£ CDA                                           EPA 542-R-13-003

\/CflT\                                                 May 2013

    United States                      Office of Solid Waste and Emergency Response
    Environmental Protection                      ,.„„   „_   „  , °    ...     ,
    Agency                                  Office of Superfund Remediation and

                                                    Technology Innovation
                      Optimization Review

               Baird & McGuire Superfund Site


   Town of Holbrook, Norfolk County, Massachusetts
 www.epa.gov/superfund/remedytech | www.clu-in.org/optimization | www.epa.gov/superfund/cleanup/postconstruction

-------
                  OPTIMIZATION REVIEW
           BAIRD & McGuiRE SUPERFUND SITE
TOWN OF HOLBROOK, NORFOLK COUNTY, MASSACHUSETTS
                  Report of the Optimization Review
         Site Visit Conducted at the Baird & McGuire Superfund Site on
                     February 28, 2012
                        May 17, 2013

-------
                                EXECUTIVE SUMMARY
Optimization Background

The U.S. Environmental Protection Agency (EPA) defines optimization as the following:

      "Efforts at any phase of the removal or remedial response to identify and implement specific
      actions that improve the effectiveness and cost-efficiency of that phase. Such actions may also
      improve the remedy's protectiveness and long-term implementation which may facilitate
      progress towards site completion. To identify these opportunities, regions may use a
      systematic site review by a team of independent technical experts, apply techniques or
      principles from Green Remediation or Triad,  or apply other approaches to identify
      opportunities for greater efficiency and effectiveness. Contractors, states, tribes, the public,
      andPRPs are also encouraged to put forth opportunities for the Agency to consider. "(1)

An optimization review considers the goals of the remedy, available site data, conceptual site model
(CSM), remedy performance, protectiveness, cost-effectiveness, and closure strategy. A strong interest in
sustainability has also developed in the private sector and within Federal, State, and Municipal
governments. Consistent with this interest, optimization now routinely considers green remediation and
environmental footprint reduction during optimization reviews.

An optimization review includes reviewing site documents, interviewing site stakeholders, potentially
visiting the site for one day, and compiling a report  that includes recommendations in the following
categories:

    •   Protectiveness
    •   Cost-effectiveness
    •   Technical improvement
    •   Site closure
    •   Environmental footprint reduction

The recommendations are intended to help the site team identify opportunities for improvements in these
areas. In many cases, further analysis of a recommendation, beyond that provided in this report, may be
needed prior to implementation of the recommendation. Note that the recommendations are based on an
independent review, and represent the opinions of the optimization review team. These recommendations
do not constitute requirements for future  action, but rather are provided for consideration by the relevant
State and EPA Region and other site stakeholders. Also note that while the recommendations may
provide some details to consider during implementation, the recommendations are not meant to replace
other, more comprehensive, planning documents such as work plans, sampling plans, and quality
assurance project plans (QAPP).
 U.S. Environmental Protection Agency (EPA). 2012. Memorandum: Transmittal of the National Strategy to Expand Superfund
Optimization Practices from Site Assessment to Site Completion. From: James. E. Woolford, Director Office of Superfund
Remediation and Technology Innovation. To: Superfund National Policy Managers (Regions 1-10). Office of Solid Waste and
Emergency Response (OSWER) 9200.3-75. September 28.

-------
Site-Specific Background

The Baird & McGuire Superfund Site is located at 775 South Street in Holbrook, Norfolk County,
Massachusetts, approximately 18 miles south of Boston. The site consists of an approximately 32.5-acre
parcel at the former Baird & McGuire Company, Inc. property. The property is bordered by the Cochato
River to the east and by woodland areas to the north and south. The site-related contamination has
included various volatile and semi-volatile organic compounds (VOCs and SVOCs), pesticides, and
arsenic. The site remedial activities are currently managed and funded by the Massachusetts Department
of Environmental Protection (MassDEP). The site was nominated for an optimization review by
MassDEP as part of a group of optimization evaluations for three long-term remedies in Massachusetts.

EPA issued three Records of Decision (ROD) for the Site, defining four operable units (OU) and
describing selected remedial alternatives, as follows:

    •  The first ROD, issued in September 1986, specified groundwater extraction and treatment at an
       onsite treatment plant (OU-1) and soil excavation with treatment of the soil at an onsite
       incinerator and disposal of the resulting ash on-site (OU-2).

    •  The second ROD, issued in September 1989, addressed contamination in sediments of the
       Cochato River (OU-3).

    •  The final ROD, issued by EPA in 1990, called for reopening the Donna Road well field to replace
       the lost water supply resulting from contamination of the South Street well field (OU-4). An
       Explanation of Significant Difference (ESD) was issued in August 2003 for OU-4 stating that the
       reactivation of the Donna Road well field was not necessary and no further action would be taken
       for OU-4.

The current pump and treat (P&T) system consists of eight extraction wells (EW-2, EW-3, EW-4A, and
EW-5 through EW-9), a groundwater treatment facility and four recharge basins to return treated
groundwater to the aquifer. In 1996, light non-aqueous phase (LNAPL) was discovered in subsurface soil
and groundwater in the central portion of the site. LNAPL recovery began in 1999 and nearly 11,000
gallons of LNAPL were recovered as of April 2004. Subsequently, LNAPL recovery via this system has
diminished to increasingly negligible amounts. Due to a lack of LNAPL recovery, the LNAPL recovery
system was inactivated in March 2009. Although LNAPL has subsequently been detected within the wells
associated with the LNAPL system, the specific gravity of the LNAPL appears to be close to that of water
indicating that all LNAPL may not be present as a distinct LNAPL layer within the well and LNAPL
volumes may be higher than indicated by the LNAPL thickness in a well.

Summary of Conceptual Site Model

Operations from a chemical mixing and batching facility over a 70-year history resulted in contaminant
releases to soil and groundwater from leaking above-ground and below-ground tanks, waste disposal to
the land surface, and other sources. Releases of site-related contamination to the Cochato River included
direct discharges from pipes, contaminated surface water runoff, contact of flood waters with waste
disposal areas and discharge from groundwater to surface water. Contaminants included (but were not
limited to) VOCs, SVOCs, pesticides and arsenic.

Site conditions have improved significantly due to a combination of factors that include the following:
                                              11

-------
    •  discontinuation of site operations by 1983
    •  removal actions performed by EPA
    •  soil excavation
    •  sediment excavation
    •  P&T operation

The remaining contamination at the site that drives current remediation efforts is the LNAPL
contamination and the dissolved arsenic plume. During the site visit, the site team described the
remaining LNAPL as having a specific gravity near 1.0 and as emulsified in groundwater, making
LNAPL measurement and LNAPL recovery by extraction and separation difficult. Residual (immobile
and unrecoverable) LNAPL is also likely still present beneath the water table through much of the area
where LNAPL was identified in the 1997 investigation. The known extent of LNAPL contamination at
the time of the investigation is shown in Figure B-4 in Attachment B, however, it is unclear if LNAPL
was present outside of this area. The current extent of residual LNAPL is not well understood. The
optimization review team speculates that LNAPL (which contains arsenic) continues to provide an
ongoing source of dissolved groundwater contamination for VOCs, SVOCs and arsenic.

While concentrations of naphthalene, other SVOCs and VOCs have declined substantially throughout the
site as the result of remedial activities, the dissolved arsenic plume continues to exhibit high
concentrations throughout the plume. Arsenic concentrations have decreased mildly at some locations
over time, but not nearly as much as the organic contaminants. The dissolved arsenic plume extends from
the principal source area in the vicinity of EW-8 to the Cochato River. The optimization review team
speculates that the remaining organic contamination (for example, VOCs, SVOCs, and potentially other
petroleum hydrocarbons) serves as electron donor for microbes in groundwater and decreases the
oxidation-reduction potential (ORP) in much of the aquifer. The optimization review team further
speculates that the lower ORP contributes to mobilization of arsenic from native soils and or soil remedy
ash, potentially resulting in an additional ongoing source  of arsenic. To the extent these speculations are
correct, as long as sufficient dissolved organic carbon is present in groundwater, widespread continuing
sources of arsenic will persist.

The goal of the groundwater remedy is to return the aquifer to drinking water standards. However, much
of the site is within the 100-year flood plain and or is wetlands, which limits future use of the land or
underlying water resource. The Cochato River is the only media at the site that provides a current
potentially complete exposure pathway to human or ecological receptors.

Summary of Findings

The following findings are either apparent in the optimization review team's interpretation of the CSM or
are explicitly stated in the findings section:

    •  The soil remedy has significantly reduced VOC and SVOC groundwater contamination and only
       a few locations remain above applicable standards.

    •  The optimization review team speculates that residual LNAPL present throughout much of the
       site may continue to serve as a source of arsenic.  The  extent of residual LNAPL has not been
       fully delineated.

    •  The optimization review team speculates that residual LNAPL throughout much of the site may
       continue to serve as a source of dissolved organic carbon, resulting in low ORP.


                                               iii

-------
    •  The optimization review team speculates that low ORP is contributing to mobilization of arsenic
       from native soils and soil remedy ash. Arsenic concentrations in groundwater remain elevated
       significantly above applicable standards.

    •  Significant arsenic impacts between EW-7 and EW-9 have recently been identified but
       contamination in this area of the site has not been definitively linked to a specific source area.
       Unlike other areas of elevated arsenic contamination, there are no data in that area of the site for
       LNAPL, VOCs, SVOCs or ORP.

    •  The arsenic plume may be captured in the area of EW-7, but other portions of the plume are
       likely not captured by the extraction system (such as near EW-9 or between EW-7 and EW-9).

    •  No sampling has been conducted on sediments or fish tissue in the Cochato River since  2002,
       thus current contaminant concentrations in river sediments and fish tissue are unknown. The
       effect contaminated groundwater may potentially have on river sediments and or fish tissue under
       pumping or non-pumping conditions is unknown.

    •  The groundwater extraction system is in poor and deteriorating condition. The extraction rate in
       2001 was approximately 127 gallons per minute (gpm) but has decreased over time to a current
       extraction rate under 60 gpm, in part due to underperforming or deteriorating extraction wells.
       The site team notes that the construction of the monitoring wells includes dissimilar metals and
       the associated corrosion is causing the screen to  separate from the casing. EW-5 was recently shut
       down due to this type of problem. EW-9 never provided the anticipated flow and typically
       operated at an average extraction rate of less  than 1 gpm.

    •  The groundwater treatment system is also in  deteriorating condition and has several
       underperforming components, although the system routinely meets regulatory discharge
       requirements.

    •  The current annual operation & maintenance (O&M) cost is approximately $900,000 per year.

Summary of Recommendations

Recommendations are provided to improve remedy effectiveness, reduce cost, provide technical
improvement and assist with accelerating site closure. The recommendations in these  areas are
summarized below. A flowchart summarizing potential remediation scenarios associated with some of the
recommendations is included in this report (Figure 6-1).

Improving effectiveness - Recommendations include the following:

    •  Resume fish tissue sampling (current conditions and then every five years). Specific  fish types
       and quantities are suggested. Also, the optimization review team recommends that data  quality
       objectives for analyzing fish tissue moving forward be clearly documented.

    •  Sample the Cochato River sediments under current conditions, and then annually, using the
       incremental sampling methodology (ISM) at each of the five stations on a move forward basis.
       This approach is being recommended to provide data that will allow comparison of conditions
       overtime.
                                              IV

-------
    •   Conduct speciation analysis for arsenic in groundwater samples from select monitoring wells to
        better understand arsenic mobility.

    •   Add laboratory analysis for total petroleum hydrocarbons (TPH) and total organic carbon (TOC)
        to the routine groundwater monitoring program to better correlate residual organic contamination
        with low ORP and high arsenic concentrations.

    •   Perform leaching tests on ash to better understand if ash is a continuing source of arsenic.

Reducing cost - Recommendations include the following:

    •   Reduce groundwater treatment plant reporting because developing both daily and weekly reports
        provides limited benefit to managing the site but require additional labor.

    •   If the existing treatment plant is going to operate for five years or less, optimize the metals
        removal system by adjusting the ORP  and pH set points, modifying the type of oxidant used and
        modifying the plumbing to the clarifier. If the treatment plant is going to operate for longer,
        redesigning and replacing the metals removal system and other treatment components would
        likely be more cost effective.

    •   Discontinue aeration in the  activated sludge units and use those units for solids settling only,
        because the aeration is providing little benefit to overall water treatment but is likely contributing
        to biofouling of the granular activated carbon (GAC) units.

    •   Potential long-term cost savings from remediation scenarios "A" through "D" on Figure 6-1 are
        also discussed. The optimization team believes the approach that likely has the greatest potential
        to reduce long-term (such as, life-cycle) costs is to pursue more aggressive source area
        remediation, because the goal of such efforts would be to ultimately eliminate the need for long-
        term containment which currently costs on the order of $900,000 per year for an indefinite period.
        A modified P&T system in the future, for example, might cost on the order of $500,000 per year.
        The payoff period would depend on the ultimate up-front cost of the active remediation, whether
        or not it is successful at eliminating the need for long-term P&T, and the avoided costs per year
        for long-term P&T after it is decommissioned. Note that an ultimate decision regarding a path
        forward (such as, the most appropriate remediation scenario) will depend on evaluation of future
        data collection and testing that is recommended in this optimization review report.

Technical improvement - Record and report ORP results with groundwater monitoring data so that ORP
measurements can be correlated with the arsenic concentrations.

Site closure - Recommendations include the following:

    •   Determine if the primary focus of the response to this site going forward will be additional soil
        and groundwater source remediation or continue to operate and improve the existing containment
        remedy.

           o   If the primary focus is to continue with the containment remedy, the optimization review
               team believes that significant up-front modifications to the current P&T system in the
               short term will be required, due to the expectation of long-term P&T operation for a
               containment-focused remedy.  In addition, definition of a target capture zone, a capture
               zone evaluation and several improvements to the extraction system will be needed.

-------
           o   If the primary focus is additional aggressive source area remediation (to avoid the need
               for long-term migration control), the primary objective would be to address the organic
               contamination, including residual LNAPL that the optimization review team speculates is
               1) serving as a continuous source of arsenic and 2) is causing low ORP that allows
               arsenic to remain mobile and may mobilize arsenic from site soils. Based on current
               information, the optimization review team believes in situ chemical oxidation (ISCO)
               may be an appropriate technology for the source area due to the relatively low upfront
               costs (as compared to other technologies) and the ability to adjust the level of effort and
               costs based on remedy performance.

    •   If additional aggressive source area remediation is to be pursued, pilot testing and LNAPL
       characterization is suggested to evaluate the feasibility and cost of full-scale source area
       remediation. Also, considerations are provided regarding migration control during the period of
       aggressive source area remediation (for example, no P&T, limited P&T extraction, expanded
       P&T extraction).

Green Remediation - No green remediation recommendations are provided. Recommendations are
focused on remedial effectiveness and remedial strategy. Green remediation practices can be considered
once the site team has decided on the optimal remedial approach.
                                               VI

-------
                                         NOTICE
Work described herein was performed by Tetra Tech for the U.S. Environmental Protection Agency
(EPA). Work conducted by Tetra Tech, including preparation of this report, was performed under Work
Assignment 2-58 of EPA contract EP-W-07-078 with Tetra Tech EM, Inc., Chicago, Illinois. Mention of
trade names or commercial products does not constitute endorsement or recommendation for use.
                                             vn

-------
                                         PREFACE
This report was prepared as part of a national strategy to expand Superfund optimization from remedial
investigation to site completion implemented by the United States Environmental Protection Agency
(EPA) Office of Superfund Remediation and Technology Innovation (OSRTI)(2). The project contacts are
as follows:
          Organization
    Key Contact
         Contact Information
EPA Office of Superfund
Remediation and Technology
Innovation
(OSRTI)
Kirby Biggs
EPA
Technology Innovation and Field Services
Division
1200 Pennsylvania Ave., NW (5203P)
Washington, DC 20460
biggs.kirby@epa.gov
phone: 703-823-3081	
Tetra Tech, Inc.
(Contractor to EPA)
Jody Edwards, P.O.
                                   Doug Sutton, PhD,
                                   P.E.
Tetra Tech
1881 Campus Commons Drive, Suite 200
Reston,VA20191
iody.edwards@tetratech.com
phone: 802-288-9485
Tetra Tech
2 Paragon Way
Freehold, NJ 07728
phone: 732-409-0344
doug.sutton@tetratech.com
 U.S. Environmental Protection Agency (EPA). 2012. Memorandum: Transmittal of the National Strategy to Expand Superfund
Optimization Practices from Site Assessment to Site Completion. From: James. E. Woolford, Director Office of Superfund
Remediation and Technology Innovation. To: Superfund National Policy Managers (Regions 1 - 10). Office of Solid Waste and
Emergency Response (OSWER) 9200.3-75. September 28.
                                              viii

-------
                               LIST OF ACRONYMS
micrograms per liter
micrograms per cubic meter
above mean sea level
applicable or relevant and appropriate requirements
air sparging / soil vapor extraction
below ground surface
best management practice
Comprehensive Environmental Response, Compensation, and Liability Act
cubic feet per minute
Clean Harbors Environmental Services
chemical of concern
compound specific isotope analysis
conceptual site  model
dichlorodiphenyltrichloroethane
Department of Environmental Quality Engineering
decision unit
Environmental  Data Resources Inc.
United States Environmental Protection Agency
Environmental  Response Team
Explanation of Significant Difference
Federal Insecticide, Fungicide and Rodenticide Act of 1947
feasibility study
feet
feet squared
cubic feet
Five Year Review
granular activated carbon
gallons per minute
groundwater treatment facility
human health risk assessment
hazard index
horsepower
institutional controls
in situ chemical oxidation
incremental sampling methodology
in situ thermal treatment
Interstate Technology Regulatory Council
hydraulic conductivity
light non-aqueous phase liquid
(ig/m3
Amsl
ARARs
AS/SVE
bgs
BMP
CERCLA
cfm
CHES
COC
CSIA
CSM
DDT
DEQE
DU
EDR
EPA
ERT
BSD
FIFRA
FS
ft
ft2
ft3
FYR
GAC
gpm
GWTF
HHRA
HI
HP
1C
ISCO
ISM
ISTT
ITRC
K
LNAPL
                                            IX

-------
LTM
LTRA
MassDEP
MCL
MCP
MOD
mg/kg
MSL
MTCA
MTL
MW
NPL
O&M
ORP
OSRTI
OU
P&T
PAH
PCE
PLC
PRP
PVC
QA
QAPP
RA
RAO
RG
RI
ROD
RSE
SDWA
SIM
SPLP
su
SVE
SVOC
TAB
TCE
TCLP
TIFSD
UST
VI
VOC
long term monitoring
Long-Term Response Action
Massachusetts Department of Environmental Protection
maximum contaminant limit
Massachusetts Contingency Plan
millions of gallons per day
milligrams per kilogram
mean sea level
Model Toxics Control Act
materials testing laboratory
monitoring well
National Priorities List
Operation & Maintenance
oxidation reduction potential
Office of Superfund Remediation and Technology Innovation
operable unit
pump and treat
polycyclic aromatic hydrocarbon
tetrachloroethylene (perchloroethylene)
programmable logic controller
potentially responsible party
polyvinyl chloride
quality assurance
Quality Assurance Project Plan
Remedial Action
remedial action objective
remediation goal
remedial investigation
Record of Decision
remedial system evaluation
Safe Drinking Water Act
selected  ion monitoring
synthetic precipitation leaching procedure
sampling unit
soil vapor extraction
semi-volatile organic compound
Technical Assistance to Brownfields
trichloroethylene
toxicity characteristic leaching procedure
Technology Innovation and Field Services Division
underground storage tank
vapor intrusion
volatile organic compound

-------
                         TABLE OF CONTENTS
EXECUTIVE SUMMARY	i
NOTICE	vii
PREFACE	viii
LIST OF ACRONYMS	ix
TABLE OF CONTENTS	xi
1.0  INTRODUCTION	1
    1.1 PURPOSE	1
    1.2 TEAM COMPOSITION	2
    1.3 DOCUMENTS REVIEWED	3
    1.4 QUALITY ASSURANCE	5
    1.5 PERSONS CONTACTED	5
2.0  SITE BACKGROUND	7
    2.1 LOCATION	7
    2.2 SITE HISTORY	7
       2.2.1    HISTORIC LAND USE AND OPERATIONS	7
       2.2.2    CHRONOLOGY OF ENFORCEMENT AND REMEDIAL ACTIVITIES	7
    2.3 POTENTIAL HUMAN AND ECOLOGICAL RECEPTORS	9
    2.4 EXISTING DATA AND INFORMATION	10
       2.4.1    SOURCES OF CONTAMINATION	10
       2.4.2    GEOLOGY SETTING AND HYDROGEOLOGY	10
       2.4.3    GROUNDWATER CONTAMINATION	11
       2.4.4    COCHATO RIVER SEDIMENT/SOIL AND SURFACE WATER CONTAMINATION	11
3.0  DESCRIPTION OF PLANNED OR EXISTING REMEDIES	13
    3.1 REMEDY AND REMEDY COMPONENTS	13
       3.1.1    SOIL REMEDIATION	13
       3.1.2    SEDIMENT EXCAVATION	14
       3.1.3    EXTRACTION SYSTEM	14
       3.1.4    GROUNDWATER TREATMENT SYSTEM	15
       3.1.5    LNAPLRECOVERY SYSTEM	16
    3.2 REMEDIAL ACTION OBJECTIVES AND STANDARDS	16
       3.2.1    GROUNDWATER	16
       3.2.2    SEDIMENTS	17
    3.3 PERFORMANCE MONITORING PROGRAMS	18
       3.3.1    GROUNDWATER	18
       3.3.2    SEDIMENT AND FISH TISSUE SAMPLING	19
4.0  CONCEPTUAL SITEMODEL	20
    4.1 CSM OVERVIEW	20

