2012 GREEN INFRASTRUCTURE TECHNICAL ASSISTANCE PROGRAM

                               City of Dallas

                               Dallas, Texas
   Green Infrastructure Barriers and Opportunities in

   Dallas, Texas

   An Evaluation of Local Codes, Ordinances, and Guidance
   Photo: North Texas Green Council
                                                  January 2014
                                                EPA 800-R-14-006

-------
About the Green Infrastructure Technical Assistance Program

Stormwater runoff is a major cause of water pollution in urban areas. When rain falls in undeveloped
areas, the water is absorbed and filtered by soil and plants. When rain falls on our roofs, streets, and
parking lots, however, the water cannot soak into the ground. In most urban areas, stormwater is
drained through engineered collection systems and discharged into nearby waterbodies. The
stormwater carries trash, bacteria, heavy metals, and other pollutants from the urban landscape,
polluting the receiving waters. Higher flows also can cause erosion and flooding in urban streams,
damaging habitat, property, and infrastructure.

Green infrastructure uses vegetation, soils, and natural processes to manage water and create healthier
urban environments. At the scale of a city or county,  green infrastructure refers to the patchwork of
natural areas that provides habitat, flood protection, cleaner air, and cleaner water. At the scale of a
neighborhood or site, green infrastructure refers to stormwater management systems that mimic
nature by soaking up and storing water. These neighborhood or site-scale green infrastructure
approaches are often referred to as  low impact development.

EPA encourages the  use of green infrastructure to help manage stormwater runoff. In April 2011, EPA
renewed its commitment to green infrastructure with the release of the Strategic Agenda to Protect
Waters and Build More Livable Communities through Green Infrastructure. The agenda identifies
technical assistance  as a  key activity that EPA will pursue to accelerate the implementation of green
infrastructure.

In February 2012, EPA announced the availability of $950,000 in technical assistance to communities
working to  overcome common barriers to green infrastructure. EPA received letters of interest from
over 150 communities across the country, and selected 17 of these communities to receive technical
assistance.  Selected  communities received assistance with a range of projects aimed at addressing
common barriers to  green infrastructure, including code review, green infrastructure design,  and cost-
benefit assessments. The City of Dallas was selected to receive assistance identifying green
infrastructure barriers and opportunities.

For more information, visit http://water.epa.gov/infrastructure/greeninfrastructure/gi  support.cfm.

-------
Acknowledgements
Principal USEPA Staff
Suzanna Perea, EPA Region 6
Tamara Mittman, USEPA
Christopher Kloss, USEPA
James Pittman, USEPA
Community Team
Susan Alvarez, City of Dallas Trinity Watershed Management Department
Dorcy Clark, City of Dallas Trinity Watershed Management Department
Consultant Team
Christy Williams, Tetra Tech
Brad Wardynski, Tetra Tech
February 5, 2013 City of Dallas Green Infrastructure Charrette
David Schleg, Strategic Planning
Kristina Tippie, Trinity Watershed Management Department
Jennifer Cottingham, Trinity Watershed Management Department
Bert Vandenberg, City Attorney's Office
Art Torres, Department of Water Utilities
Rick Galceran, Public Works Department
Alan Hendrix, Public Works Department
LuisTamayo, Sustainable Development and Construction Department
Philip Erwin, Sustainable Development and Construction Department
Kevin Lefebvre, Office of Environmental Quality
Henry Nguyen, Public Works Department
Keith Manoy, Public Works Department, Transportation Planning
David Whitley, City Design Studio
Bonnie Meeder, Real Estate
Stefan Kesler, Public Works Department
Lloyd Denman, Sustainable Development and Construction Department
Peer Chacko, Sustainable Development and Construction Department
Zaida Basora, Public Works Department, Facilities
Phil Sikes, Sustainable Development and Construction Department
Tanya Brooks, Public Works Department, Transportation Planning
This report was developed under EPA Contract No. EP-C-11-009 as part of the 2012 EPA Green
Infrastructure Technical Assistance Program.

-------
Contents

Project Summary	1
Approach	2
  Document Review	2
     Goal #1    Minimize effective or connected impervious area	3
     Goal #2    Preserve and enhance the hydrologic function of unpaved areas	4
     Goal #3    Harvest rainwater to enhance potable and nonpotable water supply	4
     Goal #4    Allow and encourage the use of multi-use stormwater controls	4
     Goal #5    Manage stormwater to sustain stream functions	5
  Determination of Key Barriers	5
     Key Barrier No.  1	5
     Key Barrier No.  2	5
     Key Barrier No.  3	5
     Key Barrier No.  4	5
     Key Barrier No.  5	5
     Key Barrier No.  6	5
  Determination of Action Items	6
     Key Barrier No.  1	6
     Key Barrier No.  2	10
     Key Barrier No.  3	11
     Key Barrier No.  4	12
     Key Barrier No.  5	14
     Key Barrier No.  6	16
Conclusions	17

Tables

Table 1. Key Barrier No. 1 Action  Items and Entities Responsible	8
Table 2. Key Barrier No. 2 Action  Items and Entities Responsible	10
Table 3. Key Barrier No. 3 Action  Items and Entities Responsible	11
Table 4. Key Barrier No. 4 Action  Items and Entities Responsible	12
Table 5. Key Barrier No. 5 Action  Items and Entities Responsible	14
                                              IV

