program.   Including  the 1,186 Step 3 construction  projects  completed and
brought into operation during the year, 55%  of  all grants  for construction since
1973 will  be completed.

     Using resources reported elsewhere In this budget, EPA will 1n 1982 continue
to redirect program management to achieve  results-oriented objectives in  several
high priority  program  areas,   Including  municipal  waste  treatment  facilities
performance.  The  States and  EPA will  emphasize the  following: integration  of
operations and management  considerations in planning, design,  and  construction;
project affordability  reviews  (including  use  of  innovative   and  alternative
technologies); project completions,  audit resolution, and  closeout;  eliminating
waste, fraud, and  abuse; accelerating  the rate and level  of State program dele-
gations; and meeting grants obligation and outlay projections.

     Working with the Corps of  Engineers,  EPA will  increase efforts to eliminate
project completion, audit resolution and project closeout backlogs and to prevent
and eliminate waste,  fraud,  and abuse  in  the program.   EPA will monitor Regional
and State management  results in each of the priority areas, negotiate 1983 priority
and output agreements with  States,  and  provide  management assistance  wherever
appropriate.   Each delegated  State  is expected to  establish in 1982  an  ongoing
program management process to ensure results in each  priority area.

1983 Program Request

     At a proposed 1983 construction grants  appropriation  of $2,400,000,000, EPA
expects to award approximately 661  grants totaling $2,400,000,000.   Including the
1,250 projects expected  to  be completed and brought  into  operation in 1983, 65%
of all Step 3/2+3 awards will have been completed.  These funds  will also support
construction grants management  activities  in 46 delegated States  with estimated
obligations of $85,909,000,  and water  quality  managment planning  activities  in
the States with estimated obligations of up to $24,400,000.

     EPA does not  assume any  additional  States  will  accept initial  delegation
of responsibility  in  1983,   However,  25 currently delegated States are expected
to assume full delegation,  an increase of  11  over 1982.  With the exception  of
statutory responsibilities  for  project  management  In  nondelegated   States and
Territories and  in  partially  delegated   States,  EPA  in   1983  will  primarily
exercise the role of overall program manager.

    The Agency will  work with delegated States  to define annual national  program
priorities and objectives,  monitor  delegated State programs, and  provide needed
management  assistance.  The  Federal program   will    emphasize results-oriented
oversight of  a  limited  number  of  high  priority  program activities  where there
are direct financial,  water quality, or  public  health concerns.   EPA  will  work
to ensure that  funded projects meet  identified water quality  and public health
needs; projects  are  affordable to  the  populations served;  completed facilities
                                     CG-4

-------
are operated  and maintained  effectively  to  meet  design and  effluent  permit
requirements; facilities  are  completed,  closed  out,  and brought  on  line  as
quickly as possible; and that  waste, fraud, and abuse in the program are prevented
and eliminated.
                                      CG-5

-------
Page Intentionally Blank

-------
Superfund
   SECTION TAB

-------
Page Intentionally Blank

-------
                                                     ACTUAL
                                                      1981
                                                              SUPERFUND
                                              JANUARY
                                              ESTIMATE
                                                1982
                         MARCH     CURRENT   ESTIMATE INCREASE +
                        ESTIMATE   ESTIMATE    1983   DECREASE -
                          1982       1982            1983 VS 1982
                 APPROPRIATION
                                                              (DOLLARS IN THOUSANDS)
-n
 Hazardous Substance Response
 Trust Fund

TOTAL, Superfund

PERMANENT FULL-TIME WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS

PROGRAM HIGHLIGHTS
                 Hazardous Substance
                 Response Actions
                  Hazardous Substance Response
                  Trust Fund

                 Assessing A Replacing
                 Natural Resources
                  Hazardous Substance Response
                  Trust Fund

                 Operations Support
                  Hazardous Substance Response
                  Trust Fund
                                                  $40,283.1 $250,000.0 $200,000.0 $190,000.0 $230,000.0 $40,000.0
$40,283.1 $250,000.0 $200,000.0 $190,000.0 $230,000.0 $40,000.0

     67.3      635.0      503.0      503.0      516.4      13.4
     75.3      730.0      584.0      584.0      592.2       8.2
 $8,038.7 $164,000.0  $84,000.0 $117,743.0 $188,000.0 $70,257.0
 By virtue of Appropriation Act, as authorized by Public Law 96-510.
                                           $206,000.0




                                             $7,850.0



                                            $36,150.0

-------
                                             SLIPERFUND
                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                     1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE -
                                                1982       1982       1982            19B3 VS 1982
                                             (DOLLARS IN THOUSANDS)
 Hazardous Substance Response              $250,000.0
 Trust Fund

Hazardous Substance
Non-Energy
 Hazardous Substance Response     $4*740.5
 Trust Fund

 Hazardous Substance Response     $4,740.5
 Trust Fund
RESEARCH I DEVELOPMENT    TOTAL   $4.740.5

Super fund Enforcement
 Hazardous Substance Response     $2,457.1
 Trust Fund

 Hazardous Substance Response     $2,457.1
 Trust Fund
ENFORCEMENT               TOTAL   $2,457.1

Management And Support
Superfund
 Hazardous Substance Response     $2,323.9
 Trust Fund

 Hazardous Substance Response     $2,323.9
 Trust Fund
MANAGEMENT 8 SUPPORT      TOTAL   $2,323.9
$15,460.0  $13,877.1   $6,336.0  -$7,541.1


$15,460.0  $13,877.1   $6,336.0  -$7,541.1

$15,460.0  $13,877.1   $6,336.0  -$7,541.1
$15,210.0  $14,345.3  $15,328.5
$983.2
$15,210.0  $14,345.3  $15,328.5     $983.2

$15,210.0  $14,345.3  $15,328.5     $983.2



$29,150,0  $24,287.8  $15,326.0  -$8,961.8


$29,150.0  $24,287.8  $15,326.0  -$8.961,8

$29,150.0  $24,287.8  $15,326.0  -$8,961.8

-------
Ln
TI

CO
                                                      ACTUAL
                                                       1981
                                                               SUPERFUND
                                              JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                              ESTIMATE   ESTIMATE   ESTIMATE   ' 1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
                  Hazardous Substance
                  Response Actions
                   Hazardous Substance Response    $24,018.7
                   Trust Fund
USC6 011 Pollution
Fund
 Hazardous Substance Response
 Trust Fund

Interagency Support
 Hazardous Substance Response
 Trust Fund
                                                    $6.742.9
                                                   $30,761.6
 Hazardous Substance Response
 Trust Fund
HAZARDOUS SUBSTANCE
RESPONSE ACTIONS          TOTAL  $30,761.6

TOTAL PERMANENT HORKYEARS
                                                               (DOLLARS IN THOUSANDS)
                                                      $140,180.0 $137,489.8 $185,737.7  $48,247.9
                                                                                                $7,271.8  $7,271.8
             $ $140,180.0 $137,489,8 $193,009.5 $55,519.7
                                                                      $ $140,180.0 $137,489.8 $193,009.5 $55,519.7
                  Hazardous Substance
                  Response Actions

                  Operations Support

                  Hazardous Substance
                  Non-Energy
                  RESEARCH * DEVELOPMENT
                          TOTAL
2.5

2.5
                                                465.0


                                                170.0
39.0

39.0
30.0

30.0
24.5

24.5
-5.5

-5.5

-------
SUPERFUND

Superfund Enforcement
ENFORCEMENT TOTAL
Management And Support
Superfund
MANAGEMENT « SUPPORT TOTAL
Hazardous Substance
._ Response Actions
71 HAZARDOUS SUBSTANCE
*• RESPONSE ACTIONS TOTAL
TOTAL HORKYEARS
Hazardous Substance
Response Actions
Operations Support
Hazardous Substance
Non-Energy
RESEARCH S DEVELOPMENT TOTAL
Superfund Enforcement
ENFORCEMENT TOTAL
Management And Support
MANAGEMENT S SUPPORT TOTAL
ACTUAL JANUARY
1981 ESTIMATE
1982
22.6
22.6
3.0
3.0
39.2
39.2
560.0
170,0
3.2
3.2
24.3
24.3
3.7
3.7
MARCH
ESTIMATE
1982
162.0
162.0
80.0
80.0
222.0
222.0


39.0
39.0
188.0
188.0
95.0 '
95.0
CURRENT
ESTIMATE
1982
162.0
162.0
89.0
89.0
222.0
222.0


30.0
30.0
188.0
188.0
104.0
104.0
ESTIMATE INCREASE
1963 DECREASE •
1983 VS 191
165.9
165.9
81.9
81.9-
244.1
244.1


24.5
24.5
190.2
190.2
90.6
90.6
3.9
3.9
-7.1
-7.1
22.1
22.1


-5.5
-5.5
2.2
2.2
-13.4
-13.4

-------
                                             SUPERFUND
                                    ACTUAL    JANUARY      MARCH     CURRENT   ESTIMATE INCREASE +
                                     1981      ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                1982       1982       1982            1983 VS 1982
Hazardous Substance                   44.1                  262.0      262.0      286.9      24.9
Response Actions
HAZARDOUS SUBSTANCE
RESPONSE ACTIONS          TOTAL       44.1                  262.0      262.0      286.9      24.9

-------
                                  SUPERFUND


OVERVIEW AMD STRATEGY

     In 1983, the major  emphasis  of the Superfund  program will be on  the field
implementation of the  Comprehensive  Environmental   Response,  Compensation,  and
Liability Act (CERCLA).  This act, which was  enacted by the Congress  in December
1980, established for  the  first time a  broad based and  integrated program,  In-
volving both  Federal  and State governments,  to address  the  environmental  prob-
lems posed by uncontrolled hazardous waste  sites and spills of hazardous materi-
als.  The  primary  provision  of the  Act  Itself  Involves  the establishment  of
the Hazardous Substance  Response Trust  Fund.   This  fund, which 1s financed  by  a
combination of excise  taxes  levied  on oil  and  chemical  manufacturers  and reven-
ues from the  General  Fund,  provides  funding  over  five years  to  carry  out  the
provisions of CERCLA.

     The primary goal  of the  Environmental  Protection  Agency's Superfund program
is to establish  mechanisms  for effective  response  to  the  release or  threatened
release of  hazardous  substances,  pollutants,  or  contaminants  that  present  an
imminent or  substantial  endangerment  to public health,  welfare or the  environ-
ment.  The two  basic types  of  actions  involved In  this process are  removal  and
remedial actions.  Removal  actions  are  generally  short-term  responses  taken  to
abate an Immediate  threat  posed by  the uncontrolled  release of  hazardous  sub-
stances at both  sites  and  spills  in all media.  Remedial  actions  involve longer
term and more complex  solutions at hazardous  waste  sites.  In addition,  remedial
actions are  generally more   expensive  than  those   Involving  removal   measures.

     While EPA  has  the primary responsibility  for  Implementing the  removal  and
remedial portions of the program,  the Act provides  a clear mandate for the Agency
to work closely  with a variety  of  other Federal agencies and the States In order
to carry out  the Act.   The National  Contingency  Plan provides the basic frame-
work for implementing the program in a timely and effective fashion.

     The Environmental  Protection  Agency,  1n  recognizing  the  complexity  of
the Superfund program, will  draw  upon  a  wide variety of  expertise  throughout
the Agency and  will  continue to  move  forward 1n  1983  with a fully  Integrated
effort involving five  major functions.   These  functions  are  Hazardous  Substance
Response, Enforcement, Research  and Development,  Management  Support,  and Inter-
agency support.  The effective integration  of these  functions will Involve close
cooperation among various  EPA  offices   with  specific program responsibilities-

     In 1983, the  Hazardous  Substance  Response activities will  be  focused  on
the containment  and  cleanup  of the most serious hazardous  waste  emergencies and
the continuation and Initiation of remedial  actions at  uncontrolled  sites pos-
ing the  greatest threat to  public health  and the  environment.   This  phase  of
the response  program will require continued participation by the States.  To this
end, the Agency  will  continue to develop  cooperative agreements and  contracts
with States  that are able  and willing  to  carry out any  or all of the  remedial
response actions authorized by  CERCLA.   While the Federal  government  will retain
the power  to determine  when  a  remedial  response   action  Is warranted,  States
will be strongly encouraged to assume full  responsibility for the  actual  on site
cleanup actions.  Initial work at a large number of  sites has already been initi-
ated by either  EPA  or the  United States Coast  Guard,  in areas where  it has geo-
graphical jurisdiction, States, and responsible private parties.  Currently, over
10,000 sites  have been identified;  over 2,000  preliminary  assessments  have been
undertaken; and  1,200  on-site inspections have  been  completed.

     The highest priority  for  the Hazardous  Substance  Response function  will
continue to   be  effective  response  to major hazardous   substance  spills  and
releases at  hazardous  waste  sites.  The Federal  government can  only  respond to
the worst  of these  Incidents.  Maintenance of it's  response capabilities, there-
                                       SF-6

-------
fore, requires  close  coordination  between  various  Federal   agencies  and  the
States.  In  many  cases,  the  parties  responsible  for the  incident are  either
unknown or  incapable of  responding  in a  timely  fashion.   In  addition,  approp-
riate State  and local  entities  are  often  unable to  respond adequately,  thus
leaving the  Federal   government  with  the  responsibility  for   responding  to  the
immediate threat posed by these incidents.

     In addition  to  emergency response  actions,  hazardous  substance  response
activities will continue  to  be focused on  remedial actions at  uncontrolled sites
posing the  greatest  threat to  public health  and the environment.   The Agency,  in
October 1981,  published  an  Interim  Priority  List   of  the  115  most  serious
sites based  on relative  risk  to  public health  or the  environment.  Activities
required to  be completed before  actual remedial  work can begin  at a particular"
site include site inspections  and preliminary assessments to determine If further
action is required,  feasibility studies to assess the relative merits of various
remedial measures, and the actual  design of the measure that Is finally selected.
These initial  site investigation and planning activities require significant lead
time to  complete,  but are  not particularly resource intensive when compared to
total site  response  costs.   The  1983  program  will still  be heavily involved in
the completion  of  these  preparatory  activities.   While the resources  requested
for 1983 are less than the projected revenues available in the Hazardous Substance
Response Trust Fund, the request is sufficient  to support the  program  at this
stage of its Implementation.   Implementation of the selected remedial alternative
will be undertaken  at a total  of 11 sites on  the Interim Priority List 1n 1983.

     Superfund research  and  development activities  support  the Office of Emer-
gency and Remedial Response, Regional  Offices, States, and industry by resolving
those problems  which inhibit the effective  implementation of  removal  and remed-

-------
nology and  other information  and adapting  it to  uncontrolled hazardous  waste
site situations.

     Resources in the Hazardous Substance Response Trust Fund  will  be Inadequate
to support direct cleanup actions at all sites requiring response.   Congress,  in
recognizing this  fact,  provided the  Federal  government with  the  capability  to
identify and,  where  possible,  either  compel  cleanup  by  private  responsible
parties in  lieu  of  Federal  response  actions  or  recover Federal  expenditures
incurred through  cleanup  actions  when  the  responsible party  or parties  decline
to respond.

     The Superfund enforcement  program  builds upon actions taken  against uncon-
trolled hazardous waste  sites under the  Resource  Conservation and  Recovery  Act
(RCRA).  these actions are  designed  not only  to  compel private parties to assume
responsibility for their actions  that have  resulted in an imminent and substan-
tial danger to  public  health or the environment,  but also to preserve Fund  re-
sources so  that  the  greatest  number  of  sites  can  eventually  be  addressed.

     EPA will continue to  coordinate the activities  of Its technical  and legal
enforcement personnel  with   those  of Department  of Justice  staff  In order  to
arrive at decisions  on the most appropriate enforcement strategies to undertake
at particular incidents.  The result of  this approach  will  be  the early Identifi-
cation and resolution of Issues as the case  evolves.

     In addition, the National Enforcement investigations Center (NEIC) in Denver
provides specialized assistance to the Agency's enforcement efforts. NEIC  efforts
are concentrated  on  such activities as specialized investigatory  assistance  and
development of procedures for use  In analyzing -field  samples that are especially
hazardous.

     In summary,  enforcement efforts in 1983 will  continue to  be a major  compon-
ent of the Agency's  overall  Superfund strategy.   These efforts will  continue  to
be Integrated  with  hazardous  substance  response  and  research and  development
activities.  This will assure that the most  effective  methods  are used to  Identi-
fy and  address,  either through cleanup by  appropriate governmental  entities  or
responsible parties, problems resulting from the uncontrolled  release of  hazard-
ous substances.

     Management and  support activities  for  the Superfund  program  are focused  on
providing a  fully  integrated  system  of  financial and  administrative  support
services.  These  activities  are  directed  toward  ensuring that  the  required level
of services  is  provided to  the program  In  a  timely and efficient  fashion.   The
five major activities  contained In the management  support function are adminis-
trative services, financial management,  policy and resource management, .Inspector
General, and General Counsel.

     Administrative services  provide the centralized  support for  the Superfund
program.  These  services  include  personnel management,   contracts  negotiations
and administration, data systems management,  and  occupational  health and  safety.
Also included In  this  are  funds for  facility  rental,  Federal  Telecommunications
Service, utilities, local telephone costs, and other support costs.

     Financial management  activities  provide  for  the  development  of systems  to
maintain financial  records  that  accurately !reflect the  financial  condition  of
the Fund and provide full accounting of all  receipts and disbursements.

     Policy and  resource  management activities  support  program  implementation
through:  statistical, technical, economic and financial analyses of regulations,
guidelines, policies  and program  activities;  the  development  and implementation
                                       SF-8

-------
of management tracking and  accountability  systems; and budget preparation,  con-
trol, execution and evaluation.

     The Agency's  Office  of General  Counsel  supports  the  Superfund program  by
providing advice and  consultation  on  financial  and administrative matters  such
as eligible uses of the  Fund  and  legal  support for the development  and  defense
of regulations.  The  General  Counsel  also provides advice  to  Superfund managers
and States in  such matters  as cooperative  agreements  for State agencies  to ad-
minister the Superfund program for removal or  remedial  work, and  for  defensive
litigation arising out of Regional  Superfund decisions.

     The Agency's  Office  of  Inspector General  1s  responsible  for  determining
whether or not  the Fund is being properly administered;  preparing  interim and
final Reports  to  the  Congress;   and   conducting,  supervising  and  coordinating
preaward, interim,   and final  audits  of  Superfund  contracts  and  interagency
agreements.

     In addition to requiring  integration of  the efforts  of  the  various  EPA
offices with program responsibilities, the  Superfund program will  require close
cooperation among various Federal  agencies  if the objectives of the  program are
to be achieved.

     In order to achieve this  goal,  Executive Order 12316,  signed  by the Presi-
dent in  August 1981,  requires that EPA  assume  responsibility  for  the  manage-
ment of  an interagency  budget process  for  1983  to provide  the   necessary  re-
sources for effective  support of  field  operations by  other Federal  agencies.
In accordance with  the  need to provide  support for other  agencies'  activities,
funds will be  provided  In  1983 to  several  Federal agencies.  These  Include the
Departments of Justice, Health and Human  Services, Transportation  ana  Commerce.-
These resources support their ongoing activities, as defined in either the Super-
fund legislation,  the National Contingency Plan, or Executive Order  12316.   EPA
has also been exploring alternatives that will take advantage of  the construction
management expertise  of the Army  Corps of Engineers  while  still  relying  on the
private sector to perform all  actual design and  remedial  construction work.   EPA
intends to fund other agencies' site specific activities, Including any performed
by the Corps, through the use of Interagency agreements.
                                        SF-9

-------
                                  SUPERFUND


SUMMARY OFINCREASES AMD DECREASES

                                                       (in thousands of dollars)

     1982 Superfund Program	„	„         $190,000.0

        Hazardous Substance Response Trust Fund..,. .„„,          440,000.0

        The net Increase of $40,000.0 1s a result of  In-
        creased response activities at hazardous waste
        sites and  spills.   The  Increase  of  555,519.7
        for Hazardous Emergency Response  Activities  and
        Interagency Support provide for Increased con-
        tract funds for field response, laboratory anal-
        ysis and  support  for  other  Agencies  with  re-
        sponsibilities under the Comprehensive Environ-
        mental Response Compensation and  Liability  Act
        (CERCLA).  This 1s offset by  decreases  in pro-
        gram support activities and research and devel-
        opment.

     1983 Superfund Program	         $230,000.0


SUMMARY OF CHANGESi TO JANUARY 1982 BUDGET ESTIMATE

                                                      {In thousands of dollars)

     January 1982 Estimate	         $250,000.0

        January-March.	....	          -50,000.0

        Restructurl ngs	„	                -0~

        Three program elements  were  restructured into
        twenty-three program elements  with  no  change
        to the total program.

        Congressional  Actions	          -10,000.0

        A reduction of  $10,000,000  was applied  to  the
        Hazardous Substance Response Trust  Fund  appro-
        priation to meet Congressionally  mandated
        appropriation levels.

