j \ Office of Inspector General
\ ; Financial Audit Report
\ s9
*4 PHO*ff-
Grant No. X-824519-01
Awarded to the
National Association of
Minority Contractors
Report No. 2001-1 -00203	September 27, 2001

-------
Region Covered:
Region III
Headquarters
Program Offices Involved:	Grants Administration Division
Office of Small and Disadvantaged
Business Utilization
Resource Center
Conducting the Audit:
Contributor:
Mid-Atlantic Division,
Philadelphia, PA
Mark S. Phillips
Abbreviations
EPA:	Environmental Protection Agency
MBELDEF:	Minority Business Enterprise Legal Defense and Education
Fund
NAMC:	National Association of Minority Contractors
OIG:	Office of Inspector General
OMB:	Office of Management and Budget
OPEX:	Outreach and Opportunity Exchange
OSDBU:	Office of Small and Disadvantaged Business Utilization

-------
^	UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
OFFICE OF INSPECTOR GENERAL
MID-ATLANTIC DIVISION
1650 Arch Street
>,	Philadelphia, Pennsylvania 19103-2029
(215) 814-5800
O
LU
C3
September 27, 2001
MEMORANDUM
SUBJECT: Final Audit Report:
Grant No. X-824519-01 Awarded to the
National Association of Minority Contractors
Report Number: 2001^-00203
FROM: Carl A. Jannetti	Cj~
Divisional Inspector General for Audit
Mid-Atlantic Division (3AI00)
TO:	Marty Monell, Director
Grants Administration Division (3903R)
As a result of a 1995 grant, the Environmental Protection Agency (EPA) awarded
the National Association of Minority Contractors (NAMC) $750,000 to oversee the
monitoring of states' efforts to assist minority firms in obtaining contracting
opportunities, and the performing of outreach on environmental justice activities.
The grant was managed by EPA's Office of Small and Disadvantaged Business
Utilization (OSDBU).
In 1998, the Office of Inspector General (OIG) performed an audit of this grant
because of an anonymous Hotline complaint alleging poor grantee performance and
mismanagement of EPA grant funds. Consequently, we sought to: (1) determine
whether NAMC performed the required work; (2) evaluate the adequacy of
OSDBU's oversight; and (3) identify any mismanagement of EPA funds.
On August 23, 1999, we issued an Audit Report on the National Association of
Minority Contractors, which addressed the first two issues. The report disclosed
that although NAMC completed only a small portion of the work required by the
grant, OSDBU allowed NAMC to draw down all of the $750,000 in grant funds.
In that August 1999 report, we did not discuss our financial findings (the third
issue) so as to not interfere with an active OIG investigation into this matter.

-------
Subsequently, the investigation ended, and this represents our final financial audit
report regarding findings that describe problems OIG has identified and corrective
actions OIG recommends. This report represents the opinion of the OIG. Final
determinations on matters in this report will be made by EPA managers in
accordance with established EPA audit resolution procedures.
ACTION REQUIRED
In accordance with EPA Manual 2750, you are required to provide a final
determination on the costs questioned by December 26, 2001. Also, please submit
an electronic copy of your response to phinips-mark@epa.gov. Should your position
on the questioned costs differ from our recommendation, we would appreciate the
opportunity to discuss your position before the determination is issued to NAMC.
Please provide us a copy of the final determination when it is issued.
We have no objection to the further release of this report to the public. If you or
your staff have any questions regarding this report, please contact me or
Mark S. Phillips at (215) 814-5800. For your convenience, this report will be
available at http://www.epa.gov/oigearth/eroom.htm.

-------
Executive Summary
Purpose and Prior Audit Coverage
This audit was initiated because of an anonymous OIG Hotline
complaint alleging NAMC's poor performance and mismanagement
of grant funds. NAMC had received $750,000 in EPA funds to:
(1) monitor states' efforts to assist minority firms in obtaining
contracting opportunities; and (2) perform outreach on environmental
justice activities.
EPA OIG's prior Audit Report on the National Association of Minority
Contractors (Report No. 1999-00213), issued August 23, 1999,
indicated that EPA allowed NAMC to draw down all of the $750,000 in
grant funds even though it only completed a small portion of the
required work. This current report addresses financial issues
regarding NAMC's specific management of the funds.
Results of Review
We determined that of the $712,041 in EPA's share of the costs
incurred by NAMC under this grant, $456,873 of those costs were
ineligible and $141,237 were unsupported. Subtracting the $113,931
in acceptable costs incurred from the $750,000 paid to NAMC, we
concluded that a balance of $636,069 was due EPA from NAMC.
Recommendations, Responses, and OIG Evaluation
We recommended that EPA adjust the allowable costs and NAMC
repay EPA the $636,069. NAMC disputed some of our conclusions.
However, NAMC agreed the work has not been completed and
indicated it is willing to complete the grant work at no extra cost to
EPA. NAMC contends that once it completes the work, most of the
questionable costs will become resolved. EPA is considering whether
to give NAMC this extension. However, we do not agree with granting
NAMC a no-cost time extension. We do not consider it reasonable to
expect that NAMC could deliver a timely, quality product when all of
the grant funds have already been expended.
Report No. 2001-1-00203

-------
Table of Contents
Executive Summary	 i
Introduction	 1
Purpose and Prior Audit Coverage 		1
Background		1
Scope and Methodology 		2
Audit Results 		4
Recommendation 		5
Overall EPA and NAMC Responses 		5
OIG Evaluation 		6
Analysis of Expenditures to Verify Allowability	 7
Appendices	 19
1: EPA Response to Draft Report	 19
2: NAMC Response to Draft Report	 29
3: Distribution	 55

-------
Introduction
Purpose and Prior Audit Coverage
An audit of the National Association of Minority Contractors (NAMC)
was initiated in July 1998 because of an anonymous Hotline complaint
received by the Office of Inspector General (OIG) alleging NAMC's
poor performance and mismanagement of grant funds under
Environmental Protection Agency (EPA) Grant No. X-824519-01.
A prior EPA OIG report, Audit Report on the National Association of
Minority Contractors (Report No. 1999-00213), issued August 23, 1999,
discussed several performance issues related to the NAMC grant.
Specifically, that report disclosed that although NAMC completed only
a small portion of the work required by the grant it received, EPA
allowed NAMC to draw down all of the $750,000 in grant funds.
In that prior report, we did not discuss our financial findings, so as to
not interfere with an OIG investigation active at that time. Since that
investigation has ended, we are now publishing the results of the
financial part of our review. Specifically, regarding financial issues,
we sought to determine whether there was mismanagement of grant
funds.
Background
NAMC, located in Washington, DC, is a nonprofit trade association
established in 1969 to address the needs and concerns of minority
contractors, with a particular focus on assisting those businesses
involved in the construction industry. NAMC provides assistance to
minority contractors mainly through training and outreach. NAMC
currently has about 5,000 members and conducts three annual
membership conferences. Since 1986, NAMC received $4.6 million
through EPA grant awards.
In 1995, Congress earmarked $500,000 for EPA's Office of Small and
Disadvantaged Business Utilization (OSDBU) to oversee two
activities: (1) monitor states' efforts to assist minority firms in
obtaining contracting opportunities; and (2) perform outreach on
environmental justice activities. On September 25, 1995, OSDBU
awarded NAMC the $500,000 under Grant No. X-824519-01. NAMC
was required to conduct 5 state studies and 10 Outreach and
Opportunity Exchange (OPEX) conferences covering all 10 EPA

-------
regions. The grantee had from October 1, 1995 to March 31, 1997 to
complete the project. EPA was to provide 95 percent of the project
cost, with NAMC to provide the remaining 5 percent as a match.
The state studies were to assess the adequacy of each state's program
for making contracting opportunities available to small and
disadvantaged contractors. The exchange conferences were to inform
minority contractors of impending contracting opportunities. For the
grant work plan, OSDBU allowed NAMC to follow its proposal
verbatim. NAMC awarded the Minority Business Enterprise Legal
Defense and Education Fund (MBELDEF) a $161,000 contract to
perform the five state studies. With assistance from consultants,
NAMC was to conduct the 10 conferences.
On January 9, 1997, 3 months prior to the expiration of the project,
NAMC proposed to perform additional work. Specifically, NAMC
proposed doing five additional state studies and two needs
assessments at EPA regions. These assessments were intended to
determine what EPA and the states need to do to ensure that they
provide ample contracting opportunities to minority businesses. On
March 12, 1997, OSDBU awarded NAMC a $250,000 increase to
perform this additional work, and extended the work period to June
30, 1998.
Scope and Methodology
We conducted a financial audit of the costs claimed by NAMC under
this grant. We also audited NAMC's performance and reviewed EPA's
award and administration procedures. The scope of our work was
limited to activities conducted by NAMC under the grant, and on
EPA's program management aspects of the grant as they related to the
program office, OSDBU.
We performed our audit in accordance with the Government Auditing
Standards (1994 Revision) issued by the Comptroller General of the
United States. However, we did not follow all of the elements of the
planning standards in Chapter 6 because we initiated this audit as a
result of an OIG Hotline allegation. Our work focused on confirming
the Hotline issues raised in the complaint. The audit included tests of
the program records and other auditing procedures we considered
necessary. Other than the issues discussed in this report, no other
significant program management issues came to our attention that
warranted expanding the scope of our audit.
2
Report No. 2001-1-00203

-------
Our review of NAMC's internal controls was related to costs incurred
under the grant. It was limited to assuring compliance with federal
criteria and with NAMC's policies and procedures. Also, we reviewed
the Single Audit Reports prepared by NAMC's independent auditors
for fiscal years 1993 through 1996. The last Single Audit Report
included an assessment of NAMC's internal control structure for the
period ended March 31, 1996. Because of the inherent limitations in
any system of internal controls, errors or irregularities may occur and
not be detected. Except for the issues discussed in this report, nothing
came to our attention that would cause us to believe that NAMC's
internal controls were inadequate for our purposes.
To accomplish our audit, we reviewed EPA's policies and procedures
for administrating grants and the requirements specified in the grant
agreement. As criteria for conducting this audit, we used the:
•	Code of Federal Regulations Part 30,
•	Office of Management and Budget (OMB) Circular A-122,
•	EPA Order 5700.1, Policy for Distinguishing Between Assistance
and Acquisition, and
•	the Assistance Administration Manual
Also, we interviewed program officials from EPA Headquarters;
NAMC; and NAMC's contractor, MBELDEF.
Our audit field work began on July 7, 1998 and ended on November
30, 1998. We conducted our audit at EPA Headquarters, NAMC, and
MBELDEF. We reviewed records maintained by the Agency, NAMC,
and MBELDEF. These records included the grant application, the
grant agreement, amendments, progress reports, deliverables, and
other project files. We reviewed the costs claimed under the grant to
determine the reasonableness, allowability, and allocability of the
grantee's expenditures. For each cost claimed, we reviewed source
documentation such as invoices, canceled checks, travel reports, bank
statements, and time sheets. We also reviewed NAMC's compliance
with the program and financial reporting requirements of the grant.
On March 12, 1999, we issued a draft report on both the performance
and financial issues. OSDBU submitted a consolidated response on
May 26, 1999, which included comments from the OSDBU, the Grants
Administration Division, and the NAMC. We include all of those
3
Report No. 2001-1-00203