-------
Project Summary
The City of Dallas (City) is actively promoting sustainable building and development practices that
improve air quality, protect the climate, preserve water resources, and protect public health. The City
maintains a long-term goal of becoming carbon-neutral by 2030. In an effort to reach this long-term
goal, Dallas is among the first major cities in the U.S. to adopt a comprehensive green building standard
for all residential and commercial construction
(http://www.greendallas.net/pdfs/Green Building Ordinance.pdf). The City's green building program
regulates new construction for both residential and commercial projects, and  includes requirements for
energy efficiency, water conservation and cool roofs. The City also promotes development that
enhances water quality and preserves natural features by encouraging developers to use the North
Central Texas Council of Governments (NCTCOG) integrated stormwater management (iSWM) manual
when developing parcels larger than three acres. In December 2009, the Dallas City Council approved
the use of the Regional iSWM Manual (available at http://iswm.nctcog.org/). Currently the City of Dallas
local provisions of the iSWM  Manual (available at
http://clients.freese.com/dallas/documents/iswm/Dallas%20iSWM%20Criteria%20Manual%206-28-
10.pdf) are voluntary and have not been approved by City Council.

Additionally, the City is working with other North Texas cities through the NCTCOG to develop and
implement a plan to address  bacteria in watersheds throughout the region. Many of the City's
waterbodies have bacteria levels that exceed water quality standards, and monitoring indicates that
stormwater is often the primary source. By reducing and treating stormwater  discharges, green
infrastructure can play a  significant role in restoring bacteria-impaired waters. Green infrastructure can
also play a significant role in meeting the City's sustainability goals. Given its emphasis on preserving
natural features, minimizing impervious surfaces, and utilizing stormwater runoff, green infrastructure
can contribute to carbon sequestration, energy efficiency, water conservation, and heat island
mitigation. These environmental and economic benefits, along with the requirement in the City's MS4
Permit to implement post-construction stormwater controls, drives the City's commitment to green
infrastructure. The City recognizes green infrastructure as an important tool to be used in the
Infrastructure Plan, the Stormwater Management Plan for the City, and several other local planning
initiatives.

The City has invested considerable resources into the development of various  design manuals that
outline specifications and standard construction details for select green infrastructure practices.  Each of
the manuals was written by a different department or combination of city departments (Sustainable
Development and Construction, Public Works, Parks and Recreation, and Dallas Water Utilities), and all
address the issues of infrastructure, streets and site development. However, the manuals do not work
well together. As a result, the City's  current regulatory framework fails to streamline the process of
promoting green construction and green infrastructure, and in some cases even impedes development.

As part of its commitment to implement green infrastructure, the City applied for U.S. Environmental
Protection Agency (EPA) technical assistance to review the City's plans, policies, and codes to  identify
current practices that either support or present barriers to green infrastructure to assist the City  in
achieving its 2030 goals.  Based on this review, the City and EPA developed a list of key barriers and
inconsistencies to discuss at a charrette that was held on February 5, 2013. This report describes the
code review and charrette  processes and presents key findings from the reviews of the City's plans,
policies and codes with a summary of the action items that the City could implement.

-------
This report will assist other municipalities with recognizing barriers and inconsistencies in municipal
codes and ordinances which may be impeding the implementation of green infrastructure practices in
their communities. Further, the resources provided in this report will help communities begin to
develop helpful tools to make implementation easier.  The Approach and Document Review sections of
this report provide a summary of the review methodology used and the documents reviewed during the
evaluation.
This project included two phases—document review and determination of action items to address key
inconsistencies and barriers. The document review identified existing City plans, codes and policies that
support green infrastructure implementation. The review also identified language and provisions that
actively limit or prevent the use of green infrastructure, create ambiguity that could discourage or
prevent its use, or have omissions that, if remedied, could better promote the use of green
infrastructure. This evaluation also included a detailed review of the stormwater management practice
designs specifications included in the iSWM Criteria and Design Manual for Site Development and
Construction and the Complete Streets Design Manual. The approach for each phase of the project is
described below.

Document Review

Prior to conducting the code review, EPA worked with the City to identify the following codes,
ordinances, standards, guidelines, and plans that could have bearing on green infrastructure
implementation and should be subject to review:

    •   Green Building Ordinance No. 122428 (i.e., Dallas Green Construction provisions)
    •   Water Conservation Ordinance
    •   Landscape and Tree Preservation Ordinance (and revisions proposed by the Urban Forest
       Advisory Committee)
    •   Dallas Development Code
    •   City of Dallas iSWM Criteria and Design Manual for Site Development and Construction (iSWM
       Manual)
    •   Tax Increment Financing (TIF) District Design Manual
    •   City of Dallas Complete Streets Design Manual
    •   Dallas Development Guide
    •   Off-Street Parking and Driveways Handbook

In addition, EPA reviewed the following documents—as a whole or in part—to determine details
necessary to identify typical inconsistencies and barriers or to review documents included by reference
in the above.

    •   ForwardDallas! Comprehensive Land  Use Plan
    •   Dallas Bike Plan
    •   Downtown Dallas 360
    •   Renaissance Plan
    •   Thoroughfare Plan
    •   Dallas Fire Code
    •   Dallas Plumbing Code

-------
    •   Dallas Building Code
    •   Dallas Residential Code
    •   Paving Design Manual
    •   Drainage Design Manual
    •   Green Built Texas Construction Protocol
    •   USDGCLEED
    •   NAHB National Green Building Standard
    •   Environments For Living

To review relevant sections of the documents, EPA used two green infrastructure code and policy
evaluation tools: Tetra Tech's Green Infrastructure Opportunity Checklist Tool and the EPA Water Quality
Scorecard1. EPA used the tools to understand and describe where the City of Dallas' land development
regulations and other ordinances, policies and guidance documents might present barriers to or
opportunities for implementing a comprehensive green infrastructure approach. The evaluation also
included a detailed review of the stormwater management practice design specifications included in the
City of Dallas local provisions of the iSWM Criteria and Design Manual for Site Development and
Construction and the Complete Streets Manual.

