Development Document for Final Effluent Guidelines and Standards
for the Construction and Development Category
Appendices A -1
November 2009
EPA-821 -R-09-010
U.S. Environmental Protection Agency
Office of Water (4303T)
1200 Pennsylvania Avenue, NW
Washington, DC 20460

-------
Appendix A
Summary of State Construction and Development
Requirements

-------
Appendix A: Summary of state construction and development requirements
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Alabama
1,800 (EPA 2007)
(1) 8-hour detention time for sites > 5
acres (EPA 2007) (2) 67 cy/acre (1,809
ft3) - (Alabama Handbook for Erosion
Control, Sediment Control and
Stormwater Management on Construction
Sites and Urban Areas June 2003,
Revised 1-06)
The 2004 TDD Section 7 notes: a sediment
basin storage volume of 3,600 ft3/acre
drained, and sediment basin requirements for
drainage areas > 10 acres.
Statewide standard varies with
background, < 50 Nephelometric
Turbidity Units (NTUs) above
background. The EPA literature
noted "None." The 2002 TDD
Appendix A notes: Turbidity <50
NTU. Turbidity limits as set forth by
the Alabama Department of
Environmental Management are 50
NTUs above background for any
Alabama waterbody with a Fish and
Wildlife classification (Alabama
Department of Environmental
Management 2001). PG
Environmental (PG) determined that
the Alabama Department of
Environmental Management-Water
Division Water Quality Program
(2006) states in its specific water
quality criteria Section 335-6-10-.09
that there shall be no turbidity other
than natural origin and that in no
case shall turbidity exceed 50 NTUs
above background.
13 days (EPA 2007)
Alaska
3,600 (2004 TDD
Section 7)
The EPA 2007 literature referenced the
CGP and noted a sediment basin volume
of 1,800 ft3/acre plus 1.5 ft for sediment
accumulation - generally designed to
remove medium silt (62 microns)
particles.
The 2004 TDD Section 7 notes sediment
basin requirements for drainage areas > 10
acres. 2002 water quality standards specify
that all stormwater treatment devices shall be
designed based on the 2-year, 6-hour rain
event (assume runoff), and the Best
Management Practice (BMP) must also be
capable of removing particles greater than 20-
microns during such an event.
The 2002 TDD Appendix A notes
total suspended solids (TSS) > 20
microns. The EPA 2007 literature
notes "None."
14 days. Reference to
the CGP (EPA 2007)
Arizona
3,600 (EPA 2007;
2004 TDD Section
7)
Sizing based on a 2-year, 24-hour event
(EPA 2007)
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007)
14 days (EPA 2007)
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
ro
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Arkansas
3,600 (EPA 2007;
2004 TDD Section
7)
Temporary or permanent sediment basins
shall be based on either the smaller of
3,600 ft3/acre, or a size based on the
runoff volume of a 10-year, 24-hour storm
event (EPA 2007).
The 2004 TDD Section 7 notes sediment
basin requirements for drainage areas > 10
acres.
PG estimated post-construction
standard only. A goal of 80 percent
removal of TSS from these flows
(e.g., stormwater detention
structures-including wet ponds),
which exceed predevelopment levels
should be used in designing and
installing, where practicable (EPA
2007; state literature).
14 days (EPA 2007)
California
3,600 (EPA 2007;
2004 TDD Section
7)
Other design standards include a settling
velocity approach, where the precipitation
intensity for a 10-year, 6-hour rain event is
used (EPA 2007).
The 2004 TDD Section 7 notes sediment
basin requirements for drainage areas > 10
acres.
California's draft CGP includes
turbidity effluent levels of 1,000 NTU.
If Active Treatment Systems are
used, the daily flow-weighted
average is 10 NTU and the
maximum for any single sample is 20
NTU.
Not specified (EPA 2007
and 2002 TDD
Appendix A). 2004 TDD
confirmed that CA has
no stabilization standard
within 14 days.
Colorado
1,800 general/3,600
transportation
N/A
The 2004 TDD Section 7 notes sediment
basin requirements of 1,800 ft3/acre drained.
The EPA 2007 literature notes sediment basin
sizing of 3,600 ft3/acre for Colorado
Department of Transportation (CDOT).
None (EPA 2007)
14 days. PERMIT NO.
COR10*##F
(http://www.epa.gov/regi
o n 8/wate r/sto rm wat e r/d
ownloads/Cof_con.pdf
states 14 days. There is
no stabilization standard
within 14 days per 2004
TDD. Douglas County
requires that disturbed
areas be drill seeded
and crimp mulched, or
permanently
landscaped, within 30
days from the start of
land disturbance
activities or within 7
days of the substantial
completion of grading
and topsoiling
operations, whichever
duration is shorter (EPA
2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Connecticut
3,600 (EPA 2007)
The EPA 2007 literature notes basin
sizing of 3,600 ft3/acre.
The 2004 TDD Section 7 notes a sediment
basin storage volume of 1,800 ft3/acre
drained. The EPA, 2007 literature noted that
sediment basins required for sites greater
than 2 acres.
PG estimated no numeric standard
for active construction sites based on
review of state literature. The EPA
2007 literature notes 80% TSS. The
2004 Connecticut Stormwater
Quality Manual, Chapter 6 states,
The State of Connecticut has
adopted the 80 percent TSS removal
goal based on EPA guidance and its
widespread use as a target water
quality performance standard. The
2004 Connecticut Construction
General Permit for Stormwater
discharges noted that the 80 percent
TSS removal was for post-
construction. The 2002 TDD
Appendix A notes an 80 percent TSS
reduction.
3 days. Where
construction activities
have permanently
ceased or have
temporarily been
suspended for more
than 7 days, or when
final grades are reached
in any portion ofthe site,
stabilization practices
shall be implemented
within 3 days. Areas that
will remain disturbed but
inactive for at least 30
days shall receive
temporary seeding.
Areas that will remain
disturbed beyond the
planting season, shall
receive long-term,
nonvegetative
stabilization sufficient to
protect the site through
the winter (EPA 2007).
Delaware
3,600 (EPA 2007;
2004 TDD Section
7)
N/A
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
PG estimated no numeric standard.
The EPA 2007 literature states
"None." The 2002 TDD Appendix A
notes an 80 percent TSS reduction;
however, PG determined from state
literature that this was a post-
construction standard.
14 days (EPA 2007)
Florida
3,600 (EPA 2007;
2004 TDD Section
7)
N/A
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
PG estimated no statewide numeric
standard. The EPA 2007 literature
states "None." The 2002 TDD
Appendix A notes some standards
for specific regions, but no statewide
requirements.
7 days (EPA 2007)
Florida, DEP,
Northern
District (only
applies in NW
Florida)



The 2002 TDD Appendix A notes an
80 percent TSS reduction.

>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Florida, South
Florida Water
Management
District
(General,
Standard
General,
Noticed
General and
Individual
Permits)





Florida,
Southwest
Florida Water
Management
District





Florida, St.
Johns River
Water
Management
District



The 2002 TDD Appendix A notes a
turbidity less than 29 NTU.

Florida,
Suwannee
River Water
Management
District



The 2002 TDD Appendix A notes an
80 percent TSS reduction.

Georgia
1,800 (EPA 2007;
2004 TDD Section
7)

The 2002 TDD Appendix A notes water runoff
from 25-year, 24-hour storm event shall be
treated for water quality management. PG
assumed the 25-year storm event is for the
emergency spillway per the 2004 TDD
("Typical return periods vary between 25 and
100 years, with 25 years recommended by
the USDOT").
Statewide standard varies with
background. Cannot increase
turbidity by more than 25 NTU in
warm waters and 10 NTU in cold
water trout streams. Allowable
turbidity in effluent varies based on
site size and receiving stream
drainage area (EPA 2007). The 2002
TDD Appendix A notes turbidity < 10
to 25 NTUs.
14 days (EPA 2007)
Hawaii
3,600 (EPA 2007)
Basin sizing for a 2-year, 24-hour storm
event for drainage areas > 10 acres (EPA
2007).

No numeric requirements for
stormwater pollutant removal have
been established at the state level,
but regional and municipal
regulations are in place (EPA 2007).
30 days (EPA 2007)
Idaho
3,600 (EPA 2007;
2004 TDD Section
7)
Basin sizing for a 2-year, 24-hour storm
event for drainage areas > 10 acres (EPA
2007).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None. None listed in EPA 2007 or
2002 TDD Appendix A.
14 days (EPA 2007)
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
cn
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Illinois
3,600 (2002 TDD
Appendix A)
No sizing criteria in permit (EPA 2007).
The 2002 TDD Appendix A notes 3,600
ft3/acre.
The 2002 Illinois Urban Manual states that the
basin requirements shall be based on a 2-
year, 24-hour storm or 134 cubic yards/acre
(i.e., 3,600 ft3/acre)—whichever is greater
(EPA 2007). General NPDES Permit No.
ILR10 5/30/2003 notes that "The
management practices, controls and other
provisions contained in the stormwater
pollution prevention plan must be at least as
protective as the requirements contained in
Illinois Environmental Protection Agency's
Illinois Urban Manual, 2002."
None (EPA 2007)
14 days (unless covered
with snow or
construction will resume
within 21 days) (EPA
2007).
Indiana
1,800 (2004 TDD
Section 7)
No sizing criteria in permit (EPA 2007).
The 2004 TDD Section 7 states that for a
state program that did not note a
sediment basin size, EPA assumed based
on best professional judgment (BPJ) that
the baseline size was 1,800 ft3/acre.
Sediment basin requirements exist for some
areas in State (EPA 2007).
Only in certain parts of Indiana (e.g.,
80 percent of TSS removal in Marion
County). (EPA 2007).
15 days (EPA 2007)
Iowa
3,600 (EPA 2007;
2004 TDD Section
7)
The 2002 permit states that a sediment
basin shall be installed for drainage area
more than 10 acres disturbed. (Flows
from upland areas that are undisturbed
may be diverted around the basin) (EPA
2007).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The EPA 2007 literature
notes: The 2006 Iowa Construction Site
Erosion Control Manual states that the size of
the sediment basin, is as measured from the
bottom of the basin to the principal spillway
and should provide at least 3,600 ft3 of
storage per acre of drainage. This provides
storage equal to 1 inch of runoff per acre.
Likewise, 1,800 ft3 amounts to 1/2 inch of
sediment storage per acre. The basin should
be cleaned when the volume of sediment
reaches 900 ft3/acre. At this time, the cleanout
shall be performed to restore the original
design capacity of the basin. At no time
should the sediment level be permitted to
build higher than 1 foot below the principal
outlet.
PG estimated no numeric standard.
The EPA 2007 literature states
"None." The 2002 TDD Appendix A
notes an 80 percent TSS reduction;
however, PG could not confirm that
this standard was for active
construction sites.
14 days (unless covered
with snow or
construction will resume
within 21 days) (EPA
2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
a>
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Kansas
3,600 (EPA 2007;
2004 TDD Section
7)
Kansas 1/30/07 CGP Definitions and
Acronyms pages states, "Sediment Basin
Design Criteria requires sedimentation
structures that receive runoff from 10
acres or more of disturbed area to provide
at least 3,600 ft3 of storage per acre of
area drained into the sediment basin.
KDHE may approve alternate storage
volumes if significant portions of
undisturbed area drain to the sediment
basin."
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The EPA 2007 literature
notes that the 2007 permit requires a storage
capacity of 3,600 ft3/acre and the Sediment
Basin Design Criteria in the permit states,
"rational method or other equivalent runoff
calculations based on storage of a 2.6 inch
rainfall event with a minimum runoff
coefficient of 0.77 for disturbed acreage and
appropriate runoff coefficients for undisturbed
acreage must be provided to determine the
revised storage volume requirement." The
field guide for Missouri and Kansas says that
for drainage areas of 20 acres or less, the
sediment storage shall be 1,800 ft3/acre with
a detention time of at least 24 hours (EPA
2007).
None (EPA 2007)
Not specified; however,
it states, "time should be
minimized" (EPA 2007).
Kentucky
3,600 (EPA 2007;
2004 TDD Section
7)
The 2002 permit requires a basin sizing of
3,600 ft3/acre for drainage locations >10
acres (EPA 2007). The EPA 2007
literature notes in the 2007 Draft Kentucky
BMP Manual requires basin sizing of
3,600 ft3/acre, not to exceed 10 acre-feet
for areas 5 to 120 acres with the goal to
provide a detention time of 24 to 48 hours
and 80 percent TSS reduction for the 10-
year, 24-hour storm.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
PG noted that there was only
numeric standard requirements for
Jefferson County and no statewide
standard. 80% TSS removal only for
Jefferson (EPA 2007). The 2002
Appendix A notes a goal of 80
percent TSS reduction (compared to
pre-construction levels). A goal of 80
percent removal of TSS from flows
that exceed predevelopment levels
(2002 General KPDES Permit for
Stormwater Point Source
Discharges, Construction Activity,
page IV-2).
14 days (unless covered
with snow or
construction will resume
within 21 days) (EPA
2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
-vl
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Louisiana
3,600 (EPA 2007;
2004 TDD Section
7)
For 10 or more disturbed acres, either the
smaller of 3,600 ft3/acre or a 2-year, 24-
hour storm. This does not apply to flows
from off-site areas and flows from on-site
areas that are either undisturbed of have
undergone final stabilization where such
flows are diverted around the sediment
basin (EPA 2007).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. For drainage locations
serving less than 10 acres, smaller sediment
basins and/or sediment traps should be used.
At a minimum, silt fences, vegetative buffer
strips, or equivalent sediment controls are
required for all downslope boundaries of the
construction area unless a sediment basin
providing storage for a calculated volume of
runoff from a 2-year, 24-hour storm or 3,600
ft3 of storage per acre drained is provided
(EPA 2007).
Not directly applicable. There are
standards for permitted support
activities related to a construction
site (cement and concrete facilities,
hot mix asphalt/asphaltic concrete
facilities, stockpiles of sand and
gravel, and non-process area
stormwater from cement, concrete,
and asphalt facilities). They establish
monthly monitoring requirements and
discharge limitations for flow
(parameters - TSS, TOC, Oil &
Grease, and allowable ranges of pH)
(EPA 2007).
14 days (EPA 2007)
Maine
3,600 (2004 TDD
Section 7)
No sizing criteria in permit (EPA 2007).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The EPA 2007 literature
states in the 2003 Erosion and Sediment
Control BMPs Manual that the capacity of the
sediment basin shall be equal to the
stormwater volume to be detained plus the
volume of sediment expected to be trapped.
Periodic removal of sediment will be
necessary to maintain basin's capacity.
Temporary basins having drainage areas of 5
acres or less and a total embankment height
of 5 feet or less may be designed with less
conservative criteria. Any excavated pond
with a drainage area in excess of 5 acres, or
spring flow in excess of 100 gallons per
minute must be designed in accordance with
embankment pond criteria. Excavated ponds
must be designed to be drained within a 10-
day period.
None (EPA 2007). The 2002 TDD
Appendix A states: 40 to 80 percent
TSS reduction. PG could not verify
2002 TDD Appendix A, and assumed
no numeric standard.
14 days. Operators
must stabilize with
mulch, or other non-
erodible cover, any
exposed soils that will
not be worked for more
than 7 days. Must
stabilize areas within 75
feet of a wetland or
waterbody within 48
hours of the initial
disturbance of the soil or
before any storm event,
whichever comes first
(EPA 2007).
Maryland
3,600 (EPA 2007)
N/A
EPA 2007 (minimum of 3,600 ft3/acre).
PG estimated no numeric standard.
None (EPA 2007). The 2002 TDD
Appendix A states an 80 percent
TSS reduction based on the average
annual TSS loading from all storm
events less than or equal to the 2-
year/24-hour storm; however, PG
could not confirm for active
construction sites.
14 days (7 days for
steep slopes) (EPA
2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Massachusett
s
3,600 (2004 TDD
Section 7)
Basin size based on the runoff volume of
a 2-year, 24-hour storm event (2002 TDD
Appendix A).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. In the EPA 2007 literature,
it is noted that EPA issues permit.
PG estimated no numeric standard.
None (EPA 2007). The 2002 TDD
Appendix A notes an 80 percent TSS
reduction; however, PG could not
confirm for active construction sites.
14 days. In the EPA
2007 literature it is
noted as 14 days with a
CGP reference.
Michigan
3,600 (2004 TDD
Section 7; 2002
TDD Appendix A)
N/A
The 2002 TDD Appendix A notes sites > 10
acres require an on-site temporary sediment
basin. The 2004 TDD Section 7 also notes
sediment basin drainage requirements for
drainage areas > 10 acres. The EPA 2007
literature notes that the 1998 Guidebook for
Best Management Practices for Michigan
Watersheds provides sediment basin design
recommendations (see longer write-up for
details) (EPA 2007). The 1998 Guidebook for
Best Management Practices for Michigan
Watersheds provides sediment basin design
recommendations. A straightforward method
requires a storage volume that is equal to 1/2
inch of runoff from the contributing watershed.
(For residential areas, 1/2 inch of runoff would
be about a 1 -year rainfall event in Michigan).
For the high percentage of particulate
pollutant removal, the detention basin should
be designed so that it will take at least 24
hours to drain the entire volume stored. (For
more information, see chapter 3 of the
guidebook).
None (EPA 2007).
15 calendar days after
final grading or the final
earth change has been
completed (EPA 2007).
Minnesota
3,600 (EPA 2007;
2004 TDD Section
7)
For 10 or more disturbed acres; (1) The
basins must provide storage below the
outlet pipe for a calculated volume of
runoff from a 2-year, 24-hour storm from
each acre drained to the basin, except
that in no case shall the basin provide
less than 1,800 ft3 of storage below the
outlet pipe from each acre drained to the
basin, (2) Where no such calculation has
been performed, a temporary (or
permanent) sediment basin providing
3,600 ft3 of storage below the outlet pipe
per acre drained to the basin shall be
provided where attainable until final
stabilization of the site (EPA 2007).
The 2004 TDD Section 7 also noted sediment
basin drainage requirements for drainage
areas > 10 acres.
None; however, where an
alternative, innovative treatment
system is proposed and
demonstrated by calculation, design
or other independent methods to
achieve 80 percent TSS removal a 2-
year monitoring plan to sample runoff
from the proposed method must be
submitted (EPA 2007).
Steeper than 3:1, 7
days, 10:1 to 3:1, 14
days, flatter than 10:1,
21 days (EPA 2007)
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CD
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Mississippi
3,600 (EPA 2007;
2004 TDD Section
7)
The Planning and Design Manual states
that the maximum allowable drainage
area into the basin shall be 25 acres. The
design capacity of the basin must be at
least 67 yd3/acre (1809 ft3/acre). The
capacity of the basin may be estimated by
40% x Height x Surface Area. The basin
spillway shall be designed to handle peak
flow from a 10-year, 24-hour storm event.
If a principal spillway is used in
conjunction with an emergency spillway,
the principal spillway shall have a
minimum capacity of 0.2 cfs per acre of
drainage area when the water surface is
at the crest of the emergency spillway.
The embankment of the sediment basin
shall be temporarily seeded within 15
days after its completion. The basin
should be designed according the
following data sheet (see more detailed
summaries in the manual) (EPA 2007).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007).
7 days. Wthin 7 days
when a disturbed area
will be left undisturbed
for 30 days or more
(EPA 2007).
Missouri
3,600 (EPA 2007)
The 2007 permit states that basins are
needed for 10 acres or more, with a basin
sizing at least 3,600 ft3/acre. In valuable
water resource areas, the sediment basin
needs to contain 1/2 inch of sediment
from the drainage and withstand the 2-
year, 24-hour storm (EPA 2007). PG
noted that the 2007 permit 2-year, 24-
hour storm event was not a statewide
requirement (applies to valuable water
resource areas).
The 2004 TDD Section 7 notes a sediment
basin storage volume of 1,800 ft3/acre
drained. The EPA 2007 literature notes that in
the 1995 Erosion and Sediment Manual the
contributing area is recommended to be 20
acres or less and sized to store a minimum of
1,800 ft3 per disturbed acre with a detention of
at least 24 hours. The site should be
vegetated and stabilized immediately after
construction.
The 2002 TDD Appendix A notes
that settleable solids less than 2.5
ml/L per hour for normal land
disturbance, and 0.5 ml/L per hour
for land disturbance within sensitive
areas. The EPA 2007 literature notes
that per the Missouri State Operating
Permit General Permit MO-R109000
3/8/2002: Construction site
discharges shall not violate Missouri
Code of State Regulations General
Water Quality Standards 10 CSR 20
7.031 (3) or exceed a maximum
settleable solids concentration of 2.5
ml/L per hour for each stormwater
outfall. If the disturbed area is near a
Valuable Resources Water settleable
solids may not exceed 0.5 ml/L per
hour.
14 days; however, if the
slope of the area is
greater than 3:1 (3 feet
horizontal to 1 foot
vertical) or if the slope is
greater than 3 percent
and greater than 150
feet in length, then
interim stabilization
within 7 days of ceasing
operations on that part
of the site is required
(EPA 2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
o
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Montana
1,800 (2004 TDD
Section 7)
No sizing criteria in permit (EPA 2007).
The 2004 TDD Section 7 states that for a
state program that did not note a
sediment basin size, EPA assumed based
on BPJ that the baseline size was 1,800
ft3/acre. The 2002 TDD Appendix A notes
a basin size based on the runoff volume
of a 2-year, 24-hour storm event. PG
could not verify the 2-year, 24-hour storm
event.
In the EPA literature, it notes in the Erosion
and Sediment Control Manual stating that
desilting basins are appropriate for areas of
disturbed soil between 5 acres and 10 acres
in size. Desilting basins shall be designed to
have a capacity equivalent to 100 m3 (1500
ft3) of storage (as measured from the top of
the basin to the principal outlet,) per hectare
(acre) of contributory area. This design is less
than that required to capture 0.01 mm (0.0004
in) particle size, but larger than that required
to capture particles 0.02 mm (0.0008 in) or
larger. The depth must be no less than 1 m (3
ft) nor greater than 1.5 m (5 ft). Basins shall
be designed to drain within 72 hours following
storm events.
The EPA 2007 literature notes that
BMPs must minimize or prevent
"significant sediment" (as defined in
Part VI of the General Permit p. 28)
from leaving the construction site.
Significant sediment means
sediment, solids, or other wastes
discharged from construction site, or
a facility or activity regulated under
the General Permit which exceeds
1.0 cubic foot in volume in any area
of 100 square feet that may enter
state surface water or a drainage
that leads directly to state surface
water.
Not specified (EPA
2007). 2002 TDD
Appendix A confirmed
no stabilization within 14
days.
Nebraska
1,800 (2004 TDD
Section 7)
No sizing criteria in permit (EPA 2007).
The EPA 2007 literature also noted that
sediment basins required for 5 acres or
more in size. Where slopes are equal to
or steeper than 3:1, sediment basins may
be required for smaller drainage areas.
The 2004 TDD Section 7 states that for a
state program that did not note a
sediment basin size, EPA assumed based
on BPJ that the baseline size was 1,800
ft3/acre.

None (EPA 2007).
14 days (Permit
NER110000)
Nevada
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes in the 2002
permit states that basin requirements for
drainage areas > 10 acres shall provided
storage of 3,600 ft3/acre or for a 2-year,
24-hour storm event for each disturbed
acre. For a drainage location that serves
10 or more acres disturbed at one time
and where a temporary sediment basin or
equivalent controls is not attainable,
smaller sediment basins and/or sediment
traps should be used.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The EPA 2007 literature
notes to see design specifications from the
Department of Conservation and Natural
Resources (DCNR) and 1994 BMP manual.
None (EPA 2007).
14 days (EPA 2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
New
Hampshire
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature references the
CGP which specifies 3,600 ft3/acre or 2-
year, 24-hour runoff event.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The EPA 2007 literature
notes that EPA's CGP applies, and to see the
design specifications from the 1992 Erosion
and Sediment Control Handbook.
PG estimated no numeric standard.
The standard referenced is not
relevant to stormwater, only for
excavation dewatering. The EPA
2007 literature states, must treat any
uncontaminated excavation
dewatering discharges to remove
TSS and turbidity. TSS must meet
monthly average and maximum daily
TSS limitations of 50 mg/L and 100
mg/L, respectively.
14 days (EPA 2007).
New Jersey
1,800 (2004 TDD
Section 7)
The 2004 TDD Section 7 states that for a
state program that did not note a
sediment basin size, EPA assumed based
on BPJ that the baseline size was 1,800
ft3/acre.
New Jersey Erosion and Sediment Control
and Stormwater Management Requirements
state that Sediment Control Tanks shall be
sized accordingly: 1 ft3 of storage for each
gallon per minute of pump discharge capacity.
Tanks may be connected in series to increase
effectiveness (EPA 2007).
None, standards are for post-
construction (EPA 2007).
Not specified (EPA
2007). 2002 TDD
Appendix A confirmed
no stabilization within 14
days.
New Mexico
3,600 (EPA 2007;
2004 TDD Section
7)
EPA Region 6 issues permit—the 2003
general permit states that for 10 or more
disturbed acres at one time, a temporary
(or permanent) sediment basin providing
at least 3,600 ft3/acre drained shall be
provided until final stabilization of the site.
For drainage locations which serve 10 or
more disturbed acres at one time and
where a temporary sediment basin or
equivalent controls is not attainable,
smaller sediment basins and/or sediment
traps should be used. For drainage
locations serving less than 10 acres,
smaller sediment basins and/or sediment
traps should be used. At a minimum, silt
fences, vegetative buffer strips, or
equivalent sediment controls are required
for all down slope boundaries (and for
those side slope boundaries deemed
appropriate as dictated by individual site
conditions) of the construction area unless
a sediment basin providing storage for a
calculated volume of runoff from a 2-year,
24-hour storm or 3,600 ft3 of storage per
acre drained is provided.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The EPA 2007 literature
notes that EPA Region 6 issues permit.
None (EPA 2007).
14 days (EPA 2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
New York
3,600 (2004 TDD
Section 7). For
alternate size
standards, see New
York's Standards
and Specifications
for Erosion and
Sediment Control
(August 2005).
The New York August 2005 Standards
and Specification for Sediment and
Erosion Control states that the minimum
sediment storage volume of the basin, as
measured from the bottom of the basin to
the elevation of the crest of the principal
spillway shall be at least 3,600 ft3/acre
draining to the basin. This 3,600 ft3 is
equivalent to one inch of sediment per
acre of drainage area. The entire drainage
area is used for this computation, rather
than the disturbed area above, to
maximize trapping efficiency. The length
to width ratio shall be greater than 2:1,
where length is the distance between the
inlet and outlet. A wedge shape shall be
used with the inlet at the narrow end.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The EPA 2007 literature
notes to see details in New York's Standards
and Specifications for Erosion and Sediment
Control (August 2005).
None (EPA 2007).
7 days (Permit No. GP-
0-08-001)
North Carolina
1,800 (EPA 2007;
2004 TDD Section
7)
The 2006 Erosion and Sediment Control
Planning and Design Manual states that
the sediment storage volume of the basin,
as measured to the elevation of the crest
of the principal spillway, is at least 1,800
ft3/acre for the disturbed area draining into
the basin (1,800 ft3 is equivalent to a 112
inch of sediment per acre of basin
drainage area) for a maximum of 100
acres. See more details on basin design
provided in manual (EPA 2007).
The EPA 2007 literature notes a sediment
basin storage volume of 1,800 ft3/acre
drained.
None. None listed in EPA 2007 or
2002 TDD Appendix A.
None specified. 2002
TDD Appendix A
confirms no stabilization
within 14 days. 20 acres
of total disturbance at
any given time for areas
discharging to high
quality waters (2002
TDD Appendix A).
North Dakota
3,600 (EPA 2007)
The 2004 permit states that (for 10 or
more acres) the basins shall be sized to
provide 3,600 ft3 of storage below the
outlet pipe per acre drained to the basin.
Alterative designs may be used which
provide storage below the outlet for a
calculated volume of runoff from a 2-year,
24-hour storm and provides not less than
1,800 ft3 of storage below the outlet pipe
from each acre drained to the basin. (EPA
2007).
The 2004 TDD Section 7 notes a sediment
basin storage volume of 1,800 ft3/acre
drained.
None (EPA 2007).
Not specified (EPA
2007). 2002 TDD
Appendix A confirmed
no stabilization within 14
days.
Ohio
1,800 (EPA 2007;
2004 TDD Section
7)
N/A
The 2006 Rainwater and Land Development
Manual states that for areas less than 100
acres, the volume of the dewatering zone
shall be a minimum of 1,800 ft3/acre of
drainage (66.7 yd3/acre) (EPA 2007).
None (EPA 2007).
7 days, or 2 days if near
stream (EPA 2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Oklahoma
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes that the
2002 general permit states that for 10 or
more acres drained the basin shall
provide storage for a 2-year, 24-hour
storm event or 3,600 ft3 of storage per
acre. The 2002 TDD Appendix A notes
3,600 ft3/acre.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007).
14 days (EPA 2007).
Oregon
3,600 (EPA 2007)
N/A
Per the Oregon Erosion and Sediment
Control Manual (April 2005), basin size shall
be 3,600 ft3/acre and be designed by a
professional engineer. The 2004 TDD Section
7 notes a sediment basin storage volume of
1,800 ft3/acre drained.
If discharging to a 303(d) listed
waterbody or a waterbody with a
TMDL for sediment and turbidity,
sampling for turbidity is required to
meet a 160 NTU benchmark. If
unable to meet benchmark, an Action
Plan using a BMP such as water
treatment using electro-coagulation,
chemical flocculation or filtration shall
be implemented. (OR CGP)
1 day (PG assumed).
The EPA 2007 literature
notes apply temporary
or permanent soil
stabilization measures
immediately on all
disturbed areas as
grading progresses.
Pennsylvania
5,000 (EPA 2007)
The EPA 2007 literature notes that the
2005 permit states that (1) A sediment
storage zone of 1,000 ft per disturbed
acre within the watershed of the basin is
required; (2) A dewatering zone of 5,000
ft3 for each acre tributary to the basin is to
be provided. Reductions in the dewatering
zone are allowed unless the basins is in a
HQ or EV watershed, however the
minimum required dewatering zone is at
least 3,600 ft3/acre. (3,600 to 6,000
ft3/acre + 1,800 ft3/acre = 4,800 to 6,000
ft3/acre, assumed 5,000 ft3/acre). The
2002 TDD Appendix A notes a 5-year
runoff event for water quality treatment.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres. The 2002 TDD Appendix A
states that basins volumes should drain no
quicker than 4 days and no longer than 7
days.
None (EPA 2007).
Not specified (EPA
2007). 2002 TDD
Appendix A confirmed
no stabilization within 14
days.
Rhode Island
1,800 (2004 TDD
Section 7)
The 2004 TDD Section 7 states that for a
state program that did not note a
sediment basin size, EPA assumed based
on BPJ that the baseline size was 1,800
ft3/acre. The EPA 2007 literature notes no
sizing criteria in permit. The 2002 TDD
Appendix A notes a 10-year runoff event
for water quality treatment.
The Stormwater Design and Installation
Standards Manual and the Soil Erosion and
Sediment Control Handbook were not
reviewed.
PG estimated no numeric standard.
None (EPA 2007). The 2002 TDD
Appendix A notes 80 to 90 percent
TSS reduction; however, PG could
not confirm for active construction
runoff.
14 days (EPA 2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
South Carolina
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes basin
sizing requirements for 10 or more acres
provide storage for a 10-year, 24-hour
storm event or at least 3,600 ft3/acre. (10-
year, 24-hour Soil Conservation Service
(SCS) Type II, or Type III (coastal zone)
storm event). The 2002 TDD Appendix A
notes 3,600 ft3/acre.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
PG estimated no numeric standard.
The EPA 2007 literature notes 80
percent of TSS removal for drainage
areas > 5 acres. The 2002 TDD
Appendix A notes 80 percent TSS
reduction; however, PG could not
confirm for active construction runoff.
14 days. As soon as
possible (ASAP), but no
later than 14 days (EPA
2007).
South Dakota
3,600 (EPA 2007;
2004 TDD Section
7)
The 2002 TDD Appendix A notes a 5-year
runoff event for water quality treatment.
(PG could not find reference for this).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007).
14 days (EPA 2007).
Tennessee
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes that the
2005 permit states to design for a 2-year,
24-hour storm for 10 or more acres. Also,
the 2002 Erosion and Sediment Control
Handbook states that the total storage
volume of the basin at the spillway should
be at least 134 cubic yards (3,618 ft3) per
acre of drainage area. The volume of the
permanent pool must be at least 67 cubic
yards (1,809 ft3) per acre of drainage area
and the volume of dry storage must be at
least an additional 67 cubic yards (1,809
ft3) per acre of drainage area. The
emergency spillway should be able to
handle a 2-year or 5-year, 24-hour storm
event. The outlets for the basin should
pass the peak runoff expected from the
contributing drainage area for a 25-year,
24-hour storm.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007).
15 days, Pre-
construction vegetative
ground cover shall not
be destroyed, removed
or disturbed more than
10 days before grading
or earth moving unless
the area is seeded
and/or mulched or other
temporary cover is
installed. Construction
must be phased for
projects in which over
50 acres of soil will be
disturbed. No more than
50 acres of active soil
disturbance is allowed
at any time during the
construction project
(EPA 2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Texas
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes that the
2003 Permit states that sediment basins
are required where feasible for common
drainage locations that serve an area with
10 or more acres disturbed at one time.
The temporary (or permanent) sediment
basin should provide storage for a
calculated volume of runoff from a 2-year,
24-hour storm from each disturbed acre
drained. Where rainfall data is not
available or a calculation cannot be
performed, a sediment basin providing
3,600 ft3 of storage per acre drained is
required where attainable until final
stabilization of the site. The 2002 TDD
Appendix A notes 3,600 ft3/acre.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None, except for concrete batch
plants (EPA 2007)
14 days (EPA 2007)
Utah
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes that the
2002 permit says for 10 or more acres
basin storage shall provide for a 10-year,
24-hour storm event, or 3,600 ft3/acre.
Permit No.: UTRI00000 (10/31/200) states
"...sediment basin that provides storage
for a 10-year, 24-hour storm event, a
calculated volume of runoff for disturbed
acres drained, or equivalent control
measures, until final stabilization of the
site. Where calculations are not
performed, a sediment basin providing
3,600 ft3 of storage per acre drained (a 1
inch storm event)"
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007).
14 days (EPA 2007).
Vermont
1,800 (2004 TDD
Section 7)
The EPA 2007 literature notes basin
sizing of 3,600 ft3/acre for moderate risk
only, and no sizing criteria in permit. The
2004 TDD Section 7 states that for a state
program that did not note a sediment
basin size, EPA assumed based on BPJ
that the baseline size was 1,800 ft3/acre.
EPA 2007 literature found no sizing criteria
and found 3,600 ft3/acre for moderate risk
only; therefore, assumed 1,800 per BPJ from
2004 TDD Section 7.
Vermont's CGP issued February,
2008 contains a numeric action level
of 25 NTU for moderate-risk sites.
21 days, for low or
moderate risk activities
only (EPA 2007).
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
a>
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Virginia
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes that the
Virginia Erosion and Sediment Control
regulations state that sediment traps and
sediment basins shall be designed and
constructed based on the total drainage
area to be served by the trap or basin.
Surface runoff from disturbed areas that is
comprised of flow from drainage areas
greater than or equal to three acres shall
be controlled by a sediment basin. The
minimum storage capacity of a sediment
basin shall be 134 cubic yards per acre
(3,618 ft3) of drainage area. The outfall
system shall, at a minimum, maintain the
structural integrity of the basin during a
25-year, 24-hour duration storm event.
Runoff coefficients used in runoff
calculations shall correspond to a bare
earth condition or those conditions
expected to exist while the sediment basin
is used. The 2002 TDD Appendix A notes
that sediment basins required for sites of
10 acres or more (except those with final
stabilization); for sites less than 10 acres,
same units required but only for sideslope
and downslope boundaries of construction
sites.
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007)
7 days (EPA 2007)
Washington
3,600 (eastern WA
only). For alternate
size standards, see
WA BMP C241.
The 2002 TDD Appendix A notes a 24-
hour/6-month storm for water quality
treatment. 2-year (or 10-year peak if
warranted) OR Rational Method See
Eastern Washington BMP C241
(http://www.ecy.wa.gov/pubs/0410076/7.p
df). Western Washington has the same
storm events but does not specifically
mention 3,600 ft3/acre.
The EPA 2007 literature notes basin
requirements are different for western and
eastern parts of State—see manuals. The
2004 TDD Section 7 notes a sediment basin
storage volume of 1,800 ft3/acre drained.
Statewide standard varies with
background. PG noted that the WAC
173-201A-030 has been replaced with
the WAC 173-201A-200 Freshwater
designated uses and criteria (updated
2006). Table 200 (1) (e) contains
updated aquatic life turbidity criteria.
The EPA 2007 literature states that
the Water Quality Standards for
Surface Waters of the State of
Washington WAC 173-201 A-030 (1)
(vi) states that turbidity shall not
exceed 5 NTU over background
turbidity when the background
turbidity is 50 NTU or less, or has
more than a 10 percent increase in
turbidity when the background
turbidity is more than 50 NTU.
Both the EPA literature
and the 2002 TDD
Appendix A note that
stabilization varies by
time of year and location
in State. West of the
Cascade Mountains
Crest: During the dry
season (May 1-Sept.
30): 7 days; during the
wet season (October 1-
April 30): 2 days.
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
-vl
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Washington,
Small Parcel

The 2002 TDD Appendix A notes a 24-
hour/6-month storm for water quality
treatment.



West Virginia
3,600 (EPA 2007;
2004 TDD Section
7)
The EPA 2007 literature notes that the
2002 permit states sediment basins and
traps will be installed with 3,600 ft3 of
storage, measured from the bottom
elevation of the structure to the top of the
riser or weir, per acre of drainage and will
have draw down times of 48 to 72 hours.
The 2002 TDD Appendix A notes runoff
from a 2-year storm required for water
quality treatment (PG could not confirm
with state literature).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007).
7 days (EPA 2007).
Wsconsin
1,800 (2004 TDD
Section 7). For
alternate size
standards, see Wl
DNR Conservation
Practice Standard
1064.
The EPA 2007 literature notes in the
Technical Standards document that
basins shall be used for greater than 5 to
100 acres. The sizing criteria for
determining treatment surface area of a
sediment basin are based on the soil
texture and peak outflow during the 1-
year, 24-hour design storm. The overflow
spillway should be designed to carry the
peak rate of runoff expected from a 10-
year, 24-hour design storm. The 2004
TDD Section 7 states that for a state
program that did not note a sediment
basin size, EPA assumed based on BPJ
that the baseline size was 1,800 ft3/acre.

The EPA 2007 literature notes that
the current standard in Wisconsin
(NR 151.11 pg 409) requires
construction sites to implement
erosion and sediment controls to
reduce to the maximum extent
practicable 80 percent of the
sediment load carried in runoff on an
annual basis, compared to a
baseline of no sediment or erosion
controls.
Not specified (EPA
2007). 2002 TDD
Appendix A confirmed
no stabilization within 14
days.
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
State requirements—SUMMARY
State
Sediment basin
storage volume
(ft3/acre drained)
Sediment basin (design parameters)
Sediment basin—notes/references
Numeric standard
Soil stabilization
Wyoming
1,800 (2004 TDD
Section 7)
The EPA 2007 literature notes No sizing
criteria in the permit, and the 1999 Urban
Best Management Practice (BMP) manual
says use basins for 5 to 100 acres. The
2004 TDD Section 7 states that for a state
program that did not note a sediment
basin size, EPA assumed based on BPJ
that the baseline size was 1,800 ft3/acre.
1,800 ft3/acre based on 2004 TDD Section 7.
Standard varies with background.
The EPA 2007 literature notes that
for cold water fisheries and drinking
water supplies turbidity level
increases must be less than 10
NTUs; for warm water /nongame
fisheries turbidity level increases
must be less than 15 NTUs.
However, an exception shall apply to
the North Platte River from Guernsey
Dam to the Nebraska line during the
annual "silt run" from Guernsey Dam.
The 2002 TDD Appendix A notes
turbidity levels must be less than 10
to 15 NTUs.
28 days, temporary
stabilization (such as
cover crop plantings,
mulching or erosion
controls blankets,
surface roughening,
etc.) for exposed soil
areas where activities
have permanently or
temporarily ceased
should be installed
whenever practicable in
areas where further
work is not expected for
28 days or more (EPA
2007).
Puerto Rico





District of
Columbia
3,600 (EPA 2007;
2004 TDD Section
7)
Basin sizing for 2-year, 24-hour storm
(EPA 2007).
The 2004 TDD Section 7 notes sediment
basin drainage requirements for drainage
areas > 10 acres.
None (EPA 2007)
14 days (EPA 2007)
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Alabama
Basin sizing of 1,800 ft3/acre.
8-hour detention time for sites greater
than 5 acres.

13
No
There are no standards, but
the manual recommends
that detention basins
provide 1/2 inch of runoff
storage and that discharge
be at the 2-year
predevelopment rate to
minimize downstream
erosion.

Alaska
Basin sizing of 1,800 ft3/acre plus
1.5 ft for sediment accumulation—
generally designed to remove
medium silt (62 microns) particles.
Construction General Permit (CGP)
CGP

No
None

Arizona
Basin sizing of 3,600 ft3/acre or 2-
year, 24-hour.


14
No
None

Arkansas
Basin sizing of 3,600 ft3/acre or 10-
year, 24-hour.


14
80 percent removal of TSS from
flows exceeding predevelopment
levels, where practicable.
None

California
Several standards exist, including a
basin sizing of 3,600 ft3/acre as well
as a settling velocity approach

Not specified

California's draft CGP includes
turbidity effluent levels of 1,000
NTU. If Active Treatment Systems
are used, the daily flow-weighted
average is 10 NTU and the
maximum for any sinqle sample is
20 NTU.
85 percent of storm events
from specific development
categories must be
infiltrated or treated per the
Standard Urban Stormwater
Mitigation Plan (SUSMP).

Colorado
Colorado Department of
Transportation (CDOT) specifies
3,600 ft3/acre sediment basin sizing.
Colorado requires preparation of a
stormwater pollution prevention plan
(SWPPP) but does not specify specific
sizing for BMPs. No statewide erosion
and sediment control manual exists.
Extensive requirements exist at the local
level. Specifically, Douglas County
requires that disturbed areas be drill
seeded, crimped and mulched, or
permanently landscaped within 30 days
from the start of land disturbance
activities or within 7 days of the
substantial completion of grading and
topsoiling operations, whichever duration
is shorter.
Douglas County requires that
disturbed areas be drill seeded
and crimp mulched, or
permanently landscaped, within
30 days from the start of land
disturbance activities or within 7
days of the substantial
completion of grading and
topsoiling operations, whichever
duration is shorter.
see notes
No
None

>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
o
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Connecticut
Basin sizing of 3,600 ft3/acre.
Required for sites greater than 2 acres.
Where construction activities
have permanently ceased or
have temporarily been
suspended for more than 7 days,
or when final grades are reached
in any portion of the site,
stabilization practices shall be
implemented within three days.
Areas that will remain disturbed
but inactive for at least 30 days
shall receive temporary seeding.
Areas that will remain disturbed
beyond the planting season, shall
receive long-term, nonvegetative
stabilization sufficient to protect
the site through the winter.
3
80% TSS [A goal of 80 percent
removal of TSS - 2004
Connecticut Stormwater Quality
Manual, Chapter 6.]
[Requires treatment of] 1
inch, which equals 90
percent of average annual
runoff.

Delaware
Basin sizing of 3,600 ft3/acre.


14
No
[Recommended treatment
volume for] 2 inches of
rainfall, up to 1 inch of
runoff. Goal is to remove 80
percent of the annual TSS
load, classified as a post
construction standard.

Florida
Basin sizing of 3,600 ft3/acre.


7
No
Requirements vary by
region. Generally, it appears
that 0.5 inch to 1 inch of
runoff is a recommended
treatment volume.

Florida, DEP,
Northern District
(only applies in
NW Florida)







Florida, South
Florida Water
Management
District (General,
Standard General,
Noticed General
and Individual
Permits)







>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
ro
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Florida,
Southwest Florida
Water
Management
District







Florida, St. Johns
River Water
Management
District







Florida,
Suwannee River
Water
Management
District







Georgia
Basin sizing of 1,800 ft3/acre.


14
Receiving water turbidity
standard—cannot increase
turbidity by more than 25 NTU in
warm waters and 10 NTU in cold
water trout streams. Allowable
turbidity in effluent varies based
on site size and receiving stream
drainage area.
Requires treatment of 85
percent of annual runoff,
which equates to 1.2-inch
storm event depth.
New development
standards apply to
sites that create
5,000 square feet of
impervious area or
disturb 5,00 or more
square feet
Hawaii
Basin sizing of 3,600 ft3/acre or 2-
year, 24-hour for drainage areas >
10 or more acres.


30

Reduce the average annual
TSS loadings by 80 percent
based on the average
annual TSS loadings from
all storms less than or equal
to the 2-year, 24-hour
storm. Reduce the post-
development loadings of
TSS so that the average
annual TSS loadings are no
greater than
predevelopment loadings.
To the extent practicable,
maintain post-development
peak runoff rate and
average volume at levels
that are similar to
predevelopment levels. For
design purposes, post-
development peak runoff
rate and average volume
should be based on the 2-
year/24-hour storm.
The Hawaii
Department of
Health's Clean Water
Branch (CWB) is
responsible for
administrating the
state's stormwater
management plan.
No numeric
requirements for
stormwater pollutant
removal have been
established at the
state level, but
regional and
municipal regulations
are in place. For
example, the city and
county of Honolulu
has developed a
stormwater
management plan
and BMP manual for
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
ro
ro
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes







controlling
stormwater within the
limits of the city and
the county. The
counties of Hawaii,
Maui, Kauai, and the
city and county of
Honolulu are
responsible for
planning and zoning
in urban districts.
They have additional
responsibilities that
include state-
mandated county
regulatory programs
dealing with erosion
control, urban
design, and other
areas. The Hawaii
Coastal Nonpoint
Pollution Program
Management Plan,
Part III and Hawaii's
Implementation Plan
for Polluted Runoff
Control contain
descriptions of
management
measures for urban
areas to address
runoff. These are the
requirements
described in this
summary.
Idaho
Basin sizing of 3,600 ft3/acre or 2-
year, 24-hour for drainage areas >
10 or more acres.


14


EPA issues permits
in Idaho because the
state has not been
delegated authority
to issue NPDES
construction permits.
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
co
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Illinois
No sizing criteria in permit.
The 2002 Illinois Urban Manual states
that the basin requirements shall be
based on a 2-year, 24-hour storm or 134
cubic yards/acre (i.e., 3,600 ft3/acre)—
whichever is greater.
Stabilization within 14 days
(unless covered with snow or
construction will resume within 21
days).
14
No


Indiana
No sizing criteria in permit.
Exist for some areas in the state.

15
Not applicable. Only in certain
parts of Indiana (e.g., 80 percent
of TSS removal in Marion County)
(EPA 2007).


Iowa
Basin sizing of 3,600 ft3/acre. The
2002 permit states that a sediment
basin shall be installed for drainage
area more than 10 acres disturbed.
(Flows from upland areas that are
undisturbed may be diverted around
the basin).
The 2006 Iowa Construction Site Erosion
Control Manual states that the size of the
sediment basin, is as measured from the
bottom of the basin to the principal
spillway and should provide at least 3,600
ft3 of storage per acre of drainage. This
provides storage equal to 1 inch of runoff
per acre. Likewise, 1,800 ft3 amounts to
1/2 inch of sediment storage per acre.
The basin should be cleaned when the
volume of sediment reaches 900 ft3/acre.
At this time, the cleanout shall be
performed to restore the original design
capacity of the basin. At no time should
the sediment level be permitted to build
higher than 1 ft below the principal outlet.
Stabilization within 14 days
(unless covered with snow or
construction will resume within 21
days).
14
No


Kansas
The 2007 permit requires a storage
capacity of 3,600 ft3/acre and the
Sediment Basin Design Criteria in
the permit states, "rational method
or other equivalent runoff
calculations based on storage of a
2.6-inch rainfall event with a
minimum runoff coefficient of 0.77
for disturbed acreage and
appropriate runoff coefficients for
undisturbed acreage must be
provided to determine the revised
storage volume requirement."
The field guide for Missouri and Kansas
says that for drainage areas of 20 acres
or less, the sediment storage shall be
1,800 ft3/acre with a detention time of at
least 24 hours.
None specified; state that "time
should be minimized."
N/A
No


Kentucky
The 2002 permit requires a basin
sizing of 3,600 ft3/acre for drainage
locations >10 acres.
The 2007 Draft Kentucky BMP Manual
requires basin sizing of 3,600 ft3/acre, not
to exceed 10 acre-feet for areas 5 to 120
acres. The goal is to reduce TSS by 80
percent for the 10-year, 24-hour storm, or
provide a detention time of 24 to 48 hours
for the 10-year, 24-hour storm.
Stabilization within 14 days
(unless covered with snow or
construction will resume within 21
days).
14
80% TSS (EPA 2007). A goal of
80 percent removal of TSS from
flows that exceed predevelopment
levels (2002 General KPDES
Permit for Stormwater Point
Source Discharges, Construction
Activity, page IV-2)


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Louisiana
For 10 or more disturbed acres either
the smaller of 3,600 ft3/acre or a 2-
year, 24-hour storm. This does not
apply to flows from off-site areas and
flows from on-site areas that are
either undisturbed of have undergone
final stabilization where such flows
are diverted around the sediment
basin. For drainage locations serving
less than 10 acres, smaller sediment
basins and/or sediment traps should
be used. At a minimum, silt fences,
vegetative buffer strips, or equivalent
sediment controls are required for all
downslope boundaries of the
construction area unless a sediment
basin providing storage for a
calculated volume of runoff from a 2-
year, 24-hour storm or 3,600 ft3 of
storage per acre drained is provided.


14
There are standards for permitted
support activities related to a
construction site (cement and
concrete facilities, hot mix
asphalt/asphaltic concrete
facilities, stockpiles of sand and
gravel, and non-process area
stormwater from cement,
concrete, and asphalt facilities).
They establish monthly monitoring
requirements and discharge
limitations for flow (parameters:
TSS, TOC, Oil & Grease, and
allowable ranges of pH).


Maine
No sizing criteria in permit.
The 2003 Erosion and Sediment Control
BMPs Manual states that the capacity of
the sediment basin shall be equal to the
stormwater volume to be detained plus
the volume of sediment expected to be
trapped. Periodic removal of sediment will
be necessary to maintain basin's
capacity. Temporary basins having
drainage areas of 5 acres or less and a
total embankment height of 5 feet or less
may be designed with less conservative
criteria. Any excavated pond with a
drainage area in excess of 5 acres, or
spring flow in excess of 100 gallons per
minute must be designed in accordance
with embankment pond criteria.
Excavated ponds must be designed to be
drained within a 10-day period.
Operators must stabilize with
mulch, or other non-erodible
cover, any exposed soils that will
not be worked for more than 7
days. They must stabilize areas
within 75 feet of a wetland or
waterbody within 48 hours of the
initial disturbance of the soil or
before any storm event,
whichever comes first. They are
also required to remove any
temporary control measures,
such as silt fences, within 30
days after permanent stabilization
is attained.
14
No


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
cn
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Maryland

The 1994 Erosion and Sediment Control
requirements states that the minimum
storage volume for sediment basins is
3,600 ft3/acre of contributing drainage
area, equally divided between wet
storage and dry storage. The specified
drawdown time from the crest of the basin
to the permanent pool level is 10 hours
(minimum). The state standards do not
specify minimum site sizes where
sediment basins are required, but it is
assumed based on the sediment trap
applicability criteria that sediment basins
are required for contributing drainage
areas of 10 or more acres.
Stabilization is 14 days (7 days
for steep slopes).
14
No


Massachusetts
EPA issues permit.
The 2003 Erosion and Sediment Control
guidelines says the drainage area for the
sediment basin should be no more than
100 acres with a life span of 3 years
unless it is designed as a permanent
structure. The sediment basin should
have a minimum volume based on 1/2
inch of storage for each acre of drainage
area. This volume equates to 1,800 ft3 of
storage or 67 cubic yards for each acre of
drainage area. The sediment basin
should have a total spill way capacity for
a 10-year peak flow with a 1 -foot
freeboard. Freeboard is the difference
between the design flow elevation in the
emergency spillway and the top elevation
of the embankment.
CGP reference.
14
No


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
ro
a>
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Michigan

1998 Guidebook for Best Management
Practices for Michigan Watersheds
provides sediment basin design
recommendations (see longer write-up for
details). The 1998 Guidebook for Best
Management Practices for Michigan
Watersheds provides sediment basin
design recommendations. A
straightforward method requires a storage
volume that is equal to one-half inch of
runoff from the contributing watershed. (For
residential areas, 1/2 inch of runoff would
be about a 1-year rainfall event in
Michigan). For the high percentage of
particulate pollutant removal, the detention
basin should be designed so that it will take
at least 24 hours to drain the entire volume
stored. (For more information, see chapter
3 of the guidebook.)
Stabilization within 15 calendar
days after final grading or the
final earth change has been
completed.
15
No


Minnesota
For 10 or more disturbed acres; (1)
The basins must provide storage
below the outlet pipe for a
calculated volume of runoff from a 2-
year, 24-hour storm from each acre
drained to the basin, except that in
no case shall the basin provide less
than 1,800 ft3 of storage below the
outlet pipe from each acre drained
to the basin, (2) Where no such
calculation has been performed, a
temporary (or permanent) sediment
basin providing 3,600 ft3 of storage
below the outlet pipe per acre
drained to the basin shall be
provided where attainable until final
stabilization of the site.

Steeper than 3:1, 7 days, 10:1 to
3:1,14 days, flatter than 10:1, 21
days
7,14 or
21 (see
notes)
No - Where an alternative,
innovative treatment system is
proposed and demonstrated by
calculation, design or other
independent methods to achieve
80 percent TSS removal a 2-year
monitoring plan to sample runoff
from the proposed method must
be submitted.


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
-vi
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Mississippi
The 2005 general permit states that
for 10 or more acres disturbed at
one time, a temporary (or
permanent) sediment basin
providing at least 3,600 ft3/acre
drained shall be provided until final
stabilization of the site.
The Planning and Design Manual states
that the maximum allowable drainage
area into the basin shall be 25 acres. The
design capacity of the basin must be at
least 67 yd3/acre (1809 ft3/acre). The
capacity of the basin may be estimated by
40% x Height x Surface Area. The basin
spillway shall be designed to handle peak
flow from a 10-year, 24-hour storm event.
If a principal spillway is used in
conjunction with an emergency spillway,
the principal spillway shall have a
minimum capacity of 0.2 cfs per acre of
drainage area when the water surface is
at the crest of the emergency spillway.
The embankment of the sediment basin
shall be temporarily seeded within 15
days after its completion. The basin
should be designed according the
following data sheet (see more detailed
summaries in the manual).
Within 7 calendar days when a
disturbed area will be left
undisturbed for 30 days or more.
7
No

Different general
permits exist for
large and small (1 to
< 5 acres).
Missouri
The 2007 permit states that basins
are needed for 10 acres or more,
with a basin sizing at least 3,600
ft3/acre. In valuable water resource
areas the sediment basin needs to
contain 1/2 inch of sediment from
the drainage and withstand the 2-
year, 24-hour storm. The basin
spillway or embankment requires
stabilization to minimize potential for
erosion.
The 1995 Erosion and Sediment Manual
says the contributing area is
recommended to be 20 acres or less and
sized to store a minimum of 1,800 ft3 per
disturbed acre with a detention of at least
24 hours. The site should be vegetated
and stabilized immediately after
construction.
Stabilization at 14 days; however
if the slope of the area is greater
than 3:1 (3 feet horizontal to 1
foot vertical) or if the slope is
greater than 3 percent and
greater than 150 feet in length,
then interim stabilization within 7
days of ceasing operations on
that part of the site is required.
7 or 14
(see
notes)
Per the Missouri State Operating
Permit General Permit MO-
RI 09000 3/8/2002: Construction
site discharges shall not violate
Missouri Code of State
Regulations General Water
Quality Standards 10 CSR 20
7.031(3) or exceed a maximum
settleable solids concentration of
2.5 ml/L per hour for each
stormwater outfall. If the disturbed
area is near a Valuable
Resources Water, settleable
solids may not exceed 0.5 ml/L
per hour.


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
00
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Montana
No sizing criteria in permit.
The Erosion and Sediment Control
Manual states that desilting basins are
appropriate for areas of disturbed soil
between 5 acres and 10 acres in size.
Desilting basins shall be designed to have
a capacity equivalent to 100 m3 (1500 ft3)
of storage (as measured from the top of
the basin to the principal outlet,) per
hectare (acre) of contributory area. This
design is less than that required to
capture 0.01 mm (0.0004 in) particle size,
but larger than that required to capture
particles 0.02 mm (0.0008 in) or larger.
The depth must be no less than 1 m (3 ft)
nor greater than 1.5 m (5 ft). Basins shall
be designed to drain within 72 hours
following storm events.

N/A
BMPs must minimize or prevent
significant sediment (as defined in
Part VI of the General Permit p.
28) from leaving the construction
site. Significant sediment means
sediment, solids, or other wastes
discharged from construction site,
or a facility or activity regulated
under the General Permit that
exceeds 1.0 cubic foot in volume
in any area of 100 square feet
that may enter state surface water
or a drainage that leads directly to
state surface water.


Nebraska
Sediment basins required for 5
acres or more in size. Where slopes
are equal to or steeper than 3:1,
sediment basins may be required for
smaller drainage areas.
None
Temporary or permanent seeding
shall be established as soon as
possible after grading and
clearing activities are completed,
and during interim periods on
areas that are not being actively
worked. Whenever exposed soils
are not to be graded for 30 days
or more, temporary or permanent
seeding needs to be initiated,
unless other stabilization
methods are used or such need
can be justified as unnecessary
because of mitigating conditions
present at the site.
30 (see
notes)
No


Nevada
The 2002 permit states that basin
requirements for drainage areas >
10 acres shall provided storage of
3,600 ft3/acre or for a 2-year, 24-
hour storm event for each disturbed
acre. For a drainage location which
serves ten or more acres disturbed
at one time and where a temporary
sediment basin or equivalent
controls is not attainable, smaller
sediment basins and/or sediment
traps should be used.
See design specifications from the
Department of Conservation and Natural
Resources (DCNR) and 1994 BMP
manual.

14
No


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
ro
CD
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
New Hampshire
EPA's CGP applies.
See the design specifications from the
1992 Erosion and Sediment Control
Handbook.

14
Yes, see monitoring. Must treat
any uncontaminated excavation
dewatering discharges to remove
TSS and turbidity. Must sample at
a location before mixing with
stormwater at least once per
week during weeks when
discharges occur. TSS must meet
monthly average and maximum
daily TSS limitations of 50 mg/L
and 100 mg/L, respectively.
Records of any sampling and
analysis must be maintained and
kept with the SWPPP for at least
3 years after final site
stabilization. Applicable only to
certain size sites.


New Jersey

New Jersey Erosion and Sediment
Control and Stormwater Management
Requirements state that Sediment Control
Tanks shall be sized accordingly: 1 cubic
foot of storage for each gallon per minute
of pump discharge capacity. Tanks may
be connected in series to increase
effectiveness.
None
N/A
A major development project that
creates at least 0.25 acres of new
or additional impervious surface
must include stormwater
management measures that
reduce the average annual TSS
load in the development site's
post-construction runoff by 80
percent. In addition, these
stormwater management
measures must reduce the
average annual nutrient load in
the post-construction runoff by the
maximum extent feasible. For
various BMPs for more detailed
TSS and nutrient removal rates,
see Chapter 4 of the New Jersey
Stormwater Best Management
Practices Manual.


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
o
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
New Mexico
EPA Region 6 issues permit—the
2003 general permit states that for
10 or more disturbed acres at one
time, a temporary (or permanent)
sediment basin providing at least
3,600 ft3/acre drained shall be
provided until final stabilization of
the site. For drainage locations
which serve 10 or more disturbed
acres at one time and where a
temporary sediment basin or
equivalent controls is not attainable,
smaller sediment basins and/or
sediment traps should be used. For
drainage locations serving less than
10 acres, smaller sediment basins
and/or sediment traps should be
used. At a minimum, silt fences,
vegetative buffer strips, or
equivalent sediment controls are
required for all down slope
boundaries (and for those side slope
boundaries deemed appropriate as
dictated by individual site conditions)
of the construction area unless a
sediment basin providing storage for
a calculated volume of runoff from a
2-year, 24-hour storm or 3,600 ft3 of
storage per acre drained is
provided.


14
No


New York

See details in New York's Standards and
Specifications for Erosion and Sediment
Control (August 2005).

14
No


North Carolina

The 2006 Erosion and Sediment Control
Planning and Design Manual states that
the sediment storage volume of the basin,
as measured to the elevation of the crest
of the principal spillway, is at least 1,800
ft3/acre for the disturbed area draining into
the basin (1,800 ft3 is equivalent to a 1/2
inch of sediment per acre of basin
drainage area) for a maximum of 100
acres. See more details on basin design
provided in manual.

N/A



>
"O
"O
0
3
Q_
X
>
CD
C
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
North Dakota
The 2004 permit states that (for 10
or more acres) the basins shall be
sized to provide 3,600 ft3 of storage
below the outlet pipe per acre
drained to the basin. Alterative
designs may be used which provide
storage below the outlet for a
calculated volume of runoff from a 2-
year, 24-hour storm and provides
not less than 1,800 ft3 of storage
below the outlet pipe from each acre
drained to the basin.

None
N/A
No


Ohio
The 2003 permit states that a
sediment settling pond shall be
sized to provide at least 67 cubic
yards of storage per acre or 1809
ft3/acre.
The 2006 Rainwater and Land
Development Manual states that for areas
less than 100 acres, the volume of the
dewatering zone shall be a minimum of
1,800 ft3/acre of drainage (66.7 yd3/acre).
Stabilization in 7 days, or 2 days
if near stream.
2 or 7
(see
notes)
No


Oklahoma
The 2002 general permit states that
for 10 or more acres drained the
basin shall provide storage for a 2-
year, 24-hour storm event or 3,600
ft3 of storage per acre.


14
No


Oregon

Basin sizing of 3,600 ft3/acre.
Apply temporary or permanent
soil stabilization measures
immediately on all disturbed
areas as grading progresses.
1 (see
notes)
No

Additional
requirements for
special waters.
Pennsylvania
The 2005 permit states that (1) A
sediment storage zone of 1,000 ft3
per disturbed acre within the
watershed of the basin is required;
(2) A dewatering zone of 5,000 ft3
for each acre tributary to the basin is
to be provided. Reductions in the
dewatering zone are allowed unless
the basins is in a HQ or EV
watershed, however the minimum
required dewatering zone is at least
3,600 ft3/acre.

None
N/A
No


Rhode Island
No sizing criteria in permit.
The Stormwater Design and Installation
Standards Manual and the Soil Erosion
and Sediment Control Handbook were not
reviewed.

14
No


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
CO
ro
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
South Carolina
Basin sizing requirements for 10 or
more acres provide storage for a 10-
year, 24-hour storm event or at least
3,600 ft3/acre (10-year 24-hour Soil
Conservation Service (SCS) Type II,
or Type III (coastal zone) storm
event).

As soon as possible, but no later
than 14 days.
14
80 percent of TSS removal for
drainage areas > 5 acres.


South Dakota
Basin sizing of 3,600 ft3/acre.


14
No


Tennessee
The 2005 permit states to design for
a 2-year, 24-hour storm for 10 or
more acres.
The 2002 Erosion and Sediment Control
Handbook states that the total storage
volume of the basin at the spillway should
be at least 134 cubic yards (3,618 ft3) per
acre of drainage area. The volume of the
permanent pool must be at least 67 cubic
yards (1,809 ft3) per acre of drainage area
and the volume of dry storage must be at
least an additional 67 cubic yards (1,809
ft3) per acre of drainage area. The
emergency spillway should be able to
handle a 2-year or 5-year, 24-hour storm
event. The outlets for the basin should
pass the peak runoff expected from the
contributing drainage area for a 25-year,
24-hour storm.
Preconstruction vegetative
ground cover shall not be
destroyed, removed or disturbed
more than 10 days before
grading or earth moving unless
the area is seeded and/or
mulched or other temporary
cover is installed. Construction
must be phased for projects in
which more than 50 acres of soil
will be disturbed. No more than
50 acres of active soil
disturbance is allowed at any
time during the construction
project.
15
No

There are additional
SWPPP
requirements for
discharges into
impaired or high-
quality waters.
Texas
The 2003 Permit states that
sediment basins are required where
feasible for common drainage
locations that serve an area with 10
or more acres disturbed at one time.
The temporary (or permanent)
sediment basin should provide
storage for a calculated volume of
runoff from a 2-year, 24-hour storm
from each disturbed acre drained.
Where rainfall data is not available
or a calculation cannot be
performed, a sediment basin
providing 3,600 ft3 of storage per
acre drained is required where
attainable until final stabilization of
the site.


14
For Concrete Batch plants only.

Additional
requirements for
different locations in
Texas.
Utah
The 2002 permit says for 10 or more
acres basin storage shall provide for
a 10-year, 24-hour storm event, or
3,600 ft3/acre.


14
No


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
CO
CO
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Vermont
No sizing criteria in permit.
Basin sizing of 3,600 ft3/acre for moderate
risk only.
For low or moderate risk activities
only.
21 (see
notes)
No


Virginia
For common drainage locations that
serve an area with 3 or more acres
disturbed at one time, a temporary
(or permanent) sediment basin
providing 3,618 ft3 of storage per
acre drained, or equivalent control
measures, shall be provided where
attainable until final stabilization of
the site.
The Virginia Erosion and Sediment
Control regulations state that sediment
traps and sediment basins shall be
designed and constructed based on the
total drainage area to be served by the
trap or basin. The minimum storage
capacity of a sediment trap shall be 134
cubic yards per acre of drainage area
(3,618 ft3) and the trap shall only control
drainage areas less than 3 acres. Surface
runoff from disturbed areas that is
composed of flow from drainage areas
greater than or equal to three acres shall
be controlled by a sediment basin. The
minimum storage capacity of a sediment
basin shall be 134 cubic yards per acre of
drainage area. The outfall system shall, at
a minimum, maintain the structural
integrity of the basin during a 25-year, 24-
hour duration storm event. Runoff
coefficients used in runoff calculations
shall correspond to a bare earth condition
or those conditions expected to exist
while the sediment basin is used.

7
No


Washington

Basin requirements are different for
western and eastern parts of state—see
manuals.
Varies by time of year and
location in state. West of the
Cascade Mountains Crest:
During the dry season (May 1-
Sept. 30): 7 days; during the wet
season (October 1-April 30): 2
days.
2 or 7
(see
notes)
The Water Quality Standards for
Surface Waters of the State of
Washington WAC 173-201A-030
(1) (vi) states that turbidity shall
not exceed 5 NTU over
background turbidity when the
background turbidity is 50 NTU or
less, or has more than a 10
percent increase in turbidity when
the background turbidity is more
than 50 NTU.


Washington,
Small Parcel







>
"O
"O
0
3
Q_
X
>
CD
C
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
CO
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
West Virginia
The 2002 permit states that
sediment basins and traps will be
installed with 3,600 ft3 of storage,
measured from the bottom elevation
of the structure to the top of the riser
or weir, per acre of drainage and will
have draw down times of 48 to 72
hours. For locations on a site that
have a drainage area of 5 acres or
less, a sediment trap which provides
a storage volume equal to 3,600
ft3/acre of drainage area shall be
installed. Half of the volume of the
trap will be in a permanent pool and
half will be dry storage.


7
No


Wisconsin

The Technical Standards document
states that basins shall be used for
greater than 5 to 100 acres. The sizing
criteria for determining treatment surface
area of a sediment basin are based on
the soil texture and peak outflow during
the 1-year, 24-hour design storm. The
overflow spillway should be designed to
carry the peak rate of runoff expected
from a 10-year, 24-hour design storm.
Not specified.
N/A
The current standard in Wisconsin
(NR 151.11 pg 409) requires
construction sites to implement
erosion and sediment controls to
reduce to the maximum extent
practicable 80 percent of the
sediment load carried in runoff on
an annual basis, compared to a
baseline of no sediment or
erosion controls.


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
cn
State requirements: Environmental Protection Agency (EPA) 2007
State
Sediment basin general
requirements
Sediment basins notes/other
requirements
Soil stabilization
Notes/other requirements
Days
Numeric standard
Water quality
requirements
Other notes
Wyoming
No sizing criteria in permit.
The 1999 Urban Best Management
Practice (BMP) manual says use basins
for 5 to 100 acres.
Temporary stabilization (such as
cover crop plantings, mulching or
erosion controls blankets, surface
roughening, etc.) for exposed soil
areas where activities have
permanently or temporarily
ceased should be installed
whenever practicable in areas
where further work is not
expected for 28 days or more.
28 (see
notes)
Wyoming water quality
regulations (Section 23, Page 1-
20) require that discharge of
substances attributable to or
influenced by the activities of man
shall not be present in quantities
which would result in a turbidity
increase for cold water fisheries
and drinking water supplies
(classes 1, 2AB, 2A, and 2B),
shall not result in a turbidity
increase of more than ten (10)
nephelometric turbidity units
(NTUs). In all warm water or
nongame fisheries (classes 1,
2AB, 2B and 2C), the discharge of
substances attributable to or
influenced by the activities of man
shall not be present in quantities
which would result in a turbidity
increase of more than 15 NTUs.
An exception to shall apply to the
North Platte River from Guernsey
Dam to the Nebraska line during
the annual silt run from Guernsey
Dam.

There are two
general permits-
one for small and
one for large.
Puerto Rico







District of
Columbia
Basin sizing for 2-year, 24-hour
storm or 3,600 ft3/acre.
Sediment basin requirements for drainage
areas of 10 or more acres.

14
No
For parking lots, city streets,
and high-speed roads, the
runoff depth to be treated
for post-development land
use is 0.5 inch. For rooftops,
sidewalks, pedestrian plaza
areas, the runoff depth is
0.3 inch

>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
CO
a>
State requirements: 2004 Technical Development Document (TDD) Section 7
State
Sediment basin storage volumes (ft3/acre
drained)
Sediment basin requirements for
drainage areas >_10 acres
Seeding requirements 14 days post-
construction
Alabama
3,600
Yes
No
Alaska
3,600
Yes
Yes
Arizona
3,600
Yes
Yes
Arkansas
3,600
Yes
Yes
California
3,600
Yes
No
Colorado
1,800
No
No
Connecticut
1,800
No
No
Delaware
3,600
Yes
Yes
Florida
3,600
Yes
Yes
Florida, DEP, Northern District
(applies only in NW Florida)



Florida, South Florida Water
Management District (General,
Standard General, Noticed General
and Individual Permits)



Florida, Southwest Florida Water
Management District



Florida, St. Johns River Water
Management District



Florida, Suwannee River Water
Management District



Georgia
1,800
No
Yes
Hawaii
1,800
No
No
Idaho
3,600
Yes
Yes
Illinois
1,800
No
Yes
Indiana
1,800
No
Yes
Iowa
3,600
Yes
Yes
Kansas
3,600
Yes
No
Kentucky
3,600
Yes
Yes
Louisiana
3,600
Yes
No
Maine
3,600
Yes
Yes
Maryland
1,800
No
No
Massachusetts
3,600
Yes
Yes
Michigan
3,600
Yes
No
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
-vl
State requirements: 2004 Technical Development Document (TDD) Section 7
State
Sediment basin storage volumes (ft3/acre
drained)
Sediment basin requirements for
drainage areas >_10 acres
Seeding requirements 14 days post-
construction
Minnesota
3,600
Yes
No
Mississippi
3,600
Yes
No
Missouri
1,800
No
No
Montana
1,800
No
No
Nebraska
1,800
No
No
Nevada
3,600
Yes
Yes
New Hampshire
3,600
Yes
Yes
New Jersey
1,800
No
No
New Mexico
3,600
Yes
Yes
New York
3,600
Yes
Yes
North Carolina
3,600
Yes
No
North Dakota
1,800
No
No
Ohio
1,800
No
Yes
Oklahoma
3,600
Yes
Yes
Oregon
1,800
No
No
Pennsylvania
3,600
Yes
No
Rhode Island
1,800
No
No
South Carolina
3,600
Yes
Yes
South Dakota
3,600
Yes
Yes
Tennessee
3,600
Yes
Yes
Texas
3,600
Yes
Yes
Utah
3,600
Yes
Yes
Vermont
1,800
No
No
Virginia
3,600
Yes
Yes
Washington
1,800
No
No
Washington, Small Parcel



West Virginia
3,600
Yes
Yes
Wisconsin
1,800
No
No
Wyoming
1,800
No
No
Puerto Rico



District of Columbia
3,600
Yes
Yes
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
73
0
_Q
0
3
0

-------
>
I
CO
CO
State Requirements: 2002 Technical Development Document (TDD) Appendix A
State
Numeric standard or
pollutant reduction
requirements
Minimum depth of runoff or
storm return frequency to
treat for water quality
management (per acre)
Maximum allowed
denuded acreage or
soil stabilization
requirement
Notes
Alabama
Turbidity < 50 NTU.



Alaska
Total Suspended Solids
greater than 20 microns.
2 year/6 hour

An inspector must be qualified personnel provided by the
discharger.
Arizona




Arkansas

10 year/24 hour

Developers must submit erosion and sediment control plan
and SWPPP before filing a notice of intent. Sites greater
than or equal to 10 acres must implement a temporary or
permanent sediment basin. Sites less than 10 acres must
implement sediment traps and silt fences.
California

2 year/24 hour

Inspections will be performed before anticipated storm
events, during extended storm events, and after storm
events, and at least once each 24-hour period during
extended storm events to identify BMP effectiveness and
implement repairs or design changes as soon as feasible
depending on field conditions. A discharger is also
responsible for inspecting and cleaning all public and
private roads for sediment. Construction activities that fall
under the jurisdiction of the California Department of
Transportation (CALTRANS) have separate a permit and
regulations.
Colorado



Stormwater management plan must be submitted to state
for a 10-day review, as well as be retained on site. PG
determined: A certification verifying that the Stormwater
Management Plan (SWMP) is complete must be submitted
to state 10 days before beginning construction activities, as
well as being retained on site during construction activities.
The SWMP shall be prepared in accordance with good
engineering, hydrologic and pollution control practices.
Connecticut
80 percent TSS reduction.



Delaware
80 percent TSS reduction.
0.5 inch


Florida




Florida , DEP, Northern
District (only applies in NW
Florida)
80 percent TSS reduction.
0.5 inch

*> 100 acres, 1 inch rainfall; < 100 acres, 0.5 inch rainfall
>
"O
"O
0
3
Q_
X
>
CD
C
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
CO
CD
State Requirements: 2002 Technical Development Document (TDD) Appendix A
State
Numeric standard or
pollutant reduction
requirements
Minimum depth of runoff or
storm return frequency to
treat for water quality
management (per acre)
Maximum allowed
denuded acreage or
soil stabilization
requirement
Notes
Florida, South Florida Water
Management District
(General, Standard General,
Noticed General and
Individual Permits)

1 inch


Florida, Southwest Florida
Water Management District

0.5 inch


Florida, St. Johns River Water
Management District
Turbidity less than 29 NTU.



Florida, Suwannee River
Water Management District
80 percent TSS reduction.
1 inch


Georgia
Turbidity less than 10 to 25
NTUs.
25 year/24 hour

Turbidity < 25 NTUs for waters supporting warm water
fisheries, or <10 NTUs for waters classified as trout waters.
Hawaii



Construction shall be phased for large projects; one phase
must be stabilized before another can begin. A 50-day
maximum from removal of pre-construction conditions to
temporary stabilization.
Idaho




Illinois

3,600 ft3/acre


Indiana




Iowa
80 percent TSS reduction.



Kansas




Kentucky
Goal of 80 percent TSS
reduction (compared to pre-
construction levels).



Louisiana




Maine
40 to 80 percent TSS
reduction
2 year


Maryland
80 percent TSS reduction
based on the average annual
TSS loading from all storm
events less than or equal to
the 2-year/24-hour storm.
2 year/24 hour


Massachusetts
80 percent TSS reduction
2 year/24 hour


Michigan

3,600 ft3/acre

Sites greater than 10 acres require an on-site temporary
sediment basin.
>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
O
State Requirements: 2002 Technical Development Document (TDD) Appendix A
State
Numeric standard or
pollutant reduction
requirements
Minimum depth of runoff or
storm return frequency to
treat for water quality
management (per acre)
Maximum allowed
denuded acreage or
soil stabilization
requirement
Notes
Minnesota

0.5 inch


Mississippi




Missouri
Settleable Solids < 0.5 to 2.5
ml/L per hour.


Settleable solids less than 2.5 ml/L per hour for normal land
disturbance, and 0.5 ml/L per hour for land disturbance
within sensitive areas.
Montana

2 year/24 hour

Dischargers must submit with the state application form a
stormwater erosion control plan (SWECP) that resembles
EPA's construction site SWPPP. Permit coverage begins
only when Montana Department of Environmental Quality
reviews and approves the SWECP. Inspections must also
be conducted everyday during prolonged precipitation or
snowmelt periods. A registered Professional Engineer must
prepare the SWESCP if the site is greater than 20 acres.
Also regulate down to 1 acre if the construction site is
within 100 feet of a surface waterbody. Montana has a
sediment and erosion control guidance manual that lists
standard use BMPs. If other BMPs are used, they need to
be submitted with SWECP to the state for approval. For
slopes steeper than 3:1 and greater than 5 vertical feet,
surface roughening is required. Filter fences should be
used on drainage areas >1 acre; sediment traps should be
used only on drainage areas > 3 acres; and temporary
sediment ponds should be used only on drainage areas >
10 acres.
Nebraska




Nevada




New Hampshire




New Jersey




New Mexico




New York

0.5 inch


North Carolina


20 acres of total
disturbance at any
given time for areas
discharging to high-
quality waters.

North Dakota




Ohio




>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
State Requirements: 2002 Technical Development Document (TDD) Appendix A
State
Numeric standard or
pollutant reduction
requirements
Minimum depth of runoff or
storm return frequency to
treat for water quality
management (per acre)
Maximum allowed
denuded acreage or
soil stabilization
requirement
Notes
Oklahoma

3,600 ft3/acre

A vegetated buffer zone of at least 100 feet must be
retained or successfully established between the area
disturbed during construction and all perennial or
intermittent streams on or adjacent to the construction site.
A vegetated buffer zone at least 50 feet wide must be
retained or established between the area disturbed during
construction and all ephemeral streams or drainages.
Treatment volume is the lesser of 3,600 ft3 or the runoff
volume of a 2-year, 24-hour storm.
Oregon



If the site is greater than 20 acres, an erosion and sediment
control plan must be prepared by a Professional Engineer,
or Registered Landscape Architect, or Certified
Professional in Erosion and Sediment Control, and the plan
must be submitted 90 days before construction begins. All
permittees must submit an Oregon Land Use Compatibility
Statement if they do not already have one on file with
Oregon Department of Environmental Quality.
Pennsylvania

5 year

Basins volumes should drain no quicker than 4 days and
no longer than 7 days.
Rhode Island
80 to 90 percent TSS
reduction.
10 year


South Carolina
80 percent TSS reduction.
3,600 ft3/acre

Sediment trapping efficiency is a performance-based
requirement for any BMPs. The major requirements for
stormwater control plans are application, location map, type
and location of BMPs, construction sequencing, location of
disturbed areas, property line and waters of the state,
standard notes, grassing specifications. The minimum
required volume for water quality management is 3,600 ft3
for a disturbed area of more than 10 acres. If there is not a
sediment basin of 3,600 ft3 and the drainage area is less
than 10 acres, sediment traps, silt fences, or equivalent
measures are needed for sideslope and downslope
boundaries for the construction area. However, the first 0.5
inch rainfall runoff in a 24-hour period is applicable to the
coastal counties only.
South Dakota

5 year


Tennessee



The permittee shall maintain records of all inspection and
maintenance.
Texas

3,600 ft3/acre


>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
>
I
ro
State Requirements: 2002 Technical Development Document (TDD) Appendix A
State
Numeric standard or
pollutant reduction
requirements
Minimum depth of runoff or
storm return frequency to
treat for water quality
management (per acre)
Maximum allowed
denuded acreage or
soil stabilization
requirement
Notes
Utah

1 inch or 24-hour storm event

Where sites have been finally or temporarily stabilized, or
when runoff is unlikely because of winter conditions or
during seasonal arid periods in arid areas and semiarid
areas inspections shall be conducted at least once every
30 days. Runoff volume from a 10-year, 24-hour storm
event for 10 or more disturbed acres shall be evaluated for
water quality. For areas less than 10 acres or where
calculations for the volume of runoff for disturbed acres is
not performed, a sediment basin providing 3,600 ft3 of
storage per acre drained or equivalent control measures
shall be provided. (1) Where the initiation of stabilization
measures by the 14th day after construction activity has
temporary or permanently ceased is precluded by snow
cover or frozen ground conditions, stabilization measures
shall be initiated as soon as possible. (2) In arid areas,
semiarid areas, and areas experiencing droughts where the
initiation stabilization measures by the 14th day after
construction activity has temporarily or permanently ceased
is precluded by seasonal arid conditions, stabilization
measures shall be initiated as soon as practicable.
Vermont




Virginia

3,600 ft3/acre

Sediment basins required for sites of 10 acres or more
(except those with final stabilization); for sites less than 10
acres, the same units are required but only for sideslope
and downslope boundaries of construction sites.
Washington, Large Parcel

24 hour/6 month
2 days between
October 1 and April 30
(i.e., the wet season); 7
days between May 1 to
September 30 (dry
season)

Washington, Small Parcel

24 hour/6 month
2 days between
October 1 and April 30
(i.e., the wet season); 7
days between May 1 to
September 30 (dry
season)

West Virginia

2 year


Wisconsin




>
"O
"O
0
3
Q_
X
>
CD
c
3
3
Q)
0
CO
1	I
Q)
i i
0
O
o
o
J
o'
D
0
<
0_
O
"O
3
0
Z)
0
_Q
0
3
0

-------
State Requirements: 2002 Technical Development Document (TDD) Appendix A
State
Numeric standard or
pollutant reduction
requirements
Minimum depth of runoff or
storm return frequency to
treat for water quality
management (per acre)
Maximum allowed
denuded acreage or
soil stabilization
requirement
Notes
Wyoming
Turbidity less than 10 to 15
NTUs.



