Industrial User Inspection and Sampling Manual
Disclaimer
This manual is an inspection support tool provided by the U.S. Environmental Protection Agency (EPA)
for use by field personnel conducting inspections under the Clean Water Act (CWA) National
Pretreatment Program. The statements in this document are intended solely as guidance. The statutory
provisions and EPA regulations described in this document contain legally binding requirements. This
Inspection Manual is not a regulation and, therefore, does not add, eliminate or change any existing
regulatory requirements. While EPA has made every effort to ensure the accuracy of the discussion in this
guidance, the obligations of the regulated community are determined by statutes, regulations, or other
legally binding requirements. In the event of a conflict between the discussion in this document and any
statute or regulation, this document would not be controlling.
This document is not intended, nor can it be relied on, to create any rights, substantive or procedural,
enforceable at law by any party in litigation with the United States. This guidance may be revised
without public notice to reflect changes in EPA policy. Deviations from this guidance on the part of any
duly authorized official, inspector, or agent to follow its contents shall not be a defense in any
enforcement action; nor shall deviation from this guidance constitute grounds for rendering the evidence
obtained thereby inadmissible in a court of law. The mention of trade names or commercial products does
not constitute endorsement or recommendation for their use.

-------
Industrial User Inspection and Sampling Manual
Contents
Contents
ACRONYMS	viii
DEFINITIONS	x
1.	INTRODUCTION	1
1.1	Legal Authority and Regulatory Basis for Conducting Industrial User Inspections and Sampling	2
1.2	Purposes and Objectives for Inspecting and Sampling Industrial Users	3
1.3	Outline of the Manual	5
2.	INSPECTING INDUSTRIAL USER FACILITIES	6
2.1	Developing and Maintaining an Inventory or List of Industrial Users	6
2.2	Frequency of Inspections	7
2.3	Types of Inspections	9
2.4	Confidential Business Information (CBI)	9
2.5	Responsibilities of the Inspector	10
2.5.1	Legal	10
2.5.2	Procedural	10
2.5.3	Evidence Collection	12
2.5.4	Safety	13
2.5.5	Professional/Ethical	13
2.5.6	Quality Assurance (QA) Responsibilities	13
2.5.7	Knowledge and Skills	14
2.6	Inspector's Field Documentation	15
2.7	Pre-Inspection Activities	15
2.7.1	Review of Facility Background Information	16
2.7.2	Standard Operating Procedures for Inspections	20
2.7.3	Safety and Inspection/Sampling Equipment Preparation	21
2.7.4	Notification of the Facility	23
2.8	Entry to the Industrial Facility	24
2.8.1	Legal Basis for Entry	24
2.8.2	Arrival for the Inspection	26
2.9	Conducting an Inspection under a Warrant	29
2.10	On-Site Activities	29
2.10.1	Pre-Inspection Observations	30
2.10.2	Opening Conference	30
2.10.3	Physical Plant Review	32
2.10.4	Self-Monitoring Program Review	34
2.10.5	Operations Evaluation	35
2.10.6	Maintenance Evaluation	36
2.10.7	Best Management Practices and Equivalent Mass Limit Provision Review	37
2.10.8	Records Review at the Industrial User Facility	39
2.10.9	Obtaining Copies of Necessary Records	41
2.10.10	Record Identification Procedures	41
2.10.11	Closing Conference	42
2.11	Follow-Up Activities	42
2.11.1	Initiate Follow-up Actions	43
2.11.2	Inspection Documentation	43
2.11.3	Tracking System	44
IV

-------
Industrial User Inspection and Sampling Manual
Contents
2.12 Inspection Checklist and Instructions	44
3.	SAMPLING INDUSTRIAL USERS	57
3.1	Frequency of Sampling	58
3.2	Pollutants to be Monitored	59
3.3	Analytical Methods	60
3.3.1 Alternate Test Procedures and Modified Methods	61
3.4	Sampling and Quality Assurance Plan	62
3.5	Quality Assurance/Quality Control (QA/QC) Procedures	62
3.5.1	Quality Assurance Procedures for Sampling	63
3.5.2	Quality Control Procedures for Sampling	64
3.5.3	Laboratory Quality Assurance/Quality Control	65
3.6	Field Preparation Activities	66
3.6.1	Checklist of Field Sampling Equipment	66
3.6.2	Selection of Sample Containers	66
3.6.3	Cleaning and Preparation of Sampling Equipment	67
3.6.4	Preparing Field Instruments	68
3.7	On-Site Activities	68
3.7.1	Sampling Location	68
3.7.2	Type of Sample	69
3.7.3	General Sample Collection Techniques	72
3.7.4	Sample Volume	75
3.7.5	Sample Preservation and Holding Times	77
3.7.6	Sample Documentation	78
3.7.7	Sample Identification and Labeling	80
3.7.8	Sample Packaging and Shipping	80
3.8	Flow Measurement	81
3.8.1	Open Channel Flow	81
3.8.2	Closed Channel Flow	85
3.8.3	Evaluation of Facility-Installed Flow Devices and Data	87
3.8.4	Evaluation of Permittee Data Handling and Reporting	88
3.8.5	Evaluation of Permittee Quality Control	88
3.8.6	Evaluation of Flow Measurement Compliance	88
3.9	Compliance Issues Related to Sampling and Analysis	89
3.9.1	Duplicate Samples	89
3.9.2	Split Samples	90
3.9.3	Compliance with Monthly Average Limitations	92
3.9.4	Closed Cup Flashpoint and Additional Compliance Sampling	92
3.9.5	POT W Sampling In Lieu of Industrial User Sampling	92
3.9.6	Determining Compliance for Facilities with Multiple Outfalls	93
3.9.7	Violation Date	94
3.9.8	Continuous Monitoring of pH	94
3.9.9	Reporting All Monitoring Results	96
4.	SAFETY CONSIDERATIONS DURING INSPECTION AND SAMPLING
ACTIVITIES	97
4.1	Physical Hazards	97
4.2	Atmospheric Hazards	98
4.2.1 Oxygen Deficient Atmosphere	98
v

-------
Industrial User Inspection and Sampling Manual
Contents
4.2.2	Explosive Atmosphere	99
4.2.3	Toxic Atmosphere	99
4.3	Safety Equipment	100
4.3.1	Protective Clothing	100
4.3.2	Traffic Control	100
4.3.3	Communication Devices	101
4.3.4	Air Monitoring Devices	101
4.3.5	Ventilation Devices	102
4.3.6	Safety Harness and Retrieval System	102
4.3.7	Respirators	102
4.4	Confined Space Entry	103
4.5	Safety Training	104
5. ADDITIONAL RESOURCES	106
Appendix A. General Industrial User Inspection Questions	109
Usage of Chemicals, Cleaners, and Location of Drains	109
Solvents	109
Cooling Waters	109
Boiler Discharge	109
Steam Supply and Noncontact Cooling	110
Discharge Locations and Sampling Points	110
Pre treatment	110
Solids Disposal	Ill
Radioactive Materials	Ill
Appendix B. Industry Specific Questions	112
Appendix C. General Operations and Maintenance Questions	139
Appendix D. EPA Memorandum, The Use of Grab Samples to Detect Violations of
Pretreatment Standards	144
Appendix E. Example Chain-of-Custody Form for Use by POTWs	152
Appendix F. EPA Memorandum, Determining Industrial User Noncompliance Using Split
Samples	154
Appendix G. EPA Memorandum, Application and Use of the Regulatory Definition of
Significant Noncompliance for Industrial Users	160
Appendix H. EPA Memorandum, Compliance with Continuous Monitoring	164
Appendix I. Hazards Associated with Specific Industrial Categories	167
Appendix J. Additional Information on the POTW's Sampling and Quality Assurance Plan	169
Appendix K. Additional Information on Field Sampling Equipment	172
VI

-------
Industrial User Inspection and Sampling Manual
Contents
Figures
Figure 3-1 Profile and Nomenclature of Sharp-Crested Weirs	82
Figure 3-2 Four Common Types of Sharp-Crested Weirs	83
Figure 3-3 Plan View and Cross Section of a Parshall Flume	84
Figure 3-4 Free-Flowing Palmer-Bowlus Flume	85
Figure 3-5 Configuration and Nomenclature of a Venturi Meter	86
Figure 3-6 Electromagnetic Flow Meter	86
Tables
Table 2-1 Procedural Responsibilities of the POTW Inspector	11
Table 2-2 Knowledge and Skills Required of Pretreatment Inspectors	14
Table 2-3 Information to Review Prior to the Inspection	16
Table 2-4 Generic Elements of Standard Operating Procedures for Conducting Inspections	21
Table 2-5 Inspection and Sampling Suggested Equipment/Supplies	22
Table 3-1 Metals Cleaning Procedures	67
Table 3-2 Composite Sampling Methods	71
Table 3-3 Volume of Sample Required for Analyzing Various Industrial Pollutants	75
Table 4-1 Atmospheric Constituents	98
vii

-------
Industrial User Inspection and Sampling Manual
List of Acronyms
ACRONYMS
ATP
Alternate Test Procedure
BAT
Best Available Technology Economically Achievable
BBL
Barrel
BCT
Best Conventional Pollutant Control Technology
BMP
Best Management Practice
BMR
Baseline Monitoring Report
BOD
Biochemical Oxygen Demand
CBI
Confidential Business Information
CFR
Code of Federal Regulations
CIU
Categorical Industrial User
COC
Chain-of-Custody
COD
Chemical Oxygen Demand
CPR
Cardiopulmonary Resuscitation
CROMERR
Cross-Media Electronic Reporting Rule
CWA
Clean Water Act
CWF
Combined Wastestream Formula
CWT
Centralized Waste Treatment
DOT
Department of Transportation
EPA
U.S. Environmental Protection Agency
EMS
Environmental Management System
ERP
Enforcement Response Plan
gpd
Gallons per Day
GHS
Globally Harmonized System of Classification and Labeling of Chemicals
HEM
Hexane Extractable Material
IATA
International Air Transport Association
ICP
Inductively Coupled Plasma Mass Spectrometry
ISO
International Organization for Standardization
LEL
Lower-Explosive Limit
mg/L
Milligrams per Liter
mL
Milliliter
MS
Matrix Spike
MSD
Matrix Spike Duplicate
MTCIU
Middle-Tier Categorical Industrial User
Vlll

-------
Industrial User Inspection and Sampling Manual
List of Acronyms
MUR	Methods Update Rule
NAICS	North American Industry Classification System
NOV	Notice of Violation
NPDES	National Pollutant Discharge Elimination System
NSCIU	Nonsignificant Categorical Industrial User
OSHA	Occupational Safety and Health Administration
O&M	Operation and Maintenance
PMP	Pollutant Management Plan
POTW	Publicly Owned Treatment Works
PPE	Personal protective equipment
ppm	Parts per Million
ppq	Parts per Quadrillion
QA	Quality Assurance
QC	Quality Control
RCRA	Resource Conservation and Recovery Act
SCBA	Self-contained Breathing Apparatus
SDS	Safety Data Sheet (formerly Material Safety Data Sheet or MSDS)
SGT-HEM	Silica Gel Treated Hexane Extractable Material
SIU	Significant Industrial User
SNC	Significant Noncompliance
SOP	Standard Operating Procedures
SUO	Sewer Use Ordinance
TLV	Threshold Limit Values
TOMP	Toxic Organic Management Plan
TRC	Technical Review Criteria
TSS	Total Suspended Solids
TTO	Total Toxic Organics
TWA	Time Weighted Average
UEL	Upper Explosive Limit
IX

-------
Industrial User Inspection and Sampling Manual
Definitions
DEFINITIONS
Accuracy
Accuracy refers to the degree of difference between observed values and known or actual
values in the analysis of wastewater.
Act or "the Act"[40 CFR 403.3(b)]
The Federal Water Pollution Control Act, also known as the Clean Water Act, as amended,
33 U.S.C. §1251 et. seq.
Acute Effects
When the effects of an exposure to a pollutant over a short period of time cause severe health
effects to humans or other organisms, this condition is said to be acute (compare to chronic
below).
Aliquot
A measured portion of a sample taken for analysis. One or more aliquots make up a sample.
Approval Authority [40 CFR 403.3(c)]
The director in a National Pollutant Discharge Elimination System (NPDES) authorized state
with an approved state pretreatment program, or the appropriate EPA regional administrator
in a non-NPDES authorized state or NPDES state without an approved state pretreatment
program.
Baseline Monitoring Report (BMR) [40 CFR 403.12(b)]
A report required following promulgation of a federal categorical standard, pursuant to 40
CFR 403.12(b).
Batch Process
A treatment or manufacturing process in which a tank or reactor is filled, the wastewater (or
solution) is held or a chemical solution is prepared, and the tank is emptied, resulting in a
discrete discharge to the sanitary sewer. The tank may then be refilled and the process
repeated. Batch processes are also used to clean, stabilize, or condition chemical solutions for
use in industrial manufacturing and treatment processes.
Best Management Practice (BMP) [40 CFR 403.3(e)]
A schedule of activities, prohibition of practices, maintenance procedures, and other
management practices to implement the prohibitions listed in section 403.5(a)(1) and (b).
BMPs also include treatment requirements, operating procedures, and practices to control
plant site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw materials
storage.
Biochemical Oxygen Demand (BOD)
The quantity of dissolved oxygen in milligrams per liter (mg/L) in an effluent or other water,
required during stabilization of decomposable organic matter by aerobic biochemical action
as determined by analytical procedures set forth in the Manual of Methods for Chemical
Analysis of Water and Wastes (USEPA, Office of Technology Transfer, Washington, D.C.,
March 1983).
x

-------
Industrial User Inspection and Sampling Manual
Definitions
Biological Treatment
A waste treatment process by which bacteria and other microorganisms break down complex
organic or inorganic (e.g., ammonia) materials into simple, nontoxic, more stable compounds.
Blank (Bottle)
An aliquot of analyte-free water which is taken through the appropriate steps of the analytical
process as a means of determining if the sampling container is introducing contamination into
the sample. For aqueous samples, reagent water is used as a blank matrix; however, a
universal blank matrix does not exist for solid samples (e.g., sludge), and therefore, no matrix
is used.
Blank (Equipment)
An aliquot of analyte-free water which is taken to and opened in the field. The contents of the
blank are poured appropriately over or through the sample collection device, collected in a
sample container, and returned to the laboratory as a sample to be analyzed. Equipment
blanks are a check on the sampling device cleanliness.
Blank (Field)
An aliquot of analyte-free water or solvent brought to the field in sealed containers and
transported back to the laboratory with the sample containers and analyzed along with the
field samples. Field blanks are a check on contamination that may be introduced into a
sample or bottle from the surrounding environment while a container is sealed.
Blank (Method)
An aliquot of analyte-free water prepared in the laboratory and analyzed by the analytical
method used for field samples. Method blanks are used to test for the cleanliness of reagents,
instruments, and the laboratory environment.
Blank (Sample Preservation)
An aliquot of analyte-free water to which a known quantity of preservative is added. This
type of sample is a means of determining the level of contamination of chemical
preservatives after a period of use in the field.
Slowdown
The discharge of water with high concentrations of accumulated solids from boilers to
prevent plugging of the boiler tubes and/or steam lines. In cooling towers, blowdown is
discharged to reduce the concentration of dissolved solids in the recirculating cooling water.
Clean "make-up" water is added to dilute the dissolved solids in the system. Blowdown also
includes the discharge of condensate.
Categorical Industrial User (CIU)
A categorical industrial user is an industrial user (see industrial user definition below) that is
subject to a categorical standard promulgated by the EPA. A CIU is a specific type of
significant industrial user (SIU) (see significant industrial user definition below).
Categorical Standards (40 CFR parts 405-471)
Any regulation containing pollutant discharge limits promulgated by the EPA in accordance
with Sections 307(b) and (c) of the Act (33 U.S.C. §1317) which apply to a specific category
of users and which appear in 40 CFR Chapter I, Subchapter N, Parts 405-471. Not all
XI

-------
Industrial User Inspection and Sampling Manual
Definitions
categorical standards include numerical standards; some have BMPs and some may be zero
discharge. Some categorical standards do not include pretreatment standards for New Sources
or Existing Sources.
Centralized Waste Treatment Facility (CWT) [40 CFR 437.2(c)]
A public or private facility that treats (for disposal, recycling or recovery of material)
hazardous or non-hazardous industrial wastes, hazardous or non-hazardous industrial
wastewater, and/or used material received from off-site. These facilities are designed to
handle the treatment of specific wastes from industry. The waste waters are transported to the
facility for proper storage, treatment and disposal.
Chain-of-Custody (COC)
A legal record (which may be a series of records) of each person who had possession of an
environmental sample, from the person who collected the sample to the person who analyzed
the sample in the laboratory, to the person who witnessed the disposal of the sample. A
POTW may have a chain-of-custody form, sometime referred to as a COC form, for sample
collection that shows custody of the sample up to delivery to the laboratory. Laboratories
often have their own custody procedures and COC forms.
Chemical Oxygen Demand (COD)
Chemical oxygen demand is expressed as the amount of dissolved oxygen consumed from the
oxidation of a chemical during a specific test (in mg/L). The COD is a measure of the
oxygen-consuming capacity of the inorganic and organic matter present in the water or
wastewater. The results of the COD test are not necessarily related to the Biochemical
Oxygen Demand (BOD) because the chemical oxidant responsible for utilizing the oxygen
may react with substances that bacteria do not stabilize.
Chemical Treatment Process
A waste treatment process that involves the addition of chemicals to achieve a desired level
of effluent quality.
Chronic Effects
The effect of a single or repeated exposure to a pollutant that causes health effects over a long
period of time in humans or other organisms (compare to acute effects above).
Code of Federal Regulations (CFR)
A publication of the United States government that contains all of the finalized federal
regulations. Federal environmental regulations are found in volume 40 of the CFR, and the
General Pretreatment Regulations are found at 40 CFR part 403.
Combined Wastestream Formula (CWF) [40 CFR 403.6(e)]
The combined wastestream formula is a means of deriving alternative categorical discharge
limits in situations where process effluent is mixed with waste waters other than those
generated by the regulated process prior to treatment.
Composite (Proportional) Samples
A sample composed of several discrete samples combined in a known proportion. For
wastewater monitoring, a composite sample is a sample composed of several discrete samples
collected at equal time intervals, or proportionally to the flow rate of the discharge.
Xll

-------
Industrial User Inspection and Sampling Manual
Definitions
Confined Space
A space which, by design, has limited openings for entry and exit, unfavorable natural
ventilation that could contain or produce dangerous air contaminants (or create an atmosphere
of oxygen deprivation), and that is not intended for continuous employee occupation. A
permit may be required under OSHA to enter a confined space. Specific language regarding
confined space can be found at:
https://www.osha.gov/pls/oshaweb/owadisp.show document'?!) table=standards&p id=9797.
Conservative Pollutant
Any pollutant that is not significantly degraded by physical, chemical or biological processes
which may occur in a wastewater or other water.
Contributing Jurisdiction
As a general rule, the powers of a municipal entity are limited to its geographic boundaries,
and additional authority will be needed to regulate industrial users located beyond these
boundaries. The U.S. Environmental Protection Agency (EPA) refers to these types of
situations as "multijurisdictional," because industrial users are located within the boundaries
of one or more jurisdictions other than the municipal entity that is charged with program
implementation and enforcement responsibilities.
Control Authority [403.3(f)]
The Control Authority is the jurisdictional entity which oversees the implementation of the
National Pretreatment Program at the local level. Usually, the Control Authority is the POTW
with an approved pretreatment program, but in some cases, the Control Authority may be the
state (e.g., Vermont, Connecticut, Nebraska, Alabama, and Mississippi), or it may be the EPA
(i.e., where there is no local approved program and the state is not authorized to administer
the National Pretreatment Program).
Conventional Pollutant
A water pollutant that is amenable to treatment by a municipal wastewater treatment plant
and which has been designated as conventional under section 304(a)(4) of the Act. These
pollutants include: BOD, total suspended solids (TSS), pH, fecal coliform, and oil and grease.
Daily Discharge (40 CFR 122.2)
The "discharge of a pollutant" measured during a calendar day or any 24-hour period that
reasonably represents the calendar day for purposes of sampling. For pollutants with
limitations expressed in units of mass, the "daily discharge" is calculated as the total mass of
the pollutant discharged over the day. For pollutants with limitations expressed in other units
of measurements, the "daily discharge" is calculated as the average measurement of the
pollutant over the day.
Daily Maximum or Maximum Daily Discharge Limitation [40 CFR 122.2]
The highest allowable "daily discharge."
Duplicate Sample (Field)
A precision check on sampling equipment and sampling technique. At selected stations on a
random time frame duplicate samples are collected from two sets of field equipment installed
at the site, or duplicate grab samples are collected from a single piece of equipment at the
site. The results of the field duplicate samples may be compared to estimate the overall
precision of the entire sample collection and analysis process. This precision check should be
Xlll

-------
Industrial User Inspection and Sampling Manual
Definitions
ongoing while testing, using various control samples. It should not be done after a problem is
detected (once a problem is detected it is too late).
Duplicate Sample (Laboratory)
A sample that is received by the laboratory and divided (by the laboratory) into two or more
portions. Each portion is separately and identically prepared and analyzed. The results from
laboratory duplicate samples check the laboratory precision.
Effluent
Wastewater or other liquid—raw, untreated, partially or completely treated—flowing from an
industrial user to a reservoir, basin, treatment process, or treatment plant.
EPA
The United States Environmental Protection Agency. The principal environmental regulatory
agency established by the Congress to administer the nation's environmental laws.
Existing Source
Any source of discharge, the construction or operation of which commenced prior to the
publication by the EPA of proposed categorical pretreatment standards, which will be
applicable to such source if the standard is thereafter promulgated in accordance with Section
307 of the Act. EPA's memorandum entitled New Source Dates for Direct and Indirect
Dischargers (2006) can be found at http://www.epa.gov/npdes/pubs/newsource dates.pdf to
determine whether a source should be classified as "existing" or "new".
Grab Sample
A sample that is taken from a wastestream without regard to the flow in the wastestream and
over a period of time not to exceed 15 minutes.
Hazardous Waste (40 CFR part 261)
Any waste that is defined or identified as a hazardous waste pursuant to the Federal Resource
Conservation and Recovery Act (RCRA) (42 U.S.C. §§ 6901 et seq.).
Indirect Discharge [40 CFR 403.3(i)J
The introduction of pollutants into a publicly owned treatment works (POTW) from any non-
domestic source regulated under section 307(b), (c), or (d) of the Act.
Inductively Coupled Plasma Mass Spectrometry (ICP)
A type of mass spectrometry that is capable of detecting metals and several non-metals at
concentrations as low as one part per 1015 (part per quadrillion, ppq) on non-interfered low-
background isotopes. This is achieved by ionizing the sample with inductively coupled
plasma and then using a mass spectrometer to separate and quantify those ions.
Industrial User or User (IU) [40 CFR 403.3(j)]
A source of indirect discharge.
Influent
Wastewater or other liquid—raw (untreated), partially or completely treated—flowing into a
reservoir, basin, treatment process, or treatment plant.
xiv

-------
Industrial User Inspection and Sampling Manual
Definitions
Instantaneous Maximum Discharge Limit
The maximum concentration of a pollutant allowed to be discharged at any time, which is
typically determined from the analysis of a grab sample collected at the discharge from the
industrial user.
Interference [40 CFR 403.3(k)]
A discharge which, alone or in conjunction with a discharge or discharges from other sources,
inhibits or disrupts the POTW, its treatment processes or operations or its sludge processes,
use or disposal; and therefore, is a cause of a violation of the POTW's NPDES permit or of
the prevention of sewage sludge use or disposal in compliance with the act or any more
stringent state or local regulations.
Local Limits [40 CFR 403.5(c)]
Effluent discharge limits applicable to significant industrial users or other controlled
industrial users of the Control Authority's system developed by the Control Authority in
accordance with 40 CFR 403.5(c).
Middle Tier CIUs (MTCIUs) [40 CFR 403.12(e)(3)]
CIUs (under the jurisdiction of a POTW with approved streamlining regulations) that do not
discharge categorical wastewater that exceed any of the following:
1.	0.01 percent of the design dry weather hydraulic capacity of the POTW, or 5,000
gallons per day (gpd) whichever is smaller, as measured by a continuous effluent
flow monitoring device
2.	0.01 percent of the design dry weather organic capacity of the POTW
3.	0.01 percent of the maximum allowable headworks loading for any pollutant for
which approved local limits were developed by a POTW.
Monthly Average or Average Monthly Discharge Limitation [40 CFR 122.2]
Highest allowable average of "daily discharges over a calendar month, calculated as the sum
of all "daily discharges" measured during a calendar month divided by the number of "daily
discharges" measured during that month.
National Pretreatment Standard[40 CFR 403.3(1)]
Any regulation containing pollutant discharge limits promulgated by the EPA in accordance
with section 307 (b) and (c) of the Act, which applies to industrial users. This term includes
prohibitive discharge limits established pursuant to §403.5.
New Source [40 CFR 403.3(m)]
1. Any building, structure, facility, or installation from which there is (or may be) a
discharge of pollutants, the construction of which commenced after the publication of
proposed pretreatment standards under Section 307(c) of the Act which will be applicable
to such source if such standards are thereafter promulgated in accordance with that
section, provided that:
a.	The building, structure, facility, or installation is constructed at a site at which no
other discharge source is located; or
b.	The building, structure, facility, or installation totally replaces the process or
production equipment that causes the discharge of pollutants at an existing source; or
c.	The production or wastewater generating processes of the building, structure, facility,
or installation are substantially independent of an existing source at the same site. In
xv

-------
Industrial User Inspection and Sampling Manual
Definitions
determining whether these are substantially independent, factors such as the extent to
which the new facility is engaged in the same general type of activity as the existing
source, should be considered.
2.	Construction on a site at which an existing source is located results in a modification
rather than a new source if the construction does not create a new building, structure,
facility, or installation meeting the criteria of Section (l)(b) or (c) above but otherwise
alters, replaces, or adds to an existing process or production equipment.
3.	Construction of a new source as defined under this paragraph has commenced if the
owner or operator has:
a. Begun, or caused to begin, as part of a continuous on-site construction program;
i.	any placement, assembly, or installation of facilities or equipment; or
ii.	significant site preparation work including clearing, excavation, or removal of
existing buildings, structures or facilities which is necessary for the placement,
assembly, or installation of new source facilities or equipment; or
iii.	entered into a binding contractual obligation for the purchase of facilities or
equipment which are intended to be used in its operation within a reasonable
time. Options to purchase or contracts which can be terminated or modified
without substantial loss, and contracts for feasibility, engineering, and design
studies do not constitute a contractual obligation under this definition.
EPA's memorandum entitled New Source Dates for Direct and Indirect Dischargers
(2006) can be found at http ://www. epa. gov/npdes/pubs/newsource dates. pdf to
determine whether a source should be classified as "existing" or "new".
90-Day Compliance Report [40 CFR 403.12(d)]
A report submitted by categorical industrial users within 90 days following the date for final
compliance with the standards for existing sources and within 90 days following
commencement of the introduction of wastewater into the POTW for new sources. This
report must contain flow measurement (or regulated process streams and other streams),
measurement of pollutants, and a certification as to whether the categorical standards are
being met. Specific requirements for this information are listed in 40 CFR 403.12(d).
Noncontact Cooling Water
Water used for cooling which does not come into direct contact with any raw material,
intermediate product, waste product, or finished product.
Nonsignificant Categorical Industrial User (NSCIU) [40 CFR 403.3(v)(2)]
An NSCIU_never discharges more than 100 gpd of total categorical wastewater (excluding,
noncontact cooling and boiler blowdown wastewater, unless specifically included in the
Pretreatment Standard) and meets the following conditions:
1.	Consistently complies with all applicable categorical requirements
2.	Submits annual certification statement required in 40 CFR 403.12(q)
3.	Never discharges any untreated concentrated wastewater.
NPDESPermit [40 CFR 403.3(n)]
A National Pollutant Discharge Elimination System permit is the regulatory document issued
to a point source that discharges pollutants into waters of the U.S. (e.g., POTWs), pursuant to
section 402 of the Act, by either the EPA or authorized state agency.
xvi

-------
Industrial User Inspection and Sampling Manual
Definitions
Pass Through [40 CFR 403.3(p)]
A discharge which exits the POTW into waters of the United States in quantities or
concentrations which, alone or in conjunction with a discharge or discharges from other
sources, is a cause of a violation of any requirement of the POTW's NPDES permit,
including an increase in the magnitude or duration of a violation.
Periodic Compliance Report [40 CFR 403.12(e) and (h)/
A compliance monitoring report required pursuant to an Industrial Wastewater Discharge
Permit or other control mechanism issued by the Control Authority.
pH
The logarithm of the reciprocal of the hydrogen ion concentration.
Physical Wastewater Treatment Process
Physical wastewater treatment processes include racks, screens, comminutors/grinders,
clarifiers (sedimentation and flotation), and filtration, etc., which, through physical actions,
remove pollutants from the wastewater.
Precision
A measure of agreement among repeated measurements of the same property under identical,
or substantially similar, conditions; expressed generally in terms of the standard deviation.
Pretreatment [40 CFR 403.3(s)J
The reduction in the amount of pollutants, the elimination of pollutants, or the alteration of
the nature of pollutant properties in wastewater prior to, or in lieu of, introducing those
pollutants into the POTW. This reduction or alteration can be obtained by physical, chemical,
or biological processes; by process changes; or by other means, except by diluting the
concentration of the pollutants unless allowed by an applicable pretreatment standard.
Pretreatment Requirements [40 CFR 403.3(t)]
Any substantive or procedural requirement related to pretreatment, other than a National
Pretreatment Standard, imposed on an industrial user.
Pretreatment Standard, or Standard [40 CFR 403.3(1)]
Any regulation containing pollutant discharge limits promulgated by the EPA in accordance
with section 307 (b) and (c) of the Act, which applies to industrial users. This term includes
prohibitive discharge limits established pursuant to § 403.5.
Pretreatment Facility
Industrial wastewater treatment system consisting of one or more treatment devices designed
to remove sufficient pollutants from wastestreams to allow an industry to comply with
effluent limits (i.e., categorical standards, local limits, and federal and local prohibitive
standards).
Priority Pollutants [40 CFR part 423, Appendix A]
The list of pollutants designated by the EPA pursuant to section 307(a)(1) of the Act. The list
of 129 priority pollutants can be found at https://www .epa. gov/eg/toxic-and-prioritv-
pollutants-under-clean-water-act
XVll

-------
Industrial User Inspection and Sampling Manual
Definitions
Publicly Owned Treatment Works (POTW) [40 CFR 403.3(q)]
A sewage (or wastewater) treatment works which is owned by a state or municipality. This
definition includes any devices and systems used in the storage, treatment, recycling and
reclamation of municipal sewage or industrial wastes of a liquid nature. It also includes
sewers, pipes and other conveyances only if they convey wastewater to a POTW treatment
plant. The term also means the municipality as defined in section 502(4) of the Act, which
has jurisdiction over the Indirect Discharges to and the discharges from such a treatment
works.
Quality Assurance (QA)
As applied to sampling and sample analysis, an integrated system of management activities
involving planning, implementation, documentation, assessment, reporting, and quality
improvement to ensure that any samples taken and any analysis performed on those samples
is of the type and quality needed and expected.
Quality Control (QC)
As applied to sampling and sample analysis, the overall system of technical activities that
measure the attributes and performance of sampling and sample analysis against defined
standards to verify that they meet the stated requirements established by the operational
techniques and activities that are used to fulfill requirements for quality.
Process Wastewater [40 CFR 122.2]
Any water which, during manufacturing or processing, comes into direct contact with or
results from the production or use of any raw material, intermediate product, finished
product, by-product, or waste product.
RCRA
The federal Resource Conservation and Recovery Act (PL 94-580). RCRA was enacted to
define a federal role in solid waste and resource management and recovery. RCRA's primary
goals are: 1) to protect human health and the environment from hazardous and other solid
wastes; and 2) to protect and preserve natural resources through programs of resource
conservation and recovery. A principal regulatory focus is on the control of hazardous waste
through a comprehensive system of identification, tracking, treatment, storage, and ultimate
disposal.
Receiving Water
A stream, lake, river, ocean, or other surface or groundwater into which treated or untreated
wastewater is discharged.
Representative Sample
A sample from a wastestream that is identical or nearly identical in composition to that in the
larger volume of wastewater being discharged.
Sewer Use Ordinance (SUO)/Rules and Regulations
Typically, municipalities establish ordinances and districts establish rules and regulations to
implement the Pretreatment Regulations. A sewer use ordinance, or Rules and Regulations, is
a legal instrument, approved by the Approval Authority as part of the Control Authority's
proposed pretreatment program submission that is implemented by a local governmental
entity which sets out all the requirements for the discharge of pollutants into a POTW.
XVlll

-------
Industrial User Inspection and Sampling Manual
Definitions
Significant Industrial User (SIU) [40 CFR 403.3(v)]
A significant industrial user is an industrial user (see industrial user definition above) which
is either: 1) a categorical industrial user; 2) a user which discharges an average of 25,000 gpd
or more of process wastewater to a POTW (excluding sanitary, noncontact cooling and boiler
blowdown wastewater); 3) contributes a process wastestream which makes up 5 percent or
more of the average dry weather hydraulic or organic capacity of the POTW; or 4) is
designated a significant industrial user by the Control Authority.
Significant Noncompliance (SNC) [40 CFR 403.8(f)(2)(viii)]
A significant industrial user (or any industrial user that violates 3, 4, or 8 of this section) is in
SNC if its violations meet one or more of the following criteria:
1.	Chronic violations of wastewater discharge limits, defined as those in which sixty-six
percent or more of all measurements taken for the same pollutant parameter during a
six month period exceed (by any magnitude) the parameter numeric pretreatment
standard or requirement. This is evaluated separately for compliance with
instantaneous, daily maximum, and monthly average limits;
2.	Technical Review Criteria (TRC) violations, defined as those violations in which
thirty-three percent or more of all measurements for the same pollutant parameter
during a six month period equal or exceed the effluent limit by 40 percent (for BOD,
TSS, fats, oil, and grease) or 20 percent for all other pollutants except pH. This is
evaluated separately for compliance with instantaneous, daily maximum, and
monthly average limits;
3.	Any other violation of a pretreatment standard or requirement (daily maximum, long-
term average, instantaneous limit, or narrative standard) that the POTW determines
has caused, alone or in combination with other discharges, interference or pass
through (including endangering the health of POTW personnel or the general public);
4.	Any discharge of a pollutant that has caused imminent endangerment to human
health, welfare or to the environment or has resulted in the POTW's exercise of its
emergency authority to halt or prevent such discharge;
5.	Failure to meet, within 90 days after the schedule date, a compliance schedule
milestone contained in a local control mechanism or enforcement order for starting
construction, completing construction, or attaining final compliance;
6.	Failure to provide, within 45 days after the due date, required reports such as the
baseline monitoring report (see definition above), 90-Day Compliance Report (see
definition above), periodic compliance report (see definition above), and reports on
compliance with compliance schedules, for states and/or POTWs that did not adopt
this less stringent definition (i.e., 45 days) allowed in the 2005 streamlining revision
to the federal regulations reports that are 30 days late are SNC;
7.	Failure to accurately report noncompliance; and
8.	Any other violation or group of violations, which may include a violation of best
management practices, which the POTW determines will adversely affect the
operation or implementation of the local pretreatment program.
Sludge
The settleable solids intentionally separated from liquid wastestreams during treatment
typically under quiescent conditions, and the unintentional accumulation of solids in tanks
and reservoirs associated with production and manufacturing processes.
xix

-------
Industrial User Inspection and Sampling Manual
Definitions
Slug Discharge [40 CFR 403.8(f)(2)(vi)]
Any discharge of a nonroutine, episodic nature, including but not limited to an accidental
spill or a noncustomary batch discharge that has a reasonable potential to cause interference
or pass through, or in any other way violate the POTW's regulations, local limits or permit
conditions.
Slug Discharge Control Plan [40 CFR 403.8(f)(2)(vi)]]
A plan designed to prevent uncontrolled slug discharges into the POTW. A slug plan must
contain, at a minimum:
1.	Description of discharge practices, including non-routine batch Discharges;
2.	Description of stored chemicals;
3.	Procedures for immediately notifying the POTW of Slug Discharges, including any
Discharge that would violate a prohibition under §403.5(b) with procedures for
follow-up written notification within five days; and
4.	If necessary, procedures to prevent adverse impact from accidental spills, including
inspection and maintenance of storage areas, handling and transfer of materials,
loading and unloading operations, control of plant site run-off, worker training,
building of containment structures or equipment, measures for containing toxic
organic pollutants (including solvents), and/or measures and equipment for
emergency response.
Spiked Sample (Field)
A sample of a known amount of a particular pollutant constituent prepared in the field by
adding a known amount of the analyte in question during sampling. This technique identifies
potential sample matrix interference and/or problems with inadequate sample preservation.
Spiked Sample (Laboratory)
A sample of a known amount of a particular pollutant constituent prepared in the laboratory
by adding a known amount of the pollutant in question at a concentration where the accuracy
of the test method is satisfactory. Spiked samples check on the accuracy of the analytical
procedure.
Split Sample (Field)
A sample which is collected and divided in the field into the necessary number of portions
(e.g., 2, 3, etc.) for analysis at different laboratories. Equally representative samples must be
obtained in the process. The split samples are then analyzed by separate laboratories
preferably using the same analytical techniques.
Technology-Based Standards
Direct discharge limits for specific industrial categories established by the EPA based on the
use of the Best Available Technology economically achievable (BAT) or the Best
Conventional Technology available (BCT). Such standards are based on the cost and/or
availability of technology to treat the specific wastestream under consideration.
Toxic Pollutants (40 CFR part 122, Appendix D)
The Toxic Pollutant List specified in 40 CFR 401.15 is a list of 65 pollutant groups
negotiated in a 1976 settlement agreement (NRDC et al. vs. Train, June 9, 1976). This list of
xx

-------
Industrial User Inspection and Sampling Manual
Definitions
pollutant groups was then used to create the original 129 Priority Pollutants List published in
40 CFR 423.
Water Quality Standards
Water quality standards are provisions of state or federal law which consist of a designated
use or uses for a given water body and associated water quality criteria which must be met in
the stream to achieve these uses. These standards are designed to achieve the water quality
criteria established for a given water body. These standards are designed to improve and/or
maintain the quality of the receiving water, regardless of the cost or availability of treatment
technology.
xxi

-------
Industrial User Inspection and Sampling Manual
Chapter 1. Introduction
1. INTRODUCTION
The overall objectives of the General Pretreatment Regulations are to: 1) prevent the introduction of
pollutants into publicly owned treatment works (POTWs) which will interfere with the operation of the
plant, including interference with the desired use or disposal of its municipal sludge; 2) prevent the
introduction of pollutants into the POTW which will pass through the treatment works to receiving
streams; 3) improve opportunities to reclaim and recycle municipal and industrial wastewaters and
sludges; and 4) reduce the health and environmental risk of the discharge of toxic pollutants to POTWs.
Under the General Pretreatment Regulations, POTWs with approved pretreatment programs are required
to inspect industrial users and sample industrial users' wastestreams to assess compliance status with
pretreatment program requirements and standards (40 CFR 403.8(f)(2)(v)). This manual is intended to
acquaint POTW personnel with the well-established inspection and wastewater sampling procedures that
have been used in the National Pollutant Discharge Elimination System (NPDES) program for many
years. The information presented will provide the POTW inspector1 a framework for conducting
inspections and wastewater sampling. The manual assumes that the POTW inspector has a basic
knowledge of wastewater treatment technologies, as well as all applicable federal, state and local
pretreatment requirements.
This guidance is primarily intended for use by POTW inspectors where the POTW has an approved
pretreatment program; however, the procedures outlined in this guidance may be used by local POTW
inspectors without an approved pretreatment program that need to characterize an industrial user.2
The information contained in this guidance will serve the experienced inspector as a reference, while new
inspection personnel will find it useful for learning how to conduct inspections and sampling at
significant industrial users (SIUs) and other regulated industrial users. This manual is also intended to
assist the POTW's legal counsel and laboratory personnel as a reference for the legal and technical
aspects of pretreatment inspections and sampling activities.
Certain elements of this industrial user inspection and sampling framework may not need to be
implemented by each POTW in all cases. For example, where there are just a few, very small, industrial
users in the system, the POTW may never encounter issues relating to confidential business information
(CBI) or have the need to implement some of the safety precautions described in this manual. For large
POTWs with many complex industrial users, it may be necessary for the POTW to follow each of the
procedures outlined in this manual. When a POTW identifies a new industrial user in its jurisdiction, each
of these procedures should be considered in establishing appropriate inspection and monitoring
requirements for that industrial user. For additional assistance, POTW staff can contact their U.S.
Environmental Protection Agency (EPA) or state pretreatment coordinator.
1	As used in the text and throughout this manual, the term "inspector" includes all field personnel who collect
information that may lead to or support an enforcement action.
2	For industrial user inspection and sampling activities that are conducted by state or EPA inspectors, the inspector
should follow applicable state or EPA inspector requirements and guidelines. Applicable guidelines for EPA
inspectors include the most current version of EPA Order 3500.1, Training Requirements for EPA Personnel Who
Are Authorized to Conduct Civil Compliance Inspections/Field Investigations and EPA Inspector Supervisors, and
EPA Order 3510, EPA Federal Credentials for Inspections and Enforcement of Federal Environmental Statutes and
Other Compliance Responsibilities, and the Policy Affirming the EPA Authority to Access Facilities and Conduct
Inspections without Providing Personally Identifiable Information (January 2015).
1

-------
Industrial User Inspection and Sampling Manual
Chapter 1. Introduction
1.1 Legal Authority and Regulatory Basis for Conducting Industrial User
Inspections and Sampling
The General Pretreatment Regulations are published in the Code of Federal Regulations (CFR) at 40 CFR
Part 403 and establish the requirements for implementing an approved pretreatment program. The
regulations outline the minimum requirements a POTW with an approved pretreatment program must
perform to satisfy the obligations established in its NPDES permit. With regard to inspecting and
sampling industrial users, 40 CFR 403.8(f)(l)(v) requires the POTW to have the legal authority to:
"Carry out all inspection, surveillance and monitoring procedures necessary to determine,
independent of information supplied by industrial users, compliance or noncompliance with
applicable Pretreatment Standards and Requirements by Industrial Users. Representatives of the
POTW shall be authorized to enter any premises of any Industrial User in which a Discharge
source or treatment system is located or in which records are required to be kept under 40 CFR
403.12(o) to assure compliance with Pretreatment Standards."
Federal pretreatment regulations at 40 CFR 403.8(f)(l)(vi)(B) require POTWs with approved
pretreatment programs to have the legal authority to enter industrial user facilities to carry out inspections
and monitoring activities. POTWs generally adopt this legal authority in their local sewer use ordinances
(SUOs). This gives the POTW's representatives the authority to enter, inspect, review records, gather
information (e.g., take photos, ask questions, copy records), and sample wastewater at an industrial
facility. Please note that the Federal pretreatment regulations do not specifically provide the legal
authority to take photos; EPA recommends that the local pretreatment programs specifically establish this
legal authority.
Section 403.8(f)(2)(v) of the regulations requires POTWs to:
"Randomly sample and analyze the effluent from Industrial Users and conduct surveillance
activities in order to identify, independent of information supplied by Industrial Users, occasional
and continuing noncompliance with Pretreatment Standards. Inspect and sample the effluent from
each Significant Industrial User at least once a year, except as otherwise specified below."
The statement "except as otherwise specified below" refers to reduced inspection and sampling
requirements for SIUs that meet Middle Tier Categorical Industrial Users (MTCIUs) and Nonsignificant
Categorical Industrial Users (NSCIU) criteria. Reduced inspection and sampling requirements are
discussed further in Section 2.2 of this manual.
Inspection and sampling activities form the core of the POTW's compliance monitoring program and
require POTW personnel to enter private property to gather information to assess or determine the
compliance status of the facility. These compliance monitoring activities must be performed in
accordance with minimum constitutional protections, for example, protecting against unreasonable
searches and seizures, as well as other rights and "due process" considerations available to individuals
under federal, state or local law. Consequently, all POTW representatives, including any authorized
agents of the POTW, who enter industrial facilities, should be familiar with the section of their local
ordinance that provides the inspector (or the POTW's agent) the authority to enter an industrial user's
facility to conduct an inspection and/or sample the wastewater. In addition, each inspector should be
familiar with the POTW's standard procedures for entering industrial facilities, including how to obtain a
warrant if entry is denied or withdrawn.
In some instances, the POTW may employ an independent contractor to perform all or a certain aspect of
the pretreatment program. POTW personnel should consult with state or local law to ensure that the
POTW may, in fact, designate such contracted personnel as inspectors. The POTW is responsible for
making compliance determinations and policy decisions that affect the conduct of inspections or
sampling. The POTW is also responsible for ensuring that industrial user employees and contract
employees are operating all systems in a manner that comply with the requirements of the industrial
2

-------
Industrial User Inspection and Sampling Manual
Chapter 1. Introduction
user's discharge permit.3 Furthermore, if the industrial user reports submitted to the POTW are signed by
a contract employee, the POTW must ensure that the contract employee meets the signature requirements
at 40 CFR 403.12(1).
It is important that the inspector keep current on applicable regulations. Sources of information for the
inspector include:
•	The Federal Register.
•	The Code of Federal Regulations.
•	Subscribing to a service that summarizes the EPA regulations, such as
http://listserv.access.gpo.gov.
•	Attending conferences and workshops.
•	Taking online and/or classroom training courses.
•	Consulting on a regular basis with the POTW's legal counsel, and/or EPA or state pretreatment
coordinator (as needed).
1.2 Purposes and Objectives for Inspecting and Sampling Industrial Users
Each POTW with an approved pretreatment program must implement a compliance monitoring program4
that: 1) meets the requirements and intent of the General Pretreatment Regulations, 2) is effective and
timely in determining compliance with categorical standards, local limits and discharge prohibitions,
3) provides representative data required to meet POTW reporting requirements to the state or the EPA,
and 4) provides sampling data that would be admissible in court, if an enforcement action were to be
undertaken by the POTW, state or federal government.
Specifically, the objectives of the POTW's compliance monitoring program are to:
•	Evaluate industrial user compliance
-	Verify the completeness, accuracy, and representativeness of self-monitoring data from
the industrial user as well as whether required sampling and analysis techniques were
used.
-	Verify production/flows at applicable production-based categorical industrial users
(CIUs) to validate accurate equivalent concentration permit limits.
-	Determine compliance with all applicable requirements, such as industrial user permit
conditions and SUO provisions5.
-	Evaluate best management practices (BMPs) and pollution prevention measures.
-	Evaluate the industrial user's standard operating procedures (SOPs), chemical waste
handling procedures, preventative maintenance programs, process/pretreatment
equipment and general housekeeping.
-	Determine if the industrial user has corrected problems identified in previous inspections.
3	The General Pretreatment Regulations refer to industrial user permits as well as control mechanisms. The
regulations use the two terms interchangeably and, therefore, this same practice is applied throughout this guidance
document.
4	Compliance monitoring programs include activities such as on-site inspections and sampling, as well as review
of self-monitoring reports and other information submitted by industrial users.
5	It is important to note that inspectors should never make compliance determinations while at the facility.
3

-------
Industrial User Inspection and Sampling Manual
Chapter 1. Introduction
Support past and future enforcement actions against noncompliant industrial users,
including ensuring the industrial user complies with obligations imposed through prior
enforcement actions.
-	Assess the potential for spills and slug discharges and evaluate the effectiveness of slug
discharge control measures.
-	Evaluate the adequacy of the industrial user's hazardous waste management and disposal
practices.
-	Consider potential compliance issues with other statutes or regulations (e.g.,
Occupational Safety and Health Administration (OSHA), RCRA, etc.)
•	Develop and revise industrial user permit requirements
-	Confirm applicability of appropriate categorical standards for the facility.
-	Confirm the accuracy of information in the most current permit application (or survey
form) with respect to the industrial user's operations. Specifically, assure raw materials
and chemicals used, production, treatment, and disposal practices, and all wastestreams
are accurately captured in the application (or survey form).
-	Evaluate the impacts of the industrial user on the POTW's influent, treatment processes,
sludge and effluent (including water quality impacts from the effluent).
-	Assess the adequacy of the industrial user's self-monitoring program and permit, and
support permit revisions as appropriate.
-	Confirm comprehensive process narrative and wastewater flow schematics coincide with
current operations at the industrial user (i.e., have there been any changes in either that
have not been reported?).
-	Evaluate and document pollution prevention (also known as P2) activities and
opportunities (source reduction, environmental management system (EMS), BMPs,
water/energy re-use/conservation, in-situ recycling, etc.)
-	Provide a basis for establishing the sampling requirements of the industrial user (above
the federal minimums).
-	Evaluate the adequacy of the industrial user's operation and maintenance (O&M)
activities on its pretreatment system.
•	Maintain a strong local pretreatment program
-	Evaluate the need for revised local limits.
-	Inform the regulated community of pretreatment requirements.
-	Maintain current data on each regulated industrial user.
-	Generate data that can be used by the POTW in its annual report to the Approval
Authority.
-	Establish and maintain good working relationships with the industrial user.
-	Provide a presence in the field so that industrial users understand that the POTW is
serious about its regulatory oversight duties.
Industrial user sampling and inspections are the cornerstone of the POTW's pretreatment compliance and
enforcement program. The inspector's presence helps to establish the POTW's role as a responsible
public agency observing the actions of the regulated industry. Without the inspector on the scene,
4

-------
Industrial User Inspection and Sampling Manual
Chapter 1. Introduction
industrial processes/practices that violate federal, state, or local laws could jeopardize the POTW, the
environment, and public health. The inspector may be the only person from the POTW who regularly
visits the industrial user's facility. Furthermore, the knowledge that an inspection could occur
unannounced encourages industrial plant managers to keep their operations in compliance.
1.3 Outline of the Manual
This guidance manual is designed to lead the POTW inspector through the inspection and sampling
process step-by-step. The Introduction in Chapter 1 provided the legal authority, specific regulatory
requirements, and purpose for performing inspections of industrial users under the General Pretreatment
Regulations at 40 CFR Part 403.
Chapter 2 discusses developing and maintaining an industrial user inventory, required frequencies for
inspections, types of inspections, CBI requirements, responsibilities of the inspector, and inspection
documentation. Chapter 2 also presents a chronological outline for conducting an inspection at an
industrial user, beginning with the pre-inspection activities, such as the preparation and entry
considerations. The chapter covers the on-site activities of the inspector, including pre-inspection
observations, the opening conference or initial meeting at the facility, the records review process,
observations and illustrations, and the closing conference, or exit interview. Further, Chapter 2 discusses
follow-up activities that should be conducted by the POTW (e.g., inspection report writing, enforcement
actions, data tracking) to complete the inspection. Chapter 2 concludes with an inspection checklist.
Chapter 3 presents a detailed framework for conducting sampling at the industrial user. This chapter
covers the objectives of sampling, required frequencies of sampling, pollutants to be monitored, analytical
methods, development of a Sampling and Quality Assurance Plan, quality assurance/quality control
(QA/QC) considerations, pre-sampling considerations, on-site sampling activities, flow measurement, and
compliance issues related to sampling and analysis.
Chapter 4 provides important information about safety considerations that must be followed when
conducting industrial user inspections and sampling. Health and safety of all individuals involved is of
utmost importance.
Chapter 5 provides a list of additional resources that are available to supplement this manual.
5

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
2. INSPECTING INDUSTRIAL USER FACILITIES
This chapter presents procedures that POTW personnel can use when conducting on-site inspections at
industrial facilities that discharge process wastewater to the POTW. The principal intent of this chapter is
to assist POTW personnel in planning inspections, and collecting and documenting sufficient information
to determine industrial user compliance with all applicable federal, state, and local pretreatment standards
and requirements. New POTW inspection personnel are encouraged to read and understand the material
presented in this chapter before beginning any inspection activities.
This chapter begins with a discussion of general inspection topics such as: developing and maintaining an
industrial user inventory; criteria to be used in setting the frequency of inspections and sampling
activities; the types of inspections that can be performed by the POTW; how to handle CBI; the general
responsibilities of the POTW inspector; and the documentation of observations and findings. The chapter
then details specific inspection activities. The topics covered in this discussion include pre-inspection
activities, on-site activities, and follow up activities. An inspection checklist that can be used by the
inspector as the basis for the inspection and the inspection report is included at the end of the chapter.
2.1 Developing and Maintaining an Inventory or List of Industrial Users
It is required that the POTW maintain an up-to-date listing of each industrial user that discharges to the
POTW (40 CFR 403.8(f)(2)(i)). All permitting, compliance monitoring and enforcement activities that the
POTW undertakes are derived from accurate, ongoing identification of the regulated industrial users in
the POTW's system. Once this list is established, the POTW should update this information on an
ongoing basis. In addition to continually tracking and updating lists of industrial users, the POTW is
required to report its list of SIUs as part of its annual report submittal to the state or EPA (40 CFR
403.12(i)). Sources of information for updating industrial user inventories include:
•	Applications for water or wastewater service.
•	Enforcement and Compliance History Online (ECHO), RCRA information, the Discharge
Monitoring Report Pollutant Loading Tool, the Toxics Release Inventory, as well as the state's
hazardous waste generators list.
•	Building permit and business license applications.
•	Industrial waste questionnaires.
•	Internet searches.
•	Local chamber of commerce.
•	Coordination with internal departments and local agencies such as utilities, code enforcement,
health departments, and fire departments.
•	Drive-by reconnaissance of the jurisdiction by POTW personnel.
•	Newspapers, yellow book advertising, etc.
To keep the list current, the POTW should also establish procedures for working closely with planning
and business development offices. For example, some municipalities have developed a system so that the
POTW operator is automatically notified of any new business license applications. POTWs should also
establish requirements for contributing jurisdictions to notify the POTW of any new industrial users or
develop the legal authority and procedures to identify industrial users in contributing jurisdictions. The
POTW should periodically document its industrial waste survey activities and results.
6

