OSWER# 9200.2-120 FY 2012 REPORT TO CONGRESS SUPERFUND FIVE-YEAR REVIEWS PURPOSE: The U.S. Environmental Protection Agency (EPA) is responsible for reviewing Superfund remedial actions at least every five years where hazardous substances, pollutants, or contaminants will remain on site above levels that allow for unlimited use and unrestricted exposure, EPA is also responsible for preparing a report to Congress on these reviews. BACKGROUND: Section 121(c) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, states; "If the President selects a remedial action that results in any hazardous substances, pollutants, or contaminants remaining at the site, the President shall review such remedial action no less often than each 5 years after the initiation of such remedial action to assure that human health and the environment are being protected by the remedial action being implemented. In addition, if upon such review it is the judgment of the President that action is appropriate at such site in accordance with section 9604 or 9606 of the Title, the President shall take or require such action, " CERCLA also requires that EPA report to Congress information regarding these sites for which the reviews are required. This report provides a list of sites, information about sites where additional work is required, and contacts for additional information. FINDINGS: The attached table presents a list of statutory, policy and discretionary1 five-year reviews that were conducted for non-federal sites and federal National Priorities List (NPL) sites, including the following: 1 Statutory reviews are carried out if both of the following conditions are true: 1) Upon completion of the remedial action, hazardous substances, pollutants, or contaminants will remain on site; and 2) The Record of Decision (ROD) for the site was signed on or after October 17, 1986 (effective date of the Superfund Amendments and Reauthorization Act- SARA) and the remedial action was selected under CERCLA §121. Policy reviews are carried out for the following types of actions: 1) a pre- or post-SARA remedial action that, upon completion, will not leave hazardous substances, pollutants, or contaminants on site above levels that allow for unlimited use and unrestricted exposure, but requires five years or more to complete; 2) a pre-SARA remedial action that leaves hazardous substances, pollutants, or contaminants on site above levels that allow for unlimited use and unrestricted exposures; or 3) a removal-only site on the NPL where a removal action leaves hazardous substances, pollutants, or contaminants on site above levels that allow for unlimited use and unrestricted exposure and where no remedial action has or will take place. Regions may also carry out a discretionary review which is not required by the statute but may be completed at the Region's discretion to help ensure the protectiveness of the remedy. ------- " Reviews due and completed in FY 2012; " Reviews due in FY 2012, completed in a prior or later fiscal year " Reviews due in a prior or later fiscal year, completed in FY 2012; and " Reviews due in current or prior fiscal years, still pending completion of the report, For non-federal sites, a total of 188 sites required five-year reviews in FY 2012. All of the reviews due in FY 2012 are complete. Three of the 188 reviews were completed in a previous fiscal year but were due in FY 2012. These reviews are being counted as completed in FY 2012. Another 5 reviews due in prior or later fiscal years were also completed in FY 2012, bringing the total number of non-federal site five-year reviews completed to 193. For federal NPL sites, a total of 36 sites required five-year reviews in FY 2012. Three