The five goals that comprise the Green Infrastructure Opportunity Checklist Tool were used to organize
and report findings. The  section  below discusses the rationale for each goal, and summarizes several key
strategies for achieving the goal:

Goal #1    Minimize effective or connected impervious area
Disconnecting impervious cover can mitigate water quality impacts by allowing for infiltration and
reducing the velocity and volume of surface runoff. This goal can be achieved at the watershed,
neighborhood and site scale.

Municipalities can realize a significant reduction in regional runoff if they take advantage of underused
properties, such as infill, brownfield or greyfield sites. Redeveloping already degraded sites such as
abandoned shopping centers or underutilized parking lots rather than paving greenfield sites for new
development can dramatically reduce total impervious area while allowing communities to experience
the benefits and opportunities associated with growth. Sewer and water authorities can play a  major
role in directing a region's growth by determining when and where new infrastructure investment will
occur and where imperviousness already exists. Well-drafted facility planning areas can direct growth by
providing sewer service in areas least likely to impact water resources.

Mixed-use developments allow for the co-locating of land uses, which decreases impervious surfaces
associated with parking and decreases vehicle miles traveled—resulting in a reduction of hydrocarbons
left on roadways and reduced air deposition. Transit-oriented development (TOD) produces water
quality benefits by reducing:  (1) land consumption due to smaller site footprints; (2) parking spaces and
the impervious cover associated with them; and (3) average vehicle miles traveled, which, in turn,
reduces deposition of air pollution into waterbodies.

The width of travel lanes, parking lanes and sidewalks should be tailored to the urban setting. Where
appropriate, narrowing travel lane width to 10-11 feet, rather than the standard 12-13 feet, can
1 The EPA Water Quality Scorecard is also available at
http://www.epa.gov/smartgrowth/pdf/2009  1208  wq scorecard.pdf.

-------
significantly reduce the total amount of impervious surfaces. Such streets can also substantially improve
conditions for walking, biking and transit use, which reduces automobile use and overall demand for
parking spaces. Off-street parking and driveways contribute significantly to the impervious areas on a
residential lot. Therefore, reducing such dimensions can minimize the amount of stormwater runoff
from a site and improve water quality. Streets, sidewalks, and other hard surfaces contribute a large
portion to a municipality's total imperviousness. Making these impervious surfaces more permeable
protects water quality, reduces flooding, and can recharge groundwater.

Inflexible parking requirements that do not allow for alternative approaches, as well as standards that
require too much parking for specific uses, increase the amount of impervious surface in a development.
Oversupplying parking in a development also encourages greater vehicle use and detracts from the
overall pedestrian environment.  Incentives such as transit passes, vanpool arrangements, flexible work
schedules, market-priced facilities,  and separate leasing for spaces in apartments and condominiums
have quantifiable impacts on parking demand. Incorporating these incentives into parking requirements
creates the opportunity to meet  demand with less impervious cover. Parking lots generate a large
amount of impervious cover. Requiring landscaping reduces the environmental impact of parking and
can provide additional community benefits by providing shade and, if appropriately placed, creating
natural barriers between pedestrians and cars.

Goal #2   Preserve and enhance the hydrologic function of unpaved areas
Protection of significant tracts of critical lands and wildlife habitat aids in protecting and improving
water quality by increasing infiltration and groundwater recharge, preventing erosion and
contamination of ground water and surface water resources, and protecting sources of drinking water.
Within individual development tracts, effective tools for reducing pollutant loads and hydrologic impacts
(e.g. increases in peak flows) include protecting sensitive areas (e.g., wetlands, riparian areas,
floodplains, erosive soils, and steep slopes) and minimizing the footprint of buildings and construction
activity disturbance. These tools  have the added benefit of improving rainwater infiltration and
replenishing groundwater. Finally, protecting source water areas through land use controls and
stewardship activities will help safeguard community health, reduce the risk of water supply
contamination, and potentially reduce water treatment costs.

Goal #3   Harvest rainwater to enhance potable and nonpotable water supply
Downspout disconnection/redirection, rain barrels and cisterns can be used for outdoor water supply
purposes such as irrigation and indoor uses such as toilet flushing. Such stormwater reuse not only
enhances a community's efforts to  conserve and augment its water supply, but can also reduce
stormwater pollution and volume impacts. Communities often can strengthen opportunities for
rainwater harvesting through plumbing code and building code revisions.

Goal #4   Allow and encourage the use of multi-use stormwater controls
Green infrastructure stormwater controls are more likely to be employed by developers if the code
allows such BMPsto be located in required open space, recreation, landscaped, and right-of-way areas,
and if the BMPs receive credit for such requirements.  Allowing these areas to be used for multiple
benefits (e.g. landscaping and stormwater retention) may provide incentives for developers to
implement green infrastructure practices. Open space areas contribute little to stormwater loads and
can provide large areas to infiltrate and treat stormwater. Urban tree canopy - for example along
streets or within off-street parking - can improve water quality while also providing shade, reducing the
urban heat  island effect, and improving air quality. Greenways can provide community connectivity and

-------
healthy recreation, as well as water quality benefits. Parks can provide active and passive recreational
facilities and accommodate green infrastructure BMPs.

