Protocol for Development of Test / Quality Assurance Plans for
           Validation of Ultraviolet (UV) Reactors
                       Prepared by
                   NSF International
              Under a Cooperative Agreement with


           U.S. Environmental Protection Agency

      Copyright 2010 NSF International - Limited permission is hereby granted to reproduce all or part
      of this work, subject to the limitation that users may not sell all or any part of the work and may
      not create any derivative work there from.

-------
July 2010
                                       Contents
Abbreviations and Acronyms	iv
Preface	v
1.0 Equipment Verification Testing Responsibilities	1
   1.1    Verification Test Site	1
   1.2    Roles and Responsibilities	1
     1.2.1  Validation Test Facility	1
     1.2.3  United States Environmental Protection Agency	1
2.0 Equipment Description	3
   2.1    General Information about the Reactor	3
3.0 Validation Testing Design	5
   3.1    Experimental Design	5
   3.2    UV Sensors Assessment	5
   3.3    Collimated Beam Bench Scale Testing	6
   3.3.1  Test Microorganisms (challenge)	7
   3.3.2  Test Conditions	7
   3.3.3  Test Apparatus	8
   3.3.4  Frequency of Testing	8
   3.3.5  Accuracy of Instruments	8
   3.3.6  Collimated Beam Procedure	9
   3.3.7  Collimated Beam Data Uncertainty	11
   3.4    Full Scale Testing to Validate UV Dose	12
   3.4.1  Evaluation, Documentation and Installation of Reactor	12
   3.4.2  Lamp Positioning and Burn-In Period	12
   3.4.3  Test Hydraulics: Equipment, Water Source and UV Absorbing Chemical(s)	13
   3.4.4  Test Conditions for UV Intensity Set-point	13
   3.4.5  Preparation of the Challenge Microorganisms	14
   3.4.6  Conduct Testing - Measuring UV Dose	15
   3.4.7  Test Conditions for UV Intensity Set-line or Multiple Set Points	16
4.0 Laboratory Operations Procedures	17
   4.1    Introduction	17
   4.2    Analytical Methods	17
     4.2.1  Sample Processing, and Enumeration of MS2:	17
     4.2.2  Percent UVT measurements:	18
   4.3    Analytical QA/QC Procedures	18
   4.4    Sample Handling	19
   4.4.1  Power Measurements	19
   4.4.2  Full Scale Test Controls	19
   4.4.3  Flow Rate	20
   4.5    Documentation	20
                                           11

-------
July 2010

5.0 Quality Assurance Project Plan	21
  5.1    Introduction	21
  5.2    Quality Assurance Responsibilities	21
  5.3    Data Quality Indicators	21
     5.3.1  Representativeness	21
     5.3.2.    Accuracy	21
     5.3.3  Precision	22
     5.3.4  Statistical Uncertainty	23
     5.3.5  Completeness	24
  5.5    Data Validation and Reporting	24
     5.5.1  Data Validation	24
     5.5.2  Data Reporting	25
  5.6    Testing Inspections	25
6.0 Data Management, Analysis, and Reporting	26
  6.1    Data Management and Analysis	26
  6.2    Work Plan	26
  6.3    Report of Equipment Testing and Performance	26
  6.3.1   Report Introduction	26
  6.3.2   Report - Reactor and Equipment Information	27
  6.3.3   Report Results, Calculations and Discussion	27
  6.3.3.1   RED Calculations	30
  6.3.3.2   Deriving the Validation Factor	31
  6.3.3.3   RED Bias and Factor	31
Attachment 1:	33
                                        Tables

Table 3-1. Target Dose for Collimated Beam Test Using MS2	8
Table 3-2. Test Conditions for Validation	14
Table 4-1. Analytical Methods for Laboratory Analyses	18
Table 6-1. Example UV Dose - Response Measurements from Collimated Beam Tests	29
Table 6-2. Flow Rate, UVT, Lamp Power, andUV Sensor Data during Test Runs	30
Table 6-3. Influent and Effluent Challenge Microorganism Concentrations	31
Table 6-4. Reference UV and Duty Sensor Checks	31
Table 6-5. Log Inactivation and RED Results	32

                                        Figures

Figure 3-1 Example  Set Line	17
                                          in

-------
 July 2010

Abbreviations, Acronyms and Definitions
(See also the EPA 's  "Ultraviolet Disinfection  Guidance Manual for the Final Long Term 2
Enhanced Surface Water Treatment Rule" for more abbreviations and acronyms common to UV
validation.)
ASTM       American Society of Testing Materials
ATCC       American Type Culture Collection
AWWARF   Water Research Foundation (formerly AWWA Research Foundation)
EC          Degrees Celsius
CFU         Colony Forming Units
cm          Centimeter
DWS        Drinking Water Systems
EPA         U. S. Environmental Protection Agency
ETV         Environmental Technology Verification
ฐF           Degrees Fahrenheit
HPC         Heterotrophic Plate Count
L            Liter
LEVIS        Laboratory Information Management System
mg          Milligram
mL          Milliliter
NaOH       Sodium Hydroxide
ND          Non-Detect
NIST        National Institute of Standards and Technology
nm          Nanometer
NSF         NSF International (formerly known as National Sanitation Foundation)
NTU        Nephelometric Turbidity Unit
NWRI       National Water Research Institute
PFU         Plaque Forming Units
psig         Pounds per Square Inch, Gauge
QA          Quality Assurance
QC          Quality Control
QA/QC      Quality Assurance/Quality Control
QAPP       Quality Assurance Proj ect Plan
QMP        Quality Management Plan
RED         Reduction Equivalent Dose
RPD         Relative Percent Deviation
SI           International Systems of Units
SOP         Standard Operating Procedure
TQAP       Test / Quality Assurance  Plan
TDS         Total Dissolved Solids
TSA         Tryptic Soy Agar
TSB         Tryptic Soy Broth
UV          Ultraviolet
UVT        Ultraviolet Transmittance
                                         IV

-------
 July 2010

	Preface and Scope


This document is an EPA Environmental Technology Verification (ETV) protocol (ETV UV
Protocol) for developing a test quality assurance plan (TQAP)  for ultraviolet (UV) disinfection.
The ETV UV Protocol was developed through the ETV Drinking Water Systems (DWS) Center
to clarify vague aspects of the EPA's "Ultraviolet Disinfection Guidance Manual for  the Final
Long Term 2 Enhanced  Surface Water Treatment Rule" (UVDGM-2006)   The   ETV UV
Protocol describes 1) the objectives of the testing, 2) test procedures,  calculations  and data
reporting, and 3) the quality assurance procedures and quality controls.

The experimental design in this EPA ETV UV Protocol conforms to the sample collection and
test procedures described in the EPA's "Ultraviolet Disinfection Guidance Manual for the Final
Long Term 2 Enhanced Surface Water Treatment Rule" (UVDGM-2006) for a single sensor set-
point control strategy.  This protocol also allows development of data for a "set line" control
strategy which is a series of three or more validated set points for a single reactor typically at
various flow rates.  For a calculated dose strategy, the user should read and follow section 5.10.2
Determining the Validated Dose and Operating Conditions for the Calculated Dose Approach in
the UVDGM-2006.

The UV reactor validation produced from testing per this ETV Protocol may be used for any of
the following potential applications:
   •   Determination of the log inactivation credit under the EPA Long Term 2 Enhanced
       Surface Water Treatment Rule (LT2ESWTR) for Cryptosporidium, Giardia and viruses
       (although an alternative to MS2 as a test microorganism may be needed to demonstrate
       greater than 21og reduction of adenovirus see section 3.3.1) in drinking water treatment.
   •   In the inactivation of microorganisms found in swimming pools, hot tubs and other
       recreational water facilities (not beach activity).
   •   In the treatment of water used in bottled water companies.
       	                                                         9
   •   To meet international norms of validated dose such as 40 mJ/cm .

Should the  UV reactor be used in the  applications stated above, it is recommended that the
materials  used  in  the  UV  reactor be safe  and  meet  health  affects  Standards  such  as
NSF/American National Standards Institute (ANSI) Standard 61 for drinking water and 50 for
recreational water equipment.

-------
 July 2010

	1.0 Equipment Verification Testing Responsibilities

 1.1    Verification Test Site
 UV dose validation testing shall be performed at a test facility/laboratory such that the testing equipment
 includes at minimum: injection pumps and ports to introduce the challenge microorganism, the
 ultraviolet (UV) absorbing compound; a means to remove a disinfectant residual in the feed water; flow
 rate control and a flow meter upstream and/or downstream of the reactor; and ensure that the water is
 well mixed before sampling (e.g., static mixers or appropriate number of pipe lengths with good mixing
 confirmed).

 1.2    Roles and Responsibilities
 The roles  and responsibilities of the validation testing facility, its credentials  and experience with UV
 validation, the vendor, and the EPA ETV Program shall be described.

 1.2.1  Validation Test Facility
 Validation testing should be performed by an independent third party organization or laboratory.  For
 testing under the Environmental Protection Agency (EPA) Environmental Technology Verification
 (ETV) Program, an independent third party performing the validation test and prepare the ETV
 verification report shall conform to the EPA ETV Program Quality Management Plan (QMP).