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
A current inventory of all industrial users is essential to the POTW's ability to ensure compliance with its
NPDES permit and provide accurate information to the NPDES permitting authority for permit
development. This list of industrial users also provides the basis for developing a plan for scheduling
inspections at industrial users.
2.2 Frequency of Inspections
The General Pretreatment Regulations require POTWs with approved pretreatment programs to develop
procedures to randomly sample and analyze the effluent from all industrial users and conduct surveillance
activities to identify, independent of information supplied by the industrial users6, occasional and
continuing noncompliance with pretreatment standards (40 CFR 403.8 (f)(2)(v)).
When considering how often to inspect an industrial user, the POTW should consider (at a minimum) the
following criteria:
•	The minimum inspection requirements established in the General Pretreatment Regulations.
•	POTW problems (such as interference or pass through) that have no known cause.
•	POTW problems known or suspected to have been caused by the industrial user.
•	The industrial user's potential to adversely affect the POTW's operations.
•	The compliance history of the industrial user.
•	The period of time since the last inspection.
•	Public tips and complaints, including communication with local departments/agencies.
•	The volume and variability of the discharge.
•	The quantity and nature of materials stored or in use at the industrial user and their relative risk
of accidental spill.
•	The type and reliability of industrial user control methods used to achieve compliance.
•	New or additional pretreatment standards and requirements that apply to the industrial user.
•	Available POTW resources for compliance monitoring activities.
•	Special considerations or circumstances such as seasonal production schedules or batch
discharges at the industrial facility.
The General Pretreatment Regulations require POTWs to inspect and sample SIUs at least once each year
(40 CFR 403.8(2)(v)). EPA established this minimum frequency of annual inspections for all SIUs,
including those with good compliance histories, to ensure that the Control Authority does not rely
exclusively on self-reported data when evaluating industrial user compliance.
For industrial users that are not permitted or controlled SIUs, the POTW should develop procedures for
routine inspections, in addition to other methods to gather information. The procedures should provide an
objective basis for scheduling inspections by establishing a system for setting priorities to ensure that
industrial users are not unfairly selected for inspection. For example, scheduling could be built around
volume of discharge or discharge of pollutants of concern for the POTW, alphabetical order of SIUs, or
geographic locations of SIUs. POTWs should also develop an inspection plan (discussed below) to
6 SIUs must report results from sampling data a minimum of two times per years. POTWs that have approved
Streamlining Regulation program modifications may allow reduced reporting for CIUs. NSCIUs may have reduced
sampling and reporting if approved by the Control Authority. MTCIUs may have their monitoring reporting reduced
by the Control Authority from a minimum of twice per year to once per year.
7

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
establish the criteria under which the POTW will conduct SIU inspections at a frequency greater than the
once per year minimum.
For example, a large SIU facility with a poor compliance history might be scheduled for monthly site
visits, some of which could be inspections without sampling. On the other hand, an SIU with a fairly
consistent record of compliance, a cooperative attitude toward the pretreatment program, and a relatively
constant manufacturing process might need to be inspected only once per year. When establishing an
inspector's site visit schedule, adequate time must be allotted to allow inspectors to prepare for each visit
and document their findings in a site visit report.
There are some exceptions to the requirement that POTWs inspect SIUs a minimum of once per year.
Where the POTW's approved program has incorporated changes, including revision of its legal authority,
into its approved pretreatment program in accordance with procedures at 40 CFR 403.18, the POTW has
the discretion to reclassify SIUs that meet certain conditions as MTCIUs (see 40 CFR 403.12(e)(3)) or as
NSCIUs.
For MTCIUs, the POTW may reduce the inspection frequency of the CIU to at least one sampling
inspection every two years (40 CFR 403.8(f)(2)(v)(C)). If the industrial user no longer meets the
conditions for classification as Middle Tier (defined in 40 CFR 403.12(e)(3)) the POTW must
immediately begin inspecting the CIU at least once a year. The Control Authority must retain
documentation to support the Control Authority's determination that a specific industrial user qualifies for
reduced reporting requirements for a period of three years after expiration of the term of the control
mechanism.
MTCIUs are defined as CIUs that discharge categorical wastewater (wastewater from a facility subject to
a categorical standard in 40 CFR Chapter I, Subchapter N, Parts 405-471) that does not exceed any of the
following:
•	0.01 percent of the design dry weather hydraulic capacity of the POTW, or 5,000 gallons per
day (gpd) whichever is smaller, as measured by a continuous effluent flow monitoring device.
•	0.01 percent of the design dry weather organic capacity of the POTW.
•	0.01 percent of the maximum allowable headworks loading for any pollutant for which
approved local limits were developed by a POTW.
Also, to be classified as an MTCIU, the industrial user must meet the following conditions:
•	The industrial user has not been in significant noncompliance (SNC), as defined in 40 CFR
403.8(f)(2)(viii), for any time in the past two years.
•	The industrial user does not have daily flow rates, production levels, or pollutant levels that
vary so significantly that decreasing the reporting requirement for this industrial user would
result in data that are not representative of conditions occurring during the reporting period.
•	The industrial user must notify the Control Authority immediately of any changes at its facility
causing it to no longer meet these conditions. Upon notification, the industrial user must
immediately begin conducting self-monitoring twice a year.
An NSCIU (defined in 40 CFR 403.3(v)(2)) never discharges more than 100 gpd of total categorical
wastewater (excluding, noncontact cooling and boiler blowdown wastewater) and meets the following
conditions:
•	Consistently complied with all applicable categorical requirements for a period of 2 years.
•	Submits annual certification statement required in 40 CFR 403.12(q).
•	Never discharges any untreated concentrated wastewater.
8

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
NSCIUs are CIUs that are no longer SIUs. As CIUs, NSCIUs are still required to comply with applicable
categorical pretreatment standards. Where the POTW has determined that a CIU meets the criteria for
classification as an NSCIU, the POTW must evaluate, at least once per year, whether the NSCIU
continues to meet the criteria above. As part of the annual evaluation, EPA recommends that the POTW
conduct an on-site inspection of the facility in order to maintain awareness of the facility's process and, to
the extent possible, to determine whether the discharger is complying with its pretreatment program
requirements. As part of the evaluation, the POTW should verify the NSCIU's certification under 40 CFR
403.12(q) and review any other documentation provided by the facility. The level of effort devoted to an
evaluation can be tailored to the facility.
Future references in this document for MTCIUs and NSCIUs are made with the assumption that the
Control Authority has incorporated these optional provisions into its approved pretreatment program.
Users of this manual must check the applicability of these optional provisions to its individual program.
2.3	Types of Inspections
Inspection activities at industrial facilities may be: 1) scheduled or routine; or 2) on-demand, usually in
response to a specific problem or emergency situation, such as a spill at the industrial user or an upset at
the POTW. The POTW may use either of these inspection types, but to satisfy the sampling and
inspection requirement established by the General Pretreatment Regulations (40 CFR 403.8(f)(2)(v)), the
POTW must annually conduct at least one complete compliance inspection at each SIU.
During scheduled/routine inspections POTW inspectors conduct surveillance activities to identify,
independent of information supplied by the industrial user, whether the industrial user is in compliance
with General Pretreatment Regulations and discharge permit requirements. These inspections are required
for approved pretreatment programs and POTWs must inspect SIUs annually, at a minimum.
Scheduled/routine inspections can be announced or unannounced (see section 2.7.4, Notification of the
Facility). Also, these types of inspections can be used to determine whether the industrial user should be
subject to the POTW's pretreatment program. This is part of an ongoing industrial user survey process
that the POTW should administer.
On-demand inspections are usually initiated in response to known or suspected violations, usually
identified as a result of reviewing a self-monitoring report, a public complaint, a violation of the POTW's
NPDES permit requirements, POTW operating difficulties, unusual influent conditions at the POTW, or
emergency situations (e.g., sewer line blockages, fires, or explosions). When emergency situations arise at
the POTW or within the collection system, the POTW should immediately initiate inspections of
industrial users that may have caused or contributed to the emergency conditions. (Note: Sampling is
almost always a part of an on-demand inspection because the purpose of the inspection is to identify or
verify the source of a known problem and to gather information that might be used in a subsequent
enforcement action.) Depending on the nature of the problem at the facility, in some instances, the POTW
may want to notify or invite other appropriate local agencies (e.g., the fire department, the state hazardous
waste response team, or the EPA). Depending on the scope of an on-demand inspection, it may not
sufficiently satisfy the regulatory requirement for annual inspection and sampling of SIUs.
2.4	Confidential Business Information (CBI)
The very nature of inspections involves gaining access to and collecting information that companies or
facilities would not ordinarily make available to the public. When conducting compliance inspections, the
inspector may have to address claims of business confidentiality. States that implement NPDES and
pretreatment programs generally have their own regulations for handling information that businesses
consider sensitive or business confidential. State and POTW pretreatment inspectors should know and
follow applicable state and local law when handling such confidential business information, and should
know what types of information are typically claimed as CBI.
9

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
The pretreatment regulations at 40 CFR 403.14 specifically distinguish what EPA must do (as described
in 40 CFR part 2, subpart B) to protect confidential business information and what states may do to gain
access to confidential business information. If a valid claim of confidentiality is made by a facility at the
time of submission, then EPA must protect this information as described in 40 CFR part 2, subpart B.
This claim of confidentiality cannot be made for information deemed by the Agency to be effluent data.
2.5 Responsibilities of the Inspector
The inspection better enables the Control Authority to determine the reliability of self-monitoring reports
and the compliance status of each industrial user which is the foundation for any subsequent enforcement
action. In order to conduct a thorough inspection and gather information to determine compliance status,
the inspector must be knowledgeable about the requirements that apply to the industrial user (i.e., the
industrial user permit, the SUO, and federal categorical standards). Local pretreatment program inspectors
are responsible for the program areas described below.
2.5.1	Legal
POTW inspectors must conduct all inspection activities within the legal framework established under
federal, state and local law. The inspector must be knowledgeable of the conditions established in the
industrial user permit, the local SUO and local limits, applicable national categorical standards, best
management practices, and any other applicable state or local regulations, including any special
requirements regarding entry to the industrial user.
2.5.2	Procedural
POTW inspectors must be familiar with general inspection procedures and evidence collection
techniques, such as those described in this manual, to ensure complete inspections and to avoid
endangering potential legal proceedings on procedural grounds. These inspection procedures should be
set forth in local policies (e.g., the POTW's Enforcement Response Plan (ERP)) and should include
procedures for all aspects of a sampling inspection, including sampling, flow monitoring, and
documenting the results of these activities in a manner that enables the POTW to produce evidence that is
admissible in a judicial action. The standard sequence of activities for conducting inspections is outlined
in detail in Table 2-1. These procedural considerations are also discussed later in this chapter.
10

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Table 2-1
Procedural Responsibilities of the POTW Inspector
Pre-lnspection Preparation:
•	Establish the purpose and scope of the inspection.
•	In certain situations, consider sending previous inspection report to industrial user representative to make any
updates which have not been previously reported. Request a revised version to be returned prior to inspection.
•	Review all pertinent background information, including the industrial user's permit, the permittee's compliance
file, the industrial user's permit application (or survey form) any wastewater characterization done previously,
sample results both from POTW and industrial user sampling, and applicable categorical standards.
•	Review any compliance reports and self-monitoring reports required by the permit.
•	Review reports of any previous inspections conducted at the facility.
•	Contact appropriate industrial user personnel responsible for the permittee.
•	Develop a plan for the inspection.
•	Prepare any documents and equipment necessary for the inspection.
•	Coordinate scheduling with the laboratory if samples will be collected.
•	Contact responsible party for transporting samples and for packing/shipping/preservation requirements.
•	Prepare site specific Job Hazard Analysis Safety Protocols.
•	Obtain appropriate safety clothing or equipment (e.g., hard hat, protective steel-toed boots, safety glasses, ear
plugs).
•	If the facility has a laboratory on site, review laboratory records for QA/QC and monitoring data (e.g., flow, pH).
•	If the facility has a laboratory on site, review laboratory procedures to verify the use of approved methods.
Entry:
•	Present official credentials and clearly identify yourself and any other members of the inspection team.
•	Do not sign any enforcement waivers or documents forbidding evidence collection.
•	Manage denial or withdrawal of entry, if necessary.
Opening Conference or Meeting:
•	Discuss inspection objectives and scope.
•	Based on level of experience of industrial user contact (new or old contact?), give overview of the POTW's
expectations for the industrial user.
•	Establish a working relationship with the industrial user. Review industrial user records (e.g. including self-
monitoring, treatment system O&M records, hazardous waste manifests, and other records of offsite disposal)
and industrial user's wastewater permit.
•	Discuss spill prevention and response actions industrial user must take if there is a spill.
•	Discuss authority to gather information, including taking photos.
•	Gather information regarding the industrial user and confirm the accuracy of the information the industrial user
has provided on the most current permit application or survey forms:
Chemical supply, storage, transfer, handling.
Raw materials, feedstocks used.
Industrial process use or service provided.
Wastestream generation and management methods (recycling/reuse, treatment, haul offsite, etc.).
Discharge of wastestreams.
Facility Inspection (operations walk-through):
•	Conduct visual inspection of the entire industrial facility.
•	Review wastewater pretreatment equipment and overall system.
•	Inspect monitoring equipment, treatment process(es), and operations.
•	Review hazardous waste records.
•	Collect samples.
•	Document inspection activities (e.g., take notes and photos, complete inspection checklist).
11

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Closing Conference:
•	Obtain missing or additional information.
•	Identify inspection goals that were not achieved (e.g. if you needed to see something that was not possible that
day.)
•	Clarify questions and answers with facility officials.
•	Review preliminary inspection findings and inform facility officials of follow-up procedures.
•	Never make compliance determinations in the field.
Inspection Report:
•	Organize inspection findings into a useful, objective evidence package.
•	Include all identified deficiencies and required activities.
•	Prepare the narrative report, checklists, and documentary information, including photos and sampling results.
•	Review any findings of noncompliance with POTW enforcement personnel, supervisor, and enforcement
attorney, when necessary.
•	Enter findings into tracking database, as appropriate.
Send the industrial user a copy of the results of the inspection in a timely manner.
2.5.3 Evidence Collection
POTW inspectors must be familiar with general evidence gathering techniques because the POTW's case
in a civil or criminal prosecution depends in part on the evidence gathered during the inspection.
Inspectors must keep detailed records of each inspection. Information gathered during the on-site
inspection will be used to develop the inspection report, determine the appropriate enforcement response,
and support testimony in an enforcement action. In particular, inspectors must know how to:
•	Substantiate facts with items of evidence, including: samples, photographs, document copies,
statements from witnesses, and objective observations.
•	Collect and preserve data in a manner admissible in legal proceedings, including chain-of-
custody procedures.
•	Testify in court and administrative hearings.
The standard to which POTWs are held for purposes of evidence collection during an inspection or
sampling event is further outlined in 40 CFR 403.8(f)(2)(vii):
"Sample taking and analysis, and the collection of other information shall be performed with
sufficient care to produce evidence which is admissible in enforcement proceedings or judicial
actions."
Specifically, this statement means that:
•	POTWs must use proper sampling techniques to ensure that the sample is representative of the
discharge.
•	Inspections must be documented appropriately to be admissible evidence. For example, photos,
inspection notes, and reports must be specific, clear, and objective documentation of the
inspector's observations.
•	Sampling and analysis procedures comply with 40 CFR part 136 (or are approved by the EPA)
for pollutants covered by 40 CFR part 136.
12

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
•	The sampler preserves evidence that the samples have not been tampered with or compromised
(e.g., chain-of-custody protocol has been followed and access to a composite sampler during
sampling events has been controlled).
•	Chain-of-custody has to be complete from sampling personnel to receiving lab. All appropriate
"relinquished by" and "received by" boxes have to be signed (preferably printed name and
signature).
•	A QA/QC program is in place and has been adhered to.
2.5.4	Safety
The POTW inspector must follow safety procedures set out by their respective municipal governments
and state inspectors must follow their state safety procedures, including: wear appropriate personal
protective equipment (PPE) (e.g., steel or composite-toed shoes, hard hat, and safety glasses), maintain
safety equipment in good working order, and use safety equipment in accordance with any manufacturer
specifications or label procedures. In addition, the POTW inspector should develop a Job Hazard Analysis
and a safety plan with consideration of the industrial users that would be inspected, and follow the safety
procedures established by the industrial user that is being inspected. For more information on OSHA job
hazard analysis requirements see https://www.osha.gov/Publications/osha3 071 .pdf. The expectation for
the POTW inspector is that since the industrial user inspection universe contains such a mix of varied
industries they should review any hazard communication documents related to the industrial user, such as
SDSs (formerly MSDSs), when arriving onsite to assure that the inspector is prepared for the hazards that
he/she may encounter.7
2.5.5	Professional/Ethical
POTW inspectors must perform their duties with the highest degree of professionalism. In dealing with
industry representatives, inspectors must be tactful, courteous, and diplomatic. The inspector is the
representative of the POTW, and is often the primary POTW point of contact for the industrial user. A
firm but responsive attitude should encourage cooperation and support a good working relationship with
the facility. The inspector must not use threatening language. Inspectors should avoid any negative
comments regarding any product, manufacturer, or person while conducting the inspection. Inspectors
should not accept gifts, favors, lunches, or any other benefits under any circumstances.
2.5.6	Quality Assurance (QA) Responsibilities
The inspector must assume the primary responsibility for ensuring the quality of the compliance data
obtained during the inspection. While other organizational elements play an important role in QA, it is the
inspector who must ensure that all effluent data collected as part of the sampling inspection and
introduced into the inspection file are complete, accurate, and representative of current conditions at the
industrial user. To help the inspector meet these responsibilities, the POTW should develop a Sampling
and Quality Assurance Plan (described more fully in Section 3.4) that identifies individual responsibilities
and detailed procedures for ensuring the highest quality of sampling.
The objective of the plan is to establish standards that will guarantee that data obtained during the
inspection or sampling event meet the requirements of all anticipated users of that data. The Sampling and
Quality Assurance Plan must be able to be used by compliance personnel to determine the compliance
status of the facility, and it must be able to be used by the POTW in court as admissible evidence in an
enforcement proceeding. Many elements of QA are incorporated directly into the basic inspection
7 Note that EPA inspectors must follow established EPA health and safety procedures, along with any
appropriate additional procedures established by the Industrial User, as long as the additional procedures do not
conflict with EPA SOPs and guidance or present any risk to the inspector.
13

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
procedures and may not be typically identified as QA techniques by the inspector (e.g., chain-of-custody
procedures). The inspector must be aware that following established inspection procedures is critical to
the inspection program. These procedures should be developed to reflect the following QA elements:
•	Valid data collection.
•	Approved analytical methods.
•	Standard data handling and reporting.
•	Quality analytical techniques.
2.5.7 Knowledge and Skills
The federal pretreatment regulations in 40 CFR 403.8(f)(3) require a POTW to have sufficient resources
and qualified personnel to carry out the authority and procedures of the pretreatment program, including
inspections of industrial users. When conducting a comprehensive inspection at an industrial user, POTW
personnel are required to evaluate a broad spectrum of activities at the facility. In some cases, the level of
expertise for this evaluation may exceed the qualifications of some inspectors, for example, when
evaluating whether the industrial user employs appropriate analytical equipment or procedures. For every
inspection, the POTW should make available appropriately trained and skilled POTW or contractor staff,
such as analytical chemists, either to assist in the inspection directly or to train other inspectors. The
general skills and knowledge that POTW inspectors should have are outlined in Table 2-2.
Table 2-2
Knowledge and Skills Required of Pretreatment Inspectors
Pretreatment inspectors must have knowledge of the following:
•	Federal, state and local regulations and requirements, including federal categorical pretreatment standards and
local limits.
•	Any applicable industrial user permit requirements.
•	Toxic constituents and conventional pollutants in industrial waste discharges.
•	Industrial processes and where wastestreams are generated.
•	Spill control procedures.
•	Industrial and municipal wastewater treatment technology.
•	Wastewater sampling methods.
•	Wastewater analytical methods.
•	Flow measuring techniques.
•	The POTW and how it operates.
Pretreatment inspectors should have the ability to:
•	Inspect waste treatment facilities.
•	Assess representativeness and quality of data and information.
•	Assess impacts to the POTW (collection system, treatment processes, POTW worker safety, biosolids, etc.)
from various types of pollutants in industrial effluent.
•	Identify safety hazards associated with pretreatment control.
•	Evaluate and select monitoring locations.
•	Read and interpret mechanical construction drawings and pipeline schematics.
•	Practice professional ethics.
•	Deal tactfully and effectively with industry representatives.
•	Understand other viewpoints and work with industries and other regulatory agencies.
•	Maintain accurate records and write clear and concise reports.
•	Prepare and maintain proper files and documentation on work performed.
•	Keep confidential information and trade secrets.
•	Understand and carry out procedures for confidential business information developed by the POTW.
14

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
2.6	Inspector's Field Documentation
Documentation maintained by the inspector (hard copy and electronic) may be used as evidence in a court
of law. Providing strong documentary support of discrepancies uncovered in an inspection (e.g.,
conditions at the plant are found to be different than described in the permit application) is one of the
inspector's basic responsibilities. During the on-site portion of an industrial user inspection, the inspector
takes notes and/or completes a checklist (hard copy or electronic) to provide documentation of all
inspection activities. It is important for the documentation to accurately reflect the conditions observed by
the inspector at the facility. The language used in recording the inspection information should be
objective, factual, and free of personal feelings. The inspector's notes should not contain opinions or any
observations not supportable from the facts of the inspection. The inspector can use his or her own format
to ensure all pertinent information and observations are documented. These different formats include field
notebooks, an inspection form developed by the POTW, or the checklist provided in this manual.
Information should be recorded in permanent ink for hard copy documentation. If modifications to the
notes are made, the inspector should initial and date the modifications. It is important that the notes taken
during the inspection be legible and retained on file, because the information might be used in an
enforcement action years later.
Since an inspector may be called to testify in an enforcement proceeding, it is imperative that each
inspector keep detailed records of inspections, investigations, samples collected, and related inspection
information. Field notes and checklists can become an important part of the evidence package used by the
POTW in an enforcement action and can be entered in court as evidence if properly maintained. It is also
important for the inspector to document dates and times. The POTW's legal counsel should be consulted
for advice on preparing notes so that they may be introduced as evidence in an enforcement proceeding.
2.7	Pre-lnspection A ctivities
Pre-inspection activities are crucial for conducting efficient and effective inspections because they
provide a focus for the on-site inspection activities. By carefully planning the inspection, the inspector
will not waste time on-site deciding what needs to be accomplished and how to obtain all of the necessary
information. This background work should be completed at the POTW so that inspectors can use their
time efficiently when they arrive at the facility.
During inspection planning, the inspector identifies all activities relating to the inspection, from its
objective through its execution and follow-up. An inspection plan will explain "why" the facility is being
inspected, "what" should be looked for, "how" it will be found, and "where" the inspector should focus
attention. This preparation will ensure that the inspector gathers appropriate information for the
subsequent compliance determination or enforcement purposes. By the time the inspector goes into the
field, he or she should:
•	Have a clear idea of the objective for the inspection (e.g., investigation of a reported spill or
complaint, routine compliance inspection). The objective will define the scope of the inspection
(i.e., the range of activities to be conducted during the inspection). The objective will depend
on what type of inspection is being conducted (i.e., scheduled/routine or on-demand).
•	Know all applicable program regulations (federal, state, and local), compliance history, and
physical layout of the site to help define the scope of activities the inspector will undertake at
the facility.
•	Know the SOPs for how an inspection should be conducted (e.g., the type of inspection
activities to be conducted, familiarity with the inspection tool/checklist to be used, who should
be interviewed).
15

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
•	Know sampling and QA/QC protocol. It is recommended that all Control Authorities develop a
Sampling and Quality Assurance Plan (discussed in Section 3.4).
•	Know the safety plan for protecting all members of the inspection team from potential hazards
or harmful exposures on site.
Pre-inspection preparation can be broken down into the following activities: reviewing facility
background information; developing an inspection plan; safety and sampling equipment preparation; and
notifying the facility (if appropriate). Each of these are discussed in turn below.
2.7.1 Review of Facility Background Information
To plan effectively and ensure the overall success of an inspection, it is essential that the inspector collect
and analyze any available background information on the candidate facility. By reviewing background
information, the inspector can minimize the inconvenience to the industrial user caused by requesting
information that has already been submitted. Avoiding this situation increases the regulatory credibility of
the POTW. The inspector must determine the amount of background information necessary for the
inspection and in collecting this information should focus on the characteristics that are unique to the
targeted facility (e.g., design and physical layout, historical practices and compliance status, legal
requirements). The types of information that might be important for the inspector to review are listed in
Table 2-3. A summary of this information may be kept in a separate file or filed with the final inspection
report for each industrial user so that it is conveniently available for any subsequent inspection. Some
POTWs compile this information as a fact sheet that accompanies the industrial user's wastewater
discharge permit.
Table 2-3
Information to Review Prior to the Inspection
General Facility Information:
•	Maps and schematics: showing the facility location, wastewater discharge pipes (i.e., flow schematic), sample
points, and geographic features (e.g., topography).
•	General layout of the facility.
•	Names, titles, and telephone numbers of responsible facility officials.
•	Any special entry requirements (e.g., safety equipment [protective-toed shoes, hard hats, etc.]).
•	Nature of the industrial user processing operations and wastewater characteristics, wastewater treatment systems
employed, their capacity, and chemicals used in treatment.
•	Production levels - past and present (especially for facilities regulated by production based categorical standards,
e.g., aluminum forming).
•	Changes in facility conditions since the last inspection or permit application (e.g., expansion of the facility).
•	Water use data.
•	SIU slug control plan.
•	Raw materials and chemicals used in production processes.
•	Hazardous and solid wastes produced during production.
•	Location of storage sites for raw materials, process chemicals, and stored hazardous wastes.
•	Special permit conditions (e.g., peak flow restrictions, regulation of unusual substances).
•	Progress toward meeting any applicable compliance schedule.
•	Sources, volumes, and characteristics of the waste discharges.
•	Photographs (if available).
16

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Requirements, Regulations, and Limitations:
•
Copies of all applicable federal, state and local regulations and requirements, including any joint agreements or

multi-jurisdictional agreements.
•
Copy of the industrial user's permit and permit application.
•
Any applicable compliance schedule that the facility might be under.
Facility Compliance and Enforcement History:
•
Previous inspection report(s) (determine if there were any previously identified problems that needed to be

addressed by the industrial user).
•
Any correspondence between the facility and local, state or federal agencies.
•
Documentation on past violations of permit requirements or compliance schedules (available from the POTW's data

tracking system).
•
Self-monitoring data and reports (periodic compliance reports, 24-hour noncompliance notifications, 30-day

resampling submittals, other reports).
•
Past notices of violation (NOV), formal enforcement, or other enforcement correspondence between the facility and

the POTW.
•
The capability of the industrial user's laboratory to adequately conduct various analytical methods, (if relevant

information is available)
Wastewater Treatment Systems:
•
Comprehensive description of the wastewater treatment process employed at the industrial user.
•
Process description, specifications, and schematic diagram (including treatment chemicals used, whether there is

an O&M manual, and whether it addresses staffing levels and operational records).
•
Available bypasses for existing pretreatment systems (if applicable).
•
Type and amount of wastes discharged.
•
Slug discharge control plans.
•
Spill control and contingency plans.
The inspector can find the majority of the information described in Table 2-3 in the permit application
and permit for the industrial facility,8 the POTW's industrial waste inventory, the industrial user's
baseline monitoring report (BMR), 90-Day Compliance Reports, Periodic Compliance Reports, and
information acquired by inspectors from previous visits at the facility.
It is imperative that the inspector review and understand all industrial permit requirements. The industrial
user permit should clearly identify all of the responsibilities and obligations of the industrial user in a
single document. The permit should provide information on all applicable effluent limitations (federal
categorical standards, prohibited discharge standards, and local limits); requirements and restrictions
applicable to all discharges from the facility; slug control plans; monitoring, record keeping and reporting
requirements; sampling location; type of samples to be taken; and required analytical methods (i.e.,
methods approved in 40 CFR part 136). The permit application and BMR should outline the general
facility information by describing the facility and providing site plans and layouts of the process areas and
other areas of concern. The application should also include all contact persons as well as production
levels and flow data from the facility. The previous inspection report for the facility will identify areas of
concern from the last inspection which required action on the part of the industrial user. The inspector
should review this report carefully and follow up on progress in addressing any problems previously
identified.
In general, the information in the list below should be summarized prior to the inspection. Some sections
of the checklist provided at the end of this chapter, or any other checklist the inspector has developed, can
8 For a review of permit requirements and application information, refer to the Industrial User Permitting
Guidance Manual September. 2012 available at http://www.epa.gov/npdes/pubs/pretreatment iu permitmanual.pdf.
17

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
be filled out in advance of the inspection. During the inspection, this information can be verified and
updated as needed.
•	Identifying Information: Facility name, site address, mailing address, contact name, title, and
telephone number.
•	General Background Information: Applicable categorical standards and local limits, applicable
North American Industry Classification System (NAICS) code(s), number of shifts, number of
employees per shift, hours of operation, date facility commenced discharge to the sewer, date
the categorical process commenced operation, etc.
•	Comprehensive Water and Wastewater Flow Schematics: The schematic for water flow through
the facility and the location of all wastewater discharge lines that flow to the POTW's system,
along with major plant features.
•	Comprehensive Discharge Schematic: A description of each discharge (including any batch
discharges and wastewater that is hauled off-site), volume of discharge, regulated pollutants,
frequency, and destination.
•	Comprehensive Process Description: A description of each process flow from each major
product line and process used within the plant, particularly processes that are subject to federal
categorical standards. Reactors, plating tanks and all types of process tanks can contain
chemicals that may be discharged periodically. Metal cleaning solutions are a prime example.
List the amounts of each chemical not by brand name but chemical identity in accordance with
the International Union of Pure and Applied Chemistry (IUPAC) or the Chemical Abstracts
Service (CAS), or other technical name and list the frequency of the discharge. In addition, it is
important to note how these wastes are disposed, for example, discharged to the POTW or
packed in drums as hazardous waste. If pretreatment of these solutions is practiced (e.g.,
neutralization, etc.), this fact should be noted as well as the method used to determine that the
waste has been treated to acceptable levels. General plant washdown (its frequency and
quantity of water used) is also important. In many plants, the washdown is the largest and/or the
most significant discharge.
•	Pretreatment Systems: A comprehensive narrative description and comprehensive wastewater
flow diagrams of each existing pretreatment facility, including operating data, if available.
•	List of Pollutants: The list should be divided into two categories: 1) pollutants that come into
direct contact with the water that is discharged to the POTW; and 2) pollutants that do not come
into direct contact with water discharged to the POTW, but which have the potential to enter
the wastewater due to spills, machinery malfunctions, etc.
•	Sampling Locations: A list of all sampling locations used at the facility.
•	Chemical Storage: The proximity of chemical storage to floor drains and whether floor drains
discharge to storm or sanitary sewers. The volume of all hazardous chemicals encountered
should be listed. Any floor drains should be noted. If the chemicals stored are unknown, note
the brand name, use and chemical supplier and obtain all SDSs for all chemicals used at the
plant. The supplier's address should be noted in case it is necessary to contact them to obtain
the necessary chemical information.
•	Slug Control Plans: A description of all spill control practices used by the industrial user,
including information on all past spills, unusual discharges, or temporary problems with any of
the process units that may affect the wastewater discharged to the POTW.
•	Air Pollution Control Equipment. A description of all air pollution control equipment that may
generate a wastestream, the pollutants that are likely to be found in this wastestream, and the
18

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
discharge or disposal method used. In some industries, the effluent from air scrubbing may be
the principal waste source and may contain a wide variety of process chemicals that are not
encountered in any other wastestreams.
•	Sludge Disposal. A description of how waste residuals (sludge) from the pretreatment
operations are handled, stored, and/or disposed. Many industrial processes such as cleaning,
degreasing, grinding, or chemical pretreatment produce sludge that must be disposed. How this
occurs, how often, and the quantities involved are all important. For example, vapor degreasers
are used for cleaning metal in a wide variety of industrial applications. They almost always
produce a sludge and solvent waste, and are usually water cooled, producing a steady stream of
uncontaminated cooling water. The presence of these devices should always be noted as well as
appropriate answers to questions concerning the wastes associated with them. As is the case
with batch discharges, any waste disposal service should be recorded. Sludge production is a
function of the reagent used for precipitation. It is important to know the reagent and the amount
used. A mass balance can be done using the reagent consumed and the plating bath concentration,
if the drag out rate is known. Therefore, it is important to also know the drag out rate.
•	Boiler Blowdown: A description of the biocide(s) and/or descaling chemicals used in the boiler
maintenance program. The chemicals used in this process may be chemicals of concern,
especially for sludge disposal by the POTW (e.g., molybdenum compounds).
•	Cooling Tower Blowdown: A description of any biocide/descaling/corrosion control chemicals
(not trade names) as above. Identify the frequency of blowdown, volume and frequency of
discharge from blowdown.
•	Facility Clean-Up Days or Shifts: A description of any chemicals (not trade names) used during
the facility's clean-up procedures; how frequent and whether these "clean-up" procedures are
scheduled or as necessary. This wastewater could be toxic and a potential slug load. Sampling
should also be conducted during these events).
•	Operational Problems: A description of any operational problems or shut-downs of
pretreatment facilities since the previous inspection.
•	Industrial User Water Bills: The inspector should be familiar with trends in the industrial user's
water consumption and wastewater production. This information can be obtained by a careful
review of the facility's water bills. A mass balance approach should be taken to pinpoint any
areas of water loss or potential bypass. It should be noted that some large facilities have their
own water wells and these facilities may not have water bills. The inspector should request
water pumping and consumption records from facilities with their own wells.
•	Groundwater Volume: In assessing industrial user water consumption trends, volumes of any
well water used in the facility's processes should be known in the case of production based
CIUs or for use in the combined wastestream formula (CWF).
•	Compliance Information: The inspector should review all previous industrial user compliance
sampling data, as well as all data obtained by the POTW on the facility to be inspected.
•	RCRA Hazardous Wastes: A description of all hazardous waste generated or stored at the site
and the manner of disposal for all such waste, especially any disposal to the sewer.
Each of these areas of a complete compliance evaluation is covered in the sample checklist at the end of
the chapter. This checklist may provide the basis of the information collected during the inspection,
unless the scope of the inspection does not require a complete compliance evaluation; for example, a
response to an emergency situation may require only very specific information and not the general
information contained in the checklist.
19

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
When the facility to be inspected is a categorical industry, the inspector should review any appropriate
guidance from the EPA regarding that particular category to become familiar with the specific industrial
processes to be inspected (see EPA Inspector Notebooks at
http://www.waterboards.ca.gov/rwqcb7/water issues/programs/pretreatment/docs/addtlresc toc/f sector
notebooks information .pdf). A list of all pretreatment-related guidance documents for specific industries
is found in Chapter 5 of this manual. In addition, the inspector should become familiar with the EPA
issued guidance documents associated with each industrial category in order to become more acquainted
with how each category must comply with national pretreatment requirements (see
http://clpub.epa.gov/npdes/docs.cfm7program id=3&view=allprog&sort=name'). General industrial user
inspection questions, and questions that apply to specific industrial facility types, are found in Appendices
A and B. These are helpful for the inspector to review beforehand and can be incorporated into the
inspection checklist provided at the end of this chapter.
2.7.2 Standard Operating Procedures for Inspections
POTWs should develop and implement SOPs for conducting inspections. SOPs promote consistency and
the preparation of a high-quality, well documented inspection reports. The SOP should be flexible enough
to adapt to unanticipated situations encountered at the site, but should also be designed as an organized
approach to guide the conduct of the inspection. The basic purpose of the SOP is to provide the inspector
or inspection team with a step-by-step guide to collecting relevant evidence about a facility's procedures
and practices that are to be observed during the inspection. All inspection activities (i.e., its scope) are
derived from the inspection's objective(s) (i.e., why the inspection is taking place). The objective(s), in
turn, depend on the reason for conducting the inspection (i.e., to conduct a routine compliance evaluation,
to follow up on information from a previous inspection, to investigate a complaint, or in response to an
emergency situation). The SOP should clarify each of these areas (the inspection's objective, scope and
activities) for each type of inspection. The basic components of the SOP should cover the following areas:
•	Objectives. A brief statement of the purpose of (or reason for) each type of inspection and the
inspection objectives (i.e., the goal(s)).
•	Tasks. The scope of the inspection (i.e., what range of activities need to take place to fulfill the
objectives of the visit, including areas of the facility to be inspected, the type of evidence to be
collected and documented, and number, type and volume of samples to be collected). (NOTE:
This may change in the field, since some of the evidence may be unanticipated by the inspector.
The inspector must be flexible enough to adapt to unanticipated situations in the field).
•	Procedures. The specific procedures that will be used to conduct each of the tasks, such as field
and analytical techniques, personnel interviews, and sampling protocols.
•	Resources. Resource requirements, including personnel, based upon the planned activities, and
whether a safety plan is needed. Where appropriate, this would include delineation of
responsibilities among team members.
•	Schedule. Estimation of the time required to conduct the on-site inspection based on the tasks,
procedures and resources outlined in the plan and the time required to complete the inspection
report, and the timeliness goals for providing inspection feedback to the industrial user.
The investment of time required to produce the SOP is worth the effort because it should save time and
resources during and after on-site inspections. The inspector must be clear on what questions are
appropriate to address during the inspection, and the SOP provides a framework for working through
these issues prior to visiting the site. The SOP should contain inspection checklists. The checklist at the
end of the chapter can be used for this purpose. The general components of an SOP are outlined in
Table 2-4.
20

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Table 2-4
Generic Elements of Standard Operating Procedures for Conducting Inspections
•	Objectives (Purpose)
What is the purpose of the inspection?
•	Tasks (Scope)
What coordination with laboratories, attorneys, or other programs are required?
What records, files, permits, or regulations will be checked?
What information must be collected?
Will sampling and analysis be conducted?
•	Procedures
What specific facility processes will be inspected?
What procedures will be used?
Will the inspection require special procedures?
Has a QA/QC plan been developed and understood?
What are the responsibilities of each member of the team (if applicable)?
•	Resources
Has a safety plan been developed and understood?
What personnel will be required?
What equipment will be needed (e.g., PPE, sampling, etc.)?
Is there a contract in place with an external laboratory for the analysis of any samples not analyzed by the
POTW?
•	Schedule
What will be the time requirements and order of inspection activities?
2.7.3 Safety and Inspection/Sampling Equipment Preparation
After the background information for an industrial user has been gathered and reviewed, and a plan for
the inspection has been developed, POTW personnel should review and check the types of equipment that
are necessary to meet the objectives of the site visit. An inspector must carry enough equipment to gather
the necessary information during the inspection. This part of the pre-inspection process involves obtaining
and preparing the equipment necessary for the inspection. The necessary types of equipment may vary
with the type of industrial user and the types of activities to be performed by the POTW during the
inspection. For example, if confined-space sampling is to be performed during the inspection additional
safety equipment would need to be prepared.9
All equipment must be checked, calibrated and tested prior to each inspection. The inspector must also
ensure that all materials necessary for the inspection are taken to the inspection site. Safety procedures
and equipment for a facility will be based on past experience at the facility. For new facilities it is
recommended that the POTW telephone or email the facility requesting safety information prior to
scheduling the inspection. Safety requirements and equipment must be met to ensure the inspector's
safety and to help ensure that the inspector is not denied entry to the facility or parts of the manufacturing
operations. Additional information on ensuring worker safety during inspections and sampling is
discussed in Chapter 4.
No single list of documents and equipment will be appropriate for every inspection. The majority of the
inspections that the POTW undertakes will be routine annual inspections required by the federal
pretreatment regulations. There may be instances, however, such as emergencies (e.g., spills at an
industrial user), or complaints of problems, which might require an immediate site visit to assess
compliance or ascertain the situation at the industrial user. The POTW must be ready to respond to such
situations by having all inspection equipment and documents available and ready to go. At a minimum,
9 Confined spaces can be very hazardous. Only trained and qualified personnel should enter confined spaces.
21

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
the inspector should bring a copy of the industrial user permit to the field to ensure permit requirements
are being met. Inspectors can also bring a copy of the permit application to the field, so that the industrial
user can review the information and update the inspector on anything that may have changed.
The equipment list in Table 2-5 is intended to guide and aid the inspector in planning for necessary
inspection supplies and activities.
Table 2-5
Inspection and Sampling Suggested Equipment/Supplies
General Equipment/Supplies:

• Proper personal identification or inspector
• Polyethylene bags
credential
• Disposable towels or rags
• Camera with backup battery
• Flashlight and batteries
• Pocket calculator
• Pocket knife
• Tape measure
• Cell phone
• Clipboard

• Field logbook/ or electronic tablet

• Waterproof pens, pencils, and markers

Sampling Equipment/Supplies:

• Siphoning equipment
• Container/trash bag for contaminated material
• Automatic sampler
• Waterproof container labels
• Sample bottles/containers (certified clean bottles
• Field test kits
with Teflon lids)
• Tubing, tape and rope
• Ice chest with ice
• Manhole hanging device for automatic sampler (if
• Flow meter (if applicable)
manhole sampling will be conducted)
• Preservatives

• pH equipment

• Thermometer

• Evidence tape

Documents and Forms:

• Entry warrant (if applicable)
• Chain-of-Custody (COC) Forms
• Notice of inspection (if applicable)
• Hazardous sample shipping labels
• Copy of industrial user's permit
• Inspection form/checklist
• Copy of slug control plan and any other applicable
• Copy of the local sewer use ordinance (SUO)
plans

• List of facility contacts

• Safety Plan

22

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Safety Equipment:

Inspection

• Safety glasses or goggles
• Confined space permit (if applicable)
• Face shield
• Safety harness, tripod and hard hat
• Ear plugs
• Self-contained breathing apparatus
• Rubber-soled, protective-toed, non-skid shoes
• Respirators and cartridges
• Gloves appropriate for potential pollutants
• Particulate masks
• Long sleeved Coveralls
• Safety ladder (aluminum, chain, or rope)
• Plastic shoe covers
• Safety cones
• Manhole hook or pick
• Warning flags
Sampling

• Oxygen/combustion/hkS meter with alarm

• Explosimeter (atmospheric testing device)

• Air blower with 15-foot hose

Emergency Equipment:

• Substance-specific first aid information (e.g., Safety
• Two-way communication radio or cell phone
Data Sheets)
• Fire extinguisher
• Emergency telephone numbers
• Soap, waterless hand cleaner, and towels
• First aid kit with eyewash
• Supply of clean water for washing
2.1 A Notification of the Facility
The inspector can decide whether to notify the facility prior to the scheduled inspection or whether to
conduct the inspection unannounced. Announced inspections can ensure that the appropriate facility staff
are available. During unannounced inspections the inspector may have the opportunity to observe things
that the facility has not had the chance to clean up or hide (e.g., improperly stored chemicals, inadequate
treatment), and to observe the facility operating under normal conditions. When determining compliance
with pretreatment standards during both announced and unannounced inspections, the inspector must
ensure that the industrial user is operating under normal circumstances at the time of the on-site
inspection in order to ensure any samples taken will be representative.
When the POTW chooses to conduct an announced inspection, the POTW has the discretion to decide the
appropriate timing for notifying the industrial user. Notification of the industrial user prior to visiting the
facility is used primarily before inspecting an industrial user for the first time, so that plant officials are
prepared to conduct a tour of the facility to familiarize the POTW personnel with the industrial user's
operations. If coordination with the industrial user is necessary for the inspection, for example, to ensure
that appropriate plant personnel are present, then the POTW may notify the facility of the exact date of
the inspection and request that certain industrial user personnel be present.
Prior notification should not be given to the facility when illegal discharges or improper records are
suspected, or the POTW anticipates that they will not get an accurate picture of "normal" operations. The
concern that physical conditions may be altered before the inspection or that records may be destroyed or
altered justifies an unannounced visit to the facility. Likewise, an on-demand inspection (e.g., an
inspection conducted as a result of a spill at the industrial user or upset at the POTW) cannot typically be
planned in advance. The POTW must be ready to conduct these types of inspections on very short notice
and at any time of the day or night.
23

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
2.8 Entry to the Industrial Facility
The POTW's ability to conduct an inspection at a regulated facility stems from its authority to enter the
industrial user's premises. Proper, lawful entry onto an inspection site is crucial. Failure to adhere to the
requirements for exercising the POTW's entry authority could jeopardize any enforcement actions, and
may subject the inspector to liability. Any evidence that may have been collected from an inspection
where proper entry was not followed could be ruled inadmissible in an enforcement proceeding because it
was obtained unlawfully.
This section discusses the legal basis for entry onto an industrial user's premises. It is always preferable to
enter an industrial user's facility with the consent of the plant personnel, but there may be circumstances
where such consent is not granted, or consent to enter particular areas of a facility may be denied. In
situations where consent is denied, or where consent is withdrawn part way through an inspection, it will
be necessary to follow certain procedures to ensure the legality of the inspection. This section covers both
of these situations and explains what procedures should be followed by the inspector when consent is not
granted to conduct or continue the inspection.
2.8.1 Legal Basis for Entry
Federal pretreatment regulations at 40 CFR 403.8(f)(l)(vi)(B) require POTWs with approved
pretreatment programs to have the legal authority to enter industrial users to carry out inspections and
monitoring activities. POTWs generally adopt this legal authority in their local SUOs. This gives the
POTW's representatives the authority to enter, inspect, review/copy records, and sample at an industrial
facility. The POTW inspector is usually required to present proper credentials prior to entering the
facility. An inspector's credentials are his or her proof of authority to enter and inspect a facility, and
should always be presented when entering the facility.
There may be times when an inspector wishes to inspect a facility that assumes it is a non-discharging
facility, for example, if the POTW suspects that the non-discharging facility has commenced a discharge
without a permit, or if the POTW desires to verify that no discharge is occurring at the facility. Under
these circumstances, the same authority that allows the POTW to enter the premises of discharging
facilities should enable the POTW to gain access to the potentially non-discharging facility. Of course, if
the facility refuses entry, for whatever reason, the POTW has the same recourse as with any other facility
(i.e., seek a warrant to enter the premises). In this case, the POTW should follow the denial of entry
procedures outlined in section 2.8.2.
In some instances, the POTW may employ an independent contractor to perform all or a certain aspect of
the inspection (e.g., sampling at the industrial facility). POTW personnel should consult with their legal
counsel to ensure that the POTW may, in fact, designate such contracted personnel as inspectors. This
designation must be made in accordance with the law. The POTW should be aware that contractors may
not perform functions that are inherently governmental, such as determining compliance or initiating
enforcement action. All inspectors (whether POTW or contractor) must follow the POTW's written
procedures for inspecting and sampling. The POTW is the ultimate authority when compliance
determinations or policy decisions are made that affect inspection and sampling activities.
The right of the government (federal, state or local) to enter an industrial facility, and the protection
against unlawful entry by the government, has been the subject of numerous court decisions. These court
decisions influence the manner in which a POTW inspector may enter a regulated facility. Several
decisions by the United States Supreme Court pertaining to the right to enter, and the use of warrants for
entry, have bearing on the POTW inspection process because these decisions define the limitations under
which a POTW inspector may lawfully gain entry to a regulated facility. The principal court case dealing
with these issues is Marshall v. Barlow's, 436 U.S. 307 (1978). Under this decision, the Court concluded
that where consent for the inspection was not voluntarily given by the facility, the inspector is required to
obtain an administrative warrant to gain lawful entry. The Court held that an inspector is not permitted to
24

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
enter the non-public areas of the worksite without either the owner, operator, or designated
representatives' consent or a warrant. The Court further established the conditions under which a civil or
administrative warrant can be issued by a judge or magistrate. These conditions are: 1) reasonable cause
to believe that a circumstance (e.g., a violation) addressed by a statute or ordinance (for a POTW this
would be a state statute and/or local ordinance) justifies a reasonable suspicion and 2) that the facility to
be entered was identified and selected by the POTW based on a pre-existing administrative plan or
scheme for entries. The basis for the "plan" or "scheme" was required by the Court to be "neutral". The
message of the Court was simply that the government (federal, state and local), through its field agents,
cannot "pick on" regulated facilities with subtle harassing techniques or through the exercise of entry,
search, inspection, investigation, or correctional rights or powers. The appropriate exercise of government
authority is not to threaten an industry. This is why it is important that the POTW develop an inspection
plan that is based on "neutral" conditions (e.g., geographical location) and to stick to this plan when
conducting site visits or to conduct the inspection when there is a justified suspicion of a violation. The
procedures that an inspector should follow when entry is denied are discussed in in Section 2.8.2.
There are two important exceptions to the limitations described above. In these two situations, there is a
right to enter without a warrant:
•	Emergency Situations: These are situations such as potential imminent hazard, as well as
situations where there is potential destruction of property or where evidence of a suspected
violation may disappear if time is permitted to elapse while a warrant is obtained. In an
emergency, when there is insufficient time to obtain a warrant, a warrantless inspection is
allowed. The POTW will have to exercise considerable judgment as to whether a warrant
should be served when dealing with an emergency situation. However, even in emergency
situations, the POTW would probably need the assistance of the police, sheriff, or fire
department to gain entry. During the time it takes to get this assistance, a warrant could
probably be obtained if there is close coordination with the POTW's legal counsel.
•	"Open Fields " and "In Plain View " situations: Observations by an inspector of things that are
in plain view (i.e., they can be seen by anyone in a lawful position or place to make such
observations) do not require a warrant. For example, an inspector's observations from the
public area of a facility or even from certain private property not normally closed to the public,
are also proper and valid. Further, even when a warrant is obtained for entry, those areas
outside of the warrant's scope are also "in plain view" so long as the warrant permits the
inspector to be where they are when they make such viewing.
More recently, in 2004, the James M. Knott, Sr., and Riverdale Mills Corporation ("Riverdale ") v Justin
Pimpare and Daniel Granz case was decided by the U.S. Court of Appeals for the First Circuit. The
plaintiffs alleged that the EPA agents conducted sampling of the plaintiff s wastewater discharge on
private property without warrant or consent, constituting a violation of the Fourth Amendment. The First
Circuit Court ruled in the EPA's favor, stating that the sampled wastewater, whether it was on private
property or not, is irretrievably flowing into the public sewer. The Court said that the law did not clearly
establish a Fourth Amendment right to expect privacy in industrial wastewater on its way to a public
sewer.
The inspector's authority is usually not limited to entering and examining the industry's treatment plant
(effluent sources) alone. The inspector may inspect other areas of the permitted facility as well. The
inspector should consult with the POTW's counsel to ensure a complete knowledge of the local law
which authorizes their activity. Coordination with the POTW's counsel is also important when situations
arise where entry is denied. Under these circumstances it may be necessary to contact the POTW's legal
counsel to gain entry into the facility.
25

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
2.8.2 Arrival for the Inspection
The inspector should enter the industrial facility in the following manner to avoid allegations of
"unreasonable search" or other procedural issues:
•	Arrive during normal business hours, unless it is an emergency situation or if other
arrangements have been made with the industry.
•	Enter the facility through the main gate, unless the facility has designated another point for
entry.
•	Locate the "person in charge" at the facility as soon as possible. Consent to enter the facility
must be given by the owner or operator, or their designated representative. The inspector should
learn who this individual is and develop a working relationship with that person. The inspector
may want to have several industry contacts to grant entry in case the primary contact is not
available. As long as the inspector is allowed to enter, the inspection is considered voluntary
and consensual. A clear expression of consent is not necessary because an absence of an
expressed denial is considered consent.
•	The inspector should present their credentials, or POTW identification, to the person first
encountered (e.g., receptionist or guard) and suggest that they contact the responsible industry
representative. The credential/identification indicates that the holder is a lawful representative
of the POTW and is authorized to perform pretreatment inspections. These credentials are
important documents and should never leave the possession of the inspector.
If the facility provides a sign-in sheet, log, or visitor's register, it is acceptable for the inspector to sign it,
as long as there is no restrictive language associated with it. The inspector must not sign any type of
"waiver" or release from liability form that would limit in any way the ability of the POTW to use the
information obtained during the inspection. The inspector must not agree to any such restrictive condition
of entry. In addition, the inspector must not sign any safety or personal harm waiver absolving the facility
of any injury that the inspector may incur while on-site. If the industry insists on such a waiver, the
inspector should politely explain that he or she cannot sign it. If the waiver is attached to a sign-in sheet,
the inspector should request a blank sign-in sheet. In some instances, it may be possible to simply cross
out the restrictive language before signing, obtain a photocopy and make a note about it. The inspector
should also look out for an indemnification statement or waiver statement when communicating with a
facility by emails.
The inspector should not sign any pledge of secrecy or confidentiality agreements or any agreement that
would limit the POTW's ability to disclose or use the information obtained while inspecting an industrial
user. Often, facility sign-in sheets include a clause that prohibits reporting of information seen in the
facility, in which case the inspector should not sign the form. This statement is not always on the same
page that the inspector is asked to sign, and the inspector should inquire as to whether the statement is
embedded elsewhere in the sign-in documents. If the inspector determines that he or she should not sign
the form, the facility must make other sign-in arrangements for entry into the facility. Such secrecy
agreements are not a legitimate precondition for inspector entry to the facility.
If the inspector is refused entry because they do not sign a release, they should leave and immediately
report all pertinent facts to their supervisor or, preferably, the POTW's legal staff. All events surrounding
the refused entry should be fully documented, and problems should be discussed cordially and
professionally. Officials at the regulated facility must not be subjected to any form of intimidation or
threats for their failure to allow an inspector entry to the premises. The inspector's authority to inspect
should not be abused, nor should the industrial user's right to refuse entry be undermined. Keep in mind
that the inspector is at the facility to conduct an inspection, not to see a specific individual. If the normal
contact is not in, the inspection should generally not be postponed.
26