Puerto Rico




District of Columbia





-------
Appendix B
Literature Search Annotated Bibliography

-------
Appendix B: Literature Search Annotated Bibliography
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Peter T. Weiss,1 John S. Gulliver,2 and Andrew J. Erickson3
2007
Cost and Pollutant Removal of Stormwater Treatment Practices
1 Valparaiso University
2'3 University of Minnesota
Journal of Water Resources Planning and Management
Volume 133, Issue 3, pp. 218-2229 (May/June 2007)
Six stormwater best management practices (BMPs) for treating urban rainwater
runoff were evaluated for cost and effectiveness in removing suspended
sediments and total phosphorus. Construction and annual operating and
maintenance (O and M) cost data were collected and analyzed for dry extended
detention basins, wet basins, sand filters, constructed wetlands, bioretention
filters, and infiltration trenches using literature that reported on existing
stormwater BMP sites across the United States. After statistical analysis on
historical values of inflation and bond yields, the annual O and M costs were
converted to a present worth based on a 20-year life and added to the
construction cost. The total present cost of each stormwater BMP with the 67%
confidence interval was reported as a function of water quality design volume,
again with a 67% confidence interval. Finally, the mass of TSS and total
phosphorus removed over the 20-year life was estimated as a function of the
water quality volume. For the six stormwater BMPs investigated, results show
that, ignoring land costs, constructed wetlands have been the least expensive to
construct and maintain if appropriate land is available. However, since wetlands
typically require more land area to be effective, land acquisition costs may result
in wetlands being significantly more expensive than other stormwater BMPs
that require less area. The results can be used by planners and designers to
estimate both the total cost of installing a stormwater BMP and the
corresponding total suspended solids and total phosphorus removal
Comments: Summarizes recent cost work and presents best fit curves and 67 percent
confidence intervals as ranges. The presentation of total capital costs assumes
construction costs plus the present worth of 20 years of operating and
maintenance costs. Paper was reviewed as part of EPA's review of costs for
permanent sedimentation ponds and sand filters.
	It also summarizes removal efficiencies for TSS and Phosphorus by BMP.
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
P. Kaini, K. Artita, and J. W. Nicklow
2007
Evaluating Optimal Detention Pond Locations at a Watershed Scale
Department of Civil and Environmental Engineering, Southern Illinois
University
World Environmental and Water Resources Congress 2007
Structural BMPs like stormwater basins (detention and retention basins),
wetlands, filter strips and grassland swales are extensively used as stormwater
runoff controls. BMPs are often designed for peak flow reduction or pollution
B-1

-------
Appendix B: Literature Search Annotated Bibliography
control or can be considered for dual purpose in that they provide both water
quality and quantity benefits by relying upon storage allocation and key
mechanisms of setting filtration, sorption, biodegradation and
evapotranspiration. In spite of previous studies, there exists neither a
methodology nor a generalized model for selecting, placing, and sizing BMP
combinations that cost-effectively promotes achievement of treatment goals at
larger spatial scales. This paper presents part of an ongoing research effort to
develop a new, comprehensive decision support tool for watershed-scale BMP
design. The current model is designed to identify detention pond sizes that best
achieve target peak flow reduction criteria. It is developed by coupling the
U.S. Department of Agriculture's (USDA) Soil and Water Assessment Tool
(SWAT) and a genetic algorithm. The model is applied to Silver Creek
watershed, a subbasin of the larger Lower Kaskaskia watershed in Illinois. The
results show that detention ponds can be designed at a holistic, watershed scale
to more effectively achieve peak flow reduction goals. Future work will focus
on expansion of the model, which will also be disseminated through outreach
workshops in portions of Illinois and surrounding states.
Comments: Basin-wide design does not yet appear to be a viable option. The paper notes,
"Despite these efforts [previous studies], there exists neither a methodology
nor a generalized model for selecting, placing, and sizing BMP combinations
that cost effectively promote achievement of treatment goals at the watershed
scale. This paper presents ongoing research to develop a new, comprehensive
decision support tool for watershed-scale BMP design."
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Fu-hsiung Lai, Jenny Zhen, John Riverson, and Leslie Shoemaker
2006
SUSTAIN—An Evaluation and Cost-Optimization Tool for Placement of
BMPs
Tetra Tech, Fairfax, VA
World Environmental and Water Resources Congress 2006
To assist stormwater management professionals in planning for best
management practices (BMPs) implementation, the U.S. Environmental
Protection Agency (EPA) is developing a decision-support system for
placement of BMPs at strategic locations in urban watersheds. This tool will
help develop, evaluate, select, and place BMP options based on cost and
effectiveness. The system was formerly called the Integrated Stormwater
Management Decision Support Framework (ISMDSF), but will be tentatively
called the System for Urban Stormwater Treatment and Analysis INtegration
(SUSTAIN). SUSTAIN, a generic public domain framework, will provide a
means for objective analysis of management alternatives among multiple
interacting and competing factors. The desired outcome from the system
application is a thorough, practical, and informative assessment considering
economic, environmental, and engineering factors. SUSTAIN has seven key
components: framework manager, ArcGIS interface, watershed model, BMP
B-2

-------
Appendix B: Literature Search Annotated Bibliography
model, optimization model, post-processor, and Microsoft Access database.
They are integrated under a common ArcGIS platform. SUSTAIN supports
evaluation of BMP placement at multiple scales from a few city blocks to
large watersheds.
Comments: Basin-wide design does not yet appear to be a viable option. EPA is
developing a decision-support system for placement of BMPs at strategic
locations in urban watersheds. This tool will help develop, evaluate, select,
	and place BMP options on the basis of cost and effectiveness.	
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Yuan Cheng, Ph.D., P.E.
2006
Extended Analysis for Sediment Pond Design
Benatec Associates, Inc.
World Environmental and Water Resources Congress 2006
An example of extended analysis for sediment pond design is presented. The
sediment pond is designed to trap the suspended sediment carried by surface
runoff from a construction site. Extended analysis can show dynamic changes
of the velocity field in a pond as well as suspended sediment distribution from
the pond inlet to the outlet. Results from the analysis can be used by designers
to adjust pond size and shape for more effective reduction of sediment
discharge that varies with time at the pond outlet.
Comments: Presents site-specific two-dimensional finite analysis approach for designing
	pond shape and size.	
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Michael E. Barrett
2003
Performance, Cost, and Maintenance Requirements of Austin Sand
Filters
Center for Research in Water Resources, University of Texas, Austin, TX
Journal of Water Resources Planning and Management
Volume 129, Issue 3, pp. 234-242 (May/June 2003)
Five Austin-style sand filters were constructed by the California Department
of Transportation (Caltrans) as retrofit projects for maintenance yards and
park-and-ride facilities in the Los Angeles and San Diego metropolitan areas.
Each of these filter systems included stormwater monitoring equipment for
collection of flow weighted composite samples. In addition, detailed records
were compiled of the design elements, construction costs, and type and
amount of maintenance required at each of the sites. The construction costs
were relatively high because of the retrofit nature of the project and the
integration of the Caltrans storm-drain system with those of the adjoining
metropolitan areas, which eliminated any opportunities for economies of scale.
An analysis of performance using linear-regression techniques indicated that
for sediment and almost all particle associated constituents, effluent
concentration was independent of influent concentration. For instance, the
B-3

-------
Appendix B: Literature Search Annotated Bibliography
average suspended solids concentration in treated runoff was 7.8±1.2 mg/L (at
the 90% confidence level) regardless of observed influent concentration. The
constant effluent quality produced for the particulate constituents indicates that
the calculation of a percent reduction is more indicative of the influent
concentration rather than the performance of the filter itself. Rejuvenation of
the filter bed was required at three sites after 3 years of operation when the
solids loading to the system was between 5 and 7.5 kg/m2 of filter area.
However, the clogging may have been accelerated by problems with the
pumps that resulted in standing water on the filter for extended periods. Other
maintenance activities consisted mainly of inspections, pump repair, and
activities to reduce mosquito breeding. The main impediment to widespread
implementation is the initial construction cost; however, modifications of the
filter configuration and media may reduce these costs and increase
effectiveness, thereby making the technology more attractive.
Comments: Warrants further review if EPA evaluates use of sand filtration in meeting
numerical standards. The article notes that it is difficult to determine the
validity of the 1993 construction costs ("Guidance specifying management
measures for sources of nonpoint pollution in coastal waters"). Note that the
any use of the costs and removals from this study would need to consider that
the site selection in this study was limited to relatively small, impervious
watersheds. "The most important consideration was the extent to which runoff
from unstabilized areas would be able to enter the filter. The biggest threat to
the long-term successful operation of any filter is the introduction of excessive
amounts of sediment that cause premature clogging of the filter media. For this
reason, site selection was limited to relatively small, impervious watersheds
(park-and-ride areas and maintenance stations)."	
R. M. Hozalski, A. Erickson, and J. S. Gulliver
2007
A New Approach for Assessing the Performance of Stormwater Best
Management Practices
University of Minnesota, Department of Civil Engineering
Proceedings of the World Environmental and Water Resources Congress
2007
One approach for improving the quality of stormwater runoff before it enters
the receiving water is to install stormwater BMPs. Stormwater BMPs include a
wide range of systems (rain gardens, ponds, wetlands, underground
proprietary sediment removal devices, etc.) used to reduce stormwater runoff
quantity or improve stormwater quality, or both. No standard methodology for
assessment of stormwater BMPs is available. Therefore, we propose a tiered
approach to stormwater BMP assessment that is termed the "Four levels of
assessment" (Table 1), that are numbered in order of increasing difficulty
and cost. Developers of an assessment program should consider each of four
levels of assessment in order, and consider advancing to next level only when
requirements of the assessment program have not been satisfied. All	
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
B-4

-------
Appendix B: Literature Search Annotated Bibliography
stormwater BMP assessment programs should include regularly scheduled (at
least annual) visual inspections (level 1). In addition to visual inspections,
capacity testing (level 2) and/or simulated runoff testing (level 3), if
warranted, should be included in stormwater BMP assessment programs at
regular intervals to determine the performance of a BMP immediately after
installation and to determine how performance of a stormwater BMP is
changing with respect to time, changes in the watershed, or both. If the goals
of the assessment program cannot be met by capacity testing or simulated
runoff testing, or these techniques are not feasible, then monitoring (level 4)
should be implemented as part of the assessment program.
Comments: Describes performance assessment of BMPs through visual inspections,
	capacity testing, simulated runoff testing, and/or monitoring.	
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
J. M. Hathaway, W.F. Hunt, R.A. Smith, and K.L. Bass
2007
Innovative Stormwater Treatment Practices in the Neuse and Tar-
Pamlico Basins
North Carolina State University, Biological and Agricultural Engineering
Department
Proceedings of the World Environmental and Water Resources Congress
2007
Urbanization within North Carolina's watersheds and the need for proactive
mitigation led to the establishment of the North Carolina Ecosystem
Enhancement Program (EEP) in July 2003. The EEP is responsible for the
majority of mitigation efforts throughout the state. These efforts include the
restoration, enhancement, and preservation of streams and wetlands, as well as
the creation of stormwater best management practices (BMPs) for the purpose
of maintaining and improving water quality and riparian habitats across the
state.
This project involves a partnership between EEP and the Biological and
Agricultural Engineering Department (BAE) at North Carolina State
University for the purpose of locating, designing, and monitoring stormwater
BMPs. In addition, local governments and the North Carolina Cooperative
Extension Service assist in project site selection and development.
Two large river basins in North Carolina, Neuse and Tar-Pamlico, have
historic, significant degradation to water quality partially because of
urbanization and agricultural practices. Primary pollutants within these basins
include nitrogen and phosphorous. To change the trend of degradation, the
State of North Carolina enacted regulations for nitrogen and phosphorous
removal specifically for these basins. These regulations provided for the
funding of the EEP Nutrient Reduction Program by authorizing impact fees.
Comments: Provides "an example of how academic institutions and state governments can
work together to develop programs to identify design, and build retrofit
stormwater BMPs."
B-5

-------
Appendix B: Literature Search Annotated Bibliography
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Kelly A. Collins, William F. Hunt, and Jon M. Hathaway
2007
Evaluation of Various Types of Permeable Pavements with Respect to
Water Quality Improvement and Flood Control
North Carolina State University, Biological and Agricultural Engineering
Department
Proceedings of the World Environmental and Water Resources Congress
2007
In many U.S. states, different permeable pavement types are considered to
have the same capabilities in reducing runoff, and they are not credited with
improving water quality. To test various permeable pavement designs, a
parking lot consisting of four different types of permeable pavements and
standard asphalt was constructed in Kinston, NC. The permeable pavement
sections consist of pervious concrete (PC), permeable interlocking concrete
pavers (PICP) with 8.5 % void space, PICP with 12.9 % void space, and
concrete grid pavers (CGP), each covering a 1200 sq. ft. area with a 10 in.
gravel storage layer. The purpose of this study is to evaluate and compare the
effects of each pavement type on water quality and runoff reduction. Site
analyses on every rainfall event began in March, 2006, and will continue
through March, 2007. Preliminary results indicate significant (p<0.05) peak
flow and volume reductions from all permeable pavements. Additionally, there
has been little to no runoff observed from any of the pervious sections.
Pollutant removal performance by the pavements has widely varied. As a
result of this study, it is expected that the state of North Carolina will make a
judgment on how much pollutant removal credit permeable pavement types
should receive. Also, this study may be used to determine whether or not
stormwater credit should vary based on pavement type.
Comments: Evaluates parking lot runoff from various permeable pavement designs.
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Ben Urbonas,1 and Jim Wulliman2
2007
Stormwater Runoff Control Using Full Spectrum Detention
1	Urban Drainage and Flood Control District, Denver, CO
2	Muller Engineering Company, Lakewood, CO
Proceedings of the World Environmental and Water Resources Congress
2007
The goal of controlling peak flow rates at individual sites to pre-developed
levels can be met using detention basins for design storms from 2- to 100-year
return periods. However control of peak storm runoff flows along receiving
streams by multiple detention basins operating simultaneously within larger
urban catchments are much more difficult to achieve. The latter topic was
studied in the past by several investigators, but the findings were very limited
in scope and were focused primarily on larger runoff events such as the 10-
year to 100-year flows. At the same time, there is evidence that stream	
B-6

-------
Appendix B: Literature Search Annotated Bibliography
geometry, water quality and aquatic habitat are impacted significantly whether
this type of detention is used, or not, as areas urbanize. The profound
hydrologic and geomorphic changes caused by urbanization require more
robust control of the frequently occurring, smaller, runoff events. In response
to this, different approaches toward designing stormwater detention were
investigated and modeled by the authors. This testing was first done using
design storm protocols employed by the Urban Drainage & Flood Control
District for the Denver area of Colorado and then followed up using the EPA
SWMM 5.0 model calibrated to 15-years of recorded 5-minute rainfall (5
gages) and runoff (2 gages) data for a 3.1 square mile watershed. This paper
presents the findings most applicable for the Denver region and other locations
having similar precipitation patterns; however, the underlying principles used
to develop this concept can be used to develop design protocols for other
hydrologic regions of the USA and other countries.
Comments: Describes a watershed-wide approach for minimizing the excess urban runoff
volume (difference between urban and pre-development), including smaller
	rain events such as the 2-year storm.	
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Dianna M. Hogan1'2 and Mark Walbridge3
2007
Best Management Practices for Nutrient and Sediment Retention in
Urban Stormwater Runoff
department of Environmental Science and Policy, George Mason University,
Fairfax, VA
2Eastern Geographic Science Center, U.S. Geological Survey, Reston, VA
3Department of Biology, West Virginia University, Morgantown, WV
Journal of Environmental Quality
Stormwater management infrastructure is used in urban areas to alleviate
flooding caused by decreased landscape permeability from increased
impervious surface cover (ISC) construction. In this study, we examined two
types of stormwater detention basins, SDB-BMPs (stormwater detention
basin-best management practice), and SDB-FCs (stormwater detention basin-
flood control). Both are constructed to retain peak stormwater flows for flood
mitigation. However, the SDB-BMPs are also designed using basin
topography and wetland vegetation to provide water quality improvement
(nutrient and sediment removal and retention). The objective of this study was
to compare SDB (both SDB-BMP and SDB-FC) surface soil P concentrations,
P saturation, and Fe chemistry with natural riparian wetlands (RWs), using
sites in Fairfax County, Virginia as a model system.
Comments: Study compares nutrient and sediment retention in urban stormwater runoff for
stormwater detention basin BMPs and stormwater detention basin flood
control.
B-7

-------
Appendix B: Literature Search Annotated Bibliography
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Arvind Narayanan and Robert Pitt
2006
Cost of Urban Stormwater Control Practices
University of Alabama
This report is a consolidated and summary of information obtained from the
following major reports on costs of stormwater controls, plus additional
specialized references:
•	Costs of Urban Nonpoint Source Water Pollution Control Measures
prepared by Southeastern Wisconsin Regional Planning Commission
1991
•	Costs of Urban Stormwater Control by Heaney, Sample, and Wright for
USEPA 2002
•	BMP Retrofit Pilot Program prepared by CALTRANS 2001
This research presents a method to determine the costs of several types of
stormwater control practices including the costs of conventional drainage
system. Several published literature sources were reviewed that contained
costs of control practices. Standard unit cost data used in developing the
conventional conveyance drainage system costs were obtained from RS
Means. The cost data were transformed into equations and used to develop the
cost module for the Source Loading and Management Model WinSLAMM).
An Excel spreadsheet model was also developed to estimate the costs of
conventional stormwater drainage systems based on the published unit cost
data. In an example, the costs estimated by the spreadsheet model were
compared to the costs associated with the stormwater control practices as
estimated by WinSLAMM for a 250-acre industrial site in Huntsville, AL. The
costs of site biofiltration, large-scale grass swales, and a wet detention pond
were compared to the costs for the conventional drainage system. The cost
information available from published literature sources and other references
were in the form of tables and equations. The cost information gathered
provided regional cost estimates for the control practices for a specific year.
Cost indices published by the Engineering News-Record were used to estimate
the present costs from historical cost information and at locations where cost
information is unavailable. These cost indices, from 1978 to 2005, were
incorporated into WinSLAMM and the spreadsheet model. Based on the cost
data obtained form Southeastern Wisconsin Regional Planning Commission
(1991), the component(s) that affected the control practice cost the most were
also analyzed
Comments: References previously used documents for sedimentation basins (1976 EPA,
Cost Estimating Manual—Combined Sewer Overflow Storage and Treatment,
referenced in subsequent EPA documents (1993 and 1999)) and detention
ponds (Young et al. 1996, the out-of-date 1986 equations referenced in
Schueler 2000).
Sand filter information references CALTRANS 2004, which was included in
EPA's review of sand filters.
B-8

-------
Appendix B: Literature Search Annotated Bibliography
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Comments:
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Comments:
Dennis Jurrie, P.E.
Unknown
Flocculation of Construction Site Runoff in Oregon
Sisul Engineering
Unknown
Describes flocculation for treating stormwater runoff from construction sites.
Includes sampling results for Sumalchlor 50 (a Polyaluminum Chloride) at a
corporate park construction site in Oregon. Provides a cost to treat and
flocculate stormwater runoff of $0.08 per gallon of water treated. Warrants
additional review as part of the evaluation of numerical standards.	
Eric Woodhouse and Tiffany Leop
2007
Temporary Slope Protection: Cost Versus Effectiveness
Landscape Development, Inc.
StormCon 2007
Landscape Development, Inc., conducted a study in Santa Clarita, CA. Eight
products and applications were tested on 1000 square foot, 2:1 slope panels
during the heavy rain season of 2004-2005. The rains in this area accumulated
to over 40 inches between October and May. The products and applications
tested include straw blanket, blown straw with organic binder-tackifier,
straw/coco blanket, coconut blanket, jute netting, wood fiber mulch and
organic binder, a preblended stabilized fiber matrix (SFM) with two stabilizer
components (a tackifier and cross link binder), and another stabilized fiber
matrix (SFM) with one stabilizing component consisting of wood fiber mulch
with polyacrylimide stabilizer. Four soil loss samples were taken over the
course of the study. The weight of the soil lost was accumulated and used in
comparing the performance of the varying products and applications. The
blanket products performed better, overall, for retaining the soil on the slope
face when compared for amount of soil lost per inch of rainfall. The cost
comparison for all the products and applications showed comparable pricing
when extended over the duration of the product/application's effective lifeline.
Cost comparisons for the various applications in regards to lifespan and price
per square foot are presented in this paper.
Provides a comparison of soil loss, price per square foot, and lifespan for
various erosion controls (straw blanket, blown straw with organic binder-
tackifier, straw/coco blanket, coconut blanket, jute netting, wood fiber mulch
and organic binder, a preblended stabilized fiber matrix (SFM) with two
stabilizer components (a tackifier and cross link binder), and another stabilized
fiber matrix (SFM) with one stabilizing component consisting of wood fiber
mulch with polyacrylimide stabilizer). The study notes, "It can be seen that
cost is directly correlated with the lifespan of the application as well as the
effectiveness in minimizing soil loss." The article might be useful for
inclusion in the updated technical development document.	
B-9

-------
Appendix B: Literature Search Annotated Bibliography
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
David Wachal
2007
BMP Selection for Land Disturbance: A Methodology Based on
Efficiency, Cost, and Site Management Goals
City of Denton, Texas
StormCon 2007
This paper presents a methodology for developing a BMP selection tool for
disturbed hillslopes based on BMP efficiency, BMP implementation costs, and
site management goals. To demonstrate how the methodology was developed
and applied, a case study focusing on Natural Gas Exploration and Production
(NGE&P) sites is presented. Version 2 of the Revised Universal Soil Loss
Equation (RUSLE2) was used to evaluate sediment yields for several
combinations of BMPs, slopes, and soil types, and based on the modeling
results, BMP efficiency values were computed for each possible combination.
Efficiency values for the various slope and soil combinations revealed that
both slope and soil type influences the effectiveness of the BMPs. The
efficiency values were incorporated into a selection tool that also included
estimated BMP implementation costs. While this paper focuses on NGE&P
sites, the methodology presented is easily adaptable to other types of disturbed
site conditions.
Comments: Project evaluated BMP efficiencies and costs for BMPs (seeding, mulching,
erosion blanket, silt fence, and vegetated filter strip) and BMP combinations
for disturbed hillsides in Natural Gas Exploration and Production. The method
uses RUSLE2 (for possible combinations of three soil types and three slope
profiles) as an erosion prediction tool. The methodology then uses the Best
Management Practices Assessment Tool (BMPSAT) to evaluate efficiencies
and costs on the basis of soil and slope combinations. The article states that
BMPSAT is an Excel spreadsheet that could be modified for additional
evaluations of BMPs or site characteristics and that the flexibility of RUSLE2
allows BMPSAT to be easily customized for complex or simple slopes,
specific site characteristics, and to include additional BMPs.
Costs for the BMPs included in the analysis are from EPA-842-B-02-003
(National management measures to control nonpoint source pollution from
urban areas - draft). The modeling methodology could be of interest for soil
	modeling.	
Author(s):
Date:
Title:
Organization:
Source:
Autumn DeWoody
2007
Cost-Effectiveness of Stormwater Infiltration BMPs in Los Angeles
County
University of California, Riverside
StormCon 2007
B-10

-------
Appendix B: Literature Search Annotated Bibliography
Abstract: Current stormwater regulations require infiltration and/or treatment of the
runoff generated by a minimum rain depth or flow rate at new developments
or redevelopments above a threshold size, but most existing facilities in Los
Angeles are not required to mitigate their onsite runoff. Available information
on stormwater infiltration BMP costs is often vague or inadequate and
outdated, and there is little data on urban Southern California BMP costs. This
research aims to provide clarity to decision makers on parcel-level strategies
that comply with stormwater regulations and boost groundwater supply. It
focuses on the retrofit of existing nonresidential parcels with stormwater
infiltration BMPs. The research begins with five cost/benefit case studies, then
follows with a BMP cost analysis using local area BMP data, and then
presents a cost-benefit analysis of parcel-level infiltration across a wide
variety of land uses, parcel sizes, and infiltration rates.
Comments: On the basis of a Los Angeles and San Gabriel Rivers Watershed Council
study evaluating the potential to retrofit typical urban neighborhoods to
promote infiltration, this paper evaluates the costs and benefits of retrofits to
determine whether the benefit of increased groundwater recharge justified the
expense of a BMP system. The cost/benefit analysis uses the actual capital
costs for the retrofit sites; the source costs were not presented.	
Jason Ziemer
2007
Complying with NPDES Phase II Requirements on a Major Highway
Construction Project with the Implementation of an Emerging BMP
Clear Water Compliance Services, Inc.
StormCon 2007
The Washington State Department of Transportation (WSDOT) and their
general contractors began a $126.3M construction project along 3.5 miles of
State Route (SR) 18 in Maple Valley, Washington in September, 2003. The
project included 15 new bridges, over 40 retaining walls and required more
than 850,000 cubic yards of earth moving. Initial stormwater engineering and
planning focused primarily on post construction stormwater considerations
included drainage improvements, construction of 14 stormwater storage and
treatment ponds, and the enhancement of 49 acres of wetlands. Planning for
construction-phase stormwater focused almost entirely on implementation and
maintenance of BMPs and was absent of specific considerations for meeting
water quality standards. This lack of planning eventual caused serious
problems and project delays. During the spring of 2004, WSDOT discovered
the general contractor had filled a wetland with woody debris without a
permit. Immediate action was taken by WSDOT, the U.S. Army Corps of
Engineers and the Washington State Department of Ecology (Ecology). This
paper presents the aggressive implementation of BMPs, including the use of
erosion control practices that had to be taken for the project to be in
compliance. Issues of turbidity were also discussed.
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
B-11

-------
Appendix B: Literature Search Annotated Bibliography
Comments: Example of a highway project in Washington State using a Chitosan-enhanced
sand filtration system to meet state requirement of <= 5 NTU above
background. Project specifications required treating 700 gpm with a
continuous effluent turbidity of less than 10 NTU. Article reports nearly
40,000 turbidity data points show an average turbidity of 236 NTU, 42.4 NTU
after pretreatment, and 1.04 NTU average discharge. The average cost per
gallon treated for the project was $0,017 per gallon. Warrants additional
	review as part of the evaluation of numerical standards.	
Author(s):
Date:
Title:
Organization:
Source:
Abstract:
Neil Myers and Ted Blahnik
2007
The Development Paradigm Shift: A Case Study
Williams Creek Consulting
StormCon 2007
This paper presents a case study from Williams Creek Consulting, a firm
specializing in LID and sustainable natural system designs for construction
stormwater management. Because of increased regulatory acceptance,
development companies are now using more sustainable and lower impact
development solutions to provide for regulatory compliance, improve
marketability, increase profit and improve overall quality of life for the
community. A prime example of acceptance for sustainable sites engineering
for natural resource and stormwater management solutions is at a 1,700 acre
mixed-use development in the Midwest. This site is among the national
developer's first attempt at using the more sustainable, lower impact systems
on a large scale and challenged the traditional design and construction delivery
methods within the Midwest. As the site begins to be developed, significant
cost savings are being realized during construction. BMPs planned for this
project included constructed wetlands, vegetated swales, bioretention and rain
gardens, wetland fringe along ponds, linear dry landscaped basins, and more.
Comments: Might be useful for benefits analysis. Case study provides detailed cost
savings from low-impact development (vegetated swale, bioretention and rain
gardens, wetland fringe pond, and dry landscaped basins), reducing costs for
	reinforced concrete storm pipes, storm structures, and site fill.	
Author(s):
Date:
Title:
Organization:
Source:
Jamie Weist and Don Alexander
2007
Saving Time and Money on Construction-Site SWPPPs
Woolpert, Inc.
StormCon 2007
B-12

-------
Appendix B: Literature Search Annotated Bibliography
Abstract: Designed for contractors who must comply with federal, state, and local
stormwater, erosion, and sediment control regulations, this presentation shows
how to reduce the likelihood of fines due to noncompliance. A methodology
and automated process have been developed to help prepare stormwater
pollution prevention plans and comply with permit requirements, particularly
for contractors who are dealing with multiple construction sites.
Comments: The full text of the article is not available.
B-13

-------
Appendix C
Analysis of Construction Industry Trends Using
Notice of Intent Records

-------
Appendix C: Analysis of Construction Industry Trends Using Notice of Intent Records
As described in the Economic Analysis for the Final Rule, the long-term trend analysis provides
an estimate of total acreage for the 2008 trend year. To develop the baseline profile of acreage
activity by state and construction activity sector, the U.S. Environmental Protection Agency
(EPA) distributed the approximately 853,000 acres in proportion to the value of construction
estimated to occur in each state/activity sector. The percentage of the value of construction for
each state and activity sector was based on the percentage of firms, within each revenue range
category, that perform work in that state/activity sector combination. For more information, see
Chapter 4 of Economic Analysis for Final Effluent Guidelines and Standards for the
Construction and Development Category (USEPA 2009).
The baseline analysis develops the estimate of total activity, in terms of acres of construction,
and apportions this acreage out among the state and activity sectors, but it does not account for
the number of acres developed in different project configurations, which can vary across a
variety of factors but most especially with respect to project size and duration. To accurately
characterize the heterogeneity in construction project size and duration, EPA relied on project-
specific information in Notice of Intent (NOI) records. To obtain required coverage under a
construction general permit, a discharger submits to the permitting authority an NOI to be
covered under the general permit. By submitting the NOI, the discharger acknowledges that it is
eligible for coverage under the general permit and agrees to the conditions in the published
general permit.
The information required under an NOI varies from state to state, and state permitting authorities
are not required to submit their NOI information to EPA. However, some states have voluntarily
submitted their NOI data to the Agency. Table C-l lists the 37 states from which EPA was able
to obtain NOI data. These data sets varied widely in the number of years covered, the
information collected, and the completeness of the records. Of the 11 states that report both
disturbed acreage and project duration (Arizona, California, Delaware, Minnesota, New York,
Oklahoma, South Carolina, South Dakota, Tennessee, Vermont, Virginia) only California, New
York, and South Carolina categorized project by construction type (i.e., residential,
transportation). That information was necessary for developing distributions of project size and
duration for each of the activity sectors.
Table C-1. State NOI data assessed for the C&D rulemaking
State
Disturbed area
Project duration
Record count
Alabama*
No
No
13,276
Alaska
No
Yes
1,233
Arkansas
No
No
1,958
Arizona*
Yes
Yes
13,591
California*
Yes
Yes
20,756
Colorado*
No
No
4,057
Connecticut*
No
No
4,019
Delaware
Yes
Yes
2,904
Georgia
Yes
No
21,914
Florida*
No
No
22,662
Idaho*
No
Yes
2,203
Illinois
No
Yes
4,457
Indiana
Yes
No
9,825
Louisiana*
No
No
1,441
Maine*
No
No
1,410
C-1

-------
State
Disturbed area
Project duration
Record count
Maryland
Yes
No
12,542
Massachusetts
No
Yes
2,826
Michigan*
No
No
13,016
Minnesota*
Yes
Yes
21,191
Mississippi*
No
No
1,624
Nebraska*
Yes
No
1,232
New Hampshire
No
Yes
1,957
New Jersey
No
No
42
New Mexico
No
Yes
3,673
New York*
Yes
Yes
6,972
North Dakota*
No
No
2,151
Ohio
No
Yes
9,181
Oklahoma*
Yes
Yes
1,965
South Carolina
Yes
Yes
12,576
South Dakota*
Yes
Yes
1,381
Tennessee
Yes
Yes
8,851
Vermont*
Yes
Yes
1,225
Virginia
Yes
Yes
9,032
Washington*
No
No
1,800
West Virginia
Yes
No
1,219
Wisconsin*
Yes
No
11,190
Wyoming*
No
No
2,099
* These states also had some additional NOI records that were covered under the EPA General
Permit. However, none of the NOI information gathered under the EPA Construction General
Permit reports disturbed acreage.
Because state NOI data were not gathered for the purpose of deriving distributions, EPA had to
scrutinize the records to ensure that the distributions would reflect accurate and comparable data
sets. EPA inspected the data and removed records that it considered inappropriate for developing
size and duration distributions. For each of the three states, EPA performed the following steps:
•	Removed all records where the project began before 2003. EPA did this to ensure that
the data represented years in which projects less than 5 but greater than 1 acre were
covered. Before 2003, some states did not require projects less than 5 acres to file for
permit coverage.
•	Removed records that were blank for either disturbed acreage, construction start date,
or construction end date.
•	Removed records with duration values that were one day or shorter, or that were
longer than 4 years because those were considered to have a high potential for
containing an erroneous start or end date.
•	Removed all records where disturbed acres was less than one acre.
•	Several records in California appeared to have excessively high values for disturbed
acreage. The project addresses for those records were checked using satellite imagery.
If the record appeared to reflect the square footage for the site rather than acreage, the
value was adjusted accordingly. If EPA could not determine what the correct acreage
was for the site, the record was removed. Approximately 11 of the California records
were either adjusted or removed.
C-2

-------
• Removed files that had a high potential for being a duplicate record because they
shared project names, owner names, addresses, disturbed acreage, and activity dates
with another record.
To reflect differences in regional development patterns, geography, and demographic trends,
EPA used the distribution from each state to represent the region of the country in which it is
located. New York is considered representative of the Northeastern and Great Lake states,
California is considered representative of the West Coast and the Southwestern states, while
South Carolina is considered representative of the Southeastern states. That left several of the
Midwestern and Rocky Mountain States unrepresented. To develop a representative distribution
for those states, EPA performed the same six steps as performed on the other three state data
sets. The Agency then reviewed each of the remaining 1,159 records and assigned each project
into either residential, nonresidential, or transportation according to the project name and
description of activity fields. That allowed EPA to develop a fourth regional distribution. Table
C-2 identifies which states are assigned to each of the regionally representative project
distributions.
Table C-2. Assignment of regionally representative project distributions
according to NOI data from four states
States with regionally
States assigned regionally representative project
representative NOI data

distribution
California
Arizona
Oregon

Colorado
Texas

Nevada
Utah

New Mexico
Washington
New York
Connecticut
Michigan

Delaware
Minnesota

Dist. of Columbia
New Hampshire

Hawaii
New Jersey

Illinois
Ohio

Indiana
Pennsylvania

Maine
Rhode Island

Maryland
Vermont

Massachusetts
Wisconsin
South Carolina
Arkansas
Missouri

Florida
North Carolina

Georgia
Oklahoma

Kentucky
Tennessee

Louisiana
Virginia

Mississippi
West Virginia
South Dakota
Alaska
Montana

Idaho
Nebraska

Iowa
North Dakota

Kansas
Wyoming
Reference
USEPA (U.S. Environmental Protection Agency). 2009. Economic Analysis for Final Effluent
Guidelines and Standards for the Construction and Development Category (EPA-821-R-09-
011). U.S. Environmental Protection Agency, Office of Water, Washington, DC.
C-3

-------
Appendix D
Precipitation Data Representative of Major
U.S. Metropolitan Areas

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
Overview
The U.S. Environmental Protection Agency (EPA) used precipitation data to estimate costs and
pollutant load reductions for regulatory options. EPA developed a series of regional pollutant
load models using data from 11 indicator cities for the loadings analysis. These indicator cities
are shown in Table D-l. For the costing analysis, EPA used rainfall data for one indicator city in
each state. EPA used the same 11 indicator cities for the states described in Table D-l. For the
remaining states, a major urban area was chosen as the indicator; which in most cases was the
capital city. Precipitation data was acquired for each city using the National Oceanic and
Atmospheric Administration (NOAA) National Weather Service (NWS) Precipitation Frequency
Data Server (PFDS). The Hydrometeorological Design Studies Center (HDSC) within the Office
of Hydrologic Development of the NWS is in an ongoing process of updating its precipitation
frequency estimates, which are available in NOAA Atlas 14 format. At the time of this writing,
only a portion of the United States had been updated into this format. Atlas 14 supercedes
precipitation frequency estimates contained in previous NWS publications. The updates are
based on more recent and extended data sets, currently accepted statistical approaches, and
improved spatial interpolation and mapping techniques. A complete list of NWS publications is
listed in Table D-2. The rainfall analysis data is DCN 43095 and an index of spatial data analyses
conducted for the proposed rule is DCN 43097 the Administrative Record.
Table D-1. EPA Region indicators
EPA Region
Indicator city
1
Manchester, NH
2
Albany, NY
3
Washington, DC, VA, and MD
4
Atlanta, GA
5
Chicago, IL—IN
6
Dallas, Fort Worth, and Arlington, TX
7
Kansas City, MO and KS
8
Denver and Aurora, CO
9
Las Vegas, NV
10
Boise City, ID, and Seattle, WA
D-1

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
Table D-2. Current NWS precipitation frequency publications
Location
5 min-60 min
1 hr-24 hr
2 day-10 day
Arizona, Nevada, New Mexico, Utah, and
Southeast California
NOAA Atlas 14
(2003)
NOAA Atlas 14
(2003)
NOAA Atlas 14
(2003)
Remainder of the Western United States
Arkell & Richards
(1986)
Frederick & Miller
(1979)
NOAA Atlas 2
(1973)
Tech. Paper 49
(1964)
Delaware; Illinois; Indiana; Kentucky; Maryland;
New Jersey; North Carolina; Ohio; Pennsylvania;
South Carolina; Tennessee; Virginia; West
Virginia; and Washington, DC
NOAA Atlas 14,
Volume 2 (June
2004)
NOAA Atlas 14,
Volume 2
(June 2004)
NOAA Atlas 14,
Volume 2
(June 2004)
Remainder of the Eastern United States
Tech. Memo 35
(1977)
Tech. Paper 40
(1961)
Tech. Paper 49
(1964)
Hawaii
Tech. Paper 43
(1962)
Tech. Paper 43
(1962)
Tech. Paper
51(1965)
Alaska
Tech. Paper 47
(1963)
Tech. Paper 47
(1963)
Tech. Paper 52
(1965)
Puerto Rico
NOAA Atlas 14,
Volume 3
NOAA Atlas 14,
Volume 3
NOAA Atlas 14,
Volume 3
NOAA Atlas 14 contains precipitation frequency estimates with associated confidence limits for
the United States for 5-minute through 60-day durations at average recurrence intervals of 1 year
through 1,000 year. The estimates are based on the analysis of annual maximum series and then
converted to partial duration series results. Figure D-l shows an example of the Atlas 14
interface.
D-2

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
NOAA's National Weather Service
Hydrometeorological Design Studies
Precipitation Frequency Data Server
Help ]
VIRGINIA
[ Reset |
1.	DATA DESCRIPTION:
Data type: | Precipitation depth v
Units: English v
Time series type: Partial duration v
2.	SELECT LOCATION:
Select site from list:
[ Select observing site
[ Submit site |
Enter location:
Latitude (decimal degrees): |lat
Longitude (decimal degrees): (jon	]
[ Submit location
Click on map to select location information:
Latitude: [38,653
Longitude: [-75.194
Elevation (feet): [ 13	|
Projection: Geographic: Elevation data based on Digital Terrain Elevation Date (DTEDj.
Figure D-1. Example of PFDS Atlas 14-Virginia.
The Atlas 14 interface allows the user to choose from various data parameters, such as data type
(precipitation depth or precipitation intensity); units (English or Metric); time series type (partial
duration or annual maximum); and the weather station location. The rainfall data results used in
EPA's analysis are shown in Table D-3.
For the states not currently updated by NOAA Atlas 14, the rainfall-frequency values for
selected durations were estimated using a series of maps presented in the older NWS
publications. The current modeling effort focused on the 2-year 24-hour, 10-year 24-hour,
25-year 24-hour, and 10-year 6-hour precipitation data. Therefore, the data for the remainder of
the Western United States were estimated by using NOAA Atlas 2, Precipitation Frequency
Atlas of the Western United States (1973), which are generalized maps presented for 6- and
24-hour point precipitation for the return periods of 2, 5, 10, 25, 50, and 100 years. Atlas 2 is
published in separate volumes for each of the states. Similarly, the maps presented in the
corresponding Technical Paper were used for the remainder of the Eastern United States and
Hawaii. (Alaska was not included in this analysis because EPA lacked sufficient data on the
annual amount of construction activity occurring in Alaska). Examples of an Atlas 2 map and a
map from a Technical Paper are shown in Figures D-6 and D-7, respectively.
Precipitation frequency results not generated by Atlas 14 for the remaining states (i.e., using
Atlas 2 or Technical Paper maps) are presented in Table D-4. The rainfall depths in Table D-4
D-3

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
were estimated by identifying the target city on the Atlas 2 or Technical Paper map and linearly
approximating the rainfall value. For example, if a city fell between a depth of 4.5 and 5 inches
and the city was approximately 20 percent of the map distance from the 5-inch line, a rainfall
depth of 4.9 inches was estimated. Note that the maps provided data for depth only. Intensity
estimates were calculated by dividing the duration (e.g., 6- or 24-hour) by the depth.
Additionally, Atlas 2 depths were converted from tenths of an inch to inches.
The above data were used in modeling state basin size requirements. New York and Wisconsin
specified alternate basin size storm events (10-year, 24-hours and 1-year, 24-hours, respectively).
Therefore, a depth of 4.4 inches for a 10-year 24-hour event in Albany, New York, and a depth
of 2.5 inches for a 1-year 24-hour event in Madison, Wisconsin were also estimated.
For use in estimating the annual volume of runoff produced, the PRISM Group analysis and
mapping services, developed by the Oregon State University, was used to obtain annual
precipitation data for all indicator cities and gauge locations. The PRISM data sets were
developed through projects funded partly by the U.S. Department of Agriculture (USD A)
Natural Resources Conservation Service, USD A Forest Service, NOAA Office of Global
Programs, and others. PRISM Group is responsible for nearly all major climate mapping efforts
at the federal level in the United States. Some examples of recent and current projects include the
following:
•	Climate Atlas of the United States, for the National Climatic Data Center
•	Precipitation and temperature maps for all 50 U.S. states and possessions, for USDA
Natural Resources Conservation Service
•	103 years of monthly temperature and precipitation maps for the lower 48 states, for
NASA/NOAA Office of Global Programs
The PRISM Model is a knowledge-based system that uses point measurements of precipitation,
temperature, and other climate elements to produce continuous, digital coverages. Figure D-2
provides an example of the PRISM Data Explorer interface.
D-4

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
I i mate
Location:
Month:
PRISM
V 	 	
If Show PRISM background | Jan 3 12007 H
Gridcell Time-Series Analysis
<• English
WARNING: This application is for analyzing	CKck map to set gridcell coordinates
timeseries for single grid-point data ONL"i. If Use the Map Server Identify i tool to query visible map layers,
you wish to retrieve larger regions, please use the
gridded data which is available for FTP from
here. Any abuse of this system such as writing of
robots and programs that automatically query
many gridcells IS PROHIBITED and will result
in denial of access.
Please contact us if you need assistance.
Map Tools
C ©J
c QJ
r w
r +
r i
Map Size:
| Small ""l
Query Refresh
Precipitation (in.)
0 IHO-6-0.8 ~2.^—2.8 ~ 6-8
1 no.8-1.2 D2.8-3.2 §8-12
1-0.2 OI.2-1.6	~ 12-16
1 EI1.6-2.0 [J4-5 ~ 16-20
~2.0-2.4 B5-6 ~ 20+
|Annual »¦"]
Valid period
1895 to Mar-OS
Figure D-2. Example of PRISM Interface.
The PRISM interface allows users to choose from various parameters such as months (January
through December, all months, and annual); start and stop years (1895 to current); and units
(English or Metric). The PRISM-required inputs are latitude and longitude points for all indicator
cities and gauge locations. Results were compiled of annual precipitation totals for the years of
1895 to 2007 from which a determination was made for the annual average for each indicator
city in each state (presented in Table D-5). The latitude and longitude point inputs for the PRISM
Gridcell analysis were obtained from NOAA Atlas 14 weather station locations [e.g., Phoenix
WSFO AP, AZ (02-6481)] where possible. For the states not currently updated by NOAA Atlas
14, the U.S. Geological Survey (USGS) Geographic Names Information System (GNIS) was
used to obtain latitude and longitude points.
Figure D-3 provides an example of the USGS interface.
D-5

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
Geographic Names Information System (GNIS>
USGS
Query Form For The United States And Its Territories
Feature Name jl.lontavfrierv
r E*act Mafcfrt r	Vanants
-labama
csmml	3
Feature SO: {
satuf* Class' | pc-pulated Place *1 Definitio
Elevation": \	y| |	
^ Feet r
bend Query I Erase Query
2,025.645 features in tt>e GNIS
Important Links
Click any field title for help in entering query data.
Click Frequently Asked Questions (FAQs) tab for important information.
"Elevations are from the Nationai Elevation Dataset
GNIS Home
U.S. Board on Geographic Names
I jf U.S. Geological Suwey
12201 Sunrise Valle* Dri*e, Reston, VA20192, USA
anis manaqef@usqs.gov
form updated: March 19 2008
USGS Privacy Pulic. and Disclaimers
Figure D-3. Example of USGS GNIS Interface.
The indicator city and the state were input into this interface and then Populated Place under the
Feature Class field was selected for obtaining the latitude and longitude points. Once Send Query
is selected, the results are displayed in a table format as shown in the Figure D-4 example. The
user can then click the desired Feature Name in the list for a Detailed Report as shown in the
example in Figure D-5.
Feature Query Results








Clich the feature name for details and to access mao sereices
Click arty column name to sort the list ascending A or descending ~






	
L • •
i.iC T-'E--. ~zLL*
!00N|0861800W
[ AL

239
1031
G4-SEP-1S80
E:i! 1
l:: 3:cF:3;o

:;ii osi
-L

220
...
0"-OEC-2003 |
i.!ni: Hiii
r Fis«

:v.i ¦
1 AL
T^:":S.3a
157
-
01-DEC-2003 [
i.i :¦-¦ ==! . : •• • :

': < • . :

AL	
¦7-: r": Tlrr1
387
-
'22-NOV-1BS6 |
N:~- ' ' •
r
!K. J_J

| AL

161
-
01-DEC-2003 |
Cr-: G-:re
P: fir-.76

¦: I! i
r«r

518
-
"cToiciooi-

Figure D-4. Example of USGS GNIS Query Results.
D-6

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
Feature Detail Report
Feature ttt
165344
Name
Montgomery
Z-.hii
Populated Place
Desari ption:
Capital of State of Alabama.
Citation;
Collected during Phase! data compilation {1975-1981), primarily from U.S. Qeological Survey
1:24,{>0O-scafe topographic maps for 1:251C, Puerto Rico 120K), various edition elates, amtf from U.&
Board on Geographic Names files.
Entry Data:
(M-Sep-1380
Elevation
23W3
{fti'mf:
Census Code
Class Code GSACodr OPM Cocte
51000
€1 2130 2130
Board on Geographic Names Decision a
Feature Maine
Decision Year Authority Decision Type
Montgomery
1931 Board Derision Official
Counties

Sequence County Cod* Stale Coda Country
1 Montgomefy 101 Alabama 01 US
Coordinates (One point per USGS topographic map containing the feature,. NAD83}
Scquenc* LalitafcfDECJ LongitudepEC) LatitafcfDMSJ l®ngita§eCDM5} Map Nan*
1 32,3868052 -08.2999889 322200N OOB1000W Montflorneiy South
2 32 3834714 -0B.2S33019 322300H OSB1700W Monlflomeiy Motth
Figure D-5. Example of USGS GNIS Query Detail Report.
The Sequence 1 latitude (DEC) and longitude (DEC) data coordinates from the USGS GNIS
query results were used for use in the PRISM model for each indicator city.
D-7

-------
Table D-3. NOAA Atlas 14 precipitation frequency results
D
I
CO
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: ILLINOIS
Station: CHICAGO OHARE WSO ARP
Lon (dd): -87.9142
Lat (dd): 41.9861
Elev (feet): 66
Date/time: Thu Jan 31 08:44:02 EST 2008
Freq (yr)
1
5-min
0.39
10-
min
0.6
15-
min
0.73
30-
min
0.97
60-
min
1.19
120-
min
1.39
3-hr
1.49
6-hr
1.78
12-hr
2.05
24-hr
2.34
2-day
2.7
4-day
3.08
7-day
3.58
10-day
4.05
20-day
5.53
30-day
6.88
45-day
8.64
60-day
10.42
2
0.46
0.71
0.87
1.17
1.43
1.68
1.8
2.15
2.47
2.85
3.26
3.7
4.27
4.81
6.54
8.1
10.15
12.22
5
0.54
0.84
1.03
1.41
1.77
2.1
2.27
2.75
3.13
3.64
4.11
4.55
5.16
5.77
7.71
9.41
11.61
13.94
10
0.61
0.95
1.17
1.62
2.06
2.47
2.68
3.3
3.74
4.29
4.81
5.26
5.88
6.57
8.63
10.39
12.68
15.2
25
0.7
1.08
1.33
1.88
2.44
2.94
3.21
4.05
4.57
5.25
5.83
6.28
6.9
7.69
9.88
11.65
14
16.78
50
0.78
1.18
1.46
2.09
2.76
3.35
3.67
4.73
5.32
6.07
6.68
7.13
7.73
8.61
10.85
12.6
14.98
17.93
100
0.85
1.28
1.59
2.3
3.08
3.77
4.13
5.46
6.11
6.96
7.6
8.05
8.61
9.59
11.85
13.52
15.9
19.01
200
0.93
1.39
1.73
2.52
3.43
4.2
4.63
6.26
6.98
7.93
8.61
9.04
9.54
10.63
12.86
14.44
16.77
20.03
500
1.04
1.53
1.9
2.82
3.9
4.81
5.31
7.42
8.24
9.38
10.08
10.56
10.92
12.12
14.25
15.61
17.87
21.3
1000
1.13
1.64
2.05
3.08
4.32
5.33
5.91
8.47
9.38
10.62
11.32
11.86
12.19
13.38
15.34
16.49
18.66
22.21







Precipitation Intensity Estimates (in/hr)







2
5.47
4.27
3.48
2.33
1.43
0.84
0.6
0.36
0.21
0.12
0.07
0.04
0.03
0.02
0.01
0.01
0.01
0.01
5
6.48
5.03
4.12
2.82
1.77
1.05
0.76
0.46
0.26
0.15
0.09
0.05
0.03
0.02
0.02
0.01
0.01
0.01
10
7.36
5.68
4.66
3.24
2.06
1.23
0.89
0.55
0.31
0.18
0.1
0.05
0.03
0.03
0.02
0.01
0.01
0.01
25
8.45
6.46
5.32
3.75
2.44
1.47
1.07
0.68
0.38
0.22
0.12
0.07
0.04
0.03
0.02
0.02
0.01
0.01
50
9.36
7.09
5.85
4.18
2.76
1.68
1.22
0.79
0.44
0.25
0.14
0.07
0.05
0.04
0.02
0.02
0.01
0.01
100
10.24
7.7
6.38
4.61
3.08
1.88
1.38
0.91
0.51
0.29
0.16
0.08
0.05
0.04
0.02
0.02
0.01
0.01
200
11.18
8.35
6.92
5.05
3.43
2.1
1.54
1.04
0.58
0.33
0.18
0.09
0.06
0.04
0.03
0.02
0.02
0.01
500
12.46
9.16
7.62
5.64
3.9
2.4
1.77
1.24
0.68
0.39
0.21
0.11
0.07
0
0
0
0
0
1000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Date/time: Thu Jan 31 08:47:43 EST 2008

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: NEW MEXICO
Station: SANTA FE
Lon (dd): 105.9
Lat (dd): 35.6833
Elev (feet): 7582
Date/time: Thu Jan 31 10:56:42 EST 2008


10-
15-
30-
60-
Freq (yr)
5-min
min
min
min
min
1
0.2
0.3
0.38
0.51
0.63
2
0.26
0.39
0.49
0.66
0.81
5
0.34
0.52
0.65
0.87
1.08
10
0.41
0.62
0.77
1.04
1.28
25
0.5
0.76
0.94
1.26
1.56
50
0.56
0.86
1.06
1.43
1.77
100
0.64
0.97
1.2
1.62
2
200
0.71
1.08
1.34
1.8
2.23
500
0.81
1.23
1.52
2.05
2.54
1000
0.89
1.35
1.67
2.25
2.79
2
3.1
2.36
1.95
1.31
0.81
5
4.13
3.14
2.6
1.75
1.08
10
4.91
3.73
3.08
2.08
1.28
25
5.96
4.54
3.75
2.52
1.56
50
6.76
5.15
4.25
2.86
1.77
100
7.64
5.81
4.81
3.24
2
200
8.51
6.47
5.35
3.6
2.23
500
9.7
7.38
6.1
4.11
2.54
1000
0
0
0
0
0
Date/time: Thu Jan 31 10:57:41 EST 2008
120-







10-
20-
30-
45-
60-
min
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
0.76
0.82
0.96
1.09
1.24
1.4
1.62
1.92
2.18
2.91
3.56
4.46
5.16
0.97
1.04
1.2
1.37
1.54
1.75
2.02
2.39
2.71
3.62
4.42
5.53
6.41
1.28
1.34
1.52
1.71
1.92
2.16
2.5
2.94
3.34
4.41
5.35
6.62
7.68
1.52
1.59
1.77
1.98
2.22
2.5
2.88
3.36
3.84
5.01
6.04
7.41
8.59
1.84
1.93
2.13
2.36
2.62
2.94
3.39
3.92
4.5
5.78
6.92
8.39
9.7
2.1
2.19
2.4
2.64
2.93
3.29
3.78
4.36
5
6.36
7.55
9.07
10.48
2.38
2.47
2.68
2.94
3.26
3.64
4.18
4.79
5.51
6.91
8.17
9.72
11.21
2.67
2.77
2.98
3.23
3.58
3.99
4.58
5.22
6.02
7.45
8.75
10.31
11.88
3.07
3.18
3.38
3.63
4.02
4.46
5.12
5.79
6.69
8.14
9.47
11.04
12.69
3.38
3.51
3.7
3.95
4.35
4.83
5.54
6.21
7.21
8.64
9.99
11.54
13.25

Precipitation Intensity Estimates (in/hr)







0.48
0.35
0.2
0.11
0.06
0.04
0.02
0.01
0.01
0.01
0.01
0.01
0
0.64
0.45
0.25
0.14
0.08
0.05
0.03
0.02
0.01
0.01
0.01
0.01
0.01
0.76
0.53
0.3
0.16
0.09
0.05
0.03
0.02
0.02
0.01
0.01
0.01
0.01
0.92
0.64
0.36
0.2
0.11
0.06
0.04
0.02
0.02
0.01
0.01
0.01
0.01
1.05
0.73
0.4
0.22
0.12
0.07
0.04
0.03
0.02
0.01
0.01
0.01
0.01
1.19
0.82
0.45
0.24
0.14
0.08
0.04
0.03
0.02
0.01
0.01
0.01
0.01
1.34
0.92
0.5
0.27
0.15
0.08
0.05
0.03
0.03
0.02
0.01
0.01
0.01
1.54
1.06
0.56
0.3
0.17
0.09
0.05
0.03
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: ARIZONA
Station: PHOENIX WSFO AP
Lon (dd): -111.99
Lat (dd): 33.4431
Elev (feet): 1148
Date/time: Thu Jan 31 11:18:08 EST 2008


10-
15-
30-
60-
Freq (yr)
5-min
min
min
min
min
1
0.17
0.27
0.33
0.44
0.55
2
0.23
0.35
0.43
0.58
0.72
5
0.31
0.48
0.59
0.79
0.98
10
0.38
0.57
0.71
0.96
1.19
25
0.46
0.7
0.87
1.18
1.46
50
0.53
0.81
1
1.35
1.67
100
0.6
0.91
1.13
1.52
1.88
200
0.67
1.02
1.26
1.7
2.1
500
0.76
1.16
1.44
1.94
2.4
1000
0.83
1.27
1.57
2.12
2.62
2
2.74
2.08
1.72
1.16
0.72
5
3.76
2.86
2.36
1.59
0.98
10
4.52
3.44
2.85
1.92
1.19
25
5.56
4.23
3.5
2.35
1.46
50
6.37
4.85
4.01
2.7
1.67
100
7.19
5.47
4.52
3.04
1.88
200
8.03
6.11
5.05
3.4
2.1
500
9.14
6.96
5.75
3.87
2.4
1000
0
0
0
0
0
Date/time: Thu Jan 31 11:19:49 EST 2008
120-







10-
20-
30-
45-
60-
min
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
0.63
0.67
0.81
0.91
1.1
1.21
1.32
1.45
1.58
1.93
2.25
2.61
2.89
0.81
0.86
1.03
1.16
1.4
1.55
1.68
1.85
2.02
2.48
2.89
3.35
3.72
1.09
1.14
1.33
1.48
1.81
2.03
2.21
2.43
2.65
3.26
3.8
4.41
4.88
1.31
1.36
1.57
1.73
2.14
2.42
2.64
2.9
3.16
3.86
4.49
5.19
5.72
1.6
1.67
1.9
2.06
2.59
2.96
3.25
3.57
3.88
4.65
5.42
6.21
6.82
1.83
1.92
2.16
2.32
2.95
3.38
3.73
4.1
4.45
5.26
6.12
6.97
7.62
2.07
2.18
2.43
2.59
3.33
3.83
4.26
4.67
5.05
5.88
6.85
7.74
8.42
2.3
2.45
2.7
2.85
3.71
4.31
4.81
5.26
5.69
6.51
7.58
8.49
9.2
2.62
2.83
3.08
3.22
4.24
4.96
5.59
6.11
6.57
7.35
8.56
9.49
10.21
2.87
3.13
3.37
3.5
4.66
5.49
6.22
6.79
7.29
8
9.31
10.23
10.96

Precipitation Intensity Estimates (in/hr)







0.4
0.29
0.17
0.1
0.06
0.03
0.02
0.01
0.01
0.01
0
0
0
0.55
0.38
0.22
0.12
0.08
0.04
0.02
0.01
0.01
0.01
0.01
0
0
0.66
0.45
0.26
0.14
0.09
0.05
0.03
0.02
0.01
0.01
0.01
0
0
0.8
0.56
0.32
0.17
0.11
0.06
0.03
0.02
0.02
0.01
0.01
0.01
0
0.92
0.64
0.36
0.19
0.12
0.07
0.04
0.02
0.02
0.01
0.01
0.01
0.01
1.03
0.73
0.41
0.21
0.14
0.08
0.04
0.03
0.02
0.01
0.01
0.01
0.01
1.15
0.82
0.45
0.24
0.15
0.09
0.05
0.03
0.02
0.01
0.01
0.01
0.01
1.31
0.94
0.51
0.27
0.18
0.1
0.06
0.04
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: UTAH
Station: SALT LAKE CITY NWSFO
Lon (dd): -111.955
Lat (dd): 40.7725
Elev (feet): 4235
Date/time: Thu Jan 31 14:22:26 EST 2008


10-
15-
30-
60-
Freq (yr)
5-min
min
min
min
min
1
0.12
0.18
0.23
0.3
0.38
2
0.15
0.23
0.29
0.39
0.48
5
0.21
0.32
0.39
0.53
0.65
10
0.26
0.39
0.48
0.65
0.81
25
0.34
0.52
0.65
0.87
1.08
50
0.42
0.65
0.8
1.08
1.33
100
0.52
0.79
0.98
1.32
1.63
200
0.63
0.96
1.19
1.6
1.99
500
0.82
1.24
1.54
2.07
2.57
1000
0.99
1.5
1.86
2.51
3.11
2
1.81
1.38
1.14
0.77
0.48
5
2.48
1.89
1.56
1.05
0.65
10
3.08
2.35
1.94
1.31
0.81
25
4.12
3.13
2.59
1.74
1.08
50
5.09
3.87
3.2
2.15
1.33
100
6.22
4.73
3.91
2.63
1.63
200
7.57
5.77
4.76
3.21
1.99
500
9.79
7.45
6.16
4.15
2.57
1000
0
0
0
0
0
Date/time: Thu Jan 31 14:23:39 EST 2008
120-







10-
20-
30-
45-
60-
min
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
0.5
0.58
0.75
0.94
1.14
1.29
1.5
1.74
1.96
2.56
3.1
3.84
4.56
0.61
0.71
0.92
1.14
1.4
1.58
1.84
2.13
2.4
3.15
3.8
4.7
5.59
0.8
0.89
1.1
1.37
1.67
1.89
2.2
2.55
2.86
3.73
4.47
5.51
6.55
0.97
1.05
1.27
1.57
1.9
2.15
2.51
2.9
3.23
4.17
4.99
6.15
7.3
1.25
1.31
1.53
1.88
2.21
2.49
2.94
3.38
3.72
4.74
5.65
6.97
8.24
1.51
1.55
1.75
2.13
2.45
2.76
3.27
3.75
4.08
5.15
6.13
7.56
8.92
1.83
1.84
2
2.41
2.69
3.03
3.61
4.13
4.44
5.54
6.59
8.13
9.57
2.2
2.21
2.28
2.7
2.95
3.3
3.96
4.51
4.8
5.92
7.02
8.67
10.18
2.81
2.82
2.88
3.14
3.29
3.66
4.43
5.03
5.26
6.38
7.57
9.35
10.93
3.37
3.38
3.44
3.5
3.54
3.94
4.8
5.42
5.6
6.71
7.96
9.82
11.46

Precipitation Intensity Estimates (in/hr)







0.31
0.24
0.15
0.09
0.06
0.03
0.02
0.01
0.01
0.01
0.01
0
0
0.4
0.3
0.18
0.11
0.07
0.04
0.02
0.02
0.01
0.01
0.01
0.01
0
0.48
0.35
0.21
0.13
0.08
0.04
0.03
0.02
0.01
0.01
0.01
0.01
0.01
0.63
0.44
0.26
0.16
0.09
0.05
0.03
0.02
0.02
0.01
0.01
0.01
0.01
0.76
0.52
0.29
0.18
0.1
0.06
0.03
0.02
0.02
0.01
0.01
0.01
0.01
0.91
0.61
0.33
0.2
0.11
0.06
0.04
0.02
0.02
0.01
0.01
0.01
0.01
1.1
0.74
0.38
0.22
0.12
0.07
0.04
0.03
0.02
0.01
0.01
0.01
0.01
1.41
0.94
0.48
0.26
0.14
0.08
0.05
0.03
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: NEVADA
Station: LAS VEGAS WSO AIRPORT
Lon (dd): -115.167
Lat (dd): 36.0833
Elev (feet): 2152
Date/time: Thu Jan 31 14:25:16 EST 2008


10-
15-
30-
60-
120-







10-
20-
30-
45-
60-
Freq (yr)
5-min
min
min
min
min
min
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1
0.12
0.17
0.22
0.29
0.36
0.45
0.5
0.61
0.7
0.77
0.8
0.88
0.96
1.04
1.18
1.34
1.46
1.61
2
0.15
0.23
0.29
0.39
0.48
0.59
0.65
0.79
0.92
1
1.05
1.16
1.27
1.37
1.58
1.8
1.97
2.19
5
0.22
0.33
0.41
0.55
0.68
0.82
0.89
1.07
1.25
1.37
1.42
1.58
1.73
1.86
2.18
2.54
2.83
3.2
10
0.27
0.41
0.51
0.69
0.85
1
1.07
1.29
1.48
1.62
1.68
1.87
2.04
2.19
2.58
3.05
3.42
3.91
25
0.35
0.53
0.66
0.88
1.09
1.26
1.34
1.58
1.8
1.96
2.02
2.24
2.43
2.59
3.07
3.69
4.19
4.84
50
0.41
0.62
0.77
1.04
1.29
1.48
1.54
1.82
2.03
2.2
2.27
2.52
2.71
2.88
3.42
4.16
4.76
5.55
100
0.48
0.73
0.91
1.23
1.52
1.72
1.77
2.07
2.27
2.46
2.51
2.78
2.97
3.15
3.76
4.61
5.33
6.26
200
0.56
0.85
1.05
1.42
1.76
1.98
2.01
2.33
2.5
2.7
2.75
3.04
3.22
3.4
4.09
5.05
5.89
6.97
500
0.67
1.02
1.27
1.71
2.12
2.36
2.39
2.69
2.83
3.03
3.05
3.38
3.55
3.73
4.49
5.61
6.6
7.91
1000
0.77
1.17
1.45
1.96
2.42
2.67
2.69
3
3.07
3.27
3.28
3.63
3.79
3.97
4.77
6.01
7.13
8.61
Precipitation Intensity Estimates (in/hr)
2
1.82
1.39
1.15
0.77
0.48
0.29
0.22
0.13
0.08
0.04
0.02
0.01
0.01
0.01
0
0
0
0
5
2.59
1.97
1.63
1.1
0.68
0.41
0.3
0.18
0.1
0.06
0.03
0.02
0.01
0.01
0
0
0
0
10
3.24
2.47
2.04
1.37
0.85
0.5
0.36
0.22
0.12
0.07
0.04
0.02
0.01
0.01
0.01
0
0
0
25
4.16
3.17
2.62
1.76
1.09
0.63
0.45
0.26
0.15
0.08
0.04
0.02
0.01
0.01
0.01
0.01
0
0
50
4.91
3.74
3.09
2.08
1.29
0.74
0.51
0.3
0.17
0.09
0.05
0.03
0.02
0.01
0.01
0.01
0
0
100
5.78
4.4
3.64
2.45
1.52
0.86
0.59
0.35
0.19
0.1
0.05
0.03
0.02
0.01
0.01
0.01
0
0
200
6.7
5.1
4.22
2.84
1.76
0.99
0.67
0.39
0.21
0.11
0.06
0.03
0.02
0.01
0.01
0.01
0.01
0
500
8.08
6.14
5.08
3.42
2.12
1.18
0.8
0.45
0.23
0.13
0.06
0.04
0.02
0
0
0
0
0
1000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Date/time: Thu Jan 31 14:33:29 EST 2008

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: INDIANA
Station: INDIANAPOLIS WSFO AP
Lon (dd): -86.2789
Lat (dd): 39.7317
Elev (feet): 780
Date/time: Thu Jan 31 14:35:02 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.38
0.6
0.73
0.97
1.18
1.39
2
0.46
0.71
0.87
1.17
1.43
1.68
5
0.55
0.85
1.04
1.43
1.79
2.11
10
0.62
0.95
1.17
1.63
2.07
2.45
25
0.71
1.08
1.34
1.89
2.46
2.94
50
0.78
1.19
1.47
2.1
2.76
3.33
100
0.85
1.28
1.59
2.3
3.08
3.75
200
0.93
1.38
1.72
2.51
3.4
4.19
500
1.02
1.5
1.88
2.78
3.85
4.81
1000
1.1
1.6
2
2.99
4.2
5.31
2
5.48
4.28
3.49
2.33
1.43
0.84
5
6.56
5.1
4.18
2.86
1.79
1.05
10
7.42
5.72
4.69
3.26
2.07
1.23
25
8.51
6.51
5.36
3.79
2.46
1.47
50
9.38
7.11
5.87
4.19
2.76
1.67
100
10.22
7.7
6.38
4.6
3.08
1.88
200
11.1
8.29
6.87
5.01
3.4
2.1
500
12.29
9.03
7.51
5.57
3.85
2.41
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 14:36:24 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.47
1.74
2.07
2.46
2.87
3.26
3.85
4.39
5.99
7.39
9.35
11.2
1.78
2.11
2.49
2.95
3.43
3.89
4.58
5.21
7.09
8.71
10.97
13.12
2.24
2.67
3.1
3.62
4.19
4.69
5.49
6.23
8.36
10.13
12.64
15.02
2.61
3.12
3.6
4.13
4.76
5.31
6.22
7.03
9.35
11.22
13.92
16.49
3.14
3.77
4.29
4.83
5.54
6.15
7.2
8.12
10.65
12.65
15.56
18.36
3.58
4.31
4.86
5.38
6.15
6.81
7.98
8.98
11.66
13.74
16.79
19.75
4.05
4.89
5.46
5.94
6.76
7.47
8.76
9.84
12.66
14.81
17.97
21.09
4.55
5.51
6.08
6.5
7.39
8.13
9.56
10.72
13.65
15.85
19.1
22.37
5.26
6.41
6.97
7.27
8.22
9.02
10.63
11.89
14.95
17.2
20.54
23.98
5.84
7.15
7.68
7.86
8.86
9.71
11.46
12.8
15.94
18.21
21.59
25.15
'recipitation Intensity Estimates (in/hr)







0.59
0.35
0.21
0.12
0.07
0.04
0.03
0.02
0.01
0.01
0.01
0.01
0.75
0.45
0.26
0.15
0.09
0.05
0.03
0.03
0.02
0.01
0.01
0.01
0.87
0.52
0.3
0.17
0.1
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.05
0.63
0.36
0.2
0.12
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.19
0.72
0.4
0.22
0.13
0.07
0.05
0.04
0.02
0.02
0.02
0.01
1.35
0.82
0.45
0.25
0.14
0.08
0.05
0.04
0.03
0.02
0.02
0.01
1.51
0.92
0.5
0.27
0.15
0.08
0.06
0.04
0.03
0.02
0.02
0.02
1.75
1.07
0.58
0.3
0.17
0.09
0.06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: OHIO
Station: COLUMBUS WSO AIRPORT
Lon (dd): -82.8808
Lat (dd): 39.9914
Elev (feet): 820
Date/time: Thu Jan 31 13:06:58 EST 2008


10-
15-
30-
60-
Freq (yr)
5-min
min
min
min
min
1
0.35
0.55
0.67
0.89
1.09
2
0.42
0.66
0.8
1.07
1.32
5
0.5
0.78
0.96
1.32
1.65
10
0.57
0.88
1.08
1.5
1.91
25
0.65
1
1.23
1.74
2.25
50
0.71
1.08
1.34
1.92
2.53
100
0.78
1.17
1.46
2.1
2.81
200
0.84
1.26
1.56
2.28
3.1
500
0.93
1.36
1.7
2.52
3.48
1000
0.99
1.44
1.8
2.7
3.79
2
5.05
3.94
3.21
2.15
1.32
5
6.05
4.7
3.85
2.63
1.65
10
6.83
5.27
4.32
3
1.91
25
7.82
5.98
4.92
3.48
2.25
50
8.58
6.51
5.37
3.84
2.53
100
9.34
7.03
5.82
4.2
2.81
200
10.1
7.54
6.25
4.56
3.1
500
11.12
8.18
6.8
5.04
3.48
1000
0
0
0
0
0
Date/time: Thu Jan 31 13:07:44 EST 2008
120-







10-
20-
30-
45-
60-
min
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.27
1.35
1.61
1.89
2.19
2.53
2.9
3.48
3.97
5.52
6.92
8.81
10.64
1.54
1.63
1.94
2.26
2.62
3.03
3.45
4.14
4.71
6.51
8.14
10.35
12.46
1.93
2.04
2.41
2.8
3.23
3.7
4.19
5.01
5.63
7.65
9.45
11.88
14.21
2.24
2.37
2.8
3.25
3.73
4.25
4.79
5.7
6.37
8.54
10.44
13.04
15.52
2.67
2.84
3.36
3.9
4.44
5.03
5.62
6.68
7.38
9.71
11.72
14.49
17.17
3.02
3.21
3.83
4.44
5.03
5.66
6.29
7.46
8.18
10.62
12.69
15.55
18.38
3.39
3.61
4.33
5.03
5.64
6.33
6.98
8.27
8.99
11.51
13.61
16.55
19.5
3.77
4.03
4.86
5.65
6.3
7.02
7.7
9.11
9.83
12.4
14.5
17.5
20.57
4.3
4.62
5.62
6.55
7.23
8
8.68
10.28
10.96
13.56
15.63
18.67
21.87
4.73
5.09
6.25
7.29
7.98
8.78
9.46
11.2
11.85
14.41
16.45
19.5
22.78

Precipitation Intensity Estimates (in/hr)







0.77
0.54
0.32
0.19
0.11
0.06
0.04
0.02
0.02
0.01
0.01
0.01
0.01
0.96
0.68
0.4
0.23
0.13
0.08
0.04
0.03
0.02
0.02
0.01
0.01
0.01
1.12
0.79
0.47
0.27
0.16
0.09
0.05
0.03
0.03
0.02
0.01
0.01
0.01
1.34
0.94
0.56
0.32
0.19
0.1
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.51
1.07
0.64
0.37
0.21
0.12
0.07
0.04
0.03
0.02
0.02
0.01
0.01
1.69
1.2
0.72
0.42
0.24
0.13
0.07
0.05
0.04
0.02
0.02
0.02
0.01
1.88
1.34
0.81
0.47
0.26
0.15
0.08
0.05
0.04
0.03
0.02
0.02
0.01
2.15
1.54
0.94
0.54
0.3
0.17
0.09
0.06
0.05
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: PENNSYLVANIA
Station: PHILADELPHIA WSOAP
Lon (dd): -75.2311
Lat (dd): 39.8683
Elev (feet): 6
Date/time: Thu Jan 31 14:50:28 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.35
0.56
0.69
0.95
1.19
1.43
2
0.41
0.66
0.83
1.15
1.44
1.73
5
0.49
0.78
0.98
1.4
1.79
2.17
10
0.54
0.86
1.08
1.57
2.05
2.49
25
0.6
0.95
1.21
1.79
2.38
2.93
50
0.64
1.02
1.29
1.94
2.63
3.26
100
0.68
1.08
1.37
2.09
2.88
3.6
200
0.72
1.14
1.43
2.23
3.13
3.93
500
0.76
1.2
1.51
2.4
3.44
4.38
1000
0.79
1.24
1.56
2.52
3.68
4.72
2
4.97
3.97
3.32
2.3
1.44
0.87
5
5.83
4.67
3.94
2.8
1.79
1.08
10
6.43
5.15
4.34
3.14
2.05
1.25
25
7.18
5.72
4.83
3.58
2.38
1.46
50
7.68
6.11
5.16
3.89
2.63
1.63
100
8.17
6.49
5.47
4.19
2.88
1.8
200
8.59
6.81
5.73
4.46
3.13
1.97
500
9.08
7.19
6.03
4.8
3.44
2.19
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 14:51:05 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.56
1.93
2.34
2.68
3.07
3.44
3.98
4.46
6.01
7.49
9.49
11.32
1.89
2.33
2.82
3.23
3.71
4.15
4.78
5.34
7.13
8.83
11.15
13.27
2.37
2.91
3.54
4.08
4.7
5.22
5.94
6.54
8.53
10.34
12.86
15.18
2.73
3.38
4.13
4.8
5.51
6.1
6.89
7.5
9.63
11.51
14.15
16.59
3.22
4.03
5.01
5.85
6.68
7.36
8.27
8.87
11.14
13.07
15.79
18.37
3.61
4.56
5.75
6.74
7.66
8.4
9.42
9.97
12.32
14.26
17.02
19.67
4.01
5.11
6.55
7.7
8.71
9.52
10.64
11.12
13.52
15.44
18.18
20.88
4.4
5.69
7.42
8.76
9.85
10.72
11.95
12.32
14.74
16.61
19.29
22.01
4.94
6.51
8.68
10.3
11.48
12.45
13.82
14.05
16.38
18.13
20.67
23.39
5.36
7.16
9.73
11.6
12.84
13.87
15.36
15.48
17.64
19.26
21.66
24.36
'recipitation Intensity Estimates (in/hr)







0.63
0.39
0.23
0.13
0.08
0.04
0.03
0.02
0.01
0.01
0.01
0.01
0.79
0.49
0.29
0.17
0.1
0.05
0.04
0.03
0.02
0.01
0.01
0.01
0.91
0.56
0.34
0.2
0.11
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.07
0.67
0.42
0.24
0.14
0.08
0.05
0.04
0.02
0.02
0.01
0.01
1.2
0.76
0.48
0.28
0.16
0.09
0.06
0.04
0.03
0.02
0.02
0.01
1.33
0.85
0.54
0.32
0.18
0.1
0.06
0.05
0.03
0.02
0.02
0.01
1.47
0.95
0.62
0.36
0.21
0.11
0.07
0.05
0.03
0.02
0.02
0.02
1.65
1.09
0.72
0.43
0.24
0.13
0.08
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: KENTUCKY
Station: FRANKFORT LOCK 4
Lon (dd): -84.8817
Lat (dd): 38.235
Elev (feet): 600
Date/time: Thu Jan 31 14:52:10 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.38
0.59
0.72
0.96
1.17
1.37
2
0.45
0.7
0.86
1.15
1.41
1.65
5
0.52
0.82
1.01
1.38
1.74
2.04
10
0.59
0.91
1.12
1.57
2
2.36
25
0.67
1.03
1.27
1.8
2.35
2.8
50
0.73
1.11
1.38
1.98
2.62
3.15
100
0.79
1.2
1.49
2.16
2.9
3.53
200
0.85
1.28
1.59
2.34
3.19
3.92
500
0.94
1.38
1.73
2.58
3.59
4.47
1000
1
1.46
1.83
2.76
3.9
4.92
2
5.35
4.19
3.42
2.3
1.41
0.82
5
6.29
4.91
4.02
2.77
1.74
1.02
10
7.06
5.47
4.5
3.14
2
1.18
25
8.02
6.16
5.08
3.61
2.35
1.4
50
8.77
6.68
5.52
3.97
2.62
1.58
100
9.49
7.18
5.95
4.33
2.9
1.76
200
10.21
7.67
6.38
4.68
3.19
1.96
500
11.23
8.3
6.93
5.16
3.59
2.24
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 14:52:44 EST 2008
3-hr
6-hr
12-hr
24-hr
2-day
1.47
1.8
2.12
2.51
2.96
1.77
2.16
2.54
3
3.55
2.19
2.67
3.13
3.73
4.38
2.54
3.09
3.62
4.34
5.06
3.03
3.7
4.32
5.23
6.04
3.43
4.2
4.89
5.98
6.84
3.86
4.74
5.5
6.79
7.69
4.31
5.31
6.16
7.67
8.6
4.96
6.14
7.09
8.95
9.89
5.49
6.82
7.86
10.01
10.95
'recipitation Intensity Estimates (in/hr)
0.59
0.36
0.21
0.13
0.07
0.73
0.45
0.26
0.16
0.09
0.84
0.52
0.3
0.18
0.11
1.01
0.62
0.36
0.22
0.13
1.14
0.7
0.41
0.25
0.14
1.28
0.79
0.46
0.28
0.16
1.44
0.89
0.51
0.32
0.18
1.65
1.03
0.59
0.37
0.21
0
0
0
0
0


10-
20-
30-
45-
60-
4-day
7-day
day
day
day
day
day
3.34
3.98
4.48
6.17
7.7
9.75
11.59
4
4.73
5.34
7.31
9.08
11.45
13.59
4.89
5.76
6.48
8.7
10.64
13.17
15.5
5.62
6.61
7.42
9.81
11.85
14.46
16.93
6.63
7.82
8.76
11.31
13.46
16.07
18.71
7.44
8.82
9.86
12.49
14.69
17.24
20.01
8.29
9.88
11
13.69
15.9
18.35
21.2
9.17
11
12.22
14.9
17.1
19.38
22.31
10.39
12.59
13.92
16.53
18.66
20.64
23.65
11.35
13.87
15.29
17.79
19.82
21.53
24.59
0.04
0.03
0.02
0.02
0.01
0.01
0.01
0.05
0.03
0.03
0.02
0.01
0.01
0.01
0.06
0.04
0.03
0.02
0.02
0.01
0.01
0.07
0.05
0.04
0.02
0.02
0.01
0.01
0.08
0.05
0.04
0.03
0.02
0.02
0.01
0.09
0.06
0.05
0.03
0.02
0.02
0.01
0.1
0.07
0.05
0.03
0.02
0.02
0.02
0.11
0.07
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: WEST VIRGINIA
Station: CHARLESTON WSFO AP
Lon (dd): -81.5914
Lat (dd): 38.3794
Elev (feet): 744
Date/time: Thu Jan 31 14:53:54 EST 2008


10-
15-
30-
60-
Freq (yr)
5-min
min
min
min
min
1
0.34
0.53
0.65
0.85
1.04
2
0.4
0.63
0.77
1.03
1.26
5
0.48
0.75
0.92
1.26
1.58
10
0.54
0.83
1.03
1.43
1.81
25
0.62
0.94
1.17
1.65
2.13
50
0.67
1.02
1.26
1.8
2.38
100
0.72
1.09
1.36
1.96
2.62
200
0.78
1.16
1.44
2.11
2.86
500
0.84
1.24
1.55
2.29
3.17
1000
0.89
1.3
1.62
2.43
3.42
2
4.82
3.77
3.07
2.06
1.26
5
5.78
4.49
3.68
2.52
1.58
10
6.49
5.01
4.11
2.85
1.81
25
7.39
5.66
4.66
3.29
2.13
50
8.08
6.12
5.05
3.61
2.38
100
8.7
6.55
5.42
3.92
2.62
200
9.34
6.97
5.78
4.21
2.86
500
10.13
7.45
6.19
4.59
3.17
1000
0
0
0
0
0
Date/time: Thu Jan 31 14:54:26 EST 2008
120-







10-
20-
30-
45-
60-
min
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.21
1.27
1.5
1.77
2.16
2.58
2.99
3.6
4.15
5.8
7.3
9.32
11.24
1.46
1.53
1.8
2.11
2.56
3.06
3.54
4.25
4.89
6.79
8.53
10.85
13.04
1.82
1.91
2.22
2.58
3.1
3.66
4.21
4.97
5.67
7.77
9.63
12.13
14.46
2.1
2.2
2.56
2.96
3.55
4.15
4.73
5.54
6.27
8.5
10.46
13.08
15.51
2.48
2.61
3.03
3.5
4.16
4.82
5.44
6.27
7.03
9.42
11.48
14.23
16.76
2.78
2.93
3.41
3.95
4.65
5.35
5.98
6.82
7.61
10.09
12.22
15.05
17.64
3.08
3.26
3.81
4.41
5.17
5.89
6.53
7.37
8.15
10.71
12.9
15.78
18.42
3.38
3.59
4.22
4.89
5.7
6.45
7.08
7.9
8.68
11.3
13.52
16.44
19.11
3.8
4.05
4.78
5.57
6.44
7.21
7.8
8.58
9.34
12.02
14.26
17.22
19.91
4.12
4.41
5.23
6.11
7.02
7.79
8.36
9.08
9.83
12.52
14.77
17.74
20.45