 Examples of independent third parties are those accredited by their respective nation's "accreditation
 bodies" to ISO Standards for independent third party testing organizations and certifiers:  ISO Guide 65
 and Standard 17025.  ISO Guide 65 contains the general requirements for bodies operating product
 certification systems. ISO 17025 contains the general requirements for the competence of testing and
 calibration facilities and organizations.

 All testing organizations and laboratories shall follow the procedures and adhere to the requirements of
 this ETV  protocol. The testing organization shall provide in the ETV TQAP and ETV Report the
 following information:
   •  Test site description including schematic of hydraulics laboratory and geographic location of the
       facility;
   •  Key personnel with identified roles and responsibilities related to the  validation and their
       experience (resumes may be included or provided upon request);
   •  Present accreditations of the test facility such as conformance to ISO  Standard 17025;
   •  Approximate  schedule for testing.

 1.2.3  United States Environmental Protection Agency
 The EPA provides leadership in the nation's environmental science, research, education and assessment
 efforts.  The EPA works closely with other federal agencies, state and local governments, and Native
 American tribes to develop and enforce regulations under existing environmental laws. The EPA is
 responsible for researching and setting national standards for a variety of environmental programs and
 delegates to states and tribes  responsible for issuing permits, and monitoring  and enforcing compliance.
 Where national standards are not met, the EPA can issue sanctions and take other steps to assist the
 states and tribes in reaching the desired levels of environmental quality. The EPA also works with

-------
July 2010

industries and all levels of government in a wide variety of voluntary pollution prevention programs and
energy conservation efforts.  The following are specific EPA roles and responsibilities:
       •  Quality Assurance (QA) oversight of ETV related activities;
       •  Technical review and QA oversight of Protocol ;
       •  Technical and QA reviews and approval of a vendor product test/quality assurance plan
          (TQAP);
       •  Direct the performance, at the EPA's discretion, of external technical systems audit(s) during
          the verification testing;
       •  Review draft verification reports and statements; and
       •  Final report approval and clearance for signature by the EPA Laboratory Director.

-------
 July 2010

	2.0 Equipment Description

2.1    General Information about the Reactor
The name of the company that makes and/or sells a UV reactor and the UV reactor's make and model
designation shall be identified in the TQAP. The company shall provide a description of the UV reactor
that includes the following information prior to the start of validation testing:
   •   The number of UV lamps;
   •   The number of sensors for the reactor (see information about UV sensors for minimum number
       of sensors per UV lamps);
   •   Control strategy (set point etc.);
   •   Alarms and alarm conditions;
   •   Provide schematics and drawings with parts and dimensions of the reactor, the sensors, the lamps
       the quartz sleeve placement and all wetted components; and
   •   Provide configuration of inlet and outlet (Z or L shapes etc.).

The following information should be provided with each UV reactor:
   •   Manufacturer/Supplier;
   •   Type, model, make and number;
   •   Year of manufacture;
   •   Maximum flow rate;
   •   Net weight;
   •   Volume;
   •   Voltage and phase;
   •   Power consumption;
   •   Lamp Life, ballast type,  lamp type, ignition type, lamp operation (constant output or variable);
       and;
   •   Power supply unit's name, make and serial numbers.

Information about the UV lamp sleeve:
   •   Type or model;
   •   Quartz or other material  type;
   •   Cleaning apparatus, procedure or system; and
   •   Pressure resistance.

Information about the UV sensor:
   •   Manufacturer;
   •   Type / model;
   •   Measuring field angle;
   •   Number of sensors per lamp and placement;
   •   UV emission spectrum measured in Watts at various wavelengths to demonstrate spectral
       response;
   •   Germicidal characteristics; and

-------
July 2010
Signal output range in mA (mV).Reactors shall have no less than one sensor per ten lamps if the UV
reactor uses low pressure (monochromatic) lamps and shall have no less than one sensor to one lamp for
UV reactors using medium pressure (polychromatic) lamps.

-------
 July 2010

	3.0 Validation Testing Design

3.1    Experimental Design
The goals and objectives of the validation shall be stated in the TQAP.  An example is the goal of
validation to achieve a 3 log inactivation of Cryptosporidium (See the Preface of this document for more
examples of goals or obj ectives of a validation).  A log inactivation goal of a target pathogen shall be
reasonably achieved with the test microorganism. For example, the use of MS2 to achieve a 4 log
inactivation of adenovirus would not be reasonable considering the instability of MS2 at the UV dose
sufficient to inactivate adenovirus greater than 2  log.

Once the goals and objectives are determined, this ETV  Protocol shall be used in creating the
experimental design that is described in the accompanying TQAP.  This ETV Protocol was  derived
from the EPA's UVDGM-2006 as desired by the ETV Drinking Water Systems (DWS) Center
stakeholders. A TQAP shall be developed based on the goals and objectives of the validation, data
quality objectives, the specific make and model of the vendor's reactor for validation and  other
information requested in this ETV Protocol.

The approach used in the UVDGM-2006 to validate UV reactors  is based on biodosimetry that shall be
used for this protocol. The biodosimetry approach determines the log inactivation of a challenge
microorganism during full-scale reactor testing for specific operating conditions of flow rate, UV
transmittance (UVT), and UV intensity (measured by the duty sensor).  Then a dose-response equation
for the challenge microorganism is determined using a collimated beam bench-scale test.  The observed
log-inactivation values from full-scale testing are input into the collimated beam derived-UV dose-
response equations to estimate a "Reduction Equivalent Dose (RED)".  The RED value is adjusted for
uncertainties and biases to produce the validated  dose of the reactor for the specific operating conditions
tested.

UV reactor validation follows these steps:
    1.  Assessment of the UV sensors,
   2.  Collimated beam laboratory bench scale testing,
   3.  Full scale reactor testing,  and
   4.  Calculations to determine the RED and then to adjust for uncertainty in UV dose, the validated
       dose.

3.2    UV Sensors Assessment
The test unit shall be evaluated according to the UV sensor requirements in the EPA's UVDGM-2006
prior to any verification testing or provide certificates from an accredited third party organization (see
Section 1.2.1 for examples) that the UV sensor met sensor requirements of other third party  consensus
standards.

All UV intensity sensors (duty and reference sensors) shall be calibrated in accordance with
ANSI/NCSL Z540-1-1994 and ISO/IEC 17025-2005 using reference standards traceable to the
International System of Units  (SI) through the National Institute of Standards and Technology (NIST) or
other recognized national laboratory, accepted fundamental or natural physical constants, ratio type of

-------
July 2010

calibration, or by comparison to consensus standards.  Evidence of calibration occurring within twelve
months prior to the start of testing shall be provided for all sensors

The technical specifications of the UV sensors and representations of their sensitivity to their germicidal
wavelength shall be provided in the TQAP.  Sensors shall be germicidal; have a spectral response that
peaks between 250 and 280  nm and has less than 10 percent of its total measurement due to light above
300 nm when mounted on the UV reactor and viewing the UV lamps through the water.

During validation testing, duty UV sensor measurements shall be measured to assure that the duty
sensors provided by the vendor shall be within ten percent of the average of two or more reference
sensor measurements.  Duty sensors that do not meet the data quality objective often percent shall be
replaced by the vendor. The replaced duty sensors shall have to be retested as described below.

The following steps shall be used to check the uncertainty of the duty and reference UV sensors used
prior to and at the end  of the validation testing:
   •  Step 1: Water shall be passed through the reactor at the maximum UVT and the maximum lamp
      power setting to be used during validation testing.
   •  Step 2: Using two, at a minimum annually, calibrated reference UV sensors; each reference
       sensor shall be  installed on the UV reactor at each port.  The UV intensity shall be measured and
      recorded. Note that should the reference sensors not agree with the calibration certificate-
       specified measurement uncertainty, they shall be sent back to the vendor for other conforming
      reference sensors. If the reference sensors are not within 10% of each other, the sensors will be
      replaced or sent for recalibration.
   • The above step shall be repeated using each duty UV sensor. If the UV reference and duty
       sensors can be  rotated, the minimum and maximum sensor readings shall be recorded across the
      complete range of rotation for each sensor.
   •  Step 3: Steps 1  and 2 shall be repeated at maximum UVT and lamp power decreased to the
      minimum level resulting in the minimum intensity expected to occur during validation testing
      with all lamps turned on.
   •  Step 4: For a given lamp output and UVT value, the difference between the reference and duty
      UV sensor measurements  shall be:
              The absolute value of [S duty/ S AvgRef- 1]
      Where:
          o   S duty =  Intensity measured by a duty UV sensor,
          o   S Avg Ref = Average UV intensity measured by all the reference UV sensors in the same
              UV sensor port with the same UV lamp at the same UV lamp power.

3.3   Collimated Beam Bench Scale Testing
The collimated beam procedure involves placing a sample with the challenge microorganism in a petri
dish  and then exposing the sample to collimated UV light for a predetermined amount of time.  The UV
dose is calculated using the measured intensity of the UV light, UV absorbance of the water, and
exposure time, see equation number one. The measured concentration of microorganisms before and
after exposure provides the "response," or log inactivation of the microorganisms from exposure to UV
light. Regression analysis of measured log inactivation for a range of UV doses produces the dose-
response curve.

