Office of Solid Waste and                              EPA 540-R-10-014
Emergency Response                                   February 2010
(5102G)                                    www.clu-in.org/optimization
          Remediation System Evaluation (RSE)

             Millcreek Dump Superfund Site
       Millcreek Township, Erie County, Pennsylvania

-------
         REMEDIATION SYSTEM EVALUATION
         MlLLCREEK DUMP SUPERFUND SITE
MlLLCREEK TOWNSHIP, ERIE COUNTY, PENNSYLVANIA
           Report of the Remediation System Evaluation
      Site Visit Conducted at the Millcreek Dump Superfund Site
                    September 2, 2009
                     Revised Report
                   February 16, 2010

-------
                                        NOTICE
Work described herein was performed by GeoTrans, Inc. (GeoTrans) for the U.S. Environmental
Protection Agency (U.S. E.P.A). Work conducted by GeoTrans, including preparation of this report, was
performed under Work Assignment #48 of EPA contract EP-W-07-078 with Tetra Tech EM, Inc.,
Chicago, Illinois. Mention of trade names or commercial products does not constitute endorsement or
recommendation for use.

-------
                                       PREFACE
This report was prepared as part of a project conducted by the United States Environmental Protection
Agency Office of Superfund Remediation and Technology Innovation (U.S. EPA OSRTI) in support of
the "Action Plan for Ground Water Remedy Optimization" (OSWER 9283.1-25, August 25, 2004).  The
objective of this project is to conduct Remediation System  Evaluations (RSEs) at selected pump and treat
(P&T) systems that are jointly funded by EPA and the associated State agency. The project contacts are
as follows:
          Organization
    Key Contact
         Contact Information
U.S. EPA Office of Superfund
Remediation and Technology
Innovation
(OSRTI)
Jennifer Hovis
USEPA Headquarters - Potomac Yard
2777 Crystal Drive
Arlington, VA 22202
phone: 703-603-8888
hovis.jennifer@epa.gov
Tetra Tech EM, Inc.
(Contractor to EPA)
Elizabeth Powell
Tetra Tech EM Inc.
1881 Campus Commons Drive, Suite 200
Reston,VA20191
phone: 703-390-0616
Elizabeth.Powell@ttemi.com
GeoTrans, Inc.
(Contractor to Tetra Tech EM, Inc.)
Doug Sutton
GeoTrans, Inc.
2 Paragon Way
Freehold, NJ 07728
phone: 732-409-0344
dsutton@ geotransinc. com

-------
                         TABLE OF CONTENTS
NOTICE	i
PREFACE	ii
TABLE OF CONTENTS	iii
1.0  INTRODUCTION	1
    1.1 PURPOSE	1
    1.2 TEAM COMPOSITION	2
    1.3 DOCUMENTS REVIEWED	2
    1.4 PERSONS CONTACTED	2
    1.5 BASIC SITE INFORMATION AND SCOPE OF REVIEW	3
       1.5.1    LOCATION	3
       1.5.2    SITE HISTORY, POTENTIAL SOURCES, AND RSE SCOPE	4
       1.5.3    HYDROGEOLOGIC SETTING	6
       1.5.4    POTENTIAL RECEPTORS	8
       1.5.5    DESCRIPTION OF GROUND WATER PLUME	9
2.0  SYSTEM DESCRIPTION	10
    2.1 EXTRACTION SYSTEM	10
    2.2 TREATMENT SYSTEM	11
    2.3 MONITORING PROGRAM	11
3.0  SYSTEM OBJECTIVES, PERFORMANCE, AND CLOSURE CRITERIA	14
    3.1 CURRENT SYSTEM OBJECTIVES AND CLOSURE CRITERIA	14
    3.2 TREATMENT PLANT OPERATION STANDARDS	15
4.0  FINDINGS	16
    4.1 GENERAL FINDINGS	16
    4.2 SUB SURFACE PERFORMANCE AND RESPONSE	16
       4.2.1    PLUME CAPTURE	16
       4.2.2    GROUND WATER CONTAMINANT CONCENTRATIONS	20
    4.3 COMPONENT PERFORMANCE	23
       4.3.1    EXTRACTION SYSTEM	23
       4.3.2    METALS REMOVAL SYSTEM	23
       4.3.3    AIR STRIPPER	23
       4.3.4    SOLIDS HANDLING	23
       4.3.5    SYSTEM CONTROLS	24
       4.3.1    PH ADJUSTMENT	24
    4.4 COMPONENTS OR PROCESSES THAT ACCOUNT FOR MAJORITY OF ANNUAL COSTS	24
       4.4.1    UTILITIES	25
       4.4.2    NON-UTILITY CONSUMABLES AND DISPOSAL COSTS	25
       4.4.3    LABOR	25
                                  in

-------
       4.4.4   CHEMICAL ANALYSIS	25
   4.5 APPROXIMATE ENVIRONMENTAL FOOTPRINTS ASSOCIATED WITH REMEDY	26
       4.5.1   ENERGY, AIR EMISSIONS, AND GREENHOUSE GASES	26
       4.5.2   WATER RESOURCES	26
       4.5.3   LAND AND ECOSYSTEMS	26
       4.5.4   MATERIALS USAGE AND WASTE DISPOSAL	26
   4.6 RECURRING PROBLEMS OR ISSUES	27
   4.7 REGULATORY COMPLIANCE	27
   4.8 SAFETY RECORD	27
5.0  EFFECTIVENESS OF THE SYSTEM TO PROTECT HUMAN HEALTH AND THE
    ENVIRONMENT	28
   5.1 GROUND WATER	28
   5.2 SURF ACE WATER	28
   5.3 AIR 	28
   5.4 SOIL	29
   5.5 WETLANDS AND SEDIMENTS	29
6.0  RECOMMENDATIONS	30
   6.1 RECOMMENDATIONS TO IMPROVE EFFECTIVENESS	30
       6.1.1   FURTHER CHARACTERIZE EXTENT OF CONTAMINATION	30
       6.1.2   INSTALL ADDITIONAL POINTS FOR WATER LEVEL MEASUREMENTS	31
       6.1.3   CONDUCT A SHUTDOWN AND RESTART TEST OF THE EXTRACTION SYSTEM .... 32
       6.1.4   DOCUMENT THE FINDINGS FROM THE ABOVE EVENTS, USE FINDINGS FOR
              CAPTURE ZONE ANALYSIS	34
       6.1.5   AUTOMATE CHEMICAL FEEDS OR PROVIDE APPROPRIATE INTERLOCKS TO
              DISCONTINUE CHEMICAL FEEDS IF ONE OR MORE EXTRACTION TRENCHES
              DISCONTINUE OPERATION	35
       6.1.6   IF OFF- SITE SHALLOW CONTAMINATION is IDENTIFIED AND DETERMINED TO BE
              RELATED TO THE SITE, CONDUCT A VAPOR INTRUSION EVALUATION	35
   6.2 RECOMMENDATIONS TO REDUCE COSTS	36
       6.2.1   DISCONTINUE APRIL SAMPLING EVENT	36
       6.2.2   DISCONTINUE ANALYSIS FOR DISSOLVED METALS	36
       6.2.3   STREAMLINE PROCESS SAMPLING	36
       6.2.4   REVISIT DATA AND REPORTING COSTS	37
       6.2.5   REDUCE OR ELIMINATE LIME CONDITIONING OF SLUDGE	38
   6.3 RECOMMENDATIONS FOR TECHNICAL IMPROVEMENT	38
       6.3.1   CLEANUP UP TREATMENT PLANT	38
       6.3.2   CONSIDERATIONS REGARDING TREATMENT PLANT MODIFICATIONS, IF
              NECESSARY	38
   6.4 CONSIDERATIONS FOR GAINING SITE CLOSE Our	39
       6.4.1   DETERMINING A PATH FORWARD	39
   6.5 RECOMMENDATIONS FOR IMPROVED SUSTAINABILITY	40
       6.5.1   REVISED APPROACH TO METALS REMOVAL	40
       6.5.2   CONSIDERATIONS FOR RENEWABLE ENERGY AT THE SITE	40
                                  IV

-------
Tables

Table 4.1
Table 6.1
Table 6.2
Energy and Atmosphere Footprint Analysis
Cost Summary Table
Sustainability Summary Table
Figure 1.      Alternate Ground Water Flow Paths
Figure 2.      Proposed Direct-Push Locations
Attachments

Attachment A - Selected Figures from Previous Site Reports
                                           v

-------
                             1.0    INTRODUCTION
1.1     PURPOSE

During fiscal years 2000 and 2001 independent reviews called Remediation System Evaluations
(RSEs) were conducted at 20 operating Fund-lead pump and treat (P&T) sites (i.e., those sites
with P&T systems funded and managed by Superfund and the States). Due to the opportunities
for system optimization that arose from those RSEs, EPA OSRTI has incorporated RSEs into a
larger post-construction complete strategy for Fund-lead remedies as documented in OSWER
Directive No. 9283.1-25, Action Plan for Ground Water Remedy Optimization. A strong interest
in sustainability has also developed in the private sector and within Federal, State, and Municipal
governments. Consistent with this interest, OSRTI has developed a Green Remediation Primer
(http://cluin.org/greenremediation/) and now as a pilot effort considers green remediation during
independent evaluations.

The RSE process involves a team of expert hydrogeologists and engineers that are independent of
the site, conducting a third-party evaluation of the operating remedy. It is a broad evaluation that
considers the goals of the remedy, site  conceptual model, available site data, performance
considerations, protectiveness, cost-effectiveness, closure strategy, and sustainability. The
evaluation includes reviewing site documents, potentially visiting the site for one day, and
compiling a report that includes recommendations in the following categories:

    •   Protectiveness
    •   Cost-effectiveness
    •   Technical improvement
    •   Site closure
    •   Sustainability

The recommendations are intended to help the site team identify opportunities for improvements.
In many cases, further analysis of a recommendation, beyond that provided in this report, may be
needed prior to implementation of the recommendation.  Note that the recommendations are
based on an independent evaluation, and represent the opinions of the evaluation team. These
recommendations do not constitute requirements for future action, but rather are provided for
consideration by the Region and other  site stakeholders.

Millcreek Dump Superfund Site was selected by EPA OSRTI based on a nomination from EPA
Region 3 due to the potential need for improvements before the state accepts full financial
responsibility for the site. The site is located in Erie, Pennsylvania. The P&T system was
operated by the potentially responsible parties (PRP) during LTRA. The Commonwealth of
Pennsylvania has taken  over the full operation and maintenance activities for the Site in
accordance with the State Superfund Contract.  EPA Region 3 and PADEP agreed that an
evaluation should be conducted to determine if there were any optimization opportunities for this
system.  In addition, EPA Region 3 conducted a Five Year Review for the Site in 2006 and
identified  certain issues relating to plume capture and the remedy's effectiveness. As a result, the
Region proposed optimization of the system to EPA Headquarters.

-------
1.2    TEAM COMPOSITION
The RSE team consists of the following individuals:
Name
Doug Sutton
Peter Rich
Christopher Baer
Affiliation
GeoTrans, Inc.
GeoTrans, Inc.
GeoTrans, Inc.
Phone
732-409-0344
410-990-4607
610-337-7660
Email
dsutton@geotransinc.com
prich@geotransinc.com
chris.baer@geotransinc.com
In addition, the following individuals from EPA Headquarters participated in the RSE
site visit.

    •   Jennifer Hovis
    •   Jennifer Edwards

1.3    DOCUMENTS REVIEWED
The following documents were reviewed.  The reader is directed to these documents for
additional site information that is not provided in this report.
    •   EPA Superfund Record of Decision - May 1986
    •   EPA Superfund Explanation of Significant Differences - April 1997
    •   EPA Superfund Explanation of Significant Differences - May 1999
    •   EPA Five-Year Review Report - September 1996, September 2001, September 2006
    •   2008 Annual Ground Water Monitoring Report, URS
    •   Draft Remedial Process Optimization Report, URS
    •   Millcreek Quarterly Progress Reports, 4th Quarter 2008, 1st Quarter 2009, 2nd Quarter
       2009, URS
    •   Change order 3 for site operations, URS
    •   Millcreek Capture Zone Analysis, HGL
    •   Millcreek Vapor Intrusion Technical Memorandum, HGL
    •   Discharge Monitoring Reports, January through April 2009
    •   Millcreek Treatment Plant O&M Manual, USAGE 2007
1.4    PERSONS CONTACTED
The following individuals associated with the site were present for the visit:

-------
Name
Rom Roman
Linda Dietz
William McKenty
John Epps
John Morettini
Chris Saber
Gary Mechtly
Kammy Halterman
Misty Kauffman
David Back
Bill Bogdanski
Affiliation
U.S. EPA Region 3
(RPM)
U.S. EPA Region 3
U.S. EPA Region 3
U.S. EPA Region 3
PADEP
PADEP
PADEP
PADEP
HydroGeoLogic, Inc.
HydroGeoLogic, Inc.
URS
Phone
215-814-3212
215-814-3195
215-814-3331
215-814-3144



814-332-6191



Email
Roman.Romuald(@,epa.gov
Dietz.Linda@epa. gov
McKentv . William(@,epa. gov
Epps . John(g),epa. gov



khalterman@state .pa.us



PADEP = "Pennsylvania Department of Environmental Protection'
1.5     BASIC SITE INFORMATION AND SCOPE OF REVIEW
 1.5.1
LOCATION
The Millcreek Dump Site is located at 3081 W. 17th street, Millcreek Township, Erie County,
Erie, Pennsylvania. The Millcreek Dump site is 124 acres which includes 84 acres of a former
freshwater wetland that was used as a dump for foundry sands, solvents, waste oils, and other
industrial and municipal wastes and 40 acres of land where the potentially responsible parties
(PRP) constructed a flood retention basin and wetlands. Figure 3 of the 2008 Annual Ground
Water Monitoring Report prepared by URS for PADEP, which is provided in Attachment A of
this report, is an aerial photograph of the area and indicates the site location along with other
notable features in the area. The Millcreek Dump Site is accessed by W.  17th Street along the
eastern property edge. The ground water treatment area of the property includes the Millcreek
Treatment building, paved parking area located on the western side of the treatment building, and
a retention pond located northwest of the treatment building. The Millcreek Golf and Learning
Center is located on the site.  The Millcreek Golf and Learning center consists of a 9-hole golf
course, driving range, a clubhouse which includes a pro shop, restrooms,  a classroom and snack
bar, a maintenance building and associated parking areas.  A stream, Marshall Run, is located
adjacent to and east of the site. Marshall Run discharges to Lake Erie 1.2 miles  northwest of the
site.  Industrial and residential properties surround the Site towards the east and north. The Erie
International Airport (EIA) is located adjacent to and west of the site. A CSX railroad is  located
adjacent to and south of the Site.

-------
 1.5.2          SITE HISTORY, POTENTIAL SOURCES, AND RSE SCOPE

According to the September 2006 Five-Year Review, the site was operated as an unpermitted
landfill for foundry sand and municipal and industrial waste from 1941 to 1981.  Operations
between 1977 and 1979 included disposal of non-halogenated solvents, ink waste, 900 drums of
polyester resins, 19,800 gallons of caustics, 3,000 drums of paint waste, and 6,480 drums of slag
at the site. Bulk waste oils were also reportedly disposed of at the site. A metals reclamation
facility was operated in the eastern portion of the site.  The metals reclamation facility included a
deep pond to supply water for foundry sand washing.

PADEP discovered the dumping of drums in the central portion of the site in April of 1981. The
drums were sampled and found to contain trichloroethene (TCE).  PADEP closed the site in 1981.
In August 1982, the Erie County Health Department (ECHO) discovered drums on the surface of
the site while investigating a gas well fire. The Environmental Protection Agency (EPA)
dispatched its Environmental Response Team (ERT) to the site to conduct drum, soil, sediment,
ground water, and surface water sampling to determine the potential health risks. Initial removal
actions started in 1983 and included securing the site with fences and gates across access roads,
demolishing sheds onsite, crushing 600 clean drums and sending them to a metal recycling
facility, removing 75 drums of hazardous liquids, and storing 364 drums filled with non-
hazardous materials in the northeastern corner of the site.  EPA completed a Remedial
Investigation/Feasibility Study (RI/FS) in August 1985. Warning signs were posted at the site by
EPA in 1986. The following is a summary of the contamination identified on the site during the
RI/FS and ERT investigations.
Soil
    •  Elevated levels of Polychlorinated Biphenyls (PCBs) were detected in the eastern and
       south central portions of the site.  The maximum concentration of PCBs identified was 31
       mg/kg wet weight.