of the 36 reviews were completed in previous fiscal years but were due in FY 2012. Those reviews are being counted as completed in FY 2012. An additional 5 reviews due in prior or later fiscal years also were completed in FY 2012, bringing the total number of federal NPL site five-year reviews completed to 41. In all, the total number of five-year reviews completed for both non-federal and federal NPL sites was 234. Based on the reviews, EPA has determined that 10 sites (or portions of the sites) were "not protective" and deferred the "protectiveness" determination at 25 sites.2 Recommendations to do additional work or study for each of these sites are tracked in the CERCLIS database and, semi-annually, headquarters monitors the progress in implementing these recommendations to resolve protectiveness-related issues at all sites. For non-federal sites, 2 reviews due in prior fiscal years remain pending and EPA is working to complete them. For federal NPL sites, no reviews due in prior fiscal years are pending. EPA expects that all reviews will be completed in the near future. Summary copies of all five-year reviews, including those contained in this report, can be accessed publicly via the national Superfund web page (http://cfpub.epa.gov/fiveyear/). These reports contain detailed information regarding the effectiveness of the site remedy and assess whether human and/or ecological exposures are occurring. The information in these reports includes the protectiveness determinations that are ultimately selected and are reported in the following table for each site. For additional information on any of the five-year reviews identified in this report, please contact the Office of Superfund Remediation and Technology Innovation at (703) 603-8960, or the Superfund Call Center at (703) 412-9810 or (800) 424- 9346. 2 A subsequent five-year review addendum for the Tobyhanna Army Depot site, completed on 07/23/2013, found the remedy to be "protective." ------- FY 2012 Super-fund Five-Year Review Report to Congress Non-Federal Facility Reviews Due and Completed in FY 2012 Region 01 01 01 01 01 01 01 01 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 03 04 04 04 04 Site Name AUBURN ROAD LANDFILL GALLUP'S QUARRY KELLOGG-DEERING WELL FIELD O'CONNOR CO. PETERSON/PURITAN, INC. PINE STREET CANAL UNION CHEMICAL CO., INC. WINTHROP LANDFILL BOG CREEK FARM BREWSTER WELL FIELD BYRON BARREL & DRUM CALDWELL TRUCKING CO. CORNELL DUBILIER ELECTRONICS INC. COSDEN CHEMICAL COATINGS CORP. CURCIO SCRAP METAL, INC. DEREWAL CHEMICAL CO. FACET ENTERPRISES, INC. FEDERAL CREOSOTE FOREST GLEN MOBILE HOME SUBDIVISION HAVILAND COMPLEX HUDSON RIVER PCBS JACKSON STEEL KATONAH MUNICIPAL WELL LIBERTY INDUSTRIAL FINISHING LIPARI LANDFILL LITTLE VALLEY MACKENZIE CHEMICAL WORKS OLDBETHPAGE LANDFILL ONONDAGALAKE PREFERRED PLATING CORP. RICHARDSON HILL ROAD LANDFILL/POND SAYREVILLE LANDFILL SINCLAIR REFINERY SOUTH BRUNSWICK LANDFILL SWOPE OIL & CHEMICAL CO. SYOSSET LANDFILL WHITE CHEMICAL CORP. ABEXCORP. AMBLER ASBESTOS PILES AVCO LYCOMING (WILLIAMSPORT DIVISION) BENDIX FLIGHT SYSTEMS DIVISION BOARHEAD FARMS BROWN'S BATTERY BREAKING CHISMAN CREEK CROYDON TCE DIXIE CAVERNS COUNTY LANDFILL EAST MOUNT ZION ENTERPRISE AVENUE FIKE CHEMICAL, INC. HALBY CHEMICAL CO. HELEVA LANDFILL HRANICA LANDFILL MIDDLETOWN AIR FIELD MOYERS LANDFILL PALMERTON ZINC PILE SAEGERTOWN INDUSTRIAL AREA SALTVILLE WASTE DISPOSAL PONDS TYLER REFRIGERATION PIT WILDCAT LANDFILL YORK COUNTY SOLID WASTE AND REFUSE AUTHORITY LANDFILL ARLINGTON BLENDING & PACKAGING B&B CHEMICAL CO., INC. BATTERY TECH (DURACELL-LEXINGTON) BLUE RIDGE PLATING COMPANY State NH CT CT ME Rl VT ME ME NJ NY NY NJ NJ NJ NJ NJ NY NJ NY NY NY NY NY NY NJ NY