Goal #5   Manage stormwater to sustain stream functions
Green infrastructure approaches are more effective and cost-efficient than conventional stormwater
management practices in many instances.  Pre-site plan review is an effective tool for discussing with
developers alternative approaches to meet stormwater requirements and incorporating green
infrastructure techniques into new projects early in the design stage, well before construction begins.
The sooner in the process green infrastructure is considered, the easier it is to ensure that multiple
benefits are achieved in a cost-effective manner.  Design standards should be in place that replicate the
predevelopment hydrology of the site (to the extent practicable), maintain the water quality functions
of the watershed, and minimize channel erosion and downstream flooding. Monitoring, tracking, and
maintenance measures will help ensure that  practices remain in proper working condition to provide
the performance required by the stormwater ordinance. In some cases, it is impracticable or infeasible
to meet all stormwater standards on site. In such instances, alternative means of compliance should be
provided (e.g., contributing to off-site mitigation projects or off-site stormwater management facilities,
preferably green infrastructure facilities).

The inconsistencies and barriers identified during the review of the City's plans, policies, and codes were
summarized in a memo submitted to the city on January 4, 2013. The City provided corrections to these
findings on February 15,  2013, and these corrections have been incorporated into the summary of
findings.  The Key Barriers described below formed the basis of the discussion at the City charrette.

Determination  of Key Barriers

EPA and the City reviewed the evaluation findings and developed a list of six key barriers that were the
most critical to address, as follows:

Key Barrier No.  I   Green infrastructure elements are inconsistently or inadequately addressed in
                     multiple guidance documents and portions of the Dallas City Code

Key Barrier No. 2   The Dallas City  Code  currently inhibits effective land utilization  to achieve
                     multiple benefits

Key Barrier No. 3   The Dallas City  Code  lacks incentives to promote green infrastructure

Key Barrier No. 4   Current post-construction performance standards could be amended to further
                     promote the goals of green infrastructure

Key Barrier No. 5   Neither maintenance agreements nor inspection requirements currently apply
                     to green infrastructure measures

Key Barrier No. 6   City does  not allow for alternative measures or off-site mitigation of stormwater
                     impacts when on-site is infeasible

The purpose of the charrette on February 5, 2013, was to discuss the six key barriers and review
individual inconsistencies and barriers identified during the document review. The discrete findings
associated with each key barrier were compiled and provided as a handout during the charrette to
provide the basis for discussions.

-------
The charrette was moderated by EPA with the following City and EPA staff attending:

    •   David Schleg, Strategic Planning
    •   Kristina Tippie, Trinity Watershed Management Department
    •   Susan Alvarez, Trinity Watershed Management Department
    •   Dorcy Clark, Trinity Watershed Management Department
    •   Jennifer Cottingham, Trinity Watershed Management Department
    •   Bert Vandenberg, City Attorney's Office
    •   Art Torres, Department of Water Utilities
    •   Rick Galceran, Public Works Department
    •   Alan Hendrix, Public Works Department
    •   Luis Tamayo, Sustainable Development and Construction Department
    •   Philip Erwin, Sustainable Development and Construction Department
    •   Kevin Lefebvre, Office of Environmental Quality
    •   Henry Nguyen, Public Works Department
    •   Keith Manoy, Public Works Department, Transportation Planning
    •   David Whitley,  City Design Studio
    •   Bonnie Meeder, Real Estate
    •   Stefan Kesler, Public Works Department
    •   Lloyd Denman, Sustainable Development and Construction Department
    •   Peer Chacko, Sustainable Development and Construction Department
    •   Zaida Basora, Public Works Department, Facilities
    •   Phil Sikes, Sustainable Development and Construction Department
    •   Tanya Brooks, Public Works Department, Transportation Planning
    •   Suzanna Perea, EPA Region VI
    •   Christy Williams, EPA Contractor
    •   Brad Wardynski, EPA Contractor

Determination of Action Items

During the moderated discussion, participants discussed possible actions necessary to begin eliminating
the key barriers. These actions were documented at the charrette and are summarized below in Tables
1-5. The tables include resources or reference documents that  might be useful to the City when
implementing the described action items.

Key Barrier No. I    Green infrastructure elements are inconsistently or inadequately
                     addressed in multiple guidance documents and portions of the Code

The group discussed this barrier at length. It was agreed that currently, the two drivers with the greatest
potential to require, promote and support the implementation  of green  infrastructure are the Dallas
Green Construction provisions (DGC) in the Dallas City Code and the local iSWM provisions. However,
the group acknowledged confusion regarding when each driver would apply, when in the development
process each driver would be addressed, and who would be charged with ensuring their respective
requirements are addressed. The group indicated that if staff are unclear about the practical
applications of the DGC and iSWM, this represented a clear barrier to developers implementing the
provisions. The following inconsistencies were discussed,  including those previously identified during the
document review and others expressed during the charrette:

-------
iSWM
DGC
       The iSWM local provisions currently are voluntary; however, the City's MS4 permit indicates
       that the within one year of permit issuance the City is required to implement a comprehensive
       master planning process to develop, implement, and enforce controls to minimize the discharge
       of pollutants from areas of new development and significant redevelopment, after construction
       is completed, on all projects that disturb one acre or more of land, including projects less than
       one acre that are part of a larger common plan of development or sale that will results in the
       disturbance of one acre or more. 2
       The iSWM local provisions indicate that iSWM only would apply to development projects of
       three acres or larger, whereas the MS4 permit requires that the post-construction controls must
       apply to one acre or larger.
       The City currently is not implementing the incentives described in the local provisions of the
       iSWM Manual.
       If iSWM provisions are required by the City in the future, the regulatory flexibility inherent to
       Planned Development Districts could allow developers to avoid implementing the provisions in
       those Districts.
       Language in the City Code currently does not specifically define, permit or encourage green
       infrastructure as a means of stormwater management. Although the City encourages voluntary
       implementation of the iSWM program, it is unclear as to whether many practices would  be legal
       per specific requirements in the Dallas City Code (i.e., requirement for curb and gutter and
       subsurface storm sewers for stormwater conveyance).
       The DGC stormwater reuse and infiltration provisions (prescriptive requirements) included in
       Phase 2 for new residential construction are optional and would be available only to new
       residential proposed projects (of any size) to use in lieu of designing projects to LEED for Homes,
       ICC700, Green Built Texas or any equivalent green building standard.
       DGC stormwater reuse and infiltration provisions for new residential proposed projects included
       under an alternative compliance option (i.e. LEED for Homes, ICC700, GreenBuilt Texas) are
       optional and would be available only if the credits are pursued under any of the alternative
       standards.
       DGC stormwater reuse and infiltration provisions for new commercial proposed projects are
       optional and would be available only if the credits are pursued under any LEED for new
       construction rating system or other equivalent system or standard. No provisions are included
       in the Dallas Green Construction Code (Chapter 61)
       The DGC only applies to surface parking lots that are part of a new proposed project.
General
       The Development Guide currently does not include either iSWM or DGC development
       requirements. There is no other central location or resource for developers to get information
       about requirements pertaining to green infrastructure.
       Currently neither iSWM nor DGC are addressed during pre-development meetings.
       The types and locations of stormwater practices implemented per iSWM or the DGC are not
       being tracked currently.
2 Per Texas Pollutant Discharge Elimination System ("TPDES") Permit No. WQ0004396000 issued to the City in
October 2011.

-------
    •   Currently the DGC is separate from other parts of the Development Code, and iSWM is not
        codified. The group was unclear regarding how and where to codify iSWM and how to ensure
        consistency with existing stormwater-related regulations (i.e., drainage code, escarpment code)
        and the DGC.

Participants identified the actions necessary to initiate progress towards eliminating Key Barrier No. 1,
as summarized in Table 1.
Table 1. Key Barrier No. 1 Action Items and Entities Responsible
Item No.   Action
                                                                                Entities Collaborating/
                                                                                Responsible3
                                                                                TWM; iSWM TF


                                                                                TWM; PW;
                                                                                GB/iSWM/Green TF


                                                                                TWM;
                                                                                GB/iSWM/Green TF


                                                                                TWM; PW;
                                                                                GB/iSWM/Green TF
   1A      Make the iSWM local provisions mandatory and compliant with the federal
           post-construction threshold of one acre or larger and the City's MS4 permit.

   IB      Investigate either integrating the existing Green Building and iSWM Task
           Forces or reinvigorating the prior Green Task Force to develop streamlined
           approach to action items.
   1C      Determine how/where to authorize the City to begin requiring the local
           provisions included in the iSWM Manual, i.e., in the DGC, in the drainage
           code, in a separate "green infrastructure code," or in another code.

   ID      Better define iSWM and DGC requirements/options:
              •  Post-construction requirements which apply to new development and
                redevelopment
              •  Applicability thresholds - size, percent imperviousness, etc.
              •  Surface parking lot requirements
              •  Applicable post-construction BMP performance standards

   IE      Implement green infrastructure practice tracking system, either through the
           existing Building Department system or through another more appropriate
           system.

   IF      Determine how to educate and inform the developing public about green
           infrastructure options early in the design process in the context of the DGC,
           iSWM and other requirements/incentives.
a. TWM: Trinity Watershed Management Department; PW: Public Works Department; SDC: Sustainable Development and
Construction Department; iSWM TF: iSWM Task Force; GB TF: Green Building Task Force
                                                                                TWM; PW; SDC;
                                                                                GB/iSWM/Green TF


                                                                                TWM; PW;
                                                                                GB/iSWM/Green TF

-------
Resources to Address Key Barrier No. 1
NCTCOG iSWM Program Guidance
http://iswm.nctcog.org/program guidance.asp

Supporting documentation for the iSWM program discusses strategies for adoption and implementation of
iSWM. Included in the guidance is an example iSWM ordinance that could be used as a template by Dallas for
addressing Action Item 1A.
City of Houston Storm Water Quality Permit, Code of Ordinances (Ch. 47, Article XII)
http://library.municode.com/index.aspx?clientld=10123

The City of Houston has adopted a water quality permit process for new development and redevelopment that
could serve as example regulatory framework for addressing the action items associated with Key Barrier 1.
Specifically, Chapter 47, Article XII, provides example ordinance language associated with the requirement of
post-construction stormwater controls and addresses maintenance responsibilities.
City of Austin Environmental Criteria Manual
http://austintexas.gov/department/stormwater-management
Austin's development code cross-references the Environmental Criteria Manual, which provides a central
resource for environmental rules and regulations. By incorporating stormwater management rules into a
manual (instead of code), the document can be amended easily to maintain consistency and  be updated
continually on the basis of the current state of the science. This document also provides example language
defining post-construction performance standards.