    •  Elevated levels of Polycyclic Aromatic Hydrocarbons (PAHs) were detected throughout
       the site, especially the southwestern portion.  The maximum concentration of PAHs
       identified was 539 mg/kg wet weight.

    •  Elevated levels of phthalates were detected throughout the site. Most of the phthalate
       contamination was found in the southern portion of the site. The maximum concentration
       of phthalates was 72 mg/kg wet weight.

    •  Elevated levels of volatile organic chemicals (VOCs) were detected in the south central
       portion of the site. The maximum concentration of VOCs identified was 6 mg/kg.
       Elevated levels of VOCs are also believed to be located in the eastern portion of the site
       based upon ground water monitoring well data.

    •  Two metals of concern, copper and lead, were detected throughout the site.  The
       maximum concentration of copper and lead were 20,500 and 2,375 mg/kg wet weight,
       respectively.
Sediment
       Except for VOCs, which were not detected, many of the same compounds detected in soil
       were detected in sediment in the wetland in the southern portion of the site, in ditches
       within and along the perimeter of the site, and in Marshall Run.

       The maximum PCBs concentration identified was 1.50 mg/kg wet weight.

-------
    •  The maximum Phthalate concentration identified was 5.0 mg/kg wet weight

    •  The maximum Phenols concentration identified was 0.99 mg/kg wet weight

    •  The maximum metals concentration of copper and lead identified was 6.61 and 0.67
       mg/kg wet weight respectively.

Ground Water

    •  Except for metals manganese and iron, elevated levels of ground water contamination
       were restricted to the eastern portion of the site.

    •  The maximum concentration of total VOCs identified was approximately 30,000 ug/L.
       The following list shows the most frequently detected VOCs and their maximum
       concentrations.
Contaminant of Concern
1,1-Dichloroethane (DCA)
1 , 1 -Dichloroethene (DCE)
1,2-DCE
TCE
1,1,1-Trichloroethane (TCA)
Vinyl chloride (VC)
Maximum Concentration (ug/L)
260
16
29,000
300
960
220
    •  Phthalates were detected in ground water on site. Diethyl phthalate was identified at
       concentration up to 41 (ig/L, and di-n-butyl phthalate was identified at concentrations up
       to 21 (ig/L.

    •  The maximum concentrations of iron and manganese identified on site were 20,800 and
       1,920 (ig/L respectively.
Surface water
       The maximum concentration of VC and 1,1,1-TCA identified in surface water were 18
       and 93 (ig/L, respectively.

       Metals were detected in the wetland area in the southern portion of the site and in
       Marshall Run. The following tables show the list of metals detected and the maximum
       concentration identified.
Contaminant of Concern
Copper
Iron
Manganese
Lead
Zinc
Aluminum
Mercury
Nickel
Tin
Cadmium
Concentration (ug/L)
9,560
21,600
1,580
1,940
6,270
6,270
0.81
386
385
3.7

-------
A Record of Decision (ROD) was signed on May 7, 1986 specifying the following remedial
action remedy components:

    •  Excavation of soil and sediments with elevated contaminant levels and consolidation of
       these  materials on-site under a Resource Conservation and Recovery Act (RCRA)
       compliant cap

    •  Consolidation of any drums found containing solid Non-RCRA waste under the RCRA
       cap

    •  Dispose of any drums containing a liquid or RCRA hazardous waste off-site

    •  Placement of soil cover over remaining areas with low level contamination

    •  Grade and revegetate soil cover and cap

    •  Construction of flood retention basins (FRBs)

    •  Treatment of contaminated ground water by pumping and treating (P&T)

    •  Installation of additional monitoring wells


To manage the technical aspects of the site, EPA divided the  site into two Operable Units (OUs).
OU-1 includes the contaminated ground water to be remediated using P&T. OU-2 includes the
source material on-site to be remediated by installing a cap and surface water management basins.
Two ESDs, one in 1997 and one in 1999, have modified the remedy for OU-2.  The final OU-2
remedy was deemed construction complete in 2001. It did not include any excavation of
contaminated soils and included use of a 12-inch soil cover with a warning mesh rather than
installation of a RCRA cap.

This RSE focuses on OU-1 and addresses OU-2 only as it may affect the evaluation of OU-1.

 1.5.3         HYDROGEOLOGIC SETTING

The Draft Remedial Process Optimization report prepared by URS in April 2009 provides the
most recent description of the site geology and hydrogeology. The following description is based
on the information provided in that report.

The regional geology in the area of the site consists mainly of unconsolidated deposits of glacial
till overlying shale. Successive glacial advances and retreats formed till deposits that occur
throughout the region. Following the final glacial retreat, waters in the Erie basin ponded in front
of the glaciers to  form a succession of pro-glacial lakes at elevations higher than present-day
Lake Erie. Glaciolacustrine deposits between the beach ridges and overlying the till deposits are
predominantly fine sand and silt deposited in low energy, off-shore lake environments, with
thicknesses ranging from less than 50 feet to more than 200 feet.

The bedrock geology of the area includes a thick succession of stratified Upper Devonian
sedimentary rocks, forming the northern flank of the Allegheny Basin. Bedrock that subcrops
beneath the glacial deposits of the region consists of shales, siltstones, and thinly-bedded
sandstones of the Conneaut Group, and underlying shales, with thin layers of interbedded
sandstone, of the  Canadaway Formation. On-site boring logs  indicate subsurface materials consist
of blue/gray sandy/silt with varying amounts of clay. Shale bedrock is encountered at
approximately 50 feet below grade in the area of the Site.

-------
Monitoring wells at the site have been classified as shallow (Zone B) and deep (Zone A) wells.
The well intervals appear to be based arbitrarily on depth rather than on specific, distinct
formations. There is no continuous aquitard between the Zone A and Zone B wells and there is
not necessarily a consistent difference in the geology between the Zone A and Zone B wells. The
Zone B wells are approximately 15 to 20 feet deep and the Zone A wells are approximately 25 to
30 feet deep with the exception of MW-23A, MW-25A, MW-28A, and MW-33A, which are 10
to 30 feet deeper than the rest of the Zone A wells. Despite the relative lack of distinction
between Zone B and Zone A wells (e.g., generally similar depths and no reported aquitards that
separate them), water quality parameters clearly indicate a different water quality. In the October
2008 event, the temperature was typically 2°C lower in the Zone A wells than the Zone B wells
and the ORP was typically substantially lower in the Zone A wells than the Zone  B wells, likely
indicating that the Zone B wells are substantially affected by recharge.

Regional flow direction of ground water is predominantly to the north toward Lake Erie, with
local variances due to the influences of topography, land use,  and drainage.  The depth to water is
approximately 4 feet to 5 feet below ground surface  (bgs). Average horizontal hydraulic
gradients were calculated to be approximately 0.0025 feet per foot.  Due to the essentially
unlimited amounts of water provided by Lake Erie to surrounding townships, including Millcreek
Township, ground water is not extensively utilized.

Vertical hydraulic gradients vary between upward and downward for some wells but are
relatively consistent in the upward or downward directions for others.  The following table
summarizes the vertical gradient direction for locations where the gradient is relatively consistent
in one direction (i.e., in one direction more than two  times as often as the other direction).
Well Cluster/Location
MW-25
MW-33
MW-37
MW-38
MW-40
MW-41
MW-42
MW-46
MW-47
Vertical Gradient Direction
Upward
Downward
Downward
Upward
Downward
Downward
Downward
Downward
Downward
      Notes:
            MW-23, MW-43, andMW-44 tend to be downward during the first 5years
            but more recently appear to be upward. It is unclear if this is due to
            changes in operation of Trench #2, which is the most productive recovery
            trench at the site.

            The tables that summarize the vertical gradients in the Draft RPO report
            incorrectly summarize the vertical gradient directions. The description is
            reversed from the actual condition (i.e., the gradient is described as
            upward when the actual gradient is downward and the gradient is
            described as downward when the actual gradient is upward). The above
            table correctly summarizes the gradient direction.

-------
It is evident from the above table that the gradient is typically downward at most of these well
locations, with the exception of MW-25 and MW-38, and it is noted that the magnitudes of
vertical gradients at these two locations are relatively slight compared to those at many of the
other wells. It is also evident that the well locations that have consistent downward gradients are
typically not near the recovery trenches with the exception of MW-41 and MW-42. It is noted,
however that these two wells are near Trench #3, which has a very low recovery rate. This
overall finding suggests that the general pattern of vertical flow at the site may be downward but
that vertical flow in the vicinity of the recovery trenches is variable, perhaps resulting from an
upward influence from pumping that sometimes (but not always) overcomes the background
downward gradient. An upward gradient in the vicinity of a recovery trench would suggest that
the trench is drawing some water up from a deeper aquifer interval.

Representative hydraulic conductivities for the site based on a pumping test were not available for
review, and the modeling review presented in the Draft RPO report did not indicate any of the
aquifer properties that were used in the calibrated model. The model generally indicates that flow
from the site will discharge to Marshall Run approximately 2,500 feet to the north/northwest, on
the west  side of the cemetery. The model output is discussed in further detail in Section 4.0 of
this report.

 1.5.4         POTENTIAL RECEPTORS

According to the 1986 ROD, the public health and environmental objectives of the remedy
include the following.

    •  Prevent onsite air dispersal of particles containing potentially hazardous substances

    •  Prevent direct dermal contact with potentially hazardous substances

    •  Prevent offsite transport of contaminated soil and sediment via erosion or storm water
        transport

    •  Remediate offsite ground water contamination to ground water protection goals

    •  Remediate soil contamination to safe soil levels capable of preventing future ground
        water contamination

    •  Remediate sediment contamination capable of causing an impact on aquatic life or
        wildlife  in the wetlands and Marshall Run

    •  Remediate potential surface water contamination by remediating ground water, soil, and
        sediment contamination

Currently, contaminated ground water poses a potential risk due to the potential for direct contact
by construction workers  and for vapor intrusion in surrounding businesses and homes.  Future use
of ground water is unlikely; however, institutional controls preventing such use are being
evaluated by Region 3 and, if necessary, will be documented in a future decision document.  All
water in the area is reportedly provided by the public water supply  system that draws water from
Lake Erie.  The site team indicated that a back-up water supply well is located along  26th Street
approximately 1  mile up-gradient from the site. The well is reportedly a dug well that is shallow
(10 feet to 12 feet deep).

-------
 1.5.5         DESCRIPTION OF GROUND WATER PLUME

The predominant contaminants of concern that remain in ground water are 1,1-dichloroethane
(1,1-DCA), cis-l,2-dichloroethene (cis-l,2-DCE), and vinyl chloride (VC).  Figures 7 and 8 of
the 2008 Annual Ground Water Monitoring Report (see Attachment A) present the distribution of
total VOCs (which is basically the sum of concentrations of these three contaminants). The
highest concentrations are in the northern corner of the site. The wells with the highest
concentrations are MW-42A (over 5,000 ug/L total VOCs), MW-23B (over 1,500 ug/L total
VOCs),  and MW-40A (over 1,000 ug/L total VOCs). Based on the values observed at MW-42A
and MW-40A, it appears that concentrations increase with depth. The concentrations for the
same constituents at MW-23A are three orders of magnitude lower or non-detect, but it should be
noted that MW-23A is another 20 feet deeper than MW-40A and MW-42A. The elevated
concentrations at MW-42A and  MW-40A are not vertically delineated at those locations.

The horizontal extent of contamination in Zone B as depicted in Figure 8 of the 2008 Annual
Ground  Water Monitoring Report indicates VOC contamination at well MW-31 and does not
connect that contamination with other contamination from the site.  Based on the pre-pumping
conditions presented in the model, MW-31 is not downgradient from the site; however, there was
little data available at the time to determine the ground water flow directions in the vicinity of
MW-31. As discussed in Section 4.0 of this report, it is debatable if the contamination currently
detected at MW-31 results from this site.

The horizontal extent of contamination as depicted in Figure 7 of the 2008 Annual Ground Water
Monitoring Report is influenced by the relative lack of data to the east and west for Zone B and to
the north for Zone A. There are no water level measurements or water quality sampling locations
for Zone A between the  northern boundary of the site and MW-25A, which is approximately
1,000 feet downgradient. As a result, the direction of ground water flow, the extent of
contaminant transport, and the trend in concentrations downgradient of the site in Zone A cannot
be determined.

-------
                           2.0    SYSTEM DESCRIPTION
According to the 2006 Five-Year Review, construction of the OU-1 treatment plant was completed in
June 1990 and the ground water extraction system was completed in December 1990. The United States
Army Corps of Engineers (USAGE) operated and maintained (O&M) OU-1 from February 1992 through
September 30, 1997.  The identified potentially responsible parties (PRPs) took over O&M of the plant
and ground water extraction system, OU-1, on October 1, 1997 for a period often (10) years, ending in
2007.
2.1     EXTRACTION SYSTEM

The ground water extraction system consists of five (5) trenches arranged in an "L" shape along portions
of the northern and eastern site boundaries. According to the 2006 Five-Year Review, four (4) of the
trenches have a flow rate as designed, however Trench #3 developed a lower flow rate over time. EPA
added an additional extraction well to Trench #3 to increase the ground water capture in that trench, but
overall extraction from Trench #3 is still less than the design rate.

Each of the five collection trenches consists of a 6-inch slotted well pipe that is wrapped in a
polypropylene fabric sleeve. The well pipe is positioned horizontally in a trench approximately 25-30 feet
deep and 200 feet long. The trench is backfilled with coarse sand. The trench allows contaminated ground
water to flow by gravity into the 4-foot diameter collection sumps where the ground water may then be
pumped to the treatment plant for treatment. Each collection trench is furnished with a Trench
Monitoring Piezometer (TMP), which is a 2-inch piezometer located in the center section of the backfill
of each collection trench that is not connected to the trench piping. Each of the trenches is outfitted with
two pumps that alternate operation and are reportedly capable of producing 50 gpm each.  The operator
estimates the following production rates for the trenches.
Trench
Trench # 1
Trench #2
Trench #3
Trench #4
Trench #5
Total
Estimated Production Rate (gpd)
19,000 to 22,000
55,000 to 65,000
1,800 to 2,000*
25,000
25,000
-130,000 gpd or 90 gpm
        * This is the flow rate when conditions are wet. The rate is lower when conditions are dry.

The treatment plant operator indicated that the flow rates from the extraction trenches are manually
controlled and that extraction rates from individual trenches are varied daily to maintain an overall system
flow of approximately 90 gpm.  For example, the extraction rate in Trench #1 may be decreased for a day
to allow the water level in the trench to recover, but during this time, the extraction rate in Trench #5 may
be increased to compensate for the reduced flow from Trench #1.  The daily flow rates and water levels
are recorded in the quarterly reports.
                                          10

-------
2.2     TREATMENT SYSTEM

According to the Operation and Maintenance (O&M) Manual, ground water extracted from the site is
treated in the site treatment plant via the process mode B described in the O&M Manual.