-------
July 2010

Appendix C of the UVGM-2006 shall be used to conduct the collimated beam bench-scale testing and
produce a UV dose-response curve for the MS2 and other acceptable test organisms (see section 3.3.1 on
acceptable test microorganisms).  As Appendix C is guidance, the following sections describe the details
of the collimated beam testing.

Collimated beam tests shall be performed using two water quality conditions: the highest UVT and the
lowest UVT used in the full scale reactor test. At least one collimated beam test should be conducted on
each day of full-scale reactor testing using either the highest or lowest UVT.

3.3.1   Test Microorganisms (challenge)
The UVDGM-2006 allows for a variety of different target microorganisms for the estimation of log
reduction for Cryptosporidium and viruses. MS2 (ATCC 15597-B1) phage shall be used as the test
microorganism for the target pathogens, Cryptosporidium and Giardia. For other target pathogens such
as adenovirus, an alternative test microorganism may need to be used as MS2 is not suitable to
demonstrate a 4 log reduction at a 186 ml/cm dose. MS2 was selected for UV validation in drinking
water based on the following:
   •   The MS2 phage was selected as it is very reproducible between and within laboratories and it has
       a known record of ease of use and culturing.
   •   MS2 phage also has a well known quality control history and levels of acceptance are established
       such as the quality control boundaries in the National Water Research Institute/American Water
       Works Association Research Foundation "Ultraviolet Disinfection Guidelines for Drinking
       Water and Water Reuse,"  Second Edition, May 2003, Fountain Valley, CA (NWRI/AWWARF,
       2003).
   •   The MS2 phage is recommended for reactors  to validate to a dose such as 40mJ/cm2  commonly
       referenced in Europe and several USA States.

Other test microorganisms may be used only if a peer and drinking water stakeholder review accepts the
alternative test microorganism. Quality control and assurance data shall be included in any
documentation submitted for selecting an alternative challenge microorganism for UV validation. The
stability of the test organism used by the testing facility shall be established over at least a three week
period. At least one study on the variability associated within and between laboratories shall be
conducted and data submitted before consideration.

3.3.2   Test Conditions
The collimated beam test shall be performed at the  minimum and maximum UVT test condition. At
least one collimated beam test shall be performed during each day of the test.  See Section 3.4.4 for the
minimum and maximum UVT test condition. The water used for the collimated beam bench  scale
testing shall be the same water used for the full scale reactor testing.

UV doses shall cover the range of the targeted dose. Table 3-1 illustrates an example of the samples and
target doses for the MS2 phage plus a control (zero (0) UV dose) that will be produced in the study.

-------
July 2010
Table 3-1. Exam
Sample
LowUVT#l
Low UVT #2
Low UVT #3
Low UVT #4
Low UVT #5
Low UVT #6
High UVT #1
High UVT #2
High UVT #3
High UVT #4
High UVT #5
High UVT #6
pie Target Dose for Collimated Beam Test Using MS2
Log Inactivation
0 (control)
1.0
1.5
2.0
3.0
4.0
0 (control)
1.0
1.5
2.0
3.0
4.0
Target UV Doses (mJ/cm2)
Depending on objective, other
target doses may be appropriate
such as for viruses
0
20
30
40
60
80
0
20
30
40
60
80
3.3.3   Test Apparatus
The challenge microorganism's UV dose-response should be measured using a low pressure
(LP) collimated beam apparatus. An example of a LP collimated beam apparatus is provided in
Appendix V of the EPA's UVDGM-2006.

3.3.4   Frequency of Testing
The collimated beam bench-scale tests shall be performed for the challenge microorganism during each
day of testing in duplicate. A collimated beam bench scale test shall be performed using the highest and
one using the lowest UVT condition during the entire test.  Should the full scale testing be done in one
day, the highest and lowest UVT collimated beam bench scale tests shall be completed that day. All
collimated beam tests for a given test condition (highest or lowest UVT)  shall be run in duplicate.

3.3.5   Accuracy of Instruments
The accuracy  of  spectrophotometer measurements  of A254 shall be  determined using NIST traceable
potassium dichromate UV absorbance standards and holmium oxide UV wavelength standards on each
day of the test.  The measurement uncertainty of the spectrophotometer shall be ten percent or less from
the standards.  UV absorbance of solutions  used to zero the  spectrophotometer shall be verified using
reagent grade  organic-free water  certified  by the  supplier  to  have zero  UV  absorbance.  The
spectrophotometer shall be calibrated within  one month preceding the  start of testing.

Radiometers shall be calibrated according to  the following procedure to ensure that the
UV intensity is measured with an uncertainty of eight percent or less at a ninety five percent (95%)
confidence  level:
    1.  The radiometers used in the collimated beam tests shall come from the radiometer manufacturer
       with a certified uncertainty of eight percent or less at a 95% confidence level at the intervals
       suggested by the manufacturer.

-------
July 2010

   2.  The accuracy of the radiometer used to measure the UV intensity shall be verified at least at the
       beginning and the end of each collimated beam test session using a second radiometer.
   3.  The two radiometers shall have overlapping 95% confidence intervals of their respective
       measured readings and should read within five percent of each other. If the two radiometers do
       not read within five percent of each other or have overlapping 95% confidence intervals, a third
       radiometer shall be used to identify which radiometer is out of specification. The two
       radiometers with overlapping 95% confidence intervals of their respective measured readings or
       have readings within five percent of each other shall be used. If none of the radiometer readings
       match, at least two of them are likely out of calibration.
   4.  If the above criteria are met, the average radiometer measurement shall be used in calculations. If
       the criteria are not met,  the radiometers shall be sent for recalibration.
   5.  The radiometers shall also be checked to be sure that the irradiance measurement does not differ
       by more than five percent before and after UV exposure.

Radiometers shall also be calibrated by the radiometer manufacturer within one year of the start of
testing.

3.3.6  Collimated Beam Procedure
The laboratory shall collect a one liter sample from the influent sampling port of the biodosimetry test
stand for collimated beam testing.  One collimated beam test shall be performed in duplicate for each
day of the test. For the entire test,  one collimated beam test shall be performed using the highest and
lowest UVT test water.

Should a situation develop where a different batch (propagation) of challenge microorganisms is used,
UV dose-response curves shall be generated for each batch or propagation of the challenge
microorganisms.

Personnel shall perform the collimated beam tests with all standard safety precautions such as wearing
of goggles and latex gloves.  The skin of personnel shall be shielded from exposure to UV light.

The protocol for culturing MS2 and measuring its concentration will follow a double agar overlay
method described in Standard Methods 9224.

For collimated beam testing of a water sample containing challenge microorganisms, the laboratory shall
follow this procedure:
   1.  Measure the A254 of the sample.
   2.  Place a known volume from the water sample into a petri dish and add a stir bar. Measure the
       water depth in the petri  dish.
   3.  Measure the UV intensity delivered by the collimated beam with no sample present using a
       calibrated radiometer using a calibrated UV sensor.  The detector within the radiometer shall be
       placed at the same distance as the meniscus of the sample.
   4.  Calculate the required exposure time to deliver the target UV dose described in the next section.
   5.  Block the light from the collimating tube using a shutter  or equivalent.
   6.  Center the petri dish with the water sample under the collimating tube.
   7.  Remove the block of the light from the collimating tube and start the timer.
   8.  When the target exposure time has elapsed, block the light from the collimating tube.

-------
July 2010

   9.  Remove the petri dish and collect the sample for measurement of the challenge microorganism
       concentration. Analyze immediately or store in the dark at 4 ฐC (for up to 24 hours). (Should the
       laboratory perform a stability test to assess holding time and test water on infectivity of the
       phage, then the samples could be held for a longer tine for analysis.)  Plate each sample in
       triplicate, enumerate the plaques on each plate, calculate the concentration of phage in the
       starting sample and report each replicate plating.
   10. Re-measure the UV intensity and calculate the average of this measurement and the
       measurement taken in Step 3. The value should be within five percent of the value measured in
       Step 3. If not, recalibrate radiometer and re-start at Step 1.
   11. Using the equation described in the next section, calculate the UV dose applied to the sample
       based on experimental conditions which should be similar to the target dose.
   12. Repeat steps 1 through 11 for each replicate and target UV dose value. Repeat all steps for each
       water test condition replicate.

The collimated beam tests measurements shall produce:
                                r\
   •   UV Dose in units of mJ/cm ;
   •   Concentration of microorganisms in the petri dish prior to UV exposure (No) in units of plaque
       forming units (pfu)/mL; and
   •   Concentration of microorganisms in the petri dish after UV exposure (N) in units of Pfu/mL.

