Introduction
The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as
amended, authorizes the US Environmental Agency (EPA) to cleanup the nation's hazardo us
waste sites. Prior to planning and implementing a remedial action (RA), EPA will select one
delivery mechanism from among several available options. The US Army Corps of Engineers
(USACE), because of their extensive experience in real estate activities has been asked to assist
EPA where EPA has determined
Superfund Real Estate
Alternatives Flow Chart
NofrContarimM
Lmd
MirmiM
RmI Estit*
Nm4s
ContaminMd
Laid
Acquisition
Contact
EPA HQ
StaMlnd

Prcjacb

that USACE is the appropriate
supporting agency and that
health based relocation is not
required. Health based reloca-
tions (or emergency relocations)
are beyond the scope of this
document and will be addressed
at a later date.
EPA, under Section 104(j)(l) of
the Superfund Statute, is author-
ized to acquire by purchase,
lease, donation, condemnation,
or otherwise, any real property
needed to conduct a remedial ac-
tion. Recent experience with
real property acquisitions for the
Superfund program has empha-
sized the need for Remedial
Project Managers (RPMs) to an-
ticipate that:
•	Time frames for acquisitions may be long in duration.
•	Site activities may be delayed due to acquisition issues.
•	Initial planning must begin early in the remedial design process.
The process by which property is acquired for the remediation depends upon the remedy selected,
sar
Kcqjm
USACE
lor EPA
(Non-USACE)
USACE
1

-------
the design of the remedy, the parties involved in implementation of the remedy, and the role of the
state in which the site is located. Generally, EPA will only acquire through purchase, lease, dona-
tion, or condemnation, property which is not contaminated. The Enforcement Access Provisions of
104(e) grants EPA the authority to access any real property which is contaminated or threatened with
contamination.
Ini' a "Manning
During ine initial planning phase of the acquisition process, the Region must determine the real estate
needs based on the requirements of the Record of Decision (ROD). In order to make this
determination, the Region will task US ACE with the development of a Real Estate Planning Report
(REPR) in the Interagency Agreement (LAG). The REPR, completed prior to the submission of the
preliminary design for the project, summarizes specific characteristics of the properties needed for
the remedial action (see Summary of the REPR in the sidebar). REPRs are to be developed for all
USACE designs, even when acquisitions are not anticpiated.
Upon reviewing the REPR, the Region in consultation with the Regional Counsel (RC), will
determine those interests to be acquired and then develop a strategy for acquiring those interests (see
Real Estate Decision Flow Chan). The following issues would be considered in the Region's
acquisition strategy:
•	Method of acquisition (purchase, lease, donation, or condemnation).
•	Summary of criteria for determination of acquisition method.
•	Federal funding availability
•	Acquisition schedule
•	Plan for public involvement related to acquisition (coordinated with overall site community
relations effort).
Request and Approval Process
Once the Site Acquisition Strategy has been developed, the Region (with USACE assistance as
needed) will submit a formal request for acquisition to the Assistant Administrator, Office of Solid
Waste and Emergency Response (OSWER) at EPA Headquarters.
This request, based on the site acquisition strategy, must include:
•	A rationale for the required acquisition.
•	The legal description of all parcels.
•	Estimated cost of acquiring the interest
•	The REPR, -
Prior to initiating the request, the Region must verify that the State will agree to accept tide to the
property on or before the completion of the remedial action. The acquisition cannot be completed
until the Superfund State Contract (SSC) is signed.
Headquarters review is coordinated by the Office of Emergency and Remedial Response (OERR).
OERR will evaluate the Region's request to determine if the acquisition is technically feasible and
2

-------
cost effective. Before the Assistant
Administrator approves the request,
the Region must be able to demon-
strate that all reasonable attempts have
been made to limit the acquisition.
Prior to OSWER's approval, the re-
quest v 1 be sent to the Office of
General _ounsel (OGC) whose role is
to concur with the strategy, thereby
ensuring that the acquisition does not
violate or contradict any current EPA
policies or regulations. When both of
these milestones have been reached, a
transmittal memo will be sent from
OERR (thru the Hazardous Site Con-
trol Division) to the Facilities and
Management and Services Division
(FMSD) who will complete the acqui-
sition.
Acquisition
The Facilities Management and Services Division (FMSD), an EPA Headquarters organization, has
the sole authority in the Agency to accept titles and record deeds on behalf of the Federal
Government. This division, with their specialists in real estate, will facilitate US ACE support in the
actual acquisition phase of the project by formally transmitting the acquisition request to the US ACE
Headquarters' real estate division. USACE Headquarters will determine what support is available
and then make the appropriate assignments.
In order for FMSD to perform their role adequately, they will examine the acquisition request and
supporting documentation provided by the Region (in the REPR) to determine whether any
additional information such as detailed property descriptions, surveys, or appraisals are necessary
to complete the acquisition in accordance with existing Federal regulations. Once the USACE
district is formally tasked by USACE Headquarters, the USACE District will prepare and submit an
acquisition implementation plan complete with scheduling requirements to the Region with a copy
to FMSD. The Region with assistance from FMSD, will review the plan and use it in assessing the
status of the project USACE will proceed with the offers to the property owners, negotiate, and
settle, at which time FMSD will accept the title.
Before or upon the completion of remedial activities, EPA will transfer the title to the State. At the
time of transfe£ the Region prepares a memo to FMSD explaining any deed restrictions referenced
in the Record of Decision. FMSD, upon receipt of the memo, will proceed with the transfer.
The acquisition process for USACE performed projects is detailed in the "Real Estate Acquisition
Flow Chart".
Real Estate Decision Flow Chart
Real Eatata
Planning Report (REPR)
Raglonal Review
•	Superfund
•	Regional Council
Land
Owner
Agrees,
Acquisition
Strategy *
HO
¦ HDCnnm
TNmOvUian
« UUCCiMwln
WL
3