Precipitation Intensity Estimates (in/hr)







0.73
0.51
0.3
0.18
0.11
0.06
0.04
0.03
0.02
0.01
0.01
0.01
0.01
0.91
0.64
0.37
0.21
0.13
0.08
0.04
0.03
0.02
0.02
0.01
0.01
0.01
1.05
0.73
0.43
0.25
0.15
0.09
0.05
0.03
0.03
0.02
0.01
0.01
0.01
1.24
0.87
0.51
0.29
0.17
0.1
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.39
0.98
0.57
0.33
0.19
0.11
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.54
1.08
0.64
0.37
0.22
0.12
0.07
0.04
0.03
0.02
0.02
0.01
0.01
1.69
1.2
0.7
0.41
0.24
0.13
0.07
0.05
0.04
0.02
0.02
0.02
0.01
1.9
1.35
0.8
0.46
0.27
0.15
0.08
0.05
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: VIRGINIA
Station: WASHINGTON REAGAN AP
Lon (dd): -77.0342
Lat (dd): 38.865
Elev (feet): 22
Date/time: Tue Feb 5 10:31:30 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.36
0.57
0.71
0.97
1.21
1.41
2
0.43
0.68
0.86
1.18
1.49
1.71
5
0.51
0.81
1.03
1.46
1.87
2.17
10
0.57
0.91
1.15
1.66
2.16
2.52
25
0.64
1.02
1.3
1.92
2.56
3.02
50
0.7
1.11
1.41
2.12
2.87
3.43
100
0.75
1.2
1.51
2.31
3.19
3.85
200
0.81
1.28
1.61
2.51
3.52
4.3
500
0.87
1.38
1.74
2.77
3.97
4.93
1000
0.93
1.46
1.83
2.97
4.33
5.44
2
5.11
4.09
3.43
2.37
1.49
0.86
5
6.08
4.87
4.11
2.92
1.87
1.08
10
6.79
5.43
4.58
3.32
2.16
1.26
25
7.7
6.13
5.18
3.84
2.56
1.51
50
8.36
6.67
5.62
4.24
2.87
1.71
100
9.04
7.18
6.05
4.63
3.19
1.93
200
9.67
7.66
6.45
5.02
3.52
2.15
500
10.49
8.29
6.96
5.54
3.97
2.46
1000
0
0
0
0
0
0
Date/time: Tue Feb 5 10:32:29 EST 2008
3-hr
6-hr
12-hr
24-hr
2-day
1.5
1.84
2.22
2.57
2.99
1.83
2.23
2.67
3.11
3.62
2.32
2.81
3.4
4
4.64
2.71
3.29
4.02
4.78
5.51
3.26
4
4.97
5.98
6.83
3.72
4.61
5.8
7.04
7.98
4.21
5.26
6.72
8.24
9.25
4.72
5.97
7.75
9.61
10.68
5.45
7.01
9.32
11.71
12.83
6.06
7.89
10.67
13.55
14.68
'recipitation Intensity Estimates (in/hr)
0.61
0.37
0.22
0.13
0.08
0.77
0.47
0.28
0.17
0.1
0.9
0.55
0.33
0.2
0.11
1.09
0.67
0.41
0.25
0.14
1.24
0.77
0.48
0.29
0.17
1.4
0.88
0.56
0.34
0.19
1.57
1
0.64
0.4
0.22
1.82
1.17
0.77
0.49
0.27
0
0
0
0
0


10-
20-
30-
45-
60-
4-day
7-day
day
day
day
day
day
3.33
3.85
4.41
5.95
7.32
9.19
10.94
4.02
4.64
5.29
7.07
8.66
10.84
12.86
5.14
5.86
6.61
8.55
10.3
12.67
14.86
6.1
6.91
7.71
9.74
11.62
14.08
16.37
7.55
8.48
9.31
11.41
13.43
15.93
18.32
8.8
9.83
10.65
12.76
14.88
17.35
19.77
10.2
11.32
12.11
14.16
16.36
18.73
21.16
11.75
12.96
13.67
15.61
17.88
20.09
22.48
14.08
15.42
15.98
17.63
19.94
21.84
24.16
16.08
17.51
17.89
19.22
21.55
23.14
25.37
0.04
0.03
0.02
0.01
0.01
0.01
0.01
0.05
0.03
0.03
0.02
0.01
0.01
0.01
0.06
0.04
0.03
0.02
0.02
0.01
0.01
0.08
0.05
0.04
0.02
0.02
0.01
0.01
0.09
0.06
0.04
0.03
0.02
0.02
0.01
0.11
0.07
0.05
0.03
0.02
0.02
0.01
0.12
0.08
0.06
0.03
0.02
0.02
0.02
0.15
0.09
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: MARYLAND
Station: BALTIMORE WSO ARPT
Lon (dd): -76.6839
Lat (dd): 39.1722
Elev (feet): 147
Date/time: Thu Jan 31 14:47:48 EST 2008


10-
15-
30-
60-
Freq (yr)
5-min
min
min
min
min
1
0.34
0.55
0.69
0.94
1.17
2
0.41
0.66
0.83
1.14
1.43
5
0.49
0.78
0.99
1.41
1.8
10
0.55
0.87
1.1
1.6
2.08
25
0.62
0.98
1.25
1.85
2.46
50
0.67
1.07
1.35
2.03
2.76
100
0.72
1.15
1.45
2.22
3.06
200
0.77
1.22
1.54
2.4
3.37
500
0.83
1.32
1.66
2.64
3.79
1000
0.88
1.39
1.74
2.82
4.11
2
4.93
3.94
3.3
2.28
1.43
5
5.87
4.7
3.96
2.82
1.8
10
6.55
5.24
4.42
3.2
2.08
25
7.4
5.9
4.99
3.69
2.46
50
8.04
6.4
5.4
4.07
2.76
100
8.66
6.88
5.8
4.44
3.06
200
9.25
7.33
6.17
4.8
3.37
500
10
7.9
6.63
5.28
3.79
1000
0
0
0
0
0
Date/time: Thu Jan 31 14:48:21 EST 2008
120-







10-
20-
30-
45-
60-
min
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.4
1.51
1.86
2.25
2.61
3.03
3.35
3.89
4.43
5.99
7.39
9.31
11.09
1.7
1.83
2.25
2.72
3.16
3.66
4.05
4.68
5.33
7.12
8.75
10.98
13.05
2.16
2.33
2.84
3.46
4.06
4.7
5.18
5.92
6.65
8.61
10.4
12.83
15.07
2.51
2.71
3.32
4.09
4.85
5.59
6.15
6.98
7.75
9.81
11.73
14.26
16.61
3
3.27
4.04
5.06
6.08
6.92
7.61
8.56
9.36
11.5
13.57
16.14
18.58
3.4
3.72
4.66
5.91
7.16
8.09
8.87
9.92
10.71
12.86
15.04
17.56
20.05
3.82
4.2
5.32
6.86
8.38
9.39
10.27
11.42
12.16
14.26
16.53
18.96
21.45
4.25
4.71
6.04
7.92
9.76
10.84
11.84
13.08
13.73
15.73
18.05
20.33
22.79
4.87
5.45
7.09
9.53
11.89
13.02
14.19
15.55
16.01
17.76
20.14
22.11
24.49
5.37
6.04
7.98
10.93
13.76
14.9
16.2
17.66
17.93
19.36
21.75
23.43
25.71

Precipitation Intensity Estimates (in/hr)







0.85
0.61
0.38
0.23
0.13
0.08
0.04
0.03
0.02
0.01
0.01
0.01
0.01
1.08
0.78
0.47
0.29
0.17
0.1
0.05
0.04
0.03
0.02
0.01
0.01
0.01
1.25
0.9
0.55
0.34
0.2
0.12
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.5
1.09
0.68
0.42
0.25
0.14
0.08
0.05
0.04
0.02
0.02
0.01
0.01
1.7
1.24
0.78
0.49
0.3
0.17
0.09
0.06
0.04
0.03
0.02
0.02
0.01
1.91
1.4
0.89
0.57
0.35
0.2
0.11
0.07
0.05
0.03
0.02
0.02
0.01
2.13
1.57
1.01
0.66
0.41
0.23
0.12
0.08
0.06
0.03
0.03
0.02
0.02
2.44
1.81
1.18
0.79
0.5
0.27
0.15
0.09
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: DELAWARE
Station: DOVER
Lon (dd): -75.5167
Lat (dd): 39.2583
Elev (feet): 0
Date/time: Thu Jan 31 14:45:28 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.35
0.56
0.7
0.96
1.2
1.46
2
0.42
0.67
0.84
1.16
1.46
1.76
5
0.49
0.78
0.99
1.41
1.8
2.2
10
0.55
0.88
1.11
1.61
2.09
2.57
25
0.62
0.98
1.25
1.85
2.46
3.05
50
0.67
1.07
1.35
2.04
2.76
3.44
100
0.72
1.15
1.45
2.22
3.05
3.84
200
0.77
1.21
1.53
2.38
3.35
4.25
500
0.82
1.3
1.64
2.6
3.73
4.79
1000
0.87
1.37
1.72
2.78
4.05
5.25
2
5.02
4.01
3.36
2.32
1.46
0.88
5
5.87
4.7
3.96
2.82
1.8
1.1
10
6.59
5.26
4.44
3.22
2.09
1.29
25
7.4
5.9
4.99
3.69
2.46
1.52
50
8.04
6.4
5.4
4.07
2.76
1.72
100
8.65
6.87
5.79
4.43
3.05
1.92
200
9.19
7.28
6.13
4.77
3.35
2.12
500
9.85
7.79
6.54
5.2
3.73
2.4
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 14:46:04 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.58
1.95
2.36
2.68
3.09
3.42
3.98
4.48
6.05
7.49
9.51
11.39
1.92
2.35
2.83
3.26
3.76
4.16
4.8
5.38
7.2
8.87
11.22
13.41
2.39
2.92
3.54
4.24
4.89
5.35
6.08
6.71
8.71
10.57
13.14
15.51
2.81
3.44
4.21
5.08
5.85
6.37
7.17
7.8
9.93
11.91
14.61
17.08
3.35
4.14
5.15
6.36
7.32
7.88
8.77
9.38
11.63
13.75
16.54
19.07
3.81
4.75
6
7.49
8.59
9.18
10.14
10.71
13
15.2
18.01
20.54
4.27
5.39
6.91
8.75
10.01
10.62
11.64
12.12
14.43
16.67
19.44
21.93
4.76
6.08
7.92
10.19
11.62
12.23
13.29
13.73
15.9
18.18
20.84
23.26
5.42
7.04
9.38
12.37
14.04
14.63
15.74
16.12
17.96
20.2
22.65
24.93
5.98
7.88
10.71
14.27
16.15
16.69
17.81
18.17
19.6
21.78
24
26.12
recipitation Intensity Estimates (in/hr)







0.64
0.39
0.23
0.14
0.08
0.04
0.03
0.02
0.01
0.01
0.01
0.01
0.8
0.49
0.29
0.18
0.1
0.06
0.04
0.03
0.02
0.01
0.01
0.01
0.93
0.57
0.35
0.21
0.12
0.07
0.04
0.03
0.02
0.02
0.01
0.01
1.11
0.69
0.43
0.27
0.15
0.08
0.05
0.04
0.02
0.02
0.02
0.01
1.27
0.79
0.5
0.31
0.18
0.1
0.06
0.04
0.03
0.02
0.02
0.01
1.42
0.9
0.57
0.36
0.21
0.11
0.07
0.05
0.03
0.02
0.02
0.02
1.58
1.02
0.66
0.42
0.24
0.13
0.08
0.06
0.03
0.03
0.02
0.02
1.8
1.18
0.78
0.52
0.29
0.15
0.09
0.06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: NEW JERSEY
Station: HIGHTSTOWN 2 W
Lon (dd): -74.5642
Lat (dd): 40.265
Elev (feet): 98
Date/time: Thu Jan 31 14:43:06 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.34
0.54
0.68
0.93
1.16
1.41
2
0.41
0.65
0.81
1.12
1.41
1.72
5
0.48
0.77
0.97
1.38
1.77
2.18
10
0.54
0.86
1.09
1.57
2.05
2.54
25
0.61
0.96
1.22
1.81
2.41
3.03
50
0.66
1.04
1.32
1.99
2.7
3.42
100
0.71
1.12
1.42
2.17
2.99
3.83
200
0.75
1.19
1.51
2.35
3.29
4.25
500
0.81
1.28
1.62
2.57
3.69
4.84
1000
0.86
1.35
1.69
2.74
4
5.31
2
4.86
3.89
3.26
2.25
1.41
0.86
5
5.77
4.62
3.9
2.77
1.77
1.09
10
6.44
5.15
4.34
3.15
2.05
1.27
25
7.27
5.79
4.89
3.62
2.41
1.51
50
7.87
6.27
5.29
3.98
2.7
1.71
100
8.47
6.73
5.67
4.34
2.99
1.92
200
9.04
7.16
6.02
4.69
3.29
2.13
500
9.74
7.7
6.46
5.14
3.69
2.42
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 14:43:54 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.55
1.97
2.39
2.73
3.16
3.55
4.16
4.73
6.4
7.96
10.16
12.18
1.89
2.39
2.89
3.31
3.84
4.3
5
5.67
7.61
9.41
11.96
14.3
2.41
3.03
3.68
4.26
4.94
5.46
6.26
6.99
9.13
11.09
13.88
16.41
2.8
3.55
4.36
5.07
5.87
6.44
7.31
8.06
10.35
12.39
15.34
17.98
3.36
4.3
5.37
6.3
7.25
7.86
8.83
9.6
12.02
14.14
17.22
19.97
3.82
4.93
6.24
7.37
8.44
9.06
10.12
10.87
13.34
15.49
18.63
21.42
4.3
5.6
7.2
8.57
9.75
10.37
11.5
12.21
14.69
16.83
19.99
22.79
4.79
6.33
8.26
9.9
11.2
11.79
12.99
13.63
16.07
18.17
21.31
24.08
5.49
7.38
9.86
11.93
13.38
13.88
15.18
15.66
17.96
19.94
22.98
25.68
6.05
8.26
11.22
13.69
15.24
15.65
17
17.39
19.43
21.28
24.22
26.83
recipitation Intensity Estimates (in/hr)







0.63
0.4
0.24
0.14
0.08
0.04
0.03
0.02
0.02
0.01
0.01
0.01
0.8
0.51
0.31
0.18
0.1
0.06
0.04
0.03
0.02
0.02
0.01
0.01
0.93
0.59
0.36
0.21
0.12
0.07
0.04
0.03
0.02
0.02
0.01
0.01
1.12
0.72
0.45
0.26
0.15
0.08
0.05
0.04
0.03
0.02
0.02
0.01
1.27
0.82
0.52
0.31
0.18
0.09
0.06
0.05
0.03
0.02
0.02
0.01
1.43
0.94
0.6
0.36
0.2
0.11
0.07
0.05
0.03
0.02
0.02
0.02
1.6
1.06
0.69
0.41
0.23
0.12
0.08
0.06
0.03
0.03
0.02
0.02
1.83
1.23
0.82
0.5
0.28
0.14
0.09
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: TENNESSEE
Station: NASHVILLE WSO AIRPORT
Lon (dd): -86.6764
Lat (dd): 36.1253
Elev (feet): 498
Date/time: Thu Jan 31 14:41:00 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.38
0.61
0.76
1.04
1.3
1.54
2
0.45
0.71
0.9
1.24
1.55
1.83
5
0.51
0.82
1.04
1.48
1.9
2.23
10
0.57
0.91
1.15
1.67
2.17
2.54
25
0.64
1.01
1.28
1.9
2.54
2.97
50
0.69
1.09
1.39
2.09
2.83
3.31
100
0.74
1.17
1.48
2.27
3.12
3.67
200
0.78
1.24
1.57
2.44
3.42
4.03
500
0.84
1.33
1.68
2.67
3.83
4.52
1000
0.89
1.4
1.75
2.84
4.15
4.91
2
5.35
4.28
3.59
2.48
1.55
0.91
5
6.17
4.94
4.16
2.96
1.9
1.11
10
6.82
5.45
4.6
3.33
2.17
1.27
25
7.63
6.08
5.14
3.81
2.54
1.48
50
8.24
6.56
5.54
4.17
2.83
1.66
100
8.83
7.02
5.92
4.53
3.12
1.83
200
9.41
7.46
6.27
4.88
3.42
2.01
500
10.12
8
6.71
5.34
3.83
2.26
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 14:41:55 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.67
2
2.37
2.83
3.37
3.76
4.56
5.24
7.08
8.72
10.86
13.07
1.99
2.38
2.82
3.37
4.03
4.48
5.44
6.24
8.39
10.28
12.76
15.34
2.41
2.88
3.42
4.11
4.92
5.45
6.62
7.51
9.9
11.99
14.69
17.56
2.76
3.31
3.92
4.7
5.65
6.23
7.58
8.53
11.05
13.3
16.16
19.2
3.23
3.9
4.62
5.53
6.69
7.29
8.93
9.91
12.56
15.02
18.05
21.25
3.61
4.38
5.19
6.2
7.53
8.15
10.01
11.01
13.7
16.32
19.46
22.76
4.01
4.88
5.79
6.89
8.41
9.04
11.15
12.13
14.82
17.6
20.81
24.16
4.41
5.41
6.41
7.61
9.34
9.94
12.34
13.26
15.91
18.85
22.11
25.46
4.97
6.15
7.28
8.6
10.63
11.17
13.99
14.8
17.31
20.46
23.75
27.05
5.41
6.73
7.96
9.37
11.65
12.14
15.31
15.99
18.35
21.66
24.93
28.17
'ecipitation Intensity Estimates (in/hr)







0.66
0.4
0.23
0.14
0.08
0.05
0.03
0.03
0.02
0.01
0.01
0.01
0.8
0.48
0.28
0.17
0.1
0.06
0.04
0.03
0.02
0.02
0.01
0.01
0.92
0.55
0.33
0.2
0.12
0.06
0.05
0.04
0.02
0.02
0.01
0.01
1.08
0.65
0.38
0.23
0.14
0.08
0.05
0.04
0.03
0.02
0.02
0.01
1.2
0.73
0.43
0.26
0.16
0.08
0.06
0.05
0.03
0.02
0.02
0.02
1.33
0.82
0.48
0.29
0.18
0.09
0.07
0.05
0.03
0.02
0.02
0.02
1.47
0.9
0.53
0.32
0.19
0.1
0.07
0.06
0.03
0.03
0.02
0.02
1.66
1.03
0.6
0.36
0.22
0.12
0.08
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: NORTH CAROLINA
Station: CHARLOTTE WSO ARPT
Lon (dd): -80.9542
Lat (dd): 35.2225
Elev (feet): 728
Date/time: Thu Jan 31 14:38:42 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.4
0.63
0.79
1.09
1.35
1.57
2
0.47
0.75
0.94
1.3
1.64
1.9
5
0.55
0.88
1.11
1.57
2.02
2.36
10
0.6
0.96
1.22
1.77
2.3
2.71
25
0.67
1.06
1.35
1.99
2.65
3.16
50
0.71
1.13
1.43
2.16
2.93
3.51
100
0.75
1.19
1.51
2.31
3.19
3.85
200
0.79
1.25
1.57
2.45
3.44
4.19
500
0.83
1.31
1.65
2.62
3.76
4.64
1000
0.86
1.35
1.69
2.74
4
4.97
2
5.64
4.51
3.78
2.61
1.64
0.95
5
6.55
5.25
4.43
3.14
2.02
1.18
10
7.22
5.78
4.87
3.53
2.3
1.35
25
7.99
6.37
5.38
3.99
2.65
1.58
50
8.53
6.8
5.74
4.32
2.93
1.75
100
9.02
7.16
6.04
4.62
3.19
1.93
200
9.44
7.49
6.3
4.9
3.44
2.1
500
9.94
7.86
6.59
5.25
3.76
2.32
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 14:39:36 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.68
2.03
2.41
2.77
3.24
3.63
4.17
4.78
6.41
7.92
9.96
11.84
2.02
2.45
2.91
3.34
3.9
4.36
4.97
5.69
7.57
9.31
11.66
13.82
2.52
3.06
3.64
4.19
4.86
5.37
6.04
6.83
8.93
10.82
13.31
15.61
2.91
3.54
4.23
4.86
5.62
6.18
6.9
7.73
10.01
11.99
14.59
16.99
3.44
4.19
5.04
5.76
6.64
7.28
8.08
8.94
11.46
13.53
16.24
18.77
3.85
4.7
5.69
6.48
7.45
8.15
9.01
9.89
12.59
14.72
17.5
20.11
4.27
5.23
6.36
7.22
8.27
9.04
9.97
10.85
13.73
15.9
18.71
21.4
4.7
5.77
7.06
7.97
9.11
9.95
10.95
11.82
14.89
17.07
19.89
22.65
5.29
6.52
8.04
9
10.26
11.2
12.28
13.12
16.44
18.62
21.43
24.27
5.75
7.11
8.82
9.8
11.15
12.16
13.31
14.13
17.64
19.8
22.59
25.49
'ecipitation Intensity Estimates (in/hr)







0.67
0.41
0.24
0.14
0.08
0.05
0.03
0.02
0.02
0.01
0.01
0.01
0.84
0.51
0.3
0.17
0.1
0.06
0.04
0.03
0.02
0.02
0.01
0.01
0.97
0.59
0.35
0.2
0.12
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.14
0.7
0.42
0.24
0.14
0.08
0.05
0.04
0.02
0.02
0.02
0.01
1.28
0.79
0.47
0.27
0.16
0.08
0.05
0.04
0.03
0.02
0.02
0.01
1.42
0.87
0.53
0.3
0.17
0.09
0.06
0.05
0.03
0.02
0.02
0.01
1.57
0.96
0.59
0.33
0.19
0.1
0.07
0.05
0.03
0.02
0.02
0.02
1.76
1.09
0.67
0.38
0.21
0.12
0.07
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: SOUTH CAROLINA
Station: COLUMBIA WSFO AP
Lon (dd): -81.1219
Lat (dd): 33.9456
Elev (feet): 209
Date/time: Thu Jan 31 13:53:59 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.46
0.73
0.91
1.25
1.55
1.79
2
0.53
0.85
1.06
1.47
1.84
2.14
5
0.61
0.97
1.23
1.75
2.24
2.61
10
0.68
1.08
1.37
1.99
2.59
3.05
25
0.76
1.21
1.53
2.27
3.03
3.62
50
0.83
1.32
1.67
2.51
3.4
4.11
100
0.89
1.41
1.79
2.74
3.77
4.62
200
0.95
1.51
1.9
2.96
4.15
5.16
500
1.03
1.62
2.04
3.25
4.67
5.91
1000
1.09
1.72
2.16
3.5
5.11
6.56
2
6.35
5.08
4.25
2.94
1.84
1.07
5
7.27
5.83
4.91
3.49
2.24
1.3
10
8.14
6.5
5.48
3.97
2.59
1.52
25
9.12
7.27
6.14
4.55
3.03
1.81
50
9.91
7.9
6.66
5.02
3.4
2.06
100
10.68
8.48
7.15
5.48
3.77
2.31
200
11.41
9.05
7.61
5.92
4.15
2.58
500
12.32
9.74
8.18
6.51
4.67
2.95
1000
0
0
0
0
0
0
Date/time: Thu Jan 31 13:54:39 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.89
2.24
2.61
3.02
3.55
4.02
4.68
5.32
7.17
8.84
10.98
13.14
2.25
2.67
3.12
3.62
4.25
4.82
5.57
6.31
8.47
10.41
12.88
15.41
2.77
3.27
3.84
4.52
5.28
5.93
6.79
7.61
10.02
12.15
14.83
17.57
3.25
3.85
4.54
5.28
6.13
6.84
7.79
8.68
11.25
13.51
16.34
19.21
3.91
4.64
5.51
6.39
7.35
8.13
9.2
10.18
12.93
15.32
18.32
21.27
4.49
5.35
6.39
7.33
8.37
9.19
10.36
11.39
14.25
16.7
19.8
22.79
5.1
6.1
7.33
8.35
9.47
10.31
11.58
12.66
15.59
18.06
21.24
24.22
5.76
6.92
8.36
9.46
10.66
11.5
12.87
13.99
16.96
19.41
22.64
25.56
6.71
8.09
9.87
11.1
12.35
13.21
14.73
15.89
18.8
21.2
24.46
27.22
7.55
9.14
11.23
12.47
13.75
14.59
16.25
17.43
20.23
22.54
25.8
28.4
recipitation Intensity Estimates (in/hr)







0.75
0.45
0.26
0.15
0.09
0.05
0.03
0.03
0.02
0.01
0.01
0.01
0.92
0.55
0.32
0.19
0.11
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.08
0.64
0.38
0.22
0.13
0.07
0.05
0.04
0.02
0.02
0.02
0.01
1.3
0.78
0.46
0.27
0.15
0.08
0.05
0.04
0.03
0.02
0.02
0.01
1.49
0.89
0.53
0.31
0.17
0.1
0.06
0.05
0.03
0.02
0.02
0.02
1.7
1.02
0.61
0.35
0.2
0.11
0.07
0.05
0.03
0.03
0.02
0.02
1.92
1.16
0.69
0.39
0.22
0.12
0.08
0.06
0.04
0.03
0.02
0.02
2.23
1.35
0.82
0.46
0.26
0.14
0.09
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: PUERTO RICO
Station: SAN JUAN WSFO
Lon (dd): -66
Lat (dd): 18.4333
Elev (feet): 6
Date/time: Tue Feb 5 09:38:04 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.37
0.51
0.66
1.05
1.56
1.87
2
0.46
0.63
0.81
1.29
1.91
2.34
5
0.52
0.7
0.9
1.45
2.15
2.7
10
0.55
0.76
0.97
1.56
2.31
2.94
25
0.6
0.82
1.05
1.69
2.5
3.24
50
0.63
0.86
1.11
1.78
2.64
3.45
100
0.66
0.9
1.16
1.86
2.76
3.64
200
0.69
0.94
1.21
1.93
2.87
3.83
500
0.72
0.98
1.26
2.02
3
4.06
1000
0.74
1.01
1.3
2.09
3.1
4.22
2
5.51
3.77
3.22
2.58
1.91
1.17
5
6.18
4.22
3.62
2.89
2.15
1.35
10
6.65
4.54
3.89
3.11
2.31
1.47
25
7.2
4.93
4.21
3.37
2.5
1.62
50
7.6
5.19
4.44
3.56
2.64
1.72
100
7.93
5.42
4.64
3.72
2.76
1.82
200
8.26
5.64
4.83
3.86
2.87
1.91
500
8.64
5.9
5.05
4.04
3
2.03
1000
0
0
0
0
0
0
Date/time: Tue Feb 5 09:39:39 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
2
2.48
2.8
3.27
4
4.44
5.12
5.75
7.86
9.93
12.31
14.92
2.51
3.15
3.62
4.26
5.21
5.75
6.59
7.35
9.92
12.45
15.38
18.51
2.95
3.89
4.7
5.66
6.9
7.61
8.56
9.32
12.13
14.86
18.14
21.49
3.25
4.42
5.54
6.76
8.26
9.11
10.14
10.9
13.89
16.74
20.34
23.87
3.61
5.08
6.68
8.29
10.13
11.2
12.33
13.05
16.24
19.19
23.2
26.97
3.88
5.58
7.58
9.5
11.63
12.88
14.08
14.76
18.07
21.07
25.38
29.34
4.13
6.06
8.49
10.75
13.17
14.6
15.88
16.5
19.91
22.91
27.53
31.64
4.37
6.54
9.44
12.04
14.79
16.42
17.75
18.28
21.78
24.78
29.72
33.98
4.68
7.17
10.73
13.83
17.03
18.96
20.35
20.73
24.27
27.21
32.6
37.03
4.9
7.64
11.74
15.24
18.8
20.97
22.4
22.65
26.17
29.06
34.77
39.34
recipitation Intensity Estimates (in/hr)







0.84
0.53
0.3
0.18
0.11
0.06
0.04
0.03
0.02
0.02
0.01
0.01
0.98
0.65
0.39
0.24
0.14
0.08
0.05
0.04
0.03
0.02
0.02
0.01
1.08
0.74
0.46
0.28
0.17
0.09
0.06
0.05
0.03
0.02
0.02
0.02
1.2
0.85
0.55
0.35
0.21
0.12
0.07
0.05
0.03
0.03
0.02
0.02
1.29
0.93
0.63
0.4
0.24
0.13
0.08
0.06
0.04
0.03
0.02
0.02
1.37
1.01
0.71
0.45
0.27
0.15
0.09
0.07
0.04
0.03
0.03
0.02
1.45
1.09
0.78
0.5
0.31
0.17
0.11
0.08
0.05
0.03
0.03
0.02
1.56
1.2
0.89
0.58
0.35
0.2
0.12
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------
Precipitation frequency estimates (depth/inches)
Point Estimates
Data series: Partial duration maxima
State: DISTRICT OF COLUMBIA
Station: NATIONAL ARBORETUM WASHINGTON DC
Lon (dd):-76.97
Lat (dd): 38.9133
Elev (feet): 78
Date/time: Tue Feb 5 09:44:27 EST 2008


10-
15-
30-
60-
120-
Freq (yr)
5-min
min
min
min
min
min
1
0.35
0.56
0.7
0.96
1.2
1.41
2
0.42
0.67
0.85
1.17
1.47
1.71
5
0.5
0.8
1.01
1.44
1.85
2.17
10
0.56
0.9
1.13
1.64
2.14
2.52
25
0.63
1.01
1.28
1.9
2.52
3.02
50
0.69
1.1
1.39
2.09
2.83
3.42
100
0.74
1.18
1.49
2.29
3.15
3.84
200
0.8
1.26
1.59
2.48
3.47
4.28
500
0.86
1.36
1.72
2.73
3.92
4.91
1000
0.91
1.44
1.8
2.92
4.26
5.42
2
5.05
4.04
3.38
2.34
1.47
0.86
5
6.01
4.81
4.06
2.88
1.85
1.08
10
6.72
5.37
4.53
3.28
2.14
1.26
25
7.61
6.06
5.12
3.79
2.52
1.51
50
8.27
6.58
5.56
4.18
2.83
1.71
100
8.92
7.09
5.97
4.57
3.15
1.92
200
9.54
7.56
6.36
4.95
3.47
2.14
500
10.33
8.17
6.86
5.46
3.92
2.46
1000
0
0
0
0
0
0
Date/time: Tue Feb 5 09:45:19 EST 2008







10-
20-
30-
45-
60-
3-hr
6-hr
12-hr
24-hr
2-day
4-day
7-day
day
day
day
day
day
1.51
1.85
2.25
2.61
3.03
3.37
3.91
4.46
6.02
7.42
9.32
11.09
1.83
2.25
2.71
3.16
3.67
4.07
4.7
5.35
7.16
8.77
10.99
13.04
2.33
2.84
3.44
4.06
4.7
5.2
5.94
6.68
8.65
10.43
12.84
15.07
2.72
3.32
4.08
4.85
5.59
6.18
7.01
7.8
9.86
11.77
14.27
16.6
3.27
4.04
5.04
6.07
6.93
7.64
8.6
9.42
11.55
13.62
16.15
18.58
3.73
4.65
5.89
7.15
8.09
8.91
9.96
10.78
12.92
15.09
17.58
20.05
4.22
5.32
6.83
8.37
9.39
10.32
11.48
12.25
14.33
16.59
18.99
21.46
4.73
6.03
7.87
9.76
10.84
11.9
13.15
13.84
15.8
18.12
20.37
22.81
5.47
7.09
9.47
11.9
13.03
14.26
15.65
16.16
17.85
20.23
22.16
24.52
6.07
7.98
10.86
13.78
14.91
16.3
17.79
18.1
19.47
21.87
23.48
25.76
cipitation Intensity Estimates (in/hr)







0.61
0.37
0.23
0.13
0.08
0.04
0.03
0.02
0.01
0.01
0.01
0.01
0.77
0.47
0.29
0.17
0.1
0.05
0.04
0.03
0.02
0.01
0.01
0.01
0.9
0.55
0.34
0.2
0.12
0.06
0.04
0.03
0.02
0.02
0.01
0.01
1.09
0.68
0.42
0.25
0.14
0.08
0.05
0.04
0.02
0.02
0.01
0.01
1.24
0.78
0.49
0.3
0.17
0.09
0.06
0.04
0.03
0.02
0.02
0.01
1.4
0.89
0.57
0.35
0.2
0.11
0.07
0.05
0.03
0.02
0.02
0.01
1.58
1.01
0.65
0.41
0.23
0.12
0.08
0.06
0.03
0.03
0.02
0.02
1.82
1.18
0.79
0.5
0.27
0.15
0.09
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

-------

IV! .! PI
MOGl I ANP
PLENTYWOOD
4CUT BANK
KOWNING
DUDYAUli
HAVRE \
I CHE
n
BROCKTON B^NVILUt
jV ^ GUtbtKtssA * \
SACO.
r;;
TAMPIC
woif eoiNt- 2. .
1 *- —
1
GLASGOW >WASHUA
¦CONRAD
BRADY

LAMBER1
CIRCLE. I
inPOAN
GLENDlVf
.CQHAGHT
LifertY-
i'-i-::
I i1 vV
UK,HOI-
colstRIP
mwDEttmE
ivcbtt iritE
§
/kT^V \ ALBION \ I
M?\)/H
MONTANA
10 0 10 20 30 40
MOAA ATLAS 2,
Prepared jy U.S. Department of Commerce,
National Oceanic and Atmospheric Adminlstri
National weather Service, Office of Hydrolog)
Prepared lor U.S. Department of Agriculture,
Soil Conservation Service, Engineering Divisio
ISOPtUV/IALS OF 2-YR 24-HR PRECIPITATION
IN TENTHS OF AN INCH
Figure D-6. NOAA Atlas 2 - Montana - Isopluvials of 2-year, 24-hour precipitation in tenths of an inch.
O
"O
O
CD
Q)
(/)

-------
Figure D-7. Technical Paper No. 40 Rainfall Frequency Atlas of the United States for Durations from 30 Minutes to 24 Hours and Return Periods
from 1 to 100 Years - 10-Year, 6-Hour Rainfall (inches).

-------
Table D-4. Atlas 2 and technical paper map results
D
I
ro
CD


2-year, 24-hour storm
10-year, 24-hour storm
25-year, 24-hour storm
10-year, 6-hour storm

Indicator city
Depth
Intensity
Depth
Intensity
Depth
Intensity
Depth
Intensity
State
(inches)
(inches/hr)
(inches)
(inches/hr)
(inches)
(inches/hr)
(inches)
(inches/hr)
Alabama
Montgomery
4.50
0.19
6.5
0.27
7.6
0.32
4.60
0.77
Arkansas
Little Rock
4.10
0.17
6.05
0.25
7
0.29
4.35
0.73
California
Sacramento
2.00
0.08
3
0.13
3.5
0.15
1.70
0.28
Colorado
Denver
2.00
0.08
3
0.13
3.8
0.16
2.30
0.38
Connecticut
Hartford
3.10
0.13
4.8
0.2
5.5
0.23
3.25
0.54
Florida
Tallahassee
4.75
0.20
7.4
0.31
8.5
0.35
5.25
0.88
Georgia
Atlanta
3.70
0.15
5.5
0.23
6.5
0.27
4.20
0.70
Hawaii
Honolulu
4.75
0.20
7.8
0.33
8.9
0.37
4.80
0.80
Idaho
Boise
1.20
0.05
1.8
0.08
2.2
0.09
1.20
0.20
Iowa
Des Moines
3.25
0.14
4.7
0.2
5.5
0.23
3.54
0.59
Kansas
Kansas City
3.50
0.15
5.2
0.22
6.1
0.25
3.90
0.65
Louisiana
Baton Rouge
5.25
0.22
8.2
0.34
9.1
0.38
5.75
0.96
Maine
Augusta
2.80
0.12
4.25
0.18
4.9
0.2
2.90
0.48
Massachusetts
Boston
3.10
0.13
4.5
0.19
5.5
0.23
3.30
0.55
Michigan
Lansing
2.40
0.10
3.6
0.15
4.2
0.18
2.70
0.45
Minnesota
St. Paul
2.75
0.11
4.2
0.18
4.7
0.2
3.10
0.52
Mississippi
Jackson
4.45
0.19
6.7
0.28
7.8
0.33
4.70
0.78
Missouri
Kansas City
3.45
0.14
5.3
0.22
6
0.25
3.85
0.64
Montana
Helena
1.30
0.05
2.1
0.09
2.4
0.1
1.10
0.18
Nebraska
Lincoln
3.00
0.13
4.8
0.2
5.4
0.23
3.52
0.59
New Hampshire
Manchester
2.80
0.12
4.3
0.18
5
0.21
3.20
0.53
New York
Albany
2.90
0.12
4
0.17
5.9
0.25
3.10
0.52
North Dakota
Bismarck
1.90
0.08
3.25
0.14
3.75
0.16
2.50
0.42
Oklahoma
Oklahoma City
3.70
0.15
5.8
0.24
6.9
0.29
4.25
0.71
Oregon
Salem
2.50
0.10
3.5
0.15
4
0.17
2.90
0.48
Rhode Island
Providence
3.20
0.13
4.8
0.2
5.7
0.24
3.40
0.57
South Dakota
Pierre
2.25
0.09
3.5
0.15
4.1
0.17
2.75
0.46
Texas
Fort Worth
3.90
0.16
6.3
0.26
7.4
0.31
4.55
0.76
Vermont
Montpelier
2.40
0.10
3.7
0.15
4.25
0.18
2.70
0.45
Washington
Seattle
2.00
0.08
3
0.13
3.4
0.14
1.40
0.23
Wisconsin
Madison
2.80
0.12
4.1
0.17
4.75
0.2
3.15
0.53
Wyoming
Cheyenne
1.60
0.07
2.4
0.1
2.8
0.12
1.90
0.32
>
"O
"O
0
3
Q_
X
D
0
g
~o'
1	i
Q)
M
o'
3
D
Q)
Z)
0
"O
CD
(/)
0
<
0
o'
c
0)
o
"O
o
0
Q)
(/)

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
Sources: PRISM, Oregon State University, http://mole.nacse.org/prism/nn/index.phtml; PRISM
data sets were developed through projects funded partly by the USD A Natural Resources
Conservation Service, USDA Forest Service, NOAA Office of Global Programs, and others.
Class/Location and Latitude/Longitude Sources: USGS Geographic Names Information
System (GNIS) http://geonames.usgs.gov/pls/gnispublic/, and National Oceanic and
Atmospheric Administration (NOAA) National Weather Service (NWS) Precipitation Frequency
Data Server (PFDS) Atlas 14 http://hdsc.nws.noaa.gov/hdsc/pfds/.
PRISM Data Variables:
Parameter: Annual Precipitation
Start year: 1895
Stop year: 2007
Units: inches
Table D-5. Average annual precipitation data (1895 to 2007)
Indicator city, State
USGS class location
(e.g., Populated Place)
OR
NOAA NWS Precipitation Frequency Data Server
Atlas 14 site location (e.g., WSO ARP)
Latitude
(Northing)
Longitude
(Westing)
Average
precipitation
(inches)
Montgomery, Alabama
Montgomery Populated Place (165344)
32.3668
-86.2999
49.04
Phoenix, Arizona
Phoenix WSFO AP, AZ (02-6481)
33.443
-111.99
7.74
Little Rock, Arkansas
Little Rock Populated Place (83350)
34.7464
-92.2895
47.62
Sacramento, California
Sacramento Populated Place (1659564)
38.5815
-121.494
18.39
Denver, Colorado
Denver Populated Place (201738)
39.7391
-104.984
13.31
Hartford, Connecticut
Hartford Populated Place (213160)
41.7637
-72.685
44.41
Dover, Delaware
Dover, Delaware (07-2730)
39.2583
-75.516
43.02
Tallahassee, Florida
Tallahassee Populated Place (308416)
30.4382
-84.2807
62.01
Atlanta, Georgia
Atlanta Populated Place (351615)
33.7489
-84.3879
50.86
Boise, Idaho
Boise Populated Place (400590)
43.6135
-116.203
11.33
Chicago, Illinois
Chicago O'Hare WSO ARP, IL (11-1549)
41.986
-87.9142
33.04
Indianapolis, Indiana
Indianapolis WSFO AP, IN (12-4259)
39.7317
-86.2789
39.69
Des Moines, Iowa
Des Moines Populated Place (465961)
41.6005
-93.6091
31.66
Kansas City, Kansas
Kansas City Populated Place (478635)
39.1141
-94.6274
36.69
Frankfort, Kentucky
Frankfort Lock 4, KY (15-3028)
38.235
-84.8817
45.01
Baton Rouge, Louisiana
Baton Rouge Populated Place (1629914)
30.4507
-91.1545
58.77
Augusta, Maine
Augusta Populated Place (581636)
44.3106
-69.7794
41.67
Baltimore, Maryland
Baltimore WSO AP, MD (18-0465)
39.1722
-76.6839
42.28
Boston, Massachusetts
Boston Populated Place (617565)
42.3584
-71.0597
42.40
Lansing, Michigan
Lansing Populated Place (1625035)
42.7325
-84.5555
30.28
Saint Paul, Minnesota
Saint Paul Populated Place (662851)
44.9444
-93.0932
28.76
D-30

-------
Appendix D: Precipitation Data Representative of Major U.S. Metropolitan Areas
Indicator city, State
USGS class location
(e.g., Populated Place)
OR
NOAA NWS Precipitation Frequency Data Server
Atlas 14 site location (e.g., WSO ARP)
Latitude
(Northing)
Longitude
(Westing)
Average
precipitation
(inches)
Jackson, Mississippi
Jackson Populated Place (711543)
32.2987
-90.1848
52.48
Helena, Montana
Helena Populated Place (802116)
46.5927
-112.036
11.78
Lincoln, Nebraska
Lincoln Populated Place (837279)
40.8
-96.6669
28.31
Las Vegas, Nevada
Las Vegas WSO Airport, NV (26-4436)
36.0833
-115.166
3.82
Manchester, New Hampshire
Manchester Populated Place (868243)
42.9956
-71.4547
40.23
Hightstown, New Jersey
Hightstown 2 W, NJ (28-3951)
40.265
-74.5642
47.00
Santa Fe, New Mexico
Santa Fe, NM (29-8072)
35.6833
-105.9
15.46
Albany, New York
Albany Populated Place (977310)
42.6525
-73.7562
36.91
Charlotte, North Carolina
Charlotte WSO ARPT, NC (31-1690)
35.2225
-80.9542
43.19
Bismarck, North Dakota
Bismarck Populated Place (1035849)
46.8083
-100.783
16.09
Columbus, Ohio
Columbus WSO Airport, OH (33-1786)
39.9914
-82.8808
37.79
Oklahoma City, Oklahoma
Oklahoma City Populated Place (1102140)
35.4675
-97.5164
32.81
Salem, Oregon
Salem Populated Place (1167861)
44.9428
-123.035
40.72
Philadelphia, Pennsylvania
Philadelphia WSO AP, PA (36-6889)
39.8683
-75.2311
41.62
Providence, Rhode Island
Providence Populated Place (1219851)
41.8239
-71.4128
44.74
Columbia, South Carolina
Columbia WSFO AP, SC (38-1939)
33.9456
-81.1219
45.45
Pierre, South Dakota
Pierre Populated Place (1266887)
44.3683
-100.35
16.10
Nashville, Tennessee
Nashville WSO Airport, TN (40-6402)
36.1253
-86.6764
46.11
Fort Worth, Texas
Fort Worth Populated Place (1380947)
32.7254
-97.3208
32.52
Salt Lake City, Utah
Salt Lake City NWSFO, UT (42-7598)
40.7725
-111.955
14.56
Montpelier, Vermont
Montpelier Populated Place (1461834)
44.26
-72.5753
34.00
Arlington, Virginia
Washington Reagan AP (44-8906)
38.865
-77.0342
40.35
Seattle, Washington
Seattle Populated Place (1512650)
47.6062
-122.332
35.26
Charleston, West Virginia
Charleston WSFO AP, WV (46-1570)
38.3794
-81.5914
42.82
Madison, Wisconsin
Madison Populated Place (1581834)
43.073
-89.4012
31.47
Cheyenne, Wyoming
Cheyenne Populated Place (1609077)
41.1399
-104.82
14.74
District of Columbia
National Arboretum DC (18-6350)
38.9133
-76.97
41.74
D-31

-------
Appendix E
Determination of Development Rates in U.S. Watersheds

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
Land Use Data Sources
There are multiple sources of land cover change information at a national scale. The U.S.
Environmental Protection Agency (EPA) initially reviewed the U.S. Department of Agriculture
(USDA) National Resources Inventory (NRI). The NRI is a publicly available data set that tracks
temporal changes in major land covers within the United States using a sampling method. NRI
data is available for the entire United States on an 8-digit hydrologic unit basis (hydrologic units1
or HUCs) for the years 1982, 1987, 1992, and 1997. Data from these years are comparable and
can be used for analyzing land cover change at several broad scales. Data from NRI are also
available for the years 2001, 2002, and 2003, though not on an HUC basis. Data from these years
are available only at the major river basin level, and are not directly comparable to data from
earlier years because of changes in statistical and sampling methodologies.
The U.S. Geological Survey (USGS) National Land Cover Dataset (NLCD) provides another
national source of data on land cover change. The Multi-Resolution Land Characteristics
Consortium (MRLC) has produced the NLCD data sets that are based on classification of
30-meter pixel resolution Landsat ETM+ (TM) satellite imagery. NLCD data is publicly
available for the years 1992 and 2001.2 Because new developments in mapping methodology,
new sources of input data, and changes in the mapping legend for the 2001 National Land Cover
Database (NLCD 2001) confound direct comparison between NLCD 2001 and the 1992 National
Land Cover Dataset (NLCD 1992), USGS prepared and recently released the NLCD 1992/2001
Retrofit Land Cover Change Product. The NLCD 1992/2001 Retrofit Land Cover Change
Product was developed to offer more accurate direct change analysis between the two products.
The NLCD 1992/2001 Retrofit Land Cover Change Product uses a specially developed
methodology to provide land cover change information at the Anderson Level I classification
scale,3 relying on decision tree classification of Landsat imagery from 1992 and 2001. While
NLCD 1992 reported on developed land in the categories of low-intensity residential, high-
intensity residential, commercial/industrial/transportation, and urban/recreational grasses, NLCD
2001 reported categories of developed low, medium, high, and open space. To compare change
between the two data sets, the developed categories were merged into one overall urban class.
Unchanged pixels between the two dates are coded with the NLCD 2001 Anderson Level I class
code, while changed pixels are labeled with a from-to land cover change value. Modified
Anderson Level I Classifications include the following:
•	Open water
•	Urban
•	Barren
•	Forest
•	Grassland/Shrub
•	Agriculture
•	Wetlands Ice/Snow
1	For definitions of hydrologic units, see http://water.usgs.gov/GIS/huc.html.
2	To obtain data and for further descriptions of NLCD products, see http://www.mrlc.gov/index.asp.
3	See http://landcover.usgs.gov/pdf/anderson.pdf
E-1

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
The NLCD 1992/2001 Retrofit Land Cover Change Product was intended to provide a current,
consistent, and seamless data set for the United States at medium spatial resolution for Anderson
Level I classes. This land cover change map and all documents pertaining to it are considered
provisional until a formal accuracy assessment can be conducted. Detailed definitions and
discussion of the NLCD 1992/2001 Retrofit Land Cover Change Product will be provided in an
upcoming paper.4
Watershed Boundary Data Sources
HUC boundaries encompass surface water drainage to an outlet and are useful units for
summarization of land cover change information. HUCs through four levels were created in the
1970s as the USGS developed a hierarchical HUC that divides the country into 21 regions, 222
subregions, 352 accounting units, and 2,149 cataloging units on the basis of surface hydrologic
features. The 8-digit HUC, or cataloging unit (now referred to as a basin), is approximately
448,000 acres. By the 1990s, geographic information system (GIS) tools facilitated the mapping
of digital HUC boundaries and the Natural Resources Conservation Service started to delineate
HUCs to the 5th and 6th level by using GIS to meet 1:24,000 National Map Accuracy Standards.
With increased interest from other federal, state, and local entities, this initiative became an
interagency effort to create the Watershed Boundary Dataset (WBD) as a hydrologically correct,
seamless, and consistent national GIS database. The new levels are called watershed (5th level,
10-digit) and subwatershed (6th level, 12-digit). The watershed level is typically 40,000 to
250,000 acres, and the subwatershed level is typically 10,000 to 40,000 acres. An estimated
22,000 watersheds and 160,000 subwatersheds will be mapped to the 5th and 6th level when the
data set is complete.
The WBD provides publicly available spatial data for watershed boundaries at various scales
within the United States. Attachment A shows the status of the WBD for the nation as of April
28, 2008. EPA is working to certify 10- and 12-digit HUC boundaries for the remainder of the
country. Because the WBD is not complete, and because the water quality model used by EPA
(SPARROW) does not operate on HUC boundaries, EPA chose not to characterize land use
change on a HUC basis.
Another option for summarizing national land cover change in drainage area units is to use a
coarser USGS data set than the WBD. A consistent, national scale watershed data set was
prepared to match the Reach File Version 1.0 (RF1) hydrology data set, a vector database used
extensively by EPA and states to model approximately 700,000 miles of streams and open waters
in the conterminous United States. This watershed data set, the Enhanced River Reach File 1.2
(ERF 12), was designed to be a digital database of river reaches capable of supporting regional
and national water-quality and river-flow modeling.5 The ERF 12 coverage extends the earlier
drainage area founded on the 1-kilometer data for North America.6 ERF12 contains 67,171
watersheds with a minimum size of 247 acres (1 km2) and an average size of 30,182 acres (122
4	Coan, M., Fry, J., Homer, C., Meyer D. K., Larson, C., and J. Wickham. In Progress. Completion of the National
Land Cover Database 1992/2001 Change Product.
5	Further information on ERF12 watersheds is at http://water.usgs.gov/GIS/metadata/usgswrd/XML/erfl_2.xml.
6	Verdin, K.L., and S.K. Jenson. 1996. Development of continental scale digital elevation models and extraction of
hydrographic features. In Proceedings of the Third International Conference/Workshop on Integrating GIS and
Environmental Modeling. CD-ROM. Santa Fe, NM.
E-2

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
km2). (See DCN 43097 in the Administrative Record for an index of the spatial data analyses
conducted for the proposed rule.
Analysis
EPA prepared spreadsheets summarizing the amount of acreage changing from undeveloped land
to developed land within each state and ERF 12 watershed of the United States by aggregating
land cover change estimates from the NLCD 1992/2001 Retrofit Land Cover Change Product on
an ERF12 level. Figure 1 shows an example of the Retrofit Land Cover Change Product near an
urban area.
Figure E-1. NLCD 1992/2001 Retrofit Land Cover Change
Product near Seattle, Washington.
Legend	] F
~ RF1 watershed
1992-2001 Change Data
| Change to Urban
NLCD Class
Modified Anderson
Agriculture
| Barren
Forest
_J Grassland/Shrub
Ice/Snow
Urban
~~I Wetlands
Attachment B provides processing notes for the NLCD 1992/2001 Retrofit data analysis run by
EPA. This data was combined with EPA Region boundaries by spatially joining the National
Atlas State coverage7 attributed with EPA Region borders and the ERF1_2 watersheds. EPA
Regional boundaries were thus joined to ERF 12 watershed so that developed areas within each
region could be identified. Representative urban areas describing the fastest developing and
greatest land area developing between 1992 and 2001 in a watershed are shown in Table E-1 and
Figure E-2.
1 http://www.nationalatlas.gov/mld/statesp.htnil
E-3

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
Table E-1. Fastest developing watersheds by
representative urban area per EPA Region
EPA Region
Indicator cities
1
Manchester, NH
2
Albany, NY
3
Washington, DC, VA, MD
4
Atlanta, GA
5
Chicago, IL—IN
6
Dallas, Fort Worth, and Arlington, TX
7
Kansas City, MO and KS
8
Denver and Aurora, CO
9
Las Vegas, NV
10
Boise City, ID
Seattle, WA
Seattle,
WA
^-=Man Chester,
Albany,"T
NY I \ • {
Boise City,
jiA/ashington,
,DC-VA-(MD
Chicago,
IL--IN «
Denver-- *
Aurora, CO
Kansas City,
MO-KS *
Las Vegas,
NV
Atlanta, GA
Dallas-Fort Worth-
Arlington, TX
Figure E-2. Urban Areas Selected for Each EPA Region.
After representative urban area watersheds were targeted, the ERF 12 watershed summarizations
were also aggregated by state. When summarizing by state, an approach was needed to apportion
partial watersheds (those crossing state boundaries) into state aggregations. Allocation of
developed acreage within ERF12 watersheds overlapping state boundaries was done using a
basic area-weighting approach.
Table E-2 shows a national overview of developed acreage according to data source. Attachment
C presents state level results for developed acreage change in each ERF 12 watershed.
E-4

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
Table E-2. National change in developed acreage (1992-2001)
Source
1992
(million acres)
2001
(million acres)
NLCD RETROFIT
96.8
102.1
State aggregated NLCD RETROFIT
ERF1_2 watersheds
96.5
101.8
NLCD (original)
40.3
101.3
NRI
87
106.3
Attachment A. Status of Watershed Boundary Data Set
NATURAL RESOURCES CONSERVATION SERVICE
WATERSHED BOUNDARY DATASET (WBD) STATUS
Status as of April 28, 2008
I I Not Started
I I In Progress
~ Pending Certification
I 1 Certified*
* Data are certified on a state wde basis
(intrastate) until cross state (interstate)
edge matching can be completed.
Soi ce: USDA NFCS NCGC Geotpat&l Data Ware I oite
ftp ://ftp.ftm .nrcs.usda.gov/pu bAwb d/status_ma ps/h u csta tusstate .p df
E-5

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
Attachment B. NLCD 1992-2001 Land-cover Change Estimates Processing Notes
J. Wickham and T. Wade (EPA/ORD/NERL/ESD/LEB)
02/08/2008
Grabbed erf file from water.usgs.gov/gis site
61,215 watersheds in erfl_2ws_lg (61215 records in vat)
1186 single pixel watersheds
67,172 polygons in vector version
Frequency of vector version returns 61215 unique values of grid code
Projected into albers
67171 polygons in albers version
61214 unique grid-codes
5957 multi-part polygons
WS is used throughout as an acronym for watershed; WS is also equivalent to grid-code.
US was split into 8 regions to estimate changes (nwl, nw2, nel, ne2, swl, sw2, sel, se2)
changes were compiled into master file using
$llcclass = <>lcclass + $llcclass where $1 = masterfile and <> = the
regional files the equation sums watersheds that were split across regions. Areas were summed
then converted to percentages. The attribute labeled area was used to convert to percentages.
47 watersheds split across regions.
8562 9124 14264 14776 14857 15006 15324 16331 18374 23999 24000 24242 25213 25230
26327 26371 28767 30796 30816 31089 31378 33206 35283 36052 38432 38460 38550 38598
39269 39841 41670 41698 41758 42307 42309 42697 42712 42817 42831 43718 58938 58994
59002 80951 81729
8 WS outside US
grid-code 95005 completely outside US (in CA west of ME)
grid-code 32171 completely outside US (in CA Nrth of MT)
others 31486 31534, 31535, 35239,35276, 42648
These WS have a -1 for LA01 and LA92 (explained below).
82 watersheds (grid-codes) in water; no land change estimates
1671 1762 1917 1918 4439 4440 4454 4455 10527 11764 11765 11766 11973 12181 12384
12440 12553 12555 18003 18014 19055 21249 21251 22621 22728 22793 22821 22854 26515
29044 29059 29063 29072 29261 32037 32051 32102 32108 32136 34650 34664 34665 34666
34787 34810 34811 34814 34818 38005 38051 38053 38154 38266 38816 38817 38818 38819
38820 38821 38975 40981 41030 42294 44296 45535 46510 46544 56786 57091 57095 57211
57427 57428 57526 57685 57689 57696 60232 65001 65002 80886 81545
Attributes LA92 and LA01 = land area in watershed for 1992 and 2001, respectively. Large
changes in the amount of water will cause anomalies in the percentage differences. For example,
WS 26515 in north central Missouri went from ag to water. It's a small (lkmA2) WS. These
E-6

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
anomalies will be common on the coast, and otherwise spread throughout were the small
(i.e., lkmA2) WS overlay such changes. WS 81555 is a coastal example at the mouth of the Miss.
R. The attribute Dwatpct was added as a flag for changing amounts of water. It was calculated as
( ( LA01 - LA92 ) / area ) * 100. The max value of Dwatpct is 67 percent in WS = 56768. The
change is due to sedimentation of a reservoir in the PNW. There are 191 WS with Dwatpct >=
5 percent.
Attachment C. State Level Results for NLCD Developed Acreage Change in Each
Watershed
State
1992devacre
2001devacre
Annual development
rate
Alabama
2,066,843
2,197,496
14,517
Arizona
1,285,258
1,408,765
13,723
Arkansas
1,836,496
1,912,492
8,444
California
6,278,143
6,524,815
27,408
Colorado
1,609,387
1,751,902
15,835
Connecticut
727,078
736,015
993
Delaware
113,052
120,720
852
Florida
4,526,626
4,870,084
38,162
Georgia
3,026,921
3,319,772
32,539
Idaho
847,520
898,118
5,622
Illinois
4,014,480
4,197,711
20,359
Indiana
2,238,170
2,353,388
12,802
Iowa
2,527,225
2,621,239
10,446
Kansas
2,463,194
2,666,459
22,585
Kentucky
1,740,669
1,830,327
9,962
Louisiana
1,788,423
1,903,893
12,830
Maine
653,697
695,682
4,665
Maryland
698,386
754,384
6,222
Massachusetts
1,174,234
1,203,889
3,295
Michigan
3,746,569
3,946,405
22,204
Minnesota
2,648,001
2,731,809
9,312
Mississippi
1,721,138
1,827,869
11,859
Missouri
2,845,661
2,967,035
13,486
Montana
1,187,901
1,246,068
6,463
Nebraska
1,699,570
1,752,634
5,896
Nevada
572,706
646,794
8,232
New Hampshire
426,786
443,382
1,844
New Jersey
1,124,705
1,162,613
4,212
New Mexico
799,207
838,609
4,378
New York
2,682,301
2,752,573
7,808
North Carolina
2,816,229
2,984,988
18,751
North Dakota
1,667,029
1,727,113
6,676
Ohio
3,549,025
3,705,445
17,380
Oklahoma
2,387,508
2,537,439
16,659
Oregon
1,552,824
1,617,957
7,237
Pennsylvania
3,006,384
3,149,538
15,906
Rhode Island
173,764
177,085
369
E-7

-------
Appendix E: Determination of Development Rates in U.S. Watersheds
State
1992devacre
2001devacre
Annual development
rate
South Carolina
1,487,194
1,632,427
16,137
South Dakota
1,315,111
1,388,776
8,185
Tennessee
2,189,700
2,307,879
13,131
Texas
8,229,892
8,791,816
62,436
Utah
758,031
831,309
8,142
Vermont
304,570
309,628
562
Virginia
1,818,500
1,954,409
15,101
Washington
2,286,574
2,402,332
12,862
West Virginia
1,016,805
1,049,133
3,592
Wisconsin
2,345,956
2,411,998
7,338
Wyoming
491,168
516,818
2,850
District of Columbia
26,381
28,865
276
State aggregated totals
96,492,992
101,807,897
590,545
E-8

-------
Appendix F
Turbidity Report Tables

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
10/18/06
71.7
BHRBP2
10/18/06
68.9
BHRBP2
10/18/06
67.9
BHRBP2
10/18/06
66.8
BHRBP2
10/18/06
65.3
BHRBP2
10/18/06
64.2
BHRBP2
10/18/06
63
BHRBP2
10/18/06
62.1
BHRBP2
10/18/06
61.3
BHRBP2
10/18/06
60.7
BHRBP2
10/18/06
61
BHRBP2
10/18/06
61.3
BHRBP2
10/18/06
61.8
BHRBP2
10/18/06
62.1
BHRBP2
10/18/06
62.6
BHRBP2
10/18/06
64.4
BHRBP2
10/18/06
83.4
BHRBP2
10/18/06
114.1
BHRBP2
10/18/06
65.9
BHRBP2
10/18/06
65.8
BHRBP2
10/18/06
75.2
BHRBP2
10/18/06
97
BHRBP2
10/18/06
6.6
BHRBP2
10/18/06
6.6
BHRBP2
10/18/06
6.3
BHRBP2
10/18/06
6.7
BHRBP2
10/18/06
6.2
BHRBP2
10/18/06
6.6
BHRBP2
10/18/06
6.6
BHRBP2
10/18/06
6.8
BHRBP2
10/18/06
6.7
BHRBP2
10/18/06
6.6
BHRBP2
10/18/06
6.7
BHRBP2
10/18/06
6.8
BHRBP2
10/18/06
359.8
BHRBP2
10/18/06
268.9
BHRBP2
10/18/06
3.9
BHRBP2
10/18/06
4
BHRBP2
10/18/06
3.1
BHRBP2
10/18/06
5.1
BHRBP2
10/18/06
5
BHRBP2
10/18/06
5.1
BHRBP2
10/18/06
5.1
BHRBP2
10/19/06
167.2
BHRBP2
10/19/06
166.5
F-1

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
10/19/06
158.9
BHRBP2
10/19/06
150.3
BHRBP2
10/19/06
150.8
BHRBP2
10/19/06
146.8
BHRBP2
10/19/06
148.3
BHRBP2
10/19/06
143
BHRBP2
10/19/06
140
BHRBP2
10/19/06
144.2
BHRBP2
10/19/06
145
BHRBP2
10/19/06
149
BHRBP2
10/19/06
169.9
BHRBP2
10/19/06
168
BHRBP2
10/19/06
169.7
BHRBP2
10/19/06
167.2
BHRBP2
10/19/06
162.2
BHRBP2
10/19/06
156.4
BHRBP2
10/19/06
148.2
BHRBP2
10/19/06
146.9
BHRBP2
10/19/06
148.8
BHRBP2
10/19/06
143.3
BHRBP2
10/19/06
139.2
BHRBP2
10/19/06
134.1
BHRBP2
10/19/06
128.8
BHRBP2
10/19/06
119.3
BHRBP2
10/19/06
119.9
BHRBP2
10/19/06
118
BHRBP2
10/19/06
112.9
BHRBP2
10/19/06
108.9
BHRBP2
10/19/06
103.5
BHRBP2
10/19/06
101.4
BHRBP2
10/19/06
99.2
BHRBP2
10/19/06
98
BHRBP2
10/19/06
96.8
BHRBP2
10/19/06
96.2
BHRBP2
10/19/06
96.4
BHRBP2
10/19/06
95.9
BHRBP2
10/19/06
93.6
BHRBP2
10/19/06
89.3
BHRBP2
10/19/06
83.3
BHRBP2
10/19/06
80.6
BHRBP2
10/19/06
81.1
BHRBP2
10/19/06
81.8
BHRBP2
10/19/06
83
BHRBP2
10/19/06
83.4
BHRBP2
10/19/06
110.9
F-2

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
10/19/06
76.2
BHRBP2
10/20/06
67.1
BHRBP2
10/20/06
181.6
BHRBP2
10/20/06
69.9
BHRBP2
10/23/06
171.4
BHRBP2
10/23/06
153.2
BHRBP2
10/23/06
131.5
BHRBP2
10/23/06
147.4
BHRBP2
10/23/06
33.3
BHRBP2
10/23/06
139.2
BHRBP2
10/24/06
60
BHRBP2
10/24/06
65.1
BHRBP2
10/24/06
73.1
BHRBP2
10/24/06
70
BHRBP2
10/24/06
51.1
BHRBP2
10/24/06
40.9
BHRBP2
10/24/06
36.2
BHRBP2
10/24/06
32.7
BHRBP2
10/24/06
20.4
BHRBP2
10/24/06
37.3
BHRBP2
10/24/06
29.8
BHRBP2
10/24/06
12.9
BHRBP2
10/24/06
28.9
BHRBP2
10/24/06
27.9
BHRBP2
10/24/06
25.1
BHRBP2
10/25/06
55.5
BHRBP2
10/25/06
45.6
BHRBP2
10/25/06
51.3
BHRBP2
10/25/06
53.4
BHRBP2
10/25/06
44.8
BHRBP2
10/25/06
46.2
BHRBP2
10/25/06
49.5
BHRBP2
10/25/06
44.7
BHRBP2
10/25/06
43.1
BHRBP2
10/25/06
46.8
BHRBP2
10/25/06
51.6
BHRBP2
10/25/06
41.1
BHRBP2
10/25/06
38.3
BHRBP2
10/25/06
47.4
BHRBP2
10/25/06
45.7
BHRBP2
10/25/06
43.8
BHRBP2
10/25/06
40.5
BHRBP2
10/25/06
38.7
BHRBP2
10/25/06
56
BHRBP2
10/25/06
53.3
F-3

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
10/25/06
57.3
BHRBP2
10/25/06
57.4
BHRBP2
10/25/06
34.8
BHRBP2
10/25/06
30.6
BHRBP2
10/25/06
58.5
BHRBP2
10/25/06
35.8
BHRBP2
10/25/06
26.1
BHRBP2
10/26/06
46.5
BHRBP2
10/26/06
43.4
BHRBP2
10/26/06
37.1
BHRBP2
10/26/06
38.4
BHRBP2
10/26/06
40.8
BHRBP2
10/26/06
44
BHRBP2
10/26/06
42
BHRBP2
10/26/06
43.4
BHRBP2
10/26/06
50.1
BHRBP2
10/26/06
60.4
BHRBP2
10/26/06
65.1
BHRBP2
10/26/06
61.6
BHRBP2
10/26/06
59.6
BHRBP2
10/26/06
63.1
BHRBP2
10/26/06
57
BHRBP2
10/26/06
77.2
BHRBP2
10/26/06
101.4
BHRBP2
10/26/06
40.5
BHRBP2
10/26/06
54.1
BHRBP2
10/26/06
83.1
BHRBP2
10/26/06
25.6
BHRBP2
10/26/06
16.2
BHRBP2
11/05/06
57.7
BHRBP2
11/05/06
67.1
BHRBP2
11/05/06
66.6
BHRBP2
11/05/06
69.2
BHRBP2
11/05/06
76
BHRBP2
11/05/06
83
BHRBP2
11/05/06
129.9
BHRBP2
11/05/06
54.7
BHRBP2
11/05/06
45.1
BHRBP2
11/05/06
99.9
BHRBP2
11/05/06
56.9
BHRBP2
11/05/06
809.1
BHRBP2
11/05/06
186.6
BHRBP2
11/05/06
44.8
BHRBP2
11/05/06
46.1
BHRBP2
11/05/06
19.8
F-4

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/05/06
39.4
BHRBP2
11/05/06
48.1
BHRBP2
11/05/06
27.9
BHRBP2
11/05/06
73
BHRBP2
11/05/06
28.3
BHRBP2
11/05/06
34
BHRBP2
11/05/06
62
BHRBP2
11/05/06
27
BHRBP2
11/05/06
52.6
BHRBP2
11/05/06
17
BHRBP2
11/05/06
31
BHRBP2
11/05/06
21.7
BHRBP2
11/05/06
30.2
BHRBP2
11/05/06
124.1
BHRBP2
11/05/06
989.7
BHRBP2
11/05/06
820.7
BHRBP2
11/05/06
299.4
BHRBP2
11/05/06
239.5
BHRBP2
11/05/06
78.1
BHRBP2
11/05/06
46.1
BHRBP2
11/05/06
32.7
BHRBP2
11/05/06
56.9
BHRBP2
11/05/06
74.1
BHRBP2
11/05/06
57.7
BHRBP2
11/05/06
72
BHRBP2
11/05/06
77
BHRBP2
11/05/06
77.8
BHRBP2
11/05/06
83.9
BHRBP2
11/05/06
223.8
BHRBP2
11/05/06
93.6
BHRBP2
11/05/06
156.2
BHRBP2
11/05/06
115
BHRBP2
11/05/06
169.9
BHRBP2
11/06/06
51.1
BHRBP2
11/06/06
234.4
BHRBP2
11/06/06
255.7
BHRBP2
11/06/06
167.9
BHRBP2
11/06/06
159.8
BHRBP2
11/06/06
926.7
BHRBP2
11/06/06
217.7
BHRBP2
11/06/06
39.5
BHRBP2
11/06/06
112.1
BHRBP2
11/06/06
82
BHRBP2
11/06/06
45.2
BHRBP2
11/06/06
40.4
F-5

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/06/06
54.7
BHRBP2
11/06/06
75.8
BHRBP2
11/06/06
14.1
BHRBP2
11/06/06
91.6
BHRBP2
11/06/06
20.9
BHRBP2
11/06/06
27
BHRBP2
11/06/06
21.3
BHRBP2
11/06/06
31.9
BHRBP2
11/06/06
58.7
BHRBP2
11/06/06
56.2
BHRBP2
11/06/06
773.4
BHRBP2
11/06/06
301.4
BHRBP2
11/06/06
116
BHRBP2
11/06/06
120.8
BHRBP2
11/06/06
137
BHRBP2
11/06/06
150.9
BHRBP2
11/06/06
303.2
BHRBP2
11/06/06
126.4
BHRBP2
11/06/06
49.7
BHRBP2
11/06/06
25
BHRBP2
11/06/06
49.7
BHRBP2
11/06/06
99.8
BHRBP2
11/06/06
679.6
BHRBP2
11/06/06
317.8
BHRBP2
11/06/06
570.8
BHRBP2
11/06/06
70.6
BHRBP2
11/06/06
147.1
BHRBP2
11/06/06
389.4
BHRBP2
11/06/06
87.8
BHRBP2
11/06/06
719.8
BHRBP2
11/06/06
403.8
BHRBP2
11/06/06
86.7
BHRBP2
11/06/06
150.1
BHRBP2
11/06/06
97.8
BHRBP2
11/06/06
53.6
BHRBP2
11/06/06
102.8
BHRBP2
11/06/06
91.9
BHRBP2
11/06/06
397.8
BHRBP2
11/06/06
57.5
BHRBP2
11/06/06
68.9
BHRBP2
11/06/06
69.5
BHRBP2
11/06/06
68
BHRBP2
11/06/06
55.8
BHRBP2
11/06/06
70.9
BHRBP2
11/06/06
101.7
F-6

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/06/06
122
BHRBP2
11/06/06
50.3
BHRBP2
11/06/06
182.1
BHRBP2
11/06/06
64.9
BHRBP2
11/06/06
119.9
BHRBP2
11/06/06
95.7
BHRBP2
11/06/06
60
BHRBP2
11/06/06
51.5
BHRBP2
11/06/06
62.5
BHRBP2
11/06/06
77.6
BHRBP2
11/06/06
48.3
BHRBP2
11/06/06
54.8
BHRBP2
11/06/06
34.6
BHRBP2
11/06/06
106.3
BHRBP2
11/06/06
25.1
BHRBP2
11/06/06
44.5
BHRBP2
11/06/06
33.4
BHRBP2
11/06/06
36.3
BHRBP2
11/06/06
40.4
BHRBP2
11/06/06
179.4
BHRBP2
11/06/06
69.4
BHRBP2
11/06/06
82.3
BHRBP2
11/07/06
271.4
BHRBP2
11/07/06
55.7
BHRBP2
11/07/06
119
BHRBP2
11/07/06
86.1
BHRBP2
11/07/06
24.2
BHRBP2
11/07/06
563.1
BHRBP2
11/07/06
680.7
BHRBP2
11/07/06
17.6
BHRBP2
11/07/06
70.5
BHRBP2
11/07/06
63.7
BHRBP2
11/07/06
24.6
BHRBP2
11/07/06
101.2
BHRBP2
11/07/06
25.7
BHRBP2
11/07/06
230.6
BHRBP2
11/07/06
22
BHRBP2
11/07/06
28.9
BHRBP2
11/07/06
634.3
BHRBP2
11/07/06
107.7
BHRBP2
11/07/06
57.3
BHRBP2
11/07/06
86.7
BHRBP2
11/07/06
20.1
BHRBP2
11/07/06
85.2
BHRBP2
11/07/06
62.6
F-7

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/07/06
94.1
BHRBP2
11/07/06
24.5
BHRBP2
11/07/06
158.2
BHRBP2
11/07/06
384
BHRBP2
11/07/06
189.2
BHRBP2
11/07/06
40.4
BHRBP2
11/07/06
34.8
BHRBP2
11/07/06
96
BHRBP2
11/07/06
50.1
BHRBP2
11/07/06
74.2
BHRBP2
11/07/06
271.7
BHRBP2
11/07/06
43.5
BHRBP2
11/07/06
30.2
BHRBP2
11/07/06
75.1
BHRBP2
11/07/06
166.5
BHRBP2
11/07/06
204.6
BHRBP2
11/07/06
389.8
BHRBP2
11/07/06
562.3
BHRBP2
11/07/06
66.9
BHRBP2
11/07/06
188.9
BHRBP2
11/07/06
255.2
BHRBP2
11/07/06
231
BHRBP2
11/07/06
246.8
BHRBP2
11/07/06
396.6
BHRBP2
11/07/06
212.1
BHRBP2
11/07/06
34.4
BHRBP2
11/07/06
18.8
BHRBP2
11/07/06
32.8
BHRBP2
11/07/06
140.6
BHRBP2
11/07/06
109.2
BHRBP2
11/07/06
162.9
BHRBP2
11/07/06
72.6
BHRBP2
11/07/06
99.4
BHRBP2
11/07/06
133.2
BHRBP2
11/07/06
334.3
BHRBP2
11/07/06
104.6
BHRBP2
11/07/06
43.6
BHRBP2
11/07/06
509.7
BHRBP2
11/07/06
78.6
BHRBP2
11/07/06
107.5
BHRBP2
11/07/06
212.6
BHRBP2
11/07/06
136.9
BHRBP2
11/07/06
134.2
BHRBP2
11/07/06
89.1
BHRBP2
11/07/06
38.8
F-8

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/07/06
60
BHRBP2
11/07/06
85.1
BHRBP2
11/07/06
74.9
BHRBP2
11/07/06
52.5
BHRBP2
11/07/06
269
BHRBP2
11/07/06
77.2
BHRBP2
11/07/06
74.6
BHRBP2
11/07/06
52.8
BHRBP2
11/07/06
299.3
BHRBP2
11/07/06
692.1
BHRBP2
11/07/06
298.8
BHRBP2
11/07/06
33.5
BHRBP2
11/07/06
127.6
BHRBP2
11/07/06
185.7
BHRBP2
11/07/06
54.2
BHRBP2
11/07/06
32.9
BHRBP2
11/07/06
187.6
BHRBP2
11/07/06
81.7
BHRBP2
11/07/06
47.9
BHRBP2
11/07/06
75
BHRBP2
11/07/06
338.1
BHRBP2
11/07/06
50.8
BHRBP2
11/08/06
16.5
BHRBP2
11/08/06
7.9
BHRBP2
11/08/06
56.7
BHRBP2
11/08/06
9.4
BHRBP2
11/08/06
11.8
BHRBP2
11/08/06
7.8
BHRBP2
11/08/06
68.8
BHRBP2
11/08/06
96.8
BHRBP2
11/08/06
37.9
BHRBP2
11/08/06
30.7
BHRBP2
11/08/06
78.6
BHRBP2
11/08/06
57.3
BHRBP2
11/08/06
308.9
BHRBP2
11/08/06
623.6
BHRBP2
11/08/06
298.9
BHRBP2
11/08/06
56.5
BHRBP2
11/08/06
549.7
BHRBP2
11/08/06
58
BHRBP2
11/08/06
53.3
BHRBP2
11/08/06
103.4
BHRBP2
11/08/06
86.8
BHRBP2
11/08/06
22
BHRBP2
11/08/06
23.7
F-9

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/08/06
17.5
BHRBP2
11/08/06
51.7
BHRBP2
11/08/06
31.3
BHRBP2
11/08/06
20.6
BHRBP2
11/08/06
11.6
BHRBP2
11/08/06
18.3
BHRBP2
11/08/06
19.8
BHRBP2
11/08/06
40.8
BHRBP2
11/08/06
32.3
BHRBP2
11/08/06
11.9
BHRBP2
11/08/06
152.3
BHRBP2
11/08/06
16.2
BHRBP2
11/08/06
23.4
BHRBP2
11/08/06
38.1
BHRBP2
11/08/06
12.7
BHRBP2
11/08/06
626.7
BHRBP2
11/08/06
62.1
BHRBP2
11/08/06
47.6
BHRBP2
11/08/06
21.9
BHRBP2
11/08/06
77.8
BHRBP2
11/08/06
55.8
BHRBP2
11/08/06
207
BHRBP2
11/08/06
43.7
BHRBP2
11/08/06
25.2
BHRBP2
11/08/06
28.4
BHRBP2
11/08/06
17.1
BHRBP2
11/08/06
12.4
BHRBP2
11/08/06
45.3
BHRBP2
11/08/06
24.3
BHRBP2
11/08/06
17.5
BHRBP2
11/08/06
105.5
BHRBP2
11/08/06
57.2
BHRBP2
11/08/06
14.1
BHRBP2
11/08/06
201.8
BHRBP2
11/08/06
769
BHRBP2
11/08/06
143.7
BHRBP2
11/08/06
261.1
BHRBP2
11/08/06
28.8
BHRBP2
11/08/06
127
BHRBP2
11/08/06
158.7
BHRBP2
11/08/06
439.2
BHRBP2
11/08/06
402
BHRBP2
11/08/06
297.9
BHRBP2
11/08/06
278.1
BHRBP2
11/08/06
171.3
F-10

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/08/06
48.8
BHRBP2
11/08/06
48
BHRBP2
11/08/06
24.8
BHRBP2
11/08/06
20.8
BHRBP2
11/08/06
18.1
BHRBP2
11/08/06
80.5
BHRBP2
11/08/06
33
BHRBP2
11/08/06
207.8
BHRBP2
11/08/06
545.7
BHRBP2
11/08/06
577.7
BHRBP2
11/08/06
165.8
BHRBP2
11/08/06
74.1
BHRBP2
11/08/06
115.3
BHRBP2
11/09/06
31.3
BHRBP2
11/09/06
44.7
BHRBP2
11/09/06
53.8
BHRBP2
11/09/06
687.7
BHRBP2
11/09/06
34.3
BHRBP2
11/09/06
70.7
BHRBP2
11/09/06
80.6
BHRBP2
11/09/06
65.4
BHRBP2
11/09/06
243.7
BHRBP2
11/09/06
36.8
BHRBP2
11/09/06
62.4
BHRBP2
11/09/06
65
BHRBP2
11/09/06
17.9
BHRBP2
11/09/06
32.8
BHRBP2
11/09/06
38.5
BHRBP2
11/09/06
69
BHRBP2
11/09/06
583.6
BHRBP2
11/09/06
153
BHRBP2
11/09/06
34.7
BHRBP2
11/09/06
39
BHRBP2
11/09/06
71.7
BHRBP2
11/09/06
112.1
BHRBP2
11/09/06
36.2
BHRBP2
11/09/06
74.8
BHRBP2
11/09/06
51
BHRBP2
11/09/06
80.1
BHRBP2
11/09/06
10.4
BHRBP2
11/09/06
39.7
BHRBP2
11/09/06
76.9
BHRBP2
11/09/06
101.2
BHRBP2
11/09/06
902.2
BHRBP2
11/09/06
305
F-11

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/09/06
161.1
BHRBP2
11/09/06
144.2
BHRBP2
11/09/06
15
BHRBP2
11/09/06
13
BHRBP2
11/09/06
143.1
BHRBP2
11/09/06
28
BHRBP2
11/09/06
19.3
BHRBP2
11/09/06
7.9
BHRBP2
11/09/06
10.8
BHRBP2
11/09/06
8
BHRBP2
11/09/06
17.8
BHRBP2
11/09/06
15.2
BHRBP2
11/09/06
9.5
BHRBP2
11/09/06
12.6
BHRBP2
11/09/06
9.1
BHRBP2
11/09/06
16.1
BHRBP2
11/09/06
7.5
BHRBP2
11/09/06
6.3
BHRBP2
11/09/06
125.1
BHRBP2
11/09/06
8.7
BHRBP2
11/09/06
11.7
BHRBP2
11/09/06
12.7
BHRBP2
11/09/06
29.8
BHRBP2
11/09/06
491.9
BHRBP2
11/09/06
10.6
BHRBP2
11/09/06
12.5
BHRBP2
11/09/06
50.5
BHRBP2
11/09/06
17.2
BHRBP2
11/10/06
47.4
BHRBP2
11/10/06
14.3
BHRBP2
11/10/06
16.5
BHRBP2
11/10/06
8.3
BHRBP2
11/10/06
14.4
BHRBP2
11/10/06
12
BHRBP2
11/10/06
18.4
BHRBP2
11/10/06
19.8
BHRBP2
11/10/06
9.8
BHRBP2
11/10/06
18.4
BHRBP2
11/10/06
12.8
BHRBP2
11/10/06
23.5
BHRBP2
11/10/06
16.2
BHRBP2
11/10/06
14.7
BHRBP2
11/10/06
19.4
BHRBP2
11/10/06
63.1
BHRBP2
11/10/06
39.3
F-12

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/10/06
41.4
BHRBP2
11/10/06
24.1
BHRBP2
11/10/06
59.8
BHRBP2
11/10/06
74.7
BHRBP2
11/10/06
9.3
BHRBP2
11/10/06
11.5
BHRBP2
11/10/06
8.5
BHRBP2
11/10/06
11.4
BHRBP2
11/10/06
40.3
BHRBP2
11/10/06
8.3
BHRBP2
11/10/06
11.4
BHRBP2
11/10/06
12.9
BHRBP2
11/10/06
11.3
BHRBP2
11/10/06
7.5
BHRBP2
11/10/06
32.5
BHRBP2
11/10/06
8.2
BHRBP2
11/10/06
26.5
BHRBP2
11/10/06
8.2
BHRBP2
11/10/06
71
BHRBP2
11/11/06
14.4
BHRBP2
11/11/06
14.9
BHRBP2
11/11/06
10.9
BHRBP2
11/11/06
13.1
BHRBP2
11/11/06
13.9
BHRBP2
11/11/06
15.5
BHRBP2
11/11/06
12.8
BHRBP2
11/11/06
8.8
BHRBP2
11/11/06
17.8
BHRBP2
11/11/06
16.5
BHRBP2
11/11/06
25
BHRBP2
11/11/06
16.3
BHRBP2
11/11/06
12.2
BHRBP2
11/11/06
14.5
BHRBP2
11/11/06
8.5
BHRBP2
11/11/06
29.7
BHRBP2
11/11/06
20.6
BHRBP2
11/11/06
19.8
BHRBP2
11/11/06
10
BHRBP2
11/11/06
19.9
BHRBP2
11/11/06
107.1
BHRBP2
11/11/06
47
BHRBP2
11/11/06
8.1
BHRBP2
11/11/06
27.6
BHRBP2
11/11/06
8.4
BHRBP2
11/11/06
18.2
F-13

