FY2010 National Report on
              Implementing Total Maximum  Daily Loads (TMDLs)
              US Environmental Protection Agency Office of Water, Washington DC
             Document No. EPA841-R-11-002, March 2011
Abstract

       This national study assessed the implementation of Total Maximum Daily Loads (TMDLs)
through the end of FY2010 by integrating multiple, independent EPA data systems through geospatial
analysis. The assessment targeted the implementation activities in which EPA is directly involved but did
not target all TMDL implementation activities. Point source (PS) TMDL implementation was evaluated in
terms of TMDLs whose NPDES permits meet their wasteload allocations, and nonpoint source (NPS)
TMDL implementation was evaluated in reference to TMDLs with Section 319 NPS control projects
involved in reducing nonpoint source loads. The assessed populations of PS TMDLs and NPS TMDLs both
included mixed (PS/NPS) TMDLs. The evaluation found that a total of 15,934 PS TMDLs (78% of all PS
TMDLs) had mapped data  available, and 2,671 (17%) of these had all data necessary to determine
implementation status.  Of these, 2,052 (77%) were PS TMDLs with all permits meeting the terms of the
TMDL, and 133 additional  TMDLs (5%) had some permits meeting with others not meeting TMDL terms.
Looking specifically at 9,703 permits associated with TMDLs,  9,225 permits or 95% were meeting the
terms of the TMDL wasteload allocation(s). The evaluation also found that a total of 30,702 NPS TMDLs
(78% of all  NPS TMDLs) had mapped data available, and 2,438 (8%) of these co-occurred with mapped
Section 319 projects.  The  majority of these NPS TMDLs with Section 319 projects (1,402 or 57%) had
reported direct involvement in a TMDL, whereas the remaining 1,036 (43%) had a Section 319 project
co-occurring with the TMDL on the same water but without a reported relationship to the TMDL.
Among the 1,402 TMDLs with reported linkages with Section 319 projects, the 319 project role in the
TMDL was as follows: 1,287 were implementing a TMDL, 82 were developing a TMDL, and 33 were
developing a TMDL implementation plan.  Looking specifically at Section 319 projects with TMDL status
tracked since 2002 by EPA, 2,729 projects (33%) reported TMDL involvement, and 1,953 (72%) of these
projects were implementing a TMDL. This study also analyzed the data gaps that limit the numbers of
TMDLs that could be assessed, and noted that EPA data systems that could track all TMDL
implementation nationwide are likely to remain prohibitively expensive and logistically infeasible. The
study concluded that the assessment methodology developed for this project is capable of producing
useful, documented TMDL implementation numbers that are substantial but, due to data limitations
that would be highly expensive to overcome, still represent an underestimate of total TMDL
implementation actually occurring.
Introduction and Background

       A Total Maximum Daily Load, or TMDL, is a calculation of the maximum amount of a pollutant
that a waterbody can receive and still meet water quality standards.  Under Section 303(d) of the Clean
Water Act (CWA), states, territories, and authorized tribes are required to develop lists of impaired
waters. These are waters that are too polluted or otherwise degraded to meet the water quality
standards set by states, territories, or authorized tribes (hereafter referred to as states, for brevity). The

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
law requires that these jurisdictions establish priority rankings for waters on the lists and develop TMDLs
for these waters. As of FY2010, EPA and states have developed more than 42,000 TMDLs. TMDLs are an
essential part of the CWA's strategy to attain its main goal, "to restore and maintain the chemical,
physical and biological integrity of the Nation's waters" (FWPCA,  1972).

       This report provides an analysis of TMDL implementation frequency as determined from EPA
data systems and state records. A TMDL provides a technical, quantitative plan that is an important step
toward reducing pollutants, but implementing pollution control practices consistent with the TMDL is
the follow-on action needed in order for waters to be restored. TMDL implementation broadly includes
any actions consistent with the TMDL that are taken to reduce the pollutant loads causing impairment.
Although a wide variety of actions might be carried out to reduce pollution, the two main types of TMDL
implementation actions are discharge permits to control point sources and a variety of management
practices to control nonpoint sources.

       There is great interest as well as frequent confusion regarding TMDL implementation roles and
responsibilities. Under the CWA, states are primarily responsible for developing and implementing
TMDLs.  EPA is required to review and approve or disapprove TMDLs developed and submitted by states
within 30 days. After EPA's approval of a TMDL, the Agency's statutory authority is limited and it is
largely the state's responsibility to implement the control  practices called for in the TMDL.
Nevertheless, EPA contributes support to TMDL implementation  in two major ways: 1)  Section 303(d)
of the CWA does not specifically require implementation plans for TMDLs; however, it requires that
wasteload  allocations (WLAs) to point sources be implemented through the  National Pollutant Discharge
Elimination System (NPDES) permit program. After a TMDL has been developed, water quality-based
discharge limits in  NPDES permits authorized under CWA Section 402 must be consistent with the
assumptions and requirements of the WLA; and 2) load allocations (LAs) are implemented to control
nonpoint sources through a wide variety of state, local, and federal programs (which may be regulatory,
non-regulatory, or incentive-based, depending on the program), as well as voluntary action by  citizens.
CWA Section 319 establishes EPA's nonpoint source management program.  As part of this program,
states receive grant money, and often pass the funding along to counties and other local groups to
support a variety of activities for managing nonpoint sources.

       EPA, states and others share a keen interest in knowing the frequency of TMDL implementation.
However, many obstacles to comprehensive TMDL implementation tracking exist, including: workload
to track TMDLs due to the large numbers of TMDLs;  limited state reporting requirements relating TMDLs
to NPDES permits; the decentralized nature of nonpoint source control practitioners and practices, and
the lack of any centralized reporting on implementation; and the expense and logistical challenges of
developing databases that could be queried on TMDL implementation. Furthermore, many TMDL
implementation actions (such as permits other than NPDES, or nonpoint source controls funded by
USDA or state programs)  have little or nothing to do with EPA. EPA has no authority to require TMDL
implementation tracking and reporting. Developing and managing a comprehensive TMDL
implementation database has been estimated to cost tens of millions of dollars annually. Insights about
TMDL implementation rates have therefore been gained through sample-based studies, anecdotal
information, and professional judgment.  Although a full census of implementation remains infeasible,
improvements to EPA data systems have recently enabled new annual and national approaches to
estimating TMDL implementation.