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
The POTW inspector cannot be required to take a facility's safety training course prior to entry, but if the
company has a relatively short safety briefing that will not interfere with the inspector's ability to
complete the planned inspection, it is recommended that the inspector attend the briefing.
Reluctance to give consent. The receptiveness of facility officials toward inspectors is likely to vary from
facility to facility. Most inspections should proceed without difficulty. However, because compliance
inspections may be considered an adversarial proceeding to some industries, the inspector's legal
authority, techniques, and competence may be challenged. If consent to enter is flatly denied, the
inspector should follow the denial of entry procedures outlined below. In other cases, officials may be
reluctant to give consent for entry because of misunderstandings of responsibilities; for example, officials
may feel that the inspection is part of an enforcement proceeding against the company, that it is an
inconvenience to the facility's schedule, or other reasons that may be resolved through diplomacy and
explanation on the part of the inspector.
One of the typical obstacles encountered by the inspector is a receptionist refusing entry because the
inspector does not have an appointment. In this case, remind the receptionist that POTW staff are not
there to see a specific individual but to inspect the facility, therefore an appointment is not needed. If
entry is still refused, ask to speak to the environmental manager or owner of the facility. If that does not
work, follow the denial of entry procedures outlined below.
Another common obstacle is the statement, "There is nobody here who can authorize the inspection." In
this instance, ask to speak to a supervisor, or show the receptionist the section of the SUO that authorizes
the inspector's access to the facility. Do not threaten legal action, but clearly state the intent to inspect. Be
professional, assertive and persistent, but if entry still cannot be gained, follow the denial of entry
procedures outlined below.
Whenever there is difficulty in gaining consent to enter, inspectors should tactfully probe the reasons and
work with officials to overcome any problems. In any instance where there is a misunderstanding or
conflict due to the inspection, the inspector must avoid threats, inflammatory discussions, or other
unprofessional language. The inspector should be aware of their personal safety during such
confrontations and avoid actions that may enrage an individual who is irrational. If the situation is beyond
the ability or authority of the inspector to manage, the inspector should leave, report the situation to his or
her supervisor and consult with the POTW's legal counsel.
Persons not directly employed by the POTW accompanying the inspector. The consent of the owner or
agent in charge (i.e., industry representative) must be obtained for persons accompanying an inspector to
enter a site if they do not have specific authorization (e.g., acting as an agent of the POTW or the EPA). If
consent is not given, such individuals may not enter the premises. If consent is given, these individuals
may not view CBI unless officially authorized for access.
Access to facilities requiring security clearances. Certain federal, state, local, and private facilities,
including those with military, intelligence, public safety (airports, transportation terminals) or nuclear-
related activities may have special security or access requirements. POTW inspectors have the right to
gain access to these facilities to the same degree they have authority to enter any industrial facility that
discharges to their system, but it is necessary for POTW personnel to comply with any special entry
requirements. POTW inspectors must obtain the appropriate clearances for access to national security
information, or facilities, or restricted areas at federal facilities. Where compliance information has been
classified, restricted or protected for national security, all information is to be maintained in accordance
with the originating agency's requirements. This information should be treated as CBI and protected to
the same degree as other CBI (e.g., access to this information should be restricted and this information
should be kept under lock and key with only authorized personnel having access to the key). The POTW
should contact the facility prior to the inspection to do what is necessary to gain access to the facility (fill
out paperwork and provide identification and information to obtain clearance). In the interim, it may be
27

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
necessary to contact the state or the EPA Regional Office personnel to see if they have access to the
facility for assistance in conducting inspections at these facilities.
Denial of Entry. If an inspector is refused entry into a facility to conduct an inspection under an
applicable state or local law, the following steps should be taken:
•	Present Credentials/Identification. The inspector should show his or her credentials and/or
identification and present the documentation that provides the inspector the right to access the
facility (i.e., the industrial user discharge permit and the SUO).10
•	Tactfully Discuss the Reason for Denial. If entry is not granted, courteously ask why.
Diplomatically probe the reason for the denial to see if obstacles (such as misunderstandings)
can be resolved. If the resolution of these conflicts is beyond the inspector's authority, he or she
may suggest that the facility officials seek advice from their attorneys regarding a clarification
of the POTW's inspection authority and right of entry.
•	Carefully Record Observations. All observations pertaining to the denial should be noted
carefully in the inspector's notes or checklist. Specifically, note the following:
-	Facility name and exact address.
-	Name, title, and authority of the person who refused entry.
-	Name, address, and telephone number of the facility's attorney (if readily available).
-	Date and time of refusal.
-	Reason for the denial.
-	Facility appearance (e.g., neat and orderly or chaotic).
All of this information will be helpful in case a warrant is sought.
•	Avoid Threatening or Inflammatory Statements. Under no circumstances should the inspector
discuss potential penalties or do anything that may be construed as coercive or threatening.
•	Leave Premises and Contact Supervisor. If entry is still denied after attempting to resolve the
obstacles, the inspector should leave the premises after obtaining the information noted above
in the inspection notes or checklist. The inspector should contact his or her supervisor
immediately after leaving the premises, and the supervisor should confer with the POTW's
legal counsel regarding the desirability of seeking a warrant. The POTW's legal counsel should
attempt to resolve the conflict by contacting the facility's representatives prior to obtaining a
warrant.
Denial of Access Based on CBI. In some cases, entry to a facility may be denied based on a claim that
there is confidential information at the facility. In such cases, the inspector should inform the industry of
the relevant subsections of the state or local law regarding confidentiality so that they are clearly
understood by all parties involved. CBI procedures should also be included in industrial user permits and
the inspector should remind the industrial user of these permit requirements. The inspector should then
explain the procedures used by the POTW to keep information confidential. In this instance, it would be
helpful if the POTW had already notified the industrial user of its right to claim confidentiality and the
industrial user's response (assuming it acknowledges this right and agrees that information must be
provided to the inspector under the expectation that a valid claim will be honored by the POTW). If the
facility representative still refuses entry, the inspector should not contest the issue but should treat the
matter in the same manner as any denial of entry and follow established procedures for gaining entry (see
10 Note that inspectors are under no obligation to provide personal information such as social security numbers
and EPA inspectors must not provide any personal identification information.
28

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
discussion of Entry to the Industrial Facility later in this chapter). It is not appropriate for the inspector to
determine whether an industrial user's claim of confidentiality is justified. Once such a claim is made, the
information should be kept confidential until a determination is made by the POTW's legal counsel.
Withdrawal of Consent during an Inspection. Occasionally, a facility may consent to an inspection and
later withdraw the consent while the inspection is in progress. Consent for the inspection may be
withdrawn at any time after entry has been made. A withdrawal of consent is tantamount to a refusal of
entry. Therefore, the inspector should follow the procedures cited above under "Denial of Entry" unless
the inspection has progressed far enough to accomplish its purposes. All observations and findings
obtained prior to the withdrawal of consent are valid and may be used in an enforcement proceeding
against the facility.
Denial of Access to Parts of the Facility. If, during the course of the inspection, access to some parts of
the facility is denied, the inspector should make a note of the circumstances surrounding the denial of
access and of the portion of the inspection that could not be completed. The inspector should then proceed
with the rest of the inspection and should contact his or her supervisor after leaving the facility to
determine whether a warrant should be obtained to complete the inspection.
Downstream Sampling in Response to Denial of Entry. When access to a facility is denied, the inspector
should consider whether a sample should be obtained at a manhole immediately downstream of the
facility, if available. Sewer connections and manholes are within the POTW's right-of-way and the
POTW has legal access to them. The inspector should be aware of the potential uncertainty associated
with such a sample since there may be other facilities connected to that part of the sewer that also
discharge the pollutants of concern or dilute the wastestream. This type of sampling, however, may help
with any further enforcement actions or investigations that the POTW may undertake at the facility by
uncovering activities that the industry is attempting to hide. This type of sampling is also effective when
an on-demand inspection is being conducted because the POTW personnel can then compare the results
of sampling from inside and just outside the plant to see if they match. This can provide evidence of any
batches being dumped prior to entry to the facility.
2.9	Conducting an Inspection under a Warrant
As an alternative to conducting an inspection with the consent of the facility, inspectors may conduct
inspections under a search warrant issued by a magistrate or judge. If a search warrant is obtained prior to
the inspection, the inspection may be conducted whether or not the facility officials consent to the
inspection. Under these circumstances, it may be necessary to have the assistance of the police or sheriff
to gain entry. This situation would only occur where the POTW knows that entry will be denied to the
inspector. The Barlow decision from the Supreme Court (discussed earlier), authorizes the issuance of a
warrant to inspect facilities without showing possible cause that violation is occurring. When the POTW
seeks a warrant, it must show that it has the authority to inspect industrial facilities. Obtaining such a
warrant may be an appropriate part of the pre-inspection preparation process when the POTW suspects
that entry may be denied, either absolutely, or temporarily until processes or records can be altered, or
other actions taken to obscure violations of applicable pretreatment requirements.
2.10	On-Site Activities
The on-site activities conducted at the facility form the core of the inspection. Once on-site, the inspector
is responsible for developing a complete picture of the industrial users' manufacturing and process
operations, wastewater treatment operation, compliance activities, and records management. The success
of the inspection will depend upon the ability of the inspector to ask the right questions and to look
closely in the appropriate locations while on-site. This will require inspectors to become thoroughly
familiar with the facility's treatment processes and wastewater sources and treatment technology. The
principal goal of the industrial user inspection is to gather information that can be used to determine
29

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
compliance with all applicable requirements, including permit conditions, regulations, and other state or
local requirements.
An industrial pretreatment facility consists of wastewater treatment processes designed to remove
pollutants from wastestreams prior to discharge to the local sewer system. Pretreating these wastes is the
method used by many industries to comply with local waste discharge ordinances and permits, and also
federal and state regulations. The sources, amounts, and types of wastes generated at an industrial
manufacturing or processing site depend on the age of the facility, raw materials used, production
processes, and the ability to recover or recycle wastes generated as a result of industrial activity. Some
industries attempt to minimize the different wastestreams by controlling them at the source (i.e., pollution
prevention), while others gather all wastestreams together for treatment at one central location. The
inspector should also inspect all sumps, pits, sand/oil traps, other tanks, and gather information about
cleaning and pump out schedules. The inspector should review waste hauler manifests to check how often
waste is hauled, by whom, and where it is disposed.
Physical, chemical, and sometimes biological treatment processes are used by industrial users to separate
or remove pollutants from these wastestreams. These treatment processes should be closely controlled by
plant personnel to produce discharges that are acceptable to the POTW and meet the effluent limitations
in the industrial user's permit. To ensure that industrial dischargers meet all applicable requirements, the
pretreatment facility inspector should inspect each of the treatment processes or facilities at any industrial
site that has the potential to discharge wastes that could adversely affect the POTW (i.e., cause pass
through or interference). This section outlines the procedures used in the NPDES program for inspecting
industrial users.
2.10.1	Pre-lnspection Observations
Prior to entering the permittee's facility, the inspector should examine the facility's perimeter. By doing
this, the inspector may detect leaky storage areas and other general housekeeping practices at the facility
that might affect the discharge to the POTW. In addition, the inspector should also evaluate the
environmental conditions near the facility, such as vegetation, odor problems, or direct discharges to
streams. It may also be appropriate to take a sample at a manhole immediately downstream from the
facility (if available) to determine the nature of the flow from the plant. This type of sampling may
indicate problem areas that require further investigation. The inspector should verify whether there are
other users discharging to that manhole, or whether the facility being inspected is the only contributor of
discharge.
2.10.2	Opening Conference
Once identification/credentials have been presented and legal entry has been established, the inspector can
proceed with the on-site inspection activities. The on-site activities should begin with an opening
conference with facility officials to outline what will be covered during the inspection, the purpose of the
inspection, and the procedures that will be followed. The inspector should gauge the level of awareness of
the industrial user representatives with the POTW's role in the pretreatment program. This section
addresses the role of the inspector in the opening conference, along with relevant meeting agenda topics.
This section also describes possible mid-course adjustments that might be needed as a result of the
information discussed during the opening conference.
The opening conference establishes a forum for exchanging information between the POTW inspector
and facility personnel. This information exchange should focus on the inspection, but it does not need to
be limited to the inspection itself. The inspector should use the following principles when conducting the
opening meeting:
• Gain an early rapport.
30

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
•	Start the meeting on a positive and professional note.
•	Prepare and use any supporting information that will enhance the discussion (e.g., the industrial
user's permit, a copy of the local regulations or statute authorizing the inspection, pollution
prevention materials, technology transfer information which might allow the industrial user to
operate more efficiently.) If the inspector can provide the industrial user with information
which it might find useful, the inspector will be viewed as a resource and not a burden on the
facility.
•	Acknowledge that the inspection may disrupt daily facility routines, but assert that reasonable
efforts will be made to minimize such disruption.
•	Listen carefully and be willing to answer the facility representative's questions, but do not be
maneuvered into bending POTW policies/procedures or overstepping authority in an attempt to
accommodate them. For example, facility representatives may be curious about how they are
performing with respect to the requirements of the pretreatment program. Do not forget that the
inspector's primary objective is to inspect the facility for compliance with discharge
requirements. The inspector is not there as a consultant to solve technical problems for the
company, but if through the inspector's experience or technical expertise the inspector can
describe how similar problems have been handled successfully, the inspector may be able to
help the industry solve its problem. Be cautious about giving advice. It is not the inspector's job
to "advise" the industrial user on how it could come into compliance. Such information, if
followed, could be used as a defense in a future enforcement proceeding. The industrial user
has the primary responsibility to ensure compliance. It is the inspector's job to evaluate the
industrial user based on the requirements established in its permit or in the local SUO. A
cooperative working relationship developed during this opening meeting can set the tone for the
rest of the inspection. It can also be used as the foundation for strengthening ties between the
POTW and its regulated industries. If approached properly, the opening conference provides an
ideal opportunity for the inspector to function as a public relations liaison and educator. The
inspector should ensure that he or she provides tactful assistance before, during and after the
inspection, but does not provide information that the industrial user can use as a defense in a
later enforcement action. Inspectors should remember that they provide compliance assistance
rather than technical assistance. In other words, the primary role of the inspector is to make the
industry aware of their compliance requirements and evaluate whether they are meeting the
requirements.
•	By informing facility officials of the purpose and scope of the inspection, it may help to avoid
misunderstandings and facilitate the work of the inspector.
•	If the inspector also discusses the order in which the inspection will be conducted, it will
eliminate wasted time by allowing officials at the industrial user the time to make any requested
records available.
•	The inspector should schedule meetings with key industrial user personnel (perhaps
beforehand) to allow facility officials adequate time to spend with the inspector during the
inspection. It is important that a facility representative accompany the inspector during the
inspection, not only to answer questions about the facility and to describe the plant and its
operating processes, but also for safety and liability considerations. If these needs are discussed
prior to the inspection, it allows the industrial user an opportunity to make someone available.
•	The inspector should verify the pertinent sections of the industrial user permit (e.g., name and
address of the facility, discharge points) and proper use of the CWF, if applicable.
31

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
•	The inspector should verify which safety requirements (if any) are required at the facility, to
ensure that appropriate preparations were made.
•	Photographs are a useful tool for documenting inspection information, and may prove useful in
any enforcement proceedings against the facility. Facility officials, however, may object to the
use of cameras on their property (especially federal military facilities or defense contractors).
As discussed previously, the federal pretreatment regulations do not provide the specific
authority to take photos as the right of entry, therefore, the local pretreatment program should
adopt this authority in their ordinance or rules/regulations. If a mutually acceptable solution can
not be reached, and if photographs are considered essential for the inspection, the inspector
should conclude the inspection without photographs and consult the POTW's legal counsel for
guidance. If facility officials request that photographs be considered confidential, as with any
other information so identified, the POTW is obliged to comply with this request pending
further legal determination. When taking photographs, it may be useful for the inspector to use
a camera that takes pictures with the dates imprinted on the photograph. This can prove useful
when storing and retrieving photographs for enforcement purposes. Also, when taking pictures,
it is often useful to include reference objects in the photograph to judge the distance and size of
objects. This creates a more substantial picture of the scene and may be useful when pursuing
an enforcement action. The inspector might also find it helpful to make a note of each
photograph taken in the field notebook, including the location and general subject of the photo.
Refer to the EPA's 2006 guidance entitled Digital Camera Guidance for EPA Civil Inspections
and Investigations found at http://www2.epa.gov/sites/production/files/2013-
09/documents/digitalcameraguide.pdf.
Industrial users are required to report changes in the volume or character of pollutants in their discharge
to the Control Authority (see 40 CFR 403.12(j)). The inspector should always inquire whether any
changes have been made at the plant since the last inspection. This can be done during an official opening
conference or it may be done informally at the beginning of the inspection. If the industrial user has not
reported such changes, it should be considered a reporting violation and brought to the attention of
appropriate industrial user representatives, and the POTW's ERP should be followed to address this
violation.
2.10.3 Physical Plant Review
When an inspector performs an industrial facility site review, his or her primary areas of investigation
include the facility's pretreatment units, monitoring equipment, production processes, and chemical
storage areas. This overall review allows the inspector to review areas that may indicate problems with
plant operations or effluent limitations. In particular, the inspector should focus attention on areas of the
industrial user's premises where regulated pollutants are produced, pumped, conveyed, treated, stored or
sampled. This type of facility site review requires that the inspector understand fully the wastewater
treatment process(es) used at the industrial facility and how each process fits in with the overall treatment
scheme. The objectives of this type of comprehensive review are to:
•	Verify that the industrial user has been classified correctly, and if it is a CIU, that the correct
categorical standards are being applied.
•	Evaluate the flow of water used for production culminating in wastewater discharged to the
POTW, the facility's water consumption and distribution usage, and the hydraulics of the
facility's drainage and collection system.
•	Understand the flow of raw materials and any additives used in production as well as all end-
products, by-products, and other liquid, gaseous, and solid wastes resulting from the production
process.
32

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
•	Evaluate the wastewater characteristics. This is usually done by sampling. However, there are
many instances where visual observations can provide information about wastewater
characterization (e.g., presence of oil sheens, or failure to generate sludge).
•	Evaluate the industrial user's O&M activities.
•	Check the completeness and accuracy of the industrial user's performance/compliance records
(e.g., production levels and results of self-monitoring).
•	Verify that facility conditions are consistent with information in the POTW's industrial user
files.
•	Check Safety Data Sheets about specific chemicals used at the facility to make sure the
industrial user has the required chemical information on-site and to ensure that the industrial
user is aware of what chemicals are actually on-site.
In the course of the site visit, the inspector should become more knowledgeable about the facility's
process area, including areas that may indicate problems with effluent limits and overall operation and
maintenance of the facility. It is to the inspector's advantage to conduct the process area review as soon as
possible upon entering the facility. This prevents the permittee from altering any problem areas while the
inspector is conducting the opening conference or conducting other parts of the inspection, such as the
records review. After completing the preliminary discussions with the plant officials, the inspector is
ready to tour the facility. During the plant tour, the inspector should be alert to, and inquire about, any of
the following areas:
•	Vital treatment units out-of-service for repairs. The inspector should determine when the units
were taken out of service, the type of failure experienced, and when the units will be back in
service.
•	Equipment or operations such as special pumps, floating aerators in diffused air systems,
chemical feeders, construction, temporary structures, or any rigged systems intended to correct
operational problems.
•	Safeguards to prevent the discharge of untreated or inadequately treated wastes during electrical
failures.
•	Any evidence of spills and/or leaks, including in chemical storage areas that may enter the
sewer. The inspector should ask questions of the employees to see if they are familiar with any
required spill or slug control measures at the plant and to determine if the industrial user
provides training on safety or slug control measures. The inspector should determine if any
floor drains, trenches or sumps are containment only or if they function as conveyance to the
POTW or elsewhere (such as leach fields or hauled disposal).
•	Unauthorized discharge points and/or bypasses, channels, or other areas likely to experience
overflows. The inspector should determine if spills or unauthorized use has recently occurred as
a result of facility staff attempting to correct operational problems.
•	Disposal of collected screenings, slurries, sludges, or other by-products of treatment. These
materials, including wastewater, should be disposed of in a manner that prevents the materials
from entering navigable waters or their tributaries, and in accordance with all applicable waste
disposal requirements.
One of the principal areas that the inspector should evaluate is whether various changes to production or
discharge practices have occurred at the facility. Industries frequently make production changes because
of advances in technology and the availability of new products. Therefore, during the tour of the facility,
the inspector should inquire whether the permittee has made any changes to: production equipment;
33

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
production processes; raw material usage; amount of finished product; water use; waste treatment
processes; process wastewater discharge volumes, treatment or process chemicals; and other such
changes. The inspector should also inquire whether the permittee has modified any production process
that would change the pollutant loading to the POTW, and whether the POTW had been notified of such
changes. This is especially critical if the industry has limitations that are based on the CWF. The inspector
must assess the impact that changes in the discharge of wastewater will have on any existing limits based
on the CWF.
Finally, the inspector must ensure excessive flows are not used as dilution to meet any applicable
pretreatment limits. Flow increases are not the only sign of dilution as a substitute for treatment.
Evaluation of the water usage (e.g., running rinses without parts) compared with adequacy of treatment
may be a sign of dilution as a substitute for adequate treatment.
While not all inclusive, questions asked during this part of the inspection should include:
•	Why counter-current flow rinses aren't used as make-up water in previous heated "work tanks"?
•	Are conductivity meters used to determine when rinses need to be discharged?
•	Are flow restrictors in place to reduce continuous flow rinse tanks water usage?
•	Are flows to rinse tanks shut off when not processing?
If dilution is suspected at an industrial facility, the inspector should trace each relevant plumbing line to
determine where it originates. This may be very time intensive, but it is the only way to accurately assess
the existence of dilution at the facility, since it is unlikely that dilution lines will show up on any
schematics that the company provides. Based on discussions with facility representatives, comparison of
current conditions with past inspection reports, permit conditions, etc., and visual observation of the
facility, the inspector should document any changes in production processes or pollutant loadings in the
inspection report. If necessary, the inspector should follow up with the appropriate POTW personnel to
ensure that the industrial user discharge permit is revised to address these changes.
In addition, the inspector should check the appropriateness of monitoring locations, the existence,
condition and calibration of the permittee's self-monitoring equipment (both field and laboratory), and the
facility's maintenance program for this equipment. During the physical "walk through" of the facility, the
inspector should observe all areas that have current or potential problems. Each of these observations
should be carefully documented in the inspector's notes, or checklist. It is often useful when trying to
understand the industrial facility's process to follow the process in a sequential order of production.
Appendix A contains a list of general questions the POTW can use to assess the types of discharges from
an industrial user and the potential to impact the POTW. Appendix B includes questions that can be used
to assess conditions at specific types of industrial users (e.g., aluminum forming, battery manufacturing).
2.10.4 Self-Monitoring Program Review
The inspection should include a review of the permittee's self-monitoring program. To perform this
review thoroughly, it is the inspector's responsibility to be familiar with the monitoring requirements
contained in the facility's permit. The inspector should also be thoroughly familiar with all approved test
methods and the specified sample holding times and preservation techniques, or in the case of a complex
array of methods, the inspector should have a reference list available of the approved methods for those
samples required by the permit, (see Chapter 3 for an overview of appropriate holding times and
preservation and analytical methods for various pollutant parameters.)
The objectives of the self-monitoring program review are to confirm that: 1) sampling is conducted by the
industrial user in accordance with its permit; 2) sampling and flow measurement equipment are provided
as required in the permit and that they are being operated, calibrated and maintained properly; 3) the
34

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
analytical test methods used to evaluate pollutants or parameters specified in the industrial permit
conform with the EPA's regulations at 40 CFR 136; 4) samples collected are representative of the
industrial user's typical discharge; and 5) the industrial user is maintaining adequate documentation of all
sampling activities. When conducting the self-monitoring review, the inspector should verify that:
•	Flow measurement devices are in use (if required), adequately calibrated with logs of calibration
dates and are adequate to handle the expected ranges of flow rates.
•	Samples are taken at the locations prescribed in the industrial user permit.
•	The sampling location specified in the permit is adequate to provide a representative sample of
the regulated discharge.
•	The appropriate limits are being applied at the specified sampling locations.
•	The frequency of sampling is performed in accordance with the permits requirements and that this
frequency is adequate for the nature of the facility.
•	Samples are collected and preserved in accordance with 40 CFR part 136.
•	Samples are analyzed within the holding times and analyzed according to approved test methods
in 40 CFR part 136.
•	Observation that the industrial user is properly sampling for compliance purposes and observe the
industrial user when it conducts its measurements of flow and/or pH. It should be a common
practice for the inspector to take a pH sample and compare the results with the industrial user.
•	The industrial user has adopted and is implementing QA/QC procedures.
•	All sampling, monitoring, and laboratory equipment is in working order and has been operated,
maintained and calibrated per manufacturers specifications and at the required frequency.
•	Required logs are maintained and available for review (e.g., flow, O&M, pH calibration11 and pH
logs12).
2.10.5 Operations Evaluation
The operating factors at the facility range from qualitative factors such as the skills and aptitudes of the
operators (e.g., process knowledge and general aptitude) to physical deficiencies in laboratory equipment
or a lack of flexibility in process equipment. The evaluation of operation activities must focus on
wastewater treatment and laboratory analysis. This evaluation should be based on the following topics:
•	Policies and Procedures.
•	Staffing and Training.
•	Health and Safety.
•	Management controls.
Appendix C presents the basic review questions that an inspector may ask to evaluate the O&M activities
at the facility. These questions are detailed and comprehensive, and it is probably not necessary to cover
all of these points with each inspection. The POTW should make sure that these areas are covered during
the course of the industrial user's permit cycle. For example, if the industrial user's permit is issued every
three years13, the POTW should cover the O&M questions at least every three years, unless there are
suspected problems at the facility that relate to its operation and/or maintenance.
11	pH calibration logs can vary. Industrial users can use any format, including one that may come with the
instrument. Information logged typically includes, at a minimum, date of calibration and signature and initials of
person performing the calibration.
12	pH logs typically contain, at a minimum, date, time of sample, recorded pH value, and sampler initials
or signature.
13	See 40 CFR 403.8(f)(l)(iii)(B)(l): industrial user permit durations cannot exceed five years.
35

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Policies and Procedures. Written operating procedures and standard reference texts enable the operator
of the process lines or wastewater treatment equipment to achieve efficient plant operation. The
operations manual prepared for the facility is the most important reference that an inspector should review
when evaluating plant policies and procedures. Other reference materials that should be available relating
to the operation of the facility include manufacturer's literature, publications by professional
organizations such as the American Chemistry Council, and EPA publications.
Staffing. Staff interviews are an important component of this evaluation, and the questions outlined in
Appendix C can be used to ascertain the quality of the operations at the facility. The inspector should
make an attempt to interview the individual in charge of overall operation at the facility, the chief
operator (if different), specific unit process operators, and the laboratory staff, if they have a laboratory on
site.
Health and Safety. At all times, safe operating procedures should be followed by the industrial user's
personnel. Employees must be trained in emergency shut-down, fire control, and spill response
procedures, as well as in the use of safety equipment. Each of these areas can adversely affect the nature
of the discharge to the POTW by allowing unregulated or uncontrolled amounts of pollutants to enter the
POTW's system. The authority for such an evaluation is found at 40 CFR 403.8(f)(2)(vi) which requires
an evaluation of each SIU for the need to develop and implement a slug discharge control plan. The
inspector can request SDSs or required by OSHA and hazardous wastes records to assist in the facility
evaluation. The General Pretreatment Regulations include notification requirements to various authorities
of any hazardous waste discharge to a POTW. These notification requirements are found at 40 CFR
403.12(p). The inspector should also determine whether the industrial user is properly storing and
handling its chemicals to ensure that incompatible chemicals that may be discharged to the sewer are not
stored together. For example, caustic compounds must not be stored with acid compounds, as this could
cause an explosion.
Management Controls. Monitoring practices are a good indicator of both the emphasis placed on
operations and the operator's understanding of process controls. Factors affecting a facility's monitoring
capabilities are:
•	The sampling program.
•	Performance testing.
•	Analytical capabilities.
•	Record keeping practices.
An effective process control program is essential to a treatment facility's optimal performance. However,
process control cannot be quantified easily by the inspector, therefore, in most cases, the inspector must
rely on discussions with plant personnel to supplement available records and the technical evaluation.
Again, the questions outlined in Appendix C can be used to evaluate the quality of the facility's
operations.
2.10.6 Maintenance Evaluation
Facility maintenance of wastewater pretreatment equipment directly affects the ability of the facility to
run efficiently and to comply with its permit. There are two types of facility pretreatment equipment
maintenance that are generally conducted at industrial users:
•	Preventative Maintenance: Reduces the facility operating costs by eliminating breakdowns and
the need for corrective maintenance. It improves the facility's reliability by minimizing the time
the equipment is out of service. It increases the useful life of the treatment and process
equipment, thus avoiding the need for costly premature replacement that may cause an
interruption of wastewater treatment at the facility. Each of these items, if adequately
36

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
addressed, reduces the possibility of compliance problems at the facility. Therefore, it is
important that the inspector evaluate these areas to ensure compliance with all applicable
program requirements.
• Corrective Maintenance: Returns the malfunctioning equipment to operation. This has
compliance implications (see 40 CFR 403.16, Upset Provisions) because the malfunctioning
equipment may be in a treatment process necessary for compliance with the pretreatment
program requirements. Therefore, the inspector should evaluate the procedures the facility uses
to identify and correct instances of malfunctioning equipment.
The principal areas of concern for both the operations and maintenance of wastewater equipment
evaluation are: staffing and training, planning and scheduling, and management control (i.e., records
systems and inventory control). Only well trained, competent staff can be expected to perform adequate
physical inspections, repairs, and preventative maintenance. Maintenance of wastewater equipment is
complex and requires a variety of skills. Because many of these skills are not readily available, an
ongoing training program is essential. The planning and scheduling of maintenance is also essential for
effective preventative and corrective maintenance. Ensuring that an adequate plan and schedule is in place
is an important task for the inspector.
A detailed records system is the basis of any maintenance program. Records are used to establish the
maintenance histories of equipment, diagnose problems, and anticipate (and thereby avoid) equipment
failure, making records an effective tool for preventative maintenance. A central inventory of spare parts,
equipment and supplies should be maintained. The extent of the inventory should be adequate to avoid
process or treatment interruptions. A maintenance cost control system should be an integral part of every
wastewater treatment facility at the industrial user. Evaluating costs in this manner serves to control
expenditures and can be used as a baseline for future budgets. This will help ensure that all necessary
process and treatment equipment is operated continuously and effectively, thereby ensuring that the
regulated facility operates within the limits specified in its permit.
2.10.7 Best Management Practices and Equivalent Mass Limit Provision Review
Best management practices (BMPs) are management and operational procedures that are intended to
prevent pollutants from entering a facility's wastestream or reaching a discharge point. Some categorical
standards allow CIUs to implement BMPs in lieu of meeting a numeric limit while other standards require
compliance with BMPs as the categorical standard. Discharge permits issued to industrial users by the
POTW should describe BMP activities and recordkeeping that the industrial user must implement or may
be allowed to implement to reduce, or eliminate, self-monitoring requirements. The inspector should be
familiar with the BMP requirements in the industrial users' permit in order to thoroughly assess whether
the BMPs are still appropriate and are being adequately implemented.
An example of a BMP that Metal Finishing (40 CFR 433) and Electroplating (40 CFR part 413) facilities
are allowed to implement is the option of developing toxic organic management plans (TOMPs) in lieu of
sampling to demonstrate compliance with the total toxic organics (TTO) limits14. Additionally,
transportation equipment cleaners regulated under 40 CFR part 442 are allowed to seek approval of
development for a pollutant management plan (PMP) in lieu of monitoring for copper, mercury, and non-
polar material.15 (See section 3.2 for more information about TOMP and PMP requirements.)
14	For information on required contents of a TOMP see Guidance Manual for tmplementing Total Toxic
Organics (TTO) Pretreatment Standards (September 1985) http://www.epa. gov/npdes/pubs/owm0021 .pdf
15	For information on required contents of PMPs see Permit Guidance Document: Transportation Equipment
Cleaning Point Source Category (March 2001) at
https://www3.epa.gov/npdes/pubs/pretreatment_transportation_equipment.pdf
37

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
In some cases, BMPs are actually required categorical standards. For example, the Pulp, Paper, and
Paperboard (40 CFRpart 430) categorical standards require implementation of BMPs. Also, POTWs can
establish BMPs as local limits that industrial users are required to implement to meet the general and
specific prohibitions at 40 CFR 403.5.
BMPs can include such elements as:
•	Prohibitions of practices.
•	Timeframes associated with key activities.
•	O&M procedures.
•	Treatment requirements.
•	Practices to control plant site runoff, spillage or leaks.
•	Compliance certification, reporting and recordkeeping.
•	Sludge or waste disposal.
•	Drainage from raw materials storage.
POTWs may also impose additional requirements as BMPs. Depending on the industry being controlled,
not all elements may be necessary or appropriate.
SIUs are required to maintain records of BMP compliance in the same way that other records are
maintained, in accordance with 40 CFR 403.12(o). Therefore, inspectors should also ensure that proper
documentation of BMP compliance is being maintained by the industrial user.
During an inspection, the inspector should note whether BMPs are being properly implemented and
whether they are meeting all requirements specified in the permit. The inspector should also consult the
CFR in case more detail is provided about what BMPs are required for a specific CIU. The inspector
should ensure that the BMPs in use continue to be appropriate for current conditions at the facility.
Examples of BMPs used for the control of commercial sources of wastewater can be found in "Appendix
W - Best Management Practices Mini-Case Studies" of the "Local Limits Development Guidance
Appendices," EPA 833-R-04- 002B, July 2004 available at
http://www.epa.gov/npdes/pubs/final local limits appendices.pdf. The EPA fact sheet on BMPs can be
found at http://www.epa.gov/npdes/pubs/pretreatment streamlining 7.0.pdf.
The equivalent mass limit provision pertains to a provision at 40 CFR 403.6(c)(5) that allows, in limited
circumstances, the conditional use of equivalent mass limits in lieu of concentration-based limits to
facilitate adoption of water-saving technologies. CIU categories that have pretreatment standards
expressed as concentration limits alone are allowed to request that their concentration-based limits be
converted to equivalent mass. If the POTW allows this conversion and issues a permit with equivalent
mass limits, the continued applicability of the equivalent mass limit depends on the CIU's continued
compliance with certain requirements. The CIU must:
•	Maintain and effectively operate control and treatment technologies adequate to achieve
compliance with the equivalent mass limits.
•	Record the facility's flow rates through the use of a continuous effluent flow monitoring device.
•	Continue to record the facility's production rates and notify the Control Authority if the rates vary
by more than 20 percent from the production rates used as the basis for the equivalent mass
limits.
•	Continue to employ the same or comparable water conservation measures which made the facility
eligible for receiving the equivalent mass limits.
38

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
The inspector should review the CIU's information provided with its request for adoption of equivalent
mass limits and ensure that the facility is meeting the above conditions. A listing of which industries this
provision applies to, and more specific information about the provision to allow equivalent mass limits,
can be found in the fact sheet at https://www3.epa.gov/npdes/pubs/pretreatment streamlining 3.O.pdf.
2.10.8 Records Review at the Industrial User Facility
Every inspection should include an on-site review of industrial user records. These records contain a
variety of information that may be useful to ascertain the facility's compliance status with its permit
requirements. Examining these records, and ensuring that they are being maintained as required, is a key
part of the inspection process for the POTW.
Records and files may be stored in a variety of information retrieval systems, including hardcopy
materials and electronic files such as databases.16 Conducting an effective records review is an important
investigative skill for the POTW industrial user inspector.
Facility representatives may receive electronic production and flow data directly to their computers from
each station "on the floor". In cases like this, it may be necessary to review screen-shot data to verify
production and flows from the various "stations" (subparts) in the case of a production based categorical
standard. A long term average of both production and flow will help determine if the facility's equivalent
concentration permit limits should be revised taking into account the "+/- 20 percent change" rule of
thumb.
The inspector should ask the industrial user representative to provide a copy of the facility's wastewater
discharge permit. This shows that they know it exists, where it is, and if it is readily available. The
inspector should verify that the facility's operations meet permit requirements. Some of the information
needed to verify permit compliance can be obtained during the opening conference and compared with
the facility permit. This general information may include: correct facility name and address, correct name
of the facility contact, number and location of discharge point(s) to the POTW, and the facility's principal
products and production rates (where there are production-based standards in place).
The inspector should check for records that will verify that proper notification was made by the facility to
the POTW if: 1) discharges have changed from those stated in the industrial user permit (e.g., additional
discharges, significant increase in flow); 2) a permit violation has occurred (e.g., the permittee is required
to notify the POTW within 24 hours of becoming aware of an effluent violation and to resample and
submit results within 30 days); 3) any discharge of a hazardous material (as defined in 40 CFR part 261)
has occurred from the industrial user17; 4) notice of potential problems to be reported immediately
(including slug loads); 5) Notification of changes affecting potential for a slug discharge; or 6) a bypass
has occurred. These notification requirements are outlined in the federal regulations at 40 CFR 403.12.
The inspector should also check that the appropriate records are being kept for a minimum of three years
(as required at 40 CFR 403.12(o)). These records will likely include many of the following types of
information:
• Sampling and Analysis Data:
16	On October 13, 2005 the Cross-Media Electronic Reporting Rule (CROMERR) was published in the Federal
Register under 40 CFR, Part 3. CROMMER provides the legal framework for electronic reporting under all of
EPA's environmental programs. A POTW can accept electronic reporting from industrial users if it has been
approved by EPA to do so. If the POTW is CROMMER-compliant then the inspector must verily that the industrial
user has retained appropriate documentation of required self-monitoring reports.
17	This notification must be sent to the POTW, the U.S. EPA Regional Waste Management Division Director,
and the state hazardous waste control authorities.
39

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
-	Dates, times, and location(s) of sampling.
Sample type (e.g., grab or composite) and analytical methods used.
-	Dates of the analyses.
-	Name(s) of laboratory and sampling personnel.
Results of the analyses.
-	Original charts for continuous monitoring instrumentation and bench sheets for analyses.
Sample equipment calibration logs.
•	Self-Monitoring Reports and Records:
Self-monitoring reports (if applicable), including such permit required elements as flow,
pollutant parameters.
-	Documentation associated with BMP implementation.
•	Laboratory Records:
-	Calculations (e.g., bench sheets or laboratory reports).
-	QA/QC analysis data.
•	Facility Operating Records:
-	Daily operating log.
Summary of results of all laboratory tests run and other required measurements (if
applicable).
-	Chemicals used (pounds of chlorine per day, etc.)
-	Weather conditions (temperature, precipitation, etc.).
Sludge/RCRA disposal records and waste hauling manifests.
•	Slug Discharge Control Plan (if applicable):
-	When required, a properly completed slug discharge control plan should be available to
the inspector.
• Corrective Actions Documentation (if applicable):
-	When the industrial user is required under enforcement action to correct deficiencies, a
schedule and description of corrective actions should be available to the inspector.
The inspector should document all records review activities and should note all inadequacies,
discrepancies, or other problems disclosed or discovered during this review. Any identified problems may
warrant a more intensive investigation. This decision should be made by the inspector in conjunction with
POTW officials.
A primary objective of the records review at the industrial user includes a comparison of the bench sheet
data (if it is available) and laboratory report summaries to the values reported on the self-monitoring
reports submitted by the facility. This evaluation is critical to determine whether all required data are
correctly summarized on the self-monitoring reports received by the POTW.
Industrial users are required to maintain complete and accurate sampling records (40 CFR 403.12(o) and
40 CFR 403.12(g)) and failure to do so is a violation of the General Pretreatment Regulations. The POTW
should treat this failure to keep records as a violation and respond with the appropriate enforcement
response, as identified in its ERP. A review of facility records determines whether the industrial user is
40

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
complying with the sampling and the record keeping requirements of the General Pretreatment
Regulations contained in its industrial user permit. In particular, the inspector should verify, at a
minimum, that the industrial user is keeping the following records for all samples: the date and time for
each sample, the date(s) of each analysis, the exact place the sample was taken (i.e., location of the
sample point), the analytical techniques/methods used for all samples, the name of the person who took
each of the samples, the name of the person who performed the analysis, the results of each of the
analyses, and most importantly a complete COC form(s) from the sampler through the facility's contract
laboratory.
2.10.9	Obtaining Copies of Necessary Records
When copies of records are necessary the industrial user must make these records available in accordance
with 40 CFR 403.12(o). The inspector must consider how to retrieve and store the required records. The
following outline may be useful in determining the appropriate means of accessing and securing certain
records.
•	Written or printed records generally can be photocopied on-site. Portable scanners may be
available to the POTW inspector, but in the absence of this equipment, inspectors should be
authorized to pay a reasonable price for the use of facility copying equipment.
-	At a minimum, all copies made for or by the inspector should be initialed and dated for
identification purposes (see identification details below).
-	When photocopying is impossible or impractical, close-up photographs may be taken to
provide suitable copies.
•	Computer or electronic records may require the generation of hard copies. Arrangements
should be made at the time of entry or during the opening conference for these copies.
Photographs of computer screens may provide adequate copies of these records if no other
means are available. In some cases inspectors may want to obtain electronic files of facility
records.
2.10.10	Record Identification Procedures
Immediate and adequate identification of the records reviewed by the inspector is essential to ensure a
legally binding custody process which ensures the admissibility of the records in court. If an inspector is
called to testify, he or she must be able to identify positively each particular document and state its source
and the reason for its collection. This identification can be accomplished by initialing, dating, numbering,
and entering each of the records in the inspector's notes under the facility's name.
•	Initialing/Dating: Each inspector should develop a unique system for initialing and dating the
records and copies of records so that he or she can easily verify their validity. This can be done
by initialing each document in a similar position, or by another method, at the time of
collection. Both the original and the copy should be initialed in the same fashion. All record
identification notations should be made on the back of the document. The inspector must be
able to identify positively that he or she so marked the document.
•	Numbering: A copy of each document or set of documents substantiating a suspected
violation(s) should be assigned an identifying number unique to that document. The number
should be recorded on each document copy and in the inspector's notes or checklist.
•	Logging: Documents obtained during the inspection should be entered in the notes or checklist
by a logging or coding system. The system should include the identifying number, date, and
other relevant information, such as: the reason for copying the material (i.e., the nature of the
41

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
suspected violation), the source of the record (i.e., type of file, individual who supplied the
record), and the manner of collection (i.e., photocopy, other arrangement).
The originals of each document must be returned to the proper person or to their original location, and
related records should be grouped together for ease of reference. Confidential business records should be
handled according to the special confidential provisions discussed earlier in this chapter.
2.10.11 Closing Conference
To achieve the most effective results from the compliance inspection, the inspector must communicate the
draft results of the inspection promptly to the facility's management and/or operating personnel. The
inspector's discussion, however, should be limited to the specific observations and findings of the site
visit. During the closing conference, inspectors can answer final questions, prepare necessary receipts for
documents provided by the facility, provide information about the pretreatment program, and identify a
timeline for the facility to provide additional information requested by the inspector.
Even though a discussion of the inspection findings is important, certain precautions are essential when
conveying this information. The inspector should keep the following guidelines in mind when presenting
any findings from the site visit.
•	The inspector is not authorized to discuss with a facility what specific future enforcement
action may be taken or make violation determinations.
•	After the inspection, the inspector should follow-up with POTW legal counsel and escalate
enforcement, if necessary, according to the POTW's ERP.
•	If there are deficiencies identified during the inspection then the inspector may bring these
deficiencies to the attention of the industrial user representative while clearly noting that the
deficiencies are not necessarily violations and that all potential deficiencies may not have been
identified at the time of the inspection, but will be included in the report. Both deficiencies and
violations require follow-up. For example, improper spill containment is a potential for spills to
reach the POTW, this is a deficiency that needs to be acted on, but not necessarily resulting in
enforcement as a violation.
•	The inspector should inform the facility that the facility should take action to correct
deficiencies noted, but the inspector should be clear that the POTW has not waived its right to
pursue enforcement against any violations.
•	The inspector should refrain from recommending a particular consultant or consulting firm, or
any particular treatment system, method or practice, even if asked to do so. Inspectors should
tell the permittee's representative to contact a professional society or approved listing for
advice on how to come into compliance with all applicable permit requirements. Also, the
inspector may refer them to compliance assistance materials or websites.
2.11 Follow-Up Activities
Follow-up activities from the inspection are necessary because this is how the information from the
inspection is translated into an action by the POTW, for example, an enforcement action or decision to
modify the industrial user's permit. The POTW has the primary responsibility to ensure compliance with
all applicable pretreatment requirements, and the inspection is an important mechanism for achieving this
goal. Once the inspection has been completed, the inspector should review his or her notes to identify
areas that may require follow-up activities. Follow-up activities include: following-up on immediate
action that must be taken; proper documentation of the inspection; and uploading information into the
POTW's inspection tracking system. It is in the POTW's best interest to conduct timely follow-up
activities with the industrial user so that identified problems can be addressed as soon as possible. Such
42

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
follow-up activities will usually include some form of enforcement action in accordance with the
POTW's ERP, perhaps even formal enforcement action for significant violations.
2.11.1	Initiate Follow-up Actions
After the inspection is conducted, the inspector may need to initiate immediate follow-up actions.
Situations such as the following may warrant immediate action on the part of the inspector:
•	The industrial user is violating its permit requirements.
•	Identification of significant changes in processes or discharge practices.
•	The industrial user should be put on a compliance schedule to take corrective actions to address
deficiencies.
•	Unsafe conditions were found.
•	Other agencies must be contacted, such as hazardous waste authorities, OSHA, or the fire
department.
2.11.2	Inspection Documentation
It is up to the POTW to decide what format to use to summarize inspection observations and findings.
The report should be written shortly after the inspection while the observations and findings are still fresh
in the inspector's mind. Often, the report consists of a completed checklist, including narrative discussion
and photographs. The inspection checklist at the end of the chapter can be used by POTWs as the basis
for inspection reports. This report should be filed in the POTWs files for that industrial user for future
reference as background material for subsequent inspections. This report may be used as admissible
evidence in an enforcement proceeding.
Finalization of the inspector's report or checklist is one of the most important points of the inspection
process, yet it is often ignored. The need to file a clear and concise report that contains pertinent
information to be used as a basis for future permitting, compliance, and enforcement decisions cannot be
stressed enough.
Inspection documentation should accomplish the following three objectives: 1) organizes and coordinates
all information in a comprehensive, usable manner for use by the POTW's compliance personnel; 2)
identifies areas that may require follow up activity; and 3) provides significant background information
on the facility that can be reviewed prior to conducting subsequent inspections at the facility. The quality
of this documentation will, to a large degree, determine how effective these follow up activities will be at
the facility. The information in the inspection report must be presented in a clear, concise, and well-
organized manner. The information must be objective and factual, and should make no statements of
compliance determination or potential for enforcement. Of particular importance in the inspection report
are the following items:
•	Accuracy. The information in the report must be factual and based on sound inspection
practices. Observations in the report must be the verifiable result of firsthand knowledge so that
compliance personnel can depend on the report's accuracy when determining appropriate
follow-up action (if any).
•	Relevance: The information in the report must be relevant to the compliance status of the
facility. Irrelevant facts and data will clutter the report and may reduce its clarity and
usefulness. Personal comments and opinions must be avoided.
•	Comprehensiveness: All information pertinent to the industrial user's compliance status should
be organized as a complete package. Documentary support (e.g., photographs, statements,
sample results) accompanying the report should be referenced clearly so that anyone reading it
43

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
will get a complete, clear overview of the situation at the facility. The more comprehensive the
observations and findings the easier it will be for enforcement personnel to make a compliance
determination.
All documentation that is produced or collected by the inspector to provide evidence of suspected
violations should be part of the facility inspection file and can be used for documentation of the
inspection report. This type of documentation may include: the inspector's field notes, checklist,
statements, photographs, drawings and maps, mechanical recordings, and copies of records. In general,
the types of information contained in the report should reflect the type of information collected during the
inspection.
2.11.3 Tracking System
Every POTW should have systematic procedures for tracking industrial user problems, including records
of all problems kept in office files (such as updating the industrial user's fact sheet) or electronically, for
future reference. If the inspector took effluent samples as part of the site visit, the results of these tests
should be placed into the POTW's compliance tracking system (preferably automated) and appropriate
action (as defined in the POTW's ERP) should be taken if a violation is detected.
2.12 Inspection Checklist and Instructions
This industrial user inspection checklist can be used by POTW inspectors when conducting routine
compliance inspection at industrial users. This checklist may be altered by the POTW to meet its specific
needs. Some states and POTWs have already developed inspection checklists and they are free to
continue to use any checklist that aids in the collection of pertinent information.
The questions in the checklist are meant to guide the inspector to inquire about all relevant aspects of the
industrial user's facility. It is not meant to be limiting, and can be expanded upon, or reduced by the
inspector. The inspector is encouraged to add notes to any of the sections and the Notes Section at the end.
If the POTW inspector follows these checklist questions, all necessary compliance information should be
obtained during the site visit. Some of the information contained in the checklist may not change (e.g.,
industry name or NAICS codes) but the POTW inspector should continue to gather the information in
case of a change that might affect the discharge of pollutants to the POTW; for example, a new NAICS
code might indicate a new industrial process that may discharge additional pollutants to the POTW.
The inspector is the eyes and ears for the industrial user permit writer. What is observed in the field that
impacts the permit requirements, must be brought to the attention of the permit writer, so that the
industrial user permit can be modified or updated. For example, if the inspector finds a wastestream that
is not accounted for, the permit must be adjusted to recognize the wastestream.
These instructions are intended to be used in conjunction with the description of the inspection process
detailed in sections 2.10.3 through 2.10.8.
I. General Inspection Information
To expedite the inspection, the general information for this section of the checklist may be obtained and
written up in advance of the inspection. This section captures general information about the inspection
including industry name, date of visit, purpose for the inspection, names of inspectors and affiliations,
when the last inspection was performed and who conducted that inspection. The inspector should also
note whether the previous inspection identified deficiencies required to be corrected and whether the
corrections were made. The inspector should note whether the POTW has any enforcement actions
pending for this industrial user, and if so, an explanation should be provided. Also, the names, titles, and
phone numbers of the facility representatives that were present for the inspection should be documented.
This information will facilitate routine communication with the industry.
44

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
II.	General Facility Information
The inspector should obtain basic identifying information about the industrial user when conducting the
inspection, including: physical address and mailing address (the two are often different); the industrial
user's permit number and expiration date; industrial user classification (denote all applicable CIU
classifications); if it is a CIU, whether it is classified correctly (i.e., correct category and whether or not it
is an existing or new source), and if not, an explanation of the findings about incorrect classification(s);
and NAICS codes(s) (NOTE: there may be more than one NAICS code for a given facility).
The inspector should also check to see if the industrial user has a copy of its permit on file. If not, this
may be an indication that the industrial user does not understand or realize its obligations under the local
pretreatment program. The inspector should provide, in the inspection report, a brief description of the
facility (e.g., type of operation, general nature of the products produced, length of time in business, etc.)
or refer to it in the facility's fact sheet. The nature of the business operation should be understood by the
inspector. Therefore, the inspector should cover: how many employees the facility has; the number of
shifts per day; the hours of operation each day; the number of work days per week; whether there is any
seasonal production schedule (and whether this impacts number of employees); whether there are
regularly scheduled shut down periods and the nature of the operation including the products produced.
The inspector should also note the number of wastewater discharge points to the POTW and whether all
the discharge points are accounted for in the industrial user's permit. The inspector should also review
any available process or wastewater flow diagrams. If the inspector finds that there are any unregulated
outfalls in use he or she should note this. Any potential for by-pass should be investigated as soon as
possible to ensure that the POTW is not receiving pollutants of a kind or an amount that it cannot handle.
III.	Production/Process Areas
In this section of the checklist the inspector should provide more detail about the production areas by
identifying the amount of finished product produced and amounts of raw materials used and stored. It is
best for the inspector to follow the chronological sequence of the production process in the step-wise
sequence of production to comprehend the activities at the plant. The inspector should not allow the
industrial user contact to improperly direct or control the inspection or the sequence of the inspection.
How the inspection is conducted is up to the inspector alone. Once the inspector understands the
operation at the facility, a comprehensive schematic of the production/manufacturing process, water use
and wastewater production, and a step-wise description of all chemicals used or discharged during
production should be developed and compared on subsequent inspection visits.
The inspector should describe any substantial changes in manufacturing processes, that have occurred and
that are planned18. The inspector should note whether these changes were reported to the POTW.
Tracking such changes in a plant's operation is important and provides a history of the manufacturing
process to aid in future inspections.
Additional information about the process area(s) that can be collected include information on: possible
floor drains that discharge to the POTW (the inspector should note this fact, then consider if this
highlights an area that is bypassing necessary treatment); proper storage of process/raw materials; and
whether the industrial user uses water hoses in the production area as part of the production process, or
for a potential source of wastestream dilution. The checklist also prompts the inspector to collect
production process schematics.
18 EPA's defines substantial change as an "increase or decrease in volume of 20 percent" as stated in EPA's
Guidance Manual for the Use of Production-Based Pretreatment Standards and the Combined Wastestream
Formula (Sept. 1985).
45

