AGENCY
 <$
^£D S7^

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents

                                                                             Page

SUBJECT INDEX                                                                7
SUMMARY                                                                      S-1


AIR                                                                          A-l

    RESEARCH & DEVELOPMENT
       Oxidants. ... .......... ...... . .......................................  A~$
       Hazardous Air Pollutants.. ....... ..... .......... ... ........ ..........  A- 22
       Mobi le Sources .............................. ...... ................ . .  A-32
       Gases 4 Particles..... ...... . ......................... . .............  A-44
    ABATEMENT 4 CONTROL
       Air Quality & Stationary Source Planning & Standards ....... .........  A-59
          Emission Standards & Technology Assessment..... ....... . ..........  A- 62
          Pollutant Strategies & Air Standards Development..... ...... . .....  A-63
          State Program Guidelines & Regulations Development ........ .......  A- 64
       Mobile Source A1r Pollution Control 4 Fuel Economy. ............... ...  A-66
          Emission Standards, Technical Assessment  S Characterization ......  A- 68
          Testing, Technical & Administrative Support. .... .................  A-70
          Em1 ss1 ons 4 Fuel Economy Compl 1 ance . . ............ . ...............  A-71
          Mobile Source Standards 4 Guidelines. ---- , .......... ...... ..... ...  A-72
       State Programs Resource Assistance.. ....... ..... .................. ..  A-73
          Control  Agency Resource Supplementation (105  Grants) ........... ..  A-74
          Training.. ....... .. ............... . ...... . .................. .....  A-76
       Air Quality Management Implementation.. ..... . ................ .......  A-78
       Trends Monitoring 4 Progress Assessment .............................  A-82
          Ambient A1r Quality Monitoring...... ..... ...... ..................  A-83
          Air Quality 4 Emissions Data Analysis & Progress Assessment ......  A-84
    ENFORCEMENT
       Stati onary Source Enforcement. ......... ..................... ........  A-87
          Stationary Source Enforcement .......... ... ............... ...... . .  A-88
          Stationary Source Enforcement - Legal & Enforcement  Counsel ......  A-91
       Mobile Source Enforcement ........ . ...... .......... ................ ...  A- 92


WATER^UAILITY                                                                WQ-1

    RESEARCH A DEVELOPMENT
       Water Quality Research ...................... ........... .. ...........  WQ-9
       Municipal Wastewater . . . .......... .... ....................... ........  HQ-21
       Industrl al  Wastewater ............ .; ................ ....... ...........  WQ-30
    ABATEMENT & CONTROL
       Water Quality State Programs Management ........... . .......... .......  WQ-39
          State Programs Management. ........ ....... ........... .... .........  WQ-41
          Great Lakes Program ................. . ............... ........... . .  WQ-46
          Chesapeake Bay Water Quality Study ........... ....................  WQ-47
       Effluent Standards & Guidelines.. .................... .. ...... .......  WQ-50
       Grants Assl stance Program. ........ .......... ................ . ..... . .  WQ-55
          Clean Lakes Program. ....... .............. ...... .... ..............  WQ-56
          Control  Agency Resource Supplementation (Section 106) ............  HQ-57
          Training Grants (Section 104) ....... ..... ........................  WQ-59

-------
                                                                                                        i'
                                                                                                        3—•
                                                                             Page
WATER QUALITY  (cont.)

       Water Quality Strategies  Implementation	  WQ-60
          Dredge & Fill	.	  WQ-63
          Ocean Disposal Permits..	  WQ-63
          Environmental Emergency  Response &  Prevention..	  WQ-66
          Standards 4 Regulations	  WQ-67
       Water Quality Monitoring  4  Analysis...	  WQ-70
       Municipal Source Control	;..	,		  WQ-74
          Municipal Waste Treatment Facility  Construction....	,	WQ-77
          Corps of Engineers.......	  WQ-81
          Waste Treatment Operations 4 Maintenance	  WQ-82
          NEPA Compliance - Municipal Wastewater  Treatment
            Fad 11 ty Construct! on	  WQ-83
    ENFORCEMENT
       Water Qual i ty Enforcement	.....'.	,	  WQ-85
          Water Quality Enforcement		  WQ-86
          Water Quality Enforcement - Legal &  Enforcement Counsel	  WQ-89
       Water Quality Permit Issuance.	WQ-90


DRINKING WATER                                                               DW-1

    RESEARCH & DEVELOPMENT
       DM nki ng Water Research	  OW-8
    ABATEMENT & CONTROL
       Prinking Water Criteria,  Standards * Guidelines	  DW-22
       Drinking Water State Program Resource  Assistance	  DW-27
          Public Water Systems Supervision Program  Grants..................  DW-28
          Underground Injection Control Program Grants..	  DW-30
          Special Studies & Demonstrations	  DW-31
          Tra1 m" ng	,	  DV-32
       Drfnkl ng Water Management	>	  DW-33
          Public Water Systems Supervision Program  Assistance	  DW-34
          Underground Injection  Control Program.....	  DW-37
    ENFORCEMENT
          Drinking Water Enforcement	,	  DW-41


HAZARDOUS WASTE                                                              HW-1

    RESEARCH 4 DEVELOPMENT
       Hazardous Waste Research...	  HW-8
    ABATEMENT & CONTROL
       Waste Management Regulations, Guidelines and Policies	  HW-23
       F1 nanci al Assi stance	,	  HW-27
          Hazardous Waste Management Financial Assistance to States	  HW-28
          Resource Recovery Local  Financial Assistance...	  HW-30
       Waste Management Strategies Implementation	  HW-31
          Hazardous Waste Management Regulatory Strategies  Implementation..  HW-33
          Solid Waste Management Program;Imp!ementatlon	  HW-35
       Technical Assi stance.	  HW-36
          Technical  Information Development...	,	  HW-37
          Solid Waste Technology Assistance Delivery....	  HW-37
       Uncontrolled Hazardous Waste Sites	  HW-39
    ENFORCEMENT
       Hazardous Waste Enforcement	,	  HW-42
          Hazardous Waste Permit Issuance	  HW-43
          Hazardous Waste Enforcement	"...	  HW-44

-------
PESTICIDES                                                                  P-l

    RESEARCH & DEVELOPMENT
       Pestici des Research	.....	 P-7
    ABATEMENT & CONTROL
       Registration, Special Registration S Tolerances	 P-2Q
          Regi strati on	 P-22
          Special Registration.
         'To!erances	
       Generic Chemical Review 4 Special Reviews - EIS Preparation.
          Generic Chemical Review.
          Special Reviews - EIS Preparation.
       Federal 5 State Program Support.
          Pesticides Use Management.
                                                                              -24
                                                                              -25
                                                                              -27
                                                                              -29
                                                                              -31
                                                                              -33
                                                                              -34
    ENFORCEMENT
       Pestidices Enforcement.	*	  P-36
          Pesticides Enforcement	,...,.*	P-37
          Pesticides Enforcement Grants	  P-39
          Pesticides Certification & Training........	  -P-40


RADIATION                                                                    R-l

    RESEARCH 4 DEVELOPMENT
       Nonionizing Radi atiorv	  R-6
    ABATEMENT 4 CONTROL
       Radiation Criteria, Standards 4 Guidelines	  R-14
       Radiation Program Implementation	  R-l7
       Radiation Environmental Impact Assessment.....,..........,....,...*.  R-2Q


HOISE                                                                        N-l

    ABATEMENT 4 CONTROL
       Environmental Noise Strategies 4 Standards	  N-7
          Noise Standards Development	  N-7
          Noise Control Technology Assessment 4  Criteria  Development.......  N-7
       Nol se Program Implementation	  N-8


INTERDISCIPLINARY                                                            1-1

    RESEARCH 4 DEVELOPMENT
       Intermedia Program	  1-6
    ABATEMENT ft CONTROL
       Federal Agencies Compliance & NEPA Compliance..	  1-18
          NEPA Compl iance.	,	  1-19
          Federal Agencies Compliance	  1-20
          New Source EIS Preparation.	  1-20
       Accelerated Review and Permitting	  1-22
       Interdisciplinary Training Srants;.	  1-24
    ENFORCEMENT
       Enforcement Policy 4 Technical Support	  1-27
          Technical Support - Office of Legal 4  Enforcement Counsel...	  1-29
          Enforcement Policy 8 Operations..	  1-30

-------
                                                                            Page

TOXIC SUBSTANCES                                                            TS-1

    RESEARCH * DEVELOPMENT
       Chemical Testing & Assessment	 TS-7
    ABATEMENT & CONTROL
       Toxic Substances Strategies	.»	 TS-23
          Toxi cs Integrati on	,	 TS-27
          Chemical Testing	 TS-29
          Existing Chemical Review	 TS-30
          New Chemical Review	 TS-32
    ENFORCEMENT
       Toxl c Substances Enforcement.	»....,	 TS-36
          Toxic Substances Enforcement..	 TS-37
          Toxi c Substances Enforcement Grants	 TS-39


ENERGY                                                                      E-l

    RESEARCH A DEVELOPMENT
       Multl-Media Energy	,	 E-4
       Oxidants Energy.	 E-l7
       Gases 4 Particles Energy	... E-20
       Water Quality Energy	.. E-24
       Industri al Wastewater Energy.	,. E-27
       Municipal Spills Energy	 E-30


MANAGEMENT Jt SUPPORT                                                        MS-1

    PROGRAM MANAGEMENT
       Program Management..	 MS-7
          Program Management - Air, Noise & Radiation....	 MS-9
          Program Management - Mater.	,	 MS-10
          Program Management - Pesticides & Toxic Substances	 MS-10
          Program Management - Research & Development	 MS-11
          Program Management - Solid Waste & Emergency Response	 MS-12
    AGENCY MANAGEMENT
       Office of the Administrator/Executive Offices	...	 MS-14
          Immediate Office of the Administrator		,	... MS-21
          Regulatory Information Service Center....	,	MS-22
          Administrator's Representation Fund	 MS-22
          Office of Executive Secretariat	,	 MS-23
          Office of Management Services	MS-23
          Science Advisory Board	 MS-24
          Office of Legislation	 MS-25
          Office of International Activities..	 MS-E6
          Office of Civil Rights	 MS-27
          Office of Public Affairs	 MS-29
          Office of Federal Activities	 MS-30
          Office of Administrative Law Judges	MS-31
          Office of Intergovernmental Liaison	 MS-32
          Office of Small & Disadvantage^ Business  Utilization	 MS-33
          Office of Inspector General	 MS-33
       Office of Policy 4 Resource Management	MS-35
          Program Management - Policy S Resource Management	MS-38
          Office of the Comptroller	MS-38
          Program Integration Project.	 .•	 MS-39
          Office of Policy Analysis	MS-40
          Office of Standards and Regulations...'	 MS-41
          Office of Management Systems & Evaluation	,	 MS-42

-------
                                                                             Page

MANAGEMENT & SUPPORT (cont.)

       Office of Legal & Enforcement Counsel. ...... . ............ ..... ......  MS-44
          Program Management - Legal & Enforcement  Counsel... ...... ..... ...  MS-45
          General Counsel ....... ...... ..... . ......... .......... . .............  MS-46
          Regi onal Counsel . ..... ........................ . ..................  MS-47
       Office of Administration ...... ................... . ..... , ______ ........  MS-49
          Program Management -- Admf ni strati on ...... . ......... . ..... . . . . _____  MS-53
          Financial Management- Headquarters. ................ ... .......... ..  MS-54
          Contracts & Grants Management. ..... .... ....... , ..................  MS-55
          Personnel & Organization Services ........ , ............... . ..... ..  MS-57
          Facilities & Management Services......... ..... . .......... ...... ,.  MS-58
          Information Systems & Services ..... . ..................... ........  MS-6Q
   REGIONAL MANAGEMENT
       Regional Management ........ . .................... ........ .......... ..  MS-63
          Regional Management ........... ........... , ................ .......  MS-65
          Planning, Evaluation, 4 Analysis -  Regions ............ ... ....... •  MS-66
          Financial Management- Regions ..... ..............................  MS-67
          Personnel Management- Regions ..... ...... . ...... .................  MS-68
          Administrative Management - Regions ...... . ......... ......... .....  MS-69
   SUPPORT COSTS
       Support Costs ......... ..... , ..... ........... ................ . .......  MS-72
          Nationwide Support Services... ................ ....... . ......... ....  MS-74
          Headquarters Support Services. . . . . . ........... . ..... ........... . .  MS-74
          Regional Support  Services ...... .......... ...... ..................  MS-76
          ADP Support Costs ............. , .......... ............... ;........  MS-76
          P rof essi onal Trai ni ng . . , . ....... .... ....... .................. ....  MS- 7 7
          Lab Support - Research & Development.... ........... . ........ .....  MS-78
          Lab Support - Air, Noise 4 Radiation ..... . .......................  MS-78
          Lab Support - Pesticides S Toxic Substances.... ..... ........... ..  MS-79


BUILDINGS & FACILITIES                                                       BF-1
       Buildings & Facilities ....... , ........ , ......... ....... ,
          Repairs & Improvements ...... ... ..................... .............  BF-5


CONSTRUCTION GRANTS                                                          C6-1

       Construct! on Grants . .. ...... . . . .................. ..... ...............  CG-2


SUPERFUND                                                                    SF-1

   RESEARCH & DEVELOPMENT
       Hazardous Substances ............. . .......................... . .......  SF-8
   ENFORCEMENT
       Hazardous Substance Response -  Enforcement........ ....... . ...... ....  SF-1 9
          Technical Support - Office of Legal  & Enforcement Counsel ........  SF-22
          Hazardous Substance Technical Enforcement ....... ......... ...... . .  SF-23
          Hazardous Substance Legal Enforcement ............................  SF-25
   MANAGEMENT S SUPPORT
       Management & Support ............. . .......... ...... ..... ..... ...... ..  SF-28
          Hazardous Substance Financial Management - Headquarters ........ ..  SF-33
          Hazardous Substance Financial Management - Regions ........ .......  SF-33
          Hazardous Substance Administrative Management -  Headquarters.....  SF-34
          Hazardous Substance Administrative Management --Regions... .......  SF-35
          Hazardous Substance Occupatl onal Heal th S Safety - Headquarters . .  SF-36
          Hazardous Substance Support  Services - Headquarters ..............  SF-36

-------
SUPERFUND (cont.)

          Hazardous Substance Support Services -  Regions.......	  SF-37
          Hazardous Substance Laboratories 4 Facilities..	  SF-38
          Hazardous Substance Computer  Services......	,.,».  SF-38
          Hazardous Substance Legal Services - Headquarters	  SF-39
          Hazardous Substance Legal Services - Regions	  SF-39
          Hazardous Substance - Inspector General	  SF-40
          Hazardous Substance Natural Resource Claims	,	  SF-41
          Hazardous Substance - Office  of Policy  &  Resource  Management	  SF-41
   HAZARDOUS SUBSTANCE RESPONSE ACTIONS
       Hazardous Substance Response - EPA.....	  SF-44
          Hazardous Spill & Site Response	  SF-45
          Assessing 4 Replacing Natural Resources	..  SF-49
       Hazardous Substance Response- Interagency	  SF-50
          Department of Health S Human  Services	  SF-52
          United States Coast Guard	  SF-5Z
          Department of Justice..........	  SF-53
          National  Oceanographic & Atmospheric Administration	  SF-53
          Department of Interior,,.	,	  SF-54
       Hazardous Waste SI te Inventory	,.  SF-55
SPECIAL ANALYSES
SA-1

-------
                          ENVIRONMENTAL PROTECTION AGENCY

                                1984 Budget Estimate

                               Subject Index By Media


AIR                                                                         Page

  Academic Training	        A-76
  Air Quality Monitoring	        A-83
  Air Toxics.....	     A-64, A-79
  Certi fic ati on	     A-68, A-71
  Compliance Monitoring Inspections.	...	        A-88
  Control  Technology Development,	  A-17, A-53, A-62
  Emission waivers	        A-93
  Enforcement	     A-87, A-92
  Fuel Economy	     A-68, A-71
  Fuels Programs	....	,	        A-93
  Hazardous Air Pollutants: 37...	     A-25, A-63
  Health Effects Institute	        A-42
  I n d p o r Ai r	        A-2 7
  Inspection and Maintenance Program........	     A-74, A-80
  In-use Emission Factors..	     A-63, A-70
  Mobile Source Alternative Compliance Program.......	        A-71
  Motor Vehicle Emissions Laboratory	        A-70
  National Ambient Air Quality Standards (NAAQS)	        A-63
  National Crop Loss Assessment network (NCLAN)..	     A-19, A-54
  National Emission Standards for Hazardous Air Pollutants (NESHAPs)        A-62
  National Institute for Building Sciences (NIBS)	        A-28
  New Source Performance Standards (NSPS)..,	»...»,:........        A-6Z
  Prevention of Significant Deterioration	     A-64, A-79
  Recall...	        A-93
  Regional Programs...	,	     A-79, A-83
  Selective Enforcement Audits	        A-93
  State Grants		        A-74
  State Implementation Plans (SIPS)	     A-64, A-79
  Stationary Source Enforcement.............	        A-87
  Tampering and Fuel Switching..............	        A-93
  Training courses.	,	     A-76, A-88


WATER QUALITY

   Academic Training	        WQ-59
   Advanced Wastewater Treatment Reviews....	     WQ-77, WQ-79
   Aquatic Monitoring Methods....	WQ-15, WQ-34, WQ-71
   Chesapeake Bay Program..	.	        WQ-47
   Clean Lakes	,	        WQ-56
   Combined Sewer Overflow.	        WQ-79
   Control Technpl ogy Oevel opment	     WQ-27, WQ-36
   Corps of Engineers	        V/Q-81
   Ef.fluent Guidelines.	'.	,	        WQ-51
   Enforcement.	        WQ-86
   Great Lakes Program:                                                     , •
     Research and Development...	     WQ-9, WQ-20
     Abatement, Control and Compliance	        WQ-46
   Grosse He Laboratory...	        WQ-20
   Innovative and Alternative Technologies..	     WQ-27, WQ-77
   International  Pollution Control Agreements	         WQ-63
   Marine Outfalls - Section 301{h)	..;	     HQ-80, WQ-92
   Ocean Disposal	     WQ-18, WQ-63

-------
                               Subject Index by Media

                                    (Continued)
WATER QUALITY  (continued)
   Operations and Maintenance	        WQ-82
   Operator Training.	     WQ-46, WQ-78
   Pretreatrnent	        WQ-92
   Sludge Management	     WQ-27, WQ-78
   State Grants..	,	        WQ-55
   Toxic Pollutants Research...	     WQ-16, WQ-30
   Water Quality Based Approach	     WQ-18, WQ-68
   Water Quality Permit Issuance	        WQ-91
   "Vtetl ands" 404	        WQ-63


DRINKINGWATER

   Academic Training	        DW-32
   Drinking Water Treatment Technology	        DW-17
   Enforcement	;	        OW-42
   Ground Hater Activities	     DW-24, DW-37
   Ground Water Research Activities	        OW-19
   Heal th E ff ec ts	,	        DW-15
   National Rural  Water Association	        DW-31
   Public Water Systems Supervision	,	 DW-24, DW-28, DW-34
   Qua! ity Assurance	        OW-14
   Small Systems Engineering Research.....	        DW-18
   State Grants.	,	,	        DW-28
   Underground Injection Control	 DW-24, DW-30, DW-37


HAZARDOUS WASTES
   Academic Training	        HW-26
   Burning of Hazardous Waste in Boilers	     HW-25, HW-17
   Compliance Inspections..	...	     HW-29, HW-44
   Enforcement	        HW-43
   Ground Water Monitoring	 HW-13, HW-20, HW-25
   Hazardous Spills Research....	        HW-17
   Incineration.	     HW-16, HW-26
   Innovative/Al ternative Techno! ogies	        HW-18
   Landfills		 HW-16, HW-18, HW-25
   Moni tori ng Methods	        HU-13
   Permitting	     HW-4, HW-24,
                                                                         HW-28, HW-34
   Phosphate Rock Study	        HW-19
   Post-Cl osure Moni tori ng	        HW-13
   Quality Assurance...	        HW-14
   Regulation Development	     HW-3, HW-24
   Regulatory Reform..	     HW-4, HW-25
   State Authorizations	     HW-3, HW-24,
                                                                         HW-28, HW-33
   State Grants	        HW-28
   Support to Permitting and Enforcement	,	 HW-13, HW-17, HW-20
   Surface Impoundments	        HW-19
   3012 Grants	        SF-56
   Waste Characterization....	 HW-12, HW-13, HW-15

-------
                               Subject Index By Media

                                    (Continued)

PESTICIDES.                                                                  page

   Backlog Elimination	  P-22, P-24, P-25
   Biological Control Agents/Pesticides	      P-14, P-16
   Certification and Training....	         P-40
   Colorado Enforcement Program	..	         P-39
   Emergency Exemptions	         P-24
   Enforcement.	         P-37
   National  Enforcement Investigation Center (NEIC)...	         P-38
   Nebraska Enforcement Program	         P-40
   Pesticide Enforcement Grants	         P-39
   Registration Fees..	         P-4
   Registration Standards	.	         P-30
   Reregi stration	         P-29
   State Grants...	         P-39
   State Registrations	         P-24
   Tolerance Fees	         P-26
   Toxaphene Regulation	,	         P-38


RADIATION

   Airborne Radionudide Standards	,	        R-15
   Environmental  Radiation Ambient Monitoring System	        R-21
   Health Effects Research	        R-ll
   Nevada Nuclear Test Site..	        R-10
   Ocean Disposal of Radioactive Materials....'	        R-15
   Radiological Emergency Response Plans	        R-18
   Uranium Mill Tailing Standards	     R-16, R-18


INTERDISCIPLINARY
   Academic Training	         1-25
   Accelerated Review and Permitting	         1-23
   Case Referral s	         1-30
   Criminal Investigations.	         1-31
   Economic Benefits Research	         1-11
   Enforcement	         1-28
   Enforcement Operations...	         1-30
   Enforcement Pol icy	         1-30
   Evi dence Audi ts	         1-29
   Exploratory Research....	...	         1-10
   Federal Agencies Compliance	     WQ-87, 1-20
   Li tigation	         1-30
   National Enforcement  Investigation Center (NEIC).....	         1-29
   NEPA Compliance Program Consolidated	         1-19
   Office of Legal and Enforcement Counsel	         1-28
   Qual 1 ty Assurance	;.	         1-30
   Technical Support	         1-29


TOXIC SUBSTANCES

   Asbestos Regul ation	         TS-32
   Chemical Substances Information Network  (CSIN)	         TS-27
   Compliance Monitoring Outputs..	         TS-5
   Dioxon Control	.	         TS-38

-------
                               Subject Index By Media

                                    (Continued)
TOXIC SUBSTANCES  (Continued)
   Enforcement	,	,	        TS-36
   Interagency Testing Committee (ITC).	        TS-29
   National Center for Toxlcological Research...	        TS-21
   Polychlorinated Biphenynls (PCB) Disposal,	     TS-31, TS-38
   Stratospheric Modif ication	        TS-2Q
   Test Guidelines	     TS-14, TS-17
   Toxic/Chemical Integration Efforts	        T.S-27


ENERGY

   Acid Rain	        E-8
   Advanced Utility Simulation Model (AUSM) vs. Industrial Models...        E-9
   Limestone Injection Multi-stage Burner (LIMB)	        E-14
   Synthetic Fuel s	,	,	        E-13


MANAGEMENT AND SUPPORT

   Automated Data Processing Consolidation (ADPC)	,	        MS-5
   Computer Center Costs	        MS-77
   Construction Grant Final Audit Backlog Reduced	.	        MS-34
   Defensive L1 tigation	        MS-46
   International Pollution Control Agreements..	        MS-26
   Legal Advice.,	,		        MS-46
   Legislation/Congressional Liaison Activities........	        MS-25
   Mail Services .- Cost Containment...,	,	k	        MS-75
   Management Systems Integrated	        MS-42
   Managing for Environmental  Results.	.	        MS-42
   Obligation/Outlay Forecasting System	        «IS-38
   Office of Legal and Enforcement Counsel (OLEC)	        MS-45
   Regional Enforcement Management	        MS-47
   Regulatory Reform - OPRM	        HS-41
   Support Services.	        MS-72
   Suspension and Debarment - Contracts	        MS-5S
   Suspension and Oebarment - IG.	        MS-34
   Telephone - Long Distance Charges (FTS)..	        MS-74


SUPERFUND

   Cost Recovery - Superfund	        SF-21
   Emergency Response	,	,	     SF-3, SF-46
   Engineering Eva!uations.	        SF-14
   Heal th Assessments	        SF-12
   Management	        SF-32 '
   Private Party Settlements	I	        SF-21
   Qua! 1 ty Assurance	        SF-13
   RCRA Section 3012	,	        SF-S6
   Remedial Response	     SF-3, SF-46
   State Programs			     SF-3, SF-47
   Technical  Manual s	        SF-14
                                       10

-------
                          ENVIRONMENTAL PROTECTION AGENCY

                                1984 Budget Estimate

                             A1 phabeti cal .Su.bj.ect Index
Academic Training:
   A1 r	         A-76
   Water Qual ity		,	         WQ-59
   Drlnking Water	*.	         DW-32
   Hazardous Waste	,	         HW-26
   In terdi sc ipl i nary	,	         1-25
Acid Rain	,	         E-8
Advanced Wastewater Treatment Reviews.	         WQ-77
Advanced Utility Simulation Model  (AUSM)...,	         E-9
Airborne Radionuclide Standards	,	         R-15
Asbestos Regulation	..-,	         TS-32
Automated Data Processing Consolidation (ADPC)...	         MS-5
Burning of Hazardous Wastes in Boilers. ................. ...... ........      HW-25,  HW-17

C_

Certification and Training ............ , .............................         P-40
Chemical Substances Information Network  (CSXN). ...... ...... ..... .....         TS-27
Chesapeake Bay Program.... ......... . ............ ...... . .......... ...         UQ-47
Clean Lakes ................ . .......... . ...... . ......................         WQ-56
Combined Sewer Overflow ...... .... ............ . ...... . ................ .         WQ-79
Compliance Monitoring  Inspections -  Air..... ....... ... ...... ........         A-88
Construction Grant Final  Audit Backlog Reduced ........ . .............      WQ-78,  MS-34
Control Technology Development ......................................  A-17,  A-53, A-62,
                                                                          WQ-27,  WQ-36
Corps of Engineers........... ........... . ........ ............ .......         WQ-81
Cost Recovery - Superfund... .......... ..... .......... ...... ...... ...         SF-21
Crimi nal Investigation ..... .... ..... . ...... .........................         1-31
Dioxin Control ....... . .................................... ..........         TS-38
Dredge and Fill  (Section 404) ............ .-.. .............. ... ..... .....         WQ-63
Drinking Water Treatment Technology ............... . ......... ..... i..         DW-17

I

Ef fl uent Guidel 1 nes ........................ ...................... ...         WQ-51
Emergency Response .................... ..... .........................      WQ-66,  R-18,
                                                                          SF-3,  SF-46
Enforcement - Legal:
  Office of Legal and  Enforcement Counsel ... ....... ... ..............      1-28,  MS-45
  Enforcement Policy  and Operations ............ ....... . .............         1-30
  Criminal Investigations. . ...... . ............. . ..... ...... ...... ...         1-31
  National Enforcement Investigation  Center (HEIC).... ........... ...         1-29
  General Counsel .......... , . . ........ .............. ................         MS-46
  Regional Counsel .................... ...... ................ ........         MS-47
                                        11

-------
                                          Subject Index
                                    (Continued)


£_ (Continued)                                                               Page

Enforcement - Technical :
  A1r Stationary Source Enforcement ......... ....... . ........ ........        A-87
  Air Mobile Source Enforcement.. ......... ....... ... ........ . .......     A-87, A-92
  Drinking Water Enforcement ................ ........................        DW-42
  Hazardous Waste Enforcement.. .................. ........ ..... ..... .        HW-43
  Hazardous Waste Permit Issuance. ........ . ........... ... ..... . .....     HW-4, HW-24,
                                                                         HW-28, HW-34
  Pesticides Enforcement. . .> .......... .. . ...... ........ ......... ......        P-37
  Toxic Substances Enforcement..... .............. .. ......... . ...... .        TS-36
  Water Quality Enforcement. .......... ......................... ......        WQ-86
  Water Quality Permit Issuance.............. ..... ...... .............        WQ-91
  Superfund Enforcement.... ...... ........ . ....... ..... . ........... ..     SF-4, SF-23
Enforcement «• Program Management. ..... ... ........ ........ ......... ..        NIS-45
Environmental Radiation Ambient Monitoring System ........ ...........        R-21
Exploratory Research ...... . . ..... ...... ..... . ..... ... . . ..... . .......        1-10

F_

Federal Agencies Compliance ...... . ............... ....... ......... ...     WQ-87, 1-20

i

Great Lakes Program:
  Research and Development .......... ............. ..... . .............     WQ-9, WQ-20
  Abatement, Control and Compl iance. . . , ..................... ........        UQ-46
Grosse He Laboratory ...............................................        WQ-20
Ground Water Activities ---- . ...... ........................... , ....... DW-24, DW-37, HW-25
Ground Water Research ...... ......... ... .......... ........... ..... ...        DW-19
Hazardous Air Pollutants:  37 ...................... ......... , .......     A-25, A-63
Hazardous Spills Research.. .........................................        HW-17
Health Effects  Institute - Air ......................................        A-42
Health Effects  Research - Drinking Water..., ..... . .......... ..... ...        DW-15
Health Effects  Research - Radiation ........ . ........................        R-ll
HHS:  Superfund ............ ........ . ................................        SF-52
Incineration ...................... ____ ...................... ... .....     HW-16, HW-26
I ndoo r Ai r ...... , ........ . ....... ................ ....... ........ ....        A-27
Innovative and Alternative Technologies:
  Water Quality... ---- ................ ........... ..... ---- . .........     WQ-27, WQ-77
  Hazardous Waste ..................... , ........... ........... ....... .        HW-18
Inspection and Maintenance Program.../. ........... ..... . ............     A-74, A-8Q
Interagency Testing Committee (ITC) .............. ... ............ ....        TS-29

JL

Landfills .................. ..... . ................ , ........... ....... HW-16, HW-18, HW-25
Legislation/Congressional Liaison  Activities ..... ..... ...... .........        MS-25
Limestone Injection Multi-Stage  Burner (LIMB).. ............. , .......        E-14
                                       12

-------
                             Alphabetical Subject Index

                                    (Continued)
M
Mall Services - Cost Containment ........... . ....... . ....... .........        MS-75
Management. . . . ........ . ....... ................... ....... ... .........        MS-1
Management  Systems Integrated ........ . ........ . ........ .............        MS-42
Marine Outfalls - Section 301 (h) ............. . ...... .......... ..... .  .   WQ-80, WQ-92
Motor Vehicle Emissions Laboratory ..... . ............ ....... .........        A-70
National Ambient Air Quality Standards (NAAQS) ..... ... ........ . ---- ,        A-63
National Center for lexicological Research ................... , ......        TS-21
National Crop Loss Assessment Network (HCLAN). ..................... .     A-19, A-54
National Emission Standards for Hazardous Air Pollutants (NESHAPS)..        A-62
National Enforcement Investigation Center (NEIC):
  Interdi sci pi inary ...... .............. ...... ............. ..........        1-29
  Pesticides... ........ ...... ............... -.. ............... . ......        P-38
National Institute of Building Sciences (NIBS) ..... ........... ......        A-28
National Rural Water Association............... ........ ,. ..... ........        DH-31
Nebraska Enforcement Program.... ................... .... .............        P-40
Nevada Nuclear Test SI te. . . ....... ........... .' ...... ............... .        R-10
New Source Performance  Standards (NSPS) .......................... ...     A-62, WQ-S1
Obligation/Outlay Forecasting System ....... ... ..... ..... ............        MS-38
Ocean Disposal . ....... ..... .. ---- . ............ ..... ...... . ...... ..... WQ-13, WQ-63, R-15
Operations and Maintenance ......... . ..................... ...........     WQ-ffi, CG-4

P_

Pesticide Enforcement Grants............. ........... ................        P-39
Phosphate Rock Study ..... . ............ .... .......... ................        HW-19
Polychlorinated  Biphenynls (PCB) Disposal ---- . ..... . .............. .,     TS-31, TS-33
Polychlorinated  Biphenynls (PCS) Rules ........... . ................ ..        TS-31
Premarket Manufacture Notices (PMM) ........... ..... . . . . ..... , .......        TS-32
Prevention of Significant Deterioration ................ . ..... .......     A-64, A-79
Program Integration/Toxics Integration ............... ........ .......     TS-27, MS-39
Public Water Systems Supervision ........ ................. ..... ..... .     DW-Z8, DW-34
Resource Conservation and Recovery Act, (RCRAS 3012 .................        SF-56
Recall- Air ................... ,.. ...... . ........... ....... ........... ,        A-93
Reg1 stratlon Fees ...... . ..................... . ..... , ............. ...        P-4
Registration Standards. .... ...... . ....................... . ...... ....        P-30
Regulatory Reform .................. .,..; ...................... ........     HW-4, HW-25
                                                                         MS-41, CG-1
Remedial Response ........ . ....................... . ...... ........ ....     SF-3, SF-46

S_

Selective Enforcement Audits......... ........ ..... ................. .        A-93
Significant New Use Rules (SNURS) ...... . ....... .. ...................        TS-33
Sludge Management. ...... ..... . ...... ... ........ ... ..................     VJQ-27, WQ-78
Small Systems Engineering Research... ...... ..'. ..... . ..... ...... .....        DW-18
                                       13

-------
                             Al phabetjcal Sub j ec t I ndex

                                     (Continued)


S_  (Continued)                                                              Page

State Grants:
  A1 r ............... ........ ................... . ....................        A-74
  Water 106 ................ . ........ ..... , ...................... _____        WQ-57
  Water 205(g) ........... -. ................ ..... ................ . ----     WQ-57, CG-5
  Water 205{j) ................. . ...................... ...............     WQ-57, CG-5
  Cl ean Lake s .......... ........ ........... . . . . . ....... . .............        WQ-56
  Public Water  System  Supervision .................... ...............        DW-Z8
  Underground  Injection Control  (UIC) ..... ...... ....................        OW-30
  Hazardous Waste ................... ...................... . .........        HW-28
  RCRA Section  3012 ............ .... ............ ................ .....        SF-5.6
  Pesticides Enforcement ....... , . . ............. ........... . .........        P-39
  Pesticides Certification .................................... ......        P-40
  Special  Studies  and  Demonstrations.. ..............................        DVI-31
State Implementation Plans  (SIPS) .............. ...... .......... .....     A-64, A-79
Stationary Source  Enforcement ............. ...... ...... ......... .....        A-87
Stratospheric Modification. .... .....................................        TS-2Q
Superfund  Interagency  Funds:
  Coast Guard ....... '. ............ . . . ........... . ............... .....        SF-52
  Department of Health and  Human  Services ................. , .........        SF-52
  Department of Interior..... ....................... ... ..... ........        SF-54
  Department of Justice .............. . ..............................        SF-53
  National Oceanic and Atmospheric  Administration (NOAA).., .........        SF-53
Support Services ............... .... ................. , ....... ........        MS-72
Surface Impoundments ...... ................... ..... ..................     HW-3, HW-17
Synthetic  Fuel s ................................................ .....        E-13
Tampering  and Fuel  Switching..... .............. ..... ....... .. .......        A-93
Telephone  - Long Distance Calls  (FTS) ...............................        MS-74
Test Guidelines ......... . ........................................... TS-14, TS-17, TS-29
Tol erance  Fees ........ ........... . ..... ..... . ..... . ............... .....        P-26
Toxaphene  Regul a ti on ................ , ..................... ..........        P-38
Underground  Injection Control ....... , ..... ..... ......... . ...... *....     DW-30, DW-37
Uranium Mill Tailing Standards ...... . .......................... .....     R-16, R-18

It

Water Quality Based Approach.. ....... ..... .......... ................     WQ-18, WQ-68
                                        14

-------
Summary
   SECTION TAB

-------
Page Intentionally Blank

-------
                           ENVIRONMENTAL PROTECTION AGENCY

                                 1984 Budget Estimate

                                    Budget Summary


     The President's request  for the  Environmental  Protection  Agency's  1984  budget
totals 51,258,591,000 supported by 8,669.1 permanent workyears, including $948,591,000
and 8,049.8 permanent workyears for the Agency's operating programs, and $310,000,000
and 619.3  permanent  workyears  for  the Superfund program.   New budget  authority  in
the amount of  $2,400,000,000  is requested  for  the  municipal  waste  treatment  facil-
ities construction  program.    Including   Superfund  and  Construction  Grants,   these
totals constitute  a  decrease  of  $21,097,200  and 455.9  permanent workyears for  the
Agency as a whole in 1984.

     Major emphasis continues  on  the Superfund  and Hazardous Waste  programs.   Fund-
ing for  the  Superfund  program  increases  by $100,000,000, to $310,000,000  supported
by 619.3 permanent  workyears  in 1984.   EPA will continue  it's efforts  to  increase
the role of  States in managing response  actions and in  working  with  other Federal
agencies in the implementation of Superfund.  In  the Hazardous Waste program,  emphasis
will be placed on  increasing the direct role of States  in  the management and operations
of their  own  program;  increasing  permitting  efforts  of hazardous  waste  disposal
facilities; and continuing to  establish a sound  regulatory base.

     EPA will  continue  to  improve its enforcement  effort  supported by  a  13 percent
increase in  enforcement  resources.   Hazardous Waste  enforcement  will  emphasize  in-
spection of waste  handlers which pose severe threats to public health and the environ-
ment.  Superfund will add  emphasis  on  "its efforts to recover Federal  response costs
and encourage  privately  financed cleanup  of hazardous waste sites.  The Agency will
continue to foftus the criminal  investigations on  instances where  criminal  violations
are suspected.

     The research  and  development  program  will  focus  its  1984  program  toward
strengthening EPA's commitment  to  improving the scientific basis  upon  which  regula-
tory policies  are  formulated  and Implemented.   Resources 1n .1.984 will  be  directed
to those activities  which  are  necessary  to meet  our legislative mandates and which
provide the  scientific  basis  of our regulatory  program.  Our  request  for  research
activities in  1984  includes  $205,509,000 supported  by   1,211.6 permanent  workyears,
a reduction of 23,335,700.

     Grants to State and local  goverments are at  a  level  of  $172,771,300 a  reduction
of $60,359,000  from  1983,  This  reduction  was  possible  because  of;   the  Agency's
efforts over the last two years to eliminate program  duplication in its grant process,
simplified administrative  requirements,  reduced regulatory demands,  and alternative
funding sources.

     A summary  of  budget authority  for  EPA's  six  appropriation  accounts  is  as
follows:

                       EP_A_'_s  Request by AppropriationAccount

                                            1983                 1984
                                      Current Estimate      Budget Authority

Salaries & Expenses	        $548,613,200          $540,389,000
Abatement, Control & Compliance..        369,075,000           293,933,000
Research & Development	         119,000,000           111,669,000
Buildings S Facilities	           3,000,000             2.600,000

    Operating Programs  Subtotal..      $1,039,688,2'00          $948,591,000

Construction Grants.	     $2,430,000,000        $2,400,000,000
Hazardous Substance Response
  Trust Fund....	        210,000,000           310,000.000

        Total	      $3,679,688,200        $3,658,591,000
                                           S-l

-------
     The following  briefly  describes  the  content  of  each  appropriation  and  the
changes requested within each from the Agency's current 1983 estimates.

Sal ari es and Expenses

     EPA requests  a decrease  of $8,224,200  for  its  Salaries  and Expenses  approp^
riation which finances  salaries  and related costs associated with  administering  the
programs within  the Environmental  Protection  Agency.    It  incorporates  all  costs
exclusive of  grant programs  and program-specific contractual  agreements.   The  de^
crease reflects  the reduced  workyear levels.   Additional  workyears  in  1984  will
support States  1n  developing a  water quality-based  approach  to pollution  control,
Improve toxic  substances  compliance monitoring,  and increase  support   for  enforce-
ment policy and operations.

Abatement,Control  and Compliance

     The Abatei*ient, Control and  Compliance  appropriation  finances  contracts,  grants,
and cooperative agreements for pollution abatement, control and compliance activities.
EPA requests a decrease of $75,142,000 in 1984 for this appropriation  which primarily
reflects our  reductions to  State  grants  brought about by  streamTlning  our  State
grant programs.

Research and Development

     The 1984   budget  decreases   the   Research  and  Development  appropriation  by
$7,331,000  to  $111,669,000.   Although    the  research  budget  decreases,   program
Increases to  improve  the   scientific  validity   of   our  regulatory  decisions  will
support  programs   for  hazardous air pollutants,  the water  quality-based  regulatory
approach, acid rain, quality assurance,  and toxics health effects.

Buildings	anj^Facilities

     EPA requests $2,600,000, a  decrease of $400,000  for the  Building and  Facilities
appropriation which finances the construction, repair, Improvement, extension, alter-
nation, and purchase  of fixed  equipment of  facilities owned,  as well as  existing
facilities occupied by  the  Environmental  Protection-Agency.   The  funds  In  1984 will
help correct health and safety  deficiencies in EPA laboratories and  prevent serious
deterioration of our owned and leased facilities.

Construction Grants

     The Construction  Grants  appropriation 1s  for  grants  to  local  public  agencies
for construction  of municipal   wastewater treatment  facilities  to assist  States
and localities In attaining water quality standards.

     In 1981  Congress  enacted significant  reforms proposed  by the  Administration.
These reforms provide  for  a  more  cost-effective program and  reduce  the  long-term
requirements for Federal  assistance.  Under  the  reforms, Congress provided  a four
year authorization  at   $2,400,000,000  with  an additional  amount  of  $200,000,000,
beginning' 1n  1983  for  combined  sewer  overflow,   the  1983 appropriation  provided
$2,430,000,000, which Included. $30,000,000 for combined  sewer  overflow.    In  1984,
the Agency  1s  requesting  $2,400,000,000  to obligate  funds to award  a  total  of  597
grants resulting 1n  4,764  active  projects.   In  addition, approximately  1,200 pro-
jects are expected to have construction  completed  during 1984.

Hazardous Substance Response Trust Fund

     The 1984 budget requests  $310,000,000, an  Increase of $100,000, and a decrease of
4.5 permanent workyears to  support  the  Hazardous  Substance Response  Trust  Fund.   In
1984 these  funds will  be  dedicated  to responding  to  the most  serious  hazardous waste
sites and spills;  encouraging States to  assume.a larger  role  1n  managing  response
actions; adapting  existing  research and  development  data and technology  to  support
field response activities; continuing  effective  enforcement activity;  and, support-
ing on-going activities of other Federal  agencies.
                                          S-2

-------
                            ENVIRONMENTAL PROTECTION AGENCY

                              Summary of Budget Authority
                          Obligations, Outlays, and Workyears
                                    By Appropriation
                                 (dollars in thousands)
                                                      Budget      Current
                                          Actual     Estimate     Estimate     Estimate
                                           1982        ..19_83__       1983          1984_
Researcn ana .Development
Siifldpt' An t'Hn ri "t"v
Obligations.... 	 	 	 	
Out! ays 	 	
Abatement, Control and Compliance

Obi i gations 	 	 	
Out! avs 	 	 	 	
X
$154,315.6
200,637.9
197,339.0
./
* 372,969.7
393,328.0
523.722.0

5108,703.8
130,260.0
165,648.0

311,575.0
320,408.0
387.165.0

$119,000.0
126,014.0
153,709.0

369,075.0
375,000.0
423.538.0

$111,669.0
112,434.0
140,764.0

293,933.0
294,871.0
366.359.0
Salaries and Expens.es                  ,
  Budget Authority... ----- ..........   /555.105.7    538,113.2    548,613.2     540,389.0
  Obligations .................... ..    540,773.2    538,113.2    548,613.2     540,389.0
  Outlays.. ....................... .    520,363.0    548,869.0    518,904,0     518,533.0
  Permanent Workyears ..............      9,112.4      8,069.8      8,442.4       7,996.8
  Total  Workyears ..................     10,853.5      9,821.0     10,157.6       9,678.7

Bui 1 dings and Faci 1 i t1 es               /
 " 'Budget Authori ty ... . . . ...........    / 3,621.0      3,000.0      3,000.0       2,600.0
  Obligations ........ , .............      3,384.7      3,864.0      5,033.0       2,965.0
  Outlays,... .....  ........... ......      3,325.0      3,559.0      2,825.0       4,689.0
Construction Grants

Obi igations 	 	
Outlavs 	 	

	 ?
	 2
	 , 3

400,000
,116,302
.756.152

,0
7
.1

1
?
3

,400,000
,400,000
,350,000

1)
n
.0

i
i
3

.430.
,000,
.100,

000.0
000.0.
000.0

2.400,
2,400,
2.800.

000.0
000.0
000.0
Scientific Activities Overseas
  QbTigallons......................         19.3        700.0         700.0         950.0
  Outlays	,	        677.0      1,200.0      1,000.0         600.0

Operations, Research and Facilities
  Obi i gati ons....,	        814.4           ...      1,432.7
  Outlays	,        289.0        500.0      1,633.0       1,439.0

Revolving Fund
"' ,OblTgatfons^	        750.0        700.0         800.0         800.0
  Outlays	         21.0        100.0         100.0         100.0

Enforcement
  Outlays..	      1,598.0           ...      1,002.0

u .5. Regul atory__C_qunc1_T_
  Out! ays...». .~.T... .7.T,	      245.0           ...         319.0
                                         S-3

-------
                                                       Budget     ' Current
                                          Actual      Estimate     Estimate      Estimate
                                           1982         1983         1983          1984  _


Mi sc . Contri b.uted Funds
  Obligations.......... ......... ...         22.7         25.0         30.0         20.0
  Outlays ......... ........... .. .....         12.0         20.0         20.0         20.0

Reimbursements
  Obi 1 cations,,., ....... ..... ..... ,     15,480.9     30,000.0     20,000.0     20,000.0
  Permanent Workyears ..............         54.4         58.8         58.8         53.0
  Total  Workyears ............ ..... ,         60.5         67.8         67.8         62.0
..... Trust
  Budget Authority .................    190,000.0    230,000.0    210,000.0    310,000.0
  Obligations ......................    180,743.6    230,000.0    240,476.0    319,870.0
  Outlays ................. ..... ....     79,576.0    188,000.0    177,000.0    269,000.0
  Permanent Workyears..., ........ ..        465.6        516.4        623.8        619.3
  Total Workyears ..................        527.7        592.2        699.6        707.1

Payment to Hazardous ; Substance             /
~Res]ponse Tru s V Fung         "             ""
  'BucfgWAutno'r'i'ty^. ............ ,.    (26,1)00.0)   (44,000,0)   (40,000.0)  '(44,000.0)
  Obligations ......................    (26,600.0)   (44,000.0)   (40,000.0)   (44,000,0)
  Outlays ............. .'. ..... , ______    (26, boo. 0)   (44,000.0)   (40,000.0)   (44,000.0)

TOTAL EMV I RONMENTAL PROTECTI ON
 AGENCY            !     !     *
 TuTget Authority ............ ..... $3,676,012.0 53,591,392.0 $3,679,688.2 53,658,591.0
  Obligations ......................  3,452,757.4  3,654,070.2  4,318,098.9  3,692,299.0
  Outlays ..........................  5,083,319.1  4,645,061.0  4,380,050.0  4,101,504.0
  Permanent Workyears ............. .      9,632.4      8,645.0      9,125.0      8,669.1
  Total Workyears. .................     11,441.7     10,481.0     10,925.0      10,447.8
                                                   X

                                         S-4

-------
                            ENVIRONMENTAL PROTECTION AGENCY

                              Suranary of Budget Authority
                          Obligations, Outlays, and Workyears
                                        By Media
                                 (dollars in thousands)
                                       Actual
                                        1982
 Budget
Estimate
  1983
Current
Estimate
  1983
Estimate
  1984
A1r


Ou tl ay s 	 	 ,


Mater Quality
Budget Authori ty 	 	 	 	 ,
Obi i gations 	 	
Outlays 	 	 	


Drinking Water

Obi i gations. 	 	 	
Outl ays 	
Permanent Workyears 	 	
Total Workyears 	 	 	
Hazardous Waste
Budget Author! ty 	 	 	 	 	
Obi 1 gations 	

Permanent Workyears... 	
Total Workyears
Pesticides
Bii^ge t Autho ri ty 	 	 	 	 	
Obi i gations 	
Outl ays 	 	 	

Total Workyears 	 	
Radiation

Obi i gations 	
Outl ays 	 	
Permanent Workyears 	
Total Workyears.... 	
Noise
Budget Authority 	
Obi i gati ons . • 	 	 	 	
Outl ays 	 	

Total Workyears 	 	
Interdisciplinary
Budget Authori ty . . 	 	 ,
Obi i gati ons 	 	 	
Outl ays 	 	 -..


	 $217,548.5
	 229,703.1
	 745,652.0
	 1,576.0
	 1,821.8

	 234,720.4
	 250,946.2
	 314,122.0
	 2,271.9
	 2.671.1

	 82,281.7
	 85 898.7
	 80,715.0
	 474.3
	 566.4

	 106,777.7
	 110,578.4
	 123,514.0
586.1
737.9
	 54,083.0
	 57,813.6
	 61.435.0
	 765.3
	 828,3

	 10,663.3
	 12 335.4
	 12^349.0
	 150.3
	 169.6
	 1,922.6
	 1,621.3
	 6,616.0
	 , 21 2
	 27.4

	 18,850.0
...... 16 928.9
	 14 425.0
	 200 2
	 243.9
                                                   $184,053.3
                                                    188,611.0
                                                    218,492.5
                                                      1,333.2
                                                      1,549.4
                                                    185,965.7
                                                    192,294.0
                                                    212,285.5
                                                      1,849.5
                                                      2,292.0
                                                     69,750.1
                                                     71,783.0
                                                     83,882.7
                                                        455.5
                                                        550.8
                                                    103,343.7
                                                    106,408.0
                                                    124,857.6
                                                        557.0
                                                        740.1
                                                     50,782.0
                                                     52,271.0
                                                     57,244.4
                                                        660.9
                                                        744.5
                                                     10,351.1
                                                     10,588.0
                                                     11,147.0
                                                        135.1
                                                        159.9
                                                         40.0
                                                        350.0
                                                     20,738.1
                                                     20,865.0
                                                     22,853.0
                                                        310.3
                                                        363.7
           5212,245.3
            214,902.3
            195,753.0
              1,374.4
              1,603.2
            215,998.9
            219,138.9
            255,108.0
              1,950.6
              2,379.3
             77,958.5
             78,820.5
             76,760.0
                471.2
                562.4
            116,551.5
            117,244.5
            115,722.0
                643.1
                821.9
             52,928.1
             52,978.1
             53,074.0
                662.2
                745.8
             10,923.3
             11,059.3
             12,483.0
                148.1
                172.2
              1,707.0
             23,935.9
             25;606.9
             22,979.0
                325.6
                388.8
           $190,991.6
            191,337.6
            199,621.0
              1,350,3
              1,577.1
            151,369.3
            151,818.3
            205,682.0
              1,662.9
              2,065.5
             66,355.9
             66,467.9
             73,568.0
                465.1
                560.8
            110,112.7
            110,194,7
            114,192.0
                625.8
                830.0
             52,742.6
             52,750.6
             53,430.0
                652.7
                736.9
             10,854.8
             10,872.8
             11,419.0
                126.9
                146.4
                663.0
             41,335.6
             41,595.6
             29 ,£98.0
                353.4
                ,396.5
                                            S-5

-------
                                                                       Budget      Current
X                                     •                 Actual        Estimate     Estimate     Estimate
                                                         1982           1983         1983          1984

                 Toxic Substances
                   Budget'"Authority	     74,855.8     68,604.0     69,661.8     66,675.7
                   Obligations	     82,712.8     73,155.0     71,451.8     66,891.7
                   Outlays	     82.211.0     80,130.3     79,915.0     71,368.0
                   Permanent Workyears	        634.4        607.7        626.7        606.2
                   Total  Workyears	        729.5        687.7        706.9        683.2

                 Energy
                 ""Budget Authority	-	     51,650.9     34,530.2     25,000.9     23,530.1
                   Obligations	     65,662.9     42,492.4     26,940.9     23,742.1
                   Outlays		     90,638.0     55,501.0     56,424.0     42,153.0
                   Permanent Workyears	        138.9         61.8         36.4         36.8
                   Total  Workyears	        196.9        100.1         53.5         54.9

                 Management and Support
                   Budget Authority..".".'	    229,037.1    230,273.8    231,484.0    232,022.7
                   Obligations	    221,352.2    230,273.8    232,916.7    232,022.7
                   Outlays	    211,634.0    235,438.0    228,861.0    225,901.0
                   Permanent Workyears	      2,293.8      2,098.8      2,204.1      2,116.7
                   Total  Workyears	      2,860.7      2,632.8      2,723.6      2,627.4

                 Buildings and Facilities
                   Budget Authority...	      3,621.0      3,000.0      3,000.0      2,600.0
                   Obligations	      3,384.7      3,864.0      5,033.0      2,965.0
                   Outlays	      3,325.0      3,559.0      2,825.0      4,689.0

                 Construetion Grants
                 'ludget AutfioLrity~T	  2,400,000.0  2,400,000.0  2,430,000.0  2,400,000.0
                  Obligations....	  2,116,802.7  2,400,000.0  3,000,000.0  2,400,000.0
                  Outlays..	  3,756,152.1  3,350,000.0  3,100,000.0  2,800,000,0

                 ScientificActivities Overseas
                   Ob'Ti gallons'.......'."........"."	         19.3        700.0        700.0        950.0
                   Outlays.	,	        677.0      1,200.0      1,000.0        600.0

                 Revolving Fund
                   Obligations.	        750.0        700.0        800.0        800.0
                   Outlays	         21.0        100.0        100.0        100.0

                 Misc. Contributed Funds
                   Obligation's.". ..7.....	         22.7         25.0         30.0         20.0
                   Outlays	         12.0         20.0         20.0         20,0

                 Reimbursements
                   Obligations.	     15,480.9     30,000.0     20,000.0     20,000.0
                   Permanent Workyears	         54.4         58.8         58.8         53.0
                   Total  Workyears	         60.5         67.8         67.8         62.0

                 U.S. Regulatory Council
                   Outlays..............	        245.0           ...        319.0

                 Hazardous Substance  Response
                  trust Fund
                   Budget Authority	    190,000.0    230,000.0    210,000.0    310,000.0
                   Obligations	    180,743.6    230,000.0    240,476.0    319,870,0
                   Outlays	     79,576.0    188,000.0    177,000.0    269,000.0
                   Permanent Workyears	        465.6  •      516.4        623.8        619.3
                   Total  Workyears	        527.7        592.2        699.6        707,1
                                                             S-6

-------
                                                      Budget      Current
                                       Actual        Estimate     Estimate     Estimate
                                        19.82           1983         1983          1984
Payment^ tq Hazardous Substa nee
        ''''
   TBudget 'Authority.. ..... . ........    (26.600.-0)   (44,000.0)   (40,000.0)    (44,000.0)
   Obligations .....................    (26,600.0)   (44,000.0)   (40,000.0)    (44,000.0)
   Outlays ........... ..... .........    (26,600.0)   (44,000,0)   (40,000.0)    (44,000.0)

TOTAL ENVIRQNHENTAL PROTECTION
 ......... Budget Authority.; .............. $3,676,012.0 S3, 591, 392.0 $3,679,688.2 $3,658,591.0
   Obligations ................ .....  3,452,757.4  3,654,070.2  4,318,098.9  3,692,299.0
   Outlays ................ .........  5,083,319.1  4,645,061.0  4,380,050.0  4,101,504.0
   Permanent Workyears .............      9,632.4      8,645.0      9,125.0      8,669.1
   Total  Workyears... ..............     11,441.7     10,481,0     10,925.0     10,447.8
                                            S-7

-------
Page Intentionally Blank

-------
 Air
SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
AIR                                                                         A-l

    RESEARCH S DEVELOPMENT
       Oxldants	,	  A-9
       Hazardous Air Pollutants........	  A-22
       Mob1 l,e Sources	,	  A-32
       Gases & Particles	  A-44
    ABATEMENT & CONTROL
       Air Quality & Stationary Source Planning & Standards..*....	  A-59
          Emission Standards & Technology Assessment	...  A-62
          Pollutant Strategies & A1r Standards Development	  A-63
          State Program Guidelines & Regulations Development	,...,,..  A-64
       Mobile Source A1r Pollution Control & Fuel  Economy	  A-66
          Emission Standards, Technical Assessment 4 Characterization	  A-68
          Testing, Technical & Administrative Support	  A-70
          Emissions & Fuel Economy Compliance	  A-71
          Mobile Source Standards & Guidelines	  A-72
       State Programs Resource Assistance	  A-73
          Control Agency Resource Supplementation (105 Grants)......,	  A-74
          Training..	.	  A-76
       Air Quality Management Implementation.	  A-78
       Trends Monitoring & Progress Assessment	,	  A-82
          Ambient Air Quality Monitoring	.....	  A-83
          Air Quality & Emissions Data Analysis & Progress Assessment.....  A^84
    ENFORCEMENT
       Stationary Source Enforcement.....	  A-87
          Stationary Source Enforcement.	  A-88
          Stationary Source Enforcement - Legal & Enforcement Counsel	  A-91
       Mobile Source Enforcement	  A-92
                                        A-l

-------
                                         AIR

                                ACTUAL    BUDGET      CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE    ESTIMATE     1904     DECREASE -
                                           1983        1983              1984 VS 1983
                                (DOLLARS  IN  THOUSANDS)

APPROPRIATION
 Salaries & Expenses          $74,412.8  $67,171.9   $70,480.0   $71,028.1      $548.1
 Abatement Control  &         $116,290.3  $92,800.8  $107,855.1   $92,815.4 -$15,039.7
 Compl i ance
 Research & Development       $39,000.0  $24,080.6   $33,910.2   $27,148.1  -$6,762.1

TOTAL, Air                   $229,703.1 $184,053.3  $212,245.3  $190,991.6 -$21,253.7


PERMANENT HORKYEARS             1,576.0    1,333.2     1,374.4    1,350.3      -24.1
TOTAL WORKYEARS                 1,821.8    1,549.4     1,603.2    1,577.1      -26.1
OUTLAYS                      5245,652.0 $218,492.5  $195,753.0  $199,621.0  +$3,868.0
AUTHORIZATION LEVELS
                                       A-2

-------
                                       AIR


OVERVIEW AND STRATEGY

     The Clean Air  Act authorizes  a  national  program  of air  pollution  research,
regulation, and enforcement activities designed to  achieve the  environmental  goals
prescribed by  the  health-related National Ambient  Air Quality  Standards  (KAAQS).
The Act also  authorizes  methods to control  emissions  of air pollutants which  are
deemed to  be  "hazardous"  and  for  which  no  ambient   standard  is  appropriate.

     Specific limitations  on  pollutant   emissions   necessary   to  meet  NAAQS  are
adopted in  State   Implementation Plans  (SIP).    These  controls  are  supplemented
by Federally  prescribed  national emission  standards for  selected new  stationary
sources (called new  source performance  standards)  and new  mobile sources of  air
pollution.  In addition,  hazardous  pollutants from  new or existing sources may  be
controlled by  National  Emission Standards for  Hazardous Air  Pollutants  (NESHAP).
Overall the Agency's efforts focus  on  four broad  program areas  in  order to achieve
environmental results.  These  programs  include:  setting  appropriate ambient  stan-
dards, maintaining a  Federal  and State  partnership  including  adequate  enforcement
of environmental  regulations,  promulgating emission  standards, and assuring  adequate
mobile source controls.

Ambient Standards

     The Clean Air  Act  requires the Administrator  of EPA  to  set  NAAQS  for  the
ambient concentrations of air pollutants  (criteria pollutants)  necessary to protect
public health  and  welfare.   These  standards must  be  reviewed and  if  necessary
revised, every  five  years.    EPA  promulgated  a  revised  ozone (03)  standard  in
1979.  A  revised  carbon  monoxide (CO) standard  is  scheduled to be  promulgated  in
1983.  Changes to the standard for hydrocarbons  are also scheduled  for  promulgation
in 1983,   Revisions  to  the partlculate  matter  (PM),  sulfur  dioxide  (SOg),  and
nitrogen dioxide  (NOg)   standards  are  expected  to be  proposed  in  1983.   Those
three standards will then be promulgated fn 1984.

     Review and revision  of the  NAAQS is based  on the  most  accurate and  up-to-
date scientific data  on  the  health and  welfare  effects  of the  various  criteria
pollutants.  This scientific support,  as well as  the development  and  provision  of
reliable monitoring methods,   evaluation  of  cost-effective  control  technologies,
an<( the development  of  models  which  permit States,  Regions,  and  the  regulated
community to  comply  with the  national  standards,  are  provided by EPA's  research
program.  In 1984, EPA will  publish an updated criteria  document  on lead  and com-
plete one on  ozone  in support of  the NAAQS  reviews.  Research will also  continue
to support the future updating  of criteria documents  for the subsequent review and
revision cycle of other  NAAQS.  In  health research, both human and  animal  studies
of responses  from  exposure to  03 and N02 will  continue.   Changes in  resistance
to infection will  be emphasized in the human  studies.  The animal  studies will con-
centrate on  the  respiratory effects  from long-term exposures  and the  development
of improved models  for extrapolation to  human  responses.  The National Crop Loss
Assessment Network program  will  focus  on the  crop loss impacts  associated  with
ozone.

     The gases and particles research program will  focus on providing  the  informa-
tion needed to support the  implementation  of a  new  partlculate  standard.   Monitor-
ing stations  will be  modified for the new standard.   Health studies will  compare
human and animal  responses  to  exposures  of particles of  various sizes.  Urban  and
regional dispersion models  for particles will be improved to account  for  particle
size.  Research will  continue  on the development  a»d  validation of  air  quality
dispersion models  required  for use  In  complex terrain.   Also,  Information  on
low-cost, highly  reliable  emission  reduction  technology design  and  performance
criteria will be developed.
                                         A-3

-------
Federal/State Partnership

     In view of the Clean  Air  Act requirement that States take a lead role  in  air
pollution control  programs, the maintenance of  an  adequate  Federal  and  State part-
nership Is  important  in achieving environmental  goals.  The  current statute  re-
quires each  State  to  adopt and to  submit to the  Administrator  a plan  which pro-
vides for  the  implementation,  maintenance,  and  enforcement of  each ambient  air
quality standard.    These State  Implementation  Plans  (SIPsi are  approved  by  the
Administrator if  it is  determined  that they  meet the  requirements specified  in
the Act.

     EPA will maintain  a  relationship  with the States which stresses the  elimina-
tion of unnecessary  processes  and a  streamlining of  necessary  processes so  that
both the  States  and EPA  can  concentrate on  environmental  results.  Programs  and
support reflecting  regulatory  reform,  broader  State  discretion  in carrying  out
regulatory programs, a.nd postponement  of lower  priority  activities having  less
environmental pay-off should result in a  reduced  need  for financial  assistance and
an increase  of  technical   assistance   on the  complex  problems  of  the  1980's.

     During 1984,   EPA   will  provide   both technical  and  financial  assistance  to
the States  for:  SIP revision  and implementation; analysis  of controls  necessary
due to the  potential revision  of  the  ambient air  quality  standards; and technical
review of  new  sources  when the  new   source  review program  is  delegated.   Urban
and regional scale models for the formation and transport of photochemical  oxidants
will continue to be developed and validated  for use  by the  States for the revision
of State  Implementation Plans.   Research to  develop  data  on demonstrated  cost-
effective and energy efficient emission reduction  technologies  for volatile organic
compounds with  nitrogen  oxides  will   also  continue.   Twenty-nine  States  have
submitted SIP  revisions for the  control  of ozone  and carbon  monoxide  by  1987.
Approved portions  of these plans  will  be  implemented  In 1984.  In  addition,  some
States cannot demonstrate  attainment by  1987 and  additional measures will  need to
be developed and incorporated in the  SIPs.

     EPA will work  with State  and local  agencies  to assure  that intergovernmental
enforcement effort brings  about full  compliance with the laws and  standards.  EPA
Regional Offices  will   provide  the  majority  of  this  assistance  directly  to  the
State and local air pollution control  authorities.

     In cooperation with  the States,  EPA has  been  developing a prioritized list
of the most significant violating sources to  focus  resources where the  greatest
environmental gains can be  made.  EPA,  in  1984,  will  continue to  look  to  the
States to  assume  the  primary  role  1n bringing enforcement actions  against these
sources and  will  provide  technical  support  as needed.  Where  the  State efforts
are hot  successful,  EPA  will  ensure  compliance  by  taking  Federal  administrative
or judicial action.

     The Act directs  the Administrator  to take enforcement actions when  certain
violations of  the  State  Implementation  Plans  or  emissions  limits  are  found.
Recently, EPA has  been  working more  closely with  State  and  local  agencies to pro-
vide technical  support  to aid the  assumption of  increased enforcement responsibility
by these units of government.

     The research  program  will  continue to contribute to  the  information  required
by States  and  local control  programs, and  by  the  Regional  Offices in  assisting
these programs.   Primary attention  will  be  devoted to  refining and updating' the
pollutant transport and transformation models  on  which these decision-makers,  as
well as  those  in  the   regulated  community,  depend  to make  decisions  on  siting,
permitting, and control  strategies.   The  engineering  research program  will  focus
on evaluating  and assessing the  effectiveness  of  selected control  technologies,
with an emphasis  on volatile  organic  emission  controls, sulfur  dioxide,  nitrogen
oxides and  particulates.   In 1984,  the program also will be increasingly  involved
in providing quality assurance guidelines and support.
                                         A-4

-------
     During 1984,  the  impact of  any  reductions  in  Federal  financial  assistance
must be evaluated  to  ascertain  whether additional  Federal support can  be  replaced
by the States in  1985.   State and local agencies will  be evaluating the potential
for increasing  their  share of the  financial  burden through  fncreased  use of  fee
systems.

Emission Standards

     The Act  directs  the Administrator  to  publish  and  enforce  Federal  standards
of performance  for construction  of  new sources  of air  pollution.   In 1979,  the
Administrator published a  list  of the  categories  of stationary  sources  that  could
be expected to  contribute  significantly  to  air pollution.  The  Act  directs  EPA to
establish new source  performance  standards  (NSPS)   for  all  categories on  the list
within four years.

     While progress has  been  made,  promulgation of NSPS for all major  stationary
sources was not completed by 1982.  Consequently,  a  sustained  level of resources
will  be  necessary to  ensure  continued progress  towards  the   completion  of  all
categories on the NSPS list.

     In addition to establishing mechanisms to  control  pollutants that  are  covered
by the national ambient  air quality  standards, the Act  also  prescribes  procedures
for controlling  pollutants that  are  deemed to  be  "hazardous".   The Act  directs
the Administrator  to  publish a 11st  which  Includes  each hazardous  air pollutant
for which  an  emission standard  should  be  established.  These  emission standards
apply to both new and existing pollutant sources.

     Seven substances have  been  listed  as  hazardous  air pollutants.   These are:
asbestos, beryllium,  mercury,  vinyl chloride, benzene,  Inorganic arsenic, and radlo-
nuclldes.  Emission standards have been  promulgated for the  first  four  pollutants.
Standards are  being  developed  for  benzene  and radionuclldes,  and   standards  for
arsenic are under study.

     During 1983 and  1984,  work will  continue on screening chemicals to determine
which ones to list as hazardous.  The  program  will  provide detailed  assessments of
health impacts, current  emissions,  public  exposure, public risk  (where  possible),
feasible emission  reductions  and  associated costs,  and  regulatory  options.   This
will  lead  to  regulatory  decisions  for  approximately  nine  pollutants 1n  1983.

     EPA will  develop  a  comprehensive  strategy for  controlling toxic   air  pollu-
tants using  both  Section  112  and  other  sections  of  the  Act.   This  strategy
will  take into  account the  considerable  degree of .control already achieved through
regulation of partlculates  and  volatile  organic compounds under other  sections of
the Act.

     In support of the Hazardous  Air Pollutants regulatory program,  emphasis will
be placed  on  research to develop comprehensive health assessment documents  for a
substantial number of suspect  chemicals.   Specifically,  16  assessments begun in
prior years will  be  completed  in 1984  and 14  new  assessments will  be  Initiated.
Research will  continue to determine the  presence, source  concentration and  fate of
potentially hazardous air  pollutants,  ar)d to  assess  the human health effects  and
risks associated with exposure  to these pollutants.  Also, 1n 1984,  emphasis will
be placed  on  improving  the  sampling  and  analysis of  potentially   hazardous  air
pollutants; to  expand knowledge  of  the transport, transformation,  and fate,  of
these pollutants;  and to enhance  the understanding  of dose-response  relationships.

Mobile Source Controls

     The Act  directs the Administrator to insure that  certain prescribed standards
for motor  vehicles are  being met.   Several  Federal requirements  were  established
to meet  this  mandate.   Recently, the  mobile  source  air  pollution control  pro-
gram initiated  efforts  to  simplify  the motor vehicle preproductfon and  presale
requirements.  These efforts will  continue  in  1984  and  should result in  the reduc-
                                         A-5

-------
tion of paperwork,  reports, and  tests  currently performed by the  automobile  manu-
facturers —  without sacrificing  environmental  protection.  The  move toward  in-
creased emphasis on  the compliance  of  vehicles in-use will continue  in 1984.   For
example, additional  emphasis  will  be placed  on encouraging States to develop  en-
forcement programs to curtail  fuel  switching and tampering.

     Although most  of the Auto  Task  Force  relief  measures will  be  completed  in
1983, one  item,  the  assessment  of an  alternative  compliance  program,  will   con-
tinue in  1984.   If  a replacement  program  is  feasible,  the appropriate  legisla-
tion will be proposed and  an appropriate program developed.

     Statutory mandates for setting  emission standards for particulates and nitrogen
oxides from heavy  duty  engines will  be initially completed in  1984.   Revisions  of
these standards, ff warranted, may take place before 1986.  In addition, the revised
hydrocarbon and carbon monoxide standards for heavy  duty engines for 1988  and  later
model years would  be developed  in  the 1983-85  period.   Likewise, the light duty
diesel particulate  standard  will  be  reassessed,  if needed,  during this  period.

     Research support to  the  mobile  sources regulatory  program  will continue  to
focus on  assessing  human  exposure to  motor  vehicle  pollutants   (especially  CO),
using personal monitors, and  in  comparing these population exposure  profiles with
readings from fixed monitoring stations.

Environmental  Results

     Air program activities  have been directed  toward  the attainment and  mainte-
nance of  NAAQS.   The  combined   Federal-State-local  effort  at  controlling  air
pollution has  achieved  a  noticeable  degree  of success  in improving ambient  air
quality across the Nation, with some  areas  attaining all  standards.   The  Clean
Air Act,  as  amended  in 1977,  requires  specific results  in those areas  where  air
quality standards  are exceeded.   The Act requires  that the standards be attained
by the end of calendar year 1982.  However,  for ozone  and carbon monoxide, attain-
ment of these standards is to  be as expeditious as possible, but  in  no case  later
than 1987.  Extensions  of the ambient  air  quality  standard  attainment  dates  for
ozone and  carbon monoxide beyond  1982  were  granted to  29  States.   In  1983,  all
necessary measures for control  of ozone should be adopted by State and local govern-
ments.  Their  implementation  will  begin in  198J  in  most  States with  intensive
implementation expected during 1984.

     Both NSPS and  NESHAP  sources  currently exhibit low  violation  rates;  the per-
centage of sources  in violation  and not meeting an  acceptable  compliance schedule
is 3.1  percent  and  1.4  percent  respectively.   EPA and  the  States  will  need  to
concentrate on ensuring these rates remain  low.   Compliance with  these  standards
remains a  high   priority  of the  air  enforcement  program.  EPA  will continue  to
encourage delegation  of existing and newly  promulgated  NSPS and NESHAP;  however, a
residual level of £PA enforcement activity will be required.

     The potential  problems  associated  with  acid   deposition  continue  to be  of
great national  and  international  concern.   Before  any  regulatory  action can  be
taken, the  major  sources  of  acid  rain  precursors need to  be  identified;  the
magnitude, extent,  and  severity  of acid  deposition effects  need to be  assessed;
and possible measures for  mitigating theSe  effects  heed to be evaluated.   Research
to respond to these gaps  1n the data  base are Included  in the multi-media energy
program.
                                         A-6

-------
                                         AIR


                                      Budget     Current               Increase*
                            Actual    Estimate    Estimate    Estimate    Decrease*
Program Activities           1982      1983       1983        1:984      1984  vs. 1983

Number of pollutants
 covered by hazardous
 pollutants standards...        4656            +1

Number of source categories
 covered by New Source *
 Performance Standards...      40       66         52          67            +15

NSPS Proposal	       7       --         26          12            -14
NSPS Promulgation..	       4       —         19          18            -T

Number of automobile
 engine families awarded
 certificates for con-
 formity with emission
 standards	       302      250        250         250

Number of emission tests
 carried out for motor
 vehicles certification
 purposes....	      444      300        300         300

Number of fuel  economy
 tests carried out	       281      700        700         700

Assembly line testing
 test orders	        25       17         17          17

Combined fuels/vapor
 recovery inspections...   14,000   25,000     15,000      15,000

Recall Investigations...       42       35         38          44            +6

Numbers of compliance
 monitoring inspections
 conducted by EPA	     2,093    1,835      1,835       1,694           -141

Number of compliance work-
 shops presented to State
 and local agencies	     52       40         50          60            +10

Number of training courses
 provided for State and
 local agencies	     27       17         17          15            -2

National Ambient Air
 Quality Standards
  Proposal...		      —       —         PR,  S02    Pb            — '
                                                   N02

  Promulgation	      —       —         CO          PM,  NO?
                                                   HC**       S02

*  Standards for  33  source categories were developed  prior to the August 1979 pri-
   ority listing.   Subsequently,  promulgations  were made  for 7   source  categories
   from the priority  list between  August 1979 and September  30,  1982;  and 4  addi-
   tional source  categories  were  covered  during  the  first  quarter  of   1983.

** Rescission
                                         A-7

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents


                                                                               Page

AIR

    RESEARCH & DEVELOPMENT
       Oxi dants	     A-9
       Hazardous Air Pollutants........	     A-22
       Mobile Sources	     A-32
       Gases & Particles....	     A-44
                                        A-8

-------
AIR
Oxidants
ACTUAL BUDGET
1982 ESTIMATE
1983

PROGRAM
Scientific Assessment
Salaries & Expenses
Research & Development
TOTAL
Technical Information &
Liaison
Salaries & Expenses
Research & Development
TOTAL
Monitoring Systems &
•Qu.al i ty Assurance
Salaries & Expenses
Research & Development
TOTAL
Health Effects
Salaries & Expenses
Research & Development
TOTAL
Environmental Engineering
.& Technology
Salaries & Expenses
Research & Development
TOTAL
Environmental Processes
& Effects
Salaries 4 Expenses
Research & Development
TOTAL
(DOLLARS
$192.3
S355.1
$547,4
$186.8
$6. .9
$193.7
$985.6
$369.2
Si, 354.8
51,085.2
$4,130.9
$5,216.1
$565.2
$1,575. 0
52,140,2
$1,509.7
S5, 898.0
$7,407.7
CURRENT ESTIMATE INCREASE +
ESTIMATE 1984 DECREASE -
1983 1984 VS 1983
IN THOUSANDS)
$425,8
S300.8
$726.6
$185,5
$185.5
$693.9
$390. 1
SI, 084.0
SI, 138. 7
$1,952.2
53,090.9
$761.7
$1,602,7
52,364.4
SI, 375. 4
52,632.0
$4,007.4
$457.1
$300.8
$757.9

$693.9
$390.1
SI , 084, 0
51,138.7
$1,952.2
S3, 09 0.9
SI, 17 2, 6
$2,569.6
$3,742.2
$1,441.8
52,982.0
$4,423.8
S467.5
$600.8
$1,068.3

$752.7
$290.0
$1,042.7
$1,177.1
$1,910.9
S3, 088.. 0
$1,138.9
SI, 511.0
$2,649.9
$1,763.1
$2,180.2
$3,943.3
$10.4
S300..0
$310.4

$58.8
-$100.1
-$41,3
$38.4
-$41.3
-S2.9
-$33.7
-$1,058.6
-51,092.3
$321,3
-$801. 8
-S480.5
TOTAL.;
 Salaries £ Expenses
 Research & Development

Oxidants
        $4,524,8   $4,581.0   $4,904.1   $5,299.3    $395.2
       $12,335,1   56,877.8   S8.194.7   S6,492,.9 -$1,701,8

TOTAL  $16,859.9  $11,458.8  $13,098.8  $11,792.2 -$1,306.5
PERMANENT WORKYEARS
Scientific Assessment

Technical Information &
Liaison
             3,8

             3.6
5.5

1.9
6.5
6.5
                                      A-9

-------
                                         AIR

                                       Oxidants

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
                                (DOLLARS IN THOUSANDS)
Monitoring Systems 4
Qua! ity Assurance

Health Effects

Environmental Engineering
'& Technology

Environmental Processes
& Effects

TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
15.1
10.3
10.3
10.3
Scientific Assessment

Technical Information &
Liaison

Monitoring Systems *
Quality Assurance

Health Effects

Environmental Engineering
& Technology

Environmental Processes
& Effects

TOTAL WORKYEARS
13.8
9.3
22.1
67.7
5.7
5.1
18.9
15.9
13.1
27.2
85.9
16.6
6.7
18.9
59.9
8.0
3,6
14.8
17.6
14.4
26.1
84.5
16.6
11.8
20.9
66.1
9.0

14.8
17.6 '
22.6
28.1
92.1
16.6
11.5
19.3
64.2
9.0

14.8
17.6
21.8 .
34,4
97.6

-.3
-1.6
-1.9




-.8
6.3
5.5
                                      A-10

-------
                                          AIR
                                        Qxidants
Major Outputs/Milestones

Develop and Validate Air Quality Models.

-  Develop .improved chemistry mechanisms
   for urban scale ozone model,
   (Env. Processes)

-  Develop and validate the final regional
   scale ozone model.  (Env. Processes)

Develop Health and Welfare Effects
Information.

-  Assess ozone impacts on crops
   representing 90% of U.S. Acreage.
   (Env. Processes)

-  Provide journal article on the
   effects of chronic N02 exposure on
   host lung defenses, pulmonary function
   and structure in mice.  (Health)

-  Provide journal article describing
   the response to 03 on otherwise
   nornal individuals who have sensitive
   (responsive! airways,  (Health)
-  Provide journal article on rejfon.al
   dosimetry and species sensitivity to
   ozone.  (Health)

Develop and-Validate Measurement and
Monitoring Methods.

-  Provide quality assurance support
   for Oxidant programs.  (Monitoring)

-  Provide final report from National
   Atmospheric Pollutant Background Network.
   (Monitoring)

Research and Assess Emission Reduction
Technologies.

-  Report on design and construction of a:
   flare testing facility (Env. Technology)

-  Report on the results of joint demon-
   stration with a major truck manufac-
   turing Company to evaluate micro-
   processor control device for VOC.
   (Env. Technology)
Actual
 1982
12/84


12/86
Current
Estimate   Estimate
  1983       1984
  12/84     12/84


  12/86     12/86
 9/84




 8/83




12/83

12/84
   9/84




   8/83




  12/83

  12/84
 9/84
IE/83

12/84
12/82


 6/84





 3/83


 6/83
  12/82     12/84


   6/84      6/84

-------
                                          AIR


                                        Oxidants


                                                               Current
                                                Actual          Estimate   Estimate
Major Outputs/Milestones                         1982:            1983       1984

    Provide guidance on how to apply            12/83
    advanced heavy-oil, low NOX burner to
    oil field steam generator.  (Env.
    Technology)

    Report on the cost and efficiency           12/85            12/85     12/85
    of improved VOC reduction technologies.
    (Env. Technology)

    Provide report on pilot-scale tests of                        6/84      6/84
    reburning techniques on stationary combustors.
    (Env. Technology)

    Provide report on technical requirements                     12/84     12/84
    for pellet fuel for NO, and SOX control
    from stoker boilers.  (Env. Technology)

    Provide report on bench-scale tests of                                  6/84
    potential for NOX reduction in industrial
    glass furnaces.  (Env. Technology)
                                         &-12

-------
                                          AIR


                                        Qxidants


BudgetRequest

     The Agency  requests  a  total  of  $11,792,200  and  64.2 permanent  workyears for
1984, a decrease  of  $1,306,600 and .1.9 permanent workyears  from  1983.  Included in
this total  is 55,299,300  for  Salaries and Expenses  and  $6,492,900 for Research and
Development, with an  increase  of $395,200  and a  decrease of $1,701,800 respectively.
This net decrease occurs  primarily  in the environmental  engineering and technology
program element.  In  addition, the  decrease  reflects  the  transfer of $1,113,000 in
exploratory research funds to the Intermedia program.

Program Description

     The Clean  Air  Act,  as amended in 1977 (the Act),  requires  the Environmental
Protection Agency  (EPA)  to   periodically re-evaluate  the  adequacy  of  National
Anbient Air Quality  Standards (NAAQS) based upon the most  scientifically credible
data base available  at the time  of review.  Research  is also needed  to help the
regulatory decision-makers, the  regulated community  and the  Regional,  State and
local officials develop cost-effective control  strategies and Implementation proce-
dures for the control  of  oxidgnts which  include  ozone,  volatile  organic compounds
(VOCs), and nitrogen  oxides  (NOX).   The  following  objectives  support these goals:

     Objiective 1.  Develop and Vali date  A1 r  Quailty Modelsto Support Imp! ementa-
tion,  Maintenance  aih"3Enforcement  o?  toai'ionaT"" Ambient  107  Qualify" standards
I NAAQS).  Research under  this  objective provides  the  air  quality  moMT^, emtssTbns"
data, mo n i to ri ng tools, and technical  strategies  required by the  Act.  The results
Of this work are disseminated  to  the Regions, States, local governments and industry
for use in the development of  State Implementation  Plans  (SIPs) for the control of
photochemical oxidants.

     Objective 2.  DevelopHealth and Welfare .Effects Information  to Support Review
and Revision of NAAQS^A cr i te ri a iJb'c ume ri t for heal 'th'and ' wel fa re" e?f ec ts prbv'f tie's
the primary documentation of  scientific  data  for  use  in  the review  of existing
ambient air quality  standards.  The entire process  of updating a  criteria document
and proposing and finalizing  changes to  the  existing  standard is  done at five-year
intervals as specified  in Sections  108 and 109  of the Act.   This  criteria document
incorporates the  data  produced by  the health  program  relating  to  the observable
health effects from  ozone and  pollutant  mixtures,  and  the crop  loss  information
resulting from environmental  effects research.

     Objeptive 3.	Develop and Va1i da te Me a s u remen t  and Mo ni tor ing Methp ds i n Su p-
port of; the!JOxiHajts^rogr&m^Kequiremerits,  Mew ana1 improved  air  pollution method-
oiogfes and liidriT'torTng  techniques  are  oeing developed and  evaluated to determine
air quality  trends,  compliance,  and  enforcement actions.   Ambient,  source,  and
exposure measurement  methods   are  needed for  criteria  pollutants  and  important
related pollutants.

     Objective 4.  Research and Assess Emission Reduction Techoplogles  to  Support
PermiWfng, New Source Performance Standards (R5P5), 'and" CompTianCje"Actffi'tjei.  TrT
order to promulgate  cost-effective  NSPS  and  provide assistafice"r^t) EPA Regions,
State and local  officials in their  permitting,  enforcement and  compliance activ-
ities, research must  be conducted to identify design criteria  for  developing more
reliable and less costly NOX and VOC emission reduction technologies.
                                         A-13

-------
     Objective 5.  Provide Quality Assurance Support  for  the Oxidarits Pnjgram Re-
             Fhis vs a  Tong-terra,  continuing  task  In  support of TVtTeI'T4tf,~~Pa"rtI"5fc,
which specifies  mandatory quality  assurance  for  State  and local   air  monitoring
stations.  All  measurements  must  be  traceable  to  National Bureau  of  Standards
standard reference methods  (SRMs) for  the  purpose of  providing good  procedures,
wherever possible, thereby ensuring  that  Agency  decisions are  backed  by technical
data that are accurate and precise.

SCIENTIFIC ASSESSMENT

1984 Program Request

     The Agency  requests a total  of  $1,068,300  and  6.5 permanent workyears  for
this program,  of which $467,500  is  for  Salaries  and Expenses  and  5600,800  is for
Research .and  Development.  This   reflects  an • increase  of  $.10,400 and  3300,000
respectively, which supports the need to apply increased resources to the intensive
final stages of  the  ozone (photochemical oxidants) criteria document  development.

     Develop Health and Welfare Effects Information to Support Review  and Revision
of NAAT^  The current  Agency  schedule for  reviewing and  updating  the  ozone NAAQ5
cans for  final  standard  promulgation in  January 1986.  Thus,  the final  review
draft of the ozone criteria  document will be completed  in July 1984 and published
in 1985.  This  document provides  the primary documentation  of  key  scientific  data
needed for reviewing the existing standard.

198.3 Program

     In 1983,  the  Agency  is   allocating  a  total  of  $757,900  and 6.5  permanent
workyears to this  program, of  which $457,100 is  under the Salaries and  Expenses
appropriation and  $300,800 is for  extramural   purposes  under  the  Research  and
Development appropriation.

     Develop Health and Welfare Effects Information to Support Review  and Revision
of ' .NAAtg,  Fhe  first  external   review  draft of the' j^vTsM'crTte'rts  document Yor
photochemical oxidants  is  being prepared  for  release to  the public  for  comment by
February 1983.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$31,300 results from the following action:

     -Reprogramniings.  (+$31,3.00)   During the development  of the  operating plan,
several reprogrammings  were made  to this activity which are not reportable under
the Congressional  reprogramming  limitations.   These  changes  resulted  in  a  net
increase of +$31,300 to the Salaries and Expenses appropriation.
     In 1982, the Agency  obligated  a total of  $547,400  for this  program,  of which
$192,300 was  under  the Salaries  and Expenses  appropriation  and $355,100  was for
extramural purposes under the Research and Development appropriation.

     Develop Heal th and Wei fare Effects Information to Support Review  and Revision
of HAAQS.  The  second  update of^  the  criteria document  for photochemical "oxidants
was initiated.  In addition, technical support was provided to assist the Office of
Air Quality Planning and  Standards  (OAQPS)  in the regulatory proposal development,
public comment review and final  promulgation of a revised NOX standard.
                                         .A-14

-------
TECHNICAL INFORMATION AMD LIAISON

1982 Accomplishments

     In 1982, the  Agency  obligated  a total  of 5193,700  for  this  program,  of which
$186,800 was  under the  Salaries and  Expenses  appropriation  and  .$6,900  was  for
extramural purposes under the Research and Development appropriation. This activity,
which supports research programs across all  media, was consolidated into the Inter-
media program in  1983.  Thus, the  Program Description,  1984 Program Request,  1983
Program, and 1,982. Accomplishments narrative' sections appear there.

MONITORING SYSTEMS AMD QUALITY ASSURANCE

1984 Program Request

     The Agency requests  a total of 51,042,700  and  10.3 permanent  workyears  for
this program, of  which $752,700 is  for  Salaries and Expenses and  5290,000  is for
Research and Development.  This  reflects  an  increase of  558,800  and  a decrease of
5100,100 respectively.  This  net decrease results  from the transfer  of resources
for the exploratory research program to the Intermedia program.

     Develop and ValidateMeasurement_and Monitoring Methods in Support of the Oxi-
dants Prog ram Requirements.Ten  standard  ultraviolet  photometers,  developed  For
use in monitoring"ozone concentrations during field operations,  will  be delivered
during the 1983-1986 time  frame  and  distributed  to  the  Regions for use as  standard
reference instruments  for  ozone  measurements.  Emphasis will  be  placed on evalua-
ting existing, commercial  VOC measuring  instruments  and preparing  guidelines  and
operation manuals for use by EPA, State and local authorities.

     Provide  Quality Assurance Support for the Oxidants Program Requirements.  The
National Standards Laboratory and the National  Audit Program wilt be maintained, and
the repository of  standard reference materials  operated.  Reference  samples,  gas
samples, permeation  devices  and  flow  rates  traceable  to  NBS  standards  will  be
supplied to the user  community.   The audit program will  ensure  that the data base
used for regulatory decision-making  is accurate,  precise  and reliable.   The National
Atmospheric Pollution  Background Network  will  be completed  1n  1984.   The  data
gathered from this network will be reduced, validated and entered into  the National
Aerometric Data Bank for use  by the  scientific  and  regulatory community.  Short-term
monitoring support will be provided  to the OAQPS and  the Regions  for use in review
of State Implementation Plans for air transport model  development.

1983 .Program

     In 1983, the  Agency is  allocating  a total  of $1,084,000 and 10.3 permanent
workyears for this  program,  of which $693,900 is under  the  Salaries and  Expenses
appropriation and 5390,100 for extramural purposes  under the Research and Develop-
ment appropriation.

     Develop and Validate Measurement and Monitoring Methods in Support of the Oxi-
dants Program Requ 1 reiBents~I  The emphasis  of  the  monitoring'program  is on evaluating
existingTVOC ironitb-ring "instruments  and  preparing user  guidelines  and manuals for
the use of these existing instruments.   Two of the standard ultraviolet photometers
are being delivered to selected Regions for- use as standard instruments  for calibra-
tion of field units.

     Provide  Quality  Assurance  Support  for the  Oxidants Program  Requirements.
The Nat'Tonalstandards Laboratory and the  National  Audit Program  are operating and
supplying gas samples, permeation devices, reference analyses and flow rates trace-
able to  MBS  standards to the  user  community.   The  National  Atmospheric Pollution
Background Network  is  being operated with  five  stations  as  sufficient data  have
been obtained from the three discontinued stations.   Short-term  monitoring support
is being supplied to OAQPS  and the  Regions  for  use in  review  of  State Implementa-
tion Plans and for air transport model  development.
                                         .A-15

-------
1983 Explanation of Changes from Budget Estimate

     There is no change from the Budget Estimate.

1982 Accomplishments

     In 1982,  the  Agency  obligated  a  total  of $1,354,800  for this  program,  of
which $985,600 was  under  the  Salaries and Expenses appropriation  and 5369,200 was
for extramural purposes under the Research and Development appropriation.

     Develop and Valj. date^ Heasuj'enrentjmd>Monitoring Methods in Support of the pxi-
dantsTrOqram^RequTrenienf?!  Resea'rclf^on  monTtaring  systems  for the measurement1' of
ozone, nitrogenoxidesand  other  oxidant  precursors (e.g.  VOCs)  was  conducted.
One ultraviolet  photometer  was  delivered to  EPA for use  in  developing guidelines
and manuals.  Preliminary  work  was carried  out on the  development of a portable,
low cost VOC monitor.

     ProvideQuality  Assurance  Support  for  theOxidantsProgramRequirements.
The repository of standard reference materials waTraaintai"he'd.  Reference analyses,
gas samples, permeation devices and flow  rates traceable to  the  MBS standards were
provided to  the  user  community.   The  National  Audit program  was  continued.  In
addition, the  National Atmospheric  Pollution  Background  Network  operated  eight
stations in National Forests.

HEALTH	EFFECTS

1934Program Request

     The Agency  requests  a total  of  $3,088,000 and  16.6 permanent workyears for
this program, of which 51,177,100  is  for Salaries and  Expenses and $1,910,900 is
for extramural Research and Development activities.   This reflects and increase of
$38,400 in Salaries and Expenses and a decrease of $41,300 in Research and Develop-
ment.  This slight  net decrease results from  increased  emphasis on clinical  dose-
response work in an effort  to  obtain  more  data on  the acute  effects  of oxidant
inhalation and to  investigate the possible  health  risks to those  persons  who may
be more sensitive to oxidant exposure which was offset by the transfer of long-term
exploratory research funds to the Intermedia program.

     Develop Health and Welfare; JEff'gctj. Infprmatiori _tp__Support_Revi_ew^ and Revision
of NAAQS.  the TieaTtTT  research  program has two major goals:  TT  to provide Sata oh
a full range of  health  effects of  03 and KOg  exposure  from human  and animal studies;
and 2) to provide better models to extrapolate animal data to humans.

     EPA relies on animal  test data i.n setting and  revising standards for protecting
human health  under the  Clean  Air  Act.  Present  extrapolation  techniques do not
always provide a reliable and quantitative correlation between animal and predicted
human response.   Therefore,  improvement  of  these techniques  is a  priority  need.
Animal experiments  will  provide  data on  the functional, morphological,  and bio-
chemical changes  occurring in  young  and adult  rodents  following  six weeks  of
exposure to ozone and  NO?.  Newly developed sophisticated animal tests will be used
to measure subtle metabolic and biochemical  deviations  following oxidant exposure.
These test-results  will provide a  refined data base to develop a  cost-effective,
accurate model to extrapolate animal  biochemical and metabolic  responses to human
effects.  Human  studies of  oxidant  removal   in  the nasal  passages  will  support
development of reliable extrapolation models.

1983 Program

     In 1983, the  Agency is  allocating a total  of $3,090,900  and 16.6 permanent
workyears to this program,  of which $1,138,700  is under the  Salaries and Expenses
appropriation and $1,952,200 is for extramural Research and Development activities.
                                         A-16

-------
     Deyelop Health and Wei fare Effects Information to Support Review  and Revlsi on
of NAAQS.  Mathematical  modelsthat  can predict  respiratory tract" dose patterns
of ozone and  NC>2 are  essential  for extrapolation of effective pollutant concentra-
tions between animals  and  man.   In 1983, a validated  mathematical  model  for ozone
uptake is  being completed.   In  addition,  work  is progressing  to  determine  the
sensitivity of  different  animal  species to ozone at  concentrations  equivalent to
those of  interest  in  primary  standard setting.   This  will  improve  the  use  of
animal data in  predicting human response to ozone.

     Human dose-response studies  are  being  conducted to describe changes in pulmo-
nary function,  biochemistry  and  immunology following  acute exposure  to  ozone and
NOg-  Emphasis  is being placed on evaluating these effects in potentially sensitive
persons, such as asthmatics.  _[n_  vitro  and  in  vivo examinations  of biochemical and
immunological changes  are  being initiated. "The  animal  program  is  emphasizing the
assessment of changes  in  pulmonary  structure  and function, blood, and host defense
mechanisms following  chronic  exposures,  particularly  in  young animals  and those
with pre-existing respiratory conditions.

1983mExplanatjon of Chang_es^from Budget Estimate

     There is no change from the Budget Estimate.

1982 Accompl i.shinenits

     In 1982, the Agency obligated a total  of $5,216,100 for this program, of which
$1,085,200 was  under  the  Salaries  and Expenses  appropriation  and  $4,130,900  was
for extramural  Research and Development activities.

     Develop Health and Welfare Effects  Information  toSupport Review and  Revi-
sion of NAAQS.'  Research  focused  on  providing  human  Jrv3  animal  dose-response
data, especially  data on  pulmonary  function  changes  in healthy  and potentially
sensitive populations  following  oxidant  inhalation.  Accomplishments  during  1982
included results  from clinical  studies  which  identified  otherwise  healthy people
who are "hyperresponders" to  ozone, and  results  from animal  studies which describe
alterations in  blood  Hpid levels  following  chronic ozone  exposure.   An increase
in the level  of circulating blood  lipids  correlates with  increased  risk of arte-
riosclerosis-

     Research to develop better models to extrapolate animal effects data to humans
resulted in the development  of a mathematical model  which predicts  ozone  and N02
transport patterns  in human  lungs  using   rodent  dose-response  data;  and  in  in
vitro and in  vivo  comparisons between human and animal lung tissue and sensitivily"
to damage from  oxidants.

LNVIROJJME1TAL ENGINEERING...AND TECHNOLOGY

1984 Program Request

     In 1984, the Agency  requests  a  total of $2,649,900 an.d 11.5 permanent workyears
for this program, of which  $1,138,900  is for Salaries and Expenses and $1,511,000 is
for Research and Development.   This reflects  decreases  of $33,700 and 51,058,600,
respectively.   This reduction  results  from  the transfer of resources for long-term
exploratory research  to  the  Intermedia program.   This  reduction  also results  from
the completion  of research on capture systems  for spray painting and the completion
of an evaluation of flares  for the petrochemical  industry.   The  research in these
areas are  at the   stage   where  private  industry  can  pursue  further  research.

     Research   and  Assess  Emission Reduction  Technologies to Support Permitting,
NSPSand •Compliance Activities   VOC's are  a  major cause  of the  ozone non-attain-
mentproblem in widespread  areas  of  the  country.  Reliable  data  on demonstrated,
cost-effective and energy-efficient emission reduction technologies for many medium
and small  sources  of  VOC's  are  lacking.   Research on  optimizing  VOC  reduction
technologies such as  carbon  adsorption, catalytic  oxidation  and  thermal  oxidation
will  be continued  for a  broad range of  sources  to  support the  development of  NSPS
and the establishment of SIP's,
                                        A-17

-------
     Since NOx  is  a primary  pollutant,  the regulations  must  be periodically  up-
dated.  Therefore, the  research  and  assessment of NOX emission  reduction  technol-
ogies are needed.  Prior  research  has proven that combustion  modification methods
can be  effective  for  controlling  NOX  as  well  as  other emissions.  Thus,  these
methods for  reducing  NQX  emissions   and  improving the  performance  of  industrial
furnaces will be  evaluated.   Specifically, a method  for NO* control and  both  ,MOX
and SOX  control  will   be   evaluated;  options  of  infurnace  (post-flame)  reburm'ng
for NOX control  on gas, oil and coal-fired bench scale combustors will  be assessed;
and an evaluation of a  coal pellet stocker technology  for field  use  with heavy-oil
fuels will be completed.   Combustion  modification  methods applicable to  industrial
glass furnaces  will  be evaluated  for this  industry.   The  evaluation  of  a  heavy
oil, low  MOX burners   will  be  completed  at  pilot-scale.  The results  will  be
evaluated against a full-scale  evaluation in conjunction with Industry  (100  x  10°
BTU/hr) to determine if cost and efficiency  can be improved  by using EPA developed
technology, thereby making regulatory compliance more reasonably  achievable.

     Fundamental research   to  develop a technical   basis   for estimating  achievable
NOX emissions from  current and  future combustion  equipment  and  fuels  and  research
on the formation and destruction of NOX wil'l  be conducted  to support  the development
of emerging emission reduction  technologies.  During  1984,  research  on understand-
ing the  controlling chemistry  and  mixing  processes  of   in-furnace, NOX reduction
(reburm'ng) as applied to   oil-fired furnaces will  be  pursued for process equipment
which typically burn heavy  residual  fuel  oil.   This  research supports the develop-
ment of an industrial  boiler NSPS.

1983 Program

     In 1983, the  Agency   is  allocating  a  total  of  $3,742,200  and  11.8 permanent
workyears to this program,  of  which  $1,172,600 is under  the Salaries  and  Expenses
appropriation and  S2,569,600  is  for extramural  purposes under the Research  and
Development appropriation.

     Research and Assess Emission Reduction  Technologiesto  Support  Permitting,
NSPS and Compl 1 a'nce Activities.  VOC  emission  reduction  measures; for  which evalu-
atTons'afebeingconductedinclude  carbon  adsorption,  thermal   oxidation  and
catalytic oxidation.  Research  on  capture systems (including hoods) is  being com-
pleted as is  the  evaluation of flares for  the  petrochemical  industry.   Collection
of emission data is being  continued  for  metal  coating operations and  on inhalable
particulates from metallurgical  sources.

     In the  NOX  emission  reduction  areas,  combustion  modification  methods  for
reducing NOX  and  improving  the performance   of  industrial  furnaces  are  being
assessed.  Research on the heavy oil, low NOX burner  is being conducted.   Fundamen-
tal combustion  research  is  focusing on   elucidating  the important  intermediates
and reaction  paths involved  in  the  formation  of   NOX  in fossil  fuel  firing.

1963Explanation ofChangesfrom Budget Estimate

     The net increase of +$-1,377,800 results from the following action:

     -Restructuring.  (+$1,377,800)   The  Congressionally  approved  restructuring
eliminated the  Gases  and  Particles,  and ?, Oxidants -  Energy program elements  and
moved them  into  the Air  program elements.   This  allows   for better  management and
accountability of resources  because  both  Energy  and  Air have  the  same  regulatory
program effort and the  end products are air regulations.   The change to the Salaries
and Expenses appropriation was +$410,900 and  the change to the Research and Devel-op-
ment appropriation was +$966,900.
                                         A-18

-------
1932 Accomplishments

     In 1982, the Agency obligated a total  of 52,140.,200 for this program, of which
5565,200 was under  the  Salaries  and Expenses appropriation and  $1,575,000  was for
extramural purposes under the Research anil Development appropriation,

     Researchand Assess Emission Reduction  Technologies  to   Support  Permitting,
HSPS and Compliance Activities.  Research  focused  on   collecting emission  data  on
metal coatirigoperati bnS ' arid  on  inhalable  particulates from metallurgical  sources.
Research also focused on evaluating emission  reduction technologies  such  as carbon
adsorption, thermal oxidation, catalytic  oxidation, capture systems and flares,   A
pilot-scale testing facility for flares was constructed.

ENVIRONMENTAL PROCESSES ANDEFFECTS

1984 Program Request

     The Agency  requests  a total  of  $3,943,300 and  19.3 permanent  workyears for
thi.s program, of which  31,763,100 is  for Salaries and  Expenses and 52,180,200  is
for Research and Development.  This reflects an increase of 5321,300 and a decrease
of 5801,800, respectively.   The net decrease  results from  the following:  an overall
Increase in the  ozone crop loss assessment program which results primarily from a
transfer of  resources  from the  gases  and particles crop loss  assessment program,
the completion of biogenic emissions research and the  transfer of long-term explor-
atory research resources to the Intermedia program.

     De ve 1 op  a nd  V a 1 i da te  Air Qua1i ty Models to Support  Imp 1 erne n t a t i o n, Ma i rite -
nance,'" arid Enforcement jaf.NA^QS   The  pr i ma ry= Toe u s o f	th is' p rb gr am is the de ve T op -
ment of air  models 'needed 'by' OAQPS,   the  Regions, and  State,   local  and industry
officials.  Urban scale  air  quality  simulation models for  ozone will  be  validated
and refined fo.r  dissemination  to the  user  community,   In order to address recently
observed inadequacies in the  urban modeling predictions, the program  will  develop
a chemical mechanism that  quantitatively describes ozone  formation  in the ambient
air.  Research  to  develop a  more  accurate  chemical  mechanism  that  describes the
atmospheric chemistries of major VOCs,  predicts  the effects of organic composition
changes on  ambient  ozone  and  accurately  predicts  formation  of  M02  and  other
non-ozone oxidants  will  be conducted.   Improving  the  ozone chemistry  will result
in more accurate urban  model predictions  and  thus will  allow  for the development
of more cost-effective oxidant control strategies.

     A second generation regional  scale model for ozone  will .be developed.  Major
emphasis will .be placed  on testing the  accuracy  of the regional ozone model devel-
oped from  the  Northeast Regional  Oxidant Study  (NEROS).  The  major deficiencies
in the  various  modular  components  of the regional model,  such  as  the chemistry,
meteorology and  emissions  submodules,  will  be  identified  and  corrected.   The
model will  allow decision-makers to evaluate  the  impact of oxidant control  plans
on individual  cities by  determining   the contribution   of  regional  pollution  to
urban areas.  In addition,  the regional model  will  be  adapted  for  use in dealing
with other regional  scale  pollution problems  such as  particulates and visibility.

     Develop Health and Welfare Effects Information to Suppcrt Review and  Revision
of HAfljjSlThrough the NatTonal  Crop  Loss ^Assessment  Network  (NCLANT^the' economic
Impacts of ozone on the yield  of major  crop  species  (covering  90%  of the United
States crop acreage) will be  determined  under  conditions  that are  typical of ambient
environments.  This .data will be used  to  build on  the  dose-response data  collected
previously and to conduct a national economic  assessment  of ozone impacts on crop-
loss.  Since variations in environmental  factors  such  as climate and soil moisture
can influence the  effect  of  a  given  air pollution  level  on  agricultural  crops,
research will address the interactions of these factsrs to allow a region-by-region
assessment of the economic impacts of  oxidants in,future years.
                                         A-19

-------
J.98JProgram

     In 1983,  the  Agency Is  allocating  a  total  of 54,423,800  and  20.9 permanent
workyears to this  program,  of which $1,441,800 is  under  the  Salaries  and Expenses
appropriation and  $2,982,000  is  for extramural  purposes under the  Research  and
Development appropriation.

     Develop  and  Validate  Air  Quality Models to Support Imp!ementation. Mainte-
nance,and Enforcementof KAAQS.A  number  of urban  scale  air  quality  models  for
ozone are being developed and"validated  for use in the development and implementa-
tion of SIPs.  Studies of several existing chemical mechanisms suggest that current
chemical mechanisms used in  air  quality models can  result  in erroneous ozone predic-
tions and could be  introducing  errors when used  in air  quality models,  thus,  the
najor research effort  in 1983  will  focus on  smog chamber studies  where mixtures
of nitrogen  oxides  and  VOCs  (including  aromatic  compounds)  will  be irradiated to
form ozone.

     In addition, air quality data  obtained from  a major field  sudy in the North-
east is  being  used  to  validate   a  regional  scale  photochemical  model.   When
validated, the regional  photochemical  model  is  expected to  play  a major  role in
assessing the overall strategies for  oxidant  control  for large areas of the United
States.

     Research studying the contribution  of  biogenic emissions to the total  ambient
burden of  ozone  is  being completed.   A model,  laboratory  and  field  program is
being conducted to develop emission  factors  representing major biogenic compounds;
to assess the  transport and  transformation  processes; and to  calculate the poten-
tial amount of ozone that forms as a result of the biogenic emissions.  This infor-
mation on biogenic  emissions  will   be used  in assessing  the  regional  inventory of
VOC levels  that   potentially  affect  major  urban  areas  and  in  developing  more
adequate control  technologies for urban  areas.

     Deve 1 op Health .and Melfare Effects  Infonnation to Support. Review and  Revis1 on
of NAAQS..  FieTcFTresearch on  the development  of a nationwide  data Kse through	the"
NatToriaT Crop  Loss  Assessment  Network  (NCLAN) is being  conducted to  assess  the
impact of  ozone  on  the yield  of  major  agronomic  crops.  Dose-response  data  are
being developed for a wide variety of crop types and exposure doses.

1983 Explanation of Changes from Budget  Estimate

     The net increase of +$416,400 results from the following actions:

     -Congressional Actions.  (+$416,400)  EPA's application of Congressional action
to this" activity  resulted' in the following changes.                              '

     (+366,400)  This increase  includes  +.$66,400  of the S10.5 million Salaries and
Expenses .add-on  which   supports  the 480  additional  permanent  full-time  workyears
provided to the Age.ncy.

     (+$350,000)   Congress added +58,526,200 to the .Research and Development appro-
priation for priority activities at the  discretion of the Agency.   This specific
increase supports  the  National  Crop  Loss? Assessment  Network  to  assess  .crop  loss
from ozone exposure for two additional crops.

1982 Accomplishments                                                            , •

     In 1982, the Agency obligated a total of 37,407,700 for this  program, of which
51,509,700 was under the Salaries and Expenses .appropriation and 55,898,000 was for
extramural purposes under the Research and Development appropriation.
                                         A-20

-------
     Develop and Validate Air Quality Models to Support the  Implementation,  Main-
tenance,•and Enforcement :OT ^AAQ|7  THe  '.researcfi  program  fo   developIregional
scale model for ozone continued.   A regional model was formulated and tested against
portions of the Northeast Regional Oxidant Study (NEROS) air data base and improved
for accuracy where  necessary.   The  regional  model, when  fully developed  and vali-
dated, can  be  used  by State  and Regional  officials to  calculate the  extent of
ozone transport from  one  area  to  another.   While  the  regional  model was formulated
to predict regional  ozone levels, it  was designed  to  be used  for modeling regional
scale fine particles, sulfate .concentration, and transport as well.

     Develop Heajth and Welfare Effects  Information to Support Review  and Revision
of NAAQ'S.  FieTcTahd laboratory research  addressed  the role of  environmental factors
TTncTudTng soil moisture)  on  the  growth  and  yield  responses  of  crops  to  ozone,
since these factors  greatly  influence the  effects  of air pollution.  The  data  from
previous field  research  was organized  into  dose-response  functions.   Using these
data, technical information and assistance was provided to the Agency's program and
Regional Offices,  and to  State and local  governments,  on damages  associated with
the effects of  oxidants  an economically important agricultural crops.  An economic
modeling approach was initiated to assess the costs  associated  with ozone pollution.
                                         A-21

-------
                                         AIR

                               Hazardous Air Pollutants
                                ACTUAL
                                 1982
BUDGET
ESTIMATE
  1983
CURRENT
ESTIMATE
  1983
ESTIMATE
  1984
 INCREASE +
 DECREASE -
1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Scientific Assessment
 Salaries 4 Expenses
 Research a Development
                       TOTAL
Technical Information &
Liaison
 Salaries 4 Expenses
 Research 4 Development
                       TOTAL
Monitoring Systems &
Quality Assurance
 Salaries & Expenses
 Research 8 Development
                       TOTAL
Health Effects
 Salaries S Expenses
 Research 8 Development
                       TOTAL

Environmental  Engineering
& Technology
 Salaries & Expenses
 Research 8 Development
                       TOTAL

Environmental  Processes
& Effects
 Salaries 8 Expenses
 Research & Development
                       TOTAL

TOTAL;
 Salaries & Expenses
 Research & Development

Hazardous Air          TOTAL
Pollutants
PERMANENT WORKYEARS
Scientific Assessment

Technical Information 8
Liaison
$888. 2
$501.8
$1,390.0
$91.5
$1.8
$93.3
$2,021.4
$1,666.4
$3,687.8
$1,179,9
$1,391.8
$2,571.7
$197.8
$524.7
$722.5
$291.6
$1,200.1
$1,491.7
$4,670.4
$-5,286.6
$9,957/0
18.6
1.4
$1,333.2
$675.0
$2,008.2
$85.9
$85.9
$1,729.9
31,013.9
$2,743.8
$1,476.1
S865.8
$2,341.9

$316.6
$498.0
$814.6
$4,941.7
$3,052.7
57,994.4
21.0
1.2
$1,359.9
$675.0
$2,034,9

$1,729.9
$1,513.9
$3,243.8
$1,609.0
$865.8
$2,474.8

$316.6
$498.0
$814.6
$5,015.4
$3,552.7
38,568.1
24.0

$1,481.1
$1,775.0
$3,256.1

$1,847.2
$1,355.0
$3,202.2
$1,804,0
$753.5
$2,557.5

S321.2
$542.3
$863.5
$5,453.5
$4,425.8
$9,879.3
24.0

$121.2
$1,100.0
$1,221.2

$117.3
-$158.9
-$41.6
$195.0
-S112.3
$82.7

S4.6
$44.3
$48.9
$438.1
S873.1
$1,311.2


                                     A-22

-------
          AIR

Hazardous Air Pollutants

 ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
  1982    ESTIMATE   ESTIMATE    1984    DECREASE -
            1983       1983             1984 YS 1983

Monitoring Systems &
Qual i ty Assurance
Health Effects
Environmental Engineering
& Technology
Environmental Processes
& Effects
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems &
Quail ty Assurance
Health Effects
Environmental Engineering
& Technology
Environmental Processes
& Effects
TOTAL WORKYEARS
(DOLLARS U
32.6
20.6
2.3
6.9
82.4

23.7
1.9
37.3
22.3
5.3
6.9
97.4
i THOUSANDS;
30.1
21.1

3.9
77.3

29.6
2.1
34.0
23.7

3.9
93.3
1
29.6 . 29.6
25.1 25.1

3.9 3.9
82.6 82.6

32.2 32.6 .4

33.5 33.5
27.7 27.7

3.9 3.9
97.3 97.7 .4
        A-23

-------
                                        AIR


                              Hazardous Air Pollutants


                                                               Current
                                                      Actual    Estimate    Estimate
MajorOutputs/Milestones                               1982      1983        1984

Prepare Health and Risk Assessments

-  Complete 9 screening assessments.                   3/83      3/83
   (Sci. Assess.)

-  Complete 7 full assessments for use in
   listing decisions                                   6/83      6/83
   (Sci. Assess.)

-  Complete sixteen full assessments for                         3/84        3/84
   use in listing decisions
   (Sci. Assess.)

-  Complete fourteen full assessments for
   use in listing .decisions (Sci. Assess.)                                   9/95

Develop Information on Health, Emission
Reduction Technologies, Monitoring,
and Transport and Fate

   Report on intercomparison of methods at
   Non-Criteria Pollution Center                                 9/83        9/84
   (Monitoring)

-  Report on organic compounds in indoor air           9/83      9/83
   (Monitoring)

-  Journal article on the comparative mutagenic
   and carcinogenic activity of sources                8/83      8/83
   (Health)

-  Journal article on the effects of thirteen
   HAPs on host defense and metabolism in
   aniraals (Health)                                    1/84      1/84        1/84

-  Determine wet and dry removal
   of HAPs (Env. Processes)                            4/84      4/34  '   _   4/84

-  Determine decomposition rates
   for HAPs (Env. Processes)                           6/85      6/85        6/85

-  Report on field tests for catalytic  >
   oxidation (Env. Technology)                        12/83

-  Report on measurements of emissions                                       » •
   front a ferroalloy production facility              12/83
   (Env. Technology)

Provide Quality Assurance Support

-  Issue Standard Reference Materials
   for 2 HAPs per year from OAQPS priority
   list (Monitoring)                                   9/82      9/83        9/84
                                        A-24

-------
                                        AIR


                              Hazardous Air Pollutants


Budget Request

     The Agency requests  a total  of  $9,879,300 and  82,6  permanent wor.kyears  for
1984, an increase  of SI,311,200 from  1983.   Included in this  total  is  $5,453,500
for Salaries  and  Expenses  and  34,425,800 for  Research and  Development, with  an
increase of  5438,100  and $873,100 respectively,   this increase  is  in  the  scien-
tific assessment program element.  In  addition,  this increase  is  partially  offset
by the transfer of  5297,100 in  exploratory  research funds to  the Intermedia  pro-
gram.

Program Description

     The Hazardous Air  Pollutants  (HAP)  research  program  responds to the  regula-
tory needs  of  the  Clean  Air  Act under  Sections  lll(d)  and  112.   The  program
addresses:  (a)  an  assessment of the  human health  risks  associated with exposure
to certain potentially  hazardous chemicals  in  the  ambient  air;   (b)  the sources,
concentrations, and transport and  fate of these  chemicals;  and  (c)  the technical
feasibility and costs  of  reducing human exposure  to those chemicals.   Chemicals
are identified  and screened to  determine  if  they  warrant prioritization  for health
assessment consideration.   The   HAP  program  also  includes   resources  to  provide
quality assurance support  to assure  that the collection  of  data  is  of  acceptable
accuracy and precision.  The following objectives support these goals:

     Objective  1.	Prepare_ HeaHh and Risk  Assessments to  SupportRegulation	of
Hazardous Air Polllftarfts.  Tn'FTFficFW"ResearcTi anfl~Development IBRDT"responds^tb
the needs  of the'"'Offic.e of Air Quality Planning and  Standards (OAQPS)  to conduct
chemical-specific risk  assessments.    These   assessments   provide the   health  and
environmental basis  from  which   a  determination  can  be made  if  the  exposure  to a
pollutant can  reasonably  be expected  to  result in  irreversible  or  incapacitating
reversible illness.   The  assessments   .are  then  combined with  OAQPS   preliminary
exposure analyses to  provide quantitative estimates of  the  degree  of  population
risk and disease incidence.

    Objective,2.  Develop InforTnat:ion on Health,  ^mission  Reduction Technologies,
Mpn1'toT^"9"V~"iffy"jnfiispp'rE	anct	 Fate W Support	»AP	Retaliatory Activities.  EfiT3er
Wis objective, ORD provides the scientific information to UAQf'S on what contaminants
are present  in  the air;  their  chemical  concentration,  transport, transformation,
and persistence in the  atmosphere; and the nature of their adverse health effects.
This information  provides   the  basis  for decisions made  during the   preliminary
exposure analysis  as to  whether  or  not  risk  assessments  need  to  be  conducted.
Research is  conducted  in  response to  information  needs that  have become apparent
during the production  of  the   exposure  analysis  and health  assessment  documents.

     Objectivei_3_.  Provide QujlityAsj^              of  Hazardous  Air Pollutants
        RelpfreW                             activity pfQVKies^'s'taMar^rTeTel'ence
materials  that  permit  decisions  to   be  made  with   confidence  that  the  research
results are  not spurious and that chemical and physical determinations of pollutant
fate, transport, and transformation are'not in error.

SCIENTIFICASSESSMENT

1984 program Request

     The Agency requests  a  total  of  S3,256,100  and 24.0 permanent  workyears  for
this program,  of  which $1,481,100 is  for Salaries  and  Expenses  and SI,775,000 is
for Research and Development.   This reflects .an-increase of $121,200 and $1,100,000
respectively, to  intensify  efforts to prepare health  assessments for  use by OAQPS
in hazardous air  pollutant  (HAP) listing decisions.
                                       A-25

-------
     Prepare Health and Risk Assessments to Support  Regulation  of  Hazardous  Air
Pollutants.  The current  Agency  strategy  for  evaluating hazardous "air  pollutants
calls for assessing the toxicity  of  thirty-seven chemical substances, and  for re-
viewing the health  basis  for existing regulations  for  three  other  substances.  The
length of  time  to  complete  an assessment,  from  eighteen  to twenty-four  months,
depends on  several  factors:  the  severity  of toxicity,  quality  and  amounts  of
scientific data  available,  and  the  diversity  of  scientific  opinions  on  how  to
assess the compound1'.?  potential  risk.   By  accelerating  the  assessment  program  we
expect to have  complete assessments for  the  entire  list of  chemicals  referenced
above ready for  Science Advisory  Board  review, and OAQPS use, by  the end  of 1985.
Specifically, sixteen   comprehensive  assessments   begun   in  prior  years  will  be
completed in 1984 and  fourteen new assessments initiated  in 1984 will  be completed
in 1985,  Also,  a  re-evaluation  of  the  health  basis for  one regulated  chenical
(beryllium) will be completed.
     /
1983 Program

     In 1983, the  Agency  is allocating  a total  of 52,034,900 and  24.0 permanent
workyears to this program,  of  which  $1,359,900 1s  under  the Salaries and  Expenses
appropriation and  $675,000   is  for  extramural  purposes  under  the  Research  and
Development appropriation.

     Prepare Health arid^ Risk Assessraents^ to  Support  Regulation   of  Hazardous Air
Pollutants,  seven Assessment?begun	fn prioryears	are being = completed7While six
new ones  are  being Initiated.  A review  of the  health  basis for  one  previously
regulated pollutant (mercury)  is  being  started.   Refinements  to the  assessment
methodologies, especially for carcinogenicity are being completed.

1983 Expl anation of Changes  from Budget £_stitnate

     The net increase  of +526,700 results from the following actions:

     -Congressional Action.   (+$265,700)  This  increase  includes  +5265,700  of the
$10.5 million  Salaries and Expenses  add-on  which  supports  the 480  additional
permanent full-time workyears provided to the Agency.

     -Reprogramniings.    (-$239,000) During  the development  of the  operating  plan,
several repfogr'ammings  were  made  to this  activity which are  not  reportable under
the Congressional  reprogramraing  limitations.   These  changes  resulted  in   a  net
decrease of -$239,000  to the Salaries and Expenses appropriation.

1982 Accompji shments     -   .

     In 1982, the Agency obligated a total of  $1,390,000 for this program, of which
5888,200 was  under  the Salaries  and Expenses appropriation  and  $501,800  was for
extramural purposes under the Research and Development appropriation.

     Prepare Health and Risk .Assessments  to   Support  Regulation  of Hazardous Air
Pollutants^Out of twelve  health assessments begun  in prior  years  nine were sub-
mi ttea for public  comment via  Federal  Register notice and SAB review.   One  of the
nine was  cleared by the  SAB.   In addition, eight  new assessments were initiated.
An effort  to  refine existing health  assessment methods  (specifically for  carcino-
genicity) were  initiated. •

TECHHICAl INFORMATiON  AND LIAISON

1982 Ace ompl1shments

     In 1982, the  Agency  obligated a total  of 593,300 for this program,  of which
591,500 was  under  the Salaries  and  Expenses appropriation  and  $1,800  was  for
extramural  purposes   under the   Research   .and  Development  appropriation.   This
activity, which  supports  research  programs   across  all  media,   was consolidated
into the  Intermedia program in 1983.   Thus, the P rog ram De scrip ti on, Igg^^rograni
Request,  1983 Program,  and  1982 Accomplishments  nariralTvesections  appear""fliereV
                                       A-26

-------
MONITORING SYSTEMS AND QUALITY ASSURANCE

19.84 Program Request

     The Agency requests  a total of  53,202,700 and  29.6  permanent workyears  for
this program of  which $1,847,200 is  for  Salaries and Expenses, and 51,355,000  is
for Research and Development.   This  reflects an increase of 3117,300 and a decrease
of $158,900  respectively.   This net  decrease  reflects  an  Increased  emphasis  on
developing new monitoring methods,  which was offset by the  completion  of indoor air
characterization studies and the transfer of  resources  for exploratory  research  to
the Intermedia program.

     Develop Information on Health,  Emission Reduction Techno! ogies, Mom tori n£ and
Transport ami Fate to Support HAP Regulatory ^ctivlfles.'  Iri response  to 5He  need
for a more coordinated effort to monitor non-criteria contaminants  at the Regional,
State, and  local  level,  ORD  will   maintain  a  non-criteria  monitoring  station  in
Philadelphia and  plans  to expand the program  to  establish three  other  stations.
These stations will  function  as a  focal  point for  the  development and evaluation
of field  and  laboratory methodology  to permit the  characterization  of  urban  and
non-urban atmospheres and will provide the mechanism for any trend  analysis requir-
ed.  Also, these stations will allow Regional, State and local  agencies  to evaluate
their existing methods and will  provide a training  center  for  personnel.  Methods
selected for study will include direct gas chromatographic  analysis and  the concen-
tration of  contaminants  using  selective  polymer  adsorbents   (e.g.,  Tenax)  and
cryogenic trapping.

     Stationary source methodology  will  be  evaluated and  validated  to  support the
regulatory activity.   This  will involve  measurement  of instrument drift,  estab-
lishing control limits,  defining out of  control  limits and specifying  corrective
action and alternate methods to minimize down time.

     In ambient  air,   the  focus will  be  on  developing  and  assessing  sampling/
concentration methods  and  developing advanced  methods  of   analysis.  The advanced
methods to be  evaluated  for  specific HAPs  are  Mass  Spectrometry/Mass  Spectrpmetry
(MS/MS), Tuneable  Atomic Line  Molecular  Spectrometry   (TALMS)  and gas  chronato-
graphy/Fourier Transfer Infared Spectrometry (GC/FTIR).

     Provide Quality Assurance Support for HAP Program Requlrements.  A  repository
for reference samples will  be  expanded and maintained.Quality Assurance guidelines
will be  developed  detailing   the procedures and  how to apply  these  procedures  to
specific hazardous  air  pollutant problems for use by Region,  and  State,  and local
laboratories.  Audits  of  Regional >  State,  and  local government laboratories will
be performed.   Standard  Reference   Materials   (SRM's)  traceable  to  the  National
Bureau of Standards (NB.S) will be developed.

1983Program

     In 1983.,  the  Agency  is  allocating a  total  of $3,243,800  and  29.6 permanent
workyears for this program, of  which  $1,729,900 is under the Salaries and Expenses
appropriation, and SI",513,900  is under  the  Research  and Development appropriation.

     Develop Information on Health, Emission  Reduction  Technologies,  Monitoring,
and Transg^' aWAT a cooperative
effort;," the flrslf noli-critefi₯ monitoring station" Ts being established in Philadel-
phia to  provide  for the characterization of  an urban,  industrial  pollutant  atmos-
phere.   In 1983, we are conducting  a  study to characterize the types and concentra-
tions of indoor air po1lutio"n, especially outgassing  of  building  materials in  build-
ings that  the  public has  access to (e.g.,  office buildings,  hospitals,  schools).
The results of this study are being compared to previous studies.
                                       A-27

-------
     Provide Quality  Assurance   Support for  HAP   Program  Requirements.   SRM's   are
being validated and issued for th"e methods mentioned  above  (forraaldephyde,  acryloni-
trile).  The sample repository is being maintained  and  quality  assurance  performance
audits are  being  conducted  for  Regions and  local   governments   as   requested.
SRM's for asbestos will  be issued in  1983.

1983 .Explanation of Changes  from Budget Istimate

     The net increase of +$500,000 results frofn the  following  action:

     -CongressionalAction.   (+$500,000)  Congress added +58,526,200 to the Research
and Development  appropriation  for priority  activities at the  discretion, of  the
Agency.  This  specific  increase  supports  characterizing indoor air which  was  tar*
geted as a  high  priority  action  by Congress  in the  Conference Report on  our  1983
Appropriation's Bill.

1982 AceompVi sjvnentS

     In 1982, the  Agency obligated a  total of $3,687,800, of  which  52,021,400  was
under the Salaries  arid  Expenses  appropriation, and  $1,666,400 was  for  extramural
purposes under the Research  and  Development appropriation.

     Develop Inforaation on  Health. Emission
and Transport'" ajar Tate ^W  ^Support ^^~^1^4^ry. J^Hy!'^'^'   In	support"~oT"We
stationary source methodology, a strategy document delcribingTampI ing and analysis
techniques for  specific  industries was prepared  for  OAQPS.   The laboratory  study
report on formaldehyde completed final peer review.

     ORD conducted  a  pilot  study in  the  Washington  O.C.  area to characterize  the
types and concentrations of  indoor air pollution.   In  the  selection  of the types of
buildings used in this study we  were  assisted by  the National  Institute of Building
Sciences (NIBS).  NIBS  also  helped determine the  types of building  materials  used
in the buildings selected.

     A cryogenic  sampler  was developed to enhance  our ability  to analyze ambient
air samples.   This instrument,   which  permits  trapping  of   volatile  organics  at
different temperatures,   allows  much   greater precision   than  that  obtained  using
fixed temperature trapping.

     Provide Quality Assurance Support forHAP   Progran Requirements.  Benzene and
perch! oroethy 1 ene 'SRW s  were i ssued.   Four audits'1were conducted  on  tPA source test
contractors.  A  report  on the joint  NBS/EPA  Asbestos Standard Meeting  was issued,
A report  was  issued  in  the Laboratory  Intercomparison Program  for  air  pollution
measurements.  The  results  indicated acceptable  levels  on precision  and  accuracy
for the audited laboratories.

HEALTHEFFECTS

1984 Prog ram, Requ es t

     The Agency  requests  a  total  of  $2,557,500  and  25.1 permanent  workyears  for
this program,  of which  SI,804,000 is for Salaries and Expenses, and  5753,500 is
for Research and Development.  This reflects  an increase of $195,0.00 and a decrease
of 3112,300  respectively.    This  net  increase  results  from  increased  intramural
emphasis on  dose-response  studies of the respiratory  toxicity  of  organic  vapors
and on the development of better  animal  models to predict  respiratory and neurologic
toxic effects  of HAPs,  and  a decrease in extramural  resources  due  to  a transfer
of exploratory research funds to the   Intermedia program.
                                       A-28

-------
     Develop Information on Health, Emission Reduction Technologies, Monitoring and
Transport and Fate to Support HAP Regulatory Activities.The  health  research pro-
gram for  this  objective has  three goals: jl)" to  develop  and  validate  methods to
produce dose-response  data  on  the  toxic  effects  of HAPs;   (2)  to  produce dose-
response data on the toxic effects of HAPs; and (3) to develop models which Improve
our ability to use dose-response data in risk assessments.

     Methods to be developed  will  be designed to provide dose-response data on the
genetic, developmental,  and  neurotqxic effects  of HAPs.  Emphasis will  be placed
on the  toxic  components  of  gaseous-aerosol  complex  mixtures.  Chemicals  will  be
identified which  adversely  affect reproduction  and/or  development,  or  which have
toxic effects  upon  the  nervous  system.   Studies  will  provide information  on  the
toxicity of airborne chemicals  presumed  to  be HAPs.   This  information will  contri-
bute to risk assessments needed by QAQPS to identify and regulate HAPs.

     In dose-response toxicological  research,  chemicals selected by  OAQPS  will  be
studied to  determine  their   toxicity  to  respiratory  mechanisms.    The  mutagenic
and carcinogenic activity of  five  potential  HAPs  will  be  determined.  The effects
of chemicals suspected  as being  hazardous to the nervous  system will  be  studied
because, due to their chemical structures, many potential HAPs evidence early nerv-
ous system effects which may besone progressively worse with increasing dosages and
which are likely to be chronic effects.

     Animal models of respiratory physiology and function will be developed to pro-
vide more reliable methods  for  estimating doses to critical  lung  tissues.   Models
of neurologic toxicity will  be developed involving physical, chemical  and behavior-
al tests  to  predict human  responses to insult   from  potential  HAPs.   Doserre-
sponse data are needed  for  use  in risk  assessments of  HAPs,  and  better extarpola-
tion models  will  Improve the use  of such  data  in  the risk  assessment  process.

1983 Program

     In 1983,  the  Agency is  allocating  a  total  of  $2,474,800 and  25.1 permanent
workyears to this program, of which $1,6.09,000 is under the  Salaries and  Expenses
appropriation,  and $865,800 is for  extramural  purposes under the Research and Devel-
opment appropriation.

     Develop Information  on Health, Emission  Reduction Technologies,  Monitoring,
and Transport  and  Fate  to  Support HAP  Regulatory  Activities.Prior  emphasis
on the  carcinogenic  potential  of HAPs has  been broadened to  include other health
endpoints such  as  mutagenic,  reproductive,  and neurologic effects.  Reports of dose-
response data are forthcoming on the mutagenic potential of ambient air, of organic
gases and vapors in urban ambient air, and  of  ambient air  near stationary  sources.
Bioassay techniques are  also  being  developed which will provide  doseresponse data
more rapidly, reliably, and inexpensively.   The   genetic,  respiratory, and neuro-
logic toxicity  of chemicals selected by OAQPS are being studied.  Biological models
are being developed  which will  provide  better methods  for extrapolating  data  on
genetic toxicology from  animal  tests  to predict  human  effects  as well  as better
methods for extrapolating from observed effects at high doses to those at low doses.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$132,900 results from the following action:

     -Congressional  Action.   (+$132,900)  This  increase includes +$132,900  of the
$10.5 milli.on Salaries and Expenses  add-on which  supports the  480  additional  per-
manent full-time workyears provided to the Agency.

1982 Accomplishments

     In 1982, the Agency obligated a total'of $2,571,700 for this program,  of which
$1,179,900 was  under  the Salaries and Expenses  appropriation, and $1,391,800 was for
extramural  purposes under the Research and Development appropriation.
                                         A-29

-------
     Develop  Information  on  Health, Emission ReductionTechnologies, Monitoring,
and  Transport  and	Fate to Support  the  HAP  Rggu.l^to^y^'fe'tWft'tjes'.    Biiphlsis
was pi aced  on development of  bi oassay s  for Identification arid  screening  of HAPs,
•primarily with carcinogenesis and mutagenesis as ertdpoints.  Studies were performed
to obtain dose-response  data  on HAP  review for support  of regulation development
and review, and the  development of models  was begun to  improve  the Agency's cap-
ability  to  perform  risk  assessments  based on  data  obtained  from  animal  studies.

ENVIRONMENTAL :ENGINEERINS AND TECHNOLOGY

1983 Program

     The research in  this program  has been transferred  to the Air Oxidants program
for 1983,

1982 Accompl1shments

     In 1982, the Agency obligated a total  of $722,500 to this  program,  of which
3197,800 was  under  the  Salaries and  Expenses appropriation,  and 3524,700  was  for
extramural purposes under the Research and Development appropriation..

     Develop  Information on Health, Emission Reductions  Technologies,  Monitoring,
and Transport Ind Fate to Support HAP Regulatory Actfviti'ls.!"n 1982, emphasis  was
'pi ac Id on c oITect 1 rig  enri s s i o n  da ta a nd  aval uVt 1 ng etni s s ion reduction technologies
to assist OAQPS  in  the  review and development of  NESHAPS.   An  evaluation  of  the
effectiveness of catalytic oxidation  in  controlling volatile organic compound  (VOC)
emissions was conducted.  Field tests  for catalytic incinerators  were performed.
The results  indicated that the  technology has significant potential  for reducing
VOCs, but consistent performance was difficult to achieve.   Measurements of emis-
sions from  a  ferroalloy  production  facility  were taken,  and  a  demonstration  and
evaluation of a technology to reduce  emissions was conducted and shown to be  highly
effective and reliable.

ENVIRONMENTAL PROCESSES AND EFFECTS
1984 Prog ram Reque st

     The Agency requests a total  of $863,500  and  3.9  permanent workyears, of which
5321,200 is for Salaries and Expenses and $542,300 is  for Research and Development.
This request  represents  an  increase  of  34,600  and  $44,300  respectively.   This
reflects Increased- emphasis on characterizing HAPs in  the ambient air.

     Develop Information on Health, Emission  Reduction  technologies,  Monitoring,
and T7arisport andjt Fate? ^tp  Support  HAP  Regulatory  Activities.  Research on the
'a tnio spner i c tr a nspbrt ^ tr ahs f o rnia ti on,  a nd f ate  of haza rdou spo 11 u tan ts  will sup-
port the needs of the  Office  of Air  Quality Planning  and  Standards.  Studies using
predictive transport  models  will  identify  innocuous   chemicals  which,  after being
emitted, are chemically transformed into more hazardous air pollutants.   The resul-
tant chemicals will be identified and the  transformation process determined through
simulated photochemical reactions in  smog  chambers.   Research will  be conducted  to
determine the rates  of physical  loss  of HAPs from the atmosphere through dry depo-
sition and wet removal.   The  ambient air'.characterization study in ten urban areas
will continue in  an  effort to describe  the  daily, weekly,  and seasonal  concentra-
tion variations  and the movement  of HAP  from   source to receptor.  A preliminary
study in  this  area  will  provide  information to  enable  researchers  to determine
periods when peak concentrations of HAPs occur.

     Information from these studies will enhance  our understanding of selected HAPs
relative to: determining  trends  for  ambient  volatile  organic  HAPs;  determining  if
additional transport, transformation, and fate studies are warranted; and previding
important input Into developing exposure/risk assessments.
                                          A-30

-------
1983 Program

     In fiscal year 1983, the Agency Is allocating a total of $814,500 and 3.9 per-
manent workyears for  this program,  of which  5316,600 is  under the  Salaries and
Expenses appropriation, and 5498,000  is for extramural purposes under the Research
and Development appropriation.

     Develop Inforroation on Health,  Emission  Reduction  Technologies, Monitoring,
and i ran sport and (• ate to buppo"rT"HOTr Regulatory ActVvYties.kesearch to determine
photol_ytic "decomposition  rates  and  their  rate  of"pKysicVl~loss from the atmosphere
is being conducted.  This research stresses  dry  and wet deposition removal for addi-
tional  HAPs to meet the needs of  the  Office of Air Quality Planning and Standards,
Atmospheric studies to  characterize  the  distribution and  concentration  of trace
volatile organic compounds  are scheduled  in ten major urban  areas  to explain the
daily,  weekly, an.d  seasonal  concentration variations  and to  describe the movement
of HAPs  from  source  to  receptor.  A project  is being initiated  using predictive
structure activity  models to  identify and  screen  those  pollutants  which,  after
being emitted  into  the  atmosphere,   .are  chemically transformed   into  hazardous
secondary products.

1983Explanationof Changes from Budget Estimate

     There is no change from the Budget Estimate.

1982 Accomplishments

     In fiscal year 1982, the Agency obligated $1,491,700 for this program of which
5291,600 was under  the  Salaries  and Expenses appropriation,  and $1,200,100 was for
extramural purposes under the Research and Development appropriation.

     Developj Information on'Heal th.  Emission  Reduction^Technologies, Monitorijng,
andTr.ajisjrcrrX ^nj^                                                    A tfafa "base" wa₯
compiled summarizing  'the  current state of "knowledge  o?volatile organic confounds
in the ambient air  and photolytic decomposition  rates  were determined for a  select-
ed number  of  HAPs.   Research  was conducted on  some  HAPs  having  long atmospheric
residence times  to determine  their  rates  of  physical   loss  from  the  atmosphere
through dry and  wet deposition.  Preliminary ambient  air characterization  studies
were concluded  in  ten urban  areas  for  a  selected number  of potentially hazardous
volatile organic  compounds  as   an  initial  step  towards  mapping   their  natural,
spatial, and temporal  variabilities.   Reaction  rate  and  product formation .studies
were expanded  to  include additional  HAPs in accordance  with the  needs  of OAQPS.
                                       A-31

-------
AIR
Mobile Sources
ACTUAL BUDGET
1982 ESTIMATE
1983

PROGRAM
.Scientific Assessment
Salaries 4 Expenses
Research & Development
TOTAL
Technical Information &
Liaison
Salaries & Expenses
TOTAL
Monitoring Systems &
Qua1 i ty Assurance
Salaries & Expenses
Research & Development
TOTAL
Health Effects
Salaries & Expenses
Research & Development
TOTAL
Environmental Processes
& Effects
Salaries & Expenses
Research & Development
TOTAL
TOTAL:
Salaries & Expenses
Research & Development
Mobile Sources TOTAL
PERMANENT WORK YEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Processes
(DOLLARS
. $24.7
S24.7
$34,3
$.34.3
5704.8
5572.2
SI, 277.0
SI, 602. 8
$3,492.6
$5 :, 095. 4
$791.7
S965.5
51,757.2
S3, 158. 3
$5,030,3
$8,188.5
.5
.7
10.9
10.7
12.5
CURRENT ESTIMATE INCREASE +
ESTIMATE 1984 DECREASE -
1983. 1984 VS 1983
IN THOUSANDS)
S50.2
S25.0
$75.2
$21.0
$21.0
$664,4
51,039.7
$1,704.1
$816. 4
$552.0
$1 , 358. 4
$482 ,5
$825,2
$1,307.8
$2,034,6
$2,441.9
$4,476,5
1.0

7.0
7.7
6.2
$50.2
$25.0
$75,2

$664.4
$1,039.7
$1,704.1
$816.4
$1,552.0
$2 , 368 . 4
$482.6
$1,175.2
$1,657.8
$2,013,6
$3,791,9
$5,805.5
1,0

7,0
6.1
6.2
S51.7
$425.0
$476.7

$545,5
$338.4
$883.9
$565.3
$256.7
$822.0
5496.9
$403.9
$900,8
$1,659.4
$1,424.0
$3 , 083 . 4
1,0

5.3
3.7
6,2
SI. 5
$400. 0
$401 . 5

-$118.9
-$701,3
-$820.2
-$251.1
-$1,295.3
-$1,546.4
$14,3
-$771.3
-$757.0
-$354.2
-$2,367,9
-$2,722.1


-1.7
-2.4

& Effects
TOTAL PERMANENT WORKYEARS
35.3
21,9
20.3
16.2
-4.1
                                     A-32

-------


AIR

Mobile Sources


TOTAL WORKYEARS
Scientific Assessment
Technical Information 4
Liaison
Monitoring Systems &
Quali ty Assurance
HealtH Effects
Environmental Processes
ACTUAL
1982
.{DOLLARS
.5
1.9
14.1
14.3
18.3
BUDGET CURRENT
ESTIMATE ESTIMATE
1983 1983
IN THOUSANDS)
1.0 1.0
.1
11.0 11.0
11.4 8.8
12.2 12.2
ESTIMATE INCREASE +
1984 DECREASE »
1984 VS 1983

1.0

8.0 -3.0
7.4 -1.4
12,2
& Effects
TOTAL WORKYEARS
49.1
35.7
33.0
28.6
-4.4
                                      A-33

-------
Page Intentionally Blank

-------
                                          AIR
                                     Mobile Sources
Major Outputs/Milestones

Assess the Health Risks and
Exposure to Carbon Monoxide

-  Complete CO criteria document
   (Scientific Assessment)

-  Provide journal article on
   validated equations predicting
   COHb formation during CO
   inhalation at rest and exercise
   (Health)

-  Provide journal article on pre-
   anginal  events of left ventri-
   cular function in patients with
   ischemic heart disease exposed
   to CO (Health)

-  Development of hybrid personal
   exposure monitor combining data
   logger and CO sensing cell
   (Monitoring)

-  Measure personal  afr and breath
   CO of residents of Washington,
   D.C. and Denver (Monitoring)

Assess Health- Risks  and Exposure
to Unregulated Mobile Pollutants

-  Provide final report on intratra-
   cheal  cancer studies using diesel
   exhaust materials (Health)

-  Provide journal article on target
   organ metaboli sm/genotoxici ty of
   nitro-PAHs found  in-diesel
   particles (Health)

-  Provide journal article on dermal
   exposure to diesel extracts
   (Health)

-  Determination of volatile
   organic compounds in gasoline
   fueled vehicle emissions
   (Env.  Processes)
Actual
 1982
Current
Estimate
  1983
 6/85
 6/85
 8/82
 9/84
  6/85
  6/85
Estimate
  1984
                             12/86
  6/85
  6/85
  9/84
12/83
10/84
10/84
10/83
 12/83
 10/84
 10/84
 10/83
 12/83
 10/84
 10/84
 10/83
                                        A-35

-------
                                          AIR


                                     Mobile Sources
Major 0utput s/Mi 1 e s to ne s

-  Determination of pollutant
   emission factors for in-use
   tractor-trailers,  buses, and
   heavy duty del ivery trucks
   (Env. Processes)

-  Evaluation of criteria
   pollutant emissions from
   vehicles as a function of
   temperature {Env,  Processes)

-  Analyze activity pattern data
   base for use in general models
   of exposure (Monitoring)

-  Complete risk assessment
   for diesel particulates
   (Scientific Assessment)

Collect and Maintain Data in
Support .Of the Fuel and Fuel
Additives Program

-  Provide report to OMSAPC on
   the use of tier genetic bio>-
   assays in evaluating unreg-
   ulated emissions (Health)

-  Provide journal article on the
   mutagenicity of volatile and
   gaseous organic emissions from
   mobile sources (Health)

-  Provide journal article on new
   methods for short-term genotoxic
   bioassay of mobile source
   .emissions (Health)

-  Issue annual fuel  usage report
   and updated list of fuels and
   fuel additives (Monitoring)

Provide .QA Support for Mobile
Sources

-  Evaluate accuracy and precision
   of CO personal exposure monitors
   (Monitoring)
Actual
 1982
 9/84
Current
Estimate
  1983
  9/84
               9/84
               6/84
              12/84
Estimate
  1984
  9/84
                 9/84
10/83
10/84
12/84
 8/83
 10/83
 10/84
 12/84
  8/84
 10/83
 10/84
 12/84
  8/85
 8/83
                                        A-36

-------
                                         AIR


                                   Mobile Sources


Budget Request

     The Agency  requests a  total  of $3,083,400  and 16.2  permanent  workyears for
1984, a  decrease of  S2, 722, 100  and  4.1  permanent  workyears  from  1983.    Includ-
ed "in  this  total  is  11,659,400  for Salaries  and  Expenses  and 51,424,000  for
Research and  Development,  a  decrease  of  $354,200  and  12,367,900,  respectively.
This net  decrease occurs primarily  in  the  health effects  program  element.    In
addition, the  decrease reflects the  transfer  of 5480,500  in  exploratory research
funds to the Intermedia  program.

Program Description

     Title II  of the  Clean  A1r Act, as  amended  in  1977,  requires  the Agency  to
prescribe emission standards  for carbon  monoxide,  (CO)  hydrocarbons,  and oxides  of
nitrogen for heavy-duty  and light-duty  vehicles.  In order to set justifiable and
cost-effective standards, the Agency  requires  information on the chemical  composi-
tion of  fuels,  fuel   additives,  and  diesel  and  gasoline exhausts.   Also required
is information on  the exposure  of drivers,  passengers  and  the population at large
to motor vehicle  pollutants,  the effects of  that  exposure, and the  risks  of  sus-
taining continued  exposure.  The  Clean  Air Act also requires the Agency to  period-
ically reevaluate  the  adequacy  of   the  National   Ambient  Air Quality  Standards
(NAAQS) for  CO  based   upon  the  most  scientifically   credible  data  available.

     Objecti ve 1 .  Assess the  Heal th Risks and Exposure  to Carbon Monoxide  to  Sup-
port "Review  arTd Rev1 sib'n of ^AATys~"and Motor ^Vehicle  Eroi ssiont  Staridarcfs.  Work  i n
this objective includes  determining population exposure profiles to carbon monoxide
(CO) using personal  monitors  and developing a data  base  for evaluating the impact
of CO  on cardiovascular performance and  neurobehavior  in  normal  and  susceptible
humans.  The  Administrator must  evaluate  the  NAAQS  for  CO  every  five  years  as
provided by Section  109  of  the Clean  Air Act.

     Objective 2.  Assess  the  Heal th  Risks  and  Exposure to Unregulated  Mobile
S ource Pollutants.  Research "in" this area  seeks  to  determine ^"ptitafioh""exp6vsu're
distribution to  pollutants other than CO  such as  polynuclear aromatic  (PNA) orgarncs
and particulates;  characterize  the  gaseous and  partlculate  emissions  from 1n-use
light and heavy  duty  diesel  and  gasoline  powered  vehicles;   refine  existing air
quality models;  and  provide  short-term  testing  guidelines  to  evaluate potential
acute health risks from  unregulated emissions.   The information from these  studies
is needed to assess  risk, 1f any, and  1s  used by the  Office  of Mobile Source Air
Pollution Control  (QMSAPC)  to carry out its mandate  to protect public health  from
vehicle pollutants and emissions as  provided  under Section 202(a)(l) and 202(a)(4)
of th* Clean Air Act.

     Objective 3^.  Collect .and  Maintain ___ Data Jn Supjort  of the Fuel and Fuel Ad-
       "~ Sections \~2li and 3dT(d'r"o?' 'thiFCVean Air  act  require the Environ*-
men t aT Wot ecETo n  Agency (EPA)  to  provide  a  data  base  to determine  whether  the
use of any motor vehicle  fuel  or fuel additive poses an unreasonable risk  to human
health.                                   ;

     Objective 4.  Provide Quality Assurance Support  for Mobil e Sources Program  Re-
qy i rem"e'n"tsT  TTSe Office  57  Research'  and " Oevel opmen t  i s ; requTred  to": ensure that
"all measurement data related to mobile source pollutants are reliable and accurate.
                                          A-37

-------
SCIENTIFIC ASSESSMENT

1984 Prqgram Request

     The Agency  requests  a total  of  5476,700  and  1.0 permanent workyear  for this
program, of which $51,700  is for Salaries and Expenses and $425,000 is for Research
and Development.  This  reflects an increase  of $1,500  and  S400.000 respectively,
which will support the  development  of a  revised Carbon Monoxide Criteria Document.

     Assess the Health  Risks andExposuretoCarbonMonoxideto Support Review and
Reyi si on  of  NAAQS and 'Motor YehicTe^"Si₯slon Ttamfairds'.The  Carbon  Monoxide
Criteria Document wi 11  be updated  and revised.   TfiTs  revision and  update  to the
Carb.on Monoxide Criteria Document is mandated  every five  years by the Clean Air Act.
Work will begin in 1984 and continue  into 1986.

     Assess  theHealthRisksand  Exposureto  UnregulatedMobile Pollutants.   A
final cardhogen riskassessment  on dieselemissions wil 1  be Tssueci utiTizihg the
latest data from the health research  program on diesel exhaust.

     Collect and  Maintain Data in  Support of  the Fuel and Fuel Additives Program.
Gui.delines for T battery  of short-term tests  to make evaluations  of fuel  arid fuel
additives will be proposed.

1983Program

     In 1983, the Agency  is  allocating a total  of 575,200  and  1.0 permanent work-
year to this program of which $50,200 is .under the Salaries and Expenses appropria-
tion, and  S25,pOO  is  for  extramural  purposes  under  the Research  and  Development
appropriation.

     Assess the  Health  Risks and  Exposure to Unregulated Mobile Pollutants.  The
latest" data  developed1by  the"TteaTth   research" program  fn  its Oiese!  Cdmparative
Potency Program  is   being  used  to   develop  an  interim diesel   risk  assessment.

     Collect  and  Maintain  Datain  Support ofthe Fueland Fuel  Additives.  Tier
bioas'say data on fuels "an^Tuel  additives developed by the  health  researclf program
is being reviewed and analyzed with a final  report due in 1984.

1983 Explanation jifChanges, from Budget.Estimate

     There are no changes  from the Budget Estimate.

1982 Accompli shments

     In 1982, the  Agency  obligated  a total  of S24.700  for  this  program,  all  of
which was under the  Salaries and Expenses appropriation.

     Assess  theHealth  Risks  andExposure  to ^Unregulated Mobile  Pollutant
The initial data developed  under theBieseT Comparative 'Potency Program  was  eviTu-
ated by  participants  in   workshops  and meetings.   Preliminary estimates   of  the
carcinogen risk from diesel exhaust were made.

TECHHjCAL_INFORMATIONAND LIAISON        .

1982 Accomplishments

     In 1982, the Agency  obligated  a total  of 534,300  for  this  program,  all' of
which was  under  the  Salaries  and  Expenses appropriation.   This  activity,  which
supports research programs across  all media,  was  consolidated  into  the  Intermedia
program in 1983.  Thus,  the Program Description, 1984 Program Request, 1983 Program,
and 1982 Accompli shments narrative sections  appear there.
                                         A-38

-------
MONITOP.IHGSYSTEMS AND QUALITY ASSURANCE

1984 Program Request

     In 1984,  the Agency  requests  a total  of 5882,900  and  5.3  permanent  work-
years for this program, of which $545,500 is for Salaries and Expenses and $338,400
is for  Research  and  Deve'looment.  This  reflects decreases of $118,900 and 5701,300
respectively, due to the transfer of funding for exploratory research to the Inter-
media program and a  reduced emphasis on measuring population exposure to unregulated
pollutant emissions.   Measurements   of  population  exposures  will  instead  focus
largely on carbon monoxide,   the  mobile source pollutant of priority  concern  for
exposure analysis.

     Assess the Health Risks and  Exposure to Carbon Monoxide to Suoport Review and
Revisidri W N^°  support the  JJAATJ5for
CO, analyses a no*  reports based on  the  human"exposure data  bases  collected  in  the
Washington, D.C.  and  Denver  studies  will  be completed.   The  existing  NAAQS is
designed to assure  that  995  of the population  has  blood  levels  below 2.5% carbox-
yhemoglobin-, and  the  data  from  these  urban-scale  studies will  be  evaluated to
assess the proportion  of  the  population below this level  for  various  candidate
NAAQS values.  An evaluation will  be completed  of the validity of existing activity
pattern exposure models for predicting frequency distributions of human CO exposure
profiles in actual  urban  settings.   The methodology for  the Denver and Washington,
D.C.  field studies  will  be  evaluated for its  applicability to  other criteria  air
pollutants for which NAAQS must be reviewed and revised.

     Assess the  Health Risks  __and  Exposure to Unregulated Mobile Pollutants.  The
results fromthe  field sUnlies will  be evaluated for their applicabi 1 ity to unregu-
lated mobile source air pollutants,  including organi'cs and respirable particulates.
The activity pattern data  base obtained  in  these  two urban-scale  studies  will be
evaluated for potential  use  with human  activity  pattern exposure  models that may
be applicable to unregulated emissions from mobile sources.. Testing and evaluation
will be  undertaken  of  personal  monitoring  techniques  for polynuclear  aromatic
(PNA) hydrocarbon compounds.

     Collect  ami _Maintain Oata in  Support of the FueJ,_and^Fuel Additive Program.
The regTstration'  of fuel's an'cl Fuel  aHdlfT'ves	pTo"gTalTf7'~as'l~mandate(J  ByEongresT,
wil1 be maintained.

     Provide  •Quality  Assurance  Support for Mobile  Source  Program Requirements.
The quaTTtyassTTran^e  program will  support  the  State  i~fT3Local  Air  Moni tori rig
System (SLAMS).   The  nationwide  audit  program  will  obtain,   test,  verify,  and
distribute carefully  specified quality  assurance  samples.   The  quality  assurance
and standards  laboratory  will function  in  assisting State  and  local  agencies in
generating precise  and  accurate  air  monitoring  data  used to  judge  compliance
with the HAAQS.

1983 Program

     In 1983,  the  Agency  is  allocating a  total  of  $1,704,100  and  7.0  permanent
workyears for this  program,  of which 3664,400 is  under  the  Salaries and Expenses
appropriation and  $1,039,700   is  for extramural  purposes  under  the  Research  and
Development appropriation.

     Assess the Health Risks  arid ^^Exposure to Carbon Monoid deto Support Review and
Revision '''0?TiAAcj?  ajd Ifotoi^TtehTcTe^i/ork i s befng coridueted
on field studies  in  Denver,  Colorado,  and Washington, OTC., to develop an accurate
methodology for  measuring  CO  exposure  profiles  of  a   representative  statistical
sample of the  population  of  an  urban  area.   Field sampling  of 1000  persons in.
Washington, D.C.  and  500 person days in  Denver using the  new  computerized hybrid
CO personal  monitors   is  being completed  during  the 1982-1983  winter months in
both cities.    Interpretive analyses  of the  field  data are  being  undertaken to
evaluate the accuracy  and representativeness  of  existing  air monitoring networks
in the region.
                                         A-39

-------
     Assess the Health  Risks and Exposure to UnregulatedMobile Source Pollutants.
The methodology in  the  Denver  and Washington, D.C.populationexposure  studies Is
being evaluated  for use with  unregulated  mobile source pollutants,  including  or-
ganics and respirable particles.  The activity pattern data  base  obtained in these
two field surveys is being analyzed for use with exposure models.

     Collect  and  Maintain Data  in Support of the rue!  and Fuel  Additive Program.
The registration' of  fuels  arid  ?ueT"addi tives program, as mandated  by Congress, i's
being maintained.

     Provide  Quality  Assurance  Support for Mobile Sources  Program Requirements.
The quality assurance  program  supports the  State  and Local Air  Monitoring  System
(SLAMS).  The nationwide audit program obtains, verifies, and distributes carefully
specified quality assurance  samples.   Quality assurance  audits  are  being conducted
on the CO exposure field .studies in Denver and Washington,  D.C.

J983 Explanatjon of Changes from Budget Estimate

     There are no changes from the Budget Estimate.

1982 Accomplishments

     In 1982,  the  Agency  obligated a  total  of 51,277,000  for  this program,  of
which S704.800 was  under  the Salaries  and Expenses  appropriation  and 5572,200 was
for extramural purposes under the Research and Development appropriation.

     Assess the Health  Risks and Exposure to Carbon Monoxide to Support Review and
Revi si on of  NAAQS  and  Motor Vehicl e Emi ssi on Standards"!   Exposure  studies  of CO
were undertake'n compafTh'gthe  level s  people come  into  contact with  during  their
daily lives with actual  readings at fixed air monitoring  stations.   These studies
indicated that actual human exposures to  CO differ from readings at fixed stations,
primarily because people  often conduct activities  which  bring them  very  close to
the sources of these pollutants.

     A report was  completed describing CO  exposures in selected  locations  during
the winter months  in four  cities  (Los Angeles,  CA; Phoenix,   AZ;  Denver, CO;  and
Stamford, CT.l.  A  report also  was completed on  the use  of CO  personal  monitors
to sample commercial settings  in  several  California towns  and  cities.  A prototype
"hybrid" personal   exposure  monitor  was  developed  that  combines  a microproce$sor
computer data  logger with   a  CO  electrochemical   sensing  cell   in  one  package.

     Assess the  Health Risks and Exposure to Unregulated Mobile Source Pollutants.
An evaluation was  uodeftakerrto determine if  the  laboratory measurement technique
used to measure PNA hydrocarbon compounds in  the workplace setting could be applied
to ambient  conditions.   The methodology  was  found to  b.e  a more  cost-effective,
efficient approach  that could  be  used  by  commercial  laboratories  and may  have
potential applicability to personal  monitoring.

     Col 1ect and  Maintai n Data in  Support of the FueJ and Fuel Addi tivesProgram.
The program to 'register  fueTsah4"T'Uei::''Wd'at'i:iWs,'''Ia"sl(ia'ndat₯
-------
HEALTH EFFECTS

1984 Program Request

     The Agency requests  a  total  of 5822,000 and  3.7  permanent workyears for this
program, of which 5565,300 is for  Salaries  and Expenses  and  $256,700  is  for Research
and Development.  This reflects a  decrease  of  5251,100 and SI, 295, 300  respectively,
which result  from  the completion of  studies  both  on  the carcinogenic  risk from
diesel emissions and  on  the  toxic effects  of fuels  and  fuel  additives, and  from a
transfer of exploratory research  funds to the Intermedia program.

     Assess the  Health Risks and Exposure to Carbon Monoxide to Support Review and
Revi sion of 'lAAOS' and Motor VstiicTe''!*-! ssion Standards.  The ' health   research pro~-
grarn for  thi s ' objecti ve nas two  goals":  CT1  to de ve 1 op and  validate techniques to
produce dose-response  data  on  the  toxic effects  of  carbon monoxide;  and  (2) to
produce dose-response data on the toxic effects of carbon monoxide.

     The possibility of  toxic effects  of  exposures  to  CO  concentrations at or  near
the ambient  standard  need  to be more  definitively  determined;  therefore, clinical
and animal studies  to  produce dose-response  data  on the toxic effects of low-level
exposure to  CO  will  be conducted.  Human studies employing  both normal  volunteers
and those with coronary oxygen insufficiencies will  evaluate  the cardiac and respi-
ratory effects  of CO and mixtures  of CO and ozone.  Human studies will  also assess
the validity  of a  method to  relate  ambient  CO levels  to   blood  levels,   Animal
studies will  produce  dose-response   data  on  developmental  and   neurobehavioral
effects of CO exposure.   Techniques  will also be developed to  measure non-invasively
the cardiac  effects of  CD  exposure, and  these techniques will  improve our ability
to produce  dose-response information  data   in  humans.  This information  will be
used in risk assessments,  the  results of  which  will  improve  the  data base  upon
which OAQPS can update the CO standard.

1983 Proaram
     In 1983  the Agency  is  allocating  a  total  of  52,368,400 and  6.1 permanent
workyears to  this  program, of  which $816,400  is  under the  Salaries  and Expenses
appropriation and  SI,552,000  is  for  extramural  purposes  under the  Research and
Development appropriation,

     Assess the Health  Risks and Exposure to Carbon Monoxide to Support  Review and
Revf si on o7  NAAQS  'and'  Motor VeHTc'l e Ernl ssion Standard's"?  Studies  .are being per-
formedto" provide dose-response  dafca on cardiac and  respiratory effects in humans
and neurobehavioral  and developmental  effects in animals following exposure to low
levels of  CO.  In  the  human studies,  both  healthy  volunteers and  patients  with
ischemic heart disease are being studied.  The data from these  studies will contri-
bute to ongoing  risk  assessments which will  refine  the data  base  for updating the
CO standard.

     Assess the Mealth  Risjcs a.ncI Exposurei to Unregulated Mobile Source Pollutants.
Animal  studies are  beihg~CMp]eTed"i:b  evaluate  potential carcinogenicity" of dfesel
emissions.  The level  of  risk  is being  compared  to  that from cigarette  smoke conden-
sate, coke  oven  emissions, and   other  substances known  to  be carcinogenic.   These
studies are being completed in 1983.

     Col 1 ect and  Maintai.n Data  jn  Support of the Fuel and Fuel Additives Program.
C u rr ent studies  i net ucfe  de' vel opmin t and ~~jjrSe"= or b i oa s say  tec hm que s to as se s S- the
mutagenicity of fuels, fuel additives,  and mobile source  emissions.  As a result,
reports describing  these methods and providing protocols  for their  use and inter-
pretation are being completed in 1983.
                                         A-41

-------
1983 Explanation of Changes from Budget Estimate

     The net increase of +51,000,000 results from the following action:

     -Congressional Action.  (+51,000,000)  Congress  added  +$8,526,200 to  the  Re-
sear-en" and  Development  appropriation  for  priority  activities  at the  discretion
of the  Agency.   This  specific  increase   supports  the  Health  Effects  Institute.

1982 Accompl i shments

     In 1982 the Agency obligated a total   of SS.095,400  for  this program,  of which
51,602,800 was under the Salaries and Expenses  appropriation and 53,492,600 was for
extramural  purposes under the Research and Development appropriation.

     Assess the Health Risks and Exposure  to  Carbon Morio.xide to SupportReview and
Revision of MAAQS and Motor Vehicle Eli's si on Standards. Data necessary for improved
estimates of risT"of  exposure  to carbon monoxide w.ere  obtained through controlled
laboratory studies  in human volunteers.   Cardiopulmonary  effects were evaluated in
both normal subjects and those who suffer  from  coronary artery disease when exposed
to levels of CO.  Animal  studies were conducted to ascertain the effects of chronic
CO exposure on  cardiovascular  and  central nervous  system  development in  fetuses
and newborn offspring.

     Assess the  Health Risks and Exposure  to   Unregulated  Mobile Pollutants.  The
carcinogenic potency of particle bound  organics from diesel  exhaust was evaluated.
In addition, the  in vivo  distribution,  metabolism and  carcinogenic   potential  of
ni troaromatics has~oeen studied since these agents appear to account for a signifi-
cant portion of the mutagenic activity  observed in  diesel particle :bound  organics.

     Collect and Maintain Data in  Support of the Fuel and  Fuel Additives Program.
The biological  activity pf~Tractibnsof "unregulated organic ewTssions (gaseous and
particle bound  components)  resulting  from combustion  of  a variety  of  fuels  was
evaluated using in vitro bioassays.

ENVIRONMENTAL  PROCESSES AND EFFECTS

1984 Program Request

    The Agency  requests  a  total  of $900,800 and  6,2 permanent  workyears  for this
program, of which  3496,900  is  for  Salaries and  Expenses and  $403,900 is  for  Re-
search and Development.   This request represents an increase of S14.300 in Salaries
and Expenses and  a decrease  of 5771,300  in  Research  and  Development.  This  net
reduction reflects  the  completion  of a  portion  of  the  work  conducted  on  diesel
particulates and the  transfer of long-term exploratory research  resources  to the
Intermedia program.

     Assess the Health  RisksandExposuretoJJnrequlated MobileSource Pollutants.
Research 6n characterizing thef  gaseous  and parti cu'l ateemissions 'from 'in—use light
and heavy-duty  diesel  and  gasoline  powered trucks and  buses  will be  completed.
Research will  be conducted to determine the carbon monoxide  emissions  from vehicles
operating under  low  ambient  temperature  conditions  in localized  areas.   Also,
emissions from vehicles operating at low speeds and vehicles equipped  with advanced
diesel  emissions control  devices will  be characterized.

     The information from these  studies will be used  to update a comprehensive in-
use emissions  inventory  data base and to support the Agency's mobile source regula-
tory concern for the implications of in-use  motor vehicle emissions on  the  pre-tnanu-
facturing certification program.
                                         A-42

-------
T983 Program

     In 1983,  the  Agency  1s  allocating a  total  of  $1,657,800 and  6.2  permanent
workyears for  this  program,  of whicn  5482,600  is under the  Salaries aad Expenses
appropriation  and  51,175,200   is  for  extramural  purposes   under  the  Research  and
Development appropriation.

     Assess the Health  Risks andExposuretoUnregulated Mobile Source Pollutants.
Research" c'haVrac""t"e~rT;:es the gaseous '.and particulate emissions from in-use "diesel and
gasoline powered trucks and buses.  The volatile organic compound emissions charac-
terization program  for  aldehydes and  hydrocarbon  compounds is being  completed on
consumer-owned, gasoline  powered  vehicles.   The  data  represent a  realistic  basis
for improving  the  models  utilized  in determining  the effects  of  mobile  source
pollutants.  Also, the  emissions  of vehicles operating  under  low speed conditions
and those having advanced diesel emissions control devices  are being characterized.

19?3 Explanationof Changes from Budget Estimate

     The net increase of +3350,000 results from the following action:

     -C on g re Sj i on a 1^_Ac t ion.  (+3350,000)  Congress added +58,526,200 to  the Research
and De ve 1 o pmeij t n a ppir dp r i at i o n   for  priority activities  at  the discretion  of the
Agency.  This  specific  increase  supports  the  development of  measurement methods
for unregulated pollutants from gas and diesel  engines.

1 9S2 Accompli shments

     In 1982,  the  Agency  obligated a total  of  51,757,200  for  this  program,  of
which S791,700 was under  the  Salaries  and Expenses  appropriation  and 5965,500 was
for extramural  purposes under the Research and Development  appropriation.

     Assess the Health Risks and Exposure tci  Unregulated Mobile Source Pollutants.
Dynamometer experimental'  test  procedures were  deveTbped to enable  researchers to
characterize emissions  under  simulated  in-use  driving conditions,  thus  improving
vehicle emissions model  data bases.  Emissions  from  gasoline  fueled passenger cars
were characterized  for  volatile  organic  compounds  (VOCs),   fnclu.ding aldehydes,
using these test procedures.   A major  study on unregulated pollutants,  gas phase
toxins, and catalyst  synthesized  gases was completed  and  the  information provided
to the program offices  for use in determining the need  for  regulatory action.  An
emissions characterization program  was initiated  to study  the  gaseous and partic-
ulate emissions  from   in-use  heavy-duty  diesel   and   gasoline  powered trucks  and
buses.
                                         A-43

-------
                                         AIR

                                 Gases and Particles


ACTUAL
1982
BUDGET
ESTIMATE
1983
CURRENT ESTIMATE INCREASE +
ESTIMATE 1984 DECREASE -
1983 1984 VS 1983
(DOLLARS IN THOUSANDS)
PROGRAM
Scientific
Salaries
Research
Technical
Liaison
Sal aries
Research
Assessment
& Expenses
& Development
TOTAL
Information &
& Expenses
& Development
TOTAL
$468.
$388.
.$857.
$366.
$30.
$397.
6
7
3
1
9
0
$368.
$250.
$618.
$270.
S220.
$490.
3
0
3
3
0
3
$576.0 $536.6 -S39.4
$250.0 $500.0 $250.0
$826.0 $1,036.6 $210.6

Monitoring Systems &
Qua! ity Assurance
 Salaries & Expenses
 Research & Development
                       TOTAL
$3,922.6   $3,354.4   $3,354.4
$4,298.8   $3,015.0   $3,115.0
$8,221.4   $6,369.4   $6,469.4
                               $4,054.6   $4,993.9   54,993.9
                               $4,015.3   $2,990.1   $3,240.1
                               $8,069.9   $7,984..0   $8,234.0
                                                                $3,376.9     $22.5
                                                                $2,472.7   -S642.3
                                                                $5,849.6   -$619.8
                                 $3,734,8 -$1,259.1
                                 $4,159.1    $919.0
                                 $7,893.9   -$340.1
•Health Effects
 Salaries & Expenses
 Research & Development
                       TOTAL

Environmental  Engineering
i Technology
 Salaries & Expenses
 Research & Development
                       TOTAL

Environmental  Processes
& Effects
 Salaries & Expenses
 Research & Development
                       TOTAL

TOTAL:
 Salaries & Expenses
 Research & Development

Gases and Particles    TOTAL  $28,067.4  $23,255.,3  $31,907.1  $26,436.4 -$5,470.7
$199.
$530.
$729.
$2,708.
$7,084.
19,792.
$11,719.
$16,348.
2
2
4
3
1
4
4
,0

$2
$5
$7
$11
$11

,560.
,233.
,793.
,547.
,708.

2
1
3
1
2
si,
S3,
55,
$2,
$8,
sii,
$13,
$18,
803
282
085
808
483
291
536
370
.7
,2
.9
.2
.6
.8
.2
• 9
$1
S2
$2
$6
$9
$11
$14
,473.
$900.
,373.
,509.
,773.
,282.
,631.
,805,
4
3
7
3
3
6
0
4
-$330.3
-$2,381.9
-$2,712.2
-$298.9
-$1,710.3
-$2,009.2
-$1,905,2
-S3.565.5
PERMANENT W.QRKYEARS
Scientific Assessment

Technical Information &
Liaison

Monitoring Systems &
Qua!ity Assurance
     8.,3

     5.1


    64.9
                                               4.5

                                              _2.7


                                              54.9
 8.5
5 4.-9
 7,5
54.9
-1.0
                                      A-44

-------
                                         AIR

                                 Gases and Particles

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       19S3             1984 VS 1983
Health Effects

Environmental Engineering
% Technology

Environmental Processes
& Effects

TOTAL PERMANENT WORKYEARS
(DOLLARS IN THOUSANDS)

   51.6       54.9        54.9        54.9

    3.8                  18.7        15.2      -3.5
   37.8
  171.5
 32.5
149.5
 3.2.5
169,5
 30.5
163.0
-2.0
-6.5
TOTAL WORKYEARS
Scientific Assessment

Technical Information A
Liaison

Monitoring Systems &
Quality Assurance

Health Effects

Environmental Engineering
& Technology

Environmental Processes
& Effects

TOTAL WORKYEARS
12.3
7.5
73.0
56.0
6.0
7.0
4.2
64.1
65.5

11,0

54.1
65.1
30.6
10.0

64.1
65.5
25,3
-1.0


.4
-5.3
   46.6       46.3       50.9       40.5     -10.4
  201.4      187.1      221.7      205.4     -16.3
                                      A-45

-------
                                         AIR
                                 Gases  and Particles
' Major Outputs/Hilestones

 Develop and Validate Air Quality Models.

 -  Development of an evaluated,  docu-
    mented, computer code and users
    guide for an interim regional
    particulate model. (Env.  Processes)

    Development of new air quality
    dispersion parameters for elevated
    releases.  (Env. Processes)

 -  Receptor modeling results and data
    base for comparison with  dispersion
    modeling results for Philadelphia.
    (Env, Processes)

 -  Improved urban and mesoscale  aerosol
    model delivered to UNAMAP.  (Env.
    Processes)

 -  Evaluated moderately complex  terrain
    dispersion model for .stable plume
    impaction.  (Env. Processes)

 Develop Health-and Welfare Effects
 Information.

 -  Publication on the response of an
    atmospheric corrosion monitor as a
    proxy for damage to materials.
    (Env. Processes)

    Evaluation report on dispersion
    models and air quality data for
    assessment of crop yield  impacts of
    air pollutants.  (Env. Processes)

    Provide journal articles:  physio-
    logical, itimunological and bio-
    chemical responses of normal  sub-
    jects exposed to gases and
    particles. (Health)

 -  Provide journal articles:  response
    of asthmatics to $02 exposure.
    (Health)

 -  Publication of criteria document for
    SOX/PM.  (Scientific Assessment)

 -  Publication of criteria document  for
    lead,   (Scientific Assessment)
Actual
 1982
Current
Estimate   Estimate
  1983       1934
  9/85
 8/84
 9/84
 8/85
    9/S5
   8/84
   9/84
   8/85
                 10/85
 9/85
8/34
9/84
8/35
            10/85
 9/84
 4/84
 2/84
 3/84
   9/84





   4/84






   2/84



   3/84


  12/84
9/84
4/84
2/84
3/84
                            6/84
                                         A-46

-------
                                        AIR


                                Gases and Particles


                                                                Current
                                                Actual         Estimate   Estimate
Major .Qutputs/M1_lestone_s_                        JL9J§£L           1983__      1984

Develop and Validate GAP Measurement and
Monitoring Methods.

   Analyze filters and summarize data
   from IP Network.  (Monitoring)                6/82             6/83      6/84

-  Review and process reference and
   equivalent methods applications,
   (Monitoring)                                  9/82             9/83      9/84

-  Apply Airborne Lidar to plume participate
   transport.  (Monitoring)                      9/82             5/83      9/84

Provide QA Support for the GAP Program
Requirements,

-  Provide QA for IP, SLAMS/MAMS ambient
   monitoring networks and for continuous        9/82        •     9/83      9/84
   emission and other source monitors.
   (Monitoring)

Research and Assess Emissions Reduction
Technologies..

-  Determine inhalable particulate                3/83
   emission factors for five major indus-
   trial groups and for paved/unpaved
   roads and combustion sources. (Env.
   Technology)

-  Report on prospective costs of  integrated                     12/83
   air pollutants emissions reduction
 .  options for power utilities.  (Env. Technology)

-  Issue design report for first generation     12/84            12/84     12/84
   two-stage electrostatic precipitators.
   (Env. Technology)

-  Issue report on field evaluation of first                                8/84
   generation full-scale utility spray dryer
   FGD system. (Env. Technology)

-  Complete two-stage ESP  field  pilot  '"                          10/83
   evaluations with transfer of  results
   to users for subsequent implementation.
   (Env. Technology)

-  Issue assessment of fugitive  emissions                         9/83
   particle control methods for  Agency
   guides to States for PSD/SIP's.
   (Env. Technology)
                                        A-47

-------
                                        AIR


                                Gases and Particles
Sudget Request
     The Agency requests a  total  of $25,436,400 and 153.0 permanent  workyears  for
1984, a decrease of 35,470,700 and  6.5 permanent  workyears  from 1983.  Included in
this total is 511,631,000 for Salaries and Expense and  514,905,400 for Research  and
Development, with a decrease  of  $1,905,200  and S3, 565, 500,  respectively .   This  de-
crease occurs primarily  in  the environmental  engineering and  technology  and envi-
ronmental  processes program elements.  In addition, the decrease reflects the trans-
fer of  32,656,600  in  exploratory  research   funds  to  the  Intermedia   program.

Program Description

     The Gases and Particles  (GAP)  research .and development  program provides regu-
latory decision-makers,  the  regulated  community  and  enforcement  officials   in
Regional,  State  and  local  offices with  the   scientifically  credible  data  bases,
methodologies, relationships, models  and  assessments,  and emission reduction tech-
nologies that  they  require to  regulate  atmospheric particle  matter  (PM)  and  its
major components, lead,  and gaseous  sulfur dioxide  (S0|) under the  Clean  Air  Act
as amended  in  1977  (the  Act).   The  following  objectives   support  these  goals:
     Objective 1.   Develop and Val idate  Ai' r  .tj_,__
ti on , Mai ntenance ,  ' and  Enforcement of tW'Wtt'blhTr^inbTearTrrTJuFlTty"' Stahdara's
TRCTiySj.  Research uhder'this'objective' provides  the  air quality models, emissions"
data , monitoring tools,  and technical  support  needed by  States  to  develop, adoot
and enforce cost-effective- control  strategies  required by the Act.  The results of
this work are disseminated for use in State Implementation Plans (SIPs), Prevention
of Significant Deterioration (PSD) determinations, and for protection from visibil-
ity degradation in Class I pristine areas.

     Objective 2.  Develop Health and Welfare Effects Information to Support Review
and Revision of HATSJ5T  A criteria document for health and welfare effects provides
'the p r i.ma ry docume n €1 ti o n  of  scientific data  for  use  in  the review  of  existing
ambient air quality standards.  The entire process Of updating a criteria document,
and proposing and finalizing changes to the existing  standard, is done at five-year
intervals as specified in Sections 108 and JQ9 of the Act.

     Objective 3.   Develop and Validate Measurement  and Monitoring Methods in Su£~
port of the (ia"ges~anci    ti c₯s   aT 'vyoginuW'&'is'''.   Fn "order  to determine
                               _
air quality  trends,'  compliance,  and  enforcement  actions,   new  and  improved  air
pollution methodologies and monitoring  techniques  are being developed and evaluated.
Ambient, source, and exposure measurement methods  are needed for criteria pollutants
and important  related pollutants.   In particular, the  anticipated  size  resolved
participate standard  (for particulate matter less then 10 micron, or PM^Q) requires
continued methods development and .evaluation efforts.

     Objective 4:     Research and Assess Emission Reduction Technologies to Support
                                   Ths .'.effort disseminates to  the  regulating and
regulated communities" data ...... on the performance, cost and reliability of existing, new
and emerging emissions reduction technologies.  This information helps to establish
New Source  Performance  Standards  (NSPS) and  is used  for SIPSi PSD determinations,
and for  the protection  from  visibility  degradation  in Class  I pristine  a'reas.

     Objective 5.   Provide Quality Assurance  Support  for the liases and  Particles
(GAP] Program Requ^remejiTsT  This  i s a  Ton g- term,  c'bnti nui Kg  task  fn  support  oT
TvtTe""4TOT Part 58 , "whi ch spec i f i es mandatory quality assurance for State and  local
air monitoring stations.
                                       A-48

-------
SCIENT IF 1C ASSESSMENT

1984 Program Request

     The Agency requests a total  of 31,036,600 and 7,5 permanent workyears for this
program, of which $536,600 is for Salaries and Expenses  and 5500,000 is for Research
and Development.  This  reflects  a net  increase  of 5210,600  to  provide  additional
contractual support for the  intensive  final  stages of  the development of the Lead
Criteria Document.
     Devel op Heal th and Wei f .^^.A.ttSSH.^l."^--^- 1- °-n- ^° Support Rev 1 ew and Revision
ofNASOJ.  rhe rev'isTori1 W -'thne"'TeaWTr ff erfa ...... llocuaeht will oe~completed on schedufe
during" 1984.   This document  serves  as  the  scientific  data base  upon  which  the
ambient air quality standard  rests, and  the  standard  is  scheduled for review under
the Clean Air Act's mandatory 5-year review cycle.

1983 ........ Program

     In 1983,  the   Agency  is  allocating a  total   of $826,000  and 3.5  permanent
workyears to  this  program, of  which  $576,000 is  under  the Salaries  and Expenses
appropriation and"  $250,000  is  for  extramural  purposes  under  the  Research  and
Development appropriation.

     Develop Heal th and Welfare Effects Information to Support Review and Revision
of HAATST.  TKe  first  external  review  Waft oT the  revised criteria  document  for
1 ead i Vschedul ed for  release  to the public  for comment in March 1983.  In addition,
technical support  is  being provided to  assist  the Office  of  Air Quality Planning
and Standards  (OAQPS)  in the  regulatory  proposal  development  in conjunction  with
the final release of a revised S0x/particulate matter Criteria Document.

1933 Explanation of Changes from Budget Estimate

     The net increase of +5207,700 results from the following action:

     -Reprograinmi ngs .   (+$207,700)  During  the development  of the  operating  plan
several reprogrammings  were  made to this activity  which are  not reoortable under
the Congressional  reprogramming  "limitations.   These  changes  resulted  in  a  net
increase of +207,700 to the Salaries and Expenses .appropriation.

1982 Accoraol ishments
     In 1982, the  Agency  obligated a total  of $857,300 for this  program  of which
$463,600 was  under the Salaries  and Expenses  appropriation  and  5388,700  was  for
extramural purposes under the Research and Development appropriation.

     Develop Health and Welfare Effects Information to Support and Review and Revi-
sion of H/.A§5^  Preparation  of  i  Science  Advisory   Board rs"A§TrevTewe3  final
draft of  lie™ criteria document  for SO^  and  particulate matter  was accomplished.
Technical support  was  provided to  assist  OAQPS in the regulatory  proposal  develop^
ment of the  revised  SOX and .PM  standards.  In addition,  the. update of the  criteria
document for lead was  initiated in March  1982.

TECHNICAL INFORMATION AND LIAISON

1982 Accomplishments                                                          .  •

     In 1982, the  Agency  obligated a total of $397,000  for this program,  of which
$366,100 was  under the Salaries   and  Expenses appropriation  and  530,900   was  for
extramural purposes under the Research  and Development appropriation.  This activ-
ity, which supports  research  programs  across  all media, was consolidated  into the
Intermedia program  in  1983,   Thus,  the  Program Description,  1984 Program Reque st,
1983 Program, and  1982 Accomplishments narrative sections appear there.
                                        A-49

-------
HON IJORIHG SYSTEMS .AND QUAL ITY ASSURANCE

19.34 Program Request

     The Agency  requests  a total  of  S5, 849, 600 and  5^.9 permanent  worky.ear-s  for
this program,  of  which 53,376,900 is  for  Salaries and Expenses  and  $2,472,700 is
for Research and Developraent.  This reflects  an increase  of $22,50.0 and a decrease
of 3642,300  respectively.   The  net decrease  of 5619,800  results  from  the planned
transfer of  operational  responsibilities for  the  Inhalable Particle  (IP)  network
to the  States  and  the  transfer  of  long-term  exploratory  research  resources
to the Intermedia program.

     Develop and Val idate Measurement and Monitoring Methods In Support of the  GAP
Program RequireiTients.  Althougn we are transferring' operational responsibilities to
"the' "State's  i n~ 1983 ,  the  Agency  will  perform  the  analysis  of mass and  chemical
composition  from 7000  filters  collected  annually by the  IP  Network.   Study of the
operating characteristics of the new 10-micron  samplers will be completed.  Glass-
fiber filters  from  the National,  State  and Local  Air Monitoring  Stations (SLAMS/
MftMS) will be  analyzed for mass and trace metals.  Reference and equivalent methods
for GAP pollutants  will  be evaluated.  Continuous emission  monitoring  methods  for
stationary sources  will  be evaluated.   Data support  will  be  provided  for inter-
national monitoring  programs.    Regional  plume  transport  will   be   studied  using
airborne lidar.

     Provide   Quality  Assurance Suppgrt for the GAP   pji^teq^JIrej^ents.  Qua! i ty
                               '"'""""
assurance (QA) support wi I i  oe
Network, and other air monitoring efforts.  A standards laboratory and a repository
of QA naterials  will  be  maintained for use on  request by universities, companies,
agencies, and all other organizations making air measurements.  Routine and special
audits will be conducted on laboratories making ambient and source measurements and
on compressed gas vendors.  The  QA Guidelines,  Handbook, Data Handling System, and
Precision and Accuracy Reporting System will  be maintained  and  updated.   An audit
program for continuous emission monitors for stationary sources will be carried out.
Statistical techniques  for  investigating  spatial  and  temporal   distributions  of
pollutants and corresponding human exposures will be investigated.

1983 Program

     In 1983,  the  Agency  is  allocating a  total  of $6,469,400  and  54.9 permanent
workyears for this program,  of  which  33,354,400  is for  Salaries  and Expenses and
53,115,000 is for extramural research under the Research  and Development appropria-
tion.  The primary focus  is the IP network which  supports the  review and possible
revision of the  existing  particulate  matter standard.   Additionally, the need for
improved monitoring accuracy  is  being emphasized through the quality assurance and
systems development work.
     Develop and_ v^ljjjate Measurement and Monitoring Methods In Support of the  GAP
P r-og ram Requ iTelnen't's .  The" "ISO-station  IP Network is being operated and 37 stations
upgraded with  the  new 10-micron samplers.  This  IP  Network  will  be transferred to
the States  by  the  end of 1983.  Mass and  chemical  composition is being determined
for samples  collected periodically  from 130 sites;  over 7,000  filters  per year.
Monitoring  systems  for  pollutants   in   ambient  air  and in  source  emissions  are
being developed and improved.   Selected systems are subjected to single and  multi-
laboratory  evaluation to identify and correct sources of  errors.

     Provide Quality  Assurance  Support  for the GAP program  Requirements.   Quality
controTsamples are obtained and used in audits.  The system~for  receiving , analyz*
ing and  reporting precision  and  accuracy is  being developed.   Technical  support
is being  provided  to  State  and local  agencies  required to  implement the quality
assurance requirements for air monitoring contained  in 40 CFR  58.  Workshops,  train-
ing programs,  and  performance audits are provided.
                                        A-50

-------
1983 Explanation of Changes
     The net increase of -r$VQQ,OOQ results from the following action:

     -Cpngre;SsiOR.aJ  Actijpn .   (+5100,000)  Congress added +58,526,200 to the Research
and Oeve't o'pWerTt^ a'ppr 'bprili ''t i on  for  priority  activities  at  the  discretion  .of  the
Agency,,  This specific  increase  supports  the  Agency's quality assurance initiative
in relation to the data audit system.

1982 Accompl ishraents

     In 1982, the Agency obligated a total of 58,221,400 for this program, of which
33,922,600 was for Salaries  and Expenses and 34,298,300 was for extramural purposes
under the Research and Development appropriation.

     Develop and Val idate Measurement and Monitoring Methods in Support of the  GAP
Program ^Requi'rements .  "fen stations  in the IP  Network  were fitted i ~wTth the hew in-
mi cron samplers 'at  the  request of the  Agency's Office of  Air  Quality Planning  and
Standards (OAQPS).  Methods  for  continuously monitoring  selected emissions sources
were evaluated  in  response  to  the  requests of  enforcement officials  for testing
compliance with  standards.    Chemical   analyses   of  trace  metals and  statistical
analyses of trends  were performed as a means  of determining the effect  of Agency
actions on national air quality.  A  system  for receiving, analyzing, and reporting
the precision and accuracy of all air monitoring data was developed.

     Provide  Quality Assurance  Support for the GAP Program Requirements.  Quality
Assurance (QA)  procedures,  including  performance audits  51 SLAMS/NAMb'  stations,
maintenance of a repository  of reference  samples and standards,  publication of new
and revised .QA guidelines, and  the Agency Mandatory QA Program, continued in response
to Regional, State, and local  needs.

HEALTH EFFECTS

1984 Program Request

     The Agency  requests  a  total  of 57, 893, 900  and 54.9  permanent  workye-ars  for
this program,  of  which S3, 734, 800 is  for Salaries  and  Expenses  and 54,159,100 is
for extramural  Research and  Development  activities.  This  reflects  a  decrease of
SI, 259, 100 in  Salaries  and  Expenses  and  an  increase of 5919,000 in Research and
Development which is primarily due to  an  accounting  change.  Formerly, many of the
on-site research  support  contracts  were  funded out  of  the Salaries  and Expenses
appropriation.  This transfer  will  allow the  Agency to  fund the contracts  from  a
more appropriate source, the Research and Development appropriation.

     Develop Health and Welfare Effects Information   to Support Review and Revision
of HAAQS^.  TKe  research progranr~nas three  ma"jor 'goals:   1) to ""provide  data  on  a
fill 1 range  of health effects  of  exposure to  gases,  SOj,  particles,  and lead  from
human .and  animal  studies, £)  to provide better  models  to extrapolate animal  data
to humans,  and 3) to develop  improved test methods for uss  by the Environmental
Protection Agency (EPA) and .others to conduct improved research into the physiologic
response of humans to gaseous  air pollutants and  pirticles":

     Because  of  the  evidence regarding the  potential for health damage from parti-
cles, the Agency  is  considering a  size-resolved particle  standard  in  lieu  of the
current one  for Total   Suspended  Particulars  (TSP).   Much of  the  health  effects
work in  1984 is  designed to  refine  and  improve  the data which supports a size-
resolved particle  standard.   Fine-mode particles, mostly in the 1-2  urn range,  will
be studied  in  normal  and susceptible human and. animal populations.    In response to
program office  priorities,  additional   clinical  studies  of  normal  and susceptible
populations will  be  conducted; the effects of, acute and chronic exposure to large
inhalable particles  (.10-15  urn) will  be more  closely examined  and  both human and
animal dose-response  studies  will   devote   special   attention  to determining  the
deposition, clearance,  and pulmonary effects of  particles,  alone  and  in combination
with ozone, H02, and SOg-
                                        A-51

-------
     The neurological   consequences  of  high  lead  body  burdens  are  well   known.
Epideraiological  evidence  links   severe  developmental  disorders,  such  as   mental
retardation, speech and language difficulties, and  cognitive  and perceptual  learn-
ing disabilities,  with lead body burdens previously  considered  to  be  low to  moder»-
ate.  Since the developing  nervous  system is  known  to be :nore vulnerable to  lead
toxicity than the  mature system,  it  is necessary  to  obtain quantitative data  on the
neurological effects  of  lead  at lower  levels,  especially  at levels  previously
considered to be safe in children.   Volunteers from  age six to adult with lead  body'
burdens considered to be low to  moderate  will  be  studied  using electroohysiological
assessments to  several  behavioral  and  central  nervous  system  responses.   The
significance of the effects noted will then be evaluated for use  in assessing  health
risks from lead at these levels.

     Animal test  data  is  critical  in setting  and   revising  standards  to  protect
human health under the Clean Air Act.  Present bioassay and extrapolation techniques
are expensive and  time-consuming and  do  not  always  provide  reliable,  quantitative
correlation between animal and predictive human  effects,  or  accurate extrapolation
from high to low dose.  In 1984, work will provide  faster, more reliable models to
predict human pulmonary  and  morphological  responses  to  gas   and  particle  exposure
based on data gathered in animal  experiments.  Research will also  provide data on
biochemical, pulmonary, and  cardiovascular disease  and  impairment in  susceptible
populations following SOg exposure.

1983 Program

     In 1933, the  Agency is  allocating  a total  of $8,234,000  and  54.9 permanent
workyears to this  program,  of which 34,993,900 is under the  Salaries  and Expenses
appropriation and   33,240,100  is  for  extramural  purposes  under  the   Research  and
Development appropriation.

     Develop Health and Welfare  Effects  Information  to Support Review and  Revision
of MAAQS.AniiiiaTtoxicology  studTes™wiTlSesc'rTlse  effects of  chnJnTcexpos"ure""to'
coarse and  fine-mode   particles   on  lung   structure  and  function and  host  defense
mechanisms in rodents.  The major accomplishment expected  from  human  dose response
studies in 1983 will  be  a report on acute  physiological  responses on normal  people
in inhalation of  gases, particles,  and mixtures  of  both.  A  workshop  will  be held
in 1983 to  develop a  long term  research  strategy for  extrapolation  modeling.   New
software is  being prepared  and  installed  in the  physiological data  acquisition
system computer which will enable scientists to collect more data, display different
systems, and collect and analyze data simultaneously.

19831 Explanation of^Changes from Budget Estimate

     The net increase  of +$250,000 results from the  following action:

     -Congressional Action.  (+3250,000)   Congress added +38,526,200 to  the Research
and Oev'eTbpie'rvE appropriation  for  priority   activities  at  the discretion   of the
Agency.  This specific increase supports epidemiology  studies  conducted by other
agencies.

1982 Accompli shments

     In 1982, the Agency obligated a total  of $8,069,900 for this program, of which
$4,054,600 was for Salaries and Expenses  and 34,015,300 was for extramural purposes
under the Research and Development appropriation.

     Develop  Health and Welfare Effects  Information to Support Review and Revision
of NAlQSTMajor  accomplishments" included tiie dfscbvery	tfiat	puTSonafy•""Tn'ficffotiT
caused or  exacerbated  by  particle  inhalation, may result  in  lung fibrosis  and the
development of an  extrapolation  model  using lung branchings  to determine particle
deposition  in the lungs of different animal species  and humans.
                                       A-52

-------
EHV I RONHENTAL EHG I MEER I KG AND TECHNOLOGY

19S4 Program Request

     The Agency  requests  a total  of  32,373,700 and  15.2 permanent  workyears  for
this program, of which 51,473,400  is  for Salaries  and Expenses and 5900,300 is  for
Research and Development, with a decrease of 5330,300 and 52,381,9.00, respectively.
This decrease results  from  completion  of technology development tests on two-stage
electrostatic precipitators  (ESP's),   reductions   in  fundamental /appl ied  research
on two-stage  ESP's  and   electrostatically   enhanced  fabric'  filters  (ESFF),  and
decreased need  for  wet  flue  gas  desulfurization  (FGD)  research  .due to  the  con-
mercial status  of the technology.  These  reductions  reflect  EPA's  reduced involve-
ment in  the development  of control  technologies, a  function  "lore  appropriately
handled by the private sector,  and  a desire  to focus on assessing those technologies
needed to support the  regulatory mandates.   Also,  resources  for long-term explora-
tory research are transferred to the Intermedia program,
     Research and AsseJg...§SlsslMs Reduction Technologies to Support P'ermitting and
C ornp 1 Ta n c e ! Ac "t'i "v"i ti e s .  Tn  order  For  the  Agency  and  the  regulated  community to
fully implement  the  regulatory agenda  for gases  and  particles, low  cost,  highly
reliable emission reduction  technology  design  and performance  criteria  need to be
disseminated to the user and permitting communities.  These needs will be addressed
by the following research activities,

     Fundamentals of combined  SOX and particle  emissions  capture by new (two-staq.e
ESP's, spray  dryers,  and  E.SFF  baghouses)  and  conventional   technology  will  b.e
evaluated.  Emphasis will be  on  assessing  the  potential  for dry sorbents  as means
to capture SOX.

     The potential  for  optimizing   the  combination  of  air   pollution  reduction
technologies for coal-fired power plants will be assessed  and will include the bene-
ficial role  of  coal  cleaning  to  increase  plant  reliability  as well  as*a   supple-
mental method to  other technologies for  complying with  SOX emission regulations.
An effort  to assess -the impacts  resulting  from different  compositions  of  coal
on power  plant  operation  and emission   reduction  potential   will   be  initiated.