-------
responses as Appendices to this report. These responses address many
of the performance issues that were discussed in the previous
performance audit report as well as the financial issues addressed by
this current report.
The EPA and NAMC responses applicable to the financial issues are
summarized later in this current report, followed by our evaluation of
the responses. In addition, NAMC's specific comments to individual
notes in the "Analysis of Expenditures to Verify Allowability" section of
this report are included after each note, along with our evaluation.
Because NAMC's response was voluminous, we did not include the
exhibits that were provided with its response; they are available upon
request.
We conducted an exit conference with the Grants Administration
Division, OSDBU, and EPA's Office of General Counsel on June 7,
1999. That exit conference covered the draft OIG report issued
March 12, 1999, that covered both performance and financial matters.
However, the final report issued August 23, 1999, only covered the
performance matters, due to a pending investigation on the financial
aspects. That investigation of the financial matters was recently
completed. Since over 2 years had passed, we contacted the Grants
Administration, OSDBU, and NAMC on September 13, 2001, to
provide an update and discuss our plans to issue a final report on the
financial part of the review.
Audit Results
In our opinion, because of matters discussed in the detailed "Analysis
of Expenditures to Verify Allowability" section that follows, a portion
of the grantee's (NAMC's) claimed costs under EPA Agreement
X-824519-01, awarded for the period October 1, 1995 to June 30, 1998,
were not eligible under EPA regulations and grant requirements or
were not adequately supported in the accounting records.
We determined that of the $712,041 in EPA's share of the costs
incurred by NAMC under the grant reviewed, $456,873 of the costs
were ineligible and $141,237 were unsupported. Thus, $113,931 of the
costs incurred were considered acceptable. By deducting the
acceptable costs from the $750,000 awarded to NAMC, we concluded
that a balance of $636,069 was due EPA from NAMC.
Recommendation
4
Report No. 2001-1-00203

-------
We recommend that the Director of the Grants Administration
Division adjust the allowable costs in accordance with our
determination. In particular, NAMC should repay EPA $636,069.
Overall EPA and NAMC Responses
EPA Responses
Grants Administration Division: The Grants Administration
Division is not taking any action with respect to allowing or
disallowing costs in response to the draft audit report. The Grants
Administration Division will work with NAMC and OSDBU in
determining the actions that should be taken with respect to the costs
when the final audit report is issued. The Agency has not made a final
decision on whether to accept NAMC's proposal to complete the
activities provided for in the grant at no cost to EPA. However, EPA is
considering their proposal. Because of the number of changes in the
Minority Owned Business Enterprises and Women Owned Business
Enterprises environment since the inception of this grant, there is an
even greater need for this work to be done.
OSDBU: The draft report demonstrates that NAMC did not complete
the work it agreed to perform under the grant despite drawing down
all of the funds obligated for the project. However, the draft audit does
not dispute that NAMC actually incurred the costs charged to the
grant. NAMC has offered to complete the project without additional
funds from EPA, and on this basis, argues that the vast majority of the
$636,069 that the Draft Report recommends that the Agency disallow
will be eligible costs under the agreement. Absent additional
information indicating that NAMC spent the funds it obtained under
the grant for improper purposes, it appears that if NAMC completes
the grant work no funds will have been misused. We will, of course,
verify individual items of cost when the final audit report is issued.
NAMC Response
NAMC believes that certain findings of the Draft Report are based on
a mistaken or incomplete view of the performance of the grant by
NAMC and MBELDEF. Moreover, the Draft Report fails, on several
significant occasions, to consider fully the impact of the EPA's program
office mission requirements and the collateral impact on the grant
performance requirements. Consequently, NAMC respectfully
contends that the final recommendation contained in the draft report
5
Report No. 2001-1-00203

-------
is unfounded. NAMC, together with MBELDEF, continues to be
ready, willing, and able to fully complete the grant, in full conformity
with the expectations of the EPA program office and with the
Congressional mandate that authorized and funded the grant.
OIG Evaluation
We do not think it would be beneficial for NAMC to be afforded the
opportunity to complete the work at no additional costs to EPA.
NAMC has drawn down all of the EPA grant funds and has still not
completed a large portion of the work. It is not reasonable to expect
that NAMC could deliver a timely, quality product when all of the
grant funds have been expended. We note that the grant period has
already been extended three time - finally ending June 1998 - and
nothing has happened in the 3 years that have followed. Therefore, we
see no reason to think that NAMC will now complete the work.
Regarding specific items of costs questioned in NAMC's detailed
response, we have made minor changes based on additional
information provided. For specific treatment of each item of costs, see
the NAMC responses and OIG evaluations in the "Analysis of
Expenditures to Verify Allowability" section that follows.
6
Report No. 2001-1-00203

-------
Analysis of Expenditures
to Verify Allowability
For EPA Agreement X-824519-01, awarded to the
National Association of Minority Contractors
for the period October 1, 1995 to June 30, 1998
Costs Questioned
Cost
Costs




Category
Incurred
Accented
Ineligible
UnsuDDorted
Note
Personnel
$232,610
$ 0
$116,305
$116,305
1
Contractual
467,280
102,467
340,667
24,146
2
Telephone
21,565
10,039
10,039
1,487
3
Travel
18,783
2,688
9,520
6,575
4
Other
9.279
4.733
4.388
158
5
Total
$749,517
$119,927
$480,919
$148,671

EPA Share 95%
$712,041
$113,931
$456,873
$141,237

Payments to Date

$750,000



Balance Due EPA

$636,069



7
Report No. 2001-1-00203

-------
Note 1 We determined that NAMC's personnel costs and related fringe and
indirect costs of $232,610 were not properly supported because the
employee time sheets did not represent a reasonable estimate of the
actual work performed. In addition, we considered $116,305 of that
amount to also be ineligible. Therefore, the table on the preceding
page shows $116,305 to be ineligible and only the remaining $116,305
to be unsupported.
We considered all of these costs to be unsupported because OMB
Circular A-122 states that employees' personnel activity reports
(e.g., time sheets) must reflect a reasonable estimate of actual work
performed by the employee during the period covered by the report.
NAMC employees completed their time sheets at the end of every
2-week pay period. The NAMC Executive Director acknowledged that
the hours on the time sheets are not necessarily accurate on a daily
basis, but contended that the total hours for the 2-week period are a
good estimate of the actual activity.
We found that the individual time sheets reviewed were nearly
identical each pay period. This indicates that the time sheets do not
reflect actual activity, but that employees consistently used the same
percentages to charge various projects. We believe that for time sheets
to show reasonable estimates of actual hours, the estimates should be
made daily or shortly after the actual work is performed; they should
not be based on predetermined, consistently applied percentages.
In addition to these costs being unsupported, we also considered
50 percent, or $116,305, to be ineligible because the costs were not
reasonable or allocable in accordance with OMB Circular A-122. The
Circular states a cost is reasonable if it does not exceed that which
would be incurred by a prudent person under the circumstances
prevailing at the time the decision was made to incur the costs.
Moreover, the Circular states that a cost is allocable to a grant in
accordance with the relative benefits received. We do not consider it
reasonable to pay NAMC the full authorized grant payments while it
completed only a portion of the work required by the grant. Based on
the work completed, we considered the 50 percent estimate to be
reasonable.
Amount Ineligible $116,305
Amount Unsupported $116,305
8
Report No. 2001-1-00203

-------
NAMC Response
The time sheets that were submitted to NAMC on a bi-weekly basis
accurately reflect the daily work efforts on OPEX and other NAMC
activities. Had time been recorded on a daily basis as opposed to
bi-weekly, our position is that there would be no difference in the time
allocations for the given days.
NAMC acknowledges that an estimated $116,305 in Personnel costs
were deemed ineligible because the work has not been completed. It is
our understanding that should the work be completed at no additional
costs to EPA, these ineligible costs could then be deemed eligible.
OIG Evaluation
Our position remains unchanged for all Personnel issues. We still
contend that the employee time sheets did not represent a reasonable
estimate of the actual work performed.
Note 2 NAMC incurred $467,280 of contractual expenditures. Of this amount
we considered $340,667 ineligible and $24,146 unsupported. These
costs are summarized in the following table and then discussed in
detail:
Issue	Ineligible Unsupported
a.	Studies not completed	$229,517
b.	Not all conferences conducted	18,735
c.	Consultant costs ineligible	92,282
d.	Hotel overpayment		133
e.	Receipts not provided	$24.146
Totals	$340.667	$24.146
a. Studies not completed. MBELDEF estimated that each state
study would cost $32,000 to complete. NAMC paid MBELDEF
$325,517 although MBELDEF completed only 3 of the 10
studies required. Therefore, we accepted $96,000 ($32,000 X 3)
and considered the remaining $229,517 as ineligible because the
9
Report No. 2001-1-00203

-------
cost was unreasonable and unallocable in accordance with OMB
Circular A-122.
MBELDEF had gathered data at another three states but had
not compiled the information into a report. Therefore, we did
not consider the studies to be complete or the costs allocable to
the grant because the raw data, in and of itself, does not benefit
the grant. In accordance with OMB Circular A-122, these costs
were considered ineligible.
Amount Ineligible $229,517
NAMC Response
NAMC acknowledges that an estimated $229,517 in contractual
expenditures were deemed ineligible because the work has not
been completed. However, we feel that credit should be given
for the completion of an additional three state studies (the
report for which will be sent to EPA shortly) at this time,
leaving the ineligible costs for this category at $130,207
(utilizing an actual per study cost of $32,551.70 as opposed to
the approximation of $32,000 in the OIG Draft Report). It is our
understanding that should the work be completed at no
additional costs to EPA, these ineligible costs could then be
deemed eligible.
OIG Evaluation
Our position remains unchanged. In NAMC's April 1999
response to the draft report, they said they anticipated the final
report for three additional state studies would be completed
within the next few weeks. However, as of September 2001,
about 2 % years later, neither the Agency nor NAMC have
provided evidence that these reports have been completed.
As stated earlier, we do not believe NAMC should be afforded
the opportunity to complete the work at no additional costs to
EPA. NAMC has drawn down all of the EPA grant funds and
has still not completed a large portion of the work. It is not
reasonable to expect that NAMC could deliver a timely, quality
product when all of the grant funds have been expended.
10
Report No. 2001-1-00203

-------
b. Not all conferences conducted. A conference consultant was
budgeted to receive $18,000, or $1,800 per conference, to
coordinate the conferences. NAMC paid the consultant $22,335
although only 2 of the required 10 conferences were conducted.
Therefore, we accepted $3,600 ($1,800 X 2) and considered the
remaining $18,735 as ineligible. OMB Circular A-122 states
that a cost is allocable to a grant in accordance with the relative
benefits received. We do not consider it reasonable that NAMC
paid the conference consultant $22,335 to coordinate
2 conferences, considering that $18,000 was intended to pay for
all 10 conferences.
Amount Ineligible $18,735
NAMC Response
NAMC acknowledges that an estimated $18,735 in Conference
Consultant costs were deemed ineligible because the work has
not been completed. Once needs assessments were substituted
for conferences, this consultant began to assist the OPEX Project
Director in preparing for these needs assessments. Utilizing the
parameter of $1,800 for each conference and $3,150 for each
needs assessment (utilizing the 4 needs assessments for 7
conferences ratio), NAMC contends that $9,900 should be
deemed eligible costs in this category since 2 conferences and 2
needs assessments were conducted, leaving ineligible costs of
$12,435. It is our understanding that should the remaining
conference and needs assessment work be completed at no
additional costs to EPA, at least $8,100 of these ineligible costs
could then be deemed eligible.
OIG Evaluation
We disagree with NAMC regarding the amount of work that
needs to be completed. We contend that no needs assessments
have been completed versus two. We disagree that the
deliverable for a needs assessment was solely a meeting with a
region. It is not sufficient that a meeting takes place; at a
minimum, there needs to be a written record of what was
discussed and how this information will benefit minority
contractors. Therefore, our position remains unchanged.
11
Report No. 2001-1-00203

