Potential for Future Use
East Chicago Industrial Property
5300 Kennedy Avenue, East Chicago, Indiana 46312
Site Name: U.S. Smelter & Lead Refinery Superfund Site
Size: 79 acres
Supported Site Uses: Industrial (TBD)
Existing Site Infrastructure: All major utilities are available in
local area.
Readiness for Use: Ready now: About 40 acres should be ready
for reuse. This area was either cleaned up under the RCRA order or
required no action.
Ready in the future: The 14-acre Corrective Action Management Unit
(CAMU) needs a RCRA post-closure permit. Upon completion of the
permit, the CAMU may be available for some limited reuse.
Not likely for reuse: About 25 acres of the site consist of wetlands.
East Chicago, Indiana
Site is located in an industrialized
section of southern East
Chicago, Indiana adjacent to
U.S. Interstate 80/90.
SETTING:
• The site and surrounding properties are zoned
for industrial land uses. Adjacent active land
uses include a large chemical factory and a
tank farm.
• The site is bordered by the Industrial Harbor
Belt Railroad to the north, U.S. Interstate
80/90 to the south, Kennedy Avenue to the
east, and the Indiana Harbor Canal to the
west.
• Surrounding population: 0.5 mile, 2,571
people; 2.5 miles, 70,346 people; 4 miles,
108,935 people.
EPA Region 5 Reuse Fact Sheets
REMEDIAL STATUS:
• The site was proposed to the National Priorities List in February
1992.
• The site currently has a Consent Order with the RCRA program.
A CAMU was constructed on about 14 acres, and will require
long-term operations and maintenance. Wetlands exist on a
portion of the site and maybe of interest to the natural resource
trustees. Future Superfund investigations will be coordinated
with the RCRA authorities.
FOR MORE INFORMATION, PLEASE CONTACT:
EPA Region 5:
Michael Berkoff
Remedial Project Manager
77 West Jackson Blvd.
Chicago, Illinois 60604-3507
Phone: (312) 353-8983
Email: berko ff.michael(g).ep a.gov
Site Summary: www.epa.gov/
region5superfund/npl/indiana/IND047030226.
htm
August 200,
------- |