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
The inspector should also note whether the industrial user is required to implement BMPs and check to
see that they are being properly implemented, and that the industrial user is maintaining BMP records, as
required.
IV.	Wastewater Production
The inspector should note the industrial user's water source and describe the wastestreams discharged to
the POTW. By reviewing the industrial user's water bills (and possible verifiable groundwater volumes
used in its processes) prior to the inspection the inspector should be familiar with trends in the industrial
user's water consumption and wastewater production. A mass balance approach should be taken to
pinpoint any areas of water loss or potential bypass. The checklist includes a list of typical types of
wastestreams at industrial users and the inspector should fill these out including flow information, when
available. The inspector should describe any substantial changes in wastewater flows that have occurred
and changes that are planned. It is important for the inspector to track any changes in the plant's
wastewater discharge practices. This information provides a history of the facility's discharge practices
and will aid in future inspections. The inspector should note whether these changes were reported to the
POTW. The inspector should determine whether any of the process wastewater is hauled off-site and
should note the name(s) of the haulers and the final destination of the hauled wastewater. The inspector
should also denote whether there is any dilution of the wastewater stream occurring or whether there is
potential for dilution. The checklist also prompts the inspector to collect wastewater production and
discharge point schematics.
V.	Pretreatment System
The wastewater treatment system at the industrial user must be operated and maintained in a manner that
allows the system to prevent the discharge of pollutants in excess of the industrial user's permit limits.
The treatment system is important to the industrial user's ability to control its discharge of pollutants.
Therefore, it is necessary for the inspector to evaluate the treatment system's condition and use/operation.
The inspector should check for the following items: equipment maintenance record keeping; instrument
calibration frequency; critical spare parts inventory; inadequate detention time or inadequate mixing in
the pretreatment tanks; and current condition/operational status. The inspector should also note whether
the pretreatment system operator is certified (if required in that state) and trained to properly run the
system.
The inspector should note whether the industrial user has a pH monitoring system, whether it is working
properly and whether it is a continuous pH monitoring system. The inspector should check to see if the
industrial user has policies for notifying the POTW of all pH violations (i.e., lower than 5.0 standard
units) and whether the industrial user has appropriately notified the POTW if any of these pH excursions
have occurred.
VI.	Slug/ Spill Control Plans, Best Management Practices
The inspector should note whether the facility has been required to develop and implement a slug
discharge control plan or spill plan. The inspector should review the plans to determine whether they are
still appropriate for current conditions. If the facility is not currently required to have a slug discharge
control plan and the inspector determines that it should be required, the inspector should note this and
explain the rationale for the requirement. The inspector should note whether the employees are being
adequately trained to report slugs and spills and who at the facility as the authority to halt the facility
discharge if spills or slugs occur. If an industrial user's permit authorizes the use of BMPs, the inspector
should verify that the industrial user is implementing the BMPs correctly and that required documentation
is available for review. The BMPs may be physical or procedural measures. The inspector may need to
physically inspect treatment and spill/slug prevention BMPs such as oil/water separators or berms around
chemical storage areas. The inspector may also need to review BMPs that consist of documentation or
46

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
procedures, such as, a TOMP or staff training procedures and schedules. Among other measures, BMPs
can include treatment (as discussed above) and proper chemical storage (discussed below).
Some BMPs may be required by industrial user permits, some permits allow the use of particular BMPs if
the industrial user elects to implement them, and some industrial users may implement BMPs voluntarily.
The inspector should review all of the BMPs implemented at the facility.
Some industrial user facilities implement EMSs. If facilities have EMSs that foster acceptable BMPs a
record of this activity should be noted. Some foreign companies do not recognize the term EMS
("Kaizen" for the Japanese and the EU), but have their own "continuous improvement" programs very
similar to an EMS. An overview of these should also be noted.
Because of global trade, ISO 14001 certification is also used at many facilities. ISO 1400 lwas developed
by the International Organization for Standardization to set out the criteria for creating and implementing
EMSs. It does not state requirements for environmental performance, but maps out a framework that a
company or organization can follow to set up an effective EMS. This certification should also be noted in
the facility's fact sheet. See http://www.iso.org/iso/iso 14001 - key benefits.pdf.
VII.	Chemical Storage
It is important for the inspector to trace the use of all process and non-process chemicals that may be
discharged to the sewer. The inspector should focus on areas where chemicals are stored, floor drains are
located, manufacturing is taking place, or areas of spill containment to determine which, if any, chemicals
are finding their way to the sewer. The inspector should verify that incompatible chemicals (e.g., strong
acids and bases, or chemicals that may interact to form toxic compounds) are not stored near each other in
the event of a spill.
The inspector should walk around all chemical storage areas to identify all chemicals stored onsite and to
note whether they are stored properly. The inspector should note whether there are any onsite spill control
measures to prevent spills from occurring and whether additional chemical containment is needed. Other
avenues for chemicals reaching the POTWs system besides spills should be considered, such as floor and
equipment washing procedures.
The inspector should note whether the industrial user is required to have a slug discharge control plan,
whether it is available onsite for review, if the plan is still adequate for current conditions, and whether
the industrial user has had any past slug discharges to the POTW. The inspector should also note whether
signs are posted in the facility informing employees about proper discharge practices. For example, signs
that warn employees not to wash any process wastewater down a sink.
Also, the inspector should be aware of the chemicals that are being used as biocides in the boiler
blowdown or cooling system blowdown because some of these chemicals (e.g., molybdenum compounds)
may interfere with the operation of the treatment plant or interfere with the POTW's final sludge use or
disposal.
VIII.	Sludge Generation
This section applies to industrial users that create and handle sludge. How the industrial user handles its
sludge is an indication of its commitment to the proper handling of all its wastes, liquid or otherwise. The
inspector should examine the industrial user's sludge disposal methods to ensure that no sludge from the
treatment system is being discharged to the sewer (except in accordance with a permit). Information
should be gathered about the sludge dewatering method used, amount of sludge generated, sludge
moisture content, disposal method, names of haulers and disposal locations, shipment/pick up frequency,
and quantity of sludge stored. The inspector should also ask to review sludge hauler manifests to ensure
that they are available for review and contain the same information provided verbally by the industrial
user representative during the inspection.
47

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
IX.	Hazardous Waste Generation
If the facility produces hazardous wastes (e.g., electroplating sludge), as defined at 40 CFR part 261, the
inspector should verify where the waste is being ultimately disposed, and ensure that it is not being
discharged to the POTW. The inspector should ensure that all hazardous wastes are properly drummed
and labeled; have not been held longer than 90 days, and should review hauler manifests to determine that
proper handling and hauling procedures are followed. The inspector should document any problems
identified with the hazardous waste and should notify the proper authorities.
X.	Solid Waste Production
The inspector should note what types of solid waste (other than sludge) are produced during the
manufacturing process. Examples of solid waste produced during processing that is not considered
hazardous waste includes food waste, cardboard waste, etc., that may be disposed of in a landfill,
recycled, or reused (e.g., food waste is often fed to livestock). Disposal methods and approximate volume
of solid waste produced should be documented. The inspector should ensure that solid waste is not being
discharged to the POTW and is being disposed of properly.
XI.	Monitoring, Record Keeping and Reporting
It is crucial for the inspector to evaluate the industrial user's monitoring, record keeping and reporting
practices because this information forms the basis of the POTW's regulation of the industry. If the
industrial user is not sampling correctly or if the samples are not analyzed using the required procedures,
the information derived from that sampling cannot be used to evaluate compliance. Likewise, if the
facility does not keep records, the POTW cannot know the conditions at the facility during the reporting
period. It is necessary for the inspector to compare the results of sampling to the actual reported values to
ensure that there are no discrepancies. If a discrepancy is found, the cause should be determined.
The inspector must determine if the current permit conditions are adequate to control the industrial user's
discharge to the sewer. The checklist questions are designed to give the inspector a comprehensive
overview of the industrial user's monitoring, record keeping and reporting procedures. If there are any
problems, the source of the problem should be determined.
XII.	Combined Wastestream Formula/Permit Limits
If the CWF is being used to calculate alternative discharge limits, the flow of each wastestream must be
known and measurable. The inspector should ensure that flow can be measured at all necessary points and
that flows are being measured correctly at these points. The inspector will need to evaluate any dilution
streams being discharged to the sewer and whether these streams are being used to meet any permit limits.
Dilution streams for purposes of the CWF might include: sanitary wastewater, boiler blowdown, non-
contact cooling water or blowdown, demineralizer backwash, cooling tower bleed-off, condensate, and
rainwater/stormwater, provided however, that these wastestreams do not contain a significant amount of
pollutants. The POTW may exercise discretion to classify whether these streams should be considered
unregulated wastestreams (40 CFR 403.6(e)). If it appears that dilution or unregulated streams are being
co-mingled with regulated streams prior to treatment, then the POTW should initiate the procedure to
have the permit changed and new limits applied. If appropriate, the POTW should also initiate any
applicable enforcement action as dictated by the POTW's ERP. In addition to dilution streams, the
inspector should check for any unregulated streams at the facility. Unregulated wastestreams for purposes
of the CWF include any wastestream that is not currently regulated by a categorical pretreatment standard
and does not meet the definition of a dilute stream. Determining such unregulated wastestreams requires a
familiarity with the categorical industry in question. Refer to the EPA issued Development Document for
more information on regulated and unregulated wastestreams for an industrial user in question. Also refer
to the EPA Guidance Manual for the Use of Production-Based Pretreatment Standards and the
Combined Wastestream Formula (September 1985) for more information on this topic.
48

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
XIII. Notes
The Notes Section is available for all other inspector observations such as any unusual conditions and
problems.
INDUSTRIAL USER INSPECTION CHECKLIST
I. (ioiiei'iil Inspection 111 Torin:ition
Name of industry:
Date of visit:
Visit start time:
Visit end time:
Inspection Type/Purpose
I I Scheduled
~	Complaint
~	Permit Renewal
~	Unscheduled
~	New Company
~	Spill/Slug
~	Enforcement
~	Follow-up
Name of inspectors/affiliation:
Printed name:
Signature Date:
Last inspection date:
Inspected by:
Did the previous inspection identify deficiencies that the industrial user was required to correct? ~ Yes DNo
Were deficiencies corrected? ~ Yes QNo
Explain:
List all observed noncompliance issues and any corrective action that has been taken, or is planned:
Provide the name(s) and title(s) of industry representative(s)
Printed Name(s)
Title/Phone number(s)
Email(s)
Signature
Date:
11, (ionoi'iil I' iK'ilitv Inlorniiition
Physical address of industry:
Mailing address of industry:
IU Permit Number:
Permit Exp. Date:
IU Classification(s):
NAICS Code(s):
Is the industrial user permit on file at the facility? ~ Yes QNo
If the facility is a CIU, is it correctly categorized? ~ Yes ~ No Explain:
Nature of operation and reason for industrial user classification:
Number of employees:
Number of shifts:
Hours of operation/Days per week:
Are there scheduled shut down periods ~ Yes ~ No
When:
Seasonal production? ~ Yes QNo
When:
Number of wastewater discharge points to the POTW:
49

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
All discharge points accounted for?
~ Yes ~ No
If no, explain:
III. Production/Process A rests
Comprehensive process description (identify raw materials, processes used, products produced/amount of finished product, and
wastes and their destination; attach a process diagram if available) or if in City's file, so reference:
Describe any substantial changes in manufacturing processes (changes that have occurred and changes that are planned):
Production and flows verified for Production-Based CIUs? ~ Yes QNo
Has there been any production or flow changes since the last inspection? ~ Yes QNo
If yes to either, has production or flow increased or decreased greater than 20% ~ Yes QNo
Did the industrial user report changes in process(es) to the POTW? ~ Yes ONo ONA
Describe the condition of process area(s):
Describe any housekeeping concerns:
Do floor drains/troughs lead to the POTW?	~ Yes ~ No
Are incompatible process/raw materials separated?	~ Yes ONo
Are pipes labeled/color coded with directional flow arrows for easy identification? ~ Yes QNo
Are temporary hoses in place as part of production? ~ Yes ~
Are temporary hoses in place as part of production? ~ Yes QNo
Is a comprehensive piping diagram available at the facility? ~ Yes ~
No
Are process tanks labelled? ~ Yes QNo QNA
Are storage tanks labelled? ~ Yes QNo QNA
Is the industrial user meeting its best management practices requirements? ~ Yes ONo ONA
How often is the production area cleaned?
What chemicals are used in the cleaning of the production area?
Is the wastewater generated from cleaning the production area discharged to the POTW? ~ Yes QNo QNA
Attach a schematic description of the production process(es) at the facility (or if in City's file, so reference).
IV. \Y si slew siler Production
Water source(s):
Water usage:
Is water consumption balanced with wastewater production? ~ Yes ONo
Explain:
Wastestream flow(s) discharged to the POTW (describe and include flow when available):
Production process(es):
Contact cooling water:
Boiler blowdown/makeup:
Evaporation (loss):
Non-contact cooling water:
Lawn maintenance/Irrigation (loss):
Are there any diversion meters in use (credit given for water used in final product, evaporation or lawn care)? ~ Yes QNo
50

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Sanitary:
Wastewater hauled offsite (include names of haulers and destination):
Other:
Sanitary:
(gpd) Process:
(gpd) Combined:
(gpd)
Describe any substantial changes in wastewater flow (changes that have occurred and changes that are planned):
Did the industrial user report changes in wastewater flow to the POTW? ~ Yes DNo DMA
Is dilution of the wastewater stream occurring, or is there any potential for dilution? ~ Yes QNo
Attach a comprehensive schematic of wastewater production and wastewater discharge points to the POTW's system or if in City's
file, so reference.
\ . I®rclrciitiiii'iit System
Does the industrial user treat its process wastewater prior to discharge to the POTW? ~ Yes QNo DMA
Type of pretreatment system (Describe and include comprehensive schematic description if available or if in City's file, so
reference):
Check which of the following are utilized for pretreatment prior to discharge to sanitary sewer:
1 1 Dissolved air floatation
1 1 Membrane Tech.
I~1 Ion Exchange
I~1 Biological Treatment
1 1 Centrifugation
1 1 Flow Equalization
1 1 Ozonation
1 1 Chlorinating
1 1 Chemical Precipitation w/Clarifier
1 1 Oil/Water Separation
I~1 Reverse Osmosis
I~1 Grit Removal
1 1 Sludge Filter Press
1 1 Grease Trap
1 1 Rotary Macro Screen
1 1 Solvent Distillation
1 1 pH Adjustment
1 1 Sand Trap
I~1 Sedimentation
I~1 Silver Recovery
1 1 Belt/Disk/Rope Oil Skimmer
1 1 CN Destruct
1 1 Hex Cr Reduction
1 1 Segregation of Streams
1 1 Surfactants
1 1 Work Tank Agitation
I~1 De-Foaming
I~1 Chelating Agents
~ Continuous flow
I I Batch
I I Combined
Condition/operation of pretreatment system:
~ Good
~ Fair
~ Poor
Explain condition rating
Are equipment maintenance records maintained and available for review? ~ Yes QNo DMA
Are equipment calibration records available, and are calibration frequencies adequate? ~ Yes QNo DMA
Does the industrial user have a critical spare parts inventory? ~ Yes ONo DMA
Is the detention time/mixing time in the pretreatment system adequate? ~ Yes QNo DMA
Is the pH monitoring system working properly? ~ Yes QNo DMA
Does the industrial user have a continuous pH monitoring system? ~ Yes QNo DMA
Is the pretreatment system operator trained and certified? ~ Yes QNo DMA
Is there an operator for each shift? ~ Yes QNo DMA
Has the system experienced operational/upset problems since the last inspection? ~ Yes QNo DMA
Describe:
VI. Sln«/Spill C ontrols, Host	I'rsictices
Who has the authority to halt the discharge from the facility should a spill or slug discharge occur?
How are employees informed of whom to call at the POTW in case of a spill or slug discharge?
Is the facility required to implement a slug discharge control plan? ~ Yes ONo DMA
51

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
If a slug plan is not currently required, should one be? ~ Yes QNo
Explain:
Is the slug discharge control plan appropriate for current conditions? ~ Yes DNo DMA
Does the permit require or allow BMPs? ~ Required? ~ Allowed? ~ Voluntary? ~ NA
Types of BMPs
~ Installation of treatment
~ Prohibitions on certain practices, activities or discharges
~ Requirements for operation and maintenance of treatment units
~ Timeframes associated with key activities
~ Compliance certification, reporting and records retention
~ Slug discharge control plan
~ Solvent management plan
I I Other
Description of Required BMPs:
Description of Allowed BMPs:
Description of Voluntary BMPs:
P2 Equipment/Practices in use:
~ Overflow Alarms
~ Aqueous Cleaning Solutions
~ Fog/Halo Spray Rinsing
~ Countercurrent Cascade Rinsing
~ Dragout Collection Trays
~ Seal-Less Pumps
~ Air Jets/Curtains
~ Horizontal Work Tank Negative Air Blankets
~ Electrolytic Recovery
~ Cartridge or Membrane Filtration
~ Aqueous Paint Stripping Solutions
~ Bead/Powder Blast Paint Removal
~ Biocide Addition to Lengthen Coolant Life
~ Centrifugation of Machining Coolant
~ Flow Restrictors
~ Overspray Recycle
~ In-Situ Recycle (Ion Exchange, Reverse Osmosis)
~ Conductivity Probes
~ Dead/Stagnant Rinse Tanks
~ Evaporation
Are BMPs installed correctly? ~ Yes O No ~ NA
If Yes, does the BMP require installation of further treatment technology? ~ Yes QNo DNA
Explain:
Does facility have its own EMS or a similar version? ~ Yes DNo DNA
Is the facility ISO 14001 certified? ~ Yes O No ~ NA
Corrective actions necessary? ~ Yes QNo DNA
Explain:
Completion Date:
52

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
N il. C hemicitl Slomgc
Chemical storage area (identify the chemicals that are maintained on site and how they are stored):
Any floor drains?
~ Yes ~ No
Any spill control measures?
~ Yes ~ No
Can chemicals reach floor drains if spilled? ~ Yes QNo
Is chemical containment needed? ~ Yes DNo
How often are floors washed?
What chemicals are used?
How often is equipment washed?
What chemicals are used?
Does the facility have the potential for a slug discharge? ~ Yes ONo
Is the facility required to have a slug control program? ~ Yes QNo
Is the slug discharge control plan available onsite? ~ Yes QNo
Is the slug discharge control plan still adequate? ~ Yes ONo
Has the facility had any past slug discharges? ~ Yes ONo
Are signs posted to inform employees about improper discharge practices? ~ Yes QNo
\ III. Miul<>c (ioiKTiilion
If the facility generates sludge or hauls regulated wastes, please complete the following information. (If not, go to next section)
Sludge dewatering method (plate/frame filter, belt press, rotating
drum vacuum, centrifuge, indexing paper filters, etc.):
Amount generated (55 gal barrel [bbl]/mo):
Where does the liquid from dewatering go?
Disposal method:
Sludge Storage (bbl):
Shipment frequency:
Manifests available? ~ Yes QNo
Sludge hauler(s):
Disposal location(s):
Is the sludge generated characterized as a hazardous waste? ~ Yes QNo
If yes, are hauling manifests available? ~ Yes QNo
Is any sludge sent off as a valuable raw material? ~ Yes QNo
Examples: Zn sulfate sold to fertilizer mfg.; hydrochloric acid pickle liquor for local POTW's coagulation and phosphorous
removal; spent sulfuric pickle liquor to formulate with ammonia for fertilizer; A1 hydroxide filter cake in alum form for sale to
POTWs; chrome/nickel sludge used to produce ferronickel alloy; etc.
I\. Ilit/:ticlous Wiislc (iiMicmlion
Is hazardous waste generated ~ Yes QNo QNA
Is hazardous waste discharged to the POTW ~ Yes QNo QNA
Manner of hazardous waste disposal:
Are hazardous wastes drummed and labeled? ~ Yes ONo
Are hazardous wastes held onsite for more than 180 days? ~ Yes QNo
Does the industrial user have hazardous waste manifests? ~ Yes QNo
Any other problems associated with hazardous waste? ~ Yes QNo
Explain:
\. Solid Wsisle Production
Are solid wastes (other than sludge) produced during manufacturing process? ~ Yes QNo
Describe the types and approximate volumes of solid waste produced:
53

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
Solid waste disposal method(s):
\l. Monitoring, Recordkeeping, iincl Reporting
Description of sample location:
Are there any concerns regarding the cleanliness or location of the sampling point? ~ Yes DNo
If yes, please explain:
Sampling method/technique:
Evaluation of self-monitoring data: ~ Yes QNo DMA
If yes, was self-monitoring adequate: ~ Yes DNo DMA
If not, explain why data was inadequate.
Who performs the self-monitoring analysis?
Are the permit requirements appropriate for:
Sample location(s)? ~ Yes ~ No If no, explain:
Permit limit(s)?	~ Yes ~ No If no, explain:
Sample method? ~ Yes ~ No If no, explain:
Sample frequency? ~ Yes ~ No If no, explain:
What changes, if any, are needed in the permit?
Samples are analyzed according to 40 CFR part 136	~ Yes ~ No If no, Explain:
method where they exist?
If alternative test procedures or modified methods are
used (40 CFR 136.4-6), were all requirements met?
Samples are analyzed within required holding times?	~ Yes ONo
Samples are analyzed in-house or contract?
If outside lab, what is the lab name?
Samples are preserved according to 40 CFR part 136? ~ Yes ~ No
Samples in required bottle type per 40 CFR part 136?
Samples are taken during periods of process discharge only?	~ Yes QNo
Chain-of-custody (COC) form is used?	~ Yes ~ No
If COC is not used, describe
documentation:
COC form is filled out properly?	~ Yes ~ No
Record Keeping
All information kept for 3 years? ~ Yes ~ No
All required information available, current and complete?	~ Yes QNo
54

-------
Industrial User Inspection and Sampling Manual
Chapter 2. Inspecting Industrial Users
•	The date, exact place, method, and time of sampling and the names of the person or persons taking the samples;
•	The dates analyses were performed;
•	Who performed the analyses;
•	The analytical techniques/methods used; and
•	The results of such analyses.
Explain:
Reporting
Did the facility report results of any more frequent sampling in the last reporting period? ~ Yes DNo
If so, were all results reported? ~ Yes ~ No Comments:
POTW notified of all violations identified by industrial user within 24 hours of becoming aware? ~ Yes QNo DMA
If NA, does the POTW do all the facility's monitoring? ~ Yes ~ No
Resampling results following violations identified by industrial user submitted within 30 days of becoming aware? ~ Yes QNo
Do sample results match what is reported by the industry? ~ Yes QNo
Explain:
Are there any violations that were not reported to the POTW? ~ Yes ONo
Explain:
Have bypasses been reported?
Have upsets been reported (CIUs)?
\l I. \\ jisteslrciims \ ori ion/C "om hi noil W'sislcslrcsim l-'onmihi
Can flow be measured at all sampling locations?	~ Yes ~ No
Are flows measured at each sampling location?	~ Yes QNo
What type of measuring device is used?
How often are the flow measuring device(s) calibrated?
Is there a calibration log for the flow meter?
Are dilution wastestreams present at the sample location?	~ Yes ONo
Is the CWF used at the facility?	~ Yes ~ No
How are the flows determined?
Is the facility using dilution to meet its effluent limits? ~ Yes ~ No Explain:
Should the facility be using the CWF? ~ Yes ~ No
Are there any new flows that need to be considered in the application of the CWF? ~ Yes QNo
Are there any dilution flows that have not been accounted for? ~ Yes ONo
55

-------
Industrial User Inspection and Sampling Manual	Chapter 2. Inspecting Industrial Users
56

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
3. SAMPLING INDUSTRIAL USERS
This chapter presents a detailed and comprehensive framework to be used by POTW sampling personnel
when conducting sampling and flow measurements at the facilities of regulated industrial users. The
purpose of this chapter is to familiarize POTW inspectors with proper sampling procedures and to
establish consistent procedures for all POTWs with approved local programs. This chapter will assist
POTW personnel in planning and conducting sampling activities at industrial users that discharge to the
POTW. The chapter is divided into nine sections to accomplish these objectives: frequency of sampling,
pollutants to be monitored, analytical methods for samples, Sampling and Quality Assurance Plan,
QA/QC procedures, pre-sampling activities, on-site sampling activities, flow measurement, and
compliance issues related to sampling and analysis. This last section discusses specific compliance issues
related to the POTW's and industrial user's compliance monitoring program and provides
recommendations for handling certain compliance information. POTW sampling personnel are
encouraged to read and understand the material presented in this chapter before beginning any sampling
activities.
An effective local pretreatment program must include the ability to collect and analyze wastewater
samples so that laboratory results are of high quality, defensible, and able to support the two primary
goals of the General Pretreatment Program. The first goal is to determine the impact of industrial wastes
from a particular industry or group of industries on the POTW's collection and treatment system,
including the impact on treatment plant operations, sludge management (including final use or disposal),
and receiving stream quality. The second goal is to evaluate compliance by all industrial users with
applicable pretreatment standards and requirements. In addition to these primary objectives, the POTW's
sampling and analysis program is designed to satisfy one or more of the following program objectives:
•	Verify that industrial user's sampling program complies with permit sampling requirements, or
other control mechanisms.
•	Verify the quality of self-monitoring data and accuracy of reporting.
•	Verify that sampling location(s) are representative.
•	Verify compliance with instantaneous, daily maximum, and monthly average effluent limits
(local limits or categorical standards).
•	Support enforcement actions.
•	Support development of local limits and, development/reissuance and revision of permit or
other control mechanism.
These objectives can only be supported if the data produced by sampling are adequate. The quality of the
data resulting from the POTW's sampling activities can be ensured by using the following procedures and
techniques: collecting representative samples; maintaining the integrity of samples through proper
handling and preservation; adhering to chain-of-custody and sample procedures required at 40 CFR Part
136; and practicing adequate QA and QC activities. Sampling and analysis of wastewater can be done
independently or in conjunction with a compliance inspection visit, and can be performed by the same or
different POTW personnel. If sampling and analysis are performed independently and by POTW
personnel different from the inspection personnel, it is strongly recommended that the sampling personnel
familiarize themselves with the procedures and guidelines used by the inspection personnel. Annual
POTW compliance sampling is required to provide information independent of the industrial user.
Sampling, just like inspections, can be announced or unannounced. The goal of the sampling visit will
determine whether the industry is notified. As with inspections, the sampling personnel can decide
whether or not to announce the sampling event to the industrial user. The sampling technician may want
57

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
to contact the facility beforehand to ensure that the industrial operations are representative of normal
operations and may need to contact the industrial user to inquire about current operations. However,
sampling during atypical operations (i.e., maintenance) may evaluate whether or not effluent limits are
violated during such operations. Or, the sampling technician can simply show up unannounced. On-
demand sampling visits, which may be in response to known or suspected problems or in response to a
complaint or may be intended to evaluate compliance on a typical discharge day, should be unannounced
so that the facility does not have time to alter any of its activities. Industrial users may choose to take a
sample at the same time and place as the POTW sampling technician (or request split samples from the
POTW sampling technician) and this is acceptable.
In the pretreatment program, the vast majority of sampling will be routine compliance evaluation
sampling mandated in 40 CFR 403.8(f)(2)(v). In these situations, it is necessary for the POTW to ensure
that the sampling data collected will be of a quality sufficient for the POTW to draw a proper conclusion
about the compliance status of the facility and to ensure that the data will be viewed as credible evidence
substantiating the POTW's position should an enforcement action be pursued. This is the fundamental
objective of any sampling carried out for compliance and enforcement purposes, and when developing
local limits, since the basis for these limits must be justifiable and defensible.
There may be situations where other types of sampling may be conducted by the POTW, not intended for
meeting more extensive routine compliance sampling requirements. In these situations, samples may be
collected from the process or treatment system prior to the final effluent. Examples include operation or
maintenance evaluations, or the POTW may conduct a wastestream verification study to ensure all
pollutant sources have been accounted for. If a sample is to be used for other than compliance evaluation
purposes, it need not comply with the strict requirements of compliance sampling (i.e., to obtain results
that are admissible in court). However, POTW personnel must be aware that results of these studies may
identify new outfalls, or other conditions, that may need to be accounted for in the industrial user permit,
requiring permit or other control mechanism modification. POTWs are reminded that if samples are
collected at the permitted sampling point using approved sampling and analytical procedures, then the
results of the sampling must be used in the determination of industrial user compliance.
3.1 Frequency of Sampling
Similar to requirements for annual compliance inspections (section 2.2) the General Pretreatment
Regulations require POTWs to sample each SIU at least once each year, except for NSCIUs and MTCIUs
(defined in Section 2.2). Both NSCIUs and MTCIUs are CIUs and subject to categorical pretreatment
standards and requirements. NSCIUs are CIUs that are no longer SIUs. Sampling is not required by the
POTW at NSCIUs, however, if during the inspection or certification evaluation19, the POTW determines
that the industrial facility no longer meets the criteria of NSCIU in 40 CFR 403.3(v)(2), the facility
reverts to a CIU and annual sampling, as an SIU subject to categorical pretreatment standards, must be
reinstated. POTWs must randomly sample and analyze the effluent from MTCIU at least once every two
years. Again, if during the inspection or sampling the POTW determines that the industrial facility no
longer meets the criteria of MTCIU in 40 CFR 403.12(e)(3), the facility reverts to an SIU and annual
sampling, as an SIU subject to categorical pretreatment standards, must be reinstated.
If the POTW decides to conduct all monitoring for an industrial user, in lieu of requiring the industrial
user to conduct its own self-monitoring, the POTW must meet the following minimum sampling
frequencies: at least twice a year for SIUs; at least once a year for MTCIUs; at least once during the
effective period of the industrial user's control mechanism for CIUs with monitoring waivers; sampling is
not required at NSCIUs, as they are not SIUs.
19 This evaluation is described in section 2.2.
58

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Factors the POTW should consider when establishing sampling frequencies beyond the minimum
requirements are discussed in the EPA's Guidance Manual for POTW Pretreatment Program
Development (October, 1983).
3.2 Pollutants to be Monitored
The pretreatment regulations at 40 CFR 403.8(f)(2)(v) require POTWs to randomly sample and analyze
the effluent from industrial users in order to identify, independent of information supplied by industrial
users, occasional and continuing noncompliance with pretreatment standards and requirements in
industrial user permits or other control mechanism. In order to ensure that industrial users are meeting
established limits, the POTW must sample and analyze all pollutants that the industrial user is required to
monitor for in its control mechanism. The pollutant parameters established in the industrial user permit
are either required to be regulated (i.e., categorical limits) or were deemed warranted for regulation when
the POTW wrote the established limits (i.e., applicable local limits or other limits). Therefore, to verify
self-monitoring results submitted by an SIU, the POTW must sample all parameters that the industrial
user is limited for, at least annually.
Industrial user permits (or other control mechanisms) must also specify which pollutants must be
monitored by the permittee. The POTW may decide to require sampling for additional parameters based
on changes in processes or discharge practices, or to investigate whether the industrial user is a source of
a pollutant found downstream. If new processes or products have been introduced at the industrial user,
additional sampling will help provide the basis for necessary control mechanism modifications.
The General Pretreatment Regulations allow some CIUs to reduce self-monitoring frequencies and/or the
pollutants they are required to monitor. Examples of reduced monitoring options include:
•	Where the approved pretreatment program has incorporated applicable provisions, the
regulations at 40 CFR 403.12(e)(2) allow CIUs to opt out of monitoring for pollutants that they
demonstrate through sampling and other technical factors20 that the pollutants are not present in
the process wastewater or not expected to be present (often referred to as a "pollutant not
present" waiver). These CIUs may be granted a monitoring waiver from the POTW and must
meet certain conditions in order to continue to opt out of sampling for these parameters. These
conditions are listed at 40 CFR 403.12(e)(3). If the conditions are not met, the CIU must begin
to sample for all applicable categorical standards and can no longer practice reduced
monitoring. Industrial users must submit a new request for a waiver for each permit cycle.
•	Electroplaters (40 CFR part 413), metal finishers (40 CFR part 433), electrical and electronic
component manufacturing (40 CFR part 469) are allowed to develop a TOMP, referred to as a
solvent management plan in the regulation, in lieu of monitoring for the applicable TTOs. After
the POTW has determined that the plan is complete and appropriate for the facility, a CIU that
implements this option is required to certify annually that none of the listed toxic organics have
entered its wastestream and that it is implementing its TOMP. The CIU must also submit and
sign the required certification statement.
•	Transportation equipment cleaners regulated under 40 CFR part 442 can opt out of monitoring
for copper, mercury, and non-polar material if they submit a certification statement and prepare
and implement a PMP that meets requirements specified at 40 CFR 442.15(b)(2), 40 CFR
442.15 (b)(5)(i)-(x) and 40 CFR442.16(b)(5)(i)-(x).
20
"Other technical factors" may include a facility-wide accounting of raw materials, products, by-products, and
other chemicals with the potential to be discharged or spilled and SDSs as evidence that a particular pollutant is not
present.
59

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
The regulations at 40 CFR 403.8(f)(2)(v)(A) specifically require POTWs that have granted a CIU a
pollutant not present waiver to sample for the waived pollutants once during the permit cycle (in addition
to the regulated pollutants that must be sampled annually).
The regulations do not specifically require POTWs to conduct compliance sampling for TTOs when a
CIU implements a TOMP, or for copper, mercury, and non-polar material (for TECs) when a CIU
implements a PMP. Although CIUs may be allowed to reduce monitoring frequency via the use of
TOMPs or PMPs, the regulations at 40 CFR 403.8(f)(2)(v) require that POTWs ensure independently that
CIUs are in compliance with numeric categorical standards and that any of the monitoring alternatives
used are effective and properly documented or certified, as required. The most effective way to verify
compliance is for the POTW to conduct compliance monitoring of all regulated pollutants. For CIUs that
implement a TOMP or PMP, EPA strongly recommends that POTWs collect at least one compliance
sample during the term of the CIU's permit cycle to confirm that no changes have occurred and that the
TOMP or PMP is still effective. EPA has concluded that the most appropriate time to conduct this
monitoring is during the renewal of the permit. However, EPA also asserts that the timing is best left to
the discretion of the POTW. If the POTW's sample results show noncompliance, the POTW can require
the CIU to conduct sampling for the regulated parameters and take remedial actions necessary to come
into compliance with applicable standards as expeditiously as possible.
Inspectors should review TOMPs and PMPs during inspections to ensure that they remain appropriate for
existing conditions. Inspectors should also review recordkeeping associated with TOMPs and PMPs to
assess whether all certification requirements are being met.
3.3 Analytical Methods
POTWs with approved pretreatment programs may, at their discretion (as authorized by their local
ordinances and regulations), require their indirect dischargers to achieve specific minimum levels when
performing analyses or may require the use of specific analytical methods to enable the POTW to better
characterize contributions into their system. Where a state or the EPA is the pretreatment Control
Authority, the specific requirements for analytical methods can be specified in the control mechanism
issued to the indirect discharger. The General Pretreatment Program requirements at 40 CFR part 136 and
40 CFR 403.12(g)(5) require that samples be analyzed using the approved methods listed in 40 CFR part
136. Inspectors should be aware that oftentimes labs use incorrect solid waste analysis methods (e.g., SW-
846) for wastewater analysis. These results are not acceptable under the pretreatment program. The
approved analytical methods for analyzing wastewater samples can be found at 40 CFR part 136
(http://www.ecfr.gov/cgi-bin/text-
idx?SID=84cf955ff2ed8al77336883e83603dll&node=Pt40.23.136&rgn=div5).
The EPA Office of Water analytical methods website is
(http://water.epa.gov/scitech/methods/cwa/index.cfm').
The inspector and laboratory analyst should consult the current regulations at 40 CFR part 136 as
analytical methods may be updated and/or deleted.
The methods in 40 CFR part 136 are derived from six different sources (see "approved CWA methods"
https: //www. epa. gov/cwa-methods: (1) Methods for the Chemical Analysis of Water and Wastes, EPA-
600/4-79-020, revised March, 1983; (2) other EPA sources such as the Office of Water, Office of Science
and Technology, Engineering and Analysis Division; (3) Standard Methods for the Examination of Water
and Wastewater; (4) ASTM International; (5) Methods for Analysis of Inorganic Substances in Water and
Fluvial Sediments - United States Geological Survey; and (6) additional sources.
60

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
3.3.1 Alternate Test Procedures and Modified Methods
POTWs and industrial users can apply for approval to use alternate test procedures not listed in 40 CFR
part 136 if they can prove that the proposed method of analysis is comparable to the method listed in 40
CFR part 136. This alternate method must be approved by the EPA if the results are to be used to comply
with 40 CFR 403.12(g)(5). The POTW is not allowed to grant this variance with analytical methods. The
application and approval procedures for instituting an alternative analytical method are outlined in 40
CFR 136.4 and 136.5. The EPA's alternative test method protocols entitled Protocol for Review and
Validation of Alternate Test Procedures for Regulated Organic and Inorganic Analytes in Wastewater
Under EPA's Alternate Test Procedure Program, Protocol for Review and Validation of New Methods for
Regulated Organic and Inorganic Analytes in Wastewater Under EPA 's Alternate Test Procedure
Program (February 2016) and EPA Microbiological Alternate Test Procedure (ATP) Protocol for
Drinking Water, Ambient Water, Wastewater Monitoring Methods (September 2010) can be found at:
https: //www. epa. gov/cwa-methods/alternate -te st-procedu re-documents.
It is important that the POTW work with reputable laboratories21 that understand the analytical
requirements at 40 CFR part 136 and stay current with methods updates. The laboratory manager can
assist POTW staff with determining the most appropriate methods. Choosing the appropriate analytical
method for the samples collected is an important task. If more than one method is listed for a parameter
(which is common), the method which is chosen should be based on the effluent limit in the control
mechanism and what the detection limit is for that parameter and for that specific analytical method. The
method used must not have a higher detection limit than the effluent limit stated in the control
mechanism. The inspector should check with the analytical laboratory about detection limits for certain
methods because detection limits for methods will vary with different matrices and laboratories must
establish their own method detection limits using Appendix B to 40 CFR part 136. Laboratories must use
the most recently promulgated version of 40 CFR part 136 Appendix B that can be found at
http: //www. ecfr. gov/cgi-bin/text-
idx?SID=5dlla60e659eaac007bb4dc4917ae3fd&mc=true&node=ap40.23.136 17.b&rgn=div9. The
POTW is responsible for ensuring that its contract laboratory has the capability to meet required detection
levels. If the POTW's current laboratory cannot meet these requirements, the POTW should contract with
a laboratory that can.
The application and approval procedures for instituting an alternative analytical method are outlined in 40
CFR 136.4-5. Examples of allowable modifications to approved methods and related documentation
requirements are detailed at 40 CFR 136.6, which allows analysts the flexibility to modify approved
methods or to employ the use of a modified method provided the requirements detailed in that section are
met. Additional information regarding alternative testing procedures and the flexibility to modify
approved test methods may be found at http://water.epa.gov/scitech/methods/cwa/atp/index.cfm.
Permittees or state or EPA regulators with questions regarding requirements related to alternative test
procedures or allowed modifications to approved methods should check with their EPA regional ATP
coordinators. A list of Regional ATP Contacts is available in Appendix C of Protocol for Review and
Validation of Alternate Test Procedures for Regulated Organic and Inorganic Analytes in Wastewater
Under EPA's Alternate Test Procedure Program and Protocol for Review and Validation of New
Methods for Regulated Organic and Inorganic Analytes in Wastewater Under EPA's Alternate Test
Procedure Program found at https://www.epa.gov/cwa-methods/alternate-test-procediire-dociiments.
See also:
• 40 CFR 136.4, Application for and approval of alternate test procedures for nationwide use.
21 Many states have their own laboratory accreditation programs. POTWs should consult these standards, if
applicable, when seeking a reputable laboratory.
61

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
•	40 CFR 136.5, Approval of alternative test procedures for limited use.
•	40 CFR 136.6, Method modifications and analytical requirements.
•	40 CFR 136.7, Quality assurance and quality control.
3.4	Sampling and Quality Assurance Plan
In order to ensure the quality of POTW sampling, the POTW should develop a general plan that lays out
all of its procedures for conducting sampling to meet the requirements under its pretreatment program22.
Here, this plan is referred to as the Sampling and Quality Assurance Plan, or simply the plan. Many
POTWs have a plan(s) that encompasses the information suggested here, but they are called something
different, such as SOPs. It does not matter what it is named, however, it is important for POTWs to have
documented procedures for: QA/QC, sample equipment maintenance, sample collection, sample
documentation, sample shipping, chain-of-custody procedure and safety. This plan should be used by all
inspectors and/or sampling personnel so that samples are collected consistently and the data are of high
quality and will be admissible in court, if necessary. The plan should ensure that representative samples
are collected; 40 CFR part 136 sample collection and preservation procedures are followed; sample
integrity is maintained; safe practices are followed during sampling events; and QA/QC procedures are
followed. The inspector should contact the laboratory in advance of any sampling to discuss the sampling
plan and QA/QC procedures, to allocate laboratory time, and obtain sample identification numbers and
field and trip blanks.
The Sampling and Quality Assurance Plan should be a guide, or reference, for inspectors and sampling
personnel. Based on review of the Sampling and Quality Assurance Plan, the inspector or sampling
personnel should customize a sampling action plan specific for each industrial user. The Sampling and
Quality Assurance Plan, in general, should lay out all preparation and sampling actions for the sampling
team. Not all items in the POTW's plan will apply to all industrial user sampling events. In certain
situations, the inspector and sampling personnel may need to deviate from procedures outlined in the plan
due to uncontrollable circumstances at the industrial user facility. The inspector has discretion to deviate
from the plan if, in the opinion of the inspector, circumstances at the facility warrant such a change.
Whenever possible, however, the elements in the plan should be followed for consistency. If
circumstances arise in the field that make it unrealistic or physically impossible for the procedures to be
followed, the inspector should document any deviation from the plan and the reason for the deviation. See
Appendix J for suggestions for elements to be included in a Sampling and Quality Assurance Plan.
3.5	Quality Assurance/Quality Control (QA/QC) Procedures
QA/QC procedures are tools that are necessary to maintain a specified level of quality in the
measurement, documentation, and interpretation of sampling data. The QA/QC procedures the POTW
will use to assure data of good quality for both POTW sampling and industrial users and for industrial
user self-monitoring should be specified in the Sampling and Quality Assurance Plan. Quality Assurance
is the program function used to prevent mistakes and assure the quality of measurement data, while QC is
the process of carrying out those procedures stated in the QA Plan. The QA activities of the plan should
be general while QC activities are specific. A QA program should control the quality of the data through
use of set procedures to meet the program requirements. A QC program is designed to ensure the routine
application of procedures necessary for the measurement process to meet prescribed standards of
performance (e.g., through instrument calibration and analysis of reference unknowns). A program
describing the schedule for calibration is QA, while the actual calibration procedures are QC.
All data generated or used by the POTW must be of known, defensible, and verifiable quality. This
includes data that are generated through self-monitoring at the industrial facility. Therefore, the industrial
22 Refer to the EPA's Guidance Manual for POTW Pretreatment Program Development
62

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
user should also have QA/QC procedures in place to ensure the adequacy of the data submitted as part of
its periodic compliance report. All inspections, and the data obtained as a result of the inspection, have the
potential to be used in an enforcement proceeding and should be treated as potential evidence to be
admitted in court.
To produce evidence that is admissible in an enforcement action, QA and QC procedures are necessary
both in the field (during sampling) and in the laboratory. The QA/QC procedures used in the field are
separate from those used in the laboratory, but both are crucial for obtaining reliable data. Both laboratory
and field QA/QC are discussed in this section. QA/QC procedures are used to obtain data that are both
precise (degree of closeness between two or more samples) and accurate (degree of closeness between the
results obtained from the sample analysis and the true value that should have been obtained). By
following QA/QC procedures, the POTW's confidence in the validity of the reported analytical data is
increased.
3.5.1 Quality Assurance Procedures for Sampling
A QA program for sampling equipment and for field measurement procedures is necessary to ensure data
of the highest quality. The inspector should recognize the importance of implementing quality assurance
in sample collection to minimize such common errors as improper sampling methodology, poor sample
preservation, and lack of adequate mixing during compositing and testing. Again, each of these activities
should be a part of the POTWs Sampling and Quality Assurance Plan, so that all POTW sampling
personnel are familiar with the proper sampling procedures. Quality assurance checks will help the
inspector determine when sample collection techniques are inadequate for the intended use of the data. In
addition to the general plan components discussed in Section 3.4, the POTW's Sampling and Quality
Assurance Plan should also contain these field QA elements which sampling technicians should
understand and apply:
•	The required analytical methodology for each regulated pollutant; special sample handling
procedures; and the precision, accuracy, and detection limits of all required analytical methods.
•	The basis for selecting the sampling and analytical methods. For example, each analytical
method should consist of approved procedures. Where the method does not exist, the Sampling
and Quality Assurance Plan should state how the new method will be documented, justified,
and approved for use.
•	The number of analyses for QC (e.g., the percentage of spikes, blanks, or duplicates), expressed
as a percentage of the overall analyses, (e.g., 10 percent (one duplicate sample per 10 samples))
to assess data validity. Generally, the QA program should be approximately 15 percent of the
overall program, with 10 percent and 5 percent assigned to laboratory QC and field QC
respectively. The Sampling and Quality Assurance Plan should include shifting these
allocations or decreasing these allocations depending on the degree of confidence established
for collected data.
•	Frequency and procedures to calibrate and maintain field instruments and automatic samplers.
•	A performance evaluation system that addresses the following areas:
-	Qualifications of personnel for a particular sampling situation.
-	Determining the best representative sampling site.
Sampling techniques (including the location of sampling points within the wastestream,
the choice of grab or composite samples, the type of automatic sampler, special handling
procedures, sample preservation procedures, and sample identification).
-	Flow measurement, where applicable.
63

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
-	Completeness of data, data records, processing, and reporting.
-	Calibration and maintenance of field instruments and equipment.
-	Use of QC samples, such as field duplicates, or splits to assess the validity of the data.
-	Training of all personnel involved in any function affecting data quality.
By following these QA procedures, the inspector or sampling personnel can ensure that proper quality
data is obtained during compliance sampling.
3.5.2 Quality Control Procedures for Sampling
Sampling QC begins with calibration and preventative maintenance procedures for sampling equipment.
The POTW's Sampling and Quality Assurance Plan should include a calibration plan and documentation
record for all field sampling and analysis equipment used. A complete document record should be kept in
a QC logbook, including equipment specifications, calibration date, and calibration expiration data, and
maintenance due date. The person sampling should keep in mind that field analytical equipment should be
recalibrated in the field prior to taking the sample. Personnel conducting sampling should be well-trained
in the use, cleaning, calibration, and maintenance of all instruments or samplers used. Automatic sampler
tubing, bottles, and the sampler itself should be cleaned prior to each sampling event. Automatic samplers
should be calibrated for sample quantity, line purge, and the timing factor, if applicable. This calibration
should be checked in the field to verify draw. The manufacturer's directions should be reviewed and
followed for cleaning and calibrating all equipment.
In addition to calibration procedures, the person conducting field sampling should conduct control checks
during the actual sample collection to assess the performance of sample collection techniques. In general,
the most common monitoring errors usually are improper sampling methodology, improper preservation,
inadequate mixing during compositing and splitting, and excessive sample holding time. In addition, the
inspector or sampling personnel should collect and analyze the following QC samples to check sample
collection techniques:
Blanks
•	Trip Blank. This is a sample vial(s) filled at the laboratory with analyte free deionized water.
The blank(s) follows the same handling and transport procedures as the samples collected
during the event. The blank(s) functions as a check on sample contamination originating from
sample transport, shipping and from site conditions. Note: Expose the trip blank vial(s), to the
same environmental conditions (e.g., light or temperature) as the sample vial(s) but do not open
until it is time for analysis.
•	Field Blank/Field Reagent Blank. These are similar to the trip blanks except they are prepared
in the field with analyte free deionized water exactly as the sample(s) that are collected. Field
blanks are used to check for analytical artifacts and/or background introduced by sampling and
analytical procedures.
•	Equipment/Rinsate Blank. Collect a blank when using an automatic sampler or other non-
dedicated equipment during the sampling process. The blank is a check of the equipment
cleanliness. For automatic samplers, prepare blanks prior to collecting samples, by pumping
deionized water that is free of organics and other analytes, through the sampler and collecting
the discharge purge water in a sample container for analysis for the constituents of concern.
Field Duplicate. This is a precision check on sampling equipment and sampling technique. At selected
stations on a random time frame, duplicate samples are collected from two sets of field equipment
installed at the site, or duplicate grab samples are collected from a single piece of equipment at the site.
64

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Duplicate samples check analytical precision as well as evaluate the "representativeness" of the sample
aliquot.
Split Samples. These are samples that have been divided into two containers for analysis by separate
laboratories. These samples provide an excellent means of identifying discrepancies in the industrial
users' (or their contracted laboratory) analytical techniques and procedures. When filling split samples
from a single composite jug, shake the composited sample well and half fill the sample container, then
shake the composite again and fill half of the permittee's container. Repeat the procedure for each sample
collected for a specific parameter or location of interest. Sometimes a sample is split between the
industrial user and the POTW, both of whom sends their split of the sample to a separate laboratory for
analysis. Please note that oil and grease samples cannot be split due to the nature of the pollutant.
3.5.3 Laboratory Quality Assurance/Quality Control
Laboratory QA/QC procedures ensure correct and representative analyses through instrument calibration
and the processing of control samples. The precision of laboratory findings refers to the reproducibility of
results. In a laboratory QC program, a sample is analyzed independently (more than once) using the same
methods and set of conditions. Precision is estimated by comparing the measurements. Accuracy refers to
the degree of difference between observed values and known or actual values. The accuracy of a method
may be determined by analyses of samples to which known amounts of a reference standard have been
added.
Laboratory QA/QC procedures can be quite complex. Often, the analytical methods specify QA/QC
requirements for calibration, interference checks (for inductively coupled plasma mass spectrometry
(ICP) analyses), control samples, spiking (including the method of standard additions), blank contaminant
level, and instrument tuning. Accuracy is normally determined through the analysis of blanks, standards,
blank spikes, laboratory control samples, and spiked samples. Precision is determined through the
comparison of duplicate results or duplicate spiked results for organic analysis. For more information on
laboratory QA/QC, the POTW should contact their quality assurance manager or Approval Authority.
The methods used by in-house or contract laboratories to analyze industrial user samples must be methods
that are EPA-approved under 40 CFR part 136 and thus are acceptable to a court of law as the most
reliable and accurate methods of analyzing water and wastewater. Although some field test kits are useful
as indicators of current conditions (and, thus, may be used for process control considerations), they are
not appropriate for sampling that is conducted to verify or determine compliance. If non EPA-approved
methods are used for analysis, the data will not be considered admissible as evidence of noncompliance.
When choosing a contract laboratory, POTWs should consult their state's accredited laboratory standards,
when applicable, or obtain and review a copy of the laboratory's QA/QC plan. For more information on
laboratory considerations the POTW should see the EPA's Guidance Manual for POTW Pretreatment
Program Development (October, 1983).
The laboratories performing the sample analyses should use the following control measures as part of
their QA/QC Plan:
•	Prep/Reagent Blank. A sample consisting of reagent(s), without the target analyte or sample
matrix, introduced into the analytical procedure at the appropriate point and carried through all
subsequent steps to determine the contribution of the reagents and/or the contribution of the
analytical steps to any error in the observed value.
•	Quality Control Sample. This is an uncontaminated sample matrix spiked with known
amounts of analytes from a source independent from the calibration standards. Use this sample
to establish intra-laboratory or analyst-specific precision and bias or to assess the performance
of all or a portion of the measurements' system.
65

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
•	Matrix Spike (MS) and Matrix Spike Duplicate (MSP). Two aliquots of an environmental
sample to which known quantities of the analytes of interest and surrogates (if applicable) are
added in the laboratory. The MS/MSD are prepared and analyzed exactly like a field sample.
Their purpose is to quantify any additional bias and imprecision caused by the sample matrix.
The background concentrations of the analytes in the sample matrix must be determined in a
separate aliquot and the measured values in the MS/MSD corrected for background
concentrations.
-	Use an MS to verify accuracy of the analytical procedures.
-	An MSD is a duplicate of an MS sample. It measures the precision of the analysis in
terms of relative percent difference.
•	Laboratory Duplicate. This is a sample that is received by the laboratory and then
subsequently divided into two or more portions. Each portion is separately and identically
prepared and analyzed. The results from laboratory duplicate samples check the laboratory
precision.
3.6 Field Prepara tion A ctivities
The success of each sampling task depends on adequate preparation. Pre-sampling activities include
identifying and collecting necessary equipment, selecting proper sampling containers, cleaning containers
and sampling equipment, and preparing field equipment. Inspection personnel should follow the
Sampling and Quality Assurance Plan when conducting on-site sampling. Inspection personnel should be
briefed, as well, on all field procedures, particularly safety requirements. The inspector should make sure
that the appropriate sampling equipment is available and in good working order. When sample analyses
are to be performed in the field (e.g., pH), the necessary instruments should also be included. Equipment
must be checked prior to going into the field to ensure accurate operation and calibration. In addition, a
review of necessary safety equipment, including PPE should be made and the inspector should be aware
of any potential hazards at the facility.
3.6.1	Checklist of Field Sampling Equipment
A checklist of field sampling equipment should be used to ensure proper preparation (see example
checklist in Appendix K). When the type of waste to be sampled is known ahead of time, the list can be
narrowed to the actual equipment necessary for the specific sampling required.
3.6.2	Selection of Sample Containers
The selection of sample containers must be made prior to going out into the field. It is essential that the
sample containers be made of chemically resistant material unaffected by the concentrations of the
pollutants measured. In addition, sample containers must have a closure that will protect the sample from
contamination. Wastewater samples for chemical analysis must be collected in plastic (polyethylene)
containers. Exceptions to this general rule are samples of oil and grease, pesticides, phenols,
polychlorinated biphenyls (PCBs), and other organic pollutants. Collect these in properly cleaned glass
jars or bottles and properly seal them. Collect bacteriological samples in properly sterilized plastic or
glass containers. Collect samples that contain constituents that will oxidize when exposed to sunlight
(such as iron cyanide complexes) in dark containers. Sample collection containers, preservation
techniques and holding times must comply with the requirements in 40 CFR part 136 Table II and its
footnotes, see Table II - Required Containers, Preservation Techniques, Holding Times at
http: //www. ecfr. gov/cgi-bin/text-
idx?SID=5dlla60e659eaac007bb4dc4917ae3fd&mc=true&node=se40.23.136 13&rgn=div8.
66