     Current 1982 Estimate	         $190,000.0
                                        SF-10

-------
                                        SUPERFUND


                                           Budget      Current              Increase +
                                Actual  *  Estimate   Estimate   Estimated   Decrease -
Program Activities               1981        1982       1982        1983      1982 vs 1983

  Hazardous Substance Spills-
    Immediate Removal Actions       3         205        30          50       +20

  Hazardous Substance Sites-
    Immediate Removal Actions      30          50        45          30             15

  Hazardous Substance Sites-
    Planned Removal Actions         -          18        15          30       +     15

Remedial Acti ons

  Preliminary Assessments       1,650      10,000     8,000       2,000       -  6,000

  Inspections                   1,200         900     1,500         500       -  1,000

  Investigations                  120         300       300         100       -   200

  Full-Field Investigations/
    Feasibility Studies            23          65        42          56       +14

  Designs                          11          40        10,         20       +     10

  Undertake Remedy                  1           8         7          11+4

Assessing and Replgel ng NaturalResources

  Damage Assessment
    Notifications                   -          11         4           2-2

  Reviews of Damage
    Assessments                     -          11         4           2-2

  Restorations                      -           2         1           1-1
* 1981 figures Include actions taken under the Uncontrolled Hazardous Waste Sites
  Program as well as from 1981 Hazardous Substance Repsonse Trust Fund resources.
                                       SF-11

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                              SUPERFUMD

                                                    Hazardous  Substance Non-Energy

                                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE t
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                 1982        1982       1982            1983 VS 1982
                PROGRAM
                                                              (DOLLARS  IN THOUSANDS)
CO
Tl
I
Scientific
Assessment
 Hazardous Substance Response        $107.1
 Trust Fund

Monitoring Systems 4
Quality Assurance
 Hazardous Substance Response      $1,339.9
 trust Fund

Environmental Engineering
ATechnology
 Hazardous Substance Response      $3,198.7
 Trust Fund

Environmental
Processes 8 Effects
 Hazardous Substance Response         $94.8
 trust Fund
                                                                          $424.0     $407.7     $614.2    $206.5
                                                                        $2,865.0   $2,658.2   $1,989.9   -$668.3
                                                                       $11,150.0   $9,834.7   $3,499.4 -$6,335.3
                                                                        $1-.021.0     $976.5     $232.5   -$744.0
               TOTAL:
                Hazardous  Substance Response
                Trust Fund
               Hazardous Substance
               Non-Energy
                        TOTAL
$4,740.5


$4,740.5
                                                        $15,460.0  $13,877.1    $6,336.0  -$7,541.1
$15,460.0  $13,877.1   $6,336.0 -$7,541.1

-------
                                              SUPERFUMD

                                    Hazardous Substance Non-Energy

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE -
                                                 1982       1982       1982            1983 VS  1982



trt
-n
i
10




PERMANENT FULL-TIME WORKYEARS
Scientific Assessment
Monitoring Systems 8 .9
Quality Assurance
Environmental Engineering 1.6
8 Technology
Environmental
Processes 4 Effects
TOTAL PERMANENT HORKYEARS 2.5
TOTAL HORKYEARS
Scientific Assessment
Monitoring Systems 8 .9

5.0 3.8 2.5 -1.3
12.0 9.2 8.4 -.8
17.5 12.5 11.5 -1.0
4.5 4.5 2.1 -2.4
39.0 30.0 24.5 -5.5

5.0 3.8 2.5 -1.3
12.0 9.2 8.4 -.8
Quality Assurance

-------
I
"j*
                                                              SUPERFUMD

                                                    Hazardous Substance Non-Energy

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                 1982       1982       1982            1983 VS 1982
Environmental Engineering 2.3
8 Technology
Environmental
Processes & Effects
TOTAL WORKYEARS 3.2
17 .5

4.5

39.0
12.5

4.5

30.0
11.5

2,1

24.5
-1.0

-2,4

-5.5

-------
                                  SUPERFUMD

                         Hazardous Substance Non-Energy

Budget Request

     the Agency requests  a total  of $6,336,000 and 24.5  permanent worfcyears  for
1983, a decrease  of $7,541,100 and 5.5 permanent mrkyears from  1982.   This  de-
crease represents  the completion of  several  engineering and  environmental pro-
cesses projects  required  to  support  Initial  Superfund  Implementation  efforts.

ProgramDescription

     Superfund research and  development activities are designed  to  support  the
Office of Emergency and Remedial  Response,  Regional Offices,  States and Industry
by resolving those problems which inhibit the effective and efficient Implementa-
tion of removal and  remedial  actions.   For Instance,  many existing technologies,
such as those used  in the construction  Industry,  wastewater treatment,  and  spill
cleanup, may be  applicable to uncontrolled  waste sites.  However, before  these
technologies can be applied, they must first be tested, their  cost and effective-
ness determined, and limitations understood.  Similarly, field response  personnel
must be  in  a position to  rapidly identify and accurately measure the  hazardous
wastes they are confronted with, as well  as  be in a   position to  rapidly assess
the risks involved to the surrounding population and ecosystems.

     Because of these and  other potential operational problems, Superfund research
and development  activities are  systematically designed  to meet  the  short-term
objectives of:

     -  Providing the necessary tools and  methods  for sampling analyses,  labora-
        tory analyses, quality  assurance  and  remote  monitoring  to discover  and
        characterize hazardous wastes from removal and remedial actions;

     -  Providing the necessary tools  to  field response personnel to  determine
        the potential  ecological  effects  of  hazardous  substance  spills  and
        releases from uncontrolled waste sites;

     -  Providing evaluations  of the hazard  potential from substances released
        from spills and uncontrolled waste sites;  and

     -  Providing  engineering  guidance  to Federal,  State and  local  officials
        in the  Immediate   response  to  spills  of  hazardous   substances;  field
        evaluations of  equipment  and  technologies  for  on-slte  treatment  and
        destruction of hazardous wastes, leachates and contaminated groundwater;
        evaluating and assessing the most cost-effective technologies for perform-
        ing remedial actions at uncontrolled sites.

     Because Superfund is  also  legislatively designated a 5-year program, emphasis
Is not being placed on research  per  se,  but on taking "off-the-shelf" technology
and other  Information and adapting  it  to  uncontrolled hazardous  waste  site
situations.

SCIENTIFIC ASSESSMENT

1981 Accompl 1 shtnents

     In 1981, the Agency obligated a total  of $107,100 and no  permanent  workyears
for this program, all of  which was  funded  under the Hazardous  Substance Response
Trust Fund.

     This program provided  a  capability to evaluate  and otherwise  identify  the
type and degree  of  health hazards associated  with  uncontrolled  waste  sites  and
disposal options.  Health  hazard  expertise was applied to the Agency's revision
                                       SF-15

-------
of the  National  Contingency  Plan.   The  majority of  outputs  In  1981  Involved
providing documentation  and  justification  to the  Agency  of the  existence  of
health hazards  from  a toxlcity and  exposure perspective 1n  several  enforcement
and other site specific situations.

1982 Explanation of Changes from JanuaryBudget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                        ...          $424,000        5407,700

     The net  Increase of  +5407,700 results  from several  actions,  as  follows:

     -  Restructuring.   (+5424,000)   With  the restructuring  of Hazardous  Sub-
     stance Response, this program element was created.

     - Reprogramnring.  (-516,300)  During  the  development of the operating  plan,
     several miscel 1 aneous  reprogramnrings, which are not reportable  to  Congress,
     were made  to,  this  activity  and  resulted  In  net decrease  of  -516,300.

1982 Program

     In 1982, the Agency is alloting a  total  of 5407,700 and 3.8 permanent  work-
years to this  program,  all  of  which   is  funded  under  the Hazardous  Substance
Response Trust Fund.

     This program will continue  to  provide an array of  health  hazard,  toxiclty,
and exposure Information to headquarters and  Regional  office activities assoc-
iated with  chemical  and  site  specific  uncontrolled  waste  site problems.   Since
Information on the type  and degree  of likely health hazards Is very basic  know-
ledge to many   Superfund initiatives,   the following  services and  outputs  are
being produced:  health  sunmaries  and  criteria  for minimum reportable  quanti-
ties of  spilled substances;  health  profiles  for  preliminary  site  evaluations;
full health  and risk  assessments with  exposure  data  for  high  priority  waste
sites and  preparation of  a  comprehensive health  assessment methodology  which
identifies  the myriad  of existing procedures that should be employed and princi-
ples that  should be followed  when assessing  the  hazards of  uncontrolled  sites.

1983 Program Request

     The Agency  requests a  total  of $614,200 and  2.5  permanent  workyears  for
this program,  all  of  which is funded  under  the Hazardous Substances  Response
Trust Fund.  This  reflects an  Increase of $206,500 and a  decrease of  1.3 per-
manent workyears, which  will  Increase the  nunber of risk  assessments  completed
though extramural efforts.

     This program will  continue  to  support the Agency's statutory  requirements
by providing  evaluations of  the hazard  potential  of  substances  released  from
spills and uncontrolled waste sites.  This objective will be achieved by providing
information on the acute and  chronic toxlcities of identified  compounds in  order
to select the best  safety measures for  protection of cleanup crews  as veil  as to
determine acceptable residual levels (extent of cleanup).

     More specifically, the Agency will  Increase  its anphasis in this program by
providing an  array  of health hazard assessment  expertise  and documentation  to
support the Agency's need to prioritize and document hazard potentials at various
uncontrolled sites.  Health summaries will be prepared to support Agency criteria
for minimum  reportable quantities;  health  profiles  will be provided to aid  In
the preliminary  evaluation  of  uncontrolled  sites;  and  comprehensive health
hazard and  risk assessments  will  be prepared to address  the need  for in-depth
health hazard Information for pre- and post-remedial  .situations.  The preparation
                                       SF-16

-------
of a comprehensive health assessment methodology begun in 1982 will  be  completed
and made available for Agency use.

     Although the  Agency uses  health  assessments  for  predictive  purposes, the
assessments will also  be useful  1n  helping the Department  of Health  and  Human
Services conduct  clinical   Investigations  to  verify the  existence  of  adverse
human Impacts as required under the Superfund provisions.

MONTI PRIMS . SYSTEMS AND QUALITY ASSURANCE

1981 Accomplishments

     In 1981, the Agency  obligated a total  of $1,339,900 and .9 permanent workyears
for this program, all  of which  was  funded  under the Hazardous  Substance Response
Trust Fund.

     -  A comprehensive  quality assurance  program  has been  Initiated to evaluate
        contractors involved 1n the site program.

     -  In an effort  to  meet the demand for an Agency  capability, a contractor
        operated laboratory   1s  being  established  to  standardize  sampling and
        analysis procedures  of field samples  and complex samples taken by Regional
        field teams.

     •  A  comprehensive  program to monitor  air quality  1n  and around  sites has
        been started.   The task Includes the development  of a personal  exposure
        monitor for volatile organic*.

     -  An extensive  nationwide  program  has been  Instituted  to acquire  aerial
        photos of sites, characterize  the problems  and prioritize  the  need for
        cleanup.

1982 Expl anatipn of Changes  from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                    $2,865,000      $2,658,200

     The net increase  of +$2,658,200 results  front several  actions, as  follows:

     "  Restructurlnp.   (+$2,865,000)   With  the restructuring  of Hazardous  Sub-
     stance Response,  this program element was created.

     -  Reprograinmlng.  (-$107,800)  During the development of the operating  plan,
     several  ml seel laneous reprogramnrlngs,  which are not  repor table to  Congress,
     were made  to  this  activity  and   resulted  in  net  decrease  of -$107,800.
                      Act1 pus . (-$99,000)   A reduction  of  -$99,000 was  applied
     to the  Hazardous  Substance  Response  Trust  Fund  appropriation   to  meet
     Congressional ly mandated appropriation levels.

1982 Program

     In 1982, the Agency  1s allot Ing a .total  of  $2,658,200 and 9.2  permanent
workyears to this program, all of which  Is funded  under  the  Hazardous  Substance
Response Trust Fund.

     In 1982, efforts will continue to:

     -  Maintain a quality assurance program;

     -  Evaluate and standardize  sampling and analysis methods;
                                      SF-17

-------
     -  Provide  oversight for  a  contractor  operated laboratory  which  analyzes
        field samples  of complex  samples taken  from Regional  and State  field
        response teams;

     -  Provide technical guidance, support and overview to the Mandatory Quality
        Assurance Program;

     -  Develop a personal exposure monitor for volatile organlcs;

     -  Characterize the  problems and  prioritize  the need  for cleanup  through
        aerial photography of sites;

     -  Support the  program  office, Regions and States  with special  studies  of
        air, surface, groundwater and site characterization.

1983 Program Request

     The Agency requests  a total   of  $1,989,900 and 8.4 permanent  workyears  for
this program,  all  of  which  Is  funded  under  the  Hazardous Substance  Response
Trust Fund.   This  reflects a  decrease of $668,300,  and .8 permanent  workyears
resulting 1n a reduction 1n efforts to provide  oversight for a contractor operated
laboratory.  The reduction In  this activity reflects the completion of  projects
required to support Initial Superfund Implementation efforts.

     The major objective  of  this  program 1n 1983 will be to continue  supporting
our program Implementation requirements and State assistance  objectives  by provi-
ding government agencies  (Federal,  State and  local) with  the latest  research
methods and techniques  in measurement,  monitoring,  and  quality assurance.   The
program wll 1  meet  the monitoring  requirements of  removal  and  ranedlal  actions
mandated by the Act.   The tools and methods for field support and sampling, labor-
atory analyses, and  remote  monitoring  will  be applied  to  site discovery  and
characterization,  as  veil  as  mitigation and cleanup.   The  program  Includes
quality assurance through laboratory audits and 1 ntercomparlson analyses.

     In a systematic way the  program will:

     -  Provide quality assurance  for contractor and Regional  laboratories Involv-
        ed in remedial  actions.  This task will Include on-site laboratory evalu-
        ations and data audits from those laboratories.

     -  Continue to provide oversight capability for  a contractor-operated labo-
        ratory to standardize sampling and analysis procedures of complex samples
        taken from removal and  remedial  sites.  This task Includes the  analyses
        of split  samples  and  actions  as a  referee laboratory  in  the event  of
        analysis problems.

     -  Apply methods  and protocols  for sampling  and  analysis of wastes  taken
        from uncontrolled sites.

     -  Analyze historical and  new  aerial  photography to determine  the extent  of
        problems,  characterize site conditions and provide data for site prloritl-
        zatlon.

     -  Field  test  and  evaluate  personal  exposure monitors  and equipment  for
        volatile organics.

     -  Provide state-of-art  equipment and scientific expertise to the operational
        programs Involving remote  and contact sensing for air, water, groundwater,
        soils and biota.  This  Includes  provision of  expert  witness capabilities
        and case preparation  support  for enforcement  actions for maintaining  the
        Integrity of the fund.
                                      SF-18

-------
ENVIROKMEMTAL ENGIMEERJMG AND TECHNOLOGY

1981 Accomplishments

     In 1981, the Agency obligated  a total  of $3,198,700 and 1.6 permanent work-
years for  this  program, all  of which was  funded under the  Hazardous  Substance
Response Trust Fund.

     RCTOM!/jinerggncy'Response Program.  Preparation  of  manuals  and  guidance
documents^for^ule by  EPA ana state response personnel and the  private  user com-
munity 1s  a major  element  of this  program.   As of  this  time, no  manuals have
been released to the  public.   Several  documents, however, were  prepared  for the
Emergency Response  Division,  Office of  Emergency and Remedial  Response  (OERR),
for Internal use.

Additional  support  has Included:

     -  Development of  a decision guide addressing removal  and remedial  Issues,
        providing guidance to on-scene coordinators to distinguish between  "remov-
        al " situations and "remedial" situations.

     .  Development of  guidance  on practical  termination  points  for cleanup,
        utilizing primarily engineering parameters for the decision.

     Remedial Action Program.  A  survey  and assessment  of current  technologies
being used  at  uncontrolled hazardous waste  sites was conducted.  This Involved
field evaluations of  specific techniques  to determine their cost-effectiveness
1n reducing pollutants emitted  from uncontrolled  waste sites.  Many  of the tech-
niques ara those used for  other purposes,  such  as the construction Industry, and
have never been field  tested at uncontrolled sites.  This  program activity  attemp-
ted to utilize Information available from remedial actions already completed, and
to project  the  applicability  of techniques used  In other  situations.   Completed
efforts Include:

     -  An  evaluation  of  remedial  actions  completed prior to  Implementation
        of Superfund;

     -  A manual of techniques applicable to remedial  sites;

    . -  A cost evaluation of remedial  techniques.

     Site design analyses and  field  verification of  techniques  were also  Initi-
ated.  Because technologies already developed for other uses  require  field  verif-
ication before  they can be  adapted to  uncontrolled  waste  sites,  OERR and  the
States are  reluctant  to  specify use  of a technology for a site unless  they have
some field  verification  that the method will  work.   A  second major  thrust  of
this program 1s  site  design analysis.   This  analysis entails two steps;  first,
an assessment of the site in terms of the receptors  of the releases,  the pathways
of the releases, and  the waste characteristics  Is  conducted.  Then the  various
techniques available  for remedial  action  are analytically  superimposed  on  the
site.  Cost, cost-effectiveness,  and  reliability of  the Individual  techniques
and systems  are  then  factored Into the  analysis and  used to determine the  best
design.  Completed  efforts Include:

     -  Development of  a  remedial   action  'handbook  for  uncontrolled  hazardous
        waste sites;

     -  An  assessment of concentration  and  treatment technologies  for leachate
        from uncontrolled hazardous  waste sites;

     -  A determination of the effectiveness  of  top sealing  to  minimize leachate
        generation;
                                      SF-19

-------
     -  Providing  technical   assistance,  analysis,  consultation and  review  of
        remedial action plans with other EPA offices.

1982 Explanation of Changesfrom January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                   $11,150,000      $9,834,700

   The net  Increase of  +$9,834,700 results  from  several  actions,  as  follows:

   "  Restructuring.   (+$11,150,000)   With the  restructuring  of Hazardous  Sub-
   stance Response, this program element was created.

   "  ReprogramBiing.   (-$420,300)  This  reprogramnring  of -$420,300 will  provide
   additional resources to  allow the Inspector General's Office to  carry out a
   more active  role In  Superfund.   Some  projects associated  with  developing
   manuals on site  safety  containment and confinement and  field  evaluations  may
   be delayed.   (This  reprogramnring  WAS Included  In  a  letter  to  Congress  on
   December 16.  1981).

   "  Congresslonal Actlons.   (-895,000)   An  additional  reduction  of-$895,000
   was applied to  the  Hazardous Substance  Response Trust Fund appropriation  to
   meet Congressional mandated appropriation levels.

1982 Program

     In 1982, the  Agency is  alloting  a total  of $9,834,700 and 12.5 permanent
workyears to this program,  all  of  which 1s -funded  under  the Hazardous Substance
Response Trust Fund.

     Removal/Emergency  Response Applications.   These activities address the high-
est priority needs  or  the  program  offices and the  Regions  relative to emergency
action at hazardous materials spills  and newly discovered releases from uncontrol-
led waste sites.

     An activity addressing emergency response control  technology 1s  being Initi-
ated.  It will  demonstrate  prototypical  equipment  for cost-effective  multimedia
removal actions   at  spills  and  defective  uncontrolled  hazardous  waste  sites.
Included In the  demonstration 1s the EPA developed mobile Incinerator  for on-s1te
destruction of hazardous organic*.  Prevention practices and  pre-response planning
procedures for  environmental  emergencies  are  being demonstrated,  and  relevant
manuals developed.

     Guidelines  are being developed to  assist Federal,  State and  local  officials
In coordinating  their  efforts to remedy uncontrolled releases of hazardous  sub-
stances.  Manuals  on  situation assessment,  containment and  confinement tech-
niques for  removal  actions are  also being prepared,   included are  specialized
equipment and procedures for ensuring personnel safety (during site reconnaissance
and cleanup), decontamination equipment  and procedures,  equipment and techniques
for controlling  the spread of contamination 1n all  media, control  of  movement of
contamination Into   the groundwater,  and  specialized  spill  control   procedures
applicable to firemen.

     Development of  separation  and  concentration  manuals that address  released
hazardous chemicals 1n  all media  1s being initiated.  Manuals which cover ultimate
disposal of collected and concentrated cleanup residuals, and restoration of  con-
taminated areas   are also  beginning.   Included  are adaptations  of  commercial
technologies for on-s1te separation  and  concentration  of released materials  from
co-collected water, soils, sediments, and air; assessments  of  new and Innovative
techniques for on-s1te  destruction  and disposal of cleanup residuals; and advanced
techniques for the  use of  specialized,  genetically engineered  microorganisms  for
                                      SF-20

-------
removing the  last  traces of  spilled  materials  from soils  and  impacted areas to
return them to pre-release conditions.

     Remedial Action Program.  These activities cover the highest priority engine-
ering and technology needs of the program offices and Regions relative to cleaning
up uncontrolled  waste sites.  They  address such problems  as  cost-effectiveness
and validation  of  remedial  action performance, waste  destruction,  and disposal.

     A survey  and  assessment of  current  technology that  may  be  applicable to
remedial actions at uncontrolled hazardous waste sites is continuing and  will  be
reported on  as information  Is  developed.   Included is  a  report  on   surveys  of
ongoing and completed  remedial action projects, a report  on updating unit opera-
tions cost data, Including cost-effectiveness for remedial actions at uncontrolled
hazardous waste sites, and a summary report on survey technologies.

     New equipment  and procedures  are  being employed to  enhance personnel safety
during remedial  response to  uncontrolled  hazardous  waste  sites.   Prevention  of
personnel contamination is a high priority  with the program  offices, as  are decon-
tamination procedures.

     Technical resource documents which describe best engineering Judgement prac-
tices for use by communities in  controlling pollutant  releases  from uncontrolled
waste dump sites are being prepared.

     Special projects  that  address  both  emergency  and   remedial  actions  are
being conducted as  technical  assistance  to the Office of Emergency and Remedial
Response.  These activities  include  assistance in  finalizing the  NCP; reviewing
closure plans  and  providing for  postclosure  monitoring  of  the  effectiveness
of remedial actions; and technical  support to development of various  regulations
such as  notification  requirements  for  releases  of  hazardous  substances  and
designation of report able quantities.

1 98^Prograiti Reque st

     The Agency requests a  total  of $3,499,400 and 11.5 permanent  workyears  for
this program all of which 1s funded  under  the  Hazardous  Substance  Response Trust
Fund.  This reflects  a decrease  of $6,335,300  and  1.0  permanent work years. This
reduction reflects the completion and near  completion of several  major engineering
studies associated with  manuals  development, survey  and  assessments of available
technology and special projects required  to support Initial  Superfund implementa-
tion efforts.

     The primary objective  of this program will  be to continue supporting Superfund
Implementation requirements by providing  engineering guidance and control  technol-
ogy evaluation to the Federal, State and local  agencies for Immediate response to
uncontrolled waste sites.  In general, this objective will  address  the construc-
tion and  field  evaluation  of  equipment  and technologies for on-slte  treatment/
destruction of  hazardous wastes,  leachates and  contaminated  groundwater,   It
will also evaluate  and assess the  best existing  remedial  control  technologies to
minimize pollutant releases from uncontrolled  hazardous waste sites, and maximize
the applicability  and  transfer  of  this   information  to  the  user   community.

     Specific activities are addressed below:
            r                                   This program will  continue  to  ad-
dress'TSe^fgKesf prYorfty needs r of ™thll" program offices and the  Regions  relative
to emergency action  at hazardous materials spills and newly  discovered  releases
of hazardous materials  from defective  waste  sites.   Proposed  activities  Include:

     -  A program will  continue  to address emergency  response control  technology
        by demonstrating  prototypical  equipment  for cost-effective  multi-media
        removal actions  at spills  and  defective uncontrolled  hazardous  waste
        sites.   Prevention practices  and  pre-response planning  procedures  for
                                       SF-21

-------
        environmental emergencies  will  be  demonstrated  and  relevant  manuals
        developed.  Major  environmental  disasters  will  require  Federal,  State
        and local  coordination.   Therefore, guidelines  for efficient  and  cost-
        effective coordination will  continue to be developed.