       During 2007, the  EPA Office of Inspector General (DIG) Program Evaluation Division reviewed
the TMDL Program in EPA's Office of Water (OW) and issued a final report (see Total Maximum Daily

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011


Load Program Needs Better Data and Measures to Demonstrate Environmental Results;  Report No.
2007-P-00036  Date Issued: 09/19/2007).  The report contained seven recommendations. In the
following months, OW developed and finalized a Corrective Actions Plan identifying specific actions and
a schedule for addressing the DIG review. OW's Plan included 31 actions to address the DIG report's 7
recommendations.

       The TMDL program review included one recommendation concerning TMDL implementation
reporting metrics (OIG, 2007). The three metrics of DIG recommendation 2 were:

Demonstrate that TMDLs are being implemented by annually reporting on the progress of TMDL
implementation activities completed nationwide including the number of TMDLs:

       [l]-that have all wasteload allocations (WLAs) incorporated into NPDES permits,

       [2]-that have implemented load allocations through at least one BMP funded through the
       Section 319 Program, and

       [3]-for which implementation data are not available to EPA.

       Several action items were proposed in response to this recommendation. One action was:

Action #31 - Complete national sample-based assessment of TMDL implementation rates

       Although a national survey of the complexities of TMDL implementation would be  very
expensive and time-consuming (estimated cost at over $ 700K and requiring an Information Collection
Request that involves a year-long procedure before the survey can begin), this action was appropriate
when written as the only method available to obtain national figures on TMDL implementation.  Data
system improvements since 2007 have made it possible to assess TMDL implementation using national
geospatial datasets and previously uncollected permit and Section 319 project data in new ways.  Based
on this change, the original corrective action was replaced by revised Action #31 as follows:

Action #31 - Beginning with FY2010, produce a national end-of-FY annual report on the number of
TMDLs implementing WLAs in NPDES permits, the number of TMDLs implementing LAs through CWA
Section 319 projects, and the number of TMDLs with data gaps relative to implementation tracking.

       This technical report provides the results of assessing TMDL Implementation through the end of
FY2010. To develop this report, the TMDL program assessed all three of the implementation metrics in
recommendation 2 using a primarily GIS-based and query-augmented analysis of multiple EPA data
systems including TMDL, NPS, and permits databases. The first two parts of the results section focus on
the population of PS-related TMDLs and the population of NPS-related TMDLs in order to address the
first two reporting metrics of recommendation 2, respectively. The third part of the results section
addresses unavailable data and the different ways that data gaps affect measured results for the PS and
NPS TMDLs.  This report also includes several additional metrics related to TMDL implementation that
were gathered as part of the TMDL Program Results Analysis Project (see also the Results Analysis
website at http://water.epa.gov/lawsregs/lawsguidance/cwa/tmdl/results index.cfm).

-------
     FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
The Target Population of Approved and Established TMDLs

       The number of TMDLs continues to increase, thus any statistics about TMDLs are limited by the
date of the study and the lag time involved in obtaining data. This study focused on and represented
the status of known TMDL implementation through September 2010.  Figure 1 (below) conceptually
represents the TMDL "universe" of 42,134 TMDLs developed through the end of FY2010 (EPA, 2011) and
the subset of 31,951 TMDLs that address impaired waters that have been mapped. Figure 1 also
illustrates the relative proportions of NPS,  PS, and NPS/PS (mixed) TMDLs, and their extensive overlap in
the case of mixed TMDLs. As recommendation 2 asks for separately reporting implementation status of
  Figure 1: TMDL "Universe" Quantified by TMDL Type and Data Source in 2010
  This Venn diagram shows the relationship of national numbers of approved/established TMDLs
  derived from the two primary sources in EPA data systems - the tabular records in ATTAINS
  and the geospatial representation of those records (in GIS map form). Mapping occurs after
  final tabular data are submitted, thus mapped totals are inevitably lower than ATTAINS totals.
  Nevertheless, NPS-related and PS-related mapped totals are 78% of NPS-related and PS-
  related ATTAINS totals.  A = NPS-only mapped TMDLs; B = PS/NPS (mixed) mapped TMDLs;
  C = PS-only mapped TMDLs; D = ATTAINS as-yet unmapped TMDLs (mostly recent).
  The universe of total mapped TMDLs is the appropriate universe within which to assess TMDL
  implementation because the lag time for mapping  allows a reasonable time period after TMDL
  approval for implementation to take place.
                                    D
NPS-related mapped TMDLs (30,702)
(A + B)

PS-related mapped TMDLs (15,934)
(B + C)

Total mapped TMDLs (31,951)
(A + B + C)

Total all ATTAINS TMDLs (42,134)
(A + B + C +  D)
PS and NPS TMDLs, the mixed TMDLs are a component of both the PS and NPS statistics.
Methods Development and Evaluation
       Because this study represented a first-time national scale analysis of TMDL implementation
from EPA's GIS and tabular data together, it explored several slightly different options for a
methodology.  Six alternative methods, three each for the PS and NPS components of the analysis, were
carried out to evaluate options.  Selection of the best PS and NPS analysis method was based on the
ability to identify implementation status for the greatest number of TMDLs accurately as well as

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
minimize and explain data gaps. All of these alternatives were carried out and generated national
results on TMDL implementation.  Quality control/quality assurance checks on the draft datasets
enabled the final method selection. The steps in each method appear in summary form below.

                    PS APPROACH 1: Permits/TMDLs datasets and GIS analysis

Analysis Summary: Identify permits with known permit WLA status from the annual national analysis
done under the Priority Permits Initiative.  Use the Permits GIS Dataset to identify these permits
geospatially.  Overlay the Permits GIS Dataset and the Waters with TMDLs GIS Dataset.  Use the Waters
with TMDLs GIS Dataset to obtain  unique TMDL IDs (i.e., the TMDL identifiers) for the Reach Codes
where permit WLA status information is available. Identify the LIST IDs (i.e., the impaired waters
segments) that relate to these TMDL IDs. Analyze LIST ID and TMDL POLLUTANT attribute information
referenced to the Waters with TMDLs GIS Dataset to identify the LIST ID/POLLUTANT combinations (i.e.,
TMDLs) associated with those waters.  Re-link these TMDLs with the known WLA status already analyzed
for each TMDL's permits. Compile results in terms of TMDLs with permits meeting all WLAs, TMDLs with
permits partly meeting WLAs, and TMDLs with permits not meeting WLAs.