The UV dose delivered to the sample is calculated using the following equation:

             DcB = Es*Pf*(l-R)*[L*(l-10"A254'd)/(d + L)*A254*d*ln(10)]  *t           (Eq. 1)

       where:
             DCB = UV dose (ml/cm2)
             Es= Average UV intensity (measured before and after irradiating the sample) (mW/cm2)
             Pf = Petri Factor (unitless) (see Appendix C in UVDGM-2006 for procedure)
             R = Reflectance at the air-water interface at 254 nm (unitless)
             L = Distance from lamp centerline to suspension surface (cm)
             d = Depth of the suspension (cm)
             A254 = UV absorbance at 254 nm (unitless)
             t = Exposure time (s)

To control for error in the UV dose measurement, the variances of the terms  in the UV dose calculation
shall meet the following criteria (see Appendix C in UVDGM-2006 for details on calculation of
variances)
   •   Depth of suspension (d) ^ 10%

   •   Average incident irradiance (Es) < 8%

   •   Petri Factor (Pf) < 5%

   •   L/(d + L) < 1%

   •   Time (t) < 5 %

   •   (1 - 10-)/ad < 5%
                                               10

-------
July 2010


A regression analysis shall be used to develop each UV dose-response curve.  The regression analysis to
derive an equation that best fits the data shall involve forcing the fit through the origin. The laboratory
shall try both linear and a quadratic equations to determine the best fit of the data to a linear model.  The
test facility or laboratory shall then evaluate the equation's goodness-of-fit.  The differences between the
measured UV dose values and those predicted by the equation should be randomly distributed around
zero and not be dependent on UV dose. The test facility / laboratory shall establish the "goodness of the
fit" using standard statistical tests, such as examining the p-statistics for the regression coefficients.  The
regression coefficient, R , is acceptable if it is 0.9 or greater and for "r" +/- 0.95 or greater.  All data
shall be within the 95% confidence intervals of the regression curve.  The curve shall not be used to
predict values outside the range of the data. For MS2, the data shall be evaluated to and found to meet
the quality control requirements described in the NWRI/AWWARF, 2003.

3.3.7  Collimated Beam Data Uncertainty
Since the collimated beam data shall be fit to a linear or a polynomial regression, a 95-percent
confidence interval (UDR) shall be calculated:

              UDR = t * [SD/ UV DoseCB] X 100%                (Eq. 2)

       where:
              UDR= Uncertainty of the UV dose-response fit at a 95-percent confidence level
              UV DoseCB = UV dose calculated from the UV dose-response curve for the challenge
              microorganism
              SD = Standard deviation of the difference between the calculated UV dose response and
              the measured value
              t = t-statistic at a 95-percent confidence level for a sample size equal to the number of test
              condition replicates used to define the dose-response.

The UV dose-response curve for specific UVT of the test water shall be from the data produced during
each day of the full scale testing, (combined dataset) and used in the calculation of uncertainty.

Using Eq. 2 for calculating UDR, for each CB test before continuing, the data quality objective is  not to
exceed 30 percent at the UV dose corresponding to 1-log inactivation of the  challenge organism. Should
the UDR value be greater than 30 percent, the uncertainty shall be added to the total uncertainty of
validation as described in Section 6.

Analysis of regression coefficients indicates whether or not UV dose-response curves developed using
different water samples can be combined. The data from different days and different UVT shall not be
combined. In order for the UV dose-response curves to be combined,  differences between the regression
coefficients should not be statistically  significant at a 95-percent confidence level.  If differences in the
coefficients are statistically significant, the reason for this difference shall be documented.  Differences
between measured UV dose-response curves for different water samples could indicate one or more of
the following:
   •   The UV dose-responses of different batches of the challenge microorganism differ. In this case,
       the UV dose-response curve specific to each cultured batch of the challenge microorganism
       should be used to  assess UV dose delivery for the validation test conditions using that batch.
                                               11

-------
July 2010

   •   Interferences due to water quality; In this case,  the test facility / laboratory  shall mitigate the
       cause of the interference or account for the interference when assessing UV dose delivery for the
       validation test conditions.
   •   Errors calculating the UV dose delivered by the collimated beam apparatus.

If there are two or more UV dose-response curves from the same day of testing, the data shall not be
combined and the curve resulting in the most conservative (lowest) UV dose shall be used for
calculating RED values.

3.4    Full Scale Testing to Validate UV Dose
3.4.1   Evaluation, Documentation and Installation of Reactor
Prior to the start of validation testing, the testing facility shall confirm that the vendor met the
description and documentation requirements for equipment required in Section 2.0 of this document.
The UV reactor and the reactor inlet and outlet connections shall be installed at the laboratory in
accordance with the vendor's installation and assembly instructions. The piping shall be inspected to
ensure compliance with the vendor's specifications. The physical integrity of the UV reactor and the test
train shall be verified before testing.

3.4.2   Lamp Positioning and Burn-In Period
UV lamps shall undergo a minimum burn-in period of one hundred hours. The lamps shall be
repositioned in the reactor with the lamp with the highest output closest to the sensor as recommended in
Section 5.4.7 of UVDGM-2006.

The following procedure shall be used to determine the UV lamp output at the lowest and highest ballast
setting.
1. Install a lamp within a lamp sleeve located at the position nearest to the single UV sensor.
2. Pass water through the reactor at a constant (+/- 10%) flow rate, temperature and UVT.
3. With only the lamp under evaluation on, record the measured UV intensity.
4. Repeat the test for each lamp at each ballast setting.

To determine the rank of each lamp's output, use  the following process:
1.  Calculate the average of the measured UV intensity of all lamps at the highest ballast setting.
2.  Divide each lamp's measured UV intensity at the highest ballast setting by the average of the
   measured UV intensity of all lamps at the highest ballast setting.
3.  The result is a ranking of each lamp at the highest ballast setting.
4.  Repeat steps 1 through 3 above for lamps at the lowest ballast setting and determine the ranking of
   each lamp at the lowest ballast setting.
5.  To determine the final ranking of the lamps, take the rank of each lamp at each ballast  setting to
   determine an average ranking for each lamp's UV output.

For the full-scale reactor testing, the test facility / laboratory shall install the lamp with the highest
average output closest to the duty UV sensor. The remaining lamps shall be distributed randomly within
the reactor with respect to lamp intensity.
                                               12

-------
July 2010

3.4.3  Test Hydraulics: Equipment, Water Source and UV Absorbing Chemical(s)
Per Section 5.4 of the UVDGM-2006, the testing equipment needed for the conduct of a full scale
reactor validation "should include:
   •  Injection pumps and ports to introduce the challenge microorganism;
   •  The  UV absorbing compound, and, if needed, a disinfectant residual quenching agent into the
       feed water;
   •  Rate-of-flow control and a flow meter either upstream or downstream of the reactor; and
   •  A strategy to ensure that the water is well mixed before sampling (e.g., static mixers or
       appropriate number of pipe lengths with good mixing confirmed.

At least one ninety (90) degree elbow shall be fitted between the influent sample port and the inlet of the
UV reactor for testing to simulate worst case hydraulic conditions. At least one ninety (90) degree
elbow shall be fitted between the outlet of the UV reactor and the effluent  sample port to simulate worst
case hydraulic conditions. The test facility shall provide a detailed schematic of the validation facilities.
The  configuration of the inlet and outlet piping and other hydraulics of the test shall be fully described in
the TQAP and final report.

The water source for test shall be of potable water quality preferably municipal drinking water. The
water shall be de-chlorinated using activated carbon or a chemical that shall not affect the viability of
the test microorganism.  Proof shall be provided of viability integrity before use of chlorine neutralizing
chemicals.  See Section 4.4.2 for guidance on establishing stability and viability of test organisms.
When validating UV reactors using polychromatic output lamps, the quenching agent should not affect
by more than ten percent the spectral UVT from 200 to 400 nm when  compared to not using a
quenching agent.

The  chemical SuperHume™ should be used to lower the UV transmittance.  An alternative chemical
may be used to lower UVT, if when evaluated, meets the criteria in UVDGM-2006 including but not
limited  to absorption of UV over the spectrum pertinent to the type of UV lamp  (at 254nm for low
pressure) and has no effect  on the viability  of the  challenge microorganism.  The UVT  reduction
chemical shall be added to the  supply tank before each run or set of runs. The supply tank shall be well
mixed using a recirculating pump system.

By reference, the test equipment and design shall conform to the  specification described in the following
sections of UVDGM-2006:
   •  Microorganisms  and UV absorbing chemicals shall be mixed through the cross-section of the
       influent pipe - Section 5.4.3; and
   •  Sampling ports and points for microorganisms - Section 5.4.4.

3.4.4  Test Conditions for UV Intensity Set-point
This validation testing must determine the operating conditions under which the reactor delivers the
required UV dose for  treatment credit (see 40  CFR 141.720(d)(2)). The  operating conditions  shall
include  at a minimum the flow rate, UV intensity as measured by a UV sensor, and UV lamp status.

This approach relies on  one or more "setpoints" for UV intensity that are established during validation
testing to determine UV dose. During operations, the UV intensity as measured by the UV sensors must
                                               13

-------
July 2010

meet or exceed the setpoint(s) to ensure delivery of the required dose. Reactors must also be operated
within validated operation conditions for flow rates and lamp status [40 CFR 141.720(d)(2)]. In the UV
Intensity Setpoint Approach,  UVT  does not need to be monitored separately. Instead, the intensity
readings by the sensors account for changes in UVT. The operating strategy can be with either a single
setpoint (one UV intensity setpoint is used for all validated flow rates) or a variable setpoint (the UV
intensity setpoint is determined using a lookup table or equation for a range of flow rates).

