Verification Test Plan
                    for
         Hydro International, Inc.

Up-Flo™ Filter for Stormwater Treatment
                 Prepared for
               NSF International
             Ann Arbor, Michigan
                    And
The Environmental Technology Verification Program
                    of the
      US Environmental Protection Agency
              Edison, New Jersey
                     By

             Penn State Harrisburg
           Middletown, Pennsylvania
                February 2006

-------
                                 Signature Page

                              Verification Test Plan
                                        for
                            Hydro International, Inc.

                   Up-Flo™ Filter for Stormwater Treatment
                                   February 2006

                                        For

              EPA/NSF Environmental Technology Verification Program
                          Water Quality Protection Center
Original signed by
Lisa Glennon
Lisa Glennon
Hydro International
94 Hutchins Drive
Portland, Maine 04102
207-756-6200
Original signed by
Thomas Stevens
Thomas Stevens
Manager, Water Quality Protection Center
NSF International
789 N. Dixboro Road
Ann Arbor, Michigan 48105
734-769-5347
Original signed by
Shirley Clark
Shirley Clark, P.E., Ph.D.
The Pennsylvania State University -
Harrisburg
777 W. Harrisburg Pike
Middletown, Pennsylvania  17057
717948-6127

Original signed by
RayM. Frederick
Raymond Frederick
Project Officer
Water Quality Protection Center
U.S. Environmental Protection Agency
NRMRL
2890 Woodbridge Ave. (MS-104)
Edison, New Jersey 08837
732-321-6627

-------
                                       Contents

Signature Page	i
Contents	ii
Figures	iv
Tables	iv
Abbreviations and Acronyms	v
Chapter 1 Introduction and Objectives	1
1.1    Introduction	1
1.2    Objectives	1
Chapter 2 Verification Testing Responsibilities	3
2.1    EPA	3
2.2    NSF - Verification Organization	3
2.3    PSH - Testing Organization	4
2.4    Technology Vendor	5
2.5    ETV Test Site	6
Chapter 3 Description of the Up-Flo™ Filter System	7
3.1    Technology Overview	7
       3.1.1  Up-Flo™ Filter Components	7
3.2    Hydraulic Flow Path	8
3.3    Flow Conditions	8
       3.3.1  Operating Flow Conditions	8
       3.3.2  Bypass Flow Conditions	9
       3.3.3  Drain Down	10
3.4    Sizing and Hydraulic Capacity	10
3.5    Test Unit Specifications and Test Setup Description	11
3.6    Up-Flo™ Filter Capabilities and Claims	14
       3.6.1  System Capability	14
       3.6.2  Vendor Claims	15
3.7    Performance Measures for the Verification Test	16
       3.7.1  Contaminant Selection and Monitoring for Performance	16
       3.7.2  System Component Operation and Maintenance Performance	16
       3.7.3  Quantification of Residuals	17
Chapter 4 Experimental Design	18
4.1    Introduction	18
4.2    Test Site and Setup	18
4.3    Test Phases -Hydraulic Loading	20
       4.3.1  Phase I - Performance under Intermittent Flow Conditions	21
       4.3.2  Phase II - Determination of the Capacity of the Unit	23
       4.3.3  Phase III Performance Under Varied Hydraulic and Concentration Conditions.. 24
       4.3.4  Phase IV: Contaminant Capacities at High Hydraulic Throughput	26
4.4    Influent Characterization	27
       4.4.1  Synthetic Challenge Water	27
       4.4.2  Stock Solutions	29
       4.4.3  Influent Characterization during the Verification Testing	29
                                           11

-------
       4.4.4  Solids Characterization during the Verification Testing	30
4.5    Effluent Characterization	30
4.6    Residue Management	30
4.7    Operation and Maintenance Observations	31
Chapters Sampling and Analysis Plan	33
5.1    Sampling Locations	33
5.2    Sampling Frequency	33
5.3    Sample Collection, Preservation, and Storage	34
5.4    Chain of Custody	35
5.5    Analytical Methods	35
Chapter 6 Quality Assurance and Quality Control -Project Plan	37
6.1    Verification Test Data - Data Quality Indicators (DQIs)	37
       6.1.1  Precision	37
       6.1.2  Accuracy	38
       6.1.3  Comparability	38
       6.1.4  Representativeness	39
       6.1.5  Completeness	39
6.2    Project Management	40
       6.2.1  Management Team	40
       6.2.2  Project Description and Objectives	40
       6.2.3  Project Schedule	41
6.3    Measurements and Data Acquisition	41
       6.3.1  Sample Collection and Chain of Custody	41
       6.3.2  Analytical Methods	42
       6.3.3  Analytical Quality Control	42
       6.3.4  Data Reduction, Handling, and Reporting	45
6.4    Assessments	47
6.5    Corrective Action	47
Chapter 7 Data Management and Analysis	49
7.1    Data Management	49
       7.1.1  Manual Data Collection	49
       7.1.2  Electronic Data Collection	50
7.2    Data Analysis and Presentation	50
       7.2.1  Flow Data	50
       7.2.2  Treatment Performance Quality Data	50
       7.2.3  Operations and Maintenance Parameters	51
       7.2.4  Equations	51
7.3    Verification Report	51
References	53
Glossary	54
Appendices	56
A     Up-Flo™ Filter O & M Manual	56
B     Chain of Custody Form	56
                                          in

-------
                                        Figures

Figure 3-1. Up-Flo™ Filter components	7
Figure 3-2. Filter module components	8
Figure 3-3. Flow path during normal operating conditions	9
Figure 3-4. Flow path during bypass flow conditions	9
Figure 3-5. Flow path during drain down conditions	10
Figure 3-6. Bypass water levels for standard Up-Flo™ Filter (left) and shallow Up-Flo™ Filter.
     	11
Figure 3-7. Up-Flo™ Filter test unit isometric view	12
Figure 3-8. Up-Flo™ Filter test unit plan view	12
Figure 3-9. Section view of Up-Flo™ Filter test unit	13
Figure 3-10. Process schematic of test system setup	14
Figure 4-1. Sediment particle size distribution graph	20
                                        Tables

Table 4-1. Particle Size Distribution	19
Table 4-2. Revised Synthetic Challenge Water Concentrations	28
Table 4-3. Synthetic Challenge Water Mix Stock Concentrations	28
Table 5-1. Sampling Locations, Frequency, Type, and Analysis	33
Table 5-2. Bottle Type, Preservation, and Sample Size by Analysis	35
Table 5-3. Analytical Methods	36
                                           IV

-------
                          Abbreviations and Acronyms
ASTM
°C
COD
DQI
EPA
ETV
ft2
g
gal
gpm
HOPE
Kg
L
Lb
MDL
NRMRL
NPDES
NURP
mg/L
mL
NSF
NIST
O&M
P
PM
QA
QC
RP
RPD
SOP
ssc
TCLP
TP
TO
TSS
VO
WQPC
American Society for Testing and Materials
Celsius degrees
Chemical oxygen demand
Data Quality Indicators
U.S. Environmental Protection Agency
Environmental Technology Verification
Square foot (feet)
Gram
Gallons
Gallon(s) per minute
High-density polyethylene
Kilogram(s)
Liters
Pounds
Minimum Detection Level
National Risk Management Research Laboratory
National Pollutant Discharge Elimination System
National Urban Runoff Program
Microgram per liter (ppb)
Milligram per liter
Milliliter
NSF International, formerly known as National Sanitation Foundation
National Institute of Standards and Technology
Operations and Maintenance
Phosphorus
Project Manager for the Testing Organization (TO)
Quality assurance
Quality control
Reactive phosphorus
Relative Percent Difference
Standard Operating Procedure
Suspended sediment concentration
Toxicity Characteristic Leaching Procedure
Total phosphorus
Testing Organization
Total suspended solids
Verification Organization (NSF)
Water Quality Protection Center

-------
                                      Chapter 1
                            Introduction and Objectives
1.1    Introduction
This document contains the technology specific test plan to be used for the verification testing of
the Hydro International Up-Flo™ Filter for challenge water treatment. The Up-Flo™ Filter is a
patented up-flow filter that  includes sediment  containment,  filtration  media, and overflow
protection through a bypass siphon. The unit is designed for use in catch basins as an in-drain or
in-line treatment technology.  This test plan has been prepared  in accordance with the Protocol
for the Verification of In-Drain Treatment Technologies (April 2001) (protocol) developed under
the United  States  Environmental  Protection Agency  (EPA)  Environmental Technologies
Verification (ETV) program's Water Quality Protection Center (WQPC).

The ETV Program is intended to:
   •   Evaluate  the performance  of innovative and  commercially available  environmental
       technologies;
   •   Provide permit writers, buyers and users, among others, with objective information about
       technology performance; and,
   •   Facilitate "real world" implementation of promising technologies.

The ETV program  has developed verification testing protocols  that are intended to serve  as
templates for conducting verification tests for various technologies. The protocol was published
as the guidance document for test plan development for verification testing of in-drain treatment
units used in challenge water collection systems. This test plan  was developed in accordance
with the guidance document. The goal of the verification testing process is to generate high
quality data for verification of equipment performance.

NSF International (NSF) oversees the verification testing pilot  project  for in-drain treatment
technologies under the sponsorship of the EPA  Urban Watershed Branch,  Water Supply and
Resources Division.  The role of NSF is to  provide technical and administrative leadership in
conducting the testing.

It is  important to note  that verification of the equipment does  not mean that the equipment is
"certified" or "approved" by NSF or EPA. Instead, the verification  testing  pilot projects are a
formal mechanism by  which the performance of equipment can be determined by  these two
agencies, and which can result in the issuance of a verification report by NSF and EPA.

1.2    Objectives

Hydro International, pic (Hydro International) manufactures the Up-Flo™  Filter,  a  high rate,
modular filtration system designed to remove floatables, gross debris,  and suspended sediment
and associated pollutants from challenge water runoff. The Up-Flo™ Filter is intended for use as
an in-line or in-drain  technology. The treatment unit that will  be  tested in this verification

-------
program is a full scale, commercially available unit. This unit will be tested for its sediment and
phosphorus removal efficiency from simulated challenge water runoff.

Verification testing of in-drain treatment systems under the ETV WQPC is designed to verify the
contaminant treatment capabilities and operational and maintenance procedures of commercial-
ready systems, following sound  protocols and appropriate quality assurance  and control. A
primary objective  of the ETV is  to measure the  performance of these technologies through a
well-defined test plan that includes measurement of various contaminants, typically present in
maintenance areas, parking lots, gasoline stations, truck stops and the "first flush" from challenge
water, before and after application of the treatment technology.

The objective  of this test plan is to determine the performance that is attained by the Up-Flo™
Filter when used to treat water containing a variety of solid materials and paniculate phosphorus.
Reduction in contaminant loads will be evaluated to determine the effectiveness of the system to
remove suspended solids,  solids in  particular  size  ranges,  as well  as total  and  reactive
phosphorus.

The objective will be achieved by implementing testing procedures presented in this test plan. A
synthesized challenge water containing solids and particulate phosphorus will be prepared. This
challenge mixture will include hydrocarbon concentrations in the range of typical urban runoff.
Detergent ingredients will be added in concentrations typical of drain water since no data on
detergent concentrations in stormwater are available.  The treatment system will be challenged
under a variety of hydraulic loading conditions  and contaminate loads. Influent and effluent
samples from the unit will be measured for various contaminants as determined by indicator and
chemical tests (total suspended solids,  suspended  sediment concentration, total phosphorus, and
reactive phosphorus).  The  results will be  used  to  calculate removal  efficiencies,  system
capacities, and to determine the system treatment effectiveness.

The treatment system will  also be monitored for  operation and maintenance characteristics,
including the performance and reliability of the equipment  and the level of operator maintenance
required. Data will be collected on the generation of residues.  At the end of each test period,
solids accumulated in the sump of the unit will be collected and measured.  The filtration media
will also be changed at the end of certain phases of testing and will be measured for weight and
volume.

-------
                                     Chapter 2
                       Verification Testing Responsibilities

EPA  sponsors  the  ETV  Program, which  is  implemented  through contracted  verification
organizations (VOs).  NSF is the VO for the WQPC. The VO is responsible to provide oversight
for the testing program and for selection of the Testing Organization (TO) for each technology to
be verified. NSF reviews all test plans and oversees all of the participants in the testing program
to ensure there is no bias or conflict of interest that could influence the test results. Penn State
Harrisburg will act as the TO. NSF will provide oversight and review of the testing operation, as
required under the audit program requirements outlined in the test plan and contract documents.

2.1   EPA

The EPA  Office of Research and Development through the Urban  Watershed Branch,  Water
Supply  and Water  Resources  Division,  National Risk  Management Research Laboratory
(NRMRL) provides  administrative,  technical, and quality assurance guidance and oversight on
all ETV WQPC activities.  The EPA will review and  approve each phase of the verification
project.  The EPA's responsibilities will include:

      •   Test plan review and approval;
      •   Verification report review and approval; and
      •   Verification statement review and  approval.

The key EPA contact for this program is:

      Mr. Ray Frederick, Project Officer
      (732) 321-6627   email: Frederick.Ray@epa.gov

      EPA, NRMRL
      Urban Watershed Management Research Laboratory
      2890 Woodbridge Ave. (MS-104)
      Edison, NJ 08837-3679

2.2   NSF - Verification Organization

The ETV WQPC  is administered through a  cooperative agreement between EPA and NSF its
verification partner  organization.   NSF  administers the  WQPC, and the development and
implementation  of the test plan.

NSF's responsibilities as the VO include:

      •   Review and comment on the test plan;
      •   Coordinate with peer-reviewers to review and comment on  the test plan;

-------
       •  Coordinate with the EPA Program Manager and the technology vendor to approve the
          test plan prior to the initiation of verification testing;
       •  Review the quality systems of all parties involved with the TO  and subsequently,
          qualify the TO;
       •  Oversee the technology evaluation and associated laboratory testing;
       •  Carry out an on-site audit of test procedures;
       •  Oversee the development of a verification report and verification statement;
       •  Coordinate with EPA to approve the verification report and verification statement;
       •  Provide QA/QC review and support for the TO.

