A newsletter about soil, sediment, and groundwater characterization and remediation technologi
       Technology
                   News & Trends
EPA 542-N-14-003 I Issue No. 67
Fall 2014
This issue of Technology News & Trends highlights characterization and remediation strategies for contaminated
sediment, which impairs the uses of many water bodies and is often a contributing factor to the thousands offish
consumption advisories that have been issued nationwide. As of December 2012, remedies for 70 large sediment
sites were selected under the Superfund program and Superfund evaluation was underway for another 50 sites
(OSWER Directive 9200.2-128FSV Difficulties in contaminated sediment cleanup are often associated with the
variability of contaminant occurrence or transport due to changing surface and near-surface water conditions, the
adequacy of characterization tools or techniques, or limitations of remediation technologies employed in
subaqueous settings. Site-specific projects described in this issue demonstrate development, testing or full-scale
use of innovative technologies and approaches for addressing these issues.
FEATURED ARTICLES
Characterization and Testing: Mapping of Sediment Particle Size with In Situ Friction Sound Probe

Contributed by Bart Chadwick and Ernie Arias, U.S. Navy SPAWAR Systems Center

The U.S. Navy's Space and Naval Warfare Systems Command, together with federal and private partners,
recently field-tested a sediment friction sound probe (SED-FSP) prototype designed to improve in situ
classification of surface sediment type over a broad range of applications and conditions. The SED-FSP
technology, developed in 2012 for the Navy by Zebra-Tech, Ltd., measures friction sound intensity to derive
particle grain size. Full-scale demonstrations were conducted at three sites: 1) the mouth of Chollas Creek in San
Diego Bay at Naval Base San Diego, a contaminated sediment site; 2) in San Diego Bay at North Island Naval Air
Station Installation Restoration (IR) Site 9, a groundwater-surface water interaction site; 3) and the Anacostia
River in  Washington, DC, a contaminated sediment capping site. The probe exceeded performance criteria —
reliability, efficiency, and specificity — by 5 to 17 percent. Overall demonstration results suggest that the SED-
FSP can offer a more cost-effective and efficient method of analyzing in situ grain size when compared to
traditional techniques, such as sieving and sedimentation, laser diffraction, electro-zone sensing, and microscopy.

Grain size can provide valuable information for identifying contaminated sediment and contaminant discharge
zones at sediment study sites. Traditional techniques for determining sediment grain size, which include
laboratory analyses of core or grab samples, are time- and labor-intensive, and the turnaround time between
sample collection and analysis can delay site characterization. Friction sound technology, such as the SED-FSP,
offers a simple, quick and robust technique for measuring sediment (and soil) grain size by measuring  friction
sound intensity at the particle/sensor interface, which is  correlated with particle radius.

The SED-FSP uses an acoustic microphone placed
in the tip of a 1-meter-long, 1/2-inch-diameter
stainless steel probe that responds to friction sound
intensity as the probe tip penetrates the sediment.
The microphone is embedded in a %-inch Delrin®
plastic section (Figure 1) that is designed to
acoustically isolate the microphone from the rest of
the SED-FSP assembly.

The probe is driven into the sediment by a
pneumatic piston/cylinder drive unit mounted on an
aluminum frame assembly. The SED-FSP probe tip
                                               I
                                                 Figure 1. Acoustic probe tip and microphone
                                                 embedded in the Delrin isolator.

-------
penetrates the sediment at a constant speed to a depth of up to two feet. The probe acquires an acoustic signal,
while an onboard camera attached to the frame provides real-time video to help the operator avoid obstructions
and ensure that penetration is occurring at a constant rate. The acoustic signal is fed to an onboard electronics
package that captures, filters and determines the sound amplitude over a predefined time interval (Figure 2). The
processed data is then transmitted to storage and processing software on the operator's computer that displays a
plot of the processed signal as a function of time. For surface sediments, grain size is determined by identifying
the SED-FSP response output associated with the top sediment layer and calculating the average of the
responses.  Subsurface sediment grain size is determined by associating SED-FSP output with subsurface depth,
which is accomplished by identifying penetration speed and the acoustic response time signature.
                    Figure 2. Commercial prototype SED-FSP setup
Sites were selected for demonstrations were
based on potential applications for the SED-
FSP. Conditions at Chollas Creek were well-
suited for identifying areas of fine sediment,
which can be associated with higher
contaminant concentrations. IR Site 9
provided a suitable location for identifying
potential groundwater discharge  points
(Figure 3), and the Anacostia River site was
selected to help delineate between the thin-
layer sand cap and underlying native
sediments.