     -  Manuals  addressing  situation  assessment and containment  and  confinement
        techniques for removal actions will continue to be prepared.

     -  Separation and  concentration  manuals will continue  to  be prepared  which
        address released hazardous  chemicals  in  all  media.  Manuals  will  also
        continue to  be  prepared  which cover  ultimate  disposal  of  collected and
        concentrated cleanup residuals.

     Remedial Action Program.  This  program  will  continue  to  respond  to  the
highest priority  eWfTneerTng and  technology  needs  of the  program offices  and
Regions relative  to  cleaning  up problem  abandoned  waste  sites.  It  addresses
such problems as  cost-effectiveness,  validation  of  remedial  action performance,
destruction, and disposal.  Proposed activities Include:

     -  A survey  and assessment  of current technology  that  may be applicable to
        remedial actions at  uncontrolled  hazardous  waste sites will  continue to
        be reported on.

     -  Remedial action  site design  analysis, including reports on pilot  test
        facilities to  predict effectiveness  of  remedial  action  schemes,  will
        be conducted.  Under this effort reports will be developed on the predic-
        tion of  reactivity  of  construction  materials with  hazardous  wastes.

     -  Technical  resource  documents  for describing  best   engineering  judgment
        practices for use  by communities for  controlling pollutant release  from
        uncontrolled waste dump sites will continue to be prepared.

EHVIROMMENTAL_PROCESSES AND EFFECTS

1981 Accompl1shments

     In 1981, the Agency obligated  a  total  of  $94,800  and  no permanent  workyears
for this program, all of which was  funded under the Hazardous Substance Response
Trust Fund.

     Specific accomplishments included:

     -  Completion of a preliminary draft of  the Scientific Support Coordinator
        (SSC) guidance manual.  The document will provide response personnel  with
        a uniform set of procedures and duties that must be performed when clean-
        Ing up hazardous substances from inland waters.

     -  Draft  user  manuals  and  computer  software  packages are  being  completed
        for the  land and groundwater  media,  and are being  distributed for  peer
        review to  response personnel.  These products  will  be used  by response
        personnel to  assist  them   1n  assessing  the risks  posed  to  ecosystems
        and human populations from the release of hazardous substances.

1982ExplanationofChanges  fromJanuary|udgetEstimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                    $1,021,000        $976,500

     The net  increase  of  +$976,500  results   from  several  actions,  as follows:

     "  RestruCturing.   (+$1,021,000)   With the  restructuring  of Hazardous  Sub-
     stanceResponse, this program  element was created.
                                     SF-22

-------
                        (-538,500)  During the development of the operating plan,
     several n't seel laneous reprogrammlngs, which  are not reportable to Congress,
     were made  to  this  activity  and  resulted  In  net  decrease  of  -$38,500.

     -  Congressional Actions.  (-$6,000)  An  additional  reduction  of~$6,000 was
     applied to the Hazardous Substance Response Trust Fund appropriation to meet
     Congressional mandated appropriation levels.

1982 Program

     In 1982  the  Agency  Is  allotting  a  total   of $976,500  and  4.5  permanent
workyears to  this program,  all  of  which  1s  funded under  the Hazardous  Sub-
stance Response Trust Fund.

     -  Draft  user manuals and  computer software  packages are  being completed
        for the  land  and  groundwater media,  and are being distributed  for peer
        review to  response  personnel.   These products will  be used  by  response
        personnel to assist them  In  assessing the  risks  posed  to ecosystems and
        human populations from the release of hazardous substances.

     -  Efforts  are  continuing to develop user  manuals  for  surface water and
        air environmental  assessments.  These  products  will be  used  by  response
        personnel to  assist  them  1n  assessing  the human and ecological  risk
        posed by  releases  of  hazardous  substances  Into  the  air and  surface
        water environments.

1933 Program Request

     The Agency  requests  a total  of $232,500  and  2.1  permanent  workyears  for
this program,  all of  which  is funded  under the  Hazardous  Substance  Response
Trust Fund.   This reflects a  decrease  of $744,000 and  2.4  permanent workyears
resulting from  the completion  of manuals  and  computer software  packages  for
the land  and  groundwater media  used  by response personnel  in  assessing  the
risks posed at uncontrolled hazardous waste sites.

     The primary  objective  of  this program  will be   to  continue  supporting
Superfund Implementation efforts  by  providing Federal,  State and local  agencies
with assessment and evaluation procedures for determining  the potential ecological
effects from  uncontrolled  waste  sites.   A primary focus  will  be on providing
user-oriented material on situation assessment along with evaluating and  develop-
ing ecologically  sound Isolation,   removal,  restoration and  disposal  methods.

     More specifically, the primary  focus 1n 1983  will  be to  complete  the user
manuals and  computer  software  packages  for  the  air  and surface water  media
and to field  test and  evaluate  these products at actual  uncontrolled  waste sites
or emergency spill operations.
                                      SF-23

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                                                              SUPERFUHD

                                                        Superfund Enforcement

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                 1982       1902       1982            1983 VS 1982
                PROGRAM
                                                              (DOLLARS IN THOUSANDS)
Tt
Technical Support
Office of Legal «
Enforcement Counsel
 Hazardous Substance Response        $509.4
 Trust Fund

Hazardous Substance
Technical Enforcement
 Hazardous Substance Response      $1,947.7
 Trust Fund

Hazardous Substance
Legal Enforcement
 Hazardous Substance Response
 Trust Fund

TOTAL:
 Hazardous Substance Response      $2,457.1
 Trust Fund

Superfund Enforcement  TOTAL       $2,457.1
                                                                         $2,005.1   $2,005.1   $2,346,2    $341.1
                                                                        $13,204.9  $12,340.2   $9,219.7 -$3,120.5
                                                                                               $3,762.6  $3,762.6
                                                                        $15,210,0  $14,345.3  $15,328.5    $983.2
                                                                        $15,210.0  $14,345.3  $15,328.5    $983.2
                PERMANENT FULL-TIME WORKYEARS

-------
                                              SUPERFUND

                                         Super-fund Enforcement

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
Technical Support
Office of Legal 8
Enforcement Counsel

Hazardous Substance
Technical Enforcement

Hazardous Substance
Legal Enforcement

TOTAL PERMANENT HQRKYEARS
                      15.0
            15.0
22.6
22.6
147.0      147.0
            15.0
            84.9     -62.1
                                            66.0      66.0
162.0
162.0      165.9
3.9
TOTAL WORKYEARS
Technical Support
Office of Legal 8
Enforcement Counsel

Hazardous Substance
Technical Enforcement

Hazardous Substance
Legal Enforcement
24.3
                      19.0
            19.0       19.0
169.0      169.0       99.3     -69.7
                                            71.9      71.9
TOTAL NORKYEARS
24.3
188.0      188.0      190.2
                       2.2

-------
                                    SUPERFUND

                              Superfund Enforcement

Budget Request

     The Agency requests a total of $15,328,500 and 165.9 permanent workyears for
1983 from the Hazardous Substance Response Trust Fund for enforcement activities.
This represents an  increase of $983,200 and  3.9 permanent workyears  from 1982.
The increase reflects an  effort  to maximize the effectiveness of Superfund dollars
by emphasizing enforcement  activities  In 1983.   This will  require increased cost
recovery actions to  recoup  the  costs  of Federally financed removal  and  remedial
actions, and  increased  efforts  to  Induce  or  compel  privately  financed  cleanup
actions.

Program Description

     Hazardous substance response enforcement will focus on preparing the techni-
cal and legal documentation required to take actions to  Induce  or compel  privat-
ely financed cleanup by responsible parties including the issuance of demand let-
ters and administrative  orders.  In conjunction  with  the Department of  Justice
(DOJ), EPA staff will participate  in  negotiations of consent decrees  for priva-
tely financed cleanup.  The program will also provide support to DOJ during act-
ions to recover costs of Federally financed cleanup and  claims  paid by  the Haz-
ardous Substance Response Trust Fund.  In 1983,  the legal  and technical functions
of this program will be  performed under separate program elements to be  consist-
ent with the Agency's reorganization of enforcement activities.
     technical. Support - OLEC ~  This program  element  comprises  the  Superfund
porti on of the acti vi tl es of the National Enforcement Investigations Center (NEIC)
in Denver, Colorado which  is contained within the organization  of the  Office of
Legal and Enforcement  Counsel  (OLEC).   The NEIC  provides  technical  support  to
various aspects of the Superfund enforcement program, with emphasis on specialized
technical  case support for high  hazard and high priority enforcement cases as well
as national  expertise  and  specialized  services  not normally  available at Head-
quarters or in the  Regions.  The  NEIC focus is on provision of  specialized  in-
vestigatory assistance,   technical  support  for  case  development for  recovery  of
funds expended for cleanup or other remedies, continuing update and refinement of
enforcement analytical  procedures including  high hazard laboratory  procedures,
high hazard sample  analysis associated with the development of priority enforce-
ment cases,  technical  support  of regulation  and guidance development  for the
Agency's Superfund  enforcement  program,  and specialized assistance to  State en-
forcement activities.

     Hazardous ; Substance i Technical Enforcement —  This  program  element  Is  the
technical  component of the  Superfund  enforcement  program.   As  a  part  of negotia-
tions of  court ordered   or  voluntary  consent decrees, technical  enforcement de-
velops remedial  action  plans for submission to  defendants,  reviews plans  pre-
sented by defendants  to  assure technical adequacy  and consistency with  consent
decree goals,   and  monitors privately  financed  cleanup.   A major effort  in this
program will be  to  develop  and  Implement procedures  to ensure  that technical in-
formation in  support  of enforcement,  Including  cost recovery cases, is  legally
defensible and  of a  high  quality.   In  addition, this  program  will  review and
analyze the technical  aspects  of policies  and  regulations developed  under the
authority of the Comprehensive  Environmental Response,  Compensation,  and Liabil-
ity Act (CERCLA)to  ensure their validity and defensibllity  In  potential enforce-
ment actions.
                                       SF-26

-------
     HazardousSubstance LegalEnforcement —  this program  provides  the  legal
staff for enforcement efforts Under  theSuperfund  program.   The  major activities
under this program Include  the  development of the  legal  documentation  necessary
to Induce privately  financed cleanup of  hazardous waste sites  and  spills.   In
cooperation with technical enforcement staff, this  program will  issue demand let-
ters, administrative  orders  and participate  with the Department  of Justice legal
staff in negotiations of consent decrees.  In addition, EPA  legal staff will work
with the Department  of  Justice  to initiate  cost recovery actions when a  Super-
fund-financed response has been taken.  Finally, this  program will  enable  EPA to
ensure a nationally consistent enforcement policy under Superfund.

TECHNICAL SUPPORT - OLEC

1981 Accompl1shments

     In 1981, $509,400 was  obligated  in  support of specialized technical  support
capabilities provided by  the National Enforcement  Investigations  Center  (NEIC).
These capabilities include  technical support  in  high-hazard  and  high  priority
cases, and  the  development  of  technical   enforcement  procedures  and protocols.

1982 Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                    $2,005,100      $2,005,100

     The net Increase of  +$2,005,100 results  from several   actions,  as  follows:

     ~  Restructuring.  (+$2,005,100)  With  the  restructuring  of  Hazardous  Sub-
     stance Response, this program element was created.

1982 Program

     In 1982, the  Agency  is allotting a  total  of $2,005,100 and  15  permanent
workyears from  the  Hazardous  Substance  Response  Trust  Fund  for  this  program.

     These resources  are being used to provide investigatory and enforcement ana-
lytical capability to the Superfund  enforcement program.  Technical  capabilities
are being made  available to Headquarters, Regional,  and State  enforcement pro-
grams in support of high priority or technically complex enforcement cases.  This
Includes records  review,  on-site  and off-site  investigations,   preparation  and
analysis of high hazard samples, a wide range  of specialty  sampling and analyti-
cal procedures,  evidence audit control   for  State and  regional  investigative
personnel, and  expert testimony and  follow-up.  Safety,  investigative,  analyti-
cal, and  contractor  guidance manuals are  being updated to  reflect  state  of the
art technologies and practices.

1983 P rptram Request

     The Agency requests a total of $2,346,200  and  15 permanent workyears from the
Hazardous Substance Response Trust Fund for this program.   This represents an In-
crease of 5341,100.  This  increase  reflects increased  Agency  Superfund activity
and an Increased emphasis on evidence audit control.

     The National Enforcement Investigations Center (NEIC) will provide technical
support for the Agency's  initiative  to manage  and  prioritize significant litiga-
tion cases.  In this capacity,  NEIC  will  be  able to concentrate  Its resources on
cases which  are precedent-setting,  and which  will provide  the  greatest  savings
or recoveries  for the  Fund.   NEIC  will  perform  several  specialized  technical
support functions for the  Superfund  enforcement program.  These  include develop-
ing and  refining  procedures and  protocols  for  various enforcement functions,
site entry and  sampling in high hazard situations,  evidence  audit, which includes
                                       SF-27

-------
chain of  custody,  and evidence  security and  quality  control.  When  requested,
NEIC will also  assist the Regions in  high  priority cases involving high  hazard
wastes by performing site entry,  sampling, and preparation of high  hazard samples
for analysis by Regional  and  contract  laboratories.  Additionally,  sample  analy-
sis will  be  performed in nationally  managed or  high  priority cases and for  de-
velopment and refinement of enforcement protocols.

     NEIC will also assist the Federal  Bureau of Investigation (FBI) and regional
investigative staffs In  criminal  Investigations  of uncontrolled hazardous  waste
disposal and  will  train  FBI personnel   1n  EPA technical evidence  gathering pro-
cedures.

HAZARDOUS SUBSTANCE TECHMICAl- ENFORCEMENt

1981 Accomplishments

     In 1981  $1,947,700  and 22.6  permanent  workyears were obligated.   This pro-
gram supported actions  Initiated  by the Uncontrolled Hazardous Waste Site  En-
forcement program.  Resources were used  to  continue to  support cases filed under
the Resource  Conservation and Recovery  Act  and to support ongoing  case develop-
ment efforts within the Agency.

1982 Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                   $13,204,900     $12,340,200

     The net  increase  of +$12,340,200  results from several  actions, as follows:

     "  Restructuring.   {+$13,204,900)    With the restructuring  of  Hazardous Sub-
     stance Response, this program element was created.

     ~ Beprogra^1ng«  (-$64,700)  During the  development of the operating plan,
     several miscellaneous reprogrammings, which are not  reportable to Congress,
     were made  to  this   activity  and  resulted  1n net  decrease  of  -$64,700.

     Congressional Actions.  (-$800,000)  A reduction of  $800,000  was  applied to
     this program  element to meet Congressionally  mandated appropriation levels.

1982 Program

     In 1982  the  Agency  is  allotting  a  total  of  $12,340,200  and  147 permanent
workyears from  the Hazardous  Substance  Response  Trust  Fund  to   this  program.
The 1982  program   includes  both  the  legal and technical  aspects of enforcement.

     The focus of the program Is on obtaining privately  financed cleanups at haz-
ardous waste  sites.   This includes  preparing letters notifying responsible par-
ties of their potential  liability  and  demanding cleanup  actions,  Issuing  admin-
istrative orders, negotiating remedies in voluntary consent decrees, filing civil
judicial actions and negotiating judicially ordered consent decrees.  In addition,
program support continues to  be provided  for the ongoing imminent hazard cases
carried over  from prior years  and  for  actions  to  recover  fund  expenditures.

1983 Program Request

     The Agency requests a  total  of  $9,219,700 and 84.9 permanent  workyears from
the Hazardous Substance  Response  Trust Fund for this program.   The reduction of
S3,120,500 and 62.1 permanent workyears  is caused by a reorganization of enforce-
ment responsibilities  within  EPA,   Resources  associated  with  judicial  case  de-
                                       SF-28

-------
veloproent and legal activities will be transferred to the new Office of Legal  and
Enforcement Counsel.

     In 1983,  the  EPA  hazardous  substance  technical  enforcement program  will
compile, from various sources, technical data  including the  nature of the hazard
at hazardous waste sites, the health and environmental consequences of a release,
and possible technical remedies to be  considered  at  specific sites.  This infor-
mation is necessary  for  the continued Issuance of notice  letters  to  parties  re-
sponsible for problem hazardous sites, negotiations  of  remedies  with  responsible
parties, the Initiation  of  administrative  or judicial  actions to  secure cleanup
by responsible parties,  and filing of appropriate  cost recovery  actions  to  re-
coup government removal  or remedial expenses.

HAZARDOUS SUBSTANCE LEGALENFORCEMENT

1981 Accompl1shments

     This program did not exist as a discrete program element in 1981.

1982 Program

     This program does not exist as a discrete program element in 1982.

1983 Program Request

     The Agency requests a total  of $3,762,600  and 66  permanent workyears from the
Hazardous Substance Response trust Fund for this program.  This 1s an increase of
53,762,600 and 66  permanent workyears, which reflects  the fact  that  this is the
'Hrst year of this newly established program element.

     In 1983, this  program  will  be devoted  to addressing those  enforcement  ac-
tions necessary to Induce cleanup, or  to recover  Federal  costs  related to clean-
up, of  hazardous  waste  sites that present  an imminent  hazard.   Administrative
orders and/or  civil  actions  under CERCLA and  other statutory  authorities  will
be used against those Identified parties who fail to properly  undertake removal
or remedial  actions  to  clean up hazardous sites.   This Includes  the  seeking  of
punitive damages against  those  parties.   Where applicable,  actions will  be Ini-
tiated to recover  Federal  expenses where Superfund resources have been spent to
clean up uncontrolled hazardous waste  sites or spills.  Litigation activities are
conducted in cooperation  with the Department of  Justice,  with  technical support
provided by the Office of Solid Waste and Emergency Response.

     Resources requested  provide  for  the  establishment of  enforcement policies
to ensure consistent legal  approaches  to  site  cleanup.  Headquarters  enforcement
personnel will  determine the proper enforcement approach to be applied at Identi-
fied hazardous  waste sites.   These  actions  include administrative  orders,  and
the initiation  of  civil   or  criminal  actions under  CERCLA or other authorities.

     Headquarters staff will establish basic legal enforcement policies to ensure
coordination of Fund  financed cleanup and use of enforcement authorities.  Head-
quarters will also  ensure national consistency in legal efforts to: 1) seek pri-
vately-financed cleanup  (secured by "Agreements", administrative  orders, or con-
sent decrees); 2)  issue  administrative orders under  §106{a)  of CERCLA or other
statutory authorities  in  conjunction with  technical  staff  in  the  Office  of
Waste Programs Enforcement; and 3) develop cases and  Initiate civil actions under
§106(a) of CERCLA,  or other appropriate  authority and 4) where appropriate, seek
treble damages authorized under §107(c)(3) of CERCLA.

     Where decisions  are made to  pursue Fund-financed cleanup and recover Fund
expenditures through  cost-recovery actions,  Headquarters  staff  will  participate
in the development of "recovery" actions under §112 of CERCLA.  This will involve
the establishment  and implementation  of uniform  national  policies on the ident-
                                       SF-29

-------
ification of responsible parties, and  the collection and  documentation  of judi-
cially admissible  evidence  concerning  contamination and   recoverable  Fund  ex-
penditures.

     Regional activities will  focus  on participation  in  the identification  of
sites; investigations to determine the identity and financial  viability of poten-
tial responsible parties; and  assessments of  whether to  initiate  immediate  en-
forcement action or  to  initially rely  on  Fund financed removal   or  remedial  ac-
tions.  Regional  activities  will   also include  negotiations  with  responsible
parties and development of  necessary legal support  documentation  such as affida-
vits, pleadings,  orders,  and  complaints.   Privately financed  actions  will  be
monitored to  assure   compliance   with   applicable   guidelines  and  requirements,
and with  the terms  of settlement.   Assistance will be  provided  to States  to
assure the collection  and  documentation of  necessary evidence for  Fund-financ-
ed, State managed  sites.  This evidence will constitute an integral  part of sub-
sequent "recovery" actions.
                                       SF-30

-------
Page Intentionally Blank

-------
Management and
    Support
      SECTION TAB

-------
Page Intentionally Blank

-------
                                              SUPERFUHO

                                        Management And Support

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
PROGRAM
                                              (DOLLARS IN THOUSANDS)
Hazardous Substance
Planning & Evaluation
 Hazardous Substance Response         $95.5
 Trust Fund

Hazardous Substance
Financial Management
Headquarters
 Hazardous Substance Response          $5.3
 Trust Fund

Hazardous Substance
Financial Management
Regions
 Hazardous Substance Response         $30.2
 Trust Fund

Hazardous Substance
Administrative Management
lleadqua rters
 Hazardous Substance Response          $9.7
 Trust Fund
$2,360.0   $2,360.0
-$2,360.0
  $928.0     $928.0     $778,9   -$149.1
  $200.0     $172.0     $283.8    $111.8
$3,840.0   $3,840.0   $3,028.0   -$812.0

-------
                                                              SUPERFUMD

                                                        Management And Support

                                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE  +
                                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE  -
                                                                 1982       1982       1982            1983 VS 1982
                                                              (DOLLARS IN THOUSANDS)
i
LJ
ro
Hazardous Substance
Administrative
Management-Regions
 Hazardous Substance Response         $50.6
 Trust Fund

Hazardous Substance
Occupational Health
and Safety
Headquarters
 Hazardous Substance Response         $58.0
 Trust Fund

Hazardous Substance
Support Services
Headquarters
 Hazardous Substance Response      $1,636.3
 Trust Fund

Hazardous Substance
Support Services
Regions
 Hazardous Substance Response        $339.5
 Trust Fund
                                                                           $640.0     $601.6     $271.1    -$330.5
                                                                           $950.0     $950.0     $665.0   -$285.0
                                                                         $9,990.0   $6,590.0   $3.097.3  -$3,492,7
                                                                           $632.0     $647.2     $964.6     $317.4

-------
                                                             SUPERFUND

                                                       Management And Support

                                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                1982       1982       1982            1983 VS 1982
                                                             {DOLLARS IN THOUSANDS)
i
CO
u
Hazardous Substance
Laboratories 4 Facilities
 Hazardous Substance Response
 Trust Fund

Hazardous Substance
Inspector General
 Hazardous Substance Response
 Trust Fund

Natural Resource Claims
 Hazardous Substance Response
 Trust Fund

Computer Services
 Hazardous Substance Response
 Trust Fund

Hazardous Substance
Legal Services
Headquarters
 Hazardous Substance Response
 Trust Fund