NY NY NY NY NY NJ NY NJ NJ NY NJ VA PA PA PA PA PA VA PA VA PA PA WV DE PA PA PA PA PA PA VA DE DE PA TN FL NC NC FYR Type Statutory Statutory Statutory Statutory Statutory Statutory Statutory Policy Policy Policy Policy Statutory Statutory Policy Policy Statutory Statutory Statutory Statutory Policy Statutory Policy Statutory Statutory Discretionary Policy Policy Statutory Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Policy Statutory Statutory Statutory Policy Statutory Statutory Policy Statutory Statutory Statutory Statutory Statutory Policy Statutory Policy Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory Fiscal Year Due 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 Date Completed 09/27/2012 09/2S/2012 09/28/2012 09/26/2012 09/24/2012 12/22/2011 09/27/2012 09/19/2012 07/02/2012 04/18/2012 09/11/2012 08/22/2012 11/28/2011 08/15/2012 03/01/2012 07/OS/2012 09/28/2012 05/03/2012 09/26/2012 07/30/2012 06/01/2012 08/15/2012 09/25/2012 06/04/2012 08/07/2012 05/14/2012 10/03/2011 09/20/2012 01/17/2012 09/25/2012 07/19/2012 02/28/2012 09/05/2012 09/05/2012 05/24/2012 01/18/2012 03/22/2012 05/10/2012 09/19/2012 09/26/2012 08/21/2012 09/27/2012 09/24/2012 12/07/2011 12/07/2011 09/21/2012 06/21/2012 03/26/2012 07/25/2012 09/27/2012 09/17/2012 04/16/2012 07/24/2012 08/10/2012 09/27/2012 09/12/2012 09/27/2012 09/04/2012 06/27/2012 09/11/2012 09/28/2012 08/09/2012 09/11/2012 09/26/2012 Protectiveness Determination1 Short-Term Protective Short-Term Protective Protective Protective Protectiveness Deferred Protectiveness Deferred Protective Short-Term Protective Protective Short-Term Protective Protectiveness Deferred Will be Protective Protective Protective Protective Protective Protectiveness Deferred Protective Short-Term Protective Protective Will be Protective Protective Short-Term Protective Protective Will be Protective Protective Will be Protective Protective Protective Protective Short-Term Protective Protective Short-Term Protective Short-Term Protective Will be Protective Protective Short-Term Protective Protective Protective Will be Protective Short-Term Protective Not Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Protective Protective Short-Term Protective Short-Term Protective Protective Protective Protective Protectiveness Deferred Protective Protective Protective Short-Term Protective Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective ------- Region 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 04 05 05 OS 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 05 OS 05 05 05 OS 05 05 05 06 06 06 06 06 06 06 Site Name BRUNSWICK WOOD PRESERVING BYPASS 601 GROUND WATER CONTAMINATION CHEMTRONICS, INC. ESCAMBIA WOOD - PENSACOLA FORT HARTFORD COAL CO, STONE QUARRY TOPPERS CO., INC. (MORRISVILLE PLANT) LEWISBURS DUMP LEXINGTON COUNTY LANDFILL AREA MARTIN-MARIETTA, 5ODYECO, INC. MARZONE INC./CHEVRON CHEMICAL CO. MATHIS BROTHERS LANDFILL (SOUTH MARBLE TOP ROAD) MAXEY FLATS NUCLEAR DISPOSAL NATIONAL STARCH & CHEMICAL CORP. NEWPORT DUMP PALMETTO WOOD PRESERVING PEPPER STEEL & ALLOYS, INC. POTTER'S SEPTIC TANK SERVICE PITS REASOR CHEMICAL COMPANY T.H. AGRICULTURE & NUTRITION CO. (MONTGOMERY PLANT) TRANS CIRCUITS, INC. ACME SOLVENT RECLAIMING, INC. (MORRISTOWN PLANT) ALBION-SHERIDAN TOWNSHIP LANDFILL ARROWHEAD REFINERY CO. BAYTOWN TOWNSHIP GROUND WATER PLUME BENNETT STONE QUARRY BOWERS LANDFILL CONTINENTAL STEEL CORP. DOUGLASS ROAD/UNIROYAL, INC., LANDFILL E.H. SCHILLING LANDFILL EAU CLAIRE MUNICIPAL WELL FIELD FOREST WASTE PRODUCTS FULTZ LANDFILL KOHLER CO. LANDFILL LAUER 1 SANITARY LANDFILL LONG PRAIRIE GROUND WATER CONTAMINATION MAIN STREET WELL FIELD MOTOR WHEEL, INC. NATIONAL PRESTO INDUSTRIES, INC. OAK GROVE SANITARY