     The ninth  FGD  Symposium and Fifth  Particle Collection .Symposia  will  be held
jointly with appropriate  institutions  as a primary  vehicle  to  transfer the latest
technology in these areas.  Workshops in SOX and particle emissions reduction techr
nology will be  held  periodically  to assist the Regions,  local  and State personnel
in their permitting determinations.   An  effort  to  assist  Regions and States on the
selection of mean.s  of reducing  fugitive emissions  will  begin, and  operation and
maintenance guides for fabric  filter baghouses  issued.

1983 Program

     In 1983, the Agency  is  allocating a total  of 55,085,900 and  18.7  permanent work-
years to this program, of which 51,803,700 is under the  Salaries  and Expenses appro-
priation and $3,282,200 is  for extramural  purposes under the Research .and Develop-
ment appropriation.  This  work was  formerly  contained  in  the  GAP-Energy program,

     Research and Assess Emissions R^                        Support Pemittinq aad
C ompn ance Actl Wife's". ~ Researcif ''arT'lSi furtdamerfEal mecHanvsms ....... appl i cable  to ..... two-
"stage ESP's  and  enhanced  fabric  filters (ESFF)  is conducted  as a means to  provide
the scientific/ engineering underpinnings of these new  particle  collection technol-
ogies and  ease their  transition  and  acceptance  by  the  regulating  and regulated
communities.  The engineering  pilot  testing of  the  two-stage  ESP  system will con-
clude as will  pilot  tests of full  sized bags using  the ESFF principle  in a  reverse
air mode (the mode used by electric utilities).

     Fabric filter  baghouses  are  being  accepted  as  an  option  for  utility and
certain industrial particle  emissions  reduction applications and are known  to have
potential for SOX reductions.  Therefore,  our evaluations of conventional baghouses
for particle control  will  be completed and data made available  to support the  1985
                                       .A-53

-------
flSPS review for  utility  boilers,  .along with  field assessments of  the  performance
of baghouses in  conjunction with  spray dryers  for  combined  S0x-Qsrticle  capture
;o ascertain reliability  anci tinie  in compliance of this technology.

     A state-of-the-art  FGD  technology assessment  for  fossil  fuel  fired  boilers
will be completed for the 1985  NSPS review and for regional  and enforcement aermit-
ting purposes.   Evaluations of two methods  for  fugitive  particles emissions  reduc-
tion will  be completed and a technology assessment made.  . Operation  and  maintenance
guides for electrostatic  precipi tators will be  completed  and  will include  flue gas
conditioning methods as  stop-gap techniques to  improve existing  ESP performance in
low sulfur coal  applications.

1983 Explanation of Changes from Budget Estimate

     The net increase of  +£5,085,900 results from the following action:

     -Restructuring.  [ +$5,085,900-)   The   Congressional ly  approved  restructuring
el -1 mi n a ted tRe  Gases and' Particles,  and  Oxidants -  Energy  program elements and
moved them  into  Air program  elements.   This  allows  for  better  management and
accountability of resources  because both  Energy  and  Air have the  same  regulatory
program effort and the end products  are  air regulations.   The change to the Salaries
and Expenses  appropriation was +S1,803.,700 and  the  change  to  the  Research and
Development appropriation was +$3,282,200.

1982 Accomplishments

     In 1982, the Agency  obligated a total of  5729,400  for this program  of which
5199,200 was under  the  Salaries  and  Expenses  appropriation  and  5530,200 was for
extramural purposes under the Research and Development appropriation,

     Research  and Assess  Emissions Reduction  Technologies to .Support  Pernrittinq
and Compliance Activities,  in  1932  t'rjis   program  operated  in   concert with ETie"
Oxitiants and Hazardous Air Pollutant industrial emissions control  and characteriza-
tion programs and  thereafter  was   consolidated  into  the  Oxidants program  in  1983,
During the year  determinations  of  inhalable  particle  emissions   factors  were made
for iron  and  steel, cement  and  lime,  non-ferrous  metals,  pulp   and  paper,  ferro-
alloys, paved and  unpaved roads,   and.combustion  sources  to provide the  Agency  a
base to formulate guidelines to States in developing their SIPs.

EHVIRQKMENTAl PROCESSES AND EFFECTS

1984 ProgramRequest

     The Agency  requests  a total   of  $9,282,600  and  30.5 permanent  workyears for
this program, of  which 52,509,300 is  for Salaries and  Expenses  and  $6,773,300 is
for Research and Development.  This reflects a  decrease of $298,900 and 51,710,300,
respectively..  This  is  a result  of  the   transfer  of  long-term  exploratory re-
search resources to  the  Intermedia program;  a  reduced level  of  effort associated
with the  development of  a  regional  scale  participate  matter  air  quality  model
(resulting in no  delay  in  regulatory applications);  and the completion  of  field
research on the  effects  of gases  and  particles on crop  loss  in  the  National Crop
Loss Assessment  Network   (NCLAN)  and the  transfer of  most  of  the  remaining re-
sources associated  with  the .MCLAM  effort  to the Oxidants research  program.  A pro-
ject will   be initiated  to  determine  the  sources that  contribute  to  visibility
degradation in the Great  Smokies,  the largest pristine area in the  East.

     Develop  Air Qua!ity  Models to  Support   Implementation, Maintenance,  and En-
forcementof NAAQinRe sea r c n  wiTl  focus  on   the  developmentand"validation  of
improved atmospheric  dispersion parameters in  air quality  models,  the development
and validation  of  S02 air quality dispersion  models  for use in  complex terrain,
and the development and   validation  of particulate  air  quality  dispersion  models
for use on  urban,  meso-, and regional  scales.   Source apportionment  methods  (SAM)
                                        A-54

-------
will be developed and  used in  combination  with air  quality disoersion models  in
order to  provide  the  best possible  information  to   Regional,  State,  and  local
officials and  industry  for  use  in  developing  the  irsost  cost  affective  control
strategies needed for  the  assessment  of  new sources,  revision of  SIPs,  protection
of visibility  in Class  I  areas,  and   prevention  of  significant  deterioration.

     The ability of current air  quality  models  tc predict  dispersion  fror: el.-evstM
releases has been criticized  because of  a  failure to  account  for changes  in  the
dispersion properties  of  the  atmosphere with height.   Therefore,  in  1984,  proce-
dures for computing dispersion from evaluated sources  will  t>e imoroved.  A project
report will   be  published   recommending  procedures  for  extrapolating  turbulence
properties with height.

     Present air quality  dispersion  models for  sources  in complex   terrain  are
inadequate to meet  the needs of  Regions,   States,  local  governments  and  industry
in the  developing  energy  industries  in the  mountainous  West.    Conclusions  frori
small ridge  and  Fluid  Modeling  Facility  dispersion  studies  will  be  incorporated
into improved near-source  dispersion  models for use  in complex terrain.  A  fullf
scale plume  study  will  take  place  in   less  idealized  terrain  than  the  previous
studies; thus,   it  should prove  to  be a  good  test for any  complex terrain  model
that would evolve from the hill  and ridge experiments.   A project report on interim
conclusions  from the full  scale  plume  study will  be produced in late 1984.  Analysis
of the  study will be completed  in  the following year  with  a  user's guide available
by 1988.

     Improved urban  and  regional   scale  particulate models  are  needed  to  support
anticipated revisions  of SIPs for  particulate matter.   The  newly proposed standard
will discriminate between  fine (<2.S  urn)  and  inhalable (<10  urn)  particles,   future
particulate natter  standard  revisions  may  distinguish between  various  chanical
classifications (e.g.,   sulfates,  nitrates, and  organic/carbonaceous  particles).
Current air  quality models  were  developed  for  total suspended particles (TSP)  and
are incapable  of dealing  with   chemical  transformation  and particle  deposition..
1985 will see publication and evaluation of sulfate  and nitrate  production modules,
and the  transfer to  the  Us.er's  Network  for  Applied  (Modeling  of  Air Pollution
(UNAMAP) of  improved urban and mesoscale aerosol  models.

     Full-scale efforts to develop a  regional scale particulate  matter air quality
model will begin in  JJ384.   The  objective is to  develop models that can  be  used by
EPA in  policy-type  studies to  demonstrate  the  occurrence  of long-range transport
of particles and to  demonstrate  the effectiveness of alternative control strategies
for meeting  acceptable ambient  levels.   Completion  of  these  models  is expected by
the end of 1986.  Tracer experiments in  conjunction  with the National  Qceanqgraohic
and Atmospheric  Administration  and the  Department  of  Energy will  be  conducted to
provide atmospheric   dispersion   data  for   verification of   regional   scale  model
estimates.

     The air quality   and  visibility in  the Great Smokey  Mountains   region  will
be documented  and  the  sources   influencing  the  air  quality  will be  determined.
Periodic pro.gress reports  will  be  produced  on  the results  of the air quality moni-
toring  and  the  analysis   of  the  montoring  data.    Mass  trajectory  computations
will be  compared with  the results  of  receptor modeling  applied to  the chemical
analyses of  particulate  samples  in  order  to   perform source  apportionment.   A
project report will  be prepared by mid-1985.

     Develop Health and Welfare Effects  Information to  Suoport Review and Revision
of UAHJS7  TFie  National  Crop  QTSSAssessment  -Network  TflCtMl  wTTI  utilize ""data
obtained in  field   studies  for  integration of  dose-response functions involving
pollutant mixtures and evaluate  gaseous pollutant  dispersion models  and rural  air
quality data for assessing  the  impacts  of SOg,  03, and MOg  mixtures  on the growth
and yield of agronomic crops.   This will allow for an  economic  assessment of crop
impact  to be accomplished in the future.
                                       A-55

-------
     Studies .on materials damage  will  continue  which are needed  to  niake  reliable,
defensible estimates  of  the cost  of  air  pollution  in terms  of  dollars  spent  to
replace damaged  materials   or  goods  or  to  .accelerate  naintenance  schedules  for
exposed materials.  Field studies  to determine the corrosion  rates of common exterior
materials as a function of  air pollution levels  will  be implemented.   These studies
will  employ the atmospheric corrosion  monitor currently under development, and the
aata base ~.ney generate will refine estimates of the materials daraage causes nation-
wide by air pollution and the cost associated with this damage.

1983 Program

     In 1983, the  Agency is allocating a  total  of 311,291,800 and  32,5  permanent
workyears to this  program,  of  which  52,308.200  is under the  Salaries  and Expenses
appropriation and  38,483,600  is  for   extramural  purposes   under  the  Research  and
Development appropriation.
     Develop  3n.d Val ^da^ Ai'r  Qual Ity  _Mode1 s to .Support  IniDlementation, Mainte-
nance , and £nTy cement '"oT'Ti/fttjS^  rnTnTTgnrHowTe^g^or^Ke'''?^^'^^ ..... oT'turbUl eric'e
vs. height  is  being  examined ,  and  improved  procedures  for  treating  dispersion
parameters front  elevated  sources are  being developed.   These  procedures  will  be
introduced into  new  or existing  air  quality models  and the revised  models,  with
appropriate users'  guides, will  be  introduced into UHAHAP.   An  updated  version of
UNAMAP (version 5)  will be available late in 1983.

     work in  the complex  terrain  modeling  area,  formerly   funded  in  the  Energy
program, emphasizes  development  of  improved  dispersion models  on three  scales:
local (0-50 km), mesoscale  (up to 300 km), and  regional.  The  Green  River Ambient
Model Assessment  study  attempts  to   develop  an  air  quality   model  for  use  in
analyzing the  environmental  impacts  of  energy  development  in  a mesoscale  region
of highly  complex  terrain.  This modeling effort  focuses  on  the completion,  by
April 1983, of  a site-specific  mespscale  Lagrangian  air quality model  for use in
evaluating PSD permit applications in western Colorado and eastern Utah.

     Current efforts in urban  parti cul ate  modeling concentrate  on  the development
and evaluation of transport, .dispersion, chemical transformation, aerosol dynamics,
optical  effects, and removal modules  for use in  a  comprehensive urban parti cul ate
rap del .  Current  research  in  regional  particulate  model  development  continues to
improve understanding  of  the  meteorological   conditions that  lead to  prolonged,
elevated pollutant episodes.

     DeveJ op Heal th and Mel fare Effects , Infprnrati'on  to ' Supip^prt Review_ and Revision
of liASDin  The I983~Crop Loss ATsessment )JetworTTTb^us?r^n"th₯~Tnipac"ts" of pol UTtant
mixtures (SOj and S02/ozone, S02/N02  combinations)  on the yield of major agronomic
crops.  The  current program   completes  field  research   initiated  in  prior years
which shows  pollutant  mixtures  to  affect  crop  response differently  from single
pol lutants.

     Research on  materials  damage  is  concentrating  on the   development  of  an
atmospheric corrosion monitor.   This  monitor  will be  used in future  field studies
to determine  the increment  in  corrosion rate  of common  exterior  metals resulting
from exposures  to  sulfur dioxide and  particles.   An  integrated  damage  model  is
being exercised  with regional  air pollution data a.nd  improved damage  functions for
a variety of exposed  materials  to produce a refined national  assessment of materials
damage and associated costs.

1983 Explanation of Changes from  Budaet Estimate
------- : ----- ------------ ' ------------------------------ I' - ~ ------------- "."." ------- ~ ---- ------------------ -------- ' -------- ~-T -• — ' : --------- a -T --------------- :u.i-

     The net  increase of +53,498,500 results from the  following actions:

     -Restructuring.  (+$3,483,500)   The  Congressional 1y   approved   restructuring
el iminated tfie  Eases and  Particles,   and  Oxidants - Energy program  elements and
moved them  into  the  Air program elements.   This allows  for better management and
accountability of  resources  because both  Energy and  Air have  the  same  regulatory
                                       A-56

-------
program effort and the end  products  are  air  regulations.   The  change to the Salar-
ies and  Expenses  appropriation was  +3233,000  and  the  change  to the  Research and
Development appropriation was +33,250,500.

     -Reprogrammings.  (+515,000)  During  the  development  of  the  operating  plan,
several reprogramimngs were  made to this  activity  which are  not  reoortable  uncle*"
the Congressional   reprogramming limitations.   These  changes   resulted  in  
-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                     ENVIRONMENTAL PROTECTION AGENCY

                           1984 Sudget Estimate

                            Table of Contents
                                                                           Paoe
ABATEMENT ,5 CONTROL
   Air Quality & Stationary Source Planning & Standards — ............     A- 5.9
      Emission Standards & Technology Assessment .............. , .......     A-62
      Pollutant Strategies & Air Standards Development. ............. .....     A-63
      State Program Guidelines & Regulations Development ..............     A-64
   Mobile Source Air Pollution Control & Fuel Economy. ...... ..... .....     A-66
      Emission Standards, Technical Assessment X Characterization..,..     A-68
      Testing, Technical & Administrative Support .....................     A-7Q
      Emissions & Fuel  Economy Compliance. ...'.. ............ ............     A-71
      Mobile .Source Standards & Guidelines ....... . ............. , .......     A-72
   State Programs Resource Assistance .............. ........... ........     A-73
      Control Agency Resource Supplementation (105 Grants) ---- » .......     A-74
      Training. .... .......................................... « ..... ...     A-76
   Air Quality Management Implementation ...... ........................     A-78
   Trends Monitoring & Progress Assessment., ..................... .....     A-82
      Ambient Air Quality Monitoring .......... ......... , ...... , .......     A-83
      Air Quality & Emissions Data Analysis S Progress Assessment .....     A-84
                                   A-58

-------
                                         AIR

                 Air Quality 3 Stationary Source  Planning  &  Standards

PROGRAM
Emission Standards &
Technology Assessment
Salaries & Expenses
Abatement Control &
Compl i ance
TOTAL
Pollutant Strategies S
Air Standards
Development
Salaries & Expenses
Abatement Control S
Compliance
TOTAL
State Program
Guidelines &
Regulations Development
Salaries & Expenses
Abatement Control &
Compliance
TOTAL
TOTAL:
Salaries & Expenses
Abatement Control &
ACTUAL
1982
(DOLLARS


$4,183.5
$10,320.4

$14,503.9



$2,080.0
$1,134,9

$3,214.9



$3,739.2
$1,367.7

$S,106.;9

$10,002.7
$12,823,0
BUDGET
ESTIMATE
1983
CURRENT
ESTIMATE
1983
ESTIMATE INCREASE *
1984 DECREASE -
1984 VS 1983
IN THOUSANDS)


53,550.4
$9,693,2

$13,243.6



$1,991.6
$1,128.4

53,120.0



$2,465,8
$960. 0

$3,425,3

$8,007.8
$11,781.6


$3,550.4
$9,693.2

$13,243.6



$2,274.6
$1,128.4

$3,403.0



$2,465.8
$960.0

$3,425.8

$8,290.8
$11,781,6


$3,848,2
$8,793.2

$12,641.4



$2,316.7
$1,593.0

$3,909.7



$2,626.2
$1,235.0

$3,861.2

$8,791.1
$11,621.2


$297.8
-5900.0

-S602.2



$42.1
$464.6

$506.7



S160.4
$275.0

$435.4

$500.3
-$160.4
 Compliance

Air Quality &          TOTAL  522,825.7  519,789.4  $20,072.4  $20,412.3     $339.9
Stationary Source
Planning & Standards


PERMANENT WORK YEARS
Emission Standards S               94.5       87.8       87.3       84.8       -2.5
Technology Assessment

Pollutant Strategies &             44.4       39.8       47,8       47,8
Air Standards
Development

State Program                      88.0       64.3       63.9       60.3       -3.6
Guidelines &
Regulations Development

TOTAL PERMANENT WORKYEARS         226.9      191,9      199.0      192.9       -6.1
                                     A-59

-------
                                         AIR

                 Air Quality & Stationary Source  Planning  &  Standards

                                ACTUAL   BUDGET      CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984     DECREASE  -
                                           1983        1983             1984 VS  1983

                                (DOLLARS IN THOUSANDS)
TOTAL WORKYEARS
Emission Standards &
Technology Assessment

Pollutant Strategies A
Air Standards
Development

State Program
Guidelines &
Regulations Development

TOTAL WORKYEARS
100.2       93.6       93..1        90,6       -2.5
 51..6       44,4       52.4       54.4
2.0
 95.5       68.3       67.9       63.9       -4.0
247.3      206.3      213.4      208,9       -4.5
                                      A-60

-------
                                           AIR


                 A1r Quality and Stationary Source Planning and Standards
Budget Request
     The Agency requests a  total  of $20,412,300 and 192.9 permanent  workyears  for
1984, an increase of 5339,900 and a decrease of 6.1 permanent  workyears  from 1983.
Included in this total  is $8,791,100 for  Salaries  and  Expenses and  $11,621,200  for
Abatement, Control, and Compliance, which  represents an  increase  of 5500,300 and a
decrease of  5160,400,  respectively.  The  intramural   increase reflects  increased
payroll and operating costs primarily  associated with  the transfer of Public Health
Service employee costs  to  EPA  in  1984.  The  decrease primarily  reflects  a  fewer
number of NSPS  in  resource  intensive  development  phases  in Emissions  Standards  and
Technology Assessment program,

Program. Description

     The activities under  this  program are:   establishment  of emission  standards
for stationary  sources;  review  and  revision  of  ambient air quality  standards;
pollutant assessments;  development of  pollutant control  analytical  tools  and guide-
lines; translation of  control  strategies  into regulatory actions;   and  assessment
of the energy Implications  of regulatory actions.

     Emiss1o n S tandards and Techno1 ogy Assessmenit —  National   emission   standards
for stationary  sources  are 'Tet  uhde"r  section  TT1  and  112 of the  Clean Air  Act.
Section 111 mandates the  Environmental  Protection  Agency  to  establish New Source
Performance Standards (NSPS).   Section  112 authorizes  National Emission  Standards
for Hazardous Air Pollutants (NESHAP).

     New Source Performance  Standards  reflect the performance of the  best  control
systems for reducing  emissions, considering  cost  and energy  impact  for  specific
processes or  facilities.   The  analysis  supporting the  NSPS  considers  technical
feasibility, cost, and economic,  energy and environmental  Impacts.   The  background
Information published as part of the  NSPS setting  process provides  useful  data to
State agencies  in  defining  best available  control technology,  lowest  achievable
emission rates, and reasonably  available  control  technology,   when  such  determina-
tions must be made under other sections of the Clean Air Act.

     National  Emission Standards for  Hazardous Air Pollutants  regulations develop-
ment provides comprehensive national surveys of well controlled sources,  evaluation
and verification of test methods and identification of  design  and operation  factors
which affect  the  release  of  air pollutants.   It  also  provides  indepth  technical
analysis to support decisions  which limit the  release  of hazardous  pollutants  1n
the air.

     Pol 1 utant Strategies and Atr Standards Development — The major  activities  of
this programelement are:(l) review  and revision, as  appropriate,  of all  existing
National Ambient Air Quality  Standards  as  mandated  by  the Clean Air Act;  (2) Iden-
tification and  assessment  of  potential  hazardous  air  pollutants,   including  the
determination as  to  the  appropriateness  of  their listing  under  Section   112  of
the Clean Air Act; and,  (3)  analytic  support  to  Agency  regulatory efforts  to. set
emission standards for pollutants regulated under Sections lll(d)  and 112.

     State Program Guidelines and Regulations Development --  The objectives  of this
program element are the development of guidelines  and  regulations  that  set forth
requirements for air  pollution   control programs  implemented  by  the  States  under
the Clean  Air Act  (principally  State  Implementation Plans   (SIPs));  development
of technical guidance  for modeling; emission inventory development and air quality
standard attainment demonstrations; and maintaining an overview of the development
                                         A-61

-------
and implementation of air pollution control  programs  to assure national  consistency
at the regional,  State, and local  levels.   The  State  Implementation Plans  (SIPs)
provide for the  attainment and maintenance  of  National Ambient Air Quality  Stan-
dards, and establishment of  programs  for the prevention of  significant deteriora-
tion (PSD) of  air  quality  in clean areas, and for the  protection  of  visibility  in
national  parks and wilderness areas,

EMISSIONSTANDARDSAND TECHNOLOGY ASSESSMENT

1984 Program Request

     The Agency  requests  a total of  $12,641,400  and 84.8  permanent workyears  for
this program,  of  which $3,848,200 is  for  Salaries  and Expenses and $8,793,200  is
for Abatement,  Control,  and Compliance,   This   is  an  increase  of  $297,800  and
a decrease of  $900,000, respectively.   Although  there is a decrease  of 2.5  per-
manent workyears, the  increase  in  Salaries and Expenses reflects  higher  personnel
costs.  The  reduction  in  contract expenditures reflects a  transfer of  support  to
other program  areas  to  strengthen  regulatory Impact  and data  analysis  required  in
NSPS and NESHAP  promulgation.   Efforts  will  continue on NSPS  projects  as mandated
by the Clean  Air Act.  Twelve  proposals (include three proposals  as  a result  of
litigations and reviews of  standards  completed  in 1982 and  1983)  and  18 promulga-
tions covering 15 additional source  categories  are  planned.    Reviews will be  com-
pleted for six existing NSPS.   In  addition, six NESHAP  proposals and  three  pro-
mulgations are also scheduled for 1984.

1983 Program

     In 1983,  the Agency  is allocating  a  total  of  $13,243,600  and 87.3  permanent
workyears to  this  program,  of which  $3,550,400  is   for  Salaries and Expenses  and
$9,693,200 is  for  Abatement, Control,  and  Compliance.  Efforts are continuing  to
complete the  Clean  Air Act  mandated  NSPS.   Twenty-six  NSPS  proposals  (21   new
standards; 5 revisions) and 19 promulgations (12  new  standards; 7 revisions)  cover-
ing 12 new source categories are scheduled for 1983.  In addition,  nine reviews  of
existing standards are to be completed  and  Control Technique Guidelines (CTGs)  for
six sources  of volatile  organic compounds  and  one  for the  sources for nitrogen
dioxide will  be published.   Four NESHAP  covering  benzene sources are  scheduled for
promulgation and two proposals  are  anticipated  (coke oven by  products-benzene  and
coke ovens-charging and topside  leaks).   In addition,  the  asbestos revision  is  to
be proposed and reviews for beryllium and mercury are to be completed.

1983 Explanation of Changes	from_ Budget Estimate

     There is no change to this program.

1982 Accomplishments

     In 1982, the Agency obligated  $14,503,900 for this  program, of which $4,183,500
was for Salaries  and Expenses and $10,320,400  for Abatement,  Control and Compliance.
The contract  resources were  used to  continue  work  related  to  setting NSPS  and
NESHAP.  Work  continued on  setting performance  standards   for  all  listed  source
categories.  Twelve source categories,  however, were deleted from  the list because
their growth was projected to be insignificant.

     NSPS activity included:  proposal of one new standard and six revisions;  pro-
mulgation of three new  standards and  one revision; and completion  of three reviews
of existing  standards.  Three  control technique  guidelines  (nonmetallic  minerals,
plywood manufacturing, and stationary  sources  of particulate matter)  were prepared
and CTGs  for  four volatile  organic  compounds sources  were  drafted and  published
for public comment.   Work  continued toward  promulgation  of  four NESHAP benzene
standards, proposal   of a  fifth  benzene NESHAP,'  and proposal, of  NESHAP for  coke
ovens - charging and topside leaks.
                                        A-62

-------
 POLLUTANT STRATEGIES AMD AIR STANDARDS  DEVELOPMENT

 1984 Program Request

      The Agency requests  a  total  of $3,909,700  and 47.8  permanent workyears  for
 this program,  of  which  $2,316,700  is  for  Salaries and  Expenses,  and  $1,593,000
 is for  Abatement,  Control  and  Compliance.  This  is  an  increase  of 542,100  and
• $464,600, respectively,  and  reflects  increased  payroll  costs  and  increased  ex-
 tramural support for additional  regulatory  impact analysis.   Revisions to particu-
 late matter  (PM), nitrogen dioxide  (N02),  and  sulfur dioxide (S02) standards will
 be promulgated.  For  the upcoming  ozone  (03)   revision,  risk  assessment  will  be
 applied and  regulatory  impact analysis  will  be  developed.   Hazardous  pollutants
 regulatory decisions will be made for  nine  compounds evaluated  in  1983.  Also, in
 1984, the Science Advisory Board will  complete  review of six additional potential
 air toxic pollutants.

 1983 Program

      In 1983,  the Agency is allocating  a  total  of  $3,403,000  and 47.8 permanent
 workyears to this program,  of which $2,274,600  is  for Salaries  and  Expenses  and
 $1,128,400 is for Abatement, Control,  and  Compliance.   Reviews  of  the hydrocarbon
 standard and the carbon monoxide  (CO) standard  have  been completed  and changes will
 be promulgated in 1983.   Revisions  to the particulate matter,  nitrogen dioxide,
 and sulfur  dioxide  standards  are  being  proposed,  and  staff  work  on  the lead
 and ozone NAAQS  is  in process.   Application  of a  risk assessment methodology on
 standards is planned  in  1983.  Pollutant  assessment activities are  to  result in
 the development of  regulatory strategy  for 12  pollutants:   coke  oven  emissions;
 acrylonitrile; perchloroethylene;  .trichloroethylene;  methyl   chloroform; methylene
 chloride; Freon 113;  carbon tetrachloride; toluene;  nickel; vinylldene chloride;
 and manganese.  Work will continue  on  six  other pollutants.   In addition, a  final
 determination will be  made concerning the regulation of cadmium.
                                                                        s
 1983 Explanation of^Changes from  Budget Estimate

      The net increase  of +$283,000  results  from the  following action:

      -Congressional  Action.  (+$283.000)   This  increase  includes  +$283,000  of  the
 $10.5 million Salaries and Expenses  add-on  which  supports  the 480  additional  perma-
 nent full-time workyears provided to the Agency.

 1982 Accomplisnments

      In 1982, the Agency  obligated $3,214,900 for this  program  of  which  $2,080,000
 was for Salaries and  Expenses and $1*134,900 was for Abatement, Control, and Com-
 pliance.  Contract  funds  provided support  for  evaluation  of  NAAQS, analysis of
 the environmental,  economic, and  regulatory  impacts  of the  possible   standards
 revision, and development of an  Improved risk  assessment methodology.

      Work was underway to analyze comments  and to promulgate a  decision  concerning
 the hydrocarbon standard  1n early 1983.   In  addition, work  was  also underway to
 promulgate revisions to  the  carbon  monoxide standards and to  propose appropriate
 changes to the  nitrogen  oxides,  sulfur  oxides,  and particulate matter  standards.
 In the  pollutant  assessment area,  detailed  health  and  source  assessments were
 underway for 12 pollutants.  Other activities  included work  on a preliminary  deter-
 mination for the listing decision of cadmium,  with  a final  decision to be published
 in 1983; the completion of population  exposure estimates  for 43 chemicals; and  the
 completion of a source study on  arsenic.
                                          A-63

-------
STATE PROGRAM JUJDEUNES. AND REGULATjQMS JEVEL.QPMENT

1984Program Request

     The Agency  requests  a total  of $3,861,200 and  60.3  permanent workyears  for
this program,  of which $2,626,200 1s  for  Salaries and Expenses and $1,235,000  is
for Abatement,  Control,  and  Compliance.   This  is an  increase  of  $166,400  and
$275,000, respectively.  Although  there is  a  decrease of  3.6  permanent  workyears,
the increase  In  Salaries  and Expenses  reflects higher  personnel  costs.  The  In-
crease of  $275,000  in  Abatement,  Control  and  Compliance  is  necessary  to  fund
development of technical  information  on toxic  pollutants that will be required  by
the State  and local  government   control  programs.  The Agency  will  maintain  its
management and overview of  the'  SIP process.  Assistance  will  be  provided to  States
in New Source  Review (NSR)  and  Prevention  of Significant  Deterioration  (PSD)  pro-
grams development.   Program guidance  and policy papers will be  provided for these
and other  standards  implementation.   Procedures will  be implemented for oversight
of State  programs.   Emission  factors  and  related  information  on  toxic  chemicals
will be developed  and  Issued.  Technical assistance and  guidance on data bases and
modeling techniques for cities not  attaining 1n  1982 will  be provided, and a revised
version of EPA's  Air Quality  Modeling Guideline will  be Issued.   If the operating
permit program is  proposed  in 1983,  it will  result in promulgation in  1984.   Also,
guidance will  be  provided  to  Regional offices  and  the modeling  clearinghouse  will
continue to promote and ensure Regional consistency.

1983Program

     In 1983,  the Agency  is  allocating  a  total  of $3,425,800  and 63.9 permanent
workyears to  this program,  of which  $2,465,800 is for  Salaries and Expenses  and
$960,000 is  for  Abatement,  Control,  and Compliance.   Contract funds are  being used
to support continuation of the Best Available Control  Technology and Lowest Achiev-
able Emission  Rate  (BACT/LAER)   Clearinghouse,  development  of  emission  factors
modeling evaluations,  and  to  refine  guidance  for  revised partlculate  matter  and
$02 standards*   National  management  and oversight of major  SIP programs is  con-
tinuing to ensure  that  backlogs  do not reoccur.  Emphasis  1s  being placed on pro-
gram guidance  for SIP  revisions  for implementing  revised ambient standards,  in-
cluding technical  guidance  for  revision  of Partlculate Plans and preparation  of
guidance for  revision  of M02, S02, and  lead  SIPs.   Guidance is also being provided
for areas with a  December  1982 attainment deadline (for existing ambient standards),
as well as guidance  for areas with deficient 1979  SIPs.   Policy clarification and
guidance is being provided on  03  control strategies, and the BACT/LAER Clearinghouse
is being maintained.   Regulations  for PM  and SOg are  being proposed and inventory
guidance issued.   Efforts   to  develop alternative  approaches  to  regulations  are
continuing and the  operating  permit program will  be proposed 1f  current investi-
gative efforts  prove the program  to  be  beneficial.  The  multi-year  program  for
evaluation and validation of air quality models and development of  emission factors
for SIP revisions is being continued,

1983 Explanatlon of Changes from Budget Estimate

     There 1s no  change to this program.

1982 Accompl1shments

     In 1982, the Agency obligated $5,106,900 for this program, of  which  53,739,200
was for Salaries and Expenses  and $1,367,700 was for Abatement, Control,  and CortpH-
ance.  Contract  efforts  supported SIP development  and modeling.  The emphasis  1n
1982 continued to  be national  management  and evaluation of all  major  SIP programs
which were initiated in previous years.   Policy guidance  and technical  assistance
were continued for the 00/03 areas that had been granted attainment date  extensions
to 1987.
                                         A-64

-------
     Policy and guidance to expedite  SIP  processing  was developed and published as
Agency policy.   As  a  result  of  the  improved  processing  techniques,  the  Agency
achieved substantial success  in eliminating the  SIP backlog  in  1982.   Management
of the NSR  and PSD programs continued  with major efforts  to  encourage  additional
States to take over the permitting program and to  audit State  implementation.  The
Best Available  Control  Technology and  Lowest Achievable  Emission Rate  Clearing-
house was expanded  and  updated.   Technical  assistance was  furnished  to  States  and
Regional  offices  in  the development  and  adoption  of emission  regulations  for  the
control of  VOC.   Stack height  regulations  were  proposed and promulgated.   Addi-
tional modeling guidance was disseminated and emission factors  updated for criteria
pollutants.  The  multi-year program  to  evaluate  dispersion model  performance  was
continued with substantial progress completed for  the  initial  two model  categories
(urban and rural) of seven to  be evaluated.
                                         A-€5

-------
                                         AIR

                  Mobile Source Air Pollution Control  &  Fuel  Economy

                                ACTUAL   BUDGET     CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983       1983              1984  VS  1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Emission Standards,
Technical Assessment &
Characterization
 Salaries & Expenses
 Abatement Control  4
 Compli ance
Testing, Technical &
Administrative Support
 Salaries & Expenses
 Abatement Control &
 Compliance
Emissions 4 Fuel
Economy Compl iance
 Salaries & Expenses
 Abatement Control &
 C ompl i ance
Mobile Source
Standards & Guidelines
 Abatement Control &
 Compliance
TOTAL:
 Salaries 4 Expenses
 Abatement Control &
 Compl iance

Mobile Source Air
Pollution Control &
Fuel Economy
        $4,099.0   S3,348.6    $3,404.6    $3,188.3   -5216.3
        $1,402.3   $2,080.0    $2,080.0    $2,563.3    $483.3
                       TOTAL   $5,501.3   $5,428.6   $5,484.6    $5,751.6     $267.0
        $3,926.3   $4,201.9   $4,113.4   $4,262.1    $148.7
          $245.0     S958.3     $958.3     $900.0    -$58.3

TOTAL   54,171.3   $5,160.2   $5,071.7   $5,162.1     $90.4
        $1,327.4   $1,430.2   $1,462.7   $1,332.7    -$130.0
           $76.0                            $35.0      $35.0
                       TOTAL   $1,403.4   $1,430.2   $1,462.7   $1,367.7     -$95.0
          $887.7

TOTAL     $887.7
        $9,352.7   $8,980.7   $8,980.7   $8,783.1
        $2,611.0   $3,038.3   $3,038.3   $3,498.3
                             -$197.6
                              $460.0
TOTAL  $11,963.7  $12,019.0  $12,019.0  $12,281.4    $262.4
PERMANENT WORKYEARS
Emission Standards,
Technical Assessment &
Characterization

Testing, Technical &
Administrative Support

Emissions & Fuel
Economy Compliance

TOTAL PERMANENT WORKYEARS
            83.6
            49'. 0
61.9
50.2
61.5
50.1
60.7
50.1
            33.3       28.3       28.1       25.9      -2.2


           165.9      140.4      139.7     . 136.7      -3.0
                                        A-66

-------
                                         AIR

                  Mobile Source Air Pollution Control  & Fuel  Economy

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE     1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)
TOTAL WORK YEARS
Emission Standards,
Technical Assessment &
Characterization

Testing, Technical  &
Administrative Support

Emissions & Fuel
Economy Compliance

TOTAL WORKYEARS
106.7
 76.9
 38.0
75.0
73.9
36.6
74.6
73.8
36.4
71.9      -2.7
75.1
1.3
33.3      -3.1
221.6      185.5
          184.8      180.3      -4.5
                                        A-67

-------
                                        AIR


                Mobile Source A1r Pollution Control  and Fuel  Economy
Budget Request
     The Agency requests a  total  of $12,281,400 and 136,7  permanent  workyears for
1984, an increase of $262,400 and a decrease of  3.0  permanent  workyears  from 1983.
Included in  this  total  is $8,783,100  for  Salaries and  Expenses  and  $3,498,300
for Abatement,  Control  and  Compliance,  with  a decrease  of  $197,600  and  an In-
crease of  $460,000,  respectively.  The  decreases  primarily reflect  completion  of
certain mandatory  rulemaking  actions,  increased  reliance  on manufacturers  fuel
economy calculations,  and  a  more efficient  certification program.  The  increase
in extramural funds  will be used  for in-use vehicle emissions testing and analysis
aimed at determining the amount  of 1n-use emissions and their affect on air quality.

Program Description

     This subactivfty  carries  out  programs  for  the  control  of  mobile  source
emissions as required  by the  Clean  Air Act, and generates information and analyses
related to motor vehicle fuel  economy under the terms of the Motor Vehicle Informa-
tion and Cost Savings Act.

     Emission Standards, Technical Assessment and Characterization -- This  program
includes: 1)fReestablishmentofemission  standardsfor  mobile  sources,  and
associated technical  analyses and  emission characterization;- 2)  the  development
of technical  procedures and  guidelines  applicable  to  the  control  of  emissions
from In-use  vehicles;  3)  the measurement and  assessment  of  1n-use  motor  vehicle
emission levels; and 4)  technical  analyses related  to  the  development  of informa-
tion on motor vehicle fuel  economy.

     Testing. Technical and Administrative Support --  This  program  provides  1n-
house laboratory,  3eTEa  processing,  anHother  support  for  mobile  source  air
pollution control and fuel  economy activities as well as test procedure development
and refinement.

     Emissions and Fuel Economy Compliance —   This  program provides  for the en-
gineering review of  data to  determine  the compliance  of  new motor  vehicles  with
emission standards and other pre-production  control  requirements,  follow-up  review
of the  validity  of  manufacturers'  data,  and associated technical  activities.
Similar procedures for fuel economy determinations are also included.

     Mobile Source Standards and Guidelines —  This program provided for the set-
ting of emission IstandardlT for mobile  sources  and  the  assessment of 1n-use vehicle
emissions.  In 1982, this  program was restructured  and has been distributed  among
the Mobile  Source  Air  Pollution  Control  and  Fuel   Economy  program  elements.

EMISSION STANDARDS. TECHNICAL ASSESSMENT AND CHARACTERIZATION

1984 Program Request

     In 1984, the Agency  requests a total  of $5,751,600  and  60.7  permanent work-
years for  this  program,  of  which  $3,188,300  Is  for Salaries  and Expenses' and
$2,563,300 Is  for  Abatement,  Control  and Compliance.  This  represents  a decrease
of .8 permanent  workyears  and $216,300  and an increase  of 5483,300, respectively
from 1983  and reflects  completion  of  certain mandatory  rulemaking actions and
reduced testing  and  analysis  of fuel  economy  devices.   The  Increase  reflects
efforts aimed at  determining  In-use emissions  of  new  control  technology vehicles
and additional emission characterization work*
                                        A-68

-------
     Final Rulemaklng  for  the Heavy  Duty  Particulate and Heavy  Duty  Engine/Light
Duty Truck nitrogen  oxide  standards  will  be developed.  If necessary,  a  Notice of
Proposed Rulemaking  for  revised Heavy  Duty  hydrocarbon/carbon monoxide  standards
for 1988 and  later model  years will  be published,  and the Light  Duty  Diesel  Par-
ticulate standard  will be  reviewed.   The testing  procedure  for light duty vehicles
will be assessed for potential changes.

     Acquiring emissions data  analyses  of  air quality Impacts  from  new technology
vehicles and  Implementing  a  multi-year strategy  for updating and  improving  the
environmental data  base  on  vehicle  emissions  will   continue.   Testing  of  in-use
vehicles will be increased to determine the emissions effect of new control  techno-
logy and "tamper-proof" systems at high mileage.  We will  also increase our ability
to analyze available data, provide  timely reports,  and  revise  emissions  factors
and  models  used  by  EPA,  industry,  states,  and  Congress.   Characterization   of
emissions from  alternative fuels  will  continue, as  will  coordination  with  the
Office of  Research  and  Development  and  the  Health Effects  Institute  on  mobile
source related  pollution   and  health  Impacts.   Fuel  economy work  will  focus  on
evaluating the  difference  between 1n-use  fuel  economy and  EPA fuel  economy  fig-
ures.  Testing  and  evaluation  of  fuel  economy  retrofit devices  will  continue.

1983^ Program

     In 1983, the  Agency  is  allocating a  total  of  $5,484,600 and  61.5  permanent
workyears for this  program,  of which  $3,404,600  is  for Salaries  and  Expenses  and
52,080,000 1s for  extramural  purposes under  Abatement,   Control  and  Compliance.
The Agency is working  on the  promu-1 gation  of  revised standards for carbon monoxide
and hydrocarbons  from heavy  duty  gasoline engines,  high  altitude  emissions,  and
light duty diesel averaging.

     The Notices of  Proposed  Rulemaklng for Heavy Duty Diesel  Particulates,  Heavy
Duty Engine  nitrogen oxide standards,  and evaluation of the  transient heavy  duty
test procedure  are  scheduled  for  completion.   The Agency is proposing postponement
of the  1985  Implementation of  the Light Duty Diesel Particulate  standard.   Tech-
nical assistance and review  of  State  Implementation  Plans,  particularly as  they
relate to motor  vehicle  emissions,  continues.  Additional work  focuses on  testing
In-use vehicles, including new technology  vehicles.   Characterization of  emissions
from methanol  fueled  vehicles continues.   Evaluation  of  fuel  economy  retrofit
device effectiveness  continues.   The aircraft standards, the  High Altitude  Report
to Congress,   and  the  Railroad  Report  to Congress  will  be  completed  in  1983.

1983 Expl anation of Changes from Budget Estimate

     The net increase of +$56,000 results from the following action:

     -Reprogranmings.  (+$56,000)   During  the development  of  the  operating  plan,
several reprogrammings were  made  to  this  activity  which  are  not  reportable under
the Congressional  reprogr aiming  limitations.   These  changes  resulted  1n  a  net
Increase of +$56,000 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982, the Agency obligated $5,501,300 for this program, of which $4,099,000
was for  Salaries  and Expenses  and  $1,402,300  was  for  Abatement,   Control  and
Compliance.  In  1982,  significant  progress was made on the  Auto  Task  Force  relief
items.  Standards  development  focused on diesel  partlculates  and heavy duty  engine?
emissions.  A revision was made to the warranty  related  short test for light duty
vehicle emissions.   Final  changes to the  aircraft  standards were  underway.   The
High Altitude Report to Congress  and the  Railroad  Report  to Congress were  under
preparation in  1982.   Characterization work  focused on  emission characterization
of alternative fuels, particularly methanol.
                                       A-69

-------
TESTING,TECHNICALAND ADMINISTRATIVESUPPORT

1984 Program Requ est

     The Agency "requests  a total  of $5,162,100 and  50,1  permanent worKyears  for
this program,  of which  $4,262,100 is for  Salaries and  Expenses  and  5900,000  is
for Abatement,  Control  and Compliance.   This  represents  an increase  of  $148,700
and a decrease of 558,300 respectively from 1983.  This reflects increased emphasis
on in-house testing in support of in-use vehicle emissions determinations to improve
our data bases  and to  update them with data  on those vehicle  technologies  which
will dominate the fleet during 1984 and later periods,

     This program will provide basic testing, technical support, and administrative
services for operation  of the Motor  Vehicle Emissions Laboratory  (MVEL).   Admin-
istrative services to be performed include personnel, procurement,  safety, facility
management, and ADP support for the MVEL,

     Testing activities will  include  tests  for  preproduction  certification;  tests
for fuel economy  labeling and compliance  programs;  tests  of in-use  vehicles  for
determination of emissions from  vehicles  in actual use; tests  for  recall  surveil-
lance and confirmatory  purposes;  tests  in support of  tampering  and  fuel  switching
programs, and tests for the 1n-use compliance  feasibility  program.   In addition to
these testing  programs,  engineering evaluations  will  be  conducted on  the  feasi-
bility of using  electric  dynamometers  for better simulation of  vehicle road  load.
The program  to  determine correlation  with  manufacturers  laboratories  will   be
maintained.

1983 Program

     In 1983,  the  Agency is  allocating  a  total  of 55,071,700  and  50.1  permanent
workyears for this program,  of which $4,113,400 1-s  for Salaries and  Expenses  and
$958,300 is for  Abatement,  Control and Compliance.  Testing  and technical  support
activities have been  redirected  to operate  at a level where significant economies
of scale can :be obtained and to consolidate similar testing activities.

     Testing support to the certification and  fuel  economy labeling and compliance
programs continues  (1,000 tests);  other testing  supported at  the Motor  Vehicle
Emissions Laboratory includes: recall, surveillance, and tampering and  fuel switch-
ing programs;  testing  in-use  vehicles  for  development  of  emission  factors;  and
testing for the- initiation of  a  feasibility  study for development of  an  in-use
motor vehicle compliance program.   Approximately 1,300 tests  will be performed  for
these programs in 1983.  Correlation  programs to  maintain equivalent test procedures
between manufacturers and  the EPA  continue.   The  adequacy  of  existing procedures
and equipment  to  test  newer  technology  vehicles  is  being  evaluated.  The  basic
personnel, support  services,  ADP,  and  administrative  management  functions  are
provided for the  MVEL.   Safety and  facility  support  services  are  provided,  aimed
at maintaining a high level of occupational  safety and health.

1983 Expl anation of Changes-t|J*om Budget Estimate

     The net decrease of -$88,500 results from the following action;

     -Reprogrammings.  (-$88,500)   During  the development  of the  operating  plan,
several  reprogrammlngs  were  made to this activity  which are not  reportable  under
the Congressional  reprogramming  limitations.   These  changes  resulted  in  a"  net
decrease of -$88,500 to the Salaries and Expenses appropriation.
                                       A-70

-------
1982 Accomplishments

     In 1982, the Agency obligated $4,171,300 for this program, of which $3,926,300
was for  Salaries and  Expenses  and $245,000  was for  Abatement,  Control  and  Com-
pliance.  The program  focused  an  increasing  efficiency in testing,  and technical
and administrative support while  maintaining  or expanding the quality and quantity
of outputs.  A total  of 1,235 tests were performed for in-use emissions assessment,
certification, and fuel economy.

EMISSIONS AND FUEL ECONOMY COMPLIANCE

1984 jrogram Request

     The Agency  requests  a total  of  $1,367,700 and  25,9  permanent  workyears  for
this program, of  which $1,332,700  is  for Salaries and  Expenses and  535,000  is  for
Abatement, Control and Compliance.  This  represents  a  decrease  of  2.2 permanent
workyears and  $130,000 and  an  increase  of  $35,000  respectively,  from  1983  and
reflects increased  reliance  on  manufacturers  fuel  economy  calculations, a  more
efficient certification  program,   and   a   slight increase  in  resources  for  the
alternative compliance program.

     The emissions certification  program  will  continue to  issue between 300  and
400 certificates  of  compliance.   The  fuel  economy   information  and  compliance
program will generate  information  for  the  Gas MileageGu1de,  calculate general  and
specific fuel economy  labels, and ca 1 cu 1 ate  each nianufactuirer's  Corporate Average
Fu«l Economy (CAFE).   Sampling  of manufacturers label  calculations  will  be  made.
Efforts to  develop  fuel economy  regulations that  provide  more  accurate  consumer
information will  continue  and a rulemaking  will  be completed.   Development  of an
alternative compliance program will continue  and analytical work  will be completed
in 1985.

1983 Program

     In 1983,  the Agency  is allocating  $1,462,700 and 28.1 permanent workyears
for this  program, all  of  which  is   for  Salaries and Expenses.   The Agency  is
continuing to  streamline  the  certification  process  by  revising requirements  to
reduce the burden on  industry without  sacrificing  environmental  results.  Programs
to assess  an in-use  compliance  approach  to emissions control  and to  test  high
mileage in-use  vehicles  to gather  data on  in-use  emissions and  emission control
system deterioration  over  time  are underway.  The  fuel economy  program continues
to generate  1,600 to  1,700 fuel  economy  labels a year,  data for the  Gas Mileage
Guide, and 150  CAFE  calculations.  Increased effort  is being, devoted  to  revising
the fuel economy  program to more  closely  approximate  in-use results, improving the
labeling data base,  and reducing the manufacturers*'  reporting costs.

198 3 Expl ana ti on of Changes f rofn BudgetIs 11 ma te

     The net increase of +$32,500 results from the following action;

     -Reprogrammin^s.  (+$32,500)  During  the  development  of the  operating  plan,
several reprograminngs were  made to this  activity  which are  not reportable  under
the Congressional  reprogramming  limitations.  These  changes  resulted  in  a  net
Increase of +$32,500 to the Salaries and Expenses appropriation.

1982 AccompliShments

     In 1982, the Agency obligated $1,403,400 for this  program, of which $1,327,400
was for  Salaries  and  Expenses  and $76,000 was for extramural projects under the
Abatement, Control and Compliance  ippropriation.  Certificates were  issued for 302
light duty engine families  and  the Fuel Economy program produced 1,700 labels and
performed 150 CAFE calculations.   The  Final   Rulemaking  for changes  to Improve the
certification process was prepared.
                                        A-71

-------
MOBILE SOURCE STANDARDS AND GUIDELINES

19 8 2 Acc prop 1 i s tone nts

     In 1982, the  Agency  obligated  $887,700 for  this  program,  all  of  which was
for extramural projects under the Abatement,  Control  and Compliance appropriation.
These funds were used  to  test vehicles to  determine  their  emissions" in-use.  This
program was restructured  in  1982  and has been  distributed  among the Mobile Source
Air Pollution Control and Fuel Economy program elements.
                                        A-72

-------
                                         AIR

                          State Programs Resource  Assistance

                                ACTUAL   BUDGET      CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983        1983             1984 VS  1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Control Agency Resource
Supplementation
(105 Grants)
 Abatement Control  &
 Compliance
       $88,145.1  $69,954.7  $84,734.9  $69,954.7  -$14,780.2

TOTAL  $88,145.1  $69,954.7  $84,734.9  $69,954,7  -$14,780.2
Training
 Salaries & Expenses
 Abatement Control  &
 Compl iance
          $216.4
          $800.3

TOTAL   $1,016.7
$238.1
$624.0
$238.1
$964.0
                                            $862.1   $1,202.1
$254.7      S16.6
$476.9    -$487.1

$731.6    -$470.5
TOTAL:
 Salaries & Expenses             $216.4     $238.1     $238.1      $254.7       $16,6
 Abatement Control  &          $88,945.4  $70,578.7  $85,698.9   $70,431.6  -$15,267.3
 Compliance                                '

State Programs         TOTAL  $89,161.8  $70,816.8  $85,937.0   $70,686.3  -$15,250.7
Resource Assistance
PERMANENT WORKYEARS


Training

TOTAL PERMANENT WORKYEARS
             4.0

             4.0
   4.0

   4.0
   4.0

   4.0
   4.0

   4.0
TOTAL WORKYEARS


Training

TOTAL WORKYEARS
             4.2

             4.2
   4.0

   4.0
   4.0

   4.0
   4,0

   4.0
                                      A-73

-------
                                         AIR

                          State Programs Resource Assistance

Budget Request

     The Agency  requests  a total of  $70,686,300 and 4.0  permanent workyeafs  for
1984, a decrease  of $15,250,700  from 1983.   Included  in  this  total  is  $254,700
for Salaries and Expenses  and  $70,431,600  for Abatement,  Control,  and Compliance,
an increase of $16,600  and a  decrease of $15,267,300, respectively.  The  increase
reflects higher personnel  costs.  The  decrease reflects  our  projection for  a reduc-
tion in regulatory  planning costs  as the  result  of completion  of several  major
strategies; elimination of certain  monitoring sites; management  efficiencies;  and
increased use of fee systems.

Program Description

     This subactivity provides financial  support to State and local air pollution
control agencies, including Indian  lands,  for the prevention, abatement, and  con-
trol  of air pollution.   Its  prime objective is  to support  the development  and
implementation of effective State and  local  programs for the attainment and  mainte-
nance of the  National  Ambient  Air  Quality Standards  (NAAQS),  in  accordance  with
provisions of the Clean Air Act.

     Direct grants assistance  to control  agencies which  have major roles  for devel-
oping and carrying out  these  programs,  constitutes  the  major form  of EPA  resource
assistance.  Direct grants assistance  is supplemented by the training of State and
local air  pollution  personnel  and  the  provision of  services of contractors  for
specific tasks identified  by the States and localities.  Grants  support  State and
local control agencies  in  carrying  out their  roles  under  the Clean Air Act.  This
includes:   the development of  State  Implementation  Plans  for  the attainment  of
national air  quality  standards;  enforcement  of source  emission regulations  and
requirements; review and permitting of  new sources; and the monitoring of  ambient
air quality.   In  addition, these funds  promote  the assumption and  implementation
of other regulatory responsibilities Including the Prevention of  Significant Deter-
ioration (PSD),  New  Scarce  Performance Standards  (NSPS);   and  National  Emission
Standards for Hazardous Air Pollutants (NESHAPS).

     Control Agency Resource Supplementation (105 Grants)  —  Under the  Clean  Air
Act, the control  of air pollution  at its  source 1s primarily the  responsibility
of State and  local  governments.  States,  in  cooperation  with local agencies,  are
responsible under the Act  for developing  and implementing  programs to  attain and
maintain the national ambient air quality standards.  EPA grant assistance partially
supports the  costs  for the operation  and continued  efforts of these  State  and
local agency programs in meeting these responsibilities.

     Training — Resource  assistance  is further supplemented by  the provision  of
training in  specialized areas  of air pollution  control.   Since July 1, 1976,  the
EPA Air Pollution  Training Institute  at Research  Triangle  Park, North Carolina,
has been operated under contract.  New courses are developed as needed,  instruction
manuals and materials are  revised  and updated, and manuals  and instructional mate-
rials are provided to university  training  centers.   The EPA staff  works with uni-
versity centers to develop State  and  local self-sufficiency in training by offer-
ing courses at area training centers.

CONTR.pj.J\G_ENCY RESOURCE SUPPLEMENTATION (105 GRANTS!

1984 Program Request

     The Agency  requests a total  of  $69,954,700- for Abatement,  Control, and Com-
pliance, a decrease of $14,780,200 from 1983.   Although this reduction  reflects a
17 percent decrease in Federal funds,  it actually represents approximately  a 7 per-
cent decrease in total  resources  for  air pollution control  programs; since States
on the average contribute 60 percent of the total resources.
                                        A-74

-------
     Several factors  operating  collectively  will  permit  this  reduction in  grant
funding without impeding  effective  State  and local  efforts for  the  prevention  and
control of  air pollution.   There  will  be  substantial  reductions  in  regulatory
planning costs now that States have made  considerable  progresss  in the development
of several major  strategies  (e.g.,  post 1982 attainment SIPs; SIPs  for lead (Pb);
Inspection and Maintenance  (I/M)  programs).   Other savings that States  can  choose
to make  include:  the  elimination of  unnecessary  or  duplicate  monitoring  sites;
management efficiencies including the  implementation of procedural  and administra-
tive simplifications  (e.g.,  streamlining  of  SIP  requirements,  consolidation  of
grants administrative  requirements);  and  the increased  use   by  control  agencies
of fee systems for permits required by the Clean  Air  Act.

     With these savings  in place, most other State  and local air  management,  en-
forcement and  monitoring  programs will not  expand  but  will  be  maintained  at  the
1983 levels.   State and local air management programs will  focus  on the commitments
for the development  and  implementation of additional mobile  and  stationary  source
controls that  were Included in the 1982 SIPs  for ozone (03) and/or carbon monoxide
(CO).  Other significant efforts will  include: (1)  continued development and  imple-
mentation of new  or improved regulatory  reform  measures,  particularly the  use  of
emission trading  options, development  of  generic programs  for emissions  trading
and use of  operating permit programs  for  modifying  individual source  control  re-
quirements as  enforceable revisions  to approved  strategies;  (2)  development  by
remaining States  of programs for  the  prevention of significant deterioration;  and,
(3) the assumption of programs  to implement recently  promulgated  New Source Perfor-
mance Standards  and  National  Emission  Standards  for  Hazardous  Air  Pollutants.

     State and local  air  enforcement  efforts are expected to  be  maintained  at the
1983 program  levels.   Programs  will   continue  to  focus  on  the surveillance  and
compliance of  major  sources impacting nonattainment areas,  including  volatile
organic compound  (VOC)  sources  In  attainment areas.   Other  efforts  will  include
the continued  implementation  of  programs  for  the  review and  permitting   of  new
sources and  the   enforcement  of  permit requirements.   The  State  and  local  Air
Monitoring System, (SLAMS)  network will be maintained  and  will  continue to focus
on the  National  Air  Monitoring  System (NAMS)  network including  required  quality
assurance.             ,

     The resources  provided  as  a  result  of the savings  in   regulatory  planning,
monitoring and management programs will allow control agencies in 1984 to undertake
a limited number  of new  or expanded  efforts to  respond to emerging needs and  air
quality problems.  This Includes: the  completion of  appropriate  data bases and the
development of  regulatory  strategies  for  revised  National   Ambient  Air Quality
Standards for  particulate matter  and  sulfur dioxide,  the analysis  of  strategy
alternatives for  major urban extension areas where  strategies indicate attainment
by 1987  is  Impossible or highly  improbable and  enforcement efforts related  to
additional delegations.  Further, the modest assessment effort of  air toxics  pro-
blems will be  increasingly  focused  on populated areas  having  significant chemical,
petroleum, or  solvent Industries and  the employment  of  good science and consistent
techniques In -the performance of the assessments.

1983 Program

     In 1983,  the  Agency  is  allocating a -total of $84,734,900 to this program for
Abatement, Control,  and  Compliance.   State  and  local   air  management  programs  are
focusing on the  commitments Included  in   the post 1982 attainment  strategies  for
ozone and/or carbon  monoxide which are to  be  undertaken or  completed during' the
fiscal year.   Examples Include  State  development of additional  controls  for  sta-
tionary sources  and the  completion  of motor vehicle  inspection  and maintenance
                                         A-75

-------
programs where required programs have not  become  operational.   Other major efforts
include: (1)  development  of programs by  additional  States  for the  prevention  of
significant deterioration (2) delegation  of recently promulgated NSPS  and NESHAP;
(3) continuing development of regulatory  reforms  including use  of emission trading
options and development  of  generic  programs; (4) revision  of control  requirements
for major  sulfur dioxide regulations having significant  fuel  and  energy  impact;
and, (5) the  completion  by  additional  States  of attainment  strategies  for  lead
(Pb).  Additional  States  are  undertaking,  at  their own  initiative,  programs  to
assess air toxics problems and programs.

     State and local air  enforcement programs are focusing  on the surveillance and
compliance of major  sources  impacting nonattalnment  areas,  including major sources
located in  attainment  areas  emitting  volatile  organic   compounds  which  through
transport may contribute  to urban  nonattainment  problems-   Other efforts  include
the implementation  of  effective  programs  for  the   review  and  permitting of  new
sources and the  enforcement of  delegated NSPS and  NESHAP provisions.  A limited
number of  State  and  local  agencies are  continuing  anti-tampering  and fuel  sur-
veillance activities.   State  and local  air  monitoring programs  are  focusing  on
the operation, maintenance,  and quality  assurance  of the  National  Air Monitoring
Systems and completion  and  quality  assurance of  an  effective  State  and local  Air
Monitoring System network.

1983 Explanation of Changes  from Budget  Estimate

     The net increase of +514,780,200 results from the following action:

     -Congressional Action.   (+$14,780,200)  The Congressional  add-on  to this  act-
ivity W^TnriTTroTiOT  to  the   Abatement,   Control   and  Compliance  appropriation
was for the State  Control Agency Resources Supplementation (105  Grants)  program.

1982 Accomplishments

   In 1982, the  Agency  obligated  $88,145,100  for   this  program,  all  for  Abate-
ment, Control  and  Compliance.   Air  management efforts  included  the  development  of
required strategies  for  the  post 1982  attainment  of National  Ambient  Air Quality
Standards for ozone  and  carbon  monoxide;  the continued  development of major mobile
and stationary  source  regulatory programs  required  for the post  1982  extension
areas; and the delegation of new or additional  responsibilities for the regulation
of new  sources.   Enforcement efforts focused on major source  compliance,  review
and permitting of  new  sources,  as well  as  enforcement  of  delegated  responsibility
for National  Emission  Standards for Hazardous Air Pollutants  and New  Source  Per-
formance Standards.  Monitoring  programs   provided for  the maintenance of current
ambient monitoring activities including the National  Air Monitoring  System network
and for progress  toward completion  of  the State and  local  Air  Monitoring  System
network.  Other efforts included the development by  several  States of anti-tamper-
ing and fuel  switching surveillance programs  and the incorporation  of regulatory
reforms including emission trading into current State regulation  efforts.  A limited
number of  States,  at their  own  initiative, undertook efforts  to assess  potential
air toxic problems.

TRAINING                                 '•

1984 Program Request

     The Agency requests  a  total  of $731,600 and 4.0 permanent workyears  for "this
program, of which $254,700  is  for Salaries and Expenses and $476,900 is for Abate-
ment, Control, and  Compliance.   This is an  increase  of $16,600 and  a  decrease  of
$487,100, respectively; and  reflects reduced development of new and  revised train-
ing courses,  as  well  as,  a  decrease  in  the  number  of  area training  centers.
                                         A-76

-------
     Fifteen courses win be offered at the three area training centers for approx-
imately 530  students.   Additionally,  two  self-instructional,  including  slide/tape
presentations and  two  correspondence  courses  will  be  prepared.   Also, one  self-
instructional, including slide/tape presentation  will be  revised.   Implementation
of competitive procurement  to support  State  and local  agency training will  take
place.

1983 Program

     In 1983, the  Agency is  allocating SI ,202,100 and 4.0  permanent  workyears  for
this program, of  which $238,100 is for  Salaries  and Expenses and $964,000  is  for
Abatement, Control, and Compliance.

     Seventeen training  courses  are  to  be  conducted in  the  six  area  training
centers.  Also, 10 new  and  revised  courses/course   materials,  self-instructional
and correspondence  courses are  being  prepared.  In addition,  competitive  procure-
ment mechanisms to support State  and local agency  training activities are  being
investigated.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$340,000 results from the following action:

     -Congressional Action.  (-t-$340,OOQ)   The  Congressional  add-on  to this  acti-
vity of +$340,000  to theAbatement,  Control  and  Compliance appropriation was  for
the academic training program.

1982 Accomplishments

     In 1982, the  Agency obligated $1,016,700 for this program, of which  $216,400
was for Salaries and Expenses and $800,300  was  for Abatement,  Control, and Compli-
ance.  Twenty-seven training  courses  were conducted covering  13 subject  areas  for
958 students at  seven  area training  centers  and  graduate traineeships/fellowships
were provided for  26 control agency  employees.  In  addition, 10  new and revised
classroom, self-Instructional, and correspondence courses were prepared.
                                         A-77

-------
                                         AIR

                        Air Quality Management Implementation

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE *
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN^THOUSANDS}

PROGRAM
Air Quality Management
Implementation
 Salaries & Expenses          $10,131.3   58,731.5   $9,482.7  510,116.9    $634.2
 Abatement Control &             5240.6      534.3      531.2     5294.6    5263.4
 Compliance
                       TOTAL  510,372.5   58,825.8   59,513.9  510,411,5    5897.6

TOTAL:
 Salaries 8 Expenses          510,131.9   53,791.5   59,482.7  $10,116,9    5634.2
 Abatement Control &             5240.6      $34.3      531.2     5294.6    5263.4
 Compliance

Air Quality Management TOTAL  51.0,372.5   58,825,8   59,513.9  $10,411.5    5897.6
Implementation


PERMANENT VIORKYEARS
Air Quality Management            268.1      246.5      246.5      246.5
Implementation

TOTAL PERMANENT WORKYEARS         268.1      246.5      246.5      246,5


TOTAL WORKYEARS
Air Quality Management            294.3      266,8      266.8      266.8
Implementation

TOTAL WORKYEARS                   294,3      266.8      266.8      266.8
                                     A-78-

-------
                                        AIR


                         Air Quality Management Implementation
Budget Request
     The Agency requests a  total  of $10,411,500 and 246.5 permanent workyears,  an
increase of $897,600 from 1983.  Included in this total  is $10,116,900  for Salaries
and Expenses and $294,600 for the Abatement, Control  and Compliance,  an increase  of
$634,200 and $263,400, respectively.

Program pesjHpJipn

     This subactivity provides  resources  for the operation  and maintenance  of  an
air management program in each of the Agency's ten Regional  Offices.   The Regional
program, in partnership with State and local air pollution control  agencies,  serves
to meet the regulatory  requirements specified in Sections 110,  Part C and  Part D
of the Clean Air  Act and EPA implementing regulations.   The  air management program
provides policy guidance  and technical consultation  to States  in the development
and implementation  of the  strategies  and  regulatory programs  for the  attainment
and maintenance of  National Ambient Air  Quality  Standards (NAAQS).   It  also  con-
ducts the necessary review and coordination for approval of State submitted strate-
gies.  The Agency negotiates air program grants to State and  local  control agencies
and provides oversight of their progress  in developing  and implementing  regulatory
programs for standards attainment.

     Major efforts are necessary to provide timely and effective guidance to  States
preparing attainment  strategies  and meeting  the commitments  for the  development
and implementation  of multiple  regulatory programs  essential to the attainment  of
standards.  Similar efforts  are  necessary for State development of  strategies  for
implementing revisions to air  quality  standards  required by the  Act  and for  in-
corporation of  appropriate   regulatory  reforms  into  State  operating  programs.

     The 1977 Amendments to the Act also  impose new  requirements  for  reviewing and
permitting new  sources  to  assure  that they  will  not  cause deterioration  of  air
quality in areas attaining the National Ambient Air Quality Standards, or will  not
delay attainment  In  areas  not yet attaining  the  NAAQS.   Effective  guidance  to
States assuming responsibility  for  these  review and  permitting  requirements  in-
volves Regional efforts.  Specific  guidance to States  1s  frequently required for:
determination of  best  available  emission  control  technology,  analysis  of  air
quality Impact,'selective source-siting, and emission trade-off analyses.

AIR QUALITY MANAGEMENT IHPLEMENTATION

1984Program Requests

     The Agency requests a  total  of $10,411,500 and 246.5 permanent worlcyears  for
this program,  of  which,  $10,116,900 Is for Salaries and Expenses and $294,600  1s
for Abatement,  Control,   and Compliance.   This  Is  an  Increase  of   $634,200  and
$263,400, respectively.  The increase  in  Salaries and  Expenses  reflects increased
payroll and operating costs  primarily associated with the transfer of Public  Health
Service employee  costs  to  EPA  1n  1984.   The  Increase in  Abatement  Control  and
Compliance reflects  funding of National   Oceanic  and   Atmospheric  Administration
(NOAA) meteorologists.

     Mew thrusts in this program for 1984  will  be possible because of  the changing
nature of the  air program  in  other areas.   Consistent with major changes  1n  EPA
policies and the  streamlining  of procedures,  traditional  review and  approval  ef-
forts for State strategies  and  revisions  will continue to require lower resources.
Also, the number  of anticipated actions will  be less as rulemaking for a number  of
                                         A-79

-------
areas, particularly the  post 1982  attainment State  Implementation Plans  (SIPs),
are completed.   State  regulatory  reforms  including  the  increasing  establishment
of generic  programs  will  decrease the  number  of  future   required  EPA  reviews.
Further, the direct review of  new sources  will continue to decline as more  States
accept and implement delegations  for  the prevention  of significant deterioration.
New or expanded guidance and  support efforts  will  be  focused on:  (1) State  develop-
ment of  consistent and  appropriate  strategies  for  attainment   of newly  revised
standards for particulate matter  and  sulfur  dioxide; (2)  assessment of air  toxics
focusing on populated areas having major chemical,  petroleum, or  solvent  industries
consistent with  good  science; and,  (3)  analysis  of strategy alternatives  within
major urban extension areas where attainment  of ozone and  carbon  monoxide  standards
appears to be impossible or highly Improbable.

     Continuing air  management   functions  will  include:  the  negotiation  of  air
grants; direct technical  review  activities  in a limited  number  of States  for  new
sources until such time  as programs  for the prevention of  significant  deteriora^
tion (PSD) are developed;  audit  of State and  local  programs for assessing  opera-
tional capabilities  and   consistency  with   regulatory  requirements;  and,  efforts
toward the  resolution  of  air quality  Issues having  interstate or  international
implications.  Guidance and  support  will  be  provided  to  States  developing  or  im-
plementing high priority  programs  for:  (1)  attaining ozone and  carbon monoxide  in
the most  significant urban  areas;  (2)  undertaking  regulatory  reforms  including
use of  emission  trading  options; (3)  the  use  of  operating  permit programs  for
modifying source emission limits;  and,  (4)  regulation of new  sources,   Rulemaking
actions for  State  strategies  and revisions  will  continue  to  be  finalized in  a
timely manner preventing  any SIP  review backlog.   A  number  of  revisions  are  ex-
pected from  States whose  SIPs  were determined to  be  inadequate upon the  expiration
of the December 31, 1982, attainment deadlines.

     Extramural  resources will  assist four  Regional  offices in  supporting  inter-
agency agreements  with National  Oceanic and Atmospheric  Administration  for  the
detail of meteorologists  to  the  Regional  offices.  These meteorologists  will  pro^
vide necessary modeling expertise for the review of  State submitted strategies  for
attainment of standards and assist States in  Implementation  of new source programs.
In addition,  extramural   resources will  assist  Regions  in analyzing  additional
regulatory reform proposals.

1983 Program

     In 1983, the  Agency is  allocating  59,513,900 and  246.5 permanent  workyears
for this program,  of which $9,482,700 is  for Salaries and  Expenses and  $31,200  is
for Abatement, Control  and Compliance.   In  1983,  the  Regional air  management  pro-
gram is focusing on  completing all  actions  required  for the review and approval  of
State submitted strategies for the post  1982 attainment of NAAQS for ozone  and/or
carbon monoxide within the urban  extension  areas.  These  efforts include  follow-up
with individual   States whose strategies  included schedules for  the development  of
specific regulatory programs.  The program,  upon  request,  is providing  specialized
guidance and support to States developing key regulatory programs within  the exten-
sion areas, including the development of additional controls for  stationary sources
and the  completion  of motor  vehicle inspection  and maintenance  programs  where
such programs are  not  operational.  Also In  1983,  approval  and support efforts  for
a number of other major strategies  and regulatory programs are continuing.  Included
are: (1) the development of regulatory programs in additional States for  the preven-
tion of  significant  deterioration;   (2)  delegation  of  recently   promulgated.  New
Source Performance  Standards and National   Emission Standards  for Hazardous  A1r
Pollutants; (3) regulatory reforms including those for emission trading  and generic
programs; (4)  revisions   of  major  sulfur  dioxide  regulations  having  significant
fuel and  energy  Impacts; and, (5) development of attainment strategies  for lead.
                                        A-80

-------
     Rulemaking actions for  State  strategies  and revisions are being  processed  in
an efficient manner to  prevent  future recurrence of  a  major SIP backlog.   States
recently accepting responsibility  for PSD  are  receiving  guidance  and support  in
conducting essential  engineering and  modeling efforts until  they  acquire  necessary
expertise and experience.  EPA  continues  to perform the necessary  engineering  and
air quality  reviews  for the permitting of  new   sources  for  PSD within the  States
which do not have  program responsibility.  The Regional offices continue to negotiate
air grants  and  maintain oversight of  Agency  performance in  meeting grant  commit-
ments.  Finally,  efforts are being  expanded to  periodically  assess  State environ-
mental problems and their  regulatory  programs  including elements for  program con-
sistency.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$688,100 results from  the  following action:

     -teprpgramiBlngs.  (+$688,100)   During  th:e  development of  the  operating  plan,
several reprogrammings  were  made to this activity  which are not  reportable  under
the Congressional   reprogramming limitations.   These changes   resulted   in  a  net
Increase of  +$691,200  to  the  Salaries and  Expenses  appropriation  and  a net  de-
crease of -$3,100 to the Abatement, Control  and  Compliance  appropriation.

1982 Accomplishments

     In 1982, the  Agency obligated $10,372,500 for this program,  of which $10,131,900
was for Salaries  and Expenses and $240,600 was  for  Abatement,  Control, and  Compli-
ance.  Contract resources  were  provided for modeling support  and  special  analyses
for regulatory  reform  proposals,   the Regional   air management efforts focused  on
the implementation of  improved  procedures for the  expeditious  review  and approval
of State  strategies  and  regulations   and  the elimination  of  a  major backlog  of
required rulemaktng for State   Implementation Plans.   Rulemaking actions included
State regulations for  the  control  of  additional  sources of volatile  organic com-
pound (VOC)  emissions;  corrections of  deficient 1979 State  Implementation  Plans;
State programs  for  the  prevention of significant  deterioration;   development  of
SIP strategies  for  attainment   of  NAAQS  for  lead;  and  State  programs for  imple-
menting regulatory reforms  Including  those  employing emission  trading  options  and
the establishment of generic programs.

     Guidance was provided  to   States  developing specific  stationary  source con-
trols for  volatile  organic compounds;  automotive inspection and  maintenance  pro-
grams, and to those States preparing post-1982 attainment  strategies for  ozone  and
carbon monoxide.  The  program  continued to foster  and  guide  State  development  of
programs for  the  prevention of significant  deterioration  and the delegation  to
States of  New  Source  Performance  Standards  and National Emission Standards  for
Hazardous Air Pollutants, achieving a  significant increase in the  number  of  States
assuming program  responsibility.   Direct review  of new  sources was  continued  in
the non-delegated  States.   Air  grants negotiations were  conducted and  oversight
of State and local agency  performance  in  meeting grant  commitments was maintained.
                                         A-81

-------
                                         AIR

                       Trends Monitoring & Progress Assessment

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 VS  1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Ambient Air Quality
Monitoring
 Salaries & Expenses
 Abatement Control 4
 Compliance
        32,760.7   $2,997.8   $3,043.6    $3,318.2     $274.6
           $94.3     $248.4     $185.6      $135.6     -$50.0

TOTAL   $2,855.0   $3,246.2   $3,229.2    $3,453.8     $224.6
Air Quality 4 Emissions
Data Analysis &
Progress Assessment
 Salaries & Expenses
 Abatement Control 4
 Compliance
TOTAL:
 Salaries i Expenses
 Abatement Control &
 Compliance

Trends Monitoring &
Progress Assessment
        $1,466.5   $1,427.5   $1,427.5    $1,631.0    $203.5
          $220.4     $203.9     $203.9      $203,9

TOTAL   $1,686.9   $1,631.4   $1,631,4    $1,834,9    $203.5
        $4,227.2   $4,425.3   $4,471.1    $4,949.2     $478.1
          $314.7     $452.3     $389.5      $339.5     -$50.0
TOTAL   $4,541,9   $4,877.6   $4,860.6    $5,288,7     $428.1
PERMANENT WORKYEARS
Ambient Air Quality
Monitoring

Air Quality & Emissions
Data Analysis 4
Progress Assessment

TOTAL PERMANENT WORKYEARS
            77.0       82-.1       82.1       82.1
            31.0       29.9       30.2       30.2
           108.0      112.0      112,3      112,3
TOTAL WORKYEARS
Ambient Air Quality
Monitoring

Air Quality & Emissions
Data Analysis &
Progress Assessment

TOTAL WORKYEARS
            83.3


            33.9



           117.2
 87.8


 34,0



121.8
 87.7


 32.8



120,5
 87.8


 34.0



121.8
 .1


1.2



1.3
                                      A-82

-------
                                       AIR


                     Trends Monitoring and Progress Assessment
Budget Request
     The Agency  requests  a total  of  $5,288,700  and 112.3 permanent workyears  for
1984, an increase  of  $428,100  from  1983.   Included in  this  total  is  $4,949,200  for
Salaries and Expenses  and  $339,500  for the Abatement,  Control, and  Compliance,  an
increase of  5478,100  and a  decrease  of $50,000,  respectively.   The  increase  re-
flects increased payroll and operating costs primarily  associated  with  the transfer
of Public Health  Service  employee  costs to  EPA  in 1984.  The decrease  reflects  a
reduction in the Ambient Air Quality Monitoring program.

Program^Description

     This subactivity covers work  related to monitoring ambient air quality,  deter-
mining source emissions, analyzing  their relationships,  and assessing  the progress
made toward the attainment of environmental goals.

     Ambient Air Quality Monitoring— Activity in this program includes: (1) EPA's
management overview  of  State ambient  air  quality monitoring  networks,  associated
laboratory and  field  quality assurance  activities,  and the  Implementation  of  air
monitoring strategies  as  delineated in the air monitoring  regulations promulgated
in 1979 (40 CFR 58); (2) the coordination of Regional  and State field investigation
activities for collecting ambient air quality samples for subsequent sample analysis
and related quality  control; (3)  reviewing  of source  emissions  data; and  (4)  the
necessary management  and  coordination to  ensure  timely  storage and validation  of
data obtained.

     Air Qua]Ity and EmissipnsDataAnalysis and Progress Assessment.—  Major  ac-
tivities•include:   national 'codr dihafTon"*bT° Regional  office,'"	State and local  am-
bient monitoring programs; issuance of  new and revised regulatory requirements  and
related technical  guidance; active  oversight  and auditing  of  the  National  Air
Monitoring Stations  (NAMs)  to ensure  continuing  conformance  with all  regulatory
criteria; operation  of computer  systems  for storing,  retrieving,  and analyzing
ambient air  quality  and emission data;  development and implementation  of  systems
to meet  user requirements;  and preparation  of  trends  analyses  and  related  air
quality and  emission progress  assessments for  policy evaluation and development
and to meet public information needs.

AMBIENT AIR QUALIJY HONITORING

1984 Program Request

     The Agency  requests  a  total  of $3,453,800  and 82.1  permanent workyears  for
this program, of  which  $3,318,200  is  for Salaries and  Expenses and $135,600  1s  for
Abatement, Control, and Compliance.  This 1s an Increase of $274,600 and a decrease
of $50,000,  respectively.   The increase reflects increased payroll and operating
costs and the  decrease represents   a  reduced  need  for extramural support  for  the
development of environmental reports.

     Overview and  management of State air  monitoring programs  including  Section
105 grants review  will  continue.   The Agency will perform quality assurance audits
of State  monitoring  systems  and  performance audits  of  selected NAMs monitors.
This program  will  validate  and coordinate the  timely  reporting  of  air  quality
and emission data  to  EPA data  banks.   In  addition, this program  will prepare  air
quality environmental management reports and respond to air  emergency episodes  or
spills.  The Agency will conduct reviews of monitoring networks and data involving
                                         A-83

-------
highly controversial or  technically  difficult permits  for  the prevention of  sig-
nificant deterioration (PSD) program.   Annual  network  review  for most  States  and
evaluation of  monitoring  sites  prioritized  by  population and  pollutant  levels
will be performed.  The Agency will  assist  in  1982  attainment  analyses and assess-
ments for the  30  largest  urban  areas in terms of pollution levels  and population.

     The program  will  evaluate  State developed partlculate  matter  (PM)  monitoring
networks in support of new EPA  ambient air quality standard as well  as  coordinate
and assist State toxic monitoring .programs.   This  program will  provide coordination
and technical   support  for  EPA's  Office  of  Research  and Development  and State field
efforts to develop an acid deposition data  base.

1J83 Program

     In 1983,  the Agency  is  allocating  $3,229,200 and  82.1  permanent  workyears  for
this program,  of  which S3,043,600 1s for Salaries and  Expenses and  $185,600  is  for
Abatement, Control,  and  Compliance.   The  five-year program  for implementing  the
air monitoring strategy is being completed  in 1983.  The State and local  air  mon-
itoring systems  (SLAMS)   network  Is  being  completely  Installed  and  operated  by
State and local  agencies   during the fiscal  year.  The Agency is  providing tech-
nical assistance  in  conducting  partlculate matter  and toxics  monitoring  studies.
The Agency  is  continuing  quality  assurance  audits  of  State monitoring  systems
and performance audits of  selected NAMs monitors and is continuing  to validate and
store air quality and emissions  data  1n the EPA data banks.

1983 Explanat1on of Changes JFrom Budoe t Estimate

     The net decrease of -$17,000 results  from the following action:

     -Reprogrammings.  (-$17,000)  During  the  development  of  the  operating plan,
several reprbgramuririgs were  made to  this activity  which are  not. reportable under
the Congressional  reprogrammlng limitations.   These   changes   resulted  in  a  net
increase of +$45,800 to the  Salaries and Expenses appropriation and a net decrease
of -562,800 to the Abatement, Control and  Compliance appropriation.

1982 Accomplishments

     In 1982,  the Agency obligated  $2,855,000 for  this  program, of which £2,760,700
was for Salaries and Expenses and $94,300 was for Abatement,  Control, and Compliance.
Contract funds supported  preparation  of  air quality profiles.   The Regions continued
to evaluate preparation of air quality  profiles and  State monitoring networks,  per-
form quality assurance audits, coordinate  State partlculate matter data activities,
and validate and coordinate  storage  of  air data in  national emission  data  systems.
Evaluations for conformance  of  the State and local  air monitoring systems (includ-
ing NAMs) monitoring  sites,  located primarily in  non-attainment  areas,  and  for
energy conversion  sources  were  performed.   In  addition, quality assurance  audits
were performed of large local agency  monitoring systems.

AIR: QUALITY AND EMISSIONS DATA.ANALYSISI AMD PROGRESS ASJESSMEJT

1984 Program Request

     The Agency  requests  a  total  of 51,834,900 and  30.2  permanent  workyears  for
this program,  of  which $1,631,000 is for Salaries and  Expenses and  $203,900  is for
Abatement, Control, and Compliance.  This  is  an Increase of $203,500 for Salaries
and Expenses and reflects  increased payroll  and operating costs.

     The existing air quality and emission data systems will  be  operated and guidance
will be provided to users.  Responses to approximately  500 requests  for air quality
and/or emission data will  be provided.  Development of an improved  air data  system
will continue through design and development of software, implementation of vendor-
supplied data  manipulation  and  analysis  software,  and conversion  of  a  portion of
                                        A-84

-------
the data needed  for  the  new system.   Support  will  be provided to the  35  agencies
using EPA developed  data  systems.   This  program will analyze  ambient and  emission
trends and assess progress towards attainment and will prepare statistical  analyses
to support new or  revised ambient  standards.   Software,  data files,  and EPA's Part
58 regulations on  Ambient Monitoring  will  be  modified  to  accommodate  changes  to
the ambient  standards.   National  oversight of  Regional office,  State and  local
air monitoring programs will be  provided.   The NAMs  will be  managed through  main-
tenance of  a site  information  base,  review  of ambient  data,  and the  issuance
of status  reports  on  regulatory compliance.   To support  the non-criteria  moni-
toring programs of State and local  agencies, guidance dealing with sampling methods
and frequency, network design  and  siting,  quality control, data  reduction  and re-
porting, and trends and data analyses will  be developed.

1933 Program

     In 1983, the  Agency is allocating  a   total  of $1,631,400 and  30.2 permanent
workyears for this program,  of which  $1,427,500  Is  for  Salaries and Expenses and
$203,9001s  for Abatement,  Control,  and   Compliance.   All  major   activities  are
continuing: including operation  of  existing air  data systems; production of annual
report and other statistical analyses; national  oversight  of State and  local  moni-
toring programs; and evaluations  of  NAMs  including on-site  audits.   Also,  the
program 1s evaluating and  issuing  status reports on compliance of  SLAMS  networks
with regulations.  Revised  monitoring  regulations to reflect  revision  to  particu-
1 ate matter  {PM),  sulfur  dioxide (SOg),  and nitrogen dioxide (NOz)  ambient  stan-
dards are being  proposed.   In  addition, with  regard to the  new air data  system,
the design and  development  of  conversion  software   for  air  quality  data  1s  being
completed.  The  strategy  for non-criteria  (toxic)  monitoring will   be  implemented
through establishment of  a  pilot center In  one city and the  issuance  of  guidance
on monitoring methods  and the design  of  sampling  programs  for  toxic  pollutants.

1983 Explanation of Changes from Budget Estimate

     There fs no change to this program.

1982 Accompli shments

     In 1982, the Agency obligated $1,686,900 for this program, of which $1,466,500
was for Salaries and Expenses and $220,400  was  for  Abatement,  Control,  and Compli-
ance.  Contract  funds  supported  regulation review and revision,  guidance  develop-
ment, operation and maintenance of  air  pollution  data storage  and retrieval  systems,
and progress toward  the  development of a  new  data  system.   Emphasis continued  on
operation and updating of  existing  air data systems, and training and  guidance to
system users.  This  program  provided support to 35  State and local  agencies  using
EPA developed data  systems.  Other major  activities  included preparation of special
air quality  and  emission  analyses,   statistics and  reports,  national oversight  of
State and local  monitoring  programs, evaluation of  NAMs including on-site audits,
and work toward revising monitoring regulations to reflect revisions  to the ambient
standards for S02, PM,  and  NOg-   In addition, the  Agency  developed  a program plan
for implementing a  strategy for non-criteria  pollutant monitoring  {a  program  to
prepare for  future  monitoring  of  toxic  pollutants   by States),  and completed the
preliminary systems analysis of software, for the new air  data system.
                                         A-85

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                      ENVIRONMENTAL PROTECTION AGENCY

                            1984 Budget Estimate

                             Table of'Contents


                                                                            Page

AIR

 ENFORCEMENT
    Stationary Source Enforcement	     A-87
       Stationary Source Enforcement	     A-88
       Stationary Source Enforcement - Legal & Enforcement Counsel..,..     A-91
    Mobile Source Enforcement..	     A-92
                                    A-86

-------
                                         AIR

                            Stationary Source Enforcement

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982 '   ESTIMATE   ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 VS  1983

                                •(DOLLARS IN THOUSANDS)

PROGRAM
Stationary Source
Enforcement
 Salaries & Expenses          $12,800.2  $10,101.5   59,850.7  $10,356.7    $506.0
 Abatement Control &           S9.092.9   $5,019.1   $5,019.1   $4,808.7   -S210.4
 Com pi iance
                       TOTAL  $21,893.1  $15,120.6  $14,869.8  $15,165.4    $295.5

Stationary Source
Enforcement - Legal &
Enforcement Counsel
 Abatement Control 4        •     $599.9
 Compliance
                       TOTAL     $599.9

TOTAL:
 Salaries & Expenses          $12,800.2  $10,101.5   $9,850.7  $10,356.7    $506.0
 Abatement Control 4           $9,692.8   $5,019.1   $5,019.1   $4,808.7   -$210.4
 Compliance

Stationary Source      TOTAL  $22,493.0  $15,120.6  $14,869.8  $15,165.4    $295.6
Enforcement


PERMANENT WORKYEARS
Stationary Source                 368.8      273,4      273.2      271,9      -1.3
Enforcement

TOTAL PERMANENT WORKYEARS         368.8      273.4      273,2      271.9      -1.3


TOTAL WORKYEARS
Stationary Source                 398.3      289,6      289.3      287.6
Enforcement

TOTAL WORKYEARS                   398.3      289.6      289,3      287,6
                                     A-87

-------
                                        AIR


                              Stationary Source Enforcement
Budget Request
     The Agency requests  a total  of $15,165,400  and  271.9 permanent workyears  in
1984, an increase of $295,600 and a decrease of 1.3 permanent  workyears  from 1983.
Included in this  total  is  $10,356,700  for  Salaries  and  Expenses and  $4,808,700
for Abatement,  Control  and  Compliance,  an  increase  of  $506,000  and  a  decrease
of $210,400 respectively.   The  increase  reflects  increased  payroll  and  operat-
ing costs and  the  reduction in extramural  funds  reflects  a shift  towards  greater
reliance on EPA personnel  for conducting  inspections.

Program Description

     The stationary source  enforcement  program provides  support to and  coordina-
tion with State and local  air  pollution control agencies  to ensure that  stationary
sources achieve and maintain compliance with  the requirements  of the Clean Air Act,
as amended in  1977.

     Stationary Source  Enforcement -This  program  focuses  primarily on  enforcement
of the  requirements  established  under  State  Implementation  Plans.  The  enforce-
ment program  also  focuses on  new  source  programs  such  as New  Source  Performance
Standards and National  Emission Standards  for Hazardous  Air Pollutants.

     As a  result  of efforts made  by industry  in controlling their emissions  and
the effectiveness  of   State,  local   and  Federal  control  programs, approximately
ninety-one percent of the  more  than  18,000 major stationary sources have  achieved
compliance with all  applicable air  quality  limitations.   An  additional  2.6% (476
sources) are  meeting  acceptable  compliance  schedules.   Although  this  represents
a significant  achievement,  government efforts must  continue to  ensure that  re-
maining sources come into  compliance with  present standards or any new  or  revised
standards and,  once  controls  are  installed,  compliance  with  standards 1s  main-
tained.  EPA  will  continue  to provide  State  and  local  agencies with  technical
support in  their  efforts to  realize this  goal  and,  where appropriate,  initiate
their own actions.

     Stationary  Source Enforcement-legal  and  Enforcement Counsel — This  program
element provides contract funds to support a  portion of  the enforcement data system
and to  assist In case  development and training activities related to  Air  Quality
Enforcement.

STATIONARY SOURCE ENFORCEMENT

1984 Program Request

     The Agency requests  a  total  of  $15,165,400 and 271.9  permanent workyears  for
this program,   of which  $10,356,700  1s  for the  Salaries  and Expenses  appropriation
and $4,808,700  1s  for   the  Abatement,  Compliance and  Control  appropriation.   Ex-
tramural funds  will  be used  for enforcement  case  support; compliance  monitoring
and field surveillance; Regional data management  support;  development  of technical
workshops and  manuals  to  enhance  the  capabilities  of  State  and  local  programs;
providing limited  assistance  to  specific state  cases;  and  Regional   industrial,
technical, and economic studies.

     In 1984,   the  stationary  source  compliance  program  will  carry  forward  the
basic thrust  of the  1983 budget.  The major  focus of  the stationary  source com-
pliance program for 1984 is to ensure,  working 1n close  cooperation with State and
local agencies, that noncomplying  significant  sources  in nonattalnment  areas  are
                                        A-88

-------
brought into  compliance  consistent with  the  constraints  of  the Clean  Air  Act.
Efforts to address violators of  requirements,  established in  Part  D SIPs  (primarily
relative to volatile organic -compounds) will  continue  in  1984, as will  efforts  to
ensure continued high compliance  levels  with NSPS  and NESHAPs requirements.  EPA
will continue to  encourage States  to  assume the  lead role  through  provision  of
1 imi ted direct  case  support  when  requested.   The compliance program will  continue
to provide  assistance  in  selected Federal  judicial   referrals,  consent  decrees,
antf Section 120 actions.   Also,  EPA will  issue  administrative orders as  necesary
in environmentally significant cases  where States  cannot  or will not take  appro-
priate enforcement action.

     The 1984 budget reflects a  major  shift in  the way that EPA will conduct in-
spections.  EPA will  rely more on  its own personnel  rather than contractors for
most classes  of inspections.  Contractor  inspections  will  be limited primarily  to
inspections of non-delegated NSPS and  NESHAP  sources.

     Efforts for building  the technical-  capabilities  of State and local  programs,
began in 1982 and  expanded in  1983, will  continue in 1984.  This effort  includes
development and presentation  of  technical  workshops,  development  of  compliance
manuals, continued development of  State  pilot programs,   and  evaluation of  State
compliance procedures.    In addition,   to  ensure  the   validity  of  the  compliance
data base,  EPA  will  initiate a  qualitative  audit  of  State compliance  monitoring
techniques in 1984.

     Other major  program   accomplishments  for 1984  will   include:  development  of
three technical  workshops  to enhance  the  capabilities  of  State and local  programs
(with 60 workshops being  presented  to  Regional,  State  and  local  personnel);  devel-
opment of four  new compliance manuals  for State  and local  programs; and  assistance
to five  additional  State  compliance   data  systems.   During  1984,  the  compliance
program will  continue  to develop  civil   and criminal  referrals  in conjunction
with the Office of Legal   and Enforcement  Counsel.   There  are plans to  conduct  an
estimated 1,694  inspections, and  issue  approximately  41  administrative  orders
during 1984.

1983 Program

     The Agency is allocating a total   of  $14,869,800 and 273.2 permanent workyears
for this program  in  1983,  of  which $9,850,700  is for Salaries  and Expenses and
$5,019,100 is for extramural purposes  under  the  Abatement,  Compliance and Control
appropriation.  The extramural  funds are  being used for enforcement  case  support;
compliance monitoring and field   surveillance;  Regional data  management  support;
development of  technical   workshops and   manuals  to  enhance the  capabilities  of
State and local  programs;  providing limited assistance to  specific State case; and
Regional industrial,  technical, and economic  studies.

     The major  focus  of   the Stationary  Source Compliance  program  for 1983  as  it
will be in  1984 is  to  ensure that  noncoraplyfng  significant sources in  nonattain-
ment areas  are  brought  into compliance  consistent with  the constraints of the
Clean Air Act.  Efforts  are  being intensified to addressing violators of  require-
ments (primariTy  relative to  volatile organic  compounds)  established  in  Part  D
SIPs, many of which  have  compliance dates in 1983.  Emphasis  is  also  being placed
on assuring continued high compliance levels with  NSPS and NESHAPs  requirements,
through support of  State  actions  and, as required, independent  EPA  actions. The
stationary source  compliance program  continues  to  provide assistance in  selected
judicial referrals, consent decrees, and  Section  120  actions,  and to  Issue notices
of violation  and  administrative  orders   as  necessary.  In  addition, the  program
continues to manage the Compliance  Data  System,   and  make  applicability  determina-
tions under NSPS and NESHAPs.

     EPA continues to  conduct  Inspections,  review  performance tests, monitor en-
forcement actions, issue   waivers  and permits,  make  noncompliance penalty  deter-
m1nat1ons» and  bring enforcement  actions  in  environmentally  significant  cases
                                         A-89

-------
 where States cannot  or will  not  take such  actions,  despite  EPA  effort.   To  en-
 courage States  to assume  primary  responsibility,  EPA  provides limited direct case
 assistance to State  enforcement efforts when  requested.

      Efforts for building  the technical  capabilities of  State and local  programs
 are being increased in  1983.   This  includes  development and presentation  of  tech-
 nical workshops, development  of  compliance  manuals,  further development of  the
 State pilot program  efforts begun in 1982, and evaluation of  State compliance pro-
 cedures and follow-up support.

      The program continues  to provide  technical  and cost  evaluations of  applica-
 tions submitted by  steel   companies  under the provisions  of  Steel  Industry Com-
 pliance Extension Act (SICEA).  Also,  final promulgation of  second-round  nonferrous
• smelter orders   establishing  a  regulatory   framework   for   compliance   extensions
 through January 1,  1988, is anticipated during  1983.

      Other program accomplishments in 1983 include  development of three new  tech-
 nical workshops to enhance the capabilities  of  State  and  local  programs  (with  50
 workshops being presented  to  Regional,   State  and local  personnel), development
 of four compliance manuals for State  and local  programs,  and assistance to five
 additional State compliance  data  systems.   During  1983,   the compliance program
 continues to assist the Office of Legal and  Enforcement Counsel  in the development
 of civil  and  criminal   referrals.   In  addition, the  program  is  to  conduct  1,835
 inspections and issue an estimated 43  administrative orders  in 1983,

 1983ExplanationofChanges from Budget Estimate

      The net decrease of -$250,800 results from the  following actions:

      -Congressional  Action.  |+$6,OQO)    This  increase   includes   +$6,000  of   the
 $10.5 millionSalaries and  Expenses  add-on  which  supports  the 480   additional
 permanent full-time  workyears provided  to the Agency.

      -Reprograinmi'ngs.   (-$256,800)   During the development  of the operating  plan,
 several reprogrammings were  made  to this activity which are  not  reportable  under
 the Congressional  reprogramming  limitations.   These  changes  resulted  in  a  net
 decrease of -$256,800 to the Salaries  and Expenses  appropriation.

 FY 1982_Accomplishment5

      In  1982,  the   Agency   obligated   $21,893,100  for  this program,  of  which
 $12,800,200 was for Salaries  and Expenses and $9,092,900 was  for Abatement Control
 Compliance.  Extramural resources  were  utilized for  enforcement case development
 activities; compliance  monitoring  and field surveillance;  Regional  data manage-
 ment; and Regional  industrial, technical,  and economic  studies.

      In 1982, the Agency  refocused the  direction  of this  program to ensure that
 State and local air pollution control  programs assumed the primary role in  ensur-
 ing that  significant  sources  of air  pollution are brought into compliance.   EPA
 Increased efforts to  enhance State and  local  program  technical  capabilities through
 expansion of its Inspection  workshop  programs, assisted the  States in development
 of continuous compliance pilot  programs,  and through providing limited  assistance
 in specific cases.  EPA  began to redirect its  own enforcement efforts  toward  the
 most significant  violators,  including   larger  sources  in  nonattainment  areas.

      During 1982,  the  program provided technical  and  cost  evaluations of  applica-
 tions submitted by  steel   companies  under the provisions  of the SICEA  of  1981.
 Also, work  was  begun  on  development of  second-round  nonferrours  smelter  orders
 establishing a   regulatory  framework  for  compliance   extensions  through January
 1, 1988, as provided  in the Act.
                                         A-90

-------
     Program accomplishments during 1982 Included development of four new technical
workshops to enhance  the  capabilities of  State  and local programs  (with  52  work-
shops having been  presented to Regional,  State  and local  personnel),  implementa-
tion of  three  continuous  pilot programs, development  of five  new  compliance man-
uals for  State and local  programs,  and providing  assistance  to  eight additional
State compliance data  systems.   During 1982, EPA issued 20  administrative orders,
and conducted 2,093 inspections.

STATIONARY SO.URCE £NFCIRCEMENT:-IE6AL AND ENFORCEMEHT COUNSEL

1984 Program Request

     The Agency requests no funds for this program.

1983 Program

     The Agency 1s  allocating  no  funds for this program element in 1983.  Develop-
ment of  the  docket system  has  been  completed  and the  case  development functions
will be centralized and carried out by the Office of Legal and Enforcement Counsel.

1982 Aceomp1i shments

     In 1982,  the  Agency  obligated $599,900  in  Abatement, Control  and Compliance
funds to  provide  support  to the  enforcement  docket system,  case  development,  and
training efforts.
                                        A-91

-------
                                        AIR
                              Mobile Source Enforcement
                                ACTUAL
                                 1982
                  BUDGET
                  ESTIMATE
                    1983
          CURRENT
          ESTIMATE
            1983
         ESTIMATE   INCREASE +
           1984    DECREASE -
                  1984 VS  1983
PROGRAM
                                (•DOLLARS IN THOUSANDS)
Mobile Source
Enforcement
 Salaries & Expenses
 Abatement Control 4
 Compliance
TOTAL:
 Salaries & Expenses
 Abatement Control &
 Compliance

Mobile Source
Enforcement
        S3,608.8
        $1,662.8
$3,522.6
$1,896.5
$3,696.6
$1,896.5
S3,733.2
$1,821.5
        S3,608.8
        $1,662.3
$3,522.6
$1,896.5
$3,696.6
$1,896.5
$3,733.2
$.1,821.5
 $36.6
-$75.0
                       TOTAL   $5,271.6   $5,419.1   $5,593.1   $5^54.7     -$38.4
 $36.6
-$75.0
TOTAL   $5,271.5   $5,419.1   $5,593.1    $5,554.7     -$38.4
PERMANENT WORKYEARS
Mobile Source
Enforcement

TOTAL PERMANENT WORKYEARS
            77.4
            77.4
    56.4
    56.4
    61.2
    61.2
    60.0
    60.0
  -1.2
  -1,2
TOTAL WORKYEARS
Mobile Source
Enforcement

TOTAL WORKYEARS
           105.1
           105.1
    74.8
    74.8
    80.3
    80.3
    78.4      -1.9
    78.4      -1.9
                                      A-92

-------
                                         AIR


                               Mobile Source Enforcement


Budget Request

     The agency  requests  a total of 55,554,700 and  60.0 permanent workyears  for
1984, a decrease  of  $38,400 and 1.2 workyears  from 1983.  Included in  this  total
is S3,733,200  for  Salaries  and  Expenses  and  $1,821,500  for  Abatement,   Con-
trol and Compliance,  with an increase of $36,600 and a decrease of 575,000,  respec-
tively.

Prog ram De sc ri p tf on

     The Mobile  Source  enforcement  program  is  directed  primarily  towards  achiev-
ing compliance with  motor vehicle emission  standards  and fuel  regulations as  re-
quired by the  Clean  Air  Act.   The  major  goals  and objectives are to;  (1)  assure
that new vehicles meet  emission standards; (2)  assure  that vehicles meet emission
standards in  use;  (3)  assure  that  emission  control  systems  are  not removed  or
rendered inoperative; (4)  assure that  harmful  additives  are  not present in  gaso-
line; and (5) administer the California and statutory emission  waivers.

MOBILE SOURCE ENFORCEMENt          ,-

1984Program Request

     The Agency  requests  a total of $5,554,700 and  60.0 permanent workyears  for
this program,  of which  $3,733,200 is  for the Salaries  and Expenses  appropriation
and $1,821,500 is  for the  Abatement,  Control  and  Compliance  appropriation.   This
represents an increase of  $36,600 and a  decrease of  $75,000, respectively from  1983.
The increase  in  Salaries  and  Expenses  reflects  increased personnel costs  and  the
decrease in extramural funds reflects a  slight  reduction  in contractor support for
testing.  Extramural   funds will  be used  for  the  recall  program, fuel  switching
observations, fuels inspections, and data management and analysis.

     The recall  program  will   be increased to  480  tests to assure compliance  of
in-use vehicles  with emissions  standards.  Eighty percent  of  the  fleet will  be
sampled for testing during Its useful life.

     This program also  processes fuel  waivers;  the Agency  expects  waiver requests
for a number  of  new  additives for gasoline  and diesel  fuels.   Emission warranties
and aftermarket parts certification programs will  be" administered.  Warranty claims
filed with EPA will  be  investigated.  Seventeen Selective Enforcement Audits  (SEA)
of manufacturer  facilities will  be conducted  to  ensure that  new vehicles  meet
emissions requirements.   The imports and  waivers  programs will  continue to provide
for analysis  of  air  expected   five  California waiver requests  and any  remaining
carbon monoxide  or nitrogen oxide statutory waivers, and -to administer the program
for control   of the  importation of  vehicles.   An  effort will  be devoted to  the
averaging feasibility study and analyses of compliance programs  based on assembly
line and in-use data.                   ;

     Anti-tampering and anti-fuel  switching activities  will  continue to focus  on
development of EPA  cases,  contractor  investigations,  support to  State  programs,
and unleaded  fuel  inspections.   Fuel  switching  surveys  will   cover   10  areas  and
focus on the  nature   of  specific problems.  The  Federal effort will  be aimed  at
providing States  with  the basis  for  adopting  their  own  programs  and  support
for program  development.    EPA  field  offices  will  target new car  dealerships,
fleet facilities, and commercial repair  facilities,  and  provide investigative  and
case development  support  to State and  local tampering  and  fuel  switching programs
to encourage Increased State and local  activities.  The field offices  will initiate
enforcement actions for violators referred by State and local  personnel, and supply
personnel to supplement State and local Investigations when requested.
                                        A-93

-------
1983 Program

     In 1983,  the  Agency is  allocating  a total  of  55,593,100 and 61.2  permanent
workyears for this program,  of which $3,696,600  is  for Salaries and Expenses  and
$1,896,500 is  for  Abatement,  Control and  Compliance.   Resources are concentrated
in the recall  program to  assure  compliance  of in-use vehicles with emission  stan-
dards.  Emphasis is being placed on in-use compliance,  with 17 SEA being  performed.
The tampering  and  fuel  switching  programs  are continuing  at reduced levels with
efforts to assist State and local programs receiving  increased emphasis.

     The activities  of  the  fuels  program   include  conducting  combined  unleaded
gasoline and vapor  recovery inspections at  service  stations and fleet  dispensing
facilities.  The  Agency  continues  to  monitor  lead  usage   reports  and  the  status
of refiner  efforts  to  achieve  compliance   with  the  lead  phasedown  program  and
administer the emission and fuel  waivers as  required.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$174,000 results from the following action:

     -Reprogrammings.  (+$174,000)  During the  development of the  operating  plan,
several reprogrammings were  made to this activity which  are not reportable  under
the Congressional   reprogrammjng   limitations.   These  changes resulted  in  a  net
increase of +$174,000 to the Salaries and Expenses appropriation.

1982 Accomp11shments

     In 1982, the Agency obligated $5,271,600:, of which $3,608,800 was for Salaries
and Expenses and  $1,662,800 was  for Abatement, Control and  Compliance.   Review of
the lead  phasedown  rules  was  Initiated  and completed  in  one  year.   The  Agency
performed 14,000  field  inspections and 1,000  Federal  investigations  for  unleaded
fuels and completed  300  Federal  enforcement  cases.  In 1982,  the Agency  performed
25 SEA, 612 recall tests, and completed 42 recall  Investigations.
                                        A-94

-------
Page Intentionally Blank

-------
Water Quality
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
                                                                            Page
HATER QUALITY                                                               WQ-1.

    RESEARCH & DEVELOPMENT
       Water Quality Research.....	  WQ-9
       Municipal Wastewater	  WQ-21
       Industrial Wastewater	  WQ-30
    ABATEMENT & CONTROL
       Water Qua!i ty State Programs Management	  WQ-39
          State Programs Management....	  WQ-41
          Great Lakes Program	,.	  WQ-46
          Chesapeake Bay Water Quality Study	  WQ-47
       Effluent Standards 4 Guidelines	  WQ-50
       Grants Assistance Program	,	••	  WQ-55
          Clean Lakes Program	.		  WQ-56
          Control Agency Resource  Supplementation (Section 106)	  WQ-57
          Training Grants (Section 104)	,	  VQ-59
       Water Quality Strategies Implementation...	,	  WQ-60
          Dredge & Fill		  WQ-63
          Ocean Disposal Permits.	,		,	  WQ-63
          Environmental Emergency Response & Prevention...........	  WQ-66
          Standards & Regulations	,	  WQ-67
       Water Quality Monitoring & Analysis..	...	  WQ-70
       Municipal Source Control.	,	  WQ-74
          Municipal Waste Treatment Facility Construction.................  WQ-77
          Corps of Engi neers	  WQ-81
          Waste Treatment Operations 4 Maintenance....,	  WQ-82
          NEPA Compliance - Municipal Hastewater Treatment
            Facil i ty Construction	  WQ-83
    ENFORCEMENT
       Water Quality Enforcement	  WQ-85
          Water Quality Enforcement....	,...,..,..,,....	  WQ-86
          Water Quality Enforcement - Legal & Enforcement Counsel	  WQ-89
       Water Quail ty Permi t Issuance...;....	  WQ-90
                                        WQ-1

-------
                                    WATER QUALITY

                                ACTUAL   BUDGET
                                 1982    ESTIMATE
                                           1983
                       CURRENT    ESTIMATE   INCREASE  +
                       ESTIMATE     1984    DECREASE  -
                         1983              1984 VS 1983
APPROPRIATION
                                (DOLLARS IN  THOUSANDS)
 Salaries 4 Expenses
 Abatement Control  &
 Compliance
 Research 4 Development
 Operations, Research &
 Facilities

TOTAL, Water Quality
$101,729.5  $92,084.7   $95,940.0  $83,728.8  -$12,211.2
$116,797.7  $85,029.3  $108,861.0  $61,324.0  -$47,537.0

 $31,719,0   18,851.7   $11,197.9   $6,316.5  -$4,881.4
    $700.0
$250,946.2 $185,965.7 5215,998,9 $151,369.3 -$64,629.6
PERMANENT WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
   2,271.9    1,849.5    1,950.6    1,662.9      -287.7
   2,671.1    2,292.0    2,379.3    2,065.5      -313.8
$314,122.0 $212,285.5 $255,108.0 $205,682.0  -$49,426.0
$292,983.0
                                     WQ-2

-------
                                   WATER QUALITY


QVERVI_EW AND STRATEGY

     The Agency derives  its  water  quality objectives from two  statutes:  the  Clean
Water Act and the .Marine Protection, Research and Sanctuaries Act.  Both laws direct
the Agency, and  the  States,  to take measures to protect the Nation's  waters  so  as
to safeguard public health, recreational use, and aquatic life.

     The Agency's  charge  under the Clean Hater  Act  is  to meet the goals  of  clean
water through the  use  of  the  following  mechanisms:  (1)  making  regulatory decisions
based on sound, comprehensive scientific and technical assessments;  (2)  implementing
control  measures directly, or indirectly through State and local programs;  (3) pro-
viding technical,  managerial,  and  administrative assistance to State  programs,  as
well  as  overviewing  them;  and (4)  providing financial  assistance to  supplement
State and local resources.

     The Clean  Water Act  relies   on  a well-defined  partnership  between  EPA  and
the States. For  example,  many of  EPA's statutorily mandated programs  can  be  dele-
gated to the  States, including the  permitting  authority prescribed under  Section
iQ2 of  the Act,   known  as  the  National  Pollutant  Discharge  Elimination  System
(NPDES). States may  also  sign delegation  agreements  to  administer  the  construction
qrants program.  In the water  quality  standards  program, the Agency develops  water
quality criteria based  on scientific judgments,  the  States  adopt  stream standards
defining designated uses  and  site-specific  criteria  to  protect  those  uses, and EPA
reviews the State standards.

     The Act  envisions  a  dual  approach  to  pollution  control:   the  technology-
based approach,  which  uses nationally  prescribed  effluent  limitations  to  achieve
effluent reductions,  and  the water  quality  based  approach, which  is  used to  set
permit limits based on the water quality problems in  a specific  stream.

     The Agency has made  considerable  progress toward  implementing Best Available
Technology Economically Achievable  guidelines (BAT).   We are now  meeting  all  pro-
posal and  promulgation  dates  set  in an  explicit  court-ordered schedule  and  have
proposed 13 BAT  guidelines and promulgated  11  more  as of December 31,  1982.   To
date, EPA and  the  States  have focused  primarily  on permitting  through  the technol-
ogy-based approach, although water quality  based permitting has been  used  to some
extent. In  accordance  with legislative Intent,  the  Agency will continue  to  issue
permits based  on  BAT toxic pollutant limitations.   Similarly,  the States  and  EPA
are working to bring about  compliance with  the  technology-based limit  of secondary
treatment for municipal treatment  plants.

     Water quality based  controls  are  necessary  in  those cases where technology-
based limits are not  completely successful, by themselves,  in  meeting State  water
quality standards.   The  Agency recognizes  that the  water quality based  approach
must be more  vigorously pursued and will work  with  the States in developing  and
implementing this approach.  The States and EPA will  focus  on  priority waterbodies
within each State to protect and maintain designated uses.

     The Marine Protection,  Research and  Sanctuaries Act authorizes the Agency  to
develop criteria for the ocean disposal  of materials based on a number  of statutory
factors including  environmental consideration  and  the  need to use the  ocean as a
waste disposal medium.  The  Agency is  also  authorized to designate  sites for  .those
materials and  issues permits  for  all nondredged materials.  Although  the  Corps  of
Engineers is responsible  for  issuing permits  for dredged material, EPA must review
those applications  for  consistency  with  Agency-issued  environmental   criteria.
                                     "wq-3

-------
     Within these  two  legislative  authorities the  water program  strategy  is  to
encourage State assumption and maintenance of  water programs  while  focusing on the
following priority areas:

     - Promulgating remaining court-ordered effluent guidelines;

     - Issuing NPDES  permits  in accordance  with  statutory requirements,  insuring
       that these  permits  are  based  on  sound scientific  analysis, are  complied
       with, and are not subject to frequent change;

     - Improving the compliance of  publicly  owned treatment works,  focusing on the
       Agency's municipal compliance strategy;

     - Examining  and  developing  State  programs  for  making   water quality  based
       decisions through ranking  and  updating priority  waterbodies,  analyzing the
       attainability of  standards,  and  conducting  analyses of  total  maximum daily
       loads 1n connection with wasteload allocations;

     - Implementing a sound marine protection program that will coordinate programs
       for ocean dumping,  incineration  at sea, Section  301(h)  marine  waivers, and
       Section 403(c)  ocean discharges;

     - Awarding  construction  grants  that support  State priorities  and that  are
       within the financial capability of the communities served;

     - Responding to spills of oil  and other petroleum products; and

     - Implementing  reforms  in the  dredge   and  fill  program  under  Section  404
       of the Clean Water Act.

Encompassing these  areas  is  the  continuing  goal  of  ensuring  that research  and
development provides timely analysis,  information,  and  analytical  techniques that
are relevant and useful to the water program office and to the States.

Meeting Schedules for Effluent Guidelines

     The Agency  is  meeting the revised court schedule  for  proposing and  promul-
gating effluent  guidelines.   Thirteen  regulations  have  been proposed  and eleven
more have been promulgated.  The remaining guidelines  will  be promulgated by 1984.
The guidelines will  be  used  by  the  Agency  and  the  States  in  developing toxics
limitations for  industrial dischargers.   Activities  in  1984  will  also  include
support of litigation  involving the guidelines that have already  been  issued and
support to Regional and State permit writers  for issuance of  BAT permits.

Issuing NPOES Permits

     The major focus of the NPDES  permit program will  be the  reduction of the back-
loa of  permits  to  be  Issued  by  the  Environmental   Protection Agency.   Primary
emphasis will  be on the Issuance  of  expired  major  Industrial permits,  using BAT
guidelines to  impose  toxic  limitations, and  on  implementation of the  National
Municipal  Policy.  Major municipal  permits will have to  be reissued as a result of
Section 301(h) marine  discharge waivers,, 301(1) extensions,  pretreatment require-
ments, and  revisions  to  the secondary  treatment  standards.   EPA will  continue to
process requests for ocean discharge  waivers and to  process permits resulting from
waiver determinations.  The Agency will  continue to  support the development of new
State programs  for  administration  of   the  NPOES  program and  necessary  program
modifications by States  already having  MPDES  authority.  We  expect two  additional
States will  assume NPDES  program  authority  in  1984,   while  an additional  eight
States will  receive program approval  to modify their  programs to take  on authority
for pretreatment and/or Federal facility permitting.
                                       WQ-4

-------
Promoting Compliance with NPDES Permits

     Major emphasis  will  continue  in 1984  on  improving  the  compliance  rate  of
nunicipal permittees,  concentrating  particularly  where  health  and  water  quality
problems result  from  noncompliance.   Our goal  will  be  to  assure that  Federally
funded treatment facilities are  properly  operated  and maintained and, in  the  case
of noncompliance, that municipalities  take  adequate  steps to  correct  deficiencies
in design  or operations  and  maintenance.   Where significant noncompliance  per-
sists, EPA will  take  administrative  enforcement action  and,  if necessary,  refer
the matter for formal  action by  the Agency's Office of  Legal  and  Enforcement  Coun-
sel (OLEC).

     To support this initiative, we will  make  use  of  performance  audits and  visits
to identify  causes  of noncompliance.   Also, EPA will  maintain a  source  inventory
for the highest priority Federally funded minor  municipal  treatment plants and  for
inspection of Federally  funded municipal  minors.  This information is required  to
help us evaluate the  effectiveness  of the construction grants  and compliance  pro-
grans .

     Resources will   also  be devoted  to maintaining  the  relatively high  rate  of
industrial  compliance  (88%).   Data will  continue to  be  collected  and  processed
on industrial performance,  and  compliance  inspections  will  occur  where  there  is
significant noncompliance.  Persistent  noncompliance  will  be subjected to  admin-
istrative enforcement  action   and  may be  referred to  OLEC  for judicial  action.

     The industrial  wastewater research program  will  provide  support  for  the  MPDES
permit program by providing  quality  assurance  for industrial  effluent monitoring
activities and research on improved analytical  techniques.

Implementing the Water Quality  Based Approach

     The 1984 abatement and control program  will emphasize the  water quality  based
approach to  water  pollution control.   Regions  will  help  States to  update  their
list of priority waterbodies,  conduct use-attainability  analyses,  and review  and
modify as  necessary  water quality  standards.    The water monitoring  program  will
support this approach  by  working with States to improve the  quality of  monitoring
data generated by the States,  local  governments,  and industry.  The program  will
also provide techniques for the  States to use  in conducting  wasteload  allocations,
which are  critical   to  the  establishment  of  appropriate  water quality  based
controls.

     The research program will  refine, develop, and validate protocols  for adapting
water quality criteria to  site-specific  field  applications  and  will  upgrade  and
validate the field models  needed to identify water quality limited stream reaches
and to calculate wasteload allocations.

Implementing a Marine Protection Program

     In 1984, the  ocean  disposal  program will  consist  of  a more  comprehensive,
scientifically supported effort  designed  to  consider  the  ocean as a waste manage-
ment alternative for certain  wastes  at  certain sites.  The  major  focus  of  this
program will  be  to  implement  a coordinated marine  resources  strategy  that  will
identify the relationship between  ocean dumping,  ocean discharge,  incineration  at
sea, and 301(h)  waivers  to  effectively manage  the disposal of  waste  in the ocean.
If appropriate legislation  is  approved by  Congress  in 1983,  the Agency  will  im-
plement a user fee system for disposal of waste at sea.

     The basic objectives  are  1) to  develop an improved  scientific capability  to
predict the  effects  of ocean dumping  of materials; 2) to  review  ocean  disposal  as
a waste management alternative; 3) to manage .an.environmentally sound  incineration-
at-sea program cooperatively with  the Hazardous Waste program  operating  under the
Resource Conservation  and  Recovery Act;  and 4) to establish a  better  scientific
basis for evaluating the range  of sludge disposal options—Including ocean dumping.
                                      WQ-5

-------
     The research program  will  develop and  validate  techniques for  assessing  the
impact of ocean  disposal  of  wastes;  develop monitoring techniques to  evaluate  the
long-term effects of  ocean  disposal;  and evaluate the  trade-offs of  alternative
treatment technologies with  respect to  environmental  effects  of alternative levels
of treatment  in  support of  the  ocean disposal  program.   In addition,  short-term
tests developed  to  assess  health  and environmental   risks  and  effects  will   be
used to assess complex mixtures.

Managing Construction Grants

     EPA activities in the construction  grants program will continue  to  move  away
from direct project management, reflecting the  fact that EPA  will  have fully dele-
gated the program  to  3.6  States by  the end  of 1984.  In  1984,  the  Agency  will,
however, continue to  ensure that  Federal construction  dollars are  appropriately
managed and  that the construction  grants program  meets  its   statutory  responsi-
bilities in both delegated and nondelegated States.

     EPA will  continue   to   ensure  that  limited funds  are  focused  on  priority
projects with the  greatest  water  quality and  health impact;  on  local  financial
capability and  implementation of  least  costly  wastewater treatment  approaches;
on el iminating backlogs in project  completions  and  closeouts;  on effective perfor-
mance of newly completed  treatment  facilities;  on prevention of waste,  fraud,  and
mismanagement; and on effective management of delegated and  nondelegated responsi-
bilities by States,  the Corps of Engineers, and EPA.

     The municipal   wastewater research  program  will focus  on  post-construction
evaluations of innovative and  alternative treatment technologies  for  the construc-
tion grants program.  Related to both the  construction grant  and marine protection
programs, the  research  program  will   focus   on  developing more  effective  sludge
treatment methods to  enhance  the  utilization   of  sludge  for  a  broad  range  of
uses as  well as reducing volumes  of  sludge  expected  from  construction of  new
systems.  Health research  will  continue  to  address the  health  implications  asso-
ciated with land treatment of  wastewater and land  application  of  sludge.  Efforts
in scientific assessment  will  be used  to develop and implement methodologies  for
health hazard/risk assessment evaluations of sludge  disposal  options.

Maintaining Emergency Response Capability

     The envirormental emergency  response program will  continue  to  maintain a  24
hour per day  capability  to  receive notice  of and  respond  to  major  incidents  of
accidental  releases  of  oil  and  other  petroleum  products  (spills   of  hazardous
substances are  covered  under  Superfund).   Removal   actions  will  be directed  by
Regional field personnel  at  120 serious  incidents  where the responsible party  is
unidentifiable, refuses to clean up, or is incapable of providing adequate removal,
and where State  or  local  authorities  lack appropriate expertise or resources.   The
cleanup monitoring program will continue  to  provide incentive  for  adequate removal
by the  responsible  party, as well  as serve  as a mechanism for drawing  State  and
local agencies into directing removal themselves.  The Agency's focus in 1984  will
be on  encouraging  State  and local  governments  to  assume a  greater  share  of  the
responsibility for  responding  to oil  spills.  Federal resources, therefore,  will
be concentrated  on  major actions where State,  local, or  private response  Is  not
feasible..

Reforming the Dredge and Fill Program

     The major effort in 1984 will be to implement program reforms, consistent with
those identified by the  President's Task  Force on  Regulatory  Relief,  to make  the
Section 404 program more effective and  efficient and to review individual  and gener-
al permits,  preapplication consultation,  activities  for 404(c)  actions, and early
planning and  review  for Environmental  Impact  Statements.   Regions will  assist
States with  planning  and  development  of program proposals  for transferring the 404
program.  This  request  will  include  managing  State  program  development grants,
presubmittal consultation,  review  of  submissions,  and   coordination  with  other
agencies.  In  addition,  assistance  and   oversight  will  be provided   for  States
that have assumed the program.
                                       UQ-6

-------
                                   WATER  QUALITY
                                                                         Increase
                                             Budget   Current            Decrease
Program Activities
Effluent Guidelines (cumulative)
Promulgated! • 	 	
Ocean Dumping Permits 	

Step 1 Awards. 	
Step 2 Awards. 	 	
Step 3 and 2+3 Awards 	
Active Construction Grants Projects
Step 3 and Step 2+3 Project
Completions 	
Signed 205(g)- Agreements 	 	
State Program Approvals, National
Pollutant Discharge Elimination
System ( NPDES) 	 	 	 	
Adjudicatory Hearings Settled-
Actual
1982
3
5
38
. 586
. (26)
. (36)
. (524)
8,346
.1,290
46
35
. 74
Estimate
1983
14
16
40
661


( 661 )
5,715
1,250
46
37
76
Estimate
1983
17
20
40
771


(771)
6,446
1,136
49
36
76
Estimate
1984
18
29
55
597

.
(597)
4,764
1,200
49
38
76
1984 vs
1983
+1
+9
+15
-174


(-174)
-1,682
+64
o
+2
0
Permits Issued by EPA:

     Municipal-
       Major	    84
       Minor	   235

     Non-municipal
       Major	    81
       Mi nor	   679
       General.....	     2

Enforcement Actions

     Notices of Violation
     (Administrative Orders).*......   389

     Compliance Inspections.	...1,763

Cl ean Lakes Projects Awarded.	    ,20
Clean Lakes Projects Completed	    30
 51
10?
181
+79
280       274       300       +26

"Is       "26        58       +32
760
2,974
0
40
760
2,275
15
35
673
1,978
0
40
-87
-297
-15
+5
                                     WQ-7

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                               1984 Budget Estimate
                                Table of Contents
WATER QUALITY
    RESEARCH S DEVELOPMENT
       Hater Quality Research..	.,	.,	  VIQ-9
       Municipal Wastewater.	  WQ-21
       Industrial Wastewater..	  WQ-3Q
                                        WQ-8

-------
                                    WATER QUALITY

                                Water  Quality Research


PROGRAM
Scientific Assessment
Salaries 4 Expenses
Research & Development
TOTAL
Technical Information 4
Liaison
Salaries 4 Expenses
Research 4 Development
TOTAL
Monitoring Systems 4
Quality Assurance
Salaries & Expenses
Research 4 Development
TOTAL
Health Effects
Salaries 4 Expenses
Research 4 Development
TOTAL
Environmental Engineering
4 Technology
Salaries & Expenses
TOTAL
Environmental Processes
& Effects
Salaries & Expenses
Research 4 Development
TOTAL
Great Lakes Research
Salaries 4 Expenses
Research 4 Development
TOTAL
ACTUAL
1982
(DOLLARS
$750.1
S832.1
$1 , 582 . 2
$180.8
$21.0
$201.8
32,558.3
$91 0.2
$3,468.5
$982.7
$2,033.2
$3,015.9
-
$7,160.4
$2,645.8
$9,806.2
$905.9
$1,501.5
$2,407.4
BUDGET
ESTIMATE
1983
CURRENT ESTIMATE INCREASE +
ESTIMATE 1984 DECREASE -
1983 1984 VS 1983
IN THOUSANDS)
$541.1
S100.0
$641.1
$230.1
$100.0
$330.1
$2 , 057 . 9
$2,057.9
SI ,.096. 8
$200.0
$1,296.8

$6,217.4
$500.0
$6,717.4

$541.1
$100.0
$641.1-

$2,057.9
$276.2
$2,334.1
$1,096.8
$200.0
$1,296.8
$96.3
S96.3
36,217.4
$1,500.0
37,717.4
$1,000.0
$1,500.0
$2,500.0
$197.5
$100.0
$297.5

$1,887.6
3425.0
$2,312.6
$420.7
3420.7
$225.0
$225.0
S6, 424.1
$2,507.5
$8,931.6

-$343,6
-$343.6

-$170.3
$148.8
-$21. 5
-$676.1
-$200.0
-$876.1
$128.7
$128.7
$206.7
$1,007.5
$1,214.2
-$1,000.0
-$1,500.0
-$2,500.0
TOTAL:
 Salaries 4 Expenses
 Research 4 Development
$12,538.2',  $10,143.3  $11,009.5
 $7,943.8     $900.0   $3,576.2
                 $9,154.9 -$1,854.6
                 $3,032.5   -$543.7
Water Quality Research TOTAL  $20,482.0  $11,043.3  $14,585.7  $12,187.4-$2,398.3
PERMANENT UORKYEARS
Scientific Assessment
      9.5
"5.5
5.5
1.5
-4.0
                                       MQ-9

-------
    WATER QUALITY

Water Quality Research

ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
           1983       1983             1984 VS 1983

Technical Information 4
Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Engineering
4 Technology
Environmental Processes
4 Effects
Great Lakes Research
TOTAL PERMANENT WORK YEARS
TOTAL WORKYEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Engineering
& Technology
Environmental Processes
4 Effects
Great Lakes Research
TOTAL WORKYEARS
(DOLLARS
2.3
44.1
12.2

135.8
3.9
207.8

17.8
3.4
60.6
17.6

179.4
4.8
283.6 '
IN THOUSANDS)
1.5
33.7
13.0

112.6

166.3

13.0
2.2
44.9
19.1

184.0

263.2


33.4
13.0
2.9
112.1
8.0
174.9

13.0

44.6
18.1
2.9
175.0
8.0
261.6


30.7 -2.7
3.0 -10.0
2.9
112.1
-8.0
150.2 -24.7

4.0 -9.0

38.9 -5.7
6.1 -12.0
4.1 1.2
183.5 8.5
-8.0
236.6 -25.0
       WQ-10

-------
                                     WATER QUALITY


                                 Water Quality Research


                                                             Current
                                                Actual        Estimate       Estimate
MygrrQu^uts/Mi1estgnes                        JffiL...       1983             1984

Develop and Standardize
Monitoring and Measurement
Methods to Support Water
Quality Programs.

-  Evaluate the enforcement potential              6/82            4/83            8/84
   of protocols for toxic effluents
   of metals to aquatic biota. (Monitoring)

-  Standardize four fresh-                        6/82
   water bioassays with four
   reference toxicants. (Monitoring)

Provide Quality Assurance to
Support Water Quality Programs.

-  Provide calibration materials                  9/82            9/83            9/84
   water quality monitoring, (Monitoring)

-  Develop reference toxicants using              6/82            6/83            6/84
   microinvertebrates, macroinvertebrates
   and vertebrates. (Monitoring)

Develop the Scientific Data to
Support the Water Quality-Based
Approach to Pollution Control.

-  Methods for the derivation of                  6/82
   site-specific water quality
   criteria. (Env. Processes)

-  Report describing usefulness and               9/83            9/83
   implementation of "regional" use-
   attainability approaches.
   (Env. Processes)

-  Assistance in modifying or determining          9/82            9/83            9/84
   health criteria/standards for site-
   specific situations. (Scientific
   Assessment)

-  Develop guidelines for exposure       4        8/84            8/84            8/84
   to chemical mixtures. (Scientific
   Assessment)

-  Evaluate the use of the minimum data           9/83            9/83
   set concept in the derivation of site-
   specific criteria. (Scientific -
   Assessment)

   Report on the biological  significance         • 9/84            9/84            9/84
   of contaminated sediment, assessment
   methods and use as criteria. (Env.
   Processes)
                                        WQ-11

-------
                                     WATER QUALITY


                                 Water Quality Research


                                                             Current
                                                Actual        Estimate       Estimate
Major Qutj_u_ts/Hj_1_estgnes                         1982         1983             19841-	

-  Report on the feasibility of using a           6/83            6/83
   generic toxicity approach for waste-
   load allocation. (Env. Processes)

-  Provide revision of swimming water            12/84           12/84           12/84
   criteria to consider "clumps" of
   pathogens and resistant bacteria.
   (Health Effects)

-  Provide health effects bioassay                6/86            6/86            6/86
   methods manual for determining
   stream wasteload allocations.
   (Health Effects)

-  Wasteload allocation users manual              9/84            9/84            9/84
   for metals.  (Env. Processes)

Develop the Scientific Data
to Support an Environmentally
Sound Ocean Disposal Program.

-  Technical guidance document on ocean           6/33            6/83
   dumping site characterization.
   (Env. Processes)

-  Hazard assessment protocol for                 9/86            9/86            9/86
   evaluating ocean dumping impacts.
   (Env. Processes)

-  Persistence and fate of pollutants             9/85            9/85            9/85
   in marine food webs. (Env. Processes)

Great Lakes Research

-  Report on algal available phosphorus           4/83            4/83
   in suspended sediments. (Env. Processes)

-  Protocol for field assessment of               4/83            4/83
   watershed exposure, dose and effects.
   (Env. Processes)

-  Evaluations of Site-Specific Guidelines        9/83            9/83
   for three sites in the Great Lakes.
   {Env. Processes)
                                         WQ-12

-------
                                      WATER QUALITY


                                 Water Quality Research
Budget Request
     The Agency requests  a  total  of 312,187,400 and 150.2 permanent workyears  for
1984, a decrease of $2,398,300 and 24.7 permanent workyears from 1983.   Included 1n
this total  are $9,154,900 for Salaries and Expenses and $3,032,500 for  Research  and
Development, with decreases of  $1,854,600  and  $543,700  respectively.   The decrease
occurs mainly  in  the  Great Lakes  research  and  health  effects  program  elements.

Program Description
     Over the  next  several  years,  technology-based  controls  will  largely  be  in
place.  Technology-based  standards,  however,   will   not  achieve  desirable  water
quality in all stream segments.  In these cases, the Clean Water Act (CWA)  provides
for the establishment  of  effluent  limitations  based  on  water  quality.   A  site-
specific criteria approach will be encouraged to reflect local  environmental  condi-
tions.  States may  also  conduct a  use-attainability analysis  to consider  fully
the environmental and  economic  factors  affecting  the attainment  of their  water
quality standards.  The Environmental Protection Agency's  research and development
program will  provide  the  scientific and  technical   base  to  help States  develop
site-specific standards to  control   pollutants  and  will conduct  use-attainability
analyses.

     There is increasing interest in making safe use of the oceans for the disposal
of wastes.   This  approach requires  a  capability to  predict the  impacts of  ocean
disposal,  evaluate alternative disposal  options, select appropriate disposal  sites
for a given waste, and  detect disposal problems  in order to make rational, scientif-
ically supported  regulatory  decisions.    The ocean  disposal   research program  is
structured to provide critical information  for  the development  of a responsive and
scientifically valid ocean disposal  waste management program.

     The following objectives support these goals:

     Objective 1.  Develop and  Stamtordlze  Monitpring  and Measurement Methods to
Support Water Quarity 'i'rggraMs.This activity  provides  tfieStates  and  Toca'Titfe's
wi tn as si stance and a  scientific and technical  data  base  with which  to  carry out
effective  site-specific monitoring  surveys in  fresh  and  marine waters.  This re-
search develops and standardizes  cost-effective monitoring  and measurement methods
needed for identifying toxic pollution problems, for concurrently evaluating stream
flow and effluent variabilities  and  their  combined  effects  on  achieving designated
water uses, and for evaluating compliance  with  ambient water quality standards and
permit requirements.

     Objective 2.^  Prgvidf  Quali ty  Assurance  to   Support Watfr^yal ity Programs.
This researchide^iopT'and^stahdal-dizw'qualTty''assurance mefnotfs.ItTfso^provTdes
continuing basic quality control materials and guidance.  Additionally, the adequacy
of analytical procedures are determined  to assure the quality of the gathered data.

     Objective 3.  Develop the Scientific DatatoSupport jthe   Water Quality-Based
Approach to Pollution Control.  The-"objectivesTof''this research7"are to provide the
necessary  scientifie' tools',  such  as site-specific protocols,  waste!oad  allocation
models, short-term bioassays,  and hazard  assessments,  to  enable  the program  office
and States  to implement  the  water  quality-based   approach  to pollution  control.
                                         WQ-13

-------
     Objective 4.  Develop the Scientific Data to Support an  EnvironmentallySound
Ocean Disposal Program.  This program  area  develops  and  val1 dates protocols needed
by EPA  for  predicting  •impacts  from  ocean disposal,  making  hazard  assessments,
selecting dumpsites,  and  developing  blomonitoring techniques  for estimating  and
documenting  ecological impacts from the discharge  of  wastes  into  the  ocean and  for
identifying  acceptable  disposal  practices.   The  generated  data   will  be  used  to
regulate ocean disposal practices.

SCIEMTIFICASSESSMENT

1984 Program Request

     The Agency  requests  a  total  of $297,500 and  1.5  permanent workyears for this
program, of which $197,500 is for Salaries and Expenses and $100,000 is for Research
and Development.  This decrease of $343,600" in the Salaries  and Expenses appropri-
ation reflects  a lower need for risk  assessment support  for  the development  of
criteria for the consent decree pollutants since major  research efforts  1n  this
area have been completed.

     Develop the Scientific Data to Support  the  Water Quaility-BasedApproach   to
Po 11 u tlon ControTt  Activ1ti₯s In 'this research  effort" wiTT  revise"aria  finalfze
guidelTnes for  assessing  risk  of  human  exposure to  mixtures  of toxic  chemicals
and will evaluate  site-specific  health hazards as required  by  the States and  EPA.
These activities  will  Include  health  assessments and  minimum  criteria  reports.

1983 Program

     In 1983, the Agency  is  allocating a  total  of $641,100 and  5.5 permanent work-
years to this program, of which $541,100  Is under the Salaries  and Expenses appro-
priation and $100,000 1s for extramural purposes under the Research and Development
appropriation.

     Develop  the  Scientific  Data to Supportthe! Water'Quality-Based  Approach to
Pollution Control.  SuideTlnes  for  evaluating  avail able  health data  associated'
with human exposure  to  complex mixtures  of chemicals are being  developed.  Mini-
criteria (I.e.,  maximum  safe concentrations  as  indicated by  a  minimum  data  set)
for preliminary  hazard  assessments  are being  developed  in  Heu  of full  criteria.
Updates of   existing  guidelines  and  methodology  are  being  Initiated  In  1983.

1983 E xp 1 anartl on of Changes f rom Bu dget Es tl mate

     There is no change from the Budget Estimate.

1982 AccompllshTOnts

     In 1982, the Agency obligated  a total of $1,582,200 for this  program, of which
$750,100 was  under  the Salaries and Expenses appropriation  and  $832,100  was  for
extramural  purposes under the Research and Development appropriation,

     Develop theScientific  Data   to  Support the Water Quality-Based Approach to
Pollution ContfopEfforts were initiated  to  expand  exlstirtg guidelines and meth-
₯doToTgTes to Tnclude protocols for  estimating risk to human health from exposure to
complex mixtures  of  chemicals.  Four  workshops  were  conducted  to address Issues
relevant to  risk assessment methodology,  i.e.,  threshold  vs.  non-threshold  car-
cinogens.  Draft Interim criteria summary statements  were developed  for 12 noncori-
ventlonal pollutants  for  use  in  updating  the  Water  Quality Criteria.   A  report
was prepared  relating water quality  factors  to  toxldty  or  b1oavailab111ty  of
pollutants to man.
                                          WQ-14

-------
TECHNICAL INFORMATION AND LIAISON

1982_Accompl jshments

     In 1982, the  Agency  obligated a total of $201,800  for this  program,  of which
S180.800 was  under the  Salaries  and  Expenses  appropriation and  $21,000  was  for
extramural purposes under the  Research  an.d Development appropriation,   This  activ-
ity, which supports research  programs  across  all media, was  consolidated  into the
Intermedia program  in  1983.  Thus,  the P rogram D es crip ti on, 1984 Program Request,
1983, Program, and 1982 Accomplishments narrative sections appear there.  :  ::

MONITORING SYSTEMSAND QUALITY ASSURANCE

1984 Program Request

     The Agency  requests  a  total  of S2,312,600  and  30.7  permanent workyears  for
this program, of  which  $1,887,600  is  for  Salaries and Expenses  and $425,000  is for
Research and Development.   This reflects  a decrease  of  $170,300 and  increase of
$148,800 respectively.  The decrease  reflects  a decision  to proceed more  slowly
on the  standardization  and  field  evaluation of  innovative,  long-term  bioassay and
stream survey protocols.  The increase will  provide  additional support  for standard-
ization of analyses of priority  pollutants.

     Develop  and  Standardize Monitoring and Measurement Methods to Support  Water
Qua!i ty progi ramsT  The  Agency  needs to  improve  the  scientific  and  technical  data
base necessary to  carry out effective  site-specific  intensive  monitoring  surveys.
Additionally, the  Agency  needs  to further  validate  chemical  methods capable  of
monitoring toxicologically  significant  pollution  concentrations  in ambient waters.
A toxicity monitoring protocol will be developed to assist the allocation of waste-
loads among dischargers to  a particular water body.

     Research on  chemical  measurement  methods  will  focus  on the development and
standardization of  measurement  and  quality assurance  methods  for  priority toxic
pollutants, especially  in  areas for  which no  standard methods   now  exist, viz.,
bottom sediments,  fish  tissue,  and marine water.  EPA will  work  on  increasing the
sensitivity of methods for  toxic metals in water to permit measurements of specific
forms of metals  at concentrations  down to  the laboratory derived criteria values.
Research on biological  monitoring methods will  emphasize:  development  and standard-
dilation of methods for screening high concentrations of toxic pollutants in ambient
waters; development of  quality  assurance  procedures  to  analyze  chronic  and acute
toxicological  effects;  and  standardization of  microbial  and  viral   sampling  and
analysis methods.   Research on  physical  measurement methods  will concentrate  on
documenting the  validity,   accuracy,  and   precision  of  sampling  and  flow-sensing
equipment.

     Prpvi de Qua 1 i ty As su ranee to S u p port Mate r Qu a1ityP rograms.  Quality  control
calibrationi ma tier ials will  continue  to be provided  In support  of fresh  and marine
water quality monitoring.   Standardization of virus  sample  preservation  and assay
procedures will  continue.   Flow  measurement will  be evaluated  in  field  trials.  A
computer software  system  will  be  expanded  to  cover new sample  types  that shortly
will be ready  for  distribution  for  quality  control,  calibration,  and/or audits.

1983 Program                              ;

     In 1983,  the  Agency is  allocating a  total  of $2,334,100  and  33,4 permanent
workyears to this  program,  of  which $2,057,900 is  under the  Salaries  and  Expenses
appropriation and  $276,200   is  for  extramural  purposes  under  the   Research  and
Development appropriation.
                                          WQ-15

-------
     Develop and Stanclardfze Hom'torlng and Measurement  Methods  to  Support Mater
Qual 1 ty Progranjsl  RapT3  and  inexpensive  bacterial   mutagerilcTty/carcinogenlcity
tests are  oeing  developed and  standardized.   Work will  continue to  evaluate  and
improve existing effluent toxicity  tests.   Extraction  and clean  up  procedures  for
organic priority pollutants are being developed for contaminated  sediments.   Field
measurement techniques, design procedures, and strategies are being refined through
site-specific surveys.  The design of the national  water quality monitoring network
is being evaluated to determine the relationship between a fixed station network to
intensive site surveys.

     P rovi de Quajity Assurance to Support Water Qual i tjf_ Prog rams.   Calibration mat-
er i .a ll"a?irT>ITnl:fTuriiT"sT^                                      scale  implementation
project using on-site  quality assurance evaluations is  being made as  part  of  the
mandatory quality assurance  program.   Analytical  protocols are being  standardized
for: dredged  material,  chemical  speciation,   sediment  sampling  and  site-specific
surveys.  An enzyme  technique  is  being evaluated for use  in  monitoring freshwater
pollution problems caused  by metals, pesticides,  and  other  organic  contaminants.

1983 Explanation of Changes from Budget Estiniajte

     The net increase of +$276,200 results from the following action:

     -Congressional  Action.  (+$276,200)   Congress added  +$8,526,200  to  the  Re-
search "aria  Devel opineht appr opr 1 ation  for  priority  activities  at the  discretion
of the  Agency.   This  specific increase  supports  the  Agency's  quality  assurance
initiative in relation to sampling and survey design.

1982 Accomplishments

     In 1982, the Agency obligated a total of $3,468,500 for this program,  of which
52,558,300 was under the  Salaries  and Expenses appropriation and  $910,200  was  for
extramural purposes under the Research and Development appropriation.

     Develop and Standardize Monitoring and  Measurement  Methods  to Support Mater
Quality ^ograms.  In 1982,  reference methods  were pub lisded  for chlorinated  or-
ganlcs as "a i  etas s ,  and four freshwater biological  indicators of  toxicity.   Fresh-
water monitoring  methods  for  pesticides  and  other  organic  chemicals have  been
adapted for  seawater use.  A  method  for  recovering  virus  from  sludges has  been
published and a  method for  enumerating  virus attached to waterborne  material  has
been developed.   Aerial  imagery for  spill  prevention  planning and  impact assess-
ment of wetlands damage, land use and water quality status along the Alaskan pipline
was developed for use in enforcement support and emergency response.
     P rovjde  Qua! i ty  Assurance  to  Support Water Qug.H ty Programs.   Performance
evaluations of landilibry Duality assurance I programs f were completed at approximately
400 laboratories.  New  calibration samples  were developed for  a variety  of  sub-
stances.  The program continued to furnish quality  control  samples  of organic com-
pounds for 95  of the 109  Consent Decree  organic  pollutants.   Over  9000  of these
samples were distributed during the year.

HEALTH EFFECTS
1984 Program Request

     The Agency requests  a  total  of $420,700 and 3.0  permanent workyears for this
program, all of  which Is for  Salaries  and Expenses.  This reflects  a  decrease of
$576,100 in the Salaries  and Expenses appropriation and a  decrease of  $200,000 In
the Research and Development appropriation.   This decrease  reflects the completion
of major health research efforts that supported  the  development of the water quality
criteria documents pertaining  to  the Consent Decree priority pollutants.   Some of
the resources In this program have been  shifted  to the Drinking Water  health effects
research program to support the Office of Water's efforts to consolidate  the consid-
eration of water-related  issues under the direction of the Drinking  Water office.
                                         WQ-16

-------
     Oevel op the Scientific,Data to  Support  the  Water Quality-Based  Approach to
PolluTTon Control.  the "Agency has	identified specific  sites7 where high concentra-
tionsof  wa te rbo r ne  pollutants  are of particular concern.   Investigators  will  use
existing short-term health  tests  for carcinogenicity,  mutagenicity,  and  reproduc-
tive effects  to determine  whether  or not  a  site  receiving  a  large number  of
chemical contaminants is  a  public  health  risk.   Research will  focus  on developing
and evaluating test methods for toxicity in complex mixtures.

198.3 Program

     In 1983,  the  Agency is  allocating  a total  of 51,296,800  and  13.0  permanent
workyears to this  program,  of which $1,096,800 is  under the  Salaries and  Expenses
appropriation and  5200,000  is   for  extramural   purposes  under  the  Research  and
Development appropriation.

     Develop the Scientific Data to  Support  the  Water  Quality-Based Approach to
Po 11 utnon Control.  A goal  of the  Clean  Water Act is to develop water quality ade-
quate	for	recreation.   The  existing  recreational  water quality  criteria  are based
on the  limited  data  available in 1968.  To support the review  and the  revision of
the existing recreational  water quality criteria,  a  freshwater recreational water
quality criteria document is  being developed  based  on dose-response data  for human
infectious disease.   The  research on  toxicological  and dose-response  data  needed
for implementation of Section 304 of the CWA is being completed for eight compounds.

1983 Explanation of Changes fromBudget Estimate

     There is no change from the Budget Estimate.

1982 Accomplishments

     In 1982, the Agency obligated a total of $3,015,900 for this program,  of which
5982,700 was under the  Salaries and Expenses appropriation  and  $2,033,200 was for
extramural purposes under the Research and Develop appropriation.

     Develop the Scientific Data to ^Support n the  Water < Quality-Based.ir.Ap_proac-h to
Pollutioni ContrpTr Res64>c'h~ytud^₯sJof"t^"repr^dtK:'trve' effects of se'TectSd 'org'ariTc
poi 1 utari'ts fiaVe ""Wen completed.   Studies on microbial sampling variables and recre-
ational water quality standards have been published.

ENVIRONMENTAL ENGINEERING AND TECHNOLOGY

1984 Program Request

     The Agency  requests  a  total  of 3225,000 and 2.9 permanent workyears  for this
program, all of  which  is  for Salaries and Expenses.   This  reflects  an increase of
$128,700*  This  increase  results  from  Increased  emphasis  on ocean disposal  related
research.

     Develop the Scienti fic Data to Support an Envi ronmentany'Sound Ocean Pi sposal
Program.  This in-house research program'Wll correlate  sludgeT'lreatSent levels with
environmental quality  for  use   in  determining  appropriate  treatment levels  for
sludge prior to  ocean  dumping  as  well as  treatment levels  for wastes discharged
through ocean outfalls.

1983Program                                                                   , •

     In 1983, the  Agency  is allocating a total  of  $96,300  and  2.9 permanent work-
years to this program, all of which is under the  Salaries and Expenses appropriation.

     Develop the Sc|enti f j c Data to Support an !_ny,1J^>Pj?j?!rt.a 11 y Sound Ocean 01 sposal
Prpgraim.	' stutfies	of technology  issues related to>"• ocean 'disposal"aire'"6eTh9 '(nitiated.
ErapMsTs is being  given to sludge characterization and correlating  the levels of
sludge treatment to environmental impacts in the ocean.
                                        WQ-17

-------
1983 Expl anatjon of Changes from Budget Estimate

     The net increase of +596,300 results from the following action:

     -Congressional Action.  (-(-$96,300)   This  increase   Includes   +96,300  of  the
$10,5 rail 11 on Salaries ~ and  Expenses  add-on which supports the  480  additional  per-
manent full-time workyears provided to the Agency.

1 982 Ace omp 1 i shmen ts

     In 1982, the Agency did not obligate any resources  for this  program for research
related to the ocean disposal  of wastes.

ENVIRONMENTAL PROCESSES AMD EFFECTS

1984 Program Request

     The Agency  requests  a total  of  $8,931,600 and 1.12.1 permanent  workyears  for
this program, of which 56,424,100 1s  for Salaries and Expenses  and  $2,507,500 1s
for Research and Development.  This reflects  increases of $206,700  and $1,007,500,
respectively.  These  Increases  result  from  increased  efforts  to  support a  water
 3uali ty-based regulatory  approach  and  to  support  an  environmentally sound  ocean
 isposal program.
     Develop the Scientific : Data to  Support  the ...... Water  .Qu8]J..^B_a.K_d Appj^oa_ch to
Pollution Control,  rh e Agency  fs ' mo vl ng  tbwa rd ' i mplemeh ta tTon of a  si te-spec : 1 f f c
approach for States  to define water  quality  standards.  Under this  approach, the
States will address  the  need  for  site-specific  water  quality  criteria  and  will
translate water  quality  standards  into  allowable  loads for  dischargers  1n  some
Stream segments.  Research will  be undertaken to develop, test and transfer proce-
dures to States to determine site-specific criteria.  Newly developed site-specific
criteria guidelines will  be  evaluated  ami  refined in  conjunction  with developing
more precise wasteload  allocation  models.   T.hese models will  focus on  toxic chem-
icals and transfer of pollutants between sediments and the water column.  Addition-
ally, research  will  concentrate  on developing a  generic protocol  for allocating
wasteload toxiclty and  continue to  provide  support  to the Center  for  Water Quality
Modeling.
     Develop the Scientific PjJI to Support an Environmentally Sound Ocean Disposal
          The                                                           '
Program!  The  Agency's  ocean research  disposal  program has two  components,  ocean"
^Jumping and  ocean  outfall discharges.  The  ocean dumping  research  component will
provide scientifically  sound  criteria  for the determination of unreasonable 'degra-
dation and  Irreparable  harm  to  potential  dumping  sites.   Protocols for the charac-
terization of  wastes  proposed for ocean dumping  will  be  developed.   Research will
also develop  hazard  assessment  protocols  to permit  a better  evaluation of  the
Impacts of  ocean  dumping.   These  will  Include:   procedures  for  estimating  the
severity of  ecological  changes  and  procedures for  determining the  transport  and
fate of ocean  dumped wastes.   Other  research efforts will  include  development of
biological procedures to  monitor  dumpsltes  for long-term  effects and evaluation of
procedures to be used In  characterizing and designating dumpsltes.

     The ocean outfall  discharge  research'component  will  provide assistance to the
Office of  Water  in  the  review  of applications  and  monitoring  information  under
Section 301(h)  of  CWA   for   modifications  to  the  mandatory   secondary  treatment
requirement for  ocean discharges of municipal  wastes.  Specific  research efforts
will include:  developing  techniques for characterizing sediment conditions, assess-
ing ecological Impacts  near  outfalls  for  setting permit conditions, and developing
protocols for  characterizing the movement  and  persistence  of  pollutants common
to ocean outfalls.   Research  will also develop Information  for  use  1n determining
monitoring requirements  and will  assess the  significance of changes 1n the marine
environment.
                                         .WQ-18

-------
1983 Program

     In 1983, the  Agency is  allocating  a total  of $7,717,400  and  112.1  permanent
workyears to  this  program,  of which $6,217,400 is under-the  Salaries  and Expenses
appropriation and  51,500,000 is  for  extramural  purposes  under  the Research  and
Development appropriation.

     Develop the Scientific Data to  Support  the  Water  Quality-Based Approach to
Pollution Control.  The  development  of  protocols  fpr  determining  the  nature  of
chemical pollutants and their impact on aquatic ecosystems under different environ-
mental conditions  is  continuing.   Bioassessment methods  for  determining biological
conditions of water  bodies  are  also  being developed to facilitate establishment of
use-attainability assessment procedures.   Revised  aquatic  criteria  for ammonia and
chlorine are being prepared.

     The mathematical models that have been developed  for identifying water quality
limited stream  segments  and for making waste!oad  allocations  of  most conventional
pollutants are being field validated.  Existing models for making  wasteload alloca-
tions are being expanded  to  address  toxic  pollutants both in water and in sediments.
Results from  this  research  effort will allow the  prediction  of environmental  con-
centrations of  pollutants  resulting  from  alternative  levels of  toxic  control.
The development  of bioassay methods  for  quantifying  efficiency of  toxics  removal
of industrial  treatment  processes are being  conducted  at pilot-scale  facilities.
Additionally, bioassays  are being evaluated  for  use  in measuring ttie  toxicity  of
complex mixtures of pollutants.

     Develop the Scientific Dafra to Support an Environmentally Sound Ocean Disposal
ProgranuTechniques for measuring the impacts of ocean disposed materials on marine
organisms are  being  refined.   Techniques  for estimating  the impact  of  dredged
material dumped  in the ocean are being  refined  and   field  validated.   Biological
techniques for monitoring  long-term  impacts on dumpsites  are  being  developed  and
validated.  This effort  is  being  coordinated  with the National Oceanic and Atmos-
pheric Administration and the Corps of Engineers.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$1,000,000 results from the following action:

     -Congressional Action.  (+$1,000,000)  Congress  added +$8,526,200 to  the  Re-
search andDevelopment appropriation  for  priority  activities at  the discretion
of the  Agency.   A  specific  increase  of +$500,000  supports  the verification  of
Section 3Ql(h)  ocean discharge  Impact prediction  techniques  and  an  increase  of
+$500,000 supports ocean dumping hazard assessment protocols.

1982 Accomplishments

     In 1982, the Agency obligated a total of $9,806,200 for this  program, of which
$7,160,400 was under the Salaries and Expenses appropriation  and $2,645,800 was for
extramural purposes under the Research and Development appropriation.

     Develop the Scientific Data to  Support  the  Water  Quality-Based Approach to
Poll ution Control JThe  draft methodology; guidelines  for  the  derivation  of  site-
spec 1 fie water	qua 1 ity criteria were  completed as was  the  water  quality criteria
document for dissolved oxygen.  An updated users manual for the  basin scale analysis
techniques to address  water quality limited reaches  was completed.  A report  was
also completed on the application and evaluation of water quality model  sets for the
analysis of best management practices, land runoffs, and instream and estuary anal-
ysis.

     Develop the Scientific Data toSupport anEnvironmental1y SoundOcean Disposal
Program.  An oceandumping research  program was initiated.Guidelinesfbr'Triterpre-
ting results  of  bioacumulation  studies  of pollutants from  dredged  material  were
completed.  This helped to resolve an issue involving  the ocean dumping of contami-
nated dredged material in  the New York Bight.  A  benthic  bioassay  procedure which
can be used to evaluate the impact of ocean disposal  was field validated.  A 301(h)
                                         WQ-19

-------
 technical support document  was  revised  to make it easier  for  small  communities to
 complete the technical/scientific requirements of a 301(h)  application.

 GREAT LAKES RESEARCH

 1984 Program Request

     EPA believes  that although  earmarked  funding  for the  Great Lakes  research
 program is not  being  requested,  the Agency will provide adequate  research  support
 to the International Great  Lakes Agreement with Canada.  We will continue to main-
 tain our  Great Lakes  National  Program  Office in Region  V and provide  technical
 assistance to the Great Lakes States,  Region V and the International  Joint  Commis-
 sion in the areas of  model  predictions,  wasteload  allocation,  ecosystem responses,
 etc., utilizing current knowledge,  expertise,  and  models.   We feel that  it  is  not
 necessary to maintain  a  separate and distinct Great Lakes research  program since
 we can integrate any  needs  associated with the Great  Lakes into the  overall  envi-
 ronmental research  program.   Such  overall  research which  would be  applicable  to
 the Great Lakes includes:  the  development and verification of site-specific water
 quality criteria;   the  establishment  of  use-attainability assessment  procedures;
 and the  development and  field  validation of  wasteload  allocation models.    It  is
 important that  our  Agency develop  information and solutions  to national  problems
 that can  be  transferred  for application in the local  area.   Moreover,  since  the
 Agency has conducted  many  comprehensive  studies concerning the  pollution problems
 1n the Great Lakes, the  emphasis will  be on  utilizing the data in  these  studies
 to implement pollution abatement measures.  For these reasons, the  Agency  is  not
 allocating any  funds  in 1984  for  its  research facility  in  Grosse  He, Michigan
 and Is planning to close the facility at the end of 1983.

 1983 .Program

     In 1983,  the  Agency  is  allocating  a  total  of  $2,500,000 and  8.0  permanent
 workyears to this program,  of  which $1,000,000 is under the Salaries and Expenses
 appropriation and  $1,500,000  Is  for extramural  purposes   under the  Research  and
 Development appropriation.

     Research in site-specific  water quality  criteria,  eutrophlcation, and  ecolo-
 gical assessment is being conducted and  technical  support  is  being provided  to  the
 International  Joint Commission  and  U.S./Canada Water  Quality  Board  for  the  Great
 Lakes.  An intensive field study of a watershed  of the Great  Lakes is being conducted
 to determine exposure, dose and  effects  on environmental populations  by evaluating
 exposure potential, exposure experience,  critical  dose,  and observed  effects based
 on biological  epidemiology.

 1983 Explanation of Changes from Budget Estimate

     The net increase of +$2,500,000 results from the following action:

     -Congressional	Action,.  (+$2,500,000)  The Congressional  add-on to  this  activ-
 ity of +$1,QOO,000'to  the"Salaries  and  Expenses appropriation  and  +51,500,000  to
 the Research and Development appropriation  was to retain the  laboratory  at  Grosse
 He, Michigan.

 1982 Accompli shments

     In 1982,  the  Agency obligated a total of $2,407,400 for this program, of which
 $905,900 was under  the Salaries  and Expenses  appropriation and  $1,501,500 was  for
extramural  purposes under the  Research and Development appropriation.

     A report on the  significance  and amounts of PCB's  and other  persistent halo-
 genated hydrocarbons  that  enter Lake  Huron  from  precipitation   was   completed.
 Analysis of data from  Saglnaw Bay  was completed  in  which model  predictions were
 compared with  actual  water quality  improvements that  resulted  from  reductions  in
 phosphorus loading.   In  addition,  a  report  on a  guidance document  for  wasteload
 allocation methodologies for rivers was completed.
                                        WQ-20

-------
                                    WATER QUALITY

                                 Municipal  Wastewater
                                ACTUAL
                                 1982
           BUDGET
           E.ST IMATE
             1383
          CURRENT
          ESTIMATE
            1983
         ESTIMATE
           1984
        INCREASE  +• '
        DECREASE  -
       1984 VS  1983
                                (DOLLARS IN THOUSANDS)
PROGRAM
Scientific Assessment
 Salaries & Expenses
                       TOTAL
Technical Information &
Liaison
 Salaries 4 Expenses
 Research 8 Development
                       TOTAL
Monitoring Systems &
Qual ity Assurance
 Research & Development
                       TOTAL
Health Effects  •
 Salaries & Expenses
 Research & Development
                       TOTAL

Environmental  Engineering
& Technology
 Salaries & Expenses
 Research & Development
                       TOTAL

TOTAL:
 Salaries & Expenses
 Research & Development
   S296.6
    $39,7
   5336.3
    $40.0
    $40.0
   $783.2
 $2,584.0
 $3,367.2
 $4,890.5
511,602.8
$16,493.3
 55,970.3
$14,266.5
  $239.1
  $280.0
  $519.1
$1,018.8     $959.0
$1,232.9   $1,232.9
$2,251.7   $2,191.9
$4,256.9
$4,604.1
$8,861.0
$5,514.8
$6,117.0
$4,256.9
$4,604.1
$8,861.0
$5,215.9
$5,837.0
                                     $83.7
                                     .583.7
                                   $83.7
                                   $83.7
           $1,006.9     $47.9
           $1,062.9   -$170.0
           $2,069.8   -$122.1
$1,324.3 -$2,932.6
$1,784.2 -52,819.9
53,108.5 -$5,752.5
$2,414.9 -52,801.0
$2,847.1 -52,989.9
Municipal Wastewater   TOTAL  $20,236.8  $11,631.8  511,052.9   $5,262.0 -$5,790.9
PERMANENT WORK YEARS
Scientific Assessment
                                       1.0
                                     1.0
                                      WQ-21

-------
                                    WATER QUALITY
                                 Municipal  Wastewater
                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984  VS  1983

Technical Information &
Liaison
Health Effects
Environmental Engineering
(DOLLARS U
5.2
15.4
96.8
i THOUSANDS:
3.2
15.3
65.9
)

14.3 14.3
65.3 24.2 -41.1
& Technology
TOTAL PERMANENT WORKYEARS
117.4
84.4
79.6
39.5     -40.1
TOTAL WORKYEARS
Scientific Assessment                                                2.0       2.0
Technical Information &             7.4        4.8
Liaison
Health Effects '                    20.7       23.7       22.7       21.7      -1.0
Environmental  Engineering         111.6       78.1       77.5       27.1     -50.4
& Technology
TOTAL WORKYEARS                   139.7      106.6      100.2       50.8     -49.4
                                      'WQ-22

-------
                                   WATER QUALITY


                                Municipal Hastewater


                                                            Current
                                                Actual      Estimate      Estimate
Haior_^0utputs/H11_es:tgnes                         1982         1983          1984

Evaluate and Assess Innovative and
Alternative Technologies to Improve
the Efficiency, Reliability and
Effectiveness of Municipal
Wastewater Treatment Systems.

-  Assessment Reports of Emerging technologies
   processes.  (Env. Tech.)                      10/82       9/83         7/84

-  Conduct post construction evaluation of
   I/A projects and publish reports for
   feedback to States, municipalities and
   consultants.  (Env. Tech.)                     9/83       9/84         9/85

-  Report on design methods to correct poor
   design practices, and Improve cost and
   energy savings.  (Env, Tech.)                  6/84

-  Process Design Manual on Wastewater
   Disinfection. (Env. Tech.).                    9/84       9/84

-  Process Design Manual for Wastewater
   Stabilization Ponds. (Env. Tech.).             6/83

-  Handbook for cost effective treatment
   and disposal of septage. (Env. Tech.).         9/83       9/83

-  Evaluation of Sewer Rehabilitation
   Techniques,  (Env. Tech.).                                 6/84         6/84

-  Provide appraisal document on health
   aspects of toxic chemicals in land
   treatment of wastewater. (Health Effects)      7/84       7/84         7/84

-  Demonstration of an airborne real time
   television monitor for spill monitoring.
   (Monitoring)                                   9/83

Evaluate and Assess Improved Treatment,
Utilization and Disposal Methods for
Management of Municipal Sludge.

-  Design Manual  Land Application of
   Sludge. (Env.  Tech.).                          9/83

-  Design Guidelines for Sludge Treatment
   Processes.  (Env. Tech.)                       6/84

-  Provide conference proceedings paper
   on health appraisal  of sludge applica-
   tion.   (Health Effects)                        2/83

-  Assess human health hazard/risk assess-
   ment methodology and guidelines. (Sci. Assess.)                        6/85
                                        WQ-23

-------
                                   WATER QUALITY


                                Municipal Wastewater
Budget Request
     The Agency  requests  a total  of $5,262,000  and  39.5 permanent  workyears  for
1984, a decrease  of $5,790,900 and  40.1  permanent workyears  from  1983.   Included
in this total  is  $2,414,900  for Salaries and  Expenses  and  $2,847,100  for Research
and Development,  with  decreases  of $2,801,000  and $2,989,900  respectively.   The
decrease occurs  mainly in  the  environmental  engineering  and technology  program
element.  In addition,  the  decrease reflects the  transfer  of  $917,600  in explora-
tory research funds to the Intermedia program.

Program Descrl pti on

     The Clean Water Act  (CHA),  as amended in  1977  and particularly in 1981, pro-
vides new incentives  to municipalities  for  using  Innovative  or alternative (I/A)
technologies in  the construction  of  wastewater  treatment  plants.  Research  can
provide information on  the capital cost, energy  efficiency  and performance relia-
bility of emerging innovative  treatment processes.   The  requested documentation
by the  States  of  the  benefits and  costs  of operational,  innovative construction
grant projects  Is  a significant  part of  this research  program and  supports  the
water quality-based approach  to the  standards  setting  and permits  issuance  pro-
cesses.  The following objectives support these goals:

     Qbjecti ve 1 .  Evaluate  and  Assess  Innovative and Alternative (I/A) Technol-
                  '  e  lEfft                                          of  Mun1cjp.al
                                                    '  ........    "             "''"
                     ^           n i order to  •mprove  te ........ cost efectiveness' "'a'mrper-
formance of mum cl pal  treatment plants built  by the construction  grants program,
the primary objective  of  the  I/A technology research program Is to develop a tech-
nology and health effects data base for direct assistance to States, municipalities
and Environmental  Protection Agency  (EPA)  Regions  In applying  I/A  technologies to
solve their water quality  management problems.   Currently,  all  major technological
developments are carried  out  as cooperative efforts with the Industrial, municipal
or university sectors  wherein  we rely on  industry t;o do  the development work while
EPA conducts evaluations to determine applicability to Agency programs.

     Objecti ye 2 .   Eva! uate  and 1  Assess  Improved Treatment . U1 ti 1 1 ;ati on and Pi s-
posal Methods for the  Management of MunicipaT SI uflp.  TRe  levels  of  wastewater
treatment required by  the  Clean Water Act result in large amounts,  about 8 million
dry tons/year,  of  sludge to be disposed  of In  an economical  and  -environmentally
safe manner.  Research under  this  objective provides the  support  for developing
the Agency's  sludge  policies,  guidelines  and  regulations  under  the  mandates  of
both the  Clean  Water  Act  and  the Resource  Conservation  and Recovery  Act (RCRA).
The objective Is to  provide the engineering and  health  effects Information needed
by the States and municipalities for the effective treatment,  use  and disposal  of
sludges.  The research emphasizes minimizing risk and environmental  impacts, energy
use and costs associated with sludge management.

SCIENTIFIC ASSESSMENT
1984 Program Request

     The Agency requests  a  total  of $83,700  and 1.0  permanent workyears  for this
program, all of which  1s  for the  Salaries and Expenses appropriation.  This is the
first year for which the Agency is requesting funding for this area.
                                         WQ-24

-------
      Evaluate and Assess Improved Treatment, Utilization and Disposal Methods  for
the  Management  of MunicipaT  Sludge.Methodology .and  guidelines  For  conducting
health hUzard "arid  nsk assessment eValuations  of  sludge disposal  options  will be
developed.  An assessment  of the  potential  health  hazards  associated with selected
sludge management options will  be initiated.
1983 Program
     In 1983, the Agency did not allocate resources to this program.
1983 Explanation of Changes from Budget Estimate
     There is no change from the Budget Estimate.
1982 Program
     In 1982, the Agency did not obligate resources for this program.
TECHNICAL INFORMATION AND.LIASON
1982 Accomplishments
     In 1982, the Agency  obligated  a total   of  $336,300  for this program, of which
$296,600 was  under  the  Salaries  and  Expenses  appropriation  and $39,700  was  for
extramural  purposes  under  the  Research  and  Development  appropriation.   This
activity, which  supports  research  programs  across  all   media,  was  consolidated
into the  Intermedia  program in 1983.  Thus,  the Program Description, 1984 Program
Request, 1983 P rogram,  and 1982 __Accomp1f s hinents narrative  sections  appear there.
MONITORING SYSTEMS AND QUALITY  ASSURANCE
1984 Program Request
     No resources are requested for 1984.
1983 Program
     In 1983, the Agency did not allocate resources to this program.
1983 Explanation of Changes ^JMI_,Bjjdg_et^E_st1niat6
     There is no change from the Budget Estimate.
j 982 Aceompl i shments
     In 1982, the  Agency  obligated  a total  of $40,000 for this  program,  all of
which was for extramural purposes under the Research and Development appropriation.
     Demonstrate Applications jfjjpnitoring  Technol ojy  f <3r_Spill  Honi'tgring.  A
television camera was adapted for airborne use fn"tKe aepl₯f~p«omraT~ssaTcB System,
The device substitutes for the  normal film camera and provides real  time information
to the  ground based  on-scene coordinator supporting  spill  control  and restoration
operations.
HEALTH EFFECTS
1984 ProgramRequest
     The Agency requests  a total of  $2,069,800 and  14.3  permanent  workyears  for
this program, of  which $1,006,900 1s  for  Salaries and Expenses and $1,062,900 is
for Research and Development.  This reflects an increase of $47,900 and  a decrease
of 5170,000  respectively.    The   decrease   results  from the  completion  of  major
                                         WQ-25

-------
portions of  two  large studies  of  the health effects  of land treatment  of  waste-
water.  These  studies  are  (1)  an  epidemiology  study  of potential  adverse  health
effects in  Lubbock,  Texas  related to  spray application treatment  using partially
treated wastewater; and  (2) a  similar  study in  Israel  of health effects related to
spray application  treatment of raw wastewater.   The results  of  these  studies will
be used to  assess the safety  of land treatment processes.   The  decrease also in-
cludes a  transfer of fu'nds from exploratory research  to the  Intermedia program.
Research emphasis  will be shifting to focus on  the health effects of land applica-
tion of sludge.

     Evaluate and  Assess Innovative and  Alternate (I/A) Technologies   to  Improve
the  T??ictency._fteli^abi1ity  and Effectiveness of HunicipaTTastewater  Yreatmehi
Systems.  Scientific  information  is needed  to  assess  the effects  on  human  health
resulting from  the exposure  to biological  and  chemical  toxicants  contained  in
wastewater.  Also, there  is a  need for health  biomonitoring  techniques to provide
complex chemical  effluent evaluations.   These  factors  supply a  major  input  to the
formulation of  EPA regulations,  permits,  and  guidelines  under the   Clean  Water
Act.  The Municipal Wastewater health  research  program  focuses  on  three major I/A
areas: 1)  provide data  on the  health aspects  of land  application  of  municipal
sludge, 2) provide data on the health aspects of land treatment, aquaculture treat-
ment and  reuse aspects of municipal  wastewater, and 3)  develop  and validate health
biomonitoring methodology  applicable  to  a  variety of  effluents  including  small
flow systems.


     Evaluate and Assess  Improved Treatment, Utilization and Disposal  Methods for
theManagement ofMunicipal   51udgg.  land disposal methods selected for sludges
require '"'careful'"1 assessment  df  affects  on human  health resulting  from  the exposure
to pollutants contained  in  the sludges.   An  appraisal document  will  be prepared on
potential effects  of  land  application  of municipal  sludge.   Research  will  focus
on pathogenic  organisms,  heavy metals,  and  organic chemicals.    Additionally,  co-
operative epidemiological  studies  of  farm  families  utilizing  sewage  sludge  for
agricultural purposes  will  be  continued.   This  scientific  health   information
serves as a  major input  to the formulation  of  EPA  regulations,  permits and  guide-
lines under the Clean Water Act.
                                                             /
1983 Program

     In 1983,  the Agency  is allocating  a  total  of $2,191,900   and  14.3 permanent
workyears to  this program, of which $959,000   is  under  the  Salaries  and Expenses
appropriation and  $1,232,900   1s  for  extramural  purposes under the  Research  and
Development appropriation.

     Eval uate and  Assess  Innoyati ye and Al tentative Techno! ogies (I'/A) to Improve
the  Efficiency,   Reliability  and  Effectlvenessj>fMl^nicijyajtfastewatertreagent
Systems.Lana treatment  of wastewater  has the  pofentiay of  causing  disease  in
humans from  either  raicrobial   pathogens  or toxic pollutants.   Current  research
activities in this program include epidemiological studies in Lubbock,  Texas and In
Israel, movement  of pollutants through the  air and soil,  and uptake of pollutants
by plants.   Research  will provide  data  on  the health, aspects  of  land treatment,
aquaculture treatment  and  reuse  aspects  of municipal  wastewater.   In  addition,
health biomonitoring methodology  applicable to a  variety of effluents,  including
small flow  systems,  is  being   developed  and validated.   This  research  is  being
carried out  in conjunction with  bioassessment of toxldty  of  effluent chemi,cal
complexes at the Agency's testing and evaluation facility.

     Evaluate and Assess  Improved Treatment, Utilizationand DisposalMethods for
the  Management  of  Municipal   Sludge.Land application  of  sludge to  food  chain
crop!has the  potential  of causing  adverse health effects  in  humans  and animals
from direct  contact  with toxic  pollutants and  from Ingestion of  contaminanted
food and  water.    Research  is   focused  on determining  the transport  and fate  of
                                         WQ-26

-------
toxic pollutants resulting  from land application  of  sludge.   Research  will  provide
data on  the  health  aspects  of land application of municipal  sludge.   The  focus 1s
on pathogens,  heavy  metals,  and  organic  chemicals  that may  be transmitted  from
sludge.

1983 Expj anati onof Changes from Budget Estimate

     The net decrease of -$59,830  results from the following action:

     -Reprogrammings.  (-559,800)   During  the development  of the  operating  plan,
several  reprogrammings were made  to this  activity  which are  not  reportable under
the Congressional  reprogramming  limitations.   These  changes  resulted  1n  a  net
decrease of -$59,800 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In  1982, the Agency obligated a total  of $3,367,230 for this program,  of which
5783,200 was under  the  Salaries  and Expenses appropriation  and  $2,584,000  was for
extramural  purposes under the Research and Development appropriation.

     Evaluate and Assess  Innovative and Alternative^Technologies (I/A)to  Improve
the ETfJgency^ RellablTtty^an^
Systems:  The  ftrst part of a two-part scientifIc appraisal  document of the micro-
biological  health effects  of  land  treatment of  wastewater  has  been written and
published reporting  on all  completed  research   and  providing  a  state-of-the-art
assessment.

     Eva!I uate and  Assess  Improved Treatment, Ut111zati on and Pisposal Methods for
the  Management of Municipal Sludge.Research on health risks of organic chemicals
ini Tand  appl"! cationhas teenpublished.  Related to this is  a report  completed on
research characterizing air pollutants from an activated sludge process.

ENVIRONMENTAL .ENGINEERING AND TECHNOLOGY
1984Program Request

     The Agency  requests  a total  of  $3,108,500 and  24.2 permanent  workyears  for
this program,  of "which 11,324,300 Is  for Salaries and  Expenses  and  $1,784,200 1s
for  Research   and   Development.   The  decreases  of  $2,932,600   and  $2,819,900,
respectively, reflect the transfer of  exploratory  research funds to the Intermedia
program and  ttie  elimination of  EPA  research  efforts  1n  new  process development,
plant operation  and  design,  development  of alternate options  of  land treatment of
wastewater, as  well  as  toxic pollutants  control   and  urban  runoff  areas.   This
reduction reflects the Agency's  view  that there are major Incentives for the pri-
vate sector  to  develop  innovative  viastewater  technology  as  a  result of  the  Clean
Water Act  amendments which provide for  a 10%  additional  Increase  to construction
grants where Innovative technology 1s  utilized. This Incentive  grant 1s  scheduled
to Increase  to  20% 1n 1985.   In addition,  if an  I/A project falls  to perform as
designed after  2 years following  final  on-slte review,  the Act provides  for  100
percent reimbursement of project costs.   Engineering  support of the  I/A technology
and sludge management  program will be continued  at  approximately  the same  level
as 1983.

     Evaluate and  Assess  Innovative andI Alternative Technologles U/A) to Improve
the Efficiency,  ReTlaoTTIty'and  Effectiveness of Municfpa'T Wastewater Treatment
Systems. Activities In this area will  support  the Construction Grant  I/A program by
providing technical  assistance 1n  reviewing  project plans and recommending innova-
                                        WQ-27

-------
tive technologies and by making available detailed planning, engineering and analyt-
ical assistance  of  I/A technologies.   New Information will be provided through the
assessment of  promising  new  treatment processes  developed by  the  industrial  or
university sectors.   Post construction evaluations  of full-scale  operational  I/A
projects will  be continued  in  1984  to  produce feedback  information on  design,
energy, capital  and operation and maintenance costs.

     Evaluate  and  Assess Improved Treatment. Utilization and Disposal Methods for
the Management of Municipal SIudjeTResearch in this program will  be conducteo1 in
two major areas: treatment and disposal of sludge.  In the treatment area, emphasis
will shift to  innovative stabilization  and digestion processes  such as high solids
retention reactors,  two-phase digestion processes,  and  fixed-film  reactors,  that
have the  potential  for  destruction  of greater  quantities  of sludge  and reducing
costs.  The  on-going  full-scale evaluation  of  the  vertical  tube reactor  for  the
treatment of high  strength  municipal  sludge will be  continued.   This technique is
efficient in energy  conservation and  has a  significant potential  for recovering
the energy gained  from the  oxidation reaction.   Research  on the disposal  area will
focus on  those projects  that  show great  promise for  minimizing handling  costs,
adverse land and environmental   Impacts.   Research   on  land application  of sludge
will concentrate on  characterizing the mechanisms  controlling  the  uptake  and the
transformation of toxic  organics and pathogenic  organisms  in  sludge amended soils.

1983 Program

     In 1983,  the  Agency 1s  allocating a total  of $8,861,000  and  65.3  permanent
workyears to this  program,  of which $4,256,900   is under the  Salaries and Expenses
appropriation and  $4,604,100  is  for extramural  purposes  under  ttie  Research  and
Development appropriation.  This year will  be a major transitional  period and will
see the orderly  phasing  out of research involving several  areas  cited in the 1984
program.

     Evaluate^ andi Assess  Innovative and Alternative Technologies (I/A) to Improve
the Efficiency" oFHuntcipal Wastewater Treatment Systems.  Fo  assist  the  Regions
and Statesin  implementing  the  1981dWA amendftents, the I/A technology  program
evaluates new  technologies  developed   by  the  private  sector  to   meet  discharge
limitations 1n  a cost-effective  manner and  disseminates  the  results to  promote
their use.  Facility plan reviews are continually being carried out for the Regions
and States to  determine  projects that  qualify for  I/A  funding.   Post-construction
evaluations of operational  I/A projects are  being  initiated and will be  used to
accelerate the transfer  of  operation  and  cost data  on successful  I/A technologies
to the municipal sector.  This  information transfer is  achieved through a central-
ized clearinghouse operated  in direct  support  to tne Construction  Grants  program
and through  a  series of  Regional  seminars.  The  evaluation  of  on-site  treatment
methods and alternative  sewer systems  is  also an integral  part  of the I/A program.

     Evaluate  and Assess  Improved Treatment. Utilization and Disposal Methods for
the Management of Municipal  Sludge.Foe alms of this research are:  (l)  to reduce
the amount of  sludge generated  and  (2)  to render it amenable  for  beneficial  uses
and for offsite  disposal.   Emphasis  Is on evaluating more  efficient sludge diges-
tion and  thermal conversion  processes as  a means  of  accomplishing  these  aims.
Emphasis is also placed on processes that conserve or recover energy, such as more
efficient incineration  and  gas  utilization  from  digesters.   Additional  research
to reduce  the  space  and labor  requirements are being  studied  for  the  various
composting processes.

1983 Explanation of Changes from Budget Estimate

     There is no change from the Budget Estimate.
                                       WQ-28

-------
1982 Accomplishments

     In 1982,  the  Agency  obligated  a total  of $16,493,300  for this program,  of
which $4,890,500 was  under the  Salaries  and Expenses appropriation and $11,602,800
was for  extramural   purposes  under  the  Research  and  Development  appropriation.

     Evaluate and Assess   Innovative and Alternative Technologies (I/A) to  Improve
the Efficiency, Reliability .and  Effectiveness  of Municipal Wastewater  Treatment
Systems.Assessment  reports  of  emerging innovative technologies were produced and
distributed at  regional  seminars for States,  municipalities and consulting firms.
The program initiated screening of operational innovative and alternative treatment
projects 1n  order  to  begin  post-construction evaluations.  Detailed  engineering
reviews of innovative facility plans were  carried  out to  satisfy a continuing need
of both the Regions and States.

     Completion of  the  work  of  the Land  Treatment  Task  Force has resulted in
significant construction grant Awards for land treatment projects as an alternative
technology, particularly in the southwest.  Successful transfer of technical infor-
mation to the  States  was accomplished through the  Task Force and by dissemination
of Land Treatment Design Manuals by the Agency.

     Evaluate and  Assess   Improved Treatment, Utilization and Disposal Methods for
the Management of Municipal Sludge.  A design  manual  whi ch  gives a  critical review
of dewatering processes and a procedure for selecting  an optimum  dewatering  strategy
has been published.   Reduction  of about 35$ in fuel  requirements for Incinerators
was demonstrated through an EPA  research  grant study by upgrading the Instrumenta-
tion and training of the operating staff.  A concise report on land reclamation and
biomass production from  municipal  sludge was published and this is being used as a
guidance document  for planning   and  designing  land reclamation  projects.   A  novel
sludge digestion process,  which  reduces  capital   costs  significantly,  was demon-
strated successfully through an EPA funded study.   Two municipalities are presently
constructing waste treatment  plants  using this process and  several  are  in various
stages of planning.
                                        WQ-29

-------
                                    WATER QUALITY

                                Industrial Wastewater


PROGRAM
Technical Information &
Liaison
Salaries 4 Expenses
Research 4 Development
TOTAL
Monitoring Systems 4
Quality Assurance
Salaries 4 Expenses
Research 4 Development
TOTAL
Health Effects
Salaries & Expenses
Research & Development
TOTAL
Environmental Engineering
4 Technology
Salaries 4 Expenses
Research 4 Development
TOTAL
Environmental Processes
& Effects
Salaries & Expenses
Research 4 Development
TOTAL
TOTAL:
Salaries 4 Expenses
Research 4 Development
ACTUAL
1982
(DOLLARS
$197.5
$4.6
$202.1
$1,992.0
$2,470.6
$4,462.6
$40.9
$23.0
$63.9
$724.7
$6,995.5
$7,720.2
$346.0
$15.0
$361.0
$3,301.1
$9,508.7
BUDGET
ESTIMATE
1983
CURRENT
ESTIMATE
1983
ESTIMATE INCREASE +
1984 DECREASE -
1984 VS 1983
IN THOUSANDS)
$69.9
$50.0
$119.9
$1,807.7
$1,190.2
$2,997.9
$16.5
$155.0
$171.5
$1,001.2
$439.5
$1,440.7
$305.0
$305.0
$3,200.3
$1,834.7

$1,842.7
SI, 190. 2
$3,032.9
$16.5
$155.0
$171.5
$1,001.2
$439.5
SI, 440. 7
$305.0
$305.0
$3,165.4
$1,784.7

$1,052.0 -S790.7
$436.9 -$753.3
$1,488.9 -$1,544.0
-S16.5
-$155.0
-S171.5
-$1,001.2
-$439.5
-$1,440.7
$311.7 $6.7
$311.7 $6.7
$1,363.7 -$1,801.7
$436.9 -$1,347.8
Industrial Wa'stewater  TOTAL  $12,809.8   $5,035.0   $4,950.1   $1,800.6 -$3,149.5
PERMANENT WORKYEARS
Technical Information 4
Liaison

Monitoring Systems 4
Quality Assurance

Health Effects
2.9
25.9
1.0
1.1
20.3
.4

21.3
.4

12.3 "-9.0
-.4
                                       WQ-30

-------
                                    WATER QUALITY

                                Industrial Wastewater

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
Environmental Engineering
& Technology

Environmental Processes
8 Effects

TOTAL PERMANENT WORKYEARS
(DOLLARS IN THOUSANDS)

   10.0        9.5         9.5
    7.5
   47.3
 3.8
35.1
 3.8
35.0
                                -9.5
 3.8
16.1     -18.9
TOTAL WORKYEARS
Technical Information &
Li ai son

Monitoring Systems &
Quality Assurance

Health Effects

Environmental Engineering
& Technology

Environmental Processes
& Effects

TOTAL WORKYEARS
    4.2


   36,9


    1.0

   13.7


    9.0


   64.8
 1.4


31.6


  .7

13.6


 5.7


53.0
32, &


  .7

13.6


 5.7


52.6
18.8     -13.8


           -.7

         -13.6


 5.7


24.5     -28.1
                                      W.Q-31

-------
                                 WATER QUALITY


                               Industrial  Wastewater


                                                                Current
                                                       Actual    Estimate    Estimate
Major Outputs/Hi 1 estones                                1982       1983        1984

Provide Quality Assurance and Monitoring  Support
for Industrial  Wastewater and National  Pollutant  "
Discharge Elimination System (NPDES)  Activities.

-  Prepare annual  QA Discharge Monitoring                9/82       9/83        9/84
   Report in support of NPDES. (Monitoring)

-  Develop quality control  samples for                              9/83
   GC/MS analytical  series. (Monitoring)

-  Develop/test feasibility of whole-volume                          9/83
   performance evaluation samples. (Monitoring)

Develop/Validate  Measurement Systems  for  Industrial
Wastewater Discharges and NPDES Support,

-  Develop/standardize/validate analytical                9/82        9/83
   methods for high priority pollutants
   required by NPDES. (Monitoring)

-  Review applications/recommmend approval                9/82       9/83        9/84
   for 1-3 general and 90-100 specific equiv-
   alent test procedures. (Monitoring)

Develop/Evaluate  Scientific and Technical Tools  to
Support Permitting and Enforcement Activities.

-  Provide user manual for determining                   9/82
   tbxicity reduction achieved by waste
   treatment. (Env. Processes)

-  Provide Toxicity Reduction Manuals for               10/83      10/83
   selected Consent Decree Industries. [Env.
   Technology)

-  Revise and update Treatability Manual.                6/83       6/83
   (Env. Technology)

-  Provide unique analyses identifying                             9/86        9/86
   recurring organics not identifiable
   through existing GC/MS tape library.
   (Env. Processes)
                                       WQ-32

-------
                                   WATER QUALITY


                               Industrial Wastewater
Budget Request
      The Agency  requests  a total  of  $1,800,600 and 16.1 permanent  workyears for
1984, a decrease  of 33,149,500 and  18.9  permanent workyears  from 1983.  Included
in this total  is 51,363,700 for  Salaries and  Expenses  and 5436,900  for Research
and Development,  with  decreases of  $1,801,700  and $1,347,800  respectively.   The
decrease occurs mainly  In  the  monitoring  and quality assurance and in the environ-
mental engineering  and technology  program  elements.   In  addition,   the decrease
reflects the transfer  of $202,500  in exploratory research funds  to the  Intermedia
program.

Program Description

     There are  two  major  research  goals  in  this program.  The  first is to assure
the quality  of  industrial  effluent  data  and  to  resolve  deficiencies  in existinq
analytical and  monitoring  methods  for toxic  components.  The  second  goal  is to
help assure a sound technical  and scientific  basis  for the defenslbllity of Agency
regulations and  policies   on  industrial  water pollution  control.   The following
objectives support these goals:

     Objective 1.  Provide Quality Assurance and Monitoring Support for   Industrial
Hastewaler and  Natipna11 _POIiutant uiscnarge^ |i1fflinati_o_n_jystemjNPPLS)  ftctivniesr.
The objective of  this  research under this activity is ^^rcrvTde qiial'ity "as'siiranc'e
support to ensure that all  measurement data  on industrial   wastewater  discharges
used by EPA are reliable and accurate so that data used by the Agency  for decision-
making Is of the  highest quality.

     Objective 2.  Develop and Validate Measurement Systems  for  Industrial Waste-
water T)Ysc1iar'geT1and_NPiteS suppporg  rh'ls 'research provides prlcticable,''Verffied
least-cost methods  for monitoring  industrial  effluents  (both  self-monitoring by
industrial dischargers  and  monitoring by  local,   State and  Federal   regulatory
agencies) for compliance  with  permit conditions.   Monitoring  requirements must be
issued by the Administrator  in carrying out  provisions of  Sections 304(h), 308(a)
and 402 of  the Clean  Water Act for use   by  Federal,  State, local  and  Industrial
organizations to  show  compliance with  the National  Pollutant Discharge  Elimination
System.

     Obj ecti ve 3.  Develop and Eva!uateScientific and Technical Tools   to  Support
Permitti ng 'and' En'f'olTelelTt AcriVitiesT  ("nYs	work	provides advance'" notice	of emer-
ging or prevlousTy-unrecognized industrial wastewater pollution problems*.  This re-
search also provides tools for simplified, more expeditious Issuance  of industrial
discharge permits.   This   research,   by providing  user  manuals  on   treatability,
toxicity reduction, etc., makes consistent guidance  available on the most up-to-date
and efficient techniques for permit  issuance.

TECHNICAL.INFORMATION AND LIAISON

1982 Accomplishments

    In 1982, the  Agency obligated  a total of  $202,100  for this  program, of "which
$197,500 was under  the Salaries and Expenses  appropriation  and $4,600 was for ex-
tramural purposes under the Research and Development appropriation.   This activity,
which supports  research programs across all media, was consolidated into the Inter-
media program  in  1983.  Thus,  the .Program Description,  1984• Program jtequest, .1983
Program, and 1982 Accomplishments narrative sec.tlons appear "Were.             "~~~*
                                      WQ-33

-------
MONITORING SYSTEMS AND QUALITY ASSURANCE

1984 ProgramLRequest

    The Agency  requests  a total  of SI,488,900  and 12.3  permanent  workyears  for
this program,   of  which  $1,052,000  is   for  Salaries and  Expenses  and $436,900  is
for Research  and  Development.   This reflects  decreases  of  $790,700 and  $753,300
respectively.   These decreases  result   from  the  transfer  of exploratory  research
funds to the  Intermedia  program  and the completion of analytical methods  for  most
of the technology-based  effluent  guidelines.  These decreases  also  reflect a  re-
direction of  Agency  priorities   toward  water  quality-based  permit  limitations.
Continuing research will  emphasize  support  to the  Agency enforcement program  and
the National Pollutant Discharge  Elimination System (NPDES) in  the  implementation
of the technology-based  effluent limitation  regulations  and  the  modification  of
enforcement activities  as  required by  water  quality-based  permit  adjustments.

    Provide  Quality Assurance and Monitoring Support for Industrial  Wastewater and
NationalPollutantDischarge £iym?n'aWb₯System (₯PJ)ES)  ActTvl'ties.    The research
program willsupport  NPDES  quality  assurance by providing quality control  samples
and protocols  for  their  use  in performance  evaluations  and   laboratory  quality
controls.  The National Pollutant Discharge Elimination  System Standards  Repository
will be maintained,  and, where  appropriate,  standards  will  be made according  to
National  Bureau of  Standards (NBS)  reference  materials.   Quality  assurance  audit
support to the  NPDES  Discharge Monitoring Report (DMR)  monitoring network  will  be
continued to  maintain  the reliability  of the data  and  to  document  its precision
and accuracy.   Streamlined and  more  cost-effective quality assurance  tools  will  be
developed for use in enforcement activities.

    Develop and Validate Measurement Systems  for  Industrial   Wastewater  Discharges
and  NPPES|Supporfl  Research will validate and correct analytical  methods for high
priori 'ty indus trT ail  wastewater  components  and  evaluate  alternative   analytical
methods to  support  the NPDES  program.   Component  elements  of   the  NPDES  priority
organic pollutant test procedures approved in  1983  under  the provisions  of Section
304(h) of the  Clean Water Act will  be re-evaluated for  deficiencies and modified
to make them more applicable to all  wastewaters.

1983Program

    In 1983 the Agency  is   allocating  a  total  of  $3,032,900  and  21.3 permanent
workyears to  this  program,  of  which $1,842,700 is  under  the Salaries and Expenses
appropriation and  $1,190,200 is  for extramural  purposes under the Research  and
Development appropriation.

    Provide  QuaIJty Assurance and MonftorlngSupport for Industrial Wastewatgr and
Nationa^PoTTu^ant'ffls                          (WKX)lActTJitijeS;.   TKe   o'peratTon
of the NPDfiS  Standards Repositt>ry'is continuing.   Development  W a  new series of
standards for the gas chromatography/mass spectrometry test procedure is  to be com-
pleted and the standards will be available for use in NPDES efforts.  The  feasibility
of whole-volume performance evaluation samples will be evaluated.  The annual  NPDES
Discharge Monitoring Report monitoring network audit is being continued.

    Develop and Validate Measurement Systems for Industrial  Wastewater  Discharges
and NPUES support.me muiti-laboratory priority  pollutantanalytica(methods vaii-
datTorfTtudies  will be completed and final reports will  be available.   Develooment
of a  surrogate  test procedure  for certain organic chemical pollutants will be com-
pleted.  Work  on  identifying  and correcting  deficiencies  related to the general
applicability of some  test  procedures  for the priority  organic pollutants will be
initiated.
                                        Q-34

-------
1983 Explanation of Changes from BudgetJEst-firiate

     The net increase of +535,000 results from the following action:

     -Reprogrammlngs.  (+$35,000)  During  the development  of  the operating  plan,
several repr o g r amnii rigs were  made to this activity  which  are not  reportable  under
the Congressional   reprogramming limitations.   These  changes   resulted  in  a  net
increase of +$35,000 to the Salaries and Expenses appropriation.

1982 Accompl i shments

     In 1982, the Agency obligated a total  of $4,462,600 for this program,  of which
$1,992,000 was under the Salaries and Expenses appropriation and 52,470,600 was for
extramural purposes under the Research and Development appropriation.

     Provide Quality Assurance and Monitoring Support for Industrial  Uastewater and
Natl ojnjTJ'o 1Vuta n j[ !) i s ch a r g₯ ~ETi mt nation Sys tern (rt.P b E S) Activities.  THe  operation
oT	tWWDWTtanlar3s"Mposi tory  was coriti nued' an? expanded to  i ncl ude standards
for most priority  pollutants.   The annual  audit of  the NPDES Discharge Monitoring
Report monitoring network was completed.  A "Handbook on Analytical Quality Control
in Water and Uastewater Laboratories" was completed and made available.