-------
I
i
\
Summary of the Major Roles and Responsibilities
•Region requests REPR through the Remedial Design IAG.
•Region review the REPR and devises a strategy for site acquisition.
•Region submits the request to the Assistant Administrator, OSWER.
•OERR coordinates EPA-HQ response on behalf of OSWER.
• O C concurs/nonconcurs with the request.
•OSWER approves/disapproves the request.
•State provides assurances of its intent to accept title.
•OERR prepares transmittal memo to FMSD.
•FMSD tasks US ACE to offer support.
•USACE prepares the final offer and tide.
•US ACE makes the offer, negotiates, and conducts the closing.
•FMSD signs and accepts the tide.
Timetable for 104 (j) Acquisitions
The following real estate acquisitions activities required by the "Uniform Relocation Assistance and.
Real Property Acquisitions Policies Act of 1970" (PL 91-646) normally require the listed durations1
to complete. These time frames should be incorporated into any planning schedules for real estate
acquisitions.
Activity	Duration
Title Evidence	90 Days
Appraisal	90 Days
Fair Market Letter	Following Appraisal
Negotiations	60 Days
Closing	30 Days
TOTAL ESTIMATED TIME	9-10 months
The above time frames do not include the duration for condemning a property after all attempts have
been made to settle with the property owner. Condemnation proceedings which will be initiated by
USACE after receiving approval from EPA, generally takes an additional 80 days to complete.
Real estate needs must be identified early in the design phase of the project to prevent any
unnecessary delays. The RPM can receive real estate support from USACE by requesting a Real
Estate Planning Report in the RD/RA IAG.
This guidance covers the most basic type of acquisitions for EPA involving non-contaminated
properties. When contaminated property is needed to cany out the remedial action, then the Region
must contact EPA-HQ directly for further guidance.
For additional information, please contact Ms. Jo Ann Griffith, EPA-HQ, OSWER, OERR, HSCD
at FTS-475-6704 or commercially at (202) 475-6704.
4

-------
real Estate AcauismoN Flow Chart
initial planning
BEPR
• Sla background
•	Sta boundariaa
•	SMdm of prepwty (Htura*
•	Rouoh aooriiul
•	Currant owiar atltudaa
•	Pubic krvofcamant nw
•	PotantiaJ prettama
Slmpla
Raglonal
Raviaw
yEntaraamanl (104 [t])
Contantkiatad Land
ACQUISITION
APPROVAL	/V (10« |J1>
AND
REQUEST
Norv-ComamJrwtW
L*nd S SHa Acquisition Strategy*
Acqulaltion mathod
Crtarialar mathod lalacMon
Laad aeaney raquiramama
Fadaral funding ivaUbUy
Acquisition achaduta
Ruble Invokwmant
CONDEMNATION
	N
Acquisition
Raqudt
PURCHASE, LEASE
OR DONATION
(104 [JD
DISAPPROVAL
HO Ravtew of AequlaNion
Strategy and REPR
PRELIMINARY
ACQUISITION
APPROVAL
Approval of
f Acquisition
I ,
FIWQ-fcshsdte Acquire |
UMCtto
Roqusete
toPertom
I
USAC8 Ito^yMls Ao^uMliofi
• Lagrt daao^Mn at paraalM
EttMnalpMalMMiM
nXontfatof acquMMsn
• REPR
I
FMSO ACCEPTS TITLE
I
REMEDIAL ACTION
PERFORMED
FMSO TRANSFERS TTTU TO
SWI
Summary of REPR
•	Site Background Information
•	Acreage Needed
•	Site Boundaries
•	Sketches of Property Features
•	Rough Appraisal on Interest to be
Acquired
•	Current Owner Attitudes on Access/
Acquisition
•	Public Involvement Issues
•	Potential Problems
Real Estate Definitions
"Access": a right to enter, pass to and from, obtain or \
make us* of a property Interest or parcel of land.
"Acquisition": obtaining an interest in real property by
means of purchase, donation, transfer, or condemna-
tion activities.
"Casement": a limited right to use another party's land or
property interest for a special purpose such as con-
struction during a remedial action or for purposes of
exploration (surveys, appraisals, test borings, etc.)
necessary to the design of a public works project
"Enforcement Access": the use of SARA 104(e) to gain
access to a contaminated property.
"Interest": share, right or title in property.
"Short-term Interest": a need for involvement at a site
of duration Rmitsd to completion of the Remedial
Action (RA) phase of site cleanup.
"Long term interest": an extended (past duration of RA
construction) limited to completion of the Remedtel
Action (RA) phase of she cleanup.
"Real Estate Planning Report" (REPR): a research
repcrt describing a parcel of land including land Me,
ownership, estimated value and acreage prepared
by USACE to assist EPA Rsgions In decisions re-
garding necessary real estate tor Remedial Actions.
"Right of entry": a permit to enter in, on, over, and across
property or land for a Rmitsd period of time.
S

-------

-------