-------
c. Consultant costs ineligible. We considered the $92,282 paid to
four consultants ineligible. Two consultants were under
contract for only part of the period, and we determined that the
consulting services provided were generally not allocable to the
grant. For example, for one of those two consultants, the
consultant was paid $78,093 to provide legal services to NAMC.
Originally, the consultant completed time sheets. Then, NAMC
paid the consultant $2,000 every 2 weeks as a retainer. In total,
the consultant was paid $64,000 ($2,000 X 32 payments) in this
manner. On 32 invoices, the consultant indicated that 4 percent
to 80 percent of effort was classified as "Other NAMC."
NAMC's Executive Director said these "Other NAMC" hours
were not grant related and were erroneously charged to the
grant. We calculated that more than $21,000 was mischarged in
this manner. Additionally, there was no support to show the
remaining effort was allocable to the grant.
For the remaining two consultants, there were no consulting
agreements executed between NAMC and the consultants as
required by OMB Circular A-122. Without the required
consulting agreements, NAMC had no support indicating what
consulting services were provided. In particular, we could not
determine what portion of the services, if any, were allocable to
the grant. The Circular provides that to determine the
allowability of costs, some of the relevant factors are:
•	Adequacy of the contractual agreement for the service
(e.g., description of the service, estimate of time required,
the rate of compensation, and termination provisions).
•	The nature and scope of the services rendered in relation
to the service required.
•	The qualifications of the individual rendering the service
and the customary fees charged.
In addition, the consulting costs are ineligible because NAMC
did not procure the consultants in accordance with 40 CFR
30.45, which requires grantees to use and document in its
procurement files some form of cost or price analysis for every
procurement. Price analysis may be accomplished by the
comparison of price quotations submitted, market prices, and
similar indicia. Cost analysis is the review and evaluation of
each element of cost to determine reasonableness, allocability,
12
Report No. 2001-1-00203

-------
and allowability. When procuring the consultants, NAMC did
not consider cost or perform a price analysis. Without a cost or
price analysis, EPA has no assurance that the consulting
expenditures were reasonable and allowable.
Amount Ineligible $92,282
NAMC Response
For the consultant that was paid $78,093, NAMC acknowledges
that approximately $21,000 in charges were for "Other NAMC"
activities. However, approximately 50 percent of the remaining
$57,000 should be deemed eligible because the consultant
performed work in support of the grant. In addition to
participating in the initial planning for the grant, this
consultant participated in the drafting of the state study survey
materials, contributed to the presentation to OSDBU
representatives in December 1996, and performed numerous
other activities. NAMC calculates that $28,939 of this
consultant's costs should be deemed eligible if the OPEX work
was completed. In addition, this consultant brought specialized
knowledge of Federal procurement, affirmative action laws and
legislation, and regulatory/compliance procedures to the grant
that was cost-beneficial. Given this level of relevant capability,
the consulting costs were deemed reasonable. Furthermore, the
resumes and rates of the key consultants were presented to the
OSDBU and the consultant's participation was implicitly
accepted by OSDBU because they incorporated the NAMC
proposal in total as the Scope of Work for the grant.
For the remaining two consultants, their roles were to provide
administrative support to OPEX. Administrative support was
originally included as a personnel line item. However, it was
determined that OPEX would not be an on-going effort beyond
the grant period, thus this support would be contracted for. In
one instance, a letter of agreement was presented to the
individual consultant for signature and this letter indicated the
fact that 50 percent of the consultant's administrative support
was to be for OPEX. Therefore, NAMC contends that
approximately 50 percent of the OPEX-related costs of this
administrative support be deemed eligible based on the work
completed. If the OPEX work was completed at no additional
costs to EPA, the remaining 50 percent of OPEX-related costs
for administrative support could then be deemed eligible.
13
Report No. 2001-1-00203

-------
OIG Evaluation
Our position remains unchanged. Sufficient support has not
been provided to show how these charges are allocable to the
grant.
d.	Hotel overpayment. NAMC mistakenly overpaid $133 to a hotel
in connection with a conference held in Hartford, Connecticut.
Amount Ineligible $133
NAMC Response and OIG Evaluation
NAMC acknowledges the ineligible overpayment of $133 to a
hotel; therefore, our position remains unchanged.
e.	Receipts not provided. We considered $24,146 in contractual
expenditures unsupported. NAMC did not provide receipts for
these expenditures, as required by 40 CFR 30.21.
Amount Unsupported $24,146
NAMC Response
NAMC acknowledges the unsupported costs of $24,146 in
contractual expenditures. However, NAMC is continuing to
research the issue and hope, at some point, to be able to provide
supportive documentation for these expenditures.
OIG Evaluation
Our position remains unchanged. It should be noted that in the
more than 2 XA years since we received NAMC's response to the
draft report (April 22, 1999), no further support has been
provided.
Note 3 We considered $1,487 of $21,565 incurred for telephone expenditures
to be unsupported because NAMC did not provide receipts as required
by 40 CFR 30.21. Moreover, we considered $10,039, or 50 percent, of
the remaining telephone expenditures as ineligible because the costs
were not reasonable and allocable in accordance with OMB Circular
A-122. We do not consider it reasonable to pay NAMC the full
14
Report No. 2001-1-00203

-------
authorized grant payments while they completed only a portion of the
work required by the grant.
Amount Ineligible $10,039
Amount Unsupported $1,487
NAMC Response
NAMC acknowledges the $1,487 in unsupported telephone
expenditures. NAMC also acknowledges that an estimated $10,039 in
telephone costs were deemed ineligible because the work has not been
completed. If the OPEX work was completed, these ineligible costs
could then be deemed eligible.
OIG Evaluation
Our position remains unchanged as no additional support has been
provided.
Note 4 NAMC incurred $18,783 in travel expenditures. Of this amount we
considered $9,520 ineligible and $6,575 unsupported. We considered
the $9,520 ineligible because there was no indication how any of the
following travel benefitted the grant:
NAMC Conference
$5,943
Oakland, CA
2,662
NAMC's Corporate Lawyer
863
Brownfields Conference
27
American Bar Association
25
Total
$9,520
OMB Circular A-122 requires that travel costs must benefit the grant
in order for these costs to be allocable. Additionally, we considered an
additional $6,575 in travel expenditures to be unsupported because
NAMC did not maintain documentation, such as travel reports, as
required by 40 CFR 30.21.
Amount Ineligible $9,520
Amount Unsupported $6,575
NAMC Response
15
Report No. 2001-1-00203

-------
Of the $9,520 in Travel expenditures that were deemed ineligible,
NAMC contends that at least $5,970 was directly beneficial to the
grant. The $5,943 in NAMC conference costs covered the OPEX
personnel who traveled to the conference to make a major presentation
on OPEX for the more than 300 contractors in attendance. One of the
acknowledged objectives of the OPEX grant is to "raise the level of
public awareness and knowledge of environmental contracting
opportunities." Again, the reason NAMC was selected for this grant is
that we have a built-in constituency that is prepared to avail
themselves of these opportunities. The NAMC conference was a logical
and opportune occasion for such outreach. Likewise, the OPEX Project
Director was invited to attend a Brownfields conference and serve on a
panel in order to provide an overview of NAMC's activities with
OSDBU, including OPEX. Also in attendance at this conference were
the present Director of OSDBU and the OPEX Project Officer. The $27
in OPEX cost of this conference was a proportional allocation of
expenses.
NAMC contends that the $6,575 in unsupported travel be allowed
because receipts for such travel were provided, the nature of the travel
was indicated, and it was clear that the travel was related to OPEX
activity.
OIG Evaluation
Our position remains unchanged. No additional support was provided
to show how the $5,943 for the NAMC conference and the $27 for the
Brownfields Conference were related to the grant. Moreover, we
disagree with NAMC's position that receipts supporting the $6,575
were provided.
Note 5 NAMC incurred $9,279 of Other Expenditures. Of this amount we
considered $4,388 ineligible and $158 unsupported, as summarized in
the table and the text that follows.
16	Report No. 2001-1-00203

-------
Issue
Ineligible Unsupported
a.	Procurement practices
inappropriate
b.	Advertisement questioned
c.	Publication double charged
d.	Support not provided
$4,192
167
29
$158
$158
Totals
$4.388
a. Procurement Practices Inappropriate. When procuring a
computer for $3,246, office furniture for $524, and office
supplies for $422, NAMC did not perform the cost or price
analysis required by 40 CFR 30.45. Instead, they selected the
vendors based on past experiences and recommendations.
Therefore, we considered these expenditures as ineligible.
NAMC Response
NAMC contends that $3,246 in a computer purchase deemed
ineligible be allowed because the selection of the vendor was the
result of a cost analysis that included comparing the computer
cost from the ultimate vendor (Gateway) with comparable direct
mail vendors (Dell) and area retail stores (Office Depot,
Staples). Gateway had the best price and service, with free, 24-
hour toll-free technical support. In the case of office furniture
and office supplies, a similar cost analysis had been done prior
to these purchases. The office furniture purchase was for an
additional desk that NAMC had already determined was a
quality product because it was the same as other office furniture
that had been purchased over the past several years. The Office
Manager examined various office furniture catalogues before
purchasing from the least expensive vendor. Likewise, office
supplies were ordered in a similar manner. NAMC therefore
contends that $524 and $422 in office furniture and office
supplies, respectively, be deemed eligible cost.
Amount Ineligible $4,192
17
Report No. 2001-1-00203

-------
OIG Evaluation
Our position remains unchanged. There was no additional
written documentation provided to support that NAMC
performed the price and cost analyses described above.
b.	NAMC paid $167 to a Radio Think Tank for a Youth and
Development advertisement in connection with the Million Man
March. We considered this cost ineligible because it did not
benefit the grant. As a result, in accordance with OMB Circular
A-122, this cost was not allocable to the grant.
Amount Ineligible $167
NAMC Response and OIG Evaluation
NAMC did not address this note in their response; therefore, our
position remains unchanged.
c.	Publication double charged. NAMC mistakenly double charged
$29 for a publication.
Amount Ineligible $29
NAMC Response and OIG Evaluation
NAMC did not address this note in their response; therefore our
position remains unchanged.
d.	Support not provided. We considered $158 unsupported because
NAMC did not provide the supporting records required by
40 CFR 30.21. NAMC did not: indicate how an $81 bank charge
was allocated to the grant; provide documentation to show that
$48 incurred for lunch was for an allowable business meeting;
or provide receipts for a $29 publication.
Amount Unsupported $158
NAMC Response and OIG Evaluation
NAMC did not address this note in their response; therefore, our
position remains unchanged.
18
Report No. 2001-1-00203

-------
Appendix 1
EPA Response to Draft Report
19
Report No. 2001-1-00203

-------
* %
A
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON, D.C. 20460
s*V
'	OFFICE OF
SMALL AND DISADVANTAGED
BUSINESS UTILIZATION
May 26, 1999
MEMORANDUM
SUBJECT
FROM:
rity Contractors
winv^c ui oinaii anu .L/i&auvaincigcu dumhc&& i^uuz-auuii
TO:
Carl A. Jannetti
Division Inspector General for Audit
Mid-Atlantic Division
This is in response to your request for comments on the subject draft report. The draft
report designates the Director, Office of Small and Disadvantage Business Utilization
(OSDBU) as the primary action official for the subject Draft Audit Report (Draft Report).
OSDBU worked with the Grants Administration Division (GAD) and the Office of General
Counsel (OGC) to develop a consolidated response to the draft report. We appreciate your
staffs courtesy in providing extensions of time to respond fully to the draft report, and look
forward to working with you in resolving this matter.
As you requested, we have addressed the factual accuracy of the draft audit report and
have indicated our concurrence or nonconcurrence with each finding and proposed
recommendation. Our response is Attachment 1 to this memo. Additionally, counsel for the
National Association of Minority Contractors (NAMC) submitted a response to the draft
report dated April 22, 1999, which we include as Attachment 2.
Any questions or comments on this response should be addressed to David Sutton,
Deputy Director, OSDBU. David may be reached on (202) 260-4471.
Attachments
Internet Address (URL) • http://www.epa.gov
Recycled/Recyclable • Printed with Vegetable oil Based Inks on Recycled Paper (Minimum 30% Postconsumer)