                PS APPROACH 2: Permits/TMDLs datasets. GIS. and ATTAINS query

Analysis Summary: Identify permits with known permit WLA status from the annual national analysis
done under the Priority Permits Initiative.  Use the Permits GIS Dataset to identify these permits
geospatially.  Overlay the Permits GIS Dataset and the Waters with TMDLs GIS Dataset.  Use the Waters
with TMDLs GIS Dataset to obtain  unique TMDL IDs (i.e., the TMDL identifiers) for the Reach Codes
where permit WLA status information is available. Identify the LIST IDs (i.e., the impaired waters
segments) that relate to these TMDL IDs. Run an ATTAINS query to identify the LIST ID/POLLUTANT
combinations (i.e., TMDLs) associated with those LIST IDs. Re-link these TMDLs with the known WLA
status already analyzed for each TMDL's permits. Compile results in terms of TMDLs with permits
meeting all WLAs, TMDLs with permits partly meeting WLAs, and TMDLs with permits not meeting
WLAs.

             PS APPROACH 3: Permits/Listed  waters datasets. GIS. and ATTAINS query

Analysis Summary: Identify permits with known permit WLA status from the annual national analysis
done under the Priority Permits Initiative.  Use the Permits GIS Dataset to identify these permits
geospatially.  Overlay the Permits GIS Dataset and the 303(d)  Listed Impaired Waters GIS Dataset.  Use
the 303(d) Listed Impaired Waters GIS Dataset to obtain unique LIST IDs for the Reach Codes where
permit WLA status information is available. Repeat the overlaying with the 2002 Impaired Waters
Baseline GIS Dataset, and generate a second set of unique LIST IDs for the Reach Codes where permit
WLA status information is available. Combine the two sets and filter for unique  LIST IDs. Run an
ATTAINS query to identify the TMDLs associated with those LIST IDs. Re-link these TMDLs with the
known WLA status already analyzed for each TMDL's permits. Compile results in terms of TMDLs with
permits meeting all WLAs, TMDLs with permits partly meeting WLAs, and TMDLs with permits not
meeting WLAs.

                     NFS APPROACH 1: GRTS/TMDLs datasets and GIS analysis

Analysis Summary: Obtain an updated version of the NFS Projects GIS Dataset and use it to identify the
waters related to all GRTS projects (Section 319  projects) geospatially.  Include as attributes each GRTS

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
project ID and TMDL status from GRTS. Overlay the A/PS Projects GIS Dataset and the Waters with
TMDLs GIS Dataset.  Use the Waters with TMDLs GIS Dataset Reach Codes to obtain unique TMDL IDs
(i.e., the TMDL identifiers) for the Reach Codes where the 319 projects' TMDL status information
(whether developing or implementing a TMDL or developing an implementation plan) is available.
Identify the LIST IDs (i.e., the impaired waters segments) that relate to these TMDL IDs. Analyze LIST ID
AND POLLUTANT attribute information referenced to the Waters with TMDLs GIS Dataset to identify the
LIST ID/POLLUTANT combinations (i.e., TMDLs) associated with those waters. Re-link these TMDLs with
the known TMDL status already analyzed for each TMDL's 319 projects.  Compile results in terms of
TMDLs with a 319 project implementing a TMDL, TMDLs with a 319 project developing a TMDL, TMDLs
with a 319 project developing an implementation plan, and TMDLs with a 319 project of uncertain
relationship to the TMDL although concerning the same water.

                NFS APPROACH 2: GRTS/TMDLs datasets. GIS. and ATTAINS query

Analysis Summary: Obtain an updated version of the NFS Projects GIS Dataset and use it to identify the
waters related  to all GRTS  projects (Section 319 projects) geospatially. Note each GRTS project ID and
the Reach Codes for waters affected by the project. Overlay the A/PS Projects GIS Dataset and the
Waters with TMDLs GIS Dataset. The intersection of these two datasets represents the waters common
to both.  Use the Waters with TMDLs GIS Dataset to obtain unique TMDL IDs (i.e., the TMDL identifiers)
for the Reach Codes where the 319 projects' TMDL status information is available.  Identify the LIST IDs
(i.e., the impaired waters segments) that relate to these TMDL IDs and geographically coincide with the
waters identified in the intersection above. Run an ATTAINS query to identify the LIST ID/POLLUTANT
combinations (i.e., TMDLs) associated with those LIST IDs.  Re-link these TMDLs with the known TMDL
status entered  in GRTS for each TMDL's 319 projects. Compile results in terms of TMDLs with a 319
project implementing a TMDL, TMDLs with a 319 project developing a TMDL, TMDLs with a 319 project
developing an implementation plan, and TMDLs with a 319  project of uncertain relationship to the
TMDL although concerning the same water.

              NFS APPROACH 3: GRTS/Listed waters datasets. GIS. and ATTAINS query

Analysis Summary: Obtain an updated version of the A/PS Projects GIS Dataset and use it to identify the
waters related  to all GRTS  projects (Section 319 projects) geospatially. Note each GRTS project ID and
the Reach Codes for waters affected by the project. Overlay the A/PS Projects GIS Dataset and the 303(d)
Listed Impaired Waters GIS Dataset. The intersection of these two datasets represents the waters
common to both. Identify the unique LIST IDs (i.e., the impaired waters segments) for these waters.
Repeat the overlaying with the 2002 Impaired Waters Baseline GIS Dataset, and generate a second set
of unique LIST IDs. Combine the two sets and filter for a set of unique LIST IDs that represent impaired
waters with Section 319 projects. Run  an ATTAINS query to identify the LIST ID/POLLUTANT
combinations (i.e., TMDLs) associated with those LIST IDs.  Re-link these TMDLs with the known TMDL
status entered  in GRTS for each TMDL's 319 projects. Compile results in terms of TMDLs with a 319
project implementing a TMDL, TMDLs with a 319 project developing a TMDL, TMDLs with a 319 project
developing an implementation plan, and TMDLs with a 319  project of uncertain relationship to the
TMDL although concerning the same water.

       Approach 3 was selected for both the PS and NPS assessment components. The chosen
methodologies are described in detail below.

