United States      Office of Water  EPA841 -R-97-004
Environmental Protection (4503F)        May 1997
Agency	
Information
Management
for the Watershed
Approach
in the Pacific Northwest
                    THE WATERSHED \ < v i >
                     Information Transfer Series

-------

-------
                                  EPA841-R-97-006
                                  May 1997
            i ii i WATERSHED ACAD
            • Information Transfer Series, No. 6 •
  Information Management
for the Watershed Approach
   in the Pacific Northwest
      Assessment and Watershed Protection Division,
    Office of Wetlands, Oceans and Watersheds (4503F)
                   and
               Permits Division,
        Office of Wastewater Management (4203)

               Office of Water
        U.S. Environmental Protection Agency
               401 M Street, SW
             Washington, DC 20460

-------
11

-------
                                     FOREWORD
The watershed approach has changed the way that
the U.S. Environmental Protection Agency (EPA)
and  other  federal,  tribal and state  agencies
formerly managed water resources programs. We
now  generally  recognize  that  the  critical
environmental  issues  facing  society  are so
intertwined that a comprehensive, ecosystem-
based and community-based approach is needed.
We also  recognize that solving environmental
problems   depends  increasingly   on  local
governments and local citizens.  Thus, the need to
integrate  across traditional water program areas
(e.g.,   flood  control,  wastewater   treatment,
nonpoint  source pollution  control)  and to
cooperate across levels of government (federal,
state, tribal, local) and across public and private
sectors is leading toward a watershed approach.

Public and  private  organizations,  academic
institutions, and citizens and their governments in
thousands of communities across the  nation are
forming partnerships  and  learning  new ways to
manage their watersheds together.  These groups
seek  guidance   and  examples of  watershed
approach  success stories after which to model
their own activities.  The EPA Office of Water
established the  Watershed Academy to  help
address these needs  by providing training for
watershed managers based on local, state, tribal,
and   federal  experiences  in  implementing
watershed approaches throughout the past decade.
The  Watershed  Academy provides technical
watershed information and outreach through live
training courses,  the Internet, and  published
documents.  The Academy offers live training
courses on the basics of watershed management
and maintains a training catalogue  concerning
where  to  obtain more advanced training.   An
Internet   distance   learning  program  called
Academy  2000 is being developed to help serve
the training needs of those who cannot attend the
live  courses.  The Watershed Academy  also
provides watershed approach reference materials,
such as this document, through the Watershed
Academy Information Transfer Series.
This document, number 6 in the Series, centers on
a series  of interviews  with  leaders  and key
participants in the statewide watershed approach
activities in  the  State  of  Washington.   The
document  reviews  Washington's   statewide
watershed  activities  in  case  study  fashion.
Following this review, the  document describes
how a watershed information clearinghouse can
serve multiple planning, information management
and communication roles for watershed groups.

The Information Transfer Series titles include:

no. 1:  Watersh ed protection: a project focus
       (EPA841-R-95-003)

no. 2:  Watershed protection: a statewide
       approach (EPA841-R-95-004)

no. 3:  Monitoring consortiums: A cost-
       effective means to enhancing
       watershed data collection and analysis
       (EPA841-R-97-006)

no. 4:  Land cover digital data directory for
       the United States (EPA841-B-97-005)

no. 5:  Designing an information management
       system for watersheds (EPA841-R-97-
       005)

no. 6:  Information management for the
       watershed approach in the Pacific
       Northwest (EPA841-R-97-004)

no. 7:  Watershed Academy catalogue of
       watershed training opportunities
       (EPA841-D-97-001)
                                              in

-------
This document was prepared for the U.S. Environmental Protection Agency's Office of Water
under partial support from each of three EPA contracts, including Contract 68-C3-0303 with
Tetra Tech, Inc., Contract 68-C3-0342 with The Cadmus Group, Inc., and Contract 68-C4-0034
with Science Applications International Corporation (SAIC).  Clayton Creager of Tetra Tech,
Inc. and Nancy Winters of SAIC are the document's primary authors, and Douglas J. Norton and
Greg Currey of the EPA Office of Water are the project managers. Partial funding provided by
Molly Whitworth of the Office of Sustainable Ecosystems and Communities of EPA's Office of
Policy, Planning and Evaluation is gratefully acknowledged.
Notice

This document has been subjected to U.S. Environmental Protection Agency review and has
been approved for publication. Publication does not signify that the contents necessarily reflect
the views and policies of the Environmental Protection Agency or of any other organization
represented in this document. Mention of trade names does not constitute endorsement or
recommendation for use.
This report should be cited as:

U.S. Environmental Protection Agency. 1997.  Information Management for the Watershed
Approach in the Pacific Northwest.  EPA841-R-97-004. Office of Water (4503F), United States
Environmental Protection Agency, Washington, DC.
To obtain a copy free of charge, contact:

National Center for Environmental Publications and Information (NCEPI)
Phone: (513)489-8190
Fax:  (513)489-8695
This EPA report may also be available on the Internet for browsing or download at:

http://www.epa.gov/OWOW/watershed/wacademy/its.html
                                          IV

-------
                                 TABLE OF CONTENTS
                                                                                    Page

Section 1.      INTRODUCTION AND BACKGROUND	1-1

       1.1     Statewide Watershed Frameworks in EPA Region 10	  -1
       1.2     Common Elements of a Watershed Approach	  -2
       1.3     The Case of Washington State	  -6
       1.4     Project Purpose  	  -7
       1.5     Project Approach	  -8

Section 2.      THE DIVERSITY OF WATERSHED ACTIVITIES IN WASHINGTON STATE ... 2-1

       2.1     Department of Ecology - Water Quality Program	2-2
       2.2     Ecology's Shorelands Water Resources Program: Water Resource Inventory Areas  . . 2-6
       2.3     Washington Watershed Coordination Council  	2-9
       2.4     Ecology Local Action Teams	2-10
       2.5     Watershed Plans under Chapter 400-12 of the Washington Administrative Code  . .  . 2-12
       2.6     Clean Lakes Program	2-13
       2.7     Urban Bay Action Team Plans	2-14
       2.8     Department of Natural Resources Watershed Analysis	2-14
       2.9     Integrated Landscape Management (ILM) for Fish and Wildlife  	2-16
       2.10    Natural Resources Conservation Service Programs	2-18
       2.11    King County Surface Water Management Division  	2-20
       2.12    Citizen Watershed Initiatives:  Save Lake Sammamish	2-21
       2.13    Source Water Protection for Drinking Water Supplies  	2-23
       2.14    Other Programs  	2-24
       2.15    Considerations Based on Watershed Planning in Washington  	2-24

Section 3.      THE WATERSHED INFORMATION CLEARINGHOUSE: A MODEL TO PROMOTE
              COMMUNICATION AND IMPLEMENTATION WITHIN WATERSHEDS	3-1

       3.1     Rationale for Watershed Information Clearinghouses	3-2
       3.2     The Watershed Information Clearinghouse Model 	3-3
       3.2.1    Yakima Watershed Clearinghouse	3-3
       3.2.2    Expansion of the Information Clearinghouse Concept  	3-3
       3.3     Recommendations for Application and Refinement of the Clearinghouse Model  .... 3-6

-------
Section 4.      SPECIFIC PROGRAM DESCRIPTIONS	4-1

       4.1     Endangered Species Act 	4-1
       4.1.1   ESA Section 4: Species Listings and Recovery Plans	4-3
       4.1.2   ESA Section 6: Cooperation with States	4-5
       4.1.3   ESA Section 7: Consultations under ESA  	4-5
       4.1.4   ESA Section 10: An Exception to the Rule	4-7
       4.1.5   ESA Activities Integrated Within the Watershed Approach	4-7
       4.2     Wet Weather Programs 	4-13
       4.2.1   Combined Sewer Overflows  	4-14
       4.2.2   Separate Storm Sewers	4-16
       4.2.3   Sanitary Sewer Overflows	4-18
       4.2.4   Integrating Wet Weather Flow Programs into the Watershed Approach	4-18

Section 5.      DEVELOPING WATERSHED INFORMATION CLEARING HOUSES  	5-1

REFERENCES

APPENDIX A Interview Information Packet

APPENDIX B List of Interviewees

APPENDIX C Integrating Information Managment and Watershed Management Processes
                                        FIGURES
                                                                                      Page

1-1.    Common Elements of a Watershed Approach  	1-5
2-1.    Water Quality Management Areas 	2-3
2-2.    Water Resource Inventory Areas  	2-8
2-3.    Mosaic of Watershed Activities 	2-27
3-1.    Virtual Watershed Atlas  	3-5
                                         TABLES

                                                                                      Page
1 -1.    Status of State Water Quality Program
              Statewide Watershed Approaches in EPA Region 10	1-3
2-1.    Washington State Department of Ecology
              Watershed Approach to Water Quality Management  	2-5
4-1.    Procedures and Policies Used to Implement the Endangered Species Act	4-2

                                             vi

-------
                 SECTION 1. INTRODUCTION AND BACKGROUND
Watershed approaches to managing natural resources have had a remarkable resurgence in the
Pacific Northwest in the last few years. The trend towards an environmental management
system that is community-based and geographically-targeted is likely to continue.  The
watershed approach has great appeal because it incorporates the principles of ecosystem
management, and has been successful in stirring the interest and involvement of citizen
volunteers and agency staff. There remain, however, several significant issues related to
communication and information management that could limit the success of the watershed
approach. This project responds to the need for a method of improved information management
and communication among local, state, federal, and tribal watershed partners.

The Pacific Northwest has proven to be fertile ground for many watershed initiatives. Watershed
groups or associations have been formed by citizens throughout the Pacific Northwest to address
local water quality problems. Coeur d'Alene Lake, Henrys Fork, Lake Sammamish, Nisqually
River, and Tillamook Bay are a few of the locations where citizens have taken the lead seeking
comprehensive solutions to water quality problems.  There are also many other state and federal
watershed initiatives that are occurring, including the Washington State WAC 400-12 process,
Oregon Watershed Councils, and the President's Forest Plan. These are only a few of the many
local, state, tribal and federal watershed initiatives that represent a significant shift in the
management of natural resources in the Pacific Northwest.

The purpose of this project was to evaluate the potential for increasing coordination and
integration among emerging and established watershed partners.  It examines how independent
local, state, tribal and federal groups can continue to use the watershed approach to become more
effective partners on a voluntary basis. The report findings are based on information gathered
from participants involved in a wide range of watershed activities.
1.1    Statewide Watershed Frameworks in EPA Region 10

Water quality programs in the states that comprise EPA Region 10 (Washington, Oregon, Idaho,
and Alaska) have all taken steps to develop and implement statewide watershed frameworks.
The goal of these watershed initiatives is to provide a framework that will integrate the water
quality management activities of local, state, and federal partners. Successfully implemented,
this approach systematically incorporates the principles of watershed management into the daily
operations of water quality programs.  A statewide watershed framework allows those agencies
to better coordinate their support for existing and emerging watershed projects. In some states,
the statewide watershed frameworks of the water quality programs have been designed to
complement the many existing and ongoing watershed activities of other stakeholders.

The state water quality programs started the watershed framework development process without
Information Management for the Watershed Approach in the Pacific Northwest                          1-1

-------
a well defined mandate.  There was not sufficient agreement among stakeholders to enable one
agency or group to lead the development of a statewide watershed framework. Therefore, the
water quality programs were careful to define the limits of their initiatives so that they did not
encroach on other agencies' program areas.

The statewide watershed frameworks were developed by work groups having representatives
from participating programs. The work groups considered a series of topics pertaining to the
elements of a watershed approach. The elements most watershed planning and implementation
processes share in common are detailed in Section 1.2. These common elements include:
stakeholder involvement, geographic management units, statewide cycle, strategic monitoring,
basin/watershed assessment, priority setting and targeting, management strategy development,
watershed plans, and implementation.

These elements were used as design tools by the work groups to help structure the statewide
watershed framework development process. The work group results are compiled into a
framework  document that describes the schedule and procedures for a watershed approach.

The framework developed by each state is tailored to its specific circumstances.  Substantial
differences  exist between states based on the descriptions of their approaches provided in draft or
final framework documents. Alaska, for example, is the only state that used a framework
development work group which included representatives from other agencies, native
corporations, industry associations, and environmental groups. In other states such as
Washington, the agencies focus on more effectively organizing their own activities, and on
increasing the level of public involvement in managing water quality. This internal focus can,
nevertheless, encourage voluntary interagency collaboration. Regardless of differences between
states, each watershed framework is based on  a number of common elements. Table 1-1
summarizes the status of the framework for each Region 10 state water quality program.

1.2    Common Elements  of a Watershed Approach

The elements of a watershed approach described in this section are shared by both the statewide
framework  and individual small scale watershed projects.  The following element summaries
(illustrated  in Figure 1-1) provide the context for further evaluation of watershed
communication and information management needs in Region  10.

 •     water shed management units:  Participating stakeholders adopt geographic management
       units using commonly defined boundaries to provide spatial coordination for
       management activities. Often, ground water aquifers as well as surface waters and their
       watersheds comprise these management units.  The watershed management units must
       include smaller hydrologic units, "nested" units, that integrate activities from the smallest
       project scale to large river basins and ecoregions.
Watershed Academy Information Transfer Series, No. 6                                            1-2

-------
Table 1-1
Information Management for the Watershed Approach in the Pacific Northwest                             1-3

-------
       watershed management cycle: The watershed management cycle provides temporal
       coordination to stakeholder activities and is made up of three components: 1) a series of
       steps for building and implementing Watershed Management Plans; 2) a common
       schedule of activities within these steps; and 3) a sequence for addressing watersheds.
       The cycle is voluntary and can easily accommodate more complex schedules.

       stakeholder involvement:  Stakeholder involvement is an open process that provides
       meaningful roles to all interested parties. A watershed approach should include
       administrative structures and procedures for incorporating a broad range of partners in
       the watershed management planning and implementation cycle.

       strategic monitoring: Strategic monitoring addresses information needs identified by
       stakeholders and supports watershed goals and objectives. This element supports both
       development of specific environmental objectives, indicators, and measures of success
       and implementation of the priority setting feature of the watershed approach.  Strategic
       monitoring and information gathering occur throughout the watershed cycle to support
       decision-making with up-to-date scientific data on watershed condition

       watershed assessment: A comprehensive watershed assessment provides a scientific
       basis for identifying priority issues in the watershed, and for developing management
       strategies.  Program priorities are evaluated relative to watershed conditions. Assessment
       precedes decision-making regarding the implementation of program requirements.

       prioritization and targeting:  This element recognizes that environmental management
       needs will vary from location to location, and that these needs will consistently exceed
       the resources available to address them. This element provides procedures for assigning
       scarce resources more effectively and efficiently. It should be an educational and
       consensus building step that includes all watershed partners.

       developing management strategies: Watershed teams composed of a broad range of
       stakeholders provide the capability to develop comprehensive  solutions to targeted
       watershed issues. The objective in using teams is to encourage collaborative solutions,
       reduce redundancies, integrate the efforts of watershed partners, and increase the number
       of possible resource management options.

       water shed management plans: A Watershed Management Plan (Plan) consolidates
       assessment data, documents decisions on targeted priorities, describes management
       strategies, and presents schedules and agreements for implementing management
       strategies.   The Plan documents the consensus building process, and serves as a guide for
       stewardship, or as an "owner's manual" for watershed stakeholders. If the Plan is
       compiled as the watershed process proceeds, it can serve as a central collection point for
       information, and be used as a resource for developing other communication products.
Watershed Academy Information Transfer Series, No. 6                                            1-4

-------
Fig. 1-1.  Common Elements of A Watershed Approach.

       Watershed Management Plans may also provide a common product for stakeholders that
       fulfills many local, state, and federal requirements.

 •     implementation:  The implementation element focuses the process on practical solutions
       and provides a horizon for planning activities. Watershed Management Plans include
       information describing specific implementation responsibilities, agreements, and
       schedules.

A single element does not stand alone; the activities of any one element are keyed to those of the
others. For example, a Watershed Management Plan cannot be successful in the absence of other
elements.  The Plan is built by and contributes to the other elements.  The Plan is comprised of
accumulated background information that can be used for priority setting and targeting.  The
Watershed Management Plan communicates the information (e.g., schedules, agreements,
technical information) necessary for the implementation actions that directly or indirectly result
in water quality improvements.

Watershed Management Plans may serve many different purposes and fulfill a variety of
requirements. Watershed Management Plans can serve as a common reference document for the
planning and implementation cycle that has been adopted by participating watershed partners.
The status of watershed resources is reported, priority issues are identified, and recommended
management strategies are described.  Agreements between watershed partners that define
Information Management for the Watershed Approach in the Pacific Northwest                          1-5

-------
collaborative activities may also be included in the Plan.  Watershed Management Plans may be
used as a guide for implementing water quality management activities. An example outline of a
Watershed Management Plan is shown in Appendix A.

Many different approaches to watershed planning and Watershed Management Plans are being
developed in states around the country. Experience indicates that Watershed Management Plans
can fulfill a broad range of requirements for agency partners. In some states, Watershed
Management Plans have been useful as a common product for watershed partners, making it less
likely for anyone to "drift" away from the watershed process.
1.3    The Case of Washington State

In 1992, the Washington State Department of Ecology (Ecology) Water Quality Program was
involved in a process to develop a statewide watershed approach.  Its goal was to organize
Ecology's Water Quality Program permitting activities on a geographic basis. The initiative was
viewed as the first phase of a more comprehensive watershed approach, and thus, the scale and
focus of the initial effort included only some of Ecology's water quality activities.

The Water Quality Program identified a list of potential barriers to the watershed approach in
Washington, and requested the assistance of EPA Region 10 in overcoming these barriers.
Ecology and EPA Region 10 staff met in Tacoma to discuss them. At the meeting, the Director
of the Region 10 Water Quality Division made a commitment to help Ecology address the
barriers to the watershed approach.  Several of the problems were resolved at the Tacoma
meeting, and others have been addressed since that time.

Ecology indicated that the numerous individual program reporting requirements  mandated by the
Clean Water Act tied up resources unnecessarily, and redirected the communication emphasis in
remote locations from watershed residents to reporting officials.  Ecology proposed that program
reporting requirements be consolidated into a single watershed report,  similar to  the Watershed
Management Plans.  The primary purpose of this document would be to provide  watershed
assessment data, and information on Ecology's activities to watershed residents and other
stakeholders.