-------
Attachment 1
OFFICE OF SMALL AND DISADVANTAGED BUSINESS UTILIZATION AND
GRANTS ADMINISTRATION DIVISION RESPONSE TO DRAFT AUDIT REPORT No.
E6DEA8-03-0025 (Dated March 12, 1999).
I. ADDITIONAL FACTS
A.	The principal purpose of EPA financial assistance to NAMC for Needs Assessments.
The March 12, 1997 amendment to the NAMC agreement did not authorize NAMC to
perform needs assessments that "were intended to determine what EPA needed to do to ensure
that it provided ample contracting opportunities to minority businesses " as asserted at p. 1 of the
Draft Report. The Draft Report contends that "[t]he work plan described needs assessments as a
consultation with EPA regional officials to discuss what EPA must do to ensure minority
contractors receive a sufficient amount of contracting opportunities." Draft Report, p. 8. In fact,
NAMC's January 9, 1997 work plan for the needs assessments focused on consultation between
NAMC and both EPA-regional and state environmental officials "to determine how best to
provide further assistance through the OPEX program to the states and regions in question; and
development of state and/or region-specific strategies for implementation in subsequent OPEX
program years." (1/9/97 NAMC proposal at 3.O.).
The acronym "OPEX" refers to NAMC's disadvantaged business outreach and
opportunity exchange conferences relating to utilization of disadvantaged businesses by states in
procurement under EPA grant programs. Therefore, the intent of EPA's financial assistance for
this activity was to help NAMC meet the needs of the states and the disadvantaged business
community served by NAMC's OPEX conferences, rather than the Agency's needs. These
activities are appropriately carried out under an assistance agreement.
B.	OSDBU's alleged negligence.
The draft audit report states on p. 6, in bold letters, that "Negligent Oversight by OSDBU
Resulted in Misuse of EPA Grant Funds." This conclusory statement is unsupported by the facts
and is unnecessarily pejorative. It is apparently based on the following inaccurate factual
assertions.
1. "Although NAMC completed only a small portion of the work required by the grant it
received, OSDBU allowed NAMC to draw down all of the $750,000 in grant funds that EPA
provided." Draft report at p. 1.
Under the grant's terms and conditions, NAMC was paid under the Automated Clearing
2

-------
Attachment 1
House (ACH) method of payment. Under this method, the project officer (PO) and the grants
management officer (GMO) do not see the payment requests either before or after payments are
made. The recipient sends the requests directly to the servicing finance office and the requests do
not include any supporting financial documentation. Therefore, OSDBU did not have access to
information that would enable it to monitor the rate at which NAMC drew down grant funds.
2.	"At the close of the project, the OSDBU project officer stated that she did not have a clear
understanding of what work was required or completed." Draft report at p. 6.
The Project Officer generally understood what was required under the NAMC scope of
work, but felt that she would have to review her files to describe the work in detail and address
the amount of work actually completed.
3.	"OSDBU received three progress reports during the first 12 months of the project and was
aware that the project was not near completion. In evaluating whether to award NAMC the
$250,000 amendment, OSDBU did not consider NAMC's poor performance under the original
grant." Draft report at p. 6.
OSDBU did consider that NAMC was behind in completing the work, but OSDBU/GAD
granted NAMC no- cost extensions and the funding increase based on assurances from NAMC
that the work would be completed.
4.	"Besides not completing the required work, NAMC did not satisfy the cost sharing
requirements of the grant it received from EPA. OSDBU took no action to ensure NAMC
provided the required cost share."
The required cost share for this project was 5%, but it is the recipient's responsibility to
meet its cost sharing requirement as it draws down the EPA grant through the ACH. For
Headquarters awards, the servicing financial management center reviews the recipient's Final
Financial Status Report (SF 269) to assure the recipient did, in fact, meet any cost sharing
requirement. Therefore, it was not appropriate to state that OSDBU took no action to ensure
compliance.
5.	Misuse of Grant Funds.
The Draft report demonstrates that NAMC did not complete the work it agreed to
perform
3

-------
Attachment 1
under the grant despite drawing down all of the funds obligated for the project.1 However, the
Draft audit does not appear to dispute that NAMC actually incurred the costs charged to the
grant. NAMC has offered to complete the project without additional funds from EPA, and on this
basis, argues that the vast majority of the $636,069 that the Draft Report recommends that the
Agency disallow will be eligible costs under the agreement. Absent additional information
indicating that NAMC spent the funds it obtained under the grant for improper purposes, it
appears that if NAMC completes the grant work no funds will have been misused. We will, of
course, verify individual items of cost when the final audit report is issued.
C. Technical Suggestions for the Audit. The Director, GAD has the following suggestions.
Page 4, first paragraph- It would be preferable to replace this reference to the Assistance
Administration Manual (as well as those following) with "Project Officer's Training Manual".
The PO training manual is the most current guidance available for managing assistance
agreements.
Pg 4, second paragraph-The report states that the Manual authorizes the project officer to
withhold payment. Only the award official can withhold payment (see 40 CFR 30.902).
Pg 4, third paragraph-The report states that funds were misused, but it does not state how the
funds were misused. If they were used for project expenses, this does not appear to be a misuse
as we understand the term. If the funds were misused, the report needs to make clear how they
were inappropriately used.
Pg 4, third paragraph-The report states that OSDBU should only approve draw downs if
sufficient work is completed. Project Officers do not have an opportunity to approve or
disapprove draw downs. They can monitor draw downs and work with the Award Official to
stop or delay payments.
Pg 5, last paragraph to Page 6-A grant is not a contract, so its principal purpose is to benefit the
recipient and its constituents, not EPA. The sentence that states "thereby providing no value to
the Agency" should be removed. The recipient is to carry out its project, not the Agency's and
the Agency is not to be the principal beneficiary. It seems to us the report implies that the award
should be annulled in accordance with 40 CFR 30.904 (a)(5) because it failed to meet the project
purpose. If that is the case, you should revise it to reflect that approach. On the other hand, if the
work the recipient did with the funds was for the work under the grant, then the report should
question the costs based on reasonableness or other problems, or explain how the funds were
used.
1 NAMC's response does not take issue with this conclusion.
4

-------
Attachment 1
Pg 11, second paragraph-We do not agree that because the time sheets were nearly identical, the
time keeping system was inadequate, nor do we believe that time sheets need to be signed daily to
meet the intent of OMB Circular A-122.
Pg 11, third paragraph-We do not agree that the fact that NAMC allows its employees a one hour
lunch is necessarily unacceptable. If that practice is consistent with NAMC's personnel practices
in other cases, it would be inappropriate to disallow this cost.
II. FINDINGS AND RECOMMENDATIONS
Finding: OSDBU Allowed NAMC Full Payment For Limited Work
Additional Facts. As discussed above, neither the OSDBU PO nor the GAD Grants Specialist
received "real time" information on the rate at which NAMC drew down funds. This situation is
not limited to OSDBU project officers. The Government made a conscious policy decision to
allow recipients to draw down payments in advance under the ACH method. This decision
struck a balance which gave greater weight to the recipient's need for immediate access to funds
to carry out grant supported activities than to agencies' ability to compare draw downs with
progress towards completion of the funded activity. One of the unintended consequences of the
policy choice is situations described in the Draft Report where the recipient is able to draw down
funds at a rate greater than its progress towards completion of the assisted activity.
Recommendation:
The Director, Office of Small and Disadvantaged Business Utilization should require her
staff to manage grant projects in accordance with the EPA Assistance Manual. To that end,
OSDBU project officers should ensure recipients comply with the terms of the agreement, and
that the draw down of funds is proportional to the recipient's rate of progress.
OSDBU Position:
The Director, OSDBU partially concurs with this recommendation. The Director agrees
that grant projects should be managed in accordance with the EPA Project Officer Training
Manual and that project officers should ensure recipients comply with the terms of the agreement.
(It is GAD's position that the training manual is the Agency's most current guidance with respect
to Project Officers' roles and responsibilities. The Assistance Manual is similar, but dated.)
However, under the current Government-wide assistance regulations and standard
5

-------
Attachment 1
Agency terms and conditions for ACH, OSDBU's POs do not routinely receive payment or
financial status information which can be used in conjunction with recipient progress reports to
ensure that draw downs are proportional to the recipient's rate of progress .
The Director agrees that additional procedures that would allow OSDBU to implement
the OIG's recommendation are desirable. Absent a change in Government wide policy, however,
OSDBU can only recommend to GAD that payments be withheld or that the Agency impose a
special term and condition when specific circumstances indicate the need for the PO to have
authority to deny payment requests that are not proportional to the recipient's rate of progress.
To ensure grant projects are managed in accordance with the EPA Project Officers
training Manual, the Director, OSDBU has taken the following steps:
-	Implemented a project officer checklist in August 1998. Based on discussions with the
Auditors, this checklist was updated in February 1999 and a copy was provided to the auditors.
-	Established an automated system to track the status of OSDBU grants in August 1998.
-	Scheduled staff members for project officer training to be held June 2-3, 1999.
-	Began a review of office responsibilities to determine whether project officer duties
should be reassigned. This action should be completed by June 30, 1999.
-	Began a review of OSDBU's remaining four grants. OSDBU expects to complete this
review by June 30, 1999. All four grantees are paid under the "Advance Payment" method.
Under this method of payment, recipients draw down funds on an as needed basis. However, as
was the case with the NAMC grant, these requests for payment do not come to the project officer
for approval.
OSDBU has a new Director and a new Deputy. Both individuals recognize and have
reemphasized the importance of grants management and will continue to monitor operations to
ensure grants are managed in accordance with EPA regulations and guidance and the EPA Project
Officers Training Manual. In situations where Project Officers determine that grantees are not in
compliance with grant terms and conditions, OSDBU will work with GAD and OGC to determine
whether payments can/should be withheld, the agreement terminated, or special terms and
conditions imposed.
Recommendation:
The Director of the Grants Administration Division should adjust the allowable costs in
accordance with the IG's determination and require NAMC to repay EPA $636,069.
6

-------
Attachment 1
GAD Position:
The Director, GAD is not taking any action with respect to allowing or disallowing costs
in response to this draft audit report. GAD will work with the recipient and the appropriate EPA
offices in determining the actions that should be taken with respect to the costs when the final
audit report is issued.
The Agency has not made a final decision on whether to accept NAMC's proposal to
complete the activities provided for in the grant at no cost to EPA. However, we are considering
their proposal. In view of the number of changes in the MBE/WBE environment since the
inception of this grant, there is an even greater need for this work to be done. Therefore, we are
immediately beginning a dialogue with the regions to determine which states could benefit most
from the additional work. It is necessary for us to move out on this immediately to make sure we
don't contribute to additional delays and to complete the project as soon as possible. We would
like to meet with you to discuss this issue as soon as possible, preferably during the second week
of June 1999. Please contact David Sutton at (202) 260-4471 to let him know when you would
be available to have this discussion.
Finding: EPA Should Have Awarded A Contract Instead of A Grant for the Needs
Assessments that NAMC performed.
Additional Facts: As discussed above, the principal purpose of the needs assessment activity was
to obtain information that would enable NAMC to conduct OPEX conferences that were
responsive to the interests of disadvantaged businesses and states. EPA did derive some indirect
or incidental benefits from the needs assessment activity. However, the Agency's "Policy for
Distinguishing Between Assistance and Acquisition" EPA Order 5700.1 (3/22/94) states "...there
may be cases where EPA expects to derive some incidental use or benefit from funded activities.
Such incidental use or benefit does not preclude an award of assistance when the principal
purpose is public support or stimulation. For such cases, an assistance vehicle may still be
appropriate. . . If an expenditure will produce a benefit or use that is not direct, a contract is not
required." EPA Order 5700.1, p. 6 (emphasis in original). EPA Order 5700.1 also recognizes
that the unique role that state officials have as partners with the Agency through shared
operational responsibilities for environmental efforts. EPA Order 5700.1, p. 8.
Recommendation:
Evaluate whether work proposed under grants should be obtained by grant or contract.
These reviews should be performed to ensure compliance with EPA Order 5700.1.
7