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/1 2/06
10
BHRBP2
11/1 2/06
12.2
BHRBP2
11/1 2/06
19.8
BHRBP2
11/1 2/06
17.4
BHRBP2
11/1 2/06
18
BHRBP2
11/1 2/06
9.8
BHRBP2
11/1 2/06
14.6
BHRBP2
11/1 2/06
9.8
BHRBP2
11/1 2/06
22.3
BHRBP2
11/1 2/06
19.3
BHRBP2
11/1 2/06
16.4
BHRBP2
11/1 2/06
9.9
BHRBP2
11/1 2/06
15.7
BHRBP2
11/1 2/06
9.8
BHRBP2
11/1 2/06
52.8
BHRBP2
11/1 2/06
28.6
BHRBP2
11/1 2/06
15.8
BHRBP2
11/1 2/06
12.5
BHRBP2
11/1 2/06
18
BHRBP2
11/1 2/06
13.6
BHRBP2
11/1 2/06
47.5
BHRBP2
11/1 2/06
20.5
BHRBP2
11/1 2/06
11.1
BHRBP2
11/1 2/06
14.2
BHRBP2
11/1 2/06
18.2
BHRBP2
11/1 3/06
12.3
BHRBP2
11/1 3/06
9.6
BHRBP2
11/1 3/06
9.9
BHRBP2
11/1 3/06
130.7
BHRBP2
11/1 3/06
17.8
BHRBP2
11/1 3/06
14.3
BHRBP2
11/1 3/06
17.1
BHRBP2
11/1 3/06
10.1
BHRBP2
11/1 3/06
16.6
BHRBP2
11/1 3/06
36.2
BHRBP2
11/1 3/06
16.2
BHRBP2
11/1 3/06
16.5
BHRBP2
11/1 3/06
10
BHRBP2
11/1 3/06
15.9
BHRBP2
11/1 3/06
10.6
BHRBP2
11/1 3/06
125.6
BHRBP2
11/1 3/06
13.9
BHRBP2
11/1 3/06
21.6
BHRBP2
11/1 3/06
67.5
BHRBP2
11/1 3/06
21.8
F-14

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/1 3/06
36.5
BHRBP2
11/1 3/06
20.6
BHRBP2
11/1 3/06
15.3
BHRBP2
11/1 3/06
18.6
BHRBP2
11/1 3/06
28
BHRBP2
11/1 3/06
15.7
BHRBP2
11/1 3/06
41.8
BHRBP2
11/1 3/06
17.5
BHRBP2
11/1 3/06
31.9
BHRBP2
11/1 3/06
36.1
BHRBP2
11/1 3/06
16.5
BHRBP2
11/1 3/06
15.4
BHRBP2
11/1 3/06
21.4
BHRBP2
11/1 3/06
21.4
BHRBP2
11/1 3/06
13.8
BHRBP2
11/1 3/06
13.6
BHRBP2
11/1 3/06
14.1
BHRBP2
11/1 3/06
12.2
BHRBP2
11/1 3/06
25.9
BHRBP2
11/1 3/06
11.7
BHRBP2
11/1 3/06
43.1
BHRBP2
11/1 3/06
14
BHRBP2
11/1 3/06
111.3
BHRBP2
11/1 3/06
11.3
BHRBP2
11/1 3/06
70.3
BHRBP2
11/14/06
13.7
BHRBP2
11/14/06
22.5
BHRBP2
11/14/06
63.2
BHRBP2
11/14/06
36.8
BHRBP2
11/14/06
32.7
BHRBP2
11/14/06
21.7
BHRBP2
11/14/06
69.2
BHRBP2
11/14/06
19.3
BHRBP2
11/14/06
20.5
BHRBP2
11/14/06
23.3
BHRBP2
11/14/06
73.5
BHRBP2
11/14/06
107.6
BHRBP2
11/14/06
25.5
BHRBP2
11/14/06
24.8
BHRBP2
11/14/06
18.5
BHRBP2
11/14/06
20.7
BHRBP2
11/14/06
20.3
BHRBP2
11/14/06
11.7
BHRBP2
11/14/06
17.4
BHRBP2
11/14/06
20.4
F-15

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/14/06
27
BHRBP2
11/14/06
17.7
BHRBP2
11/14/06
34.7
BHRBP2
11/14/06
24.7
BHRBP2
11/14/06
40.4
BHRBP2
11/14/06
60.9
BHRBP2
11/14/06
30.9
BHRBP2
11/14/06
29.5
BHRBP2
11/14/06
170.6
BHRBP2
11/14/06
29.7
BHRBP2
11/14/06
16.9
BHRBP2
11/14/06
23.7
BHRBP2
11/14/06
15.3
BHRBP2
11/14/06
118.4
BHRBP2
11/14/06
24.3
BHRBP2
11/14/06
17.4
BHRBP2
11/14/06
15.2
BHRBP2
11/14/06
20.8
BHRBP2
11/14/06
17.8
BHRBP2
11/14/06
16.6
BHRBP2
11/14/06
25.4
BHRBP2
11/14/06
24.5
BHRBP2
11/14/06
17.7
BHRBP2
11/14/06
15.2
BHRBP2
11/14/06
16.4
BHRBP2
11/14/06
17.1
BHRBP2
11/14/06
28.6
BHRBP2
11/14/06
37.1
BHRBP2
11/14/06
19.2
BHRBP2
11/14/06
23.3
BHRBP2
11/14/06
19.5
BHRBP2
11/14/06
34.2
BHRBP2
11/14/06
24.3
BHRBP2
11/14/06
24.6
BHRBP2
11/14/06
24.9
BHRBP2
11/14/06
172.9
BHRBP2
11/14/06
38.1
BHRBP2
11/14/06
37.7
BHRBP2
11/14/06
41.8
BHRBP2
11/14/06
48.7
BHRBP2
11/14/06
57.1
BHRBP2
11/14/06
48.6
BHRBP2
11/14/06
48.6
BHRBP2
11/14/06
50.6
BHRBP2
11/14/06
56.3
F-16

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/14/06
36.4
BHRBP2
11/14/06
33.3
BHRBP2
11/14/06
35.7
BHRBP2
11/14/06
38.5
BHRBP2
11/14/06
47.6
BHRBP2
11/15/06
38.3
BHRBP2
11/15/06
17.7
BHRBP2
11/15/06
30.8
BHRBP2
11/15/06
197.1
BHRBP2
11/15/06
52.8
BHRBP2
11/15/06
17.5
BHRBP2
11/15/06
9.7
BHRBP2
11/15/06
13.3
BHRBP2
11/15/06
13.7
BHRBP2
11/15/06
19.3
BHRBP2
11/15/06
15.3
BHRBP2
11/15/06
15.5
BHRBP2
11/15/06
10.4
BHRBP2
11/15/06
15.9
BHRBP2
11/15/06
16.8
BHRBP2
11/15/06
43.7
BHRBP2
11/15/06
13
BHRBP2
11/15/06
16.8
BHRBP2
11/15/06
10.7
BHRBP2
11/15/06
48.9
BHRBP2
11/15/06
13.1
BHRBP2
11/15/06
44.2
BHRBP2
11/15/06
14.1
BHRBP2
11/15/06
12.8
BHRBP2
11/15/06
37
BHRBP2
11/15/06
20.3
BHRBP2
11/15/06
18.3
BHRBP2
11/15/06
34.6
BHRBP2
11/15/06
118.1
BHRBP2
11/15/06
22.3
BHRBP2
11/15/06
102.8
BHRBP2
11/15/06
11.9
BHRBP2
11/15/06
74
BHRBP2
11/15/06
21.2
BHRBP2
11/15/06
22.2
BHRBP2
11/15/06
23.1
BHRBP2
11/15/06
30
BHRBP2
11/15/06
18
BHRBP2
11/15/06
51.4
BHRBP2
11/15/06
105.2
F-17

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/15/06
24.5
BHRBP2
11/15/06
14.9
BHRBP2
11/15/06
29.9
BHRBP2
11/15/06
18.5
BHRBP2
11/15/06
242.5
BHRBP2
11/15/06
25.6
BHRBP2
11/15/06
328.3
BHRBP2
11/15/06
12.2
BHRBP2
11/15/06
23.1
BHRBP2
11/15/06
29.9
BHRBP2
11/15/06
24.1
BHRBP2
11/15/06
17.8
BHRBP2
11/15/06
26
BHRBP2
11/15/06
41.5
BHRBP2
11/15/06
75.6
BHRBP2
11/15/06
22.2
BHRBP2
11/15/06
11.8
BHRBP2
11/15/06
25
BHRBP2
11/15/06
42.2
BHRBP2
11/15/06
21.4
BHRBP2
11/15/06
19.7
BHRBP2
11/15/06
13.6
BHRBP2
11/15/06
19.2
BHRBP2
11/15/06
21.1
BHRBP2
11/15/06
44
BHRBP2
11/15/06
19
BHRBP2
11/16/06
30.5
BHRBP2
11/16/06
28.2
BHRBP2
11/16/06
35.8
BHRBP2
11/16/06
37.1
BHRBP2
11/16/06
26.7
BHRBP2
11/16/06
37.8
BHRBP2
11/16/06
22.1
BHRBP2
11/16/06
476.7
BHRBP2
11/16/06
31.3
BHRBP2
11/16/06
122.8
BHRBP2
11/16/06
154.3
BHRBP2
11/16/06
154.1
BHRBP2
11/16/06
46.8
BHRBP2
11/16/06
37.6
BHRBP2
11/16/06
60.6
BHRBP2
11/16/06
98.8
BHRBP2
11/16/06
36.1
BHRBP2
11/16/06
71.7
BHRBP2
11/16/06
301.7
F-18

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/16/06
160.8
BHRBP2
11/16/06
201
BHRBP2
11/16/06
72.7
BHRBP2
11/16/06
46
BHRBP2
11/16/06
35.3
BHRBP2
11/16/06
49.1
BHRBP2
11/16/06
36.9
BHRBP2
11/16/06
34
BHRBP2
11/16/06
31.6
BHRBP2
11/16/06
43.3
BHRBP2
11/16/06
41.6
BHRBP2
11/16/06
76.7
BHRBP2
11/16/06
38.8
BHRBP2
11/16/06
28.8
BHRBP2
11/16/06
51.6
BHRBP2
11/16/06
89.7
BHRBP2
11/16/06
46.7
BHRBP2
11/16/06
53.9
BHRBP2
11/16/06
43.5
BHRBP2
11/16/06
41.3
BHRBP2
11/16/06
41.2
BHRBP2
11/16/06
42.1
BHRBP2
11/16/06
71
BHRBP2
11/16/06
12.6
BHRBP2
11/16/06
16
BHRBP2
11/16/06
24.3
BHRBP2
11/16/06
24.1
BHRBP2
11/16/06
39.6
BHRBP2
11/16/06
35.3
BHRBP2
11/16/06
47.1
BHRBP2
11/16/06
55.5
BHRBP2
11/16/06
47.8
BHRBP2
11/16/06
73.3
BHRBP2
11/16/06
55.9
BHRBP2
11/16/06
78.1
BHRBP2
11/1 7/06
30.5
BHRBP2
11/1 7/06
23.2
BHRBP2
11/1 7/06
17.6
BHRBP2
11/1 7/06
26.2
BHRBP2
11/1 7/06
47.5
BHRBP2
11/1 7/06
21.8
BHRBP2
11/1 7/06
20.8
BHRBP2
11/1 7/06
27.2
BHRBP2
11/1 7/06
11
BHRBP2
11/1 7/06
319.8
F-19

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/1 7/06
22.9
BHRBP2
11/1 7/06
25
BHRBP2
11/1 7/06
15.8
BHRBP2
11/1 7/06
13.4
BHRBP2
11/1 7/06
16.7
BHRBP2
11/1 7/06
16.9
BHRBP2
11/1 7/06
25.4
BHRBP2
11/1 7/06
36.7
BHRBP2
11/1 7/06
36.6
BHRBP2
11/20/06
15.9
BHRBP2
11/20/06
20.2
BHRBP2
11/20/06
20.4
BHRBP2
11/20/06
28.2
BHRBP2
11/20/06
22.9
BHRBP2
11/20/06
21.6
BHRBP2
11/20/06
13.9
BHRBP2
11/20/06
22
BHRBP2
11/20/06
25.3
BHRBP2
11/20/06
24.6
BHRBP2
11/20/06
22.3
BHRBP2
11/20/06
17.3
BHRBP2
11/20/06
18.5
BHRBP2
11/20/06
41.7
BHRBP2
11/20/06
76.6
BHRBP2
11/20/06
28.2
BHRBP2
11/20/06
28.1
BHRBP2
11/20/06
15.5
BHRBP2
11/20/06
28.2
BHRBP2
11/20/06
18.3
BHRBP2
11/21/06
54.7
BHRBP2
11/21/06
32.6
BHRBP2
11/21/06
14.7
BHRBP2
11/21/06
35
BHRBP2
11/21/06
23.3
BHRBP2
11/21/06
21.1
BHRBP2
11/21/06
25.4
BHRBP2
11/21/06
25.4
BHRBP2
11/21/06
19.6
BHRBP2
11/21/06
19.2
BHRBP2
11/21/06
31.5
BHRBP2
11/21/06
24.4
BHRBP2
11/21/06
17.9
BHRBP2
11/21/06
24.5
BHRBP2
11/21/06
21.7
BHRBP2
11/21/06
19.2
F-20

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/21/06
230.7
BHRBP2
11/21/06
32.1
BHRBP2
11/21/06
28.5
BHRBP2
11/21/06
17.9
BHRBP2
11/21/06
18.1
BHRBP2
11/21/06
26.1
BHRBP2
11/21/06
27.8
BHRBP2
11/21/06
22.1
BHRBP2
11/21/06
16.5
BHRBP2
11/21/06
21.3
BHRBP2
11/21/06
23.6
BHRBP2
11/21/06
19.1
BHRBP2
11/21/06
31.6
BHRBP2
11/21/06
21.1
BHRBP2
11/21/06
24.5
BHRBP2
11/21/06
29.2
BHRBP2
11/21/06
22.1
BHRBP2
11/21/06
18.9
BHRBP2
11/21/06
30.8
BHRBP2
11/21/06
25.4
BHRBP2
11/21/06
28.9
BHRBP2
11/21/06
23.4
BHRBP2
11/21/06
15.3
BHRBP2
11/21/06
24.5
BHRBP2
11/21/06
25.5
BHRBP2
11/22/06
15
BHRBP2
11/22/06
12.4
BHRBP2
11/22/06
40.5
BHRBP2
11/22/06
49.2
BHRBP2
11/22/06
12.9
BHRBP2
11/22/06
217.3
BHRBP2
11/22/06
32.4
BHRBP2
11/22/06
304.8
BHRBP2
11/22/06
9.1
BHRBP2
11/22/06
20.4
BHRBP2
11/22/06
15
BHRBP2
11/22/06
48
BHRBP2
11/22/06
18.4
BHRBP2
11/22/06
26.1
BHRBP2
11/22/06
14.5
BHRBP2
11/22/06
31.4
BHRBP2
11/22/06
83.8
BHRBP2
11/22/06
26.8
BHRBP2
11/22/06
31.3
BHRBP2
11/22/06
26.7
F-21

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/22/06
15.9
BHRBP2
11/22/06
50.6
BHRBP2
11/22/06
24.1
BHRBP2
11/22/06
27.8
BHRBP2
11/22/06
143.8
BHRBP2
11/22/06
18.3
BHRBP2
11/22/06
14.6
BHRBP2
11/23/06
35.3
BHRBP2
11/23/06
29.9
BHRBP2
11/23/06
15
BHRBP2
11/23/06
124
BHRBP2
11/23/06
15.2
BHRBP2
11/23/06
31.7
BHRBP2
11/23/06
25.5
BHRBP2
11/23/06
58.7
BHRBP2
11/23/06
15.5
BHRBP2
11/23/06
15.7
BHRBP2
11/23/06
15.8
BHRBP2
11/23/06
23.7
BHRBP2
11/23/06
19.2
BHRBP2
11/23/06
17.8
BHRBP2
11/23/06
20.5
BHRBP2
11/23/06
15.7
BHRBP2
11/23/06
12.7
BHRBP2
11/23/06
91.5
BHRBP2
11/24/06
29.6
BHRBP2
11/24/06
28.9
BHRBP2
11/24/06
10
BHRBP2
11/24/06
16.9
BHRBP2
11/24/06
34.2
BHRBP2
11/24/06
23.7
BHRBP2
11/24/06
27
BHRBP2
11/24/06
14.3
BHRBP2
11/24/06
85.8
BHRBP2
11/24/06
31.3
BHRBP2
11/24/06
25.4
BHRBP2
11/24/06
29.4
BHRBP2
11/24/06
17.1
BHRBP2
11/24/06
36.1
BHRBP2
11/24/06
23.7
BHRBP2
11/24/06
39.2
BHRBP2
11/24/06
31
BHRBP2
11/24/06
20.4
BHRBP2
11/24/06
17.6
BHRBP2
11/24/06
33.9
F-22

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/24/06
52.9
BHRBP2
11/24/06
14.9
BHRBP2
11/24/06
12.5
BHRBP2
11/24/06
276.8
BHRBP2
11/24/06
73.9
BHRBP2
11/24/06
37.6
BHRBP2
11/25/06
19.8
BHRBP2
11/25/06
25.2
BHRBP2
11/25/06
24.2
BHRBP2
11/25/06
9.3
BHRBP2
11/25/06
22
BHRBP2
11/25/06
23.6
BHRBP2
11/25/06
33.5
BHRBP2
11/25/06
32.5
BHRBP2
11/25/06
11.8
BHRBP2
11/25/06
19.5
BHRBP2
11/25/06
16.8
BHRBP2
11/25/06
49.5
BHRBP2
11/25/06
22.4
BHRBP2
11/25/06
18.2
BHRBP2
11/25/06
9.9
BHRBP2
11/25/06
18.4
BHRBP2
11/25/06
14.8
BHRBP2
11/27/06
6.6
BHRBP2
11/27/06
33.5
BHRBP2
11/27/06
36.6
BHRBP2
11/27/06
37.3
BHRBP2
11/27/06
20.8
BHRBP2
11/27/06
23.6
BHRBP2
11/27/06
17.1
BHRBP2
11/27/06
33.7
BHRBP2
11/27/06
30.9
BHRBP2
11/27/06
32.3
BHRBP2
11/27/06
13.2
BHRBP2
11/27/06
19.5
BHRBP2
11/27/06
24
BHRBP2
11/27/06
32.6
BHRBP2
11/27/06
28.3
BHRBP2
11/27/06
21
BHRBP2
11/27/06
22.2
BHRBP2
11/27/06
26.9
BHRBP2
11/27/06
12.5
BHRBP2
11/27/06
114.4
BHRBP2
11/27/06
45.8
BHRBP2
11/27/06
34.1
F-23

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/27/06
45.9
BHRBP2
11/27/06
22
BHRBP2
11/27/06
84.6
BHRBP2
11/27/06
23.9
BHRBP2
11/27/06
16.7
BHRBP2
11/27/06
319.3
BHRBP2
11/27/06
188.7
BHRBP2
11/27/06
12.6
BHRBP2
11/27/06
24.6
BHRBP2
11/27/06
22.7
BHRBP2
11/27/06
22.5
BHRBP2
11/27/06
72.4
BHRBP2
11/27/06
4.2
BHRBP2
12/01/06
4.8
BHRBP2
12/01/06
7.4
BHRBP2
12/01/06
10
BHRBP2
12/01/06
8.8
BHRBP2
12/01/06
8.4
BHRBP2
12/01/06
33.9
BHRBP2
12/01/06
10.7
BHRBP2
1 2/02/06
24
BHRBP2
1 2/02/06
52
BHRBP2
12/11/06
63.6
BHRBP2
12/11/06
62.1
BHRBP2
12/11/06
74.8
BHRBP2
12/11/06
60.7
BHRBP2
12/11/06
58.7
BHRBP2
12/11/06
70.3
BHRBP2
12/11/06
57.9
BHRBP2
12/11/06
67.6
BHRBP2
12/11/06
118.6
BHRBP2
12/11/06
75.9
BHRBP2
12/11/06
48.1
BHRBP2
12/11/06
85.5
BHRBP2
12/11/06
94.8
BHRBP2
12/11/06
103.1
BHRBP2
12/11/06
135.1
BHRBP2
12/11/06
97.9
BHRBP2
12/11/06
68
BHRBP2
12/11/06
119.4
BHRBP2
12/11/06
115.6
BHRBP2
12/11/06
150.7
BHRBP2
12/11/06
130.1
BHRBP2
12/11/06
79.1
BHRBP2
12/11/06
87
F-24

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
12/11/06
81.6
BHRBP2
12/11/06
82.5
BHRBP2
12/11/06
59.8
BHRBP2
12/11/06
71.8
BHRBP2
12/11/06
66.9
BHRBP2
12/11/06
14.8
BHRBP2
12/11/06
19.2
BHRBP2
12/11/06
19.3
BHRBP2
12/11/06
12.1
BHRBP2
12/11/06
15.6
BHRBP2
12/11/06
126.8
BHRBP2
1 2/1 2/06
24.8
BHRBP2
1 2/1 2/06
28.6
BHRBP2
1 2/1 2/06
27.4
BHRBP2
1 2/1 2/06
28
BHRBP2
1 2/1 2/06
29.4
BHRBP2
1 2/1 2/06
22.2
BHRBP2
1 2/1 2/06
30.6
BHRBP2
1 2/1 2/06
18.8
BHRBP2
1 2/1 2/06
26.4
BHRBP2
1 2/1 2/06
271.3
BHRBP2
1 2/1 2/06
45.9
BHRBP2
1 2/1 2/06
68.8
BHRBP2
1 2/1 2/06
90.5
BHRBP2
1 2/1 2/06
79
BHRBP2
1 2/1 2/06
35.5
BHRBP2
1 2/1 2/06
32
BHRBP2
1 2/1 2/06
62.7
BHRBP2
1 2/1 2/06
39.3
BHRBP2
1 2/1 3/06
23.6
BHRBP2
1 2/1 3/06
32.1
BHRBP2
1 2/1 3/06
35.4
BHRBP2
1 2/1 3/06
33.4
BHRBP2
1 2/1 3/06
42.3
BHRBP2
1 2/1 3/06
32.5
BHRBP2
1 2/1 3/06
36.4
BHRBP2
1 2/1 3/06
42.6
BHRBP2
1 2/1 3/06
48
BHRBP2
1 2/1 3/06
42
BHRBP2
1 2/1 3/06
64.8
BHRBP2
1 2/1 3/06
58.2
BHRBP2
1 2/1 3/06
33.3
BHRBP2
1 2/1 3/06
42.6
BHRBP2
1 2/1 3/06
62.1
BHRBP2
1 2/1 3/06
54.5
F-25

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/1 3/06
20.8
BHRBP2
1 2/1 3/06
18.2
BHRBP2
1 2/1 3/06
144.8
BHRBP2
1 2/1 3/06
45.8
BHRBP2
1 2/1 3/06
78.7
BHRBP2
1 2/1 3/06
96.3
BHRBP2
1 2/1 3/06
19.5
BHRBP2
1 2/1 3/06
33.9
BHRBP2
1 2/1 3/06
21.5
BHRBP2
1 2/1 3/06
30.2
BHRBP2
1 2/1 3/06
24.1
BHRBP2
1 2/1 3/06
58.5
BHRBP2
1 2/1 3/06
24.6
BHRBP2
1 2/14/06
47.7
BHRBP2
1 2/14/06
44.8
BHRBP2
1 2/14/06
68.9
BHRBP2
1 2/14/06
27.1
BHRBP2
1 2/14/06
36.3
BHRBP2
1 2/14/06
15.6
BHRBP2
1 2/14/06
25.7
BHRBP2
1 2/14/06
31
BHRBP2
1 2/14/06
29.1
BHRBP2
1 2/14/06
30.4
BHRBP2
1 2/14/06
32.8
BHRBP2
1 2/14/06
44.6
BHRBP2
1 2/14/06
196.3
BHRBP2
1 2/14/06
26.9
BHRBP2
1 2/14/06
31.8
BHRBP2
1 2/14/06
318.8
BHRBP2
1 2/14/06
29.2
BHRBP2
1 2/14/06
31.9
BHRBP2
1 2/14/06
37.3
BHRBP2
1 2/14/06
48.4
BHRBP2
1 2/14/06
139.4
BHRBP2
1 2/14/06
193.6
BHRBP2
1 2/14/06
27.5
BHRBP2
1 2/14/06
26.1
BHRBP2
1 2/14/06
24.3
BHRBP2
1 2/14/06
23.6
BHRBP2
1 2/14/06
32.9
BHRBP2
1 2/14/06
40.2
BHRBP2
1 2/14/06
49
BHRBP2
1 2/14/06
47.5
BHRBP2
1 2/14/06
31.4
BHRBP2
1 2/14/06
21.4
F-26

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/14/06
30.5
BHRBP2
1 2/14/06
27
BHRBP2
1 2/14/06
29.1
BHRBP2
1 2/14/06
28.3
BHRBP2
1 2/14/06
18.2
BHRBP2
1 2/14/06
34.6
BHRBP2
1 2/15/06
21.5
BHRBP2
1 2/15/06
37.5
BHRBP2
1 2/15/06
12.4
BHRBP2
1 2/15/06
23.3
BHRBP2
1 2/15/06
85.3
BHRBP2
1 2/15/06
320.2
BHRBP2
1 2/15/06
47.6
BHRBP2
1 2/15/06
182
BHRBP2
1 2/15/06
30.4
BHRBP2
1 2/15/06
27
BHRBP2
1 2/15/06
14.7
BHRBP2
1 2/15/06
111.5
BHRBP2
1 2/15/06
18.5
BHRBP2
1 2/15/06
18.6
BHRBP2
1 2/15/06
29.6
BHRBP2
1 2/15/06
41
BHRBP2
1 2/15/06
28.1
BHRBP2
1 2/15/06
23.6
BHRBP2
1 2/15/06
119.5
BHRBP2
1 2/15/06
34.2
BHRBP2
1 2/15/06
41.2
BHRBP2
1 2/15/06
55.3
BHRBP2
1 2/15/06
23.2
BHRBP2
1 2/15/06
38.4
BHRBP2
1 2/15/06
48.8
BHRBP2
1 2/15/06
50.5
BHRBP2
1 2/15/06
41.7
BHRBP2
1 2/15/06
70
BHRBP2
1 2/15/06
75.5
BHRBP2
1 2/15/06
86
BHRBP2
1 2/15/06
184.1
BHRBP2
1 2/15/06
166
BHRBP2
1 2/15/06
113.1
BHRBP2
1 2/15/06
141.2
BHRBP2
1 2/15/06
193.1
BHRBP2
1 2/15/06
130.6
BHRBP2
1 2/15/06
35.4
BHRBP2
1 2/15/06
39.7
BHRBP2
1 2/15/06
28.3
F-27

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/15/06
46.7
BHRBP2
1 2/16/06
96.9
BHRBP2
1 2/16/06
173.2
BHRBP2
1 2/16/06
94.8
BHRBP2
1 2/16/06
66.4
BHRBP2
1 2/16/06
45.7
BHRBP2
1 2/16/06
106.6
BHRBP2
1 2/16/06
538.7
BHRBP2
1 2/16/06
115.3
BHRBP2
1 2/16/06
187.9
BHRBP2
1 2/16/06
122.8
BHRBP2
1 2/16/06
74.1
BHRBP2
1 2/16/06
163.8
BHRBP2
1 2/16/06
84.4
BHRBP2
1 2/16/06
448.5
BHRBP2
1 2/16/06
834.3
BHRBP2
1 2/16/06
40.9
BHRBP2
1 2/16/06
41.3
BHRBP2
1 2/16/06
22
BHRBP2
1 2/16/06
22
BHRBP2
1 2/16/06
22.1
BHRBP2
1 2/1 7/06
146.9
BHRBP2
1 2/1 7/06
156.5
BHRBP2
1 2/1 7/06
106.9
BHRBP2
1 2/1 7/06
14.8
BHRBP2
1 2/1 7/06
12.9
BHRBP2
1 2/1 7/06
46.1
BHRBP2
1 2/1 7/06
24.3
BHRBP2
1 2/1 7/06
18.3
BHRBP2
1 2/1 7/06
6.9
BHRBP2
1 2/1 7/06
11.3
BHRBP2
1 2/1 7/06
67.9
BHRBP2
1 2/1 7/06
55.6
BHRBP2
1 2/1 7/06
25.2
BHRBP2
1 2/1 7/06
44.2
BHRBP2
1 2/1 7/06
10.9
BHRBP2
1 2/1 7/06
43.9
BHRBP2
1 2/1 7/06
29.9
BHRBP2
1 2/1 7/06
188.7
BHRBP2
1 2/1 7/06
49.6
BHRBP2
1 2/1 7/06
25.8
BHRBP2
1 2/1 7/06
28
BHRBP2
1 2/1 7/06
178.7
BHRBP2
1 2/1 7/06
215.2
BHRBP2
1 2/1 7/06
141.7
F-28

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/1 7/06
221.5
BHRBP2
1 2/1 7/06
45.8
BHRBP2
1 2/1 7/06
472.1
BHRBP2
1 2/1 7/06
160.3
BHRBP2
1 2/1 7/06
56
BHRBP2
1 2/1 7/06
45.3
BHRBP2
1 2/1 7/06
93.5
BHRBP2
1 2/18/06
97.3
BHRBP2
1 2/18/06
246.8
BHRBP2
1 2/18/06
56.5
BHRBP2
1 2/18/06
58.9
BHRBP2
1 2/18/06
26
BHRBP2
1 2/18/06
15.5
BHRBP2
1 2/18/06
84.3
BHRBP2
1 2/18/06
14.9
BHRBP2
1 2/18/06
51
BHRBP2
1 2/18/06
18.3
BHRBP2
1 2/18/06
20.8
BHRBP2
1 2/18/06
43.7
BHRBP2
1 2/18/06
14.6
BHRBP2
1 2/18/06
35.8
BHRBP2
1 2/18/06
21.5
BHRBP2
1 2/18/06
61
BHRBP2
1 2/18/06
108.2
BHRBP2
1 2/18/06
36.2
BHRBP2
1 2/19/06
23.8
BHRBP2
1 2/19/06
31.1
BHRBP2
1 2/19/06
13.4
BHRBP2
1 2/19/06
40.1
BHRBP2
1 2/19/06
69.9
BHRBP2
1 2/19/06
15.1
BHRBP2
1 2/19/06
77.3
BHRBP2
1 2/19/06
52.4
BHRBP2
1 2/19/06
11.8
BHRBP2
1 2/19/06
21.7
BHRBP2
1 2/19/06
20.3
BHRBP2
1 2/19/06
29.8
BHRBP2
1 2/19/06
63.6
BHRBP2
1 2/19/06
40.2
BHRBP2
1 2/19/06
74
BHRBP2
1 2/19/06
50.1
BHRBP2
1 2/19/06
12.9
BHRBP2
1 2/19/06
102.6
BHRBP2
1 2/19/06
76.4
BHRBP2
1 2/19/06
106.6
F-29

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/19/06
29.9
BHRBP2
1 2/19/06
21.9
BHRBP2
1 2/19/06
19.1
BHRBP2
1 2/19/06
32.3
BHRBP2
1 2/19/06
47.2
BHRBP2
1 2/19/06
27.3
BHRBP2
1 2/20/06
7.3
BHRBP2
1 2/20/06
33.2
BHRBP2
1 2/20/06
9.2
BHRBP2
1 2/20/06
66.7
BHRBP2
1 2/20/06
24.7
BHRBP2
1 2/20/06
42.2
BHRBP2
1 2/20/06
60.2
BHRBP2
1 2/20/06
58.8
BHRBP2
1 2/20/06
65.3
BHRBP2
1 2/20/06
33
BHRBP2
1 2/20/06
18.7
BHRBP2
1 2/20/06
112.4
BHRBP2
1 2/20/06
9.4
BHRBP2
1 2/20/06
92.8
BHRBP2
1 2/20/06
14.7
BHRBP2
1 2/20/06
9
BHRBP2
1 2/20/06
21.4
BHRBP2
1 2/20/06
37.4
BHRBP2
1 2/20/06
12.4
BHRBP2
12/21/06
32.9
BHRBP2
12/21/06
35.8
BHRBP2
12/21/06
18.2
BHRBP2
12/21/06
34.7
BHRBP2
12/21/06
32.3
BHRBP2
12/21/06
45.7
BHRBP2
12/21/06
13.8
BHRBP2
12/21/06
40.5
BHRBP2
12/21/06
44.9
BHRBP2
12/21/06
69.5
BHRBP2
12/21/06
53.6
BHRBP2
12/21/06
68.3
BHRBP2
12/21/06
72.3
BHRBP2
12/21/06
93.3
BHRBP2
12/21/06
60.5
BHRBP2
12/21/06
92
BHRBP2
12/21/06
214.9
BHRBP2
12/21/06
9.2
BHRBP2
12/21/06
26.6
BHRBP2
12/21/06
11.9
F-30

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
12/21/06
32.4
BHRBP2
12/21/06
12.8
BHRBP2
12/21/06
15.9
BHRBP2
12/21/06
12.6
BHRBP2
12/21/06
13.3
BHRBP2
12/22/06
12.2
BHRBP2
12/22/06
15.9
BHRBP2
12/22/06
15.3
BHRBP2
12/22/06
37.2
BHRBP2
12/22/06
36.6
BHRBP2
12/22/06
22.8
BHRBP2
12/22/06
22.3
BHRBP2
12/22/06
12.1
BHRBP2
12/22/06
20.4
BHRBP2
12/22/06
41.4
BHRBP2
12/22/06
33.2
BHRBP2
12/22/06
31.1
BHRBP2
12/22/06
27.6
BHRBP2
12/22/06
30.9
BHRBP2
12/22/06
16.4
BHRBP2
12/22/06
34.1
BHRBP2
12/22/06
31.8
BHRBP2
12/22/06
27.4
BHRBP2
12/22/06
24.1
BHRBP2
12/22/06
12.4
BHRBP2
12/22/06
20.7
BHRBP2
12/22/06
15.7
BHRBP2
12/22/06
64.5
BHRBP2
12/22/06
27.7
BHRBP2
12/22/06
26.6
BHRBP2
12/22/06
20.8
BHRBP2
12/22/06
9.6
BHRBP2
12/22/06
36.9
BHRBP2
12/22/06
27.3
BHRBP2
12/23/06
24.6
BHRBP2
12/23/06
30.9
BHRBP2
12/23/06
19.8
BHRBP2
12/23/06
15.6
BHRBP2
12/23/06
64.7
BHRBP2
12/23/06
42.5
BHRBP2
12/23/06
26.5
BHRBP2
12/23/06
12.2
BHRBP2
12/23/06
29.9
BHRBP2
12/23/06
26
BHRBP2
12/23/06
56
F-31

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
12/23/06
34.3
BHRBP2
12/23/06
27.8
BHRBP2
12/23/06
24.5
BHRBP2
12/23/06
15.4
BHRBP2
12/23/06
32
BHRBP2
12/23/06
15.5
BHRBP2
12/23/06
71.8
BHRBP2
12/23/06
22.9
BHRBP2
12/23/06
35.6
BHRBP2
12/23/06
21.5
BHRBP2
12/23/06
19
BHRBP2
12/23/06
23.1
BHRBP2
1 2/26/06
24.5
BHRBP2
1 2/26/06
19.8
BHRBP2
1 2/26/06
19.6
BHRBP2
1 2/26/06
14.2
BHRBP2
1 2/26/06
24.2
BHRBP2
1 2/26/06
34.3
BHRBP2
1 2/26/06
20.3
BHRBP2
1 2/26/06
32.4
BHRBP2
1 2/26/06
36.4
BHRBP2
1 2/26/06
57.3
BHRBP2
1 2/26/06
23.2
BHRBP2
1 2/26/06
39.2
BHRBP2
1 2/26/06
45.3
BHRBP2
1 2/26/06
24.5
BHRBP2
1 2/26/06
39.3
BHRBP2
1 2/26/06
21.7
BHRBP2
1 2/26/06
25.5
BHRBP2
1 2/26/06
29.1
BHRBP2
1 2/26/06
11
BHRBP2
1 2/26/06
17.5
BHRBP2
1 2/26/06
13.6
BHRBP2
1 2/26/06
26.7
BHRBP2
1 2/26/06
22.7
BHRBP2
1 2/26/06
7.9
BHRBP2
12/27/06
13.3
BHRBP2
12/27/06
19.3
BHRBP2
12/27/06
10.6
BHRBP2
12/27/06
20
BHRBP2
12/27/06
24.5
BHRBP2
12/27/06
19.9
BHRBP2
12/27/06
31.4
BHRBP2
12/27/06
9
BHRBP2
12/27/06
38.8
F-32

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
12/27/06
47.4
BHRBP2
12/27/06
15.6
BHRBP2
12/27/06
68.3
BHRBP2
12/27/06
106.3
BHRBP2
12/27/06
20.2
BHRBP2
12/27/06
12.6
BHRBP2
12/27/06
31.1
BHRBP2
12/27/06
18
BHRBP2
12/27/06
44.1
BHRBP2
12/27/06
31.5
BHRBP2
12/27/06
31.3
BHRBP2
12/27/06
23.1
BHRBP2
12/27/06
19.7
BHRBP2
12/27/06
47.7
BHRBP2
12/27/06
19.5
BHRBP2
12/27/06
38.9
BHRBP2
12/27/06
11.3
BHRBP2
12/27/06
41.5
BHRBP2
12/27/06
57.7
BHRBP2
12/27/06
163.6
BHRBP2
12/27/06
10.6
BHRBP2
12/27/06
10
BHRBP2
12/27/06
54.1
BHRBP2
12/27/06
12
BHRBP2
12/27/06
31
BHRBP2
12/27/06
20.2
BHRBP2
12/27/06
24.1
BHRBP2
12/27/06
14
BHRBP2
12/27/06
11.4
BHRBP2
12/27/06
17.9
BHRBP2
12/27/06
11.6
BHRBP2
12/27/06
24.7
BHRBP2
1 2/28/06
14.8
BHRBP2
1 2/28/06
11.2
BHRBP2
1 2/28/06
29.2
BHRBP2
1 2/28/06
31.2
BHRBP2
1 2/28/06
10.6
BHRBP2
1 2/28/06
56.4
BHRBP2
1 2/28/06
30.3
BHRBP2
1 2/28/06
17
BHRBP2
1 2/28/06
68
BHRBP2
1 2/28/06
18.3
BHRBP2
1 2/28/06
17.7
BHRBP2
1 2/28/06
19.9
BHRBP2
1 2/28/06
13.3
F-33

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/28/06
17.1
BHRBP2
1 2/28/06
9.5
BHRBP2
1 2/28/06
14.8
BHRBP2
1 2/28/06
17
BHRBP2
1 2/28/06
17.4
BHRBP2
1 2/28/06
16.9
BHRBP2
1 2/28/06
7.8
BHRBP2
1 2/28/06
59
BHRBP2
1 2/28/06
15.1
BHRBP2
1 2/28/06
50.3
BHRBP2
1 2/28/06
25.9
BHRBP2
1 2/28/06
17.8
BHRBP2
1 2/28/06
113.2
BHRBP2
1 2/28/06
15.2
BHRBP2
1 2/28/06
17.4
BHRBP2
1 2/28/06
23.3
BHRBP2
1 2/28/06
17.5
BHRBP2
1 2/28/06
20.7
BHRBP2
1 2/28/06
19
BHRBP2
1 2/28/06
15.1
BHRBP2
1 2/28/06
17.8
BHRBP2
1 2/29/06
16
BHRBP2
1 2/29/06
20.4
BHRBP2
1 2/29/06
30.1
BHRBP2
1 2/29/06
26.7
BHRBP2
1 2/29/06
27.2
BHRBP2
1 2/29/06
20.7
BHRBP2
1 2/29/06
39.8
BHRBP2
1 2/29/06
16.1
BHRBP2
1 2/29/06
33.2
BHRBP2
1 2/29/06
35.2
BHRBP2
1 2/29/06
12.4
BHRBP2
1 2/29/06
106.8
BHRBP2
1 2/29/06
21.3
BHRBP2
1 2/29/06
9.1
BHRBP2
1 2/29/06
26.9
BHRBP2
1 2/29/06
12.1
BHRBP2
1 2/29/06
26.7
BHRBP2
1 2/29/06
18
BHRBP2
1 2/29/06
20.5
BHRBP2
1 2/29/06
9.8
BHRBP2
1 2/29/06
25.7
BHRBP2
1 2/29/06
39.2
BHRBP2
1 2/29/06
13.3
BHRBP2
1 2/29/06
46.7
F-34

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/29/06
11.4
BHRBP2
1 2/29/06
149.8
BHRBP2
1 2/29/06
10.5
BHRBP2
1 2/29/06
33.9
BHRBP2
1 2/29/06
23.6
BHRBP2
1 2/29/06
9.9
BHRBP2
1 2/29/06
26.3
BHRBP2
1 2/30/06
9.3
BHRBP2
1 2/30/06
19.2
BHRBP2
1 2/30/06
15.8
BHRBP2
1 2/30/06
10.6
BHRBP2
1 2/30/06
26.9
BHRBP2
1 2/30/06
46.2
BHRBP2
1 2/30/06
14.1
BHRBP2
1 2/30/06
74.1
BHRBP2
1 2/30/06
43.9
BHRBP2
1 2/30/06
15.7
BHRBP2
1 2/30/06
49.7
BHRBP2
1 2/30/06
72.5
BHRBP2
1 2/30/06
13.2
BHRBP2
1 2/30/06
37.2
BHRBP2
1 2/30/06
15.9
BHRBP2
1 2/30/06
35
BHRBP2
1 2/30/06
31.5
BHRBP2
1 2/30/06
11.9
BHRBP2
1 2/30/06
28.7
BHRBP2
1 2/30/06
21
BHRBP2
1 2/30/06
8.4
BHRBP2
1 2/30/06
15.2
BHRBP2
1 2/30/06
17.4
BHRBP2
01/02/07
87
BHRBP2
01/02/07
122.8
BHRBP2
01/02/07
94
BHRBP2
01/02/07
16.1
BHRBP2
01/02/07
31.6
BHRBP2
01/02/07
38.4
BHRBP2
01/02/07
34.8
BHRBP2
01/02/07
104.8
BHRBP2
01/02/07
31.2
BHRBP2
01/02/07
12.7
BHRBP2
01/02/07
75.4
BHRBP2
01/02/07
31.8
BHRBP2
01/02/07
9.3
BHRBP2
01/02/07
202.5
BHRBP2
01/02/07
35
F-35

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/02/07
7.3
BHRBP2
01/02/07
54.4
BHRBP2
01/02/07
40.9
BHRBP2
01/02/07
12.4
BHRBP2
01/02/07
112.7
BHRBP2
01/02/07
11.4
BHRBP2
01/02/07
11.3
BHRBP2
01/02/07
14.7
BHRBP2
01/02/07
15.1
BHRBP2
01/02/07
13.2
BHRBP2
01/02/07
19.4
BHRBP2
01/02/07
19
BHRBP2
01/02/07
13.4
BHRBP2
01/02/07
25.3
BHRBP2
01/02/07
14.6
BHRBP2
01/02/07
14.5
BHRBP2
01/02/07
34.8
BHRBP2
01/02/07
11.5
BHRBP2
01/02/07
44.4
BHRBP2
01/02/07
14.3
BHRBP2
01/02/07
170.7
BHRBP2
01/02/07
11.2
BHRBP2
01/02/07
24.5
BHRBP2
01/02/07
20.1
BHRBP2
01/02/07
12.9
BHRBP2
01/02/07
28.3
BHRBP2
01/02/07
10.4
BHRBP2
01/02/07
17.4
BHRBP2
01/02/07
32
BHRBP2
01/02/07
14.5
BHRBP2
01/02/07
33.2
BHRBP2
01/02/07
14.6
BHRBP2
01/02/07
83.9
BHRBP2
01/02/07
18.8
BHRBP2
01/02/07
27.4
BHRBP2
01/02/07
22.4
BHRBP2
01/02/07
8.3
BHRBP2
01/02/07
13.1
BHRBP2
01/02/07
14.3
BHRBP2
01/03/07
20.5
BHRBP2
01/03/07
41.9
BHRBP2
01/03/07
37
BHRBP2
01/03/07
21.1
BHRBP2
01/03/07
18.2
BHRBP2
01/03/07
54.9
F-36

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/03/07
17.5
BHRBP2
01/03/07
21.1
BHRBP2
01/03/07
13.6
BHRBP2
01/03/07
21
BHRBP2
01/03/07
10.7
BHRBP2
01/03/07
22.3
BHRBP2
01/03/07
18.2
BHRBP2
01/03/07
24.1
BHRBP2
01/03/07
10.1
BHRBP2
01/03/07
32.1
BHRBP2
01/03/07
31.4
BHRBP2
01/03/07
75.5
BHRBP2
01/03/07
9.8
BHRBP2
01/03/07
15.1
BHRBP2
01/03/07
61.9
BHRBP2
01/03/07
55.4
BHRBP2
01/03/07
14.8
BHRBP2
01/03/07
56.5
BHRBP2
01/03/07
74.6
BHRBP2
01/03/07
91.9
BHRBP2
01/03/07
89.8
BHRBP2
01/03/07
99.3
BHRBP2
01/03/07
32.5
BHRBP2
01/03/07
55.5
BHRBP2
01/03/07
33.5
BHRBP2
01/03/07
46.1
BHRBP2
01/03/07
38.3
BHRBP2
01/03/07
108.1
BHRBP2
01/03/07
709.9
BHRBP2
01/03/07
28.9
BHRBP2
01/03/07
152.5
BHRBP2
01/03/07
17.4
BHRBP2
01/03/07
98.4
BHRBP2
01/03/07
54.1
BHRBP2
01/03/07
58.1
BHRBP2
01/03/07
134.8
BHRBP2
01/03/07
22.9
BHRBP2
01/04/07
10.3
BHRBP2
01/04/07
13
BHRBP2
01/04/07
17.8
BHRBP2
01/04/07
83.7
BHRBP2
01/04/07
35.5
BHRBP2
01/04/07
26.8
BHRBP2
01/04/07
53
BHRBP2
01/04/07
59.1
F-37

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/04/07
14.8
BHRBP2
01/04/07
10
BHRBP2
01/04/07
31.6
BHRBP2
01/04/07
17.8
BHRBP2
01/04/07
21.9
BHRBP2
01/04/07
14.4
BHRBP2
01/04/07
146.2
BHRBP2
01/04/07
9.5
BHRBP2
01/04/07
62
BHRBP2
01/04/07
20
BHRBP2
01/04/07
16.7
BHRBP2
01/04/07
21
BHRBP2
01/04/07
8.5
BHRBP2
01/04/07
78.8
BHRBP2
01/04/07
19.3
BHRBP2
01/04/07
18.1
BHRBP2
01/04/07
16.2
BHRBP2
01/04/07
14
BHRBP2
01/04/07
27
BHRBP2
01/04/07
18.8
BHRBP2
01/06/07
10.2
BHRBP2
01/06/07
25.8
BHRBP2
01/06/07
18.1
BHRBP2
01/06/07
9.2
BHRBP2
01/06/07
13.8
BHRBP2
01/06/07
28.3
BHRBP2
01/06/07
18
BHRBP2
01/06/07
17.9
BHRBP2
01/06/07
10.1
BHRBP2
01/06/07
96.5
BHRBP2
01/06/07
11.1
BHRBP2
01/06/07
29.8
BHRBP2
01/06/07
27.8
BHRBP2
01/06/07
10.2
BHRBP2
01/06/07
22.6
BHRBP2
01/06/07
24.2
BHRBP2
01/06/07
21.1
BHRBP2
01/06/07
19.3
BHRBP2
01/06/07
22
BHRBP2
01/06/07
23.2
BHRBP2
01/06/07
12.8
BHRBP2
01/08/07
8
BHRBP2
01/08/07
60.2
BHRBP2
01/08/07
19
BHRBP2
01/08/07
98.7
F-38

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/08/07
23.5
BHRBP2
01/08/07
13.8
BHRBP2
01/08/07
37.1
BHRBP2
01/08/07
15.9
BHRBP2
01/08/07
25.4
BHRBP2
01/08/07
178.9
BHRBP2
01/08/07
25.8
BHRBP2
01/08/07
11.9
BHRBP2
01/08/07
21.1
BHRBP2
01/08/07
58.4
BHRBP2
01/08/07
17.2
BHRBP2
01/08/07
72.1
BHRBP2
01/08/07
13
BHRBP2
01/08/07
18.1
BHRBP2
01/08/07
98.3
BHRBP2
01/08/07
23.2
BHRBP2
01/08/07
53.2
BHRBP2
01/08/07
20.2
BHRBP2
01/08/07
15.2
BHRBP2
01/08/07
37.5
BHRBP2
01/08/07
28.8
BHRBP2
01/08/07
133.2
BHRBP2
01/08/07
21.6
BHRBP2
01/08/07
11.4
BHRBP2
01/08/07
15.4
BHRBP2
01/08/07
10.2
BHRBP2
01/09/07
57.5
BHRBP2
01/09/07
13.5
BHRBP2
01/09/07
73.3
BHRBP2
01/09/07
584.1
BHRBP2
01/09/07
67.4
BHRBP2
01/09/07
60.8
BHRBP2
01/09/07
29.1
BHRBP2
01/09/07
185.2
BHRBP2
01/09/07
61.2
BHRBP2
01/09/07
90.4
BHRBP2
01/09/07
55
BHRBP2
01/09/07
53.2
BHRBP2
01/09/07
30.4
BHRBP2
01/09/07
38.8
BHRBP2
01/09/07
45.9
BHRBP2
01/1 7/07
27.6
BHRBP2
01/1 7/07
28.1
BHRBP2
01/1 7/07
15.6
BHRBP2
01/1 7/07
20.3
F-39

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/1 7/07
38.1
BHRBP2
01/1 7/07
12.9
BHRBP2
01/1 7/07
50.3
BHRBP2
01/1 7/07
15.6
BHRBP2
01/1 7/07
58.4
BHRBP2
01/1 7/07
19
BHRBP2
01/1 7/07
26.9
BHRBP2
01/1 7/07
18.4
BHRBP2
01/1 7/07
16.3
BHRBP2
01/1 7/07
37.7
BHRBP2
01/1 7/07
52.6
BHRBP2
01/1 7/07
27.1
BHRBP2
01/1 7/07
31.1
BHRBP2
01/1 7/07
19.1
BHRBP2
01/1 7/07
39.6
BHRBP2
01/1 7/07
44.7
BHRBP2
01/1 7/07
20.8
BHRBP2
01/1 7/07
18.9
BHRBP2
01/1 7/07
11.4
BHRBP2
01/1 7/07
12.2
BHRBP2
01/1 7/07
3.7
BHRBP2
01/18/07
28.8
BHRBP2
01/18/07
43.4
BHRBP2
01/18/07
18
BHRBP2
01/18/07
32
BHRBP2
01/18/07
31.2
BHRBP2
01/18/07
21.2
BHRBP2
01/18/07
27.6
BHRBP2
01/18/07
26.8
BHRBP2
01/18/07
20.3
BHRBP2
01/18/07
46
BHRBP2
01/18/07
15.8
BHRBP2
01/18/07
41.9
BHRBP2
01/18/07
23.7
BHRBP2
01/18/07
15.2
BHRBP2
01/18/07
21.4
BHRBP2
01/18/07
11.5
BHRBP2
01/18/07
49.9
BHRBP2
01/18/07
48
BHRBP2
01/18/07
21.3
BHRBP2
01/18/07
143.8
BHRBP2
01/18/07
27.5
BHRBP2
01/18/07
12.3
BHRBP2
01/18/07
20.3
BHRBP2
02/02/07
39.1
F-40

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
02/02/07
40
BHRBP2
02/02/07
46.5
BHRBP2
02/02/07
46.5
BHRBP2
02/02/07
27.6
BHRBP2
02/02/07
31.5
BHRBP2
02/02/07
40.8
BHRBP2
02/02/07
44.4
BHRBP2
02/02/07
41.9
BHRBP2
02/02/07
60.7
BHRBP2
02/02/07
31.8
BHRBP2
02/02/07
40.7
BHRBP2
02/02/07
48.7
BHRBP2
02/02/07
71.5
BHRBP2
02/02/07
13
BHRBP2
02/02/07
35.3
BHRBP2
02/02/07
192.4
BHRBP2
02/02/07
26.5
BHRBP2
02/02/07
12.4
BHRBP2
02/08/07
21.2
BHRBP2
02/08/07
28.7
BHRBP2
02/08/07
22.9
BHRBP2
02/08/07
18.4
BHRBP2
02/08/07
33.5
BHRBP2
02/08/07
30.9
BHRBP2
02/08/07
63.8
BHRBP2
02/08/07
67.8
BHRBP2
02/08/07
59.8
BHRBP2
02/08/07
26.5
BHRBP2
02/08/07
23.5
BHRBP2
02/08/07
149.3
BHRBP2
02/08/07
72.9
BHRBP2
02/08/07
116
BHRBP2
02/08/07
107.2
BHRBP2
02/08/07
185.5
BHRBP2
02/08/07
12.5
BHRBP2
02/08/07
12.7
BHRBP2
02/15/07
38.1
BHRBP2
02/15/07
29.1
BHRBP2
02/15/07
42.8
BHRBP2
02/15/07
46.8
BHRBP2
02/15/07
41.6
BHRBP2
02/15/07
24.8
BHRBP2
02/15/07
24.2
BHRBP2
02/15/07
27.5
BHRBP2
02/15/07
33.1
F-41

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
02/15/07
69.3
BHRBP2
02/15/07
43.3
BHRBP2
02/15/07
40
BHRBP2
02/15/07
24
BHRBP2
02/15/07
29.5
BHRBP2
02/15/07
38.2
BHRBP2
02/15/07
13
BHRBP2
02/16/07
26.4
BHRBP2
02/16/07
26.4
BHRBP2
02/16/07
31.2
BHRBP2
02/16/07
30
BHRBP2
02/16/07
34.3
BHRBP2
02/16/07
12.7
BHRBP2
02/16/07
86.5
BHRBP2
02/16/07
56.7
BHRBP2
02/16/07
24
BHRBP2
02/16/07
72.4
BHRBP2
02/16/07
26.4
BHRBP2
02/16/07
20.1
BHRBP2
02/16/07
34.7
BHRBP2
02/16/07
18
BHRBP2
02/16/07
23.5
BHRBP2
03/06/07
23
BHRBP2
03/06/07
17.4
BHRBP2
03/06/07
39.3
BHRBP2
03/06/07
33.1
BHRBP2
03/06/07
130.6
BHRBP2
03/06/07
49.2
BHRBP2
03/06/07
46.4
BHRBP2
03/06/07
42.7
BHRBP2
03/06/07
75.5
BHRBP2
03/06/07
75.4
BHRBP2
03/06/07
14.1
BHRBP2
03/09/07
36.8
BHRBP2
03/09/07
27.4
BHRBP2
03/09/07
95.6
BHRBP2
03/09/07
28
BHRBP2
03/09/07
34.3
BHRBP2
03/09/07
23
BHRBP2
03/09/07
24.2
BHRBP2
03/09/07
18
BHRBP2
03/09/07
38.6
BHRBP2
03/09/07
55.2
BHRBP2
03/09/07
27.6
BHRBP2
03/09/07
23.1
F-42

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
03/09/07
157.9
BHRBP2
03/09/07
37.9
BHRBP2
03/09/07
27.6
BHRBP2
03/09/07
27
BHRBP2
03/09/07
36.8
BHRBP2
03/09/07
326.8
BHRBP2
03/09/07
198.9
BHRBP2
03/09/07
40.8
BHRBP2
03/09/07
43.2
BHRBP2
03/15/07
16.4
BHRBP2
03/15/07
38.1
BHRBP2
03/15/07
71.6
BHRBP2
03/15/07
40.2
BHRBP2
03/15/07
32.4
BHRBP2
03/15/07
27.6
BHRBP2
03/15/07
93.7
BHRBP2
03/15/07
299.4
BHRBP2
03/15/07
33.6
BHRBP2
03/15/07
45.2
BHRBP2
03/15/07
27.4
BHRBP2
03/15/07
45.1
BHRBP2
03/15/07
24.2
BHRBP2
03/15/07
17.8
BHRBP2
03/21/07
26.1
BHRBP2
03/21/07
23
BHRBP2
03/21/07
38.6
BHRBP2
03/21/07
28.6
BHRBP2
03/21/07
72.8
BHRBP2
03/21/07
42.8
BHRBP2
03/21/07
90.7
BHRBP2
03/21/07
21.8
BHRBP2
03/21/07
50.3
BHRBP2
03/21/07
54.1
BHRBP2
03/21/07
54.2
BHRBP2
03/21/07
42.9
BHRBP2
03/21/07
56.2
BHRBP2
03/21/07
30.4
BHRBP2
03/21/07
36.2
BHRBP2
03/21/07
35.8
BHRBP2
03/21/07
36.8
BHRBP2
03/23/07
40.9
BHRBP2
03/23/07
31.6
BHRBP2
03/23/07
78.4
BHRBP2
03/23/07
40.1
BHRBP2
03/23/07
184.5
F-43

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
03/23/07
19.4
BHRBP2
03/23/07
49.9
BHRBP2
03/23/07
32
BHRBP2
03/23/07
124.7
BHRBP2
03/23/07
40.9
BHRBP2
03/23/07
101
BHRBP2
03/23/07
86.1
BHRBP2
03/23/07
47.5
BHRBP2
03/23/07
144.5
BHRBP2
03/23/07
26
BHRBP2
03/26/07
41.8
BHRBP2
03/26/07
61.2
BHRBP2
03/26/07
52.9
BHRBP2
03/26/07
95.6
BHRBP2
03/26/07
65.7
BHRBP2
03/26/07
63.2
BHRBP2
03/26/07
141.5
BHRBP2
03/26/07
38
BHRBP2
03/26/07
57.2
BHRBP2
03/26/07
45.8
BHRBP2
03/26/07
106.6
BHRBP2
03/26/07
71.3
BHRBP2
03/26/07
71.9
BHRBP2
03/26/07
40
BHRBP2
03/26/07
56.7
BHRBP2
03/26/07
24.8
BHRBP2
03/26/07
40.4
BHRBP2
03/30/07
44.1
BHRBP2
03/30/07
40.8
BHRBP2
03/30/07
51.7
BHRBP2
03/30/07
50.6
BHRBP2
03/30/07
31.3
BHRBP2
03/30/07
37.6
BHRBP2
03/30/07
41.4
BHRBP2
03/30/07
49.5
BHRBP2
03/30/07
34.7
BHRBP2
03/30/07
33
BHRBP2
03/30/07
38.1
BHRBP2
03/30/07
39.3
BHRBP2
03/30/07
37
BHRBP2
03/30/07
33.9
BHRBP2
03/30/07
28
BHRBP2
03/30/07
50.1
BHRBP2
03/30/07
77.5
BHRBP2
03/30/07
378.4
F-44

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
03/30/07
31.4
BHRBP2
03/30/07
32.8
BHRBP2
03/30/07
197.1
BHRBP2
03/30/07
60.3
BHRBP2
03/30/07
23.6
BHRBP2
04/06/07
43.1
BHRBP2
04/06/07
43.3
BHRBP2
04/06/07
102.2
BHRBP2
04/06/07
37.7
BHRBP2
04/06/07
39.4
BHRBP2
04/06/07
142.2
BHRBP2
04/06/07
34
BHRBP2
04/06/07
81.2
BHRBP2
04/06/07
46.5
BHRBP2
04/06/07
47.8
BHRBP2
04/06/07
38.2
BHRBP2
04/06/07
41.4
BHRBP2
04/06/07
26
BHRBP2
04/06/07
53.3
BHRBP2
04/06/07
64.1
BHRBP2
04/06/07
52.5
BHRBP2
04/19/07
166.1
BHRBP2
04/19/07
93.9
BHRBP2
04/19/07
37.2
BHRBP2
04/19/07
37.7
BHRBP2
04/19/07
46.1
BHRBP2
04/19/07
28.7
BHRBP2
04/19/07
160.4
BHRBP2
04/19/07
10
BHRBP2
04/19/07
62.9
BHRBP2
05/24/07
90.8
BHRBP2
05/24/07
77.7
BHRBP2
05/24/07
107
BHRBP2
05/24/07
114.1
BHRBP2
05/24/07
80.8
BHRBP2
05/24/07
87.8
BHRBP2
05/24/07
73.8
BHRBP2
05/24/07
86.8
BHRBP2
05/24/07
77.2
BHRBP2
05/24/07
86.8
BHRBP2
05/24/07
78
BHRBP2
05/24/07
86.9
BHRBP2
05/24/07
74.5
BHRBP2
05/24/07
78.9
BHRBP2
05/24/07
76
F-45

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
05/24/07
89.5
BHRBP2
05/24/07
86.3
BHRBP2
05/24/07
76.6
BHRBP2
05/24/07
108.4
BHRBP2
05/24/07
68.9
BHRBP2
05/24/07
162.3
BHRBP2
05/24/07
83
BHRBP2
05/24/07
79.7
BHRBP2
05/24/07
248.9
BHRBP2
05/25/07
82
BHRBP2
05/25/07
37.8
BHRBP2
05/25/07
41.1
BHRBP2
05/25/07
140.1
BHRBP2
05/25/07
32.6
BHRBP2
05/25/07
59.2
BHRBP2
05/25/07
40.3
BHRBP2
05/25/07
39.5
BHRBP2
05/25/07
50.4
BHRBP2
05/25/07
31.1
BHRBP2
05/25/07
49.5
BHRBP2
05/25/07
40.6
BHRBP2
05/25/07
70.3
BHRBP2
05/25/07
41.5
BHRBP2
05/25/07
58.5
BHRBP2
05/25/07
84.7
BHRBP2
05/25/07
57.8
BHRBP2
05/25/07
183.3
BHRBP2
05/25/07
53.8
BHRBP2
05/25/07
56
BHRBP2
05/25/07
99.5
BHRBP2
05/25/07
55
BHRBP2
05/25/07
87.4
BHRBP2
05/25/07
56.1
BHRBP2
05/25/07
121.5
BHRBP2
05/25/07
140.3
BHRBP2
05/25/07
61.2
BHRBP2
05/25/07
119
BHRBP2
05/25/07
78.9
BHRBP2
05/25/07
73.6
BHRBP2
05/25/07
196.5
BHRBP2
05/25/07
123.3
BHRBP2
05/25/07
70.9
BHRBP2
05/25/07
66.5
BHRBP2
05/25/07
58.6
BHRBP2
05/25/07
69.9
F-46

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
05/25/07
67.6
BHRBP2
05/25/07
77.6
BHRBP2
10/18/07
85.7
BHRBP2
10/18/07
62
BHRBP2
10/18/07
62.2
BHRBP2
10/18/07
62
BHRBP2
10/18/07
65.2
BHRBP2
10/18/07
66
BHRBP2
10/18/07
68.4
BHRBP2
10/18/07
67.9
BHRBP2
10/18/07
65.9
BHRBP2
10/18/07
64.7
BHRBP2
10/18/07
68.1
BHRBP2
10/18/07
70.3
BHRBP2
10/18/07
41.4
BHRBP2
10/18/07
106.3
BHRBP2
10/19/07
159.5
BHRBP2
10/19/07
172
BHRBP2
10/19/07
168.6
BHRBP2
10/19/07
165.8
BHRBP2
10/19/07
179.2
BHRBP2
10/19/07
155.6
BHRBP2
10/19/07
136.1
BHRBP2
10/19/07
136.4
BHRBP2
10/19/07
148.5
BHRBP2
10/19/07
149.5
BHRBP2
10/19/07
153
BHRBP2
10/19/07
104.7
BHRBP2
10/19/07
84.6
BHRBP2
10/19/07
68.1
BHRBP2
10/19/07
62.6
BHRBP2
10/19/07
61
BHRBP2
10/19/07
61.7
BHRBP2
10/19/07
57.3
BHRBP2
10/19/07
43.6
BHRBP2
10/19/07
39.8
BHRBP2
10/19/07
35.1
BHRBP2
10/19/07
66.8
BHRBP2
10/23/07
74
BHRBP2
10/23/07
76.3
BHRBP2
10/23/07
83.2
BHRBP2
10/23/07
87.6
BHRBP2
10/23/07
95.4
BHRBP2
10/23/07
107.2
BHRBP2
10/23/07
119.3
F-47

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
10/23/07
124
BHRBP2
10/23/07
132.4
BHRBP2
10/23/07
135.2
BHRBP2
10/23/07
136.8
BHRBP2
10/23/07
135.4
BHRBP2
10/23/07
134.2
BHRBP2
10/23/07
129.5
BHRBP2
10/23/07
121.2
BHRBP2
10/23/07
114.1
BHRBP2
10/23/07
112.4
BHRBP2
10/23/07
114.8
BHRBP2
10/23/07
123.5
BHRBP2
10/23/07
132.3
BHRBP2
10/23/07
147.8
BHRBP2
10/23/07
156.9
BHRBP2
10/23/07
127.7
BHRBP2
10/23/07
89.1
BHRBP2
11/09/07
47.2
BHRBP2
11/09/07
16.6
BHRBP2
11/09/07
16.3
BHRBP2
11/09/07
16.1
BHRBP2
11/09/07
15.8
BHRBP2
11/09/07
15.9
BHRBP2
11/09/07
15.8
BHRBP2
11/09/07
15.4
BHRBP2
11/09/07
15.5
BHRBP2
11/09/07
15.5
BHRBP2
11/09/07
15.8
BHRBP2
11/09/07
16
BHRBP2
11/09/07
15.9
BHRBP2
11/09/07
15.7
BHRBP2
11/09/07
15.2
BHRBP2
11/09/07
15.3
BHRBP2
11/09/07
16
BHRBP2
11/09/07
50.6
BHRBP2
11/1 2/07
151.1
BHRBP2
11/1 2/07
140.6
BHRBP2
11/1 2/07
140.1
BHRBP2
11/1 2/07
134.2
BHRBP2
11/1 2/07
124.8
BHRBP2
11/1 2/07
22.4
BHRBP2
11/1 2/07
22.4
BHRBP2
11/1 2/07
22.5
BHRBP2
11/1 2/07
22.4
BHRBP2
11/1 2/07
22.5
F-48

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/1 2/07
22.3
BHRBP2
11/1 2/07
22.4
BHRBP2
11/1 2/07
22.2
BHRBP2
11/1 2/07
22.2
BHRBP2
11/1 2/07
22.3
BHRBP2
11/1 2/07
22.4
BHRBP2
11/1 2/07
4.7
BHRBP2
11/1 3/07
137.5
BHRBP2
11/1 3/07
146.7
BHRBP2
11/1 3/07
135.5
BHRBP2
11/1 3/07
129.6
BHRBP2
11/1 3/07
150.6
BHRBP2
11/1 3/07
15.1
BHRBP2
11/16/07
78.7
BHRBP2
11/16/07
79.5
BHRBP2
11/16/07
84.2
BHRBP2
11/16/07
95.2
BHRBP2
11/16/07
97.6
BHRBP2
11/16/07
94.1
BHRBP2
11/16/07
97.1
BHRBP2
11/16/07
107.8
BHRBP2
11/16/07
116
BHRBP2
11/16/07
126.6
BHRBP2
11/16/07
137.9
BHRBP2
11/16/07
141.6
BHRBP2
11/16/07
148.1
BHRBP2
11/16/07
161.3
BHRBP2
11/16/07
173.4
BHRBP2
11/16/07
177.8
BHRBP2
11/16/07
173.3
BHRBP2
11/16/07
162.4
BHRBP2
11/16/07
133.5
BHRBP2
11/16/07
16.1
BHRBP2
11/23/07
101.6
BHRBP2
11/23/07
98.3
BHRBP2
11/23/07
103.4
BHRBP2
11/23/07
111.1
BHRBP2
11/23/07
118.7
BHRBP2
11/23/07
122
BHRBP2
11/23/07
124.4
BHRBP2
11/23/07
126.9
BHRBP2
11/23/07
127.9
BHRBP2
11/23/07
129.4
BHRBP2
11/23/07
128.2
BHRBP2
11/23/07
127.1
F-49

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
11/23/07
127.9
BHRBP2
11/23/07
122.4
BHRBP2
11/23/07
106.8
BHRBP2
11/23/07
90.7
BHRBP2
11/23/07
214.9
BHRBP2
1 2/03/07
138.6
BHRBP2
1 2/03/07
154.3
BHRBP2
1 2/03/07
183.9
BHRBP2
1 2/03/07
219.6
BHRBP2
1 2/03/07
220.3
BHRBP2
1 2/03/07
219.8
BHRBP2
1 2/03/07
249.6
BHRBP2
1 2/03/07
409
BHRBP2
1 2/03/07
420.8
BHRBP2
1 2/03/07
407.7
BHRBP2
1 2/03/07
514.4
BHRBP2
1 2/03/07
611.6
BHRBP2
1 2/03/07
718.6
BHRBP2
1 2/03/07
845.3
BHRBP2
1 2/03/07
950.3
BHRBP2
1 2/03/07
929.6
BHRBP2
1 2/03/07
890.4
BHRBP2
1 2/03/07
885.1
BHRBP2
1 2/03/07
741
BHRBP2
1 2/03/07
902.3
BHRBP2
1 2/03/07
392.1
BHRBP2
1 2/03/07
606.2
BHRBP2
1 2/04/07
216.4
BHRBP2
1 2/04/07
243.9
BHRBP2
1 2/04/07
200
BHRBP2
1 2/04/07
209.9
BHRBP2
1 2/04/07
248.6
BHRBP2
1 2/04/07
188.8
BHRBP2
1 2/04/07
202.5
BHRBP2
1 2/04/07
221.8
BHRBP2
1 2/04/07
213
BHRBP2
1 2/04/07
214.9
BHRBP2
1 2/04/07
220.8
BHRBP2
1 2/04/07
193.1
BHRBP2
1 2/04/07
192.8
BHRBP2
1 2/04/07
198.6
BHRBP2
1 2/04/07
210.6
BHRBP2
1 2/04/07
213.9
BHRBP2
1 2/04/07
214.6
BHRBP2
1 2/04/07
233.2
F-50

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/04/07
234.3
BHRBP2
1 2/04/07
225.6
BHRBP2
1 2/04/07
222.6
BHRBP2
1 2/04/07
232.3
BHRBP2
1 2/04/07
222.9
BHRBP2
1 2/04/07
234.7
BHRBP2
1 2/04/07
217.6
BHRBP2
1 2/04/07
212.2
BHRBP2
1 2/04/07
220.9
BHRBP2
1 2/04/07
223
BHRBP2
1 2/04/07
184.6
BHRBP2
1 2/04/07
199
BHRBP2
1 2/04/07
188
BHRBP2
1 2/04/07
186.4
BHRBP2
1 2/04/07
181.3
BHRBP2
1 2/04/07
177.5
BHRBP2
1 2/04/07
172.7
BHRBP2
1 2/04/07
150.3
BHRBP2
1 2/04/07
137.3
BHRBP2
1 2/04/07
138.3
BHRBP2
1 2/04/07
133.8
BHRBP2
1 2/04/07
133.6
BHRBP2
1 2/04/07
130.4
BHRBP2
1 2/04/07
135
BHRBP2
1 2/04/07
144.2
BHRBP2
1 2/04/07
145.4
BHRBP2
1 2/04/07
143.3
BHRBP2
1 2/05/07
89.3
BHRBP2
1 2/05/07
69.5
BHRBP2
1 2/05/07
73.9
BHRBP2
1 2/05/07
83.4
BHRBP2
1 2/05/07
95.1
BHRBP2
1 2/05/07
79.7
BHRBP2
1 2/05/07
85.8
BHRBP2
1 2/05/07
96.9
BHRBP2
1 2/05/07
92.9
BHRBP2
1 2/05/07
75
BHRBP2
1 2/05/07
78.6
BHRBP2
1 2/05/07
93
BHRBP2
1 2/05/07
104.4
BHRBP2
1 2/05/07
82.6
BHRBP2
1 2/05/07
88.1
BHRBP2
1 2/05/07
99.7
BHRBP2
1 2/05/07
95.7
BHRBP2
1 2/05/07
78.8
F-51

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/05/07
79.4
BHRBP2
1 2/05/07
84.1
BHRBP2
1 2/05/07
121.2
BHRBP2
1 2/05/07
115.2
BHRBP2
1 2/05/07
91.6
BHRBP2
1 2/05/07
100.9
BHRBP2
1 2/05/07
110
BHRBP2
1 2/05/07
83
BHRBP2
1 2/05/07
85.2
BHRBP2
1 2/05/07
95.5
BHRBP2
1 2/05/07
131.4
BHRBP2
1 2/05/07
101.1
BHRBP2
1 2/05/07
102.6
BHRBP2
1 2/05/07
111.8
BHRBP2
1 2/05/07
143.2
BHRBP2
1 2/05/07
85.5
BHRBP2
1 2/05/07
98.7
BHRBP2
1 2/05/07
83.2
BHRBP2
1 2/05/07
95
BHRBP2
1 2/05/07
117.2
BHRBP2
1 2/05/07
128.2
BHRBP2
1 2/05/07
130.8
BHRBP2
1 2/05/07
115.7
BHRBP2
1 2/05/07
122.3
BHRBP2
1 2/05/07
188.8
BHRBP2
1 2/05/07
105.2
BHRBP2
1 2/05/07
90.7
BHRBP2
1 2/05/07
90.1
BHRBP2
1 2/05/07
97.3
BHRBP2
1 2/05/07
100.8
BHRBP2
1 2/05/07
102.5
BHRBP2
1 2/05/07
111.7
BHRBP2
1 2/05/07
111.6
BHRBP2
1 2/05/07
116
BHRBP2
1 2/05/07
99
BHRBP2
1 2/05/07
103.4
BHRBP2
1 2/05/07
93.6
BHRBP2
1 2/05/07
124.5
BHRBP2
1 2/05/07
104.1
BHRBP2
1 2/05/07
107.7
BHRBP2
1 2/05/07
157.4
BHRBP2
1 2/05/07
161.9
BHRBP2
1 2/05/07
151.2
BHRBP2
1 2/05/07
176.4
BHRBP2
1 2/05/07
206.2
F-52

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/05/07
140.5
BHRBP2
1 2/05/07
141.1
BHRBP2
1 2/05/07
125.8
BHRBP2
1 2/06/07
91.8
BHRBP2
1 2/06/07
116.1
BHRBP2
1 2/06/07
66.9
BHRBP2
1 2/06/07
68.3
BHRBP2
1 2/06/07
73.2
BHRBP2
1 2/06/07
81.8
BHRBP2
1 2/06/07
98
BHRBP2
1 2/06/07
79.8
BHRBP2
1 2/06/07
79.3
BHRBP2
1 2/06/07
83.4
BHRBP2
1 2/06/07
89.3
BHRBP2
1 2/06/07
99.2
BHRBP2
1 2/06/07
72.2
BHRBP2
1 2/06/07
65.9
BHRBP2
1 2/06/07
70.5
BHRBP2
1 2/06/07
82.3
BHRBP2
1 2/06/07
97.6
BHRBP2
1 2/06/07
90.3
BHRBP2
1 2/06/07
96
BHRBP2
1 2/06/07
76
BHRBP2
1 2/06/07
75.7
BHRBP2
1 2/06/07
93.4
BHRBP2
1 2/06/07
100.6
BHRBP2
1 2/06/07
95.7
BHRBP2
1 2/06/07
104
BHRBP2
1 2/06/07
97.5
BHRBP2
1 2/06/07
81.4
BHRBP2
1 2/06/07
93.4
BHRBP2
1 2/06/07
111.2
BHRBP2
1 2/06/07
102.5
BHRBP2
1 2/06/07
105.6
BHRBP2
1 2/06/07
108.1
BHRBP2
1 2/06/07
112.4
BHRBP2
1 2/06/07
110.4
BHRBP2
1 2/06/07
112.3
BHRBP2
1 2/06/07
117.9
BHRBP2
1 2/06/07
131.4
BHRBP2
1 2/06/07
140.1
BHRBP2
1 2/06/07
103.7
BHRBP2
1 2/06/07
107.7
BHRBP2
1 2/06/07
110.3
BHRBP2
1 2/06/07
106.5
F-53

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/06/07
99.1
BHRBP2
1 2/06/07
105.9
BHRBP2
1 2/06/07
115.8
BHRBP2
1 2/06/07
126.8
BHRBP2
1 2/06/07
109.8
BHRBP2
1 2/06/07
114.1
BHRBP2
1 2/06/07
99.5
BHRBP2
1 2/06/07
66.7
BHRBP2
1 2/06/07
71.2
BHRBP2
1 2/06/07
79.5
BHRBP2
1 2/06/07
89.8
BHRBP2
1 2/06/07
71.7
BHRBP2
1 2/06/07
77
BHRBP2
1 2/06/07
84.8
BHRBP2
1 2/06/07
76.5
BHRBP2
1 2/06/07
57.3
BHRBP2
1 2/06/07
59.3
BHRBP2
1 2/06/07
69.2
BHRBP2
1 2/06/07
91.8
BHRBP2
1 2/06/07
59.8
BHRBP2
1 2/06/07
61.6
BHRBP2
1 2/06/07
64.4
BHRBP2
1 2/06/07
65.7
BHRBP2
1 2/06/07
58.8
BHRBP2
1 2/06/07
61.3
BHRBP2
1 2/06/07
70.2
BHRBP2
1 2/06/07
89.7
BHRBP2
1 2/06/07
74.4
BHRBP2
1 2/06/07
82.5
BHRBP2
1 2/06/07
75.4
BHRBP2
1 2/06/07
59.9
BHRBP2
1 2/06/07
62.4
BHRBP2
1 2/06/07
68.4
BHRBP2
1 2/06/07
71.4
BHRBP2
1 2/06/07
76.3
BHRBP2
1 2/06/07
77.5
BHRBP2
1 2/06/07
72.9
BHRBP2
1 2/06/07
88.9
BHRBP2
1 2/06/07
74
BHRBP2
1 2/06/07
80.7
BHRBP2
1 2/06/07
84.2
BHRBP2
1 2/06/07
68.2
BHRBP2
1 2/06/07
81.9
BHRBP2
1 2/06/07
97.4
BHRBP2
1 2/06/07
78.3
F-54

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/06/07
85.5
BHRBP2
1 2/06/07
79.6
BHRBP2
1 2/06/07
68.7
BHRBP2
1 2/06/07
76.7
BHRBP2
1 2/06/07
94.4
BHRBP2
1 2/06/07
76.8
BHRBP2
1 2/06/07
78.1
BHRBP2
1 2/06/07
84.2
BHRBP2
1 2/06/07
88.7
BHRBP2
1 2/07/07
100.3
BHRBP2
1 2/07/07
106.8
BHRBP2
1 2/07/07
103.6
BHRBP2
1 2/07/07
117
BHRBP2
1 2/07/07
120.6
BHRBP2
1 2/07/07
108.9
BHRBP2
1 2/07/07
101.6
BHRBP2
1 2/07/07
111.6
BHRBP2
1 2/07/07
118.7
BHRBP2
1 2/07/07
116.3
BHRBP2
1 2/07/07
124.1
BHRBP2
1 2/07/07
129
BHRBP2
1 2/07/07
126
BHRBP2
1 2/07/07
136.4
BHRBP2
1 2/07/07
119.6
BHRBP2
1 2/07/07
114.7
BHRBP2
1 2/07/07
117.7
BHRBP2
1 2/07/07
125.1
BHRBP2
1 2/07/07
122.6
BHRBP2
1 2/07/07
106.6
BHRBP2
1 2/07/07
129.5
BHRBP2
1 2/07/07
123.5
BHRBP2
1 2/07/07
126.8
BHRBP2
1 2/07/07
112.1
BHRBP2
1 2/07/07
93.9
BHRBP2
1 2/07/07
104.4
BHRBP2
1 2/07/07
121.1
BHRBP2
1 2/07/07
120.7
BHRBP2
1 2/07/07
119.8
BHRBP2
1 2/07/07
121.2
BHRBP2
1 2/07/07
111.1
BHRBP2
1 2/07/07
76.4
BHRBP2
1 2/07/07
77.1
BHRBP2
1 2/07/07
95.9
BHRBP2
1 2/07/07
130.6
BHRBP2
1 2/07/07
183.2
F-55

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/07/07
118.8
BHRBP2
1 2/07/07
94.9
BHRBP2
1 2/07/07
100.3
BHRBP2
1 2/07/07
105
BHRBP2
1 2/07/07
109.9
BHRBP2
1 2/07/07
109
BHRBP2
1 2/07/07
100.8
BHRBP2
1 2/07/07
99.8
BHRBP2
1 2/07/07
104
BHRBP2
1 2/07/07
113.3
BHRBP2
1 2/07/07
119.2
BHRBP2
1 2/07/07
88.4
BHRBP2
1 2/07/07
63.4
BHRBP2
1 2/07/07
66.5
BHRBP2
1 2/07/07
69.1
BHRBP2
1 2/07/07
94.4
BHRBP2
1 2/07/07
93.5
BHRBP2
1 2/10/07
100.4
BHRBP2
1 2/10/07
102
BHRBP2
1 2/10/07
110.2
BHRBP2
1 2/10/07
117.8
BHRBP2
1 2/10/07
124.5
BHRBP2
1 2/10/07
125.9
BHRBP2
1 2/10/07
145.3
BHRBP2
1 2/10/07
161.4
BHRBP2
1 2/10/07
156.2
BHRBP2
1 2/10/07
151.6
BHRBP2
1 2/10/07
152
BHRBP2
1 2/10/07
160.2
BHRBP2
1 2/10/07
166.5
BHRBP2
1 2/10/07
137.9
BHRBP2
1 2/10/07
127.3
BHRBP2
1 2/10/07
106.7
BHRBP2
1 2/10/07
137.4
BHRBP2
1 2/10/07
149.8
BHRBP2
1 2/10/07
152.9
BHRBP2
1 2/10/07
157.4
BHRBP2
1 2/10/07
163.9
BHRBP2
1 2/10/07
169.4
BHRBP2
1 2/10/07
164.7
BHRBP2
1 2/10/07
107.8
BHRBP2
1 2/10/07
122.4
BHRBP2
1 2/10/07
182.2
BHRBP2
1 2/10/07
162.9
BHRBP2
1 2/10/07
7.7
F-56