This proposal raised many important questions relating to reporting requirements directly
mandated by the Clean Water Act. Region 10 agreed to review program reporting requirements,
and where possible, allow watershed reports to fulfill  the reporting function.  This project
initiates the consideration process of consolidation of reporting requirements. This pilot analysis
considers information and communication requirements/needs for several programs responsible
for implementing Clean Water Act sections; the analysis also extends beyond Ecology and EPA
and includes the information/communication needs of several other water quality and resource
management stakeholders.
Watershed Academy Information Transfer Series, No. 6                                           1-6

-------
1.4    Project Purpose

U.S. EPA is seeking opportunities to help state and local agencies meet Clean Water Act (CWA)
and Endangered Species Act (ESA) requirements through the watershed approach. Examples of
CWA requirements that can be addressed through the watershed approach include: 303(d) Total
Maximum Daily Loads listing and mitigation strategy requirements; 305(b) water quality
assessment reports; Triennial Standards Review and Update; NPDES permitting and wet weather
programs; Comprehensive State Ground Water Protection Program - Wellhead Protection; and
Nonpoint Source Management Plans. Other region-wide initiatives such as the Salmon Strategy
and the Forest Plan also involve a watershed approach.  In addition,  it may be possible to meet
some of the requirements of the Endangered Species Act using the watershed approach.  This
project examines the feasibility of using the watershed approach to fulfill the goals and meet the
requirements of these acts and programs.

The initial project focus was on the potential for using Watershed Management Plans to better
coordinate the activities of multiple partners. This project responds to Ecology's request for
better understanding how Watershed Management Plans can consolidate a variety of
communication and reporting requirements with one product. Thus, another  objective of the
project is to improve understanding of the use of Watershed Management Plans in the Pacific
Northwest by soliciting information on opportunities for, and barriers to, using Watershed
Management Plans from a variety of agency staff and watershed team participants.

Washington is the Region 10 state selected for a case study in this report. The diverse array of
watershed projects and approaches being implemented in Washington state offers an opportunity
to explore common information needs and efficiency achievable through sharing of information.
The scope of this report provides  for discussion of some of the watershed projects in
Washington.  Watershed approaches and projects in Alaska, Idaho, and Oregon were not within
the scope of this project.

The Washington case study may be useful to Region 10 in determining  how it can promote
opportunities and remove barriers to more effectively use Watershed Management Plans
elsewhere in the region.  The project report may also be useful to others as a reference document
for decision-making relating to the watershed approach.

Section 1 of the report provides background information on the status of the statewide watershed
framework in EPA Region 10 states, and describes the common elements of the watershed
approach, and in particular, Watershed Management Plans.  Section  1 also describes the project
approach.

Section 2 provides brief descriptions of numerous watershed initiatives  and programs in
Washington state, and considers opportunities and barriers to the use of the watershed approach
by these  agencies and groups.  The complexity of information and communication needs that
exist within watersheds is depicted by a mosaic of watershed  activities.  It is the complexity of
Information Management for the Watershed Approach in the Pacific Northwest                          1-7

-------
this mosaic that raises doubts regarding the use of a single Watershed Management Plan to fulfill
all information and communication needs within a watershed.

Section 3 proposes an alternative information management and communication model — termed
here the "watershed information clearinghouse."  This section describes areas of consensus
regarding the use of information clearinghouses in lieu of Watershed Management Plans to serve
as a single product (e.g., assessment report, cooperative management strategy, implementation
guide, accounting report) for watershed planning and implementation initiatives.

Section 4 briefly describes two example program areas and evaluates how the watershed
clearinghouse model could lead to more effective implementation of these programs.

Section 5 presents several recommendations for next steps to take in establishing watershed
information clearinghouses in Washington state that were suggested by project participants in
their interviews.
1.5    Project Approach

To evaluate how Watershed Management Plans can consolidate a variety of communication and
reporting requirements, this pilot analysis solicited information on opportunities for, and barriers
to, using Watershed Management Plans from a variety of agency staff and watershed team
participants. The information and communication needs of various potential watershed partners
resulted in an unanticipated recommendation for a model to address those needs.

Interviews were scheduled with individuals who have had experience in watershed projects or
activities sponsored by the program areas of interest.  The project team attempted to obtain a
balanced sample of interviews representing individuals with local, state, federal, and private
citizen perspectives. One gap in the analysis is the perspective of tribal representatives, an
omission that should be corrected in any future analysis.

Each interview candidate was mailed an interview information packet that contained background
information on project objectives, background information on watershed approaches, and
interview questions. The interview questions were designed to identify the watershed
information needs and products of those interviewed. The interview questions also aimed to
identify the communication requirements and objectives of the programs, agencies, and
volunteer watershed groups that were evaluated. The eight-page packet is included here as
Appendix A.

The project team contacted each interview candidate and confirmed a meeting time and location.
Some interviews were conducted over the telephone.  Most of the personal interviews were
completed during the week of September 9th through 13th in Olympia, Yakima, and Seattle,
(and vicinity) Washington.  Supplemental interviews were completed later in September and in
Watershed Academy Information Transfer Series, No. 6                                           1-8

-------
November. In all, 43 interviews were completed.  The roster of people interviewed is included
as Appendix B.

It is important to note that after the first few interviews, the project team recognized that a single
Watershed Management Plan would not fulfill the information and communication needs of
interview participants. A single Plan was viewed as having too many limitations to fulfill the
needs of all partners. A written document such as a Watershed Management Plan was also
viewed as requiring a level of commitment that was not sustainable by newly developing
partnerships.  In the second day of interviews a different concept emerged — a central
information base that could make essential information available to watershed partners and
facilitate communication and decision-making among partners. When subsequent participants
were presented with this concept, they responded favorably and expanded to meet their needs.
Therefore, the project focus was revised to explore an alternative "watershed information
clearinghouse." The project report reflects this shift in emphasis.

Not all project participants were concerned with the same watershed issues (i.e., The Endangered
Species Act, the multiple Clean Water Act requirements, the Salmon Strategy, the Forest Plan).
However, participants had objectives or needs that could potentially be fulfilled through the use
of watershed approaches. By identifying mutual and overlapping objectives among potential
watershed team members, the project evaluates whether or not watershed partnerships can
sustain a commitment to a common process and product.  Towards this end, the project
interviews aimed to identify participants' information and communication needs (e.g., spatial
scale, technical detail, regulatory versus voluntary).

The project report is a synthesis of the completed interviews as reconstructed from notes written
by the project team and the authors' thoughts. It represents an integration of concepts rather than
any one model currently under development.  There has been no attempt to identify individual
responses. Each interview participant was sent a copy of the draft report for review. Their
comments were included in the final project report.

This report synthesizes interview concepts shared by and between interviewees, to enhance
communication and information element of the watershed approach.  In some states, this element
has been fulfilled through the development of a Watershed Management Plan.  However, the
interviews conducted for this project suggest that a more dynamic forum for promoting
communication and meeting information needs will be necessary for a comprehensive watershed
approach to be successful.
Information Management for the Watershed Approach in the Pacific Northwest                           1-9

-------
In addition to conducting interviews, the project team selected two program areas for extended
analysis (Section 4):

 •     The Endangered Species Act
 •     National Pollutant Discharge Elimination System (NPDES) Wet Weather programs
Watershed Academy Information Transfer Series, No. 6                                            1-10

-------
          SECTION 2.  THE DIVERSITY OF WATERSHED ACTIVITIES IN
                                WASHINGTON STATE

To understand the use of watershed plans or an alternative form of information management and
communication, it is necessary to consider the partners potentially involved in a watershed
approach, and what the partners' needs are.  Section 2 describes a small sample of programs,
projects, and initiatives that represent the rich mix of resource management activities occurring
in Washington watersheds.  The purpose of the interviews described in Section 1.5 was to assess
the possibility of establishing a coordinated and cooperative process for developing a common
watershed document. The interview participants were encouraged to identify opportunities and
barriers to becoming partners in a broadly-defined watershed approach. The programs described
briefly in the following subsections do not encompass all of the geographically-based programs
focused on water quality or quantity protection.  Although not a comprehensive survey, the
program descriptions provide the reader with an impression of the diversity of efforts currently
operating in the state.

Washington state provides an opportunity to evaluate watershed planning from a variety of
perspectives.  The state may be unique in the number and diversity of its geographically-based
environmental protection programs.  Washington serves as an appropriate case study because of
the numerous and diverse programs which exist for the protection of watersheds.  These
programs may have overlapping needs, yet divergent missions and  mandates. In 1993, the
Office of the Governor conducted an inventory of watershed projects by Water Resource
Inventory Area and published the results in a draft report, "Significant Watershed Activity
Survey" (Moody 1993).  The summary tables of the report identify hundreds of watershed
projects sponsored by local, state, and federal agencies, industries,  environmental organizations,
and private non-profit citizen watershed organizations. The report  indicates that there is little or
no coordination among watershed projects within the same hydrologic unit.  It points to the need
for a common information base to improve coordination between projects.

There are also a number of resource management and protection programs in Washington that
are not being implemented through a watershed  approach.  For example, the Natural Resource
Conservation Service farm pond (manure lagoon) program provides important benefits to
watershed health, but the program is not administered as a watershed program.  Although
projects may be located within the same hydrological unit,  or may be nested within the same
regional basin, they do not have common jurisdictional boundaries, limiting their ability to
collaborate. The large number of watershed projects and the Ecology Water Quality Program's
statewide watershed framework provide both opportunities and incentives for non-watershed
programs to become active partners.

Both watershed projects, and resource management and protection  programs that do not
currently use the watershed approach, are responding to the mandates of environmental
legislation such as the Endangered Species Act,  the Clean Water Act, and the Safe Drinking
Water Act. Many of their project and program goals aim to bring watershed activities and
Information Management for the Watershed Approach in the Pacific Northwest                          2-1

-------
resource management into compliance with such acts.  This report looks at how the activities of
diverse watershed and non-watershed groups can be coordinated; it also examines how these
groups can better meet the requirements of environmental legislation with one product and/or
process.  Section 2 focuses on the diversity of activities within the state that could be integrated
into a broad-based watershed approach.  For each program considered, this section presents:

 •     a brief program description that includes the sponsoring agency,  legislative mandate,
       nature of activities, and purpose/product of the program; and

 •     the opportunities and barriers for using the watershed approach.
2.1    Department of Ecology - Water Quality Program

Program Description: In 1992, the Water Quality Program at Ecology established a watershed
approach to geographically coordinate the activities of their permitting teams for National
Pollution Discharge Elimination System (NPDES), the State Water Pollution Control Act
(Chapter 90.48 RCW), and the State Waste Discharge Permitting Program (Chapter 173-216
WAC).  The purpose of the watershed approach is to focus the resources of the Water Quality
Program on specific activities within a watershed in each year of a five-year cycle, thereby
integrating on-going activities within  a basin and more efficiently utilizing resources.

Since that time, the activities of the nonpoint source planning team among others have been
added to the effort. The approach now encompasses most of Ecology's Clean Water Act
planning and implementation activities.  The program divides the state into 23 water quality
management areas (WQMAs) and establishes a schedule for the focus of Water Quality Program
activities in each of the WQMAs. A map of the WQMAs is included in Figure 2-1. Each
WQMA is on a five-year cycle that is organized into four major areas  of activity:

 •     Year 1: SCOPING: Identify and prioritize known and suspected water quality issues
       within the WQMA by assembling input from extensive community involvement and
       internal Ecology staff. Produce a Needs Assessment.

       Year 2/3: DATA COLLECTION/ANALYSIS: Conduct water quality Total Maximum
       Daily Loadings (TMDLs), monitoring, special studies, class II inspections, and general
       research to discern which of the issues identified in the scoping process are problems.

 •     Year 4:  TECHNICAL REPORT: Develop a report in coordination with the community
       that addresses the above problems and other concerns.  Outline strategies and
       management activities needed to:  reissue NPDES and state waste discharge permits,
       form partnerships, and solidify nonpoint partnerships with grants and/or loans.
Watershed Academy Information Transfer Series, No. 6                                           2-2

-------
Fig. 2-1. Water Quality Management Areas (Department of Ecology 1994).
 •     Year 5: IMPLEMENTATION:  Issue or reissue wastewater discharge permits and work
       with local programs and partners to implement nonpoint pollution prevention and control
       activities that respond to priority water quality problems.
Information Management for the Watershed Approach in the Pacific Northwest                          2-3

-------
The schedule for sequencing WQMAs into the watershed cycle is provided in Table 2-1.

Opportunities and Barriers Within the Watershed Approach:

 •     Ecology explicitly limited the scope of its statewide watershed approach to its Water
       Quality Program alone. Several factors contributed to this decision:

       1)    The Water Quality Program was operating on a mandate that did not extend
             beyond their own program boundaries.  The Water Quality Program was also
             aware of other watershed initiatives and projects, and was concerned  about
             perceptions that the statewide approach was competing or seeking to  supplant
             these efforts. Instead, the Water Quality Program was looking for a systematic
             way to complement ongoing efforts.

       2)    The statewide watershed approach design process was truncated by a court-
             imposed deadline for implementation of the watershed approach. The deadline
             restricted the time period for conducting outreach and coordinating with other
             potential watershed partners.

       3)    The Water Quality Program does not have the mandate or resources to maintain
             organizational support in all of the areas that have been targeted for water quality
             management support.  Successful  watershed initiatives must have some basis in
             the community. Ecology is prepared to serve as a catalyst for initiating watershed
             partnerships, especially during Year 1 (Scoping) of the process. However, local
             sponsorship and participation must emerge quickly to support and sustain
             watershed projects through the remaining years of the cycle.

       4)    Ecology has sustained significant  reductions in its budget in the past few years
             and is anticipating further budget reductions. Consequently, Ecology
             management is cautious about raising expectations that it can support the
             statewide watershed framework infrastructure for other partners in  the face of
             declining resources.  Promotion of a more inclusive watershed approach with
             enhanced communication  and information management requirements cannot be
             supported by Ecology's current budget.  Additional sources of funding will have
             to be identified to take the next step in improving the coordination  of activities
             within watersheds.
Watershed Academy Information Transfer Series, No. 6                                            2-4

-------
Table 2-1.  Washington State Department of Ecology Watershed Approach to
         Water Quality Management.

 •     The 303(d) list of water quality limited waters and the associated Total Maximum Daily
       Load (TMDL) process have provided both great opportunities and significant barriers to
       the watershed approach. Court orders often limit the flexibility of the state in developing
       TMDLs on a schedule that may be inconsistent with the WQMA sequence. In addition,
       there has been no common understanding between EPA Region  10 and Ecology
Information Management for the Watershed Approach in the Pacific Northwest                          2-5

-------
       regarding the acceptability of alternative formats for TMDLs that are consistent with the
       watershed approach.

 •     Ecology is developing guidance for Nonpoint Source TMDLs as part of its efforts to
       incorporate the nonpoint program into the watershed approach.  The draft guidance
       proposes that a nonpoint source TMDL would involve developing mutually agreeable
       (i.e., voluntary) solutions by local land managers and owners. This will increase the need
       for communication tools within the watershed that differ from a standard point source
       TMDL approach.

Despite the concerns and barriers listed above, the consensus-developed WQMA framework
supports improved communication and information management.  Ecology conducts monitoring
and assessment activities statewide and maintains the largest water quality databases in the  state.
The Ecology watershed approach will provide the type of long-term involvement required to
track baseline conditions in the WQMAs. Individual projects may shift around within the
watershed mosaic, but Ecology will continue to use the WQMA as the base unit for organizing
its activities.

2.2    Ecology's Shorelands and Water Resources Program: Water Resource Inventory
       Areas

Program Description: Ecology's Shorelands and Water Resources Program is responsible for
surface and groundwater allocation. The surface water allocation  program commenced in 1917
with the legislative enactment of Chapter 90.03 of the Revised Code of Washington (RCW).
The groundwater allocation program was enacted in 1945 as Chapter 90.44 RCW.  Legislation
developed in 1971 (Chapter 90.54 RCW) mandated that the state be divided into 62 watersheds,
termed Water Resource Inventory Areas (WRIAs).  The 62 WRIAs identified in Chapter 173-
500 of the Washington Administrative Code (WAC) are illustrated in Figure 2-2. The Water
Quality Management Areas used by the Water Quality Program are composed of WRIAs that
have been aggregated into larger basin units.

Recommended instream flows for many of Washington's rivers have been established by
administrative rule; the first were established in 1976. When evaluating new applications for
water rights, Ecology must consider the following four criteria:

       Is the proposed use of the water considered a beneficial use?
       Is water available?
       Will any senior water rights be impaired by this use (including instream flows which are
       considered senior rights)?
       Is the activity non-detrimental to the public interest?

Ecology seeks to balance the need to maintain senior water rights  and instream flows that will
support salmonid passage and fish spawning habitat with the need to accommodate new
Watershed Academy Information Transfer Series, No. 6                                           2-6

-------
applicants. After reviewing each new water rights application, Ecology produces a "Report of
Examination" which relates their findings and may or may not grant a water right.

In 1990, the Chelan Agreement was developed as a cooperative response to historic water
resource conflicts in Washington. The agreement, which was developed by a diverse assemblage
of water resource stakeholders, emphasizes cooperative water resource planning on a regional
(WRIA) basis. Planning is intended to be a consensus process, circumventing the need for
administrative, legislative, or judicial intervention.

Two watersheds which had been previously recommended by the legislature for regional water
resources planning — the Methow and the Dungeness-Quilcene — were funded as pilot
watersheds to develop plans using the Chelan Agreement process. In each area, an initial
meeting of affected representatives was convened to identify stakeholders, identify the issues of
concern, define watershed boundaries, establish a time  frame for implementing the process, and
designate a coordinating entity.  The potential for coordination with other related planning
activities such as water quality, land use planning, and  permitting was also to be considered.
Plans in the two  pilot watersheds are being developed using the consensus process.

Opportunities and Barriers Within  the Watershed Approach:

 •     Ecology has begun to evaluate new water rights applications within a watershed  context
       by assessing such questions as, what are the other existing uses, the levels of use, and the
       potential  impacts on water quality, does adequate data exist on which to base decisions, if
       not what specific data gaps  exist. Therefore, this program has an increasing need for
       comprehensive watershed information.

 •      There are several ties to the Water Quality Program. For example:

       4     the Jefferson County Public Utility District #1 versus the Washington State
             Department of Ecology (Elkhorn Case) decision establishes that flow is a
             component of water quality;
       4     water rights data and associated information are stored electronically;
       4     water reuse, reclamation, and conjunctive use information and decisions are
             closely aligned with nonpoint source program objectives; and
       4     flow augmentation and water reuse have a direct relevance to Water Quality
             Program decisions.
Information Management for the Watershed Approach in the Pacific Northwest                          2-7

-------
Fig. 2-2. Water Resource Inventory Areas.
 •     The watershed approach is useful for examining ground water/surface water interactions,
Watershed Academy Information Transfer Series, No. 6                                              2-8

-------
       especially in large basins where there is good correlation between aquifers and surface
       hydrological units.