Key contacts at NSF are:

       Mr. Thomas Stevens, Program Manager
       (734) 769-5347    email: Stevenst@nsf.org

       Mr. Patrick Davison, Project Coordinator
       (734)913-5719    email: Davison@nsf.org

       NSF International
       789 Dixboro Road
       Ann Arbor, Michigan 48105

2.3    PSH - Testing Organization

The TO for the verification testing is the Environmental Engineering Program at Penn State
Harrisburg (PSH).  The PSH physical laboratory has the space and large-scale equipment (tanks,
pumps, etc.) to perform the testing on the Up-Flo™ Filter unit, and the PSH chemical laboratory
has the equipment and experience to perform the analytical work for this test plan.

Dr. Shirley Clark will be the Project Manager (PM) for the TO and will be responsible for the
successful completion of the verification project. Dr. Clark will have responsibility for obtaining
all  of the information needed to plan and execute  the test plan, managing  the data collected
during the test period, overseeing the preparation of the draft verification report, and providing
technical guidance. Dr. Clark and her team also will prepare the test plan and draft verification
report.

PSH will provide the laboratory services  for the testing program.  PSH will be responsible for all
quality assurance for the test plan through its QA protocols and test-specific procedures.  NSF
will provide administrative and technical support for review of the test plan and the Final Report.
The QA and data reports prepared  by PSH will be reviewed by the  NSF QA group or their
designee. The laboratory is familiar with EPA QA requirements and performs many projects to
EPA QA specifications.

-------
The TO's responsibilities include:

       •  Preparing the test plan;
       •  Conducting testing according to the test plan;
       •  Installation, operation, and maintenance of the Up-Flo™ Filter unit in accordance
          with the vendor's O&M manual(s);
       •  Controlling access to the area where verification testing is being carried out;
       •  Maintaining safe conditions at the test site for the health and safety of all personnel
          involved with verification testing;
       •  Scheduling and coordinating the activities of all verification testing  participants,
          including  establishing  a communication network and providing  logistical  and
          technical support;
       •  Resolving any quality concerns that may be encountered and report all findings to the
          VO;
       •  Managing, evaluating, interpreting and reporting  on data generated by verification
          testing;
       •  Evaluation and reporting on the performance of the technology; and,
       •  If necessary, document changes in plans for testing and  analysis, and notify the VO of
          any and all such changes before changes are executed.

The key personnel and contacts for the TO are:

       Dr. Shirley E. Clark
       Assistant Professor of Environmental Engineering
       (717) 948-6127    email: seclark@psu.edu

       PSH Environmental Engineering
       777 W. Harrisburg Pike
       Science & Technology Building
       Middletown, PA 17057

2.4    Technology Vendor

The Up-Flo™ Filter is manufactured and distributed by Hydro International. The vendor will be
responsible  for supplying the  equipment needed for the test plan and will support  the TO in
ensuring that the equipment is properly installed and operated during the verification test period.
Specific responsibilities of the vendor include:

-------
       •  Initiate application for ETV testing;
       •  Provide input to the verification testing objectives to be incorporated into the test
          plan;
       •  Provide complete ready to operate equipment, and the operations and maintenance
          (O&M) manual(s) typically provided with the technology (including instructions on
          installation, start-up, operation and maintenance) for verification testing;
       •  Provide any existing relevant  performance data for the technology if it has been
          tested/operated at other locations;
       •  Provide logistical and technical support as required;
       •  Provide assistance  to the TO  on the operation and monitoring  of  the Technology
          during the verification testing;
       •  Review and approve the test plan;
       •  Review and comment on the verification report; and
       •  Provide funding for verification testing.

The key contacts for  Hydro International will be:

       Dr. Robert Andoh, Group Technical Director
       (207) 756-6200    email: bandoh@hil-tech.com

       Ms. Lisa Glennon, Research and Development Manager
       (207) 756-6200   email: lglennon@hil-tech.com

       Hydro International
       94 Hutchins Drive
       Portland, ME 04102

2.5    ETV Test Site

The verification test  will be performed at the Penn State Harrisburg Environmental Engineering
laboratories.  The physical laboratory will be the location of the test setup and  operation of the
Up-Flo™ Filter.  This laboratory group will be responsible for record keeping and providing
information on activities that may affect the characterization and verification test results.  These
responsibilities include:

       •  Provide space and utilities for the test setup;
       •  Provide equipment,  piping, pumps, valves, flow meters, tanks, etc.  needed to setup
          the test and run water to the Up-Flo™ Filter unit;
       •  Install  the equipment and wet test the system to ensure the system is operational;
       •  Perform the testing  of the equipment in accordance with the test plan;
       •  Collect samples and record flow rates for each phase of testing; and
       •  Maintain  records and information on the operation of the unit.

-------
                                      Chapter 3
                    Description of the Up-Flo™ Filter System

3.1    Technology Overview

The Up-Flo™ Filter is a passive, modular filtration system that incorporates multiple elements of
a treatment train into  a single, small-footprint device. The Up-Flo™ Filter uses a sedimentation
sump and screening system to pretreat runoff before it flows up through the filter media where
final polishing occurs.  A high-capacity, siphonic bypass safeguards against upstream ponding
during high-flow events.  The siphon also serves as a floatables baffle to  prevent the escape of
floatable trash and debris from the Up-Flo™ Filter chamber.

3.1.1   Up-Flo™ Filter Components

The Up-Flo™ Filter has no moving parts and no external power requirements. It consists of a
cylindrical concrete vessel with plastic internal components and a stainless steel support frame.
The concrete vessel is a standard cylindrical manhole with an inlet pipe or a grate opening.  An
inspection port at ground level provides access to the sump for sediment removal.  The internal
components consist of angled stainless steel screens, wedge-shaped Filter Modules, a bypass
siphon with a floatables baffle, and an Outlet Module.  The base of the Outlet Module is
equipped with a Drain-Down Port design that enables standing water  to drain out of the filter
media between  storm events, preventing the re-release of captured pollutants. The Up-Flo™
Filter components are shown in Figure 3-1.
Bypass Siphon/
Floatables Baffle
Support Brackets
Sump
                                                            Inlet Grate/
                                                            Maintenance Access
Outlet Module
                                                            Filter Module
Angled Screen

•Drain-Down    Port
(not seen  from  this
view)
Figure 3-1. Up-Flo™ Filter components.

-------
  The Filter Module houses the Media Pack. The Media Pack consists of two (2) filter media bags
  and two (2) layers of flow distributing media. The internal components of the Filter Module are
  shown in Figure 3-2.
Filter Module Lid
Conveyance
Channel
Filter Module
Support Brackets
                                                                        Media Restraint
                                                                        Media Pack
                                                                        Angled Screen
 Figure 3-2. Filter module components.
 3.2    Hydraulic Flow Path

 The Up-Flo™ Filter is self-activating and operates on simple fluid hydraulics. The configuration
 of the internal  components  directs the flow in a pre-determined path through the vessel as
 described below.

 3.3    Flow Conditions

 3.3.1   Operating Flow Conditions

 Challenge water enters the chamber from an inlet pipe or an overhead grate and flows into the
 sump region where gross debris and coarse grit are removed by settling. Runoff continues to fill
 the chamber until there is enough driving head to initiate flow through the filter media.  At this
 point, the water flows up through the Angled Screen into the Filter Module.  In the module, flow
 passes up  through  the  filter media and is conveyed  to the  Outlet Module  via  the Flow
 Conveyance Channel.  The flow path through the Up-Flo™ Filter during normal operating
 conditions is illustrated in Figure 3-3.

-------
Figure 3-3.  Flow path during normal operating conditions.

3.3.2   Bypass Flow Conditions

Flows in excess of the filtration capacity are discharged  directly to the outlet module by the
siphonic bypass. The siphon also serves as a floatables baffle to prevent the escape of buoyant
litter and debris.  The flow path through the Up-Flo™ Filter during bypass flow conditions  is
shown below in Figure 3-4.
Figure 3-4.  Flow path during bypass flow conditions.

-------
3.3.3   Drain Down

Filter media continuously submerged in water can become anoxic,  producing an environment
that promotes bacterial growth and the release of other harmful leachates. The Up-Flo™ Filter
has been designed with a drain-down mechanism to ensure that the filter media sits above the
standing water level between storm events.  As a storm event subsides, water slowly drains out
of the chamber through the Drain-Down Port located at the base of the outlet module.  The
Drain-Down Ports are covered with a layer of filter fabric to provide treatment to the drain-down
flows.  The flow path for the drain down mechanism is shown in Figure 3-5.
Figure 3-5. Flow path during drain down conditions.

3.4    Sizing and Hydraulic Capacity

The Up-Flo™ Filter is sized to treat the peak treatment flow of a water quality design storm.
The peak flow is determined from calculations based on the contributing watershed hydrology
and from a design storm magnitude set by the local challenge water management agency.  The
number of Filter Modules included in an Up-Flo™ Filter  is determined by the peak treatment
flow.

The flow rate through each filter module depends on the  nature and type  of media within the
module and the water level in the Up-Flo™ Filter chamber.  By adjusting media blends, each
Filter Module can be  engineered to have a range of treatment flow rates  from 10 gpm to an
excess of 25  gpm.   The flow rate through each Filter Module will determine the number of
modules needed to treat the peak treatment flow of the storm event.

The Up-Flo™ Filter is equipped with a Bypass Siphon designed to discharge flows in excess of
the treatment flow.  When influent flows exceed the filtration capacity, the water level in the
                                          10

-------
Up-Flo™ Filter chamber rises until it reaches the height of the internal weir of the siphon. Once
water starts to flow over the weir, the Bypass Siphon begins drawing water out of the chamber
discharging the excess flows through the Outlet Module to the outlet pipe.

The  height  of the  bypass can be adjusted to accommodate shallow retrofits or restrictive
hydraulic profiles.  The standard Up-Flo™ Filter bypasses in excess of 7 cfs with 2.5 feet of
hydraulic drop. A shallow unit, depicted in Figure 3-6, has a bypass capacity in  excess of 4 cfs
with a significantly reduced hydraulic drop.
Figure 3-6. Bypass water levels for standard Up-Flo™ Filter (left) and shallow Up-Flo™
Filter.

3.5    Test Unit Specifications and Test Setup Description

The unit to be tested is a full scale, commercially available Catch Basin system. For the standard
Catch Basin configuration, the Up-Flo™ Filter is comprised of one to six Filter Modules.  In
normal business practice, the number of Filter Modules included in an Up-Flo™ Filter system is
dependent upon the required peak treatment flow rate.  It  is important to characterize the Up-
Flo™ Filter on a per-Module basis because it is sized on a  per-Module basis. TSS, Phosphorus
and Hydraulic Capacity performance claims will be verified on a one-module Catch Basin Up-
Flo™ Filter setup.   Sizing claims will be verified  by benchmarking the hydraulic capacity of a
two-module set up to the capacity of the one-module set-up.  The two-module Catch Basin Up-
Flo™ Filter set up is shown in Figure 3-7, Figure 3-8, and Figure 3-9.
                                           11

-------
                                                                 ....
Up-Flo™ Filter Test Tank
Viewing/Clean Out Port          •

Sump	
   Bypass Siphon/
   Floatables Baffle

   Outlet Module

   Outlet Pipe

   Filter Module

   Support Brackets
   with Legs
Figure 3-7.  Up-Flo™ Filter test unit isometric view.

The test unit has a 24-inch sump depth, a 12-inch outlet, and an 18-inch acrylic viewing port.
The height of the bypass is set so that there can be 21 inches of driving head acting on the
Up-Flo™ Filter before bypass levels are reached.  The test tank will be set up such that inflows
pour into the chamber through the open top, replicating a grated-inlet field installation.
Up-Flo™
Filter test tank
Viewing/Clean
Out port
  Sump
Filter Module
                                                                   Bypass Siphon/
                                                                   Floatables Baffle
 Outlet Pipe
   Support
   Bracket Legs
Figure 3-8.  Up-Flo™ Filter test unit plan view.
                                          12

-------
Up-Flo™ Filter Test
Tank
Filter Module
Viewing/Clean Out Port	•
Sump
Bypass Siphon/
Floatables Baffle
Outlet Module


Outlet Pipe

Support/Legs

Angled Screen
Figure 3-9.  Section view of Up-Flo™ Filter test unit.

The tests will be performed at PSH's Environmental Engineering physical testing laboratory.
The PSH laboratory is set up to handle testing of this type with physical facilities that includes a
water supply up to 50 gpm, tanks, mixers, and pumps to store and feed the synthetic water, and
all other associated piping, controls and related equipment. The Up-Flo™ Filter is a passive unit
that does not require any utility connections to operate.  Therefore, there will be no electrical
requirements needed for operation of the unit. There will be water and electrical needs for the
laboratory to supply the synthetic test water to the unit, operate pumps, mixers, and sampling
equipment, etc. However, none of these requirements would be needed in a field application.
There will be no special permitting needed to operate the unit or the test facility equipment for
this verification.

The synthetic challenge water described later in this test plan will contain simulated challenge
water solids and a source of particulate phosphorus (as described later in this plan). The levels of
these  contaminants  in  the synthetic  water will  be similar to those  found in challenge  water
runoff, based on data generated both during the Nationwide Urban Runoff Program (NURP) and
the more-recent analysis of outfall data. While it is anticipated that  all the effluent water will
meet the requirements  of both the sanitary pre-treatment program and the NPDES permit, it is
planned that this water will be captured in a holding area and the solids allowed more time to
settle. The solids that accumulate will be solid waste that require disposal during the test. Based
on the manufacturer's data and general information regarding the contaminants that most  likely
will be removed and present in the residues, these solids wastes should be acceptable for disposal
in a standard municipal landfill. The residues will be tested prior to disposal to ensure they are
not regulated materials that require special disposal. In addition, a carbon filter will be used to
treat the discharge water after  the effluent settling tank to ensure that the organic pollutants are
                                           13

-------
removed to acceptable levels prior to discharge to either the storm drain system or the sanitary
sewer system.

The unit will be installed at the PSH water/wastewater laboratory such that water will enter and
exit the  unit by gravity  as  would occur in a typical field installation. Figure  3-10 shows a
schematic process flow diagram for the test setup at the laboratory.

      Synthesized
     Contaminants
     Two (2) Tanks
Soil Dry Feeder
                                           Open Channel


<
L




Influent _l_
7*
\


Clean
Water
X
T
Influent
Sampling Point


	 1 	


Up-Flo™
Filter and
test catch
basin








( FE J Effluent
\.^/
T Effluent
X
Effluent Sampling
Point
Figure 3-10. Process schematic of test system setup.
3.6    Up-Flo™ Filter Capabilities and Claims

3.6.1   System Capability

The  Up-Flo™  Filter  is a  compact  treatment-train  device  that  targets  the wide  range of
constituents typically  found in challenge water runoff.   Each Up-Flo™ Filter includes a
sedimentation sump, coarse  screens and filtration media.  Coarse grit and gross debris will be
removed by settling in the sump, neutrally buoyant debris will be removed by screening, and fine
suspended sediment will be removed by filtration.  The filter media may be customized to target
other site-specific pollutants  such as nutrients, metals and organics.