                                    xi

-------
   4.2 CSM DETAILS AND EXPLANATION	22
       4.2.1    GROUNDWATER	22
       4.2.2    COCHATO RIVER SEDIMENTS	25
   4.3 DATA GAPS	25
   4.4 IMPLICATIONS FOR REMEDIAL STRATEGY	26
5.0  FINDINGS	27
   5.1 SOURCES	27
       5.1.1    THE SOIL REMEDY HAS SIGNIFICANTLY REDUCED VOC AND SVOC
              GROUNDWATER CONTAMINATION	27
       5.1.2    RESIDUAL LNAPL THROUGHOUT MUCH OF THE SITE MAY CONTINUE TO
              SERVE AS A SOURCE OF LNAPL AND DISSOLVED ORGANIC CARBON	27
       5.1.3    Low ORP (POTENTIALLY CAUSED BY RESIDUAL DISSOLVED ORGANIC
              CARBON) MAY BE MOBILIZING ARSENIC FROM SITE SOILS AND SOIL REMEDY
              ASH AND is ALLOWING ARSENIC IN GROUNDWATER TO REMAIN MOBILE	27
   5.2 GROUNDWATER	27
       5.2.1    LNAPL DELINEATION	27
       5.2.2    PLUME DELINEATION	27
       5.2.3    PLUME CAPTURE	28
       5.2.4    GROUNDWATER CONTAMINANT CONCENTRATIONS	28
   5.3 SEDIMENT	28
   5.4 TREATMENT SYSTEM COMPONENT PERFORMANCE	29
       5.4.1    EXTRACTION SYSTEM	29
       5.4.2    TREATMENT SYSTEM	29
   5.5 REGULATORY COMPLIANCE	30
   5.6 COMPONENTS OR PROCESSES THAT ACCOUNT FOR MAJORITY OF ANNUAL COSTS	30
   5.7 APPROXIMATE ENVIRONMENTAL FOOTPRINTS ASSOCIATED WITH REMEDY	31
   5.8 SAFETY RECORD	33
6.0  RECOMMENDATIONS	34
   6.1 RECOMMENDATIONS TO IMPROVE EFFECTIVENESS	36
       6.1.1    RESUME FISH SAMPLING	36
       6.1.2    SAMPLE THE COCHATO RIVER SEDIMENTS USING THE INCREMENTAL
              SAMPLING METHODOLOGY	36
       6.1.3    CONDUCT SPECIATION ANALYSIS FOR ARSENIC IN SELECT MONITORING
              WELLS	37
       6.1.4    ADD TOTAL PETROLEUM HYDROCARBONS AND TOTAL ORGANIC CARBON TO
              LABORATORY ANALYSES FOR ROUTINE GROUNDWATER MONITORING	38
       6.1.5    PERFORM LEACHING TESTS ON SITE SOILS TO BETTER UNDERSTAND IF SITE
              SOILS ARE A CONTINUING SOURCE OF ARSENIC	38
   6.2 RECOMMENDATIONS TO REDUCE COSTS	38
       6.2.1    REDUCE TREATMENT PLANT REPORTING	38
       6.2.2    OPTIMIZE METALS REMOVAL SYSTEM	39
       6.2.3    DISCONTINUE AERATION IN ACTIVATED SLUDGE UNITS	40
       6.2.4    POTENTIAL LONG-TERM COST SAVINGS FROM REMEDIATION SCENARIOS	40
   6.3 RECOMMENDATIONS FOR TECHNICAL IMPROVEMENT	41
                                    Xll

-------
        6.3.1    RECORD AND REPORT ORP RESULTS WITH GROUNDWATER MONITORING
                DATA	41
    6.4 CONSIDERATIONS FOR GAINING SITE CLOSE OUT	41
        6.4.1    DETERMINE IF PRIMARY Focus WILL BE SOURCE REMEDIATION OR
                CONTAINMENT	41
        6.4.2    PILOT TESTING AND LNAPL CHARACTERIZATION IN CONJUNCTION WITH
                MORE AGGRESSIVE SOURCE REMEDIATION	46
        6.4.3    CONSIDERATIONS FOR IMPROVING MIGRATION CONTROL IN CONJUNCTION
                WITH MORE AGGRESSIVE SOURCE REMEDIATION	46
    6.5 RECOMMENDATIONS RELATED TO GREEN REMEDIATION	47
    6.6 SUGGESTED APPROACH TO IMPLEMENTING RECOMMENDATIONS	48

List of Tables

Table 1-1     Optimization Team Members
Table 1-2     Site Visit Attendees
Table 3-1     Extraction Well Rates and Influent Concentrations from December 2011
Table 3-2     GW-1 Standards for Key Site Contaminants
Table 3-3     ROD-Specified Human Health Target Levels for Sediment Contaminants of Concern
             Action Limits for Sediments Reported in Site Documents
Table 3-4     Action Limits for Sediments Reported in the 2009 FYR
Table 5-1     Summary of Current Annual O&M Costs
Table 5-2     Estimated Environmental Footprint
Table 6-1     Cost Summary Table
Table 6-2     Cost Summary Matrix for Site Closeout Considerations
List of Figures

Figure 6-1     Flowchart Summarizing Potential Remediation Scenarios

Attachments

Attachment A: Figures from Existing Site Reports

Attachment B: Figures Prepared by Optimization Team

       Figure B-l     Summary of July 2011 Sampling Results for SVOCs
       Figure B-2     Summary of 2011 Sampling Results for Arsenic
       Figure B-3     Summary of July 2011 Sampling Results for Pesticides
       Figure B-4     Approximate Historical Extent of LNAPL (with July 2011 Arsenic Sampling
                    Results)
       Figure B-5     Figure B-5. pH/eH diagram for MW97-21
       Figure B-6     Figure B-5. pH/eH diagram for MW97-17
       Figure B-7     Figure B-5. pH/eH diagram for MW97-12
       Figure B-8     Figure B-5. pH/eH diagram for MW97-20
       Figure B-9     ORP vs. Arsenic for July 2011 Sampling Event


Attachment C: Historic VOC and SVOC Trends at Selected Wells

                                         xiii

-------
                                1.0   INTRODUCTION
1.1     PURPOSE

During fiscal years 2000 and 2001 independent site optimization reviews called Remediation System
Evaluations (RSEs) were conducted at 20 operating Fund-lead pump and treat (P&T) sites (i.e., those sites
with P&T systems funded and managed by Superfund and various States). Due to the opportunities for
system optimization that arose from those RSEs, U.S. Environmental Protection Agency (EPA) Office of
Superfund Remediation and Technology Innovation (OSRTI) has incorporated RSEs into a larger post-
construction complete strategy for Fund-lead remedies as documented in OSWER Directive No. 9283.1-
25, Action Plan for Ground Water Remedy Optimization. Concurrently, EPA developed and applied the
Triad Approach to optimize site characterization and development of a conceptual site model (CSM).
EPA has since expanded the definition of optimization to encompass investigation stage optimization
using Triad Approach best management practices (BMP), optimization during design, RSEs and long-
term monitoring optimization (LTMO). EPA defines optimization as the following:

      "Efforts at any phase of the removal or remedial response to identify and implement specific
     actions that improve the effectiveness and cost-efficiency of that phase. Such actions may also
     improve the remedy's protectiveness and long-term implementation which may facilitate
     progress towards site completion. To identify these opportunities, regions may use a
     systematic site review by a team of independent technical experts, apply techniques or
     principles from Green Remediation or Triad, or apply other approaches to identify
     opportunities for greater efficiency and effectiveness. Contractors, states, tribes, the public,
     andPRPs are also encouraged to put forth opportunities for the Agency to consider. "(5)

As stated in the definition, optimization refers to a "systematic site review," indicating that the site as a
whole is often considered in the review. Optimization can also be applied to a specific aspect of the
remedy (for example, focus on LTMO or focus on one particular operable unit  [OU]), but  other site or
remedy components are typically considered to the degree that they  affect the focus of the  optimization.
An optimization review typically considers the goals of the remedy, available site data, CSM, remedy
performance, protectiveness, cost-effectiveness and closure strategy.

A strong interest in sustainability has also developed in the private sector and within Federal, State, and
Municipal governments. Consistent with this interest, OSRTI has developed a. Methodology for
Understanding and Reducing a Project's Environmental  Footprint and supporting Spreadsheets for
Environmental Footprint Analysis  (SEFA) to assist the conduct of environmental footprint analyses for
site cleanup (www. cluin.org/greenremediation), and now routinely considers green remediation and
environmental footprint reduction during optimization reviews.

The optimization review includes reviewing site documents, potentially visiting the site  for one day, and
compiling a report that includes recommendations in the  following categories:

    •   Protectiveness
 U.S. Environmental Protection Agency (EPA). 2012. Memorandum: Transmittal of the National Strategy to Expand Superfund
Optimization Practices from Site Assessment to Site Completion. From: James. E. Woolford, Director Office of Superfund
Remediation and Technology Innovation. To: Superfund National Policy Managers (Regions 1 - 10). Office of Solid Waste and
Emergency Response (OSWER) 9200.3-75. September 28.

                                                1

-------
    •  Cost-effectiveness
    •  Technical improvement
    •  Site closure
    •  Environmental footprint reduction

The recommendations are intended to help the site team identify opportunities for improvements in these
areas. In many cases, further analysis of a recommendation, beyond that provided in this report, may be
needed prior to implementation of the recommendation. Note that the recommendations are based on an
independent evaluation, and represent the opinions of the optimization review team. These
recommendations do not constitute requirements for future action, but rather are provided for
consideration by the State of Massachusetts, the Region, and other site stakeholders. Also note that while
the recommendations may provide some  details to consider during implementation, the recommendations
are not meant to replace other, more comprehensive, planning documents such as work plans, sampling
plans, and quality assurance project plans (QAPP).

The national optimization strategy includes a system for tracking consideration and implementation of the
optimization review recommendations and includes a provision for follow-up technical assistance from
the optimization review team as mutually agreed upon by the site management team and EPA OSRTI.

The Baird & McGuire Superfund Site is located at 775 South Street in Holbrook, Norfolk County,
Massachusetts, which is approximately 18 miles south of Boston. Figure 1 of the 4th Quarter 2011
Quarterly Extraction Well Report (see Attachment A) indicates the general site location. The site consists
of an approximately 32.5-acre parcel at the former Baird & McGuire Company, Inc. property. The
property is bordered by the Cochato River to the east and by woodland areas to the north and south. The
site-related contamination has included various volatile and semi-volatile organic compounds (VOCs and
SVOCs), pesticides, and arsenic. The site remedial activities are currently managed and funded by the
Massachusetts Department of Environmental Protection (MassDEP). The site was nominated for an
optimization review by MassDEP as part of a group of optimization evaluations for three long-term
remedies in Massachusetts.
1.2     TEAM COMPOSITION

The optimization review team consisted of the following individuals:

Table 1-1. Optimization Review Team Members
Name
Rob Greenwald
Peter Rich
John Schaffer
Doug Sutton
Affiliation
Tetra Tech GEO
Tetra Tech GEO
Tetra Tech GEO
Tetra Tech GEO
Phone
732-409-0344
410-990-4607
973-630-8530
732-409-0344
Email
Rob . Greenwald@tetratech.com
Peter.Rich@tetratech.com
John.Schaffer@tetratech.com
Doug. Sutton@tetratech.com
The following individuals from the EPA OSRTI also participated in the optimization site visit:
    •   Kathy Yager
    •   Ed Gilbert
    •   Gary Newhart

-------
1.3     DOCUMENTS REVIEWED

The following site documents were reviewed. The reader is directed to these documents for additional site
information not provided in this report.

   •   Remedial Investigation Report, Baird & McGuire Site, Holbrook, MA; Volume I (GHR
       Engineering Associates, Inc. - May 22, 1985)

   •   Remedial Investigation Report, Baird & McGuire Site, Holbrook, MA; Volume II (GHR
       Engineering Associates, Inc. - May 22, 1985)

   •   Remedial Investigation Report, Baird & McGuire Site, Holbrook, MA; Volume III (GHR
       Engineering Associates, Inc. - May 22, 1985)
   •   Draft Addendum Report, Remedial Investigation Phase II Baird & McGuire Site (GHR
       Engineering Associates, Inc. - April 4, 1986)

   •   Draft Feasibility Study Report, Baird & McGuire Site (GHR Engineering Associates, Inc. - April
       4, 1986)

   •   Record of Decision, Remedial Alternative Selection (EPA Region 1 - September 29,  1986)

   •   Record of Decision Summary, Baird & McGuire Site/Sediment Study Area (EPA Regions 1 -
       September 14, 1989)

   •   Site Maintenance Plan for the Baird & McGuire Groundwater Treatment Plant
       Extraction/Recharge System (Metcalf & Eddy, Inc. - February 25, 1989)

   •   Final Focused Feasibility Study, Baird & McGuire Site, Cochato River Sediment (EPA - June
       1989)

   •   Evaluation of Extraction System Performance at the Baird & McGuire Superfund Site (Metcalf &
       Eddy, Inc. - July 1995)

   •   Baird & McGuire Superfund Site Operating Unit #3 Monitoring Results (Environmental
       Engineering and Hydraulics Branch Water Control Division Engineering Directorate, Department
       of the Army - September 1996)

   •   Light Non-Aqueous Phase Liquid Field Investigation Summary Report (McCulley, Frick &
       Oilman, Inc. - January 30, 1998)

   •   Evaluation of Potential Future Reuse Opportunities for the Baird & McGuire Site (Metcalf &
       Eddy, Inc. - June 5, 1998)
   •   Potential for Advection of Volatile  Organic Compounds in Ground Water to the Cochato River,
       Baird & McGuire Superfund Site, Holbrook, Massachusetts, March and April 1998 (Jennifer G.
       Savoie, Forest P. Lyford, USGS and Scott Clifford, EPA -  1999)

   •   Results of Third Year of Long-Term Monitoring of Sediments and Soils at Baird & McGuire
       (Department of the Army, New England District, Corps of Engineers - January 1999)

   •   Fish Ingestion Risk Assessment, Baird and McGuire (Office of Research and Standards, DEP -
       January 7, 1999)

   •   Draft Interim Interpretive Report for Cochato River Sampling and Analysis, Holbrook, MA
       (Battelle-May 31,2000)

-------
Data Evaluation Report for Cochato River Sampling in November 2001 (Metcalf & Eddy - July
2002)
Data Evaluation Report for Cochato River Sampling in November 2001, Appendices (Metcalf &
Eddy - July 2002)
Site Maintenance Plan (August 28, 2003)
Evaluation ofGroundwater Remediation Progress at the Baird andMcGuire Superfund Site
(Metcalf & Eddy, Inc. - September 2003)
Data Evaluation Report for Cochato River Sampling in September/October 2002 (Metcalf &
Eddy, Inc. - November 2003)
Data Evaluation Report for Cochato River Sampling in September/October 2002; Appendices
(Metcalf & Eddy, Inc. - November 2003)
Trend Evaluation Report for the Baird and McGuire Superfund Site, Holbrook, Massachusetts
(Metcalf & Eddy, Inc. - September 2004)
Evaluation ofGroundwater Remediation Progress at the Baird & McGuire Superfund Site
(Metcalf & Eddy, Inc. - October 2004)
Explanation of Significant Difference, Baird & McGuire Superfund Site, Holbrook, MA,
Operable Units 1 and 2, Groundwater and Source Control Remedies (EPA - April 6, 2005)
Baseline Report for Operable Unit-1 at the Baird & McGuire Superfund Site, Final Draft (SAIC
Engineering, Inc. - December 2005)
November 02, 2007 LNAPL Analysis (GeoLabs, Inc.)
Third Five-Year Review Report (EPA Region 1 -  September 29, 2009)
Quarterly Extraction Well Report,  1st Quarter 2011 (Clean Harbors Environmental Services, Inc.
-Draft April, 2011)
Quarterly Extraction Well Report,  4th Quarter 2010 (Clean Harbors Environmental Services, Inc.
-May 9, 2011)
Arsenic Summary Investigation Report - Part II/IIA, Baird & McGuire Superfund Site (Clean
Harbors Environmental Services, Inc. - Draft August 2011)
Limited Subsurface Investigation, Baird and McGuire, Holbrook, MA (Pine & Swallow
Environmental - August 3, 2011)
Monitoring Well Analytical Results July 2010 (Clean Harbors Environmental Services - August
23,2011)
Quarterly Extraction Well Report,  2nd Quarter 2011 (Clean Harbors Environmental Services, Inc.
- Draft September, 2011)
Quarterly Extraction Well Report,  3rd Quarter 2011 (Clean Harbors Environmental Services, Inc.
-DraftOctober 12, 2011)
November 11, 2011 LNAPL Analysis (GeoLabs, Inc.)
December 5, 2011 LNAPL Analysis (Columbia Analytical Services, Inc.)
Monitoring Well Analytical Results July 2011 (Clean Harbors Environmental Services - January
15,2012)

-------
       Evaluation ofGroundwater Remediation Progress, Annual Report - Operable Unit-1, October 1,
       2009 through September 30, 2010 (Clean Harbors Environmental Services, Inc. - February 28,
       2012)

       Quarterly Extraction Well Report, 4th Quarter 2011 (Clean Harbors Environmental Services, Inc.
       -March 21,2012)
1.4     QUALITY ASSURANCE

This optimization review utilized existing environmental data to interpret the CSM, evaluate remedy
performance and make recommendations to improve the remedy. The quality of the existing data is
evaluated by the optimization review team prior to using the data for these purposes. The evaluation for
data quality included a brief review of how the data were collected and managed (where practical, the site
QAPP was considered), the consistency of the data with other site data, and the use of the data in the
optimization review. Data that were of suspect quality were either not used as part of the optimization
review or were used with the quality concerns noted. Where appropriate, this report provides
recommendations made to improve data quality.
1.5     PERSONS CONTACTED
A site visit was conducted on February 28, 2012. In addition to the optimization review team, the
following persons were present for the site visit:

Table 1-2. Site Visit Attendees
Name
Dorothy Allen
Kimberly White
Jay Naparstek
Steve Mahoney
Paul Craffey
Maggie
DeLegorete
Lisa Irwin
John Irwin
Derrick Golden
Margaret
McDonough
Kathy Yager
Ed Gilbert
Gary Newhart
Affiliation
MassDEP (DEP RPM)
EPA Region 1 ( EPA RPM)
MassDEP
MassDEP
MassDEP
Clean Harbors Environmental
Services (CHES)
CHES
CHES
EPA Region 1 (Regional
Optimization Liaison)
EPA Region 1
EPA TIFSD
EPA TAB
EPA ERT
Email Address
dorothy .t.allen@state .ma.us
white. kimberlv(S>epa.gov

Email contact information is provided for the site managers only. Communication with other participants
can be coordinated through the site managers.

-------
CHES operates the current treatment plant under contract to MassDEP. CHES also performs
long-term groundwater monitoring under contract to MassDEP. Ed Gilbert and Gary Newhart
from EPA were present as observers.

-------
                            2.0    SITE BACKGROUND
2.1     LOCATION

The Baird & McGuire Superfund Site is located at 775 South Street in Holbrook, Norfolk County,
Massachusetts, approximately 18 miles south of Boston. Figure 1 of the 4th Quarter 2011 Quarterly
Extraction Well Report (see Attachment A) indicates the general site location. Figure 2 of the same report
(see Attachment A) provides a site plan with well locations. The site consists of an approximately 32.5-
acre parcel at the former Baird & McGuire Company, Inc. property. The property is bordered by the
Cochato River to the east and by woodland areas to the north and south. The west side of the site is
adjacent to South Street, which contains both residential and commercial properties. For the purpose of
increased security and access control measures during remedial actions, additional fencing was
constructed in some areas beyond the site boundary (for example, around the groundwater treatment
plant, recharge basins and beyond the southern site boundary).

Ground elevations range from approximately 170 feet (ft) above mean sea level (MSL) on the southwest
corner of the site to approximately 130 ft above MSL to the northeast and in the central portions of the
site. From the west central portion of the site, the topography slopes down to approximately 119 ft above
MSL on the east side of the site at the Cochato River. Wetlands are present in portions of the site. An
unnamed brook, flowing from west to east across the northern portion of the site, drains into the wetland
area in the central portion of the site. The wetlands and unnamed brook discharge into the Cochato River.
Based on a wetland boundary delineation conducted during the remedial investigation (RI), wetlands
occupied approximately 44 percent of the site, and 66 percent of the site was determined to be within the
100-year floodplain.
2.2     SITE HISTORY

2.2.1       HISTORIC LAND USE AND OPERATIONS

Baird & McGuire Inc. operated a chemical mixing and batching facility from 1912 to 1983. Manufactured
products included herbicides, pesticides, disinfectants, soaps, floor waxes and solvents. Waste disposal
methods at the site included direct discharge into the soil, a nearby brook and wetlands and a former
gravel pit in the eastern portion of the site. Underground disposal systems were also used.

2.2.2       CHRONOLOGY OF ENFORCEMENT AND REMEDIAL ACTIVITIES

The third Five-Year Review  states:

    "The state became involved between 1954 and 1977 and fined the company at least thirty-five
    times for violations of the Federal Insecticide, Fungicide and Rodenticide Act of 1947
    (FIFRA). In 1981 and 1982 the Massachusetts Department of Environmental Quality
   Engineering (DEQE) documented a number of questionable disposal practices. Baird &
   McGuire Inc. performed voluntary remedial actions from February to April of 1982. In May
    1982, the Board of Selectmen of Holbrook revoked Baird & McGuire's permit to store
    chemicals at the site and ordered that existing storage facilities be dismantled. As a result,

                                              1

-------
    operations were terminated.  Operations at the site resulted in contamination of
    groundwater, surface water, soil, and river sediments by organic and inorganic compounds,
    pesticides, and herbicides."

A hydrological study was completed by EPA which initiated some removal actions in 1983. These actions
included the removal of 1,020 cubic yards of contaminated soil, 1 ton of waste creosote, 25 gallons of
waste coal tar, 155 pounds of solid hazardous waste and 47 drums of flammable liquids and solids and 2
drums of corrosives. EPA also oversaw construction of a clay cap, installation of a groundwater
interception-recirculation system, and erection of fencing. The site was added to the National Priority List
(NPL) on September 8, 1983. EPA constructed a security fence in July 1985 to enclose the site.

A Remedial Investigation/Feasibility  Study (RI/FS) (I985/1986a, GHR) identified and described the
presence of a groundwater contamination plume originating from the Baird & McGuire property and
extending beyond the Cochato River. EPA issued three Records of Decision (ROD) for the site, defining
four operable  units (OU) and describing selected remedial alternatives, as follows:

    •   The first ROD, issued in September 1986, specified groundwater extraction and treatment at an
       onsite treatment plant (OU-1) and soil excavation with treatment of the soil at an on-site
       incinerator, and disposal of the resulting ash on-site (OU-2).