The  manufacturer determines the UV intensity setpoint for their reactor and provides the information to
the test facility and it is described in the TQAP. The first test condition involves reducing UVT until UV
intensity measured by the UV sensor is equal to the UV intensity setpoint. The second test condition
involves testing at high UVT but reducing power until the UV intensity measured by the sensor is equal
to the UV intensity setpoint

UVT shall be adjusted using SuperHume™.  The  testing laboratory/facility may  conduct a scan to
determine the absorbance curve for SH prior to its use.

A single setpoint validation test requires a minimum of three test conditions including a reactor control
test as indicated in Table 3-2.

Table 3-2. Test Conditions for Validation
Test Conditions(a)
Condition 1
Condition 2
Condition 3 (reactor
control)
Flow Rate
Maximum Design
Maximum Design
Maximum Design
UV Transmittance
UVT of sensor
setpoint (b)
Maximum of test
water (> 95%)
Maximum of test
water (> 95%)
Lamp Power
100%
reduced to UVT of
sensor setpoint *• ^
Turned off
   a)  Each test condition except the reactor control will be run in duplicate.
   b)  The manufacturer determines the UV intensity setpoint for their reactor and provides the information to the test
      facility and it is described in the TQAP. The first test condition involves reducing UVT until UV intensity measured
      by the UV sensor is equal to the UV intensity setpoint.

3.4.5  Preparation of the Challenge Microorganisms
The challenge microorganisms, MS2 used to validate UV reactors shall be cultured and analyzed by the
microbiology laboratory as specified in Standard Methods 9224 Standard Methods for the Examination
of Water and Wastewater (APHA et al. current edition).  The specific edition of Standard Methods used
shall be stated in the report.  Protocols for culturing the challenge microorganism and measuring its
concentration shall be defined and based on published and peer-reviewed methods.

Propagation will  result in a highly  concentrated stock solution of essentially  monodispersed phage
whose UV  dose-response follows  second-order kinetics with minimal tailing.  Over  the range  of
reduction  equivalent dose  (RED) values demonstrated during validation testing, the mean UV  dose-
response of the MS2 phage  stock solution should lie within the 95-percent prediction interval of the
mean response in Figure A.I in Appendix A of the UVDGM-2006.  Over a UV dose range of 0 to 120
millijoules per centimeter squared (mJ/cim), the  prediction intervals of the data  shown in Appendix A of
the UVDGM-2006 are represented by the following equations"
                                                14

-------
July 2010


       Upper Bound: log /= -1.4x10-4 *UV Dose2+ 1.6x10-2 ^UV Dose
       Lower Bound : log / = -9.6 x 10-s x UV Dosei. + 4.5 x 10-2 x UV Dose

To assure that the challenge microorganism concentrations are stable over the holding time between
sampling and completion of the assays, tap water shall be filtered using activated carbon to remove any
residual chlorine (confirmed by chemical analysis for total chlorine of the test water), organic
surfactants and dissolved organic chemicals that may be UV absorbers. The test facility may test the
filtered challenge water for the following parameters to assess potential sources or causes of challenge
microorganisms' instability (see Section 4.4.2):
   •   Total chlorine;
   •   Free chlorine;
   •   UV254 ;
   •   UVT;
   •   Total iron;
   •   Total Manganese;
   •   Turbidity;
   •   Total coliform; and
   •   Heterotrophic plate count (HPC).

3.4.6   Conduct Testing - Measuring UV Dose
During full-scale reactor testing, the reactor is operated at each of the test conditions for flow rate, UVT,
and lamp power as described in Section 3.4.4.

The following steps shall be taken to assure meeting data quality objectives:
   •   Steady-state conditions shall be confirmed before injecting the challenge microorganism.
       Confirmation of steady-state involve monitoring UV sensor measurements and the UVT to
       assure the test water and reactor meet the test conditions such as UV sensor intensity reading of
       eighty percent.
   •   The challenge microorganism  shall be injected into the flow upstream of the reactor to achieve at
       least a concentration of 1 X 105 pfu/mL.
   •   Sample taps shall remain open over the duration of the test.
   •   Samples shall be collected in accordance with standards of good practice as defined by Standard
      Methods Section 9060 (APHA et al.1998).
   •   Sampling shall begin after establishing continuous flow, injection of challenge organisms and /
       or Superhume™  and after a minimum of three times the hydraulic retention time of the reactor
       has been achieved.  The inlet and outlet samples shall be collected as close as possible to the
       hydraulic retention time between the inlet and outlet sampling ports. The inlet and outlet
       samples shall be spaced evenly as possible of a minimum of 10 minutes.
   •   Sample volumes  for assessing the challenge microorganism concentrations in the influent and
       effluent shall be no less than 15 milliliter (mL).
   •   Samples shall be collected in bottles that have been cleaned and sterilized.
   •   Collected samples shall be stored on ice, within a cooler, in the dark and then delivered to the
       microbiological lab. Analysis shall be performed within 24 hours of the time the sample was
       collected.
                                              15

-------
July 2010
The following measurement and recording shall be taken to assure meeting data quality objectives:
   •   The flow rate through the reactor, UV sensor measurements, UVT measurements;
   •   Water chemistry grab samples shall be collected once per test condition either before or after the
       challenge organism samples are collected.  Samples for temperature, pH, E. coli, and HPC shall
       be collected at the influent and effluent locations, and samples for iron, manganese, turbidity and
       residual chlorine shall be collected at the influent location.
   •   The UVT as measured by the UV spectrophotometer with each influent sample; and
   •   The electrical power consumed by the UV reactor.

The test shall be repeated if the flow rate, UV intensity, lamp power, or UVT changes by more than the
error of the measurement  over the course of sampling.

The following measurements and recordings shall be taken to assure data quality objectives:  Influent
and effluent water samples shall be collected and analyzed for pH, E.coli, and HPC only at the
beginning and the end of the test. Influent samples only shall be collected and analyzed for iron,
manganese, turbidity and  residual chlorine at the beginning and end of a test.

3.4.7   Test Conditions for UV Intensity Set-line or Multiple Set Points
The testing described for determining the control strategy of a UV intensity set-point, shall be used to
establish multiple set points or a set line (three or  more set points) control  strategy.  A set point is a
combination of a maximum flow rate - minimum irradiance measurement that delivers the required UV
dose.  A set line is three or more set points.

For example, with three set point conditions validated for each microorganism, i.e. maximum flow rate -
minimum irradiance combinations and with corresponding UV doses, the data could  be  presented in a
summary table and then graphed to show a setline. Figure 3-1 shows an example of a  setline graph.  As
shown in the graph, a combination of maximum flow rates and minimum irradiance define an operating
region, which ensures the required UV dose is delivered. The operating region is  above and to the left of
the"            ~
    Figure 3-1. Example Set Line
Minimum Irradiance (mW/cm;
h- ' h- ' K> K
Ut O Ut O U
h^




Operating Region




//


/-"






)0 200 300 400 5C
Flow (gpm)
                                              16

-------
July 2010
                                              4.0 Laboratory Operations Procedures
4.1    Introduction

This protocol specifies procedures that shall be used to ensure the accurate documentation of UV
reactor performance.  Careful adherence to these procedures and to the analytical procedures shall result
in verifiable performance data.

4.2    Analytical Methods

All laboratory analytical methods for water quality parameters are listed in Table 4-1.

Table 4-1. Analytical Methods for Laboratory Analyses
Parameter
Temperature
pH
Total Coliform/
E. coli
Iron
Manganese
Turbidity
MS2

Absorbance
(UV254)
Residual Chlorine
Heterotrophic Plate
Count
Method
SM 2550ฐ
SM 4500-
H^B
SM 9222B
orSM
9223B
EPA 200.7
EPA 200.7
EPA 200.8
SM2130B
Top agar
overlay

SM5910B
SM 4500-C1
D
SM9215B
Reporting
Limit
-
NA
1 CFU/lOOmL
20ug/L
lug/L
0.1NTU(JJ
IPFU/mL

0.000
Absorbance/c
m
0.05 mg/L
1 CFU/mL
Lab
Accuracy
(%
Recovery)
-
ฑ0.1 S.U. of
buffer
NA
70-130
70-130
95-105
NA

60-140
90-110
NA
Lab
Precision
-
ฑ0.1 S.U.
NA
< 30%
< 30%

NA

< 20%
< 10%
NA
Hold
Time
(2)
(2)
30 hours
180 days
180 days
(2)
(4)

48 hours
(2)
24 h
Sample
Container
NA
NA
125 mL sterile
Nalgene
125 mL
polyethylene
125 mL
polyethylene
NA
125 mL sterile
Nalgene

125 mL amber
glass
NA
125 mL Sterile
Nalgene
Sample
Preservation
None
None
None
nitric acid to
pH<2
nitric acid to
pH<2
None
None

None
None
None
 (1) SM = Standard Methods
(2) Immediate analysis required
(3) NTU = Nephelometric Turbidity Unit
(4) Analyze immediately, or store at 4C in the dark for up to 24 hours only if necessary
(5) h = hours

4.2.1   Sample Processing, and Enumeration of MS2:

MS2 bacteriophage sample processing and enumeration will follow Method 9224 Standard Methods for
the Examination of Water and Wastewater (APHA et al. current edition) .
                                              17

-------
July 2010

4.2.2  Percent UVT measurements:
The percent UVT is calculated from A254. The equation for UVT using ^254 is:
       UVT(%)= 100* 10 "A254
Spectrophotometer measurements of A254 shall be verified using NIST-traceable potassium dichromate
UV absorbance standards and holmium oxide UV wavelength standards. The UV spectrophotometer
internal quality assurance and quality control (QA/QC) procedures shall NOT be used to verify
calibration. UV absorbance of solutions used to zero the spectrophotometer shall be verified using
reagent grade organic-free water certified by the supplier to have zero UV absorbance.