-------
Attachment 1
OSDBU Position:
The Director, OSDBU concurs with the intent of this recommendation, however the
Director contends that OSDBU's decision to include needs assessments as part of the grant was
within the range of discretion accorded by legal and policy standards. The Draft Report does not
accurately characterize the scope of work for the grant. It does not provide evidence sufficient to
conclude that the needs assessments were principally for EPA's direct use or benefit. OGC and
GAD concur with this position.
Project officers are aware of the requirement to evaluate work to make sure it should be
obtained by grant or contract and will continue to make the evaluations on all future awards.
Notwithstanding OSDBU's disagreement with the findings in the Draft Report, the Director
recognizes that NAMC and, its sub-awardee, MBELDF, may have misunderstood the nature of
their legal relationship with EPA while carrying out the grant. The Director acknowledges that
actions taken by OSDBU may have inadvertently contributed to the misunderstandings. Although
the Agency has not made a final decision on whether to accept NAMC's proposal to complete the
activities provided for in the grant at no cost to EPA, if the proposal is accepted, OSDBU will
make it clear that any activities NAMC undertakes to complete the agreement must directly
benefit minority businesses and states rather than EPA.
The Director, GAD, also concurs with the intent of the recommendation, but does not
agree the Grants Specialist was mistaken in approving the amendment. It is the Director's view
that the statement of work for the amendment appears to constitute work that is appropriate for
support of grant funding and consistent with the requirements of the Federal Grant and
Cooperative Agreement Act. It is GAD policy that specialists review amendments to assure any
change in the scope of project is not for the direct use and benefit of EPA. It may be, if the grants
specialist indicated differently, that the specialist was not considering the case where the
amendment would change the work plan's scope.
8

-------
Appendix 2
NAMC Response to Draft Report

-------
Law Offices
HOLLAND & KNIGHT LLP
http: //www. hlkaw. c om
202-955-3000
FAX 202-955-5564
2100 Pennsylvania Avenue, N.W.
Suite 400
Washington, D.C. 20037-3202
Atlanta
Boca Raton
Fort Lauderdale
Jacksonville
Lakeland
Miami
New York
Orlando
San Francisco
St. Petersburg
Tallahassee
Tampa
Washington, D.C.
West Palm Beach
ROSS W. DEMBLING
April 22, 1999
202-457-5953
Internet Address:
rdemblin@hklaw.com
VIA HAND DELIVERY
Ms. Jeanette Brown
United States Environmental Protection Agency
Director, Office of Small and Disadvantaged
Business Utilization (OSDBU)
401 M Street, S.W. Mail Code 1230
Washington, D.C. 20460
Re: Draft Report of Audit on EPA Grant Awarded to the
National Association of Minority Contractors Grant
Number X-824519-01 Draft Report Number E6DEA 8-03-0025
Dear Ms. Brown:
On behalf of the National Association of Minority Contractors ("NAMC"), I
am hereby forwarding the written comments of NAMC to the above-captioned
Draft Report. These comments are submitted to you and your office as directed
by Carl A. Jannetti, Divisional Inspector General for Audit, Mid-Atlantic
Division in his March 12, 1999 letter forwarding the draft report.
Please feel free to contact me or Samuel A. Carradine should you have
any questions or concerns regarding this submission.
Sincerely yours.
T/~\T T A ATT\ 0_ T/MT/^TTT T T T>
RWD/kh
Enclosure
FCHl #10273 vl

-------
Ms. Jeanette Brown
April 22, 1999
Page 2
cc: Carl A. Jannetti (w/encl.)
Divisional Inspector General for Audit
U.S. Environmental Protection Agency
1650 Arch Street
Philadelphia, PA 19103-2029

-------
Comments on Draft Report Number E6DEA 8-03-0025 (March 12, 1999)
(Grant Number X-824519-01)
The National Association of Minority Contractors ("NAMC"), together with
its subgrantee, the Minority Business Enterprise Legal Defense and Education
Fund ("MBELDEF") is pleased to provide its comments on Draft Report Number
E6DEA 8-03-0025 ("Draft Report") issued by the Mid-Atlantic Division of the Office
of Inspector General ("IG"). For the reasons set forth below, NAMC believes that
certain of the findings of the Draft Report are based on a mistaken or incomplete
view of the performance of the grant by NAMC and MBELDEF. Moreover, the
Draft Report fails, on several significant occasions, to consider fully the impact of
the EPA's program office mission requirements and the collateral impact on the
grant performance requirements. Consequently, NAMC respectfully contends that
the final recommendation contained in the draft report is unfounded. NAMC,
together with MBELDEF, continues to be ready, willing, and able to fully complete
the grant, in full conformity with the expectations of the EPA program office and
with the Congressional mandate that authorized and funded the grant.
The comments contained herein are provided in five parts: a Background
section, which includes a discussion and clarification of the work that has been
performed to date by NAMC and its subgrantee, MBELDEF and the tasks that are
yet to be completed; a discussion of Scheduling and Other Performance Impact
Problems that have caused delays in completion of the tasks, a discussion of The
Legal Framework around which the grant is structured, which has implications
for the interpretation of work requirements, work completed, and the rationale for
being allowed to complete the work; a Summary Recommendation by NAMC
with justifications as to why and how the work might be completed; and a last
section on Specific Findings, Cost Questions and NAMC Responses.
BACKGROUND
In September, 1995, NAMC submitted a grant proposal to the EPA's Office of
Small and Disadvantaged Business Utilization entitled "A Proposal To Conduct
Compliance Monitoring, Outreach and Opportunity Exchange (OPEX) Conferences
Related to State Utilization of DBES For EPA-Granted Procurement." NAMC
submitted the proposal in response to the mandates of the House Appropriations
Subcommittee set forth in House Report No. 103-555. In this Report, the
Appropriations Subcommittee earmarked funds to be used as follows:
$500,000 for OSDBU's environmental justice and monitoring efforts.
The Committee directs that these funds be split between activities for
monitoring of states' eight percent goal efforts and outreach of
environmental justice activities to be carried out by a non-profit

-------
minority organization with a proven track record with OSDBU's minority
programs. House Report 103-555 (accompanying H.R. 4624) (FY 95
appropriation) June 22, 1994 at page 49.
In its proposal, NAMC outlined its intended collaboration with the
MBELDEF to meet the Congressional mandates of this program. The proposal set
forth the experience and expertise that both organizations had for this endeavor,
thereby establishing that the work would be done by a "non-profit minority
organization with a proven track record with OSDBU's minority programs." The
proposal also noted that NAMC had been a grantee to EPA for five years and had
successfully provided training for over 2,000 minority and women contractors and
their employees in a variety of complex environmental subjects, including asbestos
abatement, lead-based paint abatement, underground storage tank removal and
installation, radon mitigation and hazardous waste removal/Superfund health and safety.
Additionally, as part of these grants, NAMC conducted trade fairs in which numerous
prime contractors could network with disadvantaged business enterprises (DBEs) that
had completed the training. This networking fostered the goals of one of OSDBU's
primary missions — to introduce the large companies and DBEs to each other for joint
venture and subcontracting opportunities.
NAMC's submission also set forth the proposed budgets of both NAMC and
MBELDEF. (Copies of the proposed budgets are set forth at Appendix A, attached
hereto). OSBDU awarded the grant on September 25, 1995 incorporating, fully and
without change, NAMC's proposal.
As originally awarded, the grant envisioned that NAMC would conduct Outreach
Activities and Opportunity Exchange ("OPEX") conferences in each of EPA's ten
regions ("OPEX I"). Additionally, there were to be five in-depth state studies. The
original 18 month project period extended from October 1, 1995 through March 31,
1997. In early, 1996, EPA made changes to these tasks. Seven of the ten OPEX
conferences were replaced by four needs assessments. The number of state studies
remained unchanged ("OPEX II"). While this change in the work was not formally
issued by an amendment to the Grant, there does not appear to be any dispute by the I.G.
that this change indeed had been made. (See page 4 of the Draft Report at
footnote *).
By Amendment No. 1 to the Grant dated January 30, 1997, the project period
was extended by six months - from March 31, 1997 through September 30, 1997. Prior
to September 30, 1997, the grant period was again extended to June 30, 1998.
On March 12, 1997, OSDBU increased the funding for the Grant by $250,000.
This funding was to support two additional needs assessments and five more state
studies. Significantly, despite the 50% increase of needs assessments and 100%
FCHl #10142 vl
2

-------
more state studies than originally contemplated, the project period was not extended at
that time.
From the very beginning of the grant, there were inordinate and sometimes
inexplicable delays in moving the project forward, especially in generating
correspondence from EPA to the regions and the states and in the subsequent
replies and scheduling of the various site visits, needs assessments, and other
contacts. Although the grant was signed on September 25, 1995, it was not until
early February of 1996 that the states for the first round of compliance monitoring
had been preliminarily identified. Letters were sent by EPA/OSDBU to state
environmental offices in the District of Columbia, New York, Oregon and Kansas
on March 12, 1996, indicating that they had been selected for compliance
monitoring by the NAMC/MBELDEF team and copies of these letters were sent to
the appropriate Regional Administrators. As late as September 25, 1996, more
than one year after the grant had been signed, initial letters from Leon Hampton of
EPA/OSDBU were going out to Regions II, VII, and VIII indicating that NAMC
would be contacting them regarding setting up a needs assessment meeting.
Because of staffing changes in the New York region (Region II), NAMC was not able to
contact the appropriate person to schedule a meeting until November of 1996,
and the actual meeting did not occur until July 1997. In the case of the District of
Columbia, neither NAMC or EPA have been able to determine the appropriate office
within District government with whom we might meet to discuss the OPEX grant
and EPA's desire to include the District as one of the locales for a compliance
monitoring effort.
We should point out that the compliance monitoring activities under the
OPEX grant did not necessarily meet with enthusiasm by the state environmental
agencies, especially for those states who were well below meeting their utilization goals.
It is therefore understandable that there might have been some foot
dragging by the states on the various approvals and scheduling associated with this effort
and this did play a part in the delays.
As of the time the I.G.'s audit commenced in July, 1998, four state studies,
one conference and four needs assessment remained to be completed. In the case of
the state compliance monitoring reviews, MBELDEF has completed three state
reviews in full and substantially completed three others, needing only the data
analysis and report. NAMC has instructed MBELDEF to complete the analysis
and prepare a report for the additional three states and provide it to NAMC for
submission to EPA as soon as possible. It is anticipated that this report will be
submitted within the next few weeks. NAMC had also completed two needs
assessments and, upon EPA/OSDBU approval, are in position to conduct two more
needs assessments immediately.
FCHl #10142 vl
3

-------
The following summary recounts those tasks that were assigned to
MBELDEF under OPEXI & II, those tasks that have been completed to date and
those tasks that are not yet completed.
ASSIGNED TASKS FOR OPEX I & II
The following tasks were assigned to MBELDEF under each of its State
Compliance Reviews for implementation of the Grant:
1.	Initiate contact with state environmental protection agency personnel
identified by U.S. EPA.
2.	Send document request to state environmental protection agency.
3.	Schedule and conduct site visits at state offices to review and collect
documents.
4.	Schedule and conduct interviews of state personnel responsible for
program implementation.
5.	Conduct interviews of prime contractors and MBE/WBE subcontractors.
6.	Conduct contract file analysis of sample state environmental contracts.
7.	Draft written report summarizing findings and recommendations for the
states under review for the current round of OPEX Compliance Reviews
(i.e., OPEX I or OPEX II).
TASKS COMPLETED TO DATE FOR OPEX I & II
As of the date of this memorandum, MBELDEF has undertaken and
completed the following tasks for states identified by U.S. EPA under OPEX I and
OPEX II Compliance Reviews:
1. Initiated Contacts With State Personnel
A.	OPEX I (Florida, Louisiana, and Ohio)
B.	OPEX II (New Jersey, North Dakota, Texas)
FCHl #10142 vl
4