    •   The second ROD, issued in September 1989, addressed contamination in the sediments of the
       Cochato River (OU-3).

    •   The final ROD, issued by EPA in 1990, called for reopening the Donna Road well field to replace
       the lost supply resulting from contamination of the South  Street well field (OU-4).

The following are brief summaries describing the remedies for each OU:

       OU-1: Groundwater. The site remediation program for impacted groundwater at OU-1 has been
       in continuous operation since January  1994 and is ongoing. The current system consists of eight
       extraction wells (EW-2, EW-3, EW-4A and EW-5 through EW-9), a groundwater treatment
       facility and four recharge basins to return treated groundwater to the aquifer. In 1996, light non-
       aqueous phase liquid (LNAPL) was discovered in subsurface soil and groundwater in the central
       portion of the site. LNAPL recovery began in 1999 and nearly 11,000 gallons of LNAPL were
       recovered as of April 2004. Subsequently, LNAPL recovery via this system has diminished to
       increasingly negligible amounts. Due to a lack of LNAPL recovery, the LNAPL recovery system
       was inactivated in March 2009. Although some LNAPL has subsequently been detected within
       the wells associated with the LNAPL system, the specific gravity of the LNAPL appears to be
       close to that of water indicating that all LNAPL may not be present as a distinct LNAPL layer
       within the well and LNAPL volumes may be higher than indicated by the LNAPL thickness in a
       well.

    •   OU-2: Soil.  The source control remedy (removal and treatment of contaminated soils)
       commenced in June 1995 and was completed in July 1997. Source removal involved the
       excavation and onsite thermal incineration of approximately 248,000 tons of contaminated soil
       and sediment. The thermally-processed soil from the thermal incineration process was emplaced
       onsite by backfilling an excavation area of approximately 12.5 acres within the  central portion of
       the Site (M&E 1995). All soils excavation and treatment facilities have been decommissioned and
       removed and remediation of onsite soil is considered complete.

-------
    •   OU-3: Sediments in Cochato River. The remedy for OU-3 involved removal of contaminated
       sediments from the Cochato River. This remedy commenced in May 1994 and was completed in
       June 1995. Sediments were dredged to a minimum depth of 6 inches and a maximum depth of 24
       inches along a 2,100-foot reach of the Cochato River. A total of 4,712 cubic yards of sediments
       were removed. A small portion of the riverbed where contaminated groundwater was suspected to
       discharge to the river was backfilled with clean organic fill (approximately 438 cubic yards). The
       ROD also required erosion control,  wetlands restoration, placement of organic fill in the
       excavated areas of the river in the vicinity of the groundwater plume and long-term monitoring of
       downstream portions of the river where sediments were not excavated. To minimize the
       disruption of wetlands, sediments were not to be removed from areas of the river where
       contaminant concentrations were low, calculated risks were low and no impacts were observed.
       Remediation of Cochato River sediment is considered complete. In accordance with the ROD for
       OU-3, long-term monitoring is to be conducted to evaluate remaining contaminant levels and
       their behavior over time (EPA, 1989).

    •   OU-4: Replace Water Supply Due to Closing of South Street Municipal Well Field. The remedy
       for OU-4 called for reopening the Donna Road well field to replace the lost supply resulting from
       contamination of the South Street municipal well field. On August 21, 2003, an Explanation of
       Significant Differences (ESD) document was issued for the groundwater remedy (OU-1)
       specified in the 1986 ROD. The ROD was changed to include excavation of approximately
       400,000 cubic yards  of soil from the Upper Reservoir/Great Pond located in Braintree and
       Randolph to provide additional storage capacity, resulting in an estimated additional supply of
       0.31 million gallons per day (MOD) to be used in the interim to supplement the community's
       drinking water until the groundwater remedial action was complete. An ESD was also issued in
       August 2003 for OU-4 stating that, due to expansion of the water capacity in the Upper
       Reservoir/Great Pond, the reactivation of the Donna Road well field was not necessary, and no
       further action would be taken for OU-4.

Thus, the only OU with continuing active remediation is OU-1 (with ongoing monitoring anticipated for
OU-3). Until June 2004, EPA was responsible for the long-term response action (LTRA) at OU-1,
including the P&T system, monitoring (groundwater, surface water, sediment, fish and wetlands),
evaluation of long-term protectiveness of the remedies and the need for institutional controls (ICs). In
June 2004, after the 10 year LTRA period, MassDEP assumed responsibility for operations and
maintenance (O&M) of the OU-1 remedy. In 2005,  EPA issued an  ESD to incorporate comprehensive ICs
into the OU-1 and OU-2 remedies.
2.3     POTENTIAL HUMAN AND ECOLOGICAL RECEPTORS

Site documents indicate that exposure to contaminated groundwater, soil, sediments and fish tissue are the
primary potential pathways for human exposure to site-related contamination. The third Five-Year
Review indicates that exposure to contamination from the vapor intrusion (VI) pathway could be a
concern if contamination remains in place and the site is developed, but also notes that site development
may be discouraged because much of the site is within the  100-year flood plain and or is wetlands. Based
on previous site documents, human risks associated with exposure to surface water were determined to be
sufficiently low to be protective of human health and the environment either due to low levels of
contamination or incomplete exposure pathways.

-------
2.4     EXISTING DATA AND INFORMATION

The information provided in this section is intended to represent data already available from existing site
documents. Interpretations included in this section are generally interpretations from the documents from
which the information was obtained. The optimization review team's interpretation of this data is
discussed in Sections 4.0 and 5.0.

2.4.1        SOURCES OF CONTAMINATION

Baird & McGuire, Inc. was a chemical mixing and batching company that operated from 1912 to 1983.
The most prominent site-related contaminants currently observed in groundwater are arsenic, SVOCs
(primarily naphthalene), and pesticides. VOCs are present but are below cleanup standards in most
sampling locations. Contamination stems from plant operations as well as disposal components and
practices that included:

   •  laboratory sinks that drained indirectly to a nearby surface water
   •  storage tanks overflowed and leaked
   •  an uncovered "beehive" cesspool
   •  an unlined and undiked tank farm,
   •  breach of a creosote collection lagoon

Although these aboveground sources have been addressed by historic remedial activities, ongoing sources
of groundwater contamination likely remain in the subsurface. LNAPL, in the form of free and or residual
product, and contaminated saturated soil beneath the soil excavation remedy likely serve as potential
continuing sources for SVOCs,  pesticides and arsenic (that is, the LNAPL contains SVOCs, pesticides
and arsenic). In addition, buried soil and ash from previous site excavation and incineration have elevated
arsenic concentrations (incineration did not removed or destroy the arsenic) and may serve as a
continuing source of arsenic to groundwater under certain conditions.

2.4.2        GEOLOGY SETTING AND HYDROGEOLOGY

Prior to site excavation, the subsurface at the Baird & McGuire site was mainly glacial outwash
overburden which extended from the surface to fractured bedrock at  an elevation of approximately 129 ft
above MSL to the west  and approximately 20 ft above MSL to the east. Maps of bedrock elevation are
provided in Figures 7 and 7a of a 1985 geophysical investigation (GHR, 1985/1986a), and geologic cross-
sections are presented in Figures 4-1, 4-2, and 4-3 of the RI (see Attachment A). The majority of the
glacial outwash is fine to coarse sand underlain by glacial till. Fine sands and silt underlay the river. In the
wetland and topographically low areas of the site, the glacial deposits are overlain by organic soils. In the
eastern portion of the site, near the Cochato River, the total thickness of overburden material is
approximately 50 ft (GHR 1986).

Based on information in the FS  (GHR, 1985/1986a), average values  of hydraulic conductivity of the
principal overburden units at the site are 1  x 10"3 centimeters per second (cm/sec) for silty sands, sand and
silt; 1.6 x 10"2 cm/sec for fine to medium and fine to coarse grained sands; and 3.5 x 10"3 cm/sec for
glacial till. The RI reported that hydraulic conductivity of bedrock fractures from packer testing ranged
from 3.3  x 10"3 cm/sec to 7.0 x  10"1 cm/sec, indicating variability in bedrock competence. The vertical
extent of fractured bedrock is also variable, ranging from a few ft in  many areas to significantly deeper in
other areas. The ash from excavation and onsite incineration was re-deposited onsite to reshape the
landscape similar to its prior geomorphology. During the optimization review site visit, it was stated that

                                               10

-------
the ash is highly heterogeneous, and no tests to date have been performed on the permeability of the
backfilled ash. It was also stated that the "ash" primarily consists of native soil particles and materials that
were not combusted and, thus may give a false impression that the material is very fine clay-like material.

Groundwater elevations at the site range from approximately 130 ft above MSL in the west to
approximately 120 ft above MSL in the east, with flow toward the Cochato River. Depth to groundwater
in the area of OU-1 ranges from the ground surface (adjacent to the river and in the wetlands) to
approximately 50 ft below ground surface (bgs) near EW-8. The P&T system is intended to capture
impacted groundwater prior to discharge to the Cochato River, but no detailed capture zone evaluation
(including full plume delineation) is available to adequately determine the extent of hydraulic capture that
is currently achieved. Potentiometric surface maps prepared by CHES for overburden and bedrock under
pumping are presented in Figures 3 and 4 from the 4th Quarter 2011 Quarterly Extraction Well Report
(see Attachment A).

Site hydrogeology is described further in Sections 4.0 and 5.0.

2.4.3       GROUNDWATER CONTAMINATION

Recent sampling, including the July 2011 sampling event, indicates that naphthalene  is the predominant
SVOC remaining in groundwater. Figure B-l in Attachment B illustrates the extent of SVOCs sampling
in July 2011. Figure B-2 in  Attachment B illustrates the extent of arsenic contamination in groundwater in
July 2011. Figure B-3 in Attachment B illustrates the extent of pesticides in groundwater in July 2011.
Each of these figures also indicates the monitoring wells that had observable LNAPL in 2009 or 2010.
VOCs were detected in several site  monitoring wells at concentrations less than an order of magnitude
above their respective cleanup standards.

LNAPL extent and thickness was investigated in 1997 (see Figure B-4 in Attachment B). Direct-push
borings, temporary piezometers and monitoring wells were used in addition to visual observation,
photoionization detectors, Sudan dye,  and ultraviolet (UV) fluorescence. Focus was placed on evaluating
the extent of measurable LNAPL in the interval from 6 ft above to 4 ft below the water table. Significant
LNAPL collection has occurred since  this time. Although the extent of measureable,  mobile LNAPL is
limited based on current gaging events (for example, Figure B-4 in Attachment B also indicates the
limited observations of LNAPL between October 2009 and September 2010), there may still  be
significant extent of residual LNAPL.

2.4.4       COCHATO RIVER SEDIMENT/SOIL AND SURFACE WATER CONTAMINATION

Based on site reports,  sediment/soil and surface water sampling events have included:

   •   Sediments sampled in 1996, 1997, and 1998 by the U.S. Army Corps of Engineers (USAGE).

   •   Sediments and fish  sampled in 1999 by Battelle under contract to USAGE.

   •   Sediment, surface water and fish sampling was taken over by M&E under contract to EPA in
       2000.

   •   Sediment, surface water and fish sampling performed by M&E in 2001 and 2002.

   •   Three surface water samples (RS-1 through RS-3) were collected from the Cochato River in
       conjunction with the annual sampling event that began on July 26, 2010. Sample RS-1  was

                                             11

-------
       collected upstream of the site's property line as a background sample for arsenic analysis; sample
       RS-2 was collected approximately 25 ft downstream from monitoring well MW97-10 for arsenic
       analysis; and sample RS-3 was collected from the river at a location approximately even with
       monitoring well BM-3 IB and analyzed for pesticides. The samples were collected using a
       peristaltic pump and dedicated tubing for each sample location. No detectable concentrations
       above the respective detection levels were reported, and the detection limits were all below the
       Maximum Contaminant Level (MCL) or GW-1 Standard.

Contaminants of concern detected in Cochato River sediments within the project area include VOCs,
polynuclear aromatic hydrocarbons (PAHs) (which are a subset of SVOCs), pesticides (including
dichlorodiphenyltrichloroethane [DDT] and chlordane), and arsenic. Sediments and fish tissue sampling
in the Cochato River have not occurred since 2002. However, sediment and surface water sampling was
conducted in 2011 for arsenic in the unnamed brook at the site that discharges to the Cochato River.

The Third Five-Year Review states:

        "The second five-year review concluded that there was likely negligible risk to human
       recreational receptors exposed to surface water impacted by the site, based on sampling data
       collected in 2000. No further surface water sampling was recommended based on this conclusion.
       Surface water data from 2000 are compared... to  2009  tap water risk-based screening levels
       (EPA, 2009), adjusted upward by a factor of 40 to account for differential ingestion of tap  water
       and surface water while swimming (2 liters per day for tap water vs.  0.05 liters per swimming
       event). This comparison confirms that there is negligible risk associated with surface water
       exposure and corroborates the 2004 conclusion that no further surface  water sampling is
       required."

Sediment sampling results are discussed further in Sections 4.0 and 5.0.
                                               12

-------
    3.0   DESCRIPTION OF PLANNED OR EXISTING REMEDIES
The information provided in this section is intended to represent information already available from
existing site documents. Interpretation included in this section is generally interpretation from the
document from which the information is obtained. The optimization review team's interpretation of this
information and evaluation of remedy components are discussed in Sections 4.0 and 5.0 of this report.
3.1     REMEDY AND REMEDY COMPONENTS

3.1.1        SOIL REMEDIATION

The Third Five-Year Review describes the implemented soil remedy (OU-2 remedy) as follows:

   The source control remedy (removal and treatment of contaminated soils) commenced in June 1995
   and was completed in July 1997. All soils excavation and treatment facilities have been
   decommissioned and removed. To summarize, the OU-2 remedial activities consisted of the
   following:

       •  Approximately 248,000 tons of soil and sediment were excavated and treated by on-site
          incineration. Soils were excavated to approximately one foot below the seasonal low water
          table within the excavation limits, with excavation depths ranging from approximately 3 to 33
          ftbgs;

       •  Approximately 250,000 tons of the treated soil (ash) was backfilled into the 12.5-acre
          excavation area (shown in Figure 1 of the Evaluation of Potential Future Reuse Opportunities
          for the Baird & McGuire Site, see Attachment A of this report);

       •  Toxicity Characteristic Leachate Potential (TCLP) tests were performed on the ash, and
          approximately 320 tons of ash which failed the leaching criteria were stabilized with cement
          prior to backfilling to reduce the potential for leaching of contaminants;

       •  The incinerator building and equipment were demobilized and removed from the site and the
          incinerator building foundation was crushed and buried on-site; and

       •  Approximately 7.4 acres of forested and scrub/shrub floodplain wetlands underwent onsite
          restoration, including a small peat bog and 1,000 linear ft of the unnamed brook.

   EPA and M&E concluded from the site visit conducted for the First Five-Year Review that, although
   the wetland was not restored with the organic  soils recommended in the Final Restoration Plan, the
   mitigative measures required by EPA and USAGE were met. Initially, the wetland was monitored
   annually in order to assess the success of the wetland restoration effort. It was reported that during a
   site visit on June 23, 2009, it appeared that the restored wetland was well established and in good
   condition.
                                             13

-------
3.1.2       SEDIMENT EXCAVATION

The Third Five-Year Review describes the implemented sediment remedy (OU-3 remedy) as follows:

   The remedy for OU-3 involved removal of contaminated sediments from the Cochato River.
   This remedy commenced in May 1994 and was completed in June 1995. Major components of
   the sediment remedy were site preparation, sediment dredging, placement of organic fill and
   monitoring.

   In preparation for river excavation, the river banks were cleared and grubbed. A detention
   basin was built in the river just downstream of the  Union Street bridge to  trap suspended
   sediments during dredging and then subsequently removed. Temporary haul roads were
   constructed and then removed after testing showed no residual contamination. Sediments
   were dredged from a 2,100-foot reach of river extending from the Baird & McGuire Site to
   the Union Street bridge. Sediments were dredged to a minimum depth of six inches and a
   maximum depth of 24 inches in some areas. Dredged material was placed in scalable
   containers and transported to  the Baird & McGuire exclusion zone where it was stored for
   subsequent incineration. A total of 4,712 cubic yards of material were removed from the
   river. Dredged material was transported to the incineration facility, incinerated, and placed
   as backfill within the OU-2 soil excavation area. Wetlands adversely impacted by the
   dredging and the installation of haul roads were restored under the OU-2 Final Restoration
   Plan.

   The portion of the river where contaminated groundwater underlies the riverbed was
   backfilled with approximately  438 cubic yards of clean organic fill.  This organic fill was
   intended to act as a filter to attenuate concentrations in contaminated groundwater that
   might discharge into the river.

   Following completion of the remedy, EPA implemented a long-term monitoring plan for the
   Cochato River downstream of the dredged area,  including analyses of sediment and fish. The
   plan included collection and analysis of sediment samples annually for the first five years and
   fish samples every 5 years, followed by a review  of the data and trends. Sediment and fish
   tissue samples were last collected from  the Cochato River in 2002.

3.1.3       EXTRACTION SYSTEM

The groundwater treatment and extraction systems were installed in 1993, and with the exception of the
discontinued use of two extraction wells and several  treatment train components, have been in use since
1993. During the onsite soils remedy (1993-1997) the treatment plant was primarily used to treat the
discharge from the onsite incinerator and the dewatering water from deep excavations.

The original extraction system included six  groundwater extraction wells (EW-1 to EW-6). EW-1 was
decommissioned due to low well yield and minimal contaminant removal. In  1998, EW-7 was installed
and continues to be in operation. EW-8 was added in 1999 in an area of pooled LNAPL. EW-4 was
replaced with EW-4A in 2004 based on groundwater model simulations that suggested EW-4A would
provide improved contaminant recovery. EW-9 was also added in 2004 to extract high levels of
contamination  in the northern portion of the site, but EW-9 extracts very little water relative to the
expected extraction rate of 10 gpm. Operation of EW-2 was discontinued in 2006 and operation of EW-5
was discontinued in 2011. Discontinuation of these wells was due to problems with the wells rather than a
decrease in mass removal. The wells pump the groundwater via separate pipes to an extraction well

                                             14

-------
control building, located south of the extraction system, where the water converges to a single header pipe
that conveys the water to the groundwater treatment facility (GWTF). All extraction system controls (for
example, valves, flow meters, electrical switches) are housed within the extraction system control
building. The wells are operated remotely through use of a programmable logic controller (PLC) located
at the GWTF. Each pump motor has a variable frequency drive.

The extraction well locations are shown in Figure 2, 7 and  7a provided in Attachment A. The following
table provides the extraction rates and contaminant concentrations for the operating extraction wells in
December 2011, as reported in the 4th Quarter 2011 Quarterly Extraction Well Report.

Table 3-1. Extraction Well Rates and Influent Concentrations from December 2011
Well
Typical Flow
Rate (gpm)
MCP Method 1 GW-1 Standard*

EW-3
EW-4
EW-6
EW-7
EW-8
EW-9

3.5
18.1
2.1
26.4
8.3
0.63
Arsenic
Concentration
(Hg/L)
10

517
469
200**
305
326
4,460
Naphthalene
(Hg/L)
140

385
531
258

-------
    •   pH neutralization tanks (no longer required as pH adjustment is no longer needed for metals
       removal)
    •   air strippers converted from activated sludge or biological clarifier units
    •   pressure filter feed tank
    •   pressure filters
    •   liquid phase GAC units for removal of organic contaminants from process water
    •   vapor phase GAC units for removal of organic contaminants from air stripper and process tank
       off-gas
    •   effluent tank

Water from the pressure filter feed tank is sent in semi-batch mode through the pressure filters and
carbon. The treated water is discharged to one of four infiltration basins (on a rotating basis) at
approximately 150 gpm.

A conceptual schematic of the treatment process is presented in Figure 2A of the 2009/2010 Annual
Report (see Attachment A). Individual treatment processes and the typical pathway of water through the
system are also shown; however, pumps, system controls and pathways for recycling of process water are
not shown.

3.1.5        LNAPL RECOVERY SYSTEM

As an enhancement to the groundwater extraction and treatment systems, a system to recover LNAPL was
installed in 1999. The system was designed to pump directly from three wells (EW-8, MW-97-1 and
MW-98-1) through an oil-water separator to a collection tank. Recovered LNAPL is disposed off-site.
Until June 2004, the LNAPL was mixed with an absorbent (crushed corncobs) prior to off-site disposal.
Starting in June 2004, the State shipped the LNAPL off-site in liquid form. Due to the difficulty in
separating emulsified LNAPL from water, the LNAPL system has not been operated in its original form
for the past few years. LNAPL is occasionally removed with absorbent material on an intermittent basis.
3.2     REMEDIAL ACTION OBJECTIVES AND STANDARDS

3.2.1       GROUNDWATER

The remedial action objectives (RAO) for OU-1 groundwater are:

   •  Remediate the contaminated aquifer within a reasonable time period to prevent present or future
       impacts to groundwater drinking supplies;

   •  Protect surface waters from future contaminant migration; and

   •  Minimize long-term damage and or maintenance requirements.