     Develop and Validate, Measurement Systems• for Industrial Wastewater  Discharges
and NPDES Support.  Acomprehensive EP'A' d HanciSoblc f or "Ssmpl i ng ami Sample Preserva-
tion in  yater and  Uastewater"  was  completed.   Several  guides for  automation  of
analytical systems were published.   Formal  multi-laboratory  studies  were conducted
on several  categories  of  priority  pollutants.   Standardized  analytical  methods
were provided for  13  classes of pesticides and  the  test  procedures  manual  for the
priority organic  pollutants  was  published.  The  NPDES  alternate test procedures
equivalency program made  several  nationwide and about 90  case-by-case equivalency
recommendations.

HEALTHEFFECTS

1984 Program Request

     The Agency requests no  resources for this  program.  This  reflects a  decrease
of $171,500,  of which  $16,500  is for  Salaries and Expenses  and $155,000  is for
Research and Development, and a decrease  of 0.4 permanent workyears.  These reduc-
tions  reflect  the  general  phase-down  in industrial  research  as  a  result  of the
completion of  research  support  for the effluent guidelines  and the  Consent Decree
efforts.  Some  work  will  be  continued  in  other budget areas on  short-term health
effects testing  methods for complex  mixtures  which  will  have  applicability  to
industrial and other effluents.

1983Accomplishments

     In 1983, the  Agency  is  allocating a total of $171,500 and  0.4 permanent work-
years  to  this  program,  of  which $16,500 is under  the  Salaries  and Expenses appro-
priation and 5155,000 is for extramural purposes under the Research and Development
appropriation.

     Develop and Evaluate Scientific and Technical Tools to Support Permitting  and
Enforcement Actl vTfi es.  81 bass ay" methods which  prove to nave Dest applicant nty to
complex eYfTuents  are being further refined.  Such tests will allow permitting.offi-
cials  to  utilize  better health  effects information  for establishing proper waste-
load allocations for specific water  bodies.

1983 Explanation of Changes  from Budget Estimate

     There is no change from the Budget Estimate.
                                       WQ-35

-------
1982 Acc omp 11 s hroent SL

     In 1982, the Agency  obligated  a total of  $63,900  for this program,  of  which
540,900 was  under  the  Salaries  and  Expenses  appropriation  and 523,000  was  for
extramural purposes under the Research and Development appropriation.

     Develop and Evaluate Scientific and Technical  Tools to Support  Permitting  and
Enforcement  Activi'ties."Evaluations of a number  of healtheffects bioassays
for their appTi cabi 11 ty in  determining  toxicity of industrial discharges were begun.
These bioassays are for use in a group  of test methods  for assessing  carcinogenic,
mutagenic, and reproductive risks related to industrial  effluents.

ENVIRONMENTAL ENGINEERING AND TECHNOLOGY
1984 Program Request

     The Agency requests no  resources  for this program.  This  reflects  a  decrease
of $1,001,200  for  Salaries and Expenses, a  decrease  of $439,500  for  Research  and
Development and a  decrease of 9.5 permanent workyears.  These  reductions  reflect
the transfer of exploratory research  funds to the Intermedia program and the phase-
down in  industrial  wastewater research  as  a result  of completion of  research in
support of  technology-based  effluent  guidelines  and the  Consent  Decree  efforts.
All effluent guidelines scheduled  for  promulgation  are  expected to be  completed by
1984.  These  reductions  also  reflect  the  Agency's  view that  the private  sector
should have  the  predominant  role  in  pollution  Control   technology  development.

1983 Prqaram

     In 1983, the Agency is allocating  a  total of SI,440,700 and 9.5 permanent work-
years to this program, of which $1,001,200 is under the Salaries and Expenses appro-
priation and 3439,500  Is  for  extramural  purposes  under the  Research  and  Develop-
ment appropriation.

     Develop and Evaluate Scientific  and Technical  Tools to Support Permitting  and
Enforcement Activities.  A study of acid  discharges  from lead  and zinc mining refuse
pTTeTWfl evatuate the extent to which  tailings piles', which  contain toxic heavy
metals, are  affecting  ground and   surface water.   The metal  finishing  Industry Is
being examined  to  determine  if  changes  in  NPDES  permit  limitations  might  be
warranted because  treatment  technologies have advanced or  because changes  in  the
state-of-the-art of manufacturing  processes  have occurred.   Available  cost-versus-
performance data 
-------
     Develop and Evaluate Scientific and Teclifn'cal  Tool s i__tq ^Support Permitting  and
Enforcement ^Actlyrt.1 es .  TreatablTity "research, "TncTuding^work" 'on We toxicity re-
duction' concept, provided support to regional office and State permitting activities
and enforcement efforts.  This  work defined the efficiency,  reliability  and costs
of various  existing technologies  for  treating  toxic  pollutants.   The  extent  of
toxicity reductions by using various technologies was documented.

     Evaluations of abatement pollution controls for textile, pesticide, petrochenn
ical, and electroplating wastewaters were completed.  Documentation of the engineer-
ing and economic advantages  of the centralized  waste treatment  concept  for small
business metal  finishers and  the  development  of  a  novel method  for removal  of
toxic heavy  metals  from  industrial  effluents  were  also  provided.   These results
were produced in support  of the  promulgation of  effluent guideline regulations and
the issuance of individual industrial  discharge permits.

EHV I RONMENTAL PROCESSES AND EFFECTS

1984 Program^ Request

     The Agency requests  a  total  of $311,700 and  3.8  permanent workyears for this
program, all of which  is for  Salaries and Expenses.   This is an increase of 56,700
from 1983.   The level  of effort of the program in 1984  will  remain  about the same
as in 1983.

     Develop and Evaluate Scientific and Technical  Tools to Support Permitting  and
Enforceiiien't  Act1vfti₯s~.  This program  will  continue to provide Information on the
compbsi tl on  of corapl ex i ndustri al effluents.  The information will be gathered from
scanning the data  which were  generated by gas  chromatographic/mass spectrometric
(GC/MS) analyses of industrial  effluents.  This information, which  is compiled in
a GC/MS computer tape library, is being verified by specialized analyses-

1983 Program

     In 1983, the Agency  is allocating  a  total  of  $305,000 and  3.8 permanent work-
years to this program;  all  of which is under the  Salaries and  Expenses appropria-
tion.

     Develop and Evaluate Scientific and ^                                    and
Enforcement  ActlvTtTesV   me  (JC/flS 'tapeTfBrary  wli 1  be maintained and information
on addi t Tonal ₯f f 1 uen t characteristics  will be added.   This work  is being performed
in response  to needs of the program office.

1983 Explanation of Changes from Budget Estimate

     There is no change  from  the Budget Estimate.

1982 Ace ora pi i s hments

     In 198Z, the  Agency obligated a total of  $361,000 for this program, of which
$346,000 was  under the  Salaries and  Expenses appropriation and 515,000  was for
extramural purposes under the Research  and Development  appropriation.
     Develop i and ExfJM^ Scj_ej^t1_f_1c artd Tec.hnlcal Tools  to Support  Permitting   and
E n f orcemen-t "Actiy'l ti es .  Tapes from 20,000 GC/MS runs were analyzed  and  the  identi-
ties ot  500  selected  compounds  were confirmed.   The  Effluent Guidelines Division
and the Permits Division of the Office of Water utilized  these  analyses  in develop-
ing guidelines and  in  formulating permitting procedures.  Additionally,  a methodol-
ogy for determining levels of toxicity in  the leather tanning industry's  wastewaters
was developed.
                                      WQ-37

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
                                                                            Page
WATERQUALITY

    ABATEMENT 4 CONTROL
       Water Quality State Programs Management	  WQ-39
          State Programs Management...	  WQ-41
          Great Lakes Program...	  WQ-46
          Chesapeake Bay Water Quality Study.....	  WQ-47
       Effluent Standards & Guidelines	  WQ-50
       Grants Assistance Program.	  WQ-55
          Clean Lakes Program	  UQ-56
          Control Agency Resource Supplementation (Section 106)..,	  WQ-57
          Training Grants (Section 104).....	  WQ-59
       Mater Quality Strategies Implementation	  WQ-60
          Dredge & Fill	,	,	  WQ-63
          Ocean Disposal  Permits....	  WQ-63
          Environmental Emergency Response & Prevention	  WQ-66
          Standards A Regulations	..	  WQ-67
       Water Quality Monitoring & Analysis^.	  WQ-70
       Municipal Source Control	  WQ-74
          Municipal Waste Treatment Facility Construction..'	  WQ-77
          Corps of Engineers....	  WQ-81
          Waste Treatment Operations ft Maintenance	  WQ-82
          NEPA Compliance - Municipal  Hastewater Treatment
            FaciTity Construction	  WQ-83
                                       WQ-38

-------
                                    WATER QUALITY

                       Water Quality State Programs Management

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 YS  1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
State Programs
Management
 Salaries & Expenses
 Abatement Control &
 Compliance
Great Lakes Program
 Salaries & Expenses
 Abatement Control &
 Compl i ance
Chesapeake Bay Water
Quality Study
 Salaries & Expenses
 Abatement Control &
 Compl tance
TOTAL:
 Salaries & Expenses
 Abatement Control 4
 Compliance

Water Quality State
Programs Management
       $12,286.1   59,661.4   59,290.4   $8,284.6 -51,005.8
        $3,597.1     $350.0     $350.0     $180.0   -$170.0

TOTAL  $15,883.2  $10,-Oil.4   $9,640.4   $8,464.6 -$1,175.8
        $1,396.3   $1,313.5   SI,313.5     $800.0   -$513.5
        $4,178.8   $2,500.0   $3,500.0   $2,897.3   -$602.7

TOTAL   $5,575.1   $3,813.5   54,813.5   $3,697.3 -$1,116.2
          $277.9
        $1,600.2

TOTAL   $1,878.1
           $53.1
          $900.0

          $953.1
                    -$53.1
                   -$900.0

                   -$953.1
       $13,960.3  $10,974.9  $10,657.0   $9,084.6 -$1,572.4
        $9,376.1   $2,850.0   $4,750.0   $3,077.3 -$1,672.7


TOTAL  $23,336.4  $13,824.9  $15,407.0  $12,.161.9 -$3,245.1
PERMANENT WORKYEARS
State Programs                    258.9      200.0      210.1
Management

Great Lakes Program                16.2       10.8       10.8

Chesapeake Bay Water                4.4                   2.0
Quality Study

TOTAL PERMANENT WORKYEARS         279.5      210.8 •     222.9
                                            170.4     -39.7
                                             10.8
                                            181.2
                                                       -2.0
                                -41.7
TOTAL WORKYEARS
State Programs
Management

Great Lakes Program
           .312.3
            21.6
254,4
 15.0
266.4      212.4     -54.0
 15.0
15.0
                                       WQ-39

-------
                                    WATER QUALITY

                       Water Quality State Programs  Management

                                ACTUAL   BUDGET     -CURRENT    ESTIMATE   INCREASE  +
                                 198Z    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983       1983              1984  VS  1983

                                {DOLLARS IN THOUSANDS)

Chesapeake Bay Hater                5.4                  2.0                -2.0
Quality Study

TOTAL WORKYEARS                   339.3      269.4      Z83.4      227.4     -56.0
                                      WQ-40

-------
                                   WATER QUALITY


                       Water Quality State Programs  Management
Budget Request
     The Agency requests a  total  of 312,161,900 and 181.2 permanent workyears  for
this subactivity.   Of this  amount,  59,084,600  will  be for the Salaries and  Expen-
ses appriation  and  S3,077,300 will  be  for the  Abatement,  Control  and Compliance
appropriation, for a decrease of S3,245,100 and 41.7 permanent workyears.

Program Description

     This area provides  for the overall management  of State  financial assistance
programs and other  local programs  for  water pollution control.  It includes  over-
sight of  Section  205(g)  construction  grants  management delegation  agreements  and
water quality management programs under Sections 106, 201, 205(j), 208, and  303  of
the Clean  Water  Act.   The  subactivity also  provides  for  administration  of  an
interagency agreement with  the  U.S.  Army Corps of Engineers;  support  for  training
of water  pollution  control  personnel;   and administration of  the Great Lakes  and
Chesapeake Bay programs.

     For Agency budgetary purposes, these  activities are divided  into three program
elements:

     State Programs Management — This  program includes monitoring and  overview  of
State activities  to  implement negotiated   agreements  under  Section 205(g)  of  the
Clean Water  Act,  which  provides  for  phased  transfers  of  delegable  construction
grants project and program management activities, administrati on  of the interagency
agreement with the  Corps  of Engineers, jand training programs  to meet  professional
manpower development and  training  needs of wastewater  treatment  plant  operators
and EPA:, State, and private sector personnel.   OWer construction grant management
resources are described in the Municipal Source  Control  subactivity.   This program
element also  includes  management of water quality  and State  financial assistance
programs under Sections 106, 201, 205(j), 208,  and 303 of the Act.

     Great Lakes Program -- This program provides  assistance  in implementing U.S.
programs insupport  of the U.S. -  Canada  Great Lakes Water  Quality Agreement.   A
major focus  of  the  program is the measurement  of ambient conditions  in  the  Great
Lakes in order to  determine compliance  with the objectives  of the Agreement.  The
monitoring activity measures water quality  trends and the effectiveness of remedial
responses to emerging pollution problems.

     Chesapeake Bay Program Water Quality  Study -- This  program  was  developed  in
response to a Congressional niandate requiring EPA to conduct a study of the  Chesa-
peake Bay.  The objectives of the study were define the factors adversely  affecting
the environment, develop research  to address  adverse  factors, and define  manage-
ment strategies  to  ameloriate  degradation  of  water  quality in  the Bay.  The
program has been developed through a cooperative effort among the affected States,
local governments, and EPA.

STATE PROGRAMS MANAGEMENT

1984 Program Request

     The Agency requests  a total  of $8,464,600 and 170.4 permanent workyears  for
this activity, including $8,284,600 under  the Salaries  and  Expenses appropriation
and $180,000  under  the  Abatement,  Control  a-nd Compliance  appropriation.  This
represent a decreases of $1,175,800 and 39.7 permanent  workyears.  Of  this amount,
$1,005,800 will be  from  the Salaries and  Expenses appropriation and $170,000 will
be from the Abatement,  Control and Compliance appropriation.
                                      WO-41

-------
     These decreases primarily  reflect progress in  State delegation of  construc-
tion grants management, reduced oversight of State  water quality  management  activi-
ties, completion of EPA's study of urban nonpoint source runoff problems,  a  phasing
down of assistance to the States in identifying nonpoint source problems and devel-
oping related control programs, and a  reduction in resources  needed  for management
of wastewater treatment plant operator training funds.

     Oversight:  In accordance with EPA  policy to delegate maximum  management respon-
sibi 1 ity arid authority,  EPA will   continue  working with  the  States  to coordinate
program objectives and outputs  and to  integrate  funding mechanisms.  EPA  and  State
program managers will  determine annual program priorities and commitments;  Agency
personnel will   provide feedback  and  assistance  based  on  the   results  of  annual
evaluations. These efforts  will  provide essential  links to ensure  that  Federal
and State  objectives,  priorities,  and funds  are meeting  construction  grants  and
water quality management  needs through  the most  cost-effective approaches.   The
Federal program  will  emphasize results-oriented  oversight  of  activities  where
there are priority financial, water quality, or public  health  concerns.

     Corpsof Engineers:  EPA and the  Corps  of  Engineers will continue efforts  to
ensure theintegrityof  construction  grants  projects  and prevent  waste,   fraud,
or abuse.  Corps activities, which are described under  the Municipal  Source  Control
subactivity, will   be  supported  by  $16,000,000  in  the  Abatement,  Control  and
Compliance appropriation.   EPA  will  negotiate  annual  workplans  and monitor  Corps
of Engineers accomplishments 1n priority  areas,  Including preconstruction  reviews,
on-site presence at  large,   complex  projects,  interim   and  final inspections,  and
special construction management activities.

     State Delegation:  Of the 49 States  (including Puerto Rico)  with signed  dele-
gation agreements  in 1984,  a total  of 36 States will  be fully   delegated for man-
agement of construction grants, an  Increase of six over  1983.  The Agency  expects
this level of  delegation to continue  essentially  unchanged  for the near  future.
Based on  this   assumption,  the program  may  be  considered  as  essentially  fully
delegated. In 1984, States will  provide 2,140 workyears or 68* of the total  manage-
ment staffing,  the Corps of Engineers 14S, and EPA  18%.

     Water Quality Management:  During  1984,  EPA will   continue  implementation   of
simplified water quality management regulations and the water quality  based approach
initiated in 1982.  The Agency wMl update  guidance to  the States In the  following
areas:  the eligibilities of various  activities, including monitoring and standard
setting for funding under Section  205U)  of the Act, procedures  for  revising  State
continuing planning  processes,  and  procedures  for  insuring the  consistency   of
permit and construction grants decisions  with  water  quality management plans.   EPA
will continue to focus water planning activities on insuring that States complete
their identification of priority water bodies  and  the  States  carry out reviews  of
the consistency of plans with water quality  management  decisions.

     Financial  Assistance: Grants   totaling  $24,000,000 are  being  requested  for
award under  Section  106  of the Clean Water  Act to support  State and Interstate
water pollution control  programs.   States  will target funds to permits and  en-
forcement activities,  including  high  priority ambient  and  source  surveys.   One
third of  the States  are  expected  to  usie part of their  Section 205(g)   funds  for.
these priority  activities,  in addition to supporting their delegated construction
grants management   programs.  In  1984 the  States will  obligate  590,797,000   in
205(g) funds to support  activities  eligible for funding under this  Section  of  the
Clean Water Act.

     In addition,  the  Agency expects  to  award $24,407,792 to the  States in 1984
for activities  under Section 205(j).  The highest priority for funding will  be  the
review of water quality  standards  to  determine if  designated  uses can be  attained,
water quality management  planning,  and associated monitoring,   EPA  will  continue
Its efforts to  ensure that State processes  for developing Section Z05(j)  workplans
focus on effective approaches to solving  water quality problems  and  involve local,
regional, and interstate agencies  closest to water  quality problems.
                                       MQ-42

-------
     EPA will work with the States to ensure effective coordination of Section 106,
205(g), and  205(j)  financial  assistance agreements. A  study  will be  conducted  to
determine how effectively  Section  106 and 205(j)  funds have  been  coordinated and
used in  1982 and 1983,  with   findings  leading  to  recommendations  for  improved
management.

     In 1984  EPA will  assist  States  that  received  grants  in 1982  and 198?  for
wastewater treatment  plant operator  training  and will  loot"  to the  Stated  and^
municipalities to  establish  self-sustaining  training  programs   without  Federal
funds.   :

1983 Program

     In 1983, the  Agency  is allocating .a total  of S9,640,400 and  210.1  permanent
workyears to  this  program,  of which  $9,290,400 is for  Salaries  and  Expenses  and
5350,000 is  for  extramural purposes  under  the Abatement,  Control and  Compliance
appropriation.

     Oversight:, EPA policy is to give  States  maximum  latitude  in  managing environ-
mental  programs   while  the Agency retains  appropriate  overview  responsibility.
EPA overview  responsibilities  include  ensuring  program accountability  in  meeting
statutory goals,   assessing  how  program and  management accomplishments  meet  these
goals,  providing  information transfer  on program progress  and problems,  and ensur-
ing efficient use  of  resources.   In 1983  EPA will  evaluate current overview  prac-
tices for  each  water program and  develop,  as appropriate, an  integrated  overview
policy  covering  all water programs.

     Streamlined Section  20S(g)   delegation  management  regulations  and  guidance
will be issued,  strengthening State project  responsibilities and defining State and
EPA program  oversight  roles.  EPA  will  fulfill  the role of overall program manager
of an  increasingly  delegated  effort  by  working with  the  States  to  define  annual
national program  priorities and objectives, monitor  and  evaluate accomplishments,
and provide needed management assistance.

     Corps ofiEngineers: Duri,ng  1933,  EPA  and  the Corps  of Engineers  will  also
continue fntansive efforts to ensure the integrity of  construction grants projects;
prevent waste, fraud, and abuse; and respond effectively to allegations -or evidence
of problems.  In accordance with negotiated  and approved plans,  the Corps of Engin-
eers will  conduct preconstruction reviews,  maintain  on-site  presence  at  large,
complex projects, and conduct interim and final  inspections.

     Delegation:  Three  additional  States  are  expected to  sign an  Initial  Section
205(g)delegation management agreement, bringing  the  total  to 49  delegated States.
Of these 49 States, 30 are expected to have  assumed full responsibility for managing
the construction  grants program, an increase  of 9  over 1982.    States  are  expected
to commit 2,078 workyears  or 642 of the total construction grants management staffing
in 1983. EPA will provide 19% of the total  and the Corps of Engineers the remaining
17%.

     Water Quality Management; In  1983, EPA's water planning activities  will  focus
on encouraging the States  to  establish water quality  needs based priorities.   The
Agency  will  help  the  States  determine the most cost-effective  mixes  of  municipal,
industrial, and  nonpoint source controls needed to meet attainable uses on priority
water bodies.  State  water quality management  plans   and  continuing  planning-pro-
cesses  will  be  updated.  As the  States develop confidence in  accomplishing  these
activities, EPA  will  increasingly   rely on  the States  to  carry  out  the  plan  con-
sistency reviews required by the Act.

     Simplified  water  quality  management  and  standards regulations  embodying the
water quality based  approach  will be  promulgated.   Administrative   reforms  have
already increased the States'  flexibility in planning and implementing water quality
programs.
                                        WQ-43

-------
     Financial Assistance:  Funds   totaling   554,400,000  have  been  allocated  for
award under  SectToiT T06 of  the  Clean Water  Act  to support  State  and Interstate
water pollution control  programs-   Increased funding for  permits  and enforcement
activities, including  necessary  intensive  surveys,  will   have highest  priority
under Section 106 in  1983.

     The Agency expects the  States  to obligate  $45,200,000 in 1983 for activities
under Section 205(j).   Priority  activities  for  Section  2Q5(j)  funding are  water
quality standards, planning,  and associated  monitoring.   States  are  expected to
implement this new planning  program  in coordination with  appropriate local  agen-
cies.  The Agency  expects  the  States to obligate  3107,103,000  in  1983 to support
activities under  Section  205(g).    Priority  activities   are   State   construction
grants management.

     Major emphasis will be  placed on  negotiating  coordinated financial assistance
agreements with the States  covering Sections 106,  205(g),  and 205(j) funds.  State
resources for planning, monitoring,  and  water  quality  standards  activities  under
the water quality based approach will  be  supplemented  primarily by Section 205(j1
grants-  Section 106 and 205(g)  funds will  be  provided  primarily  for permitting,
enforcement,  water quality monitoring,  and State  construction  grants management.
      |S in 1982, the fcgency -wi U -manage and .allocate  tn.«  198? Congressional .asf
of $2,625,200  for  operator Jraintng for  support 'and  level opment^ of  State ; self-
sufficiency and improved municipal  treatment facilities Compliance;

     Nonpoint Source Controls:  Headquarters  will  publish  a  policy   statement  on
appropriate Federal,  State,  and local   roles  in identifying and  solving priority
nonpoint source problems. The final  report  of  the  five  year National Urban  Runoff
Project (NURP)  will  be  published   and  transmitted to  Congress  in  1983.  A NURP
handbook on determining  instream effects  of pollution sources  will  be published.
EPA will  work  with the U.S.  Department  of   Agriculture's  (USDA's)  Rural  Clean
Water Program  to  publish Best  Management Practices  (BMPs)  for pest  control  and
salinity problems.  EPA will  continue work  with  the USDA  and North Carolina State
University in  monitoring  selected  costsharing  projects  to  determine  the most
cost-effective agricultural BMPs.   A yearend progress  report  will  be published in
September.  The EPA - Forest Service interagency agreement was  renewed to continue
work on silviculture nonpoint source control implementation.

1983 Explanation of Changes from Budget  Estimate

     The net decrease of -5371,000  results from the following  actions:

     -ReDrogrammings.  (-$371,000)   This  change  reflects  the  reversal  of the con-
struction grants  restructuring  which  was  not approved  by  Congress.   Since the
restructuring was proposed  some six months earlier,  reversing  the action  revised
the earlier resource  estimates  and  resulted  in  a net  change  of  -563,700  to the
Salaries and Expenses appropriation.

     During the  development of the operating  plan,  several  reprogrammings were
made to this  activity which  are not reportable under  the Congressional reprogram-
uring limitations.   These  changes  resulted  in  a  net  decrease  of  -$307,300 to the
Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982,  the  Agency  obligated $15,883,200 and 258.9 permanent  workyears for
this program  activity,  of  which $12,286,100  was  under the  Salaries and Expenses
appropriation and 53,597,100 was for extramural purposes  under  the Abatement, Con-
trol and Compliance appropriation.
                                       WQ-44

-------
     Regulatory Reform: Early in 1982, EPA proposed changes to  construction  grants
regulations to  simplify  program requirements, decrease  costs,  and increase  State
management flexibility.  Following  enactment of the  1981  Amendments to the  Clean
Water Act,  EPA developed*"  re-gulations,  pol'icy,  and  guidance  documents  needed  to
implement the  statutory  requirements.   Interim  final  project  management  related
regulations were published within five months of  enactment.

      During 1982, the Agency  continued a major  effort to  reorient management  of
the construction  grants  program away  from  Federal  project  decision-making  and
toward results-oriented  overview of delegated State  program  activities.  EPA  and
States established joint  program priorities  and  began  developing coordinated  ap-
proaches to  assure  improved  facilities  performance, local  financial  capability,
elimination of  backlogs,  prevention of  waste,  fraud and  abuse,  increased  dele-
gation, and  refinement  of  construction  grants  obligation and  outlay  projections.

     One additional  State  accepted  initial  Section 20S(g) delegation, bringing  to
46 the number  of  delegated States and Territories;  21 of these  States  assumed full
responsibility for project management, including  assistance provided by the  Corps
of Engineers.  States  committed  1,901  workyears  to program  management in 1982,  59"
of total program  resources.  EPA  staff  represented 22%  of  total  staffing and  the
Corps of Engineers 19%.

     EPA initiated a  major  effort  in  1982  to  reorient management  of  the  water
programs, and  to  enhance program performance. The Agency's proposed  revisions  to
the Clean  Mater Act'  were  developed  and proposed to  Congress.  Simplified  Water
Quality Management regulations  were drafted  for  Federal^ Register publication  as
proposed rules, in coordination  with  development of  revTsed 'Grants  Management  and
Water Quality Standards regulations. A comprehensive guidance  and  review  system  was
implemented, emphasizing a water quality based approach,  including update  of  State
continuing planning processes and water  quality  management  plans.  The performance
of all EPA Regions and selected States was  reviewed during the year.

     Fi nancial Assistance:  A total  of  551,338,300 in Section 106 grants was awarded
to State and  interstate  water pollution control  agencies.  Principal  1982  funding
priorities included issuance  and reissuance  of  major permits,  enforcement,  water
quality standards reviews, and  associated monitoring. Several  States  supplemented
their Section 106 grants  with Section  205(g) funds,  particularly for permits  and
enforcement activities.  In 1982 States  obligated  $50,131,000 under  Section  2Q5(g)
primarily for construction  grants management activities.

     In 1982 total of 322,200,000 available under Section 205{j)  for water quality
planning was  reserved  for  obligation  by the States  in  1983.   Several  States  are
planning to reserve funds  for  obligation but have not done so  as  of January  1983.
Priorities for use of these  funds include wasteload allocations,  analysis  of  total
maximum daily  loadings,  water  quality standards  attainability  reviews,  and  site-
specific criteria studies.   Joint State,  areawide, and  local  development  of  work-
plans for these activities was underway at year end.

     Nonpoint Source  Controls:  The preliminary report  on the results  of the Nation-
wide Urban Runoff Program  was  completed.  Handbooks  on  identifying  and  correcting
significant stonnwater control   problems "were completed  as  part  of  the  Project.
EPA worked with theUSDA  in the Rural Clean Water Program to  publish an agricultural
nonpoint source control planning manual and state-of-art  report on best  management
practices for  handling  animal  wastes,  use  of  fertilizers,  and  sediment  control.
EPA and  USDA   soil  conservation  agencies  continued  working  with  North  Carolina
State University in a  study  to  determine the  most  cost-effective  agricultural  best
management practices  through cause  and effect monitoring of  selected Rural  Clean
Water and  other cost-sharing projects.  EPA  also  worked with  the Forest  Service
under an interagency agreement to implement training  for foresters and forest land
owners.
                                        WQ-45

-------
      In-response  to  Congressional  directives to  focus  training  funds on  allevi-
ating noncompliance problems  1n Federally funded  roijnici^al  plants/EPA  obligated
53,907,000 from  the  Congressional add-on  to fund  on-site,  oyer-the-shoulder'  op-
erator training  programs  conducted  by  State  agencies (especially tnose with  dedi-
cated Section  109(b)   centers)  and  other  qualified training, organizations.   An
additional 5236,000=  of  -the  add-on  was   obligated  for  salary  costs associated
with the program.

GREAT LAKES PROGRAM

1984 Program Request

     The Agency  requests  53,697,300  and 10.8 permanent  workyears  for 1984,  a  de-
crease of SI,116,200  from 1983.   This  request  includes  5800,000 for the  Salaries
and Expenses  appropriation  and  $2,897,300  for  extramural   purposes under  the
Abatement, Control  and Compliance appropriation,  with   decreases  of 5513,500  and
5602,700, respectively.   The  requested level will  allow EPA  to  continue to meet
our commitments  under  the U.S.  -  Canada Great Lakes Water Quality  Agreement.   The
decrease reflects  completion  of the Niagara River  (Lake  Ontario) ground water con-
tamination study as  well  as  completion of  grant awards  for  demonstrating  inno-
vative control  techniques under Section 108(a) of the Clean Water Act.

     The Great Lakes program  will  support the International  Joint  Commission.   It
will respond to information  requests  and  will  provide technical  assistance  to
Headquarters and the   State  Department  on  official  Canadian  requests  and  notes
concerning U.S.  Great  Lakes  policies.   Staff   support  and  technical assistance
to the Mater Quality  Board and  its  committees  will  continue  to ensure  that U.S.
views and policies are accurately  represented.

     The compliance of U.S.  industrial  and  municipal  dischargers  with the  Inter-
national Agreement objectives will  be assessed  and reported to  the  Commission.

     A Great Lakes surveillance program  to detect toxic substances in Great  Lakes
fish and  sediments will  be conducted  1n  20 tributaries and  10 harbors,  respec-
tively.   Results will   be analyzed  and  reported  to  the  States  for regulatory
follow-up.

     The atmospheric deposition sampling network  will  be  maintained  and  data  an-
alyzed to  determine  loadings  to  the  Lakes   of  organic chemicals,  nutrients  and
heavy metals.

     A sampling  network  and  strategy  to monitor  the  trophic  status  of  the con-
necting channels will  be designed and  implemented.   Annual   surveys  of the  lakes
1n spring,  summer, and fall  will  be conducted  in cooperation  with State  and Can-
adian agencies   to  determine  the annual  variability  of   ambient phosphorus  concen-
trations and the levels and trends in metals  and conventional  pollutant parameters.
This monitoring strategy, along with the fish, sediment,  and  air data,  will  provide
the information  necessary  to assess  compliance  with  Agreement  objectives,   to
evaluate effectiveness  of  control  programs  and  to Identify emerging  problems.
EPA will  continue  to  work with  the States  to implement  State-EPA  Action  Plans
developed in 1983 to address remaining  pollution problems in  the lakes.

1983 Program

     In 1983, the  Agency  is allocating 54,813,500 and 10.8 permanent  workyears to
this program, of which $1,313,500 is  for the Salaries  and  Expenses  appropriation
and 53,500,000 is for extramural purposes under the Abatement, Control and Compliance
appropriation.

     The major focus of  the program  continues to be  directed  toward  support  of  the
U.S. - Canada Great Lakes Mater Quality Agreement.
                                        WQ-46

-------
     International Joint  Commission  sponsored Agreement  activities will  be  sup-
ported by the United  States and  Canada.   Annual  lake water  quality  surveys  will
be conducted on  Lakes  Michigan,  Huron and Erie,  and  an  intensive  survey in  coop-
eration with Canadian and State agencies will be conducted  on Lake  Superior.   Fish
Fish, sediment and  air sampling  will  continue  to  determine  levels  and trends  of
nutrients and toxicants affecting Great Lakes water  quality.  Joint State,  local
and other Federal agency  efforts  will  continue  to develop plans for further  phos-
phorus reductions in  the  Lower Lakes.   EPA  and the States  will  develop  Action
Plans to address remaining pollution problems  in  the 12 most significantly degraded
areas of the Lakes.

1983 Explanation of Changes from Budget Estimate

     The net increase of +S1,'000,000 results  from  the  following action:

     -Cong ressional  Action.-  (+$1,000,000)  The Congressional  add-on  to  this activ-
ity of +$1,000,000  to  the  Abatement,  Control  and  Compliance appropriation  is  to
continue the Section 108(a) program of  demonstration  grants to  test new  or innova-
tive wastewater techniques, as well as to carry forward water intake and high  flow
tributary monitoring to  determine water  quality  trends  and  pollutant loadings  in
the Lakes.

1982 Accomplishments

     In 1982, the Agency obligated 55,575,100 and  16.2 permanent workyears for this
program, of which $1,396,300  was for  the  Salaries  and Expenses appropriation  and
$4,178,800 for the Abatement,  Control  and Compliance appropriation.

     In 1982, the Great Lakes National  Program continued its lead role  in coordinat-
ing and  implementing U.S. programs in  fulfillment  of the U.S.-Canada Great  Lakes
Quality Agreement.   Specific  activities  conducted  in  1982  to ascertain ambient
conditions included fish  flesh  analyses from nearshore  and  open water  locations;
sediment surveys  of suspected  toxic  hot spots in  tributary mouths;   atmospheric
deposition collections  at 41  sites;  and mathematical  modeling  to determine trans-
port, fate, and maximum allowable loading of  pollutants.

     Other accomplishments  included  Initiation  of  a  major  ground  water contami-
nation investigation in the Niagara River Frontier in  cooperation  with New  York
and other  Federal   offices  as  part of the Administrator's  Niagara River Agenda.

     The program also funded cooperative programs with  State and local  entities in
31 counties  in  Indiana,  Michigan,  Ohio and  New  York to  encourage the  voluntary
adoption of  best  management  practices  to  further  reduce  phosphorus  loadings,
particularly to Lakes Erie and Ontario.

CHESAPEAKE BAY WATER QUALITY STUDY

     The purpose of the six-year  study  was to identify problems,  conduct research,
and develop management  recommendations to preserve and enhance  water  quality  in
the Chesapeake Bay.  Of ten major  problem areas,  three  have  top  priority:  toxic
substances, submerged aquatic vegetation, and nutrients  (eutrophication).  Approx-
imately 40  research projects  on  the three priority areas  have been completed,  or
are nearing completion.   All  publications  are being  disseminated through the  Nat-
ional Technical  Information Service, U.S. Department of  Commerce.

1984 Program Request

     Information developed  during the  course  of the  Chesapeake Bay study will  be
disseminated in  1983.   No further resources  are  needed to  complete  the Agency's
commitments in this area.
                                       WQ-47

-------
1983 Program

     In 1983  the  program  is  allocating $953,100  and 2.0  permanent workyears  to
this program  of  which $53,100  is  for  Salaries  and Expenses  and  5900,000 is  for
Abatement, Control and Compliance.

     The Agency will  complete and publish all  remaining technical  studies in  the
three priority areas  of  the program:  toxics,  nutrients,  and  submerged  aquatic
vegetation.

     Toxic^Substances:  The study  identified the relative  amount  and  distribution
of tolcTcsubstances  Th  the water,  sediments,  and living organisms  throughout  the
bay and  major tributaries.   Natural  and  manmade  sources  of  toxics  were  noted,
along with the rate  at  which toxic substances  traveled  to  different parts of  the
bay and the degree to which they changed from  their original  condition.   The  final
segment of this study developed options  for reducing toxics  in the  bay.

     Su bme rge d Aqua tic Vegetation -L  The  study  investigated  the effects  of manmade
changes in water quality 6rnsubme~rged aquatic  vegetation.   The study also measured
the impact of  the decline  on various  species  of fish and  wildlife.  This segment
of the study proposed alternatives  for  preserving and enhancing bay  vegetation  and
associated species of fish  and wildlife.

     Nutrients (eutrophication):  This segment of the study  identified the effects
on thebay ecosystem  of nutrients  such as  nitrogen and phosphorus.  This  section
of the  study  proposed measures  for limiting  agricultural  nonpoint source  runoff
and other measures to limit  nutrients  flowing  into  the  bay  from  the  Susquehanna,
Potomac, and James Rivers.

     EPA plans to  disseminate the  results  of the Chesapeake  Bay program's studies
through the National Technical  Information Service  and  by  holding two major con-
ferences to provide opportunities  for discussion  of the  findings  of these reports.
The first  conference  is designed  for  participation by  various   agencies at  the
Federal, State, and local  level who are responsible for maintaining and enhancing
ambient environmental quality in the Chesapeake Bay  region.   The second  conference
is designed for  participation by  the  general  public.   These conferences will  be
based on the work in the three priority  areas.

     During 1983  EPA  will  maintain the computerized data  base for use  by  States
and local  governments.   The  Agency is working  with  the  States  to transfer  the
computer and its data base  to them by  the  end of this year.

     In 1983  the  program  will   also  publish  four  major  reports describing  the
findings in the three priority areas.   The "Chesapeake Bay  Primer"  explains  impor-
tant ecological relationships in the bay and is a basic  reference  for understanding
future reports.  The  "Synthesis Report"  explains  the  technical  knowledge  gained
from all Federally funded  research for  the three priority  areas.  This  report  was
distributed to Congress  and  the  public in  September 1982.   The  "Chesapeake  Bay
Characterization Study"  explains  the  trends in  data relating environmental  qual-
ity fish, and wildlife populations, from the late 1930s  to the present.   Statistics
in these  areas  will  be  analyzed  for  significant  trends  comparing environmental
quality and fish  and wildlife  populations.  The "Management  Alternatives Report"
explains the  results  of  various modeling  exercises to  analyze  the technical  and
economic feasibility  of  various pollution  abatement strategies including control
of toxics; nonpoint  source runoff  from  agriculture, urban  areas,  and  contraction;
and sewage treatment plants, and industrial  dischargers.
                                       WQ-48

-------
1983 Explanation of Changes from Budget jjtimate

     The net increase of +$953,100 results  from the  following  actions:

    ' -Congressionaj Action.  (+$953,100)  The Congressional  add-on  to  this  activity
of +5900,000 -to the  Abatement,  Control  and Compliance .appropriation will  complete
final hand-off  of  the  Chesapeake  Bay study results and  responsibilities to  the
States.

     (+$53,100)  This increase includes +$53,100 of the +10.5 million Salaries  and
Expenses add-on which  supports  the  480  additional  permanent  full-time workyears
provided to the Agency.

1982 Accomp11shments

    •During 1982 the  Agency  obligated $1,878,100 and 4,4  permanent workyears,  of
which $277,900  was  for  Salaries and  Expenses  and  $1,600,200 was  for Abatement
Control and Compliance.

     In 1982, the Chesapeake Bay Program  completed  the following work.

     Ches_apeake Bay Primer:  Published.

     Synthesis Report:  Published.

     Chesapeake Bay Characterization Study:   Draft  report completed.

     Management Alternatives:  Draft report completed.
                                       WQ-49

-------
                                    WATER QUALITY

                           Effluent Standards &  Guidelines

                                ACTUAL   BUDGET      CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE  -
                                           1983        1983              1984 VS  1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Effluent Standards &
Guidelines
 Salaries & Expenses           $4,901.3   $4,785.5   $5,429.6    S4.220.7  -$1,208.9
 Abatement Control &           59,141.8   $7,448.5   $7,448.5    $5,407.1  -$2,041.4
 Compliance
                       TOTAL  $14,043.1  $12,234.0  $12,878.1    $9,627.8  -$3,250.3

TOTAL:
 Salaries I, Expenses           $4,901.3   $4,785.5   $5,429.6    $4,220.7  -$1,208.9
 Abatement Control 4           $9,141.8   $7,448.5   $7,448.5    55,407.1  -$2,041.4
 Compliance

Effluent Standards 4   TOTAL  $14,043.1  $12,234.0  $12,878.1    $9,627.8  -$3,250.3
Guidelines
PERMANENT WRKYEARS
Effluent Standards 4               82.8       68.4       82.7        60.0     -22.7
Guidelines

TOTAL PERMANENT HORKYEARS          82,8       68.4       82.7        60.0     -22.7


TOTAL WORKYEARS
Eff 1 uent Standards &              102,7       93.4      107.7        82.9      -24.8
Guidelines

TOTAL WORKYEARS                   102.7       93.4      107.7        82.9      -24.8

-------
                                   WATER QUALITY


                         Effluent Standards and Guidelines
Budget Request
     The Agency  requests  $9,627,800 and 60.0 permanent  workyears for 1984, a  de-
crease of  S3,250,300  and  22.7  permanent workyears  from  1983.   Included in this
total is $4,220,700 for Salaries and Expenses and 35,407,100 for Abatement,  Control
and Compliance, with decreases of 51,208,900 and $2,041,400,  respectively.

Program Description

     This subactivity  includes  establishing  effluent  limits  for industries dis-
charging directly  to  waterways  and  indirectly  through   publicly  owned  treatment
works (POTWs),  Effluent standards and guidelines are promulgated under the  author-
ity of Sections 301, 304, 306, 307, and 501  of the Clean  Water Act.

     The Clean  Water  Act  established  a  comprehensive   program to  "restore   and
maintain the chemical, physical, and  biological integrity  of the Nation's waters."
This program is part  of  EPA's effort to implement this legislative mandate  through
the issuance of effluent  standards, pretreatment  standards, and  new  source  perfor-
mance standards for industrial dischargers.  Through this  program, the Agency  estab-
lishes a number  of different kinds  of effluent  limitations  which   are  summarized
below.

     Best Practicable Control Technology  limitations (BPT) are  generally based  on
the average of the  best existing performance  i>y  plants of various sizes,  ages,  and
unit processes within  an  industrial  category or  subcategory.   In establishing BPT
limitations, EPA considers  the  total  cost  of applying the treatment  technology  in
relation to the  effluent  reduction  derived,  the  age  of facilities   and  equipment
involved, the production  process  employed,  the  engineering aspects   of  the  control
technologies, process  changes,  and  non-water quality  environmental  Impacts,  in-
cluding energy requirements.

     Best Available Technology  Economically  Achievable  limitations (BAT)  generally
represent the best  existing performance in the industrial  category or subcategory.
The Act establishes BAT as the  principal  national means  of  controlling  the direct
discharge of toxic and nonconventional pollutants into navigable waters.   In arriv-
ing at BAT, the  Agency  considers the same factors that are considered  in arriving
at BPT.  The Administrator retains considerable discretion in  assigning the  weights
to .be accorded these factors.

     Best Conventional Pollutant Control Technology  limitations  (BCT) are based  on
the "best conventional pollutant control technology"  for  discharges of conventional
pollutants from  existing  sources.   Conventional  pollutants  include  biochemical
oxygen demand, total  suspended  solids, fecal  conform,  acidity (pH), and  oil  and
grease.  BCT is not an additional limitation, but replaces BAT  for the conventional
pollutants.  In addition  to other factors,  the  Act  requires that BCT  limitations
be assessed in  light of  a two-part  "cost   reasonableness"  test.   The  first test
compares the cost  for  private Industry to reduce  its  conventional pollutants with
the costs  to  POTWs for  similar  levels  of  reduction  in  their  discharge  of such
pollutants.  The second  test  examines  the  cost-effectiveness  of treatment  beyond
BPT.  EPA must find that  limitations  are  reasonable  under both  tests before estab-
lishing them under BCT.   In no case may BCT  be less stringent than BPT.

     New Source Performance Standards (NSPS) are based on the  best available demon-
strated technology (BDT),   New plants have the opportunity to Install the best  and
most efficient production processes and wastewater treatment technologies.
                                       WQ-51

-------
     Pretreatment Standards for Existing Sources (PSES)  are designed  to  prevent  the
discharge of pollutants which pass through,  interfere  with, or are  otherwise  incom-
patible with the  operation of a POTW.  The  Clean  Water Act of 1977  requires pre-
treatment for pollutants  that  pass  through  the POTW  or  interfere  with the  POTW's
treatment process  or  chosen  sludge-disposal  method.   The  legislative  history   of
the 1977 Amendments  indicates  that pretreatment  standards are  to be  technology-
based, analogous to BAT for  removal of  toxic pollutants.   EPA  has  generally  deter-
mined that  pollutants  are  passing  through  a  POTW  if  the percent  of pollutants
removed by  a well-operated  POTW  achieving  secondary treatment is  less  than  the
percent removed by the BAT model  treatment  system.  The general pretreatment reg-
ulations which serve as the  framework  for the  industrial  pretreatment  efforts  are
found at 40 CFR Part 403.

     Pretreatment Standards for New Sources  (PSNS),  like PSES, are to  prevent  the
discharge of pollutants which pass through,  interfere  with, or otherwise are  incom-
patible with the  operation of  a POTW.   PSNS are to be. issued at the same time  as
NSPS.  New  indirect dischargers, like new direct dischargers,  have the  opportunity
to Incorporate the  best  available  demonstrated technologies.   EPA  considers  the
same factors in promulgating PSNS as it  considers in promulgating PSES,

     In developing each regulation the  Agency  examines  industrial  processes, water
usage, wastewater characteristics,  and treatment technologies  in use  or  potentially
applicable   The  requirement for  economic achievability  has led the Agency to con-
duct extensive studies  of the financial  and economic achievability  of regulatory
options.  These  options  are examined  separately   to  determine the possibility  of
closures as  well  as  impacts on  production  levels, employment,  industry  size  and
concentration, foreign  trade,  regional   economics, and  the  economics  of  related
industries.

     In the  past,  EPA was  unable  to  promulgate many of  these regulations  by  the
dates contained in the 1972  Act.   In  1976,  as  a result  of delays  1n  issuing these
regulations, EPA  was   sued by  several   environmental  groups;  the outcome  was  a
Settlement Agreement.   The  Settlement Agreement required EPA  to develop  a program
and adhere  to a  schedule  for 21 major  Industries  with  37 industry categories  and
to promulgate BAT effluent  limitation   guidelines,  pretreatment   standards,   and
NSPS for  65 "priority" pollutants  and  classes of  pollutants.  (See  Natural  Re-
soures Defensg pouncil, Inc. v. Train,  8 ERG 2120 (D-D-C.  1976). modified  March  9,
1979.) The 1977 Amendmentstothe1972  Act  incorporated elements of the Settlement
Agreement related to  toxic pollutant control.   Section 301(b)(2)  of  the Act  now
requires the achievement  by  July  1,  1984 of effluent limitations  requiring  appli-
cation of BCT for conventional  pollutants and BAT  for toxic pollutants,  including
the 65  "priority"  pollutants  and classes  of  pollutants  which Congress  declared
toxic under Section 307(a)  of  the 1972  Act.  Likewise,  NSPS and pretreatment stan-
dards were redirected toward toxic pollutant controls.

     Because the Agency was  unable to  meet  deadlines contained in the Settlement
Agreement, in 1981  EPA moved  to  modify  the  proposal  and promulgation dates.   In
May 1982, the U.S. District  Court  for the District of Columbia  ordered the  Agency
to propose  and  promulgate regulations  In compliance with a  new  time  frame.   In
June 1982, the Agency submitted to the Court a streamlined schedule which  presented
its best estimates for  completion  of  industry  projects.   In August 1982,  the Court
approved this streamlined  schedule.

     EPA is now in compliance with the  Court's  schedule,  and  is issuing all  guide-
lines on time.  Between 1978  and  December 31,  1982,  effluent  guidelines  standards
regulations were  proposed for  21  Industrial  categories  (Includes  electroplating
pretreatment regulations  proposed  1n  1978)  and   promulgated  regulations  for   13
industrial categories  (includes  electroplating  pretreatment   and  timber  products
processing, promulgated in 1979  and  1981,  respectively).   In 1983,  regulations
will be proposed for 14 Industries (includes deferred  segments for  four  industries)
and promulgated for 15 industries.  In  1*984, regulations will  be proposed for  one
industry and promulgated  for 9 (includes deferred segments  of four  Industries).
                                       WQ-52

-------
EFFLUENT STANDARDS AND GUIDELINES

1984 Program Request

     The Agency  requests  a total  of  $9,627,800 and  60.0 permanent workyears  for
th.is program, of which $4,220,700  will  be for the  Salaries and Expenses appropria-
tion and 55,407,100  will  be  for  the  Abatement,  Control  and  Compliance appropria-
tion.  This is a decrease of $1,208,900 and $2,041,400 respectively, which reflects
the Agency's progress  in  developing effluent  standards  and  guidelines.   In  1984,
the program will continue its progress on three fronts.

     Complete Regulatory Requirements:  The  Agency  will  complete   technical,  eco-
nomi c, stati stical ,  environmental   Ttudies,   and  regulatory  flexibility  analyses
prior to promulgating  effluent  guidelines for the four  previously  deferred indus-
tries and  the   remaining  six  industries.  The  Agency   will  perform  verification
sampling and analysis  and  technical  studies  prior  to  developing improved pretreat-
ment standards  for  new sources  for the  six  "dirtiest"  industries  based  on  Para-
graph 4(c)  of   the  Consent Decree.   These  industries  discharge toxic  pollutants
which are incompatible with a POTW.  In accordance with  Section  316{a)  of the Act,
the Agency  will  repair tne  remanded regulation for cooling water intake structures
and develop guidelines for  the prevention of thermal  pollution  from steam electric
generating  plants.

     Assist State Control  Efforts:  EPA  will  provide engineering  and  scientific
support to  Regional  and State permit  writers for development  and negotiation  of
permit limits.   This will  enable permit  writers to make  decisions  based on protec-
tion of water  quality at  20  organic chemical  complexes and two  integrated  manu-
facturing complexes  with  combined waste  streams  from two  more  product processes.
Assistance will be provided in  developing approximately 165 plant-specific permits
and 40  industry-specific  general  permits concerning  facilities with  the  same  or
substantially similar types of operations.

     jmprove Regul ati on Devel opment;  The  Agency  will   identify  innovative  tech-
nologies and product  substitutions which may  be significantly  more cost-effective
than BAT.   Section 301(k)  of  the CWA allows  for the  extension  of  compliance dead-
lines for "Innovative technologies," where "Innovative"  refers to treatment systems
which reduce pollution loadings  at substantially  lower  costs.  EPA will  also pro-
vide technical,  statistical  and  economic  support  to   post-proposal/promulgation
litigation  and negotiations on effluent guidelines.

1983 Program

     In 1983, the  Agency  is  allocating  a total  of $12,878,100  and 82.7 permanent
workyears for  this  program,  including  $5,429,600 for  the  Salaries  and  Expenses
appropriation and 57,448,500  for  the  Abatement,  Control  and  Compliance appropria-
tion.  Extramural funds are being  used  for the completion  of technical  Investiga-
tions, economic and  statistical  support,  exposure  and risk assessments, analytical
and sampling support, and support for litigation and  remand work.

     In 1983, the program will focus on the following  key areas.

     Eliminate Backlogs:   The program will publish proposed regulations establishing
national effluent  limitations  and standards  for  14   industries  (includes deferred
segments of four industries) and promulgate effluent  limitations for 15 industries.
            mv                  .        Tlle Program will assist.State and
EPA permT£  wri ters  in  analyzi ng  and 1 nterpreti ng  information  on  treatability  of
toxic compounds, conventional pollutant  cost tests, controls  for toxic pollutants
not covered  by  national  regulations,  and  controls  for  facilities  that  include
manufacturing processes not covered by national standards.
                                       wq-53

-------
     Through consultation  activities,  EPA will  assist State  and Regional  permit
writers in  resolving  engineering,  economic,  scientific  and statistical  problems
arising from  permitting  activities  based on  effluent standards  and  guidelines.

     Improve Our Regulatory Actions: The program  will perform  Regulatory  Impact
Analyses and environmental assessments  required  by  Executive Order 12291  and  re-
view regulations which will  have a  significant  economic   impact  on  a  substantial
number of small entities  as required by the Regulatory  Flexibility Act.

     Additionally,  EPA will assess  samples from  the Combined Sewer Overflow  Study
and issue  a final  report,  provide  technical,  economic,   and  statistical support
for post-proposal/promulgation negotiations,   and develop  a multi-media  regulatory
approach for  several  emerging synthetic  fuels  industries  including  low-BTU coal
gasification, medium coal gasification, and gasohol  production.

1983 Explanation of Changes from  Budget Estimate

     The net increase of  +$644,100 results from the following action:

     -Congressional Action.  (+$644,100)  This increase includes  +$644,100  of  the
$10.5 million  Salaries and Expenses add-on  which  supports  workyears  in the pro-
posal and promulgation of industry category effluent guidelines.

1982 Accomplishments

     In 1982, the Agency  obligated a total of $14,043,100  for this program, includ-
ing $4,901,300 for  the Salaries  and Expenses appropriation and $9,141,800 for  the
Abatement, Control   and   Compliance  appropriation.    Contract  resources  were used
for technical  analytic studies,  economic and  statistical  analyses,  health  effect
determinations, and environmental exposure and risk  analyses.   Program  accomplish-
ments included proposing and  promulgating BAT guidelines, pretreatment  standards,
and NSPS.

     This program  also prepared  three  regulations  establishing  national  effluent
limitations and standards  resulting  from  the Settlement Agreement and the Act  and
promulgated three  regulations; it also proposed  a revised BCT methodology and  BCT
limitations.

     Assistance was provided  to  Regional and  State permit  writers  for  analyzing
and interpreting information on the treatability  of toxic  pollutants and nonconven-
tional treatment cost test, controls for toxic pollutants not covered  by  effluent
standards and  guidelines, and the application of effluent  standards and  guidelines
to industrial processes not covered by  national  regulation.

     During 1982,  the Office  of  Management Systems and Evaluation (OMSE)  reviewed
the Agency's procedures  for  internal   review  and  coordination  of draft  effluent
guidelines prior to publication  in  the  Federal Register.   OMSE  developed  recommen-
dations for  streamlining the  internal  Agency review process.  These measures were
adopted and  applied to  the review  of  eleven final  guidelines and eight  proposed
guidelines during 1982.  The  streamlined review  procedures  resulted in  a  signifi-
cant saving  of time.  They  insure that the time  needed for  internal Agency  review
will not be  an impediment to  compliance with the Court-ordered deadlines  for pro-
posing and promulgating all remaining effluent guidelines.
                                       WQ-54

-------
                                    WATER QUALITY

                              Grants Assistance Programs

                                ACTUAL   BUDGET     CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983       1983              1984  YS  1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Clean Lakes Program
 Abatement Control
 Compliance
        $8,992..!

TOTAL   $8,992.1
Control Agency Resource
Supplementation
(Section 106)
 Abatement Control 4
 Compliance
$3,000.0

$3,000.0
Areawide Waste
Treatment Management
Resources
 Abatement Control &
 Compliance
Training Grants
(Section 104)
 Abatement Control 4
 Compliance
TOTAL:
 Abatement Control
 Corapli ance

Grants Assistance
Programs
       $51,338.3  $40,845.6  $54,200.0  $24,000.0

TOTAL  $51,338.3  $40,845.6  $54,200.0  S24.000.0
                                                   -S3,000.0

                                                   -S3,000.0




                                                  -$30,200.0

                                                  -S30,200.0
                       TOTAL
             $.5

             $.5



          $168.4

          $1.6.8.4
  $169.0

  $169.0
TOTAL


       $60,499.3  $40,845.6  $57,369.0  $24,000.0


TOTAL  $60,499.3  $40,845.6  $57,369.0  $24,000.0
   -$169.0

   -$169.0


•$33,369.0


•$33,369.0
                                      WQ-55

-------
                                   WATER QUALITY


                             Grants Assistance Programs
Budget.Request
     The Agency requests  a total  of  $24,000,000  under the Abatement,  Control  and
Compliance  appropriation, a  decrease of  $33,369,000  from  1983.   This  total  in-
cludes decreases  from  1983 of $30,200,000 for  State  water pollution  control  pro-
grams under .Section  106,   5169,000  in Section 104  Training  Grants and  $3,000,000
for the Clean Lakes program.

Program Description

     Federal  assistance to the States  for water  quality programs  is covered  in
three programs: 1) Clean Lakes grants under Section 314,  2)  control  agency program
grants under Section 106,  and 3)  training grants under Section 104.

     Clean Lakes Program — Section 314 of the Clean Water Act sets forth  the prin-
cipal  administrative and  technical  requirements  for developing  a  national  program
to enhance the quality of  freshwater lakes.

     Control  Agejcy Resource Supplementation (Section   106)--  These grants  supple-
ment State resoWces for water po 1Tuiioh contro 1  programs. They are negotiated ann-
ually with 50 States,  1 territories,  and  6  interstate  compact agencies.  Funds have
been directed to  cover  a  wide range  of water  quality  programs,  including permits,
enforcement,  monitoring,  construction  grants  management, water  quality  planning
and standards,  wasteload   allocations, nonpoint  source control, prefeatment,  oil
and hazardous materials spill  response, and other priority programs.

     States also  receive   financial  assistance  for water quality program  activi-
ties under Sections 205
-------
provided will  be  allocated  according  to  the  following  priority  criteria:   (a)
additional funding  would  complete  existing   implementation  projects;  (b)  would
complete projects  regardless  of their  present status;  (c)  would  support  in-lake
restoration activities  as  opposed  to • watershed  management projects;  (d)  would
support lake projects  close  to a  standard  metropolitan statistical area;  and (e)
funding is appropriate and necessary.

1983 Explanation of Changes from Budget Estiniate

     The net •increase of +$3,000,000 results from the following  action:

     -Co.ngres si on al Ac tl on.  (+53,000,000)   The Congressional  add-on to this activ-
ity of +33,060,000 to 'the Abatement,  Control  and Compliance  appropriation  was for
the Clean Lakes Program.

1982 Accompli shments

     In 1982, 58,992,100  was  obligated from the Abatement, Control  and  Compliance
appropriation under the Clean Lakes Program to help complete  25  existing implemen-
tation projects.  The funds provided were awarded according to the criteria outlined
by the Congress, that is: (a)  only existing implementation  projects  would be eligi-
ble for funding; (b)  priority  would be given to projects within  a standard metropo-
litan statistical area;  (c) priority  would be  for  in-lake  restoration activities;
(d) additional   funding  would  complete  the  project; and (e)  certification  of ad-
ditional  funding requests would be by  the Regional  and State offices.

CONTROL AGENCY RESOURCE SUPPLEMENTATION (SECTION 106)

1984 Program Request

     In 1984, the  Agency requests  a  total  of 524,000,000  for  Section  106  grants
under the  Abatement,  Control  and  Compliance  appropriation. This represents a de-
crease of  $30,200,000  from the  1983  level.  This  reduction  reflects the  availa-
bility of funds under Sections 205(g)  and 205(j) which  will enable  States  to carry
out priority activities such as  revision of  water  quality  standards,  permits issu-
ance, and enforcement.  In addition, there will be  a  reduced  need  to  provide fund-
ing for management  and overhead  activities  in grant  programs  which  will  benefit
from reduced Federal  reporting  and oversight  requirements.  At the   beginning  of
1984 approximately S200 million  will  be available   to States  under  Section  205(g).
While the bulk  of  these  funds  will support construction grants  management  activi-
ties, they  will  be  available  as well  to  support programs  that  also  receive funds
through 106  grants.  In 1984,  when  funds  under the 106 program are combined  with
funds available  under  Sections 205(g)  and  205(j),  States  will  have  available  to
them approximately $139,000,000  to  carry  out  various  water quality  activities.

     State program activities  primarily  funded  under Section 106 will  continue  to
include National  Pollutant Discharge  Elimination   System  (NPPES)   permitting,  en-
forcement, associated  ambient  and  source  monitoring,  nondelegated  construction
grants program activities, and  State  program administration.  Construction  grants
management related activities will  be  funded  under Section 205(g); the  States may
also use these funds  for  permitting and dredge and fill activities. Water  quality
standards reviews, wasteload  analyses, and water  quality  management  planning and
associated monitoring will be  funded primarily under Section 205(j).

     Financial  assistance to the  States  in  1984 will emphasize  both  phases of the
water program  strategy  under  the  Clean  Water Act.   Technology based  work  will
Include issuance of  permits  for Best Available Technology  Economically  Achievable
(BAT) and  secondary  treatment  limits.  The States  will  also  develop water  quality
based effluent  limits  through  identifying  their priority  water bodies, analyzing
the attainability of their standards,  performing total  maximum daily load and waste
load allocation calculations,  issuing  water quality based permits,  and implementing
nonpoint source controls where needed to meet designated uses.
                                       WQ-57

-------
     Section 106 grants  will  continue to emphasize major NPDES  permit reissuance,
including BAT  permits  and  permits  needed to  address problems  in priority  water
bodies; enforcement, particularly in  the area of municipal  facilities  compliance;
and monitoring essential  to support permits  issuance  and enforcement.  Two  State
MPDES programs will  be  approved,  bringing  to 38  the number  of States that  have
assumed NPDES  delegation.   Modifications  of  approved  NPDES  programs,  including
three new  State  pretreatment programs,  five added   Federal  facility  permitting
programs, and 10 more  State general  permit programs,   also are  expected. The  other
States will continue to assist EPA with NPDES permits  and enforcement.

1983 Program

     In 1983,  554,200,000,  including  a  Congressional  add-on of  $13,354,400,  will
be used for  Section  106  grants under the Abatement, Control and  Compliance appro-
priation.  These funds  will  be  matched by  over 590  million  in  State  resources.

     State activities primarily funded under Section 106  will include  NPDES permit-
ting, ambient and source monitoring of toxics and conventional  pollutants,  enforce-
ment, nondelegated  construction  grants  program activities, nonpoint source control
programs management,  and  State   programs  administration.  Delegated   construction
grants management related  activities  will  be  funded  under  Section 205(g).   Water
Quality standards  reviews, planning,  and  associated monitoring  will  be  funded
primarily under Section 205(j).

     Increased 1983  resources  for NPDES permitting, especially  issuance and  reis-
suance of  BAT permits,  will   allow  the  States  to reduce   backlogs.   Enforcement
efforts al so will be  strengthened, with continued  emphasis  on municipal  facilities
compliance.  States will  continue to use Section  106 funds for monitoring essential
to permits issuance and enforcement.  States with critical  nonpoint source  problems
will also continue  to  use  Section 106 funds to  initiate, where  necessary, control
programs directed  to priority water bodies  as  a  necessary  adjunct to  existing
point source control programs*

     During 1983, one more State  NPDES program will  be approved, bringing the  total
to 36;  the  other States  will  continue  to  assist  EPA in  many aspects of permits
issuance. In  addition,  several  States  will  be  developing  NPDES program  modifi-
cations to assume pretreatment,  Federal  facility, and  general  permitting  responsi-
bilities.  The States will  issue or  reissue 750  major  discharger  BAT  permits,
including toxics controls.  Nearly 4500 State compliance inspections  will  be  con-
ducted and the States will  take increasing responsibility for compliance activities.
All States will  develop  analytical  capabilities to  support increased  emphasis  on
water quality  based  permitting,  toxics  control,  and  requests  for  variances  as
well as  strengthen  their  abilities  to perform conventional  pollutant wasteload
analyses for  major permits.  An  estimated  19  States   will  manage nonpoint  source
control programs.

1983 Explanation of Changes from  Budget Estimate

     The net increase of +513,354,400 results from the following action:

     -Congressional Action.  (+$13,354,400)  The  Congressional add-on to this activ-
ity of +jT3,JS?74W~ior the  Abatement, Control and Compliance appropriation was for
the State water grants under Section 106 of the Clean  Water Act.

1982Accomplishments

     In 1982, S51.338.400 was obligated for Section 106 grants under the Abatement,
Control and Compliance appropriation, matched by over  $90 million  in  State resour-
ces. State activities  funded  under  Section 106  included  NPDES  permitting, ambient
and source monitoring  of toxics  and conventiona.1 pollutants,  enforcement, oil and
                                       WQ-58

-------
hazardous materials spin response, nondelegated construction grants program activ-
ities, water quality standards reviews, nonpoint source control  programs management,
water quality planning, training, and State orograros administration.

     The States increased emphasis on NPDE5 permitting, especially major permit re-
issuance and Best  Available  Technology  permits.   Thirty-five States  with approved
NPOES programs, an  increase  of two from the 1981 levels,  issued  and  reissued more
than 12,000 permits,  including 700 major  permits.   Enforcement  efforts  were also
increased, with emphasis on municipal  facilities compliance. National  reorientation
of EPA  water  programs  was  reflected  in 1982  State workplans  for  water  quality
standards reviews, which incorporated use  attainability  and site-specific criteria
considerations.  Overall monitoring costs  were reduced  by  more  effective focusing
of resources on  priority program needs, Section  106 support to  nondelegated con-
struction grants program activities was  decreased significantly.

     Approximately 700  major  discharger permits  were  issued  or reissued  by  the
States, including  permits  for  BAT and  toxics;  over  3500 compliance  inspections
were conducted and  nearly  1600  enforcement actions were  initiated,  concentrating
primarily on municipal  facilities  compliance.   State NPOES  programs  were modified
to include  pretreatment programs  and Federal  facilities  permitting.  Twenty-five
States were  operating  biological  monitoring  programs   during  1982;  about  twenty
States developed capabilities  to perform conventional  pollutant  wastelo.ad analyses
for major permits. Fifteen States managed nonpoint source control programs based on
completed water quality management plans.

     Finally,  a total  of  $500 was obligated  in  1982   from existing  grant  funds
for water quality management planning under Section 208.

TRAINING GRANTS (SECTION 104)
1984 Program Request

     We are  requesting  no funds  for these  grants  1n  1984,  as EPA  believes  that
the Federal  government  has   fulfilled  its   commitment  for   the  initial  funding
of these programs,  responsibility for which  should  now be assumed by  the States.

1983 Program

     A Congressional add-on  of $169,000 in Abatement,  Control  and  Compliance  will
be used to support environmental fellowships at 28 universities.

1983 Explanation of Changes from Budget Estimate

     The net increase of +169,000 results from the following action:

     -ConqTesslpnalAction. (+169,000)   The   Congressional  add-on  to  this  activ-
ity of = +l69,QdOto" ttie  Abatement,  Control,  and  Compliance appropriation was  for
academic training.

1982 Accomplishments

     In 1982, the  Agency  obligated  $168*400 under the  Abateinent, Control  and  Com-
pliance appropriation. These  funds  were used to  support environmental  fellowships
at 27 universities.
                                       WQ-59

-------
                                    WATER QUALITY

                       Water Quality Strategies Implementation

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE  -
                                           1983       1983             1984 VS  1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Dredge and Fill
 Salaries 4 .Expenses
 Abatement Control  &
 Compliance
Ocean Disposal  Permits
 Salaries & Expenses
 Abatement Control &
 Compliance
Environmental  Emergency
Response & Prevention
 Salaries & Expenses
 Abatement Control &
 Compl iance
Standards & Regulations
 Salaries & Expenses
 Abatement Control A
 Compliance
EPA Oil Spill Project
 Salaries & Expenses "

TOTAL:
 Salaries & Expenses
 Abatement Control &
 Compl iance

Water Quality
Strategies
Implementation
        52,466.5   $2,145.2   $2,334.3   $2,303.3
          $207.6     S344.9     5344.9     $344.9
                              -531.0
                       TOTAL   52,674.1   $2,490.1   52,679.2   $2,648.2    -$31.0
        $1,099.2   $1,223.4   $1,491.6   $1,793.2    $301.6
        $4,188.3   $2,343.2   $2,343.2   $2,203.2   -5140.0

TOTAL   $5,287.5   $3,566.6   $3,834.8   $3,996.4    $161.6
        $3,323.3   $4,030.9   $3,733-3   $2,939.6   -S793.7
        $2,196.0   $1,593.0   $1,601.0   $1,832.0    $231.0

TOTAL   $5,519.3   $5,623.9   $5,334.3   $4,771.6   -$562.7
        $2,787.6   52,839.9   $2,780.3   $3,853.9  $1,073.6
          $472.0     $339.2     $339.2     $865.3    $526.1

TOTAL   $3,259.6   $3,179.1   $3,119.5   $4,719.2  $1,599.7
            $1.9
TOTAL       $1.9

        $9,678.5  $10,239.4  $10,339.5  $10,890.0
        $7,063.9   $4,620.3   $4,628.3   $5,245.4
                              5550.5
                              $617,1
TOTAL  $16,742.4  $14,859.7  514,967.8  $16,135.4  $1,167.6
PERMANENT WORK YEARS
Dredge and Fill

Ocean Disposal Permits

Environmental Emergency
Response & Prevention

Standards 4 Regulations

EPA Oil Spill Project
68.3
23.4
78.4
55.3
24.3
82.3
55.3
33.3
82.3
52.3
31.4
62.6
-3.0
-1.9
-19.7
            58.3

              .1
55.9
61.6
75.9
14.3
                                      WQ-60

-------
                                    WATER QUALITY

                       Water Quality Strategies Implementation

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
TOTAL PERMANENT WORK YEARS


TOTAL WORKYEARS


Dredge and Fill

Ocean Disposal Permits

Environmental Emergency
Response & Prevention

Standards & Regulations

EPA Oil  Spill Project

TOTAL WORKYEARS
(DOLLARS IN THOUSANDS)

  228.5       217.8       232.5
   68.6

     .1

  256.5
                     222.2
69.3
                                             247.3
74.2
          262.3
90.1
                                                                   252.4
                    -10.3
74.1
29.7
84.0
58.2
29.1
90.7
58.8
38.9
90.4
54.7
39.5
68.1
-4.1
.6
-22.3
                     15.9
                                              -9.9
                                    WQ-61

-------
                                   MATER QUALITY


                      Water Quality Strategies Implementation
Budget Request
     The Agency requests a  total  of 516,135,400 and 222.2 permanent workyears  for
1984, an  increase  of $1,167,600  and  a decrease  of  10.3 permanent worlcyears.   Of
the amount requested, 510,890,000 will  be  for Salaries and Expenses  and 55,245,400
will be for Abatement, Control and Compliance.

Program Description

     The water  quality  strategies  implementation  subactivity  covers  Dredge  and
Fill, Ocean Disposal Permits, Environmental Emergency  Response  and Prevention,  and
Standards and Regulations.

     Dredge and Fill -- Major activities include  review  of individual   and  general
permits, preapplication consultation, activities  for  Section  404(c)  act-ions,  early
planning and  review  of  Environmental  Impact Statements,  Regional  assistance  to
States in planning  and  developing delegation  proposals,  as well as  assistance  and
oversight to States which have assumed the  404 Program.

     Ocean Disposal Permits -- The  ocean disposal  program includes the  regulation
of ocean disposal  by outfalls  and dumping, designation of disposal sites,  develop-
ment of  oceart disposal policies,  and participation  in  interagency  programs  that
deal with the  development  and protection  of  ocean resources.  The Agency's  ocean
disposal programs   are  authorized by  the  Marine  Protection,  Research  and  Sanctu-
aries Act (MPRSA)   of  1972  and the Clean Water Act, as amended,  and  are consistent
with the  Convention on  Prevention  of  Marine Pollution  by Dumping  of Wastes  and
Other Matter, known as the  London Dumping Convention  (LOG).

     To carry out  ocean disposal  permitting functions, the  Administrator of EPA is
authorized to  regulate  the  disposition of  all  materials except dredged material,
which is regulated  by the Corps  of Engineers  (COE),   MPRSA prohibits the transpor-
tation and dumping in ocean water of chemical, biological,  and radiological  warfare
agents and high level radioactive materials.  EPA has  statutory  responsibility  for
designating all ocean dumping sites, including those  for dredged material.

     Environmental Emergency Response and Prevention  — The objective of this  pro-
gram is to protect public  welfare,  property  owners",  and the environment  from  the
hazards associated  with  accidental  releases  of oil   and other  petroleum  products
to navigable waters  of the  United States,  as  mandated by Section  311  of the  Clean
Mater Act.   The  Agency  shares   responsibility  for this  program  with  the United
States Coast Guard,  which  addresses those  incidents in coastal  areas and the  Great
Lakes.

     Standards and Regulations — This program includes development and publication
of water quality criteria and standards regulations, and related guidance  pursuant
to Sections 303,  304(a) and 307(a)  of the  Clean Water Act.  EPA publishes  guidance
on criteria  for  water quality,  based  on  the latest  scientific knowledge on  the
kind and  extent  of  all  identifiable  effects  of  conventional  and  toxic pollutants
on human health and aquatic  life.  Protocols are developed to  provide  scientific
and technical guidance to  States on methods  for  developing criteria which  reflect
site-specific conditions.   EPA provides assistance to  the  States in  applying  these
protocols.  Assistance in the development  and review  of State  water quality  stan-
dards is  provided to  ensure that  attainable  uses  and  appropriate  criteria  are
established.   This program  also includes Clean Lakes  grant management.
                                        UQ-62

-------
DREDGEANDFill

1984 Budget Request

     The Agency  requests  a total  of  $2,648,200 and  52.3  permanent workyears  for
this program,  of  which $2,303,300 is  for  the Salaries and  Expenses  appropriation
and $344,900  is   for  the  Abatement,   Control  and  Compliance appropriation.  This
represents a  decrease  of $31,000  and  3.0  permanent workyears  from 1983  levels,
made possible by  increased efficiency  through  program reforms.

     The major focus  in  1984 will  be to  increase  State  involvement  in the  404
program, whether through program transfer or,  in some  cases, through  development of
a formal  role for  States  unable  to  accept  program transfer in  the  future.   In
addition, the  Agency  expects  to review "over 9,000  Section 404  permits  and  250
environmental impact statements with  dredge or fill  implications.

1983 Program

     In 1983,  the Agency  is  allocating a  total of  52,679,200 and  55.3  permanent
workyears to  this  program,  of which  52,334,300 is  for the  Salaries and  Expenses
appropriation and  $344,900  is  for the Abatement,  Control  and  Compliance  appro-
priation.  In  1983,  the Agency  expects to  complete work  on clarifying the  scope
of the  program.   Continued emphasis  is on State  404  program development, and  the
Agency anticipates  that several  States will  undertake  pilot programs  with con-
tinuing support  from  EPA.   EPA will  also complete  streamlining  requirements  to
facilitate additional   program  transfers to the  States.   EPA will  work to  expand
opportunities for  State involvement  in 404 activities.   In addition,  the  Agency
expects to  review over  10,000  Section  404  permits and  300 environmental  impact
statements with dredge or fill implications.

1983 Explanation  of Changes from B udget Estimate

     The net  increase of +$189,100 results  from the following action:

     - Rep rogrammi ngs.   (+$189,100)   During the  development of the  operating  plan,
severa 1 rsprogrammings  were  made to this activity which  are not  reportable  under
the Congressional  reprogramming  limitations.   These  changes  resulted  in  a  net
increase of +$189,100 to'the Salaries and Expenses  appropriation.

1982 Accomplishments

     In 1982,  the Agency  obligated  a  total   of  $2,674,100 for  this program,   of
which 52,466,500 was  for  the Salaries  and Expenses  appropriation  and $207,600  was
for the Abatement, Control  and Compliance  appropriation.   In 1982, the  404 Program
began development  and implementation  of  program  reforms  identified  by  the Vice
President's Task   Force  on  Regulatory  Reform,  including   program  delegation   to
States, streamlined procedural arrangements with the Corps  of  Engineers,  revisions
to the  Section 404(b)(l)  Environmental  Guidelines,  and  clarification  of  program
scope,  the major  emphasis  for the Dredge and  Fill  program was  State  404 program
development.  ^Program  development  .grants  were  made to  eight  States.   In  1982,
the program finalized the Section  404(b)(l) guidelines, as  well  as the  streamlined
procedural arrangements with  the Corps.i  In  addition,  EPA  initiated a  review of
the program in order to streamline requirements  for  transfer to the  States.   Other
accomplishments included  reviewing  over 10,000  Section 404  permits  and  over^SOO
environmental impact statements with  dredge or fill implications.

OCEAN DISPOSALPERMITS

1984Program Request

     The Agency  requests  a total  of  $3,996,400" and 31.4 permanent workyears  for
this program,  of  which $1,793,200 is  for  the Salaries and  Expenses  appropriation
                                        WQ-63

-------
and $2,203,200  is  for the Abatement,  Control  and Compliance  appropriation.   This
is an increase  of $301,600 for  Salaries  and  Expenses  reflecting  increased workyear
co.sts and  a  decrease  of  1.9  permanent  workyears.   The decrease  of S140.000  in
Abatement, Control and Compliance reflects the completion of court-ordered environ*-
mental impact   statements  and  consequent diminished site  designation  activity.

     The 1984 program  includes  the  revision  of the  ocean  dumping .regulation  and
criteria, which  will  provide a  more comprehensive, scientifically  supported  ocean
disposal program.  Activities scheduled for 1984 include  the following:

     PermitIssuance:  This  program  will  review, process,  and issue approximately
60 permit applications for  ocean disposal.  This activity  will  include  evaluating
and characterizing  all  waste samples  on  a  case-by-case basis.   EPA will  review
approximately 80 dredged material disposal permits, evaluate requests  by  the  Corps
of Engineers  for  waivers,   review  permit  applications, and  issue  research  and
special permits for incineration of wastes at sea.

     Site Designation:  This  program will  survey  three  potential  disposal  sites
for site destination purposes and eight  existing sites to determine the  impacts  of
dumping.  This  activity  will provide more refined scientific  information on  which
to base  site  designations^   Environmental Assessments will  be prepared  for  ocean
disposal sites.  The Agency  will designate new  ocean incineration  sites, evaluate
existing sites  through  compliance  monitoring,   and  initiate  criteria  development
for general incineration permits.

     Criteria Development:  This program  will  develop protocols and  specific  cri-
teria to be used to examine  the scientific  parameters for  the site  selection and
designation process  and  assessment  of permittee wastes. The Agency  will  examine
four NOAA predictive indices  which  measure environmental impacts  to  determine the
most relevant and  applicable indices  in regard to  ocean dumping.  These  indices
will be used  to revise ocean dumping  criteria  and methods   for  interpreting  them.
The methodologies will  be verified by field testing.  The  new ocean dumping criteria
will then  be  ready to be  used  as  tools  to  assess- "unreasonable  degradation"  and
"irreparable harm"  and to  scientifically determine  the acceptable  environmental
impact in a discharge or disposal area.

     User Fee System:  If appropriate legislation is  approved  by  Congress in  1983,
the Agency win  Implement a user fee system.  Permit  processing  fees would recover
the cost of reviewing permit applications.  User fees would  be collected to recover
costs related to designating sites  and   compliance monitoring for  industrial  and
municipal waste disposal,

     Guidance Development and Statutory Reports: The program  will  issue  guidance
on the  balancing of  environmental   and  economic  Impacts of  alternative disposal
options.  It  will  also issue an Annual   Report  to  Congress pursuant to  MPRSA and
the LDC.

1983 Program

     In 1983, the  Agency is  allocating  ,a total of  $3,834,800 and  33.3 permanent
workyears to  this  program,   of  which $1,"491,600 1s for  the Salaries and Expenses
appropriation and $2,343,200  1s for the  Abatement,  Control and  Compliance appro-
priation.  The  majority  of  the  extramural resources  are for  site  surveys, devel-
opment of environmental assessments, and site designation.

     Regu1atory/Legis1 atiye Actiy1ties;: EPA  will publish the  modification to the
final ocean dumping reguTation  to  imp 1 ement the City of New  York  decision and to
revise and  simplify  the  regulations.  EPA will  complete the  design of  a user fee
system, and propose legislation to the Congress.-

     Permit Issuance:  EPA will   review,  process, and  issue  approximately 50 permit
applications for  ocean  disposal.   This will  include  evaluating  and characterizing
                                       WQ-64

-------
all waste samples provided by facilities applying for permits.  The waste character-
istics will be examined  for  suitability  of  ocean  disposal  at existing sites on  a
case-by-case basis.  The  Agency  will  review  approximately  75  dredged  material
disposal permits, evaluate requests  by the  Corps  of Engineers for waivers,  review
permit applications, and issue research and special permits  for incineration  of
wastes at sea.

     Site Designation:   The Agency will survey  and monitor  eight  disposal  sites  to
determine impacts6T dumping,  including  more  refined  scientific  information  on
which to  base  site designations.   Environmental  assessments will  be prepared  on
ocean disposal  sites.

     Criteria Development:  The Agency  will  test  four  wastes  to determine  their
suitability for  ocean disposal,  and prepare  a  technical  guidance document  on the
application and  interpretation of  predictive assessment  techniques developed  in
the laboratory.  EPA will update the Section 403(c)  handbook for ocean  discharge
criteria to include additional  industrial  dischargers.

     Guidance Development and_ Statutory  Reports:  The  Agency  will   issue  program
guidance, appropriate controls,  and procedures for  the  Issuance  of  NPDE5 permits
for offshore oil  and gas and other offshore  industries.   This  activity will include
the development  of  a  data base to evaluate  the  impact  of oil and gas  drilling  on
receiving waters.   The  data base  will  establish  the basis  for the issuance  of
of general permits.  The Agency  will also initiate the development  of  guidance  on
the balancing of  environmental  and economic impacts of alternative  disposal options,
and issue the Annual Report to Congress  pursuant to MPRSA and LDC.

1983 Explanationof Changes from Budget  Estimate

     The net increase of +$268,200 results from the following actions:

     -CoriQressiona1 Action.  (+5247,600)   This increase  includes  +3247,600  of the
$10.5 million Salaries  and Expenses  add-on  which supports  the 480 additional  per-
manent full-time  workyears provided to the Agency.

     -Reprogramminc|s.   (+$20,600)   During the development  of the operating  plan,
severalreprogrammTngs  were  made  to this  activity  which  are  not  reportable  under
the Congressional  reprogramming limitations.   These  changes resulted   in  a net
increase of +520,600 to the Salaries and  Expenses appropriation.

19|2 Accompl i shments

     In 1982 this  program  obligated 55,287,500.    Of  this  amount,  51,099,200 was
for the  Salaries  and  Expenses  appropriation and  $4,188,300 for  the  Abatement,
Control  and Compliance  appropriation.  This  included support for surveys  of ocean
disposal sites,  the development  of  court-ordered  Environmental   Impact  Statements
(EISs), and site  designation.  The program accomplished the following.

     Regu 1 atory/Legi si af.1 ve Activj ties:   EPA  initiated the  revision  of the  ocean
dumping regulation  in response to  a  1981  decision  of United  States  District Court
for the  Southern District of  New York, which ruled that the Agency  must consider
the comparative  risks  of  land- versus  ocean-based disposal  before  precluding  the
use of the  ocean medium.  The  review  of  the  ocean dumping regulation focused  on
the development  of  waste characterization and on basic physical measurements.   EPA
also conducted analyses  on  the feasibility and  content  of a   user fee  sys'tem.

     Permit Issuance:   The Agency reviewed,  processed, and  issued 38 permit appli-
cationsfor  ocean  disposal  and  reviewed 81 Corps  of  Engineers  dredged  material
disposal permits   for  environmental  considerations  pursuant  to  MPRSA.    EPA  also
issued one research permit for Incineration  at sea.
                                       UQ-65

-------
     Site Designation:  During  1982  EPA  produced EISs  designating  three  dredged
material disposal sTtes for Corps  of Engineers  projects, an  ocean  dumping  site for
municipal sewage  sludge  disposal,  and  a  site for incineration  of wastes at  sea.
The Agency worked with NOAA  to collect and analyze  data related to ocean  dumping,
especially for use in designating  suitable sites,  for  ocean  industries  operations,
and for monitoring existing sites.

     Guidance Development and Statutory Report:   EPA  issued   an  Annual  Report  to
Congress pursuant to  MPRSAandIDC,issueddraft program  guidance  and  appropriate
controls and procedures for the issuance  of NPDES permits  for  offshore  oil and gas
and other offshore  industries, and updated the  Section  403{c) handbook for  ocean
discharge criteria to include additional industrial dischargers.

ENVIRONMENTAL.EMERGENCY RESPONSE AND PREVENTION

19J4 Program Request

     The Agency  requests  a total  of $4,771,600  and  62.6  permanent  workyears for
this program, of which $2,939,600  will  be for Salaries and Expenses and $1,832,000
will be  for  Abatement,  Control,  and   Compliance.   This  reflects  a decrease  of
$793,700 and  an  increase  of $231,000  respectively.  The  net  decrease  of  $562,700
reflects the  decreased need for a Federal role as States gain experience.

     The Agency has a 24-hour  capability  to respond  to notifications of accidental
spills or  threat of  releases.  Federal  removal  is   directed  at   major  incidents
where the responsible party is unidentifiable, refuses to clean up, or is incapable
of providing timely and adequate removal and where the States and local  authorities
lack the necessary expertise, equipment, or funding.

     Spill notifications will  be processed to determine what, if  any,  response is
required.  Response  operations will  be  directed  at  120  major spills  to  ensure
adequate response.   Regions  will  respond on-scene  at 400  removals conducted  by
responsible parties  or State  and  local  authorities  to  ensure  adequate  response.

     Removal by  responsible  parties  and  State  and local   governments is  also mon-
itored by the Agency  to ensure that  the response is  adequate.   Federal  regulations
require the  implementation  of a  Spill  Prevention,   Control,  and  Counter-measure
(SPCC) plan at oil storage facilities  and transfer points  that could reasonably be
expected to spill a significant amount  of oil  into the waters of the United States.
Regional staff,  with  assistance   from  contractor  personnel,  conduct  compliance
inspections at  selected  non-transportation-related  (NTR)  facilities included  in
the SPCC program, In an effort to  reduce  the  frequency and volume  of releases that
occur.

     The Agency  also maintains  an  Environmental  Response  Team (ERT)  to  provide
Regional and  State   personnel  with  response  training and  on-site  technical  and
operational assistance at complex emergency incidents.   The  ERT  is  staffed  by
personnel with a high degree of expertise 1n  the areas of spill control and removal,
spill sampling and analysis techniques, and damage assessments.

     Regional response capability  1s  augmented  through  the Technical  Assistance
Team (TAT)  contract.   This  contract  provides  contractor  workyears  to  assist
Regional staff and the ERT  in responding  to  Section  311  spills and environmental
emergencies.

     An estimated 2,000 Spill  Prevention  Control and Counter-measure  (SPCC)  inspec-
tions will be conducted at  non-transportation-related facilities.   The Environmen-
tal Response Team will have the resources and expertise to provide  special  on-scene
advice at unusually complex spills.
                                        WQ-66

-------
19.83 Program

     In 1983,  the  Agency is  allocating  a total  of  $5,334,300 and  82.3  permanent
workyear.s to  this  program,  of which  $3,733,300 is for  the  Salaries and  Expenses
appropriation and 51,601,000  is  for extramural  purposes  under the Abatement,  Con-
trol, and Compliance appropriation.

     The Agency  is  maintaining   its  field  response   program.   Headquarters  will
ensure overall management of  the program and the  Regions  will be  responsible  for
managing response  actions.  The  oil  component  of the Environmental  Response Team
will provide special engineering and technical  advice  at  an estimated 10 incidents.
Regional personnel  will  be  available on  a 24  hour basis to respond  to  the  estim-
ated 7,000  notifications  received  by the National Response  Center  of  accidental
releases of  oil  and other  petroleum  products.   The  Agency  will  respond  on-scene
at 400  removals  undertaken  by  responsible parties or State/local  authorities  and
will direct  removals  at 120 major  oil  incidents.  An estimate 2,000  SPCC inspec-
tions will be conducted at NTR facilities.

1983 Explanationof Changesfrom Budget Estimate

     The net decrease of -$289,600 results from the following action:

     -Reprogramniings.  (-5289,600)  During the  development of the  operating plan,
several repro'granutri ngs were  made to this activity which are  not reportable under
the Congressional  reprogramming  limitations.   These   changes resulted  in  a  net
decrease of  -$297,600  to  the  Salaries   and   Expenses  appropriation  and  a   net
increase of  +$8,000  to  the  Abatement,  Control  and  Compliance   appropriation.

1982 AcconipHshments

     In 1982, the Agency obligated a total of $5,519,300 for this  program,  of which
$3,323,300 was for  the  Salaries  and Expenses appropriation and $2,196,000 was  for
extramural purposes  under the  Abatement, Control, and  Compliance  appropriation.
The Agency's Technical Assistance  Team  contract provided 20  contract workyears to
assist Regional  staffs  in directing  removals at  120  major oil spills,  responding
on-scene at  450 non-Federally-funded  incidents,   and  conducting over 1,700  SPCC
inspections at NTR  facilities.   In addition, Regional  offices received and screen-
ed over 7,000 notifications  of oil spill   releases.

STANDARDS AND REGULATIONS

1984 Program Request

     In 1994, the  Agency  requests a  total of  54,719,200 and  75.9  permanent work-
years.  This amount will include $3,853,900 for the Salaries and Expenses appropri-
ation and $865,300  for  the  Abatement, Control  and Compliance appropriation.  This
is an increase  of  $1,073,600  and 14.3 permanent workyears  in Salaries and Expenses
and an  increase  of $526,100  in  Abatement,  Control  and  Compliance.  The  increase
reflects additional  work in  the  Regions to provide  technical  assistance  to  the
States in  interpreting  and implementing  procedures  to  define water quality  cri-
teria.  The  criteria  are incorporated by the  States  in  their water  quality stan-
dards.

     No funds  are   requested  for management  of Clean Lakes   grant  projects. . The
Agency expects  to  complete  all  remaining Clean Lakes grant  projects in  1983,  or
that the  States  will  assume these  responsibilities due  to  the local  nature  of the
projects.

     Water quality  standards   are  the basis  for  establishing pollution  abatement
efforts needed  to  maintain  and  enhance  ambient  environmental  conditions  in  the
Nation's waters.   In 1984,  the Agency will de-emphasize  national  criteria develop-
ment activities, which  are  nearing completion.   The program  will work  to increase
                                        wn-67

-------
State flexibility to  set  economically  and environmentally  attainable  standards
and in  the  application  of procedures  to  set  criteria  at  levels  which  reflect
local environmental   conditions.   The  Agency  will  implement the  final  rule on
water quality  standards  and will  field test and  revise guidance  to reflect the
development of  new  or  refined procedures  for  setting water  quality  standards.

     These procedures cover  the analyses  of environmental   factors  affecting the
designated uses of water bodies.  The Agency will  adapt, test, and  validate proto-
cols to develop site-specific criteria  for water bodies,  and will  assist the States
in the use of  these  protocols.   EPA will also  review State-initiated  revisions to
current water quality standards and assist the  States in resolving inconsistent or
incompatible water  quality  standards   on  interstate   and   international   waters.

     Headquarters will  evaluate Regional  and State  water quality  standards  programs
for application of new policies, and develop and field  test technical  guidance and
site-specific criteria  and standards for estuaries and  marine waters.   Assistance
will be provided  to  the  States to  modify  and  adapt freshwater  protocols  for use
on marine waters.

     The Agency will also  continue  to  examine  and  improve the scientific  basis of
the criteria guidance issued under Section  304(a)  of the CWA, and develop specific
criteria to be  used as  a  basis for modifying  the Section   307(a) toxic  pollutant
list.  The Agency will also  refine  toxicological testing procedures  for pollutants
arising from dredge  and fill  activities.

1983 Program

     In 1983, the Agency is  allocating  a  total of  $3,119,500  and  61.6  permanent
workyears for  this  program,   including  $2,780,300  for  Salaries   and Expenses and
$339,200 for Abatement, Control and Compliance,  Major  accomplishments  planned for
1983 include the  promulgation of  a revised  water quality   standards  regulation,
field testing the use  of guidance  on  setting  water quality  standards,  assistance
to the States in  applying  site-specific criteria procedures, development  of  site-
specific criteria for estuaries and marine  waters, and the transfer  of  Clean  Lakes
Program responsibilities  to State  and  local  agencies.

     Program objectives  include assisting  the  Regions  in  reviewing  State-adopted
standards and in resolving questions of  inconsistent or  incompatible water quality
standards on  interstate  and  international  waters.   The   Agency   will   continue
work to develop  criteria  for  making  recommendations  on the toxicity  of  various
pollutants on  aquatic  organisms,  and  will  continue   to  improve  the  scientific
basis of the criteria guidance.   In  addition the Agency is   formulating  and making
action recommendations on  the modification  of the  Section  307{a)  list  of  toxic
pollutants.   EPA  will  propose  appropriate revisions  to  the   Section  404{B)(1)
dredge and fill  guidelines to comply  with  instructions from the President's  Task
Force on Regulatory  Reform.

     During the  last year  of Clean Lakes  management,  the  Agency will  review and
approve grant applications  for  the completion  of  existing  lake  restoration  proj-
ects, and will  continue  the  transfer  of Clean Lakes  Program responsibilities to
the States.

1983 Explanation of  Changes from Budget Estimate

     The net decrease of  -$59,600  results from  the  following actions;

     -Congressional  Action.  (+$50,800)   This  increase  includes  +$50,800 of the
Salaries and Expenses add-on which  supports the 480 additional permanent  full-time
workyears provided to the Agency.
                                        WQ-68

-------
     -Reprogrammings.  (-5110,400)   During the  development  of the  operating  plan,
several reprogr amitiirigs were  made  to this activity which  are  not  reportable  under
the Congressional  reprogramming limitations.   These  changes  resulted  in  a  net
decrease of -$110,400 to the Salaries  and Expenses  appropriation.

1982 Accomp11 shments

     In 1982,  the  Agency obligated $3,259,600  and  58.3  permanent workyears.   Of
this amount 52,787,600 was for the Salaries and  Expenses  appropriation  and  $472,000
for the Abatement,  Control  and Compliance appropriation.   The contract  resources
were used  to  review pollutants on  the  Section 307(a)  list,  to  prepare  criteria
documents, develop and field test  site-specific  water quality  criteria  modification
procedures, test  toxicity  procedures  for  dredged  material,  prepare  a  proposed
water quality  standards  regulation, assist  Regions  and  States  in conducting  use
attainability analyses,  and in determining  the  economic attainability  of  water
quality standards.

     The program also  developed the revisions to the water quality standards  regu-
lation, assisted States in conducting nine case studies  on use attainability  guidance
to reevaluate  existing stream uses by  considering the environmental  and  economic
impact of established uses,  and  developed site-specific criteria development method*
ology for  field testing  and  application in  15 States.   The  Agency   continued  to
develop criteria for making recommendations on  the toxicity of eight pollutants  on
aquatic organisms.

     EPA Headquarters  assisted  Regions in reviewing  State adopted  standards and in
resolving inconsistent standards involving interstate and international  waters.   The
Agency reviewed  environmental  status   of estuaries  in  relation  to their  economic
importance as  a national  resource.   Additional  work  included  publication of  an
Advanced Notice  of Proposed Rule Making  (ANPRM) to  identify  alternative approaches
to the  Section 404(B)(1) drsdge  and  fill guidelines  to comply  with  the  program
reforms recommended by the President's Task Force  on Regulatory Reform.

     EPA also  provided technical   review for  30  Clean   Lakes  project  completion
requests and awarded  grants to 25 existing implementation projects, and continued
the transfer of  Clean Lakes  Program  responsibilities  to the  Regions  and  States.
                                       UQ-69

-------
                                    WATER QUALITY

                         Water Quality Monitoring & Analysis

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 VS  1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Water Quality
Monitoring & Analysis
 Salaries & Expenses           $7,566.4   $8,791.7   $8,516.7   $7,896.3   -S620.4
 Abatement Control 4             S634.5     $375.7     $345.1     $595.1    $250.0
 Compliance
                       TOTAL   $8,200.9   $9,167.4   $8,861,8   $8,491.4   -$370.4

TOTAL:
 Salaries & Expenses           $7,566.4   $8,791.7   $8,516.7   $7,-896.3   -$620.4
 Abatement Control &             $634.5     S375.7     $345.1     $.595.1    $250.0
 Compliance

Water Quality          TOTAL   $8,200.9   $9,167.4   $8,861.8   $8,491.4   -$370.4
Monitoring & Analysis


PERMANENT WORKYEARS
Water Quality                     154,2      140.6      140.3      134.3      -6.0
Monitoring & Analysis

TOTAL PERMANENT WORKYEARS         154.2      140.6      140.3      134.3      -6.0


TOTAL WORKYEARS
Water Quality                     186.2      181.0      181.2      173.9      -7.3
Monitoring & Analysis

TOTAL W.ORKYEARS                   186.2      181.0      .181.2      173.9      -7.3
                                      WQ-70

-------
                                   WATER QUALITY


                       Water Quality Monitoring and Analysis
Budget Request
     The Agency requests $8,491,400  and  134.3 permanent workyears for 1984,  a  de-
crease of $370,400  and 6.0 permanent workyears  from 1983.   This  request  includes
57,896,300 for the Salaries and  Expenses appropriation  and  $595,100  for  extramural
purposes under the Abatement,  Control and Compliance appropriation.

Program Description

     This subactivity  develops  water quality  monitoring strategies,  systems  and
procedures used to  identify the  biological  and chemical measures  of  environmental
quality.  These measures are necessary for assessing local water quality  and deter-
mining cost-effective  measures  required  to  meet local  water quality objectives.
These are primarily State activities, supported by EPA.   They Include  water quality
sampling and analysis to identify water quality problems, their causes and  relative
severity and  technical  studies  to  support the  water quality management  program,
including use  attainability  analyses.    Throughout,  the  program  emphasizes  the
effective use of local, State, and Federal  resources  for collecting,  analyzing  and
interpreting monitoring data.

     The program develops procedures  to  assist the States  in using  water quality
data in technical analyses  including total  maximum daily loads  (TMOLs)  and waste-
load allocations  (WLAs).   These  analyses  support  the  development  and  implemen-
tation of  specific  discharge  effluent  limitations  and controls.   This  approach
ensures that pollution  controls  necessary to  meet  local  water  quality  objectives
are applied in permits issued to industrial  and municipal dischargers.

     This program also manages  national  efforts  to perform  environmental  benefit
assessments of water  regulations  and standards for inclusion in Regulatory Impact
Analysis (RIAs) and  for fulfilling  related requirements of  Executive  Order 12291.
This includes technical evaluations  of  the environmental exposure and risks  asso-
ciated with the presence of key pollutants in surface waters.

     Similarly, the  program provides  national  guidance  and technical  assistance
for State  efforts  to  analyze and report  on  their water quality and to  identify
priority problem  areas and  needed   State  action to  implement   required controls.
These efforts  also  serve as  an  Important source  of  information on  water quality
and program planning  for  the  State  continuing  planning process (CPP) as  required
under Section  303(e)   of  the  Clean  Water Act  (CWA).   EPA's responsibility  under
Section 3Q5(b) is  to  consolidate the information  provided  by  the  States into  a
national water quality report which  discusses  water quality  as well as  national
program management trends.  The program provides user technical  assistance  for  ADP
systems used to manage State  and EPA water quality information  for these  types of
analyses.

WATER QUALITY MONITORING AND ANALYSIS     :  .

1984 P rogram Request

     In 1984, the Agency  requests a  total of $8,491,400 and 134.3 permanent work-
years for  this  program,  of  which   $7,896,300  is  for  the  Salaries  and  Expenses
appropriation and $595,100 is for the Abatement,  Control and Compliance  appropria-
tion.  This is a decrease of  $620,400 in Salaries and Expenses  and an increase of
$250,000 in  Abatement, Control  and  Compliance.   The  decrease  of  6.0 permanent
workyears reflects a  reduction in Regional  resources  to assist  States in  revising
their continuing planning processes  and  monitoring programs.  The majority  of  the
                                         WQ-71

-------
States will have  completed  this  work in 1983.  The  increase reflects  support  for
the water  quality  based  approach,  specifically  for the  development   of TMDL/WLA
guidance.  Major accomplishments  planned for 1984  include the following.

     EPA will  prepare an  annual  update  of  program guidance for monitoring and  for
preparation of total maximum daily loadings  and waste load allocations  (TMDL/WLA).

     The program will continue its  development of technical guidance documents  to
support the water  quality-based  approach (developed in  concert with EPA  Regional
offices, other Federal  agencies,  States, and  industry  and  environmental  groups).
These documents  include:  priority  waterbody  identification and ranking;  improved
screening techniques  for States  to  follow  In   setting  priorities; step-by-step
user guidance for  TMDLs  and WLA  models; local cooperative sampling and  analysis
programs; quality assurance; and  measurement of water quality results.   The program
will also  issue  updated guidance  describing  the  relationship  between  Section
303(d) waterbody priorities  and  key  annual  program priorities.  Technical   infor-
mation on biological screening techniques will  be made  available for States  to  use
in setting priorities.

     The program will  also  develop a step-by-step user guidance  for applying  the
WLA models  developed  by  ORD  and contractors  so   they  can  be  used under varying
site-specific conditions. The Agency  will  evaluate variability of  selected  treat-
ment processes and develop guidance for  incorporating results in WLA calculations.
A data base for  WLA parameters will  be  assembled  (e.g.,  decay  rates, temperature,
pH, alkalinity)   and model  limitations   evaluated in  order to provide practical
technical guidance for key steps  in the  TMDL/WLA process.

     A program  for State assistance  in  conducting WLAs  and TMDLs will be  estab-
lished.  Consultation assistance to all   States will  be  continued and direct  assis-
tance on  specific  sites  will be  initiated  where   requested by  about 10 States  in
order to  contend  with   complex   or  controversial  situations.   Assistance will
continue to focus  primarily  on conventional  pollutants,  with an initial effort  on
toxic pollutants  in some areas.  An additional   16 States  will   be   assisted  in
revising their  continuing planning  processes to  reflect  the   need for  improved
monitoring and WLAs  in  State programs.   Assistance  will  be granted to States,  as
requested, to help coordinate local  cooperative monitoring programs.

     The Regions will  review the water  quality  justification  for  advanced  treat-
ment construction  grants  projects.   Included in this review will   be 132  projects
smaller than $3,000,000  in  size.   An  evaluation of the  water quality justification
of approximately  20 advanced treatment projects, over $3,000,000  in  cost, will
also be conducted  in Headquarters.   The monitoring data and ambient water quality
analyses supporting  State  proposed   water   quality  standards  revisions  will   be
reviewed.

     Other activities include technical  assistance  to  States   in  performing  water
quality analyses  for  the States' 1984  Section 305(b)  reports, development   of  an
initial strategy  for marine  and estuarine  monitoring  activities,  and assistance
to approximately 25 States in using the STORE! System to support the water  quality-
based approach.

1983 Prog_ram

     In 1983, the  Agency is allocating  a  total  of  $8,861,800  and 140.3 permanent
workyears for this  program,  of  which $8,516,700  is  for the Salaries and  Expenses
appropriation and  $345,100  is for  the Abatement,   Control  and Compliance appropri-
ation.  A major  focus  in 1983 is  the continued development and implementation  of
a water monitoring  program  which  will improve and upgrade  water quality data col-
lection, analysis,  and  reporting for the   States  in order to  define  uses.  Addi-
tionally, EPA  is  assisting  in  developing  supporting  water  quality criteria  and
standards and will ultimately measure the results  of  clean-up programs.
                                        WQ-72

-------
     EPA is proposing  and promulgating basic  regulations  governing water  quality
monitoring, priority  waterbocjy  identification,  conduct  of  total   maximum  daily
loads and  waste!oad  allocations,  and other  components  of the water  quality-based
approach, implementing Sections 303(d)  and 303(e) of  the CWA.

     As a  step  toward developing a  monitoring strategy  for  marine and  estuarine
waters, the program is evaluating existing marine and estuarine monitoring programs
and sampling and analysis protocols.

     To improve State monitoring  programs,  EPA is  assisting States  as they  revise
their continuing planning processes.   Efforts  will  focus  on  improving biological
monitoring efforts and  on  redirecting  fixed  stations  to  collect  data  needed  to
support water quality  decisions.  EPA  will  also  develop  guidance  for applying
biological principles in  specific Regions  and  States (based upon the Aquatic Life
Survey conducted in 1982).

1983 Explanation of Changes from Budget Estimate

     The net decrease of -$305,600 results from the following  action:

     -Reprggra'nmings._  (-$305,600)  During  the development  of the  operating  plan,
severa 1 r ep r og r ammi h gs were  made  to  this activity which  are  not reportable  under
the Congressional   reprogramming  limitations.   These changes  resulted  in  a  net
decrease of -1275,000 to the Salaries and Expenses  appropriation  and a  net decrease
of -530,600 to the Abatement, Control and Compliance  appropriation.

1982 Aceomp1i shments

     In 1982,  the  Agency  obligated $8,200,900.  Of this amount  $7,566,400  was  for
the Salaries and Expenses appropriation and 5634,500  was for the  Abatement,  Control
and Compliance  appropriation.   Major accomplishments included the issuance  of  the
Aquatic Life Survey, a  statistically  based survey  of the  aquatic life  (fisheries)
in U.S. flowing waters, and completion of the Section 305(b) report.

     Additional  accomplishments  included  analysis  of toxic  pollutant  samples  In
order to  evaluate  exposure,  fate, and effects  of priority  pollutants.  Emphasis
was placed  on  evaluating  specific  geographic areas  ("hot  spots")  with  projected
toxii pollutant problems.

     The program issued a basic user-oriented program guidance for water monitoring
and for  conducting TMOLs/WLAs  as an aid  to States   in updating their continuing
planning process under the water quality management regulation.

     The monitoring  program  also evaluated  the  water  quality benefits  for  15
advanced treatment  projects,  Issued  policy  guidance  to States   for   preparing
biennial Section 305(b)  reports,  and operated and  maintened the STORET System  for
600 users in Regions, States and other Federal  Agencies.
                                        WQ-73

-------
                                    WATER QUALITY

                               Municipal  Source Control
         ACTUAL   BUDGET
          1982    ESTIMATE
                    1983
                                                    CURRENT   ESTIMATE  INCREASE +
                                                    ESTIMATE    1984    DECREASE -
                                                      1983             1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Municipal Waste
Treatment Facility
Construction
 Salaries & Expenses
 Abatement Control &
 Compl t'ance
Corps of Engineers
 Abatement Control &
 Compliance
Waste Treatment
Operations &
Maintenance
 Salaries & Expenses
 Abatement Control 4
 Compliance
NEPA Compliance -
Municipal Wastewater
Treatment Facility
Construction
 Salaries & Expenses
 Abatement Control &
 Compliance
TOTAL:
 Salaries & Expenses
 Abatement Control &
 Compliance

Municipal Source
Control
       $16,430.4  $14,291.2  $16,380.8  $15,296.9  -51,083.9
        $3,614.3   51,904.4   $4,529.6   $2,054.4  -$2,475.2

TOTAL  $20,044.7  $16,195,6  $20,910.4  $.17,351.3  -$3,559.1


       517,452.5  $17,387.4  $20,187.4  516,000,0  -$4,187.4

TOTAL  $17,452.5  $17,387.4  $20,187.4  516,000.0  -$4,187.4
        $1,258.5   SI,693.9   51,419.6   $1,363.9     -S55.7
          $203.6

TOTAL   $1,462.1   51,693.9   51,419.6   $1,363.9     -555,7
     '   52,993.9   $2,282.1   $2,606.2
        53,374.5   $6,210.6   56,210.6

TOTAL   $6,368.4   $8,492.7   $8,816.8
                             -S2.606.2
                             -56,210.6

                             -58,816.8
       $20,682.8  $18,267.2  $20,406.6  $16,660.8  -$3,745.8
       524,644.9  525,502.4  530,927.6  518,054.4 -512,873.2
TOTAL  $45,327.7  $43,769.6  $51,334.2  $34,715.2 -516,619.0
PERMANENT WORKYEARS
Municipal Waste
Treatment Facility
Construction

Waste Treatment
Operations &
Maintenance
           422.8
            31.9
331.7
 37.4
352.6
 36.0
323.3
 35.4
-29.3
  -.6

-------
                                    WATER QUALITY

                               Municipal  Source Control

                                ACTUAL   BUDGET     CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE -
                                           1983       1983              1984 VS 1983
NEPA Compliance -
Municipal Wastewater
Treatment Facility
Construction

TOTAL PERMANENT WORKYEARS
(DOLLARS IN  THOUSANDS)

   82.0       67.0       67.0
-67.0
  536.7       436.1       455.6       358.7     -96.9
TOTAL WORKYEARS
Municipal Waste
Treatment Facility
Construction

Waste Treatment
Operations &
Maintenance

NEPA Compliance -
Municipal Wastewater
Treatment Fadl ity
Construction

TOTAL WORKYEARS
  492.6      400.1       414.9       395.0     -19.9
   32.7       39.0       38.1        36.0       -2.1
   85.0       67.0       69.5
-69.5
  610.3      506.1      522.5       431.0     -91.5
                                      WQ-75

-------
                                   WATER QUALITY


                              Municipal  Source Control
Budget Request
     The Agency requests a  total  of 334,715,200 and 358,7 permanent workyears  for
1984, of which  $16,660,800 is under  the Salaries  and  Expenses appropriation  and
$18,054,400 is under the Abatement,  Control  and Compliance appropriation. This  is
a decrease of S3, 745, 800 in  Salaries and Expenses, $12,873,200 in Abatement, Control
and Compliance, and  96.9  permanent workyears,   These  decreases primarily  reflect
progress in  delegating  the construction  grants program  and the  the  transfer  of
NEPA compliance resources  to the Interdisciplinary  medium.

Program Description

     This program  provides  resources  for management  of most  of  the  Construction
Grants program, including direct program management and project  management  related
activities not delegated to States.

     Since 1977,  EPA has   negotiated  Section  205(g)  delegation  agreements  with
most States to provide  for phased transfers of  authority  and  responsibility    By
the end  of 1984,  a  total  of 49  States are  expected to  have signed  delegation
agreements with 36 of these considered fully  delegated.

     EPA will  continue  to  exercise  project  management responsibilities  in the  re-
maining nondelegated  and partially  delegated States  and  Territories;  to maintain
Federal responsibilities for ensuring effective, orderly use of  construction  grant
funds; to  ensure  program  accountability in  meeting statutory  goals;  and to  work
with the  States  in  implementing results-oriented  program management.   With  the
continuing assistance of the U.S  Army Corps  of Engineers in priority  construction
management activities,   EPA is continuing  to reorient  its  role  and  resources  to
overall program  management,  State   training,   and  State   management   assistance.

     For budgetary purposes,  Construction  Grants  Program  Management   is  divided
into the following four program elements:

                               Facility ^Construction — This program includes  most
       ._.__
of the day-to-day  management activities  associated  with  the  Construction  Grants
program in Headquarters and Regional Offices.

     Corps of Engl neers — This program  covers  a range of  construction  management
related activities assigned to  the  Corps of Engineers under an  interagency  agree-
ment to assure the technical and fiscal  integrity of  waste  water treatment project
construction.  It includes only Abatement, Control  and Compliance resources suppor-
ting the agreement.

    Waste T rea tmervt Ope r at 1 ons and Maintenance — This program  involves development
of State programs 'to ensure that Pub! i cly  Owned  Wastewater Treatment  Works (POTWs)
meet effluent requirements during their  first year of operation.   It  also provides
construction grants program support in  implementing  the Agency's  National  Munici-
pal Policy.

    NEPA Compliance- Municipal Mastewater Treatment Facility Construction — EPA is
responsible for preparing its  own Environmental  Impact Statements (EISs!  or,  alter-
natively, determining  findings  of  no  significant  impact  on municipal  wastewater
treatement grant  actions  to assure  that new  facilities with  Federal funding  are
planned,  constructed, and  operated  pursuant to  Section 511  (c) of the Clean Water
Act and the National Environmental  Policy Act  (NEPA).  These activities and support-
ing resources for  1984 are combined with New  Source EIS Preparation  and  appear in
the Interdisciplinary medium.
                                       HQ-76

-------
MUNICIPAL WASTE TREATMENT FACILITY CONSTRUCTION

1984 Program Request

      In 1984, the  Agency  requests 317,351,300 and  323.3 oermanent workyears  for
this activity, including $15,296,900 under the  Salaries  and  Expenses appropriation
and 32,054,400  under  the  Abatement,  Control,  and  Compliance appropriation.   The
decrease of 29.3 permanent workyears and  53,559,100  primarily  reflects  reduced EPA
staffing needs due  to program  delegation  to  the States.   In addition, the  Agency
is not  requesting  1984  resources  for  Headquarters  Advanced Treatment  project  re-
views, which  had been added  to  the  Agency's  1983 budget by the Congress; the  Agency
will operate these responsibilities within the requested level.  Finally/the  Agency
if not':, requesting   funds to xbe  allocated to  States and  institutions  :to support
development of training  of local personnel ici the 'operation  of murticipal  treatment
facilities.  This training h.as  promoted  State  self-sufficiency and  improved  muni-
cipal treatment facilities compliance.

     With a proposed 1984 construction grants appropriation  of  52,400,000,000,  EPA
expects to award 597  grants  resulting  in  4,764 active projects at year's  end. App-
roximately 1,200 projects  are  expected to complete  construction during  the  year.

      Of the 49  States  (including Puerto Rico)  with signed delegation agreements
expected in 1984, a total  of 36 States will   be fully delegated  (including" assist-
ance provided by the  Corps of Engineers), an  increase of 20%, or six, over  1983.
The Agency expects  this  level  of delegation  to continue  essentially  unchanged  for
the near future. Based on  this  assumption, the  program may be  considered  as  essen-
tially fully delegated.  In 1984, States will  provide 2,140 workyears  or 68%  of the
total management staffing, the  Corps of Engineers 14% and EPA 18%.

     With these resources, EPA  will exercise project management-related  responsi-
bilities in the remaining  nondelegated States and Territories.  EPA  will  also work
with the States in  targeting  construction grants  funds to priority  water quality
needs; selecting appropriate technologies; assuring  that plants are within communi-
ties' financial  capabilities and have the capacity  for-becoming  self-sustaining;
completing and  closing  out  projects  as  quickly  as  possible;  ensuring  effective
facilities construction;  ensuring orderly grant obligations and  outlays; and con-
ducting shared EPA,  State, and  Corps of Engineer activities.

      Using a number of  water quality-related data bases and computerized analytic
capabilities developed in  1982  and 1983,  EPA will   work with  States to  implement
comprehensive, systematic,  water quality  based approaches  for  identifying  con-
struction needs,  improving priority  11st development,  and making  water quality
needs based funding  decisions.

     Since 1976, EPA's value engineering  requirements have resulted in savings of
over S235 million.   In 1984,  EPA will  issue consolidated value  engineering guidance
emphasizing life cycle  and energy  cost  considerations.   Regions will  review  132
proposed Advanced Treatment (AT1) projects, referring those with over  S3 million in
incremental  costs to Headquarters for  review and concurrence.  Based upon oerfor-
mance and cost  evaluations of  existing  AT  facilities,  EPA  will   issue policy  and
accompanying guidance  on selection  and^use of appropriate,  cost-effective AT tech-
nologies.  Through  1982,  EPA  saved S826,000,000  through the  AT review process.
EPA will also  work with  States  and municipalities  in  developing  procedures  to
ensure that they are able to plan, construct, and operate self-sustaining  treatment
works.

     The innovative  and  alternative technologies program will continue its emphasis
on delegation to  States  and implementation  of a technical  information  system to.
assure quick  utilization  of advances  in  technology.  Increased  emphasis will  be
placed on  use  of   field  testing  and post-construction evaluation  of  operating
projects.  Major design,  process,  or operations and  maintenance problems will  be
                                      WQ-77

-------
Identified and  solutions  suggested;  a  clearinghouse will be  established  to  ensure
design feedback to  engineering  firms,  States,  and  municipalities.   EPA will  work
with States  and municipalities  in  resolving  sludge management problems  using the
multimedia sludge  management  guidance developed  in 1983,  including  selection  of
appropriate technologies.   Field assistance will  continue to be provided  to small
communities on  treatment  and  collection  alternatives  and small  flows  management.
Construction grants guidance documents will be updated as needed  to continue  imple-
menting the 1981 Amendments   EPA will  eliminate all remaining backlogs by closing
out approximately 1,500 projects.  EPA will also ensure that project completion and
audit resolution  backlogs  do not  recur  and  will  continue to  resolve audit  ex-
ceptions within six months of audit completion.

     EPA, with the Corps of Engineers,  will also continue efforts  to ensure project
integrity and prevent waste,  fraud,  or abuse.  EPA will  conduct  approximately 125
evaluations of  major  projects under  construction to  minimize potential  for  con-
struction and operations problems and, in  conjunction  with  other  offices,  investi-
gate allegations or evidences of waste, fraud, or-mismanagement,  taking  appropriate
corrective actions.

      The construction grants program will evaluate waste water treatment  needs in
communities which have received  Section  301(h)  marine discharge waivers to  review
current and proposed construction and identify necessary changes.

1953 Program

      In 1983,  the Agency  is  allocating  $20,910,400  and  352.6  permanent   work-
years for  this  activity,  including $16,380,800  under the  Salaries  and  Expenses
appropriation and S4,529,600 under the Abatement,  Control and Compliance appropria-
tion.
                                  *                            '
      With a 1983  construction  grants appropriation of  $2,430,000,000  EPA expects
to award 771 construction  grants  resulting in 6,446 active  projects at  year's end.
Approximately 1,136 projects are expected to complete construction during  the year.

      Three additional States are  expected to sign initial Section  205(g) delega-
tion management  agreements,  bringing the  total to  49  delegated  States.   Of these
States, 30 are  expected to  have assumed full  responsibility  for  managing  the pro-
gram, an increase  of  nine over  1982. In 1983, States  are expected  to commit 2,078
workyears, or 645 of the total construction grants staffing, the  Corps of  Engineers
175 and EPA the remaining 19%.

     In 1983, EPA  will ensure that  construction  grants funds are  targeted to iden-
tified water quality  and  public  health needs; projects  are  technologically  appro-
priate and within  the financial  capability of the  communities served;  appropriate
Advanced Treatment funding decisions are  made; projects are  expeditlously  completed
and closed out;  grant obligation and outlay projections  are met;  and optimum dele-
gation of  the  program is  achieved.   EPA  will  also  continue to exercise project
management responsibilities in  nondelegated or,  as  appropriate,  in partially de1e~
gated States.

      Construction grants  guidance  will -continue  to be  updated to  reflect  regula-
tory reforms and  legislative  changes.  EPA will  publish  a national  financial  capa-
bility policy and  accompanying  guidance.  This policy will  require  applicants to
demonstrate financial  and management capability to construct, operate, and maintain
proposed treatment works  prior  to  receiving a construction grant and to  implement
user charge  systems mandated  by the 1981  Amendments.   Guidance  will be  issued to
help States  complete  modifications  to -their priority  systems  and lists,  incor-
porating additional  water  quality   criteria. Finally,   EPA  will  allocate   funds
provided 1n  the  Congressional   add-on  to  States  tnds instHutfdns  to support
development of  State  self-sufficiency  and  improved  municipal   treatment  facil-
ities compliance.
                                        WQ-78

-------
      Increased emphasis will  be  placed on documenting  innovative  and  alternative
technologies, disseminating  information  on successful  and unsuccessful  treatment
processes, and delegating review  and  approval  responsibility  for these  projects  to
States.   The Agency will continue to  address  the problems of  small  communities  by
issuing guidance on comparative costs  of alternate treatment works,  and  by continu-
ing work  with  communities  to select  effective,  lower  cost  treatment  processes.

     Based, on the 1981 Admendments, a  revised  secondary  treatment  regulation  will
be issued,  broadening  the   definition  of  eligible  secondary  treatment  processes.
Accompanying technical  information  and  guidance will provide  criteria  for identi-
fying affected  facilities   and  implementing  the  technologies  specified  in the
Amendments.  EPA will  issue Advanced  Treatment  (AT)  Review policy  and  guidance  to
ensure that  funded AT  projects   will   significantly  improve  water quality,  that
reasonable benefits can be demonstrated, and that funding decisions  are  coordinated
with State water quality standards  reviews.   Regions will review 167 AT  projects,
forwarding to Headquarters  those  projects  with  incremental costs over  S3 million.
Staff will" also review Marine Combined  Sewer Overflow  projects to be  funded  with
the $30,000,000 Congress provided in 1983.

      EPA will  eliminate  all  remaining project  completion  and audit  resolution
backlogs.  All project completions  will  be referred to  audit  and all audit  Issues
resolved within six months  of project  and audit completion.

      During 1983,  EPA and  the Corps  of Engineers will   continue  intensive efforts
to ensure  construction integrity;  prevent waste,  fraud, and abuse;  and  respond
effectively to allegations  or evidence  of  problems.  EPA  will  conduct approximately
75 evaluations  of  projects  under construction to minimize construction  and  opera-
tions problems.  Program staff will take  appropriate actions in cooperation  with
the Inspector General in response to problems  of waste,  fraud, and abuse.

      As a  result  of  the   1981  Amendments,  approximately  430 additional  Section
301(h) marine  discharge  waiver  applications  are expected,  including  100 majors,'
with total potential secondary treatments  costs of  $2 billion.  The  final  regula-
tion on the  3.01 (h)  program  will  be issued, clarifying  and simplifying  application
requirements.  Advisory guidance  on monitoring  and  technical  support will  be  pub-
lished along with an overall program monitoring  strategy.

      The Needs  Survey was  accelerated to  meet the  mandated  December 31,  1982
completionHate  andrevised  to  reflect  changes  made  by  the  1981  Amendments.

1983 Explanation of Changes from Budget Estimate

     The net increase +$4,714,800 results from the following actions:

     -Congressional Actions.  (+33,995,700)  The Congressional  add-on to this acti-
vity was composed .0? an  increase of +$350,000 to the Salaries and  .Expenses  appro-
priation for the  advanced  Wastewater Treatment  construction  grants projects and
+$SJ,625,200 to the Abatement,  Control and Compliance appropriation  for .the  waste-
water treatement operator training  programs  focusing on  alleviating noneompliance
problems in Federally funded municipal plants.

     (+$1,020,500)   This increase includes+$1,020,500 of  the $10.5 million Salaries
and Expenses add-on which supports the 480 additional permanent full-time workyears
provided to the Agency.

     -Reprogrammings.  (+$719,100)  This change reflects the  reversal  of the con-
structiongf-ants restructuring which  was  not  approved  by  Congress.    Since the
restructuring was proposed  some  six  months  earlier, reversing the  action revised
the earlier  resource  estimates and resulted  in a net  change of +$356,000  to the
Salaries and Expenses appropriation.
                                        WQ-79

-------
During the  development of  the  operating  plan,  several  reprogrammings  were  made
to this  activity  which are  not reportable under  the  Congressional  reprogramniing
limitations.  These  changes  resulted in  a net increase  of  +$363,100 to the  Sal-
aries and Expenses appropriation.

1982 Accomp 1 •!shments

      Obligations for management of the Construction Grants program in 1982  totaled
$20,044,700 and 422.8  permanent workyears, of which $16,430,400  was for Salaries
and Expenses and $3,614,300 for extramural  activities  under  the Abatement,  Control
and Compliance appropriation.

      EPA awarded 586  construction  grants totaling 51,435,200,000,  resulting  in  a
total of 8,346 active projects at  year end.  Approximately 1,290 projects completed
construction during the year and are operational.

      During 1982, one additional  State accepted initial  Section 205(g)  delegation,
bringing to 46 the  number  of  delegated States and Territories; 21  of these States
assumed full responsibility  for project  management. States  committed 1,901 work-
years to program management  in  1982, which was 59% of  the total  program staffing.
The Corps of Engineers provided 19S and EPA the remaining 22%.

     EPft proposed and  the Congress  enacted major amendments  to the  Clean Water Act
providing for  more   cost-effective,  water-quality   based  targeting  of  funds   for
publicly owned treatment works.  These amendments are described in the Construction
Grants medium.    Implementing  the  1981   Amendments  and  regulatory  reforms,   the
Agency held seminars  on the  effects of  the  changes in the program  and published
guidance consolidating  and  making  discretionary  all  procedural  requirements   for
facilities planning, design, and construction*

      Working with the  Corps  of Engineers, the Agency  Increased  efforts to elimi-
nate backlogs  of projects  awaiting  completion,  audit  resolution,  and closeout.
Consistent with  Congressional  directives, program  staff  resolved  audit   issues
within six months  of audit completion.   The  Corps  of  Engineers  also  assisted EPA
and States in the prevention of waste, fraud,  and abuse through on-site presence at
large facilties,  construction  management evaluations,  and response  to  allegations
or evidence of problems identified to the program.

      The Agency  continued  to  encourage  use  of innovative  and  alternative (I&A)
technologies.   Through  1982, 1900  awards  totaling $189.2  million  have  been  made to
approximately 1,10.0 facilities  for  innovative and  alternative  technology implemen-
tation. In addition, over 15,000 grant awards totaling  over  $7.6  billion have  been
made to small  communities.
                              *

      In 1982,  the  Agency  completed determinations  on  11 pending  Section 301(h)
marine discharge  waiver determinations for major cities.  Of  the original 30 waiver
requests received from major  cities, 6 were  returned  for further action,   16  were
approved, and 8 were denied.  Cost  savings for the 16 approved waivers are estimated
at $820 million.

      EPA Regions referred 15 proposed advanced treatment projects with incremental
costs over $3  million  to  the Administrator  for  review and  approval.  EPA's Head-
quarters review  of  advanced treatment  projects  has resulted  in   savings   of  over
$826 million to  date  in  construction costs  and estimated  yearly  operations  and
maintenance cost savings of over $21 million.        ^
                                       WQ-80

-------
CORPS QF ENGINEERS

1984 Request

     For 1984,  the  Agency  requests  $16,000,000 under  the  Abatement,  Control  and
Compliance appropriation to  support  the  interagency agreement  with  the U.S.  Army
Corps of  Engineers.  This  represents a  decrease  of  $4,187,400 from  1983 due  to
an Increase  in  the  number  of  construction  grants  management activities  to  be
conducted by  the  States  and  an overall  reduction in  the  number  of  active  con-
struction projects.

     This funding level  will  purchase  370 workyears  of effort.  The Corps  will
continue its  traditional  pre-construction  and  construction  management  activi-
ties including  conducting 1,170 biddability  and  constructability  reviews to  de-
termine the  basic  feasibility of  project  proposals  prior to construction  awards,
performing interim inspections  on  1,460 projects, conducting final  inspections  on
approximately 680 projects,  managing 46%  of active  projects under construction,
and maintaining pn-site presence at large,  complex projects.  Additionally, 1t will
continue supporting the  elimination  of  backlogs and preventing  their  reoccurence,
perform an increased number of special State assignments supporting  emerging priori-
ty areas,  and  train  and  advise   State  personnel   on  construction   management.

1983 Program

     EPA is  allocating  520,187,400 in 1983 under  the  Abatement, Control  and  Com-
pliance appropriation.  These  funds  will  purchase  approximately 500  workyears  of
effort.

     The Corps  will  continue to perform biddability and  constructability reviews,
manage 60% of active projects under  construction,  perform  interim  Inspections  on
1,920 projects,  conduct 735  final  inspections, and maintain on-site  presence  at
large complex projects.   Supporting   efforts  to  closeout  completed projects,  the
Corps will handle construction claims,  make  credit determinations and  grant  pay-
ments, and resolve  deflciences with  grantees.   The Corps  1s expected to  perform
special assignments  requested by  States  to  support  closeout  efforts   and  other
priority needs.

1983 Explanation of Changes from Budget  Estimate

     The net increase of +$2,800,000 results from the following  action:

     -Congressional  Action.  (+$2,800,000)   The Congressional  add-on  to this activ-
ity of +$2,800,000 to  the Abatement,  Control  and Compliance  appropriation  was  for
the purchase  of additional  workyears  from  the U.S. Army Corps of Engineers to  sup-
port various  wastewater treatment  facilities  construction management activities.

1982 Accomplishments

     $17,452,500 was  obligated  in 1982  under  the Corps  Interagency  agreement.
These resources purchased  516  workyears  of  support  to EPA  and  States in ensuring
technical and fiscal Integrity of construction projects.

     The Corps performed  1,547  biddability and constructability reviews  to assure
that designs  were  technically  adequate  before  the  construction  contract-  was
awarded, managed  65%  of  active  projects   under  construction,  performed  interim
inspections on  2,440 projects,  and  performed  731  final  inspections.    Continuing
on-site presence also  was  maintained at  all  large, complex  projects  to minimize
                                        WQ-81

-------
potential for waste,  fraud,  and abuse. The  Corps  provided significant  support  to
State and  EPA  efforts  to eliminate  backlogs  by  handling  change  orders,  making
payments, resolving project deficiencies,  and assisting other  needs  of  the  States.

WASTE T REATHENTOPERATIONS AND MAINTENANCE

1984 Program Request

      In 1984, the  Agency requests $1,363,900  and  35.4 permanent workyears  under
the Salaries and  Expenses appropriation.  The  decrease of  .6 permanent  workyears
and $55,700  represents  Headquarters  completion  of  guidance development  efforts
during the year.

      Implementing provisions of the 1981 Amendments,  EPA  will issue early  in 1984
final guidance on  grantee certification  of  plant  performance following  the  first
year of  operation,  including  recommended  corrective actions,  and  continue  assist-
ing States, grantees,  and engineering  firms  to  help ensure that all  new facilities
meet and maintain performance requirements.  Program staff will also coordinate with
Agency compliance  personnel  and  States   to  assist in  the  implementation  of  the
National Municipal Policy for coordinating permitting, enforcement, and construction
grants activities to ensure improved plant performance and compliance.   Staff will
help identify plants with revised treatment requirements and municipalities  requir-
ing additional  or new construction funding to meet  water quality  needs.

1983 Program

      In 1983, the  Agency is  allocating  51,419,600 and  36.0 permanent  workyears
for this activity under the Salaries and Expenses appropriation.

     EPA will begin developing guidance to implement grantee certification require-
ments with  respect  to wastewater  treatment  plant  performance following  the  first
year of operation. The program will  also  assist in the development and implementa-
tion of the Agency's  National  Municipal  Policy to ensure  improved  performance and
compliance by municipal facilities.

1983 Explanation of Changes from Budget Estimate

     The net decrease of -5274,300 results from the following actions:

     -ReprogrammijK)s.  (-$274,300)  This  change reflects  the  reversal   of the con-
struction grants  restructuring which  was  not  approved  by  Congress.    Since  the
restructuring was proposed some  six months  earlier,  reversing the  action  revised
the earlier  resource  estimates and  resulted in a  net  change of  -$292,300  to the
Salaries and Expenses appropriation-

     During the  development   of  the  operating  plan,   several  reprogrammings  were
made to this activity  which  are  not reportable  under the  Congressional  reprogram-
ming limitations.  These  changes  resulted  in  a net  increase of  +$18,000  to the
Salaries and Expenses appropriation.

1982 Accomplishments

      In 1982, the  Agency obligated  31,462,100 and  31.9  permanent workyears,  of
which $1,258,500  was  for  Salaries and Expenses  and  $203,600 was  for Abatement,
Control, and  Compliance. Emphasis  in  1982  was  placed  on   improving  performance
and compliance  of  wastewater treatment  plants built  with   funds  authorized  in
P.L. 92-500. Major  treatment plant  compliance  Increased from 79% at  the  beginn-
ing of  the  year  to  89%  by the  end  of  the third  quarter.  For the  approximately
600 plants  involved,  this represents  a  50% reduction  in  noncompllance. In  addi-
tion, the  annual   survey  of  operations  and  maintenance  required  under  Section
210 of the Clean Water Act was prepared.
                                        WQ-82

-------
NEPA_COMPLIANCE - MUNICIPAL tiASTEWATER TREATMENT FACILITY CONSTRUCTION

1984 Program Request

   The Agency  Is  requesting  no  resources  for  this  program  element  in the  water
medium for 1984. This represents  a  decrease  of  $8,816,800  and 67.0 permanent work-
years from the  1983 levels.   All  resources  and activities  for this  program  are
transferred to the newly created  Interdisciplinary NEPA Compliance program element.

1983 Program

     In 1983, the Agency  is  allocating $8,816,800 and  67.0 permanent  workyears  for
this activity, of which  52,606,200  is for Salaries and  Expenses  and  16,210,600 is
under the Abatement, Control and Compliance appropriation.  Contract resources will
be used to fund preparation of EISs  and related studies.  The Agency expects to ini-
tiate 45 new studies in 1983.

1983 Explanation of Changes from Budget Estimate

     The net increase of +5324,100 results from the following action:

     -Reprogrammi tigs .  (+$324,100)   During  the  development of the  operating plan,
several reprogrammfngs were  made to  this activity which are  not  reportable under
the Congressional  reprogramming   limitations.   These  changes resulted in  a  net
increase of +5324,100 to the Salaries and Expenses appropriation.

1982 :
     In 1982, the  Agency  obligated a total  of 56,368,400 of  which  52,993,900 was
for the Salaries and  Expenses appropriation and $3,374,500  was  for  the Abatement,
Control and  Compliance appropriation.   In  addition to  ongoing  work  in reviewing
environmental information documents, preparing environmental  assessments and issu-
ing findings  of  no significant  impact, the Agency  initiated 49 EISs  and  special
studies and completed three special areawlde studies.
                                       WQ-83

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
tfAT_ER JUAUTY

    ENFORCEMENT
       Water Quality Enforcement..	,..	,	  WQ-85
          Water Quality Enforcement	..	  WQ-86
          Water Quality Enforcement - Legal  & Enforcement Counsel-	  WQ-89
       Water Quality Permit Issuance	,	  WQ-90
                                       WQ-84

-------
                                    WATER  QUALITY

                              Water  Quality Enforcement

                                ACTUAL   BUDGET      CURRENT    ESTIMATE   INCREASE  +
                                 1982   ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983        1983              1984 VS  198.3
                                (DOLLARS IN  THOUSANDS)

PROGRAM
Water Quality
Enforcement
 Salaries & Expenses          516,360.1  513,181.0  $13,267.5   $13,383.8     $116.3
 Abatement Control  4           Sl.005.4     $176.9     5186.9      $203.6      516.7
 Compliance
                       TOTAL  $17,365.5  $13,357.9  513,454.4   513,587.4     $133.0

Water Quality
Enforcement - Legal  &
Enforcement Counsel
 Abatement Control  &             $224.6
 Compliance
                       TOTAL     $224.6

TOTAL:
 Salaries S Expenses          516,360.1  513,181.0  $13,267.5   $13,383.8     $116.3
 Abatement Control  &           $1,230.0     S176.9     $186.9      5203.6      516.7
 Compl iance

Water Quality          TOTAL  $17,590.1  $13,357.9  $13,454.4   513,587.4     $133.0
Enforcement


PERMANENT WORKYEARS
Water Quality                     440.6      326.1      325.6      313.2     -12.4
Enforcement

TOTAL PERMANENT WORKYEARS         440.6      326.1      325.6      313.2     -12.4


TOTAL WORKYEARS
Water Quality                     486.0      365.7      365.2      352.9     -12.3
Enforcement

TOTAL WORKYEARS                   486.0      365.7      365.2      352.9     -12.3
                                       WQ-85

-------
                                    WATER QUALITY


                              Water Quality Enforcement
Budget Request
     The Agency requests a  total  of 513,587,400 and 313.2 permanent workyetrs  for
1984, an increase of $133,000 and a decrease of 12.4 permanent workyears  from  1983.
Included in  the  total  is $13,383,800  for Salaries  and  Expenses and $203,600  for
Abatement, Control and Compliance,  an  increase of $116,300 and of $16,700  respec-
tively.  The program includes both Headquarters and Regional  resources.

P rog ram 0e s c ription

     Water Quality Enforcement —  The  Rational  Pollutant  Discharge  Elimination
System (NPDES}Enforcement  program monitors  compliance,  initiates  administrative
enforcement actions,  and provides  technical   support  for enforcement  litigation
against violators of NPDES permit conditions   The  compliance  status of  permittees
is monitored through on-site inspections and the review of self-monitoring reports.
Administrative or legal  actions  are initiated  in  cases  of significant  noncofflpli-
ance.  This subactivity  covers  compliance monitoring,  compliance  strategy develop-
ment, and administrative enforcement remedies    Legal case development  and referral
of actions to  the  Department of Justice are covered in  the  enforcement  operations
subactivity.

     Major functions of  this program  are  identification  of  noncompliers,  initi-
ation of informal actions to  secure compliance, and negotiation leading  to  admini-
strative enforcement  actions.   Where  informal  negotiations  and  administrative
actions do not achieve compliance,  cases  will  be forwarded to  the Office of  Legal
and Enforcement Counsel  (OLEC)   for action. Technical   support for  such  referrals
is provided as a function of this program.

     In addition  to  the  NPDES  portion of  the  Water Quality  Enforcement program,
administrative and technical support is provided for the  issuance of  administrative
actions against violations  of the  Spill Prevention  Control and Countermeasure Plan
requirements.  Referrals are made to the U.S.  Coast Guard for civil penalty  assess-
ment for  oil  and hazardous  substance  spill  violations  (Section 3ll(b)(6)(A))  in
waters where EPA has jurisdiction,  and inspection  support is  provided  for enforce-
ment against illegal dredge and fill activities (Section 404).

     Watej* jjuality Enforcement - legal and Enforcement_Counse1 —   In  1982  only,
this prograni"element provided contract funds  to support a portion of  the enforce-
ment data system and assist in case development and training.

WATER QUALITY ..ENFORCEMENT

1984 Program Request

     The Agency requests a  total  of 513,587,400 and 313,2 permanent workyears  for
this program, of which $13,383,800 will be for the Salaries and Expenses  appropria-
tion and $203,600 will be  for the Abatement,  Control and Compliance  appropriation.
This is an increase  of $116,300 and $16,700,  respectively.  The  reduction  of 12.4
permanent workyears for  this  activity  from  1983 to 1984 is attributable  to increa-
sed delegation of the program and progress  in  1983  in  raising the  compliance  rates
for industrial and municipal  sources, as well  as  a slight  reduction  in non-NPDES
administrative activities   The  water enforcement program will continue to identify
and respond to  instances of  significant  noncomp-1 lance with  NPDES permit require-
ments and seek  resolution through  negotiations, administrative remedies,  or refer-
rals to the Office of Legal and Enforcement Counsel for further action.
                                         HQ-86

-------
     In 1984 significant progress will be emphasized by the Office  of  Water in  two
key areas:  municipal compliance and compliance by industrial facilities with sec-
ond round permits.

     The NPDE.S program  will  continue to focus  on  improving the rate  of municipal
compliance.   Support  will  be  provided  for  implementing  the  National  Municipal
Policy, which addresses permitting,  compliance  monitoring,  and construction  grant
priorities for promoting  attainment of  statutory  treatment  requirements   by July
1988.  The  Agency will  continue  the  program  for  tracking  compliance  of  major
and minor Publicly Owned Treatment Works (POTWs) funded under the Clean Water Act.

     Where instances  of  noncompliance  occur  in   completed facilities, municipal
operations and maintenance procedures will  be  evaluated  to determine  the cause  of
the violation.   When  inadequate operation  and  maintenance is  determined  to be  a.
causal  factor of  violations,  the Agency  will  review  past  municipal   plant  budget
and operations  records  to  determine if  the problem  is  a  result  of inadequate
funding through the  EPA-approved user charge  system.  Enforcement  remedies will
be applied,  as needed, to resolve problems of continuing  noncompliance.

     In 1984 the  Agency  will  shift resources from compliance sampling inspections
to less resource  intensive nonsampling inspections.  These  activities  will  involve
performance audit and municipal  diagnostic  inspections.    As  a  result, there will
be a decrease of  297  compliance  inspections  from 2,275 to  1,978.  There will  be no
decrease in resources to  support enforcement cases  requiring intensive field  in-
spections.

     EPA will cooperate with the States  to  monitor compliance  of  all  non-municipal
dischargers with the requirements of their NPDES permits.   All major permittees  and
selected minor permittees will  be inspected by EPA  and the  States  to determine com-
pliance, evaluate  operation  and  maintenance procedures,  or audit  the permittee
self-monitoring procedures.   EPA  or the  States will  utilize all available admin-
istrative and judicial  enforcement  mechanisms,  as necessary,  to  resolve  verified
instances of noncompliance.

     EPA will continue  to improve  the  quality of  self-monitoring  data  submitted
by NPDES permittees through the Discharge Monitoring Report Quality  Assurance pro-
gram.  The compliance  inspection program will-be  managed  and  necessary  follow-up
activities initiated.  Regional  operating efficiency in the compliance review area
will be enhanced  through  reform  of requirements   of  discharge monitoring  reports
and improved  compliance inspection  strategies.  Technical  support   for  judicial
actions and  follow-up  programs  will  be  provided,  and a  greater  effort  will   be
focused on improving the  technical  capability of  State programs  in order  for  the
States  to assume more of the  compliance monitoring  activities.

    Headquarters will review and evaluate Regional compliance monitoring programs,
give guidance on  compliance policy  and enforcement  remedies,  and  provide technical
and administrative support as  necessary.   Regional administrative  enforcement  ac-
tivity  will  be monitored to ensure nationally consistent implementation.  The auto-
mated Permit Compliance  System  (PCS)  will   be  strengthened  and  improved  through
data quality assurance  measures, and additional NPDES States  will be encouraged
to use  PCS.   A complete national data base  for  majors will be  maintained  in 1984.

     Hon-NPDES  administrative  enforcement activities will   continue, but  below  the
1983 level,   technical  assistance  and support  will  be provided  to the Office  of
Legal and Enforcement Counsel  in the development  of  civil  and criminal  referrals
to the   Department  of  Justice  and  for   follow-up  and  conclusion  of previously
filed cases.

1983 Program

     The Agency  is allocating a  total of  513,454,400 and 325.6  permanent workyears
to this program,  of which $13,267,500 1s  for Salaries  and  Expenses  and $186,900 is
                                        wq-87

-------
for the Abatement, Control  and  Compliance  appropriation.   During 1983,  the  program
continues to emphasize achieving an improved rate  of municipal  and  industrial  com-
pliance while  working to  promote cooperation  among Headquarters,  Regional,  and
State agencies.

     The compliance program is  encouraging  the  development of  greater  State  tech-
nical expertise and will  encourage States to assume more  of the  compliance monitor-
ing activities.  A revised  strategy for  the  compliance inspection program has  been
developed.  A  neutral  inspection  scheme, to satisfy the  judicial   requirement  for
objective random  selection  of  candidates  for compliance  inspections,  wil]  be
implemented.  An estimated  2,275  compliance  inspections  will  be conducted  by  EPA,
and eight NPDES  compliance monitoring training  and guidance manuals developed  in
1981 will be put into use.   Quality  assurance will become a more  important  part
of the program.

     Approximately 760 administrative  orders and notices of  violations  will  be is-
sued for  violations  of NPDES  requirements.   Non-NPOES administrative  enforcement
activities are  expected  to result  in  approximately  512  actions under the  Spill
Prevention,  Control,  and Countermeasures program,  915 oil  and hazardous  substances
spill referrals to the U.S. Coast Guard,  and 300 dredge  and fill compliance  inspec-
tions.

     Support will be  provided  to help NPDES States  develop  their enforcement manage-
ment systems and maintain their data  systems.   The  Permits  Compliance System (PCS),
used by both States and  Regions,  will  be maintained and  upgraded.   Increased  State
direct use of PCS and link-up  with existing States  systems  with  PCS  will  be  encour-
aged.

1983 Explanation of .Changes from Budget Estimate

     The net increase of +596,500 results from  the  following action:

     -Reprogr amm ings.   (+$96,500)  During  the  development  of  the  operating  plan,
several reprograiiimirigs were made to  this activity  which  are  not reportable  under
the Congressional  reprogramming  limitations.   These changes   resulted  in  a  net
increase of +$86,500 to the Salaries and Expenses  appropriation and a net  increase
of +$10,000 to the Abatement,  Control  and Compliance appropriation.

1982 Accomplishments

     In 1982 the Agency obligated a total of $17,365,500 for this program, including
516,360,100 for  the  Salaries   and Expenses  appropriation   and  $1,005,400  for  the
Abatement, Control and Compliance appropriation.

     Contract resources were used to meet  ADP  information  needs, provide technical
and legal case  support, and  conduct monitoring and inspection training.   During
1982, the activities  supporting  enforcement  actions in emergency situations invol-
ving substantial threats to public health  and  safety received  the  highest  program
priority.

     The national  permit  compliance  rate  for  publically owned  treatment  works
(POTWs) in 1982 was 82% for major dischargers.   Of 2,385 facilities,  only 438  were
not meeting final  effluent  limits  for  secondary treatment or better.   In 1983 EPA
expects the POTW compliance rate for  plants built with  Federal  funds under  P.L.-92-
500 will be 855.

     The national permit compliance rate for industrial  and other nonmunicipal  dis-
chargers in 1982 was  88% for major permits.   Of 3,106 facilities, only 359  were not
meeting final  effluent limits.   In 1983  EPA expects the compliance rate for these
dischargers  will be 89%.
                                        WQ-88

-------
     Enforcement against municipal  facilities that missed the  secondary  treatment
deadline of July  1, 1977,  was  also a  priority.   Approximately 82  Administrative
Orders under Section  301(A)(5)(a)  were  issued  in 1982.  Permit,  enforcement,  and
construction grant activities were  coordinated to expedite municipal  construction
and increase municipal compliance.

     Regional offices  conducted approximately  1,763  compliance   inspections,  and
issued 72 Notices of  Violations  and 317 Administrative Orders.  In  States  without
approved NPDES programs, EPA  reviewed major dischargers' self-monitoring  reports.
Technical support was  provided  for  the  development  of 47 civil  cases which  were
referred to Headquarters for review.

     Enforcement of  Section 311  oil  and  hazardous  substance spill  requirements
consisted of 523 referrals to the U.S Coast Guard for assessment of civil  penalties
and 187  administrative actions  for violations  of  Spill Prevention  Control  and
Counter measure plan requirements.

     Enforcement of  Section 404  provisions  focused on  identifying  illegal  dis-
chargers of  dredge  and fill  material.  Three  administrative  actions  were  taken.

WATER QUALITY ENFORCEMENT  - Legal and jEnforcement Counsel

1984 Program Request

     The Agency requests no funds for this activity in 1984.

1983 Accompli:shments

     The Agency is allocating no funds for this activity in  1983.

1982 Accomplishments

     The Agency obligated  $224,600  in Abatement,  Control and Compliance  funds to
provide support for the enforcement docket system,  case  development,  and  training
efforts.  This work was completed in 1982.
                                       WQ-89

-------
                                    WATER QUALITY

                            Water Quality Permit Issuance

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Permit Issuance
 Salaries & Expenses           $6,770.5   56,986.6   $7,932.3   $8,659.1    S726.8
 Abatement Control  &           $4,207.2   S3,209.9   $3,205.6   $4,741.1  $1,535.5
 Compliance
 Operations, Research &          $700.0
 Facilities
                       TOTAL  $11,677.7  510,196.5  $11,137.9  $13,400.2  $2,262.3

TOTAL:
 Salaries & Expenses           $6,770.5   $6,986.6   $7,932.3   $8,659.1    $726.8
 Abatement Control  «           $4,207.2   $3,209.9   $3,205.6   $4,741.1  $1,535.5
 Compliance
 Operations, Research &          $700.0
 Facilities

Water Quality Permit   TOTAL  $11,677.7  $10,196.5  $11,137.9  $13,400.2  $2,262.3
Issuance


PERMANENT WORKYEARS
Permit Issuance                   177.1      163.9      201.5      187,5     -14.0

TOTAL PERMANENT WORKYEARS         177.1      163.9      201.5      187.5     -14.0


TOTAL WORKYEARS
Permit Issuance
TOTAL WORKYEARS
202.0
202.0
206.3
206.3
242.6
242.6
233,1
233.1
-9.5
-9.5
                                      WQ-90

-------
                                   WATER QUALITY


                                  Permit Issuance
Budget Request
     The Agency requests a  total  of $13,400,200 and 187.5 permanent workyears  for
1984.  This represents an increase  of $2,262,300 and a decrease  of 14.0 permanent
workyears from 1983.  Included in the request is $8,659,100 for Salaries  and Expen-
ses and 54,741,100 for Abatement,  Control  and Compliance,  representing  increases  of
$726,800 and  $1,535,500,  respectively.   This  program  includes  both  Headquarters
and Regional resources.

.Program Description

     The National  Pollutant Discharge  Elimination  System  (NPOES)  permit  program  is
a result of  a  comprehensive legislative mandate in  the  Clean Water Act  to  reduce
or eliminate point  source  pollution  from  industrial, municipal, commercial,  and
agricultural discharges.   The  Act prohibits  the discharge  of pollutants into  all
waters of the United  States unless  a permit is issued  by EPA or an  EPA-approved
State program.   A primary  function of  the  permit  program is the encouragement  of
State assumption of  responsibility for the  NPDES  program.   At present,   34  States
and one territory  have approved NPDES programs.

     The permit is  a  mechanism for imposing  discharge limitations on  point source
dischargers based on  national  effluent limitation  guidelines,  national performance
standards for new  source facilities,  or  water  quality standards.  Where national
effluent limitation guidelines  have  not been promulgated  for a  particular  indus-
trial discharger,  the effluent limits  are  set by  the permitting authority  using
best professional  judgment based on available and economically feasible technology.
Those permits are  issued  case  by  case.   Additionally,   if established  national
effluent limits will not reduce pollutants enough to meet  the ambient water quality
standards set by the  State or EPA,  the permit imposes more  stringent limitations
on a  facility  to  meet  the  water quality  standards.   Permits  also   include  time
schedules and deadlines for pollutant reduction.

     Controlling discharges  of  priority pollutants  including  toxics  is   the  major
emphasis of the NPDES permit  program.  Direct  discharges  of  these pollutants  into
navigable waters are controlled by the inclusion of Best Available Technology (BAT)
limitations into industrial  permits.   Indirect discharges of  priority pollutants,
i.e, industrial  discharges to publicly owned treatment works, are controlled though
the pretreatment program.   This program gives  municipalities  and States  the  pri-
mary responsibility for enforcing national  pretreatment standards.

     Another important function of  the NPDES program is  to  provide technical  sup-
port for evidentiary  hearings  held on the terms, conditions,  and effluent  limita-
tions in permits and  requests  for variances from permit  effluent limitations.   EPA
also conducts nonadversarlal panel hearings for municipalities which have requested
marine discharge modifications  under  Section 301(h)  of the Clean Water  Act.   Mon-
adversarial panel  hearings  are  used  to issue an NPDES permit  to  a  discharger that
has not  previously  held  an  NPDES permit,  as  well  as in  decisions  on   variances
requested by direct dischargers.

PERMIT ISSUANCE

1984 Program Request

     The Agency requests a  total  of $13,400,200 -and 187.5 permanent workyears  for
the NPDES Permits Issuance  program,  of which $8,659,100  will  be for  the Salaries
and Expenses appropriation  and $4,741,100  will  be for the Abatement,  Control,  and
                                       WQ-91

-------
Compliance appropriation.   This reflects an  increase  of 52,262,300 and  a  decrease
of 14.0 permanent workyears.  The increa.se of 51,535,500 in Abatement, Control  and
Compliance will be for technical  support to review marine  discharge  waiver  requests
under Section 301 (h) of the Act-  The decrease  in  permanent wortyears  is attribut-
able to increased use of  general  permits,  delegation  of the program to the  States,
and more efficient  Agency procedures.   The  increase  of $726,800  in  Salaries  and
Expenses represents increased workyear  costs.

     These resources will  be used primarily  for major permit  issuance  (EPA  classi-
fies discharges  as  "major"  or "minor"  depending  on effluent  volume,  strength,
toxics, and  environmental   consequences)  as well  as related  activities, including
resolution of  evidentiary hearings   and determinations  on variance  requests  for
municipalities and industries.

     Priority industrial   permit  lists  developed  in accordance  with  the  national
second round  permit policy  will  be the   basis  for  issuing  permits  during  1984.
Approximately 300 major industrial  permits will  be issued by EPA in  nondelegated
States.                                                    ._

     Increased emphasis will be  given  to issuing  general   permits,  including  Outer
Continental Shelf general   permits.   Wherever possible, consistent  with legal  and
environmental considerations,  general  permits  will  be  issued  to  categories  of
facilities in order to reduce the  backlog of  expired permits as quickly as  possible
and to ensure  control  of  pollutants from  facilities  which might otherwise  remain
unperaitted.  Approximately 60 general  permits,  including  10  DCS general  permits,
will be issued by EPA during 1984.

     During 1984, added emphasis  will  be  given to reissuing municipal  permits  to
reflect Section 301(h) waivers and  revisions to secondary  treatment standards,  and
to reduce  the  backlog of expired municipal  permits.   The Agency  will  issue  181
major municipal permits.

     As effluent guidelines  are  promulgated,  the  number of variance requests  from
industries will  increase  and  could  be  significant in 1984.   Approximately 600  to
850 requests each are  expected for  Sections  301(c) and 301(g) variances.  Only  the
highest priority variance  requests  will  be evaluated  during  1984.  Evaluation  and
review of these variances  will  continue into  1985  and  beyond.

     During 1984, requests for appeals  will  be granted on about 50% of the  major
industrial permits  issued.   These  granted requests  will  be  in addition  to  the
requests that will  carry  over  from  1983.   An estimated  76  granted  requests  will  be
resolved in  1984;  ^73 will  be  resolved through  negotiation and  3  will   require
formal hearings.  These numbers  are based on the  assumptions that more than  95»
of the appeals  of  permits  limitations  that  are  granted  can be resolved  through
negotiation.

     Emphasis will  be given to assisting in development  of new State NPOES  programs
and achieving  necessary   program  modifications   by  States  already  having  NPDES
authority.  Such program modifications include  NPDES  State assumption  of pretreat-
ment, Federal facilities,  and  general permit program  authorities.   It  is estimated
that during 1984 two States  will  receive4 full  NPDES authority and 18  NPOES  States
will receive program modification  approval.  EPA will  be working with  NPDES  States
which request  EPA  Regional  assistance  in  developing  permits,   especially  where
guidelines are not available.  Such  requests  are expected  to increase as  the States
focus on more difficult high priority second round permits.

     In 1981 and 1982, permits  issued  to most POTHs  required  to  develop pretreat-
ment programs included schedules  for submitting  such  programs for  approval  by July
1983.  A small  number  of  programs have  been  submitted,  but a  significant  increase
in submittals should occur  in  late  1983 and in 1984.   During 1983  and 1984,  these
POTW programs will  be  reviewed and  permits will  be reissued to require implementa-
                                       WQ-92

-------
tion of  approved  pretreatment  programs.   Fundamentally  Different  Factors  (FDF)
requests and  categorical  standards  determinations  will  continue  as  pretreatroent
categorical standards are promulgated.

     During 1984, emphasis will  be given to approval  or  denial  of Section  301(h)
marine discharge waivers  consistent  with the large  increase  in applications  fol-
lowing the December  1981  CWA  amendments.   These waivers  are technically  complex
and require contractor support to  assist  in  evaluating  the adequacy of application
Information necessary  for making  initial  determinations  on   the  301 (h)  request.
EPA will evaluate 80 applications for marine discharge  waivers.

     A major  initative will  continue  in  1984 to review and revise the  NPOES poli-
cies and regulations to reduce paperwork, improve application  forms,  and eliminate
unnecessary or  overly  burdensome  requirements.   Regulations  reflecting litigation
settlement and Paperwork  Reduction Act reforms will  be  proposed  in 1983 and  should
be promulgated in late 1983 or early 1984.  Much of this activity will  result from
anticipated litigation on the revisions to the NPDES and  pretreatment  regulations.
In addition, work  groups  will  be formed to  re-evaluate all reporting  requirements
to assess appropriateness, adequacy, and use of information required of States and
the regulated public.

1983Program

     In 1983, the Agency  is  allocating  a total  of  311,137,900 to the  Permits Issu-
ance program, of  which $7,932,300 is  for the Salaries and Expenses  appropriation
and $3,205,600  is  for the Abatement,  Control  and  Compliance  appropriation.   Con-
tracts provide  support for  technical  assistance for  permit  writers,  evidentiary
hearing support, pretreatment program  assistance,  and   general program  operations.

     In 1983, the  program  will  continue to  issue  second  round  permits  consistent
with the permit  strategy  issued in 1982,  The  strategy requires establishment  of
priorities for industrial permits  based  on   known or  suspected  impairment  of uses
attributable to water  pollution and on industrial categories  where effluent guide-
lines have been established or where such guidelines are not scheduled  to be estab-
lished.  The Agency  estimates  that 274 priority industrial  permits will  be issued
in 1983.

     Most municipal permits must be  reissued during 1983 and  beyond based on revi-
sions to  secondary  treatment  standards, Section  301{h)  waivers,  Section  301(i)
extensions, pretreatment program requirements, and  expiration  of existing permits.
In order to  avoid doubling  permit issuance workload,  permits  will  be  issued  in
1983 only to municipalities where  subsequent revisions  will  not be necessary.  The
Agency estimates that  approximately 100  municipal  permits will  be issued in 1983.

     During 1983, priority again will  be given  to  the  development and  issuance of
general permits to the Outer Continental  Shelf  activities and new general  permit-
ting categories.   An additional 26  general permits  will be issued  during 1983.

     Municipal permits  issued  to   most  POTWs   required  to  develop   pretreatment
programs included  schedules  for  submitting such  programs  for  approval  by  July,
1983.  The Agency  will  focus on reviewing  these POTW  program submittals in 1983.

     Major emphasis  will  continue  on revising permitting and  pertreatment regula-
tions.  Revisions  to  the  NPDES portion  of the  Consolidated Permit  regulations,
based on the  litigation  settlement,  were proposed  in  1982.    Additional  revisions
reflecting Paperwork  Reduction  Act  reforms  should  be  completed  by  late 1983  or
early 1984.  The Consolidated  Permit  regulations will   also be  revamped to provide
separate, easier to understand,  regulations  for  each permitting  program and should
be completed  during  1983.   In  1983 proposed revisions  to  pretreatmen.t regulations
will be promulgated, reflecting changes in the removal  credits formula.
                                        WQ-93

-------
1983 Explanati on of Changes from Budget Estimate

     The net increase of +$941,400 results  from the  following  actions:

     -Congressional Action.  (+S738.900)   This  increase includes +738,900  of  the
$10.5 million Salaries and  Expenses  add-on  which  supports  the 480 additional per-
manent full-time workyears provided to the  Agency.

     -Reprogrammings.  (+3202,500)   During the  development  of the operating plan,
several reprogrammings were  wade to this activity  which are  not reportable under
the Congressional  reprogramroing limitations.   These  changes  resulted  in   a   net
increase of +5206,800 to the Salaries and Expenses  appropriation  and  a  net decrease
of -$4,300 to the Abatement, Control  and Compliance  appropriation.

1982 Accomplishments

     In 1982, the Agency obligated a total  of S11,677,7QO for  this program,  includ-
ing $6,770,500  for the  Salaries and  Expenses appropriation, $4,207,200  for  the
Abatement, Control, and Compliance appropriation, and 5700,000 for the Operations,
Research, and Facilities appropriation.

     In 1982, EPA  Issued  a  total  of  165 major and 914  minor  permits.  Of the 1079
permits, 760  were  industrial  (81  majors),  and 319  were  municipal  (84 majors).
Other activities  included  assistance  to the  pretreatment program  and technical
guidance on  second  round permit issuance with emphasis on control  of toxics  and
on water quality impaired areas.

     In 1982, a  second  round  permit strategy  was  issued which  gave  priority  to
issuing permits   in  water use  impaired  areas  and  where BAT  guidelines  have been
promulgated.  Permit priority lists were developed based on this  strategy.   Indus-
trial  teams, composed of  EPA and State personnel, developed permits  for  facilities
ranked high on these priority lists.  These Industry team permits were used  by  EPA
and State permit writers  as models to  assist  in translating guidelines into  permit
conditions and to assist in developing permit conditions for industrial subcategor-
ies where guidelines are not scheduled.

     Currently,  35  States and  Territories  have approved  NPDES  programs  and  are
Issuing permits.  Two States were  approved  during  1982.  In addition,  four  previ-
ously approved  NPDES  States  received  pretreatment  authority,  and one received
Federal facility authorization.  This brings the total to 14  States  with pretreat-
ment authority and 22 States with Federal facility  permitting  authority.

     EPA continued to develop  and  issue resource-saving general  permits for off-
shore oi'l  and  gas  facilities.  The program  developed new  categories  of point
sources which can  be included in general permits.  The  process for reviewing draft
and final general permits was streamlined.

     The Agency   continued  its  review of all permitting policies and procedures  to
streamline the permitting process  by reducing paperwork and  reporting burdens  on
permittees and to  encourage State  program  approvals.   As  a result of this  review,
the NPDES regulations and the NPDES permit  application forms were revised.   Reforms
based on litigation  issues  were proposed In 1982 and  will  be promulgated  in 1983
or early 1984.   Additional  reforms  covering regulations and  administrative  proce-
dures have been  developed and will  be proposed in  early  1983.

     In 1982, Phase  I  of the  Regulatory  Impact Analysis  for EPA's  pretreatment
program was  completed.   The review  led  to suggested Clean  Mater Act amendments.
Revisions to  the  removal  credit  formula in the  General  Pretreatment regulations'
were proposed in  1982.   The  Agency  began to  review POTW  pretreatment  program
submittals in 1982.
                                       WQ-94

-------
Page Intentionally Blank

-------
Drinking Water
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
DRINKING MATER                                                              DW-1

    RESEARCH 4 DEVELOPMENT
       Dri nk1 ng Water Research	"...  DW-8
    ABATEMENT 4 CONTROL
       Drinking Water Criteria, Standards 4 Guidelines	...	  OW-22
       Drinking Water State Program Resource Assistance..........	  DW-27
          Public Water Systems Supervision Program Grants...,....".........  DW-28
          Underground Injection Control Program Grants	  DW-30
          Special Studies 4 Demonstrations	  DW-31
          Tral n1 ng	,	  DW-32
       Drinking Water Management	  OW-33
          Public Water Systems Supervision Program Assistance	  DW-34
          Underground injection Control Program.	  OW-37
    ENFORCEMENT
          Drinking Water Enforcement...	  OW-41
                                        DW-1

-------
                                    DRINKING WATER

                                ACTUAL    BUDGET
                                 1982    ESTIMATE
                                           1983
                      CURRENT   ESTIMATE   INCREASE  +•
                      ESTIMATE     1984    DECREASE  -
                        1983              1984  V5  1983
APPROPRIATION
 Salaries & Expenses

 Abatement Control S
 Compliance
 Research & Development

TOTAL, Drinking Water
PERMANENT WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
  {DOLLARS IN THOUSANDS)




$22,224.7  $24,515.9  $24,796.7  $24,554.5     -$242.2

$40,944.5  $31,775.9  $39,303.5  $29,893.4   -$9,410.1

$22,729.5  513,458.3  $13,858.3  $11,908.0   -$1,950.3

$85,898.7  $69,750.1  $77,958.5  $66,355.9  -$11,602.6
    474.3     . 455.5      471.2      465.1        -6.1
    566.4      550.8      562.4      560.8        -1.6
$80,715.0  $83,882.7  $76,760.0  $73,568.0   -$3,192.0
$90,000.0
                                      DW-2

-------
                                   DRINKING WATER


OVERVIEW AND STRATEGY

     The Safe Drinking Water Act of 1974 charged EPA with the responsibility of en-
suring that the Nation's water  supplies are free,from  contamination  which  may  pose
a risk to the health of persons-   In  carrying  out  this mandate, EPA  is  required to
set standards  for  these  contaminants and  to assure compliance among public water
systems.  The  Agency Is  also  required  to protect underground water  sources  of
drinking water from contamination due to underground injection practices.   Although
EPA is required to  establish  minimum  national  requirements  for these programs, the
Act clearly intended that the States would assume primary enforcement responsibility
(primacy) for  implementing these  programs.  (The term  "States"  collectively  refers
to the 57 States and Territories as .defined in  the Act.)   To provide  incentive to
the States  in  their efforts  to assume primacy, the Act provides  that EPA offer
technical and financial  assistance.

     To be  granted program delegations  for the Public Water Systems  Supervision
(PWS) or Underground Injection  Control  (UIC) programs,  the  States must  first adopt
regulatory requirements  at  least  as  stringent  as the  Federal  requirements.    In
the event a State  does not  choose to  accept primacy and on  Indian Lands,  EPA  must
implement and enforce the regulatory requirements directly.

     Over the past years, the Agency has worked  closely with the  States in promot-
ing primary  enforcement  responsibility  for the  PWS  program.  This major  effort
proved to be  a worthwhile investment in that  51  States and Territories  now  have
assumed this responsibility.  In the early stages of the program,  the States placed
major emphasis on achieving compliance among the systems serving the  largest popula-
tions.  However, as monitoring data  became  available, it was determined  that the
vast majority  of  violations  were in  small  systems  serving populations of under
3,300 consumers.   Because  of financial constraints,  these  small  systems  have had
difficulty achieving and  maintaining  compliance.   With this  in  nrind,  the  Agency
developed a strategy  which  provides these  systems  with alternative approaches  by
which to pursue full  compliance.  The  strategy  focuses on  monitoring  to  identify
problems and their  magnitude, assessing alternative means of obtaining  compliance,
and following up to require compliance whenever it  is feasible to  do so.

     The priority   given  to  small  systems  is largely responsible for  the  dramatic
improvement in the compliance rates with microbiological standards among persistent
violators-  These   violations  decreased  from 3%  in 1980 to  less  than  1%  in 1981.
Persistent monitoring and  reporting violations decreased by 50%  from  17%  in  1980
to 8.6%  in  1981.    Efforts  to Improve  the  rate of  compliance remain  the  primary
focus of the PWS program  in  order to  further  ensure the Nation  of the safety  of
its drinking water.

     Because of the high  rate  of  delegations  achieved in the PWS  program  and the
State/EPA partnerships which were established and have been  maintained,  EPA expects
to have the same  success  in delegating the Underground Injection Control  program.
By the end  of  1982, four States  had  received  primary  enforcement  responsibility.
It is  anticipated  that  an additional  23  States will  be delegated  the program, in
1983.  Twelve  additional  State  programs  are  expected during  1984,  bringing the
number of  fully delegated  States  to  39  by  the  end of  the 1984  fiscal year.

     Current priorities for the drinking water  program are as follows:        ,  •

     1,  Revise current health  protection  standards  by streamlining the regulatory
         requirements,  presenting  a more  flexible  approach,  and extending protec-
         tion against currently unregulated contaminants (where needed).

     2.  Improve compliance with applicable drinking water standards.

     3.  Delegate  the  Underground Injection  Control  Program and  begin  Federal
         implementation where necessary.

     4.  Address ground water problems.
                                         DW-3

-------
Revise Current Health Protection Standards

      Currently, the  drinking  water  program  operates  under the  National  Interim
Primary Drinking  Water  Regulations (NIPDHR)  In  effect since  1977.   These  regula-
tions require that delivered drinking water be  routinely  monitored and satisfy the
standards for bacterial,  Inorganic,  organic  (for certain  pesticides), and radionu-
clide contaminants as well  as  for  turbidity.  A  standard  for the control  of trlha-
lomethanes was promulgated  1n  1979.   The  Act  mandates that the Interim Regulations
will be  supplanted by  Revised NPDWRs  which  are  to provide  comprehensive  health
protection based  on  additional data.   In  developing these revised  standards,  EPA
seeks to establish a firm scientific basis for each contaminant currently regulated
as well  as  to develop  standards,  where needed,  for  contaminants not  included  1n
the  Interim  Regulations.  This requirement also provides  an opportunity to  relieve
regulatory burden through rev-few of current requirements,  to weed out unnecessarily
cumbersome provisions,  and  to  minimize  the need for variances and exemptions.  The
requirement to review allows EPA to  consider  innovations,  such as more flexibility
in monitoring and  reporting procedures, based on the  continuing  experience  of the
State program and the systems.  In making  revisions to the national  standards, the
Aoency 1s required  to make  two determinations.   First, EPA 1s required to  set the
level of  contamination  which  precludes any  adverse  human health  effects,  called
the  Recommended  Maximum  Contaminant  Level  (RMCL).   Upon  establishing  the  RMCL,
EPA  then determines enforceable standards,  called Maximum Contaminant Levels  (MCLs),
for  the contaminants which  can be achieved utilizing generally available technology
(takinn cost Into consideration).

     The complete  revision  of the national  standards  will progress  in  stages,  by
groups of  contaminants.  The  first  group  to be  addressed will  be  the  Volatile
Organic Contaminants  (VOCs).   Presently,  this   group  is  unregulated, but  recent
surveys of  systems  with  ground  water supplies  have shown  that these contaminants
occur in drinking  water  suoplies nationwide.   Moreover,  a growing number  of con-
tamination incidents Involving these compounds  are being  discovered.  The  Agency
1s considering  the need  for  establishing regulations  for  VOCs.   Should  1t  be
determined that  they  pose  a public  health threat,  we  will propose RMCLs  in  mid-
1983, with  proposal  of MCLs  in  early  1984  and  promulgation  to  follow  in late
1984.  Concurrently, efforts will be  made  to complete the  development of the revised
regulations for  existing  standards  by proposing  RMCLs  1n early  1984,  following
with proposal of  MCLs   in late 1984.   The Agency  will also Initiate  revisions  to
the  Interim Regulations for Trlhalomethanes.

     A major  initiative proposed  for 1984 1s to review  scientific  data  to  deter-
mine the threat  to  public health posed by newly Identified and  characterized or-
ganic contaminants based  on scientific data  showing possible  public  health  risks.
Althouah the  Agency  has  already expended  considerable effort  Into  the regulation
of organic contaminants, 1t 1s evident that the  larger portion of the total  organic
content of  drinking water  has  not  been  characterized.  This  contamination  is
composed of non-volatile,  higher molecular weight constituents which resist  identi-
fication and  measurement  by any but the'most  sophisticated  instruments.   Because
of the public concern regarding the  possible  health risks caused by these contami-
nants, the  Agency  feels  that the drinking  water program  should  establish  the
degree of hazard to public health by  Identifying  and characterizing these contami-
nants, their health risks,  and their  exposure levels.   This will provide  the basis
for  possible regulatory action by the Agency.

     The Office  of Research  and  Development (ORD)  program provides  direct Input
Into the regulatory development  process by providing  current  data  on  the toxic.ity
of the chemicals  of concern*   The program also  pursues   the  longer  term research
needs to provide a more accurate basis  for future decision-making.  A major effort
is being initiated to develop  and apply methods, through observation or experience,
which will  establish  specifically  the  toxicologlcal  potential  of  contaminants  at
low dosages  and  in  combination,  without  resorting  to large  animal  populations.
ORD will  support  the  regulatory program  by  assisting  1n developing  estimates  of
health risks  and  participating In review  and Interpretation  of  assessments.   ORD
also is  developing a methodology to  address health  risks  associated  with multiple
compound exposure in drinking  water.   ORD will  also provide data on the treatment
technology,  performance, and cost of  removing  organic contaminants and will maintain
the program to assure the accuracy  of water Quality measurements. -
                                       DW-4

-------
 Improve Compliance with Applicable Standards

      Mow that the Institutional framework  for  the public  water  systems  supervision
 programs is  in place and compliance is the rule rather than the exception, emphasis
 will  be  directed toward  achieving  a greater degree  of  compliance  among  small
 systems.  The Agency  has  developed a strategy which  provides a suggested approach
 to achieving  compliance through  technical  assistance  and enforcement,  Including
 providing Information  on treatment  methods  and  institutional  arrangements  which
 can reduce the cost of compliance.

      The Research and Development program contributes towards this effort by study-
 ing and  providing  data on  cost-effective treatment  technology for small  systems
 and by further expanding the Quality  assurance  program for laboratory certification.

      EPA enforces Primary Drinking  Water Regulations  1n States that have not been
 delegated primary enforcement responsibility.  This is done by investigating viola-
 tions, issuing variances and  exemptions  to systems,  and  taking enforcement action
 against recalcitrant  systems  that  refuse  to  comply  with  regulatory  requirements.

 Maximize UIC Delegations and Implement Federal  Programs

      The Underground Injection Control {UIC) program is designed to prevent the con-
 tamination of  underground  sources   of   drinking  water  caused  by  poor  injection
 practices.  Development  of  UIC  programs  in  both  primacy  and  non-primacy  States
 will  continue during  1983.   Our strategy  for  implementation 1n non-primacy States
 is to establish  programs in 1983 in  those  18 States which have  officially notified
 us of their  Intent  not to assume primacy.  To maximize  the number  of delegations,
 we will  continue to work with  those States  that have not  applied  for  program re-
 sponsibility but  are  working  toward it.   Major objectives  in implementing  both
 State anrt  Federal  programs  Include  the phase-out  of  all  Class  IV  wells,  which
 inject hazardous  waste  directly  Into  underground  sources  of   drinking  water;
 mechanical integrity  testing  of the  existing  Class  I-III  wells  {waste  injection,
 oil and gas, and mining! as stipulated 1n the five year schedule in the  regulations
 to assure that no  contamination takes place due  to faulty construction; and tech-
 nical evaluations of  permit applications for  nsw Class  I, II,  and III  wells,  in-
 cluding the full  Implementation of the area of review requirements.

      The drinking water enforcement program will  concentrate on  implementing a per-
 mitting and  enforcement program for  Underground  Injection Control regulations  in
 States that have not assumed program delegation.   EPA will also  help States develop
 compliance monitoring  and  permitting aspects  of their  programs  as well  as  issue
 permits, initiate investigations, and take enforcement actions.

 Address Ground Water Problems

      The Agency  is  seeking  to  coordinate all  existing authorities and  resources as
 they  relate  to  ground  water,   assess the extent  of ground water contamination,
 assist the States in developing their own ground water strategies,  develop a revised
 ground water monitoring strategy and a cross cutting guidance, and, where necessary,
 make  regulatory modifications  to  achieve greater consistency in  program decision-
 making.

      The Agency  also plans to establish'?  coordinated ground water  research effort
 by expanding basic  knowledge about  ground  water protection.  The objective of  the
 program 1s to understand  the  transport and fate of contaminants  1n the subsurface
environment, to predict and estimate  the movement,  persistence, and/or  transforma-
 tion  of  plumes  of  contaminants in  the subsurface  environment,   and  to  Increase
 development of new technologies for  use  in detection, prevention, and remediation.
 Being able to anticipate the potential for harm win make strategies for preventing
them  much more efficient.   Work is also underway on  improving the  means  to investi-
gate  and monitor contamination.   In addition,  the  health  research  program  will
continue to provide  information on  the  health  effects  of  contaminants found  1n
 ground water  for Agency  and  State  use  in   addressing  ground  water  pollution.
                                       DW-5

-------
                                   DRINKING  WATER
Program Activities

Number of States with
 primacy enforcement
 responsibili ty
    Public Water Systems
     Supervision
    Underground Injection
     Control

Laboratories certified  in
 PWS non-prinacy States

Sole source aouifer
 designation

Underground Infection
 Control permits issued by
 EPA in non-orimacy
 States
          Budget     Current              Increase +
Actual    Estimate   Estimate   Estimate    Decrease -
 1982      1983       1983       1984     1984  vs  1983
50
4
125
2
50
40
125
4
51
27
125
7
51
39
125
5
0
+12
0
-2
           215
215
295
+80
                                      DW-6

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
PRINKING WATER

    RESEARCH .* DEVELOPMENT
       Ori nk1 ng Water Research	  DW-8
                                      DW-7

-------
     DRINKING WATER
Drinking Water Research
ACTUAL
1982
PROGRAM
Scientific Assessment
Salaries & Expenses
Research & Development
TOTAL
Technical Information &
Liaison
Salaries & Expenses
Research & Development
TOTAL
Monitoring Systems &
Quality Assurance
Salaries & Expenses
Research & Development
TOTAL
Health Effects
Salaries & Expenses
Research & Development
TOTAL
Environmental
Engineering &
Technology
Salaries 4 Expenses
Research & Development
TOTAL
Environmental Processes
& Effects
Salaries & Expenses
Research & Development
TOTAL
TOTAL:
Salaries S Expenses
Research & Development
Drinking Water TOTAL
Research
(DOLLARS
$10.7
$10.7
$186.6
$11.0
$197. 6
$910.4
BUDGET
ESTIMATE
1983
CURRENT ESTIMATE
ESTIMATE 1984
1983
INCREASE +
DECREASE -
1984 VS 1983
IN THOUSANDS)
$1
$482.5
$1,

$2,
$9,
512,



S2,
$8,
$11,


$1,
$3,
$4,

$8,
$22,
$30,

392.9

970.2
648.2
618.4



938.2
388.2
826.4


167.0
699.6
866.6

.183.1
729.5
912.6

$1

$3
$5
$9



$3
$3
S6


$1
$3
54

$9
$13
;$22

S84.
$30.
$114.
$181.
$100.
$281.
,020.
$723.
,744.

,-928.
,198.
,126.



,153.
,726.
,879.


,078.
,679.
,758.

,447.
,458.
,905.

4
5
9-
6
0
6
5
7
2

7
1
8



3
4
7


7
6
3

2
3
5

$84.4
$30.5
SI 14. 9
$1,219.8
$723.7
$1,

$3,
$5,
$9,



$3,
$4,
$7,


$1,
$3,
$4,

$9,
$13,
$23,

943.5

928.7
198.1
126.8



153.3
226.4
379.7


078.7
679.6
758.3

464.9
858.3
323.2

$193.
$30.
$224.
$1,437.
$703.
$2,

$3,
55,
$8,



52,
$2,
$5,


$1,
$3,
54,

$8,
$11,
$20,

140.

530.
219.
749.



722.
827.
550.


107.
127.
234.

991.
908.
899.

6
5
1
5
3
8

7
1
8



8
4
2


2
7
9

8
0
8

$109.2
$109.2
$217.7
-$20.4
$197.3

-$.398.0
$21.0
-$377.0



-$430.5
-$1,399.0
-$1,829.5


$28.5
-$551.9
-$523.4

-$473.1
-$1,950.3
-$2,423.4

         DW-8

-------
                                    DRINKING WATER
                               Drinking  Water Research
                                ACTUAL    BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982     ESTIMATE   ESTIMATE     1984    DECREASE -
                                           1983       1983             1984 VS 1983

PERMANENT WORK YEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems 4
Quality Assurance
Health Effects
Environmental Engineering
(DOLLARS IN THOUSANDS]

1.0
2.6 2.2
15.8 16.1
44.7 43.6
56.3 47.1
1

1.0 3.0 2.0

22.1 22.1
43.6 49.6 6.0
47.1 45.1 -2.0
4 Technology
Environmental  Processes            23.1        22.3       22.3       22.3
4 Effects
TOTAL PERMANENT WORKYEARS         142.5       132.3       136.1      142.1
                                            6.0
TOTAL WORKYEARS
Scientific Assessment
Technical Information 4
Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental  Engineering
& Technology
Environmental  Processes
& Effects
TOTAL WORKYEARS
   .1
  3.0
 18.0

 63.7
 73.0

 25.2
 2.0
 4.2

19.1

60.5
59.3
 2.0

24.8

60.5
58.3
24.5     "  24.5
 4.0

25.1

66.5
57.3

24.5
183.0:      169.6
          170.1      177.4
 2.0

  .3
 6.0
-1.0


 7.3
                                      DW-9

-------
                                   DRINKING WATER
                              Drinking  Water  Research
Major Outputs/Milestones

Provide the Health, Monitoring
and Engineering Data Necessary
to Develop and Revise Drinking
Water Regulations.

-  Provide reports on international
   symposia on the health effects of
   drinking water disinfectants and
   disinfection by-products.  (Health)

-  Provide report which evaluates
   the validity of extrapolation
   models for tumor promoters and
   initiators. (Health)

-  Prepare state-of-knowledge report
   on the removal  of organic  materials
   from drinking water. (Engineering)

Provide Health and Engineering
Information to Assist States  and
Municipalities 1n Complying With
Drinking Water Regulations.

-  Prepare annual  reports summarizing
   the occurrence, cases and  causes  of
   waterborne disease outbreaks by
   year. (Health)

-  Complete full scale evaluation of
   aranular activated carbon  treatment
   for solvent contaminated ground
   water (Engineering)

-  Complete research report on small
   system bacteriological sampling
   frequency models. (Engineering)

-  Prepare report on techniques for
   control  of bromine-containing
   trihalomethanes. (Engineering)

-  Provide report on candidate         !
   methods for tracing microbiol-
   oaical contamination in outbreak.
   (Health)

-  Prepare annual  reports summarizing
   the occurrence, cases and  causes  of
   waterborne disease outbreaks by year.
   (Health)
Actual
 1982
 Current
Estimate
 1983
Estimate
 1984
 8/82
 2/87
              6/86
 2/87
              1/85
              6/86
  2/87
 9/84
 1/86
 2/86
 4/83
 9/82
12/85
              1/86
 1/86
 2/86
 12/86
              1/86
  1/86
  2/86
9/83
 9/84
                                       OW-10

-------
                                    DRINKING WATER
                              Drinking Water Research
'Major Outputs/Mil estones

-  Produce report on maintaining
   microbial quality in distribution
   systems. (Engineering)

-  Report on removal of volatile
   organic chemicals from drinking
   water by aeration. (Engineering)

Provide Scientific Methods and Data
for Protection of Ground Water
Resources.

-  Establish ground water research
   program for locating abandoned
   wells, fluid movement In injection
   wells, and modify and develop
   monitoring equipment and instru-
   mentation (continuing). (Monitoring)

-  Preliminary report on methods of
   locating abandoned wells (Env.
   Processes.)

-  Manual for the use of tracer tech-
   nology in ground water Investiga-
   tion. (Env. Processes)

-  Report on the characteristics and
   and quantity of naturally-occurring
   organic materials In subsurface
   environments (Env. Processes)

-  Report on the cost-effectiveness of
   various aquifer restoration methods
   (Env. Processes)

Provide Quality Assurance Support to
Agency and State Drinking Water
Laboratories.

-  Conduct 10 Regional Laboratory
   Certification performance
   evaluations. (Monitoring)

-  Produce and distribute
   52,000 quality control and
   performance evaluation
   samples. (Monitoring)
Actual
 1982

  3/84
  3/84
 Current
Estimate
 1983

 3/84
 3/84
Estimate
 1984

  3/84
  3/84
 9/82
 9/83
  9/84
 9/83
 9/83
              9/84
              9/84
              9/84
              9/84
  9/84
 9/84
  9/84
             Ongoing
 Ongoing     Ongoing
             Ongoing
             Ongoing
                                           DW-11

-------
                                   DRINKING WATER


                              Drinking Water Research
Budget Request
     The Agency requests a  total  of 520,899,800 and 142.1 permanent workyears  for
1984, a decrease of $2,423,400 and an Increase of 6.0 permanent workyears from 1983.
Included in this total  1s 58,991,800 for  Salaries  and  Expenses  and  511,908,000  for
Research and Development, with a  decrease of $473,100  and  $1,950,300  respectively.
The decrease primarily occurs  1n  the environmental  engineering  and  technology pro-
gram element.   In  addition, the  decrease  reflects the  transfer of $1,904,300  in
exploratory research funds to the Intermedia program.

Program Desert pti on

     EPA's drinking water  research program provides support  to States and  to  the
EPA Office  of Drinking  Water  (QDWV In  implementing  the  Safe  Drinking Water  Act
(SDWA) in  the  areas   of  contaminant  occurrence  and  health  effects,  analytical
chemistry, and control technology and  related  costs.   It also  develops  the  perti-
nent information required to support the protection of our ground water resources.
The following  represents  those   objectives  designed  to  Implement this  program.

     Objective 1.  Provide the Health,  Monitoring and Engineerlng Data  Necessary
Develop and Revise prinking Water Standards,  rhf s''research '"supports ODlif	in  devel-
oping revised  regulations   (including  Health  Advisory guides to States  and  sup-
pliers) to  control  drinking water contaminants  under  Section 1412  of  the SDWA by
conducting research In the  areas  of scientific assessment, monitoring, health  ef-
fects, and  treatment  technology.   It  also  provides  analytical  procedures  for  use
by the Agency,  States, municipalities  and operators of  drinking water systems to
monitor contaminants to assure that levels  established under the SDWA  are not  ex-
ceeded and  concentrations  measured are accurate  pursuant to Section  1401  of  the
SDWA.

     Objective 2.  Provide Quality  Assurance  Support  to Agency and State  Drinking
Watei^taboratories.   This research develops systems performance procedures for ori-
site evaluation  and certification  of  drinking  water  monitoring laboratories  and
makes possible mandatory  quality   assurance  activities   of all laboratories  and
offices Involved with data collection.   This ensures the  production  of  accurate and
reliable parameters in support of regulations and standards.

     Objective 3.   Provide Health and Engineering Information to Assist States  and
MunicTjjallties In Complying Ml th  Drlnking Water RMUlgWw.   health  researchIsT
sists^the States In ascertaining  causes of  waterborhe^lrifectious disease outbreaks
and Improving reporting of  these  incidences,  as well as determining the hazard to
humans from exposure to infectious agents through drinking water.  In  control tech-
nology, this  research  Is  directed toward  the compliance and  reporting  problems of
small systems.  This work  supports technical  assistance  to States  and  municipali-
ties as required by Section 1442  of the SDWA.

     Objective 4.  Provide  Scientific  Methods  and Data for Protection of  Ground
Water Resources.  This research  provides  the scfentff-ic  oasis   for the protection
of underground drinking  water  sources as  required to  Implement Sections  1421  and
1424 of the SOWA.  The goals are  to  (1) reduce the cost  of ground water contamina-
tion investigations; (2)  improve  the capability of predicting organic  and microbio-
logical contaminant behavior;  (3) determine the  appropriate level  of protection;
and (4)  determine   whether  1n-s1tu  aquifer restoration   1s  cost-competitive  with
other alternatives once ground water 1s contaminated.
                                         DW-12

-------
SCIENTIFIC ASSESSMENT

1984 Program Peguest

     The Agency  reouests  a total  of $224,100 and 3.0  permanent workyears for this
program, of which 5193,600 is for Salaries and Expenses and 530,500 is for Research
and Development.  This  reflects  an increase of 5109,200 for  Salaries and Expenses
and 2.0 permanent  workyears  with  no  change for  Research and  Development.   This
Increase reflects the need for additional resources to develop human health effects
documentation under Section 1412 of the SDMA.

     Prgvi de the Health , Moni toring and Engi neerinp Data Necessary to  Bevel op  and
Revise Dri'nkTng_WateF Standards".  Estimates  oT  potehti al   hazard  Eo  human  health
"from exposure to  chemicaV constituents in drinking water  are  necessary  to support
regulations and  Health  Advisory  guidance.  Revised primary drinking  water regula-
tions must be finalized  by  1986.  Health  assessment  documentation for  five chemicals
will be finalized and development initiated for six more contaminants.

1PP3 Program
 •  '  ..... ,J
    1 In 1983, the Agency  is  allocating a total  of $114,900 and 1.0 permanent work-
year to this program, of which $84,400 is under the Salaries and Expenses appropri-
ation and  $30,500  is for  extramural  purposes  under  the Research  and  Development
appropriation.

     Provide the Health, Monitoring  and Engineer Ing Data Necessary to Develop  and
Revlse^prlnkinq water standards.   Tfie  initial  drafts   of  health effects  documents
dealing with  sfl vef,  l , i-di chl oroethane,  and mercury  are being  prepared.   After
peer review, these documents will  be revised and released to the public for comment
in mid- 1983.

V9P3 Explanation of Changes from Budget Estimate

     There was no change to this  prooram.

     AecoropVi^shments
     In 1982, the Agency obligated a total  of $10,700 for  this program, all of which
was under the Salaries and Expenses appropriation.

     Provide  Health, Monitoring  yd Engineering Data Necessary to Develop and Re-
vise Drinking Water standards.  Technical  support  was  provided  55  the  ODft.   A
report evaluating  the  disposition and toxicity  of  uranium was  prepared  including
the estimation of safe drinking water levels.

TECHNICAL INFORMATION AND LIAISON

1 982 Accomol 1 shments
     In 1982, the  Agency  obligated a total of 5197,600  for  this  program,  of which
$186,600 was under the  Salaries  and  Expenses  appropriation and  $11,000  was for ex-
tramural purposes under the Research antl Development appropriation.  This activity,
which supports research programs across all media, was consolidated into the Inter-
media program in  1983.   Thus,  the Program Description, 1984 Program Request,  1983
Program, and 1982 Accompli shments narrative sections appear there.           ., ~

MONITORINGSYSTEMS AND QUALITY ASSURANCE

1984 Program Reauest

     The Agency  requests  a total  of $2,140,800  and  22.1  permanent  workyears  for
the program, of wtn'ch $1,437,500  is  for Salaries and  Expenses,  and $703,300 1s  for
                                        OW-13

-------
Research and Development.   This  reflects an  increase  of $217,700 in  Salaries  and
Expenses and a decrease  of  $20,400  in  Research  and  Development.   This  net increase
reflects the  strengthening   of  the  drinking water  duality  assurance program  by
increasing the  frequency of  regional  laboratory audits  since these  laboratories
are responsible for quality assurance certification  of State laboratories.

     Provide the Health, Monitoring and  Engineering  Data Necessary to Develop  and
Pevise Drinking Water Standards.   This program  is directed towards  supporting  the
National Interim Primary Drinking Water  Regulations and the  SDWA.   Standardization
of cost-effective analytical methodologies is a  critical  component for substantiat-
ing regulatory actions.   Because  of this, research  will  be conducted  to evaluate
methods for  measurement of  radiohuclides  in drinking  water, to  evaluate sampling
holding times for microbiological analysis of drinking water, and to assess alternate
membrane filter media for analyzing total col i forms.

     Provide Quality Assurance Support to Agency  and  State Drinking Water Labora-
tories^Research  under  this  objective  provides Quality  control  procedures  and
gulden nes to  document  data  quality  and  systems  performance,  provides  quality
assurance support in  radionuclides  analysis  of  drinking water samples,  and serves
as referee laboratory.  It also provides  an overview of Agencywide  mandatory quality
assurance activities of  all laboratories and  offices involved  with  data collection
for drinking water.   In addition, the program produces  and distributes  quality con-
trol/ performance evaluation  samples  for chemical and  microbiological  analysis  for
the water supply laboratory certification proqram and  develops and  distributes  ra-
dioactive standards and  reference  materials  for  radiochemistry analysis.   In 1984,
support for the State laboratory certification program will  be expanded to include
annual certification of EPA regional laboratories rather than the  current certific-
ation of every  three  years.  (EPA  regional  laboratories provide  certification  of
State and supplier laboratories).

     Providei Scientific Methods   and Data for.Protection of Ground Water Resources.
Research under this  obJecfTve 1sdesignedto evaluate and  assess  new methods  or
emerging technologies to protect our ground water resources.  Work will be directed
to assess well  sampling equipment and instrumentation,  and to assess non-contamina-
ting submersible pumps for monitoring water  supply wells.   Ttie use  of  fiber Optics
and laser technology to  monitor  ground  water quality  will  be evaluated.   Further
work on the use of airborne and  surface-operated  instrumentation  to locate abandon-
ed wells will be addressed.  The feasibility  of mapping  underground  fluid movement
from injection wells will be investigated.

1-9P3Program

     In 1983,  the  Agency, is  allocating  a total  of  $1,943,500 and  22.1  permanent
workyears for this prooram,  of which $1.,219,.800  is  under the Salaries  and Expenses
appropriation and  8723,700  is   for extramural   purposes  under   the  Research  and
Devel opment appropriation.

     Provide the Health, Monitoring and  Engineering  Data Necessary to Develop  and
Revise Drink|ng water Standards.the proqram provides  for  the evaluation of methods
for measurement °T rarfidnucTTde's, chemicals and microbiological  analyses in drinking
water.  Evaluation of sample holding times for microbiological  analysis of drinking
water, and development of alternate membrane filter media for analyzing total coli-
forras is included.

     Provide Duality Assurance Support to Agency andStateDrinking Water Labora-
torieTI  This program provides quality assurance support ini radibriucTides, chemical
and microbiological  analyses  of  drinking water samples; serves as  referee labora-
tory; and provides an overview of Agencywide mandatory quality assurance activities
of all laboratories and  offices  Involved with  data  collection for  drinking water
supplies.  In  addition,  the program  supports the production  and distribution  of
quality control and performance  evaluation samples for chemical  and microbiological
analysis for water  supply laboratory  certification,  and develops  and distributes
radioactive standards and reference materials for radiochemistry  analysis.
                                        DW-H

-------
     ProvideScientific Methodsand pata  for Protection of Ground Water Resources.
The program provides for the assessment of well  sampling equipment and non-contami-
nating pumps.   The use  of  fiber  optics  and  laser technology  to monitor  ground
water quality is  being  evaluated.   A report  on  the feasibility  of using  airborne
and surface-operated instrumentation to locate abandoned wells  is being evaluated.
Alternate test  procedures  for  chemistry, microbiology and  radiocheniistry  are  also
being evaluated.

1983Explanation of Changes from Budget Estimate

     The net increase of +$199,300 results from the following action:

     -Congressional Action.  ( + 5199,300)  This  increase  includes +5199,300  of the
510,5 nin lion Salaries and Expenses add-on which supports the 480 additional  perma-
nent full-time workyears provided to the Agency.