       Ground water and surface water data acquired from other sources by Water Resources
       (and any associated analysis) is useful information to the Water Quality Program
       watershed approach teams (e.g., United States Geological Survey database - 80,000
       wells, U.S. Bureau of Reclamation).

       The Chelan Agreement, which established a consensus-based process for planning water
       resources management within WRIAs, is consistent with the watershed process. Thus
       there are areas where collaboration would make sense.

       Assessment of development trends within the WRIA provides valuable background
       information for evaluating water rights application.

       Water rights are viewed as property rights, which can make collaboration controversial
       and difficult in certain regions of the state.

       The statutory mandates which require Ecology to balance protection of the resource
       while permitting appropriate development create barriers to cooperation when using a
       watershed approach.
2.3    Washington Watershed Coordination Council

Program Description: The Washington Watershed Coordination Council (WWCC) was
established to coordinate and integrate the watershed activities often participating state agencies.
It provides a forum whereby state agencies can coordinate their activities in a watershed area
including watershed planning.  It is intended that the WWCC activities complement and support
those of local governments. It is not intended to take over or lead local watershed activities.  In
this light, it supports locally-driven watershed  planning and implementation efforts that protect
and restore watershed health (WWCC  1996).  Improving coordination and communication
among state agencies will serve the stated purpose of enhancing the delivery of services to the
watershed. The goal  of the program is to improve inter-agency coordination, and external
communication through  the use of a state agency committee.

Four pilot watersheds have been identified to implement the principals of the WWCC. Lead
agencies have been identified for each of these watershed as follows:

 •     Nooksack - Ecology
 •     Yakima - Ecology
 •     Snohomish - Puget Sound Water Quality Action Team
 •     Chehalis - Ecology.
Information Management for the Watershed Approach in the Pacific Northwest                          2-9

-------
For each watershed, the lead state agency represents a single point of contact for the watershed.
The watershed lead helps direct questions from within the watershed to the appropriate
individual within each agency, and ensures that follow-up occurs (WWCC 1996).  Supporting
state agencies designate a single reference person from among their staff who the watershed lead
contacts when issues and questions arise in that watershed. One purpose of the WWCC is to
create an environment where the planning or implementation efforts of individual agencies are
coordinated and do not conflict within a watershed.

Opportunities and Barriers Within the Watershed Approach:

 •      The WWCC provides an opportunity to discuss priorities and coordinate activities among
       the participating agencies. It also serves as a central point for facilitating information
       exchange.

 •     The WWCC represents the constituencies of its agencies.  Coordination and facilitation
       efforts must balance the needs of all interests in providing services to local communities
       within the watershed.

 •     The WWCC includes only two federal agency counterparts (EPA and the USFS) to the
       participating state agencies.  These federal members are advisory and participatory
       members of the WWCC. Other federal program activities do not benefit from the
       coordinative efforts that enhance delivery of services to the local watersheds.

2.4    Ecology Local Action Teams

The Department of Ecology has initiated the formation of local action teams (LATs).  These
interdisciplinary (cross-programmatic) teams address environmental issues within a specific
watershed. As with the WWCC, Ecology designates a single point of contact to help direct
questions that arise within the local area.  One  of the LATs' primary goals is to involve the
community in identification of environmental issues and their solutions. In accomplishing this
purpose, the LAT leader encourages  partnerships to be formed among local governments, tribes,
citizen groups, and interested parties.

Four pilot LATs have been formed, three within the last year.  The LATs do not necessarily
share the same boundaries as WQMAs; some, such as the Chehalis LAT, are nested within
WQMAs.  The four existing LATs are:

 •     Nooksack
 •     Yakima
 •     Snohomish
 •     Chehalis.

Although the LATs coincide with the four watersheds designated at the state level to implement
Watershed Academy Information Transfer Series, No. 6                                           2-10

-------
the WWCC process, the LAT leader may or may not be the WWCC lead agency contact.  The
focus of the LATs is to coordinate activities under Ecology's mandates within the basins.

LATs are proactive in planning and consolidating environmental actions within the watershed.
The LATs coordinate Ecology's internal resources, as well as focus community resources, that
will optimize resource utilization in implementing environmental solutions.  For instance, the
Yakima LAT serves an important role in building coalitions of stakeholders to implement water
quality improvements with respect to the TMDL. The Yakima LAT also serves to educate a
variety of local audiences about the  TMDL.

While the LAT team leader is anew position within Ecology, the members of the LAT work for
the various Ecology programs.  As such, they are responsible for conducting the core business of
Ecology in that area.  Before a LAT is approved, a profile document is prepared. From this
profile, Ecology management concurs with the activities for which the LAT will be responsible.
It is important to note that both state and local priorities are addressed by the LAT.

Opportunities and Barriers Within the Watershed Approach:

 •     The Local Action  Teams represent several  constituencies within Ecology in addition to
       the Water Quality  Program.  Their coordination and facilitation efforts must balance the
       interests of all programs in providing services to local communities within the watershed.
       For example, a local community may not be interested in using the services of the LAT  to
       address a TMDL, but could be in crisis mode regarding flood management assistance.

 •      LAT leaders provide a central point of contact for exchanging information and
       coordinating Ecology activities and priorities within the LAT.

 •     The function of the LATs is  to coordinate existing leadership, not authority or resources.
       Therefore, they  must rely on winning the commitment of others to be effective.

 •     LAT boundaries may not coincide with those of the WQMAs. Therefore, it could be
       difficult for LATs to respond to shifting priorities within the WQMA.

 •     A logical outgrowth of LATs could be the establishment of Field Offices to carry out
       selected business of Ecology in that area. The initiating premise is that Ecology needs to
       offer services as near as possible to the area obtaining the service. LATs are the first step
       in accomplishing that premise.
2.5    Watershed Plans under Chapter 400-12 of the Washington Administrative Code

Program Description: The 1987 Puget Sound Water Quality Management Plan created the
Puget Sound local watershed action program (PSWQA 1987).  The program is one of the
Information Management for the Watershed Approach in the Pacific Northwest                         2-11

-------
primary means by which local communities manage and prevent nonpoint source pollution.
Each of the 12 counties surrounding Puget Sound ranked their watersheds in 1988 according to a
set of criteria based on scientific and institutional factors, resulting in a total of 119 ranked
watersheds.  Watersheds range in size from huge river systems, to clusters of smaller watersheds,
to small tributaries.  Currently, 30 plans are being implemented in ten of the Puget Sound
counties, and 41 committees either have or are developing new watershed plans.

After obtaining funding (generally through the state Centennial Clean Water Fund [CCWF]),
local officials appoint a community-based watershed management committee that includes
representatives of county government, conservation districts, tribes, businesses, citizens, and
special interest groups.  For each watershed, the committee leads the planning effort through the
following phases: 1) identification and characterization of goals,  objectives, and problems; 2)
development of solutions for each problem; 3) preparation for implementation, and public
involvement; 4) agreement of implementing entities; 5) review of selected watershed priorities
by involved agencies, the public, and Ecology; and 6) approval of the watershed plan by
Ecology.

This program requires local ("grass roots") participation in developing watershed plans,
including a strategy to involve and educate the public in all parts of the watershed.
Opportunities for public participation exist through the watershed management committees,
during and after the planning process, in the form of watershed tours, or through workshops,
streamwalks, cleanups, volunteer monitoring, and other activities.

Opportunities and Barriers Within the Watershed Approach:

The WAC 400-12 watershed management committees provide an effective forum for negotiating
consensus priorities within their watersheds. However, the WAC 400-12 process has some
issues that must be addressed before it achieves its full potential.

  •    There is a perception that WAC 400-12 watershed management committee
       recommendations have not received adequate consideration from Ecology as funded
       project priorities. The interviews suggest several possible reasons for this perception:

       4      The watershed management committees have identified far more priorities than
             there is available funding for.

       4      The funding mechanisms available are not designed to provide consistent and on-
             going support to implement the recommendations of the watershed committees.

       4      The Legislature requires that  80% of the CCWF money be directed to facilities,
              and 20% to planning and nonpoint source activities.  This creates an imbalance
             because the watershed management committee recommendations are exclusively
             nonpoint.
Watershed Academy Information Transfer Series, No. 6                                           2-12

-------
              An agency that is not part of the 400-12 watershed priority review process may
              undertake a project that was not on the WAC 400-12 list.

              There is a perception that WQMA sequence may cause Ecology implementation
              resources to be focused elsewhere in the state. This may not coincide with the
              timing of the WAC 400-12 watershed management committee recommendations.
              Ecology is aware of this perception and is working toward meeting local request
              for implementation funding regardless of the WQMA schedule.
2.6    Clean Lakes Program

Program Description: The Clean Lakes Program is enabled by Section 314 of the Clean Water
Act and is administered by the Water Quality Program of Ecology.  This grant-funded program
provides for three types of projects, all of which are nested within larger WQMAs.  Each phase
requires local government and citizen lake advisory committee support. This local involvement
comes from citizens in the immediate watershed of the lake, and frequently lakefront property
owners.

During Phase I, Diagnostic/Feasibility Assessments, funding is provided for in-lake and upland
data collection. Physical, chemical, and biological  parameters are collected; data are evaluated.
With citizen input, a management plan is developed for implementation of Phase II. Phase II
grants, Design and Implementation, fund a range of lake improvement activities and structural or
mechanical solutions which will directly benefit lake water quality.  Phase II Implementation
projects may also be funded through the CCWF grants. Phase III, Post-Restoration Monitoring,
provides funding for lake water quality monitoring  for a minimum of five years following
implementation of Phase II activities. The purpose of the Phase III projects is to determine
whether long-term improvements have been realized.

Opportunities and Barriers Within the Watershed Approach:

 •     Clean Lakes Program grant requests often focus on mitigating a symptom within the lake,
       rather than on addressing the source of the problem within the watershed. Consequently,
       lake managers focus on solving problems that are located within the confines of the lake,
       instead of within the boundaries of its watershed.

 •     Lake associations are frequently not included in the larger watershed planning efforts at
       the state level.  Thus, the monitoring and lake restoration efforts are not recognized by
       other watershed partners.

 •     Prior to 1990, the Centennial Clean Water Fund supported five or six local projects each
       year. However, funding has diminished over the past six years.
Information Management for the Watershed Approach in the Pacific Northwest                        2-13

-------
2.7    Urban Bay Action Teams

Urban Bay Action Teams (UBATs) were created as an element of the Puget Sound Water
Quality Management Plan (Plan) in 1987, and funded by EPA. The Plan recommended that
Ecology use these teams to focus state resources for toxic pollutant source reduction, and
contaminated sediment site remediation, in highly urbanized areas located at the mouths of major
rivers on Puget Sound.  Since 1987, UBATs have been established in Bellingham Bay, Elliott
Bay, Commencement Bay, Sinclair Inlet, and Budd Bay. The team leaders have established
working coalitions with representatives of cities,  counties, tribes, industries, and citizen and
interest groups to implement projects for source control, site remediation, and in some instances,
habitat restoration.

Opportunities and Barriers Within the Watershed Approach:

 •     The Urban Bay Action Teams have had considerable success in cultivating partnerships
       within their geographic boundaries, collecting information, and advancing negotiations to
       implement source controls.

 •     The UBATs have had some difficulty coordinating with "upriver" partners, which has
       resulted in some disconnects between mitigation priorities.

 •     UBATs could use an information clearinghouse as a forum for  negotiating more
       substantive watershed partnerships.  The Nooksack was recommended as an ideal
       candidate for pilot demonstration of an information clearinghouse that would facilitate
       further progress with existing partnerships. These partners are  ready to commit to a
       common  process and product, but the information and communication support needs to
       be improved.

2.8    Department of Natural Resources Watershed Analysis

Program Description: Watershed  analysis is the  biological and physical assessment of a
watershed to evaluate the cumulative effects of forestry practices on public resources (including
fish and water).  A process for watershed analysis was developed by forest landowners, tribes,
environmental groups, and state natural resource  agencies, and became required by law in 1992
(DNR 1995). A  watershed analysis is performed on the basis of Watershed Administrative Units
(WAUs) which are defined by hydrologic and geomorphologic characteristics.  There are
approximately 800 WAUs in Washington state, which range in size from 10,000 to 50,000 acres
(DNR 1995). The Department of Natural Resources (DNR) in consultation with cooperators
from the Timber, Fish and Wildlife Process, has prioritized WAUs for analysis based on the
following factors:

 •     Slope stability
 •     Hydrology
Watershed Academy Information Transfer Series, No. 6                                          2-14

-------
 •     Fisheries
 •     Likelihood of forest practices occurring in the near future.

DNR or landowners who own more than 10% of the land in a WAU may conduct a watershed
analysis. Each analysis is conducted by a team of experts from the relevant scientific disciplines.
Each team member is required to meet minimum qualifications, and must be trained in the
watershed analysis process. The analysis includes an evaluation of watershed processes (mass
wasting, surface erosion, hydrology, and riparian function) and an assessment of public
resources (fish habitat, water quality and supply, and public capital improvements such as roads
and reservoirs) (WFPB 1995).  Once the analysis is complete, the experts develop
"prescriptions" (mandatory and recommended forest practices) for the WAU. These
prescriptions become requirements for forest practices applications approved by DNR.

Watershed analyses in approximately 70 WAUs have been completed by DNR and private teams
since the inception of the program in 1992, at an approximate cost of $100,000 each. Much of
the data gathered has been digitized for use on the Geographic Information System (GIS);
however, many of the reports are stored in hard copy only in the regional offices of DNR. DNR
anticipates that all forest practices applications (including watershed analyses) will be posted on
the Internet within the next six to eight months.

Barriers and Opportunities Within the  Watershed Approach:

 •     Watershed analysis can provide essential information to a watershed team for assessment,
       priority setting, and developing management strategies. With sufficient coordination,
       watershed analyses can complement the strategic monitoring component of the statewide
       process.

 •     Watershed analysis often depends on land owners or  land managers to supply
       information. If this information is to be used  aggressively to list waters for the 303(d)
       process (water quality impaired), they may be reluctant to share data.  This barrier could
       be addressed by using the information to raise the priority of a location for mitigation,
       without going to the formal 303(d) listing process.

 •     The watershed analysis is limited to forested lands in the state, and does not include other
       agricultural or heavily urbanized areas.

 •     Current staff and funding levels allow 6 to 8 WAUs (10,00 to  50,000 acre hydrological
       units) to be completed a year.

 •     DNR could use information from other watershed partners in the prescription phase to
       help understand the context of cumulative effects within adjacent or surrounding
       hydrological units.
Information Management for the Watershed Approach in the Pacific Northwest                         2-15

-------
2.9    Integrated Landscape Management (ILM) for Fish and Wildlife

Program Description:   The Integrated Landscape Management (ILM) approach was initiated
by the Washington Department of Wildlife (now called the Washington Department of Fish and
Wildlife, WDFW) in late 1992. In June 1993, the Lewis-Kalama River watershed in southwest
Washington was selected as a pilot project for testing this new approach. This area was selected
because of the diversity in species, multitude of landowners, willingness of the agency staff and
the need for plans to address future hydro-electric relicensing efforts, forest practices
development, mining, and farming.  This new planning process moves away from species-by-
species to a broader landscape or ecosystem based approach.  ILM is a voluntary, non-regulatory
approach to managing fish and wildlife through partnerships between WDFW and landowners.
The ILM planning process is currently the only statewide approach that addresses fish and
wildlife management at the landscape or ecosystem level on the state's 43 million acres. The
goals are to:

•      Work with the public and landowners to prepare, implement and evaluate management
       plans for fish, wildlife and their habitats at the landscape level with clear ties to WDFW
       work plans, budgets, goals and objectives; and

•      Implement this process as WDFW's standard method for managing fish and wildlife.

An integrated process is used to:

•      Work cooperatively with the landowners, publics, and government agencies to identify
       goals and objectives for managing fish and wildlife habitats and species;

•      Focus the expertise and contributions of individual employees across divisions and
       programs to achieve common objectives; and

•      Bring together all fish and wildlife related data occurring on the same landscape.

Goals and objectives developed by the public, agencies, and the Citizens' Advisory Group
(CAG) are used to identify the desired future conditions for fish and wildlife at the watershed
level. GIS and remote sensing technology are used to illustrate the current condition offish and
wildlife habitat and what habitat conditions current land management will create in the future.

When planned land management practices will not meet common goals, voluntary agreements
are developed with landowners that will. This is done by working with landowners
cooperatively to  develop incentives for them to implement positive activities for fish and
wildlife. WDFW assists landowners in developing Habitat Conservation Plans (HCP), Forest
Incentive Programs, Stewardship Programs, all of which foster  a no surprises working
environment.
Watershed Academy Information Transfer Series, No. 6                                          2-16

-------
The public is involved and includes landowners, users, interest groups, tribes, and local, state
and federal agencies. The public participates in focus groups, public meetings, open houses, a
citizens' advisory group, questionnaires, and implementation of the plan.

Watershed boundaries are set by the Washington Department of Ecology for 62 water resource
inventory areas (WRIA).  The 839,010 acre Lewis-Kalama River pilot area is WRIA #27.  This
unit is common to other plans for water, flora, and earth resources making it easy to coordinate
with other landowners and agencies. Integrated Landscape Management will eventually apply to
all 43 million acres in the state.

The final product is a watershed plan which will be used to protect and recover threatened and
endangered species and provide wildlife viewing, fishing, and hunting opportunities. The 11
species plans, four habitat plans and one recreation plan are the building blocks of the overall
watershed plan. For the Lewis-Kalama River watershed, the final plan will be one document
with GIS-based maps illustrating areas, time schedules and options for making changes in the
structure and composition offish and wildlife habitat. It will describe the WDFW's priorities for
allocating staff across programs and divisions to achieve fish and wildlife objectives.

Integrated Landscape Management is coordinated with all other natural resources planning
activities in the state. Other projects are being conducted in the Lewis-Kalama watershed by the
US Forest Service, Clark and Cowlitz County Conservation Districts, and Clark County Public
Services. Major landowners include Gifford Pinchot National Forest, Weyerhaeuser,
International Paper, Longview Fibre, Plum Creek Timber Company and Department of Natural
Resources.

On September 14, 1995, the draft ILM plan, "An Integrated Plan for Managing Fish and
Wildlife...Pilot Project in  the Lewis-Kalama River Watershed, WRIA #27" was published and
distributed.  On June 17, 1996, a companion document, known as Volume II to the watershed
plan was published which summarizes the process used to develop the pilot project to include
what worked, what did not work and recommendations for improving the planning process.

Opportunities and Barriers Within the  Watershed Approach:

•      Direct and active support by WDFW's Director and Management Team are essential to
       getting the ILM approach accepted by all employees.