The goal of the extraction and treatment system as documented in the ROD (dated September 30, 1986) is
to contain and remediate the groundwater "within a reasonable time" and to protect groundwater and
surface water. Specific cleanup levels were not specified in the ROD, but the ROD specifies that the
aquifer is a possible source of drinking water. The GWTF was designed to treat groundwater to meet Safe
Drinking Water Act (SDWA) MCLs, which are intended to protect public health and the environment.
Initially, after five years of operation, the EPA was to determine if the restoration target levels are

                                             16

-------
achievable and if they are adequate to protect public health and the environment. EPA has been using
MCLs as target cleanup levels. Currently, plant effluent discharge standards must be below the MCLs, or
when no MCL is given, the applicable standard is based on the MCP Method 1 GW-1 Risk Standards
(GW-1 Standards). For contaminants that have an MCL, the GW-1 Standard equals the MCL. Therefore,
it is appropriate to refer to the GW-1 Standards for the purpose of this report. Table 3-2 provides the GW-
1 Standards for contaminants of concern:
Table 3-2. GW-1 Standards for Contaminants of Concern
Contaminant
Metals
Arsenic

Pesticides
4-4 ODD
Chlordane
Dieldrin

GW-1 Standards
(Hg/L)

10*


0.2**
2*
0.1**










Contaminant
VOCs
Benzene

SVOCs
2-Methylnaphthalene
Acenaphthene
Naphthalene
Pentachlorophenol
GW-1 Standards
(Hg/L)

5*


10**
20**
140**
1*
*MCL equals GW-1 Standard
**NoMCL
3.2.2
SEDIMENTS
The remedial action objectives for site sediments include:

   •   Reduce human exposure to arsenic, DDT, PAHs, and chlordane in sediment by excavating to an
       average depth of six (6) inches and by achieving the following levels of contaminants, which
       correspond to a 1 x 10"5 to 1 x 10"6 excess cancer risk level;

Table 3-3. ROD-Specified Human Health Target Levels for Sediment Contaminants of Concern
Compound
Arsenic
Total DDT
Total Chlordane
Total PAHs
Target level (10~5 risk) (mg/kg)
2,500
190
50
22
Target level (10~6 risk)
(mg/kg)
250
19
5
2.2
    •   Reduce environmental exposure to the same 4 contaminants of concern to concentrations
       corresponding to the mean sediment quality criteria (SQC) in the river bed, and to the upper
       bound SQC in the wetland area north of ice pond.

The ROD anticipated that natural degradative, depositional, and dispersal processes will gradually reduce
contaminant concentrations in the sediment  and that sampling in the areas of excavation, in conjunction
with long-term monitoring of downstream portions of the Cochato River that were not excavated, would
confirm the remaining contaminant levels and their behavior overtime.

The 2009 Five Year Review evaluated the current risk based on updated risk assessment data. Due to
changes in the risk assessment methods and assumptions that occurred since 1986, including new toxicity
information and the requirement to evaluate compounds with mutagenic modes of action, the potential
                                              17

-------
risks associated with the 1989 cleanup goals were evaluated. The risks associated with the sediment
cleanup goals using this updated information, as reported in the FYR, were as follows:

Table 3-4. 2009 Revised Risk Estimates Associated with 1989 Sediment Cleanup Goals

Arsenic
Total DDT
Total Chlordane
Total PAHs
1989 OU-3 ROD
Cleanup Goals (mg/kg)
250
19
5
22
2009 Third Five- Year Review
Risk Associated with 1989 Cleanup
Goal
(mg/kg)
6xlO'5
1 x 10'6 (See note 1)
Less than 1 x 10~6 (See note 2)
1 x 10'4 (See note 3)
Notes
1. The 2009 Third Five-Year Review shows that the concentration associated with 1 x 10'6is 20 mg/kg, or approximately
       the same as the 1989 cleanup goal.
    2.  The 2009 Third Five-Year Review shows that the concentration associated with Ix 10'6 is 19 mg/kg which is greater
       than the 1989 cleanup goal of 5 mg/kg. Therefore the risk associated with the 5 mg/kg goal is less than 1 x 10'6.
    3.  The risk estimate for PAHs is overly conservative because it is based on the assumption that all PAHs present are the
       most toxic compound (benzo[a]pyrene). PAHs of lesser toxic potency are likely to be most prevalent.

The optimization review team notes that specific limits to be used for evaluating fish tissue sampling
results moving forward are not clear with respect to values, or with respect the  specific source, basis and
or methodology for calculation of the limits. However, the site team indicated that the intent is to evaluate
site-specific risks  relative to an acceptable excess cancer risk in the range of 1 x 10~4 to 1 x 10~6.
3.3     PERFORMANCE MONITORING PROGRAMS

3.3.1        GROUND WATER

The monitoring network consists of 66 monitoring wells screened in the glacial overburden, 13
monitoring wells screened in the underlying bedrock and the operating extraction wells. Water levels are
measured quarterly from the monitoring wells, and the measurements are used to develop separate
potentiometric surface maps for the overburden and bedrock.

The 2009-2010 Annual Report indicates that seven extraction wells are sampled on a quarterly basis and
21 monitoring wells are sampled on an annual basis with low-flow sampling. All samples are analyzed for
field parameters (pH, conductivity, temperature, dissolved oxygen, ORP, and turbidity). All operating
extraction wells are sampled for SVOCs, pesticides and arsenic. The suite of analyses conducted on the
monitoring well samples vary from well to well but typically include one or more of the following
analyses: VOCs, SVOCs, pesticides, arsenic and mercury. In 2011, the site team conducted a more
comprehensive  sampling event.  Samples were collected from all operating extraction wells (5 wells in
2011) and from approximately 60 monitoring wells.  All samples were analyzed for metals (including
arsenic and mercury), pesticides, SVOCs and VOCs. The scope of the monitoring program on a move-
forward basis is uncertain at this time.
                                               18

-------
3.3.2       SEDIMENT AND FISH TISSUE SAMPLING

Long-term monitoring of sediments in the Cochato River was performed on an annual basis from 1996 to
2002. The OU-3 ROD called for long-term monitoring of sediments in portions of the Cochato River
downstream of the portion of the river where sediments were excavated as part of the remedy. Long-term
monitoring has also included analysis of fish tissue in order to monitor the impact of the sediments on the
fish population. Fish tissue sampling was conducted in 1992, 1996 and annually from 1999 through 2002.
Surface water samples were collected from the Cochato River in 2000 to establish baseline surface water
quality for the project.

Based on data trends identified from samples collected between 2000 and 2002, a sediment and fish tissue
sampling frequency of every five years was recommended. No further surface water sampling was
recommended in the Second Five-Year Review. No additional sediment or fish samples from the Cochato
River have been collected since 2002.

The Third Five-Year Review recommended that additional sediment samples be collected to determine if
long-term cleanup goals are being attained. In addition, fish tissue sampling was also recommended in
order to determine concentration trends and confirm concentrations due not cause an unacceptable risk. In
the interim, warning signs installed along the river cautioning recreational users about the potential
dangers associated with the ingestion offish caught from the river are expected to be maintained to
comply with the Department of Public Health advisory for pesticides
                                              19

-------
                       4.0   CONCEPTUAL SITE MODEL
This section discusses the optimization review team's interpretation of existing characterization and
remedy operation data and site visit observations to explain how historic events and site characteristics
have led to current conditions. This CSM may differ from that described in other site documents. CSM
elements discussed are based on data obtained from the site team and discussed in the preceding sections
of this report, and in some cases is based on speculation of the optimization review team. This section is
intended to include interpretation of the CSM only. It is not intended to provide findings related to
remedy performance or recommendations for improvement. The findings and recommendations are
provided in Sections 5.0 and 6.0, respectively.
4.1     CSM OVERVIEW

Operations from a chemical mixing and batching facility over a 70-year history resulted in releases to soil
and groundwater from leaking above-ground and below-ground tanks, waste disposal to the land surface,
and other sources. Releases of site-related contamination to the Cochato River included direct discharges
from pipes, contaminated surface water runoff, contact of flood waters with waste disposal areas and
discharge from groundwater to surface water. Contaminants included (but were not limited to) VOCs,
SVOCs, pesticides, and arsenic.

Site conditions have improved significantly due to a combination of factors that include the following:

    •   Discontinuation of site operations by 1983
    •   Removal actions performed by EPA
    •   Soil excavation
    •   Sediment excavation
    •   P&T operation

Soil contaminated with organic compounds (VOCs, SVOCs, pesticides) is  no longer present in
unsaturated soil and there does not appear to be a continuing source of groundwater contamination from
unsaturated soil for these specific contaminants. Contaminated river sediments as of the last sampling
event in 2002 were orders of magnitude lower than concentrations detected during  the investigation stage.

With only a few exceptions, the VOC groundwater plume (excluding naphthalene,  which is also analyzed
as an SVOC) has been remediated below applicable standards. Similarly, concentrations of SVOCs
(predominantly acenaphthene, naphthalene and 2-methylnaphthalene) are generally more than 10 times
above standards within 200 ft of EW-8 (see Figure B-l in Attachment B), and pesticides are generally
only above standards within 200 ft of EW-8 (see Figure B-3 in Attachment B). Therefore, the  remaining
contamination at the site that drives current remediation efforts is the LNAPL and the dissolved arsenic
plume (see Figure B-2 in Attachment B).

It is unclear if the historic extent of measureable LNAPL (see Figure B-4 in Attachment B) was due to
overland transport followed by infiltration, subsurface migration as a separate phase product, or a
combination of both. LNAPL recovery by extraction and oil-water separation was conducted up through
approximately 2009 with decreasing yield. During the site visit, the site team described the remaining
LNAPL as having a specific gravity near 1.0 and as emulsified in groundwater, making LNAPL

                                              20

-------
measurement and LNAPL recovery by extraction and separation difficult. Residual (immobile and
unrecoverable) LNAPL is also likely still present beneath the water table through much of the area where
LNAPL was identified in the 1997 investigation. Laboratory analysis of an LNAPL sample from EW-6 in
2011 indicated that the sample was comprised of approximately l%pesticides, l%PAHs, 0.1% VOCs,
and 0.01% arsenic by mass. The remaining mass is likely water and total petroleum hydrocarbons (TPH).
LNAPL observed in different portions of the site may have different compositions if it originated from
different source areas. For example, LNAPL near EW-6 contains pesticides and PAHs based on the 2011
analyses, and these contaminants are detected in groundwater samples from nearby monitoring wells. By
contrast, LNAPL was historically identified in the vicinity of wells MW-97-12, MW-97-21 and MW-97-
22 (GP-3, GP-3A, GP-3C, and GP-6.5 from the 1997 study), and pesticides are not detected in these
wells. PAH concentrations and VOC concentrations are also low in these monitoring wells suggesting
that degradation has occurred over time, but the ORP is still very low (around -100 millivolts [mV]) and
dissolved iron is very high, indicating the presence of substantial degradable organic compounds in this
area. The degradable organic compounds could be residual petroleum hydrocarbons associated with
previously observed LNAPL or could be from the nearby wetlands. The 1997 investigation focused on
LNAPL thickness and the potential for LNAPL recovery. The known extent of LNAPL contamination at
the time of the investigation is shown in Figure B-4 in Attachment B, but it is unclear if LNAPL was
present outside of this area. The current extent of residual LNAPL and dissolved organic compounds
throughout the site are not well understood.

While concentrations of naphthalene, other PAHs and VOCs have declined substantially throughout the
site, the dissolved arsenic plume continues to exhibit high concentrations throughout the plume. Arsenic
concentrations have decreased mildly at some locations over time, though not nearly as much as the
organic contaminants. The dissolved arsenic plume extends from the principal source area in the vicinity
of EW-8 to the Cochato River. Therefore, the mechanisms responsible for the substantial PAH and VOC
remediation (for example, the soil remedy, LNAPL collection, P&T and biodegradation) have had a less
substantial effect on arsenic contamination. Potential sources of observed arsenic groundwater
contamination include remaining LNAPL (free and or residual product), contaminated soils beneath the
excavation remedy, native soils and potentially ash deposited on-site after the soil remedy. Arsenic is
tightly bound to iron hydroxides in the subsurface, but reducing conditions (low ORP) can mobilize iron
(as evidenced by high dissolved iron concentrations in groundwater) and the arsenic previously adsorbed
to it.

The optimization review team speculates that the remaining organic contamination (VOCs, SVOCs, and
potentially other petroleum hydrocarbons) serves as electron donor for microbes  in groundwater and
decreases the ORP in much of the aquifer. The optimization review team further  speculates that the lower
ORP mobilizes iron within the soil, effectively mobilizing arsenic that was adsorbed to that iron in native
soils and or soil remedy ash. To the extent these speculations are correct, as long as sufficient dissolved
organic carbon is present in groundwater, widespread continuing sources of arsenic will persist. The
wetlands may also contribute to reducing conditions. The relative contributions of arsenic from native
soils, contaminated saturated soil not fully addressed by the excavation, soil remedy ash and LNAPL
cannot be  readily determined. Based  on data from the 2009-2011 Arsenic Investigation (Clean Harbors
Environmental Services, Inc., 2011), the soil remedy ash generally has a higher arsenic concentration than
native soils; however, arsenic mobilization from native soils is likely sufficient to cause arsenic
concentrations in groundwater above applicable standards. For example, TCLP testing of an arsenic soil
sample from ASB-22 yielded a concentration of 0.534 milligram per liter (mg/L) of arsenic, and the low
ORP of the site groundwater is also likely effective at mobilizing arsenic. The arsenic plume is not fully
delineated, and arsenic contaminated groundwater appears to have been discharging to the river for more
than a decade, particularly in the area of EW-9 and potentially between EW-9 and EW-7.
                                              21

-------
The goal of the groundwater remedy is to return the aquifer to drinking water standards. Much of the site
is within the  100-year flood plain and or is wetlands, which limits future use of the land or underlying
water resource. The Cochato River is the only current potential exposure pathway to human or ecological
receptors.
4.2     CSM DETAILS AND EXPLANATION

4.2.1       GROUNDWATER

Role ofORP in Arsenic Groundwater Contamination

The VOC and SVOC trends at several wells provided in the 2004 Evaluation of Groundwater
Remediation Progress (see Attachment C) provide an indication of the success of various remedy
components, as follows:

    •  VOC concentrations at EW-2, EW-4 and EW-5 decreased by two orders of magnitude between
       1995 and 1997, presumably as a result of the soil remedy and associated groundwater extraction.

    •  VOC concentrations at EW-3 and EW-6 started a gradual decline since the wells became
       operational in 1994.

    •  VOC concentrations at EW-7 and EW-8 have also significantly declined.

    •  VOC concentrations at downgradient wells MW-97-11 and MW-97-12 also declined significantly
       following the soil remedy.

    •  Similar trends have been observed for SVOCs, with the exception that SVOCs generally remain
       elevated closer to the source area (EW-3, EW-4a, EW-6 and EW-8) and the immediately
       surrounding monitoring wells.

By contrast, arsenic concentrations have remained elevated well above the arsenic cleanup standard of 10
(ig/L in many locations, including areas where naphthalene concentrations have declined to well below
the naphthalene  cleanup standard of 140 (ig/L. In some locations the arsenic concentrations have
remained stable  and at other locations the arsenic concentrations have decreased but remain significantly
above applicable standards. Two examples are provided:

    •  MW-97-21 (located close to the Cochato River, just upgradient from EW-7) - Arsenic
       concentrations at MW-97-21 have remained above 1 mg/L.  The arsenic concentrations in
       groundwater have declined (from 2,200 (ig/L in April 2002  and 1,310 (ig/L in April 2004 to
       1,150 (ig/L in July 2010 and 989 (ig/L in July 2011) but remain well above the arsenic cleanup
       standard of 10 (ig/L, whereas the naphthalene concentrations in groundwater declined more
       substantially over the same period (from 1,200 (ig/L in April 2002 and  560 (ig/L in April 2004 to
       55 (ig/L in July 2010) and are well below the naphthalene cleanup standard of 140 (ig/L. Data
       from the 2011 Draft Arsenic Summary Investigation Report - Part II/IIA (Clean Harbors
       Environmental Services, Inc., 2011) indicate that groundwater at ASB-12 (in the vicinity of MW-
       97-21) is in contact with soil remedy ash that has an arsenic concentration of 29.6 milligrams per
       kilogram (mg/kg). The ORP at MW-97-21 was -100.4 mV in July 2010 and -111 mV in July
       2011. The iron in groundwater at MW-97-21 is also elevated (16 mg/L), indicating that iron, that
       might otherwise adsorb arsenic, has been mobilized. The combined VOC and SVOC
       concentration (VOC + SVOC) is approximately 200 ug/L. This relatively small degree of VOC +
       SVOC contamination is not likely the sole driver of the low ORP. Potential contributors to the
       reducing conditions may include VOC or SVOC tentatively identified compounds (TICs) that are


                                             22

-------
       not reported by the laboratory, TPHs (which are not analyzed for) or organic matter from the
       wetlands.

    •  MW-97-17 (located near the predominant source area, just east of EW-8) - The arsenic
       concentration in 1998 at MW-97-17 (further upgradient from MW-97-21) remain have remained
       stable (from 470 (ig/L in April 2002 and 390 (ig/L in April 2004 to 425 (ig/L in June 2010) well
       above the arsenic cleanup standard of 10 (ig/L, whereas the naphthalene concentrations in
       groundwater declined substantially over the same period (from 420 (ig/L in April 2002 and 200
       (ig/L in April 2004 to 6 (ig/L in June 2010) and are well below the naphthalene cleanup standard
       of 140 (ig/L. Samples of soil ash are not available for this location. The ORP at MW-97-17 was -
       105 mV in July 2010 and -54.7 mV in July 2011. The VOC and SVOC concentrations at this
       location are even lower than those at MW-97-21, and the monitoring point is not co-located with
       wetlands. VOC, SVOC or TICs that are not reported by the laboratory or TPHs (which are not
       analyzed for) are likely the cause of the low ORP.

Figures B-5 through B-8 (See Appendix A) illustrate the relationship between ORP and arsenic and iron
mobilization in the vicinity of these two wells and several other wells. One of the other wells is MW-97-
20, for which the ORP is higher and the arsenic and iron concentrations are significantly lower. Figure B-
9 plots the ORP vs. arsenic concentration for the July 2011 sampling data. The following observations
and interpretations are noteworthy:

    •  For samples collected from unconsolidated material within the former excavation, low ORP (for
       example, less than -50 mV) correlates to high arsenic concentrations.

    •  Samples with ORP above -50 mV have low arsenic concentrations and samples with ORP above
       0 mV have generally undetectable arsenic.

    •  Samples of bedrock groundwater have very low ORP and no arsenic. These results confirm that
       arsenic is not present in the bedrock groundwater. The low ORP of the bedrock is likely due to
       the geologically old groundwater that has low dissolved oxygen and a low ORP resulting from
       interactions with various mineral species rather than microbial metabolism of organic
       contaminants.

The strong correlation between arsenic and ORP shows a relationship, but does not necessarily demonstrate
that the low ORP is the cause of the high arsenic. For example, it is possible that the LNAPL is the cause of
the high arsenic and also provides organic compounds that foster microbial activity and lower the ORP.
However, the documented effect that low ORP has on mobilizing iron  and arsenic suggests that there likely
is a causal relationship.  The low ORP might be a potential mechanism for releasing adsorbed arsenic and is
also likely a cause for inhibiting dissolved arsenic from adsorbing to soils.

Although the 2011 arsenic investigation included Synthetic Precipitation Leaching Procedure (SPLP)
testing of the ash from various locations, the SPLP test considers reduced pH but does not consider a
lower ORP. Therefore, the SPLP testing may not have accurately represented the potential for arsenic
mobility at this site.  One TCLP test (on ash from ASB#22), which uses a lower pH than the SPLP test but
also does not consider a low ORP, resulted in leaching 0.5 mg/L of arsenic from site soils, suggesting the
potential for some arsenic to be mobilized from some site soils.

Distribution of Arsenic

Figure B-2 provides a general plan view of horizontal arsenic distribution. Until the recent arsenic
investigation, the arsenic plume maps did not portray arsenic in the vicinity of soil borings ASB-9, ASB-

                                               23

-------
10, ASB-16, and ASB-22 ("ASB-22 area"). Rather, arsenic was depicted primarily along the area of
known LNAPL extent and as an isolated hot spot near the location of current well EW-9. The
identification of this new area of high-level (greater than 1 mg/L) arsenic groundwater contamination
raises the question as to the source of this arsenic. The following are potential considerations when
evaluating potential sources of this arsenic:

    •  This area was not known to have LNAPL; however, this historic interpretation may be due to the
       general lack of data in the area.

    •  Site soils (both replaced incinerated soil and saturated soil) have high levels of arsenic in this area
       as evidenced by samples from ASB-22. Furthermore, TCLP testing of incinerated soil from ASB-
       22 shows that soil in this area is capable of releasing significant levels of arsenic to groundwater
       under certain conditions. Note that SPLP testing also showed arsenic leaching, but to a much
       lesser extent and below GW-1 Standards.

    •  This area lies directly between the river and the known source area of arsenic near EW-6 and
       EW-4A,  suggesting the potential that arsenic contaminated groundwater could be migrating into
       this area on its way from the source area to the river. Arsenic concentrations over 1 mg/L and low
       ORP (below -100 mV) were observed in samples from MW-97-28 and MW-04-01 during the
       July 2011 groundwater sampling event. These two wells are installed in a location that could be
       considered upgradient of the ASB-22 area.

    •  The observed LNAPL in the area of known LNAPL extent (to the southeast of the ASB-22 area)
       might have migrated by overland flow and subsequent infiltration rather than, or in addition to,
       subsurface  migration. If this is the case, the contamination in the area of known LNAPL extent
       could be due primarily to overland flow, and the contamination in the ASB-22 area could be due
       to the principal direction of groundwater flow coupled with contaminated soils in contact with
       groundwater.

The arsenic investigation also clarifies the vertical distribution of arsenic in groundwater. The highest
arsenic concentrations (over 1 mg/L) were detected between the shallowest sampling  intervals and 20 ft
bgs. All detected arsenic concentrations below 20 ft bgs were below  0.2 mg/L and most were  below 0.1
mg/L, suggesting a significant attenuation of arsenic contamination with depth. The arsenic
concentrations in groundwater at the soil boring ASB-22 location are presented below.
Sample Interval
(ft bgs)
3-5
8-10
11-13
13-15
15-18
18-20
20-23
23-25
25-28
28-30
30-40
Sample Depth Below
Water Table (ft)
At water table
5-7
8-10
10-12
12-15
15-17
17-20
20-22
22-25
25-27
27-37
Arsenic
Concentration (mg/L)
0.697
0.791
NA
2.07
NA
2.92
NA
0.701
NA
0.0254
NA
                                              24

-------
A plume core appears to be present from as shallow as 8 ft below the water table to as deep as 20 ft below
the water table. Elevated concentrations (above 0.7 mg/L) are present above and below this plume core.
The data support the potential for contribution of arsenic from the unsaturated zone, from upgradient, and
or shallow saturated soils.