Influent ground water is pumped into the Inclined Plate Clarifier (IPC) wet well, where potassium
permanganate is added to oxidize iron, manganese and phenols. An anionic polymer is also added to the
influent in the IPC wet well to flocculate the metals. Beginning in 2000 the PRPs added additional piping
to the system that allowed the effluent from the plant to be used for mixing chemicals and dilution
purposes.  The chemically treated influent is then pumped to the IPC where the solids are precipitated out
of the process water. The IPC effluent drains by gravity to an equalization tank, where it is pumped
through the packed tower air stripper for VOC  removal.  The effluent from the treatment plant gravity
drains into Marshall Run. From May to September the treatment plant effluent is pumped to a holding
pond where it is used to irrigate the golf course. The use of the effluent as irrigation water for the golf
course was approved by EPA in 2000.
2.3     MONITORING PROGRAM
Ground Water Monitoring

Ground water monitoring is conducted in April and October. The following table lists the wells included
in the monitoring plan and during which events the wells are sampled.
Well
MW-11
MW-12
MW-29
MW-31
MW-32
MW-35
MW-23A
MW-23B
MW-25A
MW-25B
MW-28A
MW-28B
MW-33A
MW-33B
MW-37A
MW-37B
MW-38A
MW-38B
MW-39A
MW-39B
MW-40A
MW-40B
MW-41A
MW-41B
April
X
X
X
X
X
X
X
X
X
X
X
X
X
X










October
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
                                         11

-------
MW-42A
MW-42B
MW-43A
MW-43B
MW-44A
MW-44B
MW-45A
MW-45B
MW-46A
MW-46B
MW-47A
MW-47B












X
X
X
X
X
X
X
X
X
X
X
X
       Samples from all wells are analyzed in the field for temperature, dissolved oxygen, ORP, and
       conductivity. Samples from all wells in the April event are analyzed in a laboratory for VOCs,
       SVOCs, total and dissolved metals, and general chemistry.  Samples from all wells in the October
       event are analyzed in a laboratory for VOCs, total and dissolved metals, and general chemistry.
Process Monitoring

Process monitoring is conducted daily, weekly, and monthly.  The sample locations include IPC influent
(1-B), IPC effluent (2-B), and air stripper effluent (3-B). These sample locations are referred to as
process monitoring sample locations in the following text.

Daily process monitoring samples are  collected as grab samples five (5) days a week, Monday through
Friday. The daily process monitoring  includes collection of samples from the process monitoring
sampling locations.  The samples are analyzed for temperature, pH, turbidity, conductivity, total dissolved
solids, and total suspended solids in the onsite laboratory

Weekly process monitoring samples are collected as grab samples one (1) day per week, preferably on
Monday, from the process monitoring  sample locations. The samples are analyzed for total organic
carbon, total iron, dissolved iron, total manganese, and dissolved manganese. Weekly process monitoring
sample analysis is conducted in the onsite laboratory.

Monthly Permit Compliance sampling is conducted during the first week of the month.  Samples are
collected from process monitoring sample locations 1-B and 3-B.  The monthly samples are collected as
an eight hour composite, with the exception of the VOC sample which is collected as a grab sample. The
composite samples are collected by  collecting 1/8 of the sample volume needed every hour for eight
hours. The samples are analyzed for VOCs using method SW 846 8260 B, metals using method SW 846
6010 B and SW 846 7470 A, free cyanide, oil & grease, and phenol. Samples are shipped to an off-site
independent laboratory via priority overnight delivery on the day they are collected.  In  addition to the
process monitoring sample locations, the filter press feed sludge and the filter press cake solids are
sampled monthly. The samples are  collected as grab samples.  The filter press feed sludge sample is
analyzed for total suspended solids.  The filter press cake is sampled for percent total solids. Additional
monthly samples have been collected from each of the extraction trenches for VOC analysis.

Quarterly process monitoring sampling is no longer required and was discontinued in 1994 after the first
year of operation.
                                           12

-------
TCLP sampling for Filter Press Cake solids disposal is conducted once every five (5) years. Sampling is
conducted in October to ensure analytical results are received in time for the certification process.  A grab
sample is collected from the Filter Press Cake solids and shipped to an outside approved/contract
laboratory via priority overnight delivery.
                                            13

-------
            3.0    SYSTEM OBJECTIVES, PERFORMANCE, AND
                                CLOSURE CRITERIA
3.1     CURRENT SYSTEM OBJECTIVES AND CLOSURE CRITERIA
The ROD for the Millcreek Site identified the following Remedial Action Objectives (RAOs):
    •  Prevent onsite air dispersal of particles containing potentially hazardous substances
    •  Prevent direct dermal contact with potentially hazardous substances
    •  Prevent offsite transport of contaminated soil and sediment via erosion or storm water transport
    •  Remediate offsite ground water contamination to ground water protection goals
    •  Remediate soil contamination to safe soil levels capable of preventing future ground water
       contamination
    •  Remediate sediment contamination capable of causing an impact on aquatic life or wildlife in the
       wetlands and Marshall Run
    •  Remediate potential surface water contamination by remediating ground water, soil, and sediment
       contamination
The cleanup standards specified in the ROD are the EPA derived treatment standards in the following
table.
Chemical
Vinyl Chloride (VC)
TCE
1,2-DCE
1,2-DCA
1,1,1- TCA
1,1 -DCE
Chloroform
Benzene
Xylene (total)
Toluene
Ethyl Benzene
Lead
Copper
Arsenic
Cadmium
Chromium III
Chromium VI
1986 ROD Ground Water Protection Goals
(fig/L)
0.015
1.8
70
0.95
22
0.24
0.19
0.70
440
2000
680
11
27
50
3
341
11
                                        14

-------
Chemical
Mercury
Zinc
Nickel
Iron
Manganese
1986 ROD Ground Water Protection Goals
(|Ag/L)
0.012
710
150
300
50
3.2     TREATMENT PLANT OPERATION STANDARDS
The treatment standards for discharging the treated water to the Marshall Run are the based on a NPDES
equivalency permit with the following monitoring and reporting requirements.
Parameter
Flow
COD
Conductivity
TOC
TSS
O&G
Iron (dissolved)
Iron (total)
Manganese
Arsenic
Cadmium
Chromium, Total
Copper
Lead
Mercury
Nickel
Zinc
10A Phenol
Vinyl Chloride
Cyanide (free)
Trichloroethene
1 , 1 -Dichloroethene
1,1,1 -Trichloroethane
pH
Average
Monthly
Max. Daily
Instant.
Max.
Monitoring only
Monitoring only
Monitoring only
Monitoring only
30
15
0.3
1.5
1.0
0.05
0.01
0.05
0.01
0.05
0.002
0.322
0.04
0.005
0.002
0.005
0.005
0.007
0.20
60
—
0.6
3.0
2.0
0.10
0.02
0.10
0.02
0.10
0.004
0.64
0.08
0.010
0.004
0.01
0.01
0.014
0.40
75
30
0.7
3.7
2.5
0.13
0.03
0.13
0.025
0.13
0.005
0.80
0.10
0.012
0.005
0.013
0.013
0.02
0.50
Measurement
Frequency
Daily
5/week
5/week
5/week
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
1 /month
Sample Type
Measured
Grab
Grab
Grab
8-hr comp.
3 grab/8 -hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.
8-hr comp.*
Grab
Grab
Grab
Grab
Between 6.0 and 9.0 standard units at all times
Additional notes are provided, including specific analytical methods for mercury and phenol.
* The RSE team was informed that VOC samples are grab samples. The indication that vinyl chloride is
an 8-hour composite sample may be a misprint in the O&M manual or may have been modified to a grab
sample since the printing of the O&M manual.
                                       15

-------
                                    4.0   FINDINGS
4.1     GENERAL FINDINGS

The observations provided below are not intended to imply a deficiency in the work of the system
designers, system operators, or site managers but are offered as constructive suggestions in the best
interest of the EPA and the public. These observations have the benefit of being formulated based upon
operational data unavailable to the original designers. Furthermore, it is likely that site conditions and
general knowledge of ground water remediation have changed over time.
4.2     SUBSURFACE PERFORMANCE AND RESPONSE

4.2.1         PLUME CAPTURE

Previous Modeling Effort

The Draft RPO report included an evaluation of a previously constructed model and evaluated capture
using this model and particle tracking; however, insufficient information was provided to determine the
validity of this evaluation. Some of this missing information or concerns include the following:

    •  The simulated vs. observed heads for a model run using 2004 pumping conditions are not
       encouraging, especially in the vicinity  of the trenches, suggesting a poor calibration.

    •  The mass balance of the model, which is important for confirming that the model correctly solves
       the  equations that govern ground water flow, was not provided for any of the model runs.  A poor
       mass balance would invalidate the results.

    •  Changes were obviously made to the model to change the extraction rate from the trenches from
       those  in 2004 to those in 2008, but the  model changes that were made were not clear.  The drain
       boundary condition was likely used, but this would require a change in hydraulic parameters, and
       this change was not stated.

    •  Various symbols are used to represent  various hydraulic heads on the simulated vs. observed head
       plots, but the meaning of these various symbols was not provided. It is unclear how the
       observation points used for calibration were  selected, which points are in the shallow zone and
       which points are in the deep zone.

    •  Insufficient water level  information is available to determine the direction of ground water flow
       north  of the site to clearly establish regional  ground water flow and the fate of contamination after
       it leaves the landfill. The figures indicate that water flows toward Marshall Run to the west of the
       cemetery; however, there is another equally likely location for ground water to discharge to
       surface water near the intersection of 8th Street and Peninsula Drive (see Figure 1).
       Contamination has been detected at MW-32  (in the direction of 8th Street and Peninsula Drive) to
       an equal or greater extent that at the MW-25 cluster (in the direction of the cemetery).
                                          16

-------
    •  Model construction parameters, including hydraulic conductivity distribution, model layer
       thicknesses, boundary condition values, etc. are not provided.

    •  The model does not appear to simulate the hydraulic head mound near MW-11, which is
       presumably caused be infiltration from the pond in this location. This mound is a prominent
       feature on Zone B potentiometric surface maps.

    •  The particle tracking did not initiate any particles in the vicinity of the MW-42 cluster where
       significant contamination is present.

    •  The vertical release points of the particles are unclear. The particles should be released from
       various vertical locations to determine the vertical extent of the capture zone.

    •  The reason for waviness in the upgradient hydraulic head contours (e.g., the 715 foot contour) is
       unclear.

The model run using 2008 pumping conditions suggests a gap in capture, and although the simulated vs.
observed heads appear to be close (suggesting a decent calibration), these results should not be accepted
without addressing the above issues and integrating the data obtained from the recommended field
investigations (Section 6).
HGL Capture Zone Analysis

The HGL capture zone analysis apparently used MODFLOW as interpolation software and then used
MODPATH for particle tracking to evaluate capture.  The study concluded that there was a gap in capture
between Trenches #1 and #3. The RSE team raises a number of issues with respect to this analysis.

    •    MODFLOW is a numerical ground water modeling tool and not a contouring tool. The use of
        MODFLOW as interpolation software is not atypical application of MODFLOW, and additional
        detail should be provided to describe the process for generating the potentiometric surface map.

    •    Professional judgment should be used when preparing potentiometric surface maps rather than
        relying mainly on the output of contouring software.  For this analysis, note the contours between
        Trench #5 and MW-28B.  There are no other points between these two points, and the software
        linearly interpolated the water levels between these two points. This is likely not accurate
        because the gradient between the two points is likely not linear.  There is likely a much steeper
        change in the hydraulic gradient near the trench and a more linear or uniform change further
        upgradient of the trench.  In this case, there is a bias of flow between MW-28B and the low point
        in the center  of the trench, resulting in the appearance that significantly more particles flow
        toward Trench #5 than Trench # 1. Despite Trench # 1 and Trench #5 extracting a similar amount
        of water, particles make a sharp turn away from Trench #1 to flow toward Trench #5.

    •    The water levels measured in the trenches are assigned to a single point within the trench, and the
        contouring is based on these individual points. Given the construction of the trenches, it is likely
        more appropriate to assign the water level from each trench along the entire length of the trench.

    •    The capture zone analysis is only based on a single water level event, and based on the historical
        water level information, it appears that plume capture may be sensitive to variations in recharge.
                                           17

-------
    •   Conducting a capture zone evaluation using a potentiometric surface map is only one line of
        evidence and the results from this one line of evidence alone is often quite inconclusive given
        relatively sparse water level data from available monitoring points.

    •   The capture zone memorandum does not provide the average extraction rates from the trenches at
        the time the water levels were measured.  This is important in general when interpreting capture
        from a potentiometric surface map.  In this case, it is particularly important because the trench
        water levels were used in the analysis and the trenches are known to cycle during operation.  If
        the trench monitoring points are being used in developing the potentiometric surface maps, then it
        is not only important to  know the average extraction rates but also the rate at the time the
        measurements were collected and where each trench was in its individual pumping cycle.

Based on the above points, the RSE team believes that the potentiometric surface map used for the
capture zone analysis is unreliable and that the capture zone analysis as whole is incomplete.

The recent EPA capture  zone document (EPA 600/R-08/003) specifies that it is not appropriate to use
water levels from operating extraction wells in the development of potentiometric surface maps unless
those water levels are corrected  for well losses.  In this case, however, the TMPs in these trenches are
within the trench backfill and not in the sumps or trench piping.  Therefore, these monitoring points are
not necessarily influenced by well losses and are likely appropriate to use in the analysis. As stated
above, however, professional judgment should be used in interpreting the weight of this water level when
interpreting contours far from the trenches.

Potentiometric Surface Maps

The potentiometric surface maps presented in the 2008 Annual Ground Water Monitoring Report are
informative, but the RSE team raises the following issues with regard to interpreting the  contours:

    •   Contours  should likely be drawn without allowing the water levels from the monitoring points
        within the active trenches from determining contours far from the trenches.

    •   For the purpose  of drawing the water levels in the vicinity of the trenches, the water levels
        measured in the  trenches should likely extend the full length of the trenches rather than just the
        center of the trenches.

    •   The water levels in the trench monitoring points vary substantially as a result of recharge and
        potentially from varying the pumping rates of the trenches. The following table  summarizes the
        water level variation for each of the  extraction trenches in October 2008, which is the month that
        corresponds to the  potentiometric surface map included in the 2008 Annual Ground Water
        Monitoring Report.

Trench # 1
Trench #2
Trench #3
Trench #4
Trench #5
Minimum
Water Level
(ft msl)
703.8
699.2
703.5
704.5
699.6
Maximum
Water Level
(ft msl)
705.5
704.1
704.5
705.2
706.3
Difference between
Maximum and Minimum
(ft)
1.7
4.9
1.0
0.7
6.7
                                           18

-------
       The flow rate in Trench # 1 the day prior to the water level event was the lowest flow rate in that
       well for the month of October 2008.  Although similar data are not available for water level
       measurements in nearby monitoring wells, the RSE team believes that the water levels may also
       vary considerably in wells close to the trenches such as MW-38A/B and MW-39A/B. This
       variation could result in preparing potentiometric surface maps that are  representative of an
       "instant" in time rather than the average conditions at the site.  The site team should post the
       extraction rates for each of the trenches at the time of the water level event and the average flow
       over the two or three days preceding the event.

    •  The measured water level at MW-25B is high relative to what would be expected, suggesting the
       potential for local recharge, a well construction issue, and/or a surveying issue. Because this well
       is important for understanding general flow directions and contaminant fate and transport at the
       site, the causes for this anomalous value should be investigated.

Consideration of these above issues could have a profound effect on the interpretation of ground water
flow and plume capture. The RSE team notes several aspects of the 2008 potentiometric surface maps
and water levels that are favorable for capture because they indicate an inward gradient (i.e., ground water
flow back toward the trenches), but qualifies that these findings are subject to the uncertainty associated
with water level and flow rate variations of the trench pumping:

    •  The water level at MW-12 is higher than the water levels at MW-38A/B, MW-39A/B. This
       pattern is consistent over many water level events.

    •  The water levels at MW-11 and MW-35 are higher than the water levels at MW-41A/B and MW-
       42A/B, and the water levels at MW-41A/B and MW-42A/B are higher than the water levels at
       MW-23A/B, MW-40A/B, and MW-43A/B.  It should be cautioned, however, that the water level
       at MW-11 may be locally influenced by recharge from the pond and the actual mounding might
       be smaller in extent than depicted.

    •  The water level at MW-31  is higher than those at MW-43A/B, MW-44A/B, and MW-45B.

    •  There is a relatively strong gradient between the MW-40 cluster and the MW-3 9 cluster, though
       this gradient has not always been  present in other water level events. When present, the gradient
       between the MW-40 cluster and the MW-3 9 cluster may indicate that Trench #1 may be
       capturing some contamination in the vicinity of the MW-40 cluster.

If extraction pumping at the time of the 2008 water level event is representative of average ortypical
pumping conditions, water levels and potentiometric surface maps appear to suggest an inward gradient in
many locations, which would suggest some degree of hydraulic capture.  Additional water level
measurement points, particularly in Zone  A, and consideration of variations due to recharge and trench
extraction rates would strengthen this line of evidence.