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
  Figure 2.  Flow diagram for the PS TMDL implementation assessment methodology.
       303(d) Listed (most recent)
      Impaired Waters GIS Dataset
         List ID
          NHD Reach Code
     2002 Impaired Waters Baseline
             GIS Dataset
List ID
                   NHD Reach Code
                                                        Permits With Known WLA
                                                            Status (from PPI)
                                                                 Permit ID
                                                                             Permit Status
                                                 NHD Reach Code

                                    Unique List ID Values for Listed
                                             Waters
                                      List ID
                                                   IMHD Reach Code
                                         ATTAINS
                                    List ID
                                       Pollutant    (= PS TMDLs)
                                                Pollutant     Permit Status
                                 PS TMDLs with known permit WLA status
PS TMDLs Assessment Approach

       The data to assess the WLA status of individual permits and relate the findings to specific TMDLs
were drawn from separate permit and TMDL data sources and integrated via this analysis project (Figure
2). Permit information was available from the Permit Compliance System (PCS) and the updated
Integrated Compliance Information System (ICIS). Geospatial (GIS) information on permits was recently
compiled in a Permits GIS Dataset that documented the Latitude/Longitude of permitted facilities and
outfalls and referenced these to the National Hydrography Dataset (NHD).  Key information was also
obtained through the Priority Permits Initiative, within which state and EPA permit programs annually
and nationally flag permits associated with WLAs in TMDLs and relate their update status to meeting the
TMDL WLAs.  TMDL information was extracted from the ATTAINS data system,  as well as from national
geospatial datasets of impaired waters with related attributes on TMDL existence accessible through the
Reach Address Database. The existence of geospatial data for both permits and TMDLs enabled the
linkage of greater numbers of TMDL and permit attributes than previously possible through the limited
linkages across the independent ATTAINS and  PCS/ICIS data systems.

       The approach for PS TMDLs began with identifying the WLA status through data gathered by the
EPA Permits program in the Priority Permits Initiative, which added 'permits associated with a TMDL' to
its list of criteria after the 2007 TMDL program review.  EPA's analytical process for priority permits
engages all the states annually and requires their participation in documenting the WLA status for their
permits.  At the beginning of each fiscal year,  states review a list of all permits that have a TMDL WLA

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
and separate those that already meet the WLA from those that do not.  Permits not meeting the WLA
(due to expiration or needing reissuance before the end of the year to meet the WLA) are monitored as
priority permits and their WLA status (i.e., whether or not the permits meet the WLA) is updated at
year's end.  Year-end national statistics available from this stage of the analysis included the counts and
IDs of permits that originally met the WLA or were updated to meet the WLA or terminated during the
year, as well as the  count and IDs of permits that still do not meet the WLA.

       With WLA status already determined on an individual permit  basis, these permits were related
spatially to specific  impaired waters. This involved two impaired waters datasets - the 2002 Impaired
Waters Baseline GIS Dataset, and the 303(d) Listed Impaired Waters GIS Dataset. Together, these two
datasets represented the most complete geospatial coverage of impaired waters that could be checked
for TMDLs by associating their LIST IDs with ATTAINS data tables on completed TMDLs. The Permits  GIS
Dataset was intersected with both impaired waters GIS datasets to identify all the impaired waters LIST
IDs that needed to be checked for TMDLs in an ATTAINS query. The product returned by this query was
a list of TMDLs (i.e., unique waterbody segment/pollutant combinations) that exist on waterbodies for
which the permit IDs are also known. Because of the common referencing to NHD waters among all
these GIS datasets,  permit ID (and thus its WLA status) was  able to be linked to the TMDLs as an
attribute.

       In the final step, the permit-based WLA status determined earlier was transformed into the
TMDL's WLA status, again due to the links established among permit IDs, LIST IDs, TMDLs, and WLA
status. Results were summarized nationally in a data table as number of TMDLs with permits all
implementing their WLAs, partially implementing their WLAs, or not implementing their WLAs.
Additional implementation-relevant statistics concerning permits and PS TMDLs were also compiled  and
provided in this report.


NFS TMDLs Assessment Approach

       As with PS TMDLs, the data to assess the LA status of individual Section 319 projects and relate
the findings to specific TMDLs were drawn from multiple NPS and TMDL data sources (Figure 3).  The
Section 319 project information  is housed in EPA's Grants Reporting and Tracking System (GRTS), which
is populated by 319 grant recipients and managed by EPA. Since 2002, recipients of projects with a
TMDL connection have been populating TMDL fields in GRTS.  Recently, geospatial information on
Section 319 projects has been developed and, as in the Permits GIS Dataset, referenced to the  NHD to
produce the NPS Projects GIS Dataset. TMDL information was extracted from the ATTAINS data system,
as well as from national geospatial datasets of impaired waters with related TMDL attributes accessible
through ATTAINS. The existence of geospatial data for both Section 319 projects and TMDLs enabled the
linkage of greater numbers of TMDL and  Section 319 project attributes than previously possible through
the limited linkages across the independent ATTAINS and GRTS data systems.

       The approach for NPS TMDLs began with obtaining the NPS Projects GIS Dataset and using it to
identify the waters from the NHD that are related to all GRTS projects geospatially. Attribute
information extracted for each mapped Section 319 project feature included its GRTS project ID and  the
Reach Codes of the NHD waters  affected by the project. The NPS Projects GIS Dataset was then
intersected with the 303(d) Listed Impaired Waters GIS Dataset and again with the 2002 Impaired
Waters Baseline GIS Dataset, to  obtain unique LIST IDs (i.e., the impaired waters segments) for the
                                                                                           8

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
waters that were related to the Section 319 projects as well as being mapped impaired waters (from
either of the two impaired waters GIS datasets).
  Figure 3. Flow diagram for the NPS TMDL implementation assessment methodology.
       303{d) Listed (most recent)
      Impaired Waters GIS Dataset
         List ID      NHD Reach Code
     2002 Impaired Waters Baseline
             GIS Dataset
         List ID      NHD Reach Code
CRTS and the NPS Projects GIS Dataset
                                                NHD Reach Code     Project ID      TMDLStatus
                                     Unique List ID Values for Listed
                                              Waters
                                       ListID         NHDReachCode
                                     1
                                          ATTAINS
                                     List ID        Pollutant    (= NPS TMDLs)
                                 NPS TMDLs with known 319 TMDL status
       At this stage, it was necessary to further analyze this set of waters to determine which waters
are not only impaired and related to Section 319 projects but also have one or more completed TMDL.
This step was accomplished by ATTAINS database query to determine the TMDLs from the LIST IDs
mentioned above. Because of the common referencing to NHD waters among all the  GIS datasets, GRTS
project ID was able to be linked to all of these TMDLs as an attribute.

