&ER&
    United States
    Environmental Protection
    Agency
  Introducing...
  John O'Grady permanently
  replaced Tom Short in March
  as EPA's remedial project man-
  ager. John, who has been with
  EPA for 16 years, has worked
  on Superfund sites for the past
  nine years. Prior to joining
  the Superfund program, John
  worked in other EPA programs
  including water quality permit-
  ting and pesticides.  John can
  be reached at (312) 886-1477
  or(800) 621-8431x61477
  ogrady.j ohnj @epa. gov

  For more information...
  Susan Pastor
  Community Involvement
  Coordinator
  (312) 353-1325 or (800) 621-8431
  x31325
  pastor.susan@epa.gov
  Richard Nagle
  Assistant Regional Counsel
  (312) 353-8222 or (800) 621-8431
  x38222
  nagle.richard@epa.gov
  Site-related documents may be
  reviewed at:
  Mead Public Library
  7ION.  8th St.
  Sheboygan
  Sheboygan City Hall
  828 Center Ave.
  Sheboygan
  Certain EPA information can be
  viewed electronically at:
  http://www.epa.gov/region5/sites
 EPA Signs Agreement
for  Upper  River Cleanup
                                  Sheboygan River and Harbor Site
                                  Sheboygan County, Wisconsin
                                                May 2003
An agreement, called a consent decree, was recently signed by
U.S. Environmental Protection Agency, U.S. Department of Justice and
Tecumseh Products Co.  The agreement, which had been under nego-
tiation for the past year, commits the company to clean up the upper
portion of the Sheboygan River. It requires Tecumseh to clean up con-
taminated sediment, flood plain soil, and ground water at the Tecumseh
facility. This work will be done in phases starting with investigations
and source control at the facility and then proceeding on to evaluation
of the in-stream sediment and flood plain soil and eventually cleanup of
that sediment and soil.
Since this agreement only includes cleanup of the upper river, another
agreement to clean up the middle river, lower river, and inner harbor will
be done separately. If the lower portions of the river were to be cleaned
up first, there is a chance that they could become recontaminated during
cleanup of the upper river.
Once the consent decree is lodged in federal court, DOJ will begin a
30-day comment period by posting an announcement in the Federal
Register (www.epa.gov.region5/fedrgster). The decree will also be post-
ed on EPA's Web site (www.epa.gov/region5/sites). Public comments
may be directed to the Assistant Attorney General, Environment and
Natural Resources Division, P.O. Box 7611, Washington, D.C.  20044-
7611. Refer to United States v. Tecumseh Products Co. (E.D. Wis.),
Reference Number 03-C-0401.
After DOJ responds to the comments, it will ask that a judge enter the
consent decree in federal court to finalize the agreement. Information-
gathering activities, design of the cleanup components, and some sam-
pling could proceed this year with actual cleanup beginning in 2004.

Upper river cleanup timeframe
Before cleanup can begin, Tecumseh will design the project.
This includes:
• submitting a work plan to EPA-Fall 2003
• selecting contractors-Fall 2003
• starting pre design work-Winter 2003
• submitting a final design document to EPA-Winter 2004
• beginning cleanup-Summer 2004

-------
&EPA
     United States
     Environmental Protection
     Agency

     Region 5
     Office of Public Affairs (P-19J)
     77 W. Jackson Blvd.
     Chicago, IL 60604
                                                                             FIRST CLASS
                                     RETURN SERVICE REQUESTED
            SHEBOYGAN RIVER AND  HARBOR SITE:
                    Upper River Cleanup Agreement
                               This fact sheet is printed on paper made of recycled fibers.
-UJ90UOO gpBiu dm suoispsp iijgu sin os ABpoj SJB Agin
9J9UM pirejsjspun o; lUBjjodun si 11 pire guii; JSAO 9Aoui
    S93d 'SQiprus JSAU iSBd ui psisjdraoo ussq
  9ABi{ S5[SB} 9S9in jo Airera ji SB urass ABUI 11 n§
                           •dniresp J9AU jsddn
        uoipjduioo J9;jB sj^sA OM; joj AjjEnuumuras
        UOISOJ9 JGJ susiu urejd poo]j psu^sp psdsuj
       .KALI jsddn sqi jo uoi;9jduioo jsy^ sj^sA SAIJ
                   S9jdui^s ;u9iuip9s yos P91P3
                •(JS.I1J S9UIOO J9A9l{OIl{M) SJB9A Q£
               oijpgds o; 9SB9J09p suoi;^4U90uoo
                 3JB SQuosiApB uoi;duinsuoo
                  m suoi;^4U90uoo g3
                               Buuojmow
 jo
        jo
 93d
            Suisn jios
       'S93dj°
            o;
                       Smureiuoo jios jo
                   urejd poo]j 9ip ui jios g
                         |BAOUI9J |JOS U|B|d pOO|J
                             •J9AU 9ij; o;
                         pssn ;BSJ; pire
                                                o;
                                                jjijpirej
                                                                          ire jo
                                                              ire ;B iiisuiipss psSpsjp jo ssodsiQ
                                                                                  'SS9J§Ojd
                                                                   o;
                                                                •siisodsp lusuiipss ijos m
                                                   jo iimoure pire suou^jiugouoo
                                                                     o; JSAIJ
                                                                         |BAOUI9J JU91UIP9S
             SJB9A 9Aij joj iirejd sjrej u
     sip ;B Ajrenuireiiuss JS;BM punojg sip JOIIUOJAJ
          •J9AU 9i{; oiui sABMi{;Bd g3
-------