It appears that much of the hydraulic capture provided in the northern corner of the site is provided by
Trench #2.  It appears that the high extraction rate from this trench (potentially in combination with
extraction from upgradient Trench #4) may be capturing the contamination in the vicinity of the MW-41
and MW-42 clusters.  This would be an inefficient means of providing capture because it involves
sustaining a high enough extraction rate to pull contamination back, rather than  intercepting
contamination as it migrates downgradient. It may also be inefficient because Marshall Run appears to be
                                           19

-------
contributing water to these trenches based on the measured water levels and stream level presented in the
HGL capture zone analysis.
Concentration Trends

The downward trend in VOC concentrations at MW-11 is supportive of plume capture along the
northwestern boundary; however, this downward trend may be the result of clean water infiltrating from
the pond and diverting contaminated water around MW-11. The downward trend in VOC concentrations
at MW-32, MW-43A/B, MW-44A/B, and MW-45A/B suggest capture along the northeastern boundary.
The concentrations are historically too low at MW-12, MW-25A, and MW-25B to determine if capture is
effective.  The historically low concentrations suggest that little or no contamination reached these points
prior to P&T operation. The absence of contamination at these points may be indicative of attenuation
prior to reaching these locations or that ground water from the site did not flow through these points prior
to remedial pumping, which would indicate that the wells might not be properly located to evaluate plume
capture.

The concentration trends at some wells (e.g., MW-41 cluster and MW-42 cluster) are not useful for
evaluating plume capture because the wells are sufficiently close to the extraction trenches that they may
be within the capture zones of the trenches. Nevertheless, the concentrations for cis-l,2-DCE at MW-
41 A/B appear to be declining. The relatively stable concentration of VC in these two wells (compared to
the decreases in cis-l,2-DCE) might suggest that the two contaminants follow separate flow paths
(potentially due to different sources) or that VC reductions are offset by VC production from the
dechlorination of cis-l,2-DCE. Conditions at the site, as measured by an  ORP of less than -50 mV (and
in many cases less than -100 mV), support anaerobic degradation.  Additional sampling points in both
Zone A and Zone B that are clearly outside of the capture zone would help determine the extent of the
plume that exists beyond the extraction network and whether or not concentrations beyond the extraction
network are declining as a result of capture.
A Note about the Target Capture Zone

All of the above comments discuss interpreting capture in the Zones A and B.  However, it is likely that
deeper contamination is present and may not be captured by the current extraction system.  Section 6 of
this report discusses characterization efforts to vertically delineate the contamination and determine the
target capture zone.
 4.2.2          GROUND WATER CONTAMINANT CONCENTRATIONS

VOC concentrations in ground water appear to be decreasing in many wells while remaining relatively
stable in other wells.  The following table summarizes the concentration trends at each of the monitoring
wells.  To facilitate interpretation of the results, the monitoring wells are characterized as either
upgradient of the extraction trenches, in the immediate area of the extraction trenches, or downgradient of
the extraction trenches.
                                           20

-------
Mon. Well
Concentration Trend
Comment
Upgradient of Extraction Trenches
MW-23A
MW-23B
MW-28A
MW-28B
MW-33A
MW-33B
MW-46A
MW-46B
MW-47A
MW-47B
Below standards
No obvious trend
Decreasing
Decreasing
Below standards
Decreasing
Increasing
No obvious trend
Potentially increasing
No obvious trend


Concentrations are now non-detect
Decreasing since 2002 and now below standards

Concentrations are now generally non-detect

Decreasing for 1,1 -DCA
Relatively low concentrations
Relatively low concentrations
Immediate Area of Extraction Trenches
MW-12
MW-37A
MW-37B
MW-38A
MW-38B
MW-39A
MW-39B
MW-40A
MW-40B
MW-41A
MW-41B
MW-42A
MW-42B
MW-43A
MW-43B
MW-44A
MW-44B
MW-45A
MW-45B
Below standards
Decreasing for VC
Decreasing for VC
Potentially increasing
Decreasing
Potentially Increasing
No obvious trend
Decreasing for cis-l,2-DCE
Potentially increasing
Decreasing for cis-l,2-DCE
Decreasing
No obvious trend
Increasing
Decreasing
Decreasing
Decreasing
Decreasing
Decreasing
Decreasing
Low detections of cis-l,2-DCE prior to P&T operation
cis-l,2-DCE is typically below standards
cis-l,2-DCE is typically below standards

Increase then decrease with P&T, now non-detect


No trend or slowly decreasing trend for VC

No trend or slowly decreasing trend for VC


Increasing since the P&T system began operation

Concentrations are now generally non-detect

Concentrations are now generally non-detect
Decrease began after P&T system began operation
Concentrations are now generally non-detect
Downgradient of the Extraction Trenches
MW-11
MW-25A
MW-25B
MW-29
MW-31
MW-32
MW-35
Decreasing
Below standards
Below standards
Below standards
No obvious trend
Decreasing
Below standards
Concentrations are now generally non-detect

Low detections of cis-l,2-DCE prior to P&T operation


Concentrations are now generally non-detect

Notes: Shading indicates results that are favorable for plume capture and/or restoration

The results in the above table generally indicate favorable results for plume capture and restoration for
many of the monitoring wells located near the extraction trenches and for all but one of the monitoring
wells downgradient of the extraction trenches. This general finding, however, should be qualified by the
absence of monitoring wells in critical locations of Zones A and B and the absence of vertical delineation
of the contamination.
                                           21

-------
Wells with no obvious trend or increasing trends are discussed below:

    •  MW-46A/B - MW-46A has an increasing trend of VC with recent concentrations near 100 ug/L,
       and MW-46B has declining concentrations of cis-l,2-DCE and 1,2-DCA but stable
       concentrations of VC near 10 ug/L. The most significant increases at MW-46A appear to have
       occurred after P&T operation began in 1997. Prior to P&T operation, the VC concentrations were
       relatively stable at or below 26 ug/L. Since that time, the VC concentration has increased to as
       high as 144 ug/L in 2007.  This apparent link to the start of the P&T system suggests that the
       contamination observed at MW-46A may be a result of ground water flow directions changing
       with the onset of P&T operation and contamination being  redistributed. MW-46A is located
       upgradient of the trenches. Therefore, the increase in concentration at this location is not
       indicative of a gap in plume capture.

    •  MW-38A & MW-39A - The VC concentrations at these two Zone A wells appear to be
       increasing, especially when the 2007 and 2008 results are  included.  MW-38A and MW-39A
       screen the 5-foot interval below Trenches #1 and #5. That is, the screened intervals of MW-38A
       and MW-39A are approximately 689 to 694 feet above mean sea level, respectively, and the
       bottom elevations of Trenches #1 and #5 are approximately 695 feet. However, these wells are
       sufficiently close to extraction Trenches #5  and #1, respectively, that the wells may  be in the
       capture zones of the trenches.  Although detailed numerical modeling is beyond the  scope of an
       RSE, the RSE team did informal numerical  modeling with MODFLOW (results not presented
       here) to study the vertical and horizontal influence of a recovery trench. The modeling involved
       simulating a partially penetrating trench in a homogeneous aquifer, generally matching conditions
       to those of Trench #1 at the site, calibrating to the October 2008 heads at MW-39B and MW-46B,
       and assuming that the vertical hydraulic conductivity is two orders of magnitude lower than the
       horizontal hydraulic conductivity. Based on this informal modeling, the RSE team believes that,
       in the absence of significant heterogeneity, the  capture zones for Trench #1 and Trench #5 likely
       extend significantly deeper than the screened intervals of MW-38A and MW-39A and that MW-
       38A and MW-39A are likely within the capture zones of the trenches. However, it is possible
       that contamination is present below or to the sides of the capture zone and is therefore not
       captured. It is also possible that there may be significant heterogeneity or other site-specific
       features that could limit the vertical influence of the trenches.

    •  The RSE team recognizes the increasing trend in VC at MW-39A and at upgradient MW-46A
       and believes there is likely a link between the increases in these two wells. One possibility is that
       ground water extraction with the trenches caused a change in ground water flow patterns that has
       caused contamination to migrate toward these wells rather than the direction it would migrate  in
       the absence of pumping.  The RSE team notes that, according to the historical data presented  in
       Appendix E of the Draft RPO report, prior to system operation VC was undetectable in these two
       wells.

    •  MW-40B - The concentration trends for cis-l,2-DCE and VC in this well do not show an obvious
       relationship to the operation of the P&T system.  The well is upgradient of the extraction
       trenches, and therefore cannot be used for assisting with a capture zone evaluation.

    •  MW-42A/B - cis-l,2-DCE concentration decreases at MW-42B appear to be related to the
       initiation of P&T operation in the mid-1990s.  The VC concentrations at this well may have also
       been influenced by P&T operation. The concentrations of these two compounds at MW-42A
       have generally been stable. These changes or lack of changes in concentrations do not
       necessarily mean that these wells are within the capture zone of the trenches. The screened
                                           22

-------
       interval for MW-42A is from approximately 688 to 693 feet above mean sea level, and the
       bottom of Trench #2 is at approximately 693 feet above mean sea level. The interval screened by
       MW-42A (though not necessarily at the location of MW-42A) is very likely captured by Trench
       #2. However, contamination is not vertically delineated in the vicinity of MW-42A.
4.3     COMPONENT PERFORMANCE

4.3.1         EXTRACTION SYSTEM

With the exception of Trench #3, the extraction system appears to be performing as expected. The
extraction rate from Trench #3, however, is substantially lower than that of the other trenches and
substantially lower than expected. The site team indicated that this may be a combination of fouling
and/or damage/collapse of the trench.

4.3.2         METALS REMOVAL SYSTEM

The metals removal system consists of potassium permanganate addition, flash mixing, solids recycling,
addition of polymer, flocculation, and settling in an IPC. The metals removal system appears to operate
as intended with few operational complications. Approximately 3,600 pounds of potassium
permanganate are used per year for treatment.  The metals removal system is the rate limiting step for the
treatment plant. The treatment plant currently operates at approximately 90 to 95 gpm and can operate as
high as 105 gpm before there is significant solids carryover from the clarifier.

4.3.3         AIR STRIPPER

The air stripper is a packed tower with a hydraulic capacity of 120 gpm. Two 2-HP blowers that provide
approximately 1,000 cfm at 5.5 inches of water are provided for aeration and alternate operation. Two 3-
HP transfer pumps, each with a capacity of 100 gpm at a total dynamic head of 35 feet, alternate
operation and are located between the equalization tank and the air stripper to pump the water to the top
of the air stripper.  Air stripper operation has been reliable. Cleaning the packing material with muriatic
acid has been required twice a year.  The packing material has not been changed since operation began.

Influent VOC concentrations are approximately 10 ug/L of TCE, 120 ug/L of cis-l,2-DCE, and 40 ug/L
of VC. This is substantially lower than the initial influent VOC concentrations. For comparison, the
concentrations of the same constituents in 1994 were approximately 40 ug/L of TCE, 1,000 ug/L of cis-
1,2-DCE, and 70 ug/L of VC. The air stripper should easily be able to accommodate the existing influent
concentrations and provide some  additional capacity. The RSE team does not have sufficient design
information for the air stripper to accurately determine the additional loading that it could accommodate.
The RSE team notes some limited concern regarding the air stripper performance.  From January through
May 2009, the effluent cis-l,2-DCE concentration was approximately 3.0 ug/L. Although this is well
below standards, the air stripper should have easily reduced the cis-l,2-DCE concentration to a non-detect
value. This may be the result of the air stripper packing fouling and the need for cleaning.

4.3.4         SOLIDS HANDLING

Solids that settle in the IPC  are either recycled with a progressive cavity pump to the head of the metals
removal system to enhance floe formation and improve  settling or by diaphragm pump to the solids
                                          23

-------
holding tank with a working capacity of 1,000 gallons.  Approximately 18,000 to 37,000 pounds of lime
are added each year to the solids holding tank to improve solids quality for dewatering.

The solids are dewatered with an 8 cubic foot filter press that is operated every day or every other day.
Dewatered sludge totaling approximately 80 to 100 tons per year is stored in a 20 cubic yard roll-off
container that is removed from the site approximately eight times per year. Analytical results confirm
that the dewatered solids are non-hazardous, and filter cake is disposed of at the Lake View Landfill in
Erie, Pennsylvania, approximately 10 miles from the site.  Air for operating the diaphragm pumps for
solids transfer and dewatering is provided by two 20-HP air compressors that alternate operation and
operate intermittently.

4.3.5          SYSTEM CONTROLS

Systems controls are relatively limited compared to similar systems.  Although there are emergency
shutoffs and alarms for conditions such as high levels in tanks, high pressure differential across the air
stripper, etc., the pumps in the extraction trenches are run manually rather than automatically, and the
chemical feed rates for polymer and permanganate are also manual.  This lack of control requires the
operator to respond to alarms quickly to avoid discharges of permanganate, polymer, or other process
chemicals to the discharge locations.

4.3.1         PH ADJUSTMENT

Sulfuric acid is added to the retention pond prior to using the treated water for irrigation so that the water
will be pH 7. pH adjustment is not required when treated water is discharged to Marshall Run.
4.4     COMPONENTS OR PROCESSES THAT ACCOUNT FOR MAJORITY OF
            ANNUAL COSTS

The project status reports suggest an annual cost of $413,000 per year for site-related activities, including
project management, data analysis, reporting, sampling, and treatment system O&M. Although
information was provided to the RSE team regarding chemical and utility costs a complete breakdown of
costs was not provided. The following table summarizes annual costs, including RSE team estimates
where actual data are not available.
                           Item Description
       Project management, data validation/evaluation, reporting :
       Treatment Plant O&M
          O&M labor4
          Utilities - electricity2
          Utilities - natural gas (for heating)2
          Utilities - other (phone, sewer)2
          Treatment chemicals3
          Waste disposal4
          Treatment plant analytical costs (on-site and off-site analyses)
          Miscellaneous parts, service, contingency4
       Total treatment plant O&M
Approximate Annual Cost
                $125,000
                $150,000
                 $12,000
                  $4,000
                  $3,000
                 $23,000
                 $16,000
                 $12,000
                 $30,000
                $250,000
                                          24

-------
                           Item Description
       Ground water sampling5

       Laboratory analysis (ground water only)4
                                     Total Estimated Annual Cost
Approximate Annual Cost
                 $20,000
                 $18,000
                $413,000
         Based on the amount spent or estimated to be spent during 2009 as indicated in the progress reports
         From utility bills and published utility rates
       3 From the treatment plant operator
       4 Estimated by the RSE team based on described monitoring programs, assuming approximate
       analytical costs of $90 for VOCs, $200forSVOCs, $100 for metals, $50 for general chemistry,
       $25 for oil & grease, $25 for free cyanide, $25 for phenols, and between SI and $2 per on-site test
       kit analysis. A duplicate sample for each parameter is assumed each month for process sampling.
       The cost for QA samples for ground water monitoring is assumed to be a 30% increase in the cost
       of analyses for the monitoring wells.
       5 Estimated by the RSE team assuming $2,500 per day for travel, labor,  and equipment for a two-
       person crew, 3 days for the April event and 5 days for the October event.
4.4.1          UTILITIES

The utilities account for less than 5% of the total costs for the site. The treatment plant does not pay for
potable water. A trade has been made between the plant and the city, where the treatment plant provides
irrigation water for the public golf course and the treatment plant is provided with potable water free of
charge.

4.4.2          NON-UTILITY CONSUMABLES AND DISPOSAL COSTS

The consumables and disposal costs account for approximately 10% of the total annual cost for the site.
The waste disposal costs are estimated by the RSE team based on roll-off costs of $300 per two week
period (one example bill was provided), $80 per ton for disposal, and disposal of 100 tons per year.

4.4.3          LABOR

Labor is the largest component of the annual costs for the system.  The majority of the project
management/data evaluation/reporting budget is cost associated with labor and more than half of the
ground water sampling cost is labor. Combining the project management cost, 50% of the ground water
sampling cost, and the treatment plant operator costs results in over $290,000 or 70% of the total annual
costs.

The RSE team has estimated atypical cost of $150,000 for full-time operator labor based on 2080 hours
at a fully loaded rate of $65 per hour plus approximately 30 days per year of support from another
operator/technician.