Two filter  media will  be  used in this verification  program.   The first media will be Hydro
International's CPZ Mix™, which is made up of activated carbon, manganese-coated zeolite and
peat.  Granular activated carbon  is a traditional filter media for targeting organic chemicals,
pesticides and herbicides.   The manganese-coated  zeolite targets TSS, iron, manganese and
ammonium in challenge water runoff.  The small fraction of peat targets the removal of organics
                                           14

-------
and metals.  The second media to be tested will be Filpro® 0.35 grade filter sand. Filpro® 0.35 is
a commercially available grade of filter sand that is certified by NSF International under NSF
Standard 61 and is sized and graded to meet the specifications of AWWA B-100 and the ANSI
standards for consistently uniform and chemically inert filter media.  The filter sand targets the
removal of TSS and associate pollutants such as particle-bound phosphorus.

Each Filter Module with the CPZ Mix™ will have a flow rate of 20-25 gpm when the water level
in the chamber provides 20 inches of driving head.  Each module with filter sand will pass 18 to
20 gpm  under 20 inches  of driving head.   The filtration rate will decrease as driving head
decreases.  Filtration will occur until the driving head in the chamber falls to zero inches.  When
the  inflows exceed the filtration capacity, the excess flows will discharge through the Bypass
Siphon directly to the outlet module.  The Bypass has been designed to accommodate 7 cfs of
excess flows.  This high-capacity Bypass Siphon ensures that head-loss and flow-restrictions due
to the filter media will not cause collection system backups and ponding on the surface during
events with high flow rates.

Maintenance of the sump and replacement of the filter bags is important for the successful long-
term operation of the Up-Flo™ Filter.  The filtration rate of the  Up-Flo™ Filter will decrease as
captured pollutants accumulate in the filtration media. The filter bags should be replaced once a
year (or as needed) to ensure that fine  sediment build up is not  allowed to accumulate  such that
the flow rate of the filter will be significantly reduced.  Sediment and gross debris must also be
periodically removed from the sump to ensure that accumulated sediment does not block the
intake of the Filter Module.

This test plan is designed to meet the basic protocol requirements and will focus on the treatment
capability of the unit to remove sediment and particulate phosphorus from synthetic challenge
water.   The experimental  design and sampling  and analysis plan presented in the following
sections provide  details on the test protocol and the constituents targeted for this verification.

3.6.2   Vendor Claims

The Up-Flo™ Filter is designed to incorporate  multiple elements of a  treatment train  into  a
single, small-footprint device.  The Up-Flo™ Filter utilizes settling, screening and filtration to
remove  gross debris and  suspended sediment from challenge  water runoff.   Specifically, the
Up-Flo™ Filter will remove over 80% of fine total suspended solids (TSS) from challenge water
runoff, and it will also remove a portion of total phosphorus  and other pollutants commonly
found sorbed to  the surface  of suspended  sediment particles such as  metals  and organics..
Verification of the  removals  of metals,  organics (except that measured as chemical oxygen
demand [COD]), and other pollutants is not included as part of this test plan.

Regular maintenance events are necessary to ensure optimal performance of the Up-Flo™ Filter.
In-field  maintenance includes removing floatables, sediment and other pollutants from the sump
and changing  out the Media Packs. In-field inspection should  occur regularly. In-field Media
Pack replacement should occur once a year or as needed.  The in-field maintenance of each catch
basin Up-Flo™ Filter unit should take a half-hour or less. Maintenance on the Up-Flo™ Filter
test unit will occur after each phase of performance testing. The side of the Up-Flo™ Filter test
                                           15

-------
tank is equipped with an 18-inch access port to facilitate sump cleanout (see Figure 3-7).  To
replace  media packs, entry  into the test tank is necessary.  The  tank  is spacious enough  to
provide comfortable access for one maintenance person. It is not anticipated that confined space
issues will need to be addressed during this testing since the test  tank will be open to the
atmosphere.

To  properly maintain the Up-Flo™ Filter, follow the  steps detailed in the Up-Flo™ Filter
Operation & Maintenance Manual (Appendix A).

3.7    Performance Measures for the Verification Test

The performance capabilities of the Up-Flo™ Filter unit will be assessed both quantitatively and
qualitatively. Sampling and  analysis of the influent, effluent, and residues will provide data  to
determine the treatment efficiency of  the  unit  with quantitative data. Recording of visual
observations,  operational  issues and  maintenance  requirements will  provide  a  basis for
qualitatively assessing the unit's performance. The entire test plan, including the Experimental
Design, Sampling and  Analysis Plan,  and  Quality  Assurance Project Plan,  is  focused  on
obtaining performance-based data that will serve as the foundation of the verification report and
the verification statement.

3.7.1   Contaminant Selection and Monitoring for Performance

The Up-Flo™ Filter unit is designed to  remove solids and  solids-associated pollutants, such  as
particulate-bound phosphorus  in runoff. Based  on  the unit's  capabilities a  list  of targeted
contaminants that will be monitored for  removal by the unit has been selected. The targeted list
is as follows:

Targeted Contaminant List

       •  Suspended sediment concentration (SSC)
       •  Total suspended solids (TSS)
       •  Particle size distribution (PSD)
       •  Total phosphorus (TP)
       •  Reactive phosphorus (RP)

These constituents, in addition to COD [as a surrogate for the added organics], will be measured
in  influent and effluent samples in accordance with the experimental design and the Sampling
and Analysis Plan. The results will provide data for determining the  performance capability  of
the unit to remove targeted contaminants  and provide  data on the  additional  and secondary
contaminants as well. All of these data will be reported in the verification report as part of the
quantitative performance measurements.

3.7.2   System Component Operation and Maintenance Performance

The overall  system performance will be measured both quantitatively  and qualitatively.
Quantitative measurements will include determination of the range of hydraulic flow conditions
                                           16

-------
that  can be handled by  the unit.  The hydraulic capacity  of the  unit will be determined by
measuring  the  hydraulic flow  rate in volume of water treated and flow rate handled. The
experimental design includes both hydraulic loading tests  and loading of contaminants to the
unit. The filter media will be stressed to exhaustion and spike loads will be charged to the unit at
high flow rates. The mass removal of contaminants will be determined.

Qualitative measures will be assessed by observations of and experience with the unit during the
setup and testing phases. Records  will be maintained on the  ease and time of installation, the
time and  ease  of maintenance for cleanout and absorption medium replacement, and other
operating observations. The unit is a simple design with no  controls, instrumentation, alarms, or
other mechanical or electrical devices that will require operation. The unit will be monitored for
solids  or debris buildup, clogging of entry paths, and other  related operational  issues. The
Operations and Maintenance (O&M) Manual provided by Hydro International will be reviewed
for its specificity and completeness. These observations, experiences, records and review will be
the basis for evaluating the system performance in terms of operation and maintenance.

3.7.3  Quantification of Residuals

Testing the Up-Flo™ Filter will  create residual  material,  such as removed  contaminants,
sediments,  and spent filter media.  The  quantity of residual materials requiring disposal is  a
factor in performance measurements.  Refer to Section 4.5  of this test plan for a discussion of
how residual materials will be quantified during the tests.
                                           17

-------
                                       Chapter 4
                                 Experimental Design
4.1    Introduction
The experimental design described in this  test plan is  designed to obtain quantitative and
qualitative data on the performance capabilities of the test equipment. The data collected will
serve as the basis for determining the effectiveness of the treatment unit to reduce constituent
loads in the influent synthetic challenge  water.  The data collected in accordance with the
experimental design and  Sampling and Analysis Plan will be presented in the verification report
and serve  as the basis for the verification statement for this technology.

The experimental design  follows the methods and procedures defined in the protocol. The design
incorporates all of the elements described in the protocol and includes all of the phases of testing
prescribed. There are three deviations or  exceptions from the protocol as understood by the
Testing Organization.  These deviations are:

    1.  The measurement of head loss is not directly applicable due to the design of the Up-Flo™
       Filter; and
    2.  The synthetic  challenge water concentrations are  set  to reflect actual  challenge water
       concentrations and the particle size distribution will be selected based on those required
       by  New  Jersey  Department  of  Environmental  Protection  challenge  water device
       evaluation protocols.

The verification test will be a controlled test. The  testing will be  performed on a full-scale unit
set up in  the PSH laboratory. The  PSH laboratory is a physical  testing  laboratory with space,
tanks, piping, utilities, etc., to perform medium-to-large scale (10 - 50 gpm) testing of this type.
A synthetic challenge water will be used for the testing. The  synthetic challenge water will be
made as described later in this section and dosed to the unit as prescribed in the protocol.

4.2    Test Site and Setup

The test site will be  the PSH Environmental Engineering water/wastewater laboratory at the
facility in Middletown,  Pennsylvania. The physical  laboratory is  setup to handle large flow
testing and full-scale unit testing. The facility has space to setup several large tanks and piping to
convey the challenge water to the full-scale test unit. The lab can supply up to 50 gpm of city
water as  a main  feed during the testing  and  has ample electrical service to run all  pumps,
controllers, samplers, and associated equipment.

As stated  earlier,  the Up-Flo™ Filter unit used for the verification test will be that of a full scale
commercially available one-module catch basin configuration. It will be the standard one-module
configuration sold for catch basin applications used for this in-drain application. The unit will be
placed in  a tank that simulates a catch basin. Influent to the unit  will be pumped into the same
elevation  as the grate inlet (relative to the unit) so that flow  can move through the  system by
gravity and the driving head in a manner similar to a field application.  Effluent from the unit
                                            18

-------
will flow by siphon out of the side of the test unit in the same manner that the flow exits the unit
in the field.

Figure 3-10 shows the process flow diagram and equipment configuration for the test setup. City
water will serve as the main water feed with a maximum flow rate of up to  50 gpm.  A flow
control valve will control the flow.  The flow rate of the water will be measured using a standard
"paddle wheel" style flow  meter that will show flow rate (gpm) and will totalize the volume
processed (gallons).

Synthetic challenge water will be made by adding pre-mixed and sized solids, with a specific
amount of a particulate  phosphorus source (potting soil with compost) to the city water.  One
tank will be used to hold stock solution of these materials. A dry feeder will be used to feed a
mixture of clay, topsoil, and sand to the city water.  Initial tests in the lab found that the sand
could not be kept in suspension even in a stirred sample bottle. Therefore, the dry feeder will be
used to feed the solids into the pipe with sufficient mixing area available in the pipe between the
solids-addition point and the entry to the device. The sieve size analysis of the selected solids
mix is shown below, as  specified by  a New Jersey  testing plan,  is provided in Table 4.1, and is
displayed graphically in Figure 4-1.

Table 4-1.  Particle Size Distribution
Description
Coarse sand
Medium sand
Fine sand
Very fine sand
Silt
Fine Silt
Clay
Particle Size Sandy loam
(um) (percent by mass)
500-1,000
250
100
50-
8
2
1
-500
-250
-100
-50
-8
-2
5
5
30
15
25
15
5
This distribution can be approximated by mixing a pre-sieved concrete plant sand with the Sil-
Co-Sil 250 to be purchased from U.S. Silica, Inc. (or one of its distributors). The mix is 42.5%
sand and 57.5% Sil-Co-Sil 250.
In addition, Miracle-Gro™ topsoil will be added to this particle mixture to generate the required
additional phosphorus (above that supplied by the STPP in the organic mixture). Testing at PSH
on  this topsoil showed that the phosphorus  content measured  as  total  phosphorus  (TP)  is
approximately 0.4 mg TP/g Miracle-Gro™. Prior to the onset of testing, the phosphorus content
will be determined in a solution of well-mixed challenge water.
                                           19

-------
                                 Mixed sieve Analysis
   o.
100 1
90
80
70 -
60
bO
40
30 -
70
10
n










—^
o



t






o
(N










O
ID










8

^




J'



o










8
ID










O
O
O










O
8
(N










O
8
ro










o
o










o
8
ID

	 Mix % Passing

                             Particle size in Microns


Figure 4-1.  Sediment particle size distribution graph.

All sampling will be performed manually for all test sequences. This eliminates the concern
regarding the collection of representative solids when using automatic sampling equipment.

The synthetic challenge water will enter the treatment unit through the open top  of the device
grating, flow through the sump/sediment collection section, and pass over/through  the absorbent
materials. The treated water will exit through the outlet pipe along the side of the unit (see earlier
figures). Flow rates will be measured both at the beginning and outlet of the system. A sampling
port will be located in the effluent pipe that will be set up for collection of manual grab samples.
All sampling will be performed manually for all test sequences.

4.3    Test Phases - Hydraulic Loading

The unit will be  tested  under varying hydraulic load  conditions to  simulate typical conditions
found in wash water applications (i.e., catch  basins and drain inlets in  streets, parking lots, etc.)
and during  challenge water  flows. The  primary operational characteristics  will be tested to
determine:

       •  Performance under intermittent flow conditions;
       •  Performance under different hydraulic loadings, including peak flow;
       •  Performance at different contaminant loadings; and
       •  Capacity of the unit to contain contaminants.

The testing will be done in four phases that will include conditions designed to test all of the
above-mentioned operating scenarios. The Phases described below follow the same Phases that
are discussed in the protocol.  The actual order in which this testing is accomplished may change,
but all four phases will be completed.
                                           20

-------
4.3.1   Phase I - Performance under Intermittent Flow Conditions

In  Phase I the system will be operated intermittently to simulate actual in-drain  treatment
applications during intermittent loadings at flow rates that are typical average flow rates over a
period of time. The Up-Flo™ Filter catch basin unit, with one to six filter modules, is designed
to treat flow rates of up to approximately 20 gpm per filter module before any water is bypassed
through the overflows. A more  typical average flow rate at a catch basin or drain  inlet is
expected to be in the 10-15 gpm range. A flow rate of approximately 10 gpm will be used for the
Phase I five day test.