San Antonio  Unified Development Code
http://www.sanantonio.gov/dsd/udc.asp
Although green infrastructure is not mandated by San Antonio's Unified Development Code,  the City clearly
states in Article V, Section 35-504, that it "encourages the installation of low impact development (LID) features
such as engineered swales, engineered infiltration storm sewer systems, bioretention, and engineered
wetlands." This promotional  language is an example of how municipalities can show the development
community that green infrastructure is an explicitly encouraged option.

Town of Huntersville, NC, LID Ordinance
ftp://ftpl.co.mecklenburg.nc.us/WaterQuality/PCO%20Ordinances/Huntersville%20Post-
Construction%20Ordinance%20FINAL.pdf

A dedicated LID ordinance is  another method to consolidate green infrastructure recommendations and
regulations into one central document. The Town of Huntersville adopted a  water quality ordinance that
specifically promotes and defines green infrastructure practices and stormwater management requirements.
The ordinance refers to an external water quality design manual for specific guidance.

-------
Key Barrier No. 2   The Code currently inhibits effective land utilization to achieve
                      multiple benefits

Many of the challenges and action items identified in the discussion of Key Barrier No. 1 apply to this
barrier as well. The group also discussed the revisions to the Landscape and Tree Preservation
Ordinance proposed by the Urban Forestry Advisory Committee and the Sustainable Development and
Construction Department and  how those changes could help address  Key Barrier No. 2 by allowing
green infrastructure practices to count towards landscaping requirements. Finally, the group discussed
the current draft of the Complete Streets Design Manual and how it could be revised to be more
supportive of green infrastructure.

Participants identified actions necessary to initiate progress towards eliminating Key Barrier No. 2, as
summarized in Table 2.

Table 2. Key Barrier No. 2 Action Items and Entities Responsible

                                                                              Entities
                                                                              Collaborating/
Item No.  Action                                                              Responsible3

   2A     Update and implement Landscape and Tree Preservation Ordinance with      TWM; DEV; Urban
          proposed revisions by Urban Forestry Advisory Committee.                  Forestry Advisory
                                                                              Committee

   2B     Incorporate additional language supportive of green infrastructure in the      DEV
          right-of-way throughout the Complete Streets Design Manual.
a. TWM: Trinity Watershed Management Department; DEV: Sustainable Development and Construction


  Resource to Address Key Barrier No. 2
  Arlington, Texas, LID Manual
  http://texaslid.org/pdfs/Arlington%20LID%20Guidance%20Manual.pdf
  The Arlington LID Manual provides regional guidance concerning green infrastructure implementation. Specific
  recommendations provided in this document, as well as in the iSWM program, should be considered when
  addressing Action Item 2B.
                                               10

-------
Key Barrier No. 3    The Code lacks incentives to promote green infrastructure

As previously noted, the City does not currently implement the incentives described in the local
provisions of the iSWM Manual. Although the Sustainable Development and Construction Department is
beginning to map imperviousness, site imperviousness is not a factor when calculating utility fees.  The
City is using digitized maps of imperviousness to support a utility fee study.

Participants identified the actions necessary to initiate progress towards eliminating Key Barrier No. 3,
as summarized in Table 3.

Table 3. Key Barrier No. 3 Action Items and Entities Responsible
Item No.
Action
   Entities
Collaborating/
 Responsible3
   3A      Include assessment of viability of green infrastructure incentives in currently    TWM
           planned utility fee study.

   3B      Explore off-site mitigation (other than the optional pollution prevention        TWM
           provision in iSWM) and fee-in-lieu  options as additional incentives.

   3C      Explore implications of implementing a "Green Tape" plan review process      TWM; DEV
           that could incentivize green infrastructure implementation.
a. TWM: Trinity Watershed Management Department; DEV: Sustainable Development and Construction
                                                 11

-------
Key Barrier No. 4
                       Current post-construction performance standards could be amended
                       to further promote the goals of green infrastructure
The group discussed this barrier with regard to how post-construction performance standards might
inhibit or deter development in the City if they were more stringent than those of the surrounding
municipalities (i.e. water-quality based, retention, infiltration). The EPA representatives indicated that
current Phase II NPDES MS4 requirements and potential requirements of the new post-construction
federal rulemaking make it unlikely that surrounding localities have or will continue to have less
stringent or prescriptive requirements.

As noted in the discussion of Key Barrier No. 1, staff participating in the charrette agreed to work toward
making the iSWM local provisions mandatory and compliant with the federal post-construction
threshold of one acre or larger and the City's MS4 permit. The iSWM provisions include post-
construction performance standards. In addition, participants developed and agreed upon the actions
necessary to initiate progress towards eliminating Key Barrier No. 4, as summarized in Table 4.

Table 4. Key Barrier No. 4 Action Items and Entities Responsible
Item No.
                                         Action
   Entities
Collaborating/
 Responsible3
                                                                               TWM; GB/iSWM
                                                                               TF/Green TF; DEV
   4A      Consider the development of a retention standard and address the following
           associated questions:
             •  What would the standard be?
             •  What would the threshold be?
             •  Would infiltration be a required or optional site design practice in
                iSWM?
             •  How would this standard relate to optional infiltration requirements in
                the DGC?
             •  Where would the requirement or option be codified or described?
   4B      Determine a process to ensure that public projects implement all required
           standards as well as applicable voluntary standards to serve as an example to
           the private development community and provide explicit examples of green
           infrastructure cost-effectiveness.
a.   TWM: Trinity Watershed Management Department; GB TF: Green Building Task Force; iSWM TF: iSWM Task Force;
    PW: Public Works Department; DEV: Sustainable Development and Construction; PARKS: Park and Recreation Department
b.   PARKS was not represented at the charrette however, their participation has been assumed for this action item per
    direction from City staff
                                                                               TWM; PW; PARKS
                                                12