The SED-FSP was deployed at 23 locations
at the Chollas Creek site during October 25 -
28, 2010, including three replicate validation
stations where additional deployments were
made to determine the ability of the system
to replicate results. Although some
penetration resistance was encountered,
less than five minutes was required per
deployment once the probe was  at a
sampling station. Surface sediment grain
sizes were determined by averaging SED-
FSP responses corresponding to the top six
inches of the sediment bed.  Samples
Figure 3. The North Island Naval Air Station ground-surface
interaction site location on the shore of the San Diego Bay.

-------
obtained from all 23 locations also were analyzed using standard methods to validate results obtained using the
probe.

At IRSite 9, the SED-FSP was deployed at 123 locations during May 10-14, 2011, including three replicate
validation stations, along 12 offshore transects encompassing a previously identified groundwater discharge zone.
The SED-FSP accurately predicted grain size at all stations except those probed at low tide, when sediment was
exposed above the water level. These data points were excluded from the analysis of the results. Several
deployment attempts at near-shore locations were abandoned due to resistance to the probe. The vertical
profiling capabilities of the probe were also demonstrated at IR Site 9 through development of grain size contour
maps at 6-inch depth horizons from zero to 24 inches. The grain size patterns illustrated by the maps were useful
in understanding potential groundwater discharge pathways, especially as groundwater approaches the shallow
zone.

Thirty-three locations, including one replicate validation station and eight validation sampling  stations where
sediments were analyzed using conventional methods for comparison to SED-FSP results, were probed using
SED-FSP at the Anacostia River site during February 13-17, 2012. To determine the location of the interface
between cap material and underlying native sediment, a threshold value of SED-FSP response was selected. The
SED-FSP was found to accurately identify grain size and cap thickness. The  probe accurately measured the
intensity of friction sound generated by the sand cap, though it elicited a substantially higher response to
underlying native fine sediment. This response was attributed to insufficient acoustic isolation of the probe tip from
the probe shaft whose friction is picked up by the microphone sensor, despite the presence of the Delrin isolator.

Prior to each deployment in the field, the SED-FSP was calibrated in the laboratory using constructed sediments
of known grain sizes. Pre-deployment calibrations resulted in consistent underestimation of particle size. This
underestimation was attributed to the laboratory method used to calibrate the system as well as the well-sorted
nature of the calibration sediments - a condition unlikely to  be encountered in the field. The underestimation was
corrected by applying site-specific power fit to field data, which was empirically derived from the validation
sampling results. Data were accumulated across all deployments, and will continue to be accumulated, to arrive
at global calibration parameters.

Overall, the SED-FSP met both quantitative and qualitative  performance objectives, which focused on rapid, in
situ classification of surface sediment type over a broad range of applications and conditions. Demonstration
results indicated 92 percent reliability, 85 to 97 percent efficiency, and 90 to 95 percent specificity of the probe,
exceeding the target goal of 80 percent for each criterion. The SED-FSP rapidly provided survey maps delineating
areas of significance, and successfully identified potential groundwater discharge zones, areas of high fines, and
extent and depth of a thin-layer sand cap.

Capital costs for the SED-FSP were $10,000, which  are expected to be recouped within the anticipated 5-10 year
lifespan of the equipment, assuming about 30 uses per year. Maintenance costs are expected to be minimal due
to the low complexity of the technology. The main operating costs are associated with labor and the number of
personnel  required for navigation and equipment handling, which varies depending on the site.  In comparing a
hypothetical survey using the SED-FSP with a survey employing traditional methods of sample collection  and
grain size analysis, labor costs were estimated to be similar ($11,280 and  $11,050, respectively). The difference
in material and analytical costs is more substantial, however, with the costs associated with SED-FSP estimated
to be approximately one-fourth those of traditional methods. This is attributed primarily to differences in the
number of samples submitted for validation analysis.

Although the SED-FSP is limited to a single characteristic indicator of grain size, advantages include potential
cost savings, ability to implement adaptive sampling  strategies due to in situ data collection, and cost-effective
assessments of remedies such as thin-layer caps and amendments. In the future, the SED-FSP will be deployed
at Marine Corps Base Quantico,  Virginia, where a thin-layer cap is scheduled to be installed in 2014. The SED-
FSP will be used to verify placement of the cap.