The intermittent tests will be run for a five day period. Each twenty-four hour period will consist
of an  eight-hour ON cycle, followed by a 16-hour OFF cycle. During the eight-hour ON cycle,
the unit will receive flow for 15 minutes, followed by a 15-minute period with no flow.  The
result will be 16 flow periods in the eight-hour ON cycle (two 15 minute flow periods per hour
for 8 hours). The flow will be constant during the dosing periods at  a flow rate of approximately
10 gpm.

The well-mixed stock solution tanks will be filled prior to the test and the volume recorded. The
chemical feed pumps will be calibrated prior to the start of the testing and set to the appropriate
feed rates. The test will be started by opening the flow control valve for the main water supply
and turning on the chemical feed pumps. Flow rates will be checked and recorded. The flow will
be maintained for a 15-minute period and then the water supply and chemical feed pumps turned
off for 15 minutes. This cycle will be repeated for the eight-hour ON test period. The entire cycle
will be repeated for five days.

Samples of both the influent and the effluent will be collected by manual grab samples. Samples
will only be collected of the influent and effluent when flow is  being sent to the  unit.  The
parameters being monitored  will be composites  over the operating day.  Samples for both the
solids  and phosphorus analysis will be collected manually with one liter of sample collected
every 500 gallons (approximately  once  every two hours), and these individual grabs  will be
composited once the samples are returned to the laboratory.  Table 5-1 in the  Sampling and
Analysis Plan Section provides a summary of all sampling and analysis schedules for verification
test.

On the first and third day of intermittent cycling, a special sampling program will include one-
hour  composites  (8 total) for TSS,  particle  size distribution  (PSD),  and total  and reactive
phosphorus. Grab samples will be collected during each of the two 15 minute flow cycles each
hour and composited into a single sample for analysis. On these two days,  the eight-hour flow
weighted composite for TSS, PSD and total and  reactive phosphorus (described above) will not
be collected and analyzed. The TSS analysis will follow the same special procedure. The entire
volume of sample from the grab samples will be filtered for the solids test. This will ensure that
the heavier particles (sand) are contained in the sample being filtered and not left in the sample
bottle. This procedure is described further in Section 5.

Flow  rates will be monitored throughout the test period on a minimum of a once per hour basis.
Cumulative volumes processed during the test will be monitored based on the flow rates  and the
                                          21

-------
totalizing flow meters. All flows (influent, stock solution feeds, effluent) will be recorded in a
permanent logbook. The logbook will also be used to record observations made during the test
runs.  Observations will include a physical description of the effluent water with respect to color,
oil sheen, etc.  The unit will be observed for any evidence of clogging, change in operating head
or head loss, flow patterns, or any evidence of bypass  or short-circuiting.

The protocol calls for the measurement of head loss as part of the monitoring of flow conditions
in the unit. Head loss is a concern for in-drain units that are inserted into the drain and have no
bypass or ability to overflow.  If head loss is high, then the drainage system capacity is limited
and flooding can occur on surface areas.  The Up-Flo™ Filter unit, however, is  designed to
bypass any flow that does not pass through the absorption media.  The unit has a bypass design
capacity that is greater than the typical  inlet grate. By designing the unit bypass capacity larger
than the inlet grate capacity, it is ensured that flooding cannot occur due to a backup or plugging
of the absorption media.

Given that the unit is fed by gravity, is open at the top, and has an overflow capacity greater than
the  inlet,  it is  not possible  to  measure  head  loss  on the influent  stream  to the unit.   An
approximation of the depth of water over the filter media in the treatment chamber will be
monitored by noting whether water is bypassing the treatment media, and reported as an estimate
of the head loss  through the media.  This head loss,  however,  only impacts the capacity of the
unit to treat water and does not impact the concern regarding flooded conditions.

As described in  Section 4.2, the unit will be  fed by gravity in a similar manner to the flow
conditions expected in the field applications. The flow will enter the top of the unit and flow by
gravity into the  unit.   All effluent will flow out of the unit by gravity and  exit via the open
channel leaving the test unit. The intermittent  flow cycles will simulate conditions that  can be
expected during  small rain events or during flows from a commercial/industrial operation that
might reach a storm drain inlet or catch basin.

The unit has a relatively large capacity  (approximately 40 cubic feet) for  holding sediment
(settled solids). The challenge water will have  approximately 300 mg/L of sediment. Assuming
100% removal from a flow of 12,000 gallons and a 90 pounds per cubic foot bulk density, the
retained sediment would occupy 0.2 cubic feet. Therefore, sediment  cleanout is not anticipated
until the Phase I test is completed. The vendor has indicated that the  unit will most likely reach
capacity for this synthetic water due to blinding of the filter media by the fine sediment and soils.
The estimate is that the unit will handle in the range of 1.2 million gallons of water containing
300 mg/L of solids. Based on  these initial estimates,  it is not expected that the unit will require
maintenance or changing of the absorbents during the Phase I test period.

At the end of the Phase I period, the unit will be inspected to determine the condition of the
sediment chamber and the absorbents. Observation of an increase in water depth in the test tank
during the test run will provide  an indication if the media is beginning to blind  or plug. If the
media and sediment  chamber are in good  operating condition,  the media will be removed,
drained, weighed and  returned to the unit for the capacity study. If the sediment chamber appears
to be filling quicker  than expected or the media is beginning to plug as  indicated by water
                                           22

-------
draining through the bypass holes during the low-flow testing, the unit will be cleaned and the
media pack will be replaced as described in Section 4.5.

4.3.2   Phase II —Determination of the Capacity of the Unit

The objective of the Phase II testing will be to run the unit to "exhaustion" with respect to the
capacity of the absorbent material to remove suspended solids and/or phosphorus. During this
phase of testing, the unit will be operated under continuous flow conditions for 16 hours a day
until the unit plugs with solids or the  absorption capacity is exceeded. The protocol calls for
continuous operation during the capacity test. However, the test  set up  is based on manual
operation  and observation.  The high water flow rates and  manual operation require that a
technician be present at all times to ensure water overflows or other problems do not occur. The
PSH lab normally operates on an 8-hour day but will extend to 12-hour operation for this test. It
is not practical to operate twenty four hours per day.  Further, it would be highly unusual for an
in-drain unit to flow at near maximum flow  continuously until exhaustion occurred.  Therefore,
operating on a  12-hour basis should  not have any impact on the overall capacity results or the
applicability to the real world.

If the unit is in good operating condition after Phase I, the loading placed  on the unit sediment
chamber and filter media will be incorporated into the capacity  test as provided for in  the
protocol. The total  loading from Phase I will  be added to Phase II data to calculate total capacity.
If the unit has shown signs of plugging or reaching capacity in the Phase I test, then the unit will
be cleaned and fresh absorbent will be  placed in the unit prior to the start  of the test. The flow
rate for this test will be set at 16 gpm, which is approximately 80% of the maximum rated flow
capacity of 20 gpm.

Based on vendor information, it is not expected that capacity  of the absorbent will be exceeded
before the loading of suspended solids begins to plug the filter media  and causes the unit to
overflow through the bypass openings.  The filter media is expected to "blind off due to the
presence of the small sediment particles and high solids loading.  It is not known how much
loading the unit can receive before the capacity is exceeded. If the unit capacity  has not been
exceeded in the first 12 hour run (about 11,500 gallons of water), the unit will be operated for a
second 12 hour period on day two or until the solids capacity is reached.  If after the second 12-
hour period indicates exhaustion has not been  achieved, then the unit will be  started  again and
will continue to be dosed on a 12 hour run  schedule until the maximum absorption capacity is
reached.

Samples will be collected on a grab sample basis. Samples from the influent and effluent will be
collected at the start of the test and after approximately each 10,000 gallons of influent flow, and
analyzed for the primary constituents (TSS, SSC, COD, TP, RP). During the second 12-hour test
period (day two), the same sampling schedule will  be maintained.  Samples will only be analyzed
for water volumes up to the time that unit  begins to blind off and cannot pass the  all of the
influent through the filter/absorption  media. If the  capacity of the unit is found to be larger than
23,000 gallons (two  12-hour feed days), samples will continue to be collected until the capacity
is achieved.
                                           23

-------
Flow rates will be monitored throughout the test period on a minimum of a once per hour basis.
Cumulative volumes processed during the test will be monitored based on the flow rates.  All
flows (influent, stock solution feeds, effluent)  will be recorded in a permanent logbook. The
logbook will also  be used to record observations made during the test runs. The water depth over
the filter media will be monitored and recorded. Increasing  depth at the set flow will  be  an
indication that plugging is starting to occur. When the media begin to plug, the water depth will
increase and eventually the challenge water will begin to exit through the bypass. At that time,
the unit will be assumed to have reached capacity. Observations will include physical description
of the effluent water with respect to color, oil sheen, etc.

At the end of the Phase II test, the unit will be cleaned and the media pack will be replaced as
described in Section 4.5.

4.3.3  Phase III Performance Under Varied Hydraulic and Concentration Conditions

This phase of testing will focus on determining the unit's hydraulic capacity and how well it
handles spike loads of constituents. Phase III will have three distinct parts.

4.3.3.1    Part 1: Hydraulic Capacity with Clean Water

The  vendor has stated that one Filter Module has a rated capacity of 20 gpm for treating water.
Flows above 20 gpm are bypassed through the bypass openings in the top of the unit. In order to
confirm the rated treatment capacity the unit will be challenged with increasing flow rates using
clean water in the Part I test.

The test will start with a clean unit containing fresh media. Only the clean water line will be used
for this test. The  Drain-Down Port on the  base of the  Outlet Module will be plugged prior to
testing. Flow will start at 10 gpm of fresh water for a period of 15 minutes. After 15 minutes, the
flow will be increased to  15 gpm for a period of 15 minutes. Flow will continue to be increased
by an additional 5 gpm (20, 25, 30, etc.) in 15-minute increments until flow begins through the
bypass.  The  maximum flow rate achieved, before bypass and  after bypass occurs, will  be
recorded in the logbook. After achieving the maximum treated rate, the flow will continue to be
increased to challenge the bypass system. Flow will continue until the maximum available fresh
water rate is reached. All flow rates and operating observations will be recorded in the logbook
along with any physical observations regarding the unit response during the test.

As discussed in Section 4.3.1, the protocol calls for the measurement of head loss during several
phases of testing.  The design of this unit however does not lend itself to head loss determination,
and head loss in the unit itself is not a cause for concern with respect to flooding. There will be
no head loss due to the unit on the entry line, as the water will flow by gravity into the unit. It is
not expected that the unit will actually go to bypass at any time during this test. The unit capacity
for overflow described earlier is  much higher than the maximum flow rate of water available to
the laboratory. Observations of  the  water elevation at  various  flows will  be  made so that
estimates of media head loss can be made.  The overflow will be monitored and water height at
various bypass flow rates will be recorded.
                                           24

-------
4.3.3.2    Part 2: Hydraulic Throughput with Synthetic Challenge Water

The Part 2 testing will follow the same approach as the Part 1 testing except that the synthetic
challenge water will be used as the influent water. In this part, the chemical feed pumps and dry
feeder will be used to add the stock solutions to the fresh water. At each increase in flow rate, the
pumps and feeder will be increased in rate in ratio to the fresh water feed to maintain a constant
concentration of constituents in the synthetic challenge water.

The test will be conducted after the Part 1 test and will use the same filter media that was used
for the Part 1 test.  Flow will start at 10 gpm for a period  of 15 minutes.  After 15 minutes, the
flow will be increased to 15  gpm for a period of 15 minutes. Flow will continue to be increased
by an additional 5 gpm (20,  25, 30, etc.) in 15-minute increments until flow begins through the
bypass holes. The maximum flow rate achieved before bypass and after bypass begins will be
recorded in the logbook. After achieving the maximum treated rate, the flow will continue to be
increased to challenge the bypass system. Flow will continue to be increased until either, the
bypass is at capacity and the  unit begins to flood, or until the maximum available fresh water rate
is reached. All flow rates and operating observations will be recorded in the logbook along with
any physical observations regarding the unit response during the test.

Grab samples of the influent and  effluent will be collected at each flow rate condition until the
unit  floods or the maximum available  feed water capacity  is reached.  All  samples will  be
analyzed for the complete list of constituents (solids and phosphorus).

During this part as in  all test runs, all flow rates and operating observations will be recorded in
the logbook, along with any physical observations regarding the unit response during the test.

4.3.3.3    Part 3: Impacts of Spike Concentration Loadings

Part 3 is  a test series designed to evaluate the impact that spike loadings may have on the unit's
ability to remove key  constituents. The key constituents for the Up-Flo™ Filter are TSS, SSC,
PSD, TP and RP. The test protocol for Part 2 will be used to increase the hydraulic loading to the
unit, and increasing the concentration of solids (including total phosphorus particulates) will
increase the concentration of the parameters in the synthetic challenge water.

Using the same unit (no cleanout  or media pack) as for Part 2, the test procedure will start at a
flow rate of approximately 10 gpm. The chemical feed pump rates of the stock solutions and dry
feeder will be set  at a factor of  four times higher than used in the previous tests.  This will
increase the concentration of constituents by a factor of four. After 15 minutes,  the flow will be
increased to 15  gpm  for a  period of 15  minutes. Flow will  continue to be increased by  an
additional 5 gpm (20, 25, 30, etc.) in 15-minute increments until flow begins through the bypass
mechanism. The maximum  flow  rate achieved before bypass  and after bypass begins  will  be
recorded in the logbook. After achieving the maximum treated rate, the flow will continue to be
increased to challenge the bypass system. Flow will continue to be increased until either, the
bypass is at capacity and the  unit begins to flood, or until the maximum available fresh water rate
is reached. All flow rates and operating observations will be recorded in the logbook along with
any physical observations regarding the unit response during the test.
                                           25

-------
Grab samples of the influent and effluent will be collected at each flow rate condition until the
unit floods or the  maximum  available feed water capacity is reached.  All samples will  be
analyzed for all constituents of interest.

At the end of the Phase III tests, the unit will be cleaned and the media pack will be replaced as
described in Section 4.5.