Hazardous Substance
Legal Services
Regions
 Hazardous Substance Response
 Trust Fund
                                                     $25.5
                                                     $56.9
                                                                        $5,500.0   $3.500.0
                             -$3,500.0
                                                                        $2,520.0   $3.102.9   $2,813.9   -$289.0
                                                                           $40.0      $40.0      $40.0
                                                                          $950.0     $950.0   $1,435.0    $485.0
$120.0     $120.0     $280.3    $160.3
$200.0     $206.1     $236.0     $29.9

-------
                                              SUPERFUHO

                                        Management And Support

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE     1983    DECREASE -
                                                  1982       1982        1982            1983 VS  1982
                                               {DOLLARS  IN THOUSANDS)
Hazardous Substance
Office of Policy and
Resource Management
 Hazardous Substance Response
 Trust Fund
$16.4
$280,0
$280.0   $1,432.1  $1,152.1
TOTAL:
 Hazardous Substance Response      $2,323.9
 Trust Fund

Management And Support  TOTAL      $2,323.9
                  (29.150.0  $24,287.8  $15,326.0 -(8.-961.8


                  $29,150.0  $24,287.8  $15,326.0 -$8,961.8
PERMANENT FULL-TIME HQRKYEARS
Hazardous Substance
Planning & Evaluation

Hazardous Substance
Financial Management
Headquarters

Hazardous Substance
Financial Management
Regions
                        4.0
                        8.0
                        5.0
              4.0
              8.0
              5.0
                       -4.0
              5.0      -3.0
              6,0       1.0

-------
                                               SUPERFUND

                                         Management And Support

                                      ACTUAL  •  JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                       1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                  1982       1982       1982            1983 VS 1982
 Hazardous Substance
 Administrative Management
 Headquarters

 Hazardous Substance
 Administrative
 Management-Regions

 Hazardous Substance
 Occupational Health
 and Safety
 Headquarters

 Hazardous Substance
1 Inspector General

 Natural  Resource Claims

 Hazardous Substance
 Legal  Services
 Headquarters

 Hazardous Substance
 Legal  Services
 Regions

 Hazardous Substance
 Office of Policy and
 Resource Management
35,0       38.0       2Z.O     -13.fr
 fr.O



 3.0




13.0


 1.0

 2.0



 1.0



 2.0
 6.0       10.0       4.0
 3.0




22.0


 1.0

 2.0



 1.0



 2.0
 2.1       -.9
22.0
           3.8
1.0

S.8



1.0



7,0       5.0

-------
                                              SUPERFUNO

                                        Management And Support

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIHATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
TOTAL PERMANENT WORKYEARS
3.0
80.0       89.0       81.9      -7.1
TOTAL HORKYEARS
Hazardous Substance
Planning I Evaluation

Hazardous Substance
Financial Management
Headquarters

Hazardous Substance
Financial Management
Regions

Hazardous Substance
Administrative Management
Headquarters

Hazardous Substance
Administrative
Management-Regions

Hazardous Substance
Occupational Health
and Safety
Headquarters
 .5
 .7
 .1
                      4.0
                      8.0
 5.0
 6.0
 5.0
            4.0
            8.0
5.0
5.0
                    -4.0
           5.0      -3.0
6.0       1.0
                     43.0       43.0       25.1     -17.9
6.7       10.0       3.3
3.5      -1.5

-------
         SUPERFUND

   Management And Support

ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
 1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
            1982       1982       1982            1983 VS 1982
Hazardous Substance
Inspector General
Natural Resource Claims
Hazardous Substance ,6
Legal Services
Headquarters
Hazardous Substance 1.1
Legal Services
Regions
Hazardous Substance .7
Office of Policy and
Resource Management
TOTAL WORKYEARS 3.7
13.0 22.0 22.0

1.0 1.0 1.0
3.0 3.0 6.0 3.0


5.0 4,3 5.0 .7


2.0 2.0 7.0 5.0


95.0 104.0 90.6 -13.4

-------
                                    SUPERFUNU

                              Management and Support

BudgetRequest

     The Agency requests a total of $15,326,000 and 81.9 permanent workyears from
the Hazardous Substance Response Trust Fund for Management and Support activities
in 1933.  This  represents  a decrease  of $8,961,800 and 7.1  permanent  workyears
from 1982.  The decrease represents a  number of  non-recurring start-up  costs and
initial implementation activities funded in 1981 and 1982.

Program Description

     This subactivity provides the basic management and  support services for the
Superfund program.  These  services include  functions  such  as  rent,  utilities,
financial and administrative management,  contracts  management, data systems man-
agement, occupational  health  and safety,  programmatic and  regulatory  analysis,
and budget  formulation  and  execution.  In  addition,  this  subactivity  includes
resources for the Offices of the  General  and Regional  Counsels and the  Office of
Inspector General*

     Hazardous Substance Planningand Evaluation — These  resources are  used to
provide economic  andregulatoryanalysis,IH3  to  establish  and  maintain  an
accountability system for the  Superfund program.  This  program element  has been
consolidated with the  Office of  Policy and Resource  Management in 1983  to re-
flect the Agency's recent reorganization.

     Hazardous^Substancei FinancialManagement-Headquarters and Regions —  This
component Is  representeB:: \ n :r"Ewo'"program  el ements.   The  resources  are  used to
maintain financial records, and to  track and report  on  the  use of the Hazardous
Substance Response Trust Fund.

     HazardousSubstance Admi n1strati ye Management - Headquarters and Keglons --
This componentis  represented  in two  program  elements.the  resources  are used
to fund  Superfund  administrative services  necessary  to  award  and  administer
contracts, process personnel  actions,   provide  central management  and  technical
support for  Superfund  information systems,  and  to  acquire  and maintain Super-
fund office and laboratory services.

     Hazardous Substance Occupational Health and Safety - Headquarters -- These
resources provide technical  assistance and  training  for theSuperfund  staff to
assure the  safety  of those employees  exposed  to toxic and  other hazardous sub-
stances.

     Hazardous Substance Support Services - Headquarters and Regions — This com-
ponent is represented in  two  program elements.  The  resources are used to cover
the costs of  space,  utilities, printing, equipment, and  other support  needs in-
curred by the Superfund program staff.

     Hazardous Substance Laboratories and Fact Titles — This program element pro-
vides funds for  constructionand modification  of laboratories to ensure the safe
handling of toxic and other hazardous substances.

     Hazardous Substance - InspectorGeneraT;--  This   program  eTement funds the
required pre-award,Interim andfinalaudits  of  contracts  awarded under the
Superfund program as well  as audits of Cooperative Agreements  with  the States.

     Natural Resource Claims --  This  program  element  provides  funds   for the
Board'"''of1""Arbitratorswhich  will  settle  disputes  regarding  payment of claims
for natural resource damages.
                                       SF-38

-------
     Computer Services --  These funds  cover the  data  processing  costs  (time-
sharing} of mairitaining the Superfund information systems.

     Hazardous Substance Legal Services - Headquarters  and  Regions —   This pro-
gram element funds tne Office of the General  Counsel  (OGC)  and the Offices  of  the
Regional Counsel activities  under  Superfund.  These  activities  include  statutory
interpretations of the Act, (CERCLA), and the issuance  of opinions and  advice  re-
garding the use of  the Hazardous Substance Response Trust  Fund and other financial,
administrative or  legal  issues.   In addition,   OGC  acts as  the Agency's  chief
counsel in defending regulatory and other Agency decisions regarding  the implemen-
tation of  CERCLA and provides  support for  the  enforcement litigation  program.
The Offices of the Regional  Counsel  advise and  assist the  Regions and States  in
interpreting the Act  and  represent  Regions  in  defensive litigation activities.

     Hazardous Substance Office of Policy and Resource  Management — This program
element provides resources for budget; support,policy analysis, management assess-
ments and  evaluations,  and  regulatory  review  under  the  Superfund  program.

HAZARDOUS SUBSTANCE PLAMMING AMP EVALUATION

1981 Accomplishments

     In 1981, the Agency  obligated $95,500 for this  program element.  The  Office
of Policy  Analysis (OPA)  assisted 1n  the  development  and  implementation of  a
comprehensive program  strategy  and  supported   the  revision  of   the  National
Contingency Plan (NCP).   The  Office  of Management Systems and  Evaluation  (OMSE)
began developing a Superfund accountability  and tracking system.  The Office  of
Standards and  Regulations  (OSR) provided technical  assistance for the  revision
of the NCP.      '                                       -              ...

1982 Explanation of Changes from January Budget  Estimate

                     January          March          Current
                     Estircate        Estimate        Estimate

                                    $2,360,000      $2,360,000

     The net increase  of +$2,360,000  results from  several actions, as  follows:

     •  Restructuring.   (+52,360,000)   With  the  restructuring of   Operations
     Support, this program element was created.

1982 Program

     In 1982, the Agency  is  allotting $2,360,000 and four  permanent work/ears in
support of this program.   In 1982, OPA is supporting revision  of the NCP, assist-
ing in developing  implementation guidance  and other regulatory actions,  and ana-
lyzing numerous major policy and program implementation issues.   OMSE  1s  complet-
ing the development and  implementation of a  comprehensive  tracking  and accounta-
bility system  for  program and enforcement activities.   OSR is  providing manage-
ment control of the regulatory process, technical support for regulatory actions,
and serving  as liaison  with the Office of Management and Budget on  regulatory
activities.

1983 Program Request

     In 1983,  resources  for  this  program will  be  consolidated into   the  Office
of Policy  and  Resource  Management  program element  to  reflect  the  Agency's
recent reorganization.
                                       SF-39

-------
HAZARDOUS SUBSTANCE FINANCIALMANAGEMENT - HEADQUARTERS

1981 Accomplishments

     In 1981,  the  Agency  obligated  $5.300  to  cover  the  start-up  costs  for
designing and  Implementing  a   financial  management   system  for  the  Superfund
program.

1982 Explanatiofi of Changes from January Budget Estimate.

                   January          March          Current
                   Estimate  '      Estimate        Estimate

                                   $928,000        $928,000

     The net increase of +$928,000 results from several actions:

     -  Restructuring.   (4-$!,208,000)   With  the  restructuring  of  Operations
     Support, this program element was created.

     "  Reproaranmiing.  (-$280,000) As a result  of  the Agency's recent reorgani-
     ze tTorTTailplFFuml resources  for  the Office  of  the Comptroller, (-$280,000)
     were transferred from Hazardous Substance Financial Management to the Hazard
     ous Substance Policy and Resources Management program element.

1982 Program

     The Agency  Is  allotting $928,000 and  eight permanent workyears  to  support
this program in 1982, $408,000 of which is for computer services and enhancements
to the  Agency's  billing  system.   The  Financial  Management  Division (FMD)  is
providing basic  funds  tracking and resource  reporting  of  program expenditures.
FMD is  compiling  financial  information  on  contract  and  other  related  costs
specific to  site  and  spill  incidents.  Other  activities  include,  preparing
summaries and  developing  a  record  of  receipts  and  disbursements  from  the
Hazardous Substance  Response  Trust  Fund;  establishing  and  maintaining  GAO-
approved accounting  systems;  and providing  management control  and  support  of
billing and  collection  actions to  recover costs  from  responsible  parties.   In
addition, FMD is  maintaining funds accounting in support of  the budget process;
meeting the Agency's requirements to provide full disclosure of financial  activi-
ties*, providing  for payment  of  vouchers  from  State,  Federal,  and  commercial
entities; monitoring cash  flow; applying the  Federal  cash and audit management
procedures prescribed by  OMB  and  6AO;  and ensuring  data  integrity  and  quality
of financial information.

1983 Program Request

     The Agency  requests  $778,900 and five permanent  workyears to continue this
program in  1983,  a  decrease  of  $149,100  and  three  permanent  workyears.   This
request includes  $240,000  for  an Interagency agreement for  computer services.
The activities identified above will  be continued  and  specific  requirements  of
the 1983  program will  be  met.  The  decrease  is  the  result   of non-recurring
start-up costs in 1982.

HAZARDOUS SUBSTANCEFIHAHCIAL MANAGEMENT— REGIONS

1981 Accompl1shments

     In 1981, the $30,200  and  .5 permanent workyears  obligated for  this  program
covered the  start-up costs  associated  with  the establishment  of  a  financial
system to  support the Regional Superfund program.  Agency  efforts were directed
toward implementing  financial  management and  funds  tracking  procedures  for the
                                      SF-40

-------
program and  assuring  that  they   conform  to  the  Agency  financial  management
systems.

1982 Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                     $200,000        $172,000

     The net  Increase  of  +$172,000 results  from  several  actions, as  follows:

     "  Restructuring.   (+$200,000)  With the restructuring of Operations Support,
     this program element was created.

     " Reprpgraromlng.  (-$28,000)  During  the  development  of the operating plan,
     several miscellaneous reprogrammings,  which are not reportable to Congress,
     were made  to  this   activity  and  resulted  in net  decrease  of  -$28,000.

1982 Program

     The Agency  is  allotting  $172,000  and  five  permanent workyears for  this
program.  The  Regional  financial  management offices are  providing the  follow-
ing services  In  support  of the  Superfund  program:   (a)   basic regional  funds
tracking, accounting and  reporting  of  specific site and spill  response  actions;
(b) collection  of financial  data to support billing and collection  actions and
recoveries from  responsible  parties; (c) cash  flow management; and,  (d)  proper
entry of  Superfund commitments  and obligations  Into  the  Financial  Management
System.

1983 Program Request

     The Agency  requests  $283,800 and  six permanent workyears to  support  this
program in  1983,  an Increase of $111,800  and  one permanent workyear.   In addi-
tion to  carrying out  the functions  cited  under the  1982  program,  the  Agency
will enhance financial  tracking and accountability.

HAZARDOUS SUBSTANCE ADMINISTRATIVE MANAGEMENT - HEADQUARTERS

1981Accomplishments

     In 1981,  the Agency obligated  $9,700  for administrative  services  required
to initiate the Superfund program.   Activities  funded under this program element
include execution of  required personnel actions,  contract actions to carry out
the response activities  authorized by the  Act, administrative  support  services
including mall  distribution,  telecommunications,   and  printing, and  the initial
modification and  enhancement  of  current Agency-wide Information  systems  to  meet
the Increased data collection requirements  of the Act.

1982 Explanation  of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                    $3.840,000      $3,840,000
     The net increase of +$3,840,000 results from the following action:

     "  Restructuring.    (+$3,840,000)    With  the  restructuring  of  Operations
     Support, tim program element was created.
                                      SF-41

-------
1982 Program

     The Agency  is  allotting  $3,840,000  and  35 permanent  workyears  for  these
activities in 1982.   Efforts are being expended as follows:

     -  5136,000  and  two  permanent  workyears  to  maintain  and  support  the
        personnel requirements of the program staff;
     -  $1,510,000 and 26  permanent  workyears to award  and  administer contracts
        required to  carry out response and remedial  activities;
     -  $1,334,200 and  three  permanent  workyears  to  provide central  technical
        support for  developing,  testing,  operating,  and maintaining  the  infor-
        mation systems required  to collect  and  track notification data,  assess
        and set  site  cleanup  priorities,   identify  financial   responsibility,
        track and report  cleanup  actions,   and  monitor enforcement  activities;
     -  5859,600 and  four permanent  workyears  to  manage  the  design and modifica-
        tion of  EPA  laboratories  to permit  analysis of  toxic  samples  and  to
        provide telecommunications, printing, space  management,  and support serv-
        ices.

1983 Program Request

     For 1983, the Agency  requests $3,028,000 and 22 permanent  workyears.   This
decrease of $812,000 and 13  permanent workyears reflects non-recurring  start-up
costs in the  areas  of technical  support  for information systems  and laboratory
design included in 1982.   1983 activities will focus  on maintaining administrative
services initiated and developed in 1982.   These include:

     -  $109,000 and 1.6 permanent workyears to maintain and support  the person-
        nel requirements of the program staff;
     -  51,308,000 and  18 permanent  workyears to  administer contracts  awarded
        in 1982 and  to award new contracts as needed;
     -  $1,178,000 and 2.4 permanent  workyears to continue the  central technical
        support for  operating  and maintaining Agency-wide Superfund  information
        systems;
     -  $433,000  to   provide  telecommunications,  printing,   and  other  support
        services.

HAZARDOUS SUBSTANCE  AOHIMISTRATIVE MANA6EMEMT - REGJ QMS

1981 Accomplishments

     In 1981, the Agency obligated $50,600 and  .3 permanent  workyears for admin-
istrative services to  support  the  initiation  of  the  program  in the  Regions.
This consisted mainly of space planning and equipment acquisition.

19S2 E xplanati on of  Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Ejt.imate        Estimate

                                     $640,000        $601,600

     The net  increase  of  +$601,600  results  from  several actions,  as  follows:
     *  Restructuring.  (+5640,000)  With  the restructuring of Operations Support,
     thi s prbgraiif el iment was created.

     -  Reprogramming.  (-538,400)  During the development of the operating plan,
     several mi see I)aneous reprogrammings, which are  not reportable to Congress,
     were made  to this  activity  and  resulted 1n  a net decrease of -$38,400.
                                        SF-42

-------
1982Program

     The Agency  Is  allotting $601,600 and  six permanent workyears  for adminis-
trative support  of  the  Regional  Superfund program.  The services  being provided
•include management  of  information  systems,  small  purchase  administration,  and
space management.

1983 ProgramRequest

     For 1983, the  Agency requests  $271,100 and  10  permanent workyears.   This
is a decrease of $330,500 and an Increase of  four permanent  workyears.  The de-
crease in dollars  reflects a realignment of funds between this.program element
and the  Hazardous Substance  Support Services  -  Regions  program element.   The
increase in  workyears  will  enable  the Regions  to provide coordination  between
financial,  contracts and procurement management.

HAZARDOUS SUBSTANCE OCCUPATIONAL HEALTH AMD  SAFETY^,- HEADQUARTERS

1981 Accomplishments

     In 1981, the Agency  obligated  558,000  and .1 permanent  workyear  to address
health and  safety concerns  under this  new program.   Activities in  this  area
included the  development  of  procedures  and guidelines  designed  to protect the
safety of  EPA field  and  laboratory  employees  and to monitor the  training and
certification of these employees.

1982 Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                     $950,000        $950,000

   The net Increase of +$950,000 results from the following action:

   "  Restructuring.  (+$950,000)  With the restructuring of Operations
   Support, this program element was created.

1982Program

     The Agency  is  allotting $950,000 and three permanent workyears  to this pro-
gram to  continue the  development  and  begin  implementation   of  procedures  and
guidelines to protect the safety  of  EPA  employees and monitor their  training and
certification.   In  addition,  a technical  support and evaluation  team  is  being
established to  conduct on-s1te  safety  inspections,  evaluate the  adequacy  of
safety programs  and to  support  EPA cooperative  agreements   with  the  National
Institute of  Occupational  Safety and Health (NIOSH) and  the  Occupational  Safety
and Health Administration (OSHA).   Contract funds  ($750,000)  for the  team and
training funds have been   Included  to meet  the  continuing need  for training of
our field  and laboratory employees in  new  scientific  procedures,   safe  work
practices, and legal considerations.

1983 Program Request

     The Agency  requests  $665,000  and 2.1  permanent workyears,  a  decrease of
5285,000 and  .9  permanent workyears from 1982 to  continue the Superfund related
work of  the  Occupational  Health  and Safety staff.  The  decrease  represents the
transition from  basic safety training courses to re-certification  courses.  These
funds will provide  technical  assistance and evaluation  of field  and  laboratory
safety programs  and  the development and monitoring of training courses designed
to provide  the  latest  safety  techniques  and  procedures.  The  requested  funds
include $515,000 for training courses and contract activities  as discussed above*
                                       SF-43

-------
HAZARDOUS SUBSTANCE SUPPORT SERVICES - HEADQUARTERS

1981 Accomplishments

     In 1931, the Agency  obligated $1,636,300 to cover agencywide  support  costs
of the  Superfund  Program  including rent,  ADP contracts,  and  the purchase  of
Immediately needed laboratory equipment.

1982 Explanation ofChanges from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate
                       77.          $§7§OT;D00      $"6V§9b,OoO

     The net Increase  of  +56,590,000 results  from several actions, as  follows:

     "  Restructuring.   (+$9,990,000)   With  the  restructuring  of  Operations
     Support, this program element was created.

     -  Cofioresslpnal Actions.   (-$3,400,000)   A  reduction  of  -$3,400,000  was
     applied to the riazardous Substance Response Trust Fund appropriation to meet
     Congressional 1y mandated appropriation levels.

1982 Program

     the Agency Is  allotting $6,590,000 for  the  continuation of these  services
1n 1982.  1982 resources include:

     -  53,468,000 for Agency-wide and headquarters support costs;
     -  52,532,000 for laboratory and field equipment;
     •  5590,000 for health  and  safety  training.  A large  portion of these  funds
        ($425,000) are  being used  to  pay  for health  and  safety  training  for
        field  employees  of  the  Office of Emergency  and Remedial Response.   The
        remainder is  for  training  laboratory  chemists, supervisors,  and  other
        critical personnel required to support the Superfund program.

1983 Program Request

     For 1983, the Agency requests $3,097,300 for these support costs,  a decrease
of 53,492,700,  The  reduction in resource  needs reflects the  investment  in  non-
recurring items in  1982  such as laboratory and  field equipment.   In  1983,  the
major focus of  the  program will be  to  continue to fund the  Agency-wide  support
costs of the Superfund program.   The 1983 requests Includes:

     -  32,764,000 for agency-wide and headquarters support costs including  rent,
        telephone, postal  costs, and  workman's compensation as well as the  head-
        quarters cost  of  Janitorial,   housekeeping   and  other  general  support
        services;
     -  5333,300 for health  and  safety training.   This includes training of new
        employees as well  as updated and additional training of current employees
        to meet annual certification requirements.

HAZARDOUS SUBSTANCE SUPPORTSERVICES - REGIONS

1981 Accomplishments

     In 1981, the Agency  obligated $339,500 for  Regional  support  costs  such as
utilities, local  telephone  costs,  space  and  equipment maintenance,  and  other
general service costs associated with the Superfund program.
                                        SF-44

-------
1982 Explanation of Changes from January Budget Estimate


                     January          March          Current
                     Estimate        Estimate        Estimate

                                     $632,000        $647,200

     The net  Increase  of  +$647,200 results  from several  actions,  as  follows:

     "  jestructuring.   {+$632,000}  With the restructuring of Operations Support,
     thisprogramelement was created.

     "  ReprograiMilng.   (+$15,200)   During the development of the operating plan,
     several miscellaneous reprogrammings, which are not  reportable  to  Congress,
     were made  to  this activity  and resulted  in a net  increase  of  +$15,200.

1982 Program

     The Agency  is  allotting $647,200  to  cover the Regional  support  costs  of
this program in 1982.