The measurement uncertainty of the spectrophotometer must be ten percent or less.  To achieve this
goal, the following procedure shall be used from UVDGM-2006:
   1.  Verify that the spectrophotometer reads the wavelength to within the accuracy of a holmium
       oxide standard (typically ฑ 0.11 nm at a 95-percent confidence level),
   2.  Verify that the spectrophotometer reads A254 within the accuracy of a dichromate standard (e.g.,
       0.281 ฑ 0.004 cm"1 at 257 nm with a 20 mg/L standard), and
   3.  Verify that the water used to zero the instrument has an A254 value that is within 0.002 cm"1 of a
       certified zero absorbance solution.
If the spectrophotometer provides biased readings, the measurements shall be corrected to account for
that bias, or another instrument with measurement uncertainty often percent or less shall be used.

4.3    Analytical QA/QC Procedures
Accuracy and precision of sample analyses shall be ensured through the following measures:
   •   pH - Three-point calibration (4, 7,  10) of the pH meter used to give the reportable data shall be
       conducted daily using traceable buffers.  The accuracy of the calibration shall be checked  daily
       with an independent (separate lot and preferably separate source from the calibration buffers) pH
       buffer. The pH reading for the buffer shall be within + 0.1 SU of the true value. The precision of
       the meter shall be checked daily using duplicate synthetic drinking water samples. The duplicate
       samples shall be within + 0.1 SU.

   •   Temperature - The thermometer used to give the reportable data shall have a scale marked for
       every 0.1ฐC. The thermometer is calibrated yearly using a Hart Scientific Dry Well Calibrator
       Model 9105.
   •   Total chlorine - The calibration of the chlorine meter shall be checked daily using a DI water
       sample (blank), and three QC standards. The measured QC standard values shall be within ten
       percent of their true values.  The precision of the meter shall be checked daily by duplicate
       analysis of synthetic drinking water samples.  The RPD of the duplicate samples shall be less
       than ten percent.
   •   Turbidity - The turbidimeter shall be calibrated as needed according to the manufacturer's
       instructions with formazin standards. Accuracy shall be checked daily with a secondary Gelex
       standard. The calibration check shall give readings within 5% of the true value. The precision
       of the meter shall be checked daily by duplicate analysis of synthetic drinking water samples.
       The RPD of the duplicate samples shall be less than ten percent.
                                               18

-------
July 2010

4.4    Sample Handling
All samples not immediately analyzed shall be labeled with unique identification numbers.  These
identification numbers shall be entered into a Laboratory Information Management System (LIMS), and
shall appear on the lab reports for the tests. All challenge organism samples shall be stored in the dark
at 4 + 2 ฐC and processed for analysis within twenty-four hours or within the holding time established by
stability tests described in Section 4.4.2.

4.4.1   Power Measurements
Voltmeters, ammeters, and power meters used to measure (1) ballast and UV equipment input voltage,
and (2) consumed current and power, must have evidence of being in calibration (e.g., have a tag
showing that it was calibrated).

4.4.2   Full Scale Test Controls
The following quality-control samples and tests for full-scale reactor testing shall be performed:
   •   Reactor controls - influent and effluent water samples shall be collected with the UV lamps in
       the reactor turned off. The change in log concentration from influent to effluent should
       correspond to no more than 0.2 logic.
   •   Reactor blanks - a sample of influent and effluent water shall be collected with no addition of
       challenge microorganism from the flow passing through the reactor at least once on each day of
       testing.  The concentration of challenge microorganisms shall be quantified.  Should the
       challenge microorganism exceed a 0.2 logic concentration, the plumbing associated the testing
       facility, shall be disinfected.  Another reactor blank sample shall be collected and enumerated
       after disinfection and neutralization of the disinfectant.  The reactor blank is considered
       acceptable for challenge testing if the challenge organism does not exceed 0.2 logic
       concentration.
   •   Trip controls - one sample bottle of challenge microorganism stock solution shall travel with the
       stock solution used for validation testing from the microbiological laboratory to the location of
       reactor testing and back to the laboratory. The change in the log concentration of the challenge
       microorganism in the trip control should be within the measurement error of  0.2 logic
       concentration
   •   Method blanks - a sample bottle of sterilized reagent grade water that undergoes the challenge
       microorganism assay procedure shall be analyzed. The concentration of challenge
       microorganism with the method blank shall be non-detectable, according to Standard Methods
      for the Examination of Water and Wastewater (APHA et al. 1998).
   •   Stability samples and testing - Laboratories shall assess the stability of the challenge
       microorganism concentration and its UV dose-response over the time period from sample
       collection to completion of challenge microorganism assay unless the laboratory analyzes
       samples within 12 hours of collection.  Otherwise, all laboratories shall follow the stability
       analyses of this section.  The influent and effluent samples shall be collected at low and high
       UVT. The  challenge microorganism shall be added to achieve a concentration of 1,000 plaque
       forming units (pfu)/L in the samples containing test water at the lowest and highest UVT. A
       sample will be analyzed immediately (called time 0) and then 24 hours, 48 hours and 96 hours
       after time 0. All analyses will be performed in triplicate.  The challenge microorganism
       concentrations in the stability samples shall not vary by more than +/- 0.2 logic of the time 0
                                               19

-------
July 2010

       sample. The testing facility may conduct stability assessment of its test water prior to conducting
       any validation test.

4.4.3  Flow Rate
During validation testing, the variability or precision of flow rate measurements should be less than or
equal to five percent The measurement uncertainty of the flow meter shall be verified by the catch and
weigh method or for larger flow rates that cannot be "caught and weighed" by an alternative method,
such as a calibrated pitometer or second calibrated flow meter, that can provide the required flow meter
calibration and uncertainty data..Calibration of flow rate shall  be completed prior to and within six
months of the start of testing.

4.5    Documentation
All laboratory activities shall be thoroughly documented using lab bench sheets and the LEVIS laboratory
reports.

The laboratory/test facility shall be responsible for maintaining all documentation.  Lab bench sheets
shall be used to record all water treatment equipment operating data in ink as described in Section 6.2
Each page shall be labeled with the project name and number. Errors shall have one line drawn through
them and this line shall be initialed and dated.

Any deviations from the approved final TQAP shall be thoroughly documented at the time of inspection
and in the verification report.
                                              20

-------
 July 2010

	5.0 Quality Assurance Project Plan

5.1    Introduction
A Quality Assurance Project Plan (QAPP) shall be prepared as part of the TQAP for the EPA ETV
verification. Procedures shall be used to ensure data quality and integrity will be specified in the QAPP
and TQAP.  Careful adherence to these procedures shall ensure that data generated from the verification
testing provides sound analytical results that can serve as the basis for the performance verification.

This section outlines steps that shall be taken by the laboratory/testing facility to ensure that data
resulting from verification testing is of known quality and that a sufficient number of critical
measurements are taken.

5.2    Quality Assurance Responsibilities
A number of individuals shall be responsible for test equipment operation, sampling, and analysis
QA/QC throughout the verification testing.  Primary responsibility for ensuring that these activities
comply with the QA/QC requirements of the TQAP rests with the supervisors of the individual
laboratories.

The laboratory/testing facility QA/QC staff shall review the raw data records for compliance with
QA/QC requirements. The laboratory/testing facility staff shall check one hundred percent of the raw
data records against the reported results in the LIMS reports.

5.3    Data Quality Indicators
The data obtained during the verification testing must be of sound quality for conclusions to be drawn
on the treatment equipment. For all verification activities, data quality parameters must be established
based on the proposed end uses of the data.  These parameters include five indicators of data quality:
representativeness, accuracy, precision, statistical uncertainty, and completeness.

5.3.1   Representativeness
Representativeness refers to the degree to which the data accurately and precisely represent the
conditions or characteristics of the parameter represented by the data, or the expected performance of the
reactor under normal use conditions. Representativeness shall be ensured by executing consistent
sample collection protocols, including timing of sample collection, sampling procedures, and sample
preservation. Representativeness shall also be ensured by using each analytical method at its optimum
capability to provide the most accurate and precise measurements possible.

5.3.2.  Accuracy
Accuracy is a measure of the deviation of the analytical value from the true value.  Since true values for
samples can never be known, accuracy measurements are made through analysis of certified standards
or QC samples of a known quantity.