4.3.4  Phase IV: Contaminant Capacities at High Hydraulic Throughput

The influence on treatment efficiency of high hydraulic  loads on the unit will  be tested in
Phase IV. The Phase IV test will be a capacity or "exhaustion test" similar to Phase II, except the
unit will be under higher hydraulic loads typical of a very large flow event. The Up-Flo™ Filter
unit is somewhat unique in that it will treat all of the water that can pass through the treatment
chambers and then bypass the remaining water. Thus, at higher flows (above treatment capacity)
it will not backup  and flood an area around the inlet, but rather  will treat a set flow, about
20 gpm/ft2 of filter media, and the additional flow will be bypassed to the catch basin outlet and
enter the collection system.  Only if the bypass flow rate  capacity and treatment capacity are
exceeded will water begin to backup and flood. Under this high flow rate test, the unit will  be
operated above the  rated treatment capacity with the bypass flowing and removing the extra
flow. It  is expected  that the flow rate will be approximately 40 gpm (approximately 20 gpm to
treatment; 20 gpm  to bypass), which is above the treatment capacity and about 80% of the
available flow rate at the laboratory. The test will demonstrate the system's treatment capability
when it  is operating in bypass mode. Flow to the unit will be on a continuous basis for a 12-hour
period. This time may need adjustment depending on the capacity determined during the Phase II
test. The test will start with a clean unit with fresh absorbent.

Prior to starting the Phase IV test,  the capacity  of the unit will have been determined during
Phase II and the anticipated run time to reach "breakthrough" will be recalculated. If a longer run
is needed the unit will be operated for additional time or until capacity is achieved.

Observation of the  flow rates through the treatment unit  and the  bypass will be used as the
primary indicator that solids capacity has been reached. When flow rates in the treatment section
decrease by 25% or  more for 30 minutes, capacity will be considered to have been reached. If for
any reason the results after the two 16-hour periods (or  alternative time determined in Phase  II)
indicate exhaustion  has not been achieved, then the unit will be started again and will continue to
be dosed on the 16-hour schedule until the maximum capacity is reached.

Samples will be collected on a grab sample basis. Samples from the influent and effluent will be
collected at the start of the test and after every 10,000 gallons of water treated and analyzed for
the primary constituents. If additional 12-hour test  period(s) are needed, the same sampling
schedule will be maintained.  Samples will only be analyzed for water volumes up to the time that
unit begins to blind off and the treated water through the  filter/absorption media decreases  by
25% or more.
                                           26

-------
Flow rates will be monitored throughout the test period on a minimum of a once per hour basis.
Cumulative volumes processed during the test will be monitored based on the flow rates.  All
flows (influent, stock solution feeds, effluent) will be recorded in a permanent logbook, which
will  also be used to record observations made during the test runs.  Observations will include
physical  description of the effluent water with respect to color, oil sheen, etc. The unit will be
observed for any  evidence of clogging, change in operating head or head loss, flow patterns, or
any evidence of bypass or short-circuiting.

At the end of the Phase IV test,  the unit  will be cleaned and media pack will be  replaced as
described in Section 4.5.

4.4    Influent Characterization

4.4.1  Synthetic  Challenge  Water

The verification test will be performed using synthetic water made from a mixture of solids - one
of which will provide the particulate phosphorus required by the test plan. As described in the
protocol, this water is intended to simulate actual products that may be present in runoff waters
entering a drainage  system. The following  products will be used to make the synthetic challenge
water:

   •  Regular unleaded gasoline;
   •  Diesel fuel;
   •  10W-30 motor oil;
   •  Brake fluid;
   •  Antifreeze (glycol based);
   •  Vehicle washing detergent (specific chemical addition - see below);
   •  Windshield washer fluid;
   •  Sil-Co-Sil 250;
   •  Miracle Gro™ Topsoil  sieved to remove visible large twigs, etc.; and
   •  Concrete plant sand sieved to a size of all passing through 5,000 jim.

These products or materials will be purchased and the same material/product will be used for all
tests. Sil-Co-Sil is supplied by U.S. Silica, Inc. and is sold for use in abrasive applications. The
total phosphorus content of the mixture will be  supplied by a potting soil/topsoil amended with
compost. It will be purchased from a local home improvement store. The concrete plant mix sand
will be purchased from a local concrete products manufacturer.
                                           27

-------
Table 4-2.  Revised Synthetic Challenge Water Concentrations
                              Parameter
     Concentration
        (mg/L)
                   ssc
                   TSS
                   Total phosphorus (as P)
                   Reactive phosphorus (as P)
                   TPH
          300
          300
           5
          1 -2
         10-20
A formula using a mix of the above named products/materials has been made and tested in the
laboratory to determine the conformance to these specifications.  The synthetic mix that was
prepared and tested is shown  in Table 4-3. The  results of testing the topsoil/potting soil for
phosphorus content is 0.4 mg  TP/g Miracle-Gro™ topsoil  The addition of topsoil  is in  such
small concentrations that the sieve size analysis of the mixture of Sil-Co-Sil, concrete-plant sand
and topsoil is identical to the solids mixture sieve analysis shown in Figure 4-1.
Table 4-3. Synthetic Challenge Water Mix Stock Concentrations
 Product or Material
Concentration in Water (mg/L)
 Regular unleaded gasoline
 Truck diesel fuel
 10W-30 motor oil
 Brake fluid
 Antifreeze (glycol based)
 Dodecylbenzenesulfonic acid (LAS)
 Sodium tripolyphosphate (STPP)
 Windshield washer fluid
 Topsoil and Sil-Co-Sil 250 mixture
             0.08
              3.9
              19
             0.97
              10
              10
              2
              10
              300
The product concentrations in Table 4-3 represent a deviation in the constituent concentrations
identified in the protocol.  The hydrocarbon concentrations specified in the protocol were not
achievable in prior testing due to the insolubility of hydrocarbons with water.  For this test plan,
the VO agreed that the hydrocarbon concentrations could be decreased further (to  a targeted
concentration  range  of  10 to  20  mg/L)  since  the  vendor makes  no specific  claims  for
hydrocarbon  treatment.    Also,  no  sufficient  challenge product  to increase the  metals
concentrations to those specified in the protocol  have been identified,  so the metals will be
contributed from those present  in the clean water source  plus the trace metals present in the
sediment mixture.  Since the vendor did specify a performance claim for phosphorus treatment, a
topsoil  fortified  with fertilizer  shall be  used  to increase  phosphorus  concentrations  to
approximately 5 mg/L.   The VO, TO, and vendor  agree that the materials that comprise the
                                           28

-------
synthetic  challenge water  should  provide  a  condition  suitable  to  adequately verify  the
performance of the Up-Flo™ Filter against the protocol requirements.

4.4.2  Stock Solutions

The  standard mix determined above (Table 4-2) will be used for all of the verification tests. The
Sil-Co-Sil, topsoil,  and sand will be fed from the dry  feeder and set to meet the concentration
targets in the established mix.  The solids will be premixed prior to filling the dry feeder hopper
to homogenize the solids feed. The hopper will be refilled frequently to ensure that the solids do
not separate during the test.

The  remaining products will be mixed into two separate solutions. One solution will include the
hydrocarbon-based  products (gasoline, diesel fuel, motor oil, and brake fluid), while the other
solution will include the water-soluble products (antifreeze, LAS, STPP, and windshield washer
fluid).  The two solutions shall be prepared using the following specifications:

   •  Hydrocarbon mixture (fed into the water at a rate of 0.03  mL per liter of water):
          o   10 grams (g) motor oil
          o   2  g diesel fuel
          o   0.05  g gasoline
          o   0.5 g brake fluid

   •  Water-soluble mixture (fed into the water at a rate  of 0.1  mL per liter of water):
          o   10 g  windshield washer fluid
          o   10 g  antifreeze
          o   10 g  LAS
          o   2  g STPP
          o   Mixture diluted to  100 mL with tap water

4.4.3  Influent  Characterization during the Verification Testing

The  influent synthetic challenge water will be sampled and analyzed during all of the various test
conditions  described in Phases I - IV in Section 4.3. While the generic protocol allowed for
single daily samples of the influent in several test cases,  the approach used in the test plan is to
match  influent and effluent samples as often as possible for  all sampling periods.  This will
ensure that the actual influent concentrations will be known for all test conditions.

Because of the large water volumes needed for these tests it was not practical to make a single
large daily batch of synthetic water to supply the entire day's flow.  Instead, the system will use
more concentrated  stock solutions that  will be injected  into the fresh water flow in the open
channel section.   Given the potential for some variation  in the  actual mixed influent water, the
test  plan calls for influent samples, both grab and composites from the manual grabs,  to be
matched with  the effluent samples.  This will serve as a check on the feed systems and insure
representative influent data is available for determining unit treatment and removal efficiencies.
Table 5-1 in the Sampling and Analysis Plan shows a summary of all samples being collected
during each phase of testing.
                                            29

-------
4.4.4  Solids Characterization during the Verification Testing

Influent  and effluent solids will  be characterized using  the  Coulter  Counter Particle  Size
Analyzer for particles in the range of 0.6 |j,m up to 220 |j,m. Particles above 220 |j,m will be
characterized by sieving the samples through a stainless steel sieve with a mesh size of 220 |j,m.
The combination of the Coulter Counter results and the sieve analysis for the large particles will
allow for a complete characterization of the influent and effluent particle distribution between
0.6 |j,m and 5,000 |j,m. The results for the solids analysis will be subdivided into removal for the
following particle size ranges:

   •   0.6 - 3 |j,m
   •   3 - 12 urn
   •   12-30 urn
   •   30-60 urn
   •   60 - 120 urn
   •   120 - 220 urn
   •   > 220
4.5    Effluent Characterization

The effluent quality will be monitored during all Phases of testing except during the fresh water
hydraulic test in Phase III, Part 1 .  Treated effluent grab samples and samples composited from
manual grab  samples will  be collected.   The  sampling  plan shows the details of the actual
samples being collected in Table 5-1.   The  sampling  and analysis approach focuses frequent
sample collection and analysis on the key parameters for  evaluating the Up-Flo™ Filter unit as
described previously.  Less  frequent  sampling  and  analysis  is scheduled  for  secondary
parameters.

The primary parameters will be used to evaluate the efficiency of treatment by providing a sound
basis  for comparing  influent water quality with effluent water quality. In  addition,  these
parameters will also provide  information on  the unit's capability to remove these constituents
and will also provide general information on their fate as they  pass through the unit. This is
particularly true for nutrients, which the unit will only remove if they are in the insoluble form
and settle with the solids or if they are bound to organic materials that are absorbed as part of the
petroleum hydrocarbon absorption process.

Specific details on the sampling and analysis frequency and parameter list are provided in the
Sampling and Analysis Plan Section and in the previous sections describing the test phases.

4.6    Residue Management

Residues, including sediment in the settling chamber and  the absorbent media, will be removed
from the unit at the end of some phases of testing as described in Section 4.3. Measurements will
include the volume  of residues/media collected  and the wet weight of residues/media collected.
These  data will be used to provide information on typical cleanout volume  and weights that can
be expected from normal operation.
                                           30

-------
Solid residues will be collected from the sedimentation chamber in the unit. The sediment will be
removed using a vacuum system (wet/dry shop vacuum) to simulate the typical removal system
used in the field  (vacuum truck). The content of the shop vacuum reservoir will be removed
using scoops, spatulas, scrapers, etc. to remove as much material as possible. These solids will be
measured for wet weight and volume in  order  to evaluate the amount of solids that can be
expected to  be generated and cleaned out of the unit  on a volume throughput/loading basis.
Samples of the solids will also be measured for solids  content so that a dry weight of solids
produced can also be calculated. Three sub samples of the sediment will be collected and percent
solids measured.  The weight of solids collected will  be used to relate the accumulation rate of
solids to total water treated.

One representative sample of the spent filter media and retained solids will be analyzed using the
Toxicity Characteristic  Leachate Procedure (TCLP) prior to disposal. The  leachate will be
analyzed for metals  and for applicable organic materials.  The spent filter media will also be
generated as a residue. The  media packs will be drained and weighed to determine the weight
and volume of material that will require disposal.

4.7    Operation and Maintenance Observations

The Up-Flo™ Filter unit will be installed and  operated by PSH during the test period.  The
vendor  supplied  Operations and Maintenance Manual is  presented  in  Appendix  A. Hydro
International will  also provide consultation on installation and operation of the unit.

Installation of the unit is expected to be straight forward as the unit will arrive at the PSH lab
pre-assembled.  Support brackets with legs sit on the base of the test tank. The filter modules are
secured onto the  support brackets.  The outlet module  has a pipe stub that fits up to the tank
outlet via standard Fernco®  coupling. The test tank has an open top. The Filter Module will be
submerged during  testing.  The  unit's simple  design  provides   ready access  to  all  of its
components  and  all  components can be observed from above and through the viewing  port
during operation.

There are no electrical or mechanical control systems for the unit, no utility hook-ups, and no
moving parts. The unit does not have any alarms  or  indicators  to alert users to replace the
medium that need to be maintained.

The laboratory will  maintain a detailed logbook describing all observations  made during the
tests. Any unit cleaning, clearing of debris, unclogging of the screens or media, etc. will be
recorded. Observations will also be recorded on the ease/difficulty  of installation, operation, and
maintenance. These observations will include a qualitative assessment of the degree of difficulty
encountered during the cleaning of the unit at the end of each phase and on the ease/difficulty of
replacing the Media Pack.

Flow rates, volume  of water processed, amount of stock solutions pumped from the  stock feed
tanks, and related operational data for each test run will be recorded in the operational log. Any

-------
deviations  or changes  from the prescribed test plan will  be thoroughly  documented.  The
measurements of residue volumes and weights will be recorded after cleaning periods.

Any other observations  on the operating condition of the unit or the test system as a whole will
be  recorded  for future reference.  Observations of changes  in effluent quality  based visual
observations, such as color change, oil sheen, obvious sediment load, etc., will be recorded for
use during the verification report preparation.

The operating and  maintenance logbook(s) will be important  records  for  use  during  the
verification report preparation. These logs will provide the information to validate the flow and
operating conditions during the test periods. Further,  they will serve as the basis for  making
qualitative  performance determinations regarding the unit's operability and the level/degree of
maintenance required.
                                            32

-------
                                      Chapter 5
                            Sampling and Analysis Plan
5.1    Sampling Locations
There are two primary sampling locations in the laboratory test system. As shown in Figure 3-10,
the two locations are the influent sampling location just upstream of the entrance to the unit and
the treated effluent sampling location located just downstream of the test unit discharge. Each of
these sampling locations is setup  so  that grab samples can be collected directly into sample
containers. Flow weighted composites for this test plan are straight forward as all test conditions
call for a steady flow rate for a set  period of time.  Therefore, a set sample volume can be
collected on a cumulative flow basis and a flow-weighted composite will be obtained.