4.2.2        COCHATO RIVER SEDIMENTS

The Cochato River is the only current potential exposure pathway for human or ecological receptors to
site-related contamination. Some of the contamination may remain in sediments following the sediment
remedy (OU-3 remedy), and some arsenic contamination may continue to discharge to the river from
groundwater.  Due to the absence of consistent sediment sampling, it is difficult to determine if the
discharge of arsenic to the river from groundwater is sufficient to increase impacts to sediment or fish
tissue over time. Conceptually, arsenic that precipitates after discharging to the river could add to
sediment impacts overtime near the site and or downstream from the site. In contrast, arsenic generally is
not expected to bioconcentrate in fin fish. It is also difficult to determine if a discontinuation in pumping
would result in a noticeable difference in sediment arsenic concentrations over time. Due to the
effectiveness of the soil and groundwater remedies, little or no PAH or pesticide contamination appears to
be discharging to the river from groundwater. Sediment sampling results are discussed further in Section
5.0.
4.3     DATA GAPS

There are several data gaps associated with the CSM, including the following:


    •  The extent of residual LNAPL, horizontally and vertically and above and below the water table,
       is unknown.

    •  The extent of arsenic contaminated soil, horizontally and vertically below the water table, is
       unknown.

    •  The extent of the arsenic plume and pathways for arsenic migration are not fully understood,
       including a potential link between the area of wells EW-4A, EW-6 and EW-8 and the area of soil
       borings ASB-4, ASB-9, ASB-10 and ASB-16.

    •  The extent and magnitude of the dissolved organic carbon plume and the primary compounds
       comprising this plume are unknown.

    •  The relative contribution of the wetlands to the  reducing conditions that may be mobilizing
       arsenic is not known.

    •  It is not known if sufficient iron is available in native soils to adsorb all of the arsenic if the ORP
       is increased.

    •  Current contaminant concentrations in river sediments and fish tissue are unknown.

    •  The effect contaminated groundwater has on river sediments and or fish tissue under pumping or
       non-pumping conditions is unknown.
                                              25

-------
4.4     IMPLICATIONS FOR REMEDIAL STRATEGY

Although water quality data suggest that arsenic groundwater contamination drives the remedy, the
optimization review team speculates that the groundwater remedy may actually be driven by low ORP
conditions that either mobilizes arsenic from site soils or allows arsenic from other sources (for example,
the LNAPL) to remain mobile. The optimization review team further speculates that the low ORP
conditions contributing to arsenic mobility are likely the result of residual organic contamination. If these
speculations are correct, timely remediation would require focusing on reducing residual organic
contamination and increasing the ORP in groundwater. If the site team chooses to improve the existing
migration control remedy, a target capture zone needs to be determined. In addition, if the site team
chooses to continue to operate and or upgrade the containment remedy, the contaminant transport
pathways and areas of continuing sources need to be better identified so that extraction wells can be
properly located to provide  long-term migration control.
                                             26

-------
                                5.0    FINDINGS
The observations below are the interpretations of the optimization review team offered as constructive
information in the best interest of the EPA and the public. They are not intended to imply a deficiency in
the work of the system designers, system operators or site managers. These observations have the benefit
of being formulated based upon operational data unavailable to the original designers. Furthermore, it is
likely that site conditions and general knowledge of groundwater remediation have changed over time.
5.1    SOURCES

5.1.1       THE SOIL REMEDY HAS SIGNIFICANTLY REDUCED VOC AND SVOC
           GROUNDWATER CONTAMINATION

See Section 4.0 for details.

5.1.2       RESIDUAL LNAPL THROUGHOUT MUCH OF THE SITE MAY CONTINUE TO SERVE
           AS A SOURCE OF LNAPL AND DISSOLVED ORGANIC CARBON

See Section 4.0 for details.

5.1.3       Low ORP (POTENTIALLY CAUSED BY RESIDUAL DISSOLVED ORGANIC CARBON)
           MAY BE MOBILIZING ARSENIC FROM SITE SOILS AND SOIL REMEDY ASH AND is
           ALLOWING ARSENIC IN GROUNDWATER TO REMAIN MOBILE

See Section 4.0 for details.
5.2    GROUNDWATER


5.2.1       LNAPL DELINEATION

The extent of residual LNAPL has not been delineated. See Section 4.0 for more information.

5.2.2       PLUME DELINEATION

The arsenic plume and migration pathways are not clearly understood because significant arsenic impacts
between EW-7 and EW-9 have recently been identified but this area of contamination has not been
definitively linked to a specific source area. Unlike other areas of elevated arsenic contamination, there
are no data in that area for LNAPL, VOCs, SVOCs or ORP. The optimization review team believes a
reasonable explanation for arsenic in this area is migration from the source area in the vicinity of wells
EW-4A, EW-6 and EW-8.
                                         27

-------
 5.2.3        PLUME CAPTURE

The arsenic plume may be captured in the area of EW-7, but the optimization review team speculates that
other portions of the plume are likely not captured. Contamination from the 2009-2011 Arsenic
Investigation (Clean Harbor Environmental Services, Inc., 2011) identified arsenic between wells EW-7
and EW-9. Monitoring well BM-3 IB is one of the few monitoring wells in this area, and in 2007 and
2008, this well had some of the highest arsenic and pesticide concentrations detected in site monitoring
wells. It is unclear if these detections are indicative of a core area of plume migration or if the detections
of total arsenic and pesticides are a manifestation of the sampling procedure (for example, a turbid
sample). The well is indicated as damaged, and no distinct migration pathway between the principal
source area and this well has been delineated. No extraction wells are located in the area between EW-7
and EW-9. EW-4A may have been installed to intercept contamination along this migration pathway, but
insufficient data are available to evaluate the effectiveness of EW-4A to capture the plume in this area. In
addition, the plume is likely not captured in the vicinity of EW-9 due to the underperformance of EW-9
due to the actual flow rate being significantly lower than the expected flow rate from previous
groundwater modeling. The design extraction rate for EW-9 was 10 gpm; however, the well yields less
than 1 gpm on average. The width of the arsenic plume in the vicinity of EW-9 is also not well-defined.

 5.2.4        GROUNDWATER CONTAMINANT CONCENTRATIONS

VOC and SVOC concentrations  in  groundwater have  declined significantly and only a few locations
remain above applicable standards. Arsenic concentrations remain elevated significantly above applicable
standards over a much larger extent, particularly near the Cochato River in the vicinity of EW-7 where
naphthalene concentrations have decreased below standards.
5.3     SEDIMENT

Table 3 of the report "Operating Unit 3 Monitoring Results" (USAGE, September 1996) provides results
of samples from sediments remaining after the sediment excavation was performed. The Third Five-Year
Review discusses sampling results from the latest event in 2002. Sediment-related observations provided
by the optimization review team include the following:

    •  For arsenic, the samples for sediments left in place were all below the 1989 250 mg/kg cleanup
       goal. The maximum concentration of arsenic in sediment from the 1989 sampling was 154 mg/kg,
       and the maximum arsenic concentration from the latest sampling in 2002 was 110 mg/kg. The
       risk associated with potential exposure to these concentrations of arsenic, using updated toxicity
       values are within the acceptable risk range.

    •  For total PAHs, the samples for sediments left in place were mostly below the 1989 22 mg/kg
       cleanup level (seven of 46 were above 22 mg/kg, with three above 100 mg/kg. The maximum
       concentration from the most recent sampling in 2002 is 11  mg/kg.

    •  For pesticides, the samples of sediments left in place were  all below the 1989 cleanup goals.

The risks associated with the concentrations in sediment were evaluated as part of the Third Five-Year
Review using updated toxicity information. The risks are within the EP acceptable risk range. The 2004
Trend Evaluation Report (Metcalf & Eddy, Inc., 2004) presents trends in sediment concentrations from
1996 through 2002 collected from five stations as depicted in Figure 3 of the  same report (see Attachment
A). The optimization review team provides the following observations:

                                              28

-------
    •  The DDT and chlordane concentrations in sediments remained relatively stable over the sampling
       period.

    •  The PAH concentrations showed significantly more variation over the sampling period as
       compared to pesticides. Increases in PAH concentrations were noted in two stations in the 2000 to
       2001 time period, followed by decreases. One of the stations with a substantial increase was
       Station E, which is adjacent to the site.

    •  The arsenic concentrations were relatively consistent over the sampling period, with the largest
       variability found in Stations C and D which are located more than 3,000 ft downstream from the
       site. The arsenic concentrations in the stations near and upgradient of the site were generally close
       to the 6.1 mg/kg criteria established in the 2009 Five-Year Review. The samples downgradient of
       the site were generally higher than the 6.1 mg/kg criteria but within the acceptable range for
       excess risk of 1 x 10"4 to 1 x 10"6.

The number of samples collected relative to the area of interest, the frequency of data collection
(specifically, no samples since 2002), potential changes in sampling methodologies and fluctuating nature
of the results, make it difficult to determine the effect of the soil and groundwater remedy on contaminant
concentrations in sediment.
5.4    TREATMENT SYSTEM COMPONENT PERFORMANCE

5.4.1        EXTRACTION SYSTEM

The extraction system is in poor and deteriorating condition. The extraction rate in 2001 was
approximately 127 gpm but has decreased over time to a current extraction rate under 60 gpm, in part due
to underperforming or deteriorating extraction wells. The site team notes that the construction of the
monitoring wells includes dissimilar metals and the associated corrosion is causing the screen to separate
from the casing. EW-5 was recently shut down due to this type of problem. EW-9 never provided the
anticipated flow and typically operated at an average extraction rate of less than 1 gpm.

5.4.2        TREATMENT  SYSTEM

The treatment system is also in deteriorating condition and has several underperforming components.
Some of the components of the original design are no longer appropriate. The optimization review team
notes some of these issues:

    •  The site team reports that multiple tanks are showing signs of corrosion and some tanks have
       required patching to  replace leaks caused by corrosion.

    •  Solids removal is apparently problematic causing relatively frequent GAC change outs
       (approximately 4 per year) relative to the frequency expected due to chemical loading. Poor
       solids removal appears to be caused by undersized metals removal system clarifiers, inadequate
       oxidation, and or other aspects with the metals removal system and filtration system. The site
       team reports less frequent GAC change outs recently, but this is due to the lower extraction rate.
       The site team's experience with attempting to bypass the former activated sludge (biological
       clarifiers) and the ongoing need to remove solids from these units suggests carryover of solids
       from the metals removal  system clarifiers that are settling in the aeration basins, filtered by the

                                             29

-------
       pressure filters, and or passing through the pressure filters. Turbidity readings entering and
       leaving the pressure filters meet the design criteria, but the optimization review team has seen
       cases where turbidity readings were not adequate for evaluating solids removal.

    •   The system has a two-stage metals removal system. Each stage has a reaction tank and clarifier. A
       treatment plant with one appropriately designed and operated metals removal system should be
       adequate.

    •   The system relies on former activate sludge or biological clarifier units as air strippers and solids
       settling capacity. The units were originally intended to be used as bioreactors to treat influent
       with high organic contaminant concentrations. However, the organic contaminant concentrations
       have been lower than expected since system operation began, and the systems (which have
       concentric circular compartments for aeration and settling) have been used as inefficient air
       strippers and clarifiers.
5.5     REGULATORY COMPLIANCE

The system routinely meets discharge requirements.


5.6     COMPONENTS OR PROCESSES THAT ACCOUNT FOR MAJORITY OF ANNUAL
        COSTS

Table 5-1 provides a breakdown of the approximately $900,000 annual routine costs for the current
remedy in 2011 based on information provided by the site team. The total extraction rate during this time
period was generally under 70 gpm. GAC, permanganate and polymer usage, and waste generation,
reflect this relatively low extraction rate. The other categories are relatively insensitive to flow rate.
                                            30

-------
Table 5-1. Summary of Current Annual O&M Costs
Category
Project Management
Operations Labor
Materials
Waste Disposal
Utilities - Electric
Utilities - Gas
Groundwater sampling
Laboratory analytical
Other routine costs

Total
2011
Cost
$ 52,000
$ 573,000
$ 44,000
$ 11,000
$ 79,000
$ 15,000
$ 86,000
$21,000
$ 44,000

$ 889,000
Comments
These are contractor costs and includes monthly lump sum
$2,716 for plant operation as well as monitoring well sampling
and analytical results reporting
This includes operators as well as mechanic's time
GAC, polymer and permanganate. Includes the following:
• two GAC change outs at $8,080 per change out
• approximately 6,000 pounds of potassium
permanganate at $4 per pound*
• approximately 500 pounds of polymer at approximately
$10 per pound*
For approximately 30 tons of non-hazardous waste*
$0.1267 kilowatt-hour (kWh)
$1.082/therm (100,000 British thermal units)
Includes the annual sampling of wells which includes analytical
and yearly report
Operations and field samples includes quarterly samples (but
not annual sampling event)
Includes replacement parts and supplies

Approximate total for routine O&M costs in 2011
* Estimated by the optimization review team

In 2011 there were also non-routine costs of approximately $30,000 pertaining to the Five-Year Review
activities and arsenic studies.
5.7    APPROXIMATE ENVIRONMENTAL FOOTPRINTS ASSOCIATED WITH
       REMEDY
The following table presents the approximate environmental footprint on an annual basis for operation of
the existing P&T system operating at approximately 60 to 70 gpm. The footprint is calculated in general
accordance with the EPA''s Methodology for Understanding and Reducing a Project's Environmental
Footprint (EPA, February 2012).

-------
Table 5-2. Estimated Environmental Footprint for Annual P&T Operation
Core
Element
Materials
& Waste
Water
Energy
Air
Land&
Ecosystems
Metric
M&W-l
M&W-2
M&W-3
M&W-4
M&W-5
M&W-6
M&W-7

W-l
W-2
W-3
W-4
E-l
E-2
E-2A
E-2B
E-2C
A-l
A-2
A-3
A-4
A-5
Refined materials used on-site
Percent of refined materials from recycled or waste
material
Unrefined materials used onsite
Percent of unrefined materials from recycled or
waste material
Onsite hazardous waste generated
Onsite non-hazardous waste generated
Percent of total potential on-site waste that is
recycled or reused
Onsite water use (by source)
- Potable water: chemical blending, injected to
aquifer
- Groundwater: treatment, reinjected to aquifer
- Source: use, fate combination #3
- Source: use, fate combination #4
Total energy use
Total energy voluntarily derived from renewable
resources
- Onsite generation or use and biodiesel use
- Voluntary purchase of renewable electricity
- Voluntary purchase of Renewable Energy
Certificates (REC)
On-site NOx, SOx and PM10 emissions
On-site HAP emissions
Total NOx, SOx and PM10 emissions
Total HAP emissions
Total GHG emissions
Unit of
Measure
tons
percent
tons
percent
tons
tons
percent

millions of
gals
millions of
gals
millions of
gals
millions of
gals
MMBtu

MMBtu
MWh
MWh
Lbs
Lbs
Lbs
Lbs
tons CO2e
Metric
Value*
20
None
None
None
None
30
None

Limited
34
None
None
10,250

None
None
None
None
None
10,546
139
751
No significant effect on land and ecosystems.
 * Estimated metric value for one year of operation
NOx = nitrogen oxide
SOx = sulphur oxide
PM10 = Particulate Matter
HAP = hazardous air pollutants
GHG = greenhouse gas
gals = gallons
MMBtu = 1 million British Thermal Units
MWh = megawatt-hour
Ibs = pounds
CO2e = carbon dioxide equivalent

The primary contributor to the materials metric is the virgin GAC that is used for treatment. The primary
contributors to the energy use are the electricity use (more than 70 percent of the total energy use) and
natural gas use (more than 15 percent of the total energy use). These contributors are also among the
                                               32

-------
largest contributors to the air emissions footprints. The GAC contributes almost 20 percent of the GHG
emissions.

5.8     SAFETY RECORD

The site team did not report any safety concerns or incidents.
                                           33

-------
                           6.0   RECOMMENDATIONS
Several recommendations are provided in this section related to remedy effectiveness, cost control,
technical improvement and site closure strategy. Note that while the recommendations provide some
details to consider during implementation, the recommendations are not meant to replace other, more
comprehensive, planning documents such as work plans, sampling plans, and QAPPs.

Cost estimates provided herein have levels of certainty comparable to those done for Comprehensive
Environmental Response, Compensation, and Liability Act (CERCLA) FSs (-30%/+50%), and these cost
estimates have been prepared in a manner generally consistent with EPA 540-R-00-002, A Guide to
Developing and Documenting Cost Estimates During the Feasibility Study, July, 2000. The costs
presented do not include potential costs associated with community or public relations activities that may
be conducted prior to field activities. The cost impacts of these recommendations are summarized in
Tables 6-1 and 6-2.

Figure 6-1 presents a flowchart that summarizes potential remediation scenarios (identified as "A"
through "D" on Figure 6-1), and some of the decisions that will determine which scenario ultimately
occurs. Figure 6-1 is referenced in the discussion of some of the recommendations provided below.
                              {This Space Intentionally Left Blank}
                                              34

-------
Figure 6-1.    Flowchart Summarizing Potential Remediation Scenarios
           REF NE CONCEPTUAL MODEL:
           •  Resume f-sht'ssue samp!"ngand carty/documentf shtissuecr'ter'a
           *  Sample the Cochato R'ver sed'ments us'ngthe "ncrementa 5amp:"ng method
           •  Conduct spec'at'on analysis for arsenic :n 5e:'ectmon'tor"ng>//e is
           •  Add ~PH and~OCto  aboratoryanayxsiorroutine groundivater monitoring
           •  Perform :€ach'ngtests on s te so: stobetter understand'fash s a cont'nu';ng source of arsenic
           •  Record snd report ORP resit tsvvfthgroundvvater monitor ng data
                                              Will focus mewing
                                                       be on
                                                        source
                                                  remediation?
            Add new EW's (rep ace EW-9 and
            EW-7, pi us one or more EW's
            between  those v/e s

             nstai a new treatment       for
             ong-term operator)
     ₯es
               Source
               approach (fSCO)
                                                   Source

                                                  feasible?
       characterization of LNAPL
a nd              of f u i l-sca     rce
  remediation     on LNAPL extent
B
C
D
mp srnent fu i-sca e source
remed at-'oni SCO) w thoutany
operst'onof P&.~

mp ement fu 1 -sea -e source
ramed'at'on j SCO) \'i th operat'on
of ex'st ngtreatment system w th
some mod'* cat on

Implement full-scale source
remediation (iSCO} with operation
of a
    Notes:
J EW-7

/
•— — ^
EW-7 plus one or more
other EWs



EW-7 p: us one or more
other new EWs
       I,'  For oil scenarios (A to D) periodic sediment ar.d fish tissue sampling in the future is recommences.
       2}  For scenarios B ar.dC, o decision regarding the need for subsequent actions (e.g., P&Twith upgraded
          treatment plant end/or additional source area remediation} woiild be deferred until after results of the
          source area remediation are known, which provides a realistic opportunity to avoid incurring the up-front
          costs fortreatment plant upgrades,
       3)  A decision to pursue scenario B rather than scenario C or D could be based on results of current baseline
          sampling for sediments compared to previous results (ses text),
       4)  For scenarios C anoD, a decision to extractfrom EW-7 only versus adding new EWs could be based on
          results of current bcse'ine sampling for sediments compared to previous results (see text).
                                                    35

-------
6.1     RECOMMENDATIONS TO IMPROVE EFFECTIVENESS

6.1.1        RESUME FISH SAMPLING

As indicated on the flowchart presented on Figure 6-1 (see Appendix A), the optimization review team
recommends that fish tissue sampling be performed under existing conditions, and then periodically at the
frequency recommended in the Third Five-Year Review (every five years) to monitor future
concentrations. Also, the optimization team recommends that data quality objectives for analyzing fish
tissue moving forward be clearly documented. At the request of site stakeholders, the optimization
provides specific recommendations below for collecting fish tissue samples, and suggests that the site
team use this as a starting point to finalize a sampling approach with respect to fish tissue that will be
acceptable to all site stakeholders for evaluating protectiveness.

The optimization review team does not recommend sampling different stations (upstream, adjacent and
downstream). Rather, the optimization review team recommends that fish sampling be performed in the
location closest to the site (adjacent to or downstream from the site) where fishing might reasonably occur
by the general public for purposes of consumption. It is recommended that the sampling focus on the
following fish:

      •   Abundant fish (for example, sunfish species such as bluegill and or pumpkinseed) - these are
         expected to be relatively abundant, and therefore are good species to target for long-term trends

      •   Predatory fish (for example, largemouth bass and or brown bullhead) - these represent large
         fish that are desirable for consumption. The largemouth bass may be more plentiful.

Although American eel  has been collected in previous studies, they are migratory (less desirable) and also
more difficult to collect and handle and may not be present in sufficient numbers to collect a
representative sample as individual replicate samples. It is recommended that three individual fish from
one of the selected sunfish species, and three individual fish from one of the selected predatory species,
be collected per event. For abundant fish, filets can be sampled for fish longer than 6 inches, and whole-
body analysis can be performed for fish less than 6 inches. For predatory fish, all fish collected for
sampling should be larger than 6  inches.

The preliminary costs for preparing an updated sampling plan for fish tissue sampling is estimated to be
$9,000. The estimated cost to conduct the fish tissue sampling is estimated to be approximately $25,000.
The costs for clarifying  and documenting the criteria have not been estimated.

6.1.2       SAMPLE THE COCHATO RIVER SEDIMENTS USING THE INCREMENTAL SAMPLING
            METHODOLOGY

Sediment sampling provides two benefits for the remedy. First, it helps track the quality of the river over
time subsequent to remedial activities to date. Second, it helps evaluate the  effectiveness of continuing
remedial activities in protecting river sediments from further contamination. The sampling data to date are
subject to significant variability that makes data interpretation difficult.  Sampling has previously been
conducted at five stations. Four stations (A through D) were divided into nine intervals, and three
intervals at each station were selected at random to be sampled in each event. Stations  A, B and D are
approximately 450-foot stretches of river (9 intervals of 50 ft each), and Station C is a  900-foot stretch of
river (9 intervals of 100 ft each).  Only one sample was collected from Station E. The samples from the
three intervals per station (except Station E) were therefore used to represent sediment concentrations for

                                             36

-------
each 450-foot or 900-foot station. The ranges of the sampling results for a given year were sometimes
higher than the year to year variability, making it difficult to evaluate changes in river condition over
time. One potential way of collecting more representative samples from each interval is to use the
incremental sampling methodology (ISM) as described in the Interstate Technology Regulatory Council
(ITRC) web-based ISM document (www.itrcweb.org/Team/Public?teamID= 11). ISM has the benefit of
submitting fewer samples for laboratory analysis and providing more representative results for each
station.