LANDFILL OCONOMOWOC ELECTROPLATING CO., INC. ORMETCORP. OTT/STORY/COROOVA CHEMICAL CO. OTTAWA RADIATION AREAS OUTBOARD MARINE CORP. PAGEL'S PIT PARSONS CASKET HARDWARE CO. PEERLESS PLATING CO. REFUSE HIDEAWAY LANDFILL ROSE TOWNSHIP DUMP ROTO-FINISH CO., INC. SANITARY LANDFILL CO. (INDUSTRIAL WASTE DISPOSAL CO., INC.) SEYMOUR RECYCLING CORP. SPARTA LANDFILL TOMAH FAIRGROUNDS UNIVERSITY OF MINNESOTA (ROSEMOUNT RESEARCH CENTER) VELSICOL CHEMICAL CORP. (MICHIGAN) VERONA WELL FIELD WAUCONDASAND & GRAVEL WHEELER PIT YEOMAN CREEK LANDFILL CLEVELAND MILL DOUBLE EAGLE REFINERY CO. FOURTH STREET ABANDONED REFINERY FRENCH, LTD. FRUIT AVENUE PLUME GURLEY PIT HARDAGE/CRINER State GA NC NC FL KY NC TN SC NC GA GA KY NC KY SC FL NC NC AL - FL IL Ml MN MN IN OH IN IN OH Wl Ml OH Wl Wl MN IN Ml Wl MN Wl OH Ml IL IL IL (L Ml Wl Ml Ml OH IN Ml Wl MN Ml Ml IL Wl IL NM OK OK TX NM AR OK FYR Type Statutory Statutory Statute ry Statutory Statutory Policy Statutory Statutory Statutory Policy Statutory Statutory Statutory Statutory Policy Policy Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory ' Policy Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Policy Policy Statutory Statutory Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory Statutory Policy Statutory Statutory Fiscal Year Due 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 Date Completed 09/27/2012 06/14/2012 09/26/2012 09/27/2012 09/28/2012 09/28/2012 09/28/2012 09/28/2012 08/29/2012 07/03/2012 09/28/2012 09/26/2012 09/26/2012 06/28/2012 07/19/2012 09/24/2012 09/25/2012 09/28/2012 09/19/2012 09/19/2012 09/20/2012 08/03/2012 08/28/2012 03/29/2012 08/20/2012 05/18/2012 08/30/2012 08/20/2012 07/11/2012 07/17/2012 09/13/2012 07/05/2012 09/14/2012 09/20/2012 08/29/2012 06/21/2012 07/19/2012 09/04/2012 08/29/2012 07/11/2012 05/04/2012 09/12/2012 11/07/2011 06/28/2012 09/20/2012 05/30/2012 07/12/2012 08/29/2012 06/11/2012 04/27/2012 08/13/2012 02/29/2012 08/07/2012 09/10/2012 06/14/2012 09/21/2012 09/18/2012 08/21/2012 09/17/2012 02/24/2012 08/20/2012 05/15/2012 05/15/2012 08/20/2012 12/23/2011 09/21/2012 05/10/2012 Protective/less Determination1 Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Protectiveness Deferred Short-Term Protective Protective Short-Term Protective Short-Term Protective Will be Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Will be Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Not Protective Protective Short-Term Protective Short-Term Protective Short-Term Protective Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Terrn Protective Protective Short-Term Protective Protectiveness Deferred Not Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Short-Term Protective Protective Short-Term Protective Not Protective Short-Term Protective Short-Term Protective Short-Term Protective Not Protective Protective Protective Protective Protective Short-Term Protective Short-Term Protective Protective ------- Region 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 07 08 08 08 08 OS 08 08 08 08 08 08 08 08 09 09 09 09 09 09 09 09 10 10 10 10 10 10 10 Site Name HIGHLANDS ACID PIT INDUSTRIAL WASTE CONTROL MANY DIVERSIFIED INTERESTS, INC, MID-SOUTH WOOD PRODUCTS MOTCO, INC, NATIONAL ZINC CORP. OKLAHOMA REFINING CO. OLD 1NGER OIL REFINERY PAB OIL & CHEMICAL SERVICE, INC. PALMER BARGE LINE SOUTH CAVALCADE STREET STATE MARINE OF PORT ARTHUR ANNAPOLIS LEAD MINE ARKANSAS CITY DUMP CONSERVATION CHEMICAL CO. E.I, DU PONT DE NEMOURS & CO., INC. {COUNTY ROAD X23) FAIRFIELD COAL GASIFICATION PLANT HASTINGS GROUND WATER CONTAMINATION JOHNS' SLUDGE POND LEHIGH PORTLAND CEMENT CO. NORTHWESTERN STATES PORTLAND CEMENT CO. ORON06O-DUENWEG MINING BELT RED OAK CITY LANDFILL SOLID STATE CIRCUITS, INC. SYNTEX