4.4.4          CHEMICAL ANALYSIS

Chemical analysis costs were estimated by the RSE team based on typical laboratory costs for VOCs,
metals, SVOCs, and general chemistry and estimates of the materials/test kits that would be needed for
the on-site analyses.
                                           25

-------
4.5     APPROXIMATE ENVIRONMENTAL FOOTPRINTS ASSOCIATED WITH
            REMEDY
4.5.1
ENERGY, AIR EMISSIONS, AND GREENHOUSE GASES
This section focuses on the carbon footprint of the remedy to provide an indication of greenhouse gas
footprint. For this simplified analysis, the carbon footprint is also used as a proxy for energy usage and
emissions of other pollutants such as nitrogen oxides and sulfur dioxide because most of the energy usage
results from combustion of fossil fuels and the predominant sources of carbon dioxide, nitrogen oxides,
and sulfur dioxide are from the combustion of fossil fuels. The annual emissions for carbon dioxide for
the current system are presented in Table 4-1. The largest contributors are electricity usage (59% of the
total footprint), natural gas usage for heating the treatment plant (18% of total footprint), chemical or
laboratory analysis (11%), and treatment chemicals (8%).  All other sources appear to be negligible.

The emissions of hazardous air pollutants associated with the site primarily result from air stripper off-gas
or vapor intrusion. These items are discussed in Section 5 of this report in the context of protecting human
health and the environment.
4.5.2
WATER RESOURCES
The ground water remedy has a limited affect on water resources in the area. Although some potable
water is used for the treatment process, substantial amounts of treated water are used for irrigation of the
local golf course. The majority of water used in the region is from Lake Erie, and water is not a scarce
resource.
4.5.3
LAND AND ECOSYSTEMS
The ground water remedy has a limited effect on the land and local ecosystems because the infrastructure
is either below ground or contained in the treatment building. The land has been redeveloped as a golf
course and the treated water is used for irrigation.
4.5.4
MATERIALS USAGE AND WASTE DISPOSAL
The materials usage and waste disposal associated with the remedy are due to the need to remove iron and
manganese from the treated water. The materials used and waste disposed of are as follows:
Item
Lime
Potassium permanganate
Hydrochloric acid
Sulfuric acid*
Polymer (dry)
Waste disposal
Approximate Annual
Usage
18,000 to 37,000 pounds
3,600 pounds
300 gallons
800 gallons
375 gallons
80 to 100 tons
      *Sulfuric acid is used to condition the water for irrigation and is not required for treatment

Suggestions are provided in Section 6 to reduce some of the materials usage and waste disposal.
                                         26

-------
4.6    RECURRING PROBLEMS OR ISSUES

No recurring problems or issues were reported other than those mentioned in Section 4.7.


4.7    REGULATORY COMPLIANCE

Two chemical releases to surface water have occurred during treatment plant operation, and both of them
were due to a lack of automation in controlling chemical feed rates. Because the extraction trenches and
chemical feed rates are manually controlled, when a trench pump unexpectedly shuts down, the chemical
feed does not automatically adjust. On one occasion an excess of potassium permanganate was released
to Marshall Run when an extraction trench unexpectedly shut down. A similar release occurred with
polymer. In both cases, no harm was caused to human health and no permanent harm was caused to the
environment.



4.8    SAFETY RECORD

No health and safety issues were identified during the RSE site visit.
                                       27

-------
     5.0    EFFECTIVENESS OF THE SYSTEM TO PROTECT HUMAN
                         HEALTH AND THE ENVIRONMENT
5.1     GROUND WATER

The ground water remedy appears to currently be protective of human health and the environment, but
additional information is required to 1) confirm the plume is not migrating off-property and to 2) confirm
that there is no human exposure through vapor intrusion in the vicinity of MW-31 (if the contamination at
MW-31 is site-related).  Several recommendations are provided in Section 6.0 to help evaluate control of
the plume, and a recommendation is included to determine if the contamination at MW-31 is site-related.

Vapor intrusion sampling has been conducted near the site but not necessarily  in the vicinity of MW-31.
The sub-slab and indoor air sampling that was conducted and documented in Technical Memorandum for
Vapor Intrusion Sampling at the Millcreek Dump Site, August 28, 2008 indicated concentrations of
chemicals above screening levels, but the chemicals detected are not consistent with those currently
observed at the site.  One potential explanation for the detections is one or more household sources. MW-
31 has continuing elevated concentrations of VC in shallow ground water and  is approximately 300 feet
northeast of the vapor intrusion study area (i.e., 300 feet further from the site than the vapor intrusion
study area). Given that  VC was not detected in the vapor intrusion study area  it is likely that the observed
VC at MW-31 is not site-related. However, the suggested investigations will help determine if the VC at
MW-31 is site related. If it is, then the site team should delineate  the contamination and test sub-slab and
indoor air for VC in the  immediate vicinity of MW-31. If it is not  site-related then the regulating authority
will likely need to identify the source, conduct appropriate ground water investigation, and evaluate
indoor air and remedial  options.


5.2     SURFACE WATER

Marshall Run flows adjacent to the site. As indicated in the HGL Capture Zone evaluation, the measured
stage  of Marshall Run and the water levels in the nearby monitoring wells show that water from Marshall
Run is extracted by the extraction trenches rather than site-related contamination discharging to Marshall
Run.  The water quality of Marshall Run appears to be protected by the remedy but the water level or
flow rate may be adversely affected.


5.3     AIR

Please refer to Section 5.1 for discussions related to indoor air.  Other impacts to air include a  discharge
of contaminants through the untreated air stripper off-gas. With respect to compliance, the mass of
contaminants emitted to the air is approximately 0.004 kg  per hr, which is equivalent to approximately
0.09 kg per day, or 32 kg per year and is therefore substantially less than 1 megagram per year of
hazardous air pollutant emissions that typically applies to site remediation from a compliance perspective.

Given this emission rate and the air stripper flow rate of approximately 1,000 cfm the concentration of
VOCs in the air stripper off-gas is approximately 2,200  ug/m3. Based on the influent concentrations to
the treatment plant, approximately 25% of this concentration (i.e., approximately 550 ug/m3) is due to
                                          28

-------
VC.  For comparison, the VC target indoor air concentration level from the Draft EPA Subsurface Vapor
Intrusion Guidance is approximately 0.28 ug/m3 for a 10~6 incremental cancer risk.  Dilution is expected
between the air stripper off-gas tower and surrounding potential receptors. Under conservative, stable
conditions, the RSE estimates using Gaussian dispersion modeling that the ground level VC concentration
approximately 200 feet from a 30 foot air stripper stack would be significantly less than this target indoor
air concentration and therefore likely protective of human health and the environment.


5.4     SOIL

The soil remedy was completed, leaving soil in place and providing a clean cover. Soils were not
specifically evaluated as part of this RSE.
5.5     WETLANDS AND SEDIMENTS

Wetlands and sediments were part of OU-2 and were not specifically addressed as part of this RSE.
                                          29

-------
                            6.0    RECOMMENDATIONS
Cost estimates provided herein have levels of certainty comparable to those done for CERCLA Feasibility
Studies (-30%/+50%), and these cost estimates have been prepared in a manner generally consistent with
EPA 540-R-00-002, A Guide to Developing and Documenting Cost Estimates During the Feasibility
Study, July, 2000.  The costs presented do not include potential costs associated with community or
public relations activities that may be conducted prior to field activities. The costs and sustainability
impacts of these recommendations are summarized in Tables 6-1 and 6-2.
6.1     RECOMMENDATIONS TO IMPROVE EFFECTIVENESS

6.1.1         FURTHER CHARACTERIZE EXTENT OF CONTAMINATION

The plume is not vertically delineated (particularly near MW-42A), and there is an insufficient number of
wells off-property to horizontally delineate the contamination or monitor concentration trends in the
shallow zone (Zone B), intermediate zone (Zone A), and deep zone (deeper than Zone A).  The RSE team
suggests the following additional characterization by using direct-push drilling to collect grab samples.
Suggested sample locations are presented in Figure 2:

    •   Vertically delineate contamination in the northern corner of the site in the vicinity of MW-42A.
       Collect grab samples from at least two depth intervals below MW-42A and analyze the samples
       for VOCs to characterize contamination down to the top of the shale  layer.

    •   Horizontally delineate the contamination at MW-42A (and any contamination detected deeper
       than MW-42A) to the northwest, north, and northeast. Collect grab samples at three more depth
       intervals equal to or deeper than MW-42A to the northwest, north, and northeast of MW-42A (see
       Figure 2 for potential locations).  The results of these samples will help  identify pathways where
       contamination has not been captured by the extraction system over the past 10 years. Where
       contamination is identified at concentrations comparable to on-property concentrations,
       permanent monitoring wells may be appropriate for long-term monitoring of concentration trends
       (see Section 6.1.2).

    •   Determine if contamination is present downgradient of MW-39A, MW40A, and MW-41A off-
       property at depth. Collect grab samples off-property to the northwest of these wells in multiple
       locations at three or more depth intervals that are equal in depth or deeper than these wells.  See
       Figure 2 for suggested locations. The results of these samples will help identify pathways where
       contamination has not been captured by the extraction system over the past 10 years. Where
       contamination is identified at concentrations comparable to on-property concentrations,
       permanent monitoring wells may be appropriate for long-term monitoring of concentration trends
       (see Section 6.1.2). Note that the RSE team has not specifically recommended vertical
       delineation in the vicinity of MW-39A, MW-40A, and MW-41A. The RSE team believes that
       these locations are likely within the capture zones of the trenches and the detection of
       contamination in these locations would not necessarily contribute to plume delineation and
       capture zone evaluation in the same manner as the recommended locations. The RSE team,
                                          30

-------
       however, would not object or disagree with the site team if the site team preferred to vertically
       delineate at these locations.

    •  Determine if declining concentrations in MW-11 are due to infiltration of clean water from the
       pond or due to plume capture by the extraction system. Collect grab samples "side-gradient" to
       MW-11 in Zone B.  See Figure 2 for locations.

    •  Determine if contamination at MW-31 is site-related or due to another source.  Collect shallow
       grab samples between the landfill property and MW-31 as depicted in Figure 2. If contamination
       at MW-31 is determined to be linked to the Site, then another field event should be conducted to
       delineate the characterize the contamination at depth.

Any number of techniques can be used to collect these grab samples, including hydropunch or direct push
points. The RSE team will defer to the site team for their local expertise to  determine the appropriate
method. The RSE team suggests, however, that cores be obtained and logged from key locations so that
informative geological cross-sections can be prepared. Given that sampling at depths of up to 50 feet or
more may be required, the site team should arrange for a sufficiently large direct push machine.

Figure 2 illustrates a total of 15 locations and a total of 39 samples. The RSE team has attempted to
locate the  sample points where access will not be an issue.  The RSE team estimates that this
characterization may take up to 8 days in the field at an approximate cost of $50,000, including laboratory
analysis, waste disposal, preparation of boring logs, and reporting. These costs and this recommendation
do not include the installation of permanent monitoring wells that may be needed for long-term
monitoring in these locations. The following recommendation involves the installation of some
permanent points, but other permanent monitoring wells may be needed as well.

6.1.2       INSTALL ADDITIONAL POINTS FOR WATER LEVEL MEASUREMENTS

The understanding of ground water flow off-property is fairly limited in Zone B and very limited in Zone
A. With respect to Zone B, the modeling that has been conducted and the potentiometric surface maps
that have been developed do not correlate very well with observed off-property contamination. The
modeling and potentiometric surface maps suggest water flows toward the MW-25 cluster and the
daylighting of Marshall Run to the east of the cemetery. However, significant levels of contamination
continue to be observed at MW-31, and the VOC concentrations at MW-32 have historically been higher
than those at MW-25.  The Zone B potentiometric surface maps are highly biased by the MW-25B water
level (actually, the MW-25A water level since the MW-25B result is anomalous) because MW-32 is not
gauged. The potentiometric surface maps for Zone A differ significantly from those  in Zone B, but this
may be to  the lack of monitoring points in Zone A. It is unclear if there is a difference in the strata that
would cause a difference between the Zone A and Zone B potentiometric surface maps. The reviewed
Zone A potentiometric surface map is highly dependent on the results from  the MW-25 cluster because
there are no other off-property monitoring wells or piezometers in this zone to suggest that ground water
flows in another direction.

The RSE team recommends the following off-property piezometers for improving the understanding of
the of ground water flow in the  area:

    •  One well co-located with MW-11 but deeper is recommended to determine if the mounding
       observed in  MW-11 is also present in Zone A or deeper. The depth to be chosen might be based
       on the water quality results from the direct push event. This point should be  installed as a
       monitoring well to allow for sampling.
                                          31

-------
    •  One well co-located with or slightly northwest of MW-12 but deeper is recommended to improve
       the interpretation of ground water flow in the vicinity of Trenches #1 and #5. The water level
       differences between MW-12 and MW-38B/39B suggest and inward gradient and capture in the
       shallow zone.  A deeper well in this location or slightly northwest may provide similar
       information for deeper zones.  The depth to be chosen might be based on the water quality results
       from the direct push event. This point should be installed as a monitoring well to allow for
       sampling. The MW-29 location was not chosen for this purpose because it is too far down
       gradient to provide the hydraulic information. The RSE team does not suggest abandoning MW-
       12 as is suggested in the Draft RPO report, unless MW-12 is damaged or otherwise not providing
       reliable information.

    •  Any wells installed for long-term water quality monitoring resulting from the findings of the
       characterization recommended in 6.1.1 co-located with or northwest, north, and northeast of MW-
       42A are recommended to be used for measuring water levels.  At a minimum (i.e., even if no
       wells are installed resulting from the characterization in 6.1.1), this should include one deep well
       co-located with MW-42A and one other deep well (depths to be determined based on findings
       from the characterization). The RSE team  expects that at a maximum, this might include four
       deep wells (depth to be  determined based on characterization), including one co-located with
       MW-42A, one co-located with MW-35, one midway between MW-35 and MW-11, and one 300
       feet south of MW-35 in the street. The RSE team assumes that any of the wells installed as part of
       this effort would be in similar  locations to the suggested direct push sample locations presented in
       Figure 2. The RSE team recognizes that these points may be too far from the trenches to allow
       the potentiometric surface map to be used effectively for interpreting capture, but the water level
       nevertheless provide useful information for understanding ground water flow and for future
       modeling efforts, if any.

Additional points are not suggested because it is unclear if a reasonable number of water level points
would provide enough information to substantially improve the potentiometric surface maps. Rather, the
RSE team suggests a capture zone evaluation based on several converging lines of evidence (see Section
6.1.4).

All of the above points should be surveyed, and during the survey effort the site team should consider
resurveying all site wells if such an effort has not recently been done. At a minimum, the MW-25A,
MW-25B, MW-11, and any other wells with potentially questionable survey data should be resurveyed.

For the purpose of this recommendation, the RSE team assumes that six wells will be installed with
hollow stem auger for atotal of 200 vertical feet (e.g., each of the five wells is 40 feet deep). The RSE
team estimates that this effort, including drilling, disposal, and survey would cost approximately $40,000.
Sampling the wells once per year for VOCs would  likely increase the cost of the ground water monitoring
program by approximately $4,000 per  year, including laboratory analysis.
6.1.3        CONDUCT A SHUTDOWN AND RESTART TEST OF THE EXTRACTION SYSTEM

After the above-mentioned wells are installed, the RSE team suggests conducting a shutdown test of the
entire extraction system and individual shutdown and restart tests for each of the extraction trenches to
better understand ground water flow in the absence of pumping and to gain information from the transient
data due to pumping.  Understanding ground water flow in the absence of pumping may help
conceptually with preparing potentiometric surface maps under pumping conditions.  It will also provide
                                          32

-------
the hydraulic gradient in the absence of pumping, which is useful in conducting a ground water flow
budget for the site. The transient data can be used to estimate hydraulic conductivity and storativity in the
vicinity of the trenches (i.e., pumping tests using the extraction trenches). The transient data will also
help the site team better understand how the cycling of the trenches might affect water level
measurements in and around the trenches so that these effects can be considered during development of
the potentiometric surface maps.

Prior to the shutdown test of the entire system, conduct a site-wide water level event that includes the new
and resurveyed monitoring points, MW-32, and the stage of Marshall Run in a few locations. For the
shutdown test of the entire system, discontinue pumping from all of the extraction trenches. After
approximately 4 or 5 days of non-pumping conditions, collect a site-wide water level event that includes
the new and resurveyed monitoring points, MW-32, and the stage of Marshall Run in a few locations.
Based on the above information, develop potentiometric surface maps for pumping and non-pumping
conditions. Utilize conceptual information from the potentiometric surface map for non-pumping
conditions to assist with developing the potentiometric surface map under pumping conditions. Use
kriging or interpolation software augmented by professional judgment for developing the potentiometric
surface maps. Document any software settings or assumptions made in developing the maps. Also
document the average pumping rates of the trenches and any cycling of the trench pumping leading up to
the water level event.