•      The CAG is essential to gaining public support for ILM and getting landowners to
       cooperate in voluntarily changing some land use practices to achieve long range fish and
       wildlife objectives.

•      ILM will be used to address watershed planning demands placed on the agency from the
       Governor's Office, the tribes, local governments, other agencies and citizen groups.
Information Management for the Watershed Approach in the Pacific Northwest                         2-17

-------
•      ILM will be used to enhance the agency's GIS capabilities and coordination. This
       includes filling data gaps (such as digitized database for stream and riparian habitat),
       integrating known data for estuarine areas, and incorporating data as it becomes available
       through Habitat Conservation Plans and other watershed planning.

•      ILM necessitates the development of statewide species and habitat goals and objectives.
       This subject is currently under discussion by the Timber/Fish/Wildlife policy committee.
       Such goals and objectives become the foundation for integrated landscape management
       planning in HCPs or watershed planning.

•      WDFW will develop an ILM operations manual outlining specific guidelines and tactics
       to consider when a project manager leads an ILM process.  Such leadership could result
       in a watershed identified as a priority by the Governor's Watershed Coordinating
       Council.

WDFW staff from Olympia and Vancouver are currently developing actions that will achieve
multiple benefits for habitats and species  objectives not met in the "hot spot" areas by the year
2014.  The action plan will be used WDFW to start negotiations with willing landowners to
discuss voluntary agreements for meeting the objectives.

Discussions are currently taking place with other state agencies to identify opportunities for
joining efforts to maximize efficiencies, resource benefits, and cost savings in watershed
planning.
2.10   Natural Resources Conservation Service Programs

Program Description:  In recent years the Natural Resource Conservation Service (NRCS)
(formerly the Soil Conservation Service) has developed national initiatives that focus on natural
resource protection from an ecosystem perspective (SCS, 1992a).  National Initiative Three, to
"provide ecosystem-based assistance to our customers for the integrated management needed to
sustain natural resources," includes the following supporting goals:

 •     Strengthen organizational attitudes, structures, and processes to support ecosystem-based
       assistance.

 •     Provide leadership for developing policies, regulations, and legislation that promote an
       ecosystem approach.

 •     Identify indicators that can be used to measure the results of conservation systems and
       programs in terms of ecosystem health.

 •     Develop and implement comprehensive education and marketing strategies for
Watershed Academy Information Transfer Series, No. 6                                           2-18

-------
       ecosystem-based assistance.

In Washington, NRCS provides assistance at two levels.  First, NRCS technical staff work with
individual landowners to ensure that their landuse practices do not adversely affect the
environment, including water quality.  This may take a number of forms, for example:
education, assistance in designing manure lagoons to prevent surface water contamination, and
fencing to prevent cattle from having direct access to streams. NRCS staff may work with
Ecology staff to identify landowners who have the most severe water quality impacts.  NRCS
staff may also work with local watershed groups to assist them in developing management
practices for reducing nonpoint pollution to be recommended in watershed plans.

Second, under the Watershed Protection and Flood Prevention Act (Public Law 566), state
conservationists from the NRCS provide technical and financial aid to local  organizations for
planning and carrying out watershed projects (SCS, 1992b).  These projects  can include:

 •     Flood prevention
 •     Water quality improvement
 •     Agricultural water management
 •     Water-based recreation
 •     Municipal and industrial water supplies
 •     Fish and wildlife development.

Local organizations may make application for financial aid to develop a watershed plan-
environmental impact statement for their project. Such plans are required to address:

 •     Problems
 •     How, when, and by whom the proposed measures will be installed
 •     Environmental effects
 •     Methods of financing.

After a thorough review by NRCS staff, the local organization and NRCS sign a watershed
agreement. The project may then be funded through a cost-sharing agreement.

The watershed projects are locally focused in areas smaller than WQMAs and WRIAs. The
projects are built upon long-term trust between NRCS staff, local landowners and organizations.

Opportunities and Barriers  Within the Watershed Approach:

 •     NRCS currently uses Ecology assessment data on an incidental basis for locating and
       designing conservation projects [i.e., farm ponds (manure lagoons)].  A stronger
       watershed partnership would help NRCS focus their outreach efforts to landowners on
       priority water quality mitigation areas.
Information Management for the Watershed Approach in the Pacific Northwest                         2-19

-------
 •     In a broad-based watershed partnership, NRCS would provide substantial technical
       assistance, expertise in working with landowners, and cost share funding that would
       significantly enhance the resource protection options of water quality programs.

 •     NRCS cautioned that targeting must fall short of "red dotting" individual landowners as
       specific sources of significant nonpoint source pollution.

2.11   King County Surface Water Management Division

Program Description: The King County Surface Water Management Division provides
technical and staff support to four watershed forums in the county. The programs are based on a
17-year history of cooperation among elected officials from four cities in King County who have
jointly developed inter-jurisdictional solutions to flooding and drainage problems.

In 1995, the King County Council created and funded the Green/Duwamish Watershed Forum, a
new alliance of elected officials from 12 local governments in the Green and Duwamish
watersheds.  The Forum's task is to address and resolve water resource problems that cross local
boundaries,  such as water pollution, flooding, and loss of stream habitat. The Forum allows
local officials to establish common priorities and pool resources.

Three other  Watershed Forums have been established in King County, most of which are nested
in the Cedar/Green WQMA of the Ecology Water Quality Program.  Each forum is staffed by the
King County Surface Water Management Division, and has the following responsibilities:

 •     Convene elected officials and other decision-makers to identify concerns, establish
       priorities, and initiate solutions to watershed issues and problems.

 •     Support compatible actions undertaken by cities and other entities within the watershed.

 •     Conduct specific technical analyses to resolve watershed policy issues.

 •     Provide stewardship and public education activities.

 •     Improve access to information, expertise, and other resources for watershed citizens,
       organizations, and public officials.

 •     Guide the Surface Water Management Division and other county capital projects,
       programs, and other implementation actions within the watershed.

The METRO Water Pollution Control programs have also been consolidated with the King
County Surface Water Management Division.  This merger adds many NPDES functions for the
Seattle metropolitan region wastewater treatment, and control of pollution from wet weather
flows.  As a result, a number of programs that address many of the significant stressors existing
Watershed Academy Information Transfer Series, No. 6                                          2-20

-------
within one watershed have been brought together within one organization.

Opportunities and Barriers Within the Watershed Approach:

 •     The consolidation of water quality programs, and the use of hydrological units, will allow
       King County to use assessment data to prioritize their available water quality dollars in
       order to implement the optimal management strategy for watershed health. The county
       will have improved capability to rank water quality risks in an effort to target the most
       cost-effective project objectives. A comprehensive analysis of point source controls, wet
       weather BMPs, CSO infrastructure, landuse options, and physical habitat restoration can
       be considered within the watershed context.

 •     King County Surface Water Management will be able to more effectively represent water
       quality interests to elected officials and community leaders through established watershed
       forums.

 •     The involvement of elected officials early in the planning process provides agencies with
       a clearer assessment of potential implementation problems prior to committing a high
       level of resources to a particular solution. The difficulty of involving local elected
       officials is that they can be strongly risk averse to mitigation programs that require a
       commitment of local resources, or that adversely impact development plans.

 •     The consideration of zoning and landuse is a welcome component in evaluating the long-
       term effectiveness of a mitigation strategy relative to the potential impact of anticipated
       development.

 •     Using hydrological units that cross jurisdictional boundaries facilitates assessment and
       negotiations between upstream and downstream participants.

2.12   Citizen Watershed Initiatives:  Save Lake Sammamish

Program Description:  Citizen sponsored initiatives by definition and necessity have a diverse
set of goals, structures, modes of operation, and products.  It is not possible to choose one
example that characterizes this set of watershed partners; however, it is important to represent
them.  Save Lake Sammamish is a citizen-initiated organization. Its charter mission is to serve
as representative for the lake and to protect the lake from further degradation.  The citizens who
founded Save Lake Sammamish were struck by the lack of coordination  among agencies within
the watershed, and the frequency with which they worked at cross purposes. The goal of the
organization is to better coordinate and integrate the activities of various agencies working
within the Lake Sammamish watershed. Board members are encouraged to serve on other
resource management boards to provide further the cross-fertilization necessary for collaborative
projects. Rather than focusing solely on mitigation objectives, the organization envisions an
increased emphasis on pollution prevention and preservation of watershed resources.
Information Management for the Watershed Approach in the Pacific Northwest                          2-21

-------
It is important to briefly note two other citizen initiatives that have taken a form different from
that of a resident watershed committee.

Citizens helped to sponsor an Open Space bond in King County that had a provision for
establishing a Citizens Oversight Committee. This committee has legislative oversight for the
expenditures made under the $117 million bond.  The oversight committee established a
partnership with King County to form "Waterways 2000", which identifies open space objectives
that will provide protection to King County waterways.  These waterways will be preserved
through purchase or easement.  Waterways 2000 includes representatives from the Surface Water
Management program and Parks and Recreation who work with citizen representatives.  The
passage of the bond gave citizens real authority in developing and directing agency partnerships.

The Mountains to Sound Greenway Trust (Trust) is a citizen-initiated public/private partnership
which aims to establish a corridor that provides a green space connection from the Cascade
Mountains to Puget Sound. To accomplish this objective the Trust has established a series of
agreements between local agencies, the Washington State Department of Natural Resources, the
U.S. Forest Service, and private corporations.  The Trust maintains an inclusive board that has
representatives  from both the public and private sectors. The corridor currently includes  120
miles of greenway.

Opportunities and Barriers Within the Watershed Approach:

 •     Organizations that include private citizens and local agencies can build zoning and
       landuse into their mission more effectively. Landuse is the key to long-term protection of
       water resources in a watershed approach.

 •     Involvement of citizens can be an effective catalyst for agencies in overcoming "turf1
       issues, because there is an incentive not to block implementation.

 •     Citizen committees without funding authority do not have significant leverage in creating
       partnerships with state and federal agencies.
Watershed Academy Information Transfer Series, No. 6                                           2-22

-------
 •     Public agencies may be reluctant to accept and use monitoring data collected by
       volunteers. An information clearinghouse would provide the opportunity for agencies to
       compare volunteers' data with agency monitoring data from the same location, and
       evaluate their quality and consistency.

 •     A central collection point for watershed information — including assessment data and
       information on existing and proposed agency activities — would enhance the ability of
       citizen watershed initiatives to make informed recommendations. Agencies could use
       this information to improve their awareness of community-based priority setting and
       mitigation initiatives. For example, first-year Ecology scoping activities could be
       facilitated by quickly identifying possible local sponsors.

2.13   Source Water Protection for Drinking Water Supplies

Throughout Washington state there are many well established programs for protecting drinking
water supplies for municipalities.  The Safe Drinking Water Act Amendments of 1996 (P.L. 104-
182) are the latest in a series of legislative mandates that states and local municipalities have
responded to  for development of policies and practices to protect public drinking water supplies.
In addition, the  Clean Water Act ensures protection of surface waters designated, in part, for use
as drinking water. State environmental laws have also supported programs for protection of both
surface and ground waters. These programs include the Wellhead Protection Program, Sole
Source Aquifer Program, Underground Injection Control Program, among others. RCRA,
CERCLA, and FIFRA have in conjunction with the CWA and SWDA provided authorities,
financial support, and technical assistance to protect sources of drinking water, especially ground
waters. Many municipalities established protection programs long before any state or federal
legislation was  on the books. Recently the protection of both ground and surface water supplies
has come under the common heading of source water protection.

Washington state has a Source  Water Protection Program within the Department of Health to
provide local  programs with  guidance and assistance. Many municipalities maintain programs to
manage watersheds and well-head areas that are located outside their municipal boundaries.
Examples include:

       •      Seattle - Cedar River and south Fork Tolt River watersheds
       •      Spokane - Spokane/Rathdrum Prairie Aquifer (ground water)
       •      Everett - Spada Reservoir in the Sultan Basin, and
       •      Olympia - Allison Springs Area Wells (ground water).

The municipality acts as a catalyst for watershed protection in these areas that often include
multiple landowners and managers. Building understanding and support for the policies and
practices that are necessary to protect the drinking water supply poses significant information
management  and communication support challenges.
Information Management for the Watershed Approach in the Pacific Northwest                         2-23

-------
The Association of Metropolitan Water Agencies and U.S. EPA recently sponsored a stakeholder
meeting for local water providers and state agency staff to consider guidance on Source Water
Protection that is required by the 1996 SWDA Amendments. Many of the participating
municipalities presented information on existing source water protection programs and
commented favorably on the effectiveness of a watershed approach.  However, participating
municipalities also identified the need for an established framework to improve information
management and communication support. In most cases the cities have the burden of providing
these services for other affected watershed partners including many state and federal agencies.

2.14   Other Programs

Numerous other programs in Washington support activities that may influence water quality
either within or across watersheds. Most of these do not correspond to the WQMAs established
by Ecology's Water Quality Program. However, they may be nested within the WQMAs.
Although the scope of this project did not permit interviews with representatives from all of
these groups, the programs are mentioned here to assist in future efforts to integrate and
coordinate water quality management activities:

 •     Coordinated Tribal Water Quality Program
 •     Wild Stock Initiative
 •     Conservation  Districts
 •     Agricultural Extension Service Programs
 •     Shellfish Protection Districts
 •     Integrated Landscape Management through the Department of Fish and Wildlife
 •     Local Volunteer Monitoring and/or Restoration Programs
 •     Wetland Integration Strategy
 •     Local Landuse Planning under the Growth Management Act
 •     Wellhead Protection Program
 •     Drinking Water Watershed Protection Program
 •     Comprehensive State Ground Water Protection Program Plan
 •     Ground  Water Management Area Program
 •     River Council of Washington
 •     Tribal Watershed Initiatives

2.15   Considerations Based on Watershed Planning in Washington

The diversity of programs described in the preceding subsections is depicted schematically in
Figure 2-3.  These activities form a mosaic of watershed protection efforts across a hypothetical
WQMA. The mosaic of watershed protection efforts being conducted simultaneously in any  one
basin may include preparation of plans such as habitat conservation plan, NRCS farm plans,
DNR watershed analysis, and water quality activities. Currently, the efforts of the myriad of
agency programs and local groups are not necessarily coordinated. The WQMA framework was
not developed to coordinate the mosaic of watershed planning efforts across agencies and local
Watershed Academy Information Transfer Series, No. 6                                           2-24

-------
groups. Water Quality Program resource limitations would not support such coordination.

However, a coordinated process or format for sharing data, studies, plans, projects, and
agreements within a watershed could reduce redundancy and increase efficiency of scarce public
resources. The WQMA framework, as well as other resource management programs and
activities could benefit from information sharing.

Many of the planning efforts are being performed at the local level by advisory committees
which represent a wide variety of divergent interests. Local participants may include:
landowners, business and industry, agriculture, tribes, local (city and county) governments, state
and federal agencies, port authorities, environmental interest groups, and private citizens. While
some of these local planning and implementation groups have developed,  funded, and
implemented plans that improve water quality, many more are in the early stages of working
cooperatively and building trust.  During these initial stages, the relationships are tenuous and
would not withstand the commitment needed to develop a common product such as the
Watershed Management Plan developed in other states. However, in interviews for this project,
representatives from these groups expressed a willingness and enthusiasm to share information
applicable across a WQMA as a mechanism to begin cooperation and trust-building.  Section 3
describes a model that aims to fulfill this goal.
Information Management for the Watershed Approach in the Pacific Northwest                         2-25

-------
Fig. 2-3.  Mosaic of Watershed Activities.
Watershed Academy Information Transfer Series, No. 6                                               2-26

-------
       SECTION 3.  THE WATERSHED INFORMATION CLEARINGHOUSE:
      A MODEL TO PROMOTE COMMUNICATION AND IMPLEMENTATION
                               WITHIN WATERSHEDS

Initially, this project aimed to evaluate whether Watershed Management Plans such as those
currently being used in Utah, Georgia, North Carolina, and other watershed states had potential
for application in the Pacific Northwest. The project analysis would have identified the
information and communication needs of various watershed partners and their associated
programs, mandates, and/or regulations, to determine how a shared Watershed Management Plan
might fulfill those needs or requirements. It also would have evaluated the content of each
section of the proposed Watershed Management Plan to determine whether that content fulfilled
the information and communication needs of each program, agency, and partner considered.
Project recommendations would have been directed either to changes in Watershed Management
Plan format, or to the attributes of information needed to fulfill these anticipated needs or
requirements.

The first day's interviews were based on this initial project concept. However, the project team
quickly concluded that the information and communication needs of Pacific Northwest
watershed partners required a much more dynamic and flexible model than a single written
document, such as a Watershed Management Plan could provide. The concept of a watershed
information clearinghouse emerged, which would serve as a virtual watershed atlas. Participants
responded favorably and enthusiastically when presented with this concept which responded to
their information and communication needs. Due to the strength of support for a watershed
information clearinghouse concept, the project focus shifted away from a written Watershed
Management Plan to the watershed information clearinghouse model.

The information clearinghouse concept discussed in Section 3.2 is first described as the model
under development in Yakima and secondly, as a synthesis of the ideas of interview participants
in their enthusiasm to integrate all of the watershed programs and projects in Washington.

Watershed information clearinghouses would be organized and supported by partners within
each of the established geographic areas. The information would be maintained in an electronic
format with each watershed partner having equal access to it.  The clearinghouse information
data on which partners individually and jointly  establish priorities; and in advanced cases,
clearinghouses could facilitate the development of agreements where complementary objectives
had been identified. The objectives of Section 3 are to:

 •    present a rationale for watershed information clearinghouses based on interview
      comments;

 •    describe the watershed information clearinghouse model that is under development in
      Yakima and as the concept evolved during project interviews; and
Information Management for the Watershed Approach in the Pacific Northwest                          3-1

-------
 •     list recommendations for further refinement of, potential applications of, and issues to be
       resolved in using, the watershed information clearinghouses.

3.1    Rationale for Watershed Information Clearinghouses

The rationale that emerged from project interviews for developing and using watershed
information clearinghouses in place of individual written Watershed Management Plans had two
components:

Watershed Partnerships Cannot Sustain a Common Product: Natural resource protection and
management programs in Washington are increasingly recognizing the need for an integrated
management approach.  Two factors influence this condition. First, watershed-related activities
in Washington are numerous and diverse.  Second, the amount of environmental information
available is staggering.  If data do not have to be re-gathered by each entity, it can more easily be
considered, ultimately resulting in better decision-making.  However, the political climate is not
necessarily conducive to forming partnerships between private groups and governmental
agencies.  Those partnerships that are tenuously formed, or are in their formative stages cannot
sustain a commitment to a common product or agreement such as a Watershed Management
Plan.