Accuracy shall be maintained through the following items:
   •   Maintaining consistent sample collection procedures, including sample locations, timing of
       sample collection, and sampling procedures;
                                               21

-------
July 2010

   •   Calibrated instruments; and
   •   Laboratory control samples (e.g., method blanks, duplicates, matrix spikes, matrix spike
       duplicates, and performance evaluation samples).

Recoveries for spiked samples shall be calculated in the following manner:

                                       100*(SSR-SR)
                    Percent Recovery =	—	
                                             o^4
where: SSR = spiked sample result
       SR = sample result
       SA = spike amount added

Recoveries for laboratory control samples are calculated as follows:

                                       100 * (Found Concentration)
                    Percent Recovery =
                                            True Concentration
For acceptable analytical accuracy, the recoveries must be within control limits. The laboratory's
minimum acceptable accuracy for each parameter is listed in Table 4-1.
The accuracy of the benchtop chlorine, pH, and turbidity meters shall be checked daily during the
calibration procedures using certified check standards.

5.3.3   Precision
Precision refers to the degree of mutual agreement among individual measurements and provides an
estimate of random error. Precision shall be measured through duplicate sample analysis. One sample
per batch shall be analyzed in duplicate for the total dissolved solids (TDS) and alkalinity analyses. To
check the precision of the benchtop chlorine, pH, and turbidity meters, duplicate synthetic drinking
water samples shall be analyzed daily.

The standard deviation and the relative standard deviation recorded from sample analyses shall be
reported as a means to quantify sample precision.  The percent relative standard deviation should be
calculated in the following manner or equivalent method such as relative percent deviation (RPD) :


              % Relative Standard Deviation = — - - -
       where: S = standard deviation
                    = the arithmetic mean of the recovery values.
                                              22

-------
July 2010

Standard Deviation is calculated as follows:
              Standard Deviation =
                                       n-1

       where: X; = the individual recovery values
              X = the arithmetic mean of then recovery values
              n = the number of determinations.

For acceptable analytical precision under the verification testing program, the percent relative standard

deviation for drinking water samples must be less than 30%.

Precision of the duplicate analyses may be measured by use of the following equation to calculate RPD:
RPD =
:200
where:
       Sl = sample analysis result; and
       ^2 = sample duplicate analysis result.

Acceptable RPD values for each parameter are given in Table 4-1.


5.3.4   Statistical Uncertainty
Statistical uncertainty of the triplicate challenge organism counts shall be evaluated using Microsoftฎ
Excel 2003 to calculate the 95% confidence intervals. The following formula shall be employed for
confidence interval calculation:
                     confidence interval = X ฑ 11.| \Sl4nj
where:        X is the sample mean;
              S is the sample standard deviation;
              n is the number independent measures included in the data set;
              t is the Student's t distribution value with n-1 degrees of freedom; and
              a is the significance level, defined for 95% confidence as:  1 - 0.95 = 0.05.

The uncertainty of the collimated beam data calculations shall be performed according to Section 3.3.
The acceptable uncertainty is thirty percent.
                                               23

-------
July 2010

5.3.5  Completeness
Completeness refers to the amount of data collected from a measurement process compared to the
amount that was expected to be obtained. Completeness refers to the proportion of valid, acceptable
data generated using each method. This portion of the required data for the selected test plan shall be
reported at the conclusion of each testing period.

The completeness objective for data generated during verification testing is based on the number of
samples collected and analyzed for each parameter and/or method.  The following chart illustrates the
completeness objectives for performance parameter and/or method based on the sample frequency:
Number of Samples per
Parameter and/or Method
0-10
11-50
>50
Percent
Completeness
80%
90%
95%
Completeness is defined as follows for all measurements:

                                       %C = (V/T) X 100

       where:
             %C = percent completeness;
             V = number of measurements judged valid; and
             T = total number of measurements.

Retesting may be required if the completeness objectives are not met.

The following are examples of instances that might cause a sample analyses to be incomplete:
   •   Instrument failure;
   •   Calibration requirement not being met;  or
   •   Elevated analyte levels in the method blank.

5.5    Data Validation and Reporting
To maintain good data quality, specific procedures shall be followed during data validation, and
reporting.  These procedures are detailed below.

5.5.1   Data Validation
For the analytical data:

   •   The laboratory/testing facility staff shall review calculations and inspect laboratory logbooks
       and data sheets to verify accuracy of data recording and sampling;
   •   The laboratory/testing facility QA/QC department shall verify that all instrument systems are in
       control and that QA objectives for accuracy, precision, and method detection limits have been
       met; and
                                              24

-------
July 2010

   •   The laboratory/testing facility QA staff shall review the raw data records for compliance with
       QC requirements and check one hundred percent of the data against the reported results from the
       LIMS reports.

Should QC data be outside of control limits, the analytical laboratory supervisor shall investigate the
cause of the problem, and discussion of the problem shall be included in the final report.  Depending on
the severity of the problem, the data in question may be flagged, or not reported.

5.5.2   Data Reporting
The data to be reported shall be the feed and treated water microorganism counts, log reductions, and the
water chemistry data. The QC data, such as calibrations, blanks and reference samples shall not be
reported, but shall be kept on file for inspection upon audit of the facility.


5.6    Testing Inspections
QA staff shall conduct an audit of the laboratory during testing to ensure compliance with the test
procedures and requirements of this Protocol and the developed TQAP. Any variances shall be
reported to the laboratory/testing facility QA staff.
                                               25

-------
 July 2010

	6.0 Data Management, Analysis, and Reporting

6.1    Data Management and Analysis
All operational and analytical data shall be gathered and included in the Final ETV Report.  The data
shall consist of results of analyses and measurements and QA/QC reports.

The data management system for this verification involves the use of the laboratory/testing facility
LEVIS computer system, spreadsheet software and manual recording of system operating parameters.

6.2    Work Plan
The following is the work plan for data management:

    •   Laboratory personnel shall  record equipment operation, water quality and analytical data by hand
       on bench sheets.
    •   All bench sheet entries shall be made in water-insoluble ink.
    •   All corrections on the bench sheets shall be made by placing one line through the erroneous
       information. Any corrections shall be dated and initialed by the lab personnel making the
       correction.
    •   Pertinent information from the bench sheets shall be entered into the LEVIS system.  When the
       test is complete, a preliminary report shall be generated. The preliminary report shall be
       reviewed by the manager of any laboratory that entered data. Once the preliminary report is
       approved, a final laboratory report shall be generated and given to ETV staff.

The database for this verification testing program shall be set up in the form of custom-designed
spreadsheets. Pertinent data from the LEVIS reports shall be entered into the appropriate spreadsheets.
All recorded calculations shall also be checked at this time. Following data entry, the spreadsheet shall
be printed out and the printout checked against the LEVIS report.

6.3    Report of Equipment Testing and Performance
The report shall be issued in draft form for review prior to final publication. The reports shall be
prepared by the laboratory/testing facility and shall  consist of the following:
    •   Introduction;
    •   Description and Identification of Product Tested;
    •   Procedures and Methods Used in Testing;
    •   Results and Discussion, including QA/QC discussion; and
    •   References.

6.3.1   Report Introduction

    •   Study objectives; and
    •   Data quality objectives.
                                              26

-------
 July 2010

6.3.2  Report - Reactor and Equipment Information
The  minimum contents of the report introduction shall include:
General information about the UVReactor:
   •  Specifications for the UV sensor port indicating all dimensions and tolerances that impact the positioning
       of the sensor relative to the lamps; and
   •  Specifications giving the window material, thickness, and UV transmittance as appropriate.
Lamp specifications
   •  Lamp manufacturer and product number;
   •  Electrical power rating;
   •  Electrode-to-electrode length;
   •  Spectral output of new and aged lamps (specified for 5 nm intervals or less over a wavelength range that
       includes the germicidal range of 250 - 280 nm and the response range of the UV sensors);
   •  Mercury content if applicable; and
   •  Envelope diameter.
Lamp sleeve specifications
   •  Technical description including sleeve dimensions;
   •  Material; and
   •  UV transmittance at 254 nm .
Specifications for the reference and the duty UV sensors
   •  Manufacturer and product number; and
   •  Technical description including external dimensions.
Sensor measurement properties
   •  Working range;
   •  Spectral and angular response;
   •  Linearity;
   •  Calibration factor;
   •  Temperature stability; and
   •  Long-term stability.
Installation and operation documentation:
   •  Flow rate, head loss, and pressure rating of the reactor;
   •  Assembly and installation instructions;
   •  Electrical requirements, including required line frequency, voltage, amperage, and power;
   •  Operation and maintenance manuals that include cleaning procedures, required  spare parts, and safety
       requirements; and
   •  Safety requirements.

6.3.3  Report Results, Calculations and Discussion
The  collimated beam dose response data shall be reported using tables and graphs. Table 6-1 is an
example of collimated beam data reports.
                                                 27

-------
July 2010
Table 6-1. Example UV Dose - Response Measurements from Collimated Beam Tests


Target
UV dose
(ml/cm2)
0
20
30
40
60
80
Lowest UVT(1)
Replicate # 1
Nas
pfu/mL






LogN






Replicate # 2
Nas
pfu/mL






LogN






Maximum UVT

Target
UV dose
(ml/cm2)
0
20
30
40
60
80
Replicate # 1
Nas
pfu/mL






LogN






Replicate # 2
Nas
pfu/mL






Log
N






   (1) Low UVT is determined based on lowering the UVT such that the duty sensor on the test unit
   reads the target intensity for the test as specified by the manufacturer.