-------
New Remediation Technology: Bioreactive Mat for Treatment of Chlorinated Volatile Organic
Compounds in Wetlands at Aberdeen Proving Ground, MD

Contributed by Michelle M. Lorah, U.S. Geological Survey, Duane Graves, Geosyntec Consultants, and Emily H.
Majcher, Bluestone Environmental Group

The U.S. Geological Survey (USGS) and Geosyntec Consultants, in cooperation with the U.S. Army Garrison at
Aberdeen Proving Ground (APG), Maryland, developed and pilot-tested a permeable reactive mat to treat
chlorinated volatile organic compounds (VOCs) discharging from groundwater seeps into the tidal wetlands along
West Branch Canal Creek at APG. The biomat and dechlorinating microbial consortium ("West Branch
Consortium-2" or WBC-2™) used for bioaugmentation were developed specifically for the APG site because of
the limited in situ remediation options for sensitive wetland environments. WBC-2 was formulated to maximize
natural attenuation processes observed in nearby wetland sediments. The majority of the pilot test occurred from
October 2004 through October 2005, with follow-on performance testing in September 2008. One year of
monitoring indicated chloromethane, chlorinated ethene, and ethane median mass removal ranging from 94 to 98
percent, while samples collected in 2008 indicated sustained methanogenesis and VOC treatment four years after
installation. The WBC-2 culture and reactive mat were developed through a Cooperative  Research and
Development Agreement between USGS and Geosyntec.

Groundwater in areas of APG is contaminated with a mixture of chlorinated solvents, including  1,1,2,2-
tetrachloroethane  (TeCA), trichloroethene  (TCE), tetrachloroethene (PCE), carbon tetrachloride and chloroform.
Total VOC concentrations in  shallow groundwater ranged from about 50,000 to just over  100,000 micrograms per
liter. Previous investigations indicated that groundwater in these areas discharges through natural wetlands to
surface water. In most zones, contaminants seep slowly through the wetlands and are naturally attenuated in the
sediments. However, in several localized zones and above areas of the aquifer with  dense non-aqueous phase
liquid, groundwater seeps rapidly through sediment to surface water without adequate biodegradation or
attenuation.

Contaminated groundwater near or beneath wetland sediments strains the viability of many common remedial
technologies due to economic and practical issues associated with their construction and operation, particularly if
a complementary goal of the remedy is minimal adverse effect on the surrounding wetland ecosystem. Enhanced
bioremediation approaches specifically designed for use in wetlands, such as the reactive mat  and WBC-2
bioaugmentation culture,  require minimal alteration of wetlands, no mechanical equipment, limited maintenance,
and effective treatment of chlorinated VOCs.
The reactive mat was designed to optimize chlorinated VOC degradation efficiency without altering the wetland
geotechnical and hydraulic characteristics, or creating undesirable water quality. Optimized degradation efficiency
was achieved through the selection of a sustainable organic reactive matrix, electron donor, and bioaugmentation
method. Consideration of geotechnical compatibility through design calculations of bearing capacity, potential
settlement, and geotextile selection showed that a 2- to 3-feet tolerable thickness of the mat was possible, with
0.17 feet of settlement predicted for unconsolidated sediments 1.5 to 6 years following installation.
In October 2004, the mat was installed in seep area 3-
4W by removing the top 12 inches of wetland sediment
with a vacuum truck and replacing it with biomat
materials (Figure 1). Measuring 22 inches thick, the mat
was divided into two reactive zones (Figure 2) - a 10-
inch lower zone overlying the sediment designed  to
enhance abiotic degradation of chlorinated methanes,
and a 12-inch upper zone designed to enhance
biodegradation of the remaining chlorinated methanes,
ethanes, and ethenes. A nonwoven geotextile with a
cross-plane flow greater than that of the native
sediments was installed as the base of the mat. Another
nonwoven geotextile was installed between the upper
and lower zones to improve laminar flow conditions.
                                                         7£C1845"
                                                                                           76 1B'3Cf'
Seep area
  3-4W	*A
    Floating
    walkways^

    WETLAND
                    Natuial
                   Attenuation
                   Study Area
                                                     Figure 1. Seep area 3-4W along West Branch Canal
                                                     Creek at APG.