Nevertheless, many potential partners recognize the need for improved information management
and communication to more effectively manage resources.  Better information management and
communication would provide substantial assistance to partners in all phases of watershed
planning and  implementation. There is sufficient willingness in many locations to invest
resources and information in a shared watershed information clearinghouse.  This willingness to
invest in information sharing was encountered in Yakima, and several other watersheds
represented in the interviews. Most interview participants envisioned a broad use of the
watershed clearinghouse in providing a framework for negotiating partnership agreements, and
implementing a variety  of programs.

The Diversity of Information and Communication Needs is Better Served by a Clearinghouse:
The watershed information clearinghouse provides watershed partners with the flexibility to
address a wide range of information needs, and the capability to produce many different types of
communication products (i.e., brochures, technical documents, agreements, accounting reports).
The watershed information clearinghouse is viewed as a tool that will assist partners in
developing the diverse communication products that are necessary to successfully implement
resource protection programs using a watershed approach.  Several interview participants noted
that watershed partners  will likely be working on an increased number of common products over
time.  The clearinghouse is the first step in that direction.
Watershed Academy Information Transfer Series, No. 6                                           3-2

-------
3.2    The Watershed Information Clearinghouse Model

This section describes two watershed information clearinghouses.  Section 3.2.1 provides a
description of the Yakima information clearinghouse and associated coordinator position - a
locally initiated and implemented effort.  Section 3.2.2 describes the clearinghouse model that
could serve the needs of the myriad of Washington's potentially participating watershed and
water resource-related programs, as well as the needs of local entities.  This second model is a
synthesis and evolution of the thoughts of interview participants from a variety of agencies when
presented with the clearinghouse concept.
       3.2.1   Yakima Watershed Clearinghouse

The need for a central source of water quality related information has been a topic of discussion
by many public and private entities in the Yakima Basin for many years. The Yakima River
Watershed Council (YRWC), a partnership of local, state, and federal agencies, private interests,
and Yakima Indian Nation representatives, is working to improve water quality in the Yakima
basin.  As local watershed activities increased over the years, the need to share information
became increasingly apparent and immediate.

In December 1995, more than a dozen of these entities met to discuss how they might
collectively address information sharing needs in the watershed. The Yakima watershed
information clearinghouse and coordinator concept was born at that meeting.  The meeting
participants decided to collectively apply for a Centennial Clean Water Fund (CCWF) grant to
fund a position for a water quality (and related) information coordinator. An ad hoc grant
proposal committee was formed to seek funding. A larger committee, the oversight committee
composed of staff from state and federal  agencies, the tribe, and private organizations, was also
formed to oversee the operation of the clearinghouse and information coordinator role.  Thus, the
clearinghouse and coordinator position were created through a collaborative, community-based
process.

The information coordinator position was funded by Ecology through a $125,000 CCWF  grant.
A number of the watershed partners volunteered office space, a computer, library space, and in-
kind services and materials. The oversight committee will continue its role to ensure that the
coordinator continually meets watershed  community needs and that the coordinator receives the
necessary training and support. The coordinator's role is envisioned by the watershed partners  as
neutral - not responsible to any one agency or organization.  The coordinator will not interpret  or
edit information, nor make decisions on which data to include.  The coordinator may, upon
oversight committee decision, prepare summaries, a monthly calendar of events, and listings of
new materials.

The information clearinghouse in Yakima is intended to focus solely on the needs of the
Information Management for the Watershed Approach in the Pacific Northwest                          3-3

-------
watershed partners it serves. It is currently not envisioned to serve in preparing data of
information of decision-making agencies. The partners will jointly decide how information will
be used.

       3.2.2   Expansion of the Information Clearinghouse Concept

Interview participants enthusiastically embraced the concept of an expanded information
clearinghouse for a number of reasons.  First, participants viewed the concept as a mechanism to
coordinate watershed (geographically-based) resource management activities, without the burden
of generating a planning document.  Second, participants recognized that information sharing
can also serve to integrate management decisions across programs and agencies.  Interview
participants also realized the long-term  savings such a clearinghouse could provide by reducing
redundancy in information and environmental data gathering efforts across organizations.

Thus, the primary purpose of a clearinghouse designed to meet the needs of the diverse number
of watershed-related programs is to develop, maintain, and provide access to an electronic
database on all relevant aspects of the watershed. The clearinghouse would be designed to meet
the data needs of the participating local, state, federal, tribal and private partners in a watershed.
Watershed partners would provide environmental data, assessment reports, descriptions of their
activities or projects, and other information of interest. Data developed by local interests (e.g.,
volunteer monitoring, best management practices and implementation projects, citizen
participation opportunities) would also be included. The electronic files would be structured to
facilitate use by the watershed partners. Figure 3-1  illustrates one concept of how this
information could be indexed to create a virtual watershed atlas.  The final report of the
Intergovernmental Task Force On Monitoring Water Quality (1995) makes several
recommendations for the categorization and characterization of environmental information that
could be incorporated into the clearinghouse design.

Where possible, relevant information would be keyed to specific geographic locations within the
watershed boundaries.  The database could be structured to provide information both on a
watershed-wide basis as well as on a smaller hydrologic unit ("nested" unit) basis.  The end
result would be that users could construct maps to identify areas of concern or interest, and of the
activities of other partners, that might influence their decision-making process, describing the
content and location of the original data files.  Metafiles could include information describing:
1) the collection of and analytical methodology for environmental samples, 2) data quality
objectives for projects, 3) type of measuring units, 4) a summary of the information or project,
and 5) any other attributes of the information a user would need to determine whether or not it is
compatible with the user's intended purpose.  The use of metafiles eliminates the problems of
maintaining and updating data sets in multiple locations.
Watershed Academy Information Transfer Series, No. 6                                             3-4

-------
Fig. 3-1.  Virtual Watershed Atlas.
Information Management for the Watershed Approach in the Pacific Northwest                            3-5

-------
The watershed information clearinghouse would not recreate or replace existing databases.
Information already accessible in electronic format would be abstracted into a metafile
Information clearinghouses in each watershed would need to be accessible to all of the entities
participating in the project in a watershed and to the public. Public access could be achieved
through internet home pages.  Local public access could also be enhanced through read-only
computer access provided at libraries, county office buildings, and schools.

The concept of watershed information clearinghouses can be integrated into and consistent with
the watershed planning and implementation process described in Section 1.2. A consistent
relationship between information management activities and watershed planning and
implementation activities has been developed in other states. Figure C-l (Appendix C)
illustrates how the information management procedures for a watershed information
clearinghouse could be consistent with any step in the process. Information specialists could be
involved in more than one of the steps or activities,  depending on the needs of the watershed
information clearinghouse partners.

Additional planning would be necessary to include all of the potential watershed partners
reflected in Section 2.0 of this report to detail a full  description of the model in  each watershed.
Figure C-2 (Appendix C) provides a series  of steps for establishing an information clearinghouse
that could be followed within each of the designated geographic units (e.g., Water Quality
Management Areas) that would have a clearinghouse. These steps were used by a consortium of
watershed partners in North Carolina Neuse River Basin to  establish a watershed information
clearinghouse. There are several milestones and guidelines identified in this figure and the
process appears to be complex.  However, watershed partners will determine which steps in the
figure would need to be considered to develop a successful watershed information clearinghouse.
The primary design goal is to facilitate the use of information by watershed partners.  Section 3.3
presents recommendations made by various interview participants which should be considered
during the planning of an information clearinghouse.
3.3    Recommendations for Application and Refinement of the Clearinghouse Model

Internet Home Page: The clearinghouse should be accessible through an internet home page
site. The home page would serve as an electronic atlas that would be updated by the
clearinghouse staff on a regular basis.  The home page would offer a bulletin board for watershed
partner and user input on upcoming events and meetings. The bulletin board feature could also
be used to alert clearinghouse staff about additional data sources for acquisition.

Public Access Terminals:  To provide adequate public access to the electronic watershed
information clearinghouse, terminal connections could be maintained at several locations within
the clearinghouse boundaries (e.g., the Water Quality  Management Area). Accessible locations
that might be considered include: public libraries, schools, public buildings, or in space
Watershed Academy Information Transfer Series, No. 6                                            3-6

-------
contributed by a watershed partner.

Metafiles and Linked Databases: The clearinghouse would not reproduce information contained
within existing environmental databases. For extremely large or complex data sources the
"home page" would include a pointer, or directions, for accessing additional data. The metafile
indexes would describe the nature and purpose of the data, including any relevant quality
assurance information, but would not contain the original data. The index would contain enough
information - including date of collection or posting — to enable the reader to determine if the
information met their use criteria.

Data Use Policies:  The watershed information clearinghouse partners could select boards or
committees to develop negotiated understandings on inclusion of data submitted to the
clearinghouse. A clear understanding of the potential liabilities associated with submitting data
for public review is critical for encouraging many information sources to contribute to the
clearinghouse. For example, if a water quality violation is identified, should the information
immediately be uploaded to the clearinghouse where an enforcement agency may have access to
it, or will there be intermediate steps?  Interim steps could include strategic monitoring to
confirm the  extent and magnitude of the problem, and if there is a problem, negotiations among
involved partners to develop a suitable mitigation strategy.  Data quality will also be an area for
policy development. Data quality should be considered in determining its utility in priority
setting and development of management strategies.

Information Input and Data Security for Linked Databases: Clearinghouses should have clearly
established procedures for receiving and  incorporating new watershed information from a
diversity of  sources. Recommended policy development areas include policies for: data
inclusion, screening, and data security. The policies would be established by the watershed
partners in each watershed and would be implemented by the clearinghouse information
specialist. Interactive features of the internet home page may also raise questions of data
security not only for the clearinghouse, but also for the electronically-linked databases.

Geographic Management Units Upon Which Watershed Clearinghouses Would be Based:
Interview participants generally supported using the boundaries of the 23 Ecology Water Quality
Program - Water Quality Management Areas for the clearinghouses. However, three important
concerns were identified relating to the use of WQMAs:

  1)    The clearinghouses must be able to index on smaller (more local) hydrologic units within
       the WQMA indexing, for example, to a specific stream reach or project level.

  2)    Currently Puget Sound and the Columbia River are divided among several of the
       WQMAs.  The clearinghouse system must have the capability to consolidate information
       from the WQMAs for these water bodies.

  3)    Fish and Game and USFWS have several information and communication needs that the
Information Management for the Watershed Approach in the Pacific Northwest                          3-7

-------
       clearinghouse can support (see Section 4.1 on the Endangered Species Act). However,
       many wildlife issues require the assessment of information on a geographic scale that is
       larger than the WQMAs, such as ecoregions.

This project does not propose a definitive statement regarding the appropriate geographic scale
for establishing clearinghouses. Before this can be done, watershed partners must be consulted
regarding their concerns over the use of WQMAs or other geographic boundaries, as the
organizational unit for the watershed clearinghouses. Inter- and intra-agency, and inter-
jurisdictional agreements may need to be developed, once the watershed boundaries have been
established.

Fulfilling Technical Reporting Requirements: As the electronic watershed clearinghouses
become more established, their role in fulfilling communication needs will grow.  Some agencies
are responsible for developing and implementing programs, while others have oversight
responsibilities.  Oversight agencies could use the clearinghouses to access reporting
requirement information. For example, a local watershed could integrate and post the relevant
information needed for 305(b) reports already in existence in the clearinghouse.  The oversight
agency, EPA in this example, could then retrieve and review this information to fulfill its
oversight role. This feature places more responsibility on the oversight agency for acquiring
information, but also allows the implementing agency to focus more of its attention and
resources on local objectives.

Costs Associated With Establishing Watershed Clearinghouses: Based on information gathered
during interviews, it is clear that Ecology cannot be the primary source of funding for
establishing watershed clearinghouses.  Although no formal commitment of funds could be made
by the interview participants, they acknowledged that watershed clearinghouses would be of
sufficient value to their agencies to merit funding for the creation and maintenance of the
clearinghouse, and in some cases, the network.  Interview participants indicated that the costs
should be shared across all watershed partners,  including private sector partners.  No mechanism
was identified for consolidating funding from several agencies on a regular and sustainable basis.

Public Access Restrictions to Selected Information:  This issue is a subset of Data Use Policies
established by the local board. There is information that should not or cannot be provided to all
clearinghouse users.  In particular, the specific location of Threatened and Endangered species
cannot be included in the database that can be accessed by the general public. In  addition, it
would not be appropriate to highlight or pinpoint an individual landowner as a source of
nonpoint pollutants.  Location of information is an important factor for targeting and
implementing Habitat Conservation Plans for Endangered Species and recommended BMPs for
source areas. However, in cases where specific location information can bring harm to a species
or have liability  consequences for an individual the clearinghouse will have to ensure that the
information is sufficiently generalized to protect the interests and identify of affected parties.
Watershed Academy Information Transfer Series, No. 6                                            3-8

-------
                 SECTION 4.  SPECIFIC PROGRAM DESCRIPTIONS

Section 2 demonstrates that there are many local, state, and federal agencies, tribes, and citizen
groups working as watershed partners and contributing to the mosaic of watershed activities.
The brief overviews of partner activities included in Section 2 suggest some of the possible
opportunities and barriers within the watershed approach. The purpose of these summaries was
to highlight both the diversity of participants and programs, and the degree to which their
missions and information management and communication support needs are complementary.
Each of the interview participants is looking to better integrate their activities and fulfill their
mandates through the watershed approach. In Section 3 the watershed information
clearinghouse was proposed as a tool for helping coordinate the activities of the partners and
programs, and for improving information management and the development of communication
products.  The watershed information clearinghouse is a key component of watershed approach
capabilities for fulfilling the requirements and objectives of the Endangered Species Act and wet
weather pollution control programs.  The purpose of Section 4 is to evaluate if and how the
watershed approach can  effectively fulfill the requirements of the Endangered Species Act and
wet weather pollution control programs. This section aims to briefly summarize the regulations
that drive the watershed  activities of those partners responsible for implementing these two
program areas.  It also aims to describe how the watershed approach, together with watershed
information clearinghouses, can be used by watershed partners to more effectively fulfill the
objectives of the two program areas.

4.1     Endangered Species Act

The Endangered Species Act (ESA) was first  passed by Congress in 1973 (16 USC §§ 1531-
1543 (1982)) for the purpose of preventing the extinction of "endangered" and "threatened"
species by prohibiting both the "taking" of individuals and the destruction of critical habitat. The
ESA is relevant to aquatic ecosystem protection where aquatic species, or non-aquatic species
dependent on aquatic habitat, are listed as endangered or threatened.  The ESA is jointly
administered by the U.S. Fish and Wildlife Service (for terrestrial and native freshwater species)
and the National Marine Fisheries Service (for marine and anadromous species).

The interviews with U.S. Fish and Wildlife Service (USFWS) and National Marine Fisheries
Service (NMFS) (or together the Services) personnel focused on the use of the watershed
approach to fulfill the requirements of the Endangered Species Act. The interviews spoke to
practical issues such as existing operational procedures and products, and how these could be
enhanced through the watershed approach.

All federal agencies including EPA, are responsible for complying with the ESA. In particular,
Section 7(a)(2) requires consultation with the Services when any action funded,  authorized, or
carried out by a federal agency may affect Threatened and Endangered species listed or proposed
for listing. Section 7(a)(l) requires agencies to use their authorities to help further the goals of
the ESA.

The Services are moving in a direction that will allow them to implement the ESA in a manner
Information Management for the Watershed Approach in the Pacific Northwest                          4-1

-------
that emphasizes proactive rather than reactive measures.  The Services are working to more
effectively coordinate with private land owners and public agencies to build endangered species
considerations into their daily operations. Improved coordination will help to avoid the costly
and time-consuming litigation that has figured prominently in the implementation of the ESA to
date.  The Services have made substantial progress in adopting policies that improve the timing
and basis of negotiation with stakeholders in seeking compliance with the ESA.  Table 4-1 lists
the titles of guidance documents and informational pamphlets that describe procedures that the
Services are following to promote proactive implementation of several Sections of the ESA.
These documents were the primary reference materials used to evaluate the compatibility of the
watershed approach with the ESA.
  USFWS 1996. Biological Assessment Preparation and Review. A Workshop Sponsored by
  the U.S. Fish and Wildlife Service, Resources Northwest, Inc., and The Washington
  Chapter of the Wildlife Society. Held March 10, 1993 at The Inn at Semiahmoo,
  Washington.	
  The National Marine Fisheries Service 1995. Making Endangered Species Act
  Determinations of Effect for Individual or Grouped Actions at the Watershed Scale.
  Environmental & Technical Services Division, Habitat Conservation Branch.
  USFWS/NMFS 1994. No Surprises: Assuring Certainty for Private Landowners in
  Endangered Species Act Habitat Conservation Planning. Joint FWS/NMFS "No Surprises"
  Policy.
  USFWS n.d. What's all this stuff about "Habitat Conservation Planning" and "Incidental
  Take Permits" in Pacific Northwest Forests? U.S. Dept. of the Interior Fish & Wildlife
  Service Region 1.	
Table 4-1. Procedures and Policies Used To Implement the Endangered Species Act.

The ESA provides a clear focus on habitat protection (but only for "listed" species). For
example, Section 4 of the ESA allows agencies to determine "critical" habitat for the
maintenance and recovery of endangered species, while Section 7 requires that the impacts of
human activity on species and habitat be avoided. The pending listing of salmon species
throughout the Pacific Northwest will dramatically expand the range over which ESA provisions
apply.  The geographic range of listed species in this region will become so large that the
activities of virtually every natural resource and water quality management agency will need to
comply with the requirements  of the ESA. The salmon listing will thus require a closer linkage
to the interests and activities of water quality programs. This increased geographic scale of
application accentuates the need for a systematic  method of improving coordination among
affected stakeholders. Elements of a statewide watershed approach can provide the framework
necessary for integrating the activities of local, state, and federal stakeholders in this process.

The first four subsections (4.1.1 through 4.1.4 below) briefly describe portions of four of the
Watershed Academy Information Transfer Series, No. 6                                           4-2

-------
ESA sections that have the most relevance to watershed activities.  The final subsection (4.1.5
below) places the activities and requirements of the ESA Sections described in the preceding
subsections in the context of Ecology's Water Quality Program watershed cycle steps (described
in Section 2.1 of this report).

       4.1.1  ESA Section 4: Species Listings and Recovery Plans

Section 4 of the ESA addresses the listing process for threatened or endangered species,
designation of critical habitat, creation of recovery plans, and monitoring of species.  The listing
process for new species is well defined in terms of criteria and scheduling.  The geographic
range of species being considered for listing may extend far beyond the largest hydrological unit.
However, the accumulation of relevant information within hydrological units can improve access
to the "best scientific and commercial data available" for a species. This information could be
compiled from watershed information clearinghouses located within the geographic range of
each species under consideration.  The length of most statewide watershed cycles is five years,
which is consistent with the status review required by Section 4.