FACILITY CALIFORNIA GULCH CHEMICAL SALES CO. DAVENPORT AND FLAGSTAFF SMELTERS GILT EDGE MINE INTERNATIONAL SMELTING AND REFINING LINCOLN PARK LOW RY LAND FILL MONTICELLO RADIOACTIVELY CONTAMINATED PROPERTIES PORTLAND CEMENT (KILN DUST 2 & 3) ROSE PARK SLUDGE PIT SMUGGLER MOUNTAIN WASATCH CHEMICAL CO. (LOT 6) WHITEWOOD CREEK APACHE POWDER CO. FRONTIER FERTILIZER INTEL MAGNETICS JASCO CHEMICAL CORP. MCCOLL SAN GABRIEL VALLEY (AREA 2) SYNERTEK, INC. (BUILDING 1) WATKINS-JOHNSON CO. (STEWART DIVISION PLANT) GOULD, INC. KERR-MCGEE CHEMICAL CORP, (SODA SPRINGS PLANT) LAKEWOOD NORTHSIDE LANDFILL SILVER MOUNTAIN MINE TAYLOR LUMBER AND TREATING WYCKOFF CO./EAGLE HARBOR State TX AR TX AR TX OK OK LA LA TX TX TX MO KS MO IA IA NE KS IA IA MO IA MO MO CO CO UT SD UT CO CO UT UT UT CO UT SD AZ CA CA CA CA CA CA CA OR ID WA WA WA OR WA FYR Type Statutory Statutory Statutory Statutory Statutory Policy Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Discretionary Statutory Statutory Discretionary Statutory Statutory Statutory Policy Statutory Statutory Statutory Statutory Statutory Policy Policy Statutory Statutory Policy Statutory Statutory Statutory Policy Statutory Statutory Statutory Statutory Fiscal Year Due 2012 '• 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 Date Completed 09/27/2012 09/21/2012 09/12/2012 09/27/2012 09/27/2012 11/21/2011 08/20/2012 08/28/2012 07/19/2012 09/11/2012 09/14/2012 09/12/2012 09/24/2012 06/29/2012 09/27/2012 06/26/2012 09/11/2012 08/28/2012 09/21/2012 09/24/2012 07/12/2012 08/29/2012 07/26/2012 09/21/2012 09/28/2012 09/27/2012 09/26/2012 07/24/2012 06/21/2012 09/25/2012 09/27/2012 09/27/2012 06/18/2012 09/26/2012 09/26/2012 07/16/2012 09/25/2012 09/17/2012 09/20/2012 09/26/2012 09/26/2012 09/28/2012 09/28/2012 09/24/2012 09/27/2012 09/27/2012 09/17/2012 09/26/2012 09/24/2012 08/23/2012 09/20/2012 05/15/2012 09/27/2012 Protectiveness Determination1 Short-Term Protective Protective Protective Short-Terrn Protective Short-Term Protective Protective Short-Term Protective Protective Protective Protective Short-Term Protective Protective Short-Term Protective Protective Protectiveness Deferred Protective Protective Protectiveness Deferred Protective Protective Protective Will be Protective Protective Protectiventss Deferred Protectiveness Deferred Will be Protective Short-Term Protective Short-Term Protective Not Protective Protective Short-Term Protective Protective Protective Short-Term Protective Protective Protective Protectiveness Deferred Short-Term Protective Protective Short-Term Protective Protectiveness Deferred Protective Protective Protective Protectiveness Deferred Short-Term Protective Protective Not Protective Short-Term Protective Short-Term Protective Short-Term Protective Protective Will be Protective Federal Facility Reviews Due and Completed in FY 2012 Region 01 01 01 01 01 03 03 Site Name HANSCOM FIELD/HANSCOM AIR FORCE BASE NATICK LABORATORY ARMY RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER NEW LONDON SUBMARINE BASE PORTSMOUTH NAVAL SHIPYARD SOUTH WEYMOUTH NAVAL AIR STATION FORT GEORGE G. MEADE [OU 21) INDIAN HEAD NAVAL SURFACE WARFARE CENTER State MA MA CT ME MA MD MD FYR Type Statutory Discretionary Statutory Statutory Statutory Discretionary Statutory Fiscal Year Due 2012 2012 2012 2012 2012 2012 2012 Date Completed 09/26/2012 04/12/2012 12/19/2011 OS/02/2012 12/22/2011 11/18/2011 09/27/2012 Protectiveness Determination1 Protective Protective Protective Protective Protective Short-Term Protective Protective ------- Region 03 03 03 03 03 04 06 07 08 08 08 09 09 09 09 09 09 09 09 10 10 10 10 10 10 10 Site Name LANGLEY AIR FORCE BASE/NASA LANGLEY RESEARCH CENTER [LAFB PORTION] LETTERKENNY