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
For automatic samplers, containers with wide mouths are recommended to facilitate the transfer of the
liquid from the sampler to the sample container. In addition, the container must be large enough to
contain the required volume for laboratory analysis.
Container lids and closure linings must be intact and of the right material so they do not interfere with the
pollutant parameters to be measured. Most containers have tight, screw-type lids. Plastic containers are
usually provided with screw caps made of the same material as the container, so cap liners are usually not
required. Glass containers usually come with rigid plastic screw caps. Liner materials may be
polyethylene, polypropylene, neoprene, aluminum foil, or Teflon.
3.6.3 Cleaning and Preparation of Sampling Equipment
It is very important that sample containers are properly cleaned to ensure freedom from contamination.
Sampling equipment must be demonstrated to be free from contamination through the analysis of
equipment blanks and bottle blanks. Many vendors now sell precleaned sample bottles with varied
cleaning specifications. It is recommended that the laboratory perform analysis on a bottle blank when
analyzing the samples to verify that the bottles are not a source of sample contamination. One bottle blank
is recommended per lot number.23
The cleaning and preparation methods for sampling equipment will vary depending on the parameters
being sampled. For example, 40 CFR part 136, Appendix C, Section 8.1 (Inductively Coupled Plasma -
Atomic Emission Spectrometric Method for Trace Element Analysis Method 200.7) describes the
cleaning procedures for metals sampling as summarized in Table 3-1. It should be noted that more
stringent procedures apply when conducting very low level analyses of mercury and other metals. Refer
to EPA method 1669 as a resource for clean sampling techniques, which may be important. Other
procedures will apply to the analyses of organics which may be referenced in specific test methods.
Table 3-1
Metals Cleaning Procedures
Use the following procedures when cleaning sample bottles and/or
vessels for metal sampling and analysis:
1)
Detergent wash.
2)
Tap water rinses.
3)
(1:1) Nitric Acid rinse.
4)
Tap water rinses.
5)
(1:1) Hydrochloric acid rinse.
6)
Tap water rinses.
7)
Deionized distilled water rinses.
(Current as of July 2013)
Automatic sampling equipment must also be cleaned. If automatic sampling equipment does not perform
sel-cleaning all tubing and other sampling system parts must be scrubbed with hot water and detergent,
rinsed several times with tap water, and then rinsed with distilled or deionized water. Further rinsing with
acetone is advised only when the type of tubing (e.g., Teflon) is not susceptible to dissolution by the
solvent. In most cases, the container should be rinsed three times with the wastewater to be sampled
before the sample is taken.24 However, some sample containers, such as those used for bacteriological
sampling, require special cleaning procedures. Bacteriological sample containers must be sterilized prior
23	A lot number is an identification number assigned to a particular quantity or lot of material from a single
manufacturer.
24	Except when sampling for oil and grease, volatile organic compounds, and coliform bacteria. In these
situations, the sample container should not be rinsed with the wastewater prior to sampling.
67

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
to sample collection. The inspector should refer to Standard Methods for the Examination of Water and
Wastewater and 40 CFR part 136 for proper procedures on sample container preparation.
3.6.4 Preparing Field Instruments
The most common parameters tested in the field are: pH, residual chlorine, temperature, and dissolved
oxygen. For these four parameters, 40 CFR part 136 states that they must be analyzed immediately. The
term "analyze immediately" means that a sample taken for the parameter should be analyzed within 15
minutes of sampling. Samples collected for measurement of these analytical parameters cannot be
preserved and therefore, must be analyzed in the field. The electronic and photometric instruments used to
monitor these different parameters should be checked for proper operation prior to leaving the office. The
instruments should be in good condition, have charged batteries, and be calibrated. Best management
practices indicate that recalibrating the instrument at the sampling location is optimal. Inspectors must use
40 CFR part 136-approved methods and should follow manufacturer's specifications for calibration.
3.7 On-Site A ctivities
Once a sampling plan has been established and pre-inspection activities have been completed, the focus of
the inspection turns to the on-site activities performed by the inspector. This section outlines the
procedures that POTW inspectors should follow when conducting on-site sampling at industrial users.
The first thing POTW inspectors should do is conduct an opening conference with the industrial user
representatives. However, when there are suspected violations, the sampling personnel may want to
proceed immediately with sampling and then conduct a closing conference after sampling is completed.
3.7.1 Sampling Location
The first step in preparing to sample is to verify that the sample location is appropriate. The industrial
user permit must specify the sampling location for compliance sampling (40 CFR 403.8(f)(l)(iii)(B)(4)).
Sampling points should be located where there is no discharge other than the discharge from the industrial
user process effluent being monitored. This sampling location must be representative of the actual
discharge from the facility. A representative sampling location is where a sample can be obtained that is
as close as possible to the same composition as that in the larger volume of wastewater being discharged
and is typical of the discharge from the facility on a normal operating day. Convenience, accessibility and
safety are important considerations, but are secondary to the representativeness of the sample. The most
representative samples will be drawn from a wastewater depth where the flow is turbulent and well mixed
and the chance of solids settling is minimal. The depth of sample collection should be 40 to 60 percent of
the wastestreams depth. To avoid contamination, the inspector should take care to collect samples from
the center of the flow with the opening of the sampling device or container facing upstream. Wide
channels or paths of flow may require dye testing to determine the most representative sampling site. If
dye testing is inconclusive, multiple samples may need to be collected by cross sectional sampling.
The inspector should use the sampling location specified in the industrial user's permit. If the sample
location specified in the permit is not adequate to collect a representative sample, the inspector should
determine an alternative location. This determination should be based on the inspector's knowledge of the
plant itself, the production processes, and the outfalls. If there is a conflict between the sample location
described in the permit and the location the inspector believes is most representative, samples should be
collected at both sites. The reason for the conflict should be thoroughly documented for later resolution
by the POTW. If necessary, the permit or other control mechanism must be amended to reflect the more
representative sampling location(s).
The Clean Water Act (CWA) federal categorical standards apply at the end-of-process (or at the end of
treatment, if treatment exists) unless the standard specifies a different location to collect the sample (e.g.,
in 40 CFR part 433, metal finishing, the sample location for cyanide is after the cyanide destruct system
68

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
prior to dilution with other streams). If process effluent is mixed prior to treatment with unregulated
wastestreams or dilution water, the CWF25 must be used (40 CFR 403.6). In this case, the POTW will
designate, in the industrial user's permit or other control mechanism, where the sampling point(s) will be
(end-of-pipe, end-of-process, or both). The POTW must ensure that any change in the industrial user's
sampling point(s) will not allow the user to substitute dilution for adequate treatment to achieve
compliance with applicable standards. Where a treated, regulated, process, wastestream is combined prior
to treatment with wastewaters other than those generated by the regulated process, the industrial user may
monitor either the segregated process wastestream or the combined wastestream for the purpose of
determining compliance with applicable pretreatment standards.
3.7.2 Type of Sample
There are two basic types of samples: grab samples and composite samples. The type of sampling that
will be undertaken at the industrial user must be understood clearly and should be outlined in the POTW's
Sampling and Quality Assurance Plan. It is very important that the POTW establish specific procedures
for collecting grab and/or composite samples. According to 40 CFR 403.12(g)(3), grab samples must be
used for pH, cyanide, total phenols, oil and grease, sulfides, and volatile organic compounds. For all other
pollutants, 24-hour composite samples must be obtained through flow-proportional composite sampling
techniques, unless time-proportional composite sampling or grab sampling is authorized by the POTW.
Where time-proportional composite sampling or grab sampling is authorized by the POTW, the samples
must be representative of the discharge and the decision to allow the alternative sampling must be
documented in the file for that facility or in any control mechanism.
The correct sample type for each regulated parameter must be included in the industrial user's permit or
control mechanism and for compliance determination purposes the inspector must collect the specified
type of sample. Any problems noted with the type of sample specified in the industrial user's permit or
the control mechanism should be documented. If necessary, the permit or other control mechanism may
need to be revised or amended.
3.1.2.1 Grab Samples
A grab sample is an individual sample collected over a period of time not to exceed 15 minutes. Grab
samples are usually taken manually, and the sample volume depends on the number of analyses to be
performed. The sampler must make sure that sufficient volume of sample is taken to conduct all necessary
analytical procedures, including QA/QC. Grab samples represent the conditions that exist at the moment
the sample is taken and do not necessarily represent conditions at any other time. Grab sampling is the
appropriate method of sampling under the following conditions:
•	40 CFR 403.12(g)(3) requires grab samples for pH, cyanide, total phenols, oil and grease,
sulfides, and volatile organic compounds.
•	When the effluent is not discharged on a continuous basis (i.e., batch discharges of an hour or
less), and only when the batch is continuously stirred or well-mixed and the pollutant can be
safely assumed to be uniformly dispersed.
•	When sampling a facility where a statistical relationship can be established between previous
grab samples and composite data.
•	When the effluent is being screened to see if a parameter is present (NOTE: This is only true
when the sample is well-mixed and representative of the discharge).
25 Also refer to EPA's Guidance Manual for the Use of Production-Based Pretreatment Standards and the
Combined Wastestream Formula (September 1985) for more information on using the CWF.
69

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
•	When the waste conditions are relatively constant (i.e., are well-mixed and homogeneous) over
the period of the discharge. In lieu of complex sampling activities, a grab sample provides a
simple and accurate method of establishing waste characteristics.
•	When a POTW or state has adopted an instantaneous local limit which is based on grab
samples.
•	Grab samples are useful in characterizing an industrial user's fluctuations or extremes in
wastewater flow and quality (i.e., changes in pollutant concentrations or loadings) and,
therefore, are useful in identifying slug loads.
For additional guidance on when it is appropriate to use grab samples for determining compliance see the
EPA memorandum, "The Use of Grab Samples to Detect Violations of Pretreatment Standards" at
http://www.epa.gov/npdes/pubs/pretreatment memo grabsamplesdetectviolations.pdf.
3.7.2.2 Composite Samples
Composite samples are samples collected over time, either continuous sampling or by mixing discrete
samples. Composite samples represent the average characteristics of the wastestream during the
compositing period. Composite samples are collected when:
•	Average pollutant concentration during the compositing period is desired.
•	Mass per unit time loadings are calculated.
•	Wastewater characteristics are highly variable.
The primary methods of composite sample collection are time compositing and flow proportion
compositing. The permit may specify which type of composite sample to use. Composite samples are
collected either manually by combining multiple grab samples of by using automatic sampling
equipment. Inspectors should consider variability in wastestream flow rate, parameter concentrations and
approved EPA methods when choosing compositing methods, sampling equipment, and QA procedures.
The compositing methods, all of which depend on either continuous or periodic sampling, are described
below:
•	Time-Proportional Composite Sampling: Composed of constant volume discrete sample
aliquots collected at constant time intervals. This method provides representative samples when
the flow of the sampled stream is relatively constant (i.e., when the flow does not vary by more
than 10 percent of the average flow rate over time).
•	Flow-Proportional Composite Sampling: There are two methods used to collect a flow-
proportional composite sample.
-	In the first method, the time between samples is constant, and the volume of each sample
is proportional to the flow at that given moment in time (i.e., the volume of the sample
varies overtime as the flow changes). This is the preferred method of sampling when
taking a manually composited sample. This method requires that discrete samples be
collected over the operating day and then be manually composited. It is crucial, when
using this method, to have accurate flow data continuously recorded during the sampling
period.
-	The second flow-proportional sampling method involves collecting a constant sample
volume for each volume of wastestream flow (e.g., 200 milliliter (mL) sample collected
for every 5,000 gallons of flow) at time intervals inversely proportional to the stream
flow. This is the preferred method when taking composite samples using an automatic
sampler. This method is based on taking a sample after a set amount of wastewater has
70

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
been discharged. This method provides representative samples of all wastestreams when
the flow is measured accurately. A composite sample should be collected over a
workday. If a facility operates and discharges 24 hours per day, then the composite
sample should be taken as a 24-hour composite (either flow proportional or time
composite). If a facility operates 24 hours per day but only discharges wastewater for six
hours, a six-hour composite sample should be collected. In general, composite samples
should be collected to assess compliance with categorical standards and local limits, as
long as the limits are daily, weekly, or monthly averages, except for those parameters
listed above that must be taken by grab sample. If the POTW is using an automatic
sampler with discrete sample containers, the inspector should keep track of any sample
bottles that are empty and seek an explanation from the industrial user for all empty
sample bottles from the automatic composite sampler.
Table 3-2 lists the advantages and disadvantages of each composite sampling method. Either manual or
automatic sampling techniques can be used. If a sample is composited manually, sample manipulation
should be minimized to reduce the possibility of contamination. The inspector must use the sampling
method specified in the permit or other control mechanism, which in turn must reflect the requirements at
40 CFR 403.12(g)(3).
Table 3-2
Composite Sampling Methods
Method
Advantages
Disadvantages
Comments
Time-Proportional Composite
Constant sample volume, constant
time interval between samples.
Minimal instrumentation
and manual effort.
Requires no flow
measurement.
May lack
representativeness
especially for highly
variable flows.
Widely used in both
automatic samplers and
manual handling.
Flow-Proportional Composite
•	Constant sample volume,
time interval between
samples proportional to
stream flow.
•	Constant time interval
between samples, sample
volume proportional to total
stream flow at time of
sampling.
Minimal manual effort.
Minimal instrumentation.
Requires accurate flow
measurement reading
equipment.
Samples must be manually
composited. Discrete
samples must be taken.
Chance of collecting
samples that are too small
or too large for a given
composite volume.
Widely used in automatic
as well as manual
sampling.
Used in automatic
samplers and widely used
as manual method.
3.7.2.3 Compositing Grab Samples
As stated earlier, some pollutant parameters must be collected as grab samples, but may be composited, if
specific sampling/preservation techniques for each parameter are followed. If the POTW will composite
the grab samples, it must26 follow the procedures presented in 40 CFR part 136 or Standard Methods for
the Examination of Water and Wastewater. As stated at 40 CFR 403.12(g)(3) multiple grab samples
collected during a 24-hour period may be composited prior to analysis as follows: for cyanide, total
26 Footnotes 2, 4, 6 and 7 of Table II at 40 CFR 136 contain information regarding requirements for collection,
preservation and analysis of grab samples.
71

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
phenols, and sulfides, the samples may be composited in the laboratory or in the field; for volatile
organics and oil and grease the samples may be composited in the laboratory. Composite samples for
other parameters may be authorized by the POTW, as appropriate, as long as approved EPA
methodologies in 40 CFRpart 136 are used.
Oil and Grease
The currently approved methods for measurement of oil and grease listed at 40 CFR part 136 are EPA
Method 1664, Revisions A and B and Standard Method 5520 B-2001. Standard Method 5520 B-2011 has
been proposed for approval at 40 CFR part 136 as part of the Feb. 19, 2015, Methods Update Rule
(MUR). All samples must be acidified and/or verified in the lab to pH < 2 immediately prior to analysis.
If analysis is to be delayed for more than four hours, adjust the sample pH to less than two with
hydrochloric acid (HC1) or sulfuric acid (H2SO4) solution (Section 7.2) at the time of collection and
refrigerate at 0-6 0 C (40 CFR part 136, Table III). To establish the volume of HC1 or H2SO4 required,
collect a separate aliquot, adjust the pH of this aliquot to less than 2 with acid, and add the volume of acid
determined to each sample bottle prior to collection. During the sample collection, do not dip pH paper, a
pH electrode, a stirring rod, or other materials into a sample that will be used for Hexane Extractable
Material (HEM) or Silica Gel Treated Hexane Extractable Material (SGT-HEM) determination because
substance in the ample may adhere to these items. EPA Method 1664 Revisions A and B contain
procedures for compositing samples collected for measurement of oil and grease in the laboratory prior to
analysis. These procedures are detailed in Section 8 - Sample Collection, Preservation and Storage in
each of the methods (see Oil & Grease: https://www.epa.gov/cwa-methods/cwa-methods-regulatorv-
history).
The high probability that extractable matter may adhere to sampling equipment and result in
measurements that are biased low precludes the collection of composite samples for determination of oil
and grease. Therefore, samples must be collected as grab samples. If a composite measurement is
required, individual grab samples collected at prescribed time intervals must be analyzed separately and
the concentrations averaged. Alternatively, samples can be collected in the field and composited in the
laboratory. For example, collect four individual 250-mL samples over the course of a day. In the
laboratory, pour each 250-mL sample into the separatory funnel, rinse each of the four bottles (and caps)
sequentially with 30 mL of n-hexane, and use the 30 mL of n-hexane for the extraction.
Cyanide (Total)
The following methods are approved at 40 CFR part 136 at 4500-CN C, D, E and F-2011 and from
Standard Methods for the Examination of Water and Wastewater. They are Standard methods not EPA
Methods. EPA Method 335.4, Rev 1.0 is also approved at 40 CFRpart 136 for measurement of total
cyanide. Additionally, updated guidance on sample collection, preservation and interference mitigation
for samples to be measured for total cyanide is provided in footnotes 5 and 6 to Table II at 40 CFR 136.3.
These updated procedures are located at http://www.ecfr.gov/cgi-bin/text-
idx?SID=a21b2873e4cffda2da79b7a04570c2a8&mc=true&node=se40.25.136 13&rgn=div8.
NOTE: Any technique for removal or suppression of interference may be employed, provided the
laboratory demonstrates that it more accurately measures cyanide through QC measures described in the
analytical test method. Any removal or suppression technique not described in D7365-09a or the
analytical test method must be documented along with supporting data.
3.7.3 General Sample Collection Techniques
To obtain a representative sample, sampling must be conducted where wastewater is adequately mixed.
Ideally, a sample should be taken in the center of the flow where the velocity is highest and there is little
possibility of solids settling. The inspector should avoid skimming the surface of the wastestream or
dragging the channel bottom. Mixing of the flow is particularly important for ensuring uniformity.
72

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Sampling personnel should be cautious when collecting samples near a weir because solids tend to collect
upstream and floating oil and grease accumulate downstream of the weir.
Samples can be collected either manually or with automatic samplers. The following general guidelines
apply when collecting samples:
•	Take samples at the site specified in the industrial user permit or the control mechanism. If the
inspector determines that the site specified in the permit is not appropriate, he or she should
sample at a location that yields a more representative sample and document where the sample
was taken and why it was taken there. If the sample site is determined to be inappropriate,
appropriate modifications to the permit must be made.
•	Use the sampling method (grab or composite) required by the industrial user permit or other
control mechanism. If the permit sampling method is inappropriate (e.g., if it calls for
composite sampling for pH), then the inspector should note this in the field notebook and take
two samples: one using the permit method and one using the method under 40 CFR
403.12(g)(3). The inspector should document how the samples were collected and why the
permit method may not be representative. The permit should be modified, if appropriate.
•	Samples of certain pollutant parameters may not be taken by automatic samplers, but must be
taken by manual grab samples. Federal regulations at 40 CFR 403.12(g)(3) require that grab
samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile
organic compounds.
•	Temperature and pH both must be analyzed within 15 minutes of sampling in accordance with
40 CFR part 136.
•	Avoid collecting large nonhomogeneous particles and objects.
•	Collect the sample facing upstream to avoid contamination.
•	Do not rinse the sample container with the effluent when collecting oil and grease and
microbiological samples, but fill the container directly to within 2.5 to 5 cm from the top.
•	Fill the container completely if the sample is to be analyzed for purgeable organics, dissolved
oxygen, ammonia, hydrogen sulfide, free chlorine, pH, hardness, sulfite, ammonium, ferrous
iron, acidity, or alkalinity.
•	Collect sufficient sample volume to allow for QA testing. (NOTE: Table 3-3 provides a guide
to numerous sample volume requirements but additional volume may be necessary for QA
testing).
When taking a grab sample, the entire mouth of the container should be submerged below the surface of
the wastestream. A wide mouth bottle with an opening of at least two inches is recommended for this type
of sampling. When using a composite sampler, the sample line should be kept as short as possible and
sharp bends, kinks, and twists in the line (where solids can settle) should be avoided. The sample line
should be placed so that changes in flow will not affect sample collection. Sample collection procedures
should also include collection of the appropriate QC samples as discussed in section 3.5.2.
Sometimes grab samples must be taken from holding tanks with contents that will be released as a batch
discharge. If this wastewater contains settleable solids, a grab sample from such a tank will only be
representative if the contents are mixed at the time of the grab. The agitation must be enough to suspend
all of the solids that are present.
There are a number of mixing methods to consider. The effectiveness of each is dependent on the
material being mixed, the size and shape of the tank, the sizing of the equipment, the amount of time
73

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
allowed for mixing, and, for some, the technique used. In other words, an engineer would be needed to
determine the requirements. Whatever method is selected, it would need to be in active use when
sampling is done.
Depending on the material being mixed, there are at least two other considerations when selecting a
mixing technology.
1.	Some methods are more likely than others to cause the tank contents to foam.
2.	Some methods are more likely than others to cause out-gassing of volatile and semi-volatile
compounds.
Mixing methods include:
1.	Commercial mixer/agitator. These utilize various technologies including:
A.	Propeller
B.	Reciprocating disk
C.	Recirculating jet sprayer.
2.	Use a submersible discharge pump powerful enough, and with a discharge line flexible enough,
so that the discharge can be directed to, and reach, the full area of the tank floor. This would be
duplicating the effect of step l.C.
3.	Use a pumper truck to recirculate the contents of the tank. This would also be duplicating the
effect of step l.C.
4.	When there is only a slight difference in density between the settable solids and supernatant, a
sludge judge "core sample" may be representative.
5.	A tank with multiple sample ports at different depths might be able to produce a representative
composite sample. As with the sludge judge, this will not be effective if there are very dense
solids that have settled to the bottom.
6.	If one holding tank is to be emptied into another, a composite sampler could be used on the
flow as it is being transferred to obtain a representative sample.
An EPA guidance (excerpt below) for obtaining representative subsamples when particulates are present
states that mixing cannot be relied upon to produce representative grab samples (because settling begins
as soon as mixing has stopped).
From EPA Guidance for Obtaining Representative Laboratory Analytical Subsamples from Particulate
Laboratory Samples:
"Many analysts rely on mixing (or blending) as a preliminary "homogenization" step before
taking a grab sample. Unfortunately, many samples cannot be made homogeneous enough for
sampling by mixing, and such a procedure should not be relied upon to reduce GE. Segregation of
particles by gravitational effects usually occurs at the moment that the mixing has stopped. Some
samples will remain segregated even during the mixing process. Even if the mixing was effective,
the subsampling step will still involve the same minimum error contributions from the
fundamental error and the grouping error due to the random placement of analyte particles within
the sample. The incorrect nature of grab sampling exacerbates the uncertainty by maximizing the
error components from grouping, segregation, delimitation, and extraction processes. Grab
sampling has been shown to be an unacceptable sampling method and should not be used with
particulate samples (Allen & Khan, 1970; and Gerlach et al., 2002)."
74

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
"When collecting samples from a tank, the tank contents must be well mixed. It is recommended
that three samples are collected with each sample event. One sample should be collected at the
inlet of the tank, one mid way in the tank volume, and one near the discharge point of the
tank. Even if the tank is not getting good mixing, the collection of three samples should allow
representative sample collection."
3.7.4 Sample Volume
The volume of samples collected depends on the type and number of analyses needed. This will be
determined by the parameters to be measured and the requirements of the analytical laboratory being
used. Sample volume must be sufficient for all analyses, including QA/QC and any repeat analyses used
for verification. Laboratory personnel should be contacted for the sample volume required to complete all
analyses, since the laboratory is in the best position to estimate the necessary volume of sample.
Individual, minimum composite portions should be 100 mL, with a total composite volume of 2 to 4
gallons. Larger volumes may be necessary if samples are to be separated into aliquots or if bioassay tests
are to be conducted.
Volume requirements for individual analyses range from 40 mL for pH and volatile organic
determinations to 1,000 mL or more for biochemical oxygen demand (BOD), oil and grease, and
settleable solids. The inspector should always collect more than the minimum sample volume to allow for
spillage and laboratory reruns. A summary of common sample volumes for various pollutant analyses is
provided in Table 3-3.
Table 3-327
Volume of Sample Required for Analyzing Various Industrial Pollutants
Analyte Classes
Volume of Sample1 (mL)
PHYSICAL

Color and Odor2	
Corrosivity2	
Electrical Conductivity2	
pH, electrometric2	
Radioactivity	
Specific gravity2	
Temperature2	
Toxicity2	
Turbidity2 	
	 100 to 500
	 flowing sample
	 100
	 100
	 100 to 1,000
	 100
	 flowing sample
	 1,000 to 20,000
	 100 to 1,000
CHEMICAL

Dissolved Gases:

Ammonia3, NH3	
Carbon Dioxide	
Chlorine3	
Hydrogen3	
Hydrogen Sulfide3	
Oxygen3	
Sulfur dioxide3	
	 500
	 200
	 200
	 1,000
	 500
	 500 to 1,000
	 100
Miscellaneous:

Acidity and alkalinity	
Bacteria, iron	
Bacteria, sulfate reducing	
	 100
	 500
	 100
27 Inspectors should always follow the most up-to-date test methods.
75

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Analyte Classes
Volume of Sample1 (mL)
Biochemical Oxygen Demand (BOD)	
	 100 to 500
Chemical Oxygen Demand (COD)	
	 50 to 100
Chloroform extractable matter	
	 1,000
Detergents	
	 100 to 200
Hardness	
	 50 to 100
Hydrazine	
	 50 to 100
Microorganisms	
	 100 to 200
Volatile and filming amines	
	 500 to 1,000
Oil and Grease	
	 3,000 to 5,000
Organic Nitrogen	
	 500 to 1,000
Phenolic compounds	
	 800 to 4,000
pH, colorimetric	
	 10 to 20
Polyphosphates	
	 100 to 200
Silica	
	 50 to 1,000
Solids, dissolved	
	 100 to 20,000
Solids, suspended	
	 50 to 1,000
Tannin and Lignin	
	 100 to 200
Metals:

(Cations)

Aluminum, Al+++	
	 100 to 1,000
Ammonium3, NH4+	
	 500
Antimony, Sb+++ to Sb+++++	
	 100 to 1,000
Arsenic, As+++ to As+++++	
	 100 to 1,000
Barium, Ba++	
	 100 to 1,000
Cadmium, Cd-	
	 100 to 1,000
Calcium, Ca++	
	 100 to 1,000
Chromium, Cr+++ to Cr++++	
	 100 to 1,000
Copper, Cu++	
	 200 to 4,000
Iron3, Fe++ to Fe+++	
	 100 to 1,000
Magnesium, Mg++	
	 100 to 4,000
Manganese, Mn++ to Mn+++++++	
	 100 to 1,000
Mercury, Hg- to Hg++	
	 100 to 1,000
Potassium, K-	
	 100 to 1,000
Nickel, Ni++	
	 100 to 1,000
Silver, Ag-	
	 100 to 1,000
Sodium, Na+	
	 100 to 1,000
Strontium, Sr-	
	 100 to 1,000
Tin, Sn+++ to Sn++++	
	 100 to 1,000
Zinc, Zn++	
	 100 to 1,000
(Anions)

Bicarbonate, HCO3-	
	 100 to 200
Bromide, Br	
	 100
Carbonate, CO3-	
	 100 to 200
Chlorine, C1	
	 25 to 100
Cyanide, Cn-	
	 25 to 100
Fluoride, Fh	
	 200
Hydroxide, OH-	
	 50 to 100
Iodide, I-	
	 100
Nitrate, NOr	
	 10 to 100
Nitrite, NO2-	
	 50 to 100
Phosphorous, ortho, PO4-, HPO4-, H2 PO4-	
	 50 to 100
Sulfate, SO4", HSO4	
	 100 to 1,000
Sulfide, S-, Hs-	
	 100 to 500
76

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Analyte Classes
Volume of Sample1 (mL)
Sulfite, SO: , HSO:	
	 50 to 100
(Associated Water and Air Resource Engineers, Inc., 1973, Handbook for Monitoring Industrial Wastewater, U.S. EPA
Technology Transfer)
Notes:
1	Volumes specified in this table should be considered as guides for the approximate quantity of sample necessary for a
particular analysis. The exact quantity used should be consistent with the volume prescribed in the standard method of
analysis, whenever a volume is specified.
2	Aliquot may be used for other determinations.
3	Samples for unstable constituents must be obtained in separate containers, preserved as prescribed, completely filled, and
sealed against all exposure.
3.7.5 Sample Preservation and Holding Times
Preservation techniques ensure that the sample remains representative of the wastestream at the time of
collection. Since most pollutants in the samples collected are unstable (at least to some extent), this
instability requires that the sample be analyzed immediately or that it be preserved or fixed to minimize
changes in the pollutant concentration or characteristics between the time of collection and analysis.
Because immediate analysis is not usually possible, most samples are preserved regardless of the time of
analysis. This preservation must take place as soon as possible after collecting the sample. This means
that preservation must take place in the field (see 40 CFR 136.3). The most common procedures used for
preserving samples include icing, refrigeration, pH adjustment, and chemical fixation. When chemical
fixation is used, the chemical preservative must be added before the samples are transferred to the
laboratory. Likewise, refrigeration should be supplied immediately upon taking the sample. For many
samples, if preservation is not appropriately used, bacteria can quickly degrade certain pollutant
constituents (e.g., phenols and phosphorous). Other constituents such as cyanide and sulfides may
volatilize or in the case of hexavalent chromium may react to form different chemical species. Proper
preservation and holding time for each parameter is essential for the integrity of the monitoring program.
Problems may be encountered, however, when 24-hour composite samples are collected. Since sample
deterioration can take place during the compositing process, it is necessary to preserve or stabilize the
samples during the compositing in addition to preserving the aggregate sample before shipment to the
laboratory. Preservation techniques vary depending on the pollutant parameter that is to be measured;
therefore, the inspector must be familiar with the 40 CFR part 136 preservation techniques to ensure
proper sample handling and shipment. It is important to verify that the preservation techniques for one
parameter do not affect the analytical results of another parameter in the same sample. If this is a
possibility, then two discrete samples should be collected and preserved independently. Sample
preservation should be provided during compositing, generally by refrigeration to less than or equal to
6°C (or icing) as required at 40 CFR 136.3 Table II, footnote 2.
Refrigeration is the most widely used preservation technique because it has no detrimental effect on the
sample composition and does not interfere with any analytical methods. Refrigeration suppresses
biological activity and volatilization of dissolving gases and organic substances. This technique is used at
the start of sample collection in the field and during sample shipment, and continued until the sample is
analyzed by the laboratory. Sample temperature should be verified and recorded by the inspector. This is
particularly important if the analytical results are to be used in an enforcement action.
In addition to preservation techniques, 40 CFR part 136 indicates maximum holding times. Times listed
are the maximum times between sample collection and analysis that are allowed for the sample to be
considered valid. Some parameters have separate holding times from the time of sample collection to
extraction/preparation, and from extraction/preparation to analysis. A composite wastewater sample
becomes a sample when the last aliquot is collected. A grab sample holding time begins when the sample
77

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
is collected. At that point, holding time limitations begin. A list of preservation methods and holding
times appears in Table II of 40 CFR 136.3. Inspectors should consult 40 CFRpart 136 for the most
current and detailed specifications. These sample preservation procedures and holding times were
selected by the EPA because they retard sample degradation and minimize monitoring costs by extending
holding times as long as possible.
3.7.6 Sample Documentation
Documentation is an integral part of any pretreatment program. The validity of the samples collected and
the data obtained both in the field (e.g., pH and flow) and in the laboratory (i.e., chemical analyses) is
ensured through documentation and record keeping. All the information documented must be complete
and accurate. Failure to maintain records and documentation according to set procedures could result in
these documents being deemed inadmissible as evidence in court. All field records containing data must
be signed by the inspector at the time of collection, including all COC forms.
3.1.6.1 General Documentation Procedures
Since many sampling reports may be used in enforcement proceedings, the inspector must keep a precise
record of all sample collection and data handling. The POTW's Sampling and Quality Assurance Plan
should specify that the following information must be documented in the field record:
•	Unique Sample or Log Number: All samples should be assigned a unique identification
number. If there is a serial number on the transportation case, the inspector should add this
number to their field records.
•	Date and Time of Sample Collection: The date and time of sample collection must be
recorded. In the case of composite samples, the sequence of times and aliquot size should be
noted.
•	Source of Sample (Facility Name and Address): The name and address of the facility being
sampled shall be recorded as well as a narrative description and/or diagram referring to the
particular site where the sample was taken.
•	Name of Sampling Personnel: The name(s) and person(s) taking the sample should be
indicated. For a composite sample, the name(s) of the person(s) installing the sampler and the
name(s) of the person(s) retrieving the sample should be included.
•	Sample Type: Each sample should indicate whether it is a grab or composite sample. If the
sample is a composite, volume, and frequency of individual samples should be noted.
•	Preservation Method: Any preservatives (including the amount) added to the sample should
be recorded, including the preservative amount and the method of preservation (e.g.,
refrigeration).
•	Analysis Required: All parameters for which the sample should be analyzed shall be specified.
•	Field Analysis: Field measurements must be recorded at the time that the analysis is
completed. Examples of analyses that should be conducted and recorded in the field include:
pH, temperature, dissolved oxygen, residual chlorine, and sulfites. Field analyses should be
treated the same as any other sample (i.e., the sampler must record the date of the sample, type
of sample, name of the sampler, chain-of-custody, etc.).
•	Flow: If flow is measured at the time of the sampling, the flow measurement should be
recorded. If the sample is to be used to determine compliance, flow must be measured.
•	Production Rates: Information on products manufactured and production rates should be
included since many effluent limitations are based on production rates.
78

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
•	Date, Time and Documentation of Sample Shipment: The shipment method (e.g., air or rail)
as well as the shipping papers or manifest number should be recorded.
•	Comments: This refers to all relevant information pertaining to the sample or the sampling
site. Such comments include the condition of the sample site, observed characteristics of the
sample, environmental conditions that may affect the sample, and problems encountered in
sampling.
Each of these items should be recorded by the POTW inspector when conducting site sampling, but this
information should also be kept by the industrial user when it conducts its required self-monitoring. This
information should be available for review by the POTW when conducting an on-site inspection or
sampling visit.
3.1.6.2 Chain-of-Custody Procedures
Once an appropriate sample has been obtained and the sample collection methods are properly
documented, a written record of the possession of that sample should be made. "Chain-of-custody" refers
to the documented account of changes in possession that occur for a particular sample or set of samples
(see Definition section for a definition of "custody"). To ensure that all necessary information is
documented, a COC form should be developed by the POTW.
Chain-of-custody procedures are a critical aspect in monitoring industrial users, and these procedures
should be incorporated into the POTW's Sampling and Quality Assurance Plan. The chain-of-custody
record allows an accurate step-by-step recreation of the sample path, from its origin through its final
analysis in the laboratory. Every sample needs to be accompanied by a COC form that is properly signed
and transferred to each person in the chain, from the original sampler to the final person involved in
analyzing the sample. Since it is impossible to predict which violations will require legal action, it should
be assumed that all data generated from sampling will be used in court. If a case ultimately goes to trial,
the integrity of the data must be established. The sampling results will only be admissible in court if
POTW personnel can prove that a sample has been properly collected, preserved, and analyzed, and has
not been tampered with or mishandled.
The information that should be addressed in a COC form includes:
•	Name of the person collecting the sample.
•	Sample identification number(s).
•	Sample location.
•	Date and time of sample collection.
•	Parameters to be analyzed.
•	Container type(s) used.
•	Preservation method(s).
•	Type of sample collected (i.e., grab, composite) for each pollutant to be analyzed.
•	Results of any analysis performed in the field (e.g., pH and temperature).
•	Name(s), signature(s), dates and times of all persons handling the samples in the field and in the
laboratory. Note: Laboratories often have separate chain-of-custody procedures, so the chain-
of-custody used in the field may end once the sample reaches the laboratory.
An example of a COC form used by the EPA is found in Appendix E. All personnel handling the sample
should receive a copy of the COC form showing the path of the sample from field to laboratory. All
79

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
sample shipments must be accompanied by the chain-of-custody record while a copy of these forms
should be retained by the originator. In addition, all receipts associated with the shipment should be
retained. Carriers typically will not sign for samples; therefore, seals must be used to verify that
tampering has not occurred during shipment.
When transferring possession of samples, the transferee must sign and record the date and time on the
chain-of-custody record. In general, custody transfers are made for each sample, although samples may be
transferred as a group, if desired. Each person who takes custody must fill in the appropriate section of the
chain-of-custody record. Finally, the person or group at the POTW responsible for permitting and/or,
compliance and enforcement should receive a copy of the completed COC form.
Chain-of-custody records are crucial if the analytical data are to be used in an enforcement proceeding
because they allow such data to be introduced as evidence without testimony of the persons who made the
record. Therefore, it is important that all chain-of-custody records be complete and accurate. To maintain
the sample's integrity, chain-of-custody records must show that the sample was properly collected,
preserved, and analyzed, and was not tampered with during shipment. Chain-of-custody records also
show that samples were received and analyzed in accordance with method requirements. Therefore, all
compliance samples taken at an industrial user should follow chain-of-custody procedures.
3.7.7	Sample Identification and Labeling
Each sample must be accurately and completely identified. At the time a sample is collected, a
waterproof, gummed label or a waterproof tag that is able to withstand field conditions should be attached
to the sample container. This label and/or tag is necessary to prevent any misidentification of samples,
since it provides the laboratory with relevant information for analysis, such as: the name of the sample
collector, the sample identification number, the date and time of sample collection, the location of the
sample collection, the preservatives used, the type of sample (grab or composite) and the identification of
the parameters to be analyzed. Sample identification, therefore, is a crucial part of chain-of-custody.
Sample tags should be used as part of the chain-of-custody process because they can be removed after the
sample has been transported to the laboratory and placed in the evidence file for that sample while labels
are usually discarded with the sample. The tags can then be used as evidence in an enforcement
proceeding. The sample identification procedures should be incorporated into the POTW's Sampling and
Quality Assurance Plan.
Sample seals or cooler seals (i.e., seals placed around a cooler with similar samples inside) should be used
to protect the sample's integrity from the time it is collected to the time it is opened in the laboratory. The
seal should contain the collector's name, the date and time of sample collection and the sample
identification number. Information on the seal must be identical to the information on the label and tag. In
addition, the seal must be attached so it must be broken to open the sample container or cooler. Caution
should be observed to assure that glue on the sample seals and tag wires does not contaminate samples,
particularly those containing volatile organics and metals.
3.7.8	Sample Packaging and Shipping
After the samples are properly labeled, they should be placed in a transportation case along with the COC
form, pertinent field records, and analysis request forms. Glass bottles should be wrapped in foam rubber,
plastic bubble wrap, or other material to prevent breakage during shipment. The wrapping can be secured
around the bottle with tape. Samples should be placed in ice or a synthetic ice substitute that will maintain
sample temperature at 6°C or below throughout shipment. Ice should be placed in double-wrapped
watertight bags to ensure the water will not drip out of the shipping case. Metal or heavy plastic chests
make good sample transportation cases. Filament tape wrapped around each end of the ice chest ensures
that it will not open during transport. Sampling records should be placed in a waterproof bag, envelope or
airtight sample bottle and taped to the inside lid or other appropriate place inside the transported container
to prevent tampering or breach of custody. Shipping containers should also be sealed to prevent
80

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
tampering. Sample packaging and shipping considerations should be included in the POTW's Sampling
and Quality Assurance Plan (discussed in section 3.4).
Most samples will not require any special transportation precautions except careful packaging to prevent
breakage and/or spillage. If the sample is shipped by common carrier or sent through the U.S. mail, it
must comply with Department of Transportation (DOT) Hazardous Waste Materials Regulations (49 CFR
parts 171-177). Air shipment of hazardous waste materials may also be covered by requirements of the
International Air Transport Association (IATA). Before shipping a sample, the inspector should be aware
of, and follow, any special shipping requirements. Special packaging and shipping rules apply to
substances considered hazardous as defined by IATA rules. Typical wastewater samples are not generally
considered hazardous materials.
3.8 Flow Measurement
Pollutant limits in the industrial user's permit are often expressed in terms of mass loadings to the POTW
(e.g., categorical standards for Organic Chemicals, Plastics, and Synthetic Fibers). To determine a mass
loading it is necessary for the inspector to obtain accurate flow data. This section briefly describes the
types of devices and procedures used to measure flow. For further information, the inspector should
consult the NPDES Compliance Inspection Manual (July, 2004), which is the reference document for the
following sections. In situations where flow measuring devices such as those described in the following
sections are not available, the POTW may need to rely on the use of water consumption records at the
facility. However, when a mass loading needs to be determined for assessing compliance, the POTW
should have the ability to assess directly the flow at the facility during the sampling event.
3.8.1 Open Channel Flow
Open channel flow, where the flow occurs in conduits that are not full of liquid, is the most prevalent type
of flow at industrial user discharge points regulated by the pretreatment program. Partially full pipes that
are not under pressure are classified as open channels as well. Open channel flow is measured using both
primary and secondary devices (as described below).
Primary Devices
Primary devices are calibrated, hydraulic structures installed in the channel so flow measurements can be
obtained by measuring the depth of liquid at a specific point in relationship to the primary device. Weirs
and flumes are examples of primary devices.
The most common type of weir consists of a thin, vertical plate with a sharp crest that is placed in a
stream, channel, or partially filled pipe. Figure 3-1 shows a profile of a sharp-crested weir and indicates
the appropriate nomenclature. Four common types of sharp-crested weirs are shown in Figure 3-2. The
crest is the upper edge of the weir to which water must rise before passing over the structure. The vertical
distance from the crest of the weir to the top of the water surface is termed the "head." To determine flow
rate, the inspector must measure the hydraulic head. The rate of flow over a weir is directly related to the
height of water (hydraulic head) above the crest. To measure the hydraulic head, a measuring device is
placed upstream of the weir at a distance of at least four times the head. To approximate the head, the
inspector can measure at the weir plate. However, this value will provide only a rough estimate of flow.
The flume is an artificial channel constructed so the wastestream flows through it. The wastestreams flow
is proportional to the depth of water in the flume and is calculated by measuring the head. A flume is
composed of three sections: (1) a converging upstream section; (2) a throat or contracted section; and (3) a
diverging or dropping downstream section. The two principal types of flumes are the Parshall Flume and
the Palmer-Bowlus Flume.
Figure 3-3 presents a sketch of the Parshall Flume, identifying its different parts. In the Parshall Flume,
the floor level of the converging section is higher than the floor of the throat and diverging section. The
81

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Flume operates on the principle that when water flows through a constriction in the channel, a hydraulic
head is produced that is proportional to the flow. Flumes are good for measuring open channel waste flow
because they are self-cleaning. Sand and suspended solids are unlikely to affect the device's operation.
A Palmer-Bowlus Flume, which may or may not have a constriction, has a level floor in the throat section
and is placed in a pipe for approximately the length of the pipe's diameter. The depth of water above the
raised step in the throat is related to the discharge rate. The head should be measured at a distance (d/2)
upstream of the throat, where (d) is the width of the flume. The height of the step is usually unknown
until the manufacturer's data are consulted, and it is difficult to measure manually the height of water
above the step at an upstream point. The dimensions of each Palmer-Bowlus Flume are different.
Therefore, the manufacturer's data must be consulted to establish a relationship between the head and the
discharge rate. Figure 3-4 contains a sketch of a free-flowing Palmer-Bowlus Flume.
Figure 3-1
Profile and Nomenclature of Sharp-Crested Weirs
Point to
Measure
Depth, H
Sharp-Crested Weir
Weir Crest
Straight
Inlet Hun
Approx.
'max
Minimum
Discharge
Leve! for
Free Fall
Nappe
Air Gap
Free Fall
82

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Figure 3-2
Four Common Types of Sharp-Crested Weirs
I-
Crest Length
i
r
THX
2 Hmax
Minimum
2 Hmax
Minimum Crest Length

_ 2 Hmax
Minimum
Suppressed {Without End Contractions)
Rectangular Weir
Trapezoidal (Cipolletti) Sharp-Crested Weir
1 Hmax
Minimum Crest Length
	[	
1
Hmax
2 Hmux
Minimum
2 Hmax
Minimum
Hmax
2 Hmax
Minimum
Contracted (With End Contractions)
Rectangular Weir
V-Notch (Triangular) Sharp-Crested Weir
83

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Figure 3-3
Plan View and Cross Section of a Parshall Flume
Ha
Hb
Throat
Section
Flow
Converging
Section
Diverging
Section
Water
Surface
Submerged Flow
Free Flow
_L
0 Level Floor
Zero Reference
Level for H,
and Hh
84

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Figure 3-4
Free-Flowing Palmer-Bowlus Flume
Upper	Lower
Transition	Transition
Flow
Water Surface
Small Jump
Should Occur
in This Region
Throat
Upstream
Depth
Downstream
Depth
Preferred Head
Measuring Point
D = Conduit Diameter
Secondary Devices
Secondary devices are used in conjunction with primary devices to determine the actual flow passing the
measuring point. Typically, secondary devices measure the depth of water in the primary device and
convert the depth measurement to a corresponding flow, using established mathematical formulas. The
output of the secondary device is generally transmitted to a recorder and/or totalizer to provide
instantaneous and historical flow data to the operator. Outputs may also be transmitted to sampling
systems to facilitate flow proportioning. Secondary devices can be organized into two broad categories:
•	A non-recording type with direct readout (e.g., a staff gauge) or indirect readout from fixed
points (e.g., a chain, wire weight, or float) or
•	A recording type with either digital or graphic recorders (e.g., float in well, float in flow,
bubbler, electrical, or acoustic).
3.8.2 Closed Channel Flow
Closed channel flow is normally encountered between treatment units in a wastewater treatment plant and
after lift stations, where liquids and/or sludges are pumped under pressure. It is also encountered in
submerged outfalls. Flow in closed channels is usually measured by a metering device inserted into the
conduit. Examples of closed channel flow measuring devices are the Venturi Meter and the
electromagnetic flow meter.
The Venturi Meter is one of the most accurate primary devices for measuring flow in closed channels. It
is basically a pipe segment consisting of an inlet with a converging section, a throat, and a diverging
outlet section, as illustrated in Figure 3-5. The water velocity is increased in the constricted portion of the
inlet section which results in a decrease in static pressure. The pressure difference between the inlet pipe
and the throat is proportional to the flow.
85

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
Figure 3-5
Configuration and Nomenclature of a Venturi Meter
Throat
Section
Outlet Section
Inlet Section
Pipe
Diameter
5" - 7"
Throat Diameter
Low Pressure Tap
High Pressure
Tap
Electromagnetic flow meter operation is based on the fact that the voltage induced by a conductor moving
at right angles through a magnetic field will be proportional to the velocity of that conductor as it moves
through the field. In the case of the electromagnetic flow meter, the conductor is the stream of water to be
measured, and the magnetic field is produced by a set of electromagnetic coils. A typical electromagnetic
flow meter is shown in Figure 3-6.
Figure 3-6
Electromagnetic Flow Meter
Insulating Liner
Electrode Assembly
Steel Meter Body

©)
Magnet Coils
Potting Compound
86

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
3.8.3 Evaluation of Facility-Installed Flow Devices and Data
For closed-channel flows the facility will usually have a metering device inserted into the conduit that
measures flow. Examples of closed-channel flow measuring devices are the Venturi meter, the Pitot tube,
the paddle wheel, the electromagnetic flowmeter, Doppler, and the transit-time flowmeter. Open-channel
flows are typically measured using primary and secondary devices. Primary devices are standard
hydraulic structures, such as flumes and weirs that are inserted in the open channel. Inspectors can obtain
accurate flow measurements merely by measuring the depth of liquid (head) at the specific point in the
primary device. In a weir application, for example, the flow rate is a function of the head of liquid above
the weir crest.
Facilities use secondary devices in conjunction with primary devices to automate the flow measuring
process. Typically, secondary devices measure the liquid depth in the primary device and convert the
depth measurement to a corresponding flow, using established mathematical relationships. Examples of
secondary devices are gauges, floats, ultrasonic transducers, bubblers, and transit-time flowmeters. A
recorder generally measures the output of the secondary device transmitted to a recorder and/or totalizer
to provide instantaneous and historical flow data to the operator. Outputs may also be transmitted to
sampling systems to facilitate flow proportioning.
The inspector must assure the industrial user obtains accurate wastewater flow data to calculate mass
loading (quantity) from measured concentrations of pollutants discharged. The industrial user must
produce data that meet requirements in terms of precision and accuracy.
The accuracy of flow measurement (including both primary and secondary devices) varies widely with
the device, its location, environmental conditions, and other factors such as maintenance and calibration.
Faulty fabrication, construction, and installation of primary devices are common sources of errors.
Improper calibration, misreading, and variation in the speed of totalizer drive motors are major errors
related to secondary devices. When evaluating facility installed devices, the inspector should do the
following:
•	Verify that the facility has installed primary and/or secondary devices according to
manufacturer's manual instructions.
•	Inspect the primary device for evidence of corrosion, scale formation, or solids accumulation
that may bias the flow measurement.
•	Verify that weirs are level, plumb, and perpendicular to the flow direction.
•	Verify that flumes are level and smooth-finished, the throat walls (narrowed section of flume)
are plumb, and the throat width is the standard size intended.
•	Inspect historical records (i.e., strip charts and logs) for evidence of continuous flow
measurements and for routine and maintenance operations schedules. Compare periods of
missing data with maintenance logs for explanations of measuring system problems.
•	Observe the flow patterns near the primary device for excessive turbulence or velocity. The
flow lines should be straight.
•	Ensure that the flow measurement system or technique being used measures the entire
wastewater discharge. Inspect carefully the piping to determine whether there are any
wastewater diversions, return lines, or bypasses around the system. Make sure the system meets
the permit requirement, such as instantaneous or continuous, daily, or other time interval
measures. Note anomalies in the inspection report.
•	Verify that the site chosen for flow measurement by the facility is appropriate and is in
accordance with permit requirements.
87

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
•	Verify that the site chosen by the facility for flow measurement is suitable for type of
discharge, flow range, suspended solids concentration, and other relevant factors.
•	Verify that the facility has closed-channel flow measuring devices where the pipe is always
full. If these devices are used, then there must also be a means for the permittee and regulatory
agencies/inspector to verify the accuracy of these meters. Primary open-channeled flow
measuring devices such as weirs and flumes are ideal for this purpose.
•	Verify that the facility uses appropriate tables, curves, and formulas to calculate flow rates.
•	Review and evaluate calibration and maintenance programs for the discharger's flow
measurement system.
•	Verify that the facility calibrates flowmeters across the full range of expected flows.
•	Verify that primary and secondary devices are adequate for normal flow as well as maximum
expected flows. Note whether the flow measurement system can measure the expected range of
flows.
•	Collect accurate flow data during inspection to validate self-monitoring data collected by the
permittee.
•	The facility must install a flow measuring system that has the capability of routine flow
verification by the permittee or appropriate regulatory personnel.
3.8.4	Evaluation of Permittee Data Handling and Reporting
The industrial user facility shall submit information showing the measured average daily and maximum
daily flow, in gallons per day, to the POTW from each of the following:
•	Regulated process streams and,
•	Other streams as necessary to allow use of the CWF of 40 CFR 403.6(e).
3.8.5	Evaluation of Permittee Quality Control
The inspection should evaluate the following QC issues during a compliance inspection to ensure:
•	Proper operation and maintenance of equipment.
•	Accurate records.
•	Sufficient inventory of spare parts.
•	Valid flow measurement techniques.
•	Precise flow data.
•	Adequate frequency of calibration checks.
3.8.6	Evaluation of Flow Measurement Compliance
The objectives of flow discharge measured during the industrial user compliance inspection should be to
verify the flow measurement data collected by the permittee, support any enforcement action that may be
necessary, and provide a basis for reissuing or revising the industrial user permit.
The responsibility of the inspector includes collecting accurate flow data during the inspection and
validating data collected during the permittee's self-monitoring.
88

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
The inspector must check both the permittee's flow data and the flow measurement system to verify the
permittee's compliance with industrial user permit requirements. When evaluating a flow measurement
system, the inspector should consider and record findings on the following:
•	Whether the system measures the entire discharge flow.
•	The system's accuracy and good working order. This will include a thorough physical
inspection of the system and comparison of system readings to actual flow or those obtained
with calibrated portable instruments.
•	The need for new system equipment.
•	The existence or absence of a routine calibration and maintenance program for flow
measurement equipment.
3.9 Compliance Issues Related to Sampling and Analysis
A POTW's compliance monitoring program consisting of receiving and reviewing industrial user self-
monitoring reports, and conducting inspections and sampling at regulated industrial users, is a crucial
aspect of the local pretreatment program. One of the main purposes of this manual has been to ensure the
ability of the POTW to use the information gained (e.g., through proper chain-of-custody, sample
QA/QC, and legal entry procedures) for compliance monitoring. The POTW should follow the procedures
and information outlined in this section to ensure that POTW compliance inspections and sampling
properly establish the compliance status at these facilities.
3.9.1 Duplicate Samples
The use of duplicate samples (both field and laboratory) is a means of determining if the sample
collection and laboratory analyses are adequately precise for compliance determination. In most cases, if
proper QA/QC procedures are followed, the analyses from the duplicates should be very close. This
indicates that the sample collection technique is sufficiently precise and that the laboratory has a high
degree of precision in its analysis of samples. If the duplicate sample results are very close to one another
(i.e., within the QC range established by the laboratory) but one is above the limit and the other is below
the limit, the POTW should average these results together to determine the compliance status of the
industrial user. This can only be done if the sample results are within the QC range of the laboratory.
In other cases, the analytical results from the duplicate samples, even though pulled from the same sample
(or a simultaneous second sample) may yield significantly different analytical results. If this happens, the
POTW needs to make a judgment as to whether the sample can be used for determining the compliance
status of the industrial user. If duplicate samples produce significantly different analytical results, the
POTW should follow the procedures outlined below:
1. Review the Sampling Methodology. It is possible that a duplicate sample, if taken as two
discrete samples, will have very different characteristics. For example, when taking a
duplicate sample for oil and grease, it is usually necessary to take two discrete samples
because it is not possible to split an oil and grease sample. When the two samples are taken,
the sampler may not take each sample in exactly the same way (e.g., one sample may skim
the top of the wastestream and the other may be taken from the bottom of the wastestream).
This can produce two radically different samples, even though they were taken at the same
time from the same place. If duplicate samples are taken from the same sample collection
vessel, make sure that the sample is well mixed and homogeneous so that each sample is as
close as possible to each other. Sample preservation for the duplicate samples must be
checked to ensure that it was the same.
89