-------
         12 in

         ' .11-i
                       ,Zone 1
    Pea grave) << 1 «i}  Dnp(ubing tetwsen norwrwen gijcitextile
   	/              ;ficirwKAfen gsotextile
'.'ARTESjANjFLOW
FO
                             /V
                                      .Land sutae
                                                            10-15'
                                                            Wetland
                                                            Sediments
           Figure 2. Reactive biomat at APG with a bioaugmented upper organic zone and a lower
           zone designed to enhance abiotic degradation of contaminants.
To ensure hydraulic compatibility in the mat design, materials selected for the organic reactive matrix had a
hydraulic conductivity greater than the surrounding sediments. The matrix is a mix of commercially available
nutrient-rich compost (Chesapeake Blue Crab), reed sedge peat and sand in a 1.5: 1.5: 1 ratio to safeguard
against fluidization. The organic materials were also analyzed for metal concentrations to evaluate water quality
compatibility. The analysis showed that concentrations of metals in the materials ranged from one-half to one
order of magnitude below consensus-based probable effect concentrations in sediment.

The presence of chlorinated methanes in the groundwater (carbon tetrachloride and chloroform) prompted
augmentation of the lower zone of the biomat with zero-valent iron to promote simultaneous abiotic and biotic
degradation. Column  experiments used to evaluate possible amendments to the reactive mat showed similar
contaminant attenuation efficiency with and without the addition of iron, but it was included in the field test as a
safeguard for periods when colder temperatures could decrease microbial activity.

The upper zone of the reactive mat was bioagumented with 0.5 percent WBC-2 culture (currently available as KB-
1®Plus)  by volume to  promote anaerobic biodegradation of contaminants. WBC-2 was developed  by enriching
wetland sediment collected from the study area where rapid and complete reductive dechlorination naturally
occurs. The culture contains up to 21 bacteria phylotypes, including dechlorinating Dehalococcoides and
Dehalobacter strains. Bench-scale experiments indicated that WBC-2 is capable of fully dechlorinating TCE, PCE,
TeCA, 1,1,2-trichloroethane, cis- and frans-1,2-dichloroethene, 1,1-dichloroethene, and vinyl chloride, to non-
chlorinated end-products ethene and ethane. Degradation of RDX and chlorinated benzenes by WBC-2 also was
observed.

The mat was monitored several times per month from November 2004 through September 2005. Samples also
were collected  once in September 2008 to evaluate performance four years after installation. Monitoring showed
rapid onset of and sustained methanogenic conditions conducive to anaerobic biodegradation and dechlorination
by WBC-2. Within the 1.5-foot-thick zone between the base of the  mat and the middle of the organic zone, a
median  mass removal of 98 percent of chloromethanes and 94 percent of chloroethenes and ethane was
observed during the first year of performance monitoring. Minimal mass removal was observed  within the
underlying 12-  to 15-foot thick wetland sediment. Additionally, water quality monitoring for pH, specific
conductance, nutrients,  major ions, and metals indicated that the mat did not adversely affect the water in the
wetland sediments surrounding the reactive mat, or the nearby surface water.

Following mat installation, transient appearance of daughter VOCs associated with degradation, including TCE,
c/s-1,2-dichloroethene, vinyl chloride and methylene chloride, was observed in groundwater within the mat (Figure
3). End products ethene and ethane were also consistently detected in some areas of the mat throughout the
monitoring period. An apparent decrease in chlorinated VOC degradation (Figure 4) and methane production
occurred in late winterto early spring of the monitoring period, consistent with an anticipated decline in microbial
activity during cold weather.

-------
                (A)
           (B)
                      CONCENTRATION, IN MICROMOLAR

                          5     10     15
                 CONCENTRATION, IN MICROMOLAR

               0   20   40   60  80   100  120
                                              EXPLANATION
                                 > vc
                                 i rrareM,2-DCE
                                 . CB-1.2-DCE
TCE
TCA
PCE
• PCA  «—» HCA
 DCA  D—n ETHENE
• TeCA  *•••* ETHANE
 MeCI
I CF
. CT
                 Figure 3. Treatment of chlorinated ethenes and ethanes (A) and chlorinated
                 methanes (B) in seep water by the reactive mat.
Hydraulic head gradients in and around the
reactive mat remained vertically upward at 0.20
to 0.26 feet/foot following mat installation,
consistent with pre-installation calculations.
Horizontal hydraulic gradients remained at least
one to two orders of magnitude lower than the
vertical hydraulic head gradients. Despite the
dominantly vertically upward head, an aerial
thermal infrared flight during winter 2005
showed that the reactive mat was not warmer
than surrounding wetland sediments, as
observed on flights over the seep area prior to
mat installation (Figure 5). Other seep areas in
the vicinity of the biomat-treated seep were
consistent with previous flight imagery.
Porewater sampling indicated that transport of
VOCs had not shifted to these nearby seeps
indicating that the design goal of normalizing
flow across the mat without affecting flow in the
surrounding wetland was achieved. Surface
elevation measurements showed an average
mat surface settlement of approximately 0.25
feet after 10 months, which was near the
predicted settlement for unconsolidated
sediment.