       The final stage of the analysis required linking these TMDLs back to GRTS data system fields that
show the relationship of Section 319  projects since 2002 to TMDL implementation (i.e., TMDL status).
Specific GRTS TMDL field entry options include "implementing a  TMDL", "developing a TMDL", and
"developing an implementation plan." A fourth entry option, "not applicable" indicates that the primary
purpose of the project was not directly related to a TMDL; however, these projects may have indirect
relationships to TMDL implementation that were not specifically defined. Because the GRTS project IDs
were retained throughout the analysis by their spatial relationship to LIST IDs, the GRTS data on TMDL
status of each Section 319 project were able to be made attributes of the individual TMDLs. In doing so,
the analysis revealed that some Section 319 projects co-occurred with waters that do  have TMDLs but
none of the GRTS options above were reported. A fourth TMDL  status option was thus created to
combine the "not applicable" GRTS entries with these co-occurring projects, and represent them as
"TMDLs with a 319 project of uncertain relationship to the TMDL although concerning the same water."
The analysis concluded in the development of a data table that summarized the national numbers of
TMDLs with Section 319 projects in each of the four TMDL status categories. Additional

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011


implementation-relevant statistics concerning Section 319 projects and NPS TMDLs were also provided
in this report.
Assessment Results

       The analysis procedures described above were able to produce national-scale summary statistics
on PS and NPS TMDL implementation as well as the data gaps and causes associated with each. Further,
these analyses generated information on permits and Section 319 projects that is directly relevant to
implementation but not able to be expressed in TMDL terms. Table 1 provides a summary of these
results followed by text sections on PS TMDL findings, NPS TMDL findings, and data gaps.
Table la. PS TMDL IMPLEMENTATION: SUMMARY RESULTS
How many TMDLs are PS-related TMDLs
(PS-only and Mixed)?
How many/what % of PS TMDLs are on
mapped waters?
How many/what % of mapped PS
TMDLs have permit WLA status known?
How many/what % of PS TMDLs with
known permit WLA status are in each
WLA status category?
How many/what % of these permits are
in each WLA status category?
20,336
15,934
2,671
All Meeting WLAs 2,052
Part Meeting WLAs 133
Not Meeting WLAs 486
Permits Meeting WLAs 9,225
Permits Not Meeting WLAs 478

78%
17%
All Meeting WLAs
Part Meeting WLAs
Not Meeting WLAs
Permits Meeting WLAs
Permits Not Meeting WLAs
77%
5%
18%
95%
5%
Table Ib. NPS TMDL IMPLEMENTATION: SUMMARY RESULTS
How many TMDLs are NPS-related
TMDLs (NPS-only and mixed)?
How many/what % of NPS TMDLs are on
mapped waters?
How many/what % of mapped NPS
TMDLs have CWA Section 319 projects?
How many/what % of mapped NPS
TMDLs with CWA Section 319 projects
have reported direct relationships or
spatial co-occurrence with TMDLs?
How many/what % of mapped NPS
TMDLs with Section 319 projects of
known TMDL status are in each status
category?
How many Section 319 projects are in
CRTS?
How many Section 319 projects have
data available to query TMDL status?*
How many/what % of these Section 319
projects have a reported direct
relationship to a TMDL?**
How many/what % of these Section 319
projects are in each TMDL status
category?
39,478
30,702
2,438
Direct relationship 1,402
Spatial association 1,036
Implementing a TMDL 1,287
Developing a TMDL 82
Developing a TMDL
Implementation Plan 33
Uncertain Relationship
to Co-Occurring TMDL 1,036
19,251
8,210
2,729
Implementing a TMDL 1,953
Developing a TMDL 522
Developing a TMDL
Implementation Plan 254

78%
8%
Direct relationship
Spatial association
Implementing a TMDL
Developing a TMDL
Developing a TMDL
Implementation Plan
Uncertain Relationship
to Co-Occurring TMDL
57%
43%
53%
3%
1%
43%

43%
33%
Implementing a TMDL
Developing a TMDL
Developing a TMDL
Implementation Plan
72%
19%
9%
                                                                                        10

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011


*Mapping was not available or required for Section 319 projects prior to 2002
**TMDL status was not available or required for Section 319 projects prior to 2002

Results Part 1: Implementation of PS-related TMDLs
Metric 1: TMDLs with NPDES permits implementing TMDL waste/odd allocations (WLAs)

PS TMDL implementation Highlights
  Number of PS TMDLs for which sufficient data were available to assess WLA status:        2,671
  Number of PS TMDLs with all NPDES permits implementing WLAs:*                      2,052
  Percent of assessed PS TMDLs with NPDES permits implementing WLAs:                   77%
  Number of NPDES permits for which sufficient data were available on WLA status:         9,703
  Number of NPDES permits meeting WLAs:                                            9,225
  Percent of assessed NPDES permits meeting WLAs:                                     95%

* the actual Metric 1 reporting statistic required under OIG Recommendation 2

       As of FY2010 end of year, a total of 20,336 PS TMDLs (including point-source-only and mixed
TMDLs) had been documented in ATTAINS. The PS TMDLs for which mapped impaired waters
information was available constituted 15,934 (78%) of all PS TMDLs. Availability in mapped form was
essential to  linking permits and TMDLs in this assessment. Although similar figures relating total permits
to mapped permits were not available, the permits GIS dataset contained over 160,000 permit related
features (mostly not related to impaired waters or TMDLs) at the time of this analysis. The third
essential data component was permit WLA status determined via the  priority permits initiative. This
component related to the subset of permits that involve an impaired water, are related to a TMDL, and
have an  individual WLA.