1983 Program Request

     The Agency requests $964,600 to cover Regional  support  costs such  as utili-
ties, local   telephone  costs, printing,  minicomputer operations,  and  equipment
maintenance associated with this program.  Although  this  is  an  apparent increase
In funds of $317,400, It is offset  by the reduction  of  $330,500  of  support funds
that were contained  in Hazardous  Substance  Administrative Management  -  Regions
in 1982, but are requested in this  program element for  1983,

HAZARDOUS SUBSTANCELABORATORIES AMDFACILITIES

1981 Accompl i shments

     Mo resources were obligated for this program in  1981.

1962 Explanation of Changes from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                    $5,500,000      $3,500,000

     The net increase  of  +$3,500,000 results  from several actions, as  follows:

     "  Restructuring.    (+$5,500,000)    With  the  restructuring  of Operations
     Support, this program element was created.

     -  Cj»ngre_ss.ional Actions.   (-$2,000,000)-  A  reduction   of  -$2,000,000  was
     applieatotheHazardous  Substance  Response Trust  Fund  appropriation  to
     meet Congressionally mandated appropriation levels.

1982 Program                               ;

     The Agency  is  allotting $3,500,000  to  modify  EPA  laboratories in  1982  to
permit the handling and analysis of highly hazardous samples gathered at hazard-
ous waste sites and  spills  in support  of the Superfund program.   These  modifica-
tions are  required  to  protect  the health  and safety  of laboratory  personnel
conducting the  sample  analysis.  EPA proposes to construct a containment labora-
tory to address  this requirement  as well as  to  ensure  the proper supervision  of
persons engaged in lab  analysis  at  contractor and state facilities.  This facility
                                      SF-45

-------
will be used to analyze "high  risk"  samples  and  to  dilute  other samples to allow
safe handling in other laboratories.

     The remaining  samples  gathered pursuant  to the Act  are "medium  risk"  and
will be  analyzed  by  contractor  laboratories,  EPA  Regional  Surveillance  and
Analysis(SSA) laboratories  and  state  facilities.    In  1982,  EPA  is  conducting
health and  safety  modifications  at selected S&A labs  which will enable  them to
handle these medium risk samples safely.

1983 Program Request

     No funds are  requested  for  1983 because this activity  represents  non- recur-
Ing costs for laboratory modifications  met during 1982.

HAZARDOUS SUBSTANCE - INSPECTOR SEMERAL

19B1 Accomplishments

     No resources were available for this program in 1981.

1982 Explanation of Changes from January Budget Estimate

                  January          March          Current
                 Estimate        Estimate        Estimate

                                $2,520,000      $3,102,900

     The net increase  of  +$3,102,900  results  from  several actions, as  follows:

     "  EJestructuriinj.   (+$2,520,000)    With  the   restructuring  of  Operations
     Support, this program element was  created.
                         (+$582,900)  This  reprogramming will provide  additional
     resbu rces to an ow the Inspector General's office to carry  out a more active
     role In Superfund,  as requested by  the Administrator.  The Impact  on  the
     losing program element Is minimal.   Some projects associated with  developing
     manuals on site safety containment and confinement and field evaluations may
     be delayed.   (This  reprogramming  of +5420,300  was  included  in  letter  to
     Congress on December 16, 1981).

     During the development  of the operating plan,  several  miscellaneous repro-
     grammings, which are  not  reportable  to  Congress,  were made to this  activity
     and resulted in a net increase of +$162,600.

1982 Program

     The Agency is  allotting a total of $3,102,900  and 22 permanent workyears to
this office  in 1982.  Extramural  contract  resources  are  being  used  for audit
services provided by other Federal  agencies  and CPA firms.  The  016 is  auditing
the financial and program  management aspects of the Fund, and issuing  an interim
report to Congress  regarding all payments, obligations,  reimbursements and other
uses of the Fund.  The OIG is conducting and  coordinating external audits of State
Cooperative Agreements,  conducting catalog  price  audits,  and  conducting other
audits of Superfund  contractors to  determine the reasonableness  of costs and the
adequacy of contractor's management systems.

1983 Program Request

     The Agency  requests a total  of  $2,813,900 and  22 permanent  workyears  for
this program in  1983,  a  decrease  of $289,000  from 1982.  The  decrease  reflects
the completion of  initial  implementation  efforts.   In 1983, the  OIG will submit
the final  report to  Congress  which  will   appraise  the  adequacy  of  Superfund
administration to  ensure  that established  policies  and  procedures  are  being
                                      SF-46

-------
followed; that all receipts and disbursements are properly authorized and record-
ed; and that claims are appropriately and expedltiously considered.   In addition,
the DIG will continue to conduct and coordinate external  audits of State agencies
and other Superfund  contractors,  as  necessary,  to ensure  the integrity of  the
Fund's administration.
NATURAL RESOURCE, CLAIMS
1981 Accomplishments
     No funds were available for this activity 1n 1981.
1982 Program
1982 Explanation of Changes from January Budget Estimate
                     January          March          Current
                     Estimate        Estimate        Estimate
                                      $40,000         $40,000
     The net Increase of +$40,000 results from the following action:
     ""  Restructuring.  (+$40,000)  With the restructuring of Operations Support,
     this program element was created.

     In 1982,  the Agency  is allotting $^0,000  and one  permanent  werkyear  for
the activities  of the  Board of  Arbitrators.   The  Board  was  established  under
section 112  (a)  of  CERCLA and 1s  authorized to  make the  final  determinations
on disputed claims for natural  resource damages.  In 1982,  the Agency efforts  are
focusing on establishing the Board and holding Initial  hearings on any unresolved
claims.
1933Program Request
     The Agency requests $40,000  and one permanent workyear  in  1983  to continue
the activities  of the Board of Arbitrators.   These funds will  enable  the  Board
to continue to  carry out  Its  responsibilities  under section 112 (a)  of CERCLA.
COMPUTER SERVICES
1981Accomplishments
     No funds were available for this activity 1n 1981.
1982 Explanation of Changes from January Budget Estimate
                     January          March          Current
                     Estimate        Estimate        Estimate
                                     $950,000        $950,000
     The net Increase of +$950,000 results from the following action:
     •  Restructuring.  (+$950,000)  With the restructuring of Operations Support,
     this program element was created,
1982 Program
     The Agency  is  allotting  S950.000 to  provide timeshare  services  from  our
National Computer  Center  in  Research  Triangle  Park,  North  Carolina.   These
funds are providing computer services for the entire Superfund program.
                                      SF-47

-------
1983 Program Request

     The Agency  requests  $1,435,000  to  provide  timeshare  services  for  the
Superfund program  in  1983.   This  increase  of  $485,000  reflects the  cost  of
collecting, storing  and  processing additional  data  as  the systems become  fully
operational.

HAZARDOUS SUBSTANCE LEGALL SERVICES - HEADQUARTERS

1981 Accpmplishments

     In 1931, the  Agency obligated $25,500 and  .6 permanent workyears  for this
program.  These resources provided legal  advice  to the Superfund  program  in the

initial implementation of the Comprehensive Environmental  Response, Compensation
and Liability Act (CERCLA).

1982 Explanation of Changes from January^Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Jstimate

                                     $120,000        $120,000

     The net increase of +1120,000 results from the following action:

     ~  Restructuring.  (+$120,000)  With  the restructuring of Operations Support,
     this program element was created.

1982L Program

     In 1982, the Agency is allotting a total  of $120,000 and two permanent work-
years to this program.

     The 1982 Headquarters program provides advice and  consultation on financial
and administrative matters  such  as eligible uses  of  the Fund and appropriations,
staffing, and budget activities; legal guidance in program matters such as statu-
tory interpretation and revision  of the National  Contingency Plan; and coordina-
tion with and support of the enforcement litigation program.

19S3 Program Request

     The Agency  requests a  total  of  $280,300 and  5.8  permanent  workyears  for
this program, an  increase of $160,300 and 3.8  permanent workyears.  The increase
reflects a  need  for  increased legal  support to defend Agency Superfund decisions
and policies implemented In the first two years of the program.

     The 1983 Headquarters  program will  provide  Increased  support to the Super-
fund program through advice  and assistance to  Agency managers.   This  includes
consultation on  financial   and  administrative matters;  legal   support  for  the
development and defense of regulations and disbursement decisions; legal  guidance
on  statutory interpretation  and  development  of response  priorities;  and support
to  the enforcement litigation program.

HAZARDOUS SUBSTANCE LEGAL SERVICES-REGIONS   ,

1981 AccomolIshments
     In 1981,  the Agency  obligated  $56,900 and  .8  permanent workyears  to this
program.  With  these  resources, the  Regional  Counsels assisted  in establishing
Cooperative Agreements  for State  agencies  to administer  the Superfund program.
In addition,  they provided advice on legal problems  associated  with EPA removal
or remedial activities.
                                      SF-48

-------
1982 Explanation ofChanges from[January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                     $200,000        $206,100

     The net  increase of  +$206,100 results  from  several  actions, as  follows:

     '  ^structuring.  (+$200,000)  With the restructuring of Operations Support,
     this program element was created.

     "  Reprogrammlng.  (+$6,100)   During  the development  of the operating plan,
     several miscellaneous reprogranmings, which are  not reportable to Congress,
     were made  to this  activity  and  resulted  1n  a  net  increase  of  +$6,100.

1982 Program

     In 1982, the Agency 1s allotting a total of $206,100 and one permanent work-
year to this program.

     The 1982 Regional  program Includes  such activities  as  1) reviewing  State
Cooperative Agreements  for legal  sufficiency;  2)  providing  legal  guidance  to
States preparing  to  qualify  for  Cooperative  Agreements;  and  3)   responding  to
challenges to enforcement activities.

1983ProgramRequest

     The Agency  requests   a  total   of  $236,000  and one permanent workyear  for
this program, an  Increase of $29,900.   The  increase  reflects  Increased  Agency
Superfund activity.

     The Regional  program  will   continue  to  be  directed  to  providing  legal
assistance in  the  review of State  Cooperative Agreements  and  responding  to
challenges to enforcement activities.

HAZARDOUS SUBSTANCE OFFICEOF POLICY AND RESOURCE MANAGEMENT

1981 Accomplishments

     In 1981, the total resources  obligated  to this activity were  $16,400  and  .7
permanent workyears.   These  resources   supported  the  Office  of the  Comptroller
(OC) in the  Office  of Resource Management and were used  to revise the Hazardous
Substance Response Trust  Fund 1982 budget and to coordinate,  prepare  and  defend
the 1983 OMB budget  request,  to establish policies  for Fund control and to eval-
uate resource utilization.

1982 Explanation of Changes from January'Budget Estimate

                     January          March          Current
                     Estimate        Estimate        jstlmate

                                     $280,000        $280,000

     The net increase of +$280,000  results from several actions:

     -  geprggramming.  (+$280,000)  As a result of the Agency's recent reorganiza-
     tion,Superfund resources for the Office of  the Comptroller, (+$280,000) were
     transferred from  Hazardous  Substance Financial Management  to the Hazardous
     Substance Policy and Resources Management program element.
                                      SF-49

-------
T_96g Program

     In 1982, the Agency is allotting 5280,000 and two permanent workyears to this
activity.  The OC  is  conducting analyses,  making  recommendations and formulating
the 1983 Congressional Hazardous Substance Response Trust Fund Budget, providing
allowances and  other  budget  control   mechanisms,  reviewing  and analyzing  1983
operating plans, directing  the  1984 budget planning process  and identifying and
analyzing resource issues.

1983 ProgramRequest

     In 1983, this program element  includes  activities  formerly funded under the
Hazardous Substance  Planning  and  Evaluation program  element.   The request  of
SI,432,100 and  seven  permanent  workyears  for  the Office  of  Policy and Resource
Management including  $280,000  and three workyears  for the  Office  of  the  Comp-
troller and $1,152.1 and four workyears for the Offices of Policy Analysis (OPA),
Management Systems  and Evaluation  (OMSE),  and  Standards  and  Regulations (OSRK
This represents a  decrease  of  $1,207,900 and an  increase of  one permanent  work-
year from  1982  in  the  consolidated program.  The decrease  1n  contract  support
reflects the  completion  of several efforts  supporting  Agencywide initial Imple-
mentation efforts.

     OC will  conduct  analyses,  make recommendations and  formulate  the 1984 Haz-
ardous Substance Response Trust  Fund  budget,  analyze  and  review  workload and
pricing analyses,  issue  allowances and  other  budget control  mechanisms, review
and analyze 1984 operating  plans,  direct the 1985 budget planning  process,  ana-
lyze resource trends  and undertake special analysis to support resource manage-
ment decision making.   In  addition,   OC  will   work  with  the Department of the
Treasury in  developing  required  Hazardous  Substance   Response  Trust  Fund  pro-
jections.  OPA  will  conduct  analyses  in  support  of  regulatory  activities,
develop guidelines for cost-effective analysis of remedial response and undertake
a number of other policy, economic and financial efforts to assist in achievement
of overall program goals.  OMSE  will operate a tracking  and accountability system,
assess program  information requirements  and information systems,   and evaluate
other issues  of management concern in order to identify  steps that can be taken
to strengthen program performance.   OSR  will  review  technical assessments  of
selected remedial  responses, quality assurance measures for  remedial site Inves-
tigations, lab  practices,  and  chain of  custody  and documentation  procedures  to
ensure compliance  with the applicable Agency  regulations, guidelines, policies
and procedures.
                                      SF-50

-------
I • Ihwl • ^•wi ^9^r vni ^tir ^Hl^ ^fcwl mNlr ^«F vl^in& • • ^H^ ^M^
 Response Actions
        SECTION TAB

-------
Page Intentionally Blank

-------
                                              SUPERFUND

                                Hazardous Substance Response Actions

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982

                                              (DOLLARS IN THOUSANDS)
PROGRAM
Hazardous Spill 4
Site Response
 Hazardous Substance Response
 Trust Fund

Assessing & Replacing
Natural Resources
 Hazardous Substance Response
 Trust Fund

TOTAL:
 Hazardous Substance Response
 Trust Fund
Hazardous Substance
Response Actions
TOTAL
          $24,018.7
$24,018.7


$24,018.7
                     $136,680.0 $135,989.8 $184,729.9 $48,740.1
                                  $3,500.0   $1,500.0   $1,007.8   -$492.2
                               $140,180.0 $137,489.8 $185,737.7 $48,247.9
$140,180,0 $137,489.8 $185,737.7 $48,247.9
PERMANENT FULL-TIME WORKYEARS
Hazardous Spill &
Site Response

Assessing & Replacing
Natural Resources
               39.2
                          222.0      222.0      243.1      21.1
                                                            1.0       1.0

-------
                                                 SUPERFUNQ

                                   Hazardous Substance Response Actions

                                     ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE INCREASE +
                                      19fll     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                 1982       1982       1982            1983 VS 1982
                                              (DOLLARS IN THOUSANDS)
TOTAL PERMANENT HORKYEARS
39.2
222.0      222.0      244.1      22.1
TOTAL HORKYEARS
Hazardous Spill *
Site Response

Assessing 5 Replacing
Natural Resources
44.1
261.0      261.0      285.9      24.9
                       1.0
             1.0
1.0
TOTAL WORKYEARS
44.1
262.0      262.0      286.9      24.9

-------
                                    SUPERFUND

                       Hazardous Substance Response Actions

Budget Request

     The Agency  requests  a total of  $185,737,700  and 244.1 permanent  work/ears
for 1983,  an  increase  of $48,247,900 and  22.1 permanent  workyears over  1982.
The increase in  dollar  resources reflects a shift in 1983  from program develop-
ment to  field  implementation.   The primary  emphasis in the  early years of the
program has been on  developing the  basic  policies and  guidance  necessary  to
implement the  program.   1983 activities  will  be focused  on  much more  resource
intensive field activities necessary to carry  out  the program's basic mission  of
effective spill  and site response.

ProgramDescription

     This program is  responsible for  protecting public  health and  the  environ-
ment from the dangers  associated with releases of hazardous substances  Into the
environment.  The activities include responding to spills and releases of hazard-
ous substances,  cleaning up abandoned and uncontrolled hazardous waste sites, and
assessing and replacing natural  resources damaged by hazardous  substances.   The
authority to carry out these activities Is provided by the Comprehensive Environ-
mental Response,  Compensation,  and Liability Act  of 1980 (CERCLA).   Funds  to
implement the program  are provided from  the Hazardous Substance  Response  Trust
Fund which  is  composed of  excise  taxes  Imposed on  oil  and  chemical  industries
and revenues from the General Fund.

     Hazardous Sol11 and SIte Response — The Environmental Protection Agency co-
ordinates ah emergency  response  program to deal  with the  most serious  hazardous
material spills  and site emergencies  where  the responsible  party  or State and
local governments are unable to respond adequately.

     Approximately 10,000 uncontrolled and potentially hazardous waste sites have
been Identified.  Upwards  of 2,000 of  these  sites could pose  a major  threat  to
puDlic health or the  environment and  therefore  require some cleanup or  enforce-
ment action.  The  Environmental  Protection  Agency  has  developed  a  multi-year
program to  deal  with  the most  serious  sites identified In  conjunction  with the
States.

     Assessing and Replacing Natural Resources —  Section III  of CERCLA authoriz-
es payments for  costs  assoclated wi th Federal  or State efforts to restore,  reha-
bilitate, replace  or  acquire the  equivalent of natural  resources  damaged  as  a
result of hazardous  substance  releases.  EPA, in conjunction  with other Federal
agencies, will determine  if significant  or  Irreplaceable damage  to  natural  re-
sources has resulted  from a release of hazardous  substances;  determine  the eco-
nomic Impact of  any such damage; evaluate alternatives for restoring or replacing
these damaged natural  resources;  and  pay  the  costs of restoration  or rehabilita-
tion.

HAZARDOUS SPILL AMD SITERESPONSE

1981 Accomplishments

     A total of  S24.018.700 and 39.2  permanent  workyears  was  obligated  for this
activity in  1981.  These  resources  supported  Superfund  initial  implementation
efforts, including  emergency  responses and remedial  activities.  Major Implemen-
tation activities  and  accomplishments  in 1981  consisted  of:   revision of the
National Contingency Plan  to include procedures,  responsibilities and  standards
for  responding   to  releases  of  hazardous  substances   (promulgation  in  1982);
development and  coordination  of policies  to  ensure consistency  of  response;
establishment of  a  national site  notification system to  determine  the  universe
                                      SF-53

-------
of potentially  hazardous  abandoned  and  uncontrolled  sites;  development  of  a
national priority ranking system  for the worst  known sites; and formulation  of
policies to encourage State  participation.

     Major support activities in  1981  Included:   the collection and  analysis  of
field samples; the provision  of special  engineering  and technical  expertise  at
non-Federal response sites;  training of State and local  personnel;  and management
of an aerial  surveillance contract which provided aerial  photography,  mapping and
photo analysis.

     The major  response  activities  in  1981  were:   3  spill  removals  and  30
removal actions at  sites;  cleanup  monitoring at  675 hazardous substance  inci-
dents; 500 preliminary  assessments  of sites;  500  site  Inspections; and 40  site
investigations.  Full field  investigations/feasibility  studies were   started  at
10 sites,  as  well as  engineering studies  at 5  sites  and  remedial  Implementa-
tion at 1 site.

1982 Explanation of Changes  from January Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                  $136,680,000    $135,989,800

     The net increase of +$135,989,800  results from  several actions,  as follows:

     "  Mstructuring.   (+$136,680,000)   With  restructuring of  Hazardous  Sub-
     stance ........ Respohse, this new program element .was created.       .......

     "  ^programming.   (+$109,800)    During  the  development  of  the  operating
     pi an, several mi seel 1 aneous  reprogrammings,  which are not  reportable  to
     Congress, were  made  to  this  activity and  resulted in a  net increase  of
     +$109,800.
                      Acti ons .  (-$800,000)   A reduction of -$800,000 was applied
     to the  Hazardou s  Substance  Response  Trust  Fund to  meet  Congressional ly
     mandated appropriation levels.

1982 Program

     In 1982, the Agency  is  allotting a total of  5135,989,800  and 222 permanent
workyears to this  activity.   These  resources  provide  support  for  30  immediate
spill removals, 45 immediate  site removals, 15 planned  removals,  8,000 prelimi-
nary assessments, 1,500 site inspections, 300  site investigations, 42  full  field
Investigations/feasibility studies;  10 engineering designs; and 7 remedial  imple-
mentations.  State participation remains a high priority  in  1982.   Resources  are
being used for  cooperative agreements under which States manage  removal  and  re-
medial projects.  The  Agency expects  to  have between 15  an
-------
       AGENCY                               AMOUNT

HEALTH AND HUMAN SERVICES                 $3,344,000

JUSTICE                                    2,000,000

FEDERAL EMERGENCY MANAGEMENT
  AGENCY                                     200,000

COMMERCE (NOAA)                              400,000

TRANSPORTATION (USCG)                      1.483.000

        TOTAL                             $7,427,000

     Examples of the  specific activities that are  being  carried out  with these
funds include  developing  guidelines for  conducting  studies  at priority  sites,
response training for  Coast Guard personnel; development of  guidelines  for per-
manent relocation by the  Federal  Emergency Mangement Agency  (FEMA);  staff costs
for litigation  support by  the  Department of Justice;  and equipment  to  support
the conduct of natural  resource damage assessments by the Department of Commerce.

     In addition, reimbursable  funding for  the  Incident specific  activities  1n
direct support of EPA  Initiated response actions taken by these and  other agen-
cies will be provided as the need for these services arises.

1983 Program. Request

    • The Agency  requests  a total of $184,729,900 and 243.1  permanent .vorkyears
for this program.   This  1s an  increase  of $48,740,100 and 21.1 permanent work-
years from 1982, which reflects a significant Increase in  field  activities,  and
the proportionally  greater oversight  and  management they  require.   The  basic
groundwork to  identify the most  serious problem  sites  through  the  reporting
requirements mandated  under Section I03(c)(1)  of  CERCLA  along with  the  actual
site Investigations  and  assessements performed  in  the field will  be  concluded
In 1983.  The  resources  for remedial  activities will  be  devoted  to planning  and
carrying out cleanup actions.

     Resources requested  for  1983 will  continue the  emergency  response program
for major spills  and  releases  at hazardous waste  sites.   The Agency's  request
provides for  50  immediate  spill  removals  at  hazardous  substance  spills,  30
immediate site  removals  and 30  planned  removals at  various  hazardous  substance
sites.  An estimated 500  removal  actions taken  by responsible parties will  be
monitored on-scene and another 2,000 will be monitored in the office.