Overall, the demonstration showed that the
design goal of at least 90 percent mass removal of
total chlorinated VOCs was achieved and
maintained for one year without undesired
geotechnical, hydraulic, or water quality effects on
the wetland and tidal creek. Monitoring conducted
   ^g   350

   o o   30°

   ^|§250
   -7 "O
   g OS  200

   < < K  im
   £ O O  I3U
   t CCS
   go 2  100

   IP   50
     O
           (A)
      Nov. 1,
       2004
             (B)
                    War. I,
                     2005
May 1,
 2005
   DATE
         Jun. 1,
          2005
Aug. 1,
 2005
Sep. 1,
 2005

<
b
H
LJ_
0


y
<
c
1-
z
1 1 1
n
Z
0
o


u

O
CL
0
O

?
<
en
cc
O
u
§
y




cc
5
0

0
LL
0

7*






300
250



150

100

50
i i i i i i













^**~-— ~B-^
Mov. 1, Jan. 1, Mar. 1, Mayl, Jun.1, Auq. 1, Sep. 1,
2004 2005 2005 2005 2005 2005 2005
    Figure 4. Seasonal changes in total VOC concentration
    below the reactive mat (A) and in the middle of the mat
    (B). Individual symbols indicate measurements at
    different sampling locations in the mat.

-------
four years after installation confirmed several positive
attributes of the technology, including sustained treatment of
chlorinated VOCs with no maintenance or addition of
amendments required, sustained methanogenesis within the
mat,  and geotechnical stability of mat materials. In addition,
methanogenic conditions were found beneath the mat, which
is speculated to have expanded dechlorinating activity. The
biomat also had no adverse effects on vegetation, as
indicated by a normal pattern of plant succession and similar
plant diversity and growth on the biomat compared to the
surrounding wetland.

Since the wetland pilot test, additional bench- and pilot-scale
tests have shown that WBC-2 seeded bioreactors can
degrade chlorinated VOCs in groundwater treatment plants
at APG. The WBC-2 culture combined with lactate injection
also  has been tested in a fractured rock aquifer at White
Sands Missile Range, New Mexico, to validate its use for
complete anaerobic degradation of RDX and perchlorate.
Current studies are investigating the potential for WBC-2
dechlorination of trichlorobenzene, dichlorobenzene and
monochlorobenzene in wetlands at the Standard Chlorine
of Delaware, Inc. Superfund site in New Castle County,
Delaware.
Figure 5. Thermal infrared imagery showing
the temperature disparity between two
groundwater seep areas and the surrounding
environment. The reactive mat was installed
on the surface of seep 3-4W.
Previously Published in:
Majcher, E.H., Lorah, M.M., Phelan, D.J., and McGinty, A.L., 2009. Design and performance of an enhanced
bioremediation pilot test in a tidal wetland seep. West Branch Canal Creek, Aberdeen Proving Ground, Maryland:
U.S. Geological Scientific Investigations Report 2009-5112, accessed May 28, 2014.
Long-Term Performance: Multi-Component Containment System for Contaminated Sediment in
North Portland
Contributed by Scott Manzano, Oregon Department of Environmental Quality, and Rich Muza, U.S.
Environmental Protection Agency

Cleanup over the past 18 years at the 64-acre McCormick & Baxter site on the shore of the Willamette River in
north Portland, Oregon, involves an integrated system of multiple components for contaminant containment. The
entire site is capped, with an upland cap that extends to the riparian area along the shoreline where it meets a 23-
acre sediment cap beneath the river. The soil and sediment caps operate in conjunction with an impermeable
vertical engineered barrier (VEB).  Results of the site's third five-year review indicate the remedy is performing
effectively after resolution of problems associated with escape of non aqueous-phase liquid (NAPL) from the river
sediment.