The RSE team has purposely avoided collecting transient data during the shutdown test of the entire
system because it is expected that the influence of stopping or restarting one trench will influence water
levels in neighboring trenches.  In addition, the RSE team wants to minimize the amount of time that
extraction is discontinued.

For the shutdown and restart tests of the individual extraction trenches, the following steps are suggested:

    •    Place pressure transducers  and begin recording water levels in the subject trench TMP, nearby
        monitoring wells in Zones A and B, and one monitoring well that is expected to be outside of the
        zone of influence of all extraction trenches. As an example, for Trench #5, place transducers in
        the TMP, MW-38A, MW-38B, MW-12, and the new deep well proposed north of MW-12.  The
        site team could also consider adding transducers in MW-39A, MW-39B, and the TMP for Trench
        #1.

    •    Document the extraction rates and cycling of the trench pumping for two days prior to the event
        (while transducers are recording). As best as possible, document fluctuations in precipitation and
        trench extraction rates.

    •    Shutdown the subject extraction trench for three days and then restart the extraction trench. The
        transducers should continue to record during this entire  period plus a day or two after the trench
        was restarted. As best as possible, maintain steady flow rates in other extraction trenches during
        this time. Document precipitation events.

    •    Remove the transducers from the wells, download the data, interpret the data, and move the
        transducers to the monitoring wells for the testing of the next trench.

For each trench, use MODFLOW to construct a simple model of a single trench to simulate the transient
data from nearby transducers.  Based on a good calibration, estimate the hydraulic conductivity and
storativity.  For model construction, use trench construction information and the trench pumping rate. For
calibration, use the transient data from the trench monitoring point nearby monitoring points.
                                           33

-------
Using the hydraulic conductivity and the non-pumping hydraulic gradient for each trench, conduct a
simple water budget analysis for each trench. That is, compare the amount of water extracted from the
trench with the amount of water flowing through a given cross-section of the aquifer.  For example,
during informal modeling, the RSE team estimated that the hydraulic conductivity near Trench #1 might
be approximately 30 feet per day. Based on this value and an assumed non-pumping hydraulic gradient
of 0.0025 feet per foot, and an aquifer thickness of approximately 50 feet, the RSE team estimates that
approximately 1,875 cubic feet per day of ground water flows through a 500-foot width of the aquifer as
follows:

                             Q = Thickness x  Width x Darcy Velocity

                        1,875ft3/day = 50ft x 500ft x 0.0025ft/ft x 30ft/day

For comparison, the approximate extraction rate of the trench is approximately 20,000 gallons per day
(2,700 cubic feet per day). This extraction rate is approximately 1.44 times higher than the calculated
ground water flow volume. Therefore, assuming a factor of safety of approximately 1.44, and based on
the example values used here, it would be reasonable to estimate that Trench #1 has a capture zone that is
approximately 500  feet wide and approximately 50 feet deep. Conducting these analyses will help the
site team determine if the current extraction rates approximate the extraction rates that are necessary for
plume capture.  These results can be used as one potential line of evidence in a capture zone analysis  (see
below).

The RSE team estimates that this recommendation might  cost $50,000 to implement assuming $20,000
for the field effort (including transducer rentals) and $30,000 for data management, interpretation, and
presentation.

6.1.4        DOCUMENT THE FINDINGS FROM THE ABOVE EVENTS, USE FINDINGS FOR
             CAPTURE ZONE ANALYSIS

With the above information, the site team should have several lines of evidence for conducting a capture
zone evaluation. The direct push sampling should provide an indication of the  depth of the target capture
zone as well as if and where contamination might have been migrating through the extraction system over
the past 10 years. Continued monitoring at new monitoring wells (installation and locations dependent on
the direct push sampling) should allow the site to determine if contamination continues to migrate through
the extraction system (or a modified system) in the future. Additional points for water level
measurements and additional considerations during development of the potentiometric surface maps
should provide additional information with respect to interpreting capture based on water levels. Finally,
the simplistic capture zone analysis based on a water budget and location-specific gradient and hydraulic
conductivity information should provide another line of evidence to evaluate capture.  These three lines of
evidence taken as a group should either confirm or deny successful capture and help the site team
determine how the extraction system might be modified.  Much of the work for this analysis is discussed
(and the costs accounted for) in the above recommendations. The RSE team assumes that an additional
$15,000 might be needed to compile the results, interpret  them  as a whole, and prepare a report.

If the information from the above capture zone analysis is inconclusive, then the RSE team suggests
revisiting the site modeling, taking into consideration the  items mentioned in Section 4 of this report and
calibrating the model to the steady-state water level data from pumping and non-pumping conditions  and
to the transient data from the shutdown tests. The RSE team estimates that this modeling might add  an
additional $30,000 to the above costs, depending on the updates, modifications, or corrections that might
                                           34

-------
be needed to be made to the existing model. The model would provide the additional benefit of allowing
the site team to simulate various pumping scenarios that might result in reduced extraction while
maintaining the same level of plume capture.

See Section 6.4 for additional comments regarding a path forward.
6.1.5       AUTOMATE CHEMICAL FEEDS OR PROVIDE APPROPRIATE INTERLOCKS TO
            DISCONTINUE CHEMICAL FEEDS IF ONE OR MORE EXTRACTION TRENCHES
            DISCONTINUE OPERATION

The two treatment plant excursions resulted from chemical feeds continuing at the same rate after process
flow rates dropped due to unexpected shutdown of one or more extraction trenches.  There are two
primary methods of addressing this. One is to automate the chemical feeds based on flow rate, which
would take some adjustment and trial and error, and the other is to force treatment plant shutdown if the
process flow rate decreases below a critical value for a set amount of time. The latter method may be
made more practical if variable frequency drives (VFDs) are installed on the extraction pumps, and
decreases in flow trigger an increase in the extraction rate from one or more trenches to compensate for
the decreased flow. The approach with the VFDs has the added benefit of the treatment plant operator
being able to better control or set flow from each extraction trench and to save electricity when operating
pumps where flow would otherwise be throttled manually with a valve.  The installation of the VFDs
would not likely pay for itself. This modification, if made, would therefore be done for treatment plant
effectiveness or sustainability reasons and not for cost savings.

The approximate cost for implementing the first or second approach is likely on the order of $25,000. If
the VFDs are purchased for six extraction pumps (i.e., both pumps in three of the trenches), then there
would likely be an additional cost of $15,000.

6.1.6       IF OFF-SITE SHALLOW CONTAMINATION is IDENTIFIED AND DETERMINED TO BE
            RELATED TO  THE SITE, CONDUCT A VAPOR INTRUSION EVALUATION

The direct-push study might identify contamination off-site and might link the shallow contamination at
MW-31 to the site. If off-site shallow contamination, such as that at MW-31, is detected and is
determined to be related to the site, then the site team should conduct a vapor intrusion evaluation. Given
the shallow water table and nearby residences, the RSE team assumes that this study would involve sub-
slab sampling.  If off-site contamination is identified at depth in a given location but is below clean
shallow water, then the vapor intrusion pathway is incomplete and a vapor intrusion study is not merited
in that location.

If the contamination at MW-31 is determined to result from a separate source, then the regulating
authority will likely need to identify the source of contamination and pursue a separate characterization,
risk assessment, and remediation effort.

No costs are provided for this recommendation because the scope is uncertain.
                                         35

-------
6.2     RECOMMENDATIONS TO REDUCE COSTS

6.2.1        DISCONTINUE APRIL SAMPLING EVENT

The current April sampling event provides little additional benefit to evaluating plume capture or
documenting aquifer restoration. Six of the wells are located upgradient of the extraction network and are
therefore monitoring progress toward restoration, which is a relatively slow process and is adequately
monitored by an annual event. More importantly, the concentration trends at the wells do not look
different if the semi-annual data are removed. The magnitude of contamination should not be used to
determine sampling frequency, rather the additional information that is gained by sampling during
additional events should be the deciding factor.  The semi-annual event can be eliminated from the
sampling program.  If there is concern regarding seasonality, the season with the higher concentrations
should be selected for the annual event.  There is also little value in measuring water levels at only a
subset of the monitoring wells during the Spring. The Spring water level measurement event should
either be discontinued or converted into a full water level measurement event.

Eliminating the semi-annual sampling event should save approximately $15,000 per year in sampling
costs based on the costs provided in the progress reports. If the water level event is maintained and
converted into a full event, the savings might only be $13,000 per year. Additional savings should also be
realized from discontinuing the report that summarizes the semi-annual event. The semi-annual water
level event and potentiometric surface map can be presented and described in the annual  report. Based on
the costs provided, eliminating the semi-annual sampling report might save another $15,000 plus
additional reductions in data validation and data management.

The semi-annual event is the only event where SVOC samples are collected. Although some SVOCs
were original contaminants of concern, it appears that SVOCs are  no longer detectable in ground water
and can be eliminated from the monitoring program. If the site team feels there is a need to continue
sampling for SVOCs, it can likely be done at select monitoring wells every five  years in anticipation of a
Five-Year Review.

6.2.2        DISCONTINUE ANALYSIS FOR DISSOLVED METALS

Analysis of ground water samples from the annual event and process water include both total and
dissolved metals. Although dissolved metals is often helpful in characterizing the metals in ground water
at a site, there is sufficient existing information to conclude that the majority of metals in site ground
water are in the dissolved phase.  Given that regulatory decisions regarding the site will not be made
based on dissolved metals results and that the dissolved metals do not provide valuable information, the
RSE team suggests eliminating this set of analyses from both the ground water and process water
sampling. Given an estimated cost of $100 per dissolved metals sample and approximately 60 samples
per year for both ground water and process water sampling, eliminating the dissolved metals analysis
should result in an annual savings of about $6,000 per year in analytical costs plus additional savings
associated with less data management and validation. Analysis for dissolved iron will need to continue at
the treatment plant effluent to meet the requirements of the treatment plant discharge, but this is a
negligible cost relative  to the $6,000 in savings.

6.2.3        STREAMLINE PROCESS SAMPLING

The process sampling program likely provides more information than is needed to operate the plant.
Streamlining this program could reduce operator level of effort, potentially help reduce the need for
planned additional operator support, and reduce reporting efforts.  The plant is currently staffed by one
                                          36

-------
operator, but the budget and the plan is to add a technician on half-time basis. Implementing this and
other modifications might help avoid adding the additional half-time staff.

Measurement of pH and turbidity are important parameters to monitor, particularly at the IPC effluent
where the results are used to evaluate the performance of the metals removal, but the monitoring results
for other parameters and other locations are not necessary and could likely be dropped from the program
without sacrificing treatment plant effectiveness. Although total suspended solids is an important
parameter for evaluating IPC effectiveness, IPC effectiveness can be effectively monitored (and is
effectively monitored at other sites) with turbidity.  Eliminating the total suspended solids sample from
three locations, all parameters  from the other locations, and the associated reporting should save a little
time each day for both sampling, weekly reporting, and progress reporting.  The weekly sampling for total
manganese and dissolved iron at the IPC influent are also important because they too can be used to
confirm potassium permanganate dosing and metals removal effectiveness.  The other aspects of the
weekly monitoring (including TOC analysis and metals analysis at other sample ports) could also be
dropped from the program. The savings in materials from these monitoring modifications is likely
negligible, but the time savings may be important for avoiding additional operator labor and for reducing
the reporting level of effort.
6.2.4
REVISIT DAT A AND REPORTING COSTS
Approximately $100,000 is allocated to data validation/reporting in 2009, which seems to be high relative
to the monthly discharge monitoring reports (DMRs), quarterly progress reports, semi-annual ground
water report, and annual ground water report.  The following table summarizes reasonable, suggested
costs for these items, including data validation.
Item
DMRs
Quarterly progress reports
Data validation
Semi-annual report (including data management & interpretation)
Annual report (including data management & interpretation)
Total
Suggested,
Reasonable
Annual Cost
$12,000
$12,000
$8,000
$15,000
$15,000
$62,000
The discrepancy between the allocated $100,000 and the above RSE-estimated $62,000 may partially be
due to the preparation of the Draft RPO report, but this should not be an ongoing expense, and the
reporting budget should likely be $62,000 per year given the current reporting scope. If the above
suggested changes to the monitoring program are made, then additional savings should also be realized
for the data and reporting task.  The following table summarizes what reporting costs might be if the
above-suggested monitoring changes are made.
Item
DMRs
Quarterly progress reports
Data validation
Annual report (including data management & interpretation)
Total
Suggested,
Reasonable
Annual Cost
$12,000
$8,000
$4,000
$15,000
$39,000
                                           37

-------
6.2.5       REDUCE OR ELIMINATE LIME CONDITIONING OF SLUDGE

The majority of the solids that are disposed of at the site are from adding lime to the metals removal
sludge for conditioning prior to dewatering.  Approximately 5,000 pounds of iron and manganese are
removed from ground water per year, and approximately 1,300 pounds of manganese is added per year
due to the addition of potassium permanganate. These metals precipitate  out as oxides and hydroxides,
resulting in approximately 12,000 pounds of solids per year.  By contrast, approximately 25,000 pounds
of lime is added.

Although lime conditioning of waste activated (biological) sludge is common, lime conditioning for metal
hydroxide sludge such as that found at the Millcreek Site is typically not needed.  Another common
conditioner for biological sludge is ferric chloride (in addition to lime) because it forms ferric hydroxide
solids that add bulk to the biological sludge. The large majority of solids removed by the metals removal
system at Millcreek are iron hydroxide.  Reducing or eliminating the lime addition should reduce
chemical costs by about $5,000 per year and decrease waste disposal fees by a similar amount.  Less
potable water would be used for making the lime, and operator time associated with adding the lime and
extra filter press pulls could be allocated to other tasks.  Currently, the operator needs to batch between
one and two bags of lime per day and operate the filter press once a day or once every other day. The
operator should experiment with reducing lime conditioning and evaluating dewatering performance.

These modifications, along with the process monitoring modifications, should help avoid the need for
additional operator support.
6.3     RECOMMENDATIONS FOR TECHNICAL IMPROVEMENT
6.3.1        CLEANUP UP TREATMENT PLANT

The treatment plant is generally functioning as intended but was somewhat disorderly during the RSE site
visit. The treatment plant could be organized better and cleaned up to avoid potential health and safety
issues.

6.3.2        CONSIDERATIONS REGARDING TREATMENT PLANT MODIFICATIONS, IF
            NECESSARY

The RSE team cautions that the limiting capacity of the treatment system is not just the air stripper but the
metals removal system, which can only handle up to 105 gpm before there is significant carry over from
the IPC.  If the treatment plant needs to be modified to handle flow higher than 105 gpm, the budgeting
should incorporate not only a new air stripper but also a metals removal system with a larger hydraulic
capacity.

The metals removal system does not include filtration of the IPC effluent.  As such, solids will continue
to foul the air stripper. If the air stripper requires modification to increase hydraulic capacity and/or high
influent concentrations, a tray aerator should be considered to facilitate cleaning.
                                         38

-------
6.4     CONSIDERATIONS FOR GAINING SITE CLOSE OUT

6.4.1        DETERMINING A PATH FORWARD

The RSE team finds it unlikely that even aggressive remedial efforts will be able to achieve the cleanup
standards (particularly 0.015 ug/L for VC) for this site in a reasonable time frame. In addition, the RSE
team believes that if concentrations above this standard are not permitted to migrate beyond a short
distance from the property boundary (e.g., as part of a natural attenuation component of the remedy), then
hydraulic containment is the preferred approach because other technologies (e.g., in-situ bioremediation)
may not be able to reliably meet this low standard. An appropriate path forward therefore depends on the
answers to two primary questions:

    •  What is the potential for allowing low contaminant concentrations to migrate off-site as part of a
       natural attenuation remedy for the dilute plume?

    •  Can the existing system reasonably provide plume capture?