-------
2.	Sent Document Requests
A.	OPEXI (Florida, Louisiana, and Ohio)
B.	OPEX II (New Jersey, North Dakota, and Texas)
3.	Completed Site Visits and Document Collection
A.	OPEX I (Florida, Louisiana, and Ohio)
B.	OPEX II (New Jersey, North Dakota, and Texas)
4.	Interviewed State Personnel Responsible for Program Implementation
A.	OPEX I (Florida, Louisiana, and Ohio)
B.	OPEX II (New Jersey, North Dakota, and Texas)
5.	Completed Interviews of Prime Contractors and MBE/WBE
Subcontractors
A.	OPEX I (Florida, Louisiana, and Ohio)
B.	OPEX II (New Jersey, North Dakota, and Texas)
6.	Completed Contract File Analysis
A.	OPEX I (Florida, Louisiana, and Ohio)
B.	OPEX II (none)
7.	Completed Draft Reports
A.	OPEX I (Florida, Louisiana, and Ohio)
B.	OPEX II (none)*
[*The Draft Report for OPEX II States is on hold pending direction from EPA as
to which States are to be included in the analysis for this round of Compliance
Reviews.]
UNFINISHED TASKS FOR OPEX II
All tasks for OPEX I have been completed by MBELDEF. The following tasks
under OPEX II Compliance Reviews are not yet completed by MBELDEF:
FCHl #10142 vl
5

-------
1.
The State of New Jersey
A.	Contract File Analysis
B.	Drafting of Report
2.	The State of North Dakota
A.	Contract File Analysis
B.	Drafting of Report
3.	The State of Texas
A.	Contract File Analysis
B.	Drafting of Report
4.	The State of Colorado
A. All seven tasks outlined in first section of this memorandum.
5.	The State of Tennessee
A. All seven tasks outlined in first section of this memorandum.
SCHEDULING AND OTHER PERFORMANCE IMPACT PROBLEMS
There were numerous modifications by the EPA to the list of states originally
designated for Compliance Reviews under OPEX I and OPEXII. Moreover, there
were a number of states that were targeted for these Compliance Reviews that, for a
variety of reasons, were withdrawn, added back to the list, and withdrawn again as
subjects for the Compliance Reviews.
It is critically important to appreciate the adverse impact caused by the delay
in identification of participating states and the associated projects. The needs
assessments and conference sites were driven by the decisions on which states
would have state studies. For no needs assessments or conferences would be
conducted in those states in which a state study was to be conducted. In the
absence of clear identification of states matched with the project to be conducted the
entire project was necessarily delayed.
That is precisely what occurred during this grant. The identification of
where the state studies would be conducted were on critical path. Delays in this
identification delayed everything. Likewise, the states in which a needs assessment
would be conducted traveled on a parallel critical path. If the needs assessment
states could be identified, such state would not have a state study. But again, any
FCHl #10142 vl
6

-------
delay in the clear identification of either the state study or needs assessment
location delay everything scheduling is similar to a construction project's critical
path method (CPM) of planning and management. This method organizes and
schedules the numerous interrelated separate small tasks that make up a complex
project. Some of the tasks may be done at any time during a given period without
having any effect on completion of the entire project. Some tasks, however, must be
performed on schedule and in sequence else the entire project will be delayed.
These latter tasks are on the "critical path." Any delay of work along the critical
path will adversely affect the entire project.
There was a lack of cooperation from Colorado and the District of Columbia
in scheduling initial site visits, interviews with state personnel, and document
review. For example, the District of Columbia was initially projected as a subject
for Compliance Review in the first round of OPEX I. However, the District
Government failed to communicate with the EPA and identify contact persons for
the District's environmental protection offices that had possession of crucial
contract files. Consequently, this Compliance Review was postponed to OPEX II.
These problems with the District Government remain unresolved and this
Compliance Review remains impossible to complete for reasons beyond the control
of NAMC, MBELDEF, or the EPA.
Similarly, there were significant delays as EPA sought to establish initial contacts
with some of the states to facilitate initial site visits by NAMC/MBELDEF. These delays
were caused by various circumstances, most notably, apparent lack of cooperation with
EPA by state administration officials.
As a result, NAMC's and MBELDEF's planned allocation of manpower was
severely impacted. The overall efficiency in scheduling of tasks suffered greatly.
Staff that had initially been trained and dedicated to this project subsequently left
or were assigned to other projects. Due to the increased length of this project, labor
and overhead costs for this project soared far above what had initially been
projected in the budget submitted for this project. NAMC and MBELDEF both had
to retain personnel and consultants to be available for the completion of this project,
even though the project was not continuing at the desired pace.
THE LEGAL FRAMEWORK
At the outset, it is essential to appreciate that a grant is fundamentally
different from a procurement contract in a variety of ways relevant to this matter.
Pursuant to the Federal Grant and Cooperative Agreement Act, a grant instrument
is required to be used when
(1) the principal purpose ... is to transfer a thing of value
to the . . . recipient to carry out a public purpose of support
FCHl #10142 vl
7

-------
or stimulation authorized by a law of the United States. .
2)substantial involvement is not expected between the
executive agency and the . . . recipient when carrying out
the activity contemplated in the agreement.
31 U.S.C. § 6304.
This is in contrast to a procurement contract, which is to be used when
(1) the principal purpose ... is to acquire (by purchase,
lease, or barter) property or services for the direct use of the
United States Government; or (2) the agency decides in a
specific instance that the use of a procurement contract is
appropriate.
31 U.S.C § 6303.
Thus, with a procurement contract, there is a mutual exchange of benefits — the
Federal Government's funds for the contractor's services or products. There is
no similar mutuality of benefit exchange in a grant. The Federal Government does
not receive a direct benefit in return for the funding; rather, the benefit flows away
from the Government to the grant recipient for the broader stimulation and support
of the public purpose fostered by the grant program.
Grant funds are, of course, not without some rules imposed by the
Government. The Draft Report quite correctly identifies those governing principles
that are applicable to the subject grant. It is important to note, however, that the
various cost principles are subject to considerably more flexibility than
procurement contract cost principles. For example, where a grantee has not kept
adequate records, evidence of satisfactory progress on the grant may nevertheless justify
a limited "presumption of regularity" since by inference the grantee must have incurred
some allowable expenses. B-186166, August 26, 1976.
Indeed, the U.S. Comptroller General has noted that
It consistently has been held with reference to Federal grant
funds, that when such funds are granted to and accepted by
the grantee, the expenditure of such funds by the grantee
for the purposes and objects for which made [is] not subject
to the various restrictions and limitations imposed by
Federal statute or our decisions with respect to the
expenditure, by Federal departments and establishments, of
appropriated moneys in the absence of a condition of the
grant specifically providing to the contrary.
43 Comp. Gen. 697, 699 (1964).
FCHl #10142 vl
8

-------
The request that NAMC, together with MBELDEF, be permitted to continue
performance of the grant by completing the four state studies, one conference and
four needs assessments is in the best interests of the EPA as well as the minority
business community - the true beneficiaries of this grant program. The very core of
NAMC's mission precisely parallels the Congressional mandate articulated in the
grant legislation to monitor and promote the EPA OSDBU's minority programs.
Depriving the NAMC of the opportunity to complete its important work under the grant,
by requiring a repayment of over $636,000 would be a disservice to this
mandate and the missions of OSDBU and NAMC.
Granting NAMC the opportunity to continue the grant performance would
not be inconsistent with appropriate grant management. Indeed, the Comptroller
General has approved crediting indebtedness arising from disallowed grant costs by
crediting the indebtedness against allowable indirect grant costs. This has been
accomplished by requiring the recipient to document that it was expending the
amount of earned costs on approved program grants, thus maintaining the agreed-upon
performance level. See, for example. B-186166, August 26, 1976.
Moreover, it must be emphasized that NAMC does not seek additional grant
funds to complete performance, only the opportunity to perform using the funds
already provided. In those cases in which a grantee has not received the full
funding before the disallowance of costs, the granting agency typically withholds
the release of the funds, subject to further performance.
The theory behind withholding is that where a grantee
has misapplied grant funds, or in other words, where a
grantee's costs are disallowed, the grantee has in effect,
spent its own money and not funds from the grant.
Withholding may be viewed as the determination that an
amount equal to the disallowed costs remains available for
expenditure by the grantee and is therefore carried over
into the new budget period.
Principles of Federal Appropriations Law.(2nd ed.) GAO/OGC-92-13, page 10-92.
There can be no question that the recording of time on a daily or more
frequent basis is the most desirable from a strict accounting standpoint. Likewise,
no question has been (or could be) raised that the personnel costs were not, in fact,
incurred. As was noted above, the Comptroller General has approved a
"presumption of regularity" in the face of inadequate records, where, as here, there
is a clear inference that the grantee must have incurred the costs. B-186166, supra.
Consistent with this presumption of regularity, the costs are indeed supported.
FCHl #10142 vl
9

-------
By its nature, the determination of reasonable costs is largely a factual one.
The Draft Report does not specify what it is about those costs that lead to the
allegation of unreasonableness, other than to tie the payments to the amount of
work performed under the grant.
The Draft Report further alleges that certain costs are not allocable under
the principles set forth in OMB Circular A-122. Reference to the definition of an
allocable cost in the Circular reveals that the I.G. has misinterpreted the nature of
allocability in the grant context. The Circular provides that
a.	A cost is allocable to a particular cost objective, such
as a grant, contract, project, service or other activity, in
accordance with the relative benefits received. A cost is
allocable to a Federal award if it is treated consistently with
other costs incurred for the same purpose in like
circumstances and if it:
(1)	Is incurred specifically for the award.
(2)	Benefits both the award and other work and can be
distributed in reasonable proportion to the benefits
received, or
(3)	Is necessary to the overall operation of the
organization, although a direct relationship to any particular
cost objective cannot be shown.
b.	Any cost allocable to a particular award or other cost
objective under these principles may not be shifted to other
Federal awards to overcome funding deficiencies, or to
avoid restrictions imposed by law or by the terms of the
award.
OMB Circular A-122, §4. Allocable costs.
It is clear that the definition does not require any degree or quality of
performance of the grant to be considered allocable; rather, what is necessary is
that there is a connection or relationship to the grant. The "benefits received"
element of § 4(2) is often the critical focus of the inquiry. A U.S. Court of Claims
decision considering the definition of allocability in the narrower procurement
contract cost context, explained that
The requirement of "benefit" may have a more or less
general scope depending upon the type of expense. Also,
the scope may be conditioned by policy considerations . . .
[The regulation] allows allocation if the cost "benefits both
FCHl #10142 vl
10