     For remedial activities,  the  requested resources will  support  2,000 pre-
liminary assessments,  500  site  Inspections, and  100 site  investigations.  The
Agency will undertake  56  full  field investigatons and feasibility  studies at the
worst known  sites along with 20 remedial designs  and 11  remedial  actions."  The
resources requested  for  State   activities will  be  devoted  to  developing  the
Cooperative Agreements with States  necessary before remedial  action can  begin  or
Cooperative Agreements which  give a State lead  responsibility for a particular
response activity.   In 1983,  States will  be in  charge  of the remedial  work  at
approximately 30% of the action being taken.

     1983 will mark  a  significant shift in priorities for this program.   Activi-
ties in  1981  and 1982  have been  focused on developing  the basic  policies  and
management systems necessary to ensure effective Implementation of field response
activities.  As  mentioned, these Include  revision  of the National  Contingency
Plan, development of community  relations strategies, and guidelines for maximiz-
ing State  participation  1n the  program.   In  addition,  the work  necessary  to
identify problem sites and  set priorities for enfprcement and cleanup action will
be completed.
                                      SF-S5

-------
     In 1983, the Agency's energies will  be directed toward carrying out the pro-
gram's primary mission, effective field  response at  both  spills and uncontrolled
or abandoned sites.  To this  end,  expected program accomplishments  in  1983 will
be heavily weighed  toward site preparation activities at  sftes on  the  recently
published Interim Priority List.  These activities Include  full  field  investiga-
tions and feasibility  studies to determine the  relative  merits of  various pro-
posed remedial measures followed by  actual  design  of the  measure that  1s  finally
selected.  The final result of these preparatory activities will be actual  imple-
mentation of selected  remedial  measures  that provide  an acceptable level  of long
term protection.

   Finally,  1983 will be the first full year of cooperation among various Federal
agencies with responsibilities  under the program.   The proposed  resource  levels
and activities of these agencies have  been  identified through  the Implementation
of an Interagency budget process mandated by Executive Order 12316.  EPA will  be
working closely  with  these  agencies  in  1983   to  ensure  a coordinated  federal
effort to carry   out  the  provisions  of  CERCLA.   Resources  in  support  of  the
incident specific activities  of other agencies will  be  provided  through  reim-
bursable agreements.   Examples  of  incident specific activities that may be per-
formed by other  agencies  include epidemlologlc  studies at  priority sites  by HHS,
permanent relocation of Individuals  at priority sites by  FEMA, and Coast  Guard
response to hazardous spill incidents occurring in coastal  waters.  These actions
will be triggered by EPA on-scene personnel  and other agencies  will be  reimbursed
once their specific actions are completed.

ASSESSING AMD. REPLACING NATURAL RESOURCES

1981 Accompl 1 shments

     During 1981, no funds were obligated for this activity*

1982 Explanation of 'Changes from vlanuary_Budget Estimate

                     January          March          Current
                     Estimate        Estimate        Estimate

                                   S3.500.000      $1, 500,000

     The net Increase of +$1,500,000 results from several  actions:

                        (+$3,500,000)  With  restructuring  of Hazardous Substance
                    new program element was created.

     -  Cong res si pnal Actions .   (-$2,000,000)   A  reduction  of  -52,000,000  was
     applied to  the Hazardous' Substance  Response  Trust Fund  to  meet  Congres-
     sionally mandated appropriation levels.

1982 Program

     In 1982, the  Agency  is allotting a total  of $1,500,000 to this  program  of
which 11,460,000  is for  extramural  activities.   These  contract  resources  Can
support up to four damage assessments and pay for one restoration.

1983 Program Request

     The Agency  requests  a  total   of  $1,007,800  and  one  permanent  workyear
for this  program of which  5960,000  1s  for  extramural  purposes.  This  decrease
of $492,200  reflects  the  anticipation that there  will  be  few  natural resources
damage claims.   Damage assessments  for these  claims  will  be  prepared  through
interagency agreements with  other Federal  agencies  or through private contracts.
These contract  resources  will  support up  to  two damage assessments and  pay  for
one restoration.
                                      SF-56

-------
                                                             SUPERFUND

                                                        Interagency Support

                                                    ACTUAL    JANUARY     MARCH     CURRENT   ESTIMATE  INCREASE  +
                                                     1981      ESTIMATE   ESTIMATE    ESTIMATE     1983    DECREASE-
                                                                1982       1982       1982             1983  VS 1982
               PROGRAM
                                                             (DOLLARS IN THOUSANDS)
7
Interagency Support
HHS
 Hazardous Substance Response
 Trust Fund

Interagency Support
USCG
 Hazardous Substance Response
 Trust Fund

Interagency Support
Justice
 Hazardous Substance Response
 Trust Fund

Interagency Support
NOAA
 Hazardous Substance Response
 Trust Fund
                                                                                              $3.292.0   $3,292.0
                                                                                              $1.514.8   $1,514.8
                                                                                              $2,100.0   $2,100.0
                                                                                                $365.0     $365.0
               TOTAL:
                Hazardous Substance Trust Fund

               Interagency Support      TOTAL
                                                                               $7,271.8  $7,271.8

                                                                               $7,271.8  $7,271.8

-------
                                   SUPERFUNO

                              Interagency Support

Budget Request

     The Agency  requests  a total of  $7,271,800  for Interagency  Support activi-
ties in 1983.  The requested resources will  support the ongoing Superfund program
activities of the Departments of Health  and Human  Services,  Justice, Transporta-
tion (USCG) and Commerce (NOAA).  In 1983 these ongoing activities will  be funded
through allocation  accounts.   In  1982,  these activites  are  funded under  the
Hazardous Spill and Site Response program element.

Program Description

     Executive Order 12316,  signed  by the President in August  of 1981,  requires
EPA to manage an Interagency budget process culminating in a  consolidated budget
request for the  entire  Superfund program to OMB and Congress,,  The activities of
other Federal agencies Mill  be  divided Into two basic  categories. The first cat-
egory Includes those activities  which are episodic in  nature and taken  in direct
support of site  or spill  response  actions.  Funds  to support  these activities
are included  in  the  Hazardous   Spill  and  Site  Response  program element.   The
second category of other Federal Agency  Involvement  concerns  support for ongoing
activities such  as basic  management structure, and  the development  of  policies,
guidelines and manuals.   EPA will transfer these resources to appropriate agencies
through allocation transfers.

DEPARTMENT OF HEALTH AND HUMAN SERVICES

1983 Program Request

     A total  of  $3,292,000  is   requested for the Department  to carry  out  the
following health related functions.

     0  Scientific support  for  the  review of incident specific  test results  for
        indications of possible human health hazard.

     0  Development of health related field guidance 1n  support of EPA  emergency
        response actions.

     0  Development of  standard guidelines for  the conduct  of  health  and epi-
        demiological  studies at priority sites.

     0  Production  of  worker  health  and  safety  technical  guidance and  field
        manuals for Individuals involved in response actions.

     0  Development of  staff to conduct short term toxlcological tests  at spe-
        cific sites and  augmentation  of HHS data  systems  to  include information
        on specific chemicals.

UNITED STATES COAST GUARD

1983 Program Request

     A total of  $1,514,800 is requested  for1 this  agency  in  the following areas:

     0  Personnel  costs  and  safety  equipment  in  support  of USCG  initiated
        actions.

     °  Response training costs  for USCG personnel.

     0  Staff costs for upgrading of capabilities at the national  Response Center.
                                     SF-58

-------
     e  Upgrading  of  field data  systems  in  support  of USCG  Initiated  response
        actions.
DEPARTMENT OF JUSTICE
1983 P rogram Request
     A total of 52,100,000 is  requested for ongoing litigation activities  by the
Land and  Natural   Resources  Division  in  support  of  EPA  enforcement  cases.
NATIONAL OCEANOGRAPHIC AMD ATMOSPHERIC ADHIHISTRATION (NOAA)
1983 Program Request
     A total of 3365,000  is  requested for equipment  to  support natural  resource
damage assessment actions Initiated by EPA.
                                       SF-59

-------
                                                             SUPERFUHD

                                                      USC6 Oil Pollution Fund

                                                    ACTUAL    JANUARY     HftRCH     CURRENT   ESTIMATE INCREASE +
                                                     1981     ESTIMATE   ESTIMATE   ESTIMATE    1983   DECREASE -
                                                                1982       1982       1962            1983 VS 1982
               PROGRAM
                                                             (DOLLARS IN THOUSANDS)
•fl
USCG Oil Pollution Fund
 Hazardous Substance Response
 Trust Fund

TOTAL:
 Hazardous Substance Response
 Trust Fund
               USCG 011 Pollution
               Fund
                        TOTAL
$6,742.9



$6,742.9


$6,742.9

-------
                                    S'JPERFUND

                          Coast Guard Oil  Pollution Fund

Budget Request

     No funds are requested for this activity In 1983.
     Section 221(b)(3)  of The  Comprehensive  Environmental  Response,  Compensa-
tion and Liability  Act of 1980  (CERCLA)  required that  one  half of the  balance
remaining in the Coast Guard's Oil Pollution Fund  at  the time  CERCLA  was enacted
be transferred to the Hazardous  Substance  Response Trust Fund.  Accordingly,  a
total of 56,742,900 was transferred in February of 1981.

COAST GUARD OIL POLLUTION FUND
1-981 Accomplishments

     In 1981 a total of $6,742,900 was  obligated  for this activity.   These funds
were used to  support field  activities  at abandoned  and  uncontrolled sites  and
hazardous substance spills.

1962Program

     Resources to undertake this activity  in  1982 are contained in the Hazardous
Substance Response Trust Fund.

1983 Program

     Resources to undertake  this activity  In  1983 will be  contained  in  the Haz-
ardous Substance Response Trust Fund.
                                      SF-61

-------
Page Intentionally Blank

-------
Special Analyses
      SECTION TAB

-------
Page Intentionally Blank

-------
                                       ENVIRONMENTAL PROTECTION AGENCY
                                               SPECIAL ANALYSES
                                                   Contents

                                                                                                      Page
EPA Organization Chart	;	       Sft-2
EPA Regional Offices - Locations			       SA-3
Summary of Resources	.	       SA-4
Workyears and Budget Authority, By Media and Appropriation, 1982	       SA-7
Workyears and Budget Authority, By Media and Appropriation, 1983.......	       SA-8
Total Funds obligated, 1982	       5A-9
Total Funds obligated, 1983			       SA-11
Positions by Grade and Average Employment	       SA-13
Classification by Object:
     Research and Devel opment	       SA-17
     Abatement, Control and Compllance	       SA-19
     Sal artes and Expenses	.....	       SA-24
     Buildings and Facilities	       SA-32
     Scientific Activities Overseas...	       SA-34
     Regulatory Council	       SA-35
     Hazardous Substance Response Trust Fund	       SA-36

-------
US ENVfflONMEMIAL PKOItCTKM AOENCV

Ofnc
_n«MM«i
AOWINIS
DEPUIVAOW

1 f I i
OFHCEOF 1 1 w*i» • i "sssssag" | «,»« »«»., j
"?Hf3'JK?2UI 1 I mm . I «*»» I WAim 1
lAMJUOOH | L "WIH | UIHIMIION | |


5 ,
AUOCMII ADNMIHIIAKM
FOB F

I. Off ICf W Alfl^NO^I
'• • 	 ••••
_ OFftCf QF AlflOUAHTV
EOWIROl
~ WHSEAgAfCMEMf ANO
orf ice or
*- HADf Af KM PHOOIIAttl

M

AttatAia wMmniAian j <
kUBS)A»le€S I ft!

1 OFFICE OF rcSf KWCS
AND fOXIC CUMIMKtS
J OFFKiOf
| KniCIDC FROOHAW
OFFICfof

ISSMIAM1 AOWNiRlflAlfm
FOR

aiMillV AKUflANC£
IMMf At CNOWFIEIIMII 1
ANO uetuffHoar j
6FFKF. OF iUVHHm-
" MEKtAtFftQCiSSEftAHD
J OFFKIOF
"I HCAlIHSFtfABCB

jflEflfl I i i 1 I
I MEQH^I 1 i i RiQWW H I i H6QIONMI I 1 H(fl«ON JV I 8EOWN ₯ 1 I HiOK»IVi i BEQS»* VH
i eO§ION 1 1 f«»VOflK 1 1 Ftm.AOEtHHA| 1 A1LANIA 1 ClHCAWl 1 1 DAtfAS 1 KANSAS CIIV
ntOKM vm Beaton n
BCHVtN SANFfUWCiSCO
HEQION 91
SFATtLF

-------
                                           ENVIRONMENTAL PROTECTION AGENCY

                                                       REGIONS
                                                 Locations and States
Region I    Headquarters, Boston, Hassachusetts
            Connecticut, Maine, Massachusetts,
            Hew Hampshire, Rhode Island, Vermont

Region II   Headquarters. New York, New York
            Hew Jersey, Hew York, Puerto RICO
            Virgin Islands

Region III  Headquarters, Philadelphia, Pennsylvania
            del aware, Maryland, Pennsylvanla,
            Virginia, West Virginia, District of
            Columbia

Region IV   Headquarters, Atianta, Georgla
            Alabama, Florida, Georgia, Kentucky,
            Mississippi, North Carolina, South
            Carolina, Tennessee
Region V    Headquarters, Chicago, Illinois
            Illinois, Indiana, Michigan
            Minnesota, Ohio, Wisconsin
Region VI    Headquarters,  Pallas,  Texas
             Arkansas, New Mexico,  Texas,
             Oklahoma, Louisiana

Region VII   Headquarters,  Kansas City, Missouri
             lowa, Kansas,  Missouri,  Nebraska
Region VIM  Headquarters, Denver, Col pradp
             Colorado,  Montana,  North Dakota,
             South Dakota, Utah, Wyoming
Region IX    Headquarters, San Francisco,  California
             Arizona, California, Hawaii,  Nevada,
             American Samoa, Guam, Trust Territories
             of Pacific Islands, Northern  Mariana
             Islands

Region X     Headquarters, Seattle, Washington
             Alaska, Idaho, Oregon, Washington

-------
                                             ENVIRONMENTAL PROTECTION AGENCY

                                                  Summary of Resources
                                                 (dollars In thousands)
Salaries and Expenses
  Budget Authority...	
  Obligations	
  Outlays	
  Permanent Full-time Horkyears...
  Total Workyears	

Abatement, Control  and Compliance
  Budget Author!ty.,..V...........
  Obi 1 gallons,	
  Outlays.....	
  Permanent Ful 1 -time Horkyears -.-..
  Total Workyears	

Research and Development
  Budget Author1ty	
  Ob 11ga 11 on s	
  Outlays............,*....,....«*

Scientific Activities Overseas
  Budget Authority.	
  Obi 1 gallons	
  Ou tl ays	

Buildings and Facilities
  Budget Authon ty................
  Obiigatlons	
  Ou tl ay s.	,	
                                                    Actual
                                                     1981
$561,693.9
 549,030.2
 543,377.8
  10,377.2
  12,641.0
 534,794.0
 522,513.2
 559,390.2
       • » »
      34.2
 250,485.7
 198,606.9
 247,008.2
     162.0
   1,156.7
   4,115,0
   3,104.4
   1,454.5
                  Current
                  Estimate
                    1982
$555,105.7
 555,105.7
 597,512.0
   9,259.2
  11,509.2
 372,969.7
 395,250.0
 453,435.0
 154,315.6
 188,509.0
 206,464.0
     805,0
   1,300.0
   3,621.0
   4,837.0
   3,537.0
                   Estimate
                     1983
$538,113.2
 538,113.2
 548,869.0
   8,069.8
   9,821.0
 311,575.0
 320,408,0
 387,165.0
 108,703.8
 130,260.0
 165,648.0
     700.0
   1,200.0
   3,000.0
   3,864.0
   3,559.0
                  Increase +
                  Decrease -
                1983 vs. 1982
-$16,992.5
 -16,992.5
 -48,643.0
  -1,189.4
  -1,688.2
 -61,394.7
 -74,842.0
 -66,270.0
 -45,611.8
 -58,249.0
 -40,816.0
    -10S.O
    -100.0
    -621.0
    -973.0
     +22.0

-------
 Construction Grants
   Budget Authorlty	
   Obi i gattons	
   Outlays	

 Hazardous Substance Response
 Tryst Fumf
   Budget Author)ty..................
   Dbl 1 gatlons	
   Outlays.	
   Permanent  Full-time Workyears	
   Total  Horkyears	

 Operations,  Research and Facilities
   Obi 1gatlons.......................
   Ou tl ays	

 Revolving Fund
   Obligations	
   Ou tl ays	

 Trust Funds
   Budget £uthor1 ty	
   Obi1gatlons.	
   Outlays	

 Reimbursements
   Obligations..	
.   Permanent  Full-time Horkyears....<
   Total  Horkyears.	
                                                   Actual
                                                    1981
$1,604,837.0
 3,941,567.1
 3,881,172.7
    74,742.9
    40,283.1
     8,038.7
        67.3
        75.1
       589.1
     2,257.6
       501.0
       -63.0
        12.0
         3.0
         2.3
    21,269.5
        54.6
        62.9
                       Current
                      Estimate
                        1982
$2,400,000.0
 3,409,458.0
 4,050,000.0
   190,000.0
   190,000.0
   117,743.0
       503.0
       584.0
     1,442.0
     2,000.0
       700.0
       100.0
        25.0
        20.0
    30,000.0
        58.8
        67.8
                       Estimate
                         1983
$2,400,000.0
 2,400,000.0
 3,350,000.0
   230,000.0
   230,000.0
   188,000.0
       516.4
       592.2
       500.0
       700.0
       100.0
        25.0
        20.0
    30,000.0
        58.8
        67.8
                     Increase +
                     Decrease -
                   1983 vs. 1982
-1,009,458.0
  -700,000.0
   +40,000.0
   +40,000.0
   +70,257.0
       +13.4
        +8.2
    -1,442.0
    -1,500.0

-------
>
             Enforcement
               outlays,
             Regulatory Council
                tidget Autnorl^yT.............
               ObiIgallons...................
               Ou tl ays	
               Permanent Full-time Workyears.
               Total  Morkyears...	
             Payment to the Hazardous Substance
             Response trust fund
Budget Authority.
Obligations	
Outlays..	
             TotalI, EnvlroflBenta'1 Protection Agency
               Budget Autnority...................
               Ob-1 Igatfons.	
               Outlays	.....	.	
               Permanent Full-time Workyears......
               Total  Workyears	
                                                                Actual
                                                                 1981
                                                3,189.9
                                                2,500.0
                                                2,412.2
                                                2,254.8
                                                   10.0
                                                   24.1
(9,000.0)
(9,000.0)
                                           $3,031,180.5
                                            5,280j041.7
                                            5.249,240.4
                                               10,509.1
                                               If,837.5
                                                                 Current
                                                                 Estimate
                                                                   1982
                   3,088.0
                     613.0
(26,600.0)
126,600.0)
(26,600.0)
              $3,676,012.0
               4,776,131.7
               5,435,812.0
                   9.821.0
                  12.1-61.0
                                   Estimate
                                     1983
(44,000.0)
(44.000.0)
(44,000.0)
              $3.591,392.0
               3,654,070.2
               4,645.061.0
                   8,645.0
                  10,481.0
                                       Increase +
                                       Decrease -
                                      1983 vs.  1982
                                        -3,088.0
                                          -613.0
(+17,400.0)
(+17,400.0)
(+17,400.0)
                     -$84,620.0
                   -1,122,061.5
                     -790,751.0
                       -1,176.0
                       -1,680.0

-------
                                             ENVIRONMENTAL PROTECTION AGENCY

                                                     1982 Resources
                                               By Media and Appropriation
                                                 (dollars In thousands)
Air	
Water Quality.,	
Drinking Water	
Hazardous Waste	
Pesticides	
Radiation..............
Noise	
Interdisciplinary......
Toxic Substances	
Energy....	
Management and Support.
     Subtotal,
Buildings and Facilities..........
Reimbursements	
Hazardous Substance Response
  Trust Fund	
Payment to the Hazardous Substance
  Response Trust Fund	
     Subtotal,
Construction Grants,

     Total...	
Salaries
Permanent
Full-time
Morkyears
1 ,642.0
2,246.3
499.4
609.5
744.6
149.3
25.2
196.4
686.5
131.9
2,328.1
9,259.2
• * *
• -* *
• * *
* * •
9,259.2
» * *
9,259,2
* Expenses


Amount
$77,517.8
105,011.4
24,269.7
29,200.9
31,238.4
8,291 .1
1 ,802.1
9,791.3
35,703.4
11,221.8
221,057.8
$555,105.7
* • •
• * *
...
» * •
$555,105.7
• • *
$555,105.7
Abatement,
Control 8
Conpl 1 ance
Amount
$112,193,0
110,530.5
40,989.9
56,480,9
22,220.4
1 ,394.7
208.5
4,216.5
24,735.3
...
...
$372,969.7
« * •
* * •
...
• * •
$372,969.7
* • •
$372,969.7

Research 1
Development
Mount
$30,051,1
21 ,254.8
18,571.5
21,546.3
279.3
692.9
• « »
3,710.1
16,939.1
41,270.5
* • *
$154,315.6
* » •
9 * *
...
• * *
$154,315.6
...
$154.315.6
Total
Permanent
Full-time
Horkyears
1,642.0
2,246.3
499.4
609.5
744.6
149.3
25.2
196.4
686.5
131 .9
2,328.1
9,259.2
• • «
58.8
503.0
• • •
9,821 .0
...
9,821.0


Amount
$219,761 ,9
236,796.7
83,831.1
107,228.1
53,738.1
10,378.7
2,010.6
17,717.9
77,377.8
52,492.3
221,057.8
$1,082,391.0
3,621.0
...
190,000.0
(26,600.0)
1,276,012.0
2,400,000.0
$3,676,012.0

-------
                                                    ENVIRONMENTAL PROTECTION AGENCY

                                                             1983 Resources
                                                       By Media and Appropriation
                                                         (dollars In thousands)
CD
Air..,	.-.	
Mater Quality	
Drinking Hater	
Hazardous Waste	
Pesticides.	
Radiation.	
Noise-.....-	
Interdisciplinary	
Toxic Substances........
Energy.........	
Management and Support.
                Subtotal,
           Buildings and Facilities.......
           Reimbursements.»	
           Hazardous Substance Response
             Trust Fund	
           Payment to the Hazardous
             Substance Response Trust Fund
                Subtotal	

           Construction Grants.
Salaries
Permanent
Full-time
Workyears
1,333.2
1 ,849.5
455.5
557.0
660.9
135.1
*-* •
310.3
607.7
61.8
2,098.8
8,069.8
...
...
* * •
8,069.8
...
& Expenses
Amount
$67,171.9
92.084.7
24,515.9
31 ,700.4
28,139.4
7,917.8
15,437.6
33,852.3
7,019.4
230,273.8
$538,113.2
• • •
* * •
* 9 •
$538,113.2
...
Abatement,
Control &
Compliance
Amount
$92,800.8
85,029.3
31,775.9
53,926.1
20,534.4
2,195.7
2,709.8
22,603.0
* * »
• * *
$311,575.0
» * *
* * *
* «•*
* * »
$311,575.0
* • *
Research 4
Development
. Amount
$24,080.6
8,851 .7
13,458.3
17,717.2
2,108.2
237.6
2,590.7
12,148.7
27,510.8
• * *
$108,703.8
* * *
• * *
• * *
» • *
$108,703.8
» * *
Total
Permanent
Full -time
Iterkyears
1,333.2
1 ,849.5
455.5
557.0
660.9
135.1
310.3
607.7
61.8
2,098.8
8,069.8
» * *
58.8
516.4
• * •
8,645.0
6 • B
Amount
$184,053.3
185,965.7
69,750.1
103,343.7
50,782.0
10,351.1
20,738.1
68,604.0
34,530.2
230,273.8
$958,392.0
3,000.0
• **
230,000.0
(44,000.0)
1,191,392.0
2,400,000.0
                Total,
                                     8,069.8  $538,113.2   $311,575.0
$108,703.8
8,645.0   $3,591,392.0

-------
1/1
>
I
                                                         ENVIRONMENTAL PROTECTION AGENCY


                                                           Total  Funds Obligated, 1982

                                                            (In  thousands of dollars)
Research and Development

Hater Qua! 1 ty . . . , 	 	


Pesticides... 	 . ....