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
2.	Check the Laboratory QA/QC. The laboratory and sampling QA/QC procedures should be
reviewed when duplicate samples produce different analytical results. The laboratory should
check to see if blank and spike sample analyses give appropriate results. If the blanks and/or
spikes do not produce expected values, it is highly likely that there is a problem with the
analytical procedures. If the blanks and spikes indicate analytic problems, it may be necessary
to discard the sample and disregard the results when determining the compliance status of the
industrial user.
a. If the source of the discrepancy is identified, the POTW should run another analysis
from the same sample batch making sure to avoid the mistakes on the original
duplicate sample. This is a good reason to take an adequate sample amount when in
the field.
3.	Investigate the Analytical Methodology. The POTW should review the procedures used by
the laboratory personnel when analyzing the sample to ensure that all steps were followed
properly. The POTW should also evaluate the nature of the samples themselves and whether
the samples may be responsible for contributing to any analytical discrepancies (e.g.,
duplicate samples of very high concentration, which require significant dilution, may produce
high relative percent differences which may be due to sampling techniques in the field,
sampling of the aliquot in the laboratory, dilution technique, or a combination of these
factors). POTWs should be aware of this situation when evaluating whether any duplicate
sample results may be used for determining compliance.
4.	Check the Analytic Time Sequence. Very often the sample analysis for duplicate samples is
done sequentially (e.g., as with gas chromatography/mass spectrometry equipment). For such
sequential analysis, it is possible to have the sample analyses far apart in time. If this
happens, the sample holding time may be exceeded resulting in an unstable sample. Even if
the sample holding time has not been exceeded, it is possible that two analyses from the same
sample will produce different results if they are far enough apart in time. Therefore, make
sure that all duplicate samples are analyzed as close together as possible to ensure sample
integrity through the entire analytic process. If the sample has not exceeded its allotted
holding time, the POTW can re-analyze two new samples from the original sample collection
vessel to obtain valid duplicate results.
The POTW also has the option of sending the sample in question to an independent laboratory. This
independent laboratory can serve to give impartial analysis of the sample so that the sample results can be
used to evaluate compliance. If the POTW chooses this option they should evaluate the independent
laboratory in terms of the comparability of its analytical procedures, QA/QC etc., in relation to 40 CFR
part 136 as well as comparability to the POTW's and/or the industrial user's laboratory.
3.9.2 Split Samples
Occasionally, an industrial user will request to split its self-monitoring samples with the POTW. Also, a
POTW may split its compliance samples with industrial users. Each will conduct analysis on the split
sample to compare results. When the POTW accepts a split sample from an industrial user's self-
monitoring sample, this is not considered independent of information supplied by industrial users at 40
CFR 403.8(f)(2)(v) and should not be counted as the POTW's required annual compliance sampling event
or for determination of compliance. However, in the second scenario, where the POTW conducts the
sampling and splits it with the industrial user, this meets the requirement for independent sampling. All of
the analytical results from routine compliance monitoring and additional split sampling deemed
independent must be used in making a compliance determination.
The 1992 EPA Memorandum entitled Determining Industrial User Compliance Using Split Samples
describes how to use the data from split samples for determining industrial user compliance in situations
90

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
where split samples yield different analytical results. This memorandum is included as Appendix F and is
also available at http://www.epa.gov/npdes/pubs/pretreatment letter splitsampleresults.pdf.
In general, the memorandum states that whenever split samples are taken and both are properly preserved
and analyzed according to requirements in 40 CFR part 136, the POTW should average the results from
each sample and use the averaged value for determining compliance and appropriate enforcement
responses. Where the sample results are widely divergent, the POTW should investigate each laboratory
using QA/QC measures, as outlined in Section 3.9.1 above, to determine the cause of the discrepancy. If
one or both of the samples are invalid, the POTW must not use these samples to determine the
compliance status of the industrial user. In situations where one or both of the analytic results is
determined to be invalid, the average value for that sample is also invalid.
The POTW should inform industrial users during the opening conference of their right to receive a split or
duplicate of any physical sample collected by the POTW for laboratory analysis if sufficient sample
volume is collected. Industrial user representatives should indicate at this point their desire to receive split
and duplicate samples so that arrangements can be made to secure the samples during inspection. The
POTW may also consider collecting duplicate samples for splitting with the industrial user when facilities
are suspected of potential violations.
Composite samples containing settleable solids are, at the point of collection, routinely poured into
smaller bottles for specific tests. This is done because some tests require special preservatives (H2SO4,
HC1, NaOH, etc.). The sample collector must ensure that each aliquot is representative of the original
sample. In practice, the composite sample jug is typically capped and shaken before it is poured it into
different bottles. Solids begin to settle as soon as the mixing stops, so this method introduces at least
some error. Below are two sample splitting methods that can be used.
The New York State Department of Environmental Conservation (NYS DEC) Sampling Guidelines and
Protocols include the detailed protocol
http://www.dec.nv.gov/docs/remediation hudson pdf/sgpsect5.pdf. Note that this procedure can be
difficult and may require two people to perform.
Sample Handling and Mixing: Once a sample has been collected, it may have to be split into separate
containers for different analyses. The best way to split liquid samples is to continually stir the sample
contents with a clean pipette or pre-cleaned Teflon rod and allow the contents to be alternately
siphoned into respective sample containers using Teflon or PVC (Tygon type) tubing. Teflon must be
used when analyses for organic compounds or trace metals are to be conducted. Any device used for
stirring, or tubing used for siphoning, must be cleaned in the same manner as other equipment.
The NYS DEC Sampling Guidelines and Protocols also provides guidance on a variation for "shake and
pour" for compositing samples:
1.	Mark the side of the composite carboy so that the contents are divided into thirds.
2.	Cap the composite carboy and shake vigorously.
3.	Quickly uncap the carboy and pour enough into each aliquot container so that it is 1/328 of the
way full.
4.	Pour the remaining portion of the top marked 1/3 of the carboy into a clean container.
5.	Repeat steps 2-4 for the second and final thirds of the composite carboy. All the aliquot
bottles should be filled at the end of this process.
6.	Should an additional aliquot be needed, use the portion retained in step 4. Otherwise discard
that excess.
28 The specific volume fractions may differ for different situations (in this step and step 4).
91

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
In addition, EPA's Handbook for Sampling and Sample Preservation of Water and Wastewater (EPA
600/4-82-029, September 1982) references "shake and pour technique." Section 11.4saysthe composite
sample contents must be mixed or agitated to provide thorough mixing of the sample and the pour up
should be done in a timely fashion to prevent settleable solids from dropping to the bottom of the
composite container. For splitting the sample, it is recommended that the sample be split into a one
gallon container using a funnel, then remixed, then that is split into two separate containers. Another
technique would be to use best judgment based on the sample contents to agitate/mix then pour and stop
when sample personnel believe that the sample is no longer well mixed, then repeat mixing of the
composite sample and then pour up again, then repeat until a complete sample volume is collected.
3.9.3	Compliance with Monthly Average Limitations
There has been some confusion on the part of some POTWs as to how many samples are required to
demonstrate a violation of a monthly average. At a minimum, the POTW needs only one valid sample
from the month to assess compliance with the monthly average. If an industrial user is in violation of its
limit, the violation continues until there is a sample showing the facility is in compliance (see the POTW
Enforcement Response Policy).
3.9.4	Closed Cup Flashpoint and Additional Compliance Sampling
The General Pretreatment Regulations at 40 CFR 403.5(b)(1) require that no discharge to a POTW shall
"create a fire or explosion hazard in the POTW." The regulation further explains this requirement by
setting a closed cup flashpoint limit of less than 140°F (60°C) on wastestreams discharged to the POTW.
Since this prohibitive limit is an instantaneous limit, the POTW must use a grab sample to evaluate
compliance with the closed cup flashpoint requirement.
The POTW should monitor the industrial user's wastestream periodically for the potential of creating a
fire hazard, but this frequency should be based on the nature of the wastestream. If the POTW has reason
to believe that the industrial user has a strong potential to create a fire hazard, monitoring for the closed
cup flashpoint should be conducted regularly. If the POTW has no reason to believe that the industrial
user poses a fire hazard, minimum closed cup flashpoint monitoring can be done.
At a minimum, the POTW should evaluate the industrial user's potential to cause pass-through or
interference, as well as the industrial user's potential to violate any of the prohibitive discharge limits, at
least once every permit cycle (e.g., every five years if the industrial user's permit duration is five years
long).
3.9.5	POTW Sampling In Lieu of Industrial User Sampling
The General Pretreatment Regulations allow for the POTW to take over the periodic sampling and
analysis activities for the industrial user. When the POTW collects all the information required for the
periodic report, including flow data, the industrial user is not required to submit the periodic compliance
report required in 40 CFR 403.12(e) or (h). However, there will be many instances where the POTW will
not be gathering all information that is required in the periodic compliance report (e.g., BMP
documentation, TTO certifications for metal finishers, flow data if the POTW is not monitoring flow,
additional samples collected by the industrial user, etc.). In these cases, the SIU is still required to submit
periodic compliance reports with the remaining information not collected by the POTW. The General
Pretreatment Regulations also require POTWs to "inspect and sample the effluent from each Significant
Industrial User at least once a year" (40 CFR 403.8(f)(2)(v)). The purpose of this inspection and sampling
is to provide compliance status information, independent of the industrial user. If the POTW is already
conducting the periodic sampling for the industrial user, then the POTW is already evaluating compliance
independent of the industrial user. Therefore, if the POTW is conducting the sampling for the industrial
user required under 40 CFR 403.12, the POTW is satisfying the 40 CFR 403.8(f)(2)(v) requirement of
annually sampling the industrial user, and the POTW would only be required to conduct one additional
92

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
sampling event at the industrial user, totaling two events per year, to meet the requirements at 40
CFR403.12(e). The POTW is still required to inspect each SIU annually.
The General Pretreatment Regulations require industrial users to notify the Control Authority and conduct
follow-up sampling if the previous sample taken by the industrial user indicates a violation. The
notification to the Control Authority must be conducted within 24 hours of becoming aware of the
violation, and the results of resampling must be submitted to the Control Authority within 30 days. As
required at 40 CFR 403.12(g)(2), if the POTW is conducting the sampling in lieu of the industrial user,
"the POTW must perform the repeat sampling and analysis unless it notifies the industrial user of the
violation and requires the industrial user to perform the repeat analysis. Resampling is not required if: (i)
The Control Authority performs sampling at the Industrial User at a frequency of at least once per month,
or (ii) The Control Authority performs sampling at the User between the time when the initial sampling
was conducted and the time when the User or the Control Authority receives the results of this sampling."
When the POTW is conducting the sampling in lieu of the industrial user and an effluent limit violation is
detected, the POTW should notify the industrial user as soon as possible. Although the regulations do not
specify a time frame within which the POTW should notify the industrial user, the EPA strongly
recommends that the notification occur within 24 hours of noticing the violation so that measures can be
taken to return the industrial user to compliance. Prompt notification to the industrial user also allows the
industrial user the opportunity to return to compliance with a monthly average limit in some cases, if
additional samples are collected that month. In addition, since the EPA SNC criteria are statistically-
based, the sooner the industrial user knows about the violation, and takes corrective action, it may have
the opportunity to collect more samples in the reporting period, increasing their chances of avoiding being
in SNC.
3.9.6 Determining Compliance for Facilities with Multiple Outfalls
POTWs sometimes encounter situations where industrial users have multiple outfalls (i.e., connections to
the collection system). The question has been raised as to how the POTW should evaluate such situations
for the purpose of determining applicable pretreatment standards to apply to the facility, as well as the
compliance status of the facility, especially with respect to SNC.
Multiple outfall situations can arise in three ways:
•	Multiple categorical operations with multiple outfalls.
•	A single categorical operation with multiple outfalls.
•	A waste stream regulated by local limits with multiple outfalls.
Each of these circumstances is discussed below.
If an industrial user has several outfalls to the POTW from separate categorical operations, each of these
outfalls and each pollutant parameter per outfall must be evaluated separately for the purposes of
determining applicable pretreatment standards and compliance status. For example, if the industrial user
has three outfalls from three separate categorical operations the Control Authority would need to sample
at the end of each individual process to determine compliance with the applicable standards for each
regulated pollutant. Furthermore, if each outfall is regulated for chromium, cadmium and zinc, and the
pollutant concentration from each separate outfall exceeds either the chronic or technical review criterion
for any individual parameter, then the industrial user meets the criteria for SNC and the POTW must
publish a notice of SNC in the newspaper to provide meaningful public notice. When evaluating the
compliance status of the industrial user, keep in mind that the industrial user must be evaluated
categorical operation-by-categorical operation, parameter-by-parameter, and outfall-by-outfall because
categorical standards apply at end-of-process.
93

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
If the industrial user has more than one outfall from the same categorical operation (e.g., several lines
from the same metal finishing operation), the POTW should treat those different categorical operations as
a single, aggregate line for purposes of determining compliance. For example, if a metal finisher
discharges categorical process wastewater generated from different operations in the same process line
through two different sewer connections (without any intermediate treatment), compliance with the
categorical standard should be determined by using a flow-weighted average of the two lines.
Finally, the POTW should be aware of how to evaluate compliance in situations where local limits control
the nature of the discharge and there is more than one discharge point to the POTW. If there is more than
one discharge point to the POTW that is regulated by a local limit (even if the separate outfalls come from
the same process line) then the facility must meet the local limit at each connection to the sewer.
Likewise, the federal prohibitive standards located at 40 CFR 403.5 must be met for each discharge point
to the POTW.
Given the variety of options for multiple discharges that may be encountered, it is important to distinguish
between the applicability of categorical regulations and local limits. Categorical standards apply at end of
process (after treatment) before blending with any other waste streams. Categorical standards are
calculated based on best available treatment technologies and are specific to the industrial process for
which they were developed. They do not give any consideration for risk or impacts to the receiving
waters. Local limits apply at end of pipe and take into consideration water quality, inhibition, and sludge
criteria. When assessing any of the scenarios described in the above paragraphs, the Control Authority
must insure that compliance with applicable discharge standards is being assessed at the appropriate
location. Where multiple waste streams exist, but blend prior to treatment, the CWF must be applied to
the discharge to ensure compliance with all applicable categorical standards.
3.9.7	Violation Date
If a sample taken at an industrial user indicates a violation of a pretreatment standard or the industrial
user's permit, the date of the violation is the date the sample was taken, not the date the sample was
analyzed in the laboratory. For a composite sample, the date of violation is the date the sample was
completed. For example, if a sampler is placed at an industrial user at 8AM on Tuesday and picked up at
8AM on Wednesday (the following day), but the sampler stopped taking samples at 5PM Tuesday, the
date of violation is 5PM Tuesday (not 8 AM Wednesday). (NOTE: In this example, the required holding
time for this sample would commence at 5 PM on Tuesday [see 40 CFR part 136 Table II, footnote 4]). It
is important to correctly determine which quarter a permit limit violation occurs when the POTW applies
the rolling quarters method for determining SNC (as outlined in the EPA Memorandum "Application and
Use of the Regulatory Definition of Significant Noncompliance for Industrial Users," September 9, 1991,
found in Appendix G). When tracking the compliance status of each industrial user, the POTW should
have an automated system that tracks the date each sample was taken at each industrial user regulated by
the POTW.
3.9.8	Continuous Monitoring of pH
The regulations at 40 CFR 403.5(b)(2) prohibit the discharge to POTWs of "pollutants which will cause
corrosive structural damage to the POTW, but in no case discharges with pH lower than 5.0, unless the
works at the POTW are specifically designed to accommodate such discharges."
Under the pretreatment regulations there is flexibility in how a POTW develops its ERP to define varying
levels of response to temporary pH violations. The EPA advises POTWs to incorporate a method into
their ERPs that they prefer when dealing with violations of local limits. The EPA encourages POTWs to
make their own decisions regarding the utilization of resources in response to low pH discharges when
developing an ERP. Excursions under pH 5.0 standard units are pretreatment standard violations (40 CFR
403.5(b)(2)). In determining the appropriate response, the EPA recommends that POTWs consider the
frequency, duration, magnitude, and effect of such excursions, and the compliance history of the facility
94

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
for such excursions. If pH readings below 5.0 are common, the POTW should check the collection system
at the point of discharge to determine if the discharge is causing corrosion. A record should be made of
the response, and the person responsible for screening the data should alert enforcement personnel to the
noncompliance.
Typically, the industrial users review their pH records at the end of each calendar month to determine
compliance for that reporting period and to notify the POTW within 24 hours of becoming aware of the
violation, as required in 40 CFR 403.12(g)(2). It may not be adequate, in this instance, for an industrial
user to notify the POTW of a significant pH exceedance that occurred earlier in the calendar month that is
below pH 5.0 for a significant period of time and if this discharge has a potential to cause or contribute to
worker health and safety or corrosion in the collection system. The EPA recommends the POTW require
the facility to install a continuous pH monitoring alarm that notifies industrial user personnel in case of a
pH below 5.0 to improve the response to the exceedance and notification to the POTW. The EPA
recognizes that the POTW's appropriate response (including no further action, a phone call, or a
notification letter) may vary. This flexibility is intended to reduce the burdens on POTW programs.
POTWs can prescribe SNC criteria in their ERPs for chronic violations of continuously monitored pH
permit limits. The EPA does not provide any official guidance on such criteria. Minimum SNC criteria for
chronic pH limit violations are established at 40 CFR 403.8(f)(2)(viii), but the means of implementation
is not specified.
Some POTWs have developed a definition for violation day (when pH is continuously monitored) and
calculate chronic SNC using the number of violation days out of the total number of days monitored. In
other words, if 66 percent or more of the total days during the SNC assessment period (i.e. total days
monitored) were violation days, the facility would be in SNC for pH (i.e. assuming 7-day-per-week
operation, 120 days or more of daily violations per 6-month period). The definition of violation day is as
follows:
A violation day will have occurred where the pH value is measure outside the local pH limits
established by the POTW for any duration during a calendar day.
In addition to SNC based on violation days, a POTW may also consider an SIU to be in SNC for pH
should any of the following events occur:
•	The exceedance results in a pH below 5.0 standard units at the wastewater treatment plant (or
an alternative more stringent limit that the City has specifically designed to accommodate and
been approved by the city and/or the water board) at any time during the calendar day.
•	The exceedance results in a pH that is outside the limits established by the EPA in an applicable
categorical pretreatment standard at any time during a calendar day.
•	The exceedance causes interference, worker health or safety concerns, and/or corrosive
structural damage to the POTW.
There has also been discussion about whether the pH provisions at 40 CFR 401.17 could serve as a basis
for alternative pH requirements. The effluent guideline regulations list certain conditions under which
excursions from pH limits are allowed for direct dischargers. The EPA developed 40 CFR 401.17 based
on the Agency's determination that direct dischargers could continuously meet a pH limit between 6.0 and
9.0 standard units. In comparison, pretreatment requirements are based on preventing corrosion in
POTWs and are less restrictive. It is the EPA's view that it would be inappropriate to attempt to use 40
CFR 401.17 as a basis for alternative pH requirements because the reason behind establishing the pH
requirement is different. However, POTWs may implement and enforce local pH limits in a manner that
is more stringent than the federal regulations. The EPA has formally responded to this question in a 1993
letter to the State of New Jersey that can be found at http://www.epa.gov/npdes/pubs/owmO 113 .pdf and in
Appendix H.
95

-------
Industrial User Inspection and Sampling Manual
Chapter 3. Sampling Industrial Users
The inspector must check to see if the industrial user has policies for notifying the POTW of all pH
violations (i.e., lower than 5.0 standard units) and whether the industrial user has appropriately notified
the POTW if any of these pH excursions have occurred. The inspector should review pH logs and
printouts to see if excursions have occurred and should ask to review documentation that the industrial
user reported the excursion to the POTW. The inspector should also assess whether appropriate corrective
actions have been taken to address recurring pH excursions, such as pretreatment system adjustment.
3.9.9 Reporting All Monitoring Results
The regulations at 40 CFR 403.12(g)(6) require all SIUs that monitor regulated pollutants more frequently
than required by the POTW, using 40 CFR part 136 procedures, to report all of the results of this
monitoring. Inspectors should inquire as to whether other sampling, beyond sampling required by the
industrial user's permit is being conducted, and determine whether the industrial user should be reporting
these results to the POTW. All valid results taken at the designated sampling point that meet requirements
at 40 CFR part 136 for collection and analysis must be used to determine compliance.
96

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
4. SAFETY CONSIDERATIONS DURING INSPECTION AND
SAMPLING ACTIVITIES
There are inherent hazards with inspecting and sampling industrial facilities. It is important that
inspectors are aware of potential dangers, have accounted for such situations in inspection and sampling
plans, and have a policy that extreme caution is taken to avoid threats to health and safety. It is
recommended that sampling and inspection teams include at least two people for safety purposes. Under
known hazardous conditions (e.g., entering confined spaces) a two-person team should be mandatory.
Inspectors and sampling teams must use all required safety equipment and protective clothing. Appendix I
lists specific hazards that are associated with various industrial facilities. The inspector should use this
appendix as a reference when conducting sampling activities at any of the listed industries. Additional
information can be obtained from the OSHA website at https://www.osha.gov/SLTC/confinedspaces.
This site provides information on obtaining confined space permits, OSHA standards for work place
safety, procedures for atmospheric testing, and safety considerations for specific industry types.
The inspector should also be familiar with the regulations at 40 CFR 403.12(p) that require industrial
users to notify the POTW, the EPA Regional Waste Management Division Director, and state hazardous
waste authorities in writing of any discharge into the POTW of a substance, which, if otherwise disposed
of, would be a hazardous waste under 40 CFR part 261.
Continuous education is essential to a successful safety program. The inspector should be familiar with
the hazards associated with inspections and sampling and the safety measures to be followed. For
example, if the inspector is required to enter a manhole or other confined space, training in confined space
entry and rescue procedures should be required. In addition, a permit for confined space entry is required
under OSHA, and the permit must be obtained prior to field personnel entering a confined space. Potential
hazards in a confined space include toxic gases, such as hydrogen sulfide, chlorine, and carbon monoxide;
or explosive gases, such as gasoline vapors or methane. In addition, an atmosphere may be hazardous
because there is not enough oxygen to support life due to the presence of other gases. A confined space,
such as a manhole, should not be entered until the atmosphere has been tested for sufficient oxygen and
the lack of toxic or explosive gases. Such a confined space should never be entered alone or without a
lifeline.
In general, the potential hazards that POTW personnel will encounter while performing inspections or
sampling at industrial user facilities can be divided into two areas: physical hazards and atmospheric
hazards. The ability to recognize these hazards and follow proper procedures will eliminate most
accidents.
4.1 Physical Hazards
Physical hazards that can be encountered when conducting inspections are numerous and vary by industry
type. The inspector should be constantly aware of his or her surroundings. In production areas there can
be structures that an inspector could hit his or her head on, or trip on, and water or other liquids could
present slipping and falling hazards. Sometimes extremely loud noises are part of the production lines and
caution should be taken to protect from hearing loss. The inspector should never reach into production
lines or enter areas that are restricted without proper safety precautions. Wearing all required safety
equipment such as hard hats, safety glasses, safety shoes, and ear plugs, are important for preventing
possible injuries.
A sampling location can also present potential hazards. Sampling activities are often carried out in
locations that meet the criteria set forth in the definition of confined space. A confined space may have
limited means of entry or exit that is subject to a deficiency of oxygen, and the accumulation of toxic or
97

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
combustible gases. Such locations include manholes, pumping stations, wet wells, storm drains, and water
meter vaults.
Care must be exercised when removing manhole covers and entering manholes or other confined spaces.
Manhole covers should be opened and removed with a properly designed hook. Manhole covers should
never be opened with fingers. Improper lifting of a manhole cover may result in back injury. Caution
must also be exercised when lowering and lifting sampling equipment. A sampler is much heavier when it
is full and is sometimes difficult to lift. Tools should be lowered into and lifted out of the manhole in a
bucket to prevent the tools from falling on someone below.
Generally, the top of a manhole is flush with the surrounding surface. Therefore, a person entering the
manhole may not have anything to hold on to for support. Ladders and steps leading into manholes and
other types of confined spaces are subject to corrosion and may not be well maintained. These structures
should be examined prior to entry. If there is any doubt regarding the soundness of the manhole steps, a
portable ladder should be used. Other physical hazards in a confined space include the following:
excessive depths; high flows; poor visibility; wet/slippery surfaces; harmful animals, insects or
pathogens; protruding or sharp objects; and falling objects.
4.2 Atmospheric Hazards
Atmospheric hazards are comprised of three primary types: oxygen deficient atmospheres;
explosive/flammable atmospheres; and toxic atmospheres. These types of hazards require air monitoring
and ventilation before entering a manhole or other confined space. Air monitoring equipment is discussed
later in this chapter. It should be noted that atmospheric hazards caused or contributed to by an industrial
user discharge that result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity
that may cause acute worker health and safety problems is violation of the specific prohibition at 40 CFR
403.5(b)(7).
4.2.1 Oxygen Deficient Atmosphere
The minimum OSHA requirement for oxygen concentration in the atmosphere is 19.5 percent. A Self-
Contained Breathing Apparatus is necessary to enter an atmosphere with less than 19.5 percent oxygen.
An oxygen enriched atmosphere, which exists when the oxygen concentration is greater than 25 percent,
is also considered hazardous because of its ability to support combustion. Normal air consists of the gases
listed in Table 4-1. Other gases, such as nitrogen and carbon dioxide, which are harmless under normal
conditions, may build up in confined spaces in quantities large enough to displace the oxygen necessary
to support life. When the concentration of oxygen in the atmosphere falls to 10-16 percent, a person will
experience shortness of breath. Loss of consciousness will occur at a 6-10 percent oxygen concentration
and death will occur rapidly when the concentration of oxygen falls below 6 percent.
Table 4-1
Atmospheric Constituents
Gas
Volume
Nitrogen
Oxygen
Argon
Carbon Dioxide
78.09%
20.95%
0.93%
0.03%
98

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
4.2.2	Explosive Atmosphere
Gasoline is the most common flammable liquid found in the sewer system. The major source of gasoline
is leaking underground storage tanks and accidental discharge or spills. Gasoline is lighter than water,
enabling it to float on top of the wastestream, and the vapors spread out in the collection system. It takes a
very small amount of gasoline to generate an explosive atmosphere in a confined space.
Methane is the most common flammable gas encountered in the sewer system. Methane gas is the product
of waste decomposition and is the primary component of natural gas. A leak in a natural gas pipe may
result in the gas seeping into the collection system. Methane is lighter than air, which allows it to collect
at the top of a confined space.
4.2.3	Toxic Atmosphere
There are various guidelines for assessing chemical hazards in the atmosphere. The threshold limit values
(TLVs) are guidelines developed and published by the American Conference of Governmental Industrial
Hygienists to be used for identifying and controlling potential hazards. One form of the TLV, the time
weighted average (TWA), refers to the vapor phase concentration a worker may be exposed to for an
eight hour day or 40 hour work week without chronic or acute health effects. TLV-TWA numbers are
sometimes used to calculate industrial user discharge screening levels for volatile organic compounds.
See TLVs for various chemical substances at http://www.acgih.org/tlv-bei-guidelines/tlv-chemical-
substances-introdiiction.
The EPA has issued a guidance document entitled Guidance to Protect POTW Workers from Toxic and
Reactive Gases and Vapors (EPA 812-B-92-001) June 1992. This document should be used to evaluate
the potential for exposure to toxic atmospheres and necessary steps for avoiding contact with such
atmospheres. Hydrogen sulfide (LhS) is a common gas found in the collection system. The gas, which is
formed by anaerobic decomposition of organic matter, is heavier than air and tends to collect at the
bottom of an enclosed space. At low concentrations, hydrogen sulfide has an odor of rotten eggs, at higher
concentrations, however, the olfactory system becomes impaired and the gas cannot be detected by smell.
The TLV-TWA for hydrogen sulfide is 100 parts per million (ppm). At higher concentrations of H2S,
damage can occur to the eyes, nervous system, and respiratory system. A caustic solution (sodium sulfide)
is formed when the gas comes into contact with moist tissue, such as in the eyes and respiratory tract,
which causes the irritation and danger from the chemical. At concentrations of 500-1,000 ppm the
respiratory system is paralyzed and death will occur.
Hydrogen cyanide gas may be generated when cyanide salts react with an acidic wastestream. Cyanide
salts are often found in plating baths and metal finishing facilities. The gas causes death by preventing the
transfer of oxygen within the bloodstream.
Chlorine (CI2) gas may be encountered at plating facilities where it is used for cyanide destruction. Aside
from the irritating odor, chlorine gas is corrosive in the presence of moisture. It combines with moisture
in the lungs and the respiratory system to form hydrochloric acid. Pulmonary edema (fluid in the lungs)
may occur at 50 ppm and at 1,000 ppm death occurs rapidly.
Carbon monoxide (CO) is another gas that is generated in a collection system from anaerobic
decomposition of organic materials. Asphyxiation occurs from exposure to this gas because the
hemoglobin of the blood has 300 times more affinity for carbon monoxide than for oxygen. Carbon
monoxide combines with hemoglobin to form carboxy hemoglobin. As a result, blood cells with CO
cannot transport oxygen to body tissues, and death occurs.
Toxic vapors also present a hazard to inspectors and sampling personnel. Vapors are the volatile form of
substances that are normally in a solid or liquid state. Chlorinated solvents used in degreasing or
photoresist developing operations generate vapors that may accumulate in the collection system. Some of
99

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
the vapors have an anesthetic effect when inhaled. In addition, the vapors are generally heavier than air
causing oxygen in a confined space to be displaced which may create an oxygen deficiency in that space.
4.3 Safety Equipment
Recognizing the physical and atmospheric hazards associated with inspections and sampling is important.
Simply acknowledging the hazards, however, does not guarantee safe working conditions. An employer is
obligated by OSHA to provide safety equipment and establish a training program for employees. The
important thing to remember is that the responsibility for using the equipment and following safety
procedures rests with the individual inspector. The following discussion will acquaint the inspector with
proper safety techniques.
4.3.1	Protective Clothing
Protective clothing is an important aspect of safety, and the guidelines presented below should be
followed when conducting inspections and sampling at industrial user facilities.
•	Hard Hat - All persons entering a confined space are required to wear a hard hat. A full
strength hard hat with a brim and chin strap provides protection from head injuries. Hard hats
may also prevent injury during process area walk-throughs.
•	Coveralls - A person's skin should be covered as much as possible to prevent scrapes and cuts
and to avoid skin contact with hazardous substances.
•	Gloves - Hand protection is necessary when collecting and/or handling wastewater samples. In
addition to preventing absorption of hazardous chemicals through the skin, gloves will protect
the hands from cuts and scratches. Glove material should be selected to protect the sampler
from the pollutants and hazards in the wastewater (e.g., solvents, biological hazards, etc.).
•	Shoes - Rubber-soled, non-skid, protective-toed shoes (e.g., steel, composite) and boots must
always be worn in or around a confined space, in process areas, chemical storage areas, etc.
Safety shoes are designed to protect against impact and/or hazardous chemicals.
•	Ear Plugs - Ear plugs should be worn when working in areas with high noise levels (e.g.,
general manufacturing areas). This equipment will protect the inspector from the cumulative
effects of loud noises in the work place.
•	Safety Goggles - Safety goggles are necessary during inspections and sampling to prevent eye
contact with hazardous substances. Contact lenses are often prohibited around some industrial
processes such as plating operations. If a hazardous substance comes into contact with a
person's eye through splashing or exposure to mists or vapors, that substance may become
trapped behind the lens where it would be difficult to flush out and could cause severe eye
damage.
•	Safety Vests - Safety vests are necessary warning devices in areas with vehicle traffic.
4.3.2	Traffic Control
Traffic diversions are necessary when inspecting and/or sampling in areas subject to vehicle traffic. For
protection of the public as well as employees, the devices must be installed immediately upon arrival at
the site and must not be removed until the work is completed. The following devices may be used to route
traffic away from an open manhole.
•	Warning Devices - Rotating/flashing lights and arrow boards should be placed between the
work area and oncoming traffic to alert drivers and pedestrians.
100

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
•	Barricades - A vehicle or heavy piece of equipment should be placed between traffic and the
working area. It should not, however, interfere with traffic.
•	High-Level Warning Flag/Cones - Should be used to route traffic through a jobsite. Flagmen
should be used whenever possible and must wear reflective clothing, such as safety vests, hard
hats, and safety shoes.
4.3.3	Communication Devices
Two-way radios and cell phones are effective ways to maintain contact with a main office. For hazardous
sites, a sampling team should make contact upon arrival and departure from each sampling location.
Sampling sites are often located in unpopulated areas; therefore, it is important that the radio or cell
phones be kept in working order in the event it is necessary to call for help. If an accident should occur,
the rescuer must call for help before any assistance is given to the victim.
4.3.4	Air Monitoring Devices
Before sampling in a confined space, tests should be done for: (1) explosive gases; (2) the presence of
toxic gases; and (3) oxygen deficiency. The most effective method for detecting these conditions is with
an atmospheric monitor. The gas detectors discussed below are the most commonly used for atmospheric
monitoring.
•	Single Purpose Detector - Designed to detect specific gases, such as carbon monoxide,
methane, or hydrogen sulfide. These gases are commonly present in collection systems and
confined spaces. Single detection units or tubes are available for measuring gases that are less
common.
•	Dual Purpose Detector - Capable of detecting lack of oxygen and explosive conditions in an
area.
•	Combination Detector - Capable of detecting a lack of oxygen, explosivity and the presence of
toxic gases. This type of meter provides maximum protection by detecting the presence of all
three hazards. Hydrogen sulfide and carbon monoxide are the gases usually measured because
they occur most frequently in a collection system.
The atmosphere in a confined space can change suddenly; therefore, a detector that continuously monitors
the atmosphere is recommended. In addition, detectors should be equipped with an audible and visual
alarm that is activated in response to specific hazardous conditions or a low battery, thus eliminating the
need for taking the time to read a dial or gauge.
It is important to remember that using an atmospheric tester does not ensure safe conditions. Gas
detectors are only one source of information pertaining to a potentially hazardous situation. Most gas
detectors are designed to test for common gases such as hydrogen sulfide, and are not effective for
detecting less common substances such as trichloroethylene vapors. There are test kits available for
detecting the less common gases. The kits consist of a bellows-type pump and glass tubes containing an
indicator chemical which are sealed at the ends until they are used. The indicator chemical in the detector
tube is specific to a particular contaminant or group of gases. A predetermined volume of air is drawn
through the tube and the contaminant reacts with the indicator chemical, producing a color change that
can be compared to a color calibrated chart to determine an approximate concentration.
When measuring explosivity, gas meters measure the percentage of the Lower-Explosive Limit (LEL) of
a calibration gas, which is usually methane. Gases are combustible throughout a range of air mixtures.
The meters do not differentiate between gases, but only indicate explosivity relative to the calibration gas.
The range begins with the LEL, which is the lowest concentration of a combustible gas or vapor in air that
is necessary to support combustion. The explosive range extends upward to the Upper Explosive Limit
101

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
(UEL) which is the maximum concentration that will support combustion. If the concentration of gas is
below the LEL, there is insufficient fuel to support ignition. Alternatively, if the concentration is above
the UEL, there is insufficient oxygen to support combustion. These limitations in the atmospheric
monitoring equipment emphasize the need for constant ventilation and awareness of potential hazards.29
4.3.5	Ventilation Devices
Few confined spaces have adequate natural or mechanically induced air movement, and in most spaces, it
is necessary to remove harmful gases or vapors by ventilation with a blower or fan. The most common
method of ventilation uses a large flexible hose attached at one end to a blower with the other end
lowered into the space. The blower will push fresh air into the space to purge the area of hazardous
substances. The blower allows the fresh air to enter the space at the lowest point possible. Because the
atmosphere in a confined space can change quickly, ventilation should be continuous.
4.3.6	Safety Harness and Retrieval System
Any entry into a confined space must always be performed by a team consisting of at least two people. A
standby person must be stationed outside of the confined. OSHA says that the duty of the attendant is to
"maintain communication with and keep an accurate account of those workers entering the permit space."
All personnel required to enter the confined space must wear a safety harness. A full body parachute type
harness with a lifeline attached at the shoulders is recommended. This type of harness will keep a body
vertical and prevent a limp body from falling out when being pulled out of an area.
The lifeline should be attached to a retrieval system which includes a fall arrest mechanism. This type of
safety system works in a similar manner as an automobile safety belt where a centrifugal locking
mechanism is activated when a fall occurs. If a rescue attempt is necessary, this type of retrieval system
eliminates the need to enter the space. Approximately one half of all fatalities that occur in confined
spaces are unplanned rescue attempts where a worker instinctively rushes into the confined space to assist
an injured co-worker.
The retrieval system should be purchased from a reputable manufacturer or authorized distributor as
complete systems, including, repair, and training for proper use. Most components of a retrieval system
must meet certain manufacturer specifications and substitution of these components may result in liability
for personal injury.
Safety equipment must be maintained and inspected on a regular basis. A safety harness and rescue rope
should be examined for frayed strands of fibers, cuts or tears, chemical damage, decay, and kinks or
extreme stiffness. Visual inspection of this equipment should be made prior to each use, and formal
procedures should be implemented for periodic inspection and maintenance.
4.3.7	Respirators
The primary function of a respirator is to prevent exposure to hazardous atmospheres. It is important to
choose a respirator based on the job to be performed and the potential hazards to which an employee may
be exposed. The basic types of respirators are:
•	Air Purifying - Masks that filter dangerous substances from the air.
•	Air Supplying - Devices that provide a supply of safe breathing air from a tank.
29 Combustible gas meter alarms are usually set at a point well below the LEL of the gas or atmosphere being
measured.)
102

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
An air-purifying respirator will remove particles of dust and light concentrations of gas or vapors, but it
will not protect against heavy gas concentrations. In addition, this type of respirator provides no oxygen
other than what is filtered through the mask. Air-purifying respirators include the following types:
•	Gas and Vapor Respirators - Contaminated air is passed through charcoal that traps gases and
vapors.
•	Particulate Respirator - Contaminated air is passed through a filter for removal of particles.
•	Powered Air-Purifying Respirator - A blower passes contaminated air through a device that
removes contaminants and provides purified air to a facepiece.
•	Combination Gas, Vapor, and Particulate Respirator (referred to as a gas mask) - Gas, vapors,
and particles are filtered out by passing contaminated air through a canister containing a filter
and a device that will absorb gases and vapors.
Air-purifying respirators must never be used in oxygen deficient atmospheres. Due to this limitation, the
air supplying respirator is more appropriate for entering confined spaces that are subject to oxygen
deficiency.
Air supplying respirators differ from air-purifying respirators in that the air the wearer breathes is
provided from an outside source. Types of air-supplying respirators include:
•	Self-Contained Respirators - Offer protection from toxic gases and oxygen deficiency by
providing a transportable supply of breathable air. An example is the self-contained breathing
apparatus (SCBA).
•	Supplied-Air Respirators - Breathable air is supplied to the wearer from a compressor through
an air hose.
•	Combination Self-Contained and Air-Supplying Respirators - An auxiliary cylinder provides
assistance if the supply from the air hose is cut off.
Personnel must be aware of the atmospheric hazards they may encounter and should use respirators that
are appropriate for those hazards. Only use respirators that have been approved by the National Institute
for Occupational Safety and Health (see 29 CFR 1910.134) found at
https://www.osha.gov/pls/oshaweb/owadisp.show document'.'p id=12716&p table=standards
In an emergency, respirator devices become an essential piece of protective equipment. Failure of this
equipment could result in injury or death. Instructions for use, cleaning, and maintenance must be strictly
followed for safe use of any respirator. Employees must receive thorough training in the use and
limitations of their respirators.
4.4 Confined Space Entry
Confined space entry must always be considered a hazardous task due to the potential exposure to
physical and respiratory hazards. Upon arrival to a sampling site subject to vehicular and pedestrian
traffic, the sampling team must immediately position the work vehicle and properly place traffic control
cones and warning flags, as necessary. Once this has been completed, the atmospheric conditions of the
confined space must be tested for oxygen deficiency, explosivity, and toxic gases. The following air
monitoring procedures should be followed:
•	Calibrate air monitoring equipment. Each gas detector has its own calibration method, and
personnel must be trained in the calibration and operating procedures for each piece of
equipment available for their use. In addition, personnel must know how to interpret the
readings of the equipment. Calibration data should be documented and included in field
records.
103

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
•	Place the tip of the air monitoring probe into the vent hole of a manhole to test the atmosphere.
Nonmetallic probes should be used so that a spark is not accidently produced.
•	If the reading is acceptable, remove the manhole cover and test the manhole. Because gases and
vapors may be heavier than air, the atmosphere in the manhole should be tested at several
depths, from the top to the bottom.
•	If readings inside the confined space are acceptable, proceed with the confined space entry
procedures. If the readings are not acceptable due to an explosive atmosphere, the manhole
cover may cause a spark and consequently should not be opened. When an explosive
atmosphere is encountered, the proper authorities (local fire department) should be contacted
immediately. If the reading is unacceptable due to a lack of oxygen or accumulation of gases,
the space must be ventilated until the reading is acceptable. The length of ventilation time
depends on the size of the space.
All personnel entering a confined space must wear a full body harness in addition to required safety
equipment (i.e., hard hat, safety gloves, etc.). Confined spaces should never be entered alone or
unassisted. There must always be a second person available for emergency situations. In addition, when
entering a confined space, a self-contained breathing apparatus should always be worn in addition to the
harness, unless you have proper ventilation and air monitoring equipment. The harness must be attached
to a safety line that in turn is attached to a retrieval system located above the ground. In an emergency, the
standby person should use the retrieval system to quickly remove the injured person.
4.5 Safety Training
The importance of proper safety training cannot be emphasized enough. If an emergency should arise,
sampling personnel must be able to determine the cause of the accident and be prepared to act
accordingly. Far too often, the rescuer, because of inadequate preparation, becomes another victim. Safety
procedures should become routine, and the best way to accomplish this is through continuous training.
Training in the following areas should be provided to all employees required to work in confined space or
with a team that performs work in a confined space:
•	Cardiopulmonary resuscitation (CPR) and basic first aid.
•	Use of applicable safety equipment.
•	Confined space entry procedures.
Safety training is available to POTW personnel through approved state agencies and the EPA. Some of
these courses may involve fees, and details can be obtained from the POTW's state or EPA Regional
Pretreatment Coordinator.
Entry and exit procedures include the following steps:
•	Identification. Sampling personnel must be able to identify the potential hazards associated
with inspections and sampling. Training should emphasize the possible results of improper
safety procedures.
•	Testing. All confined spaces must be tested prior to entry.
•	Evaluation. Tests must be evaluated for oxygen level, explosivity, and potentially toxic
substances. Sampling personnel should also consider necessary safety equipment.
•	Monitoring. The atmosphere in a confined space is subject to change. Therefore, the area
should be continuously monitored during the sampling activities.
104

-------
Industrial User Inspection and Sampling Manual Chapter 4. Safety Considerations During Inspection
	And Sampling Activities	
Rescue procedures must be developed for each type of confined space that may be encountered by the
sampling personnel. A written record of training and safety drills should be kept. Rescue procedures
should be practiced frequently enough to ensure proficiency in any necessary rescue situations. In
developing a successful training program, the POTW is encouraged to call on other agencies (e.g., local
fire and rescue department) with expertise in any of the areas described above.
105

-------
Industrial User Inspection and Sampling Manual
Chapter 5. Additional Resources
5. ADDITIONAL RESOURCES
The following are documents that can be used for additional information. These documents can be found
on the EPA website at https://www.epa.gOv/npdes/national-pretreatment-program#overview.
Appendix W - Best Management Practices Mini-Case Studies" of "Local Limits Development Guidance
Appendices," EPA 833-R-04- 002B, July 2004.
(https://www3.epa.gov/npdes/pubs/final local limits appendices.pdf).
Associated Water and Air Resource Engineers, Inc. 1973. Handbook for Industrial Wastewater
Monitoring. USEPA, Technology Transfer.
Blasso, L. 1975. "Flow Measurement Under Any Conditions," Instruments and Control Systems, 48(2):
45-50.
Bos, M.G. 1976. Discharge Measurement Structures, Working Group on Small Hydraulic Structures
International Institute for Land Reclamation and Improvement, Wageningen, The Netherlands.
Controlling Fats, Oils, and Grease from Food Service Establishments, EPA Fact Sheet
http://vosemite.epa.gov/QA/RHC/EPAAdmin.nsf/Filings/360737AD61D13C6E8525764E0Q68D81
2/$File/CWA082009003 lATTACHMENTS.pdf.
Eli, R., and H. Pederson. 1979. Calibration of a 90° V-Notch Weir Using Parameters Other than
Upstream Head. EPA-61809A-2B.
Guide to Industrial Assessments for Pollution Prevention and Energy Efficiency (EPA-625-C-99-003)
Guidance Manual for the Use of Production-Based Pretreatment Standards and the Combined
Wastestream Formula (EPA 833/B-85-201).
Guidance to Protect POTW Workers from Toxic and Reactive Gases and Vapors (EPA 812-B-92-001).
Guidance for Developing Control Authority Enforcement Response Plans (September, 1989).
Guidance Manual: Aluminum, Copper, and Nonferrous Metals Forming and Metal Powders Pretreatment
Standards (EPA 800B89001).
Guidance Manual for Battery Manufacturing Pretreatment Standards (EPA August 1987).
Guidance Manual for Electroplating and Metal Finishing Pretreatment Standard (EPA-440/l-84/091g).
Guidance Manual for Implementing Total Toxic Organics (TTO) Pretreatment Standards (September
1985) http://www.epa.gov/npdes/pubs/owmOQ21 .pdf.
Guidance Manual for Iron and Steel Manufacturing Pretreatment Standards (EPA September 1985).
Guidance Manual for Leather Tanning and Finishing Pretreatment Standards (EPA 833B86101).
Guidance Manual for Pulp, Paper, and Paperboard and Builders' Paper and Board Mills Pretreatment
Standards (EPA July 1984).
Industrial User Permitting Guidance Manual (September, 2012) 833-R-12-001A.
ISCO. 1985. Open Channel Flow Measurement Handbook, Lincoln, Nebraska. (Contains tables of
various flow measurement devices).
King, H.W., and E.F. Brater. 1963. Handbook of Hydraulics. 5th ed. New York: McGraw-Hill Book Co.
(contains tables of various flow measurement devices.)
Local Limits Development Guidance (EPA 833R-04-002A, 2004).
Mauis, F.T. 1949. "How to Calculate Flow Over Submerged Thin-Plate Weirs." Eng. News-Record, p. 65.
106

-------
Industrial User Inspection and Sampling Manual
Chapter 5. Additional Resources
Metcalf & Eddy, Inc. 1972. Wastewater Engineering. New York: McGraw Hill Book Co.
Permitting Guidance for Semiconductor Manufacturing Facilities (EPA April 1998).
Permit Guidance Document - Pulp, Paper and Paperboard Manufacturing Point Source Category
(EPA 821-B-00-003).
Permit Guidance Document - Transportation Equipment Cleaning (EPA 821-R-01-021).
Product and Product Group Discharges (OCPSF) (EPA April 2005).
Pollution Prevention (P2) Manual for the Pesticide Formulating Packaging and Repackaging Industry.
Protocol for EPA Approval of Alternate Test Procedures for Organic and Inorganic Analytes in
Wastewater and Drinking Water (March 1999) can be found at
2007_02_06_methods_atp_EPA821B98002.pdf.
POTW Sludge Sampling and Analysis Guidance Document (EPA 833-B-89-100).
NPDES Compliance Inspection Manual (EPA July 2004) EPA 305-X-04-001.
Pretreatment Compliance Monitoring and Enforcement Guidance (EPA July 1986).
RCRA Information on Hazardous Wastes for Publicly Owned Treatment Works (EPA 833/B-85-2025).
Robinson, A.R. 1965. Simplified Flow Corrections for Parshall Flumes Under Submerged Conditions,
Civil Engineering, ASCE.
Shelley, P.E., and G.A. Kirkpatrick. 1975. Sewer Flow Measurement; A State of the Art Assessment,
U.S. Environmental Protection Agency, EPA-600/2-75-027.
Simon, A. 1976. Practical Hydraulics. New York: John Wiley & Sons.
Small Entity Compliance Guide - CWT [Centralized Waste Treatment] (EPA 821-B-01-003).
Smoot, G.F. 1974. A Review of Velocity-Measuring Devices. U.S. Department of the Interior (USDI),
United States Geological Survey (USGS). Open File Report, Reston, Virginia.
Stevens. Water Resources Data Book, Beaverton, Oregon. (Contains tables of various flow measurement
devices).
Supplemental Manual on the Development and Implementation of Local Discharge Limitations under the
Pretreatment Program: Residential and Commercial Toxic Pollutant Loadings and POTW Removal
Efficiency Estimation (EPA 21W-4002).
Thorsen, T., and R. Oden. 1975. "How to Measure Industrial Wastewater Flow," Chemical Engineering,
82(4): 95-100.
U.S. Department of Commerce, National Bureau of Standards. 1975. A Guide to Methods and Standards
for the Measurement of Water Flow. COM-75-10683.
U.S. Department of the Interior (USDI), Bureau of Reclamation. 1967. Water Measurement Manual, 2nd
Ed. (Contains tables of various flow measurement devices.)
U.S. Environmental Protection Agency, Office of Water Enforcement and Permits Enforcement Division.
September 1981. NPDES Compliance Flow Measurement Manual.
U.S. Environmental Protection Agency, Video: National Pollutant Discharge Elimination System
(NPDES) Parshall Flume inspection. 1991. EPA 832-V91-001. Available at:
http://www.voutube.com/watch?v=v6hiOLgTo6g99.
107

-------
Industrial User Inspection and Sampling Manual
Appendices
Appendices
108

-------
Industrial User Inspection and Sampling Manual Appendix A. General Industrial User Inspection Questions
Appendix A. General Industrial User Inspection Questions
GENERAL QUESTIONS
Usage of Chemicals. Cleaners, and Location of Drains
•	Check the proximity of any chemical storage areas to floor drains. What kind of chemicals
are stored? Chemicals might include, paint, thinner, solvents, etc. Are the chemicals
stored in a way that they could reach the floor drains if spilled?
•	Check the floor washdown procedures (frequency, water usage, detergents). What is the
frequency (daily, periodical) of the washdown? Are high pressure sprays used? Are
detergents used? How is the wash water disposed?
•	If floor drains are sealed, do employees have access?
•	Check for the use of detergents and chemical cleaners for equipment washdown. Acids
(e.g., muriatic, sulfuric, phosphoric, acetic, etc.), surfactants, caustic soda, soda ash, and
phosphates are commonly used as cleaners. How are these materials stored? How are
working concentrations of chemical prepared, and who prepares them?
Solvents
•	Does the facility use any solvents or degreasing agents?
•	Are any solvent wastes handled separately from the other cleaning solution wastes?
•	Is there any batch pretreatment prior to discharge?
•	How are any residual materials, sludges at the bottom of the tank disposed?
•	Is there a solvents management plan to reduce solvent waste at the facility?
•	If solvents are used, are they redistilled on-site? Does this process generate
uncontaminated cooling water? Where is it discharged?
Cooling Waters
•	Are there any sources of uncontaminated cooling water in the plant? Are there any
sources of recirculated or once-through cooling waters? What is the disposal method of
the cooling water?
•	If contact cooling water is used, is it treated in any way before discharge? What
contaminants would be in the water? Are conditioning chemicals added to cooling
waters?
•	Is there any water cooled machinery used by the facility? What contaminants would be in
the water? What is the volume and how is the cooling water disposed?
Boiler Discharge
•	Check the frequency and volume of any boiler blowdown. Check on the usage of
additives to the boiler make-up waters. Do the additives contain any metals or priority
pollutants?
•	What types of boiler pretreatment is used (e.g., ion exchange, chemical addition, etc.)?
Are there any boiler wastes generated?
109