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
12/11/07
50
BHRBP2
12/11/07
51.1
BHRBP2
12/11/07
53
BHRBP2
12/11/07
54.4
BHRBP2
12/11/07
58.2
BHRBP2
12/11/07
64.2
BHRBP2
12/11/07
71.2
BHRBP2
12/11/07
75.5
BHRBP2
12/11/07
81.7
BHRBP2
12/11/07
88.5
BHRBP2
12/11/07
92.2
BHRBP2
12/11/07
95.4
BHRBP2
12/11/07
100.2
BHRBP2
12/11/07
103.9
BHRBP2
12/11/07
105.6
BHRBP2
12/11/07
103.7
BHRBP2
12/11/07
99
BHRBP2
12/11/07
99
BHRBP2
12/11/07
129.1
BHRBP2
1 2/19/07
132.5
BHRBP2
1 2/19/07
141.1
BHRBP2
1 2/19/07
139.6
BHRBP2
1 2/19/07
145.9
BHRBP2
1 2/19/07
148.1
BHRBP2
1 2/19/07
133.1
BHRBP2
1 2/19/07
139.5
BHRBP2
1 2/19/07
153.2
BHRBP2
1 2/19/07
160.8
BHRBP2
1 2/19/07
159.2
BHRBP2
1 2/19/07
167.9
BHRBP2
1 2/19/07
180.7
BHRBP2
1 2/19/07
167.3
BHRBP2
1 2/19/07
165.5
BHRBP2
1 2/19/07
159.7
BHRBP2
1 2/19/07
157.2
BHRBP2
1 2/19/07
164.9
BHRBP2
1 2/19/07
180.7
BHRBP2
1 2/19/07
167.9
BHRBP2
1 2/19/07
167.9
BHRBP2
1 2/19/07
147.1
BHRBP2
1 2/20/07
102.4
BHRBP2
1 2/20/07
102.8
BHRBP2
1 2/20/07
108.3
BHRBP2
1 2/20/07
109
BHRBP2
1 2/20/07
112.5
F-57

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
1 2/20/07
115.7
BHRBP2
1 2/20/07
115.9
BHRBP2
1 2/20/07
110.2
BHRBP2
1 2/20/07
108.1
BHRBP2
1 2/20/07
108
BHRBP2
1 2/20/07
86.7
BHRBP2
1 2/20/07
230.9
BHRBP2
1 2/26/07
134.4
BHRBP2
1 2/26/07
130.2
BHRBP2
1 2/26/07
120.4
BHRBP2
1 2/26/07
111.3
BHRBP2
1 2/26/07
103.5
BHRBP2
1 2/26/07
105.9
BHRBP2
1 2/26/07
108.6
BHRBP2
1 2/26/07
111.9
BHRBP2
1 2/26/07
115.9
BHRBP2
1 2/26/07
118.3
BHRBP2
1 2/26/07
119.3
BHRBP2
1 2/26/07
117.8
BHRBP2
1 2/26/07
115.5
BHRBP2
1 2/26/07
113.2
BHRBP2
1 2/26/07
102.3
BHRBP2
1 2/26/07
92.2
BHRBP2
1 2/26/07
84.7
BHRBP2
1 2/26/07
69.9
BHRBP2
1 2/26/07
57.7
BHRBP2
1 2/26/07
45.5
BHRBP2
1 2/26/07
118
BHRBP2
12/27/07
154.3
BHRBP2
12/27/07
113.9
BHRBP2
12/27/07
115.8
BHRBP2
12/27/07
119
BHRBP2
12/27/07
118.4
BHRBP2
12/27/07
118.9
BHRBP2
12/27/07
117.7
BHRBP2
12/27/07
115.4
BHRBP2
12/27/07
113.5
BHRBP2
12/27/07
105.7
BHRBP2
12/27/07
100.3
BHRBP2
12/27/07
97.1
BHRBP2
12/27/07
103.2
BHRBP2
12/27/07
110
BHRBP2
12/27/07
111.3
BHRBP2
12/27/07
111.9
BHRBP2
12/27/07
115
F-58

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
12/27/07
114.9
BHRBP2
12/27/07
111.4
BHRBP2
12/27/07
110.6
BHRBP2
12/27/07
108.3
BHRBP2
12/27/07
102.1
BHRBP2
12/27/07
117.8
BHRBP2
12/27/07
401.8
BHRBP2
01/03/08
67.9
BHRBP2
01/03/08
65.6
BHRBP2
01/03/08
75
BHRBP2
01/03/08
107.8
BHRBP2
01/03/08
128.3
BHRBP2
01/03/08
83.4
BHRBP2
01/03/08
57.6
BHRBP2
01/03/08
57.6
BHRBP2
01/03/08
58.8
BHRBP2
01/03/08
118.8
BHRBP2
01/03/08
11.7
BHRBP2
01/04/08
71.3
BHRBP2
01/04/08
81.7
BHRBP2
01/04/08
82
BHRBP2
01/04/08
66.7
BHRBP2
01/04/08
101.8
BHRBP2
01/04/08
107.2
BHRBP2
01/04/08
117.4
BHRBP2
01/04/08
95.3
BHRBP2
01/04/08
92.2
BHRBP2
01/04/08
114.2
BHRBP2
01/04/08
116.9
BHRBP2
01/04/08
86.8
BHRBP2
01/04/08
66.8
BHRBP2
01/04/08
53.1
BHRBP2
01/04/08
9.1
BHRBP2
01/04/08
9.3
BHRBP2
01/04/08
11.2
BHRBP2
01/04/08
12.6
BHRBP2
01/05/08
147.9
BHRBP2
01/05/08
105.9
BHRBP2
01/05/08
109.2
BHRBP2
01/05/08
117.6
BHRBP2
01/05/08
120.1
BHRBP2
01/05/08
122.1
BHRBP2
01/05/08
113.4
BHRBP2
01/05/08
106.8
BHRBP2
01/05/08
103.7
F-59

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/05/08
98.3
BHRBP2
01/05/08
92.4
BHRBP2
01/05/08
92
BHRBP2
01/05/08
97.7
BHRBP2
01/05/08
101
BHRBP2
01/05/08
101.6
BHRBP2
01/05/08
88
BHRBP2
01/05/08
63.3
BHRBP2
01/05/08
40.8
BHRBP2
01/05/08
51.6
BHRBP2
01/05/08
7.9
BHRBP2
01/08/08
98.5
BHRBP2
01/08/08
99.8
BHRBP2
01/08/08
101.6
BHRBP2
01/08/08
102.5
BHRBP2
01/08/08
103.9
BHRBP2
01/08/08
107.3
BHRBP2
01/08/08
108.3
BHRBP2
01/08/08
111.6
BHRBP2
01/08/08
113.5
BHRBP2
01/08/08
114.6
BHRBP2
01/08/08
116.2
BHRBP2
01/08/08
117.4
BHRBP2
01/08/08
116.3
BHRBP2
01/08/08
115.6
BHRBP2
01/08/08
119.5
BHRBP2
01/08/08
112.2
BHRBP2
01/08/08
107.8
BHRBP2
01/08/08
103.6
BHRBP2
01/08/08
100
BHRBP2
01/08/08
95.1
BHRBP2
01/08/08
93
BHRBP2
01/08/08
76
BHRBP2
01/08/08
66.6
BHRBP2
01/08/08
65
BHRBP2
01/08/08
64.4
BHRBP2
01/08/08
64.3
BHRBP2
01/08/08
103.6
BHRBP2
01/16/08
95.5
BHRBP2
01/16/08
101.5
BHRBP2
01/16/08
109
BHRBP2
01/16/08
111
BHRBP2
01/16/08
112.6
BHRBP2
01/16/08
113.9
BHRBP2
01/16/08
109.6
F-60

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/16/08
103.2
BHRBP2
01/16/08
110.6
BHRBP2
01/16/08
113.9
BHRBP2
01/16/08
115.2
BHRBP2
01/16/08
115.9
BHRBP2
01/16/08
116.9
BHRBP2
01/16/08
117.8
BHRBP2
01/16/08
118.6
BHRBP2
01/16/08
119.6
BHRBP2
01/16/08
121
BHRBP2
01/16/08
122.6
BHRBP2
01/16/08
124
BHRBP2
01/16/08
125.7
BHRBP2
01/16/08
126.3
BHRBP2
01/16/08
126.3
BHRBP2
01/16/08
123.5
BHRBP2
01/16/08
119.8
BHRBP2
01/16/08
117.8
BHRBP2
01/16/08
115.7
BHRBP2
01/16/08
111.3
BHRBP2
01/16/08
106.4
BHRBP2
01/16/08
100.7
BHRBP2
01/16/08
94.8
BHRBP2
01/16/08
89.7
BHRBP2
01/16/08
83
BHRBP2
01/16/08
81.8
BHRBP2
01/16/08
81.5
BHRBP2
01/16/08
79.9
BHRBP2
01/16/08
75.9
BHRBP2
01/16/08
70.4
BHRBP2
01/16/08
64.4
BHRBP2
01/16/08
57.6
BHRBP2
01/16/08
135.6
BHRBP2
01/16/08
9.4
BHRBP2
01/30/08
48.1
BHRBP2
01/30/08
51
BHRBP2
01/30/08
54
BHRBP2
01/30/08
53.3
BHRBP2
01/30/08
49.7
BHRBP2
01/30/08
44.2
BHRBP2
01/30/08
45.5
BHRBP2
01/30/08
48.2
BHRBP2
01/30/08
50.4
BHRBP2
01/30/08
53.8
BHRBP2
01/30/08
57.4
F-61

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
01/30/08
58.4
BHRBP2
01/30/08
59.3
BHRBP2
01/30/08
59.9
BHRBP2
01/30/08
61.1
BHRBP2
01/30/08
61.6
BHRBP2
01/30/08
62.4
BHRBP2
01/30/08
63.3
BHRBP2
01/30/08
64
BHRBP2
01/30/08
63.5
BHRBP2
01/30/08
61.5
BHRBP2
01/30/08
58.3
BHRBP2
01/30/08
54.3
BHRBP2
01/30/08
66.5
BHRBP2
01/30/08
10
BHRBP2
01/31/08
74.6
BHRBP2
01/31/08
58.2
BHRBP2
01/31/08
58
BHRBP2
01/31/08
55.6
BHRBP2
01/31/08
59.2
BHRBP2
01/31/08
58.1
BHRBP2
01/31/08
44.9
BHRBP2
01/31/08
41.8
BHRBP2
01/31/08
41.8
BHRBP2
01/31/08
25.7
BHRBP2
01/31/08
22.4
BHRBP2
01/31/08
53.1
BHRBP2
01/31/08
8
BHRBP2
01/31/08
8.4
BHRBP2
02/07/08
88.7
BHRBP2
02/07/08
90
BHRBP2
02/07/08
91.4
BHRBP2
02/07/08
91.1
BHRBP2
02/07/08
90.8
BHRBP2
02/07/08
92.2
BHRBP2
02/07/08
94.3
BHRBP2
02/07/08
94.4
BHRBP2
02/07/08
93
BHRBP2
02/07/08
90.5
BHRBP2
02/07/08
90.9
BHRBP2
02/07/08
88.2
BHRBP2
02/07/08
82.2
BHRBP2
02/07/08
73
BHRBP2
02/07/08
71.2
BHRBP2
02/07/08
74
BHRBP2
02/07/08
80.2
F-62

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
02/07/08
86.8
BHRBP2
02/07/08
82.2
BHRBP2
02/07/08
79.6
BHRBP2
02/07/08
62.9
BHRBP2
02/07/08
56.4
BHRBP2
02/07/08
44.6
BHRBP2
02/07/08
33.9
BHRBP2
02/07/08
28.9
BHRBP2
02/07/08
53.9
BHRBP2
02/07/08
10.2
BHRBP2
02/18/08
56.3
BHRBP2
02/18/08
56.8
BHRBP2
02/18/08
56.2
BHRBP2
02/18/08
56.8
BHRBP2
02/18/08
57.3
BHRBP2
02/18/08
56.6
BHRBP2
02/18/08
56.2
BHRBP2
02/18/08
56
BHRBP2
02/18/08
55.5
BHRBP2
02/18/08
53.5
BHRBP2
02/18/08
52.3
BHRBP2
02/18/08
51.9
BHRBP2
02/18/08
49.6
BHRBP2
02/18/08
46.5
BHRBP2
02/18/08
43.7
BHRBP2
02/18/08
38.1
BHRBP2
02/18/08
32.2
BHRBP2
02/18/08
28.2
BHRBP2
02/18/08
23
BHRBP2
02/18/08
110.6
BHRBP2
02/19/08
55.6
BHRBP2
02/19/08
37.4
BHRBP2
02/19/08
38.1
BHRBP2
02/19/08
38.9
BHRBP2
02/19/08
39.7
BHRBP2
02/19/08
39.3
BHRBP2
02/19/08
39.2
BHRBP2
02/19/08
39.1
BHRBP2
02/19/08
38.8
BHRBP2
02/19/08
38.6
BHRBP2
02/19/08
38.2
BHRBP2
02/19/08
37.3
BHRBP2
02/19/08
36.6
BHRBP2
02/19/08
35.9
BHRBP2
02/19/08
59.5
F-63

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
02/19/08
76.5
BHRBP2
03/07/08
60.1
BHRBP2
03/07/08
62.5
BHRBP2
03/07/08
64.3
BHRBP2
03/07/08
65.6
BHRBP2
03/07/08
67.2
BHRBP2
03/07/08
68.1
BHRBP2
03/07/08
68.4
BHRBP2
03/07/08
68.8
BHRBP2
03/07/08
69.5
BHRBP2
03/07/08
70
BHRBP2
03/07/08
70
BHRBP2
03/07/08
70.4
BHRBP2
03/07/08
70.4
BHRBP2
03/07/08
74.6
BHRBP2
03/07/08
71.6
BHRBP2
03/07/08
73.1
BHRBP2
03/07/08
73
BHRBP2
03/07/08
74.5
BHRBP2
03/07/08
74.4
BHRBP2
03/07/08
72.6
BHRBP2
03/07/08
74.1
BHRBP2
03/07/08
69.4
BHRBP2
03/07/08
67.1
BHRBP2
03/07/08
64.4
BHRBP2
03/07/08
64.8
BHRBP2
03/07/08
55.9
BHRBP2
03/07/08
62.3
BHRBP2
03/07/08
54.9
BHRBP2
03/07/08
125.2
BHRBP2
03/07/08
8.3
BHRBP2
03/07/08
8
BHRBP2
03/14/08
88.2
BHRBP2
03/14/08
94.8
BHRBP2
03/14/08
98.8
BHRBP2
03/14/08
102.4
BHRBP2
03/14/08
100.9
BHRBP2
03/14/08
101
BHRBP2
03/14/08
97.6
BHRBP2
03/14/08
95.7
BHRBP2
03/14/08
92
BHRBP2
03/14/08
89.3
BHRBP2
03/14/08
91.1
BHRBP2
03/14/08
101.6
BHRBP2
03/14/08
99.9
F-64

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
03/14/08
101
BHRBP2
03/14/08
105.8
BHRBP2
03/14/08
108.9
BHRBP2
03/14/08
110.7
BHRBP2
03/14/08
113
BHRBP2
03/14/08
113.8
BHRBP2
03/14/08
116.1
BHRBP2
03/14/08
121.9
BHRBP2
03/14/08
131.1
BHRBP2
03/14/08
137.1
BHRBP2
03/14/08
141.5
BHRBP2
03/14/08
147.7
BHRBP2
03/14/08
148
BHRBP2
03/14/08
142.1
BHRBP2
03/14/08
134.1
BHRBP2
03/14/08
125.9
BHRBP2
03/14/08
124.5
BHRBP2
03/14/08
112.5
BHRBP2
03/14/08
116.6
BHRBP2
03/14/08
128.5
BHRBP2
03/14/08
113.5
BHRBP2
03/14/08
5.2
BHRBP2
03/14/08
5
BHRBP2
03/18/08
65.7
BHRBP2
03/18/08
64.1
BHRBP2
03/18/08
61.9
BHRBP2
03/18/08
59.5
BHRBP2
03/18/08
56.1
BHRBP2
03/18/08
57.4
BHRBP2
03/18/08
61.2
BHRBP2
03/18/08
64.9
BHRBP2
03/18/08
66.9
BHRBP2
03/18/08
68.9
BHRBP2
03/18/08
71.6
BHRBP2
03/18/08
73.6
BHRBP2
03/18/08
74.2
BHRBP2
03/18/08
73.8
BHRBP2
03/18/08
71.7
BHRBP2
03/18/08
68.6
BHRBP2
03/18/08
66
BHRBP2
03/18/08
61.9
BHRBP2
03/18/08
52.7
BHRBP2
03/18/08
43.5
BHRBP2
03/18/08
43.5
BHRBP2
03/18/08
142
F-65

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
03/20/08
24.2
BHRBP2
03/20/08
27.7
BHRBP2
03/20/08
27.9
BHRBP2
03/20/08
28.1
BHRBP2
03/20/08
28.4
BHRBP2
03/20/08
28.9
BHRBP2
03/20/08
29.2
BHRBP2
03/20/08
29.9
BHRBP2
03/20/08
31.3
BHRBP2
03/20/08
71.2
BHRBP2
03/20/08
32.2
BHRBP2
03/20/08
32.6
BHRBP2
03/20/08
33.2
BHRBP2
03/20/08
33.4
BHRBP2
03/20/08
33.7
BHRBP2
03/20/08
33.8
BHRBP2
03/20/08
33.4
BHRBP2
03/20/08
32.3
BHRBP2
03/20/08
30.9
BHRBP2
03/20/08
28.6
BHRBP2
03/20/08
26.2
BHRBP2
03/20/08
56
BHRBP2
03/20/08
3.3
BHRBP2
03/21/08
32.1
BHRBP2
03/21/08
31.2
BHRBP2
03/21/08
29.4
BHRBP2
03/21/08
28
BHRBP2
03/21/08
27.4
BHRBP2
03/21/08
27.6
BHRBP2
03/21/08
27.8
BHRBP2
03/21/08
28
BHRBP2
03/21/08
28.1
BHRBP2
03/21/08
28.1
BHRBP2
03/21/08
28.4
BHRBP2
03/21/08
28.2
BHRBP2
03/21/08
28.1
BHRBP2
03/21/08
28
BHRBP2
03/21/08
27.7
BHRBP2
03/21/08
27.4
BHRBP2
03/21/08
26.9
BHRBP2
03/21/08
26.2
BHRBP2
03/21/08
26.1
BHRBP2
03/21/08
25.9
BHRBP2
03/21/08
25.6
BHRBP2
03/21/08
25.3
F-66

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
03/21/08
24.4
BHRBP2
03/21/08
23.2
BHRBP2
03/21/08
22.1
BHRBP2
03/21/08
21.5
BHRBP2
03/21/08
20.7
BHRBP2
03/21/08
20.2
BHRBP2
03/21/08
19.6
BHRBP2
03/21/08
54.9
BHRBP2
04/08/08
10.3
BHRBP2
04/08/08
10.4
BHRBP2
04/08/08
10.9
BHRBP2
04/08/08
12.7
BHRBP2
04/08/08
12.8
BHRBP2
04/08/08
49.2
BHRBP2
04/08/08
29.2
BHRBP2
04/09/08
52.9
BHRBP2
04/09/08
53.5
BHRBP2
04/09/08
56.8
BHRBP2
04/09/08
57.2
BHRBP2
04/09/08
54.1
BHRBP2
04/09/08
50.6
BHRBP2
04/09/08
48.4
BHRBP2
04/09/08
47.1
BHRBP2
04/09/08
46.6
BHRBP2
04/09/08
45.5
BHRBP2
04/09/08
43.8
BHRBP2
04/09/08
42.6
BHRBP2
04/09/08
41.3
BHRBP2
04/09/08
40.8
BHRBP2
04/09/08
40
BHRBP2
04/09/08
39.4
BHRBP2
04/09/08
39.3
BHRBP2
04/09/08
40.6
BHRBP2
04/09/08
43.1
BHRBP2
04/09/08
46.1
BHRBP2
04/09/08
49.6
BHRBP2
04/09/08
54.5
BHRBP2
04/09/08
59.6
BHRBP2
04/09/08
66.7
BHRBP2
04/09/08
72.6
BHRBP2
04/09/08
84.4
BHRBP2
04/09/08
58.8
BHRBP2
04/09/08
35.3
BHRBP2
04/09/08
35.3
BHRBP2
04/09/08
33.9
F-67

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
04/09/08
25.5
BHRBP2
04/10/08
41.9
BHRBP2
04/10/08
41.7
BHRBP2
04/10/08
41.4
BHRBP2
04/10/08
41.1
BHRBP2
04/10/08
40.6
BHRBP2
04/10/08
39.9
BHRBP2
04/10/08
39.2
BHRBP2
04/10/08
38.6
BHRBP2
04/10/08
38.4
BHRBP2
04/10/08
38
BHRBP2
04/10/08
37.2
BHRBP2
04/10/08
36.5
BHRBP2
04/10/08
36.8
BHRBP2
04/10/08
36
BHRBP2
04/10/08
35.6
BHRBP2
04/10/08
35.2
BHRBP2
04/10/08
34.9
BHRBP2
04/10/08
35.3
BHRBP2
04/10/08
34.9
BHRBP2
04/10/08
37.5
BHRBP2
04/10/08
37.9
BHRBP2
04/10/08
38.3
BHRBP2
04/10/08
39
BHRBP2
04/10/08
48.2
BHRBP2
04/11/08
39.9
BHRBP2
04/11/08
39.3
BHRBP2
04/11/08
39.2
BHRBP2
04/11/08
39.1
BHRBP2
04/11/08
39
BHRBP2
04/11/08
38.5
BHRBP2
04/11/08
38.3
BHRBP2
04/11/08
38.5
BHRBP2
04/11/08
38.2
BHRBP2
04/11/08
38
BHRBP2
04/11/08
38
BHRBP2
04/11/08
37.9
BHRBP2
04/11/08
37.9
BHRBP2
04/11/08
37.9
BHRBP2
04/11/08
38
BHRBP2
04/11/08
37.9
BHRBP2
04/11/08
37.6
BHRBP2
04/11/08
37.7
BHRBP2
04/11/08
37.2
BHRBP2
04/11/08
37
F-68

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
04/11/08
37
BHRBP2
04/11/08
36.9
BHRBP2
04/11/08
36.9
BHRBP2
04/11/08
37
BHRBP2
04/11/08
36.9
BHRBP2
04/11/08
36.9
BHRBP2
04/11/08
37.7
BHRBP2
04/11/08
37.8
BHRBP2
04/11/08
37.8
BHRBP2
04/11/08
38.3
BHRBP2
04/11/08
38.7
BHRBP2
04/11/08
38.9
BHRBP2
04/11/08
51.4
BHRBP2
04/14/08
28.8
BHRBP2
04/14/08
28.8
BHRBP2
04/14/08
28.7
BHRBP2
04/14/08
28.3
BHRBP2
04/14/08
27.9
BHRBP2
04/14/08
28.1
BHRBP2
04/14/08
27.7
BHRBP2
04/14/08
27.7
BHRBP2
04/14/08
27.4
BHRBP2
04/14/08
26.6
BHRBP2
04/14/08
26.5
BHRBP2
04/14/08
26.8
BHRBP2
04/14/08
27.4
BHRBP2
04/14/08
28.2
BHRBP2
04/14/08
30.3
BHRBP2
04/14/08
31
BHRBP2
04/14/08
37.3
BHRBP2
04/14/08
40.4
BHRBP2
04/15/08
38.2
BHRBP2
04/15/08
38.2
BHRBP2
04/15/08
37.8
BHRBP2
04/15/08
36.5
BHRBP2
04/15/08
35.7
BHRBP2
04/15/08
34.8
BHRBP2
04/15/08
34.4
BHRBP2
04/15/08
33.9
BHRBP2
04/15/08
33.3
BHRBP2
04/15/08
33.3
BHRBP2
04/15/08
33.3
BHRBP2
04/15/08
32.9
BHRBP2
04/15/08
32.3
BHRBP2
04/15/08
31.4
F-69

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
04/15/08
31.1
BHRBP2
04/15/08
30.8
BHRBP2
04/15/08
30.7
BHRBP2
04/15/08
29.9
BHRBP2
04/15/08
28.7
BHRBP2
04/15/08
28.2
BHRBP2
04/15/08
28.2
BHRBP2
04/15/08
27.9
BHRBP2
04/15/08
27.9
BHRBP2
04/15/08
27.6
BHRBP2
04/15/08
27.6
BHRBP2
04/15/08
27.6
BHRBP2
04/15/08
29.4
BHRBP2
04/15/08
34
BHRBP2
04/16/08
41.5
BHRBP2
04/16/08
40.4
BHRBP2
04/16/08
41.1
BHRBP2
04/16/08
47.5
BHRBP2
04/16/08
40.9
BHRBP2
04/16/08
40.4
BHRBP2
04/16/08
39.5
BHRBP2
04/16/08
38.8
BHRBP2
04/16/08
37.7
BHRBP2
04/16/08
36.7
BHRBP2
04/16/08
35.8
BHRBP2
04/16/08
34.3
BHRBP2
04/16/08
33.7
BHRBP2
04/16/08
33.7
BHRBP2
04/16/08
33.2
BHRBP2
04/16/08
33.1
BHRBP2
04/16/08
33.2
BHRBP2
04/16/08
33.2
BHRBP2
04/16/08
33.2
BHRBP2
04/16/08
33.3
BHRBP2
04/16/08
50.7
BHRBP2
04/1 7/08
22.8
BHRBP2
04/1 7/08
39.7
BHRBP2
04/1 7/08
37.4
BHRBP2
04/1 7/08
33.1
BHRBP2
04/1 7/08
30.9
BHRBP2
04/1 7/08
30.9
BHRBP2
04/1 7/08
30.8
BHRBP2
04/1 7/08
30.9
BHRBP2
04/1 7/08
31.3
BHRBP2
04/1 7/08
31.4
F-70

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
04/1 7/08
31.4
BHRBP2
04/1 7/08
31.4
BHRBP2
04/1 7/08
31.3
BHRBP2
04/1 7/08
31.5
BHRBP2
04/1 7/08
31.8
BHRBP2
04/1 7/08
32.7
BHRBP2
04/1 7/08
33.4
BHRBP2
04/1 7/08
34
BHRBP2
04/1 7/08
35.2
BHRBP2
04/1 7/08
36
BHRBP2
04/1 7/08
45
BHRBP2
04/1 7/08
31.4
BHRBP2
04/1 7/08
31.6
BHRBP2
04/1 7/08
22.6
BHRBP2
04/1 7/08
27.2
BHRBP2
04/22/08
38
BHRBP2
04/22/08
38
BHRBP2
04/22/08
37.8
BHRBP2
04/22/08
37.1
BHRBP2
04/22/08
36.9
BHRBP2
04/22/08
36.9
BHRBP2
04/22/08
37
BHRBP2
04/22/08
37
BHRBP2
04/22/08
37.1
BHRBP2
04/22/08
37.9
BHRBP2
04/22/08
38
BHRBP2
04/22/08
37
BHRBP2
04/22/08
36.5
BHRBP2
04/22/08
37.6
BHRBP2
04/22/08
39
BHRBP2
04/22/08
41.5
BHRBP2
04/22/08
44.3
BHRBP2
04/22/08
33.8
BHRBP2
04/22/08
33.7
BHRBP2
04/22/08
33.3
BHRBP2
04/22/08
32.8
BHRBP2
04/22/08
32.3
BHRBP2
04/22/08
31.3
BHRBP2
04/22/08
35.4
BHRBP2
04/23/08
55
BHRBP2
04/23/08
55.1
BHRBP2
04/23/08
55.1
BHRBP2
04/23/08
55.4
BHRBP2
04/23/08
55
BHRBP2
04/23/08
54.7
F-71

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
04/23/08
54.3
BHRBP2
04/23/08
53.2
BHRBP2
04/23/08
51.6
BHRBP2
04/23/08
49.7
BHRBP2
04/23/08
47.5
BHRBP2
04/23/08
44.9
BHRBP2
04/23/08
66.4
BHRBP2
04/23/08
136.3
BHRBP2
04/28/08
109.8
BHRBP2
04/28/08
115.9
BHRBP2
04/28/08
125.8
BHRBP2
04/28/08
134.6
BHRBP2
04/28/08
132.7
BHRBP2
04/28/08
128.8
BHRBP2
04/28/08
127.4
BHRBP2
04/28/08
110.5
BHRBP2
04/28/08
106.9
BHRBP2
04/28/08
104.6
BHRBP2
04/28/08
101.9
BHRBP2
04/28/08
97.6
BHRBP2
04/28/08
94.3
BHRBP2
04/28/08
91.2
BHRBP2
04/28/08
87.8
BHRBP2
04/28/08
84.6
BHRBP2
04/28/08
81.9
BHRBP2
04/28/08
79.4
BHRBP2
04/28/08
77.2
BHRBP2
04/28/08
76
BHRBP2
04/28/08
74.8
BHRBP2
04/28/08
72.7
BHRBP2
04/28/08
70.9
BHRBP2
04/28/08
67.9
BHRBP2
04/28/08
65.4
BHRBP2
04/28/08
63.1
BHRBP2
04/28/08
60.1
BHRBP2
04/28/08
54.2
BHRBP2
04/28/08
41
BHRBP2
04/29/08
169.6
BHRBP2
04/29/08
145
BHRBP2
04/29/08
137.3
BHRBP2
04/29/08
128.9
BHRBP2
04/29/08
128.1
BHRBP2
04/29/08
120.4
BHRBP2
04/29/08
114.4
BHRBP2
04/29/08
106
F-72

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BHRBP2
04/29/08
147
BHRBP2
04/29/08
112.1
BHRBP2
04/29/08
114.5
BHRBP2
04/29/08
386.7
BHRBP2
04/29/08
154.8
BHRBP2
04/29/08
90.6
BHRBP2
04/29/08
82
BHRBP2
04/29/08
92
BHRBP2
04/29/08
92.7
BHRBP2
04/29/08
93.7
BHRBP2
04/29/08
94.5
BHRBP2
04/29/08
94.6
BHRBP2
04/29/08
95.8
BHRBP2
04/29/08
98.1
BHRBP2
04/29/08
100.5
BHRBP2
04/29/08
101.1
BHRBP2
04/29/08
100.5
BHRBP2
04/29/08
98.9
BHRBP2
04/29/08
95.6
BHRBP2
04/29/08
106.3
BWWTP
01/06/07
284
BWWTP
01/06/07
165.1
BWWTP
01/06/07
157.7
BWWTP
01/06/07
158.1
BWWTP
01/06/07
163
BWWTP
01/06/07
156.2
BWWTP
01/06/07
161
BWWTP
01/06/07
159.7
BWWTP
01/06/07
152.8
BWWTP
01/06/07
163
BWWTP
01/06/07
141.7
BWWTP
01/06/07
137.7
BWWTP
01/06/07
143.3
BWWTP
01/06/07
151.7
BWWTP
01/06/07
164.3
BWWTP
01/06/07
155.9
BWWTP
01/06/07
139.2
BWWTP
01/06/07
136.8
BWWTP
01/06/07
144.5
BWWTP
01/06/07
153.9
BWWTP
01/06/07
150.3
BWWTP
01/06/07
135
BWWTP
01/06/07
131.2
BWWTP
01/06/07
142.6
BWWTP
01/06/07
144.3
F-73

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BWWTP
01/06/07
149.5
BWWTP
01/06/07
149.8
BWWTP
01/06/07
132.1
BWWTP
01/06/07
211.9
BWWTP
01/06/07
2.7
BWWTP
01/08/07
3.6
BWWTP
01/08/07
144.9
BWWTP
01/08/07
140.4
BWWTP
01/08/07
148.9
BWWTP
01/08/07
146.6
BWWTP
01/08/07
140.3
BWWTP
01/08/07
145.9
BWWTP
01/08/07
135.4
BWWTP
01/08/07
143.5
BWWTP
01/08/07
133.8
BWWTP
01/08/07
158.4
BWWTP
01/08/07
150.4
BWWTP
01/08/07
153.1
BWWTP
01/08/07
170.8
BWWTP
01/08/07
170.6
BWWTP
01/08/07
175.5
BWWTP
01/08/07
169.4
BWWTP
01/08/07
171.2
BWWTP
01/08/07
156.5
BWWTP
01/08/07
140.4
BWWTP
01/08/07
135.1
BWWTP
01/08/07
120.5
BWWTP
01/09/07
4.6
BWWTP
01/09/07
180.3
BWWTP
01/09/07
135.8
BWWTP
01/09/07
117.8
BWWTP
01/09/07
123.6
BWWTP
01/09/07
129.3
BWWTP
01/09/07
113.9
BWWTP
01/09/07
107.4
BWWTP
01/09/07
108.3
BWWTP
01/09/07
170.5
BWWTP
01/09/07
119.7
BWWTP
01/09/07
122.4
BWWTP
01/09/07
128.9
BWWTP
01/09/07
136.6
BWWTP
01/09/07
133
BWWTP
01/09/07
128.5
BWWTP
01/09/07
135.5
BWWTP
01/09/07
136
F-74

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
BWWTP
01/09/07
131.9
BWWTP
01/09/07
139.7
BWWTP
01/09/07
136.1
BWWTP
01/09/07
130
BWWTP
01/09/07
132.5
BWWTP
01/09/07
126.8
BWWTP
01/09/07
114.2
BWWTP
01/09/07
113.8
BWWTP
01/09/07
99.5
BWWTP
02/09/07
17.1
BWWTP
02/09/07
13.5
BWWTP
02/09/07
25.2
BWWTP
03/02/07
11.6
BWWTP
03/02/07
13.8
BWWTP
03/21/07
62
BWWTP
03/21/07
64.1
BWWTP
03/21/07
61.5
BWWTP
03/21/07
53.9
BWWTP
03/21/07
44.9
BWWTP
03/21/07
24.7
BWWTP
03/21/07
7.2
BWWTP
03/21/07
5.9
BWWTP
03/21/07
37.2
BWWTP
05/11/07
39.4
BWWTP
05/11/07
34
BWWTP
05/11/07
32.5
BWWTP
05/11/07
37.3
BWWTP
05/11/07
20.5
BWWTP
05/11/07
16.5
BWWTP
05/11/07
19.3
BWWTP
05/11/07
37.3
BWWTP
05/14/07
37.6
BWWTP
05/14/07
35.8
BWWTP
05/14/07
8.6
KC1.1
1 2/02/07
40.6
KC1.1
1 2/02/07
42.5
KC1.1
1 2/02/07
39.8
KC1.1
1 2/02/07
37.5
KC1.1
1 2/02/07
39.1
KC1.1
1 2/02/07
45.3
KC1.1
1 2/02/07
43.1
KC1.1
1 2/02/07
40.8
KC1.1
1 2/02/07
36.4
KC1.1
1 2/02/07
34.6
KC1.1
1 2/02/07
36.5
F-75

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/02/07
38.8
KC1.1
1 2/02/07
35.9
KC1.1
1 2/02/07
38.9
KC1.1
1 2/02/07
43.9
KC1.1
1 2/02/07
46.2
KC1.1
1 2/02/07
46.6
KC1.1
1 2/02/07
43.6
KC1.1
1 2/02/07
52.1
KC1.1
1 2/02/07
50
KC1.1
1 2/02/07
44.3
KC1.1
1 2/02/07
47.4
KC1.1
1 2/02/07
48.9
KC1.1
1 2/02/07
48.2
KC1.1
1 2/02/07
46
KC1.1
1 2/02/07
44.2
KC1.1
1 2/02/07
36.8
KC1.1
1 2/02/07
40.7
KC1.1
1 2/02/07
44.9
KC1.1
1 2/02/07
46.5
KC1.1
1 2/02/07
46.7
KC1.1
1 2/02/07
44.3
KC1.1
1 2/02/07
40.9
KC1.1
1 2/02/07
38.8
KC1.1
1 2/02/07
42.5
KC1.1
1 2/02/07
48.2
KC1.1
1 2/02/07
58.1
KC1.1
1 2/02/07
57.8
KC1.1
1 2/02/07
58
KC1.1
1 2/02/07
63.7
KC1.1
1 2/02/07
78.6
KC1.1
1 2/02/07
93
KC1.1
1 2/02/07
54.1
KC1.1
1 2/02/07
45.9
KC1.1
1 2/02/07
51.2
KC1.1
1 2/02/07
56
KC1.1
1 2/02/07
57.3
KC1.1
1 2/02/07
55.7
KC1.1
1 2/02/07
50.5
KC1.1
1 2/02/07
42.8
KC1.1
1 2/02/07
32.5
KC1.1
1 2/02/07
20.5
KC1.1
1 2/02/07
16.9
KC1.1
1 2/02/07
17.3
KC1.1
1 2/02/07
17.8
KC1.1
1 2/02/07
10.9
F-76

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/02/07
66.1
KC1.1
1 2/03/07
67
KC1.1
1 2/03/07
69.7
KC1.1
1 2/03/07
69.9
KC1.1
1 2/03/07
67.4
KC1.1
1 2/03/07
66.3
KC1.1
1 2/03/07
68.9
KC1.1
1 2/03/07
74.7
KC1.1
1 2/03/07
76.8
KC1.1
1 2/03/07
78
KC1.1
1 2/03/07
74
KC1.1
1 2/03/07
72.9
KC1.1
1 2/03/07
75.4
KC1.1
1 2/03/07
77.3
KC1.1
1 2/03/07
77.9
KC1.1
1 2/03/07
79.8
KC1.1
1 2/03/07
83
KC1.1
1 2/03/07
86.5
KC1.1
1 2/03/07
86.1
KC1.1
1 2/03/07
87.3
KC1.1
1 2/03/07
85.9
KC1.1
1 2/03/07
89.3
KC1.1
1 2/03/07
91.5
KC1.1
1 2/03/07
92.8
KC1.1
1 2/03/07
91.8
KC1.1
1 2/03/07
97.5
KC1.1
1 2/03/07
97.3
KC1.1
1 2/03/07
97.2
KC1.1
1 2/03/07
102.1
KC1.1
1 2/03/07
105.1
KC1.1
1 2/03/07
107.8
KC1.1
1 2/03/07
99.9
KC1.1
1 2/03/07
102.6
KC1.1
1 2/03/07
106.2
KC1.1
1 2/03/07
108.2
KC1.1
1 2/03/07
108.4
KC1.1
1 2/03/07
106.7
KC1.1
1 2/03/07
110.3
KC1.1
1 2/03/07
115.9
KC1.1
1 2/03/07
110.7
KC1.1
1 2/03/07
109.8
KC1.1
1 2/03/07
110.2
KC1.1
1 2/03/07
112.8
KC1.1
1 2/03/07
115
KC1.1
1 2/03/07
118.4
F-77

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/03/07
121.5
KC1.1
1 2/03/07
123.4
KC1.1
1 2/03/07
120.9
KC1.1
1 2/03/07
124.8
KC1.1
1 2/03/07
129.1
KC1.1
1 2/03/07
134.8
KC1.1
1 2/03/07
129.4
KC1.1
1 2/03/07
128.4
KC1.1
1 2/03/07
128.6
KC1.1
1 2/03/07
131.3
KC1.1
1 2/03/07
134.6
KC1.1
1 2/03/07
137.3
KC1.1
1 2/03/07
142.3
KC1.1
1 2/03/07
141.4
KC1.1
1 2/03/07
139.9
KC1.1
1 2/03/07
139.1
KC1.1
1 2/03/07
141.9
KC1.1
1 2/03/07
146.6
KC1.1
1 2/03/07
146.9
KC1.1
1 2/03/07
138
KC1.1
1 2/03/07
129.4
KC1.1
1 2/03/07
132.2
KC1.1
1 2/03/07
133.8
KC1.1
1 2/03/07
120
KC1.1
1 2/03/07
102.3
KC1.1
1 2/03/07
87.2
KC1.1
1 2/03/07
88.1
KC1.1
1 2/03/07
90.5
KC1.1
1 2/03/07
97.1
KC1.1
1 2/03/07
84.9
KC1.1
1 2/03/07
70.6
KC1.1
1 2/03/07
62.2
KC1.1
1 2/03/07
62.6
KC1.1
1 2/03/07
64.9
KC1.1
1 2/03/07
66.7
KC1.1
1 2/03/07
64.5
KC1.1
1 2/03/07
56.8
KC1.1
1 2/03/07
49.8
KC1.1
1 2/03/07
50
KC1.1
1 2/03/07
53
KC1.1
1 2/03/07
52.2
KC1.1
1 2/03/07
47.7
KC1.1
1 2/03/07
41.3
KC1.1
1 2/03/07
41.1
KC1.1
1 2/03/07
41.9
F-78

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/03/07
44.3
KC1.1
1 2/03/07
222.7
KC1.1
1 2/03/07
30.3
KC1.1
1 2/03/07
30.1
KC1.1
1 2/03/07
40.7
KC1.1
1 2/04/07
59.4
KC1.1
1 2/04/07
58.4
KC1.1
1 2/04/07
62.7
KC1.1
1 2/04/07
64.9
KC1.1
1 2/04/07
62.4
KC1.1
1 2/04/07
59
KC1.1
1 2/04/07
58
KC1.1
1 2/04/07
61.3
KC1.1
1 2/04/07
64.6
KC1.1
1 2/04/07
65.4
KC1.1
1 2/04/07
62.4
KC1.1
1 2/04/07
61.3
KC1.1
1 2/04/07
64.2
KC1.1
1 2/04/07
66.8
KC1.1
1 2/04/07
66
KC1.1
1 2/04/07
62.3
KC1.1
1 2/04/07
63.7
KC1.1
1 2/04/07
67.4
KC1.1
1 2/04/07
65.5
KC1.1
1 2/04/07
62.6
KC1.1
1 2/04/07
63.1
KC1.1
1 2/04/07
65.7
KC1.1
1 2/04/07
68.9
KC1.1
1 2/04/07
69.9
KC1.1
1 2/04/07
67.5
KC1.1
1 2/04/07
64.5
KC1.1
1 2/04/07
67
KC1.1
1 2/04/07
69.6
KC1.1
1 2/04/07
72
KC1.1
1 2/04/07
66.7
KC1.1
1 2/04/07
62.6
KC1.1
1 2/04/07
67.2
KC1.1
1 2/04/07
71.2
KC1.1
1 2/04/07
69.7
KC1.1
1 2/04/07
66.2
KC1.1
1 2/04/07
81.4
KC1.1
1 2/04/07
63.3
KC1.1
1 2/04/07
66.2
KC1.1
1 2/04/07
63.8
KC1.1
1 2/04/07
62.2
F-79

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/04/07
63.1
KC1.1
1 2/04/07
65.3
KC1.1
1 2/04/07
65.7
KC1.1
1 2/04/07
63.1
KC1.1
1 2/04/07
63.6
KC1.1
1 2/04/07
67.4
KC1.1
1 2/04/07
69.4
KC1.1
1 2/04/07
66.7
KC1.1
1 2/04/07
62.9
KC1.1
1 2/04/07
68.8
KC1.1
1 2/04/07
65.5
KC1.1
1 2/04/07
64.7
KC1.1
1 2/04/07
62
KC1.1
1 2/04/07
63
KC1.1
1 2/04/07
66.2
KC1.1
1 2/04/07
66.9
KC1.1
1 2/04/07
64.9
KC1.1
1 2/04/07
62
KC1.1
1 2/04/07
63.3
KC1.1
1 2/04/07
65.1
KC1.1
1 2/04/07
63.9
KC1.1
1 2/04/07
62.6
KC1.1
1 2/04/07
65.3
KC1.1
1 2/04/07
67.3
KC1.1
1 2/04/07
67.1
KC1.1
1 2/04/07
65.6
KC1.1
1 2/04/07
64
KC1.1
1 2/04/07
65.8
KC1.1
1 2/04/07
68.3
KC1.1
1 2/04/07
69.2
KC1.1
1 2/04/07
67.3
KC1.1
1 2/04/07
65.2
KC1.1
1 2/04/07
67.2
KC1.1
1 2/04/07
70.2
KC1.1
1 2/04/07
69.9
KC1.1
1 2/04/07
68.8
KC1.1
1 2/04/07
70.1
KC1.1
1 2/04/07
70.7
KC1.1
1 2/04/07
66.5
KC1.1
1 2/04/07
68.6
KC1.1
1 2/04/07
69.7
KC1.1
1 2/04/07
67.6
KC1.1
1 2/04/07
66.4
KC1.1
1 2/04/07
68.5
KC1.1
1 2/04/07
68.6
F-80

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/04/07
66.1
KC1.1
1 2/04/07
66.5
KC1.1
1 2/04/07
67.8
KC1.1
1 2/04/07
64.2
KC1.1
1 2/04/07
65.7
KC1.1
1 2/04/07
301.7
KC1.1
1 2/04/07
53
KC1.1
1 2/04/07
69.1
KC1.1
1 2/05/07
44.3
KC1.1
1 2/05/07
48.2
KC1.1
1 2/05/07
49.7
KC1.1
1 2/05/07
46.9
KC1.1
1 2/05/07
43.9
KC1.1
1 2/05/07
47
KC1.1
1 2/05/07
50
KC1.1
1 2/05/07
48.9
KC1.1
1 2/05/07
46.3
KC1.1
1 2/05/07
48.7
KC1.1
1 2/05/07
49.6
KC1.1
1 2/05/07
47.7
KC1.1
1 2/05/07
47.1
KC1.1
1 2/05/07
49.9
KC1.1
1 2/05/07
50.4
KC1.1
1 2/05/07
48.3
KC1.1
1 2/05/07
49.6
KC1.1
1 2/05/07
53.5
KC1.1
1 2/05/07
55.9
KC1.1
1 2/05/07
54.7
KC1.1
1 2/05/07
53.9
KC1.1
1 2/05/07
57.6
KC1.1
1 2/05/07
60.8
KC1.1
1 2/05/07
59.6
KC1.1
1 2/05/07
57.5
KC1.1
1 2/05/07
60.8
KC1.1
1 2/05/07
63.4
KC1.1
1 2/05/07
62.7
KC1.1
1 2/05/07
59.8
KC1.1
1 2/05/07
59.9
KC1.1
1 2/05/07
64.2
KC1.1
1 2/05/07
66.1
KC1.1
1 2/05/07
63.1
KC1.1
1 2/05/07
61.4
KC1.1
1 2/05/07
63.3
KC1.1
1 2/05/07
67
KC1.1
1 2/05/07
68.5
F-81

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/05/07
67.7
KC1.1
1 2/05/07
68.9
KC1.1
1 2/05/07
73.6
KC1.1
1 2/05/07
76.4
KC1.1
1 2/05/07
76.7
KC1.1
1 2/05/07
72.6
KC1.1
1 2/05/07
74.5
KC1.1
1 2/05/07
80.1
KC1.1
1 2/05/07
82.7
KC1.1
1 2/05/07
81.5
KC1.1
1 2/05/07
79.4
KC1.1
1 2/05/07
82.6
KC1.1
1 2/05/07
85.1
KC1.1
1 2/05/07
84.9
KC1.1
1 2/05/07
87.4
KC1.1
1 2/05/07
92.9
KC1.1
1 2/05/07
97.7
KC1.1
1 2/05/07
98.6
KC1.1
1 2/05/07
98.2
KC1.1
1 2/05/07
99.4
KC1.1
1 2/05/07
104.3
KC1.1
1 2/05/07
105.1
KC1.1
1 2/05/07
100
KC1.1
1 2/05/07
97.3
KC1.1
1 2/05/07
102.4
KC1.1
1 2/05/07
104.4
KC1.1
1 2/05/07
99.7
KC1.1
1 2/05/07
91.8
KC1.1
1 2/05/07
83.3
KC1.1
1 2/05/07
86.7
KC1.1
1 2/05/07
93.4
KC1.1
1 2/05/07
94.9
KC1.1
1 2/05/07
90.9
KC1.1
1 2/05/07
85.9
KC1.1
1 2/05/07
75.1
KC1.1
1 2/05/07
72.2
KC1.1
1 2/05/07
77.4
KC1.1
1 2/05/07
82.1
KC1.1
1 2/05/07
79
KC1.1
1 2/05/07
72.8
KC1.1
1 2/05/07
64.4
KC1.1
1 2/05/07
65.6
KC1.1
1 2/05/07
69.7
KC1.1
1 2/05/07
69.2
KC1.1
1 2/05/07
62.4
F-82

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/05/07
60.3
KC1.1
1 2/05/07
64.5
KC1.1
1 2/05/07
65.4
KC1.1
1 2/05/07
62.4
KC1.1
1 2/05/07
63.3
KC1.1
1 2/05/07
67.5
KC1.1
1 2/05/07
69.4
KC1.1
1 2/05/07
65.6
KC1.1
1 2/05/07
55.3
KC1.1
1 2/05/07
62
KC1.1
1 2/05/07
136.5
KC1.1
1 2/05/07
61.4
KC1.1
1 2/06/07
50.1
KC1.1
1 2/06/07
47.5
KC1.1
1 2/06/07
45.7
KC1.1
1 2/06/07
38.5
KC1.1
1 2/06/07
41.7
KC1.1
1 2/06/07
44.4
KC1.1
1 2/06/07
45.3
KC1.1
1 2/06/07
43
KC1.1
1 2/06/07
40.8
KC1.1
1 2/06/07
44.2
KC1.1
1 2/06/07
49
KC1.1
1 2/06/07
52
KC1.1
1 2/06/07
49.9
KC1.1
1 2/06/07
45.8
KC1.1
1 2/06/07
39
KC1.1
1 2/06/07
36.7
KC1.1
1 2/06/07
39.6
KC1.1
1 2/06/07
42.9
KC1.1
1 2/06/07
45.7
KC1.1
1 2/06/07
44.3
KC1.1
1 2/06/07
41.5
KC1.1
1 2/06/07
41.4
KC1.1
1 2/06/07
45.9
KC1.1
1 2/06/07
51.8
KC1.1
1 2/06/07
52.6
KC1.1
1 2/06/07
47.7
KC1.1
1 2/06/07
45.4
KC1.1
1 2/06/07
34.9
KC1.1
1 2/06/07
33.6
KC1.1
1 2/06/07
37.9
KC1.1
1 2/06/07
41.5
KC1.1
1 2/06/07
43.4
KC1.1
1 2/06/07
42.7
F-83

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/06/07
39.8
KC1.1
1 2/06/07
35.7
KC1.1
1 2/06/07
38.8
KC1.1
1 2/06/07
44.1
KC1.1
1 2/06/07
48.8
KC1.1
1 2/06/07
52.4
KC1.1
1 2/06/07
54.4
KC1.1
1 2/06/07
52.8
KC1.1
1 2/06/07
49.8
KC1.1
1 2/06/07
52.7
KC1.1
1 2/06/07
57.1
KC1.1
1 2/06/07
62.5
KC1.1
1 2/06/07
71.4
KC1.1
1 2/06/07
79.1
KC1.1
1 2/06/07
88.2
KC1.1
1 2/06/07
99.5
KC1.1
1 2/06/07
113.6
KC1.1
1 2/06/07
124.9
KC1.1
1 2/06/07
126.9
KC1.1
1 2/06/07
136.8
KC1.1
1 2/06/07
157.5
KC1.1
1 2/06/07
179.1
KC1.1
1 2/06/07
207
KC1.1
1 2/06/07
223.2
KC1.1
1 2/06/07
229.3
KC1.1
1 2/06/07
278.1
KC1.1
1 2/06/07
304.8
KC1.1
1 2/06/07
339.1
KC1.1
1 2/06/07
362.6
KC1.1
1 2/06/07
347.6
KC1.1
1 2/06/07
351.8
KC1.1
1 2/06/07
355.7
KC1.1
1 2/06/07
365.2
KC1.1
1 2/06/07
358.2
KC1.1
1 2/06/07
338.4
KC1.1
1 2/06/07
270.1
KC1.1
1 2/06/07
239
KC1.1
1 2/06/07
282.8
KC1.1
1 2/06/07
169.7
KC1.1
1 2/06/07
113.7
KC1.1
1 2/06/07
87.3
KC1.1
1 2/06/07
85.6
KC1.1
1 2/06/07
74
KC1.1
1 2/06/07
60
KC1.1
1 2/06/07
52.9
F-84

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/06/07
61.1
KC1.1
1 2/06/07
66.1
KC1.1
1 2/06/07
66.6
KC1.1
1 2/06/07
61
KC1.1
1 2/06/07
55.5
KC1.1
1 2/06/07
60.8
KC1.1
1 2/06/07
64.7
KC1.1
1 2/06/07
60.9
KC1.1
1 2/06/07
56.8
KC1.1
1 2/06/07
60.3
KC1.1
1 2/06/07
61.7
KC1.1
1 2/06/07
55.9
KC1.1
1 2/06/07
46.4
KC1.1
1 2/06/07
50.8
KC1.1
1 2/06/07
135.1
KC1.1
1 2/06/07
106.4
KC1.1
1 2/06/07
43.1
KC1.1
1 2/07/07
53.7
KC1.1
1 2/07/07
54.2
KC1.1
1 2/07/07
51.1
KC1.1
1 2/07/07
45.1
KC1.1
1 2/07/07
40.8
KC1.1
1 2/07/07
38.6
KC1.1
1 2/07/07
41.2
KC1.1
1 2/07/07
45.1
KC1.1
1 2/07/07
50.6
KC1.1
1 2/07/07
54.5
KC1.1
1 2/07/07
52.2
KC1.1
1 2/07/07
46.4
KC1.1
1 2/07/07
41.6
KC1.1
1 2/07/07
38.9
KC1.1
1 2/07/07
41.4
KC1.1
1 2/07/07
46.5
KC1.1
1 2/07/07
49.9
KC1.1
1 2/07/07
39.9
KC1.1
1 2/07/07
31.9
KC1.1
1 2/07/07
25.2
KC1.1
1 2/07/07
22.8
KC1.1
1 2/07/07
50.9
KC1.1
1 2/07/07
40.6
KC1.1
1 2/07/07
42.9
KC1.1
1 2/07/07
44.3
KC1.1
1 2/07/07
40.4
KC1.1
1 2/07/07
40.3
KC1.1
1 2/07/07
39.8
F-85

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/07/07
45.7
KC1.1
1 2/07/07
122.9
KC1.1
1 2/07/07
56.5
KC1.1
1 2/07/07
43.3
KC1.1
1 2/07/07
69.9
KC1.1
1 2/07/07
116.9
KC1.1
1 2/07/07
44.6
KC1.1
1 2/07/07
47.8
KC1.1
1 2/07/07
45.6
KC1.1
1 2/07/07
40.5
KC1.1
1 2/07/07
37.2
KC1.1
1 2/07/07
36
KC1.1
1 2/07/07
38
KC1.1
1 2/07/07
38.5
KC1.1
1 2/07/07
43.2
KC1.1
1 2/07/07
250.2
KC1.1
1 2/07/07
51.6
KC1.1
1 2/07/07
52.3
KC1.1
1 2/08/07
57.1
KC1.1
1 2/08/07
61.2
KC1.1
1 2/08/07
67.4
KC1.1
1 2/08/07
69.5
KC1.1
1 2/08/07
63.4
KC1.1
1 2/08/07
55.8
KC1.1
1 2/08/07
48.9
KC1.1
1 2/08/07
44
KC1.1
1 2/08/07
45.3
KC1.1
1 2/08/07
50
KC1.1
1 2/08/07
53.4
KC1.1
1 2/08/07
58.8
KC1.1
1 2/08/07
56.6
KC1.1
1 2/08/07
48.5
KC1.1
1 2/08/07
39.3
KC1.1
1 2/08/07
33.8
KC1.1
1 2/08/07
33.4
KC1.1
1 2/08/07
34.3
KC1.1
1 2/08/07
35.9
KC1.1
1 2/08/07
46
KC1.1
1 2/08/07
21.8
KC1.1
1 2/08/07
46.4
KC1.1
1 2/08/07
48.1
KC1.1
12/11/07
50.7
KC1.1
12/11/07
51.3
KC1.1
12/11/07
45.8
KC1.1
12/11/07
38.2
F-86

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
12/11/07
33.7
KC1.1
12/11/07
43.6
KC1.1
12/11/07
39.7
KC1.1
12/11/07
44.1
KC1.1
12/11/07
46.4
KC1.1
12/11/07
49.4
KC1.1
12/11/07
39
KC1.1
12/11/07
36.2
KC1.1
12/11/07
37.9
KC1.1
12/11/07
38.8
KC1.1
12/11/07
38.8
KC1.1
12/11/07
40.2
KC1.1
12/11/07
35.5
KC1.1
12/11/07
25.5
KC1.1
12/11/07
24.9
KC1.1
12/11/07
21.5
KC1.1
12/11/07
40.4
KC1.1
12/11/07
164.8
KC1.1
12/11/07
38.6
KC1.1
12/11/07
35.5
KC1.1
12/11/07
37.3
KC1.1
12/11/07
38.7
KC1.1
12/11/07
40
KC1.1
12/11/07
38.5
KC1.1
12/11/07
36.3
KC1.1
12/11/07
38.1
KC1.1
12/11/07
40.7
KC1.1
12/11/07
39.9
KC1.1
12/11/07
35.7
KC1.1
12/11/07
35.4
KC1.1
12/11/07
34.8
KC1.1
12/11/07
28.3
KC1.1
12/11/07
24.1
KC1.1
12/11/07
28.2
KC1.1
12/11/07
119.1
KC1.1
12/11/07
145.2
KC1.1
12/11/07
10.3
KC1.1
1 2/1 2/07
43.8
KC1.1
1 2/1 2/07
44.4
KC1.1
1 2/1 2/07
46
KC1.1
1 2/1 2/07
50.7
KC1.1
1 2/1 2/07
56.5
KC1.1
1 2/1 2/07
57.8
KC1.1
1 2/1 2/07
56.5
KC1.1
1 2/1 2/07
53.2
F-87

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/1 2/07
48.2
KC1.1
1 2/1 2/07
45
KC1.1
1 2/1 2/07
42.2
KC1.1
1 2/1 2/07
46.7
KC1.1
1 2/1 2/07
53.9
KC1.1
1 2/1 2/07
59.7
KC1.1
1 2/1 2/07
62
KC1.1
1 2/1 2/07
61.4
KC1.1
1 2/1 2/07
57.7
KC1.1
1 2/1 2/07
55.7
KC1.1
1 2/1 2/07
50.2
KC1.1
1 2/1 2/07
44
KC1.1
1 2/1 2/07
42.9
KC1.1
1 2/1 2/07
47.4
KC1.1
1 2/1 2/07
47.7
KC1.1
1 2/1 2/07
44.5
KC1.1
1 2/1 2/07
35.7
KC1.1
1 2/1 2/07
80
KC1.1
1 2/1 2/07
35.3
KC1.1
1 2/1 2/07
36
KC1.1
1 2/1 2/07
57.1
KC1.1
1 2/1 2/07
44.9
KC1.1
1 2/1 2/07
44.1
KC1.1
1 2/18/07
12
KC1.1
1 2/18/07
31.7
KC1.1
1 2/19/07
39
KC1.1
1 2/19/07
35.6
KC1.1
1 2/19/07
43.8
KC1.1
1 2/19/07
50
KC1.1
1 2/19/07
50.8
KC1.1
1 2/19/07
49.5
KC1.1
1 2/19/07
44.6
KC1.1
1 2/19/07
37.6
KC1.1
1 2/19/07
34.4
KC1.1
1 2/19/07
34.5
KC1.1
1 2/19/07
28.5
KC1.1
1 2/19/07
32
KC1.1
1 2/19/07
35.9
KC1.1
1 2/19/07
36.7
KC1.1
1 2/19/07
36.8
KC1.1
1 2/19/07
33.8
KC1.1
1 2/19/07
28.8
KC1.1
1 2/19/07
31.3
KC1.1
1 2/19/07
35.2
KC1.1
1 2/19/07
38.8
F-88

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/19/07
40.1
KC1.1
1 2/19/07
40.9
KC1.1
1 2/19/07
41.2
KC1.1
1 2/19/07
39.7
KC1.1
1 2/19/07
38.9
KC1.1
1 2/19/07
35.3
KC1.1
1 2/19/07
27
KC1.1
1 2/19/07
24.5
KC1.1
1 2/19/07
19.9
KC1.1
1 2/19/07
19.7
KC1.1
1 2/19/07
20
KC1.1
1 2/19/07
43.4
KC1.1
1 2/19/07
38.9
KC1.1
1 2/19/07
31.7
KC1.1
1 2/19/07
28.7
KC1.1
1 2/19/07
27
KC1.1
1 2/19/07
18.9
KC1.1
1 2/19/07
13.7
KC1.1
1 2/19/07
12.1
KC1.1
1 2/19/07
11.2
KC1.1
1 2/19/07
10.9
KC1.1
1 2/19/07
29.6
KC1.1
1 2/19/07
34.1
KC1.1
1 2/20/07
45.1
KC1.1
1 2/20/07
43.9
KC1.1
1 2/20/07
40.8
KC1.1
1 2/20/07
38.5
KC1.1
1 2/20/07
37.6
KC1.1
1 2/20/07
36.5
KC1.1
1 2/20/07
35.7
KC1.1
1 2/20/07
38.1
KC1.1
1 2/20/07
42.8
KC1.1
1 2/20/07
46
KC1.1
1 2/20/07
46.3
KC1.1
1 2/20/07
46.1
KC1.1
1 2/20/07
43.5
KC1.1
1 2/20/07
38.6
KC1.1
1 2/20/07
38.9
KC1.1
1 2/20/07
36
KC1.1
1 2/20/07
39.1
KC1.1
1 2/20/07
43.4
KC1.1
1 2/20/07
41.3
KC1.1
1 2/20/07
39.9
KC1.1
1 2/20/07
40.2
KC1.1
1 2/20/07
39.3
F-89

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/20/07
44.2
KC1.1
1 2/20/07
46.4
KC1.1
1 2/20/07
43.2
KC1.1
1 2/20/07
40.5
KC1.1
1 2/20/07
42.5
KC1.1
1 2/20/07
44.1
KC1.1
1 2/20/07
42.4
KC1.1
1 2/20/07
42.5
KC1.1
1 2/20/07
44.6
KC1.1
1 2/20/07
47.5
KC1.1
1 2/20/07
44.7
KC1.1
1 2/20/07
41.1
KC1.1
1 2/20/07
42.5
KC1.1
1 2/20/07
46.8
KC1.1
1 2/20/07
48.6
KC1.1
1 2/20/07
44
KC1.1
1 2/20/07
44.1
KC1.1
1 2/20/07
48.2
KC1.1
1 2/20/07
49.9
KC1.1
1 2/20/07
47.7
KC1.1
1 2/20/07
42.6
KC1.1
1 2/20/07
43
KC1.1
1 2/20/07
43.9
KC1.1
1 2/20/07
63.6
KC1.1
1 2/20/07
46.3
KC1.1
1 2/20/07
44.2
KC1.1
1 2/20/07
47.3
KC1.1
1 2/20/07
51.7
KC1.1
1 2/20/07
55
KC1.1
1 2/20/07
51.8
KC1.1
1 2/20/07
50.9
KC1.1
1 2/20/07
57.1
KC1.1
1 2/20/07
58.4
KC1.1
1 2/20/07
64
KC1.1
1 2/20/07
56.6
KC1.1
1 2/20/07
55.4
KC1.1
1 2/20/07
58.1
KC1.1
1 2/20/07
61
KC1.1
1 2/20/07
61.3
KC1.1
1 2/20/07
53.3
KC1.1
1 2/20/07
55.9
KC1.1
1 2/20/07
57.7
KC1.1
1 2/20/07
53.8
KC1.1
1 2/20/07
54
KC1.1
1 2/20/07
59
F-90

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/20/07
62.8
KC1.1
1 2/20/07
61
KC1.1
1 2/20/07
55.4
KC1.1
1 2/20/07
50.5
KC1.1
1 2/20/07
50.3
KC1.1
1 2/20/07
54.6
KC1.1
1 2/20/07
60.9
KC1.1
1 2/20/07
60.7
KC1.1
1 2/20/07
54.7
KC1.1
1 2/20/07
54.3
KC1.1
1 2/20/07
56.4
KC1.1
1 2/20/07
61
KC1.1
1 2/20/07
58.6
KC1.1
1 2/20/07
52.8
KC1.1
1 2/20/07
49.6
KC1.1
1 2/20/07
51.6
KC1.1
1 2/20/07
59.6
KC1.1
1 2/20/07
60.8
KC1.1
1 2/20/07
55.5
KC1.1
1 2/20/07
45
KC1.1
1 2/20/07
37.3
KC1.1
1 2/20/07
35.8
KC1.1
1 2/20/07
39.4
KC1.1
1 2/20/07
44.2
KC1.1
1 2/20/07
65.4
KC1.1
1 2/20/07
51.9
KC1.1
1 2/20/07
48.8
KC1.1
12/23/07
32.4
KC1.1
12/23/07
34.4
KC1.1
12/23/07
39.2
KC1.1
12/23/07
40.8
KC1.1
12/23/07
41
KC1.1
12/23/07
40.4
KC1.1
12/23/07
91.2
KC1.1
12/23/07
34.2
KC1.1
12/23/07
35.4
KC1.1
12/23/07
43.2
KC1.1
12/23/07
42.3
KC1.1
12/23/07
40.2
KC1.1
12/23/07
41
KC1.1
12/23/07
43.9
KC1.1
12/23/07
40.7
KC1.1
12/23/07
34.6
KC1.1
12/23/07
34.8
KC1.1
12/23/07
40
F-91

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
12/23/07
41
KC1.1
12/23/07
40.7
KC1.1
12/23/07
39.9
KC1.1
12/23/07
36.6
KC1.1
12/23/07
30.4
KC1.1
12/23/07
24.1
KC1.1
12/23/07
19.4
KC1.1
12/23/07
17.6
KC1.1
12/23/07
60.5
KC1.1
12/23/07
40.8
KC1.1
12/23/07
38.5
KC1.1
12/23/07
34.3
KC1.1
12/23/07
33.8
KC1.1
12/23/07
34.6
KC1.1
12/23/07
40.2
KC1.1
12/23/07
44.4
KC1.1
12/23/07
44.3
KC1.1
12/23/07
41.1
KC1.1
12/23/07
38.1
KC1.1
12/23/07
35.9
KC1.1
12/23/07
38.8
KC1.1
12/23/07
43.6
KC1.1
12/23/07
47
KC1.1
12/23/07
47
KC1.1
12/23/07
45.5
KC1.1
12/23/07
44.6
KC1.1
12/23/07
37.4
KC1.1
12/23/07
38.9
KC1.1
12/23/07
44.1
KC1.1
12/23/07
48
KC1.1
12/23/07
49
KC1.1
12/23/07
47.2
KC1.1
12/23/07
38.3
KC1.1
12/23/07
35.6
KC1.1
12/23/07
38.7
KC1.1
12/23/07
34.9
KC1.1
12/23/07
27.6
KC1.1
12/23/07
19
KC1.1
12/23/07
10.7
KC1.1
12/23/07
9.1
KC1.1
12/23/07
71.2
KC1.1
12/27/07
33.8
KC1.1
12/27/07
32.3
KC1.1
12/27/07
33.9
KC1.1
12/27/07
36
F-92

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
12/27/07
39.9
KC1.1
12/27/07
36.4
KC1.1
12/27/07
35.8
KC1.1
12/27/07
36.4
KC1.1
12/27/07
49.3
KC1.1
12/27/07
31.4
KC1.1
12/27/07
28.8
KC1.1
12/27/07
28
KC1.1
12/27/07
29
KC1.1
12/27/07
24.5
KC1.1
12/27/07
16.2
KC1.1
12/27/07
8.1
KC1.1
12/27/07
6
KC1.1
12/27/07
46.2
KC1.1
1 2/28/07
41.3
KC1.1
1 2/28/07
43.3
KC1.1
1 2/28/07
44
KC1.1
1 2/28/07
41.6
KC1.1
1 2/28/07
52.9
KC1.1
1 2/28/07
46.3
KC1.1
1 2/28/07
44.9
KC1.1
1 2/28/07
47.8
KC1.1
1 2/28/07
51.5
KC1.1
1 2/28/07
53.5
KC1.1
1 2/28/07
51
KC1.1
1 2/28/07
54.1
KC1.1
1 2/28/07
54.8
KC1.1
1 2/28/07
55.1
KC1.1
1 2/28/07
54
KC1.1
1 2/28/07
47.3
KC1.1
1 2/28/07
47.1
KC1.1
1 2/28/07
45.1
KC1.1
1 2/28/07
31.1
KC1.1
1 2/28/07
26.6
KC1.1
1 2/28/07
30
KC1.1
1 2/28/07
34.6
KC1.1
1 2/28/07
36.5
KC1.1
1 2/28/07
32.3
KC1.1
1 2/28/07
36
KC1.1
1 2/28/07
38.9
KC1.1
1 2/28/07
39
KC1.1
1 2/28/07
36.5
KC1.1
1 2/28/07
38.2
KC1.1
1 2/28/07
34.4
KC1.1
1 2/28/07
27.4
F-93

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
1 2/28/07
27
KC1.1
1 2/28/07
27.8
KC1.1
1 2/28/07
28.7
KC1.1
1 2/28/07
31.8
KC1.1
1 2/28/07
31.7
KC1.1
1 2/28/07
33.3
KC1.1
1 2/28/07
31.1
KC1.1
1 2/28/07
29.3
KC1.1
1 2/28/07
29.1
KC1.1
1 2/28/07
41.6
KC1.1
1 2/28/07
42.1
KC1.1
1 2/28/07
39.6
KC1.1
01/02/08
53.6
KC1.1
01/02/08
8.3
KC1.1
01/02/08
38
KC1.1
01/02/08
72.7
KC1.1
01/02/08
78.4
KC1.1
01/02/08
62.4
KC1.1
01/02/08
54.3
KC1.1
01/02/08
78.3
KC1.1
01/02/08
90.5
KC1.1
01/02/08
77.2
KC1.1
01/02/08
63.7
KC1.1
01/02/08
59.4
KC1.1
01/02/08
56.1
KC1.1
01/02/08
54.7
KC1.1
01/02/08
55.9
KC1.1
01/02/08
57.4
KC1.1
01/02/08
61.2
KC1.1
01/02/08
73.2
KC1.1
01/02/08
77.8
KC1.1
01/02/08
62.2
KC1.1
01/02/08
49.3
KC1.1
01/02/08
48.5
KC1.1
01/02/08
50.5
KC1.1
01/02/08
53.6
KC1.1
01/02/08
58.9
KC1.1
01/02/08
70.3
KC1.1
01/02/08
75.1
KC1.1
01/02/08
63.9
KC1.1
01/02/08
53.1
KC1.1
01/02/08
48
KC1.1
01/02/08
47.9
KC1.1
01/02/08
50.1
KC1.1
01/02/08
50.1
F-94

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/02/08
52.4
KC1.1
01/02/08
67.4
KC1.1
01/02/08
74.4
KC1.1
01/02/08
63.7
KC1.1
01/02/08
56
KC1.1
01/02/08
52
KC1.1
01/02/08
52.4
KC1.1
01/02/08
55.2
KC1.1
01/02/08
56.1
KC1.1
01/02/08
56.6
KC1.1
01/02/08
56.4
KC1.1
01/02/08
57.6
KC1.1
01/02/08
75.9
KC1.1
01/02/08
82.7
KC1.1
01/02/08
80.5
KC1.1
01/02/08
61.5
KC1.1
01/02/08
53.3
KC1.1
01/02/08
50.6
KC1.1
01/02/08
50.7
KC1.1
01/02/08
50.1
KC1.1
01/02/08
51.1
KC1.1
01/02/08
52.1
KC1.1
01/02/08
51.5
KC1.1
01/02/08
51.9
KC1.1
01/02/08
53.7
KC1.1
01/02/08
54.2
KC1.1
01/03/08
55.2
KC1.1
01/03/08
65.2
KC1.1
01/03/08
46.4
KC1.1
01/03/08
61.7
KC1.1
01/03/08
60.1
KC1.1
01/03/08
53
KC1.1
01/03/08
48.6
KC1.1
01/03/08
48.3
KC1.1
01/03/08
50.4
KC1.1
01/03/08
56.1
KC1.1
01/03/08
57.5
KC1.1
01/03/08
69.6
KC1.1
01/03/08
67.6
KC1.1
01/03/08
57.9
KC1.1
01/03/08
53.3
KC1.1
01/03/08
51.9
KC1.1
01/03/08
52
KC1.1
01/03/08
52.5
KC1.1
01/03/08
54.5
F-95

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/03/08
67.6
KC1.1
01/03/08
67.8
KC1.1
01/03/08
58.6
KC1.1
01/03/08
52.5
KC1.1
01/03/08
49.7
KC1.1
01/03/08
49
KC1.1
01/03/08
50.3
KC1.1
01/03/08
52.5
KC1.1
01/03/08
52.6
KC1.1
01/03/08
66.1
KC1.1
01/03/08
74.2
KC1.1
01/03/08
60.8
KC1.1
01/03/08
54.4
KC1.1
01/03/08
52.8
KC1.1
01/03/08
51.9
KC1.1
01/03/08
53
KC1.1
01/03/08
65.7
KC1.1
01/03/08
74.4
KC1.1
01/03/08
72.1
KC1.1
01/03/08
59.4
KC1.1
01/03/08
55.9
KC1.1
01/03/08
63.9
KC1.1
01/03/08
65.7
KC1.1
01/03/08
56.3
KC1.1
01/03/08
58.3
KC1.1
01/03/08
55.3
KC1.1
01/03/08
66.1
KC1.1
01/03/08
70.8
KC1.1
01/03/08
71.3
KC1.1
01/03/08
70.1
KC1.1
01/05/08
186.3
KC1.1
01/05/08
8
KC1.1
01/05/08
15.1
KC1.1
01/05/08
49.3
KC1.1
01/05/08
61.2
KC1.1
01/05/08
61.1
KC1.1
01/05/08
53.1
KC1.1
01/05/08
48
KC1.1
01/05/08
45.9
KC1.1
01/05/08
48.9
KC1.1
01/05/08
50.8
KC1.1
01/05/08
51.2
KC1.1
01/05/08
52.7
KC1.1
01/05/08
68.5
KC1.1
01/05/08
78.9
F-96

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/05/08
67.2
KC1.1
01/05/08
56.4
KC1.1
01/05/08
50
KC1.1
01/05/08
51.3
KC1.1
01/05/08
49.3
KC1.1
01/05/08
50.6
KC1.1
01/05/08
50.6
KC1.1
01/05/08
51.7
KC1.1
01/05/08
52.1
KC1.1
01/05/08
66.3
KC1.1
01/05/08
70.9
KC1.1
01/05/08
63
KC1.1
01/05/08
52.8
KC1.1
01/05/08
49.8
KC1.1
01/05/08
47.4
KC1.1
01/05/08
48.7
KC1.1
01/05/08
48.9
KC1.1
01/05/08
49.8
KC1.1
01/05/08
51.8
KC1.1
01/05/08
64.3
KC1.1
01/05/08
70.8
KC1.1
01/05/08
59.8
KC1.1
01/05/08
52.1
KC1.1
01/05/08
47.3
KC1.1
01/05/08
47.7
KC1.1
01/05/08
46.7
KC1.1
01/05/08
47.8
KC1.1
01/05/08
47.6
KC1.1
01/05/08
46.8
KC1.1
01/05/08
52.9
KC1.1
01/05/08
64.3
KC1.1
01/05/08
68.4
KC1.1
01/05/08
56.6
KC1.1
01/05/08
46
KC1.1
01/05/08
39.4
KC1.1
01/05/08
43.5
KC1.1
01/05/08
46.7
KC1.1
01/05/08
55.2
KC1.1
01/05/08
45.5
KC1.1
01/05/08
42.9
KC1.1
01/05/08
44
KC1.1
01/05/08
43.4
KC1.1
01/05/08
43.2
KC1.1
01/06/08
44.5
KC1.1
01/08/08
26.3
F-97

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/08/08
24.8
KC1.1
01/08/08
36.5
KC1.1
01/08/08
37.1
KC1.1
01/08/08
36.9
KC1.1
01/08/08
35.5
KC1.1
01/08/08
38.4
KC1.1
01/08/08
40.5
KC1.1
01/08/08
39.9
KC1.1
01/08/08
43.7
KC1.1
01/08/08
46.2
KC1.1
01/08/08
52.3
KC1.1
01/08/08
49.6
KC1.1
01/08/08
41.5
KC1.1
01/08/08
40.8
KC1.1
01/08/08
37.1
KC1.1
01/08/08
37.8
KC1.1
01/08/08
40.9
KC1.1
01/08/08
41
KC1.1
01/08/08
44.3
KC1.1
01/08/08
45.5
KC1.1
01/08/08
46.8
KC1.1
01/08/08
47.2
KC1.1
01/08/08
44
KC1.1
01/08/08
47.2
KC1.1
01/08/08
57.7
KC1.1
01/08/08
50.7
KC1.1
01/08/08
47
KC1.1
01/08/08
49.3
KC1.1
01/08/08
47.5
KC1.1
01/08/08
48.1
KC1.1
01/08/08
53.4
KC1.1
01/08/08
54.2
KC1.1
01/08/08
55.4
KC1.1
01/08/08
57.1
KC1.1
01/08/08
52.6
KC1.1
01/08/08
53.5
KC1.1
01/08/08
56.1
KC1.1
01/08/08
52.7
KC1.1
01/08/08
53.5
KC1.1
01/08/08
54.6
KC1.1
01/08/08
57.7
KC1.1
01/08/08
54.2
KC1.1
01/08/08
55.2
KC1.1
01/08/08
55.8
KC1.1
01/08/08
54.4
F-98

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/08/08
54.9
KC1.1
01/08/08
54
KC1.1
01/08/08
55.9
KC1.1
01/08/08
58
KC1.1
01/08/08
57.9
KC1.1
01/08/08
55.8
KC1.1
01/08/08
53.1
KC1.1
01/08/08
52
KC1.1
01/08/08
53
KC1.1
01/08/08
54.5
KC1.1
01/08/08
54.1
KC1.1
01/08/08
56.8
KC1.1
01/08/08
58.9
KC1.1
01/08/08
53.2
KC1.1
01/08/08
53.3
KC1.1
01/08/08
54.4
KC1.1
01/08/08
54.7
KC1.1
01/08/08
51.7
KC1.1
01/08/08
51.9
KC1.1
01/08/08
52
KC1.1
01/08/08
52.4
KC1.1
01/08/08
52.3
KC1.1
01/08/08
51.7
KC1.1
01/08/08
52.4
KC1.1
01/08/08
50.8
KC1.1
01/08/08
49.5
KC1.1
01/08/08
50.9
KC1.1
01/08/08
50.4
KC1.1
01/08/08
51.1
KC1.1
01/08/08
52.2
KC1.1
01/08/08
50.7
KC1.1
01/08/08
54.2
KC1.1
01/08/08
50.2
KC1.1
01/08/08
48.7
KC1.1
01/08/08
48.3
KC1.1
01/08/08
48.9
KC1.1
01/08/08
52
KC1.1
01/08/08
49.9
KC1.1
01/08/08
50.3
KC1.1
01/08/08
52.9
KC1.1
01/08/08
51
KC1.1
01/08/08
51
KC1.1
01/08/08
51.4
KC1.1
01/08/08
49.2
KC1.1
01/08/08
49.9
F-99

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/09/08
48.4
KC1.1
01/09/08
41.3
KC1.1
01/09/08
30.9
KC1.1
01/09/08
39.7
KC1.1
01/09/08
43.5
KC1.1
01/09/08
48.7
KC1.1
01/09/08
50
KC1.1
01/09/08
51.7
KC1.1
01/09/08
55.7
KC1.1
01/09/08
51.3
KC1.1
01/09/08
50.8
KC1.1
01/09/08
53.2
KC1.1
01/09/08
49.9
KC1.1
01/09/08
50.4
KC1.1
01/09/08
51
KC1.1
01/09/08
56.2
KC1.1
01/09/08
52.4
KC1.1
01/09/08
49.9
KC1.1
01/09/08
49.7
KC1.1
01/09/08
47.8
KC1.1
01/09/08
48.6
KC1.1
01/09/08
48.4
KC1.1
01/09/08
47.6
KC1.1
01/09/08
48.8
KC1.1
01/09/08
49.7
KC1.1
01/09/08
52
KC1.1
01/09/08
50.8
KC1.1
01/09/08
51.8
KC1.1
01/09/08
53.3
KC1.1
01/09/08
51.7
KC1.1
01/09/08
51.4
KC1.1
01/09/08
52.3
KC1.1
01/09/08
49.8
KC1.1
01/09/08
48.8
KC1.1
01/09/08
50
KC1.1
01/09/08
49.6
KC1.1
01/09/08
50.2
KC1.1
01/09/08
52
KC1.1
01/09/08
49.1
KC1.1
01/09/08
49.1
KC1.1
01/09/08
48.9
KC1.1
01/09/08
51.5
KC1.1
01/09/08
52.1
KC1.1
01/09/08
58.5
KC1.1
01/09/08
63.9
F-100