Interdi sci pi 1 nary 	 	 	


Abatement, Control and Compliance

Mater Qua! 1 ty 	 	 	
DM nM ng Water 	 	
Hazardous Waste 	 	 	

Radiation. 	 	
Nol s*> 	 	
Interdi sdpl inary. 	 	 	 	 	

Salaries and Expenses
	 Kir.'-'.'... .'.".".".': .'..".".'...'. ,';V.".'. . .... " "
Water Quality. 	 	 	 	
Drinking Mater. ............... ... . .


Radiation. 	 	 ...... i ......
Nol s«= 	 	 	 	



Ma na dement and Suooort 	 .. 	
Unobligated
Balance
Budget Brought
Authority Forward
$154,315.6 +$57,768.0
30,051.1 +8,454.7
21,254.8 +12,394.0
18,571.5 +4,642.2
21,546.3 +1,942.8
279.3 +2,325.3
692,9 +386.9
3,710,1 +258,5
16,939.1 +5,149.0
41,270.5 +21,214.6
372,969.7 +32,113.0
HZ, 193.0 +4,814.8
110,530.5 +6,379.0
40,989.9 +678.6
56,480.9 +8,553.0
22,220.4 +2,550.5
1,394.7 +300.7
208.5 +831,4
4,216.5 +93.8
24,735.3 +7,911.2
555,105.7
//.bl/.H
105,011.4
24,269.7
29 ,200.9
31,238.4
8,291.1
1,802.1
9,791.3
35,703.4
11,221.8
221.057.8
Ifnobl 1 gated
Balance
Carried Total
Forward Obligations
-$23,574.6 $188,509
-3,468.8 35,037
-5,087.9 28,560
-1,832.7 21,381
-1,111.1 22,378
-906.6 1,698
-150.8 929
-100.6 3,868
-2,389.1 20,699
-8,527.0 53,968
-9,832.7 395,250
-lr4Z1.6 llb,58l>
-1,883.8 115,025
-200.2 41 ,468
-2,525.8 62,508
-1,101.3 23,669
-89.5 1 ,605
-245.0 794
-28.6 4,281
-2,336.9 30,309
555,105
77, 5!/
105,011
24,269
29,200
31,238
8,291
1,802
9,791
35,703
11,221
221,057
.0
.0
.9
.0
.0
.0
.0
.0
.0
.1
.0
.
-------

Buildings and Facilities
Scientific Activities Overseas
Construction Grants
Operations, Research and Facilities
Hazardous Substance Response Trust Fund
Total... 	 	 	 	 	 	
Budget
Authority
3,621.0
• 0 *
2, 400, MO. 0
» * *
190,000.0
$3.676.012.0
Unobligated
Balance
Brought
Forward
+2,306.0
+3,143.0
+1,009,458.0
+1,442.0
+34,460.0
+$1.140.690.0
Unobligated
Balance
Carried
Forward
-1,090.0
-2,338.0
• » a
* • •
-34,460.0
-$71,295.3
Total
Obligations
4,837.0
805.0
3,409,458.0
1,442.0
190,000.0
$4.745,406.7

-------
ENVIRONMENTAL PROTECTION AGENCY

  Total Funds Obligated, 1983
    (thousands of dollars)
Unobl 1 gated
Balance
Budget Brought
Authority Forward
Research and Development

Hater Quality. 	 	 	 	 . .




Iflterdl sclpllnary. , 	 	


Abatement, Control and Compliance

Mater Qual 1 ty . .-. 	
Drl nklng Water .....................
Hazardous Waste. 	 	 	


Noise.. 	 	 	 	

Toxic Substances. 	 	
Salaries and Expenses




Pesticides.. 	 	 	 	 	
Radiation. 	 	
Noise 	 	 	 » 	

Toxic Substances. 	 	 	

Management and Support 	
$108
24
8
13
17
2
2
12
27
311
92
65
31
53
20
2
2
22
538
67
92
24
31
28
7
15
33
7
230
,703.8 +$23,574.6
,080.6 +3,468.8
,851.7 +5,087.9
,458.3 +1,832.7
,717.2 +1,111.1
,108.2 +906.6
237.6 +150.8
,590.7 +100.6
,148.7 +2,389.1
,510.8 +8,527.0
,575.0 +9,832.7
,800.8 +1,421.6
,029.3 +1,883.8
,775.9 +200.2
,926.1 +2,525.8
,534.4 +1,101.3
,195.7 +89.5
+245.0
,709.8 +28.6
,603.0 +2,336.9
,113.2
,171.9
,084.7
,515.9
,700.4
,139.4
,917.8
,43?! 6 !
,852.3
,019.4
.273.8
Unobligated
Balance
Carried Total
Forward Obligations
-$2,018.4 $130,260.0
-308.4 27,241.0
-598.6 13,341.0
15,291.0
-471.3 18,357.0
-22.8 2,992.0
-3.4 385.0
-2.3 2,689.0
-46.8 14,491.0
-564.8 35,473.0
-999.7 320,408.0
-24.3 94,198.1
-44.8 86,868.3
31,976.1
-101.3 56,350.6
-496.1 21,139.6
2,285.2
-205.0 40.0
2,738.4
-128.2 24,811.7
538,113.2
b/,i/i.y
92,084.7
24,515.9
31,700.4
28,139.4
7,917.8
!.' 15, 437 '.6
** 33 ,852 • 3
7,019.4
230,273.8

-------
                                                        Budget
                                                      Authority
                   Unobl1 gated
                      Balance
                      Brought
                      Forward
                  Unobligated
                    Balance
                    Carried
                    Forward
                 Total
              Obligations
Buildings and Facilities
    3.000.0
   ,090.0
-226.0
3,864.0
Scientific Activities Overseas
                     +2,338.0
                   -1,638.0
                    700.0
Construction Grants
2,400.000.0      42.400,000.0
               -2,400.000.0
              2.400.000.0
Operatlons, Research and Facl11t1es
Hazardous Substance Response Trust Fund
  230,000.0
•i:

-------
                                      ENVIRONMENTAL PROTECTION AGENCY
Grades

Executive Level II..
Executive Level III.
Executive Level IV,.
Executive Level V...

        Subtotal,,..

ES-6...		
ES-5........	,..
ES-4...	
ES-3...	
ES-2		
ES-1	

        Subtotal....

GS-16.,	
6S/GM-15	
6S/GH-14	
GS/GH-13		.
GS-12..	1	
SS-11...............
GS-10		
GS-9.	
GS-8.....	
GS-7	
GS-6	
GS-5	
GS-4	
6S-3...	
GS-2....	.	...
GS-1	

        Subtotal.,,.
                                           SALARIES AND EXPENSES

                                 Positions By Grade and Average Employment
 Actual
  1981
    8
   30
   96
   32
   28
   24
  218

   10
  549
1,127
1,733
1,871
1,143
   62
  760
  180
  719
  S29
  653
  327
   77
    7
    1
Current
Estimate
  1982

    1
    1
    8
    1
   11

    8
   30
   96
   32
   28
   24
  218

   10
  492
1,007
1,568
1,652
1,021
   55
  697
  166
  659
  473
  585
  282
   69
    7
    1
Estimate
   1983

     1
     1
     8
     1
    11

     8
    30
    96
    32
    28
    24
   218

    10
   424
   870
 1,237
 1,576
   886
    49
   582
   150
   542
   407
   512
   255
    63
     5
     1
9,748
8,744
 7,569

-------
                                                                       Current
                                                      Actual            Estimate           estimate
Grades                                                 1981               1982                 1983

Positions established by act of
  July 1, 1974 (42 U.S.C. 207):
   Assistant Surgeon General, $36,072 to
    $50,160..........	.-.	
   Director grade, $26.736 to $46,188	»	..           46                 42                 37
   Senior grade, $21,394 to $37,680	          101                 88                 79
   Full grade, $18,024 to $31,512...............           79                 69                 65
   Senior assistant grade, $16,740 to $27,252...           45                 40                 37
   Assistant grade, $14,604 to $20,173	           2	1                  1

        Subtotal...........		          273                 240                219

Positions established by act of
  November 16, 1977 (42 U.S.C. 201) compensation
  for which Is not to exceed the maximum rate
  payable for a GS-18	.	..           30	30 	30

Ungraded...		.	......          TOD                 75                 82

   Total permanent positions...	       10,378               9,318               8,129

-------
                                      ENVIRONMENTAL PROTECTION AGENCY

                                          U.S. REGULATORY COUNCIL

                                  Postlon By Grade and Average Employment
Grades
Actual
 1981
Current
Estimate
  1982
Estimate
   1983
GS/GH-15.
GS-12....
5S-10....
GS-9.....
GS-8.,...
   Total pennanent positions.
   11

-------
                                      ENVIRONMENTAL PROTECTION AGENCY

                                  HAZARDOUS SUBSTANCE RESPONSE TRUST FUND

                                 Pos1tlons By Grade and Average Employment


                                                                       Current
                                                      Actual           Estimate           Estimate
Grades                                                 1981              1982               1983

ES-4	           2                 4                   4
ES-1.,..	           1                 I                   2
        Subtotal
GS/GH-15 ........ . ....................... . ......          18                40                  41
GS/GH-14....... ......... ...... ..... . ...... .....          23                51                  52
GS/GM-13 ....... . ........ . .......... . ..... . .....          40                87                  89
GS-12 .................... . ................. ....          58               126                 130
GS-11 ........ *-. ....... .... ....... . ----- ...... ...          34                74                  76
GS-10... ................ * ......................           2                 4                   5
GS-9. ........... ......... ........... ...... ........ ...          13                29                  29
GS-8.... ............. ......... ..... ....... .....           5                11                  11
GS-7 ............... ...... ............... . ......           9                20                  20
GS-6 ......... . -------- ... ............. ......... ,.           24                   5
GS-5 ................ ... ..... .... ..... . ...... .....          12                26                  27
GS-4 ...........................................           9                20                  20
GS-3 _____ ....... ----- .... ...... , ...... ..... ......           12                   2
        Subtotal	         226               494                 507

Positions established by act of
  July 1, 1974 (42 U.S.C. 207h
   Director grade, $26,736 to $46,188		.          22                   2
   Senior assistant grade, $16,740 to $27,252...          1	T	     1

        Subtotal	          33                   3

        Total Permanent positions.	        232               503                 516

-------
    RESEARCH AND DEVELOPMENT

   Classification by Objects
Includes Direct Obligations  Only
   (In thousands of dollars)

22 Transportation of things.... 	 	 	 	
23. 2 Communications, utilities, and other rent... 	 	



31 Equipment 	 	 	 	 	 	

41 Grants, subsidies, and contributions 	 	
Total other objects. 	 	 	 	 	 	 	 	 	

EXPLANATION OF INCREASES AND DECREASES TO OBJECT CLASSIFICAT1
Actual
1981
Other Services 	 	 	 	 	 $130,631 .0
Changes to this object class Include:
Congressional reduction to meet appropriation



Adjustment for Increase In carryover...... 	
Actual
1981
$13.0
13.0
123.3
130.631. 'o
76.0
14.0
67,736.6
$198.606.9
$198,606.9
ONS
January
Estimate
19B2
$161,150.0
Current
Estimate
19B2
$116,68 .0
71,823.0
$188,509.0
$188,509.0
March
Estimate
1982
Estimate
1983
• •
$70,867.0
59,393.0
$130,260.0
$130,260.0
Current increase +
Estimate Estimate Decrease -
1982 1983 1983 vs. 1982
$116,686.0 $116,686.0 $70,667.0 -$45,819.0
-$963.6
-8,670.5
+120.0
-18,571.6
+28,085.7
                                                     -0-

-------
    The decrease of $45S819.0 In the 1983 request reflects
a major reduction in contracted research  in  the  energy
program, wltfi smaller reductions In other programs.
                                                              January      March      Current                 Increase +
                                                    Actual     Estimate    Estimate    Estimate    Estimate    Decrease -
                                                    1981        1982        1982        1982        1983     1983 vs.  1982
Grants, subsidies, and contributions............. $67,736.6    $76,069.0   $71,823.0   $71.823.0  $59,393.0    -$12,430.0

    Changes to this object class Include;

    Congressional  reduction to meet appropriation
     levels	-.	                                                 -$6,272.9
    Transfer authorl ty	                                                    -536.4
    Congressional  add-on for Great Lakes....	                                                  +1,380.0
    September 12% reduction.»	                                                  -4,304.4
    Adjustment for Increase In carryover	                                                  +9,733.7

                                                                                                    -0-
    The decrease of $12,430.0 In the 1983  request
reflects substantial reductions 1n the water quality,
drinking water, and toxic substances programs,  with
smaller reductions to other programs.

-------
                                                  ABATEMENT. CONTROL AND COMPLIANCE
•>
i
                                                     Classification by Objects
                                                   Includes Direct Obligations Only
                                                     (In thousands of dollars)
                                                                                        Actual
                                                                                         1981
                                                                                         Current
                                                                                         Estimate
                                                                                           1962
Estimate
  1983
Personnel Services	         $709.8

Other Objects:

  21  Travel  and transportation of persons.	           $6.6          $75.0
  22  Transportation of things	            3.3
23.2  Communications, utilities, and other rent.	          148.8            ...            ...
  24  Printing and reproduction	          231.0
  25  Other services		      224,332.3      147,980.0     $132,481.0
  26  Supplies and materials...	           12.7
  3?  Equipment	          516.0
  32  Lands and structures....	."	            4.0            ...            ...
  41  Grants, subsidies, and contributions			      296,548.7      247.195.0      187,927.0

           Total  other objects	     $521.803.4     $395,250.0     $320,408.0

           Total  obligations	,	     $522,513.2     $395,250.0     $320,408.0

Ppsltlon Data:

  Average salary, GS positions	        $28,209            ...            ...
  Average grade,  GS positions	           10.6            ...

EXPLANATION 0£ INCREASES AND DjCREASES TO OBJECT  CLASS IF rCAnONS

                                                              January    March    Current              Increase +
                                                       Actual  Estimate  Estimate  Estimate  Estimate   Decrease -
                                                        1981     1982      1982      1982      1983    1983 vs. 1982

Personnel services......	     $709.8  $2,760.0

  There Is no change In the 1982 estimate and no
request for 1983.

-------
ro
o
            Travel  and transportation of persons.	

                There Is no change  fn the 1982 estimate.

                The decrease of $75.0 reflects the reduced
            need for travel associated  with the underground
            Injection control  program.
            Transportation of things.
    There Is no change In the 1982  estimate  and no
request for 1983.
            Communications,  utilities,  and other rent.
                There 1s no change In the 1982 estimate and no
            request for 1983.
            Printing and reproduction.
                There Is no change in the 1982 estimate  and no
            request for 1983.
                                                                            January    March    Current
                                                                   Actual   Estimate  Estimate  Estimate
                                                                    1981      1982      1982      1982
                                                         $6.6    $85.0
                                                       Actual
                                                        1981

                                                       $146.8
                                                                   Actual
                                                                    1981
$75.0
$75.0
                                                                January    March    Current
                                                       Actual   Estimate  Estimate  Estimate
                                                        1981      1982      1982      1982

                                                         $6.6     $5.0
                                                                            January    Harch    Current
                                                                            Estimate  Estimate  Estimate
                                                                              1982      1982      1S82
                                                                January    March    Current
                                                                Estimate  Estimate  Estimate
                                                                  1982      1962      1982
                                                       $231.0    $25.0
                                                                                               Estimate
                                                                                                 1983
                                                                                                           Estimate
                                                                                                             1983
                   Estimate
                     1983
 Increase +
 Decrease -
1983 vs. 1982

   -$75.0
                               Increase '+
                               Decrease -
                              1983 vs. 1982
                     Increase  +
                     Decrease  -
                    1983 vs. 1982
                               Increase +
                   Estimate    Decrease -
                     1983      1983 vs. 1982

-------
                                                                  January     March      Current                 Increase +
                                                         Actual    Estimate   Estimate    Estimate    Estimate    Decrease -,
                                                          1981       1982       1982        1982        1983     1983 vs. 1982
 Other services,	,	.	     $224,299.2  $224,495.0 $178,628.0  $147,980.0  $132,481.0    -15,499.0

    The decrease of $30,648.0 In the 1982 current
estimate results front the following:

    Congressional  reduction to meet appropriation
levels.	                                       -$11,179.1
    Transfer authority	,.                                         -2,280.3
    September 12% reduction....	                                        -45,706.0


    Congressionally restored programs to 12$
reduction:
    Chesapeake Bay.............	                                           +200.0
    Great Lakes.	.,.......,,....„.,                                           +673.4
    Stationary source enforcement*	                           .              +2.03S.9
    Emergency response.	                                           +525.0
    Energy review and permitting		                                         +1,413.8


    Congressional  add-ons:
    Great Lakes	                                           +300.0
    Chesapeake Bay	,.                                           +130.0

    Adjustment for Increase 1n carryover	..,.                           ,             +23,239.3
                                                                                        -$30,648.0
    The decrease of $15,499.0 In the 1983 request
reflects a reduced contracting level for programs.

-------
f
ro
ro

Supplies and materials....... 	 	 	
Therr Is no change in the 1982 estimate and no
request for 1983.


There Is no change in the 1982 estimate and no
request for 1983.

Lands and structures.......... 	 	 	
• There Is no change In the 1982 estimate and no
request for 1983.

Grants, subsidies, and contributions 	 	 	 $2!
The Increase of $6,958.0 1n the 1982 current
estimate results from the following:
Congressional reduction to meet appropriation
1 evel s 	 , 	 	 	 	
Actual
1981
$12.7

Actual
1981
$516.0

Actual
1981
$4.0

Actual
1981
> 6, 548. 7


January
Estimate
1982


January
Estimate
1982


January
Estimate
1982


January
Estimate
1982
$269,714.0


March
Estimate
1982


March
Estimate
1982


March
Estimate
1982


March
Estimate
1982
$240,237.0


Current
Estimate
1982


Current
Estimate
1982


Current
Estimate
1982


Current
Estimate
1982
$247,195.0

-$464.0
Estimate
1983


Estimate
1983


Estimate
1983


Estimate
1983
$187,927.0


Increase +
Decrease -
1983 vs. 1982


Increase +
Decrease -
1983 vs. 1982


Increase +
Decrease -
1983 vs. 1982


Increase +
Decrease -
1983 vs. 1982
-$59,258.0



-------
                                                                           January    March    Current              Increase +
                                                                  Actual    Estimate  Estimate   Estimate  Estimate   Decrease -
                                                                   1981      1982      1982      1982      1983    1983 vs. 1982
                 September  12* reduction ..... . ........ ...........                              -$3,890.0

                 Congressional ly restored programs to 12% reduction:
                 Rural  Water Association ........ . ..............                                 +1,290.0
                 Pectlcldes certification and training ........ .                                 +1,050.0

                 Congressional add-ons;
                 Great  Lakes ..... ..... ...... . ......... .........                                 +1,200.0
                 Academic training ..... ........ . ....... ........                                 +1,000.0
                 Manpower planning and  training... ..... .. ......                                 +2,625.0
                 Rural  Water Association. ..... ..... . ...........                                   +323.0
                 Clean  Lakes .................. .......... .......                                 +9,000.0
w               Chesapeake Bay.... .. ................ . ........ .                                   *870,0
*•
£               Adjustment to reflect  revised estimate. ... ......                               -6,046.0
                                                                                             +$6,958.0
                 The  decrease of $59,268.0 In 1983 reflects lower
             State -grant and demonstration grant levels, and a
             smaller  reduction  to other grants.

-------
                                               SALARIES AND  EXPENSES

                                            Classification by Objects
                                        Includes  Direct Obligations Only
                                            (in thousands of dollars]
                                                                                Current
                                                                    Actual      Estimate       Estimate
                                                                     1981         1982           1983
Personnel Services.	,	               $375,853,9    $361,471.7     $331,621.1

Other Objects:

  21  Travel and transportation of persons.........                $12,724.1     $16,565.0      $14,276.1
  22  Transportation of things	                  1,903.4       2,026.0        1,884.7
23.1  Standard level user charges	                 21,729.0      23,871.0       26,837.0
23.2  Communications, utilities,  and other rent	                 42,737.9      43,147.2       44,508.6
  24  Printing and reproduction.	                  6,114.1       7,301.9        7,872.1
  25  Other services	                 61,627.2      78,217.7       87,130.3
  26  Supplies wtd materials	                 12,530.3      13,415.9       13,139.6
  31  Equipment,	.	                 12,346.5       8,539.3       10,839.7
  32  Lands and structures	                 :    44.5
  41  Grants, subsidies, and contributions	                  1,343.9         550.0            4.0
  42  Insurance claims and indemnities...	               	75.4    __in_          ...