The definition of "critical habitat", which has a regulatory effect on landuse within  a watershed,
has changed over the life  of the ESA. In response to the original ESA and the Services
promulgated regulations which were based on a broad interpretation of what qualified as critical
habitat. These regulations also restricted actions that might reduce the distribution  or population
level of a species enough  to adversely affect its survival. Congress amended the ESA in 1978 to
narrow the definition of critical habitat, and to create a critical habitat designation process.
These amendments introduced balancing criteria, stating that critical habitat should only be
defined "after taking into  consideration the economic impact, and any other relevant impact, of
specifying any particular  area as critical habitat." USFWS implementation of these amendments
directs that critical habitat definitions focus only on those "principal biological or physical
constituent elements... that are essential to conservation of the species" (50 CFR §424.12(b)
(1991)).

However, subsequent rule making efforts (The Critical Habitat Final Rule, Fed. Reg. Notice for
Jan. 15, 1992 and USFWS Critical Habitat Guidance Document, Aug. 5 1992)  allowed for an
expanded definition of critical habitat through the designation of Critical Habitat Units (CHUs).
CHUs are formally designated and mapped on federal lands, and encompass a larger geographic
area than would otherwise be  considered in a critical habitat designation (as per 50  CFR
sec.424.12(b) (1991)). Furthermore, during the formal consultation process for proposed actions
on federal lands, the USFWS must consider the action's affect on the CHU as a whole, the
relationship to other CHUs, the sub-province, and the range of the species to determine whether
the action is likely to result in "destruction or adverse modification" of critical habitat
(Biological Assessment Preparation and Review, March 10, 1993, USFWS). The expanded
definition of Critical Habitat Units, and the consideration of related factors, are more compatible
with a watershed approach than the earlier strict definition of critical habitat was.

Section 4 also requires that a recovery plan for the survival and protection of listed  species be
developed after a species  has been listed, and critical habitat for that species has been defined.
Information Management for the Watershed Approach in the Pacific Northwest                           4-3

-------
The necessary components of a recovery plan are:

       1)     a description of site specific management plans necessary to achieve the goal of
              species conservation and survival;

       2)     objective, measurable criteria that when met would allow species to be removed
              from the list; and

       3)     estimates of the cost and time required for carrying out measures necessary to
              achieve the plan's goal, and to achieve intermediate steps towards that goal.

Recovery plans do not hold the force of law (i.e., they are not binding to any party).  However,
there is considerable flexibility in appointing the recovery teams that develop and implement a
recovery plan. The recovery teams may be composed of "appropriate public and private
agencies and institutions, and other qualified persons." Therefore, individual watershed teams
could serve as recovery teams. Alternatively, existing watershed teams could be incorporated
into a recovery consortium for a designated geographic area (e.g., WQMA).  Watershed or basin
plans within the defined geographic range of listed species could incorporate input from
recovery teams. Interview participants suggested that a watershed plan, or a series of mitigation
activities that have been aggregated within a watershed information clearinghouse, could
potentially contribute to a regional recovery plan. However, interview participants indicated that
the activities and requirements of Section 4 present more obstacles for integration with the
watershed approach than other Sections of the ESA.

During the interviews two features of the listing process were identified that would be difficult to
address through a watershed approach:

       •       information collection for a listing must be conducted over the known range of
              the species (i.e., across watersheds, across state and international boundaries); and

       •       the listing process has  specific criteria and scheduling that are likely to be
              inconsistent with the needs of other watershed partners.

The statewide process could provide watershed groups and teams a schedule for consulting with
the Secretary of the Interior in establishing recovery teams and developing recovery  plans once
the Coho Salmon  is listed.

Another component of the recovery process that may be satisfied with a watershed approach is
monitoring for at least five years of these species which have recovered enough to be de-listed.
Watershed Academy Information Transfer Series, No. 6                                             4-4

-------
       4.1.2  ESA Section 6: Cooperation with States

Section 6 authorizes the Secretary of the Interior to enter into agreements with states for the
administration and management of any area established for the conservation of listed species.
The requirements for an "active and adequate program" for the conservation of listed species are
as follows:

       1)      authority resides in the state agency to conserve listed species;

       2)      the state establishes acceptable conservation programs for all listed species, and
              furnishes a copy of the plan and program to the Secretary;

       3)      the state agency is authorized to conduct investigations to determine requirements
              for the survival of listed species;

       4)      the state agency is authorized to establish programs and acquire land or aquatic
              habitat for the conservation of listed species; and

       5)      provision is made for public participation in the listing process.

As long as the requirements of the agreement are met, the actual form of the agreement may be
some component of a watershed plan.

WQMA watershed teams are likely to include representatives from Ecology water quality
programs, water resource programs, Department of Natural Resources, and Fish & Game, along
with local agencies responsible for land use, among others. The combined resources and
capabilities of these programs and agencies would best meet the five listed criteria. USFWS
would need to determine whether there are viable WQMA teams for all CHUs, or for the range
of listed species.

Section 6 also authorizes up to 75% cost share for states participating in these programs, and up
to 90% cost share when two or more states cooperate in the conservation of the same species.
The cost sharing feature of Section 6 could bring an added capability to the development of
management  strategies by the watershed team. The watershed planning process includes
negotiated priority setting and targeting by the watershed team.  The Services could benefit from
watershed partners who combine data to develop an explicit list of habitat and mitigation
priorities for listed species. It is likely that a greater number of these priorities will be funded if
an effective cost share program is in place.

       4.1.3  ESA Section 7: Consultations under ESA

In relation to  federal agencies, the core of the ESA is its clear prohibition of any activity
authorized, funded, or carried out by a federal agency which may "jeopardize the continued
existence of any endangered species or threatened species or result in the destruction or adverse
modification  of habitat of such species," (ESA sec.7  (2)). The process prescribed in the ESA for
Information Management for the Watershed Approach in the Pacific Northwest                          4-5

-------
making the "jeopardy" or "no jeopardy" determination is uniform and prescriptive, thereby
offering equal treatment to agencies requesting incidental take permits.

Briefly, the process involves the following steps. First, an initial biological assessment is
conducted by the action agency (e.g., EPA) to determine whether the proposed action is likely to
"adversely affect" the listed species in question. If not, the applicant submits the assessment and
requests an informal consultation with the USFWS.  The applicant will most likely receive a "no
jeopardy" decision, and be allowed to proceed with the project.  If the action is "likely to affect"
the species, the initiator can request an informal consultation with the USFWS in order to revise
the scope of the project to reduce or eliminate its impact, and continue with the project. If the
scope of the project cannot be revised to reduce or eliminate its impact, the assessment will then
go through a formal consultation with USFWS and most likely receive a "jeopardy"
determination.  The resulting Biological Opinion specifies reasonable and prudent alternatives
allowing the project to proceed without jeopardizing species, and issues an incidental take permit
protecting the agency from additional liability.

Two features of the watershed approach could enhance the Section 7 consultation process.

 •     The watershed approach and watershed information  clearinghouses would compile all
       available information on watershed conditions.  This information could provide an
       important baseline for evaluating an action in the context of other ongoing activities. In
       other words, the watershed approach would make more information more accessible.
       This is important because in the absence of information,  the Services  must use the most
       conservative assumptions for the protection of listed species. A clearinghouse could
       greatly simplify the collection of information needed in the consultation process by those
       responsible for contacting the Services.

 •     The watershed approach follows a series of activity steps that are consistent with the
       steps that have been established for Section 7 consultations (USFWS 1996). The
       advantage to "mainstreaming" Section 7 consultations is  that issues can be identified, and
       project modifications  or mitigation strategies recommended, prior to the completion of
       the planning process, and before the agreements and logistics for implementation have
       been prepared.

Although the jeopardy or no jeopardy determination process required by the ESA is prescriptive,
there is an opportunity to streamline this process in the Biological Assessment/Evaluation
(BA/BE) phase through the use of information contained in  a watershed plan. Biological
Assessments are required for "major construction activities", and are generally more detailed
than Biological Evaluations, which are used in "other" activities. The contents of a BA include:
a project description,  site specific information including species  present and habitat types,
expected effects of the action — including interdependent and interrelated effects, and cumulative
effects within the project area, the likelihood of an "incidental take", suggested conservation
measures, and determination of effect on listed species. In a well developed watershed plan,
much of the information required for a  BA/BE will likely be available.  If not, it will be the next
time a similar information need arises, because the agency can identify the need for assessment
Watershed Academy Information Transfer Series, No. 6                                            4-6

-------
information in the watershed strategic monitoring plan.

       4.1.4 ESA Section 10: An Exception to the Rule

Clearly, "jeopardizing" the continued existence of any listed species or its habitat is not
permitted by the ESA. However, some latitude exists for actions that may incidentally result in
a "take" of some small number of a listed species or its habitat.  Landowners, like federal
agencies, who believe that their otherwise lawful activity may result in a "take" of listed species
may apply to the USFWS for an "incidental take permit." An incidental take permit is not a "get
out of jail free card" however, because in order to be considered for the permit the landowner
must submit a detailed Habitat Conservation Plan (HCP). An HCP is an assessment of the
impacts likely to result from the taking of the species, a list of measures the applicant will take to
monitor, minimize, and mitigate those impacts, a consideration of alternatives to the take, and
any additional measures the USFWS may require as necessary or appropriate.

Functionally, an HCP is a legally binding agreement made between the applicant and the
USFWS. It exchanges some takes for a detailed, long-term commitment from the landowner to
implement mitigation and/or conservation measures as part of the proposed action.  As an
additional incentive, the landowner is assured that even if the needs of the species change over
time, no additional land or financial commitments will be required of the landowner for the full
term of the HCP, which can be 50-100 years (USGS/NMFS, 1994. "No Surprises").

Thus there are strong incentives for both the landowner and the  Services to enter into HCP's, and
there is considerable flexibility in the design and scope of the Plan. The scope, content, and time
frame of the HCP are determined through agreements made between the Services and the
landowner; not by guidelines in the ESA. Thus  each HCP can incorporate the specific needs of
the species, the landowner, and the watershed(s) in  which they reside.  These factors combine to
make HCPs a potentially important tool in watershed planning efforts.

       4.1.5 ESA Activities Integrated Within the Watershed Approach

Ecology is only one of many watershed partners that will be coordinating with the USFWS and
the NMFS through the watershed approach to address endangered species requirements. The
cycle steps of the Ecology watershed approach are chosen for analysis in this subsection because
it is a statewide process that has the capability to include the activities of most other watershed
partners. The statewide sequence and schedule of activities is not prescriptive, and  should never
delay the development and implementation of local individual agreements. Rather,  the advance
notice and systematic support of watershed teams provided through the statewide framework
serves as a catalyst and provides increased capabilities to locally sponsored initiatives.

The watershed approach cycle steps (Scoping, Data Collection and Analysis, Technical Report,
and Implementation)  are used by Ecology to organize its own activities within a geographic unit
(i.e., WQMA).  The process provides predictability to other watershed partners.  Because
Ecology does not have sufficient resources to simultaneously implement all aspects of its
watershed approach statewide, it needed a mechanism to manage its work load and resource
Information Management for the Watershed Approach in the Pacific Northwest                          4-7

-------
demands. Sequencing through the WQMAs using the watershed steps provides this capability to
Ecology.  The watershed cycle could also be used as a tool by other watershed partners to
coordinate their activities on watershed teams.  It is well understood that the watershed cycle
will not always match the timing needs of others. Where possible, Ecology could amend its
schedule to match local circumstances. There will also be determinations that must be made
outside of the cycle schedule. In general, however, the cycle could be a useful tool for
coordinating activities within watersheds statewide.  The discussion below examines how each
of the four watershed approach cycle steps could incorporate ESA activities and requirements.

Scoping: The Scoping step includes: outreach activities such as stakeholder meetings and
speaking to community groups, newsletters, making contact with established watershed groups,
recruitment of a local sponsor, and formation of watershed teams.  A key product of this step is
the initiation of discussion regarding WQMA goals, objectives, and water quality concerns. In
addition, the collection of information for the watershed information clearinghouse begins.

       Section 4:

 •     The listing process requires information on many variables in order to make initial listing
       decisions, and to update the five-year listing status. During the scoping phase,
       information that is compiled into the watershed information clearinghouse can be used
       for the listing determination.

       Section 6:

 •     The Services could provide outreach information on grant availability (approximate
       dollar amount), and procedures for applying for cost share grants.

       Section 7:

 •     Agencies can contact the  Services regarding the schedule and scope of their activities
       within the WQMA as part of the stakeholder outreach process.  The Services can make
       the species list and designated critical habitat available to the watershed  team(s).

 •     The Services could "piggyback" onto the outreach efforts of the watershed team(s). This
       might be  a good opportunity for education aiming to diffuse misunderstandings regarding
       ESA regulations and requirements.

 •     If major projects or activities are ongoing or are already targeted, Scoping could provide
       a starting point for the informal consultation process.
Watershed Academy Information Transfer Series, No. 6

-------
 •     The watershed plan describes specific management actions that participating agencies
       will take to restore or protect the watershed. The commitments and agreements that are
       part of the watershed plan can be incorporated by reference into a program level
       consultation and or a pre-listing agreement.  The Services could also participate on the
       watershed team to help develop the management strategies.

       Section 10:

 •     The outreach and education component of the Scoping step provides a good opportunity
       to recruit interest among landowners and managers regarding the Habitat Conservation
       Program.

Data Collection and Analysis: Ecology and other watershed team members evaluate the goals,
objectives, and  concerns identified in the Scoping step to develop a strategic monitoring and
information collection plan that addresses the information needs identified with each.  Strategic
monitoring collects information to support assessments for priority setting,  and the development
of management strategies. To the  extent possible, the monitoring resources of watershed team
members are coordinated to improve the temporal and spatial coverage of the watershed unit.
The watershed analysis results compiled by the Department of Natural Resources provide one
example of collaborative information.  Many other opportunities for coordinated priority setting
for  the use of monitoring resources were discovered during project interviews. Those
opportunities would be realized during this step.  Assessment information is used to begin
prioritizing the  concerns identified in the previous step. Watershed teams can use either formal
or informal priority setting procedures.  The purpose is to target a subset of project objectives for
the  further development of a management strategy.  Outreach and stakeholder meetings would
follow a similar course for priority setting. Targeted project objectives would be carried forward
to the next step for inclusion in the Technical Report.

       Section 4:

 •     Listing information needs could be included in the development of the WQMA strategic
       monitoring plan.

       Section 6:

 •     The monitoring and information collection plan would need to address the information
       needs associated with  cost  share grant requirements.

 •     Preliminary decisions  for nominating project objectives for cost share grant support could
       be made.

       Section 7:

 •     The strategic monitoring plan should incorporate the information needs associated with
       the ecological goals that are identified in  recovery plans, or the listing determination for
Information Management for the Watershed Approach in the Pacific Northwest                          4-9

-------
       species that occur within the WQMA. Example factors and indicators have been
       identified through a coarse screening process for potential application in ESA
       consultations (available through the Services).  A few of these factors include:  stream
       temperature, water quantity and timing, habitat condition, and sediment. These are
       parameters that will often be of interest to the watershed team regardless of ESA
       considerations.

 •     The Services could consult with the watershed team regarding the need for and design of
       Biological Assessment or Biological Evaluation for those projects that have already been
       targeted as WQMA objectives.  This could be either an extension of the informal
       consultation process, or the beginning of the formal consultation.

 •     If the Services determines that the targeted project is likely to have an adverse affect, the
       project should be resubmitted to the watershed team for further priority setting and
       targeting consideration.

 •     If the reevaluated project is still considered a priority, the watershed team will need to
       enhance the monitoring and assessment plan for the project in order to support the
       information needs of the formal consultation process. In addition, the watershed team
       will need to refine the management strategy for the project for mitigation and alternative
       designs that may help avoid a jeopardy/adverse modification opinion.

 •     In priority setting and identifying measures of success, the watershed team should
       incorporate either those objectives  identified in the recovery plan, or coarse screening
       objectives used for making Section 7 Determination of Effects.

 •     Interview participants supported the process used in the President's Forest Plan initiative.
       However, the information  that was produced was often on too large of a scale to be useful
       in the consultation process. The nested watersheds that are a feature of the Ecology
       watershed approach should help to address this question of scale.

 •     Participation of the Services with other watershed partners on the watershed team will
       facilitate the early identification of project components (e.g., site specific standards,
       habitat restoration, grazing policies, water use allocations) that will require programmatic
       consultation.  Early identification allows the regular watershed planning process to
       support the programmatic  consultation process, instead of making this a separate process
       that requires additional project resources.

       Section 10:

 •     The Services could begin working  with those who have requested HCP support. The
       Services could target their assistance to high priority areas within the WQMA by using
       the comprehensive watershed assessment information.

Technical Report:  The Ecology Technical Report is a short description of project objectives that
Watershed Academy Information Transfer Series, No. 6                                            4-10

-------
have been selected for the watershed.  The report is short because of the limited resources that
are available for its production. The watershed information clearinghouse could address this
issue by enabling Technical Reports to include more information in the future.  The Technical
Report serves an important function, because it notifies residents and other watershed partners
who will be doing what, where, and when. In the past, it has typically covered only Ecology's
activities. However, as watershed partnerships expand, the scope of the Technical Report may
also have to expand. The Technical Report is a subset of the information that would be included
in the watershed information clearinghouse.  The Ecology Technical Report could include
sufficient information to support the ESA programmatic consultation process if other watershed
partners contributed to its production.

       Section 4:

 •     The Technical Report could include information on the status of listed species found
       within the WQMA.

       Section 6:

 •     The Technical Report can be used as a formal application for a cost sharing grant. The
       information compiled during the watershed planning process can provide supporting
       documentation and a rationale for the grant.

       Section 7:

 •     The Technical Report can incorporate the modifications that are necessary for addressing
       the issues raised in the USFWS/NMFS Biological Opinion.  It can also include any
       formal  agreements that are made as part of the programmatic consultation process.

 •     For projects that are abandoned, the Technical Report can lay the groundwork for an
       alternative design to be investigated in the next watershed cycle.

 •     The Technical Report could include all of the information from any completed BAs or
       BEs, and any Biological Opinion submitted by USFWS  or NMFS. The accumulated
       information may satisfy any Environmental Impact Statement requirements for approved
       projects.

       Section 10:

 •     Project interview participants indicated that land owners and managers who have
       completed the HCP process are very proud of their agreements. Completed HCPs could
       be included in Technical Reports to advertise these successes, and to serve as examples
       to other HCP candidates.