       The nexus of these three main inputs was a total of 2,671 PS TMDLs for which NPDES permit
WLA status was known and therefore assessable (Figure 4a). Some of these TMDLs involved multiple
permits of known WLA status, thus it was  possible to identify TMDLs that were partly meeting and partly
not meeting WLAs as well as the "meeting" and "not meeting" categories. Some permits also related to
more than one TMDL, due to multiple TMDLs on the same waterbody and/or multiple water body
 Figure 4. Number and proportions of assessed PS TMDLs (a, left) and NPDES permits (b, right)
 categorized by meeting or not meeting TMDL wasteload allocations (WLAs) in the permit terms.


          PS TMDLs of known WLA status             NPDES Permits WLA status
                                                           • Permits Meeting WLAs
          • All Meeting WLAs    • Part Meeting WLAs
          • Not Meeting WLAs                                  • Permit Not Meeting WLAs
                                                            478
                  486(18%,
           133(5%)
                                                                                        11

-------
     FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
segments under the same permit. There were 2,052 PS TMDLs (77%) for which all permits were meeting
their WLAs. An additional 133 PS TMDLs (5%) had some but not all permits meeting their WLAs. A total
of 486 PS TMDLs (17%) had not met their WLAs.

       The data on NPDES permits meeting their WLAs was also summarized nationally because it
represented a more direct way of observing the primary element of PS TMDL implementation without
losing data quantity due to data gaps in the translation to reporting WLA status on a TMDL basis. The
necessary information on permits meeting or not meeting their TMDL WLAs was available for 9,703
permits. This quantity represented the national total of all NPDES permits that have an individual WLA
as reported in ATTAINS. Of these permits, 8,849 were verified by EPA and states as already meeting
their WLAs, and 854 that needed changes to meet the WLA were tracked throughout 2010.  Among the
tracked permits, 376 were meeting the WLAs or were terminated by the end of FY2010 and 478 did not
yet meet the WLAs. In total, the permits meeting WLAs constituted 95% of the total permits with WLAs
(Figure 4b).
Results Part 2: Implementation of NFS-related TMDLs
Metric 2: TMDLs with one or more 319 projects implementing TMDL load allocations (LAs)

NFS TMDL implementation Highlights
  Number of NPS TMDLs for which sufficient data were available to assess LA status:          2,438
  Number of NPS TMDLs with Section 319 projects implementing LAs: *                      1,287
  Percent of assessed NPS TMDLs with Section 319 projects implementing LAs:                53%
  Number of Section 319 projects implementing LAs:                                     1,953

* the actual Metric 2 reporting statistic required under OIG Recommendation 2

       As of FY2010 a total of 39,478 NPS TMDLs (including nonpoint-source-only and mixed TMDLs)
had been documented in ATTAINS.  The NPS TMDLs for which mapped impaired waters information was
available constituted 30,702 (78%) of all NPS TMDLs. Availability of impaired waters and TMDL
information and Section 319 project information in  mapped form was essential to linking TMDLs and
Section 319 projects in this assessment.  The third essential ingredient for this analysis was Section 319
project-specific information from the GRTS data system identifying the project's relationship to
implementing a TMDL, developing a TMDL, developing an implementation plan, or its uncertain
relationship to a TMDL although concerning the same water. A total of 19,251 Section 319 projects are
documented in GRTS, and 8,210 of these projects have appeared since the GRTS TMDL field for data
entry has existed (2002).

       It should be noted that several of the Section 319 NPS management program's many purposes
and applications are unrelated to implementing TMDLs. For example, Section 319 grants can be used to
protect or restore threatened waters that are as-yet unimpaired. Implementing practices relative to a
TMDL is one of the major  purposes,  but not the sole purpose, of Section 319 program resources. Thus, a
specific target number or  percent of Section 319 projects implementing TMDLs does not exist.
                                                                                        12

-------
     FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
       A total of 2,438 NPS TMDLs had the three data elements essential for determining the
relationship between the TMDL and one or more Section 319 projects (Figure 5). Among these, 1,402
(57%) had data identifying the Section 319 project's relationship to a implementing a TMDL, developing
a TMDL, or developing an implementation plan. A total of 1,287 (53%) were reportedly implementing a
TMDL, 82 (3%) were developing a TMDL, and 33 (1%) were developing a TMDL implementation plan.
Figure 5. Number and proportions of assessed NPS TMDLs (a, left) and Section 319 projects (b, right)
categorized by relationship
a.

tA
\-t
S^ 	
Assessed NPS
TMDLs

^6, J 1,287
''*' (53%)J
33(i%r^^^^*"
82(3%)
of the projects to TMDLs.
b. NPS Section
• Implementing a TMDL
319 projects
• Developing a TMDL 254(9%)
^^^••^^^^^
Developing a TMDL 522(19%) 1953
Implementation Plan (770/1 J
Uncertain Relationship ^^^r
to Co-occiiringTMDL

• Implementing a TMDL

• DevelopingTMDL

• Developing a TMDL
Implementation Plan
The remaining 1,036 (43%) NPS TMDLs had Section 319 projects co-occurring on the same water but
with an uncertain relationship to the TMDL, potentially because they pre-dated the TMDL field's
availability in GRTS, or were subject to limited reporting, or were unrelated to the TMDL.

       The data specifically on Section 319 projects was also summarized nationally (Figure 5b) because
it offered a more direct way of observing one of the primary elements of NPS TMDL implementation
without losing data quantity in the translation to reporting NPS implementation status on a TMDL basis.
GRTS information indicated that 2,729 Section 319 projects (33% of the GRTS projects since 2002)
reported a direct involvement in one of three TMDL phases. Most of these Section 319 projects- 1,953
(72%) - were implementing a TMDL. An additional 522 (19%) were part of developing a TMDL, and 254
(9%) were developing a TMDL Implementation Plan.