Because sediment sampling is suggested to be performed to evaluate conditions over time, rather than to
delineate specific target areas for remediation, the optimization review team recommends considering the
use of ISM for sediment sampling for future samplings at each of the five stations. The optimization
review team recognizes that there has not been widespread use of ISM for sediments to date, but given the
intended use of the data, the use of ISM for sediment sampling at this site seems appropriate. The specific
details of an ISM work plan are too detailed to provide in this report, but a general description with site-
specific context is provided.

Using the ISM terminology, the site team could consider each existing station both a "decision unit (DU)"
and a "sampling unit (SU)". Each DU/SU (station) would be sampled over time and used to determine if
sediment concentrations are generally increasing or decreasing over time in that DU/SU.  Each DU/SU
would be divided into a sub-network  of perhaps 45 equally-sized grid areas. Sediments are collected as
sample increments from each of the 45 grid areas in a single DU/SU and combined into a single
"incremental sample" for laboratory analysis. The result for each sampling station is a single laboratory
sample that averages the contaminant concentrations from 45 locations, rather than the previous approach
where three discrete laboratory samples are analyzed and then averaged. Although additional
"incremental samples" could be collected for each station, the optimization  review team does not believe
that additional benefit from these  samples merits the additional cost given the intended use of the data.
The applicability of using an ISM approach over a more traditional grid or transect approach can be
assessed, if desired, by also collecting a limited number of discrete samples.

Repeated ISM sampling on an annual basis will provide increased confidence in the results with each
event that is conducted and hopefully provide a meaningful data set for evaluating trends over time. The
optimization review team estimates that up to $15,000 will be required for developing an ISM sampling
plan. The optimization review team also estimates that the sampling could be conducted within five days
per event with a two-person crew. Six samples (including one QA/QC sample) would be  submitted to a
laboratory for analysis for SVOCs, pesticides and arsenic. Results can be reported in the annual report.
The estimated cost for each annual event, including sampling, laboratory analysis, data management and
reporting should be approximately $15,000.

6.1.3       CONDUCT SPECIATION ANALYSIS FOR ARSENIC IN SELECT MONITORING WELLS

Arsenic can be present in the subsurface as arsenate (oxidized and potential to be immobilized), arsenite
(reduced and mobile), and organic (methylated) arsenic (mobile). Eliminating the organic contamination
(for example, VOCs, SVOCs and TPH) and increasing the ORP can convert the arsenite to arsenate and
allow the arsenate to adsorb to the soil matrix; however, this change in ORP will not address organic
arsenic.  The relationship between ORP and arsenic is fairly well established for the areas near EW-7 and
EW-8; however, insufficient data are  available for evaluating the ORP/arsenic relationship in the area of
ASB-9 and ASB-16. The optimization review team recommends conducting one round of arsenic
speciation analysis (including methylated arsenic) on wells MW-97-12, MW-97-28 and MW-04-02. In
addition, during the next mobilization of a direct-push rig to the site, one or more groundwater samples
from the vicinity of ASB-9 and ASB-16 should be analyzed for VOCs, SVOCs, TPH, ORP and speciated


                                              37

-------
arsenic samples. The additional cost of this recommendation, if coordinated with other direct-push
sampling, should be under $5,000.

6.1.4       ADD TOTAL PETROLEUM HYDROCARBONS AND TOTAL ORGANIC CARBON TO
            LABORATORY ANALYSES FOR ROUTINE GROUND WATER MONITORING

The CSM discussed in Section 4.0 incorporates speculation by the optimization review team that ongoing
arsenic contamination and continued arsenic mobility in groundwater could be linked to low ORP that
might be caused by microbial degradation of organic contaminants. The VOCs and SVOCs are only a part
of the organic compounds contributing to the low ORP. TPHs are also a potential source. To better
evaluate a potential correlation between residual organic contamination versus low ORP (see
recommendation in Section 6.3.1) and high arsenic concentrations, the optimization review team
recommends adding TPH and total organic carbon (TOC) to the analyte list for the groundwater
monitoring program. Assuming 30 wells monitoring wells are sampled on an annual basis, including
these additional analytes in the monitoring program would add  an additional $3,000 per year in laboratory
costs.

6.1.5       PERFORM LEACHING TESTS ON SITE SOILS TO BETTER UNDERSTAND IF SITE
            SOILS ARE A CONTINUING SOURCE OF ARSENIC

To further address the speculation by the optimization review team that ongoing arsenic contamination
could be linked to low ORP that might be caused by microbial degradation of organic contaminants, it is
recommended that some controlled tests be designed and performed to assess the leaching of arsenic from
the site soils (saturated soils and incinerated soil/ash) under varying conditions of ORP. It is suggested
that tests be performed using site soils from several key locations where high arsenic concentrations have
been identified and source material might be suspected, and that different tests be performed using site
water versus "lab water". The "lab water" would represent variants of TCLP tests with water adjusted for
both ORP and pH. The use of site water has the advantage of representing actual site water chemistry.
However, since the site water is already in contact with the soil and already has elevated arsenic
concentrations, interpretation of results from site water may be  complicated. Designing the specific
details of such a test is beyond the scope of this optimization review, but the optimization review team
estimates the cost to design and implement such tests to be on the order of $25,000.
6.2     RECOMMENDATIONS TO REDUCE COSTS

6.2.1       REDUCE TREATMENT PLANT REPORTING

Daily, weekly, monthly, quarterly and annual reports are prepared. The daily reports and weekly reports
provide limited benefit to managing the site but require additional labor. The optimization review team,
therefore, suggests eliminating the daily and weekly reports and maintaining the same level of
information in the monthly reports. This recommendation along with other labor reducing
recommendations may result in a meaningful reduction in operator and or reporting labor (such as,
reduction in treatment plant staffing), but specific cost savings due to this specific recommendation have
not been quantified.
                                             38

-------
6.2.2       OPTIMIZE METALS REMOVAL SYSTEM

If the existing treatment plant is expected to operate for more than five years, the optimization review
team suggests replacing it with a new treatment system to streamline operations. However, if the existing
treatment plant is going to operate for five years or less, the optimization review team recommends
considering optimizing the existing metals removal system as described below. Modifications to chemical
use and clarification may also be appropriate as discussed below.

Potassium permanganate has proven to be effective at oxidizing the arsenic at the head of the treatment
plant. However, potassium permanganate requires manual chemical blending and daily maintenance of
the system. Hydrogen peroxide is also an effective oxidant for arsenic removal and is used, for example,
at the Vineland Chemical Superfund Site in New Jersey for an arsenic removal system. Hydrogen
peroxide can be transported to the site as a 50 percent aqueous solution and added to the process stream
with a feed pump. No manual batching would be required, and maintenance would be negligible.

The Vineland Chemical Superfund Site is also able to remove arsenic with a significantly lower ORP (for
example, approximately 350 mV) than the target ORP at Baird and McGuire of approximately 700 mV.
The set point of 700 mV is comparable to the set point used for treating pathogens and may be higher than
necessary for arsenic oxidation. Although historic tests may have been performed to determine the
optimal ORP set point for the site, the water quality has changed significantly over time, and the required
ORP may now be  lower. The ORP/Eh vs. pH plots shown in Figures B-5 through B-8, indicate that an Eh
(typical ORP measurement + 200 mV to correct for the offset associated with the reference electrode) of
150 mV should be adequate at a pH between 6.5 and 7 to co-precipitate arsenic with iron. A  higher ORP
is likely needed to provide the response time needed in a treatment plant. Typically, the optimization
review team sees a higher ORP setting of approximately 350 mV, which is higher than 150 mV but
significantly lower than the currently used 700 mV. The optimization review team recommends revisiting
the ORP set point to see if adequate arsenic removal at this site can be accomplished with a lower ORP. A
lower ORP set point would translate to lower chemical usage regardless of the oxidant used.

The site team could test hydrogen peroxide as a potential oxidant (as is done at the Groveland Wells Site
in Region 1) and determine if using hydrogen peroxide would be more cost-effective than potassium
permanganate. Part of the cost savings associated with using hydrogen peroxide would be from reduced
labor if the labor reductions associated with a switch to hydrogen peroxide can be combined  with other
labor reducing recommendations to eliminate an operator or mechanic position. Testing lower ORP set
points and testing  hydrogen peroxide could be done on a trial basis with the treatment plant.  The
optimization review team estimates that $10,000 would be sufficient for planning the test, implementing
the test, and conducting the additional arsenic analyses to support the test.

Iron and arsenic removal with  iron co-precipitation is sensitive to the pH because the charge  on the iron
hydroxide floe changes with pH. Arsenic in the oxidized state (for example, arsenate, H2AsO4") has a
negative charge. The iron floe, therefore, should have a positive charge to attract the negative arsenate
ion, and anionic polymer (negative charge) should be used for coagulation of the positive iron/arsenic
floe. An optimal pH set point for this overall chemistry is likely 6.5. The pH of the influent to the
treatment plant ranges from approximately 6.7 to 7 with no pH  adjustment.  Decreasing the pH to 6.5 may
improve flocculation, coagulation and settling. The polymer used and or the polymer dosing  might also be
modified based on the pH, ORP set point and oxidant used.  The site team might consider working with a
polymer vendor to conduct bench scale studies to identify the optimal pH, ORP, oxidant and polymer to
improve settling within the metals removal system clarifiers. Testing within the plant can also be
conducted and might be accomplished for under $10,000.
                                              39

-------
The metals removal system clarification step might also be improved by increasing the capacity of the
clarification step. Little benefit is achieved from the second stage of the metals removals system. To
improve settling, the site team might consider replumbing the plant to arrange the two metals removal
clarifiers in parallel. This would decrease the flow rate in each clarifier and should improve settling. To
evaluate the potential effectiveness of this change, the site team should compare turbidity after the first
stage metals removal from periods when the flow rate was over 100 gpm, to the turbidity after the first
stage metals removal from periods when the flow rate was approximately 60 gpm. If there is a noticeable
difference in the two turbidity measurements, then arranging the two clarifiers in parallel should improve
settling and reduce the solids loading on the pressure filters. Arranging flow through the metals removal
clarifiers in parallel would likely cost under $10,000.

Savings from implementing the above recommendations is difficult to quantify. Savings might be realized
in reduced labor, chemical usage and GAC usage that could potentially result in cost savings of $10,000
per year or more.

6.2.3        DISCONTINUE AERATION IN ACTIVATED SLUDGE UNITS

The activated sludge units that are currently used as air strippers are providing little benefit to overall
water treatment, and the aeration is likely contributing to biofouling of the GAC units. Although the
aeration removes some mass,  the GAC units are changed out prematurely due to fouling rather than due to
chemical loading.  Therefore, the mass removal from aeration is not translating to a reduction in GAC use.
The optimization review team recognizes that the clarifier compartments of these activated sludge units
are critical to current treatment plant operation given the underperformance of the existing metals removal
clarifiers. The optimization review team recommends discontinuing operation of the aeration blowers and
using the units for solids settling only. Discontinuing blower operation would reduce electrical costs by
approximately $9,000 per year and may reduce the biofouling of the GAC, which could potentially
decrease the number of GAC  changeouts.

6.2.4        POTENTIAL  LONG-TERM COST SAVINGS FROM REMEDIATION SCENARIOS

Figure 6-1 presents a flowchart that summarizes potential  remediation scenarios for this site (identified as
"A" through "D" on Figure 6-1).  The long-term costs for this site, and potential cost-savings versus the
status quo, will be highly dependent on which scenario ultimately occurs. That will depend on several key
decisions and outcomes moving forward, including the following:

   •   Will the primary focus moving forward be on source  area remediation (scenarios "B", "C" or
       "D"), or will the focus be on containment of impacted groundwater prior to discharge to the
       Cochato River (scenario "A")?

   •   If the focus is on additional source area remediation, will it be successful enough to eliminate
       P&T in the long-term, and will that success be fast enough to eliminate the need for a new
       treatment plant in the short-term (scenarios "B" or "C") or will a new treatment plant be required
       anyway (scenario "D")?

   •   If the focus is on additional source area remediation, will the results of the sediment sampling
       (current baseline and  comparison to previous results) indicate that containment of impacted
       groundwater near the  Cochato River is not required during source area remediation so that P&T
       can be eliminated during the source area remediation (scenario "B"), or perhaps containment will
       only needed in the vicinity of EW-7 (options for scenarios "C" and "D")?
                                              40

-------
    •   If the focus is on additional source area remediation, how much up-front-cost will ultimately be
       required for successful implementation of aggressive source area remediation based on the extent
       of LNAPL that is not yet fully characterized?

These items are discussed in detail in Section 6.4, along with initial cost estimates for some of the
scenarios. The approach that likely has the greatest potential to reduce life-cycle costs is to pursue more
aggressive source area remediation, because the goal of such efforts would be to ultimately eliminate the
need for long-term containment, which currently  costs on the order of $900,000 per year for an indefinite
period. A modified P&T system in the future potentially might cost on the order of $500,000 per year.
The payoff period would depend on the ultimate up-front cost of the active remediation, whether or not it
is successful at eliminating the need for long-term P&T, and the avoided costs per year for long-term
P&T after it is decommissioned. Note that an ultimate decision regarding a path forward (such as, the
most appropriate remediation scenario) will depend on evaluation of future data collection and testing that
is recommended in this optimization review report.
6.3     RECOMMENDATIONS FOR TECHNICAL IMPROVEMENT

6.3.1       RECORD AND REPORT ORP RESULTS WITH GROUNDWATER MONITORING DATA

The CSM discussed in Section 4.0 incorporates speculation by the optimization review team that ongoing
arsenic contamination could be linked to low ORP that might be caused by microbial degradation of
organic contaminants. The optimization review team recommends reporting the ORP results in the
monitoring reports and correlating the ORP measurements with the arsenic concentrations as well as TPH
and TOC (see Section 6.1.4). Implementing this recommendation should not require any significant
additional cost.


6.4     CONSIDERATIONS FOR GAINING SITE CLOSE OUT

The discussion of considerations for gaining site closeout in the following sections references Figure 6-1,
which presents a flowchart that summarizes potential remediation scenarios for this site (identified as "A"
through "D" on Figure 6-1).

6.4.1       DETERMINE IF PRIMARY Focus WILL BE SOURCE REMEDIATION OR
            CONTAINMENT

A significant decision moving forward is if the primary focus will be on source area remediation, or if the
primary focus will be on containment of impacted groundwater prior to discharge to the Cochato River.
Four potential "scenarios" moving forward are illustrated on Figure 6-1 and in Table 6-2. Scenario "A"
focuses on containment, whereas Scenarios B to D focus on source area remediation. The optimization
review team believes additional information and testing will be required to determine the primary future
focus of the remediation, and initial steps are suggested in Sections 6.1.1 to 6.1.4 of this optimization
review report to develop the information required to make that decision. O&M of the current system
should continue as the suggested data are acquired and evaluated by MassDEP and EPA Region 1.
Depending on the outcome, MassDEP and EPA Region 1 will also need to determine the need (if any) for
updates to decision documents and or programmatic classification of the remedy.
                                             41

-------
Detailed discussion of four potential "scenarios" illustrated on Figure 6-1 is provided below.

    •   Scenario "A " - Future Focus on Containment. If the future focus of remediation will be on
       containment (scenario "A"), significant up-front modifications to the current P&T system will be
       required, due to the expectation of long-term P&T operation for a containment-focused remedy.
       As an aside, the optimization review team believes a long-term in situ barrier using air sparging,
       as an alternative to P&T, would likely suffer from excessive fouling due to the continuous
       loading of dissolved iron into the sparge area. Modifications would be made to the extraction
       system to improve containment, and modifications to the treatment plant would be made to
       improve performance and streamline operation. LNAPL would be  collected from the subsurface
       to the extent feasible.

           o   Extraction system modifications would include installation of new extraction wells (for
               example, replace EW-9 and add one or more extraction well between EW-7 and EW-9),
               addition of piping and controls for the new extraction well locations, and substantial
               upgrades to the current treatment plant. Installation of the extraction wells, piping the
               wells to the treatment plant, conducting pumping tests and conducting a capture zone
               evaluation to determine appropriate extraction rates, which will include development of a
               "target  capture zone" and will likely incorporate groundwater modeling, will likely cost
               on the order of $250,000.

           o   Modifications to the treatment system would involve removing all of the existing
               equipment, installing new equipment and commissioning the new equipment. These
               substantial changes are suggested because the current system requires a substantial
               amount of labor due to the deteriorating condition of the existing equipment and because
               a large  number of treatment components in the process stream do not provide a beneficial
               function (for example, second stage of metals removal) or are inefficient (for example,
               use of activated sludge units for aeration and settling). The current system requires
               approximately 200 hours of staffing per week, whereas a new system should require only
               40 to 80 hours of staffing per week. The optimization review team estimates that the
               suggested changes would require as much as $200,000 to remove the existing equipment,
               approximately $ 1 million to furnish and install new equipment and approximately
               $300,000 to commission  the system for a total of $1.5 million. A lower cost option may
               be available if the metals removal and solids handling equipment with appropriate
               specifications from another site's treatment plant are  available for use at the Baird and
               McGuire site. For example, the metals removal and solids  handling equipment at the
               Groveland Wells treatment plant was designed to handle approximately 150 gpm and
               would likely be appropriate for the Baird and McGuire, site if available. The costs for
               moving equipment, installing the equipment and commissioning the new plant would
               likely be under $1 million.

       This scenario (focus on containment) will make it highly probable  that there will be long-term
       O&M costs on the order of $500,000 per year or more for an  indefinite period (such as, many
       decades), since  the sources of organics that cause the reducing conditions (and resulting high
       dissolved arsenic concentrations in groundwater) will not be addressed and long-term
       containment will likely be required  due to the "additive nature" of long-term arsenic discharge to
       sediments of the Cochato River under this scenario. However, the significant up-front costs
       associated with aggressive source area remediation will be avoided under this scenario.

    •   Scenarios "B"  to "D" - Future Focus on Source Area Remediation If the future focus is on
       source area remediation (scenarios "B", "C" or "D"), more significant up-front costs will be

                                               42

-------
       required to implement additional active source remediation such as ISCO (a summary of potential
       technologies is described below). However, the goal of such efforts would be to ultimately
       eliminate the need for long-term P&T, which currently costs on the order of $900,000 per year. A
       modified P&T system in the future potentially might cost on the order of $500,000 per year. As
       indicated on Figure 6-1, it is also possible that short-term addition of new extraction wells and
       extensive treatment plant upgrades (for example, a new treatment plant) could be avoided with
       this approach,  and require only minor short-term modifications  (on the order of $100,000) to the
       existing treatment system (see Section 6.4.2). The payoff period for the source area remediation
       would depend on the ultimate up-front cost of the source area remediation, whether or not it is
       successful at eliminating the need for long-term P&T, and the avoided costs per year for long-
       term P&T that are ultimately eliminated.

The optimization review team suggests the following three primary technology options for source area
remediation:

    •   Air sparging and soil vapor extraction (AS/SVE)
    •   In situ chemical oxidation (ISCO)
    •   In situ thermal remediation (ISTT)

The primary objective  of these technologies would be to address the organic contamination (including
residual LNAPL) that is speculated by the optimization review team to be causing exceedances of some
VOC and SVOC compounds and causing the low ORP that is either mobilizing the arsenic or allowing it
to remain mobile. Pesticide contamination may not be directly addressed but in the absence of residual
LNAPL the remaining pesticides are expected to adsorb to soils and not be detected above  GW-1
Standards in groundwater samples. Each of the technologies is  discussed below assuming a target
remediation area of 150,000 square ft, corresponding to a remediation volume of approximately 60,000
cubic yards if a 10-foot thickness of impacts is assumed. The conceptual remediation area of 150,000
square ft generally corresponds to the approximate area of the LNAPL extent indicated on Figure B-4 in
Attachment B and assumes that the contamination between  EW-7 and EW-9 would attenuate once the
upgradient source is removed. This is a key assumption that would need to be evaluated after additional
characterization has been conducted (See Section 6.1.5 and  Section 6.4.2) because conducting source area
remediation in this area would significantly increase  the costs provided  in this section. The conceptual
target volume for remediation would be refined with additional characterization prior to remediation,
potentially resulting in increases or decreases to the target volume. The  potential technologies are
summarized below.