In addition to the influent and effluent challenge water samples being collected throughout the
four phases of testing, samples will also be collected of the solids and absorbent material at the
end of each test phase. These samples will be manual grab  samples collected from the residue
material obtained from the test unit. The solids will  be removed from the sedimentation chamber
by vacuuming the  chamber and then collecting the residue from the vacuum reservoir.   The
residue will be placed in  a container for weight and volume measurement.

5.2    Sampling Frequency

Sampling type, frequency and the analytical list will  vary  for each phase of the testing. The
sampling is discussed in narrative form in the experimental design section.  A summary table
showing all of the sampling by Phase is given in Table 5-1.

Table 5-1.  Sampling Locations, Frequency, Type, and Analysis
Phase
Phase I
Day 1-5

Phase II
Capacity
Study

Phase III
Parti
Part 2

Parts

Phase IV



Sample Location

Influent and
Effluent

Influent and
Effluent


No samples
Influent and
Effluent
Influent and
Effluent

Influent and
Effluent

Frequency

1 daily sample each day


1 sample at startup
1 sample/10,000 gal treated
1 sample at end of run


1 sample per flow rate (30,
40, 50, 60 gpm, etc)
1 sample per flow rate (30,
40, 50, 60 gpm, etc)

1 sample at startup
1 sample/10,000 gal treated
1 sample at end of run
Type

Flow-weighted
composite

Grab




Grab

Grab


Grab


Analysis

SSC, TSS, PSD, TP, RP,


SSC, TSS, PSD, TP, RP,




SSC, TSS, PSD, TP, RP,

SSC, TSS, PSD, TP, RP,


SSC, TSS, PSD, TP, RP,




COD


COD




COD

COD


COD


                                          33

-------
5.3    Sample Collection, Preservation, and Storage

There are two basic types of samples being collected for this verification test, grab samples and
flow weighted composite samples from the grab samples. The flow weighted composite samples
will be collected by taking manual grab samples of a set volume at predetermined cumulative
flow points (i.e., 500, 1,000,  1,500, 2,000, 2,500 gallons, etc.)  Flow weighted composites are
only being collected during Phase I, when the flow rate to the unit is held constant for all testing.
Samples will be collected only when the unit is actively being dosed with water.

The  grab samples  will be collected  in individual 250  mL  high-density polyethylene  (HDPE)
bottles. All of the  sample from the bottle for  SSC will  be used to run the analysis. This is
necessary to insure that the heavier sand particles are included in the sample analysis. Pre-testing
in the laboratory has shown that it is difficult to sub sample from a sample bottle containing sand
and obtain a representative sample that includes the heavier sand. Further, the clay present in the
sample tends  to blind the filter paper. Therefore, the sample size must be kept small in order to
pass all of the water through the filter in a reasonable time. The procedure for suspended solids
analysis will be to use the entire contents of each TSS sample bottle. The volume  of the sample
will be recorded and the entire contents will be filtered for TSS  measurement. The bottle will be
rinsed to remove any remaining solids and the rinseate added to the sample being filtered. The
flow weighted  composite result (either one hour or eight hour composites)  will be determined
one of two ways. If the sample from an individual bottle filters easily, then more than one sample
bottle (individual grab) may be  filtered through the same filter paper. In the case of the one (1)
hour composites, two grab samples (two collected per hour) may be filtered together, yielding a
single flow weighted composite result.  The same approach may be used  for the eight hour
composite,  which will consist  of four sample  bottles  (one every two hours) instead of two
bottles. In this approach, the total mass of dry solids measured on the filter(s) will be divided by
the original sample volume (without rinseate  volume)  of the two or four bottles to determine
both the  TSS and SSC concentration. The alternative, if only one bottle of sample (individual
grab) can be  passed through  a  filter, will be  to filter each grab sample individually.  The dry
weight of solids from the individual samples will be added together and the total dry  solids
weight divided by the total sample volume  (of two or four vials) to  calculate  the TSS
concentration. Table 5-2 shows  the bottle types, sample size, and preservation required  for each
parameter.

The  sample bottles  required for the various analyses will be provided by the PSH laboratory.
The bottles will come without  preservative.   If needed, the preservative will be added  to the
bottle after the sample is collected. The samples will be pre-labeled by analysis type.

The PSH physical testing  laboratory is  in the same  building as the chemical laboratory. The
chemical laboratory will perform all of the analysis. Given the  proximity of the laboratories,
samples will  be hand  delivered to  the laboratory login desk with appropriate PSH project
approval  forms and chain  of custody forms.  The samples will be logged in and placed in
refrigeration as needed.  Because of the proximity of the labs, coolers  with ice to  maintain
temperature will not be needed for interim storage or transport.
                                           34

-------
Table 5-2.  Bottle Type, Preservation, and Sample Size by Analysis

   Sample
   Matrix	Analyses	Bottle Type, Size	Preservation, Holding Time
  Liquid    TSS, SSC, PSD      HOPE, 250 mL                      Cool to 4° C,
                                                                      7 days
            Total/Reactive       Amber glass, 250 mL                Cool to 4° C,
            phosphorus                                        pH < 2 H2SO4, 28 days

            COD                Amber glass, 250 mL                Cool to 4° C,
                                                              pH < 2 H2SO4, 28 days
Solid TCLP
Total solids
Glass 250 mL or larger,
special handling for volatiles
HOPE or glass, 500 mL
Cool to 4° C
Cool to 4° C
4 Chain of Custody
Chain of Custody will be maintained for all samples collected during the verification test. The
unit operators who are responsible for sample collection will fill out an NSF project approval
form (See example in Appendix B) for each set of samples. The form will be signed and dated
for each  set of  samples  delivered  to  the  PSH laboratory. The  receiving technician will
acknowledge receipt of the samples by signing the project approval form and providing a copy of
the form to the sample delivery person. All project approval and chain of custody records will be
maintained by the physical laboratory and by the chemical laboratory for all samples. Copies of
the completed project approval forms will be included with all laboratory reports transmitting
final analytical results.

5.5    Analytical Methods

All of the analytical methods used during the verification test will be EPA approved methods or
methods from Standards Methods for the Examination of Water and Wastewater, 20th Edition.
Table 5-3  shows the analytical methods that will be used for the verification test and the typical
detection limits that are achieved by these methods.
                                          35

-------
Table 5-3. Analytical Methods
Constituent

ssc
TSS
PSD

PO4-P

COD
Method No.
ASTMD-
.fVkJ J- -LV_I_ _L/
3977
EPA 160.2
SM 2560

SM 4500-P

EPA 4 10.4
Method
Detection
Limit

5mg/L
5mg/L
N/A

0.2 mg/L

3 mg/L
Lab Reporting
Limits

5 mg/L
5 mg/L
1,000
particles/mL

0.2 mg/L

3 mg/L
Container
Type

500-mL HOPE
500-mL HOPE
HOPE
HDPF nr
_L l l -J l I > \J1
Amber Glass
HDPEor
Amber Glass
Max.
Holding
Time

7 days
7 days
28 days1

7 days1

28 days
1 Because of the concern of bacterial growth in the samples, analysis will be completed within 48 hours, although
the method allows for a holding time of 28 days.
The laboratory will report all results with all associated QC data. The results will include all
volume and weight measurements for the samples, field blank results, method blanks, spike and
spike duplicate results, results  of standard check samples  and  special  QC  samples,  and
appropriate calibration results.  All work  will  be performed within the established  QA/QC
protocol as described in the Quality Assurance  Project Plan (Section 6) and as outlined in the
laboratory  SOPs and the PSH Laboratory QA/QC Plan. Any deviations from the standard test
procedures or difficulties encountered during the analyses will be documented and reported with
the data.
                                            36

-------
                                       Chapter 6
              Quality Assurance and Quality Control - Project Plan

The purpose of this section is to describe the quality assurance/quality control program that will
be used during the test plan to ensure that data and procedures are of measurable quality and
support the quality objectives  and test plan objectives for this verification test.  The quality
assurance activities and scope are based on the guidance provided in the protocol. The plan has
been developed with guidance  from the EPA's Guidance for Quality Assurance Project Plans
and Guidance for the  Data Quality Objectives Process. The  QA/QC plan is  tailored to this
specific test plan and requirements for verification of the Hydro International Up-Flo™ Filter in
this application. The QA/QC Plan is written as part of the test plan and should be read and used
with the test plan as a  reference. The test plan contains descriptions of various requirements of
the QA/QC Plan, and they are incorporated by reference at several locations.

6.1    Verification Test Data - Data Quality Indicators (DQIs)

Several Data Quality Indicators (DQIs) have been identified  as key factors in assessing the
quality of the data and in supporting the verification process. These indicators are:

       •   Precision
       •   Accuracy
       •   Representativeness
       •   Comparability
       •   Completeness

Each  DQI  is  described  below  and  the  goals for each  DQI are  specified.  Performance
measurements will be verified using statistical analysis of the data for the quantitative DQIs of
precision and accuracy. If any  QA objective is not met during the tests, an investigation of the
causes will be  initiated. Corrective Action will be taken as needed to resolve  the difficulties.
Data failing to meet any of the QA objectives will be flagged in the verification report and a full
discussion of the issues impacting the QA objectives will be presented.

6.1.1   Precision

Precision refers to the degree of mutual  agreement among individual measurement and provides
an estimate of random error. Analytical precision  is a measurement of how far an individual
measurement may deviate from a mean of replicate measurements. Precision is evaluated from
analysis of field and laboratory duplicates and spiked duplicates. The standard  deviation (SD),
relative standard deviation (RSD) and/or relative percent difference (RPD) recorded from sample
analyses are methods used to quantify precision. Relative percent difference is calculated by the
following formula:
                                           37

-------
                            RPD = [(Ci - C2) / (Ci + C2) / 2]  x 100%                 (6-1)

Where:
       Ci = Concentration of the compound or element in the sample
       €2 = Concentration of the compound or element in the duplicate

Field duplicates will be collected of both influent and effluent samples. The field duplicates will
be collected at a frequency of one  duplicate for every ten samples collected of influent and
effluent. The laboratory will run duplicate samples as part of the laboratory QA program.

Duplicates are analyzed on a frequency of one duplicate for every ten  samples analyzed. The
data quality objective for precision is based on the type of analysis performed. Table 6-3 shows
the laboratory precision that has been established for each analytical method. The data quality
objective varies from a relative percent difference of ±10% to ±30%.

6.1.2 Accuracy

Accuracy is defined for water quality analyses  as the difference between the measured value or
calculated sample value and the true  value of the sample.  Spiking a sample matrix with a known
amount of a  constituent  and measuring the  recovery obtained in the analysis is a method of
determining accuracy. Using laboratory performance samples with a known concentration in a
specific matrix can also monitor the accuracy  of an analytical method for measuring a constituent
in a given matrix.  Accuracy is usually expressed as the percent recovery of a compound from a
sample. The following equation will be used to calculate percent recovery:

                          Percent Recovery =  [( AT-A; ) / As ] x 100%              (6-2)
Where:
              AT = Total amount measured in the spiked sample
              A;  = Amount measured in the un-spiked sample
              As  = Spiked amount added to the sample

The laboratory will run matrix spike samples at a frequency of one spiked sample for every  15
samples analyzed for solid and liquid samples.  The laboratory will also analyze liquid and solid
samples of known concentration as lab control samples.  The accuracy objectives by parameter
or method are shown in Table 6-3.

6.1.3  Comparability

Comparability will be  achieved by  using consistent and  standardized sampling and analytical
methods. All  analyses will be performed using EPA or other published methods as listed in the
analytical section  (Tables  5-3  and  6-1).  Any deviations from  these  methods will  be fully
described and reported as part of the  QA report for the data. Comparability will also be achieved
by using National Institute of Standards (NIST) traceable standards including the use of traceable
measuring devices for volume and weight. All standards  used  in the analytical testing will  be
                                           38

-------
traceable to verified standards through the purchase of verifiable standards and maintaining a
standards logbook for all dilutions and preparation of working standards.

Comparability will be monitored through QA/QC audits and review of the test procedures used
and the traceability of all reference materials used in the laboratory.

6.1.4  Representativeness

Representativeness is the degree to which data accurately and precisely represent a characteristic
population, parameter at a sampling point, a process condition, or an environmental  condition.
The  test plan  design calls for grab samples of influent and effluent to be  collected and then
analyzed individually or  as flow-weighted composites. The sampling  locations for the grab
samples are designed for easy access and for collection of a large cross section of the flow in the
bottle. This design will help ensure  that a representative sample of the flow is obtained in each
grab sample bottle. Composite samples will be made from the grab  samples. The compositing
procedure includes a thorough mixing of the individual samples prior to pouring the samples in
to the composite container. The laboratory will follow set  procedures (in accordance  with good
laboratory practice) for thorough mixing of any samples prior to sub-sampling in order to ensure
that samples are homogenous and representative of the whole sample.  In addition, special sample
handling procedures for TSS and RP have  been incorporated in the test plan to ensure  composite
samples for these constituents are prepared properly. These procedures include using the entire
grab sample(s) for the analysis, thus having the composite made in the laboratory  rather than at
the time of sample collection. These  special procedures are  described in Section 5.3.

The  laboratory setup for this test  has been designed and reviewed to  determine  that it is
representative  of a typical catch  basin inlet (gravity flow through a grate) and is typical  of the
standard application/installation for  this treatment technology. The Up-Flo™ Filter unit will be
operated in a  manner consistent with the vendor-supplied O&M manual so that  the operating
conditions will be representative of normal installation and  operation for this equipment.

Representativeness  will be monitored through  QA/QC  audits  (both  field  and laboratory),
including review  of the laboratory  procedures for sampling handling and storage, review  and
observation of the sample collection, and review of the operating logs maintained at the test site.

6.1.5  Completeness

Completeness  is a measure of the number of valid samples and measurements that are obtained
during a test period. Completeness will be measured by tracking the number of valid data results
against the specified requirements in the test plan.
                                           39

-------
Completeness will be calculated by the following equation:

             Percent Completeness  =  (V7T)xlOO%

Where:
       V  = number of measurements that are valid
       T  = total number of measurements planned in the test

The  goal  for this data quality  objective will be to  achieve minimum 80% completeness for
samples scheduled in the test plan.

6.2    Project Management

6.2.1  Management Team

The  TO is responsible for management of the test plan including meeting the test plan objectives
and the Data Quality Objectives. Section 2 of the test plan describes the key personnel involved
in this ETV program and the persons responsible to implement the test plan, including a Quality
Control Officer  from NSF who will be responsible for audits,  assessment, and review of
procedures and quality data.  The  phone number, email address, and mailing address  for each
person named are given in Section 2.

