Transport Partnership
U.S. ENVIRONMENTAL PROTECTION AGENCY
Rail Partner 2.O.II Tool:
Data Collection Overview and
Workbook                ^^^S^
2011 Data Year - United States Version
Part 2                               MM
&EPA
United States
Environmental Protection
Agency

-------
Transport Partnership
U.S. ENVIRONMENTAL PROTECTION AGENCY
Rail Partner 2.O.II Tool:
Data Collection Overview and
Workbook
2011 Data Year - United States Version
Part 2
Transportation and Climate Division
Office of Transportation and Air Quality
U.S. Environmental Protection Agency
        United States                   Office ofTransportation and Air Quality
        Environmental Protection                         EPA-420-B-12-056
        Agency
                                            August 2012

-------
Introduction to Part 2:  DATA COLLECTION OVERVIEW AND
WORKBOOK

This guide is Part 2 of a three-part series to help trucking companies participate in the SmartWay
Transport Partnership.

In this guide you will learn about:

    1.  The general organization of the SmartWay Rail Carrier FLEET Tool, and
    2.  Data needs for each section of the tool.

You will also have the opportunity to collect your data using our data collection worksheets in
preparation for the data entry step (Part 3).

Please review this guide carefully BEFORE attempting to use the tool or enter data. Understanding the
data requirements and gathering all data in advance will save considerable time and frustration while
completing your tool submission.

If you wish to explore the Rail Carrier FLEET tool in preparation for joining the program, please review
Part 3: Data Entry Guide and return to this workbook to prepare for gathering your data.

In the event that you have a question about any of the data collection activities, you can contact
SmartWay Email Support at smartway  transport@epa.gov and a member of our SmartWay Partner
Support Team will assist you.

          WARNING!

          Completing the Rail Carrier FLEET tool requires a considerable amount of information about
          your company and the fleets/divisions that are joining SmartWay. There are multiple
sections and screens to complete for each fleet/division that you operate.

While you will have the ability to save your tool along the way and return to it at anytime, we
STRONGLY ENCOURAGE you to  review Part 1 to understand key information about joining the
partnership. Then, use Part 2 of this series to learn about the data requirements and gather your data
BEFORE attempting to use Part 3 to complete the tool.
                                                 Rail Carrier FLEET Tool Users Guide Part 2 I P. 3

-------
Overview of Data Collection  Requirements
The SmartWay Rail Carrier FLEET tool is the data collection and calculation system for rail carriers that
join the SmartWay Transport Partnership. There are four sections of the SmartWay Rail Carrier FLEET
Tool that require data about your company's operations:

    1.   Specify Official Partner Name
    2.   Enter Company Contact Information
    3.   Characterize Your Fleets/Divisions
    4.   Enter Activity and Fuel Information for Each of Your Fleets/Divisions

This guide will explore the data required for completing these four sections. Part 3 of the three-part user
guide series explains more about the structure of the tool and the data entry process; this guide will
focus primarily on what you need to do to prepare for completing the tool.

Section 1: Specify Official Partner Name

To begin, you must specify you company's Partner name, exactly as you want it to appear on the
SmartWay website. For example, if your company's name includes "Inc." or "Ltd.", you may choose not
to include that in your Partner name. Please also pay special attention to proper capitalization,
abbreviations, and punctuation.

Section 2: Enter Company Contact Information

SmartWay needs complete contact information for correspondence, web posting, press releases, and
awards and  recognition (where applicable).  The SmartWay tool asks for:

    •   General company information (e.g., location, web address, etc.)
    •   A primary contact1 for any questions about your company's participation and tool submissions
    •   An executive contact2 for participation in awards and recognition events
    •   Additional contacts (optional): Additional contacts may include your press/media contact, your
        fleet/division manager, etc.—anyone who is not the primary contact for tool and participation
        issues but may be involved in your involvement with SmartWay.

Please use Worksheet #1 in this guide to prepare for filling out the Contact Information Screen in the
Rail Carrier FLEET Tool.
 The primary contact is the individual designated by the Executive Contact to directly interface with SmartWay regarding specific tasks
involved in the timely submission of the tool. The Primary Contact is responsible for coordinating the assembly of information to
complete/update fleet/division data; completing and updating the tool itself; maintaining direct communication with SmartWay; and keeping
interested parties within the company apprised of relevant developments with SmartWay.) NOTE: To ensure that emails from SmartWay/EPA
are not blocked, new primary contacts may need to add SmartWay/EPA to their preferred list of trusted sources.)