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/09/08
70.6
KC1.1
01/09/08
73.6
KC1.1
01/09/08
79.6
KC1.1
01/09/08
85.7
KC1.1
01/09/08
86.4
KC1.1
01/09/08
74.1
KC1.1
01/09/08
66.2
KC1.1
01/09/08
79.7
KC1.1
01/09/08
101.9
KC1.1
01/10/08
117.4
KC1.1
01/10/08
125.2
KC1.1
01/10/08
87.5
KC1.1
01/10/08
68.3
KC1.1
01/10/08
69.1
KC1.1
01/10/08
67.1
KC1.1
01/10/08
65.2
KC1.1
01/10/08
73.2
KC1.1
01/10/08
65.7
KC1.1
01/10/08
66.8
KC1.1
01/10/08
72.6
KC1.1
01/10/08
71.1
KC1.1
01/10/08
69.7
KC1.1
01/10/08
68.4
KC1.1
01/10/08
67.7
KC1.1
01/10/08
66.7
KC1.1
01/11/08
64.5
KC1.1
01/11/08
53.2
KC1.1
01/11/08
38.4
KC1.1
01/11/08
47.1
KC1.1
01/11/08
55.9
KC1.1
01/11/08
59.2
KC1.1
01/11/08
62.5
KC1.1
01/11/08
36.3
KC1.1
01/11/08
55.8
KC1.1
01/11/08
57.4
KC1.1
01/11/08
57.2
KC1.1
01/11/08
57.9
KC1.1
01/11/08
64.9
KC1.1
01/11/08
55.4
KC1.1
01/11/08
53.5
KC1.1
01/11/08
53.8
KC1.1
01/11/08
54.1
KC1.1
01/11/08
57
KC1.1
01/11/08
55.2
KC1.1
01/11/08
57.8
F-101

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/11/08
61.4
KC1.1
01/11/08
61.2
KC1.1
01/11/08
58
KC1.1
01/11/08
61.1
KC1.1
01/11/08
60.5
KC1.1
01/11/08
60.4
KC1.1
01/11/08
57.8
KC1.1
01/11/08
57.8
KC1.1
01/11/08
114
KC1.1
01/11/08
58.3
KC1.1
01/11/08
54
KC1.1
01/11/08
55
KC1.1
01/11/08
53.7
KC1.1
01/11/08
54.2
KC1.1
01/11/08
55.2
KC1.1
01/11/08
50
KC1.1
01/11/08
51.1
KC1.1
01/11/08
51.1
KC1.1
01/11/08
49.9
KC1.1
01/1 2/08
39.7
KC1.1
01/1 2/08
30.3
KC1.1
01/1 2/08
59.1
KC1.1
01/1 2/08
41
KC1.1
01/1 2/08
46
KC1.1
01/1 2/08
48.3
KC1.1
01/1 2/08
50.8
KC1.1
01/1 2/08
40.3
KC1.1
01/1 2/08
109.5
KC1.1
01/12/08
121
KC1.1
01/1 2/08
110.8
KC1.1
01/1 2/08
104.2
KC1.1
01/1 2/08
107.7
KC1.1
01/1 2/08
117.7
KC1.1
01/1 2/08
203.1
KC1.1
01/1 2/08
154.1
KC1.1
01/12/08
115
KC1.1
01/14/08
48.4
KC1.1
01/14/08
63.6
KC1.1
01/14/08
64.7
KC1.1
01/14/08
65.1
KC1.1
01/14/08
78.3
KC1.1
01/14/08
87.9
KC1.1
01/14/08
91.2
KC1.1
01/14/08
94.4
KC1.1
01/14/08
89.5
F-102

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/14/08
86.6
KC1.1
01/14/08
81.9
KC1.1
01/14/08
74.5
KC1.1
01/14/08
69.1
KC1.1
01/14/08
60.6
KC1.1
01/14/08
59.5
KC1.1
01/14/08
53.4
KC1.1
01/14/08
50.8
KC1.1
01/14/08
45.3
KC1.1
01/14/08
44.1
KC1.1
01/14/08
37.1
KC1.1
01/14/08
35.5
KC1.1
01/14/08
59.8
KC1.1
01/14/08
41
KC1.1
01/14/08
50.1
KC1.1
01/14/08
55.1
KC1.1
01/14/08
55.2
KC1.1
01/14/08
51.2
KC1.1
01/14/08
51.2
KC1.1
01/14/08
52.3
KC1.1
01/14/08
50.7
KC1.1
01/14/08
54.1
KC1.1
01/14/08
53.3
KC1.1
01/14/08
53.1
KC1.1
01/14/08
54.9
KC1.1
01/14/08
47
KC1.1
01/14/08
43.1
KC1.1
01/14/08
41.7
KC1.1
01/14/08
60.3
KC1.1
01/14/08
54.1
KC1.1
01/14/08
82.5
KC1.1
01/14/08
51.8
KC1.1
01/14/08
49.4
KC1.1
01/15/08
50
KC1.1
01/15/08
44.2
KC1.1
01/15/08
12.4
KC1.1
01/15/08
37.9
KC1.1
01/15/08
29.7
KC1.1
01/15/08
33.4
KC1.1
01/15/08
40.6
KC1.1
01/15/08
46.6
KC1.1
01/15/08
51.6
KC1.1
01/15/08
52.1
KC1.1
01/15/08
48.4
KC1.1
01/15/08
44.1
F-103

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/15/08
54.3
KC1.1
01/15/08
62.6
KC1.1
01/15/08
59.3
KC1.1
01/15/08
55.8
KC1.1
01/15/08
51.9
KC1.1
01/15/08
51.9
KC1.1
01/15/08
48.6
KC1.1
01/15/08
41.5
KC1.1
01/15/08
44.7
KC1.1
01/15/08
46.5
KC1.1
01/15/08
48.5
KC1.1
01/15/08
47.5
KC1.1
01/15/08
39.5
KC1.1
01/15/08
43.3
KC1.1
01/15/08
45.8
KC1.1
01/15/08
47.9
KC1.1
01/15/08
50.1
KC1.1
01/15/08
50.1
KC1.1
01/15/08
49.7
KC1.1
01/15/08
50.5
KC1.1
01/15/08
49.9
KC1.1
01/15/08
48.8
KC1.1
01/15/08
44.7
KC1.1
01/15/08
37.3
KC1.1
01/15/08
43.8
KC1.1
01/15/08
47.1
KC1.1
01/15/08
47.8
KC1.1
01/15/08
51.2
KC1.1
01/15/08
50.2
KC1.1
01/15/08
49
KC1.1
01/15/08
49.8
KC1.1
01/15/08
41.2
KC1.1
01/15/08
38.4
KC1.1
01/15/08
40.1
KC1.1
01/15/08
40.5
KC1.1
01/15/08
44.5
KC1.1
01/15/08
44.9
KC1.1
01/15/08
45.9
KC1.1
01/15/08
46.2
KC1.1
01/15/08
39.6
KC1.1
01/15/08
37.3
KC1.1
01/15/08
40
KC1.1
01/15/08
41.3
KC1.1
01/15/08
42.5
KC1.1
01/15/08
39.1
F-104

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/15/08
37.7
KC1.1
01/15/08
33.5
KC1.1
01/15/08
30.1
KC1.1
01/15/08
31
KC1.1
01/15/08
27.9
KC1.1
01/24/08
79.2
KC1.1
01/24/08
9.2
KC1.1
01/24/08
8.1
KC1.1
01/24/08
12.4
KC1.1
01/24/08
21.6
KC1.1
01/24/08
23.8
KC1.1
01/24/08
26.8
KC1.1
01/24/08
30.6
KC1.1
01/24/08
33
KC1.1
01/24/08
32.4
KC1.1
01/24/08
32.9
KC1.1
01/24/08
37.1
KC1.1
01/24/08
40.4
KC1.1
01/24/08
42.6
KC1.1
01/24/08
44.4
KC1.1
01/24/08
46.4
KC1.1
01/24/08
48.2
KC1.1
01/24/08
49.5
KC1.1
01/24/08
50.7
KC1.1
01/24/08
50.8
KC1.1
01/24/08
49.9
KC1.1
01/24/08
48.4
KC1.1
01/24/08
48.7
KC1.1
01/24/08
51
KC1.1
01/24/08
50.1
KC1.1
01/24/08
49.2
KC1.1
01/24/08
49.2
KC1.1
01/24/08
48.3
KC1.1
01/24/08
48.3
KC1.1
01/24/08
48.7
KC1.1
01/24/08
48.6
KC1.1
01/24/08
48.8
KC1.1
01/24/08
48.8
KC1.1
01/24/08
48.4
KC1.1
01/25/08
48.3
KC1.1
01/25/08
48.7
KC1.1
01/25/08
64.8
KC1.1
01/25/08
47.1
KC1.1
01/25/08
46.2
KC1.1
01/25/08
51.3
F-105

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.1
01/25/08
99.8
KC1.1
01/25/08
66.6
KC1.1
01/25/08
51.3
KC1.1
01/25/08
48.6
KC1.1
01/25/08
47.3
KC1.1
01/25/08
47.2
KC1.1
01/25/08
46.7
KC1.1
01/25/08
47
KC1.1
01/25/08
47.3
KC1.1
01/25/08
47.8
KC1.1
01/25/08
48.3
KC1.1
01/25/08
49.7
KC1.1
01/25/08
51.2
KC1.2
1 2/02/07
41.1
KC1.2
1 2/02/07
41.9
KC1.2
1 2/02/07
39.8
KC1.2
1 2/02/07
37.6
KC1.2
1 2/02/07
36.6
KC1.2
1 2/02/07
41.6
KC1.2
1 2/02/07
42.4
KC1.2
1 2/02/07
39.6
KC1.2
1 2/02/07
35.5
KC1.2
1 2/02/07
32.3
KC1.2
1 2/02/07
34.4
KC1.2
1 2/02/07
35.3
KC1.2
1 2/02/07
33.9
KC1.2
1 2/02/07
47.6
KC1.2
1 2/02/07
43
KC1.2
1 2/02/07
43.9
KC1.2
1 2/02/07
46.1
KC1.2
1 2/02/07
41.3
KC1.2
1 2/02/07
37
KC1.2
1 2/02/07
39.2
KC1.2
1 2/02/07
43
KC1.2
1 2/02/07
47.5
KC1.2
1 2/02/07
49.8
KC1.2
1 2/02/07
49.3
KC1.2
1 2/02/07
49
KC1.2
1 2/02/07
49.3
KC1.2
1 2/02/07
35.1
KC1.2
1 2/02/07
36.9
KC1.2
1 2/02/07
42.5
KC1.2
1 2/02/07
45
KC1.2
1 2/02/07
45.6
KC1.2
1 2/02/07
43.5
F-106

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/02/07
40.5
KC1.2
1 2/02/07
37.5
KC1.2
1 2/02/07
41.1
KC1.2
1 2/02/07
46.6
KC1.2
1 2/02/07
52.2
KC1.2
1 2/02/07
55
KC1.2
1 2/02/07
57.4
KC1.2
1 2/02/07
65.1
KC1.2
1 2/02/07
76.9
KC1.2
1 2/02/07
74.6
KC1.2
1 2/02/07
44.6
KC1.2
1 2/02/07
43.8
KC1.2
1 2/02/07
47.9
KC1.2
1 2/02/07
54.2
KC1.2
1 2/02/07
54.9
KC1.2
1 2/02/07
53.8
KC1.2
1 2/02/07
48.3
KC1.2
1 2/02/07
40.6
KC1.2
1 2/02/07
29.9
KC1.2
1 2/02/07
18
KC1.2
1 2/02/07
14.4
KC1.2
1 2/02/07
14.9
KC1.2
1 2/02/07
12.6
KC1.2
1 2/02/07
8.3
KC1.2
1 2/02/07
54.8
KC1.2
1 2/03/07
85.8
KC1.2
1 2/03/07
73.4
KC1.2
1 2/03/07
87
KC1.2
1 2/03/07
71.5
KC1.2
1 2/03/07
69.4
KC1.2
1 2/03/07
88.6
KC1.2
1 2/03/07
72.7
KC1.2
1 2/03/07
79.7
KC1.2
1 2/03/07
94.4
KC1.2
1 2/03/07
74.3
KC1.2
1 2/03/07
78.5
KC1.2
1 2/03/07
89.5
KC1.2
1 2/03/07
77.3
KC1.2
1 2/03/07
83.6
KC1.2
1 2/03/07
83.6
KC1.2
1 2/03/07
94.5
KC1.2
1 2/03/07
107
KC1.2
1 2/03/07
94.3
KC1.2
1 2/03/07
93.8
KC1.2
1 2/03/07
116.2
F-107

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/03/07
108.3
KC1.2
1 2/03/07
121.9
KC1.2
1 2/03/07
116.6
KC1.2
1 2/03/07
115
KC1.2
1 2/03/07
124.4
KC1.2
1 2/03/07
120.2
KC1.2
1 2/03/07
119.9
KC1.2
1 2/03/07
127.8
KC1.2
1 2/03/07
120.3
KC1.2
1 2/03/07
138.1
KC1.2
1 2/03/07
136.5
KC1.2
1 2/03/07
128
KC1.2
1 2/03/07
144.8
KC1.2
1 2/03/07
148.2
KC1.2
1 2/03/07
135.8
KC1.2
1 2/03/07
145.9
KC1.2
1 2/03/07
140
KC1.2
1 2/03/07
146.2
KC1.2
1 2/03/07
156
KC1.2
1 2/03/07
134.4
KC1.2
1 2/03/07
107.8
KC1.2
1 2/03/07
111.1
KC1.2
1 2/03/07
114.1
KC1.2
1 2/03/07
116.4
KC1.2
1 2/03/07
120
KC1.2
1 2/03/07
114.9
KC1.2
1 2/03/07
142.9
KC1.2
1 2/03/07
192.6
KC1.2
1 2/03/07
127.9
KC1.2
1 2/03/07
162.6
KC1.2
1 2/03/07
134.2
KC1.2
1 2/03/07
146.5
KC1.2
1 2/03/07
126.7
KC1.2
1 2/03/07
135.9
KC1.2
1 2/03/07
169.4
KC1.2
1 2/03/07
143.7
KC1.2
1 2/03/07
162.8
KC1.2
1 2/03/07
142.7
KC1.2
1 2/03/07
142.3
KC1.2
1 2/03/07
142.2
KC1.2
1 2/03/07
148.1
KC1.2
1 2/03/07
150.2
KC1.2
1 2/03/07
151.8
KC1.2
1 2/03/07
146.3
KC1.2
1 2/03/07
138.9
F-108

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/03/07
147.4
KC1.2
1 2/03/07
165.5
KC1.2
1 2/03/07
136.6
KC1.2
1 2/03/07
131.2
KC1.2
1 2/03/07
114.2
KC1.2
1 2/03/07
102.7
KC1.2
1 2/03/07
105.5
KC1.2
1 2/03/07
100.5
KC1.2
1 2/03/07
92.4
KC1.2
1 2/03/07
80
KC1.2
1 2/03/07
73
KC1.2
1 2/03/07
67.5
KC1.2
1 2/03/07
67.3
KC1.2
1 2/03/07
70.1
KC1.2
1 2/03/07
70.6
KC1.2
1 2/03/07
62.4
KC1.2
1 2/03/07
52.6
KC1.2
1 2/03/07
51
KC1.2
1 2/03/07
51.9
KC1.2
1 2/03/07
53.4
KC1.2
1 2/03/07
48
KC1.2
1 2/03/07
40.3
KC1.2
1 2/03/07
38.1
KC1.2
1 2/03/07
38
KC1.2
1 2/03/07
38.1
KC1.2
1 2/03/07
48.8
KC1.2
1 2/03/07
57.8
KC1.2
1 2/03/07
58
KC1.2
1 2/03/07
40
KC1.2
1 2/04/07
70.2
KC1.2
1 2/04/07
64
KC1.2
1 2/04/07
65.3
KC1.2
1 2/04/07
71.4
KC1.2
1 2/04/07
74.2
KC1.2
1 2/04/07
71.4
KC1.2
1 2/04/07
64.2
KC1.2
1 2/04/07
62.4
KC1.2
1 2/04/07
67.4
KC1.2
1 2/04/07
70.5
KC1.2
1 2/04/07
70.3
KC1.2
1 2/04/07
65.1
KC1.2
1 2/04/07
66
KC1.2
1 2/04/07
70.7
KC1.2
1 2/04/07
71.3
KC1.2
1 2/04/07
67.2
F-109

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/04/07
64.9
KC1.2
1 2/04/07
69.1
KC1.2
1 2/04/07
71.3
KC1.2
1 2/04/07
68.2
KC1.2
1 2/04/07
63.3
KC1.2
1 2/04/07
66.6
KC1.2
1 2/04/07
71.7
KC1.2
1 2/04/07
74.7
KC1.2
1 2/04/07
72.3
KC1.2
1 2/04/07
69.8
KC1.2
1 2/04/07
67.9
KC1.2
1 2/04/07
72.1
KC1.2
1 2/04/07
74
KC1.2
1 2/04/07
71.5
KC1.2
1 2/04/07
65.2
KC1.2
1 2/04/07
64.5
KC1.2
1 2/04/07
69.9
KC1.2
1 2/04/07
81.1
KC1.2
1 2/04/07
70.4
KC1.2
1 2/04/07
63.8
KC1.2
1 2/04/07
63.2
KC1.2
1 2/04/07
68
KC1.2
1 2/04/07
68.9
KC1.2
1 2/04/07
66.1
KC1.2
1 2/04/07
63.1
KC1.2
1 2/04/07
66.8
KC1.2
1 2/04/07
69.8
KC1.2
1 2/04/07
67.2
KC1.2
1 2/04/07
65.1
KC1.2
1 2/04/07
70.6
KC1.2
1 2/04/07
72.2
KC1.2
1 2/04/07
69.1
KC1.2
1 2/04/07
63.6
KC1.2
1 2/04/07
64.7
KC1.2
1 2/04/07
67.2
KC1.2
1 2/04/07
68.9
KC1.2
1 2/04/07
64.8
KC1.2
1 2/04/07
64
KC1.2
1 2/04/07
84.6
KC1.2
1 2/04/07
183.5
KC1.2
1 2/04/07
221.8
KC1.2
1 2/04/07
196.6
KC1.2
1 2/04/07
161.4
KC1.2
1 2/04/07
196
KC1.2
1 2/04/07
195.6
F-110

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/04/07
144.5
KC1.2
1 2/04/07
202.6
KC1.2
1 2/04/07
231.3
KC1.2
1 2/04/07
163
KC1.2
1 2/04/07
70.5
KC1.2
1 2/04/07
66.3
KC1.2
1 2/04/07
65.3
KC1.2
1 2/04/07
67.7
KC1.2
1 2/04/07
68.9
KC1.2
1 2/04/07
67.2
KC1.2
1 2/04/07
65.2
KC1.2
1 2/04/07
67.5
KC1.2
1 2/04/07
70
KC1.2
1 2/04/07
70
KC1.2
1 2/04/07
68.3
KC1.2
1 2/04/07
70
KC1.2
1 2/04/07
71.2
KC1.2
1 2/04/07
66.6
KC1.2
1 2/04/07
68.1
KC1.2
1 2/04/07
70.4
KC1.2
1 2/04/07
70.1
KC1.2
1 2/04/07
66.4
KC1.2
1 2/04/07
70
KC1.2
1 2/04/07
84.2
KC1.2
1 2/04/07
86.9
KC1.2
1 2/04/07
75.9
KC1.2
1 2/04/07
80.2
KC1.2
1 2/04/07
74.8
KC1.2
1 2/04/07
73.4
KC1.2
1 2/04/07
164.2
KC1.2
1 2/04/07
173
KC1.2
1 2/04/07
98.5
KC1.2
1 2/05/07
65.1
KC1.2
1 2/05/07
65.9
KC1.2
1 2/05/07
70.1
KC1.2
1 2/05/07
73
KC1.2
1 2/05/07
64.6
KC1.2
1 2/05/07
62.5
KC1.2
1 2/05/07
66.8
KC1.2
1 2/05/07
68.7
KC1.2
1 2/05/07
66.5
KC1.2
1 2/05/07
63.5
KC1.2
1 2/05/07
69.3
KC1.2
1 2/05/07
71.2
KC1.2
1 2/05/07
66
F-111

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/05/07
63.9
KC1.2
1 2/05/07
67.3
KC1.2
1 2/05/07
68.4
KC1.2
1 2/05/07
63.3
KC1.2
1 2/05/07
63.8
KC1.2
1 2/05/07
68.6
KC1.2
1 2/05/07
71.6
KC1.2
1 2/05/07
68.3
KC1.2
1 2/05/07
67
KC1.2
1 2/05/07
70.7
KC1.2
1 2/05/07
74.3
KC1.2
1 2/05/07
73.8
KC1.2
1 2/05/07
68.6
KC1.2
1 2/05/07
72.7
KC1.2
1 2/05/07
77.1
KC1.2
1 2/05/07
73.4
KC1.2
1 2/05/07
67.8
KC1.2
1 2/05/07
72.3
KC1.2
1 2/05/07
75.3
KC1.2
1 2/05/07
77.1
KC1.2
1 2/05/07
74.3
KC1.2
1 2/05/07
72.5
KC1.2
1 2/05/07
77.9
KC1.2
1 2/05/07
82.3
KC1.2
1 2/05/07
82.5
KC1.2
1 2/05/07
87.7
KC1.2
1 2/05/07
82.7
KC1.2
1 2/05/07
88.6
KC1.2
1 2/05/07
94.5
KC1.2
1 2/05/07
87.7
KC1.2
1 2/05/07
82.6
KC1.2
1 2/05/07
96.6
KC1.2
1 2/05/07
92.7
KC1.2
1 2/05/07
95.1
KC1.2
1 2/05/07
90.9
KC1.2
1 2/05/07
88.3
KC1.2
1 2/05/07
92.8
KC1.2
1 2/05/07
96.6
KC1.2
1 2/05/07
95.3
KC1.2
1 2/05/07
96.5
KC1.2
1 2/05/07
102.8
KC1.2
1 2/05/07
108.3
KC1.2
1 2/05/07
109.1
KC1.2
1 2/05/07
106.2
KC1.2
1 2/05/07
108.6
F-112

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/05/07
113.3
KC1.2
1 2/05/07
115.4
KC1.2
1 2/05/07
110.2
KC1.2
1 2/05/07
104.6
KC1.2
1 2/05/07
111.6
KC1.2
1 2/05/07
116.5
KC1.2
1 2/05/07
109
KC1.2
1 2/05/07
95.9
KC1.2
1 2/05/07
86.6
KC1.2
1 2/05/07
94.1
KC1.2
1 2/05/07
99.5
KC1.2
1 2/05/07
100.8
KC1.2
1 2/05/07
95
KC1.2
1 2/05/07
82.6
KC1.2
1 2/05/07
73
KC1.2
1 2/05/07
77.4
KC1.2
1 2/05/07
83
KC1.2
1 2/05/07
85.9
KC1.2
1 2/05/07
78.2
KC1.2
1 2/05/07
68.3
KC1.2
1 2/05/07
65.5
KC1.2
1 2/05/07
69.7
KC1.2
1 2/05/07
73
KC1.2
1 2/05/07
66.4
KC1.2
1 2/05/07
60.6
KC1.2
1 2/05/07
64.7
KC1.2
1 2/05/07
67.6
KC1.2
1 2/05/07
64.1
KC1.2
1 2/05/07
62.6
KC1.2
1 2/05/07
68
KC1.2
1 2/05/07
68.7
KC1.2
1 2/05/07
63.5
KC1.2
1 2/05/07
55.8
KC1.2
1 2/05/07
57.2
KC1.2
1 2/05/07
67.9
KC1.2
1 2/05/07
71.2
KC1.2
1 2/06/07
53.3
KC1.2
1 2/06/07
48.6
KC1.2
1 2/06/07
43
KC1.2
1 2/06/07
40.1
KC1.2
1 2/06/07
41.6
KC1.2
1 2/06/07
43.7
KC1.2
1 2/06/07
44.8
KC1.2
1 2/06/07
43.2
KC1.2
1 2/06/07
40.7
F-113

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/06/07
42.8
KC1.2
1 2/06/07
47
KC1.2
1 2/06/07
51.2
KC1.2
1 2/06/07
50.2
KC1.2
1 2/06/07
45
KC1.2
1 2/06/07
39.3
KC1.2
1 2/06/07
35.7
KC1.2
1 2/06/07
38.2
KC1.2
1 2/06/07
41.1
KC1.2
1 2/06/07
43.8
KC1.2
1 2/06/07
43.7
KC1.2
1 2/06/07
40.4
KC1.2
1 2/06/07
39.3
KC1.2
1 2/06/07
43.1
KC1.2
1 2/06/07
49.1
KC1.2
1 2/06/07
50.3
KC1.2
1 2/06/07
46.4
KC1.2
1 2/06/07
43.6
KC1.2
1 2/06/07
31.3
KC1.2
1 2/06/07
32.6
KC1.2
1 2/06/07
35.3
KC1.2
1 2/06/07
38.5
KC1.2
1 2/06/07
41.6
KC1.2
1 2/06/07
39.6
KC1.2
1 2/06/07
37.6
KC1.2
1 2/06/07
33.5
KC1.2
1 2/06/07
37.3
KC1.2
1 2/06/07
41.2
KC1.2
1 2/06/07
47.1
KC1.2
1 2/06/07
50.7
KC1.2
1 2/06/07
49.9
KC1.2
1 2/06/07
50
KC1.2
1 2/06/07
49.6
KC1.2
1 2/06/07
52.5
KC1.2
1 2/06/07
56.4
KC1.2
1 2/06/07
60.6
KC1.2
1 2/06/07
108
KC1.2
1 2/06/07
177.7
KC1.2
1 2/06/07
203.1
KC1.2
1 2/06/07
224.6
KC1.2
1 2/06/07
285.7
KC1.2
1 2/06/07
265.9
KC1.2
1 2/06/07
133.5
KC1.2
1 2/06/07
145.2
KC1.2
1 2/06/07
166.3
F-114

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/06/07
185.5
KC1.2
1 2/06/07
214.6
KC1.2
1 2/06/07
232.1
KC1.2
1 2/06/07
240.5
KC1.2
1 2/06/07
268.9
KC1.2
1 2/06/07
291.7
KC1.2
1 2/06/07
334.1
KC1.2
1 2/06/07
374
KC1.2
1 2/06/07
376.6
KC1.2
1 2/06/07
376.4
KC1.2
1 2/06/07
388.2
KC1.2
1 2/06/07
379.3
KC1.2
1 2/06/07
379.4
KC1.2
1 2/06/07
359.3
KC1.2
1 2/06/07
292.9
KC1.2
1 2/06/07
254.5
KC1.2
1 2/06/07
262.6
KC1.2
1 2/06/07
206.5
KC1.2
1 2/06/07
148.1
KC1.2
1 2/06/07
98.4
KC1.2
1 2/06/07
97.8
KC1.2
1 2/06/07
90.2
KC1.2
1 2/06/07
70.3
KC1.2
1 2/06/07
58.5
KC1.2
1 2/06/07
67.5
KC1.2
1 2/06/07
77
KC1.2
1 2/06/07
84.1
KC1.2
1 2/06/07
79.5
KC1.2
1 2/06/07
76.5
KC1.2
1 2/06/07
74.8
KC1.2
1 2/06/07
84.2
KC1.2
1 2/06/07
88.2
KC1.2
1 2/06/07
92.7
KC1.2
1 2/06/07
101.7
KC1.2
1 2/06/07
93.5
KC1.2
1 2/06/07
84.2
KC1.2
1 2/06/07
75.6
KC1.2
1 2/06/07
74.6
KC1.2
1 2/06/07
106.3
KC1.2
1 2/06/07
134.3
KC1.2
1 2/06/07
71.8
KC1.2
1 2/07/07
76.5
KC1.2
1 2/07/07
82.4
KC1.2
1 2/07/07
79
KC1.2
1 2/07/07
69.9
F-115

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/07/07
61.9
KC1.2
1 2/07/07
65.3
KC1.2
1 2/07/07
62.3
KC1.2
1 2/07/07
49
KC1.2
1 2/07/07
54.2
KC1.2
1 2/07/07
57.9
KC1.2
1 2/07/07
59.7
KC1.2
1 2/07/07
56.8
KC1.2
1 2/07/07
49.7
KC1.2
1 2/07/07
47.9
KC1.2
1 2/07/07
60.2
KC1.2
1 2/07/07
71.6
KC1.2
1 2/07/07
91.1
KC1.2
1 2/07/07
82.2
KC1.2
1 2/07/07
160.2
KC1.2
1 2/07/07
230.2
KC1.2
1 2/07/07
204.3
KC1.2
1 2/07/07
40.4
KC1.2
1 2/07/07
41.6
KC1.2
1 2/07/07
43.5
KC1.2
1 2/07/07
45
KC1.2
1 2/07/07
39.9
KC1.2
1 2/07/07
39.2
KC1.2
1 2/07/07
41.9
KC1.2
1 2/07/07
45.1
KC1.2
1 2/07/07
46
KC1.2
1 2/07/07
40.3
KC1.2
1 2/07/07
38.5
KC1.2
1 2/07/07
40.1
KC1.2
1 2/07/07
41.9
KC1.2
1 2/07/07
44.3
KC1.2
1 2/07/07
45
KC1.2
1 2/07/07
39.1
KC1.2
1 2/07/07
35
KC1.2
1 2/07/07
32.8
KC1.2
1 2/07/07
34.8
KC1.2
1 2/07/07
35.7
KC1.2
1 2/07/07
57
KC1.2
1 2/07/07
54.5
KC1.2
1 2/08/07
54.3
KC1.2
1 2/08/07
64.2
KC1.2
1 2/08/07
65.9
KC1.2
1 2/08/07
69.9
KC1.2
1 2/08/07
68.1
KC1.2
1 2/08/07
60.3
F-116

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/08/07
56.3
KC1.2
1 2/08/07
44.6
KC1.2
1 2/08/07
43.8
KC1.2
1 2/08/07
47.8
KC1.2
1 2/08/07
54
KC1.2
1 2/08/07
58.8
KC1.2
1 2/08/07
62.7
KC1.2
1 2/08/07
52.5
KC1.2
1 2/08/07
41.6
KC1.2
1 2/08/07
34.3
KC1.2
1 2/08/07
32.6
KC1.2
1 2/08/07
34.8
KC1.2
1 2/08/07
35.4
KC1.2
1 2/08/07
38.6
KC1.2
1 2/08/07
272.3
KC1.2
1 2/08/07
47.9
KC1.2
1 2/08/07
47.9
KC1.2
12/11/07
49
KC1.2
12/11/07
51.2
KC1.2
12/11/07
46.4
KC1.2
12/11/07
38.3
KC1.2
12/11/07
33.3
KC1.2
12/11/07
33.5
KC1.2
12/11/07
37.9
KC1.2
12/11/07
42.2
KC1.2
12/11/07
46.1
KC1.2
12/11/07
45.4
KC1.2
12/11/07
39.9
KC1.2
12/11/07
35
KC1.2
12/11/07
36.6
KC1.2
12/11/07
38
KC1.2
12/11/07
39.3
KC1.2
12/11/07
40.8
KC1.2
12/11/07
32.5
KC1.2
12/11/07
23.6
KC1.2
12/11/07
21.9
KC1.2
12/11/07
52
KC1.2
12/11/07
20.5
KC1.2
12/11/07
128
KC1.2
12/11/07
35.4
KC1.2
12/11/07
33.8
KC1.2
12/11/07
33.8
KC1.2
12/11/07
31.6
KC1.2
12/11/07
24.8
KC1.2
12/11/07
22.2
F-117

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
12/11/07
23.6
KC1.2
12/11/07
52.5
KC1.2
12/11/07
164.4
KC1.2
1 2/1 2/07
41.3
KC1.2
1 2/1 2/07
41.1
KC1.2
1 2/1 2/07
42.7
KC1.2
1 2/1 2/07
45.7
KC1.2
1 2/1 2/07
51.8
KC1.2
1 2/1 2/07
53.2
KC1.2
1 2/1 2/07
52.4
KC1.2
1 2/1 2/07
49
KC1.2
1 2/1 2/07
44.8
KC1.2
1 2/1 2/07
41
KC1.2
1 2/1 2/07
37.3
KC1.2
1 2/1 2/07
42.3
KC1.2
1 2/1 2/07
50
KC1.2
1 2/1 2/07
55.8
KC1.2
1 2/1 2/07
58.9
KC1.2
1 2/1 2/07
57.1
KC1.2
1 2/1 2/07
58.5
KC1.2
1 2/1 2/07
112.7
KC1.2
1 2/1 2/07
100.5
KC1.2
1 2/1 2/07
85.9
KC1.2
1 2/1 2/07
86.5
KC1.2
1 2/1 2/07
98.6
KC1.2
1 2/1 2/07
93.8
KC1.2
1 2/1 2/07
87.3
KC1.2
1 2/1 2/07
76.1
KC1.2
1 2/1 2/07
75.3
KC1.2
1 2/1 2/07
95.8
KC1.2
1 2/1 2/07
114.2
KC1.2
1 2/1 2/07
43.6
KC1.2
1 2/1 2/07
42.9
KC1.2
1 2/18/07
9.3
KC1.2
1 2/18/07
18.5
KC1.2
1 2/19/07
37.9
KC1.2
1 2/19/07
33.5
KC1.2
1 2/19/07
43
KC1.2
1 2/19/07
178.7
KC1.2
1 2/19/07
68.5
KC1.2
1 2/19/07
173.4
KC1.2
1 2/19/07
179.9
KC1.2
1 2/19/07
163.9
KC1.2
1 2/19/07
161.4
KC1.2
1 2/19/07
108
F-118

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/19/07
49.2
KC1.2
1 2/19/07
37.9
KC1.2
1 2/19/07
42.2
KC1.2
1 2/19/07
48.4
KC1.2
1 2/19/07
44.4
KC1.2
1 2/19/07
46
KC1.2
1 2/19/07
42.6
KC1.2
1 2/19/07
39.2
KC1.2
1 2/19/07
43.9
KC1.2
1 2/19/07
42
KC1.2
1 2/19/07
44.6
KC1.2
1 2/19/07
48.2
KC1.2
1 2/19/07
49.8
KC1.2
1 2/19/07
52.2
KC1.2
1 2/19/07
47.9
KC1.2
1 2/19/07
40.2
KC1.2
1 2/19/07
34.9
KC1.2
1 2/19/07
26.1
KC1.2
1 2/19/07
29.6
KC1.2
1 2/19/07
17.2
KC1.2
1 2/19/07
17.3
KC1.2
1 2/19/07
17.6
KC1.2
1 2/19/07
51
KC1.2
1 2/19/07
51.6
KC1.2
1 2/19/07
43.6
KC1.2
1 2/19/07
40.2
KC1.2
1 2/19/07
37.7
KC1.2
1 2/19/07
30.9
KC1.2
1 2/19/07
25.1
KC1.2
1 2/19/07
23.5
KC1.2
1 2/19/07
27.8
KC1.2
1 2/19/07
22.5
KC1.2
1 2/19/07
30.9
KC1.2
1 2/19/07
8.9
KC1.2
1 2/19/07
26.9
KC1.2
1 2/20/07
44.5
KC1.2
1 2/20/07
43.8
KC1.2
1 2/20/07
44.6
KC1.2
1 2/20/07
42.7
KC1.2
1 2/20/07
39.4
KC1.2
1 2/20/07
36.2
KC1.2
1 2/20/07
38.3
KC1.2
1 2/20/07
34.9
KC1.2
1 2/20/07
36.1
KC1.2
1 2/20/07
39.7
F-119

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/20/07
44.3
KC1.2
1 2/20/07
47
KC1.2
1 2/20/07
43
KC1.2
1 2/20/07
41.9
KC1.2
1 2/20/07
39.4
KC1.2
1 2/20/07
34.3
KC1.2
1 2/20/07
32.4
KC1.2
1 2/20/07
35.7
KC1.2
1 2/20/07
38.5
KC1.2
1 2/20/07
39.3
KC1.2
1 2/20/07
40.1
KC1.2
1 2/20/07
41
KC1.2
1 2/20/07
181
KC1.2
1 2/20/07
46.6
KC1.2
1 2/20/07
43.7
KC1.2
1 2/20/07
42.9
KC1.2
1 2/20/07
40.9
KC1.2
1 2/20/07
41.7
KC1.2
1 2/20/07
43.5
KC1.2
1 2/20/07
42.5
KC1.2
1 2/20/07
45.1
KC1.2
1 2/20/07
45.9
KC1.2
1 2/20/07
49.2
KC1.2
1 2/20/07
45.3
KC1.2
1 2/20/07
41.8
KC1.2
1 2/20/07
43.6
KC1.2
1 2/20/07
48.7
KC1.2
1 2/20/07
47.3
KC1.2
1 2/20/07
42.8
KC1.2
1 2/20/07
42.9
KC1.2
1 2/20/07
46.2
KC1.2
1 2/20/07
50.3
KC1.2
1 2/20/07
44.4
KC1.2
1 2/20/07
42.2
KC1.2
1 2/20/07
53
KC1.2
1 2/20/07
45
KC1.2
1 2/20/07
82.9
KC1.2
1 2/20/07
46.3
KC1.2
1 2/20/07
43.8
KC1.2
1 2/20/07
45.3
KC1.2
1 2/20/07
50.6
KC1.2
1 2/20/07
54.4
KC1.2
1 2/20/07
51.3
KC1.2
1 2/20/07
49.9
KC1.2
1 2/20/07
54
F-120

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/20/07
60.2
KC1.2
1 2/20/07
59.7
KC1.2
1 2/20/07
56.4
KC1.2
1 2/20/07
55.8
KC1.2
1 2/20/07
58.9
KC1.2
1 2/20/07
61.5
KC1.2
1 2/20/07
57.7
KC1.2
1 2/20/07
53.6
KC1.2
1 2/20/07
56.5
KC1.2
1 2/20/07
58.5
KC1.2
1 2/20/07
53.7
KC1.2
1 2/20/07
53.2
KC1.2
1 2/20/07
57.6
KC1.2
1 2/20/07
64.5
KC1.2
1 2/20/07
61.8
KC1.2
1 2/20/07
55.1
KC1.2
1 2/20/07
50.4
KC1.2
1 2/20/07
50.1
KC1.2
1 2/20/07
54.9
KC1.2
1 2/20/07
61.3
KC1.2
1 2/20/07
61.5
KC1.2
1 2/20/07
55.2
KC1.2
1 2/20/07
52.4
KC1.2
1 2/20/07
56
KC1.2
1 2/20/07
62.5
KC1.2
1 2/20/07
59.8
KC1.2
1 2/20/07
53.3
KC1.2
1 2/20/07
49.2
KC1.2
1 2/20/07
52.2
KC1.2
1 2/20/07
60.1
KC1.2
1 2/20/07
61.8
KC1.2
1 2/20/07
55
KC1.2
1 2/20/07
44.2
KC1.2
1 2/20/07
36.8
KC1.2
1 2/20/07
34.6
KC1.2
1 2/20/07
37.1
KC1.2
1 2/20/07
40.7
KC1.2
1 2/20/07
76.2
KC1.2
1 2/20/07
52.3
KC1.2
1 2/20/07
47.4
KC1.2
12/21/07
44.1
KC1.2
12/23/07
29.2
KC1.2
12/23/07
36
KC1.2
12/23/07
34
KC1.2
12/23/07
37.2
F-121

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
12/23/07
35.9
KC1.2
12/23/07
34.2
KC1.2
12/23/07
32.5
KC1.2
12/23/07
33.6
KC1.2
12/23/07
27.2
KC1.2
12/23/07
29.1
KC1.2
12/23/07
32.3
KC1.2
12/23/07
37.1
KC1.2
12/23/07
40.8
KC1.2
12/23/07
42
KC1.2
12/23/07
42.8
KC1.2
12/23/07
39.5
KC1.2
12/23/07
36.4
KC1.2
12/23/07
34.6
KC1.2
12/23/07
33.5
KC1.2
12/23/07
38.1
KC1.2
12/23/07
43.3
KC1.2
12/23/07
43.1
KC1.2
12/23/07
41.2
KC1.2
12/23/07
38.6
KC1.2
12/23/07
31.8
KC1.2
12/23/07
25.5
KC1.2
12/23/07
19
KC1.2
12/23/07
18.6
KC1.2
12/23/07
46.5
KC1.2
12/23/07
39.5
KC1.2
12/23/07
35.6
KC1.2
12/23/07
33.7
KC1.2
12/23/07
34.4
KC1.2
12/23/07
39.1
KC1.2
12/23/07
44.2
KC1.2
12/23/07
45.9
KC1.2
12/23/07
43.2
KC1.2
12/23/07
41
KC1.2
12/23/07
36.4
KC1.2
12/23/07
36.7
KC1.2
12/23/07
42.3
KC1.2
12/23/07
47.5
KC1.2
12/23/07
49.1
KC1.2
12/23/07
45.9
KC1.2
12/23/07
41.4
KC1.2
12/23/07
37.1
KC1.2
12/23/07
36.8
KC1.2
12/23/07
40.9
KC1.2
12/23/07
44
F-122

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
12/23/07
41.6
KC1.2
12/23/07
35.5
KC1.2
12/23/07
34.4
KC1.2
12/23/07
33.4
KC1.2
12/23/07
34.1
KC1.2
12/23/07
33.3
KC1.2
12/23/07
28.7
KC1.2
12/23/07
19.3
KC1.2
12/23/07
11.7
KC1.2
12/23/07
7.2
KC1.2
12/23/07
66.7
KC1.2
12/27/07
34.7
KC1.2
12/27/07
32.6
KC1.2
12/27/07
31.7
KC1.2
12/27/07
34.6
KC1.2
12/27/07
37.3
KC1.2
12/27/07
35.6
KC1.2
12/27/07
34.7
KC1.2
12/27/07
33.6
KC1.2
12/27/07
40.6
KC1.2
12/27/07
29.9
KC1.2
12/27/07
30.1
KC1.2
12/27/07
27.1
KC1.2
12/27/07
27.2
KC1.2
12/27/07
27.2
KC1.2
12/27/07
16
KC1.2
12/27/07
8.8
KC1.2
12/27/07
35.1
KC1.2
1 2/28/07
37.8
KC1.2
1 2/28/07
39.2
KC1.2
1 2/28/07
44.5
KC1.2
1 2/28/07
41.7
KC1.2
1 2/28/07
41.8
KC1.2
1 2/28/07
42.8
KC1.2
1 2/28/07
42.7
KC1.2
1 2/28/07
43.7
KC1.2
1 2/28/07
46.6
KC1.2
1 2/28/07
49.3
KC1.2
1 2/28/07
51.8
KC1.2
1 2/28/07
50
KC1.2
1 2/28/07
51
KC1.2
1 2/28/07
52.8
KC1.2
1 2/28/07
51
KC1.2
1 2/28/07
47.8
KC1.2
1 2/28/07
46.2
F-123

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
1 2/28/07
42.3
KC1.2
1 2/28/07
37.9
KC1.2
1 2/28/07
31.3
KC1.2
1 2/28/07
25.7
KC1.2
1 2/28/07
39.9
KC1.2
1 2/28/07
36.1
KC1.2
1 2/28/07
35.9
KC1.2
1 2/28/07
31.5
KC1.2
1 2/28/07
32.6
KC1.2
1 2/28/07
35.7
KC1.2
1 2/28/07
39.4
KC1.2
1 2/28/07
37.4
KC1.2
1 2/28/07
33
KC1.2
1 2/28/07
28.2
KC1.2
1 2/28/07
25.6
KC1.2
1 2/28/07
23.5
KC1.2
1 2/28/07
25.9
KC1.2
1 2/28/07
26.1
KC1.2
1 2/28/07
26.5
KC1.2
1 2/28/07
29.6
KC1.2
1 2/28/07
34.9
KC1.2
1 2/28/07
29.7
KC1.2
1 2/28/07
30.3
KC1.2
1 2/28/07
30.8
KC1.2
1 2/28/07
59.3
KC1.2
1 2/28/07
41.3
KC1.2
1 2/28/07
39.6
KC1.2
01/02/08
56.3
KC1.2
01/02/08
6.7
KC1.2
01/02/08
38
KC1.2
01/02/08
66.8
KC1.2
01/02/08
74.6
KC1.2
01/02/08
60.3
KC1.2
01/02/08
53.4
KC1.2
01/02/08
74
KC1.2
01/02/08
86.4
KC1.2
01/02/08
74.7
KC1.2
01/02/08
63.2
KC1.2
01/02/08
55.9
KC1.2
01/02/08
53.9
KC1.2
01/02/08
52.5
KC1.2
01/02/08
54.1
KC1.2
01/02/08
55.1
KC1.2
01/02/08
57.7
KC1.2
01/02/08
69.1
F-124

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/02/08
74.8
KC1.2
01/02/08
59.9
KC1.2
01/02/08
47.8
KC1.2
01/02/08
46
KC1.2
01/02/08
50.2
KC1.2
01/02/08
50.6
KC1.2
01/02/08
55.5
KC1.2
01/02/08
67.3
KC1.2
01/02/08
69.9
KC1.2
01/02/08
60.7
KC1.2
01/02/08
49.7
KC1.2
01/02/08
47.2
KC1.2
01/02/08
44.7
KC1.2
01/02/08
46.8
KC1.2
01/02/08
48
KC1.2
01/02/08
51.5
KC1.2
01/02/08
62.8
KC1.2
01/02/08
69.3
KC1.2
01/02/08
62.3
KC1.2
01/02/08
51.1
KC1.2
01/02/08
49.3
KC1.2
01/02/08
51.4
KC1.2
01/02/08
50.9
KC1.2
01/02/08
53.5
KC1.2
01/02/08
54.2
KC1.2
01/02/08
55.3
KC1.2
01/02/08
55.9
KC1.2
01/02/08
69.8
KC1.2
01/02/08
78.1
KC1.2
01/02/08
74.4
KC1.2
01/02/08
60.7
KC1.2
01/02/08
49.6
KC1.2
01/02/08
47.5
KC1.2
01/02/08
47
KC1.2
01/02/08
49.8
KC1.2
01/02/08
48.3
KC1.2
01/02/08
49
KC1.2
01/02/08
49.4
KC1.2
01/02/08
52.1
KC1.2
01/02/08
51.1
KC1.2
01/02/08
52
KC1.2
01/03/08
52.5
KC1.2
01/03/08
53.7
KC1.2
01/03/08
44.5
KC1.2
01/03/08
45.3
F-125

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/03/08
59
KC1.2
01/03/08
58.1
KC1.2
01/03/08
51.5
KC1.2
01/03/08
46.6
KC1.2
01/03/08
45.8
KC1.2
01/03/08
48.6
KC1.2
01/03/08
50.5
KC1.2
01/03/08
56
KC1.2
01/03/08
68.5
KC1.2
01/03/08
63.1
KC1.2
01/03/08
54.2
KC1.2
01/03/08
49.7
KC1.2
01/03/08
48.5
KC1.2
01/03/08
49.3
KC1.2
01/03/08
49.8
KC1.2
01/03/08
51.6
KC1.2
01/03/08
62.3
KC1.2
01/03/08
64.9
KC1.2
01/03/08
54.9
KC1.2
01/03/08
48.4
KC1.2
01/03/08
46
KC1.2
01/03/08
48.6
KC1.2
01/03/08
47.3
KC1.2
01/03/08
49
KC1.2
01/03/08
51.7
KC1.2
01/03/08
64.6
KC1.2
01/03/08
68.3
KC1.2
01/03/08
57.4
KC1.2
01/03/08
54.3
KC1.2
01/03/08
48.7
KC1.2
01/03/08
49.5
KC1.2
01/03/08
51.2
KC1.2
01/03/08
62.6
KC1.2
01/03/08
71.4
KC1.2
01/03/08
68.8
KC1.2
01/03/08
55.8
KC1.2
01/03/08
55.4
KC1.2
01/03/08
61.4
KC1.2
01/03/08
61.3
KC1.2
01/03/08
54.7
KC1.2
01/03/08
57.6
KC1.2
01/03/08
56.2
KC1.2
01/03/08
62.5
KC1.2
01/03/08
68.9
KC1.2
01/03/08
68.8
F-126

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/03/08
73.7
KC1.2
01/05/08
263.6
KC1.2
01/05/08
9.7
KC1.2
01/05/08
13.2
KC1.2
01/05/08
42.5
KC1.2
01/05/08
54.9
KC1.2
01/05/08
58.2
KC1.2
01/05/08
49.3
KC1.2
01/05/08
44.9
KC1.2
01/05/08
44.1
KC1.2
01/05/08
46.5
KC1.2
01/05/08
48.9
KC1.2
01/05/08
49.4
KC1.2
01/05/08
51.3
KC1.2
01/05/08
63.3
KC1.2
01/05/08
73.2
KC1.2
01/05/08
62.5
KC1.2
01/05/08
52.4
KC1.2
01/05/08
46.5
KC1.2
01/05/08
48.9
KC1.2
01/05/08
47.8
KC1.2
01/05/08
48.9
KC1.2
01/05/08
49.2
KC1.2
01/05/08
48.8
KC1.2
01/05/08
51.2
KC1.2
01/05/08
61.7
KC1.2
01/05/08
67.5
KC1.2
01/05/08
56.5
KC1.2
01/05/08
49.7
KC1.2
01/05/08
45.2
KC1.2
01/05/08
46.2
KC1.2
01/05/08
45.8
KC1.2
01/05/08
47.1
KC1.2
01/05/08
46.8
KC1.2
01/05/08
50
KC1.2
01/05/08
60.8
KC1.2
01/05/08
65
KC1.2
01/05/08
57.2
KC1.2
01/05/08
45.7
KC1.2
01/05/08
45.4
KC1.2
01/05/08
43.6
KC1.2
01/05/08
45.6
KC1.2
01/05/08
45.1
KC1.2
01/05/08
45.2
KC1.2
01/05/08
45.9
F-127

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/05/08
48
KC1.2
01/05/08
61.1
KC1.2
01/05/08
60.9
KC1.2
01/05/08
53.8
KC1.2
01/05/08
41.3
KC1.2
01/05/08
39.4
KC1.2
01/05/08
40
KC1.2
01/05/08
47.2
KC1.2
01/05/08
45.9
KC1.2
01/05/08
44.5
KC1.2
01/05/08
45.2
KC1.2
01/05/08
42
KC1.2
01/05/08
42.7
KC1.2
01/05/08
41.4
KC1.2
01/05/08
40
KC1.2
01/05/08
42.3
KC1.2
01/05/08
39.8
KC1.2
01/05/08
40.4
KC1.2
01/05/08
43.2
KC1.2
01/06/08
41.3
KC1.2
01/08/08
104.6
KC1.2
01/08/08
9.7
KC1.2
01/08/08
25.2
KC1.2
01/08/08
31.5
KC1.2
01/08/08
33.6
KC1.2
01/08/08
33.4
KC1.2
01/08/08
32.5
KC1.2
01/08/08
35.3
KC1.2
01/08/08
38.5
KC1.2
01/08/08
37.8
KC1.2
01/08/08
39.8
KC1.2
01/08/08
45.8
KC1.2
01/08/08
47.8
KC1.2
01/08/08
47.6
KC1.2
01/08/08
40.1
KC1.2
01/08/08
36
KC1.2
01/08/08
35.6
KC1.2
01/08/08
38.1
KC1.2
01/08/08
36.9
KC1.2
01/08/08
39.4
KC1.2
01/08/08
42.7
KC1.2
01/08/08
42.7
KC1.2
01/08/08
44.2
KC1.2
01/08/08
45.2
KC1.2
01/08/08
41.3
F-128

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/08/08
46
KC1.2
01/08/08
56.2
KC1.2
01/08/08
50.7
KC1.2
01/08/08
47.7
KC1.2
01/08/08
44.3
KC1.2
01/08/08
47.4
KC1.2
01/08/08
51.8
KC1.2
01/08/08
51.5
KC1.2
01/08/08
57.3
KC1.2
01/08/08
55.2
KC1.2
01/08/08
53.9
KC1.2
01/08/08
53.8
KC1.2
01/08/08
52.5
KC1.2
01/08/08
51.6
KC1.2
01/08/08
52.5
KC1.2
01/08/08
54.4
KC1.2
01/08/08
53.9
KC1.2
01/08/08
54.4
KC1.2
01/08/08
56.2
KC1.2
01/08/08
53.5
KC1.2
01/08/08
52.6
KC1.2
01/08/08
55.4
KC1.2
01/08/08
53.7
KC1.2
01/08/08
53.5
KC1.2
01/08/08
56.5
KC1.2
01/08/08
58.2
KC1.2
01/08/08
57.4
KC1.2
01/08/08
54.4
KC1.2
01/08/08
51.6
KC1.2
01/08/08
52
KC1.2
01/08/08
52.9
KC1.2
01/08/08
51.8
KC1.2
01/08/08
55.6
KC1.2
01/08/08
59
KC1.2
01/08/08
56.1
KC1.2
01/08/08
51.8
KC1.2
01/08/08
51.2
KC1.2
01/08/08
51.7
KC1.2
01/08/08
50.7
KC1.2
01/08/08
48.6
KC1.2
01/08/08
48.2
KC1.2
01/08/08
48
KC1.2
01/08/08
51.3
KC1.2
01/08/08
50.9
KC1.2
01/08/08
50.6
F-129

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/08/08
48.4
KC1.2
01/08/08
48
KC1.2
01/08/08
47.3
KC1.2
01/08/08
48.1
KC1.2
01/08/08
46.8
KC1.2
01/08/08
47.9
KC1.2
01/08/08
49.4
KC1.2
01/08/08
45.7
KC1.2
01/08/08
45.7
KC1.2
01/08/08
47.7
KC1.2
01/08/08
44.9
KC1.2
01/08/08
45.6
KC1.2
01/08/08
47
KC1.2
01/08/08
48.1
KC1.2
01/08/08
49.2
KC1.2
01/08/08
48.2
KC1.2
01/08/08
47.6
KC1.2
01/08/08
49.2
KC1.2
01/08/08
47.3
KC1.2
01/08/08
46.5
KC1.2
01/08/08
47.5
KC1.2
01/08/08
45.2
KC1.2
01/09/08
44.8
KC1.2
01/09/08
49.2
KC1.2
01/09/08
29.7
KC1.2
01/09/08
36.1
KC1.2
01/09/08
41.5
KC1.2
01/09/08
43.7
KC1.2
01/09/08
48.1
KC1.2
01/09/08
51.6
KC1.2
01/09/08
51.2
KC1.2
01/09/08
51.3
KC1.2
01/09/08
48.8
KC1.2
01/09/08
48.1
KC1.2
01/09/08
49.4
KC1.2
01/09/08
46.8
KC1.2
01/09/08
47.5
KC1.2
01/09/08
49.2
KC1.2
01/09/08
47.9
KC1.2
01/09/08
46.2
KC1.2
01/09/08
46.1
KC1.2
01/09/08
44.2
KC1.2
01/09/08
45.1
KC1.2
01/09/08
45.7
KC1.2
01/09/08
44
F-130

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/09/08
47
KC1.2
01/09/08
46.2
KC1.2
01/09/08
46.7
KC1.2
01/09/08
48.8
KC1.2
01/09/08
49.2
KC1.2
01/09/08
51.3
KC1.2
01/09/08
49.4
KC1.2
01/09/08
50.1
KC1.2
01/09/08
48.4
KC1.2
01/09/08
47.1
KC1.2
01/09/08
47.8
KC1.2
01/09/08
45
KC1.2
01/09/08
47.5
KC1.2
01/09/08
49.8
KC1.2
01/09/08
47.8
KC1.2
01/09/08
48.9
KC1.2
01/09/08
46.5
KC1.2
01/09/08
46.1
KC1.2
01/09/08
48.2
KC1.2
01/09/08
49.2
KC1.2
01/09/08
54.3
KC1.2
01/09/08
60.9
KC1.2
01/09/08
63.9
KC1.2
01/09/08
70.7
KC1.2
01/09/08
74.8
KC1.2
01/09/08
77.7
KC1.2
01/09/08
81.9
KC1.2
01/09/08
82.7
KC1.2
01/09/08
84.6
KC1.2
01/09/08
83.8
KC1.2
01/09/08
78.6
KC1.2
01/09/08
75.3
KC1.2
01/09/08
67.4
KC1.2
01/09/08
64.1
KC1.2
01/09/08
57.4
KC1.2
01/09/08
55.4
KC1.2
01/09/08
51.1
KC1.2
01/09/08
50
KC1.2
01/09/08
48.1
KC1.2
01/09/08
46.3
KC1.2
01/09/08
47.4
KC1.2
01/09/08
43.6
KC1.2
01/09/08
45
KC1.2
01/09/08
42.4
KC1.2
01/09/08
41.6
F-131

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/09/08
43.9
KC1.2
01/09/08
41.4
KC1.2
01/09/08
43.6
KC1.2
01/09/08
41.2
KC1.2
01/09/08
43.4
KC1.2
01/09/08
41.9
KC1.2
01/09/08
44.8
KC1.2
01/09/08
42.5
KC1.2
01/09/08
44.4
KC1.2
01/09/08
41.7
KC1.2
01/09/08
43.6
KC1.2
01/09/08
40.6
KC1.2
01/09/08
42
KC1.2
01/09/08
41.2
KC1.2
01/09/08
41.1
KC1.2
01/09/08
41
KC1.2
01/09/08
40.8
KC1.2
01/09/08
41.2
KC1.2
01/09/08
39.7
KC1.2
01/09/08
41.1
KC1.2
01/09/08
40.6
KC1.2
01/09/08
48.4
KC1.2
01/09/08
57.9
KC1.2
01/09/08
71
KC1.2
01/09/08
85.4
KC1.2
01/10/08
103.2
KC1.2
01/10/08
109.4
KC1.2
01/10/08
60.9
KC1.2
01/10/08
58.1
KC1.2
01/10/08
69
KC1.2
01/10/08
75.9
KC1.2
01/10/08
82.1
KC1.2
01/10/08
85
KC1.2
01/10/08
82.2
KC1.2
01/10/08
78.5
KC1.2
01/10/08
73.7
KC1.2
01/10/08
71.9
KC1.2
01/10/08
67.6
KC1.2
01/10/08
67.3
KC1.2
01/10/08
64.3
KC1.2
01/10/08
65.3
KC1.2
01/10/08
65.6
KC1.2
01/10/08
64.1
KC1.2
01/10/08
65
KC1.2
01/10/08
62.8
F-132

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/10/08
60.2
KC1.2
01/10/08
59.6
KC1.2
01/10/08
57.2
KC1.2
01/10/08
58.7
KC1.2
01/10/08
56.3
KC1.2
01/10/08
56.1
KC1.2
01/10/08
53.6
KC1.2
01/10/08
54
KC1.2
01/10/08
53.2
KC1.2
01/10/08
53.9
KC1.2
01/10/08
56.1
KC1.2
01/10/08
55.7
KC1.2
01/10/08
56.7
KC1.2
01/10/08
59.8
KC1.2
01/10/08
57.1
KC1.2
01/10/08
56.9
KC1.2
01/10/08
58
KC1.2
01/10/08
56.4
KC1.2
01/10/08
60
KC1.2
01/10/08
57.6
KC1.2
01/10/08
56.6
KC1.2
01/10/08
59.8
KC1.2
01/10/08
32.4
KC1.2
01/10/08
27.2
KC1.2
01/10/08
35.9
KC1.2
01/10/08
44.1
KC1.2
01/10/08
48.1
KC1.2
01/10/08
51.7
KC1.2
01/10/08
54.7
KC1.2
01/10/08
53.9
KC1.2
01/10/08
54.8
KC1.2
01/10/08
56.1
KC1.2
01/10/08
55
KC1.2
01/10/08
56.7
KC1.2
01/10/08
57.7
KC1.2
01/10/08
56.7
KC1.2
01/10/08
59.5
KC1.2
01/10/08
62.5
KC1.2
01/10/08
61.1
KC1.2
01/10/08
61.8
KC1.2
01/10/08
61.6
KC1.2
01/10/08
64.1
KC1.2
01/10/08
66.5
KC1.2
01/10/08
71.7
KC1.2
01/10/08
72.6
F-133

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/10/08
70.5
KC1.2
01/10/08
72.8
KC1.2
01/10/08
70.8
KC1.2
01/10/08
67.6
KC1.2
01/10/08
66.9
KC1.2
01/10/08
65.6
KC1.2
01/10/08
63.7
KC1.2
01/10/08
63.5
KC1.2
01/11/08
62
KC1.2
01/11/08
63.2
KC1.2
01/11/08
43.4
KC1.2
01/11/08
38.5
KC1.2
01/11/08
44.6
KC1.2
01/11/08
54.4
KC1.2
01/11/08
59.4
KC1.2
01/11/08
58.3
KC1.2
01/11/08
59.4
KC1.2
01/11/08
60
KC1.2
01/11/08
57.8
KC1.2
01/11/08
58
KC1.2
01/11/08
57.7
KC1.2
01/11/08
55.7
KC1.2
01/11/08
56.8
KC1.2
01/11/08
55.3
KC1.2
01/11/08
52.1
KC1.2
01/11/08
52.1
KC1.2
01/11/08
54.4
KC1.2
01/11/08
54.6
KC1.2
01/11/08
57.4
KC1.2
01/11/08
55
KC1.2
01/11/08
53.4
KC1.2
01/11/08
55.5
KC1.2
01/11/08
54.8
KC1.2
01/11/08
52.7
KC1.2
01/11/08
53.3
KC1.2
01/11/08
50.6
KC1.2
01/11/08
51.5
KC1.2
01/11/08
54.1
KC1.2
01/11/08
53.6
KC1.2
01/11/08
56.1
KC1.2
01/11/08
58.1
KC1.2
01/11/08
57.1
KC1.2
01/11/08
57.6
KC1.2
01/11/08
56.6
KC1.2
01/11/08
56
F-134

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/11/08
57.8
KC1.2
01/11/08
56.5
KC1.2
01/11/08
54.6
KC1.2
01/11/08
55.3
KC1.2
01/11/08
53.3
KC1.2
01/11/08
54.4
KC1.2
01/11/08
55.1
KC1.2
01/11/08
53.7
KC1.2
01/11/08
59.1
KC1.2
01/11/08
59.7
KC1.2
01/11/08
58.1
KC1.2
01/11/08
58.1
KC1.2
01/11/08
58.3
KC1.2
01/11/08
57.6
KC1.2
01/11/08
57
KC1.2
01/11/08
56.5
KC1.2
01/11/08
56.5
KC1.2
01/11/08
56.2
KC1.2
01/11/08
53.5
KC1.2
01/11/08
55
KC1.2
01/11/08
55.1
KC1.2
01/11/08
53.2
KC1.2
01/11/08
54.2
KC1.2
01/11/08
53.4
KC1.2
01/11/08
53.2
KC1.2
01/11/08
54.3
KC1.2
01/11/08
53.7
KC1.2
01/11/08
52.8
KC1.2
01/11/08
55.5
KC1.2
01/11/08
59.3
KC1.2
01/11/08
53.5
KC1.2
01/11/08
52.4
KC1.2
01/11/08
50.8
KC1.2
01/11/08
54.4
KC1.2
01/11/08
51.7
KC1.2
01/11/08
53.1
KC1.2
01/11/08
52.3
KC1.2
01/11/08
50.4
KC1.2
01/11/08
52.1
KC1.2
01/11/08
49
KC1.2
01/11/08
50.6
KC1.2
01/11/08
48.5
KC1.2
01/11/08
50.4
KC1.2
01/11/08
48.6
KC1.2
01/11/08
47.6
F-135

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/11/08
50.6
KC1.2
01/11/08
48
KC1.2
01/11/08
50.1
KC1.2
01/11/08
49.3
KC1.2
01/11/08
50.7
KC1.2
01/11/08
47.6
KC1.2
01/11/08
48.9
KC1.2
01/11/08
46.9
KC1.2
01/11/08
48.4
KC1.2
01/11/08
47.4
KC1.2
01/11/08
47.6
KC1.2
01/11/08
46.8
KC1.2
01/1 2/08
46.1
KC1.2
01/1 2/08
45
KC1.2
01/1 2/08
33.1
KC1.2
01/1 2/08
32
KC1.2
01/1 2/08
34.1
KC1.2
01/1 2/08
40.7
KC1.2
01/1 2/08
41.4
KC1.2
01/1 2/08
45.7
KC1.2
01/1 2/08
44.1
KC1.2
01/1 2/08
44
KC1.2
01/1 2/08
46.5
KC1.2
01/1 2/08
43.3
KC1.2
01/1 2/08
44.3
KC1.2
01/1 2/08
44.8
KC1.2
01/1 2/08
47.3
KC1.2
01/1 2/08
41.6
KC1.2
01/1 2/08
39.3
KC1.2
01/1 2/08
160.6
KC1.2
01/1 2/08
154.4
KC1.2
01/1 2/08
133.2
KC1.2
01/1 2/08
119.2
KC1.2
01/1 2/08
114.5
KC1.2
01/1 2/08
99.3
KC1.2
01/1 2/08
83.9
KC1.2
01/1 2/08
70.1
KC1.2
01/1 2/08
67.6
KC1.2
01/1 2/08
61
KC1.2
01/1 2/08
64.5
KC1.2
01/1 2/08
51.7
KC1.2
01/1 2/08
38.6
KC1.2
01/1 2/08
35.5
KC1.2
01/1 2/08
95.1
KC1.2
01/1 2/08
105.6
F-136

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/1 2/08
113.8
KC1.2
01/1 2/08
124.7
KC1.2
01/12/08
131
KC1.2
01/1 2/08
134.3
KC1.2
01/1 2/08
134.9
KC1.2
01/1 2/08
133.4
KC1.2
01/1 2/08
131.6
KC1.2
01/1 2/08
131.1
KC1.2
01/12/08
102
KC1.2
01/1 2/08
64.4
KC1.2
01/1 2/08
94.8
KC1.2
01/1 2/08
132.8
KC1.2
01/1 2/08
208.9
KC1.2
01/1 2/08
209.2
KC1.2
01/1 2/08
163.4
KC1.2
01/12/08
101
KC1.2
01/1 2/08
93.6
KC1.2
01/12/08
104
KC1.2
01/1 2/08
90.7
KC1.2
01/1 2/08
87.4
KC1.2
01/1 2/08
81.5
KC1.2
01/1 2/08
76.3
KC1.2
01/1 2/08
76.1
KC1.2
01/1 2/08
72.9
KC1.2
01/1 2/08
61.8
KC1.2
01/1 2/08
60.3
KC1.2
01/1 2/08
71.3
KC1.2
01/1 2/08
69.4
KC1.2
01/1 2/08
70.3
KC1.2
01/1 2/08
70.6
KC1.2
01/1 2/08
69
KC1.2
01/1 2/08
68.7
KC1.2
01/1 2/08
66.2
KC1.2
01/1 2/08
65.2
KC1.2
01/14/08
49.4
KC1.2
01/14/08
10.9
KC1.2
01/14/08
25.4
KC1.2
01/14/08
52.3
KC1.2
01/14/08
51.5
KC1.2
01/14/08
40.6
KC1.2
01/14/08
42
KC1.2
01/14/08
52.7
KC1.2
01/14/08
43.3
KC1.2
01/14/08
36.9
KC1.2
01/14/08
46.7
F-137

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/14/08
47.2
KC1.2
01/14/08
43.7
KC1.2
01/14/08
43.1
KC1.2
01/14/08
39.7
KC1.2
01/14/08
35.5
KC1.2
01/14/08
36.4
KC1.2
01/14/08
41.5
KC1.2
01/14/08
41.3
KC1.2
01/14/08
43.7
KC1.2
01/14/08
48.4
KC1.2
01/14/08
51.2
KC1.2
01/14/08
60.5
KC1.2
01/14/08
63.8
KC1.2
01/14/08
63.2
KC1.2
01/14/08
80.2
KC1.2
01/14/08
88.7
KC1.2
01/14/08
93
KC1.2
01/14/08
94.2
KC1.2
01/14/08
92.6
KC1.2
01/14/08
87.4
KC1.2
01/14/08
82.6
KC1.2
01/14/08
74.8
KC1.2
01/14/08
70.2
KC1.2
01/14/08
61.8
KC1.2
01/14/08
58
KC1.2
01/14/08
56
KC1.2
01/14/08
50
KC1.2
01/14/08
46.4
KC1.2
01/14/08
46.7
KC1.2
01/14/08
38.2
KC1.2
01/14/08
36
KC1.2
01/14/08
31.6
KC1.2
01/14/08
32
KC1.2
01/14/08
53.2
KC1.2
01/14/08
54.4
KC1.2
01/14/08
56.8
KC1.2
01/14/08
52.1
KC1.2
01/14/08
52.7
KC1.2
01/14/08
50.6
KC1.2
01/14/08
53.7
KC1.2
01/14/08
51.3
KC1.2
01/14/08
54.4
KC1.2
01/14/08
51.6
KC1.2
01/14/08
53.1
KC1.2
01/14/08
47.9
F-138

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/14/08
41.1
KC1.2
01/14/08
37.9
KC1.2
01/14/08
50.3
KC1.2
01/14/08
55
KC1.2
01/14/08
66.6
KC1.2
01/14/08
57.2
KC1.2
01/14/08
52.8
KC1.2
01/14/08
46.9
KC1.2
01/15/08
46
KC1.2
01/15/08
41
KC1.2
01/15/08
26.1
KC1.2
01/15/08
31.6
KC1.2
01/15/08
35.9
KC1.2
01/15/08
44
KC1.2
01/15/08
46.3
KC1.2
01/15/08
50.8
KC1.2
01/15/08
45.6
KC1.2
01/15/08
42
KC1.2
01/15/08
50.4
KC1.2
01/15/08
58.6
KC1.2
01/15/08
59.5
KC1.2
01/15/08
50.9
KC1.2
01/15/08
51.3
KC1.2
01/15/08
47.7
KC1.2
01/15/08
50.1
KC1.2
01/15/08
44.7
KC1.2
01/15/08
42.8
KC1.2
01/15/08
41.2
KC1.2
01/15/08
44.9
KC1.2
01/15/08
46.8
KC1.2
01/15/08
43.6
KC1.2
01/15/08
41.3
KC1.2
01/15/08
40.2
KC1.2
01/15/08
46.4
KC1.2
01/15/08
45.3
KC1.2
01/15/08
49.1
KC1.2
01/15/08
46.3
KC1.2
01/15/08
49.4
KC1.2
01/15/08
47.1
KC1.2
01/15/08
47.2
KC1.2
01/15/08
45.2
KC1.2
01/15/08
43.6
KC1.2
01/15/08
37.2
KC1.2
01/15/08
42.6
KC1.2
01/15/08
43.3
F-139

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/15/08
47.8
KC1.2
01/15/08
45.7
KC1.2
01/15/08
48.8
KC1.2
01/15/08
46
KC1.2
01/15/08
44.6
KC1.2
01/15/08
43.6
KC1.2
01/15/08
36.1
KC1.2
01/15/08
36.9
KC1.2
01/15/08
38.4
KC1.2
01/15/08
44
KC1.2
01/15/08
41.1
KC1.2
01/15/08
45.1
KC1.2
01/15/08
41.5
KC1.2
01/15/08
40.2
KC1.2
01/15/08
35.8
KC1.2
01/15/08
36.8
KC1.2
01/15/08
41.4
KC1.2
01/15/08
39.3
KC1.2
01/15/08
37.4
KC1.2
01/15/08
38.8
KC1.2
01/15/08
30.9
KC1.2
01/15/08
31.1
KC1.2
01/15/08
29.9
KC1.2
01/15/08
27
KC1.2
01/24/08
55.8
KC1.2
01/24/08
8.7
KC1.2
01/24/08
10.3
KC1.2
01/24/08
19.6
KC1.2
01/24/08
22.3
KC1.2
01/24/08
25.5
KC1.2
01/24/08
29.5
KC1.2
01/24/08
31.6
KC1.2
01/24/08
30.9
KC1.2
01/24/08
31.2
KC1.2
01/24/08
36.1
KC1.2
01/24/08
39.4
KC1.2
01/24/08
41.8
KC1.2
01/24/08
43.8
KC1.2
01/24/08
45.8
KC1.2
01/24/08
47.6
KC1.2
01/24/08
49
KC1.2
01/24/08
49.8
KC1.2
01/24/08
50.3
KC1.2
01/24/08
49.1
KC1.2
01/24/08
48.5
F-140

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/24/08
48.3
KC1.2
01/24/08
49.5
KC1.2
01/24/08
50
KC1.2
01/24/08
49.3
KC1.2
01/24/08
48.6
KC1.2
01/24/08
48.3
KC1.2
01/24/08
48.1
KC1.2
01/24/08
48
KC1.2
01/24/08
48.3
KC1.2
01/24/08
48.1
KC1.2
01/24/08
48.2
KC1.2
01/24/08
48
KC1.2
01/25/08
48.2
KC1.2
01/25/08
48.3
KC1.2
01/25/08
50.8
KC1.2
01/25/08
46
KC1.2
01/25/08
45.8
KC1.2
01/25/08
46.3
KC1.2
01/25/08
48.6
KC1.2
01/25/08
51.2
KC1.2
01/25/08
54.4
KC1.2
01/25/08
51.4
KC1.2
01/25/08
49.1
KC1.2
01/25/08
48.2
KC1.2
01/25/08
47.2
KC1.2
01/25/08
46.6
KC1.2
01/25/08
47.4
KC1.2
01/25/08
48.1
KC1.2
01/25/08
48.3
KC1.2
01/25/08
48.6
KC1.2
01/25/08
49.8
KC1.2
01/25/08
51.4
KC1.2
01/25/08
50.9
KC1.2
01/28/08
9.2
KC1.2
01/28/08
9.2
KC1.2
01/28/08
28.1
KC1.2
01/28/08
35.4
KC1.2
01/28/08
41.5
KC1.2
01/28/08
50
KC1.2
01/28/08
54.5
KC1.2
01/28/08
55.9
KC1.2
01/28/08
53.8
KC1.2
01/28/08
52
KC1.2
01/28/08
55.5
KC1.2
01/28/08
57.3
F-141

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/28/08
58.2
KC1.2
01/28/08
56.3
KC1.2
01/28/08
53.5
KC1.2
01/28/08
54.1
KC1.2
01/29/08
53.6
KC1.2
01/29/08
51.6
KC1.2
01/29/08
101.9
KC1.2
01/29/08
39
KC1.2
01/29/08
33.9
KC1.2
01/29/08
33.3
KC1.2
01/29/08
36
KC1.2
01/29/08
42.7
KC1.2
01/29/08
43.7
KC1.2
01/29/08
50.3
KC1.2
01/29/08
47
KC1.2
01/29/08
50.7
KC1.2
01/29/08
47
KC1.2
01/29/08
49.9
KC1.2
01/29/08
44.8
KC1.2
01/29/08
44.8
KC1.2
01/29/08
38.1
KC1.2
01/29/08
42.2
KC1.2
01/29/08
43.7
KC1.2
01/29/08
44.3
KC1.2
01/29/08
47.2
KC1.2
01/29/08
46.4
KC1.2
01/29/08
52.6
KC1.2
01/29/08
28
KC1.2
01/29/08
28.1
KC1.2
01/29/08
32.1
KC1.2
01/29/08
41.1
KC1.2
01/29/08
39.4
KC1.2
01/29/08
45
KC1.2
01/29/08
45.9
KC1.2
01/29/08
46.6
KC1.2
01/29/08
48.8
KC1.2
01/29/08
47.9
KC1.2
01/29/08
50.2
KC1.2
01/29/08
49.8
KC1.2
01/29/08
47.1
KC1.2
01/29/08
42.4
KC1.2
01/29/08
36.8
KC1.2
01/29/08
43.4
KC1.2
01/29/08
44.3
KC1.2
01/29/08
48.2
F-142

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/29/08
46.9
KC1.2
01/29/08
49.8
KC1.2
01/29/08
46.7
KC1.2
01/29/08
49.8
KC1.2
01/29/08
47.6
KC1.2
01/29/08
49.1
KC1.2
01/29/08
48.9
KC1.2
01/29/08
47.4
KC1.2
01/29/08
48.4
KC1.2
01/29/08
42.5
KC1.2
01/29/08
39.7
KC1.2
01/29/08
34
KC1.2
01/29/08
46.6
KC1.2
01/29/08
48.6
KC1.2
01/29/08
49.1
KC1.2
01/29/08
47
KC1.2
01/29/08
46.2
KC1.2
01/29/08
47
KC1.2
01/29/08
50.1
KC1.2
01/29/08
52.9
KC1.2
01/29/08
53.3
KC1.2
01/30/08
19
KC1.2
01/30/08
23.9
KC1.2
01/30/08
13.8
KC1.2
01/30/08
22.7
KC1.2
01/30/08
25.3
KC1.2
01/30/08
25.3
KC1.2
01/30/08
26.3
KC1.2
01/30/08
28.3
KC1.2
01/30/08
26.9
KC1.2
01/30/08
28.9
KC1.2
01/30/08
25.6
KC1.2
01/30/08
27.3
KC1.2
01/30/08
26
KC1.2
01/30/08
29.4
KC1.2
01/30/08
26.6
KC1.2
01/30/08
29.4
KC1.2
01/30/08
27.6
KC1.2
01/30/08
27.8
KC1.2
01/30/08
28.1
KC1.2
01/30/08
28.4
KC1.2
01/30/08
40.7
KC1.2
01/30/08
19.5
KC1.2
01/30/08
23.4
KC1.2
01/30/08
19.2
F-143

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.2
01/30/08
25.5
KC1.2
01/30/08
25.8
KC1.2
01/30/08
35
KC1.2
01/30/08
37.9
KC1.2
01/30/08
47.4
KC1.2
01/30/08
47
KC1.2
01/30/08
52.4
KC1.2
01/30/08
50.4
KC1.2
01/30/08
54
KC1.2
01/30/08
51
KC1.2
01/30/08
53.9
KC1.2
01/30/08
49.8
KC1.2
01/30/08
51.9
KC1.2
01/30/08
45.5
KC1.2
01/30/08
45.1
KC1.2
01/30/08
46.8
KC1.2
01/30/08
51.1
KC1.2
01/30/08
49.8
KC1.2
01/30/08
55.4
KC1.2
01/30/08
55.2
KC1.2
01/30/08
60.6
KC1.2
01/30/08
58.4
KC1.2
01/30/08
61.1
KC1.2
01/30/08
59.3
KC1.2
01/30/08
58.5
KC1.2
01/30/08
57.3
KC1.3
01/02/08
58.3
KC1.3
01/02/08
7.2
KC1.3
01/02/08
40.1
KC1.3
01/02/08
66.2
KC1.3
01/02/08
70.4
KC1.3
01/02/08
56.3
KC1.3
01/02/08
54.7
KC1.3
01/02/08
74.3
KC1.3
01/02/08
83.8
KC1.3
01/02/08
69.4
KC1.3
01/02/08
58.7
KC1.3
01/02/08
54.9
KC1.3
01/02/08
53.9
KC1.3
01/02/08
52.3
KC1.3
01/02/08
52.8
KC1.3
01/02/08
56
KC1.3
01/02/08
58.5
KC1.3
01/02/08
69.6
KC1.3
01/02/08
72.8
F-144

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/02/08
57.1
KC1.3
01/02/08
47.4
KC1.3
01/02/08
46.1
KC1.3
01/02/08
49.5
KC1.3
01/02/08
51.3
KC1.3
01/02/08
56.7
KC1.3
01/02/08
67.8
KC1.3
01/02/08
68.6
KC1.3
01/02/08
59.8
KC1.3
01/02/08
48.6
KC1.3
01/02/08
44.6
KC1.3
01/02/08
45.4
KC1.3
01/02/08
46.8
KC1.3
01/02/08
48.2
KC1.3
01/02/08
52.2
KC1.3
01/02/08
63.6
KC1.3
01/02/08
69.3
KC1.3
01/02/08
59.2
KC1.3
01/02/08
50.4
KC1.3
01/02/08
49.7
KC1.3
01/02/08
49.1
KC1.3
01/02/08
52
KC1.3
01/02/08
54.1
KC1.3
01/02/08
54.2
KC1.3
01/02/08
54
KC1.3
01/02/08
57.7
KC1.3
01/02/08
70.2
KC1.3
01/02/08
78.6
KC1.3
01/02/08
73.7
KC1.3
01/02/08
58.1
KC1.3
01/02/08
50.4
KC1.3
01/02/08
45.9
KC1.3
01/02/08
46.3
KC1.3
01/02/08
47.6
KC1.3
01/02/08
48.4
KC1.3
01/02/08
49.6
KC1.3
01/02/08
51.2
KC1.3
01/02/08
50.2
KC1.3
01/02/08
52
KC1.3
01/02/08
53.1
KC1.3
01/03/08
53.3
KC1.3
01/03/08
39.8
KC1.3
01/03/08
45.5
KC1.3
01/03/08
58.9
KC1.3
01/03/08
56.4
F-145

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/03/08
49.5
KC1.3
01/03/08
46.8
KC1.3
01/03/08
46.3
KC1.3
01/03/08
48.7
KC1.3
01/03/08
51
KC1.3
01/03/08
57.4
KC1.3
01/03/08
66.9
KC1.3
01/03/08
63.1
KC1.3
01/03/08
52.5
KC1.3
01/03/08
49.5
KC1.3
01/03/08
46.6
KC1.3
01/03/08
49.9
KC1.3
01/03/08
51.3
KC1.3
01/03/08
53.2
KC1.3
01/03/08
63.2
KC1.3
01/03/08
63.3
KC1.3
01/03/08
53.9
KC1.3
01/03/08
47.2
KC1.3
01/03/08
45.7
KC1.3
01/03/08
47.3
KC1.3
01/03/08
49.1
KC1.3
01/03/08
49.8
KC1.3
01/03/08
52.4
KC1.3
01/03/08
66.5
KC1.3
01/03/08
67.8
KC1.3
01/03/08
56.7
KC1.3
01/03/08
51.6
KC1.3
01/03/08
50.5
KC1.3
01/03/08
51.3
KC1.3
01/03/08
52.7
KC1.3
01/03/08
63.9
KC1.3
01/03/08
74.8
KC1.3
01/03/08
68.3
KC1.3
01/03/08
56.5
KC1.3
01/03/08
54
KC1.3
01/03/08
62.4
KC1.3
01/03/08
62
KC1.3
01/03/08
57.1
KC1.3
01/03/08
59.5
KC1.3
01/03/08
56.2
KC1.3
01/03/08
65.6
KC1.3
01/03/08
71.4
KC1.3
01/03/08
69.6
KC1.3
01/03/08
76.6
KC1.3
01/05/08
103.6
F-146