-------
Industrial User Inspection and Sampling Manual Appendix A. General Industrial User Inspection Questions
•	What is the frequency and volume of boiler blowdown?
•	Is the wastestream acting as a dilution stream at a process monitoring point?
•	Are there air pollution control devices which use water? How is the water disposed?
Steam Supply and Noncontact Cooling
Steam Supply
•	Is the system high or low pressure steam?
•	What, if any, are boiler additives? Do they contain chromates?
•	How frequent and what is the quantity of boiler blowdown?
•	What is the use of the boiler? (hot water? steam? other?)
•	Is major cleaning and maintenance done? How often?
•	Are ion exchange systems used for boiler feed water? If yes, what types of wastes are
generated?
•	What water treatment chemicals are used for the boiler? How frequent is preventative
maintenance conducted (i.e., cleaning/descaling of the boiler tubes and the boiler drum)?
Noncontact Cooling Water
•	Is there any cooling water used? (What type? Single pass? Cooling tower?). If single
pass, what is it used for? What is the volume? Where is it discharged?
•	Are cooling towers used? If yes, what are the chemical additives?
•	How frequently are towers blown down? Where does the blowdown go?
•	Are closed systems ever by-passed? Under what circumstances?
Discharge Locations and Sampling Points
•	Are the facility's domestic and process wastewaters segregated?
•	What method is used to determine domestic and process discharge volumes?
•	Are dilution streams accounted for at the monitoring point?
•	Does the facility have a sampling point available which is representative of the process
wastewaters discharged?
Pretreatment
•	What kind of treatment systems does the facility have in place for each of the various
types of process wastewaters discharged? What chemicals are added? How often is the
monitoring equipment calibrated?
•	Are any of the process wastewaters subject to national categorical pretreatment
standards? If so, are dilution wastestreams accounted for during monitoring?
•	Does the facility combine its waste from the various sources prior to treatment or
discharge? Is the combined wastestream formula applicable? If so, is the proposed
wastestream volume determination method accurate?
110

-------
Industrial User Inspection and Sampling Manual Appendix A. General Industrial User Inspection Questions
•	Does the facility have any oil/water separators or sand traps? How often are they cleaned
and by whom? Verify documentation.
Solids Disposal
•	How much sludge material is generated? How is the sludge disposed? How much waste
is stored on site?
•	Is the sludge either a listed RCRA waste or characteristic hazardous waste? Does this
facility manifest waste? Who handles the waste transport/disposal?
Radioactive Materials
•	Quantify the maximum quantity of each radionuclide used, stored, and discharged at the
facility.
•	How are liquid and solid radioactive wastes being disposed of?
•	Are they being hauled away? If so, what is the name of the hauler and what is the
destination of the waste? Are manifests available?
•	Are they being discharged to the sanitary sewer? If so, how often and what are the
maximum concentrations in curies?
•	Obtain a copy of radioactive user licenses.
•	Obtain a copy of any protocols for handling radioactive materials at the facility.
•	Obtain a copy of any logs pertaining to radioactive discharges.
Ill

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
Appendix B. Industry Specific Questions
QUESTIONS TO CONSIDER DURING THE SITE INSPECTION OF
SPECIFIC INDUSTRIES
INDUSTRY SPECIFIC SITE INSPECTION QUESTIONS
Adhesives and Sealants
•	What is the product manufactured at the facility? Are the adhesives water-based or
organic solvent base materials? What kind of binder material is used?
•	Are there any product washing operations? Are reactor vessels washed down between
batches? Is water or a solvent used? Would these wastes be discharged to the sewer?
What is the frequency and volume of washing operations?
•	Check the general questions on solvents listed below.
•	Check the usage of cooling waters.
Agricultural Refilling Establishments (see Pesticides)
Aluminum Forming
•	What is the production rate of this facility in terms of mass of aluminum or aluminum alloy
processes per year? Is there an accurate method for determining off-lbs from individual
processes?
•	What are the forming processes at the facility? Is there a wastestream generated from
any air pollution control unit present?
•	What kind of metal forming lubricating compounds are used? Is water recycling feasible?
•	How often are the lubricant-wastewater emulsions changed and discharged?
•	Is there a continuous overflow from quenching water baths? What is the disposal method
for the quench waters?
•	Is any casting done on site? If yes, see questions under Metal Refineries and Foundries
listed below.
•	Are any solvents used as part of the cleaning processes? Refer to the General Industrial
Inspections Questions for Solvents.
•	Are wastewaters from desmutting and deoxidizing pretreated before discharge to the
sewers? What volume is discharged?
Are there any metal finishing processes (anodizing, chemical conversion coatings,
coloring, dyeing, chemical sealing, chemical or electrochemical brightening, or etching)
done on site? If yes, refer to questions under Electroplating and Metal Finishing listed
below.
Auto Body Repair and Paint Shops
•	What is the chemical usage, destination, and storage of paints, thinners, and other
solvents in proximity to floor drains?
112

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Do paint booths have a water curtain? If so, how often is it discharged? How is the
bottom sludge disposed? Are water conditioning chemicals used?
•	What are the floor washdown procedures (frequency, water usage, detergents)?
•	What are the paint spray-gun cleaning procedures (destination)? Are employees trained
to paint efficiently, thus reducing contaminants to the sewer?
•	How does the facility dispose of old unwanted paint?
Auto Parts and Supplies: Wholesale and Retail
• Look for floor drains first.
*	If floor drains present, quantify storage of oils, paint, anti-freeze, transmission and brake
fluids, and any other fluids.
*	Batteries, battery acid.
*	Crankcase oil and return facilities.
•	Any machining or repair (see auto repair questions).
Auto Repair (mechanical) - Engine and Transmission Work
•	How are parts degreasers and solvents used? What types are used?
•	Are alkaline or acid cleaning tanks present? If yes, are these tanks discharged to the
sanitary sewer system, and if so, at what frequency? What Pretreatment occurs prior to
discharge? How is the bottom sludge handled?
•	What are the servicing procedures?
•	Storage of fluids such as oil, transmission, brake, anti-freeze?
•	Look for drains under service bays - destination?
•	Presence of gas/oil interceptors (describe).
•	Waste oil storage and eventual destination.
•	Routine washdown of the work area?
Auto Wash
•	Is there any system for water reclamation such as a settling tank?
•	If a settling tank exists, how is the sludge from it handled and by whom?
•	What types of cleaners are used? Do any specialty cleaners, such as tire cleaners,
contain solvents? Do waxes contain solvents?
•	Is there an oil and grease separator on discharge lines?
•	Are liquids stored near floor drains?
•	What is water consumption?
•	Can the facility handle trucks? If so, what kinds of materials might be contained in the
trucks and what is the wash water contamination from these materials? (Refer to
Transportation Equipment Cleaning (TEC)
113

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
Bakeries - Retail
•	Check the washdown and cleanup procedures.
*Note washdown procedures (sequence of steps).
*Note number of wash downs per day.
*Note types of detergents used.
*Note the location and number of floor drains.
•	Check the storage of cleaning agents.
•	Check the storage of baking ingredients.
•	Check the quantity of deep fry grease generated. Note how it is disposed.
•	Check for the presence of any grease interceptor. Describe the size and general
condition of the unit. How often and by whom is it serviced? How is the grease disposed?
Battery Manufacturing
•	What is the production rate of the facility (number of units manufactured, amp per hour
output, etc.)?
•	What is the primary reactive anode material (cadmium, calcium, lead, leclanche, lithium,
magnesium, nuclear, zinc) used for the batteries produced at the facility?
•	What volume of wastewater from electrodeposition rinses, scrubber bleed off and caustic
removal is discharged to the sewer?
•	Are depolarizers used in the manufacturing process? What type? What is the final
disposal method of these materials?
•	What kind of electrolytes does the facility use? Check the General Industrial Inspections
Questions for Usage of Chemicals, Cleaners and Location of Drains.
Beverages
•	Refer to questions under Food Processing listed below.
Blueprinting and Photocopying
•	Check to see if they do any offset printing (related questions). What type of blueprinting
machines? With some the ammonia is totally consumed while others will have a spent
ammonia solution to dispose of.
•	Any significant amount of ammonia storage? Are there floor drains nearby?
•	Check the usage of other cleaning agents and solvents. Are there any chemicals of
concern?
Canned and Preserved Fruits and Vegetables
•	What detergents and techniques are used in washing the fruits and vegetables before
rinsing?
•	Besides water use for washing, rinsing and cooling, is water also used for conveyance?
Amounts used?
114

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Is peeling done chemically (i.e., caustic soda, surfactants to soften the correx)? Is there
any discharge?
•	Are equipment and floors washed down with water? Daily? Periodically? Are any
detergents used? Is the waste water sewered?
•	Does the facility have a grease and solids recovery system? Any other pretreatment
before discharge?
•	What is water consumption? How much is incorporated into product?
•	What percent of water use is recycled? Does this include any uncontaminated water (for
refrigeration, machinery, etc.)?
•	What types of processing brines are used, if any? Are these sewered directly or
pretreated first?
•	Are larger remains of processed waste fruit and vegetables ground up and sewered or
used as by-products?
•	Check the refrigeration system for possible leaks.
•	Are containers made? Are they washed or sterilized?
•	Are there any fungicides or other similar chemicals used in processing? Are they
discharged to the sewer?
•	Are domestic wastewater and process wastewater segregated?
•	Does a representative sampling point exist?
Centralized Waste Treatment
•	How are incoming wastes characterized?
•	Are there multiple categories of wastes or just one?
•	What types of wastestream categories?
•	Does the permit contain effluent limits for all subcategories of wastes that are received
(metals, oils, organics, mixed)?
•	In addition to receiving off-site wastes, does the facility produce any wastes on-site?
•	Does the facility accept any RCRA wastes? If so, is the facility permitted to receive RCRA
wastes?
•	Are different waste categories segregated, or are they combined prior to treatment?
•	What are the treatment trains? Are the treatment trains appropriate for all subcategories
of wastes that are received?
•	Are hauled waste manifests used? Are they used appropriately?
•	Are all wastes hauled to the CWT or does the CWT go get the wastes?
Coil Coating (Including Can Making)
•	What is the average square footage of metal sheeting processed at the facility (either on
a daily or annual basis)?
•	What is the base metal processed (aluminum, galvanized steel, and/or steel)?
115

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Check the General Industrial Inspections Questions for solvents.
•	What sort of conversion coating is used at the facility (chromating, phosphating, complex
oxides)?
•	What solvents are used to control viscosity?
•	Is there a continuous overflow from quenching water baths? What is the disposal method
from the quench waters?
Can Making (in addition to the questions above)
•	What kind of metal forming lubricants does the facility use?
•	What is the volume of rinse waters discharged to the sewer? Have the wastewaters been
characterized?
Copper Forming
•	What is the quantity of copper and/or copper alloy processed by the facility in terms of
pounds, kilograms or tons per day?
•	What copper forming processes are employed at the facility?
•	What kind of metal forming lubricants does the facility use? How often are spent
lubricants from hot and cold rolling and drawing processes discharged?
•	What acid is used in the pickling process? Are any additional chemicals added to the
rinse tanks? How often are acids changed? How is acid disposed of? Are rinse tanks
continuous overflow?
•	Are any bright dip tanks used? What type? How often are solutions changed? Refer to
the questions for Electroplaters and Metal Finishers.
•	Refer to the General Industrial Inspection Questions for Solvents.
•	Is any hydrostatic testing done on-site? Volume of water used? What pollutants are
associated with the discharge?
•	Is any casting done on site? See questions for Metal Refineries and Foundries.
Dairy Industry
•	What products are manufactured at this plant?
•	Are bottles washed? Are containers washed or sterilized? Any chemicals used in the
washdown?
•	What chemical cleaners are used for equipment washdown? (Acids such as muriatic,
sulfuric, phosphoric, and acetic, surfactants, caustic soda, soda ash, and phosphates are
commonly used as cleaners.)
•	Are acids properly neutralized before they are discharged?
•	Are any by-products wasted? (Buttermilk, whey, skim milk are very high in solids and
BOD.)
•	How are spoiled materials disposed of?
•	What sources of uncontaminated cooling water in the Plant? Recirculated or once-
through? If once-through, what is the destination? (Cooling water is used in some
116

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
pasteurization processes, for condensation, refrigeration systems to cool the ammonia
compressor jacket, and space air conditioning.)
•	What is the water consumption per day on the average? How much is incorporated into
the product?
•	Any pretreatment units such as settling or grease traps or filtering devices or flocculating
tanks?
•	Frequency and volume of boiler blowdown, if any? Additives?
•	Is there segregation of process wastewater and domestic?
•	Does an accessible sampling point exist?
Electric Services
Steam Electric Power Generation
•	Are plants coal, oil, or gas fired?
•	What type of boiler pretreatment is used - iron exchange, additives, etc.? What are
wastes?
•	How frequent is major boiler blowdown? Volumes?
•	Are there air pollution control devices which use water?
•	Are there ash handling systems which use water?
•	What is the source of condenser cooling water (e.g., city, river, wells)? Are there any
water treatment chemicals added? What is the ultimate destination of condenser cooling
water?
•	What is done with waste oils? Are they filtered and reused?
•	Are process and domestic wastewater segregated?
Pepco Substations
•	Look for oil and solvent storage - proximity to floor drains.
•	Any contact cooling water discharge.
•	Possibility of leaking transformer oil - What would its destination be? What is PCB
constituent of oil?
Electronic Components
•	What is the product that is manufactured at this facility?
•	What metals are used in solution or otherwise present in process tanks? Any photo
resist? Explain.
•	Does the facility use any solvents or degreasing agents? If yes, check the General
Industrial Inspection Questions for Solvents.
•	What types of rinse tanks, or rinsing procedures are used?
•	Does the facility use any cooling water? Check the General Industrial Inspection
Questions for Cooling Waters.
117

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Does the facility have a clean air room for which it must scrub air? Are there any chemical
wastes generated from the scrubber? How is the waste disposed?
•	Does the facility conduct any electroplating activities? Check the questions under
Electroplating and Metal Finishing.
•	Any lead soldering being done? Explain.
•	Any water recycle/reuse within the plant? Does the plant employ pretreatment for the
recycle streams?
•	How are spent or contaminated process tanks handled?
•	Does the facility employ any photographic processes?
•	Any routine washdown of the process areas?
•	Check the General Industrial Inspection Questions for Solids Disposal.
Electroplating and Metal Finishing
•	Are any of the following processes performed: electroplating, electroless plating,
anodizing, coating, chemical etching and milling or printed circuit board manufacturing? If
so, are ancillary processes being performed?
•	What metals are being plated? What other metals are in use in solution or otherwise
present in process tanks?
•	What types of chemicals make up plating baths? Is there cyanide? Chromium?
Ammonium persulfate (etching)?
•	Are plating (concentrated) bath solutions ever disposed of? If so, how? Any batch
pretreatment prior to discharge? How are residual materials at the bottom of the tank
disposed of?
•	Are there other operations - coloring, brightening, etc., associated with the plating
operations?
•	If metal coloring is present, are organic dyes used?
•	Are any tanks heated?
•	Are any cyanide bearing solutions or wastestreams present? What metals are complexed
with cyanide? What chelating agents are used to hold metal(s) in solution?
•	Are alkaline cleaning or acid cleaning tanks present?
•	How often are cleaning solutions - both acidic and alkaline - changed and how are they
disposed of? Volumes? Discharged as "slugs?" Any batch treatment prior to discharge?
How are any residual metals (i.e., sludge) disposed of?
•	Are there any wastewaters discharged without pretreatment?
•	Are solvents and/or degreasing agents used? If so, what type and how is the sludge
handled? How are they applied? Dip tank, rag applied, or other? Is solvent redistilled if
used? Any discharge of solvents to sewer? Toxic Organic Management Plan (TOMP)?
Any cooling water used?
118

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	For the TOMP: Do you have a copy? What is the date of the TOMP? Which total toxic
organics does the TOMP account for? How do you document compliance with the
TOMP?
•	Are running rinses used? Countercurrent? Any still or dead rinses used? Spray rinses or
fog rinses? Discharged to where?
•	Is there any water reuse within the plant? Pretreatment? Any water cooled machinery?
Discharge to and volumes? Does the facility use any cooling water? Volume and ultimate
destination?
•	How is process wastewater from the plating room channeled to the treatment plant or
sewers? Are there floor drains in the plating area? Are floors washed down regularly? Are
domestic and process wastewater segregated (and cooling water, if applicable)? What is
the discharge location for dilution streams? Do representative sampling points exist?
•	When did plating operations begin? If the facility is subject to Part 413, were there any
metal finishing operations added to the facility after initial construction?
•	Is the facility an independent job shop? Or are the materials being process owned by
company?
•	Is the plant manager aware of how much plating is done in terms of surface area (square
feet, etc.)?
•	Printed Circuit Board Manufacturing. What type of Printed Circuit Boards are being
manufactured. Is silk screening and/or photo developing involved in Printed Circuit Board
Manufacturing? What is the purpose of the board? What individual operations are present
(i.e., silkscreen, etching, etc.)? What metals are being plated? What other metal bearing
solutions are present in process tanks or from other chemical solutions in operations at
the facility? Describe. Are only metals complexed with cyanide? Explain. If masking is
employed, are photographic processes involved?
Explosives
•	What are the products manufactured at this facility?
•	Does the facility blend these products into end-use products?
•	Is ammonium nitrate used in the product and, if so, how is it monitored for in the
wastewater?
•	Does the facility have a disposal area for obsolete, off-grade, contaminated, or unsafe
explosives and propellants?
•	Are the products produced for private sector usage or military usage? Are there any
security clearances necessary to enter the facility?
•	Check the general questions for Solids Disposal.
Fiberglass Insulation
•	What methods are used to bind and cool the glass after it has been drawn into fibers?
What wastes are generated from this phase? Are these wastes sewered or pretreated
prior to discharge?
119

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	What method is employed for collecting the glass fibers (i.e., wire mesh conveyors, flight
conveyors, etc.)? What wastes are generated from this phase? Are these wastes
sewered or pretreated prior to discharge?
•	What methods are used to clean the conveyors of any glass fibers? Is this process shut
down or in service while cleaned? What type of cleaning agent is used? Is the
wastewater sewered?
•	Are wet air scrubbers used? Is wastewater sewered or pretreated first (i.e., sedimentation
for particulates matter)?
•	How are backings applied (if applicable)? Heat? Adhesives?
•	Any segregation of domestic and process wastewater?
Food Processing
•	What are the products processed at this facility? What is the production rate?
•	Does the facility use flow equalization prior to discharging into the sewer? Does the
facility have any provisions to respond to a produce spill into the wastewater system?
•	Does the facility generate any by-products which have associated wastewater?
•	Is there any coloring added to the product? Is there any treatment for removal of the
color?
•	Check for the usage of chemical cleaners for equipment washdown. Acids (e.g., muriatic,
sulfuric, phosphoric, and acetic), surfactants, caustic soda, soda ash, and phosphates are
commonly used as cleaners. How are these materials stored?
•	Check the floor washdown procedures. Are equipment and floors washed down with
water?
•	What is the water consumption rate of the operation (total gallons per day and by number
of pounds of product or pounds of material processed)? How much water is generated by
or incorporated into the product?
•	What percent of water use is recycled? Does this include any uncontaminated water (for
refrigeration, machinery, etc.)?
•	What kind of containers does the facility use to package the product? Are containers
made on site? Are they washed or sterilized?
•	Are any types of processing brines used? Are they sewered? What is volume?
•	Are large remains of processed food stuff ground up and sewered? Any attempt to restrict
solids to sewer?
Fuel Oil Dealers
•	Record storage capacity (above or underground).
•	Is above-ground storage diked? Is there any leakage access to storm or sanitary sewer?
•	Are any oils or fuels stored inside building - proximity to floor drains?
•	What type of absorbent is used for spills? How much is stored - proximity to floor drains?
•	Does the facility have a spill prevention plan? Do employees receive spill plan training?
120

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
Funeral Services
•	Embalming room chemical usage - how much formalin? What percentage of usage is
discharged to sewer? How much blood discharge/day? What is its destination? Any other
chemicals involved in embalming process?
•	Chemical storage (floor drains).
•	Embalming table - washing and cleaning procedures - detergents and disinfectants used.
•	How are infectious wastes disposed of?
Gasoline Service Stations
•	Waste oil storage - Is there a waste oil receptacle?
* Drums or tanks - proximity to floor drains?
•	Parts degreasers - solvents used - how are they disposed of?
•	Fluids storage (transmission, brake, anti-freeze, etc.) - proximity to drains?
•	Look for drain trough under service bays - is drain connected to sanitary drain?
•	Presence and description of gas/oil interceptor.
•	How is water removed from gasoline tanks?
Gum and Wood Chemicals Manufacturing
•	What volume of product is produced on a yearly basis?
•	If gum resin, turpentine, or pine oil are produced, what is the volume of process
wastewater from stripping, vacuum jet stream condensates, and unit washdown?
•	If tall oil resin, pitch, or fatty acids are produced, what is the volume of wastewater from
the acid treatment system, overflow from the evaporative cooling system, process wash
downs, and quality control lab wastes?
•	Check the General Industrial Inspection Questions for Cooling Water.
•	If essential oils are produced, what is the volume of contaminated condensate that is
discharged from the batch extraction of oil of cedar wood?
•	If resin derivatives are produced, what is the volume of wastewater from the water of
reaction; sparge stream, if used; and the vacuum jet stream?
Hospitals
•	General layout of facility - types of labs, x-ray equipment, morgue, laundry, food services,
etc.
•	Chemical usage and storage - quantities and destination, proximity to floor drains.
•	Are there any special procedures for handling hazardous or infectious wastes? Names of
any haulers picking up such wastes? Are waste hauler manifests being kept in
accordance with state and federal laws?
•	Cleaning procedures - types and quantities of cleaners and germicides utilized.
•	Is there any routine washdown of the work area(s)?
121

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Is there any vehicle washing at this facility?
•	How is routine disposal of HW handled? Volume procedures? Records adequate?
•	Disposal of spent photo processing chemicals (i.e., fixer) from x-ray departments.
•	Check the General Industrial Inspection Questions for Radioactive Materials.
•	Are decontamination showers present (in case of a chemical spill or terrorist attack)?
•	Are they plumbed to the sanitary sewer? (They should not be.)
•	How is this waste disposed of? (There are normally only a few hospitals in an area
designated to take victims of a chemical spill or attack. These showers are often found in
or near the morgue. There should be a holding tank with a means for pumping this to a
hauler.)
Inorganic Chemicals
•	What is the product that is manufactured at this facility?
•	Are any brine muds generated by the facility's production or inorganic compounds? Do
these brines contain any known heavy metals? How are these brine muds disposed of?
•	Does the facility generate any air scrubber wastewater? What is the chemical quality of
this water and how is it disposed of?
•	Are any cyanide (CN) compounds generated by the facility? Are the CN wastestreams
segregated and/or pretreated prior to discharge?
•	Check the General Industrial Inspection Questions for Cooling Waters.
•	Check the General Industrial Inspection Questions for Solids Disposal.
Institutions (large) (see Universities)
Laboratories
•	What type of laboratory operations are conducted (medical, research, analytical)? Which
areas have water and/or chemical discharges? What are operations generating
wastestream?
•	Is any wet chemistry performed?
•	Which areas use solvents in their processes?
•	Is routine glassware washed or disposed. Any glassware acid washed? Discharge to
sanitary sewer?
•	How are spent or contaminated chemicals handled?
•	Routine washdown of work area?
•	Check the General Industrial Inspection Questions for Radioactive Materials.
Laundries
•	Is dry cleaning done? If so, what is the solvent?
•	Is sludge generated? Disposal?
122

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	If solvent is used, is it redistilled on-site? Does this generate uncontaminated cooling
water? Where is it discharged?
•	Do washers have lint traps, settling pits?
•	How many pounds of laundry are washed per day?
•	What is temperature of effluent? Is heat exchange system used?
•	Are printer's rags, shop rags, or other industrial materials cleaned?
•	What types of detergents and additives are used? What is pH of effluent?
•	Are laundry trucks maintained and washed on site? If so, how are waste oils, etc.,
handled? Any floor drains leading to sewer in the vicinity of vehicles?
•	Any boiler blowdown - volumes, frequency of discharge? Are there any additives such as
chromates? Where does discharge go?
•	Any loss due to evaporation? Volume estimate?
•	What is water consumption, source of water?
•	Does appropriate sampling point exist?
•	Is there separation of process wastewater and domestic wastewater?
•	Is the water reclaimed? If so, what is the volume of water and how is it used?
•	Is dry cleaning performed at this facility? If so:
•	What type of solvent is used? Tetrachloroethylene (perc), hydrocarbon, silicone,
Stoddard
•	If perc, how is separator wastewater managed?
•	Copy of disposal records?
•	Receipts for new perc purchases?
•	Are new and used perc containers stored near floor drains?
Leather Tanning and Finishing
•	What method was used to preserve the received hides? (Note: If sheepskins or goatskins
are tanned, there will be a separate solvent or detergent degreasing operation.)
•	What types of skins and/or hides are tanned? (Note: If sheepskins or goatskins are
tanned, there will be a separate solvent or detergent degreasing operation.)
•	Is hair saved or pulped (i.e., chemically dissolved)? (Note: In a save hair operation with
good recovery of hair, the contribution to the effluent strength is substantially lower than
in the pulp hair operation.)
•	Is deliming accomplished by treating with mild acids or by bating? What is the destination
of these wastes?
•	What types of tanning are used? (Note: Chrome and vegetable tannins are the most
common. A combination of tannins may also be used.)
•	How is chromium discharged into the sewer controlled?
123

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Are chemicals stored near floor drains? (This is a very appropriate question to ask since
many liquid chemicals are used in the leather tanning industry.)
•	How is sulfide controlled?
•	Are tannins recycled and/or chemically recovered?
•	Any pretreatment units employed?
•	If sludge is generated, how is it disposed of?
•	Any water cooled machinery used? Discharge to?
•	Any boiler blowdown to sewer frequency and volume? Any additives such as chromates?
•	Any segregation of domestic and process wastewater?
•	Does a representative sampling point exist?
Lumber and Building Materials: Retail
•	Storage of paint, thinner and other solvents, adhesives (glue), roofing materials (tar).
*	Proximity to floor drains.
•	Paint mixing (dry or does it involve water - sinks?).
*	Possibility of spillage, cleanup.
•	Cutting machinery - water cooled, oil lubed, possibility of spillage, destination of spills and
cooling water.
Machine and Sheet Metal Shops
•	What type of product is manufactured?
•	What kind of material is machined?
•	Are coolants and/or cutting oils used and are they water soluble?
•	Are hydraulic oils used?
•	Would any of these coolants/oils ever be discharged to the sewer? If yes, what
frequency? What volume? Where does the discharge occur? If no, how are spent or
contaminated materials handled? Who is the hauler? Are they recycled? Where?
•	Are any degreasing solvents or cleaners used? What are the chemical make-up and/or
brand names of the degreasers and how are they used? How are the spent degreasing
chemicals or sludges disposed of? Is degreasing rinse water discharged to the sewer?
•	Is there any water cooled equipment such as a vapor degreaser or air compressor? If
yes, is the unit water cooled (how-many passes? one-pass not allowed) on a cooling
tower or refrigerant type? Where is it discharged, frequency, volume?
•	Is any painting done on the premises? How are waste thinners or paints disposed of? Is a
water curtain used for control of solvents entering the air and is contaminated water
discharged?
•	Is any type of metal finishing done, such as anodizing, chromating, or application of a
black oxide coating or an organic dye? What are the chemicals used, volumes
consumed, and destinations of the finishing chemicals?
124

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Are there any floor drains where any of the chemicals and oils are stored and used? Any
routine wash downs of the work area(s).
•	What is water consumption?
•	Are there any pretreatment units, traps, etc.?
•	Any segregation of domestic and process wastewater?
•	Any representative sampling points?
Meat Products/Poultry Products
•	What types of livestock are slaughtered and/or processed?
•	What are the principal processes employed?
•	What methods are used to dehair? Is the hair recovered from the wastewater stream?
•	Does the facility cure hides? What brine solution is used specifically (i.e., sodium
chloride)? Are hides cured in vats? Are vats ever discharged to the sewer? Frequency
and volume?
•	What are the by-product processes?
•	Is rendering practiced at the plant? What type of process is used? Is the resulting
wastewater treated or sewered?
•	Is grease and solids recovery practiced? How (i.e., catch basins, grease traps, air
flotation, etc.)? How often are these systems cleaned out?
•	What methods are used for clean-up operations? What detergents are used (i.e., caustic,
alkaline, etc.)?
•	Which wastewater streams, if any (i.e., uncontaminated water) bypass all treatment and
discharge directly to a receiving water or municipal plant?
•	Any boiler or water tower blowdown to sewer? Frequency and volume? Any additives?
•	If poultry, how are feathers removed? Disposal? How are chicken parts (innards)
disposed of? Blood?
•	Is domestic wastewater segregated from process wastewater?
•	Any representative sampling point?
Metal Heat Treating Shops
•	Are cyanide salts used in heat treating?
•	What kinds of metal are heat treated?
•	What fluids are used for quenching metals? Are these ever changed and discharged to
the sewer?
•	Are sludges ever removed from the quenching tanks? How are the sludges disposed of?
•	Is any of the metal cleaned before or after heat treating? Are any degreasing solvents or
cleaners used and how are they used?
•	Are there any water cooled quenching baths, vapor degreasers or other equipment?
Discharge to? Volume?
125

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Are there any floor drains in the work or chemical storage areas?
•	Any boiler blowdown, frequency and volume to sewer? Any additives?
•	What is water consumption?
•	Is domestic and process wastewater segregated?
•	Any representative sampling points?
Metal Refineries and Foundries
•	What is the product that is manufactured at the facility?
•	Does the facility use any solvents or degreasing agents? Check the General Industrial
Inspection Questions for Solvents.
•	Does the facility use any cooling water? Check the General Industrial Inspection
Questions for Cooling Waters.
•	Is there any water recycle/reuse within the plant? Does the plant employ any
pretreatment for the recycle streams?
•	Does the facility have a spill prevention plan developed? Does the plan include spills to
the sewer of highly acidic or caustic materials?
•	Check the General Industrial Inspection Questions for Solids Disposal.
Military Installations (see Universities)
Nursing Care Facilities
•	Food service (see restaurant questions).
•	Any chemical usage (lab facility)?
•	Janitorial chemicals - usage, destination and storage of germicides and disinfectants.
•	What is the frequency and amount of high pressure boiler blowdown?
•	What additives are used? To where discharged?
•	Any use of disposable wipes? How are those wipes discarded?
Organic Chemicals
•	Are processes batch or continuous?
•	If batch processes are used, how frequent is clean-up and what is done with wastes?
•	Are waste disposal services used? If so, for what wastes? Are they licensed? Are
required manifest records maintained?
•	What types of solvents are stored in bulk?
•	What are the sources and points of discharge for cooling waters? Are these contaminated
or not contaminated? Is there an NPDES permit for discharge to surface waters?
Paint and Ink Formulation
•	Are oil-base or water-based inks manufactured?
•	What types of inks are made?
126

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	What type of paints are manufactured? Water or solvent based?
•	What are the pigments made of?
•	Are extenders used?
•	Are biocides added? Mercury?
•	Are solvents used? If so, what are they?
•	What are the resin types?
•	What other ingredients are used in formulating the product?
•	Describe how oil-based equipment is cleaned. Describe how water-based equipment is
cleaned.
•	Is there any discharge to the sewer system (washdown) and/or bad batches? Are any
chemicals used to clean production equipment?
•	Are there any floor drains in chemical storage and mixing areas?
•	Is there a scavenger service? If so, for what wastes?
•	Is there on-site disposal of solids by burial?
•	Any water cooled machinery used? Where is cooling water discharged to?
•	Any boiler blowdown to sewer, frequency, volume, additives?
•	Is process wastewater segregated from domestic?
•	Any representative sampling points?
Paper Mills
•	What are the products manufactured at the plant?
•	Which specific chemicals are used in the process?
•	Is pulp bleached? If so, what is the process and what chemicals are employed?
•	Are any chemicals manufactured on-site? (Chlorine dioxide, hypochlorites, etc.) - any
discharged from these operations?
•	Any recovery systems? (White water recycle, cooking liquor regeneration, cooling water
reuse, etc.)
•	Where is cooling water used in the plant? (Condensers, vacuum pumps, compressors)
Where is it discharged?
•	Describe the types of size, fillers, coatings, finishes, etc., in paper making.
•	What happens to bad batches, or liquids in case of equipment failure? (To the sewer or
treatment plant?)
•	How is sulfide controlled?
•	How much water is consumed, on the average? Source of water?
•	Any boiler/water tower blowdown, frequency, volume, additives?
•	Any representative sampling points?
127

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Is domestic wastewater segregated from process wastewater?
Paving and Roofing
Tar and Asphalt
•	Does wastewater from wet air scrubbers used on the oxidizing tower discharge directly to
the sewer? Is it created and recycled?
•	What method(s) are used to control the temperature of the oxidizing tower (i.e., water)? Is
this water discharged or recycled?
•	What treatment methods are used to remove suspended solids or oil from wastewater
(i.e., catch basins, grease traps, sedimentation, oil skimmers)?
•	Is water or air used to cool asphalt products? If water, is it contact or noncontact? If
contact, is this water discharged directly to sewer (Note: mist spray used alone causes
the largest amount of solids present in waste-water.)
•	Any water cooled machinery used? Where is cooling water discharged?
•	Are solvents used/stored? Any floor drains nearby?
•	Any boiler blowdown, to sewer? Frequency, volume additives?
•	Is process wastewater segregated from domestic wastewater?
•	Representative sampling point?
Pesticides (including Agricultural Chemicals)
•	Does the facility manufacture, blend, package or repackage pesticides at this location?
•	What pesticides are manufactured, formulated, packaged or repackaged at the facility?
What volumes of product is produced on a yearly basis?
•	Check the chemical storage areas and types of containers used.
•	How are chemical containers rinsed? Is the rinse water discharged to the sewer?
•	What is the volume of wastewater from the final synthesis reaction or the dilution water
step used directly in the process?
•	Check the procedures for floor and/or equipment washes.
•	Check the General Industrial Inspection Questions for Solids Disposal.
Petroleum Refining
•	What are the processes employed by the facility and what is the throughput (in barrels
per day) of each of the following processes:
Topping: The term includes basic distillation processes;
Cracking: The term cracking includes hydrocracking, fluid catalytic cracking, and moving
bed catalytic cracking processes;
Petrochemical: This includes the production of second generation petrochemicals (i.e.,
alcohols, ketones, cumene, styrene, etc.), first generation petrochemicals, and
isomerization products (i.e., BTX, olefins, cyclohexanes, etc.) and
128

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
Lube: This term includes hydrofining, white oil manufacturing, propane dewaxing, solvent
extractions and dewaxing, naphthenic lubes, phenol extraction, SO2 extraction, etc.
•	Identify the location of any oil interceptors or separators. What kind of unit is it and what
is the general operating condition of the unit?
•	Does the facility employ any biological treatment prior to discharging to the sewer?
•	Are there any controls in place for phenols, sulfides, hexavalent chromium, and/or
ammonia? How does the facility dispose of any spent caustic which it might generate?
•	Is storm water runoff isolated from the sewer discharge? How is the contaminated storm
water runoff disposed of? Does the facility have an NPDES permit for stormwater?
•	Check the General Industrial Inspection Questions for Cooling Waters.
•	Check the General Industrial Inspection Questions for Sludge Disposal.
Pharmaceuticals Manufacturing
•	What type of processes are used to manufacture product(s)? (Fermentation, biological
and natural extraction, chemical synthesis, mixing/compounding, and formulation.)
•	If processes include fermentation and/or chemical synthesis, are these continuous or
batch-type operations?
•	If chemical synthesis is involved, what processing steps (crystallization, distillation,
filtration, centrifugation, vacuum filtration, solvent extract, etc.) produce wastewaters? Are
these wastewaters discharged to the sewer system?
•	Are any of the "regulated organics" used or generated in the manufacturing process?
•	What types of solvents are used, if any? How are spent solvents disposed of? How
stored? Floor drains nearby?
•	Any detergent cleaning or acid cleaning of tanks or vessels? Any disinfectants used?
Discharged to sewer?
•	Is raw water intake purified? If yes, by what method - ion exchange, reverse osmosis,
water softening, etc.? What types and volumes of wastes are generated? Frequency of
discharge?
•	What is done with the spent beer generated by fermentation?
•	Regarding equipment and floor washdown - are any chemical cleaners used? What is
frequency? Volume of water used? Destination of wash water?
•	Is there any chance of spills or batch discharges? Spill plan?
•	Does any equipment, such as condensers, compressors, and vacuum pumps, require the
use of once-through uncontaminated cooling water? If so, where do these waters
discharge?
•	Is there a research lab in the plant? What are the wastes generated in the facility? How
controlled?
•	Is process wastewater segregated from domestic wastewater?
•	Any representative sampling point?
•	Has certification statement been submitted?
129

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
Photographic Processing
It is important to determine what type of chemistry is used because some of the chemicals may
be toxic while others may not.
•	What types of films are developed? Are prints made? Give an estimate of how much total
processing is done per day? How many automatic processors are utilized and how long
are they in operation per day?
•	Are automated processors used or is work done manually?
•	What chemical brands are used: Kodak, 3M, GAF, etc.? What type of process chemistry
is used: C-41, E-6, CP-30, etc.? What are the names of each chemical used in each
process, what are the volumes used, and which chemicals discharge to the sewer? Do
any of the chemicals used contain cyanide?
•	Is silver recovery practiced? Is bleach regeneration practiced, and, if so, is it done within
the lab? What are the processes and wastes involved?
•	What is the wastewater flow from each of the photographic processing operations? Does
the rinse water on the processors run continuously or is it shut off when no work is
processed? How often are the processors cleaned and the chemicals changed? What
chemicals, if any, are used to clean the processor rollers and trays? Are there any floor
drains where the chemicals are mixed or stored?
•	Any pretreatment? pH control?
•	What is water consumption?
•	Is process wastewater segregated from domestic?
•	Any representative sampling point?
Plastic and Synthetic Materials Manufacturing
•	What is the product manufactured?
•	What are the raw materials used including any accelerators and inhibitors? Are any
known toxics (such as cyanide, cadmium, or mercury) utilized in manufacturing the
product?
•	Are there any product washing operations? Are reactor vessels washed down between
batches? Is water or solvent used? Would these wastes be discharged to the sewer?
•	What type of polymerization process is employed? Does the process use a water or
solvent suspension? What are the wastes generated from the process; what are the
possible contaminants; how are the wastes disposed of?
•	Is cooling water, heating or steam used and is it contact or noncontact? What is the
destination of these streams?
•	Any boiler blowdown to the sewer - frequency, volume, additives?
•	Is there segregation of domestic and process wastewater?
•	Any representative sampling point?
Porcelain Enameling
•	What is the square footage of material enameled at the facility on annual basis?
130

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	How is the base metal prepared for enameling?
•	Is any electroplating done on-site? If yes, check the questions for Electroplating and
Metal Finishing.
•	What coating application method is used?
•	Check the General Industrial Inspection Questions for Usage of Chemicals, Cleaners and
Location of Drains.
Printed Circuit Board Manufacturer (see Electroplater and Metal Finishing)
Printing
Some of the following questions may apply while others may not; experience will be the best
judge.
•	What kind of printing is done: offset, letterpress, silkscreen or other type of printing?
•	If offset printing is done: Is film processing and plate developing done in the shop?
•	If film processing is done: Is an automatic film processor used or are trays used? Does
the processor's rinse waste run continuously or does it shut off after processing is
completed? How often are the processor's chemical tanks cleaned out and what volume
is discharged to the sewer? How much developer, fixer, and stop bath (if applicable) are
used and are these discharged to the sewer? Is silver reclamation practiced? Is cyanide
used at all for further reducing negatives? Are phototypositors used and, if so, what
chemicals are discharged?
•	If plate developing is done: What type of plates are used? If they are aluminum plates,
are they developed with a subtractive color key additive developer? What are the names
of the developers and what quantities are used? Is the developer washed off the plates to
the sewer or wiped-off with a rag? How many plates are developed?
•	If paper plates are used: What type of processor is employed and what are the names,
volumes, and destination of the chemicals used? If a silver process is used, is silver
reclamation practiced?
•	In the press room, what type of fountain solution is used and would this ever be
discharged during normal use or cleanup operations? What type of solvent is used to
clean the presses and how is this applied? Would this solvent ever be discharged or does
it become associated with rags? Are these rags washed on the premises or are they
picked up by a commercial laundry? What is the name of the laundry? Are there any floor
drains where the solvent or ink is stored? Are any of the presses water cooled? Are there
any waste oils from the presses?
•	If letter pressing is done: Is old lead type smelted in the shop and, if so, are the molds
water cooled? What type of solvent is used to clean the presses and type? How is solvent
applied; is it ever discharged to the sewer?
•	If silkscreen printing is done: What kind of photosensitive coating and what volume is
used? What kind of developer is used and is it discharged? Is a solvent or other cleaner
used to clean the screen after printing? Is this discharged to the sewer? Are the screens
used over again for making new stencils or are they thrown away?
131

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	If a different type of printing is done, what kind is it, and what are the names and volumes
of the chemicals used? Are these discharged to the sewer or collected and disposed of?
Who would pick up the collected chemicals?
•	Does rinse water from the processors or in the manual rinse operation run continuously,
or is it shut off when no work is processed?
•	Any water cooled machinery used? Discharged to?
•	Is process wastewater and domestic wastewater segregated?
•	Any representative sampling points?
Restaurants
•	Presence of grease interceptor (describe, size). How is it serviced (frequency)? How is
grease disposed of?
•	What is done with spent cooking grease? Amount generated?
•	How does the facility dispose of edible garbage material?
•	Janitorial cleaners (types, usage, storage).
•	Do they have an automatic dishwasher? (Hours/day usage, water consumption,
discharge water temperature.)
* Is it connected to grease interceptors?
•	Number of sinks - usage of sinks (pots and pans or hand washing).
•	Grill cleaning residual destination.
Radiator Shops
•	Any boil out (caustic stripping) tanks? Volume of tanks? Temperature of tanks? What
chemicals are added to the boil out tanks? How often is the boil out tank dumped? Is it
treated before it is dumped? How is sludge from tanks disposed? How frequently?
•	Any ultra-sonic cleaning?
•	Any rinse booths or baths? What is the source of the rinse water - fresh water in a once-
through system? Wash water from a booth recirculation reservoir? Treated wastewater?
Volume of rinse water contained in booth or bath units? How often is booth or bath
dumped? Is it treated before it is dumped?
•	Any test tanks for leak testing purposes? Volume of tanks? What chemicals are added to
the tanks? Is soldering done over the test tank? Is sludge removed from tank? How often
is tank dumped? Is it treated before it is dumped?
•	Any painting of the radiators? If so, water based or solvent based paints? What is done
with waste paint and solvents? Any discharge from paint booth to the sanitary sewer
system?
•	Are radiators drained thoroughly before transferring them from one tank to another?
•	Any drain boards between tanks to divert drippings back into the source tank?
•	Any kind of treatment system to treat wastewater before discharge or to allow for water
reuse?
132

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Any solvents used? What is done with spent solvents? What volume of solvents are
disposed?
•	Floor drains? Do they go to the sanitary sewer? What type of wastes do they receive?
Does floor cleaning waste go down floor drains? Are any drains sealed or bermed?
•	Any spill prevention measures implemented?
•	Is solder dross generated at the facility? Where is it stored? How is it disposed of?
•	What type of waste sludges are generated? Are they dried or dewatered? Where are they
stored? How are they disposed of?
Rubber Processing
•	Synthetic or natural?
•	What are the products manufactured?
•	Is the rubber natural or synthetic?
•	If synthetic rubber is used, is it polymerized on-site and would it be a water or solvent
suspension? Is there a discharge associated with the process?
•	What are the ingredients of the rubber, including all additives? What kind of anti-crack
agents are used? Are any known toxics used in the plant?
•	Are there any waste oils from rubber mixers or other processes which require disposal
and, if so, how are they disposed of?
•	What type of forming process is used? Is cooling water contact or noncontact? Is it
recirculated or discharged? If contact cooling water is used, is it treated in any way before
discharge? What contaminants would be in the water?
•	Is there any wastewater associated with the curing process (e.g., steam condensate),
and what would the contaminants be?
•	Is rubber reclaimed and, if so, what type of process is used? Are any chemical agents
used and how are these disposed of when spent?
•	Are any final coatings applied to the rubber, paint, plastics, etc.? Are there any wastes or
wastewater associated with the process and how would they be disposed of?
•	Does the plant have air pollution control equipment? Does it use water as a scrubbing
medium and would this be discharged?
•	Any liquids stored? Near floor drains leading to sewer?
•	Any water cooled machinery? Discharge to, volume?
•	Water consumption?
•	Any boiler blowdown to sewer - frequency, volume, additives?
•	Are process and domestic wastewater segregated?
•	Any representative sampling point?
Schools
•	Elementary Schools
133

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
*	Cafeteria (see restaurants).
*	Janitorial chemicals - usage, destination, storage.
•	Junior High Schools
*	Cafeteria (see restaurants).
*	Janitorial chemicals - usage, destination, storage.
*	Labs - chemical usage and disposal practices.
*	Art department - note any agents disposed of to the sewer (amounts) - paint, thinner.
*	Wood/Metal shop-solvents, paint, stain usage, destination, storage, access to floor
drains.
•	High Schools
*	Same as Junior High Schools, plus:
*	If vocational, check - auto mechanics department; cosmetology department - note any
chemical usage and disposal practices.
Scrap and Waste Materials
•	Any processing of the material - welding or smelting of metals?
*	Processing machinery cooling water - contact or noncontact - frequency of discharge.
•	Oil Storage - describe, including capacity.
•	Any other liquid storage or reclamation?
Soap and Detergent Manufacturing
General
•	Are only soaps manufactured, detergents, or both? Classify the plant.
•	Is foaming a problem in POTW sewers or treatment plant?
•	How is cooling water used? Discharge to?
•	How are liquid materials stored? Floor drains nearby leading to sewer?
•	Are air scrubbers used? Do these use water? Caustics?
•	In product purification steps, how are filter backwashes handled?
•	Are process and domestic wastewater segregated?
•	Any representative sampling points?
•	What is the basic process employed for manufacturing soap: batch kettles? Fatty acid
neutralization? Other?
•	Is process batch or continuous? If batch, what is frequency and volume of reactor
cleanout?
•	Is waste soap from processing sewered?
•	Are defoamers added prior to sewer discharge?
134

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Are perfumes and additives used? If so, what are they?
Detergent
•	What are additives used in the product?
•	How are spray drying towers cleaned?
Sugar Processing
•	Are both liquid and crystallized sugar produced?
•	What type of system exists in the plant for "sweet water" recovery?
•	Are ion exchange systems used? If so, what are the backwashing systems likely to
produce as wastes? How frequent is backwash?
•	If charcoal filtering systems are used, does any wash waters or transport water go to the
sewer?
•	Are trucks or other heavy equipment maintained? Washed? Any floor drains leading to
sewers? Any traps?
•	What bulk chemicals are stored and how? (Examples are acids used in liquid sugar
production.)
•	What happens to filter sludges in the plant? What type of filter aids are used?
•	Is cooling water used? Discharge to?
•	What is the frequency of boiler blowdown and what are the additives used and volumes
discharged?
•	From cleaning of equipment, what wastes are sewered and what wastes are recycled
through the plant? (Examples are filters, evaporation pans, screens, etc.).
•	Are process and domestic wastewater segregated?
•	Any representative sampling points?
Textile Mills
•	What are the products manufactured in the mills? What is the approximate production of
the mill?
•	What types of fibers are used in the fabric?
•	Does the raw fiber require cleaning before spinning and weaving?
•	Are the fibers or fabrics scoured, mercerized, fulled, carbonized, or bleached? What
chemicals and rinsing operations are used and what is the destination of these wastes?
•	Is any kind of sizing applied and, if so, what kind is it?
•	Is desizing practiced, and what are the chemicals used? Are these chemicals discharged
to the sewer?
•	Is dye applied to fabrics? What are the types and chemical constituents of the dyes and
are the spent dye solutions and rinse waters discharged to the sewer?
135

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Are any antistatic agents applied to synthetic fibers before spinning and weaving
operations? Would these be removed from the fabric and subsequently enter the
wastewater discharged to the sewer?
•	Are any further finishing operations practiced, such as printing or application of various
coatings?
•	What is the volume of wastewater generated by each chemical process?
•	Are there any methods of pretreatment employed before discharge of wastewater to the
sewer?
•	Any water cooled machinery used? Discharged to?
•	Any liquids stored near floor drains leading to sewer?
•	Any boiler blowdown to sewer - frequency, volume, additives?
•	Are process and domestic wastewater segregated?
•	Any representative sampling point?
Transportation Equipment Cleaning
•	Are tanker trucks, rail cars or barges/tankers cleaned (interior)?
•	What types of commodities were contained in tanks (chemicals, petroleum products,
food-grade products, etc.)?
•	Are manifests available to identify cargoes last contained in the tanks?
•	Is the facility currently permitted for the types of commodities actually received?
•	Is discharge >100,000 gallons per year?
•	Is the facility subject to numerical effluent limitations, or has the facility elected to comply
with a Pollutant Management Plan in lieu of numeric effluent limitations?
•	How is heel managed?
•	How are spent cleaning solutions, caustic washes, and acid washes managed?
•	Are cleaning agents they being recycled or reused?
•	Are procedures in place to properly train employees on aspects of the Pollutant
Management Plan?
Universities (or Military Installations and Other Large Institutions)
•	Is a map of the campus available to inspectors which details the site and includes all
building, roads, plus water and sewer lines? Is there some way to identify all of water
meters associated within institution?
•	Can a master list of chemicals used on campus be provided? Which chemicals are used
most?
•	Is there an organized waste chemicals pickup program? How many pickups per year?
How many gallons picked up per year? Who is scavenger(s)? Licensed? Frequency of
scavenger pickups? Central storage location(s) for waste chemicals that have been
picked up? Are required manifest records maintained?
136

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
•	Are radioactive materials handled on campus? If yes, in what capacity? Are any wastes
generated? If yes, how are these wastes disposed of? Check General Industrial
Inspection Questions for Radioactive Wastes.
•	Any photo developing, or graphics arts facilities on campus? Any printing facilities?
•	Any laundry/ facilities? Describe.
•	Any photo type PC board work in the electronics labs on campus?
•	Any metal finishing or metal working done on site? Explain.
•	Any auto mechanics, maintenance, washing, etc. Describe. Are alkaline cleaning or acid
cleaning tanks present? Discharged to sewer? Sludge Handling Practices?
•	Any woodworking, carpentry, painting, paint booths, or water curtains? Describe.
•	Any eating or dining facilities? Grease interceptors?
•	Describe routine handling of herbicides and pesticide residuals and empty contains.
•	Describe Hazardous Waste (HW) storage and treatment.
•	Any hospitals, clinics, etc. Describe.
•	Any laboratories? Describe.
•	How are pathogenic organisms disposed of?
•	Any pretreatment facilities (marble chip acid traps, dilution pits, etc.)?
•	How much water is consumed per year?
•	Has a study been done to account for all water uses? Any use of steam generation?
Blowdown? Any cooling water in use? Describe. (Cooling water, laboratory wastewaters,
cooling tower and boiler blowdowns, evaporation and drift from cooling towers, lawn
irrigation, etc.) Describe sources.
•	Which and how many of each of the following units, that usually discharge
uncontaminated water to the sewer, does the university have in operation at various
times: stills, cold rooms, diffusion pumps, centrifuges, electron microscopes, x-ray
diffraction units, electrophoresis units, air compressors, ice machines, fermentors.
•	What is total campus population, including employees? How many reside on campus?
•	Are there floor drains near liquid chemical storage areas (such as building and grounds,
chemical "supermarkets," waste chemical storage area(s), fuel oil tanks)?
•	Does the site have any active or inactive NPDES permits?
Veterinary Services
•	What is the chemical usage and storage; quantities, destination, floor drain proximity?
* Alcohol, germicides, pesticides, cleaners, medicines?
•	Are there washing baths; detergents used and discharge procedures, any hair clogging
problems?
•	What is done with excreta material (animal boarding)?
•	Are there any special procedures for infectious wastes?
137

-------
Industrial User Inspection and Sampling Manual
Appendix B. Industry Specific Questions
Woodworking Shops
•	Chemical usage - look for solvents, thinners, paints, stains, cutting oils, adhesives, etc.
•	Disposal procedures for chemical wastes.
•	How are brushes cleaned? Are any spray guns used - how are they cleaned?
•	Chemical storage - proximity to floor drains.
•	How is cutting machinery lubricated and cooled?
*	Are cutting oils discharged?
*	Any cooling water (contact or noncontact) recirculated or discharged?
138

-------
Industrial User Inspection and Sampling Manual Appendix C. General Operations and Maintenance
Questions
Appendix C.
reneral Questions:
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Organization:

Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
Yes
No
N/A
General Operations and Maintenance Questions
Operations and Maintenance Questions for Industrial Users
Policies and Procedures:
1.	Is there a formal or informal set of policies for facility operations?
2.	Do policies address any of the following:
•	Remaining in compliance?
•	Maintaining process controls?
•	Quality control?
•	Preventative maintenance?
3.	Is there a set of standard procedures to implement these policies?
4.	Are the procedures written or informal?
5.	Do the procedures consider the following areas?
•	Safety?
•	Emergency?
•	Laboratory?
•	Process control?
•	Operating procedures?
•	Monitoring?
•	Labor relations?
•	Energy conservation?
•	Collection system?
•	Pumping stations?
•	Treatment processes?
•	Sludge disposal?
•	Equipment record system?
•	Maintenance planning and scheduling?
•	Work orders?
•	Inventory management?
6.	Are the procedures followed?
1.	Is there an Organizational Plan (or Chart) for operations?
2.	Does the plan include:
•	Delegation of responsibility and authority?
•	Job descriptions?
•	Interaction with other functions (such as maintenance)?
3.	Is the Plan formal or informal?
4.	Is the Plan available to and understood by the staff?
5.	Is the Plan followed?
6.	Is the Plan consistent with policies and procedures?
7.	Is the Plan flexible (i.e., can it handle emergency situations)?
8.	Does the Plan clearly define lines of authority and responsibility in such areas as:
•	Laboratory?
•	Process control?
139

-------
Industrial User Inspection and Sampling Manual Appendix C. General Operations and Maintenance
Questions
Yes
No
N/A

• Instrumentation?
Yes
No
N/A

• Sludge disposal?
Yes
No
N/A

• Collection system?
Yes
No
N/A

• Pumping stations?
Yes
No
N/A

• Monitoring practices?
Yes
No
N/A

• Mechanical?
Yes
No
N/A

• Electrical?
Yes
No
N/A

• Buildings and grounds?
Yes
No
N/A

• Automotive?
Yes
No
N/A

• Supplies and spare parts?
toffing:




Yes
No
N/A
1.
Is there an adequate number of staff to achieve the policies and procedures established in the




plan?
Yes
No
N/A
2.
Are staff members adequately qualified for their duties and responsibilities by demonstrating:
Yes
No
N/A

• Certification?
Yes
No
N/A

• Qualification?
Yes
No
N/A

• Ability?
Yes
No
N/A

• Job performance?
Yes
No
N/A

• Understanding of treatment processes?
Yes
No
N/A
3.
Is staff effectively used?
Yes
No
N/A
4.
Has the potential for borrowing personnel been considered?