Implementation: Implementation will be tracked through watershed newsletters and information
that is available through the watershed information clearinghouse.  The Technical Report will
Information Management for the Watershed Approach in the Pacific Northwest                         4-11

-------
also provide a reference point for tracking progress.

       Section 4:

 •     Project implementation plans could include provisions for monitoring to support the
       update of the species status in the next iteration of the watershed cycle.

       Section 6:

 •     Grants could be allocated to targeted projects. The cycle would facilitate the
       coordination of collaborative funding. Grant tracking and project reporting could be
       made consistent with the information gathering activities included in the watershed cycle.


       Section 7:

 •     Compliance checks throughout the WQMA could be better coordinated. The list of
       approved projects could be updated on a regular basis, consistent with the watershed
       cycle.

 •     Implementation agreements would be consistent with the findings of the consultation
       process. These agreements would be completed on the same schedule as other watershed
       partners. This would result in improved coordination among watershed  partners that are
       collaborating on projects.

•      Assist with assessing cumulative impacts ("inter-related projects").

       Section 10:

 •     Individual HCP agreements are tailored to each land owner or land manager. However,
       the knowledge gained from other agreements could be transferred among agreements in
       the same watershed. This could facilitate the completion of more agreements in a shorter
       period of time, and could improve consistency among mitigation requirements for those
       components of the HCPs that support a common approach.

Conclusion: The watershed approach process can readily incorporate ESA considerations and
the process that has been designated by the Services. The Watershed Approach planning and
implementation steps can replace or be used in lieu of the procedures currently  recommended for
use by the Services. Several Pacific Northwest and other states use watershed approach steps for
information collection, assessment,  development, and implementation of management strategies
that could fulfill the requirements of the ESA. The coordinated action promoted by the use of a
watershed framework will significantly  strengthen mitigation and recovery efforts undertaken
through the ESA.
Watershed Academy Information Transfer Series, No. 6                                          4-12

-------
4.2    Wet Weather Programs

There are a number of different programs in Washington for controlling pollution from wet
weather flows that can be considered for inclusion in a watershed approach.  These programs are
mandated at the federal, state, and local levels and are implemented within the context of
NPDES permits, lending themselves to the five-year cycle established by the WQMA process.
These programs are briefly described here and are described in further detail in the subsequent
sections.
The combined sewer overflow (CSO) reduction program was initiated for all municipalities and
counties by the state in 1985, although some activity was underway in Seattle Metro as early as
1975. The purpose of the legislation was to achieve the greatest possible reduction at the earliest
possible date. In 1987, the Puget Sound Water Quality Management Plan (Plan) (PSWQA,
1994) directed major attention to storm water and combined sewer overflows in the Puget Sound
region.  The Plan contains elements that:  recognize and encourage Ecology to complete the CSO
guidelines and rule; direct Puget Sound municipalities to submit CSO reduction plans to
Ecology; direct local jurisdictions to prepare comprehensive storm water plans;  direct Ecology to
provide technical assistance and guidelines for local jurisdictions; and encourages storm water
pollution prevention planning in smaller watersheds under Chapter 400-12 WAC.

In response to the need for comprehensive NPDES requirements for discharges  of storm water,
the U.S. Congress amended the CWA in 1987 to require the EPA to establish phased NPDES
requirements  for storm water discharges.  EPA published the initial permit application
requirements  for certain categories of storm water discharges associated with industrial activity,
and discharges from municipal separate storm sewer systems located in municipalities with a
population of 100,000 or more in November 1990. Storm water discharge permits provide a
mechanism for establishing appropriate controls for discharge of pollutants to waters of the
United States.

EPA has recently chartered the Urban Wet Weather Federal Advisory Committee and its
Sanitary Sewer Overflow (SSO) and  Storm Water Phase II Subcommittees under the Federal
Advisory Committee Act.  EPA formed these Committees to develop recommendations for
coordinating the implementation of wet weather pollution control programs and cost-effective
solutions for controlling the impacts of urban wet weather flows.  The Committees provide a
forum for identifying and addressing a wide range of issues associated with water quality
impacts from  urban wet weather flows.

The Federal Advisory Committee on Urban Wet Weather Flows is currently formulating a
"Watershed Alternative" for including wet weather programs in the watershed framework. The
focus of the discussion in Section 4.2.3 assumes that wet weather programs will be encompassed
in the watershed framework. The subsequent subsections provide perspective on the wet
weather programs in Washington and consider the utility of the more open model of the
watershed approach described in Section 3.0.

       4.2.1   Combined Sewer Overflows
Information Management for the Watershed Approach in the Pacific Northwest                        4-13

-------
In 1985, the Washington State Legislature enacted House Bill 815 (codified as Chapter
90.48.460-490) RCW) which required all municipalities with CSOs to submit CSO Reduction
Plans to Ecology by January 1, 1988. The plans were to achieve the greatest possible reduction
at the earliest possible date.  They included locations, baseline annual frequency and volume and
some water quality and sediment sampling data. By  1987, Ecology had defined the greatest
possible reduction as one overflow per year at each CSO, and had negotiated interim goals of 75
percent and 79 percent reductions of CSO volumes system-wide by 1997.  Reductions to one
overflow per year negotiated by Washington were more stringent that the national policy.

Ecology developed CSO reduction rules (Chapter 173-245) and guidelines for implementation in
1987. EPA approved Ecology's CSO program in 1991.  CSO Reduction Plans, must include:

 •     Field assessment and mathematical modeling to establish each CSO's location, baseline
       annual frequency, and annual volume

 •     Flow monitoring and sampling data sufficient to establish correlations between and
       among the group of CSO sites

 •     Analysis of control/treatment alternatives that considers best management practices
       (BMPs), pretreatment programs, and sewer use maintenance programs, as well as
       retention and separation technologies.

 •     An estimate of the water quality and sediment impacts from the proposed treatment
       alternatives.

All Washington municipalities with CSOs are continuing to control CSOs, typically utilizing
separation and/or storage. Separation into separate storm sewers is generally less expensive and
is consistent with the NPDES regulations (PSWQA,  1994).

At the federal level, EPA developed the National Combined Sewer Overflow Control Strategy in
1989. The strategy identified the following three objectives:

 •     Ensure that if CSOs occur, they are only as a  result of wet weather

 •     Bring all wet weather CSO discharge points into compliance with the technology-based
       and water quality-based requirements under the CWA

 •     Minimize the impacts of CSOs on water quality, aquatic biota, and human health from
       CSOs (EPA, 1995).

In addition, EPA required all States to develop state-wide permitting strategies designed to
reduce, eliminate, or control CSOs.

Although the CSO Strategy was successful in focusing increased attention on CSOs, it fell short
in resolving many fundamental issues.  In mid-1991,  EPA initiated a process to accelerate
Watershed Academy Information Transfer Series, No. 6                                          4-14

-------
implementation of the Strategy.  The process included negotiations with representatives of the
regulated community, State regulatory agencies, and environmental groups. These negotiations
were conducted through the Office of Water Management Advisory Group. The initiative
resulted in the development of a CSO Control Policy, which was published in the Federal
Register on April 19, 1994 (59 Federal Register 18688). The intent of the CSO Control Policy
is to:

       •     Provide guidance to permittees with CSOs, NPDES permitting and enforcement
             authorities, and state water quality standards (WQS) authorities

       •     Ensure coordination among the appropriate parties in planning, selecting,
             designing, and implementing CSO management practices and controls to meet the
             requirements of the CWA

       •     Ensure public involvement during the decision-making process.

The CSO Control Policy contains provisions for developing appropriate, site-specific NPDES
permit requirements for all CSOs that overflow due to wet weather events. It also announces an
enforcement initiative that requires the immediate  elimination of overflows that occur during dry
weather and ensures that the remaining CWA requirements are complied with as soon as
possible.

Key Elements of the CSO Control Policy

The CSO Control Policy contains four key principles to ensure that CSO controls are cost-
effective and meet the requirements of the CWA:

       •     Provide clear levels of control that would be presumed to meet appropriate health
             and environmental objectives

       •     Provide sufficient flexibility to municipalities, especially those that are financially
             disadvantaged, to consider the site-specific nature of CSOs and to determine the
             most cost-effective means of reducing pollutants and meeting CWA objectives
             and requirements

       •     Allow a phased approach for implementation of CSO controls considering a
             community's financial capability

       •     Review and revise, as appropriate, Water quality standards and their
             implementation procedures when developing long-term CSO control plans to
             reflect the site-specific wet weather impacts of CSOs.

In addition, the CSO Control Policy clearly defines expectations for permittees, State WQS
authorities, and NPDES permitting and enforcement authorities.  These expectations include the
following:
Information Management for the Watershed Approach in the Pacific Northwest                         4-15

-------
       •      Permittees should immediately implement the nine minimum controls (NMC),
             which are technology-based actions or measures designed to reduce CSOs and
             their effects on receiving water quality, as soon as practicable but no later than
             January 1, 1997.

       •      Permittees should give priority to environmentally  sensitive areas.

       •      Permittees should develop long-term control plans  (LTCPs) for controlling CSOs.
             A permittee may use one of two approaches: 1) demonstrate that its plan is
             adequate to meet the water quality-based requirements of the CWA
             ("demonstration approach"), or 2) implement a minimum level of treatment (e.g.,
             primary clarification of at least 85 percent of the collected combined sewage
             flows) that is presumed to meet the water quality-based requirements of the
             CWA, unless data indicate otherwise ("presumption approach").

       •      WQS authorities should review and revise, as appropriate, State WQS during the
             CSO long-term planning process.

       •      NPDES permitting authorities should consider the financial capability of
             permittees when reviewing CSO control plans.

In addition to these key elements and expectations, the CSO Control Policy also addresses
important issues such as ongoing or completed CSO  control projects, public participation, small
communities, and watershed planning.

The CSO program in Washington is implemented through NPDES permits issued by Ecology to
municipalities.  Many of the municipal  permits have  not bee re-issued to incorporate CSO
control policy provisions, due to the backlog.  The permits that have been re-issued include
reporting requirements which entail an  annual report summarizing the actions that the
municipality has implemented within the preceding year, as well as any sampling results
obtained. These reports could be produced from data stored on the virtual watershed atlas.  The
atlas could also serve to direct interested parties to the report, or a mechanism of distributing
annual status information to interested watershed residents, as one forum for public outreach and
education.

       4.2.2  Separate Storm Sewers

A requirement for comprehensive storm water planning for all urbanized areas within the 12-
county Puget Sound region was established in the 1987 Puget Sound Water Quality Management
Plan (Plan) (PSWQA, 1994). The Plan also directed Ecology to develop technical manuals for
use by local jurisdictions in storm water planning. Ecology's response was a technical
manual (Ecology, 1992) that provides engineered designs and best management practices for
storm water pollutant control.

To meet the requirements of the CWA Amendments  of 1987, EPA promulgated storm water
Watershed Academy Information Transfer Series, No. 6                                          4-16

-------
regulations in 1990. These regulations provided for a phased approach to control of municipal
storm water discharges, requiring large municipalities (>250,000 population) to submit a Part 1
NPDES applications by November 1991 and medium municipalities (populations between
100,000 and 250,000) by May 1992. Part 1 applications provided general information about the
municipal storm sewer system such as: the municipality's legal authority to control discharges to
the storm sewer, a topographic depiction of the entire drainage, landuse data and locations of
outfalls, characterization of the discharge quantity and quality.

Part 2 of the large and medium municipal NPDES permit storm water application, which was
required to be submitted to the permitting  authority one year after Part 1, required
comprehensive  storm water management plans to be developed.  The plans were to include: an
inspection program, analytical results of any sampling performed, a program to identify illicit
discharges, estimates of annual pollutant loads to the water bodies from the storm  sewer
discharges, a proposed monitoring program, and other components designed to address specific
sources of pollutants.

EPA is currently developing Phase II storm water regulations which will apply to smaller
municipalities.  In developing the regulations, EPA is striving to encourage permitting
authorities to address all storm water sources on a watershed basis.

By 1990, EPA had promulgated regulations requiring management of storm water discharges
associated with  industrial activity. Most of these industries were eligible for a General Permit
for Storm Water Discharges Associated with Industrial Activities, others required  individual
NPDES permits. As part of the second phase, EPA may also extend current regulation of
industrial dischargers to a wider variety of standard industrial  classifications.  The Phase II storm
water regulations are anticipated to be proposed by September of 1997.

In Washington,  the Water Quality Program of Ecology is issuing NPDES storm water permits on
a watershed basis.  All large and medium municipalities within a Water Quality Management
Area (WQMA)  are permitted under one permit.  The Cedar/Green Water Quality Management
Area permit (Ecology 1995) includes the following additional requirements:

 •     Assess the degree to which storm water discharges are impacting selected receiving
       waters and sediments.

 •     Evaluate the effectiveness of selected BMPs

 •     Develop a mechanism for gathering maintaining and using adequate information to
       conduct planning, priority setting, and program evaluation activities.

 •     Identification of watershed-wide coordination mechanisms and a schedule  to complete
       the  storm water management plans among permittees that share waterbodies;
       coordination of data management capabilities and modeling  capabilities.

One of the permittees under this NPDES permit is the Washington Department of Transportation
Information Management for the Watershed Approach in the Pacific Northwest                        4-17

-------
(WSDOT) (Ecology, 1995). Specific conditions apply to WSDOT activities in managing storm
water from WSDOT roads and highways.

       4.2.3  Sanitary Sewer Overflows

In late 1994, a number of municipalities approached EPA asking the Agency for greater national
clarity and consistency in the NPDES requirements apply to sanitary sewer overflows (SSOs).
EPA formed an internal work group which concluded that the regulation of SSOs varies from
state to state and among EPA regions, and decided to convene a national "policy dialogue"
among the stakeholders.  The SSO Advisory Subcommittee was formed and began meeting in
December 1994.  The committee is examining the need for national consistency in permitting
and enforcement, effective sewer operation and maintenance principals, public notification for
SSOs with potential health or environmental dangers and other public policy issues. One of the
issues the SSO Advisory Subcommittee is discussing is the storm size and frequency from which
SSOs are likely to occur. EPA was asked to consider the Subcommittee's recommendations for
regulatory and non-regulatory actions to reduce SSOs nationally.

In Washington, one of the EPA Region 10  states, SSOs are prohibited. SSO incidents are
managed through sewage treatment plant NPDES permit compliance schedules, notices of
correction, or available enforcement mechanisms.  If SSOs are identified through self-reporting,
citizen identification, inspections, or general sewer planning, the NPDES permit is modified to
require corrective action.  Corrective actions may include: identification and separation of cross
connections between storm and sanitary sewers, increase pumping station capacity, and inflow
and infiltration reduction program implementation. Management of SSOs in the other three EPA
Region 10 states (Oregon, Idaho, and Alaska) may vary.

       4.2.4 Integrating Wet Weather Flow Programs into the Watershed Approach

The discussion in Section 3.0 focused on the utility of an expanded information clearinghouse
for a host of potential watershed partners. Clearinghouses would be used for assimilating data
and providing a common storage platform for watershed information including water quality
data, agreements among the various parties within a watershed, and indices with metafiles
describing monitoring or project  objectives, quality assurance programs, type of data, etc. for
other sources of data.

The wet weather programs lend themselves to the WQMA watershed model because they are
implemented as part of the NPDES program in Washington, for which the WQMA approach was
designed.  The wet weather programs can benefit from a shared information platform such as the
clearinghouse. For the most part, wet weather programs do not require an extensive amount of
reporting to the oversight or permitting agencies.  However, the information clearinghouse
would serve well as an integrating tool. The open platform can serve as a mechanism for
information sharing basin-wide and can be easily incorporated into the five-year cycle. From a
basis of common information, partners within the watershed could develop management
strategies with shared vision and priorities. The subsequent paragraphs describe how wet
weather programs could utilize and benefit from a watershed information clearinghouse.
Watershed Academy Information Transfer Series, No. 6                                          4-18

-------
Scoping: The Scoping step includes: outreach activities such as meetings with potential
watershed partners and community groups, newsletters, recruitment of a local sponsor, and
formation of watershed teams. A key product of this step is the initiation of discussion regarding
WQMA goals, objectives, and water quality concerns.  In addition, the collection of information
for the watershed information clearinghouse begins.

       CSOs

•      Outreach activities initiated by Ecology in the WQMA scoping process should target not
       only the sewer utilities with jurisdiction over CSOs, but also community groups with a
       demonstrated interest in CSO issues.

•      Outreach activities targeting the public could be conducted, in part, through the
       clearinghouse once it has been established.

•      Sewer utilities may have already identified the environmentally sensitive areas in the
       vicinities of CSOs required under the national CSO Policy. This information, any
       sampling data, and locations of CSOs that may be stored in GIS (e.g., Seattle has a GIS
       system with CSO locations) could be shared during the scoping process.

•      Status  on the utilities' implementation of the Nine Minimum Controls should also be
       shared, electronically, if possible, during this period.

•      In a spirit of partnership and potential for shared priority setting, sewer utilities may have
       collected data concerning CSOs not specifically required under NPDES permit and not
       previously shared with the permitting authority.

       STORM WATER

•      Storm water utilities  are not necessarily managed by the same jurisdictions that manage
       sanitary sewer utilities. It is critical to ensure that all the potentially regulated entities are
       brought into the partnership.

•      Inclusion of established local watershed groups is critical for wet weather programs.
       These groups perform activities that either directly or indirectly (e.g., education) reduce
       nonpoint sources of pollution that can impact storm water quality.

•      Inclusion of a wide variety of community groups can assist storm water permittees in
       meting the public outreach component of the storm water management program required
       under their storm water permit.  Community groups will be helpful in identifying
       contaminant sources  such as illicit discharges to sewers, locations of storm water outfalls,
       or local projects that  have been implemented that improve water quality.

•      Representatives of industry should be included in the initial outreach meetings.  Although
       these industries are not required to perform monitoring under the Ecology issued Storm
Information Management for the Watershed Approach in the Pacific Northwest                         4-19

-------
       Water General Permit for Industrial Activities, these industries are required to develop
       and implement storm water pollution prevention plans.

       A watershed clearinghouse could serve as water shed-wide coordination mechanism for
       sharing data, models, GIS maps, and sharing analysis of BMP effectiveness studies.
       Currently, data are housed in numerous locations with relatively limited access. For
       example, EPA and Ecology maintain separate databases with data gathered from
       municipal and industrial discharger reports that may include storm water monitoring data.
       EPA maintains location information on dischargers in GIS that could be relevant to the
       quality of storm water within a WQMA.