McCormick & Baxter Creosoting Company operated at the site between 1944 and 1991, treating wood products
with creosote, pentachlorophenol (PCP), and a variety of water- and ammonia-based solutions containing arsenic,
chromium, copper and zinc. Process wastewaters were discharged directly to the Willamette River, and other
process wastes were dumped in several onsite areas. Site investigations beginning in the late 1980s revealed
high concentrations of heavy metals, polycyclic aromatic hydrocarbons, and PCP at depths reaching 80 feet
below ground surface (bgs) in soil and groundwater and to 35 feet below the riverbed sediment surface.

Initial cleanup work at this National Priorities List site included excavation and offsite disposal of approximately
32,604 tons of contaminated surface soil and debris. NAPL releases to the subsurface from former aboveground
tanks that stored creosote and other wood-treatment chemicals was recovered through a pilot-scale extraction
and treatment system in 1989-2000; manual NAPL  recovery was then conducted until early 2011.  In 2003-2004, a
subsurface  VEB was constructed to fully encompass 18 acres containing NAPL-impacted groundwater and the
main contaminant source areas, including the former tank farm and disposal areas; the total length of the wall is
3,792 linear feet, and the depth varies from approximately 45 to 80 feet bgs.

-------
A RCRA-compliant impermeable cap was then constructed over contaminated soil in an upland area covering
approximately 15 of the 18 acres contained within the VEB (Figure 1). The remaining three acres, located in the
riparian zone along the river, were covered with an earthen cap as part of the sediment cap construction.
Eighteen monitoring wells within the 6-acre riparian zone were abandoned to assure continuity of the cap. Thirty-
six other monitoring wells were modified to  meet Oregon water resource requirements; for example, well casings
were added and surface casings were raised to accommodate the soil cap thickness.
                          LEGEND
                          O Subsurface Barrier Wall
                          n Sediment Cap Boundary
                          • Granular Organophilk Clay
                           Oganoclay TM Reactive Core Mats (Double)
                          • OrganoclayTM Reactive Core Mats (Single)
                          • Thtckened Sand Layer
                          • Boulder Clutters
• Riprap Armor
• Articulated Concrete Block
  6-inch Minus Rock Armor
• 10-Inch Minus Rock Armor
  Impermeable Cap
i'.1.; Earthen Soil Cap Boundary
  Figure 1. Aerial schematic of multi-component containment system operating at the McCormick & Baxter site.


The earthen soil cap consists of a minimum 2-foot-thick layer of imported topsoil installed on 19 acres outside of
the VEB area and on an additional six acres of soil in the riparian zone. A swale in the cap conveys stormwater
directly to an onsite retention/infiltration pond. Several thousand native trees and shrubs were planted throughout
the drainage swale and riparian zone to help stabilize the soil against stormwater erosion and river flood erosion,
and to evapotranspire rainwater to reduce percolation into groundwater.

The 23-acre sediment cap consists of a 2-foot-thick layer of sand over most of the cap footprint; a  5-foot-thick
sand layer was placed  in several more  highly contaminated areas. Over four months in 2004, approximately
131,000 tons of sand was placed. In the former tank farm area with NAPL seep, as well as the Willamette Cove,
the cap incorporated 600 tons of bulk organophilic clay (ET-1 Activated Clay®) to prevent breakthrough of NAPL
through the cap. Organophilic clay generally consists of bentonite or hectorite that is modified to increase
hydrophobic properties and affinity for organic compounds.

-------
The sediment cap incorporated different types of armoring
to prevent erosion of the sand and organophilic clay layers.
The specific armoring material and where it was installed
depended on the expected hydraulic and physical
environments such as currents and wave or erosive
energies. Articulated concrete block (ACB) mats were
installed along the shoreline and in shallow water where
erosive forces would be the greatest due to wave action
(Figure 2). Sizing of rock emplaced as armor included 6-
inch-minus, 10-inch-minus, and riprap. All shallow water 1 Cl-
inch-minus and ACB armoring layers were underlain with a
woven geotextile fabric and a 4-inch-thick layer of 3-inch-
minus filter rock (Figure 3). This fabric and rock layer was
installed to hinder sand migration through the larger and
more  porous armoring layer(s).
Figure 2. Exposed ACB and sand cap armoring
at the McCormick & Baxter site.
               Surface Water Sample
               (-1" above cap surface)
                                                    Inler-Armor S
                                                    (wilhin arrror layer)
                     (-6- into s;i- :J c :-jp
  2'lo5
                                                                           Articulated Concrete Block
                                                                           Rock Armoring
                                                                           [6 lo 24 Inches thick)
                                                                           Geotextile Filter Layer