5.
Are training programs followed for:
Yes
No
N/A

• Orientation of new staff?
Yes
No
N/A

• Training new operators?
Yes
No
N/A

• Training new supervisors?
Yes
No
N/A

• Continuing training of existing staff?
Yes
No
N/A

• Cross training?



6.
Which of the following training procedures are used?
Yes
No
N/A

• Formal classroom?
Yes
No
N/A

• Home study?
Yes
No
N/A

• On-the-job training?
Yes
No
N/A

• Participation in professional conferences or organizations?
Yes
No
N/A
7.
Does the training program provide specific instruction for the following operations and




maintenance activities?
Yes
No
N/A

• Safety?
Yes
No
N/A

• Spill prevention, control and response actions?
Yes
No
N/A

• Laboratory procedures?
Yes
No
N/A

• Treatment processes?
Yes
No
N/A

• Instrumentation?
Yes
No
N/A

• Equipment troubleshooting?
Yes
No
N/A

• Handling personnel problems?
Yes
No
N/A

• Monitoring practices?
Yes
No
N/A

• Handling emergencies?
Yes
No
N/A

• Mechanical?
Yes
No
N/A

• Electrical?
140

-------
Industrial User Inspection and Sampling Manual Appendix C. General Operations and Maintenance
Questions
Yes
No
N/A

• Automotive?
Yes
No
N/A

• Building maintenance?
Yes
No
N/A

• Inventory control?
Yes
No
N/A
8.
Does management encourage staff motivation?
Yes
No
N/A
9.
Does management support its first-line supervisors?



10.
Is staff motivation maintained with:
Yes
No
N/A

• Encouragement for training?
Yes
No
N/A

• Job recognition?
Yes
No
N/A

• Promotional opportunities?
Yes
No
N/A

• Salary incentives?
Yes
No
N/A

• Job security?
Yes
No
N/A

• Working environment?
derations:



Yes
No
N/A
1.
How are operating schedules established?
Yes
No
N/A
2.
Do schedules attempt to attain optimum staff use?
Yes
No
N/A
3.
Are line supervisors included in manpower scheduling?
Yes
No
N/A
4.
Are staff involved in and/or informed of manpower planning?
Yes
No
N/A
5.
Is there sufficient long-term planning for staff replacement and system changes?
Yes
No
N/A
6.
Are there procedures in manpower staffing for emergency situations?
Yes
No
N/A
7.
How are process control changes initiated?
Yes
No
N/A
8.
How do process control changes interact with management?
Yes
No
N/A
9.
How effectively are laboratory results used in process control?
Yes
No
N/A
10.
Are there emergency plans for treatment control?
Yes
No
N/A
11.
Is there an effective energy management plan? Is the plan used?
Yes
No
N/A
12.
To what extent are operations personnel involved in the budget process?
Yes
No
N/A
13.
Do budgets adequately identify and justify the cost components of operations?
Yes
No
N/A
14.
Are future budgets based on current and anticipated operating conditions?
Yes
No
N/A
15.
Do operating and capital budget limits constrain operations?
Yes
No
N/A
16.
Can budget line items be adjusted to reflect actual operating conditions?
Maintenance:
Yes No N/A 1. Are maintenance activities planned? Is the planning formal or informal?
Yes No N/A 2. Does the facility have sufficient management controls to affect realistic planning and
scheduling? If the controls exist, are they used?
Yes No N/A 3. Are operating variables exploited to simplify maintenance efforts?
Yes No N/A 4. To what extent are the supply and spare parts inventories planned in conjunction with
maintenance activities?
Yes
No
N/A
5.
Have minimum and maximum levels been established for all inventory items?
Yes
No
N/A
6.
Does the facility have a maintenance emergency plan?
Yes
No
N/A
7.
Is the maintenance emergency plan current? Is the staff knowledgeable about emergency
procedures?
Yes
No
N/A
8.
Does a plan exist for returning to the preventative maintenance mode following an emergency?
Yes
No
N/A
9.
Are preventative maintenance tasks scheduled in accordance with manufacturer's
recommendations?
Yes
No
N/A
10.
Is adequate time allowed for corrective maintenance?
Yes
No
N/A
11.
Are basic maintenance practices (preventative and corrective) and frequencies reviewed for
cost-effectiveness?
Yes
No
N/A
12.
Do the management controls provide sufficient information for accurate budget preparation?
141

-------
Industrial User Inspection and Sampling Manual Appendix C. General Operations and Maintenance
Questions
To what extent are maintenance personnel involved in the budget process?
Do budgets adequately identify and justify the cost components of maintenance?
Are future budgets based on current and anticipated operation and maintenance conditions?
Do maintenance and capital budget limits constrain preventative maintenance (equipment
replacement and improvement)?
Yes No N/A 17. Does the maintenance department receive adequate feedback on cost performance?
Yes No N/A 18. Can budget line items be adjusted to reflect actual maintenance conditions?
Yes
No
N/A
13.
Yes
No
N/A
14.
Yes
No
N/A
15.
Yes
No
N/A
16.
Management Controls:



1.
Are current versions of the following documents maintained:
Yes
No
N/A

• Operating reports?
Yes
No
N/A

• Work schedules?
Yes
No
N/A

• Activity reports?
Yes
No
N/A

• Performance reports (labor, supplies, energy)?
Yes
No
N/A

• Expenditure reports (labor, supplies, energy)?
Yes
No
N/A

• Cost analysis reports?
Yes
No
N/A

• Emergency and complaint calls?
Yes
No
N/A

• Process control data, including effluent quality?
Yes
No
N/A

• Spill prevention, control and response actions?
Yes
No
N/A
2.
Do the reports contain sufficient information to support their intended purpose?
Yes
No
N/A
3.
Are the reports usable and accepted by the staff?
Yes
No
N/A
4.
Are the reports being completed as required?
Yes
No
N/A
5.
Are the reports consistent among themselves?
Yes
No
N/A
6.
Are the reports used directly in process control?
Yes
No
N/A
7.
Are the reports reviewed and discussed with operating staff?
Yes
No
N/A
8.
What types of summary reports are required?
Yes
No
N/A
9.
To whom are reports distributed and when?
fanagement Controls
(Maintenance):



1.
Does a maintenance record system exist? Does it include:
Yes
No
N/A

• As-built drawings?
Yes
No
N/A

• Shop drawings?
Yes
No
N/A

• Construction specifications?
Yes
No
N/A

• Capital and equipment inventory?
Yes
No
N/A

• Maintenance history (preventative and corrective)?
Yes
No
N/A

• Maintenance costs?
Yes
No
N/A
2.
Is the base record system kept current as part of daily maintenance practices?
Yes
No
N/A
3.
Is there a work order system for scheduling maintenance? Is it explicit or implicit?



4.
Do work orders contain the following:
Yes
No
N/A

• Date?
Yes
No
N/A

• Work order number?
Yes
No
N/A

• Location?
Yes
No
N/A

• Nature of the problem?
Yes
No
N/A

• Work requirements?
Yes
No
N/A

• Time requirements?
Yes
No
N/A

• Assigned personnel?
Yes
No
N/A

• Space for reporting work performed, required supplies, time required, and cost summary?
142

-------
Industrial User Inspection and Sampling Manual Appendix C. General Operations and Maintenance
Questions
Yes No N/A	• Responsible staff member and supervisory signature requirements?
When emergency work must be performed without a work order, in one completed afterward?
Are work orders usable and acceptable by staff as essential to the maintenance program? Are
they actually completed?
Is work order information transferred to a maintenance record system?
Does a catalog or index system exist for controlling items in inventory?
Are withdrawal tickets used for obtaining supplies from the inventory?
Do the tickets contain cost information and interact well with inventory controls and the work
order system?
Is the cost and activity information from work orders aggregated to provide management
reports?
Is this information used for budget preparation?
Is the maintenance performance discussed regularly with staff?
How is the cost of contract maintenance or the use of specialized assistance recorded?
Are safeguards and penalties adequate to prevent maintenance cards from being returned
without the work being done?
Is the preventative maintenance record checked after an emergency equipment failure?
Yes
No
N/A
5.
Yes
No
N/A
6.
Yes
No
N/A
7.
Yes
No
N/A
8.
Yes
No
N/A
9.
Yes
No
N/A
10.
Yes
No
N/A
11
Yes
No
N/A
12.
Yes
No
N/A
13.
Yes
No
N/A
14.
Yes
No
N/A
15.
Yes
No
N/A
16.
143

-------
Industrial User Inspection and Sampling Manual
Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
Appendix D. EPA Memorandum, The Use of Grab Samples to
Detect Violations of Pretreatment Standards
144

-------
Industrial User Inspection and Sampling Manual
Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
(	1	UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON. D.C. 20460
OCT I 1992
SUBJECT:
FROM:
emsw
WATER
The Use of Grab Samples to Detect Violations of
Pretreatment Standards

Michael B. Cook, Direct
Office of Wastewater En
fiance (WH-546]
Frederick P. Stiehl
Enforcement Counsel for Water (LE-134W)
TO:	Water Management Division Directors, Regions I - X
Environmental Services
Division Directors, Regions I - X
Regional Counsels, Regions I - X
The primary purpose of this Memorandum is to provide
guidance on the propriety of using single grab samples for
periodic compliance monitoring to determine whether a violation
of Pretreatment Standards has occurred. More specifically, the
Memorandum identifies those circumstances when single grab
results may be used by Control Authorities, including EPA, State
or publicly owned treatment works (POTW) personnel, to determine
or verify an industrial user's compliance with categorical
standards and local limits. Please be aware that the concepts
set out below are applicable when drafting self-monitoring
requirements for industrial user permits.
REGULATORY BACKGROUND
The General Pretreatment Regulations require Control
Authorities to sample all significant industrial users (SIUs) at
least once per year [see 40 CFR 403.8(f)(2)(v)]. in addition,
the Regulations, at 40 CFR 403.12(e), (g) and (h) require, at a
minimum, that all SIUs self-monitor and report on their
compliance status for each pollutant regulated by a Pretreatment
Standard at least twice per year unless the Control Authority
chooses to conduct al^. monitoring in lieu of self-monitoring by
its industrial users.
The POTW should conduct more frequent sampling and/or
require more frequent self-raonitoring by an industrial user if
deemed necessary to assess the industry's compliance status (e.g. ,
a daily, weekly, monthly or quarterly frequency as appropriate) .
145
Prinm or meyeiM! fttfwr

-------
Industrial User Inspection and Sampling Manual
Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
- 2 -
The Regulations, at 40 CFR 403.12(g) and (h), also specify
that pollutant sampling and analysis be performed using the
procedures set forth in 4 0 CFR Part 136. Part 136 identifies the
proper laboratory procedures to be used in analyzing industrial
wastewater (including the volume of wastewater necessary to
perform the tests and proper techniques to preserve the sample's
integrity). However, with certain exceptions, Part 136 does not
specifically designate the method to be used in obtaining samples
of the wastewater. Rather, section 403.12(g) and (h) require
sampling to be "appropriate" to obtain "representative" data r
that is, data which represent the nature and character of the
discharge.
DISCUSSION OF BASIC SAMPLING TYPES
Sampling may be conducted in two basic ways. Both types of
sampling provide valid, useful information about the processes
and pollutants in the wastewater being sampled. The first is an
"individual grab sample." An analysis of an individual grab
sample provides a measurement of pollutant concentrations in the
wastewater at a particular point in time. For example, a single
grab sample might be used for a batch discharge which only occurs
for a brief period (e.g., an hour or less). Such samples are
typically collected2manually but are sometimes obtained using a
mechanical sampler.
The second type of sample is a "composite sample."
Composite samples are best conceptualized as a series of grab
samples which, taken together, measure the quality of the
wastewater over a specified period of time (e.g., an operating
day). Monitoring data may be composited on either a flow or time
basis. A f1ow-proportiona1 composite is collected after the
passage of a defined volume of the discharge (e.g., once every
2,000 gallons) . Alternatively, a flow-proportional composite may
be obtained by adjusting the size of the aliquots to correspond
to the size of the flow. A time-proportional composite is
collected after the passage of a defined period of time (e.g.,
once every two hours).
Generally, composite samples are collected using a
mechanical sampler, but may also be obtained through a series of
manual grab samples taken at intervals which correspond to the
wastewater flow or time of the facility's operations. In some
cases, composite data is obtained by combining grab samples prior
Mechanical samplers may not be used to sample for certain
pollutants (e.g., those which could adhere to the sampler tubing,
volatilize in the sampler, or pollutants with short holding times).
146

-------
Industrial User Inspection and Sampling Manual
Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
to transmittal to a laboratory. At other times, the samples
remain discrete and are either combined by the laboratory prior
to testing or are analyzed separately (and mathematically
averaged to derive a daily maximum value),
DETERMINING APPROPRIATE COMPLIANCE SAMPLING METHODS
EPA policy on appropriate compliance sampling types has been
articulated in several pretreatment guidance manuals and
regulatory preambles, and continues to be as follows:
A. Compliance With Categorical Standards
Most effluent limits established by categorical standards
are imposed on a maximum daily-average and a monthly-average
bases. Generally, wastewater samples taken to determine
compliance with these limits should be collected using
composite methods.
There are exceptions to the general rule. Composite
samples are inappropriate for .certain characteristic
pollutants (i.e., pH and temperature) since the composite
alters the characteristic being measured. Therefore,
analysis of these pollutants should be based on individual
grab samples. Alternatively, continuous monitoring devices
may be used for measuring compliance with pH and temperature
limits. Any exceedance recorded by a continuous monitoring
device is a violation of the standard.
Sampling wastewater from electroplating facilities
regulated under 40 CFR Part 413 may be conducted using
single grab samples [(assuming that the grab samples are
representative of the daily discharge for a particular
facility); see also preamble discussion at 44 Fed. Reg.
52609, September 7, 1979]
A series of grab samples may be needed to obtain
appropriate composite data for some parameters due to the
nature of the pollutant being sampled. Examples of this
situation include:
Daily maximum discharge limits are controls on the average
wastewater strength over the course of the operating day. They are
not intended to be instantaneous limits applied at any single point
during that operating day.
147

-------
Industrial User Inspection and Sampling Manual Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
- 4 -
Sampling for parameters which may be altered in
concentration by compositing or storage. These
pollutants include pH-sensitive compounds (i.e., total
phenols, ammonia, cyanides, sulfides); and volatile
orgar.ics such as purgeable halocarbons, purgeable
aromatics, acrolein, and acrylonitrile.
Sampling for pollutants with short holding times such
as hexavalent chromium and residual chlorine; and
Sampling for pollutants which may adhere to the sample
container or tubing such as fats, oil and grease.
Individual analysis for these parameters ensures that
all the material in the sample is accounted for.
B Compliance with Local Limits
Local limits may be established on an instantaneous,
daily, weekly or monthly-average basis. The sample type
used to determine compliance with local limits should be
linked to the duration of the pollutant limit being applied.
Compliance with instantaneous limits should be
established using individual grab samples. Exceedances
identified by composite sampling are also violations.
Compliance with daily, weekly or monthly average
limits should be determined using composited sampling
data, with the same exceptions noted in A, above.
Measurements of wastewater strength for non-
pretreatment purposes (e.g., surcharging) may be
conducted in a manner prescribed by the POTW.
GRAB SAMPLING AS A SUBSTITUTE FOR COMPOSITE SAMPLING
EPA is aware that a number of Control Authorities currently
rely on a single grab sample to determine compliance,
particularly at small industrial users, as a way of holding down
monitoring costs. It is EPA's experience that the process
activities and wastewater treatment at many industrial facilities
may not be sufficiently steady-state as to allow for routine use
Certain pH-sensitive compounds can be automatically
composited without losses if the collected sample is only to be
analyzed for a single parameter. Additionally, a series of grab
samples may be manually composited if appropriate procedures are
followed.
148

-------
Industrial User Inspection and Sampling Manual
Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
- 5 -
of single grab results as a substitute for composite results.
Therefore, the Agency expects composited data to be used in most
cases. However, there are several circumstances when a single
grab sample may be properly substituted for a single composite
sample. These situations are:
Sampling a batch or other similar short term discharge,
the duration of which only allows for a single grab
sample to be taken;
Sampling a facility where a statistical relationship
can be established from previous grab and composite
monitoring data obtained over the same long-term period
of time; and
Where the industrial user, in its self-monitoring
report, certifies that the individual grab sample is
representative of its daily operation.
Except for these circumstances, Control Authorities should
continue to use composite methods for their compliance sampling.
GRAB SAMPLES AS A COMPLIANCE SCREENING TOOL
Control Authorities may consider using grab samples as a
compliance screening tool once a body of composite data (e.g.,
Control Authority and self-monitoring samples obtained over a
year's time) , shows consistent compliance. However, in the event
single grab samples suggest noncompliance; the Control Authority
Grab sampling may provide results that are similar to
composite sampling. See for example, a March 2, 1989, Office of
Water Regulations and Standards (OWRS) Memorandum to Region IX
describing the results of a statistical analysis of sampling data
from a single industrial facility. These sampling data included
both individual grab and flow-proportional, composite sampling
obtained during different, non-overlapping time periods. After
reviewing the data, OWRS concluded that the composite and grab
sample data sets displayed similar patterns of violation for lead,
copper, and total metals. In fact, the analyses did not find any
statistically significant difference in the concentration values
measured between the grab and composited data. Furthermore,
additional statistical tests of the two data sets indicated that
the means and variances for each pollutant were similar. The
statistical conclusion was that the plant was judged to be out of
compliance regardless of what data were analyzed.
149

-------
Industrial User Inspection and Sampling Manual
Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
- 6 -
and/or the industrial user should resample using composite
techniques on the industrial user^ effluent until consistent
compliance is again demonstrated.
Control Authorities may also rely on single grab samples, or
a series of grab samples for identifying and tracking slug
loads/spills since these "single event" violations are not tied
to a discharger's performance over time.
Any time an SIU's sample (either grab or composite) shows
noncompliance, the General Pretreatment Regulations, at 40 CFR
403.12(g)(2), require that the SIU notify the Control Authority
within twenty four (24) hours of becoming aware of the violation
and resample within 30 days. Furthermore, EPA encourages Control
Authorities to conduct or require more intensive sampling in
order to thoroughly document the extent of the violation(s). Of
course, the use of grab samples should be reconsidered in the
event the SIU changes its process or treatment.
gUMMAH*
The collection and analysis of sampling data is the
foundation of EPA's compliance and enforcement programs. In
order for these programs to be successful, wastewater samples
roust be properly collected, preserved and analyzed. Although the
Federal standards and self-monitoring requirements are
independently enforceable, Control Authorities should specify, in
individual control mechanisms for industrial users, the sampling
collection techniques to be used by the industry. Generally,
pretreatment sampling should be conducted using composite methods
wherever possible, to determine compliance with daily, weekly or
monthly average 1imits since this sampling technique most closely
reflects the average quality of the wastewater as it is
discharged to the publicly owned treatment works. Grab samples
should be used to determine compliance with instantaneous
limits. There are circumstances when discrete grab samples are
also an appropriate, cost effective means of screening compliance
with daily, weekly and monthly pretreatment standards.
Where grab samples are used as a screening tool only (i.e.,
consistent compliance has been demonstrated by composite data), the
results should not be used in the POTW's calculation of significant
noncompliance (SNC).
when POTWs choose to allow the SIU to collect single grab
samples, the POTW should draft the SIU's individual control
mechanism to clearly indicate that grab samples are to be obtained
thereby preventing any uncertainty at a later date.
150

-------
Industrial User Inspection and Sampling Manual
Appendix D. EPA Memorandum, The Use of Grab
Samples to Detect Violations of Pretreatment
Standards
- ? -
In summary, there are limited situations in which single
grab sample data may be used in lieu of composite data. Assuming
adequate quality control measures are observed, analyses of these
grab samples can indicate noncompliance with Federal, State and
Local Pretreatment Standards and can form the basis of a
successful enforcement action. Grab sampling can also be useful
in quantifying batches, spills, and slug loads which may have an
impact on the publicly owned treatment works, its receiving
stream and sludge quality.
Should you have any further comments or questions regarding
this matter, please have your staff contact Mark Charles of OWEC
at (202) 260-8319, or David Hindin Of OE at (202) 260-8547.
cc: Frank M. Covington, NEIC
Thomas 0'Farrell, OST
Regional and State Pretreatment Coordinators
Lead Regional Pretreatment Attorneys, Regions I - X
Approved POTW Pretreatment Programs
151

-------
Industrial User Inspection and Sampling Manual Appendix E. Example Chain-of-Custody Form for
	Use by POTWs	
Appendix E. Example Chain-of-Custody Form for Use by
POTWs
152

-------

INDUSTRIAL WASTE MONITORING PROGRAM
ANALYSIS
SAMPLERS (Signatures)
COMMENTS/
PRESERVATIVE
Tiftic
Date
Source Description
Industry Code
G IP
Received by:
Received by:
Received by
S
Q.
C
Co
3
Q)
s
CD
I
0
3
a>
3
Q.
CO
03
1
CO
I
s
c
CD
Co

-------
Industrial User Inspection and Sampling Manual Appendix F. EPA Memorandum, Determining
	Industrial User Noncompliance Using Split Samples
Appendix F. EPA Memorandum, Determining Industrial User
Noncompliance Using Split Samples
154

-------
Industrial User Inspection and Sampling Manual Appendix F. EPA Memorandum, Determining
	Industrial User Noncompliance Using Split Samples
.--f S',,
~ I
t
tt
f
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON, O.C. 20460
JAN 2 i Bse
OFFiCE OF WATER
MEMORANDUM
SUBJECT: Determining Industrial User Compliance Using Split Samples
FROM:
Richard G. Kozlowslri. Director bf
Enforcement Division
TO:
Mary Jo M. Aiello, Acting Chief
Bureau of Pretreatment and Residuals
This memo is a response to your letter of September 30, 1991, where you requested
written clarification regarding the use of split samples for determining industrial user (IU)
compliance under the Pretreatmem Program. Specifically, you requested guidance on how to
use the data from split samples for determining IU compliance in situations where split
samples yield different analytical results. The fundamental question posed by your inquiry is
whether all analytical results must be used when evaluating the compliance status of IUs and
how to use those results for determining compliance. In situations where split samples exist
and both samples were properly preserved and analyzed, POTWs should evaluate compliance
with applicable Pre treatment Standards in the manner described below.
When evaluating the compliance status of an industrial user, the POTW must use all
samples which were obtained through appropriate sampling techniques and analyzed in
accordance with the procedures established in 40 GFR Part 136s. The Environmental
Protection Agency (EPA) has consistently encouraged Publicly Owned Treatment Works
(POTWs) to periodically split samples with industrial users as I method of verifying the
quality of the monitoring dam. When a POTW splits a sample with an IU, the POTW must
use the results from each of the split samples.
A legitimate question arises, however, when a properly collected, preserved and
analyzed split sample produces two different analytical results (e.g., one which indicates
compliance and the other shows noncompliance, or where both indicate either compliance or
noncompliance but the magnitudes are substantially different). In these instances, questions
arise regarding the compliance status of the IU, and what should be dose to reconcile the
results.
1 See Memorandum, "Applictiiofs and Use of the Reguksory Definieof! of Significant NefseompJiarsce fcr
Industrial Users," U.S. EPA, September 9, 1991.

155

-------
Industrial User Inspection and Sampling Manual Appendix F. EPA Memorandum, Determining
	Industrial User Noncompliance Using Split Samples
There is inherent variation in all analytical measurements, and no two measurements
of the same analyte (even when drawn from the same sample) will produce identical results.
When a split sample is analyzed using appropriate methods, there is no technical basis for
choosing one sample result over the other for determining the compliance status of a facility.
Since this is the case for all split samples which have been properly analyzed, the POTW
should average the results from the split and use the resulting average number when
determining the compliance status of an IU. Using the average of the two sample results
avoids the untenable situation of demonstrating compliance and noncompliance from the same
sample.
If the split sample produces widely divergent results or results which are different over
a long period of time, then the cause of the discrepancy between the analytical results should
be reconciled. When this happens, the POTW should investigate Quality Assurance and
Quality Control (QA/QC) procedures at each laboratory involved. For example, the POTW
could submit a spiked sample (i.e., a sample of known concentration) to the laboratories
involved (preferably blind) to determine which laboratory may be in error.
In situations where one or both of the analytical results is determined to be invalid,
there are compliance and enforcement consequences. If one of the analytical results is
determined to be invalid, the average value for that sample is also invalid. In this situation,
the value for this sample should be the value of the sample which was not determined to be
invalid (e.g., if the IU's results are determined to be invalid, the POTW- should use its sample
for assessing compliance, and vice versa). If both samples are determined to be invalid, the
averaged result from that sample should be discarded and not used for compliance assessment
purposes. In either case, the POTW must recalculate the compliance status of the IU using
all remaining valid sample results.
In summary, whenever split samples are taken and both are properly preserved anu
analyzed, the POTW should average the results from each sample and use the averaged value
for determining compliance and appropriate enforcement responses. Where the sample results
are widely divergent, the POTW should instigate QA/QC measures at each of the analytical
laboratories to determine the cause of the discrepancy. If one or both of the samples are
invalid, the POTW must recalculate the compliance status of the IU using all valid results.
If you have any further questions regarding these questions, please feel free to call me
at (202) 260-8304. The staff person familiar with these issues is Lee Okster. Lee can be
reached at (202) 260-8329.
cc: Cynthia Dougherty
Regional Pretreatment Coordinators
Approved State Pretreatment Coordinators
Bill Telliard
156

-------
Industrial User Inspection and Sampling Manual Appendix F. EPA Memorandum, Determining
	Industrial User Noncompliance Using Split Samples

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON, O.C. 20460
APR I 2 1993
OFFICiOF
' iz-iX
WATER
Mr. Harold R. Otis
Chairman. Split Sampling Task Force
Greater Fort Wayne Chamber of Commerce
826 Ewing Street
Fort Wayne, IN 46802-2182
Re: Using Split Samples to Determine Industrial User Compliance
Dear Mr. Otis:
In response to your letter of January 12, 1993, and your phone conversation of
February 9, 1993, with Lee Okster, I am providing a further discussion of the issues
surrounding the use of split samples to determine industrial user (IU) compliance with
Pretreatment Standards. In your letter and your phone conversation, you requested
clarification from the Environmental Protection Agency (EPA) on three issues. First,
you requested a firm definition of what constitutes "widely divergent results" when
comparing split sample results. Second, when a publicly owned treatment works
(POTW) splits a sample with an IU, you inquired whether a POTW must use the
industrial user's data to determine compliance with pretreatment standards. Finally, you
requested written authorization from the EPA to incorporate the language from our
existing guidance memorandum on split samples into the Rules and Regulations of the
Water Control Utility for the City of Fort Wayne.
What are Widely Divergent Results?
As you are aware, the EPA issued a memorandum on January 21. 1992, entitled
'Determining Industrial User Compliance Using Split Samples." The "widely divergent
results" criterion established in this memo is to be used as an indication that a problem
exists with the laboratory analysis. We did not include an indication of what constitutes
"widely divergent" in our memorandum because the amount of "normal" analytical
variability depends on the poilutant parameter being tested and the method being used
to analyze the sample. With appropriate QA/QC, this "normal" analytical variability is
small. In general, though, metals analyses have a smaller variation than organics
analyses, but the magnitude of the variability depends on the pollutants being tested.
Therefore, no hard and fast rules exist for determining what is widely divergent. This
determination is left to the discretion of the local authority.
Pnnt#d on Recycled Paper
157

-------
Industrial User Inspection and Sampling Manual Appendix F. EPA Memorandum, Determining
	Industrial User Noncompliance Using Split Samples
Must the POTW Use All Sample Results?
In the January, 1992, memorandum we state that ''the POTW' must use ail samples
which were obtained through appropriate sampling techniques and analyzed in
accordance with the procedures established in 40 CFR Part 136," The memo further
states "[w]hen a POTW splits a sample with an IU; the POTW must use the results from
each of the split samples."
The POTW is required to sample the IU at least once per year to determine,
independent of information supplied by the IU, the compliance status of that facility. If
the POTW does not wish to be in a position of comparing its own data with the IU when
it samples the IU's discharge, it is not required to split its samples with the IU.
Furthermore, we do not recommend that the POTW use a split sample with the industry
to satisfy its annual sampling requirement. The POTW should pull its own sample so
that it has data which are truly independent of the lU's results.
The POTW also has the primary responsibility to ensure compliance by the IU
with all applicable pretreatment standards and requirements. One way the POTW can
satisfy its requirement to ensure compliance is to split a routine sample taken by the IU.
If a POTW splits a routine sample taken by the IU. it must use the IU's data, in
conjunction with its own, to determine the compliance status of the facility (assuming all
of the data are sampled and analyzed appropriately). We encourage POTWs to split
samples in this manner to verify the IU's data. In a similar fashion, if the POTW
chooses to split its own sample with the IU. it must use all of the data to determine the
compliance status of the facility (assuming all of the data are appropriately analyzed).
When the POTW splits a sample with an IU (whether it is a routine sample by
the IU or an annual sample by the POTW) the POTW has the responsibility to
determine whether the IU's results from the split sample are valid. Where an IU's
results are'different than the POTW's, the burden is on the IU to show that all
preservation, chain-of-custody, and analytical and QA/QC methods were followed. If the
IU cannot make this showing, then the analytical results from the IU should be discarded
when determining the compliance status of the facility. If the IU establishes that it
followed all appropriate procedures, then the POTW should review its own QA/QC
program. If both the IU and POTW have followed appropriate procedures, and there is
still a wide divergence, then follow-up sampling should be conducted. If follow-up
sampling consistently shows IU noncompliance, or if the POTW is otherwise satisfied
with the validity of its own results, it should proceed to follow its enforcement
procedures.
Authorization From the EPA
In regard to your final request, the City of Fort Wayne has the authority to
incorporate these procedures into its Rules and Regulations without any authorization
from the EPA. As long as the City has the minimum legal authorities to implement its
-I
158

-------
Industrial User Inspection and Sampling Manual Appendix F. EPA Memorandum, Determining
	Industrial User Noncompliance Using Split Samples
approved program, it has satisfied its requirements under the Federal regulations. As
always, the City is encouraged to adopt the EPA's Pretreatment Guidance whenever
possible..
I hope this letter responds to your questions and concerns. If you have any
further questions, please feel free to call me at (202) 260-8304 or you can call Lee at
(202) 260-8329.
Sincerely yours,
ftichard G, KozlowsKi, Director
Water Enforcement Division
U.S. Environmental Protection Agency
cc Cynthia Dougherty
Regional Pretreatment Coordinators
Approved State Pretreatment Coordinators
159

-------
Industrial User Inspection and Sampling Manual
Appendix G. EPA Memorandum, Application and
Use of the Regulatory Definition of Significant
Noncompliance for Industrial Users	
Appendix G. EPA Memorandum, Application and Use of the
Regulatory Definition of Significant Noncompliance for
Industrial Users
160

-------
Industrial User Inspection and Sampling Manual Appendix G. EPA Memorandum, Application and
Use of the Regulatory Definition of Significant
	Noncompliance for Industrial Users	
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON, D C. 20460
SEF 9 !99l
OFFICE OF
WATER
MEMORANDUM
SUBJECT: Application and Use of the Regulatory Definition of
Significant Noncompliance for Industrial Users
FROM:
Michael B. Cook, Directo/ hf \{.A,ir({t Z f)
Office of Wastewater Enforcement and Compliance
f If}/
ifni
TO:
Water Management Division Directors, Regions I-X
Approved Pre treatment State Coordinators
Background:
On July 24, 1990, the Agency replaced the definition of "significant violation" with
the definition of "significant noncompliance" (SN.C) [see 40 CFR 403.8(f)(2)(vii) and 55
Fed. Reg. 30082], This change eliminated the inconsistencies which arose in applying the
significant violation criteria and established more parity in tracking violations committed by
industrial users. The definition of SNC parallels the Pretreatment Compliance Monitoring
and Enforcement Guidance (PCME) definition of SNC published in 1986.
This memorandum responds to several question from States, publicly owned
treatment works (POTWs), and industry regarding the application of the SNC definition.
One frcquendy asked question is whether the time frame for determining SNC for technical
review criteria effluent violations is a static six month period (i.e., a fixed six month
calendar interval) or a rolling six month time frame (i.e., the current day minus six
months). POTWs and industry have also inquired whether all data must be used to
calculate SNC. The following discussion is provided to promote consistency in the
application of this definition. Regions, States and POTWs should determine SNC in the
manner prescribed below.
Pretreatment POTWs are required to notify the public of significant industrial users
which meet the definition of SNC through publication in the newspaper. The POTW
should also use the SNC criteria as the basis for reporting an industrial user's compliance
status to the Approval Authority in its FYetreatment Performance Report. According to 40
CFR 403.l2(i)(2), the POTW must report on the compliance status of its industrial
user universe at the frequency specified by the State or EPA National Pollution
Discharge Elimination System (NPDES) permit, but in no case less than once per
year. Finally, the definition of SNC is used to determine whether a formal enforcement
action against a user is warranted in accordance with the POTW's Enforcement Response
Plan (ERF).
161

-------
Industrial User Inspection and Sampling Manual Appendix G. EPA Memorandum, Application and
Use of the Regulatory Definition of Significant
	Noncompliance for Industrial Users	
2
Applying the Definition: Use of the Six Month Time Frame:
There are seven criteria set forth in §403.8(f)(2)(vii). Two of these criteria concern
violations evaluated over ^ six month time frame. The Agency intends for Control
Authorities to evaluate these criteria on a rolling basis. The EPA's long established
practice in the NPDES program is to evaluate SNC for direct dischargers each quarter
using data from the previous six months. Similarly, Control Authorities should determine
SNC for their universe of industrial users on the same rolling quarters basis using fixed
quarters established by the Control Authority to correspond to its "pretreatment year" (e.g.,
March 31, June 30, September. 30 and December 31).
At the end of each quarter, POTWs and States are to evaluate their industrial user's
compliance status using the two criteria of the SNC definition which are evaluated on a six
month time frame (i.e.. the "A" and "B" criteria under the regulatory definition). Under
this system, each industrial user is evaluated for SNC four times during the year, and the
total evaluation period covers 15 months (i.e., beginning with the last quarter of the
previous pre treatment year through the end of the current year). When the POTW is
required to publish, it must list in the newspaper all industrial users which have been
identified as SNC during the previous year (i.e., the SNC criteria were met during an\£ of
the previous four quarters).
If a facility has been determined to be in SNC based solely on violations which
occurred in the first quarter of the 15 month evaluation period (i.e., the last quarter of the
previous pretreatment year) and the facility has demonstrated consistent compliance in the
subsequent four quarters, then the POTW is not reqvired to republish the Industrial User
(IU) in the newspaper if the IU was published in the previous year for the same violations.
Use of industrial User and POTW Data in Determining SNC:
Several POTWs have inquired whether all data, including Control Authority
sampling and industrial user self-monitoring, must be used in determining SNC. This
question arises from the concern that an industrial user may choose to conduct its sampling
efforts at times in which it knows that it is in compliance (e.g., during early morning stan-
up or during periods in which the industrial process is down). The concern is that use of
these unrepresentative data will allow the industry to craft its compliance status such that it
will never be in SNC.
The regulation defining SNC clearly requires that all measurements taken in the
appropriate six month period must be used to determine a facility's SNC status. Therefore,
any and all samples obtained through appropriate sampling techniques which have been
analyzed in accordance with the procedures established in 40 CFR Part 136 must be used
to determine whether the facility is in SNC.
The General Pretreatment Regulations further state that periodic compliance reports
must be based on data obtained through appropriate sampling and analysis, and the data
must be representative of conditions occurring during the reporting period (403.8(f)(l)(iv)
162

-------
Industrial User Inspection and Sampling Manual
Appendix G. EPA Memorandum, Application and
Use of the Regulatory Definition of Significant
Noncompliance for Industrial Users	
3
and 403.12(g)(3)]. The Control Authority must require that frequency and scope of
industrial user sclf-monitofing necessary to assess and assure compliance by industrial users
with applicable pretreatmem standards and requirements.
The nature and scope of the sampling undertaken by an industrial user is under the
control of the Control Authority through the issuance of an industrial user permit. These
permits should specify the sampling locations and sample collection method necessary to
ensure that representative samples are obtained for all regulated waste streams. By
requiring industrial users to obtain representative samples, the Control Authority will ensure
that industrial users do not evade noncompliance through selective sampling of their
industrial processes.
Conclusion:
The Control Authority is required to screen ail compliance data, whether generated
through industrial user self-monitonng or by the Control Authority, to identify any
violations of pre treatment requirements. Whenever there is a violation, the Control
Authority must take appropriate enforcement action, as defined in its ERP. After this
initial enforcement response, the Control Authority should closely track the industrial user's
progress toward compliance by increasing the frequency of user self-monitoring, increasing
the POTW's monitoring, or both.
When follow-up activity indicates that the violations persist or that satisfactory
progress toward compliance is not being made, the Control Authority is required to escalate
its enforcement response in accordance with the procedures established in its ERP. At a
minimum EPA expects POTVVs to address SNC with an enforceable order that
requires a return to compliance by a specific deadline. When this enforceable order
involves a compliance schedule, the industrial user remains in SNC during the period of
the schedule (unless the facility returns to compliance prior to the end of the schedule). For
example, if the duration of the schedule is two years, the facility should be published in
both years. Of course, the POTW should explain in its publication that the violations have
been addressed with a formal enforcement action (similar to a "resolved pending" listing on
the Quarterly Noncompliance Report).
The definition of SNC provides a benchmark against which the compliance status of
an industrial user and the enforcement activities of POTWs can be measured. The concept
of significant noncompliance plays a pivotal role in the implementation and enforcement of
the National Pre treatment Program. In order for the definition to succeed, it is critical that
each Control Authority apply it on a consistent oasis. If you have any further questions on
this issue, please feel free to call me at (202) 260-5850. The staff person familiar with
these issues is Lee Otester at (202) 260-8329.
cc Cynthia Dougherty
Regional Water Compliance Branch Chiefs
Regional Pretreatment Coordinators
Lead Regional Pretreatment Attorneys
163

-------
Industrial User Inspection and Sampling Manual Appendix H. EPA Memorandum, Compliance with
	Continuous Monitoring	
Appendix H. EPA Memorandum, Compliance with
Continuous Monitoring
164

-------
Industrial User Inspection and Sampling Manual Appendix H. EPA Memorandum, Compliance with
	Continuous Monitoring	
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON, D.C. 20460
MAT 13 1933
Mary Jo M. Aiello, Chief
Bur&au of Pretreatment and Residuals
Wastewater Facilities Regulation Program (CN 029)
New Jersey Department of Environmental
Protection and Energy
Trenton, NJ 08625-0029
Dear Ms. Aiello:
Thank you for your letter of January 25, 1993, to
Jeffrey Lape of my staff regarding the New Jersey Department of
Environmental Protection and Energy's (the Department) proposed
policy on waivers from pH limits applicable to industrial
discharges to Publicly Owned Treatment Works (POTWs). Subject to
the qualifications stated below, your proposed policy is
consistent with the federal regulations.
Your letter relates to the application of 40 CFR 401.17,
which allows facilities that employ continuous pH monitoring to
exceed certain pH limits one percent of the time. Your letter
correctly notes that 40 CFR 401.17 applies only to discharges to
surface waters, but inquires whether an analogous policy could be
applied to discharges to POTWs.
We believe an analogous policy could be applied to
discharges to POTWs, subject to several restrictions. First, the
federal pretreatment regulations contain a specific prohibition
against discharges with a pH below 5.0, from which no waivers are
allowed unless the treatment works is specifically designed to
accommodate such discharges (40 CFR 403.5(b)(2)). Your letter
correctly acknowledges that, except for such specifically
designed treatment works, waivers below this minimum limit would
not be consistent with federal regulations. Second, although
federal pretreatment regulations do not include an upper pH limit
applicable to all discharges, some categorical pretreatment
standards do so. Waivers from the requirements of those
categorical standards would not be allowed unless expressly
permitted by the standards themselves.
Third, a POTW may not grant a waiver from a local limit if
such waiver would cause pass through or interference. Since
local limits are based on considerations at each POTW, it would
not be appropriate to institute a waiver of local limits that
applies statewide regardless of conditions at individual POTWs.
Prfniffdof a"- • *" loer
165

-------
Industrial User Inspection and Sampling Manual Appendix H. EPA Memorandum, Compliance with
	Continuous Monitoring	
-2-
So long as POTWs act consistently with their obligations not to
allow pass through or interference, however, they might implement
waivers that apply either more or less frequently than the 1% you
propose. Of course, if it wishes, the State could cap all
waivers at 1% and thereby be more stringent than Federal law,
which requires no cap.
We note that, if a POTW wishes to provide waivers from pH
limits that are technically-based and are part of the POTW's
Approved Pretreatment Program, the POTW will have to modify its
Approved Pretreatment Program accordingly. The Department should
consider for each POTW whether the adoption of this policy is a
"change to local limits, which result in less stringent local
limits" and therefore requires a formal modification under 40 CFR
403.18(c)(1)(ii)r or whether it constitutes a clarification of
the POTW•s existing local limits.
I hope that this response addresses your concerns. If you
have any questions or would like to discuss this further, please
call me at (202) 260-5850 or Louis Eby at (202) 260-2991.
Sincerely
nthia C. Dougherty
units Division
166

-------
Industrial User Inspection and Sampling Manual
Appendix I. Hazards Associated with Specific
Industrial Categories	
Appendix I. Hazards Associated with Specific Industrial
Categories
Hazards Associated with Specific Industrial Categories
Industry
Physical
Atmospheric
Corrosive
Suggested
Protective Gear
Electroplating/
Metal Finishing
•	Cluttered areas
•	Sloppy housekeeping
•	Wet floors/loose boards
•	Heated plating baths
•	High amperage in
plating baths
•	Flammable vapors
•	Exposure to chlorine
•	Sulfur dioxide vapors
•	Cyanide vapors
•	Alkaline vapors/mist
•	Acid vapor/mist
•	Corrosive chemicals
used in plating process
•	Heavy metal baths
•	High voltage
•	Safety glasses
•	Neoprene gloves
•	Steel-toed boots
•	organic vapor/gas mask
Chemical
Blending/
Manufacturing
• Slippery floors
• Leaking mixing or
blending equipment
• Exposure to chemicals
due to leaking
equipment

Semiconductor
Manufacturing

• Exposure to Freon and
chlorinated solvents
• Exposure to acids
(hydrofluoric and
fluoroboric)

Pulp, Paper and
Paperboard
Manufacturing
•	Slippery floors
•	Steam heated tanks
•	Moving equipment
(fork
•	lifts)
•	Exposure to:
-	Ammonia (pulping
process)
-	Chlorine (bleaching
process)
•	Arsenic fumes
• Exposure to caustic
soda (pulping process)
•	Earplugs
•	Safety glasses
•	Latex gloves
•	Dust and mist mask
•	Boots
Battery
Manufacturing
•	Heat from steam curing
of pasted plates
•	Spills of wash water
•	Exposure to lead metal
particles during anode
production.
•	Exposure to sulfuric
acid vapors.
•	Lead fumes
•	Acid vapors
• Exposure to sulfuric
acid (pickling and
bleaching process)
•	Safety glasses
•	Boots
•	Latex gloves
•	Lead fume mask
•	Organic vapor/gas
mask
Leather Tanning
•	Slippery floors
•	Moving equipment in
wringing operation.
• Exposure to:
-	sulfuric acid
-	chromium
-	cyanide
-	naphthalene
-	phenol
-	pentachlorophenol
• Exposure to sulfuric
and hydrochloric acids
(acid pickling)

Iron and Steel
Manufacturing
•	Hot ovens
•	Hot baths
•	Particulates
•	Moving equipment
•	Slippery floors
• Exposure to toxic
vapors from hot baths


Industrial
Laundries
•	Heated equipment
•	Slippery floors
• Exposure to toxic
vapors from solvents


Aluminum
Formers
• Moving machinery
• Metal particulates
•	Nitric acid
•	Caustic solutions
•	Safety glasses
•	Boots
•	Latex gloves
•	Metal fume mask
•	Organic vapor mask
167

-------
Industrial User Inspection and Sampling Manual Appendix I. Hazards Associated with Specific
	Industrial Categories	
Industry
Physical
Atmospheric
Corrosive
Suggested
Protective Gear
Electrical and
Semiconductors
•	Wet floors
•	Loose boards
•	Acid vapors/mists
•	Ammonia vapors
•	Alkaline vapors
•	Metal fumes
•	Freon chlorinated
solvents
•	Borane gas
•	Chlorinates
•	Aromatic solvents
•	Hydrofluoric acid
•	Fluoroboric acid
•	Safety glasses
•	Boots
•	Latex gloves
•	Lead fume mask
•	Organic vapor mask
Metal Molding
and Casting
•	Tripping hazards
•	Hot liquid metals
•	Metal particulates
•	Degreasing solvents

•	Safety glasses
•	Boots
•	Latex gloves
•	Hard hat
•	Metal fume mask
Nonferrous Metals
•	Tripping hazards
•	Bum danger from hot
metals
• Cyanide gas
• Cyanide liquid
•	Safety glasses
•	Boots
•	Latex gloves
•	Hard hat
•	Organic vapor/gas
mask
Organic Chemicals
• Tripping hazards
•	Organic vapors/mists
•	Phenols
•	Ammonia
formaldehyde
•	Chlorine
•	Hypochlorite solvents
•	Plastic monomers
• Monomers
•	Safety glasses
•	Boots
•	Rubber gloves
•	Organic vapor/gas
mask
Pharmaceutical
• Tripping hazards
•	Radioactive materials
•	Biological materials

•	Safety glasses
•	Boots
•	Ear protection
•	Latex gloves
•	Dust mask
Soap and
Detergent
• Slippery floors
• Detergent dust
•	Acidic or alkaline
solutions
•	HighpH
•	Slippery oils
•	Safety glasses
•	Boots
•	Latex gloves
•	Particulate mask
Welding
•	Electric shock
•	Bums
•	Radiant energy/light.
•	Exposure to toxic
fumes
•	Potential for explosions
caused by sparks.


168

-------
Industrial User Inspection and Sampling Manual
Appendix J. Additional Information on the
POTW's Sampling and Quality Assurance Plan
Appendix J. Additional Information on the POTW's Sampling
and Quality Assurance Plan
The following components should be included in the POTW's Sampling and Quality Assurance Plan. The
inspector should consider each of these sampling program components when conducting compliance
sampling. These components are discussed in greater detail in the noted sections of this chapter.
Quality Assurance (Section 3.5)
•	QA/QC Procedures: The Sampling and Quality Assurance Plan should outline QA/QC
procedures to ensure that the data collected are valid, including systematic checks to verify that
the sample results are sufficiently accurate and precise to evaluate the compliance status of the
facility being sampled.
Equipment Maintenance (Section 3.6)
•	Maintenance: Maintenance activities ensure the constant reliability of sampling equipment,
including flow meters. The plan should outline a maintenance schedule for all POTW
equipment related to sampling.
•	Calibration: Calibration of field and laboratory equipment is crucial to the continued reliability
of the sample results obtained from sampling. A regular schedule of calibration should be
included in the plan and should be adhered to strictly. This calibration should include flow
meters, pH meters, and any other equipment requiring calibration, as recommended in the
manufacturer's specifications.
Sample Collection (Section 3.7 and 3.8)
•	Sampling Location(s): Sampling locations should be representative of industrial user
discharges. The plan should describe how inspectors should verify that the sampling location(s)
are adequate, and that all discharge points are appropriately monitored. The plan should also
address how to handle situations that would warrant sampling at locations other than those
specified in the control mechanism.
•	Type of Sample: The type of sample (composite or grab) depends on the parameters to be
measured and/or the discharge characteristics (e.g., batch discharge or continuous discharge).
This information is specified at 40 CFR 403.12(g) and is required to be specified in industrial
user permits. The plan should discuss when each type of sample is most appropriate for specific
parameters and discharge characteristics, and should describe the sample type requirements at
40 CFR 403.12(g).
•	Type of Flow Measurement: The type of flow measurement is dependent on the flow rate, the
condition of the wastewater, and the variability of the discharge. Flow measurements are
necessary to determine the mass loadings of a discharge. The adequacy of the industrial user's
flow measuring device should be verified at the time of sampling. The plan should describe
how to determine whether flow measuring devices are appropriate for measuring flow at a
particular facility and whether the device is consistent with what is described in the industrial
user's control mechanism.
•	Sample Volume: The volume of sample collected depends on the type and number of analyses
to be conducted. The volume of the sample obtained should be sufficient to perform all the
required analyses (including laboratory QA/QC and repeat analyses) plus an additional amount
to provide for any split samples that may be required. The Sampling and Quality Assurance
Plan should discuss these requirements.
169

-------
Industrial User Inspection and Sampling Manual
Appendix J. Additional Information on the
POTW's Sampling and Quality Assurance Plan
•	Type of Sample Containers: The selection and preparation of sample container type depends
on the parameters to be measured and wastewater characteristics. The plan should reference the
requirements at 40 CFRpart 136, Table II and discuss procedures for obtaining required sample
containers.
•	Cleaning and Preparation: Sampling equipment, grab and composite collection containers,
sample bottles, and tubing should be cleaned at a specified frequency outlined in the plan. All
cleaning procedures should be included in the plan.
•	Field Analyses: Certain measurements are typically performed in the field (e.g., flow, pH, and
temperature). Procedures for conducting these analyses should be included in the POTW's
Sampling and Quality Assurance Plan.
•	Sample Preservation Techniques: To preserve samples correctly, the appropriate chemicals
must be used and/or temperature control must be ensured. Preservation techniques and
maximum allowable holding times should be specified in the POTW's Sampling and Quality
Assurance Plan.
Samvle Documentation (Section 3.7)
•	Chain-of-custody Procedures: The success of documenting the validity of samples depends on
the constant use of COC forms by all involved personnel. The plan should describe chain-of-
custody procedures that must be followed for all samples collected by the POTW, and
directions for completing standard COC forms should be included.
•	Sample Identification Procedures: The plan should describe how sample containers will be
labeled so that the sample can be tracked accurately.
•	Additional Types of Documentation:
The plan should also include procedures for implementing the following additional types of
sampling documentation:
-	Field Data Record - The Field Data Record is the primary sampling information
document and should include: the sample site identification; the type of sample taken;
sampler identification; settings on the sampler; results of field analyses; flow information
(where applicable), and any additional information related to the site or effluent
characteristics.
-	Field Documentation Log - The field documentation log is used to record which sites are
sampled each day, and any violations, conversations or other notable occurrences during
the sampling visit.
-	Field pH Calibration Log - The field pH calibration log is used to record the calibration
of the field pH meter during the sampling event. The field pH meter must be calibrated at
each site prior to measuring the pH of the effluent. Calibration and slope should be
checked, adjusted as necessary, and recorded, along with the temperature of the buffer.
-	Flow Meter Calibration Log - The Flow Meter Calibration Log is used to record program
information for the flow meter and water level calibration from the initial value shown on
the flow meter to the actual measured water level.
-	pH Calibration/Spike Checklist - The pH Calibration/Spike Checklist is used to record
the date and time of field pH meter calibration, calibration data, results and true value for
the known sample, and to document the buffer and fill solution changes.
170

-------
Industrial User Inspection and Sampling Manual Appendix J. Additional Information on the
	POTW's Sampling and Quality Assurance Plan
Sample Shipping (Section 3.7)
•	Sample Packaging and Shipping: Once a sample is collected, it must be delivered to the
laboratory for analysis within the prescribed holding time. The manner of packaging and
shipment must be addressed through the Sampling and Quality Assurance Plan.
Safety (Chapter 4)
•	Safety Concerns: The plan should outline the safety precautions which must be followed both
at the office and in the field during sampling activities. Industrial monitoring, by its very nature,
adds additional hazardous situations to those existing in any field sampling situation. All safety
procedures should be outlined in the plan.
•	Hazardous Waste: Samples of potentially hazardous waste; samples with extremely high or
low pH; and samples that may contain toxic, volatile, or explosive substances will require
special handling. DOT regulations for shipping these types of wastes must be followed, and the
plan should contain these regulations.
171

-------
Appendix K. Additional Information on Field Sampling
Equipment
Checklist of Field Sampling Equipment	
Sampling Equipment:

• Siphoning equipment.
• Container for contaminated material.
• Weighted bottle sampler (grab sampler).
• Waterproof container labels.
• Liquid waste samplers.
• Ambient air monitor.
• Auger, trowel, or core sampler.
• Field document records.
• Scoop sampler.
• Vermiculite or equivalent packing.
• Sample bottles/containers (certified clean bottles).
• Thermometer.
• Ice chest.
• Colorimetric gas detection tubes.
• Flow meter (if applicable).
• pH equipment.
• Preservatives.
• Explosimeter (atmospheric testing device).
• Chain-of-custody forms.
• Tubing, tape and rope.
• Custody seals and tags.
• Field sampling logs.
• Strapping tape.
• Sample shipping forms (w1 laboratory phone #s).
• Automatic and/or composite sampler.
• Graduated cylinder.

• Preservatives (e.g., nitric acid and NaOH).
172

-------