The answer to the first question would depend on the outcome of a natural attenuation evaluation and the
site team's  interpretation of a reasonable distance from the property boundary for attenuation to occur. If
the low concentration areas of the plume can be allowed to naturally attenuate, then the overall plume size
requiring active remediation might be substantially smaller, making it more practical to target remediation
in areas with high concentrations (perhaps with in-situ bioremediation or targeted pumping).
Furthermore, if the area for targeted remediation is sufficiently small, then P&T may be abandoned for in-
situ bioremediation.  By contrast, if the remedy will need to continue to prevent contamination above
standards from migrating beyond a short distance from the property boundary, then the future remedy will
likely continue to involve P&T. The  RSE team cautions against the use of P&T and in-situ
bioremediation or in-situ chemical oxidation in overlapping areas because the in-situ remedies could lead
to fouling and operational difficulties for the P&T system.

The answer to the second question should be available after implementing the above recommendations. If
the P&T system is incapable of providing adequate capture, but low-level contamination is allowed to
migrate and naturally attenuate beyond the property boundary, then it might be possible to discontinue
pumping or substantially reduce pumping from some of the extraction trenches in favor of increasing
extraction in areas where it is needed. If the P&T system is incapable of providing adequate capture and
the contamination is not permitted to  migrate above standards beyond a short distance from the property
boundary, then upgrades to both the extraction system and treatment system will likely be needed.  In this
case, the modeling described in Section 6.1.4 should be conducted to help design an appropriate
extraction system. All modifications or upgrades to the treatment plant should be postponed until a final
flow rate has been determined.

The RSE team suspects that the current system likely provides a reasonable degree of capture but that the
overall flow rate might need to be increased to the maximum treatment plant capacity and/or that
extraction rates from various trenches might be redistributed to close gaps in capture. If new extraction
points are required, extraction wells would likely provide sufficient additional extraction capacity and
would be better suited to extracting deeper ground water than installing new trenches.  Likewise, if
extraction is needed  in the vicinity of Trench #3, the RSE team believes it would be more cost-effective to
install an extraction well than to repair or reinstall the trench. The RSE team estimates that a 6-inch, 50-
foot deep, PVC extraction well might cost on the order of $30,000, including well installation, pump
installation, wiring, and controls.  A well in this area, if it is needed,  should likely be screened from 20
                                           39

-------
feet below ground surface to the bottom of the unconsolidated material. During operation, care should be
given to avoid dewatering the well screen.

Although the RSE team has not thoroughly considered the option, if the hydraulic conditions are
appropriate, the site team could consider damming Marshall Run in the vicinity of Trench #4 to increase
the creek stage and create a higher constant head boundary to prevent ground water from migrating to the
northeast in this location. This might cause a small influx of water into the site at this location, but it
would also free-up the approximately 25,000 gpd of capacity (from discontinuing operation of Trench #4)
so that extraction could be increased in other portions of the site without requiring an increase in
treatment plant capacity. Further consideration of this option (if appropriate) would likely require an
impact assessment of the creek and model simulations to evaluate effectiveness.

For analysis and reporting only (not additional field work or well installation), the RSE team expects that
up to $50,000 will be needed for contractor support in determining a path forward. This funding would
include the above-mentioned evaluation, plus initial feasibility analysis of various remedial options and
potentially focused feasibility or conceptual designs for remedial options that do not significantly differ
from the current remedy.


6.5     RECOMMENDATIONS FOR IMPROVED SUSTAINABILITY

6.5.1        REVISED APPROACH TO METALS REMOVAL

The treatment plant influent appears to already meet the discharge standard for manganese, and
manganese is one of the principal reasons why potassium permanganate is needed for metals removal. A
metals removal process that involves minor pH adjustment and aeration may have an overall lower
footprint than continuing with the permanganate oxidation. A detailed footprint analysis is not conducted
because insufficient information is available on the footprint of potassium permanganate, though it likely
does have a larger footprint than aeration and the small amount of caustic or lime that would be needed
for pH adjustment.

One potential approach to implementing this metals removal approach is to replace the existing air
stripper with a non-fouling type air stripper (e.g., one  manufactured by Specialty Systems Integrators),
and operate the system in Mode A where water flows through the air stripper, removes volatiles and
oxides the water for solids removal.  This approach would likely require pilot testing to confirm that the
discharge standards could be met.  The modifications  might require $100,000 to implement, but savings
on the order of $ 10,000  per year would be realized from discontinuing the use of potassium
permanganate, and the modifications would likely pay for themselves over  10 or more years.
6.5.2        CONSIDERATIONS FOR RENEWABLE ENERGY AT THE SITE

Although the site is large, the presence of the golf course limits the potential development of solar energy
on the ground. The roof of the treatment building, however, could likely support approximately 10 kW of
installed solar. A system of this size could provide approximately 10,000 to 12,000 kWh of electricity
per year.  The installed price for a system of this size (given approximate current market prices) might be
on the order of $70,000.  The annual savings from offset energy (less than $1,000 per year) would not
provide a reasonable payback for the system.  To apply or assign the renewable energy generated by the
system to the site, the renewable energy credits generated from such as system should be "retired" by the
site rather than sold to another party. As a result, the renewable energy credits would not help offset the
                                          40

-------
cost. A state grant program is in place that could potentially offer a grant on the order of $20,000 for this
type of project, but 1) the grant, which is partially administered by PADEP, does not apply to state run
facilities and 2) the payback from offset energy would still be on the order of 50 years.

With the respect to wind power, the future expansion of the airport may complicate implementation of
wind energy.  There is no active gas extraction system for landfill gas, so the use of landfill gas is also not
a renewable energy option.
Cost Analysis and Rationale for Green Tags

Renewable energy can also be used to power the P&T system by purchasing "green tags" or renewable
energy certificates. The market price is approximately $0.025 per kWh.  It would therefore cost
approximately $4,000 additional per year to power the P&T system with renewable energy that is
generated elsewhere in the country/region. Comparing this option to the solar option described above,
this option would have no upfront capital costs but would cost approximately $40,000 additional over the
next 10 years (assuming green tag prices do not increase) to address all of the system electricity usage.
By comparison, the solar option described above would still be approximately $60,000 from breaking
even after 10 years and would have addressed less than approximately 10% of the system's electricity
usage during that 10-year operation period.
                                           41

-------
Table 4.1 Energy and Atmosphere Footprint Analysis

Energy
Electricity
Natural gas
Diesel
Gasoline
Energy subtotal

Materials and Chemicals
Treatment chemicals
Materials subtotal

Waste Disposal
Non-hazardous waste disposal
Disposal subtotal

Other Services
Chemical analysis (on-site and
laboratory)
Other services subtotal

Treatment Process Emissions
Air stripper off-gas
Process emissions subtotal

P&T System Total
Quantity

140,000
4,000
196
310



23,000



100



$30,000



Unit

kWh
ccf
gallons
gallons



dollars



tons



dollars



CO2 equiv (Ibs)
emission
factor
(Ibs/unit)

1.15
12.2
22
19



1



25



1



total

161000
48800
4312
5890
220002


23000
23000


2500
2500


30000
30000


no GHGs emitted











275502
%of
Total

58%
18%
2%
2%
80%


8%
8%


1%
1%


11%
11%





100%

-------
                         Usage and Emission Factor Notes for Table 4-1.

Except where otherwise noted, information regarding emission factors was obtained from eGRID, EPA
Climate Leaders Program, the National Renewable Energy Laboratory life-cycle inventory at
www.nrel.gov/lci, or the EUROPA Reference Life-Cycle Database. Costs used in deriving emission
factors are consistent with costs during late 2010. The emissions factors developed here are rough
approximations based on simplifying assumptions. They are intended to provide only approximate
environmental footprints to help understand the affects potential changes to the remedy may have on the
footprint of the remedy.

Electricity

Quantity -  140,000 kWh, see report text for additional information

Emission Factor - Based on eGRID2007 for RFCE output emission rate for base-load using equivalency
ratios of 21:1 methane to carbon dioxide and 310:1 nitrous oxide to carbon dioxide from
http://www.epa.gov/solar/energv-resources/calculator.html
Diesel

Quantity - 196 gallons per year based on 0.023 gallons per ton-mile of transport in a single-unit truck, for
100 tons of waste per year transported 10 miles to local landfill and 15 tons of lime per year transported
approximately 500 miles from source to site.

Emission Factor - 22 pounds of carbon dioxide per gallon of diesel (Climate Leaders)

Gasoline

Quantity - 310 gallons per year based on usage for treatment plant operator commute and travel for
ground water sampling. For local treatment plant operator, assume 20 miles round trip in a passenger car
(20 miles per gallon) for 260 trips per year.  For ground water sampling, assume technicians travel once
per event from Pittsburg, PA in a light duty truck (assume 10 miles per gallon).  For two round trips, this
is approximately 500 miles, which results in approximate usage of 50 gallons per year.

Emission Factor - 19 pounds of carbon dioxide per gallon of gasoline (Climate Leaders)


Materials & Chemicals

Quantity - $23,000 of chemical usage.

Emission Factor - 1 pound of carbon dioxide per dollar of materials/chemicals based on 10% of the cost
of the materials resulting from the direct use of fossil fuels or electricity derived from fossil-fuels and
approximately pounds of carbon dioxide per dollar spent on energy. This is equivalent to a blend of
energy usage from electricity, diesel, and gasoline assuming approximately $0.10 per kWh , $2.80 for
diesel, and $2.70 for gasoline.

-------
Non-Hazardous Landfill Disposal

Quantity - 100 tons per year based (see text for more information)

Emission Factor - 25 pounds of carbon dioxide per ton, based on the carbon emissions from EUROPA
file location: Inert waste disposal. Inert waste used so that methane and carbon dioxide from
decomposing waste is not included.


References

Climate Leader GHG Inventory EPA-430--K-08-004, May 2008

EGRID 2007 v 1.1

(EUROPA) European Reference Life Cycle Database (ELCD core database), version II compiled under
contract on behalf of the European Commission - DG Joint Research Centre - Institute for Environment
and Sustainability with technical and scientific support by JRC-IES from early 2008 to early 2009.
(http ://lca.j re .ec .europa.eu/lcainfohub/datasetArea.vm)

National Renewable Energy Laboratory (NREL), Life-Cycle Inventory Database (www.nrel.gov/lci)
maintained by the Alliance for Sustainable Energy, LLC.

-------
Table 6-1. Cost Summary Table
Recommendation
6.1.1 Further Characterize
Extent Of Contamination
6.1.2 Install Additional Points
For Water Level Measurements
6.1.3 Conduct A Shutdown
And Restart Test Of The
Extraction System
6. 1.4 Document the Findings from
the Above Events, Use Findings
For Capture Zone Analysis
6.1.5 Automate Chemical Feeds or
Provide Appropriate Interlocks to
Discontinue Chemical Feeds if
One or More Extraction Trenches
Discontinue Operation
6.1.6 If Off-Site Shallow
Contamination Is Identified And
Determined To Be Related To The
Site, Conduct A Vapor Intrusion
Evaluation
6.2.1 Discontinue April Sampling
Event
6.2.2 Discontinue Analysis for
Dissolved Metals
6.2.3 Streamline Process Sampling
Reason
Effectiveness
Effectiveness
Effectiveness
Effectiveness
Effectiveness
Effectiveness
Cost-
Effectiveness
Cost-
Effectiveness
Cost-
Effectiveness
Additional
Capital Costs
($)
$50,000
$40,000
$50,000
$15,000
to $45,000
$25,000
To
$40,000
Not estimated
$0
$0
Estimated
Change in
Annual Costs
($/yr)
$0
$4,000
$0
$0
$0
Not estimated
($30,000)
($6,000)
Estimated
Change in
Life-Cycle
Costs
$*
$50,000
$160,000
$50,000
$15,000 to
$45,000
$25,000
To
$40,000
Not estimated
($900,000)
($180,000)
Discounted
Estimated
Change in
Life-Cycle
Costs
$**
$50,000
$118,000
$50,000
$15,000 to
$45,000
$25,000 to
$40,000
Not estimated
($588,000)
($118,000)
Not quantified, but can help limit additions to operator labor

-------
Recommendation
6.2.4 Revisit Data and Reporting
Costs***
6.2.5 Reduce or Eliminate Lime
Conditioning of Sludge
6.3.1 Cleanup Treatment Plant
6.3.2 Considerations Regarding
Treatment Plant Modifications, If
Necessary
6.4.1 Determine a Path Forward
6.5.1 Revised Approach to Metals
Removal
6.5.2 Considerations for
Renewable Energy
Reason
Cost
Effectiveness
Cost
Effectiveness
Technical
Improvement
Technical
Improvement
Site Closure
Sustainability
Sustainability
Additional
Capital Costs
($)
$0
$0
$0
$0
$50,000
$100,000
Estimated
Change in
Annual Costs
($/yr)
($46,000)
($10,000)
$0
$0
$0
($10,000)
Estimated
Change in
Life-Cycle
Costs
$*
($1,380,000)
($300,000)
$0
$0
$50,000
($200,000)
Discounted
Estimated
Change in
Life-Cycle
Costs
$**
($902,000)
($196,000)
$0
$0
$50,000
($96,000)
Cost Analysis Provided for Solar Energy and Renewable Energy
Certificates
Costs in parentheses imply cost reductions
* assumes 30 years of operation with a discount rate of 0% (i.e., no discounting)
** assumes 30 years of operation with a discount rate of 3%
*** presented cost savings is the current reporting cost of $100,000 minus the suggested cost of $39,000 minus the
$15,000 that was already counted for recommendation 6.2.1

-------
                          Table 6-2. Sustainability Summary Table
            Recommendation
     Reason
     Effects on Sustainability
6.1.1    Further Characterize Extent Of
Contamination
  Effectiveness
     Additional minor footprint
   associated with collecting and
 analyzing samples.  Information is
    critical to evaluating remedy
 	protectiveness	
6.1.2    Install Additional Points For Water
Level Measurements
  Effectiveness
     Additional minor footprint
   associated with installing wells.
 Information is critical to evaluating
       remedy protectiveness
6.1.3    Conduct A Shutdown And Restart
Test Of The Extraction System
  Effectiveness
 A small decrease in the footprint is
  expected while the P&T system is
            shut down.
6.1.4 Document the Findings from the
Above Events, Use Findings For Capture
Zone Analysis
  Effectiveness
   None beyond the improvement
  evaluating remedy protectiveness
6.1.5 Automate Chemical Feeds or Provide
Appropriate Interlocks to Discontinue
Chemical Feeds if One or More Extraction
Trenches Discontinue Operation
  Effectiveness
  Should ultimately help protect the
   water resource of Marshall Run
6.1.6    If Off-Site Shallow Contamination
Is Identified And Determined To Be Related
To The Site, Conduct A Vapor Intrusion
Evaluation
  Effectiveness
 Potential additional minor footprint
   associated with collecting and
    analyzing samples if study is
 conducted.  Information is critical to
  evaluating remedy protectiveness
6.2.1 Discontinue April Sampling Event
Cost-Effectiveness
    Potential decrease in remedy
    footprint from reduced field
 mobilization and reduced laboratory
	analysis	
6.2.2 Discontinue Analysis for Dissolved
Metals
Cost-Effectiveness
    Potential decrease in remedy
  footprint from reduced laboratory
             analysis
6.2.3 Streamline Process Sampling
Cost-Effectiveness
    Potential decrease in remedy
   footprint from materials usage.
6.2.4 Revisit Data and Reporting Costs
Cost Effectiveness
              None.

-------
            Recommendation
     Reason
     Effects on Sustainability
6.2.5 Reduce or Eliminate Lime
Conditioning of Sludge
Cost Effectiveness
  Potential substantial decrease in
   remedy footprint from reduced
 materials usage and reduced waste
            generation
6.3.1 Cleanup Treatment Plant
    Technical
  Improvement
              None.
6.3.2 Considerations Regarding Treatment
Plant Modifications, If Necessary
    Technical
  Improvement
              None.
6.4.1 Determine a Path Forward
   Site Closure
The path forward could substantially
    alter the remedy footprint if a
different remedial technology is used
 or if the extraction rate for the P&T
   system is significantly altered.
6.5.1 Revised Approach to Metals Removal
  Sustainability
    Potential decrease in remedy
  footprint from reduced materials
usage and reduced waste generation.
6.5.2 Considerations for Renewable Energy
  Sustainability
  Cost Analysis Provided for Solar
   Energy and Renewable Energy
            Certificates

-------
FIGURES

-------
INTERNATIONAL,
 AIRPORT
                                             REFERENCE:
                                       4000  BASE MAP IS A PORTION OF THE U.S.G.S. 7.5
                                             MINUTE TOPOGRAPHIC SERIES SWANVILLE, PA
                                             QUADRANGLE. DATED: 1957, PHOTOREVISED  1990
                                             SCALE:  1" = 2000', CONTOUR INTERVAL IS  10
                                             FEET, NGVD 1929.
                        SCALE IN FEE?
QUADRANGLE LOCATION
                                      Figure 1. Alternate groundwater flow paths.

