Owners and operators of
   regulated underground
storage tanks (USTs) on tribal
   lands must comply with
  federal UST regulations.

 This compliance assistance
  brochure highlights best
  management practices for
     recordkeeping and
        notification.

  Note: This document is a
     resource to promote
  compliance and does not
  replace the federal UST
        regulations.
    EPA developed this
  compliance assistance
   brochure to help UST
  owners and operators in
 Indian country comply with
the federal UST regulations.

  This brochure is one in a
 series of EPA compliance
   assistance brochures
  designed to help owners
 and operators comply with
     UST regulations.

 Other brochures focus on
   spill buckets, overfill
  protection, and tank and
  piping release detection.
                                       &EPA
                                       Office of Underground Storage Tanks
                                       www.epa.gov/oust
                                       March 2012
                                       EPA-510-F-12-002
                                            Compliance Assistance In
                                                Indian Country

-------
RECORDKEEPING

It is important to keep your
underground storage tank
(UST) records.
Recordkeepinq is an
important part of
maintaining your tank
facility. Make sure your
UST system records are
always readily available to demonstrate
compliance with the UST regulations.


What can you do to
demonstrate compliance with
the UST recordkeeping
requirement?

Release Detection
^ Release detection  determines whether
   your tanks and piping are leaking. Keep
   records to demonstrate you are
   maintaining release detection. The
   specific records to  keep depend on the
   type of release detection you use.
 'MONTHL Y TESTING:^
  Print out at least one
  passing leak test for
  each tank.

  ANNUAL TESTING:
  Keep the most recent
  line tightness testing
  result and line leak
  detection functionality
  test.

  INTERSTITIAL
  MONITORING:
  Keep a monthly log of
  interstitial monitoring
  results, if applicable.
Manually checking brine sensor
MM DD, YiTY  HH:MH XM

PRESSURE LIKE LEAK TEST
RESULTS

Q 1: UNLEADED REG LINE

3.0 GAL/KR RESULTS:

LAST TEST:
Hffl DD,Yt"iT HH:H
HUMBER OP TESTS PASSED
 PEEV 24 HOURS :  123
 EIMCE HIDHIGHT :   81

0.20 SSL/HR RESULTS:

HUH DD,YYYY HH:HH ZM PASS
HUH DD.TYYY HHrHH ZM PASS

0.10 GaL/HR RESULTS:


HUH DD.YYYY HH:MM XM PASS
HUH DB,YYYI SUM] M PASS
                        Leak test print out
                                                  Cathodic Protection
                                                  ^ A metal UST system is typically equipped
                                                     with either an impressed current or a
                                                     galvanic anode system. Ask the
                                                     installation contractor or review as-built
                                                     drawings to determine which type of system
                                                     you have.

                                                  ^ Keep records of system installation, triennial
                                                     testing, integrity assessments, and repairs
                                                     to help determine whether your system is in
                                                     compliance with the corrosion protection
                                                     requirements.
                                                  Steel tank with sacrificial
                                                  anode
                                                                       Impressed current rectifier

                                                  Others records to keep:
                                                  ^ UST system installation and repair for the
                                                     operating life of the UST system
                                                  ^ Permanent closure site assessment results
                                                     for at least 3 years
                                                  ^ Evidence of financial assurance mechanism
                                                     and current  certification of financial
                                                     responsibility
                                                  ^ Release detection equipment performance
                                                     claims for at least 5 years from  installation
                                                     and maintenance, repair, and calibration
                                                     records for at least 1 year
                                                  ^ Internal lining inspection results until the
                                                     next inspection
                                                                               NOTIFICATION

                                                                               It is important to remember that you are
                                                                               responsible for making sure that your
                                                                               implementing agency is aware of all regulated
                                                                               USTs that you own. The information you provide
                                                                               should be based on available records or
                                                                               historical knowledge.


                                                                               What can you do to demonstrate
                                                                               compliance with the UST
                                                                               notification requirement?

                                                                               UST Notification Form
                                                                               ^ Submit an UST notification form to your
                                                                                 implementing agency providing the most up-
                                                                                 to-date information regarding your UST
                                                                                 system, its location, and compliance with the
                                                                                 technical requirements of the UST
                                                                                 regulations.
                                                                                 Keep a copy of your
                                                                                 notification form for
                                                                                 reference.

^/
                   Submit a notification    »
                   form to your
                   implementing agency
                   within 30 days of
                   installing your new
                   UST.

                   Submit a notification
                   form to your
                   implementing agency
                   30 days before
                   permanently closing
                   your UST or
                   performing a change in
                   service.

                   Notify trie implementing
                   agency whenever you
                   change the product
                   stored in your UST.
                   Sv	S
REMEMBER
                                                                               Keep your records in
                                                                               organizers such as a
                                                                               tabbed three-ring binder or
                                                                               document holder.  This will
                                                                               help the inspection go fast-
                                                                               er and smoothly.
                                                                                                                                Sample organizer

-------