                                                                           3-inch minus Filter Rock
                                                                           (4 inches thick)
                Sand Cap
                [2 to 5 feet thick. 1 fool Ihiek
                where organophillc clay was
                used)
                                                                           Organophilic Clay
                                                                           (in areas wtiere potential
                                                                           creosote seeps were identified,
                                                                           ~1 foot Ihick)

                                                                           Native (contaminated)
                                                                           Sediment
                                                                        Pwli Part Ptro VMv SMvhr

                                                                        Sown tarval
                Figure 3. Cross-section of sediment cap installed at the McCormick & Baxter site.


Approximately 23,250 tons of 6-inch-minus cobble were placed over the sand cap and as edge treatment where
the 6-inch-minus cobble areas abutted the ACB. Approximately 23,300 tons of angular 10-inch-minus rock were
placed in the near-shore embayment. The riprap used for the boulder clusters and the rock mound is composed
of durable angular boulders less than 3 feet in diameter. Approximately 558 tons of riprap was placed along the
shoreline and on an offshore shoal between the embayment and the river. Each boulder cluster consisted of six to
seven boulders.
Installation of the sediment cap was completed in 2005. Post-construction inspections revealed ebullition-induced
sheen on surface water directly above the sediment cap. In the following year, sheen also was observed along
the site's shoreline. The observations prompted examination of the potential migration pathways for contaminants
(Figure 4.)

-------
   WM1AMFTO RIVER
            f      SefiSMwm
      -."           «-a,™ If,
                 .
      I    /
      ".   /•-•. -

            ^

                                                                                            •flConaPtc
                                                                                            wring

                                                                                         Hock Vrnoring


                                                                                         GiwtfwWCf Mv*rtc<
  Figure 4. Conceptual Model of Contaminant Transport at the McCormick & Baxter site.
To mitigate the sheen, approximately 24,150 square feet of laminated matting containing Organoclay (Reactive
Core Mat™) was emplaced in three target areas along the shoreline and within shallow near-shore water and
covered with sand and rock armoring. A comprehensive study was conducted from 2007-2009 to determine the
potential source and nature of the sheen; the study included porewater and sediment core sampling and chemical
and biological sheen analysis in the vicinity of sheen observations. Flux chambers were deployed in select
locations to collect surface water and air samples. A high correlation was
found when comparing observed locations of ebullition/sheen to areas where
bulk organophilic clay had been placed in the sediment cap. In these areas, it
was determined that degradation of the organic material within the
organophylic clay periodically released gas that created a pathway for NAPL   9**^**SFktt'4llB**-*~-
to surface water where it was expressed as small but visible sheen bursts. It                       _* "
was concluded that sheens found along the shoreline were most likely due to
higher concentrations of iron in groundwater discharge. To date, no further
sheen bursts have been observed in surface water, and the rate of ebullition
through the cap has diminished significantly.

Solid phase micro-extraction (SPME) passive samplers were deployed in
2010 at 22 locations overlying the sediment cap and at two background
surface water locations to  establish a monitoring baseline.  Each point was
sampled 6 inches into the  armoring layer as well as 6 inches and 12 inches
into the sand cap layer (Figure 5).

Sediment cap monitoring has also involved several bathymetric surveys and
diver inspections. Differencing survey images and inspections led to cap
improvements such as placement of additional rock armor and Organoclay
reactive core mats in some areas. In addition, visual inspection of the ACB in
the sediment cap has revealed gaps in some areas due to accumulation of
sharp objects and debris. Significant gaps have been filled with grout; in areas
highly susceptible to ongoing wave action, gravel also may be added.
Figure 5. Sample collection in
sub-armor of the sediment
cap at the McCormick &
Baxter site.