 The executive contact is the company executive who is responsible for agreeing to the requirements in the SmartWay Partnership
Agreement, overseeing the Primary Contact (as appropriate), and ensuring the timely submission of the tool to SmartWay. The executive
contact also represents the company at awards/recognition events. This person should be a Vice President or higher level representative for
the company.
                                                      Rail Carrier FLEET Tool Users Guide Part 2 I  P. 4

-------
Section 3:  Characterize Your Fleets/Divisions

The SmartWay Rail Carrier FLEET Tool allows you to characterize your operations at the fleet/division
level. In the Rail Carrier FLEET tool, a fleet/division is defined as any business unit that a customer has
discretion to hire.

    •  If you are a small company (e.g., Class 3) you will only have one fleet/division
    •  If you are a large rail company (e.g., Class 1), you may have several fleets/divisions

NOTE: You may enter multiple fleets/divisions into a single tool submission.

SmartWay highly recommends developing your list of fleets/divisions offline using a company
organization chart or perhaps a customer interface webpage. The best strategy is to have a clear idea of
how to define your fleets/divisions before filling out the tool.

Your company's name and your fleet/division name(s) will be listed on the SmartWay website to
indicate your participation in the SmartWay Transport Partnership. Your shipper and logistics customers
can also use the SmartWay Online Database to search for your company by the name you submit in the
tool.

     j\   Therefore, it is critical that you identify your company and fleet/division(s) in the tool as
     !_j  you would have them appear on the SmartWay website.

The data requirements for the "Characterize Your Fleets" section are described below.

Please use the Worksheet #2 provided in this guide to prepare for filling out the Characterize Fleets
section in the Rail Carrier FLEET Tool.

NOTE: You may wish to print multiple copies of Worksheet #2 if you have multiple fleets/divisions.

Data Requirements for "Fleet Characterization" Screen

For each fleet/division, you will need to specify:

    •  Partner Name: On the SmartWay website, each of your fleet/division names will begin  with the
       name of your company. This fleet/division "prefix" will  be whatever you enter in the Partner
       Name field on the tool screen. By default, this field is automatically populated with the first 50
       characters of the Partner Name that is entered on the Home screen. You should specify the
       name so that it appears EXACTLY as it you want it to show within each fleet/division name.  (For
       example, if your company's name includes "Inc." or "Ltd.", you may choose not to include that in
       your fleet/division names.) Please pay special  attention to proper capitalization, abbreviations,
       and punctuation.

    •  Fleet/Division Identifier: Specify each fleet/division identifier exactly as you want it displayed
       on the SmartWay website, including proper  capitalization, any abbreviations, and punctuation.
       Remember that it will automatically be combined with the Partner Name field.

    •  Class: Enter the Class of the associated rail fleet/division (1, 2, or 3).

                                                   Rail Carrier FLEET Tool Users Guide Part 2  I P. 5

-------
       Fleet Contact: This contact should be one of the contacts you already identified in the Contact
       Information section as the contact for each fleet/division. NOTE: A drop-down menu in the
       tool will supply this information; if there is a contact for the fleet/division that is not already
       listed in the Contacts worksheet, you will need to go back to that screen to add the required
       contact information.
Section 4: Enter Activity and Fuel Information for Each of Your Fleets/Divisions

Once you have identified and characterized your fleets/divisions, you will be asked to provide additional
information for EACH fleet/division separately. Much of this information will be directly available for
Class 1 rail carriers from their most recent R-l report data.

         NOTE: If you are a new SmartWay partner you should enter the most recent 12 months of
         data into the tool.  If you do not have a full year of operational data, please collect a minimum
         of three months' data for input into the SmartWay tool. In your next update year, you will be
         required to submit a full year's data.

Data Requirements for "Power Units" Screen

Please use the Worksheet #3 provided in this guide to prepare for filling out the Power Units section
in the Rail Carrier FLEET Tool (make one copy for each fleet/division).

You will need to provide power unit information about the selected fleet/division.