Results Part 3: PS-related and NFS-related TMDL Implementation Data Gaps
Metric 3:  TMDLs for which TMDL implementation data are unavailable to EPA

PS TMDL and NPS TMDL Implementation Data Gaps Summary
  Number of all PS TMDLs for which insufficient data were available to assess WLA status:*       17,665
  Number of mapped PS TMDLs for which insufficient data were available to assess WLA status:   13,263

  Number of NPS TMDLs for which insufficient data were available to assess LA status:*          37,040
  Number of mapped NPS TMDLs for which insufficient data were available to assess LA status:   28,264

* the actual Metric 3 reporting statistics required under OIG Recommendation 2; because total PS
TMDLs and total NPS TMDLs both include mixed TMDLs, their total TMDLs with data gaps also overlap.
                                                                                       13

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
       Data limitations are an inevitable component of any data system that involves continual change
and lag times in data reporting or processing. Data gaps do affect TMDL, permits, and NPS data systems
and thus the completeness of information targeted for this assessment. This report section addresses
what is known about existing TMDL implementation  data gaps and discusses how these gaps probably
affect the assessment results by reducing the proportion of the TMDL universe that could be assessed in
this project.  PS and NPS gaps are discussed separately in order to relate the gaps to the independent PS
and NPS analysis methods. This discussion generally follows the same information sequence seen in
Table 1.

       ATTAINS data tables provide the most comprehensive information available on TMDLs reported
regularly by states and uploaded to ATTAINS by EPA  Regional staff.  Because of the long-standing
emphasis on reporting TMDL numbers each fiscal year, gaps in the total of 20,336 PS TMDLs indicated in
ATTAINS are likely insignificant. This analysis found that 15,934 (78%) of those PS TMDLs were on
mapped waters present in EPA's national GIS datasets; this well-known data gap is primarily due to the
significant lag time between state development of tabular list information and reformatting of the
information as  impaired waters GIS data. The unmapped waters  with TMDLs are thus likely to be among
the most recent (last year or two) TMDLs, which also constitute TMDLs that have not had time to begin
significant implementation. Nevertheless, 78% of PS TMDLs were able to be included in the first stage of
this analysis. The mapping data gap did not represent any significant coverage bias (e.g., no data at all
for whole states) that would affect the national coverage of the assessment. All states have impaired
waters mapping that covers the majority of their waters, but they may vary in their recent mapping
updates. Whereas the data gaps related to mapping may seem substantial, they must be seen in the
context that a mapping approach is currently the only feasible method for nationally relating thousands
of TMDLs,  permits, and Section 319 projects implementation to one another without extraordinary
expense.

       Permits data are also likely to have data gaps related to mapping, although these could not be
quantified like the TMDL mapped data gap.  The Permits GIS date/set was very recently constructed and
still undergoing improvement, yet contains over 160,000 permit features.  The proportion of total
individual (major and minor) permits included is believed to be very high, while coverage may be more
uneven for general permits.  More comprehensive information was present in the priority permits
tabular data, which were derived through data systems queries.

       There were 9,703  candidate priority permits of known WLA status used in this analysis. The
mapped coverage contained 6,535 (67%) of these permits.  Among the mapped permits 6,071 (93%)
were meeting their WLAs and 464 (7%) were not  meeting their WLAs. The mapped data gap may be  due
to the time lag associated  with continually georeferencing the newest permits as well as potentially
incomplete mapping, as the Permits GIS date/set is relatively new  and continues to evolve. The
expectation is that the quality of the dataset will continue to improve resulting in better permit
coverage.  For the purpose of this analysis, the mapped portion of the permits provided the best
available representation of the permits subpopulation  of known WLA status. The proportion of the
mapped permits meeting their WLAs (93%) and not meeting their WLAs (7%) was similar to that of the
9,703 candidate priority permits meeting their WLAs (95%) and not meeting their WLAs (5%). Similarity
in the proportions meeting WLAs suggests that, were mapping available for the additional one-third  of
permits that were not mapped, this may have increased the evidence of total numbers of TMDLs with
permits meeting WLAs by one-third.
                                                                                          14

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011


       The number of mapped PS TMDLs (2,671 or 17%) containing all three necessary elements
required for this analysis significantly reduced the number of fully assessable PS TMDLs. This proportion
still represents a robust subset of TMDLs approximately 20 times the size of a TMDL sample design
capable of providing statistically significant results on a national level. The subset of TMDLs that could
not be assessed appears to be the result of a cumulative effect of the three data sources' individual
gaps.  As noted above, despite the significant size of the gap, there was no evidence that it represented
any significant coverage bias.

       Generally minor mapping errors also contributed to  reducing the total number of PS TMDLs for
which all the necessary data  were available to assess WLA status. The 2002 Impaired Waters Baseline
GIS Dataset and the 303(d) Listed Impaired Waters GIS Dataset have data gaps mainly due to the time
lag continually associated with mapping the newest impaired waters and TMDLs and secondarily due a
variety of minor state-level mapping issues.  NHD mapping inconsistencies also may have contributed to
the data gaps.  For example,  NHD contains polygons for which no artificial flow line has been generated,
and it is possible that  a number of polygonal features in the  impaired and listed waters datasets were
not included in this analysis due to the lack of flow lines. Another data gap is associated with permits
that might be associated with a PS TMDL but are located on  a different Reach Code than the PS TMDL
itself. This situation might arise from permits issued to dischargers that are located upstream from an
impaired waterbody, yet included in a watershed TMDL. This study did not estimate how many PS
TMDLs might fall under such a scenario, but it is likely that not accounting for upstream permit locations
further contributes to underestimating the total number of PS TMDLs with  known permit WLA status.

       Like the PS TMDLs described above, the 39,478 NPS  TMDLs are comprehensively documented in
ATTAINS and data gaps are likely minor, but the same lag time in GIS data development reduced the
mapped NPS TMDLs to 30,702 (78%) of the total. The NPS projects GIS dataset also represents less than
100% of the projects tracked in the GRTS data system.  Of the 8,931  projects in GRTS since 2002, 3,170
(35%) have been mapped, and mapping of GRTS Section 319 projects was not conducted before 2002.
As the third primary element for NPS analysis, GRTS has comprehensive coverage of Section 319
projects throughout the history of the program but its field that directly addresses TMDLs has been in
use only since 2002. Further, mapping has not been required for Section 319 statewide program
implementation efforts or education/outreach efforts,  both  of which may be related to TMDLs. Thus, a
potentially significant number of TMDL and Section 319 relationships could be undocumented in GRTS
pre-2002, or in the unmapped proportion  of TMDLs and Section 319 relationships.