-------
Overall, the sediment cap remains effective, with no evidence of significant contaminant breakthrough to the near
surface environment. Mean concentrations of carcinogenic polycyclic aromatic hydrocarbons (cPAHs) in surface
water, for example, decreased from 0.33 micrograms per liter (ug/L) in 2002 to 0.015 ug/L in 2010 (Figure 6).
           i
                                                                              -cPAHs: Surface Water

                                                                              -cPAHs: Inler-Armoring

                                                                              -cPAHs: Sub-Armoring
                                                                               cPAH RiHcrcncc Crflcrta . D.D3' |.cil. (1 ??i
                                                                               Human Hcallhl	
                                                                          Mate: Open symbols represent all nan-
                                                                          delects (i.e., ttiE concentration
                                                                          represents 1he mean of the memod
                                                                          detection limits).
                                         Dale

  Figure 6. Mean concentrations for total cPAH in surface water, inter-armor water (collected within the rock
  armor), and sub-armor (sand cap) water of the sediment cap at the McCormick & Baxter site.

Through a U.S. Environmental Protection Agency grant received in 2014, Oregon State University researchers
will soon begin to measure Williamette River contaminants within the Portland Harbor Superfund site. Passive
sampling techniques use various types of sampling media in water and sediment for longer periods in order to
better assess pollutant concentrations in specific locations overtime. Oregon State University is currently working
on a plan to use passive samplers at McCormick and Baxter to determine sediment cap performance as  part of
the five -year review to ensure that the remedy remains functional and protective as designed.  That sampling will
be conducted in late summer 2015.
CLU-IN Website: Sediments

The sediments issue area of CLU-IN bundles information relevant to site cleanup involving contaminated
sediments, including key policy and guidance, conceptual site models, fate and transport (including groundwater-
surface water interactions), site characterization and risk assessment. This issue area also provides links to
information resources on remedies such as capping, dredging, and excavation and related strategies such as
institutional controls or monitored natural attenuation.

New Webinar Series: Porewater Concentrations and Bioavailability

The U.S. Environmental Protection Agency (EPA) offers a four-part webinar series on why, how, and when to
measure porewater  concentrations and bioavailability as part of contaminated sediment assessment and
management. The webinar series is hosted jointly by EPA's Contaminated Sediments Forum and the National
Institute of Environmental Health Science's Superfund Research Program. Upcoming webinars will address metals

-------
and passive sampling devices (PSDs) (session III on December 1, 2014) and PSDs for organic contaminants (session IV
on December 15, 2014). The session I and session II webinars are archived on CLU-IN.


EPA Directive: Use of Amendments for In Situ Remediation at Superfund Sediment Sites

EPA compiled this  report (OSWER Directive 9200.2-128FS) to introduce project managers and other cleanup
stakeholders to the most promising amendments for in situ remediation of sediments and to summarize
information on contaminated sediment sites that have already employed these amendments. The report
addresses the use  of amendments alone and  in conjunction with a conventional isolation cap or a thin-layer cap
and enhanced monitored natural recovery. The amendments are designed to treat hydrophobic organic
contaminants, metals or both and in some cases reduce risks from NAPL. The report also discusses associated
costs, placement methods and design considerations such as contaminant fate and transport pathways,
amendment characteristics, and computer modeling.

New ITRC Guidance: Contaminated Sediments Remediation: Remedy Selection for Contaminated
Sediments

The Contaminated  Sediments Team of the Interstate Technology & Regulatory Council (ITRC) recently released
this comprehensive guidance document to offer a remedy selection framework that can help project managers
evaluate remedial technologies for contaminated sediments and develop remedial alternatives based on site-
specific data. Technologies covered include monitored natural recovery and enhanced monitored natural
recovery, in situ treatment,  capping, and dredging/excavation. The document addresses design considerations,
data needs, and monitoring for each technology. As a general reference, this document provides a framework
with elements that  are subject to pertinent federal or state laws and regulations such as those governing
Superfund site cleanup.

ICES  Technical Report Series on  Chemical and Biological Measurements: Determination of
Polychlorinated Biphenyls (PCBs) in Sediment and Biota

This series of technical reports, developed by  the International Council for the Exploration of the Sea (ICES),
describes methods and procedures relating to chemical and biological measurements in the marine environment.
Most of the techniques were selected for documentation based on  performance in ICES or other inter-calibration
or inter-comparison efforts. Determination of Polychlorinated Biphenyls (PCBs) in Sediment and Biota (No. 53)
provides advice on the analysis of PCBs in sediment and biota and addresses sampling and sample handling,
analytical methods, instrumental analysis, and quality assurance. The ICES  is a global network of more than
4,000  scientists working to inform decision-makers on the sustainable use of the marine environment and
ecosystems.

-------