6.2.2  Project Description and Objectives

A full description of the project history, the Up-Flo™ Filter technology being verified, and the
objectives has been presented in Sections  1 through 3 of the test plan. A brief summary of the
project is presented herein. Sections 4 and 5 describe the experimental design and the sampling
and analysis plan for the verification test. The reader is referred to the test plan for more details.

The  Up-Flo™ Filter is a patented  treatment-train filtration  device that includes screening,
sediment containment and overflow protection.  The catch basin  configuration Up-Flo™ Filter
unit  is designed for use  in catch basins as  an in-drain treatment technology. Units can  be
manufactured for new or retrofit catch basin installations. Units  are retrofitted into existing catch
basins by removing the grate/cover, installing the components in the chamber, and replacing the
cover.  For  new  installations, a concrete  catch basin with  pre-assembled and  installed
components arrives on site and is installed in ground with a crane.  Water flow enters the sump
and is directed up through  Angled Screens into the bottom (inlet) of the Filter Module.  Floatable
trash, gross debris and coarse sediment are contained in the  chamber, while fine sediment and
associated pollutants are captured in the Filter Module.  Water  then flows to the Outlet Module
through the Conveyance  Channel located at the top  of the Filter Media.   Water in the Outlet
Module flows out of the chamber via a 12-inch outlet pipe.

Units are designed to trap contaminants contained in water flowing through the unit during storm
events, while providing overflow protection to ensure sufficient flow can pass through the catch
basin during intense storm events. Figure 3-1 shows the internal components of the catch basin
                                           40

-------
configuration Up-Flo™ Filter.  The treatment unit that will be tested in this verification is a full
scale, commercially available, one-module catch basin unit.

The primary objective of the ETV is to measure the performance of this technology through a
well-defined test plan that includes measurement of key parameters in the challenge water before
and after application of the treatment technology. This  objective will  be accomplished  by
implementing the sampling and analysis program  described in Section 5 and by meeting the data
quality objectives described in this  Quality Assurance Project  Plan.  The test plan includes
characterizing the synthetic challenge water, installing  and operating the  Up-Flo™ Filter,  and
measuring the influent to  and  effluent from the unit, and all residuals removed and contained
within the Up-Flo™ Filter unit.  The primary parameters being measured are TSS,  SSC, PSD,
TP, and RP. The volume and weight of the residuals will be measured.

6.2.3  Project Schedule

The test elements for this project are divided into four (4) Phases. Phase I is a five-day test run
under normal operating conditions. Phases II and IV are capacity tests that are expected to be
completed in one to three days for each phase of testing.  Phase III is a hydraulic capacity test and
spike  loading test that is expected to require one to two days of system operation.  Table 5-1
shows the sampling schedule by test phase.

6.3   Measurements and Data Acquisition

6.3.1  Sample Collection and Chain of Custody

There are two basic types of samples being  collected for this verification test, grab samples and
flow weighted composite samples. The flow weighted composite samples will be collected by
taking manual grab  samples of a set  volume at predetermined  cumulative flow points  (i.e.,
10,000, 20,000, 30,000 gallons, etc.) Flow weighted composites are only being collected during
Phase I, when the flow rate to the unit is held constant for all testing. Samples will be collected
only when the unit is actively being dosed with water.

The grab samples for TSS  and  SSC will be collected in individual 250 mL HDPE bottles. All of
the sample from  all of the bottles will be used to run the  analysis. This is necessary to insure that
the heavier sand particles  are included in the sample analysis. Pre-testing in the laboratory has
shown that it is  difficult  to sub  sample from a sample bottle containing  sand and obtain a
representative sample that includes the heavier sand. Further, the clay present in the sample tends
to blind the filter paper. Therefore, the sample size must be kept small in order to pass all of the
water through the filter in a reasonable time. The procedure for suspended solids analysis will be
to use the entire  contents of each TSS and SSC sample bottle. The volume of the  sample will be
recorded and the entire contents will be filtered for TSS measurement. The bottle will be rinsed
to remove any remaining  solids and the rinseate added to the sample  being filtered.  The  flow
weighted composite result (either one hour or eight hour composites) will  be determined one of
two ways. If the  sample from an individual bottle  filters  easily, then more than one sample bottle
(individual grab) may be  filtered through the same filter paper. In the case of the one-hour
composites, two grab samples (two collected per hour) may be filtered together, yielding a single
                                           41

-------
flow weighted composite result. The same approach may be used for the eight hour composite,
which will consist of four sample bottles (one every two hours) instead of two bottles. In this
approach, the total mass of dry solids measured on the filter(s) will be divided by the original
sample volume (without rinseate volume) of the two or four bottles to determine the TSS and
SSC concentration.  The alternative, if only one vial of sample (individual  grab) can be passed
through a filter, will be to filter each grab sample individually. The dry weight of solids from the
individual samples will be added together and the total dry solids  weight  divided by the total
sample volume (of two or four vials) to calculate the TSS concentration.

The samples for phosphorus (total and reactive) will be collected in  250-mL HDPE bottles (pre-
rinsed with acid to ensure that the bottle is not a source of the phosphorus).  Table 5-2 shows the
bottle types, sample size, and preservation required for each parameter.

The sample bottles  required for the various analyses will  be provided by  the PSH laboratory.
The bottle will come with preservative in the bottles and labeled  by  analysis type. The PSH
testing laboratory is in the same building as the chemical laboratory.  Given the proximity of the
PSH physical and chemical laboratories, samples will be hand delivered to the laboratory log in
desk with appropriate chain of custody forms.  The samples will  be  logged in and placed in
refrigeration as needed. Because of the proximity  of the labs,  coolers with ice to maintain
temperature will not be needed for interim storage or transport.

Chain of Custody will be maintained for all samples collected during the verification test.  The
unit operators who are responsible for sample collection will fill out a chain of custody form (See
example in Appendix B) for each set of samples. The form will be signed and dated for each set
of samples delivered to the PSH laboratory.  The receiving technician will acknowledge receipt
of the samples by signing the chain of custody and providing a copy of the form to the sample
delivery person.   All project  approval and chain of custody records will be maintained by the
physical laboratory  and by the chemical laboratory  for all samples.  Copies of the completed
project  approval  and chain  of custody forms will be included  with  all laboratory  reports
transmitting final analytical results.

6.3.2   Analytical Methods

Analytical methods used during the verification test will be EPA approved methods or methods
from Standard Methods for the Examination of Water and Wastewater, 20th Edition, while the
SSC analyses  will  be performed  in accordance  with  an American Society  for  Testing and
Materials (ASTM) approved method.  Table 6-1 shows the analytical methods that will be used
for the verification test and the typical detection limits that are achieved by these methods.

6.3.3   Analytical Quality Control

The quality control procedures for blanks, spikes, duplicates, calibration of equipment, standards,
reference check samples and other quality control measurements will follow the guidance in the
EPA methods, the PSH SOP's, and the PSH Laboratory Quality Assurance Manual.  Table 6-2
shows the frequency of analysis of various quality control checks.   Table 6-3 shows the quality
control limits that will be used by the laboratory  for these analyses and to ensure compliance
                                           42

-------
with the DQI for accuracy and precision.  Field and laboratory duplicates will be performed at a
frequency of one duplicate per ten samples collected.   Samples will be  spiked for accuracy
determination at a frequency of one  sample per fifteen samples analyzed by  the  laboratory.
Accuracy and precision will be  calculated for all data using the equations  presented in Section
6.1.


Table 6-1. Analytical Methods, Reporting Limits, Container Type, and Holding Times
Constituent
ssc
TSS
COD
PO4-P
PSD
Method No.
ASTM D-
3977
EPA 160.2
EPA 4 10.4
SM 4500-P
SM 2560
Method
Detection
Limit
5mg/L
5mg/L
3mg/L
0.2 mg/L
N/A
Lab Reporting
Limits
5 mg/L
5 mg/L
3 mg/L
0.2 mg/L
1,000
particles/mL
Container
Type
500-mL HOPE
500-mL HOPE
Amber Glass
HOPE or
Amber Glass
HOPE
Max.
Holding
Time
7 days
7 days
28 days
7 days1
28 days1
1 Because of the concern of bacterial growth in the samples, analysis will be completed within 48 hours, although
the method allows for a holding time of 28 days.
                                            43

-------
Table 6-2.  Summary of Calibration Frequency and Criteria
     Analyte
      Calibration
     QC Frequency
            Acceptable Limits
TSS and SSC
Particle Size
Distribution
PO4-P
Calibrate balance daily
NIST traceable weights
QC standard each run
Blank
Calibrate Coulter Counter QC standard run (as
daily and with every     standard addition) every
change of aperture tube.  10 samples.
QC std within supplier specifications
Blank < RDL

QC std within supplier specifications (median
particle size within 0.5% of manufacturer's
specification)
COD
Calibrate at start of
each run
Check calibration after
every 10 non-calibration
analyses
Calibrate at start of
each run
 Check calibration after
every 10 non-calibration
analyses
Initial Calibration:        Continuing:
Check:                   CCV ±10% of Theoretical value
 mid-range standard from   Blank 0.995
 Blank 
-------
Table 6-3. Summary Of Analytical Accuracy and Precision Limits
Sample
Matrix
Water




Solids
Analyte
TSS
ssc
PSD
TP, RP
COD
TCLP
Total Solids
Reference
Method
EPA 160.2
ASTMD-3977
N/A
SM 4500-P
EPA 4 10.4
SW 846-13 11
Accuracy
(% Recovery)
N/A
NA
N/A
80-150
80-120
Varies by matrix
N/A
Precision
RPD
0-30
0-30
N/A
0-10
0-20
0-30
N/A - Not applicable
Laboratory blank water of known quality will be used for all laboratory analyses and water for
final sample bottle rinsing for the TSS analysis. If contamination is detected in the blank water,
the analysis will be stopped and the problem corrected. Laboratory blanks, method blanks and
any other blank water data must be reported with all analytical results. One set  of field blanks
will be prepared and analyzed to verify bottle cleanliness and sample handling in the physical
lab. One complete set of bottles (for all analyses) will be filled with distilled or deionized water
and submitted  for analyses.  Travel blank  samples will be collected randomly  and sent with
samples to be analyzed at the subcontract laboratory.

Laboratory control samples  where  applicable will be used  to  verify that the methods are
performing properly. The control  samples  will be  blank  water spiked with  constituents  from
standards obtained from certified source material. Lab control samples will be carried through
the entire analysis including the digestion step in the case of the solid matrix.

Calibration for the various  analyses will  be  based on  a confirming  minimum  three-point
calibration curve in the  linear range of the method and instrument as detailed in  the SOPs. The
calibration sequence includes a method blank, three-five point calibration curve,  and a standard
check sample prepared from a secondary source, which must be within the limits shown in Table
6-2. The calibration is checked after each group of ten samples. If the calibration check results
fall outside the acceptance criteria, the instrument is recalibrated and the affected samples are
analyzed again. Table 6-2 provides calibration information and other run sequence information.

Balances  are  calibrated each day with NIST  traceable  weights.  A calibration  logbook is
maintained to demonstrate the balances are accurate.

6.3.4   Data Reduction, Handling, and Reporting

All analytical results will be reported in standard units of mg/L, ug/L, mg, grams,  etc. Flow rates
and volumes will be reported as gallons and gallons per minute. Analysis of  solids  will clearly
indicate if the concentration is on a dry weight or weight basis.
                                           45

-------
6.3.4.1    Documentation

All of the field and laboratory activities will be thoroughly documented by the use  of field
logbooks, project approval/chain of custody sheets, laboratory notebooks and bench sheets, and
instrument records.

A field logbook will be maintained at the PSH laboratory. Daily activity entries will be made in
the logbook documenting operating conditions, observations, and maintenance activities, if any
are needed. Each sample collected will be  noted  in  the  logbook  and any  other pertinent
information will be recorded. Completed pages in the logbook will be signed and dated.

Original  project approval  and chain of custody forms will accompany all sample(s) sent to the
chemical laboratory and will be maintained by the TO. The laboratory will produce a final data
report that includes all chemical test results, physical measurements, QA/QC data for blanks,
accuracy (recovery), and precision (percent difference), and lab control or matrix check samples.
Any deviations from the  standard protocols will  be discussed in  a narrative, any data that does
not meet the QA/QC requirements will be flagged, and  a narrative will be prepared discussing
the findings of any corrective action.

The laboratory will  maintain all logbooks, bench sheets,  instrument printouts, etc. in accordance
with the  PSH laboratory  QA/QC Manual. The QA/QC or Laboratory Coordinator will  make
these records available for inspection upon request.

6.3.4.2    Document Handling

During the test period the original field logbook  will be  kept at the physical laboratory.  At the
end of the test period, the original logbook will be sent to the NSF VO manager for storage in a
secure central project file. Original laboratory data reports with the original  project  approval
forms and chain of custody will be placed in the central project file at PSH. Copies of these
reports and any electronic data will be sent to the Project Manager (TO) and QA/QC officer for
review. Other copies of the data or logbooks may  be distributed to other project team members.

6.3.4.3    Data Reduction and Validation

All measurements and analytical  results will be reported in units that are consistent with the
methods  used and  as  shown in Table  6-4. The laboratory analysts will record raw data in
laboratory  notebooks or bench  sheets  using  standard  formats. Each analytical method will
contain instructions for recording and calculating the results. The laboratory  analyst will have
primary responsibility to  verify that the results recorded are accurate. Data review and QA/QC
review will be  the responsibility of the PSH laboratory staff following the PSH standard data
review and verification  procedures for the laboratory.  Data transcribed  for  entry  to  a
computerized database  will be checked against the lab bench sheets or instrument printouts by a
second person. The  same procedure will be followed for any electronic reporting of data, such as
the Excel spreadsheet that is required for final data submittal. The final data report will be signed
by an authorized laboratory manager/supervisor in accordance with laboratory policy.
                                           46

-------
The final data reports and electronic data received by the project team from the laboratory will be
100% checked. The Project Manager (TO) or designee will cross check 100% of the data in the
final reports from the laboratory with a printout of the spreadsheet provided by the laboratory.
The QA/QC officer for the VO will  review the final data reports  and all QA/QC information.
The QA/QC officer will issue a QA/QC review report discussing the quality of the data, how it
compares to the Data  Quality Objectives, and any data  that should be flagged as  invalid or
questionable. The VO Project Coordinator will back check 100% of the draft verification  report
data tables and calculations with the laboratory data and spreadsheets provided by the TO.