1982 Accompl_1 shments

     In  1082,  the Aaency  obligated a  total  of  51,392,900  for this  program,  of
which .$910,4PO  was  under  the  Salaries  and Expenses  appropriation  and  $482,500
was for  extramural  purposes  under  the  Research  and  Development  appropriation.

     Provide theHealth,Monitoring and Engineering Data Necessary to   Develop  and
Revise Drinking Hater Standards.This  effort  included  the  provision  for  develop-
ing precise, accurate, and reliable total  measurement systems for monitoring  drink*
ing water supplies for official Agency use.  The program provided criteria  and  pro-
cedures  for on-site  evaluation and  certification  of laboratories associated  with
drinking water monitoring  and  analysis,  and provided evaluation  of alternate  test
procedures.

     Provide Qua 1 ity Assurance  Support ..to Agency and State  Drinking   Hater Labora-
torie~s~.  ruis effort provided qualTty control procedures and guidelines to  document
data quality  and   systems  performance;  provided  overview  of Agencywide  mandatory
quality assurance activities of all  laboratories and offices  involved with data  col-
lection  for drinking water; and provided support for the production and distribution
of Quality  control  and  performance evaluation samples  for  radiocheroical,  chemical
and microbiological analysis of drinking water supplies.

     Provide ScientificMethodsand  Data for Protection of Ground Hater Resources.
The program provided support for conducting feasibility studies for a  hatTonal  pro-
oram to locate abandoned wells, and investigated the feasibility for mapping  under-
ground movement from Injection wells.

HEALTH EFFECTS

19S4Program Request

     The Agency requests  a  total  of $8,749,800 and  49.6 permanent  workyears for
this program, of  which $3,530,700 is  for Salaries and Expenses  and  $5,219,100 is
for Research and Development.  This reflects a decrease of $398,000 in. Salaries and
Expenses, and Increases  of $21,000  1n  Research  and Development  and  6.0  permanent
workyears.  The decrease  of 5398,000  In  Salaries  and  Expenses  results  primarily
from an  accounting change.  In-house research  support  contracts, formerly  funded
out of the  Salaries and Expenses appropriation, will  be  funded  in the Research and
Development appropriation where  1t  is  more appropriately charged. The increase in
Research and Development reflects a" increased emphasis on disinfectants and disin-
fectant by-products,  and  1t also  reflects  the transfer  of exploratory  research
funds to the  Intermedia program.  The increase  in permanent workyears reflects the
consolidation of  water-related  health   Issues  under  the   Drinking  Water  media.

     Provide the Health,  Monitorinq and Engineering Data  Necessary  to Develop and
Revis e"Drinjcing 'fater standaird s.  The health  effects research  program under  this
ob j ective Ts  desicihed:   (I) to  produce dose-response data  on  organic,  inorganic,
                                        DW-15

-------
and microbiological  contaminants in  drinking  water which  occur naturally  or  are
caused by  disinfection  or the  distribution  system; (2)  to develop  improved  test
methods for  developing   such  dose-response data;  and  (3)  to  develop methods  for
improving the ability to perform risk assessments.

     Health research  on  selected contaminants  such as chlorinated  ethanes,  vinyl
chloride, chlorobenzene,  asbestos,   barium and  fluoride   will   be  completed  this
year.  Tin's research  will  help  support ODW in evaluating  contaminants for possible
maximum contaminant levels (MCLs) or Health Advisories.

     The relative  hazards  associated  with the use  of  each  of  the following disin-
fectants and  their by-products  remains to  be  established.   Health studies  will
he conducted  on  disinfectants such  as  chlorine, chloramine, and  chlorine dioxide
and on byproducts  of the  disinfection  process.   Short-term and in  vivo  bioassays
will be applied to evaluate the carcinogenicity and mutagenicity bT these chemicals
as well as the potential for reproductive hazards.

     •Research will  also  be performed to  improve methods   for  extrapolating health
research data.  The  results  of this  research  will help  determine the  most appro-
priate models  to  use for  different chemicals  in  risk assessments,  and,  further,
will contribute to  resolving  the controversial  issues of  extrapolating  from high
to low dose  and  between  species.   Since  the  majority of  chemicals  that  occur in
drinking water have not  yet been identified  and human  exposure  occurs in mixtures,
research will  also  be conducted to  assess the risks  associated  with simultaneous
exposure to  multiple  chemicals  1n  complex  mixtures.   This  research is  aimed at
determining whether these  as  yet uncharacterized  chemical  mixtures  pose  a health
risk.

     Microbiological contaminants  will  also  be investigated.    This . research  is
focused on development  of methods-for  concentrating, isolating, and  identifying
infectious disease  agents  from drinking  water and human  samples to  use  in deter-
minina waterborne health hazards.  Methods will be developed for bacteria, viruses,
parasites, and newly recognized or known agents of waterborne disease.

     Provide Health and Engineering Information to Assist States and Municipalities
in ComDVying~with Drinking Hater Regulations"  Section 1442 of  the  SDWA authorizes
the Administrator to  provide  technical  assistance to  the  States or  publicly-owned
water systems  to  assist in responding  to and  alleviating  any  emergency  affecting
public water  systems  which  present  a  danger to  public  health.  Health  research
under this objective  will  design the  most cost-effective  methods  to Identify  and
evaluate outbreaks  of waterborne  infectious diseases  in  order  to  aid  States in
Improving their reporting.  Assistance  will  be provided to the  States to determine
the cause of  outbreaks,  and  remedial  actions  will be recommended.   This  activity
will be  conducted  in conjunction  with  the  Centers  for  Disease   Control  (CDC).
Improved investigation and reporting methods  will be developed and published in
1984, based  on the  results  of  specific  projects  undertaken  in three  states.  A
publication on the  annual  occurrence  of  waterborne  infectious  disease  outbreaks
will be produced  describing the etiology of the outbreaks  and  the  number  of cases
of disease.

19P3 Program

     In 1983,  the  Agency  is  allocating' a total  of $9,126,800  and  43.6  permanent
workyears to this  program, of which $3,928,700  is  under  the  Salaries and Expenses
appropriation and  $5,198,100  is  for  extramural  purposes  under the Research,  and
Development appropriation.

     Provide the Health, Monitoring and Engineering  Data Necessary to  Develop and
Revise Drinking Mater Standards.  Tn  1983, emphasis  is  being  placed on  studying
disinfectants and  disinfectant  by-products,  methods  to  improve extrapolation of
toxicologies!  data,- and  investigations on the. interactive effects  of  mixtures of
known chemicals.   With MCLs scheduled to  be  promulgated by 1984, chemical-specific
                                       DW-16

-------
studies which  directly  support MCL development for  volatile  organic  compounds  are
windino down,  but  chemical-specific  studies to support Health  Advisories  are con-
tinuing.  A  report will be  issued on the  carcinogenic  activity of  chloroform  in
drinking water,  based  on  dose-response  data developed  in  long-term bioassays  in
rats and nice.   This  data  is  required  for final  promulgation of the trlhalomethane
standard.

     Provide^Jjealth and Engineering Information to Assist States and Municipalities
in CoffiptyingTjRth DrinKTng water Regulations.  Survei l1ance   and  investigation   of
waterborne disease "outbreaks  in cooperation with CDC are continuing.   Annual  sum^
maries of outbreaks and water system deficiencies are  to  be published.   Pilot pro-
jects in three states for determining  more effective  and sensitive outbreak surveil-
lance systems will  be completed.

1983Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Aceomp 11 shments

     In 1982,  the  Agency  obligated  a total  of J12.618.400  for this  program,   of
which 52,970,200 was  under the Salaries and  Expenses appropriation  and $9,64fl,20Q
was for  extramural  purposes   under  the  Research and  Development  appropriation,

     Proyide the  Health,  Monitoring and Enoineeri ng Data Necessary to  Devejop  and
Revise PrTnMrtg Hater Standards.  In 1982, toxicoTOgicalstudies focused on carcin-
genici ty, mutagenicity, and target  organ toxicity for volatile  organic compounds,
e.g., trichloroethylene, tetrachloroethylene, 1,2-dichlproethane and 1,1,1-trichlo-
roethane.  The data will be used  in MCL and Health Advisory development.   Research
on calcium, maanesium,  lead, and cadmium was ongoing to evaluate the  role of these
inoroanic chemicals found fn drinking water for cardiovascular disease.   Studies  on
the effects of lead on  brain development were completed.

     Provide Health and Engineering Information to Assist States and Municipalities
in Comely ing with Drinking Water Regulations.  Technical  assistance and  advice were
provirted to "states and  municipal 1 ties' on a  continuing  basis.   Health  effects staff
participated in on-site investigations of three waterborne disease outbreaks invol-
ving cases   of  viral  gastroenteritis and  cholera.  Three  studies were  underway  in
Colorado, Vermont,  and  Washington  to develop  innovative  approaches  to improve sur*
veillance of waterborne illness and  provide better accounting of the actual  incid-
ence of outbreaks,

EN VIROMMEHTAL E.NG I NEERI NG AMD TECHNOLOGY

1984 Program Reouest

     The Agency  requests  a total  of  S5,550,200 and 45.1  permanent  workyears  for
this proaram,  of which S2,722,800 is  for Salaries and Expenses  and  $2,827,400  1s
for Research and Development.  This  reflects a  decrease  of  $430,500 and $1,399,000
respectively, and  2.0  permanent  workyears.  These reductions reflect the decision
to stretch  out completion  dates  for projects which are not needed 1n the near term
in order to concentrate on  more immediate issues related to  near term  revision  of
the National Primary  Drinking Uater  Regulations  (NIPDWR).   This also   reflects  a
decision to transfer exploratory research funds to the  Intermedia program.

     Provide the Health, Monitoring andI Engi neeri ng Data  Necessary to Develop   and
Rev 1 sel^rinfcimi Water StanSarts,  This research fulfills a  continuing need to pro-
vide basic   data  on technology  and cost  to  the ODW 1n  support  of developing  and
revising the National  Interim Primary Drinking Water  Regulations and their prepara-
tion of Health Advisories.   Research will focus- on removal  of: (1) organics,  parti-
cularly volatile organic compounds  (VOC's)  of industrial origin;  (2) organics formed
during treatment;  and  (3)   naturally  occurring organic  compounds  responsible  for
                                        DW-17

-------
producing trihal omethanes.   Evaluation  of  those  treatment processes  still  in the
development staoe  for  removal  of  organic and inorganic  contaminants  and investi-
oation of existing technologies for making them more cost-effective will be address-
ed.  Research will be initiated on  removal  of newly identified  organics of concern
in water supplies.  Work on inorganics removal will concentrate on field testing of
various treatment  systems  in different  raw waters and under a  range of flow capa-
bilities.  EPA  will  emphasize  developing  cost information for  treatment processes
where such data is inadequate, and will  develop cost data for entire water systems.
This will  allow evaluation of  tradeoffs  in  planning  for  rehabilitation  of older
water systems and enhance overall  water utility planning and financing.

     Provide Health and Engineering Information to Assist States and Municipal iti'es
in CoiSpTylng With Drinking Water Regulations.  This research addresses  problems  of
small water utilities and assists States and municipalities 1n complying with MCLs.
Research will evaluate  treatment  processes  for  removal   of organic and  inorganic
contaminants.  Work will address the removal of volatile  organics  from ground water.
Evaluation, including costs,  of package  plants and  processes  such as  reverse  os-
mosis, ion  exchange,  filtration,  and  chemical  coagulation  for removing inorganic
contaninants will  "also  occur.   Work  on  disinfection  processes  suitable  for small
systems will  be emphasized.   Research  will  also  include  evaluation  of treatment
processes for removal of disinfection by-products.

19P3 Program

     In 1983, the  Agency  1s  allocating  a  total  of $7,379,700  and 47.1 permanent
workyears to this  program, of  which 53,153,300 is  under the  Salaries  and Expenses
appropriation and  54,226,400 is  for extramural  purposes  under  the  Research  and
Development appropriation.

     Provide the Health, Monitorina and Engineering Data Necessary to  Develop  and
Revise Prinking Water Standards.  Processes such  as  ion  exchange,  reverse osmosis,
filtration and  chemical  coagulation  are  being  evaluated  for  removing inorganics
including nitrate,  fluoride,  arsenic,  selenium,  barium,  and  radium  as  well  as
turbidity and particulate  matter.   Studies  are  also being  conducted  to determine
factors which contribute to corrosion of distribution system piping and to evaluate
methods of corrosion control.   Research  on removal  of microbiological  contaminants
is being  directed  to  remove  organisms  by physical-chemical treatment processes.

   •  Provide Health and Engineering Information to Assist States and Municipalities
in  Complying  Kith Drinking Water Regulations.ETA"7sevaluatingcost-effective
treatment technologies adaptable to the needs  of  small  systems.  Progress is being
made in providing  alternate  removal  techniques  for  organic  contaminants  such  as
activated carbon  adsorption, air   stripping,  coagulation,  and  oxidation.   Pilot
scale and  field testing  of  processes  for inorganic  contaminants Is  continuing.
Simple and  effective disinfecting  systems  for   use  in  small   systems are  being
evaluated.

1983 Explanation of Changes from Pudget Estimate

     The net Increase of +5500,000 results from the following action:

     -Congressional Action.  (+5500,000)  Congress added  +$8,526,200 to  the Research
and Development appropriation  for  priority  activities  at  the discretion  of  the
Aoency,  This  specific  increase  supports   regulatory   activities  by  evaluating
existing/new techniaues  for  Trihal omethane/volafile Organic  Compounds  (THM/VOC)
and radlonuclides removal from drinking water.

1982 Accomplishments

     In 1982, the  Agency  obligated  a  total  of  $11,826,400  for  this  program,  of
which $2,938,200 was under the  Salaries and  Expenses appropriation and $8,888,200
was for  extramural   purposes  under  the  Research  and  Development  appropriation.
                                       DW-18

-------
     Provi de the Heal th ,  Honi tori ng and Engi neeri ng   Data   Necessary  to Devel op  and
Revi se urinKing water Standards.     Research  Tin 1982  Ypcused  orilii gti  priori ty  areas
in support of riew and~revised drinking water  regulations.   This  included  evaluating
data for control of industrial  solvents found in  drinking  water  and treatment  tech-
nology for removal of disinfection by-products.  Work also continued  on  developing
standardized costing methodologies  for  drinking  water treatment unit  processes.
Specific outputs included reports on control of  trichloroethylene and other indus-
trial solvents  found  in  ground  water and  costs of treatment  processes used  for
drinking water treatment.
     Provide Health, and Engineering Infontiati on to' Assist Stjlg^. and Municipalises
in Complying with Drinking Mater Regulations.   Research  iri 1982 emphasized the needs
of small systems by providing data on the cost and efficiency of technology adaptable
to their needs for meeting MCLs.  A major effort was devoted to evaluating  technology
for removing  volatile  organic  chemicals  from  ground  water.  Treatment  processes
for removing inorganic contaminants in a cast effective  manner were  also  evaluated.
A symposium on the problems of  small  systems  in  complying with MCLs was  conducted
and well attended.

ENVIRONMENTAL PROCESSES AND EFFECTS

1984 Program Request

     The Agency  requests  a total  of  $4,234,900  and 22.3  permanent work/ears  for
this program,  of which 51,107,200 1s  for  Salaries and Expenses and $3,127,700  is
for Research and Development.  This reflects an  increase  of 528,500 and  a decrease
of 5551,900, respectively,  reflecting the transfer  of  exploratory   research  funds
to the  Intermedia  program.  Resources  for  ground water  research   remain  approxi-
mately the same as 1983 levels.

     Provide Scientific  Methods and Data for Protection of  Ground Water  Resources.
This research  will  focus on  the following three  areas:  (I)  improved  methods  for
determining the  transport  and  transformation  of  contaminants  in  the  subsurface;
(2) methods for  predicting the  behavior  of pollutants in aquifers based  on  subsur-
face (site-specific)   characteristics  and  on  characteristics  of  the  pollutants;
and (3)  evaluation  of aquifer  1n-s1tu  reclamation methods.  Outputs will  include
preliminary field evaluation methods for determining  the dispersion  of contaminants
in ground water and a manual  on the use of tracer techniques to detect fluid migra-
tion around injection wells in specific hydrogeologlc settings.   Transport and fate
research will integrate characteristics of contaminants  and  subsurface environments
in order to predict the Impacts of contamination on underground sources  of drinking
water.  This work also will include more complete  field evaluations of  microcosms,
models, and methods  for  determining  dispersion,  and  will result in  greater confi-
dence in the  predictive  capability of these  methods  and models.  Reports  on cost-
effectiveness of  various  technology  and management alternatives   In  the  aquifer
restoration area will  be produced  in  1984 and  on  costs  of incremental improvements
in ground water quality in 1985.

1983 Program

     In 1983,  the  Agency is  allocating  a total  of  $4,758,300 and  22.3  permanent
workyears to this program, of which $1,078,700 Is under the  Salaries and Expenses
appropriation and  $3,679,600  is  for  extramural  purposes  under the Research  and
Development appropriation.

     Provide Scientific Methods and Data for Protection  of Ground Water   Resources.
In the method's  area, detecti an  metnods  for  parame ters  important to transport' and
fate (such as  oxidation-reduction  potential) will  be evaluated.  Iff the  transport
and fate  area,   which  is directed toward  prediction of  contamination  Impacts  on
underground sources of drinking  water, laboratory  studies will  continue  to provide
data on how  organic  chemicals and pathogens of  concern behave  in  the  subsurface.
Research on sources of  ground water contamination  is being directed toward improving
                                         DW-19

-------
the technology  for detecting  whether injection  wells  are  contaminating  aquifers
and determining the  Impacts  of particular injection  wells.   In 1982,  research  on
in-situ aquifer reclamation  determined  the  state-of-knowledae concerning practices
that have  been  tried  -in the past.   In  1983,  methods  and data are  being developed
to determine the costs and applicability of such practices.

1983 Expl anatipn of Changes^jfrom Budget Estimate_

     There was no change to this program.

1982 Accomplishments

     In 1982 the Agency obligated a  total of  $4,866,600  for  this program,  of which
Sl,lfi7,000 was  under  the  Salaries  and Expenses  appropriation  and $3,699,600  was
for extramural purposes under the Research and Development appropriation.

     ProvideScientificMethodsand Dataon Protection of Ground  Water Resources.
The first  International  Conference  on "Ground Water  Quality' Research was  held  in
October, 1981 at  Rice University in Houston, Texas.   In early 1982, the  National
Ground Water Information Center was opened to scientists, government officials,  and
the public, enabling  computer-search  access to the  world's  around  water literature
through key ground  water-related words.  An  article  was published on  an  outbreak
of gastroenteritis and infectious hepatitis,  for the first  time demonstrating  the
occurrence and effects of viruses 1n a ground  water community water  supply.  Finally,
a method was developed  to  determine gross microbiological activity 1n  the subsur-
face, a first step in predicting the potential for biological degradation of chemi-
cals 1n around water.
                                        DW-20

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Tab 1_e of Co ntents



                                                                            Page

DRINKING WATER

    ABATEMENT S CONTROL
       Drinking Water Criteria, Standards 4 Guidelines	,	  DW-22
       Drinking Water State Program Resource Assistance..........	  DW-Z7
          Public Water Systems Supervision Program Grants.	  DW-28
          Underground Injection Control  Program Grants	......  DW-30
          Special  Studies 4 Demonstrations..	  DW-31
          Trai ni ng....	  DW-32
       Drinking Water Management	  OW-33
          Public Water Systems Supervision Program Assistance	  DW-34
          Underground Injection Control  Program.	  DW-37
                                      DW-21

-------
                                    DRINKING WATER

                   Drinking Water Criteria,  Standards 4 Guidelines

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE    ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS  1983

                                (DOLLARS IN  THOUSANDS)

PROGRAM
Criteria, Standards &
Guidelines
 Salaries & Expenses           $5,226.8   55,540.0   55,599.8   $5,168.8   -$431.0
 Abatement Control &           $2,249.7   $2,675.7   $2,675.7   $2,595.2    -S80.-5
 Compliance
                       TOTAL   $7,476.5   $8,215.7   $8,275.5   $7,764.0   -$511.5

TOTAL:
 Salaries & Expenses           55,226.8   S5,540.0   $5,599.8   $5,168.8   -S431.0
 Abatement Control 4           $2,249.7   $2,675.7   $2,675.7   $2,595.2    -$80.5
 Compliance

Drinking Water         TOTAL   $7,476.5   $8,215.7   $8,275.5   $7,764.0   -$511.5
Criteria, Standards 4
Guidelines


PERMANENT WORK YEARS
Criteria, Standards «              92.7       87.2       90.7       83,6
Guidelines

TOTAL PERMANENT WORKYEARS          92.7       87.2.      90.7       83.6


TOTAL WORKYEARS
Criteria, Standards &             111.5      102.2      105.7      100.5      -5.2
Guidelines

TOTAL WORKYEARS                   111.5      102.2      105.7      100.5      -5.2
                                       DW-22

-------
                                   DRINKING WATER


                          Criteria, Standards & Guidelines
Budget Request
     The Agency requests a total of $7,764,000 and 83.6 permanent workyears for 1984,
a decrease  of  $511,500 and  7.1  permanent workyears from  1983.    Included  in this
total is $5,168,800 for Salaries and Expenses and $2,595,200 for Abatement,  Control
and Compliance, with decreases of $431,000 and $80,500,  respectively.

Program Description

     This activity  represents the  entire Headquarters   component  of  the  drinking
water abatement & control program.  This involves the following:

     Regulations^ Develqpment 4 Rey^ew:  EPA has  the responsibility  to review  and
revise'the  existing'	National Prflary Drinking  Water Regulations  (NPOWR) in  light
of latest  scientific and  field  evidence  and,  as  necessary,  to  augment  existing
regulations with  standards  for  newly  identified  contaminants.    This  requirement
also provides  EPA an  opportunity to  consider   innovations  in current  regulatory
requirements to  relieve the  unwarranted  administrative burden  on  State  programs
and the systems themselves.  The Information to  be assembled and  considered  relates
to occurrence  of  contaminants,  their potential  for adverse human health  effects,
relevant treatment  technology,  monitoring  and  reporting  needs,  and  the  economic
impact of  regulatory requirements.   The  NPOMRs  contain  quantitative limits  for
harmful contaminants, in  the  form  of  Maximum  Contaminant Levels  (MCLs), as  well as
rules for measuring and reporting contaminant levels.

     The Safe Drinking Water Act prescribes a decision-making procedure for  promul-
gating Revised  NPDWR  in which  EPA must make two distinct  determinations.   Before
an MCL may be set, EPA must determine by rule the level  which precludes any  adverse
health effect,  referred  to  as a "Recommended MCL"  (RMCL).  The enforceable MCL is-
then proposed and promulgated at  a level  which  is as close to the RMCL as  is fea-
sible using  generally  available  technology  (taking   costs  into  consideration).

     Complementing enforceable primary drinking water standards  are  health  adviso-
ries prepared by  EPA.   Health advisories  are written for  unregulated contaminants
in response to  situations such as  spills or detection  of  contaminants.  They  are
used principally  by  State and  local  health officials  to  determine  the course of
action to  take in  these  potentially  health-threatening  situations. - The  health
advisories contain a  summary of  scientific  Information on  health risks posed by
contaminants without MCLs  but which may occur  in  some  water  supplies, as  well as
methods for identification and removal of contaminants.

     Together, MCLs and health advisories  serve  as benchmarks for public health pro-
tection not only  in  regulating  drinking water supplies  but also 1n  other  environ-
mental  protection programs,  notably those  for  managing hazardous waste  disposal.
Laboratory and  technical   support  capacity  Is  required  for  regulatory  decision-
naking, helping  to  define  monitoring  requirements, conducting  national  sampling
surveys essential   to  establishing  national   exposure   patterns,   and  evaluating
performance of treatment processes.

     Finally, EPA has the  responsibility for  establishing Underground  Injection
Control program regulations  for preventing  contamination  of  underground  drinking
water sources  by  well  injection  of  fluids.   The  SOWA prohibits all  underground
injection that  has  not been  sanctioned by appropriate EPA or State regulations.
Program regulations  were  promulgated   in  1980' and 1982.   EPA  \%  now  reviewing
State applications  for  primacy  and  preparing  to  implement  programs  where  the
States cannot or decline to do so.
                                        DW-23

-------
     Implementation of PHS and UIC Programs:   To assure that the ultimate objective
of safe drinking water for the public ?s"niet,  Headquarters must supervise implemen-
tation by  EPA  and  the  States  of regulatory  programs  that apply  NPDWRs and  UIC
regulations.  This  includes  preparation  of   guidance  for  better,  more  effective
implementation, guidance  to  States  to  incorporate  regulatory changes,  oversight
of grant  allocations,  and  collection  of compliance  data  nationwide   to measure
environmental  results.  This also includes provision of  central  activities such as
data management,  allocation  of  State  grants, and  other financial  management  and
program planning work.

     Ground Water Protection:  To develop  a   consistent effort  to  protect  ground
water, the Agency will reorient  current programs to  emphasize  groupd  water protec-
tion goals, and  work with  States to  develop their own ground water  strategies.
The Headquarters   program   will  coordinate  ground  water  activities  within  EPA,
undertake analyses  of  current policies and regulations  and recommend  guidance  on
crosscutting issues  for  Agency decision-making, and work  with  Regions  to develop
effective support for States in strategy development.

     In addition,  States  and communities  frequently call  upon  the laboratory  and
technical  services capacity maintained for the development of standards  and  regula-
tions when drinking  water  supplies  are put in  jeopardy by contamination of  water
sources.  This  capacity  helps  identify,   assess,  and   control contamination  that
poses a human  health risk.   As  new  work  proceeds under  the  Hazardous  Waste  and
Superfund programs  to  find  and  confine   contamination  sources, more   threats  to
drinking water  supplies  will  be discovered.    This  will  increase  the   demand  for
such advisory services.

CRITERIA,STANDARDS AND GUIDELINES

1984 Program Request

     The Agency  requests  a total of  57,764,000 and 83.6 permanent  workyears,  of
which 55,168,800  will  be  for  Salaries and   Expenses  and 52,595,200 will  be  for
Abatement, Control  and   Compliance.   This  represents   decreases of  $431,000  and
580,500 respectively  from  1983.  The reduction  of S8jO,500 in  Abatement,  Control,
and Compliance  reflects   completion  of gathering  of   background  information  for
the revision of  the  National  Primary Drinking Water Regulations.  The  decrease of
7.1 permanent  workyears  reflects the  completion  of certain  standards  development
work and a  reduction  in  national  management  oversight  of  the  Public  Water  Systems
Supervision program.  The reduction  of 5431,000 in  Salaries and Expenses reflects
the workyear reduction and decreased  ADP contract costs.

     Development of Revised National  Primary  Drinking Water Regulations  to supplant
standing Interim  Regulations  will be  the  centerpiece of regulatory  development and
review efforts in 1984.   In the beginning  of  the fiscal  year,  RMCLs  for inorganic,
microbiological, and  some   pesticide   contaminants  will   be   ready  for proposal.
Simultaneous promulgation of  RMCLs and proposals of enforceable MCLs (as required
under SDWA) will  occur by  the autumn  of 1984.  The proposals will  reflect measures
to relieve the  regulatory burden  developed through  national  workshops.   Similarly,
promulgation of  RMCLs and  proposal  of  MCLs  relating to volatile organic contami-
nants will  occur during  the year.   Since EPA  must proceed  with  development  of
RMCLs before it  can  address  the official  MCLs, final promulgation of both sets of
regulations would occur in 1984-86.

     This will  leave  regulatory  provisions for radionuclides  and organic contami*
nation arising  from  disinfection  to be  reviewed and finally promulgated as  Revised
NPDWRs,  This  work  will  begin in  1984.  Completion of  the national  occurrence sur-
vey in  1984  for inorganics  and radionuclides will   support consideration of  radlo-
nucllde standards.
                                        DH-24

-------
     The last group  of Interim standards  to  be reviewed for revision will  be the
Trihalomethane (THM)   regulations,  promulgated  in  1979.   It  was  recognized  when
these regulations  were put  into  effect that THMs  were only  one  kind of  organic
chemical by-product from disinfection.  As such, THMs are only a  small  fraction  of
the total  organic  content found in drinking  water,  and the overall  adverse human
health potential  remains  largely  undetermined.  In  reviewing  whether the  current
MCL and  monitoring requirements  for  THMs  provide  adequate protection,  EPA  must
address the  broader   issue  of  health  risks  posed  by  both the  higher  molecular
weight organic contaminants  in finished  drinking water and alternative  disinfec-
tants themselves.  The regulatory review  will  begin  its work in 1984  based on the
current work  of  the  Research  and Development  program's health research  efforts.
Proposal of  revised   regulations  in  all these  categories  will  better define  the
list of  chemicals  for which  health  advisories will  be necessary;  preparation  of
further advisories will proceed.

     Full UIC program primacy for an additional  12 States is expected to be granted
in 1984, bringing  the  total  number  of  UIC  primacy  States  to 39.   As  the  press  to
delegate UIC programs  winds  down, the emphasis will  shift to  providing  the proper
program guidance  to the nationwide UIC program to ensure consistency of implementa-
tion.  EPA will  continue to encourage  those  remaining  States without programs  to
assume primary enforcement  responsibility.   Compilation  of nationwide  compliance
information will  begin, providing  the UIC program a  baseline from  which to consider
changes to program technical  requirements.   The  companion compilation for nationwide
compliance with PWS program requirements will  also continue,  as will  ongoing finan-
cial  management,  program planning, and policy direction.

     Work to pursue a  consistent approach to  ground water  protection will  proceed.
This will  include  development  of  guidance  on  cross-cutting regulatory issues  re-
lated to protection  of ground water  resources, assembly of technical  information
to support State  development of ground water management strategies, and preparation
of a relevant research agenda.

1983 Program

     The Agency  is allocating a total  of $8,275,500 and 90.7 permanent  workyears
for this program,  of  which  $5,599,800 is for Salaries  and  Expenses  and $2,675,700
is for  Abatement,  Control   and  Compliance.   Extramural  funds  are  required  for
projects to assemble  the  latest tdxicological  information  on  contaminants  of con-
cern, to  compile  data on  human  exposure  to  waterborne  contaminants  supporting
determination of  new  primary  standards,  to collect  data  on  treatment  technology
performance and  cost  and the  financial  impact  of  regulatory  requirements,  and  to
provide analytic  support and technical expertise to  address ground water contamina-
tion issues.

     An Advance  Notice of Proposed Rulemaking  for  review and revision  of Primary
Drinking Water Regulations  now in  force will  be Issued in 1983,  followed  by the
same kind  of  nationwide consultation employed  in development  of  VOC  regulations.
EPA will seek from participants their ideas on innovations, such  as more flexible
monitoring and reporting  requirements,  that  will  meet  the  basic requirements  of
regular monitoring  of  delivered  drinking  water to  assure its  safety.   Present
standards cover  inorganic, radionucUde,  and  microbiological  contaminants, turbid-
ity, and some  organic contaminants  (pesticides and  THMs).  A national  survey  to
characterize radionuclide  and   other  inorganic  occurrences  will   be  conducted  in
conjunction with  the  revision.  Recommended  MCLs  for  the  group   of VOCs  will  be
ready for proposal  during 1983.  Preparation of health advisories and other general
efforts to  delineate  potential  health risk  in  water  supplies  will   continue.

     During 1983, one of the highest program priorities will  continue to be proces-
sing State  applications  for UIC  primacy.   Twenty-three State  program delegations
are expected  to  be approved  during  the year.  , Another major effort will  be the
compilation of nationwide compliance data for public water systems for the previous
year.  The automated data reporting systems used to  facilitate this will be refined
                                        OW-25

-------
in light of the experience in  previous  years.   Applications  for sole source aquifers
will continue to  be  reviewed as received.  Management  of  State  grant allocations
and other  financial  management  and program  planning  tasks will  also  continue.

     During 1983, EPA  will  orient its  programs  to  protect ground water  supplies,
prepare the  ground  work  for  State-developed  protection strategies,  and  reinforce
ground water research efforts..

1983Explanation of Changes fromBudget Estimate

     The net increase of +$59,800 results from the following action:

     -Congressiona1  Action.  (+$59,800)   This increase  includes  +$59,800  of  the
S10.5 mill ion' Salaries and Expenses add-on which supports the 480 additional perma-
nent full-time workyears provided to the Agency.

1982 jAccomFiHshments

     In 1982, the Agency obligated 57,476,500 for this program,  of which 55,226,800
was for Salaries and Expenses and $2,249,700 was for Abatement,  Control and Compli-
ance.  Regulations development and review activities  involved consideration of  new
MCLs for  particular  volatile  organic  compounds  (VOCs)   found  with  considerable
frequency in drinking water supplies from ground water sources.   The formal  process
began with issuance  of an  Advance  Notice  of  Proposed  Rule Making  in March 1982,
starting a  series of  workshops  to  provide  nationwide  consultation  on  the  full
range of  issues  pertinent to  key  regulatory  decisions.    A  nationwide  survey  of
organic contamination in ground water source systems to establish specific chemical
occurrence and levels  was conducted.   Settlement  of the  last  legal  challenge  to
the THM regulations  resulted  in a  technical  amendment to  the  regulation proposed
in March 1982.  This resolved uncertainties over engineering remedies which systems
are expected to take to comply with the regulations.

     Health advisories  for 16 different compounds  were  prepared in 1982»   In addi-
tion, EPA has  responsibility to  assure  that substances  added to  drinking  water
either deliberately or  inadvertently  (i.e.,  from  corrosion) do  not  pose  a  human
health risk.  Efforts  were begun to arrange  for a third  party  to perform assess-
nents of the health risk of additives under EPA guidance.

     The first priority in  assuring  national  implementation of  the  UIC regulatory
program in 1982 was  to  review UIC program  applications  received from States.  The
process was completed for four States in 1982, and 20 additional State applications
were in various stages of review.  Guidance documents for direct EPA implementation
of the UIC  program  were  also  developed.   Through  compilation  of compliance data
for community water  systems,  EPA  developed a baseline  of drinking  water  quality
provided by  the  Nation's  systems  by  which to  measure  environmental  results.   A
companion effort developed  for UIC  will proceed as the State and  EPA programs  are
implemented.  The drinking  water  program  was  also  designated by  the  Office  of
Water to review the  information  requirements  of all  EPA water  programs to  stream-
line data collection.

     A proposed approach  to better  coordinate the  Agency's ground water activities
was developed.   Starting  from  the  prejnise that  States  have  the lead  role,  the
approach reviewed what  EPA can do to  support the States  and better implement  EPA
programs to protect the quality of ground water.
                                        DW-26

-------
                                    DRINKING WATER

                   Drinking Water State  Program  Resource  Assistance

                                ACTUAL   BUDGET      CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE -
                                           1983        1983              1984 VS 1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Public Water Systems
Supervision Program
Grants
 Abatement Control &          $29,456.4  $23,560.0  $27,450.0  $21,204.0  -$6,246.0
 Compliance
                       TOTAL  $29,456.4  $23,560.0  $27,450.0  $21,204.0  -$6,246.0

Underground Injection
Control Program Grants
 Abatement Control S           $6,379.9   $5,540.2   $7,074.5   $6,094.2    -S980.3
 Compliance
                       TOTAL   $6,379.9   $5,540.2   $7,074.5   $6,094.2    -$980.3

Special Studies &
Demonstrations
 Abatement Control &           $1,822.5              $1,900.0            -$1,900.0
 Compliance
                       TOTAL   $1,822.5        '      $1,900.0            -$1,900.0

Training
 Abatement Control S             $191.1                $169.0              -$169.0
 Compliance
                       TOTAL     $191.1                $169.0              -$169.0

Underground Injection
Control Implementation
Program
 Abatement Control &              $21.4
 Compliance
                       TOTAL      $21.4

TOTAL:
 Abatement Control &          $37,871.3  $29,100.2  $36,593.5  $27,298.2  -$9,295.3
 Compliance

Drinking Water State   TOTAL  $37,871.3  $29,100.2  $36,593.5  $27,298.2  -$9,295.3
Program Resource
Assistance
                                        DW-27

-------
                                    DRINKING WATER


                          State Program Resource Assistance
Budget Request
     The Agency requests a  total  of $27,298,200 for the Abatement, Control  and  Com-
pliance appropriation, of which $21,204,000 is for the Public Water Systems  Supervi-
sion Program (PWS) -and $6,094,200 is  for  the  Underground Injection Control  Program
(DIG).  This figure  represents  a decrease  of  $9,295,300 from  1953,  resulting in  a
reduction of $6,246,000 for PWS  grants,  $980,300 for DIG grants,  $1,900,000 for the
National Rural  Water  Association,  and 5169,000  for  the  fellowship program.   We  are
not requesting funds  to  support  the National  Rural Water Association  or to  continue
the fellowship program.

Program Description

     The intent  of the Safe Drinking Water  Act  is  that States  should assume  the
primary role for  implementing and  enforcing the drinking water and the underground
injection control  regulations.  Federal  financial  assistance, in the form of grants,
is provided  to  States to develop  and maintain  these programs.  To  be  eligible  for
grants, States must have primary  enforcement responsibility.

     Public Water System Supervision Program Brants — this  program  provides  grants
to States which  have  been  delegated  primary enforcement authority for  implementing
a Federally  approved  PWS  program.   EPA  may also  use the funds  allotted to  a  non-
primacy State to defray the cost of Federal implementation of the program.

     Underground Injection Control Grants — This  program supports State activities
in implementing the Underground Inject!oh  Control  program.   As  with  the PWS program,
should a State not accept program delegation,  EPA may use the  funds  allotted to  that
State for program  Implementation.

     Special Studies and Demonstrations — This  program  has  included  resources  for
th« National Rural Water  Association for training and technical assistance  to opera-
tors of small rural water systems.

     Training -- This  program has included funds for fellowships  to State  personnel
in the  drinking  water field,  in  both public  water  systems supervision and under-
ground injection control, and for academic grants.

PU8J.IC..WATER SYSTEMS SUPERVISION PROGRAM GRANTS

1984 JProgram Request

     The Agency requests $21,204,000 for Abatement, Control and Compliance for public
water system  supervision  grants.   This  represents   a  decrease  of  $6,246,000  from
1983.  Greater State self-reliance may be expected for PWS programs since most States
have had over four years  of program primacy.   States may  offset these  reductions  by
introducing user  fees  on water  systems; to pay  for  State costs for portions  of the
program.  These funds will be used by the States or by EPA for implementation activi-
ties in  all 57  States and Territories  and  on  Indian   lands.   Because the States
match Federal  support almost dollar for  dollar,  the 23%  reduction  to  the Federal
portion of  this  program translates  to approximately half  of   that  reduction to the
total State and Federal program.

     .These  resources  will  fund  State activities to  improve  compliance  with  drinking
water regulations  and  to  respond  to Incidents  in which  the  safety of  drinking water
supplies is  threatened.  These include program 'and financial management, development
of State annual  reports,  maintenance  of emergency  response  plans,  and  granting  of
variances and exemptions.   The Agency  is  considering the need  for establishing regu-
lations for  volatile  organic contaminants (VOCs).  Should it be  determine  that  VOCs
                                        DW-28

-------
pose a health  risk and  regulations  are  developed, the  States  then  will  be required
to initiate regulatory  changes  to include  this  requirement and  to  begin to certify
State laboratories  for  conducting   analyses  required  by  this regulation.   They
will maintain  inventories  of public water systems  and recordkeeping  systems  for
compliance data.  The  States will  also provide  surveillance  and  technical  assist-
ance to public water systems by conducting sanitary surveys, collecting and analyz-
ing samples, and reviewing sampling  data submitted by the systems and laboratories.
By developing  expertise at the  State  level  through  training,  the  States  are able
to provide  advice  and  assistance   to  public  water   systems  regarding  operation,
maintenance, treatment, and quality  control.  This type  of assistance  will  contri-
bute to attaining full  compliance.

1983 Program

     The Agency  1s  allocating  $27,450,000 for  public  water  systems  supervision
grants to 57 States under Abatement, Control  and  Compliance.   Changes  were made to
the Agency general grant,  regulations  to  provide EPA the use  of grant funds allot-
ted to non-primacy States  for  direct Implementation  activities.  Fifty-one primacy
States are  receiving  grants, and the  Regions are using the  funds  allotted to  the
remaining six  non-primacy  States  for  £PA  implementation  activities.   The  States
continue to maintain their current  programs by  providing the  necessary  administra-
tive functions requisite for smooth  operation of the program  such as program plan-
ning and management,  compilation of annual compliance  reports, and maintenance of
an emergency  response   capability.   They  also  assist in  the  event of  waterborne
communicable diseases and  direct their efforts toward those  instances  where major
health threats are involved.

1983 Explanation of Changes from Budget Estimate

     The net Increase of +33,890,000 results from the following action:

     -Congressional  Action.  (+$3,890,000)  The  Congressional  add-on  to  this  ac-
tivity of +$3,890,QdQ  to  the Abatement,  Control  and Compliance  appropriation  was
for the State drinking water grants  programs.

1982Accomplishments

     The Agency obligated  $29,456,400  under  Abatement,  Control and  Compliance to
the 50 States and Territories which had assumed primary enforcement responsibility.
During 1981  the compliance  rate  among  the  59,000  community systems  with  the
microbiological MCL was 91.55.   Of  the systems  not  complying, less than  1% were
persistent violators,  a decrease of over 665 from 1980, when 3% of the systems were
persistent violators.    While the final  figures  for 1982 are  not yet  available, 1t
is estimated that the compliance rate will continue to Increase.

     Maintaining compliance through  surveillance and technical assistance  was  the
major activity funded by the grants.  Emphasis was also  placed  on  conducting sani-
tary surveys 1n systems which proved to be persistent violators of bacteriological
or turbidity  requirements  or  violators  of  other MCL  requirements.   The  States
followed up to  ensure  compliance was  achieved  and,  when  necessary,  initiated  en-
forcement actions.    A  portion  of  the grant was  devoted to  ongoing  management
activities, which included coordination1 with  other State  and Federal  programs  and
local  institutions,  preparation of  regulatory changes required by State legislation
or Federal  regulatory amendments, administrative activities, and grants management.

     Other major accomplishments  included the  assurance that  systems  were effec-
tively monitoring for compliance with  the trihalomethane (THM)  regulations.  These
regulations were promulgated  by  the Agency  in  November 1979  and required  that
systems serving populations  between 10,000  and  75,000  begin  monitoring  for THMs
1n 1982 with  full enforcement  of the regulations 1n  1983.  By  the end  of 1982, 31
States had adopted the THM regulations.
                                        DW-29

-------
UNDERGROUND^ iNJECTIOH CpNTROlJ>ROGIW _GRANTS

1984 Program Request

     The Agency  requests  $6,094,200  for  Abatement,  Control  and  Compliance,  a
decrease of 5980,300,  which reflects  savings  due to program  reform,  particularly
by providing  greater flexibility  in  program  implementation  and  simplifying  ad-
ministrative requirements and  State reporting  requirements  for  the  grants.   The
funds will support State and EPA implementation of the UIC program in all  57 States
and Territories and on  Indian  Lands.  States must have primacy to be  eligible  for
funding.  During 1984,  an  additional  12  States will  achieve primacy, leaving  18
States and Territories  and  Indian   lands  where  EPA  must  implement the  program.

     The States or EPA  will  initiate   or  continue permitting  activities  for  new
Class 1 (waste disposal), II (oil  and gas), and III (mining)  wells, conduct on-site
inspection of Class I, II, and III wells to  ensure that no  contamination  of under*
ground drinking water sources occurs, monitor compliance reports, oversee mechanical
integrity testing   to  ascertain whether or not wells  are properly  constructed  to
prevent possible contamination, and  begin  the closure  of  wells injecting hazardous
waste into underground  water sources.   The  States will   also  develop  an  emergency
response program which will provide  them with a  greater response  capability in  the
event of an emergency.

1983 Proaram                    i
     The Agency is  allocating $7,074,500 under  Abatement,  Control  and  Compliance
for use in  Implementing Underground  Injection  Control  programs.   Grants will  be
awarded to the 39 States  which either have primacy or are  working toward primacy.
EPA will use the funds  allotted to the  remaining  States for direct Implementation.
At this time,  States  are  at various stages of implementing  the UIC programs.  The
primacy States will  begin  Issuing  permits  for new Class  I,  II  and III  wells, con-
ducting on-site surveillance  Inspections,  and collecting and  reviewing  mechanical
integrity testing  data.  In the remaining  States  which have indicated their intent
to assume primacy,  emphasis  will  be placed on program  development activities such
as completing the necessary  regulatory  and statutory  revisions,  conducting  public
hearings,  developing primacy  applications,  conducting  inventories,  and  completing
aquifer maoping.  Depending upon  when  these States apply for  and  receive primacy,
a percentage of their grant could support the initiation of permitting and surveil-
lance activities,    EPA direct  implementation activities  will  Include  developing
State-specific regulations,  publishing  the proposed  program in  the Federal  Regis*
ter, starting the  assessment of Class V (miscellaneous injection) wells, establish-
ing procedures  for  review and  issuance of permits,  and reviewing  and  organizing
data as well  as establishing  a  data system  to  maintain inventory  and  compliance
data.

                 of Changes from Budget Estimate
     The net Increase of +$1 ,534,300 results from the following action:

     -Congressional ; Action.  (+$1,534,300)  The  Congressional  add-on  to  this  ac-
t1 v1 tyJ°bf '+Sf ~,$S 1,300" to P the Abatement,  Control  and Compliance  appropriation  was
for the Underground Injection Control State grants program.

     Accompli ishments
     The Agency obligated  a  total  of $6,379,900 under  Abatement,  Control  and Com-
pliance to  support  Implementation  of the Underground  Injection  Control  program in
57 States and Territories  and  on Indian Lands.  Also in 1982 EPA obligated $21,400
of Abatement,  Control  and  Compliance  funds  for  the  UIC  Implementation  Program.
Those activities have continued under the UIC Grants program element.
                                       ;DW-30

-------
     The major activity  supported by the  grants  was the review  of existing State
laws and  regulations,  modification of these  laws  and regulations  to  conform with
Federal requirements,  development  of  primacy applications  including  conducting
public hearings,  completion  of  remaining  aquifer mapping  and  well  inventories,
assessment of  Class  V  wells, training  of well operators, and  assistance in emer-
gencies.  In  direct  implementation  States,  EPA   funded  support  activities  which
are necessary  to  implement  a  Federal  program,  such as  inventories,  assessments,
training, and public meetings.

JPECIAL SJUDIES AMP DEMONSTRATIONS

1984 Program Request

     No funding is requested  for  1984  because EPA  believes that the National Rural
Water Association  has  demonstrated the  effectiveness of  establishing grass-roots
organizations to provide training  and technical assistance to  small water systems.
EPA has allotted $9.4  million  to  this effort  since 1977  to  improve compliance with
the SDWA  among small  rural  water systems.   The  Agency  believes that  the  State
associations should  be able  to  move  toward   self-sufficiency  through the  use  of
dues and training fees.
     The Agency  is  allocating  through  a Congressional  add-on a total  of SI, 900, 000
under the Abatement,  Control  and Compliance appropriation for this program.  These
funds continue  to  support  the  efforts of  the National  Rural   Water  Association
to improve compliance  with  the SDWA among  small rural  water systems.  The program
is being expanded to  include  two  additional  State  associations,  bringing the total
of States participating to 33.   With this  support,  it Is estimated that approxima-
tely 400  workshops  will  be held  by  the  States  to train  operators  of  the  small
systems in  the  requirements  of  the  SDWA.   Five   States  continue their  training
program specifically  for  Indian lands.   Approximately 15,000  operators  will  bene-
fit from these  courses.   The  State associations are  expected  to provide technical
assistance to an estimated 10,000 cases.

1983 Explanation of Change^Jrom Budget Estimate

     The net increase of +$1,900,000 results from the following action:

     -Congressional  Actl on .  (+$1,900,000)   The Congressional  add-on to this  ac-
tivity of +51,900,000 to  the  Abatement,  Control  and Compliance appropriation  was
for the State rural  water training and technical assistance programs.

1982
     During 1982, the  Agency obligated  a total  of SI, 822, 500  from the Abatement,
Control and Compliance appropriation to  support activities  of the  National  Rural
Water Association.  During this time, the NRWA provided  funds  to  31 State associa-
tions.  With this  support, the States  were required to conduct  at least 12 work-
shops at  which  small   rural  water system  operators  were trained  1n  all  facets of
water system operations,  maintenance,  and  management.   The goal  of this training
program Is to improve  the compliance rate  among these  small rural  systems.   Over
10,000 operators representing over 7,500 water systems received this on-site train-
ing.  The  Association  also  Initiated   similar training  programs  designed  to meet
the needs  of  system  operators on  Indian  lands 1n  five States.  The  NRWA_ also
provided technical assistance in over 8,000 instances.
                                       DW-31

-------
TRAINING

1984 Program Request

     There is  no  request  because EPA  believes  that  there  are  sufficient  oppor-
tunities for State personnel  to obtain further training in environmental  and public
health fields without Federal support.

1983 Prograji

     The Agency 1s  allocating through  a  Congressional add-on a  total  of $159,000
under the Abatement,  Control  and Compliance appropriation.  These  funds  will  con-
tinue to support the  fellowship  program for State agency personnel  in areas relat-
ing to  the  public  water  systems  supervision  and  underground  injection  control
programs.  This assistance will  also provide for academic  grants to universities.

1983Explanation of Changes from Budget Estimate

     The net increase of +$169,000 results from the following action:

     -Congressional  Action.  (+$169,000)   The  Congressional   add-on  to  this  ac-
11 v 1 ty of1+ i 169,000 to ihe 'Abatement, Control and Compliance  appropriation  was for
academic training.

1982Accomplishments

     In 1982, the Agency obligated $191,100 under  the  Abatement, Control and Compli-
ance appropriation.   These funds were used to provide academic training to 73 State
agency personnel  Involved in public water system supervision programs and in ground
water management.
                                       DW-32

-------
                                    DRINKING WATER

                              Drinking Water Management

                                ACTUAL   BUDGET     CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983       1983              1984 VS  1983
                                (DOLLARS IN THOUSANDS)

PROGRAM


Public Water Systems
Supervision Program
Assistance
 Salaries & Expenses           55,353.3   $4,698.2   $5,018.3   $4,992.9     -525.4
 Abatement Control &             5781.3                 $34.3               -$34.3
 Compliance
                       TOTAL   56,134.6   54,698.2   $5,052.6   54,992.9     -559.7

Underground Injection
Control Program
 Salaries A Expenses           $2,776.1   $3,974.4   53,831.6   $4,286.7     $455.1
 Abatement Control 4              542.2
 Compliance
                       TOTAL   $2,818.3   53,974.4   $3,831.6   $4,286.7     $455.1

TOTAL:
 Salaries & Expenses           $8,129.4   $8,672.6   $8,849.9   $9,279.6     $429.7
 Abatement Control &             $823.5                 $34.3               -534.3
 Com pi iance

Drinking Water         TOTAL   $8,952.9   $8,672.6   $8,884.2   $9,279.6     $395.4
Management


PERMANENT WORKYEARS
Public Water Systems              145.1      128.1      128.1      119.1       -9.0
Supervision Program
Assistance               ,

Underground Injection              73.7       82.2       90.6       90.6
Control Program

TOTAL PERMANENT WORKYEARS         218.8      210.3      218.7      209.7       -9.0


TOTAL WORKYEARS
Public Water Systems              158.9      142.5      142.3      132.4      -9.9
Supervision Program
Assistance

Underground Injection              91.8      110.8      118.6      120.8       2.2
Control Program

TOTAL WORKYEARS                   250.7      253.3      260.9      253.2      -7.7
                                      DW-33

-------
                                    DRINKING WATER


                              Drinking  Water Management
 Budget Request
      The  Agency  requests a total  of 59,279,600 and  209.7  permanent workyears  for
 1984  for  Salaries and Expenses.  This  represents  an  increase of $429,700 in  Sala-
 ries  and  Expenses and  decreases of  $34,300  in Abatement,  Control  and  Compliance
 and 9.0 permanent workyears  from 1983.

 Prpgram Descrjjitijifi

      This subactivity,  composed of  two  programs,  includes  EPA Regional  efforts  to
 prevent and  control  the  contamination of drinking water  supplies  and their sources.
 The Public  Water  Systems Supervision  program  (PWS)  relates  to applying  primary
 drinking  water  regulations to  water supplies to assure  safe drinking water.   The
 Underground  Injection  Control  program (UIC) regulates a potential threat to  under-
 ground drinking  water  sources, and also covers two complementary efforts: designa-
 tion  and  scrutiny  of  sole  source  aquifers  and,  in  the  near future,   support  to
 State strategy efforts  to protect ground water  from contamination.

      Both programs involve three general functions.  The first is direct implemen-
 tation of regulatory provisions in  States not delegated  primary enforcement  respon-
 sibility  and on   Indian  lands.  The second  involves  a  cooperative  effort  with
 primacy States  to develop and  maintain programs in  light  of regulatory and  tech-
 nical developments and  to assure  that  the  Federal  mandates are being  fully  Imple-
 mented.   The third function  involves those  responsibilities  intrinsic  to  a Regional
 presence, including  program  management  and support,  close consultation  with  other
 Federally mandated waste management  programs,  and  advisory services  for State  and
 local officials.

      Public  Water Systems Supervision -- This program includes Regional  activities
 related to  imp!ementing  dririicirig"water  regulations.   The Regional   Offices  support
 States  in  administering   PWS   programs  and  implement  programs   in  those   States
 which do  not have primacy and  on  Indian  lands,  where  States do  not have  civil
.jurisdiction.  The Regions assist  States where  specific  problems   are  identified,
 evaluate  State  programs,  and  administer PWS grants,

      Underground  Injection Control  — This  program  includes  Regional   activities
 related to  the  implementation  of the UIC program,  such  as assistance to States  in
 developing  acceptable  programs  and  administering  State-specific  programs as  part
 of EPA's  implementation  responsibility.  The  Regions also review sole source aqui-
 fer designation  petitions and  Federally financed projects  in  the  area  of  designated
 sole  source  aquifers.   Grant  awards  are also  administered by  the  Regions.

 PUBLIC MATER SYSTEMS SUPERVISION PROGRAff ASSISTANCE

 1984  Program Request

      The  Agency  requests 54,992,900  for* Salaries  and Expenses and  119.1 permanent
 workyears.   This   represents  a  decrease of  559,700  and 9.0  permanent  workyears
 from  1983 and reflects a reduced workload  attributable  to the high  rate  of  delega-
 tions and increasing State famil-iarlty  with  and  ability to  implement the  program.
 The high   rate  of program  delegations  in  the  PWS  program  is a direct  result
 of the  Regions'  full and  active participation  with the States 1n developing their
 programs  and the  guidance and  assistance  the  Regions   continue to  provide  after
 States have   received  primary  enforcement  responsibilities,  The  Agency's  grant
                                        DW-34

-------
regulations allow EPA  to  use non-primacy State grant funds  for  direct implementa-
tion activities.  While the Regions continue to encourage the assumption of primacy
by the remaining six States, they will also be responsible for the direct implemen-
tation of  the  Public Water  Systems  Supervision program  in  these  six non-primacy
States/Territories and  on  Indian  lands  and  for  overview  of  primacy  States.

     In non-primacy  States,  monitoring  compliance  with  primary  regulations  among
the community systems  and  working  with small  systems to increase the  rate  of com-
pliance will be  emphasized.   The Regions will  initiate  formal  enforcement actions
against systems with persistent  violations.   The Regions  will  continue to maintain
an inventory of  all  non-community  water systems and to deliver  materials  on  self-
monitoring and  self-compliance  to  ensure  these  systems  are  fully  aware of  the
requirements 1n the drinking water regulations.  In assuring  compliance the Regions
will also  be  responsible for  providing  advice  and  guidance  on  removal  and future
prevention of ground  water contamination  of  public water supplies.   In addition,
the Regions will  follow up  on suspected well  water contamination  and assess the
health risk posed  from  continued use.   In their efforts to  assure  the accuracy of
sampling procedures and  analysis,  the  Regions  will implement a quality assurance
program for State  principal  laboratories and commercial  laboratories  based oil the
satisfactory analysis  of  performance  evaluation  samples.   In  laboratories  where
there is evidence  of  performance evaluation  problems, the Regions will  follow up
with on-site visits.

     To Increase compliance  in primacy  States, the Regions  will encourage States
to develop  enforcement strategies  directed at small  systems,  particularly  those
where health risks  are identified.   They  will  also evaluate  the effectiveness of
the State programs by conducting mid-year  reviews and following  up  with the States
in areas where  specific problems  were detailed.    In  the  grants management  area,
the Regions will  award  grants  to  the  primacy  States,  prepare  guidance  for the
upcoming grant  year,  and  review draft  applications.   Negotiations  will   be held
between'the State and  EPA  on program plans.  They  will  also  Implement a laboratory
certification program  for  State principal laboratories   to   include  analysis  for
all new regulatory requirements.

     In the Regional  management area, the Regions  will  be responsible for planning,
implementing, and evaluating  Regional  program activities,  providing input Into the
development of  National  policies and regulations,  and responding to  Congressional
inquiries and citizen  complaints.  The  Regions  will assess underground and surface
water contamination Incidents which have an impact on public  water supplies, advise
programs on precautions necessary  to  protect  public  health,  and  coordinate activi-
ties with Superfund and  other emergency response  programs at  the  Regional, State,
and local  levels.   They will  work  with the  National  program In  providlng-Jiealth
advice on  the  toxicology of  unregulated  contaminants  Identified  in  public  water
supplies.  The Regions will  also coordinate with other relevant programs to provide
maximum benefits  from  Agency  resources to  protect ground waters  -which  supply
sources for public  water  systems.   They will, for example,  verify  concentration
levels 1n suspected Incidents of contamination and follow up  as required.

1983 Program
  _    ,                                            ^

     In 1983 the  Agency 1s  allocating a  total of  $5,052,600 and  128.1 permanent
workyears, of which  $5,018,300  is  for  'Salaries  and Expenses  and  $34,300 1s for
Abatement, Control, and  Compliance.   Region  VII  will  place  special  emphasis  on
completing the  transfer of   compliance  duties back  to  Iowa,  ensuring  that  no
Interruption 1n  regulatory  coverage occurs.  The  Regions  with  non-primacy States
will  continue to  work  with   them  to  assume  primacy.   One  additional  Terrftory,
Northern Marianas, assumed primacy  on December 4,   1982, bringing the total to 51.

     In the  remaining  six  non-primacy  States  and  on  Indian  Lands,  Regional
activities will  continue to focus  on  assuring  compliance among  small  systems.  The
Regions will emphasize  compliance  efforts in those  systems  which  persistently re-
fuse to monitor  or  that pose  serious  health  threats.   They  will conduct sanitary
surveys, which are the primary means  of  technical  assistance to  systems with  water
quality problems.  When  violations are  detected, the  Regions will  issue  warnings
                                       DW-35

-------
and initiate formal  follow  up.   They will  also  maintain  and analyze data  on  com-
pliance for input into the annual report.  They will assist  community  systems  with
Maximum Contaminant  Level (MCU  violations In  an  effort to help  solve individual
problems.  Guidance and assistance will  be provided as necessary.

     Regional  overview  efforts  In   primacy  States  will   focus on  State  program
accountability to assess the manner  in  which  the program  and management activities
relate to  the  statutory  goals   of  the  Safe  Drinking  Water Act,  to allow  for an
information and feedback  exchange between the Federal  and  State governments which
will provide insight  into the progress  of the programs  as well  as problems, and to
prevent the duplication of efforts at both the State and Federal levels.  They  will
continue grants  administration   activities,  assuring that  the   State  applications
comply with the  pertinent  grant regulations,  conducting audits  and   closing  out
grants when audits  are  complete, and reviewing draft applications  for the upcoming
grant year.  Another  major  activity will  be  conducting  State  evaluations.  These
evaluations provide valuable feedback to  the  States as well as information to the
Regions and to Headquarters  on  the  effectiveness of the  implementation of regula-
tory requirements by  the States.  Following  completion  of  the  State  evaluations,
the Regions will  follow  up to  ensure  areas  with  consistent  problems have  been
acted on.

     Regional  management  activities  include  the  administrative  and  compliance
support needed  in  both  primacy  and  non-primacy States.   The   activities  include
responding to Congressional   inquiries and  citizen  complaints, analyzing compliance
data for  inclusion  into annual   reports,  and  assisting  States  in  their efforts to
plan and implement  programs  which provide increased compliance.   They  will assist
the States in revising  their programs  to include any regulatory updates.   Efforts
will also be made to expand  the coordination of the public water system supervision
program with other  related  programs at  the  Regional  and  State levels  to ensure
adequate protection  of  drinking  water  sources  in  the   event  of  a  contamination
incident.

                                        Estimate
     The net increase of +$354,400 results from the following actions:

     -Congressional Action.  (+$14,000)   This increase  includes  +$14,000  of  the
S10.5 million Salaries and Expenses add-on which supports the 480 additional perma-
nent full-time workyears provided to the Agency.

     -Reprqgrammi ngs .  {+$340, 400)  During  the  development of the  operating  plan,
several reprogrammings were  made to this activity  which are not  reportable  under
the Congressional  reprogramming  limitations.   These  changes resulted  in  a  net
increase of +3306,100 to the Salaries and Expenses appropriation  and a net increase
of +$34,300 to the Abatement, Control  and Compliance appropriation.

1982 Accomplishments

     During 1982,  the Agency  obligated 56,134,600,  of which 55,353,300  was  for
Salaries and  Expenses and  $781,300  was  for  Abatement,  Control  and  Compliance.
These funds  supported  Regional  programs  in  implementing the Public  Water  Systems
Supervision program in  non-primacy States,  overview of primacy State  activities,
and program  management  to  ensure efficient  operation  of the programs.  One  addi-
tional  State,  Iowa,  which relinquished primacy  in  late 1981 primarily  because  of
budget constraints, reassumed primacy,  bringing  the total  to 50.   The  Region also
worked closely with  the Northern  Mariana Islands  to  promote their  assumption  of
primary enforcement responsibility,

     In non-primacy States,  the Regions  focused  On improving the  compliance  rate
by issuing  formal  warnings  for violations, issuing  variances  or  exemptions  with
compliance schedules to  those  systems which  could  not comply with the  regulatory
                                        DW-36

-------
requirements, and  initiating  formal follow-up  1n community  systems  which  failed
to meet  regulatory  requirements.   The  Regions  also  continued  to   expand  their
laboratory certification  program to  include  analysis  required  by   the  recently
promulgated trihalomethane  regulations.   The  Regions  continued  to   maintain  the
inventory data and to prepare the annual  report.  The Regions assisted in emergency
situations and also  followed  up  on instances of  ground water  contamination which
had the potential  to  contaminate public  water systems'  source  waters  by providing
analytical services to  quantify  the extent  of  the  problem and  advice  on  contain-
ment, treatment, and other potential responses.

     Regional activities in primacy States focused on overview of the State activi-
ties, including a mid-year evaluation of the Individual programs which served as an
indicator of the overall effectiveness of the public  water system supervision pro-
gram.  They  also  maintained  and analyzed  compliance data to assure  that  the high
level of compliance was continued and provided guidance and assistance in instances
where compliance was  not easily  attained,  A series  of seminars which demonstrated
techniques to be applied  in  verifying  compliance data was held  in  all ten Regions
and attended by over 40 States.  Another high priority Regional  activity associated
with primacy States has been the administration  of the grants program.  The Regions
performed program  planning,   provided  input into  national  program policies,  and
coordinated policies  and  activities  with   other related  programs   to  establish
consistent procedures for protecting drinking water.

1JNDERGROUHD INJECTION CONTROL PROGRAM

1984 Program Request

     The Agency  requests  54,286,700 in  Salaries and  Expenses  and 90.6 permanent
workyears, an  increase  of  5455,100 over  1983.  The  increase  is  attributable  to
increased workyear costs primarily due to Commissioned Corps benefits and Medicare.

     It 1s estimated that  an  additional  12 States will  receive  full  primacy for a
total of  39.   The Regions  will  continue  to work with the  remaining no"-pr1macy
States in an effort  to  achieve complete delegation  of  the program.  In these non-
primacy States and Territories and  on Indian Lands,  the Regions will  continue  to
maintain the inventories  of  injection  wells,  will  perform  technical  evaluations
of permit applications  for  new Class  I,  II,  and III  wells, and  will review testing
data and  operator  reports to ensure compliance with the  regulations.  Compliance
data will  be  compiled  into  State  annual reports  and transmitted  to  Headquarters
for review to determine the effectiveness of the  program requirements  and  the need
for regulatory change.

     The Regions will  conduct on-s1te  inspections on  the  construction' and testing
of injection wells and  will  continue  the  assessment  of  Class V (miscellaneous
injection) wells to determine their number  and  contamination potential.  Following
this review, and  similar  assessments  by the primacy  States, the Agency will  con-
sider whether Class  V wells  need to be regulated by  rule or other means as appro-
priate.  EPA will  also provide  technical  review  and  evaluate  permit applications
for new and existing wells as well  as follow up on compliance through phone calls,
letters, and  visits.   Similar  activities   will  be   conducted   on Indian  Lands.

     Regional support to primacy States  will Include  guidance  and  advice  relating
to regulatory  and  technical   Issues and  response to  State inquiries.   As  part  of
the grants  management  function,  they  will  assure  that  the  States  comply  with
applicable grant regulations, track  grant expenditures  and  withdrawals, conduct a
review of the  State  financial status report, and audit and  close  out grants.   In
their efforts  to  determine the  effectiveness of  the UIC  regulatory  requirements,
the Regions will collect and  analyze State  annual  report data as well  as conduct a
mid-year evaluation of State programs.
                                        DW-37

-------
     Continuing with their  efforts to prevent  the  contamination of  aquifers,  the
Regions will  review and  process  petitions  for  the  designation  of  sole  source
aquifers and,  when resources  are  available,  review  proposed Federally  financed
projects in the area of  a designated aquifer to assure  that  they will  not present
any contamination potential.

     The Regions will  assist States in assessing their own  ground  water protection
needs and developing and  implementing  State ground water strategies.   When appro-
priate, the  Regions will  facilitate discussions  between States to  promote inter-
state coordination.  With the expertise available in the  Regions, they will provide
ground water management  advice to the States  and  other  Federal  agencies  on  such
issues as tracking plumes of contaminated  ground  water to prevent  contamination of
major drinking water sources.   The Regions will  also play a major role in coordinat-
ing EPA's program efforts for protection  of ground water.

1983 Program

     In 1983 the  Agency  is  allocating a  total  of  $3,831,600 under  Salaries  and
Expenses and 90.6 permanent workyears for this  program.

     The Regions are making  a  concerted  effort to  accelerate delegation of the UIC
program.  It is anticipated that  an additional  23  States  will  achieve full primacy
for a total  of 27.  Two additional  States will receive  delegations  for  their  oil
and gas  programs  only,  and  one  additional State  will  receive delegation  for  the
non-oil  and  gas  programs.   The Regions  will  continue to review program  plans  and
legislative authority  and will also  provide  grants which will  enable these States
to initiate the beginning phases  of their  programs,  such  as permitting and compli-
ance follow  up.    The  Regions  also provide  assistance   in emergency  situations.

     In non-primacy States, the  Regions  continue  to develop and begin to implement
the Federal program.  This includes developing  regulations for each State,  proposing
the program  in the Federal Register,  conducting  public  hearings,   reviewing  data
and establishing a system  for data collection,  and  beginning the  assessment  of
Class V wells.

     The Regions continue their review and processing of  sole source aquifer desig-
nation petitions.   It  is  anticipated  that  seven  additional petitions  will   be
approved during 1983,  bringing  the total  to 17.  They are  responsible for review-
ing any proposed Federally financed project  in  the  area  of a designated aquifer to
determine if there is  any contamination potential.

     The Regions continue to work  with the States  in developing their ground water
protection activities.   Emphasis  is  placed on assisting  States in  determining  the
extent of their  ground  water  problems and making  full  use of existing  State  and
Federal  programs to address them.  The  Regions provide   advice on  such  issues as
plume tracking  and assist  Headquarters  In developing   the  Agency's  approach  to
ground water protection.   The Regions continue  to expand  their  efforts  to coordinate
the ground  water  program  with other  related programs to enhance their ability to
better respond to contamination of ground water supplies.

     Other activities  include  basic program  management activities  such as Congres-
sional  response,  data   management,  program  planning,  and  information  requests.

1983 Explanation of Changes from Budget Esti mate

     The net decrease  of -$142,800 results from the following actions:

     -Conaresslpnal Action.   {+$191,100)   This  Increase  includes +5191,100  of the
S10.5 miTTIon Salaries;  andExpenses add-on which supports the 480 additional perma-
nent full-time workyears provided to the Agency.
                                        DW-38

-------
     -Reprogrammings.  (-5333,900)  During  the  development of the  operating  plan,
several reprbgrammings were  made to this activity  which  are not  reportable  under
the Congressional   reprogramming   limitations.   These  changes resulted  in  a  net
decrease of -$333,900 to the Salaries and Expenses appropriation.

1982 Accomplishments

     During 1982,  the  Regions obligated  $2,818,300,  of  which  $2,776,100 was  for
Salaries and  Expenses and  $42,200  was  for Abatement,   Control  and  Compliance.
Regional efforts  focused on   promoting  delegation  of the  Underground  Injection
Control (UIC)  program to the States.  The Regions worked closely  with the States in
developing their primacy applications  by  reviewing existing programs, legislation,
regulations, and draft applications.   The  Regions conducted  the  initial  review of
the final   applications  and  then forwarded  them for  Headquarters  review and  the
Administrator's approval.  By the end of 1982, four States had assumed full  primary
enforcement responsibility  for  all  aspects of  the  UIC  program;  two States  were
granted program delegation for the oil  and gas program only; and  one State received
delegation for Its non-oil  and gas program.  The Regions also awarded and monitored
underground injection control  grants  and provided  assistance in  emergency  situa-
tions.

     For States that Indicated their unwillingness  or inability  to assume primacy,
the Regions began  establishing  the institutional  framework  and Information  base
needed to  implement  the  program.   Such  activities  included  completing  aquifer
mapping, developing  an   Inventory of  injection  wells,  developing  State-specific
program plans, and establishing an emergency response capability.

    The Regions conducted  technical  reviews of sole  source aquifer  designation
petitions.  By  the  end  of  1982, a  total   of  10 aquifers  had  been  designated as
sole or principal   sources  of drinking  water,  of which two were  approved  in  1982.
The Regions also  reviewed Federally  financed  projects in the  area  of  designated
aquifers to assure the prevention of possible contamination.

    The Regions coordinated their ground  water  activities under  the Drinking  Water
program with other  related  programs  such  as Hazardous Waste,  Superfund,  and Toxics
in an  effort to better  utilize the  Agency's resources and to provide the necessary
expertise when contamination  incidents  occur.   They  also  conducted general  program
management activities  such  as program  planning, response  to Congress  and  public
inquiries, and input into National policy development.
                                        DW-39

-------
Page Intentionally Blank

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                               1984 Budget Estimate
                                Table of Contents
DRINKING HATER
    ENFORCEMENT
          Drinking Mater Enforcement	  DW-41
                                       DW-40

-------
      DRINKING WATER

Drinking Water Enforcement

  ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +•
   1982    ESTIMATE   ESTIMATE    1984    DECREASE -
             1983       1983             1984 VS 1983

PROGRAM
Drinking Water
Enforcement
Salaries & Expenses
TOTAL
TOTAL:
Salaries & Expenses
Drinking Water TOTAL
Enforcement
PERMANENT WORKYEARS
Drinking Water
Enforcement
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Drinking Water
Enforcement
TOTAL WORKYEARS '
(DOLLARS IN THOUSANDS)

$685.4 $8.56.1 $882.1 $1,114.3 S232.2
$685.4 S856.1 $882.1 $1,114.3 5232.2
$685.4 $856.1 $882.1 $1,114.3 $232.2
$685,4 $856.1 $882.1 $1,114.3 5232. Z

20.3 25.7 25.7 29.7 4.0
20.3 25.7 25.7 29.7 4.0

21.2 25.7 25.7 29.7 4.0
21.2 25.7 25.7 29.7 4.0
        DH-41

-------
                                   DRINKING WATER


                             Drinking Water Enforcement
Budget Request
     The Agency requests  a total  of  $1,114,300 and  29.7  permanent workyears  for
1984, an increase of $232,200  and  4.0  workyears from 1983.  All of this  amount  is
for Salaries  and  Expenses.  This  program element includes  both Headquarters  and
Regional resources.

Program Description

     The Safe Drinking Water Act provides for State assumption of the drinking water
program and requires  EPA to implement  the program  in  States  that  have not  been
delegated enforcement responsibility.  The Act  includes  significant  self-reporting
mechanisms as its  major enforcement activity.  EPA Regions must fulfill  the enforce-
ment responsibilities for  non-primacy  jurisdictions, which  relate  to  the  program
support to legal  actions against violators  of  statutory  provisions.   These  Include
the following:  developing  technical  documentation  for  cases referred  for prose-
cution, collecting supplementary field  data  through   site  Inspections  and sampling
to support  enforcement actions;  providing for expert testimony; and  participating
in negotiations with  violators.  The  Public  Water  Systems  Supervision  (PWS)  en-
forcement responsibility  also  entails developing  critical  data  relating  to taking
emergency action  1n  the  face of Imminent health endangerments  under  Section  1431.

     The Underground Injection  Control  regulations provide that EPA  delegate  pro-
grams to States that  are able  and willing  to  assume primacy for the  UIC program.
The Agency projects  that  39 States will  be  delegated primacy by the  end of  1984.
Enforcement program  activities Include  approving  of the  enforcement sections  of
primacy applications  for State  UIC  programs,  issuing UIC permits in non-primacy
States, working with the UIC drinking  water program  in establishing  a Federal  UIC
program in non-primacy States, Initiating enf6rcement action against  violators  of
the regulations,  and responding to  emergencies  when necessary.

DRINKING WATER ENFORCEMENT   .

1984 Program Request

     The Agency requests  a total  of  $1,114,300 and  29.7  permanent workyears  for
this program,  all of  which will  be  for  the  Salaries and Expenses  appropriation.
This Is an increase of $232,200 and 4.0  permanent  workyears  from 1983 and reflects
the need for  EPA  to Issue UIC  permits In  non-primacy States  and Territories and  on
Indian lands.  Technical  assistance  and  support will be provided to  the  Office  of
Legal and Enforcement  Counsel  1n the development  of warranted civil  and  criminal
referrals for PWS and UIC activities.

     During 1984,  the  drinking water enforcement  program  will  continue  to supply
the technical   program  support to  legal  actions  taken  against violators  of  PWS
and UIC provisions 1n jurisdictions  where States have not assumed  primacy enforce-
ment responsibility.  This will Include  developing technical   Information  for  cases
referred to EPA's Office of Enforcement Counsel and ultimately to  the Department
of Justice,  collecting  supplementary  field  data  for  active  cases,  providing  for
expert testimony,  and participating in negotiations  with violators.   EPA will  also
provide such  services  for cases referred by State  authorities 1f they  choose  to
pursue violations  under Federal law.
                                       DW-42

-------
     Regional enforcement programs  will  perform the administrative  aspects  of UIC
permitting in non-primacy jurisdictions.  This entails the distribution and receipt
of permit  aplications,  the  administrative  review  of  the proposal  for permitting
(including close  consultation with  the  Regional  technical  experts for  inputs to
permit provisions),  conduct  of a  formal  hearing,  and issuance  of  a final  permit.
The enforcement program  will  also participate in  the  review of  the remaining DIG
primacy applications.

1983Program

     In 1983, the  Agency is  allocating  $882,100 and  25.7 permanent workyears for
this program, all  of which  is for the Salaries  and Expenses appropriation.   A PWS
compliance assurance  program will  continue  to  be implemented  in  six non-primacy
States and  Territories   and  on  Indian  lands.   A   Federal  enforcement program is
being developed and  implemented  in  those  States that  choose not to  implement their
own UIC  program.   EPA  will   issue UIC  permits in these  18 non-primacy  States.
Draft and  final  State  UIC  program  approval  applications will  be  reviewed.   All
resources associated with case development and legal activities have been transfer-
red to the Office of Legal and Enforcement Counsel.

1983 Explanation of Changes from Budget Estimate

     The net Increase of +$Z6,OOQ results from the  following actions:

     -Congressional Action.   (+52,000)   This  increase  includes  +$2,000  of  the
S10.5 mil 11 on Salaries and Expenses add-on which supports the 480 additional  perma-
nent full-time workyears provided to the Agency.

     -Reprogramtirlngs.  (+524,000)   During  the development  of the  operating  plan,
several reprogrammings were  made to this activity which are  not reportable under
the Congressional   reprogramming  limitations.   These  changes  resulted  in  a  net
increase of +524,000 to the Salaries and Expenses appropriation.

1982 Accompl i shments

     In 1982, the  Agency obligated  $685,400 for  this program,  all of  which was
for the Salaries  and Expenses appropriation.  During  1982,  EPA  referred nine civil
actions for violations of the Safe  Drinking  Water Act to the Department of Justice
for filing and prosecution.

     Drinking water  enforcement  activities  also  included participation in develop-
ment activities  for  the  Federal  UIC  program and  review of  draft and  final  UIC
State program approval applications from 24 States.
                                       DW-43

-------
Hazardous Waste
      SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
                                                                            Page.

HAZARDOUS WASTE                                                             HW-1

    RESEARCH & DEVELOPMENT
       Hazardous Waste Research	  HW-3
    ABATEMENT & CONTROL
       Waste Management Regulations, Guidelines and Policies.."...	  HW-23
       Financial  Assistance	  HW-27
          Hazardous Waste Management Financial  Assistance to States.......  HW-28
          Resource Recovery Local  Financial  Assistance	  HW-30
       Waste Management Strategies Implementation,	  HW-31
          Hazardous Waste Management Regulatory Strategies Implementation.  HW-33
          Solid Waste Management Program Implementation	  HW-35
       Technical  Assistance.	  HW-36
          Technical Information Development....	  HW-37
          Solid Waste Technology Assistance  Delivery	  HW-37
       Uncontrolled Hazardous Waste Sites	  HW-39
    ENFORCEMENT
       Hazardous Waste' Enforcement	."	  HW-42
          Hazardous Waste Permit Issuance..	  HW-43
          Hazardous Waste Enforcement...	  HW-44
                                       HW-1

-------
                                   HAZARDOUS  WASTE

                                ACTUAL   BUDGET     CURRENT
                                 1982    ESTIMATE    ESTIMATE
                                           1983       1983
                                 ESTIMATE   INCREASE  +
                                   1984    DECREASE  -
                                          1984 VS  1983
APPROPRIATION
                                (DOLLARS IN THOUSANDS)
 Salaries & Expenses
 Abatement Control  &
 Corap! i ance
 Research & Development

TOTAL, Hazardous Waste
 327,188.6  $31,700.4  $32,826.3  S35,038.6   52,212.3
 $61,426.1  $53,926.1  563,028.0  $58,150.4  -$4,877.6

 521,963.7  517,717.2  $20,697.2  $16,923.7  -53,773.5

$110,578.4 $103,343.7 5116^551.5 $110,112,7  -$6,438.8
PERMANENT UORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
     586.1      557.0      643.1      625.8      -17.3
     737.9      740.1      821.9      830.0        8.1
$123,514.05124,857.6 5115,722.05114,192.0  -51,530.0
5120,000.0
                                       HW-2

-------
                                  HAZARDOUS WASTE


OVERVIEW AND STRATEGY                      i

     Hazardous wastes,  including  organic  chemicals,  pesticides, acids,  caustics,
flamnables, and  explosives,  are  generated 1n  the United  States at  the rate  of
nearly 50  million  metric  tons  each  year.  They  are the  subject  of  substantial
environmental concern  by  government,  industry,  and  the public.  Improper  manage-
ment of these  wastes  can cause  a variety  of  health  and  environmental  damages,
the most frequent  being  ground  water and  surface water  contamination,  poisoning
through the  food  chain  and  direct  skin  contact,   fire,   and  explosions.   Such
damages and subsequent  remedial, actions  could  eventually  cost hundreds of millions
of dollars.

     The major  goal  of the hazardous  waste program  is to reduce future  risks  to
public health  and  the  environment  by  ensuring  environmentally-sound  management
of the  ever  growing  amount  of   hazardous  wastes.   The  regulatory  development
and program  implementation components  of the  EPA hazardous  waste  program,  sup-
ported by  the  research  and  development  and  enforcement  functions,  constitute
a comprehensive program to facilitate proper nationwide  attention to  this environ-
mental problem.

Abatement and Control
     Subtitle C of  the Resource Conservation  and  Recovery Act of  1976  (RCRA),  as
amended, provides the  legislative  mandate for  Federal   development  of  effective
national programs  for   regulation  of  hazardous wastes   from  generation,  through
transportation, storage,  or  treatment, to  disposal.   RCRA  also imposes  signifi-
cant civil  and criminal penalties for  failure  to comply  with Federal  requirements.
Through regulatory  development,  Implementation,   enforcement,  and  research  and
development activities, the  Agency translates  Federal   concern  for  this  environ-
mental problem into  a  comprehensive national  hazardous   waste  management  program.

     The Agency's strategy for  its  hazardous  waste regulatory program is to imple-
ment the existing program  through  the  States and  Regions;  review  and reassess the
current hazardous  waste  regulations  to  enhance   their  cost-effectiveness;  and
conclude an even,  comprehensive hazardous  waste  program by developing  standards
for selected  wastes  which remain outside  of, or  are inappropriately covered  by,
the existing RCRA Subtitle C regulations.

     The Agency promulgated  the core  RCRA regulations   between  May 1980  and July
1982.  The  regulations establish  lists  and  characteristics   of  hazardous  waste
(§3001); generator  and  transporter  requirements   (§§3002  and  3003);   financial
responsibility, interim  status   and  technical  permitting  standards  for  new  and
existing storag,e, treatment,  and  disposal  facilities   (§3004);  and  requirements
for State programs and permits (§§3005 and 3006).

     With promulgation  of the  core  RCRA  regulations  complete, implementation  of
RCRA can be undertaken in earnest at both  the  Federal and State  level,   fine of the
Agency's highest RCRA  program priorities  in 1983  and 1984  is  the  authorization  of
States to operate'their own hazardous waste programs in  11eu of the Federal regula-
tory program*  State  programs^are  authorized  in   phases:  Phase  I  - manifest  and
interim status  standards;  Phase  IIA  -  permitting tanks,  containers,   and piles;
Phase IIB  -  permitting  incinerators;  and  Phase  1IC -  permitting  land  disposal
facilities and  surface  impoundments.    The  Agency  has  already  granted  Interim
Authorization to  35 States  and Territories  whose programs provide  substantially
equivalent coverage to that of the RCRA regulations.
                                       HW-3

-------
     State oroqrams become  eligible for  Full  Authorization  in  January 1983.   In
accordance with  RCRA  requirements, Interim  Authorization  will  expire  in  January
1985.  States  with  Interim Authorization will  need to receive  Full  Authorization
by that date or the hazardous waste program will revert to  the Agency.  The Agency,
therefore, emphasizes  assistance  to States  in  upgrading  program caoabilities  to
equivalence, guidance on  development  of  applications  for  Full  Authorization,  and
approval of State  applications as  rapidly as possible.  By the end of 1984, almost
all States  are expected  to either  be  Fully   Authorized  or  have an  application
under Agency review.

     In addition to program development guidance, the  Agency  will  continue to pro-
vide financial  assistance to States to  encourage them  to work toward  authorization
and to  begin  Implementing their  own  hazardous  waste  program, as RCRA envisions.
To the  extent  that States  are  not Interim  or  Fully  Authorized,  the  Agency  must
administer the RCRA  program.   However, since  Agency policy  encourages  State par*
tidpation even  prior  to authorization,  Cooperative Arrangements allow  States  to
operate parts  of the RCRA program  on behalf  of the Agency  and to receive financial
assistance.

     The issuance  of  environmentally-sound  permits  is another  RCRA  implementa-
tion priority.   The ultimate  implementation  of RCRA rests on  national  progress  in
permitting treatment,  storage,  and disposal  facilities.   In  1982, the  Agency,  in
cooperation with Interim Authorized States, began permitting facilities  for storage
and treatment  of hazardous wastes in  tanks,  containers,   and piles.   The Agency
and States  are giving  priority  to  permitting  both   incinerators  and  land  disposal
facilities beginning in  1983 and  continuing  until  these  types  of   facilities  of
greater environmental   concern  are permitted.   The Agency  will  also   initiate  a
class permit approach  for  storage and  treatment   facilities  designed to  reduce
application requirements and  permit Issuance time  for many  storage  and treatment
facilities.

     As oart of its regulatory reform  effort, the Agency is reviewing and reassess-
ing the core  RCRA §3004 technical  standards  for landfills,  surface  impoundments,
land treatment facilities,  incinerators,  tanks, containers,  and  waste piles,  as
well as the  facility  location and  financial responsibility  requirements.   Regula-
tory impact analyses  of  these regulations,  which will be completed in 1983,  are
intended to identify potential  areas   for increased program  effectiveness  and  for
more cost-effective achievement  of environmental results.

     The Agency has also embarked  on an intensive effort to finalize the hazardous
waste regulatory program.  Gaps exist  in  the coverage  of  the RCRA hazardous  waste
program.  Listings and deli stings  of  additional hazardous wastes  under RCRA  §3001
and RCRA §3004 management  standards for  certain wastes will, by  1985, reduce  in-
stances of  over  and  underregulation of Industries  or  wastestreams.   Earmarked  for
regulatory attention during 1983  and 1984 are additional   organic  chemical  wastes,
waste oil,  boilers  burning  hazardous   waste,  restricting   certain  wastes from land
disposal,  and  air emissions from hazardous waste facilities.   The Agency will also
re-examine two specific provisions  in  the regulations:  the  small  quantity genera-
tor exclusion  and  the  requirements for the reuse,  recycling, and  reclamation  of
hazardous  waste.    In  the  regulatory   analyses  process, the  Agency  will   apply  a
degree-of-hazard approach to  evaluate  .waste  management standards based  upon  the
inherent characteristics  of the  waste,  the  management  technique  being   used  to
handle the waste, and the environmental setting.

Enforcement

     The Agency's  strategy  for  implementing the national  hazardous  waste  compli-
ance monitoring and enforcement program establishes a balance between the promotion
of voluntary compliance  with and  the  discovery and remedy  of violations  of RCRA
regulatory and  statutory  requirements.   Compliance  monitoring   Inspections  will
concentrate on those major  handlers (treatment, storage,  and disposal  facilities;
generators; and  transporters)  whose   operations  pose  the  greatest  concern  to
public health and the environment.
                                       HW-4

-------
     In 1984,  ground  water  monitoring facilities,  Incinerators,  facilities  per-
mitted in  1983  and certain  generators will  receive  inspection  priority based  on
such criteria  as  compliance  history  and  type  of  waste  handled.   Enforcement
actions such  as  informal  letters  of  warning;  RCRA  §3008  Compliance Orders;  RCRA
§3013 monitoring,  testing,   and  analysis  Administrative  Orders;  and  RCRA  §7003
imminent hazard  Administrative  Orders  will  be issued  where  appropriate to  bring
violators back  into  compliance  with  the  regulatory  and  statutory  requirements.
RCRA technical enforcement activities  complement  Agency legal  activities in devel-
oping Federal judicial  actions for major  violations of  Subtitle C  requirements.

     To ensure national consistency  and equivalence of RCRA statutory  and  regula-
tory requirements, the  Agency will  review  and evaluate  States' compliance  moni-
toring and  enforcement  programs.   Joint  oversight inspections  will  be  conducted
to evaluate  State personnel   and  capabilities  in authorized  and  Cooperative  Ar-
rangement States.   In   addition,  technical   assistance  such  as  expert  witnesses
and laboratory testing  and  analysis  will  be provided  to  States to  support  their
enforcement actions.

Research and Development

     The 1984 Research  and Development orogram  will  support  the hazardous  waste
regulatory program by  developing the  scientific  and  technical  data required  for
Issuing facility  permits  and  confirming the  validity  of the  regulations.   Re-
search results will also form part of  the basis  for revising  the RCRA regulations,
where aporopriate, by  justifying  their being made  either  more or less  stringent,
depending on the degree of hazard associated with  specific pollutants under speci-
fic conditions.   Environmental  engineering  activities  will  focus  on providing  a
sound underpinning for  existing  regulations  through  such efforts as  determining
the reliability  of both  synthetic and  natural  landfill  liners.   Monitoring  and
quality assurance protocols and guidelines are  being developed to  detect,  Identify
and measure  hazardous  wastes for  purposes  of  ensuring that permitted  facilities
are complying with regulation  requirements  and detecting  the presence  of specific
wastes 1n  the  environment.    Health,  scientific  assessments  and   environmental
processes research are all   focused   on  determining  the  risks  associated  with
specific hazardous wastes for  purposes of  listing and deli sting wastes  as  hazard-
ous and modifying the regulations.
                                       HU-5

-------
                                  HAZARDOUS WASTE
Program Activities

RCRA Standards
Proposals and
  Promul gations....

Suoplemental Rules
and Technical
Amendments to
Phase I and II
Promul nations.......
Section 3001
Delistings....
Regulatory Impact
Analyses Produced...

Program Implemen-
tation Guidances....

States with Hazardous
Waste Grant/Coopera-
tive Arrangements...

States with
Authorization:
    Phase I only
    Phase I and II
    Final	
EPA Facility Comoli-
ance Monitorinq
Inspections..	
Nati onwi de Faci11ty
Permitting:
    Call-ins,	
    Permits in
      Process.......
    Permit Actions..
 Actual
  1982
   30
  150
   12
   53
   29
    5
1,650
  926

  972
    4
 Budget
Estimate
  1983
    56
    28
    11
 2,950
Current
Estimate
  1983
                          .11
   53
   15
   31
    1
 1,020*
  325

  550
  750
Estimate
  1984
                           15
   53
    7
   25
   18
  688*      1,085
  325

  500
  575
 Increase*
 Decrease-
1984 vs. 1983
                           •f  4
25
140
5
25
.27
150
5
20
17
150
5
25
- 10
0
0
•f 5
    -  6
    •f 17
               +397
    -150
    -175
Footnotes
     * - States will conduct an additional 12,000 inspections.
    ** - EPA permit actions only.
                                       HW-6

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                               1984 Budget Estimate
                                Table of Contents
HAZARDOUS WASTE
    RESEARCH * DEVELOPMENT
       Hazardous Waste Research.	  HW-8
                                      HW-7

-------
                                   HAZARDOUS WASTE

                               Hazardous Waste Research

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS  1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Scientific Assessment
Salaries & Expenses
Research & Development
TOTAL
Technical Information &
Liaison
Salaries S Expenses
Research & Development
TOTAL
Monitoring Systems &
Quality Assurance
Salaries S Expenses
Research & Development
TOTAL
Health Effects
Salaries & Expenses
Research 4 Development
TOTAL
Environmental Engineering
& Technology
Salaries & Expenses
Research & Development
tOTAL
Environmental Processes
& Effects
Salaries & Expenses
Research 4 Development
TOTAL
TOTAL:
Salaries 4 Expenses
Research & Development


$2
$4
$6
$1
$1
$489.
$225.
$715.
$177.
$1.
$178.
,408.
,326.
,734.
$57.
,275.
,332.
$2,486.
$14,444.
$16,930.
$1
$1
$3
$7
$21
,664.
,691.
,355.
,283.
,963.
9
3
2
2
7
9
2
1
3
3
1
4
2
3
5
4
2
6
2
7
$1

$3
S3
$7
$1
$938
$304
,243
$182
$90
$272
,521
,662
,183
$376
$691
,068
$4,524
SI 0,408
$14,933
$2
$2
$4
$11
$17
.318
,559
,878
,862
,717
.8
.9
.7
.4
.0
.4
.2
.1
.3
.5
.9
.4
.9
.4
.3
.2
.9
.1
.0
.2
$938.8
5604. 9
$1,543.7

$3,620.9
$3,662.1
$7,283,0
$376.5
$691.9
$1,068.4
$4,900.2
$13,178.4
$18,078.6
$2,417.9
$2,559.9
$4,977.8
$12,254.3
$20,697.2
$960
$550
$1,511

$2,986
$4,029
$7,016
$381
$586
$968
$3,684
$9,567
$13,251
$2,452
$2,188
$4,641
$10,465
$16,923
.9
.9
.8

.5
.9
.4
.2
.9
.1
.7
.1
.8
.3
.9
.2
.6
.7
$22.
-$54.
-$31.

-S634.
S367.
-$266.
$4.
-$105.
-$100.
-$1,215.
-$3,611.
-$4,826.
$34.
-$371.
-$336.
-$1,788.
-$3,773.
1
0
9

4
8
6
7
0
3
5
3
8
4
0
6
7
5
Hazardous Waste
Research
TOTAL  $29,246.9  $29,579.2  $32,951.5  $27,389.3  -$5,562.2
                                       HW-8

-------
                                   HAZARDOUS  WASTE
                               Hazardous  Waste  Research
                                ACTUAL    BUDGET     CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983       1983              1984  VS  1983

PERMANENT WORK YEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems 4
Quality Assurance
Health Effects
Environmental Engineering
4 Technology
Environmental Processes
& Effects
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems 4
Qual ity Assurance
Health Effects
Envi ronmental Engi neeri ng
(DOLLARS II
V,
10.1
2.6
21.5
1.7
41.4
28.5
105.8

15.8
4.5
30.3
1.7
57.6
1 THOUSANDS

14.5
2.1
22.0
4.0
59.0
28.4
130.0

21.0
3.7
32.0
4.0
79.9
)

14.1 14.1

25.0 25.0
4.0 4.0
70.3 60.0 -10.3
30.8 30.8
144.2 133.9 -10.3

20.1 20.6 .5

34.0 35.0 1.0
4.0 4.0
90.6 77.0 -13.6
& Technology
Environmental Processes
& Effects
TOTAL WORKYEARS
 38.3       48.1       50.5       50.5
148.2,      188.7      199.2      187.1     -12.1
                                       HW-9

-------
                                 HAZARDOUS WASTE
                             Hazardous Waste Research
                                             Actual
Major Outputs/Milestones                      J.982^

Develop Techniques and Procedures to
Characterize Wastes for Listing and
Other RCRA Regulatory Activities

-  Hazard profiles for unusual  chemicals        9/82
   (Scientific Assessment)

-  Improvement and standardization of          Ongoing
   detection limits of analytical methods
   (Monitoring)

Develop Technical Data Necessary to support
RCRA Treatment, Storage and Disposal Regula-
tions                              /

-  Development of methods for assessing         9/82
   health effects and exposures to complex
   hazardous waste (Scientific Assessment)

-  Development of a containment/soil            9/84
   interaction protocol (Engineering)

-  Development of liner specifications          4/83
   and testing of systems (Engineering)

-  Development of a model for movement of       6/83
   hazardous wastes 1n the subsurface
   (Env. Processes)

Develop Technical Data and Methods
Necessary to Support RCRA Permitting
and Enforcement Activities

-  Development of field screening method-       9/84
   ologies for quick qualitative analyses
   (Monitoring)

-  Development of data on thermal decomposi-    9/83
   tion of hazardous compounds (Engineering)

-  Development of a hydrogeological protocol    8/83
   for determining the suitability of a
   site for land disposal {Env. Processes)

Develop Techniques and Procedures to
prevent and Contain Hazardous spills

-  Development of prevention, compliance and    9/82
   response studies (all programs)

Provide Quality Assurance to the
Hazardous Waste Program

-  Development of standard reference          Ongoing
   materials for complex matrices, and
   performance evaluations of contractors
   (Monitoring)
Current
Estimate
 1983  -
   9/83


  Ongoing
Estimated
  1984
   9/84


  Ongoing
   9/83



    9/84


   7/83


   6/83
   9/84



   9/84


   9/86
    9/84



   9/83


   8/83
   9/84
   9/86
   9/83
 Ongoing
    9/84
  Ongoing
                                       HW-10

-------
                                  HAZARDOUS WASTE


                              Hazardous Waste Research


BUDGET REQUEST

     The Agency  requests  a  total  of $27,389,300 and .133.9  permanent  workyears for
198*, a decrease  of 55,562,200 and  10,3  permanent workyears  from  1983.   Included
in this total 1s 510,465,600 for Salaries and Expenses and $16,923,700 for Research
and Development,  with  decreases of  $1,788,700  and $3,773,500  respectively.   This
decrease primarily  occurs in the environmental   engineering  and technology program
element.  In addition, the decrease reflects the transfer of $2,403,700 in explora-
tory research funds to the Intermedia program..

PROGRAMDESCRIPTION

     The Resource  Conservation and  Recovery Act  {RCRA)  authorizes  a  regulatory
program to  identify those  wastes  which  pose  substantial  hazard  to human  health
and the environment,  and to establish  management  standards  sufficient  to prevent
such harm.   Research   in  this  program  provides  the  scientific  and  engineering
basis for  characterizing  and   determining  the   extent  of  problems   and  "for  for-
mulating controls.  The  Clean  Water Act  of 1977  and  its amendments also mandate
some of the  research  conducted in this  program, specifically, the spills related
efforts.  The following objectives  support these missions.

     Objective 1.  Develop  Techniques  and Procedures  to  Characterize Wastes for
Listing" ami Other ;RCRARegulatory Activities.  Section3001  of KCRA  remnres  that
the Agency  designate  hazardous wastes  in3  the  characteristics  of  waste  which
cause them to be hazardous.   The objective  in  this  area is  to develop  analytical
procedures and technigues  required  to  characterize a waste  and assess  the hazards
DOSed from  their exposure  1n   support  of defensible listing/dellstina  decisions.

     Objective 2.  Develop  Technical  Data  flecesMry to jSupport  RCRA  Treatment,
Storagejano* PisWsaTRegu 1 affons~   Section  3004 of  RCRA r eQuire-s the"" Agency'  to
Dromurgate regulations  an3  establish  performance  standards   for  the  treatment,
storage and disposal of hazardous waste as may be necessary to protect human health
and the environment.   The purpose  of  this  program  is  to develop the  engineering
and technical data necessary to support the  Agency in  the development a^d  revision
of hazardous waste regulations.

     nb.iectiye 3.  Develop Technical   Data and Methods Necessary  to   Support  RCRA
PermilHng aMTnfoiremenr Activities.  ' SectTon3005 5? RCIEreSufres  that5TT
hazardous waste  treatment,  storage,  and disposal  be  conducted in accordance  with
operating permits.  Sections 3007 and  3008 provide access for  inspections  and for
Federal  enforcement of hazardous waste  regulations.  To  ensure that  RCRA 1s imple-
mented in  a  cost-effective  manner,  the purposes of  this objective are  to provide
the necessary data and techniques for permit  writers to  assess permit applications
and provide  enforcement  officials  with  legally defensible  sampling and  analysis
procedures and  information  to ensure  , compliance  with  permits  and  agreements.

     Objective 4.  Develop Techniaues and Procedures  to  Prevent and Contain Hazard-
ous Spins.  This  research  supports  Section 311  of the Clean Water  Act,  which
mandates that Spill Prevention, Control  and Countermeasure (SPCC)  plans  be prepared
for all  facilities engaged  in  the  production,   storage,  refining, processing  and
distribution of  hazardous materials,  and that  the  Agency  maintain  an  emergency
support program.

     Objective 5.  Provide  Ouality  Assurance 'tothe  Hazardous   Waste  Program.
This objective supports  the  major requfrement  for the  provrfsTon  of a  scientific
data base  of known quality to support RCRA regulatory activities.
                                       HW-11

-------
SCIENTIFIC ASSESSMENT

198d Program Request

     The Agency  requests  a total  of $1,511,800 and  14.1 permanent  workyears  for
this propram,  of  which $960,900 Is  for  Salaries and Expenses and  $550,900  is  for
Research and Development.   This  reflects an increase of  $22,100  and  a decrease of
$54,000, respectively.

     Develop Techniques and Procedures to Characterize Wastes for Listing and Other
RCRA Regulatory Activltl'es'IHealth  hazard  profiles  will 5i  provided to  support
the Agency's listing of hazardous  wastes under  Section  3001,  This  is a continuing
program which  covers  new chemicals  each year  as  well  as updating Information  on
chemicals considered earlier.

     Develop Technical Data Necassary to Support RCRA Treatment,  Storage and Dis-
posal Regulation's;Methods are being developed  for  assessing human health  effects
and exposure to  complex  hazardous wastes.  Additional  factors will  be considered
in formulating more  comprehensive versions  of  methods  developed in   1983.   These
methods will be  used  to  prepare detailed assessments for chemicals already  listed
in 40 CFR 261, Appendix  VIII  and  refine  RCRA  regulations  where appropriate.   Other
assessments and technical reviews  will  be  completed  for use in developing national
guidance on permitting and  monitoring  of disposal  operations  and on  site-specific
control issues that will  arise in permitting.

     Develop Techniques  and  Procedures to  Prevent  and Contain Hazardous  Spills.
Chemical-specific health  summaries  will  Be  prepared  to  assist  Tn  evaluating
hazardous spill  containment alternatives.   This  project continues  from 1983  to
cover additional  chemicals of commercial  significance.

1983 Program

     In 1983,  the  Agency is  allocating  a  total  of  $1,543,700 and 14.1  permanent
workyears to this  program,  of which $938,800 is  under  the Salaries   and Expenses
appropriation and  $604,900  Is  for  extramural  purposes  under   the   Research  and
Development appropriation.

     Develop Techniques and Procedures to Characterize Wastes for Listing and Other
RCRA Repualtory Activities^Health hazard profiles are being  prepared on approxi-
mately 20chemicals  not  previously  considered.  Approximately  40  existing  pro-
files are being updated based on additional  scientific information.

     Develop Technical Data Necessary to Support RCRA Treatment,  Storage and Dis-
posal Regulation's;  A set of first generation methods is being developed for  evalua-
ting the health hazards resulting  from multiple media exposure  to chemical  mixtures.
Health effects assessments  are  being prepared  for 100  chemicals from  40 CFR 261,
Appendix VIII.  Current estimates are that approximately six additional site-speci-
fic assessments will  be  requested and  completed to  refine  RCRA  regulations  where
applicable.

     Develop Techniques  and  Procedures to Prevent and Contain Hazardous Spills.
The 1983 Hazardous  Spills Program was  transferred to the Hazardous  waste  Program
from the  Municipal  Wastewater  Program.   Chemical-specific  health  summaries  are
being prepared on approximately 75 chemicals  to assist in the evaluation of spill
containment alternatives.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$300,000 results from the following action:

     -Congressional  Action.  (+$300,000)  Congress  added +$8,526,200 to  the Research
and Development  appropriation for  priority  activities  at  the  discretion  of  the
Agency.  This specific Increase  supports exposure assessments for 11 sting/deli sting
decisions.
                                      HW-12

-------
1982  Accomplishments

      In  1982,  the  Agency obligated a total  of  $715,200  for this program,  of which
$489,900 was  under the  Salaries  and Expenses  appropriation  and $225,300  was  for
extramural purposes under the Research and Development 'appropriation.

      Develop Techniques  and Procedures to Charcterize Wastes for Listing  and Other
RCRA  Activities.'  A total of ten new .health hazard profiles were provided to OSW as
documentation  to support the  listing of hazardous wastes under  RCRA Section 3001.
An additional  38 existing profiles were updated to include  recent scientific data.

      Develop Technical Data Necessary to Support  RCRA Treatment. Storage, and Dis-
posal Regulation"!  A total of eiqht  technical reviews  were  completed to assist 0$W
in preparing  guidance on permitting  issues and  site-specific  control  problems.

TECHNICAL  INFORMATION AND LIAISON

1982  Accomplishments

      In  1982,  the  Agency obligated a total  of  $178,900  for this program,  of which
$177,200 was  under the  Salaries  and  Expenses  appropriation  and  $V,700  was  for
extramural purposes  under the Research  and  Development  appropriation.   This acti-
vity, which  supports  research  programs  across  all  media,  was  consolidated  Into
Intermedia Programs  in   1983.   Thus,   Program Description,  1984 Program Request,
1983  Program, and  1982 Accomplishments narrative sections appear there.

MONITORING SYSTEMS AND QUAim ASSURANCE

13fl4  program Request

     the Agency requests a total of $7,016,400 and 25.0 permanent work years for this
proaram  of  which  $2,986,500 is  for  Salaries and Expenses  and $4,029,900  is  for
Research and Development.  This  reflects a decrease  of $634,400  and an  increase of
$367,800 respectively.   The  decrease  results  from  the  completion  of  one-time
laboratory equipment  purchases.   The   increase  will  help  strengthen  our  RCRA
Quality  assurance  program.  The  Increase  also reflects  the  transfer  of  exploratory
research funds to  the Intermedia program.

      Develop TechniQues  and Procedures to Characterize Wastes for Listing and Other
ffCRA  Regulatory Activities.' If the  RCRA program  is to  be  Implemented and admim's*-
tered in acost-effective manner,  there  must be procedures  for efficiently charac-
terizing particular wastes and criteria and tests for determining  if a waste constit-
utes  a  potential  hazard.  Analytical  methods  will  be  developed  to provide  more
cost effective techniques for  characterizing wastes while  improving data quality.
A protocol will be prepared and tested to determine the precision, accuracy, sensi-
tivity,  and reliability  of advanced  methods  when applied to highly toxic hazardous
wastes.  Methods will be developed for detection  of  organics in the ambient afr of
waste disposal facilities.  Research  will  continue on methods for  determining the
volatility and reactivity of wastes.

     Develop Technical Data Necessary to Support  RCRA  Treatment, Storage andDis-
posal Regul ati ons.   Monl  tori ng  research •   wi i ]   expl ore more   cost-effective  and
reliable field  monitoring methods.    Guidelines   for  post-closure  monitoring  of
ground water and investigation  of  other  effective techniques  for monitoring soils,
air, and biota will be accomplished.  Further examination of geophysical techniques
for hazardous  waste landfill  monitoring  and  development  of  an extraction procedure
for use  in determining the Teachability  of cyanide in  wastes will  be accomplished.

     Develop Technical Data and  Methods Necessary to Support  RCRA  Permitting and
Enforcement Activities.  Research  on the  Dioxi-n  Monitoring .Program will  focus on
vai1datlon of cost-effective methods for use by States.  Screening methods and bio-
logical  monitoring   methods  will   be  developed   for  use  in identifying  hazardous
wastes at permitted  sites.   Remote monitoring techniques will be  investigated for
use in issuing permits and for enforcement activities.
                                      HW-13

-------
     Develop Techniques and Procedures  to  Prevent  and   Contain  Hazardous  SgiJTs.
Tech nology and related  remote  moni tori ngtechniques required to support  regiona1
compliance programs and methods necessary to provide data to  on-scene  coordinators
in emergency situations will be developed.   Centralized  data gathering  and  interpre-
tation facilities  will  apply  methods  and  techniques  to  analyze  aerial  photos*
Satellite imagery, thermal  and roultispectral  techniques  will  be investigated to
identify spills,  spill  movement,  and to assist  in .cleanup  operations.

     Proyide  Qual ity  As su ran «   to  the  Hazardqus _Jaste  Prog ran.   The  research,
evaluati on and distributlon  of standard  reference materialswill'  continue.   On*
site laboratory performance evaluations started last year  will increase,  and  in-
clude preparation  of  many  performance samples  for  submission  to  the  analytical
laboratories.  The Agency's 01oxin  Monitoring  Program   will  be  expanded  to  ensure
that the data collected by  the Program and  regional  offices are of known quality.
Quality assurance support on methods  listed in the Office of Solid Waste's manual
"Test Methods for  Evaluating Solid  Wastes"  will  be  provided in order  to evaluate
the hazardous waste properties  defined in  Section 3001  of  the RCRA.

1983 Program

     In 1983, the Agency is  allocating  a total  of  $7,283,000 and 25.0 permanent work
years for this  program, of  which  $3,620,900  is under the  Salaries  and Expenses
appropriation and  $3,662,100  is  for  extramural  purposes under  the  Research  and
Developraent appropri ati On.

     Dev^elop;Techniques and Procedures to  Chy          Hastes for •Listing  and Other
RCRA Re^ta^ry^Acti|yi]tiiT^  Evaluation of analytical methodsi for tleternilni'hq their
precTsi on, accuracy," ancT rel1abi1i ty  is  continuing.   Studies  are  being  performed
to identify  instrument operating   conditions  and quality  assurance  requirements
for the analysis  of wastes.  The  method for the  evaluation  of  hexavalent chromium
in hazardous waste streams is continuing to  be  developed.   Analysis  of non-volatile
organic compounds listed in 40  CFR,  Appendix VIII is  being initiated.

     Develop Technical  .Data Necessary to^ Support RCRA Treatment.Storage and Pis-
posal Regulations^Research i s Being conducted on ttie  development of techni ques to
detect contamination before  it gets  to the water table.   Geophysical  techniques
to detect leachates are being evaluated.  Research is being conducted on monitoring
of leachates  resulting  from ruptured  synthethic  and natural liners.   Emphasis is
on early  and continuous detection  and development of   an extraction  procedure  for
organic wastes.

     Develop Techni cal  Data and Methods Necessary to  Support  RCRA  Permitting  and
Enforcement Ac tl vvti es.  The program  continues" to improve  the methods  for dioxin
detection arid"provides technical   assistance  to  regional   and State  enforcement
officials.  Methods are being  developed to  provide  screening of waste  samples in
the field and to  determine  corrosivity, ignitability,  reactivity,  and flash points
of wastes.

     Develop Techniques; and Procedures  to Prevent and   Contain  Hazardous  Spills.
The 1983'  Hazardous SpiVi s Program" was"transferred to"  'the Hazardous  Waste i^rogfam
from the  Municipal Vlastewater  Program.  Remote  sensing of  spills  by  providing
overhead aerial  support and interpretation  for EPA's Spill  Prevention, Containment
and Control  (SPCC) Program,  and for  river spill  contingency  planning   is  being
accomplished.

     Provide  Quality  Assurance  to the Hazardous Uaste Program.   This program is
developing,  evaluating, and providing standard  reference materials in  supoort of
RCRA waste  characterization.   Maintenance  of  a  repository  of  standard  reference
materials containing priority pollutants and hazardous  substances which will  serve
as a single,  traceable source  of known purity standards  for monitoring activities
is being  continued.  Support  is  being provided to the  OSW  in the  areas of methods
validation,  development of  quality  assurance criteria  for analytical  data and con-
tinued research on dioxin and dibenzofuron monitoring.
                                      HW-14

-------
1983 Explanationof Changes fromBudgetEstimate

     The net increase of +399,700 results from the following action:

     -Congressional Action.  (+S99S700)   This  increase  includes  +599,700  of  the
$10.5 million Salaries and Expenses add-on which supports the 480 additional  perma-
nent full-time workyears provided to the Agency.

1982 AccoinplistCTents

     In 1982 the Agency obligated a total of 56,734,300  for this program,  of  which
$2,408,200 was under the Salaries and Expenses appropriation and $4,326,100 was for
extramural purposes under the Research and Development appropriation.

     Develop Techniques and Procedures to .Characterize Wastes for Listing and  Other
RCRAReguTatory' ActivltleTIThe program  identified  the  various qualitative proce-
dures for  characterizing  hazardous  wastes  found  in 40 CFR  261,  Appendix  VIII.
Initial  efforts  in hazardous  waste  characterization employed  the  best available
sampling and analytical methods.  These  methods  were evaluated  for application to
the problems  of  waste  characterization  and for  development of  quality assurance
procedures.  Analytical  methods  were  evaluated  for  analysis  of  environmental
samples of  hazardous   wastes.   Evaluation  of hexavalent  chromium identification
methodologies was initiated.

     Develop Technical Data Necessary to Support RCRA^ Treatment.,Storacie and pisp_o-
sal Regulations'.   The	search fo?effective  technologies  tHaT'ensure publfc protec-
tion is  complicated by  the fact  that  different wastes  have   different  storage,
treatment, and  disposal   requirements.    Consequently,   multimedia   techniques  for
monitoring in  the  vicinity of  waste  disposal  facilities were  investigated.   Re-
search associated with the techniques to  monitor  for  ground water contamination at
hazardous wastes  sites was  conducted.   An extraction  procedure was  evaluated to
determine its  usefulness  as  a method  for  determining  the leachability  of  toxic
components of solid wastes.

     Develop Technical Data and Methods Necessary to Support  RCRA  Permittingand
Enforcemeat Activities.  Activities to  support this':oijective;riricTudeo':''  (i/re-
se'a rch" on a Tap i d f i eld- sc reen 1 ng methodology for enforcement actions; (2) guidance
for evaluation of  closure/post-closure  monitoring proposals;  (3)  development of
remote sensing techniques for  waste  site  characterization; and  (4)  guidance to
permit writers in  evaluating  the  adequacy  of monitoring  proposals  contained in
permit applications.  Assessments were conducted on the validity and appropriateness
of information contained  In  disposal  permit  applications.  Chemical  composition
information and proposed monitoring plans were specifically addressed.

     Provide Quality Assurance to the Hazardous Waste Program.  Two standard refer-
ence mTtiHliTrTJiTedeveTo^JeirToT^^                               An interim proce-
dure for conducting the Ames  test  for toxlcity was  completed.   Evaluation of pro-
tocol procedures for obtaining  and  analyzing hazardous waste  samples were evaluated.
Intercomparison studies were conducted on the performance of contract laboratories.

HEALTH EFFECTS

1964 Program Request

     The Agency requests  a  total  of  $968,100 and  4.0 permanent workyears for this
program, of which  $381,200  is  for  Salaries and  Expenses and 5586,900  1s  for Re-
search and Development.   This   reflects  an  increase  of  54,700  and a  decrease of
$105,000 respectively.  The decrease reflects the  transfer  of exploratory research
funds to the Intermedia program.

     Develop Techniques and Procedures to Characterize Wastes for Listing and  Other
RCRA Regulatory Activities^me goal  of  this programis to provide an inexpensive
and rapid qualitative  screening protocol  (prescreen)  for use In characterizing the
health hazards of  RCRA regulated substances.  The research program  will  focus on
                                         HM-1S

-------
developing a biological  testing  battery  of short term tests to determine potential
adverse human health effects.  These tests will  emphasize  exposure to complex mix-
tures.  Once  completed,  these tests  will  support  "listing/del is ting  decisions  as
well as permitting and enforcement activities.

1983 Program

     In 1983, the Agency is  allocating a  total of $1,0.68,400 and 4.0 permanent wOrk-
years to this program, of which  $376,500  is  under the Salaries and Expenses appro-
priation and $691,900 is for extramural  purposes under the Research and Development
appropriation.

     Develop Techniques and Procedures to Characterize Wastes for Listing and Other
RCRA Regu 1 atory Acti vl tvelu   Short-terra  test  systems  For  use  fn evaluating  the
heal th effects of' expos ure to complex hazardous waste mixtures are being developed.
These test systems  are  state-of-the-art  for  testing  single compounds  but require
development and validation for use on complex mixtures.

1983 Explanation of Change from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982, the Agency obligated a total of SI, 332,400 for this program, of which
$57,300 was  under  the  Salaries  and  Expenses  appropriation and SI, 275, 100  was  for
extramural  purposes under the Research and Development appropriation.

     Devel op Techni ques and P rocedures to Characterize Wastes for U i sti ng and 0 ther
RCRA Regulatory Activities^   Development  of a neurological  field testing :systeflt to
dete rmine the adverse effects of exposure to hazardous wastes on human behavior was
completed and is being validated.  A normative data base was developed to determine
human sensory, cognitive, and motor performance capabilities.  This effort provided
a battery  of tests  to  rapidly  identify  health problems  in workers  at hazardous
waste sites.   The tests will also  be used during permitting, compliance monitoring
and cleanup operations.

EJVIRONMEKTAL EPINEERING AND TECHKOiggY

1984 Program Request

     The Agency  requests  a  total of S13, 251,800 and  60.0 permanent  workyears  for
this program,  a  decrease of $4,826,800  and  10.3 permanent workyears  from 1983,
Included in this total  is  $3,684,700 for Salaries and  Expenses and $9,567,100 for
Research and Development, with decreases of $1,215,500 and $3,611,300 respectively.
This decrease  primarily  reflects  the transfer  of $1,561,000  in  exploratory  re-
search funds to the  Intermedia program; the completion  of  spill control technology
development projects where  a  reservoir  of techniques have  been provided, $949,500;
the completion of initial testing  for  advanced thermal  technologies,  $960,900;  and
the completion  of  technical  manuals  for   storing  hazardous  wastes,  $846,600.

     Develop Technical  Data Necessary _ to Support RCRA Trea^ent, Sto^rage and _____ Ojs-
                    Section 3004 of  RCRA requires the : Agency  to i  prbmiaTgaTe^regut-
atTohs etabli slifng  performance   standards  for  both new  and  existing  facilities
that treat,  store,  and  dispose of  hazardous  wastes.  In  order for regulations "of
such a comprehensive  nature to be  effective  without  over regulating,  a  thorough
understanding is  required  of  the operational  characteristics  of  different kinds
of treatment and  disposal  available as well as  the  scientific  and technical prin-
ciples they employ.  Therefore, analytical methods to determine  Incinerator destruc-
tion efficiency and a methodology  for continuous control technology monitoring will
be developed to support regulations.  Research will  focus on development of method-
ologies for measurement protocols.   landfilUng  will  remain the predominant method
                                          HW-16

-------
of hazardous waste storage and disposal for the  foreseeable  future.   Research  will
focus on  the  study  of  synthetic and  natural  linars  to  determine their  expected
service life and their abilities to  retain and/or  retard  the movement of hazardous
pollutants.  Research on  containment systems will  be  conducted to provide  sound,
reliable information  for policy  guidance to  State  agencies  and in  determining
whether regulations are adequate  or  excessive.

     Design, operation, and closure  procedures for surface  Impoundments  of hazard-
ous wastes will  be  developed to minimize environmental  and health iroacts.  Research
to establish a better understanding  of emissions from  stored volatile organic  com-
pounds, locating and repairing  damaged  liners,  and  the performance of  existing
impoundments will   provide  guidance  for  improved  cost  effective  regulations  and
design.  Land treatment  research will  be  directed  toward  determining  optimum tech-
niques for using the assimilative capacity  of the land for application of hazardous
wastes, providing guidance on  leachate control,  site selection, fate  and transoort,
and establishing waste loading rates comensurate with  organic degradation.

     Develop Technical Data and Methods Necessary to Support  RCRA  Permitting  and
Enforcement Activities.Hazardouswasteregulationsprovldebroaddesignand
operatinefsl;and₯rW"necessary to protect human health  and the environment  from the
mismanagement of hazardous wastes.   These  regulations,  however, do not provide the
detailed technical  data  necessary for  permitting and  enforcement  officials  to re-
view and make technical  evaluations  to determine whether a  proposed  facility  will
meet the  performance  standards  stated  in  the  regulations.  Technical  Resource
Documents (TRDs) will be  updated for disposal  facilities to provide  more detailed,
up-to-date guidance  to the  Regions   and State  agencies responsible  for permitting
hazardous waste  disposal  facilities and  enforcing  applicable regulations.   The
TRDs will document procedures  for  design,  operation,  maintenance, and  closure  of
facilities and the extent  to  which  these procedures  will  minimize the  release  of
pollutants to the environment.

     Research will  focus  on  the assessment  of  Incinerator  performance and other
high temperature processes which  may  be used in the  destruction  of  hazardous wastes.
The research  is divided  into  four areas:  laboratory  scale  incineration,  pilot
scale incineration,  high  temperature industrial processes,  and  field performance
assessment of full  scale incinerators.   Laboratory scale  research will focus  on
the development of destruction efficiency and by-products formation data of select-
ed hazardous compounds when exposed  directly to a flame and to elevated temperatures
in the absence of a  flame.  To allow verification  of  industry sponsored trial  burn
data and  to  provide  the  basis  for  a methodology needed  to evaluate  full  scale
facility performance  on  new  wastes  or under  varying operating  conditions,  pilot
scale research will  develop data on destruction efficiencies  of two  types of inciner-
ators for listed hazardous  wastes  as  well as  special wastes of specific  interest
to the Regions and States.  In addition,  data on air emissions by-product formation
and monitoring requirements will be  developed to assist the Agency  Permit Assistance
Team.

     The destruction  of  hazardous  wastes in high  temperature industrial processes
will be  investigated.  A  series  of  guidance  documents and an engineering data base
will be  prepared on  the disposal of these  wastes  by  their  combustion  as  a fuel.
The research  on full  scale  incinerator facilities will  concentrate  on assessing
the performance  of  various   incinerators  and  other   combustion   facilities  being
used by  industry  for combustion of hazardous wastes.   Special attention  will  be
devoted  to  dioxins,   polychlorinated  biphenyls  and   furans*  Evaluation   of  the
technologies available  for treating,  storing  and  disposing  of  these  chemicals
will be  provided in  manual form.

     Develop Techniques  and  Procedures to Prevent  and  Contain  Hazardous Spills.
Reports  will be issued summarizing research on the evaluation of specialized equip-
ments a;nd techniques for preventing, controlling, removing,  and  disposing of hazard-
ous materials spills.  Technical support to the program offices, Regions and States
will be  provided.
                                       HW-17

-------
1983 Program

     In 1983, the  Agency  is allocating a  total  of $18,078,600 and  70.3  permanent
workyears for this program, of which $4,900,200  is  under  the  Salaries and Expenses
appropriation and  $13,178,400  is  for  extramural  purposes  under  the  Research  and
Development appropriation,

     D^e ye lop Technical  Data  Necessary  to  Support	RCR.A_ Treatment,  Storage and
DisggsaTZ ReguTati on s.Research is Being  conducted  on  process"measurement and the
development of  improved  sampling  and  analysis protocols  which  can  be used  to
routinely test  incinerators  being  used to dispose of  hazardous  wastes  to  ensure
they maintain their destruction efficiency.

     Research to  assess  and optimize  the component  performance  of  landfills  and
surface impoundments  of hazardous  wastes is  developing  user  manuals to  provide
technical assistance to State and local governments.   Manuals  addressing minimizing
moisture infiltration  and  leachate generation,  chemical  stabilization of  wastes,
evaluation of  liner materials  for hazardous  waste  landfills,  and  evaluation  of
techniques for  assessing  pollutant release  from  1n-place wastes  and contaminated
soils are being prepared.

     Land treatment of hazardous waste is being evaluated on  a pilot scale  as a
potential cost  effective   means  of  treatment  and  disposal.   Percolation  rates,
microbiological  degradation rates,  soil  changes, management  techniques, site closure
procedures, loading  rates,  nutrient balances,  metals uptake,  "pre-treatment"  re-
quirements, are being developed and evaluated.

     DevelopTechnical Data and. Methods Necessary to .Support  RCRAPermitting^and
Enforcement Activities,  technical  Resource^ DocuSerits representing Best Engineering
Judgment for the design, operation and  closure  of  hazardous waste disposal  facili-
ties are being  prepared.   Laboratory  and  pilot  scale  research is  being  conducted
to better define the operating conditions required for the destruction of  hazardous
wastes and to simulate  full  scale  incineration  conditions.  This  includes research
on destruction  efficiencies, by-product formation  and air emission characteristics
to allow scale-up to full  scale incinerators.

     Research is being conducted to obtain  emission and  performance  data at  full
scale industrial  facilities  for  the   combustion  of  hazardous  wastes mixed  with
conventional fuels  in  industrial boilers,  wet  and dry cement  kilns, and  in  lime
kilns.  Research is being  conducted to evaluate advanced  hazardous waste  treatment
technologies including studies on  advanced biological  conversion  processes,  super-
critical solvents  and  metals   recovery  using  adapted  metallurgical  techniques.

     Deyelop Techniques and Procedures  to Prevent  and  Contain  Hazardous Spil1s.
The 1983 Hazardous  Spil Is Program was transferred to the  Hazardous  Waste Program
from the Municipal  Wastewater Program,   Research 1s  being conducted  to evaluate
Improved methods and technology for determining  spill cleanup priorities, evaluating
alternative cleanup techniques,  and restricting the  movement of  spilled material
by containment  and  confinement devices.   Specialized   equipment  and  techniques
from different  industries  are  being  evaluated for  adaptation  to  spills removal.
Manuals are being prepared for  State and local governments and private spill cleanup
managers.

1983 Explanation PfChanges from Budget Estimate

     The net increase of +$3,145,300 results from the following actions:

     -Congressional Actions.  (+$3,145,300)   EPA's  application  of  Congressional
action to this activity resulted in the following changes.

     (+$375,300)  This  increase  includes   +$375,3'00  of  the $10,5  million Salaries
and Expenses add-on which  supports  the 480 additional permanent full-time workyears
provided to the Agency.
                                          HW-18

-------
     (+$2,500,000)  Congress  added  +$8,526,200  to  the  Research  and  Development
appropriation for priority activities at the discretion of the Agency.  This specific
increase supports  land  disposal  regulations  and guidance  documents  (+52,000,000)
and the  feasibility  of using  land treatment  for  various hazardous  waste  streams
(+$500,000).

     (+$270,000)  Congress directed  an increase of  +5270,000  to the  Research  and
Development appropriation for the Phosphate Rock Study.

1982 Accomplishments

     In 1982, the Agency obligated  a total  of  $16,930,500  for this program, of which
52,486,200 was  under  the  Salaries   and  Expenses  appropriation  and $14,444,300  was
for extramural purposes under the Research and Development appropriation.

     Develop Technical  Data  Necessary to Support Treatment.,  Storage and  Disposal
              Research  was ini tiated  to  develop 'sampling" "and  analysis protocols
to routinely test incinerators to ensure  they maintain their destruction efficiency.
Test methodologies  were  developed  for determining  movement  of  selected  metals in
various soils.  An initial assessment of  synthetic  liners was completed.  A computer
program to aid  landfill planners and  designers  by  simulating  hydroTogic character-
istics of landfill operations was completed.

     The "Two Dimensional Subsurface Drainage Model" was developed in order to pro-
vide technical  support  information  for establishment of performance standards and
formal ization of  a regulatory  support  tool  for  evaluating  landfill  designs.   A
mathematical  model was developed for predicting volatile organic compound emissions
from landfills and impoundments,

     A Technical  Resource Document  titled  "Hazardous  Waste  Land  Treatment"  was
completed.  Industrial wastes  on  the  Standard  Industrial  Code list  were  reviewed
and a report was published which listed the hazardous wastes that are viable candi-
dates for land treatment.

     Develop 'Technical Data and Methods Necessary to Support  RCRA  Permitting  and
E n f orcement Sct'f v ffi'ijs".  Eight  Technical  "Resource  Documents  were prepared  repre-
sentUng best engi neeri ng  judgement  for the management of  hazardous  wastes  by land
disposal, land treatment, and surface impoundments.

     Engineering assistance was provided to develop engineering,  cost and  perfor-
mance models  for  a  range of   incineration  systems.   Innovative  technologies  for
treatment, destruction and  recycling  of  hazardous waste  streams were evaluated.
Technical support  for  the At-Sea-Incinerat1on  program was  provided.  Construction
of the  Combustion Research Facility was  completed and pilot-scale testing  of  a
rotary kiln  incinerator  was   initiated.   Thermal  decomposition  profiles  for  15
hazardous compounds were completed in laboratory scale equipment.

ENVIRONMENTAL PROCESSES AND EFFECTS

1984 Program Request

     The Agency  requests  a total   of $4,641,200 and  30.8  permanent  workyears  for
this program, of which  52,452,300 is  for Salaries and Expenses and $2,188,900 is for
Research and  Development.  This reflects an increase of $34,400  and a decrease of
5371,000 respectively.  This  decrease reflects  from the  transfer  of  exploratory
research funds to the Intermedia program.

     Develop  Techniques and Procedures to Characterize Wastes  for Listing and Other
RCRA Regu I atory Actl y t tl₯s"I  Research will  focus on the development  of' methods ana
data for determining the potential biological impacjts of wastes  proposed  for listing/
deli sting under  Section  3001  of RCRA.   Screening  methods  and data  for  assessing
the environmental mobility and  subsequent impact of wastes on  human health or the
environment will  be  provided  and  the feasibility  of using  aquatic dose/response
data to indicate potential mammalian toxicity will  be assessed.
                                         HM-19

-------
     Develop Technlca 1Data Necessary to S uppgrt  RCRATreatment. S torage, and 0 i s-
posal ReguJationJ^  In order to implement regulations which are bothcost-effective
arid' envir.prtnentally  safe,  research   supporting  the  assessment  of  cost-effective
regulatory alternatives will produce  multimedia methods for predicting the potential
impacts and risks to human health from various regulatory  (mainly disposal) options.
In  addition,  a  two dimensional  ground water model  and  microcosm  technology will
be  field-evaluated to  determine  both the suitability  for predicting what actually
happens in the environment and to determine the environmental and chemical-specific
factors that control hazardous waste  behavior in ground water.

     Develop Technical Data and Methods Necessary to Support  RCRA  Permittingand
Enforcement Ac|.iv1ti&s.  Criteria  developed  in 1983' for  selecting ~and evaluating1
"sitfs=for  land  disposal   facilities  will be  evaluated in  several  hydrogeological
settings in  1984 jointly  by  EPA  and  USG5.   The  research  will  provide improved
guidelines for permitters  to  evaluate  sites  based  on the potential  for migration
of  pollutants in the subsurface environment.

     Develop Techniques  and  Procedures ta Prevent  and Contain Hazardous  Spills.
The program  will  evaluate  an"3correlate  bioassay,analytical  afvi  statistical
procedures to be  used  in measuring and  predicting  the  potential  ecological   impact
of  spills  or  releases of  hazardous  materials.   The  results  of  field evaluations,
bioassays and laboratory analyses of  field samples will be correlated and recommen-
dations made  which  specify which  test or  combination  of tests provides  the most
valid and cost-effective  tool  for  predicting  the ecological  impacts  of spills and
release of hazardous materials.

1J83 ^Program

     In 1983, the  Agency  is  allocating a  total  of $4,977,800  and  30.8 permanent
workyears to this  program,  of  which  $2,417,900 is  under  the  Salaries and Expenses
appropriation and  $2,559,900  is  for  extramural  purposes under  the Research  and
Development appropriation.

     Develop Techniques and Procedures  to Characterize Waste for Listing  and Other
RCRA Regulatory'Actlviti'eTi  Activities supporting the objective of determining the
feards posed from exposure include  developing  cost-effective, standardized  proce-
dures for predicting  environmental  mobility  and  subsequent biological  impacts of
hazardous waste  and  devising  predictive  systems  for  use   in  prescreening RCRA
materials to  rapidly  determine the  potential health  and  environmental  effects of
those materials.

     Develop Technical Data Necessary to Support  RCRA Treatment, Storage,' and Dis-
posal ReguTatTolfsTongoing research  supporting the analysis of alternative  treat-
ment and disposal  options  includes  development  of  a two-dimensional  ground water
model for predicting  movement  of  wastes  and  development  of  multimedia methods to
predict the Impacts of wastes  that escape into the environment.

     Develop Technical Data and Methods Necessary to Support  RCRA  Permitting  and
Enforcement'Activities.  Efforts are proceeding to  develop  hydrogeologic criteria
for evaliiattng the""siiitab 11 ity of  proposed sites for  disposal  of  hazardous  wastes
in coordination with  the USGS.  These  criteria  will be  used  by  permit writers to
accept or reject applications  for  treatment,  storage, or disposal  facilities.  The
criteria will be field evaluated jointly with USGS.

     Develop Techniques and Proceduresto  Prevent and  Contain  Hazardous Spills.
The 1983 Spills  Program was  transferredto  the  Hazardous Waste  Program  from the
Municipal  Wastewater Program.  Currently, the reliability of bioassays for describ-
ing or predicting actual  field conditions is unknown.  The objective of the program
is to develop the  capability  to  correlate new or existing bioassay procedures and
analytical results with quantifiable  field conditions.
                                          HW-ZO

-------
1 983 Expl anatl on of Changes from Budget Estimate

     The net increase of +599,700 results from the following action:

     -Congressional Action.  (+$99,700)   This  increase  includes  +$99,700   of  the
S10.5 million salaries and Expenses add-on which supports the 4-80 additional oerna-
nent full-time workyears provided to the Agency.

1982
     In 1982, the Agency obligated a total of 53,355,600 for this program, of which
SI, 664,400 was under the Salaries and Expenses appropriation and 51,691,200 was for
extramural purposes under the Research and Development appropriation.

     Develop Techniques and Procedures to Characterize Hastes for j.l5t1n.g_and_iVthe_r
RCRA fegul at'ory Aptiyi ti' es~.  A protocol  for  evaluation of  waste leachate loxicTty
(both acute and chronic]" using  Oaphnia Magna was provided  for  standardization.  A
methodology was developed for determining, on a mass balance basis, rates of uotake
and excretion of  potentially hazardous organic  chemicals  by fish  (for comparison
with mammalian data).  A multi -elemental  method  for analysis of suspended minerals
in hazardous  wastes  by inductively  coupled  plasma spectroscopy was  provided for
cost-comparison with other methods.

     Develop Technical Data necessary to Support  RCRA ^ Treatment, L Storage ^ and Dis-
posal jeju^atlons,'  A review was  published related to modeling of 'chemTcaTTeaetTon's
a nci tran spb" rt 1 'n~ ground water  systems.  A  description of methods  available for
predicting leachate plume migration was published.

     Devel op Technical Data and Methods Necessary to Support  RCRA  Permitting  and
Enf orcement j\ctl vrtles.  A  number  of technical3  assistance  requests  related to the
u s"e of  ground " "'wafer'"' model s as  they apply  to  permits  for  hazardous  waste   sites
under RCRA were completed.
                                      HW-21

-------
Page Intentionally Blank

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                                                              \
                               1984 Budget Estimate

                                Table of Contents


                                                                            Page
HAZARDOUS WASTE
    ABATEMENT & CONTROL
       Waste Management Regulations, Guidelines and Policies	  HVI-23
       Financial Assistance.	  HW-27
          Hazardous Waste Management Financial Assistance to States.......  HW-28
          Resource Recovery Local Financial Assistance..	  HM-30
       Waste Management Strategies Implementation	  HU-31
          Hazardous Waste Management Regulatory Strategies Implementation.  HVf-33
          Salld Waste Management Program Implementation	».  HW-35
       Technical Assistance	,	  HH-36
          Technical Information Development	  HW-37
          Solid Waste Technology Assistance Delivery	  HW-37
       Uncontrolled Hazardous Waste Sites	  HVI-39
                                       HW-22

-------
                                   HAZARDOUS  WASTE

                 Waste Management Regulations,  Guidelines  &  Policies

                                ACTUAL    BUDGET    CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE -
                                           1983       1983             1984 VS 198:3

                                (DOLLARS  IN THOUSANDS)

PROGRAM
Regulations, Guidelines
& Polic-ies
 Salaries & Expenses           $6,623.0   $6,55.9.0   $6,833.7    56,928.3      $94.6
 Abatement Control  4          $14,851.1  $17,160.0  $17,282.0   $13,664.0  -$3,618.0
 Compliance
                       TOTAL  $21,474.1  $23,719.0  $24,115.7   $20,592.3  -S3,523.4

TOTAL:
 Salaries & Expenses           $6,623.0   $6,559.0   $6,833.7    $6,928.3      $94.5
 Abatement Control  &          $14,851.1  $17,160.0  $17,282.0   $13,664.0  -$3,618.0
 Compliance

Waste Management       TOTAL  $21,474.1  $23,719.0  $24,115.7   $20,592.3  -53,523.4
Regulations,
Guidelines 4 Policies


PERMANENT WORKYEARS
Regulations, Guidelines           123.2      116.8      123.4      116.4       -7.0
& Policies

TOTAL PERMANENT WORKYEARS         123.2      116.8      123.4      116.4       -7.0


TOTAL WORKYEARS
Regulations, Guidelines           161.4      157.7       164.3      155.9        -8.4
& Policies

TOTAL WORKYEARS                   161.4      157.7       164.3      155.9        -8.4
                                       HW-23

-------
                                   HAZARDOUS WASTE


                Waste Management Regulations, Guidelines, And Policies


 Budget Request         ,                                                            •

      The Agency requests a  total  of $20,592,300 and 116.4  permanent workyears  for
 1984.  This  1s  a decrease  of $3,523,400  and  7.0 permanent  workyears from  1983.
 Included 1n this total 1s $6,928,300 for  Salaries  and  Expenses  and  $13,664,000  for
 Abatement, Control,  and  Compliance.   The  decrease  1s  primarily  associated  with
 the completion  of  data  collection  activities   for the regulatory Impact  analyses
 of the core hazardous waste regulations.

 Program Descr1ption

      The Agency's hazardous  waste  regulatory,  guidance, and policy  making  activi-
 ties are  carried out  under this program.   Activities Include providing  national
 guidance and  oversight to  the Regions and States for  Implementation  and  enforce-
 ment of the  hazardous waste  regulatory   program,  reviewing and revising  existing
 hazardous waste  regulations,  and  completing   the  development  of  the  hazardous
 waste program to fill in  key regulatory gaps.

      Regulations,Guidelines, and Policies — This program provides  for the  manage-
 ment of the  nationalResource Conservation and Recovery  Act  (RCRA)  Subtitle  C
 hazardous waste  program.    Included  are   the promulgation  and  refinement  of  the
 criteria and  regulations  for  Identification,   tracking,  management, and  disposal
 of hazardous  wastes;  technical  studies;   regulatory  Impact  and economic  analyses;
 and assessments  of  control  options  and  technologies  necessary  for  regulatory
 decision-making.  Activities  also   Include  Issuing  guidance to  the  Regions  and
 States for nationally  consistent  administration of the Subtitle C  regulations  and
 developing and evaluating Implementation  policies.

 REGULATIONS. GUIDELINES,AND POLICIES         .

• ^M Program Request  ,      •          -                '  '

      The Agency requests a  total  of $20,592,300 and 116.4  permanent workyears  for
 this program, of which $6,928,300 1s for the Salaries  and Expenses  appropriation and
 $13,664,000 1s  for  the  Abatement,  Control, and Compliance  appropriation.   The
 $94,600 increase to Salaries and Expenses  results from  Increased payroll costs.  For
 Abatement, Control, and Compliance,  the decrease of $3,618,000  results from  comple-
 tion of data  collection  activities  associated  with the  regulatory  impact  analyses
 of the core hazardous waste regulatory program.

      Under this program,  the Agency will  provide guidance  and assistance to  the
 Regions and States on State authorization and permitting activities.   This  Includes
 timely review  of authorization  applications and  guidance and  assistance to  the
 Regions and  States  to  help  States  meat  authorization requirements.   Permitting
 activities will focus on developing  guidance to permit writers and  applicants  for
 Incinerator and land  disposal  facilities.   Permit assistance teams  will be avail-
 able to advise  on  technically  difficult  permits, particularly land disposal,  In
 order to ensure national  consistency of Initial  permits.                      ,  •

      This program also Includes developing and  distributing national  guidance  for
 and evaluation  of  compliance  monitoring  and technical  enforcement programs 1n  the
 Regions and states.          <         A~

      The final  component  of the Regulations, Guidelines,  and Policies program is
 regulation development.  In 1984, the  Agency will continue to  review and  reassess
 the existing RCRA  regulations.  The Agency will propose restricting  certain wastes
                                        HW-24

-------
 from land  disposal  and  will  promulgate  amendments  for  the  definition of  solid
 waste, the hazardous waste  mixture  rule,  and for class permits  for  containers  and
 tanks.

      The Agency will  also address new regulatory efforts which are designed to bring
 under regulation those wastes and processes not currently  covered,  or inadequately
 covered, under the existing  RCRA regulations.   Regulations to be proposed  to fill
 in these key  regulatory  gaps  will  cover waste oil, burning  of hazardous wastes in
 boilers, and organic  chemical wastes.  The Agency will  also continue  work on  regula-
 tory activities for small quantity generators.

      The industry studies  program will focus  on  RCRA  §3001  generic  listings  for
 the organic  chemicals  industry.   The   Agency  will  propose  listings  for  several
 classes of chemicals including chlorinated aromatlcs, organic bromines,  and carba-
 mates and will  examine the plastics and  synthetic rubber  industries in order to
 support future RCRA §3001 listing decisions.

      The Agency  will   also  be  developing  technical  legislative  changes  dealing
 with the  adequacy  and workability  of  the  Post-Closure Liability  Trust Fund  and
 proposing financial   responsibility  requirements   rules  for  corrective actions.

      The Agency will  conduct regulatory Impact analyses  for Its regulatory efforts.
 As part of this effort, the Agency will  apply the  degree-of-hazard model  to  analyze
 and compare the costs, risks and benefits of different  waste management  strategies
 in order to develop a  comprehensive assessment of the regulatory effects on indus-
 try and the environment.

 1983Program

      In 1983, the Agency  is allocating  a  total of  $24,115,700  and  123.4 permanent
 workyears to  this program,  of which $6,833,700  1s for  Salaries and  Expenses  and
 517,282,000 is for extramural purposes  under the Abatement, Control, and Compliance
 appropriation.                                                  "

      The Agency will  provide guidance  to Regions  and States on State authorizations
 and permitting.   In addition, permit assistance teams  will  provide expert technical
 and procedural assistance  for the  development of  Initial  facility  permits.   The
, Agency will  also schedule the first annual RCRA program  reviews to  assess Regional
 and State performance.

      Compliance monitoring and enforcement guidance will  be provided to the  Regions
 and the States  to  assure State  accountability and  national   consistency  with RCRA
 requirements.

      The Agency  will  continue to  review  existing  RCRA regulations.  The  interim
 final land  disposal  standards'promulgated  in 1982 will  become effective.   Five
 regulatory impact analyses  of the  core  RCRA §3004  technical   facility  standards
 promulgated In 1931  and  1982  will  be  conducted.   In  addition, the Agency  will
 propose and/or develop  minor technical  amendments and  clarifications  to  earlier
 RCRA regulations, including  the  hazardous  waste  mixture  rule,  the  definition  of
 solid waste, and the definition of monofill  wastes.

      The Agency will continue Its review  of  Interim status ground water monitoring
 requirements with the analysis of facility sites that were sampled.

      The Agency  Is  also   beginning  to  develop regulations  and  conduct  regulatory
 Impact analyses  for wastes  and/or processes  not currently  covered by the hazardous
 waste standards.   Regulations being developed include  waste oil, burning of  hazard-
 ous wastes In boilers and air emissions  from  facilities.  The  Agency will also begin
 examining regulatory requirements for  small  quantity  generators.   Data  collection
 activities are planned to define existing practices  for these  wastes or processes
 and to Identify areas where regulation  is  needed.
                                        HW-25

-------
     The Agency  will  continue the  Industry  studies program to  identify  hazardous
wastes that  are  currently not regulated  and establish  a  comprehensive  data  base
for the  RCRA §3001  waste  listings  decisions.   The pesticides, dyes  and  pigments,
and industrial organic  chemicals industries are  being examined.  The Agency  will
propose a generic listing for chlorinated aliphatics.

     As a part of the paperwork reduction efforts, the Agency is planning  revisions
to annual reporting requirements  and  will  promulgate  the national  uniform manifest
and develop class peraits for containers and tanks.

1983 Explanation ofChangesfrom Budget Estimate

     The net Increase of +$396,700 results from the following actions:

     -Congressional  Action.  (+$233,700]  The  Congressional  add-on to this  activ-
ity of+$122,000 to the  Abatement,  Control  and  Compliance  appropriation was  for
the academic training program.

     (+5111,700)   This  increase  includes +$111,700 of the S10.5 million  Salaries
and Expenses add-on which supports the 480 additional  permanent full-time  workyears
provided to the Agency.

     -Reprogramrcings.   (+5163,000)  During the  development of the  ooerating olan,
several reprogrammings  were  made to this activity  which are not  reportable under
the Congressional  reprogramming   limitations,   These   changes   resulted   in  a  net
increase of +$163,000 to the Salaries and Exoenses aporopriation.

1982 Accomplishments

     In 1982, the Agency obligated $21,474,100 for this program including  56,623,000
for Salaries and  Expenses  and $14,851,100 for Abatement,  Control,  and  Compliance.

     The Agency  provided  guidance and training to  the  Regions  and States on  RCRA
implementation policies  and requirements.   The  annual  RCRA  guidance on State program
development, manuals on  Interim  and Full  Authorization  and  initial  permit call-in
strategies were developed.  Training to Regional and  State permit writers was  also
provided.

     The Aqenc.y  promulgated  revisions  to the RCRA  §3004 interim  final  regulations
requiring liability Insurance and financial  assurance for  closure and post-closure
by hazardous  waste  facilities.   Interim  final  RCRA  $3004 standards for existing
and new  land  disposal  facilities  were  promulgated   1n  1982.   The  Agency  also
announced Its decision  not  to suspend the RCRA §3004  existing  Incinerator regula-
tions promulgated in 1981.

     Consistent with  the  requirements  of Executive  Order  12291,  the  Regulatory
Flexibility Act,   the  Paperwork  Reduction  Act  and the  President's  Task  Force  on
Regulatory Relief,  five  regulatory  Impact analyses for  the  RCRA  §3004  regulations
promulgated in 1981-82  were  initiated.   These analyses were directed towards  land
disposal, storage  (containers  and   tanks),  Incineration, location  (seismic  and
floodplains), and financial  responsibility.  Related  activities such as  degree-of-
hazard model development  and paperwork  reduction  analyses were also continued in
1952.  The  Agency  initiated its   review  of  RCRA Interim  status  requirements,
focusing primarily  on the effectiveness of  Interim status ground  water  monitoring
requirements now in place.  Phase I  of this review, which examines past  and present
practices, was completed.

     In addition, the Agency continued  the  Industry   studies  to establish  a  com-
prehensive data  base  for  RCRA  §3001  waste listings decisions.  The  pesticides,
dyes and  pigments,  and  Industrial  organic  chemicals  Industries  were  examined.
These industries  generate high volumes of wastes, have high concentrations of toxic
products, and/or  high  persistence  and  mobility  of  products  1n  wastestreams.
                                        HW-26

-------
                                   HAZARDOUS  WASTE

                                 Financial  Assistance

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE  -
                                           1983       1983             1984 VS  1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Hazardous Waste
Management Financial
Assistance To States
 Abatement Control &          $42,344.8  $35,135,6  $44,068.0  $42,500.0  -SI,568.0
 Compliance
                       TOTAL  $42,344.8  $35,136.6  S44.068.0  $42,5.00.0  -$1,568.0

Resource Recover^ Local
Financial Assistance
 Abatement Control &             $268.9
 Compliance
                       TOTAL     $268.9

TOTAL:
 Abatement Control 8          $42,613.7  $35,136.6  $44,068.0  $42,500.0  -$1,568.0
 Compliance

Financial Assistance   TOTAL  $42,613.7  $35,136.6  $44,068.0  $42,500.0  -$1,568.0
                                      HW-27

-------
                                  HAZARDOUS WASTE


                                Financial Assistance


Budget Request

     The Agency requests  a total  of $42,500,000  for this program in the Abatement,
Control, and Compliance appropriation  for  1984.   This is a  decrease  of $1,568,000
from 1983.

Program Description

     This program provides financial assistance to State governments for developing
and implementing the  hazardous  waste management  programs under  Subtitle C  of the
Resource Conservation and Recovery Act.
     Hazardous Waste iManagOTen^ Financial  Assistance to States -- This program pro-
vides Financial  assi stance  to States to  develop,  implement, "and  enforce programs
that monitor and control  hazardous  wastes from cradle to  grave,  including genera-
tion, transportation, storage, treatment,  and disposal.

     Resource Recovery Local Financial  Assistance  —   This  program,  until  1982,
provided assistance  to  grantees  undertaking projects leading to  Implementation  of
resource and energy  recovery systems  in  their communities.   Funding was  not  re-
quested or appropriated in 1982 or 1983.

HAZARDOUS WASTE MANAGEMENT R NANCLAL ASSI STANCE, TO ^STATES

1984 Program Request

     The Agency  requests  a  total  of  S42, 500,000 for this program In the Abatement,
Control , and  Compliance  appropriation.   The  decrease of  $1,568,000  reflects  the
increasing ability  of  the  States  to   fund their  own  hazardous   waste  programs.

     States awarded  grants  must  either  be operating  a  substantially  equivalent
hazardous waste  program  undier  Interim  Authorization  or   working  toward  Interim
Authorization through a Cooperative Arrangement.  State grant targets are allocated
on a formula  basis that  accounts  for  a  State's  population, land area,  number  of
hazardous waste  generators  and amount  of  hazardous waste.   The  grant  amount  is
negotiated based on  the target,  but  depends on the  portion of the Federal program
the State is operating.

     States will use these  funds  to make  significant progress  toward  authoriza-
tion.  States will  submit applications for  Full  Authorization and  work  to ensure
that their programs  are equivalent to the  Federal  program.   Approximately  32  ap-
plications for  Full  Authorization will  be  submitted to  the Agency and  be  under
review by the end of the fiscal  year,

     States will also  play  a strong  roTe  in  national  permitting efforts.   As  in
1983, almost half  of the  State  resources  will  be earmarked for permit activities.
In order to  expedite the processing  of permits for  new  or  expanding  facilities,
States will  devote  sufficient permitting   resources  to  respond to  all  anticipated
applications from  these  facilities.   Authorized  States   will  be  responsible  for
processing as many as  345 permits in  1984.   However, the   States may  not complete
processing on  all  of  these permits to the point  of issuance  or denial  1n 1984
because of the lengthy timetable required  to fully process permits.
                                      Hvt-28

-------
     In conjunction  with  the  Federal  enforcement  program,  States  will  perform
approximately in,000  compliance monitoring  inspections.   This  number  encompasses
100 percent  of  facilities permitted by States  in  1983, 100 percent  of  major haz-
ardous waste  handlers  (interim  status  facilities  with  ground  water  monitoring
requirements, incinerators, and  selected  generators and transporters),  ?5 percent
of non-major  facilities,  and  10 percent of  the  remaining  generators and transport-
ers.  In addition, the  States  wiTl  Issue, as necessary, administrative enforcement
actions, convene  administrative hearings,  and  provide technical  support  for  the
development .of State civil actions.

1983Program

     In 1983, the  Agency is  allocating $44,068,000 to State  financial  assistance
under the Abatement, Control, and Compliance appropriation.   States are using these
funds to continue  working toward  Interim and  Full  Authorization and to  continue
operating the Federal program  for  unauthorized  phases  through  Cooperative  Arrange-
ments.

     Based on the  Agency's  promulgation  of  the  land disposal  regulations  in July
1982, Phase  IIC  (permitting  of land disposal  facilities)  and  Full  Authorization
will be  available  effective January  1983.   By  the  close  of fiscal  year  1983,  47
States and  territories  will  be in  some phase  of  authorization as  a  result  of
their progress  in developing   satisfactory  hazardous  waste management  programs.

     States with Phase  II  will  be  expected to  focus  50 percent  of their resources
on permitting new and expanding facilities and major facilities,  i.e., incinerators
and land disposal  facilities.   Cooperative Arrangement  States  will be eligible,
based on  Region  and  State  negotiations,  to  technically  evaluate  permit  applica-
tions, however, EPA  retains  responsibility  for  making  the  final  permit  decision  of
issuance or denial.

     State compliance  monitoring  and  enforcement  efforts,  in  partnership  with
Federal  activities,  will  concentrate  on  establishing  an enforcement  presence  in
the regulated  community.   State  compliance  monitoring activities  will  focus  on
Implementation of  the  uniform manifest  system, financial  responsibility  require-
ments, and treatment and storage facility permit application call-in's.  Compliance
monitoring inspections  are planned  for  approximately 12,000  facilities  and genera-
tors.  This  level  of effort  represents 100 percent  of-major hazardous  waste hand-
lers; 50 percent of non-major facilities,  especially those that will become eligible
for a class  permit  1n 1984; and 10  percent of  the remaining generators  and trans-
porters.  Appropriate enforcement actions will be taken as warranted.

1983 Exp1 anati on of  Change s f.rpm Budget Esti ma te

     The net Increase of +58,931,400 results from the following action:

     -Congressional  Action.  (+$8,931,400)  The  Congressional  add-on to this activ-
ity of  +58,931,400  to  the  Abatement,  Control  and  Compliance   appropriation  was
for the State hazardous waste financial assistance program.

1982 Accompl 1 shments

     In 1982, the  Agency obligated  $42,344,800  for this  program  under  the Abate-
ment, Control, and  Compliance appropriation.  The  grant  funds  supported continued
development of  substantially equivalent  legislation  and  regulations  required  for
Interim Authorization, Implementation of those programs, and operation of delegated
aspects of the Federal program  (manifest,  compliance monitoring,  permit evaluation)
through Cooperative  Arrangements.
                                       HW-29

-------
     States were eligible to apply for Interim Authorization for Phase I, Phase IIA
(permitting of tanks, containers and piles), and Phase 113 (permitting of Incinera-
tors).  By the end of  fiscal  year 1982, 34  States had been  Interim Authorized for
Phase I and  five of  these States  were  also  Interim^ Authorized for  Phase  1 1 A/8.

     Grant funds also  supported Cooperative Arrangements for 19  States  to operate
selected aspects of the  Federal program.   States  negotiated with Regions the tasks
they performed while  working  toward  Interim Authorization.   After  final  negotia-
tion of the grants,  both for Interim Authorized and Cooperative Arrangement States,
funds which the States could not expend were used by the Region to provide contrac-
tor support for implementation of the Federal hazardous waste program. '

     Compliance monitoring  and  enforcement activities,  in  conjunction   with  the
Federal  enforcement   program,   concentrated  on  those  handlers  which  posed  the
greatest potential  for  environmental  problems,  such  as  ground water  monitoring
facilities.  States   conducted  over  14,000  compliance  monitoring  inspections and
initiated enforcement actions  as necessary.

RESOURCE RECOVERY LOCAJ.  FINANCIAL ASSISTANCE

1984 Program Request

     The Agency is requesting  no resources for this program.

1983 Program

     The Agency is allocating  no resources to this program,

1983 ^ feplajiatioti LQ
     There was no change to this program.

1982 Accqmpl_1shme,nt5

     The Agency  obligated  $268,900  for Resource  Recovery Local  Financial  Assis-
tance under  the  Abatement,   Control,   and   Compliance  appropriation.   The  grant
funds provided support  for  projects  in three States: the  Northeast  Maryland Solid
Waste Disposal Authority; the Slue Plains treatment Facility, District of Columbia;
and the West Virginia Solid Waste Disposal  Authority.

     These resources  were  used  to  phase-out  community  development  activities
associated with these projects.
                                       HW-30

-------
                                   HAZARDOUS  WASTE

                      Waste Management Strategies  Implementation

                                ACTUAL   BUDGET     CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE  -
                                           1983       1983             1984 VS  1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Hazardous Waste
Management Regulatory
Strategies
Implementation
 Salaries 4 Expenses
 Abatement Control 4
 Compliance
Solid Waste
Management Program
Implementation
 Salaries 4 Expenses
TOTAL:
 Salaries 4 Expenses
 Abatement Control 4
 Compliance

Waste Management
Strategies
Implementation
        $6,900.9  $11,382.9  $11,352.6  $14,135.2   $2,782.6
        $2,602.3   $1,629.5   $1,678.0   $1,986.4     $308.4

TOTAL   $9,503.2  $13,012.4  $13,030.6  $16,121.6   $3,091.0
           $53.2
TOTAL      $53.2
        $6,954.1  $11,382.9  $11,352.6  $14,135.2   $2,782.6
        $2,602.3   $1,629.5   $1,678.0   $1,986.4     $308.4
TOTAL   $9,556.4  $13,012.4  $13,030.6  $16,121.6   $3,091.0
PERMANENT WORKYEARS
Hazardous Waste
Management Regulatory
Strategies
Implementation

Solid Waste
Management Program
Implementation

TOTAL PERMANENT WORKYEARS
           185.7      264.1      305.4      305.4
             1.0
           186.7      264.1      305.4      305.4
TOTAL WORKYEARS
Hazardous Waste
Management Regulatory
Strategies
Implementation    *
                                  221.1
                      342.3
383.0
411.6
28.6
                                      HW-31

-------
                                   HAZARDOUS WASTE

                      Waste Management Strategies Implementation

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)
                                                 i
Solid Waste                         1.0
Management Program
Implementation

TOTAL WORKYEARS                   222.1      342.3      383.0      411.6      28.6
                                      HW-32

-------
                                  HAZARDOUS WASTE


                     Waste Management Strategies Implementation
Budget Request
     The Agency requests  a  total  of $16,121,600 and 305,4  permanent  workyears for
1984, an increase  of  $3,091,000 from 1983.  Included in  this  total  is $14,135,200
for Salaries  and  Expenses  and  $1,986,400 for Abatement,  Control, and  Compliance
with increases of $2,782,600 and $308,400, respectively.

Program Description

     This program  includes  the hazardous  waste  implementation program  which  sup-
ports the Regional activities necessary to  oversee, and  operate when required, the
RCRA-mandated hazardous waste program.  Also  included, through  1982,  was the solid
waste program which  Involved  Regional  activities that enabled  States  to implement
Subtitle 0.

     Hazardous Haste Management Regulatory Strategies  Implementation •*-  This  pro-
gram supports the  Regional  activities  necessary  to provide  guidance  and technical
assistance to authorized  States and  to  operate the  Federal  hazardous  waste program
in unauthorized  States.   Regions  assist  the  States  in developing  substantially
equivalent hazardous  waste  management programs  to  qualify  for  Interim  Authoriza-
ation and fully equivalent  programs to qualify  for Full Authorization  which  will
be available in January 1983.

     Solid Waste Management Program Implementation --  This program included Region-
al activities designed  to  enhance  the  ability  of  the  States  to implement  solid
waste management programs under Subtitle  0 of  the Resource Conservation  and Re-
covery Act.  The Regions guided State procedures for conducting solid waste dispos-
al site  inventories and  assisted  in the  development  of  comprehensive Solid Waste
Management Plans.

HAZARDOUS WASTE MANAGEMENT  REGULATORY STRATEGIES IMPLEMEMTATION

1984 Request

     The Agency requests  a  total  of $16,121,600 and 305.4  permanent  workyears for
this program  of  which $14,135,200 is  for Salaries and  Expenses  and  $1,986,400 is
for the Abatement,  Control, and Compliance appropriation.   This  increase reflects
the heavy near-tern  workload  facing the  Agency  for both State authorizations and
facility permitting.

     The Regions*  highest priority  activity in 1984 is  State  program development.
Aggressive delegation efforts  will  ensure that a  substantial  number   of  States
achieve Interim Authorization,  particularly for Phases  IIB and  11C  which  enable
States to permit incinerators and land disposal  facilities,  and Full  Authorization
before January 1985.  The statute intends  for  the  States to have  full  responsibil-
ity for  operating  a Federally equivalent hazardous waste program.   State programs
will be  eligible  for Full  Authorization  beginning in January 1983.  The statute
requires the  States  to  receive Full  Authorization by January  1985 or  the  Agency
must operate  the  hazardous  waste program.   However,  this  deadline does  not  pre-
clude States  from  continuing  to  develop their  own  programs  and attaining  Full
Authorization at a later date.
                                      HW-33

-------
     This request will  enable  the Regions to  assist  States in the  development  of
both their authorization  aoolicatlons  and  their  program  capabilities.   The Regions
will review Interim and Full Authorization applications against substantial equiva-
lence and full  equivalence  criteria,  approve applications in a timely  manner,  and
negotiate State grants and Cooperative Arrangements.

     As a result  of  this Investment,  the Agency  anticipates that  by  the end  of
1984, 18  States will  be Fully  Authorized  and  32 States  will  have  applications
under review.   States with  Full Authorization applications  pending  by the end  of
the year  will  either  be operating under  Interim Authorization  or working  under
Cooperative Arrangements  for oortlons of the program.

     The Regions'  second  priority  1s the preparation  and  processing  of  permits  for
new and  expanding  hazardous waste management  facilities,  existing  incinerators,
and existing land  disposal  facilities  1n unauthorized  States.   These  facilities
will be  a high  permitting  priority  due  to their greater  potential   for  adverse
environmental impacts  and the  Inadequacy  of  their  interim  status  standards  to
protect and  maintain  the quality  of  the  environment.  The  Agency  will  complete
processing of  195  permits  in  1984.    In  addition, the  Regions  will  call in  205
facilities 1n  order  to maintain a timely  and  effective program to  permit facili-
ties of the most environmental  concern.

     In authorized  States,  Regions will   review  30   percent  of  the State  permit
actions to ensure  national   consistency.   Regional  review of  the Initial  State-
processed permits will  provide  to the  States  Increased  technical  knowledge  and
understanding and will  result  1n  a  stronger and  more effective State  permitting
process.

IffiSJ'rogram

     In 1983, the Agency  1s  allocating a total of $13,030,600 and  305.4 permanent
workyears to the  program of  which 511,352,600  1s for  Salaries  and Expenses  and
51,678,000 is for extramural purposes  under  the  Abatement,  Control,  and Compliance
appropriation.

     The Regions are  negotiating,  awarding,  and  administering grants and  Coopera-
tive Arrangements based  on  the  Individual  State's  authorization  status  and accept-
ance of  delegated  activities.   The  Regions operate  all  manifest activities  and
technical evaluations of  permit applications not delegated  to  Cooperative  Arrange-
ment States.

     The Regions are  focusing  on  delegating  the  various  phases of program authori-
zation.  Regions are  assisting  States  to  develop  application  packages,  design  and
strengthen their programs,  and ensure that all  Interim Authorized programs  meet
substantial  equivalence requirements.   In addition, the Regions review applications
for Full  Authorization  and  ensure that  the State programs meet  full  equivalence
requirements.  By the end of 1983, the Agency  anticipates  that 46  States will  have
at least Phase  I  Interim Authorization,  of  which  31  States will also  possess  one
or more components of Phase  II  Interim Authorization, and at least  one  State  will
be Fully Authorized.

     The second  critical  Implementation  task   is  completing  the  processing  of
322 permits.   The permitting  of additional  storage and  treatment  facilities  after
1983 will generally  be  deferred  1n  favor  of  those   facilities which  pose a.more
significant threat  to human  health  and  the  environment.   An  exception  to  this
plan will be  made,  however, when  the  Agency promulgates class permit  regulations
in 1984.  Class permits  rely on  a set  of standard,   nationwide permit conditions
for all  facilities  defined  by the Agency  as a  class.  This approach  will  reduce
the application requirements  and  permit  Issuance  time  for  most  of the  remaining
storage and treatment facilities.
                                        HW-34

-------
     The Regions  retain  responsibility   for  permit  issuance  in  all  Cooperative
Arrangement States.  Since 1983  is the first  year  of permit development by Interim
Authorized States, the  Regions will  review all  incinerator permits and ten percent
of storage and treatment permits processed by authorized States.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$18,200 results from the following actions:

     -Congressional Action.  (+$494,200)   This  increase  includes  +$494,200  of the
S10.5 mill ion  Salaries  and  Expenses  add-on  which  supports  the 480  additional
permanent full-time workyears provided to the Agency.

     -Reprogranmings.   (-5476,000)   During  the  development of  the  operating plan,
several re progr awnings  were  made to this  activity  which are not  reportable under
the Congressional  reprogramming   limitations.   These  changes  resulted in  a  net
decrease of -$524,500 to the Salaries and Expenses appropriation and a net increase
of +$48,500 to the Abatement, Control and Compliance appropriation.

1982 Accomplishments
                             4
     In 1%2, the Agency obligated 19,503,200  for this program, including *6,900,900
for Salaries  and  Expenses and $2,602,300 for Abatement,  Control,  and Compliance.

     The Regions focused  on  assisting  States  to achieve  various phases of authori-
zation.  As  of  September 1982,  34  States had achieved  Phase  I Interim Authoriza-
tion and five of these  States  had also received Phase IIA/B Interim Authorization.

     The Agency  called-ln and initiated  the permit  process for  771  storage and
treatment facilities  and incinerators.   In addition, the  Regions processed  four
permits for  new  or expanding  facilities  whose  owners  or  operators  submitted ap-
plications voluntarily.

SOLID HASTE MANAGEMENT  PROGRAM IMPLEMENTATION

1984 Request

     The Agency requests no resources for this program.

1983 Program

     The Agency is allocating no resources to this program.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982, the  Agency obligated  $53,200 for this  program in the  Salaries and
Expenses appropriation.

     The Regions  provided limited  guidance  to the  States  on implementation  of
their Solid  Waste Management  Plans.  Effective Regional  and   State  coordination
during development of  the Plans  minimized the  need  for Agency management  at the
onset of plan implementation.
                                       HW-35

-------
                                   HAZARDOUS WASTE

                                 Technical Assistance
                                ACTUAL
                                 1982
       BUDGET
       ESTIMATE
         1983
CURRENT
ESTIMATE
  1983
ESTIMATE  INCREASE +
  1984    DECREASE -
         1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Technical Information
Development
 Abatement Control 4
 Compliance
                       TOTAL
Solid Waste Technology
Assistance Delivery
Headquarters
 Abatement Control &
 Compliance
                       TOTAL

TOTAL:
 Abatement Control &
 Compliance

Technical Assistance   TOTAL
$47.5

$47.5




$50.0

$50.0


$97.5


$97.5
                                      HW-36

-------
                                  HAZARDOUS WASTE


                                Technical  Assistance


Budget Request

     No resources  are  requested  for this  program   Consistent  with the  minimal
Federal role in guidance  and  support for State and local  solid  waste and resource
recovery activities and the  increased  responsibility  of States for  Subtitle  D im-
plementation, technical assistance in these areas will not be necessary.

Program Descriptlori

     This program  enabled  the Agency  to  provide State  and local  governments,  as
well as Federal agencies,  with  comprehensive technical  assistance on hazardous and
solid waste management and resource conservation and recovery.

     Technical  InformationDevelopment — This  program  managed  hearings, meetings,
and other pub!ic participation activities under RCRA §70Q4(b) in the development of
all regulations, guidelines,  and programs under RCRA.

     Solid Waste Technology Assistance Delivery -- This  program  provided  national
programi manageme'nt including  the(Agency1s estafel ishment .of Regional level-of-effort
contracts for technical assistance and management of an evaluation reporting system
on technical assistance.   Administration  and monitoring of peer matching technical
assistance grants was also included.

TECHNICAL INFORMATION DEVELOPMENT

1984 _Prograin Request

     The Agency requests no resources for this program.

1983 Program

     In 1983, the Agency is allocating np resources to this program.

1983 Expl anati on of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982, the  Agency  obligated  $47,500  for this  program under  the  Abatement,
Control, and  Compliance  appropriation.    The   funds  were  used  to   phase-out the
Agency's participatory public education and  information  program on hazardous  waste
management technical issues.

SQL ID WASTE TECHNOLOGY ASS I STANCE DEL lYERY

1984 Program Request

     The Agency requests no resources for this program.

1983Program

     In 1983, the Agency is allocating no resources to this program.
                                       HW-37

-------
1983 Exp1anat1on_of Changes from Budget Estimate

     There was no change to this program.

V982 Accomplishments

     In 1982, the  Agency  obligated $50,000  for this program under  the  Abatement,
Control, and Compliance appropriation.   The funds were used  to  phase-out Regional
contracts for technical  assistance and  administration  of peer  matching technical
assistance grants.
                                       HW-38

-------
                                   HAZARDOUS WASTE

                          Uncontrolled Hazardous Waste Sites

                                ACTUAL   BUD.GET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Uncontrolled Hazardous
Waste Sites
 Abatement Control 4
 Compliance
                       TOTAL

TOTAL:
 Abatement Control 4
 Compliance

Uncontrolled Hazardous TOTAL
Waste Sites
5882.8

$882.8


$882.8


$882.8
                                       HW-39

-------
                                  HAZARDOUS WASTE


                         Uncontrolled Hazardous Waste Sites


Budget Request

     The Agency  requests  no funds  in  1984 for this budget activity.   Since 1982,
activities previously  funded  under this  budget  activity are  being funded  by  the
Hazardous Substance Response Trust  Fund  appropriation  created  by the Comprehensive
Environmental Response, Compensation, and Liability Act (CERCLA) of 1980.

P rogram Descri pt ion

     This activity was  an interim  program  to address hazardous  substance release
problems in a limited way before passage of "CERCLA-."

     McpA^rp1A.^d....-fejsardpus,.-Was.^ Sltgs, •-  This  program  addressed the  worst known
problensassocia'ted with  uncontrot1 edhazardous  waste  sites.   The interin strategy
encompassed site discovery  actions, investigations  to determine the most serious
sites, emergency assistance at  those  sites eligible under §311  of  the  Clean Water
Act of  1977,  and development  of  enforcement  actions  under  the  provisions  of the
Resource Conservation  and  Recovery Act  (RCRA).   The  Hazardous  Substance Response
Trust Fund appropriation  is now providing  the necessary funding  and  authority to
intensify efforts to undertake planning and Implementation of containment measures.

UNCONTROLLED HAZARDOUS WASTE SITES
                      /
1984 Program Request

     The Agency requests no funds for this program in 1984.

1983 Program

     In 1983, the Agency is allocating no funds for this program.

1983 E^pjanrtionjrf^Chan^es^ f rgm Budget^ Esjlitia^

     There was no change to this program.

1982 Accomplishments

     In 1982, the  Agency  obligated a  total  of $882,800 under the  Abatement, Con-
trol, and  Compliance  appropriatipn for hazardous waste  site  response  (feasibility
studies and analysis  at the  Arkansas  City Dump and  the LiPari  Landfill) and Super^
fund implementation activities.   These  were  the remainder  of the  funds provided
in the $14 million  1981  supplemental  for pre-Superfund  site planning  and remedial
activities.
                                       HW-40

-------
Page Intentionally Blank

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
HAZARDS WASTE

    ENFORCEMENT
       Hazardous Waste Enforcement..	,	   HW-42
          Hazardous Waste Permit Issuance	   HW-43
          Hazardous Waste Enforcement.	,	   HW-44
                                      HW-41

-------
                                   HAZARDOUS  WASTE

                             Hazardous  Waste  Enforcement

                                ACTUAL    BUDGET     CURRENT   ESTIMATE   INCREASE +
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE -
                                           1983        1983              1984 VS 1983
                                (DOLLARS  IN  THOUSANDS)

PROGRAM
Hazardous Waste Permit
Issuance
 Salaries & Expenses           53,191.5
                       TOTAL   S3,191.5

Hazardous Waste
Enforcement - Office of
Solid Waste & Emergency
Response
 Salaries & Expenses           $3,136.8   $1,896.5    $2,385.7    S3,509.5   SI,123.8
 Abatement Control  &             $378.7
 Compliance         ^
                       TOTAL   S3,515.5   $1,896.5    52,385.7    $3,509.5   SI,123.8

TOTAL:
 Salaries 4 Expenses           $6,328.3   $1,896.5    $2,385,7    $3,509.5   $1,123.8
 Abatement Control  &             5378.7
 Compl iance

Hazardous Waste        TOTAL   $6,707.0   $1,896.5    $2,385.7    $3,509.5   51,123.8
Enforcement


PERMANENT WORKYEARS
Hazardous Waste Permit             86.5
Issuance

Hazardous Waste                    83.9       46.1       70.1        70.1
Enforcement - Office of
Solid Waste 8 Emergency
Response

TOTAL PERMANENT WORKYEARS         170.4       46.1       70.1   ~"    70.1


TOTAL WORKYEARS
Hazardous Waste Permit            108.8
Issuance

Hazardous Waste                    97.4       51.4       75.4       75.4
Enforcement - Office of
Solid Waste & Emergency
Response                 >

TOTAL WORKYEARS                   206.2       51.4       75.4       75.4
                                      HU-42

-------
                                  HAZARDOUS WASTE


                            Hazardous Waste Enforcement


Budget Request

     The Agency requests a  total  of $3,509,500  for Salaries and Expenses  and  70.1
permanent workyears for 1984, an increase of $1,123,800 from 1983.

Program Description

     This program  serves to ensure compliance  with  the Resource  Conservation  and
Recovery Act (RCRA).  The principle objectives are to  monitor  and  evaluate hazard-
ous waste generator,  transporter,  and facility  compliance  with the  statutory  and
regulatory requirements  of RCRA;  encourage  and  promote voluntary  compliance  by
hazardous waste  handlers;  take  appropriate  administrative,   civil,  and  criminal
enforcement actions when necessary;  and  to  assist  and evaluate program implementa-
tion in the States.

     HazardousWaste Permlt Issuance— This  program  1s  part  of the  comprehensive
effort required by  RCSA  to  manage Hazardous wastes.    The Act  prohibits treatment,
storage, or disposal  of  hazardous waste  except  1n accordance  with  an EPA  or  ap-
proved State  Issued  permit.   Since  1983,   resources  for  this effort have  been
requested in the  Hazardous Waste  Management Regulatory Strategies  Implementation
program.

     Hazardous Waste Enforcement —  Pursuant to  RCRA §3006,   States  may  receive
authorization to  operate and  enforce a  hazardous waste  program  In  Heu  of  the
Federal RCRA Subtitle  C  regulatory program.  States  which lack authorization  may
enter into  Cooperative  Arrangements with  the Agency  to conduct  some  portions  of
the program.  Where States do not  implement this  program,  the Agency  1s  required
to operate  and  enforce  the Federal  regulatory program.   Specific  activities  in
all Instances  Include compliance  monitoring of  interim status  facilities,  per-
mitted facilities,  and hazardous  waste generators and enforcing against  violators
of RCRA or  its  regulations.  The Agency's  strategy  establishes a  balance  between
the promotion of  voluntary  compliance and the discovery and remedy of violations.

     The Agency  is also  responsible  for  evaluating  programs in authorized  and
Cooperative Arrangement  States  to assess  their  progress 1n conducting their  haz-
ardous waste compliance  monitoring  and  enforcement  activities.   This 1s done  to
ensure national  consistency  and equivalence to  RCRA  statutory and regulatory  re-
quirements.

HAZARDOUS WASTEPERMITISSUANCE

1984Program Request

     In 1984, the Agency is  requesting  resources for  the  hazardous  waste  permit
program under the  Hazardous  Waste Management Regulatory Strategies  Implementation
and Regulations, Guidelines, and Policies program elements.

1983 Program

     In 1983, the  Regional  program resources and functions were combined  with  the
Hazardous Waste  Management Regulatory  Strategies Implementation  program.   Head-
quarters resources  and  functions were combined  with the Regulations,  Guidelines,
and Policies program.
                                       HW-43

-------
 1983 Explanation of Changes from Budget Estimate

      There was no change to this program.

 198Z Accompli shments

      In 1982, the  Agency  obligated  $3,191,500 for  this program  in  the  Salaries
 and Expenses appropriation.

      The program emphasized the review and  approval of State submissions for author-
 ization under RCRA §3006.   The  Agency continued development and  implementation  of
 the strategy  to  provide program  development  support to the  States  and  Regional
 offices.  As part of that process, a series of workshops were held to  provide State
 and Regional personnel  with guidance  on hazardous  waste facility  permitting policy
 and procedures.  The Agency processed permits  for  those  facilities that voluntarily
 submitted permit applications.   Teams of experts were established to assist Regional
 and State permit writers in drafting RCRA permits.

           WASTE ENFORCEMENT
 1984 Program Request

      The Agency requests  a  total of  53,509,500 and  70.1  permanent workyears  for
•this program for Salaries and Expenses.  This  represents an  increase  of $1,123,800
 over 1983 to provide for  more extensive travel to support State  oversight  activi-
 ties, a national system of automated reporting of State enforcement data, and higher
 salary costs.  This level reflects  Regional  technical enforcement  resources  only.

      The 1984 Hazardous  Waste Enforcement Program reflects the growing  role of  the
 States in implementing the program  as  well  as the increasing number of facilities
 receiving Federally issued permits.   Although 50 States/Territories are expected to
 have some level of authorization in  1984,  three will  not be participating  while
 three others will  be operating  under  Cooperative  Arrangements.   As  a result  of
 the Federal   role   in  Cooperative  Arrangement  and  non-participating   States,  the
 Agency will  be  required  to  conduct approximately three  percent  of the nationwide
 compliance monitoring and enforcement  program  for  generators  and interim  status
 facilities.   The highest  priority  for  compliance monitoring  inspections is  given
 to facilities  required to comply  with ground  water  monitoring  requirements,  in-
 cinerators,  and  selected generators   and  transporters  because  their  operations
 potentially  pose the most significant threats  to public  health  and  the  environ-
 ment.

      This request  will  enable the Agency to  complete 292 Federal  compliance  inspec-
 tions.  This total  represents the Federal share  of  the national  inspection  program
 which calls  for inspections at  100  percent  of the major hazardous waste handlers,
 25 percent of non-major  interim  status facilities and 10  percent  of the remaining
 generators.   This  level   of  effort  represents  a  strong and  firm commitment to  an
 effective enforcement strategy.   The   Agency  will  conduce an  additional   793  in-
 spections to monitor  compliance  of all  facilities  receiving  Federal  permits  in
 1983 to ensure  they are  complying with  their permit  conditions.

      In the  event inspections reveal violations,  the  Agency will  issue RCRA §3008
 Compliance Orders,   RCRA  §3013   Administrative  Orders  requiring  monitoring  and
 analysis of  sites  which  nay present  a substantial  threat to human health  or  the
 environment, and RCRA §7003 Administrative  Orders to  handlers posing  imminent  and
 substantial  endangerment.   In  addition,  the  Agency  will  develop the  technical
 aspects of civil and criminal actions under the authority  of  RCRA §§7003 and 3008.

      As part of State evaluation  efforts, the Agency will  conduct  487  joint over-
 sight inspections   with  State personnel  and review the compliance monitoring  and
 enforcement  programs in  all   authorized  and  Cooperative  Arrangement   States.   In

-------
addition, the Agency will  support  State enforcement actions  by providing technical
support, such  as  expert  witnesses,  sampling  and  laboratory  analysis, and  other
technical expertise not normally found in State governments.

1983 Program

     In  1983, the Agency  is  allocating $2,385,700 and  70.1  permanent  workyears  to
this program, all  for  Salaries and  Expenses.   This level  reflects  only technical
enforcement resources in the Regions.

     The 1983 program will  reflect  the increase in both permitting  activities  and
the role of  States  In  conducting their programs.   As more  States  are authorized,
the Agency role  will' shift  away  from  implementation  of compliance  monitoring  and
enforcement prog'rams and will focus  on  State  oversight  activities.   Because of the
close scrutiny born by  facilities  applying for permits in 1983, compliance monitor*
ing inspections will- not  be conducted  at those  facilities.   However, in  States
without authorization,  the  Agency will  conduct compliance  nonitoring  inspections
of 100  percent  of designated major  handlers, 25  percent  of other  interim status
facilities, and 10 percent  of  selected generators and transporters  for a  total  of
688 inspections.  To  return violators  to compliance,, the  Agency will  issue  RCRA
§3008 Compliance Orders,  RCRA §3013  monitoring  and analysis  Administrative Orders,
and, where practices present an  imminent and substantial  endangernient, RCRA §7003
Administrative Orders.   Technical  support  for the  development  of  civil  actions and
criminal investigations will be provided.

     In its  State  oversight role, the  Agency will  conduct  487  joint  inspections
with State personnel.  Technical  support  in the  areas of expert witnesses, labora-
tory and sampling support,  and  other technical  expertise will  continue to be pro-
vided.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$489,200 results from the following actions:

     -Congressional  Action.  (+$637,500)  This  increase  includes +$637,500 of  the
$10.5 million Salaries  and Expenses  add-on which supports the 480 additional perma-
nent full-time workyears provided  to the Agency.

     -Rep r og ramnH figs.  (-$148,300)   During  the  development of  the  operating plan,
savera1 reprogrammings  were  made  to this  activity which are  not  reportable under
the Congressional   reprogramming   limitations.   These  changes   resulted in  a  net
decrease of -$148,300 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982, the Agency obligated $3,515,500 for this program, of which $3,136,800
was for  Salaries  and Expenses and  $378,700 was  for  Abatement,  Control,  and  Com-
pliance.  This  level  reflected the  combined legal  and technical enforcement  re-
sources 1n Headquarters and the Regions,

     The Agency focused  on  compliance monitoring  and enforcement program  develop-
ment as  well  as  interim status compliance  Inspections  and  appropriate enforcement
actions.  The Agency conducted  compliance monitoring inspections  of those hazard-
ous waste handlers  whose operations  potentially  pose the most significant threat
to public  health  and  the  environment.   Mhen  warranted,  RCRA §3008 Compliance
Orders, RCRA §3013 monitoring  and analysis  Administrative Orders,  and RCRA §7003
Administrative Orders were Issued.

     In support of authorized States, the Agency monitored and evaluated the imple-
mentation of State compliance monitoring and enforcement programs.  In addition, the
Agency provided technical assistance  in  such  areas as expert witnesses, laboratory
and sampling support, and other technical expertise.
                                      HH-45

-------
Page Intentionally Blank

-------
Pesticides
   SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
PESTICIDES                                                                  P-l

    RESEARCH * DEVELOPMENT
       Pesticides Research	.'	   P-7
    ABATEMENT S CONTROL
       Registration, Special Registration & Tolerances,....	   P-20
          Registration	   P-22
          Special Registration	,	   P-24
          To! erances	   P-25
       Generic Chemical  Review & Special Reviews - EIS Preparation	   P-27
          Generic Chemical Review	   P-29
          Special Reviews - EIS Preparation	,	   P-31
       Federal & State Program Support,	   .P-33
          Pesticides Use Management...	   P-34
    ENFORCEMENT
       Pestidices Enforcement...	•	   P-36
          Pesticides Enforcement	,	   P-37
          Pesticides Enforcement Grants	   P-39
          Pesticides Certification & Training	,	   P-40
                                        P-l

-------
                                      PESTICIDES

                                ACTUAL   BUDGET
                                 1982    ESTIMATE
                                           1983
                      CURRENT   ESTIMATE   INCREASE  +
                      ESTIMATE     1984    DECREASE  -
                        1983             1984 VS  1983
APPROPRIATION
                                (DOLLARS  IN  THOUSANDS)
 Salaries & Expenses
 Abatement Control  &
 Compl iance
 Research 4 Development

TOTAL,  Pesticides
531,168.0  $28,139.4  $28,501.0  $31:,435.2   $2,934.2
$24,410.9  $20,534.4  $22,318.9  519,634.4  -52,684.5

 52,234.7   52,108.2   52,108.2   51,673.0    -S435.2

$57,813.6  550,782.0  552,928.1  552,742.6    -S185.5
PERMANENT WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
    765.3      660.9      662.2      652.7        -9.5
    828.3      744.5      745.8      736.9        -8.9
$61,435.0  557,244.4  553,074.0  553,430.0     +S356.0
                                        P-2

-------
                                     PESTICIDES


DVERVIEVIAMD STRATEGY

     In 1981, nearly 1.2  billion  pounds  of pesticide active  Ingredients  -  roughly
one quarter of the world's total  -  were  used  in  the  United  States.  These products
create major  social  benefits,  such  as  increased agricultural  productivity,  lower
domestic food prices, a more  favorable  balance of nayments due  to  increased  agri-
cultural exports, and control  of human and animal diseases  spread  by  insects  and
rodents.  However, pesticides  are designed to  be "bioactive  and  are  deliberately
introduced into  the  environment  for that purpose.    Furthermore,  most  of  these
products are  used on  human  or  animal   food  crops,  making   some  human  exposure
unavoidable.

     The Environmental  Protection Agency  regulates the  use  of pesticides  under the
Federal Insecticide,  Fungicide,  and Rodenticide  Act  (FIFRA)  as amended, and  Sec-
tions 402, 406,  408, and  409  of the Federal Food, Drug, and  Cosmetic  Act (FFDCA).
FIFRA authorizes the Agency, through a  variety of mechanisms,  to  achieve the  goal
of ensuring  that pesticides  registered   for  sale and  use  in  the  United  States
will  achieve their intended function  without  unreasonable  adverse  effects on  human
health and environmental  quality.

     Overall, the Agency's  efforts   focus  on  three  broad program  areas  to  achieve
environmental results.   These  programs  include  registration   of new products  and
review and reregistration of existing pesticide  products;  enforcement  of pesticide
use rules; and research  and development to reinforce  the Agency's ability to evalu-
ate risks  and  benefits   of  pesticides.    Several  areas  of  emphasis  are  evident
throughout these  programs that  reflect the continued  importance of  improving  the
review processes in the  pesticides regulatory  program.

Registrajtion Activities

     FIFRA and  FFDCA provide  for  Agency  control   of  the   terms  and  conditions
under which pesticides can  be legally used through  the issuance  of registrations
to permit marketing  of  pesticide products  or  their  use under  special  conditions.
Registration standards  are  being  established  by the  Agency  to  facilitate  pes-
ticide registrations  and  ^registrations  as  expeditiously  as possible,  in  accor-
dance with the FIFRA  mandate.

     Special  Reviews  (formerly Rebuttable  Presumption Against Registration  -  RPAR)
are conducted  on pesticides  which  have  triggered  established  risk criteria  and
thus are suspected of causing unreasonable adverse health or environmental effects.

Pesti ci des Enforcement

     The pesticide enforcement program monitors  and enforces  compliance  with  FIFRA
requirements largely  through  cooperative   agreements  with State  and  Territorial
agencies, to which the Agency provides enforcement grants.   Compliance and enforce-
ment activities  are mainly intended  to ensure  that pesticide  users  comply with the
label directions and  that pesticide producers  and sellers comply with registration,
classification, and labeling requirements.  The  Agency also  provides funds  to  the
U.S.  Department  of Agriculture  (USDA)  to  help support  training  for  applicators of
restricted use pesticides, primarily farmers, and grants to States and Territories
to defray the costs of certifying applicators.

Research and Development

     EPA's pesticides research  program  is designed  to establish  and  maintain  a
sound scientific  basis  for  pesticide compliance  and  registration  activities.   The
program's focus  is on increasing  our understanding of how  pesticides interact with
                                        P-3

-------
man's activities in  the environment  to  a degree that will  ensure that the  regu-
latory process  will  maximize  oest  control  and  minimize  adverse  damage to  human
health.and  the  environment.   The   research  effort  will   reduce  uncertainties  in
regulatory decisions and  will  improve the  quality  of .exposure,  hazard, and  risk
assessments.

Pro a ram Imp rpveme nts Conti mie

     In 1984, the Agency  will  continue  to reap the benefits of  regulatory  reforms
initiated in 1982.   These include:   maintenance of backlogs at or  near zero in the
registration, special   registration  and  tolerance programs;  the  reduction  of  time
and effort  required  to review registration applications,  special  registration re-
quests, and  tolerance  petitions;  and Improvement  in both  the  quality  of  science
used in reviews and in the efficiency of  these reviews  to  achieve  sound and timely
scientific judgments on FIFRA  issues.  This  will  result in reduced costs  for  both
the Agency and the  industry.

     In addition to  fees  already collected  for  tolerance  setting,  EPA will  seek
to assess  fees  for direct Agency services  provided  to  registrants in  registering
pesticides.  This would  cover registration activities  on  new chemicals,  new  bio-
rational s, old  chemicals,  amended   registrations  and  experimental  use  permits.
These fees  could  go directly to the  U.S.  Treasury  and  consequently would  have no
impact on EPA budget needs.

     Exempting selected  types  of pesticide  products or  chemicals  from the  full
anplication of  FIFRA   regulations will  be  emphasized,  wherever  possible,  on the
basis of adequate public  health  protection.   Examples include minor use and  rela-
tively safe pesticides.

     An improved working  relationship with  the industry  will  be  maintained through
increased consultation with  registrants  and applicants during the review processes,
early screening of data to  identify problems  for timely  resolution,  greater effort
to achieve negotiated  settlements rather  than the  use of  rigid  administrative ap-
proaches with respect  to  pesticides  suspected of  posing  unreasonable  risks, and
closer industry involvement  in the  development of registration  standards  guidance
packages.  These actions will cut time and costs  to EPA  and producers.

     In the  establishment  of  registration  standards, early  review of pesticides
characterized by high  volume production,  high exposure, and high  potential  hazard
will be  ensured through  continued  use  of  the  clustering  and  ranking  strategy.

     Streamlined review processes will  be maintained to obtain:  (1)  strict adher-
ence to statutory and administrative deadlines; (2)  improved monitoring of decision
processes; (3) more efficient  reviews of  clusters  of chemicals  with  similar  uses;
(4) elimination of  non-essential reviews;  (5)  reduced scope and  increased  selecti-
vity of literature  searches; (6) greater  use  of  high  quality  reviews made  by  other
United .States and  foreign oroanizations;  and, (7)  revised  criteria  for triggering
special reviews to  reflect likely risk more closely.
                                        p_4

-------
                                       PESTICIDES
Program Activities
                             Actual
                              1982
Registration standards
 guidance packages
 established	,.         18
Special Review
 {formerly RPAR)
  decisions..	         16
Laboratory data audits...        13
New chemical and biora-
 tional reviews	       221
Old chemical reviews....     11,993
Amended registration
 reviews		!/         23,727
New use reviews....	
Emergency exemption
 revi ews	       752
Experimental use permit
 revi ews	      499
24(c) State registration
 reviews.	     1,656
Temporary tolerance
 petitions..	      167
5(f) State experimental use
 permit reviews
Tolerance petition  reviews..    599
Inert ingredient
 request reviews.	       58
Producer establishment
 inspections	-....!'     2,604
Use/reentry and
 experimental  use
 observations	 ...*/    14,264
Market place inspections..$/ 16,091
Import inspections	*./       489
State applicator license
 and record inspections..    14,005
State dealer record
 inspections,	    11,967
Federal laboratory
 inspections..	        1.3
Budget
Estimate
  1983
     15
      6
     18

    130
  6,000

 18,000
    400

    490

  1,100

    140


    400

     35

  2,285


  9,221
  6,326
     80

  9,530

  6,049

     40
Current
Estimate
 1983
     22
     13
     18
Estimate
 1984
                                                                    35
                                                                    10
                                                                    18
    250        250
  8.500!/    8..5001/

 20.3001/   20,300V
               150l/
    770

    475

  1,100

    175
    100

    640

     50

  2,863


 11,538
  7,915
     80

 11,912

  7,561

     40
                                                                   770

                                                                   475

                                                                 1,100

                                                                   175
                                                                   100

                                                                   640

                                                                    50

                                                                 2,360


                                                                 9,344
                                                                 6,402
                                                                    80

                                                                 9,530

                                                                 6,049

                                                                    40
Increase +
Decrease -
1984 vs. 1983
              +  13
              -  503
              -2,194
              -1,513
              -2,382

              -1,512
I/  1983 and 1984 outputs, compared with 1982 outputs, reflect a reduction in the
~   average number of reviews per chemical and the elimination of the backlog.

2f  Amended registration reviews include amendments to current pesticide labels,
    administrative amendments, and supplemental registrations.