       In King and Snohomish counties, the surface water utilities not only manage storm water
       but also gathers monitoring data on the quality of the smaller drainages within their
       boundaries. These utilities have invested in GIS systems that can depict the information
       graphically.  In Snohomish county, for example, $100,000 has been invested to create
       data layers for drainages, landuses, locations of water quality complaints received.  They
       are intending to add stream gaging stations, locations of minor flooding, and areas in
       which erosion controls have been instituted. King County has data on land use,
       drainages, storm water discharge locations stored electronically. They also maintain
       stream habitat information, although this is not currently in electronic format. This
       information is valuable to the WQMA process for several reasons. First, display of
       information geographically can provide a useful tool for the public to understand the
       watershed issues. Graphical displays of information can also assist decision-makers in
       more readily establishing priorities.  Second, surface water management agencies at the
       county level have already made investments in databases, although not all information is
       electronically stored. Continued investment in existing systems is more economically
       justified than re-creation of such systems. Third, these utilities may provide local
       sponsorship for the watershed information clearinghouses, although agreements with
       other partners would need to be developed and implemented describing financial support
       to the system and data access.

       The Ecology issued WQMA storm water permits require utilities to gather and maintain
       information about the following items: location of storm water  outfalls, drainage areas,
       land uses, zoning, precipitation, and storm water quality and quantity monitoring results.
       The 1995-issued permits also require a monitoring program be developed to estimate
       concentrations and loads from representative areas within the jurisdiction's portion of the
       basin, identify pollutant sources, evaluate the impacts of storm water discharge on
       receiving waters and sediments, and evaluate the effectiveness of best management
       practices.  Some of this information may be accessible  electronically and either imported
       into the information clearinghouse or accessed through a linkage.

       Industries may have access to information relevant to pollution control in the storm
       water. For industries that have individual storm water permits, discharge monitoring data
       may be maintained electronically by either Ecology or EPA. These data may be relevant.
Watershed Academy Information Transfer Series, No. 6                                           4-20

-------
       Sharing information from all watershed partners during the scoping, and monitoring
       phases through a single watershed information clearinghouse will facilitate access to
       information and provide for better prioritization and decision-making of future
       monitoring needs.

       SSOs

•      Because sanitary sewer overflows are prohibited, municipal sewer utilities within the
       watershed will maintain information on the number and locations of storm sewer
       overflows.  They may also be able to provide likely causes of recurrent overflows.

•      Records of citizen identification of SSOs could also be included in the information
       clearinghouse.

Data Collection and Analysis: The watershed partners evaluate the goals, objectives, and
concerns identified in the Scoping step to develop a strategic monitoring and information
collection plan that addresses the information needs identified with each. Under the plan,
partners collect information to support assessments for priority setting, and the development of
management strategies. Monitoring resources of each of the watershed partners should be
coordinated to improve the temporal and spatial coverage of the watershed unit. Coordinated
priority setting for the use of monitoring resources can identify synergistic data collection
opportunities that will enhance the amount of relevant data collected. Assessment information is
used to begin prioritizing the concerns identified in the previous step. Prioritization of concerns
can be either a formal or informal process. The purpose is to target a subset of objectives for the
further development of a management strategy and inclusion in the Technical Report.

       CSOs

•      Shared evaluation of the WQMA objectives can provide perspective on the level of
       priority of CSOs for Ecology and the sewer utilities within the WQMA. Understanding
       these priorities can often clarify information gaps that would need to be required to
       address CSOs.

•      Sharing of existing information may reduce the need for additional monitoring or may
       enable monitoring to be performed in tandem with other monitoring, thus  creating
       efficiencies.

       STORM WATER

•      In developing a monitoring strategy, partners can coordinate monitoring programs,
       reducing redundancy or establishing synergies for collecting, for instance  a few samples
       for additional parameter analysis that will enhance the overall monitoring program.

•      The ambient monitoring performed by the surface water utilities in King and Snohomish
       counties will greatly  enhance the data collected by Ecology's ambient monitoring
Information Management for the Watershed Approach in the Pacific Northwest                         4-21

-------
       program.

•      As data become available and are posted on the watershed information clearinghouse,
       prioritizing actions could be based on the severity of contaminant loading or on the
       impacts measured in the water body.

       SSOs

•      Citizen-sewer utility partnerships developed as a result of a watershed information
       clearinghouse could perform focused studies of past incidents of storm sewer overflows
       which may be able to provide likely causes of and potential corrective actions for
       recurrent overflows. Investigations of causes could include focus on potential cross-
       connections between storm and sanitary sewers, and identification of locations of high
       inflow and infiltration.

•      Studies identified without a sufficiently high priority to merit funding, could be piggy-
       backed on other studies with minimal addition of funding. This is one mechanism to
       accomplish the objective.

The process of sharing in the gathering and analysis of information will assist the watershed
partners to build consensus about the risk and priorities, and to understand the associated costs
and benefits of addressing wet weather pollutant sources.

Technical Report:  The WQMA Technical  Report is a short description of priority objectives that
have been selected for the watershed. The  report development process should document the
priorities developed jointly by the watershed partners. During the report preparation process, the
watershed information clearinghouse would provide access to more information to include in the
Technical Report.  The report should also be expanded to include not only Ecology's activities,
but also the activities of other watershed partners in controlling pollution form wet weather
flows.  The Technical Report should also be posted on the clearinghouse as notification to
residents and other watershed partners who will  be doing what, where, and when.

In some watersheds,  the process of joint assessment of priorities may result in a demonstration
that wet weather flows contribute one of the highest pollutant loads to the waterbody and, thus,
actions that reduce or eliminate  the pollutant loads should be implemented first. In other
watersheds, greater pollutant loading may be contributed by activities other than wet weather
flows.  In these areas, watershed planning bodies may develop strategies to  manage those
activities that impact the water bodies most severely first.  As the clearinghouse information is
re-visited in subsequent planning efforts, consensus will most likely direct efforts to address the
highest remaining priority pollutant sources first.

       CSOs

•      The Technical Report can provide a forum for balancing the severity of environmental
       problems. For example, pollutant loading from a specific CSO may actually be rated as a
Watershed Academy Information Transfer Series, No. 6                                            4-22

-------
       lower priority than upgrading the sewage treatment plant, control of specific storm water
       discharges, or removal of a hot spot of contaminated sediment which adversely impacts
       the benthic biota.  For example, King County is evaluating the relative impact of its
       CSOs on the Duwamish River to decide where to spend its limited resources. The study
       may identify a mechanism other than CSO reduction to improve water and sediment
       quality in the Duwamish.  If this information were shared in the technical report, Ecology
       and King County could begin discussing alternatives for meeting the Clean Water Act
       objectives.  Flexibility for such discussions is encouraged in the CSO Control Policy.
       Thus, the technical report provides the forum for balancing of environmental priorities
       with limited funding sources. Balancing environmental priorities across statutory or
       programmatic requirements suggests a pooling of funding resources across jurisdictional
       boundaries (state,  cities, counties, wastewater utilities, storm water utilities). However,
       pooled funding is  an issue that will require serious consideration by the watershed
       partners and changes to current practices and potentially to regulatory requirements.

       STORM WATER

       The Technical Report could contain both an assessment of storm water quality in the
       WQMA and sources of contamination - industrial storm water,  urban storm water and
       their relative contributions.  Thus, the Technical Report could serve as an educational
       tool.

       The Technical Report could also provide focus for local volunteer groups (e.g., 400-12
       watershed planning groups and other local citizen groups) in establishing new project
       ideas. If these groups are also watershed partners, they may commit to specific high
       priority projects in the report.

       Some watershed partners (e.g., the Washington Department of Transportation, [WADOT]
       one of the permittees under the WQMA storm water general permits) is enthusiastic
       about alignment between highest priority environmental  issues  and funding.  For
       WADOT, however, their prioritization only includes issues for which they have
       responsibility.

       Joint prioritization of concerns by the watershed partners from a shared information
       platform should result in a shared vision and commitment to necessary steps of
       implementation. However, prioritization among a number of watershed partners greater
       effort than are usually allotted to the technical report.

       SSOs

       The Technical Report can assist local jurisdictions in focusing resources on the highest
       priority areas for corrective action because the  most sever problems will be documented.
       They will be able to align resources with priorities.

       The report may serve as a public education tool, informing the public about the relative
Information Management for the Watershed Approach in the Pacific Northwest                         4-23

-------
       occurrence of SSOs and their environmental priority.  The education and potential
       resulting activism may enhance the public will to fund corrective measures that would
       prevent future SSOs.

Implementation: Implementation can be tracked through watershed newsletters and information
that is available through the watershed information clearinghouse.  Draft permits issued for
storm water and CSO control could be posted, and public comment could be received through
the clearinghouse. The Technical Report and issued permit conditions will  also provide
reference points for tracking progress.

       CSOs

•      Draft municipal NPDES permits with CSO conditions could be posted on the information
       clearinghouse for public review and comment.

•      Re-issued NPDES permits containing requirements for CSO reductions and
       implementation of the nine minimum controls may be more readily accepted by the
       regulated utility because they were included in the partnered prioritization process and
       will understand the priority.

•      The information clearinghouse would be the format for status reports on CSO reductions,
       any permit-required monitoring results, and annual reports.

       STORM WATER

•      Permits, such as the Cedar/Green WQMA permit (Ecology 1995), issued on a WQMA
       basis offer a unique opportunity to demonstrate the utility of the information
       clearinghouse.  Currently, this permit is issued to each of the jurisdictions independently
       and does not rely on interjurisdictional cooperation. An information clearinghouse could
       provide a forum for jurisdictions to develop agreements that would facilitate permit
       effectiveness. For example, under the current Cedar/Green WQMA permit, each of the
       five permitees is required to analyze its storm water management program needs
       independently from the other permittees in the watershed. A shared information
       clearinghouse may  provide a forum for developing priorities across jurisdictional
       boundaries. King County is in the initial phases of developing a Regional Needs
       Assessment.  The assessment is examining prioritization of utility issues across
       jurisdictions, and also examining models for pooling funding to address top priority
       issues.

•      Draft WQMA storm water permits could be posted on the information clearinghouse for
       public review and comment.

•      Ecology could post a list of all of the NPDES industrial storm water permits on the
       clearinghouse.  Conditions  could be structured to maximize the implementation of BMPs
       across permitees on a simultaneous schedule.  Water quality monitoring before and
Watershed Academy Information Transfer Series, No. 6                                          4-24

-------
       following implementation could measure success.

       SSOs

•      Use of an information clearinghouse format for reporting instances of SSOs, information
       could provide real time data to Ecology and the public, simultaneously.

Conclusion: The Ecology WQMA process already incorporates wet weather programs because
these programs are part of the NPDES program.  The WQMA program does not currently serve
as a forum for watershed partners to develop a joint vision and strategies to accomplish pollution
control. Use of watershed clearinghouses can facilitate partnership development.  As
partnerships gain momentum, clearinghouses will be used even more effectively to enhance data
sharing, synergize monitoring efforts, provide greater access for the public to information
thereby enhancing involvement opportunities, and ultimately, focus resources more efficiently to
accomplish broader pollution control.
Information Management for the Watershed Approach in the Pacific Northwest                         4-25

-------
 SECTION 5. DEVELOPING WATERSHED INFORMATION CLEARINGHOUSES
Information management and communication support are key areas that could contribute to the
growth of the watershed approach and improve the effectiveness of existing partnerships in the
Pacific Northwest.  The level of interest and support for the clearinghouse concept is impressive.
The need for a universally accessible information source was identified in the interviews.  The
recognized need and support for the concept represent a service opportunity for agencies capable
of extending support to watersheds to assist the partners in establishing clearinghouses. The
following issues identified by project participants should be addressed in taking the next steps to
establish individual watershed information clearinghouses, and to build a more comprehensive
information management and communication support network for the watershed approach.

1)     Identifying Consensus Recommendations of Potential Clearinghouse Partners: This
       project was not a survey and its geographic focus was limited to Washington state.
       Region 10 may want to consider a survey of states to determine if the recommendation
       identified in this report is applicable to other states.  The survey could collect
       recommendations for alternative approaches to satisfy information management and
       communication support needs.

2)     Clearinghouse Boundaries:  Scaling and Nesting to Achieve Integrated Geographic
       Coverage: Boundaries that define the service areas of the watershed information
       clearinghouses need to be established. A consensus among watershed partners on
       boundaries would allow individual partners to begin forming the necessary agreements
       for the clearinghouse. Defining the hydrologic boundaries would also guide the process
       of indexing information to "nested" units ensuring integration of available information
       from individual projects. One suggestion was to conduct a survey or workshop for the
       purpose of building a consensus response to this question.

3)     Designing Information Clearinghouses: Interview participants identified several areas
       in the  state that are prepared to begin  design work on the watershed information
       clearinghouse (e.g., Nooksack). Figure C-2 (in Appendix C) identifies a seven-step
       method for developing an information management and communication support system.
       Pilot projects could be sponsored in a few locations to determine if a consistent design is
       possible for the clearinghouse.

4)     Identifying Charter Issues:  It would be useful to prepare an information resource
       document describing solutions to forming organizational units (such as private non-profit
       organizations) for the clearinghouse.  The document would address issues such as shared
       funding, information management policies, and board structure and function, to name just
       a few.

5)     Supporting and Tracking the Progress of Pilot Clearinghouses: The Yakima
Information Management for the Watershed Approach in the Pacific Northwest                          5-1

-------
       watershed clearinghouse will begin to set up its operations over the next several months.
       Tracking its progress, EPA could identify critical needs and determine if there are
       mechanisms in place to provide the necessary support. With support, it would be
       possible to fund a periodic evaluation to determine how successful the clearinghouse is in
       meeting Yakima watershed partners' information management and communication needs.

6)     Extending the Clearinghouse in a Use Analysis: It would be useful to develop a model
       for use in the designated service areas (e.g., WQMAs) to determine the need, support,
       and critical functions of the proposed information clearinghouse. The WQMA watershed
       clearinghouse use analysis could address more topics and in greater detail than is possible
       in this project report. Example categories for the extended WQMA watershed
       clearinghouse use analysis are listed below:

        •     Identify the potential watershed clearinghouse constituency

        •     Collect recommendations for a  clearinghouse mandate or charter

        •     Identify the monitoring and information collection activities of clearinghouse
              partners

        •     Describe the assessment objectives and methods of clearinghouse partners

        •     Describe the process used by individual partners to establish watershed priorities
              and describe the focus for priorities

        •     Evaluate the management strategy capabilities of watershed partners

        •     Define the products and services produced by watershed partners

        •     Assess the implementation capabilities of watershed partners

       The use analysis report could be circulated among potential clearinghouse partners prior
       to convening a workshop to establish a clearinghouse. The report would provide
       background information on design questions to be addressed at the workshop.
Watershed Academy Information Transfer Series, No. 6                                            5-2

-------
                                    REFERENCES



Chapter 90.54 of the Revised Code of Washington (RCW). Water Resources Act of 1971.

Chapter 90.44 RCW. Regulation of Public Groundwaters

Chapter 90.48 RCW. Water Pollution Control.

Chapter 90.03 RCW. Water Code.

Chapter 173-245 WAC.  Submission of Plans and Reports for Construction and Operation of
       Combined Sewer Overflow Reduction Facilities.

Chapter 173 -500 WAC.  Water Resources Management Program Established Pursuant to the  Water
       Resources Act of 1971.

Chapter 400-12 WAC.  Local Planning and Management of Nonpoint Source Pollution.

National Marine Fisheries Service.  1995. Making Endangered Species Act Determinations of Effect
       for Individual or Grouped Actions at the Watershed Scale.  The National Marine Fisheries
       Service, Environmental & Technical Services Division, Habitat Conservation Branch.

Puget Sound Water Quality Authority. 1987. Puget Sound Water Quality Management Plan. Puget
       Sound Water Quality Authority.  Revised. 1994.

Puget Sound Water Quality Action Team. 1996. Puget Sound Local Watershed Rankings under the
       Puget Sound Water Quality Management Plan and WAC Chapter 400-12. Puget Sound Water
       Quality Action Team (Unpublished).  July 1996.

Soil Conservation Service.  1992a. A Productive Nation in Harmony with a Quality Environment, Soil
       Conservation Service Strategic Initiatives for the 1990's. U.S. Department of Agriculture Soil
       Conservation Service.  April 1992.

Soil Conservation Service.  1992b.  Small Watershed Projects.  U.S. Department of Agriculture, Soil
       Conservation Service.  Program Aid Number 1354. Revised April 1992.

US Environmental Protection Agency.  1995.  Combined Sewer Overflows, Guidance for Nine
       Minimum Controls. U.S. Environmental Protection Agency, Office of Water. May 1995. EPA
       832-B-95-003.

US Environmental Protection Agency. 1997.  Designing an information management system for
       watersheds. EPA841-R-97-005. Office of Water (4503F), United States Environmental
       Protection Agency, Washington, DC.

US Fish and Wildlife Service.  1996.  Biological Assessment Preparation and Review.  A Workshop

-------
       Sponsored by  the U.S. Fish & Wildlife Service, Resources Northwest, Inc., and  The
       Washington Chapter of the Wildlife Society.  March 10, 1993, The Inn at Semiahmoo,
       Washington.

US Fish and Wildlife Service, n.d.  What's all this stuff about "Habitat Conservation Planning" and
       "Incidental Take Permits" in Pacific Northwest Forests? U.S. Department of the Interior, Fish
       and Wildlife Service, Region 1.

US Fish and Wildlife  Service/National Marine Fisheries Service. 1995.  No Surprises: Assuring
       Certainty for Private Landowners in Endangered Species Act Habitat Conservation Planning.
       Joint FWS/NMFS "No Surprises" Policy.

Washington State Dept. of Ecology. 1995.  National Pollutant Elimination System and State
       Waste Discharge General Permit for Discharges from Municipal Separate Storm Sewers for the
       Cedar/Green Water Quality Management Area  and the portion  of Kitsap Water Quality
       Management Area located in King County. Issued July 5,  1995.

Washington State Dept. of Ecology.  1992.  Stormwater Management Manual for the Puget Sound
       Basin (The Technical Manual). Washington State Department of Ecology. February 1992.
       Publication No. 91-75.

Washington State Dept. of Natural Resources. 1995. Watershed Analysis: Background and Current
       Information.  Washington State Department of Natural Resources.  Printed 4/26/95.

Washington Forest Practices Board. 1995.  Standard Methodology for Conducting Watershed
       Analysis Under Chapter 222-22 WAC.  Version 3.0.   Washington Forest Practices Board
       (WFPB).  Nov. 1995.

Washington Watershed Coordination Council. 1996.  Minutes of July 25,  1996 meeting of the
       Washington Watershed Coordination Council,  Memorandum from Bob Nichols,   with
       attachment:  Washington Watershed Coordination Council Revised Charter (1996).

-------