       •      Specify the number of power units or hours per year operated during the
              reporting period,  by engine tier level.  Depending up the Data Input Method
              selected, this information may be broken out by line haul and switch engines.
              Under method 1 you may aggregate your fleet's line-haul and switch units together,
              while method 2 requires that you report the unit type counts separately.  Methods 3
              and 4 are similar, but require inputting hours of operation by tier, rather than unit
              counts.3 For Class 1 operators, please refer to Rl form, schedule 710 for details.  The
              different engine tier level definitions are provided below:

              o Non-tier - manufactured before 1972
              o Tier 0 - manufactured between 1972 and 2001
              o Tier 0+ - manufactured between 1972 and 2001, and  remanufactured after 2010
              o Tier 1 - manufactured between 2002 and 2004
              o Tier 1 - manufactured between 2002 and 2004 and remanufactured after 2010
              o Tier 2 - manufactured between 2005 and 2011
              o Tier 2+ - manufactured between 2005 and 2011 and remanufactured after 2013
              o Tier 3- manufactured between 2012 and 2014

       •      Next, enter your fleet's Total Locomotive Unit Miles/Year data under Part B. Break out
              your unit miles data by line haul and switching categories, as appropriate. This data is
              available in the R-l forms for Class 1 railroads (see lines 8-14 of Schedule 755).
3 In general, method 4 will provide the most accurate estimate for NOx and PM emissions.
                                                 Rail Carrier FLEET Tool Users Guide Part 2 I P. 6

-------
       •       Finally, you will need to provide a detailed description of the data sources used to
               obtain your power unit data (e.g., R-l Form section and line numbers).

Data Requirements for "Cars" Screen

Please use the Worksheet #4 provided in this guide to prepare for filling out the Cars section in the
Rail Carrier FLEET Tool (make one copy for each fleet/division).

You will need to provide power unit information about the selected fleet/division.

       •       Specify your fleet's annual railcar miles for the reporting year, by car type (e.g., box,
               gondola, etc.) and ownership type (Owned/Leased or Private). These data may be
               obtained from Rl Report Section 755  (see lines 15 - 84).

       •       If available, also provide your fleet-specific railcar volumes by car type.
Data Requirements for "Operations" Screen

Please use the Worksheet #5 provided in this guide to prepare for filling out the Operations section in
the Rail Carrier FLEET Tool (make one copy for each fleet/division).

You will need to provide power unit information about the selected fleet/division:

        •      Specify your fleet's annual fuel consumption and ton-mile data.  Record annual fuel use
              per year by fuel type (diesel, biodiesel, LNG, CNG, and electric) and train category
              (freight, passenger, and switch). Petroleum diesel, biodiesel, and LNG entries must be in
              gallons per year. Specify CNG units indicating standard cubic feet or gasoline-equivalent
              gallons per year. Electricity use is specified in kWh/year. If you indicate biodiesel
              consumption data, you must also specify the fleet average fuel blend level (between 0
              and 100). For Class 1 operators, please refer to Rl form, schedule 750, lines 1-3 for
              details.

        •      Specify your gross, revenue, and non-revenue ton-mile data, from Rl Report
              Section755, lines 104, 110, and 113, respectively.
                                                    Rail Carrier FLEET Tool Users Guide Part 2 I P. 7

-------
Worksheets for Data Collection
List of Worksheets




   #1: Contact Worksheet	8




   #2: Fleet/Division Characterization Worksheet	9




   #3: Power Units Information Worksheet	10




   #4: Cars Information Worksheet	11




   #5: Operations Information Worksheet	13
                                                Rail Carrier FLEET Tool Users Guide Part 2 I P. 8

-------
Worksheet #1: Company Contact Information
#1. Enter your Contact Information:




General Company Contact Information
Company Name
Headquarters
Mailing Address
City
Main Phone
Number


State/Province Zip Country
Toll-free Number Cell Web Address
number
Primary Contact Information
Primary Contact Name
Primary Contact Mailing
Address
City
Primary Contact Phone
Number


State/Province Zip Country
Email
Address
Executive Contact Information
Executive Contact Name
Executive Contact Mailing
Address
City
Executive Contact Phone
Number


State/Province Zip Country
Email
Address
Other Contact Information
Executive Contact Name
Executive Contact Mailing
Address
City
Executive Contact Phone
Number
Contact's role in program




State/Province


Email
Address
Zip Country


                                          Rail Carrier FLEET Tool Users Guide Part 2 I P. 9

-------
Worksheet #2: Fleet/Division Characterization
Complete this worksheet for each fleet/division you will be submitting in the Rail Carrier FLEET Tool.