-------
the contract and other work" ... or "is necessary to the
overall operation of the business" [§ 4(3)]. . . These
conditions are in the disjunctive, but for certain costs, they
feed back and should be read as complementing each other.
For example — franchise taxes are necessary to the overall
operation of the business if their payment is a prerequisite
to "doing business." The obvious benefit results from this
fact. Additionally, as a matter of policy, it is fair to spread
such a tax around to all customers . . . Again, benefit
follows from the broad necessity, and no burden is imposed
on the contractor to prove a specific relationship to the
contract. . .
Lockheed Aircraft Corp. v. U.S.. 375 F.2d 786 (Ct.Cl. 1967) (emphasis supplied).
Additionally, the I.G.'s views with respect to MBELDEF's costs and related
justification and support needlessly obscures and otherwise ignores several
significant points. First, and foremost, MBELDEF was not a "contractor" but
rather a sub grantee. Thus, the I.G.'s reliance on traditional procurement rules is
misplaced. Moreover, MBELDEF's budget and costs were included in the original
grant proposal by NAMC where the relationship between the two organizations for
performing the grant was detailed. (A copy of this proposal, containing
MBELDEF's budget and rates is attached as Exhibit A.) EPA's acceptance of the
grant proposal was without reservation. With the full disclosures and acceptance
by EPA of the costs and nature of the MBELDEF work, the I.G.'s concerns are fully
put to rest.
In the present case, NAMC does not look to a release of withheld grant
funding. The various extensions of the project period and changes in the work
clearly suggests that there was no particular deadline for the final completion of the
grant. Allowing the completion as outlined below will not adversely affect any EPA
program or policy initiatives. In fact, completion would only serve to achieve the
goals and expectations of this grant.
SUMMARY RECOMMENDATION BY NAMC
The objective of the OPEX grant is to increase identification and access of
contracting opportunities to small and disadvantaged contractors in the
environmental services area. The effort was to be in concert with NAMC's activities
in environmental training of small and disadvantaged contractors and would
determine support requirements and innovative approaches to increasing contractor
access, as well as raise the level of public awareness and knowledge of
environmental contracting opportunities. This objective was deemed important
enough for the House Appropriations Subcommittee to earmark funds in FY 1995
FCHl #10142 vl
11

-------
for its implementation. In the more than three years that have transpired, in the
wake of the Adarand decision, Federal agencies have had to modify and adapt their
small and disadvantaged business programs to Adarand's narrow tailoring
mandate. As a result, the objective of OPEX has become increasingly important as
opportunities for contracting have diminished significantly.
In addition, because of cutbacks in grant funding and a leveling off of
membership funds and other means of support, NAMC and MBELDEF are in
precarious financial positions. Both organizations are working diligently to improve
negative fund balances, while continuing to provide the legal assistance, training
and other services that their constituencies need and deserve in this more
challenging contracting environment. Having to absorb the level of indebtedness
suggested by the IG Draft Report, without the opportunity to complete the work and
mitigate the financial exposure, would effectively immobilize these organizations
and deprive the minority contractor community of two of its most vocal advocates
and service providers. Between them, NAMC and MBELDEF have over 50 years of
dedicated service to minority business development. They were chosen for this
OPEX effort because the objective of OPEX coincides with the missions of these
organizations. The public good would be therefore ill-served if they are deprived of
the opportunity to work out of the situation with OPEX through completion of the
grant tasks.
Therefore, NAMC respectfully requests that the IG recommendation include
the opportunity for NAMC to complete the remaining work as outlined in these
comments. Although no additional EPA funds would be required, completion of the
work would involve the active participation of the EPA/OSBDU office, especially in
identifying the states for the remaining compliance reviews, the regions and states
for the remaining needs assessments, and the locale for the remaining conference.
Once these sites have been identified and regional and state approvals are obtained
to go forward, we would be able to complete all remaining tasks and present the
reports on this work within a 90-day period.
SPECIFIC IG FINDINGS, COST QUESTIONS AND NAMC RESPONSES
The specific items of costs questioned in the Draft Report are addressed
below. The Draft Report findings and explanation are set forth in italics, with the
NAMC response following.
Deliverables
(See Background discussion on work completed, work remaining and reasons for
delay in completion.)
FCHl #10142 vl
12

-------
Conferences
The IG Draft Report questions the two hour participation of OPEX
individuals in the two conferences that were held, as opposed to a full day of OPEX
activity. The IG Draft Report fails to realize that these conferences were in fact full days
or more and NAMC/OPEX staff were involved in the planning and logistics of
the full conferences, including identifying other resources and identifying major
environmental contractors with whom the minority contractors might meet to
discuss possible contracting opportunities. The direct OPEX portion of the agenda
was understandably brief because it merely involved outlining to the conference
participants how the OPEX effort worked and how they might avail themselves of
the individuals and resources that were assembled at the conferences. In addition
to the overall planning, NAMC staff and Board members participated in other
aspects of the conferences. For example, an NAMC Board member led the session
on Partnering at the Hartford, Connecticut conference and his involvement and
participation was a direct result of OPEX viewing partnering as an important
aspect of minority contractors more effectively availing themselves of environmental
contracting opportunities. In fact, after the Hartford conference, the OPEX Project
Director received a letter from the EPA Regional Administrator commending the
efforts of NAMC, highlighting the fact that over 200 individuals participated in the
conference, and expressing a desire to work with NAMC in the future. (See
November 6, 1996 Region I Administrator's Letter, attached as Exhibit B.)
Value to EPA of Work Performed
The IG Draft Report raises the issue of the utility of the state compliance
review work performed for EPA if it is not in the form of a final report. Even in its
interim stages, the state studies have had utility for EPA. For example, at
OSDBU's Annual MBE/WBE Conference held on December 9, 1996, the
NAMC/MBELDEF team was able to present findings from its first round of studies
to OSDBU representatives from around the country. We also made a presentation
on the political climate for MBE/WBE programs in the post-Adarand environment
and provided a review of the revised EPA guidelines for state programs that these
OSDBU representatives would be responsible for monitoring.
Although the IG Draft Report acknowledges that four needs assessments
were substituted for seven conferences as deliverables under the OPEX grant, the
report does not acknowledge that the meetings that were held with regional EPA
staff in Philadelphia and with regional and state environmental officials in New
York constitute needs assessments in fulfillment of the task requirements.
EPA/OSDBU representatives from these regions, as well as the EPA/OSDBU OPEX
Project Officer were in attendance at these meetings. NAMC takes the position
that these meetings were in fact the needs assessments in that discussions took
place with respect to what the situation was in these locations, what issues were
FCHl #10142 vl
13

-------
important to enhancing small and disadvantaged contractor opportunity, and what
options for support were available through EPA/OSDBU. In the case of the New
York meeting, we were also able to report on the findings of state studies that had
already been conducted under the grant as well as the experience in outreach and
public awareness gained from the two OPEX conferences in which NAMC had been
involved. The fact that no minutes or reports were written for those meetings does
not impact the fact that they took place. As in the case of the conferences, the
deliverable was the event itself and NAMC served as convener and facilitator for
these meetings, thereby fulfilling its grant obligation in these two instances.
NAMC Cost Sharing
NAMC acknowledges that at the time the IG initiated its audit of OPEX no
cost sharing dollars had been expended by NAMC or its sub-grantee MBELDEF.
NAMC also acknowledges that the amount of cost sharing requirement under the
grant was approximately $40,000. However, by June of 1998 when the last
extension of OPEX was about to expire, there was no indication that EPA/OSDBU
was dissatisfied with NAMC's performance, nor was there any indication that a
further no-cost extension would not be granted. The EPA/OSDBU had on many
occasions acknowledged that there were delays on the project that were outside the
control of either EPA/OSDBU or NAMC/MBELDEF. This was the logic that had
prevailed in the previous two extensions and the circumstances had not changed
greatly as of June, 1998. NAMC/MBELDEF was in the process of completing the
reports on three state studies and scheduling needs assessments for Mississippi and
Alabama at the time of the EPA/IG audit. There was every indication that
NAMC/MBELDEF would complete these state study reports, conduct the needs
assessments and schedule the additional state studies, needs assessments and the
conference that was required. NAMC was also aware that since direct EPA dollars
under the grant had been exhausted, the cost sharing dollars of NAMC/MBELDEF
would come into play at this point to help in covering labor, travel and other costs
associated with completing the project. With cost sharing, there is no requirement
that the grantee contributions spread over the life of the project and it is common
practice for grantee contributions to be utilized at the end of grants after direct
grant funds have been expended.
1. Personnel Costs:
a. $116,305 unsupported.
We believe that for time sheets to show reasonable estimates of actual hours, the
estimates should be made daily or shortly after the actual work is performed and
should not be based on a predetermined, consistently applied percentage of the
employee's time.
FCHl #10142 vl
14

-------
NAMC RESPONSE:
The time sheets that were submitted to NAMC on a bi-weekly basis
accurately reflect the daily work efforts on OPEX and other NAMC activities. Had
the time been recorded on a daily basis as opposed to bi-weekly, our position is that
there would be no difference in the time allocations for the given days. The time
sheets accurately reflect annual leave, sick leave, holidays, etc., as well as time
charged to the various NAMC projects and other NAMC activities. The vast
majority of the labor charged under OPEX was for Samuel Carradine, OPEX Project
Director. Contrary to the IG Draft Report, in examining the 64 time sheets in
which Mr. Carradine had OPEX charges, there were daily variations in OPEX hours
in 13 of the time sheets. In addition, for the remaining 51 time sheets, the OPEX
levels of effort were the same each day for a given time sheet, but varied from one
time sheet to the other, depending on the extent of OPEX activity, with a 4 hour
daily effort being the most common (19 time sheets). NAMC therefore contends
that $116,305 in personnel costs are supported by the time sheets.
NAMC acknowledges that an estimated $116,305 in Personnel costs were
deemed ineligible because the work has not been completed. It is our understanding
that should the work be completed at no additional costs to EPA, these ineligible
costs could then be deemed eligible.
b.	$116,305 ineligible.
This amount is considered ineligible because the costs were not reasonable or allocable
in accordance with OMB Circular A-122. The Circular provides a cost is reasonable if
it does not exceed that which would be incurred by a prudent person under the
circumstances prevailing at the time the decision was made to incur the
costs. Moreover, the Circular states that a cost is allocable to a grant in accordance
with the relative benefits received. We do not consider it reasonable to pay NAMC
the full authorized grant payments while they completed only a small portion of the work
required by the grant.
c.	$14,538 ineligible.
In addition to these expenditures being ineligible for the reasons stated above,
we also questioned $14,538 (l/8th of the personnel costs) as ineligible because NAMC
employees were paid for a one-hour lunch during an eight-hour work day. A paid
lunch was considered an employee benefit and the hours were billed directly to the
NAMC projects. OMB Circular A-122 states that a cost is allocable to an award if it
both, benefits the award and is necessary to the overall operation of the organization.
We believe the lunch policy does not benefit the EPA grant and is not necessary for
the overall operation of the organization.
FCHl #10142 vl
15

-------
NAMC RESPONSE:
Of the $14,538 in personnel costs deemed ineligible because they represented
paid lunch hours, the IG Draft Report does not reflect actual NAMC policy and practice.
The NAMC Statement of Personnel Policy does not specifically speak to
lunch hours but states unequivocally that the work week consists of 40 hours. It
further states that there is a flexible work schedule with the work day to commence
between 8:00 am and 9:30 am. (A copy of the relevant portion of this Personnel
Policy is attached as Exhibit C.) In practice, each employee puts in 8 hours of work,
exclusive of time taken for lunch. For example, an Administrative Assistant
worked from 8:00 am to 5 pm and took a one-hour lunch. The OPEX Project
Director generally works from 9:30 am to 6:30 pm and takes one hour for lunch. NAMC
therefore contends that $14,538 should be reinstated as eligible costs under Personnel.
Burden Rates
For the three Fiscal Years in which there were OPEX costs, the provisional
rates applied by NAMC were 25% for Fringes and 48% for Overhead. However, for
each of these Fiscal Years, the actual rates based on end-of-year financial
statements were somewhat higher. If actual rates are applied, the allowable
personnel costs to NAMC under OPEX would increase. Calculations of these actual
rates were provided to the IG by our accountant, but were not utilized in the
subsequent calculations. NAMC requests that actual burden rates be utilized in
calculating the loads on personnel for fringes and overhead.
2. Contractual Expenditures:
a. $340,667 ineligible.
(1). $229,517. MBELDEF estimated that each state study would
cost $32,000 to complete. NAMC paid MBELDEF $325,517
although MBELDEF completed only 3 of the 10 studies required.
Therefore, we accepted $96,000 ($32,000 X 3) and considered the
remaining $229,517 as ineligible because the cost was
unreasonable and unallocable in accordance with OMB Circular
A-122.
In addition to completing only three state studies, MBELDEF
gathered data at another three states but had not compiled the
information into a report. Therefore, the cost was not allocable to
the grant because the raw data, in and of itself, does not benefit
the grant. In accordance with OMB Circular A-122, these costs
were considered ineligible.
FCHl #10142 vl
16