37  Included in earlier years under Old Chemical Reviews and Amended Registration
    Reviews.

4/  Includes both Federal and State enforcement activities.
                                        P-5

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY



                               1984 Budget Estimate
                                                              I


                                Table of Contents





                                                                            Page



PESTICIDES



    RESEARCH « DEVELOPMENT

       Pesticides Research	 .•	   P-7
                                       P-6

-------
                                     PESTICIDES
                                 Pesticides Research

ACTUAL
1982
BUDGET
ESTIMATE
1983
CURRENT ESTIMATE INCREASE +
ESTIMATE 1984 DECREASE -
1983 1984 VS 1983
(DOLLARS IN THOUSANDS)
PROGRAM
Scientific Assessment
Salaries I Expenses
Research & Development
TOTAL
Technical Information &
Liaison
Salaries & Expenses
TOTAL
Monitoring Systems 4
Qual ity Assurance
Salaries 4 Expenses
Research 4 Development
TOTAL
Health Effects
Salaries 4 Expenses
Research 4 Development
TOTAL
Environmental Processes
& Effects
Salaries 4 Expenses
Research & Development
TOTAL
TOTAL:
Salaries 4 Expenses
Research 4 Development
Pesticides Research 'TOTAL
PERMANENT WORKYEARS
Scientific Assessment
Monitoring Systems 4
Quality Assurance
Health Effects
Environmental Processes
$313. 6
$9.9
$323.5
$59.7
$59,7
$519.2
$51.2
$570.4
$1,691.5
$308.0
$1,999.5
$2,293.0
$1,865.6
$4,158.6
$4,877.0
$2,234.7
$7,111.7
5.6
6.6
28.0
45.6
$264.0
$15.5
$279.5 '
$21.2
$21.2
$484.5
$235.0
$719.5
$1,260.0
$1,240.9
$2,500.9"
$2,330.9
$616.8
$2,947.7
$4,360.6
$2,108.2
$6,468.8
4.5
6.0
17.0
44.2
$337.1
$15.5
$352.6

$484.5
$235.0
$719.5
$1,260.0
$1,240.9
$2,500.9
$2,330.9
$616.8
$2,947.7
$4,412.5
$2,108.2
$6,520.7
6.7
6.0
17.0
4.3,8
$382.9
$27.5
$410.4

$470.9
$408 .0
$878.9
$1,389.0
$1,049.3
$2,438.3
$2,146.8
$188.2
$2,335.0
$4,389.6
$1,673.0
$6,062.6
6.7
7.0
18.7
38.3
$45.8
$12.0
$57 .8

-$13.6
$173.0
$159.4
$129.0
-$191.6
-$62.6
-$184.1
-$428. 6
-$612.7
-$22.9
-$435.2
-$458.1

1.0
1.7
-5.5
4 Effects
TOTAL PERMANENT WORKYEARS
85.8
71.7
73.5
70.7
-2.8
                                          P-7

-------
« Effects

TOTAL WORKYEARS
                                      PESTICIDES

                                 Pesticides Research

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE •+
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

TOTAL WORKYEARS
Scientific Assessment
Technical Information 4
Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Processes
(DOLLARS U

8.5
1.6
7.7
36.1
62.8
i THOUSANDS)

5.5 7.7 7.7

7.1 7.1 8.1 1.0
29.2 29.2 31.2 2.0
61.5 61.1 55.3 -5.8
116.7
103.3
105.1
102.3
-2.8
                                         P-8

-------
                                      PESTICIDES


                                  Pesticides Research

                                                          Current
                                         Actual           Estimate         Estimate
Major Outputs/Milestones                  1982             1983             1984

Define the Environmental and Health
Endpoints of Pesticides to Determine
Possible Future Test Method Development

-  Report on viral effects on immune       9/83             9/84             9/84
   responses in mammalian cells (Health)

Develop and Validate Test Methods
That Identify Health and Environ-
mental Effects of Pesticides for
the FIFRA Registration and Enforce-
ment Programs

-  Report on improved and validated                        10/85            10/85
   methodology for measurement of
   human exposure (Health)

-  Report on biological control            9/82            12/85            12/85
   agent testing procedures
   (Env. Processes)

-  Report on field studies to assess                        9/84             9/84
   pesticide effects on wildlife
   (Env, Processes)

Develop Methodologies That Improve
the Agency's Risk Assessment
Capability under FIFRA

-  Report on pesticide accumulation                        11/84            11/84
   by selected aquatic animals in
   the field (Env. Processes)

Develop and Validate Techniques That
Assess Human and Environmental
Exposure to Pesticides for FIFRA
Registration and Enforcement Program

-  Final report on acute toxicity                           9/83
   of 14 granular pesticides to
   avian species (Env. Processes)

Conduct and Review Risk Assessments in
Support of FIFRA Decision-Making

-  Provide human health related risk       9/82             9/83             9/84
   assessments (Scientific Assessment)
                                        P-9

-------
                                      PESTICIDES


                                  Pesticides Research
                                                          Current
                                         Actual           Estimate         Estimate
                                          1.982             1983             1984
Provide Quality Assurance Assistance
and Support for the Pesticides Reposi-
tory Program, Regional /State Labora-
tories and other FIFRA Activities

-  Provide high purity chemicals           9/82             9/83             9/84
   and comparison samples
   (Monitoring 5

-  Report on the effects                   6/84             6/84             6/84
   of toxic exposure during selected
   critical development periods on
   sexual  dimorphisms (Health)
                                         P-10

-------
                                     PESTICIDES


                                Pesticides Research
     The Agency  requests  a total  of $6,062,600 and  70.7 permanent  workyears  for
1984, a  decrease  of $458,100 and  of 2,8 permanent workyears  from  1983.   Included
in this  total  is  54,389,600 for Salaries and Expenses  and  $1,573,000 for Research
and Development, with decreases  of  522,900 and $435,200, respectively.   The decrease
primarily occurs  in the environmental processes and  effects program  element.   In
addition:, the  decrease  reflects the  transfer of $280,000 in  exploratory research
funds to the Intermedia program.

Program Description

     The Envionniental Protection  Agency is  required  by  the  Federal  Insecticide,
Fungicide and  Rodenticide  Act (FIFRA) and the .Federal  Food,  Drug and  Cosmetics Act
(FFDCA) to  regulate the use of pesticides  in  a manner  which  will  not  result  in
unreasonable adverse  effects  to  the public  health  and  to  the  environment.   The
pesticides research  focuses on increasing  our  understanding  of  how  pesticides
interact with  man's activities  and  the  environment,  to assure  that  their  use  can
minimize damage from pests, while maximizing the protection of man's food and fiber
and the environment from unreasonable adverse effects.  An  understanding of pesti-
cides effects  and  their proper usage will  lead to less  burdensome and  more  cost
effective regulations.

     Objective^ 1 .    Define the  Environmental  and  Heal th Endpoints  of Pesticides
to Determine Possible Future Test Method Development^' Tne1 purpose of this 'oSjective
is to iden'ti'fy' tftV'JtoiTc'efTeVti"W'''pVstfcTd₯s~wi'th which the Agency should concern
itself.  The current  approach   of  this  research is two-fold:   (1)  to determine  if
there are toxic effects (i.e.,  endpoints)  that  we  should be  concerned  about  that
occur as a  result  of  the  use  of  biological  pesticides; and  (2)  to examine  how
pesticides affect  children,  as developing   organisms,   differently   from  adults.
Once the appropriate  effects of concern are identified  in these  areas,  research
results can be utilized to determine likely candidates for test method development.

     Objective 2.   Develop  and  Validate  Test  Methods That Identify Health   and
Environmental   Effects of  J^sticiQ'es  for the FIFRA ^ Registration  and Enforcement
frrograitis.  This 'research "effort ............ will  supply ' ;ivaTi dated 'environmental and  health
assay methods  for use  by  industry.  Research  under this  objective   is  needed  to
develop valid  test  protocols  to meet pesticide  registration requirements  and  en-
forcement responsibilities under Sections 3 and  26 of FIFRA.

     Objective 3.   Develop  and Validate Techniques That Assess Human and Environ-
mentaT~Exposure  to' Pesticides  for the FIFRA Regi strati oh and Enforcement Progranu
Health research will find a suitable animal  model and conduct related  field studies
for developing exposure data to be .used for  setting field  re-entry  standards  for
susceptible populations.   This  research will help  determine the conditions  under
which the young,  elderly,  pregnant,  and. malnourished may  be more susceptible  to
toxicant exposure than the general  population, and will enable the Office of Pesti-
cide Programs  to  set  re-entry  intervals  to protect  susceptible populations  for
certain classes of pesticides on treated fields  and premises.  In the  environmental
area, research develops field   validated exposure  assessment models  to  define  the
concentration of  pesticides  for use  by  OPP  in  anticipating pesticide  impacts  in
populations.  These models simplify the data  gathering  requirements imposed  on
industry in order to register pesticides.
                                         p-n

-------
     Objective 4.  Peyelop  Hethodologles That^ Impj-ovejthe Agency's Ri'5_k Asse_ssftient
Capabi1 i ty Under FiKRA.  f hi s  activity  developsarid"validates  7ie5  or  improves
envi ronmental and  public health  risk  assessment  methods.   The   risk  assessments
methods represent  an improved  capability  for  the  Office  of Pesticide  Programs
(OPP) to  analyze and aggregate  the data  submitted  by  the pesticide  industry  to
determine the risks  and  benefits  resulting  from pesticide usage-   This  research is
essential for reviewing  and evaluating  data  to determine whether a  pesticide  can
be used  without reasonable  adverse risk  to public  health  and   the  environment,
pursuant to Sections 3, 4, 5, and 24 of FIFRA.

     Objective5.    ConductandReview  Risk  Assessmentsin  Supportof  FIFRA
Dec1siW_Majlng.This  research   prepares  human health   related   rt$K  assessments
for carcinogenic,  mutagenic,  and/or  reproductive  effects  of candidate  pesticide
products.  This work will assist in  identifying research priorities and in designing
research initiatives to  support data and methodological  needs that become apparent
as a result of the conduct of the risk assessment program.  The guidelines proposed
in 1981 for assessment of mutagenic  risk will  also  be revised, taking into account
public comments.  The  cancer guidelines will  be  updated  to  consider mutagenicity
for selecting appropriate  models  for  cancer  risk evaluations  and  work will  be
initiated to develop guidelines for reproductive effects, including teratogenid" ty
and male and female  infertility.

     Objective 6.   Provide  Quality  Assurance  Assistance  and  Support  for  the
Pesticjdes_~ygepo^ftbry  Program,  Regional/State  laboratories,   ancl  Other  FIFRA
ActivttfieT!   The activity' maintains a repository of high  purity   chemicals  tfiat"
serves as standards  for  internal  quality control to ensure that data  in  support of
pesticides registration  is  accurate,  precise  and   reliable.    In  addition,  the
program provides  quality assurance  support  to  the  Office of Pesticide  Programs
contract laboratories in their analytical  efforts.   The  latter task  is  to provide
specific quality  control  chemicals  and unknown  samples  to  laboratories  for  the
purpose of ensuring  that their analyses  are  conducted  and reported at the required
level of precision and accuracy.

SCIENTIFIC ASSESSMENT

1984 Program Request

     The Agency  requests a  total  of 3410,400 and 6.7  permanent workyears for this
program, of which 5382,900 is for Salaries and Expenses and 327,500 is for Research
and Development.  This  reflects   increases  of  545,800  and 312,000,  respectively,
which will enhance  support  required to  prepare health  risk assessments  needed  by
the Office of Pesticide Programs.

     Conduct  and  ReviewRiskAssessments In Support  of^ FIFRApecision-Haking
Responsibilities.  Tn  1964,  fRe  Sciehtifie 'AssessmenT Wo'gram  will  provide  the
following outputs  for  use  by  the Office  of Pesticide  Programs:   cardnogenicity
and mutagenicity risk  assessments;  adverse  reproductive  effects  risk  assessments;
and exposure assessments.  The Scientific  Assessment program will  review  and then
defend these assessments  before  the Agency's  Science  Advisory Panel and  in legal
proceedings.  The program will also revise and update  risk assessment  guidelines.

1983Program

     In 1983, the  Agency is allocating  a  total of $352,600  and   6.7 workyears  to
this program, of which  $337,100 1s under  the Salaries  and Expenses  appropriation-and
$15,500 is for extramural purposes under  the Research and Development appropriation.

     Conduct  andReviewRisk  Assessments  In Support of FIFRA   Decision-Making.
In 1983, the program will continue  to  provide healthi ami  'risk  assessments  for car-
cinogenicity, mutagenicity  and adverse  reproductive  effects of  those  chemicals
identified by the  Office of  Pesticide  Programs.   Exposure assessment  guidelines
will  be completed.  Assessments will be  defended before  the Agency's  Science Advi-
sory Panel.
                                          P-12

-------
1983 ExpJanation of Changes from Bjjd_get_Estiniate_

     The net increase of +573,100 results from the following action:

     -Congressiona 1 Action.  (+573,100)   This increase  includes  +573,100 .of  the
$10.5 mi 11ioni".Salaries'  and  Expenses add-on which supports  the  480 additional  per-
manent full-time workyears provided to the Agency.

1982 Accpmplishments

     In  1982. the  Agency  obligated  a total of 5323,500  for this program,  of which
5313,600 was under the Salaries and  Expenses appropriation and $9,900 was for extra-
mural purposes under the Research and Development appropriation.

     Conduct  and  Review Risk Assessments in .Support of flFRA^Decision-Making.  In
1982 accompl ishments Included  the  preparation of heal th documents'on  Irhdane, i n-
organic  arsenic,  ethylene  dlbromide,  chloroform  and  carbon  tetrachloride  for
mutagenic and  carcinogenic risk  assessments;  review of  documents on  estimating
pesticide exposure  from air  blast  application;  development  of  draft  guidelines
for the  preparation of exposure assessments; and a handbook for performing exposure
assessments.

TECHNICALINFORMATIONAND LIAISON

1982 Accompli shments

     In  1982, the  Agency obligated a total  of  559,700 for  this  program,  all  of
which was  under the  Salaries   and  Expenses  appropriation.   This  activity,  which
supports research programs  across  all media, was consolidated into the Intermedia
program -in 1983.  Thus,  the   Progj-am De;sc_rjp ti on,   198j Program^ Re..quest.,   1983
Program and 1982 Accomplishments narrative sections appear there.  '

MONITORING SYSTEMS ANDI OUAIITY ASSURANCE

1984 Program Request

     The Agency requests a  total  of 5878,900 and  7.0 permanent workyears for this
program, of which  $470,900  is  for  Salaries and  Expenses  and 5408,000  is  for Re-
search and  Development.   This   reflects  .a decrease of 513,600  and an  increase  of
5173,000, respectively.  This  net  increase  represents an expanded custom synthesis
effort to provide  pesticide chemicals  no longer  commercially  available  from any
source in the United  States.   These chemicals are required  for sensitive and con-
firmatory analyses  of  pesticide  content  in  soil,  plant  and   animal  tissues.

     Provide  Qual i ty Assurance ^Assistance and Support for the Pesticide Reposi'tory
Program, "RegTonal/State  Labgrato'rTes and  Other FIFRA  Activities^This program
tnaintains the .Pesticide Repository  of  nigh  purity  cnemicais whicn are used by over
1,400 laboratories in  the  United  States  and  foreign  countries.   These  are used  as
standard analytical reference  samples  for internal quality control to  ensure that
test data  is  accurate,  precise and   reproducible.   In  addition, interlaboratory
comparison samples are  prepared and used to assist contractor  laboratories  of the
Office of Pesticide Programs in their analytical' efforts.   An  expanded synthesis
program will be initiated to prepare various  chemicals which  were  once produced in
the United States, which  are  no longer produced,  but which are  still  regulated  by
the Environmental  Protection Agency  and  other Federal agencies such as the Depart-
ment of  Agriculture  and the Food  and Drug Administration.   For  example,  DDT'and
its degradation products  are  Often  found  in  small amounts  in  soils or animal  or
plant tissue.  Without authentic reference  samples  for comparison, it is difficult
or even  impossible  to  perform analyses   of the  required  degree  of  accuracy.
                                          P-13

-------
 1983 Program

     In 1983, the  Agency  is allocating  a  total  of $719,500 and 6.0 permanent work-
years for this program, of  which $484,500 is under the Salaries and Expenses appro-
 priation and  $235,000 for  extramural purposes  under the  Research  and Development
appropriation.

     Provide  Duality Assurance Assistance and .Support for the Pesticide Repository
Program, Regional /State  ^Laboratories an<[ Other• FiFRA Activities^.   !7i  1983, this
program will mairitaTn the  Pesticide qua Hty  assurance activTties  in support of  the
Federal Insecticide,  Fungicide,  and Rodenticide  Act (FIFRA)  registration  and  en-
 forcement.  The  funds  will  be  used  to   support the  pesticide repository  which
distributes standard  analytical   reference  samples  to  Environmental  Protection
Agency and  other  Federal  laboratories  as  well  as  State,  local, .university  and
 industrial laboratories.  The major  activity of the  repository is the distribution
of over  28,000  samples to  over  1,400  laboratories.   These  chemicals  are used  for
internal .quality control  purposes  to ensure  that their  data are accurate,  precise
and reproducible.   In addition,  interlaboratory comparison samples  are prepared
and distributed to the Office of Pesticide Program's contract laboratories  for use
 in their .analytical work.

 1983 Explanation of Changes from Budget Estimate

     There were no changes  to this program.

1982 Ace ompl f sjinients

     In 1982, the  Agency  obligated .a total  of  $570,400  for this program, of which
5519,200 was  under the  Salaries  and Expenses  appropriation  and 551,200 was  for
extramural purposes under the Research and Development appropriation,

     Provide Quality Assurance Assistance and Support for^jthe^Pesticides Repository
Program, gegionaI/State  Laboratories and pfhern^deraITJhsectfcide ,'^ungicide,'" jj/Td
FTF8A""Al:tTvi ties.  During I9K7 tn'Ts program continueo11'quality'assurance activities
in support  of  FIFRA  regulatory decisions  and  enforcement.   A major  part  of this
effort was  the  maintenance  of the  pesticide  repository of  chemicals  which  are
materials used  by  over  1,400 EPA,  other Federal,  State,  local, university  and
industrial laboratories.

HEAUH EFFECTS

1984 Program Request

     The Agency  requests  a  total  of 52,438,300  and 18.7 permanent workyears  for
this program, of  which 51,389,000 is for  Salaries  and  Expenses  and  SI,049,300  is
for Research and Development.  This reflects  an increase of  5129,000 and a decrease
of 5191,600, respectively.   The  increase  will  expand  the  in-house capability  to
develop methods to  extrapolate  data from  animal  test systems to humans.   The  de-
crease in extramural funds results from a reduction  In methods development research
and the shift in emphasis to validation of these methods and a transfer of explora-
tory research funds to the Intermedia program.

     Define the  Environmental .and  Health  Endpoints of Pesticides That  Determine
Possible FutureTest Method  Developroent.This  work  will  continue to  define  the
critical pubTichealth  effects  pertaining  to biological  pesticides.   Accordingly,
we will  provide  data  on  the  immune!ogical   effects of  biological  pesticides  on
mammal 1,an cells.    Additionally,  although  human health  effects are generally  well
defined for adults, more  research  is needed  for developing effects information  for
children.   This work  is  required  to safeguard  public  health under Sections  3,  4,
5 and 24 of FIFRA.
                                         P-14

-------
     Develop and  Validate Test Methods That  Identify Health and Environmental Ef-
fects of Pesticides for FIFRA Registration and Enforcement Programs.  This research
effo-rt wTI 1 Continue  to  supply  validated health assay methods  for industry  to use
to produce a reliable  data base that  OPP  can  use  to estimate  the  risk  to humans.
We will develop  seven additional test  methods  in  the areas  of reproduction/tera-
tology, mutagenesis/ carcinogenicity (genotoxic effects)  and neurotoxicology.   Re-
search under this  objective  is  needed  to develop validated  test protocols to  meet
pesticide registration requirements and enforcement responsibilities under Sections
3 and 26 of FIFRA.

     Develop Methodologies  That  Improve the Agency's Risk Assessment CapabU i ties
Under FIFRA.  The 1984 program will" improve ^methods that assess  exposure of children
to pesticides that  have  been applied  in  fields.   He will also provide  models for
evaluating human risks to  pesticides on  the  basis  of laboratory studies;  one model
will extrapolate animal data to children.

     Provide Quality Assurance Assistance and Support for the Pesticides Repository
Program, Regional/State Laboratories and Other  FIFRA  Activities.   A computerized
data management  and  analysis system for mutageriic/carci nogenic  testi ng  of  pesti-
cides will continue to be developed.  Development of such a data base will  permit
the timely evaluation of developmental  test  systems for the detection and confirma-
tion of potential  carcinogenicity  and  mutagenicity by making  appropriate correla-
tions and  statistical  analyses.   These  data  will  identify  chemicals  which  are
structurally similar  to  a  known chemical,  thereby  providing  reliable  toxicology
data.

198 1 Program

     In 1983, the  Agency  is  allocating a  total  of  52,500,900  and  17.0 permanent
workyears to this program,  of  which $1,260,000 is  under  the Salaries and Expenses
appropriation and  $1,240,900 is  for  extramural  purposes under the  Research  and
Development appropriation.

     Define  the  Env1 ronmental   and  Heal tn Endpoints of Pestici des That Deternnne
Possible Future ..... Test" Method Devel opiefit,  This wo rk wi 1 )  def i ne the c ri tic a 1  p ub T i c
health effects pertaining  to  biological pesticides.   Also,  human health endpoints
are currently generally  well  defined  for adults,  but additional work is needed for
developing endpoints  for  children.   This  work  is  required  to  safeguard  public
health under Sections 3,  4, 5 and 24 of FIFRA.

     Develop and Validate Test Methods  That  Identify Health and Environmental Ef-
fects of Pesticides  for  _the  FIFRA Registration  and Enforcement Programs:.    This
research Wi'a-r't "wTl TTtfO rk  on vaTi da tea heal th  assay  methods  in the areas of repro-
duction /teratology, mutagenesis/carcinogenesis {genotoxic effects)  and neurotoxi-
cology for  industry  to use  to  produce  a  reliable data  base  that OPP can  use to
estimate the risk to humans.
     Deyelop Hethodol ogies  That  Improve  the  Agency ' s Risk Assessment       -
U nder"Tr FRA.'  Re sea rch i s con t i n u i ng o n me thods that improve the Agency ' s ab i 1 Tty to"
assess human exposure to pesticides.  Research also  continues  to  work on models to
extrapolate animal data to humans.

     Provide Quality  Assurance Assistance; and Support for the Pesticide Repository
P rogram ,  Regi ona 1 /sta te Labora torTes and Other FIFRA, ,Ac tl yi t1 es"     A computerized
data managemeht and^analysis system for mutagenic/carci nogenic testing of pesticides
will be developed.  Development of such  a  data  base will permit the timely evalya-
tion of developmental test  systems for  the detection  and confirmation of potential
carcinogenicity and mutagenicity by making appropriate correlations and statistical
analyses.
                                           P-15

-------
1983 Explanation of Changes from Budget Estimate

     There are no changes to this program.

1982 Accomplisjments

     In 1982, the Agency obligated a total of 31,999,500 for this program, of which
51,691,500 was under  the  Salaries and Expenses appropriation  and  5308,000 was for
extramural purposes under the Research and Development appropriation.

     Develop and  Yalidate  Test Methods  That  Identify  Healtha_ncI Environmental
Effects of Pesticides for the FIFRA Registration amf Enforcement Program.  Research
Support" is prov^Seci'Wthe Office of Pesticide Programs and the	ReglonS^in develop-
ing and validating improved  test protocols for inclusion in the pesticide guidelines
and in  developing  procedures  for extrapolating from animal data  to human effects.

     Develop MethodologiesThatImprovethe  Agency's Risk Assessment Capability
Under FIFRA.  Research worked on  methods  to  improve the Agency's abi1ity to assess
huro₯n exposure to pesticides.  Research also worked on models to extrapolate animal
data to humans,

ENVIRONMENTAL PROCESSES AND EFFECTS

1984ProgramRequest

     The Agency  requests  a  total  of  32,335,000 and  38.3 permanent  workyears for
this program,  of which 32,146,800  is  for Salaries  and Expenses  and  $188,200 for
Research and  Development,   This  reflects  a decrease  of  $184,100  and  5428,600,
respectively, which results  from  an overall  program consolidation;  a reduction in
toxicity testing  and  test method  development to  reflect the  completion  of  some
projects and the shift to  validation  of  these  methods and a  transfer of long-term
exploratory research  resources to the Intermedia program.

     Develop  j ndVal i da te Test Methods That  Iden ti fy  Heal th  and  Envlronmental
Efffictli""'":!^f' |^                                                               This
research willdevelopandvalidate  predictivetechniques  toestimate effects  of
biological control agents and  chemical  pesticides  on biota in  aquatic  and terres-
trial environments.   It  includes  ecosystem  effects,  ecological  functions  and
related processes and .behavioral aspects of non-target organisms within ecosystems.
Environmental effects findings will be validated within the context of mathematical
model development utilizing field work where necessary.

     DevelopMethodolpjfes  That  Improvethe Agency's RiskAssessment CapabilIty
Under FIFRA.  This "activity will'continue "to 'develop andrvalidate new or improved en-
vironmental risk assessment methods for organisms.   Methodologies will be developed
to perform  environmental  risk  assessments  by  integrating  exposure and  effects
information and utilizing data from:  (!)  identified hazards in critical  ecosystems
hazards; (2) validated fate,  exposure, and effects  models; (3) existing methodology
for quantifying  risks; and (4)  other  valid information.   This research  will supply
basic mechanisms  upon  which  predictive  risk  assessments  can  be  established.
Programmatic emphasis will be  upon  use of terrestrial  and  aquatic field validated
data derived from laboratory work, with the data utilized in appropriate mathematical
models.  The Pesticide Environmental  Exposure  Assessment Team (PEEAT)  will provide
technical  support in  the interpretation and conduct of assessments.

     Develop  and  Validate'Techniques tha^ Assess  Human and Environmental Expp|ure
to Pe sticrdes for' the FIFRA^^egTsTra^qn and jnf orcement Program.  TFi  research  in
tlii s~6h j ee fi ve wi 11 c o 'fill n u e  tode vel op a nd va 1 i da te ma them!tleal and other predic-
tive or descriptive  techniques  to estimate  adverse  pesticide exposure  in aquatic
{freshwater and  marine)  and  terrestrial   environments.   Such determinations  will
Include pesticide distribution and exposure levels  in ecosystems and in such physi-
cal habitats  as   soil  and  sediment  chemical   conditions and  sorption  kinetics.
Studies will  also include the field validation of exposure models.
                                          P-16

-------
     Pesticide concentrations,  environmental  placements,  and duration  of exposure
to biota  contribute  incrementally to  the  environmental  change  and  assessment,
Validation of  such  field exposure levels  provides  crucial  information  for regula-
tory hazard and risk assessment processes.

1983 Program

     In 1983,  the  Agency  is  allocating  a  total  of 52,947,700  .and  43.8 permanent
workyears to  this   program,  of which  $2,330,900  is  under  Salaries and Expenses
appropriation and $616,800 is for extramural purposes under the Research and Devel-
opment appropriation,

     Develop  and.  Validate  Test  Methods  That  Identify Health and_E_nv1rohmenta1
Effects  of7 Pesticides'-' forthe ' FTFft'' ftegi strati on  and  Enforcement  Programs.
laboratory and field  vali da tion research  wi 11 be conducted to  assess  the hazards/
effects of pesticides on organisms.  The  research  will  supply mathematical methods
to identify  sensitive  ecosystem stress points, laboratory toxicity  testing  as re-
quired, organism culturing and  bioassay method  improvements,  studies on biological
control agents,  and field  validation  studies in  natural   sites  where pesticide
problems may be most prevalent.

     Develop  Methodologies  That Improve  the Agency's Risk  Assessment Capability
Under FIFRA.Methodologies  wi 11  be improved  to perform  predictive .environmental
risk assessments and to provide direct research support for exposure assessments in
response to  the  regulatory office needs.   This research will  integrate pesticide
fate, exposure, and  effects  information  of pesticide  impacts utilizing (1) labora-
tory research  data, (2)  existing or  new  methodology  for  quantifying  risks  and
(3) information from validated  fate and effect models.  Research under this program
will progress  to field  applicability testing  for  single and  multimedia pesticide
exposure assessment  models  and concurrent  development,  application  and evaluation
of these methods for use in risk assessments.

     Develop  and  Validate Techniques That AssessHumanand Environmental Exposure
to  Pe s ti c ides  for the  FIFRA  Registrati on  and  Enforcement Program.  Predictive
technique's are  being developed,  Improved  and  vatidatedthrough field  studies to
estimate the transport,  exposure  and  fate of  pesticides  in  the marine, freshwater
and terrestrial environments.   This  includes determining pesticide distribution in
ecosystems, mass conversion  and  movement,  interrelationships  in  ecological  func-
tions and  processes  and  physical  parameters  which  affect  the  fate  process.

1983 Explanation of Changes from Budget Estimate

     There are no changes to this program.

1982 Accomplishments

     In 1982, the Agency obligated a total  of $4,158,500  for this  program of which
$2,293,000 was under the Salaries and Expenses appropriation and $1,865,600 was for
extramural purposes under the Research and Development appropriation.

     Develop  and  Validate  Test  Methods  That  Identify Health and Environmental
Effects  of  Pesticides  for  the  FIFRA   Registration  and  Enforcement  Program.
laboratory research  addressed the application  of  methodsand  techniques  usea in
defining the role of  pesticides effects on  non-target  single  species  and selected
populations under controlled conditions  for  several  priority  biocides including
biological control  agents.

     DevelopHethodolpgies That Improve.the  Agency's  Risk  Assessment  Capability
Under'TlFRA."Research was conducted to develop pesticide exposure data and prldTc-
tive mathematical  models that could be applied by the regulatory office  in conduct-
ing risk assessments.
                                           P-17

-------
     Develop  .and  Validate Techniques That Assess  Human  and Environmental  Exposure
to Pestlcities Tor the FlfM Registration andTnforcenientProgram'Researchempha-
sis focusedOnthegeneration  ofexposureestimateso?pesticide  levels  which
estuarine/martne, freshwater and terrestrial  organisms  and ecological  processes way
experience.  Additionally,  two media and multimedia  exposure models were  assembled
or expanded  incorporating  the  research  exposure  estimates  or  information  from
previously existing  data bases.   These investigations considered  such factors  as
transport, fate,   sorption,  degradation and  biomagnification  and  the  physical/
chemical  properties  of  the  pesticides and  the  systems under  study.   Pertinent
information was  transferred to the regulatory  user  community.
                                         P-18

-------
Page Intentionally Blank

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
PESTICIDES
    ABATEMENT & CONTROL
       Registration, Special  Registration & Tolerances.	   P-20
          Registration...	,	   P-22
          Special  Registration	   P-24
          Tolerances	   P-25
       Generic Chemical Review & Special  Reviews - EIS Preparation..	  P-27
          Generic  Chemical  Review	   P-29
          Special  Reviews - EIS Preparation............	   P-31
       Federal 4 State Program Support......	'  P-33
          Pesticides Use Management	-	*........	*....,..   P-34
                                      P-19

-------
                                      PESTICIDES

                   Registration, Special  Registration 4 Tolerances

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Registration
 Salaries & Expenses
Special Registration
 Salaries 4 Expenses
Tolerances
 Salaries & Expenses
                       TOTAL
                       TOTAL
                       TOTAL
TOTAL:
 Salaries * Expenses

Registration, Special  TOTAL
Registration &
Tolerances
 $8,242.5   $7,224.6   $7,464.6   $8,916.3  $1,451.7
 $8,242.5   $7,224.6   $7,464.6   $8,916.3  $1,451.7
 $1,948.7   $2,227.7   $2,327.7   $2,569.4    $241.7
 $1,948.7   $2,227.7   $2,327.7   $2,569.4    $241.7
 $2,086.0   $2,390.2   $2,440.2   $2,713.4    $273.2
 $2,086.0   $2,390.2   $2,440.2   $2,713.4    $273.2
$12,277.2  $11,842.5  $12,232.5  $14,199.1  $1,966.6

$12,277.2  $11,842.5  $12,232.5  $14,199.1  $1,966.6
PERMANENT WORKYEARS


Registration

Special Registration

Tolerances

TOTAL PERMANENT WORKYEARS
202.7
47.6
81.1
331;4
183.5
57.8
62.4
303.7
183.5
57.8
62.4
303.7
183.5
57.8
62.4
303.7
TOTAL WORKYEARS


Registration

Special Registration

Tolerances

TOTAL WORKYEARS
213.7
50.9
82.4
347.0
203 .0
63.5
74.1
340.6
203.0
63.5
74.1
340.6
203.0
63.5
74.1
340.6
                                          P-20

-------
                                  PESTICIDES
                            \


                 Registration, Special  Registration and Tolerances
Budget Request
     The Agency requests a total  of $14,199,100 all  of which is in the Salaries and
Expenses appropriation and  303.7  permanent workyears.  This  request  represents  an
increase of SI,966,600 and no change in permanent workyears.

Program Description

     The goal  of these activities is to facilitate a steady flow Of environmentally
safe products to the marketplace.  The Agency  evaluates  all  pesticides  under  a "no
unreasonable adverse effects"  standard,  taking into account  the  economic,  social,
and environmental risks and benefits of the use of any pesticide.

     Registration— F1FRA  Section 3  requires that a  pesticide be  registered  by
EPA before it can  legally be  sold, distributed,  or made available  for  use.   Under
the registration program, new pesticide products  are  registered  and  current regis-
trations are  amended  to add  uses  and/or  new  formulations.   This  registration  is
accomplished by: (1) reviewing formulation  and use  information and supporting data
to ensure that  the  use of  the  products  will   not result 1n  "unreasonable  adverse
effects" to man  or the environment  taking  into  account the  economic,  social, and
environmental  risks and  benefits  of  the  use  of  any  pesticide;  (2)  ensuring that
public health  products  (e.g.,  hospital  disinfectants)  are  effective  for  their
proposed uses;  (3)  limiting the risks associated with  use through  label  precau-
tions, special packaging- requirements, application direction  and,  where necessary,
restriction of  use  to  trained applicators; and  (4)  providing incentives,  such  as
expediting reviews, for  environmentally  preferable  pesticides (those which  pose a
low level of  environmental  concern).  These  include  products such as  biorational
pesticides and pesticides which  provide  safer alternatives  to  cancelled products.

     Special  Registration — The special  registration  program performs an auxiliary
function to the  registration process  and  contributes  to  agricultural  production
and public health  by:   (1)  issuing  experimental use  permits —  allowing  experi-
mentation with  nonregistered products  or uses  to  develop data  needed  for registra-
tion; (2) approving temporary tolerances  —  establishing  safe  pesticide  residue
(tolerance)  levels for food or feed use crops to be marketed following the applica-
tion of experimental use  pesticides;  (3)  granting emergency  exemptions  —  permit-
ting the use  of unregistered  pesticides  or the  use  of registered pesticides for
sites and pests  not included in their registration  to meet  pest  emergencies  when
the benefits  of such  use  exceed  the  risk; (4)  reviewing  State  registrations  of
pesticides distributed  and  used  only  within  the  registering  State  for  special
local needs,   to  determine  if  proper tolerances  have  been  established  and  if the
chemicals involved have not been  suspended or cancelled; and,  (5)  reviewing  State
Experimental  Use  Permit plans  and  permits accessary  to  develop  data for  State
special  local  need  registrations.  These  functions are  required  by Sections 5, 18,
and 24 of FIFRA  and Section  408 of  the  Federal  Food, Drug, and Cosmetic Act (FFDCA).

     Tolerances --  The  tolerance   program  protects  the public health while  giving
appropriate consideration to the production of an adequate, wholesome, and economi-
cal food supply.  This  is  achieved  through  the  following  actions:  (1)  ensuring
that the maximum residue levels likely to be found in foods are safe for human con-
sumption through a  careful  review  and evaluation of residue  chemistry  and  toxico-
logy data;   (2)   subsequently,  establishing tolerance  levels  for  both  active and
inert ingredients, or exemptions from the requirement of a tolerance, for pesticide
residues in  or  on raw  agriculture  commodities  and  processed  foods,  including
establishing tolerance  levels  for  import  commodities  and  rotational  crops and
responding to minor use petitions  and Federal,-  State  and local  government  peti-
tions; and,  (3)  ensuring  through  the  testing  of analytical methods  that  adequate
enforcement of the  established tolerance can be  achieved.   Authorizing legislation
1s contained in the FFDCA, as amended, Sections 402, 406, 408, and 409.
                                         P-21

-------
REGISTRATION

1984Program Request

     The Aqency requests  a total  of  58,916,300,  all  of  which  is in  the  Salaries
and Expenses appropriation, and 183.5 permanent workyears.  This  amount represents
no change in workyears  and an increase of $1,451,700 to  fully  fund  personnel  com-
pensation in addition to increases in other expenses.

     In 1984, the Aqency expects  to  conduct  250  reviews of new chemicals  and  bio-
rationals, 8,500  reviews   of  old  chemicals,  20,300 amended  registration  reviews,
and 150 new  use  reviews.   New use reviews, formerly found  in old  chemical  reviews
and amended  registration  reviews, will now  be tracked  separately since  they  are
labor intensive units regardless  of  whether  they  are conducted as a  part  of a  new
product review or  for an  amendment  to a previously registered  product.   Also,  new
uses are  of much  greater concern,  economically  and   environmentally,  than  are
routine new products containing old  chemicals and  amendments.

     Priority,  through  reduced  data  requirements  and  rapid review,  will  continue
to be given to  environmentally protective  pesticides and alternatives to pesticides
which have been cancelled  or  which  pose serious  threats  to the environment.  Pro-
cess efficiencies will  .continue  to  be evaluated  and introduced,  when appropriate,
to reduce processing time  and  registration costs  for  both the Agency and industry.

     Long term  regulatory   reform projects,  which  will  be  explored in  1983-84
include:  general  registration, which  applies to  products  whose toxicology and use
patterns are well   understood  and of  Tittle concern,  permitting  registrant  self
certification of compliance with the appropriate Registration Standard; provisional
registration; expanded  use of  Section  25(b)  exemption  for  pesticides which  are
found to be  practically safe  or regulated  by  other  Agencies--additional  candidates
will  be identified  and  policies  for  granting  full  or conditional exemptions  will
be articulated; and,  fulfilling Executive  Order 12291 through the  review  of exist-
ing regulations.

     The Agency will  employ cost-benefit  studies and economic  impact analyses to
ensure that regulations  issued under FIFRA and FFDCA will result in minimal adverse
inpacts on the  economy  and the pestici.de  industry.  In addition, the  Agency  will
continue to  improve  communication to applicants  to  enhance the quality  of submis-
sions and will  continue to emphasize  timely  Informal  meetings with  applicants to
discuss problems  encountered  during  review in  order  to speed  resolution.  Admin-
istratively determined processing time limits for registration  actions will  be met
for at least 90%  of the actions.  Backlogs will  be maintained at or  near  zero  for
new chemical  and  biorational  registrations  and will be minimized  for old  chemical
and amended registration reviews as  demand permits.

     The Agency will  develop   and  implement a  systematic   approach  to identifying
the level   of  regulation  appropriate  for  classes  of  pesticides, e.g.,  chemical
families and use  situations.  As  provided  by  FIFRA  Section 2S(b),  pesticides which
are reviewed and  found  to  be  practically  safe or  adequately regulated  by another
Agency will  be  exempted from  regulation.   Work will  continue  on  farm safety  with
particular emphasis  on  reentry problems and  impacts  of agricultural  use  on human
health.  This  program will  focus  on  educating farm workers,  growers,  and  applica-
tors about  pesticide hazards,  and   involving  them  in  efforts  to mitigate  those
hazards.  Cooperative  agreements,  interagency agreements  (.Department  of  Labor,
U.S. Department of  Agriculture, etc.), and  contracts,  funded  through  the Generic
Chemical Review program element,  will  be  implemented  to promote safe pesticide use
practices among various exposure  and  user groups,  including city dwellers moving
into agricultural  areas.
                                         P-22

-------
     The Agency will  seek  to assess charges  to  the applicants for  certain  regis-
tration and  supporting  services  provided by  EPA.   These  funds  could go  directly
to the  U.S.  Treasury and  consequently  would  have  no  impact  on budget  authority
or appropriation needs of the pesticides program.

1983 Program

     In 1983, the Agency  is  allocating  a total of  $7,464,600,  all  of which  is  in
the Salaries and  Expenses  Appropriation,  and 183.5 permanent  workyears.   Priority
will continue to  be  given  to reducing  backlogs to  as close to zero  as possible  by
the end of  1983,  commensurate with  the  level of external  demand, and to  improving
response times for processing applications.

     The Agency expects  to conduct  250  reviews of new  chemicals  and biorationals,
8,500 reviews of  registrations for  new products containing  old chemicals  identical
or similar to  others already registered, and 20,300  amended  registration  reviews.

     As part  of  the  program's   regulatory   reform  efforts,  existing  regulations
(registration, reregistration and  classification  procedures;  disposal and  storage
guidelines; and the  Polynuclear  Aromatic  Hydrocarbon  (PNA) policy statement)  will
be reviewed and revised,  as  necessary.   Conditional  registration and compensation
regulations will be proposed  again for  notice and  comment and,  ultimately,  publish-
ed as  final  rules.   The  Label Improvement and  Farm  Safety Programs and use  of data
and reviews of  other organizations and  countries  will  be continued  on a  priority
basis.  Ground water contamination will  be given added emphasis.   Long term regula-
tory reform efforts,  identified  previously,  will  be  evaluated for possible  imple-
mentation.

     The Agency will  complete proposals  seeking to  assess fees  or other  charges  to
support pesticide registrations.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$240,000 results from the following  action:

     -Reprogramm1 n| s .^  (+5240,000)  During  the development of the operating plan,
several"'repragrammihg's were  made to this activity  which are   not  reportable under
the Congressional   reprogramming   limitations.   These  changes  resulted  in  a  net
increase of +5240,000 to the  Salaries  and Expenses  appropriation.

1982 Accomplishments

     In 1982,  the  Agency obligated 58,242,500,  all   of  which  was in the  Salaries
and Expenses appropriation.

     In response  to  the  Vice President's  Task Force  on  Regulatory Reform,  the
Agency completed  testing  guidelines for publication during  1983 by the  National
Technical Information  Services,   better  articulated  data  requirements,  revised
application procedures,  and  held  more   frequent pre-application  conferences  with
registrants.  As a  result, the  Agency  increased the  quality  of  data submission  in
support of registration  applications, and  thereby,  reduced the number of industry
resubmissions and  improved  the   timeliriess and  consistency  of  Agency  actions.
New regulatory  reform initiatives,  which were implemented, included exemption  of
some classes of pesticides (such as pheromones used  in insect traps) from regula-
tion under Section 25(b) of  FIFRA,  extension  of efficacy  data  waivers, approvalof
registrations based  on  draft labels in lieu  of  final  labels, eliroination  of pre-
market review  of  distributor  (supplemental)   applications,   and  provision  of  a
broader approach  to  determining packaging  effectiveness  for products  requiring
child-resistant packaging.

     Consistent with  Congressional  intent  and  OMB  direction,  EPA conducted  a
study in  1982  of  alternative funding mechanisms for  support  of  the  activities  of
this program.
                                         P-23

-------
     In 1982,  the Agency  conducted  221  reviews  of  new chemicals  and  new  bio-
rational s, 11,993  reviews  of  registrations  for  new  products that  contain  old
chemicals identical  or  substantially  similar  to  others  already  registered,  and
23,727 amended registration reviews.

     Outputs for  1982  exceeded the Agency's  original  expectations due  to  a major
effort directed to backlog  reduction.  The Agency  reduced backlogs  of new chemical
reviews by 92",  old  chemical  reviews  .by 97%., and amended  registration  reviews by
97%.

SPECIAL REGISTRATION
1984 Program Request

     The Agency  requests  a total  of  $2,569,400,'all of  which is  in  the  Salaries
and Expenses  appropriation,  and  57.8 permanent  workyears.   This  is  an  increase
of $241,700 to  fully fund personnel  compensation  and benefits.   Workyears  do not
change from 1983.

     In 1984j efficiencies  in the  Special  Registration  process,   featuring  a more
direct working  relationship  with pesticide  registrants and  the States, will  con-
tinue to  be  employed to  reduce  processing  times  and costs.   Statutory processing
times for experimental use permits  (120 days)  to  allow data  development  in support
of future registrations,  and  for the  review of State section 24(c)  registrations
(90 days) which  permit  the  use of oesticides  for special local needs  within indi-
vidual  state.s, will  be met  for the most part.   Decisions  on  FIFRA Section 18 emer-
gency exemption  requests  to  allow unregistered uses to meet  needs  arising  frora
acute and critical pest outbreaks, will generally  be reached  prior to the requested
implementation time (in any event  within  a target  processing time of 50 days), and
backlogs will be maintained  at  or near  zero.  The  Agency  will  support increased
State responsibilities  for  the  issuance  of experimental use permits  to develop
data for  special  local  needs  registrations through reviews  and approvals  of State
experimental  use  permit  plans  and  encouragement  to  registrants to  seek  State
experimental  use  permits  when  testing  in  only one State  is  required.   The special
registration  program  should  begin to  benefit  from additions to  the chemical  data
base resulting  from   chemical  reviews  conducted  in  the  process  of  establishing
registration  standards.

     In 1984, the  Agency  expects to conduct 770 reviews  for emergency exemptions,
475 reviews   for  experimental  use  permits,  100 State  experimental use  permit re-
views,  175 reviews  for temporary  tolerances,  and 1,100  reviews   of special  local
need registrations.

1983 Program

     In 1983, the  Agency  is allocating  a total of  S2,327,700 all of  which  is in
the Salaries  and  Expenses  appropriation,  and 57.8  permanent  workyears.  The Agency
will conduct a  formal  review  of experimental  use  permit regulations  and  conclude
the review of emergency exemption  regulations;  backlogs are  expected to  be reduced
further.  Consideration will  be given to measures  to reduce workload and processing
times such as  accepting  multi-year  experimental  use permit requests   rather  than
considering  only repetitive, one year  permits;  reducing Federal oversight  of State
registrations by  accepting  State certifications,  as appropriate,  and encouraging
the States to complete State experimental  use permit  plans under FIFRA Section 5(f)*.

     All  emergency exemption  requests  will  be decided  upon, whenever  possible,
prior to the time  their  use is  required.  Statutory time limits  for  experimental
use permits,  temporary tolerance petitions,  and special   local  needs  registrations
will be met.   Existing backlogs will be maintained near zero.

     In 1983, the Agency will   conduct  770 reviews  of emergency exemption requests,
475 reviews  of experimental  use permits,  100 State experimental use permit reviews,
175 reviews  of temporary tolerances and 1,100 reviews of special local  needs regis-
trations.
                                         P-24

-------
1983 Expl anati on of Changes from Budget Estimate

     The net Increase of +5100,000 results from the following action:

     -Re^rogrammijigs A  t+SlOO.OOO)  During  the  development of the  operating plan,
sever aT "re Tp rogr araiin n g 's were  made to this activity  which are not  reportable under
the Congressional   reprogramraing  limitations.   These  changes resulted   in  a  net
increase of +3100,000 to the Salaries and Expenses appropriation.

     Ace omp 1 <• s hmen ts
     In 1982, the Agency  obligated  a total  of 51,948,700  for this  program,  all  of
which was in the Salaries and Expenses appropriation.

     During 1982, major emphasis  was placed on  improving  response  times,  adhering--
to statutory deadlines,  eliminating backlogs,  and  reevaluating  regulations.   The
Agency began a  formal  review of emergency exemption regulations in 1982,  Pursuant
to the initiatives  of the  Vice President's Task Force  on Regulatory  Reform,  the
Agency met  with the  industry,  State and  association  representatives  to  identify
their concerns   and  obtain  recommendations  for  improving  the  program.   Operating
improvements were introduced,  including earlier  screening  of  requests  and  appli-
cations to  forestall  data  problems  later on,  improved  processing  procedures  for
experimental use  permits,   focusing  Agency  attention  on the  critical   health  and
safety aspects   of emergency exemptions  (relying  on  States to  assess  pest  problems
and evaluate available  pesticides),  and shortening   of  science review  time.   As  a
result .of  these improvements,  statutory, deadlines for  experimental   use  peraits
were met  for 83? of  the  actions,  and the existing   backlog  from 1981  was  reduced
by 83%.

     During 1982, the Agency conducted 752 reviews of emergency exemption requests,
499 reviews of  experimental  use permits, 167 reviews of  temporary  tolerance peti-
tions to permit the marketing of food products exposed  to pesticides during  experi-
mentation, and  1 ,656 reviews of State registrations.

TOLERANCES


1984 Program Request

     The Agency requests a  total of 52,713,400, all  of  which is in the Salaries and
Expenses appropriation, and 62.4 permanent workyears for this program.  This amount
represents an increase of  5273,200, which is to fund  personnel  compensation and bene-
fits.  Vlorkyears do not change from 1983.

     Requested  resources will permit  an anticipated 640 tolerance petition  reviews
and 50 reviews  of inert ingredient requests.   All  possible  tolerance petition reviews
will be completed within  statutory  time limits  in  the  review process by employing
such methods as  a  fast track  system when limited  scientific  review  is required.

     The Agency, after all  attainable efficiencies are achieved  in the process, will
consider whether Congressional  legislation  may be  appropriate  to  extend statutory
processing deadlines  for petitions.  Tolerance oetitions  now  involve  the review of
far more  sophisticated  data than was anticipated when  the current  time limit was
enacted into law.  The backlog  of overdue petitions will  be  kept low.  Most of the
inert ingredient requests will be processed within 90 days.  It is anticipated that
modifications to the  system,  proposed in 1982,  such as  crop  grouping, will permit
processing for most minor  use petitions to be completed  within 90 days.  This new
approach will reduce data  requirements,  save Agency resources,  and  broaden the appli-
cability of tolerances so that  the  States can  issue "special  local  need" registra-
tions for minor uses.
                                        P-25

-------
     The Agency will  continue  to  utilize the policy of  reducing  data requirements
for minor uses  of  pesticides.   Tolerance fees charged will  cover  reasonable costs
of proc.ess.1nd  applications,  as authorized under  Section  408 of the  Federal  Food,
Drug and Cosmetic Act  (FFDCA).  The Agency will  continue  to  waive  fees when aporo-
priate to the  public  interest  (Federal  or State  agency  requests,  important public
health uses,  innovative  pesticide  chemicals, and  chemicals  and biorationals  used
in integrated pest management).

1983 Program

     The Agency is allocating a total  of  SZ,440,200,  all  of which is in the Salaries
and Expenses appropriation, and 62.4 permanent workyears to this program.

     The Agency expects  to  conduct 640 tolerance petition reviews, and  50 reviews
of inert ingredient requests.   The backlog  of tolerance  petitions  will  be reduced
but not totally eliminated by the end of the  year.  Most of the tolerance petitions
will  be  processed  within  statutory deadlines.   Petitions  without statutory  time
limits will  be completed  on  the  same  schedule as petitions with statutory reauire-
pients.  Comments will  be reviewed  on policies  proposed  in 1982 for  crop grouping
and food  additive  tolerance  requirements.   The  Tolerance  fee  structure will  be
revised to more fully cover the costs of the  program.

1983 Explanati on of Changes from Budget jEstimate

     The net increase of +S50.000 results from the following action:

     -Reproqrammings.  (+550,000)   During  the development  of the  operating  plan,
several fepro.gramnrings were  made to this activity  which are  not  reportable under
the Congressional  "reprogramming limitations,   These  changes  resulted   in  a  net
increase of +$50,000 to the Salaries and Expenses appropriation.

1982 Accompl i shiTients

     In 1932, the Agency obligated a total  of $2,086,000 for this  program,  all  of
which was in the Salaries and Expenses appropriation.

     The Agency conducted 599 reviews of  tolerance petitions  and 58 reviews of inert
ingredient requests.  To  reduce  the petition processing time, preregistration con-
ferences with applicants  were  implemented to identify and  resolve  possible issues
on petitions  and  a  priority  review system was  established  to assure  that  review
attention is  allocated appropriately.  The Agency utilized  the policy  of reducing
requirements for minor uses  of  pesticides and  begap  using crop tolerance groupings
of petitions which broaden  the applicability of tolerances.   The  proposed rule  to
expand the concept of  crop grouping was published for  comment  in the Federal Register
in 1982.  It is anticipated that farmers  will  benefit  significantly fnxiPfhis'pro-
posed change in procedures.

     The Agency also  developed  a proposed policy statement to  eliminate  food additive
tolerance requirements for pesticides applied to bodies of water; residues in drink-
ing water will  be  governed  by  the  Safe Drinking Water Act rather than FFDCA.  This
new policy  was  published for public  comment in 1982 in  the Federal  Register.  In
addition, measures for backlog reductions and turnaround  time efforts were incorpo-
rated in employees' performance  standards,  thus assuring  better management  of the
process,
                                        P-26

-------
                                      PESTICIDES

             Generic Chemical Review & Special Reviews - £IS Preparation

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Generic Chemical Review
 Salaries & Expenses           $9,253.9              $7,965.0   $8,715.8    $750.8
 Abatement Control &          $12,725.5             $11,570.7  $10,570.7 -$1,000.0
 Compliance
                       TOTAL  ..$21,979.4             $19,535.7  $19,286.5   -$249.2

Registration Standards
 Salaries & Expenses                      $3,689.9
 Abatement Control *                      $4,180.1
 Compliance
                       TOTAL              $7,870.0

RPAR Reviews
 Salaries 4 Expenses                      $4,470.9
 Abatement Control &                      $7,390.6
 Compliance
                       TOTAL             $11,861.5

Special Reviews - E.IS
Preparation
 Salaries 4 Expenses              $97.9     $105.4     $105.4      $55.6    -$49.8
                       TOTAL      $97.9     $105.4     $105.4      $55.6    -$49.8

TOTAL:
 Salaries 4 Expenses           $9,351.8   $8,266.2   $8,070.4   $8,771.4    $701.0
 Abatement Control j          $12,725.5  $11,570.7  $11,570.7  $10,570.7 -$1,000.0
 Compliance

Generic Chemical       TOTAL  $22,077.3  $19,836.9  $19,641.1  $19,342.1   -$299.0
Review & Special
Reviews - EIS Preparation


PERMANENT WORKYEARS
Generic Chemical Review           218.1                 185.9      185.9

Registration Standards                        93.3

RPAR Reviews                                  92,6

Special Reviews-EIS                 2.4        3.0        3.0        1.5      -1.5
Preparation

TOTAL PERMANENT WORKYEARS         220.5      138.9      188.9      187.4      -1.5
                                        •P-27

-------
                         PESTICIDES
Generic Chemical Review & Special Reviews - EIS Preparation
                   ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                    1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                              1983       1983             1984 VS 1983
TOTAL WORKYEARS

Generic Chemical Review
Registration Standards
RPAR Reviews
Special Reviews-EIS
Preparation
TOTAL WORKYEARS
                   (DOLLARS IN THOUSANDS)
224.8
  2.4
227.2
 99.6
 93.3
  3.0

195.9
192.9
                        3.0
                      195.9
                                                      192.9
             1.5
           194.4
                                                                 -1.5

                                                                 -1.5
                             P-28

-------
                                     PESTICIDES


           Generic Chemical Review and Specia) Reviews - EIS Preparation


Budget Request

     The Agency  requests  a  total  of 519,342,100  and  187.4  permanent  workyears
for 1984, a  decrease  of 5299,000 and 1.5 permanent  workyears  from 1983.   Included
in this  total  are  58,771,400  for Salaries and Expenses  and $10,570,700  for Abate-
ment,  Control  and  Compliance,  an increase  of $701,000 and a decrease  of $1,000,000
respectively, mainly in the Generic Chemical  Review program.

Program 0e s c ri p t i on

     Generic Chemical  Review --  The  Generic  Chemical   Review program  (this  new
program consoli dates  resources  from the previous  Registration Standards  and  RPAR
Review Programs) consists of the Registration Standards and Special Review decision
processes.  The goal  of this  program is to  reregister  currently  registered pesti-
cides and to evaluate potentially hazardous pesticides.  The Registration Standards
process was  established to enable  the  Agency to meet  efficiently the mandate  in
Section 3 of  the  Federal  Insecticide,  Fungicide, and  Rodenticide Act  (FIFRA)  to
reregister currently  registered  pesticides.   The  Special   Review  decision  process
(formerly RPAR) evaluates pesticides which have an identified potential for produc-
ing significant adverse health or environmental  effects.

     The Generic Chemical  Review program  is  designed to update the scientific data
base supporting  registrations  and establish  scientifically  based  regulatory  stan-
dards for  the  reregistration  of  existing  pesticides  and  efficient  registration
of new or amended  products.   The program also systematically  identifies  and  takes
appropriate regulatory  action  on  problems  wtlich  some  pesticides pose  for  human
health and the environment.  The  Registration  Standards process  begins long before
the issuance of  formal  registration  standards  guidance packages with the identifi-
cation and systematic call-in  of data  to  fill many  of the most critical  data  gaps.
This approach  assures  early attention  to the most   vital  known   requirements  for
additional data and begins  a  process that leads to  reregistration  for  most chemi-
cals.

     Special  Reviews -  Environmental Impact Statement Preparation —  The  goal   of
this program is the p~reparation  of  statements  which  delineate  the impact on humans
and/or the environment  due  to  exposure to a pesticide  under consideration through
the Special  Review process.  Such  statements  are part of the documentation leading
to Special Review decisions.

GENERIC CHEMIC AL REVI EH

 1984 Program, Request

     The Agency requests  a  total  of 319,286,500 and  185.9  permanent  workyears  for
this program,  of  which 18,715,800  is  for the Salaries  and Expenses  appropriation
and $10,570,700 1s  for  the Abatement, Cqntrol and Compliance  appropriation.   This
represents an  increase  of $750,800 .and a decrease of 51,000,000,  respectively,  for
the purpose of  fully  funding personnel  compensation  and benefits  costs.   Workyears
requested do  not  change  from 1983.   The  extramural  resources will  be  used  for
information services,   scientific data review  contracts to  support  special  review
decisions and the  establishment  of  registration  standards (exposure/hazard assess-
ment,  risk/benefit  analysis,  toxicology,  health  effects,  etc.),  site/pest inform-
ation, pesticide use  information, economic  impact  analyses of various  regulatory
recommendations, and  to  fund  various  pesticide  monitoring  and  integrated  pest
management projects.
                                        P-29

-------
     These resources  are expected  to  permit the  completion  of 10  Special  Review
 decisions.  The new  process  should provide  for  fewer formal  reviews or administra-
 tive hearings  and  nore negotiated  settlenents  for  Special  Review  chemicals.  This
 will result  from  improvements in the quality  of scientific  reviews,  revisions in
 criteria  for  the  initiation  of intensive  special  review in  order  to  reflect risk
 more realistically,  and attention  to  alternative  risk  reducing measures.   Nego-
 tiated settlenents  will  be   encouraged  through  improved  communication  with  all
 involved  parties  and  scientific  evaluation  will  continue  to  be  subject  to  peer
 review.   A total  of  18 laboratory audits  are  projected and the  results  will  be
 fed into  the Special Review and Registration processes to assure that data concern-
 ing health  and environmental  effects used  in  support  of pesticide  registration
 actions are accurate  and reliable.  The  use of  Integrated  Pest Management will  be
 furthered through  development  of  models  useful  in urban  pest management.   The
 Agency will work  with Government agencies and  others in  developing  such models —
 particularly for problems such as rodent control.

     It is anticipated that  35  registration standards,   up  5Q  percent  from 1983,
 will be established and  the Agency  will continue the implementation of data call-in
 by requesting  long-term chronic  health data on chemicals for which  standards  will
 not yet have been  started.  Data  call-in  will  ensure that these critical data will
 be available  by  the  tine  standards development begins.   In  1984,  the  use  of the
 cluster concept and  ranking  strategy  will be continued  to  ensure,  whenever feasi-
 ble, early review of  clusters  with  high  volume,  high  exposure  (especially  food
 uses), and significant potential  hazards.  The  resource  efficiencies  derived from
 the cluster approach  come  primarily from  the  simultaneous  review  of  all  products
 with similar  uses,  the  more  efficient  assessment  of  use  patterns  and exposure,
 and the  ready availability  of information  on  alternatives  in the event  Special
 Review of any of the members of a cluster is required.

 1983 Program

     In 1983,   the  Agency is  allocating a total  of  $19,535,700 and  185.9 permanent
 workyears to this  program,  of which $7,965,000 is  under  the  Salaries  and Expenses
 appropriation and 511,570,700  is  for  extramural  purposes  under the  Abatement,  Con-
 trol and Compliance appropriation.

     During 1983,  emphasis will  be placed  on completing  final resolutions on those
 chemicals remaining  in  the  Special  Review process in order to resolve uncertainty
 among producers and users.   Emphasis will also  be  placed  on analysis of new chemi-
 cals which exceed the  risk criteria.   New reviews will  be initiated principally as
 a result  of  reviews and new  data developed under the registration  standards  pro-
 cess.  When adverse  effects  data  are  identified  through  registration  standards
 development,  the  Agency will  issue combined pre-Specia.l  Review and  Registration
 Standards documents  to  reduce  duplicate effort.   A total   of  13   Special  Review
 decisions are  anticipated.   Integrated Pest  Management  approaches  and  other alter-
 native practices will  be considered in  Special  Reviews  to be  certain  that  a  full
 range of potential risk reduction measures are  examined,   A total  of 18 laboratory
 data audits is projected.   The  formal  Industrial  Biotest   data  reviews will  be
 completed.  Any other  miscellaneous data will be reviewed under Registration Stan-
 dards.   All  sponsors  of Industrial  Biotest  studies  will  be  notified  of the results
 of the program review.

     Efficiencies in the registration  standards  process  are expected to contribute
 to the establishment of 22 standards.   The Agency will  continue to  pilot and imple-
ment additional efficiencies  and  will  explore  additional approaches to increasing
 industry involvement in  the  process as  a means of  reducing review  time  and eosts.
 Some cluster  reviews  will  be  completed   in  1983.   Data  call-in will  continue  to
 ensure that critical  data gaps are filled early.
                                        P-30

-------
1983 Explanation of Changes from Budget Estimate

     The net increase of +$15,535,700 results from the  following actions:

     -Restructuring.  (+$19,731,500)    the  Congressionally  approved  restructuring
transferred Registration Standards and RPAR  Reviews  into the new  program  element
Generic Chemical  Reviews.  This allowed for  better management  of  resources  by  com-
bining two program elements which were  similar  in nature.  The  change  to  the  Sala-
ries and  Expenses  appropriation was  +$8,160,800  and  the change  to  the  Abatement*
Control and Compliance appropriation  was +$11,570,700.

     -Co n g res si on a 1 Ac ti o n.   (+$44,200)  This  increase   includes +$44,200   of the
S10.5 nilTioh Salariesand  Expenses  add-on  which  supports the 480  additional  per-
manent full-time workyears  provided to the Agency.

     -Reprogrammings.  (-$240,000).  During the  development  of the  operating  plan,
several reprogrammings  were  made to  this activity which are not  reportable  under
the Congressional  reprpgramming 1 imitations.   These   changes  resulted  in  a  net
decrease of -$240,000 to the Salaries and Expenses appropriation.

 1982 Accomplishments

     In 1982, the Agency obligated a  total  of $21,979,400 for this program of which
59,253,900 was  under the  Salaries  and Expenses  appropriation  and  $1~2,725,500  is
for extramural purposes under the Abatement,  Control  and Compliance appropriation.

     Special Review  decisions   were  reached  on 1.6  chemicals and  a  total  of  13
lab audits  were  performed.  Industrial  Biotest Laboratory  reviews  were  completed
on 98 chemicals.  The  emphasis  in  Integrated Pest Management activities  was on the
control of urban pests.

     In 1982, 18  Registration  Standards Guidance Packages  were established  for a
cumulative total  of 42.  Internal procedures  and productivity improvements developed
in earlier years  were implemented.  A(oilot program was initiated on the development
of standards  for  new chemicals  and  work continued on the  review of  chemicals  in
clusters.  The Agency increased involvement by registrants in the review process by
supplying them with  a bibliography  of available  data and discussing  use patterns
and data retirements with them early in the process.

SPECIAL REVIEWS - ENVIRONMENTAL IMPACT STATEMENT PREPARATION

1984 Program Request

     The Agency requests a  total  of $55,600, all  of  which is in  the  Salaries and
Expenses appropriation,  and  1.5 permanent workyears.   This represents  a decrease
of 549,800  and  1.5  permanent  workyears  which reflects the  reduction   of  formal
reviews being  conducted for  Special   Review  chemicals.   Activities  projected for
1984 include preparation in the Special Review process of analyses on the projected
impacts on  humans  and/or  the  environment due  to exposure  to  a pesticide.   Such
analyses are  part  of  the  documentation  supporting  Special  Review  decisions.   In
develooing the documentation, the Agency considers the adverse  effects (health and
environmental impact)  of the pesticide  under review.   This  analysis is an integral
part of the Special  Review documentation  and is not issued as  a  separate Environ-
mental Impact Statement.

1983 Program

     In 1983, the  Agency is  allocating a  total  of  5105,400  and  3.0 permanent work*
years to this program, all  of which is for the Salaries and Expenses Appropriation,
Activities  for 1983 are basically the  same as those described above.
                                       P-31

-------
1983 Explanation p_f_ Changes from B^dgejt Estimate

     There is no change to this program.

1982 Accomplishments

     In 1982, the Agency obligated a  total  of 597,900,  all  of  which was  in Salaries
and Expenses  appropriation.    Activities   completed  included  preparation   in   the
Special Review process  of impact analyses  concerning exposure to pesticides.   The
analyses were used to support Special  Review  decisions.
                                       "P-32

-------
                                      PESTICIDES

                          Federal and State Program Support

                                ACTUAL "  BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IK THOUSANDS)
PROGRAM
Pesticides Use
Management
 Salaries & Expenses
TOTAL:
 Salaries & Expenses

Federal and State
Program Support
                       TOTAL
TOTAL
          $550.5
          $550.5
$550.5

$550.5
PERMANENT WORKYEARS
Pesticides Use
Management

TOTAL PERMANENT WORKYEARS
            13.0
            13.0
TOTAL WORKYEARS


Pesticides Use
Management

TOTAL WORKYEARS
            13.2


            13.2
                                         p. 33

-------
                                  PESTICIDES


                      Federal  and State Program Support
Budget Request
     The Agency requests  no funds or permanent  workyears  for 1984,  In  1982,  the
pesticide use management  program  activities were  integrated  into  other  pesticide
programs.

Program Description

     This program includes consultation  and the exchange of information  .and techni-
cal advice between the Agency and  Federal,  State and  local  officials with  interests
in pesticide regulation,  as  well  as  assistance to pesticide users,  pesticide  pro-
ducers, and  the  general  public, to promote  compliance  with pesticide  regulations
and safe use practices.

PESTICIDE USE MANAGEMENT

19.84 Program Request

     The Agency requests no funds  or permanent workyears for 1984.

1983 Program

     In 1983,  the  Agency  is  allocating  no  funds  or permanent  workyears  to  this
program.  The functions of  this program  that are being  continued are supported  in
other pesticide program elements,  e.g.,  Registration.

1982 Accomplishments

     In 1982,  the  Agency  obligated a total  of $550,500 for  this  program, all  of
which was  under  the  Salaries and  Expenses appropriation.   The program  provided
Regional offices  with program documentation  and guidance  on  Agency programs  and
policies regarding pesticide  registration,  regulatory requirements, and  pesticide
incidents requiring Agency technical  expertise.   Information and referral  services
were provided  to  Federal, State,  and local  agencies; trade organizations; poison
control centers;  hospitals;  physicians;   and  worker clinics In dealing  with pesti-
cide problems.   The  integration  of  pesticide  use  management  functions into  other
pesticide programs  enabled  direct consultation  between Agency  headquarters  tech-
nical specialists (who have  intimate, firsthand knowledge   of pesticide regulatory
policies, processes,  and  actions),  State  and  local  officials,   and pesticide  pro-
ducers and users, thus expediting the exchange of information,  advice, and assis-
tance on matters of concern to the pesticide community.
                                        P-34

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1934 Budget Estimate

                                Table of Contents


                                                                            Page

PESTICIDES

    ENFORCEMENT
       Pestldices Enforcement	,	    P-36
          Pesticides Enforcement.,	,	    P-37
          Pesticides Enforcement Grants	    P-39
          Pesticides Certification  & Training	,	    P-40
                                       P-35

-------
                                      PESTICIDES

                                Pesticides Enforcement

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 VS 1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Pesticides Enforcement
 Salaries & Expenses           $4,111.5   $3,670.1   $3,785.6   $4,075.1     $289.5
 Abatement Control  &              $18.9      $45.3      $45.3 -     S45.3
 Compliance
                       TOTAL   $4,130.4   $3,715.4   $3,830.9   $4,120.4     $289.5

Pesticides Enforcement
Grants
 Abatement Control  &           $9,087.4   $6,918.4   $8,702.9   $6,918.4  -SI,784.5
 Compliance
                       TOTAL   $9,087.4   $6,918.4   $8,702.9   $6,918.4  -$1,784.5

Pesticides
Certification 8
Training
 Abatement Control  &           $2,579.1   52,000.0   $2,000.0   $2,100.0     $100.0
 Compliance
                       TOTAL   $2,579.1   $2,000.0   $2,000.0   $2.100.0     $100.0

TOTAL:
 Salaries S Expenses           $4,111.5   $3,670.1   $3,785.6   $4,075.1     $289.5
 Abatement Control  &          $11,685.4   $8,963.7  $10,748.2   $9,063.7  -$1,684.5
 Compliance

Pesticides Enforcement TOTAL  $15,796.9  $12,633.8  $14,533.8  $13,138.8  -$1,395.0


PERMANENT WORKYEARS
Pesticides Enforcement            114.6       96.6       96.1       90.9      -5.2

TOTAL PERMANENT WORKYEARS         114.6       96.6       96.1       90.9      -5.2


TOTAL WORKYEARS
Pesticides Enforcement            124.2      104.7      104.2       99.6      -4.6

TOTAL WORKYEARS                   124.2      104.7      104.2       99.6      -4.6
                                         P-36

-------
                                      PESTICIDES


                                Pesticides Enforcement


 BudgetRequest

      The Agency requests  a total  of  513,138,800  and 90.9  permanent workyears  for
 1984, a decrease of $1,395,000 and  S.2  permanent  workyears  from 1983.   Included in
 this total   is  54,075,100  under  the   Salaries   and  Expenses  appropriation,  and
 $9,063,700 under the Abatement, Control  and Compliance appropriation,  an  increase
 of $289,500 and a  decrease of 51,684,500 respectively.  The overall reduction  re-
 flects a continuing shift in emphasis  from Federal  to State  enforcement.

 Program Description

      This activity  includes  monitoring  the  pesticide Industry  — including  pro-
 ducers, distributers and  users —  for  compliance  with the Federal  Insecticide,
 Fungicide,  and  Rodenticide Act (F1FRA);   providing   compliance  assistance to  the
 regulated community;  and  preparing and  issuing,  where compliance first cannot  be
 gained by other means,  notices of  violation  and  administration orders.   Also  in-
 volved in this activity is the management and  funding of  State cooperative  enforce-
 ment agreements and  State  certification and  training programs.   As  a  result  of
 Federal and State  agreements, the  program is conducted largely by  cooperating  State
 agencies.

      Pesticides Enforcement-- This program emphasizes gaining  compliance by  the
 pes11 cide ihdustry  a 110*  users  with  registration,  classification,  and   labeling
 requirements.   Headquarters  provides  enforcement   support to the  FIFRA regulatory
 development process; designs, implements, and  oversees compliance  monitoring  acti-
 vities.  The  Regional  offices  negotiate and  manage  grants- for  the   cooperative
 enforcement programs and   the  State  applicator  certification  programs;   provide
 Federal compliance monitoring  1n  States  not  participating  1n  the cooperative  en-
 forcement program; and, monitor laboratories performing tests as required  by  FIFRA
 regulations.  The  Regional  pesticide  enforcement  program also provider compliance
 assistance  to  the  agricultural  chemical  industry, commercial and  private  applica-
 tors, user groups  and States.

      Pesticide Enforcement Grants  — This program provides  for  the bulk of  pesti-
 cide compliance monitoring  activities in the  United States.   Under  the   terms  of
 cooperative agreements  vrith  EPA,-States  Inspect pesticide producer establishments,
 provide marketplace surveillance,  and investigate  pesticide  use, misuse, and  field
 reentry questions.   The   grants  also   support the  States   in  surveying pesticide
 Imports, Inspecting pesticide  dealer  records   and  reviewing commercial applicator
 records.

      Pesticides Certification and  Training—  Pesticides  certiflcaton  and  training
 insures that  highly  toxic,  restricted  use pesticides  are  handled,  applied^  and
 stored only by competent,  trained applicators.  Funds for  training applicators  are
.transferred to the U.S. Department  of Agriculture for distribution to  State  Coop-
 erative Extension  Services.  Certification  funds  are distributed through grants to
 designated  State agencies.  Funds  are  used by the  States for certification activi-
 ties, such  as developing  and  grading  exams, Issuing  credentials,  monitoring  train-
 ing, and keeping records  of  certified applicators.  The  EPA also  provides funding
 for Federal  certification and  training  programs  in Colorado,  a State   that  has
 chosen not  to  conduct its  own certification  and training  programs.

 PESTICIDES  ENFORCEMENT

 1984 Program Request

      The Agency requests  a total  of  54,120,400 and  90.9  permanent workyears  for
 this program,  of which $4,075,100 1s  for  Salaries and Expenses, and $45,300 is  for
                                         P-37

-------
Abatement, Control  and  Compliance,   This is  a  decrease of 5.2  workyears,  an  in~
crease of 5289,500 for  Salaries and Expenses, and no change for  Abatement,  Control
and Compliance.   Regional  resources  are reduced  11.7  permanent  workyears  which
reflects increased participation by States, Territories and Indian Tribes in  coop-
erative enforcement and  certification  programs.   Headquarters  is increased by  6.5
permanent workyears to  support activities,  such as quality  assurance and labor-
atory training  for State  chemists,  which  were previously conducted by National
Enforcement Investigations Center  (NEIC).   The  increase  in Salaries and Expenses
is due to higher personnel costs and reflects a more balanced sharing  of ADP  costs
between pesticides and  toxic  substances  enforcement.   Contract  funds will  be used
for ADP  support  to store annual pesticide  production data  as  required by  Section
7 of FIFRA, and  for  support  .of the FIFRA and TSCA  Enforcement System (FATES),  the
computer system used to store and maintain compliance  data.

     In 1984,   the  first  priority  of the pesticides  enforcement program  will  be
continued cooperation with States.  Emphasis will  be placed upon achieving  compli-
ance with  pesticide  use  and application  rules and  upon enhancement  of  overall
compl lance with FIFRA  through" cooperative  agreements.   As a  consequence  of this
enhanced State role in  the overall program, the primary Federal   role  will continue
to be  in program management  and  training.   The  enforcement  program will  include
the oversight  of  State  cooperative agreements  and applicator  certification  and
training programs, administration of Federal  applicator certification and training
programs in Colorado  (Nebraska  is  expected  to accept the certification program in
1983), and  administration of  certification  and  training  programs  among  Indian
Tribes.  A comprehensive evaluation of the cooperative  enforcement programs  will be
conducted and  the  measurement of  environmental  results will  be  included in  State
agreements.

     Headquarters will  provide  support  to  the  FIFRA  regulatory  development  and
review process and will  manage  and  execute  national programs to  monitor  compliance
with FIFRA regulatory actions,  such  as the Toxaphene cancellation order  issued in
1983 and  the   Child  Resistant  Packaging rules.   Headquarters   will  also  provide
oversight to  cooperative Federal/State  enforcement pro.grams  and State  applicator
certification and  training  programs.  Technical  support  for  Regional  activities
wil1 be provided.

     The Regional offices will  negotiate and manage  grants  for the  cooperative en-
forcement pro.grams and  the certification programs,   Federal compliance  monitoring
in those States  (Colorado, Wyoming,  Ohio)  not .participating fully in  the  coopera-
tive enforcement program  will be  increased to  upgrade these  programs to  a  level
comparable with the cooperative State programs.   Monitoring laboratories  conducting
tests required by FIFRA  regulations will :be allo undertaken by  the Regional offices.

     In addition,  the  Regional  enforcement program  is  committed  to provide com-
pliance assistance to  the agricultural  chemical  industry,  commercial and  private
applicators, user  groups, and States  to  assist  them in  obtaining product  registra-
tions, experimental use permits, special  local  need registrations,  emergency exemp-
tions, and to  understand  and  meet  their  obligations under FIFRA.  Providing assis-
tance should help  preclude the need for future enforcement activity in most  in-
stances,

     The Regional enforcement program  will  also prepare and issue notices  of vio-
lation and administrative orders, with  the  concurrence  of the Office  of Legal  and
Enforcement Counsel (OLEC).    In addition, the program will  assist and support OLEC
in the development of civil  and criminal  referrals,

1983 Program

     In 1983,  the  Agency, is  allocating  a  total  of $3,830,900  and  96.1  permanent
workyears to this  program,  of  which $3,785,600  is for  Salaries  and  Expenses  and
$45,300 is  for extramural purposes  under  the' Abatement,  Control  and  Compliance
Appropriation.
                                        P-38

-------
     The first priority of the pesticides enforcement program is developing  and en-
hancing the cooperative programs between  EPA and the  States.   To  further this end,
the Agency continues to manage  52  cooperative  enforcement agreements and 50  State
certification and 52 training programs.   Training  of State personnel  is  continuing,
as is Federal compliance monitoring activities  in  those States not participating in
the grant program  and  in  those  States  with problems  which  the State  cannot  ade-
quately address.  Federal  compliance  assistance 1s  bging  provided  to  the regulated
community.  Efforts also  include preparing and  issuing  notices  of  violation  and
administrative orders.

1983 Explanation of Changes from BudgetEstimate

     The net increase  of +5115,500  results from the  following actions:

     -Congressional Action.   (+520,000)    This  increase  includes   +520,000  of  the
S10.5 million Salaries an
-------
1983 Program

     In 1983, the Agency is allocating 53,702,900,  all  of which is under the Abate-
ment, Control and Compliance appropriation, for cooperative enforcement grants with
States and Territories.  In 1983, these agreements  stress compliance with pesticide
use and application regulations,  and  improvement of State program priority-setting
methodologies.  As in previous years, the  pesticides enforcement  program  will  fos-
ter user  compliance  with  label  directions and manufacturer  adherence  to  product
formulation requirements under FIFRA.

     One new State, Nebraska,  will  be added  to the cooperative enforcement program
for a total of 53 States and Territories,

1983 Explanation of Changes f_rom_ Budget Estimate

     The net increase  of +S1,734,500 results  from  the following action:

     -Congressiona 1 Acti6n.  <•*•$! ,784,500)   The Congressional  add-on to this activ-
ity of +Sl',784,500 to  the  Abatement,  Control  and   Compliance  appropriation  was for
the State pesticides enforcement grants program.

1982 Accomplishments

     In 1982, the Agency obligated  59,087,400  all  of which is under the Abatement,
Control  and Compliance appropriation,  for cooperative agreements with 52 States and
Territories.  This funding provided resources  for  States to conduct:  2,318 estab-
lishment inspections;   13,850  use and  reentry  inspections; 15,808  marketplace in-
spections; 183 import  Inspections, 14,005 applicator license and record inspections;
and, 11,967 dealer record inspections.

PESTICIDES CERTIFICATION. AND TRAINING

1984 Program Request

     The Agency  requests  a total  of  $2,100,000  for this  program, all  under the
Abatement, Control  and Compliance  appropriation.   The  program  will  support  51
applicator certification  and  52  training  programs in  States and  Territories and
a federally  run  program  in  Colorado.   This  is an  increase   of  5100,000  for the
certification program   in  Nebraska,  which  will  be  conducted  by the State  for the
first time in  1984.   States  will  be encouraged to raise  or implement fees to pro-
vide for  increased  State  support  for  the certification  programs.   The EPA  will
assist States in designing improved training  materials in 1984.

1983 Program

     In 1983, the Agency is allocating $2,000,000,  all  under the Abatement,  Control
and Compliance appropriation,  for  50  certification  and 52 training  programs  with
States and  Territories.   In  addition,  these  funds  support  Federal   programs  in
Colorado and  Nebraska.  The  resources will  continue to be used  for certification
and training  in  the   application  of  highly   toxic,   restricted  use  pesticides.

1983 Explanation of Changes from Budget Estimate

     There is no change to this program.

1982 Accomplishments

     In .1982, resources obligated were 52,579,100,  all  under the Abatement, Control
and Compliance appropriation,  for  funding 50  certification  and   52 training pro-
grams in  States and Territories.  In  addition,  resources  funded Federal certifica-
tion and training programs in Colorado and Nebraska.
                                       P-40

-------
Radiation
   SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents



                                                                           Page


SAD IATION                                                                  R-l

    RESEARCH 8 DEVELOPMENT
       Nonionizing Radiation	  R-6
    ABATEMENT « CONTROL
       Radiation Criteria, Standards A Guidelines......*	...  R-l*
       Radiation Program Implementation	,	  R-17
       Radiation Environmental Impact Assessment.	  R-20
                                       R-l

-------
                                      RADIATION

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
                                (DOLLARS IN THOUSANDS)

APPROPRIATION
  Salaries & Expenses           S8,130.7   $7,917.8   $8,340.0   $7,742.4    -$597.6
  Abatement Control &           $2,987.2   $2,195.7   $2,195.7   $3,095.7     $900.0
  Coropl iance
  Research & Development          $917.5     S237.6     S387.6      $16.7    -$370.9

TOTAL, Radiation              $12,335.4  $10,351.1  $10,923.3  $10,854.8     -$68.5

PERMANENT WORKYEARS           "   150.3      135.1      148.1      126.9      -21.2
TOTAL  WORKYEARS                   169.6      159.9      172.2      146.4      -25.8
OUTLAYS                       $12,349.0  $11,147.0  $12,483.0  $11,419.0  -$1,064.0
•AUTHORIZATION LEVELS
                                       R-2

-------
                                     RADIATION


.OVERVIEW AND STRATEGY

     EPA's mandate to  protect  the  public  health and  environment from adverse  ef-
fects of  radiation  exposure  is derived  from  several  statutes:  (1)  the  Federal
guidance and  general  environmental  standard authorities  under the Atomic  Energy
Act, transferred  to  EPA  by Reorganization  Plan  #3  of  1970;   (2)  the  Clean  Air
Act Amendments  of  1977  which  provide  authority  to  regulate  radioactive  air
pollutants through the  standard setting authorities  of the Act; (3)  the  Resource
Conservation and Recovery Act  and  the  Uranium Mill Tailings Radiation Control  Act
which charge EPA with providing standards  for protection  from waste materials with
radioactive content;  (4)  the  Nuclear Waste  Policy  Act;  and (5)  other authorities
contained in the Federal Water  Pollution Control Act, the Marine Protection Research
and Sanctuaries Act,  the Safe Drinking Water Act, the Public  Health  Service Act,
and the National Environmental  Policy Act.

     EPA's legislative authorities generally prescribe an environmental assessment,
technology assessment, and standard setting role for EPA,   In some cases enforcement
responsibilities are  given  to  other agencies, notably the  Nuclear  Regulatory Com-
mission.  In these instances,  EPA  performs  some  oversight functions to Insure that
established standards and guidance are followed.

     Within the  framework  of  applicable  legislation,  EPA's   radiation  program
strategy is to:

     1.  Establish  radiation  standards  and  guidance  that result in  regulatory
         controls which  promise  the greatest  reduction  1n adverse  health  effects
         and environmental impacts;

     2.  Maintain  a   capability  to  assess  and  quantify existing  and  emerging
         radiation problems  and the potential impact of  technologies  under devel-
         opment;

     3.  Evaluate  and  respond to  issues   of  serious  public   concern,  and  point
         out situations  where  corrective  action  is  the  responsibility of  other
         agencies; and

     4.  Maintain a  capability to  respond  to  emergencies  and  to  aid development
         and testing   of  State, local,  and  Federal  plans  for  emergency response.

     Within this general strategy, highest priorities have been given to activities
mandated by  the Clean  Air  Act of  1977,  radioactive waste management activities,
completion of  Federal  Guidance currently  under development,  and testing of  State
radiological emergency response plans.

     The emphasis on the Clean Air Act activities is consistent with public  concern
over radiation, the existence  of a significant  number of poorly defined and uncon-
trolled sources which emit radioactive air pollutants, and the court decision  man-
dating EPA action on airborne radlonucTides.

     EPA's role in the  control  of radioactive waste  disposal is prescribed in the
Nuclear Waste  Policy Act,  the Uranium Mill Tailings Radiation  Control Act,  and by
the Interagency Review Group on Nuclear Waste Management.  Areas covered by Federal
Guidance currently under  development include  general  occupational  exposure, radio-
frequency exposure and  protective  action guides  for accidental release.   EPA re-
sponsibilities  for  review  and testing  of  emergency  response plans,  monitoring
Three Mile Island, and Protective Action Guides are specified in regulations issued
by the Federal  Emergency Management Agency 1n March 1982.
                                         R-3

-------
     EPA's radiation health  research  program has been focused on  research  to sup-
port the issuance, in late 1984, of Federal Radiation  Protection Guidance for radio-
frequency and microwave  radiation.   Since  development of these environmental expo-
sure guidelines is nearing completion, an  orderly  phase-out  of the health  research
program will  begin  in  1983.   A health assessment  document,  Biological  Effects of
Radio frequency Rad'iatign. will   be a  companion document  to the  Guidance   Inci  Ts
b₯ing ^coipleted in 1983,  As  such,  no  resources have  been requested for the health
effect program in 1984.  The  off-site  monitoring program,  conducted to  support the
Department of Energy's  operation  of nuclear  test sites,  and  the  quality assurance
program for radiochemical analyses  will  be maintained at the same level  of effort.
                                          R-4

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                               1984 Budget Estimate
                                Table pf Contents

                                                                          Page
RADIATION
    RESEARCH & DEVELOPMENT
       Nonionizing Radiation..	  R-6
                                     R-5

-------
                                      RADIATION

                                 Nonionizing Radiation
                                ACTUAL   BUDGET
                                  1982    ESTIMATE
                                            1983
                     CURRENT
                     EST MATE
                       1983
                 ESTIMATE  INCREASE +
                   1984    DECREASE -
                          1984 VS 1983
 PROGRAM
 Technical  Information  &
 Liaison
  Salaries  &  Expenses
  Research  &  Development
                        TOTAL
 Monitoring  Systems &
 Quality  Assurance
  Salaries & Expenses
  Research 4 Development
                        TOTAL
 Health Effects
  Salaries  4  Expenses
  Research  &  Development
                        TOTAL
 TOTAL:
  Salaries &  Expenses
  Research 4  Development
                                 (DOLLARS  IN THOUSANDS)
   155.1
     $.9
   $56.0
$10.7

$10.7
   $84.4     $174.6     $174.6
   $15.4      S16.7      $16.7
   •$99.8     $191.3     1191.3
SI,532.5   $1,163.5   $1,163.5
  $901.2     $220.9     $370.9
$2,433.7   $1,384.4   $1,534.4
$1,672.0   $1,348,8   $1,338.1
  $917.5     $237.6     $387.6
                     $216.4     S41.8
                      .$16.7
                     S233.1     .$41.8
                            -$1,163.5
                              -$:370.9
                            -SI,534.4
                     $216.4 -$1,121.7
                      $16.7   -$370.9
 Nonionizing  Radiation   TOTAL    $2,589.5    $1,586.4    $1,725.7      $233.1 -$1,492.6
 PERMANENT WORK YEARS
 Technical  Information  &
 Liaison

 Monitoring  Systems  &
 Quality  Assurance

•Health Effects

 TOTAL  PERMANENT WORK YEARS
.9
2.0
22.7
25.6

5.0
16.0
21.0

5.0
16.0
21.0
                                      5.0
                                      5.0
                                -16.0

                                -16.0
 TOTAL  WORKYEARS
 Technical  Information  4
 Liaison

 Monitoring  Systems 4
 Quality  Assurance

 Health Effects

 TOTAL WORKYEARS
      .9


     2.0


    27.4

    30.3
  5.0


 2Q.4

 25.4
 5.0


20.4

25.4
5.0
5.0
-20.4

-20.4
                                        R-6

-------
                                       RADIATION
                                 Nonionizing Radiation
                                         Actual
                                          1982
                                          7/82
Major Outputs/Milestones

Conduct Off-Site Radiological
Monitoring and Surveillance
Program.

-  Provide annual  reports on
   off-site surveillance in
   previous calendar year.
   (Monitoring)

Conduct an Analytical Radio-
chemical Quality Assurance Program.
-  Report on each laboratory              9/82
   quality assurance inter-
   comparison study as completed.
   (Monitoring)

Support Issuance of 1984 Radio-
frequency Guidance

-  Provide comprehensive health
   assessment document, BjpiQjlcal.
   Effects of Radiofrequericy
   Radiation, as part of documenta-
   tion for deve 1 opinent of  environ-
   mental  exposure guidelines.
   (Health)

-  Present paper on the develop-
   ment of a mathematical model to
   predict the absorption of elec-
   tromagnetic energy and the
   body's resultant thermophysio-
   logic response. (Health)

-  Provide data on the behavioral         1/83
   effects of ciicrowave radiation
   exposure, based on a workshop to
   evaluate discrepancies in the
   behavioral bioeffects data base,
   the divergence between various
   international standards, and the
   potential effects on human
   behavior. (Health)

-  Provide data on the Interaction        9/82
   of various microwave radiation
   frequencies with key pathways for
   brain energy metabolism. (Health)

-  Evaluate growth stunting and body      7/82
   weight reductions in young mice
   exposed to 2450 MH£ microwave
   radiation in utero. (Health)
 Current
Estimate
  1983
  7/83
Estimate
  1984
  7/84
                                                           9/83
                   9/84
                                                           9/83
                                                           6/83
                                         R-7

-------
                                       RADIATION
Major Outputs/Ml 1estones

   Provide data on the immune
   responsiveness  of mice
   irradiated with continuous
   -wave or pulse-modulated
   425 MHz radiofrequency
   radiation. (Health)

-  Measure blood-brain barrier
   permeation in  rats during expo-
   sure to 2450 MHz microwave
   radiation. (Health)
Nonionizing Radiation


        Actual
         1982

        12/82
 Current
Estimate
  1983
Estimate
  1984
         9/82
                                         R-8

-------
                                       RADIATION


                                 Nonionizing Radiation
BudgetRequest
     The Agency requests  a  total  of  $233,100 and  5.0  permanent  workyears  for 1984,
a decrease of  $1,492,600  and 16.0 permanent workyears from  1983.   Included 1n the
total is 5216,400  for  Salaries  and Expenses and  $16,700  for Research  and Develop-
ment, with  decreases  of  $1,121,700  and  $370.,9.00,  respectively.   This  decrease
occurs in the health effects program element.

Program Description

     The overall goal  of  the research  and  development program in  radiation  is to
provide Agency decision-makers,  and other Federal,  Regional,  State  and local  offi-
cials with scientifically credible data on effects,  methodologies, relationships,
models and assessments  which  they  require to control  and to assess public exposure
to nonionizing  radiation  (NIR)  and to man-made radioactive materials  in  the  envi-
ronment.  The following objectives support these goals:

     Objective 1.  Conduct Off-Site  Radiological  Monitoring  and Surveillance Pro-
gram.The program  under  this objective provides  comprehensive radiological  moni-
toring and  surveillance  services  to  meet  specific  Department of   Energy  (DOE)
requirements for its nuclear  testing  programs, especially at the Nevada  Test Site
(UTS).  This work is conducted under a reimbursable arrangement with DOE.

     Objective 2.  Conduct an Analytical  Radiochemical Quality Assurance  Program.
A qua 1 i ty assiirance  fQA!program  Ts~ SoriductSd'fii sUpporlf"of' FeSeraT^  RejjfSnaT,
State, and local laboratories which assesses radionuclide activities in air, water,
milk, and food  to  determine the impact of local  nuclear facility activities.  The
QA program  supports the  Office  of Radiation  Programs by  serving  as  a  source of
radionuclide and instrument standards  and  radiochentical methods  for analysis  of
environmental samples.

     Objective 3.  Support Issuance of 1984 Radiofrequency Guidance.  The  research
under this objective provides support to the Office  of  RadlatiOff Programs for the
1984 issuance  of  Federal  Radiation  Protection  Guidance  for  radiofrequency  and
microwave radiation*

TECHNICAL INFORMATION AND  LIAISON
1982 Accomplishments

     In 1982,  the  Agency obligated  a  total  of  $56,000  for this program  of  which
$55,100 was under  the  Salaries and Expenses appropriation  and  $900  was  for extra-
mural purposes under  the Research  and Development appropriation.   This  activity,
which supports  research  programs   across  all  media,  was  consolidated   into  the
Intermedia program  in  1983.  Thus,  the  Program Description,  19.84 Pr^rjm Request,
1983 Program, and 1982 Accomplishments narrative, sections appear there.

MONITORING SYSTEMS; AMD QyALITY ASSURANCE

1984 Program Request

     The Agency requests  a  total  of $233,100 and  5.0  permanent workyears for this
program, of which $216,400 is for Salaries and Expenses and $16,700 is for Research
and Development.  This represents no substantial change from 1983.
                                          R-9

-------
     Conduct Off-Site Radiological Monitoring and  Survei'1 lance Program.    National
nuclear testing activities must be conducted  in a way that does not adversely impact
the health and safety of  the population or the quality of the environment.   To assure
this requires comprehensive environmental monitoring and surveillance capabilities.
The Environmental Protection Agency  (EPA) .will provide these capabilities  to support
DOE nuclear  test  activities.   EPA is an active participant  in  the decision-making
process when  tests  are  instituted  and  serves  on  the  test  controller's  advisory
panel.  This  panel  advises  the DOE  test controller  on  whether it  is  advisable to
initiate a  test.   At  each  test, radiation  safety  and monitoring  teams  will  be
deployed to  document  environmental  levels  of radioactivity and to  be  prepared for
remedial action in the event of accidental  releases.

     Conduct a,n Analytical Radiochemical Qua]ity Assurance Program.  Standard  ref-
erence materials  anHlaboratory  audits  are   necessary  to  support  the  quality
assurance aspects of the environmental  radiation monitoring programs being conducted
by program offices, Regions, States, nuclear facilities, and contract laboratories.
Over 200  of these  organizations routinely  make  radiation measurements which are
reported to various local, State, and Federal agencies.   This research program rill
provide technical expertise  and  guidance  to those laboratories  for  radiochemical
analyses of  environmental samples.   Laboratory  intercpmparison  studies are focused
on the  accuracy  and  precision  of measurements of  radioactivity in milk,  simulated
diet, drinking water,  urine, and air filters.  These data will be  used  in assess-
ments of population exposures to radiation.  At least 11 laboratory intercomparison
studies will be conducted in 1984.  The integrity of standards  or reference materials
are ensured through continuing  radionuclide  traceability  studies  with the  National
Bureau of Standards (NBS) and a repository for NBS-certified radionuclide standards
will be maintained.   The specific radionuclides  have not yet been selected for 1984.

1983 Program   -

     In 1983, the Agency  is  allocating a total  of 3191,300 and 5.0 permanent work-
years for this program of which $174,600  is  under the  Salaries and Expenses appro-
priation and $16,700 is  for  extramural  purposes  under  the Research and Development
appropriation.

     Conduct Off-Site Radiological Monitoring and Surveillance Program.    The off-
site monitoring  and  surveillance program  at the  Nevada  Test  Site and at  former
sites of nuclear tests is continuing at the request of  the DOE.  Testing  in 1983 is
anticipated to continue at the same or a greater rate than in 1982.

     Conduct an Analytical Radiochemical Quality Assurance Program.    In 1983, 11
laboratory intercomparisonstudiesaTebeingconducted  inthe  quality  assurance
program for  samples  of  food,  milk,  urine, and air.  About 400  radionucli.de  stand-
ards and reference materials maintained under the repository program are  planned to
be distributed  to  Federal,   State,  and  local  laboratories involved  in  monitoring
radiation in the environment.

1983 Explanation of Changes from Budget Estimate

     There is no change from the Budget Estimate.

j.982 AccompVishments

     In 1982, the Agency  obligated  a  total  of  599,800  for this program,  of which
584,400 was  under the  Salaries  and  Expenses  appropriation  and  515,400  was  for
extramural  purposes under the Research and Development appropriation.

     Conduct Of f-Si te  Radio! ogical  Moni to ringand, Survei 11 ance Program.   EPA  pro-
v1 ded environmental  monitoring  and  surveillance'services'to OOE  and participated
in 22 nuclear  tests at  the  Nevada-Test  Site  in  1982.   In   addition, a  community
monitoring program Involving 15-communities  was  initiated in 1982 as  a cooperative
effort between  EPA,  DOE, and  the Desert Research  Institute  of the  University of
Nevada at Las Vegas.
                                         R-10

-------
     Conduct ari Analytical Radiochemical  Qua!it-y Assurance Program.   In  1.982,   the
qua!ity= a₯surinee  program conducted  eight laboratory  intercamparison studies  on
strontium and  gamma  emitters  in  milk and  simulated  diet  samples,  on tritium  in
urine samples, and on gross alpha and beta activities, cesium 137, and strontium 90
for air filters.   In  the  repository program for NBS-certified  radionuclide  stand-
ards, approximately 400 standards and  reference  materials were distributed to  pri-
vate, State,  and  nuclear  facility  laboratories,   The radionuclides  submitted  for
traceabillty study to NBS in 1982 were thorium  230,  carbon 14,  nickel 63,  silver
110, scandium 46, and chromium 51.

HEALTH EFFECTS

1984 Program Request

     No resources  have  been requested  for the nonionizing  radiation (MIR)  health
effects program in 1984.  This program has been  focused  on  research  to support the
issuance of  the  1984  Federal  Radiation  Protection  Guidance  for  radiofrequency
and microwave radiation.   Since development of these  environmental  exposure  guide-
lines will  be completed  in 1984,  no additional  health research  will  be  needed
for incorporation in the  guidelines and the program will be closed out.

1983Program

     In 1983, the  Agency  is  allocating  4 total  of 51,534,400 and  16.0  permanent
workyears to this  program,  of  which $1,163,500 is  under the Salaries and  Expenses
appropriation and  5370,900  is for  extramural  purposes  under  the  Research  and
Development appropriation.

     Support Issuance of  1934 Radiofrequency Guidance.  Program activities  in  1983
are geared to complete  development of environmental  exposure  guidance for  radio-
frequency radiation, scheduled to be Issued in 1984.  A health  assessment document,
Biological Effects of Radiofrequency Radiation, is  being  completed  to  accompany
the FederalRadiation Protection  Guidance.This  document provides  a comprehensive *
and critical evaluation of scientific  data available on  the biological  effects  of
exposure to  radiofrequency  radiation.  The  available  data largely  addresses  the
risks of select frequencies  of continuous wave NIR and the average  whole-body  rate
of energy absorption.

1983 Explanation of Changej from BudjetL Estimate^

     The net increase of +$150,000 results from the following action:
     -Congressional Action.  (+$150,000)  Congress added +$8,526,200 to the Research
and Development  appropriation  for  priority  activities  at  the  discretion  of  the
Agency.  This  specific  increase  supports nonlonizing   radiation health  -effects.

1982 Accomplishments

     In 1982, the Agency obligated a total of $2,433,600 for this program,  of which
51,532,400 was under the  Salaries and Expenses appropriation  and $901,200 was  for
extramural purposes under the Research and Development appropriation.

     Support Issuance of .1984 Radiofrequency^Guidance.  In  1982,  results  of   re-
search on" the"effects of  repeated in 'utero exposure of  mice to 2450 MHz continuous
wave radiation were  reported.   Confirming earlier  studies,  decreased fetal  weight
(stunting) was demonstrated  through the  first week  after birth and found to.be
associated with delayed skeletal maturation.   Measurements were made on the permea-
tion of radioactive  tracers  across  the blood-brain barrier of adult rats exposed
to 2450 MHz  radiation  at  varied  power densities  (incident exposure)  and  ambient
environmental  temperatures.  After  correcting  the data  for thermal  effects  of  the
microwave radiation,  no   significant  increase  in,  permeation  was found.   Results
were reported on work to  examine  whether  key  biochemical? 1n the energy production
system of  the  rat  brain  are  affected  directly  by  microwaves  or  indirectly  by
                                         R-ll

-------
tissue hyperthemiia.  The dependence  of  effects on  frequency  and wave modulation
was also  examined.   The  data  indicated  frequency  specific  inhibition  of  brain
energy metabolism,  supporting  the  hypothesis  that  microwave  radiation  directly,
rather than by  tissue  heating,  inhibits  mitochondria!  energy production  pathways
in the  rat  brain.  Effects were  noted  at 591  MHz and  200  MHz,  but these  effects
were different..    No effects were  noted  at 2450 MHz.  The immune responsiveness of
mice irradiated  with continuous  wave  or pulse-modulated 425 MHz (radar)  radiation
was assessed.    No differences  between  the  control  group  and  the two irradiated
groups were observed for several  measures  of  immune response.
                                         R-12

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
RADIATION
    ABATEMENT & CONTROL
       Radiation Criteria, Standards 8 Guidelines	 R-14
       Radiation Program Implementation	 R-17
       Radiation Environmental  Impact Assessment	 R-20
                                      R-13

-------
                                      RADIATION

                      Radiation Criteria, Standards 4 Guidelines
                                       /
                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           198.3       1983             1984  VS 1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Radiation Criteria,
Standards 4 Guidelines
 Salaries & Expenses           $1,733.8   $3,167.8   $3,626.6   $3,870.0     $243.4
 Abatement Control  *           $2,604.9   $1,595.7   $1,595.7   $2,495.7     $9,00.0
 Compliance
                       TOTAL   $4,338.7   $4,763.5   $5,222.3   $6,365.7   $1,143.4

TOTAL:
 Salaries & Expenses           $1,733.8   $3,167.8   $3,626.6   $3,870.0     $243.4
 Abatement Control  .4           $2,604.9   $1,595.7   $1,595.7   $2,495.7     $900.0
 Compliance

Radiation Criteria,    TOTAL   $4,338.7   $4,763.5   $5,222.3   $6,365.7   $1,143.4
Standards 4 Guidelines


PERMANENT WORKYEARS
Radiation Criteria,                35.7       55.2       68.2       65.0       -3.2
Standards 4 Guidelines

TOTAL PERMANENT WORKYEARS          35.7       55.2       68.2   .    65.0       -3.2


TOTAL WORKYEARS
Radiation Criteria,                39.0       65.4       77.7       74.3      -3.4
Standards 4 Guidelines

TOTAL WORKYEARS                    39.0       65.4       77.7       74.3      -3.4
                                         R-14

-------
                                     RADIATION


                    Radiation Criteria, Standards, and Guidelines
Budget Request
     The Agency  requests  a total  of  $6,365,700 and  6.5.0 permanent workyears  for
1984, an increase of $1,143,400 and a  decrease of 3.2  permanent workyears from 1983.
Included in this  total  is .53,87.0,000  for Salaries and  Expenses  and $2,495,700  for
Abatement, Control and Compliance,  with an increase of 5243,400 and 5900,000 respec-
tively.

Program Description

     Radiation environmental  standards  and  .guidelines  are  developed   and  promul-
gated under this  subactivity.  These  standards  and  guidelines  protect the public
health and the environment by minimizing  risk of radiation  exposures  from nuclear
energy applications, naturally occurring radioactive materials, medical and occupa-
tional radiation exposure and non-ionizing radiation.

RADIATION CRITERIA, STANDARDS. AND GUIDELINES

1984 Program Request

     The Agency  requests  a total  of  56,365,700 and  65.0 permanent workyears  for
this program,   of  which 53,870,000  is  for the Salaries and  Expenses appropriation
and 52,495,700 is  for the  Abatement,  Control and  Compliance  appropriation.   This
represents an   increase  of $243,400  and  5900,000  respectively  from 1983.   The
increase in Salaries  and  Expenses  is  associated with an  increase  in personnel  and
operating costs.   The  increase in  extramural  expenses  will  provide more  contract
support for  regulatory  analysis  related  primarily  to  radionuclide  activities.

     Work in  1984 will  concentrate on  three major  areas  of  regulatory  effort:
airborne radionuclides, radioactive waste management,  and  Federal Guidance.  Atten-
tion will  also  be devoted  to the mandated  review  of the environmental  standards,
for normal operations  in  the uranium fuel  cycle  (40 CFR 190).   Airborne  radionu-
elides efforts will  concentrate on bringing to  final  action  proposals made  under
court order in   1983.   Because of  the  highly accelerated schedule  which  requires
proposal 180 "days  from the  court order, until public  comments are received,  the
amount of  effort  and the  precise  schedule  for final  action is  uncertain.   Major
progress on this  regulatory effort will  remain a  high priority for this program in
1984,  It  is  anticipated  that  the high level waste  standard will  be promulgated
in accordance   with  the Nuclear  Waste  Policy  Act.  The generic standard  for land
disposal of low  level  waste will  be proposed  before  the  end of 1984.   Anticipated
permit requests  from  other federal agencies for disposal  of low level wastes  in
the ocean will  be reviewed and a determination made on the adequacy of  each request
based on existing evaluation  criteria.   Generic criteria  for  ocean  disposal  sites
of low  level  radioactive wastes  will  be completed  and  development of monitoring
criteria started.  Full-scale initiation;of standards  development for decommissioned
nuclear facilities will be undertaken.

     Public hearings  for  the  proposed Federal Guidance for  non-ionizing radiation
in the  radiofrequency  range  will  be  held,  and  completion  of  this regulation  is
anticipated.  Work  will   continue  on  the  issuance  of  Protective  Action  Guides
for decontamination  and  reentry   of  areas  contaminated   in radiation  incidents.

1983 Program

     In 1983,   the  Agency  is  allocating  a  total  of 55,222,300  and  68.2 permanent
workyears for this program,  of which $3,626,600  is  for  Salaries  and  Expenses  and
SI,595,700 is   for Abatement,  Control  and  Compliance.    During  1983,   efforts  are
concentrated in three areas;   regulation  of  radionuclides under  Section 112 of the
Clean Air  Act;  management  of  radioactive   waste  under  the generally  applicable
                                        R-15

-------
environmental standards  authority  of the  Atomic  Energy Act  and the  Uranium  Mill
Tailings Radiation  Control   Act;  and  development  of  Federal  radiation  guidance
under the provisions of  the  Atomic  Energy  Act.   Clean Air Act efforts are directed
towards meeting the court order  requiring  EPA to  propose all  airborne radionuclide
standards within  180  days.    Other  radioactive waste  disposal program  activities
include:  proposal of  the high  level  waste standard, promulgation  of uranium  mill
tailing standards  for  inactive   sites,  and .anticipated  proposal  of  standards  for
active sites.   Under   development  in 1983  are generic  waste  standards  for  land
disposal of  low  level  waste. Final guidance for general  occupational  exposure to
radiation is  expected  to be  completed  under the  Federal  Guidance  authority;  an.d
guidance for exposure to non-ionizing radiation in the radiofrequency range will be
proposed.  Work  necessary to issue Protective Action  Guides  will  resume  in 1983.
EPA and other Federal  agencies will  work together  to assure adequate implementation
of existing regulations.

1983 Explanation of Changes  from Budget Estimate

     The net increase of +$458,800 results from the following action:

     -Congressiona 1 Action.   (+$458,800) This  increase  includes  +5458,800  of  the
$10.5 Sill ion" Salaries and Expenses add-on which supports workyears in the develop-
ment of radionuclides standards.

1982 Accomplishments

     In 1982, the Agency obligated $4,3.38,700 for  this program, of which $1,733,800
was for Salaries and Expenses and $2,604,900 was for Abatement, Control and Compli*
ance.  Contract funds  supported  the gathering  of  data  and analysis  in  support of
standards setting, particularly  in  the  areas of airborne  radionuclides  and radio-
active waste disposal.   This  work  has led  to  the  proposal  of  the high level  radio-
active waste standards  and promulgation  of  uranium  mill  tailings  standards for in-
active sites.   Work  continued   on  uranium  mill   tailings   standards  for  active
sites, disposal  standards for low level wastes, guidance  for general  occupational
radiation exposure, and  guidance  to limit exposure  to  radiofrequency non-ionizing
radiation.  Work  on  development  of hazardous air pollution  standards  for airborne
radionuclides was accelerated in response to a court order.
                                         R-16

-------
                                      RADIATION

                        Radiation Program Implementation

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984     DECREASE  -
                                           1983       1983             1984 VS 1983
(DOLLARS IN THOUSANDS)
PROGRAM
Radiation Program
Implementation
Salaries & Expenses
TOTAL
TOTAL:
Salaries A Expenses
Radiation Program TOTAL
$629.1
$629.1
$629.1
$629.1
$628.6
S628.6
$628 .6
$628.6
$602.7
$602.7
$602.7
$602.7
$716.7
$716.7
$716.7
$716.7
$114,0
S114.0
$114.0
$114.0
Implementation
PERMANENT WORKYEARS
Radiation Program
Implementation

TOTAL PERMANENT WORKYEARS
12,9
12.9
10.0
10.0
10.0
10.0
10.0
10.0
TOTAL WORKYEARS
Radiation Program
Implementation

TOTAL WORKYEARS
14.2
14.2
11.1
11.1
11.1
11.1
11.1
11.1
                                        R-17

-------
                                      RADIATION


                           Radiation Program Implementation
Budget Request
     The Agency requests a total  of $716,700 and 10.0 permanent workyears for 1984,
an increase  of Jl14,000  from  1983, all  of which  is  for  Salaries  and Expenses.

Pro9ram Description

     This subactlvity  supports activities  of  EPA's  Regional  offices  including:
reviewing environmental  impact  statements  (e.g.,  lightwater  reactors and  uranium
mining and  milling);   providing the public with  technical  information; providing
direct assistance to  State  and local  governments  with 'special  radiation problems
of a short-term  nature;  participation  in  the reviewing and  testing  of State radio-
logical emergency  response  plans;  and  providing the  radiological  expertise needed
by the Regions to  manage radiological  problems associated with  the  drinking water
and hazardous waste programs,

RADIATION PROGRAM IMPLEMENTATION

1984 Program Request

     The Agency requests  a  total of $716,700 and 10.0 permanent  workyears for this
program, all of  which  is for the  Salaries and  Expenses appropriation.  This repre-
sents an increase  of $114,000  from 4983  reflecting  increased  personnel  and  operat-
ing costs.  A  major  emphasis for  the 1984 Regional  program is technical  assistance
to States in the  area  of emergency  response planning.  EPA assists  States  in the
development of radiological  emergency  response plans  and  formally  reviews these
plans along  with other  Federal  agencies  under" the  coordination  of the  Federal
Emergency Management Agency.  Regions  will  continue to be  Involved  1n  the  charac-
terization and identification  of   hazardous radioactive waste sites.  This  effort
supports both  the  EPA headquarters  hazardous  waste  programs  and the  requests  of
the States.  The Regions  will  continue  to be the  primary  reviewer of  environ-
mental  Impact  statements  for  radiation  facilities,  such as  commercial  nuclear
power plants,  uranium  mines  and  mills, and radioactive waste  disposal   facilities.
Other areas of special  concern to  Regions will be assistance "in the implementation
of the  uranium mill  tailings  standards  1n those  Regions  affected  and continued
support to  the  States,  particularly  for  the  management  of  radioactive  wastes.

1983Program

     In 1983,  the Agency  1s  allocating  a total  of  $602,700  and  10.0 permanent
workyears for  this  program,  all  of  which  is  for Salaries  and  Expenses.  In 1983,
emergency preparedness and technical assistance to the States  on  radioactive waste
problems remains the central focus of the EPA Regional radiation program.

1983 Explanation of Changes from BudgetEstimate

     The net decrease of -$25,900  results from  the following action:

     -Reprog£amm1rigs.  (-$25,900)    During  the   development, of the  operating "plan,
s e ve r a1 r e p ra g r ainmTh gs were  made   to this  activity  which  are  not  reportable under
the Congressional  reprpgramming  limitations.   These  changes  resulted   in  a  net
decrease of -$25,900 to  the Salaries and Expenses appropriation.
                                        R-18

-------
1962 Accomplisnroents

     In 1982, the  Agency  obligated  $629,100  for this  program,  all  of  which was
for Salaries  and Expenses.    Emergency  preparedness  and  technical  assistance  to the
States and other  EPA Regional  programs  remained the  central  focus of the EPA Re-
gional radiation program.
                                        R-19

-------
                                      RADIATION

                      Radiation Environmental Impact Assessment

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983 .      1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Radiation Environmental
Impact Assessment
 Salaries 4 Expenses           $4,395.8   $2,772.6   $2,772.6   $2,93.9.3    $166.7
 Abatement Control  S             $382.3     $600.0     $600.0     $600.0
 Compliance
                       TOTAL   $4,778.1   $3,372.6   $3,372.6   $3,539.3    $166.7

TOTAL:
 Salaries 4 Expenses           $4,395.8   $2,772.6   $2,772.6   $2,939.3    $166.7
 Abatement Control  4             $382.3     $600.0     $600.0     $600.0
 Compliance

Radiation              TOTAL   $4,778.1   $3,372.6   $3,372.6   $3,539.3    $166..?
Environmental impact
Assessment
PERMANENT WORKYEARS
Radiation Environmental            7.6.1       48.9       48.9       46.9      -2.0
Impact Assessment

TOTAL PERMANENT WORKYEARS          76.1       48.9       48.9       46.9      -2.0


TOTAL WORKYEARS
Radiation Environmental            86.1       58.0       58.0       56.0      -2.0
Impact Assessment

TOTAL WORKYEARS                    86.1       58.0       58.0       56.0      -2.0
                                         R-20

-------
                                      RADIATION


                      Radiation Environmental  Impact Assessment


Budget Request

     The Agency  requests  a total  of  53,539,300 and  46.9 permanent workyears  for
1984, art increase of $166,700 and a decrease of  2.0 permanent  workyears  from 1983.
Included in  this  total  is 52,939,300  for Salaries and  Expenses and  $600,000  for
Abatement, Control and Compliance.

Program Description

     Activities in  this  area  provide the  information  necessary  to  identify  and
analyze potential radiological  health problems having public  health impact  and to
support the development of standards  and guidelines.  Also  encompassed  under this
subactivity is  the  monitoring  of  environmental  radiation,  as well as  laboratory
analysis, technology assessments,  emergency preparedness, and  emergency  response.

.RADIATION ENVIRONMENTAL IMPACT ASSESSMENT

1984 ProgramRequest

     The Agency  requests  a total  of  $3,539,300 and  46.9 permanent workyears  for
this program,  of which 52,939,300 is for  Salaries and  Expenses  and 5600,000 is
for Abatement,  Control and Compliance.   This  represents  an increase of $166,700 in
Salaries and Expenses reflecting  increased  payroll  and  operating costs.   In 1984,
this program will continue to  support development  of  standards under the Clean Air
Act and the  Nuclear  Waste  Policy Act  and the management  of  radioactive  wastes.  A
fully equipped  emergency   response capability  will   be  maintained  and  off-site
monitoring of  the Three  Mile Island  nuclear  reactor  will continue.   The Environ-
mental Radiation  Ambient   Monitoring  System will  collect and  analyze samples  of
air, precipitation,  and  milk in its  national  network to  determine  ambient  radia-
tion levels  and will maintain  its preparedness to monitor  the environment  in the
event of  atmospheric  testing  of  nuclear devices.   The   quality assurance  program
will be operated to ensure  accuracy of all laboratory measurements and data analyses
conducted either  in-house  or throeigh program  contracts.   In  addition,  support to
States, other  Federal agencies,  and  other parts of  EPA   will  continue in the form
of radiochemical  anaylses, technical   assistance,  occasional  loans of  equipment,
and EPA  participation  .in  the  National  Conference  of  Radiation   Control  Program
Directors.  As  a  part of  the  Ocean  Disposal  program, marketplace  seafood  surveys
in the Boston area will  be continued.

1983Program

     In 1983,  the  Agency   is  allocating  a  total  of $3,372,600  and 48.9 permanent
workyears for  this  program,  of which  52,772,600 is  for  Salaries  and  Expenses and
$600,000 is  for  Abatement,   Control  and  Compliance.   Activities  include:   con-
tinued laboratory  and technical  support1 to  standards-setting, maintenance  of an
emergency response  capability,  coordination  of the  Regions  in  their  review  and
testing of State  emergency response  plans,  assistance to  other EPA offices  and to
State radiological  programs,  and  support  for  the Environmental Radiation  Ambient
Monitoring System.   The  radium collection  and repository program  will  be  discon-
tinued this  year and the  radium previously collected  shipped for  permanent dis-
posal.  Ocean  disposal  monitoring  activities   will  continue  with  our  participa-
tion in the  Massachusetts  Bay and marketplace seafood surveys.  The monitoring of
off-site releases  at Three Mile  Island  will  al.so  continue.   Additional work  "in-
cludes completion of the   field  work  on  the Butte, Montana  radon  survey and con-
tinued operation of  a program-wide quality  assurance  plan.  Several changes in the
1983 program  reflect a  shift  in  emphasis  from field  work  to  standards-setting
                                        R-21

-------
activities, including a reduction  in  emergency preparedness  activities  as  Regional
guidance and  equipment  acouistion  are  completed,  an  increase  in  resources  for
Clean Air  Act work  necessary to  meet  the  proposed  regulatory  schedules,  and  a
decrease in the Sutte study as the field work is completed.

1983 Explanation of Changes from BudgetEstimate

     There is no change to this program.

1982 Accpmplishments

     In 1982, the Agency obligated $4,778,100 for this program, of which S4,395,800
was for Salaries and  Expenses and $382,300 was for Abatement, Control  and Compli-
ance.  Contract funds supported  monitoring activities at Three Mile Island and the
ocean disposal survey of Massachusetts Bay.  Activities in 1982 included.: continued
laboratory and technical support to standards-setting,  maintenance  of ah emergency
response capability,  coordination  of  the  Regions  in  their  review and  testing of
State emergency response  plans,  and assistance to  other  EPA offices and  to  State
radiological programs.  The  Environmental  Radiation  Ambient Mentoring  System was
maintained as  was  the  radium collection  and  repository  program.  Ocean  disposal
monitoring activities  included  our participation  in  the   Massachusetts  Say  and
marketplace seafood  surveys.   Work on  the  Butte,  Montana  radon  survey  was  con^
ti.nued.  Operation  of  ,a  program-wide  quality  assurance program  was  initiated.
                                         R-22

-------
Noise
 SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents



                                                                            Page

NOISE                                                                       N-l

    ABATEMENT 4 CONTROL
       Environmental  Noise Strategies & Standards	  N-7
          Noise Standards Development............	  N-7
          Noise Control Technology Assessment 4 Criteria Development	  N-7
       Noise Program Implementation	  H-8
                                       N-l

-------
                                        NOISE

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
APPROPRIATIOH
                                (DOLLARS IN THOUSANDS)
 Salaries & Expenses
 Abatement Control 4
 Compliance

TOTAL, Noise
SI ,280.3
  S341.0
SI,621.3
PERMANENT WORK YEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
    21.2
    27.4
$6,616.0
$350.0   $1,707.0     $663.0  -$1,044.0
                                        N-2

-------
                                       NOISE


OVERVIEW AND  STRATEGY

     The 1982  noise  control  budget represented a major  policy change with respect
to  the  Federal effort, to  reduce  noise exposure.  As  reflected  in  that budget re-
quest,  the  EPA noise control program ,has  been  phased-out.   This decision resulted
from a  determination that the benefits  of noise control  are highly localized and
that the function  of noise control can  be adequately carried out at the State and
.local level without  the  presence of a  Federal program.

     States and  localities have  shown a .significant  increase 1n their ability and
desire  to  develop  their own noise control  programs.   During the last decade, over
1,300 municipalities and  24 States  have  enacted  noise control  legislation.   Of
these,  20  States have viable active  programs  and over  300  local  communities have
ongoing noise  control  programs   with active  enforcement.   This  dramatic  growth
(233% in  the  past   five  years)   convincingly demonstrates   that  State  and  local
governments can  and  will  deal  with  environmental  noise  problems  within  their
jurisdictions,

     The major components  of EPA's   noise  control   effort  were  promulgation  and
enforcement of Federal  noise regulations,  strengthening the capabilities of State
and local  noise  control  agencies  by  providing  technical and financial assistance,
and the conduct of noise  health effects  research.

     For 1982, activities  were structured  to achieve  a prompt but orderly phase-out
of  current  program  activities  by  transferring   to  the  State and  local  programs
knowledge and  experience  EPA has  gained.  This  Included  the  transfer  of  noise
measurement equipment  that will   aid  States and  local   governments  as  they  assume
additional responsibility,  and  the training  of  approximately 800  State  and local
personnel in  noise control techniques.

     Since most  final  phase-out activities of the Noise Control Program were near-
ing completion at the  end  of 1982, no resources  were  requested  for  this program in
1983, and no  resources are requested  for 1984.
                                                                          \  ,
                                         N-3

-------
                                        NOISE

                      Environmental  Noise Strategies 4 Standards

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Noise Standards
Development
 Salaries 4 Expenses
 Abatement Control 4
 Compliance
                       TOTAL
Noise Control
Technology Assessment 4
Criteria Development
 Salaries 4 Expenses
 Abatement Control 4
 Compliance
                       TOTAL

TOTAL:
 Salaries 4 Expenses
 Abatement Control 4
 Compliance

Environmental Noise    TOTAL
Strategies 4 Standards
  $437.0
  $163.3

  $600.3
  $843.3
  $149.3

  $992.6
$1,280.3
  $312.6
$1,592.9
PERMANENT WORKYEARS
Noise Standards
Development

Noise Control
Technology Assessment 4
Criteria Development

TOTAL PERMANENT WORKYEARS
     8.2


    13.0



    21.2
TOTAL WORKYEARS
Noise Standards
Development

Noise Control
Technology Assessment 4
Criteria Development

TOTAL WORKYEARS
     9.5


    17.9



    27.4
                                         N-4

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
NOISE
    ABATEMENT S CONTROL
       Environmental  Noise Strategies X Standards	  N-7
          Noise Standards Development	,	  N-7
          Noise Control Technology Assessment & Criteria Development	  N-7
       Noise Program Implementation	,	  N-8
                                       N-6

-------
                                       NOISE

                    Environmental  Noise Strategies and Standards
Budget Request
     Consistent with  the  Agency's  decision  to  phase-out  the  Noise  Program  in
1982, no resources are requested for 1984.
Program Description
     This program has been phased-out.
NOISESTANDARDSDEVEIOPMENT
1984 Program Request
     No resources are requested for this program in 1984.
1983 Program
     No resources were requested for this program In 1983.
1982 Accomplvshments
     In 1982,  the  Agency  obligated  $600,300  for  this  program,  of which  $437,000
was for Salaries and  Expenses  and $163,300  was for Abatement, Control  and Compli-
ance.  The program focused on regulatory phase-out operations, Including the clear-
ing of an incomplete regulatory agenda.  Noise studies and more than a half-million
publications were  sent  to States  and  localities  for  their  use.   Also,  fifty-six
on-site visits  were  made to  State and local  governments  to  provide  technical
assistance in strengthening their noise control programs.
NOISE CONTROL TECHNOLOGY ASSESSMENT AND CRITERIA DEVELOPMENT
                                               t
1984 Program Request
     No resources are requested for this program in 1984.
1983 Program
     No resources were requested for this program 1n 1983.
1982 Accomplishments
     In 1982, the Agency obligated 5992,600  for this program, of which $843,300 was
for Salaries and Expenses and  $149,300 was  for  Abatement, Control  and Compliance.
During 1982, the  Agency  concentrated  on the  completion  of  phase-out activities.
Health effects research studies as well as technology research projects were either
completed or transferred to other agencies for continuation.   The  results  of final
studies were made  available to the  scientific  community and  also to other  Federal,
State, and  local  governments  for incorporation  In their  noise control  efforts.
                                        N-7

-------
                                       NOISE

                            Noise Program Implementation
Budget Request
     Consistent with the Agency's  decision  to  phase-out  the  Noise  Program in 1982,
no resources are requested for 1984.
Program Description
     This program has been phased-out.
NOISE CONTROL^IMPLEMENTATION ANDEVALUATION
1984 Program Reques t
     No resources are requested for this program in 1984.
1983Program
     No resources were requested for this program in 1983.
1982 Accompli shments
     In 1982, the Agency  obligated  $28,400  for this program, all of which  was  for
Abatement, Control   and  Compliance.   Contract  funds  supported  completion  of  the
phase-out of the Noise Program.

-------

-------
Interdisciplinary
       SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL .PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
                                                                            Paoe

INTERDISCIPLINARY                                                           1-1
    RESEARCH « DEVELOPMENT
       Intermedia Program	  1-6
    ABATEMENT & CONTROL
       Federal  Agencies Compliance & NEPA Compliance*	,	 1-18
          NEPA Compliance	  1-19
          Federal  Agencies Compliance...,	  1-20
          New Source EIS Preparation.	,	  1-20
       Accelerated Review and Permitting	,	  I.-22
       Interdisciplinary Training Grants	  1-24
    ENFORCEMENT
       Enforcement Policy & Technical  Support	  1-27
          Technical  Support - Office of Legal 4  Enforcement Counsel.	  1-29
          Enforcement Policy 4 Operations...	  1-30
                                       1-1

-------
                                  INTERDISCIPLINARY

                                ACTUAL   BUDGET     CURRENT
                                 1982    ESTIMATE   ESTIMATE
                                           1983       1983
                                ESTIMATE  INCREASE +
                                  1984    DECREASE -
                                         1984 Y.S 1983
APPROPRIATION
                                (DOLLARS IN THOUSANDS)
 Salaries & Expenses
 Abatement Control  &
 Compl iance
 Research & Development

TOTAL, Interdisciplinary
$10,243.6  515,437.6  $17,573.5  $18,244.1     S670.6
 $2,142.5   $2,709,8   52,909.8   $7,049.4   $4,139.6

 54,542.8   $2,590.7   $3,452.6  $16,042.1  $12,589.5

$16,928.9  $20,738.1  $23,935.9  $41,335.6  $17,399.7
PERMANENT WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
    200.2
    243.9
 $6,616.0
 310.3
 363.7
$350.0
   325.6
   388.8
$1,707.0
 353.4       27.8
 396.5        7.7
$663.0  -$1,044.0
                                       1-2

-------
                                INTERDISCIPLINARY


OVERVIEW AND STRATEGY

     The Environmental Protection Agency's  (EPA)  Interdisciplinary  program  is  com-
posed of several  activities that  cut  across programmatic  lines  and  are  not  readily
assignable to  a  specific  media.   These  programs  address  environmental  concerns
that affect  several  media and  require  an  interdisciplinary  approach.   The Inter-
disciplinary program  includes the Intermedia  research program  within  the  Research
and Development  function,  the  Federal  Agencies  Compliance  and National  Environ-
mental Policy Act (NEPA) Compliance  programs within the Abatement and Control  func-
tion, and  components  of the Legal  and  Enforcement Counsel  program  within  the En-
forcement function.

     The goals  of the  Intermedia  research program are to;  (1)  identify and assess
long-term scientific  trends and  problems;   (2)  advance  the  state-of-the-art of the
Agency's scientific base;   (3)  develop  defensible methods to improve  the  Agency's
ability to perform cost benefit  analyses  of major regulations;  and (4) effectively
communicate the  technical  and scientific  information the  Office  of  Research  and
Development (QRD) has developed.

     The Federal  Agencies  Compliance  program   accomplishes  statutory  objectives
under the  authority  of the National  Environmental  Policy Act  (NEPA);  Section  309
of the  Clean  Air Act; and Executive  Order  12088 - Federal  Compliance  with Pollu-
tion Control Standards.   These laws require EPA to review and comment on proposed
actions of other  Federal  agencies to  ensure that public health  and the environment
are protected.   In addition,  Executive  Order 12088 directs  the  Agency to:  (1)  pro-
vide technical  advice and  assistance  to  Federal  agencies  to  ensure that  their
facilities comply  with pollution  control  requirements  in   a  cost-effective  and
timely manner;  (2) monitor all Federal facilities compliance with applicable pollu-
tion control requirements; (3) assist Federal  agencies and the Office of Management
and Budget (OMB) in developing budgetary plans for controlling pollution at Federal
facilities; and  (4)   resolve  disputes  regarding Federal  facilities violation  of
pollution control  requirements  through  the  administrative  mechanism  provided  by
the Order.  The  name  of this  program  element  was changed from Environmental Impact
Statement (EIS)  Review because  Federal  Agencies Compliance is  more descriptive  of
the range of Federal  agency projects and actions subject to  review.

     The NEPA  Compliance   program  element  is  responsible  for   preparing  its  own
Environmental Impact  Statements  (EISs)  or  alternatively, determining  Findings  of
No Significant  Impact,  on  National  Pollutant   Discharge Elimination  System  per-
mitting and  municipal  wastewater  treatment  grant  actions  to  assure  that  new
facilities with  federal involvement are planned, constructed  and operated pursuant
to Section 511 (c) of the Clean Water Act and NEPA.

     Enforcement Policy and  Operations provides'consistent  direction  to  EPA en-
forcement for all non-Superfund media to assure the Overall  quality of EPA enforce-
ment*  To accomplish  these goals, it  establishes strategies,  priorities, policies,
and procedural  guidelines  so  that  enforcement  actions  are  properly  selected and
prepared, and  1t assures  that  these  policies  are correctly  implemented  by  the
media enforcement  programs and   Regional   offices.   It  conducts   all  legal  case
development, litigation, and  adjudicatory hearing  activities  for media enforcement
programs; this  includes  oversight  of evidence  gathering, preparation  and  manage-
ment of cases,  and  referral  of cases to the  Department  of  Justice for litigation.
A special thrust in this subactivity is  the  Agency's criminal  investigations effort.
The program will investigate,  prepare, and refer cases involving criminal violations
of environmental  statutes.    Investigators  and  attorneys will  provide  support  to
the Department  of  Justice  during subsequent  investigation and  litigation  of th'ese
cases.
                                          1-3

-------
     The National   Enforcement  Investigations  Center  (KEIC)  in  Denver  provides
specialized technical   expertise  in  support of  EPA enforcement  case  preparation
activities.  NEIC  serves  as  a point  of  coordination and  support for  complex  In-
vestigations that have a national impact on EPA and  State  regulatory  programs.   In
1984, resources at NEIC are focused on support of  litigation  and  criminal  investi-
gations,  Previous responsibilities in compliance-related technical  assistance have
been returned to the media program offices  as  appropriate.
                                        1-4

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents


                                                                            Page

INTERDISCIPLINARY
    RESEARCH i DEVELOPMENT
       Intermedia Program	:	,	,,.,   1-6
                                      .1-5

-------
                                  INTERDISCIPLINARY

                                  Intermedia Program
                                ACTUAL
                                 1982
          BUDGET
          ESTIMATE
            1983
          CURRENT
          ESTIMATE
            1983
         ESTIMATE
           1984
    INCREASE +
    DECREASE -
   1984 VS 1983
                                (DOLLARS IN THOUSANDS)
PROGRAM
Exploratory Research
Core Program
 Salaries 4 Expenses
 Research & Development
                       TOTAL
$2,015.2   $1,622.0
$4,542.8   $2,590.7
$6,558.0   $4,212.7
Technical Information
Liaison
 Salaries X Expenses
 Research & Development
                       TOTAL
TOTAL:
 Salaries 4 Expenses
 Research & Development
$2,015.2
$4,542.8
$1,622.0
$2,590.7
           $1,798.1     $374.3 -$1,423.8
           $2,590.7  $15,173.9 512,583.2
           $4,388.8  $15,548.2 $11,159.4
                      $1,700.3   $1,727.2     $26.9
                        $861.9     $868.2      $6.3
                      $2,562.2   $2,595.4     $33.2
$3,498.4   $2,1:01.5 -$1,396.9
$3,452.6  $16,042.1 $12,589.5
Intermedia Program     TOTAL   $6,558.0   $4,212.7   $6,951.0  $18,143.6 511,192.6
PERMANENT WORK YEARS
Exploratory Research
Core Program

Technical Information 8
Liaison

TOTAL PERMANENT WORKYEARS
    27.0
    27.0
    12.1
    12.1
    16.5


    16.9


    33.4
 5.5     -11.0


17.0        .1


22.5     -10.9
TOTAL WORKYEARS
Exploratory Research
Core Program

Technical Information S
Liaison

TOTAL WORKYEARS
    35.2
    35.2
    16.0
    16.0
    20.4
                          28.5
    48.9
 7.4     -13.0
                          28.6
                           .1
36.0     -12.9
                                           1-6

-------
                                 INTERDISCIPLINARY
                                    Intermedia


                                                          Current
                                          Actual         Estimate       Estimate
Major Outputs/Milestones                   T_g82            1983           1984

Implement and Manage the
Exploratory Research Program

-  Develop a long-range strategy                           9/83           9/84

   Issue revised Grants program
   solicitation                           9/82             9/83           9/84 (N.SF)

-  Evaluate effectiveness of university                    6/83
   Centers program

-  Complete updating and documentation    9/82
   of Residual  Accounting Model

-  Complete series of special
   assessments
     -  Sun Belt Study                    4/82             4/83
     -  Mini-Assessments                                   6/83
     -  Region  I Outlook                                   8/83
     -  Biotechnologies                                    9/83
     -  Biological Trend Monitoring                        9/83
     -  Industrial Outlook                9/82             9/83

Develop and Validate Economic
Benefit Methodologies

-  Survey and assessment of methods for                    7/83
   .determining  the benefits of toxic
   substances and hazardous waste
   control

-  Reoorts on improved metho'ds for                                        8/84
   valuing the  economic benefits of
   health risk  valuation

Disseminate Technical Information/
Technology to States and Localities

-  Handbook on  Remedial  Actions at Waste
   Disposal  Sites                         6/82

-  Process Design Manual:  Oewatering of
   Municipal Wastewater Sludges           9/82

-  Handbook for Indentification and
   Correction of Typical Publicly Owned
   Treatment Works'  (POTW) Design
   Deficiencies                           4/82

-------
                                 INTERDISCIPLINARY
                                     Intermedia
Major Qutptits_/M'f1 estgnes

-  Manual:  Managing Asbestos in Schools
   and Other Public Buildings

-  Process Design Manual:  Land
   Applications of Sludge

-  Safety and Health Reference
   Manual  for Hazardous Waste Sites

-  Manual  on Ground Water Management
   of Public Water Supplies Threatened
   by Contamination.

-  Handbook on Volatile Organic Com-
   pound Monitoring Guidelines

-  Dissemination of capsule reports on
   Post-Construction Evaluations of
   Innovative Technology Projects
Actual
 1982
Current
Estimate
  1983
                 .8/83


                 6/83


                12/83



                12/83
Estimate
  1984
                12/83



                12/83


                 9/84



                 9/84
                                          1-8

-------
                                 INTERDISCIPLINARY


                                 Intermedia Program
BUDGET REQUEST

     The Agency requests  a  total  of $18,143,600  and  22.5 permanent workyears  for
1984, an increase  of  $11,192,600  and a decrease  of.10.9 permanent workyears  from
1983.  Included in this  total is $2,101,500 for Salaries and Expenses and 516,042,100
for Research  and  Development,  with  a  decrease  of  $1,396,900 and  an  increase  of
$12,589,500, respectively.  This is not an increase  in the total  budget;  rather,  it
reflects consolidation  of the Exploratory  Grants and  Centers  resources  into  the
Intermedia program; the  Exploratory  Research  Grants  and  Centers will   continue  at
the 1983 level of funding in 1984.   The decrease reflects a reduction  in the explo-
ratory research core program.

Program Descriptipn

     The role  of  the  Intermedia research  program is to:  (1) identify  and assess
long-term scientific trends  and problems;  (2) advance the state-of-the-art of  the
Agency's scientific knowledge in basic  research;  (3)  develop defensible  methods  to
inprove the Agency's ability to perform cost-benefit analyses of  major  regulations;
and (4) effectively communicate the technical and scientific  information the Office
of Research and Development (ORD)  has developed.  The program achieves  this through
the following objectives:

     Ob jectiyel^ _  Implement and  Manage the  Expl oratory  Research  Program-.   Th e
purpose of  this   objective   Tjf fo   support  Sission-orfentedj  Iong-term  research
designed to  strengthen   the  Agency's  environmental  science  and engineering  base
through grants to  individual  investigators  and  through  multidiscipline  university
Research Centers.

     Objective 2.  Develop and Validate Economic  Benefit  Methodologies,  The  pur^
pose of this objective is to provide tha  Agency  with the methodological  capability
to estimate  the  economic benefits of  pollution  control  measures,  one  of  the  re-
quirements of  Executive  Order  12291.  The Order  requires  cost-benefit analyses  of
most major Federal  regulations, including  documentation as to whether  or not bene-
fits of proposed regulations exceed the costs.  Additionally, Agency statutes,  such
as the Clean  Water  Act,  require  research  to develop tools and techniques for meas-
uring the  social  and  econamic  benefits  of  environmental  policies and prograns.

     Objective 3.  Manage  Technical  ^ Information  Products.   The  purpose   of  this
objective is  to  manage  o"RD's  technical  information products.   ORD's  Center  for
Environmental Research  Information (CERI)  tracks,  processes, and  distributes  all
ORD reports;  develops   special  reports as  needed;   and  produces  all  ORD  project
summaries and reviews them for policy implications.

     Objective 4.   Disseminate  Technical  Information/Technology  to   States   ajic[
Localities.  The purpose  of this^objective is  to  disseminate PRO's tecnnicaTTnTdr^
mation products.  This  activity  includes  the  design, production,  quality  control,
and distribution of ORD's technology transfer efforts.

     Objective 5.  Manage the Peer and Administrative Review  Control   System."  The
purpose of  this  objective  is  to  develop  and manage  ah OrtO  pollcy"  for  peer  and
administrative review that  Is  consistent with  Agency policy  and to monitor  the
implementation of the policy.
                                        1-9

-------
EXPLORATORY RESEARCH CORE PROGRAM

1984 Program Request

     The Agency  requests  a total  of  515,548,200 and  5.5 permanent workyears  for
this program,  of which $374,300 is  for Salaries and  Expenses and  $15,173,900  is
for Research and Development.  This reflects a decrease  of  SI, 423, 800  and an increase
of S12,583,20Q,  respectively.   A decrease results  from management  changes  in  the
Exploratory Research  program  and  a  reduction  in  economic  benefits  research.
Because of  these management changes  we  have been  able  to eliminate  Salaries  and
Expenses and workyears  in  the  Exploratory  Research  Grants Program and  to eliminate
the strategic  assessment  function.  The increase occurs  because  we have  consoli-
dated all Exploratory  Research  resources  in  this media in 1984.  We will  fund the
Exploratory Grants and Centers at the same level in  1984 as in 1983.

     Implement and Manage the Exploratory  Research  Program.   During  1984 the focus
for the program will continue .to be research grants  and our eight  academic Research
Centers.  However,  the Agency  will   institute  management changes  to   improve  the
Exploratory Research  program.    These changes   should   result  1n  an  Exploratory
Research program that is better  focused  on  our  long-range needs in a way that more
effectively meets these priorities.  The Agency  will  (1)  concentrate on developing
a long-term  research   strategy;  (2)   align  our   grants  program with  the  National
Science Foundation's (NSF) basic environmental research program; and  (3) strengthen
our management  of,  and the role  of,  the Centers to  assure  that they  are meeting
our needs.  The  Agency feels  that it must  clearly  tie  both  the  Grants  and  the
Centers programs to a  long-range strategy  1n  order for the programs to be effective.
In the  future  we  want  to  assure that both of these programs  are  clearly connected
to a long-range strategy.

     In 1984, the Agency will use  the Grants  program to  support research that will
advance the state-of-the-art  in critical  areas  identified in  the  long-range stra-
tegy.  Because these areas  require basic  research,  the Agency believes  NSF,  with
its background  and  ongoing programs, is  the appropriate locus for  this component
of our  program.  The Agency will  therefore manage  the program  in conjunction with
NSF.   The Agency will  transfer $4,000,000  to  NSF  in  1984   for  new  grants.   The
Agency will  work closely  with  NSF  to assure  that these  grants  are  tailored to  our
long-range strategy.   To  provide  for an  orderly  transition  of  the   program,  we
will  retain $6,000,000 in 1984 to complete existing  grants.

     The Agency  will  also  institute changes  to the  management  of  the  Research
Centers, based  on  the  results  of  1983  evaluations  of the Centers.   Additionally,
the Agency will  conduct a  comprehensive  review  of  the  three  Centers that  are com-
pleting their  first five years  of operation.   For  all  of the  Centers  the program
will  emphasize increased interaction  with ORD laboratories and the  Agency pro.gram
offices and dissemination  of  the results of research initiated during 1981-1983.
The eight Centers (funding at approximately $420,000 per Center) and their principal
research areas are:
     (1) The Ultimate Waste^ Ejimj"3^1'0" Center (Illinois Institute of Technology and
     the Uni ve.rsi ty  of  Notre "(Jaine)  conducts '" "re sea re h  on innovative/cost-effective
     process modifications to reduce industrial  pollutants.

     (2) The Intermedia Transport Center '{University of  California  at  Los Angeles)
     is working on the  definition of chemical /physical  processes governing pollutant
     exchange at air-land and air-water boundaries.

     (3) The Ecosystem Center  (Cornell   University)  is  identifying  and  applying
     ecosystem principles to environmental  management  problems.
                                        1-10

-------
     (4) TheMarine Center (University of  Rhode  Island)  is conducting  research  on
     measurenientahcf assessment  of marine  ecosystem  health,  emphasizing  exposure
     of marine organisms to toxics.

     (5) The AdvancedControl  Technology  Center  (University  of  Illinois,  Urbana)
     conducts 'research ' in "the areas~~of 'separation technology,  thermal  destruction,
     biological  separation, and  chemical  detoxification.

     (60 The Ground Water_Center  (a   consortium   of   the  University  of  Oklahoma,
     Ok1 ahoma State Oniv e rsi ty,  and Rice  University)  conducts research  on subsur-
     face characterization, transport  and  fate, and  ground water horizon  modeling.

     (7.0 The Epidemiology Center  (University  of  Pittsburgh)  conducts   research  on
     basic epidemiology  methods'and airborne particulate  health  effects.

     (8.0 The Hazardous Waste Center (Louisiana State  University)  conducts research
     on the design', coni struct! on ^maintenance, operation, and closure  of hazardous
     waste landfills.

     The Agency sees  no need to  continue  the  strategic  assessments  program.   We
feel that  the  focus of  a long-range strategy  and a  comprehensive review  of  our
long-range needs will  adequately  fulfill  this  function.   We  intend to  work  more
closely with Agency program offices and  ORD laboratories  in preparing the strategy.
Additionally, we will welcome comment by  the outside scientific  community.

     The minority   institutions  and national  environmental  workforce  programs  are
the responsibility of this program.  They will continue at the same level of effort
in 1984 as 1983.

     Develop and Validate Economic Benef.it Kethodologies.   In   1984,  this  program
will continue  eFfcirts   fo  develop  imp roved"  methodologies  and  validate  existing
methodologies and  associated  data  required by the Agency to estimate  the economic
benefits of  proposed  regulations  and programs,    the  work initiated  in  1983  for
validation of methodologies and development of  new and improved methodologies  will
continue.  Close program office  involvement will  insure selection of methodological
developments and validations useful to regulatory Impact analyses.

     The 1984 program will  emphasize  completion  of work  started  in  1982 and 1983,
including improved methods  and  validation  of methods  for ozone  and 1-ead control.
These methods will enable the Agency to  make health damage estimates for air pollu-
tants using  econometric approaches,  value the  economic  benefits  of  health  risk
reduction, determine  the  boating  and swimming  benefits  of  freshwater pollution
control, estimate  recreational  benefits  of marine water  pollution control, and use
contingent valuation techniques  for water pollution benefit estimation.

1983Program

     In 1983, the  Agency  is  allocating  a  total  of $4,388,800  and  16.5 permanent
workyears to this  program,  of which SI,798,100  is under  the  Salaries  and Expenses
appropriation and  32,590,700  is  for extramural  purposes under the  Research  and
Development appropriation.

     Imp!ement  and  Manage the  Exploratory  Research  Program.   During  1983,   the
Agency will plan for the  reorientation or~the program that  wi11  occur  in 1984.   Me
will be  working on a long-range  strategy in 1983.   The  Grants  program will -focus
on the  completion  of existing  grants and the development of  plans and procedures
for the  transfer  of  the  program  to  MSF  in  order to enable  NSF  to  focus future
grants to Agency  needs.   The  Centers  program continues to  provide coordination of
the Agency's  eight  Exploratory  Research   Centers.   Activities  include pronoting
increased Agency   involvement  in  Center  program planning,  insuring   appropriate
interaction among  Centers, and  communicating results.   Recommendations  based  on
the effectiveness  review  of  the  Centers  program are  being  completed  in 1983,
                                       1-11

-------
     Projects to support the Strategic Assessments program in 1983 include a seminar
series on  environmental  implications  of  biotechnologies,   analyses  of  long-term
trends that  focus  on issues of regional  concern,  and analyses  of  emerging  trends
in United  States  industries.  Since  this is  the  final  year  of the program,  the
Agency will prepare for an orderly close-out of the program.

     Deyelop  and Validate  Economic BenefitMethodologies.   This program  conducts
methodological research designed  to  enable  the Agency to better  estimate  the eco-
nomic benefits of  pollution abatement and control  alternatives  and  other  environ-
mental decisions.  The program concentrates  its  research  activities in  three major
areas:  methodology  development,   methodology  validation,   and  special   studies.
Close interaction  and  cooperation  with  Agency program offices  are  emphasized.
The program is substantially expanded In 1983 to meet the need for improved methods
imposed by the Executive Order,

     (1) Methodology Development and Validation:   Current  research  programs  are
     seeking to  develop  innovative   methodologies   designed  to  provide  improved
     water and  air  benefits  estimates  and  alternate  methodologies to  estimate
     benefits of  land  disposal   regulations  for   hazardous  wastes.   Validation
     research is being designed to test the utility of applicable economic  benefits
     estimation methodology.

     (2) Special  Studies:  This program focuses  on economic  research  issues  of spe-
     cial concerntothe  Agency.  These  include projects  designed to  inventory and
     assess economic benefits  research  in areas such as economic  risk  valuation;
     to .carry out  research  on  technical  issues of  portraying confidence limits and
     uncertainty in  benefit  estimates,  and  to improve techniques  for  determining
     the valuation of morbidity and mortality.

1983 Explanation of Changes from Budget Estimate

     The net 1ncrea.se of +$176,100 results from the following actions:

     -Congressional Action.  ( + $116,300)  This  increase  includes + S116.300  of the
Salaries and Elxpe'rises;  affd-on which  supports  the 480 additional permanent full-time
workyears provided to the Agency.

     -Reprogrammings.   (+$59,800)   During  the development  of the  operating  plan,
several  reprogrammings  were  made  to this activity  which are  .not reportable under
the Congressional   reprogrammings  limitations.   These changes resulted  in  a  net
Increase of +359,800 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982, the A.gency obligated a total of .56,558,000 for this program,  of which
52,015,200 was under the Salaries  and Expenses appropriation and $4,542,800 was for
extramural purposes under the Research and Development appropriation.

     Imp 1 emen t an d Hana ge the Exp 1 oratory Re search  P rogram.   The  Agency  continued
its managemeht of the Exploratory  Grants program.  A formal  solicitation for grants
was issued.   Proposals were  reviewed and  funded   based  on  scientific  merit  and
relevance to Agency objectives..  A .series of seminars was conducted where  grantees
presented their project results to peers,'1 Agency specialists, and interested public.

     A Hazardous Waste  Research Center  at Louisiana  State University  was initiated
in 1982 as part of  the Exploratory Research  Centers  program.   This Center studies
the design,  construction,  maintenance,  operation,   and  closure of  hazardous  waste
landfills and  facilities..   Research also  includes  .remedial activities  related to
the problems unique  to  spills  and other  emergency  /situations.  A major review of
the Centers  program  began   in  1982  to  detemri-ne   the  effectiveness  of  existing
Centers.
                                        1-12

-------
     The 1982 Strategic Assessment and Special  Studies program produced the follow-
ing outputs:  (1)  revised and  updated an analysis  of  future emission trends  for
use in  the  Environmental  Outlook  report; !2)  conducted eight special  assessments
of selected  emerging  or future environmental  problems;  (3)   completed  an  analysis
of problems in the Sun  Belt  region;  (4)  reported  on future problems resulting from
changes in United States industry; (5) conducted a seminar series on issues associ-
ated with  riskrbenefit computations;  (6)  continued  the  Summer Fellows  program;
and (7) conducted a program  review  of environmental indicators'  efforts (including
the Mussel Watch and Pilot Specimen Bank programs).

     The minority institutions  research  support program  moved closer to completing
its objective in 1982.   In order to continue  to promote the  participation of minority
institutions in the Grants  program,  the  Agency  established  an  Ombudsman  function
to aid  eligible institutions  in  competing  more effectively within  the  Agency's
Exploratory Research Grants  program.

     The 1982  national  environmental  workforce program  continued to  provide  sup-
port to  the Agency.   This  program  established a  volunteer senior  environmental
assistance program in  support  of  State environmental agency  workforce  needs,  con-
tinued to promote the  use of  senior citizens  working  for the  Agency  through  the
senior environmental  employment  program,  developed  three  additional minority  re-
search apprenticeship   programs, and  developed  and  managed an estimated 20  grants
for academic training.

     Develop and Validate Economic Benefit Methodologies.  The 1982  economic  bene-
fits research program  was  substantially  revised  to focus on  data  development  and
methods validation of  particular  use in  carrying out the most  urgent  studies  re-
quired by  Executive  Order  12291,  which requires  cost-benefit  analysis  of  most
major Federal regulations.   In  1982,  the  program  emphasized  improved methodologies
for determining the  benefits  of water  pollution control regulations,  for determining
the benefits of  revised ambient  air  standards  (particularly lead and  ozone),  and
for assessing  the  methods available  to  determine  the   benefits  of hazardous  and
toxic waste control.   Some of  the methods and  data developed  on economic  benefits
of air pollution control are being used in regulatory impact analyses for revisions
of air ambient standards.  The  program also  completed a  major study  of the benefits
of improved  visibility in  the  Eastern United  States  t.o determine the  benefits  of
related ambient standards.

TECHNICAL INFORMATION  AND LIAISON

1984 Program Request

     The Agency requests  a  total  of  32,595,400 and  17.0 permanent workyears  for
this program, of which $1,727,200 is  for  Salaries and Expenses and  $868,200  is  for
Research and Development.  This reflects  an  increase  of $26,900  and 56,300 respec-
tively, which supports  high  priority  technology transfer activities.   Beginning  in
1983, the Agency has consolidated  resources  for this function in  the Interdiscipli-
nary media because the  function cuts across all  media.  Prior  to  1983, the resources
were spread across all  media.

     Manage Technical  Information  Products.   The Center  for  Environmental  Research
Information (CERI)  is  and will  continue to  be the central  point  for all  ORD  infor-
mation products.  CERI will  track, process,  and distribute all ORD reports, develop
special reports as  needed,  produce all  ORD  project summaries,  and  review project
summaries for policy implications.  CERI's product  management activities will  fall
into three major areas:  (1)  processing reports and  journal articles for submission
to the National Technical Information  Service  (NTIS); (2)  reviewing and processing
project summaries;  and  (3) printing, warehousing, and distributing  ORO information
products.  In 1984, CERI  plans to  process  approximately  850 Project  Reports  and
250 journal   articles  to  NTIS.   It  will  also  process  approximately  800  project
                                        1-13

-------
summaries and 40  other reports.  CERI  will  continue  to  process special  requests
for reports, respond  to telephone inquiries,  continue cost  recovery charges  for
project summaries and  Technology  Transfer  reports,  produce the  regulatory  program
oriented Research  Summaries,  and  oversee  development  of  the  Congressionally-
mandated Research Outlook*    The  publications  prepared  and  disseminated  by  the
program includedesignmanuals,  technical  capsule  reports,   seminar  proceedings,
and handbooks.   Specific activities  are  planned  in  such areas  as:  •Oxidants.  with
a series  of workshops  to  provide information  to  help  State and  local  official s
compliance monitor for  sample  organic  compounds  that are precursors to  the  forma-
tion of photochemical   oxidants; Mu ri j c i p a 1 W a s tew a te r,  with  a  manual  on alternative
technology, costs, and  risk  benefit  assessment data  for  selecting  sludge disposal
methods; and Hazardous Waste/Superf u nd,  with development  of  handbooks  on  assess-
ment of  monitoringandtesting protocols  for solid  waste  hazardous  assessments
and technical alternatives for uncontrolled hazardous waste sites,

     Disseminate Technical  Information/Technology to  States and Localities.   In re-
sponse torequests  from the  EPA  programoffices  and  the  needs expressed  by  the
Regions and  the  States, QRD  continually  disseminates the  available  technology to
States and  localities  to enable  them  to meet  their  regulatory  responsibilities.

     There are two primary  tools  used  by the Technology  Transfer Program to carry
out its  mission:   seminars  and publications.   Seminars  are  developed  by  a  team
headed by a  CERI  staff member.   This  team  normally  includes both  EPA  and  private
industry personnel  who  have  expertise   in   the  particular  technical  discipline
being addressed.  The   seminar  presentations  discuss  the  applicable  regulations,
the multimedia pollution control  technology  available to meet  the  regulations  and
the management/financial consideration in choosing optimum  pollution  control  stra-
tegies,

     Manage the Peer and Administrative Review Control System.  ORD's  primary  mis^
sion Ts  to  provide"	scientific  information  heede'd5y  ffTe  Agency  to  support  its
regulatory and  enforcement  activities.   In  order to effectively  accomplish  this
mission, it  is  imperative  that ORD  maintain a  credible  scientific program,  both
known to,  and  acknowledged  by,  our peers in the  environmental,  scientific,  and
technical communities.   As  a part of that process  for furthering  the  credibility
of EPA research  and  its results, EPA  has  instituted a  review process for scientific,
informational,  and educational documents to ensure that they  are  based  on the  best
scientific and  technical  evidence   available.   This  process  provides  a  clearly
defined route for the  review and  approval  of the publications  before  their public
release.  The  goal  is to  establish clear  Agency   responsibility  for  literature
published in Its  name  and  by its employees  when  they are  acting  in an official
capacity.

     Within ORD,  CERI   has  the  responsibility for administering  the process  and
coordinating with the   appropriate  Agency  personnel   to  insure  a  responsive  and
effective peer review  process.  It  is  anticipated that 1,500  to 2,000  peer  reviews
will be processed in 1984.

1983Program

     In 1983, the Agency is  allocating  a total  of  52,562,200  and  16.9 permanent
workyears to this program,  of which  $1,700,300 Is under the  Salaries  and Expenses
appropriation and 5861,900 is for extramural  purposes under the Research and Devel-
opment appropriation.

     Manage  Technical  Inf qnnationProducts.   Product  (Management  Activities 'are
needed on a  continuing basis;  so,  the  TW3  Program  is similar  to  that described
in the 1^984 program  Request.  In  1983,  CERI  is processing publications to NTIS, as
well as^processing  and distributing project  summaries and other  reports.   These
activities ensure that  ORD's  scientific  and  technical  information  products  are
produced cost-effectively,   controlled   for  quality,   and  distributed  uniformly.
                                        1-14

-------
 Inquiries for reports are being answered; and, regulatory program oriented Research
 Summaries and  the  Congressionany-mandated  Resea re n Out!ook  are being  produced.
 In addition, ORD  is  initiating  cost  recovery "charges  for project summaries and for
 Technology Transfer  reports;  CERI  Is administering  this  process.   All  funds recov-
 ered will be deposited into the Treasury general  fund.

     Pi sseminate  Technical   Information/TechnoTogy  to  States  and   local i ties.
 Varioiis technology  transfer products are being developed,  suchas design manuals,
 user's guides, handbooks,  training  seminars, and workshops.  These  are  being  pro-
 duced in  close cooperation  with the  program offices and  the Regions  (and  often
 involve participants from industry)  and generally  include  discussion of regulations,
 best available pollution control technologies, management and  financial  considera-
 tions, and  case   histories of  actual  operations.    Specific  technology  transfer
 activities are being carried  out in Hazardous Air Pollutants,  Gases and Particles,
 Water Quality, Municipal  Wastewater,  Industrial  Wastewater,  Drinking Water,  Haz-
 ardous Waste,  and Toxics.   Other  research  efforts  receive  support as  requested
 and as needs arise.

     These activities provide State  and local  officials with the  technical  data
 necessary to meet regulatory  responsibilities.

     Manage the Peer and Adroi'nistrative Review Control System.   Currently,  the  im-
 plementationof OftD's technical  information  policy, peer review policy,  and public
 information policy  is  being  coordinated  and monitored  by  CERI.   The Director  of
 CERI advises the  Director  of the  Office  of  Research  Program Management  and  the
 Assistant Administrator for ORD on particular Issues related to the above policies.
 The 1983  program  is similar to the  1984 request, as  thes.e  activities  are required
 on a continuing basis.

 1983_Expl^nation of  Changej from BudgetmEstimate

     The net increase of +$2,562,200 results from the  following action:

     -Restructuring.  (+52,555,200)   The  Congressional 1y  approved  restructuring
 consolidated 13  TecTinical  Information  and Liaison program elements  across  media
 into one  Technical   Information and  Liaison  program  element,    This  allows  for
 a more  accurate  overall  picture of the  program activities.   The  change to  the
 Salaries and Expenses appropriation  was  +51,693,300 and  the change to  the Research
 and Development appropriation was +$861,900.

     -Reprogranimin_gs.  (+$7,000)   During  the  development  of  the  operating  plan,
 several repfogrammijig s were  made to  this  activity  which are  not reportaple  under
 the Congressional  reprogrammings  limitations.   These changes  resulted  in a  net
 increase of +$7,000  to the Salaries and Expenses appropriation.

 1982 Accomp1i shments

     Since this  program  was  not  consolidated  into   the  Interdisciplinary  media
 until 1983,  resources for  1982 are  contained within  the individual media.   The
 1982 accomplishments of the program follow.

     Manage Technical tInformation Products;.  In 1982,  CERI wa.s  the central  point
 for aTT  QRtTTntormatioh products. "' CERl'tracked,  processed,  and  distributed  all
ORD reports, developed  special  reports,  produced  all   ORO project summaries  and
 reviewed the project summaries for  policy implications.  CERI processed 540 project
 reports and 430 journal  articles to  NTIS.   It also  processed  475 project summaries
 and 78  other reports.  CERI  responded  to telephone  inquiries,  processed  special
 requests for reports, and produced  the Research Outlook.
                                        1-15

-------
     Pi sgenri nate Technical I nformation/Technol qgy  to States  and  J.pca1 i ti es.   In
1982, CtFfIwas  1 nvo 1 ve
-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
INTERDISCIPLINARY

    ABATEMENT A CONTROL
       Federal  Agencies Compliance & NEPA Compliance	  1-18
          NEPA Cortipl iance	  1-19
          Federal Agencies Compliance	,	  1-20
          New Source  EIS Preparation.	  1-20
       Accelerated Review and Permitting......	  1-22
       Interdisciplinary Training Grants	  1-24
                                      1-17

-------
                                  INTERDISCIPLINARY

                    Federal Agencies Compliance 4 NEPA Compliance
                                ACTUAL   BUDGET
                                 1982    ESTIMATE
                                           1983
                             CURRENT   ESTIMATE  INCREASE +
                             ESTIMATE    1984    DECREASE -
                               1983             1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
NEPA Compliance
 Salaries 4 Expenses
 Abatement Control &
 Compliance
Federal Agencies
Compliance
 Salaries & Expenses
New Source EIS
Preparation
 Salaries & Expenses
 Abatement Control <5
 Compliance
TOTAL:
 Salaries 4 Expenses
 Abatement Control <5
 Compliance

Federal Agencies
Compliance 4 NEPA
Corapl iance
                       TOTAL
        52,006.8   $1,786.5
TOTAL   $2,006.8   SI, 786.5
                       TOTAL
          $362.7
          $315.0

          $677.7
$118.7
$869.8

$988.5
        $2,369.5   $1,905.2
          $315.0     $869.8
                                         $3,090.7  $3,090.7
                                         $6,563.9  $6,563.9

                                         $9,654.6  $9,654.6
         $1,834.0   $1,881.5     $47.5
         $1,834.0   $1,881.5     $47.5
$123.4              -$123.4
$869.8              -$869.8

$993.2              -$993.2
         $1,957.4   $4,972.2  $3,014.8-
           $869.8   $6,563.9  $5,694.1
TOTAL   $2,684.5   $2,775.0   $2,827.2  $11,536.1  $8,708.9
PERMANENT WORKYEARS
NEPA Compliance

Federal Agencies
Compliance

New Source EIS
Preparation

TOTAL PERMANENT WORKYEARS
            56.8


            10.2


            67.0
  46.8


   3.0


  49.8
  46.8
   3.0
  49.8
 69.7      69.7

 46.8


           -3.0
116.5
66.7
TOTAL WORKYEARS
NEPA Compliance

Federal Agencies
Compliance

New Source EIS
Preparation

TOTAL WORKYEARS
            58.6


            11.0


            69.6
  48.0


   3.0


  5.1.0
  48.0
   3.0
  51.0
 72.2

 48.0
120.2
                                                       72.2
           -3.0
69.2
                                        1-18

-------
                                 INTERDISCIPLINARY


                  Federal Agencies Compliance and .NEPA Compliance
Budget Request
     The Agency  requests a  total   of $11,536,100  and  116.5  permanent  workyears
for this program,  of  which  54,972,200 is for the Salaries  and  Expenses appropria-
tion and $6,563,930  Is  for  the  Abatement,  Control  *nd  Compliance  appropriation.
This represents  an increase  of $8,708,900 and  66,7  permanent workyears  from 1983
levels, reflecting the  consolidation  of  New  Source  EIS Preparation and  NEPA Com-
pliance Municipal  Wastewater  Treatment  Facility  Construction   (previously  funded
in the  Water medium)  into  one  comprehessive  program  element, NEPA  Compliance.

Program Description

     In previous years,  this subactivity included the review of  Federal  agencies
actions and  Environmental  Impact Statements  (EISs)  together with  the preparation
of EISs for National Pollutant  Discharge  Elimination  System  permits for  new sources.
Beginning in  1964, activities  and  resources  formerly  associated  with  EIS  Review
will be  renamed and  continued as  Federal  Agencies  Compliance.  Resources  which
support New  Source EIS  Preparation activity are  now  reflected in the newly created
NEPA Compliance  program element  along  with  total resources  from NEPA Compliance
Municipal Wastewater Treatment Facility Construction  (previously  funded  in the Water
medium).

     NEPA Compliance —  Section 511(c) of the Clean  Water Act requires EPA to pre-
pare TrwTronmental Impact  Statements  (EISs)  or,  alternatively,  determine  Findings
of No Significant  Impact on  National  Pollutant Discharge Elimination System (MPDES)
permitting and  municipal  wastewater  treatment  grant actions to  assure facilities
are planned,  constructed,  and  operated  in  conforiuance with  the National  Environ-
mental Policy  Act (NEPA).   These  activities  were  previously budgeted separately
under the  Interdisciplinary  medium as  New  Source  EIS  Preparation  and the  Water
medium as  NEPA  Compliance  Municipal   Wastewater  Treatment Facility  Construction.

     Federal Agencies Compliance <•- Under the direction of the National Environmen-
tal Policy Act  (NEPA),  Section 309  of the Clean  Air  Act and  Executive Order 12088
(Federal Compliance with Pollution Control  Standards), activities for this program
include review  and comment  on  EISs  and  on  the  environmental impact  of any major
legislation, regulations or  other  actions proposed  by  other  Federal  agencies^   In
addition, under  Executive  Order 12088  and  OMB  Circular A-106,  resources  in this
program assist  Federal  agencies  1n;  (1) identifying  facilities needing pollution
control mechanisms; (2) determining the most cost-effective control; (3) developing
fiscal plans  for  installing  needed  abatement  control technology; and (4) resolving
disputes surrounding facilities which are out of  compliance.

     New Source E.IS Preparation -- EPA is responsible  for preparing its  own EISs
or, alternatively, determining F1ndings  of No  Significant  Impact  on National Pol-
lutant Discharge  Elimination System permitting to  ensure that  new  facilities  are
planned, constructed,  and  operated  pursuant to  Section 511(c)   of the  Clean Water
Act and NEPA»   For 1984, New Source  EIS  preparation activities  are included In the
newly created program element, NEPA Compliance.

NEPA COMPLIANCE                                                              , '

1984 j^rogranv Jecjuest

     The Agency  requests a  total  of  $9,654,600  and 69,7  permanent  workyears  for
this program,  of which $3,090,700  is for the "Salaries and Expenses appropriation
and $6,563,900  is  for  the  Abatement, Control  and  Compliance  appropriation.  The
program expects  to initiate  46 EISs and  related studies in  1984.   EPA will focus
on assuring  that effective  environmental assessments  are  keyed  to specific issues
and on  preparing  credible  and  defensible   Findings  of  No Significant   Impact.
                                      1-19

-------
1983 Program

     No resources  are  allocated  to  this  program in  1983.  Resources  for  these
activities were budgeted in NEPA Compliance Municipal  Wastewater  Treatment Facility
Construction in  the  Water  media and  New  Source EIS  Preparation in  the   Inter-
disciplinary media.

1983 Explanation of Changesfrom Budget Estimate

     There was no change to this program.

1982 Accomplishments

     No resources  were  allocated to  this program  in 1982.  Resources  for  these
activities were budgeted in NEPA Compliance Municipal  Wastewater  Treatment Facility
Construction in  the  Water  media and  New  Source EIS  Preparation in  the   Inter-
disciplinary media.

FE DE RAL AGENCI E_S C OMPLI AN CE

1984 Program Request

     The Agency  requests  a total of  $1,881,500  and  46.8  permanent wortcyears  for
this program, all  of  which is  for the Salaries  and  Expenses appropriation.   This
represents an increase  of  $47,500 and no  change  in  permanent workyears from  1983
levels for these  activities.   This program  expects  to  review and comment  on  550
draft and 200  final  EISs.  In  addition,  the Agency  will place  increased emphasis
on advice to Federal  agencies   on  control  methods   and  requirements,   compliance
monitoring,  and dispute resolutions.

1983 Program

     In 1983, the  Agency is  allocating  a total   of  $1,834,000   and 46.8 permanent
workyears to this program, all  of which is  for the  Salaries and  Expenses appropri-
ation.  EPA  will  continue  to  identify and  resolve  environmental  concerns at  an
early stage  in  the  project development  process.   The  program  expects  to   review
over 400 draft and 200 final EISs.

1983 Explanation of _Changes from Budget Estimate

     The net increase of +$47,500 results  from the following action:

     -Reprogrammings.  (+547,500)  During  the development  of the operating  plan,
several reprogrammings were made to  this activity which  are not  reportable  under
the Congressional  reprogramming  limitations.  These changes resulted  in   a  net
increase of +547,500 to the Salaries  and Expenses  appropriation.

1982 Accpmpli shments

     In 1982, the  Agency  obligated a  total  of $2,006,800 for this program,   all  of
which was for the Salaries and Expenses appropriation,  The  program placed emphasis
on identifying and resolving  environmental  concerns  at  an early  stage in the pro-
ject development process.  In  addition, it reviewed and  commented on over 500 draft
and 400 final Environmental Impact Statements.

NEW SOURCE EIS PREPARATION
1984 Program Request

     The Agency requests no  resources  for this  program element in 1984.  The acti-
vities performed  under this  program  element have  been  restructured  and are  now
included in the newly created NEPA Compliance program element.
                                        1-20

-------
1983 Program

     In 1983, the Agency  is  allocating a total  of 5993,200  and 3.0 permanent work-
years for this  program,  of which $123,400  is for the  Salaries  and Expenses appro-
priation and  $869,800  is  for the Abatement,  Control  and Compliance appropriation.
1983 resources  reflect the  shift  away  from initiating new EISs and toward complet-
ing those already  jin progress.  The program  expects  to  complete one draft and five
final EISs in 1983.

1983 Explanation of Changes from Budget Estimate

   •  The net increase of +54,700 results from the following action:

     -Reprogramiiiing's.  (+$4,700)   During  the  development  of  the  operating plan,
several reprogrammings were  made to this  activity  which are  not  reportable under
the Congressional reprogramming limitations.   These changes resulted  in  a net In-
crease of +54,700 to the Salaries and Expenses appropriation.

1982 Accompli.shments

     In 1982, the Agency  obligated a  total of  5667,700 for this program, of which
5362,700 was  for  Salaries  and Expenses and  5315,000 was for Abatement, Control and
Compliance.  The Agency completed six draft and six final EISs,
                                        1-21

-------
                                  INTERDISCIPLINARY

                           Accelerated Review & Permitting
                                ACTUAL   BUDGET
                                 1982    ESTIMATE
                                           1983
      CURRENT
      ESTIMATE
        1983
                                       ESTIMATE  INCREASE +
                                         1984    DECREASE -
                                                1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Accelerated Review &
Permitting
 Salaries 4 Expenses
 Abatement Control &
 Compliance
TOTAL :
 Salaries & Expenses
 Abatement Control &
 Compliance
        $1,263.2   $1,805.4   $1,759.5
        $1,688.4   $1,600.0   $1,600.0

TOTAL   $2,951.6   $3,405.4   S3.359.5
        SI,263.2   $1,805.4   $1,759.5
        $1,688.4   $1,600.0   $1,600.0
Accelerated Review &   TOTAL   $2,951.6   $3,405.4   $3,359.5
Permitting
                           -$1,769.5
                           •-$1,600.0

                           -$3,359.5
                           -$1,759.5
                           -$1,600.0
                                                  -$3,359.5
PERMANENT WORK YEARS
Accelerated Review &
Permitting

TOTAL PERMANENT WORKYEARS
            25.5
            25.5
30.6
.30.6
30.6
30.6
-30.6


-30.6
TOTAL WORKYEARS
Accelerated Review &
Permitting

TOTAL WORKYEARS
            40.0
            40.0
49.3
49.3
48.9
48.9
-48.9


-48.9
                                        1-22

-------
                                INTERDISCIPLINARY


                        Accelerated Review and Permitting
Budget Request
     The Agency requests  no  resources  for this activity in  1984.   This  represents
a decrease of $3,359,500 and 30.6 permanent workyears from  1983 levels.

ProgramDescription

     This program contains the resources  for  the  Accelerated Review and  Permitting
program.  It expedites  development  of  energy-related and  other  important projects
in an environmentally sound manner by  augmenting, when  necessary,  the  resources  of
EPA's permitting,  Environmental  Impact  Statement  (EIS)  review, and EIS preparation
programs.

ACCELERATED REVIEW AND PERMITTING

1984 Program Request

     The Agency 1s  not  requesting  funding for this  activity  1n  1984 because the
anticipated workload for  accelerated permitting has  not materialized.  This  repre-
sents a  decrease  of  $3,359,500  and  30,6  permanent workyears  from 1983  levels.

1983Program

     In 1983,  the  Agency is  allocating a  total  of $3,359,500  and  30.6 permanent
workyears for  this  program,  of wh^ch  $1,759,5130  1s  for the Salaries  and Expenses
appropriation and $1,600,000  is  for the  Abatement,  Control  and Compliance  appro-
priation.  The  program  1s continuing  to  develop  and Implement  streamlined  proce-
dures for  environmental   review  and permit  Issuance.  Most  of  these efforts are
concentrated on  accelerated  permit  Issuance  for   complex  development  projects.

1983 Explanation of Changesfrom Budget Estimate

     The net decrease of -$45,900 results  from the following action:

     -Reprogrammino. s.  (-$45,900)  During  the development  of  the  operating  .plan,
several re p r o g r arrant n g s  were  made to this  activity  which are  not  reportable  under
the Congressional   reprogrammtng  limitations.   These  changes  resulted   in  a  net
decrease of -$45,900 to the Salaries and Expenses appropriation.

1982;Accomplishments  •

     In 198?,  the  Agency  obligated a  total   of  $2,951,600 for this program,  of
which $1,263,200 was  for the Salaries  and Expenses appropriation  and  $1,688,400
was for the  Abatement,  Control  and  Compliance appropriation.    The  program was  in
its second year and emphasized development of streamlined permit review procedures
and environmental  assessment at an early stage 1n project development.
                                        1-23.

-------
                                  INTERDISCIPLINARY

                          Interdisciplinary Training Grants
                                ACTUAL
                                 1982
                  BUDGET
                  ESTIMATE
                    1983
                   CURRENT
                   ESTIMATE
                     1983
       ESTIMATE  INCREASE +
         1984    DECREASE -
                1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Interdisciplinary
Training Grants
 Abatement Control i
 Compliance
                       TOTAL
          $110.0

          S 110.0
                      $200.0

                      $200.0
                    -S200.0

                    -$200.0
TOTAL:
 Abatement Control &
 Compliance

Interdisciplinary
Training Grants
TOTAL
$110.0


$110.0
$200.0


$200.0
-$200.0


-$200.0
                                        1-24

-------
                                 INTERDISCIPLINARY


                         Interdisciplinary Training Grants


Budget Request

     The Agency requests no resources for this program in 1984.

INTERDISCIPLINARY TRAINING GRANTS

1984 Program Request

     The Agency  requests  no  resources   for  this program  in  1984.   We  feel  that
the program has  accomplished  its  objectives.  Many academic  institutions have now
established environmental  science programs;  and,  the  number  of .students trained in
this discipline has substantially increased.

1983 Program

     In 1983, the  Agency  is  allocating  a total  of  3200,000  to this program within
the Office of Research  and Development  (ORD),  all  of  which is under the Abatement,
Control and Compliance  appropriation.   The  program continues to  support academic
training through fellowships  and training grants.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$200,000 results from the following action:

     -Congressional Action.  (+5200,000)  The Congressional add-on to this activity
of +$200,000"'to  the Abatement, Control  and  Compliance  appropriation was  for the
academic training program.
                                      v
1982 Accomplishments

     In 1982,  the  Agency  obligated  a  total  of $110,000 to  this  program  within
ORD, all of  which  was  under  the  Abatement,  Control  and  Compliance appropriation.
The program funded  20 training grants and fellowships.
                                         1-25

-------
Page Intentionally Blank

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table  of Contents
INTERDISCIPLINARY

    ENFORCEMENT
       Enforcement Policy & Technical  Support	   1-27
          Technical  Support - Office of Legal & Enforcement Counsel	   1-29
          Enforcement Policy & Operations..	   J-30
                                       1-26

-------
                                  INTERDISCIPLINARY

                        Enforcement Policy & Technical  Support

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Technical Support -
Office of Legal &
Enforcement Counsel
 Salaries & Expenses           $3,489.6   $3,241.0   $3,241.0   S3,041.7   -$199.3
 Abatement Control S              $29.1      S4Q.O      S40.0     S285.5    S245.5
 Compliance
                       TOTAL   $3,518.7   $3,281.0   $3,281.0   $3,3.27.2     S46.2

Enforcement Policy &
Operations
 Salaries & Expenses           $1,084.6   $6,864.0   $7,117.2   $8,128.7  $1,011.5
 Abatement Control &                        $200.0     $200.0     $200.0
 Compliance
                       TOTAL   $1,084.6   $7,064.0   $7,317.2   $8,328.7  $1,011.5


TOTAL:
 Salaries S Expenses           $4,574.2  $10,105.0  $10,358.2  $11,170.4    $812.2
 Abatement Control &              $29.1     $240.0     $240.0     $485.5    $245.5
 Compliance

Enforcement Policy &   TOTAL   $4,603.3  $10,345,0  $10,598.2  $11,655.9  $1,OS7.7
Technical Support


PERMANENT WORKYEARS
Technical Support -                66.8       65.2       65.2       51.0     -14.2
Office of Legal S
Enforcement Counsel

Enforcement Policy &               13.4      152.6      146.6      163.4      16.8
Operations

TOTAL PERMANENT WORKYEARS          80.2      217.8      211.8      214.4       2.6


TOTAL WORKYEARS
Technical Support -                81.5       79.8       79.3       63.4     -15.9
Office of Legal 4
Enforcement Counsel

Enforcement Policy &               17.1      167.6      160,7      176.9      16.2
Operations

TOTAL WORKYEARS                    98.6      247,4      240.0      240.3         .3
                                        1-27

-------
                                 INTERDISCIPLINARY


                      Enforcement Policy and Technical  Support
Budget Request
     The Agency requests a  total  of 511,655,900 and 214.4  permanent  workyears  for
1984, an  increase  of $1,057,700 and 2.6  permanent  workyears  from  1983.   Included
in this  total  is  $11,170,400  for  Salaries  and Expenses and  $485,500 for  Abate-
ment, Control  and  Compliance,  with increases  of  5812,200  for  Salaries  and  Ex-
penses and  5245,500   for  Abatement,   Control,  an.d Compliance.   An  Increase  In
workyears for  civil   an.d criminal  litigation  efforts  in  Enforcement Policy  and
Operations is  substantially offset  by a  decrease  in  the  technical   support  pro-
gram due to  a  transfer  of  compliance technical support  to  the appropriate program
offices.

ProgramDescription

     Technical  Support - Office of Legal  and Enforcement  Counsel  ~  The   National
Enforcement InvestigationsCenter  (NlElC)   fs  the  primary   source  of  specialized
technical support  for  the  Office  of  Legal  and Enforcement  Counsel  (OLEC)  for
specific case  development  activities  for  all  media.   .NE1C provides  Headquarters
and Regional  offices  with technical  support for litigation development in nationally
managed cases;   cases with  precedential  implications;   criminal  cases; cases  with
multi-regional  impacts;   cases  involving  unique  technological   requirements  and
complexity; and  cases  which  exceed a Region's  capability and  resources.   NEIC
plans, develops, and provides technical assistance,  information and interpretations
for civil and  criminal  case preparations involving: the  Resource  Conservation  and
Recovery Act (RCRA);  the Toxic  Substances Control  Act  (TSCA); the  Clean water  Act
and other  water pollution  control  legislation;  the Clean  Air  Act;  the  Federal
Insecticide,  Fungicide  and  Rodenticide  Act  (F1FRA);   and   regulatory  aspects  of
other environmental legislation, statutes and executive  orders.

     Enforcement Policy and Operations  -•- This  program  element comprises  the legal
aspects of Agency enforcement programs  in all  non-Superfund  media.  It is  comprised
of Headquarters and Regional resources  and personnel which provide for the  develop-
ment and implementation  of  legal  enforcement  policy and procedures.  This  includes
the direction  of legal  enforcement  activities of the Agency including  the initia-
tion and  conduct  of  civil  and  criminal   litigation  as  appropriate.   Full  legal
enforcement support services are  provided  to media compliance programs in accordance
with specific media priorities and compliance monitoring activities.

     Efforts are coordinated with the Office of Deputy General  Counsel  and  Regional
Counsel staff  attorneys  to  assure consistency of interpretation and application of
the law.  Litigation  activities  are conducted  in cooperation with the  Department
of Justice (DOJ),  Technical  support is provided  by  the National  Enforcement  In-
vestigations Center  (NElC)  in  Denver,  Colorado  and individual media  and  regional
offices.  States are  encouraged to  resolve compliance   problems  whenever  possible
with Agency assistance as appropriate.

     The Agency  enforcement strategy  is   results  oriented.   Environmentally  sig-
nificant violations  are  pursued  vigorously in  a certain,  timely,  predictable,  and
fair manner.    Health  and safety  related  violations will  continue  to  receive over-
riding priority attention.

     Environmental  problems resulting  from improper waste  disposal  practices  will
be of high'priority and appropriate statutes and sanctions  will be brought to bear
to resolve compliance problems in the  most effective  way.  For all media,  problems
of initial and/or  continuing compliance  by major  sources  will  be  addressed  with
appropriate legal   enforcement  responses.    Instances  of  non-compliance with judi-
cial orders  or consent  decrees  also  will  receive  attention.  Criminal  sanctions
will be considered for the  most significant and indefensible forms of environmental
misconduct.
                                       1-28

-------
TECHNICAL SUPPORT - OFFICE OF LEGAL AND ENFORCEMENT ..COUNSEL

1984Program Request

     The Agency  requests  a  total  of  13,327,200 and  51.0  permanent workyears  for
1984, an  increase   of  $46,200 and  a  decrease  of  14.2 permanent  workyears  from
1983.  Included  in this total is $3,041,700 for Salaries and Expenses  an.d  $285,500
for Abatement, Control and  Compliance.  This  represents a  decrease  in  Salaries and
Expenses of $199,300 related to workyear reductions  and an increase of $245,500 in
Abatement, Control   and  Compliance  for contract  funds to  support  litigation  and
evidence audit activities.  The  decrease reflects  a  refocusirtg of  efforts  to  meet
the needs  of  the  Agency's  legal  case preparation  activity.  Previous  technical
efforts in  support  of  non-litigation  activities  such  as  quality assurance  and
sample analysis  for  pesticides  and toxics  have been transferred  and  are  provided
for in the  specific  media requests as  appropriate.   This  budget  subactivity  com-
prises the activities of  the National  Enforcement Investigations Center  (NEIC)  at
Denver, Colorado.

     The NEIC operates  in an integrated multimedia  mode in  support of Agency en-
forcement priorities.   In 1984  it will  respond  to  Headquarters.,  Regional,  and
State requests for  assistance in  instances where  specialized technical needs are
required.

     In the air  enforcement program,  NEIC will  support civil litigation  activity
resulting from the  December  31,  1982  Clean Air Act  deadlines and  from compliance
dates contained  in  existing  consent  decrees.  Support  will  also  be  provided  to
litigation cases   regarding   noncompllance  with  National   Emissions  Standards  for
Hazardous Air Pollutants  (NE5HAPS) and  New   Source  Performance   Standards  (NSPS).

     In the water  program,  the NEIC  will  assist  in the  evaluation of  operations
and maintenance  problems  preparatory  to  litigation  where  complex technological
factors require  intensive or  prolonged evaluation  or  precedents  are involved.  As
available, NEIC will provide technical  support to  adjudicatory hearings on  National
Pollutant Discharge Elimination  System  (NPDES)  and Best  Available Technology (BAT)
permits.

     The Center's  assistance  in  hazardous  waste  will emphasize  case  preparations
at the larger  or more complex  sites  where significant  violations are  identified
through Regional  media  compliance  monitoring.   Priority  will be   given  to  case
preparations of precedential or deterrent value.

     In support  of  litigation case development  in the pesticides enforcement  pro-
gram, NEIC  will  conduct  major  mass  application  misuse   investigations  exceeding
State and Regional   resource  capabilities.  NEIC's  activity  in the  toxics  enforce-
ment program will involve cases  arising from  violations  in reporting,  record-keep-
ing, storage, handling,  testing,  and violations  of  chemical control  rules  for toxic
substances.

     In the Abatement, Control and  Compliance appropriation,  $285,500  will  support
litigation by  providing  expert   witnesses,   technical  and  laboratory  expertise,
and evidence audit activities,

1983 Program

     For 1983 the  Agency  is  .allocating a  total of  $3,.281,000 and  65.2  permanent
workyears to  this  program  of  which $3,2*1,000  1s  for  Salaries  and  Expenses and
$40,000 is  for  extramural purposes under  the Abatement,  Control,  and  Compliance
appropriation.

     In the  Stationary  and Mobile  air programs,  ease preparation activities and
technical support to enforcement actions are  continuing.   Sample  permits  and emis-
sions monitoring protocols  and  requirements  are  being  developed and  testing for
violations of National Emission  Standards  for Hazardous  Air Pollutants (NESHAP) is
continuing.  Tampering  and  defect  surveys  are  also continuing.   Water  program
                                        1-29

-------
compliance evaluations  and  performance  audit inspections,  multimedia  inspections,
evaluations of remaining major publicly owned treatment  works  (POTWs)  suspected of
noncompliance, and  continuing technical  support  and  case preparation  in  major
national cases against municipal  and industrial  sources are continuing.  Investiga^
tive and analytical  capabilities  for RCRA Section 7003  and radiological  hazardous
waste evaluations  and  case  preparations  are  continued,   this  .support  includes
technical evaluation, case  preparation,  litigation support including  testimony  by
participants, participation in negotiations  to  consent decrees,  and evidence audit
and quality assurance and  case follow-up functions.   Assistance  is  being  provided
to conduct pesticide  field  investigations,  evidence  gathering,  case preparations,
use observations,  overview  monitoring  for FIFRA  Section 18 exemptions,  and tech'
nical assistance  and  training of  State  pesticide  inspectors. Technical  and  ana-
lytical  support  continues  for TSCA  case  development, quality  assurance,  evidence
audit, emergency  response,  and  criminal  investigations  as  well  as  developing TSCA
procedures for inclusion in multi-media inspection doctrines.

1983 Explanation of Changes from Budget Estimate

     There wa.s no change to this program.

1982 Accojnpljirshments

     In 1982, the  Agency  obligated a total  of  $3.,518,700   of  which  $3,489,600  was
for Salaries  and  Expenses  and $29,100  was for extramural purposes under the Abate-
ment, Control,  and  Compliance  appropriation.    This  program provided  technical
consultation and  assistance in case preparation  by  performing  background,  recon-
naissance, and file review; field Investigations;  laboratory analysis;  data evalua-
tion; report  preparation; permit writing  expertise;  technical  testimony;  and nego-
tiation of technical aspects  of consent  decrees.   Specialized  technical  assistance
was provided  to  State  and  regional  case development  efforts in  preparation  and
analysis of high hazard samples.

ENFORCEMENT POLICY AND OPERATIONS
1984 Program Request

     The Agency  requests  a total  of  $8,328,700  and 163.4 permanent  workyears  for
this program,  of which $8,128,700  is for  the  Salaries  and  Expense  appropriation
and 3200,000  is   for  the  Abatement,   Control  and  Compliance  appropriation.  This
represents an  increase  of  16.8 permanent workyears and  $1,011,500  in Salaries  and
Expenses from  1983.  The increase  is  required in  order to provide sufficient legal
support to projected civil  and criminal litigation caseload.

     The Agency's  goal  is  to  respond  to  instances of  non-compliance  in  a timely,
quality, and   consistent   fashion.   Developing,   implementing,  a.nd  updating  en-
forcement policies,  guidelineSj   and   strategies   tay  the  foundation  for  efforts
to meet thi s goal.

     Enforcement operations  include  legal   review of  administrative  orders  and
notices of  violation   or   non-compliancej  provision  of  trial  counsel  to support
administrative proceedings;  and  preparation and  management  of civil  and criminal
litigation.  These  efforts,   supported by  an automated  docket and  case tracking
system, produce  the roare tangible results of a successful legal enforcement effort.
In 1984, the Agency expects to refer 154 civil actions  to the Department of Justice
(DOJ).  This level  of  litigation, which  is an Increase  of  95% over  1982 outputs,
confirms the Agency's  aggressive  pursuit  of those violators  who create  the most
significant environmental  problems.
                                       1-30

-------
     Efforts also  include  a centralized  criminal  investigations program  that  in-
cludes preliminary inquiries,  investigations,  referrals  anc! post-referral  support.
This effort is  expected  to  yield  34 criminal referals to DOJ, a  70%  increase over
1982 levels.

     In the Abatement, Control, and Compliance appropriation, $200,000 is  request-
ed for expert witnesses in support of litigation.

19.83 Program

     In 1983, the  Agency is allocating  a total  of $7,317,200 and  146.6  permanent
workyears to  this  program,  of  which  57,117,200  is for   Salaries  and  Expenses
and $200,000  is  for  extramural  purposes  under  the  Abatement,  Control,   and  Com-
pliance appropriation.  This is the first full  year of funding for this subactivity.

     In 1983, efforts  are  being made to  improve  the overall quality and timeliness
of Agency legal  activities  in  response to problems of non-compliance.   Management
systems foster accountability and consistency of Agency enforcement actions  through-
out the country.  A prime management goal is to assure prompt resolution of identi-
fied cases  of  non-compliance..   Policies   and procedures  are  reviewed  as  necessary
to achieve this  goal  and to  assure  certainty and predictability  of Agency  enforce-
ment responses.   An automated  docket  and case  tracking  .system is used to  help man-
age the  enforcement  processes  of  the Agency  to  avoid  a  backlog  of  enforcement
actions,

     The legal  resources  allocated for  1983 are used  to   help  select appropriate
enforcement responses to instances of non-compliance that are identified in various
State, locali and  source  reports,  or through inspections and complaints,  Likewise,
legal  personnel  initiate and  provide trial  counsel   for   administrative  hearings
under the various  statutes.   Throughout  the enforcement process,  legal  personnel
participate 1n or lead negotiations with  sources  to assure resolution  of compliance
problems that are  consistent with  statutory requirements and national  enforcement
policy.  Resources provide for  the  legal  review of  and concurrence on certain admin-
istrative notices  and enforcement  orders and  proposed  administrative  penalties.
Resources are also used  for the development, initiation, and conduct  of civil  and
criminal litigation  for  all media.  It  is estimated that  some   138  civil and  26
criminal actions will  be referred  to the  Department of Justice in 1983.

1983 Explanation of Changes from  Budget Estimate

     The net increase of +$253,200 results from the following actions:

     -Con£ressiona1 Action.  (+$134,100)   This increase  includes +$134,100  of  the
5a 1 aries and" £xpenS~es" ad3-5n which  supports the  480 additional permanent  full-time
workyears provided to the Agency.

     -Reprogramnn'ngs.  (+$119,100)    During  the  development  of the  operating  plan,
several reprogrammings were  made  to  this  activity  which are not  reportable  under
the Congressional  reprogramming  limitations.   These  changes resulted  in  a  net
increase of +5119,100 to the Salaries and Expenses appropriation.

1982 Acompli shments                    "

     In 1982 the  Agency  obligated  a  total  of  $1,084,60.0 for this  program, a 1.1  of
which was for  Salaries and Expenses.  This  was  a  new program as a  result  of"  the
Agency reorganization  which  created the   Office  of Legal and Enforcement  Counsel.
These resources were  for  start-up  efforts of the  new enforcement organization  and
complemented the  legal resources  that were budgeted  for in the  various media pro-
grams.  Examples  of  legal  functions  include  the  conduct  of litigation  and  the
use of administrative  sanctions where appropriate.  In 1982, 79 civil  and 20 crimi-
nal  actions were referred to the  Department of Justice.
                                        1-31

-------
                                  INTERDISCIPLINARY

                        Interdisciplinary Technical Assistance

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1933

                                (DOLLARS IN THOUSANDS)
PROGRAM
EPA Disaster Assistance
 Salaries & Expenses


TOTAL:
 Salaries & Expenses

Interdisciplinary
Technical Assistance
TOTAL
TOTAL
$21.5
$21.5
$21.5

$21.5
PERMANENT WORKYEARS


EPA Disaster Assistance

TOTAL PERMANENT WORKYEARS
              .5

              .5
TOTAL WORKYEARS


EPA Disaster Assistance

TOTAL WORKYEARS
              .5

              .5
                                         1-32

-------
Page Intentionally Blank

-------
Toxic Substances
       SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
TOX:IC SUBSTANCES                                                             TS-1

    RESEARCH & DEVELOPMENT
       Chemical  Testing & Assessment.	   TS-7
    ABATEMENT & CONTROL
       Toxic Substances Strategies	,	,	   TS-23
          Toxics Integration..',....	,.	   TS^27
          Chemica-1  Testing..	-.	   TS-29
          Existing Chemical Review.	   TS-30
          New Chenical Review	   TS-32
    ENFORCEMENT.
       Toxic Substances Enforcement,.,	,.....-.	   TS-36
          Toxic  Substances Enforcement	>	   TS-37
          Toxic  Substances Enforcement Grants..	   TS-39
                                         TS-1

-------
                                   TOXIC  SUBSTANCES

                                ACTUAL    BUDGET      CURRENT    ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE  -
                                           1983        1983              1984  V.S  1983
APPROPRIATION
                                (DOLLARS IN  THOUSANDS)
 Salaries & Expenses
 Abatement Control  &
 Compl iance
 Research & Development

TOTAL, Toxic Substances
$32,694.1  533,852.3 -534,182.0  532,900.5  -31,281.5
$27,987.8  522,603.0  $22,603.0  $21,970.3    -$632.7

$22,030.9  512,148.7  512,876.8  $11,804.9  -$1,071.9

$82,712.8  $68,604.0  $69,661.8  $66,675.7  -$2,986.1
PERMANENT WORKYEARS
TOTAL WORK YEARS
OUTLAYS
AUTHORIZATION LEVELS
    634.4      607.7      626.7      606.2      -20,5
    729.5      687.7      706.9      683.2      -23.7
$82,211.0  $80,130.3  $79,915.0  571,368.0  -$8,547.0
553,646.0  $62,000.0  $62,000.0            -$62,000.0
                                       TS-2

-------
                                TOXIC SUBSTANCES


OVERVIEW  AND .STRATEGY

      The  Toxic  Substances  program .strategy  is  designed  to produce a highly  focused,
cost-effective  program  which will  reduce  unreasonable  risk  of  harm  to health and
the  environment caused by potentially  toxic  chemicals.   After an initial  start-up
period, the  five years prior  to  1982,  Toxic  Substances  Control  Act (TSCA) imple-
mentation has  taken a firm  direction.  The  1984  strategy builds on this framework
and,  through  the  identification  of  several  major  cross-cutting  themes,  estab-
lishes  priorities  across the various  TSCA activities.

Program Improvements Continue

      In 1984,  resources  will be focused on meeting and enforcing the statutory re-
quirements of  TSCA and preventing  the creation  of  backlogs.   Efficiencies built
into  the  program in 1982  will  have eliminated all backlogs  in  early 1984.  These
efficiencies, as  well  as  other anticipated changes  in 1983, that  will  integrate
the  various  key sections  of TSCA as they  were originally  intended,  have been in-
corporated into the 1984  program  and  will  result in  higher  productivity  and in-
creased outputs with  slightly  fewer resources...

      The  Agency will  continue  to use both  formal  rulemaking  and other nonregula-
tory  risk reduction tools.  We will  develop,  implement,  and  refine cost-effective
enforcement strategies  that ensure  compliance with  formal and  informal  controls
at minimum  cost.   In  addition,  we  will  continue to  initiate  regulatory reform
activities aimed  at minimizing Industry burdens  in the areas of  new and existing
chemicals, while maintaining health and environmental protection.

      In 1984, all  regulatory decisions will  be  supported with clearly articulated
and  peer-reviewed  scientific documentation.   This  will  provide  interested  parties
with  the  rationale for EPA  actions.    Interaction  with  industry,  small  business,
labor and public  interest  groups will  remain  an  established  part of the decision-
making  process.

      Duplicative toxic  substances  regulatory efforts  will  be  minimized  by  this
and  other agencies, under different  statutes, by  pursuing  a vigorous integration
effort.   By using  existing integration tools  such as multi-media chemical  strategy
work  groups, we are better able to  formulate  national policy  and make decisions on
toxic chemicals in  a technically  sound  and  consistent way.