-------
Resources to Address Key Barrier No. 4
USEPA NPDES Proposed National Rulemaking Considerations
http://cfpub.epa.gov/npdes/stormwater/rulemaking.cfm
EPA is involved currently in a national rulemaking process that will affect post-construction stormwater
management. Municipalities nationwide are planning ahead for pending rules by adopting post-construction
performance standards intended to mitigate urban hydrology to predevelopment conditions. These standards
tend to consist of on-site retention and/or reuse of runoff associated with a certain percentile storm event.
When addressing Action Item 4a and 4B, consideration should be given to national rulemaking activities that
may impact regulated municipalities as early as 2014.
Harris County Low Impact Development and Green Infrastructure Design Criteria for Storm Water
Management
http://www.hcfcd.org/dl  dcmanual.html
Although guidance in the Harris County  LID manual is not required currently for conventional development, it is
required when developers choose to implement an LID approach for site development. This document provides
a Texas-specific example of post-construction water quality standards and area thresholds (e.g., treatment of
the first inch of runoff for all sites greater than 1 acre).
Austin  Watershed Protection Draft Ordinance
http://austintexas.gov/page/watershed-protection-ordinance-0
The draft Watershed Protection Ordinance for the City of Austin was developed "to improve creek and
floodplain protection; prevent unsustainable public expense on drainage systems; simplify development
regulations where possible; and minimize the impact on the ability to develop land." As such, it is an example
of how stormwater-related code language can be consolidated in a single location. This ordinance defines post-
construction standards and refers to the Environmental Criteria Manual for guidance.
                                                13

-------
Key Barrier No. 5
Neither maintenance agreements nor inspection requirements
currently apply to green infrastructure measures
Currently the City does not track the location or condition of green infrastructure practices. Further, the
City does not inspect nor require the inspection of private practices. Charrette participants discussed
exploring other cities' requirements for private sector tracking, maintenance and inspection of green
infrastructure BMPs. Staff also indicated that field staff were not adequately trained to recognize green
infrastructure practices or know what maintenance was required.

Participants identified actions necessary to initiate progress towards eliminating Key Barrier No. 5, as
summarized in Table 5.

Table 5. Key Barrier No. 5 Action Items and Entities Responsible
Item No.
                  Action
   Entities
Collaborating/
 Responsible3
   5A      Implement practice-specific tracking system either into existing data tracking   TWM; SDC
           or with new system.
   5B      Develop template for maintenance agreement.                             TWM; SDC
   5C      Develop checklist(s) for green infrastructure practice maintenance            TWM; SDC
           requirements for common BMPs to be given to practice owners.
   5D      Explore other cities' requirements for tracking, maintenance and inspection     TWM
           of BMPs.
a. TWM: Trinity Watershed Management Department; DEV: Sustainable Development and Construction Department
                                                14

-------
Resources to Address Key Barrier No. 5

City of San Diego Capital Improvement Projects Tracking System
http://maps.sandiego.gov/cpm/default.aspx

The City of San Diego tracks green infrastructure projects using a spatial database. This is an example of a tracking system
that could be adopted to address action item 5A.

North Carolina Dept. of Environment and Natural Resources, Example BMP O&M Agreement
http://portal.ncdenr.0rg/c/document library/get file?uuid=7d81643b-b427-4dlc-9d57-4081d974f7a3&groupld=38364

This example operation and maintenance agreement can be used to address Action Items 5B and 5C.

Southeast Michigan Council of Governments LID Manual, Example Stormwater Management Practices Maintenance
Agreement
http://www.swmpc.org/downloads/lidmanual.pdf

This example operation and maintenance agreement can be used to address Action Item 5B and 5C.

City of Philadelphia Water Department Green Stormwater Infrastructure Project Map
http://phillywatersheds.org/biggreenmap

Similar to San  Diego, Philadelphia tracks green infrastructure projects spatially to raise public awareness and organize
maintenance efforts.

City of Philadelphia Water Department Green Infrastructure Maintenance  Manual Development Process Plan
http://phillvwatersheds.org/ltcpu/Green%20lnfrastructure%20Maintenance%20Manual%20Development%20Process%20PI
an.pdf

The process by which Philadelphia developed their green infrastructure maintenance manual provides an example
framework for Dallas to  address action items associated with Key Barrier 5.

Texas A&M AgriLife Extension & Research Center at Dallas—Recent trainings by field experts on bioretention and
permeable pavement
http://dallas.tamu.edu/

The local Texas A&M extension staff hosted workshops with field experts on Stormwater BMP design and maintenance. The
workshops present an opportunity to encourage city maintenance staff and  local engineers to learn the basics of BMP
function, operation, and maintenance. Other universities and entities nationwide host similar trainings and certification
programs, which could be used when addressing Action Item 5C to foster communication between the City of Dallas and
other municipalities currently maintaining green infrastructure practices.

City of Bellvue Washington Public and Private BMP Maintenance Checklist
http://www.scvurppp-w2k.com/bmp om forms.htm

The City provides checklists and tables of  maintenance  requirements for  private and public BMP maintenance.