-------
$18,735. The conference consultant was budgeted to receive
$18,000 or $1,800 per conference. NAMC paid the consultant
$22,335 although only 2 of the required 10 conferences were
conducted. Therefore, we accepted $3,600 ($1,800 X 2) and
considered the remaining $18,735 as ineligible. OMB Circular
A-122 states that a cost is allocable to a grant in accordance with
the relative benefits received. We do not consider it reasonable
that NAMC paid the conference consultant $22,335 to coordinate
two conferences, considering that $18,000 was intended to pay for
all ten conferences.
We considered the $92,282 paid to four consultants ineligible.
Two consultants were under contract for only part of the period,
and we determined that the consulting services provided were
generally not allocable to the grant. For example, one consultant
was paid $ 78,093 to provide legal services to NAMC. Originally,
the consultant completed time sheets. Then NAMC paid him
$2,000 every two weeks as a retainer. In total, the consultant was
paid $64,000 ($2,000 X 32 payments) in this manner. On 32
invoices the consultant indicated that 4% to 80% of his effort was
classified as "Other NAMC. " NAMC's Executive Director
explained these "Other NAMC " hours were not grant related and
were erroneously charged to the grant. We calculated that more
than $21,000 was mischarged in this manner. Additionally,
there was no support to show the remaining effort was allocable to
the grant.
For the remaining two consultants, there were no consulting
agreements executed between NAMC and the consultants as
required by OMB Circular A-122. Without the required
consulting agreements, NAMC had no support indicating what
consulting services were provided. In particular, we could not
determine what portion of the services, if any, were allocable to
the grant. The Circular provides that to determine the
allowability of costs, some of the relevant factors are:
Adequacy of the contractual agreement for the service
(e.g., description of the service, estimate of time required,
the rate of compensation, and termination provisions).
The nature and scope of the services rendered in relation
to the service required.
17

-------
The qualifications of the individual rendering the service
and the customary fees charged.
In addition, the consulting costs are ineligible because NAMC
did not procure the consultants in accordance with 40 CFR 30.45,
which requires grantees to use and document in its procurement
files some form of cost or price analysis for every procurement.
Price analysis may be accomplished by the comparison of price
quotations submitted, market prices, and similar indicia. Cost
analysis is the review and evaluation of each element of cost to
determine reasonableness, allocability and allowability. When
procuring the consultants, NAMC did not consider cost or perform
a price analysis. Without a cost or price analysis, EPA has no
assurance that the consulting expenditures were reasonable and
allowable.
NAMC RESPONSE:
NAMC acknowledges that an estimated $229,517 in Contractual
Expenditures were deemed ineligible by the IG Draft Report because the work has
not been completed. However, we feel that credit should be given for the completion
of an additional three state studies (the report for which will be sent to EPA shortly)
at this time, leaving the ineligible costs for this category at $130,207 (utilizing an
actual per study cost of $32,551.70 as opposed to the approximation of $32,000 in
the IG Draft Report). It is our understanding that should the work be completed at
no additional costs to EPA, these ineligible costs could then be deemed eligible.
NAMC acknowledges that an estimated $18,735 in Conference Consultant
costs were deemed ineligible because the work has not been completed. Once needs
assessments were substituted for conferences, this consultant began to assist the
OPEX Project Director in preparing for these needs assessments. Utilizing the
parameter of $1,800 for each conference and $3,150 for each needs assessment
(utilizing the 4 needs assessments for 7 conferences ratio), NAMC contends that
$9,900 should be deemed eligible costs in this category since 2 conferences and 2
needs assessments were conducted, leaving ineligible costs of $12,435. It is our
understanding that should the remaining conference and needs assessment work be
completed at no additional costs to EPA, at least $8,100 of these ineligible costs
could then be deemed eligible.
For the consultant that was paid $78,093, NAMC acknowledges that
approximately $21,000 in charges were for "Other NAMC" activities. However,
approximately 50% of the remaining $57,000 should be deemed eligible because the
consultant performed useful work in support of the grant. In addition to participating in
the initial planning for the grant, this consultant participated in the drafting of the
FCHl #10142 vl
18

-------
statestudy survey materials, contributed to the presentation to OSDBU representatives in
December of 1996, with a special emphasis on the legal and legislative fallout of the
Adarand decision, and continued to monitor these issues in preparation for utilization in
the compliance monitoring reviews, the needs assessments and presentation at OPEX
conferences. The consultant personally presented the information at the Hartford
conference and provided the Conference Consultant with a briefing for use during the
Seattle conference. Using the parameters of work completion ratios that have been
applied in the IG Draft Report and elsewhere in these responses, NAMC calculates that
$28,939 of this consultant's costs should be deemed eligible. It is our understanding that
should the OPEX work be completed at no additional costs to EPA, of the remaining
$49,154 in ineligible costs for this consultant, at least $28,061 could then be deemed
eligible. In addition, this consultant brought specialized knowledge of Federal
procurement, affirmative action laws and legislation, and regulatory/compliance
procedures to the grant that was cost-beneficial. Given this level of relevant capability,
the consulting costs were deemed reasonable. Furthermore, the resumes and rates of the
key consultants were presented to the EPA/OSDBU as part of the original NAMC
OPEX proposal and their participation was implicitly accepted by EPA/OSDBU by their
incorporating the NAMC proposal in total as the Scope of Work for the OPEX grant.
For the remaining two consultants, their roles were to provide administrative
support to OPEX. Administrative support was originally included as a personnel
line item. However, it was determined that due to the fact that OPEX would not be
an on-going effort beyond the grant period, this support would be contracted for. In
one instance, a letter of agreement was presented to the individual consultant for
signature and this letter indicated the fact that 50% of her administrative support
was to be for OPEX. Subsequent payments to the consultant had cost allocations
that reflected this percentage. Therefore, NAMC contends that approximately 50%
of the OPEX-related costs of this administrative support be deemed eligible based
on the level of work completed. It is our understanding that should the OPEX work
be completed at no additional costs to EPA, the remaining 50% of OPEX-related
costs for administrative support could then be deemed eligible.
(4). NAMC mistakenly overpaid $133 to a hotel in connection with the
conference held in Hartford, Connecticut.
NAMC RESPONSE:
NAMC acknowledges the ineligible overpayment of $133 to a hotel.
b. $24,146 unsupported.
FCHl #10142 vl
199

-------
NAMC RESPONSE:
At this time, NAMC acknowledges the unsupported costs of $24,146 in
contractual expenditures. However, we are continuing to research the issue and
hope, at some point, to be able to provide supportive documentation for these
expenditures.
NAMC did not provide receipts for these expenditures, as required by 40 CFR
NAMC RESPONSE:
NAMC acknowledges the $1,487 in unsupported telephone expenditures.
NAMC also acknowledges that an estimated $10,039 in Telephone costs were
deemed ineligible because the work has not been completed. It is our understanding
that should the work be completed at no additional costs to EPA, these ineligible costs
could then be deemed eligible.
We considered $1,487 of $21,565 incurred for telephone expenditures unsupported
because NAMC did not provide receipts as required by 40 CFR 30.21. Moreover, we
considered $10,,039 or 50% of the remaining telephone expenditures as ineligible
because the costs were not reasonable and allocable in accordance with OMB
Circular A-122. We do not consider it reasonable to pay NAMC the full authorized
grant payments while they completed only a small portion of the work required by
the grant.
4. Travel Expenditures:
a. $9,520 ineligible.
[TJhere was no indication how any of the following travel benefited the grant and thus
were not allocable to the grant.
30.21.
3. Telephone Charges:
NAMC Conference
Oakland, CA
NAMC's Corporate Lawyer
Brownfields Conference
American Bar Association
Total
$5,943
2,662
$9.520
863
27
25
OMB Circular A-122 requires that travel costs must benefit the grant in
order for these costs to be allocable.
FCHl #10142 vl
20

-------
NAMC RESPONSE:
Of the $9,520 in Travel expenditures that were deemed ineligible, NAMC
contends that least $5,970 was directly beneficial to the grant. The $5,943 in
NAMC conference costs covered the OPEX personnel who traveled to the conference
to make a major presentation on OPEX for the more than 300 contractors in
attendance. One of the acknowledged objectives of the OPEX grant is to "raise the
level of public awareness and knowledge of environmental contracting
opportunities." Again, the reason NAMC was selected for this grant is that we have
a built-in constituency that is prepared to avail themselves of these opportunities.
Over the years, NAMC has trained and certified more than 3,000 minority
contractors in various areas of environmental services contracting and it is this
target group that we are attempting to reach as part of our OPEX efforts. The
NAMC conference was a logical and opportune occasion for such outreach.
Likewise, the OPEX Project Director was invited to attend a Brownfields conference
and serve on a panel in order to provide an overview of NAMC's activities with
EPA/OSDBU, including OPEX. Also in attendance at this conference were the now-
Director of OSDBU and the OPEX Project Officer. The $27 in OPEX cost of this
conference was a proportional allocation of expenses.
NAMC contends that the $6,575 in unsupported travel be allowed because receipts
for such travel were provided, the nature of the travel was indicated, and it was clear that
the travel was related to NAMC OPEX activity.
b. $6,575 unsupported.
NAMC did not maintain documentation such as travel reports, as required by 40 CFR
30.21.
5. Other Expenditures:
a. $4,388 ineligible.
(1). $4,192. When procuring a computer for $3,246, office furniture
for $524, and office supplies for $422, NAMC did not perform the
cost or price analysis required by 40 CFR 30.45. Instead, they
selected the vendors based on past experiences and
recommendations. Therefore, we considered these expenditures
as ineligible.
NAMC RESPONSE:
NAMC contends that $3,246 in a computer purchase deemed ineligible be
allowed because the selection of the vendor was the result of a cost analysis that
FCHl #10142 vl
21

-------
included comparing the computer cost from the ultimate vendor (Gateway) with
comparable direct mail vendors (Dell) and area retail stores (Office Depot, Staples).
In addition to having the best price, Gateway had far and above the best service,
with free, 24 hour toll-free technical support. In the case of office furniture and
office supplies, a similar cost analysis had been done prior to these purchases. The
office furniture purchase was for an additional desk that NAMC had already
determined was a quality product because it was the same as other office furniture
that had been purchased over the past several years. The Office Manager examined
various office furniture catalogues before purchasing from the least expensive
vendor. Likewise, office supplies were ordered in a similar manner. NAMC
therefore contends that $524 and $422 in office furniture and office supplies, respectively,
be deemed eligible under the OPEX grant.
22

-------
Appendix 3
Distribution
EPA
Associate Administrator for Congressional and Intergovernmental
Relations (1301 A)
Associate Administrator for Communication, Education, and Media
Relations (1701 A)
Director, Office of Grants and Debarment (3901R)
Comptroller (2731A)
Audit Followup Coordinator, Office of Grants and Debarment (3901R)
Audit Followup Coordinator, Office of Administrator (1104A)
Agency Audit Followup Coordinator (2724A)
Director, Office of Small and Disadvantaged Business Utilization (1230A)
Office of Inspector General (2410)
Other
National Association of Minority Contractors

-------