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/05/08
6.6
KC1.3
01/05/08
15.7
KC1.3
01/05/08
42
KC1.3
01/05/08
56.2
KC1.3
01/05/08
56.9
KC1.3
01/05/08
49.1
KC1.3
01/05/08
44.9
KC1.3
01/05/08
44.6
KC1.3
01/05/08
47.3
KC1.3
01/05/08
48.6
KC1.3
01/05/08
50.9
KC1.3
01/05/08
51.2
KC1.3
01/05/08
65.5
KC1.3
01/05/08
73
KC1.3
01/05/08
62.1
KC1.3
01/05/08
52.5
KC1.3
01/05/08
47.8
KC1.3
01/05/08
48
KC1.3
01/05/08
49.5
KC1.3
01/05/08
48.7
KC1.3
01/05/08
49.7
KC1.3
01/05/08
50.2
KC1.3
01/05/08
51.1
KC1.3
01/05/08
63.6
KC1.3
01/05/08
67.7
KC1.3
01/05/08
56.9
KC1.3
01/05/08
49
KC1.3
01/05/08
46.9
KC1.3
01/05/08
45.4
KC1.3
01/05/08
47.1
KC1.3
01/05/08
48.2
KC1.3
01/05/08
47.5
KC1.3
01/05/08
50.5
KC1.3
01/05/08
62.9
KC1.3
01/05/08
65.1
KC1.3
01/05/08
56
KC1.3
01/05/08
47.6
KC1.3
01/05/08
44.5
KC1.3
01/05/08
44.9
KC1.3
01/05/08
46.4
KC1.3
01/05/08
45.9
KC1.3
01/05/08
46.5
KC1.3
01/05/08
46.4
KC1.3
01/05/08
50.3
KC1.3
01/05/08
61
F-147

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/05/08
63.4
KC1.3
01/05/08
52
KC1.3
01/05/08
41.6
KC1.3
01/05/08
39.1
KC1.3
01/05/08
41.5
KC1.3
01/05/08
46.4
KC1.3
01/05/08
47.8
KC1.3
01/05/08
45.7
KC1.3
01/05/08
44.3
KC1.3
01/05/08
44.4
KC1.3
01/05/08
42
KC1.3
01/05/08
41.5
KC1.3
01/05/08
41.9
KC1.3
01/05/08
41.4
KC1.3
01/05/08
41.3
KC1.3
01/05/08
43.1
KC1.3
01/05/08
42.1
KC1.3
01/06/08
44.4
KC1.3
01/08/08
32.8
KC1.3
01/08/08
9.8
KC1.3
01/08/08
21.8
KC1.3
01/08/08
31.5
KC1.3
01/08/08
33.5
KC1.3
01/08/08
33.3
KC1.3
01/08/08
32.3
KC1.3
01/08/08
35.7
KC1.3
01/08/08
38.3
KC1.3
01/08/08
38.4
KC1.3
01/08/08
40.1
KC1.3
01/08/08
46.1
KC1.3
01/08/08
48.6
KC1.3
01/08/08
45.6
KC1.3
01/08/08
41
KC1.3
01/08/08
36.1
KC1.3
01/08/08
36
KC1.3
01/08/08
36.4
KC1.3
01/08/08
39.4
KC1.3
01/08/08
39.4
KC1.3
01/08/08
40.5
KC1.3
01/08/08
46
KC1.3
01/08/08
43.3
KC1.3
01/08/08
42.3
KC1.3
01/08/08
42.2
KC1.3
01/08/08
50.1
KC1.3
01/08/08
54.5
F-148

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/08/08
51.8
KC1.3
01/08/08
47.7
KC1.3
01/08/08
44.7
KC1.3
01/08/08
48.3
KC1.3
01/08/08
51.4
KC1.3
01/08/08
55
KC1.3
01/08/08
56.1
KC1.3
01/08/08
55.9
KC1.3
01/08/08
55.1
KC1.3
01/08/08
55.4
KC1.3
01/08/08
52.1
KC1.3
01/08/08
52.6
KC1.3
01/08/08
53.3
KC1.3
01/08/08
55.5
KC1.3
01/08/08
56
KC1.3
01/08/08
55.1
KC1.3
01/08/08
55.2
KC1.3
01/08/08
55.2
KC1.3
01/08/08
55.4
KC1.3
01/08/08
54
KC1.3
01/08/08
55.3
KC1.3
01/08/08
54.3
KC1.3
01/08/08
57.1
KC1.3
01/08/08
60.4
KC1.3
01/08/08
58.1
KC1.3
01/08/08
53.6
KC1.3
01/08/08
54.5
KC1.3
01/08/08
51.9
KC1.3
01/08/08
52.7
KC1.3
01/08/08
53.1
KC1.3
01/08/08
57.7
KC1.3
01/08/08
59.4
KC1.3
01/08/08
55.9
KC1.3
01/08/08
51.6
KC1.3
01/08/08
52.2
KC1.3
01/08/08
53.8
KC1.3
01/08/08
49.8
KC1.3
01/08/08
47.9
KC1.3
01/08/08
48.6
KC1.3
01/08/08
49.1
KC1.3
01/08/08
49.8
KC1.3
01/08/08
51.7
KC1.3
01/08/08
50.4
KC1.3
01/08/08
49.2
KC1.3
01/08/08
48.1
F-149

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/08/08
47.7
KC1.3
01/08/08
46.7
KC1.3
01/08/08
49.1
KC1.3
01/08/08
48
KC1.3
01/08/08
47.5
KC1.3
01/08/08
46.2
KC1.3
01/08/08
47
KC1.3
01/08/08
45.8
KC1.3
01/08/08
45.5
KC1.3
01/08/08
46.3
KC1.3
01/08/08
46.4
KC1.3
01/08/08
48.7
KC1.3
01/08/08
49.1
KC1.3
01/08/08
49.1
KC1.3
01/08/08
47.4
KC1.3
01/08/08
47.9
KC1.3
01/08/08
48
KC1.3
01/08/08
47.5
KC1.3
01/08/08
46.4
KC1.3
01/08/08
46.4
KC1.3
01/09/08
46
KC1.3
01/09/08
40.8
KC1.3
01/09/08
31.4
KC1.3
01/09/08
34.8
KC1.3
01/09/08
38.9
KC1.3
01/09/08
44.2
KC1.3
01/09/08
49.9
KC1.3
01/09/08
49.7
KC1.3
01/09/08
51.2
KC1.3
01/09/08
49.3
KC1.3
01/09/08
50.2
KC1.3
01/09/08
46.7
KC1.3
01/09/08
46.7
KC1.3
01/09/08
46.2
KC1.3
01/09/08
47.4
KC1.3
01/09/08
46.5
KC1.3
01/09/08
46.8
KC1.3
01/09/08
45.4
KC1.3
01/09/08
44.8
KC1.3
01/09/08
43
KC1.3
01/09/08
44.2
KC1.3
01/09/08
43.7
KC1.3
01/09/08
45.2
KC1.3
01/09/08
44.3
KC1.3
01/09/08
45.7
F-150

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/09/08
46.3
KC1.3
01/09/08
47.3
KC1.3
01/09/08
48.7
KC1.3
01/09/08
49.2
KC1.3
01/09/08
50.5
KC1.3
01/09/08
47.8
KC1.3
01/09/08
46.7
KC1.3
01/09/08
46.4
KC1.3
01/09/08
46.4
KC1.3
01/09/08
44.4
KC1.3
01/09/08
47.1
KC1.3
01/09/08
47.4
KC1.3
01/09/08
49.3
KC1.3
01/09/08
45.5
KC1.3
01/09/08
45.7
KC1.3
01/09/08
44.6
KC1.3
01/09/08
46.6
KC1.3
01/09/08
48.7
KC1.3
01/09/08
53.1
KC1.3
01/09/08
58.1
KC1.3
01/09/08
65.1
KC1.3
01/09/08
69
KC1.3
01/09/08
73.9
KC1.3
01/09/08
77
KC1.3
01/09/08
80.8
KC1.3
01/09/08
82
KC1.3
01/09/08
83.8
KC1.3
01/09/08
82.4
KC1.3
01/09/08
80.5
KC1.3
01/09/08
73.4
KC1.3
01/09/08
67.9
KC1.3
01/09/08
63.2
KC1.3
01/09/08
58
KC1.3
01/09/08
53.7
KC1.3
01/09/08
51.5
KC1.3
01/09/08
49.7
KC1.3
01/09/08
45.8
KC1.3
01/09/08
46.5
KC1.3
01/09/08
47.3
KC1.3
01/09/08
43.6
KC1.3
01/09/08
43
KC1.3
01/09/08
42.5
KC1.3
01/09/08
42.3
KC1.3
01/09/08
41.5
KC1.3
01/09/08
41.9
F-151

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/09/08
43.3
KC1.3
01/09/08
40.8
KC1.3
01/09/08
41.8
KC1.3
01/09/08
43.8
KC1.3
01/09/08
42.4
KC1.3
01/09/08
42.6
KC1.3
01/09/08
43.9
KC1.3
01/09/08
42.1
KC1.3
01/09/08
41.3
KC1.3
01/09/08
42.6
KC1.3
01/09/08
40.7
KC1.3
01/09/08
40.6
KC1.3
01/09/08
42
KC1.3
01/09/08
40.3
KC1.3
01/09/08
40
KC1.3
01/09/08
41.5
KC1.3
01/09/08
39.6
KC1.3
01/09/08
39.9
KC1.3
01/09/08
43.2
KC1.3
01/09/08
47
KC1.3
01/09/08
58.9
KC1.3
01/09/08
71.2
KC1.3
01/09/08
84
KC1.3
01/10/08
103.8
KC1.3
01/10/08
103.5
KC1.3
01/10/08
62.4
KC1.3
01/10/08
61
KC1.3
01/10/08
71.3
KC1.3
01/10/08
78.3
KC1.3
01/10/08
85.5
KC1.3
01/10/08
85.9
KC1.3
01/10/08
84.4
KC1.3
01/10/08
79.4
KC1.3
01/10/08
76.2
KC1.3
01/10/08
71.6
KC1.3
01/10/08
69.3
KC1.3
01/10/08
68
KC1.3
01/10/08
65.2
KC1.3
01/10/08
65.8
KC1.3
01/10/08
66.4
KC1.3
01/10/08
65.2
KC1.3
01/10/08
64.4
KC1.3
01/10/08
64.4
KC1.3
01/10/08
61.2
KC1.3
01/10/08
59.9
F-152

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/10/08
59.3
KC1.3
01/10/08
57.5
KC1.3
01/10/08
58.9
KC1.3
01/10/08
55.9
KC1.3
01/10/08
54.7
KC1.3
01/10/08
55.1
KC1.3
01/10/08
53.2
KC1.3
01/10/08
54.8
KC1.3
01/10/08
57
KC1.3
01/10/08
56.6
KC1.3
01/10/08
58
KC1.3
01/10/08
59.3
KC1.3
01/10/08
58.3
KC1.3
01/10/08
58
KC1.3
01/10/08
57.6
KC1.3
01/10/08
58.7
KC1.3
01/10/08
56.8
KC1.3
01/10/08
58.1
KC1.3
01/10/08
59.8
KC1.3
01/10/08
60.7
KC1.3
01/10/08
38.7
KC1.3
01/10/08
28.1
KC1.3
01/10/08
37.5
KC1.3
01/10/08
44
KC1.3
01/10/08
48.6
KC1.3
01/10/08
53.4
KC1.3
01/10/08
53.7
KC1.3
01/10/08
54.6
KC1.3
01/10/08
56.1
KC1.3
01/10/08
55.1
KC1.3
01/10/08
56
KC1.3
01/10/08
57.3
KC1.3
01/10/08
57
KC1.3
01/10/08
57.6
KC1.3
01/10/08
60.6
KC1.3
01/10/08
62.2
KC1.3
01/10/08
63.9
KC1.3
01/10/08
60.4
KC1.3
01/10/08
63.6
KC1.3
01/10/08
66
KC1.3
01/10/08
67.2
KC1.3
01/10/08
72.2
KC1.3
01/10/08
74.4
KC1.3
01/10/08
71.5
KC1.3
01/10/08
72.9
F-153

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/10/08
72.7
KC1.3
01/10/08
68.4
KC1.3
01/10/08
67.8
KC1.3
01/10/08
67.2
KC1.3
01/10/08
65.2
KC1.3
01/10/08
64.6
KC1.3
01/11/08
62.7
KC1.3
01/11/08
45.1
KC1.3
01/11/08
36.4
KC1.3
01/11/08
45.9
KC1.3
01/11/08
53.3
KC1.3
01/11/08
59.7
KC1.3
01/11/08
57.5
KC1.3
01/11/08
58.7
KC1.3
01/11/08
57.5
KC1.3
01/11/08
59.1
KC1.3
01/11/08
55.5
KC1.3
01/11/08
55.4
KC1.3
01/11/08
57.3
KC1.3
01/11/08
53
KC1.3
01/11/08
52.7
KC1.3
01/11/08
53.1
KC1.3
01/11/08
50.7
KC1.3
01/11/08
53.2
KC1.3
01/11/08
53.4
KC1.3
01/11/08
54.2
KC1.3
01/11/08
55.4
KC1.3
01/11/08
51.9
KC1.3
01/11/08
52.6
KC1.3
01/11/08
55.1
KC1.3
01/11/08
50.7
KC1.3
01/11/08
51.1
KC1.3
01/11/08
51.8
KC1.3
01/11/08
49.3
KC1.3
01/11/08
51.6
KC1.3
01/11/08
55.9
KC1.3
01/11/08
53.9
KC1.3
01/11/08
56.2
KC1.3
01/11/08
58
KC1.3
01/11/08
54.8
KC1.3
01/11/08
55.3
KC1.3
01/11/08
57.1
KC1.3
01/11/08
54.8
KC1.3
01/11/08
55.4
KC1.3
01/11/08
55.2
F-154

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/11/08
51.8
KC1.3
01/11/08
53.3
KC1.3
01/11/08
53.7
KC1.3
01/11/08
52.3
KC1.3
01/11/08
52.9
KC1.3
01/11/08
59.2
KC1.3
01/11/08
57.4
KC1.3
01/11/08
56.5
KC1.3
01/11/08
58.1
KC1.3
01/11/08
57
KC1.3
01/11/08
56
KC1.3
01/11/08
56.8
KC1.3
01/11/08
55.1
KC1.3
01/11/08
55.6
KC1.3
01/11/08
54.4
KC1.3
01/11/08
52.9
KC1.3
01/11/08
53.5
KC1.3
01/11/08
54.4
KC1.3
01/11/08
52.7
KC1.3
01/11/08
51.8
KC1.3
01/11/08
52.9
KC1.3
01/11/08
52.3
KC1.3
01/11/08
52.7
KC1.3
01/11/08
53.6
KC1.3
01/11/08
52.1
KC1.3
01/11/08
53.5
KC1.3
01/11/08
54.6
KC1.3
01/11/08
51.7
KC1.3
01/11/08
50.9
KC1.3
01/11/08
52.5
KC1.3
01/11/08
51.2
KC1.3
01/11/08
51.9
KC1.3
01/11/08
52.6
KC1.3
01/11/08
49.9
KC1.3
01/11/08
50.2
KC1.3
01/11/08
50.8
KC1.3
01/11/08
49.1
KC1.3
01/11/08
47.7
KC1.3
01/11/08
49.8
KC1.3
01/11/08
47.5
KC1.3
01/11/08
46.7
KC1.3
01/11/08
48.9
KC1.3
01/11/08
47.8
KC1.3
01/11/08
48
KC1.3
01/11/08
49.6
F-155

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/11/08
49.1
KC1.3
01/11/08
48.2
KC1.3
01/11/08
48.6
KC1.3
01/11/08
46.6
KC1.3
01/11/08
47
KC1.3
01/11/08
47.7
KC1.3
01/11/08
46
KC1.3
01/11/08
46.2
KC1.3
01/11/08
47.6
KC1.3
01/1 2/08
44.2
KC1.3
01/1 2/08
35.4
KC1.3
01/1 2/08
32.1
KC1.3
01/1 2/08
35.7
KC1.3
01/1 2/08
39
KC1.3
01/1 2/08
42.9
KC1.3
01/1 2/08
47.6
KC1.3
01/1 2/08
43.3
KC1.3
01/1 2/08
44.3
KC1.3
01/1 2/08
45.2
KC1.3
01/1 2/08
43.1
KC1.3
01/1 2/08
45.2
KC1.3
01/1 2/08
45.9
KC1.3
01/1 2/08
48.2
KC1.3
01/1 2/08
41.4
KC1.3
01/1 2/08
41.6
KC1.3
01/1 2/08
165.1
KC1.3
01/1 2/08
148.7
KC1.3
01/1 2/08
133.2
KC1.3
01/1 2/08
119.6
KC1.3
01/12/08
115
KC1.3
01/1 2/08
101.7
KC1.3
01/1 2/08
82.3
KC1.3
01/1 2/08
73.3
KC1.3
01/1 2/08
65.2
KC1.3
01/1 2/08
63
KC1.3
01/1 2/08
66
KC1.3
01/1 2/08
50.9
KC1.3
01/1 2/08
38.8
KC1.3
01/1 2/08
47.8
KC1.3
01/12/08
101
KC1.3
01/1 2/08
105.2
KC1.3
01/1 2/08
119.6
KC1.3
01/1 2/08
125.9
KC1.3
01/1 2/08
131.8
KC1.3
01/1 2/08
138.2
F-156

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/1 2/08
134.5
KC1.3
01/1 2/08
133.6
KC1.3
01/1 2/08
135.8
KC1.3
01/1 2/08
129.7
KC1.3
01/1 2/08
97.1
KC1.3
01/1 2/08
64.4
KC1.3
01/1 2/08
97.5
KC1.3
01/1 2/08
137.2
KC1.3
01/1 2/08
213.9
KC1.3
01/1 2/08
208.2
KC1.3
01/1 2/08
153.4
KC1.3
01/1 2/08
98.5
KC1.3
01/1 2/08
97.1
KC1.3
01/1 2/08
95.3
KC1.3
01/1 2/08
95.6
KC1.3
01/1 2/08
CO
CO
CO
KC1.3
01/1 2/08
82.3
KC1.3
01/1 2/08
80.1
KC1.3
01/1 2/08
77.9
KC1.3
01/1 2/08
74.1
KC1.3
01/1 2/08
60.7
KC1.3
01/1 2/08
64.6
KC1.3
01/1 2/08
73.4
KC1.3
01/1 2/08
71.6
KC1.3
01/1 2/08
71.7
KC1.3
01/1 2/08
72.9
KC1.3
01/1 2/08
71.1
KC1.3
01/1 2/08
69.8
KC1.3
01/1 2/08
68
KC1.3
01/1 2/08
67.1
KC1.3
01/14/08
66.4
KC1.3
01/14/08
14.2
KC1.3
01/14/08
24.9
KC1.3
01/14/08
49.5
KC1.3
01/14/08
49.4
KC1.3
01/14/08
39.7
KC1.3
01/14/08
41.8
KC1.3
01/14/08
49.9
KC1.3
01/14/08
43.4
KC1.3
01/14/08
37.2
KC1.3
01/14/08
44.8
KC1.3
01/14/08
47.8
KC1.3
01/14/08
43.9
KC1.3
01/14/08
41.3
KC1.3
01/14/08
40.2
F-157

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.3
01/14/08
36.6
KC1.3
01/14/08
35.6
KC1.3
01/14/08
39
KC1.3
01/14/08
42.9
KC1.3
01/14/08
42.9
KC1.3
01/14/08
45.6
KC1.4
01/28/08
114.3
KC1.4
01/28/08
29.8
KC1.4
01/28/08
37.9
KC1.4
01/28/08
37.5
KC1.4
01/28/08
44.7
KC1.4
01/28/08
50.7
KC1.4
01/28/08
57.2
KC1.4
01/28/08
59.3
KC1.4
01/28/08
51.4
KC1.4
01/28/08
51.2
KC1.4
01/28/08
52.2
KC1.4
01/28/08
51.8
KC1.4
01/28/08
53
KC1.4
01/28/08
48.6
KC1.4
01/28/08
48.3
KC1.4
01/29/08
50.5
KC1.4
01/29/08
48
KC1.4
01/29/08
42.8
KC1.4
01/29/08
29.6
KC1.4
01/29/08
32.6
KC1.4
01/29/08
34
KC1.4
01/29/08
41.8
KC1.4
01/29/08
42.4
KC1.4
01/29/08
44.5
KC1.4
01/29/08
48.2
KC1.4
01/29/08
46.2
KC1.4
01/29/08
45.2
KC1.4
01/29/08
48.5
KC1.4
01/29/08
45.3
KC1.4
01/29/08
41.9
KC1.4
01/29/08
41.1
KC1.4
01/29/08
37.2
KC1.4
01/29/08
40.1
KC1.4
01/29/08
42.5
KC1.4
01/29/08
48
KC1.4
01/29/08
46
KC1.4
01/29/08
45.8
KC1.4
01/29/08
45.2
KC1.4
01/29/08
37.3
F-158

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.4
01/29/08
32
KC1.4
01/29/08
29.4
KC1.4
01/29/08
33.6
KC1.4
01/29/08
37.1
KC1.4
01/29/08
39.7
KC1.4
01/29/08
42.7
KC1.4
01/29/08
47.7
KC1.4
01/29/08
45.4
KC1.4
01/29/08
46.5
KC1.4
01/29/08
46.9
KC1.4
01/29/08
47.1
KC1.4
01/29/08
47
KC1.4
01/29/08
45.5
KC1.4
01/29/08
41
KC1.4
01/29/08
37.6
KC1.4
01/29/08
40.2
KC1.4
01/29/08
43
KC1.4
01/29/08
45.7
KC1.4
01/29/08
46.9
KC1.4
01/29/08
47.3
KC1.4
01/29/08
47.2
KC1.4
01/29/08
46.8
KC1.4
01/29/08
46.5
KC1.4
01/29/08
46.3
KC1.4
01/29/08
46.4
KC1.4
01/29/08
46
KC1.4
01/29/08
45.2
KC1.4
01/29/08
43
KC1.4
01/29/08
38.9
KC1.4
01/29/08
36.5
KC1.4
01/29/08
42.7
KC1.4
01/29/08
47.9
KC1.4
01/29/08
47
KC1.4
01/29/08
46.4
KC1.4
01/29/08
46
KC1.4
01/29/08
46.4
KC1.4
01/29/08
49.9
KC1.4
01/29/08
50.9
KC1.4
01/29/08
48.7
KC1.4
01/30/08
19.4
KC1.4
01/30/08
17.3
KC1.4
01/30/08
22.1
KC1.4
01/30/08
24.3
KC1.4
01/30/08
26
KC1.4
01/30/08
27.4
F-159

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.4
01/30/08
28.1
KC1.4
01/30/08
28.8
KC1.4
01/30/08
28.7
KC1.4
01/30/08
28.5
KC1.4
01/30/08
27.8
KC1.4
01/30/08
27.9
KC1.4
01/30/08
28.6
KC1.4
01/30/08
29
KC1.4
01/30/08
28.8
KC1.4
01/30/08
28.8
KC1.4
01/30/08
28.6
KC1.4
01/30/08
28.6
KC1.4
01/30/08
28.3
KC1.4
01/30/08
69.5
KC1.4
01/30/08
25.3
KC1.4
01/30/08
24.3
KC1.4
01/30/08
21.5
KC1.4
01/30/08
25.1
KC1.4
01/30/08
28.3
KC1.4
01/30/08
32.5
KC1.4
01/30/08
37.7
KC1.4
01/30/08
43.1
KC1.4
01/30/08
47.4
KC1.4
01/30/08
49.3
KC1.4
01/30/08
50.9
KC1.4
01/30/08
51.1
KC1.4
01/30/08
51.4
KC1.4
01/30/08
49.7
KC1.4
01/30/08
48.8
KC1.4
01/30/08
47.7
KC1.4
01/30/08
48.3
KC1.4
01/30/08
44.6
KC1.4
01/30/08
45.1
KC1.4
01/30/08
47.5
KC1.4
01/30/08
49.3
KC1.4
01/30/08
54.5
KC1.4
01/30/08
52.6
KC1.4
01/30/08
55.2
KC1.4
01/30/08
59.5
KC1.4
01/30/08
58.5
KC1.4
01/30/08
56.5
KC1.4
01/30/08
56.2
KC1.4
01/30/08
54.4
KC1.5
01/02/08
94.8
KC1.5
01/02/08
5.2
F-160

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/02/08
14
KC1.5
01/02/08
23.3
KC1.5
01/02/08
35.1
KC1.5
01/02/08
37.7
KC1.5
01/02/08
40.7
KC1.5
01/02/08
43.7
KC1.5
01/02/08
51.6
KC1.5
01/02/08
47
KC1.5
01/02/08
40.3
KC1.5
01/02/08
36.5
KC1.5
01/02/08
36.8
KC1.5
01/02/08
40
KC1.5
01/02/08
39
KC1.5
01/02/08
40
KC1.5
01/02/08
44.5
KC1.5
01/02/08
46.1
KC1.5
01/02/08
45.1
KC1.5
01/02/08
40.7
KC1.5
01/02/08
36.5
KC1.5
01/02/08
35
KC1.5
01/02/08
37.7
KC1.5
01/02/08
39.5
KC1.5
01/02/08
40.4
KC1.5
01/02/08
43.3
KC1.5
01/02/08
45.3
KC1.5
01/02/08
40.3
KC1.5
01/02/08
34.4
KC1.5
01/02/08
33.9
KC1.5
01/02/08
31.6
KC1.5
01/02/08
33.8
KC1.5
01/02/08
35.4
KC1.5
01/02/08
35.4
KC1.5
01/02/08
38.2
KC1.5
01/02/08
43.3
KC1.5
01/02/08
41.9
KC1.5
01/02/08
34.2
KC1.5
01/02/08
33.8
KC1.5
01/02/08
36.3
KC1.5
01/02/08
36.5
KC1.5
01/02/08
38.5
KC1.5
01/02/08
39.9
KC1.5
01/02/08
40.1
KC1.5
01/02/08
41.3
KC1.5
01/02/08
49
KC1.5
01/02/08
50.6
F-161

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/02/08
43.5
KC1.5
01/02/08
39.1
KC1.5
01/02/08
32.7
KC1.5
01/02/08
32.9
KC1.5
01/02/08
33.5
KC1.5
01/02/08
34.9
KC1.5
01/02/08
34.6
KC1.5
01/02/08
37
KC1.5
01/02/08
36.8
KC1.5
01/02/08
38.9
KC1.5
01/02/08
37.2
KC1.5
01/02/08
40.8
KC1.5
01/03/08
40.9
KC1.5
01/03/08
41.7
KC1.5
01/03/08
35.5
KC1.5
01/03/08
38.4
KC1.5
01/03/08
41.5
KC1.5
01/03/08
36.2
KC1.5
01/03/08
34.8
KC1.5
01/03/08
32.8
KC1.5
01/03/08
35.6
KC1.5
01/03/08
35.9
KC1.5
01/03/08
42.5
KC1.5
01/03/08
42.1
KC1.5
01/03/08
42.3
KC1.5
01/03/08
37.1
KC1.5
01/03/08
36.4
KC1.5
01/03/08
37
KC1.5
01/03/08
34.7
KC1.5
01/03/08
39.9
KC1.5
01/03/08
40.9
KC1.5
01/03/08
42.8
KC1.5
01/03/08
43.7
KC1.5
01/03/08
39.4
KC1.5
01/03/08
38.7
KC1.5
01/03/08
34.4
KC1.5
01/03/08
35.7
KC1.5
01/03/08
36.1
KC1.5
01/03/08
37
KC1.5
01/03/08
39.5
KC1.5
01/03/08
41.3
KC1.5
01/03/08
45.8
KC1.5
01/03/08
40.7
KC1.5
01/03/08
40.1
KC1.5
01/03/08
38
F-162

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/03/08
36.8
KC1.5
01/03/08
41.5
KC1.5
01/03/08
44.5
KC1.5
01/03/08
52.4
KC1.5
01/03/08
46.3
KC1.5
01/03/08
41.4
KC1.5
01/03/08
42.6
KC1.5
01/03/08
42.4
KC1.5
01/03/08
47.4
KC1.5
01/03/08
43
KC1.5
01/03/08
48.4
KC1.5
01/03/08
43.9
KC1.5
01/03/08
45.4
KC1.5
01/03/08
49.9
KC1.5
01/03/08
48.3
KC1.5
01/03/08
51.4
KC1.5
01/05/08
144
KC1.5
01/05/08
20.9
KC1.5
01/05/08
14
KC1.5
01/05/08
29.4
KC1.5
01/05/08
36.4
KC1.5
01/05/08
34.1
KC1.5
01/05/08
31.1
KC1.5
01/05/08
31.4
KC1.5
01/05/08
32.1
KC1.5
01/05/08
34.1
KC1.5
01/05/08
36.4
KC1.5
01/05/08
36.2
KC1.5
01/05/08
39.1
KC1.5
01/05/08
40.3
KC1.5
01/05/08
40
KC1.5
01/05/08
35.8
KC1.5
01/05/08
34.1
KC1.5
01/05/08
34.1
KC1.5
01/05/08
35.7
KC1.5
01/05/08
35.8
KC1.5
01/05/08
37.6
KC1.5
01/05/08
36.3
KC1.5
01/05/08
38.6
KC1.5
01/05/08
38.3
KC1.5
01/05/08
40.5
KC1.5
01/05/08
36.2
KC1.5
01/05/08
35.3
KC1.5
01/05/08
32.6
KC1.5
01/05/08
34
F-163

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/05/08
33.7
KC1.5
01/05/08
36.2
KC1.5
01/05/08
34
KC1.5
01/05/08
38.3
KC1.5
01/05/08
38.8
KC1.5
01/05/08
42.7
KC1.5
01/05/08
37.1
KC1.5
01/05/08
35.8
KC1.5
01/05/08
32.9
KC1.5
01/05/08
35
KC1.5
01/05/08
32.4
KC1.5
01/05/08
34.6
KC1.5
01/05/08
33.1
KC1.5
01/05/08
35.5
KC1.5
01/05/08
34
KC1.5
01/05/08
39.4
KC1.5
01/05/08
37.5
KC1.5
01/05/08
36.3
KC1.5
01/05/08
30.4
KC1.5
01/05/08
31.1
KC1.5
01/05/08
29.1
KC1.5
01/05/08
33.7
KC1.5
01/05/08
34.4
KC1.5
01/05/08
36.1
KC1.5
01/05/08
33.9
KC1.5
01/05/08
35.4
KC1.5
01/05/08
33.1
KC1.5
01/05/08
33.8
KC1.5
01/05/08
33.4
KC1.5
01/05/08
33.9
KC1.5
01/05/08
31.9
KC1.5
01/05/08
33.3
KC1.5
01/05/08
30.8
KC1.5
01/06/08
32.8
KC1.5
01/08/08
28.9
KC1.5
01/08/08
6.6
KC1.5
01/08/08
8.4
KC1.5
01/08/08
16.8
KC1.5
01/08/08
21.8
KC1.5
01/08/08
22.8
KC1.5
01/08/08
26.2
KC1.5
01/08/08
26.2
KC1.5
01/08/08
29.3
KC1.5
01/08/08
29.9
KC1.5
01/08/08
32.9
F-164

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/08/08
32.7
KC1.5
01/08/08
36.2
KC1.5
01/08/08
33.8
KC1.5
01/08/08
32.4
KC1.5
01/08/08
28.1
KC1.5
01/08/08
29.4
KC1.5
01/08/08
28
KC1.5
01/08/08
30.4
KC1.5
01/08/08
29.6
KC1.5
01/08/08
32.5
KC1.5
01/08/08
32.7
KC1.5
01/08/08
33.9
KC1.5
01/08/08
36.9
KC1.5
01/08/08
38.7
KC1.5
01/08/08
45.3
KC1.5
01/08/08
52.2
KC1.5
01/08/08
40.1
KC1.5
01/08/08
43.2
KC1.5
01/08/08
44.3
KC1.5
01/08/08
49
KC1.5
01/08/08
52.1
KC1.5
01/08/08
46.1
KC1.5
01/08/08
44
KC1.5
01/08/08
47.9
KC1.5
01/08/08
50
KC1.5
01/08/08
50.9
KC1.5
01/08/08
45.7
KC1.5
01/08/08
43.2
KC1.5
01/08/08
46.3
KC1.5
01/08/08
50.7
KC1.5
01/08/08
58.3
KC1.5
01/08/08
39.8
KC1.5
01/08/08
40.9
KC1.5
01/08/08
38.6
KC1.5
01/08/08
40.8
KC1.5
01/08/08
45.6
KC1.5
01/08/08
38.9
KC1.5
01/08/08
40.3
KC1.5
01/08/08
37.5
KC1.5
01/08/08
39.3
KC1.5
01/08/08
38.6
KC1.5
01/09/08
16
KC1.5
01/09/08
28.6
KC1.5
01/09/08
27.9
KC1.5
01/09/08
30.6
F-165

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/09/08
31.7
KC1.5
01/09/08
35.1
KC1.5
01/09/08
37.3
KC1.5
01/09/08
35
KC1.5
01/09/08
33
KC1.5
01/09/08
33.4
KC1.5
01/09/08
34.6
KC1.5
01/09/08
34.6
KC1.5
01/09/08
37.7
KC1.5
01/09/08
36.6
KC1.5
01/09/08
36.4
KC1.5
01/09/08
34.9
KC1.5
01/09/08
36.4
KC1.5
01/09/08
36
KC1.5
01/09/08
63.6
KC1.5
01/09/08
70.4
KC1.5
01/09/08
71.1
KC1.5
01/09/08
69.9
KC1.5
01/09/08
66.5
KC1.5
01/09/08
61.1
KC1.5
01/09/08
56.7
KC1.5
01/09/08
50.6
KC1.5
01/09/08
47.4
KC1.5
01/09/08
43.5
KC1.5
01/09/08
42.9
KC1.5
01/09/08
45
KC1.5
01/09/08
36.6
KC1.5
01/09/08
37.7
KC1.5
01/09/08
35.4
KC1.5
01/09/08
36.5
KC1.5
01/09/08
34.4
KC1.5
01/09/08
34.5
KC1.5
01/09/08
32.4
KC1.5
01/09/08
34.5
KC1.5
01/09/08
32.6
KC1.5
01/09/08
34.1
KC1.5
01/09/08
33.7
KC1.5
01/09/08
34
KC1.5
01/09/08
34.7
KC1.5
01/09/08
33.4
KC1.5
01/09/08
35.2
KC1.5
01/09/08
32.5
KC1.5
01/09/08
34
KC1.5
01/09/08
31.5
KC1.5
01/09/08
32.7
F-166

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/09/08
31.8
KC1.5
01/09/08
31.3
KC1.5
01/09/08
32.7
KC1.5
01/09/08
30.7
KC1.5
01/09/08
32.1
KC1.5
01/09/08
31.9
KC1.5
01/09/08
31.3
KC1.5
01/09/08
32.8
KC1.5
01/09/08
33.5
KC1.5
01/09/08
40.6
KC1.5
01/09/08
46.1
KC1.5
01/09/08
52.1
KC1.5
01/10/08
65.7
KC1.5
01/10/08
70.3
KC1.5
01/10/08
54.4
KC1.5
01/10/08
54.9
KC1.5
01/10/08
57.8
KC1.5
01/10/08
62.7
KC1.5
01/10/08
65.8
KC1.5
01/10/08
70.6
KC1.5
01/10/08
68.9
KC1.5
01/10/08
64.6
KC1.5
01/10/08
58
KC1.5
01/10/08
55.6
KC1.5
01/10/08
53.3
KC1.5
01/10/08
53.7
KC1.5
01/10/08
50.3
KC1.5
01/10/08
50
KC1.5
01/10/08
48.3
KC1.5
01/10/08
49.4
KC1.5
01/10/08
47.8
KC1.5
01/10/08
45.1
KC1.5
01/10/08
45.9
KC1.5
01/10/08
44.4
KC1.5
01/10/08
42.6
KC1.5
01/10/08
43
KC1.5
01/10/08
41.4
KC1.5
01/10/08
42
KC1.5
01/10/08
41.1
KC1.5
01/10/08
40.7
KC1.5
01/10/08
40.9
KC1.5
01/10/08
40.6
KC1.5
01/10/08
41.9
KC1.5
01/10/08
40.7
KC1.5
01/10/08
43.9
F-167

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/10/08
43.4
KC1.5
01/10/08
45.1
KC1.5
01/10/08
44.4
KC1.5
01/10/08
45.5
KC1.5
01/10/08
42.3
KC1.5
01/10/08
44.1
KC1.5
01/10/08
44.3
KC1.5
01/10/08
44.7
KC1.5
01/10/08
44.5
KC1.5
01/10/08
29
KC1.5
01/10/08
29.1
KC1.5
01/10/08
26.8
KC1.5
01/10/08
31.2
KC1.5
01/10/08
36.1
KC1.5
01/10/08
37.9
KC1.5
01/10/08
40.5
KC1.5
01/10/08
40.5
KC1.5
01/10/08
41.9
KC1.5
01/10/08
39.9
KC1.5
01/10/08
41.1
KC1.5
01/10/08
41.9
KC1.5
01/10/08
41.1
KC1.5
01/10/08
43.7
KC1.5
01/10/08
43.4
KC1.5
01/10/08
44.7
KC1.5
01/10/08
46.6
KC1.5
01/10/08
47.4
KC1.5
01/10/08
48.4
KC1.5
01/10/08
48.1
KC1.5
01/10/08
47.6
KC1.5
01/10/08
56.2
KC1.5
01/10/08
55
KC1.5
01/10/08
60.2
KC1.5
01/10/08
57.8
KC1.5
01/10/08
58.7
KC1.5
01/10/08
55.9
KC1.5
01/10/08
55.2
KC1.5
01/10/08
54
KC1.5
01/10/08
54
KC1.5
01/10/08
53.7
KC1.5
01/11/08
51.6
KC1.5
01/11/08
46.3
KC1.5
01/11/08
35.7
KC1.5
01/11/08
36.4
KC1.5
01/11/08
43
F-168

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/11/08
47.6
KC1.5
01/11/08
47.5
KC1.5
01/11/08
48
KC1.5
01/11/08
47.3
KC1.5
01/11/08
46.3
KC1.5
01/11/08
46.9
KC1.5
01/11/08
45.7
KC1.5
01/11/08
43.8
KC1.5
01/11/08
44.8
KC1.5
01/11/08
42.9
KC1.5
01/11/08
42.1
KC1.5
01/11/08
42.7
KC1.5
01/11/08
43.3
KC1.5
01/11/08
42.5
KC1.5
01/11/08
43.5
KC1.5
01/11/08
42.7
KC1.5
01/11/08
43.3
KC1.5
01/11/08
43.9
KC1.5
01/11/08
43.7
KC1.5
01/11/08
42.5
KC1.5
01/11/08
44.9
KC1.5
01/11/08
43.3
KC1.5
01/11/08
44.2
KC1.5
01/11/08
44
KC1.5
01/11/08
44.7
KC1.5
01/11/08
48.4
KC1.5
01/11/08
46.9
KC1.5
01/11/08
47.9
KC1.5
01/11/08
47.5
KC1.5
01/11/08
45.6
KC1.5
01/11/08
46.5
KC1.5
01/11/08
46.6
KC1.5
01/11/08
46.3
KC1.5
01/11/08
46.2
KC1.5
01/11/08
45.4
KC1.5
01/11/08
45.4
KC1.5
01/11/08
45.7
KC1.5
01/11/08
44.1
KC1.5
01/11/08
46
KC1.5
01/11/08
47.6
KC1.5
01/11/08
45.6
KC1.5
01/11/08
49.2
KC1.5
01/11/08
49.5
KC1.5
01/11/08
48.1
KC1.5
01/11/08
46.9
F-169

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/11/08
47.7
KC1.5
01/11/08
46.5
KC1.5
01/11/08
46.5
KC1.5
01/11/08
48.1
KC1.5
01/11/08
45.9
KC1.5
01/11/08
46.3
KC1.5
01/11/08
45.8
KC1.5
01/11/08
45.5
KC1.5
01/11/08
44.9
KC1.5
01/11/08
43.6
KC1.5
01/11/08
43.8
KC1.5
01/11/08
43.8
KC1.5
01/11/08
43
KC1.5
01/11/08
44.9
KC1.5
01/11/08
44.7
KC1.5
01/11/08
45.3
KC1.5
01/11/08
45.4
KC1.5
01/11/08
44.5
KC1.5
01/11/08
44.9
KC1.5
01/11/08
44.8
KC1.5
01/11/08
43.8
KC1.5
01/11/08
45.3
KC1.5
01/11/08
43
KC1.5
01/11/08
43.3
KC1.5
01/11/08
42.2
KC1.5
01/11/08
43.8
KC1.5
01/11/08
41.3
KC1.5
01/11/08
41.9
KC1.5
01/11/08
41.6
KC1.5
01/11/08
40.4
KC1.5
01/11/08
40.6
KC1.5
01/11/08
42.2
KC1.5
01/11/08
41.5
KC1.5
01/11/08
40
KC1.5
01/11/08
41.6
KC1.5
01/11/08
40.7
KC1.5
01/11/08
41.1
KC1.5
01/11/08
40.1
KC1.5
01/11/08
39.6
KC1.5
01/11/08
40.6
KC1.5
01/11/08
39
KC1.5
01/11/08
39.2
KC1.5
01/11/08
39.3
KC1.5
01/1 2/08
39.1
KC1.5
01/1 2/08
38.4
F-170

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/1 2/08
39.6
KC1.5
01/1 2/08
28.2
KC1.5
01/1 2/08
30
KC1.5
01/1 2/08
31.8
KC1.5
01/1 2/08
36
KC1.5
01/1 2/08
37.5
KC1.5
01/1 2/08
37.6
KC1.5
01/1 2/08
37.3
KC1.5
01/1 2/08
36.2
KC1.5
01/1 2/08
38.1
KC1.5
01/1 2/08
38.8
KC1.5
01/1 2/08
38.7
KC1.5
01/1 2/08
39.3
KC1.5
01/1 2/08
39
KC1.5
01/1 2/08
35.8
KC1.5
01/12/08
193
KC1.5
01/1 2/08
175.9
KC1.5
01/1 2/08
142.7
KC1.5
01/1 2/08
135.4
KC1.5
01/1 2/08
122.4
KC1.5
01/1 2/08
99.1
KC1.5
01/1 2/08
82.6
KC1.5
01/1 2/08
67.5
KC1.5
01/1 2/08
62.6
KC1.5
01/1 2/08
56.8
KC1.5
01/1 2/08
48.6
KC1.5
01/1 2/08
45.3
KC1.5
01/1 2/08
35.3
KC1.5
01/1 2/08
41
KC1.5
01/12/08
103.5
KC1.5
01/12/08
103.8
KC1.5
01/12/08
114.8
KC1.5
01/12/08
129
KC1.5
01/1 2/08
131.2
KC1.5
01/1 2/08
132.2
KC1.5
01/1 2/08
125.6
KC1.5
01/1 2/08
114.7
KC1.5
01/1 2/08
103.9
KC1.5
01/1 2/08
98.9
KC1.5
01/1 2/08
74.3
KC1.5
01/1 2/08
61
KC1.5
01/12/08
101
KC1.5
01/12/08
140
KC1.5
01/1 2/08
167.8
KC1.5
01/12/08
118
F-171

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/1 2/08
75.3
KC1.5
01/1 2/08
67.7
KC1.5
01/1 2/08
77.8
KC1.5
01/1 2/08
85.1
KC1.5
01/1 2/08
78.9
KC1.5
01/1 2/08
72.1
KC1.5
01/1 2/08
63.6
KC1.5
01/1 2/08
63.7
KC1.5
01/1 2/08
64.3
KC1.5
01/1 2/08
59.3
KC1.5
01/1 2/08
50.5
KC1.5
01/1 2/08
63.1
KC1.5
01/1 2/08
71.7
KC1.5
01/1 2/08
68.5
KC1.5
01/1 2/08
68.8
KC1.5
01/1 2/08
70.6
KC1.5
01/1 2/08
66.4
KC1.5
01/1 2/08
65.5
KC1.5
01/1 2/08
64.3
KC1.5
01/1 2/08
59.4
KC1.5
01/1 2/08
53.8
KC1.5
01/14/08
91
KC1.5
01/14/08
11.9
KC1.5
01/14/08
17.3
KC1.5
01/14/08
22.3
KC1.5
01/14/08
30.7
KC1.5
01/14/08
33.5
KC1.5
01/14/08
29.9
KC1.5
01/14/08
32.6
KC1.5
01/14/08
34.4
KC1.5
01/14/08
33.3
KC1.5
01/14/08
32.8
KC1.5
01/14/08
36.7
KC1.5
01/14/08
33.5
KC1.5
01/14/08
33.4
KC1.5
01/14/08
31.6
KC1.5
01/14/08
30.7
KC1.5
01/14/08
29.7
KC1.5
01/14/08
29
KC1.5
01/14/08
33.4
KC1.5
01/14/08
32.5
KC1.5
01/14/08
35.6
KC1.5
01/14/08
35.6
KC1.5
01/14/08
41.2
KC1.5
01/14/08
48.1
F-172

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/14/08
56.7
KC1.5
01/14/08
62.7
KC1.5
01/14/08
69.8
KC1.5
01/14/08
75.9
KC1.5
01/14/08
78.3
KC1.5
01/14/08
76.5
KC1.5
01/14/08
74.9
KC1.5
01/14/08
69.2
KC1.5
01/14/08
63.6
KC1.5
01/14/08
60.3
KC1.5
01/14/08
55.3
KC1.5
01/14/08
50.1
KC1.5
01/14/08
48.9
KC1.5
01/14/08
46.1
KC1.5
01/14/08
42.4
KC1.5
01/14/08
39.3
KC1.5
01/14/08
36.2
KC1.5
01/14/08
33.5
KC1.5
01/14/08
29.4
KC1.5
01/14/08
32.8
KC1.5
01/14/08
43.2
KC1.5
01/14/08
47.1
KC1.5
01/14/08
45.4
KC1.5
01/14/08
42.8
KC1.5
01/14/08
39.7
KC1.5
01/14/08
40.6
KC1.5
01/14/08
39.8
KC1.5
01/14/08
40
KC1.5
01/14/08
39.8
KC1.5
01/14/08
38.5
KC1.5
01/14/08
39.7
KC1.5
01/14/08
39.8
KC1.5
01/14/08
36.8
KC1.5
01/14/08
35
KC1.5
01/14/08
44.3
KC1.5
01/14/08
52.3
KC1.5
01/14/08
65.9
KC1.5
01/14/08
43.8
KC1.5
01/14/08
36.1
KC1.5
01/14/08
36.5
KC1.5
01/15/08
34.9
KC1.5
01/15/08
36.1
KC1.5
01/15/08
25
KC1.5
01/15/08
29.9
KC1.5
01/15/08
27.2
F-173

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/15/08
29.9
KC1.5
01/15/08
32
KC1.5
01/15/08
36.2
KC1.5
01/15/08
37.9
KC1.5
01/15/08
37.1
KC1.5
01/15/08
40.5
KC1.5
01/15/08
47.2
KC1.5
01/15/08
46.8
KC1.5
01/15/08
40.8
KC1.5
01/15/08
38
KC1.5
01/15/08
37.7
KC1.5
01/15/08
37.2
KC1.5
01/15/08
36.8
KC1.5
01/15/08
35.8
KC1.5
01/15/08
33.1
KC1.5
01/15/08
33
KC1.5
01/15/08
33
KC1.5
01/15/08
35.9
KC1.5
01/15/08
35.4
KC1.5
01/15/08
33.2
KC1.5
01/15/08
32.8
KC1.5
01/15/08
35.4
KC1.5
01/15/08
38
KC1.5
01/15/08
35.5
KC1.5
01/15/08
36.2
KC1.5
01/15/08
38.6
KC1.5
01/15/08
35.3
KC1.5
01/15/08
36
KC1.5
01/15/08
36.1
KC1.5
01/15/08
33.3
KC1.5
01/15/08
31.5
KC1.5
01/15/08
31.9
KC1.5
01/15/08
36.1
KC1.5
01/15/08
35.3
KC1.5
01/15/08
34.8
KC1.5
01/15/08
36
KC1.5
01/15/08
34.6
KC1.5
01/15/08
35.3
KC1.5
01/15/08
31.6
KC1.5
01/15/08
30.4
KC1.5
01/15/08
31.9
KC1.5
01/15/08
30.2
KC1.5
01/15/08
31.2
KC1.5
01/15/08
34.6
KC1.5
01/15/08
32.1
F-174

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/15/08
32.6
KC1.5
01/15/08
32.2
KC1.5
01/15/08
28.9
KC1.5
01/15/08
30
KC1.5
01/15/08
31.2
KC1.5
01/15/08
31
KC1.5
01/15/08
32.7
KC1.5
01/15/08
28.6
KC1.5
01/15/08
27
KC1.5
01/15/08
27.1
KC1.5
01/15/08
23.2
KC1.5
01/24/08
62.9
KC1.5
01/24/08
12.1
KC1.5
01/24/08
15.4
KC1.5
01/24/08
18.4
KC1.5
01/24/08
20.7
KC1.5
01/24/08
23.5
KC1.5
01/24/08
26
KC1.5
01/24/08
27.4
KC1.5
01/24/08
29
KC1.5
01/24/08
31.3
KC1.5
01/24/08
34.4
KC1.5
01/24/08
36.8
KC1.5
01/24/08
38.9
KC1.5
01/24/08
41
KC1.5
01/24/08
42.3
KC1.5
01/24/08
42.9
KC1.5
01/24/08
43.6
KC1.5
01/24/08
44.5
KC1.5
01/24/08
44.7
KC1.5
01/24/08
45.3
KC1.5
01/24/08
44.4
KC1.5
01/24/08
45
KC1.5
01/24/08
44.9
KC1.5
01/24/08
45.8
KC1.5
01/24/08
45
KC1.5
01/24/08
44.9
KC1.5
01/24/08
44.8
KC1.5
01/24/08
44.8
KC1.5
01/24/08
45
KC1.5
01/24/08
45.2
KC1.5
01/24/08
44.9
KC1.5
01/25/08
45.2
KC1.5
01/25/08
45.7
KC1.5
01/25/08
67.7
F-175

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/25/08
60.3
KC1.5
01/25/08
49.8
KC1.5
01/25/08
44.2
KC1.5
01/25/08
46
KC1.5
01/25/08
47.5
KC1.5
01/25/08
49.6
KC1.5
01/25/08
47.9
KC1.5
01/25/08
46.3
KC1.5
01/25/08
45.6
KC1.5
01/25/08
44.4
KC1.5
01/25/08
44.1
KC1.5
01/25/08
43.8
KC1.5
01/25/08
44
KC1.5
01/25/08
44.4
KC1.5
01/25/08
45.1
KC1.5
01/25/08
45.6
KC1.5
01/25/08
46.1
KC1.5
01/28/08
86.2
KC1.5
01/28/08
26.8
KC1.5
01/28/08
33.6
KC1.5
01/28/08
32.4
KC1.5
01/28/08
31.3
KC1.5
01/28/08
35.8
KC1.5
01/28/08
41.8
KC1.5
01/28/08
44.7
KC1.5
01/28/08
45.8
KC1.5
01/28/08
46.8
KC1.5
01/28/08
43.7
KC1.5
01/28/08
47.1
KC1.5
01/28/08
45
KC1.5
01/28/08
44.9
KC1.5
01/28/08
43.5
KC1.5
01/28/08
41.7
KC1.5
01/29/08
39.6
KC1.5
01/29/08
38.8
KC1.5
01/29/08
34
KC1.5
01/29/08
28.4
KC1.5
01/29/08
26.9
KC1.5
01/29/08
28.4
KC1.5
01/29/08
28.6
KC1.5
01/29/08
33.9
KC1.5
01/29/08
35.2
KC1.5
01/29/08
38.8
KC1.5
01/29/08
38.2
KC1.5
01/29/08
37.2
F-176

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/29/08
38.3
KC1.5
01/29/08
35.5
KC1.5
01/29/08
37
KC1.5
01/29/08
33.4
KC1.5
01/29/08
34
KC1.5
01/29/08
31.8
KC1.5
01/29/08
34.6
KC1.5
01/29/08
35
KC1.5
01/29/08
37.7
KC1.5
01/29/08
38.4
KC1.5
01/29/08
38.7
KC1.5
01/29/08
44.5
KC1.5
01/29/08
27.8
KC1.5
01/29/08
27.7
KC1.5
01/29/08
25.4
KC1.5
01/29/08
27.6
KC1.5
01/29/08
28.4
KC1.5
01/29/08
33.3
KC1.5
01/29/08
33.5
KC1.5
01/29/08
36.3
KC1.5
01/29/08
36.8
KC1.5
01/29/08
36.6
KC1.5
01/29/08
37
KC1.5
01/29/08
37.3
KC1.5
01/29/08
36.2
KC1.5
01/29/08
32.9
KC1.5
01/29/08
33
KC1.5
01/29/08
33.4
KC1.5
01/29/08
33.8
KC1.5
01/29/08
35.3
KC1.5
01/29/08
37.5
KC1.5
01/29/08
37.7
KC1.5
01/29/08
37.1
KC1.5
01/29/08
37.9
KC1.5
01/29/08
37.1
KC1.5
01/29/08
36.6
KC1.5
01/29/08
36.9
KC1.5
01/29/08
36.1
KC1.5
01/29/08
34.6
KC1.5
01/29/08
35.3
KC1.5
01/29/08
33.7
KC1.5
01/29/08
30.5
KC1.5
01/29/08
37.3
KC1.5
01/29/08
41.2
KC1.5
01/29/08
38.1
F-177

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/29/08
36.9
KC1.5
01/29/08
38.2
KC1.5
01/29/08
37.5
KC1.5
01/29/08
39.2
KC1.5
01/29/08
39.8
KC1.5
01/29/08
37.3
KC1.5
01/30/08
25.5
KC1.5
01/30/08
16.6
KC1.5
01/30/08
16.6
KC1.5
01/30/08
18.3
KC1.5
01/30/08
19.8
KC1.5
01/30/08
22.5
KC1.5
01/30/08
22.4
KC1.5
01/30/08
24.8
KC1.5
01/30/08
23.5
KC1.5
01/30/08
25.1
KC1.5
01/30/08
24.5
KC1.5
01/30/08
23.1
KC1.5
01/30/08
24.7
KC1.5
01/30/08
24.4
KC1.5
01/30/08
23.6
KC1.5
01/30/08
25.5
KC1.5
01/30/08
25.3
KC1.5
01/30/08
24.3
KC1.5
01/30/08
26.2
KC1.5
01/30/08
30.9
KC1.5
01/30/08
19.8
KC1.5
01/30/08
19.7
KC1.5
01/30/08
20.2
KC1.5
01/30/08
20.1
KC1.5
01/30/08
21.6
KC1.5
01/30/08
25.1
KC1.5
01/30/08
31
KC1.5
01/30/08
32.6
KC1.5
01/30/08
39.3
KC1.5
01/30/08
41.2
KC1.5
01/30/08
42.3
KC1.5
01/30/08
44.8
KC1.5
01/30/08
43.3
KC1.5
01/30/08
43.2
KC1.5
01/30/08
44.9
KC1.5
01/30/08
43.1
KC1.5
01/30/08
39.8
KC1.5
01/30/08
39.6
KC1.5
01/30/08
41.2
F-178

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC1.5
01/30/08
39.2
KC1.5
01/30/08
42.9
KC1.5
01/30/08
42
KC1.5
01/30/08
46
KC1.5
01/30/08
44.5
KC1.5
01/30/08
48.5
KC1.5
01/30/08
46.4
KC1.5
01/30/08
49
KC1.5
01/30/08
47.1
KC1.5
01/30/08
48.2
KC2.1
1 2/02/07
74.8
KC2.1
1 2/02/07
74.2
KC2.1
1 2/02/07
76.1
KC2.1
1 2/02/07
76.3
KC2.1
1 2/02/07
79.2
KC2.1
1 2/02/07
91.6
KC2.1
1 2/02/07
120.3
KC2.1
1 2/02/07
142.5
KC2.1
1 2/02/07
140.7
KC2.1
1 2/02/07
134.2
KC2.1
1 2/02/07
123
KC2.1
1 2/02/07
101.3
KC2.1
1 2/02/07
84.4
KC2.1
1 2/02/07
85.4
KC2.1
1 2/02/07
89.6
KC2.1
1 2/02/07
103
KC2.1
1 2/02/07
132.1
KC2.1
1 2/02/07
159.1
KC2.1
1 2/02/07
153.8
KC2.1
1 2/02/07
147.3
KC2.1
1 2/02/07
107.5
KC2.1
1 2/02/07
105.5
KC2.1
1 2/02/07
108
KC2.1
1 2/02/07
113
KC2.1
1 2/02/07
134.8
KC2.1
1 2/02/07
157.8
KC2.1
1 2/02/07
139.8
KC2.1
1 2/02/07
114
KC2.1
1 2/02/07
112.5
KC2.1
1 2/02/07
122.2
KC2.1
1 2/02/07
142.8
KC2.1
1 2/02/07
158.7
KC2.1
1 2/02/07
135.3
KC2.1
1 2/02/07
126.3
KC2.1
1 2/02/07
118.1
F-179

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/02/07
85.7
KC2.1
1 2/02/07
85.7
KC2.1
1 2/02/07
84.3
KC2.1
1 2/02/07
78.7
KC2.1
1 2/02/07
75.3
KC2.1
1 2/02/07
80.3
KC2.1
1 2/02/07
88.9
KC2.1
1 2/03/07
125.3
KC2.1
1 2/03/07
158.6
KC2.1
1 2/03/07
164.6
KC2.1
1 2/03/07
157.8
KC2.1
1 2/03/07
131.1
KC2.1
1 2/03/07
235.5
KC2.1
1 2/03/07
404.4
KC2.1
1 2/03/07
105.3
KC2.1
1 2/03/07
83.7
KC2.1
1 2/03/07
90.8
KC2.1
1 2/03/07
118.7
KC2.1
1 2/03/07
153.9
KC2.1
1 2/03/07
163.4
KC2.1
1 2/03/07
183.4
KC2.1
1 2/03/07
189.2
KC2.1
1 2/03/07
195.7
KC2.1
1 2/03/07
206.2
KC2.1
1 2/03/07
182.4
KC2.1
1 2/03/07
93.7
KC2.1
1 2/03/07
82.1
KC2.1
1 2/03/07
94.8
KC2.1
1 2/03/07
131.9
KC2.1
1 2/03/07
154.9
KC2.1
1 2/03/07
150.4
KC2.1
1 2/03/07
131
KC2.1
1 2/03/07
96.7
KC2.1
1 2/03/07
118.3
KC2.1
1 2/03/07
143
KC2.1
1 2/03/07
117
KC2.1
1 2/03/07
107.6
KC2.1
1 2/03/07
142.4
KC2.1
1 2/03/07
132
KC2.1
1 2/03/07
106.4
KC2.1
1 2/03/07
138.5
KC2.1
1 2/03/07
175.9
KC2.1
1 2/03/07
178.1
KC2.1
1 2/03/07
165.1
KC2.1
1 2/03/07
114
F-180

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/03/07
127.5
KC2.1
1 2/03/07
180.4
KC2.1
1 2/03/07
170.1
KC2.1
1 2/03/07
118.3
KC2.1
1 2/03/07
117.6
KC2.1
1 2/03/07
167.9
KC2.1
1 2/03/07
189
KC2.1
1 2/03/07
151.4
KC2.1
1 2/03/07
140.6
KC2.1
1 2/03/07
183.5
KC2.1
1 2/03/07
214
KC2.1
1 2/03/07
167.9
KC2.1
1 2/03/07
155.7
KC2.1
1 2/03/07
171.7
KC2.1
1 2/03/07
197.3
KC2.1
1 2/03/07
237.5
KC2.1
1 2/03/07
244.7
KC2.1
1 2/03/07
197.4
KC2.1
1 2/03/07
151.1
KC2.1
1 2/03/07
153.6
KC2.1
1 2/03/07
148.8
KC2.1
1 2/03/07
153.5
KC2.1
1 2/03/07
160.9
KC2.1
1 2/03/07
154.6
KC2.1
1 2/03/07
157
KC2.1
1 2/03/07
163.8
KC2.1
1 2/03/07
158.2
KC2.1
1 2/03/07
165.4
KC2.1
1 2/03/07
159.8
KC2.1
1 2/03/07
162.1
KC2.1
1 2/03/07
147.4
KC2.1
1 2/03/07
147.3
KC2.1
1 2/03/07
151.4
KC2.1
1 2/03/07
136.8
KC2.1
1 2/03/07
121.8
KC2.1
1 2/03/07
121
KC2.1
1 2/03/07
119.4
KC2.1
1 2/03/07
126.6
KC2.1
1 2/03/07
127.7
KC2.1
1 2/03/07
126.3
KC2.1
1 2/03/07
149.4
KC2.1
1 2/03/07
218.4
KC2.1
1 2/03/07
278.8
KC2.1
1 2/03/07
307.1
KC2.1
1 2/03/07
194.8
F-181

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/03/07
144.2
KC2.1
1 2/03/07
123.9
KC2.1
1 2/03/07
95.5
KC2.1
1 2/03/07
58.9
KC2.1
1 2/03/07
77.6
KC2.1
1 2/04/07
151.9
KC2.1
1 2/04/07
159.7
KC2.1
1 2/04/07
150.4
KC2.1
1 2/04/07
125.4
KC2.1
1 2/04/07
111.5
KC2.1
1 2/04/07
120.6
KC2.1
1 2/04/07
138
KC2.1
1 2/04/07
169.8
KC2.1
1 2/04/07
161.9
KC2.1
1 2/04/07
134.3
KC2.1
1 2/04/07
116.1
KC2.1
1 2/04/07
109
KC2.1
1 2/04/07
108.3
KC2.1
1 2/04/07
119.1
KC2.1
1 2/04/07
146.4
KC2.1
1 2/04/07
135.5
KC2.1
1 2/04/07
124
KC2.1
1 2/04/07
120.8
KC2.1
1 2/04/07
118.4
KC2.1
1 2/04/07
113
KC2.1
1 2/04/07
106.6
KC2.1
1 2/04/07
104.7
KC2.1
1 2/04/07
113.9
KC2.1
1 2/04/07
149.4
KC2.1
1 2/04/07
164.3
KC2.1
1 2/04/07
163.6
KC2.1
1 2/04/07
162.7
KC2.1
1 2/04/07
139.8
KC2.1
1 2/04/07
116.7
KC2.1
1 2/04/07
116.6
KC2.1
1 2/04/07
131.5
KC2.1
1 2/04/07
159.8
KC2.1
1 2/04/07
163.2
KC2.1
1 2/04/07
147.6
KC2.1
1 2/04/07
128.8
KC2.1
1 2/04/07
136.2
KC2.1
1 2/04/07
158.7
KC2.1
1 2/04/07
170.5
KC2.1
1 2/04/07
143.2
KC2.1
1 2/04/07
129.3
F-182

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/04/07
130.9
KC2.1
1 2/04/07
127.1
KC2.1
1 2/04/07
126.9
KC2.1
1 2/04/07
142.9
KC2.1
1 2/04/07
158.1
KC2.1
1 2/04/07
152.5
KC2.1
1 2/04/07
153.7
KC2.1
1 2/04/07
158.1
KC2.1
1 2/04/07
160.4
KC2.1
1 2/04/07
152.6
KC2.1
1 2/04/07
137.5
KC2.1
1 2/04/07
179.6
KC2.1
1 2/04/07
92.9
KC2.1
1 2/04/07
97.8
KC2.1
1 2/04/07
124.7
KC2.1
1 2/04/07
150.6
KC2.1
1 2/04/07
142.9
KC2.1
1 2/04/07
138.8
KC2.1
1 2/04/07
129
KC2.1
1 2/04/07
107.8
KC2.1
1 2/04/07
113.9
KC2.1
1 2/04/07
150.5
KC2.1
1 2/04/07
166.1
KC2.1
1 2/04/07
162.5
KC2.1
1 2/04/07
152.8
KC2.1
1 2/04/07
130.5
KC2.1
1 2/04/07
90.5
KC2.1
1 2/04/07
87.8
KC2.1
1 2/04/07
104.6
KC2.1
1 2/04/07
138
KC2.1
1 2/04/07
154.8
KC2.1
1 2/04/07
153.1
KC2.1
1 2/04/07
131.7
KC2.1
1 2/04/07
101.5
KC2.1
1 2/04/07
90.9
KC2.1
1 2/04/07
95.5
KC2.1
1 2/04/07
116.4
KC2.1
1 2/04/07
145.8
KC2.1
1 2/04/07
150.3
KC2.1
1 2/04/07
142.7
KC2.1
1 2/04/07
124.4
KC2.1
1 2/04/07
87
KC2.1
1 2/04/07
78.6
KC2.1
1 2/04/07
99.5
KC2.1
1 2/04/07
129.8
F-183

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/04/07
137.7
KC2.1
1 2/04/07
124.6
KC2.1
1 2/04/07
90.1
KC2.1
1 2/04/07
39.5
KC2.1
1 2/04/07
162.1
KC2.1
1 2/04/07
95
KC2.1
1 2/05/07
150.7
KC2.1
1 2/05/07
139.6
KC2.1
1 2/05/07
99.2
KC2.1
1 2/05/07
94.6
KC2.1
1 2/05/07
87.8
KC2.1
1 2/05/07
96.6
KC2.1
1 2/05/07
125.4
KC2.1
1 2/05/07
138.2
KC2.1
1 2/05/07
102.1
KC2.1
1 2/05/07
127.7
KC2.1
1 2/05/07
106
KC2.1
1 2/05/07
98.9
KC2.1
1 2/05/07
94.1
KC2.1
1 2/05/07
111.3
KC2.1
1 2/05/07
136.1
KC2.1
1 2/05/07
136.1
KC2.1
1 2/05/07
137.6
KC2.1
1 2/05/07
106.1
KC2.1
1 2/05/07
105
KC2.1
1 2/05/07
102.6
KC2.1
1 2/05/07
101.7
KC2.1
1 2/05/07
112.9
KC2.1
1 2/05/07
118.4
KC2.1
1 2/05/07
107.9
KC2.1
1 2/05/07
89.9
KC2.1
1 2/05/07
92.3
KC2.1
1 2/05/07
119.6
KC2.1
1 2/05/07
136.5
KC2.1
1 2/05/07
139
KC2.1
1 2/05/07
133.9
KC2.1
1 2/05/07
101.5
KC2.1
1 2/05/07
94.5
KC2.1
1 2/05/07
97.5
KC2.1
1 2/05/07
101.8
KC2.1
1 2/05/07
124
KC2.1
1 2/05/07
144.3
KC2.1
1 2/05/07
144
KC2.1
1 2/05/07
131.1
KC2.1
1 2/05/07
106.8
F-184

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/05/07
101.5
KC2.1
1 2/05/07
101.7
KC2.1
1 2/05/07
112.2
KC2.1
1 2/05/07
139
KC2.1
1 2/05/07
142.2
KC2.1
1 2/05/07
137.2
KC2.1
1 2/05/07
107.3
KC2.1
1 2/05/07
104.4
KC2.1
1 2/05/07
106.3
KC2.1
1 2/05/07
119.9
KC2.1
1 2/05/07
143.4
KC2.1
1 2/05/07
133.8
KC2.1
1 2/05/07
107.5
KC2.1
1 2/05/07
101.5
KC2.1
1 2/05/07
125.4
KC2.1
1 2/05/07
120.5
KC2.1
1 2/05/07
117
KC2.1
1 2/05/07
140.7
KC2.1
1 2/05/07
150.4
KC2.1
1 2/05/07
139.2
KC2.1
1 2/05/07
106.6
KC2.1
1 2/05/07
96
KC2.1
1 2/05/07
97.5
KC2.1
1 2/05/07
104
KC2.1
1 2/05/07
130.7
KC2.1
1 2/05/07
148.3
KC2.1
1 2/05/07
144.4
KC2.1
1 2/05/07
142.9
KC2.1
1 2/05/07
108.4
KC2.1
1 2/05/07
98.5
KC2.1
1 2/05/07
99.3
KC2.1
1 2/05/07
115.5
KC2.1
1 2/05/07
144.1
KC2.1
1 2/05/07
145.1
KC2.1
1 2/05/07
125.4
KC2.1
1 2/05/07
108.5
KC2.1
1 2/05/07
109.5
KC2.1
1 2/05/07
134.9
KC2.1
1 2/05/07
156.4
KC2.1
1 2/05/07
149.8
KC2.1
1 2/05/07
119.2
KC2.1
1 2/05/07
108.2
KC2.1
1 2/05/07
102.7
KC2.1
1 2/05/07
104.8
KC2.1
1 2/05/07
115.7
F-185

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/05/07
153.1
KC2.1
1 2/05/07
154.8
KC2.1
1 2/05/07
147.8
KC2.1
1 2/05/07
118.9
KC2.1
1 2/05/07
84.1
KC2.1
1 2/05/07
66.4
KC2.1
1 2/05/07
55.3
KC2.1
1 2/05/07
78.4
KC2.1
1 2/05/07
116.2
KC2.1
1 2/06/07
108.4
KC2.1
1 2/06/07
104.8
KC2.1
1 2/06/07
98.1
KC2.1
1 2/06/07
105.2
KC2.1
1 2/06/07
116.5
KC2.1
1 2/06/07
156.8
KC2.1
1 2/06/07
167.5
KC2.1
1 2/06/07
157.4
KC2.1
1 2/06/07
154.6
KC2.1
1 2/06/07
123.7
KC2.1
1 2/06/07
99.7
KC2.1
1 2/06/07
90.1
KC2.1
1 2/06/07
88
KC2.1
1 2/06/07
88.7
KC2.1
1 2/06/07
CO
CO
CO
KC2.1
1 2/06/07
83.4
KC2.1
1 2/06/07
84.1
KC2.1
1 2/06/07
82.7
KC2.1
1 2/06/07
101.5
KC2.1
1 2/06/07
127.2
KC2.1
1 2/06/07
129.3
KC2.1
1 2/06/07
114.6
KC2.1
1 2/06/07
102.4
KC2.1
1 2/06/07
86.5
KC2.1
1 2/06/07
83.5
KC2.1
1 2/06/07
102.9
KC2.1
1 2/06/07
120.7
KC2.1
1 2/06/07
118.6
KC2.1
1 2/06/07
123.5
KC2.1
1 2/06/07
121
KC2.1
1 2/06/07
104.3
KC2.1
1 2/06/07
76
KC2.1
1 2/06/07
81.6
KC2.1
1 2/06/07
94.1
KC2.1
1 2/06/07
119.2
KC2.1
1 2/06/07
122
F-186

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/06/07
128.5
KC2.1
1 2/06/07
134.6
KC2.1
1 2/06/07
126.5
KC2.1
1 2/06/07
114
KC2.1
1 2/06/07
109.9
KC2.1
1 2/06/07
86.2
KC2.1
1 2/06/07
76.2
KC2.1
1 2/06/07
86.5
KC2.1
1 2/06/07
107.9
KC2.1
1 2/06/07
113.7
KC2.1
1 2/06/07
112.6
KC2.1
1 2/06/07
109
KC2.1
1 2/06/07
101.7
KC2.1
1 2/06/07
77
KC2.1
1 2/06/07
78.3
KC2.1
1 2/06/07
102.7
KC2.1
1 2/06/07
117.3
KC2.1
1 2/06/07
125.4
KC2.1
1 2/06/07
131.5
KC2.1
1 2/06/07
149.8
KC2.1
1 2/06/07
154.7
KC2.1
1 2/06/07
112.4
KC2.1
1 2/06/07
87.6
KC2.1
1 2/06/07
75.7
KC2.1
1 2/06/07
82.4
KC2.1
1 2/06/07
105.3
KC2.1
1 2/06/07
119.9
KC2.1
1 2/06/07
122.1
KC2.1
1 2/06/07
105.4
KC2.1
1 2/06/07
83.5
KC2.1
1 2/06/07
77.3
KC2.1
1 2/06/07
88.2
KC2.1
1 2/06/07
114.7
KC2.1
1 2/06/07
126.5
KC2.1
1 2/06/07
106.9
KC2.1
1 2/06/07
83.2
KC2.1
1 2/06/07
79.9
KC2.1
1 2/06/07
113.7
KC2.1
1 2/06/07
119.9
KC2.1
1 2/06/07
139.2
KC2.1
1 2/06/07
143.7
KC2.1
1 2/06/07
137.6
KC2.1
1 2/06/07
114.4
KC2.1
1 2/06/07
86.3
KC2.1
1 2/06/07
81.4
F-187

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/06/07
98.3
KC2.1
1 2/06/07
135.4
KC2.1
1 2/06/07
147.6
KC2.1
1 2/06/07
161.8
KC2.1
1 2/06/07
179
KC2.1
1 2/06/07
150.4
KC2.1
1 2/06/07
91.7
KC2.1
1 2/06/07
67.5
KC2.1
1 2/06/07
41.8
KC2.1
1 2/06/07
58.5
KC2.1
1 2/06/07
158.7
KC2.1
1 2/07/07
80.2
KC2.1
1 2/07/07
80.1
KC2.1
1 2/07/07
78.9
KC2.1
1 2/07/07
79.1
KC2.1
1 2/07/07
79.7
KC2.1
1 2/07/07
84.3
KC2.1
1 2/07/07
89.7
KC2.1
1 2/07/07
93.6
KC2.1
1 2/07/07
76
KC2.1
1 2/07/07
51
KC2.1
1 2/07/07
77
KC2.1
1 2/07/07
148.4
KC2.1
1 2/07/07
299
KC2.1
1 2/07/07
331.8
KC2.1
1 2/07/07
56.8
KC2.1
1 2/07/07
62.8
KC2.1
1 2/07/07
72.6
KC2.1
1 2/07/07
74
KC2.1
1 2/07/07
75.9
KC2.1
1 2/07/07
82.5
KC2.1
1 2/07/07
105.3
KC2.1
1 2/07/07
124.4
KC2.1
1 2/07/07
118.4
KC2.1
1 2/07/07
87.6
KC2.1
1 2/07/07
87.7
KC2.1
1 2/07/07
95.3
KC2.1
1 2/07/07
120
KC2.1
1 2/07/07
139.4
KC2.1
1 2/07/07
97.9
KC2.1
1 2/07/07
81.9
KC2.1
1 2/07/07
85.9
KC2.1
1 2/07/07
98.9
KC2.1
1 2/07/07
128.8
KC2.1
1 2/07/07
122.7
F-188

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/07/07
96
KC2.1
1 2/07/07
85.1
KC2.1
1 2/07/07
85.9
KC2.1
1 2/07/07
93
KC2.1
1 2/07/07
105.3
KC2.1
1 2/07/07
120.9
KC2.1
1 2/07/07
108.7
KC2.1
1 2/07/07
92.1
KC2.1
1 2/07/07
98.5
KC2.1
1 2/07/07
110.3
KC2.1
1 2/07/07
127.7
KC2.1
1 2/07/07
125.5
KC2.1
1 2/07/07
113.1
KC2.1
1 2/07/07
90.1
KC2.1
1 2/07/07
89.2
KC2.1
1 2/07/07
94
KC2.1
1 2/07/07
106.6
KC2.1
1 2/07/07
125.3
KC2.1
1 2/07/07
118.2
KC2.1
1 2/07/07
103.3
KC2.1
1 2/07/07
100.3
KC2.1
1 2/07/07
103.3
KC2.1
1 2/07/07
109.5
KC2.1
1 2/07/07
129.3
KC2.1
1 2/07/07
118.9
KC2.1
1 2/07/07
107.7
KC2.1
1 2/07/07
101.8
KC2.1
1 2/07/07
104.7
KC2.1
1 2/07/07
123.9
KC2.1
1 2/07/07
149.4
KC2.1
1 2/07/07
179
KC2.1
1 2/07/07
209.3
KC2.1
1 2/07/07
333.1
KC2.1
1 2/07/07
637.5
KC2.1
1 2/07/07
494.7
KC2.1
1 2/07/07
196.5
KC2.1
1 2/07/07
61.7
KC2.1
1 2/07/07
89.6
KC2.1
1 2/07/07
129.8
KC2.1
1 2/07/07
133.3
KC2.1
1 2/07/07
137.3
KC2.1
1 2/07/07
138.2
KC2.1
1 2/07/07
137.5
KC2.1
1 2/07/07
141.8
KC2.1
1 2/07/07
143.9
F-189

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/07/07
147.7
KC2.1
1 2/07/07
151.1
KC2.1
1 2/07/07
166.5
KC2.1
1 2/07/07
154.1
KC2.1
1 2/07/07
142.5
KC2.1
1 2/07/07
134.5
KC2.1
1 2/07/07
123.7
KC2.1
1 2/07/07
94.7
KC2.1
1 2/07/07
56.6
KC2.1
1 2/07/07
76.5
KC2.1
1 2/07/07
101.1
KC2.1
1 2/07/07
102.1
KC2.1
1 2/08/07
78.1
KC2.1
1 2/08/07
101.5
KC2.1
1 2/08/07
103.5
KC2.1
1 2/08/07
92.1
KC2.1
1 2/08/07
90.9
KC2.1
1 2/08/07
86.2
KC2.1
1 2/08/07
86
KC2.1
1 2/08/07
85.4
KC2.1
1 2/08/07
85
KC2.1
1 2/08/07
59
KC2.1
1 2/08/07
62.1
KC2.1
1 2/08/07
76.8
KC2.1
1 2/08/07
88.9
KC2.1
1 2/08/07
93.3
KC2.1
1 2/08/07
91.7
KC2.1
1 2/08/07
92.3
KC2.1
1 2/08/07
91.8
KC2.1
1 2/08/07
92.2
KC2.1
1 2/08/07
96.9
KC2.1
1 2/08/07
96.7
KC2.1
1 2/08/07
95.9
KC2.1
1 2/08/07
107
KC2.1
1 2/08/07
119.3
KC2.1
1 2/08/07
117.7
KC2.1
1 2/08/07
77.1
KC2.1
1 2/08/07
71.7
KC2.1
1 2/08/07
90.3
KC2.1
1 2/08/07
97.6
KC2.1
1 2/08/07
94
KC2.1
1 2/08/07
95.4
KC2.1
1 2/08/07
97
KC2.1
1 2/08/07
99.2
KC2.1
1 2/08/07
100.3
F-190

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/08/07
100.6
KC2.1
1 2/08/07
95.2
KC2.1
1 2/08/07
82.6
KC2.1
1 2/08/07
72.6
KC2.1
1 2/08/07
64.7
KC2.1
1 2/08/07
68
KC2.1
1 2/08/07
78
KC2.1
1 2/08/07
84.3
KC2.1
1 2/08/07
87.3
KC2.1
1 2/08/07
87.7
KC2.1
1 2/08/07
89.2
KC2.1
1 2/08/07
85.6
KC2.1
1 2/08/07
86.4
KC2.1
1 2/08/07
86.4
KC2.1
1 2/08/07
83.4
KC2.1
1 2/08/07
82.2
KC2.1
1 2/08/07
76.7
KC2.1
1 2/08/07
68.2
KC2.1
1 2/08/07
68.2
KC2.1
1 2/08/07
82
KC2.1
1 2/08/07
87.7
KC2.1
1 2/08/07
90.9
KC2.1
1 2/08/07
88.4
KC2.1
1 2/08/07
85
KC2.1
1 2/08/07
85.8
KC2.1
1 2/08/07
95.2
KC2.1
1 2/08/07
89.5
KC2.1
1 2/08/07
71
KC2.1
1 2/08/07
60.3
KC2.1
1 2/08/07
69.7
KC2.1
1 2/08/07
83.1
KC2.1
1 2/08/07
88.4
KC2.1
1 2/08/07
92.7
KC2.1
1 2/08/07
98.7
KC2.1
1 2/08/07
116.2
KC2.1
1 2/08/07
118.8
KC2.1
1 2/08/07
98.4
KC2.1
1 2/08/07
78.1
KC2.1
1 2/08/07
66.3
KC2.1
1 2/08/07
70.4
KC2.1
1 2/08/07
83
KC2.1
1 2/08/07
87
KC2.1
1 2/08/07
90.4
KC2.1
1 2/08/07
88.3
KC2.1
1 2/08/07
91.1
F-191

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/08/07
90.4
KC2.1
1 2/08/07
90.9
KC2.1
1 2/08/07
92.3
KC2.1
1 2/08/07
88.3
KC2.1
1 2/08/07
84.7
KC2.1
1 2/08/07
80.9
KC2.1
1 2/08/07
74.8
KC2.1
1 2/08/07
66.7
KC2.1
1 2/08/07
56.2
KC2.1
1 2/08/07
43.7
KC2.1
1 2/08/07
39
KC2.1
1 2/08/07
79.3
KC2.1
1 2/08/07
78.9
KC2.1
1 2/09/07
56.2
KC2.1
1 2/09/07
59.3
KC2.1
1 2/09/07
68.5
KC2.1
1 2/09/07
71.1
KC2.1
1 2/09/07
74.8
KC2.1
1 2/09/07
75.7
KC2.1
1 2/09/07
74.4
KC2.1
1 2/09/07
76.5
KC2.1
1 2/09/07
79.9
KC2.1
1 2/09/07
82.7
KC2.1
1 2/09/07
88.2
KC2.1
1 2/09/07
94.6
KC2.1
1 2/09/07
93.2
KC2.1
1 2/09/07
94.4
KC2.1
1 2/09/07
98.6
KC2.1
1 2/09/07
98.5
KC2.1
1 2/09/07
96.7
KC2.1
1 2/09/07
77.2
KC2.1
1 2/09/07
66.2
KC2.1
1 2/09/07
82.6
KC2.1
1 2/09/07
71.8
KC2.1
1 2/09/07
67.7
KC2.1
1 2/09/07
59.9
KC2.1
1 2/09/07
56.9
KC2.1
1 2/09/07
56.6
KC2.1
1 2/09/07
57
KC2.1
1 2/09/07
59
KC2.1
1 2/09/07
62
KC2.1
1 2/09/07
61.8
KC2.1
1 2/09/07
63.3
KC2.1
1 2/09/07
67.8
KC2.1
1 2/09/07
71
F-192