King County, WA Maintenance Checklist and Tips for Inspection
http://www.kinDGCountv.gov/environment/waterandland/stormwater/documents/drainage-maintenance-
standards/checklist.aspx

University of New Hampshire Stormwater Center Maintenance Fact Sheets and Checklists
http://www.unh.edu/unhsc/specs-and-fact-sheets-0

The Stormwater Center provides fact sheets regarding the design and specification of various BMPs in addition to checklists
for use during maintenance.

Harris County Stormwater Quality Inspections Program
http://hcpid.org/permits/swqinsp welcome.html

The Compliance &  Environmental Inspectors Group of Harris  County's Architecture and Engineering include a team of storm
water inspectors who enforce the Texas Commission on Environmental Quality Construction General Permit and  Harris
County regulations as they relate to Post Construction and Stormwater Discharges Associated with Construction Activities.
                                                     15

-------
Key Barrier No. 6    City does not allow for alternative measures or off-site mitigation of
                       stormwater impacts when on-site is infeasible

Participants developed and agreed upon the actions necessary to initiate progress towards eliminating
Key Barrier No. 6 by implementing action items 3B and 3C discussed under Key Barrier No. 3, namely
that the City would explore both a fee-in-lieu program and additional off-site mitigation opportunities.


  Resources to Address Key Barrier No. 6
  EPA Study: Reducing Stormwater Costs through Low Impact Development Strategies and Practices
  http://water.epa.gov/polwaste/green/costs07  index.cfm
  This report provides information to  cities, counties, states, private-sector developers and others on the costs
  and benefits of using Low Impact Development (LID) strategies and practices to help protect and restore water
  quality. LID practices are innovative practices that manage stormwater close to its source by mimicking a site's
  predevelopment hydrology and use design techniques that infiltrate, evapotranspirate, and reuse runoff. LID
  practices are increasingly being used by communities across the country to help protect and restore water
  quality. This report provides information on the cost savings and benefits that can be achieved by
  implementing LID practices versus conventional stormwater practices.
  Banking on Green: How Green Infrastructure Saves Municipalities Money and Provides  Economic Benefits
  Community-wide
  http://www.asla.org/Content Detail. aspx?id=31301
  This report looks at the most cost-effective options for managing polluted runoff and protecting clean water,
  and finds that green infrastructure solutions save taxpayer money and provide community benefits by
  managing stormwater where it falls.
                                                 16

-------
Conclusions
The City of Dallas recognizes the importance of Green Infrastructure in addressing stormwater
management as well as other key issues for the City, such as conserving and protecting the water supply
and open space, creating more shade for bikeable and walkable streets, improving air quality, and
reducing the urban heat index. Further, the City's MS4 Permit, along with the environmental and
economic  benefits of green infrastructure, drives the commitment to these alternative stormwater
management techniques.

As discussed at the charrette, the City is undertaking many activities to support Green Infrastructure. For
example:

    •   The Green Building Code requires the consideration of infiltration practices on certain types of
       development projects and protects greenfields.
    •   The City's Comprehensive Plan, forwardDallas!, includes and supports most of the recognized
       green infrastructure goals and principles.
    •   Article X of the Development Code (Landscape and Tree Preservation Ordinance) and the
       revisions recommended by the Urban Forestry Advisory Committee include many recommended
       tree protections and planting requirements that support green infrastructure goals.
    •   The proposed system of awarding credit for Integrated Site Design Practices (LID; Option 1 of
       iSWM program) is in line with goals of green infrastructure implementation and allows more
       flexibility to developers. This is rarely credited to this level of detail (despite low impact site
       design accomplishing the same goals as installing structural BMPs).
    •   Enhanced swale guidance serves as a great  multi-benefit practice for the conditions in Dallas
       (e.g., fits into right-of-ways and can be used for both conveyance and treatment).
    •   The City's Thoroughfare Plan and Bike Plan  support alternative forms of transportation, which
       could reduce the demand for roadway infrastructure.
    •   The City was one of the sponsors of the LID Design Competition, which demonstrates an interest
       in  and commitment to green infrastructure principles.

However, the review process and charrette revealed several  key barriers to green infrastructure
implementation. Green infrastructure elements are inconsistently or inadequately addressed in
multiple guidance documents and portions of the Code and the  Code currently inhibits effective land
utilization  to achieve multiple benefits and lacks of incentives to promote green infrastructure.  In
addition, current post-construction performance standards could be amended to further promote the
goals of green infrastructure. Finally, neither maintenance agreements nor inspection requirements
currently apply to green infrastructure measures and the City does not allow for alternative measures or
off-site mitigation of stormwater impacts when on-site is infeasible.

During the charrette, City staff considered  each barrier and developed multiple action items designed to
eliminate the barrier. Generally, the action items involved implementing currently voluntary
stormwater requirements and clarifying sometimes seemingly contradictory requirements amongst key
codes. City staff indicated that better communication and coordination was necessary amongst
departments and that green infrastructure should be considered earlier in the development process.
Staff also indicated that updating the post-construction standard may be appropriate to include a
retention standard  or to reduce existing applicability thresholds. Several guidance documents need to
be updated to better clarify and  consolidate green infrastructure requirements and existing and
                                              17

-------
potentially new incentives for implementation of green infrastructure needs to be better advertised to
the developing public. Finally, City staff indicated that new tools to ensure that existing and newly
installed green infrastructure practices are operated and maintained properly are necessary.

As is clear from the process conducted at the charrette and the thoughtful action items that resulted,
the City is on the path to remove many of the key barriers that currently exist in the Dallas codes,
ordinances and guidance documents. These actions, once completed, can result in a greater level of
green infrastructure implementation in the future.
                                               18

-------