ARMY DEPOT (PDO AREA) NAVAL AIR DEVELOPMENT CENTER (8 WASTE AREAS) NAVAL SURFACE WARFARE CENTER - DAHLGREN T08YHANNA ARMY DEPOT OAK RIDGE RESERVATION (USDOE) TINKER AIR FORCE BASE (SOLDIER CREEK/BUILDING 3001) FORT RILEY MONTICELLO MILL TAILINGS (USDOE) OGDEN DEFENSE DEPOT (OLA) ROCKY FLATS PLANT (USDOE) FORT ORD JET PROPULSION LABORATORY (NASA) LAWRENCE LIVERMORE NATL LAB (SITE 300) (USDOE) [OU1] LAWRENCE LIVERMORE NATL LAB (SITE 300) (USDOE) [OU2] LAWRENCE LIVERMORE NATL LAB, MAIN SITE (USDOE) LUKE AIR FORCE BASE SACRAMENTO ARMY DEPOT SCHOFIELD BARRACKS (USARMY) ADAK NAVAL AIR STATION FORT LEWIS LOGISTICS CENTER HANFORD 100-AREA (USDOE) HANFORD HOC-AREA (USDOE} HANFORD 200-AREA (USDOE) HANFORD 300-AREA (USDOE) IDAHO NATIONAL ENGINEERING LABORATORY (USDOE) State VA PA PA VA PA TN OK KS UT UT CO CA CA CA CA CA AZ CA Ht AK WA WA WA WA WA ID FYRType Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Statutory Fiscal Year Due 2012 2012 2012 2012 2012 2012 2012 L 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 Date Completed 01/23/2012 09/24/2012 09/20/2012 12/14/2011 09/25/2012 03/30/2012 09/27/2012 09/27/2012 06/18/2012 09/27/2012 07/30/2012 09/25/2012 02/17/2012 09/28/2012 09/28/2012 09/28/2012 09/2S/2012 09/04/2012 09/24/2012 03/05/2012 09/28/2012 05/16/2012 OS/16/2012 05/16/2012 05/16/2012 06/30/2012 Protectiveness Determination1 Will be Protective Protective Protectiveness Deferred Protective Protectiveness Deferred2 Not Protective Short-Term protective Protectiveness Deferred Protective Protectiveness Deferred Protective Protectiveness Deferred Protective Short-Term Protective Protective Short-Term Protective Protective Protective Protective Will be Protective Protectiveness Deferred Protectiveness Deferred Protective Will be Protective Not Protective Protective Non-Federal and Federal Facility Reviews Due in FY 2012, Completed in a Prior or later Fiscal Year Region 03 03 04 06 07 09 10 Site Name FORT GEORGE G. MEADE [OU 7]* RYELAND ROAD ARSENIC SITE BRANTLEY LANDFILL DUTCHTOWN TREATMENT PUNT RAILROAD AVENUE GROUNDWATER CONTAMINATION CAMP PENDLETON MARINE CORPS BASE* IDAHO NATIONAL ENGINEERING LABORATORY (USDOE)* State MD PA KY LA IA CA ID FYRType Statutory Statutory Statutory Statutory Policy Policy Statutory Fiscal Year Due 2012 2012 2012 2012 2012 2012 2012 Date Completed 09/27/2011 09/29/2011 02/26/2013 08/17/2011 09/15/2011 08/28/2009 02/07/2011 Protectiveness Determination1 Short-Term Protective Short-Term Protective Protective Protective Protectiveness Deferred Short-Term Protective Will be Protective Non-Federal and Federal Facility Reviews Due in Prior or Later Fiscal Years, Completed in FY 2012 Region 02 03 05 05 06 08 09 10 10 10 Site Name CHEMICAL LEAMAN TANK LINES, INC. LETTERKENNY ARMY DEPOT (SE AREA)* BURLINGTON NORTHERN (BRAINERD/BAXTER PLANT) SPARTAN CHEMICAL CO, ROCKWOOL INDUSTRIES INC. BURLINGTON NORTHERNJSOMERS PLANT) EDWARDS AIR FORCE BASE* AMERICAN LAKE GARDENS/MCCHORD AFB* BANGOR NAVAL SUBMARINE BASE* BANGOR ORDNANCE DISPOSAL (USNAVY)* State NJ PA MN Ml TX MT CA WA WA WA FYR Type Statutory Statutory Policy Statutory Statutory Statutory Statutory Statutory Statutory Policy Fiscal Year Due 2009 2013 2008 2004 2010 2011 2013 201S 2011 2011 Date Completed 08/20/2012 09/24/2012 12/23/2011 09/28/2012 09/21/2012 02/28/2012 09/28/2012 09/28/2012 10/14/2011 10/14/2011 Protectiveness Determination1 Short-Term Protective Protective Short-Term Protective Protectiveness Deferred Protective Not Protective Protective Short-Term Protective Protectiveness Deferred Short-Term Protective Non-Federal and Federal Facility Reviews Due In Current or Prior Fiscal Years, Pending Region 03 09 Site Name FOOTE MINERAL CO. TUCSON INTERNATIONAL AIRPORT