Specify Company/ Division Name (exactly as it should appear on the SmartWay website):




Partner Name	




Fleet/Division Identifier	




Railroad Class (1, 2, 3)	
Fleet/Division Contact:.
                                              Rail Carrier FLEET Tool Users Guide Part 2 I P. 10

-------
Worksheet #3: Power Units Information
Complete this worksheet for each fleet/division you will be submitting in the Rail Carrier FLEET Tool.


Specify Power Unit Inventory by Engine Tier

Inventory Basis (circle one):   # Units        Hours/Yr

Engine Tier     Line Haul             Switch               Total*
non-Tier       	      	      	
0             	      	      	
0+            	      	      	
1             	      	      	
1+            	      	      	
2             	      	      	
2+            	      	      	
3
* If you cannot differentiate line haul and switch inventories, enter # Units or Hours/Yr for Totals only
Total Locomotive Unit Miles/Year:
Unit Trains
Way Trains           	

Through Trains       	

Train Switching       	

Yard Switching       	


Describe the data source used to develop the above data:
                                                Rail Carrier FLEET Tool Users Guide Part 2 I P. 11

-------
Worksheet #4 Car Data (page 1 of 2)
Complete this worksheet for each fleet/division you will be submitting in the Rail Carrier FLEET Tool.

Fleet/Division Name:	
Railcar Miles/Year:
                           Box-Plain 40'
                           Box-Plain 50'
                           Box Equipped
                           Gondola Plain
                         Gondola Equipped
                          Hopper Covered
                      Hopper Open Top - General
                       Refrigerated Mechanical
                     Refrigerated Non-Mechanical
                          Flat TOFC/COFC
                          Flat Multi-Level
                         Flat General Service
                           Flat All Other
                      Tank Under 22,000  gallons
                       Tank Over 22,000 gallons
                           All Other Cars
                 Work Equipment and Company Freight
                        No Payment Car-Miles
                                                            Owned and Leased
                                                         Loaded            Empty
        Private
Loaded
Empty
                                                                                                                               12 | P a g e

-------
Worksheet #4: Car Data (page 2 of 2)
For each fleet/division, enter the fleet-specific volume in cubic feet for each car type.  If you do not have this data,
the Rail Tool will apply national average volume estimates.
                                                         Volume (cu ft)
                   Box-Plain 40'
                   Box-Plain 50'
                   Box Equipped
                   Gondola Plain
                   Gondola Equipped
                   Hopper Covered
                   Hopper Open Top - General
                   Refrigerated  Mechanical
                   Refrigerated  Non-Mechanical
                   Flat TOFC/COFC
                   Flat Multi-Level
                   Flat General Service
                   Flat All Other
                   Tank Under 22,000 gallons
                   Tank Over 22,000 gallons
                   All Other Cars
                   Work Equipment and Company Freight
                   No Payment Car-Miles
                                                                                13 | P a g e

-------
Worksheet #5: Operations Data
Complete this worksheet for each fleet/division you will be submitting in the Rail Carrier FLEET Tool.
Enter Fuel Use/Yr:

 Fuel Type
 Diesel
 BiodieselA
 LNG
 CNG
 Electricity
* circle one
Units
gal/yr
gal/yr
gal/yr
gal/yr   cu ft/yr *
kWh/yr
Freight
Passenger
Switching
A Biodiesel blend % (if applicable):
Gross Ton-Miles/Yr

Revenue Freight Ton-Miles/Yr

Non-Revenue Freight Ton-Miles/Yr
                                     (Rl, Schedule 755, line 104)

                                     (Rl, Schedule 755, line 110)

                                     (Rl, Schedule 755, line 113)
                                                                               14 |  P a g e

-------
Next Steps

Now that you understand the data collection requirements for the SmartWay Rail Carrier FLEET Tool,
and you have collected the data you need in the worksheets, you are ready to download the tool and
begin the data entry process. Part 3 of the user guide series will guide you through the tool screens, and
help you enter the data and troubleshoot any problems you may have with your submission. Please visit
http://www.epa.gov/smartway/partnership/rail.htm to download Part 3: Data  Entry Guide and the Rail
Carrier FLEET Tool if you haven't already.
                                                                                15 | P a g e

-------