      Overall, the  Agency's  efforts  focus   on  six  broad  program areas  to   achieve
environmental results.  These  programs  include:  review of  new chemical substances
prior to  manufacture;  development of  rules or negotiated agreements for testing of
chemicals by industry; risk  assessments and control of  existing chemicals;  integra-
tion  of agency  chemical control; enforcement .of rules and orders  issued .under TSCA;
and,  a  Research and Development program to support regulatory efforts.  Throughout
the  Tox.ic Substances  program,  these  efforts are carried  out  in  a variety of ways.

      The  major  focus  for  the Chemical  Integration program  will   be  on  work groups
that  develop multi-media  chemical  strategies.  The  strategies  developed  by these
work  groups  help  coordinate  scientific  assessments  of  the  chemicals,  determine
if control  is   necessary,  and   if  so,  under  what  statute—thereby  avoiding need-
less  imposition of regulatory  control.  In  1984,  the .Agency also  plans  to main-
tain  and  update tools for integration  such  as the Chemical Activity Status Report
and  the Extramural  Activity Report which  provide  comprehensive  reports  of chemi-
cal control  activity  in all media  arvd support many  other integration mechanisms.

      In the  Chemical  Testing  program,  the  Agency  has shifted  resources  from the
test  guidelines program,  where the  emphasis  will  be on the  statutorily required
review  and updating of guidelines,  to the  area of  test  data development.  Resources
                                         TS-3

-------
 in  the  test data development area will  support  the  audit  of data  developed on In-
 teragency  Testing  Committee (ITC) designated chemicals.   The  shift  away  frora test
 guidelines is  possible  because  the major  development  stage,  based  on  currently
 available  testing methods,  is concluded.

     Early in  1984,  the Chemical Testing program  will  mark the completion of the
 final 13  backlog chemicals  designated for priority  testing consideration  by  the
 ITC  as  required by the  court  ordered  schedule.   A major  effort will  focus on re-
 sponding to  the ITC  on the llth  and 12th  priority lists,  within the one-year time
 requirement, and preparing  analysis to  respond to  the 13th and 14th lists.  Testing
 of  chemicals previously  designated  by  the  ITC  will begin to generate large quanti-
 ties of  test data to  be reviewed  for compliance  with rules and  agreements,  and
 referred to  the Existing  Chemical  Review  program  for risk evaluation.   Also  in
 1984, the  Agency plans  to develop proposed  test  rules  or negotiated testing .agree-
 ments oh  chemicals  of  concern  identified  through the  new and existing  chemical
 programs.   The  test  rule program  will  provide  a  vital  link  between the  new and
 existing chemical  programs..  When  chemical  classes of concern  are  identified  in
 the  PMN program, the test rule program  is used to  obtain needed data on the related
 classes of existing  chemicals.   Such  action is  necessary  to ensure EPA  activities
 do  not  result  in the substitution of equally or more hazardous products.

 ExistingChemical Review Program Redirected

     The Existing  Chemical   Review  program  effort has  been redirected  from past
 attempts to  develop  comprehensive analyses of all  effects and exposures of  a  few
 selected chemicals.  The new program  will  review  and  evaluate a  larger  number  of
 existing chemicals focusing on  necessary control  of specific  problems  that may  be
 posed by a given activity with the chemical.  The Agency will give primary attention
 to  evaluating and controlling existing  chemical problems  identified  through specific
 TSCA mechanisms,  such  as Section 8(e)  "substantial  risk"  notices,  chemicals found
 to  produce  adverse effects  in testing  performed in  response to  recommendations  of
 the  ITC committee, and petitions received under Section 21.  We  expect to receive
 200  studies  from the Section 4 testing program in  1984.

     The major  changes  In the New Chemical  Review program will be the reduction in
 the  number  of new chemicals that will   require full  premanufacture review.  The rate
 of  premanufacture  notice (PMN)  submissions has not leveled  off;  in fact,  it  is
 estimated  that  the Agency will receive  1,300 new chemical notices in 1984, compared
 to  approximately 800 in 1982.   Of the  1,300  expected  new chemical  notices,  660
 will undergo a  full  PMN review.   This  review will   involve  a greater proportion  of
 detailed scientific  reviews than  in 1982  because trtis  segment of the population  of
 new  chemicals  is more  likely to have  tpxicity concerns.   The  remaining  640 appli-
 cants will  be reviewed under the low risk exemption program.

 Compliance Monitoring Support Increases

*    The Enforcement program will increase support for  regional compliance monitor-
 ing, analytical  and  case development  activities.    This  Increase  will  enable  the
 Agency  to  monitor  compliance  with  new TSCA rules  promulgated  1n  1983  and 1984,
 while maintaining  the  1983  level  of  monitoring for rules  existing  prior  to that
 year.   Included  will  be inspections  of  facilities  subject  to  chemical  control
 regulations: polychlorinated  biphenyls '(PCB)  marking and  disposal;  the  PCB rules;
 the  chlorofluorocarbons  (CFC) rule; asbestos-in-schoo1s  and  other rules.

 Research and Development                                                      '

     The Toxic Substances Research and  Development  program is comprised of a mixture
 of  disciplinary  activities  that will provide information and methods needed to con-
 tinue implementation of  TSCA.   Research efforts will  directly  support the  goal  of
 the  Office  of  Toxic  Substances  to  protect  human health and the  eiiviroiwient while
 minimizing  the  Impact  on industry  by  providing analytical  methods,  models,  field
 monitoring  systems and associated  quality  assurance protocols  needed  to  maintain
 a data base of  the highest  possible quality.
                                        TS-4

-------
                                  TOXIC SUBSTANCES
Program Activities

TOXICS INTGEGRATION
No. of Intermedia
 Priority Pollutants
 produced or updated .
Multi-media chemical
 strategies completed

CHEMICAL TESTING
Test Rules Proposed/
 Negotiated Agreements
Test Rules Final .  . .
Test Guidelines
 published 	
EXISTING CHEMICAL REVIEW
Substantial Risk	
 Notices reviewed. . . .
Test Data Studies
 reviewed	
Risk Assessments ....
Negotiated Control
 Agreement/Risk
 Management Advisories
Proposed/Final §6 Rules.
Exemption Requests
 Proposed/Final	
Section 8 Information
 Collection Rules/
 Agreements	
Significant New Use Rules
 Proposed/Final	
PCB Disposal  Permits
 reviewed	

NEW CHEMICAL REVIEVJ
PMN Notices Processed. .
PMN Risk Assessments . .
PMN Notice Withdrawals/
 Negotiated Agreements/
 Section 5(e}/(f) Orders
§ 5(h)(4) Notices Reviewed
Section 5(h)(4) Exemption
 Rules Proposed/Final. .
New Chemical  Significant
 New Use/§8(a) Rules . ,

TOXICS ENFORCEMEMT
Inspections under § 4
Inspections under I 5
Inspections under § 6
Inspections under § 8
Inspections under I 12/13
 Actual
  1982
  19

   1
   7
   0

  96
  45

  95
   4
 839
  15
  27
   0

   4

   0
   0
  33
2164
  17
   0
 Budget   Current
Estimate  Estimate
  1983      1983
   14
   11

   65
   75

    *

    1


    *
    2
 1000
   40
   23
    *

   10

    1
  125
  265
  875
  100
  215
  15
   3

  16
  50

 100
   3
                        3

                        3

                       40
1000
  40
  23
  40

   8

   6
  40
 265
1332
 200
 100
          Estimate
            1984
 28
  6

 12
 50

200
  5
                                   5
                                   2

                                  60
                         3

                         3

                        40
660
 60
 40
640

  3

  5
125
295
960
175
715
          Increase +
          Decrease -
         1983 vs.  1983
 + 13
  +3

  -4
HOO
  +2
                          +2
                          -1

                         +56
-340
 +20
 +17
+600

  -5

  -1
 +85
 +30
-372
 -25
+615
  New category for 1984 budget.  I
                                       TS-5

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Tab 1 e of C o n te n t s



                                                                             Page

TOXIC SUBSTANCES

    RESEARCH & DEVELOPMENT
       Chemical Testing 8 Assessment...	   T/S-7
                                       TS-6

-------
                                   TOXIC SUBSTAMCES

                            Chemical  Testing A Assessment
                                ACTUAL
                                 1982
                  BUDGET
                  ESTIMATE
                    1983
CURRENT
ESTIMATE
  1983
ESTIMATE  INCREASE +
  1984    DECREASE -
         1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Scientific Assessment
Salaries & Expenses
Research & Development
TOTAL
Technical Information &
Liaison
Salaries & Expenses
Research 4 Development
TOTAL
Monitoring Systems &
Qual ity Assurance
Salaries & Expenses
Research <5 Development
TOTAL
Health Effects
Salaries & Expenses
Research & Development
TOTAL
Environmental Engineering
& Technology
Salaries & Expenses
Research & Development
TOTAL
Environmental Processes
& Effects
Salaries & Expenses
Research & Development
TOTAL
Stratospheric
Modification
Salaries & Expenses
Research & Development
TOTAL
National Center For
Toxicological Research
Research & Development
TOTAL
TOTAL:
Salaries & Expenses
Research & Development


SI
S4
$5
$3
$7
Sll
$1
51
S5
S6
$12

SI
SI
$12
$22
$77
$20
597
$270
$270
,710
,055
,765
,435
,898
,334
S520
,269
,790
,956
,681
,638
$142
$765
$907
,340
,340
,114
,030
.5
.0
.5
.9
.9
.5
.4
.9
.9
.3
,2
.9
.8
.7
.8
.6
.4
.3
.6
.9
.2
.2
.8
.9
$161
$75
$236
$170
$21
$192
$1,856
$3,611
$5,468
$S,556
$3,455
$9,012
$384
$142
$527
$6,239
$3,189
$9,428
$130
$742
$873
$910
$910
$14,500
$12,148
.4
.0
.4
.5
.9
.4
.2
.8
.0
.6
.8
.4
.9
.7
.6
.8
.1
.9
.7
.4
.1
.0
.0
.1
.7
$161
$325
$486

$1,856
$3,611
$5,468
$5,556
$3,580
$9,137
$384
$142
$527
$6,239
$3,564
$9,803
$130
$742
S873
$910
$910
$14,329
$12,876
.4
.0
.4

.2
.8
,0
.6
.8
.4
.9
.7
.6
.8
.1
.9
.7
.4
.1
.0
.0
.6
.8


$1
$2
$4
$3
$6
$9

$6
$1
$8


$11
$11
S170.
S75.
$245.

,716.
,856.
,572.
,657.
,191.
,848.

,288.
,940.
,228.
$132.
$742.
$875.

,964.
,804.
3
0
3

0
1
1
2
4
6

3
0
3
7
4
1

5
9
$8.9
-S250.0
-$241.1

-S140.2
-$755.7
-$895.9
-$1,899.4
$2,610.6
$711.2
-S384.9
-$142.7
-$527. 6
$48.5
-$1,624.1
-$1,575.6
$2.0
$2.0
-5910.0
-$910.0
-$2,365.1
-$1,071.9
Chemical Testing
& Assessment
TOTAL  $34,145.7  $26,648.8  $27,206.4  $23,769.4  -$3,437.0
                                         TS-7

-------
                                   TOXIC SUBSTANCES

                            Chemical  Testing 5 Assessment

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                         ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             193* VS 1983

PERMANENT WORKYEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Engineering
& Technology
Environmental Processes
& Effects
Stratospheric
Modification
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Scientific Assessment
Technical Information &
Liaison
Monitoring Systems &
Quality Assurance
Health Effects
Environmental Engineering
& Technology
Environmental Processes
& Effects
Stratospheric
Modification
(DOLLARS II

1.5
4.6
28.5
39.8
10.1
81.3
.5
166.3

2.5
6.6
29.4
45.7
11.7
94.8 -'.
1.3
N THOUSANDS

2.5
1.1
23.2
49.1
5.3
70.5
1.8
153.5

4.0
2.3
27.1
55.1
6.2
89.2
1.8
)

Z.5 2.5

22.6 23.2 .6
49.1 49.1
5.1 -5.1
69.7 68.5 -1.2
1.8 1.8
150.8 145.1 -5.7

4.0 ' 4.0

25.4 27.1 1.7
55.1 55.1
6.0 -6.0
88.4 87.2 -1.2
1.8 1.8
TOTAL WORKYEARS
192.0
185.7
180.7
175.2
.-5.5
                                         TS-8

-------
                                  TOXIC SUBSTANCES
                              Chemical  Testing and Assessment
Major Outputs/Milestones

Develop and Validate Test Methods

-  Revise and update mutagenicity
   and cancer guidelines
   (Scientific Assessment)

-  Provide immune fun-ction tests
   in perinatally exposed mice,
   and in adult mice (Health)

-  Report on acute test round robin (Env.
   Processes)

Develop and Validate Methods to
Predict and Monitor Exposure

-  Report on TEAM Study (Monitoring)

-  Final project report - Test of EXAMS in
   Iowa reservoirs (Env, Processes)

Develop and Validate
Risk Assessment Methods

-  Provide journal  article on
   known/suspected human carcin-
   ogens as characterized by
   genetic test procedures (Health)

-  Provide extrapolation models
   for estimating neurotoxlc
   risk to human (Health)

Perform Technical Evaluations and
Scientific Assessment

-  Completion of Lifecycle Emissions/
   Release studies (Env. Engineering)

-  Publication of PCB Guidance
   Documents

Develop Structure-Activity
Relationships

-  Validity'of existing SAR models in
   predicting bioaccumulations of toxics
   in marine biota (Env. Processes)
 Actual
  1982
Current
Estimate
  1983
 9/84
12/82
12/83
 9/83
10/88
  9/84




 12/82




  6/83


  3/83




  9/83




 10/88
Estimate
  1984
                            5/84
  9/84
  9/83
 10/88
 9/83


10/82
  9/83
10/82
10/82
                                        TS-9

-------
                                  TOXIC SUBSTANCES
                          Chemical Testing and Assessment
Major Outputs/Milestones

Develop Methods and Provide
Quality Assurance

   Guidelines for Field Testing
   Soil Transport Models
   (Monitoring)

Assess Stratospheric Modification

-  Third biennial research report
   to Congress

-  Work on fourth biennial
   research report to Congress
Actual
 1982
 Current
Estimate
  1983
Estimate
  1984
                            1/84
               2/83
                           10/84
                                         TS-10

-------
                                  TOXIC SUBSTANCES


                            Chemical  Testing and Assessment
Budget Request
     The Agency requests  a  total  of 323,769,400 and  145.1  permanent workyears for
1984, a decrease of 33,437,000 and  5.7  permanent  workyears from 1983.  Included in
this is Sll.964,500  for  Salaries  and  Expenses  and  $11,804,900  for  Research and
Development, with  a   decrease  of  52,365,100  .and  51,07.1,900,  respectively.   The
decrease prinarily  reflects a reduction  in monitoring  and quality  assurance and
environmental processes  and  effects.   In  addition,  the  decrease   reflects  the
transfer of  31,219,600  in  exploratory  research   funds  to  the  Intermedia  program.

Program Description

     The Chemical  Testing  and Assessment  research  and development  program  is the
Tox.ic Substances  research  program  that provides  the Office  of Toxic  Substances
(OTS) with  the  scientific  tools to  implement the Toxic  Substances Control  Act
(TSCA).  The major needs  and  objectives  of EPA's  toxic  substances research efforts
which support TSCA activities are as follows:
     Objective 1 . pgvj|loP^a.^vV.^ljate Test_Methods...That Identify and Assess Health
and Environmental ........ Hazards  of £hemi c'al s Under T JCTI  The purpo se  of tfii s ob j ec tive
is to develop and  validate  environmental  and human health effects tests and define
the bounds  of  reliability for  such  tests so that  OTS can use  them  in their test
guidelines.  OTS publishes  test guidance  to assure  that  industry test  data  will
adequately identify  and  assess potential  environmental  and  health  hazards due to
exposure to chemicals.

     Objective 2. r  Develop  and Validate Methods to Predict and  Monitor  Human and
Envi rcmmental  Exposure :' WjChetnic'al s Under TSCA.  The  purpose of this objective TT
to identify major  transport  and transformation! processes and to develop validated
models and monitoring  methods  and  data bases so that  we  can  document and estimate
human and environmental exposures to chemicals.

     Objective 3.  Develop  and  Vali date Improved Risk Assessment Methods for TSCA
Studies"!  The "purpose"' of this ; objective is to develop TieaTth risk assessment methods
that are more reliable and  economical than existing methods and to develop methods
necessary to evaluate major health effects for which no adequate assessment methods
exist.                                                      '

     Objective 4.  Perform  Technijral Evaluations  and Scientific  tesessments  and
Control Quality of Agen^Ril;^^
vide sc 1 eh ti f i c e v a 1 
-------
     Objective 7.  Assess Stratospheric Modification.   The Clean Air Act Amendments
of 1977 require assessment of the environmental ""antTheal th effects of stratospheric
modification due to changes  in  the  ozone layer.  The puroose of  this  objective  is
to investigate the health  and  environmental  consequences of lower  levels  of  ozone
and anticipated increased exposure to ultra-violet radiation.

SCIENTIFIC ASSESSMENT
1984 Program Request

     The Agency reouests a  total  of S245.300 and 2.5 permanent  workyears  for this
program, of which $170,300 is for Salaries and Expenses  and $75.000 is for  Research
and Development.  This reflects an increase of $8,900 for Salaries and Expenses and
a decrease  of  5250,000 for  Research  and Development.   This  decrease of  5250,000
reflects completion of several  projects in 1983.

     Perform  Technical Evaluations and  Scientific  Assessments and Control  Quality
of Agency Risk Assessments. In 1984, the Scientific  Assessment program will  improve
the Agency's risk assessment methods by developing more  accurate and cost-effective
methodologies.  The program will  focus  on  the  (1) identification  of scientifically
advanced methods and  (2)  identification of  more scientifically  accurate  and less
costly methods.  Additionally,  based  on the  results of  1983  case studies  of the
Program  Integration  Project's   industry-by-industry   assessment  approach,  the
Scientific Assessment program  will  participate in the  efforts to  inodify the risk
assessment methodology.  The  program  will  also  continue  its efforts  to  provide
uniform risk assessment methodologies  for the Agency.

1983 Program

     In 1983,  the  Agency  is allocating  a  total  of  3486,400  and  2.5  permanent
workyears to  this  program  of  which $161,400  is under  the  Salaries  and  Expenses
appropriation and  $325,000  is   for  extramural  purposes  under  the  Research  and
Development appropriation.

     Perform Technical Evaluations  and Scientific Assessments and Control   Quality
of Agency Risk^AssessroentsTIn 1983,  the Scientific  Assessment  program  is  contin-
uing itsefforts  toachieve  uniform  Agency  risk   assessment   approaches.   This
program is completing an exposure assessment handbook for Agency use which  explains
the appropriate exposure techniques used to assess the major types of environmental
problems.  The program is assisting the  various  Agency  programs in documenting the
production, use and disposal  of  toxic  chemicals.   The  program is  also  completing
case studies that attest the validity of the Program  Integration Project's industry-
by-industry risk assessment approach.

1983 Explanation of Changes from Budget Estimate

     The net increase  of +5250,000 results from the  following  action:

     -Congressional Action.  (+$250,000)  Congress added  +58,526,200 to the Research
and Development  appropriation  for  priority activities  at the  discretion  of the
Agency.  This specific increase supports methods  to  assess  risk from toxic chemicals
at low doses.                           '

1982 Accomplishments

     In 1982, the  Agency obligated a  total  of $97,500  for this  program,  of which
$77,500 was  under  the  Salaries  and  Expenses  appropriation  and  520,000  was  for
extramural  purposes under the Research and Development appropriation.

     Perform  Technical Evaluations and  Scientific  Assessments and Control  Quality
of Agency Risk Assessments.THe1982ScientificAssessmentprogramaccomplished
(1J preparation of  the first  draft of a carcinogen policy document for OTS,  (2) pre-
paration of risk assessment documents of ethylene oxide  and chloroform,  {3}  review
of a PC3 document for  reproductive effects, and (4) assistance in the development of
methodologies for screening chemical mutagens.
                                        TS-12

-------
TECHNICAL INFORMATION ANQ LIAISON

1 98 2 Ac c cmpj^hmen ts

     In 1982,  the  Agency obligated a  total  of S270.900  for this program, all  of
which was  under  the  Salaries  and  Expenses  appropriation.   This activity,  which
supports research programs across  all  media,  was consolidated  into  the  Intermedia
program in 1983.   Thus, the Program Description, 1984 P r o o r ajn_ _Re q u_e s t ,  19.83 Program
and 1982 Ace omplishments narrative sections appear there.

MONITOR I NG_jYSTEMS AND QUALITY ASSURANCE

1984 Program Request

     The Agency  requests  a  total  of $4,572,100 and  23.2 permanent  work  years for
this program,  of which 51,716,000 is  for  Salaries and  Expenses  and $2,856,100 is
for Research and  Developinent,-  This  decrease of $140,200 and  5755,700, respectively,
reflects both  the  completion  of the  Total  Exposure Assessment  Methodology  Field
Study (TEAM) in 1983 and transfer of the Exploratory Research program to  the Inter-
media program.

     Dey e 1 OP a nd  V a 1 j da te Methods _ to P re d i c t  and Mo n i tor  Huina n a n d E ny i r o nme n ta 1
,E xpo s u re" W jBem 1 c a I s u rvflle r "TSC fri  The exposure morii tori ng  research ef f ort eSpha-
sizes developing (1)  monitoring  data  directly  related to  exposure measurements to
corroborate the  limited  laboratory and  model  data used  in risk  assessments,  and
(2) monitoring systems  and  approaches  capable of  linking  environmental  concentra-
tions of chemicals to human  exposure.  A field test to evaluate exposure monitors,
sampling protocols and  data  analysis  techniques developed  in prior years  will  be
initiated.  The  program will  continue  to  develop  improved statistical  tools to
aid in  the  design and  analyses  of exposure  monitoring programs.  This  research
supports OTS in its assessment and regulation of existing chemicals.

     Develop Methods and ...Prov^e QMaH^._Asjurjmc_e for TSCA Data .and Analytical Ac-
tivities.  The ""Agency "cSntiiiues "to  Fos ter  new  and i mproved measurement methods and
quality assurance.   Methods   will  .be  developed  and  evaluated  for sampling  and
analyzing volatile  organic  compounds  which  are  currently  difficult  to  isolate.
Specifically, new pattern  recognition  approaches to  analytical  instrument outputs
will be evaluated  so that we  can reduce data  to more manageable proportions,  'die
will continue  research  on  various .cryogenic  approaches and new collector materials
for sampl ing heavier compounds  in air; this will enable  us  to  expand the  number of
chemicals that we can monitor.   A number of  direct methods  for analysis  of organic
compounds which are  contained in particulate matter  will  be examined in  order to
reduce both the  time  and cost  of  such analyses.   The quality  assurance  area will
emphasize protocols  for  biological  measurements  thereby  recognizing  the  increasing
reliance of the  Agency  on these  methods.   We will  conduct field work  to develop
guidelines that will  be  used in validating soil models;  this  class  of models -will
soon be  ready  for validation,   A  protocol and report on  assessing  asbestos  fiber
reduction techniques  will  be published; this  will  enable  us  to  assess  the effec-
tiveness of asbestos  clean-up operations.   Laboratory audits will be  conducted as
needed and a  standard reference bank  for material  and  spectra  will  be maintained.

1983 Program

     In 1983,  the  Agency is  allocating  a total  of S5, 468, 000 and  22.6 permanent
workyears to this  program, of which $1,856,200 is  under the Salaries  and Expenses
appropriation and  $3,611,800 is  for  extramural  purposes  under  the  Research  and
Development appropriation.

     Develop Methods and Provide Quality Assurance for TSCA Data and Analytical Ac-
           Me mods ; 'tor  sampling  ana analyzing  volatile organic compounds are Being
                                               '
tested ." We will  finalize  guidelines  that will 'be used  in  the  field  validation of
stream models that predict fate and transport of  chemicals  and  chemical  compounds.
The audit  program  for the asbestos  in school program  is continuing, and  quality
assurance protocols  and  standard  reference  materials   are  being  provided  for  a
number of studies and field activities.
                                         TS-13

-------
     Develop  and Validate Methods to Predict and  Monitor Human  and Environmental
Exposure  -Q tne^icais uriger .syA.Tne  Agency  r§currentlycol iectingdata  trorr,
the second city  of  the  two  city  Total  Exposure Assessment Methodology  Field Study.
The data  will  be used to evaluate the  effectiveness  of  using personal dosimeters,
biological samples,  and  population   activity  questionnaires  to  obtain  improved
exposure  data  in humans.   The  Agency  is  also  initiating  development  work on  a
number of  improved  statistical   approaches  and  data  handling  techniques  for  pre-
dicting and monitoring  human  and  environmental  exposure  to  chemicals.   In addition
technical assistance for a number of Agency exposure assessments is being provided.

1983 Explanation cf Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982,.the  Agency  obligated   a  total of  55,765,900  for  this   program,  of
which SI,710,500  was  under  the  Salaries and Expenses  appropriation  and $4,055,400
was for  extramural   purposes  under  the  Research  and Development  appropriation.

     Develop and Validate Methods to Predict and Monitor  Human  and  Environmental
Exposure  to Ch.emica 1 s under TSQA"  The  program has  completed  the  field work on the
Southeast Ohio exposure Methods  Study.  Data  was  used  to  publish  a  protocol  for
soil sampling.   In addition data was  collected from the first  city  of  the two  city
TEAM study  to test  the  methodology  for  measuring  personal  exposure.   Valuable
field support was also provided  OTS for the lead assessment study in Dallas, Texas.

     Develop Methods and Provide Quality Assurance for TSCA Data and Analytical  .Ac-
tivities',Some  oO  new collector materials  for  sampling heavier  compounds in  air
were synthesized  and  evaluated.   A   revised method  for analyzing  bulk  asbestos
was published.   Field work  to revise the interim guidelines  for  validating stream
models was completed.   Technical  support In the  form of standard reference material
and laboratory audits was provided.

HEALTH EFFECTS

1984 Program Request

     The Agency requests a total  of 39,848,600 and 49.1 permanent workyears for this
program, of which  $3,657,200  is  for  Salaries and Expenses, and $6,191,400  is  for
Research and Development.  This  reflects a decrease of $1,899,400  for  Salaries and
Expenses and an  increase of $2,610,600 for Research and Development, for an overall
increase of $711,200.  This decrease  results from  an  accounting  change.  Formerly,
nany of the on-site research  support  contracts were funded  out of the  Salaries and
Expenses appropriation; the transfer will allow the Agency  to  fund these contracts
from a more  appropriate  source,  the  Research  and Development appropriation.   In
1984, the health  program  increased  resources for research  to  improve  the Agency's
ability to quantify risk.   We transferred  Exploratory  Research funds to the Inter-
media program.

     Develop and Validate Test Methods That Identify and Assess Health  and Environ-
mentai  Hazards of Chemicals Under TSCA.  Health  effects test  guidelines are needed
for test  rules specified  under  Section 4 of TSCA, to define testing data deficien-
cies under  Section  5,  and  to meet  the statutory  requirements  of  Section 10(e).
Existing guidelines contain deficiencies and gaps  that must be addressed if we" are
to provide reliable,  scientific  guidance  to industry  for  test rule  development.
Work will focus on two areas of concern  to OTS:  inexpensive and short-term screening
tests,  and longer-term tests and  systems for  the tier-testing matrix.  This research
includes emphasis  on   the   relationship  of  animal   test  data to  human  systems.
                                         rs-14

-------
     Develop andValidate  Improved  RiskAssessment  Methods  for  TSCA  Studies.
Re.search' wiI i	aciciress sotne ot the signiti'cant gaps"in tne risk1 assessment 'methoaoi-
ogies.  Current methodologies,  for  the  most part,  have  been essentially limited to
cancer risk;  and,  many  existing methodologies are  incompletely  validated.   Both
qualitative and quantitative  procedures  need  to   be  improved to  extrapolate data
from animal studies  to  human risk.  An  important  area  of  research  inquiry  is the
attempt to predict heritable genetic effects of environmental chemicals.

     Perform Technical _£va1uations  and  Scienti fie Assessments and Control Qua! i ty
of Agiricy7'RTsk'' "AssesTnientr]  STs  performs  evaluations   "of   exposure  to  chemicals
andas senses the n s'k ' tha t can result from  such exposure.   Scientific  assessments
and data collection support this process.

     Technical and  scientific  assessment  support  will  continue; but,  there will
be additional  emphasis  on integrated,  uniform assessment  guidelines  for heritable
diseases.  As part  of  a  strategy  to  institute uniform assessments,  methods  for
carcinogenicity and  mutagenicity  assessment will  be  evaluated  for  the  Program
Integration Project.  We will improve risk assessments in the area of extrapolation
of data  from  rapid  mutagenic  tests  to  predict   carcinogenic  effects   in  various
manwialian species.    Research is  also   being  oriented  toward validating  existing
methodologies and toward  addressing those areas other  than carcinogenicity, where
significant gaps exist.   Additionally,  technical studies will  be conducted for OTS
on specific health issues and hazard risks of chemicals.

     Develop Structure Activity  Fate  andI  Effects  Relationships  in  Support  of
Premanufacturingj'nci few"'₯se: Reviews.  Estimate's 'of ne'atth  eiTfects'are  part 'of the
PMN reviews under Section  5  of TSCTu   The  computerized  SAR techniques will Improve
the scientific accuracy  of,  and  will  streamline,   the Agency's  new chemical   review
process.  We will continue to emphasize  development of the structure-activity model.
SAR will also improve OTS's  ability to  limit testing  of existing chemicals to only
the necessary tests,

1983 Program

     In 1983,  the  Agency  is  allocating a  total  o.f $9,137,400  and  49.1 permanent
workyear.s to this program,  of which S5,556,600 is  under the Salaries and Expenses
appropriations,  and $3,580,800  is   for  extramural  purposes   under  the  Research and
Development appropriation.

     Develop  and  Validate  Test  Methods  That   Identify   and  Assess  Health and
Environmental  Hazards of Chemicals Under TSCA.   Research to  date he's  significantly
expanded the basTc" state^of-tfie-art in  testing knowledge.   Basic development has
been accomplished for health effects test guidance  in the several-  areas of toxicol-
ogy.  Work has also  begun to  relate how to extrapolate animal  test  data to human
systems.  This information would enable OTS to evaluate human -health risk by  relat-
ing chemical exposure to internal dose-response of humans. -

     Develop and Validate  Improved Risk Assessment Methods   for  TSCA  Studies.  In
the area of  ri sic  assessments, • improvements nave   been  made  in  extrapolating data
from rapid mutagenic  studies  to  determine  carcinogenic  effects in various mammlian
species.  Research will  be oriented toward  validating existing  methodologies and
toward addressing those  areas other  thgn  carcinogenicity  where  significant gaps
exist.

     DevelopStructure Activity	Fate  and  Effects  Relationships  in  Support  of
Premanufacturing' ana"T>tew' ' i3se'''WyTews~Researcn to date on SAK  p r o vfdesvi evi"denee
that computer simulated  metabolism  of organic agents  is  feasible  for predicting
toxic health effects.   Structure-activity methods  are now  being developed for the
rapid toxicity and fate  screening of chemicals and for extending toxicity evaluation
methods to additional  classes of chemicals by comparative techniques.
                                         TS-15

-------
     Perform Technical Evaluation and Scientific Assessments and Control Quality of
Agency RTSKXsselsmefi'tsTOKU is provicnnginswitn nsK catcu rationconsultations,
such as estimates of  release rates for chemicals, on a systematic basis and is pro-
viding guidance to support the development of test rule documents.

1983  Explanation of Changes from Budget Estimate

     The net increase of +-$125,000 results from the following action:

     -Congressional Action.  ( + $125,000)  Congress added +$8,526,200  to  the Research
and Development' appropriation  for  priority  activities  at  the discretion  of the
Agency.  This  specific  increase  supports  bioas.says of chlorinated hydrocarbons and
structure-activity relationships to predict behavior of new chemicals,

1982 Accomplishments

     In 1982,  the  Agency  obligated  a total  of 511,334,200  for this  program,  of
which $3,435,900 was  under the Salaries and  Expenses  appropriation  and 57,898,300
was for  extramural   purposes  under  the  Research  and  Development  appropriation.

     Develop and Validate Jest Methods That I denjify jnd Assess Health and Envir.on-
me_ntaT~Hazards" of Oiemfcals Under TSCA.  Initiajphases of test methods development
TiaVeTprovided  a number of methods which have  expanded chemical testing capabilities.
For example, the Agency  also developed an in vitro mammalian  assay  system that is
capable of  simultaneously  detecting  gene mutatioris  and  chromosome  .mutations.  We
also performed  studies  to  evaluate how toxic  chemicals  affect  the  immune system.

     Develop and ValidateImprovedRisk Assessment^Jethodsfor TSCA  Studies.  The
program developed animal  mode Is to  predict  the perTpheiraT	nieiirbtpxicity of chemical s
in humans.  The program also developed jnvit.ro methods which enable us to determine
potential carcinogenic and mutagenic  effects of volatile gases by exposing mammalion
cells to these agents.

     Develop  Structure Activity Fate and EffectsRelationshipsin Support ofPre-
manufacturing Jridjiew Use Reviews".   S  data  management  sy stern  wa s  de veTopedto
store and  analyze   research  information  on  genetic  and  other  toxic  effects  of
chemicals.

     PerformTechnicalEvaluationsand Scientific Assessments  andControlQuality.
of Agency j1^sk^A₯sejsmenTsI  Studveswere performed that demonstrated' that"the"size"
of fibers has  a correlation  to tumor  growth  in mice.   The laboratories also tested
sevepal chemicals for mutagenic and carcinogenic effects.

ENVIRONMENTAL ENGINEERING AND TECHNOLOGY
1984 Procjram Request

     The Agency  requests no  resources  for  this program  in 1984.   The Hazardous
Waste research  program  has  process  specific  information  and  engineering  assess-
ments which OTS can use.

1983Program

     In 1983,  the Agency  is  allocating a  total   of  5527,600  and  5.1  permanent
workyears for this .program,  of which  $384,900  is  under the  Salaries and Expenses
appropriation .and  $142,700   is  for  extramural  purposes  under  the  Research  -and
Development appropriation.

     Perform Technical Evaluations and Scientific Assessments.  OTS  utilizes  pro-
cess specific information and  engineering assessments  to estimate  release ra.tes of
new toxic  substances  as part  of  the PMN review process, which  is specified under
Section 5 of the TSCA and for enforcement activities.  ORD has concentrated its ef-
forts on three areas:  PMN reviews,  life cycl* emissions/release  studies of dyestuffs
and technical support.
                                         IS-16

-------
1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomp1i shments

     In 1982, the Agency obligated a total of $1,790,700 to this  program,  of  which
5520,900 was under  the "Salaries  and  Expenses  appropriation and SI,269,800  was  for
extramural purposes under the Research  and Development appropriation.

     Two guidance documents  were produced  for   State  and  Regional  implementation
of PCB  disposal  regulations  under the  Toxic  Substances Control  Act: (1)  a  draft
report covering  interim  guidelines  for the  disposal/destruction  of  PCBs  and  PCS
items by  non-thermal methods;  and  (2)  a report  on  Guidelines for the Disposal  of
PCBs and PCB Items  by Thermal  Destructions.  Additionally, literature  reviews  were
published and the  engineering  consultations  were  conducted  for more  than  150  PMN
notices; and, enforcement support was  provided.

ENVIRONMENTAL PROCESSES AND EFFECTS

1984 Program Request

     The Agency  requests  a total of  $8,228,300 and  68.5  permanent workyears  for
this program, of which  $6,288,300 is  for  Salaries and Expenses  and  $1,940,000 is
for Research and Development.   This represents an increase of 548,500 in the Salaries
and Expenses appropriation and  a  decrease  of  51,624,100 in the  Research  and Devel-
opment appropriation.  The  decrease  reflects the  completion  of  a number  of  fate
and effect  studies, the completion of  the  development  of  certain test methods,  the
concentration of  validation  activities at laboratories with  optimal  skill  mixes
and the transfer  of the  Exploratory  Research  resources to the  Intermedia program.

     Develoo  and  Validate  Test  Methods  That  Identify   and  Assess Health and
Environmental Hazards of Chemicals Under TSCA.TRe  environmental  hazards  assess-
ment programis designed  to  develop,improve,  and validate  test methods and to
define the bounds of reliability for such tests.   This research effort also provides
effects data from field evaluations of the  test methods  for  development of mathemati-
cal models and for testing and validation  of  physical models.

     These validated  test  methods  are  needed   in  defining  the  hazard  of  toxic
chemicals.  Knowledge gaps  still  exist in developing  single-species  tests  to meet
the specific regulatory needs  of  OTS.   Also,  there is  a need to  evaluate the uses
of single-species tests for multispecies  systems.   Methodologies  will  be developed
to define how much testing is needed for an adequate assessment of potential chemi-
cal hazards.

     Terrestrial toxicology research will  focus  on  the effects  of toxics  chemicals
on both plant and  animal  species.  Test methods  will   be  developed and  validated;
and, more emphasis  on validation  will  be  evident during this  period.   The proposed
critically needed tests will  assist EPA  in  identifying terrestrial  effects  which
should concern  us  and  in  defining   risk to   terrestrial  plants  and   wildlife.

     The comparative toxicology program is designed to define how much  testing is
needed for  an adequate  risk  assessment, when one  species  can be  used to test  and
predict for other species, and  which combination of species  and toxicity tests can
be considered most  predictive.  Efforts in comparative toxicology will lead to-the
identification of the most appropriate test organism and test method for a specific
situation.  Tests  will  be  developed   on  a diverse phyla  of  marine  organisms to
develop comparative toxicological  relationships.
                                         TS-17

-------
     System-level research  is being  conducted to  perform  studies  on  effects  of
toxic chemicals  on ecosystems.  This  research  is  necessary  because estimates based
upon single-species data may not accurately define the hazard to larger ecosystems.
Therefore, this  research  effort   will   evaluate  system-level  .affects  indicating
ecosystem health/stress  from toxic chemicals.

     Humans are  exposed to  toxic chemical, contaminants  not only  through  direct
contact  from the ambient environment, but  also  through consumption  of  plants and
animals which  themselves have become contaminated.  The  indirect  human  exposure
effort focuses on  the  development of methods  for defining  indirect human exposure
with emphasis  on protocols for  plant uptake, fish  and invertebrate  uptake,  food
chain bioaccumulation and transport.

     Laboratory  scale simulated environmental systems (microcosms) are being devel-
oped to  predict  effects of chemicals in freshwater, marine/estuarine and terres-
trial emn'ronnents.  They  will  be used to  validate  effects  processes, to validate
mathematical models a.nd  to screen  the effects of chemicals for implementing Sections
4 and 5 of TSCA.  This will be the first attempt to develop the criteria for deter-
mining limits  of applicability of toxicological  data,  obtained  in the laboratory,
with certain kinds of  aquatic  communities and  the first step in defining a quantita-
tive relationship between the  data obtained  in the  laboratory  with  field situations.
This will provide OTS with  the capability to extrapolate from lab models and methods
to the real environment.

     Develop and Yalidate .Methodsto Predict.and Hgnitor;  Human  and  Environrnental
ExposT/Fe to Chemicals Under TSCA"   This  Fesearcfi  activity  identifies  HfSe  major
transport and  transformation  processes that determine environmental  exposures.  It
involves the development of  data  bases,  validated mathematical  models and associ-
ated methods needed to  estimate environmental  exposures.   OTS needs evaluations of
many aspects of  exposure assessment  to minimize costs  related  to  data collection,
laboratory testing and  mathematical  model  applications.  More accurate models will
reduce the uncertainty  surrounding exposure estimates and reduce the  cost of regu-
latory actions as part of the Section 5 PMN review process and evaluation of speci-
fic chemicals under Section 6,

     Environmental concentration data are critical for estimating exposure of humans
and biota to toxic chemicals  and  for estimating  environmental hazard and risk as a
result of exposure.  Exposure  assessment methodologies  will  be  developed for pre-
dicting the concentration  of  to.xic  chemicals.  The  results  of  this, research will
be a set of models, capable  of  predicting environmental  concentrations  of toxic
chemicals, that  are suitable for a wide range of applications by OTS.

     Research i.n  this  area will  be   involved  in  developing  the  scientific/under-
standing and quantification of how the various transport and  fate processes act on
toxic chemicals.  This  information  is fundamental  to determining  the significance
of the processes and to  developing laboratory  tests  for  measurement and for extra-
polating the measured  rate.s to real   environments, through  the  development and use
of exposure or benefit/risk models.  These coefficients and/or protocols are needed
for Section 4 of TSCA in PMN evaluations.   In 1934 the basic scientific understand-
ings, concepts,  and  data  will be  acquired  to  develop  defensible  protocols  for
predicting environmental exposure  to chemicals.   Mathematical  descriptions  of the
significant fate processes will also be developed.

     Microcosms  provide  a  cost-effective  tool  for  validating  exposure  assessment
models, and for  screening  the  fate  a.nd effects of  chemicals  for implementing Sec-
tions 4  arid  5  of  TSCA.  In  1984,  greater  emphasis will  be given  to  validating
exposure assessment models  in field  situations  and .methodologies  for determining
environmentally relevant rates of  biodegradation,  Field evaluation  and verification
will be  employed to  confirm  laboratory-derived  data,  test  methods  and  models in
situations under  field  conditions,  and  to  verifythe  applicability  of laboratory
methodologies to the real environment.  This work provides support under the Toxics
Integration Program and increases  the scientific basis of regulatory de.cisionmaking.
                                          TS-18

-------
     Perform  Technical  Evaluations and Scientific Assessments and Control Quality
of Agency Risk ^Assessments.Technical studies will  be conducted  for OTS on .environ-
me'nta'lfete, exposure, effects, hazards anmimgntal Hazards of QiemicaljsJJnder TSCA.  Research continues on aquatic toxi-
cology methodologies to select  the most  appropriate .species  and tests;  terrestrial
toxicology  focused  on  the  effects of  toxics  on  both plant  and  animal  species;
comparative toxicology to  determine  the  minimum number  of freshwater test species
needed to  evaluate hazards  of  toxic industrial  chemicals;   system-level  effects
research to perform  studies on effects  of toxic  chemicals on ecosystem processes
and functions;  indirect  human  exposure  research to measure  and predict exposures
that occur  to humans through the consumption of plants and animals that  have  become
contaminated; and  hazard  validation  research  to predict  effects  of  chemicals in
freshwater, marine/estuarihe and terrestrial environments.

     Deve!op an d Va1 idate Methods to Predict and Monjtor  Hurnan  and  Environmental
Exposure to ChelrrTcals UriderJTSCA.  Studies' continueon  Ws"" topic" to  id'entTfy
major transport  and tra hi formation  processes  and  to  develop  mathematical   models
and data  bases  needed to  estimate environmental  exposure.  For example:   a  first
generation exposure analysis model  for metals, an  expanded version  of an exposure
analysis modeling  system  (EXAMS)  and  a  multi-media environmental  screening  model
for orgam'cs will  advance  the  state-of-the-art for assessing  environmental concen-
trations for a  range of  pollutant types.   Similar  studies will  provide  an exposure
assessment model for organic chemicals in estuarine environments.

     PerformTechnical  Evaluations and Scientific Assessments  and ControlQuality
of Agency ^RTsFAssessmenti.   Assistance will Be provided to OTS in the:  crftiear
review of test ruTe documents and  screening  of selected new chemicals under Section 5
prenianufacture notification  consideration;  support  for  validation  of  toxicity
tests; support  for exposure  and   risk assessments; and  assistance  in  preparation
and update of T.SCA testing guidelines.

     Develop ^Structure-Activity^ Fate  and  Effects  Relationships  in  Support'of
Premanuf actiiri ng an J Hew U se Rey_i_ews^  Resources  al 1 ocated to  research on SAR were
increased.  Areas expanded ihT983Tnc 1 ude  development of SAR  models for predictive
atmospheric reactivity; freshwater  fate  and exposure,  including microbial degrada-
tion; effects  in  terrestrial  plants;  and  toxicity and   bioaccumulation in  marine
biota.   SAR work on predicting  toxicity and bioaccumulation in  freshwater ecosystems
will continue at the 19S2 level.
                                           TS-19

-------
1983 ..... Explanation of Changes from Budget Estimate

     The net increase of +S375,OQG results from the following action:

     -Congressional Action.  (+$375,000)  Congress added +$8,525,200 to the Research
and Devel opment  appropri ati on  for  priority activities  at  the discretion  of the
Agency.  This  specific  increase  supports  biodegradaticn  of organic  chemicals to
determine the  effect on  and hazard  to the environment  (+3200,000)  and exposure
validations using microcosms to  verify  the  applicability  of laboratory methodology
to the real environment (+3175,000).

1932 Accomplishments

     In 1.982,  the  Agency  obligated  a  total  of  $12,638,400  for this program,  of
which S5, 956, 800 was  under the  Salaries and Expenses  appropriation  and  $6,681,600
was for  extramural   purposes under  the  Research  and Development  appropriation.

     Develop and Validate Test Methods That Identify and Assess Health and Environ-
mentaT^^2'ar^s~"df~CT-eih^al'5^T]hdeif'T'Sj|X.  TRe  1982  research  activity  under  this
objective consisted  of  five major tfteraes.'  aquatic  toxicology,  terrestrial toxico-
logy, comparative toxicology, system-level  effects  and validated hazard  assessment
using microcosms and field sites.  Highlights of our accomplishments are:

     The aquatic toxicology  research activity  identified,  developed  and validated
several test methods which define the hazards of selected toxic chemicals to fresh-
water, marine  and estuarine  species.  The acute  toxicity  data  base  for  PMN chemi-
cals was .developed and published.

     System-level research  studies  were conducted  on  the effects of  toxic chemi-
cals on ecosystem processes, and  on .species  of  concern to man.   Information on the
impact of  selected  toxic  chemicals  on freshwater organisms  in  a controlled, arti-
ficial stream channel was published.

     Develop and Validate Methods to Predict and Monitor  Human  and  Environmental
Exposure to Chemi cal s^ilhciir^ T5CA.  A  number  of  erivTrbnnientaT "processes ' were : ~e'Tuci-
da'ted to describe  the~ transport,  transformation and ultimate disposition of pollu-
tants in various media.

     'erform Technical Evaluations  and  Scientific Assessments and Control Quality
o f A ge ncy Rl s'k T As s . e fs sme nUT.  WSJor  technical  assistance' was  provide o  to ...... ~OT5  Oy
expert reviews of testing  guidelines,  Section  4 test rule determinations and other
documents.,

     .Develop Structure- Activity ^ Fate and Effectj Re1|tjon5jiiD;S  In Support  of  P.T_e-
              '''                        =                                "'
                                                                                ._
manufactSring 'aW'Hew^Use'Rev^ews^  Highlights ₯F= accomplishments  during  1982 it?"-'
eluded: development of toxicity estimates  based on molecular connectivity and devel-
opment of the  relationship of  bioelectric  activity in fish  to  chemical   structure
of toxicants.

STRATOSPHERI C MOD IF I CAT ION

1 984 Program Request

     The .Agency requests  a total  of $875,100 and  1.8  permanent workyears for this
program, of which 5132,700 is for  Salaries and  Expenses  and  $742,400 is  for Research
and Development.  This request is approximately the same as the resources  allocated
to this work in 1983,

     Assess  Stratospheric  Modification.  The 1984 Stratospheric Modification pro-
gram i nc ruaes tne ro I i owing: continuation of research on the  adaptability  of plants
to enhanced  ul traviolet-3  radiation and  the effects  on various  key  life  forms;
coordination of  Federal  research  in  this  area;  continuation of  support  to the
National Academy of  Sciences  for  updating a comprehensive  assessment of  the  state
of knowledge; and preparation  of the fourth biennial  research report  to the  Congress.
                                          TS-2C

-------
 1983 Program

     In 1983, the  Agency  is  allocating  a  total  of $873,100 and 1,8 permanent work-
years to this program, of  which  $130,700  is  under the Salaries and Expenses appro-
 priation and 3742,400 is for extramural  purposes under the Research and Development
appropriation.

     Assess Stratospheric Modification.   The  1983  Stratospheric  Modification  re-
 sea rcF~pTo~g~ranrTscurrently  focused to:   work  closely  with the  National  Academy
of Sciences  to  assess the state-of-the-art  knowledge  and  research  needs  and  to
provide an updated report in 1984;  prepare  the  third biennial research  report to
the Congress,  which  will  be  delivered  in  February  1983;  continue  to  conduct
 research begun  in   1981  on the  adaptability of  plants to  enhanced  ul traviolet-3
 radiation under field  conditions;  study the effects  of  ultraviolet-8  radiation on
key marine life; and coordinate Federal  research.

198.3 Explanation of Cha/ige from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982, the  Agency  obligated a total  of $907,900" for  this  program,  of which
5142,300 was  under the Salaries and Expenses appropriation  and  $765,600  was  for
extramural  purposes under  the Research and Development appropriation.

     Assess  Stratospheric  Modification.   The  Stratospheric Modification  program
had the following  major  accomplishments in 1982.   The program published a National
Academy of  Science  report entitled  "Causes and  Effects   of  Stratospheric  Ozone
Reduction:   An Update."  This  report is a summary  of state-of-the-art information
on stratospheric modification  and  its  attendant  effects.   The  program  computed
solar ultraviolet  radiation  fluxes  to  earth's  surface  as functions  of  latitude,
season, radiation  wavelength,  natural total  ozone  column and percentage changes in
ozone concentrations'  a  handbook  of tables containing   computations  for  use  in
health, ecological  effects and  assessment studies is scheduled to  be  completed in
1983.

NATIONAL CENTER FOR TOXICOLOGICAL RESEARCH

1984 Program Request

     The Agency is not requesting resources for pass-through funding to the National
Center for Toxicological  Research for 1984.  The Agency is concentrating its research
efforts to directly support the implementation of TSCA.  We will,  however, directly
fund specific projects at  the  Center when it is  the most appropriate  forum to meet
our research needs.

1983 Program

     In 1983, the  Agency  is allocating a total  of S?10,000 to  this  program,  all
of which is under  the  Research and  Development appropriation.  This  funds general
long-term projects  of mutual  interest to both agencies.

1983 Explanation of Changesfrom Budget Estimate

     There  is no change in this program.

1982 Accomplishments

     In 1981,  the  Agency obligated a total  of $1,340,200  for this  program,  all  of
which was for extramural  purposes under  the Research and Development appropriation.
During 1982,  the Agency  provided core funding to  the  Center for  general  long-term
studies of mutual  interest to both  agencies.
                                          TS-21

-------
Abatement and
    Control
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
TOXIC SUBSTANCES

    ABATEMENT & CONTROL
       Toxic Substances Strategies...	•	  TS-23
          Toxics Integration	,	  TS-H7
          Chemical  Testing	,	  TS-29
          Existing  Chemical  Review.	-,	  TS-30
          New Chemical  Review.,	'	  TS-32
                                      TS-22

-------
                                   TOXIC SUBSTANCES

                             Toxic Substances Strategies
                                ACTUAL
                                 1982
                  BUDGET
                  ESTIMATE
                    1983
CURRENT
ESTIMATE
  1983
ESTIMATE  INCREASE +
  1984    DECREASE -
         1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Toxics Integration
 Salaries & Expenses
 Abatement Control &
 Coropliance
Chemical Testing
 Salaries 4 Expenses
 Abatement Control  i
 Coropltance
Existing Chemical
Review
 Salaries & Expenses
 Abatement Control &
 Cotnpl iance
New Chemical Review
 Salaries A Expenses
 Abatement Control 4
 Compliance
Testing & Evaluation
 Salaries & Expenses
 Abatement Control 8
 Compliance
Chemical Control
 Salaries & Expenses
 Abatement Control 4
 Compliance
TSCA Information
 Salaries & Expenses
 Abatement Control «
 Compliance
TOTAL:
 Salaries A Expenses
 Abatement Control &
 Compliance

Toxic Substances
Strategies
        SI,300.9   $1,161.5   $1,161.6     S972.7    -S188.9
        $1,905.0   $2,353.4   $2,353.4   $1,938.1    -S415.3

TOTAL   $3,205.9   $3,515.0   $3,515.0   $2,910.8    -$604.2
        $4,181.8
        56,511.1

TOTAL  $10,692.9
        $5,312.6
        $7,365.0

TOTAL  $12,677.6
        $6,841.5
       $10,779.6

TOTAL  $17,621.1
                       TOTAL
 $3,888.3
 $8,094.5
  $4,202.8
  $8,361.7
                                                    $11,982.8  $12,564.5
 $4,607.3   $4,609.7
 $6,078.8   $6,078.8

$10,686.1  $10,688.5
 $7,472.0   $7,571,6
 $5,869.3   $5,384.7
                   $6,652.1
                  $12,863.7

                  $19,515.8
$314.5
$267.2

$581.7
                 $.2,4


                 $2.4
                $99.6
              -5484.6
                                                    $13,341.3  $12,956.3    -$385.0
                   $4,518.0
                   $3,718.9

TOTAL              $8,336.9
                   $4,494.6
                 !  $3,460.0

TOTAL              $7,954.6
       $17,636.8  $16,926.3  $17,129.2  $17,356.8     $227.6
       $26,560.7  $22,396.0  $22,396.0  $21,763.3    -S632.7
TOTAL  $44,197.5  $39,322.3  $39,525.2  $39,120.1    -S405.1
                                        TS-23

-------
       TOXIC SUBSTANCES



Toxic Substances Strateaies


PERMANENT WORKYEARS
Toxics Integration
Chemical Testing
Existing Chemical
Reyi ew
New Chemical Review
Testing & Evaluation
Chemical Control
TSCA Information
TOTAL PERMANENT WORKYEARS
TOTAL W.ORKYEARS
Toxics Integration
Chemical Testing
Existing Chemical
Review
New Chemical Review
Testing 4 Evaluation
Chemical Control
TSCA Information
TOTAL WORKYEARS
ACTUAL
1982
(DOLLARS
24.5
101.0
113.9
156.0



395.4
36.5
110.9
130.8
178.7



456.9
BUDGET
ESTIMATE
1983
CURRENT
ESTIMATE
1983
ESTIMATE INCREASE +
1984 DECREASE -
1984 VS 1983
IN THOUSANDS)
21.0



174.9
136.7
57.7
390.3
28.5



193.5
152.4
63.0
437.4
20.5
93.9
99.0
183.6



397.0
30.0
103.9
ioa.o
203.7



446.6
16.0 -4.5
93.9
93.0 -6.0
171.1 -12.5



.374.0 -23.0
22.8 -7.2
103.7 -.2
103.0 -6.0
189.5 -14.2



419.0 -27.6
           TS-24

-------
                                 TOXIC SUBSTANCES

                            Toxic Substances Strategies


Budget Request

     The Agency requests a  total  of $39,120,100 and 374.0 permanent  workyears  for
1984, a  decrease  of $405,100 and  23.0 workyears  from  1983.   Of these  resources,
517,356,800 is for  Salaries  a.nd  Expenses  and $21,763,.300 is  slated  for  Abatement,
Control and. Compliance,  an increase  of $227,600  and  a decrease  of S632.700  re-
spectively.  The decrease is possible  because EPA  has  adopted a  "problem-oriented"
focus for  the  Existing Chemical   Review  program rather  than  one that attempts  to
produce a  comprehensive  evaluation of  all  aspects of  a given  chemical,  industry
or other  subject.   In the  New  Chemical  Review program  the  decrease is  pos$ible
because EPA  completed a major  effort culminating  in   several  generic   rules  that
partially exempt  several broad  categories  of low-risk   chemicals  from the  premanu-
facturing notice requirements of the Toxic  Substances Control  Act (TSCA)  Section 5.
In 1984,  EPA  expects  to  receive premanufacture notice exemption petitions  which
are more  narrowly defined.  Also,  in  1984,  the  Toxics  Integration State  Management
Assistance program will be  ended.   The increase in Salaries  and Expenses is due to
higher personnel  casts.

Program Description

     This subactivity comprises the program  elements of Toxics  Integration, Chemi-
cal Testing, Existing  Chemical  Review, Klew Chemical Review.   The Agency's  respon-
sibilities under  TSCA involve review,  testing  and control  of new chemicals,  and
testing, information  collection,  information dissemination,  evaluation  and  regu-
lation of  existing  chemicals.  Further the Agency  is  responsible for the  integra-
tion of toxic chemical related activities.

     Toxics Integration —  The  objective  of  the  Toxics Integration program  1s to
promote acohesive,coordinated  Agency,  Interagency   and  International  approach
to solving  chemical   problems.   In 1984,   this  goal will  continue  to   be  carried
out by.   development  and  use  of a comprehensive  chemical  information   network  to
access multi-Agency and  international  data  bases;  the  use  of expert work groups
to develop  multimedia  Agency  strategies   for   chemicals  and  chemical  classes;
development of Agency-wide  guidance packages on  pollutants  of  concern;  coordina-
tion of special chemical response  activities  requiring input  and action  by  several
programs or Agencies; provision  of technical  .support to the  international  programs
dealing with chemical  activities; and, initiation of various  projects  to  gather and
analyze data on Agency chemical  activities,  to prevent  overlap  and  duplication of
such activities among Agency programs.  By pursuing a  vigorous integration effort,
the Agency will minimize duplication and make sound, consistent  decisions  on  chem-
icals.

   Chemical Testing ~ Chemical testing is the  focal poi.nt  for the  development and
accumulation of test  data  on potentially  toxic  chemicals  referred  to EPA.   Based
on TSCA data gathering provisions,  which are  unique in  both  scope and specificity,
the information collected  will  narrow  the  gap  in  scientific knowledge  about  the
toxicity of chemicals  for  other  regulatory agencies as well  as  for EPA.  The  goal
of the  Chemical Testing  program  is to make  accurate decisions about  the  need  for
additional testing  of high  priority  chemicals.    These  decisions   result in  the
generation of  data  "that  will  allow  EPA   to make  reasoned,   scientific  judgments
leading to  both   regulatory and  nonregulatory  actions in  its  Existing  Chemical
Review program.

    The testing program involves conducting  negotiations with industry  for testing
or developing test  rules, designing  appropriate exemptions,  developing test guide-
lines, and  resolving  reimbursement issues.  The .thrust of Section 4 testing  will
be toward negotiation.  The negotiation procedure focuses the scope  of EPA concerns
                                         TS-25

-------
at an early  stage of  review,  relying heavily  on industry and public interest input
for an acceptable agreement-  We  expect that negotiated agreements will  result  in
data seing  received one  to  three  years  faster than through  the  traditional  regula-
tory process.   In  cases  where negotiation  has  a low chance  for success,  such  as
when a large number of manufacturers are involved, we will  continue  to  use formal
rulemaking procedures.   In   lieu  of  issuing  rigid  generic test  standards,  EPA
revised Hs  policy during  1982  to encourage  flexibility between  industry  and  the
Agency for  the  development  of  cost  effective  and  mutually agreed  upon  testing
methodologies.   These nonregulatory  protocols  allow industry the  necessary flexi-
bility to  develop  cost  effective data   collection  schemes   within  the   context  of
Good Laboratory Practice Standards.

     Existing Chemical Review --  The  goal  of the  Existing Chemical Review  program
is to  reduce unreasonable  risks  to  health  or  the  environment caused by  chemicals
already in  commerce.   EPA  plans  to  focus  narrowly  both  problem evaluation  and
solution design with  a   coordinated  inter-  and intra-agency  approach to  achieve  a
comprehensive risk reduction..  By focusing the  evaluation,   EPA will pinpoint  the
data and  analyses  needed  to decide  the most  practicable  and  economic means  of
addressing the problem.  EPA  will take  maximum advantage  of opportunities to  in-
fluence industry or user groups to  reach negotiated agreements  for risk reduction
so that,  risks  can  be   reduced  in   a more  timely  manner  than  through   more  time-
consuming rulemaking  procedures.   EPA will  quickly  document the  cases  which  require
no action because the risks are  already  being adequately managed.  EPA will  reserve
regulatory controls for  those instances  where conflicting market  forces  and  other
factors make negotiated  control  in-feasible.

     The Existing Chemical   Review program  also  includes information collection  and
risk management  activities  needed  for  TSCA   regulation development and  for  the
implementation of  the program.    Computer  systems  are  maintained to   ensure  the
confidential handling  of  business   information,   the  collection  and  statistical
analysis of  health  and  environmental  monitoring   data,  and  the   development  and
implementation of recordkeeping under TSCA  Sections  8 and  12.  The Chemical Inven-
tory, which  defines   the universe  of  existing chemicals,   includes  over 80,000
submissions on over 55,000  chemicals and requires  maintenance for  both  the  new  and
exisiting chemical  programs.

     Mew Chemical Review — EPA's new chemical  premanufacture review  program,  con-
ducted underSection5~ of  TSCA,  reflects the general  preventive philosophy  of
TSCA,  Its  goal  is  to protect human  health and the environment  from unreasonable
chemical risks   before damage occurs.   Without  imposing undue   regulatory  burden,
EPA will  conduct  a program that  subjects  new  chemicals  of possible  concern to  a
meaningful premanufacture  review  to  ensure  that  risks  from  those  chemicals  in
their intended uses are  adequately characterized and, where  necessary,  controlled.
The program  minimizes  the   reporting  burden on manufacturers of new  chemicals  by
limiting information   requirements in premanufacture  notices  (PMN)  to  that which  is
necessary for  an  adequate  review and  by   exempting  manufactures  of low  concern
chemicals from full PMN requirements. This  is accomplished while protecting  against
risks from new chemicals after they  have entered commerce by monitoring  the  commer-
cial development  of   selected chemicals identified  as  possible hazards.   The  new
chemical follow-up program  is designed to  reduce  possible risks from  recently
commercial 1zed new chemicals  and  to  encourage  data  development  on  those chemicals
later during commercialization.          ;
                                        TS-26

-------
TOXICS INTEGRATION,

1984 Program Request

     The Agency  requests  a total  of  52,910,800 and  16.0  permanent workyears  for
1984, a decrease  of  $604,200  and 4.5  workyears from  1983.   Included  in this  total
is S972.70C  for  Salaries  and  Expenses  and 51,938,100  for Abatement,  Control .and
Compliance, a decrease of $188,900 and $415,300 respectively.  The decrease reflects
cessation of  the  State Toxics  Integration Management  Assistance  program.   Prior
Federal efforts  established a  network for  fostering  communication between  States
concerning the  establishment  and  integration  of individual  State toxic  chemical
programs.  Through this  established network,   States  will  continue to  coordinate
their efforts  towards  establishing effective  and  efficient chemical  control  pro-
grams.

     Major 1984  outputs  from  these resources  will   be  Agency-wide strategies  on
chemicals or  chemical  groups,  that will  present Agency  information  and regulation
development tactics  across  EPA's  seven  major  statutes  for  chemical   control.
Through choices  among alternative information/regulatory  scenarios,  the  Agency
will be  able to  describe  for  industry  and  the public  EPA's  intentions  regard-
ing these  chemicals   from  a multi-media  exposure  perspective.    Three  additional
chemical strategies  will  be initiated  and strategies  for four  chemicals  started
in 1983, will be  completed.  Two  special response work  groups will be supported to
continue giving  unified,  crossmedia  Agency attention  to problems,  such as  risk
assessment of dioxins  In  landfills,  resource  recovery plants, and those  resulting
from PCB fires.   Such  work  groups forestall litigation  and other adverse action by
ensuring integrated  Agency responses  by  all   Regional   offices.   The  definitive
Agency-wide reference  work  for EPA on chemical effects,  exposure,  risks, analytic
methods, and  regulations—the  22  Intermedia  Priority  Pollutant  (IPP)   Guidance
Documents—will be partially updated  and  three new ones  prepared.   Revisions  sent
to Headquarters  as  well  as  Regions ensure  integrated  Agency statements on  such
subjects as the risk  of  contaminants  in  drinking  water  and hazards from air explo-
sions.

     In 1984,  updating the EPA Chemical Activity  Status Report  (EPACASR)  data  on
all of  EPA's chemical activities  will  continue to  provide  a  definitive  Agency
source for avoiding  duplicative  and overlapping  chemical  activities across program
areas, as  well  as  the only  resource  for comprehensive  information   on  chemical
investigations.  Coupled  with the Chemical  and Industry  File, the EPACASR will  per-
mit the Toxics  Integration  program to conduct analyses  to  improve the cost-effec-
tiveness of Agency activities—such as analyses to highlight, for potential control,
high priority targets  in  terms of chemical risk.  Finally,  in 1984 implementation
of the  Extramural  Integration Project  will  begin.    This  effort will  .assure  that
all new  contracts and grants  do  not  repeat   or  overlap  previously  purchased  EPA
studies.

     The Toxics Integration program will continue to  provide  technical  support for
U.S. involvement  with  the  Organization  for Economic Cooperation  and Development
(OECD) Chemicals Group and  the OECD Management Committee.   In this role the Agency
will participate  in  the  development of  consistent  data interpretation guides  for
conducting hazard assessments, improved procedures for acquiring  unpublished infor-
mation on  existing  chemicals  and identifying  chemicals  for which  current  data is
inadequate.  The Agency will continue to  fulfill  TSCA Section 12(b) export notifi-
cation responsibilities,  support  technical   chemical information  sharing activities
and review regulatory  proposals  for  consistency  with  the  Trade  Agreement Act of
1979.

     The 1984 request  provides  for maintenance  of the 1983 level  of service by the
Chemical Substances  Information  Network  (CSIN)  to 100 user  organizations from the
public and private sector.  CSIN provides  a totally  coordinated  network  of online
chemical information systems which satisfies user needs to retrieve and  relate chem-
ical Information  about chemical  substances from  many  independent  and autonomous
remote resources.  A  user  charge  system will  be operational  which will  allow for
partial recovery of operating and maintenance costs.
                                         T.S-27

-------
     State assistance activities  will  be limited to  management and evaluation  of
ongoing grants.

1983 Program

     In 1983 the  Agency is  allocating  a total  of S3,515,000  and 20,5  permanent
workyears for  this program,  of  which $1,161,600 is  for  Salaries  and Expenses  and
32,353,400 is  for extramural purposes  under  the Abatement, Control and  Compliance
appropriation.

     Integration activities will  focus  on  completing  the technical  coordination
of Agency  chemical   control  activities.   This  will  be  done  by four  chemical
strategy development  work  groups  initiated  during  1983  to  coordinate  potential
control actions,  resolve  multi-media issues,  and  allow the  Agency  to  streamline
handling of toxics control  actions.   One similar  work group, begun in  1981,  will
produce a prototype  Agency  strategy  for  six  solvents which  will  give  the  Agency
alternative scenarios by which  to  allocate  regulatory attention to the  most cost-
effective risk   reduction  program.   Two  special  response  activities,  a study  of
lead contamination in  Dallas,  and Dioxins  risks begun  during 1982 will  be  con-
cluded.  Two  additional   responses   will  be   coordinated.    The   19  IPP  packages
are being maintained  and  updated, with  three  new  packages  produced  during  1983.

     The Toxics  Integration  program  will  continue  to  provide  technical  support
for U.S.  involvement in the  OECD Chemicals  Group and  the   Management  Committee,
including participating  in  development  of  state-of-the-art  testing   guidelines,
enforcement of  good  laboratory  practices, guidelines  for  hazard  assessments,  and
principles for  exchange  of  information  regarding  risk of chemicals  among  the  24
countries. The  automated  processing  of TSCA  Section  12(b)  export  notifications
will be implemented in June 1983.

     The CSIN  focus  during  1983  is  on  testing the  user charge system  and  on
enhancing the  system  in response to  th.e  prototype  evaluation.  The evaluation  is
showing a  savings in  user time  and  resources,  and  enabling  more  comprehensive
access to chemical  substances  information.   An  additional 50 users,  many  of  them
private sector  users,  are  projected to  begin  using  the system,   resulting  in  100
total  user organizations by the  end of 1983..

     The State  Management  Assistance program  wi^l  focus  on  information  exchange
and toxics  coordination  assistance.   After  1983 these  activities  should  be  con-
tinued by  other  coordinating  mechanisms.   State   Cooperative  Agreements  awarded
under Section  28  of  TSCA are being completed and evaluated this year; results  will
be transferred as information to other States..

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982, the Agency obligated a  total  of 53,205,900 for  Toxics Integration,  of
which $1,300,900  was  under  the  Salaries and Expenses  appropriation and  $1,905,000
was for extramural purposes under  the Abatement, Control  and Compliance appropri-
ation.  A procedure  to  identify Agency priority pollutants  was developed,  and  13
chemicals were selected for development of Agency strategies.   Two  special  response
workgroups were coordinated.   Nineteen Intermedia Priority  Pollutant (IPP) packages
were developed.  A new data file on chemical  use by industry  was created and merged
with chemical  regulatory  status files to assist i.n evaluating the burden  imposed
on industry by  existing  or anticipated chemical regulations.   Two technical  inte-
gration studies on Heavy Metals  and  Water Quality Criteria were produced  upon  re-
quest from other programs within the  Agency.

     The Toxics  Integration  program  continued  its  involvement   in  international
activities, including preparing  for  the High Level Meeting  of the OECD Chemicals
Group.
                                      TS-28

-------
     The Chemical Substances  Information  Network  (CSIN)  system became  operational
during 1982;  50  user organizations were  brought  into the  system.   A  user-charge
system was  designed  to  be  implemented  in  1983 and extension  of the prototype  CSIN
was initiated.

     The State Management  Assistance  program continued  to  promote integration  of
State toxics  control  programs  through  information exchange  and grants  management.
Twelve State  profile  case  studies were completed to highlight the model  elements
of integrated  State  toxics  management  programs  and previously awarded  grants  were
managed in 1982.

CHEMICAL TESTING

1984 Program Request

     The Agency  requests 312,564,500 and  93.9 permanent  workyears  for  this program
of which 54,202,800  is  for Salaries  and Expenses and  58,361,700  for  Abatement,
Control and Compliance.  This  represents  no  change  for permanent  workyears,  but an
increase of 5314,500  for the  Salary  and Expense appropriation, to cover increases
in personnel  compensation  costs  and  an  increase of  $267,200 for  the  Abatement
Control and Compliance appropriation.   The increase  will  support test data develop-
ment activities for chemicals  of concern identified by  the new and existing chemicals
programs.  The extramural resources will be used  to support test methodology develop-
ment, rules design and analysis,  and economic analysis.'

     In 1984 the Agency  expects to complete five  decisions not to test,  14 negotiated
testing agreements, and 14 proposed rulemakings.  By the  end of calendar year 1983,
the Agency will complete the requirements of the court-ordered schedule  by disposing
of the  final  13  "backlog"  chemicals.   Therefore,  by 1984,  we will have  completed
regulatory requirements for all backlog chemicals  included on  lists one  through six
designated by the Interagency  Testing Committee  (ITC) and all statutory  requirements
for those chemicals  included  on  the  ITC lists  in  1981  and  1982 (7th, 8th, 9th, and
10th Priority Lists).  We also expect to  complete decisions  not to test,  negotiate
testing aareements, or propose test rules on those chemicals  designated  for priority
testing during 1983 tilth and 12th ITC Priority  Lists).   During 1984, 10 additional
chemical designations for priority testing have  been planned from  the 13th and 14th
Priority Lists.  Although the  burden placed  upon  the Chemical  Testing  program  will
accelerate during 1984, the Agency has streamlined its  review  and  management of the
Section 4 testing programr,  and expects -to execute all responsibilities  within the
Statutory and court ordered deadlines.

     EPA expects to review for adequacy 200 test data studies  from final  test rules
or negotiated agreements adopted  during  fiscal year 1982 and 1983,   This will  ensure
the integrity of data developed pursuant to these  testing programs.  Resources  will
also be allocated to identify  studies  and  laboratories  in order to target test data
development inspections under the enforcement inspection  program;  to .provide scien-
tific review and evaluation of inspection  and audit reports; and,  to participate in
inspections and audits, as appropriate.

     1984 also marks  the beginning of testing of new chemicals where  the probable
risk is sufficient to require follow-up, after production  is  initiated, but not sign-
ificant enough to warrant  a Section  5(e)  order,  and testing  on existing chemicals
other than  ITC designations.   From this testing EPA  anticipates that an additional
two proposed test rules'and two negotiated agreements will  be developed.

     In 1984, having finished  the bulk of  test guideline development,  resources will
be reduced.   EPA expects to publish 12  additional  health and environmental effects
test guidelines and  to  commence  development  on  an additional  13 testing methodolo-
gies.  The  annual  review and update  of  previously developed guidelines will  be
conducted to ensure compatibility with state-of-the-art technology  and harmonization
with guidelines developed by the  Organization of  Economic  Cooperation  and Develop-
ment (OECO).   In 1984,  30  guidelines will  be  reviewed  and  appropriately updated.
                                      TS-29

-------
1983 Program

     In 1983 the  Agency  is  allocating S.I!,982,800 and 93.9 oeraianent  workyears  to
this program.  Of this total,  $3,88.8,300  is for Salaries and Expenses and 58,094,500
for Abatement, Control and Compliance.  In 1983,  test rule and negotiated agreement
development is expected to exceed 1982 levels.  The Agency anticipates six decisions
not to test, three final  rules,  five  proposed  rules  and  ten  negotiated agreements.
These include decisions on 13 of the remaining 34  ITC backlog chemicals.   Also during
1983, test data generated as the result of test rule:s or negotiated agreements, will
require review and evaluation.   Personnel resources are being reduced in 1983,  prin-
cipally in the  area  of test guidelines  where  the bulk of the  initial  development
work, including the Good Laboratory Practice  Standards, hss been completed,  efforts
to develop and  refine  ouidelines  will continue and an annual review of guidelines
will be conducted in 1983.

1983 Explanation of Changes  from Budget Estimate

     The net increase of +511,982,800 results from the following actions:

     -Restructuring.   (+511,887,800)  The Congressionally approved restructuring  of
the Toxic Substances program elements transfers  resources from three former program
elements:  Testing  and Evaluation,  Chemical Control,  and  T.SCA  Information  into
three new program  elements:   New  Chemical   Review,  Existing  Chemical   Review and
Chemical Testing.  Eaqh  new program  element reflects a  major  program  area  under
TSCA.  Under the old  structure,  outputs  were not specifically related  to resources
within one  program element  but were  related to  resources  in  all three  program
elements.  The  new  structure  establishes three  independent program elements  that
clearly identify resources with program outputs.  Overall  outputs  will  not change,
however the Location  of  resources  will  change to  permit clearer  justification  of
resources and outputs.  The change to the Salaries and Expenses  appropriation was
+53,793,300 and the  change  to  the Abatement, Control  and  Compliance  appropriation
was +58,094,500.

     -Congressional Action.   (+$95,000)  This  increase  includes  +$95,000  of  the
$10.5 million Salaries and" Expenses  add-on  which supports the  480 additional  per-
manent full-time workyears provided to the Agency.

1982 Accomplishments

     In 1982, the Agency obligated $10,692,900 of which $4,181,800 was  for Salaries
and Expenses and  $6,511,100 for Abatement,  Control  and Compliance.   In  1982, the
Agency made decisions  on  eight of  the remaining 34 chemicals  from the backlog  of
ITC recommended chemical  designations while  simultaneously  executing its  responsi-
bilities under Section 4(e) of the Act to  take  action within 12 months  on  all  new
ITC designated chemicals  added  to  the priority list.  These  actions included  four
negotiated testing agreements,  seven  decisions not to  test,  one proposed test rule
and two advanced  notices  of proposed rulemaking. The  program developed a total  of
96 testing  methodologies  for  environmental effects,  health  effects,  mutagenic
effects, neurotoxic effects  and chemical  fate and established a  firm foundation  of
guidelines to support future testing activities.

EX ISTING CHEMICAL RE VI EV|

1984 Program Request

     The Agency  requests  a  total   of  510,688,500 and 93.0 permanent workyears-  for
this program of which 54,609,700 is for the Salaries and Expenses appropriation and
$6,078,800 is for the Abatement, Control  and Compliance appropriation.   This repre-
sents a decrease of 6.0 permanent workyears,  an Increase of 52,400 for  Salaries and
Expenses, and no  change  for  Abatement,  Control  and  Compliance.   The  decrease  in
workyears reflects efficiencies  gained  by  employing  problem  focused   rather  than
comprehensive risk  identification  and  evaluation  techniques.    The   increase  in
Salaries and Expenses  will  fund  higher  personnel   costs.   The  extramural  program
will support  risk  assessments,  data  evaluation,  and  risk management  activities.
                                       TS-30

-------
     In 1984  EPA  will  receive  substantial  data  from  testing,  under Section 4  of
TSCA, for  evaluation  under   the  risk  identification   component   of  the  Existing
Chemical Review program.   EPA will  determine  if  either more testing is  needed  or
if the  data   received  are sufficient  to assess  the  risks  of the  chemical.   In
addition to  the  increased responsibility  of  evaluating  test  data  generated  from
Section 4  rules  or  negotiated  agreements,  EPA must also continue  its  efforts  to
evaluate Section 8{e)  Substantial  Risk Notices, Section  21  Citizen  Petitions,  and
other test data  that may  trigger  a Section  4(f)  unreasonable risk  determination
leading to control action under Sections 5 or 6.

     The risk  evaluation  function  will  be  operating   at full capacity by  1984.
Decisions not  to  pursue  control will  be made  for  chemicals  identified  as  having
only minor problems.   All risk  assessments and  economic analyses  will  focus  on
clear problems needing  risk  management.   Information  collection  will  consist  of
amendments to  the  Section 8  information collection rules  established during  prior
years and  on  chemical  specific  rules  or negotiated information  collection  agree-
ments.  The Risk Management Program will  be operating at greater efficiency,  devel-
oping Section  6 rules, Negotiated  Control Agreements  and/or Risk  Management  Advi-
sories and Significant New Use  Rules  when needed.   EPA will  also  provide followrup
on potychlorinated biphenyls  (PCB)  rulemaking  activities  consisting  of  r.ulemakings
for exemptions  from  the  PCB  ban and  the permitting  of PCB  disposal  facilities.

     The PCB  rules will  generate numerous requests  for exemptions.  A conservative
estimate is that 50  requests  for exemptions  will  be  made  once the final rule  on
PCB.s is promulgated  in 1983 (10  CFC exemption  requests will  also  be processed).  To
issue permits  to PCB disposal  facilities  in 1984, we  will  review  applications  for
disposal of PCBs  in  concentrations  over 50  ppm  using  mobile and  standard  fixed
destruction equipment  such as  high  efficiency  boilers,  chemical  processes,  and
incinerators.  Regional offices  will  be  responsible for review and approval  of PCB
landfills and unique  design stationary PCB incinerators, PCB disposal  site monitor-
ing and  liaison  work  (e.g.,  public  hearings)   associated  with  PCB -disposal.

1983 Program

     In 1983  the  Agency   is allocating a total  of  $10,686,100 and  99.0 permanent
workyears to this program.  Of this total, 54,607,300  is  for Salaries  and Expenses
and 56,078,800 for Abatement,  Control  and Compliance.   We  estimate three chemicals
will require  in-depth  risk assessments in 1983 to characterize the  scientific  and
technical dimensions  of  the  problems  identified.   These three chemicals will  un-
dergo an economic  options  analysis  that  will  support decisions about how to  reduce
the risk.  EPA will also continue to detail  the risk and potential  economic options
of complex chemical  problems.   EPA  will  finish publishing the  last  of  the "founda-
tion" of  TSCA information  collection  rules,   Section  8(c) Recording   of  Adverse
Reactions rule, and  amend  other Section 8 rules as needed to  support  risk  evalua-
tion.  In  the area  of risk  management, we  will  develop  a .uniform PCB disposal
permitting process and begin  issuing  permits for. standard  destruction  systems  and
mobile incinerators..    Also,   three  risk  control  agreements  and/or advisories  on
how to  reduce  risk will   be published.  This  will  meet the new Existing Chemical
Review program strategy of reducing unreasonable  risks without resorting to formal
control  procedures.  Finally,  EPA  plans  to publish  at  least  four  exemptions  to
Section 6 rules on either chlorofluorocarbons  (CFCsj or PCBs in 1983.

1983 Explanation of.Changes from Budget Estimate

     The net increase of +$10,586,100 results  from the  following actions:

     -Restructuring..,   (+$10,478,200.) The  Congressionally  approved  restructuring  of
the Toxic Substances  program  elements transfers resources from three former program
elements:  Testing and  Evaluation,  Chemical  Control,  and  TSCA   Information  into
three new  program  elements:    New  Chemical  Review, Existing  Chemical   Review  and
Chemical Testing.   Each  new  program  element reflects   a  major program  area  under
TSCA.  Under the old structure,  outputs  were not  specifically related to resources
within one program  element but were  related  to  resources  in all  three  program
                                        TS-31

-------
elements.  The  new  structure establishes  three  independent program  elements  that
clearly identify resources with program outputs.  Overall  outputs  will  not change,
However the location  of  resources  will change  to  permit  clearer  justification  of
resources and outputs.   The  change  to  the Salaries and  Expenses appropriation  was
+54,399,400 and the  change  to the  Abatement, Control  and  Compliance  appropriation
was +56,078,800.

     -Congressional. Action.   (+5207,900)   This  increase  includes +5207,900  of  the
$10.5 million Salaries .and"Expenses  add-on which supports the 480  additional  per-
manent full-time workyears provided to the Agency.

1982 Accomplishments

     In 1982,  the Agency obligated a total of 512,677,600,  of  which 35,312,600  was
for Salaries  and  Expenses and  57,365,000  for Abatement,  Control  and  Compliance.
EPA received and reviewed 45 Section 8(e)  Notices of Substantial  Risk  and evaluated
four Citizen Petitions under Section 21.   Of  these  Citizen Petitions  all  four  were
denied.  Four  in-depth   risk  assessments   on  suspect  chemicals  were performed  in
1982 with potential   risk management/ control  activities  to follow  in  1983.   Formal
Section 6  control  activities in 1982  resulted  in  three proposed  rules  (all  PCB),
two final  rules,  (one Asbestos  and  one PCB) three  exemptions to  the CFC  Aerosol
Ban Rule.  EPA  completed the  supporting documentation  for  a new approach to influ-
ence risk  reduction  without resulting to  formal  control and  bega.n development  of
documents that  will  both outline  chemical  hazards and  provide  advice  on  ways  to
decrease potential   risks.   These  documents  .are designed  to  encourage  preventive
action well before  a decision  to  conduct  formal  rulemaking  is made and  will  be
used in conjunction with the negotiated control  agreement process.

NEW CHEMICAL REVIEW

1984 Program. Request

     The Agency  requests a  total  of 512,956,300 and 171.1 permanent workyears  of
which 57,571,600 is under the Salaries  and expenses appropriation and  55,384,700 is
under the  Abatement  Control  and Compliance  appropriation.  This  represents  a  de-
crease of  12.5  permanent workyears.   An increase of  599,600  for  .Salaries  and  Ex-
penses representing  an increase  in personnel  compensation  costs, and  a  decrease  of
$484,60.0 for  Abatement  Control   and  Compliance.  The  reductions  in  workyears  and
Abatement, Control  and Compliance  reflect a decrease in exemption  rule  development
and new chemical follow-up activities.   This decrease is possible since  the program
will focus on narrower categories  of chemicals, for potential exemption  rules  and
to new chemical  follow-up activities  as  a  result of greater efficiency  in developing
and promulgating Significant  New Use (SNUR)  and information  collection  rules.   The
extramural program  will   support data  analysis,  exposure  model  development  and
evaluation, and literature searching-

     By 1984,  the nature  of  the  New  Chemical  Review program will have changed dra-
matically, because of an increase in the number  of  notices  submitted  on  new chemi-
cals and bec.ause of  the  Section 5{h)(4) exemption  rules scheduled  for promulgation
in 1983.  Current estimates, based  on trend analysis, indicate that EPA  will review
660 Premanufacture Notices  (PMNs)  of  the 1,300 new  chemical  notices  received  in
1984, compared  to  839 PMNs  received  in" 1982.   The  average chemical  received  for
PMN review in 1984 is likely to  be of  higher  risk  and  will,  therefore require more
detailed review than  the typical  PMN chemical received  in  1982  because  exemptions
will eliminate large chemical classes of low,concern.

     With the exemption  rule  for photographic chemicals in place and  assuming that
the Section  5(h)(4)   exemption   rules  for  site-limited  intermediate,  low  volume
chemicals, and polymers  are  in  place by the  end  of 1983, approximately  half of the
1,300 new chemical notices  submitted to EPA  will be abbreviated exemption notices.
In addition to  these exemption   noticeSj  the  Agency also anticipates that  it  will
receive 60 Test Marketing Exemption applications which  are required to  be reviewed
                                      TS-32

-------
within 45-days of receipt.   EPA will respond to at least three separate applications
for additional Section 5(h){4) exemptions from  -the  DMK requirement, and win conduct
audits in  1984  in  support  of existing Section 5(h)<4)  exemption  rules  promulgated
in 1982  and  1.983.   This will  ensure  that the  exemption provisions are  working  to
provide  the level of protection as intended.

   The PUN  review  of  new  chemicals  addresses  an extremely  narrow  segment  of
the risks  that  a  new chemical may  eventually  pose, because  it  can  only  focus  on
the intended methods  of manufacture,  production  volume, and  uses  described  in the
PHN notice.   After  a new  chemical  has  cleared  PMN review,  however,  unrestricted
commercialization, including  significant  increases  in production  volume  and devel-
opment of  new uses,  is  possible  without further review.   In  some  cases,  these new
conditions may  present  significant  risks.  Therefore,  at  least five  new chemicals
will be  the  subject of  formal follow-up  action  in 1984 which will  include either
development of SNURs or Section 8(a) information collection rules.

1983Program

   In 1983 the Agency is allocating a total of $13,341,300 and 183.6  permanent work
years to.this program.  Of  this total, S7,472,-000  is for  Salaries  and Expenses and
$5,869,300 for  Abatement,  Control  and Compliance.   We  estimate  that EPA  will  re-
ceive 1,000 PMN submissions in 1983,  Many of these will .be subject to Section 5(e)
development of  information   action  that will  result in voluntary  action  by indus-
try.  EPA  has  streamlined   the review of  applications  for Test Market  Exemptions
from PMN requirements,  submitted  under Section 5(h)(l)  of  TSCA,  so  that these ap-
plications are  now  reviewed within  the 45-day period required by  the TSCA.  These
and other  procedural  reforms  will  be incorporated  in  final  PMN   rules,  which are
scheduled  for promulgation  in the spring  of 1983.   The  New Chemical  Review program
will review about 2.00 more new chemicals  than were  reviewed  in  1982  with the same
level of  resources.   Approximately  one  half  of these  new chemicals will  qualify
under one  of  the  four exemption  rules once they  are promulgated  during this year,
while the  remaining  chemicals will   be subject to  the  full  prentanufacture  review
requirement.  Approximately 30  chemicals,  referred  from  the PMN  program,  wil]  be
reviewed in 1983 as follow-up candidates for SNUR or Section 8(a)   rules.

198.3 Explanation of Changes jfrgm Budget E.stiniate

     The net increase of +$13,341,300 results from the following actions:

     -Restructuring.  (+513,441,300)  The  Congressional ly  approved  restructuring of
the Toxic  Substances program  elements transfers resources from three former program
elements:  Testing  and   Evaluation,  Chemical   Control,  and  TSCA  Information  into
three new  program  elements:   New Chemical  Review, Existing Chemical   Review and
Chemical  Testing.  ..Each new  program  element  reflects  a  major program  area under
TSCA.  Under the old  structure,  outputs were  not specifically related to resources
within one  program  element but  were related  to  resources  in  all  three program
elements.  The  new • structure .establishes  three  independent  program  elements that
clearly  identify resources  with program  outputs.   Overall  outputs will  not change,
however  the location  of resources will  change to permit  clearer  justification  of
resources  and outputs.   The change  to the  Salaries  and Expenses  appropriation was
+$7,572,000 and the  change to the Abatement,  Control and Compliance appropriation
was +$5,869,300.                          ,

     -Reprogrammings.   (-$100,000)   During the development of the operating plan,
several  reprogramrni rigs  were made to  this  activity  which  are  not  r.eportable tinder
the Congressional reprogramming  limitations.   These changes  resulted in  a net de-
cre.ase of  -$100,000 to  the  Salaries and Expenses appropriation.

1982 Accomplishments

   In 1982, the Agency  obligated a total  of $17,621,100 of which $6,841,500 was for
Salaries and Expenses,  and $10,779,500 for Abatement,  Control and Compliance.  EPA
received 839 valid  PMN  submissions  and  issued two  Section  5(e)  orders  against new
chemicals  of  concern.   These orders  required  the development  of  toxicity  data
                                        TS-33

-------
before manufacture could  begin.   EPA also developed  a  Section 5(e) Consent  Order
for two derivatives of  industrial  cleaning  compounds  and developed a  Section  5(f)
Order to prohibit commercialization of a  cnemical  which  the submitter subsequently
withdrew..   In addition, EPA  negotiated  testing agreements and/or  control  measures'
for 19 chemicals.   Six Premanufacture Notices  were withdrawn  in  response to  EPA
concerns.

     The Agency reduced the  burden  of ?MN requirements  on the  chemical  industry by
developing exemption rules un.der Section 5(h)(4) for broad  categories  of new  chem-
icals manifesting  low  concern.   A final  rule promulgated  on June  4,   1982  will
exempt chemicals used  in  or for  instant  photographic  film articles.   In  response
to a petition  from  the Chemical  Manufacturers  Association  and other  groups,  pro-
posed rules were developed exempting low production volume,  site-limited intermed-
iate chemicals, and certain  polymers  from premanufacture review.   These exemption
rules should become final  in 1983.   About 50 percent  of the new chemicals  seen in
the New Chemical Review  program  to date  would have been  eligible  for  at least one
of these exemptions,  thereby reducing direct reporting costs to industry  for eligi^
ble chemicals by 50 to 90 percent.

     Finally, as a  major initiative the  Agency designed  and  pursued a selective
follow-up  program to  monitor the  commercial  development of potentially hazardous
new chemicals after manufacture  has  begun.   As many as 45  chemicals  referred  from
the PNM program since its inception were  reviewed  in  1982 as candidates  for Signi-
ficant New Use (SMUR)  or Section 8(.a)  rules.
                                       TS-34

-------
Page Intentionally Blank

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
TOXIC SUBSTANCES

    ENFORCEMENT
       Toxic Substances Enforcenent	  TS-36
          Toxic Substances Enforcement,	,	  T5-37
          Toxic Substances Enforcement Grants		,	  TS-39
                                      TS-35

-------
                                   TOXIC  SUBSTANCES

                             "oxic  Substances  Enforcement

                                ACTUAL    BUDGET      CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE -
                                           1983        1983              298-  VJ  1983

                                (DOLLARS  IN THOUSANDS)

PROGRAM
Toxic Suostances
Enforcement
 Salaries & Expenses           $2,942.5   52,425.9    $2,723.2    $3,579.2     $856.0
 Abatement Control  &             $927.1     :S207.0      $207.0      $207.0
 Compl iance
                       TOTAL   $3,869.6   $2,632.9    $2,930.2    $3,786.2     $856.0

Toxic Substances
Enforcement Grants
 Abatement Control  &             $500.0
 Compliance
                       TOTAL     $500.0

TOTAL:
 Salaries & Expenses           $2,942.5   $2,425.9    $2,723.2    $3,579.2     $856.0
 Abatement Control  &           $1,427.1     $207.0      $207.0      $207.0
 Compl iance

Toxic Substances       TOTAL   $4,369.6   $2,632.9    $2,930.2    $3,786.2     $856.0
Enforcement


PERMANENT WORKYEARS
Toxic Substances                   72.7       63.9       78.9       87.1        8.2
Enforcement

TOTAL PERMANENT WORKYEARS          72.7       63.9       78.9       87.1        8.2


TOTAL WORKYEARS
Toxic Substances                   80.6       64.6       79.6       89.0       9.4
Enforcement

TOTAL WORKYEARS                    80.6       64.6       79,6       89.0       9.4
                                       TS-36

-------
                                  TOXIC SUBSTANCES


                            Toxic Substances Enforcement


Budget Request

     The Agency  requests  a total of   53,786,200  and  87.1  permanent workyears  for
1984, an increase of 5356,000 and 8.2  workyears  from  1983.   Included  in  this  total
is 53,579,200  for Salaries  and Expenses,  an  increase  of  3856,000;  and  $207,000
for Abatement, Control  and  Compliance.   The  increase  in  resources  for  this program
will support  activities,  such as sample analysis to  support Toxic  Substances  Con-
trol Act (TSCA) inspections and  emergency responses  involving TSCA  regulated chemi-
cals, that  were  previously  conducted  by  the National  Enforcement  Investigation
Center (NEIC),   Resources are  also  requested  for  increased  import   surveillance
and liaison with the U.S. Customs Service,

P rogram Descri pti on

     This program  supports  all  compliance  monitoring  and  compliance  assistance
activities under the Toxic Substances  Control Act (TSCA), including support to the
regulation development effort and Regional  polychlorinated  biphenyls (PCBs) dispos-
al  permitting, compliance monitoring  and liaison  work.

     Toxic Substances Enforcement --   The Toxic Substances  Enforcement program en-
sures compliancewithTSCArules  and  regulations.    Headquarters  and  Regional
offices-play  distinct  but complementary roles  in the program's operation,   Head-
quarters provides enforcement support  to the TSCA regulatory  development  process;
designs, Implements, and  oversees compliance monitoring activities by  developing
guidances, strategies and procedures;  and,  provides  technical compliance  assistance
and technical support to case development and prosecution activities.

     Regional offices respond to special risk situations;   inspect  facilities  that
manufacture, process, distribute, or  use new or  specifically  regulated  chemicals;
and, monitor laboratories performing  tests  pursuant  to TSCA  testing rules or volun-
tary testing  agreements.   Regional offices  also  assist  the  regulated  community in
complying with all applicable TSCA regulations  and  seek voluntary  remedial action
in lieu  of enforcement prosecution  where  appropriate.  In  cases   where  voluntary
compliance is not achieved,  Regional  personnel-'prepare and issue notices of viola-
tion and administrative  orders.   The  enforcement program assists and  supports the
Office of  Legal  and Enforcement  Counsel  (OLEC)   In  the development  of  civil  and
criminal referrals.  The  Regions are  also  responsible for PCS disposal  site  moni-
toring, and  permitting   of  unique  stationary  incinerators and  PCS  land fills.

TOXIC SUBSTANCES ENFORCEMENT          .   .

1984 Program_Request

     The Agency  requests  a  total of  53,786,200  and  87.1  permanent workyears for
this program, of  which  $3,579,200 Is  fey  the Salaries  and  Expenses  appropriation
and $207,000  for  the Abatement,  Control  and Compliance  appropriation.   This  is an
increase of $856,000.  The  increase  reflects the addition  of  resources  to support
activities previously conducted by  the "NEIC.   These  include  sample  analysis for
TSCA rules, PCB, and dioxin  inspections, support  for  emergency responses involving
TSCA regulated  chemicals,  and  for significant inspections  of  national  importance.
The Increase  will  also  support increased  Import surveillance  of TSCA  regulated
chemicals to  ensure  proper  compliance  with regulations for imports  and  domestic
chemicals.  Contract  support includes  ADP  support  for the Federal   Insecticide,
Fungicide, and  Rodenticide Act  (FIFRA)  and TSCA Enforcement  System  (FATES),  the
computer system used to store and maintain  compliance  data.
                                         TS-37

-------
     Headauarters staff will participate in all  TSCA rulenaking activities and will
develop compliance strategies  for  each new  regulation.  Support for Regional compli-
ance monitoring,  voluntary  compliance  assistance,  and case  development  activities
under Sections 4, 5, 6, 8,  12 and 13 will  be provided.  Headquarters  will  continue
to -manage  the  overall  program  through   appropriate  guidance  and  Regional  review
including on-sight program evaluation.

     In 1984, there will  be  an overall increase incompliance monitoring activities.
Regional offices will conduct inspections of facilities subject to chemical control
reaulations, including  requirements  for PCS marking  and  disposal, the PCB  rules,
the chlorofluorocarbons  [CFC)  rule,  asbestos,   and  other    rules.   The  Regional
offices will conduct good  laboratory  practice  (GLP)  and  test rule  inspections,
inspections to  determine  compliance  with  new   chemical  regulations,  inspections
under TSCA  reporting  reauirements,  imoort  inspections,  and export  inspections.
Regional offices will also  be responsible  for review and  approval  of PCB landfills
and unique  design  stationary PCS  incinerators,  PCB  disposal  site monitoring  and
liaison work  (e.g.,  public  hearings)   associated  with  PCB  disposal.   Under  the
Existing Chemical Program,  the  Office  of  Toxic  Substances  will issue permits  for
all chemical and  biological destruction systems,  all  mobile  incinerators and all
stationary PCB inci.nerators that are not of a unique design.

     The Toxic  Substances  Enforcement program will also prepare  and  issue notices
of violation  and  administrative  orders  wi th  the  concurrence  of  OLEC   and  will
provide technical assistance  and  support to OLEC  in  the  prosecution of  civil  and
criminal cases as warranted.

1983 Program

     In 1983, the  Agency is  allocating  a total of $2,930,ZOO and  73.9  permanent
workyears to this  program  of  which S2,723,200  is for  Salaries  and  Expenses  and
$207,000 is  for  extramural  purposes under the   Abatement,  Control  and  Compliance
appropriation.

     Headquarters will  manage and execute  national  programs to monitor  compliance
with test  rules  and  voluntary  testing   agreements  under  Section  4,  new  chemical
regulations under Section 5,  Section 6  chemical  control  rules, Section 8 reporting
regulations, and  Section  12  export  notice  requirements.   Headquarters  will  also
participate in regulation development directed  by  the Office  of  Toxic  Substances.

     The Regional program will provide  direct assistance  to  firms  seeking to volun-
tarily comply with  TSCA requirements.    Where violations  are detected,  firms  will
be encouraged to  take  specific remedial  actions  to  achieve compliance.   If  com-
pliance is not achieved, Regional  offices  will  prepare and  issue  notices  of viola-
tion and administrative orders,  and will develop and prosecute cases, as  warranted.
Situations involving substantial  threats to  human  health and  the  environment will
be given priority as they are identified.

     The Regional  staff will  conduct inspections to  determine  compliance  with Sec-
tion 4 testing;   Section"5 new chemical  regulations;   Section 6 chemical  control
rules including  PCB  marking  and disposal,  the PCB  rules, the  CFC rule,  the di.oxrn
regulation, and  the  asbestos-in-schools rule;   Section  8  reporting  rules;   and,
Section 12 export notice requirements.

     Regional offices will  also  be  responsible  for PCB  site  disposal  monitoring,
liaison work associated with PCB disposal, and the  review and approval of PCB land-
fills and unique design PCB stationary  incinerators.

1983 Explanation of Changes from Budget  Estimate
                                    f    (
     The net increase of +$297,300 results from  the following actions:

     -Congressional  Action.  (+5284,200)   This  increase  includes  +5284,200  of the
SI0.5 million salaries  arid  Expenses  add-on which  supports  the  480  additional  per-
manent full-time workyears provided to  the Agency.
                                        TS-38

-------
     ReDrporaann'ngs.   (+513,100)   During  the  development of  the  operating  olan,
severTi••eprograiwm'ngs were  made to this activity  which are not  repc'taple  under"
the Congressional   reprogramming limitations.   These  changes   resulted   fn  a  net
increase of +513,100 to the Salaries and Expenses appropriation.

1P8.2  Accoracli shment.s

     In 1982, the  Agency  obligated a total   of  $3,869,500 of which 52,94.2,500 was
for Salaries  .and   Expenses  and  5927,100  for  Abatement,  Control   and  Compliance.
Extramural  funds  provided  compliance   inspection   suoport,  chemical  analysis  of
samples, and  revision and  development  of compliance  strategies.   Compliance  moni-
toring strategies  were  completed  for   Section  5(h)(4)  exemptions,  the   Section  6
asbestos-in-schcol s program, and Section  S'a)  reporting.  Assistance  was provided
to the Office of  Toxic  Substances  in the  development of new regulations, including
good laboratory  practice   rules  for health  effects  testing  and  draft  ecological
effects test guidelines, a chemical control  rule for asbestos-in-schocls, reporting
rules for asbestos and  250 other chemicals, and the  PKN  rules.   Enforcement  staff
developed inspection  target guidance   for  compliance  monitoring   associated  with
Section 5 and  Section 6  (dioxin and CFCK   Headquarters  staff  also  developed and
assisted the  Regional   offices  in  developing  and  prosecuting  enforcement  cases
under Sections 6 and 8(e),

     Regional office,staff responded  to special  risk  incidents,  inspected  PCS and
CFC establishments, conducted  compliance monitoring activities  to  support  Section
5 premanufacture notification review and Section  8(e)  substantial risk notification,
and developed and prosecuted enforcement cases  upon detection of serious violations.
Administrative orders were issued in 101 cases;   276 notices of warning were  issued.

     Both Headquarters and Regional staff  were involved  in the  coordination and
handling.of  several special  risk situations  .such as the PCB contamination of natu^
ral gas pipelines.

TOXICSUSJ5TAHCES ENFORCEMENT GRANTS

1984Program Request

     The Agency requests  no resources  for  this  program in 1984.   The  results and
evaluation of the  operation  of the project in-the  various  States  will  continue to
be raade available  to other States interested in chemical control.

1983 Program

     The Agency is allocating   no  resources  for this  program  in  1983.   The  pilot
program will be evaluated and the information will  be made available to the  States.

1?82 Accomplishments

     In 1982, the  Agency  obligated  a  total  of  $500,000 for this  program,  all  of
which was  for  extramural  purposes  under the  Abatement,  Control  and  Compliance
aopropriation.  The pilot  cooperative  grant program  with California,  Connecticut,
Maryland, Michigan, and Ohio was discontinued.
                                        TS-39

-------
Page Intentionally Blank

-------
Energy
  SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Tabl e of Contents
ENERGY  •                               :                                     E-l

    RESEARCH 8 DEVELOPMENT
       Multi -Media Energy ............................... , . ....... . ..... ...  E-4
       Oxidants Energy.. .. ....... ......... ........................ ........  E-17
       Gases & Particles Energy.... ..... .................................. .  E-20
       Water Quality Energy.,... .......... ..... ...... .... ............. ....  E-24
     •  Industrial  Wastewater Energy ......... . ............... . ......... ....  E-27
       Municipal  .Spills Energy... ...... ...................................  E-30
                                        E-l

-------
                                        ENERGY

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  J-
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE  -
                                           1983       1983             1984 VS  1983
                                (DOLLARS IN THOUSANDS)

APPROPRIATION
 Salaries & Expenses          $10,163.1   $7,019.4   $4,489.7    S3,694.1     -S795.6
 Research & Development       $55,499.8  527,510.8  $20,511.2   S19,836.0     -5675.2

TOTAL, Energy                 $65,.662.9  $34,530.2  $25,000.9   323,530.1   -51,470.8


PERMANENT WORK YEARS               138.9       61.8       36.4        36.8          .4
TOTAL WORKYEARS'                   196.9      100.1       53.5        54.9         1.4
OUTLAYS                       $90,638.0  $55,501.0  $56,424.0   $42,153.0  -$14,271.0
AUTHORIZATION LEVELS
                                        E-2

-------
                                        ENERGY


OVERVIEWAMD STRATEGY


     The overall goal of the Energy research and development program is to  provide
the scientific  information  necessary  to  support the Agency's  permitting  and stan-
dard setting processes and  allow  for  the  development  of energy sources In an envi-
ronment ally acceptable manner.   Research  will  be  conducted  to  better  understand
the phenomena of  acid  deposition;  enhance the Agency's  knowledge  of  the  potential
health and environmental effects  of emerging energy technologies;  characterize and
evaluate synfuels discharges and  expand EPA's  knowledge of tne performance,  relia-
bility and  cost of  the  limestone  injection  multistage burner  (LIMB)  technology,

Acid Rain

     Many questions  still  remain  unanswered  about the  causes,  effects, and methods
of mitigating or controlling  acid deposition.  The  objective of  acid  deposition
research is  to   develop  the necessary  data to  fully   understand  the sources  and
characteristics of acid deposition, the extent  of damages  or potential  damage,  and
the options for mitigating its effects.   This information is needed to develop cost
effective, scientifically  sound,   regulatory  policies.   Because  of  the  potential
national and  International  implications  of the  phenomena,  we  are  requesting  an
increase in resources for our 1984 research pro-gram.

     For program purposes,  acid deposition  research activities can be described by
five generic  categories:    man-made  sources;  atmospheric  processes;  deposition
monitoring; health and  environmental  effects;  and  assessment  and  policy  .analysis.
Research effects  in  the  man-made  sources  are designed  to  improve  and  consolidate
inventories of  current  and projected emissions  of acid  precipitation precursors,
and to  develop   capabilities  to  evaluate the  costs  and   performance  of  control
measures for  all  major  source categories.   Research   efforts in  the  atmospheric
processes area  are designed to  address the physical  understanding  and mathematical
description of  acidic  deposition.   In deposition monitoring,  efforts are designed
to systematically collect  dry  deposition,  rainfall,  meterological and  other data
at specified  sites.   In  the  area  of health  and  environmental effects,  research
projects are being conducted to understand the  impact  of acid  deposition  on  crops,
forests and  soils,  drinking water,  aquatic systems  and materials.   Finally,  the
assessment and  policy  analysis  research  efforts  perform  integrated  assessments
linking all areas of research  under the Federal  Interagency Task  Force  and  assess
the costs and benefits of alternative mitigation strategies,

Synthetic Fuels

     A second major  research activity is  the development and evaluation  of data on
the health and  environmental impacts  of pollutants associated with synthetic fuel
processes;  the  characterization  of discharges,  and  the   assessment of  emission
reduction technology  options   for  mitigating  these impacts.   These  efforts  will
assist industry and  permitting  officials  in  identifying problems  with might impede
the commercialization  of   the  industry   in  an  environmentally acceptable  manner,

LIMB Control Technology

     A third major research area  is the development of the necessary performance,
reliability, and  cost  data to  accelerate the  commercialization  of  innovative  or
cost-effective energy-related pollution  control  technologies.   The thrust  in this
area is the development of the limestone injection multistage burner (LIMB)  emis-
sion reduction  technology.  The LIMB is  a  technology  which  combines SOg  control
with simultaneous NQX control  by  mixing  coal and-limestone together,  pulvering the
mixture and combusting the mixture in a low NOX burner.  This technology can poten-
tially lower the  capital  cost  of  SOX control  by a factor of 3  to  4 and  annual
operating costs by 50 percent.
                                         £-3

-------
Page Intentionally Blank

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                                        ENERGY

                                  Multi-Media Energy

                                ACTUAL   BUDGET
                                 1982    ESTIMATE
                                           1983
                                                    CURRENT   ESTIMATE   INCREASE  +
                                                    ESTIMATE    1S64     DECREASE  -
                                                      1983             1984 VS 1983
                                (DOLLARS IN THOUSANDS)
PROGRAP.
Acid Rain
 Salaries & Expenses
 Research & Development
                       TOTAL
  $201.0
58,992. 1
$9,193.1
   S483.1
$11,546.0
$12,0,29,1
           $483.1
        $12,046.0
        $12,529.1
                                                                  S492.4      S9.3
                                                               S13, 546.0  $1,500.0
                                                               $14,038,4  $1,509.3
Technical Information &
Liaison
 Salaries & Expenses
 Research & Development
                       TOTAL
Health Effects
 Salaries & Expenses
 Research & Development
                       TOTAL
Environmental Engineering &
Technology
 Salaries i Expenses           $3,577.0
 Research £ Development        $9,243.9
                       TOTAL  $12,820.9
$155.6
$24.1
$179,7
$53.2
$2,591.3
$2,644.5
$32.1

$32.1
$633.4
$1,755.5
$2,388.9



$633.4
$1,755.5
$2,388.9



$662.1
$1,704.7
$2,366.8



S28.7
-550. 8
-S22.1
Environmental Processes
& Effects
 Salaries & Expenses '
 Research 8 Development
                       TOTAL
                                 $506.2
                               $6,005.1
                               $6,511.3
                                          $3,373.2   $3,373,2   $2,539.6   -$833.6
                                          $6,259.7   $6,259.7   $4,585.3 -$1,674.4
                                          $9,632.9   $9,532.9   $7,124.9 -$2,508.0
$450.0     $450.0              -S450.0
$450.0     $450.0              -$450.0
TOTAL:
 Salaries & Expenses
 Research & Development
                               $4,493.0   $4,521.8   $4,489.7   $3,694.1   -$795.6
                              $26,856.5  $20,011.2  $20,511.2  $19,336.0   -S675.2
Multi-Media Energy     TOTAL  $31,349.5  524,533.0  $25,000.9  $23,530.1 -$1,470,8
PERMANENT WORKYEARS
Acid Rain

Technical Information
Liaison
                                    4.2

                                    3.9
   7.0
                 7.0
                                      7.0
                                        E-4

-------
                                        ENERGY
                                  Multi-Media Energy
                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1932    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 V.S 1983
Health Effects
Environmental  Engineering
& Technology
Environmental  Processes
& Effects
TOTAL PERMANENT WORKYEARS
(DOLLARS IN THOUSANDS)
               3,1        3.1
   56.8       26.7       26.3
    3.1
   68.0
36.8
36.4
                       3.1
                      26.7
36.8
                       .4
TOTAL WORK YEARS
Acid Rain
Technical Information
&  Liaison
Health Effects
Environmental Engineering
& Technology
Environmental Processes
« Effects
TOTAL WORKYEARS
4.4
4.3
.2
58 .0
5.5
82.4
8.0

9.2
37.7

54.9
8.0

9.2
36.3

53.5
8.0

9.2
37.7

.54.9
                                               1.4
                                               1.4
                                         E-5

-------
                                          .ENERGY
                                     Multi-Media Energy
Major Outputs/Mi 1estones

Develop Understanding of Acid Rain
Needed for Assessments and
Policy Analysis.

     Estimate Emissions from Man-
     Made Sources.

     -  Report presenting the
        historic data base
        (S02, NOX)

     -  Report on data analysis
        technique  to determine
        relative source
        contributions

     -  Prototype  industrial combustion
        emissions  model

     -  AUSM national model  design report  .

     Understand Atmospheric  Processes.

     -  Transport, chemistry and precip-
        itation modules for  nonlinear model

     Establish Deposition Monitoring Data Bases.

     -  Better development of intensive dry
        deposition monitor

     -  Procedures for determining accuracy
        and precision of acid precipitation
        measurements

     Understand and Quantify Aquatic Effects,

     -  Regional Sensitivity Geocheinical  Model

     Understand and Quantify Terrestrial
     Effects.

   ,  -  Report describing application of  dendro-
        chronologicai methods in determination
        of long-term changes in forest tree  growth
        associated with chronic exposure  to  acid
        deposition and co-occurring gaseous  pollu-
        tants
 Actual
  1982
Current
Estimate  Estimate
  1983      1984
 4/84




 6/84




11/83




 6/84




 9/84


 9/84




12/84
 4/84




 6/84


 5/85

11/83




 6/84




 9/84


 9/84
 4/84




 6/84


 5/85

11/83




 6/84




 9/84


 9/84
12/84    12/84
10/84
10/84    10/84
                                          E-6

-------
                                         ENERGY
                                   Multi-Media Energy
                                                     Actual
Major Outputs/Milestones                              1982
     -  Interim report on the effects of
        acid deposition and mobilization
        on critical processes in terres-
        trial vegetation leading.to changes
        in growth, yield or reproduction as
        a function of acid depositio.fi dose             9/84
     Understand and Quantify Effects on
     Materials and Cultural  Resources.
     -  Final report of BOM-EPA study detail-
        ing effects of exposure to various
        environments                                  10/84
     -  Finalization of Materials  Inventory
        Coefficients matrix for North America          8/84
     Integrate Research Assessments and Provide
     Information for Policy Analysis.
     -  Critical  Assessment Document
        Public Review Draft                            3/83
        Final Draft                                    9/83
     -  Report on state of knowledge of effects
        of acid rain on tree growth and soils,
        with uncertainty factors
     -  Report on effects assessment methodologies/
        framework for all effects  areas                9/84
Develop and Evaluate LIMB/low-NOx  Control
Technology.
     -  Detailed design analysis of LIM8/Low-NOx
        facilities.
Develop Health and Environmental Risk Analysis
     -  Provide an upgraded health and environmental
        risk analyses for coal gasification, direct
        and indirect coal liquefaction, and oil shale
        technologies.                      '            9/85
     -  Assessment of exposure and effects relation-
        ship for major synfuel pollutants.             9/85
Characterize and Evaluate Synfuels.
     -  Prepare integrated monitoring reference
        manual for Synthetic Fuel  Corporation
        applicants.                                    6/83
Current
Estimate   Estimate
  1983       1984
   9/84      9/84
  10/84     10/84

   8/84      8/84
   3/83
   9/83
   9/84

   9/84
 10/83

' 9/84

  9/84


  6/86
   9/85

   9/85


   6/83
  9/85

  9/85
                                           E-7

-------
                                         ENERGY


                                    Multi-Media Energy
 Budget Request
     The  Agency  requests a total  of  S23,530>1QQ and 36.8  permanent  work/ears for
 1984, a  decrease of  $1,470,800  from 1983.   Included  in  this  total  is $3,694,100
 for  Salaries  and  Expenses  and  $19,836,000  for  Research  and Development,  with  a
 decrease  of  5795,600  and  $675,200   respectively.   This  decrease  occurs  in the
 environmental  engineering  and technology  program element.   In  addition,  the de-
 crease reflects  the transfer  of $1,389,000 in  exploratory research funds  to the
 Intermedia program.

 Program Description

     The  Multi-Media  Energy  program  addresses those problems  originating  from en-
 ergy sources  which have the potential  to  adversely .affect  the  environment  in one
 or more  media.   The  primary  goal  of  this  program is  to  provide  the scientific
 information necessary  to permit the  development and utilization  of  this  nation's
 natural  resources  in~.an environmentally acceptable manner.  The Multi-Media Energy
 research  program has  four major  objectives which  support this goal.

     Objective 1.  Develop the Understanding of  Acid Rain  Needed  forAssessments
 andJ)oYicjy_ Anajyjijs.   rhe i'rft'egra'teSNational ACKF Free imitation AsseTsment^rbgram
 TNAPAPT,  created "by the Acid  Precipitation Act  of 1980 (Title VII of P.L. 96-294),
 was  initiated  to  increase  the  understanding  of  the  causes and  effects of  acid
 deposition so  that  reliable   information  can  be  provided  to  policy-makers, and
 timely, cost-effective  decisions formulated.   Acid  deposition  research activities
 at the Environmental Protection  Agency  (EPA) support this  program,

     Objective 2.  Develop and Evaluate the  limestone  Injection Multistage Burner
 (yMB)/l.owJlp'x Control Technology.  This  objective provides for  the  evaluation of
 a n ef f₯c; t i ve	and in ex pensive" em is s i o n control  technology for pulverized  coal boilers
 that will simultaneously remove  sulfur  oxides (SOX) and nitrogen oxides (NOX) from
 boiler flue  gases.   This  technology is  based  on the  use of  low-NO* combustion
 techniques in  combination with  dry   sorbent  injection  into the  combustion   zone.

     Objective 3.  Develop Health and Environmental Risk Analyses in Support ofEn-
 vironmental  Impact ^Statements ^ and  Permitting   Activities.  ' Researcn uider this
 objective provides  integrated  risk analyses for  priority synfuel  industries so that
 the health and environmental risks of synfuels can be .determined  and the benefits of
 pollution control  assessed.  The results  of this research  are used by  the Regional
 Offices of EPA,  and State and local  governments  in regulatory planning,  focusing
 on Environmental Impact  Statements (EIS) and permitting activities.

     Objective 4.  Characteri ze  and Eva! uate Synfuel s Oisc.hargej and  Control Tecn-
 nologTes ; in  Support   of  Environmental   Impact  Statements _TETS1  "a'n'd Permitting
Activities.  Fiie  research  results of  source  characterization  studies  and control
 technology evaluations  provide  the  means' to  give  States  and  local  authorities
 support in  their  review of  EISs,  permit  applications and monitoring  plans for
 proposed  coal-based and  oil shale synfuel  facilities.

 ACID RAIN

 1984 Program Request

     The  Agency requests a total  of $14,038,400  and 7,0  permanent workyears for this
 program,  of which  $492,400 is  for  Salaries and  Expenses and $13,546,000 is for Re-
 search and Development,  this reflects an increase of .$9,300  and  51,500,000, respec-
                                          E-E

-------
tively, which supports increased efforts in the areas of:   (,1) deposition monitoring;
(2) understanding atTosDheric processes involving s comprehensive field experiment;
(3) estimating  and  modeling  aquatic  effects in  watersheds;  and  (4)  developing
and applying  integrated  assessment  techniques   for  benefits  analysis  utilizing
data from all parts of the program.

     Develop the Understanding of Acid Rain Needed for Assessments and Policy Anal-
ysis.Acid deposition research activities in support  0?  this  objective  can  5e
described by sever, categories outlined below:

     1.  Estimate Emissions from Man-Made Sources:   Research  projects  will  respond
to the  following  questions:  (1)  What  quantities and in  what  Locations  are acidic
substances and their  precursors  being  emitted?  (2)   How  .T.ay  each major  source  or
source category  respond  to different  governmental  policy  options?  and  (3)   What
might be  the  levels  of  future   emissions   from major  sources?  Development  and
maintenance of  detailed   emissions  inventories  focusing  principally  on  SOX  and
NOXj  and  expanding  into  volatile organic  compounds (VOC's)  and carbon  monoxide
(CO)  will  oe  conducted  to support  planned  development  of  complex  regional  acid
deposition models.  Testing of the Advanced Utility Simulation Model  for a range of
policy applications will  be  completed,, with  refinement of the .model  as  aecessary.
Analytically advanced and efficient models for both industrial combustion emissions
and industrial  process emissions  will  be  developed to project SOX>  NOX,  and other
emissions from major industrial  sectors over  the next 10  to 20 years as  a function
of several economic, energy and environmental factors.

     2.  Understand Atmospheric Processes:   Research  in  this  area  responds  to such
questions as:  "What sources are  most responsible for deposition in areas sensitive
to acidification? and  "Under what circumstances and in  what  proportions  do local
and remote sources contribute to  acid deposition?"  To help answer these questions,
our research will  be  designed to  improve  our capability to examine and predict the
movement of air masses.   The  results  of the Cross Appalachian Tracer Experiment will
be examined and  new  instruments  for  measuring inter-layer atmospheric transport in
clouds will  be field tested.   A. comprehensive field study using chemical  tracers in
emissions, recently .developed gas  measuring   instruments,  and  extensive  monitoring
will  be  undertaken  to  study empirically  the movement and transformation  of acids
and precursors from sources to receptors.   To further understand what substances in
the atmosphere determine  the  rate  of formation  of  acid  substances,  laboratory and
field studies to  investigate  the  complex  chemical  changes and  physical  scavenging
that occur in the  atmosphere,  particularly  in clouds, will be  conducted.   Modules
to characterize the chemistry and wet scavenging  will be developed for the advanced
acid deposition regional  model.

     3.  Establish Deposition Monitoring Data  Base:   In  performing  these  moni-
toring activities EPA  will respond  to  such  questions  as:   (1)  How much  acid .and
other substances are  being deposited in  various regions  of  North America?  (2)  Is
acid rain getting worse or better? (3)  What are the spatial and temporal  variations
in deposition? and (4)  What is the  relative importance  of wet and dry deposition?
Our efforts to establish  an  operational  network  to measure dry  deposition  will  be
increased significantly.    At least one  technique will be  ready  for  testing in the
field to  determine  its  adequacy  and operability as  a  sensitive  monitoring  tool.
EPA will  continue  to  provide  quality  assurance  and  to  serve  as a  repository  for
the data  from  deposition  monitoring  networks  in the United States.   Efforts  will
also  continue to develop more reliable, accurate and precise  methods for measuring
the chemical  composition of acid  precipitation,

     4.  Understand and Quantify Aquatic  Effects:   The  aquatic effects program re-
sponds to such questions as:   (1)  At what time  (e.g., 5 years, 20 years, 2.5 years,
etc.)  if  ever,  will  irreversible  damage  occur  in  aquatic ecosystems?   (2)   What
specifically causes  damage?    (3)    Under  what  circumstances   can  mitigation  at
the receptor (e.g., liming) be used? and  (4)   What are  the magnitude and extent of
the effects of acid  deposition occurring  today and in the future? For  instance,  a
research project  that develops  methods   to  determine  trends  in  acidity  and  the
                                          £-9

-------
sensitivity of bodies of water responds to the first question cited above.  Estima-
ting the effects of acid precipitation on  interactions between runoff and  soil water
helps answer both the second and fourth questions.  Other studies responding to the
above questions  include  an evaluation  of specific  mitigation  procedures  such  as
watershed liming  and  studies to  understand  the  effects  of acid  precipitation  on
fish populations and other biota.

     5.  Understand and  Quantify Terrestrial  Effects:   This program will  seek  to
answer questions  similar  to  those  of the aquatic  effects  program.   To  help under-
stand the magnitude  and extent  of  acid  deposition effects  occurring today and  in
the future, a  wide  variety of field  and  laboratory  studies attempting  to estimate
and predict  the  effects  of  acid precipitation  on forests, rangelands,  wetlands,
wildlife and  crops  will  be conducted.   The  effects  of  soil   infiltration,  soil
chemistry, weathering,  metal  transport,  exchange  ana  depletion  of   nutrients,
and soil sensitivity  will  be  addressed.   Similarly, further research is  needed  to
understand the factors which cause damages.

     6.  Understand and Quantify  the Effects  on  Materials  and  Cultural  Resources:
To respond to such questions as:  "At what time, if ever, will  irreversible damages
occur to materials?"  and  "What  specifically  causes damages?"  the  effects  of acid
deposition on construction materials  such as metals, masonry and  some  stone types
will be  studied  in  both field and laboratory  observation  programs.   By  developing
an assay of materials at  risk,  the  research  program will  have  a better  understand-
ing of  the magnitude  and  extent of  acid  deposition  effects occurring today and  in
the future.  Through  the  development of retrospective air  quality  models and eco-
nomic models  in  this  area, the  research  will  respond  to   such  questions  as those
cited above.

     7.  Integrate Research Assessment and Provide Information for Policy Analysis:
This program responds to questions that cut  across  several  research objectives and
relate to the decision-making needs  of policy  makers.   In  1984, the following pro-
jects will  be  supported:   (1) development of advanced methods  for performing inte-
grated assessment functions;  (2) application  of  systems analysis to all acid dep-
osition phenomena in order to characterize mass flows of all important constituents
from point of release to final sink;  (3) assessment of possible NOX control strat-
egies relative to  possible  S02  control  strategies; (4)  assessment  of  primary sul-
fate emissions relative to  sulfate  formation in the atmosphere in affecting poten-
tially sensitive areas;   (5) an analysis of the effectiveness and costs  of control-
ling damage at the receptor sites versus  control  of emissions at source  sites; and
(6) application  of  integrated assessment methods  for  optimal  mitigation solutions
which combine a selection of strategies and technologies.

1983 Program

     In 1983, the Agency is allocating a total of $12,529,100 and 7.0 permanent work-
years to this program, of  which  $483,100 is under  the Salaries and Expense appropri-
ation and 512,046,000 is for extramural purposes  under the Research and  Development
appropriation.

     Develop the Understanding of Acid Rain Needed for Assessments and Policy Anal-
sis. 1.  Estimate  Emissionsfrom Man-MadeSources:Inventorielof the man-made
emissions of acid  rain  precursors  such  a.S SOX  and  NOv  and  oxidant precursors such
as hydrocarbons  are  being analyzed  and  improved  by EPA.   In addition,  models are
being constructed  for  electric  utilities  and other  important  industrial   sectors,
and will provide  comprehensive  costs and emission  changes  for  alternative control
strategies.

     2.  Understand Atmospheric Processes:   intensive research  is  being  conducted
at EPA to improve  our capability  to  examine  and predict the movement of air masses
and pollutants through the use of  tracer  experiments and computer modeling.  Labora-
tory and field studies  are  being  conducted  to investigate  the  complex chemical and
physical changes that occur  in  the  atmosphere (particularly within clouds) and the
role of oxidants  in  acid formation.  EPA is evaluating several operational  trajectory
                                         E-10

-------
models and  conparing their  performance with  monitoring  data.   This evaluation will
determine which model Is) will  be maintained  for use by policy makers.  An Advanced
Acid Deposition Eulerian model  framework  is  being  formulated  to  serve  as the main
integrating mechanism for the atmospheric .processes program.

     3.  Establish Deposition Monitoring Data  Base:   Monitoring  networks are being
expanded, standardized and integrated, into a  well designed National Trends Network.
EPA .has  the role  of providing  quality  assurance  and  serving as  a  respository  of
data from which long-term trends will be documented  and studied.  Efforts are under-
way at EPA  to develop  methods  to  measure dry deposition  accurately.   Once proved
acceptable, these techniques will  be  incorporated into  the national  Trends Network
so that  the amount and  composition of  dry  deposition  can be  measured reliably,

     4.  Understand and Quantify Aquatic  Effects:  Research is  being conducted on
lake.s,  streams  and wetlands  to determine the factors  controlling  acidification.
The impacts on  foodchains and  organisms  ranging  from  fish to  microscopic plants
are being investigated.   Seven  agencies  are  conducting research  in  this area with
EPA having  the lead role.   Surveys are  being  made of water.resources,  soils, geology
and other  factors to  improve  our  knowledge  of  what areas  and  resources  may  be
vulnerable  to  damage.   The  number of lakes,  streams,  and groundwaters  that are
susceptible to  acidification  is being documented  and the  problems  and techniques
associated  with mitigating the effects are being  investigated.

     5.  Understand  and Quantify  Terrestrial  .Effects:   The  potential   impacts  of
acid deposition  on forests,  rangela.nds,  :wetlands, wildlife,  crops  .and  soils are
being studied.   Emphasis  is  being placed  on developing  methods to  estimate the
historical  growth  patterns  in  forests and  to  identify the  significant parameters
(e.g., precipitation,  pH,  plant age,  climate) affecting  growth.  Ttie   interactive
effects  of  fertilizer,  gaseous  pollutants, climate, pests and  drought on crops are
being examined.

     6.  Understand and Quantify the  Effects  on  Materials and Cultural Resources:
The effects of  acid deposition  on materials  such  as building  stone,  metals, and
paints are  being   examined.   Techniques   to  differentiate  the  effects  of  various
pollutants  are being developed,  and the  cost  of  damage  to man-made  structures and
cultural  resources is being estimated.

     7.  Integrate  Research  Assessments  and  Provide  Information  for Policy Anal-
ysis:  An in-depth  Critical  Assessment Document of existing scientific  information
is being  completed,  and  annual  reports  prepared by  the  Task  Force will  be used
to continually  update   that  information  and  describe  the current  implications.
Analyses are  being made of  the  effectiveness,  costs and feasibility  of controlling
emissions of  acidic components,  precursors  and oxidants.   New  technologies  and
diverse  strategies  to  control  emissions  are being examined and  optimal  solutions
combining various technologies and strategies  are being explored.  EPA is develop-
ing an improved  methodology for integrated  assessment  of all aspects  of the acid
deposition  phenomenon.   This  will  allow  cost/benefit  comparisons  of   alternative
mitigation measures.

J98_3 Explanation of Changes from Budget Estimate

     The net increase of +$500,000 results from the foil owing action:

     -Congressional Action.  ( + 5500,000)   Congress  added  a   general   increase  of
•t-$8,52"6,2UO to the  Research and Development appropriation  for priority activities
at the discretion  of the Agency.   This  specific  increase supports   acid  rain re-
search which  was  targeted  as  a  high priority  action  by  Congress in  the Conference
Report in our 1983 Appropriation's Bill.
                                          E-ll

-------
1982 Accomplishments

     In 1982, the Agency obligated a total of 59,193,100 for this program, of which
5201,000 was  under  the Salaries  and  Exoense appropriation and 38,992,100  was  for
extramural purposes under the Research and Development appropriation.

     Develop the Understanding of Acid Rain Needed for Assessments and Policy Anal-
ysis.'T".   Estimate  EmTsTToiTS From  Man-MadeSources':   Ac c on p 1T s hm e .Hts5iv8el"u"-₯!vi"s
objective included  establishment  of  a   technical  panel,  plans   for  an  Advanced
Utilities Simulation Model,  an  operational  state level  version of the model  and a
complete plan  for an  emissions   inventory  as  well  as  an inventory  of emissions
from utilities.

     2.  Understand Atmospheric Processes:   A project to develop a plan to produce
an advanced  acid  deposition  no.del  was begun, requiring  assessment of  the  state of
the a-rt and  identification of key parameters.  Analysis of studies of Oxidation and
Scavenging Characteristics of April Rains provided evidence of the critical role of
oxidants in wet scavenging.

     3.  Establish Deposition Monitoring Data Bases:   Efforts were concentrated in
three areas:  (1) determining the accuracy and  precision  of  procedures  at existing
deposition monitoring  sites;   (2)  developing  an integrated data base {merging data
from existing  systems);   and (3) comparing  existing  techniques  for  estimating dry
deposition.

     4.  Understand and Quantify  Aquatic Effects:   Efforts in  1982  concentrated on
synoptic surveys, the  development of historical  data  as  well  as the  acquisition of
data to  be  used  in model  development and mapping efforts.  Efforts  to  develop an
understanding of  the   effects  of  acid  deposition  on  aquatic  biota  were  beg.un.

     5.  Understand and Quantify  Terrestrial Effects:   Studies were initiated to
inventory forest stands and species while selecting sites for a multi-year monitor-
ing program aimed at estimating the long-term effects of acid deposition on natural
terrestrial  ecosystems.   In  addition,  studies   were  initiated  to determine  which
stage in the forest .life cycle was most sensitive and to  quantify the relationships.
Agricultural studies  included  development of  a prototype  site and  initiation of
studies examining  the problems  associated  with extrapolation  of  laboratory  and
greenhouse data to field situations.

     6,  Understand and Quantify  Effects  on Materials  and Cultural Resources: Agency
efforts concentrated  on  expanding  the  field   studies  of materials  deterioration
conducted with the Bureau  of Mines,  and  on developing  the technology  of  the static
monitors for measuring gaseous deposition.  Contractors were also selected.to being
the development  of  a   materials  inventory and  to  estimate the past  air pollution
levels at selected  materials exposure  sites.   A report  detailing methodology  for
determining the rate of degradation by monitoring tombstones was received.

     7.  Integrate Research Assessments and Provide Information for Policy Analysis:
Studies were  begun  to develop models  for estimating  the  relative  significance of
anthropogenic versus  man-made,  and local  versus distant emissions as well  as the
cost/benefit of control techniques.  In addition, drafts of the Critical  Assessment
Document (an  authoritative  evaluation  of  the  published  literature  relative  to
Acidic Deposition) were prepared.         :

TECHNICAL. INFORMATION  AND LIAISON

1982 Accomp1ishments

     In 1982, the Agency  obligated  a total of .5179,700  for  this  program,  of which
$155,600 was under the Salaries  and Expenses appropriation and  524,100  was for ex-
tramural  purposes under  the  Research  and Development  appropriation.   This activi-
ty, which supports  research  programs  across  all "media,  was consolidated  into the
Intermedia program in 1983.   Thus,  the jrograni Desc ripti on,  1984 Program Reg u e s t,
1983 Program, and 1982 Accompl ishments'narrative 'sections appear there!
                                          E-12

-------
HEALTH EFFECTS

1984 P rogram Request

     The Agency requests a total of 32,366,800 and 3.1 permanent workyears for this
program, of which  5662,100  is  for  Salaries and Expenses  and  51,704,700  is  for Re-
search and Development,  This reflects an increase of $28,700  in Salaries and Expen-
ses and  a  decrease  of $50,800  for  Research  and  Development.   The  net reduction
reflects completion .of  research  on  the comparative  carcinogem'city of various- syn-
fuel chemicals.

     Develop Health and Environmental Risk Analyses in Support of  £Ig  and Permit-
ting Activities.   Tie integrated health ana environmental risk analysis program for
synfuel  industries provides a framework through which scientifically documented risk
can be utilized  in making  regulatory and enforcement decisions  and for determining
the degree to  which  pollution  abatement processes and  devices  are required.  Risk
analysis methodologies for evaluating population  level  impacts of synfuel pollutants
on health and  the  environment are developed through the  integration of exposure and
effects assessments.

     During 1984,  the research  will  focus on upgrading and evaluating the documenta-
tion of the health and environmental effects of critical  classes  of synfuel pollu-
tants.  This includes  upgrading  the  risk analysis methodologies developed in 19.82.
Specific areas  to  be  addressed  are:   (1) the  refinement and  application of models
for evaluating  exposure pathways  in  atmospheric,  terrestrial  and  aquatic media;
(2) the evaluation of  synfuel  pollutant  uptake by  key organisms in the human food-
chain; and (3)  the evaluation  of human  exposure  and  effects data  on  synfuel  pol-
lutants to develop dose/response functions  for cancer  and reproductive risk analy-
ses.

1983 Program

     In 1983,  the Agency is allocating a  total  of $2,388,900  and 3.1 permanent work-
years to this  program,  of  which  $633,400  is under the  Salaries and Expenses appro-
priation and 31,755,500 is  for  extramural  purposes  under the Research and Develop-
ment appropriation.

     Develop Health and Envjronn'ental Risk Analyses in Support of  EIS  and Permit-
ting Activities']   The initial  risk assessment data generated in 1982	is be'ing peer
reviewed, updated  and,  where necessary,  completed.   Chemical compounds associated
with synfuel  technologies have been categorized and grouped into about 40 categories
of chemical classes  called  Risk Analysis  .Units  (RAUs).  Data are  being generated
and evaluated  in  an  effort to  estimate  the  total  exposure  of  humans  and other
organisms to specific  synfuel  related RAUs through atmospheric,  aquatic and food-
chain routes,    lexicological  data  on health  and  environmental  effects are  also
being assessed  in  an  effort  to  demonstrate cause  and  effect  relationships.   The
program is  also applying  previously  developed  risk  assessment  methodologies  to
various pollutant  control technology  processes and  options to evaluate their rela-
tive efficacies and merits,

J9g_3'Explanation of Changes .from Budget Estimate

     There is  no change from the Budget Estimate.

1982Accomplishments

     In 1982,   the  Agency obligated a total of 52,644,500  for  this program, of which
553,200 was under  the  Salaries  and  Expenses  appropriation and 52,591,300  was for
extramural  purposes under the Research and Development appropriation.
                                          E-13

-------
     Develop Healthand Envjrorinienta 1  Risk Analyses in Support of  ilj>_ _ and Permit-
ting Activities.  Chemical	'components or elements associatedwith syWu^V techncn'o-
gies were initially categorized  and  grouped  into about  4C  categories.   These cate-
gories were designated as RAUs,   An initial  assessment of  the  health  and environ-
mental risks of selected RAUs was made, largely through a compilation and synthesis
of existing data.  The exposure assessment portion of the program utilized the best
available data  from  source/pollutant   characterization  research  as  the  starting
point for industry  specific  risk analysis assessment.  Methodologies  for exposing
test organisms to selected RAUs were developed and tested.

ENVIRONMENTAt ENGINEERINGANDTECHNOLOGY

1984 Program Request

     In 1984, the Agency  requests a  total  of 37,124,900  and 26.7 permanent workyears
for this program, of which 52,539,600 is for Salaries and Expenses and 54,585,300 is
for Research and Development.  This  reflects  a decrease of  $833,600  and $1,674,400
respectively.  This reduction  reflects  the  de-emphasis  of  synfuels  research based
on the  slower  commercialization of this  industry and  the  transfer  of exploratory
research resources to  the Intermedia program.

     Develop arid Evaluate LIMB/Ldw NOx  Control  Technology.   Existing  pulverized
coal-Tireef utility  and Targe  industrial  boilers  are thelnajor  source of  SOX  and
NOX emissions.  Existing  control  technology  for  SOX is expensive for  new  systems
and difficult to retrofit for  existing  systems.   Thus,  the  LIMB  technology  will  be
evaluated to  achieve:    (1)  substantial  reductions  in  SOx and  NO*  emissions  at
about one-fifth of  the cost  of conventional  flue  gas desylfurization  systems;  (2)
50 to  70  percent  $0X  control  and  NOX emission  levels of  0.3 to  0.4  Ib/million
Btu thermal  input  for  retrofitting  existing  boilers; and  (3)  50  to  70 percent  SOX
control and  NQX emission  levels  of  0.2  to  0.3  Ib/million  Btu  for new  boiler
app1ications.

     A systematic  development is  necessary  to  bring  the  LIMB technology  to  the
point where  industry  would  be  willing  to commercialize  it.   To  accomplish this,
the 1984 program will  encompass the  following:  research on  the reaction mechanisms;
systematic research at the small  bench  and pilot scale for a wide range  of boiler
and fuel  types;  pilot scale  testing to extrapolate the performance  to  commercial
scale; detailed analysis  to  identify  potential  operability and reliability problems;
and field application  of the  technology  to  representative boilers.   Although  the
LIMB program  will   not encompass federally  funded full-scale  demonstrations,  EPA
will acquire and analyze performance data, and .disseminate results to the potential
users of LIMB systems.

     Characterize  and Evaluate  SynfuelsDischarges  and Control  Technologies in
Suppo'rt of fnvlronniental  'Impact Statements TE'lSTand Permitting3'Acti₯''iti'es.   Sxteri-
sive environmental   data  is  required for  the  construction  and operation  of United
States synthetic fuel   plants.   The  timely commercialization of  these  plants in an
environmentally acceptable manner necessitates  that the  Agency give technical assis-
tance to State and  Regional permitting officials*   This assistance Is based on exper-
tise gained by Agency research  on source characterizations of synfuel plant emissions
and control  technology evaluations.

     As the  synthetic  fuels  industry  begins   construction  and operation of their
plants, engineering support will  be  provided  to  State  and  Regional  authorities in
their review  of  EISs, permit application  and  Synthetic  Fuels  Corporation (SFC)
required monitoring plans. Consultation with the Agency  by SFC applicants  is  re-
quired by the  1980 Energy Security  Act (Public  Law  94-294),  Section  131  (e)  for
preparation of their environmental  monitoring  plans.  Emphasis is being  placed  on
technical  assistance  since   some synthetic  fuel  plants  will  be operational  and
evaluation will be  possible of the  pollution control  systems  associated with these
commercial scale operations.
                                          E-14

-------
     The Agency's  waste  water and air  pollution  control  systems  will  be utilized
to test more  sophisticated  pollution  controls and analyze waste  streams.   We  plan
to test  and  evaluate  controls  anc! waste  streams at  two  of  the  four  conrnercial
scale United  States coal  conversion  plants  currently under  construction  and  an
active United States oil stiale plant.

     The Agency  will   be  refining procedures  for comparative  combustion/sampling
testing of liquid  synthetic and petroleum based  fuels.   Furtner  studies  of these
fuels will analyze  vaporization  of hazardous  organics  from them in transportation,
handling and storage.

1983 Proaram
     In  1983,  the Agency  is  allocating  a  total  of 39,632,900 and  25.3 permanent
workyears to this  program,  of which 33,37.3,200 is  under the  Salaries  and Expenses
appropriation and  $6,259,700 is  for  extramural  purposes  under  the  Research  and
Development appropriation.

     Develop and Evaluate LIMB/low NQy Control ...Techno logy.   The performance of LIMB
system components process in a onemillTon BTU tange^nTfai ly-f ired and a one million
'BTU wall-fired furnace is being tested.  Boiler conditions  are being simulated, and
various  types of coals are being used and .evaluated.

     An  assessment  of  a low  NQX  burner at  Utah  Power  and Light Company  is  being
conducted, and an evaluation  of a  prototype  distributed mixing low  NOX coal  burner
is being  conducted  at  pilot plant scale to determine the extent  of  NOX capture in
both wall-fired and tangential ly-fired boilers.  A  variety of coal  types are  being
used and  analyzed.   These  data  are  needed to  review  NSPS  for utility  boilers.
Field evaluations are  being conducted  for a low NO^  burner at  the 25 MW Eastern
Illinois  Cooperative utility wall-fired boiler test site.

     Characterize and	Evaluate Synfuels  Discharges  and Control  Technologies. 1"
Supporj^Jo'f Enyi'rohmentaT Impact StatemenFlEIS) and Permi ttingActi vi ti es.  In  the'
design and construction  phase  of  United States synthetic  fuel  plants, there  are a
large number of EISs,  permits and SFC required monitoring plans.  The Agency will
continue  to provide  technical  assistance to State  and Regional  officials in  their
review of these documents, applications and plans.  Technical assistance is expa.nd-
ing since  the  Pollution  Control   Technical  Manuals and  the Monitoring  Reference
Manual have been  published,  and  more environmental research  data now  is available
from synfuel  pilot plant process technologies.  Research in source characterization
and control technology evaluation  is  being conducted utilizing the A.gency's mobile
test facility  and stationary facilities  at the  University  of North  Carolina and
North Carolina State University.

1983 Explanation of Changes froro Budget Estimate

     There is no change from the Budget Estimate.

1982 AccompJ [sjunents

     In  1982, the Agency obligated a total  of $12,820,900 for  this program, of which
S3,577,000 was under the Salaries and Expenses appropriation and  $9,243,900 was for
extramural purposes under the Research and Development appropriation.

     Develop andEvaluate LIMB/low NOX Control Technology.   Support for Federal and
State regulatory  compliance  was provided to the  California Air  Resources Board for
issuing  construction permits  for  heavy  oil/low NOX burners,  to  the Office  of Air
Quality Standards for  the  industrial  combustion modification  program, and the low
NOX emissions program wherein lean burning conditions are being examined.  Regional
support  in State Implementation .Plan compl iance was  provided through the preparation
of a  operations  and maintenance  practice  manual  for boilers.   A pilot evaluation
of a one million  8tu per hour wall-fired  furnace With  simulated boiler conditions
was conducted to test SOg removal  by the LIMB  process.
                                          E-15

-------
     Characterize and Evaluate Synfuels  .--.,..,_:.._..:
port  of £nv~ironnientalImpact Statement (E'iST "anQ~?ernrt€tng	Activities.STxpro-
cess specific  draft  Pollution  Control  Technical  Manuals  JPCTMs)  ana"  a  Control
Technology Appendix for coal based and oil shale fuels were completed.  The process
technologies addressed  in  the manuals are  direct  and  indirect  coal  liquefaction,
and three  different combinations  of oil  shale retorting  and  mining  operations.
The PCTMs  will  be  very  useful  to  the synfuel  industry  and oermitting  officials
since tney represent  unique  and  specific environmental data on  emissions  and con-
trols for synfuels  process technologies.

ENVIRONMENTAL PROCESSES AND EFFECTS

1984 Program Request

     The Agency requests no resources for this program in 1984.

1983Program

     In 1983, the Agency  is  allocating S450,000,  all  for extramural  purposes under
the Research and Development appropriation,

     Conduct Cold Climate Research.  Research  is being  completed on  the  impacts of
energy development  and  use in  cold climate  areas.   Emphasis  is  being placed  on
evaluating the effects of carbon monoxide emissions from mobile sources and assess-
ing the  impacts  of oil  and  gas  energy-related  activities  on permafrost  soils.

1983 Explanation of Changes from Budget Estimate

     There is no change from the Budget Estimate.

j.982Accompli shjents

     In 1982, the Agency obligated a total of $6,511,300 for this program,  of which
5506,200 was under  the  Salaries  and Expenses appropriation and  56,005,100 was for
extramural purposes under the Research and Development appropriation.

     Risk Analysis  for the Synfuel Industry.  Preliminary  environmental  risk anal-
yses were peer  reviewed to determine  the  adequacy  of the  technique  being tested.
Initial  atmospheric  studies  on  synfuel   plant  emissions  and transformation  rates
were initiated.  This  data  will  be  utilized  in the  exposure portion  of  the Inte-
grated Risk Analysis  Program.   Preliminary  toxicity  results of  studies  on complex
organic fuel mixtures  from  various  pilot  and  demonstration  synfuel  facilities were
completed.  This  information  will  be  utilized in the effects  of portion  of the
Integrated Risk Analysis Program.

     Conduct Cold Climate Research.  Two  reports  were  completed.   They  were  en-
titled;  (I)  An  Assessment _ojf^Solid Waste Disposal  Practtces_in_Alaska,  and  <2)
EPA's Cold Climate Research Needs.
                                          E-16

-------
                                        ENERGY

                                   Qxi'dants Energy

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Environmental Engineering
A  Technology
 Salaries 4 Expenses           $1,585.0     $410.9
 Research & Development       $11,851.4     S966.9
                       TOTAL  $13,436.4   $1,377.8
TOTAL:
 Salaries & Expenses
 Research & Development

Oxldants Energy
        $1,585,0
       $11,851.4
$410.9
$966.9
TOTAL  $13,436.4   $1,377.8
PERMANENT WORKYEARS
Environmental Engineering
&  Technology

TOTAL PERMANENT WORKYEARS
            20.5
            20.5
   5.3
   5.3
TOTAL HORKYEARS
Environmental  Engineering
& Technology

TOTAL WORKYEARS
            .31.0
            31.0
   8.4
   8.4
                                        E-17

-------
                                        ENERGY
                                    Qxidants Energy
Maj o r 0y tp u t s /M i 1 e s to ne s

Research and Assess Emission
Reduction Technologies

-  Report on the  applicability of
   in-furnace NOX reduction to
   domestically designed boiler and
   U.S. coals (Env. Technology)

-  Report on performance testing of
   combustion modifications applicable
   to spreader stoker boilers
   [Env. Technology)
Actual
 1982
12/83
12/82
Current
Estimate
  1983
Estimate
  1984
                                         E-18

-------
                                       ENERGY


                                  Oxidants Energy


Budget geauest.

     The Agency requests no resources for this program in 1984.

ENVIRONMENTAL ENGINEERING AND TECHNOLOGY

1983 Program

     The research in  this  program has been  transferred  to  the  Air Oxidants program
in 1983, .except  for  resources  associated with the  limestone  injection  multi-stage
burner (LIMB) which were consolidated in the Multi-Media Energy program.

1983 Explanation of Changes from Budget  Estimate

     the net decrease of -51,377,800 results from the following action:

     -Restructuring.  (-$1,377,800)    The  Congressionally  approved  restructuring
eliroinated the Gases  and  Particles  and  the Oxidants  -  Energy  program elements and
moved them  into  the  Air program elements.   This  allows for better management and
accountability of resources  because both Energy  and  Air have the  same  regulatory
program effort;  and,  the  end   products  are  air  regulations.   The change  to the
Salaries and Expenses appropriation  was  -.5410,900;  and,  the  change  to the  Research
and Development appropriation was -5966,900.

193 2 Ac c omp 1 i s htne n ts

     In 1982,  the  Agency  obligated a  total  of  513,436,400  to this  program,  of
which 51,585,000 was  under the  Salaries  and Expenses appropriation and  511,851,400
was for  extramural   purposes  under  the  Research  and  Development  appropriation.

     Research and Assess Em is sign Re d uc ti g n Techno 1o g i e s to S u pport P ermi 11i ng.New
Source Performance Standards THSPS), and CofnpTTance  Acti vi ties.  S  burner  manufac^
turer was se 1 ected to produce a cdmtnerci a 1 version of the heavy oil/low  MO^ burner;
and, the field evaluation  program  was conducted.   The  applicability of in-furnace
NOX reduction to  domestically designed boilers and United States coals was evaluated.
Performance testing  of  combustion  modifications  that  are applicable  to  spreader
stoker boilers  was  completed.    Combustion  modification  technologies,  such  as
reduced primary air, modification of fuel injection  velocities, etc., was evaluated
on a coal-fired kiln.  .Experiments  to identify how  the  physical  properties  of coal
are related  to  NOX  emissions under fuel-lean burning  conditions  were  conducted.
An operations and maintenance practice manual was  developed for burner manufacturers
and boiler owners and operators to assure compliance with regulations and to assure
that equipment is operated in a  safe  and reliable manner.   A pilot evaluation of a
one million BTU per  hour  wall-fired furnace  with simulated boiler conditions was
conducted to test SO? removal  by the LIMB process.
                                          Z-19

-------
                                        ENERGY

                              Gases and Particles Energy

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE *
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             19S4 VS 1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Environmental  Engineering
& Technology
 Salaries & Expenses           51,935.2   $1,8.03.7
 Research I Development        S7,546.0   $3,282.2
                       TOTAL   $9,481.2   $5,085.9

Environmental  Processes
I Effects
 Salaries 4 Expenses             $514.1     $283.0
 Research & Development        55,325.5   $3,250.5
                       TOTAL   $5,839,6   $3,533.5

TOTAL:
 Salaries & Expenses           $2,449.3   $2,086.7
 Research 4 Development       $12,871.5   $6,532,7

Gases and Particles    TOTAL  515,320.8   $8,619.4
Energy
PERMANENT WORKYEARS
Environmental  Engineering          25.5       18,7
4 Technology

Environmental  Processes             1.4        1.0
* Effects

TOTAL PERMANENT WORKYEARS          26.9       19.7


TOTAL WORKYEARS
Environmental Engineering          37.1       31.2
4 Technology

Environmental Processes            11.5        5.6
« Effects
TOTAL WORKYEARS                    48.6       36.8
                                        E-20

-------
                                        ENERGY


                               Gases and Particles Energy

                                                             Current
                                                Actual        Estimate       Estimate
Major Outputs/Ml 1estones                         1982          1983           1984

Research and Assess Emissions
Reduction Technologies

     -  Report on pilot field SOX capture       9/82
        evaluations of spray-dryer/fabric
        filter systems for 1985 NSPS review,

     -  Report on full scale adipic             9/82
        acid enhanced limestone FGD
        technology for 1985 NSPS review.

Develop and Validate Air Quality
Models

     -  A regional visibility model
        for developing visibility               9/82
        regulations.

     -  Report on the results Of
        Small  Hill Plume Impaction              9/82
        Study Number 1 for devel-
        opment of a complex terrain
        model.
                                         E-21

-------
                                         ENERGY
                                Gases and Particles Energy



Budget Request

     The Agency requests no resources for this program in 1934.

ENVIRONMENTAL_ENGINEERING AND TECHNOIOGY

1983 Program

     Resources for  this  program have been  transferred  to the Gases  and  Particles
Air program in 19833  except  for resources associated with  the  limestone  injection
multi-stage burner  (LIMB)  which  have been  consolidated  in the Multi-Media  Energy
program.

1983 ExplanationofChangesfrom BudgetEstimate

     The net decrease of -S5,085,900 results from the following  actions:

     -Restructuring.  (-55,085,900)   The  Congressionally  approved  restructuring
eliminated the Gases  and Particles  and  the Oxidants - Energy program  elements  and
moved them  into  the Air .program elements.  This  allows  for  better  management  and
accountability of  resources  because both Energy  and  Air have the  same  regulatory
program effort;  and.,  the  end products  are  air  regulations.  The  change  to  the
Salaries and Expenses appropriation  was  -$1,803,700 and  the  change  to  the  Research
and Development appropriation was -53,282,200.

1982 Accomplisments

     In 1982,   the  Agency  obligated a  total   of  59,481,200  for  this program,  of
which $1,935,200  was under the  Salaries  and  Expenses appropriation and  $7,546,000
was for  extramural   purposes  under  the  Research and  Development  appropriation.

     Research  and  Assess .Emission jeduc_t1on_Jechno1ogi'es to Support Permitting  and
Comp1iance Activities\  During 1982 major technology  transfer efforts included con-
ducting the Seventh.'FTue Gas  Desulfurization (FGD) Symposium, co-sponsored with  the
Electric Power Research  Institute,  and  the Fourth Symposium on  the  Transfer  and
Utilization of Particle Control  Technology,  to transfer  the latest  findings  to  the
regulated and  regulating communities.

     An initial  assessment on  the  use  of adipic  acid  to  enhance limestone  FGD
systems in use  confirmed that SOX  removal  can  be  increased from  70% to 905  and
that the use of  the technology  should permit compliance with SOX  emission  regula-
tions for utility boilers.

     The cost-effective  advantage   of   combined  SOX and  particle  control   using
dry-scrubbing  with  fabric  filter baghouses was assessed and found to be  superior
to conventional FGD systems for low and medium sulfur content coals.

     A fundamental   research effort  was  initiated  to  determine the  basic  mechanisms
of, and to  account  for, the  exceptional  performances  of  two-stage  electrostatic
precipitators  (ESP's) and  electrostatically enhanced  fabric filters (ESFF).   Test-
ing of alternative  types of  two-stage  ESP's in a flexible  engineering scale pilot
plant was initiated  to  determine their  potential  for low sulfur coal  fly  ash col-
lection, and an ESFF  baghouse  was  tested in a  pilot  unit.   Both  technologies show
                                          E-22

-------
that up  to  a 50« reduction  in  operating and  capital  costs can  be  expected,   the
limestone injection multistage  burner  (LIMB)  process  was  tested  on a tangentially-
firsci pilot  furnace.

ENVIRONMENTAL PROCESSES AND EFFECTS
1983 .P rogratn

    Resources for  this  program have  been transferred  to  the Gases  and  Particles
Air program in 1983.

1983 Explanationof Changes from Budget Estjmate

     The net decrease of -53,533,500 results from the following actions:

     -Restructuring.  (-$3,483,500)   The  Congressional!,/  approved  restructuring
eliminated the Gases  and  Particles and the Oxidants  -  Energy program elements and
raoved them  into  the Air program elements.   This allows for  better management and
accountability of  resources  because both Energy  and  Air have the  same regulatory
program effort and  the  end products are  air regulations.   The change to  the Sala-
ries and  Expenses  appropriation was -$233,000  and  the  change to the  Research and
Development appropriation was --$3,250,500.

     -Reprogramnn'ngs,  (-$50,000)   During  the   development  of the  operating plan,
several reprogramraings were  raade to this activity  which are  not  reportable under
the Congressional  reprogramming limitations.   These  changes  resulted  in  a  net
decrease of -$50,000 to the Salaries and Expenses appropriation.

1982 Accomplishments        '                          '

     In 1982, the Agency obligated a total of 55,839,600 for this program, of which
$514,100 was under  the  Salaries and Expenses appropriation and  $5,325,500  was for
extramural purposes under the Research and Development appropriation.

     Develop and Validate Air Quality Models  to  Support  Implementation,  Hainte-
jTance  and £ nforcementof MAQS.  Research on the development of improved air qual-
itydispersion modefsfor use  in  complex terrain concentrated  on  plume  impaction
on elevated terrain, involving both field  studies and physical  modeling experiments.
The results  of  Small Hill  Plume  Impaction  Study Number 1  were published  in the
fall of 1982, and  Study Number 2  was  initiated.   A study of  plume Impaction  on a
two-dimensional  ridge  was conducted.   The  Green River  Ambient Model  Assessment
Study's first modeling output,  a mountain valley air  quality  model, was completed.
In addition, a  simple regional  visibility  model  for use in  developing visibility
protection regulations was completed.
                                          E-23

-------
                                        ENERGY

                                 Water Quality Energy
                                ACTUAL   BUDGET
                                 198.2    ESTIMATE
                                           1983
                 CURRENT
                 ESTIMATE
                   1983
ESTIMATE  INCREASE +
  1984    DECREASE -
         1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Environmental Processes
& Effects
 Salaries & Expenses             $645.0
 Research & Development        52,756.6
                       TOTAL   S3,40.1.6

TOTAL:
 Salaries & Expenses             $645.0
 Research & Development        $2,756.6

Water Quality Energy   TOTAL   53,401.6
PERMANENT WORKYEARS
Environmental Processes
& Effects

TOTAL PERMANENT WORKYEARS
 6.3


 6.3
TOTAL WORKYEARS
Environmental Processes
& Effects

TOTAL WORKYEARS
10.4


10.4
                                         :-24

-------
                                        ENERGY


                                  Water  Quality  Energy


                                                            Current
                                                Actual       Estimate       Estimate
Major Outputs/Hnestones                         1982          1983             1984 _

Risk Analysis for Water Pollution

-  A report describing the factors which         8/82
   affect the nobilization,  transport, and
   bioavailability of mercury  in reservoirs
   located in the upper Missouri River
   Basin, (Env.  Proc.)

-  A report describing the effects of             8/82
   sediment-borne fuel oils  on intertidal
   fauna! recruitment. (Env.  Proc.)
                                         E-25

-------
                                        ENERGY


                                  Water Quality Energy


BudgetRequest

     The Agency requests no resources for this program in 1984.

EHVIiiONMENTAL PROCESSES AMD EFFECTS

1983 Program

     No resources are  allocated  for  this  program  in  1983.   Resources for this pro-
gram have been  transferred  to the Multi-Media  Energy program to  conduct  research
in support  of  the development  of health  and environmental  risk assessments  for
synfuels, and to  the  Hazardous  Waste program to conduct hazardous site  assessment
research.

1982 Accomplishments
                                             X
     In 1982,  the Agency  obligated  a  total  of  33,401,600  for  this program,  of
which 5645,000  was  under the  Salaries and  Expenses appropriation  and  32,756,600
was for  extramural  resources  under the  Research  and  Development  appropriation,

     Risk Analysis for Wa:ter Pol 1 ution.  Reports were completed  on  the  following:
(1) a  noivequil ibrium  approach   to model ing  heavy metals  in acid  flowing  waters;
(2) the effects  of  sediment-borne fuel  oils on  intertida!  fauna  recruitment;  and
(3) the  factor.s  affecting  mobilization,  transport, and bioavailabil ity  of  mercury
in reservoirs of the  upper Missouri River Basin,  Each of these reports will  assist
various Regions and States  in the  establishment of more  realistic  wa.ste  load allo-
cations for  conservative  materials,  such  as metals, and  help establish the need
for more stringent State water quality  standards.
                                         £-26

-------
                                        ENERGY

                             Industrial  Wastewater Energy

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Environmental Engineering
& Technology
 Salaries & Expenses             S870.8
 Research & Development          $757.7
                       TOTAL   $1,628.5

TOTAL;
 Salaries 4 Expenses             $870.8
 Research & Development          5757.7

Industrial Wastewater  TOTAL   $1,628.5
Energy
PERMANENT WORKYEARS
Environmental  Engineering          :13.7
& Technology

TOTAL PERMANENT WORKYEARS          13.7


TOTAL WORKYEARS
Environmental Engineering          21.0
& Technology

TOTAL WORKYEARS                    21.0
                                        E.-27

-------
                                        ENERGY
                              .Industrial  Wastewater Energy
Ha jo r 0u tp u t s /H i 1 e s to n e s

Evaluate technologies for
reducing pollution caused by
fuel extraction

-  Cowolete evaluations of cooling
   water effluents from stream
   electric po.wer plants - used
   for the effluent guidelines
   data base
Actual
 1982
  9/82
Current
Estimate
 1983
Estimate
   1984
                                         E-28

-------
                                        ENERGY


                              Industrial  Wastewater Energy


Budget Request

     The Agency requests no resources for this program in 1984.

ENVIRONMENTAL ENGINEERING. AND TECHNOLOGY

1983 Program

     The Agency allocated no resources  for  this  program  in 1983.  The  research  was
completed In 1982 and  any  additional  requirements are being conducted  in  the  base
research program.

1982 Accomplisnments

     In 1982; the Agency obligated a total  of $1,628,500  to this program,  of  which
$870,800 was under  the Salaries  and  Expenses appropriation and  $757,700 was  for
extramural  purposes under the Research  and Development appropriation,

     Evaluate technologies  for  reducing pollution caused by  fuel  extraction.   The
fuel extraction program  was  completed  in 1982 with the  final  evaluation  of  tech-
nologies for reducing  pollution  to  surface and  groundwater  caused by  the  surface
mining of coal  in the Northern Great Plains  area.
                                         E-Z9

-------
                                        ENERGY

                               Municipal Spills Energy
                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE -
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Environmental Engineering
& Technology
 Salaries & Expenses
 Research & Development
                       TOTAL

TOTAL:
 Salaries & Expenses
 Research & Development
Municipal Spills
Energy
TOTAL
          5120.0
          $406.1
          $526.1
$120.0
$406.1

$526.1
PERMANENT WORKYEARS
Environmental Engineering
& Technology

TOTAL PERMANENT WORKYEARS
             3.5


             3.5
TOTAL WORK YEARS
Environmental Engineering
& Technology

TOTAL WORKYEARS
             3.5


             3.5
                                        £-30

-------
                                        ENERGY
                                Municipal  Spills Energy
Major Qutpjts/Hile stones

Develop techniques and procedures
to prevent and contain hazardous
spi-lls

-  Develop impoundment/waste lagoon
   spillage controls

-  Develop guidelines for using
   dispersants for controlling
   spills

<•  Evaluate sorbents to contain
   hazardous spills

-  Develop manual s on spill  prevention

-  Evaluate foam/chemical layers to
   control air dispersion from spills

-  Develop manuals for Shoreline
   cleanup of spills

-  Develop fire control  handbook for
   hazardous substances
         Current
Actual   Estimate
 1982      1983
 9/84


 9/84



 1/84


12/82

12/82


 9/82


12/83
Estimate
  1984
                                         E-31

-------
                                        ENERGY


                                Municipal  Spills Energy


Budget Request

     The Agency requests no resources for this program in 1984.

ENVIRONME:HTAL ENGINEER ING AND TECHNOLOGY

1,983 Program

     This program  has  been  transferred to  the  Hazardous Waste  program in  19.83.

198? Accompli shments

     In 1982, the  Agency  obligated  a total  of 5526,100  for  this  program, of  which
$120,000 was under the  Salaries and Expenses appropriation  and  $406,100 was  for
extramural  purposes under the Research and Development appropriation,

     Develop  Techniques  and  Procedures  to Prevent and Contain  Hazardous  Spills.
Research in 1982 supported the regulatory requirements  for spill  prevention,  control
and countermeasure  plans  for  all  facilities engaged  in  the production,  storage,
refining, processing and distribution of hazardous materials.
                                         £-32

-------
Page Intentionally Blank

-------
Management and
    Support
      SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
MANAGEMENT S SUPPORT                                                        MS-1

    PROGRAM MANAGEMENT
       Program Management	  MS-7
          Program Management - A1r, Noise & Radiation	  MS-9
          Program Management - Water...	  MS-10
          Program Management - Pesticides & Toxic Substances.,	,.  MS-10
          Program Management - Research 4 Development..	..  MS-11
          Program Management - Solid Waste 4 Emergency Response....	  MS-12
    AGENCY MANAGEMENT
       Office of the Administrator/Executive Offices	  MS-14
          Immediate Office of the Administrator..	,	  MS-21
          Regulatory Information Service Center	  MS-22
          Administrator's Representation Fund......	,.	  MS-22
          Office of Executive Secretariat	,	  MS-23
          Office of Management Services......	...............	  MS-23
          Science Advisory Board	,	  MS-24
          Office of Legislation	  MS-25
          Office of International Activities	  MS-25
          Office of Civil Rights	  MS-27
          Office of Public Affairs	..".	  MS-29
          Office of Federal  Activities	,	  MS-30
          Office of Administrative Law Judges	>...	  MS-31
          Office of Intergovernmental Liaison	  MS-32
          Office of SmalJ A Oisadvantaged Business  Utilization	  MS-33
          Office of Inspector General	,	  MS-33
       Office of Policy 8 Resource Management	,	  MS-35
          Program Management - Policy & Resource Management	  MS-38
          Office of the Comptroller	  MS-38
          Program Integration Project	  MS-3.9
          Office of Policy Analysis	,	  MS-40
          Office of Standards and Regulations	  MS-41
          Office of Management Systems 4 Evaluation	....".	  MS-42
       Office of Legal  & Enforcement Counsel,	  MS-44
          Program Management - Legal  & Enforcement Counsel....	.,  MS-45
          General Counsel	,	  MS-46
          Regional  Counsel	  MS-47
       Office of Administration...	  MS-49
          Program Management - Admi ni strati on	,...	  MS-53
          Financial Management - Headquarters.....,...,,....	  MS-54
          Contracts S Grants Management	  HS-55
          Personnel 4 Organization Services	  MS-57
          Facilities 4 Management Services	  MS-58
          Information Systems & Services.....	,	  MS-60
                                       MS-1

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
MANAGEMENT   SUPPORTjcorit. )
       Regional Management. .-,,....,...,.., ................. . ...............  MS -63
          Regional Management ........ . ...... .......... ...... .... ...........  MS-65
          Planning, Evaluation, & Analysis - Regions...', ....... . ..........  MS-66
          Financial Management - Regions ...... , ..... .... ........... . .......  MS-67
          Personnel Management - Regions ..................................  MS-68
          Administrative Management - Regions ............ .................  MS-69
   SUPPORT COSTS
       Support Costs [[[ > . .  MS-72
          Nationwide Support Services ....................... . .............  MS-74
          Headquarters Support Services ..... , .......... ...................  MS-74
          Regional Support Services. ____ , .................. . ........ . ......  MS-76
          ADP Support Costs ............ ..... ...... . ................ ........  MS-76
          Professional Training ................... . ................ , --------  MS -77
          Lab Support - Research & Development. . . , . . ......... .......... , . .  MS-78
          Lab Support - Air, Noise & Radiation .................... ........  MS-78

-------
                                   MANAGEMENT AND SUPPORT

                                ACTUAL   BUDGET     CURRENT   £STIMATE  INCREASE *
                                 1982    ESTIMATE   ESTIMATE    198*    DECREASE -
                                           1983       1983             1984 VS 1983
                                (DOLLARS IN THOUSANDS)

APPROPRIATION
 Salaries 4 Expenses         $221,237.8 $230,273.8 S231,484.0 $232,022.7     S538.7
 Operations, Research &          $114.4
 Facilities

TOTAL, Agency Management &   $221,,352.2 S230.273.8 $231,484.0 SS232..022.7    S538.7
       Support


PERMANENT WORKYEARS             2,293.8    2,098.8    2,204.1    2,116.7      -87.4
TOTAL WORKYEARS                 2,860.7    2,532.8    2,723.6    2,627.4      -96.2
OUTLAYS                      $211,634.0 S235,438.0 $228,361.0 $225,901.0  -S3 ,960.0
AUTHORIZATION LEVELS
                                       MS-3

-------
                               MANAGEMENT AND SUPPORT


OVERVIEW AND STRATEGY

     Management and  Support provides  executive  direction  for  alJ  EPA  programs,
associated staff  and management  activities,  and  those  Agencywide  administrative
anc support services which are not associates with one specific program.

     The scope  of  management  and  support activities  is  largely  a  function  of  the
programs they  serve.   The  level  of  funding  requested for  this  medium,  therefore,
supports the  planned level  of program  activity.   Further,  the request  reflects
the belief  that,   by  eliminating  duplicative  functions,  focusing  on  essential
services, increasing efficiency,  and introducing  a  strong accountability  system,
the Agency  can provide  more   effective  management  activities  at  less  cost  than
would otherwise occur.

     The major components in thi-s  medium are Program Management,  Agency Management,
Regional Management, and Support Costs.

     The Program Management component includes policy development,  program develop-
ment and oversight,  and  the  associated  management activities  for the  Agency's  en-
vironmental  program offices.   These include the Offices of Air, Noise, and Radiation;
Water; Pesticides  .and  Toxic  Substances;  Research and Development; and  Solid Waste
and Emergency Response.

     The Agency Management  component contains  the  Offices  of  the  Administrator,
Policy .and Resource  Management, Legal and  Enforcement Counsel,  and Administration.

     The Regional  Management component includes the  Offices of the  Regional  Admin-
istrators and  those  centralized  management and administrative  functions  performed
in each Region.

     The Support  Costs  component  contains  nonpersonnel  costs for Agency  services
such as laboratory  and office  supplies,  building  operations and maintenance, local
telephone service   and  other utilities,  telecommunications,   rental  costs for  our
facilities,  a.nd central  computer  services.   There  are three  categories  within
this general  component:  Agency;  Regional;  and, Program Support Services.   Agency
Support Services include all  office and building services for Headquarters, Research
Triangle Park,  North Carolina  (RTP),  and  Cincinnati,  Ohio,  as  well  as  certain
Ageneywide services  which   are managed  on  a  centralized  level,  e.g.,  facility
rentals., Federal  Telecommunications  Services,  and  ADP  support  costs.   Regional
Support Services provide common  services in  the  Regional  Offices,  such  as  office
supplies, equipment,  printing, and  local  telephones.   Program  Lab  Support  funds
provide general operating  services to specific  program  facilities  or laboratories.

AREAS OF MAJOREMPHASIS

     The Executive  Offices,  which  include the  Immediate  Office  of  the  Adminis-
trator, are  emphasizing  better internal  management  to allow  more focused  respon-
siveness to  the Administrator's  priorities.   Priorities in 1984 will  include  im-
proved relations with States and local  governments to facilitate program delegation
as well as other integrated approaches toi environmental regulation; greater scienti-
fic credibility in   regulatory  decision-making  through  the  increased emphasis  on
reviews by the  Science Advisory Board;   improved  coordination  among  major outreach
staff offices  to  ensure  that  EPA's  external  activities reflect the  interests  and
policies of  the Administrator;  and,  continued efforts to eliminate  the  backlog of
construction grant final  audits.

     In the Office of Policy and Resource Management (OP.RM), the Agency is develop-
ing a  framework for a  well-run strategic planning and raanagetiient process to ensure
that EPA's program  objectives  and environmental .goals are  clearly  defined and met.
                                      MS-4

-------
Trie emphasis will  be toward  a  stronger arid  more  coherent  regulatory  development
and review process.  This will subsequently  improve  both  the process  and  substance
of regulatory  decision-making by  enhancing  our  ability  to  measure the  benefits
associated witn  Tiajor  regulations,  and improving the  scientific snd  engineering
analysis that supports  the regulation development proces.s.

     The Office  of  Legal  and Enforcement  Counsel  (OLEC)   performs  both  general
management and  legal  services in  this  medium.   !n  addition to  providing  routine
legal  support  to  the various  offices  of  the Agency,  OLEC  efforts  in 1984  will
focus on  developing  policies  to  assure  consistent  Agencywide  legal  interpreta-
tions, elimination of  duplicative  legal  reviews,  and adequate  legal  support  to
States seeking  to  assume environmental  programs.   In addition,  emphasis  will  be
placed on  coordination   with  enforcement  efforts  to  assure  the success  of  the
Agency'.s civil  and criminal  litigation .or other noncompliance remedies.

     In 1934,  the  Office of  Administration  .{OA),  building   upon  initiatives  begun
in 1982  and  1983,  will   continue to  institutionalize  a  cost-consciousness  in  all
the various  functions .and activities for  which  we  have  responsipil ity*   We  will
work to  improve  EPA's  financial   management system  so .that  it is more  controlled
and disciplined, though  still  responsive  to  both  Agency-wide  and program-specific
needs.  We will  consolidate management and control  over Agency  ADP systems  in a
central  office  within OA to  eliminate  duplicative  systems  and redirect  resources
to improve access  to automated  data bases and efficient  electronic  communications
systems.  We will  continue  to automate  systems,  wherever  practical,  and to upgrade
the information  available  to  EPA's  senior  managers.  By  simplifying  and  stream-
lining our  procurement  and  contracting processes  in a  fiscally  sound  way,  we
will make  it easier  for  EPA programs  to achieve  their  missions  without  sacrificing
financial integrity.   Lastly,  OA will  develop a  human resources  management  system
designed to meet EPA's  policies and goals,  which  ensures  that we have an adequately
trained and skilled workforce  in  the most cost-effective  manner.

     In the Regional  management  areas,  resources provide  services  consistent with
Regional program  workforce  levels.   With  o.ur  commitment  to  strengthen  Regional
environmental programs,   we  have  maintained  strong   Regional  planning,  resources
planning and analysis,  and management efforts.

     We are requesting full funding for those fixed costs  carried  within  the Sup-
port Services accounts.   At the  same  time,  we are  developing strategies to  contain
those costs  over which  we  have  control.   In Headquarters,  for  instance,  we  are
consolidating Agency   space  holdings  and  have   instituted  accountability  systems
for telephone and mail  services.    We  are building  upon cost  containment strategies
developed and  implemented  during   1982  and  1983,  including  initiatives  such  as
centralizing our distribution  functions,  strengthening ADP  audits,  maintaining a
tight strategy  for training  EPA  employees  which  assures maximum  benefit  to  the
Agency, and continuing  to control our printing activities.
                                      -MS-5

-------
Page Intentionally Blank

-------
  Program
Management
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL  PROTECTION  AGENCY

                               1984 Budget Estimate

                                Table of Contents
MANAGEMENT_& SUPPORT

   PROGRAM MANAGEMENT
     Program Management.	  MS-7
          Program Management - Air,  Noise &  Radiation	  MS-9
          Program Management - Water......	,	,	  MS-10
          Program Management - Pesticides &  Toxic  Substances	  MS-10
          Program Management - Research  4 Development	  MS-11
          Program Management - Solid Waste & Emergency Response	  MS-'12
                                        MS-6

-------
Page Intentionally Blank

-------
                                  PROGRAM MANAGEMENT

                                  Program Management

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE +
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE -
                                           1983       1983             1984 V.S  1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Program Management -
Air, Noise and
Radiation
 Salaries i Expenses           52,136.7   $2,147.7   $2,143.8   52,163.0     $19.2
                       TOTAL   S2.136.7   $2,147.7   $2,143.8   $2,163.0     519.2

Program Management -
Water
 Salaries & Expenses           $2,477.3   $2,570.5   $2,566.7   $2,411.4   -$155.3
                       TOTAL   $2,477.3   $2,570.5   $2,566.7   $2,411.4   -$155.3

Program Management -
Pesticides and Toxic
Substances
 Salaries & Expenses           $2,428.4   $2,693.1   $2,698.1   $2,464.8   -$233.3
                       TOTAL   $2,428.4   $2,693.1   $2,698.1   $2,464.8   -$233.3

Program Management -                    •
Research & Development
 Salaries & Expenses           $3',710.2   $4,011.5   $3,996.8   $3,949.3    -547.5
 Operations, Research &           $28.3
 Facilities
                       TOTAL   $3,738.5   $4,011.5   $3,996.8   $3,949.3    -$47.5

Program Management -
Solid Waste and
Emergency Response
 Salaries & Expenses             $786.2     $463.4     $850.1   $1,352.5    $502.4
                       TOTAL     $786.2     $463.4     $850.1   $1,352.5    $502.4

TOTAL:
 Salaries & Expenses          $11,538.8  $11,886.2  $12,255.5  $12,341.0     585.5
 Operations, Research &           $28.3
 Facilities

Program Management     TOTAL  $11,;567.1  $11,886.2  $12,255.5  $12,341.0     $85.5


PERMANENT WORK YEARS
Program Management -               44.4       37.2       37.2       37.2
Air, Noise and
Radiation

Program Management -               40.3       39.6       41.6.      39.6      -2.0
Water
                                       MS-7

-------
                                  PROGRAM  MANAGEMENT

                                  Program  Management

                                ACTUAL    BUDGET     CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE -
                                           1983        1983              1984 VS 1983
                                (DOLLARS  IN  THOUSANDS)
°rogram Management -
Pesticides and Toxic
Substances

Program Management -
Research & Development

Program Management -
Solid Waste and
Emergency Response

TOTAL PERMANENT WORKYEARS
 50.4       40.0       42.0       40.0       -2.0
 63.4       49.2       48.9        47.2       -1.7
 11.5        6.6       20.5       21.6        1,1
210.0      172.6      190.2      185.6       -4.6
TOTAL WORKYEARS
Program Management -
Air, Noise and
Radiation

Program Management -
Water

Program Management -
Pesticides and Toxic
Substances

Program Management -
Research & Development

Program Management -
Solid Waste and
Emergency Response

TOTAL WORKYEARS
                                   49.1
            47.8       46.£
47.8       1.0
 45.0       56.6       54.3       48.6       -5.7
 60.2       59.3       57.9       56.3      -1.6
 80,6       66.8       65.0     '  63.8      -1.2
 17.2        8.7       22.6       27.0       4.4
252.1      239.2      246.6      243.5      -3.1
                                      MS-8

-------
                               MANAGEMENT AND SUPPORT

                                 Program Management
Budget Request
     The Agency requests a total of $12,341,000 for Salaries and Expenses and 135.6
permanent workyears for 1984.   This reflects an increase of $85,500  and  a decrease
of 4,6 permanent workyears.  Overall, the decrease in workyears  results  from a re-
duction in administrative and management overhead as well  as  the  emphasis  on .allo-
cating resources to higher priority programs.

Program Description

     The Program Management  component  provides resources  generally  for  the  Assis-
tant Administrators, Office  Directors  and  their Immediate  staffs,  for  EPA's  five
major program Offices; Air,  Noise  and  Radiation;  Water; Pesticides  and  Toxic Sub-
stances; Research and Development;  and  Solid Waste  and  Emergency Response.   Resour-
ces provide  for formulation  of overall  management and programmatic policy,  and
centralized planning and  budgeting.  Activities also include the coordination  and
integration of programs throughout the  Agency as well as performing  liaison activi-
ties with Congress, OMB and other Federal  Agencies  and  States.


PROGRAM MANAGEMENT - AIR. NO ISE AND RAD IATION

1984 Program Request

     The Agency  requests  a  total  of  52,163,000 and 37.2  permanent  workyears  for
this program, all  of  which  is  for  Salaries and Expenses.  This  represents  an  in-
crease of 5,19,200  from 1983  to fund increased  personnel  costs  for  public  health
service employees-   In  1984, the  emphasis  of  the  program will  once again  be  on
effective and  efficient  general   management;   strategic  planning;   administrative
and budget support; and  policy  development  and direction.  This  program will  con-
tinue to develop policies related to legislative mandates.

1983 Program

     In 1983, the Agency  is  allocating  52,143,800 and 37,2  permanent  workyears  for
this program, all  of  which  is  for Salaries and Expenses.  Major program  emphases
for 1983  are  implementation of the  Clean  Air  Act  Amendments of 1977,  the  Atomic
Energy Act,  the  Uranium Mill  Tailings  Radiation Control  Act,  and   development  of
major policies related to these acts.
                                                                            /
1983 Explanation of Changes from Budget Estimate

     The net decrease of -S3,900 results from the following action:

     -Congressional Action.  (-$3,900)   A general  reduction of -$1,350,000 was made
to Management and Support activities and was applied proportionately  to all offices
in that media in the Salaries and Expenses  appropriation.


1982 Aceomp1 i shroents

     In 1982, the  Agency  obligated 52,136,700  for this  program,  all  of  which  was
for Salaries and  Expenses.   The program provided  executive  management,  strategic
planning and  analysis,  and  budget and administrative  support  to   OANR programs.
Work continued  on  reauthorization  of the Clean Air Act and  the  orderly phase-out
of the Noise Office was completed.
                                       MS-9

-------
PROGRAM MANAGEMENT - WATER
     The Agency  requests  S2, 411,400  for Salaries  and  expenses and  39.6  permanent
workyea.rs.  This  represents  a decrease  of $155,300 and  2.0 permanent  workyears.
This reduction  is attributable to the  anticipated cornel etion of  work  by  a  staff
task force which  reports  to  t,1e  Intra-Agency Sludge  Policy  Comraittee.    Tne  Com-
mittee recommendations  will   be  implemented  in  1984  by  the appropriate  program
offices.  The  request  supports the continued  development  and implementation  of  a
reoriented national  regulatory  program  for  the  Water Quality  and Drinking  Water
media and  for their enforcement  program.   Resources  are  provided  for  developing
strategies for  water programs  throughout  the Agency;  management directions  and
supervision of organizations; management of the Office  of  Water  operating outdance
and accountability system; development  of  program  plans  and  budget for itnol ementa-
tion of Agency policies and programs  and tracking  of  budget  execution;  administra-
tive management,  and  analysts of  policy  issues  and monitoring of program perfor-
mance from both a scientific and programmatic perspective.

1933 Program

     In 1983,  the Agency  is  allocating $2,5<56,7QQ for  Salaries   and Expenses  and
41.6 permanent workyears.   The  Agency will  continue  to  focus on  the  reauthoriza-
tion process  for  the  Clean  Water  Act,  the Safe  Drinking Water Act  and  the Marine
Protection and Sanctuaries  Act;  accompanying  that process will be the  development
of strategies  to  implement  amendments.  Also  in  this program is  a task  force  on
municipal sludge policy which  reports  to the  Intra-Agency  Sludge  Policy  Committee.
The task  force will  prepare  guidance  on  the disposal  and   utilization  of sludge
and will  review  the  need for,  and possible  structure  of,  additional  or  altered
EPA regulations governing sludge management activities.

1983 Exp 1 anati on of Changes  from Budget Estimate

     The net decrease of -33,800 results from the following action:

     -Congressional Action.   (-53,800)  A general  reduction of -31,350,000 was made
to Management  and Support activities and was .applied proportionately to all offices
in that media  in the Salaries and Expenses  appropriation.

1982 Accompli shments

     In 1982,  this program obligated 32,477,300 for Salaries and  Expenses,  A major
focus was to  improve Office  of Water management through increased and  better pro-
gram integration  and redirection  of major activities  such as Construction Grants.
Another focus  was  the  Construction  Grants amendments to  the  Clean Water  Act  and
the implementation of these  amendments.


PROGRAM MANAGEMENT - PESTICIDES AND TOXIC SUBSTANCES

1934 Program ^Request

     The Agency  requests  $2,464,800  for Salaries  and Expenses  and 40.0  permanent
workyears, a  reduction  of   $233,300  and  2  permanent  workyears.  The  decreases
reflect reduced  requirements  for  general administration  and  oversight.   These
resources will provide  for   senior level  management  of the  pesticides  and  .toxic
substances program as well  as for the  immediate  office of  the  Assistant Adminis-
trator for Pesticides  and Toxic  Substances.   Senior  management  will  continue  to
emphasize sound  scientific  judgment  in .decision making  and  maintenance  of backlog
levels at or near zero.
                                       MS^IO

-------
1983 Program

     In 1983, the Agency 1s allocating 52,698,100 in Salaries and Expenses  and  42.0
permanent workyears for this program.   Management  will  build on the efforts begun
in 1982 to reduce backlogs and will  emphasize the use of sound scientific judgment.

1983 Explanation of Changes frorojiudgetEstimate

     The net increase of +55,000 results from the following actions:

     -Cpngressiona 1 Actions.   (+$55,000)  EPA's application of Congressional  action
to this activityresulted in the following changes.

     (+559,700)  This increase includes +$59,700 of the $10.5 million  Salaries and
Expenses add-on  which  supports  the  480 additional  permanent full-time work/ears
provided to the Agency.

     (-$4,700)  A general  reduction of -$1,350,000 was made  to Management and Support
activities and  was  applied proportionately  to all  offices in  that media in  the
Salaries and Expenses appropriation.

     -Reprograninn'ngs.   (-550,000)  During  the development  of the operating plan,
several reprogrammings  .were made to  this activity  which  are not  reportable under
the Congressional reprogramming limitations.

1982 Aceomp1i shments

     In 1982,  the  Agency  obligated  $2,428,400  for  this  program, all  under  the
Salaries and  Expenses  appropriation.   The  major  accomplishment 1n 1982  was  the
large reduction  in  pesticides  and  toxic  substances  processing backlogs  achieved
under the policy and direction of senior level management.

PROGRAM MANAGEMENT - RESEARCH  AND DEVELOPMENT

1984 Program Request

     The Agency requests  a  total  of  53,949,300 for Salaries  and Expenses  and  47.2
permanent workyears, decreases  of $47,500 and  1.7 permanent workyears from  1983.
These decreases result from the  implementation  of  an automated planning and track-
ing system which will monitor ORD program resources and link performance and outputs
with- budget plans.

     In 1984, efforts will  continue  to ensure the  integration  of  research efforts
at Headquarters, in  laboratories and  field  sites,  as  well  as  to coordinate  the
research program  planning cycle  for ORD,  including the  development  of  research
strategies and  program  plans  and  conducting  program  reviews  when   appropriate.
Resources requested will  continue  to provide on-site coordination and  support for
the ORD laboratories in Cincinnati and Research Triangle  Park.  Also  included are
resources to operate and enhance the  ORD information systems.

1983 Program

     In 1983, the  Agency  is  allocating  a total  of S3,996,800  for  Salaries  and
Expenses and  48.9  permanent workyears  to this  program.   The  activities  provided
for by  these resources  are required  on  a   continuing basis  to  provide  overall
direction and support for  the  scientific,  technical,  and  administrative management
of EPA's research and development programs.

1983 Explanation of Changes from Budget Estimate

     The net decrease of -514,700 results from the following action:
                                      MS-U

-------
     -Congressional Action.   (-514,700)   A  general  reduction  of  -51,350,000  was
made to Management  and Support  activities  an-d  was applied proportionately  to  all
offices in that media in the Salaries and Expenses .appreciation.

1982 AccomDli.shments
     In 1982, the Agency  obligated a total  of  53,738.500  of *hic;i  S3..710,200  was
in trie  Salaries  ana  Expenses  appropriation  and 328,300  was  in  trie Operations,
Research and Facilities  appropriation.   These resources provided for, among  other
activities, the scientific,  technical  and  administrative management of ORQ's  pro-
grams, the  coordination  and  integration of  its  research efforts, general  adminis-
trative and planning and budget support.

        MANAGEMENT - SOLID WASTE  AND EMERGENCY RESPONSE
19.64 Program Request

     The Agency  reouests  51,352,500  for Salaries  and Excesses sn.d  21.6  permanent
workyears, an increase of  1.1  permanent  workyears  and 3502,400.   This  Salaries  and
Expense increase  reflects  increased payroll  costs and  support  to  the  Office  of
Solid Waste and  Emergency  Response's (OSWER)  management information  systems.   The
request supports  the  development  and  implementation  of the  Hazardous  Waste  and
Superfund programs,  The  request  also  provides for the  review of policy  and  pro-
posed regulations  -for  conformity  to  law,  executive  orders,  and  Administrator's
guidance and to  monitor  program performance.   In  addition,  this  function is  sup-
ported by resources from the Hazardous  Substance  Response Trust Fund.

1983 Program

     In 1983, the  Agency  is  allocating 3850,100  for  Salaries and  Expenses  and  20,5
permanent workyears.   Expected  accomplishments   include:    implementation  of  an
overall OSWER management plan,  including measures  of  accountability  and  effective-
ness; integration of Hazardous Waste and Superfund  activities;  and the introduction
of new policies  designed  to  reduce regulatory burdens  without sacrificing protec-
tion to public health and the environment.

19S3 ExplanationofChangesfrom Budget Estimate

     The net increase of +3386,700 results  from the following actions:

     -Congressional Action.  (+$386,700)   EPA's application  of Congressional  action
to this activity resulted Tn the following  changes.

     (+5387,300)  This increase  includes +3387,200 of the  S10.5 million  Salaries
and Expenses add-on  which  supports  the 480  additional  permanent full-time  work-
years provided to the Agency.

     (-$500)  A general  reduction of -51,350,000  was made to Management and Support
activities and  was applied  proportionately  to al!  offices in  that media  in  the
Salaries and Expenses appropriation.

1982Accomp 1 i snments

     In 1982,  the  Agency  obligated $786,200 for Salaries  and  Expenses.   Major
emphasis was placed on  those  activities .which  attend  the  creation of any new office:
staffing, defining  goals  and objectives, and  determining  responsibilities.   Major
activities and  accomplishments included developing  management plans  to  implement
both the  Hazardous Waste  and  Superfund programs,  proposing  hazardous waste  land
disposal regulations, and publishing the National  Contingency Plan.
                                       MS-12

-------
  Agency
Management
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Sudget Estimate

                                Table of Contents


                                                                            Page

MANAGEMENT & SUPPORT

   AGENCY MANAGEMENT
       Office of trie Administrator/Executive Offices	  HS-14
          Immediate Office of the Administrator,,	  MS-21
          Regulatory Information Service Center	  MS-22
          Administrator's Representation Fund		,....,,,,.  MS-22
          Office of Executive Secretariat	•	  MS-23
          Office of Management Services....	  MS-23
          Science Advisory Soard	,	  MS-24
          Office of^ Legislation.,	  MS-25
          Office of International  Activities..	  MS-26
          Office of Civil Rights	  MS-27
          Office of Public Affairs		  MS-29
          Office of Federal  Activities	  MS-30
          Office of Administrative Law Judges	  MS-31
          Office of Intergovernmental Liaison	.,...,	  MS-32
          Office of Small & Disadvantage*! Business Utilization	  MS-32
          Office of Inspector General..	,	  MS-33
       Office of Policy 4 Resource Management....,	  MS-35
          Program Management - Policy 4  Resource Management.!'.	  MS-38
          Office of the Comptroller	  MS-38
          Program Integration Project	,	  MS-39
          Office of Policy Analysis	,	  MS-40
          Office of Standards and Regulations	  MS-41
          Office of Management Systems & Evaluation.,,...,	  MS-42
       Office of Legal  & Enforcement Counsel	  MS-44
          Program Management - Legal  & Enforcement Counsel	  MS-45
          General Counsel	>	,	  MS-46
          Regional  Counsel	,	,...  MS-47
       Office of Administration	,	  MS-49
          Program Management - Administration..,.,	.,...  MS-53
          Financial  Management - Headquarters	.		  MS-54
          Contracts & Grants Management	  HS-55
          Personnel  3 Organization Services	  MS-57
          Facilities S Management Services	  MS-58
          Information Systems & Services	,....,...  MS-60
                                       MS-13

-------
              AGENCY MANAGEMENT



Office of the Administrator/Executive  Offices


PROGRAM
Immediate Office of the
Administrator
Salaries & -Expenses
TOTAL
Regulatory Information
Service Center
Salaries 4 Expenses
TOTAL
Administrator's
Representation Fund
Salaries S Expenses
TOTAL
Office of Executive
Secretariat
Salaries & Expenses
TOTAL
Office of Management
Services
Salaries & Expenses
TOTAL
Science Advisory Board
Salaries & Expenses
TOTAL
Office of Legislation
Salaries & Expenses
TOTAL
Office of Legislation
Salaries & Expenses
TOTAL
Office of International
Activities
Salaries & Expenses
TOTAL
Office of Civil Rights
Salaries 4 Expenses
TOTAL
ACTUAL
1982
(DOLLARS
$2,299.7
$2,299.7
$363.5
$863.5
$2.4
$2.4


$526.1
5526.1
$1,292.9
$1,292.9

$1,086.1
$1,086.1
$1,106.8
$1,106.8
BUDGET
ESTIMATE
1983
CURRENT ESTIMATE INCREASE *
ESTIMATE 1984 DECREASE -
1983 1984 VS 1983
IN THOUSANDS)
$2,276.7
$2,276.7
$550.0
$550.0
$3.0
$3.0


$1,088.7
$1,088.7
$959.5
$959.5
$835.9
$835.9
$1,028.3
$1,028.3
$1,008.1
$1,008.1
$2,183.1
$2,183.1
$546.9
$546.9
$3.0
$3.0
$401.6
.5401. 6
$474.5
$474.5
$1,059.9
$1,059.9
SI, 720. 7
$1,720.7

$953.3
$953.3
$1,012.2
$1,012.2
$2,012.0
$2,012.0
$568.3
$568.3
$3.0
$3.0
$459.8
$459.8
$526.8
$526.8
$1,064.6
$1,064.6
$1,811.6-
$1,811.6

$1,035.8
$1,035.8
$1,094.6
$1,094.6
-$171. 1
-S171.1
$21.4
$21.4

$58.2
$58.2
$52.3
.$52.3
$4.7
$4.7
S90.9
$90.9

$82.5
$82.5
$82.4
$82.4
                  MS-14

-------
                                  AGENCY MANAGEMENT

                    )ff"ics of the Adnrim'strator/Exec'jt'ive Offices
                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1964 VS 1983
Civil Rights
Investigations
 Salaries & Expenses
                       TOTAL
Federal Women's Program
 Salaries 3 Expenses
Office of Public
Affairs
 Salaries & Expenses


Office of Federal
Activities
 Salaries & Expenses
Office of
Administrative
Law Judges
 Sal aries $> Expenses
Office of
Intergovernmental
Liai son
 Salaries & Expenses
Office of Regional
Liaison
 Salaries & Expenses
                       TOTAL
TOTAL
                       TOTAL
                       TOTAL
                       TOTAL
                       TOTAL
                                (DOLLARS IN THOUSANDS)
                     S154.3
                     5154.3
                      $10.7
                      S10.7
$1,527.3   SI, 421.1   51,297.3   51,393.1
SI,527.3   51,421.1   SI,297.3   51,393.1
        $1,406.2   51,189.1   51,268.7   SI,643.9
        51,406.2   $1,189.1   51,268,7   51,643.9
          $561.0
          $561.0
          $451.7
          $451.7
             5626.9
             5626.9
             S352.7
             S352.7
                     5109.5
                     5109.5
5645.0
$645.0
5556.4
5556.4
S701.8
5701.8
$532.2
$532.2
                      595.8
                      595.8
                                             S375.2
                                             S375.2
 $56.3
 $56.8
-:$24,2
-524.2
Office of Small &
Oisadvantaged Business
Utilization
 Salaries & Expenses
Office Of Inspector
General
 Salaries & Expenses
TOTAL:
 Salaries & Expenses

Office of the
Administrator/
Executive Offices
                       TOTAL
                       TOTAL
          $198.5
          $198.5
             $162.5
             -5162.5
5189.0
5189.0
$207.1
5207.1
       $11,530.2  $11,564.2  $11,956.5  $12,163.1
       511,530.2  $11,564.2  511,956.5  512,163.1

        22,852.4   23,341.2   24,268.1   25,217.7
TOTAL   22,852.4   23,341.2   24,268.1   25,217.7
 $18.1
 518.1
                                             S206.6
                                             $206.6

                                              949.6


                                              949.6
                                      MS-15

-------
                                  AGENCY MANAGEMENT

                    Office of the Administrator/Executive Offices

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

PERMANENT WORK YEARS
Immediate Office of the
Administrator
Regulatory Information
Service Center
Office .of Executive
Secretariat
Office of Management
Services
Science Advisory Board
Office of Legi slation
Office of Legislation
Office of International
Activities
Office of Civil Rights
Office of Publ ic
Affairs
Office of Federal
Activities
Office of
(DOLLARS IN THOUSANDS]

48.5 48.6
6.3 5.0


8.6 16.1
26.5 23.4
15.5
18.9 15.0
19.9 16.6
32.2 18,9
27.7 24.2
13.6 15.0
1

45.6
5.0
11.0
10.0
14.1
33.9

14.0
1
14.6
20.1
Z4.2
1.5.0


37.6 -8.0
5.0
11.0
10.0
14.1
31.9 -2.0

14.0
14.6
20.1
24.2
15.0
Administrative Law
Judges

Office of
Intergovernmental
Liaison

Office of Regional
Liaison

Office of Small &
Oisadvantaged Business
Utilization

Office Of Inspector
General

TOTAL PERMANENT WORKYEARS
  6.3
  4.6'
135.6
  4.9
             1.5
  3.1
8.4
4.1
6.4      -2,0
4.1
140.7      153.7      140.7     -13.0
348.7      348.5
           373.7
         348.7     -25.0
                                      MS-16

-------
                                  AGENCY MANAGEMENT
                    Office of the Administrator/Executive Offices
                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       19.83             1984 VS 1983

TOTAL WORK YEARS
Immediate Office of
the Administrator
Regulatory Information
Service Center
Office of Executive
Secretariat
Office of Management
Services
Science Advisory Board
Office of Legislation
Office of Legisl ation
Office of International
Activities
Office of Civil Rights
Office of Public
Affairs
Office of Federal
Activities
Office of
(DOLLARS IN THOUSANDS)

60. 8 59.3 49.3
7.4 5.0 5.0
15.8
14.2
12.0 25.9 23.9
35.4 31.0 44.6
19.4
27.7 23.0 22.0
27.6 23.8 21.3
35.9 24.3 25.5
34.3 30.3 29.3
13.6 15.5 15.6


41.3 -8.0
5.0
15.8
14.2
23.9
43.4 -1.2

22.0
21.8
25.5
29.3
15.6
Administrative Law
Judges
Office of
Intergovernmental
Liaison
Office of Regional
Liai son
Office Of Small &
Disadvantaged Business
Util ization
Office Of Inspector
General
TOTAL WORKYEARS
  9.1
  5.4
  7.1
             2.6
  3.9
11.7
 4.9
9.7
4.9
-2.0
156.8      170.7      183.7      170.7     -13.0
426.0
441-.9      467.3      443.1      -24.2
                                       MS-17

-------
                            MANAGEMENT AND SUPPORT


                               Agency Management

                Office of the Administrator/Executive Offices


Budget Request

     The Agency requests a  total of $25,217,700 for the Salaries and Expenses appro-
priation and  348.7  permanent  workyears   for  the Office  of  the  Administrator  in
1984.  This is an  increase  of S949,600 and a decrease  of  25.0 permanent  workyears
from 1983.  Workyear reductions occur primarily  in the  Office  of  Inspector  Genera]
and in  the Immediate  Office  of  the Administrator.   The  resources  will  support
stronger executive management in the  form of fiercer  policy  guidance, more  effective
relations with Congress, and better quality scientific advice for the entire  Agency,

Program Description

     This program  includes  the  salaries  and  associated  costs  for the  Immediate
Office of  the  Administrator,   the  staff  offices  which   report  directly  to  the
Administrator, and the  Office  of  Inspector General,  the latter of  which  comprises
48 percent of  total  office  resources.  The Administrator and  Deputy  Administrator
are responsible  for  providing  policy and  direction  to  the  Agency  and  ensuring
implementation of their policies;  the staff  offices provide  cross-cutting  Agency
guidance for  scientific  review of  regulations  and  research,  Congressional  and
intergovernmental liaison activities,  international  environmental  initiatives,  as
well as  civil  rights,  public  affairs,  administrative law hearings, and  audit and
investigative functions.