-------
Notes: Base map taken from Figure 4 of the 2008
Annual Groundwater Monitoring Report, URS.

 © Shallow location

 .« Deep location with two or more sample
   intervals deeper than MW-42A

   Deep location with three or more sample
 O intervals equal to and/or deeper than 30 feet
   bgs.
MW-25A"
       sMW-2581
                                                                                                Figure  2.  Suggested
                                                                                                direct-push  locations

-------
ATTACHMENT A

-------
                                                            .,•*%* r"     '-  ,.



                                                   S!"X®        W
                                                     ''Lft  -  '   '   \         ',,:..!,
                                      ^L^^f»>^      W
                                   n&&^   *•"••? *        Bkl'B'-
                                     /.'••                      '•*,            >>
                      Waldameer    ..:::'.V-/      ^                   '•?.-->''*?&&   2>r^

                          %^^c'^      ''      \ -" S: Aj#":
                        .,::-J;':S^  \ : ^S^';:'       .^-:^;'' ^p>^< .%;"^
                      .••;"'?"  \v'K:<-:,  -,'^-Xft^ ^ •* Vivy^^Viib M«.ri*^AVx ^x
                          '.  ?&T'-f. -1  ^
                          ^^T Viil.i Mai-La .:;/,* \-y >

                          •  '•'••  \^*ftn1>' "•   \^T
                         < '  •   ^> *
                        •i •*-.'''"*"  • • « '.       «V*


                      ..-'  ..',.  •  i, \ "•.'-;"•• ••;. •





                             -v '«.kV * • ..- .^T --i
                                                    rr^^xr^fv- ^"^fr:
                                                    ££^ -v>\^ '    ^-t  '
                                                    ^:',.:^:-^\'       ^

                                                    ;\  ^^c*         ,-'
                                                     ...\r'".-"--^*1      --4^
                                                    -H\tv  •:        ,<-'•«&
                                                    "'•-'  ^xr    '.^  -v      v
                                                    ^ajroPj  i~.--'•'.•?. '.-- :y

                                                    -..j-**     ' [-1, Vj/      **"   • •" • •'' '* 4

                                                    ,     !":       •,>;;--.-^
g
  QUADRANGLE LOCATION
                       SCALE IN FEET
      4000 BASE MAP IS A PORTION OF THE U.S.G.S. 7.5

           MINUTE TOPOGRAPHIC SERIES SWANVILLE, PA

           QUADRANGLE. DATED: 1957, PHOTOREVISED 1990

           SCALE: 1" = 2000', CONTOUR INTERVAL IS 10

           FEET, NGVD 1929.
   CONRDENTIAL - ALL RIGHTS RESERVED - PROPERTY OF
00
32

K

8!
KK
GG
        PITTSBURGH, PENNSYLVANIA 15205
   2008 GROUNDWATER MONITORING REPORT

              SITE LOCATION  MAP

MILLCREEK DUMP NPL SITE	ERIE. PA
CUENTIPA DEPT. OF ENVIRONMENTAL PROTECTION I JOB NUMBER:41785924


SCALE:  AS SHOWN   LF;GWUBREER         1             "

-------
BASE MAP REFERENCE:
BASE MAP PLANIMETRICS (PROPERTY LINE AND TRENCHES) ARE TAKEN FROM
D'APPOLONIA DRAWING SHEET C-4, REV 6, "AS-BUILT" FINAL GRADE AND
WETLAND MITIGATION/ BORROW AREA PLAN, PA STATE PLANE NORTH  NAD83.
MONITORING WELLS WERE LOCATED USING M. BAKER CMS COORDINATE DATA.
COORDINATES WERE IN PA STATE  PLANE NORTH NAD27, AND TRANSLATED TO
PA STATE PLANE NORTH NAD83.

ORTHOPHOTO REFERENCE:
BASE IMAGE IS A COMPOSITE OF PORTIONS OF 71001310PAN.TIF AND
72001310PAN.TIF ORTHOPHOTOS, PROVIDED BY THE PAMAP PROGRAM 2005
ORTHOPHOTOS OF PENNSYLVANIA,  PADCNR. COORDINATE SYSTEM IS PA
STATE PLANE NORTH WITH A NAD83 DATUM.
                                 Pr
                              JL if
                              •^*W*»»-^' _., '
                                    I     " ~i Jtj
                              44~      tfft
                              -  -  -i    -«-, ^^

                                                                 CONFIDENTIAL - ALL RIGHTS RESERVED  - PROPERTY OF
                                                                            URS
                                                                           PITTSBURGH, PENNSYLVANIA
     2008 ANNUAL GROUNDWATER  MONITORING  REPORT
               SITE  AERIAL PHOTO - 300 SCALE
MILLCREEK DUMP NPL SITE
ERIE, PA
CLIENT: PA DEPT.  OF ENVIRONMENTAL PROTECTION | JOB NUMBER:  41785924
                                                                                                             SCALE:   AS SHOWN
                             FIGURE
                             NUMBER

-------
     BASE MAP REFERENCE:
     BASE MAP PLANIMETRICS WITHIN THE MAPPING LIMIT BOUNDARY ARE
     TAKEN FROM D'APPOLONIA DRAWING SHEET C-4, REV 6, "AS-BUILT"
     FINAL GRADE AND WETLAND MITIGATION/ BORROW AREA PLAN, PA STATE
     PLANE NORTH NAD83. PLANIMETRICS OUTSIDE THE MAPPING  LIMIT
     BOUNDARY WERE TRACED FROM THE ORTHOPHOTO REFERENCED BELOW.
     MONITORING WELLS WERE LOCATED USING M. BAKER CMS COORDINATE
     DATA. COORDINATES WERE IN PA STATE PLANE NORTH NAD27, AND
     TRANSLATED TO PA STATE PLANE NORTH NAD83.
     ORTHOPHOTO REFERENCE:
     BASE IMAGE IS A COMPOSITE OF PORTIONS OF 71001310PAN.TIF AND
     72001310PAN.TIF ORTHOPHOTOS, PROVIDED BY THE PAMAP PROGRAM
     2005 ORTHOPHOTOS OF PENNSYLVANIA, PADCNR.  COORDINATE SYSTEM
     IS PA STATE PLANE NORTH WITH A NAD83 DATUM.
                                                                                                                    MW-25B
00
32
1 1
51
DO
99
KK
GG
                                        CAPPING LIMIT_BOUNDARY_ __
                                                                                                 __,, _ 	
                                                                                                 ™/V-39A*MW-39B
                                    ±--^=22*
                                            ^      0
                                                                                                                                    2008 ANNUAL GROUNDWATER  MONITORING REPORT
                                                                                                                                                         SITE BASE MAP
CONFIDENTIAL - ALL RIGHTS  RESERVED -  PROPERTY OF
                                                                                          URS
                                                 MILLCREEK DUMP  NPL  SITE
                                                  CLIENT: PA DEPT. OF ENVIRONMENTAL  PROTECTION! JOB NUMBER:  41785924
                                                           MW-13-c, MW-24A
            PITTSBURGH, PENNSYLVANIA
                                                                                                                               SCALE:   AS  SHOWN

-------
     BASE MAP REFERENCE:
     BASE MAP PLANIMETRICS WITHIN THE MAPPING LIMIT BOUNDARY ARE
     TAKEN FROM D'APPOLONIA DRAWING SHEET C-4, REV 6, "AS-BUILT"
     FINAL GRADE AND WETLAND MITIGATION/ BORROW AREA PLAN, PA STATE
     PLANE NORTH NAD83. PLANIMETRICS OUTSIDE THE MAPPING LIMIT
     BOUNDARY WERE TRACED FROM THE ORTHOPHOTO REFERENCED  BELOW.
     MONITORING WELLS WERE LOCATED USING M. BAKER CMS COORDINATE
     DATA. COORDINATES WERE IN PA STATE PLANE NORTH NAD27, AND
     TRANSLATED TO PA STATE PLANE NORTH NAD83.
     ORTHOPHOTO REFERENCE:
     BASE IMAGE IS A COMPOSITE OF PORTIONS OF 71001310PAN.TIF AND
     72001310PAN.TIF ORTHOPHOTOS, PROVIDED BY THE PAMAP PROGRAM
     2005 ORTHOPHOTOS OF PENNSYLVANIA, PADCNR.  COORDINATE SYSTEM
     IS PA STATE PLANE NORTH WITH A NAD83 DATUM.
                     •"•">.
,  	 	 —#•	 	 	 MAPPING LIMIT BOUNDARY
:°OD     £'           '	'- 	
00
32
11
61
DO
99
KK
GG
                                  ;k-==«=>-=^
                                          ,^   0
                                                                                                                             2008 ANNUAL GROUNDWATER MONITORING REPORT
                                                                                                                          OCT. 2008 - A-ZONE (DEEP) POTENTIOMETRIC SURFACE MAP
                                                   CONFIDENTIAL - ALL RIGHTS RESERVED - PROPERTY OF
                                                                                      URS
                                                                                                  MILLCREEK  DUMP NPL  SITE
                                                                                                   CLIENT: PA  DEPT.  OF ENVIRONMENTAL PROTECTION| JOB NUMBER:  41785924
                                                                                     PITTSBURGH, PENNSYLVANIA

-------
BASE MAP REFERENCE:
BASE MAP PLANIMETRICS WITHIN THE MAPPING LIMIT BOUNDARY ARE
TAKEN FROM D'APPOLONIA DRAWING SHEET C-4, REV  6, "AS-BUILT"
FINAL GRADE AND WETLAND MITIGATION/ BORROW AREA PLAN, PA STATE
PLANE NORTH NAD83. PLANIMETRICS OUTSIDE THE MAPPING LIMIT
BOUNDARY WERE TRACED FROM THE ORTHOPHOTO REFERENCED BELOW.
MONITORING WELLS WERE LOCATED USING M. BAKER GMS COORDINATE
DATA. COORDINATES WERE IN PA STATE PLANE NORTH  NAD27, AND
TRANSLATED TO PA STATE PLANE NORTH NAD83.
QRTHOPHOTO REFERENCE:
BASE IMAGE IS A COMPOSITE OF PORTIONS OF 71001310PAN.TIF AND
72001310PAN.TIF ORTHOPHOTOS, PROVIDED BY THE PAMAP PROGRAM
2005 ORTHOPHOTOS OF PENNSYLVANIA, PADCNR.  COORDINATE SYSTEM
IS PA STATE PLANE NORTH WITH A NAD83 DATUM.
                                                                                                             MW-25B
                                                                                                               716.34



U MW-35
70.6.33 • .
\ f 	 j
'•O 	
"**•••••/

^MW-:
                                                                                                                                                            '-31
                                                 CD
                                  300
600
            /^—>,
                              SCALE IN FEET
                                                                       CONFIDENTIAL - ALL RIGHTS RESERVED  - PROPERTY OF
                                      URS
                                                                                   PITTSBURGH, PENNSYLVANIA
                                                                                                * y

                                                                                                ' ' •'•°»t> I
    2008 ANNUAL GROUNDWATER  MONITORING  REPORT
OCT. 2008  B-ZONE (SHALLOW)  POTENTIOMETRIC  SURFACE  MAP
                                                                                                                       MILLCREEK DUMP NPL SITE
                                                           ERIE, PA
                                                                                                                        CLIENT: PA  DEPT. OF  ENVIRONMENTAL  PROTECTION| JOB NUMBER:  41785924
                                                                                                                        SCALE:   AS  SHOWN
                                                                                                         FIGURE
                                                                                                         NUMBER
                                              6
REV
 0

-------
     BASE MAP REFERENCE:
     BASE MAP PLANIMETRICS WITHIN THE MAPPING LIMIT BOUNDARY ARE
     TAKEN FROM D'APPOLONIA DRAWING SHEET C-4, REV 6, "AS-BUILT"
     FINAL GRADE AND WETLAND MITIGATION/ BORROW AREA PLAN, PA STATE
     PLANE NORTH NAD83. PLANIMETRICS OUTSIDE THE MAPPING LIMIT
     BOUNDARY WERE TRACED FROM THE ORTHOPHOTO REFERENCED BELOW.
     MONITORING WELLS WERE LOCATED USING M. BAKER CMS COORDINATE
     DATA. COORDINATES WERE IN PA STATE PLANE NORTH NAD27, AND
     TRANSLATED TO PA STATE PLANE NORTH NAD83.
     ORTHOPHOTO REFERENCE:
     BASE IMAGE IS A COMPOSITE OF PORTIONS OF 71001310PAN.TIF AND
     72001310PAN.TIF ORTHOPHOTOS, PROVIDED BY THE PAMAP PROGRAM
     2005 ORTHOPHOTOS OF PENNSYLVANIA, PADCNR. COORDINATE SYSTEM
     IS PA STATE PLANE NORTH WITH A NAD83 DATUM.
                     •"•">.
       5-
       »v '
,  	 	 —#•	 	 	 MAPPING LIMIT BOUNDARY
:°OD     £'           '	'- 	
00
32
11
51
DO
99
KK
GG
                                  ;k-==«=>-=^
                                          ^     0
                                                                                                                               2008  ANNUAL  GROUNDWATER MONITORING REPORT
                                                                                                                          OCT.  2008-A-ZONE  (DEEP) TOTAL  VOCs ISOCONCENTRATION MAP
                                                    CONFIDENTIAL - ALL RIGHTS  RESERVED - PROPERTY OF
                                                                                       URS
                                                                                                   MILLCREEK DUMP NPL SITE
                                                                                                    CLIENT: PA  DEPT. OF  ENVIRONMENTAL PROTECTION| JOB NUMBER:  41785924
                                                                                      PITTSBURGH, PENNSYLVANIA

-------
                                                                                                                  MW-25B
     BASE MAP REFERENCE:
     BASE MAP PLANIMETRICS WITHIN THE MAPPING LIMIT BOUNDARY ARE
     TAKEN FROM D'APPOLONIA DRAWING SHEET C-4, REV 6, "AS-BUILT"
     FINAL GRADE AND WETLAND MITIGATION/ BORROW AREA PLAN, PA STATE
     PLANE NORTH NAD83. PLANIMETRICS OUTSIDE THE MAPPING LIMIT
     BOUNDARY WERE TRACED FROM THE ORTHOPHOTO REFERENCED  BELOW.
     MONITORING WELLS WERE LOCATED USING M. BAKER GMS COORDINATE
     DATA. COORDINATES WERE IN PA STATE PLANE NORTH NAD27, AND
     TRANSLATED TO PA STATE PLANE NORTH NAD83.
     QRTHOPHOTO REFERENCE:
     BASE IMAGE IS A COMPOSITE OF PORTIONS OF 71001310PAN.TIF AND
     72001310PAN.TIF ORTHOPHOTOS, PROVIDED BY THE PAMAP PROGRAM
     2005 ORTHOPHOTOS OF PENNSYLVANIA, PADCNR. COORDINATE SYSTEM
     IS PA STATE PLANE NORTH WITH A NAD83 DATUM.
00
32
1 1
5 1
DO
99
KK
GG
                                                                            CONFIDENTIAL - ALL RIGHTS RESERVED -  PROPERTY OF
                                                                                         URS
                                                                                       PITTSBURGH, PENNSYLVANIA
     2008 ANNUAL GROUNDWATER  MONITORING  REPORT
 OCT. 2008 B-ZONE  (SHALLOW) TOTAL VOCs ISOCONCENTRATION MAP
MILLCREEK  DUMP NPL  SITE
              ERIE, PA
CLIENT: PA  DEPT.  OF ENVIRONMENTAL PROTECTION| JOB NUMBER:  41785924
                                                                                                                            SCALE:   AS SHOWN
                                FIGURE
                                NUMBER
8
REV
 0

-------