           Total other objects...	               $173,176.3    $193,634.0     $206,492.1

           Total obligations.....	.,	               $549,030.2    $555,105.7     $538,113.2

Position Data:

  Average salary, GS positions..	,	          -        $28,209       $29,563         29,563
  Average grade, GS positions......................                     10.6          10.6           10.6

-------
       EXPLANATION OF INCREASES AND DECREASES TO OBJECT  CLASSIFICATIONS
                                                                         January     March       Current                Increase +
                                                               Actual     Estimate   Estimate     Estimate   Estimate    Decrease -
                                                                1981        1982       1982         1982       1983     1983 vs. 1982
       Personnel .^services.	....	  $375,853.9  $390,661.4  $357,173.5  $361,471.7  $331,621.1  -$29,850.6

           The increase of  $4,298.2 In the 1982 current
       estimate results from the  following:

           Congressional reduction taken to meet appropriation
             levels and reduced workyear celling	                                   -$10,249.3
           Congressional  add-on for personnel  costs to
             cover review of AWT  projects....»	                                       +350.0
           Congressional add-on for manpower planning
             and training	                                     +1,478.0
t/t          Congressional reduction to OANR Program Management.                                        -80.0
?"          Transfer authority transferred Into  PC8B...	                                     +1,005.1
S          Congressional reduct1on,_to Office of Legislation...                                       -129.0
           Net Increase from other object classes for PCSB..,.                                    +11,923.4
                                                                                                 +$4,298.2
           The decrease of $29,850.6 In the 1983 request  re-
       sults from a reduction of 1,688.2 authorized work years.

-------
r
en
                                                      Actual
                                                       1981
                                                                          January
                                                                          Estimate
                                                                            1982
 March
Estimate
 1982
Current
Estimate
   1982
Estimate
  1983
 Increase +
 Decrease -
1983 vs. 1982
Travel and transportation of persons	   $12,724,1   $19,731.0   $16,565.0   $16,565.0   $14,276.1   -$2.288.9


    Changes to this object class Include:

    Congressional  reduction taken to meet  appro-
     priation levels and reduced workyear
     celling.....	,	                                        -$441.fi
    Transfer authority	,	                                         +397.4
    Congressional  reduction to Office of Press
     Services...			                                           -9.2
    Congressional  add-on for Great Lakes	                                          4-53.4

                                                                                            -0-

    The decrease of 2,288.9 In the 1983 request
reflects the reduction-In workyear ceiling.
                                                                January      March     Current                 Increase +
                                                      Actual     Estimate    Estimate   Estimate    Estimate    Decrease -
                                                       1981        1982       1982	1982       1983     1983 vs.  1982

Transportation of  things...	    $1,903.4    $2,315.7    $2,306.9    $2,026.0    $1,884.7     -$141.3

    The decrease of $280.9 in the 1982 current
estimate results from the following:

    Congressional  reduction taken to meet  appro-
     priation levels and reduced workyear
     celling	.....»-.-	                                        -$431.4
    Transfer authority,...	                                         +126.0
    Congressional  add-on for Great Lakes	                                           +7.0
    Adjustment to  cover 1982 estimate	                                          +17.5
                                                                                         -$280.9

-------
Standard level user charges.
    The decrease of $1,531.0 In the 1982 current
estimate reflects revised projections  of SLUG and
direct lease costs.

    The Increase of $2,966.0 In the 1983 request
covers the cost of GSA set price increases.
            January    March    Current                Increase +
   Actual    Estimate  Estimate  Estimate   Estimate    Decrease -
    1981      1982      1982      1982       1983     1983 vs. 1982

$21,729.0  $28,253.0 $25,402.0 $23,871.0  $26,837.0    +$2,966,0
                                                                    January    March     Current
                                                           Actual   Estimate  Estimate  Estimate
                                                            19B1      1982      1982      1982
                                          Estimate
                                            1983
 Increase +
 Decrease -
1983 vs.  1982
Communications, utilities, and other rent	      $42,737.9  $38,012.2 $36,W2.6 $43,147.2  $44,508.6    +$1,361.4

    The Increase of $7,054.6 In the 1982  current
estimate results from the following:

    Congressional reduction taken to meet
     appropriation levels and reduced workyear
     ceiHrw		                                     -$3,433.8
    Transfer authorl ty	                                        +800.8
    Congressional reduction to Office of  Press
     Services.	                                          -6.8
    Congressional add-on for Great Lakes..	                                        +128.8
    Congressional reduction to Office of
     Legislation	                                          -1.0
    Adjustment to cover 1982 estimate	                                      +9,566.6
                                                                                       +$7,054.6
    The increase of $1,361.4 In the 1983 request
supports Increasing costs for rental  of equipment,
telephones, and the continually rising cost  of
utilities.

-------
                                                              January     March     Current              Increase +
                                                     Actual   Estimate   Estimate   Estimate  Estimate   Decrease -
                                                       1981      1982       1982       1982      1983    1983 VS.  1982
Printing and reproduction.	   $6,114.1  $12,658.6  $10,875.7  $7,301.9  $7,872.1     +.$570.2

    The decrease of $3,573.8 In the 1982  current
estimate results from the following:

    Congressional reduction taken to meet
     appropriation levels and reduced workyear
     ce111 ng	                                  -$2,697,6
    Transfer authority	                                     +501.0
    Congressional reduction to Office of  Press
     Services	.	                                      -46.0
    Congressional reduction to OANR Program
     Management.	                                     -170.0
    Congressional add-on for Great Lakes....	                                       +5.0
    Adjustments to cover decreased estimate for
     1982	,	                                   -1,166.2
                                                                                    	
     The Increase of $570.2 In the 1983 request  will
support Increase 1n printing and reproduction costs
and Federal Register changes for the pesticides,  toxic
substances, water quality, radiation and program support
programs.
                                                                                   -$3,573.8

-------
                                                                  January      March      Current              Increase +
                                                         Actual    Estimate    Estimate    Estimate  Estimate   Decrease -
                                                          1981       1982        1982        1982      1983    1983 vs. 1982
Other services..........		   $61,627.2   $118,440.8  $100,366.1  $78,217.7  $87,130.3    +$8,912,6

    The decrease of $22,148.4 to the 1982 current
estimate results formt he following:

    Congressional  reduction taken to meet appro-
     priation levels	.		                                    -$20,147.0
    Tranfer Authority..	                                     +11,307.6
    Congressional  reduction to Office of
     Press Services	                                         -30.0
    Congressional  reduction to PIP Contracting
     studies	                                        -500.0
    Congressional  add-on  for Great Lakes
    New estimate of costs based on 1981  actual                                              +405.3
     data	,	                                     -13,184._3

                                                                                        -$22,148.4


    The Increase of $8,921.6 in the 1983 request
results-from the following:

    Increase to automatic data processing contracts..                                                +$8,222.4
    Increase to provide contract dollars for Inter-
     agency agreements that support Regional  plan-
     ning, evaluation and analysis	                                                   +563.3
    Increase to provide contract dollars for policy
     analysis and an integrated approach to the
     regulation of toxic  programs..	                                                 +4,903.0
    Offsetting decreases  due mainly to a reduced  need
     for administrative and maintenance service con-
     tracts that support  the operation of facilities,
     equipment, training, publication of notices, and
     other related services.	»	                                                 -4,767.1

                                                                                                    +$8,921.6

-------
                                                               January
                                                      Actual   Estimate
                                                       1981      1982
 March
Estimate
  1982
Current
Estimate
  1982
Cstlnate
  1983
 Increase +
 Decrease -
1983 vs. 1982
Supplies and materials	,	.-,	     $12,530.3  $16,639.9  $16,027.7  $13,415.9  $13,139.6     -$276.3

    The decrease of $2,611.8 In the 1982  current
estimate results form the following:

    Congressional reduction taken to Beet
     appropriation levels and reduced workyear
     celling	                                      -$1,848.9
    Transfer authority	,	                                         +740.3
    Congressional add-on for Great Lakes.	                                         +296.5
    Mew estimate based on 1981  actual  costs.....                                       -1,799.7

                                                                                     -$2,611.8

    The decrease of $276.3 tn the 1983 request
reflects the reduction In authorized work years.


                                                               January     March     Current               Increase +
                                                      Actual   Estimate   Estimate   Estimate   Estimate   Decrease -
                                                        1981      1982       1982       1982       1983    1983 vs.  1982

Equipment	     $12,346.5  $18,540.4  $17,759.5  $8,539.3  $10,839.7   +$2,300.4


    The reduction of $9,220,2 to the 1982 current
estimate results from the following:

    Congressional reduction taken to meet appro-
     priation levels and reduced work year
     celling	                                     -$4,874.9
    Transfer author 1 ty	                                        +845.5

-------
                                                                 January    March    Current              Increase +
                                                         Actual   Estimate   Estimate  Estimate  Estimate   Decrease -
                                                          1981      1982      1982      1982      1983    1983 vs. 1982
    Congressional reduction of Office of Press
     Services.	
    Congressional add-on for Great Lakes	
    Adjustment to cover decreased estimated For
     1982	
                                 -2.0
                                +98.0

                             -5.286.8

                            -$9,220.2
    The increase of $2,300.4 to the 1983 request
reflects planned purchases in the air, water
quality, drinking water, hazardous waste,
pesticides and toxic substances programs.
Lands and structures.
  Actual
   1981

   $44.5
                                                                 January
                                                                 Estimate
                                                                   1982
 March    Current
Estimate  Estimate
...... 1982 _     1982

 $200.0
    The reduction of $200.0 to the 1982 current
estimate results from the Congressional directive
that no projects over $20 be funded under this
appropriation.
                                                        Actual
                                                         1981
          January
          Estimate
            1982
 March
Estimate
  1982
Current
Estimate
  1982
          Estimate
            1983
           Increase +
           Decrease -
          1983 vs.  1982
Estimate
  1983
•Grants, subsidies, and contributions.
$1,343.9   $365.0
            $550.0    $4.0
 Increase +
 Decrease -
1983 vs.  1982

   -$546.0
    The increase of $550.0 in the 1982 current
estimate reflects a grant to the State of
California  for audit services in the Office of
the Inspector General.

-------
                                                  BUILDINGS AND FACILITIES
                                                 Classification  by Objects
                                             Includes Direct Obligations Only
                                                 (In thousands of dollars)
                                                                             Actual
                                                                              1981
                      Current
                      Estimate
                        1982
                      Estimate
                        1983
21  Travel  and transportation of persons.
24  Printing and reproduction	
25  Other services	
31  Equipment.	.	
32  Lands and structures	
          Total obligations.
                       $23.0       $40.0

                     2,222,"6       864.'6

                     2,592.'6      2,960.6
         $3,104.4   $4,837.0    $3,864.0
EXPLAHATIOH OFINCREASES AND DECREASES TO OBJECT CLASSIFICATIONS
                                                                January    March    Current              Increase +
                                                        Actual   Estimate  Estimate  Estimate  Estimate   Decrease -
                                                        1981       1982      1982      1982      1983    1983 vs. 1982
Travel and transpojta11 on of persons.	   $20.4

    There Is no change In the 1982 estimate.

    The Increase of $17.0 in 1983 reflects additional
need In this object class.
$23.0
$23.0     $23.0
$40.0
t$17.0

-------
t/t
3=
CO
to
           Equipment.
               There is no change  In  the  1982 estimate and no
           request for 1983.
           Lands and structures.
               There Is no change in the  1982 estimate.

               The Increase of $368.0 reflects the additional
           need In this object class.
           Printing and reproduction.
               There 1s no change In the 1982  estimate and no
           request for 1983.
        January    March    Current              Increase +
Actual  Estimate  Estimate  Estimate   Estimate    Decrease -
 1981     1982      1982      1982     _Ji?3_  1983 ys. 1982

 $89.5
        January    March    Current             Increase +
Actual  Estimate  Estimate  Estimate   Estimate   Decrease -
 1981     1982      1982      1982      1983    1983 vs. 1982

$959.4  $5,123.0  $2,592.0  $2,592.0   $2,960.0     +$368.0
        January    March    Current              Increase +
Actual  Estimate  Estimate  Estimate   Estimate    Decrease -
 1981     1982      1982      1982      1983    1983jfS. 1982

 $2.4      ...       ...       ...
                                                                         January    March    Current              Increase +
                                                                 Actual  Estimate  Estimate  Estimate  Estimate   Decrease -
                                                                  1981     1982      1982      1982      1983    1983 vs. 1982
           Other services	-..		,	.,	-..	 $2,032,7  $1,221.0  $2,222.0  $2,222.0   $864.0

               There Is no change In 1982 estimate.

               The decrease of $1,358.0 In the  1983  estimate
           reflects reduced carryover for this  object class.
                                                -$1,358.0

-------
                                              SCIENTIFIC ACTIVITIES OVERSEAS
                                                 Classification by Objects
                                              Includes Direct Obligations Only
                                                 (In thousands of dollars)
  21  Travel and transportation of persons,
  25  Other services...	
Actual
 1981

 $16,5
 145.5
Current
Estimate
  19B2

  $20.0
  785.0
           Total  obligations	  $162.0    $805.0
Estimate
  T983

 $620.0
  680.0

 $700.0
EXPLANATION OF INCREASES AND DECREASES  TO OBJECT CLASSIFICATIONS
                                                          Actual
                                                           1981

Travel and transportation of persons	,.   $16.5

    The decrease $5.0 in the 1982 current estimate
reflects reduced need in this object class.  There
Is no change In the estimate for 1983.
Other services	   $145.5

    The Increase of $5.0 1n the 1982 current  estimate
reflects an increased need In this object class.

    The reduction of $105.0 in the 1983 estimate reflects
the decrease 1n carryover funds anticipated for 1983 and
the fact that no new funds are available  In either 1982
or 1983.
         January
         Estimate
           1982

           $25.0
                                                                   January
                                                          Actual   Estimate
                                                           1981      1982
          $780.0
            March
           Estimate
             1982

             $25.0
            Harch
           Estimate
             T982

            $780.0
           Current
           Estimate
             1982

             $20,0
                               Current
                               Estimate
                                1982
Estimate
  1983

 $20.0
 Increase +
 Decrease -
1983 vs. 1982
                                Increase +
                      Estimate   Decrease -
                        1983    1983 vs. 1982
             $785.0    $680.0
             -$105.0

-------
                                                 U.S.  REGULATORY COUNCIL*

                                                Classification by Objects
                                            Includes Direct Obligations Only
                                                (in thousands of dollars)
Personnel Services	

Other Objects:

  21  Travel and transportation of persons......
  22  Transportation of things	
23.2  Communications, utilities, and other rent.
  24  Printing and reproduction	
  25  Other services.	
  26  Supplies and materials..	
  31  Equipment.	..	

          Total other objects	

          Total obligations.	
  Actual
   1981

  $950.2
    16.0
    16.0
   276.0
   419.0
   718.0
    15.0
     2.0

$1,462.0

$2,412.2
                                                                                      Current
                                                                                      Estimate
                                                                                        1982
Estimate
  1983
       This appropriation was deleted during the March  revisions.   Support  for the Regulatory Information Service
       Center will continue in the Office of the Administrator in  the  Salaries and Expenses appropriation.

-------
                                                      HAZARDOUS SUBSTANCE RESPONSE TRUST FUND

                                                             Classification by Objects
                                                         Includes Direct Obligations Only
                                                             (In thousands of dollars)

                                                                                               Current
                                                                                     Actual    Estimate     Estimate
                                                                                      1981       1982         1983

                    Personnel  Services	,			..       $2,424.3    $19,718.2    $26,962.5

                    Other Objects

                    21   Travel  and Transportation of persons	         $302.9     $1,800.0     $2,722.3
                    22   Transportation of things	            9.6        281.7        262.3
                  23.2   Communications, utilities, and other rent	          670.2      3.367.7      3,653.9
                    24   Printing and reproduction	            6.6        419.2        522.8
g                   25   Other  services		.	       31,211.7    129,883.3    158,866-0
w                   26   Supplies and materials..	          273.7      1,143.0        949.5
01                   31   Equipment		        2,617.7      4,603.3      2,304.9
                    32   Lands  and structures	          ...        3,505.0
                    41   Grants, subsidies, and contributions...,	        2,766.4     25,278.6     33,755.8
                              Total other objects....	-..      $37,858.8   $170,281.8   $203,037.5

                              Total obligations	      $40,283.1   $190,000.0   $230,000.0

                    Position  Data:

                     Average salary, GS positions...		      $28,209
                     Average grade, GS postlons	         10.6

-------
Personnel services	   $2,424.3

     The decrease of $5,059.8  In  the  1982 current
estimate reflects the revised  need  In personnel
costs.

     The Increase of $7,244.3  In  the  1983 request
reflects the Increased work year celling and
allocations to other agencies  In  the  amount of
$4,926.0.
Travel and transportation of persons.
     There Is no change In the 1982 current
estimate.

     The Increase of $922.3 In the 1983 request
reflects the Increased workyear celling and
allocations to other agencies In  the  amount
of $592.0.
Actual
19S1
$2,424.3
Actual
1981
$302.9
Actual
1981
January
Estimate
1982
$26,885.0
January
Estimate
1982
$2,600.0
January
Estimate
1982
March
Estimate
1982
$24,778.0
March
Estimate
1982
$1,800.0
March
Estimate
1982
Current
Estimate
1982
$19.718.2
Current
Estimate
1982
$1,800.0
Current
Estimate
1982
Estimate
1983
$26,962.5
Estimate
1983
$2,722.3
Estimate
1983
Increase +
Decrease -
1983 vs. 1982
H7.244.3
Increase +
Decrease -
1983 vs. 1982
+$922.3
Increase +
Decrease -
1983 vs. 1982
Transportation of th1 ngs.
     The decrease of $89.3 In the  1982 current
estimate reflects the reduced need In this object
class.

     The decrease of $19.4 In the  1983 request
reflects reduced need In this object class.
$9.6
$566.0
$371.0
$281.7
$262.3
-$19.4

-------

Printing and reproduction. 	 	
The decrease of $215.8 In the 1982 current
estimate reflects the reduced need for printing
and reproduction.
The Increase of $103.6 1n the 1983 request
reflects Increased costs for printing in the
Federal Register and allocations to other
agencies In the amount of $50.0.
Standard level user charges. 	 	 	 	
Actual
1981
$6.6
Actual
1981
$600.0
January
Estimate
1982
$529.0
January
Estimate
1982
$2.000.0
March
Estimate
1982
$635.0
March
Estimate
1982
$2.000.0
Current
Estimate
1982
$419.2
Current
Estimate
1982
$1.347.0
Estimate
1983
$522.8
Estimate
1983
$1.453.0
Increase +
Decrease -
1983 vs. 1982
+$103.6
Increase +
Decrease -
1983 vs. 1982
+$106.0
     The decrease of  $653.0 In the 1982 current
estimate reflects the reduced need In this object
class.

     The Increase of  $106.0 In the 1983 request
reflects the Increased workyear celling.

-------
                                                              January      March      Current                 Increase +
                                                   Actual     Estimate    Estimate    Estimate     Estimate     Decrease -
                                                    1981        1982        1982        1982        1983     1983 vs. 1982
Communications, utilities,  and other rent....	     $70.0     $1,409.0    $2,981.0    $2,981.0    $2,200.9   .   +$180.2

     The decrease of $960.3 in the 1982 current
estimate reflects the reduced need in this object
class.

     The Increase of $180.2 in the 1983 request
reflects the Increasing costs for  rentals and
utilities, along with allocations  to other
agencies In the amount of $154.0.

                                                              January      March      Current                Increase +
                                                   Actual     Estimate    Estimate    Estimate     Estimate    Decrease -
                                                    1981        1982        1982        1982        1983      1983 vs. 1982
Other services	    $31,211.7   $207,527.0  $152,860.0  $129,883.3  $158,866.0  +$28,982.7

     The decrease of $22,976.7 in the 1982
current estimate reflects reprogrammlng In
the amount of $18,629.6 to fund state grants
and cooperative agreements, and the Congres-
sional reduction taken to meet appropriation
levels in the amount of $4,347.1.

     The Increase of $28,982.7 in the 1983
request reflects an expanded contractual pro-
gram for hazardous substance response actions,
and includes $1,004.0 for allocations to other
agencies.

-------
g
                                                             Actual
                                                              1981
            January
            Estimate
              1982
 March
Estimate
  1982
Current
Estimate
  1982
Estimate
  1983
         Suppl1 es and material s.
  $273.7     $1,342.0
   $763.0    $1,143.0    $949.5
 Increase +
 Decrease -
1983 vs.  1982

   -$193.5
              The Increase of $380.0 In the 1982 current
         estimate reflects the expected need In this
         object class.

              The decrease of $193.5 In the 1983 request
         reflects the reduced need for supplies and
         materials.  The request Includes $24.0 In
         allocations to other agencies.
                                                             Actual
                                                              1981
            January
            Estimate
              1982
 March
Estimate
  1982
Current
Estimate
  1982
Estimate
  1983
 Increase +
 Decrease -
1983 vs. 1982
         Equipment.
              The decrease of $3,708.7 In the 1982
         current estimate reflects the Congressional
         reduction taken to meet appropriation levels
         In the -amount of $3,400.0 and an additional
         decrease of $308.7 to fund other object
         classes.

              The decrease of $2,298.4 In the 1983
         request reflects the reduced need In this
         object class.  The request includes $522.0
         In allocations to other agencies.
$2,617.7     $5,382.0    $8,312.0    $4,603.3   $2,304.9    -$2,298.4

-------
Lands and structures.
     The decrease of $1,995.0 In the 1982
current estimate reflects  the Congressional
reduction taken to meet appropriation levels
In the amount of $2,000.0  and an Increase of
$5.0 from other object classes.

     There Is no request for 1983.
Grants, subsidies, and contributions.
     The Increase of $25,278.6 In the 1982
current estimate reflects an Increase of
$25,531.5 to fund state grants, cooperative
agreements, and research grants.  It also
Includes a Congressional reduction to met
appropriation levels In the amount of $252.9.

     The Increase of $8,477.2 In the 1983
request reflects an Increase of $9,000.0 for
state grants and cooperative agreements,
and a decrease of $1,122.8 for research
grants.
                                                   Actual
                                                    1981
            January
            Estimate
              1982
 March
Estimate
  1982
Current
Estimate
  1982
Estimate
  1903
             $1,760.0    $5,500.0    $3,i05.0
 Increase +
 Decrease •
1983 vs. 1982

 -$3,505.0
 Actual
  1981

$2,766.4
                                                              January
                                                              Estimate
                                                                1982
 March
Estimate
  1982
Current
Estimate
  1982
Estimate
  1983
 Increase +
 Decrease -
1983 vs. 1982
            $25,278.6  $33,755.8    +$8,477.2

-------
Page Intentionally Blank

-------
Page Intentionally Blank

-------
Page Intentionally Blank

-------