     Immediate Office of the Administrator --  This   office   includes:  the  Admini-
strator and  Deputy   Administrator,   specTal   assistants to  the  Administrator  in
the various program  areas,   a  Judicial  Officer,  speech writers,   clerical  support
staff, drivers and messengers.

     Regulatory Information Service Center -•• The  Center 1s  responsible  for tab-
ulating "aridcompilTrig1 nfonriati orf provided  by  other  Federal  agencies  concerning
their regulatory efforts.

     Administratpr's Representatlon Fund --  The  Fund  is  used  for  official  re-
ceptions , meetings,   afvS af f airshosted  primarily   by  the  Administrator   for  do-
mestic and foreign officials.

     Office of Executive Secretariat  — This  office  is  responsible for  handling,
processiirgy ~aridtracking aTT  oT  the Administrator's  correspondence,  Deputy  Ad-
ministrator's correspondence^  Congressional  correspondence,  and   Freedom  of  !n»-
formation  (FOI) correspondence.

     Office of Management Services -- This office provides centralized budget plan-
ning afui  implementation,  resource management,  personnel,  and administrative  sup-
port services to the Administrator and staff offices.

     Science Advisory Board ~  The  Board  consists   of a  Director,  professional
and clericalstaff,aBdapproximately   50  indeoendent  scientists and  engineers
who advise the Administrator  on the  scientific  and  technical  bases of the Agency's
decisions.  They  review the scientific   basis  of  regulatory  proposals,  the  ade-
quacy of  Agency  research  and  the  research  planning  process, the five-year  re-
search and development  plan,  as well as  special requests  from the Administrator,
the Deputy  Administrator and  the Congress.   The  SAB  prepares  findings   and  re-
commendations in technical  reports  which  are  Jegally  required to  be  sent  direct-
ly to the Administrator and  to the Congress.
                                       MS-18

-------
     0ffice of Legis]ation -- This office serves as the principal  point of Congres-
sional 'contact" for  the" Agency.   It provides summaries of  Congressional  activities
throughout I'-A and assists the Administrator and senior pc'icy officials if. develop-
ing pl'ans  for  trie  Agency's  legislative program.   The office  is  responsible  for
preparing draft legislation and testimony to the Congress.   In addition,  it reviews
all Congressional   correspondence,  responds  to  Congressional  requests  for informa-
tion and coordinates crar.t and contract announcements.

     Office of Internationa1  Activities -- This office  provides guidance and manage-
ment Torthe Agency's  fnTerriationalactivities  and programs  with  Western European
countries,  Japan,   Brazil,  and  the Caribbean nations,  in addition to  the Agency's
Scientific Activities Overseas  (SAO)  Program.   The office  also manages  agreements
with Canada and Mexico  on cross-boundary environmental issues and oversees  Agency
involvement in the activities  of  international  organizations  such  as  the  united
Nations Environmental Program,  the World Health Organization,  and  the  Organization
for Economic  Cooperation  and  Development  (OECD),   Finally,  the office plays  a
strong role in formulating and  implementing Agency policies that  affect  the inter-
national marine environment.

     0 f f i ce of C i vi 1 Rights --  This office  .iianage-s the Agency's  civil  rights  pro-
grams"It providespolicy  guidance  to the Administrator and  evaluates  activities
required to  carry  out  the Agency's  responsibilities  to  assure  equal  Opportunity
and prohibit  discrimination  in  employment  at  EPA.   This   program  also  supports
the area  Civil Rights  Directors  at  major research  and  field   installations  in
Cincinnati, Research Triangle Park, and Las Vegas, the activities of  the Agency's
Federal  Women's Program  Committee,  and  processing of  discrimination  complaints
lodged by Agency  employees and  applicants for employment.

     Office of Public Affairs —  This  office   develops  Agency  policy  for  media
relations and public information.  Its activities include:  preparing  press releases
and feature material  for media  distribution;  responding  to press inquiries;  con-
ducting press  conferences and  briefings;  coordinating  media  appearances of  key
Agency officials;   and   compiling  daily  and  weekly news  clips of  national  press
coverage.  In addition,  under the EPA  Peer and Administrative Review Control System,
the office reviews  all  public  information materials for conformance  to  policy  and
to the Agency's Graphics Standards System. •

     Q f f i ce of^F edera 1  Acti vi ti es —  This   office  develops  national   policies  for
deal ing with ehvi rarimentali s s~u e s and  problems  associated  with  Federal  agencies.
Specifically, the  Office  of Federal  Activities is  responsible  for  ensuring  that
EPA and  other  Federal   agencies  carry  out  their activities in an  environmentally
sound manner pursuant  to  the  National  Environmental  Policy Act  and Section  309
of the  Clean  Air  Act.   In this  capacity,  OFA  files  and  publishes  notices  of  all
Environmental  Impact  Statements.  Additionally,  in concert with  the  Army  Corps
of Engineers,   OFA manages the  Dredge and  Fill  program under  Section 404 of  the
Clean Water Act.   OFA  also  oversees  Federal  facilities  compliance  with environ-
mental requirements, and specifically with Executive Order 12088.

     Office .of Administrative Law Judges --  Judges from this  pffice  preside  over
and conduct hearings  required  By  tmT~Administrative Procedures Act  related  to
appeals of Agency regulations and decisions.

     Office of Intergovernmental  Liaison —  This   office  serves  as   the  Agency's
princTpal "penntJ6T "conTact"^-witi-T'lIJor national  public  interest  groups  and  State
and local  governments.   It  also  serve$ to  emphasize  the  Administrator's concern
with developing  cooperation  and  support  for  delegating  more responsibility  for
Agency programs to  State  and local governments.   To  these ends,   it  assists  State
and local  officials with  their  requests  for  information,   arranges  meetings  with
them,  and  encourages  State  and  local  involvement  in EPA's  regulatory  process.
                                       MS-19

-------
     Office of Small and 01 sadvantaged Bu s i nesjJJ tjj1 zation •- This office provides
Agency-wide oversight  TTi   iniplemeritingprograms  "underSections  8  and  15 of  the
Small Business Act  (as  amended)  to further tne  utilization  of  E.PA  procurement and
financial  assistance programs by  small and disadvantaged  businesses.   It develops
national policy  for EPA and  serves as  the  focal point  for  providing  guidance for
implementing the  Agency-wide  minority  and  women's   business  enterprise  policy
unfler grants and cooperative agreements.

     Of flee of I n s p ec tor 6 ene r a 1 --  This  office,  the  largest  single  component
of th£ Office  of the Administrator,  is  responsible for:  conducting,  supervising,
and coordinating  audits and  investigations  relating  to  EPA  programs  and  opera-
tions; promoting economy and  effectiveness  in the administration of  EPA programs;
preventing and detecting  fraud  and abuse  in  EPA programs and  operations;  Veeoing
the Administrator  and   Congress  fully  informed  about  problem  areas  and  related
corrective action; and reviewing EPA regulations  and legislation.
                                       MS-20

-------
IMMEDIATE OFFICE OF THE ADMINISTRATOR
           n' Reauest
     The Agency  requests  a  total of  52,012,000  and 37.6  permanent workyears  for
this program,  all  of  which  is for  the  Salaries  and Expenses appropriation.   This
represents a decrea.se of  5171,100 and 8,0 permanent workyears resulting  from  work
achieved with   1983  resources  for  developing  and  implementing  improvements  in
coordination of  EPA's  outreach  activities,  the  major focus of  activity in  1984
will be to  ensure  better internal management, continue  regulatory reform, pursue
delegation of  programs   to  States  and  local  governments,  and  support  enhanced
science as a basis for decision-making,

1983 Program

     In 1983,   the  Agency is  allocating  a total   of $2,183,100  and 45.6  permanent
workyears to this  office, all  of which  is  for  the Salaries and Expenses appro-
priation.  In   1933,  resources will  be  applied  to  improve  coordination  among  our
major outreach  staff  offices  and ensure  that EPA external  activities  reflect  the
overall interests  and  positions  of  the  Administrator,  as  well  as  to  improve
Agency communication  on  issues  with  major  outside organizations,  Congress,   and
public interest  groups.   Staff  resources  will also  be  devoted to  a  workforce plan-
ning initiative  to  provide  policy  guidance  and  support  to the  Administrator  in
evaluating reorganizations and  staffing  considerations.   The Agency  will  consider
alternatives for continuing  these activities  beyond  1983.

1983 Explanation of Changes  from Budget Estimate

     The net decrease of -593,600 results from  the following actions:

     -Reorganization.   (-5514,400)  The  Congressionally   approved reorganization
within the staff offices  created  the  Office  of  Management  Services which consoli-
dated the budget, financial  management,  planning,  and administrative services  func-
tions into one  office.   It  also  created  the Executive Secretariat,  which  because
of  the Administrator' s interest in improving  the effectiveness of the correspondence
tracking functions, consolidated  Freedom  of  Information,  Executive  Correspondence,
and Congressional Correspondence functions.

     -Congressional Actions.   (+$201,200)  EPA's application of Congressional action
to  this activity resulted in  the following changes:

     (+5203,400)  This increase  includes +5203,400 of the S10.5 million Salaries and
Expenses add-on  which  supports  the  480  additional   permanent  full-time  workyears
provided to the Agency.

     (-52,200)   A  general reduction  of  -51,350,000  was  made   to  Management  and
Support activities  and  was  applied proportionately  to all  offices  in that media
in  the Salaries and Expenses  appropriation.

     -Reprogrammings.   (+$219,600)  During the development  of the  operating  plan,
several reprogrammings  were  made to this activity  which  are not  reportable  under
the Congressional reprogramming  limitations.  These changes resulted   in  a  net in-
crease of +5219,600 to the Salaries  and Expenses  appropriation.

    JUxompHshnients
     in 1982, the  Agency  obligated  a total of 52,299,700  for  this program,  all  of
which was for the  Salaries  and Expenses appropriation.  The Immediate  Office  com-
pleted the consolidation  of  administrative,  resource,  personnel  and  correspondence
activities through a  reorganization  of functions and  the  creation  of  the  Offices
of Management Services and Executive Secretarial.  Work  was completed on the newly
operational  Executive Correspondence Tracking system.

-------
a£GULATORY INFORMATION .SERVICE CENTER
     The Regulatory  Information  Service  Center  .requests a  total  of  S.568,300  and
5.0 permanent workyears,  all  of which  is  for  the Salaries  and  Expenses  appropri-
ation.  This  is  an  increase  0*  321,^00 znaner-*  v/o^kyears.
The Center will publish  two  editions of the Unified Agenda  .of  Fecferal  Regulations
a:nd will maintain an automated data base of Federal Government regulatory activity.
The Center will also continue its monthly analysis of  Federal  Register -Statistics.

1983 Program

     The Regulatory  Information  Service Center  is allocating a total  of 5546,900
and 5.0 permanent workyears, all of  #'rvich is for  the  Salaries and  Expenses  appro-
priation.  The Center  produced  the  first Unified Agenda of  Federal  Regulations in
October 1932.  The second  edition  of the Unified Agenda  will be published in Apri]
1983.  The Center will also.place  into  operation .an  automated  data  base of Federal
regulatory activity,  as well as continue  its monthly analysis  of the  Federal  Regi-
ster's Statistics.

1983 Explanation of Changes from Budget Estimate

     The net decrease of -53,100 results from the following action:

     -Cpngressiona1Action.  (-53,100)   A  general  reduction  of  -31,350,000  was
made to Management  afieJ Support  activities  ana  was  applied  proportionately  to  all
offices in that media in the Salaries and Expenses appropriation.

1982 Accomplishments
     In 1982,  the  Agency obligated  a  total  of 5863,500  for this program,  all  of
which was  in the  Salaries  and  Expenses appropriation,   Th:e  Center  produced  the
final edition  of the  Calendar  of Federal Regulations,  developed a prototype of the
Unified Agenda of  Federal  Regulations,  and  performed the  development  work  for  the
automation of  Federal  regulatory  activity.   The  Center also instituted an analysis
of Federal Register Statistics, which was continually  refined  during the course of
the year.

ApMINISTRATOR'S REPRESENTATION FUND

1984 Program Request
     The Agency requests  a  total  of S3.,OQO for this program, all  of  which  is used
under the  Salaries  and Expenses appropriation.  This  reflects  no chance  from the
1983 level.

1983 Program
     In 1983, the  Agency  is  allocating a total  of 33,000 to this  program,  all  of
which is under the Salaries and Expenses appropriation.

1983 Explanation of Changes from Budget.; Estimate

     There is no change to this program.

1982 Accomplishments

     In 1982, the  Agency  obligated a  total  of S2.40Q for  this  function under the
Salaries and Expenses appropriation.
                                       MS-22

-------
OFFICE OF EXECUTIVE SECRETARIAT
19S4 Proqran Reauest
     The Agency  re-quests  a  total  of 545-9,300  and  11.0  permanent  workyears for this
prograrrt, all of  which  is  for  the  Salaries and Expenses appropriation.   This  repre-
sents an  increase  of  $53,200  and r.o  permanent  iwkyears  f^cm  1932  levels.   This
office will continue to manage  tne  Administrator's  correspondence,  Deputy Adfiiinis^
trator's correspondence,  Congressional  correspondence, and Freedom  of Information
(FOI) correspondence.

19-33 Program

     !n 1983, the Agency  is allocating ;«  total of $401,500 and 11.0 ?eraar>ent work-
years for this program, all  of which  is for the Salaries and Expenses appropriation.
Through the  newly  completed  Executive  Correspondence  Tracking  System,  the  office
will track ana monitor all incoming and outgoing Agency corresponaence.  The office
will prepare a yearly  report  to Congress  on the cost to the Agency and to the pub-
lic of adainistsring the  Freedom  of Infonnation Act.  A  reorganization  of activi-
ties, approved  by  the  Congress,   resulted  in  the   establishment  of  this  program
element beginning in 1983.

1933 E xpj .ainait jo n J3 f Chan ge sfrom Budget Estimate

     The net increase of +$401,600 results froro"th.e following actions:

     - Reorganization.  (+3335,100]   The  Congressionally  approved  reorganization
within the  staff offices  created  the Office of Management  Services  which consoli-
dated the budget, financial management, planning, and administrative services func-
tions into  one  office.   It also  created  the  Executive  Secretariat,  which because
of the Administrator's  interest in improving the  effectiveness of the correspondence
tracking functions,  consolidated  Freedom  of Infonnation,  Executive Correspondence,
and Congressional Correspondence  functions.

     -Congressional Action.   (-S300)  A  general  reduction  of -$1,350,000  was made
to Management ana Support activities ancf was applied proportionately to all offices
1n that media in the Salaries and Expenses appropriation.

     -Reprggraminings.  ( + 566,800)    During the development  of the  operating  plan,
several reprograramings  were  made  to this  activity  which ara not  reportable under
the Congressional  reprograwning limitations.  These   changes  resulted  in  a  net in-
crease of tS56,300 to  the Salaries and 'Expenses appropriation,

1982 AccompJ i shments

     No resources were  obligated  by this  office in  1982.  Activities and resources
supporting this  program  in  1982   were  performed in  the  Immediate  Office  of  the
Administrator, and the Office of Legislation.

OFFICE OF MANAGEMENT SERVICES

1984 Program Request

     The Agency  requests  a  total  of 5526,800 ana 10.0 permanent workyears,  all  of
which is  for the Salaries  and Expenses appropriation.   This represents an increase
of 552,300  and  no additional  permanent workyears  from  1983 levels.  This  office
will continue  to provi.de administrative,  personnel  management   and  budget support
to staff  offices in the  Office  of the  Administrator.   Activities will  focus  on
improving resource and  personnel  utilization  by  centralizing  financial  management
and automating personnel  records.
                                       MS-23

-------
1983 Program

     in 1383,  the  Agency  is allocating  a total  of S47s50C  and li.C  permanent
workyears for this  program,  :all  of which is for the Salaries  and Expenses  appropri-
ation.  The Office will  monitor  resource expenditures,  develop  planning  studies  to
save space and  lessen  resource  demands, provide uniform personnel  and  atiministra-
t-vs support services,  and  assist stcr"-f offices *ith recru' t-uent  ana  star" fine  anc
property control,   A  reorganization   of  activities,  approved  by  the   Congress,
resulted in the establishment of this  program  element beginning  in 1983.

1983 Explanation of Changes From Budget Estimate

     The net increase of +5474,500 results from the following actions:

     -Reprgan i za ti on,  ( + $330,000)   The  Congressionally  approved  reorganization
within~the staff offices  created  the  Office of Management Services  which consoli-
dated the budget, financial  management, planning,  and administrative services func-
tions into one  office.   It also  created tne  Executive   Secretariat, wnicn  oecause
of the Administrator's  interest  in  improving  the effectiveness  of  the  correspond-
ence tracking functions, consolidated  Freedom  of Information, Executive Correspond-
ence, and Congressional  Correspondence functions.

     -Congressional Action.   {-$300)  A  general  reduction  of -31,350,000 wa-s  made
to Managementand Support activities and was applied proportionately to all  offices
in that media in the Salaries and Expenses appropriation.

     -Reprogrammings.  ff$94,8QQ)   During  the  development of the  operating  plan,
several reprbgramrai rigs  were  made to this  activity  which are not  reportable under
the Congressional  reprpgramnting limitations.   These  changes  resulted in  a  net  in-
crease of +594,800 to the Salaries and Expenses appropriation.

1982 Accomplishments

     No resources were  obligated  by this office in 1982.  Activities and  resources
supporting this  program in  1982  were  performed  in  the  Immediate  Office  of  the
Administrator,  and the staff offices.

SCIENCE ADVISORY BOARD
1984 Program Request

     The Agency  requests  a total  of $1,064,500 and  14.1  permanent workyears  for
this office, all  of which  is  for the  Salaries  and  Expenses  appropriation,   this
reflects an  increase of  $4,700  and no permanent workyears  from  1983 levels.   This
increase will  be  used  to  expand  the  number of  meetings  held to  address  selected
issues.  The Deputy Administrator  will  identify 15-25 major  regulatory  issues  for
the Science Advisory Board to review in 1984..  This program will  enable the Admini-
strator and  the  Agency  to gain  greater credibility by  basing regulatory decisions
o.n scientific  and  technical  data  which has  been  reviewed by  the  Science  Advisory
Board (SAB).

1983 Proaram
     The Agency  is  allocating a  total  of 51,059,900 and  14.1  permanent  workyears
to this program, all  of  which is  for the Salaries and Expenses appropriation._  The
SAB will  be  involved  in  a  number  of reviews  during  .1983.    Included  among these
will be  High  Level   Radioactive  Waste  Disposal  Standards;  Site-specific  Water
Quality Criteria; Guidelines  for  Mutagenicity Risk Assessment; Maximum Contaminant
Levels for Volatile   Organic  Chemicals  in Drinking  Water;  Health Advisories  on
Aldicarb and  on Unregulated  Contaminants  in Drinking  Water; Effluent  Guidelines
for the Pesticide Industry; EPA's  Sludge Management  Guidelines;  proposed  revisions
                                       MS-24

-------
to the  Agency's  Secondary  Treatment  Regulations; Air  quality  criteria  documents
for lead and  ozone published under  Section  108, and  national  primary  and  secondary
ambient air quality  standards,  published under Section  10?  of  the Clean  Air  Act;
Critical Assessment Document for  Acidic  Deposition;  Health Risk Assessment  Metho-
dology  for Alternative National Ambient  Air Quality  Standards;  review of proposals
to reorganize EPA'.s  research  laboratories;  EPA's  Five  Year .Research  and  Develop-
ment Pl.an; and  review  of  Meclth  .Assessment  Documents  for  Hazardous  Pollutants.

1983 ExplanationofChanges from Budget Estimate

     The net decrease of -S28.800 results from the following actions:

     -Congrgssi onal Actions.  (+$1,200)  EPA's application  of Congressional  action
to this activity resulted in the following changes:

     (+$3,400)  This increase  includes +53,400 of the  S10.5 million  Salaries  and
Expenses add-on which  supports  the 480 additional  permanent  full-time  workyears
provided to the Agency.

     (-$2,200)  A  general   reduction  of  -SI,350,000 was  made   to Management  and
Support activities and  was  applied proportionately  to  all  offices  in that  media
in the Salaries and Expenses appropriation.

     -Reprogrammings.  (-$30,000)   During  the development  of  the operating  plan,
several reprogrammings  were made to this activity which  are not  reportable  under
the Congressional  reprograntming  limitations.   These  changes resulted  in a  net  de-
crease of -$30,000 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982, the  Agency obligated a  total  of $526,100  for this  program, all  of
which was  under  the Salaries  and  Expenses appropriation.   During  1982,  the  SAB
provided advice on  the  scientific  and .technical  aspects  of a  variety  of  environ-
mental issues.,  as  requested  by  the  Administrator  and  as  mandated  by  Congress.
Among the  issues  reviewed by  the Board  during  1982  were  the  following:  scientific
and technical bases  of  the  August  1982 proposed  regulations to control  the  use  of
lead in  gasoline;  the   proposed  Effluent  Guidelines  for  the  organic  chemicals
and plastics   and  .synthetic  fibers  industries;  multiple-exceedence approach  for a
carbon monoxide  national  ambient  air quality  standard;  draft Health  Assessment
Document for  Toluene;  Carcinogen Assessment  of  Coke Oven Emissions;  in  addition
to numerous other health assessment documents and issues(

OFFICE OF LEGISLATION
1984 Program Request

     The Agency  requests  a total  of $1,811,600 and  31.9 permanent  workyears  for
this office, all  of which  is  for the  Salaries  and Expenses  appropriation.   This
reflects an  increase  of 590,900  and a  decrease  of 2.0  permanent workyears  over
1983 levels.   During  1984, the  office  will  realize  efficiencies  in  dealing  with
Congressional and Agency requests  due to automation of  legislative  research  func-
tions.  The  budget  request will  enable ;the office  to  provide  day-to-day  liaison
with the Congress and will  ensure that legislation, testimony and reports on legis-
lation are provided to the Congress in a timely manner.

1983 Program

     The Agency  is  allocating  a total  of  51,720,700 and 3S..9  permanent workyears
to this office,  all  of  which  is for  the Salaries  and  Expenses appropriation.   The
Office of Legislation provides  leadership  and  support  for  specia1> working groups
established within  the  Agency  to draft  legislative  initiatives in' key  areas.   It
ensures that testimony,  drafting of legislation, and reports on pending and enacted
                                       MS-25

-------
legislation wi'l be performed  in  a timely fashion.  Special  attention  will  be de-
votee to  reauthori zation  of the Clean  Air,  Clean Water,  ana Safe Drinking  Water
contacts with Congress.   In  1983, this program  contains  the  resources  which previ-
ously supported both the Office of Legislation and Office of Congressional  Liaison.

19S2 Explanation O'f 'Chances fro*" Sudaet -estimate
     The net decrease of -374,700 results from the following actions:

     -Reorganization.  (-5123,100)   The  Congressional 1y  approved  reorganization
w'thin the sta'f  offices  created the Office of Management  Services  *hicn  consoli-
dated the Budget, financial management,  planning,  and administrative services func-
tions into one  office.   It also  created tne Executive  Secretariat,  which because
of the Administrator's interest  in improving  the effectiveness of the correspondence
tracking functions,  consolidated Freedom of Information., Executive Correspondence,
and Congressional Correspondence functions.

     -Congressional Action.  (-$1,700)  A general  reduction of -51,350,0.00  was made
to Management and SlJpportTactivi ties and was applied proportionately to all offices
in that .nedia in the Salaries and Expenses appropriation.

     -Reprggraffiini nos,  1+550,100)   During  the  development  of the  operating  plan,
several Fipro'g'ranirai ngs were  made to  this activity  which are not  reportable .unaer
the Congressional  reprogramming  limitations.   These  changes resulted  in a  net  in-
crease of ^$50,100 to the Salaries and Expenses appropriation.

1982 Accompli shments

     In 1982, the  Agency  obligated  a total   of 51,292,900  for this program,  all  of
which was for the Salaries and Expenses  appropriation.

     In 1981, the  Office  of Legislation  was separated  into  two  components  --  the
Office of Congressional  Liaison remained in the  Executive Offices and  the  Office
of Legislation was moved into the Office of Policy and Resource  Management.  During
the mid-year review,  it  became  apparent that closer  links  needed  to  be  maintained
'between the  analysis  and  tracking .of legislation  performed in the  Office of Legis-
lation, and  day-to-day liaison  with individual Congressmen and  committees as per-
formed in  the  Office of  Congressional  Liaison.   The  Administrator,  therefore,
approved a reorganization  on  September 5,   1982  which   consolidated  these offices
into one within  the  Executive  Offices.   The Office  of Legislation now consists  of
the Immediate Office  of  the Director,  the  Congressional Liaison  Division  and  the
Legislative Division.

     The former Office of  Congressional  Liaison  was  responsible for all  day-to-day
Congressional contacts.   The   former  Office  of  Legislation  reviewed  legislative
suggestions  from  the  program   offices   for  consistency   with the  Administrator's
overall goals and  policies and  recommended  to the Administrator  a package  of  le-
gislative amendments  to  be pursued  in  1983  and  1934.  In addition, the Office  of
Legislation handled   90  hearings and  associated  testimony,  and   submitted  seven
formal legislative proposals.

OFFICE OF INTERNATIONAL. ACTIVITIES      •;

19S4 Program Request

     The Agency  requests  a total of 31,035,300  and 14.0 permanent  workyears  for
this office,  all  of  which  is   for  the  Salaries  and  Expenses  appropriation.  This
reflects an  increase  of   582,500 and  .no  permanent  workyears  from  1983 levels.
Efforts will   be  directed   toward   the   implementation of  transboundary  pollution
control agreements with Canada  and  Mexico.   'The  office  will  take  further  steps to
                                       MS-26

-------
optimize the  Agency's  participation  in the  Organization  for Economic  Cooperation
and Development iOECD) and  United  Nations  related activities-.   Increased  emphasis
«-i1": se  pieces o^  gx-sti'.:  irilaterj";  scienti fic  agreements  with  West  Germany,
Japan,  .and China.

1983 Prpgran

     The Agency is allocating  a  total  of 5953,300 and  14.0  permanent  workyears to
this office, all  of  which is  for  the  Salaries and Expenses  appropriation.   Rela-
tions with  Canaoa will continue  to dominate  the  focus of OIA.   This  includes  con-
tinuing negotiations   on  a  transboundary  air  quality  agreement, a  joint plan  to
reduce  pnosp'norous levels  in tne  Great  Lakes, and cooperative efforts  to  remedy
the pollution  in the  .Niagara  River Basin.  Negotiations  are under way  with  Mexico
concerning a  new  border  agreement on  natural  resources and  the environment.   New
initiatives will be  taken in  support  of the President's  special  interest  in  bi-
lateral relations with Viest  Germany, Brazil,  Chins, and Caribbean nations.  Parti-
cipation in  international   organizations  is  highlighted  by  the  Administrator's
chairing cf  the U.S.  delegation  to the CECC'i second Hlgn-L.evel  meeting  on  chemi-
cals in November and  EPA's  chairing of  the  U.S.  delegation to  the meeting  of  the
London  Dumping Convention in February.

1963 Explanation of Changes froui Budget Estimate

     The net decrease of -375,000 results from the following actions:

     -Reojganjzation.   (-$25,900)  The  Congressionally approved reorganization with-
in the  s tTff  offices  created the Office of Management Services  which  consolidated
the budget,  financial  management,  planning,  and  administrative  services  functions
into one office.   It  also created the  Executive Secretariat, which  because  of the
Administrator's interest  in  improving the  effectiveness  of  the  correspondence
tracking functions, consolidated Freedom of  Information,  Executive  Correspondence,
and Congressional  Correspondence functions.

     -Congressiona 1 Action.  (-$1,900)    A  genera]  reduction  of  -$1,350,00.0  was
made toTk nag erne nt  and SUpport  activities and was applied  proportionately  to  all
offices in that media in the Salaries and Expenses appropriation.

     - R ep r oj r amm i n gs.   (-547,200)  During  the development  of the operating plan,
several rep'rdgraiSitiings were  made  to this activity  which are not  reportable under
the Congressional  reprogramming  limitations.    These  changes resulted in  a net  de-
crease  of -547,200 to the Salaries and  Expenses appropriation.

1982 Accomolishments
     In 1982,  the Agency  obligated  a total of $1,086,100  for  this  program,  all  of
which was for the Salaries and Expenses appropriation.   Internationally, acid de-
position received widespread attention through additional negotiations with Canada,
EPA leadership of both  the U.S.  delegation  to the  Stockholm Conference on Acidifi-
cation of the  Environment, and the  US and  Dutch  MOx  Symposium.   The Administrator
co-chaired the  U.S.  delegation  to   the  tenth anniversary  meeting  in  Nairobi  of
the United Nations  Environment program.   The  Administrator also hosted  the  fifth
meeting of the US and  Japan  environment-al  coordination  committee and held discus-
sions in Mexico City with EPA's counterpart organization.  EPA continued its active
participation in the OECO Environment Committee  and  its subsidiary expert groups.

OFFICE OF CIVIL RIGHTS

1934 Program Request

     The Agency  requests  a total of $1,094,600  and  14.6 permanent  workyears  for
this office,  all of  which is  for the Salaries and Expenses appropriation.  This is
an increase  of 582,400  and no permanent workyears  from  1983  levels.  The increase
                                       MS-27

-------
will be  used  to continue  to  neet tine  Agency's  goal  of  zero inventory  growtn  in
Equal Ens! oyroent  Opportunity   (££0)  complaints;   iaD'emsft  the  Agency'-s  clan  for
-is topical ly 2">ack Colleges anc ur.iversi ties ;  continue  t^A's  nego.ti an ons wilr. tne
Department of Laoor to eliminate the  backlog of complaints filed  under the Contract
Work Hours  and  Standards  Ac.t;  and to  develop a  strategy  to assist  the Regional
Offices in eliminating the DuilduE of  cases  filed  under Section  50^  of the Rehaoi-


1283 Program
     The Agency  is  allocating  a  total _,of SI,012,200  and  K.:6  permanent workyears,
all of wmcn  is  for tne  Salaries anc Expenses appropriation.   Tne  Office  of Civil
Sights is:  arranging an  ££0  Officers  Planning .Convenes;  providing  assistance
to EPA program offices in  developing tne  Agency's  plan  for suoocrt to Historically
Slack Colleges and Universities;  publishing, as a final  rule,  the consolidated non-
d'iscrimi nation regulation  directed  toward  recipients of  Agency financial  assis-
tance; irapl ementina  a more  effective Headquarters  ££0 counseling .orograrn;  develop*
109 an Agency-wiae   Affirmative  Action  Plan  in  accordance  with  Equal  Employment
Opportunity Commission  requirements  arid  monitoring  tne  Agency's  comollance  with
affirmative action  goals;  and  continuing  its efforts to  achieve  the  Agency's  goal
of zero inventory growth  in EEC  complaints.   In 1983, -with  approval  from  the  Con-
gress, the Federal  Women's Program  and Civil  Rights  Investigations activities  are
now included in this component.

1983 Explanation of Cha.ngesfrow Budget Estimate

     The net decrease of -$160,900 results from the following actions:

     -_R_eoj*ga_nizatJon.    (-$31,700)    The  Congressionally approved  reorganization
wi thin the  staff  oFTices  created the Office of Management Services which  consoli*
dated the  budget, financial management,  planning,  and administrative services func-
tions into  one  office,   it  also  created  the Executive Secretariat,  which because
of the Administrator's interest in improving  the effectiveness of the correspondence
tracking functions,  consolidated Freedom  of Information,  Executive Correspondence,
a.nd Congressional Correspondence functions.

     -Congressional  Action.  {-$2,400)   A general  reduction of -51,350,000 was made
to Management aHc! Support activities and was applied proportionately to all offices
in that media in the Salaries  and-Expenses appropriation.

     -Reprogramaings.  (-5126,8005  During  the development of  the  operating plan,
severaTTepTogrammings were made to this activity  which   are  not  reportable under
the Congressional reprogramming  limitations.   These changes resulted  in a net de-
crease of -5126,800  to the Salaries and Expenses appropriation.

1982 Accomplishments
     In 1982,  the  Agency  obligated a total  of  31,038,300  for this program,  all of
which was in the Salaries and Expenses -appropriation.  The Congressionally approved
restructuring consolidated  program  elements  with  related   functions  within  the
Office of Civil  Rights  into  one element to  promote  greater  efficiency  in resource
management.  It  moved  the  Federal  Women's Program  and  Civil  Rignts Investigations
into a program element entitled Office of Civil Rights.

     In addition,  the  functions of  this office  were  realigned  during  the  Latter
part of 1982 to  strengthen and  improve  the administration  and cost-effectiveness
of the  discrimination   complaints  process.   This  realignment  and  the   subsequent
iraprovenent of the  £EO  counseling  program have resulted in .a 4.8 percent reduction
in the number of EEO complaints filed.
                                       MS-28

-------
     The office provided assistance to EPA orogratn  offices  In  deveiooing  the Agen-
cy's Dlan for  suoport to Historically Slack  Co11.eges  3r,d  Universities,  develooed
d.n Agencywioe Affirmative Action  Plan,  anc  isomtcrec trie Agency's  compliance' witr,
affirmative action  goals.   The  Headquarters  Special  EiTohasis  program  sponsored
cultural awareness activities for  Slack  History  Month  and Hispanic Heritage  Week.
Managerial  and  suoervi-sory  woricshoos  were held  during  National  .Secretaries'  wee.k
anc «Qarv-
ment of  Justice  on the  Agency's  consolidated non-discrimination  regulation.   The
regulation was placed in the  Agency's forr.al  rsviev.' process  at th-e end of 19S2.   A
plan has been developed  to  assist in  its implementation.  A National  ££0 Officers
Planning Conference was  held  with the Department  of Justice  and  EPA  participants
to familiarize them  with the  regulation and  its impact  at the Regional  and  State
1 evels.

OFFICE OF PUBLIC AFFAIRS

1984 Program Request

     The Agency  requests a  total  of 31,393,100 and  20.1  workyears for  this office,
all of which  is  for  the  Salaries  and  Expenses appropriation.   This reflects an in-
crease of $95,300 and no permanent workyears from 1983  levels.   In 1984, the Office
of Public Affairs  will  continue  to inform the public  of Agency activities  and  to
promote better understanding of the Administrator's objectives  and goals as well  as
the Agency's mission.

1983Program

     The Agency  is  allocating a  total  of $1,297,300 and 20.1 workyears  for this
office, all   of which  is  for the Salaries and Expenses appropriation.   In addition
to its primary responsibilities of working with  the news  media as  well as conduct-
ing other public  information  activities, the  Office  of  Public Affairs will:   (1)
produce a biweekly external newsletter  which will  communicate the Administrator's
goals.and actions  to  the public;  (2)  produce a  biweekly  internal  newsletter which
will keep employees  informed  and  aware  of  Agency  activities  and  actions as they
affect EPA's  mission  and  its  employees;  and (3)  handle  an  expanding  community
relations program shared with the Superfund  program.

1983 Explanation of Changes from Budget Estimate

     The net decrease of -5123,800 results from  the following actions;

     -Congressional Action.   {+337,700)  EPA's application  of  Congressional  action
to this""actfvity ;resu 1 tedTn the  following changes:

     (+540,700!  This increase  includeS'-*-$4Q,700 of the  $10,5  million  Salaries and
Expenses add-on  which supports  the  480 additional  permanent  full-time  workyears
provided to  the Agency.

     {-S3,000)  A  general   reduction  of  -31,350,000 was made  to Management  and
Support activities and  was  applied proportionately to  all  offices in that media
in the Salaries and Expenses appropriation.

     -Reprogramraings.  (-3161,500)  During  the  development of the operating plan,
several reprogramtnings wera made to this activity  which are  not  reportable under
the Congressional  reprogramrning  limitations.   These changes resulted  in  a net de-
crease of -5161,500 to the  Salaries and Expenses  appropriation.
                                       MS-29

-------
1982 Accomo!isnments
which was for the  Salaries  and  Expenses appropriation.   In addition to its regular
duties, the office  assisted  in  tne production of  an  annual  Administrator's Sepcrt
to the President; published a new  booklet  as a guide to the Agency and its activi-
ties: ' rr",':5-tsi  *.  r,z*~z  coTC""ehenj5ve  dc"'~y  •"!•?»•:  5""i£*s  ?UD" iccC".Of  fc"~ t"j? U-SE c"
top Agency  officials;  developed  s  four-page aiweekly  newsletter  for  employees;
ip.pl ementec the  Agency's  Peer  Review  and  Administrative  Control  System;  and
directed an Acencywide  p'jM icstion review  to e'irainete unnecessary  Ag?.ncy puDli-
Cations.

OF F ICE	OF _F E.O £ RAl	AC TIV1TIE S

1954P r og ram R ecues t

     The Agency  requests  a total  of 31,643,900  and  24.2  permanent  workyears for
this office,  a1!  of  rfrn.ch  is  for the  SaJa-'es  s-od  Expenses  appro?.""'a't'e.i.   This
represents an  increase   of  5375,290  and  no permanent  workyeers.   This   reflects
increased automated  data  processing  support  for  the Federal  Facility Information
System (previously  funded by  the  Office  of  Legal   and  Enforcement  Counsel!  and
office equipment purchases.   The Office  of  Federal  Activities  (:OFA) anticipates
that it will  continue to prepare and review the  necessary environmental   documents
for compliance with  the  National  Environmental  Policy Act  (N£PA),  such .as  Environ-
mental Impact Statements  {EISs),  review other Federal   agencies'  projects and ac-
tions including  their EISs, direct activities to assure compliance .by  ether Federal
agencies with all  environmental  statutes pursuant to Executive Order  12083, review
the budget plans of other agencies to assure adequate funding of abatement  projects
pursuant to the  Office  of  Management  and  Budget Circular  A-106 and  manage the
Dredge and Fill   program.

1983 Program

     In 1933,  the  Agency  is al locating  .SI ,268,700 and 24.2 permanent  workyears for
this office,  ail  of  which  is  for  the   Salaries  and Expenses  appropriation.   The
Office of  Federal  Activities  develops  guidance  and  directs  imolementation of EPA
policies associated with  other  Federal  agencies;   it  anticipates increasing liaison
activities with  these agencies.  OTA  plans to  continue working en  regulatory reform
initiatives, particularly streamlining of procedural  requirements of  the Dredge and
Fill and NEPA programs.  In .addition,  the  office continues  to  review and prepare
EISs, review  other Federal  actions,  and  direct  activities  pursuant to  Executive
Order 12088 and  Office  of Management and  Budget  Circular  A-106  related to compli-
ance of  Federal  installations  with  environmental  regulations.   Emphasis  will  be
placed'on  the  cleanup  of hazardous  waste  sites  owned  or  operate.d  by the Federal
Government.

1933 Explanation of ^hangej^frgrn^ijdget Estimate

     The net increase of -^379,600 results from the following actions:

     -Reorganization.   (-520,000)  The Congressionally approved reorganization with-
in the s ta f f  o f f ices  created  the Office of  Management  Services  which consolidated
the budget,  financial  management,  planning,   and  administrative  services  functions
into one office.   It  also created the  Executive  Secretariat,  which  because of the
Administrator's  interest  in  improving   the   effectiveness   of   the   correspondence
tracking functions, consolidated  Freedom of  Information, executive Correspondence,
and Congressional Correspondence functions.

     -Congressional Action.  (-51,900)   A   general  reduction of   -$1,350,000  was
made to  ManagementandSupport  activities and was  applied proportionately to all
offices in that  media in the Salaries and Expenses appropriation.
                                       MS-30

-------
     -aeprogramnn'ngs.  (+$101,500)  During  the  development of the  operating  plan,
several' rep rogramni Trigs were  made  to this activity  which  are not  reportable  under
tn-e Congressional reprogramming limitations.  These changes resulted in a  net  in-
crease of -"•$101,500 to the Salaries and Expenses appropriation.

1982 Accormlishments

     In 1982, the Agency  obligated a  total  of  51,406,200  for this  program,  all  of
which was  for the  Salaries  and  Expenses  aopropriation.   The  Office  of  Federal
Activities (OFA)  focused  its  activity  on regulatory  reform within  the Dredge  and
Fill program  and  o.n  development and implementation  of Agency policies and  guidance
associated with  other  Federal  agencies.   Specifically,  OFA reviewed 54  Environ-
mental Impact  Statements  (EISs)  and  ISO proposed  rules  and regulations  pursuant
to  the National  Environmental  Policy  Act and  Section 309 of  the  Clean  Air  Act.
OFA continued  to direct  activities to  assure   compliance  of  Federal   facilities
with all  environmental  mandates.

OFFICE OF ADMINISTRATIVELAW  JUDGES

1984 Program Request

     The Agency  requests  a total  of $701,800  and 1.5..0 permanent  workyears  for this
office, ail of which is for the Salaries and Expenses  appropriation.  This  reflects
an  increase  of $56,800 and no  permanent  workyears from 1983 levels.  In  1984,  this
office will  continue to preside over and  conduct hearings  required  by  the  Adminis-
trative Procedures  Act related  to enforcement  actions  initiated  by  the  Agency.
Preliminary estimates  indicate a  significant  number  of  new  Section  120,  Clean
Air Act, and Resource Conservation and Recovery  Act cases in 1984.  The  Administra-
tive Law Judges  will also continue to adjudicate civil  rights  cases  investigated
by  the Office of Civil  Rights.,

1983 .Program

     The Agency  is   allocating  a   total  of  S645.0QO  and  15.0 permanent  workyears
to  tnis program,  all  of  which  is for  the  Salaries and  Expenses  appropriation.
The total  number o.f  cases expected from  EPA Regional  Offices in 1983 is  276 cases.
This represents  114  more  cases than  1982,  or  an increase  in  case  workload  of 57
percent.   In  addition,  the  office will   handle cases  originating  at  Headquarters
including  suspensions,   cancellations,  Section  3(cHl)(D)  of the Federal  Insecti-
cide, Fungicide,  and Rodenticide  Act  and Clean  Air  Act  cases,  and Civil  Rights
cases.

1983 Explanationof Changesfrom Budget Estimate

     The net  increase of +$18,100  results from the following actions:

     -C o n gre ssiona 1 Action.  (-$100)  A  general reduction  of -$1,350,000  was made
to Management and Support "activities and was applied proportionately to  all offices
in  that media in the Salaries and Expenses appropriation.

     -Reprogrammings.  (+$18,200)   During th.e  development  of  the  operating  plan,
several reprogrammings  were  ..made  to this activity  which are not reportable under
the Congressional reprogramming  limitations.  These changes resulted in a net  in-
crease of +$18,200 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982,  the Agency  obligated  a  total  of $561,000  for this program,  all  of
which was  for the  Salaries   and   Expenses  appropriation.   For  1982,  this  office
maintained a  docket  of 217  cases, most  of which  required  only a  small  time  in-
vestment, while  a  relative  few constituted  the majority  of the  judges'  workload.
                                       MS-31

-------
For Instance, one -case  -  Applications to use Sodium f"uoroacetate  'Compound 1030)
to Control Predators  -  necessitated the full time  service  of  one  Judge  involving
^- days  o^  h9£**inos.   Th^s case  or"icir>£t.c^  ci  Cece™^'"  22.  V5.81.  3".c ar-  *""i't"'sl
decision was issues  on  Octooer 22,  1982.  During  the  year, 61  cases  were  settled
oy Consent Agreement  and rinal  Order.   Seventeen  initial  decisions  were  issued.
Through a realignment of  Civil Rights functions,  this  office  was  given  responsi-
bility fo*° adjudicatinc C'vil  Ric'nts cases.

OFFICE OF INTERGOVERNMENTAL LIAISON

1984 Program Reouest

     The Agency  requests  a  "total  of 5532,200  and  5.4 permanent  work-years  for
this o^ice,  all  of w^ich  is  for  the  Salaries  arc Expenses  appropriation.   This
represents a decrease  of  $24,200  and  2.0  permanent workyears from  1983  levels.
In 1984,   the  office expects  to  continue to  ennance  its program of  comraunication
and liaison  with State  and local  elected  officials  and  najor intergovernmental
constituency organizations  (LCDs).   In  addition  to  trese ongoin; j-esccns'if! i ties,
the office expects  to develop  an environmental  law handbook  and to conduct  an en-
vironmental  seminar for  State  legislators and other elected officials.  The  office
also expects to expand its program of liaison with business groups.

1983 Program

     In 1983, the Agency  is  allocating  a total  of $£56,400  and 9.4  permanent work-
years, all of  which "is  for the  Salaries and 'Expenses  appropriation.   The  current
program includes activities which support one of the Administrator's primary goals,
to pursue delegation  of  EPA programs to  State  and local governments.  The  office
will improve comnunication with  elected State   and  local  officials  by  completing
the installation of  an  automated mailing system; naintaining  regular  contact  with
intergovernmental constituent  organizations;  representing  the Agency  at  meetings
conducted by ICO environmental committees  and assisting  in the  development  of ICO
enyi ronnental policy  statements;   developing  an  Agency  policy  on the  --eview  of 'CO
contract and grant  requests to  ensure  relevant and cost-effective  work  products;
participating in Agencywide  workgroups  on EPA  policy  management  issues;  communi-
cating on a regular and  frequent basis with  elected  State and local  officials; and
providing advice on State and local concerns to senior Agency  officials.

1983 Explanation of Chances from Bydaet Estimate
     The net increase of +$94,200 results from the following actions:

     -Congressional Action.  (+567,000)  EPA's application  of  Congressional  action
to this activity resulted in the following changes:

     (+567,800)  This increase  includes  +567,300  of the S10.5  million Salaries and
Expenses add-on  which  supports  the 480 additional  permanent   full-time  workyears
provided to the Agency.

     {-$800!  A  general  reduction  of  -Si,350,000  was  made  to  Management  and
Support activities  and  was applied  proportionately  to  all  offices  in  that media
in the Salaries and Expenses appropriation.

     -rteorogramrninQs.   ( + 327,200)   During  the development  of   the  operating plan,
several reprogramraings  were  made to this  activity  which are  not  reportable under
the Congressional  reprogramming  limitations.   These changes resulted  in  a net in-
crease of +527,200 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982,  the  Agency obligated  a  total  of v 54.51,700 for  this  program,  all  of
which was in the Salaries ana Expenses appropriation.  During  1982, the office com-
pleted an internal  reorganization,  finalized details of a cost-effective computer
                                        .'
-------
ized mailing  system,  established and  improved  working relationships with  fifteen
intergovernmental constituency  organizations,  attended  and/or addressed  numerous
meetings of ICO environmental committees, began £  series  of informal  meetings  witr,
various business  groups,  and communicated on a daily  basis with  numerous  elected
State and  local  officials.   The Congressionally approved  shift of  resources  from
the former  Office of Regional  Liaison  to  the Office  of  Intergovernmental  Liaison
reflected  the  Administrator's  decision to support  an  increased emphasis  on  dele-
gation of EPA programs to the States.

OFFICE OF SWLL AMDJH^

1984Program Request

     The Agency  requests  a total  of  $207,100  and  4.1  permanent  workyears  for
this office,  all  of which  is  for the  Salaries  and Expenses  appropriation.   This
represents an  increase of 518,100 and  no permanent workyears from 1983 levels.  In
1984, the Office will continue to comply with the Presidential directive to increase
our level  of  preferential  contracting  efforts and to  initiate  a  program  to assure
reasonable minority  business participation  in  procurement  under assistance  pro-
grams.  Guidance,  training   and  technical  assistance  will   be provided  to  Agency
program and Regional Offices as well  as to grant  recipients and  minority business
contractors.

1983 Program

     The Agency  is allocating  a total  of  $189,000  and  4.1   permanent  workyears
for this program, all of which  is  for the Salaries and Expenses appropriation.  In
1983, the  office  will  comply with  the Presidential  directive  to  assure  increased
minority business participation in contracting under  grants and cooperative agree-
ments.  Extensive  assistance to program  and Regional  Offices, grant  recipients,
and minority contractors is anticipated.

1983 Exp 1 ana ti on of Changes  from BudgetEstimate

     The net increase of +526,500 results from the following actions:

     -Congressional Action.  (-S100)  A  general  reduction of  -51,350,000  was  made
to Management  andSupport  activities  and  was   applied  proportionately  to  all
offices 1n that media in the Salaries and Expenses appropriation.                  /

     -Reprogramnvings.    (+526,600)  During the development  of  the operating plan,
several reprogramraings were  made to this activity  which are  not  reportable  under
the Congressional  reprogramming limitations.   These  changes   resulted   in  a  net
increase of +$26,600 to  the Salaries and Expenses appropriation.


1982 Accomplishments

     In 1982,  the Agency obligated  a  total  of $198,500  for this program, all  of
which was  for  the Salaries  and  Expenses appropriation.  The Agency  awarded $261.8
million in  direct procurement  contracts which  were  subject  to  our preferential
contracting efforts.  This  total  exceeded the Agency's  Small   Business prime  con-
tracting goal  by  6.5 percent and met  or exceeded  its  goals  for  Women's Business
Enterprise and Section 8(a) contracting.

OFFICE OF INSPECTOR GENERAL

1984 Program Request

     The Agency requests  a  total  of 512,163,100, and 140.7  permanent workyears for
this office,  all  of which  is  for the  Salaries  and Expenses  appropriation.   This
reflects an Increase of  $206,600 and a  decrease  of 13.0 permanent  workyears  from
                                       MS-33

-------
1983 levels.  The  reduction  in workyears  results  from progress we expect  to  make
with 1983 resources  in  reducing the  backlog  of construction grant final  audits  as
well as  from  efficiencies   achieved  through  the   revised  auditing  process.    In
1984, eliminating the remainder of  the  backlog of  construction grant  final  audits
will remain  the  first priority for  the Office of  Inspector  General.  The  office
plans to  conduct  investigations  of  fraud  against the  Government,   particularly
of contractor bid- rigging.   In addition,  the Office of Inspector Senersl  will  be
involved in  suspension  and  debarroent activities  in  those  cases where  firms  or
individuals have been indicted and convicted.  The Office of  Inspector General  has
ongoing responsibility  for  audits and  investigations  of the  Agency   programs  and
operations which include  audits  of  grants  and contracts,  internal and management
reviews, investigations   of   illegal  activities and  misconduct of  EPA  employees,
grantees and contractors.

1983 P nog ram

     In 1983, the, Agency  is  allocating^ total of 511,956,500  and  153.7  permanent
workyears to thfs office, all  of which "is  for  the  Salaries  and Expenses appropria-
tion.  Contract  resources are  used for  auditing services provided by  other Federal
agencies and CPA firms.   Although  the  Office  of  Inspector  General  has  continuing
responsibility for  conducting  pre»award,   interim,  and  final  audits   an.d  investi-
gations of  EPA programs  and  operations, it  has identified  its first  priority  for
1983. as  that  of implementing  the  revised audit procedures to expedite  closeouts
and eliminate backlogs of construction  grant projects.   In  addition,  auditors  will
concentrate on 1) identification of unliquidated obligations for inactive  construc-
tion grants, 2)  Regional  and  State  management of  the construction  grant  program
under Section 205(g) delegation,  and 3) reviews of weaknesses  on  internal  controls
disclosed by  Ageacy  vulnerability  assessments.   Continued  efforts   to  encourage
use of  the  Office  of Inspector  General  hotline  will  uncover  Instances  of  sus-
pected fraud, waste,  and mismanagement.   Investigative efforts  will   be  directed
to hlgh^potential  cases  in  the  areas  of  antitrust  violations,  contract  fraud,
travel, and time and attendance violations.

1983 Explanation of
     The net increase of +$392,300 results from the following actions:

     -C. ongressi'onal Ac ti on.  (+5392,300)  EPA's application of Congressional  action
to this"' activity resulted in the following changes:

     (+$440,600)  This increase includes +S440.6QO of the $10. 5 million Salaries and
Expenses add-on  which  supports  the  430  additional  permanent full-time  workyears
provided to the Agency.

     (-$48,300)  A  general  reduction  of  -51,350,000  was made  to Management and
Support activities  and  was applied  proportionately  to all  offices  in that  media
in the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982, the Agency obligated a total  of  $11,530,200  for this program,  all  of
which was  for  the  Salaries and Expenses  appropriation.   The Office  of  Inspector
General Issued  1,651  audit reports  questioning  $508 million  of the  $4.8  billion
audited.   During  1982,  the Office  of  Inspector  General   opened  140  new  investi-
gations and closed  76 cases,  which resulted in seven  indictments  and  convictions.
The office  completed the  initial  phase  of  coordinating  vulnerability  assessment
for all  Agency  programs  and   began  work  to  reduce  the  backlog  of  construction
grant projects  awaiting final  audit.   To eliminate  this  backlog,  the  Office  of
Inspector General  revised  its  audit  approach to discontinue  broad-scope  audits  1n
favor of limited  scope  audi.ts  directed at large construction  grants,  and  specifi-
cally the areas most  vulnerable to waste and abuse within those grants.
                                      MS-34

-------
                                  AGENCY MANAGEMENT

                        Office of Policy j Resource Management

                            -    ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE*
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE  -
                        ' •'  .       --.      1983       1983             1984 VS  1983

                                (DOLLARS IN THOUSANDS)
 PROGRAM
Program Management -
Policy 8 Resource
Management                 -   *,
 Salaries  4 Expenses             $905.7     $724.0   $1,052.4
                       TOTAL     1905.7     $724.0   $1,052.4
Office  of the
Comptroller
 Salaries 1 Expenses
 Operations, Research S
 Facilities
        $2,485.3   $2,063.5   $2,399.6
           $81.7

TOTAL   $2,567.0   $2,063.5   $2.399.6
Program  Integration     -  -
Project              , , •
 Salaries & Expenses           $2,388.7   $3,667.0   $3,516.2
               »        TOTAL   $2,388.7   $3,667.0   $3,516.2
       j>      '   ~

Office of Policy     .  '   '^ r  \\  ?v   ,
Analysis         '   //,   "      *      ""*          -    '
 Salaries I Expenses           $8,098.1   $8,433.0   $8,362.8
                     - TOTAL   $8,098.1   $8,433,0   $8,362.8

Office of Standards 4       v '   -      '         '    <
Regulations          i       *
 Salaries 4 Expenses*          $3,683.9   $3,574.0   $3,844.9
                       TOTAL   $3,683.9 .  $3,574.0   $3,844.9
Office of Managenent
Systems & Evaluation
 Salaries £ Expenses           $1,995.7    $2,155.1   52,185.0
                -    .  TOTAL    $1,995.7    $2,155.1   $2,185.0
                                           $950.9
                                           $950.9
                                                               $2,227.8


                                                               $2,227,8
                                         $3,341.6
                                         $3,341.6
                                         $8,070.9
                                         $8,070.9
                                         $4,020.2
                                         $4,020.2
                                                                $2,250.1
                                                                $2,250.1
TOTAL:
 Salaries 4 Expenses
                                                                          -$101.5
                                                                          -$101.5
-$171.8


-SI 71.8
                                                                          -S174.6
                                                                          -S174.6
                                                                          -S291.9
                                                                          -$291.9
                                                                           $175.3
                                                                           $17.5.3
                                                      $65.1
                                                      $65.1
        19,557.4   20,616.6   21,360.9   20,861.5    -499.4
 Operations, Research 4 I1-'-,  "- -  81.7 ,  ,     *  t~.-,
facilities   -s ;v^ -A f;t \;\  .   -»*',5   . '•*'       *•

 Office of Policy    „- TOTAL  $19,639.1/20,616.6   21,360.9   20,861.5    -499.4
 and Resource
Management
        •V
                                      MS-35

-------
           AGENCY MANAGEMENT

Office of Policy and Resource Management

         ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
          1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                    1983       1983             1984 VS 1983

PERMANENT WORK YEARS
Program Management -
Pol icy & Resource
Management
Office of the
Comptroller
Program Integration
Project
Office of Policy
Analysis
Office of Standards &
Regulations
Office of Management
Systems & Evaluation
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Program Management -
Policy & Resource
Management
Office of the
Comptroller
Program Integration
Project
Office of Policy
Analysis
Office of Standards 4
Regulations
Office of Management
Systems & Evaluation
TOTAL WORKYEARS
(DOLLARS II

11.7
46.5
6.6
36.2
27.2
32.1
160.3

14.8
59.4
10.5
57.2
53.7
44.6
240.2
N THOUSANDS

14.0
45.0
21.0
32.1
29.3
36.2
177.6

19.1
56.7
21.0
55.3
53.5
47.1
252.7
)

21.0
56.0
17.7
31.8
40.0
37.1
203.6

25.5
67.7
17.7
55.0
64.2
48.0
278. 1


16.0
45.0
12.0
31.1
40.0
37.1
181.2

21.1
58,7
14.0
54.3
66.5
48.0
262.6


-5.0
-11.0
-5.7
-.7'


-22.4

-4.4
-9.0
-3.7
-.7
2.3

-15.5
               MS-36

-------
                               MANAGEMENT AND SUPPORT


                                * Agency Management

                      Office of Policy and Resource Management
 Budget Request
     The  Agency  requests  a total  of 520,861,500 and  181.2  permanent workyears for
 198*.  a  decrease of  $499,400 and  22.4  permanent workyears  from  1983.   Uorkyear
 reductions  occur primarily In the Office of the Comptroller,  the Program Integra-
 tion Project,  and  1n Program Management.   All  resources  are under the  Salaries
 and Expenses  appropriation.

 P rogram^Descrl ptl on                                          '

     The  Office  of Policy  and Resource Management fOPRM), under the guidance of the
 Associate Administrator,  directs  the  Agency's  regulation  development and  review
 process,  formulates Agency policy,  and allocates the Agency's resources.

     Specifically, DPRM  reviews  all  EPA  regulations  to  ensure   consistency  with
 Agency policy,  coordinates all Internal  Agency  reviews of regulations,  and leads
 the Agency's  regulatory reform activities.

     In addition,  OPRM's   analyses  of  the economic,   energy,  and  environmental ef-
'fects  of  EPA's  regulations,  policies,  and programs, as  well  as evaluations  of the
 effectiveness of ongoing  Agency  programs,  stimulate  policy  formulation.   Through
 these  programs,  the Agency 1s developing a framework for a well-run strategic plan-
 ning and  management process, and ensuring that  EPA's program objectives and environ-
 mental goals  are clearly  defined  and met.  OPRM also provides  special  studies and
 analyses  to support Agency dec1s1onmak1ng processes  in both management and program
 areas.                 •

     Finally, OPRM  controls  the  Agency's central  planning and  budgeting process
 which  allocates  workyear   and  financial  resources  among program  areas  and ensures
 adequate  fund control.  A  brief description of each of the  program elements Includ-
 ed In  OPRM  follows.         .  .

     Program  Management -  Policy and Resource  Management —  This  program  element
 supports  the  Associate Administrator's Immediate Office and provides senior manage-
 ment,  policy  direction,  program  planning,  and  budgeting   and  resource management
 within OPRM.        .      r

     Office ofthe Comptroller— This  component develops  and  operates EPA's pro-
 gram planning and budgeting  system; analyzes  and prepares  Agency budgets  for sub-
 mission to  Congress  and OMB; and maintains the Agency's  allocation,  control, and
 review system for all workyear and  financial resources.
                          .                  .               t
     Program  Integration Project — This project 1s developing an analytic  frame-
 work for  integrating the toxics  control  activities  of  EPA's major  programs.

     Office of Pol 11cy Analysis — This  program element  contains  resources to ana-
 lyze FIT  EPK regulatibris,polides,   and programs from  the perspective  of their
 economic, energy, and environmental. Impacts and benefits.

     Office of Standards and  Regulations —  This  office manages the Agency's regu-
 1 at1on development  and  review process,  analyzes all  of EPA's regulations to ensure
 technical quality  and consistency with Agency policy, designs the Agency's regula-
 tory reform activities, and develops Innovative approaches  to  regulation,
                                       i  , i  nf

                                       MS-37 '

-------
     Office of Management Systems and Evaluation — This program operates the Agen-
cy's accountability  system,  evaTiiatesprogram  effectiveness  in  meeting  Agency
goals, and designs and  implements  necessary management  reforms,  including a system
to manage for environmental results.

PROGRAM MANAGEMENT . POLICY AND RESOURCE MANAGEMENT

1984 Program Request

     The Agency  requests  a total of  5950,900  and  16.0 permanent  workyeafs for this
program, all   of  which is  for  Salaries  and Expenses.   This reflects a  decrease  of
$101,500 and 5.0 permanent workyears from 1983.  This program will  continue to pro-
vide overall  policy  direction  and  will  conduct the activities necessary  to manage
the co;nponent  offices  of the  Office  of Policy and Resource  Management,  including
special studies and analyses to support the QPRM decisionmaking process.

1983 Program

     In 1983,  the  Agency  is  allocating a total  of $1,052,400 and  21.0 permanent
workyears to this program,  all  of  which is under the Salaries and  Expenses appro-
priation.  These  funds  support the basic  budgetary, administrative,  analytic,  and
planning activities  necessary  to manage the  Office of Policy  and  Resource Manage-
ment.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$328,400 results from the following actions:

     -Congressional Action.  (+5191,600)  EPA's application of Congressional action
to this activity resulted in the following changes:

     (+$192,000)  This  Increase  includes +5192,000 of  the S10.5 million Salaries
and Expenses add-on which supports the 480 additional  permanent full-time workyears
provided to the Agency.

     (-.5400.)  A  general   reduction  of  -$1,350,000 was   made to  Management  and
Support activities and  was applied  proportionately  to all  offices in  that media
in the Salaries and Expenses appropriation.

     -Reprogramrnings,  (+5136,800)  During the development of the  operating plan,
several reprogrammings  were made to this  activity  which  are  not  reportable under
the Congressional  reprogramnnng limitations*   These  changes  resulted  in  a  net
increase of +5136,800 to the Salaries and Expenses appropriation.

1982 Accompli shments

     In 1982,  the  Agency  obligated  a  total  of $905,700, for this program,  all  of
which was under  the  Salaries and Expenses appropriation.   These  resources allowed
the formulation of OPRM's  policy direction,  program planning, the  conduct of spe-
cial analyses, and the development of OPRM's budget and management of its resources.

OFFICEOFTHE COMPTROLLER               ,

1984 Program Request

     The Agency  requests  a total  of 52,227,800  and 45.0 permanent workyears  for
this program, all of  which is  for  Salaries and Expenses.   This reflects a decrease
of 5171,800  and 11.0 permanent  workyears from 1983.   With  these  resources,  the
Office of the Comptroller  (OC) will direct the  planning and budgeting  process used
by top  management  to resolve major policy and resource allocation  issues for the
1985 budget process; provide resource analyses,•information,  and  assistance to all
Headquarters and Regional management offices;  manage aiatj continually update the ob-
                                       MS-38

-------
                                  %stem;: and conduct analyses of  resource  trends
 (including a thorough  study  of  the Agency's support accounts) to provide  a  better
 link between planning, budgeting, and resource use.

 1983 Program

     In 1983, the Agency  is  allocating  a  total  of 52,399,600  .and  56.0  workyears to
 this program, all of  which  is under the Salaries  and Expenses appropriation.   With
 these funds,  the Office  of  the  Comptroller  is  providing rfco  improved  analytic
b«se for the projection of  outlays.  To support development  of the  1984  Operating
 Plan and the  1985 Budget Request,  OC  is  implementing management  improvements  in
 the budget  process   including  review  and  enhancement  of  the  Agency's  workload
 models and activity pricing schemes.  The Comptroller is providing special  analyses
 to support top Agency management  in  effective decision-making regarding key resource
 and policy issues.

 1983Explanation of Changes from Budget Estimate

     The net increase of +$336,100 results from the following  actions:

     -Congressional  Action.    (+$336,100)  EPA's  application  of   Congressional ac-
 tion to this "actlvity resulted in the following changes:

     (+5338,800)  This increase  includes +$338,800  of the  $10.5 million  Salaries
 and Expenses add-on which  supports the 480 additional permanent full-time workyears
 provided to the Agency.

     (-52,700)  A general  reduction of  -$1,350,000 was made to Management  and Sup-
port activities  and  was  applied  proportionately  to all  offices  in that media  in
 the Salaries and Expenses  appropriation.

 1982 Accomplishments

     In 1982, the Agency obligated a total of $2,567,000 for this  program,  of which
$2,485,300 was  for the Salaries  and Expenses appropriation  and $81,700  was  for the
Operations, Research,  and  Facilities   appropriation.   This  Office initiated the;
effort tp develop 5lts  analytic  base for proj%ct1ng  outlays and took steps  to sim-
 plify and  otherwise  advance the budget process as well  as to improve  the quality
of the Agency's workload models.

PROGRAM INTEGRATION PROJECT

 1984 Program Request

     The Agency  requests  a  total  of $3,341,600 and 12.0  permanent workyears for
 this program, all  of which  is  for  Salaries  and  Expenses.   This represents  a de-
 crease of  $174,600  and .5.7 permanent  workyears   from 1983,   reflecting the  pro-
 gress achieved  by  the Program  Integration  Project (PIP)  in  completing  the  devel-
 opment of industrial  models strategy options.  The resources  provided  will  control
 the undertaking of new industry  studies to  better  assess the  cost-effectiveness  of
 all environmental regulations  for particular  Industrial  sectors.   Also,  in  1984,
PIP will  work on a third geographic study area to  further development of strategies
 for enabling Federal,  State, and  local  governments to  jointly  develop  efficient
environmental  control  for  particular   geographic  areas.   In addition,  resources
 for this program  will  allow  for analyses  to  determine  the most effective  marmer
in which to transfer the application of the geographic  approach to Regional  Offices
 and States.

 1983 Program

     In 1983, the  Agency  1s  allocating a  total  of $3,516,200 and  17.7 permanent
workyears to this program, all of which is under the Salaries and  Expenses appropri-
ation.  These resources are being  used  to  focus on and further refine  the Industry
                                       MS-39

-------
and geographic methodologies  formulated in 1981 and 1982.   PIP is developing a  math-
ematical programming model  that will  make possible the  estimation of the  most  cost-
effective pollution control  strategies  for  the industry under  study.  An  enhanced
geographic approach  is  being  introduced as  a demonstration  in the  Philadelphia
region .and work is commencing on applying such methodology to a second demonstration
site.

1983 Explanation of Changes from Budget  Estimate

     The net decrease of -$150,800 results from the following actions:

     -Congressional Action.  (-527,800)   A  general  reduction  of -31,350,000  was
made to Managementand  Support activities  and was applied  proportionately to  all
offices in that media in the Salaries and Expenses appropriation.

     -Reprogrammings.  (-$123,000)  During  the  development  of the  operating  plan,
several reprogrammings were  made  to this activity  which are not  reportable  under
the Congressional   reprogramming  limitations.   These  changes   resulted  in  a  net
decrease of -$123,000 to the Salaries and Expenses appropriation.

19.82 Accomp 11 shments

     In 1982,  the  Agency obligated  a total  of  $2,388,700 for this  program, all  of
which was under the  Salaries  and  Expenses appropriation.  These  funds allowed  the
further development of an  integrated framework  for toxics control  and  the  formula-
tion of industry  and geographic  methodologies.   Preliminary refinements  of  these
approaches were undertaken;  the  statistical  validity  of certain  aspects of  the
models were analyzed; and both were  extended to cover ecological effects.

OFFICE OF POLICY ANALYSIS

1984 P rogram Requ est

     The Agency requests  a  total of  58,070,900 and 31.1 permanent workyears for this
program, all of which 1s  for  Salaries  and  Expenses.  This  reflects a decrease of
3291,900 and .7 permanent workyears  from  1983.   In  1984,  the Office of Policy Analy-
sis (OPA) will  focus on reviewing  existing regulations  and standards, which will  re-
quire Intensified  cost-benefit and  cost-effectiveness  analysis.   OPA  will  place
additional emphasis  on  intra-industry  and  cross-industry cost-effectiveness  com-
parison.  To effectively support  this  activity, the office  will  thoroughly review
its existing data  base  and upgrade  and expand it as  necessary.   The Agency  will
be reviewing all the  National  Ambient Air Quality  Standards  as  well as many of its
recently promulgated  effluent  guidelines.   Amendments to the  Clean A1r and  Clean
Water Acts may  lead  to even  more  extensive regulatory reviews.   OPA will  continue
its strategic  studies which  examine the cumulative macroeconomic  impacts  of  EPA's
regulations on  major industries.   OPA   will  also  initiate  a  new  Congressionally
mandated "Cost of Clean Air and Water"  report.

1983 Program

     The Agency is allocating a  total   of $8,362,800 and 31.8  permanent workyears
to this program,  all  of which  is under the  Salaries  and Expenses appropriation.
In 1983,  OPA  is  continuing to  oversee the  Agency's  Implementation  of Executive
Order 12291, working  closely  with program offices  to  evaluate  the  costs,  economic
impact, and  benefits  of prospective  regulatory  requirements  or changes.  OPA is
analyzing the  economic impact of potential  amendments  to  the Clean Air and  %Jater
Acts and  is  completing  the  "Cost of Clean  Air and Water"  report.  Work  is  also
being concluded on the  permitting  progress  of important energy  projects.   Also,
a study of  the macroeconomic  impacts  of all  EPA regulations  is  being  initiated.
                                       MS-40

-------
1983 Explanation of Changesfrom Budget Estimate

     The net decrease of -$70,200 results from the following actions:

     -Congressional Action.  (-561,400)  A  general  reduction  of  -51,350,000  was
made to Management  and Support  activities  and was applied  proportionately  to  all
offices in that media in the Salaries and Expenses appropriation.

     -Reprggranimings.  (^58,800)   During the  development  of  the  operating  plan,
severa 1 reprogrammirigs were  made to this activity  which are not  reportable under
the Congressional  reprogramming  limitations.   These  changes resulted  in a  net  de-
crease of -58,800 to the Salaries and Expenses appropriation.

1982 Accpmplishments

     In 1982, the Agency  obligated a total  of 58,098,100  for this program,  all  of
which was under the  Salaries and Expenses  appropriation.  In 1982, OPA  focused  on
regulatory reform which  was consistent with  the  Administration's  overall  economic
revitalization program. These efforts  included identifying  opportunities for regu-
latory reform through  the  revision of  specific  existing  regulations  and  ensuring
that program offices  developed  regulations  in which the marginal  benefits  accrued
exceeded the marginal costs imposed.

OFFICE OF STANDARDS AND REGULATIONS

1984 Program Request

     The Agency requests  a total  of $4,020,200  and 40,0  permanent workyears  for
this program, all  of which is for Salaries and Expenses,   This reflects an  increase
of 5175,300 and no change in permanent workyears from 1983. This level  of resources
will allow the Office  of  Standards and Regulations (OSR) to continue  its effective
management and oversight  of the  regulation  development  and review process  ensuring
compliance with Executive  Order 12291, the Regulatory Flexibility Act,  the Paper-
work Reduction Act, and Federal  Register requirements.   In  1984, OSR will intensify
regulatory reform and  rel ief efforts arid will  continue to  concentrate  on improving
the scientific, engineering,  and  statistical  base  for  regulations and policies,

1983 Program

     The Agency is  allocating  a  total  of $3,844,900 and  40.0  permanent workyears
to this program,  all  of which  is under the  Salaries  and  Expenses appropriation.
In 1983,  OSR is  initiating efforts  to improve  the  scientific,  engineering,  and
statistical  base of  the  Agency's regulations  and policies.  In addition,  OSR pro-
cedural improvements  include earlier and more substantive  technical,  economic,  and
policy review of  Agency  regulations,  standards,  and criteria.   State involvement
in the rule  development process  is also being enhanced.   OSR is  continuing to  re-
duce excessive paperwork burdens imposed by EPA regulations through the application
of rigorous independent analysis as well as  to  review  new  and existing rules  and
policies.  OSR is institutionalizing indirect offsets,  implementing fully the water
bubble program,  and  developing  reform  initiatives  In  the  pesticides  program.

1983 Explanation of Changes from Budgets Estimate

     The net increase of +5270,900 results from the following actions:

     -Congressional Action.  (+$280,900)   EPA's  application  of Congressional  ac-
tion tp this activity resulted In the following changes.

     (+$297,600)  This increase  Includes +5297,600  of  the  S10.5  million  Salaries
and Expenses add-on which supports the 480 additional permanent full-tine workyears
provided to the Agency.
                                       MS-41

-------
     (-516,700)  A  general  reduction  of -31,350,000  was made  to Management  and
Support activities and was  applied proportionately to  all  offices in  that media  in
the Salaries and Expenses appropriation.

     -Reprogrammings.  (-510,000)  During  the development  of the operating  plan,
several reprogrammings were  rnade to  this activity which  are not  reportable  under
the Congressional  reprogramming limitations.   These  changes resulted   in  a  net
decrease of -510,000 to the Salaries  and Expenses appropriation.

1982 Accomp11 :shments

     In 1982,  the  Agency  obligated  a total  of 53,683,900  for this program,  all  of
which was under  the  Salaries  and Expens.es  appropriation.   OSR reviewed  four  major
Agency data collection activities and made  recommendations  to reduce  the reporting
burden and improve the practical utility of Information collected. OSR coordinated
reviews of existing  rules to ease the burden  on  small  business  and issued detailed
operating guidance. The quality and  efficiency of the Agency's Internal  review pro-
cess was  improved  and OSR provided  technical  and  statistical policy  oversight  of
the Agency's regulations under  review.   OSR  developed  a "bubble"  approach to  water
regulation; institutionalized  the  environmental  auditor  concept; and  prepared  a
strategy for indirect offsets.


OFFICE OF MANAGEMENT SYSTEMS AND EVALUATION
1984 Program Request

     The Agency  requests  a total  of  52,250,100 and  37.1  permanent workyears  for
this program, all of which is for Salaries and Expenses.  This reflects an increase
of 365,100 from 1983 to fund anticipated personnel  compensation needs in 1984. This
level of funding will allow the  Office  of Management  Systems and Evaluation (.OMSE)
to assess  the  Agency's  effectiveness in  meeting program  goals and  commitments  by
conducting evaluations  of major  programs; running  the management  accountability
system; performing a number of quality assurance reviews;  and developing and recom-
mending corrective actions where  the  need for improvement is  identified.   Also  in
1984, OMSE will develop mechanisms  for  connecting  the accountability  system,  which
measures each program's progress  in meeting its goals  and commitments,  with  other
Agency management  systems such as  performance  standards, • merit pay,  managing  for
environmental results, and the  budget process.   In addition,  OMSE  will  work  with
Headquarters and Regional  Offices to develop improved  indicators  of environmental
status and trends,  and Improved monitoring strategies.

1983 Program

     In 1983,  the  Agency  is  allocating a  total  of 52,185,000 and  37.1 permanent
workyears to this program, all  of which is under the  Salaries  and  Expenses appro-
priation.  OMSE  is completing  the development  of  an Agency  strategic plan  for
program delegation to the States and is involved in developing other issue specific
integrated management plans through work on the Administrator's management guidance
for 1984 and 1985.  OMSE  1s  also expanding its  efforts to  Implement and refine the
accountability system for the  Administrator,  to  conduct in-depth quality assurance
reviews of programs,  and  to  promote the adoption of  baseline  measures in environ-
mental quality to assess performance and guide the Agency's allocation of resources
toward actions which  help provide  the  greatest return  in  terms of  environmental
results.

1983Explanation of Changes from Budget Estimate

     The net increase of +529,900 results from the following actions:

     -Congressional Action.  (+524,900)   EPA's  application  of Congressional action
to this activity resulted in the following changes:
                                       MS-42

-------
     {+$29,800)  This increase includes +$29,800  of  the  S1Q.5 million  Salaries  and
Expenses add-on  which  supports  the  480 additional  permanent  full-time  workyears
provided to the Agency.

     {-$4,900)  A  general  reduction  of -$1,350,000 was  made  to  Management  and
Support activities and  was  applied proportionately  to  all  offices  in that  media
in the Salaries and Expenses  appropriation.

     -Reprogramnings-   (+55,000)  During  the development  of  the operating  plan,
several reprbgranmirigs were  made to  this activity which are not reportable  under
the Congressional  reprogramming  limitations.  These  changes resulted in  a  net  in-
crease of +$5,000 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982,  the  Agency  obligated a  total  of $1,995,700  for this program,  all  of
which was  under  the  Salaries and  Expenses  appropriation.   OMSE  completed  five
evaluations of Agency-wide issues and monitored implementation  of changes  resulting
from earlier studies.  Work  continued  on  a  comprehensive delegation policy  and  on
efforts with  various  programs to encourage  the  development of  State  capabilities
to administer  delegated  programs.   The Administrator's  accountability  system  was
initially implemented and through this  system, OMSE  helped  evaluate  Agency perfor-
mance, recommending corrective action in areas where commitments  were  not met.   In
addition, OMSE began  development of  environmental indicators for assessing Agency
progress in controlling and cleaning  up pollution.
                                       MS-43

-------
           AGENCY MANAGEMENT



Office of Legal  and Enforcement Counsel


PROGRAM
Program Management -
Legal and
Enforcement Counsel
Salaries & Expenses
TOTAL
General Counsel
Salaries & Expenses
TOTAL
Regional Counsel
Salaries & Expenses
TOTAL
TOTAL:
.Salaries & Expenses
Office of Legal and TOTAL
Enforcement Counsel
PERMANENT WORK YEARS
Program Management -
Legal and
Enforcement Counsel
General Counsel
Regional Counsel
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Program Management -
Legal and
Enforcement Counsel
General Counsel
Regional Counsel
TOTAL WORKYEARS
ACTUAL
1982
(DOLLARS
31,891. 7
$1,891.7
$5,078.9
$5,078.9
$2,971.3
$2,971.8
$9,942.4
$9,942.4
31.7
108.8
69.7
210.2
45.1
122.4
79.3
246.8
BUDGET
ESTIMATE
1983
CURRENT
ESTIMATE
1983
ESTIMATE INCREASE +
1984 DECREASE -
1984 VS 1983
IN THOUSANDS)
$.676.3
$676.3
$6,326.1
$6,326.1
52,474.7
$2,474.7
$9,477.1
$9,477.1
10.9
126.2
61.4
198.5
15.4
134.8
68.7
218.9
S675.8
$675.8
$6,320.3
$6,320.3
$2,572.4
$2,572.4
$9,568.5
$9,568.5
12.0
126.3
63.4
201.7
16.4
1-34.6
70.1
221.1
S784.2
S784.2
$6,172.5
$6,172.5
$3,125.6
$3,125.6
$10,082.3
$10,082.3
15.0
119.0
70.2
204.2
19.5
129.5
78.2
227. 2
$108.4
$108.4
-5147.8
-$147.8
$553.2
$553.2
$513.8
$513.8
3.0
-7.3
6.8
2.5
3.1
,-5.1
8.1
6.1
               MS-44

-------
                               MANAGEMENT AND SUPPORT


                                 Agency Management

                      Office of Legal  and Enforcement^ Counsel
Budget Request
     The Agency requests a total  of 510,082,300 for Salaries and Expenses and 204.2
permanent workyears for 1984,  an  increase  of 5513,800 and  2.5  permanent workyears
from 1983.   The  increase is  due  primarily  to  hew  management  responsibilities
resulting from a realignment of Regional  Counsel  structure.

Program Description

     The Agency Management portion  of  the  Office of Legal  and  Enforcement  Counsel
(OLEC) includes the  Associate  Administrator, his  immediate office, and  the legal
services components  of OLEC.  The  Associate  Administrator's  office provides  ex-
ecutive management for  the Office  of  the General  Counsel  and  the Office   of  En-
forcement Counsel.   Legal  services  include  advice  and  assistance to  the  Admin-
istrator, Regional Administrators,  and  other  Agency managers  through  the  Office
of the General  Counsel and the offices  of  the  ten Regional  Counsels.  This  program
provides interpretations  of  statutes,  reviews major  regulatory actions  to  assure
legal defensibility,   coordinates  with  EPA's  enforcement  efforts,  and  handles,
with the Department of Justice,  all  litigation activities in  which EPA  is a defen-
dant.

     Program  Management - Legal  and  Enforcement Counsel  — This  program  element
provides program direction and administrative  and management  support to  the Office
of Legal and Enforcement Counsel.  It services both Headquarters and Regional  com-
ponents of the  Office  of  Legal and  Enforcement Counsel  (OLEC).   It includes execu-
tive management,  planning,   budgeting,   financial  management,  and  administrative
services for  the  Office of  Legal  and Enforcement  Counsel, including  the  Offices
of Regional Counsels.

     General Counsel  — This program  element provides Agency program offices  with
interpretations"of	"EPA statutes  and other  applicable  laws; legal  advice   on  all
major regulatory  decisions  and  other  Agency  actions;  and coordination with  the
Agency's legal  enforcement  efforts.   With  the  Department  of Justice,  it  also
handles all litigation activities in which EPA is a defendant.

     RegionalCounsel — The ten  Offices of Regional  Counsel   assist the Regional
Adtninistrators in ehsuring that  their decisions  are legally defensible  and  consis-
tent with national legal  interpretations.   They  represent  the  Regional   Offices  in
defensive litigation  activities;  review Regional  rulemakings; assist   States  in
obtaining the proper  legal  authority  to assume  responsibility for administering
environmental protection programs; and  support the  Regional enforcement litigation
program.

PROGRAMMANAGEMENT -  LEGALAND ENFORCEMENT ..COUNSEL

1984 Program Request

     The Agency requests  a total  of $784,200 and 15.0 permanent workyears for this
program, all of which  1s  for  the Salaries  and  Expenses  appropriation.   This repre-
sents an increase of $108,400 and 3.0 permanent  workyears due primarily  to  new re-
sponsibilities in providing management and administrative services to the Regional
Counsel Offices.
                                       MS-45

-------
     The request will  provide  for executive management and a  basic  level  of plan-
ning, management analysis, budgeting, financial  management, and administrative sup-
port services  to  the  Office  of Legal  and  Enforcement Counsel,  the  program will
operate in an  integrated  fashion  to  enable  the  Associate  Administrator and General
Counsel to coordinate  the  Agency's  legal  functions and manage  the  legal  resources
of the  Agency-   It also  includes a  new  function  of  providing certain  fiscal  and
administrative support  for Regional   components  of  the  Office  of Legal  and Enforce-
ment Counsel.

1983 Program

     In 1983 the Agency is  allocating a total  of S675.8QO and 12.0  permanent work-
years to this program, all of which  is for the Salaries and Expenses appropriation.

     The program provides administrative,  management,  and analytical  support to the
Office of  Legal  and  Enforcement  Counsel-   Emphasis  is  placed op  issuing  policy
and procedural guidelines  governing  the Regional  operations  of the  Office of Legal
and Enforcement  Counsel.    Improved   fiscal   and personnel  management  procedures
are being instituted to allow the Office of Legal and Enforcement Counsel  to effec-
tively manage available resources.  The program also provides for executive manage-
ment and a basic  level  of  planning, budgeting, fiscal,  and administrative management
to the Office of Legal and Enforcement Counsel.

1983 Expl anation of_Chariges from Budget Estimate

     The net decrease of -$500 results from the following action:

     -Congressional Action.  (-S500)   A general  reduction of  -31,350,000  was made
to Management and Support activities  and was applied proportionately to all offices
in that media in the Salaries and Expenses appropriation.

1982 Ac.cgnip_Tj.shnients

     In 1982,  the  Agency  obligated  a total  of  $1,891,700 for this program,  all  of
which was  for  Salaries and  Expenses.   Reorganization of the  Agency's enforcement
efforts during 1982 moved  this program from  the Office   of Enforcement  to the new
Office of Legal an.d Enforcement Counsel.

     Activities focused  on providing   executive  management,   planning,  analytical
support, budgeting, financial  management,  and administrative services to the Office
of Enforcement.  Emphasis  was  placed on implementing  a hazardous  waste enforcement
program, conducting  cross-cutting policy  analyses,  and   developing  the  capability
to use  criminal   sanctions under  EPA  statutes, as  appropriate.    This  component
operated and maintained an enforcement docket system.

GENERAL COUNSEL
19.84 Program Request

     The Agency  requests  a total  of  $6,172,500 and 119,0 permanent  workyears  for
this program,  all  of  which 1s  for  the  Salaries  and Expenses  appropriation.  The
decrease of 5147,800  and  7.3  permanent workyears reflects a  shift in workyears to
the Regions to meet the demands of Regional caseload.

     The 1984  Headquarters  program will  be devoted  to defensive litigation  of ex-
isting regulations, review  of  legality of enforcement policies,  response  to "chal-
lenges to  enforcement activities, and  advice on legal  defensibility  and  require-
ments of proposed  regulations, and  other Agency  actions  or  operations.   Special
emphasis will  be placed  on Hazardous Waste,  Air,  and Water  programs.   The  Office
of General   Counsel  will   be prepared for  review of  new regulations  which  may  be
necessary under possible new Clean Water and Clean Air Act legislation.
                                       MS-46

-------
     The Office of the Deputy General Counsel  will  also  provide  greater support to
the enforcement litigation program,  through  such  activities as review  of  proposed
pleadings and review of certain enforcement referrals  to  the Department  of  Justice,
to ensure consistent interpretation of the law.

1983 Program

     In 1983, the  Agency  is allocating  a  total  of $6,320,30.0 and  126.3 permanent
workyears to this program, all  of which  is for Salaries and Expenses.

     The 1983 program provides continued support to Agency media  program priorities
through legal advice and assistance, handling defensive litigation,  and  participat-
ing in  selected  administrative  proceedings.   The 1983  program' also  incorporates
coordination with  the  Office of  Enforcement  Counsel  and  support  to the  Regional
enforcement litigation program.

1983 E XP1 anat i on of_Changes from Budget E sti mate

     The net decrease of -55,800 results from the  following action:

     -Congressiona] Action.  (-$5,800)   A general  reduction  of  -51,350,000  was
made toManagement  and Support  activities  and was applied  proportionately  to  all
offices in that media in the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982,  the  Agency   obligated  a total   of $5,078,900  all  of  which  was  for
Salaries and Expenses.

     In 1982,  the  General Counsel  supported  Agency priorities by  providing legal
advice and  support  to  Agency managers  and  defending  the Agency in  all  litigation
filed against  it.   OGC also reviewed  selected regulatory actions  to ensure legal
defensibility and  advised on other  actions,  such as grants,  contracts,  and per-
sonnel actions.

REGIONAL COUNSEL

1984 Program Request

     The Agency requests  a  total  of 53,125,600,  all  of  which is for Salaries  and
Expenses, and 70.2  permanent workyears  for  1984,  an  increase of $553,200  and  6.8
permanent workyears  from  1983.   The  increase reflects   a  shift  in  workyears  from
the General Counsel to meet the demands of legal  workload in the  Regions.

     The 1984 Regional  program will  provide legal  advi'ce  and consultation to Region-
al programs  and  will  act  as  lead EPA attorneys  on defensive  litigation  Involving
principally Regional issues.  Other  major-activities  include reviewing  State legal
authorities and advising  States in  program  assumption matters related to  the  Re-
source Conservation and Recovery  Act (RCRA)  and  other statutes; providing support
to the  construction grants  program; and  assisting  States  in making  changes  in
statutes and  regulations  resulting  from amendments  to  environmental  statutes.
The Regional Counsels  also  manage  and review the work of  the  Regional  enforcement
litigation program  to  ensure that legal procedures  and enforcement policies  are
consistently followed.

1983 Program                                                                  •  '

     In 1983,  the  Agency   is  allocating a total  of S2,572,400 and  63.4 permanent
workyears to this program, all  of which is for Salaries  and Expenses.  The  Regional
program includes assistance  in  furthering the assumption  of environmental  protec-
tion programs by States by  providing advice and  assistance  to State  agencies.   On
an ongoing basis,  in  the  construction grants  area, it handles administrative pro-
                                       MS-47

-------
ceedings, such as bid  protests  and grant appeals, and  advises  on  problems  arising
from outstanding grants.  The 1983 program also incorporates  coordination  with the
Office of Enforcement  Counsel  and  support  to the Regional  enforcement  litigation
program.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$97,700 results from the following actions:

     -Congressional  Action.  (-31,600)   A  general   reduction of  -51,350,000  was
made to  Management  and Support  activities  and  was applied proportionately  to all
offices  in that media in the Salaries and Expenses appropriation.

     -Reprogrammlngs.  (+399,300)  During  the development  of the operating  plan,
several  reprogrammings were  made to this activity which  are not  reportable under
the Congressional   reprogrammfng  limitations.   These  changes  resulted  in  a  net
increase of +599,300 to the Salaries and Expenses  appropriation.

1982 Accomplishments

     In 1982,  the  Agency   obligated  a total  of  $2,971,300,  all  of  which was for
Salaries and Expenses.  In 1982, the  Regional  Counsels supported  Agency  priorities
by providing legal  advice and support to Regional  managers and defending  the Agency
in all  litigation filed against  it.   They  also  advised on actions such  as  grants,
contracts, and personnel  actions.   Additionally,  Regional  Counsel activities in-
cluded advising State agencies  on the legal  requirements for assuming  environmental
protection programs,  assisting  in  drafting  appropriate  regulatory  language,  and
helping negotiate and document  the  terms of delegation agreements.
                                      MS-48

-------
                                  AGENCY MANAGEMENT

                               Office of Administration
                                ACTUAL
                                 1982
                  BUDGET
                  ESTIMATE
                    1983
CURRENT
ESTIMATE
  1983
ESTIMATE
  1984
        INCREASE +
        DECREASE -
       1984 VS 1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Program Management -
Administration
 Salaries & Expenses
        SI, 315.3   $2,188.2
TOTAL   $1,315.3   $2,188.2
Financial Management -
Headquarters
 Salaries & Expenses
        $6,528.4   $6,482.2
TOTAL   $6,528.4   $6,482.2
Contracts and Grants
Management
 Salaries & Expenses
Personnel and
Organization Services
 Salaries & Expenses
        $6,250.6   $5,508.0
TOTAL   $6,250.6   $5,508.0
        $5,946.7   $4,596.2
TOTAL   $5,946.7   $4,596.2
Facilities & Management
Services
 Salaries & Expenses
Information Systems &
Services
 Salaries & Expenses
Occupational Health &
Safety
 Salaries & Expenses
TOTAL:
 Salaries & Expenses

Office of
Administration
        $6,148.6   $4,463.1
TOTAL   $6,148.6   $4,463.1
        $6,382.6   $5,258.3
TOTAL   $6,382.6   $5,258.3
                     $441.7
TOTAL                $441.7
       $32,572.2  $28,937.7

TOTAL  $32,572.2  $28,937.7
 $2,136.9
 $2,136.9
 $3,887.0
 $3,887.0
 $7,116.2
 $7,116.2
 $6,089.7
 $6,089.7
 $5,669.1
 $5,669.1
 $4,077.2
 $4,077.2
$1,908.4
$1,908.4
$3,460.8
$3,460.8
$8,088.6
$8,088.6
$6,631.1
$6,631.1
$5,807.0
$5,807.0
$4,652.8
$4,652.8
             -$228.5
             •$228.5
             -$426.2
             -$426.2
              $972.4
              $972.4
              S541.4
              S541.4
              $137.9
              S137.9
              S575.6
              $575.6
$28,976.1  $30,548.7  $1,572.6

$28,976.1  $30,548.7  $1,572.6
                                      MS-49

-------
                                  AGENCY MANAGEMENT

                               Office of Administration

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE  -
                                           1983       1983             1984 VS  1983

PERMANENT WORKYEARS
Program Management -
Administration
Financial Management -
Headquarters
Contracts and Grants
Management
Personnel and
Organization Services
Facilities & Management
Services
Information Systems &
Services
Occupational Health 4
Safety
TOTAL PERMANENT WORKYEARS
TOTAL WORKYEARS
Program Management -
Administration
Financial Management -
Headquarters
Contracts and Grants
Management
Personnel and
Organization Services
Facilities & Management
Services
Information Systems &
(DOLLARS I

18.2
142.1
153.8

128.2

183.6
135.7

761.6

-28.3
184.8
184.9

177.9

211.6
167 . 0
N THOUSANDS

31.0
146.0
131.0

106.4

140.6 '
112.6
8.0
575.6

43.0
185.1
152.5

147.8

162.6
137.1
)

'34.0
91.3
166.7

127.1

165.5
92.3

676.9

44.7
110.7
205.3

176.6

188.7
109.1


32.0 -2.0
89.8 -1.5
165.3 -1.4

125.1 -2.0

160.5 -5.0
89.3 -3.0

662.0 -14.9

43.0 -1.7
111.0 .3
206.6 1.3

173.6 -3.0

181.1 -7.6
106.1 -3.0
Services

Occupational  Health &
Safety

TOTAL WORKYEARS
             8.0
954.5      836.1      835.1      821.4     -13.7
                                       MS-50

-------
                               MANAGEMENT AND SUPPORT


                                 Agency  Management

                              Offl£e_ of  Adtnlnijtratl on


Budget Request

     The Agency requests a total of $30,548,700 of Salaries  and Expenses  funds and
6.62.0 permanent -workyears for the Office  of  Administration in  1984, an  increase  of
51,572,600 and  a  decrease  of 14.9 permanent  workyears  from 1983.  The dollar in-
crease fully  funds  workyear  costs including  the  Medicare  tax,  while the  workyear
reduction reflects  savings  in   administrative  expenditures  consistent  with  the
Agency's overall workyear level.

Program Description

     The Office of  Administration  (OA)  performs  Agencywide  administrative manage-
ment and  support  functions  and provides admim"strative  services to  Headquarters
and our  two  largest operations—Research Triangle Park  (RTP),  North Carolina  and
Cincinnati, Ohio.    In  addition,  the  OA  provides certain  administrative  support
services for  the entire  Agency,  including buildings  and facilities management and
nationwide support functions.

     The immediate  office  of the Assistant  Administrator  provides overall  direc-
tion for all  OA activities  as  well  as  Agencywide policy  regarding  administrative
and support  services.   There are five  organizational components under the Assis-
tant Administrator  for Administration.  The  Office of Fiscal  and  Contracts Manage-
ment is  responsible  for the  Agency's financial  accountability,  contracts  adminis-
tration, and  grants management.  The  Office  of  Personnel and Organization  provides
services in the areas of personnel  administration and organizational  analysis, and
administers the Agency's  occupational health and safety  program.   The Office  of
Management Information  and   Support  Services provides management  of the  Agency's
ADP resources,  library   management,   facilities  acquisition  and  management,  and
general supporting  services.   The OA at RTP and Cincinnati  provide services  and
support similar to  those at  Headquarters to the  environmental  programs   at  EPA's
major field  locations.   A  brief  description of  each of the program elements  in-
cluded in OA  follows.

     ProgramManagement -Administration --  This  program element  consists of  the
AssistantAdminTstrator's immediate  off 1 ce which  provides  service delivery  over-
sight, planning functions, and  performs  all  of the  budgeting  and  resource manage-
ment activities within OA.

     Financial j^anagejnent - Heaj^uartejs — this  component Includes  financial  man-
agement pollcy "arid  accountTng^"and  fi nancial  reporting activities  for Headquarters
and non-Regional field offices.

     Contracts and Grants Management —  , This program element  provides  resources
to establish  Agencywide contracts  and"  grants  policy;  to  award  and administer
contracts and  small  purchases at headquarters, RTP,  and Cincinnati; and  to  award
and manage Headquarters grants and other financial assistance programs.

     Personnel and Organization Services —  This   program  provides  resources  for
Agencywide personnel  policy   guidance  and  personnel  services  such  as  staffing,
classification, and  training  to  headquarters   and  non-Regional   field   offices;
Agencywide management analysis  and directives management;  and the  Agency's occupa-
tional health and  safety program designed to maintain safe  working  conditions and
to protect the health of our employees.
                                      MS-51

-------
     Facilities and Management Services  —  This program element provides  resources
for facilities .acquisition,  maintenance,  and management; audiovisual and printing
operations; personnel  security  and  property  maintenance and  protection; manage-
ment of the Nationwide Support, Headquarters Support, and Buildings  and Facilities
accounts; and the  immediate  offices  of the Directors  of the Office of Management
Information and Support  Services,  and  the  Offices of Administration at Cincinnati
and Research Triangle Park.

     Information Systems and Services -- Included  in  this program  element  are  re
sources for the  Agency's centralized ADP  systems management  and  data processing
support staff; the  Library  Systems Staff,  which  maintains  the Agency's  libraries
at headquarters,   Cincinnati,  and  Research  Triangle  Park;   and  the ADP  services
component within the Office of Administration at Cincinnati.
                                      MS-52

-------
PROGRAM MANAGEMENT - ADMINISTRATION

19.84 Program Request

     The Agency requests 51,908,400 from  Salaries and Expenses and 32.0  permanent
workyears for this  program;  the  decrease  of $228,500  and 2.0 permanent  workyears
reflect savings gained  through Improved  management.   This level  of  funding  will
allow us to maintain  current service levels for  the  basic budgetary,  administra-
tive, analytical,   and strategic planning  needs  of  the  Office  of Administration
(OA).  In 1984, the Office will provide  overall  direction of the  OA,  manage  and
control OA's resources, and  continue  to develop and initiate  strategies to  enhance
the efficiency and effectiveness of OA.

1983 Program

     In 1983 the  Agency  is  allocating  $2,136,900 from Salaries  and  Expenses  and
34.0 permanent workyears for this  program^   This  program  is providing  senior  man-
agement support for OA initiatives  to centralize  EPA's  ADP management and  systems;
strengthen EPA's financial  management, including  cash and credit management;  pro-
vide guidance and   stimulation  for grant  and  contract regulation simplification
efforts; and improve  the  control  and management  of the Agency's Support  Services
funds.  In addition,  this  office  is continuing to manage the Agency's  cost  reduc-
tion programs and evaluate EPA's utilization of capital  assets.
1983 Explanation of . jh^.g^s^j'IM JBujdg_et_Est1inate_

     The net decrease of -551,300 results from the following  actions:

     -Congressional Actions.  (+$54,700)   EPA's application of Congressional  action
to this activity resulteiTin the following changes.

     (+$59,800)  This increase  includes  +$59,800  of  the  $10.5  million  Salaries  and
Expenses add-on  which  supports  the  480  additional  permanent  full-time  workyears
provided to the Agency.

     (-$5,100)  A  general   reduction  of  -$1,350,000 was  made  to  Management  and
Support activities and was  applied proportionately to all  offices  in that media in
the Salaries and Expenses appropriation.

     -Reprpgraminlncjs.  (-$106,000)  During  the  development of the  operating  plan,
several reprbgrammTngs were  made to  this activity which  are not reportable  under
the Congressional  reprogramming  limitations*   These changes  resulted  in  a  net
increase of +$26,600 to  the Salaries  and  Expenses  appropriation.

     The Congressional 1y approved change  of -$132,500 realigned  PC4B and  workyears
among program elements in the Office of Administration reflecting current  workyear
and salary  projections.    The   Congressionally  approved  reprogramming above  was
included in a letter to  Congress on November 17, 1982.

1982 Accomplishments

     In 1982, the Agency obligated $1,315,300 from Salaries  and Expenses  for this
program.  The  Office oversaw  the development of  several  priority actions  within
the OA: improved  contracts and  grants management,  cost  reduction  and  containment
strategies, better  financial  management,  analysis  of ADP consolidation,  capital
asset management,  position  management  planning,   and  improved  service  delivery.
In addition, we  achieved Improved service and efficiencies  from the consolidation
within the  immediate office of  the  Assistant Administrator  of  the OA's  adminis-
trative, budgetary, analytical, and long-range planning resources.
                                       MS--53

-------
FINANCIAL MANAGEMENTj- HEADQUARTERS

1984 Program Request

     The Agency requests S3,460,800  from  Salaries and Expenses and 89.8  permanent
workyears for  this  program,  a  decrease  of S426.200  and  1.5 permanent workyears.
The dollar decrease reflects the transfer of financial management  computer services
to the Support Services program.  Through this program element,  we will  standardize
financial and  accounting  transaction processing  so   that  it  is  controlled  though
still  responsive to  both Agencywide  and program-specific  needs  and provides  the
services to the Agency  necessary  to meet  our statutory requirements,  these  ser-
vices include,  but  are  not limited  to:   basic  accounting  .and  payroll   support;
accountability throughout  the  Financial  Management  System;   support  to  enhance
OPRM's efforts  in budget execution  and  resource  control  at  the  allowance  level;
processing of  grant,   contract,  purchase  order,  travel,  and  other  vouchers  and
claims; and financial   reporting required  to meet  Agency  fund  control  requirements.
These resources will   also  support  our  efforts  to   refine  Agency  accounting  and
financial policies;  increase  operational  productivity through  automation;  improve
internal day-to-day financial  service;  provide controls which  permit us  to  detect
and prevent fraud,  waste,  and abuse; and perform a  full  range  of  cash management
reviews.

19B3 Program

     The Agency is  allocating  S3,887,000  from Salaries and Expenses  and  91.3  per-
manent workyears for  this  program.   This Office  is   increasing automated  services
to further reduce the necessity for individual systems at the fund control  activity
level; meeting external reporting requirements  of OMB,  Treasury,  and  the  Congress;
implementing OMB Circular 83-6, which requires establishing a policy for accelerat-
ing the processing  and  deposit of receipts;  improving  control  over disbursements;
and eliminating idle cash balances.  Through  further  automation,  we expect to  con-
tinue to reduce paperwork within  the financial management area.  For example,  the
expansion of  our  automated  commitment entry  system at  the  program office  level
will  eliminate excessive paper transactions.

1983ExplanationofChangesfromBudget Estimate

    The net decrease of -52,595,200 results from the following actions:

     -Restructuring.  (-$1,79.9,500)   The  Congressional ly  approved  restructuring
transferred thegrants  activities  previously  in  this  program  element   into  the
Contracts Management program  element which was then  retitled Contracts and  Grants
Management.  This program element,  which was retitled Financial  Management provides
resources for  the Director  of  the  Office of  Fiscal  an.d Contracts Management  and
the Financial  Management Division.

     -Con gres s i ona1  Ac tip n.  (-$8,500)  A general  reduction of -$1,350,000 was made
to Management and Support activities and was applied proportionately to  all offices
in that media in the Salaries and Expenses appropriation.

     -Reprogrammings.   (-$787,200)   During  the development of  the  operating  plan,
several reprogrammings were  made  to this  activity  which are not importable  under
the Congressional  reprogramming limitations.   These  changes resulted In a net  de-
crease of -$105,100 to the Salaries and Expenses appropriation.

     The Congressional ly approved change  of -$682,100 realigned PC&B  and  workyears
among program elements i.n the Office  of  Administration  reflecting current workyear
and salary  projections.    The   Congressionally approved  reprogramming  above  was
included in a letter to Congress on November 17, 1982.
                                       MS-54

-------
1982 Accomplishments

     The Agency  obligated  56,528,400  from Salaries and Expenses  for  this  program,
which included  the  grants  function in  1982.    In  addition  to  routine  financial
management activities,  we  began  to   implement  an  automated  travel  information
system which  provides  better management  of  travel  dollars and  serves  as a  basis
for the  Agency  to more  equitably  distribute "its travel  ceiling.   We  revised  our
reporting systems to  provide information  in  a more useful  format to  Agency  line
managers.  We have  strengthened our efforts  to  collect  interest and  overdue  ac-
counts receivable  and,   in  1982,  we  collected 5621,000.   We  have  also  reduced
our own overdue accounts payable by over 90%.

     In the  Federal   assistance  area,   we initiated projects to  consolidate  and
simplify EPA's  grant  programs,  provided  administrative  and technical  assistance
to EPA  Regional   offices and  assistance  recipients,  and  administered the  Head-
quarters grants  program, including  the  award  process.   We  continued our  grant
regulation reforms to  eliminate unnecessary reporting  requirements  and  red  tape,
and we  introduced a pilot program  to  consolidate and  simplify  the  administrative
handling of  State  grants.   The  results  of  these  activities  included  resource
savings, clearer  accountability, and  simplifed, more efficient  communication  with
State and local  governments.

CONTRACTS AND'GRANTS MANAGEMENT

1984 Program .Request

     The Agency requests $8,088,600 from  Salaries and  Expenses and 165.3 permanent
workyears for this program, a decrease of  1.4 permanent workyears, and  an increase
of 3972,400.  The Increase in  dollars  will  support increases  in workyear  costs,
ADP contract support for the Automated Procurement System, and an expanded training
program for project officers.

     In the Contracts area, our request will  enable us  to:  process contract awards
and purchase orders;  close out existing contracts; conduct cost evaluations of con-
tractor cost proposals; process contract terminations and claims; and provide tech-
nical  review, policy compliance, and administrative management to three contracting
and purchasing offices.  These resources also will support an automated procurement
document system and the  project officers  training  course,  initiated in  1983,   In
the Grants and  other  financial  assistance area, these  funds will allow us to:   de-
velop and interpret policy and  procedural  guidance for Agencywide assistance  pro-
grams; award  and  administer  headquarters  grants;  respond  to  requests  for ad  hoc
assistance by Regions,  programs,  and federal  assistance  recipients; simplify  our
grant regulations; Increase in-house audit-and cost analyses;  and, continue efforts
begun in 1983  to debar  and  suspend persons  who abuse  the privileges  of Federal
assistance.  These resources will  also  support cost and  benefit  analyses  on  grant
regulations and Grants Information and Control  System data verification.

1983 P rogram

     The Agency  is  allocating  37,116,200  from  Salaries and  Expenses and  166.7
permanent workyears for  this program.  In  the  Contracts  area,  we anticipate award-
ing contract actions  totalling  5223 million  and processing purchase  order actions
for $50 million.   Our key objectives  are managing  contracts (as opposed  to  just
awarding them),  increasing productivity and simplifying tasks in contracts process-
ing and administration,  further  automating the  procurement  system, and instituting
a project officer training and  certification  program   that  will  aid  in producing
more understandable  Requests  for  Procurement  against  which  our   vendors  bid.

     In the  federal   assistance  area,   we are  streamlining  the  regulations  to
eliminate unnecessary  and  duplicative  requirements and  to reduce the  informatipn
burdens our  regulations  impose  on  grantees.   We also  are  developing  guidance for
                                       MS-55

-------
EPA managers  and  our  grantees  on  the  revised  (simplified)  regulations.   We  are
continuing to administer grants  funded  by  Headquarters  program  offices  and  as  part
of our efforts to manage the Agency's audit coordinator!  function,  we  are  identify-
ing and tracking all  exceptions  from  point of issue to final resolution.  We  will
ensure debarment  or  suspension  of persons  who abuse  the  privileges  of  Federal
assistance through  waste,   poor  performance,  or  corrupt  practices.   This   will
result in  greater  efficiency,  program integrity, and a significant dollar  savings
to the Government,   In addition,  the responsibility  of managing  the Agency's  Inter-
governmental Agreements  will   be  transferred to  our  grants  division  in  1983.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$1,608,200 results from the following  actions:

     -Restructuring.  (+$1,799,500)   The  Congressionally   approved  restructuring
transferred the grant  activities previously in the Financial  and  Grants Management
program element  into  the  Contracts  Management  program element,  which  was  then
retitled Contracts and Grants  Management.  The Financial  Management program  element
provides resources for the  Director of the  Office of Fiscal  and Contracts Management
and the Financial Management Division,  The Contracts and Grants Management  program
element now includes  the resources  for  the Procurement  and  Contracts  Division,  the
Contracts Management Staff  located at RTP and  Cincinnati  and the Grants  Administra-
tion Division.

     -Congressional Actions.  (+340,600)  EPA's application  of Congressional  action
to this  activity resulted  in  the following changes.

     (+348,000)  This increase includes  +$48,000 of  the $10.5 million Salaries and
Expenses add-on  which supports  the 480 additional  permanent  full-time  workyears
provided to the Agency.

     (-37,400)  A  general   reduction  of  -51,350,0.00 was  made  to Management  and
Support activities  and  was  applied proportionately  to all   offices  in  that  media
in the Salaries and Expenses appropriation.

     -Reprogrammings.   (-3231,900)   During  the  development  of  the  operating  plan,
several reprogranrnings were made to  this  activity which are not  reportable  under
the Congressional reprogramming  limitations.   These  changes  resulted in a  net in-
crease of +$61,000 to the Salaries  and Expenses appropriation.

     The Congressionally approved  change  of -3292,900  realigned PCSB  and  workyears
among program elements in the  Office  of Administration reflecting  current workyear
and salary  projections.   The  Congressionally   approved  reprogramming   above  was
included in a letter to Congress  oh November 17,  1982.

1982 Accomplishments

     The Agency  obligated $6,250,600  from Salaries and Expenses  for  this program,
which did not include the grants  function in 1982.  With these resources,  we award-
ed contract  actions  totaling  S260 million  and purchase  order  actions .totalling
$47 million.   We  began  to  implement   streamlined  contracting  procedures  which
expedite contract processing.   We  also  began to automate  the  procurement  system
on a  pilot basis  at  headquarters,  resulting in  greater   efficiency  and  shorter
processing time.   We  continued  to negotiate overhead  rates with  EPA  contractors
and assistance  recipients   in  support  of  our  own   operations  and  OMB Circular
A-87 (regarding  indirect  costs  for State  and  local  governments).   We also  con-
tinued our participation with  OMB  in  the  implementation  of  the  Federal  Acquisition
Regulations.
                                      MS-56

-------
PERSONNEL A"D ORGAN IZATION JERV ICES

1984 Prog rain -Request

     The Agency requests 56,631,100 from Salaries  and  Expenses and 125.1  permanent
workyears for this program, an increase of  $541,400 and a decrease  of  2.0  permanent
workyears.  The increase in dollars will  fund increased workyear costs and contrac-
tor support  to  supplement the  Management  and  Organization Division's analytical
efforts.  With  these  resources,  the  Personnel  Management Division  will  provide
basic personnel  services required by law and  will  continue its  productivity assess-
ment and Performance  Management System  activities,  as  well  as training,  records
processing, and personnel  systems support.  These activities are designed to further
enhance a  total  human  resource  management program  for  EPA.   The Management  and
Organization Division  will continue  to provide  an  array of organizational  and
administrative services to Agency  managers  including  its organizational  process
review studies to  improve  program effectiveness and efficiency.   The  Occupational
Health and  Safety  Staff   will  fully   service  all  established health  and  safety
programs.

1983 Program

     The Agency  is allocating  $6,089,700  from Salaries  and  Expenses  and  127.1
permanent workyears for this program.

     In 1983, the  Personnel  Management  Division  will  assure effective  workforce
planning and position management;  maintain a positive  and strong  labor  relations
program to deal  effectively  with  employee unions;  assure  efficient  and  effective
administration of  the Performance  Management  System mandated  by the  Civil  Service
Reform Act;  and  maintain   a  viable program review,  evaluation,  and  analytic  cap-
ability to assure  that  EPA personnel  policies and programs meet  the  needs  of  the
Agency.  Our personnel management services  will  continue to meet statutory and pro-
grammatic requirements.   We  are consolidating the Personnel Management Division's
special programs  and  external   employment  activities  to  utilize resources  more
effectively; reducing personnel  staffing and  classification capacities to reflect
a reduced  Agency  workforce;  and  focusing  training and  executive  development pro-
grams to  strengthen  Agency  management and  to  re-train  employees to improve  the
skill mix  in  our workforce.  These  activities  will combine  to form a strong  and
comprehensive human resource management  program,  which we are  initiating  in 1983.

     The Management and Organization Division  is  expanding its organizational pro-
cess review  studies  of Agency  offices  to  improve program  effectiveness  and effi-
ciency.

     In 1983, the  Occupational  Health  and Safety Staff  is conducting job  hazard
analyses, administering the Headquarters safety program, maintaining  an  automated
information system  for  accident  and  medical   data,   monitoring  the Agencywide
medical monitoring  program,   and  updating  Agency  health  and  safety  directives.

1983 Explanation_ofChanges from BudgetEstimate

     The net increase of +$1,051,800 results  from the following actions:

     -Restructuring.  (+$1,020,900)   The  Congressionally  approved  restructuring
combineH resbiirceis from this program element,  formerly  titled  Personnel  Management,
with resources  from  other program  elements  for the Office of Health and Safety,
Management and Organization  Division  and the Immediate  Office of  the Director  of
Personnel and Organization.   The  expanded program element was  retitled  Personnel
and Organization Services.  This provides improved resource management by  combining
offices with functions related to personnel matters into one program element, i.e.,
personnel policies, organization analyses,  and health and safety policies.
                                       MS-57

-------
     -Congressional Actions.   (+595,000)   EPA's application of Congressional  action
to this activity resulted in  the following changes.

     (+5100,400)  This  increase  includes  +5100,400 of  the $10.. 5 mm Ion  Salaries
and Expenses add-on which supports the 480 additional  permanent full-time  workyears
provided to the Agency.

     (-55,400)  A general reduction of -SI,350,000 was  made  to Management and  Sup-
port activities  and  was applied  proportionately  to  all offices  in  that  media  in
the Salaries and Expenses appropriation.

     -Reprogrammings.  (-564,100)  During  the  development  of the operating  plan,
several reprograminings  were  made to  this activity which  are not reportable  under
the Congressional  reprogramming  limitations.   These  changes resulted  in  a  net
decrease of -$115,100 to the  Salaries  and Expenses appropriation.

     The Congress!anally approved  change  of  +$51,000 realigned PCSB  and  workyears
among program elements in the Office  of Administration  reflecting current  woricyear
and salary  projections.  The   Congressional1y  approved  reprogramming  above  was
included in a letter to Congress on November  17,  1982.


198 2Ac comp1is hments

     The Agency  obligated  35,946,700  from Salaries   and  Expenses  in this  program
element, which  contained  only  the Personnel  Management   Division  (PMD)   in  1982.
PHD completed implementation  of a performance appraisal  system for General  Schedule
employees and initiated efforts to make the personnel  system, primarily  the Perfor-
mance Management System, more  accomplishment-oriented in   order to improve person-
nel planning  and productivity  throughout  the  Agency.  At the same  time,  we  met
statutory and programmatic requirements which  included; processing staffing,  clas-
sification, and  other  personnel  and   payroll   actions; maintaining basic  personnel
programs including  employment  and training  policy,  labor and employee relations,
and personnel  program  evaluation; assisting in  workforce  planning;  and  leading
position management  studies.   We also   significantly  improved  our  delivery  of
services to Agency  managers  and employees.

     In 1982, the Occupational Health  and Safety Staff developed industrial hygiene
standards for  laboratory  operations.  ' We  expanded our safety programs  for  those
EPA employees who faced serious safety and health threats.  Our training and educa-
tion efforts  emphasized  the  delivery  of  specialized  training to meet  the  diverse
needs of our employees.  We  also strengthened our medical  monitoring  activities,
which included  preemployment,  preplacement,  and  fitness  medical  evaluations,  to
protect individual  workers and co-workers.  Finally, we  continued   our efforts to
inspect and evaluate EPA facilities.

FACIIITIESAND MANAGEMENTSERVICES

1984 Program Request

     The Agency  requests 55,807,000 from  Salaries and Expenses and  160.5  permanent
workyears for this  program,  an increase,of 5137,900 and  a  decrease of 5.0  permanent
workyears.   The  increase  in  dollars  reflects  anticipated  increases  in   workyear
costs.   The  decrease  in requested workyears  reflects  a   reduction  in  our  audio-
visual  and  printing  needs due  to Agencywide  elimination  of  unnecessary  publica-
tions.   The  resources  requested  will  provide general  office  and  building  services
for Headquarters,  Cincinnati,   and  Research  Triangle Park  (RTP),  and management
direction for  the  Office  of  Information Systems  and  Support  Services and  the
Offices of Administration at Cincinnati and RTP.  We  will  continue  current service
levels  and we will maintain  our commitment to  ensuring  the most  effective and  cost

-------
efficient facilities management possible, including  our  commitment  to  use  contrac-
tors only  where cost-effective.  We  will  continue  efforts  to Improve  contractor
management, and ensure maximum  efficiency and benefit from both in-house  and  pri-
vate sector  services.    We  will  strengthen  property and  supply  management  and
continue to upgrade the physical conditions  at Waterside  Mall.

1983Program

     The Agency  is  allocating  S5,669,100  from Salaries  and  Expenses  and  165.5
permanent workyears to this program.   We are  completing  efforts  begun in  1982  to
control costs in telecommunications,  mail,  space management, and facilities  engi-
neering and  construction,  while  maintaining  the  overall  current  level  of  basic
services.  We  are  strengthening  Headquarters contract  and  project management  to
assure more  cost-effective use  of contract dollars  and  enhanced  delivery  of  ser-
vices.  In addition, we  are emphasizing  cost  containment and accountability In the
provision of  nationwide  guidance  for administrative  support   services; providing
operational support  and  housekeeping  service for  the EPA  facilities located  at
headquarters, Cincinnati, and  RTP; managing  the Agency's  Nationwide  Support  and
the Buildings  and  Facilities  accounts;  and  providing facilities  engineering  and
construction expertise to all  Agency programs.

1983 Explanation ofChanges from BudgetEstimate

     The net increase of +51,206,000 results from the following actions:

     -Restructuring.  (+5477,900)  The Congressionally approved restructuring trans-
ferred some discrete activities previously in  the Other Management Services program
element into the Facilities  and  Support  Services  program element.  The  resources
previously 'included in Other Management Services  for  the Immediate Office of Manage-
ment Information Systems  and Services  and  the  Office  Directors at RTP and Cincinnati
were transferred into  Facilities and  Support Services.   This program element  was
then retitled Facilities and Management Services.

     -Congressional Actions.   (+598,100)   EPA's application of  Congressional  action
to this activity resulted in the  following changes.

     (+$100,000)  This increase includes +$100,000 of the S10.5 mil.lion Salaries and
Expenses add-on  which  supports  the 480 additional  permanent   full-time workyears
provided to the Agency.

     (-51,90,0)  A  general  reduction  of  -$1.,350,000  was  made to  Management  and
Support activities  and  was  applied proportionately  to all  offices in that  media
in the Salaries and Expenses appropriation.

     -Reprogrammings.  (+$630,000)  During  the development of  the  operating  plan,
several reprograrnmlhgs were made to  this activity  which  are not reportable  under
the Congressional reprogramming  limitations.   These  changes resulted  in a  net in--
crease of +515,100 to the Salaries and Expenses appropriation.

     The Congressional 1y approved change of +5614,900 realigned PC&B  and  workyears
among program elements in the Office  of: Administration reflecting current  workyear
and salary  projections.   The   Cohgressionally  approved  reprogramroing  above  was
included in a letter to Congress on November  17, 1982.

1982 Accomplishment^

     The Agency  obligated  56,148,600 from  Salaries  and Expenses to  this  program.
We initiated  major   cost  containment  efforts in  three   operational   areas  (mail,
telecommunications, and  copying  and  duplicating),   implemented nationwide  manage-
ment/user accountability systems  to  collect  better  user data  and  to permit  full
                                       MS-59

-------
job costing  and  consistency  in  the  delivery  of  services,  and  implemented  an
umbrella support  services  contract  at  Headquarters.   We  also began  to  improve
working conditions at Waterside  Mall  through an aggressive  facilities  maintenance
management and inspection program.

INFORMATION SYSTEMS AND  SERVICES

1984 Program Request

     The Agency requests $4,652,800 from Salaries  and Expenses and 89.3  permanent
workyears. an  increase   of  $575,600,   reflecting higher  personnel  costs  in  this
program, and  a  decrease of 3.0  permanent workyears.  Our  central  ADP management
group sets Agencywide ADP policy; assists  EPA  programs  in developing  and  maintain-
ing computerized  information  systems;  operates  the  Agency's  timesharing  computer
center at Research Triangle Park, North  Carolina (RTP); and  coordinates Agencywide
ADP services  to  assure  more  effective, efficient,  and  responsible  use  of  our ADP
services.  These  resources will  enable  us  to manage EPA's data center  facility  in
RTP, maintain  a  financing  mechanism and accounting  methodology for  central  time-
sharing services, develop Agencywide information management policies  and  procedures,
and maintain data standards to ensure the data integrity which is  critical  to EPA's
mission and program objectives.   In  1984, we  will begin  to address data  base appli-
cations and  the  distributed  processing  network  (Regional and  laboratory  minicom-
puters and telecommunications) throughout the Agency, and  strengthen our  centralized
management of the Agency's  ADP investment begun in  1983.

     The Library Systems Staff will  provide reference  information, loan  and litera-
ture search  services, public  information  services,  contract  management  for library
services, and  administrative  management of  the Agencywide library  system.   In
addition to  traditional   library  services,  these resources will enable  us  to .main-
tain the  Information Clearinghouse,  which  coordinates  all  Agency  environmental
data bases.

1983 Program

     The Agency is allocating 34,077,200 from Salaries  and Expenses  and  92.3 per-
manent workyears  for this program.  These resources support  ADP activities includ-
ing managing  EPA's  data center  facility and maintaining  those systems  which  are
essential to  the  Agency's mission.   We  provide ADP  planning and   system  design
assistance to program offices, focusing our resources  toward  high  priority systems.
We are  emphasizing  the improved  compatibility and  efficiency  .of  the   Agency's
automated systems .and the development of a prototype office  automation  system.   We
are initiating  an effort  to  consolidate  the  management  and  control  over  Agency
ADP systems  in  a  central  office within OA to  eliminate duplicative  systems  and
redirect resources to improve  access to automated data bases and efficient electronic
communications systems.

     In 1983,  library   systems  and  services  include:   basic  loan   and  reference
services; completion  of a  single automated  catalog  of  Agency library  holdings;
and, in  response  to  requests  from the  public,  provision of rules,  hearing records,
comments on  Agency rule-makings,  and publications.   Library  procurement activities
are being centralized,  and the  Information  Clearinghouse is  being maintained and
operated as a reference  service for EPA information  managers,

1983 Explanation of Changes from Budget Estimate

     The net decrease of -51,181,100 results from the  following actions:

     -Restructurings.   (-$1,498,800)  The Congressionally  approved restructuring of
-S477,900 transferred some  discrete activities  included  in   this program  element,
previously titled Other  Management Services  into the Facilities  and Support Services
program element.  The resources  transferred included the Immediate Office of Manage-
ment Information Systems and Services and the Office  Directors at RTP and  Cincinnati.
                                       MS-60

-------
     The Congressionally approved restructuring of -51,020,900 transferred resources
from this program  element  for  the Management  and Organization  Division and  the
Immediate Office of the  Director of  Personnel  and Organization to the  ne*  program
element entitled Personnel and Organization Services.  The balance of  this,  program
element which  includes  the central ADP  systems  staff and  the Library  staff,  was
retitled Information Systems and Services.

     -Congressional Action.  (-32,200)   A general  reduction  of -51,350,000 was  made
to Management and Support activities  and was  applied  proportionately  to all  offices
in that media in the Salaries and Expens.es appropriation,

     -Reprogramminqs.   (+5319,900)   During the development  of the operating plan,
several reprpgrammirigs were  made  to  this activity which  are  not reportable  under
the Congressional  reprogramming limitations.   These  changes  resulted in a  net  de-
crease of -$121,800 to the Salaries and Expenses  appropriation.

     The Congressionally approved change of +5441,700  realigned PC&B and workyears
among program elements in the Office of Administration reflecting current workyear
and salary  projections.    The   Congressionally  approved  reprogramming  above   was
included in a letter to Congress on November  17,  1982.

1982 AccompVishmjnts

     The Agency  obligated $6,382,600  from Salaries  and  Expenses  for  this  program
in 1982 to support  information  management  activities,  library  systems,  the  Manage-
ment and Organization Division, and  the immediate offices of  the Directors  of the
Office of Management  Information and  Support  Services  and the Offices  of Adminis-
tration at Cincinnati" and Research Triangle Park.   In 1982,  this program  element
was titled Other Management Services.

     During 1982,  our  ADP management  division provided  general  systems  oversight
and managed EPA's  data   center.  It  also maintained  those  AOP systems that  were
critical to the  Agency's  mission and  performed the feasibility study  on the  con-
solidation of EPA's AOP activities.

     The library staff began to implement a single on-line  data base  of all  Agency
library holdings and  to  write  guidelines  for  the  bibliographic management  of  all
EPA generated reports that  support program offices.  The  Information  Clearinghouse
conducted an on-going  inventory of all  EPA  environmental measurement  data.   Data
search and  referral   services  performed  by  the  Clearinghouse were  available  to
all EPA employees.

     The Management  and  Organization   Division  provided  internal   administrative
and organizational   analytical   services  to all  Agency offices.   This  division's
responsibilities included  advising the Administrator  on  reorganization  issues  and
providing analytical  support  to senior managers, as  well   as administrative  and
technical assistance for  directives and forms  management.
                                       MS-61

-------
Page Intentionally Blank

-------
  Regional
Management
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents

                                                                            Page

MANAGEMENT j SUPPORT

   REGIONAL  MANAGEMENT
       Regional  Management...	,	  MS-63
          Regional  Management	  MS-65
          Planning, Evaluation, & Analysis - Regions	,	  MS-66
          Financial Management - Regions	  MS-68
          Personnel Management- Regions	  MS-68
          Administrative Management - Regions.....	  MS-69
                                      MS-62

-------
                                 REGIONAL MANAGEMENT
                                 Regional Management


PROGRAM
Regional Management
Salaries & Expenses
TOTAL
Planning, Evaluation &
Analysis - Regions
Salaries 8 Expenses
TOTAL
Financial Management -
Regions
Salaries & Expenses
TOTAL
Personnel Management -
Regions
Salaries 4 Expenses
TOTAL
Administrative
Management - Regions
Salaries & Expenses
TOTAL
TOTAL:
Salaries & Expenses
Regional Management TOTAL
ACTUAL
1982
(DOLLARS
39,617.8
$9,617.8
$3,668.2
$3,668.2
$2,375.0
S2, 375.0
52,952.1
52,952.1
55,904.9
35,904.9
S24, 518.0
524,518.0
BUDGET
ESTIMATE
1983
CURRENT ESTIMATE INCREASE +
ESTIMATE 1984 DECREASE -
1983 1984 VS 1983
IN THOUSANDS)
39,087.0
59,087.0
34,646.2
$4,646.2
52,433.7
$2,433.7
52,764.1
S2, 764.1
55,398.2
35,398.2
$24,329.2
524,329.2
38,913.5
$8,913.5
34,077.6
54,077.6
$2,390.4
$2,390.4
52,859.4
32,859.4
$5,136.7
35,136.7
323,377.6
323,377.6
38,926.6
$8,926.6
$4,291.8
$4,291.8
$2,558.8
$2,558.8
$2,664.4
$2,664.4
$5,119.4
35,119.4
523,561.0
$23,561.0
$13.1
$13. 1
$214.2
$214.2
$168.4
$168.4
-$195.0
-3195.0
-$17.3
-317.3
3183.4
5183.4
PERMANENT WORKYEARS

Regional  Management               192.4      140.3       160.3    •   160.3
Planning, Evaluation &             97.3       94.2       106.2       97.2      -9.0
Analysis - Regions
Financial Management -             81.8  '•     73.8        73.8       73.8
Regions
Personnel Management -             86.1       80.6        80.6       72.6      -8.0
Regions
                                       MS-63

-------
                                 REGIONAL MANAGEMENT
                                 Regional Management
                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE +"
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE -
                                           1983        1983              1984 VS 1983
Administrative
Management - Regions
TOTAL PERMANENT WORKYEARS
(DOLLARS  IN  THOUSANDS)
  145.4      137.1       137.1
  603.0
526.0
558.0
                      131.1
                      -6.0
535.0     -23.0
TOTAL WORKYEARS
Regional  Management
Planning, Evaluation &
Analysis - Regions
Financial Management -
Regions
Personnel Management -
Regions
Administrative
Management - Regions
TOTAL WORKYEARS
  250.0      200.0     217.7       198.2      -19.5
  108.8       95.2     108.9       103.6      -5.3
   93.4
  106.4
 81.8
 98.7
 82.4
 99.1
 82.4
 86.1     -13.0
  182.5      168.3       167.3       159.3
                                 -8.0
  741.1
644.0      675.4      629.6     -45.8
                                      MS-64

-------
                             MANAGEMENT AND SUPPORT


                              Regional Management
Budget Request
     The Agency  requests a  total  of  $23,561,000  from  the  Salaries  and  Expenses
Appropriation and 535.0  permanent  workyears in  1984,  an increase of  3183,400 and
a decrease of  23.0  permanent  work/ears from 1983.   The decrease in permanent work-
years is located in:  Planning, Evaluation  and  Analysis;  Personnel Management; and
Administrative Management.  This level  of resources  in the  Regional  administrative
offices provides services  consistent with  our  Regional program  workforce levels.

Program Description

     This component covers the  salaries  and expenses  of the  ten  Regional  Adminis-
trators, their immediate  staffs, and the  staff  offices reporting directly  to them,
Additional activities  include  Regional central   management  functions  such  as pro-
gram planning, budgeting, analysis and evaluation;  financial  and personnel manage-
ment; and administrative services.

     Regignal Management—  This  unit includes  the  Regional  Administrators  and
tne1r~Tmm~edla'te  staff s7  as  well  as  the  basic   staff   functions  of  civil   rights,
public affairs, Congressional, and intergovernmental  activities.

     Planning, Evaluation, ami Anajysis -  Regions  —   Resources  in   this  program
elementi provide  analytical  support  to the  Regional  Administrators  to  assure the
efficient and  effective  operation of  EPA  Regions-    Activities  include  planning,
budget development,  accountability   reporting,  program  evaluation,  economic  ana-
lysis, management,  and Regional participation in EPA's regulatory process.

     Financial Management -  Regions  -*  This program  element  provides  financial
accounting and reporting services  for the Regional  Offices.

     Personnel Management- Regions —  These resources provide basic  personnel ser-
vice s7"TnTT"u3Tng staffing;  classification,  and  training, to  the  Regional  Offices.

     Administrative Management -Regions —  This   group  of  activities  includes
mini-computer systems management; r tTSrary  support,   safety,  security,  printing and
copying, facilities  management,  small  purchases,  and  other  administrative  func-
tions.

REGIONAL MANAGEMENT

1.984 Program Request

     The Agency  requests  a  total  of 58,926,500 and 160.3 permanent workyears for
this program, all  of which is  for the Salaries and Expenses  appropriation.   This
represents an increase of 313,100  and no change in permanent  workyears from 1983
]evels.  The budget  request  will  enable  the program to  continue  to  provide senior
management and policy  direction for  the  Regional Offices, to  shape  and articulate
policies defining Regional relationships  with State  and local  governments, respond
to inquiries from Congress,  the  news media and  the  public, establish  regular com-
munications with public interest,  environmental, and business groups,  and  maintain
Civil Rights and Freedom of Information programs.

1983 Program

     In 1983, the Agency  is  allocating a total   of 58,913,500 and 160.3  permanent
workyears to this function,  all of which is  for  the Salaries and Expenses appropri-
ation.  Basic press services and media  relations activities  are being maintained as
                                       MS-65

-------
well as policy guidance and  executive  direction for the Region as a whole.   The pro-
gram will  continue the  processing  of Freedom  of  Information  requests,  issuing
critical news  releases, maintaining a  Regional Civil  Rights  program,  responding to
Congressional inquiries, and  coordinating  EPA involvement in major  State  environ-
mental . issues.

1.983 Explanation of Changes from Budget Estimate

     The net decrease of -5173,500 results  from the following actions:

     -Congressional Action.   (+5416,500)   EPA's  application  of  Congressional  ac»
tion to tnTs' activity resulted in the following changes:

     (+5426,800)  This  increase  includes  +$426,800  of  the $10.5 million  Salaries
and Expenses add-on which supports the 480  additional permanent full-time  workyears
provided to the Agency.
                                 . f
     (-310,300)  A  general  reduction  of   -$1,350,000  was made  to  Management  and
Support activities  and  was  applied proportionately  to all  offices  in that  media
in the Salaries and Expenses appropriation.

     -RepTOgrammings.  (-$590,000)  During  the development of the  operating  plan,
several reprogranmilngs were  made to this  activity which  are not  reportable  under
the Congressional  reprogramming  limitations.   These  changes resulted  in  a  net
decrease of -.-5590,000 to the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982, the  Agency  obligated 59,617,800 all of which  was  from  the Salaries
and Expenses appropriation.  This program provided support for the  Regional  Admin-
istrators and their immediate  staffs,  as well as for the  basic  staff  functions of
civil  rights,  public  affairs,  Congressional  and  intergovernmental   activities*

PUNNING,EVALUATION, AND ANALYSIS - REGIONS

1984 Program Request

     The Agency  requests  a  total  of  $4,291,800  and 97.2 permanent workyears  for
this program, of which all is for Salaries  and Expenses.   This reflects an increase
of $214,200 and  a  decrease  of 9.0 permanent  workyears from  1983.   The decrease in
workyears results  from  work  completed with 1983 resources for  instituting manage-
ment for  environmental  results  and   accelerating   regulatory   reform.   In  1984,
resources will allow  the  Regions to execute  essential Regional  planning,  resource
management, program evaluation,  and analytic  activities.   The  Regions will  place
special emphasis  on  fiscal  management and control,  streamlining   budgetary  pro-
cesses, and  shifting  Regional  programs  from an  implementation to an  oversight
role.

1983 Program

     In 1983, the  Agency  is  allocating a  total  of  $4,077,600 and  106.2  permanent
workyears to this  program, all  of which is under the Salaries and  Expenses appro-
priation, to conduct the planning, evaluation, budgeting,  and analysis functions in
the ten Regional Offices.   Resources  for  1983 reflect the increased importance of
budget execution and control  functions, plus  the  Regional  component of the Agency-
wide initiative to implement measures  for regulatory reform and to institute manage-
ment for environmental  results.   These resources  allow Regional  Administrators to
effectively and efficiently manage  their  Regions  by  providing  sound analysis con-
cerning Regional policy,  process,  and  resource management.   The Regions  are con-
tinuing to focus on  accountability  reports, program  evaluation,  economic  analysis,
and improvement  of  Regional  • planning,  analytic,  and  management  capabilities.
                                       MS-66

-------
1-933 Explanation of Changes from Budget Estimate

     The net decrease of -5568,600 results from the following actions:

     -Congressional Action.  (+5248,900)  EPA's application of Congressional  action
to this activity resulted in the following changes:

     (+5253,800)  This increase includes +5253,800 of the $10.5 million Salaries and
Expenses add-on  which supports  the  480  additional  permanent full-time  workyears
provided to the Agency.

    (-54,900)  A  general   reduction  of -$1,350,000  was  made to  Management  and
Support activities  and  was applied  proportionately  to all  offices  in that  media
in the Salaries and Expenses appropriation.

     -Reprogramnn'ngs.  (-$817,500) During the development  of the operating  plan,
several- reprpgrammings were made to this activity  which  are  not  reportable  under
the Congressional  reprogramming  limitations,   these  changes resulted   in  a  net
decrease of -5817,500 to the Salaries and Expenses appropriation.

1982 Accompl i shnien ts

     In 1982, the  Agency  obligated a total  of $3,668,200  for this program,  all  of
which was under the Salaries and Expenses appropriation.   These resources  were used
to design and implement the Regional component of the Administrator's  new account-
ability system and to manage organization  studies to adjust the Regions  to  projected
program, policy,  and resource  changes.  The Agency  also  implemented  procedures
designed to expedite permit issuance in the Regions.

FIN ANCIAl HANAG E tCNT - REG I ON 5

1984 P rogram Request

     The Agency  requests  $2,558,800  from Salaries and Expenses and  73.8  permanent
workyears for this program.  This is an increase of 5168,400 but  no change in work-
years.  It  reflects  increased  workyear costs.  At this level  of  funding, Regional
finance offices will provide basic services  and maintain ongoing  and  routine  finan-
cial management  functions.  This includes  maintenance of  GAO-approved  accounting
and internal control systems,  processing obligation transactions,  processing  vouch-
er payments,  conducting  payroll  activities, preparing   billings  and  processing
collections, providing monthly  fund  control  and financial  reports,  and  processing
and paying  claims  for travel.   Further  automation  of EPA's  financial  management
processes will  free  resources to  strengthen our  cash and credit  management,  inter-
nal control  initiatives,  and data integrity and quality assurance.

1983 Program

     The Agency  is  allocating  $2,390,400 from Salaries and  Expenses and  73.8 per-
manent workyears  to  this  program.  With these  resources,  the  Regional  finance
offices continue to  provide all  basic  accounting, payment processing,  and payroll
support activities, and are increasing resources for audit coordination and follow-
up activities.   This  includes tracking  a"11  audit exceptions from  point of issue to
final resolution.   We are  continuing  efforts to  detect  abuse of Federal  funds;
strengthening credit management  to  ensure timely and  economical   collection  of all
monies owed  EPA;  and implementing  an  Agencywide data  Integrity  assurance program
to provide timely, complete, and accurate financial reports.

1983Explanationof Changes from Budget Estimate

     The net decrease of -$43,300 results from the following actions:
                                       MS-67

-------
     -Congressional Action.   (+510,100)  EPA's application of Congressional  action
to this' activity resulted in the following changes:

     (+$12,000)  This increase  includes  +$12,000  of the S10.5 million Salaries and
Expenses add-on  which supports  the  480 additional   permanent full-time  workyears
provided to the Agency.

     (-$1,900)  A  general   reduction  of  -SI,350,000 was  made  to Management  and
Support activities  and  was applied proportionately  to  all  offices  in that  media
in the Salaries and Expenses appropriation.

     -Reprograipings.  (-553,400)  During  the development  of the operating  plan,
several reprograrariings .were  tnade to this  activity  which  are not  reportable  under
the Congressional  reprogramming limitations.   These changes resulted   in  a  net
decrease of -$53,400 to the Salaries and Expenses  appropriation.

1982 Accgmpljshments

     The Agency  obligated  $2,375,000  from Salaries  and Expenses  for this program
in 1982.  With  these resources, Regional  finance  offices began to  strengthen the
automated financial  control  systems  and implement  an  internal  control   system  to
improve EPA's defense against  the  misuse of Federal resources.  They  also ensured
that billing  and  collection  activities  met the  President's commitment to  cash
management.  Other  activities   supported  by  this  program  included:   payroll  and
fiscal support  services; timely  collection of monies owed EPA;  data  integrity and
quality assurance  programs;  and timely,  accurate   financial  reports  to  support
Regional management.

P.E.RSONN.EI MAHAGjEMENT - REGIONS

1964Program Request

     The Agency  requests $2,664,400  from Salaries and  Expenses  and  72.6  permanent
workyears, the decrease of $195,000 and  8.0  permanent workyears  reflecting overall
Regional workforce  reductions   and fewer  hiring   actions.   These  resources  will
allow us  to  maintain ongoing  and  routine personnel management  activities and  to
fulfill statutory  requirements.  Regional  personnel  offices  will  continue to pro-
cess staffing actions, classification, payroll and  personnel  actions,  and training
requests; administer  the  Performance Management  System  training  for all  General
Schedule employees;  conduct  nondiscretionary labor   relations  activities; and pro-
vide management  studies  and organizational  analyses to support  Regional  managers.

1983 Program

     The Agency  is  allocating  $2,859,400 from Salaries  and  Expenses  and  80,6 per-
manent workyears to  this program.   The  Regional  personnel  offices  are  providing
basic personnel  services as well  as Region-specific  management  and  organization
assistance to Regional managers.   They  are conducting position management studies,
organizational analyses,  and training  programs  to   assist managers  in  optimizing
personnel resources.  Regional  personnel  offices  also  counsel  Regional  employees
affected by  workforce  adjustments  (e.g.,  transfers,  relocations,  outplacement)
and provide  training to  facilitate the ^transfer  of personnel among  Regional  pro-
grams.  Current  labor  relations activities  include  negotiations and consultations
with employee unions,  on-site  negotiations,  grievance  and arbitration representa-
tion, and  unfair  labor  practice  charge  processing.   We  are  also  refining  the
Performance Management and Merit Pay  program required   by  the Civil  Service Reform
Act, and  operating the  Federal  Equal Opportunity  Recruitment Program  required  by
Title 5.»
                                       MS-68

-------
1983 Explanation of Changes from Budget Estimate

     The net increase of +595,300 results from the following actions:

     -Congressi ona 1 Ac tion.   (-$1,200)  A  general  reduction  of  -SI,350,000  was
made toManagementandSupport  activities  and  was applied proportionately to  all
offices in that media in the Salaries and Expenses appropriation.

     -Reprogratpinp.  !+S96,500)  During the development  of the  operating  plan,
several reprogramraings were  made to this activity  which  are not  reportable  under
the Congressional  reprogramming limitations.   These  changes  resulted  in  a  net
increase of +596,500 to the Salaries and Expenses appropriation.

1982 Acconip 1 ishments

     The Agency  obligated  52,952,100  from  Salaries and Expenses for  this  program.
We provided  quality  personnel  management services to Regional managers  in  order
to support  the  Regions'   mission  and  programs;  assured  effective  planning  for
Regional workforce adjustments  resulting from organizational and program  changes;
provided advice  and  assistance to  employees;  and  represented  the  Agency with
employee unions.   Regional  personnel   offices continued  to  provide  basic  person-
nel services,  which   included:   processing  staffing,  classification,  payroll  and
personnel  actions,  and training  requests;  providing  Performance  Management Sys-
tem training  for  all  General   Schedule  employees;  conducting   day-to-day  non-
discretionary labor  relations   activities;  providing  supervisory  and management
training programs; undertaking  position management  studies  to  assist managers  in
establishing effective  organizational  structures;  and  providing  special  emphasis
programs to support Agency missions and policies.

ADMINISTRATIVE MANAGEMENT - REGIONS
1984 Program Request

     The Agency requests 55,119,400 from Salaries  and Expenses and 131.1  permanent
workyears for  this  program,  a  decrease of  517,300 and  6.0 permanent  workyears.
This decrease  reflects  a  savings  realized  in general  office  services,  property
and supply management and  information management activities.   These  resources  will
support ongoing activities such as basic ADP  service, Regional Office and laboratory
facility management,  general  office services  and  management,  Regional  libraries,
space management  activities,  mall  service,   and  property  and  supply  management.
The Regions will maintain the current level  of effort in contracting and purchasing
activities, and will continue to ensure the safety  and security of Regional  person-
nel and property.

1983 Program

     The Agency 1s  allocating $5,136,700 from Salaries and Expenses and 137.1  per-
manent workyears to provide Regional administrative support in the following areas:
administrative information  systems, minicomputer  systems,  AOP  services,  Horary
support, safety and  security,  purchasing,  property  and  supply  management,  mail,
space management,  printing and  copying,, facilities management, records management,
and contracts management.  Savings  in the areas of property and supply management,
in-house computer processing,  in-house printing  and  copying,  telecommunications,
and space  management are  enabling  the  Regions to Improve  the quality and  cost-
effectiveness of their administrative services.                               .

1983 Explanjtign^ of Changes^ from Budget Estimate

     The net decrease of -$261,500 results  from the following actions:

     -Restructurino.  (-$769,800)  The Congressionally  approved  restructuring trans-
ferred resourcesfrom Administrative management  into the  Regional  Support  Costs
                                       MS-69

-------
in the Regional  Offices.   The Administrative Management program element  consisted
of the  salaries and  expenses associated  with providing  Regional  administrative
services.

     -Congressional Action.  (+5111,800)   EPA's application of Congressional  action
to this activity resulted in the  following changes;

     (+$115,000)  This  increase  includes  +5115,000 of  the SI0.5  million  Salaries
and Expenses  add-on  which  supports the  480  additional  permanent full-time  work-
years provided to the Agency.

     (-53,200)  A general  reduction  of SI,350,000  was made to Management  and Sup-
port activities  and  was applied proportionately to  all  offices  in  that media  in
the Salaries and Expenses appropriation,

     -Reprogrammings.  (+$396,500)   During  the  development of the operating  plan,
several reprogrammings were  made to this activity which  are  not  reportable  under
the Congressional reprogrammlng  limitations.  These  changes resulted in a  net in-
crease of +5396,500 to the Salaries and Expenses appropriation.

1982 Accomplishments

     The Agency  obligated  55,904,900 from  Salaries   and  Expenses  to support this
program.  This program provided a wide range  of administrative services  to  support
all Regional programs,  which included:    acquisition  and  management of  equipment,
supplies, and  services',  management  of  Regional ADP  resources;  and provision  of
library systems  and  services.  As  part  of our  commitment to provide  the  highest
possible level  of  administrative  services, we  maintained  administrative  informa-
tion systems  and  minicomputer  operations  to  ensure  effective  ADP   operational
support for  for  Regional  programs,  provided  administrative direction  for  support
activities and  services, maintained Regional  library  operations,  and managed word
processing equipment and systems  acquisition.   We also coordinated Regional  records
management, directed  contracting  and  purchasing  activities, ensured  safety  and
security in the Regions, and managed property  and supplies.
                                      MS-70

-------
Page Intentionally Blank

-------
Support Costs
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
MANAGEMENT^SUPPORT

   SUPPORT COSTS
       Support Costs	•.	  MS-72
          Nationwide Support Services	  MS-74
          Headquarters Support Services	  MS-74
          Regional Support Services	  MS-76
          ADP Support Costs.	,	.	  MS-76
          Professional Training	  KS-77
          Lab Support - Research A Devel opment.	  MS-78
          Lab Support - Air, Noise 4 Radiation	  MS-78
          Lab Support - Pesticides & Toxic Substances........	  MS-79
                                      MS-71

-------
                                   SUPPORT COSTS

                                    Support Costs

                                ACTUAL   BUDGET     CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE    ESTIMATE     1984    DECREASE -
                                           1983       1983              1984 VS  1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Nationwide Support
Services
 Salaries & Expenses          $40,125.3  $46,406.0  $47,004.0  $48,219.0   $1,215.0
 Operations, Research &            54.4
 Facilities
                       TOTAL  S40.129.7  $46,406.0  $47,004.0  $48,219.0   $1,215.0

Headquarters Support
Services
 Salaries 4 Expenses          $22,585.1  $27,024.6  $25,726.2  $26,349.2     S623.0
                       TOTAL  $22,585.1  $27,024.6  $25,726.2  $26,349.2     $623.0

Regional Support
Services
 Salaries & Expenses          $13,333.3  513,350.4  $14,282.8  512,430.4  -51,852.4
                       TOTAL  513,333.3  $13,350.4  $14,282.8  512,430.4  -$1,852.4

Automated Data
Processing Support
Costs
 Salaries & Expenses          518,286.0  517,362.2  517,194.7  514,864.0  -52,330.7
                       TOTAL  S18,286.0  $17,362.2  517,194.7  $14,864.0  -S2,330.7

Professional Training
 Salaries & Expenses             $230.7     $502.3     $497.4     $507.6      510.2
                       TOTAL     $230.7     5502.3     $497.4     $507.6      $10.2

Lab Support - Research &
Development
 Salaries & Expenses           $4,192.1   $4,710.4   54,664.9   $4,710.4      $45.5
                       TOTAL   $4,192.1   54,710.4   54,664.9   54,710.4      S45.5

Lab Support - Air,
Noise & Radiation
 Salaries & Expenses           $1,371.2   52,178.5   52,157.4   $2,178.5      $21.1
                       TOTAL   51,371.2   $2,178.5   52,157.4   52,178.5      521.1

Lab Support -
Pesticides & Toxic
Substances
 Salaries & Expenses             5132.9     5151.4     5149.9     5151.4       51.5
                       TOTAL     5132.9     $151.4     $149.9     5151.4       SI.5

TOTAL:
 Salaries & Expenses         $100,256.6 $111,685.8 $111,677.3 $109,410.5  -52,266.8
 Operations, Research &            54.4
 Facilities

Support Costs          TOTAL $100,261.0 $111,685.8 $111,677.3 $109,410.5  -52,266.8
                                       MS-72

-------
                               MANAGEMENT AND SUPPORT


                                   Support Costs
Budget Request
     The Agency requests a total  of $109,410.5  in  the  Salaries and  Expenses  Appro-
priation for  support  services  in  1984,  a decrease  of $2,266,800 from 1983.   The
decrease in requested funds i"s possible because rising  rent,  telephone,  and utility
costs are more  than  offset by reduced  space  needs  and savings resulting  from  our
cost containment initiatives in the areas of mail,  telecommunications,  and  ADP  sup^
port.

Program jescri pti on

     The Agency Support  Service  component  provides funds for general  support  to
all Agency  programs  except  Superfund.   Programs  under support   services  are:

     Hationwide Support Services -> Agencywide  costs   for  the  following support
functions: faci 1 i tiesrental  and  associated  costs; payments  to the  U.S.  Postal
Service; Federal Telecommunications Service  (FTS);  security  investigations;   reim-
bursements to  the  Federal  Employees   Compensation   Fund;  payments   to  the  Public
Health Service  for personnel  administration  services for  commissioned  officers
assigned to EPA; and,  contracts  for  EPA's occupational health and  safety  program.

     Headquarters  Support Services —  This  program  funds  local  office*  building,
and information managementservice costs  for Headquarters  and  the field offices
at Research Triangle Park,  North Carolina (RTP) and Cincinnati, Ohio.

     Regional Support.^Services —  This   component   funds  local  office,   building,
information management service  costs,  and minicomputer operations.  Also  Included
are local telephone service,  security  service, rental and  purchase of common  equip*
ment, office  and  laboratory  supplies,  and  printing and  copying  for the  Regional
offices.

     Automated Data Processing Support Costs — This program funds  timesharing  and
related data processing  services  provided to  all Agency programs  through  contracts
with commercial suppliers and in-house computer facilities.

     Professional  Training *- This component provides funds for Agencywide  training
programsIncludingexecutive  and supervisory  training  and development  programs
mandated by the Office of Personnel  Management, the Civil  Service  Reform Act,  or
by specific EPA needs.

     Lab Support -Researchand Development *-  This provides   resources   for  the
basic facilities and  operation's 'and  maintenance costs required  to operate  ORD's
seven remote  laboratories  (those  located  outside  Cincinnati, Ohio and  Research
Triangle Park, North Carolina).   Those  costs  are not covered  by  the Headquarter's
support account which  funds  similar Items  in  Headquarters, Cincinnati and  Research
Triangle Park.

     Lab Support - Air, Noise and Radiation -- This provides  funds for basic facili-
ties and maintenance costs tp  support the Motor Vehicle  Emissions  Laboratory,  the
Eastern Environmental  Radiation Facility, and the Las Vegas facility.

     LabSupport - PestlcldejandToxicSubstances—  This provides  basic facili-
ties and  operations  arid maintenance  costs	"'for' the  laboratories   1n  Beltsvllle,
Maryland and Bay St.  Louis, Mississippi.
                                       MS-73

-------
NATIONWIDE SUPPORT SERVICES

1984 Program Request

     The Agency  requests a  total  of  548,219,000  from  Salaries  and Expenses,  an
increase of -SI,215,000 over 1983.  The resources in this area fund major Agencywide
support requirements—facilities,  lease  costs,  and long  distance (FTS)  expenses
constitute the major  portion of this  element.   The request  is  only a  fractional
increase over  1983,  as  anticipated  rate  increases are  largely  offset  by  savings
from cost containment  efforts  in the areas  of space,  mail, and telecommunications.
For example, we  are  able to request reduced  long  distance (FTS)  costs  because GSA
is projecting  a  substantial  .decrease  in the Agency's  1984 FTS bill as  a  result of
our efforts  to reduce  unnecessary  use of the telephones  by  tracking  and reporting
all long  distance  calls  made  from individual  phones.   This  information  became
available through  the  use of  user accountability  equipment  installed  at  key EPA
locations.

1983 Program

     In 1983,  the  Agency  is  allocating 547,004,000 from Salaries .and Expenses for
Nationwide Support Services.   This reflects significant rate  increases  in  Nation-
wide Support costs, as well  as  changed assumptions regarding the  release of Agency
space.  With regard to the  latter, we will  be  unable to  release space  as  rapidly
as originally  planned  because  the  Agency's  on-board personnel  level  is  higher than
anticipated.  These increases will  more  than offset the savings from our cost re-
duction efforts.

1983 Explanation  of'Changes fromBudget Estimate

     The net increase of +$598,000 results from the following actions:

     -Congressional Action.   (-5450,300)   A general reduction  of -SI,350,000 was
made to Management  and iupport  activities  and  was applied  proportionately to all
offices in that media in the Salaries and Expenses appropriation.

     -Jfep_ro3ra_imi1ng_s_.   (+S1,048,30.0}   The   Congressionally  approved  reprogramming
moved resourcesFrom  Headquarters Support  into  Nationwide  Support.   Additional
funds were  necessary  for Nationwide Support  to  cover increased estimates  on rent
costs because  of  revised Agency  workforce  levels.   The  Congressionally  approved
reprogramming above was  included  in  a letter  to  Congress  on November  17,   1982,

1982 Accomplishments

     The Agency  obligated  340,129,700 for  this  program,  of which $40,125,300 was
for Salaries and  Expenses and 54,400 was for  the  Operations,  Research,  and  Facili-
ties appropriation.  This  provided Agencywide  support services  including:   space
rental (which  includes  utility  costs  at  most  locations),  postage,  FTS,  security
investigations, and other  necessary support  for the  Agency's workforce.   In 1982
we converted all  Washington  and RTP telephones to  the  382 exchange,  thus  allowing
all long  distance  calls, including  those  made  on the  Federal  Telecommunications
System,  to  be  tracked  to the telephones  from which the  call  was made.  Also,  we
installed mail  accountability  equipment  at  several EPA locations  to  better monitor
and control  Agency postage costs.


HEADQUARTERS SUPPORT SERVICES

1984 Projgram Request

    .The Agency  requests  a total  of 526,349,200 from  Salaries and Expenses, an in-
crease of $623,000 from  1983.   The resources In this  component  fund  the following
services at Headquarters, RTP, and Cincinnati;
                                       MS-74

-------
     - Office and Building Services.  This includes costs for building maintenance,
       telephone equipment  and  local   services,  utilities,   office  supplies,  mail
       operations, employee health units,  audiovisual  services and supplies,  print-
       ing services and supplies,  security  services,  and the rental,  purchase,  and
       maintenance of equipment.

     - ADP Technical  Support.  These funds provide the central ADP staff with  con-
       tractor support for national systems  development,  maintenance  and  operation,
       and other technical  services required to  support and control  the  Agency's
       ADP activities.

     - Library  Services.   This  funds  library contract operations and  provides  for
       the purchase of books and  periodicals, literature searches, and information
       retrieval.

     The request maintains the same level  of services  provided in 1983 at basically
the same costs,  (despite  Inflation) due  to  savings accruing  from the  continuation
of cost reduction  programs  instituted  in  1982 and 1983.  These  include  efforts to
control both  the  costs of providing   services  and the  demand  for such services.

19,83 Program

     In 1983, the  Agency  is allocating $25,726,200  from Salaries and Expenses to
Headquarters Support  costs.  This provides  funding   adequate  to  continue   basic
office, building,  and  information  management services,  and  to support new initia-
tives to enhance Headquarters security and  improve the  condition of  the Waterside
Mall facility.  Although  we will   continue  and  expand our  cost  reduction  efforts,
their net  effect  on  the  1983  budget  is  hard to  predict  because of  the  volatile
nature of  this  account.   For example,  higher than anticipated workforce levels in
1983 will   increase our headquarters support needs substantially, for  instance,  in
the areas of telephones and printing.

1983 Exp^anatioji of Changes fr^m Budget Estimate

     The net decrease of -51,298,400 results from the  following actions:

     -Congressional Action.  (-$250,100)   A  general   reduction  of -$1,350,000  was
made to Management and Support activities  and  was applied  proportionately  to all
offices in that media in the Salaries  and Expenses appropriation.

     -Reprograniniings.  (-$1,048,300)   The Congressionally  approved  reprogramming
moved resources  from  Headquarters  Support  into  Nationwide Support.   Additional
funds were  necessary  for  Nationwide Support  to  cover increased estimates on rent
costs because of Agency workforce levels.   The  Congressionally  approved  reprogram-
ming above was included in a letter to Congress  on November 17,  1982.

1982 Accomplishments

     In 1982, the  Agency  obligated 522,585,100  from  Salaries and Expenses,  which
prpvided the  support  services  described  above  to all  program  operations  at  EPA
headquarters, RTP,  and Cincinnati,  We  implemented   the   following  cost cutting
measures in  1982:  (1)  instituted  user-,  accountability   and control  systems  for
local telephone  service and nail   operations; (2)  consolidated  publication distri-
bution operations  in   Cincinnati;   (3)  reduced  overtime  utilities;  (4) tightened
management of printing, copying,  audiovisual,  and security  services;  (5)  improved
facilities and  property management; and, (6) established uniform accounting  sys-
tems for all support locations.
                                      MS-75

-------
REGIONAL SUPPORT SERVICES

1.984 Program Request

     The Agency  requests 312,430,400  from  Salaries  and Expenses,  a decrease  of
Si,352,400 from  1983.   This decrease  reflects  savings  in  Regional  telecommunica-
tions costs resulting  from  expansion  of  Headquarters  cost containment initiatives,
the general reduction  in the Regional workforce,  and  the shift of  Regional  focus
to the  Superfund program.   Some  of  these  savings will be  used  for an  expanded
investment in Regional  ADP resources to improve the Regions'  information  management
capabilities in two areas, minicomputer operations and financial  management systems
and subsystems.

     The requested resources will  provide basic support services to the ten Region-
al offices  including:   utilities,  telephone equipment and local  services,  office
and laboratory  facility  and equipment maintenance,  office supplies,  printing  and
copying, minicomputer  and  word processing  operations,  health units,  ApP  contract
support, and library operations and supplies*

1983 Program

     In 1983,   the  Agency is allocating  514,282,800  from Salaries and Expenses to
Regional support, an increase  of  $949,500.   This increase is  needed  to  fully  fund
cost increases  in  utilities  and  other  Regional  support services.   Based  upon
methods for ensuring   greater  consistency  and  accountability  across  all  Regions,
this level of funding will adequately provide basic services including;  utilities,
telephone equipment and local service, office and laboratory  facility and equipment
maintenance, office supplies, printing, duplicating, minicomputer and word processor
operations, health units, ADP contract support, and library services.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$932,400 results from the following  actions:

     -Restructuring.   (+5769,800)   The Congress!onally  approved restructuring trans-
ferred resources  from  Admi'nistraffve Management  Into  the  Regional   Support  Costs
program element to fund  the  non-personnel costs associated  with  providing  services
in the  Regional  Offices.  The  Administrative Management  program element  consisted
of the  salaries  and  expenses   associated  with  providing regional  administrative
services.

     -Congress 1onal Action.  (-5139,400)   A  general  reduction  of -$1,350,000  was
made to  Management  and  Support activities  and was applied proportionately  to  all
offices in that media in the Salaries and Expenses appropriation.

     -Reprogrammings.  (+3302,000)   During  the development of the operating plan,
several reprogrammings were  made  to  this activity  which are   not  reportable under
the Congressional  reprogramming limitations.   These   changes  resulted  in  a  net
increase of +5302,000 to the Salaries and Expenses appropriation.

1982Accompl 1shments

     In 1982,   the  Agency obligated  $13,333,300  to provide basic  support  services
to the ten Regional offices.   We  conducted  a  review of  these  costs  across all  ten
Regions to identify inconsistencies  In categories of  costs charged to this account
and recommended  methods  for  ensuring  greater  consistency   and  accountability.

AUTOMATED_DATAPROCESSING SUPPORT COSTS

1984 Program Reguest

     The Agency  requests 514,864,000  from  Salaries  and Expenses,  a decrease  of
 $2,330,700 from 1983,  to support the operations  of the  Agency's National  Computer
Center at Research Triangle Park, North  Carolina 
-------
assessment of  the  program  offices'  computer timeshare  service needs  for  1984 and
anticipates lower  demand  for AOP services  throughout the  Agency.   Funds  in  this
request support hardware and software equipment rental and maintenance requirements
and the contractor effort  necessary to operate  a  computer center.   This  activity
is vital to the operation  and  maintenance  of the Agency's information data systems
(including national environmental data bases,  and  Agencywide  management and admin-
istrative systems) and thus, are  inextricably tied  to  the attainment of the Agency's
environmental goals.

1983 Program

     The Agency is allocating  $17,194,700  from Salaries  and Expenses  to provide
ADP timesharing services to all Agency programs exclusive of the Superfund program.
In 1983 we are implementing the improved timeshare tracking and reporting practices
developed in 1982, thus allowing Agency timeshare users to better plan for and man-
age their automated data processing activities.

1983 Exp1anati on of Changes frpm Budget Estimate

     The net decrease of -$157,500 results from the following action:

     -Congressional Action._  (-$167,500)  A  general   reduction  of -$1,350,000  was
made to Hanagement and Su pport  activities  and was applied proportionately to all
offices in that media fn the Salaries and Expenses appropriation.

1982_Accomp1ishment5

     The Agency obligated  518,286,000  from  Salaries  and  Expenses  to  provide ADP
services to  all  Agency programs exclusive  of Superfund.  In  1982,  we  developed
better methods for recording,  tracking, and reporting timeshare use.  We developed
improved reporting  formats  to  provide  Agency managers with the information neces*
sary to support their program planning and budgeting.   In order to assure equitable
timeshare charges which accurately distribute the costs of the service, we develop-
ed improved workload forecasting techniques.

PROFESSIONAL TRAINING

1984 Program Request

     For 1984, the Agency requests $507,600 from Salaries and Expenses, an increase
of $10,200 over 1983.   The  request  maintains current professional  training efforts
for EPA  employees.  This  includes  training, mandated by  the  Office  of Personnel
Management and statutory obligations,  as  well  as  needs  identified  by the Agency's
employee training  strategy.  We  expect that, as a result  of  EPA's  newly developed
training strategy,  every  dollar  expended  for training  will   benefit the  Agency
directly and  that  the  indirect  pay-back  to the  Agency will  more  than  equal  the
costs of the training.  This funding is vital to a successful  Agency human resource
management program,  which  1s  designed to  provide  senior Agency   officials  with
tools adequate to effectively manage and utilize the EPA workforce.

1983Program

     In 1983,  the  Agency  is allocating  from  Salaries  and Expenses  5497,400  for
professional training  activities.   This  increase results  from the  inauguration,
this year, of  several  new training* programs:   comprehensive supervisory management
training, Senior Executive Service Candidate Program training, and Senior Executive
Service incumbent  development  training.  These  training and  development programs
are mandated by the Civil Service Reform Act  and  the Office of Personnel Management.

     In 1983 we  will  also  develop  an  Agencywide policy and  strategy for employee
training.  The strategy is designed  to  ensure'  that  EPA has the requisite skills
within its  workforce  to manage  Its  statutorily  mandated missions.   The  strategy
also requires that  all  training  benefit the  Agency directly  and that managers com-
pare the costs of employee  training  to  the pay-back to the Agency for that training.
                                       MS-77

-------
1983 Explanation of Changes from Budget Estimate

     The net decrease of -S4,900 results from the  following action:

     -C.ongressi ona 1 Acti on.  (-54,900)   A general  reduction of -51,350,000  was made
to Management and Support activities and was applied proportionately  to all  offices
in that media in the Salaries and Expenses appropriation.

1982 Accomplishments

     In 1982 the  Agency obligated 5230,700  from  Salaries and Expenses  to  provide
professional training courses  for EPA  employees.   This  included:   Office  of 'Per-
sonnel Management  mandated supervisory  training,  executive  development  training,
secretarial/clerical training,  and technical training.

LAB SUPPORT - RESEARCH AND DEVELOPMENT

1934
     The Agency  requests  a  total  of S4, 710, 400  for Salaries and Expenses  in  this
program.  This represents  an  increase .of  545,500 from  1983  and results from  the
increase in utility and  other  costs derived from operating ORD's system  of remote
laboratories.   These  funds  will  provide  for  essential  facility  and  maintenance
costs required  to  operate  ORD's  seven  remote  laboratories,   (Robert S.   Kerr
Environmental  Research Laboratory,  Ada; Environmental  Research Laboratory,  Athens;
Environmental  Research  Laboratory,  Corvallis;  Environmental  Research  Laboratory,
Duluth; Environmental   Research  Laboratory,  Narragansett;  Environmental  Research
Laboratory, Gulf  Breeze;  and   Environmental  Monitoring  Systems  Laboratory,   Las
Vegas).  These laboratories do  not  receive funding from the  Headquarter' s  support
account.  Services  funded include,  but are  not limited  to,  facility  janitorial
and guard services, utilities and transportation costs which are essential to  the
operation of these remote laboratories.

1933 Program

     In 1983,   the  Agency  is  allocating  a total  of  54,664,900  for Salaries  and
Expenses in this  program.  The services  provided by  this  program  are  ongoing  in
nature.  These  funds  provide for the  operation and  maintenance  of ORD's  remote
laboratories.

1983 Explanation of Changes from Budget Estimate

     The net decrease of -545,500  results from the following action:

     -Congressional Action.  (-545,500)  A  general reduction of -SI ,350,000 was  made
to Management and Support activities and was applied proportionately  to all  offices
in that media in the Salaries and  Expenses appropriation.

1982 Accpmpl i shments

     In 1982,  the Agency  obligated  a total  of  54,192,100 for Salaries and Expenses
in this program.  This  provided funding for operating  and  maintaining  ORD's  seven
remote laboratories.

LAB SUPPORT - AIR. NOISE AND .RADIATION

1984 Program Request

     The Agency  requests  a  total  of $2,178,500  for this program,  all  of which is
for Salaries and  Expenses.  This  represents an  increase  of 521,100   from 1983  for
increased contractual   services  costs.   This  program   supports  the   t4otor  Vehicle
Emissions Laboratory  (MVEL)  in   Ann  Arbor,  Michigan;   the  Eastern   Environmental
                                       MS-78

-------
Radiation Facility  (EERF)  in  Montgomery,  Alabama;  and  the  Las  Vegas  radiation
laboratory in  Nevada.   These  funds  provide  for  the  facilities  basic  operations
and maintenance  costs  necessary  to  support  these laboratories.  Support  provided
consists of security, janitorial  and  maintenance services,  utilities,  GSA vehicles,
supplies and materials, and communications.

1983 Program

     In 1983, the  Agency  is  allocating 32,157,400 for  this  program,  all  of  which
i.s for Salaries  and  Expenses.  The  1983 program is providing for  these three lab-
oratories the  same  types  of activities  described for  1984,  as these  services  --
basic laboratory operations, maintenance, and supplies — are  required on a  con-
tinuing basis.

1983 Explanationof Changesfrom  Budget Estimate

     The net decrease of -SZ1.100 results from the following  action:

     -Congressional Action.  (-521,100)  A general reduction of -SI,350,000 was made
to Management and Support  activities  and was  applied  proportionately to all  offices
in that media in the Salaries and Expenses  appropriation.

1982 Accorapli shments

     In 1982, the  Agency  obligated 51,371,200 for this program, all  of which  was
for Salaries  and Expenses.   In  support  of  the MV.EL,  the  EERF, and  the Las  Vegas
Facility, these  funds provided the basic facilities  and operations and maintenance
costs necessary to operate these  laboratories.

LAB SUPPORT - PESTICIDES AND  TOXIC SUBSTANCES

1984 Program. Request

     In 1984 the Agency requests 5151,400 under  the  Salaries  and Expenses  Appro-
priation, an increase  of  $1,500  to  cover rising  support  costs.  These  funds  will
be used for  basic  facilities  and operations and maintenance costs for the labora-
tories in BeKsville, Maryland and Bay St.  Louis,  Mississippi.   These  costs include
utilities, security,  communications  warehousing,   custodial  services   and  building
maintenance.

1983 Program

     In 1983  the Agency  1s  allocating  $149,900  for  Salaries  and Expenses.   The
1983 program supports the  same  type  of activities  as  in 1984.

1983 Explanationof Changes from  Budget Estimate

     The net decrease of -51,500  results from the  following action:

     -gongres±s1ona1 Action.  (-51,500)  A general  reduction of -51,350,000 was made
to Management and Support  activities  and was applied  proportionately to all  offices
in that media in the Salaries and Expenses  appropriation.

1982 Accomplishments

     The Agency  obligated 5132,900   from  Salaries  and  Expenses  for  continuing
requirements for general support  and  maintenance.
                                       MS-79

-------
Page Intentionally Blank

-------
Buildings and
   Facilities
     SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents

                                                                            Page

BUILDINGS S FACILITIES                                                      BF-1

       Buildings & Facilities	»	  BF-4
          Repai rs 4 Improvements	,	  BF-5
                                      SF-1

-------
                               BUILDINGS  AND  FACILITIES

                                ACTUAL    BUDGET      CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE    ESTIMATE     1984     DECREASE -
                                           1983        1983              1984 VS  1983
APPROPRIATION
                                (DOLLARS IN  THOUSANDS)
 Buildings and
 Facilities

TOTAL, Buildings and
 Facilities
$3,384.7   .$3,000,0   $3,000.0   S2,600.0    -5400.0
$3,384.7   S3,000.0   S3,000.0   $2,600.0    -S400.0
OUTLAYS
AUTHORIZATION LEVELS
S3,325.0   $3,559.0   $2,825.0   $4,689.0  +$1,864.0
By virtue of Appropriation Act.
                                      BF-2

-------
                              BUILDINGS AND FACILITIES


OVERVIEWAND STRATEGY

     The Buildings  and Facilities  appropriation funds  the design,  construction,
repair, and improvement of  buildings  occupied by EPA,  whether Federally owned  or
leased.

     For the  last  year and  a  half,  the Office  of  Administration, in  conjunction
with Regional   and  program  representatives,  has  been investigating  the costs  and
benefits of changing the current  structure  of  our  various  laboratory and  other
field operation networks.   For  thi.s analysis,  we have limited spending  for  Build-
ings and Facilities  projects  in those facilities that may  be  affected,  unless the
projects were   essential   to  safeguard  the health  and  safety  of EPA  personnel.
Recommendations resulting from  our analysis are currently  in  the final stages  of
Agencywide review.   We anticipate  tailoring  the  use of unobligated funds to  those
facilities covered by the recommendations.
                                      3F-3

-------
                               BUILDINGS  AND  FACILITIES

                                Repairs & Improvements

                                ACTUAL    BUDGET     CURRENT    ESTIMATE   INCREASE +
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE -
                                           1983        1983              1984 VS 1983
                                (DOLLARS  IN  THOUSANDS)

PROGRAM
Repairs & Improvements
 Buildings and                 $3,.384.7   53,000.0   53,000.0   52,600.0    -S400.0
 Facilities
                       TOTAL   53,384.7   53,000.0   53,000.0   52,600.0    -S400.0

TOTAL:
 Buildings and         '        $3,384.7   53,000.0   $3,000.0   52,600.0    -$400.0
 Facilities

Repairs & Improvements TOTAL   $3,384.7   53,000.0   53,000.0   $2,600.0    -5400.0
                                      EF-4

-------
                              BUILDINGS AND FACILITIES


Budget Request

     The Agency  requests 32,600,000  for  1984  in the  Buildings  and  Facilities
Appropriation, a decrease of 3400,000 from  1983.   We intend  to  focus the  avail-
able Buildings  and Facilities  resources  to those facilities and types of  projects
covered in the results of the Agency study.

Program Description

     This appropriation  funds  the  design  and construction  of new EPA facilities,
as well as necessary repairs and improvements to buildings  already  occupied by  EPA,
whether Federally owned  or  leased.  The program  contains the  following two program
elements.

     New Facilities — This  includes engineering a.nd  design  services  and  construc-
tion costsof  hew T Federally  owned  facilities to be occupied  by EPA,  or  the expan-
sion of existing Federally owned,  EPA  occupied facilities.

     Repairs and Improvements -- This  covers major  repairs  and capital  improvements
to any  buildings  or facilfifes occupied  by EPA.  Most  of the projects  relate  to
the correction of health  and  safety deficiencies,  the prevention of  serious dete-
rioration, or pollution control.

NEM FACILITIES

1984 Request

     We are not requesting any funds for New Facilities in  1984.

1983 Program

     No funds are allocated for New Facilities in 1983.

1983 Explanation of Changes  from Budget Estimate

     There were no funds obligated for this activity in 198Z.

REPAIRS AND IMPROVEMENTS

1984 Request

     The Agency  requests 32,600,000  for  this  program,  a decrease  of  $400,000.
The requested  funds  will  address the most pressing  health and safety projects  at
EPA laboratories and  other  facilities,  and  for maintenance  and  repairs  required
to prevent the  deterioration  of  EPA  occupied  facilities.   This critical  program
is directed toward providing  a  safe and healthful  working environment for EPA em-
ployees; ensuring  that   all  EPA  facilities  meet  pollution  abatement  standards;
providing facilities maintenance that  is  essential  to conduct program  operations,
prevent deterioration  of EPA  facilities,  and  provide  preventative  maintenance;
improving capabilities at both  research,  program-oriented, and Regional  laborato-
ries; and addressing Agency  requirements  for toxic  and hazardous material  handling
facilities.  Again  in  1984,  in  conformance  with the  Appropriation Committees1
concerns, this  request  contains funding  for all  repairs and  improvement  projects
over $20,000.   The  Salaries  and  Expenses (S&E) appropriation  contains funds for
projects under $20,000.
                                      EF-5

-------
1983Program

     The Agency  is  allocating  33,000,000  in 1983  for  engineering,  design,  and
construction related to  health  and  safety,  preventive  maintenance*  and  emergency
repairs at  selected  EPA  facilities.  We  will continue the  fumehood  certification
program, as  well  as  reinstitute  the  preventive maintenance  program  deferred  in
1982.  With  resolution  of  the  long-term  facilities  strategy  plan,  we  expect  to
begin funding those  priority  projects  in  conformance with the  plan.   In  line  with
reforms introduced  in  1981  and 1982,  this  budget  earmarks  funds  for  emergency
repairs and engineering  services  essential  to the timely and  effective  obligation
of buildings and  facilities  funds.   Also included 1s  funding  for space  planning,
reconfigurations, and alterations associated  with space reductions begun  in  1982.
This program, in confortnance  with the Appropriation  Committees'  concerns,  contains
funding for  all  buildings  and  improvements  projects  greater  than $20,000.   The
Salaries and  Expenses  appropriation  contains funds  for  repairs  and  improvement
projects under 520,000.

1983 Explanation ofChangesfrom Budget Estimate

     There was no change to this program.

1982 Accomplishments

     The Agency  obligated  a  total  of  53,384,700 to  correct essential health  and
safety deficiencies  and  install  pollution control devices  in  EPA laboratories  in
1982.  This  included projects  to.'    upgrade  fumehoods and  ventilation,  install
sewage disposal  systems, provide  safe storage for  hazardous and toxic  materials,
modify emergency exits,  correct faulty electrical  systems,  and modify or  replace
fire detection  systems.   We  continued the   fumehood certification  program  begun
in 1981.

     We deferred other essential maintenance and program  expansion projects  origi-
nally planned  for  1982  pending  the correction  of  health,  safety,  and  pollution
control deficiencies and the  completion of  the long-term  facilities  strategy  plan.

-------
Construction
   Grants
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                               1984 Budget Estimate
                                Table of Contents
                                                                            Page
CON STRUCncHJ GRANTS                                                         CG-1
       Construction Grants..	,	  C.G-2
                                      CG-1

-------
                                     CONSTRUCTION GRANTS

ACTUAL
1982
BUDGET
ESTIMATE
1983
CURRENT
ESTIMATE
1983

ESTIMATE
1984
INCREASE +
DECREASE -
1984 vs 1983
                                    (DOLLARS IN THOUSANDS)
Appropriation

Obligations*
 Appropriation
 Contract Authority

Outlays
 Appropriation
 Contract Authority

Liquidation of
 Contract Authority
                      SZ,400,000.0  52,400,000.0   S2,430,000.0   $2,400,000.0
-30,000.0
                      $2,116,802.7  $2,400,000.0   $3,300,000.0   52,700,000.0   -$600,000.0
                      (2,116,802.7) (2,400,000.0)  (3,300,000.0)  (2,700,000.0)   (-600,000.0)
                      (    . ...    ) (    ,..    )  (    ...     )  (     ...     )   (    ...    )

                      $3,756,152.1  $3,350,000.0   S3,TOO,000.0   $2,800,000.0   -5300,000.0
                      (3,136,819.9) (2,950,000.0)  (3,100,000.0)  12,800,000.0)   (-300,000.0)
                        (619,332.2)   (400,000.0)  (    ...     )  (     ...     )   (    ...    )
                      SI,000,000.0

Authorization Levels  S2,400,000.0
                                     $2,600,000.0  $2,600,000.0   52,600,000.0
* Net obligations in 1982 are S682 million less, and $300 million less in 1983 and 1984.
                                            CG-2

-------
                                CONSTRUCTION GRANTS


OVERVIEWAND STRATEGY

     The long range  goal  of  the Construction Grants program  is  to reduce the dis-
charge of municipal  wastewater pollutants  in  order to  improve  water quality  and
protect public health.  To meet this goal, the program provides grants to municipal
and inter-municipal agencies to assist in  financing the construction  of  cost-effec-
tive and environmentally  sound municipal  wastewater  treatment facilities to  comply
with requirements of the  Clean  Water  Act   In  addition,  the  program  provides  funds
to assist States  in  carrying  out their responsibilities in managing  the Construc-
tion Grants and water quality management planning programs.

     From 1973  through  1982,  Congress  authorized approximately  S44 billion  and
appropriated approximately $38  billion.   Approximately $34  billion has  been  obli-
gated and S2.S billion  outlayed under  P.L. 92-500. In  spite  of these large  invest-
ments in the program,  the 1980 Needs  Survey  identified  needs of  SI20  billion .for
sewage treatment  that  would  be eligible  for Federal  funding  under then-current
legislation. The Administration proposed  several  reforms  in  the  program;  they were
enacted by  the  Congress  and  signed by  the President on December 29,  1981.   The
1981 amendments to the  Clean Water Act  provide  for more cost-effective targeting
of the construction grants program. They reduce long-term expenditures for capital
investments, thereby relieving the  burden on the  Federal government  for financing
projects that  improve  the  environment marginally  or not  at  all,   and  emphasise
water quality based funding decisions.

     EPA has  simplified  program  regulations  to  eliminate   all  requirements  not
directly called  for  in   the  legislation.  These  modifications  will  provide  the
States maximum flexibility in determining the best way to implement their construc-
tion grants programs.  The regulatory   reforms have been  accompanied  by  Issuance  of
appropriate discretionary  guidance  documents.   EPA has also made  major  efforts  to
complete and close  out projects more  quickly  and to ensure  that  completed  plants
meet permit requirements.

     To meet the long range goals  of  the  program,  EPA  has identified the following
major objectives: U to  direct  funds  to  projects  with the  greatest  potential  for
improving water quality;  2)  to ensure that communities  have  the financial  capabi^
lity to construct, operate, and  maintain  proposed treatment  works that  can  become
self-sustaining; 3) to prevent  waste,  fraud, and mismanagement  and  ensure  program
integrity; 4) to  eliminate  remaining  backlogs  and prevent their  recurrence;  5)  to
implement results-oriented program management  approaches in  States  and  EPA;  6)  to
continue to  fully  delegate  project  management  responsibilities to  States;  and
7) to  continue   to  streamline  program  management  requirements.  The  requested
$2,400,000,000 will  allow States  and municipalities  to continue funding  needed
projects while maintaining program stability and integrity.
                                       C.G-3

-------
                                CONSTRUCTION GRANTS


BudgetJeqii _es t

     An appropriation  of  S2.400,000,000 is  requested for  1984  for the  municipal
construction grants  program  established under  Title  II  of  the Clean  Water  Act
(CWA), as amended  by the  1981  Clean  Water Act  Amendments.   This represents  a  de-
crease of 330,000,000 from 1983.  Obligations (net)  for 1984  are expected to  total
52,400,000,000, a decrease of 5600,000,000  from  1983.  This decrease is  attributa-
ble to a reduction In carryover funds.

Prog ram Description

     This program  provides  grants  to  municipal  and intertiiunicipal  agencies  to
assist in  financing  the  construction of cost-effective  and environmentally  sound
municipal wastewater treatment facilities;  to assist delegated States in  carrying
out their responsibilities to  manage the Construction Grants program; and to assist
States in carrying out water  quality planning programs.  The  program also provides
special funding  to   address marine   combined  sewer  overflow  problems.   Resources
associated with the management of these funds are described  in the Municipal Source
Control subactivity  and  the  Water  Quality  State Programs   Management  subactivity.

     From its annual  construction grants allotment,  a State may  reserve  up to four
percent of its authorization or $400,000, whichever is greater,  to manage its  dele^
gated activities, and must reserve  up to one percent of its allotment  or $100,000,
whichever is greater, for water quality management planning.  The Act also requires
that each State set  aside between four and seven and one-half  percent of  its allot-
ment to provide  incentives to  communities  to use innovative and  alternative  tech*
nologies in  constructing  their  wastewater  treatment facilities and  that States
having substantial rural  populations set  aside  four  percent of their   funds  for
alternative projects  in small  commmunities.  All grants for  assisting in  the devel-
opment and  construction  of  wastewater  treatment facilities are  to  be  awarded  on
the basis of a State's priority  system,  which is designed to  ensure that funds  are
awarded to  projects  with the  greatest  potential   for  improving  water  quality.
Through the  end  of  FY  1982,  approximately  $34 billion had  been obligated  under
this program, with approximately S4.1 billion still  unobligated.

     Before the 1981  Amendments, projects  were  done in three  stages with separate
grants awarded to  a  community  for  the  planning (Step 1), design (Step 2),  and
construction (Step 3)  phases  of each project.   In  order  to make the  process more
efficient, the 1981  Amendments  eliminated the   three-step  procedure   and  provided
for allowances for  the planning  and  design  costs.  Provision  is  also made  for
advances to enable small   communities, otherwise  unable to finance such activities,
to plan  and design projects.   Other  provisions  designed to make the  program more
efficient and  cost-effective  include eliminating funding to  construct  excess  re-
serve capacity,  limiting  project eligibilities  beginning   in  1985,  expanding  the
secondary treatment  definition, and extending for one year  the period for coastal
cities to seek secondary  treatment waivers under Section 301(h).

     The 1981 Amendments  also  emphasized increased non-Federal  responsibility  for
financing, constructing,   and  operating  cost-effective treatment works   that meet
their permit requirements.  The  local  funding share will  increase from  25% to  45%
for awards made beginning in FY 1985.  Srantees  must now demonstrate  prior to  award
that the most  economical  and cost-effective alternative has been selected,  includ-
ing construction, operation, maintenance,  and  replacement  costs.  Value engineer-
ing review  is mandatory for projects  above $10  million.  Additionally, engineering
firms will  be expected to  oversee  a project's  first  year  of  operation to help
ensure that it meets  design and permit specifications.
                                        CG-4

-------
     The goal  of the State management assistance grant program under Section 205(g)
is to  encourage  States  to  assume  responsibility  for  management  of  construction
grants and other priority programs with emphasis on early achievement of full dele-
gation of the program.   The  timing and extent of delegation  and financial  support
to each  State  depends  on the  State's  ability  to  operate  a construction  grants
program that meets  statutory  requirements  and EPA policy.  A  grant  is  provided to
a State when it  is  able to  exercise  effective management for a substantial  portion
of the program.

     EPA is working with  all  States  to ensure the maximum  delegation  possible.   A
total of 49 States  (including Puerto Rico) are  expected  to  have  signed delegation
agreements by the end of 1984,  with  36  of  the States fully delegated by that time.
EPA will   continue   to  exercise  project management  responsibilities in  remaining
nondelegated and partially delegated  States and Territories.   EPA  will  also  con-
tinue to maintain Federal  responsibilities for  ensuring effective,  orderly  use  of
construction grant  funds; implement  results-oriented  program management;  ensure
program accountability  1n meeting  statutory  goals;  work with  States  in  meeting
program priorities,  providing  information  transfer  and  guidance as  necessary;  and
work with the U.S.  Army  Corps of Engineers as it fulfills  its program  management,
State training,  and  State management assistance role.

     The goal  of the  water  quality planning grant program under Section  205(j)  is
to support  State, regional,  and  local  planning activities,  including  determining
the nature and  extent of water quality problems; identifying priority water bodies;
identifying cost-effective,  acceptable  means to meet  and  maintain water  quality
standards, including  point-nonpoint  source  control  tradeoffs;   and   identifying
municipal treatment" construction  needs.  States  are  required  to consult  with local,
regional, and interstate  agencies  in  developing work plans  for using  these  funds.

     In accordance  with Congressional  directives,  the  Administrator is  reviewing
all proposed advanced  treatment projects  where  the incremental costs  of the  ad-
vanced component is greater  than $3,000,000.   The  review  of these   projects  is
performed by EPA staff  in Headquarters; the  Regional  offices are  responsible  for
review of similar projects with an incremental  cost of less than  $3,000,000.  This
review ensures  that  such  funding  is  strictly  limited to  those  situations  where the
higher level of  treatment would  result in  significant  water quality  and  public
health improvements.

1984 Program Request

     In 1984, EPA proposes  a construction   grants appropriation of  52,400,000,000,
a decrease of 530,000,000 from 1983.   This  funding level will provide for 597 grant
awards and $2,400,000,000  in net  obligations.   The  Agency  estimates that  outlays
will total  approximately  52,800,000,000.   A  total  of  1,200 projects are expected
to complete  construction.   This   appropriation  will allow   for  new  obligational
authority of 590,797,000  for Section 205{g)  delegation  management  and  $24,407,792
for water quality planning under Section 205(j).

     By the end  of 1984, EPA expects  that the construction grants  program will  have
achieved essentially full delegation.  No additional  States  are expected  to  accept
initial delegation  in  1984,  although  36  States will  assume full   delegation,  an
increase of 6 from 1983.  The remaining States are expected to continue at approxi-
mately the  same  levels  of  delegation  for  the  near future.   In  1984  States  will
provide 2,140 workyears  or  68% of the  total program management staffing, EPA  18%,
and the Corps of Engineers the remaining 14%.

     EPA will continue  its role as overall  program   manager  by working  with States
in targeting funds  toward  priority   water quality  needs;  assuring that proposed
plants are  within each  community's financial  capabilities and have  the capability
for becoming self-sustaining;  completing  and closing  out  projects as  quickly  as
possible; ensuring effective  facilities construction, including improved first year
operations; preventing  waste,  fraud,   or   abuse  and taking   necessary  corrective
action; ensuring that  grants obligations  and outlays projections  are  viable;  and
managing effectively  shared  EPA,  State, and  Corps  of  Engineers  responsibilities.
                                        CG-5

-------
     EPA anticipates that States will obligate 524,400,000  under  Section  205 (j)  in
support of water quality management priorities identified in 1982  and 1983.   States
will review and  revise water quality  standards;  update State  Continuing Planning
Processes; ensure  consistency  between  water quality management  plans and  permit
and construction grants  decisions;  and develop needed  source and nonpoint  source
control programs.

1983 Program

     With a 1983 construction  grants appropriation  of  S2 ,430, 000, .000, a total  of
771 Step 3 and 2+3  grants totaling 53,000,000,000  will  be awarded  in  1983.  A total
of 1,136  projects  are expected  to  complete  construction.   These funds  will  also
support construction qrants management  activities under  Section 205(g) in 49 dele-
gated States with  estimated  obligations of  $107,103,000; water quality management
planning activities in the  States  with estimated obligations of  545,200,000 under
Section 205(j)  and  funding of Marine Combined Sewer Overflow projects.

     EPA expects three  additional  States will accept  initial  delegation in 1983.
Of the  49 jurisdictions  with  delegation  agreements,   30  States  are expected  to
assume full  delegation, an increase  of 9 over 1982.   With the exception of stat-
utory responsibilities for project management, EPA will  exercise  the  role of over-
all program manager in these  States.

     The Agency will work with  States  to define annual  national program priorities
and objectives,  monitor  delegated State programs,   and  provide  needed management
assistance.  The Federal  program will  emphasize  results-oriented  oversight  of  a
limited number of  high  priority  program activities  where  there  are  direct  finan-
cial, water quality, or public health concerns.   EPA will  ensure  that funded proj-
ects meet identified water quality and  public health needs; projects are  technolo-
gically appropriate and within the financial capability of  the comtmnunities  served;
appropriate Advanced Treatment funding  decisions  are made; projects  are  completed
and closed  out as  quickly  as  possible; waste,  fraud, and  mismanagement  in  the
program are prevented;  obligation  and  outlay  projections  are  viable;  and  that
States continue to  implement delegated roles.

     The 545,200,000  to  be   obligated  in  1983   under  Section   205(j)   includes
522,200,000 available  from  1982.  Funding  priorities   will  include   reviewing  and
revising water  Quality  standards  for  use  attainability,   updating   water  quality
management planning processes  and  plans, and  conducting wasteload  allocations  on
priority waterbodies for determining  treatment needs.