    •   AS/SVE - This approach would involve injecting air into the saturated zone with the intent of
       volatilizing  some of the VOCs, SVOCs and TPH and adding oxygen to the subsurface to enhance
       microbial degradation of organic contamination. The technology would also include SVE wells to
       remove off-gas from the sparging and to address residual contamination above the  water table.
       For conceptual purposes the radius of influence for  sparging wells (for volatilization and oxygen
       delivery) is assumed to be approximately 10ft, and the  radius of influence for SVE wells is
       assumed to be approximately 20 ft. Also for  conceptual purposes, the average depth for sparge
       wells is assumed to be 30 ft and the average depth for SVE wells is assumed to be  15 ft. Based on
       these assumptions, approximately 2,000 sparge wells and 500 SVE wells would be required.
       Assuming the system is operated on a pulsed/rotating basis to reduce the compressor and blower
       capacity, construction costs would be close to $10 million and operating costs would be
       approximately $600,000 per year. Assuming the system requires approximately 4 years of
       operation, the total cost for this system would be on the order of $12.4 million. The following are
       advantages and disadvantages of using this technology approach:


                                              43

-------
                            AS/SVE Advantages and Disadvantages
Advantages
• Directly addresses issue of low ORP by
removing organics and adding oxygen to
source area
• Operating costs decrease if portions of the
system can be shut down
• Whole system or part of system can continue
to operate for additional years with relatively
low overall cost
• Addresses vadose zone contamination
Disadvantages
• Relatively high capital costs
• Does not directly remove or destroy
pesticides
• Potential for fouling from biological
activity or iron precipitation
• Does not address organic arsenic, if
present
• Results in large amount of
infrastructure in ground
Key Unknowns
• Actual extent of treatment zone
• Actual system performance
• Duration of operation
• Presence or absence of organic arsenic
• Degree of fouling and effect of fouling on remedy performance
•  ISCO - This approach would involve injecting chemical oxidants into the saturated zone with the
   intent of directly destroying VOCs, SVOCs, TPH, and some pesticides. Due to the required
   oxidant strength for this site, Fenton's reagent or activated persulfate would be appropriate
   oxidants. For conceptual purposes the radius of influence for the injection wells is assumed to be
   approximately 15 ft. The treatment volume assumed for the AS/SVE remedy is used and would
   translate to approximately 850 injection locations. Given this large number of injection locations,
   the preference to inject at multiple intervals to improve reagent distribution, and the need to
   conduct multiple injection events, it may be preferable to purchase two direct-push rigs,
   supporting injection equipment, and full-time operators rather than install permanent injection
   points or contract the injection from a chemical injection vendor. The direct-push rigs and
   supporting equipment would likely cost approximately $500,000. Two full-time injection crews
   of two individuals each would cost approximately $600,000 per year. An additional $100,000 per
   year could be allocated for performance sampling with the same  crews, and $150,000 per year
   could be allocated for project management, engineering support and reporting. The two crews
   should be able to conduct injections at 10 locations per day allowing for more than two injection
   events per year. The cost for reagents for a full-scale application would be approximately
   $1,500,000 per event. Assuming four full-scale events can be conducted in two years, the total
   cost of the ISCO remedy would be approximately $8.2 million. If recoverable LNAPL is
   identified in any of the direct-push points, the crews could install temporary piezometers to
   recover the LNAPL prior to injection.
                                          44

-------
                                 ISCO Advantages and Disadvantages
Advantages
• Remedy is applied in a relatively short time frame
• Directly address issue of low ORP by destroying
organics and adding oxidants to source area
• Low capital cost
• Injection costs decrease as injection points are
eliminated
• Strong oxidants should address some pesticides
• Strong oxidants will convert organic arsenic into
arsenate
• Leaves little or no infrastructure in place
Disadvantages
• Large quantities of costly
reagents are required
• Requires purchase and
maintenance of direct-push rigs
and injection hardware
• May be difficult to address
contamination present in vadose
zone
Key Unknowns
• Actual extent of treatment zone
• Oxidant demand
• Number of injection events required
       ISTT'- This approach would involve heating the subsurface to volatilize and potentially destroy
       organic contaminants, and then extracting the volatilized contaminants. Steam-enhanced
       extraction or thermal conduction would likely be used for this setting and contaminant types.
       Assuming the same treatment volume as the AS/SVE and ISCO options, the cost for thermal
       remediation would likely be approximately $15 million. For reference, the conceptual treatment
       volume discussed here is approximately three times larger than the treatment volume that was
       thermally treated at the Groveland Wells  site, which cost approximately $6 million for ISTT. Two
       factors that could increase the cost at this site compared to the Groveland Wells site are target
       temperature and the distribution of the treatment volume. The Baird and McGuire remedy would
       require higher heating temperatures due to the contaminant types and the treatment volume being
       spread over a much larger area. Although some cost efficiencies would be recognized with a
       larger project, these two items would tend to increase the unit cost for treatment.

                                 ISTT Advantages and Disadvantages
Advantages
• Remedy is applied in a relatively short time frame
• High heating temps should address pesticides
• Heating helps address residual contamination
locked in relatively impermeable zones
• Residual heat after active heating assists with
microbial degradation
Disadvantages
• High capital costs
• A different technology may be
needed if additional polishing is
needed
• Existing PVC monitoring wells in
the heating area would be
destroyed during heating
Key Unknowns
• Actual extent of treatment zone
• Actual cost of remedy
• Site conditions following heating application
Based on the above preliminary conceptual analysis, the optimization review team believes that the ISCO
option appears to be most appropriate of the source remediation approaches due to the relatively low up-
front costs (relative to the other technologies) and the ability to adjust the level of effort and costs based
on remedy performance. The results from source area characterization and pilot testing, as discussed
below, may result in changes to the above preliminary analysis.
                                             45

-------
6.4.2       PILOT TESTING AND LNAPL CHARACTERIZATION IN CONJUNCTION WITH MORE
            AGGRESSIVE SOURCE REMEDIATION

Pilot testing and additional characterization are highly recommended before proceeding with a full-scale
remedy. If the site team decides to address the source area, then the optimization review team
recommends high-resolution site characterization (HRSC) of the source area and ISCO pilot testing.
Given the presence of LNAPL with PAHs, laser-induced fluorescence (LIF) would be an appropriate tool
for real-time measurements applied using a HRSC strategy. However, if much of the organic mass is in
alkanes (straight chains) rather than aromatics (hydrocarbon rings like naphthalene), then LIF may not be
appropriate. The optimization review team recommends selecting a target area at the upgradient edge of
the known historic LNAPL extent to demonstrate the applicability of LIF. The demonstration would
involve using LIF with a cone-penetrometer (CPT) to collect real-time fluorescence (for example, from
PAH) and lithology data. It would also involve use of a direct-push rig to collect soil grab samples for
SVOCs and TPH. The two target areas could be each be 50-ft by 50-ft. The LIF/CPT testing could likely
log more than 250 ft per day, providing continuous vertical  information to 40 ft at 6 or more locations. A
direct-push  rig could likely grab 5 to 10 discrete soil samples during a day. The demonstration area could
be thoroughly investigated in two days. The discrete samples would be qualitatively compared to the
LIF/CPT results to determine if the LIF/CPT provides a reasonable signal given the contamination
observed from the soil samples. The cost for the demonstration would likely be approximately $60,000,
including a  work plan, field work, analysis and reporting.

ISCO can then be pilot-tested in the characterized demonstration area. Pilot testing is not recommended in
the downgradient areas because recontamination of the downgradient areas is likely if upgradient sources
are still present. Pilot testing should be conducted using a direct-push rig to inject Fenton's reagent into
the impacted intervals delineated during the characterization. Up to five events should be conducted with
performance sampling conducted in between each event. The objectives of the pilot would be to evaluate
the amount  of reagent used, the radius of influence of the injections, resulting reductions in all types of
organic contamination (including pesticides),  and immobilization of arsenic.  Based on the results, the site
team can revisit the cost analysis to see if the remedy would be practical at full scale, recognizing that the
pilot test plot may require significantly more oxidant than other portions of the plume. The optimization
review team estimates that the cost for the  pilot testing, including work plans, four rounds of injections,
four rounds of direct-push sampling to evaluate performance and reporting would be under $300,000.

If the pilot test is successful in  removing organic contamination, increasing the ORP, and immobilizing
arsenic, then the site team could move forward with full-scale source characterization of LNAPL,
including the area between EW-7 and EW-9 where high arsenic has been identified but limited
information is available about organic contamination. The approach to characterization will be dependent
on the outcome of the LIF/CPT demonstration. If LIF/CPT  can be used with  limited collaborative data
from direct-push sampling, then full-scale  characterization might be cost approximately $400,000,
including a  dynamic work plan, approximately 30 days of field work with a LIF/CPT rig and a separate
direct-push  rig, supporting analytical work and reporting.

6.4.3       CONSIDERATIONS FOR IMPROVING MIGRATION CONTROL IN CONJUNCTION WITH
            MORE AGGRESSIVE SOURCE REMEDIATION

As indicated on Figure 6-1, if more aggressive source area remediation is pursued there are several
potential approaches regarding groundwater migration control during that several-year period, as follows:
                                              46

-------
    •  No P&T during aggressive source area remediation (scenario "B")

    •  P&T to provide containment during aggressive source area remediation (scenarios "C" and "D")

           o  Using the existing treatment plant with some minor modifications (scenario "C)

           o  Using a newly-installed treatment plant (scenario "D")

If P&T can be avoided during the source area remediation (scenario "B"), there would be savings for
O&M of the P&T system (currently on the order of $900,000 per year) as well as savings for any short-
term modifications to the extraction and treatment system. These savings could be applied towards the
cost of the aggressive remediation. The optimization review team notes that there has likely been
incomplete containment for many years of previous system operation (for example, near EW-9 and
between EW-7 and EW-9), so the only major difference from those conditions if P&T was eliminated
would be near EW-7. If the suggested sediment sampling (See Section 6.1.2) indicates there are similar
sediment concentrations adjacent to EW-7 and further downstream (particularly for arsenic), and that the
sediment concentrations are not much higher than previous sampling events from 2002 and earlier, it
would suggest that discharges to groundwater for a few years during aggressive source remediation will
likely not cause significant degradation of the Cochato River, and site stakeholders may find it acceptable
to eliminate P&T while the aggressive source remediation proceeds.

If scenario "B" (no P&T during aggressive source remediation) is not acceptable, the next least costly
option regarding migration control during aggressive  source remediation would be scenario "C" (P&T
using the existing treatment system with some modifications). This should be feasible for a period of
aggressive source remediation that lasts several years. One option would be to only pump at EW-7 during
this period (generally consistent with capture near the Cochato River provided by the current system). A
more costly option would be to add additional extraction wells to the north (such as a replacement for
EW-9, and one or more extraction wells between EW-7 and EW-9). Deciding between these options may
depend on the results of the suggested sediment sampling (See Section 6.1.2). If the sediment results are
not elevated under current conditions near EW-9, or between EW-7 and EW-9, then several additional
years of discharge to surface water similar to current conditions may be acceptable to site stakeholders
while the aggressive source remediation is performed. This would eliminate the need for new extraction
wells and associated equipment and or piping.

Scenario "D" would be the most costly option regarding migration control during additional, aggressive
source remediation because it would include design, capital purchase and installation of a new treatment
plant. The optimization review team does not favor this scenario, because it believes that additional,
aggressive source remediation should only be attempted if it is believed it will be successful in ultimately
eliminating the long-term need for migration control,  therefore, it is not desirable to invest in a new
treatment plant in conjunction with additional aggressive source area remediation.


6.5    RECOMMENDATIONS RELATED TO GREEN REMEDIATION

No green remediation recommendations are provided. Recommendations are focused on remedial
effectiveness and remedial strategy. Green remediation practices  can be considered once the site team has
decided on the optimal remedial approach.
                                              47

-------
6.6    SUGGESTED APPROACH TO IMPLEMENTING RECOMMENDATIONS

The optimization review team recommends implementing the recommendations in Section 6.1 and
Section 6.3.1, and then following the decision flow chart presented in Figure 6-1 and Section 6.4.
Recommendations in Sections 6.2.1, 6.2.2, and Section 6.2.3 can be considered if consistent with the
decisions made during implementation of recommendations in Sections 6.2.4 and 6.4.
                                         48

-------
Table 6-1. Cost Summary Table
Recommendation
6.1.1 RESUME FISH TISSUE
SAMPLING
6.1.2 SAMPLE THE
COCHATO RIVER SEDIMENTS
USING THE INCREMENTAL
SAMPLING METHOD
6.1.3 CONDUCT
SPECIATION ANALYSIS FOR
ARSENIC IN SELECT
MONITORING WELLS
6.1.4 ADD TPH AND TOC TO
LABORATORY ANALYSES
FOR ROUTINE
GROUNDWATER
MONITORING
6.1.5 PERFORM LEACHING
TESTS ON SITE SOILS TO
BETTER UNDERSTAND IF SITE
SOILS ARE A CONTINUING
SOURCE OF ARSENIC
6.2. 1 REDUCE TREATMENT
PLANT REPORTING
6.2.2 OPTIMIZE METALS
REMOVAL SYSTEM
6.2.3 DISCONTINUE
AERATION IN ACTIVATED
SLUDGE UNITS
6.2.4 POTENTIAL LONG-
TERM COST SAVINGS FROM
REMEDIATION SCENARIOS
6.3.1 RECORD AND REPORT
ORP RESULTS WITH
GROUNDWATER
MONITORING DATA
6.4.1 DETERMINE IF
PRIMARY FOCUS WILL BE
SOURCE REMEDIATION OR
CONTAINMENT
6.4.2 PILOT TESTING AND
LNAPL CHARACTERIZATION
6.4.3 CONSIDERATIONS
FOR IMPROVING MIGRATION
CONTROL IN CONJUNCTION
WITH MORE AGGRESSIVE
SOURCE REMEDIATION
Category
Effectiveness
Effectiveness
Effectiveness
Effectiveness
Effectiveness
Cost
Reduction
Cost
Reduction
Cost
Reduction
Cost
Reduction
Technical
Improvement
Site Closeout
Site Closeout
Site Closeout
Additional
Capital Cost
$9,000
$15,000
$5,000
$0
$25,000
Change in
Annual Cost
$25,000 once
every five years
$15,000
$0
$3,000
$0
Change in Life-
Cycle Cost
(3% discount rate)
30 years*
$125,000
30 years*
$309,000
30 years*
$5,000
30 years*
$59,000
$25,000
Not Estimated
$30,000
$0
($10,000)
($9,000)
5 years*
($20,000)
30 years*
($176,000)
See Section 6.4
$0
$0
$0
See Table 6-2
See Table 6-2
See Table 6-2
*Time frame indicated is a representative time frame selected by the optimization team for cost estimating purposes.

-------
Table 6-2. Estimated Cost Summary Matrix for Site Closeout Considerations


Extraction system
improvements and capture
zone analysis
Treatment system
upgrades
Source area
characterization
Pilot testing
Source remedy equipment
Annual costs (and
duration in years) for
treatment plant operation
Annual costs (and
duration in years) for
source remedy operation
Estimated life-cycle cost
(no discounting)
Estimated Costs
Scenario A
$250,000
$1,250,000**



$500,000 (30+)
$0
$11,300,000
to over
$16,500,000
Scenario B


$460,000
$300,000
$500,000
$0
$3,850,000 (2)
$8,960,000
Scenario C
Up to $250,000*
$100,000
$460,000
$300,000
$500,000
$900,000 (4)
$3,850,000 (2)
$12,910,000
Scenario D
Up to $250,000*
$1,250,000**
$460,000
$300,000
$500,000
$500,000 (5)
$3,850,000 (2)
$12,960,000
Scenario A - Containment only with continued LNAPL recovery (estimated life-cycle cost range based on various
assumptions regarding duration and discounting over the long operation period.
Scenario B - Source remediation without containment (no discounting of costs to present value)
Scenario C - Source remediation with containment provided by existing system (assumes all repairs and
modifications to treatment plant are conducted with the annual O&M cost) (no discounting of costs to present
value).
Scenario D - Source remediation with containment provided by new system (no discounting of costs to present
value)

All source remediation scenarios cost estimates assume the ISCO approach as presented in the text and a target
area similar in size to the LNAPL extent identified on Figure B-4 (See Appendix A). The actual source area for
treatment could be smaller or larger depending on the outcome of the source area characterization.

All cost estimates are feasibility level cost estimates and are depending on findings from  additional characterization
and pilot studies.

^Containment strategies could range from partial containment by operating EW-7 only, which would require little
or no capture zone analysis and extraction system improvements, or more comprehensive capture that could require
up to $250,000.
 ** Presented estimated cost represents an average of two presented costs ($1,000,000 and $1,500,000).

-------
ATTACHMENT A:  Figures from Existing Site Reports

-------
                                 SCALE 1:24 000
                                                                   •
                 moo
   MASS.
                           1000   2000   30QQ  WOO
                                                   , i    7000 FEET
                                                       1 KIL "
..JIM:
            COORDINAT

             J32494mE; 4668219mN
                              A
                              • r
                                  RTN  3-0333
                                       DESCF-r

CJM

Co VI
                                                                   ' '
                                                                   •
    BASE MAP: IISOS TOPOGRAPHIC MAP PRINTED FROM TOPO! 1998 WlLDFLOWCR PROD1.
eanHarbor
>^^^«_^—-^«_^—»•—^
I NVIRDNMENTAL SERVICES
REMEDIAL  INVESTIGATIONS

42 Longvmtcr Drive
Norwell, Massachusetts HPOftl
Telephone (781) 79?-cjnnn
                              BAIRD  A MCGUIRE  SUPERFUND  SITF

                                     775 SOUTH STREET

                              HOLBROOK,  MASSACHUSETTS


                                     LOCUS   MAP
                        RftOJCCT NO. EOIG04M7
                                       DWG Mi i.
                        SCALE  AS
                                         4547  A 01
 FIGURE  1

-------

-------

V

-------

                                                                                                            1
            .
;i

 '-yCjV  V*1 •>'
   -     Y  r+   *S*\

    "-   •   •$&.





 •'
     ft  •  '.
        X
—

 •\'    %
   :
               ,
   •'•  Wa'   /v ':  ••'
 p*




 ~~'


 X^T"
 •^•.

?««»: -=fe
 ».„.-.  •
                                         ES

                                          ,—-
i-\T  ;

                                        '  "''. ":     '

                                               '•--," ..--"-•.

                                                                                                                                   ;
                                                                                                                             , ^^

-------
                                                                                                                                                                                                                          NORTHSAST
                                                                                                                                                                                                                          CONSULTANTS
                                                                                                                                                                                                                          B-8  i960
                                                                                                                                                                                                         TOWN WELL       LOCATION
                                                                                                                                                                                                             ND,3           &P
                      910 (119.2)      B-ZT UI8.9)
NOTES.
   I) REFER  TO  FIGURE  4-| FOR  NOTES  AND  LEGEND
   2) REFER  TO  DWG. No SP-I FDR PROFILE  LOCATION
                                                                                                                                                                                                                   Ur=>  \fesofj.
                                                                                                                                                                                                                    CD]   REMEDIAL INVESTIGATION/FEASIBILITY
                                                                                                                                                                                                              Hi  III  ]]  ] BAIHO & M=CU«E  SITE .  MOUBROOK ,
                                                                                                                                                                                                          !..< AS  NOTED
                                                                                                                                                                                                                                 iUBSUftfACE
                                                                                                                                                                                                                                      6 - B'

-------
     1



     UJ
         160 r
         140- •
         I20--
         100
          80 J-
                        908(152 .7)
8M-27U45.7)    RC-I (133.7)
    30'N
                                                                                                                                                                     A'
NOTES:
  I) THE STRATIFICATION LINES REPRESENT  THE  APPROXIMATE  BOUNDARIES BETWEEN
    SOIL TYPES AND ARE  BASEDUPON INTERPOLATION BETWEEN W'OELY SPACED EXPLORATIONS.
    THEREFORE, ACTUAL CONDITIONS MAY VARY FROM THOSE  SHOWN.

 2) REFER TO TEXT FOR DETAILED DESCRIPTION OF SOIL STRATA.

 3) WATER LEVtL  READINGS WERE MADE IN THE OBSERVATION WELLS AS STATED IN THE TEXT.
    FLUCTUATIONS  IN THE LEVEL OF GROUNDWATER MAY OCCUR DUE TO ""ACTORS NOT ACCOUNTED
    FOR AT THE  TIME MEASUREMENTS WERE MADE.

 4) REFER TO  SP-i FOR  ADDITIONAL NOTES,  LESEND AND  PROFILE LOCATION
 5) STRATIGRAPHIC INTERPRETATIONS FROM  FIELD BORING  LOGS PREPARED  6Y  GZA AND GHR.

           BM-35II28.0)	BORING LOCATION AND NUMBER  AND ( GROUND EL E VAT ION )
                 «„	OFFSET  FROM PROFILE  LINE
                     -WATER  TABLE  (9/27/84)
                     	WELL SCREEN
       -VERTICAL-

     10'    20'
                                                                                                                                                                                 -1-160
                                                                                                                                                                                 -•140
                                                                                                                                                                                 •-I20
                                                                                                                                                                                 -•IOO
                                                                                                                                                                                 ••80
                                                                                                                                -•60
                                                                                                                                                                                 J-20
• CA- onivc "AurLEn " HORIZONTAL -
• 	 	 	 BOTTOM OF BORING
f — - CORED ROCK
R . REFUSAL
GH



».~ii;jf f ffifll
— "P>f— -(£)
•on AS NOTED IT
..re ^/'iltf/glB
*»OrfECT
REMEDIAL INVESTIGATION/FEASIBILITY STUD"
BAlRO 8 McGUIRE SITE . HOLBROOK .MA.
NU5 CORPORATION
^ SUBSURFACE PROFILE
A - A'
•
-•* 4-1

-------
140 -
                                                                                          -  140
                                                                               COCHATO
                                                                                 RIVER
 BM-7 (121.0)

      915 (123.2)
                                                                       BM-17 (123.2)
                                                            TOP
                                                          ORGANIC  SILT. PEA
                                                           _FINE  TO
                                                           MEDIUM
                                  :INE
                                    AND  SILT
                                                            FINE  TO
                                                            COARSE
                                                            SAND
                                                                AND  FINE
                                                               "\SAND
                                                                    GLACIAL
                                                                       TILL
        NOTES:DR£FER  TO  FIGURE  4-1
                  FOR  NOTES  AND  LEGEND
                2)REFER  TO  DWG. No. SP-I  FOR
                  PROFILE  LOCATION
                 -VERTICAL-
               10'    20'
               50     (00
               -HORIZONTAL-
                                        REMEDIAL INVESTIGATION/FEASIBILITY  STUDY
                                        BAIRD 8 McGUlRE  SITE . HO LB ROOK. MA.
                                            NUS  CORPORATION
                                            PITTSBURGH, PA.
                         »4» »»PJ ( *m rt
                            AS NOTED
                            4/2W85
SUBSURFACE  PROFILE
     C-C'

-------
NOTES:
               LEGEND
                        G VK.U.