AREA State PA AZ FYRType Statutory Statutory Fiscal Year Rue 2011 2010 * Denotes federal facility sits when not expikMy noted ------- 1 For all sites that require a five-year review, a separate protectiveness determination is generally made for each portion or operable unit (OU) of the site. TTie determination that is considered "least protective" is used as the general determination for the review in this report. For example, if one operable unit is protective but another operable unit has protectiveness deferred, the determination for the entire review will be protectiveness deferred. 2 A subsequent five-year review addendum for the site, completed on 07/23/2013, found the remedy to be '.'protective." Protective - The remedy is protective of human health and the environment. Short-Term Protective - The remedy is protective of human health and the environment in the short-term, This statement is generally used when the remedy is protective but requires further actions or institutional controls to remain protective in the long-term. Will Be Protective - The remedy is expected to be protective of human health and the environment upon completion, and in the interim, exposure pathways that could result in unacceptable risks are being controlled. This statement is generally used for remedies that are under construction. Protectiveness Deferred - A protectiveness determination of the remedy cannot be made until further information is obtained. Generally, reviews that include this determination identify both the actions and timeframe necessary to obtain the information so a protectiveness determination can be made through an addendum to the five-year review report. Not Protective - The remedy is not protective of human health and/or the environment. For example, a new exposure pathway may be identified or a remedy may not be able to meet a new cleanup level. Generally, reviews that include this determination identify actions that need to be taken to ensure protectiveness. ------- \ UNITED STATES ENVIRONMENTAL PROTECTION AGENCY 8 WASHINGTON, D.C. 20460 wny - 6 2013 THE ADMINISTRATOR The Honorable Joseph Biden President of the Senate United States Senate Washington, D.C. 20510 Dear Mr. President: I am pleased to submit the enclosed report entitled, ;'FY 2012 Superfund Five-Year Review Report to Congress, " in accordance with the requirements of Section 121(c) of the Comprehensive Environmental Response, Compensation and Liability Act. If you have questions please contact me, or your staff may contact Nichole Distefano, Deputy Associate Administrator for Congressional Affairs at distefano.nichole@epa.gov or (202) 564-1110. Sincerely, Gina McCarthy Enclosure Internet Address (URL) • http://www.epa.gov Recycled/Recyclable • Printed with Vegetable Oil Based Inks on 100% Postconsumer, Process Chlorine Free Recycled Paper ------- \ \ UNITED STATES ENVIRONMENTAL PROTECTION AGENCY | WASHINGTON, D.C. 20460 THE ADMINISTRATOR The Honorable John Boehner Speaker of the House U.S. House of Representatives Washington, D.C. 20515 Dear Mr. Speaker: I am pleased to submit the enclosed report entitled, "FY 2012 Superfund Five-Year Review Report to Congress,'" in accordance with the requirements of Section 121 (c) of the Comprehensive Environmental Response, Compensation and Liability Act. If you have questions please contact me, or your staff may contact Nichole Distefano, Deputy Associate Administrator for Congressional Affairs at distefano.nichole@epa.gov or (202) 564-1110. Sincerely, 6 Gina McCarthy Enclosure Internet Address (URL) • http://www.epa.gov Recycled/Recyclable • Printed with Vegetable Oil Based Inks on 100% Postconsumer, Process Chlorine Free Recycled Paper ------- |