6.4    Assessments

The  project QA/QC  officer  or a designee will be  responsible  for making announced  and
unannounced laboratory  audits  to observe  adherence to the cleaning/operational  protocols,
sample collection methodology, sample handling practices, and analytical procedures detailed in
the test plan. The QA/QC Officer will review logbooks and final data reports to ensure that these
records  meet the DQI requirements and other  requirements for the test plan.  The Project
Manager (TO) or a designee and the QA/QC Officer (part of the TO team) will validate data, as
it is received from the laboratory.

The PSH laboratory has an assessment program  consisting of internal audits, while the NSF
laboratory has  an assessment program that includes internal and external audits, Quality reports
to management, and other internal checks are part the system used to ensure the NSF QA/QC
procedures are being implemented and maintained. The NSF assessment procedures will be part
of the QA/QC program  and will be followed  during the  time the  analytical work is  being
performed for the verification test.

At least one audit will be conducted by the VO during the test. The audit(s) will be to observe the
sample collection procedures being used,  to observe operation  of the unit, condition of the  test
site, and to review the sampling logbook(s). A written report will be prepared by the auditor  and
submitted to the QA/QC Officer and the Project Coordinator.  At least one lab audit will be
performed during the test to observe sample receipt, handling, storage, and to confirm that the
proper analytical methods, QA/QC procedures and calibrations are being used.

6.5    Corrective Action

Testing-related activities that  could  require corrective action include  problems with sample
collection, labeling, and improper entries  or missed entries in logbooks or operational problems
with the unit. The primary person responsible for monitoring these activities will be Brad Mikula
with audits by the NSF designated staff.  If a problem occurs,  the problem  will be noted  in the
sampling logbook and Mr. Mikula will notify the VO in all cases and the vendor in the case of
Up-Flo™ Filter unit operating issues. The problem, once identified will be corrected. If a change
in sampling protocol  related  to  sample  collection or handling is  needed, the change will  be
approved  by the VO  Project  Manager. All corrective  action required  will be thoroughly
documented and discussed in the verification report.

Laboratory corrective action will be taken  whenever:
                                           47

-------
    •   There is a non-conformance with sample receiving or handling procedures;
    •   The QA/QC data indicates any analysis is out of the established control limits;
    •   Audit findings indicate a problem has occurred; and/or
    •   Data reporting or calculations are determined to be incorrect.

 The PSH laboratory has a formal Corrective Action Plan as part of the QA/QC Manual. These
 procedures will be followed including notifying the laboratory QA/QC Manager and the TO's
 QA/QC Officer.  All corrective action will be thoroughly documented and reported to the Test
 Organization.  All data impacted  by  a correction will be so noted and a discussion  of the
 problem and corrective action will be included with the data report.

All corrective actions, either in the testing laboratory or in the analytical  laboratory, will be
reported to the  VO Project Coordinator.  The VO will review the cause of the problem and the
corrective action taken by the TO.  The review will include consideration of the impact of the
problem on the integrity  of the test and make a  determination if the test can continue or if
additional action is needed.  Additional  action could include adding additional days  to the test
period, re-starting the test at day one, or other appropriate action as determined by the VO. The
VO will respond to any  notification of corrective action within twenty-four  hours of being
notified of the problem. This response can be to continue the testing, cease testing until further
notice, or other appropriate communication regarding the problem. The response by the VO will
be in writing by email, fax, or letter.
                                           48

-------
                                       Chapter 7
                          Data Management and Analysis

Several types of data will be collected or generated during the testing periods of this test plan.
Quantitative data, including flow data, influent and effluent water quality data, type and amount
of residuals generated, etc.,  will be measured and reported by the laboratory. Qualitative data
describing the setup, operation, and maintenance of the Up-Flo™ Filter unit will collected in the
laboratory  throughout  the test period.  All  of this information will be managed  during the
verification using methods outlined in this section.

7.1    Data Management

The data being collected during this verification will include both manual and electronic data
collection and  storage methods.  Laboratory notebooks will be maintained to document all
activities related  to the  sampling,  operation, and  maintenance activities  at the site,  and to
document sample handling, equipment calibrations, and other related activities in the laboratory.
Laboratory results will be reported in paper reports showing all of results and QA findings for
each set of data. These results will then be entered into Excel spreadsheets for ease of analysis
and storage.

All samples collected in the laboratory will be assigned a specific identification number that will
be used to track and record the data throughout the collection, analysis, and data reporting steps.
The numbering system will include the use of an identifier for the test phase associated with the
sample (characterization  or verification), an identifier of sample type (solid, liquid, residual),
sample location (influent, effluent) and the date of collection. The sampling personnel will assign
the sample  number for all samples collected on-site. The samples collected will have a clear label
with the sample number and date on the label. The project approval form  and/or chain of custody
sheet  accompanying the sample(s) from the test lab to the analytical laboratory will also show
this sample identification number. The analytical laboratory will also be  generating samples and
sub-samples during the test.  The analytical laboratory  will assign unique identification numbers
to these sub-samples that will clearly identify their nature and will tie back directly to the  sample
identification assigned in the testing laboratory. The laboratory data reports will show the  sample
identification numbers and will include copies of the project approval and chain of custody forms
that clearly track the sample  names from their assignment in the field through  the analysis in the
laboratory.

7.1.1   Manual Data Collection

All data collection, observations, and sample records will be written in a logbook maintained at
the site by sampling personnel. Copies of these records will then be reviewed by  the  Project
Manager (TO) or a designee to ensure the records are being properly maintained. At the end of
the verification test, the sampling log will become part  of the permanent record.

The laboratory will use laboratory notebooks to record all manual data and related information in
accordance with good laboratory practice and the laboratory QA/QC and SOP documents. The
                                           49

-------
laboratory logbooks will be available for review by the Quality Assurance Officer or Project
Coordinator at any time.  The analytical  laboratory will  be responsible  for maintaining and
archiving the notebooks and manual records that support the data reported by the laboratory. The
original project approval and chain of custody records and any appropriate supporting documents
will be provided with the data reports. The data reports will  include a discussion of any problems
that occurred during the analysis, corrective action taken, and any other factors that could impact
the data.  The  laboratory reports  will include  all  QA/QC  results,  including blanks, spikes,
duplicates, check samples, etc.,  such  that the Quality Control Officer can validate the data and
make an independent opinion as to the quality and acceptability of the data.

7.1.2   Electronic Data Collection

The laboratory will provide the analytical results in both  hard copy reports and in  electronic
format.  The data will be entered into  an Excel spreadsheet  in a format that will be finalized and
provided by the laboratory coordinator. The laboratory will verify the data in the spreadsheet by
comparing a print out of the  spreadsheet with the hard copy results  and their  supporting
documents prior to release of the data.

Upon receipt of the laboratory reports and  spreadsheets, the Project Manager (TO), QA Officer
or their designee will verify the accuracy of the data. A direct comparison of the hard copy data
and the  electronic spreadsheet will be  made. Any corrections required will be written on the print
out of the spreadsheet and the corrections made to the spreadsheet.

7.2    Data Analysis and Presentation

All results, including statistical  analysis, will  be provided  in the verification report.  Any data
that was excluded in statistical analysis will be reported with an explanation as to why it was not
included in the analysis.  The  data  obtained during verification testing will  be statistically
analyzed, reduced, and presented in tables, graphs and charts.  All raw data will be included as an
appendix to the verification report.  The statistical methods and any statistical programs used will
be described in the verification report. A detailed discussion of the results will accompany the
tables, graphs and/or charts and shall be presented in the  verification report (see Section 7.3).
Conclusions drawn from  the analysis of the  test  results will be presented  in the verification
report.

7.2.1   Flow Data

Flow  data will be collected by the physical  laboratory during all four phases of verification
testing.  The total flows and flow rate for each Phase, day, or activity will be summarized in  a
spreadsheet.  The results  will be  presented  in  the  final  report as a table showing average,
maximum and minimum daily flow.

7.2.2   Treatment Performance Quality Data

Valid challenge water quality data obtained during the verification test will be analyzed and
presented as follows:
                                            50

-------
   •   Tables showing the  average, maximum  and minimum influent concentration for the
       sampling events for the target contaminate list;
   •   Tables showing the  average, maximum  and minimum effluent concentration for the
       sampling events and removal efficiency for the target contaminate list;
   •   Table(s) showing the mass of the residual stream.

7.2.3   Operations and Maintenance Parameters

Results of monitoring operation and maintenance parameters during verification testing shall be
presented in a discussion format. The verification report will include a thorough discussion of
any difficulties encountered in operating  or  maintaining the unit during the verification test.
Discussion will  include observations regarding the ease/difficulty of installation, and factors,
such as operator training, presentation clarity in the O&M manual, etc.

7.2.4   Equations

The data analysis will include the calculations of removal efficiency and various statistics.  The
equations to be used in the data analysis are provided below.

7.3    Verification Report

The verification report will be a document  containing all  raw and analyzed data, all QA/QC data
sheets, a description of all types of data collected, a detailed description of the testing procedure
and methods, results and QA/QC results.  The Report will thoroughly present and discuss the
findings  of the verification test. Conclusions  regarding the performance of the Up-Flo™ Filter
will be made and compared with the performance goals for the verification test.

It is expected that the verification report will contain the  following main sections. There may be
some deviation from the order given below in order to present the findings in a clear and precise
manner. Additional sections will added as needed to properly present all of the findings.

       •  Verification Statement
       •  Preface
       •  Glossary
       •  Acknowledgements
       •  Executive Summary
       •  Introduction and Background
       •  Procedures  and Methods Used  In  Testing (summarizing  essential information from
          the test  plan)
       •  Results  and Discussion
       •  Limitations
       •  Conclusions
       •  Recommendations
       •  References
                                           51

-------
•  Appendices
      Raw Data
      Special Laboratory Procedures - Standard Operating Procedures
      QA/QC Manual/Procedures
      O&M Manual
      Sampling logs and supporting documentation as appropriate
                                   52

-------
                                     References
1.  NSF International, Protocol for the Verification of In-Drain Treatment Technologies, April
   2001, Ann Arbor, Michigan.

2.  United States  Environmental  Protection Agency: Environmental Technology  Verification
   Program - Quality and Management Plan for the Pilot Period (1995 - 2000), EPA/600/R-
   98/064, 1998. Office of Research and Development, Cincinnati, Ohio.

3.  NSF  International, Environmental Technology  Verification -  Source Water  Protection
   Technologies Pilot Quality Management Plan, 2000. Ann Arbor, Michigan.

4.  United States  Environmental  Protection Agency: Methods  and Guidance for Analysis of
   Water, EPA 821-C-99-008, 1999. Office of Water, Washington, DC.

5.  United States Environmental Protection Agency: Methods for Chemical Analysis of Water
   and Wastes,  Revised March 1983, EPA 600/4-79-020.

6.  United States Environmental Protection  Agency: Test Methods for Evaluating Solid Waste:
   Physical/Chemical Methods 3rded- 4 vols.,  November 1986, Final Update IIB and Proposed
   Update III, January 1995.

7.  APHA, AWWA, and WEF: Standard Methods for  the  Examination  of Water  and
   Wastewater, 20th Edition, 1998. Washington, DC.

8.   United States Environmental Protection Agency:  EPA  Guidance for Quality Assurance
   Project Plans,  EPA  QA/G-5,   EPA/600/R-98-018,  1998.  Office  of  Research  and
   Development, Washington, DC.

9.  United States Environmental Protection  Agency, Guidance for the Data Quality Objectives
   Process, EPA  QA/G-4, EPA/600/R-96-055, 1996.  Office of Research  and Development,
   Washington, DC.
                                         53

-------
                                       Glossary

Accuracy - a measure of the closeness of an individual measurement or the average of a number
of measurements to the true value and includes random error and systematic error.
Bias - the systematic or persistent distortion of a measurement process that causes errors in one
direction.
Commissioning - the  installation  of the in-drain treatment technology and start-up of the
technology using test site challenge water.
Comparability - a qualitative term that expresses confidence that two data sets can contribute to
a common analysis and interpolation.
Completeness - a qualitative term that expresses confidence that all necessary data have been
included.
Precision - a measure of the agreement between replicate measurements of the same property
made under similar conditions.
Protocol - a written document that clearly states the objectives, goals, scope and procedures for
the  study. A protocol shall be used for reference during vendor participation in the verification
testing program.
Quality Assurance Project  Plan - a written document that describes the implementation of
quality assurance and quality control activities during the life cycle of the project.
Residuals - the waste streams, excluding final  effluent, which  are retained by  or discharged
from the technology.
Representativeness - a measure of the degree to which data accurately and precisely represent a
characteristic  of a  population  parameter  at  a  sampling  point,  a  process   condition,  or
environmental condition.
Stakeholder Advisory Group - a group of individuals consisting of any or all of the following:
buyers and users of in drain removal and other technologies, developers and vendors, consulting
engineers, the finance and export communities, and permit writers  and regulators.
Standard Operating  Procedure - a written  document containing specific procedures and
protocols to ensure that quality assurance requirements are maintained.
Technology Panel -  a group  of individuals with expertise and knowledge of in drain treatment
technologies.
Testing Organization - an independent organization qualified by the Verification Organization
to conduct studies and testing in accordance with protocols and test plans.
Vendor - a business that assembles or sells in drain treatment equipment.
Verification - to establish evidence on the performance of in drain treatment technologies under
specific conditions, following a predetermined study protocol(s) and test plan(s).
Verification  Organization  -  an  organization qualified  by EPA  to   verify  environmental
technologies and to issue verification Statements and verification reports.
                                           54

-------
Verification Report - a written document containing all raw and analyzed data, all QA/QC data
sheets, descriptions of all collected data, a detailed description of all procedures  and methods
used in the verification testing, and all QA/QC results. The test plan shall be included as part of
this document.
Verification  Statement  - a document that summarizes the verification report reviewed and
approved and signed by EPA and NSF.
Verification Test Plan - A written document prepared to describe the procedures for conducting
a test or study according  to the verification protocol requirements for the application of in drain
treatment technology. At a minimum, the test plan shall include detailed instructions for sample
and data collection, sample handling and preservation,  precision, accuracy, goals, and quality
assurance and quality control requirements relevant to the technology and application.
                                           55

-------
                                 Appendices
A     Up-Flo™ Filter O & M Manual
B     Chain of Custody Form
                                      56

-------