              GfiouNOWATtR EXTRACTION WELL

              PROPERTY UNE
  BASE MAP OBTAINED FROM A METCALF It EDDY PUN ENTITLED: EXISTING
  MONITORING WELL LOCATION PLAN. SHEET AE-3. REVISION A. DATED 12/03.
  EXTRACTION AND MONITORING WELL LOCATIONS. REFERENCE ELEVATIONS.
  AND OPERATIONAL STATUS vfcRE DETERMINED BI REWEW OF HISTORICAL
     ACTION WELLS AND PIPING ROUTES WERE OBTAINED FRON AN OHM
                             FIGURE  3
A   RTN: 4-3000333
       leanhlarbor
     ENVIRONMENTAL  SERVICES
             AI_
             Longno
     BAIRD & McGUIRE GROUNDWATIR TREATMENT PLANT
            EX TRACTION /RECHARGE SYSTEM
             HOLBROOK. MASSACHUSETTS


             DECEMBER 2011
OVERBURDEN GROUNDWATER CONTOURS

-------
                 LEGEND
  u*-9T-is • ••       ACTIVE MONITORING MEli.

     r*-8 *       WOUNDWATER EXTRACTION WEU

	     PROPERTY LINE




NOTES:

   BASE MAP OBTAINED (ROM A UETCALF ft EOOY PLAN ENTITLED: EXISTING
   MONITORING «U LOCATION PLAN. SHEET AE-J. REVISION A. DATED 12/01
   EXTRACTION AND UOMTORINC NELL LOCATIONS. REFERENCE ELEVATIONS.
   AW OPERATIONAL STATUS WRt DETERMINED BY RtWE* Of HrSTORCAi.
   DOCUMENTS PROVIDED BY EPA AND PHYSICAL INSPECTION QF THC STE

   EXTRACTION «US AND PIP1NC ROUTES WERE OBTAIN£0 FRON AN QMM
   RO4EDIATKM SERVICES CORP, PLAN ENTITLES PROPOSED GRADING PLAN.
   BA.RO ft McCUifiE SuPERrLWD SITE. HOlBROOK. MASSACHUSETTS. DRAWNC
   NO 13500-0*2. SHEET I  Of 1, DATED 5/15/9B.
                                FIGURE  4
 A  RTN: 1-3000333
                                        LI  1/T2
         leanHarbor
         ^—•*•—^—^—^—^-—^*^
     ENVIRONMENTAL   SERVICES
     REMEDIAL  IMVEST I GAT I QMS
                    C7SI) 79g-5000
      BAtRO & McCUtRE CROUNDWA.TER TRtATUENT PLANT
             EXTRACT10N/R£CHARGC SYSTEM
              HOLBROOK, MASSACHU^TTS
               DECEMBER 2011
    BEDROCK GROUNDWATER CONTOURS

-------
FIGURE 2A

-------
                        Baird & McGuire
                        Superfund Site
Connecticut Rhodejsland
                                                                       Sylvan Lake k
                          Biard & McGuire
                                                     Lake Holbrook
                                                                         FIGURE 3
                                                                 BAIRD AND McGUIRE SEDIMEMT
                                                                   SAMPLING LOCA TION MAP
                                                                  HOLBROOK, MASSACHUSETTS

-------
                                                                                                                                                                                Additional Fencing
                                                                                                                                                                                Roads
                                                                                                                                                                                Streams
                                                                                                                                                                                Wetland Delineation
                                                                                                                                                                                100 Year Floodplain
                                                                                                                                                                                Ponds and Waterbodies
                                                                                                                                                                                Baird & McGuire
                                                                                                                                                                                Property
Cochato River
Groundwater
Recharge
                                                                                                                                                              MAP SOURCE;
                                                                                                                                                              H««« M»p i« Irwn t»mm TopograpNo* !M»y 4. 198
                                                                                                                                                              Site fe«urei are compiled Ifofn numarmit protect
                                                                                                                                                                     dotum»nt». All location*
                                                              - Baird & 'McGuir
                                                                Property


-------
ATTACHMENT B: : Figures Prepared by Optimization Team

-------
              LEGEND
             ACTIVE MONITORING «CLL
             CROUNOHA1ER EXTRACTION *
             PROPEBTV UNt
BASE MAP OBTAINED FTOU Ik HIKHf ft EOOT PLAN ENTITLED: EXISTTIG
MOWTOHIttG WU. LOCATION PLAN. SHEET AE-3. REVISION A. DATED 12/03
EXTRACTION A«D gQNITOHlNC WELL LOCATIONS. RtfTRENCE ELEVATIONS.
       »EUS AND PIPING ROUTES WERE OBTAINED FHCH AN OHM
BEI«OIAT10N SEBWCES COBP PLAN ENTITLED; PROPOSED GfiAONO PUW.
BA1RO * UcOBTC SUPERFUNO STE. HOIBR.OW. UASSACMUSETTS, WAHWIG
NO. 1J5OO-OSI, SHEET 1 OF t, DATED 5/13/98.
      LEGEND
        < GW-1 standards
     O <10x GW-1 standards
     O > lOx & < 50x GW-1 standards
     • > 50x GW-1 standards
        * Highest SVOC exceedance is
         shown

     O  NAPL observed between Oct.
         2009 and Sept. 2010
      Note: base map used is from Figure
      2 of the 2009/2010 Annual Report
Figure B-l.
Summary of July 2011
Sampling Results for SVOCs

-------
NOTES:
               LEGEND

              SO* AHHA* SORWC
              AflsEWC SOL iCRMC

              ACTIVE UCMITCHIIK WOi
              CfrouNDWATEB ETCTRACTOt W
  WWrtTOHINC WEIL LOCATION PVAN. SHETT *
  EHTP.ACT1W «US AND PIPWG BOOTES «£« OBTAINED F»ON AN CWU
  REt«I>AT10N SCTVKES CC*P PLAN ENTTTIED WTOPOSIQ ORAOINC PUW.
  BA«0 * UCOJIHE SUPEBFUNO STI. NO.BIWX, UA
  NO. 12900-OU. SHEET T OF I. OArED 5/1S/9S
        LEGEND
       •  < GW-1 standard
       O  < lOx GW-1 standard
       O  > lOx & < 50x GW-1 standard
       •  >50x GW-1 standard
       O NAPL observed between Oct.
          2009 and Sept. 2010
        Note: base map used is from Figure
        2 of the 2009/2010 Annual Report
    Note: results are for dissolved
    arsenic for direct push samples
    (ASB locations) collected between
    2009 and 2011 and total arsenic
    for monitoring wells sampled in
    July 2011

  Figure B-2.
  Summary of  2011 Sampling
  Results for  Arsenic

-------
                       LEGEND
                      ACTIVE MOMTORMG «ELL
                      CHOUNOWATES EXTRACTION I
                      PROPERTY UNE
         BASE MAP OBTAINED fnoy A icrcAif * EDOV PLAN ENTITLED- EWSTWC
         UOMTDRMC «CLL LOCATION »-LAN. SCET AE-3. ftCVOON A, DATED 12/05
         EXTRACnw AND WOMTQRMG KLL LOCATIOMS. MEFEKNCE ELEVA1WMS,
         AND OPERA TXXAL STATUS MERC DETERMNCD BY REME* OF WSTORCAL
         DOCUMENTS PROMOCD BY EPA AND PHV9CAL NSPCCTtON OF THE STTEL

         EXTRACTXM "TU^ AND PfWC ROUTES tOI 06TAICD ntON AN »•)
         ROd>ATIOM SERWCES CORP. PLAN ENTTTLED: PROPOSED CRAOMC PLAN,
         MM) * UcOUME SUPEDFUND 9TC. MDL6ROOK. MASSACHUSETTS. DRADMC
         WO  1250O-05Z S€ET 1 QF 1. DATED 5/15/96.
                                        . 907. 907*. MTB
               LEGEND
               O < GW-1 standards
               O < lOx GW-1 standards
               O > lOx & < 50x GW-1 standards
               • >50x GW-1 standards
                 •Highest pesticide exceedance
                  is shown

               O  NAPL observed between Oct.
                  2009 and Sept. 2010
               Note: base map used is from Figure
               2 of the 2009/2010 Annual Report
f\
         Figure B-3.
         Summary of July 2011
         Sampling Results for
         Pesticides

-------
                                                                           SAB-J +
                                                                           AS8-2+
                                                                        NOTES:
Approx. extent of NAPl
as of 1997 LNAPL
nvestigatiop plus
subsequent data
evaluation reports  •
 LEGEND

SOIL ARRAY BORING
ARSENIC SOIL BORING
ACTIVE MONITORING WEU
GROUNOWATER EXTRACTION WELL

PROPERTY LINE
                                                                           BASE MAP OBTAINED FROW A METCALF * EDDY PLAN ENTITLED: EXISTING
                                                                           MONITORING WELL LOCATION PLAN, SHEET AE-3. REASON A. DATED 12/03.
                                                                           EXTRACTION AND MONITORING WELL LOCATIONS. REFERENCE ELEVATIONS,
                                                                           AND OPERATIONAL STATUS WERE DETERMINED BY REVIEW OF HISTORICAL
                                                                           DOCUMENTS PROVIDED BY EPA AND PHYSICAL INSPECTION OF THE SITE.

                                                                           EXTRACTION WELLS AND PIPING ROUTES WERE OBTAINED FRON AN OHM
                                                                           REMEDIATION SERVICES CORP. PLAN ENTITLED: PROPOSED GRADING PLAN.
                                                                           8A1RD & McCUIRE SUPERRIND SITE. HQLBROOK. U ASS ACHU SETTS, DRAWING
                                                                           NO. 12500-052. SHEET 1 OF 1. DATED 5/15/96
                                                                                                           * 907. B07A. M7B
                                                                                       K MS. 905A, 9056
                                                                                 LEGEND
                                                                                 •   lOx & < 50x GW-1 standard
                                                                                 •  > 50x GW-1 standard

                                                                                  •   1997 Geoprobe location

                                                                                 O  NAPL observed between Oct.
                                                                                     2009 and Sept. 2010
                                                                                 Note: base map used is from Figure
                                                                                 2 of the 2009/2010 Annual Report
                                                                          Figure B-4.
                                                                          Approximate Historical Extent
                                                                          of NAPL
                                                                          (with July 2011 Arsenic Sampling
                                                                          Results)

-------
             Figure B-5. pH/eH diagram for MW97-21
Eh/pH Vs. Arsenic Immobilization in Groundwater
1 i
1 -
08 -
£ Q6 -
> 0*
U ri
!c ° 2 ~
uj
0 -
-02 -
OA
.**
-0.6
n P
tafc*^ Z°n
fflBte^i^ |mnr
Arsenate^l^^^^
Arsenite

-------
                Figure B-6. pH/eH diagram for MW97-17
Eh/pH Vs. Arsenic Immobilization in Groundwater
                                  Zone of Arsenic
                                  Immobility
          Arsenite
                          Ferrous
    -0.4 —
    -0.6 -- Water Redui:
                T
                                     8
                                 PH
Parameter
Arsenic (mg/L)
Iron (mg/L)
ORP(mV)
Eh (mV)
                                                         ecL
   FIGURE4-2:  ARSENIC MOBILITY IN GROUNDWATE pH
       Eh/pH CONDITIONS ON THE SPECIATION OF ARSENIC AND IRON
                         (WELCH, 2000)
2010
0.425
 NA
-105
 95
6.75

2011
0.182
2.15
-54.7
145.3
7.07

-------
                Figure B-7. pH/eH diagram for MW97-12
Eh/pH Vs. Arsenic Immobilization in Groundwater
                                  Zone of Arsenic
                                  Immobility
                  Arsenate
               ^vJ^
          Arsenite "^

                                             Parameter
Arsenic (rng/L)
Iron (mg/L)
ORP(mV)
Eh (mV)
                                 PH
   FIGURE 4-2:  ARSENIC MOBILITY IN GROUNDWATER AS
       Eh/pH CONDITIONS ON THE SPECIATION OF ARSENIC AND IRON
                         (WELCH, 2000)
            2010
0.387
 NA
-87.7
112.3
6.33
        2011
 1.47
 78.3
-126.8
 73.2
 6.63

-------
               Figure B-8. pH/eH diagram for MW97-20
Eh/pH Vs. Arsenic Immobilization in Groundwater
                                Zone of Arsenic
                                Immobility

   :IGURE 4-2: ARSENIC MOBILITY IN GROUNDWATER AS UUN i KULLtu
      Eh/pH CONDITIONS ON THE SPECIATION OF ARSENIC AND IRON
                        (WELCH, 2000)
                                                               2011
                                                              0.00176
                                                               0.151
                                                                67
                                                                267
                                                                5.98

-------
    1.8
               Figure B-9. ORP vs. Arsenic for July 2011 Sampling Event
    1.6

    1.4

    1.2
                          4 Sample from Unconsolidated Aquifer Within
                           Excavation Area
                          • Sample From Unconsolidate Aquifer Outside
                           Excavation Area
                           Bedrock Aquifer Sample
    0.8
0)
M
    0.6

    0.4

    0.2

      0
-400
                   -300
-200
-100         0
   ORP (mV)
100
200
300

-------
ATTACHMENT C: Historic VOC and SVOC Trends at Selected Wells

-------
Aug-87   May-90   Jan-93   Oct-95    Jul-98    Apr-01    Jan-04

                        Date Sampled
Figure 4. Total VOC Concentrations for Select Overburden Wells in
                   Area A (East Side of River)
9n
1R
1fi

"JT 12
1
c „
S B
a 6
A •

0 -


/ \
7_ X
* K \
/ \ \\

1 \ \\/ >v
V^ N
'^x^-r^^-^fc^- _

-«-910A
-•-919
— 1— M-7SO

Jan-93 Jun-94 Oct-95 Mar-97 Jul-98 Dec-99 Apr-01 Sep-02 Jan-04
Date Sampled
Figure 5a. Total VOC Concentrations for Select Overburden Wells in
Area C (North of Plume)

-------
 Aug-87  May-90  Jan-93   Oct-95   Jul-98   Apr-01  Jan-04  Oct-06

                         Date Sampled
Figure 5b. Total VOC Concentrations for Select Overburden Wells in
                     Area C (North of Plume)
 Jan-93  Jun-94 Oct-95 Mar-97  Jul-98  Dec-99  Apr-01 Sep-02 Jan-04

                         Date Sampled
Figure 5c. Total VOC Concentrations for Select Overburden Wells in

                     Area C (North of Plume)

-------
 Aug-87   May-90    Jan-93    Oct-95    Jul-98    Apr-01    Jan-04

                        Date Sampled
Figure 6. Total VOC Concentrations for Select Bedrock Wells in Area
                       C (North of Plume)
          May-90    Jan-93    Oct-95    Jul-98    Apr-01    Jan-04
                         Date Sampled
Figure 7. Total VOC Concentrations for Select Bedrock Wells in Area
                       D (South of Plume)

-------
 Jan-93 Jun-94  Oct-95 Mar-97  Jul-98 Dec-99 Apr-01 Sep-02 Jan-04

                         Date Sampled
Figure 8a. Total VOC Concentrations for Select Extraction Wells in
                      Area B (Plume Wells)
  Jan-93 Jun-94 Oct-95  Mar-97 Jul-98 Dec-99 Apr-01 Sep-02 Jan-04

                         Date Sampled
Figure 8b.  Total VOC Concentrations for Select Extraction Wells in
                      Area B (Plume Wells)

-------
   Mar-97
Jul-98
Dec-99
Apr-01
Sep-02
Jan-04
                         Date Sampled
Figure 9a. Total VOC Concentrations for Select Overburden Wells in

                      Area B (Plume Wells)

5000
a 4000
I
^

— •— MW-97-10
-*-MW-97-17
-•-MW-97-21
-•-MW-97-22

Jun-94 Oct-95 Mar-97 Jul-98 Dec-99 Apr-01 Sep-02 Jan-04
Date Sampled
Figure 9b. Total VOC Concentrations for Select Overburden Wells in
Area B (Plume Wells)

-------
2000
  Aug-87   May-90   Jan-93   Oct-95    Jul-98

                        E
                    loncei

                    Area B (Plume Wells)
                                                     Jan-04
                          Date Sampled
Figure 9c. Total VOC Concentrations for Select Overburden Wells in

-------
   30



   25

2

B 20
c
o
"f  15
                                                                    -*-M-4BR
   Jun-94   Oct-95  Mar-97   Jul-98   Dec-99   Apr-01  Sep-02   Jan-04

                          Date Sampled
  Figure 10. Total VOC Concentrations for Bedrock Well M-4BR in Area

                          B (Plume Wells)
   2000
     0 a
                                                                        -BM-17
     Aug-87   May-90   Jan-93   Oct-95    Jul-98   Apr-01    Jan-04

                           Date Sampled
                        )C Concentrations for Overl

                         Area A (East Side of River)
                      Date Sampled
Figure 11. Total SVOC Concentrations for Overburden Well BM-17 in

-------
   10000
      Aug-87   May-90  Jan-93   Oct-95   Jul-98    Apr-01    Jan-04
                            Date Sampled
  Figure 12a. Total SVOC Concentrations for Select Overburden Wells
                       in Area B (Plume Wells)
                               \
   15000

   12500

"S
a. 10000
    7500
    5000
    2500
      Aug-87   May-90   Jan-93   Oct-95   Jul-98    Apr-01    Jan-04
                            Date Sampled
  Figure 12b. Total SVOC Concentrations for Select Overburden Wells
                       In Area B (Plume Wells)

-------
   700000



   600000



f[ 500000
a.


§ 400000


1
i 300000

8

Q 200000



   100000
                                                    4.545,000 ppb in

                                                    2000
       Aug-87  May-90   Jan-93   Oct-95    Jul-98    Apr-01   Jan-04

                             Date Sampled
  Figure 12c. Total SVOC Concentrations for Select Overburden Wells

                        in Area B (Plume Wells)
   12500
   10000
.o
Q.
a
8

o
o
    7500
    5000
    2500
      Aug-87  May-90   Jan-93    Oct-95   Jul-98   Apr-01    Jan-04

                            Date Sampled
  Figure 13. Total SVOC Concentrations for Select Extraction Wells in

                        Area B (Plume Wells)

-------
Jan-93 Jun-94  Oct-95  Mar-97  Jul-98  Dec-99  Apr-01 Sep-02 Jan-04

                        Date Sampled
Figure 14. Dissolved Arsenic Concentrations for Select Overburden

               Wells in Area C (North of the Plume)
Jan-93  Jun-94 Oct-95  Mar-97
                                  Dec-99 Apr-01  Sep-02 Jan-04
                         Date Sampled
Figure 15.  Dissolved Arsenic Concentrations for Select Overburden

                  Wells in Area B (Plume Wells)

-------
   30000
  25000-
   20000-
I

i
   15000
   10000
    5000
                                                                            •Station A
                                                                            •Station E
                                                                            - Station B
                                                                            • Station C (Bank)
                                                                            - Station C (River)
                                                                            •Station D (Bank)
                                                                            -Station D (River)
                                                                            - Program Action Limit (Bank)
                                                                            • Program Action Limit (River)
                                                                                                                  Program Action Limits:

                                                                                                                  Bank Locations = 28,500 ng/g
                                                                                                                  River Locations = 19.000 ng/g
                        1997
1998
    1999
Year Sampled
2000
2001
2002
  Figure 16. Station Mean Concentrations of Total DDT in River Sediment and Bank Samples Collected Along the Cochato River from
                                                     1996 to 2002

-------
 8000
                                                                                                               —*— Station A
                                                                                                               -•- Station E
                                                                                                               -*-Station B
                                                                                                               —H— Station C (Bank)
                                                                                                               —*— Station C (River)
                                                                                                               -•-Station D (Bank)
                                                                                                               —I—Station D (River)
                                                                                                               	Program Action Limit (Bank)
                                                                                                                	Program Action Limit (River)
                                                                                                                 Program Action Limits:

                                                                                                                 Bank Locations = 7.500 raj/g
                                                                                                                 River Locations = 5,000 ng/g
                      1997
                                       1998
    1999
Year Sampled
                                                                         2000
                                                                                          2001
                                                                                                            2002
Figure 17. Station Mean Concentrations of Total Chlordane in River Sediment and Bank Samples Collected Along the Cochato River
                                                  from 1996 to 2002

-------
 40000
  35000
                                                                                                               —•—Station A
                                                                                                               —•— Station E
                                                                                                               —*r- Station B
                                                                                                               —*— Station C (Bank)
                                                                                                               -*- Station C (River)
                                                                                                               -•- Station D (Bank)
                                                                                                                ^—Station D (River)
                                                                                                                — Program Action Limit (Bank)
                                                                                                                — Program Action Limit (River)
                                                                                                                Program Action Limits:

                                                                                                                Bank Locations = 33,000 ng/g
                                                                                                                River Locations = 22.000 ng/g
      1996
                       1997
                                        1998
    1999
Year Sampled
                                                                         2000
                                                                                          2001
                                                                                                           2002
Figure 18. Station Mean Concentrations of Total PAHs in River Sediment and Bank Samples Collected Along the Cochato River from
                                                    1996 to 2002

-------
400
350
                                                                                                                      Station A
                                                                                                                      Station E
                                                                                                                      Station B
                                                                                                                      Station C (Bank)
                                                                                                                      Station C (River)
                                                                                                                      Station D (Bank)
                                                                                                                      Station D (River)
                                                                                                                      Program Action Limit (Bank)
                                                                                                                      Program Action Limit (River)
                                                                                                                  Program Action Limits:

                                                                                                                  Bank Locations = 375 ug/g
                                                                                                                  River Locations = 250 ug/g
                     1997
                                      1998
    1999
Year Sampled
                                                                          2000
                                                                                           2001
                                                                                                             2002
Figure 19. Station Mean Concentrations of Arsenic in River Sediment and Bank Samples Collected Along the Cochato River from
                                                    1996 to 2002

-------
12000
10000
 8000
 6000
 4000
 2000
                                                                                                Station A
                                                                                                Station B
                                                                                                Station C
                                                                                                Station D
                                                                                                Sylvan Lake
                                                                                                Program Action Limit
     1990
1992
                 1994
    1996
Year Sampled
                                                                           1998
2000
                 2002
                           Figure 20.  Average Fish Fillet Concentrations: Total DDT

-------
1800
1600
                                                                                                                           Station A
                                                                                                                           Station B
                                                                                                                           Station C
                                                                                                                           Station D
                                                                                                                           Sylvan Lake
                                                                                                                           Program Action Limit
 200
    1990
1992
1&94
1996              1998
Year Sampled
2000
                                                                      2002
                                 Figure 21. Average Fish Fillet Concentrations: Total Chlordane

-------
200
180
   1995
1996
1997
1998           1999
    Year Sampled
                                                                              2000
                                                                            2001
                                                                                                                  •  Station A
                                                                                                                —•—Station B
                                                                                                                —A— Station C
                                                                                                                —K— Station D
                                                                                                                     Sylvan Lake
                                                                                                                     Program Action Limit
                                                                                                            2002
                          Figure 22. Average Fish Fillet Concentrations: Total PAHs

-------