One UV dose-response curve shall be developed for each UVT condition tested (one high UVT and one
low UVT). The procedure for developing the UV dose response curve is as follows:
   1
  For each UVT test condition and replicate, plot log N (pfu/mL) vs. UV dose (mJ/cm2) to identify a
  common No as the intercept of the curve at UV dose = 0. Table 6-1 shows an example table used to
  collect  the collimated beam data A  separate figure and equation is developed for each  UVT
  condition (lowest and highest). If more than one  day  of testing is performed and  there  are
  additional sets of data for one or more UVT condition,  then separate figures and equations  are
  developed for each dataset.

  The guidance in the UVDGM-2006, Appendix C. Section C.3 item 1 and footnote 2 shall be used
  to determine the NO value at the y intercept. The calculation of NO uses all data points including the
  measured log N at the zero (0) UV dose. The calculated No value shall be used for all subsequent
  calculation (see Step 2) in accordance with UVDGM-2006 recommendation.

2. Calculate log I for each measured value of N (including zero-dose) and the common No identified
  in Step  1 using the following equation:

           log I = log(No/N)

             where:
             No = The common No identified in Step 1  (pfu/mL)
             N = Concentration of challenge microorganisms in the petri dish after
                  exposure to UV light (pfu/mL)

3. Plot UV dose as a function of log I for each UVT test condition.

4. Use regression analysis to derive  an  equation that best fits the data, forcing the fit through  the
  origin. The force fit  through the origin is used rather than the measured value of No, because any
  experimental or analytical  error in the measured value is carried to all the data points,  adding an
                                              28

-------
July 2010

     unrelated bias to each measurement. Using the y-intercept of the curve eliminates the error carry
     through.

The  UVDGM-2006 recommends  combining UV dose response curves whenever possible. For  each
microorganism (e.g. MS2,) there will be a minimum of four data points for each UV dose (low UVT in
duplicate, maximum UVT in duplicate). The data for both  low and high UVT shall  be  evaluated to
determine  if  they  can  be  combined  into  one  data   set.   The  UVDGM-2006  guidance  (
Appendix C Section C.3 and C.50) provides information  on  the statistics and procedures to be used to
evaluate if data sets can be combined. Additional discussion is also presented in  Sections 3.3.6 and 3.3.7
in this protocol.

In general, the data on observed test conditions (flow rate UVT, lamp power and UV sensor intensity
measurements), measured influent  and effluent MS2 concentrations including triplicate results and UV
duty sensor checks shall be presented in tabular form. Tables 6-2, 6-3, and 6-4 show examples of the
tabular data that is collected from the validation tests.
Table 6-2. Flow Rate, UVT, Lamp Power, and UV Sensor Data during Test Runs
Test
Condition
1
1
2
2
3
3
Replicate
Run Number
1
2
1
2
1
2
Flow Rate
(gpm)






UVT
(%)






Lamp Power
(%)






Sensor Reading
(mW/cm2)






Continue Table for as many conditions and the condition replicate runs as needed.
                                              29

-------
July 2010
Table 6-3. Influent and Effluent Challenge Microorganism Concentrations
Test
Condition
- Replicate
1-1
1-2
2-1
2-2
3-1
3-2
Influent Log Concentration
Replicate #
1






2






3






Effluent Log Concentration
Replicate #
1






2






3






Continue Table for as many conditions and the condition replicate runs as needed.
Table 6-4. Reference TJV and Duty Sensor Checks
Before/after
Testing
Before
Before
After
After
UVT
(%)
Low
High
Low
High
Lamp
Power
(%)
100
Low
100
low
Duty
Sensor
(mW/cm2)




Refer. Sensor #1
(mW/cm2)




Refer. Sensor #2
(mW/cm2)




6.3.3.1 RED Calculations
The Reduction Equivalent Dose (RED) results shall be averaged for each test condition and evaluated to
identify the minimum value.

For each test condition replicate (i.e., each influent and effluent sample taken at approx. the same time -
three sets collected over ten minutes), the log inactivation (log I) will be calculated using the following
equation:
             where:
                    log/ = log(N0/N)

                    No = challenge microorganism concentration in influent sample in pfu/mL, N =
                    Challenge  microorganism  concentration  in  corresponding  effluent  sample
                    (pfu/mL).
                      9
Next the RED, in ml/cm , for each test condition replicate (i.e., each influent and effluent sample taken
at approx. the same time - three sets collected over ten minutes) shall be determined using the measured
log inactivation  (log I) and the  collimated beam test UV dose-response curves. If individual  dose-
response curves  developed on the same day of testing cannot be combined, the curve  resulting in the
lowest RED values shall be used.

The individual replicate RED values shall be averaged to produce one RED for each test condition.
From these average values, the minimum RED shall be selected and used in the  validated  dose
calculation. RED values determined for each test  condition and replicate will be summarized in a table
                                              30

-------
July 2010
with the calculated average and the standard deviation. Table 6-5 shows an example table format for
presenting the RED data for MS2.

Table 6-5. Log Inactivation and RED Results
Test
Condition
1
2
O
4
5
6
UVT
(%)
Low
High
Low
High
Low
High
Log I
Replicate #
1






2






3






RED (mJ/cm2)
Replicate #
1






2






3






Avg.






SDRED






6.3.3.2 Deriving the Validation Factor
Several uncertainties and biases are involved in using experimental testing to define a validated dose and
validated operating conditions such as challenge microorganism UV sensitivity, and sensor placement or
variability. The validated dose shall be determined from dividing the RED by a validation factor (VF) to
quantitatively account for key areas of uncertainty and variability. The equation for the VF is shown
below.
       where:
              VF = BRED X [1+ (Uvai / 100)]

              VF = Validation Factor
              BRED = RED bias factor
              Uvai = Uncertainty of validation expressed as a percentage

6.3.3.3 RED Bias and Factor
The RED bias factor is a correction factor that accounts for the difference between the UV sensitivity of
the target pathogen and the UV sensitivity of the test microorganism.  The RED bias factor will be
derived from the procedures described in Section 5.9.1 of the UVDGM-2006.

The uncertainty of validation (Uvai) addresses many sources of experimental uncertainty.  As the critical
source of uncertainty, such as the sensor readings, or the fit of the dose-response curve, is unknown in
advance of the validation testing, the EPA developed a decision tree to assist in establishing Uvai.
Figure 5.4 of the UVDGM-2006 which is specific to a UV intensity set point approach, shall be used to
determine Uvai in calculating the validated dose.

Per Figure 5.4 in EPA's UVDGM-2006, any of the following equation may be used to establish the Uvai:

              UVal = (USP2 + US2)1/2
              UVal = USP
              UVal = (USP2 +UDR2)1/2
              UVal = (USPZ
       Where in:
                           •Usz
UDR2)1/2
                                               31

-------
July 2010

             Us = Uncertainty of sensor value, expressed as a fraction
             UDR = Uncertainty of the fit of the dose-response curve,
             USP = Uncertainty of set-point.

The EPA's UVDGM-2006 defines how the above uncertainties are calculated.

The QC requirement that the duty sensor measurements should be within 10% of the average of two or
more reference sensors eliminates the need to calculate the Us factor per the UVDGM-2006, Section
5.4.4. The UDR factor calculation is shown in Section 3.3.8 of this TQAP. The UVDGM also shows the
formula and calculations for UDR in Appendix C, section C4.

The uncertainty in the setpoint value (Usp) is based on a prediction interval at a 95-percent confidence
level using the following procedure:

       1. Calculate the average and standard deviation of RED values for each test condition (typically
         at least 3-5 replicate pairs are generated for each test condition).

       2. Calculate the uncertainty of the setpoint RED using:

             USP = [(t X SDRED) / (RED)] X 100%

          where:
             RED = Average RED value measured for each test condition
             SDRED = Standard deviation of the RED values measured for each test condition
             t = t-statistic for a 95-percent confidence level defined as a function of the number of
             replicate samples and assuming n-1 degrees of freedom.
             Note: the UVDGM has error in the description of this statistic. The t-statistics should be
             for n-1  degrees of freedom, not for the n-degrees of freedom shown in the UVDGM.


       3. Select the highest USP from all test conditions for calculating the VF.

After establishing the Uvai, the VF is calculated  (see above equation).  The validated dose shall then be
calculated as follows:

             Validated dose = RED/VF.

The final report and summary statement, shall present the validated dose contingent on these operating
conditions:
   •   The UV intensity as measured by the duty sensors must be greater than the UV intensity set-
       point to achieve the validated dose;
   •   The flow  rate must be equal to or less than the test condition flow rate; and
The lamp status must be equivalent to the status of the lamps during the test
                                              32

-------
 July 2010

	Attachment 1:
Reactor Schematic Diagrams and Technical Manual
                                        33

-------
July 2010
                                                         34

-------