1982
     In 1982, construction grants awards totaled 586, including 26  Step  1,  36 Step
2, and 524  Step  2+3  and  Step  3 awards.   This funding  resulted  in 8,346  active
orojects by the  end  of the year. In  1982,  Federal  outlays  totaled $3,756,152,000
and obligations totaled 52,116,800,000.

     During 1982, one  additional State signed a Section 205(g) agreement.   Of the
46 jurisdictions  with  delegation agreements,  21 are  considered to be  fully dele-
gated including  assistance provided  by the Corps  of Engineers.   Delegated  States
obligated 550,131,000  in  1982  to  support  construction grants  and  other  program
needs. States provided  1,901  workyears,^ or 59% of  the total  program.   No  states
obligated Section 205(j) because of  the timing of the  appropriation.  522,200,000
of 1982 funds were reserved for 1983  use,
                                       CG-6

-------
Superfund
   SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
SUPERFUND                                                                   SF-1

   RESEARCH & DEVELOPMENT
       Hazardous Substances	  SF-3
   ENFORCEMENT
       Hazardous Substance Response - Enforcement	  SF-19
          Technical  Support - Office of Legal & Enforcement Counsel..	  SF-22
          Hazardous  Substance Technical  Enforcement......	  SF-23
          Hazardous  Substance Legal Enforcement	  SF-25
   MANAGEMENT & SUPPORT
       Management &  Support.	  SF-2S
          Hazardous  Substance Financial  Management - Headquarters	  SF-33
          Hazardous  Substance Financial  Management- Regions...	  SF-33
          Hazardous  Substance Administrative Management - Headquarters	  SF-34
          Hazardous  Substance Administrative Management - Regions		  SF-35
          Hazardous  Substance Occupational  Health & Safety - Headquarters.  SF-36
          Hazardous  Substance Support Services - Headquarters	  SF-36
          Hazardous  Substance Support Services - Regions	  SF-37
          Hazardous  Substance Laboratories & Facilities	.  SF-38
          Hazardous  Substance Computer Services	  SF-38
          Hazardous  Substance Legal Services - Headquarters	  SF-39
          Hazardous  Substance Legal Services - Regions	  SF-39
          Hazardous  Substance - Inspector General	  SF-40
          Hazardous  Substance Natural Resource Claims....	  SF-41
          Hazardous  Substance - Office of Policy 8 Resource Management....  SF-41
   HAZARDOUS SUBSTANCE RESPONSE ACTIONS
       Hazardous Substance Response - EPA	*	  SF-44
          Hazardous  Spill & Site Response	  SF-45
          Assessing  & Replacing Natural  Resources..	,	.,	  SF-49
       Hazardous Substance Response - Interagency.....	  SF-50
          Department of Health & Human Services	  SF-52
          United States Coast Guard	  SF-52
          Department of Justice	,	  SF-53
          National  Oceanographic & Atmospheric Administration	,	  SF-53
          Deoartment of Interior	  SF-54
       Hazardous Waste Site Inventory	  SF-55
                                       SF-1

-------
                                      SUPERFUND

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
APPROPRIATION
                                (DOLLARS .IN THOUSANDS)
 Hazardous Substance
 Response Trust Fund

TOTAL, Superfund
5180,743.6 5230,000.0 $210,000.0 $310,0.00.0  100,000.0
5180,743.6 S230,000.0 $210,000.0 5310,000.0  100,000,0
PERMANENT WORKYEARS
TOTAL WORKYEARS
OUTLAYS
AUTHORIZATION LEVELS
     465.6      516.4      623.8      619.3       -4.5
     527.7      592.2      699.6      707.1        7.5
 $79,576.0 5188,000.0 5177,000.0 $269,000.0 +5.92,000.0
 By virtue of Appropriation Act, as authorized by
 Public Law 96-510.
                                     SF-2

-------
                                   SUPERFUND


OVERVIEW AND STRATEGY

     In 1984, the major  emphasis  of the  Superfund  program will continue  to  be on
the field implementation of the Comprehensive Environmental Response, Compensation,
and Liability Act (CERCLA)  of 1980.   This law establishes a broad  based  and  inte-
grated program,  involving  both Federal and  State governments, to  address the  en-
vironmental  problems  posed  by  uncontrolled  hazardous  waste  sites  and  spills  of
hazardous materials.  The costs of  implementing CERCLA is funded  by the  Hazardous
Substance Response Trust Fund.  This Fund is  financed by a combination  of excise
taxes levied on  oil  and  chemical  manufacturers and  revenues  from  the General  Fund.
The authority to collect taxes exnires on or before September 30,  1985.

     The primary goal  of the  Environmental  Protection Agency's  Superfund program
is to effectively respond  to the  release  or threatened release of  hazardous  sub-
stances, pollutants,  or  contaminants that may  present an imminent  or substantial
endangerment to public health, welfare, or the  environment. The two  basic types of
responses that  can   be  taken are  removal  and  remedial  actions.    Removal  actions
are generally  short-term responses  taken to  abate  an immediate  threat  posed  by
the uncontrolled  release of  hazardous  substances at  both sites  and  spills  into
the air, land,  and   water  media.    Remedial  actions involve  longer term  and  more
complex solutions at hazardous waste sites.

     While the Agency has the primary  responsibility  for  implementing the program,
CERCLA Drov'des a clear  mandate for the  Agency  to  work closely with  a  variety of
other Federal agencies and the States in  order  to carry out  the Act.  The National
Contingency Plan provides  the basic  framework for implementing  the program 1n  a
timely and effective fashion. The Agency  undertakes   five major  activities in  im-
plementing the  Superfund program: Hazardous  Substance Response,   Enforcement,  Re-
search and Development,  Management  and  Support,  and Interagency  Support.   The
effective integration  of these  activities  will  involve  close cooperation  among
various Agency offices,  the States and other Federal  agencies  with specific program
responsibilities.

Hazardous Substance   Response

     In 1984, Hazardous  Substance  Response  activities financed  by  the  Hazardous
Substance Response  Trust Fund  will   be  focused  on the  containment  of   the  most
serious hazardous waste emergencies  and the continuation and initiation of remedial
actions at uncontrolled  sites posing the greatest threat  to public  health and the
environment.   In 1984,  the  Agency will  continue its   systematic evaluation  of  all
known uncontrolled  waste sites to  determine  which  pose  a  significant  threat to
public health, welfare,  or the environment.   As  required by CERCLA,  the National
Priority List  has  been  prepared  to  provide  a basis  for determining  priorities
for response and enforcement efforts.   In order to make the best  use  of  available
resources, before any Federally sponsored remedial action is initiated, a concerted
effort will  be made  to have  responsible parties  assume the cost of response.   When
this fails,  the  Agency  will  proceed  to  characterize the  problem,  identify  and
analyze feasible solutions, and then design and implement the selected alternative.
By the  end  of 1984,  the Agency expects  to have initiated planning  efforts at  ap-
proximately 130-140   sites  and begun the  design  or implementation of  solutions at
approximately 75 sites.

     In 1984, the Agency will continue to work closely with the  States  in select-
ing and implementing solutions at  hazardous waste sites.  States will be encouraged
to accept management of  all  response actions when capable.  For  those sites  where
the States do not accept the lead for management of the  response,  the Agency will
contract for the  necessary  expertise  to  conduct 'the  assessment  of  and  selection
of alternatives and   the Army Corps of Engineers will  manage design and construction
contracts to implement the solution.

-------
     The Agency  will  continue  to  ensure an  effective emergency  resoonse  program
for any  major  hazardous substance spills and for emergency  releases  at hazardous
waste sites.   Approximately  4,000 hazardous  material  spills and  site emergencies
occur each  year.   The Federal  government will  need,  as in  the past,  to  respond
directly at  only a  small  number  of these  incidents.  Maintenance  of a  Federal
canability to  respond  directly to  certain  incidents  is  absolutely  crucial  for
those situations  when  the  party "responsible  is  either  unknown  or   incapable  of
oroperly handling the  response and the  State and local governments are unable  to
provide adequate response.  The Agency will  work  closely  with the U.S. Coast'Guard
and other members of the National  and Regional  Response  Team,  as well as the States,
to provide  timely  and effective  response in  those  situations  where  it is  truly
necessary.

Enforcement

     The Hazardous Substance  Response Trust Fund  is  insufficient to support clean-
up of all  problem  sites and spills.   The Agency's enforcement  program will  empha-
size securing  privately-financed  response  actions  through  negotiated  settlement
or administrative and legal action and will initiate cost  recovery whenever possi-
ble.  These  efforts  will  expand  the program's  ability  to address  uncontrolled
waste sites.

     The Agency's enforcement efforts will  focus  on  the development of legally and
technically sound cases.   Those responsible for uncontrolled sites or spills  will
be given  an early opportunity  to reach  a  settlement  and  voluntarily  assume  the
cost of  responding.   However,  the  Agency will continue to  initiate adnrinistrative
and legal actions against  those parties  who  fail  to negotiate in  good  faith.   In
addition, in those  cases  where  a Fund-financed  response  action is  undertaken,
the Aaency will seek to recover the cost of resoonding.  If appropriate, the Agency
nay seek to impose the treble damage provisions of CERCLA.

Research and Development

     The Superfund Research  and Development  program supports the  Agency,  States,
and industry in resolving  those  technical  problems which inhibit the  ef-fective
implementation  of removal and  remedial actions.  The Office of Research and Devel-
opment supoort  for Agency  Superfund  activities focuses on  adopting existing tech-
nologies and  scientific  information   for  application  to  uncontrolled  hazardous
waste site  situations.   For instance, current technologies  used  in the construc-
tion industry,   wastewater  treatment,  and  soil!  cleanup,   may  be applicable  to
uncontrolled waste sites.  However, before  these technologies can be  applied,  they
must first  be  tested, their cost-effectiveness determined, and limitations under-
stood.   In  addition,  field response personnel must be in  a position  to  identify
rapidly and measure accurately  the hazardous  waste with which  they are confronted
and determine  quickly the  risk Involved to  the  surrounding population and  eco-
system.

     Superfund activities  of  the  Office of  Research  and  Development  are  system-
atically designed to  provide  the following  in support  of the Agency's programfsh
methods for  sampling  and analyzing hazardous materials needed  for quality assur-
ance protocols;  techniques  for  field   response  personnel   to   use  1n  evaluating
potential ecological . effects   of hazardous' materials   releases  from   waste  sites;
characterization of hazardous materials through the  use of  remote monitoring tech-
niques; evaluation of the hazard potential of substances released from uncontrolled
sites; and  engineering  and other  technical  guidance to  Federal, State  and  local
officials for "immediate response to uncontrolled site cleanup operations.
                                        SF-4

-------
Management and Support

     Management and  Support  activities for the Superfund  program  provide the full
array of  financial,  administrative,  and  support  services  in  an  integrated  and
efficient manner.   The  five  major  activities conducted  to  supply  basic  Agency
management and support  are  provision  of administrative services, financial manage-
ment, policy and resource management, and the services of the Offices of the Inspec-
tor General and General Counsel.

     Administrative services  include  personnel  management,  contracts  management,
data systems  management,  and  occupational  health and  safety.  Also  included  are
funds necessary for facility rental. Federal Telecommunications Service, utilities,
local telephone costs, and other support costs.

     Financial management activities include the maintenance of systems, procedures,
and records that  accurately  reflect the financial condition of  the Fund, and pro-
vide full accounting of all  receipts and disbursements and site specific accounting
to document cost recovery.

     Policy and  resource  management  activities  support  program  implementation
through:  statistical, technical, economic,  and financial  analyses of regulations,
guidelines, policies,  and program  activities; the development  and implementation
of management tracking and accountability systems;  and, budget  preparation, control,
execution, and evaluation.

     The Agency's  Office  of  Inspector  General   is   responsible   for  determining
whether or  not  the  Fund is  being  properly  administered;  preparing  interim  and
final Reports  to  the  Congress; and   conducting,  supervising,   and  coordinating
pre-award, interim, and  final  audits  of Superfund contracts and interagency agree-
ments.

     The Agency's  Office of  General  Counsel  supports  the  Superfund  program  by
providing advice  and   consultation  on  financial  and  administrative  matters  such
as eligible  uses  of  the  Fund and  legal  support  for the development  and defense
of regulations.   The  General  Counsel  also  provides  advice  to  Superfund managers
and States  on Cooperative  Agreements  with State  agencies  to  manage  removal  or
remedial work,  and  for  defensive   litigation arising  out   of  Agency   Superfund
decisions.

Interagency Support

     In addition  to  requiring  integration   of the efforts  of the  various  Agency
offices with  program  responsibilities,  the Superfund program requires  close  co-
operation among  various Federal  agencies.   Executive Order  12316, signed  by  the
President in  August  1981,  requires  that  the Agency assume  responsibility for the
management of  the program.    In  addition,   several   other  agencies  including  the
Departments of Justice, Health  and  Human  Services,  Transportation,  Commerce,  and
Interior, as well as, the Federal Emergency Management Agency were  assigned respon-
sibilities under CERCLA and  the  Executive  Order.  To  ensure  a coordinated Federal
program, the  Agency  will emphasize  the development  of  an integrated  approach  in
undertaking site  response actions.   Activities  at   specific  sites  undertaken  by
other Federal agencies  will  be  triggered at  the  request  of the  lead  Agency's  on-
scene personnel  and  will   be  funded  through  reimbursable  agreements.   On-going
activities of  other  Federal  agencies are determined  jointly  under the interagency
budget process established  in  the  Executive Order and are funded through transfer
allocation accounts.   The dual   system ensures  that agencies  have sufficient funds
to conduct  on-going activities  while  providing  the  lead Agency the  ability  to
manage and coordinate  Federal actions at specific sites.
                                       SF-5

-------
                                         SUPERFUNn

                                         Budget     Current                 Increase  +
                                Actual   Estimate   Estimate   Estimated    Decrease  -
Program Activities              1982 =	   1983       1983       19841933  vs1984
 Hazardous Substance              50        50         50          50             0
   Spills and Sites -
   Immediate Removal Actions
 Hazardous Substance -Sites -
   Planned Removal Actions         1        30         15          10           -  5
Remedial Actions
 Preliminary Assessments       1,500     2,000      4,000      4,000             0
 Inspections                   1,300       500      3,000      2,000             0
 Investigations                  400       100        200         200             0
 Remedial Investigation/
   Feasibility Studies            31        56         40          55         + 15
 Initial Remedial Measures*       12        -          15          20         +5
 designs                           8        20         24          40         + 16
 Remedial Actions                 14        11         11          22         + 11
Enforcement Activities
 Technical Support for
   On-going Docket/Filed          42        -          25          40         + 15
   Cases
 Settlements                      20                   36          50         + 14
 Enforcement of Administrative    -         -          17          32         +15
   Orders
 CERCLA §106 Imminent Hazard
   Civil Litigation Case           q        _           7          10         +3
   Support
 CF.RCLA §107 Cost Recovery
   Civil Litigation Case          18        -          14          24         + 10
   Support
 State Support Activities         17                   30          30             0

 •Initial remedial measures involve limited actions, if necessary, such as  drum  excava-
  tion required to continue work on remedial investigation/feasibility study or  design.
                                         SF-6

-------
Research and
Development
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY
                               1984 Budget Estimate
                                Table of Contents
                                                                            Page
SUPERFUND
    RESEARCH & DEVELOPMENT
       Hazardous Substances,...	  SF-8
                                       SF-7

-------
                                      SUPERFUND

                                 Hazardous Substances

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE  +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE  -
                                           1983       1983             1984 YS  1983
                                (DOLLARS IN THOUSANDS)

PROGRAM
Scientific Assessment
 Hazardous Substance             $459.9     $614.2     $614.2     $794.0     $179.8
 Response Trust Fund
                       TOTAL     $459.9     $614.2     $614.2     $794.0     $179.8

Monitoring Systems &
Quality Assurance
 Hazardous Substance           $2,785.9   $1,989.9   $1,989.9   $2,905.9     $916.0
 Response Trust Fund
                       TOTAL   $2,785.9   $1,989.9   $1,989.9   $2,905.9     $916.0

Environmental Engineering
& Technology
 Hazardous Substance           59,809.5   $3,499.4   S3,499.4   $2,221.3  -$1,278.1
 Response Trust Fund
                       TOTAL   $9,809.5   $3,499.4   $3,499.4   $2,221.3  -$1,278.1

Environmental Processes
& Effects
 Hazardous Substance             $757.9     $232.5     $232.5     S459.5     $227.0
 Response Trust Fund
                       TOTAL     $757.9     $232.5     S232.5     $459.5     $227.0

TOTAL:
 Hazardous Substance          S13.813.2   S6,336.0   $6,336.0   $6,380.7      $44.7
 Response Trust Fund

Hazardous Substances   TOTAL  $13,813.2   $6,336.0   $6,336.0   $6,380.7      $44.7


PERMANENT WORKYEARS
Scientific Assessment               3.8        2.5        2.5        2.5

Monitoring Systems &                8.6        8.4        8.4        8.4
Quality Assurance

Environmental Engineering          11.8   ,    11.5       11.5       11.5
& Technology

Environmental Processes             1.9        2.1        2.1        2.1
& Effects

TOTAL PERMANENT WORKYEARS          26.1       24.5       24.5       24.5
                                        SF-8

-------
Qua! ity Assurance
Environmental Engineering
& Technology
Environmental Processes
& Effects
TOTAL WORKYEARS
                                      SUPERFUND
                                 Hazardous Substances
                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

TOTAL WORKYEARS
Scientific Assessment
Monitoring Systems &
(DOLLARS IN THOUSANDS)

3.8 2.5 2.5 2.5
8.6 8.4 8.4 8.4
11.8
 1.9

26.1
11.5

 2.1

24.5
11.5

 2.1
24.5
11.5

 2.1

24.5
                                        SF.-9

-------
                                     SUPERFUND


                                Hazardous Substances


                                                              Current
                                                   Actual      Estimate      Estimate
Major Outputs/Milestones                            1982        1983          1984

Provide Techniques and Procedures for
Site and Situation Assessment

-  Develop methods for assessing health             9/82        9/83          9/84
   effects and exposure to complex wastes.
   (Scientific Assessment)

-  Prepare risk assessments for use in remedial      Ongoing    Ongoing       Ongoing
   and enforcement actions.(Scientific Assessment)

-  Guidelines for sampling and emergency            9/82        9/83          9/84
   response. (Monitoring)

-  Laboratory on-site evaluations and               Ongoing    Ongoing       Ongoing
   aerial photo studies. (Monitoring)

-  Provide Superfund field procedure docu-           9/83        9/83          9/84
   ntents to aid response teams in assessing
   and cleaning up uncontrolled sites.
   (Env. Processes)

Evaluate Technologies to Manage Uncontrolled
Waste Sites

-  Mobile incinerator construction, testing and     6/83        9/84          9/84
   demonstration. {Env. Eng.)

-  Handbooks for decontamination procedures,        1/84        9/84          9/84
   cover design and Installation, slurry trench
   design and installation. {Env. Eng.)

-  Handbooks for fixation/solidification of         12/83        8/85          8/85
   wastes, design and performance of liner
   materials and evaluation of organic chemicals
   on cutoff wall performance. (Env. Eng.)

Provide Information for Personnel Health and
Safety Equipment and Procedures

-  Develop interim and final  diver safety           8/84
   protocol. {Env. Eng.)

Support Reportable Quantities Regulatory Ef flirts

-  Monitoring guidelines. (Monitoring)                          9/83          9/84

-  Develop criteria "reportable quantities" (RQs)   9/82        9/83          9/84
   and for chemicals listed in CERCLA, Sections
   101(14) and 102. (Scientific Assessment)
                                          SF-10

-------
                                        SUPERFUND


                                  Hazardous Substances


Budget Request

     The Agency requests  a total  of  $6,380,700 and  24.5  permanent workyears  for
1984, an increase of  $44,700.   Within this level, there is a decrease  in  environ-
mental engineering  and technology  and  increases  in  the   other  program  elements
which comprise this  sub-activity.

Program Description

     Unsound hazardous  waste  management  practices  in  the   United  States  have
resulted in  large  numbers  of  uncontrolled  sites, many  now  abandoned,  that  are
causing contamination of the environment.

     The support afforded by the Office of Research and Development (ORD)  is almost
entirely a technical  support function through which ORD uses completed  research  or
developments from other programs  such  as  Hazardous  Waste, Hazardous  Spills  and
Prinking Water  to  provide  the  support  necessary  for   program  implementation.
Carefully tailored guidance  documents,  operations manuals, assessment  techniques,
evaluation of control  technologies and  general  technical  assistance are  provided
to meet the  requirements  of  EPA program  and  regional  offices,  States and  local
authorities.  Specific program objectives established as the basis  for  ORD  support
activities are:

     Objective 1.   Provide Techniques and Procedures for Site  and  Situation Assess-
ment.  Activitiesunder this  objective provide  the necessary  techniques and proce-
dures to  allow  On-Scene Coordinators  (OSC)  to  quickly and effectively assess  the
degree of hazard posed at specific uncontrolled  hazardous waste sites.  An extensive
quality assurance program for  the National  Contracts  Program is   also  included.

     Objective 2.   Evaluate  Technologies to  Manage Uncontrolled  Waste  Sites.   Ac-
tivities under this  objective evaluate and assess technologies,  techniques and con-
struction materials  which may be  applicable  to controlling hazardous waste incidents
in a cost-effective  manner.

     Objective 3.   Provide Procedures for Assuring Effective Ppst-Closure of ^neon-
trolled Sites.These activities provide the means to accurately monitor and ensure
adequate control during the post-closure phase of site cleanup.

     Objective 4.   Provide Information on Personnel Health and Safety Equipment and
Procedures.  These activities evaluate and assess the technical areas  necessary to
ensure personnel health and  safety during removal and  cleanup  operations,  includ-
ing the  evaluation  and  assessment  of:  communications equipment  and  procedures,
protective clothing  and  breathing apparatus,  personal monitoring for  exposure,
safety procedures for  extended  site'  operations, and  decontamination procedures  of
personnel and equipment exposed to hazardous materials.

     Objective 5.   Support Reportable Quantities Regulatory Efforts.  These  activ-
ities support  Superfundregulatory  efforts  by ranking  and  assigning reportable
quantities to  chemicals  based upon a  number of  scientific and technical  factors,
including chronic mammalian toxicity or potential carcinogem'city.

     Objectives.   Provide Technical  Support  to Enforcement,  Program and Regional
Offic₯iTThese activities provide verification  of  remedial  action  design and imple-
mentation, review and  evaluation of all  QA/QC  plans, review of  new data submitted
by liable parties, and provide expert witnesses when required  for  litigation proce-
dures.
                                          SF-n

-------
SCIENTIFIC ASSESSMENT

1984 Program Request

     The Agency requests  a  total  of $794,000 and 2.5  permanent workyears for this
program, all of which is for the Hazardous Substance Response Trust Fund appropria-
tion.  This  represents  an increase of $179,830  in  total  funding and no  change in
workyears, reflecting  the  Agency's  increased   need   for  emergency  response  and
enforcement support.

     Provide  Techniques  and  Procedures  for   Site   and  Situation  Assessment..
Rapid response health assessments  will  be provided to On-Scene-Coordinators (OSCs)
for use in deciding appropriate response to emergency situations. These assessments
are chemical-specific but when  sunned over the  chemicals involved  will  allow OSCs
at a  spill  or uncontrolled  site to  determine  potential  hazards and the  need for
more detailed  assessments.   Also,  methods for  preparing  detailed assessments  of
human health  effects  and exposure to complex  hazardous  wastes  are  being refined.
Additional factors  will  be considered  in formulating more  comprehensive versions
of methods developed in 1983.

     Provide Procedures for  Ensuring Effective Post-Closure of Uncontrolled Sites.
Site-speeific and  chemical-specific detailed risk assessments  will  be  prepared to
verify the long-term adequacy of Agency  sponsored remedial,  enforcement and volun-
tary compliance actions.  Since  residual  levels  of  hazardous substances may remain
in the environment  after  remedial  responses, protocols are  also being developed to
estimate aggregate  acceptability  indices  from  exposure  to  these  levels.   This
effort will  help  address the  issue of  "how  clean  is clean"  from a  human health
standpoint.

     SuppprtReportable Quantities Regulatory Efforts.  Chemical-specific  criteria
were developed in  1982  and  1983 to determine minimum "reportable quantities" (RQs)
for each chemical listed  or  specified under CERCLA, Sections 101(14) and 102 based
upon their  inherent health  hazard.  Approximately  50 to  70   reportable quantity
determinations required under  Section 102 will  still  remain  to be completed in
1984 (all  of those under Section  101  will be  completed  earlier).   Resources also
will be  required  to respond to  public  comments  during  rulemaking  for all  of the
chemicals in both sections.

1983 Program

     In 1983, the Agency  is  allocating a  total  of $614,200 and 2.5  permanent work-
years for  this program,  all  of which is funded under the Hazardous  Substance Re-
sponse Trust Fund appropriation.

     Provide Techniques and Procedures for Site and Situation Assessment.  Toxicity
data are  being  compiled  and  summarized for 100  additional  chemicals  1n order to
respond rapidly to requests from OSCs at emergency sites.  First generation methods
for evaluating  human  health  hazards  resulting  from multiple  media  exposure to
chemical mixtures are being  completed and  compiled  in the form of a technical  sup-
port document,

     Provide Procedures for  Ensuring Effective Post-Closure of Uncontrolled Sites.
Chemical-specific and site-specific hazard/risk assessments are  being  provided to
identify potential  acute  and chronic  human health hazards  arising from multi-media
exposures to  complex mixtures  and  single  chemicals found in  past  remedial  situa-
tions.  These assessments  vary  in  depth  of  coverage,  ranging from brief  hazard
summary statements  to  full  peer  reviewed risk  assessments  for use  in litigation
or negotiation.

     Support Reportable Quantities Regulatory Efforts.  Chemical-specific  criteria
for determining  reportable  quantities are being  finalized and applied  to approxi-
mately 75 chemicals among those designated under CERCLA Section 101(14).
                                         SF-12

-------
1983 Explanation of Changes From Budget Estimate

     These was no change to this program.

1982 Accomplishments

     In 1982, the  Agency obligated  a  total  of 5459,900  for this program, all  of
which was under the Hazardous Substance Response Trust Fund appropriation.

     Provide Techniques and Procedures for Site and Situation Assessment.   Toxicity
data were compiled  and summarizedfor  60chemicals, and 20  rapid  response  health
assessments were provided  upon  request  from  regional  and program  staff.   Methods
for determining human health effects from multiple media exposure and single chemi-
cals were completed and  summarized  in the  form  of a draft report now under review.

     Provide Procedures  for Ensuring Effective Post-Closure of Uncontrolled Sites.
A total of six detailed human health risk assessments were completed in 1982 as part
of this program.

     Support  Reportable  Quantities Regulatory Efforts.  Preliminary  criteria  for
determining reportable  quantities  were  developed  and  applied to approximately  75
chemicals listed in CERCLA, Section 101(14).

MONITORING SYSTEMS AND QUALITY ASSURANCE

1984 Program Request

     The Agency requests a total of $2,905,900 and 8.4 permanent workyears  for this
program, all  of  which  is  for the  Hazardous Substance Response Trust Fund  appropri-
ation.  This  reflects  an  increase  of  5916,000,  resulting  in  a strengthening  of
efforts to provide an effective  quality  assurance  program  in  support of the National
Contracts Laboratory Program.   The  increase  also reflects the  anticipated  growth
of sample analyses  from waste  sites and  an  increase  in  the number  of  settlement
agreements from enforcement actions.

     Provide Techniques  and  Procedures for Site and Situation Assessment. - It  is
anticipated that some  12-1b  contractors  win  be involved  in  the National  Contracts
Laboratory Program in 1984.  On-site laboratory evaluations,  blind sample  analyses,
quarterly reviews and a 10  percent data  audit  will be provided in order to  establish
data of known quality  throughout  the site  analysis program.   The site analysis and
prioritization program  will  use historical and new aerial  photography to provide
more than  500  site  studies.   A  second  edition  of the  "Compendium of  Sampling
Methods" will be published to provide the latest methods to States  and  industry.

     Support Reportable Quantities Regulatory Efforts.  The  Reportable Quantities
Regulations under provision  of  Superfund Sections 101(14) and  102  will be updated
and strengthened by adding monitoring methods for new chemicals.

     Provide  Technical  Support  to  Enforcement,  Program  and  Regional  Offices.
Enforcement cases  wilt be  provided with  increased  monitoring expertise  for case
preparation.  Quality assurance and quality control efforts to ensure that clean-up
by industry is consistent with agreements will receive direct ORD support.   Support
will be available  to  program offices and Regions in the  form  of geophysical  moni-
toring to ensure that  removal and  remedial  actions have been successful  in abating
pollution.  A referee  laboratory to  analyze  split  samples  from  field monitoring
and provide quick  turn around analyses of complex  samples will  be provided to the
Regions along  with special  studies in  air,   water, soils  and biota  monitoring.

1983 Program

     In 1983, the  Agency  is allocating a total   of'SI ,989,900 and  8.4  permanent
workyears to  this  program,  all  of which is under the  Hazardous Substance  Response
Trust Fund appropriation.
                                          SF-13

-------
     Provide  Techniques  and Procedures for Site and Situation Assessment.   A more
encompassing and  effective  quality  assurance  program for  the NationalContracts
Laboratory Program is being  implemented in order to  obtain data  of  known quality.
The first edition of a "Compendium of Sampling Methods" and "Guidelines On Response
to Emergencies"  is  being  completed.   Historical  and  new  aerial  photography  is
being used to characterize site conditions.

     Support Reportable Quantities Regulatory Efforts.  A  compendium of  available
monitoring methods for  ambient and  emergency  monitoring of  reportable quantities
is being provided to support Superfund Sections 101(14) and 102,

     Provide  Technical   Support  to  Enforcement, Program and Regional  Offices.  A
contractor-operated laboratory  is  providing referee analysis  capabilities,sample
analysis for enforcement and analysis of  complex  samples  for the  Regions.  Quality
assurance oversight of enforcement settlement agreements is being  initiated.  Field
testing of equipment  for  volatile organic air problems and water, soils  and biota
monitoring is being supplied to Agency and operational State programs.  Enforcement
support for case preparation is using state-of-the-art equipment and the scientific
expertise of the Office of Research and Development.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982, the Agency  obligated a total of $2,785,900  for this program,  all  of
which was under the Hazardous Substance Response Trust Fund appropriation.

     Provide Techniques and Procedures for Site and Situation Assessment.  The first
phase of a quality assurance program for the National Contracts Laboratory Program
and mandatory quality assurance program was implemented.  Evaluation  and standardi-
zation of sampling and analysis methods, and the development of a personal exposure
monitor were completed.  An extensive program to characterize 100  sites with aerial
photography was accomplished.

     Provide Technical Support to Enforcement,  Program and Regional  Offices.  Sup-
port in the form of special  studies  on air, surface and ground water and oversight
of a contractor-operated laboratory  for the analysis  of  complex field samples were
provided.

ENVIRONMENTAL ENGINEERING AND TECHNOLOGY

1984 Program Request

     The Agency  requests  a  total  of $2,221,300   and  11.5 permanent  workyears for
this program, all of which is for  the Hazardous Substance Response Trust Fund appro-
priation.  This  decrease  of  $1,278,100   reflects  the  near   completion  of  major
engineering studies associated  with  the development  of manuals required to support
initial Superfund implementation efforts.

     Evaluate Technologies to Manage Uncontrolled Haste Sites.  Response technology
to support  emergency  action  at  hazardous  materials  spills  and  newly discovered
releases of hazardous materials from uncontrolled waste  sites will  be evaluated.
Efforts will address response equipment  and  technology by demonstrating prototypical
equipment such as mobile  incineration systems and mobile  soil  washing  systems for
cost-effective multi-media removal actions at uncontrolled sites.   Manuals of prac-
tice for handling damaged and leaking drums at waste  sites  will be made available.
A scientifically defensible technology base (including guidelines) will  be prepared
to provide response personnel direction on the use of dispersants and/or coagulants
introduced into  the   environment  to  mitigate  the- effects  of  hazardous  releases.
                                         SF-14

-------
     Remedial technology  activities  will  address  the  engineering  and technology
needs of  the program  office  and  Regions  relative  to  cleaning  up  problems  at
abandoned waste  sites.   Assessing the  cost-effectiveness of  technologies  applied
and validation of technology effectiveness will be an integral part of this effort.
A handbook on remedial  technology will be  prepared,  based  on a survey and assessment
of current  technology  and  field assessments  of  remedial actions  at uncontrolled
hazardous waste  sites  begun in  1982.   It will  include design data, and  cost and
effectiveness information to assist in selecting remedial action alternatives. Pre-
dictive capabilities characterizing reactivity of construction materials and hazard-
ous wastes will  be provided. Models to  predict the  effectiveness of remedial action
will also be provided.

     Provide Information  on  Personnel  Health and Safety'Equipment and Procedures.
Based on our experience" at T)az"ardou"s~waste sites, there is ~i need to evaTuatl^ spec-
ialized equipment and establish  current state-of-the-art procedures to ensure per-
sonnel safety during  reconnaissance  and  cleanup,  especially decontamination  of
equipment and personnel.   Outputs in this  area will include  manuals establishing
personnel safety protocols  and the evaluation of equipment and techniques specific
to the needs of response personnel.

     Provide Technical Support  to  Enforcement,  Program and Regional Offices.  In
order to provide timely technical and scientific information and analysis iri support
of hazardous waste  site  litigation  and  corrective actions, short-term, quick turn-
around technical advice and consultation  will be provided to regional programs and
to the Office of Waste Program Enforcement,

1983 Program

     In 1983, the  Agency  is  allocating a  total  of $3,499,400 and  11.5 permanent
workyears for this program,  all  of  which  is under the Hazardous  Substance Response
Trust Fund appropriation.

     Evaluate Technologies  to  Manage Uncontrolled Waste Sites.  Major  activities
include evaluation of prototypical equipment  for cost-effective multi-media removal
actions at  spills  and defective uncontrolled  hazardous waste  sites;  production of
manuals addressing  on-site assessment of  the extent  of contamination,  containment
and confinement techniques  for  removal  actions;  and manuals addressing separation,
concentration of  released  hazardous  chemicals, and ultimate  disposal  of collected
and concentrated cleanup  residuals.   A  survey and assessment  of current technology
applicable to remedial actions  at uncontrolled hazardous  waste sites is also being
prepared.

     Remedial action design sites analyses are being conducted and reports on pilot
test facilities to predict  the effectiveness  of  remedial  action   schemes are being
prepared.  Under this effort reports will be  initiated on the prediction of reacti-
vity of construction materials with hazardous wastes.  Technical resource documents
describing best engineering judgement practices for user communities In controlling
pollutant release from uncontrolled waste sites are being prepared.

     Provide Information on Personne'lHealth  and Safety Equipment and Procedures.
This programisproviding manuals onthetesting of specialized  safety equipment
and procedures for ensuring personnel safety  during site  reconnaissance and cleanup
including decontamination  of equipment and  personnel.   Emphasis  is  on evaluating
equipment and techniques  specific to  the needs  of  response  personnel,  including
people engaged in sampling  and site investigation.

     Provi de Technicaj Support to  Enforceinent,^  Program and Regi onal Off1 ces_.  The
program is  provrtinlj quickturn-a'rolimi,  shb'rt-terjif technical''suppbl"F  tcf "uERR and
regional offices in reviewing response plans for  uncontrolled  hazardous waste sites,
enforcement cases, and control  technology.   Support  is  being  provided  by in-house
ORD technical experts  and  through ORD  contractors!  Response  field assistance is
continuing, including on-site consultation,  supervision  of cleanup operations invol-
ving ORD equipment,  and  analytical  support using mobile  and  central  laboratories.
                                        SF-15

-------
1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1J82 Accomplishments

     In 1982, the Agency  obligated a total of  $9,809,500  for this  program,  all  of
which was under the Hazardous Substance Response Trust Fund appropriation.

     Evaluate Technologies to Manage Uncontrolled Waste Sites.  Since the Office of
Research and Development's activitiesinsupport of CERClA  began in  1981, only those
outputs with a short period of performance were completed in 1982.  Major accomplish-
ments resulted in improved engineering  technology to correct environmentally unsound
hazardous waste sites.  Construction of a mobile incinerator designed for field use
in destroying hazardous  organic substances collected from cleanup operations was
completed.  In order to systematically evaluate and demonstrate the equipment, test
and trial burns  were begun and  will  be completed in early 1983.   A technical gap
was filled  by  providing technology (ultrasonic  ref 1 ectometer)  to locate insoluble
hazardous wastes (sinkers) at the  bottom  of waterbodies.   A computerized data base
providing a  centralized  information  bank  of  past  hazardous  substances  incident
response experiences has been developed.  Information from  regional  offices. States,
and localities  are  being added  to the  system  to  increase  its comprehensiveness.

     A number of tasks initiated in both 1982 and prior years produced reports, e.g.,
"Handbook -  Remedial  Action  at Waste Disposal  Sites,"  "Costs of  Remedial  Response
Actions at  Uncontrolled  Hazardous Waste  Sites,"  and "In-Situ Stabilization Case
Study."  Other  activities included completion  of  a  study on  in-situ  destruction
of PCS's  In  contaminated  soils.   Several   technical   handbooks  were  initiated,
addressing such subjects  as  slurry trench design,  plume control,  and.cover design.

     Prpv i de I nformati on  on P ersonnejHeal tn  and Safety Equipment   and  Procedures •
Activities; supporting this  objectiverwerei riot  initiated until  the  end  of 1982 and
as a result, there were no products produced  during that year.

     Provide Technical Support to  Enforcement,  Program an
-------
     Provide Technical Support to Enforcement, Program and  Regional Offices. Tech-
.nical support  will  coritinueto  be  provided  to  enforcement,  program  and  regional
offices on an  "as  requested"  basis.  In addition to predictive models and manuals,
field and enforcement  personnel  have  a continuing need for technical  support  on a
short term basis to address site-specific problems.

1983 Accomplishments

     In 1983, the Agency  is allocating  a total  of $232,500  and  2.1  permanent work-
years to this program, all of which is under the Hazardous Substance Response Trust
Fund appropriation.

     Provide Techniques and Procedures for Site and Situation Assessment.  The pro-
gram continues to  focus  on preparation and  validation of user  oriented .materials
to aid regional and State response team personnel.  A set of manuals are being com-
pleted which  assist OSCs  in   identifying  ecological,  biological,  geohydrological
and economic  factors   germane  to responding  to  releases  of hazardous  materials.
Models to predict the behavior of contaminants in  ground and surface water are being
developed and selected for use.   These will assist response team personnel in asses*
sing the risks posed at uncontrolled hazardous waste sites.

     Provide Technical Support to  Enforcement,  program and Regional Offices.   The
program provides field and  enforcement  personnel  with technical  expertise  in   re-
sponse to site or situation-specific,  needs and requests.   Products include consul-
tations, supervision, testimony and analytic support.

1983 Explanation of Change from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982 the Agency obligated a total  of  5757,900 and  1.9  permanent workyears
for this program, all   of  which  was  under the  Hazardous-Substance Trust Fund appro-
priation.

     Provide Techniques and Procedures  for  Site and Situation Assessment.  Drafts
of user manuals were prepared  for the  land and ground  water media and were distri-
buted for peer  review  to  response team personnel.   Efforts continued to develop a
user manual  for surface-water assessments.

     Provide Technical Support to  Enforcement,  Program and RegionalOffices.   The
program provided field  and  enforcement personnel  with technicalexpertise  in  re-
sponse to site  or  situation-specific  needs  and  requests.  Products  included  con-
sultations,  supervision, testimony and analytic support.
                                          SF-17

-------
Page Intentionally Blank

-------
Enforcement
    SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
SUPERFUND
    ENFORCEMENT
       Hazardous Substance Response - Enforcement	. t	  SF-19
          Technical Support - Office of Legal & Enforcement Counsel	  SF-22
          Hazardous Substance Technical Enforcement	  SF-23
          Hazardous Substance Legal Enforcement	  SF-25
                                      SF-18

-------
                                      SUPERFUND

                      Hazardous Substance Response - Enforcement

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +•
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Technical Support -
Office of Legal  &
Enforcement Counsel
 Hazardous Substance           $1,564.9   $2,346.2   $3,346.2     $964.5  -51,381.7
 Response Trust Fund
                       TOTAL   $1,564.9   52,346.2   52,346.2     5964.5  -51,381.7

Hazardous Substance
Technical Enforcement
 Hazardous Substance           $6,581.7   $9,219.7   $8,74.5.6  $17,512.8   58,767.2
 Response Trust Fund
                       TOTAL   56,581.7   $9,219.7   58,74.5.6  $17,512.8   58,767.2

Hazardous Substance
Legal Enforcement
 Hazardous Substance             5263.0   53,762.6   53,534.4   $3,628.7      S94.3
 Response Trust Fund
                       TOTAL     5263.0   53,762.6   53,534.4   53,628.7      594.3

TOTAL:
 Hazardous Substance           58,409.6  515,328.5  $14,626.2  $22,106,0   57,479.8
 Response Trust Fund

Hazardous Substance    TOTAL   58,40.9.6  S.15,328.5  $.14,626.2  $22,106.0   57,479.8
Response .- Enforcement


PERMANENT WORKYEARS
Technical Support -                1-9.7       15.0       15.0       12.0       -3.0
Office of Legal &
Enforcement Counsel

Hazardous Substance               12.1.2       84.9      117.9      120.6        .2.7
Technical Enforcement

Hazardous Substance                 4.1       66.0       79.4       73.9       -5.5
Legal Enforcement

TOTAL PERMANENT WORKYEARS         145.0      165.9      212.3      206.5       -5.8


TOTAL WORKYEARS
Technical Support -                20.8       19.0       19.0       14.0       -5.0
Office of Legal &
Enforcement Counsel
                                        SF-19

-------
                                      SUPERFUND

                      Hazardous Substance Response - Enforcement

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
Hazardous Substance
Technical Enforcement

Hazardous Substance
Legal Enforcement

TOTAL WORKYEARS
(DOLLARS IN THOUSANDS)

  137.8       99.3       132.3       140.0
7.7
    5.1        71.9       85.3       82.5        -2.8


  163.7       190.2      236.6       236.5         -.1

-------
                                     SUPERFUND


                      Hazardous Substance Response-Enforcement


Budget Request

     The Agency requests  a  total  of 522,106,000 and 206.5  permanent  workyears for
1984 from the Hazardous Substance Response Trust Fund  appropriation for technical,
administrative and legal  enforcement activities.  This  represents an  increase  of
57,479,800 and a  decrease of 5.8 permanent  workyears  from 1983.   the  increase  in
dollars reflects  greater  reliance  on  contract resources  to  intensify  efforts  to
secure privately-financed actions in response to releases  of  hazardous  substances.
In addition, contract  funds  will  also  support an  increased level  of  cost recovery
actions thereby conserving  the Trust  Fund  for  use  at future  sites  and  spills.
The decrease in permanent workyears reflects the  decreased need  for legal  policy
development 1n 1984.

Program Description

     Hazardous substance  response  enforcement consists  of the  administrative and
legal  enforcement  actions authorized  under  CERCLA.   In  the  event  a   release  or
threat of  a release  presents  an imminent  or  substantial  endangerment  to  public
health, welfare,   or  the environment, the Agency may order responsible parties  to
take abatement action  by issuing a  CERCLA  §106 Administrative  Order.   NoncompH-
ance with such orders can result in the Agency assessing fines and/or treble damage
penalties against  the  party.   Civil  judicial  actions  also  may  be  initiated  to
compel response action.   CERCLA §107  authorizes  the Agency to recover  the  cost  of
Federally-financed response  actions  from  responsible  parties  by  documenting the
release of  threat of release,  linking  responsible  parties to  the site  or  spill,
and indicating that  the  Federal  response  was not Inconsistent  with the National
Contingency Plan.   Criminal  actions  may be initiated for failure to notify authori-
ties of releases as required under CERCLA §103.

     Combined legal  and  technical  documentation  will   support  identification  of
parties responsible  for  uncontrolled  waste  sites  and  spills,  negotiations  for
privately-financed response  when  possible,  development  and  execution  of  CERCLA
§106 Administrative  Orders,  Initiation  of cost recovery actions,  and the develop-
ment of  civil  and criminal  referrals  for abatement and cost recovery actions  to
the Department of  Justice when  warranted.   The Agency will also provide technical
and legal  enforcement support for the  management  of on-going imminent hazard and
cost recovery  cases  filed by the Department of Justice  on behalf of  the  Agency.
The technical and  legal  enforcement  functions of  this program are performed under
separate program  elements consistent  with the Agency's  reorganization  of enforce-
ment activities.

     Technical  Support  -  Office of Legal and Enforcement Counsel— This  program
element comprises the Superfund portion of the activities  of  the National Enforce-
ment Investigations  Center  (NEIC)  in Denver, Colorado  which  is within  the  Office
of Legal and  Enforcement Counsel  (OLEC).   The  NEIC provides technical  support  to
various aspects of the  Superfund enforcement  program, with  emphasis on  specialized
technical case  support for  high  hazard  and high priority  enforcement cases  as
well as  national   expertise  and  specialized services  not  normally  available  at
Headquarters or in  the Regions.  The  NEIC  focus  is on  provision of  specialized
Investigatory assistance; technical  support for case  development  for  recovery  of
funds expended  for  remedial  and removal  actions;  evaluating   technical  evidence
related to litigation  efforts;  case  preparation  investigations;  high  hazard sample
                                       SF-21

-------
analysis associated with  the development  of priority enforcement  cases;  special-
ized technical  support  in negotiating  priority settlements; provisions  of  expert
technical witnesses in  support  of litigation;  and  specialized  assistance  to State
enforcement activities.   The NEIC  is  primarily  concerned  with the  provision  of
specialized technical   support  to the  Agency's civil  and criminal  litigation  ac-
tivities.

     Hazardous Substance Technical Enforcenient — This program covers the technical
enforcement 'component of  the Superfund1 'program  and is  responsible  for initiation
of administrative  enforcement  actions.   Through a  nationally  managed  program,  the
Agency will provide  support  of  efforts to  secure  responsible  party  response  ac-
tions at uncontrolled sites and spills.  This will include seeking response actions
through negotiations and  voluntary  settlements with responsible parties, maintain-
ing an aggressive Administrative Order process, and developing high quality, legal-
ly defensible technical  evidence for  civil  litigation,   A  major  program  emphasis
will be  on the  recovery  of  Superfund costs,  wherever  possible, for  removal  and
remedial actions through  the issuance  of demand  letters to  responsible  parties,
negotiation for  payment by  these  parties,  and  technical  support  of litigation.
Technical support  of  criminal  enforcement  actions  will  be provided  as well  as
support of  State lead  enforcement  efforts  at uncontrolled hazardous  waste  sites,

     HazardousSubstanceLegal  Enforcement — This program provides the legal staff
for enforcement  efforts under'  the Superfund program,  A  major  emphasis under this
program is  the development of the legal documentation  necessary to reach agreement
for privately-financed  response  action at  hazardous  waste  sites and  spills.   In
cooperation with  technical   enforcement  staff,  this  program  will  provide  legal
support for the  issuance  of  demand  letters, Administrative  Orders  and will  parti-
cipate with the  Department  of Justice  in  negotiations  of consent  decrees  and the
conduct of  civil and  criminal  litigation.   In  addition,  EPA legal  staff will- work
with the Department of  Justice  to support cost recovery  actions when  a Superfund-
fihanced response has been taken.  Finally, this program will ensure that a nation-
ally consistent enforcement approach is taken under Superfund.

TECHNICAL SUPPORT - OFFICE OF LEGAL AND ENFORCEMENT COUNSEL

1984Program Request                                             i

     The Agency  requests  a  total  of  S964,500  and  12.D permanent workyears  for
this program  from  the  Hazardous  Substance  .Response   Trust   Fund  appropriation.
This represents  a  decrease  of  $1,381,700 and  3.0  permanent workyears  from 1983.
The decrease  reflects  a  refocusing  of  the  National   Enforcement   Investigation
Center's (NEIC)  efforts  to  the  technical   support  of  certain   civil  and  criminal
litigation.  Less emphasis will  be  placed  on nonlitigation related activities such
as the  development  of investigative  and  analytical protocols  and  routine compli-
ance inspections.

     In 19R4, this program will  provide .specialized technical  support to national-
ly managed  cases that require  unusually  complex or  difficult  technical  capabili-
ties.   This program  will  supplement Regional  staff in those  cases  that are tech-
nically difficult, and  will  fully  support precedent-setting criminal  cases.   Re-
sponsibilities will  include  providing  technical  consultation  and assistance  in
case preparation  activities  including high hazard  laboratory procedures;  field
investigations in  support of  case  development  efforts   for certain  categories  of
cases;  laboratory  analysis;  evidence  evaluation;   report   preparation;  technical
testimony,  and,  negotiation  of technical  aspects  of key consent decrees.  Special-
ized technical  assistance will  be provided to  State  and Regional  case development
efforts in  preparation  and  analysis of high  hazard samples.   Contract  funds will
provide for a continuation of the evidence audit  function.
                                       SlF-22

-------
1983 Program

     In 1983, the  Agency is  allocating  a total  of 52,346,200 and  15.0 permanent
workyears to  this  program from  the Hazardous  Substance Response  Trust Fund  ap-
propriation.  Specialized technical capabilities will  be made available to Regional
enforcement programs  and State  agencies  for  site entry  procedures,  sampling  of
highly hazardous drums and tanks, preparation and  analysis  of high  hazard samples,
and a wide  range  of specialized  analytical procedures,  quality control,  and evid-
ence security procedures.  The Agency will assist  the  Federal  Bureau of Investiga-
tion (FBI) and Regional  investigative staffs 1n criminal  investigations of hazardous
waste disposal  practices  by   training  FBI  personnel   in   EPA  technical  evidence
gathering procedures.   Ah evidence  audit control  process  will  be  continued  in
1983.  This  will  ensure  that  proper  cha1n-of-custody  procedures  are followed  to
support the field investigation team contract.

1983Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accompli shments

     In 1982, the  Agency obligated  a  total   of $1,564,900  for this  program  from
the Hazardous Substance  Response Trust Fund  appropriation.   This program provided
technical consultation  and  assistance   in litigation   preparation   by  performing
laboratory analyses,  data evaluation,   technical  testimony,  and  negotiation  of
technical aspects  of consent  decrees.   It also  developed  high hazard  laboratory
procedures, investigative protocols, and  provided  technical  support in  the  review
of Agency regulations.

HAZARDOUS SUBSTANCE TECHNICAL ENFORCEMENT

1984 Program Request

     The Agency  requests  a total  of SI7,512,800 and 120.6 permanent  workyears  from
the Hazardous Substance  Response Trust  Fund appropriation  for  this  program.  This
reflects an  increase of S8,767,200 and  2.7  permanent  workyears to-expand  efforts
to secure privately-financed  response  action  at  National  Priority  List  sites  and
to initiate  cost  recovery in  all  cases  where there is  a financially  viable party
and it 1s cost-effective.

     Efforts to   secure   response  action  at National  Priority  List  sites will  be
provided through  a  nationally  managed   program  coordinating  legal  and  technical
activities and assuring  consistency with Agency policy.  The Agency will  continue
to identify, notify, and negotiate with responsible parties in an attempt to secure
voluntary, privately-financed  response  action  at  uncontrolled  hazardous  waste
sites.  The  Agency  anticipates reaching  settlements with responsible parties at 50
sites.  The Agency will  issue CERCLA §106 Administrative Orders, monitor compliance
with orders,  and provide  technical  support for  any litigation necessary to enforce
them.  High  quality, legally  defensible  technical  evidence will  be provided  to
support the  development  of ten  new civil cases  to compel private  party  response
and to support an  estimated 40 on-going  civil actions  already filed by the Depart-
ment of Justice  on behalf of the Agency.   >

     In order to conserve Trust  Fund resources  for use at  abandoned sites,  efforts
to recover  Trust  Fund  costs   for  removal and  remedial actions  will  Increase  in
1984.  Through issuance  of demand letters, negotiations, and,  if necessary, tech-
nical support for  civil  litigation authorized  under  CERGLA §107, the Agency  will
seek recovery of Trust  Fund   costs  from  financially  viable  responsible  parties.
The Agency expects to refer 24 cost recovery  actions  to the Department of Justice.
                                        SF-23

-------
     These efforts will  be supported by  contract resources to meet  the  stringent
technical  requirements essential  for  negotiations,  administrative enforcement, and
litigation including  evidence  audit  activities.   Specifically,  these  resources
will  be used to  search for  responsible  parties and determine their  financial  vi-
ability, to  develop  proposed  plans  for   response  actions  or review  defendants'
plans; to conduct  .analysis of  potential  populations  at risk; to  conduct evidence
audits; and, to  secure expert  witness  support  for  litigation  and  negotiations.
Effective management of these resources  will  require  close coordination  with re-
sponse personnel   and  legal   enforcement   staff  to  avoid   duplication  of  efforts
undertaken in  planning possible  Federal  response  and to  provide  the  broadest
possible basis of technical information to support enforcement actions.

     Technical  support for criminal enforcement  actions will  be  provided  as  well
as support of 3.0 State actions at uncontrolled waste sites.

1933 Program

     In 1983, the  Agency   is  allocating  a total  of 58,745,600 and 117.9  permanent
workyears from the Hazardous  Substance Response Trust  Fund  appropriation  for this
program.  These  resources  support  the  effort  necessary to  begin enforcement  at
sites on the expanded  National  Priority  List  and  to  initiate cost  recovery  where
Federal funds have been expended.

     The Agency will  develop technical enforcement policies and manage a nationally
consistent program to  secure  privately-financed  response  actions  at  National  Pri-
ority List  sites.   The Agency  will identify  responsible  parties  at  sites  on the
priority list, will  initiate  appropriate  administrative actions,  and  support legal
actions.  The  Agency  anticipates  reaching  settlements  at  36 sites.  The Agency
will  issue  CERCLA §106 Administrative  Orders to  abate imminent  hazards,  monitor
compliance with such orders,  and  provide  technical  support for any litigation that
may be  necessary  to  enforce  them.  The  Agency will provide  high  quality,  legally
defensible technical  enforcement  support  for 25  on-going  cases,  the development
of seven new civil actions, and four criminal enforcement actions.

     The Agency  will  initiate  cost  recovery actions  against financially viable
responsible parties  at sites  where  Federally-financed  removal  actions  have  been
undertaken.  Demand letters will  be issued to responsible  parties and negotiations
will  be conducted  to recover costs.  Technical  support for the development  of 14
cost recovery referrals to the Department of Justice will be provided.

     The Agency  will   support  30 State  lead  enforcement  actions  at uncontrolled
sites.

1983 Explanation of Changes from Budget Estimate

     The net decrease of -5474,100  results from the following action:

     -Reprojranmings.  (-5474,100)  During the development of the operating plan,
several reprbgrammTngs were  made to this  activity  which a-re  not  reportable under
the Congressional reprogramming limitations.

1982 Accpmpl ishments

     In 1982, the Agency obligated  $6,581,700 from the Hazardous Substance Response
Trust  Fund  appropriation   for  this  program.   This  level  represented  the  combined
technical and legal enforcement resources  in Headquarters and the  Regions.
                                       SF-24

-------
     This program  supported  the  national  management of  actions  initiated  at sites
on the  Interim  Priority List  and  other  sites where  CERCLA funds  were expended.
Resources were  used  to identify,  notify, and  negotiate with  responsible  parties
for site  response  actions.  Technical  support was  provided  to the  Department of
Justice for the  on-going docket  of 42 filed  imminent  hazard  cases  and for the de-
velopment of nine  new  civil  referrals.   The  Agency negotiated settlements  worth an
estimated $29.3 million in privately-financed  response activities at 20 sites.  In
addition, the  program   received  $2.3  million  in  cost  recoveries  and  voluntary
contributions for  Federal  response actions.   The  Agency initiated  its Administra-
tive Order program and  provided  technical support  for the development  of  18 cost
recovery actions referred  to the  Department   of  Justice,  State lead enforcement
actions were supported by technical expertise provided by the Agency.

HAZARDOUS SUBSTANCE LEGAL ENFORCEMENT

1984 Program Request

     The Agency  requests a total   of  $3,628,700 and 73.9 permanent  workyears from
the Hazardous  Substance Response  Trust  Fund appropriation  for  this  program.  This
represents an increase  of  $94,300 and a  decrease  of 5.5 permanent  workyears from
1983.  This  decrease  in permanent workyears  reflects  the  completion  of  initial
development of Agency legal enforcement policies in 1983.

     In 1984, this  program will  emphasize  those  enforcement actions  necessary to
obtain privately-financed  response actions and  to  recover Federal  costs related to
removal and  remedial   actions.   Appropriate   legal  approaches  will  be  selected
and undertaken  against  those  identified  parties  that  do  not  properly  undertake
removal or remedial actions  at hazardous  sites and who  fail  to  reach  a negotiated
settlement.

     Actions will  Include  the  issuance  of Administrative Orders and initiation of
civil and/or  criminal  litigation.  Actions  will   be  initiated   to  recover  Federal
expenses related to Federally-financed response activities.

     The Agency will ensure  that  a consistent  and  fair legal  approach is  followed
through the  implementation  of its enforcement policies.   These policies  will  be
used to  guide  the  conduct of  enforcement actions.  Specifically, the Agency will
ensure consistency in  negotiated  settlements  and  in decisions  related to  the ini-
tiation and conduct of civil  actions.

     The Agency will provide  support  to the Department  of  Justice  for 40  on-going
civil actions; will prepare  ten  new civil cases  to compel  private  party response;
will refer 24  cost  recovery  cases; and,  will  refer four criminal  cases to the De-
partment of  Justice.   Legal  support and documentation  will  be  provided   in  the
development and  execution  of  negotiated  settlements,   Administrative  Orders,  and
enforcement of Administrative Orders and consent decrees  as required.

1983 Program

     In 1983, the  Agency is  allocating  $3,534,400 and  79.4 permanent workyears for
this program  from  the  Hazardous   Substance   Response  Trust  Fund  appropriation.
Agency efforts will focus  on providing  the necessary legal support  in negotiations
with responsible parties for privately-financed response  actions.

     The Agency will provide  support  to the Department  of  Justice  for 25  on-going
civil actions and  will  prepare seven new civil cases  to compel  private party re-
sponse, refer  14  cost  recovery cases,  and will  refer four  criminal  cases to the
Department of  Justice.   Legal  support  and documentation  will  be provided  in  the
devel opnient and  execution  of  negotiated  settlements,   Administrative  Orders,  and
enforcement of Administrative Orders and consent decrees  as required.
                                        SF-25

-------
     In addition, In  1983 the Agency  will  complete initial  development of enforce-
ment policies to  ensure a  fair  and  consistent  approach in  pursuing enforcement
actions, including  developing  with the  NEIC  guidelines  for  judicially  admissible
evidence and  documentation   required  to  establish  the  liability  of  responsible
parties,

1983 Explanation of Changes from Budget Estimate

     The net decrease of -3228,200 results from the following action:

     -Reprpgranmrings.  (^$228,200)  During  the development of the  operating plan,
several reprogrammings were  made to this activity  which are  not  reportable under
the Congressional reprogramming limitations.

1982 Accompl i shments

     In 1982, the Agency obligated a total of 5263,000 from the Hazardous Substance
Response Trust Fund  appropriation.   Due to the enforcement  reorganization  in mid-
1982, this amount represents  only a portion of the costs of legal  support  activi-
ties.  Legal support including the development and initiation of civil and criminal
cases for  the  Superfund program were  also funded  under the Hazardous  Substance
Technical Enforcement program element.  The Agency  obligated a total  of $6,844.,700
for the activities carried out under these two program elements in 1982.
                                        SF-26

-------
Page Intentionally Blank

-------
Management and
    Support
      SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table of Contents
SUPERFUND
    MANAGEMENT & SUPPORT
       Management & Support..,
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
          Hazardous Substance
Financial Management ~ Headquarters....	
Financial Management - Regions	
Administrative Management - Headquarters....
Administrative Management - Regions.........
Occupational Health & Safety - Headquarters.
Support Services - Headquarters.,...	
Support Services - Regions	
Laboratories 8 Facjlities	
Computer Services	
Legal Services - Headquarters	
Legal Services - Regions	
- Inspector General		.....
Natural Resource Claims,.	
- Office of Policy S Resource Management....
                                                                            Page
SF-28
SF-33
SF-33
SF-34
SF-35
SF-36
SF-35
SF-37
SF-38
SF-38
SF-39
SF-39
SF-40
SF-41
SF-41
                                      SF-27

-------
      SUPERFUND
Management and Support


PROGRAM
Hazardous Substance
Financial Management -
Headquarters
Hazardous Substance
Response Trust Fund
TOTAL
Hazardous Substance
Financial Management -
Regions
Hazardous Substance
Response Trust Fund
TOTAL
.Hazardous Substance
Administrative
Management - Headquarters
Hazardous Substance
Response Trust Fund
TOTAL
Hazardous Substance
Administrative
Management - Regions
Hazardous Substance
Response Trust Fund
TOTAL
Hazardous Substance
Occupational Health and
Safety - Headquarters
Hazardous Substance
Response Trust Fund
TOTAL
Hazardous Substance
Support Services -
Headquarters
Hazardous Substance
Response Trust Fund
TOTAL
Hazardous Substance
Support Services -
Regions
Hazardous Substance
Response Trust Fund
TOTAL
ACTUAL
1982
(DOLLARS




$208.9

$208.9



589. Z

589,2



SI, 419. 3

51,419.3



5360.6

$360.6



$482.4

$482.4



$3,101-3

$3,101.3



$352.3

$352.3
BUDGET CURRENT E
ESTIMATE ESTIMATE
1983 1983
IN THOUSANDS)




$778.9 $778.9

$778.9 $778.9



$283.8 $236.9

$283.8 $236.9



53,028,0 $3,164.0

33,028.0 $3,164.0



$271.1 $385.4

$271.1 .$385.4



$665.0

$665.0



$3,097.3 S3, 626. 3

$3,097.3 $3,626.3



$964.6 $1,283.4

$964.6 $1,283.4
:STIMATE INCREASE +
1984 DECREASE -
1984 VS 1983





5564.9 -$214.0

$564.9 -$214.0



$364.4 $127.5

$364.4 5127.5



52,636.3 -$527.7

52,636.3 -5527.7



5401.0 $15.6

5401.0 $15.6









$4,601.8 $975.5

$4,601.8 $975.5



$1,371.3 587.9

51,371.3 $87.9
        SF-2B

-------
                                      SUPERFUND

                                Management and Support

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE  -
                                           1983       1983             1984 VS  1983
Hazardous Substance
Laboratories &
Facilities
 Hazardous Substance
 Response Trust Fund
Hazardous Substance
Computer Services
 Hazardous Substance
 Response Trust Fund
Hazardous Substance
Legal Services -
Headquarters
 Hazardous Substance
 Response Trust Fund
                       TOTAL
                       TOTAL
                       TOTAL
Hazardous Substance
Legal Services - Regions
 Hazardous Substance
 Response Trust Fund
                       TOTAL

Hazardous Substance
Inspector General
 Hazardous Substance
 Response Trust Fund
                       TOTAL
Hazardous Substance
Natural Resource Claims
 Hazardous Substance
 Response Trust Fund
                       TOTAL
Hazardous Substance -
Office of Policy and
Resource Management
 Hazardous Substance
 Response Trust Fund
TOTAL:
 Hazardous Substance
 Response Trust Fund
                       TOTAL
 (DOLLARS IN THOUSANDS)




  $136.2

  $136.2



  S255.4   51,435.0   $1,535.0   51,480.0

  $255.4   $1,435.0   $1,535.0   $1,480,0
   $69.8

   $69.8



  $139.1

  $139.1
$280.3

$280.3



$236.0

$236.0
$280.3

$280.3



5202.8

$202.8
$243.5

5243.5



$397.1

$397.1
              $40.0

              S40.0
            $40.0

            $40.0
-555.0

-$55.0




-536.8

-$36.8



5194.3

S194.3
SI,671,4   $2,813.9   $2,813.9   $2,570.2   -5243.7

$1,671.4   $2,813.9   52,813.9   $2,570.2   -$243.7
                     -$40.0

                     -540.0
$1,225.3   51,432.1   51,432.1   $1,224.0   -$208.1

$1,225.3   51,432.1   51,432.1   51,224.0   -5208.1


$9,511.2  515,326.0  515,779.0  515,854.5     575.5
Management and Support TOTAL   59,511.2  515,326.0 . $15,779.0  515,854.5     575.5
                                        SF-29

-------
                                      SUPERFUND

                                Management and Support

                                ACTUAL   BUDGET     CURRENT   ESTIMATE   INCREASE  +
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE  -
                                           1983       1983             1984 VS  1983
PERMANENT KORKYEARS
                                (DOLLARS IN THOUSANDS)
Hazardous Substance
Financial Management -
Headquarters

Hazardous Substance
Financial Management -
Regions

Hazardous Substance
Administrative
Management - Headquarters

Hazardous Substance
Administrative
Management - Regions

Hazardous Substance
Occupational Health and
Safety - Headquarters

Hazardous Substance
Legal Service -
Headquarters

Hazardous Substance
Legal Services - Regions

Hazardous Substance
Inspector General

Hazardous Substance
Natural  Resource Claims

Hazardous Substance -
Office of Policy and
Resource Management

TOTAL PERMANENT WORKYEARS
 3.4
 4.0
18,4
 2.0
 1.5
 5.0
 6.0
 2,1
 5.8
 5.0
 9.2
 5.8
4.4       -.6
9.2
22,0       24.1       25.3       1.2
 5,8       10,0       10.0       10.0
5.0       -.8
.8
17.5

2.9
1.0
22.0
1,0
7.0
10.0
22.0
1.0
7.0
10.0
19.3

7.0

-2.2
-1,0

56.3       81.9       94.1       90.7      -3.4
TOTAL WORKYEARS

Hazardous Substance
Financial Management
Headquarters

Hazardous Substance
Financial Management
Regions
 4.6
 4.0
 5.0
 6.0
 5.0
4.4       -.6
10.0       10.0
                                       SF-30

-------
                                      SUPERFUND

                                Management and Support

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983       1983             1984 VS 1983
Hazardous Substance
Administrative
Management - Headquarters

Hazardous Substance
Administrative
Management - Regions

Hazardous Substance
Occupational Health and
Safety - Headquarters

Hazardous Substance
Legal Service -
Headquarters

Hazardous Substance
Legal Services - Regions

Hazardous Substance
Inspector General

Hazardous Substance
Natural Resource Claims

Hazardous Substance
Office of Policy and
Resource Management

TOTAL WORKYEARS
(DOLLARS IN THOUSANDS)

   19.3        25.1        28.6        28.7



    5.8        10,0        10.0        10.0
    3.2
    1..5
3.5
6,0
6,0
                                                                                .1
5,0      -1.0
4.1
17.5

4.6
5.0
22.0
1.0
7.0
14.0
22.0
1.0
7.0
10.0
19.8

9,0
-4,0
-2.2
-1.0
2.0
   64.7       90.6      103.6       96.9      -6.7
                                       SF-31

-------
                                     SUPERFUHD


                               Management and Support
Budget Request
     The Agency requests a  total  of 315,854,500 and 90.7  oermanent workyears from
the Hazardous Substance Response Trust Fund appropriation for Management and Support
activities in 1?84.  This  represents  an increase of $75,500 and  a  decrease  of 3.4
permanent workyears from 1983.

Program Description

     This function provides  basic management and  support  services  for the  Super-
fund program, including  rent, utilities, financial  and  administrative management,
contracts management,  data   systems  management,  occupational   health  and  safety,
orograniinatic and  regulatory  analysis,  and" budget  formulation  and execution.   This
function also includes  resources  for the Suoerfund related activities of the Of-
fices of the  General  and Regional  Counsels  and the  Office of  Inspector General.

     Hazardous Substance Financial Management  -  Headquarters and Regions  ~ This
component containstwo programelements whichmaintainfinancialrecords,  and
track and  report  on  the  use  of  the  Hazardous  Substance Response  Trust  Fund,

     Hazardous Substance Administrative Management  -  Headquarters and Regions—
This component also contains  two  program elements.The resources  fund  the  Super-
fund administrative services  necessary  to award and administer  contracts,  orocess
personnel actions, provide  central  management and technical  support for Superfund
information systems,  acquire and  maintain   Superfund  office  and  laboratory  ser-
vices, and  provide technical  assistance and  training  for the  Superfund  program
staff to assure the safety of those employees.

     Hazardous Substance Occupational  Health and Safety  -  Headquarters  —  These
resources provide  technical   assistance  aril training  for  the  Superfund  program
staff to assure the  safety  of those employees exposed to toxic and other hazardous
substances.  This  program  element  was  consolidated  with  the  Hazardous  Substance
Administrative Management - Headquarters program element in 1983.

     Hazardous Substance Support Services  -  Headquarters and Regions  — The two
program elements  in  this component cover the costs  of  space,  utilities,  printing,
equipment, and other nonpersonnel  support needs incurred  by the  Superfund  program
staff.

     Hazardous Substance Laboratories and_Fact 11 ties --  This  program  element pro-
vide s~7unlII""TbT~l:olTsTnIcTfQTr^                                 to  ensure the safe
handling of toxic and other hazardous substances,

     Hazardous Substance Computer Services *•- This  program element  funds the data
processing (timesharing) costs  of  operating  and maintaining all Suoerfund Informa-
tion systems.                              s

     Hazardous Substance Legal Services - Headquarters and Regions  —  These  pro-
gram elements fund the activities of the Office of the General  Counsel  {OGO and
the Offices  of  the Regional  Counsels  under Superfund.   These  activities  include
statutory Interpretations  of the  Comprehensive Environmental   Response,  Compensa-
tion, and Liability Act  (CERCLA5; and the issuance of ooinions  and advice  regard-
ing the  use  of the Hazardous Substance  Response  Trust  Fund  and  other   financial,
administrative, or legal  issues.   In  addition,  OGC  acts as  the  Agency's  chief
                                        SF-32

-------
counsel in defending regulatory and  other  Agency decisions regarding the implemen-
tation of CERCLA and  supports  the enforcement litigation  program.   The  Offices of
the Regional  Counsels  advise  and  assist the  Regions and States in interpreting the
Act and represent Regions in defensive litigation activities.

     Hazardous Sub stance^ Jjspec tor'General  -- This  program element  funds  the  Con-
gressionally required" annual5iidiTT oT the Trust Fund,  as well  as  pre-award,  in-
terim, and  final  audits  of contracts  awarded  under  the  Superfund program,  and
audits of Cooperative Agreements with the States.

     Hazardous Substance Natural Resource Claims —  This program  element  provides
funds for the Board of Arbitrators which will  settle disputes regarding  payment of
claims for natural  resource damages.

     Hazardous Substance - Office of Policy and Resource Management >- This program
provides resourcesfor budget  development 'andfundoversigHt,policy  analysis,
management assessments and evaluations,  under the Superfund program..

HAZARDOUSSUBSTANCE nj^J^L_;HANAg_EHENT ~ _ HEADQUARTERS

1984 Program Request

     The Agency requests 5564,900 and 4.4 permanent workyears for this program from
the Hazardous  Substance  Response  Trust  Fund appropriation,  a  decrease  of  $214,000
and .6 permanent workyears.   this reflects the completion  in  1983  of the develop-
ment of  standardized   systems  and procedures.   These  resources  fully  service  the
Headquarters components of the  Superfund program with  the  complete array of finan-
cial management activities.   This includes  basic accounting  and payroll  support,
processing all  financial  actions  and vouchers, access  to  the Financial  Management
System, cash  management controls,  and   site  .specific  accounting to support  cost
recoveries.

1983 Program

     In 1983,  the  Agency  is  allocating 5778,900  and  5.0  permanent workyears  for
this program  from  the  Hazardous  Substance   Response  trust   Fund  appropriation.
These resources  adequately fund  all necessary  day to  
-------
Management and  Support media.   However,  financial  management  for the  Superfund
program is distinguished  by the  unique  nature  of  the program  !-•- site  and  spill
response actions, financial recovery actions, and requirements for financial infor-
mation on  Specific  sites  and  for  Superfund as  a  distinct  appropriation.   These
resources will  support  transactions  processing  (travel, payroll,  vouchers);  gene-
ral  ledger activities;  imprest  fund  services;  financial  reporting;  and  answers
to Superfund  program  office  inquiries  and  on-scene  coordinator  problems.   This
request enables  the  Regional  finance  offices to  keep pace  with  Superfun:d  field
activities, and the financial  transactions supporting those activities.

1983 Program

     The Agency  is  allocating 5236,900  and  9.2 permanent  workyears  to  this  pro-
gram from  the Hazardous Substance Response  Trust Fund  appropriation  in order  to
support expanded  Superfund field activity  and meet  the  increasing  demands  for
sound financial  management and  fund control  in the Superfund program.   Among the
responsibilities of  the  Regional  finance  offices  are:   providing  timely  and
accurate financial  reports;  maintaining  internal   controls to  ensure the  fiscal
integrity of  the Fund; billing and  collecting monies  due the  Fund  for  Federal
response recovery actions;  coordinating  financial  data  from other Federal  agen-
cies; and, providing  accurate  and  auditable document supoort  for all  Superfund
financial transactions,

1983 Explanation of Changes from Budget Estimate

     The net decrease of -546,900 results from the following action:

     -Reprograromings.   !-S46,900)  During  the development  of the  operating  plan,
several reprogranmings were made to this  activity  which  are not reportable  under
the Congressional reprogramming limitations.

1982 Accompli shments

     The Agency  obligated  $89,200 from the Hazardous Substance  Response  Trust Fund
appropriation for this  program.  The  Regional  finance offices  provided  financial
reports; implemented and maintained  internal  contracts to ensure the  fiscal integ-
rity of the Fund; collected State cost share; coordinated financial data  from other
Federal agencies and other financial  activities.

HAZARDOUS SUBSTANCE ADMINISTRATIVE MANAGEHEHT - HEADQUARTERS

1984 Program Request

     The Agency  requests 52,636,300  and  25.3 permanent workyears for  this  program
from the  Hazardous  Substance  Response  Trust Fund  appropriation, a  decrease  of
1527,700 and  an  increase   of  1.2  permanent workyears.   This  decrease  reflects the
completion of health and safety standards in 1983.

     The request  provides  centralized  administrative   services  in the  contracts,
grants, information management,  health  and  safety, and  personnel areas.   In the
contracts area,  we will award and administer  new contracts and  purchase  orders,  as
necessary, and manage  the  large mission  contracts awarded  in 1982 and 1983.   This
entails contract  monitoring,  task order  issuance,  and subcontract approval.   The
Grants Administration Division will  award  and administer  the Superfund Cooperative
Agreements.  The  Superfund Information  Systems  staff  will  continue to  manage the
development of the  Superfund  systems with particular  emphasis   on integrating the
new systems with  existing  Agency systems and data bases.   The  Occupational Health
and Safety Staff will  develop and  certify  training  courses, work with the National
Institute of  Occupational   Safety and  Health Administration  and  the U.S.  Coast
Guard on interagency safety task forces, and develop specialized medical  monitoring
programs.  The  Headquarters  Superfund  personnel team will  provide   staffing  and
classification activities to service Superfund personnel.
                                        SF-34

-------
1983 Program

     The Agency  is  allocating  33,164,000  and  24.1  permanent  workyears  for  this
program from the  Hazardous  Substance Response Trust  Fund  appropriation  to provide
centralized administrative  and  management  services.   In  1983, we  are maintaining
and refining the  administrative  services  initiated in 1982.  We  are  devoting  sig-
nificant resources to  manage the  contracts awarded  in  1982,  including  two  major
mission contracts,  and to  award  new  1983 contracts.   We  are  implementing  and
refining health  and  safety standards  and procedures.  We  also  are  continuing  to
support the Superfund program in the areas of information and personnel management,

1983 Explanation of Changes from Budget Estimate

     The net increase of +5136,000 results from the following actions:

     -Restructuring.   (+3665,000)  The  Congressionally  approved;  restructuring  con-
sol idat₯d~aTr~Super:T'und Administrative Management responsibilities into one program
element.  Therefore,   Occupational  Health and  Safety  resources  were transferred
into the Hazardous Substance Administrative Management program element,

     -Reprogrammings.  (-3529,000)   The  Congressionally  approved  change  repro-
grammed fundsfromthe   Superfund  Management  account  to  the  Superfund  Support
account.  Additional  funds provided support for Superfund workyears and the portion
of Agencywide  updated  and  revised  support  costs  which  were  associated  with  the
Superfund program.  The  reprogramming above was  included in a letter to Congress
on November 17, 1982.

1982 Accompli shments

     The Agency  obligated  $1,419,300  for  this  program from the Hazardous Substance
Sesponse Trust Fund  appropriation.   With  these resources,  we  awarded and adminis-
tered large mission  contracts  required to carry out  response "and remedial  activi-
ties; provided central technical support  for developing, operating, and maintaining
all Superfund  information  systems; maintained  and  supported the  personnel require-
ments of the program  staff; and,  supported the  program in  such  areas as telecom-
munications, printing, space management,  and office services.

HAZARDOUS SUBSTANCE ADMINISTRATIVE MANAGEMENT - REGIONS

1964 Program Request

     The Agency  requests   $401,000  and 10.0  permanent  workyears,  an  increase  of
515,600 from 1983 from  the Hazardous  Substance Response  Trust Fund appropriation,
to maintain the  current administrative management  services  of the Regional activi-
ties of the Superfund program.   In addition to providing traditional administrative
services, these  resources  nn'11  enable the  Regions to  coordinate the  efforts  of
Regional Superfund program  offices  and the Headquarters'  Procurement  and Contracts
Management Division by providing overall  management of Superfund Regional procure-
ment activities,  and  interpreting  and disseminating information  reporting require-
ments among  various  Regional   offices   and  other  Federal  and  State  agencies.

1983 Program

     The Agency  is allocating  3385,400 from the  Hazardous Substance Response Trust
Fund appropriation and 10.0 permanent workyears  to this program.   These funds  will
expand and  continue  administrative  and management services necessary  to  support
the Regional  Superfund program.   In  order to meet  growing program  demands,  the
Agency is increasing its efforts in the areas of contracting and purchasing, infor-
mation management, and occupational health  and safety.
                                        SF-35

-------
1983 Explanation of Changes from Budget Estimate

     The net increase of +5114,300 results from the following action:

     -Reprogrammings.  (+$114,300)  During  the  development of the  operating nlan,
several reprogramniings were  made to this activity  which  are not  reportable under
the Congressional reprogr aiming limitations,

1982 Accomplishments

     The Agency obligated 5360,600 from the Hazardous Substance Response Trust Fund
appropriation for this program.   These  funds provided administrative  support ser-
vices which enabled the  Regional  Superfund  programs  to  operate  in an effective and
efficient manner.  The activities in the  Superfund  Regional  Administrative Manage-*
ment program paralleled  those described  in the  Agency's Regional  Administrative
Management program  in  the  Management  and Support media,  but supported  the  Super-
fund program directly.  Activities and services included contracting and purchasing
assistance, employee health and safety, information management,  property and supply
management, space management, and mail  services.

HAZARDOUS SUBSTANCE OCCUPATIONAL HEALTH AND SAFETY - HEADQUARTERS

1984 Program Request

     In 1984, the  Agency is requesting  resources  for the Occupational  Health and
Safety program in  the  Hazardous  Substance Administrative  Management - Headquarters
program element.

1983 Program

     For 1983,  the Agency  is allocating resources  for  these  activities  in  the
Hazardous Substance  Administrative  Management  - Headquarters  program  element  to
reflect the program element restructuring approved by Congress.

1983 Explanation of Changes from Budget Estimate

     The net decrsase of -$665,000 results from the following action:

     -Restructuring.  (-5665,000)  The Congressionally  approved  restructuring con-
so lidateTTirrT^jUpeTFund Administrative Management responsibilities into one program
element.  Therefore,  Occupational Health and  Safety  resources were  transferred
into the Hazardous Substance Administrative Management program element.

1982 Accomplishments

     In 1982, the  Agency obligated  5482,400 from the Hazardous  Substance Response
Trust Fund appropriation to  address health  and safety concerns under this program.
Activities in this area included the continued development of procedures and guide-
lines designed to  protect  the safety of  EPA field  and  laboratory employees and to
monitor the training and certification  of these employees.  In addition, a techni-
cal support and  evaluation  team  was  established to  conduct  on-s1te safety inspec-
tions, evaluate  the adequacy  of safety  programs  and  to  support  EPA  agreements
with the National  Institute  of Occupational  Safety and  Health and the Occupational
Safety and Health Administration.

HAZARDOUS SUBSTANCE SUPPORT SERVICES - HEADQUARTERS

1984 Program Request

     For 1984, the Agency requests $4,601,800 from .the Hazardous Substance Response
Trust Fund appropriation to cover  certain Agencywide  and Headquarters  nonperson*
nel support  costs  allocable  to  the  Superfund  program.   This   is  an  increase  of
                                        SF-36

-------
5975,500 which reflects both  Increasing  costs in the suoport areas and an increase
in the  portion  of  the  Agency's  support costs  that are  allocable to  Super-fund.
For the most  part,  Agencywide  support  costs are  allocated  to Superfund  based  on
the ratio of Superfund workyears to total Agency workyears.  As this ratio changes,
so does the share  of the  total support  costs that  are  allocable  to the  appropria-
tion.

     This program element provides resources  for  Superfund's  share of the Agency's
rent, telephone,  postage,  utilities,  other buildinq and office services,  and health
and safety training.  A full  description of the costs  in  these categories is con-
tained in the Nationwide and  Headquarters Support Services program elements in the
Management and Supoort media.

1983 Program

     The Agency  is  allocating  53,626,300  from  the  Hazardous Substance  Response
Trust Fund appropriation in  1983  for Superfund  support costs.  The  increase over
1982 reflects expanded Superfund  activity and an increase in  the  portion of total
support costs that are allocable to the Superfund Appropriation.

1983Explanation  ofChangesfromBudgetEstimate

     The net increase of +$529,000 results from the following action;

     -Reprogramnn'ngs.  (+$529,000)   The  Congressional1y  approved  change  repro-
grammed funds from the Superfund Administrative Management account to the Suoerfund
Support account.   Additional  funds provided  support for  Suoerfund workyears  and
the portion of Agencywide  updated and revised suoport  costs  which were  associated
with the  Superfund  program.   The  reprogramming  above was included in a  letter  to
Congress on November 17, 1982.

1982^Accomplishments

     In 1982, the Agency obligated $3,101,300  for the Superfund  program  portion  of
the Agency's space  rental,  communications,  utilities, and  other  offices  and build-
ing services costs.

HAZARDOUS SUBSTANCE SUPPORT SERVICES - REGIONS

1984 ProgramJlequ es t

     The Agency  requests  SI,371,300  from the Hazardous  Substance  Response  Trust
Fund appropriation  to provide Regional   Superfund  nonpersonnel support  costs such
as utilities, local  telephone service,  printing  and copying, minicomputer opera-
tions, equipment maintenance,  etc.  This is ail increase of  587,900,  reflecting  an
increased share  of  the  total Regional sunport  costs that are allocable  to Super-
fund.  As with Headquarters Superfund Support, the amount requested in this program
element is  the  Superftjnd  program's   share  of  the total  Regional support  costs,
determined primarily on the  basis of  the ratio of  Regional  Superfund  workyears  to
total Regional workyears.   A  full description  of  the  functions   funded  from this
program element  is  contained in  the  Regional  Support  Services program  element  in
the Management and Support media.

1983 Program

     The Agency  is  allocating  $1,283,400  from  the  Hazardous Substance  Response
Trust Fund  appropriation  to  fund  the Regional  support costs associated  with  the
Superfund program.  The increase  from 1982 reflects  expanded  Regional  activity  in
the program and  an increase  in the  portion  of  total Regional support  costs that
are allocable to Superfund.
                                       SF-37

-------
1983 Explanation of Changes from Budget Estimate

     The net increase of +$318,800 results from the following action:

     -Reprogrammings.  (+5318,800)  During  the  development of the  operating plan,
several reprogrammings were  made to this activity  which are not  reportable under
the Congressional reprogranrniing limitations.

1982 Accompli shments

     In 1982, the "Agency  obligated 5352,300 for  Regional  support  costs associated
with Superfund,  for  Regional  rent; communications  and other nonpersonnel  support
costs associated with Superfund in the Regions.

HAZARDOUS SUBSTANCE LABORATORIES AND FACILITIES

1984 Request

     No funds  are  requested  for  Superfund  related  facilities  projects  in 1984.

1983 Program

     No funds are allocated for Superfund facilities projects in 1983.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     The Agency  obligated 5136,200  from  the  Hazardous  Substance  Response  Trust
Fund appropriation to modify  EPA facilities for  the  benefit  of  the Superfund pro-
gram during 1982.

HAZARDOUS SUBSTANCE COMPUTER SERVICES

1984 Program Request

     The Agency  requests  SI,480,000  from the Hazardous  Substance  Response Trust
Fund appropriation to provide  timeshare  services to  the  Superfund program through
our National  Computer  Center at  Research Triangle Park.  The decrease  of 555,000
froni 1983 reflects a  slight  reduction in the need  to continue  systems development
and testing  at  an accelerated  pace.   These resources  purchase ADP  timeshare  for
the Superfund program.   Based on  spending  patterns  and  program plans,  these  re-
sources will  adequately  cover  the timeshare needs  of existing Superfund manage-
ment information  systems   and   support  the  integration  of   Superfund  information
systems with other related Agency systems and data bases.

1983 Program

     The Agency  is allocating  51,535,000  from  the  Hazardous   Substance  Response
Trust Fund  appropriation  to  this program  to  fund  the  direct timeshare charges
attributable to  Superfund  systems, including a portion of the  Agencywide computer
facility management  contracts,  rental  of hardware  and  software,  and  maintenance
and operational costs.

1983 Explanation of Changes from Budget Estimate

     The net increase of +5100,000 results from the following action:

     -Reprogrammings.  (+5100,0001  During  the  development of the  operating clan,
several reprogrammings were  made to this activity  which are not  reportable under
the Congressional reprogramming limitations.
                                        SF-38

-------
1982 Accompli shments

     The Agency obligated 5255,400 from the Hazardous Substance Response Trust Fund
appropriation to provide timeshare services to the Superfund program,

HAZARDOUS SUBSTANCE LEGAL SERVICES - HEADQUARTERS

1984 Program Request

     In 1984,  the  Agency requests  5243,500 and  5.0  permanent workyears  from the
Hazardous Substance Response  Trust Fund  apnropriation  for this  program.   This  is
a reduction  of less  than  one  permanent  workyear  and  536,800  which reflects  an
anticipated decline in the need  for defensive case support.  The 1984 Headquarters
program will provide continued support  to the  Simerfund program  through  advice and
assistance to Agency  Superfund  managers.   This Includes  consultation on financial
and administrative matters; legal  support  for the development  and defense  of regu-
lations and disbursement decisions; legal  guidance on statutory  interpretation and
development of  response  priorities;  and,   coordination   with  and  support  to. the
enforcement litigation program.

1983 Program

     In 1983, the Agency is  allocating  a  total  of $280,300 and 5.8 permanent work-
years from  the  Hazardous Substance Response Trust Fund appropriation to this pro-
gram.  The  1983  Headquarters program  will  provide advice   and consultation  on
financial and administrative  matters, such  as eligible  uses of  the  Fund and other
Agency aoprbpriations, staffing,  and budget activities;   legal  guidance  in program
matters such  as interpretation  of the  statute and the  National  Contingency Plan;
and, coordination with and support of the enforcement litigation program.

19S3 Explanation of Changes from Budget Estimate

     There are  no changes to this program.

1982 Accomplishments

     In 1982, the Agency obligated a  total  of $69,800  from the Hazardous Substance
Response Trust  Fund  appropriation to this  program.  The  Headquarters program pro-
vided legal guidance in program matters such as statutory interpretation and devel-
opment of response orloritles.

HAZARDOUS SUBSTANCE LESAL SERVICES - REGIONS

1984 Program Request

     In 1984, the  Agency requests 5397,100 and 10.0 pernianent  workyears  from the
Hazardous Substance Response  Trust Fund  appropriation  for this  program.   This  Is
an increase of  $194,300 to support anticipated Regional  participation in defensive
litigation.  The  Regional  program  will continue to provide  legal   assistance  by
reviewing EPA  Cooperative  Agreements with  States for legal sufficiency;  advising
States in  assuring  appropriate  legal authorities to  qualify  for participation  in
Fund-financed actions; responding to challenges  to  enforcement  activities; deter-
mining eligible uses  of  the  Fund; advising on  Federal procurement;  and, treatment
of confidential information,

1963 Program

     In 1983,  the Agency  is allocating  a total  of $202,800 and  10.0 permanent
workyears from  the  Hazardous Substance Response Trust  Fund appropriation to this
program.  The  Regional program  includes such  activities  as:  reviewing EPA Coop-
erative Agreements with  States  for legal sufficiency; assisting State agencies  1n
assuring legal  authorities to qualify  for  participation  In  Fund-financed actions;
and, responding to challenges to enforcement activities.
                                        SF-39

-------
1983 Explanation of Changes from Budget Estimate

     The net decrease of -333,200 results from the following action:

     -Reprogramnrings.   (-$33,200)   During  the  development of the  operating plan,
several reprogrammings were  made to this activity  which are not  reportable under
the Congressional reprogramming limitations.

1982 Accomplishments

     In 1982, the Agency  obligated $139,100 from the  Hazardous  Substance Response
Trust Fund appropriation to this program.   In  198Z,  the  Regional  Counsels assisted
the States on legal  matters concerning  Fund-financed removal  and  remedial actions.
This involves advising  State agencies  on the  legal  requirements under  CERCLA and
assisting in drafting,  negotiating  and  documenting  the terms  of  EPA  Cooperative
Agreements with  States.   They also  advised  on  legal problems associated  with EPA
removal and remedial activities.

HAZARDOUS SUBSTANCE INSPECTOR GENERAL

1984 Program Request

     The Agency  requests  a total  of 52,570,200 and  19.8  permanent  workyears  from
the Hazardous  Substance  Response Trust  Fund  appropriation  for  this  program  in
1984, a decrease  of $243,700  and 2.2 permanent workyears  from  1983.  The decrease
reflects the decreased number of management  evaluations  which  will  be conducted in
1 984.

     The Office  of  the  Inspector  General  will  perform  selected audits of the Trust
Fund to ensure the  integrity  of,  and to safeguard the  assets,  of  the Fund.  Extra-
mural audits  of  contracts  will  ensure costs  claimed  are  reasonable,  allowable,
and alldcable to  the  project.  Extramural  audits will also  include interim audits
of the costs claimed  by Hazardous Site Remedial Response  Activity  contractors and
verification of  State  credit  period  costs.   The Office  of the  Inspector General
wil.l continue to audit State matching  share costs  under planned  removal  actions
and remedial actions.

1983 Program

     The Agency  is  allocating a total  of  $2,813,900 and  22.0  permanent  workyears
from the Hazardous  Substance  Response  Trust  Fund  appropriation to  this  office in
1983.  Extramural contract  resources are  being  used  for audit  services provided by
other Federal agencies  and Certified Public Accountant  firms.   The  Office  of the
Inspector General will  audit  Trust  Fund  activities  which  occurred  in  1982 and
issue the  required  report to Congress  by March 31, 1983.   Extramural  audits  will
ensure costs claimed  under contracts  are  reasonable, allowable,  and allocable to
the sponsored project and  that  internal  controls  are adequate  to  safeguard Federal
assets.  The Office  of the Inspector General expects to perform an increased number
of audits to verify State credit period costs  in 1983, as well as  audits of State
matching share costs.  Full scope audits are planned for remedial  action activities
where the  Agency has  taken  the  managerial  responsibility  for   response action.
Such audits  would include both  financial ;and  management  reviews  of the Hazardous
Site Remedial Response Activity contractors and subcontractors.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.
                                       SF-40

-------
1982 Accomplishments

     In 1982, the Agency  obligated a total of  $1,671,400 from the Hazardous  Sub-
stance Response Trust Fund  appropriation  for this  program,  of which $500,000  was
obligated to cover audit  services performed by  other  Federal  agencies and $524,600
for audit services  conducted by independent  public accounting firms.  The  Office
of the Inspector General performed and submitted to Congress  the  interim  report on
the Trust Fund  on  March 31, 1982,   Pre-award audits  of  contractor proposals  were
performed to evaluate pricing  and  cost data,  the contractors'  financial  capabili-
ties, and the  contractors'  accounting,  procurement, and  property  system  to  assure
that costs  claiTOd  would  be properly accounted  for and Federal assets  prooerly
safeguarded.  The audit efforts with respect  to remedial  actions  were concentrated
in two areas:   (1)  verification of  State credit period costs;  and  (2)  pre-award
audits of contractors  who  competed  for  the  $92 million Hazardous   Site  Remedial
Response Activities contracts,

HAZARDOUS SUBSTANCE NATURAL RESOURCE CLAIMS

1984 Program jtequest

     No resources are  requested from the  Hazardous  Substance Response Trust  Fund
appropriation for this  activity 1n  1984.   This represents  a decrease of  $40,000
and 1.0 permanent workyear  from 1983.  The Agency anticipates only a small  number
of claims in 1984.   If  necessary,   funds  will  be  reprogrammed  into this  program
element.

1983 Program

     The Agency is allocating  340,000  and 1.0 permanent  workyear  from  the  Hazard-
ous Substance  Response  Trust Fund appropriation  to this  program in  1983.   These
resources enable EPA  to  supoort  a Board  of  Arbitrators  under  the  provisions  of
S112(a.) of  CERCLA.  The Board  is authorized  to make  final determinations  of  dis-
puted claims for natural damages.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     No funds were obligated for this activity in  1982,

HAZARDOUS SUBSTANCE -.OFFICE OF POLICY AND RESOURCE  MANAGEMENT

1984 Program Request

     The Agency requests a total of SI,224,000 and 7.0 permanent wor.kyears from the
Hazardous Substance Response  Trust Fund  appropriation  for this  progran.  The de-
crease of $208,100  reflects a   slight  reduction in  the  requirement fo^ policy and
economic analysis as a  result  of the program's continued move into  implementation
activities.   The Office of  the  Comptroller, will  coordinate and prepare the OMB and
Congressional budget  submission,  respond  to  Congressional inquiries,  and  provide
fund oversight  activities  including  on-going  resource reviews which  will  be espe-
cially critical in  1984  when  program expenditures and  activities will  increase.
The Offices  of Policy  Analysis, Standards and Regulations,  and  Management Systems
and Evaluation  will  provide  policy development  and   review  activities,  review
guidance for  Implementing  regulations and   conduct  program evaluations  of  the
Superfund program.
                                        SF-41

-------
1983 Program

     In 1983,  the  Agency  is  allocating a  total  of  $1,432,100  and  7.0  permanent
workyears from  the  Hazardous Substance  Response  Trust Fund  appropriation  to this
program.  These  resources  will  he used  to  fund the  following activities:   the
Office of  the  Comptroller  coordinates  and prepares  OMB  and  Congressional  budget
submissions, and  also  identifies  and  analyzes  major  resource  issues to  support
resource management  decision  making;  the  Office  of  Policy Analysis  prepares  and
analyzes policy  and program  implementation  issues;  the  Office  of  Standards  and
Regulations provides statistical  and  technical  support of  the regulatory  develop-
ment process;  and  the Office of  Management  Systems  and Evaluation  provides  the
program with responsive,  efficient and  effective management  systems  and  accurate
assessment of orogram activities and accomplishments.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982,  the Agency  obligated a total of  SI,225,300 from  the  Hazardous Sub-
stance Response Trust Fund  appropriation  for  this program.   In 1982,  the  Office  of
the Comptroller prepared the  1983 Hazardous Substance  Resoonse Trust Fund  Congres-
sional Budget  submission and the 1984 budget  submission to the Office of Management
and Budget; provided allowances and other budget control mechanisms for 1982 funds;
reviewed and analyzed  1983  operating  plans;  and,  conducted  resource  analyses  on
critical issues  pertaining to  resource  utilization  of  Suoerfund  monies.   These
included:  analysis  and  recommendations  on  improving  obligation patterns  and work-
year charging;   efficient  utilization  of  resources  designated  for  equipment  and
Research and  Development  products;  and,  developing  fund  balance  projections.
The Office of  Policy Analysis supported the  revisions  of the National  Contingency
Plan); assisted in developing implementation guidance and other regulatory actions;
and analyzed numerous major policy and program imolementation  issues.  The  Office
of Management  Systems  and  Evaluation  completed the development  and implementation
of a  comprehensive  tracking and accountability system  for  orogram  and enforcement
activities.  The Office  of Standards  and Regulations  provided  management  control
of the  regulatory  process; technical  support for  regulatory actions; and  served
as liaison with the  Office of Management and  Budget on regulatory activities.  The
resources in the Hazardous Substance  Planning and Evaluation  program element have
been consolidated with this program element.
                                        SF-42

-------
Hardous Substance
 Response Actions
       SECTION TAB

-------
Page Intentionally Blank

-------
                         ENVIRONMENTAL PROTECTION AGENCY

                               1984 Budget Estimate

                                Table"of Contents
SUPERFUND
    HAZARDOUS SUBSTANCE RESPONSE ACTIONS
       Hazardous Substance Response - EPA	,	,	   SF-44
          Hazardous Spill  S Site Response	   SF-45
          Assessing & Replacing Natural  Resources......	   SF-4S
       Hazardous Substance Response - Interagency.. (	   SF-50
          Department of Health & Human Services	   SF-52
          United States Coast Guard...	   SF-52
          Department of Justice.....	   SF-53
          National  OceanograpMc 8 Atmospheric Administration	   SF-53
          Department of Interior....	, — ...—   SF-54
       Hazardous Waste Site Inventory.........	   SF-55
                                      SF-43

-------
                                      SUPERFUND

                          Hazardous Substance Response - EPA

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 19.82    ESTIMATE   ESTIMATE    1984    DECREASE -
                                           1983.       1983             1984 VS 1983

                                (DOLLARS IN THOUSANDS)

PROGRAM
Hazardous Spill £ Site
Response
 Hazardous Substance         $149,009.6 1184,729.9 $150,271.2 S256.345.7 $106,074.5
 Response Trust Fund
                       TOTAL $149,009.6 5184,729.9 5150,271.2 3256,345.7 $106,074.5

Assessing & Replacing
Natural Resources
 Hazardous Substance                      51,007.8   SI,007.8   SI,009.7       51.9
 Response Trust Fund
                       TOTAL              SI,007.8   SI,007.8   SI,009.7       $1.9

TOTAL:
 Hazardous Substance         $149,009.6 $185,737.7 5151,279.0 $257,355.4 $106,076.4
 Response Trust Fund

Hazardous Sub.Stance    TOTAL 5149,009.6 5185,737.7 $151,279.0 5257,355.4 $106,076.4
Response - EPA


PERMANENT WORKYEARS
Hazardous Spill & Site            238.2      243.1      291.9      296.6        4.7
Response

Assessing & Replacing                          1.0        1.0        .1.0
Natural Resources

TOTAL PERMANENT WORKYEARS         238.2      244.1      292-9      297.6        4.7


TOTAL WORKYEARS
Hazardous Spill 4 Site            273.2      285.9      333.9      348.2       14.3
Response

Assessing & Replacing                    ,      1.0        1.0        1.0
Natural Resources

TOTAL WORKYEARS                   273.2      286.9      334.9      349.2       14.3
                                       SF-44

-------
                                     SUPERFUND


        _   Hazardous Substance Response-Environmental Protection Agency


Budget Request

     The Agency  requests  a  total   of  5257,355,400 and  297.6 permanent  workyears
for 1984  from  the Hazardous  Substance Response Trust  Fund appropriation,  an  in-
crease of  5106,076,400  and  4.7  permanent workyears  over  1983.   The  increase  in
dollars reflects  an  increased level of  field implementation, particularly  in  the
resource intensive design and implementation areas.  This 1s in contrast to earlier
years in  which  initial  emphasis  of the  program  was  on developing  basic policies
and guidance for  program implementation  and performing the  necessary preliminary
site planning work.

Program Description

     This nrogram  is responsible  for  protecting  public health  and  the  environ-
ment from  the  dangers associated  with releases of  hazardous substances  into  the
environment.  The  activities  include  responding to  spills  and  emergency  releases
of hazardous substances,  conducting  remedial  work  at abandoned  and  uncontrolled
hazardous waste  sites,  and  assessing  and replacing  natural  resources  damaged  by
hazardous substances.  The authority to  carry out these activities  is provided  by
the Comprehensive  Environmental   Response,  Compensation,   and  Liability  Act  of
1980 (CERCLA).

     Hazardous  Spill  and Site Response  —   The Agency  coordinates   an  emergency
response program to deal  with the most serious hazardous substance spills and site
emergencies where  the responsible  party  or State and local governments are  unable
to respond  adequately.   The  Agency  is also  conducting a comprehensive program  to
evaluate all known  hazardous  waste sites,  to establish  priorities  for  remedial
response, and to  undertake the appropriate  remedy at as  many  sites  as possible.
The Headquarters portion  of  the  program  establishes  the policy  framework, coordi-
nates the  setting  of priorities,  administers the  response  resources,  and provides
implementation  guidance.   The  Regions  have the lead  responsibility  for conducting
all the preliminary  field work to  identify the  problems  and to manage the response
work supported  by  the Trust Fund at spills and sites.

     Assessing and Replacing Natural Resources —  CERCLA authorizes  payments  for
costs associated  with Federal  or State efforts to  restore,  rehabilitate,  replace,
or acquire  the  equivalent of  natural  resources damaged as  a result  of hazardous
substance releases.  The  Agency,  in conjunction with other Federal  agencies, will
determine if significant  or  Irreplaceable damage to  natural  resources has resulted
from a release  of  hazardous  substances,  determine the economic  impact of  any such
damage, evaluate  alternatives for  restoring  or   replacing  these damaged  natural
resources, and finance the costs of restoration or rehabilitation,

HAZARDOUS SPILL ANDSITE RESPONSE

1984 Program Request

     The Agency  requests  a  total   of  $256,345,700 and  296.6 permanent  workyears
from the  Hazardous Substance Response  Trust Fund  appropriation  to conduct removal
and remedial response action  in  1984.   This  is an increase of 5106,074,500  or  71%
and 4.7 permanent  workyears  from  1983.  The  increase  reflects the continued momen-
tum of the program 1n initiating planning work  at  additional  sites on the Priority
List and  proceeding  with  the  more  expensive  implementation   work at  sites  where
planning  is completed.
                                        SF-45

-------
 Removal:   The  Agency expects to  receive  and  screen 5,000 hazardous substances  re-
 lease  notifications  in 1984 to  determine what, if any,  response is  required.   In
 the  majority of cases, the responsible party or the local or  State  government will
 take the  lead  in addressing the problem.  In 1984, the Agency will monitor  respon-
 sible  party and State responses to hazardous substances  releases at 300  incidents,
 a  reduction of  25%  from  1983.   This  decrease  is the  result  of the  increased  ex-
 perience  States will  have  gained  in  managing  response actions  and  the  Agency's
 efforts to have States assume a greater  responsibility  for  managing and  monitoring
 removal actions.  The  Agency  intends to  enter  into  Cooperative  Agreements  and
 provide appropriate  funding to those States who are willing and  able  to  assume  re-
 sponsibility for responding to major releases of hazardous substances.

      In situations  where  more than one State  is involved  or  where there is  an
 unusually complex  problem,  the Federal  government will  coordinate  and fund  the
 response*  In   order  to  meet  this  need, the Federal  government  will continue  to
 maintain  a core emergency  response  capability  in 1984, including an  Environmental
 Response  Team,  comprised  of Agency employees with  special engineering and  scienti-
 fic  expertise.   The  need  for Federally  managed  emergency  actions  is expected  to
 remain constant through  1984.   The Agency  will  undertake 50  emergency  removal
 actions at sites and  spills.

      In addition to  responding to emergencies,  planned  removals  will be taken  where
 an immediate response is  not  critical,  but some early response  is  necessary  to
 protect public  health or the  environment.   The  Agency  will  undertake ten  planned
 removal actions in  1984.   While this is a reduction of five actions from 1983,  the
 number of serious  problem  sites identified in  1984 is expected to decline  reducing
 the  number of  sites  requiring  planned  removal.

 Remedial :  The  Agency's major emphasis in 1984  will be on substantially  increasing
 its  investment  in remedial  activities at  sites.   By the end  of 1984,  the  Agency
 will have finished the screening and assessing  of all  reported uncontrolled  hazard-
 ous  waste sites.  This effort  is necessary to confirm that the sites  on the  priority
 list are  the most  serious.   In  1984,  the more  expensive  implementation  efforts
 will begin at   sites  begun  in  1982 and 1983 and where the planning and design work
'is completed and the  Agency will continue to  initiate remedial investigations  at
 new  sites.  It  is  expected that  the  Agency will  begin  planning  work  at  55  new
 sites  an  increase  of  37% over  the number of sites initiated  in  1983.

     The  funds  provided  as a  result of  the  statute were never intended  to be suf-
 ficient to completely address  all  of  the  known problem  sites.   Therefore, it  is
 essential that  a substantial investment  be made in planning response actions,  en-
 suring that solutions are  both technically  sound and  cost-effective.

     This requires  that detailed  studies  be  undertaken to  characterize the pro-
 blem,  collect   and analyze  the  data  necessary to  determine  the  potential range  of
 solutions, and  to evaluate and  select  the  most  effective  course of   action.   A
 large  scale sample collection, analysis, and evaluation program will  support  field
 activities Involving  over  14,000 samples 1n  1984.   Once this  step  1s  completed,
 the  final  remedial  solution  is  selected,  the  detailed  engineering  design  for  the
 proposed  action is  developed  and  the  actual  implementation  of the solution  is
 carried out by  either the States or  contractors under  the  direction of the Army
 Corps  of  Engineers.

      In  addition to  implementing  and  managing  the technical  aspects of  remedial
 actions,  the Agency  must  negotiate the  required  Cooperative Agreements,  coordin-
 ate  with  the local  jurisdictions  and  the States,  and  involve  the  affected com-
 munities.  These efforts  are necessary  to  meet the requirements of CERCLA  and  the
 National  Contingency Plan  and to ensure  that the  actfons taken at sites  are  clear-
 ly understood  and  generally acceptable to the  affected  communities.
                                        SF-46

-------
     In 1984, the Agency's  continuing  priority will be to  begin  design  and imple-
mentation work at those  sites  where work is  ready  to  proceed.   The Agency expects
to be  able  to initiate designs  at  40  sites  and  implement  remedial  actions  at  22
sites during  1984, approximately  double  the number of  starts  in  1983.  The Agency
will also  initiate  the necessary remedial  investigations  and  feasibility studies
at 55  additional  sites during  1984.  The design  and implementation  of solutions at
these sites  will  be  undertaken  by  the   States' or  Army  Corps  of  Engineers  once
these studies  are completed.   This  will  bring  the total  number  of sites  where
planning for  remedial  work  has  been  initiated  to  approximately  130-140 serious
sites by the end of 1984.

     Finally, at  some  sites,  work   on  the  remedial  investigation  or engineering
design cannot commence or  continue .until  an initial  remedial  measure is  conducted.
This is a  limited action,  such as drum  excavation,  which  must he  taken  to enable
the planning  work to  continuet   The Agency projects  that  it will  be necessary to
conduct 20 initial remedial measures in 1984.

State Participation;;  In 1984,  the Agency will be  making  a  concerted effort to get
as ^nany Stat'es as possib 1 e to participate in on-going response actions.  The Agency
expects that  States  will  enter  into Cooperative Agreements  for  approximately S95
million for  site  response  actions.   This  is an increase of  $47  million or 98S over
1983.  In 1982, the Agency successfully  worked with States  and 60% of the remedial
response dollars  were  obligated  through Cooperative  Agreements  at  State managed
actions.  Efforts will  continue  in 1984  to  encourage  States  to  assume greater
responsibility for  development  and  operation   of their  own  response   programs.
This will  include providing advice and  guidance on  organizing  response capability,
reviewing and  suggesting  improvement in  technical  resources and  staff,  developing
removal and remedial  manuals and instructions, identifying technical and health and
safety training  needs,  and assisting in determining possible  financial  mechanisms
States can adopt to support their current and future activities.

Interagency Support:  Finally, resources  in  support of the incident-specific activi-
ties of other  agendes  will  be provided  through  reimbursable agreements.  Examples
of incidentspeciflc  activities that may be  performed  by  other  agencies include
studies at priority sites by the Department of Health and Human Services,  permanent
relocation of  individuals  at  priority  sites by  the Federal  Emergency  Management
Agency, and  the  U.S.  Coast Guard  response  to hazardous  spill  Incidents   occurring
in coastal waters.  These  actions will  be  triggered by  Agency  on-scene  personnel.
The other agencies  will  be reimbursed once their  specific actions  are  completed.

1983Program

     In 1983, the Agency  is  allocating a  total of  $150,271,200 and 291.9  workyears
from the  Hazardous  Substance  Response Trust  Fund  appropriation  for this program.
The Agency's  energies  will be  directed  toward  carrying  out  the  program's primary
mission of effective  field response at  both spills and  uncontrolled or  abandoned
sites.  The  National Priority  List was proposed  in December 1982.  The majority of
work in 1983  will  be  geared toward  initiating  the necessary  studies at the worst
sites and  responding  to those  emergencies  where  a  Federal response  is   required.

Removal:  The  Agency will  direct the response at  50 major  hazardous substance re-
1 eases and  15  planned  removals and  provide on-scene assistance at 400 releases of
hazardous substances.  In  addition,  the  regulatory and guidance  framework will  be
completed for the removal  program including:  promulgation  of  final  regulations on
CERCLA notification and  reportable  quantities;  issuance of  policy  on  continuous
releases; and  promulgation  of regulations  on designations  of additional   hazardous
Substances.
                                       SF-47

-------
Remedial:  In 1983, the Agency will focus its remedial  efforts on initiating feasi-
bility studies  at  the most  serious  sites on  the  priority list, and  begin design
and implementation  at  sites  which are  ready  to proceed.   Work will  continue to
assess the known universe of sites begun in 1982.

     Specific site  activities  will  include  the  performance  of  4,000 preliminary
assessments of  sites and  2,000  site  inspections;  initiation  of remedial investiga-
tions and feasibility  studies at  40  sites; initiation  of engineering designs at 24
sites and remedial actions at 11 sites; and initiation  of initial remedial  measures
at 15 sites.

     As in 1984,  site  specific work  undertaken  by other agencies  in  1983 will be
funded under reimbursable agreements when requested by  on-scene personnel.

1983 Explanation of Changes from Budget Estimate

     The net decrease of ^$34,458,700 results from the  following actions:

     -Congressional Action.  (-334,708,000)  A  Congressionally  mandated reprogram-
ming o?resourcesFnthe Hazardous  Substance  Response Trust  Fund  appropriation
required a reduction to  this  program.   This  reprogramming increased the Department
of Health and  Human Services  for Superfund  related activities by  +54,708,000 to
reach the Congressionally mandated  level  of  $8.0 million; provided  $10 million to
support State activities  in  continuing hazardous waste  site  surveys  under Section
3012 of the RCRA Act; and, reduced the Superfund program by $20 million.

     -Reprogratmiings.  (+$249,300)   During the development of  the  operating plan,
several reprogrammings were  made  to this activity  which are not  reportable under
the Congressional reprogramming limitations.

1982 Accomplishments

     In 1982, of  the  monies  available from the  Hazardous  Substance Response Trust
Fund appropriation  for response actions, including  carryover, the Agency obligated
a total of $149,009,600  or 91% of the  dollars  available for this program  element.
Operations were directed at formulating the basic operating policies and establish-
ing the implementation nechanisms  for the program.   By the end of 1982, the Agency
had promulgated  the National  Contingency Plan,  developed  Interagency Agreements
with the Corps  of Engineers and other Federal  agencies, awarded Cooperative Agree-
ments with 18  States  and awarded the  major  contract  support  for remedial action.
The Agency had  designated  160  sites as  priority  sites and remedial  work  had been
initiated or continued at 59 sites.

     Specific accomplishments in  1982  included the processing  of  over 4,400 noti-
fications of  spills of  hazardous substances; directing 50  immediate  removals at
major hazardous incidents and one planned removal where State and local authorities
lacked the necessary expertise  and the  responsible party  could not be identified,
refused to respond, or was incapable of  adequate  removal; monitoring 400  removals
of hazardous  substances  carried  out  by the  responsible party or  State  and local
authorities; conducting  1,500  preliminary   assessments   of   sites  and  performing
1,300 site inspections;  and  Initiating  31 remedial  investigations  and feasibility
studies, eight  engineering designs, and  14 remedial actions.

     The Agency's  efforts in  implementing  the  Superfund  program were  supported
through reimbursable  agreements  with  other  Federal agencies.   The  Department of
Justice used Superfund resources to carry out hazardous waste litigation activities.
The U.S. Coast  Guard used Superfund resources for equipment purchases and personnel
                                        SF-48

-------
training.  The Department of Commerce used  Superfund  resources  for the  purchase  of
equipment that will  support natural  resource  damage assessments.   The Department
of Health and  Human Services  used  Superfund resources  for scientific  support  to
the Regions and States  for emergency response guidance and for site-specific studies
and assessments.   These Agencies also participated  in  incident-specific activities
supporting Agency initiated response actions.

ASSESSING AND REPLACING NATURAL RESOURCES

1984 Program Request

     The Agency requests  a  total of 51,009,700  and  1.0 permanent  workyear from the
Hazardous Substance  Response  Trust Fund  appropriation  for  this program.   These
resources can support up to two damage assessments and one restoration.

1983 Program

     In 1983,  the  Agency  is allocating a  total  of  $1,007,800 and  1.0  permanent
workyear from  the  Hazardous Substance  Response Trust Fund appropriation  to  this
program, an  increase of  SI,900.    These  resources can  support  up to  two damage
assessments and one restoration.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982,  no  funds  were  obligated  for this  program  because  no  claims  were
received.
                                        SF-49

-------
                                      SUPERFUND

                      Hazardous Substance Response - Interagency

                                ACTUAL   BUDGET     CURRENT   ESTIMATE  INCREASE +
                                 1982    ESTIMATE   ESTIMATE     1984     DECREASE -
                                           1983       1983             1984 VS  1983

                                (DOLLARS IN THOUSANDS)
PROGRAM
Department of Health &
Human Services
 Hazardous Substance
 Response Trust Fund
United States Coast
Guard
 Hazardous Substance
 Response Trust Fund
Department of Justice
 Hazardous Substance
 Response Trust Fund
                       TOTAL
                       TOTAL
                       TOTAL
National Qceanographic
& Atmospheric
Administration
 Hazardous Substance
 Response Trust Fund
                       TOTAL
Department of Interior
 Hazardous Substance
 Response Trust Fund
                       TOTAL

TOTAL:
 Hazardous Substance
 Response Trust Fund

Hazardous Substance    TOTAL
Response - Interagency
S3,292.0   $8,000.0   $1,905.0  -$6,095.0

53,292.0   SB,000.0   51,905.0  -56,095.0



SI,514.8   $1,514.8   S3,674.4   52,159.6

SI,514.8   SI,514.8   $3,674.4   $2,159.6


$2,100.0   $2,100.0   $2,644.0     S544.0

52,100.0   52,100.0   $2,644.0     5544.0
  $365.0     $365.0               -S365.0

  5365.0     $365.0               -S365.0


                         S80.0      580.0

                         S80.0      S80.0


$7,271.8  Sll.979.8   $8,303.4  -$3,676.4


57,271.8  511,979.8   $8,303.4  -$3,676.4
                                       SF-50

-------
                                     SUPERFUND

                      Hazardous Substance Response-Interagency
Budget Request
     The Agency  requests  a total  of 58,303,400  for  Hazardous  Substance  Response
Interagency activities In  1984,  a  decrease of 53,676,400 from  1983.   The  decrease
reflects the availability  of previous year  funding provided  during  1983  to  sup-
port the completion of onetime guidance-related activities.  The requested resources
will support  the  on-going  Superfund program  activities  of  the  Department  of
Health and Human Services,  the United States Coast Guard, the Deoartraent of Justice,
the National Oceanographic and Atmospheric Administration,  and the  Department  of
Interior,

Program Description

     Executive Order  12316,  signed by the President  in August  198.1,  requires the
Agency to nauage an  interagency  budget process culminating in  a consolidated  bud*-
get request  for  the  entire Superfund program  to  the  Congress.  The  activities  of
other Federal agencies are divided into  two basic categories.   The first  category
includes those activities  which  are  episodic in  nature  and  taken in direct support
of specific  site or  spill  response actions.   Funds to  support these  activities are
included in  the  Hazardous   Spill  and  Site  Response program  element.  The  second
category of  other  Federal   agency  involvement  is  support for  on-going  activities
which are  generally   not  incident-snecific.   These  activities  include  developing
program policies and  guidance,  conducting  health research  and training,  and the
purchase and maintenance of equipment.

      Department of Health and Human Services (HHS)  -- Executive Order 12316 gives
the Department of Health and Human  Services authority to  investigate  complaints  of
illness or  disease related  to  exposure  to hazardous  substances, conduct health
studies and  surveys, develop  appropriate  testing for  exposed  individuals,  and
develop and  maintain  information on  health  effects of toxic  substances.   EPA  is
working closely  with  HHS  to  develop policies and  procedures  to ensure a coordi-
nated Federal aporoach in  conducting thesg activities.

     United  States Coast Guard (USCG) — The USCG has  the authority  to  respond  to
any release  or threatened  release  involving the coastal  zone,  Great  Lakes waters,
ports, and  harbors.   USCG  provides training to maintain  this  response capability,
conducts enforcement  activities  as  necessary in  their  areas   of  responsibility,
and maintains the CERCLA component of the National Response Center.

     Department of Justice  (DOJ)—  Executive  Order  12316 gives  the  Attorney  Gen-
eral responsibility  for  the conduct  and  control  of  all  litigation  arising under
CERCLA.  EPA will  prepare  the  required technical and legal documentation  and  will
cooperate with DOJ  in the negotiation  of  consent decrees for privately-financed
response actions.

     National Oceanographic and Atmospheric:Administration (NOAA)  --  The  National
Contingency  Plan designates  NtiAA as  Federal  Trustee for  certain natural  resources
which nay be lost  or damaged as a result  of hazardous  substance discharges.  NOAA
provides scientific  and  technical  support  for responses to  spills  and  hazardous
materials in coastal waters.

     Department of Interior (DPI) ~  The National  Contingency  Plan  designates DOI
as Federal  Trustee  for  certain  natural  resources lost or  damaged as a  result  of
hazardous substance discharges.  Additionally, DOI has the responsibility to develop
damage assessment  regulations.   Funds to  support these activities are included in
the Department's  budget.    DOI  provides scientific  and  technical  support  in the
areas of resource  damage assessment  through participation on  Joint Response Teams.
                                        SF-51

-------
DEPARTMENT OF HEALTH AND HUMAN SERVICES(HHS)

1984 Program Request

     The Agency requests  a total  of  $1,905,000 from  the Hazardous Substance  Re-
sponse Trust  Fund  appropriation for  HHS's   on-going  activities  during  1984.   The
decrease of  $6,095,000  reflects  the  availability  of previous  year  funding  pro-
vided during 1983 to  support  the completion of onetime  guidance-related and  other
startup activities.    These  resources  will  enable  HHS to  support  the  Headquarters
and field core  staff necessary  to  provide  scientific and technical advice  to  EPA
on-scene coordinators when  assessing  the public  health  hazard at  priority  sites,
and to  review  environmental  test  results for  indications of  human  health  hazard.
HHS will also  provide on-going health related  field  guidance and  laboratory  sup-
port at emergency responses.

1983 program

     In 1983,  the  Agency is  allocating  a  total  of 58,000,000  from the Hazardous
Substance Response  Trust Fund  appropriation for  HHS's   on-going  activities.   In
addition to these 1983 funds,  HHS still has approximately $4,000,000 in obligational
authority remaining  and available  from  Its 1982  appropriation.  These  resources
include the  amount  Congress  added for  on-going  Superfund  related activities  of
the HHS.  The  Department is  collecting the information  and  developing  the  proce-
dures necessary  to   provide   continuing  health-related  support to  the  Superfund
program.  Included are  development  of health-related  field guidance in  support of
Agency emergency  response  actions,  and   standard   guidelines  for   the  conduct  of
health and epidemiological studies  at priority sites; production  of worker  health
and safety technical  guidance and  field  manuals for  individuals  involved in  re-
sponse actions; and,  toxicological  testing  of  chemicals  found at  priority  sites,

1983 Explanation of Changes from Budget Estimate

     The net increase of +$4,708,000 results from the  following action:

     -Congressional  Action.   (+$4,708,000)   A  Congressionally mandated  reprogram-
ming of 'resources Tnthe' Hazardous  Substance Response  Trust Fund  appropriation
required an  addition to  this  program.   This  reprogramming  supports  S8  mil lion
for use  of  the  Department of  Health and  Human  Services  for on-going  Superfund
related activities.    In  addition to these 1983 funds, HHS still has approximately
$4,000,000 in  obligational authority  remaining and available  from  its 1982  appro-
priation.  Additionally, Congress  mandated  $2,000,000 which may be  made available
by the  Administrator  to the  Department for performance  of specific  activities in
accordance with  Section lll(c)(4)  of  the   Comprehensive  Environmental  Response,
Compensation, and  Liability   Act  (CERCLA),   These  funds  would  be provided,  if
necessary, from the Hazardous Substance Response program element.

1982_ Accomplishments

     In 1982, all funds  obligated  from the  Hazardous  Substance Response Trust Fund
appropriation by HHS were in the Hazardous Spill and Site Response  program element.
HHS provided  scientific  support  and emergency  response guidance and  conducted
health assessments at certain sites.

UNITED STATES COAST GUARD (USC6)
1984 Program Request

     The Agency  requests  a total  of $3,674,400  from  the Hazardous  Substance  Re-
sponse Trust Fund appropriation for on-going activities.  The increase of $2,159,600
will provide contract support  for  teams  to respond to releases which are immediately
                                       SF-52

-------
dangerous to life and health.  The U.SC6 will ensure CERCLA financial responsibility
requirements are met; train  emergency  response  personnel  using program modules and
simulation drills; staff the CERCLA component of the National Response Center; and,
maintain records of characteristics for certain chemicals.

1983 Program

     In 1983, the  Agency is  allocating  a  total  of 31,514,800  from the Hazardous
Substance Response Trust Fund appropriation  for this program  which  will  be used to
purchase safety equipment and  to  provide response training  for  USCG personnel  and
to upgrade capabilities  at  the National  Response Center  and  field  data  systems in
support of USCG initiated response programs.

1983 Explanation of Changes from Budget Estimate

     There was no change to this program.

1982 Accptnpl i shments

     In 1982,  all   funds  obligated  from the  Hazardous  Substance   Response  Trust
Fund appropriation  by  USCG  were in the  Hazardous  Spill  and  Site  Response program
element.  They were utilized for staff support and personnel  training.

DEPARTMENT Of;, JUSTICE (DOJ)

1984 Program Request

     The Agency  requests  a  total  of  $2,644,000 from  the Hazardous  Substance  Re-
sponse Trust Fund   appropriation.   The  increase  of  $544,000 will   support  entry
of Suoerfund cases  into the  DOJ  automated  litigation  system.  The  Department of
Justice will provide legal  advice  and  bring legal  action pursuant  to the Superfund
legislation.

1983 Program

     In 1983,  the  Agency is  allocating  a  total  of 52,100,000  from the Hazardous
Substance Response  Trust Fund appropriation  for  this  program.  The Department of
Justice is" providing  civil  and  criminal  enforcement  litigation   which  includes
counseling on and enforcement  of Administrative Orders,  warrant for entry,  insti-
tution of  suits  to  compel  removal  and  remedial  actions, and to  recover  response
costs incurred by the Fund.

1983 Explanation of Changesfrom Budget Estimate

     There was no change to this program.

1982 Accomplishments

     In 1982,  all   funds  obligated  from the  Hazardous  Substance  Response  Trust
Fund appropriation  by  DOJ  were  in the  Hazardous  Spill  and  Site  Response program
element.  They were used for litigation  and  other enforcement-related activities.

NATIONAL PCEAMOGRAPHIC AND  ATMOSPHERIC ADMINISTRATION (NOAA)

1984 P rqgram Reques t

     In 1984,  the  resources required  from  the Hazardous  Substance Response Trust
Fund appropriation  to  support  NOAA activities will  be  provided  as  necessary on
a reimbursable  basis with  the funds  contained  in  the  Hazardous  Spill  and  Site
Response program element.
                                       SF-53

-------
1983 Program
     In 1983,  the  Agency   Is  allocating  from  the  Hazardous   Substance  Response
Trust Fund appropriation a  total  of $365,000 for  this  program to provide training
for the  scientific  response  team,  to  purchase  and maintain  protective equipment
for personnel and, to maintain field Instrumentation.
1983 Explanation of Changes from Budget Estimate
     There was no change to this program.
1982 Accomplishments
     In 1982,  all  funds obligated  by  NOAA  were in  the  Hazardous Spill  and Site
Response program  element.   They  were  used  to  purchase  equipment and  to prepare
for conducting natural resource damage assessments.
DEPARTMENT OF  INTERIOR (DPI)
1984 Program Request
     The Agency requests a  total  of $80,000 from  the Hazardous Substance Response
Trust Fund appropriation for  this program which will  enable  DOI to participate on
the Regional   and  Joint  Response Team by providing damage  assessment  expertise.
19.83 Program
     In 1983,  the  activities   of  DOI  funded  by the Hazardous  Substance  Response
Trust Fund appropriation  are  under the  Hazardous  Spill and  Site Response program
element.  In  1983,  the DOI is establishing and  maintaining a  capability to par-
ticipate on  the  Regional  and  Joint Response Team by  providing damage  assessment
expertise.
1983 Explanation of Changes from Budget Estimate
     There was no change to this program.
1982 Accomplishments
     In 1982,  no funds were obligated  for this program.
                                        SF-54

-------
                                      SUPERFUND

                            Hazardous Waste Site Inventory
ACTUAL
 1982
BUDGET
.ESTIMATE
  1983
                             CURRENT
                             ESTIMATE
                               1983
                                                              ESTIMATE   INCREASE  +
                                                                1984     DECREASE  -
                                                                       1984 VS  1983
PROGRAM
                                (DOLLARS IN THOUSANDS)
Hazardous Waste Site
Inventory
 Hazardous Substance
 Response Trust Fund
TOTAL:
 Hazardous Substance
 Response Trust Fund

Hazardous Waste Site
Inventory
                       TOTAL
TOTAL
           510,000.0

           $10,000.0


           $10,000.0


           510,000.0
                                        -510,000.0

                                        -S10,000.0


                                        -$10,000.0


                                        -S10,000.0
                                       SF-55

-------
                                     SUPERFUNO


                           Hazardous Waste Site Inventory


Budget Request

     No funds are requested for this activity in 1984.

Program Description

     This is a  one-year Congressionally mandated program to  support  State hazard-
ous substances  activities  under  Section  3012  of  the  Resource Conservation  and
Recovery Act {RCRA).

     Hazardous Haste Site Inventory -- This  program provides  financial  assistance
to Statesfor  assessment and  inspections  of  hazardous  waste sites  under  Section
3012 of the  Resource  Conservation and Recovery Act (RCRA).   In  1983, the Congress
earmarked SIO.000,000 for these purposes.

HAZARDOUS WAgTEJSITE_ INYENTORY

1984 Program Request

     The Agency  requests no  funds for this  activity  in  1984.  The work  that  will
be undertaken by the  States  with the  monies provided in 1983 along  with  the  site
identification and  screening  efforts  of the Agency will  satisfy the  need  to  com-
plete a comprehensive site inventory.

1983 Program

     In 1983, the  Agency is  allocating  a total  of $10,000,000  for  this program.
The Congress earmarked these funds to support State hazardous waste site activities
including preliminary assessments,  inspections,  responsible  party searches, inven-
tory completion,  and  collection  of  additional  information  to   characterize  site
problems.  A regulation is  being promulgated describing the policies and procedures
for a State to receive some share of the available resources.

1983 Explanation of Changes from Budget Estimate

     The net increase of +$10,000,000 results from the following action:

     -Congressional Action.  (+$10,000,000)  The Congress mandated  a  reprogramming
of resources  in the  Hazardous  Substance  Response  Trust  Fund   appropriation  and
directed that S10  million  be  provided to support  State activities  in continuing
hazardous waste  site  surveys  under Section  3012  of the  RCRA Act.   This  program
element was established to meet this requirement.

1982 Accomplisnments

     In 1982, no funds were obligated for this program.
                                        SF-56

-------
Special Analyses
      SECTION TAB

-------
Page Intentionally Blank

-------
                                       ENVIRONMENTAL PROTECTION AGENCY

                                               SPECIAL ANALYSES

                                              Table of Contents


                                                                                                      Page

EPA Organi zation Chart	..	      SA-2

EPA Regional Offices -Locations...		...      SA-3

Summary of Resources, By Appropriation	...	      SA-4

Summary of Resources, Dy Media	.	      SA-7

Workyears and Budget Authority, Dy Media and Appropriation, 1-583	»	      SA-11

Workyears and Budget Authority, By Media and Appropriation, 1904.....	      SA-12

Total  Funds Obligated, 1983			      SA-13

Total  Funds Obligated, 1984....	      SA-15

Summary of State Grant Resources	      SA-17

History of State Grant Budget Authority	-..-	      SA-18

Positions by Grade and Average Employment	*	      SA-20

Classification by Object;
     Research and Oevel opment.	      SA-23
     Abatement, Control  and Compliance			      SA-26
     Salaries and Expenses	.	      SA-30
     Buildings and Facilities	-..	      SA-36
     Scientffie Activities Overseas.	      SA-38
     Hazardous Substance Response Trust Fund.	      SA-39

-------
U.S. ENVIRONMENTAL PROTECTION AGENCY

ADMiNISTRATOn
DEPUTY ADMINISTRATOR
CHIEF OF sr*(=r

1 1 I
STRMIVt
JUDGES
OFFICtn? OfttCt Of Sa*ttAHO 5CIEi*Cf AOVJSOBV
CtVIl WSAp»AfHAT,tO BUAftO
HfOHfl HUSIKEiS

A
f

1
S90CtATC AOMIttfSTnATOn
CHI PQilCV AND FtCSOUttCC
MANAGEMENT
r-


I 01 PWf OF
^J-^ STANDARDS ANO
j|^ « GUI* rums
1 OfFfCt Of
•Mtai MAMAOEmNf SVSTIMS
ANQ(VAtUATK>N


k I 1
DMIHISrgATOJI

FKCOr
ice or
IQCHCNf
MANAQtMfN
ATIONAN0
F ICE OF
NITRATION
:mNArt

rtcf or
ISTRAfHSM
t PAftK/N.C.







ASMSf ANT AOMWISf ft A TOR
FOR KAUft

OFFKI or
AKQ PCAMITS
OffKf Of
AM1STANDAHIM
0«HATIOWI
w OFF i« or

USIIfAJtf ADMHvnTRArOH
rORSOIWRASft AW

Off »Ct 
-------
                                             -ENVIRONMENTAL PROTECTION AGENCY

                                                         REGIONS
                                                  Locations atul States
Region I    Headquarters, Boston,, Massachusetts
            Connecticut, Maine, Massachusetts,
            New Hampshire, Rhode Island, Vermont

Region II   Headquarters, New York, New York
            New Jersey, New York, Puerto Rico
            Virgin Islands

Region III  Headquarters, Philadelphia, Pennsylvania
            Delaware, Maryland, Pennsylvania,
            Virginia, West Virginia, District of Columbia

Region IV   Headquarters, Atlanta, Georgia
            Alabama, Florida, Georgia,  Kentucky,
            Mississippi, North Carolina, South Carolina,
            Tennessee

Region V    Headquarters, Chicago, 111inois
            Illinois, Indiana, Michigan, Minnesota
            Ohio, Wisconsin
Region VI    Headquarters, Dallas, Texas
             Arkansas, Mew Mexico, Texas, Oklahoma
             Louisiana

Region VII   Headquarters, Kansas City,  Missouri
             Iowa, Kansas, Missouri,Nebraska
Region VIII  Headquarters. Denver, Colorado
             Colorada,Montana, North Dakota
             South Dakota, Utah, Wyoming

Region IX    Headquarters, San Franc1sco, Callfornia
             Arizona, Californla, Hawaii, Nevada,
             American Samoa, Guam, Trust Territories
             of Pacific Islands, Northern Mariana Island

Region X     Headquarters. Seattle, Washington
             Alaska, Idalio, Oregon, Washington

-------
                                       ENVIRONMENTAL PROTECT'!OH AGENCY

                                             Summary of Resources
                                               By Appropriation
                                            (dollars in thousands)
                                                    Actual
                                                     1982
                  Current
                  Estimate
                    1983
                   Estimate
                     1904
                  Increase +
                  Decrease -
                  1984 vs 1983
I/I
I
•*>
Research and Development
  BudgeFAuthority...	
  Obligations	,
  On tl ays	

Abatement, Control and Compliance
  Ruffgef ""All thor 1 ty 7. .7.	
  Obi Igations	
  Outlays	

Sal aHe s and Expenses  ,,
  Budget Author? tyT.	
  Obi i ga tl on s	
  Outl ay s	-	
  Permanent Work years	
  Total Workyears	

Hulldings and Fad!ities
  Budget Autnor 1 ty	
  Obi 1 gallons	
  Ou tl ay s	

Construction Grants
  Budget Au€HorfiyY.	
  Obi igations	•	
  Ou tl ay s	

Scientific Activities Oversea^
  ODyigatlons....... .""V77T7"	/.
  Outlays	
 $154,315.6
  200,637.9
  197,339.0
  372,969.7
  393,328.0
  523,722.0
  555,105.7
  540,773.2
  520,363.0
    9,112.4
   10,853.5
    3,621.0
    3,384.7
    3,325.0
2,400,000.0
2,116,802.7
3,756,152.1
       19.3
      677.0
 $119,000.0
  126,014.0
  153,709.0
  369,075.0
  375,000.0
  423,538.0
  548,613.2
  548,613.2
  518,904.0
    8,442.4
   10,157.6
    3,000.0
    5,033.0
    2,825.0
2,430,000.0
3,000,000.0
3,100,000.0
      700.0
    1,000.0
 $111,669.0
  112,434.0
  140,764.0
  293,933.0
  294,871.0
  366,359.0
  540,389.0
  540,389.0
  518,533.0
    7,996.8
    9,678.7
    2,600.0
    2,965.0
    4,689.0
2,400,000.0
2,400,000.0
2,800,000.0
      950.0
      600.0
 -$7,331.0
 -13,580.0
 -12,945.0
 -75,142.0
 -00,129.0
 -57,179.0
  -8,224.2
  -8,224.2
    -371.0
    -445.6
    -478.9
    -400.0
  -2,068.0
  +1,864.0
 -30,000.0
-600,000.0
-300,000.0
    +250.0
    -400.0

-------
                                                                    Actual
                                                                     1982
                                                                 Current
                                                                 Estimate
                                                                   1983
                 Estimate
                   1984
                Increase +
                Decrease -
                1984 vs 1983
in
-s>
I
Operations, Research and Facilities
  Obiigations................."..,...
  Outl ays	

Revo]y1ng Fund
  Obligations.	
  Outlays..	

Enforcement
  Outlays..	

U.S. Regulatory Council
  Outlays...		,	

Misc. Contributed Funds
  Obligations....	..	
  Outlays	

Reimbursements
  Obligations.	
  Permanent Work years	
  Total Workyears	

Hazardous Substance Response
 trust Fund
 "Budget Authori ty	•-.	
  Obi Igatlons	
  Outl ays	
  Permanent Workyears.	
  Total Workyears	
                                                                     814.4
                                                                     289.0
                                                                     750.0
                                                                      21.0
                                                                   1,598.0
                                                                     245.0
                                                                      ?2.7
                                                                      12.0
                                                                  15,480.9
                                                                      54.4
                                                                      60.5
                                                                 190,000.0
                                                                 180,743.6
                                                                  79,576.0
                                                                     465.6
                                                                     527.7
  1,432.7
  1,633.0
    800.0
    100.0
  1,002.0
    319.0
     30.0
     20.0
 20,000.0
     58.8
     67.8
210,000.0
240,476.0
177,000.0
    623.8
    699.6
  1,439.0
    800.0
    100.0
  -1,432.7
    -194.0
     20.0
     20.0
 20,000.0
     53.0
     62.0
310,000.0
319,870.0
269,000.0
    619.3
    707.1
  -1,002.0


    -319.0


     -10.0
      -5.8
      -5.8
+100,000.0
 +79,394.0
 +92,000.0
      -4.5
      +7.5

-------
                                                    Actual
                                                     1982
                   Current
                   Estimate
                     1983
                    Estimate
                      1984
                   Increase +
                   Decrease -
                   1984 vs 1983
Payment to HazardousSubstance
  isponseTrust FuncT
  Budget Authority.
  Obligations	
  Outlays	
TOTAL ENVIRONMENTAL PROTECTION
TSGEflCl	
  Budget Authority....
  Obligations....	
  Outlays.	
  Permanent Workyears.
  Total Workyears.
   (26,000.0)
   (26,000.0)
   (26,000.0)
$3,676,012.0
 3,452,757.4
 5,083,319.1
     9,632.4
    11,441.7
   (40,000.0)
   (40,000.0)
   (40,000.0)
$3,679,688.2
 4,318,098.9
 4,380,050.0
     9,125.0
    10,925.0
   (44,000.0)
   (44,000.0)
   (44,000.0)
$3,658,591.0
 3,692,299.0
 4,101,504.0
     8,669.1
    10,447.8
 (+4,000.0)
 (+4,000.0)
 (+4,000.0)
-$21,097.2
-625,799.9
-278,546.0
    -455.9
    -477.2

-------
                                       ENVIRONMENTAL PROTECTION AGENCY

                                             Summary of Resources
                                                   By Media
                                            (dollars In thousands)
Air
  Budget Authority....
  Obligations	
  Outlays	
  Permanent Workyears.
  Total Workyears	

Water Quality
  Budget Authority....
  Obligations....	
  Outlays	
  Permanent Workyears.
  Total Workyears	

Drinking Water
  Budget Authority	
  Obligations	
  Outlays...	
  Permanent Workyears.
  Total Workyears	

Hazardous Waste
  Budget Authori ty....
  Obligations	
  Outlays...	
  Permanent Workyears.
  Total Workyears	
                                                    Actual
                                                     1982
$217,548.5
 229,703.1
 245,652.0
   1,576.0
   1.821.8
 234,720.4
 250,946.2
 314,122.0
   2,271.9
   2.671.1
  82,281.7
  85,898.7
  80,715.0
     474.3
     566.4
 106,777.7
 110,578.4
 123,514.0
     586.1
     737.9
                 Current
                 Estimate
                   1983
$212.245.3
 214,902.3
 195,753.0
   1,374.4
   1,603.2
 215,998.9
 219,138.9
 255,108,0
   1,950.6
   2,379.3
  77,958.5
  78,820.5
  76,760.0
     471.2
     562.4
 116,551.5
 117.244.5
 115,722.0
     643.1
     821.9
                  Estimate
                    1984
$190,991.6
 191,337.6
 199,621.0
   1,350.3
   1,577.1
 151,369.3
 151,818.3
 205,682.0
   1,662.9
   2,065.5
  66,355.9
  66,467.9
  73,568.0
     465.1
     560.8
 110,112.7
 110,194.7
 114,192.0
     625.8
     830.0
                 Increase +
                 Decrease -
                 1984 vs 1983
-$21,253.7
 -23,564.7
  +3,868.0
     -24.1
     -26.1
 -64,629.6
 -67,320.6
 -49,426.0
    -287.7
    -313.8
 -11,602.6
 -12,352.6
  -3,192.0
      -6.1
      -1.6
  -6,438.8
  -7,
  -1,
049.8
530.0
-17.3
 +8.1

-------
I
00
Pesticides
  Budget Authority	
  Obligations	
  Outlays	
  Permanent Workyears
  Total  Workyears.	

Radiation
  Budget Authorl ty	
  Obligations	
  Outlays	
  Permanent Workyears....
  Total  Workyears..	

Noise
  EJuHget Authorl ty.......
  Obligations	
  Outlays	
  Permanent Workyears..,..
  Total  Workyears	«.

Interdisciplinary
  Budget Authority.	
  Obligations	
  Outlays	
  Permanent Workyears....
  Total  Workyears..	

Toxic Substances
  Budget Authority.......
  Obligations	
  Outlays	
  Permanent Workyears....
  Total  Workyears..	
                                                                   Actual
                                                                     1982
                                                                  54,083.0
                                                                  57,813.6
                                                                  61,435.0
                                                                    765.3
                                                                    828.3
                                                                  10,663.3
                                                                  12,335.4
                                                                  12,349.0
                                                                     150.3
                                                                     169.6
1,922.6
1,621.3
6,616.0
   21.2
   27.4
                                                                  18,850.0
                                                                  16,928.9
                                                                  14,425.0
                                                                     200.2
                                                                     243.9
                                                                  74,855.8
                                                                  82,712.8
                                                                  82,211.0
                                                                     634.4
                                                                     729.5
                                                                 Current
                                                                 Estimate
                                                                   1983
              52,928.1
              52,978.1
              53,074.0
                 662.2
                 745.8
              10,923.3
              11,059.3
              12,483.0
                 148.1
                 172.2
                                                                                  1,707.0
              23,935.9
              25,606.9
              22,979.0
                 325.6
                 388.8
              69,661.8
              71,451.8
              79,915.0
                 626.7
                 706.9
                              Estimate
                                1984
52,742.6
52,750.6
53,430.0
   652.7
   736.9
10,854.8
10,872.8
11,419.0
   126.9
   146.4
   663.0
41,335.6
41,595.6
29,098.0
   353.4
   396.5
66,675.7
66,891.7
71,368.0
   606.2
   683.2
               Increase +
               Decrease -
               1984 vs 1983
   -185.5
   -227.5
   +356.0
     -9.5
     -8.9
    -68.5
   -186.5
 -1,064.0
    -21.2
    -25.8
 -1,044.0
+17,399,7
+15,988.7
 +6,119.0
    +27.8
     +7.7
 -2,986.1
 -4,560.1
 -8,547.0
    -20.5
    -23.7

-------
                                                                 Current                        Increase +
                                                    Actual       Estimate        Estimate       Decrease -
                                                     19B2          1983            1984         1984 vs 1983

Energy
  Budget Authority.....	          51,650.9       25,000.9        23,530.1         -1,470.8
  Obligations		          65,662.9       26,940.9        23,742.1         -3,198.8
  Outlays		          90,638.0       56,424.0        42,153.0        -14,271.0
  Permanent Workyears		             138.9           36.4            36.8              +.4
  Total Workyears		             196.9           53.5            54.9             +1.4

Management and Support
  Budget Authority.....		.	         229,037.1      231,484.0       232,022.7           +538,7
  Obligations.....	         221,352.2      232,916.7       232,022.7           +538.7
  Outlays		         211,634.0      228,861.0       225,901.0         -2,960.0
  Permanent Workyears		           2,293.8        2,204.1         2,116.7            -87.4
  Total Workyears...	           2,860.7        2,723.6         2,627.4            -96.2

Buildings and Facilities
  Budget Authority..	           3,621.0        3,000.0         2,600.0           -400,0
  Obligations.	           3,384.7        5,033.0         2,965.0         -2,068.0
  Outlays	           3,325.0        2,825.0         4,689.0         +1,864,0

Construction Grants
 Budget Authority..	       2,400,000.0    2,430,000.0     2,400,000.0        -30,000.0
 Obligations	       2,116,802.7    3,000,000.0     2,400,000.0       -600,000.0
 Outlays	.,		       3,756,152.1    3,100,000.0     2,800,000.0       -300,000,0

Scientific Activities Overseas
  Obligations..	.		              19.3          700.0           950.0           +250.0
  Outlays	             677.0        1,000.0           600.0           -400.0

Revolving Fund
  Obligations.	             750.0          800.0           800.0
  Outlays			              21,0          100.0           100.0

Hisc. Contributed Funds
  Obligations..	              22.7           30.0            20.0            -10.0
  Outlays		,	              12.0           20.0            20.0

-------
                                                                 Current                        Increase +
                                                    Actual       Estimate        Estimate       Decrease -
                                                     1982          1983            1984         1984 ys 1983

Reimbursements
  Obligations.	          15,480.9       20,000.0        20,000.0
  Permanent Workyears...	              54.4           58.8            53.0             -5.8
  Total  Workyears.	              60.5           67.8            62.0             -5.8

U.S. Regulatory Council
  outlays I..,...::..:...	             245.0          319.0             ...           -319.0

Hazardous Substance Response
 Trust Fund
  budget Authority	         190,000.0      210,000.0       310,000.0       +100,000.0
  Obligations	         180,743.6      240,476.0       319,870.0        +79,394.0
  Outlays	          79,576.0      177,000.0       269,000.0        +92,000.0
  Permanent Workyears	             465.6          623.8           619.3             -4.5
  Total  Workyears	             527.7          699,6           707.1             +7.5

Payment to Hazardous Substance
  Response Trust Fund
  "Budget "Authority....;	         (26,600.0)     (40,000.0)      (44,000.0)       (+4,000.0)
   Obligations	         (26,600.0)     (40,000.0)      (44,000.0)       (+4,000.0)
   Outlays	         (26,600.0)     (40,000.0)      (44,000.0)       (+4,000.0)

TOTAL EHVIRONHENTAL PROTECTION
 AGENCY
   Budget Authority	      $3,676,012.0   $3,679,688.2    $3,658,591.0       -$21,097.2
   Obligations.....	       3,452,757.4    4,318,098.9     3,692,299.0       -625,799.9
   Outlays	       5,083,319.1    4,380,050.0     4,101,504.0       -278,546.0
   Permanent Workyears..	           9,632.4        9,125.0         8,669.1           -455.9
   Total Workyears	          11,441.7       10,925.0        10,447.8           -477.2

-------
                                              ENVIRONMENTAL PROTECTION AGENCY

                                                       1983 Resources
                                                By Media and Appropriation
                                                  (dollars in thousands)
Air..		.
Water Quality.	.	
Drinking Water.	
Hazardous Waste	
Pesticides	
Radi a t1 on.. -,	
Interdisciplinary.	
Toxic Substances.......
Energy	,	
Management and Support.
     Subtotal
Buildings and Facilities	
Reimburseme'nts	
Hazardous Substance Response
  Trust Fund....	
Payment to the Hazardous Substance
  Response Trust Fund.............
     Subtotal,
Construction Grants.

     Total.	

Salaries &
Permanent
Workyears
1,374.4
1,950.6
471.2
643.1
662.2
148.1
325.6
626.7
36.4
2,204.1
8,442.4
. . *
* * •
...

8,442.4
* * •
8,442.4

Expenses

Amount
$70,480.0
95,940.0
24,796.7
32,826.3
28,501.0
8,340.0
17,573.5
34,182.0
4,489.7
231,484.0
$548,613.2
• * •
...
...
• * *
$548,613.2
• * *
$548,613.2
Abatement,
Control 4
Compliance
Amount
$107,855.1
108,861.0
39,303.5
63,028.0
22,318.9
2,195.7
2,909.8
22,603.0
. * .
...
$369,075.0
• -*- *
...
...
* • •
$369,075.0
* * »
$369,075.0

Research 8
Development
Amount
$33,910.2
11,197.9
13,858.3
20,697.2
2,108.2
387.6
3,452.6
12,876.8
20,511.2
. . .
$119,000.0
• • *
...
. . .
...
$119,000.0
• • *
$119,000.0


Permanent
Workyears
1,374.4
1,950.6
471.2
643.1
662.2
148.1
325.6
626.7
36.4
2,204.1
8,442.4
i a »
58.8
623.8
• * *
9,125.0
• » *
9,125.0

Total

Amount
$212,245.3
215,998.9
77,958.5
116,551.5
52,928.1
10,923.3
23,935.9
69,661.8
25,000.9
231,484.0
$1,036,688.2
3,000.0
...
210,000.0
(40,000.0)
$1,249,688.2
2,430,000.0
$3,679,688.2

-------
                                              ENVIRONMENTAL PROTECTION AGENCY

                                                       1984 Resources
                                                By Media and Appropriation
                                                  (dollars 1n thousands)
Air... ...... .
Water Quality ....... .
Drinking Water.......
Hazardous Haste .....
Pesticides.,
Radiation ....... .
Interdisciplinary
Toxic Substances .......
Energy
Management and Support
     Subtotal
Dull dings and Facilities .......
Reimbursements ......... .. ..... .
Hazardous Substance Response
  Trust Fund.. ............ .....
Payment to the Hazardous
  Substance Response Trust Fund
     Subtotal.
Construction Grants

     Total...

Salaries
Permanent
Workyears
1,350.3
1,662.9
465.1
625.8
652.7
126.9
353.4
606.2
36.8
2,116.7
7,996.8
• » »
...
...
...
7,996.8
» . »
7,996.8

& Expenses

Amount
$71,028.1
83,728.8
24,554.5
35,038.6
31 ,435.2
7,742.4
18,244.1
32,900.5
3,694.1
232,022.7
$540,389.0
• i •
...
...
...
$540,389.0
« * *
$540,389.0
Abatement,
Control t
Compliance
Amount
$92,815.4
61,324.0
29,893.4
58,150.4
19,634.4
3,095.7
7,049.4
21,970.3
...
...
$293,933.0
• * •
...
...
* • •
$293,933.0
• * *
$293,933.0

Research S
Development
Amount
$27,148.1
6,316.5
11,908.0
16,923.7
1,673.0
16.7
16,042.1
11,804.9
19,836.0
• • .
$111,699.0
• • •
...
...
* * *
$111,669.0
. . .
$111,669.0


Total
Permanent
Workyears
1,350.3
1,662.9
465.1
625.8
652.7
126.9
353.4
606.2
36.8
2,116.7
7,996.8
* * »
53.0
619.3
* » *
8,669.1
» « *
8,669.1

Amount
$190,991.6
151,369.3
66,355.9
110,112.7
52,742.6
10,854.8
41,335.6
66,675.7
23,530.1
232,022.7
$945,991.0
2,600.0
...
310,000.0
(44,000.0)
$1,258,591.0
2,400,000.0
$3,658,591.0

-------
                                                ENVIRONMENTAL PROTECT ION AGENCY
                                                 Total  Funds Obligated, 1983

                                                   (dollars 1n thousands)
to
s>
i

Research and Development
Air 	 	 	 	 	
Water Quality. 	 	
Drinking Water 	 	
Hazardous Waste 	
Pesticides. .. 	 	 	 	
Radi a tion 	 	 	 	
Interdl sci pi Inary.. 	 	
Toxic Substances 	 > 	 	


Abatement, Control and Compliance

Ms ter Qual f ty .,.,,. 	 •.-, 	
Drink incj Water. 	 	 	

Pesticides........... 	 	
Radiation. 	 	 . 	 	
Noise.. 	 	 	 	
IntBrdlscipl Inary. ., 	 	
Toxic Substances. 	 	 . , 	 	

Salaries and Expenses

Water Qual I ty 	 	 	
Drinking Water.. 	 	
Hazardous 'Waste 	
Pes tl c 1 des 	 	 	
Radiation 	 	 	 	 	 	
Noise 	 	 	
Interdl scipl inary. ., 	 .,,,..
Toxtc Substances 	 	 	

Management and Support 	 	 	 	 	
Budget
Authority
$119,000.0
33,9iU,2
11 197.9
13,858.3
20,697.2
2 108.2
387.6
3 452.6
12,876.8
20 511.2

369,075.0
107,855,1
108 861.0
39,303.5
63 028.0
22,318.9
2 195.7

2 909.8
22 603.0

548,613.2
70,4to.O
95 940.0
24 796.7
32 826.3
28 501.0
8 340 0

17 573.5
34 182.0
4 439 7
231.484.0
Unobligated
Balance
Brought
Forward
+$13,646.8
+2,.J4/.4
+1- 389.2
+619.7
+757.0
+26.1
H50.6
+139.4
+2 050.6
+2 971.0
+3,195.8
+12,742.0
+l,66/,9
+3 369.1
+451.7
" +290.8
+74.0
+124.6
+7.9
+2 517.4
+510.1
+3 728.5












Unobligated
Balance
Carried
Forward
-$6,632.8
-B13.4
-427.2
-139.7
-200.0
-1-2.1
-73.6
-69.4
-670,6
-1,031.0
-3,195.8
-6,817.0
-544,9
-1 191.1
-69.7
-154.8
-38.0
-65 . 6
-7.9
-916.4
-100. 1
-3 728 5












Total
Obligations
$126,014.0
3!>,444.2
12,159,9
14,338.3
21,254.2
2,122.2
464.6
3,522.6
14,256.8
22 451.2

375,000.0
108, 9/8,1
111,039.0
39,685.5
63,164.0
22,354.9
2,254.7

4 510.8
23,013.0

548,613.2
70, 480. 0
95,940.0
24,796.7
32,826.3
28 501.0
8 340 0

17 573.5
34 182.0
4 489 7
231. 484. tt
                                                                                                                   • n GA
~
-------

Buildings and Facilities
Scientific Activities Overseas
Construction Grants
Operations, Research and Facilities
Hazardous Substance Response Trust Fund
Total 	 	 	 	
Budget
Authori ty
3,000.0
...
2,430,000.0

210,000.0
$3,679.688.2
Unobligated
Balance
Brought
Forward
+2,921.7
+3,399.9
+1,974,259.0
+1,432.7
+47,704.0*
+$2,056.106,1
Unobligated
Balance
Carried
Forward
-888.7
-2,699,9
-1,404,259.0

-17,228.0
-11 .438.525,4
Total
Obligations
5,033,0 -V-'t
700.0 s\*s.
3,000,000.0 syJ!^
1,432.7 /ut
240,476.0 QW\,-.
$4,297.268.9
*  This figure includes $3,358.0 for offsetting collections from non-Federal sources.

-------
in
t*
                                                          ENVIKONMENTAl  PROTECTION  AGENCY


                                                            Total  Funds  Obligated,  1984
                                                              (dollars  in  thousands)

Research and Development
Air. 	 	 	 	 	



Pesticides 	 	 	

Interdl sclpHnary 	 	 	
Toxic Substances 	 	


Abatement, Control and Compliance
Air 	 	 	 	 	 	
Wa ter Qual 1 ty . . 	 .'; 	
Drinking Water 	 	
Hazardous Waste.. .... ... ........
Pesticides 	 	 	 	

No1 se 	 	 	

Toxic Substances 	 	 	 »
Management and Support...... 	
Salaries and Expenses
Air......... 	 , 	 	
Wa ter Qual i ty . . . 	 	 	 	 	 	 	 	
•Drinking Water. .. 	 i 	 	
Ha2ardous Waste 	 	
Pesticides. 	 	 	 	 	

Noise 	 	 	 	
Interdi scipli nary. 	 	 	
Toxic Substances 	 	 	


Budget
Authority
$111,669.0
27,148.1
6 316.5
11 908.0
16 923.7
1,673.0
16.7
16 042.1
11,804.9
19,836.0

293,933.0
92,815.4
61 324.0
29,893.4
58 150.4
19,634.4
3 095.7

7,049.4
21 970.3

540,389.0
/I 02$. 1
83 728 8
24 554.5
35 038.6
31 435.2
7 742 4

18 244 1
32 900.5
3 694.1
232.022.7
Unobligated
Balance
Brought
Forward
+$6,632.8
+813.4
+427.2
+139.7
+200.0
+12.1
+73 .6
+69.4
+670.6
+1,031.0
+3,195.8
+6,817.0
+544.9
+1 191.1
+69.7
+154.8
+38.0
+65.6
+7.9
+916.4
+100.1
+3,728.5












Unobligated
Balance
Carried
Forward
-$5,867.8
-645.4
-322.2
-87.7
-140.0
-10.1
-65.6
-62.4
-519.6
-819.0
-3,195.8
-5,879.0
-366.9
-847 . 1
-9.7
-132.8
-32.0
-55.6
-7.9
-663.4
-35.1
-3,728.5












Total
Obligations
$112,434.0
2.1 , 316.1
6,421.5
11,960.0
16,983.7
1,675.0
24.7
16,049.1
11,955.9
20,048.0

294,871.0
92,993.4
61,668.0
29,953.4
58,172.4
19,640.4
3,105.7

7,302.4
22 035.3

540,389.0
/i,02ti.l
83 728.8
24,554.5
35,038.6
31,435.2
7 742.4

18,244.1
32 900.5
3 694.1
232.022.7

-------







in
I
CTl

Bulltilnqs and Facilities
Scientific Activities Overseas
Construction Grants
Operations, Research and Facilities
Hazardous Substance Response Trust Fund
Total...... 	 	 	 	
* This figure Includes $7,542.0 for offsetting
Budget
Authority
2,600.0
...
2,400,000.0

310,000.0
$3 658 591 0
collections from
Unobligated
Balance
Brought
Forward
+888.7
+2,699.9
+1,404,259.0

+24,770.0*
+$1 446 067 4
non-Federal sources.
Unobligated
Balance
Carried
Forward
-523.7
-1,749.9
-1,404,259.0

-14,900.0
-$1 433 179 4

Total
Obligations
2,965.0
950.0
2,400,000.0

319,870.0
$3 671 479 0


-------
                                      ENVIRONMENTAL PROTECTION AGENCY
                                      Summary Of State Grant Resources
                                           (dollars In thousands)
                                        ACTUAL
AIR
          105 ...................       $88,145,1

MATER QUALITY
  SECTION l66 ........... ........        51,338.3
  CLEAN LAKES ........... . ..... ..         8,992.1

PRINKING HATER
  PU&IIC WATEIl SYSTEMS
    PROGRAM GRANTS ........ ......        29,456.4
  UNDERGROUND INJECTION
    CONTROL PROGRAM .............         6,379.9
  SPECIAL STUDIES 8 DEMOS.......         1,822.5
            &OM  -
HAZARDOUS WAfag
  HAZARDOUS WASTE MANAGEMENT ____        42,344.8

PESTICIDES
  PESTICIDES ENF. GRANTS ..... ...         9,087.4
  PESTICIDES CERT. * TRAINING...         2,579.1

TOXIC SUBSTANCES
  TOXICS ENt. GRANTS. . . . ....... ,    _ 500^0

         SUBTOTAL ............. .. .      $240,645.6

CONSTRUCTION GRANTS .......... ...     2.116.802.7

         TOTAL ..... ..... .. ......    $2,357,448.3
CURRENT ESTIMATE
      1983
     1,734.9
    54,200.0
     3,000.0
    27,450.0

     7,074.5
     1,900.0-
    44,068.0
     8,702.9
     2,000.0
  $233,130.3

 2.430,000.0

$2,663,130.3
    ESTIMATE
      1984
   $69,954.7


    24,000.0





    21,204.0

     6,094.2



    42,500.0
     6,918.4
     2,100.0
  $172,771.3

 2,400.0j)0.0

$2,572,771.3
  INCREASE +
  DECREASE -
1984 vs.  1983
 -$14,780.2
  -30,200.0
   -3,000.0
   -6,246.0

     -980.3
   -1,900.0
   -1,568.0
   -1,784.5
     +100.0
 -$60,359.0

  -30,000.0

 -$90,359.0

-------
                                                        ENVIRONMENTAL  PROTECTION AGENCY

                                                    History Of  State Grant Budget Authority
                                                               Part  I:  1971-1977
                                                             (dollars  in  thousands)
>

Co
                                                     1971
          1972
1973
1974
1975
1976
1977
AIR
"Tection 105
Section 175
WATER QUALITY
Section 106
Section 208
Clean Lakes
DRINKING WATER
Public Water Systems
Underground Injection
Special Studies..* Demos
HAZARDOUS WASTE
Haz. Waste Management
. Solid Waste Management
Resource Recovery
PESTICIDES
PestTcT3es Enf. Grant
30,200
30,200
10,000
10,000
1 ,629
1,629
—
42,900
42300
15,000
15,000
2,545
2,545
—
50,000
SO, 000
70,000
20,000
50,000 _!/
3,250
3,250
—
50,000
50,000
150.000
50,000
100,000 I/
—
—
—
55,268
55,268
199,625
150^000 I/
4,000 ~
—
___
—
51,518
51,518
112,375
44,375
53,000
15,000
10,000
7300
2,500
1.800
1,800
—
55,550
55,550
80,000
50,000
15,000
15,000
20,000
15,000
5,000
2,925
2,925
1,000
I.O'OO
                       Pesticides Cert.  & Training

                     TOXIC SUBSTANCES
                       roxlcs  Enf. Grants
                             TOTAL
41,829   60,445   123.250     200,000     254,093     175,693   159,475
                     I/  CONTRACT AUTHORITY
                     *Pest1c1des certification and  training  data  for  these years  is unavailable.

-------
                                                           ENVIRONMENTAL PROTECTION AGENCY

                                                       History Of State Grant Budget Authority
                                                                  Part II:  1978-1984
                                                                (dollars in thousands)
                                                                                                             1983
>
t
AIR
  Section 105
  Section 175

WATER QUALITY
  Section 106
  Section 208
  Clean Lakes

DRINKING MATER
  Pun Me Water Systems
  Underground Injection
  Special Studies S Dems

HAZARDOUS WASTE
 - Haz. Waste Management
   Solid Waste Management
   Resource Recovery

PESTICIDES
   Pesticides Enf. Grant
   Pesticides Cert. S Training

 TOXIC SUBSTANCES
   Toxics Enf, Grants
1978
66,135
66,135
128,110
52,400
59,509
16,201
27,110
20,500
6,000
610
14,304
14,304
7,280
5,000
2,280
~
1979
130,025
80,025
50,000
108,003
	 51','IOD
41,028
14,575
36,270
26,400
7,600
2,270
44,886
15,018
15,150
14,718
13,052
9,538
3,514
"Err
1980
82,800
82,800
101,230
48,730
37,500
15,000
34,745
29,450
4,395
900
38,600
18,600
10,000
10,000
12,393
8,750
3,643
err
1981
87,673
95,696
$1,223
33,473
11,000
37,598
'29' ,'450
6,648
1,500
38,570
26,487
8,083
4,000
10,972
2)952
1,000
T7MF
1982
87,735
87,735
60,200
51,200
9,000
37,848
6*575
1,323
41,700
41,700
11,202
8.S32
2,570
500
500"
CURRENT
ESTIMATE
84,735
M.73S
57,200
54,200
3,000
36,424
2/,4i>0
7,074
1,900
44,068
44.06B
10,703
8,703
2,000
~
1984
ESTIMATE
69,955
69,955
24,000
24,000
27,298
21,204
6,094
42,500
42,500
9,018
2 ',100
"5zr
                                  TOTAL
                                     242,939   332,236   269,768    271,509   239,185   233.130
172.771

-------
                                                          ENVIRONMENTAL PROTECTION AGENCY

                                                     Positions By Grade and Average EmploymeTit

                                                               SALARIES AND EXPENSES
rvj
o
Grades

Executive Level II..
Executive Level III.
Executive Level IV..
Executive Level V...

        Subtotal	

ES-6	
ES-5	
ES-4	
ES-3	
ES-2..	.".
ES-1	

        Subtotal....

GS-16...	
GS/GM-15.....	
GS/GM-14		
GS/GM-13	
GS-12...	,
GS-11....		
GS-10	
GS-9....	
GS-8	
GS-7		
GS-6		
GS-5	
GS-4	
GS-3		
GS-2	
GS-1		

        Subtotal	
                                                                               Actual
                                                                                1982

                                                                                  1
                                                                                  1
                                                                                  7
                                                                                  1
10

 5
28
94
34
16
23
                                                                                200

                                                                                  9
                                                                                530
                                                                                ,014
                                                                                ,540
                                                                                ,776
                                                                                898
                                                                                 65
                                                                                534
                                                                                168
                                                                                591
                                                                                439
                                                                                509
                                                                                223
                                                                                 47
               Current
               Estimate
                 1983

                   1
                   1
                   7
                   1
10

 5
26
91
33
15
22
                 192

                   9
                 482
                 974
               1,479
               1,706
                 862
                  63
                 512
                 161
                 567
                 422
                 489
                 214
                  46
                   3
                Estimate
                   1984

                     1
                     1
                     7
                     1
   10

    5
   25
   86
   30
   14
   20
                 1
  180

    9
  457
  922
 ,399
1,615
  816
   59
  485
  152
  537
  399
  462
  202
   43
    3
                                                                              8,346
               7,989
                 7,560

-------
Grades

Positions established by act of
  July 1, 1974 (42 U.S.C. 207):
  Assistant Surgeon General, $36,072 to
    $50,160	
  Director grade, $26,736 to $46,188.	
  Senior grade, $21,304 to $37,680...	
  Full grade, $18,024 to $31,512	
  Senior assistant grade, $16,740 to $27,252...
  Assistant grade, $14,604 to $20,173	

        Subtotal	

Positions established by act of
  November 16, 1977 (42 U.S.C. 201) compensation
  for which is not to exceed the maximum rate
  payable for a GS-18	

Ungraded.. •-.	

   Total  permanent positions...,	
Actual
 1982
    78
   118
    42
     8
   246
    30
    65
Current
Estimate
  1983
      71
     108
      38
       7
     224
      27
      59
Estimate
  1984
      69
     104
      37
       7
     217
      26
      57
 8,897
   8,501
   8,050

-------
                                      ENVIRONMENTAL PROTECTION AGENCY

                                 Positions By Grade and Average Employment

                                 HAZARDOUS SUBSTANCES RESPONSE TRUST FUND
                                                                       Current
                                                      Actual           Estimate           Estimate
Grades                                                 L9S2            aijL983_             1J84

ES-5		           1                 1                  1
ES-4	.	           223
        Subtotal,
GS/GM-15..	          28                35                 35
GS/GM-14..		,	          42                53                 52
GS/GM-13	          90               122                121
GS-12....	         138               188                185
GS-11		,	          72                97                 96
GS-10..	',	
GS-9	          20                28                 28
GS-8	,	           566
GS-7	          16                21                 21
GS-6	,	,.	          11                15                 15
GS-5			          22                29                 29
GS-4			           8                11                 II
GS-3	
        Subtotal....			         452               605                599

Positions established by act of
  July 1, 1974 (42 U.S.C. 207):
   Director grade, 27,806 to $48,035	          235
   Senior grade, $22.241 to $39,193	          233
   Full grade, $18,745 to $32,774	          3                 4                  3
   Senior assistant grade, J17.420 to $28,343...          4                 5                  4
        Subtotal	         11                15                 15

        Ungraded	          1                 1                  1

        Total Permanent positions...	        467               624                619

-------
                                                   RESEARCrt AND DEVELOPMENT
                                                  Classification by Objects
                                               Includes Direct Obligations Only
                                                    (dollars in thousands)
                                                                   Actual
                                                                    1982
Current
Estimate
  1983
Estimate
  1984
23.2  Communications, utilities, and other rent.......	         $238.0      $405.0
25.0  Other services...	      109,419.6   $75,342.8    $69,236.7
26.0  Supplies and materials	           30.0        60.0
41.0  Grants, subsidies, and contributions..	       90.950.3    50.126.2     43,197.3

            Total obligations	     $200,637.9  $126,014.0   $112,434.0

EXPLANATION OF INCREASES AND DECREASES TO OBJECT CLASSIFICATIONS
                                                                             Budget       Current                Increase +
                                                                   Actual    Estimate     Estimate    Estimate   Decrease -
                                                                    1982     _._1_9»3___       1983        1984     1984 vs. 1933


Communications, utilities and other rent.	—         $230.0       ...         $485.0

    The increase in the current estimate reflects the                                      +$485.0
revised estimate for the allocations to the Food and Drug
Administration (FOA) for the National Center for Toxico-
Togical Research {NCTR).

    The decrease in the 1984 request reflects the elltnlna-                                                           -$485.0
tlon of our allocation to the Food and Drug Administration
(FOA) for the National Center for Toxlcological  Research
(NCTR).

-------
                                                                             Budget       Current                Increase  +
                                                                   Actual     Estimate      Estimate     Estimate    Decrease  -
                                                                   _L9_i
-------
                                                                             Budget       Current                Increase  +
                                                                   Actual     Estimate      Estimate     Estimate    Decrease  -
                                                                    1982       1963         1983         1984      1984 vs.  1983

Grants, Subsidies, and contributions	       $90,950.3    $59,393.0     $50,126.2    $43,197.3

    Changes to this object class include:                                                -$9,266.8

    Congressional add-on to the Great Lakes program	                                (+1,435.0)
    EPA's application of the $8.5 million Congressional
      add-on to this appropriation	                                (+4,875,0)
    Change in the rate of obligations in grants.	                               (-15,576.8)

    The decrease in the 1984 request reflects lower                                                                -$6,928.9
research grant levels in the Air, Water Quality and
Hazardous Waste programs.

-------
                                              ABATEMENT, CONTROL AND COMPLIANCE

                                                  Classification by Objects
                                              Includes Direct Obligations Only
                                                    (dollars In thousands)
                                                                 Actual
                                                                  1982
Current
Estimate
  1983
Estimate
  1984
Personnel Services...	,	         $145.7

Other Objects:

21.0 Travel and transportation of persons,.	          $46.7       ...         $195,0
22.0 Transportation of things.,...	            1.0
23.2 Communications, utilities, and otherrent..........             .2
24.0 Printing and reproduction. —	            2.5
25.0 Other services	,		      143,416.2  $135,559.0    120,516.2
26.0 Supplies and materials...*	            9.4
31.0 Equipment	..           21.0
41.0 Grants, subsidies, and contributions	      249,683.1   239,441.0    174,159.8
42.0 Insurance claims and Indemnities	     	2.2       ...      __u_i__

         Total other objects.......		     $393,182.3  $375.000.0   $294.871.0

         Total obligations....	     $393,328.0  $375,000.0   $294,871.0


EXPLANATION OF INCREASES AND DECREASES TO OBJECT CLASSIFICATIONS

                                                                           Budget       Current
                                                                 Actual    Estimate     Estimate    Estimate
                                                                  1982       19B3         1983        1984

Personnel services..	         $145.7

    There is no change In the 1983 estimate and no
request for 1984.
                                    Increase +
                                    Decrease -
                                    1984 vs. 1983

-------
Travel and transportation of persons.	.	

    There Is no change in the 1983 estimate.

    The Increase In the 1984 request reflects the
need for travel In the drinking water program for
direct implementation of the Underground Injection
Control and Public Water System Supervision programs
In States that do not have primacy.
Transportation of things.
    There is no change in the 1983 estimate and no
request for 1904.
Conniunlcations, utilities, and other rent.
    There is no change In the 1983 estimate and no
request for 1984.
Printing and reproduction.
    There is no change in the 1983 estimate and no
request for 1984.
Actual
 1982

 $46.7
  $1.0
   $.2
  $2.5
                                                                           Budget
                                                                           Estimate
                                                                             1983
Current
Estimate
  1983
Estimate
  1984

  $195.0
Increase +
Decrease -
1984 vs. 1983
                                                  +$195.0

-------
f
ro
CO
          Other services.
              The  increase  in  the  1983 current estimate  results
          from the following:
              Congressional add-on  to  Air  Grants  Programs...,.
              Congressional add-on  for Great  Lakes Program..,.
              Congressional add-on  for Chesapeake Bay  Program.
              Congressional add-on  for Corps  of Engineers  to
                purchase  additional workyears—		.
              Congressional add-on  for Academic Training......
              Change  In the rate  of obligations for contracts.
    The decrease In the 1984 request primarily results
from contract costs to Mater Quality programs for the
Corps of Engineers, Effluent Gull delInes and Chesapeake
Bay.  Other reductions occurred In Hazardous Haste
regulations and guidelines and Pesticides Generic
Chemical Review.
                                                                          Actual
                                                                           1982
                                                                           Budget
                                                                           Estimate
                                                                             1983
Current
Estimate
  1983
Estimate
  1984
Increase +
Decrease -
1984 vs. 1983
                                                             $143,416.2  $132,481.0   $135,559.0   $120,516.2

                                                                                      +$3,078.0
                                                                                        (+584,0)
                                                                                        i +500.0)
                                                                                        (+861.5)

                                                                                      (+2,800 .0)
                                                                                        (+340.0)
                                                                                      (-2,007.5)
                                                                                                                        -$15,042.8
          Supplies and materials.
                                                                   $9.4
             There  Is  no  change  In  the  1983 estimate and  no
          request  for 1984.
          Equ1pment.
              There  1s  no  change  in  the  1983 estimate  and  no
          request for 1984.
                                                                  $21.0

-------
                                                                           Actual
                                                                            1982
                                                                           Budget
                                                                           Estimate
                                                                             1983
Current
Estimate
  1983
Estimate
  1984
Increase +
Decrease -
1984 vs. 1983
1/1
>
Grants, subsidies, and contributions	      $249,683.1   $187,927.0   $239,441.0   $174,159.8

    Changes to this object class include:                                             +$51,514.0

    Congressional add-on for grant programs:
      Air	.	                              (+14,196.2)
      Water Qual 1 ty	                              (+13,354.4)
      Drinking Water (PNSS)....	.		                               (+3.890.0)
      Drinking Water (UIC)		                               (+1,534.3)
      Hazardous Waste	                               (+8,931.4)
      Pesticides Enforcement	    •                           (+1,784.5)
      Clean Lakes		                               (+3,000.0)
      Rural Water Association		,	                               (+1,900.0)
    Congressional add-on for wastewater treatment
     operator trai n-i ng		                               (+2,625.2)
    Congressional add-on for Great Lakes program to
     continue Section 108(a) demonstration  grants	                                 (+500.0)
    Congressional add-on for Chesapeake Bay Program	                                  (+38.5)
    Congressional add-on for Academic Training	                                 (+660.0)
    Change In,rate of obligations for grants	                                 (-900.5)

    The decrease in the 1984 request reflects lower                                                            -$65,281.2
State grants levels,


Insurance claims and indemnities	            $2.2

    There Is no change In the 1983 estimate and no
request for 1984.

-------
                                                       SALARIES AND EXPENSES

                                                     Classification by Objects
                                                  Includes Direct Obligations Only
                                                       (dollars in thousands)
Personnel  Services.

Other Objects:
21.0  Travel and transportation of persons	
22.0  Transportation of things	
23.1  Standard level user charges...	
23.2  Communications, utilities, and other rent.
24.0  Printing and reproduction	
25.0  Other services	.	
26.0  Supplies and materials...	
31.0  Equipment	
32.0  Lands and structures...	
41.0  Grants, subsidies, and contributions	
42.0  Insurance claims and indemnities	
           Total other objects.	

           Total obligations	

Position Data:

           Average salary, GS positions.
           Average grade, GS positions..
                                                                 Actual
                                                                  1982
              Current
              Estimate
                1983
             Estimate
               1984
$359,094.1  $345,671.9  $350,260.9
$12,070.8
1,453.7
21,746.0
40,054.4
3,946.3
63,989.3
11,601.5
25,121.9
37.3
1,642.0
15.9
$14,276.1
2,021.6
20,892.0
55,715.7
7,041.9
78,369.9
12,802.8
11,321.3
• * •
500.0
• '• •
$14,307.1
2,110.9
27,488.0
44,967.7
6,366.0
71,141.6
11,914.8
11,332.0
• • •
500.0
• • *
$181,679.1  $202.941.3  $190.128.1

$540,773.2  $548,613.2  $540,389.0
 $30,788
   10.85
EXPLANATION OF INCREASES AND DECREASES TO OBJECT CLASSIFICATIONS
                                                                 Actual
                                                                  1982
$32,019
  10.85
              Budget
              Estimate
                1983
$32,019
  10.85
             Current
             Estimate
               1983
             Estimate
               1984
Increase +
Decrease -
1984 vs. 1983
Personnel services.
     The Increase In the 1983 current estimate results
from the following:
$359,094.1  $331,621.1  $345,671.9  $350,260.9

                        +$14,050.8

-------
                                                                 Actual
                                                                  1982
             Budget
             Estimate
               1983
     EPA's application of the $10,5 million  Congressional
       add-on which supports the increase of workyears
       and the effluent guidelines and radionuclides
       programs	
     Congressional  add-on for AWT reviews..	
     Congressional  add-on in Great Lakes program for
       Grosse lie laboratory		
     EPA's employer share of the Medicare tax (1.3%)	
     Adjustment to reflect revised salary estimates.....

     The increase in the 1984 request reflects primarily
the cost of fringe benefits for the Public Health Service
Commissioned Corps Officers which were previously funded
by the Public Health Service.
Current
Estimate
  1983
                        (+10,399.3)
                           (+350.0)

                           (+400.0)
                         (+2,760.1)
                           (+141.4)
Estimate
  1984
Increase +
Decrease -
1984 vs. 1983
                                                   +$4,589.0
Travel  and transportation of persons.	.	

     There is no change in the 1983 current estimate.

     The increase in the 1984 request  reflects the
amount required to cover increased costs already
realized with Increases to conraercial  air fares.
$12,070.8   $14,276.1     $14,276.1    $14,307.1
                                                     +$31.0
Transportation of things.	

     Changes to this object class include:

     EPA's application of Congressional  reduction to
       management and support offices	
     Congressional add-on in Great Lakes program for
      •Grosse He laboratory	
     Adjustments to cost estimates using 1982 actual
       costs as a base	
 $1,453.7    $1,884.7
$2,021.6

 +$13_6.9_


    (-.1)

   (+6.0)

 (+131,0)
 $2,110.9
     The increase In the 1984 request again reflects
estimates based on 1982 actual  costs and expected increases
for the shipping of materials.
                                                     +$89.3

-------
                                                                 Actual
                                                                  1982
             Budget
             Estimate
               1983
Standard level user charges.
$21,746.0   $25,428.0
 Current
 Estimate
   1983

$20,892.0

-$4,536.0
 Estimate
   1984

$27,488.0
Increase +•
Decrease -
1984 vs. 1983
    The decrease in the 1983 current estimate reflects
the reduction 1n rent needs caused by Congressional
direction to GSA to charge SLUG for 1983 at 1982 rates.

    The Increase In the 1984 estimate reflects the Increase
In SLUG rates from 1982 to 1984, partially offset by
decreased space needs.

Communications, utnities, and other rent	    $40,054.4   $44,508.6     $55,715.7    $44,967.7

    Changes to this object class Include:                                             +$J.l,2p7;l

    EPA's application of the $10.5 million Congressional
      add-on to fund the effluent guidelines program	                   ,             (+50.7)
    EPA's application of Congressional reduction to
      management and support offices	                               (-650.3)
    Congressional add-on in Great Lakes program for
      Grosse He laboratory...	                               (+100.0)
    Increase in 1903 estimate reflects the transfer of
      ADP Sup'port Cost funds from Other Services to this
      object class for operational support for the
      National Computer Center (NCC)	».                             (+4,981.1)
    Increase to Nationwide and Headquarters Support Costs
      reflects adjustment In rental costs for equipment and
      telephones, and the continually rising costs of
      utill ties	                             (+6,725.6)

    The decrease In the 1984 request reflects a $2.0
ml11 ton reduction for operational support for the National
Computer Center (NCC) and the remaining reduction
realized through cost savings in rental costs for
equipment and telephones In Nationwide, Headquarters and
Regional Support.
                                                  +$6.596^0
                                                 -$10,748.0

-------
                                                                           Budget       Current                Increase  +
                                                                 Actual     Estimate      Estimate     Estimate    Decrease  -
                                                                  1982        1983         1983         1984      1984  vs.  1983

Printing and reproduction	      $3,946.3     $7,872.1      $7,041.9     $6,366.0

    The decrease in the 1983 current estimate results from  •                             -$830.2
the following:

    EPA's application of the $10.5 million Congressional
      add-on to fund the effluent guidelines program	                                 (+50.0)
    EPA's application of Congressional  reduction to
      management and support offices	                                 (-90.6)
    Reduction reflects adjustments to 1983 estimate based
      on 1982 actual costs for printing and reproduction..                                (-789.6)

    The decrease in the 1984 request primarily reflects                                                           -$675.9
reductions In printing needs In Air, Water Quality and
Toxic Substances.

Other services.	,	>     $63,989.3    $87,130.3     $78,369.9    $71,141.6

    The decrease in the 1983 current estimate results from                             -$8,760.4
results from the following:

    EPA's application of Congressional^reduction to
      management and support offices	                                (-474.3)
    Congressional add-on to Great Lakes program for
      Grosse lie laboratory.	                                (+404.0)
    Reduction In 1983 estimate reflect the transfer of ADP
      Support Cost  funds from this object class to communi-
      cations, utilities, and other rent and equipment for
      operational support for the National Computer
      Center (NCC)	.'...-	                              (-6,232.9)
    Reduction reflects adjustments to the 1983 estimate
      based on 1982 actual costs for administrative and
      maintenance service contracts.	                              (-2,457.2)

    The decrease In the 1984 requests reflects a major                                                           -$7 ,228.3
reduction 1n Air, Water Quality, Energy, Management and
Support, and Toxic  Substances programs with small reductions
In Drinking Water and Hazardous Waste.

-------
                                                                           Budget       Current,                Increase +
                                                                 Actual     Estimate     Estimate    Estimate   Decrease -
                                                                             1983         1983         9       1984 vs . 1983
Suppl j es and materi al s ............................. .....      $11.601.5   $13,139.6    $12,802.8   $11.914.8

    Changes to this object clasps Include:                                                -$336.8

    EPA's application of Congressional reduction
      to management and support offices ............ .....                                  (-62.4)
    Congressional add-on to Great Lakes program for
      Grosse lie laboratory .................. . ..... .....                                  (+40.0)
    Reduction reflects an adjustment based on 1982
      actual costs for supplies ......... ....... .........                                 (-314.4)

    The decrease In the 1984 request primarily reflects                                                            -$888.0
a reduction to' the Research and Development Mater Quality
and Hazardous Waste program needs, and smaller reductions
to Toxic Substances and Energy program needs.

Equipment ........................... ..... .......... _____ ..     $25,121.9   $10,839.7    $11,321.3   $11,332.0
— -*"~ — ^~ — : — i                     ~"~
    Changes to this object class Include:                                                +$481.6

    EPA's application of Congressional reduction to
      management and support offices .......... . ..........                                 (-72.4)
    Congressional add-on to Great Lakes program for                                       (+50.0)
      Grosse He laboratory......... ............... . .....
    Increase reflects transfer of ADP Support Cost funds
      from Other Services to this object class for
      operational support for the national Computer
      Center (NCC).. ....................... ..............                .              (+1,251,8)
    Reduction reflect adjustments to estimate based on
      lower projected needs for equipment ......... .. .....                                (-747.8)

    The small increase In the 1984 request reflects                                                                 +$10.J
additional equipment needs In this object class in 1984..

-------
                                                                 Budget    Current              Increase +
                                                         Actual   Estimate  Estimate  Estimate   Decrease -
                                                          1982     1983      1983      1984     1984 vs.1983


Lands and structures	          $37*3

     There Is no change In the 1983 estimate
and no request for 1984,

Grants, subsidies^jwd jcpjvtrlbutlons^............       $1,6,42.0     $4.0      $500.0    $500.0

    The Increase In the 1983 estimate primarily                             +$496.0
reflects an Increase in grants for construction
grant audits in the Office of Inspector General.

    There is no change in the estimate for 1984.

-------
                                                  BUILDINGS AND FACILITIES

                                                 Classification by Objects
                                              Includes Direct Obligations Only
                                                  (dollars in thousands)

21.0
25,0
31.0
32.0

Travel and transportation of persons 	 ,..
Other ser v! ces . . . . . 	 . . 	 ., 	

Lands and structures 	 	 	 	 	
Actual
1902
	 $15.7
....... 3 239.5
... 	 3.6
	 125.9
Current
Estimate
1983
$40.0
4 802.0
5.0
186.0
Estimate
1984
$40.0
2 812.0
3.0
1 10.0
          Total Obligations	.		   $3,384.7    $5,033.0     $2,965.0
EXPLANATION OF INCREASES AND DECREASES TO OBJECT CLASSIFICATIONS
Travel and transportation of persons.
    There Is no change in the 1983 current
estimate and 1984 estimate.
Other services.
    The increase in the 1983 current estimate reflects
a revised carryover estimate based on completion of a
laboratory facilities study In 1983 and transfer of
funds into this object class from lands and structures.

    The decrease in the 1984 estimate reflects lower
facility nerds 1n 1984.
  Actual
   1982

   $15.7
$3,239.5
 Budget
Estimate
  1983

   $40.0
                                                                                       Current
                                                                                       Estimate
                                                                                         1983
$40.0
Estimate
  1984

   $40.0
                   Increase +
                   Decrease -
                   1984 vs. 1983
  $864.0    $4,802.0    $2,812.0

           +$3,938.0
                                                -$1,990.0

-------
Equipment.
    The Increase 1n the 1983 current estimate reflects
a revised estimate for equipment needs.

    The decrease In the 1984 estimate reflects a
reduced need for equipment In 1984.
Lands and structures.
    The decrease 1-n the 1983 current estimate reflects
a revised carryover estimate based on completion of a
laboratory facilities study in 1983 and a transfer of
funds from this object class into other services.

    The decrease in the 1984 estimate reflects lower
facility needs In 1984.
           Budget
Actual    Estimate
 1982       1983

  $3.6
Current
Estimate
  1983

    $5.0

   +$5.0
Estimate
  1984

    $3.0
                                                                                                             Increase +
                                                                                                             Decrease -
                                                                                                             1984  vs. 1983
$125.9    $2,960.0      $186.0

                     -$2.774.0
             $110.0
                                                  -$2.0
                                                 -$76.0

-------
                                               SCIENTIFIC ACTIVITIES OVERSEAS
                                                  Classification by Objects
                                              Includes Direct Obligations Only
                                                  (In thousands of dollars)
                                                                 Actual
                                                                  1982
Current
Estimate
  1983
21.0  Travel and transportation of persons	                $19.3       $20.0
25.0  Other services	               __^i    _  680-°

                         Total Obligations	                $19.3      $700.0


EXPLANATION OF^INCREASESAND DECREASES TO OBJECT CLASSIFICATIONS

                                                                            Budget
                                                                 Actual    Estimate
                                                                  1982       1983
                                                                 	•	

Travel and transportation of persons.........	                $19.3       $20.0

    There Is no change in the 1983 current
estimate.

    The Increase Is the 1984 request reflects
additional activities expected In 1984.


Other services		                 ...       $680.0

    'There Is no change 1-n the 1983 current
estimate.

    The Increase In the 1984 request reflects
additional actlvltes expected In 1984.
Estimate
  1984

   $35.0
   915.0

  $950.0
            Current
            Estimate
              1983

               $20.0
           Estimate
             1984

              $35.0
Increase +
Decrease -
1984 vs. 1983
                                       +$15.0
              $680.0
             $915.0
                                      +$235.0

-------
                                HAZARDOUS SUBSTANCE RESPONSE TRUST FUND

                                       Classification by Objects
                                    Includes Direct Obligations Only
                                        (in thousands of dollars)
                                                                                        Current
                                                                  Actual    Estimate    Estimate
                                                                   1982       1983        1984
Personnel Services	»	      $17,851.9   $31,479.0   $35,039.2

Other Objects:

21.0  Travel and transportation of persons	       $1,472.5    $2,722.3    $2,786.0
22.0  Transportation of things......	           48.6       182.1       220.8
23.1  Standard level user chargers	        1,195.0     1,427.0     1,992.0
23.2  Communications, utilities, and other rent	        1,632.7     3,671.0     2,953.0
24.0  Printing and reproduction.	          126.0       288.0       286.0
25.0  Other services	,		      120,757,7   139,845.6   172,914.0
26.0  Supplies and materials........		          800.1     1,057.0     1,115.0
31.0  Equipment		.....        1,958.5     6,769.0     2,122.0
41.0  Grants, subsidies, and contributions...	       34.900.6    53.035.0   100,442.0

            Total other objects	-.-	     $162,891.7  $208,997.0  $284.830.8

Total obligations	                 $180,743.6  $240,476.0  $319,870.0

Position Data:

Average salary, GS positions..		          $30,900     $32,136     $32,136
Average grade, GS postlons		            11.38       11.38       11.38

-------
           EXPLANATION  OF  INCREASES  AND  DECREASES  TO  OBJECT  CLASSIFICATIONS

                                                                                      Budget      Current                Increase +
                                                                            Actual     Estimate    Estimate    Estimate    Decrease -
                                                                             1982       1983        1983       1984      1984 vs. 1983

           Personnel  services	     $17,851.9    $26,962.5   $31,479.0  $35,039.2

               The  Increase  in  the 1983  current estimate  results  from                            +$4,516.5
           the  following:

               EPA's  employer share  of the Medicare tax (1.3*)	            •                  (+216.5)
               Primarily an  Increase to  cover  the  additional  work/ears
                 a"dded  to  the Superfund  program.	                            (+4,300 .0 )

               The  Increase  In  the 1984  request primarily reflects                                                        +$3,560 .2
           a slower rate of  obligation of the  allocation  account  to
           the  Health and  Human Services In  the Interagency  Support
           program.
£
j..          Travel and transportation of  persons...	      $1,472.5     $2,722.3    $2,722.3    $2,786.0
Q
               There  Is no change In the 1983  current estimate.

               The  Increase  In  the 1984  request reflects  the                                                                +$63.7
           amount required to cover  Increased  costs already  realized
           with Increases  to commercial  air  fares.

           Transportation  of things		         $48.6      $262.3      $182.1     $220.8

               The  decrease  In  the 1983  current estimate  results  from                               -$80.2
           an adjustment to  cost estimates using 1982  actual  costs as
           a base.

               The  Increase  In  the 1984  request reflects  an  Increased                                                        +$38.7
           need for the shipping of  materials.

           Standard level  user  changes..	      $1,195.0     $1,453.0    $1.427.0    $1,992.0

               The  decrease  In  the 1983  current estimate  reflects the                               -$26.0
           reduction  In rent needs caused by the Congressional direc-
           tion to  GSA  to  charge SLUC for 1983 at  1982 rates,  partially
           offset by  an Increase In  the  portion of total  SLUC costs
           allocable  to Superfund.

-------
     The Increase In the 1984 request results from
Increased SLUG rates In 1984 and an Increase In the
portion of total SLUC costs allocable to Superfund.
Communications, utilities, and other rent.
     The Increase In the 1983 current estimate reflects
the revised estimate of this object class due to the
additional  work/ears and the rising costs of utilities.

     The decrease in the 1984 request reflects a lower
need for these costs in 1984.
Prl ntl ng and reproduction.
                                                                 Actual
                                                                  1982
  $126.0
     The decrease In the 1983 current estimate reflects
adjustments based on 1982 actual costs from printing.

     The decrease In the 1984 request reflects lower
printing and reproduction needs In 1984.

Other services	    $120,757.7

     The decrease In the 1983 current estimate results 1n
the following:

     Congressional action reduced Superfund by $20 million,
       but stipulated that an additional $4.7 million be
       set aside for Department of Health and Human Services
       and $10.0 million reprogramroed to support State site
       surveys under RCRA Section 3012.	
     Increase for adjusted carryover estimates....	
            Budget
            Estimate
              1983
$1,632.7    $2,200.9
$522.8
          Current
          Estimate
            1983
          $3,671.0

         +$1,470.1
 $288.0

-$234.8
          Estimate
             1984
          $2,953.0
$286.0
          $158,866.0  $139,845.6 $172,914.0

                      -$J.9,020(4
                      (-30,000.0)
                      (+10,979.6)
         Increase +
         Decrease -
         1984 vs., 1983

             +$565,0
                                                  -$718.0
                                                    -$2.0

-------
3=


ro
     The Increase In the 1984 request reflects a higher
level  of site  response action planned and the contract
funds to support such actions.
                                                                                     Budget      Current               Increase +
                                                                           Actual    Estimate    Estimate   Estimate   Decrease -
                                                                           _!?§?_      1983_      1983	     1984     1984	vs.	1983

                                                                                                                        +$33,068.4
Suppl 1 es and materials	,	          $800.1       $949.5     $1,057.0    $1,115.0

     The Increase In the 1983  current estimate reflects                                 +$107.5
adjustments to cost estimates  for supplies based on 1982
actual experience.

     The Increase In the 1984  request reflects an                                                                 +$58.p
Increased supply and material  needs for the various
allocation accounts.

Equipment	        $1,958.5     $2,304.9     $6,769.0    $2,122.0

     The Increase In the 1903  current estimate reflects                               +$4,464.1
the Increased need for laboratory equipment in this
object class.

     The decrease In the 1984  request reflects lower                                                           -$4,647.0
equipment needs for 1984.

Grants .sub si dies, and contributions.	      $34,900.6    $33,755.8    $53,035.0  $100,442.0

     The Increase in the 1983  current estimate results                               +$19.279.2
in the following:

     Congressional action directed that EPA fund
       $10 million to support  State site surveys under
       RCRA Section 3012		                             ( + 10,000.0)
     Increase for adjusted carryover estimates	                              (+9,279.2)
     The Increase In the 1984 request reflects a higher
level of site response action planned and the grant
funds to support such actions.
                                                                                                                        +$47,407.0

-------
Page Intentionally Blank

-------
Page Intentionally Blank

-------