       The 2,438 mapped NPS TMDLs with all three necessary data  sources equals just 8% of all
mapped NPS TMDLs, but it should be noted that Section 319 projects are not the exclusive or the largest
source of NPS implementation activities. Thus the data gap's unassessed NPS TMDLs may include
TMDLs that are being implemented by other NPS-related activities, implemented by unmapped or
unreported Section 319 projects, or not implemented.  Similar to the analysis for the PS TMDLs, the
geospatial analysis for the NPS TMDLs also was limited by data gaps  associated with mapping and the
inability to track the relationship between TMDLs and upstream locations of associated Section 319
projects.  These data gaps contributed to undercounting the number of NPS TMDLs with Section 319
projects contributing to implementation in this analysis.

       It is important to note that the group called "uncertain relationship to co-occurring TMDL" was
based on two sources. In the geospatial data, some Section  319 projects were shown to co-occur on the
same water as a TMDL but had not reported a direct relationship to the TMDL, sometimes due to the
project preceding the GRTS TMDL field's availability. Other Section 319 projects had left the field blank

                                                                                          15

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011


or checked "N/A," both of which imply that although the project's primary purpose is likely not TMDL-
related, indirect relationships to TMDL implementation may exist. Thus, additional NPS TMDLs actually
might have a Section 319 project on the same waterbody segment associated with their
implementation. As data entry for the TMDL field in the GRTS dataset continues to increase and work
continues on the GIS dataset, a more comprehensive list of NPS TMDLs is expected.

       In summary, the high costs  and logistical infeasibility of maintaining total coverage state and
EPA data systems concerning all TMDLs, Section 319 projects, and permits cause significant data gaps,
but high numbers of TMDLs can still be assessed. The gaps limit the ability of this  study to report on
percentages of all TMDLs being implemented with statistical confidence, but they do not prevent the
ability to report on a subset of sufficiently documented TMDLs in terms of the numbers of PS TMDLs and
NPS TMDLs with implementation occurring.  The thousands of TMDLs that did have sufficient data to
assess their implementation were not a probabilistic statistical sample.  Thus, the  figures presented as
percents refer to the proportion of  TMDLs with sufficient data and are not meant  to represent
percentages of all TMDLs implementing permits or Section 319 projects. Yet, no biases were identified
in this subset  of TMDLs that would  suggest the TMDLs  with sufficient data have a  higher, or lower,
implementation rate than TMDLs in general. The available data, the size of the data gaps, and what is
known about  the data gaps, do suggest that the actual national totals of PS and NPS TMDLs being
implemented  far exceed the numbers counted in this assessment.

Discussion  and Conclusions

       EPA, states and others have long maintained a keen interest in knowing more about TMDL
implementation, but aside from case studies implementation results have remained elusive.  In early
2008, there were virtually no methods available to use EPA data systems to count or estimate
implementation of PS TMDLs or NPS TMDLs on a national basis. A very limited TMDL implementation
tracking concept was costed out as  requiring a data systems budget of over $10 million per year, even
with  caveats that said decentralized implementation, lack of reporting authority, non-response, and
other factors would cause significant data gaps in such a system. A probabilistic survey approach could
obtain statistically valid implementation estimates of a few primary implementation rates but would
also require several hundred thousand dollars and well over a year to complete. One six-state,
probabilistic statistical sampling study found an implementation rate exceeding 80% (Tetra Tech, Inc.,
2009; EPA, 2009), but the  sampling  experience indicated that higher logistical difficulties and expense
would challenge such a survey at national level.

       The geospatial data representing TMDLs, impaired waters, Section 319  projects, and permits
changed significantly between 2008 and the present.  The ATTAINS data system reporting of WLAs, and
GRTS data system reporting of projects implementing TMDLs, both continued to improve. In addition,
the priority permits initiative added a procedure for nationally evaluating permits with WLAs from
TMDLs.  Together, these factors opened an opportunity to assess implementation for a significant
number of PS  and NPS TMDLs.

       The TMDLs that could be assessed in this study represent a minority of all TMDLs, yet the TMDLs
that had evidence of implementation occurring numbered in the thousands. Of those TMDLs that could
be assessed, the proportions that are implementing are substantial. This finding is consistent with other
statistical studies of TMDLs that show a majority undergoing implementation.  Analysis of the data gaps
appears to indicate that, were it possible to analyze many more TMDLs similarly, much more


                                                                                          16

-------
      FY2010 National Report on Implementing TMDLs - Doc. No. EPA841-R-11-002, March 2011
implementation would be found.  This assessment approach can be repeated periodically, provided that
the key data sources and data systems are able to keep pace with TMDLs, permits, and Section 319
projects.  Improvements in these data systems are likely to show much better numbers in TMDL
implementation if they can reduce the data gaps that limited this study's findings.

Notice

       This study was performed by the US Environmental Protection Agency Office of Water in
Washington, DC.  The document has undergone program review and approval for online publication.
Publication does not signify that the contents necessarily reflect the views and policies of the USEPA.
Mention of commercial or trade names does not constitute endorsement for use.

This document should be cited as:

EPA. 2011. FY2010 National Report on Implementing Total Maximum Daily Loads (TMDLs). Document
#EPA841-R-11-002.  Office of Water, US Environmental Protection Agency, Washington DC.  Available
online at  http://water.epa.gov/lawsregs/lawsguidance/cwa/tmdl/results index.cfm 17pp.
References

EPA. 2009. Analysis of TMDL Implementation Rates in EPA Region 5: Final Report. Document #EPA841-
R-005.  Office of Water, US Environmental Protection Agency, Washington DC.  44 pp.

EPA. 2011. National Summary of Impaired Waters and TMDL Information.  Accessed 3/3/11, last
updated 3/3/11. URL: http://iaspub.epa.gov/waterslO/attains nation  cv.control?p report type=T.

Federal Water Pollution Control Act of 1972 (FWPCA). 1972. Public Law 92-500, 86 Stat. 816.  Amended
in 1977 and 1987, referred to as the Clean Water Act, codified at 33 U.S.C. 1251-1387 (1988)

DIG. 2007. Total Maximum Daily Load Program Needs Better Data and Measures to Demonstrate
Environmental Results, DIG Report  No. 2007-P-00036 Office of the Inspector General, US Environmental
Protection Agency, Washington DC. 30 pp.

Tetra Tech, Inc. 2009. Analysis of TMDL Implementation Rates in EPA Region 5.  Project Report, USEPA
Office of Water Contract # EP-C-08-004.  Cleveland, Ohio.  33  pp.
                                                                                        17

-------