Rocky Mountain Arsenal
ust ten miles outside of Denver, Colorado, lies an area contaminated
by hazardous materials from years of chemical agent and pesticide
production. The 27-square-mile Rocky Mountain Arsenal (RMA)
Superfund site, located northeast of Denver, is now in the process of
being cleaned up and transformed into one of the largest urban national
wildlife refuges in the country. Through collaboration with potentially
responsible parties, other governmental agencies, and concerned citizens,
EPA is helping to restore the 17,000-acre former weapons manufacturing
facility to native prairie land to be used for public recreational activities
and wildlife habitat.
The Rocky Mountain Arsenal Site
During World War II, the U.S. Army purchased 17,000 acres in
Commerce City, Colorado, to manufacture and assemble weapons to
support the country's efforts for WWII. After the war, the Army leased
a portion of the Arsenal to private industry to offset operational costs. In
1946, Julius Hyman and Company began producing pesticides at the site
until 1952, when it was acquired by Shell Chemical Company. From
1952 until 1982, Shell Chemical Company (now Shell Oil Company)
manufactured pesticides and herbicides at the site. On its portion of
land, the Army produced chemical agents until 1957 and continued
weapons operations until 1969.
The Army and private chemical manufacturers disposed of liquid wastes
in numerous unlined waste-disposal basins and trenches, resulting in
groundwater, surface water, and soil contamination. By the mid-1950s,
nearby residents discovered that the contamination was causing crop
damage and affecting groundwater supplies. Soil contaminated with
aldrin, dieldrin, dibromochloropropane (DBCP), and arsenic posed the
most serious threat to public health.
The Cleanup
Both the Army and Shell Oil Company have been engaged in cleanup
activities at the site since 1982. Thus far, more than $1.3 billion has been
spent by the responsible parties in the cleanup effort. In 1987, the site
was officially added to EPA's National Priorities List (NPL) of
hazardous waste sites needing cleanup. The cleanup plan, developed
with EPA oversight, used an "outside-in" approach. In other words, to
protect surrounding communities from the contamination, cleanup
activities were prioritized in the outer areas closest to neighborhoods.
continued
Cleanup crews remediate soil contaminated
with aldrin, dieldrin,
dibromochloropropane and arsenic from
years of destructive disposal practices.
JUST THE FACTS:
• Responsible parties have spent
more than $1.3 billion on cleanup
efforts so far.
• Installed water treatment systems
decontaminate 2.4 million gallons of
groundwater per day. More than 2
million cubic yards of soil have been
cleaned up, and over 9,000 tons of
steel from demolished structures
have been recycled.
• The wildlife refuge will provide safe
habitat to hundreds of waterfowl,
deer, black-tailed prairie dogs, and
bald eagles.
• The 940-acre Western Tier Parcel
was deleted from the National
Priorities List on January 21, 2003.
The community has seen a
renewal of development in the
areas surrounding the Arsenal.
Since the cleanup began, 43,000
new households have either been
planned or constructed
immediately north of the site.
These are the first housing
developments planned by
Commerce City in 40 years.
Cleanup work has also created
jobs in the area.
-------
Over the years, hundreds of public meetings have been held to strengthen community involvement
in the decision-making process related to the cleanup and reuse plans.
During the initial stages of the cleanup, the U.S. Fish and Wildlife Service
(USFWS) discovered that the site was inhabited by close to 300 wildlife
species, including an abundance of deer, eagles, prairie dogs, hawks,
coyotes, and owls. In recognition, Congress passed the RMA
National Wildlife Refuge Act in 1992, which provides for the Arsenal
to become a National Wildlife Refuge. It is anticipated that the
17,000-acre site will be fully cleaned up by 2011.
CONTACTS:
Catherine Roberts, Community
Involvement Coordinator (8OC)
U.S. EPA Region 8
999 18th St, Suite 300
Denver, CO 80202-2466
Ph: (303) 312-6025
Roberts.Catherine@epamail.epa.gov
Progress Made
To date, work has been completed on the 940-acre Western Tier
Parcel (WTP) portion of the RMA site, allowing the Agency to delete
the area from the National Priorities List. Several proposals being
considered for reuse of the WTP include commercial, recreational,
ballfields, and open space options, as well as a community center and a
Visitor Center for the refuge. Additional portions of the site are expected to
be removed from the NPL in 2003, further establishing the wildlife refuge.
Overall, the RMA cleanup has included the treatment and removal of equipment and
structures on the site, the incineration of approximately 10.5 million gallons of liquid waste, and the
clean up of more than 2 million cubic yards of contaminated soil. Groundwater treatment systems
have been constructed and currently treat 2.4 million gallons of water a day, and more than 9,000
tons of steel have been recycled from demolished structures. These cleanup activities use methods
that will not only allow the wildlife refuge to thrive, but will also assure the protection of the many
human visitors who will come to enjoy the area.
Benefits to the Community and Wildlife
The community has also seen a renewal of development in the areas surrounding the
Arsenal. Since the cleanup began, 43,000 new households have either been planned or
constructed immediately north of the site. These are the first housing developments
planned by Commerce City in 40 years. Cleanup work has also created jobs in the
area. Depending on the season, between 570 and 820 people involved in the cleanup
are employed at the RMA site.
Restoring the refuge's prairie ecosystem is a major cleanup goal. Prairie
ecosystems are highly endangered and have been destroyed faster than any other
ecosystem in the country. The wildlife refuge will provide protected habitat for an
estimated 3,600 black-tailed prairie dogs, more than 850 deer, hundreds of
migrating waterfowl, and more than 50 bald eagles (the bald eagle is currently
listed as a threatened species).
The successes of the Rocky Mountain Arsenal Superfund Site will continue as the
wildlife refuge grows in size and scope. EPA is working tirelessly to rehabilitate
this contaminated land that was environmentally scarred after years of
destructive disposal practices. Through collaboration with the surrounding
community, the responsible parties, local government, and the USFWS, EPA is
ensuring that the cleanup of the site will result in a safe and healthy prairie
ecosystem to be enjoyed by generations to come.
The RMA National Wildlife Refuge
will provide protected habitat
for hundreds of mule deer, as well as
black-tailed prairie dogs, migrating
waterfowl, and eagles.
------- |