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/09/07
70
KC2.1
1 2/09/07
72.1
KC2.1
1 2/09/07
76
KC2.1
1 2/09/07
74.8
KC2.1
1 2/09/07
77.2
KC2.1
1 2/09/07
83.5
KC2.1
1 2/09/07
91.8
KC2.1
1 2/09/07
78.2
KC2.1
1 2/09/07
70.6
KC2.1
1 2/09/07
71.8
KC2.1
1 2/09/07
73.2
KC2.1
1 2/09/07
76.9
KC2.1
1 2/09/07
82.8
KC2.1
1 2/09/07
88.4
KC2.1
1 2/09/07
93.5
KC2.1
1 2/09/07
105.9
KC2.1
1 2/09/07
114.7
KC2.1
1 2/09/07
119
KC2.1
1 2/09/07
120
KC2.1
1 2/09/07
123.7
KC2.1
1 2/09/07
122
KC2.1
1 2/09/07
110.4
KC2.1
1 2/09/07
99.5
KC2.1
1 2/09/07
97.9
KC2.1
1 2/09/07
130.2
KC2.1
1 2/09/07
135.1
KC2.1
1 2/09/07
124.1
KC2.1
1 2/09/07
121.5
KC2.1
1 2/09/07
114.5
KC2.1
1 2/09/07
96.6
KC2.1
1 2/09/07
78
KC2.1
1 2/09/07
88
KC2.1
1 2/09/07
109.3
KC2.1
1 2/09/07
100.7
KC2.1
1 2/09/07
81.4
KC2.1
1 2/09/07
64.8
KC2.1
1 2/09/07
52
KC2.1
1 2/09/07
102.3
KC2.1
1 2/09/07
75.8
KC2.1
1 2/10/07
31
KC2.1
1 2/10/07
26.4
KC2.1
1 2/10/07
34.5
KC2.1
1 2/10/07
35.2
KC2.1
1 2/10/07
37.4
KC2.1
1 2/10/07
37.7
F-193

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/10/07
39.5
KC2.1
1 2/10/07
40.4
KC2.1
1 2/10/07
42.1
KC2.1
1 2/10/07
43
KC2.1
1 2/10/07
41.6
KC2.1
1 2/10/07
41.6
KC2.1
1 2/10/07
42.3
KC2.1
1 2/10/07
42.1
KC2.1
1 2/10/07
42.7
KC2.1
1 2/10/07
42.6
KC2.1
1 2/10/07
42.7
KC2.1
1 2/10/07
43.4
KC2.1
1 2/10/07
41.3
KC2.1
1 2/10/07
41.5
KC2.1
1 2/10/07
39.5
KC2.1
1 2/10/07
41.7
KC2.1
1 2/10/07
48.5
KC2.1
1 2/10/07
51.7
KC2.1
1 2/10/07
53.6
KC2.1
1 2/10/07
55.9
KC2.1
1 2/10/07
56.9
KC2.1
1 2/10/07
57.5
KC2.1
1 2/10/07
59
KC2.1
1 2/10/07
66.9
KC2.1
1 2/10/07
77.6
KC2.1
1 2/10/07
79.3
KC2.1
1 2/10/07
81.1
KC2.1
1 2/10/07
86.2
KC2.1
1 2/10/07
85.5
KC2.1
1 2/10/07
84.1
KC2.1
1 2/10/07
82.9
KC2.1
1 2/10/07
76.4
KC2.1
1 2/10/07
69.9
KC2.1
1 2/10/07
65.4
KC2.1
1 2/10/07
69.8
KC2.1
1 2/10/07
75.2
KC2.1
1 2/10/07
76.5
KC2.1
1 2/10/07
74.7
KC2.1
1 2/10/07
64.3
KC2.1
1 2/10/07
64.4
KC2.1
1 2/10/07
73.9
KC2.1
1 2/10/07
81
KC2.1
1 2/10/07
81.7
KC2.1
1 2/10/07
81.6
KC2.1
1 2/15/07
58.1
F-194

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/15/07
58.3
KC2.1
1 2/15/07
59.2
KC2.1
1 2/15/07
59.9
KC2.1
1 2/15/07
61.2
KC2.1
1 2/15/07
61.2
KC2.1
1 2/15/07
61.2
KC2.1
1 2/15/07
62.4
KC2.1
1 2/15/07
62.9
KC2.1
1 2/15/07
64.2
KC2.1
1 2/15/07
68.4
KC2.1
1 2/15/07
71
KC2.1
1 2/15/07
72.9
KC2.1
1 2/15/07
74.1
KC2.1
1 2/15/07
71.3
KC2.1
1 2/15/07
71
KC2.1
1 2/15/07
69.5
KC2.1
1 2/15/07
66.9
KC2.1
1 2/15/07
62.9
KC2.1
1 2/15/07
58.3
KC2.1
1 2/15/07
50.6
KC2.1
1 2/15/07
41.2
KC2.1
1 2/15/07
33.3
KC2.1
1 2/15/07
28.8
KC2.1
1 2/15/07
22.5
KC2.1
1 2/15/07
205.8
KC2.1
1 2/1 7/07
53.5
KC2.1
1 2/1 7/07
53.6
KC2.1
1 2/1 7/07
55.7
KC2.1
1 2/1 7/07
55.2
KC2.1
1 2/1 7/07
56.1
KC2.1
1 2/1 7/07
57.7
KC2.1
1 2/1 7/07
56.9
KC2.1
1 2/1 7/07
59.3
KC2.1
1 2/1 7/07
59.6
KC2.1
1 2/1 7/07
59.8
KC2.1
1 2/1 7/07
60.5
KC2.1
1 2/1 7/07
60
KC2.1
1 2/1 7/07
60.1
KC2.1
1 2/1 7/07
61.4
KC2.1
1 2/1 7/07
60.7
KC2.1
1 2/1 7/07
58.9
KC2.1
1 2/1 7/07
59.7
KC2.1
1 2/1 7/07
58.9
KC2.1
1 2/1 7/07
57.2
KC2.1
1 2/1 7/07
55.6
F-195

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/1 7/07
51.6
KC2.1
1 2/1 7/07
48
KC2.1
1 2/1 7/07
53.1
KC2.1
1 2/1 7/07
59.9
KC2.1
1 2/1 7/07
61.8
KC2.1
1 2/1 7/07
62
KC2.1
1 2/1 7/07
61.8
KC2.1
1 2/1 7/07
61.3
KC2.1
1 2/1 7/07
62.9
KC2.1
1 2/1 7/07
64.4
KC2.1
1 2/1 7/07
65.1
KC2.1
1 2/1 7/07
65.8
KC2.1
1 2/1 7/07
69.9
KC2.1
1 2/1 7/07
71
KC2.1
1 2/1 7/07
72.5
KC2.1
1 2/1 7/07
75.9
KC2.1
1 2/1 7/07
74.5
KC2.1
1 2/1 7/07
73.7
KC2.1
1 2/1 7/07
79.8
KC2.1
1 2/1 7/07
87.9
KC2.1
1 2/1 7/07
83.3
KC2.1
1 2/1 7/07
55.7
KC2.1
1 2/1 7/07
61.9
KC2.1
1 2/1 7/07
69.6
KC2.1
1 2/1 7/07
75.8
KC2.1
1 2/1 7/07
73.5
KC2.1
1 2/1 7/07
73.5
KC2.1
1 2/1 7/07
71.2
KC2.1
1 2/1 7/07
64.3
KC2.1
1 2/1 7/07
54.9
KC2.1
1 2/1 7/07
46.9
KC2.1
1 2/1 7/07
36.1
KC2.1
1 2/1 7/07
10.7
KC2.1
1 2/1 7/07
45.3
KC2.1
1 2/18/07
76.2
KC2.1
1 2/18/07
78.7
KC2.1
1 2/18/07
86.7
KC2.1
1 2/18/07
89.4
KC2.1
1 2/18/07
86.2
KC2.1
1 2/18/07
84.2
KC2.1
1 2/18/07
86.4
KC2.1
1 2/18/07
95.3
KC2.1
1 2/18/07
113.6
KC2.1
1 2/18/07
124.1
KC2.1
1 2/18/07
124.5
F-196

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/18/07
124.9
KC2.1
1 2/18/07
118.6
KC2.1
1 2/18/07
122.1
KC2.1
1 2/18/07
135.5
KC2.1
1 2/18/07
150.2
KC2.1
1 2/18/07
83.5
KC2.1
1 2/18/07
198.5
KC2.1
1 2/18/07
206
KC2.1
1 2/18/07
200.3
KC2.1
1 2/18/07
187.7
KC2.1
1 2/18/07
172.4
KC2.1
1 2/18/07
152.2
KC2.1
1 2/18/07
146.4
KC2.1
1 2/18/07
151
KC2.1
1 2/18/07
164
KC2.1
1 2/18/07
180.4
KC2.1
1 2/18/07
176.1
KC2.1
1 2/18/07
167.1
KC2.1
1 2/18/07
150.1
KC2.1
1 2/18/07
131.4
KC2.1
1 2/18/07
113.3
KC2.1
1 2/18/07
93.4
KC2.1
1 2/18/07
67
KC2.1
1 2/18/07
50
KC2.1
1 2/18/07
35.8
KC2.1
1 2/18/07
20.9
KC2.1
1 2/18/07
36.3
KC2.1
1 2/18/07
56.6
KC2.1
1 2/18/07
55.7
KC2.1
1 2/18/07
53.6
KC2.1
1 2/18/07
48.8
KC2.1
1 2/18/07
45.1
KC2.1
1 2/18/07
41
KC2.1
1 2/18/07
45.6
KC2.1
1 2/18/07
48.7
KC2.1
1 2/18/07
50
KC2.1
1 2/18/07
51.4
KC2.1
1 2/18/07
50.9
KC2.1
1 2/18/07
50.9
KC2.1
1 2/18/07
52.3
KC2.1
1 2/18/07
50.7
KC2.1
1 2/18/07
48.6
KC2.1
1 2/18/07
46.7
KC2.1
1 2/18/07
42.3
KC2.1
1 2/18/07
37.2
F-197

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/18/07
32.8
KC2.1
1 2/18/07
32.9
KC2.1
1 2/18/07
151.1
KC2.1
1 2/18/07
54.3
KC2.1
1 2/19/07
82.7
KC2.1
1 2/19/07
114.1
KC2.1
1 2/19/07
181.2
KC2.1
1 2/19/07
233.2
KC2.1
1 2/19/07
216.2
KC2.1
1 2/19/07
126
KC2.1
1 2/19/07
90.8
KC2.1
1 2/19/07
97
KC2.1
1 2/19/07
92.8
KC2.1
1 2/19/07
101.3
KC2.1
1 2/19/07
175.8
KC2.1
1 2/19/07
254.9
KC2.1
1 2/19/07
265.1
KC2.1
1 2/19/07
221.3
KC2.1
1 2/19/07
159
KC2.1
1 2/19/07
146.2
KC2.1
1 2/19/07
151.2
KC2.1
1 2/19/07
138.1
KC2.1
1 2/19/07
129.1
KC2.1
1 2/19/07
118.4
KC2.1
1 2/19/07
111.4
KC2.1
1 2/19/07
112.4
KC2.1
1 2/19/07
109.7
KC2.1
1 2/19/07
109.2
KC2.1
1 2/19/07
112.8
KC2.1
1 2/19/07
122.2
KC2.1
1 2/19/07
127.1
KC2.1
1 2/19/07
151.7
KC2.1
1 2/19/07
185.7
KC2.1
1 2/19/07
204.4
KC2.1
1 2/19/07
162.7
KC2.1
1 2/19/07
128.8
KC2.1
1 2/19/07
110.1
KC2.1
1 2/19/07
113.2
KC2.1
1 2/19/07
112.5
KC2.1
1 2/19/07
107.1
KC2.1
1 2/19/07
105.5
KC2.1
1 2/19/07
114.6
KC2.1
1 2/19/07
127.6
KC2.1
1 2/19/07
146.4
KC2.1
1 2/19/07
158.7
F-198

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/19/07
149.4
KC2.1
1 2/19/07
162.1
KC2.1
1 2/19/07
177.8
KC2.1
1 2/19/07
181.9
KC2.1
1 2/19/07
127
KC2.1
1 2/19/07
95.3
KC2.1
1 2/19/07
98
KC2.1
1 2/19/07
101.5
KC2.1
1 2/19/07
102.6
KC2.1
1 2/19/07
106.2
KC2.1
1 2/19/07
112.9
KC2.1
1 2/19/07
115.4
KC2.1
1 2/19/07
126.7
KC2.1
1 2/19/07
136.5
KC2.1
1 2/19/07
161.2
KC2.1
1 2/19/07
158.5
KC2.1
1 2/19/07
91.3
KC2.1
1 2/19/07
48.8
KC2.1
1 2/19/07
87.9
KC2.1
1 2/19/07
145.1
KC2.1
1 2/19/07
142.1
KC2.1
1 2/19/07
67.4
KC2.1
1 2/19/07
37.2
KC2.1
1 2/19/07
45.7
KC2.1
1 2/19/07
61.8
KC2.1
1 2/19/07
75.3
KC2.1
1 2/19/07
CO
CO
CO
KC2.1
1 2/19/07
110.5
KC2.1
1 2/19/07
143.1
KC2.1
1 2/19/07
156.2
KC2.1
1 2/19/07
108.8
KC2.1
1 2/19/07
52.2
KC2.1
1 2/19/07
46.4
KC2.1
1 2/19/07
80
KC2.1
1 2/19/07
178
KC2.1
1 2/19/07
288.9
KC2.1
1 2/19/07
333.5
KC2.1
1 2/19/07
275.6
KC2.1
1 2/19/07
67.8
KC2.1
1 2/19/07
43.3
KC2.1
1 2/19/07
55.4
KC2.1
1 2/19/07
134.2
KC2.1
1 2/19/07
249.8
KC2.1
1 2/19/07
235.4
KC2.1
1 2/19/07
69.8
F-199

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/19/07
44.4
KC2.1
1 2/19/07
66.4
KC2.1
1 2/19/07
135.6
KC2.1
1 2/19/07
181.5
KC2.1
1 2/19/07
112.4
KC2.1
1 2/19/07
175.4
KC2.1
1 2/19/07
131
KC2.1
1 2/20/07
101.6
KC2.1
1 2/20/07
102.2
KC2.1
1 2/20/07
106.7
KC2.1
1 2/20/07
110.8
KC2.1
1 2/20/07
108.8
KC2.1
1 2/20/07
94.2
KC2.1
1 2/20/07
84.7
KC2.1
1 2/20/07
79.7
KC2.1
1 2/20/07
75.9
KC2.1
1 2/20/07
74
KC2.1
1 2/20/07
71.6
KC2.1
1 2/20/07
72.5
KC2.1
1 2/20/07
77.1
KC2.1
1 2/20/07
79
KC2.1
1 2/20/07
83.5
KC2.1
1 2/20/07
86.9
KC2.1
1 2/20/07
101.9
KC2.1
1 2/20/07
133.2
KC2.1
1 2/20/07
150
KC2.1
1 2/20/07
110.9
KC2.1
1 2/20/07
79.9
KC2.1
1 2/20/07
77.8
KC2.1
1 2/20/07
80.1
KC2.1
1 2/20/07
74.8
KC2.1
1 2/20/07
70.8
KC2.1
1 2/20/07
73.8
KC2.1
1 2/20/07
77.1
KC2.1
1 2/20/07
77.1
KC2.1
1 2/20/07
78.1
KC2.1
1 2/20/07
79.1
KC2.1
1 2/20/07
88
KC2.1
1 2/20/07
106.6
KC2.1
1 2/20/07
130.6
KC2.1
1 2/20/07
112.8
KC2.1
1 2/20/07
69.6
KC2.1
1 2/20/07
129.2
KC2.1
1 2/20/07
174.7
KC2.1
1 2/20/07
176.4
F-200

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/20/07
137.5
KC2.1
1 2/20/07
57.9
KC2.1
1 2/20/07
101.4
KC2.1
1 2/20/07
164.9
KC2.1
1 2/20/07
182.4
KC2.1
1 2/20/07
141
KC2.1
1 2/20/07
94
KC2.1
1 2/20/07
159.7
KC2.1
1 2/20/07
204.5
KC2.1
1 2/20/07
178.9
KC2.1
1 2/20/07
132.7
KC2.1
1 2/20/07
127.5
KC2.1
1 2/20/07
128.6
KC2.1
1 2/20/07
123.6
KC2.1
1 2/20/07
112.3
KC2.1
1 2/20/07
116.1
KC2.1
1 2/20/07
117.8
KC2.1
1 2/20/07
121.8
KC2.1
1 2/20/07
120.4
KC2.1
1 2/20/07
119.2
KC2.1
1 2/20/07
118.9
KC2.1
1 2/20/07
127.3
KC2.1
1 2/20/07
125.2
KC2.1
1 2/20/07
134.1
KC2.1
1 2/20/07
149.2
KC2.1
1 2/20/07
139.7
KC2.1
1 2/20/07
94.2
KC2.1
1 2/20/07
107.2
KC2.1
1 2/20/07
111.5
KC2.1
1 2/20/07
129.5
KC2.1
1 2/20/07
146.8
KC2.1
1 2/20/07
162.1
KC2.1
1 2/20/07
147.9
KC2.1
1 2/20/07
99
KC2.1
1 2/20/07
80.5
KC2.1
1 2/20/07
82.8
KC2.1
1 2/20/07
83.1
KC2.1
1 2/20/07
81.9
KC2.1
1 2/20/07
87.6
KC2.1
1 2/20/07
91.5
KC2.1
1 2/20/07
111.1
KC2.1
1 2/20/07
134.5
KC2.1
1 2/20/07
164.8
KC2.1
1 2/20/07
189.5
KC2.1
1 2/20/07
149.8
F-201

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/20/07
85.8
KC2.1
1 2/20/07
85.3
KC2.1
1 2/20/07
83.7
KC2.1
1 2/20/07
79
KC2.1
1 2/20/07
71.7
KC2.1
1 2/20/07
69.4
KC2.1
1 2/20/07
58.8
KC2.1
1 2/20/07
66.2
KC2.1
1 2/20/07
165.1
KC2.1
1 2/20/07
156
KC2.1
12/21/07
56.7
KC2.1
12/21/07
54.5
KC2.1
12/21/07
55.1
KC2.1
12/21/07
54.4
KC2.1
12/21/07
56
KC2.1
12/21/07
57.5
KC2.1
12/21/07
59.5
KC2.1
12/21/07
62.3
KC2.1
12/21/07
60.8
KC2.1
12/21/07
60.2
KC2.1
12/21/07
60.4
KC2.1
12/21/07
62.5
KC2.1
12/21/07
65.7
KC2.1
12/21/07
63.5
KC2.1
12/21/07
66.9
KC2.1
12/21/07
68.6
KC2.1
12/21/07
73.7
KC2.1
12/21/07
72.4
KC2.1
12/21/07
72.3
KC2.1
12/21/07
71.6
KC2.1
12/21/07
72
KC2.1
12/21/07
72
KC2.1
12/21/07
72.2
KC2.1
12/21/07
70.6
KC2.1
12/21/07
71.3
KC2.1
12/21/07
72.4
KC2.1
12/21/07
71.4
KC2.1
12/21/07
73
KC2.1
12/21/07
70.9
KC2.1
12/21/07
72.1
KC2.1
12/21/07
72.4
KC2.1
12/21/07
73.5
KC2.1
12/21/07
72.2
KC2.1
12/21/07
73.8
KC2.1
12/21/07
70.9
F-202

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
12/21/07
70.7
KC2.1
12/21/07
71.5
KC2.1
12/21/07
76.5
KC2.1
12/21/07
81.5
KC2.1
12/21/07
85.1
KC2.1
12/21/07
77.7
KC2.1
12/21/07
71.8
KC2.1
12/21/07
74.4
KC2.1
12/21/07
82.8
KC2.1
12/21/07
97.1
KC2.1
12/21/07
109.6
KC2.1
12/21/07
112.6
KC2.1
12/21/07
76.6
KC2.1
12/21/07
76.6
KC2.1
12/21/07
72.1
KC2.1
12/21/07
68
KC2.1
12/21/07
68.5
KC2.1
12/21/07
70.6
KC2.1
12/21/07
78.7
KC2.1
12/21/07
90.5
KC2.1
12/21/07
108.7
KC2.1
12/21/07
128.1
KC2.1
12/21/07
124
KC2.1
12/21/07
88.6
KC2.1
12/21/07
76.6
KC2.1
12/21/07
63.1
KC2.1
12/21/07
42.3
KC2.1
12/21/07
68.6
KC2.1
12/21/07
105.8
KC2.1
12/21/07
107.1
KC2.1
12/22/07
74.7
KC2.1
12/22/07
80.3
KC2.1
12/22/07
63
KC2.1
12/22/07
60
KC2.1
12/22/07
55.8
KC2.1
12/22/07
57.1
KC2.1
12/22/07
39.5
KC2.1
12/22/07
81.2
KC2.1
12/22/07
96.8
KC2.1
12/22/07
100.8
KC2.1
12/22/07
94.1
KC2.1
12/22/07
81.3
KC2.1
12/22/07
100.1
KC2.1
12/22/07
80
KC2.1
12/22/07
85.7
F-203

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
12/22/07
86.5
KC2.1
12/22/07
100.5
KC2.1
12/22/07
134.7
KC2.1
12/22/07
156.7
KC2.1
12/22/07
148.3
KC2.1
12/22/07
107
KC2.1
12/22/07
84.7
KC2.1
12/22/07
77.5
KC2.1
12/22/07
91.2
KC2.1
12/22/07
135.6
KC2.1
12/22/07
171.3
KC2.1
12/22/07
185.9
KC2.1
12/22/07
140.8
KC2.1
12/22/07
120.6
KC2.1
12/22/07
149.2
KC2.1
12/22/07
174.4
KC2.1
12/22/07
171.9
KC2.1
12/22/07
163.8
KC2.1
12/22/07
162.6
KC2.1
12/22/07
155.8
KC2.1
12/22/07
149.1
KC2.1
12/22/07
136.3
KC2.1
12/22/07
119.9
KC2.1
12/22/07
108.9
KC2.1
12/22/07
105.7
KC2.1
12/22/07
105.1
KC2.1
12/22/07
124.4
KC2.1
12/22/07
134
KC2.1
12/22/07
120.1
KC2.1
12/22/07
64.4
KC2.1
12/22/07
55.1
KC2.1
12/22/07
72.7
KC2.1
12/22/07
98.7
KC2.1
12/22/07
121.6
KC2.1
12/22/07
110.8
KC2.1
12/22/07
66.5
KC2.1
12/22/07
11.2
KC2.1
12/22/07
10.2
KC2.1
12/22/07
65.7
KC2.1
12/23/07
50.6
KC2.1
12/23/07
48.5
KC2.1
12/23/07
49.7
KC2.1
12/23/07
47.6
KC2.1
12/23/07
49.4
KC2.1
12/23/07
49.5
F-204

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
12/23/07
54.6
KC2.1
12/23/07
67.6
KC2.1
12/23/07
73.6
KC2.1
12/23/07
55.5
KC2.1
12/23/07
37.5
KC2.1
12/23/07
32.1
KC2.1
12/23/07
41.9
KC2.1
12/23/07
57.4
KC2.1
12/23/07
64.1
KC2.1
1 2/24/07
57.5
KC2.1
1 2/24/07
62.9
KC2.1
1 2/24/07
67.4
KC2.1
1 2/24/07
69.8
KC2.1
1 2/24/07
59.6
KC2.1
1 2/24/07
57.5
KC2.1
1 2/24/07
59.4
KC2.1
1 2/24/07
57.8
KC2.1
1 2/24/07
60.9
KC2.1
1 2/24/07
74.7
KC2.1
1 2/24/07
80.9
KC2.1
1 2/24/07
82.6
KC2.1
1 2/24/07
70.4
KC2.1
1 2/26/07
51.3
KC2.1
1 2/26/07
50.9
KC2.1
1 2/26/07
53.8
KC2.1
1 2/26/07
59.9
KC2.1
1 2/26/07
70.8
KC2.1
1 2/26/07
71.8
KC2.1
1 2/26/07
67.1
KC2.1
1 2/26/07
55.4
KC2.1
1 2/26/07
58.4
KC2.1
1 2/26/07
54.6
KC2.1
1 2/26/07
57.4
KC2.1
1 2/26/07
59.9
KC2.1
1 2/26/07
71.6
KC2.1
1 2/26/07
86.4
KC2.1
1 2/26/07
95.8
KC2.1
1 2/26/07
95.5
KC2.1
1 2/26/07
52.1
KC2.1
1 2/26/07
33.2
KC2.1
12/27/07
56.2
KC2.1
12/27/07
67.7
KC2.1
12/27/07
75.6
KC2.1
12/27/07
60.6
KC2.1
12/27/07
54.3
F-205

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
12/27/07
54
KC2.1
12/27/07
61.2
KC2.1
12/27/07
73.6
KC2.1
12/27/07
84
KC2.1
12/27/07
82.8
KC2.1
12/27/07
94.2
KC2.1
12/27/07
152.7
KC2.1
12/27/07
220
KC2.1
12/27/07
110.6
KC2.1
12/27/07
76.7
KC2.1
12/27/07
71.8
KC2.1
12/27/07
65.4
KC2.1
12/27/07
60.2
KC2.1
12/27/07
64.5
KC2.1
12/27/07
86.8
KC2.1
12/27/07
11.7
KC2.1
12/27/07
8
KC2.1
12/27/07
233.6
KC2.1
1 2/28/07
92.1
KC2.1
1 2/28/07
47.2
KC2.1
1 2/28/07
52.1
KC2.1
1 2/28/07
52.1
KC2.1
1 2/28/07
51.8
KC2.1
1 2/28/07
49.4
KC2.1
1 2/28/07
50.6
KC2.1
1 2/28/07
48.4
KC2.1
1 2/28/07
50.7
KC2.1
1 2/28/07
47.3
KC2.1
1 2/28/07
47.8
KC2.1
1 2/28/07
52.8
KC2.1
1 2/28/07
50.6
KC2.1
1 2/28/07
46.9
KC2.1
1 2/28/07
47.2
KC2.1
1 2/28/07
43.6
KC2.1
1 2/28/07
44.5
KC2.1
1 2/28/07
43.5
KC2.1
1 2/28/07
47.1
KC2.1
1 2/28/07
56.6
KC2.1
1 2/28/07
62.8
KC2.1
1 2/28/07
51.1
KC2.1
1 2/28/07
45.5
KC2.1
1 2/28/07
47.3
KC2.1
1 2/28/07
50.5
KC2.1
1 2/28/07
60.8
KC2.1
1 2/28/07
67.2
F-206

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
1 2/28/07
69.5
KC2.1
1 2/28/07
60.7
KC2.1
1 2/28/07
51.3
KC2.1
1 2/28/07
49.3
KC2.1
1 2/28/07
46.8
KC2.1
1 2/28/07
48
KC2.1
1 2/28/07
47.7
KC2.1
1 2/28/07
52.3
KC2.1
1 2/28/07
55.3
KC2.1
1 2/28/07
61.2
KC2.1
1 2/28/07
48.8
KC2.1
1 2/28/07
32.7
KC2.1
1 2/28/07
33.3
KC2.1
1 2/28/07
50.7
KC2.1
1 2/28/07
52.1
KC2.1
1 2/29/07
86.4
KC2.1
1 2/29/07
100.4
KC2.1
1 2/29/07
47.8
KC2.1
1 2/29/07
45.5
KC2.1
1 2/29/07
44
KC2.1
1 2/29/07
44
KC2.1
1 2/29/07
45.6
KC2.1
1 2/29/07
45.1
KC2.1
1 2/29/07
46.4
KC2.1
1 2/29/07
40.3
KC2.1
1 2/29/07
34.5
KC2.1
1 2/29/07
26.1
KC2.1
1 2/29/07
28
KC2.1
01/02/08
27.7
KC2.1
01/02/08
15
KC2.1
01/02/08
12.8
KC2.1
01/02/08
14.9
KC2.1
01/02/08
18
KC2.1
01/02/08
19.6
KC2.1
01/02/08
19.7
KC2.1
01/02/08
22.2
KC2.1
01/02/08
23.9
KC2.1
01/02/08
25
KC2.1
01/02/08
26.3
KC2.1
01/02/08
27.1
KC2.1
01/02/08
27
KC2.1
01/02/08
28.2
KC2.1
01/02/08
28.5
KC2.1
01/02/08
30
KC2.1
01/02/08
29.2
F-207

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/02/08
30.7
KC2.1
01/02/08
32.2
KC2.1
01/02/08
32.5
KC2.1
01/02/08
33.7
KC2.1
01/02/08
33.8
KC2.1
01/02/08
34.7
KC2.1
01/02/08
35.3
KC2.1
01/02/08
34.3
KC2.1
01/02/08
34.2
KC2.1
01/02/08
35.3
KC2.1
01/02/08
34.9
KC2.1
01/02/08
34.1
KC2.1
01/02/08
34.9
KC2.1
01/02/08
44.7
KC2.1
01/02/08
66.6
KC2.1
01/08/08
44
KC2.1
01/08/08
16
KC2.1
01/08/08
18.7
KC2.1
01/08/08
24.2
KC2.1
01/08/08
19.5
KC2.1
01/08/08
19.8
KC2.1
01/08/08
19.9
KC2.1
01/08/08
19.7
KC2.1
01/08/08
19.7
KC2.1
01/08/08
19.1
KC2.1
01/08/08
19.1
KC2.1
01/08/08
19.6
KC2.1
01/08/08
19.5
KC2.1
01/08/08
19
KC2.1
01/08/08
18.9
KC2.1
01/08/08
18.4
KC2.1
01/08/08
17.6
KC2.1
01/08/08
18.5
KC2.1
01/08/08
20.6
KC2.1
01/08/08
21.5
KC2.1
01/08/08
21.4
KC2.1
01/08/08
21.1
KC2.1
01/08/08
21.4
KC2.1
01/08/08
21.9
KC2.1
01/08/08
22
KC2.1
01/08/08
22.1
KC2.1
01/08/08
21.5
KC2.1
01/08/08
22.4
KC2.1
01/08/08
22.5
KC2.1
01/08/08
22.2
F-208

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/08/08
22.8
KC2.1
01/08/08
22.5
KC2.1
01/08/08
22.6
KC2.1
01/08/08
22.6
KC2.1
01/08/08
22.1
KC2.1
01/08/08
22.1
KC2.1
01/08/08
22.9
KC2.1
01/08/08
24
KC2.1
01/08/08
24.5
KC2.1
01/08/08
24
KC2.1
01/08/08
24
KC2.1
01/08/08
23.7
KC2.1
01/08/08
23.2
KC2.1
01/08/08
22.2
KC2.1
01/08/08
22.3
KC2.1
01/08/08
23.6
KC2.1
01/08/08
23.4
KC2.1
01/08/08
23
KC2.1
01/08/08
22.8
KC2.1
01/08/08
23.8
KC2.1
01/08/08
23.6
KC2.1
01/08/08
23.9
KC2.1
01/08/08
24.3
KC2.1
01/08/08
24.7
KC2.1
01/08/08
24.9
KC2.1
01/08/08
25.4
KC2.1
01/08/08
26.8
KC2.1
01/08/08
27.6
KC2.1
01/08/08
28
KC2.1
01/08/08
28.7
KC2.1
01/08/08
29.4
KC2.1
01/08/08
30.3
KC2.1
01/08/08
31
KC2.1
01/08/08
31.8
KC2.1
01/08/08
32.2
KC2.1
01/08/08
32.5
KC2.1
01/09/08
32.4
KC2.1
01/09/08
32.6
KC2.1
01/09/08
32.6
KC2.1
01/09/08
32.8
KC2.1
01/09/08
31.8
KC2.1
01/10/08
48.5
KC2.1
01/10/08
38.4
KC2.1
01/10/08
39.7
KC2.1
01/10/08
39.3
F-209

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/10/08
38.6
KC2.1
01/10/08
38.1
KC2.1
01/10/08
49.2
KC2.1
01/10/08
37.5
KC2.1
01/10/08
38.7
KC2.1
01/10/08
39.1
KC2.1
01/10/08
41.6
KC2.1
01/10/08
41.7
KC2.1
01/10/08
42.9
KC2.1
01/10/08
42.5
KC2.1
01/10/08
43
KC2.1
01/10/08
44.9
KC2.1
01/10/08
45.8
KC2.1
01/10/08
46.7
KC2.1
01/10/08
47.7
KC2.1
01/10/08
47.5
KC2.1
01/10/08
46.7
KC2.1
01/10/08
46.9
KC2.1
01/10/08
48.5
KC2.1
01/10/08
49.9
KC2.1
01/10/08
50
KC2.1
01/10/08
49.4
KC2.1
01/10/08
48.8
KC2.1
01/10/08
48
KC2.1
01/10/08
47.3
KC2.1
01/10/08
47.4
KC2.1
01/10/08
48.7
KC2.1
01/10/08
47.9
KC2.1
01/10/08
47.9
KC2.1
01/10/08
47.4
KC2.1
01/10/08
46.3
KC2.1
01/10/08
45.9
KC2.1
01/10/08
51.9
KC2.1
01/10/08
75.1
KC2.1
01/10/08
45
KC2.1
01/10/08
42.8
KC2.1
01/10/08
43.4
KC2.1
01/10/08
44.7
KC2.1
01/10/08
46
KC2.1
01/10/08
48.1
KC2.1
01/10/08
47
KC2.1
01/10/08
47.7
KC2.1
01/10/08
48
KC2.1
01/10/08
47.4
KC2.1
01/10/08
47.6
F-210

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/10/08
45.3
KC2.1
01/10/08
46.1
KC2.1
01/10/08
47.7
KC2.1
01/10/08
49.4
KC2.1
01/10/08
50.4
KC2.1
01/10/08
49.6
KC2.1
01/10/08
48.4
KC2.1
01/10/08
47.2
KC2.1
01/10/08
42.9
KC2.1
01/10/08
54.9
KC2.1
01/10/08
57.7
KC2.1
01/10/08
57.1
KC2.1
01/10/08
55.8
KC2.1
01/10/08
56.1
KC2.1
01/10/08
58.3
KC2.1
01/10/08
57.6
KC2.1
01/11/08
56.4
KC2.1
01/11/08
55.2
KC2.1
01/11/08
53.7
KC2.1
01/11/08
54.8
KC2.1
01/11/08
52.9
KC2.1
01/11/08
95.4
KC2.1
01/11/08
68
KC2.1
01/11/08
54.8
KC2.1
01/11/08
55.5
KC2.1
01/11/08
57.8
KC2.1
01/11/08
58.2
KC2.1
01/11/08
58.2
KC2.1
01/11/08
56.3
KC2.1
01/11/08
54
KC2.1
01/11/08
51.3
KC2.1
01/11/08
52.1
KC2.1
01/11/08
53.8
KC2.1
01/11/08
52.1
KC2.1
01/11/08
50.2
KC2.1
01/11/08
51.9
KC2.1
01/11/08
50.8
KC2.1
01/11/08
50.5
KC2.1
01/11/08
48.4
KC2.1
01/11/08
47.6
KC2.1
01/11/08
48.5
KC2.1
01/11/08
48
KC2.1
01/11/08
47.2
KC2.1
01/11/08
46.4
KC2.1
01/11/08
46
F-211

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/11/08
46.5
KC2.1
01/11/08
46.2
KC2.1
01/11/08
44.5
KC2.1
01/11/08
43.3
KC2.1
01/11/08
42.3
KC2.1
01/11/08
39.8
KC2.1
01/11/08
40.1
KC2.1
01/11/08
41.2
KC2.1
01/11/08
41.8
KC2.1
01/11/08
43
KC2.1
01/11/08
41.3
KC2.1
01/11/08
41.7
KC2.1
01/11/08
42.2
KC2.1
01/11/08
42.5
KC2.1
01/11/08
41.8
KC2.1
01/11/08
41.2
KC2.1
01/11/08
39.5
KC2.1
01/11/08
41
KC2.1
01/11/08
42.4
KC2.1
01/11/08
42.1
KC2.1
01/11/08
41.5
KC2.1
01/11/08
41
KC2.1
01/11/08
40.4
KC2.1
01/11/08
40.1
KC2.1
01/11/08
41.8
KC2.1
01/11/08
40.2
KC2.1
01/11/08
38.5
KC2.1
01/11/08
37.8
KC2.1
01/11/08
35.7
KC2.1
01/11/08
35.2
KC2.1
01/11/08
35.3
KC2.1
01/11/08
33.3
KC2.1
01/11/08
32.8
KC2.1
01/11/08
32.2
KC2.1
01/11/08
33.8
KC2.1
01/1 2/08
65.1
KC2.1
01/1 2/08
24.1
KC2.1
01/1 2/08
28.5
KC2.1
01/1 2/08
32.6
KC2.1
01/1 2/08
35.1
KC2.1
01/1 2/08
38.7
KC2.1
01/1 2/08
46.3
KC2.1
01/1 2/08
51.6
KC2.1
01/1 2/08
57.8
KC2.1
01/1 2/08
58.3
F-212

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/1 2/08
60.5
KC2.1
01/1 2/08
61.9
KC2.1
01/1 2/08
64.2
KC2.1
01/1 2/08
65.2
KC2.1
01/1 2/08
67.7
KC2.1
01/1 2/08
67.2
KC2.1
01/1 2/08
65.8
KC2.1
01/1 2/08
65.1
KC2.1
01/1 2/08
64.7
KC2.1
01/1 2/08
65.3
KC2.1
01/1 2/08
67.5
KC2.1
01/1 2/08
68.9
KC2.1
01/1 2/08
69.6
KC2.1
01/1 2/08
68.6
KC2.1
01/1 2/08
66.3
KC2.1
01/1 2/08
67.7
KC2.1
01/1 2/08
70.7
KC2.1
01/1 2/08
71.4
KC2.1
01/1 2/08
69.5
KC2.1
01/1 2/08
70.7
KC2.1
01/1 2/08
70.1
KC2.1
01/1 2/08
68.3
KC2.1
01/1 2/08
69.2
KC2.1
01/1 2/08
72.9
KC2.1
01/1 2/08
72.7
KC2.1
01/1 2/08
69.7
KC2.1
01/1 2/08
69.9
KC2.1
01/1 2/08
68
KC2.1
01/1 2/08
67.9
KC2.1
01/1 2/08
68.3
KC2.1
01/1 2/08
69.5
KC2.1
01/1 2/08
71.3
KC2.1
01/1 2/08
69.7
KC2.1
01/1 2/08
69.3
KC2.1
01/14/08
110.7
KC2.1
01/14/08
64.6
KC2.1
01/14/08
70.9
KC2.1
01/14/08
77.7
KC2.1
01/14/08
84.2
KC2.1
01/15/08
115.6
KC2.1
01/26/08
102.2
KC2.1
01/26/08
36.6
KC2.1
01/26/08
31.1
KC2.1
01/26/08
33.5
KC2.1
01/26/08
32.3
F-213

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/26/08
31.5
KC2.1
01/26/08
34.4
KC2.1
01/26/08
42.5
KC2.1
01/26/08
46
KC2.1
01/26/08
46.1
KC2.1
01/26/08
50.4
KC2.1
01/26/08
52.1
KC2.1
01/26/08
53.3
KC2.1
01/26/08
57.1
KC2.1
01/26/08
57.6
KC2.1
01/26/08
59
KC2.1
01/26/08
61.2
KC2.1
01/26/08
65
KC2.1
01/26/08
65.6
KC2.1
01/26/08
65
KC2.1
01/26/08
65.7
KC2.1
01/27/08
66.1
KC2.1
01/27/08
70.2
KC2.1
01/27/08
65.3
KC2.1
01/27/08
61.3
KC2.1
01/27/08
61.2
KC2.1
01/27/08
58.2
KC2.1
01/27/08
192.7
KC2.1
01/27/08
55.9
KC2.1
01/27/08
59.8
KC2.1
01/27/08
58.5
KC2.1
01/27/08
66.5
KC2.1
01/27/08
70.2
KC2.1
01/27/08
73.8
KC2.1
01/27/08
74.4
KC2.1
01/27/08
74.4
KC2.1
01/27/08
77.7
KC2.1
01/27/08
76.9
KC2.1
01/27/08
75.3
KC2.1
01/27/08
73.2
KC2.1
01/27/08
75.2
KC2.1
01/27/08
74.8
KC2.1
01/27/08
70.9
KC2.1
01/27/08
69
KC2.1
01/30/08
52
KC2.1
01/30/08
66.4
KC2.1
01/30/08
74.7
KC2.1
01/30/08
73.9
KC2.1
01/30/08
72.2
KC2.1
01/30/08
70.5
F-214

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.1
01/30/08
69.4
KC2.1
01/30/08
75.6
KC2.1
01/30/08
79.7
KC2.1
01/30/08
82.4
KC2.1
01/30/08
75.9
KC2.1
01/30/08
80.7
KC2.2
1 2/02/07
73.4
KC2.2
1 2/02/07
72.8
KC2.2
1 2/02/07
73.7
KC2.2
1 2/02/07
72.9
KC2.2
1 2/02/07
73.8
KC2.2
1 2/02/07
84.1
KC2.2
1 2/02/07
110.2
KC2.2
1 2/02/07
130.1
KC2.2
1 2/02/07
130.8
KC2.2
1 2/02/07
125.7
KC2.2
1 2/02/07
118
KC2.2
1 2/02/07
97.4
KC2.2
1 2/02/07
82.4
KC2.2
1 2/02/07
83
KC2.2
1 2/02/07
85.2
KC2.2
1 2/02/07
95.5
KC2.2
1 2/02/07
122.3
KC2.2
1 2/02/07
149.5
KC2.2
1 2/02/07
147.1
KC2.2
1 2/02/07
142.9
KC2.2
1 2/02/07
105.5
KC2.2
1 2/02/07
102.8
KC2.2
1 2/02/07
105.7
KC2.2
1 2/02/07
109.8
KC2.2
1 2/02/07
127.8
KC2.2
1 2/02/07
147.7
KC2.2
1 2/02/07
135.6
KC2.2
1 2/02/07
111.2
KC2.2
1 2/02/07
109.5
KC2.2
1 2/02/07
115.2
KC2.2
1 2/02/07
134.8
KC2.2
1 2/02/07
147.6
KC2.2
1 2/02/07
132
KC2.2
1 2/02/07
123.3
KC2.2
1 2/02/07
110.6
KC2.2
1 2/02/07
84
KC2.2
1 2/02/07
83.9
KC2.2
1 2/02/07
82.3
KC2.2
1 2/02/07
78.5
F-215

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/02/07
76.5
KC2.2
1 2/02/07
72.9
KC2.2
1 2/02/07
75.4
KC2.2
1 2/02/07
73.7
KC2.2
1 2/02/07
69.1
KC2.2
1 2/02/07
68
KC2.2
1 2/02/07
67.3
KC2.2
1 2/02/07
64.9
KC2.2
1 2/02/07
64.6
KC2.2
1 2/02/07
68.4
KC2.2
1 2/02/07
80.1
KC2.2
1 2/02/07
86.3
KC2.2
1 2/02/07
69.8
KC2.2
1 2/02/07
48.9
KC2.2
1 2/02/07
51.4
KC2.2
1 2/02/07
63
KC2.2
1 2/02/07
74.5
KC2.2
1 2/02/07
68.9
KC2.2
1 2/02/07
54.4
KC2.2
1 2/02/07
54
KC2.2
1 2/02/07
54.5
KC2.2
1 2/02/07
54.9
KC2.2
1 2/02/07
53.8
KC2.2
1 2/02/07
54.4
KC2.2
1 2/02/07
55.2
KC2.2
1 2/02/07
54.9
KC2.2
1 2/02/07
54.4
KC2.2
1 2/02/07
55
KC2.2
1 2/02/07
53.9
KC2.2
1 2/02/07
55.3
KC2.2
1 2/02/07
80.9
KC2.2
1 2/02/07
68.1
KC2.2
1 2/02/07
69.6
KC2.2
1 2/02/07
72.1
KC2.2
1 2/02/07
70.5
KC2.2
1 2/02/07
62.3
KC2.2
1 2/02/07
55.9
KC2.2
1 2/02/07
48.3
KC2.2
1 2/02/07
41.5
KC2.2
1 2/02/07
29.8
KC2.2
1 2/02/07
35.9
KC2.2
1 2/03/07
115.5
KC2.2
1 2/03/07
149.1
KC2.2
1 2/03/07
154.4
KC2.2
1 2/03/07
152.9
F-216

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/03/07
125.8
KC2.2
1 2/03/07
131.8
KC2.2
1 2/03/07
644.8
KC2.2
1 2/03/07
431.3
KC2.2
1 2/03/07
155
KC2.2
1 2/03/07
CO
CO
CO
KC2.2
1 2/03/07
84.6
KC2.2
1 2/03/07
90.1
KC2.2
1 2/03/07
114.4
KC2.2
1 2/03/07
143.4
KC2.2
1 2/03/07
150.3
KC2.2
1 2/03/07
173.7
KC2.2
1 2/03/07
184.6
KC2.2
1 2/03/07
184.3
KC2.2
1 2/03/07
198.7
KC2.2
1 2/03/07
161.9
KC2.2
1 2/03/07
86.4
KC2.2
1 2/03/07
83.5
KC2.2
1 2/03/07
95.8
KC2.2
1 2/03/07
129.1
KC2.2
1 2/03/07
148
KC2.2
1 2/03/07
147.2
KC2.2
1 2/03/07
126.2
KC2.2
1 2/03/07
95.3
KC2.2
1 2/03/07
114.4
KC2.2
1 2/03/07
138.7
KC2.2
1 2/03/07
113.8
KC2.2
1 2/03/07
107.4
KC2.2
1 2/03/07
136.9
KC2.2
1 2/03/07
122.7
KC2.2
1 2/03/07
102.8
KC2.2
1 2/03/07
135.3
KC2.2
1 2/03/07
167.3
KC2.2
1 2/03/07
165.2
KC2.2
1 2/03/07
154.5
KC2.2
1 2/03/07
112.8
KC2.2
1 2/03/07
119.5
KC2.2
1 2/03/07
169.5
KC2.2
1 2/03/07
163.7
KC2.2
1 2/03/07
119.6
KC2.2
1 2/03/07
117.8
KC2.2
1 2/03/07
159.8
KC2.2
1 2/03/07
179.2
KC2.2
1 2/03/07
156.3
KC2.2
1 2/03/07
141
F-217

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/03/07
171.1
KC2.2
1 2/03/07
196.9
KC2.2
1 2/03/07
168.9
KC2.2
1 2/03/07
154.2
KC2.2
1 2/03/07
170.5
KC2.2
1 2/03/07
192.6
KC2.2
1 2/03/07
220.6
KC2.2
1 2/03/07
230.4
KC2.2
1 2/03/07
197
KC2.2
1 2/03/07
149.9
KC2.2
1 2/03/07
150.5
KC2.2
1 2/03/07
148
KC2.2
1 2/03/07
150.7
KC2.2
1 2/03/07
159
KC2.2
1 2/03/07
151.5
KC2.2
1 2/03/07
156.5
KC2.2
1 2/03/07
162.9
KC2.2
1 2/03/07
158
KC2.2
1 2/03/07
162.9
KC2.2
1 2/03/07
157.4
KC2.2
1 2/03/07
161.1
KC2.2
1 2/03/07
149
KC2.2
1 2/03/07
146.7
KC2.2
1 2/03/07
150.2
KC2.2
1 2/03/07
137.3
KC2.2
1 2/03/07
122.7
KC2.2
1 2/03/07
119.6
KC2.2
1 2/03/07
116.6
KC2.2
1 2/03/07
123.9
KC2.2
1 2/03/07
124.5
KC2.2
1 2/03/07
119.4
KC2.2
1 2/03/07
131.9
KC2.2
1 2/03/07
188.5
KC2.2
1 2/03/07
259.4
KC2.2
1 2/03/07
307.4
KC2.2
1 2/03/07
238.9
KC2.2
1 2/03/07
152.7
KC2.2
1 2/03/07
128.3
KC2.2
1 2/03/07
94.6
KC2.2
1 2/03/07
57.7
KC2.2
1 2/03/07
75.7
KC2.2
1 2/04/07
141.3
KC2.2
1 2/04/07
148.8
KC2.2
1 2/04/07
149.9
KC2.2
1 2/04/07
124.6
F-218

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/04/07
111.5
KC2.2
1 2/04/07
116.4
KC2.2
1 2/04/07
133
KC2.2
1 2/04/07
166.2
KC2.2
1 2/04/07
161.5
KC2.2
1 2/04/07
131
KC2.2
1 2/04/07
116.2
KC2.2
1 2/04/07
107.8
KC2.2
1 2/04/07
106.3
KC2.2
1 2/04/07
115
KC2.2
1 2/04/07
140.1
KC2.2
1 2/04/07
132.8
KC2.2
1 2/04/07
118.6
KC2.2
1 2/04/07
118.7
KC2.2
1 2/04/07
118.1
KC2.2
1 2/04/07
112.5
KC2.2
1 2/04/07
105.7
KC2.2
1 2/04/07
101.4
KC2.2
1 2/04/07
109.2
KC2.2
1 2/04/07
121.9
KC2.2
1 2/04/07
155.7
KC2.2
1 2/04/07
162.8
KC2.2
1 2/04/07
164.5
KC2.2
1 2/04/07
137.5
KC2.2
1 2/04/07
118.5
KC2.2
1 2/04/07
118.7
KC2.2
1 2/04/07
128.1
KC2.2
1 2/04/07
160.6
KC2.2
1 2/04/07
166.5
KC2.2
1 2/04/07
149.1
KC2.2
1 2/04/07
129.7
KC2.2
1 2/04/07
139.4
KC2.2
1 2/04/07
162.6
KC2.2
1 2/04/07
175.2
KC2.2
1 2/04/07
145
KC2.2
1 2/04/07
134.4
KC2.2
1 2/04/07
132.7
KC2.2
1 2/04/07
130
KC2.2
1 2/04/07
128.9
KC2.2
1 2/04/07
145.3
KC2.2
1 2/04/07
162.6
KC2.2
1 2/04/07
156.7
KC2.2
1 2/04/07
158.1
KC2.2
1 2/04/07
162.4
KC2.2
1 2/04/07
165.4
F-219

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/04/07
159.2
KC2.2
1 2/04/07
128.4
KC2.2
1 2/04/07
95.6
KC2.2
1 2/04/07
92.7
KC2.2
1 2/04/07
98.6
KC2.2
1 2/04/07
125.2
KC2.2
1 2/04/07
150.2
KC2.2
1 2/04/07
145.5
KC2.2
1 2/04/07
140.7
KC2.2
1 2/04/07
130.7
KC2.2
1 2/04/07
108
KC2.2
1 2/04/07
114.6
KC2.2
1 2/04/07
149.8
KC2.2
1 2/04/07
167
KC2.2
1 2/04/07
164.6
KC2.2
1 2/04/07
154.8
KC2.2
1 2/04/07
131.5
KC2.2
1 2/04/07
90.9
KC2.2
1 2/04/07
87.7
KC2.2
1 2/04/07
102.8
KC2.2
1 2/04/07
134.3
KC2.2
1 2/04/07
152.7
KC2.2
1 2/04/07
153.3
KC2.2
1 2/04/07
133
KC2.2
1 2/04/07
101.4
KC2.2
1 2/04/07
91.9
KC2.2
1 2/04/07
92
KC2.2
1 2/04/07
110
KC2.2
1 2/04/07
133.1
KC2.2
1 2/04/07
143.2
KC2.2
1 2/04/07
139.5
KC2.2
1 2/04/07
122
KC2.2
1 2/04/07
87.4
KC2.2
1 2/04/07
77.4
KC2.2
1 2/04/07
95.4
KC2.2
1 2/04/07
122.8
KC2.2
1 2/04/07
136.9
KC2.2
1 2/04/07
119.9
KC2.2
1 2/04/07
86.1
KC2.2
1 2/04/07
43
KC2.2
1 2/04/07
90.9
KC2.2
1 2/05/07
148.6
KC2.2
1 2/05/07
136.3
KC2.2
1 2/05/07
99.3
KC2.2
1 2/05/07
92.5
F-220

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/05/07
84
KC2.2
1 2/05/07
87.4
KC2.2
1 2/05/07
114.1
KC2.2
1 2/05/07
125.2
KC2.2
1 2/05/07
128.5
KC2.2
1 2/05/07
124.5
KC2.2
1 2/05/07
103
KC2.2
1 2/05/07
93.8
KC2.2
1 2/05/07
87.8
KC2.2
1 2/05/07
100.8
KC2.2
1 2/05/07
124
KC2.2
1 2/05/07
130.5
KC2.2
1 2/05/07
131.8
KC2.2
1 2/05/07
102
KC2.2
1 2/05/07
103.1
KC2.2
1 2/05/07
98.9
KC2.2
1 2/05/07
97.1
KC2.2
1 2/05/07
104.4
KC2.2
1 2/05/07
113.1
KC2.2
1 2/05/07
103.1
KC2.2
1 2/05/07
87
KC2.2
1 2/05/07
85.7
KC2.2
1 2/05/07
108
KC2.2
1 2/05/07
131.9
KC2.2
1 2/05/07
136.9
KC2.2
1 2/05/07
129.1
KC2.2
1 2/05/07
98.9
KC2.2
1 2/05/07
92
KC2.2
1 2/05/07
94.1
KC2.2
1 2/05/07
93.6
KC2.2
1 2/05/07
111.8
KC2.2
1 2/05/07
137.2
KC2.2
1 2/05/07
139
KC2.2
1 2/05/07
127.3
KC2.2
1 2/05/07
103.9
KC2.2
1 2/05/07
104.2
KC2.2
1 2/05/07
96.6
KC2.2
1 2/05/07
104.6
KC2.2
1 2/05/07
134.3
KC2.2
1 2/05/07
139.9
KC2.2
1 2/05/07
132.1
KC2.2
1 2/05/07
104.1
KC2.2
1 2/05/07
101.2
KC2.2
1 2/05/07
102.5
KC2.2
1 2/05/07
113.4
F-221

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/05/07
137
KC2.2
1 2/05/07
130.6
KC2.2
1 2/05/07
104.3
KC2.2
1 2/05/07
98.8
KC2.2
1 2/05/07
118.3
KC2.2
1 2/05/07
116.6
KC2.2
1 2/05/07
110.3
KC2.2
1 2/05/07
133.3
KC2.2
1 2/05/07
146.3
KC2.2
1 2/05/07
135.7
KC2.2
1 2/05/07
104.3
KC2.2
1 2/05/07
93.1
KC2.2
1 2/05/07
92
KC2.2
1 2/05/07
97.1
KC2.2
1 2/05/07
117.9
KC2.2
1 2/05/07
136.8
KC2.2
1 2/05/07
141.4
KC2.2
1 2/05/07
140.6
KC2.2
1 2/05/07
107.8
KC2.2
1 2/05/07
96.6
KC2.2
1 2/05/07
94
KC2.2
1 2/05/07
106.5
KC2.2
1 2/05/07
129.3
KC2.2
1 2/05/07
134.5
KC2.2
1 2/05/07
118.9
KC2.2
1 2/05/07
102.1
KC2.2
1 2/05/07
102
KC2.2
1 2/05/07
125.2
KC2.2
1 2/05/07
147.5
KC2.2
1 2/05/07
144.2
KC2.2
1 2/05/07
115
KC2.2
1 2/05/07
106.1
KC2.2
1 2/05/07
97.8
KC2.2
1 2/05/07
97.8
KC2.2
1 2/05/07
108.4
KC2.2
1 2/05/07
137.2
KC2.2
1 2/05/07
146.1
KC2.2
1 2/05/07
143.3
KC2.2
1 2/05/07
115.2
KC2.2
1 2/05/07
81.7
KC2.2
1 2/05/07
61.1
KC2.2
1 2/05/07
3.4
KC2.2
1 2/05/07
3.6
KC2.2
1 2/05/07
109.8
KC2.2
1 2/06/07
101.1
F-222

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/06/07
99.3
KC2.2
1 2/06/07
92.4
KC2.2
1 2/06/07
94.4
KC2.2
1 2/06/07
104.3
KC2.2
1 2/06/07
140.8
KC2.2
1 2/06/07
155.4
KC2.2
1 2/06/07
150.4
KC2.2
1 2/06/07
146.4
KC2.2
1 2/06/07
114.2
KC2.2
1 2/06/07
95.9
KC2.2
1 2/06/07
86.1
KC2.2
1 2/06/07
84.6
KC2.2
1 2/06/07
84.6
KC2.2
1 2/06/07
85.5
KC2.2
1 2/06/07
80
KC2.2
1 2/06/07
78.9
KC2.2
1 2/06/07
77.1
KC2.2
1 2/06/07
91.3
KC2.2
1 2/06/07
114.5
KC2.2
1 2/06/07
117
KC2.2
1 2/06/07
109.9
KC2.2
1 2/06/07
96.1
KC2.2
1 2/06/07
82.2
KC2.2
1 2/06/07
76.1
KC2.2
1 2/06/07
94.1
KC2.2
1 2/06/07
111.3
KC2.2
1 2/06/07
112.6
KC2.2
1 2/06/07
115.2
KC2.2
1 2/06/07
115
KC2.2
1 2/06/07
97.9
KC2.2
1 2/06/07
72.9
KC2.2
1 2/06/07
75.7
KC2.2
1 2/06/07
85.4
KC2.2
1 2/06/07
108.2
KC2.2
1 2/06/07
116.4
KC2.2
1 2/06/07
120.2
KC2.2
1 2/06/07
125.5
KC2.2
1 2/06/07
120.2
KC2.2
1 2/06/07
109.6
KC2.2
1 2/06/07
104.8
KC2.2
1 2/06/07
80.6
KC2.2
1 2/06/07
73
KC2.2
1 2/06/07
79.4
KC2.2
1 2/06/07
99.6
KC2.2
1 2/06/07
109.6
F-223

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/06/07
109.1
KC2.2
1 2/06/07
104.6
KC2.2
1 2/06/07
95.4
KC2.2
1 2/06/07
73
KC2.2
1 2/06/07
73.9
KC2.2
1 2/06/07
93.7
KC2.2
1 2/06/07
112.6
KC2.2
1 2/06/07
120.4
KC2.2
1 2/06/07
130
KC2.2
1 2/06/07
142.7
KC2.2
1 2/06/07
144
KC2.2
1 2/06/07
96.7
KC2.2
1 2/06/07
79.5
KC2.2
1 2/06/07
73.8
KC2.2
1 2/06/07
77.5
KC2.2
1 2/06/07
97.4
KC2.2
1 2/06/07
112.8
KC2.2
1 2/06/07
118
KC2.2
1 2/06/07
101.2
KC2.2
1 2/06/07
80.1
KC2.2
1 2/06/07
73.8
KC2.2
1 2/06/07
82.6
KC2.2
1 2/06/07
104.5
KC2.2
1 2/06/07
120.8
KC2.2
1 2/06/07
102.6
KC2.2
1 2/06/07
81.7
KC2.2
1 2/06/07
74.9
KC2.2
1 2/06/07
80.6
KC2.2
1 2/06/07
101.8
KC2.2
1 2/06/07
123.6
KC2.2
1 2/06/07
130.8
KC2.2
1 2/06/07
129.6
KC2.2
1 2/06/07
109
KC2.2
1 2/06/07
83.5
KC2.2
1 2/06/07
76.4
KC2.2
1 2/06/07
84.5
KC2.2
1 2/06/07
120.2
KC2.2
1 2/06/07
132
KC2.2
1 2/06/07
154.8
KC2.2
1 2/06/07
175.3
KC2.2
1 2/06/07
139.7
KC2.2
1 2/06/07
85.7
KC2.2
1 2/06/07
64.3
KC2.2
1 2/06/07
40.4
KC2.2
1 2/06/07
47.5
F-224

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/06/07
150.7
KC2.2
1 2/07/07
77.9
KC2.2
1 2/07/07
77.7
KC2.2
1 2/07/07
77.1
KC2.2
1 2/07/07
75.3
KC2.2
1 2/07/07
77.9
KC2.2
1 2/07/07
80.6
KC2.2
1 2/07/07
86.3
KC2.2
1 2/07/07
91.3
KC2.2
1 2/07/07
74.2
KC2.2
1 2/07/07
51
KC2.2
1 2/07/07
69
KC2.2
1 2/07/07
131.2
KC2.2
1 2/07/07
232.2
KC2.2
1 2/07/07
369.7
KC2.2
1 2/07/07
198.1
KC2.2
1 2/07/07
54
KC2.2
1 2/07/07
51.5
KC2.2
1 2/07/07
60.5
KC2.2
1 2/07/07
70.8
KC2.2
1 2/07/07
71.4
KC2.2
1 2/07/07
73.1
KC2.2
1 2/07/07
79.4
KC2.2
1 2/07/07
97
KC2.2
1 2/07/07
122.6
KC2.2
1 2/07/07
116.6
KC2.2
1 2/07/07
88.4
KC2.2
1 2/07/07
87.9
KC2.2
1 2/07/07
93.7
KC2.2
1 2/07/07
114.3
KC2.2
1 2/07/07
138.8
KC2.2
1 2/07/07
98
KC2.2
1 2/07/07
82
KC2.2
1 2/07/07
84.6
KC2.2
1 2/07/07
96.4
KC2.2
1 2/07/07
126.2
KC2.2
1 2/07/07
121.2
KC2.2
1 2/07/07
96
KC2.2
1 2/07/07
84.5
KC2.2
1 2/07/07
84.4
KC2.2
1 2/07/07
89.4
KC2.2
1 2/07/07
99
KC2.2
1 2/07/07
114.8
KC2.2
1 2/07/07
105.3
KC2.2
1 2/07/07
89.7
F-225

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/07/07
94.8
KC2.2
1 2/07/07
106.1
KC2.2
1 2/07/07
123.9
KC2.2
1 2/07/07
123.8
KC2.2
1 2/07/07
110.4
KC2.2
1 2/07/07
91.1
KC2.2
1 2/07/07
88.5
KC2.2
1 2/07/07
91.4
KC2.2
1 2/07/07
102.4
KC2.2
1 2/07/07
121.8
KC2.2
1 2/07/07
118.2
KC2.2
1 2/07/07
103.1
KC2.2
1 2/07/07
99.9
KC2.2
1 2/07/07
100.6
KC2.2
1 2/07/07
104.8
KC2.2
1 2/07/07
122.1
KC2.2
1 2/07/07
118.1
KC2.2
1 2/07/07
108.5
KC2.2
1 2/07/07
101
KC2.2
1 2/07/07
100.3
KC2.2
1 2/07/07
113.3
KC2.2
1 2/07/07
142.5
KC2.2
1 2/07/07
174.6
KC2.2
1 2/07/07
215.8
KC2.2
1 2/07/07
206.3
KC2.2
1 2/07/07
380.4
KC2.2
1 2/07/07
217.9
KC2.2
1 2/07/07
49.2
KC2.2
1 2/07/07
57.9
KC2.2
1 2/07/07
86.2
KC2.2
1 2/07/07
131.6
KC2.2
1 2/07/07
132.4
KC2.2
1 2/07/07
138.7
KC2.2
1 2/07/07
142.4
KC2.2
1 2/07/07
140.7
KC2.2
1 2/07/07
144.7
KC2.2
1 2/07/07
149.4
KC2.2
1 2/07/07
152
KC2.2
1 2/07/07
152.9
KC2.2
1 2/07/07
167.6
KC2.2
1 2/07/07
164.3
KC2.2
1 2/07/07
144
KC2.2
1 2/07/07
127
KC2.2
1 2/07/07
120.1
KC2.2
1 2/07/07
93.3
F-226

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/07/07
56.4
KC2.2
1 2/07/07
85
KC2.2
1 2/07/07
96.4
KC2.2
1 2/07/07
97.8
KC2.2
1 2/08/07
76.9
KC2.2
1 2/08/07
96.3
KC2.2
1 2/08/07
100.7
KC2.2
1 2/08/07
90.6
KC2.2
1 2/08/07
89.1
KC2.2
1 2/08/07
84.9
KC2.2
1 2/08/07
87.5
KC2.2
1 2/08/07
53.6
KC2.2
1 2/08/07
61.2
KC2.2
1 2/08/07
73.2
KC2.2
1 2/08/07
84.4
KC2.2
1 2/08/07
89.8
KC2.2
1 2/08/07
89.1
KC2.2
1 2/08/07
89.2
KC2.2
1 2/08/07
89.3
KC2.2
1 2/08/07
90.9
KC2.2
1 2/08/07
96.5
KC2.2
1 2/08/07
94.1
KC2.2
1 2/08/07
94.5
KC2.2
1 2/08/07
108.6
KC2.2
1 2/08/07
112.8
KC2.2
1 2/08/07
120.7
KC2.2
1 2/08/07
75.6
KC2.2
1 2/08/07
70.2
KC2.2
1 2/08/07
85.5
KC2.2
1 2/08/07
93
KC2.2
1 2/08/07
91.7
KC2.2
1 2/08/07
92
KC2.2
1 2/08/07
95.5
KC2.2
1 2/08/07
98.1
KC2.2
1 2/08/07
99.3
KC2.2
1 2/08/07
99
KC2.2
1 2/08/07
92.9
KC2.2
1 2/08/07
81.4
KC2.2
1 2/08/07
71.7
KC2.2
1 2/08/07
64.1
KC2.2
1 2/08/07
64.2
KC2.2
1 2/08/07
74.9
KC2.2
1 2/08/07
80.6
KC2.2
1 2/08/07
83.3
KC2.2
1 2/08/07
84.6
F-227

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/08/07
86
KC2.2
1 2/08/07
83.5
KC2.2
1 2/08/07
84.1
KC2.2
1 2/08/07
85.2
KC2.2
1 2/08/07
81.9
KC2.2
1 2/08/07
80.5
KC2.2
1 2/08/07
74.9
KC2.2
1 2/08/07
66.9
KC2.2
1 2/08/07
65.4
KC2.2
1 2/08/07
77.8
KC2.2
1 2/08/07
83.7
KC2.2
1 2/08/07
86.3
KC2.2
1 2/08/07
86.1
KC2.2
1 2/08/07
84.5
KC2.2
1 2/08/07
84.3
KC2.2
1 2/08/07
90.4
KC2.2
1 2/08/07
86.8
KC2.2
1 2/08/07
69.8
KC2.2
1 2/08/07
59
KC2.2
1 2/08/07
66.4
KC2.2
1 2/08/07
77.6
KC2.2
1 2/08/07
83.1
KC2.2
1 2/08/07
86.3
KC2.2
1 2/08/07
92.4
KC2.2
1 2/08/07
106.3
KC2.2
1 2/08/07
115.3
KC2.2
1 2/08/07
95.7
KC2.2
1 2/08/07
76
KC2.2
1 2/08/07
64.8
KC2.2
1 2/08/07
67.4
KC2.2
1 2/08/07
78.6
KC2.2
1 2/08/07
82.8
KC2.2
1 2/08/07
85.9
KC2.2
1 2/08/07
85
KC2.2
1 2/08/07
85.7
KC2.2
1 2/08/07
87
KC2.2
1 2/08/07
86.5
KC2.2
1 2/08/07
89.5
KC2.2
1 2/08/07
85.6
KC2.2
1 2/08/07
83.2
KC2.2
1 2/08/07
77.6
KC2.2
1 2/08/07
72
KC2.2
1 2/08/07
64
KC2.2
1 2/08/07
54.7
KC2.2
1 2/08/07
47.8
F-228

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/08/07
37.7
KC2.2
1 2/08/07
56.6
KC2.2
1 2/08/07
77
KC2.2
1 2/09/07
62.4
KC2.2
1 2/09/07
68.9
KC2.2
1 2/09/07
70.1
KC2.2
1 2/09/07
63
KC2.2
1 2/09/07
55.8
KC2.2
1 2/09/07
53
KC2.2
1 2/09/07
52.3
KC2.2
1 2/09/07
52.9
KC2.2
1 2/09/07
55.6
KC2.2
1 2/09/07
57.4
KC2.2
1 2/09/07
57.1
KC2.2
1 2/09/07
60.1
KC2.2
1 2/09/07
63.2
KC2.2
1 2/09/07
66.2
KC2.2
1 2/09/07
66
KC2.2
1 2/09/07
67.1
KC2.2
1 2/09/07
70.4
KC2.2
1 2/09/07
69.9
KC2.2
1 2/09/07
71.5
KC2.2
1 2/09/07
75.3
KC2.2
1 2/09/07
67
KC2.2
1 2/09/07
67.6
KC2.2
1 2/09/07
72.2
KC2.2
1 2/09/07
77.1
KC2.2
1 2/09/07
82.3
KC2.2
1 2/09/07
87.4
KC2.2
1 2/09/07
97.1
KC2.2
1 2/09/07
105.6
KC2.2
1 2/09/07
109.4
KC2.2
1 2/09/07
111.7
KC2.2
1 2/09/07
114.6
KC2.2
1 2/09/07
113.1
KC2.2
1 2/09/07
101.7
KC2.2
1 2/09/07
92.4
KC2.2
1 2/09/07
87.3
KC2.2
1 2/09/07
115.8
KC2.2
1 2/09/07
121.4
KC2.2
1 2/09/07
113.2
KC2.2
1 2/09/07
110.1
KC2.2
1 2/09/07
104.4
KC2.2
1 2/09/07
89.9
KC2.2
1 2/09/07
72.9
F-229

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/09/07
80.4
KC2.2
1 2/09/07
97
KC2.2
1 2/09/07
91.5
KC2.2
1 2/09/07
74.1
KC2.2
1 2/09/07
61.1
KC2.2
1 2/09/07
47.9
KC2.2
1 2/09/07
70.9
KC2.2
1 2/09/07
75
KC2.2
1 2/10/07
27.6
KC2.2
1 2/10/07
32
KC2.2
1 2/10/07
33
KC2.2
1 2/10/07
33
KC2.2
1 2/10/07
35.8
KC2.2
1 2/10/07
36.2
KC2.2
1 2/10/07
37
KC2.2
1 2/10/07
40.2
KC2.2
1 2/10/07
39.4
KC2.2
1 2/10/07
38.9
KC2.2
1 2/10/07
41.4
KC2.2
1 2/10/07
38.9
KC2.2
1 2/10/07
39.3
KC2.2
1 2/10/07
42
KC2.2
1 2/10/07
40.3
KC2.2
1 2/10/07
40.7
KC2.2
1 2/10/07
42.5
KC2.2
1 2/10/07
41
KC2.2
1 2/10/07
41
KC2.2
1 2/10/07
38.6
KC2.2
1 2/10/07
35.5
KC2.2
1 2/10/07
40.8
KC2.2
1 2/10/07
46
KC2.2
1 2/10/07
48.8
KC2.2
1 2/10/07
52.5
KC2.2
1 2/10/07
53.8
KC2.2
1 2/10/07
54.8
KC2.2
1 2/10/07
56.7
KC2.2
1 2/10/07
56.8
KC2.2
1 2/10/07
63.6
KC2.2
1 2/10/07
72.3
KC2.2
1 2/10/07
73.3
KC2.2
1 2/10/07
77.6
KC2.2
1 2/10/07
80.6
KC2.2
1 2/10/07
81.4
KC2.2
1 2/10/07
81.6
KC2.2
1 2/10/07
79.5
F-230

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/10/07
73.1
KC2.2
1 2/10/07
68
KC2.2
1 2/10/07
62.3
KC2.2
1 2/10/07
66
KC2.2
1 2/10/07
76.7
KC2.2
1 2/10/07
73.1
KC2.2
1 2/10/07
69.4
KC2.2
1 2/10/07
60.9
KC2.2
1 2/10/07
59
KC2.2
1 2/10/07
68.7
KC2.2
1 2/10/07
79.4
KC2.2
1 2/10/07
77.8
KC2.2
1 2/10/07
76.6
KC2.2
1 2/15/07
53.6
KC2.2
1 2/15/07
54.3
KC2.2
1 2/15/07
56
KC2.2
1 2/15/07
55.2
KC2.2
1 2/15/07
55.9
KC2.2
1 2/15/07
57.3
KC2.2
1 2/15/07
56.5
KC2.2
1 2/15/07
56.9
KC2.2
1 2/15/07
58.7
KC2.2
1 2/15/07
59.5
KC2.2
1 2/15/07
61.7
KC2.2
1 2/15/07
66.2
KC2.2
1 2/15/07
67.2
KC2.2
1 2/15/07
67.9
KC2.2
1 2/15/07
66.9
KC2.2
1 2/15/07
65.8
KC2.2
1 2/15/07
64.5
KC2.2
1 2/15/07
60.9
KC2.2
1 2/15/07
57.7
KC2.2
1 2/15/07
53.2
KC2.2
1 2/15/07
45.2
KC2.2
1 2/15/07
37
KC2.2
1 2/15/07
30.3
KC2.2
1 2/15/07
24.9
KC2.2
1 2/15/07
63.7
KC2.2
1 2/1 7/07
49.2
KC2.2
1 2/1 7/07
51.8
KC2.2
1 2/1 7/07
51
KC2.2
1 2/1 7/07
51.2
KC2.2
1 2/1 7/07
54.3
KC2.2
1 2/1 7/07
52.7
KC2.2
1 2/1 7/07
52.7
F-231

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/1 7/07
56.5
KC2.2
1 2/1 7/07
55.1
KC2.2
1 2/1 7/07
54.9
KC2.2
1 2/1 7/07
57.9
KC2.2
1 2/1 7/07
56.2
KC2.2
1 2/1 7/07
56
KC2.2
1 2/1 7/07
59.3
KC2.2
1 2/1 7/07
57.2
KC2.2
1 2/1 7/07
55.8
KC2.2
1 2/1 7/07
57.9
KC2.2
1 2/1 7/07
55
KC2.2
1 2/1 7/07
54.1
KC2.2
1 2/1 7/07
53.2
KC2.2
1 2/1 7/07
48.2
KC2.2
1 2/1 7/07
45.1
KC2.2
1 2/1 7/07
49.5
KC2.2
1 2/1 7/07
55.8
KC2.2
1 2/1 7/07
57.4
KC2.2
1 2/1 7/07
59.3
KC2.2
1 2/1 7/07
58.1
KC2.2
1 2/1 7/07
57.3
KC2.2
1 2/1 7/07
60.6
KC2.2
1 2/1 7/07
61.3
KC2.2
1 2/1 7/07
61.7
KC2.2
1 2/1 7/07
64.9
KC2.2
1 2/1 7/07
66.1
KC2.2
1 2/1 7/07
68.1
KC2.2
1 2/1 7/07
70.3
KC2.2
1 2/1 7/07
72.3
KC2.2
1 2/1 7/07
71.5
KC2.2
1 2/1 7/07
72.4
KC2.2
1 2/1 7/07
76.4
KC2.2
1 2/1 7/07
84.7
KC2.2
1 2/1 7/07
83.1
KC2.2
1 2/1 7/07
73.3
KC2.2
1 2/1 7/07
48.8
KC2.2
1 2/1 7/07
56.7
KC2.2
1 2/1 7/07
65.1
KC2.2
1 2/1 7/07
71.9
KC2.2
1 2/1 7/07
71.2
KC2.2
1 2/1 7/07
69.6
KC2.2
1 2/1 7/07
66.3
KC2.2
1 2/1 7/07
60.2
KC2.2
1 2/1 7/07
52.6
KC2.2
1 2/1 7/07
43.9
F-232

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/1 7/07
37.6
KC2.2
1 2/1 7/07
33.9
KC2.2
1 2/1 7/07
13.4
KC2.2
1 2/1 7/07
62.9
KC2.2
1 2/18/07
79.1
KC2.2
1 2/18/07
78.6
KC2.2
1 2/18/07
91
KC2.2
1 2/18/07
109.6
KC2.2
1 2/18/07
117.5
KC2.2
1 2/18/07
118.8
KC2.2
1 2/18/07
119
KC2.2
1 2/18/07
113.2
KC2.2
1 2/18/07
113.4
KC2.2
1 2/18/07
125.9
KC2.2
1 2/18/07
142
KC2.2
1 2/18/07
149.9
KC2.2
1 2/18/07
178.7
KC2.2
1 2/18/07
202.7
KC2.2
1 2/18/07
197
KC2.2
1 2/18/07
184.6
KC2.2
1 2/18/07
168.3
KC2.2
1 2/18/07
150.2
KC2.2
1 2/18/07
144
KC2.2
1 2/18/07
149.8
KC2.2
1 2/18/07
158.9
KC2.2
1 2/18/07
175.8
KC2.2
1 2/18/07
169.3
KC2.2
1 2/18/07
158.5
KC2.2
1 2/18/07
144
KC2.2
1 2/18/07
124.8
KC2.2
1 2/18/07
106.7
KC2.2
1 2/18/07
87
KC2.2
1 2/18/07
63.6
KC2.2
1 2/18/07
45.7
KC2.2
1 2/18/07
32.6
KC2.2
1 2/18/07
17.6
KC2.2
1 2/18/07
48.6
KC2.2
1 2/18/07
53.7
KC2.2
1 2/18/07
53.3
KC2.2
1 2/18/07
48.7
KC2.2
1 2/18/07
48.5
KC2.2
1 2/18/07
43.4
KC2.2
1 2/18/07
36.5
KC2.2
1 2/18/07
43.4
KC2.2
1 2/18/07
45.1
F-233

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/18/07
45.8
KC2.2
1 2/18/07
48.7
KC2.2
1 2/18/07
46.6
KC2.2
1 2/18/07
47.5
KC2.2
1 2/18/07
49.3
KC2.2
1 2/18/07
46.5
KC2.2
1 2/18/07
45.1
KC2.2
1 2/18/07
43.3
KC2.2
1 2/18/07
38.1
KC2.2
1 2/18/07
34.5
KC2.2
1 2/18/07
30.3
KC2.2
1 2/18/07
37.7
KC2.2
1 2/18/07
50.9
KC2.2
1 2/19/07
81.2
KC2.2
1 2/19/07
109.2
KC2.2
1 2/19/07
175.2
KC2.2
1 2/19/07
220.8
KC2.2
1 2/19/07
200.9
KC2.2
1 2/19/07
120.7
KC2.2
1 2/19/07
87
KC2.2
1 2/19/07
92.9
KC2.2
1 2/19/07
91.4
KC2.2
1 2/19/07
94.4
KC2.2
1 2/19/07
168.3
KC2.2
1 2/19/07
239.8
KC2.2
1 2/19/07
246.3
KC2.2
1 2/19/07
206
KC2.2
1 2/19/07
150.3
KC2.2
1 2/19/07
141.1
KC2.2
1 2/19/07
150.5
KC2.2
1 2/19/07
133.6
KC2.2
1 2/19/07
124
KC2.2
1 2/19/07
115.7
KC2.2
1 2/19/07
105.5
KC2.2
1 2/19/07
107.2
KC2.2
1 2/19/07
105.6
KC2.2
1 2/19/07
104.1
KC2.2
1 2/19/07
107.5
KC2.2
1 2/19/07
116.8
KC2.2
1 2/19/07
121.7
KC2.2
1 2/19/07
145.4
KC2.2
1 2/19/07
175.8
KC2.2
1 2/19/07
194.3
KC2.2
1 2/19/07
156.5
KC2.2
1 2/19/07
127
F-234

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/19/07
106.8
KC2.2
1 2/19/07
107.6
KC2.2
1 2/19/07
108.1
KC2.2
1 2/19/07
103.2
KC2.2
1 2/19/07
100.6
KC2.2
1 2/19/07
110.3
KC2.2
1 2/19/07
122.1
KC2.2
1 2/19/07
140.6
KC2.2
1 2/19/07
157.1
KC2.2
1 2/19/07
145.4
KC2.2
1 2/19/07
155.1
KC2.2
1 2/19/07
174.2
KC2.2
1 2/19/07
168.8
KC2.2
1 2/19/07
122.6
KC2.2
1 2/19/07
91.5
KC2.2
1 2/19/07
91.3
KC2.2
1 2/19/07
95.5
KC2.2
1 2/19/07
97.8
KC2.2
1 2/19/07
101.5
KC2.2
1 2/19/07
108.7
KC2.2
1 2/19/07
109
KC2.2
1 2/19/07
117.9
KC2.2
1 2/19/07
130.3
KC2.2
1 2/19/07
156
KC2.2
1 2/19/07
153.6
KC2.2
1 2/19/07
117.1
KC2.2
1 2/20/07
97.9
KC2.2
1 2/20/07
98.8
KC2.2
1 2/20/07
102.8
KC2.2
1 2/20/07
106.8
KC2.2
1 2/20/07
104.5
KC2.2
1 2/20/07
93.6
KC2.2
1 2/20/07
80.9
KC2.2
1 2/20/07
77.2
KC2.2
1 2/20/07
72.4
KC2.2
1 2/20/07
71
KC2.2
1 2/20/07
68.5
KC2.2
1 2/20/07
70.3
KC2.2
1 2/20/07
73.1
KC2.2
1 2/20/07
78.3
KC2.2
1 2/20/07
80.1
KC2.2
1 2/20/07
83.5
KC2.2
1 2/20/07
98.3
KC2.2
1 2/20/07
129.9
KC2.2
1 2/20/07
142.8
F-235

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/20/07
104.9
KC2.2
1 2/20/07
79.1
KC2.2
1 2/20/07
76
KC2.2
1 2/20/07
78.2
KC2.2
1 2/20/07
73
KC2.2
1 2/20/07
68
KC2.2
1 2/20/07
71.3
KC2.2
1 2/20/07
73.4
KC2.2
1 2/20/07
74.4
KC2.2
1 2/20/07
76
KC2.2
1 2/20/07
76.2
KC2.2
1 2/20/07
83.2
KC2.2
1 2/20/07
101.2
KC2.2
1 2/20/07
123.4
KC2.2
1 2/20/07
111.2
KC2.2
1 2/20/07
69.3
KC2.2
1 2/20/07
125.9
KC2.2
1 2/20/07
164.4
KC2.2
1 2/20/07
168.7
KC2.2
1 2/20/07
134.5
KC2.2
1 2/20/07
58.1
KC2.2
1 2/20/07
100.5
KC2.2
1 2/20/07
157.5
KC2.2
1 2/20/07
172.5
KC2.2
1 2/20/07
137.9
KC2.2
1 2/20/07
92.9
KC2.2
1 2/20/07
154.3
KC2.2
1 2/20/07
192.6
KC2.2
1 2/20/07
171.7
KC2.2
1 2/20/07
127.4
KC2.2
1 2/20/07
122.3
KC2.2
1 2/20/07
123.5
KC2.2
1 2/20/07
118
KC2.2
1 2/20/07
110.4
KC2.2
1 2/20/07
112
KC2.2
1 2/20/07
113.3
KC2.2
1 2/20/07
116.5
KC2.2
1 2/20/07
115.2
KC2.2
1 2/20/07
114.1
KC2.2
1 2/20/07
114.9
KC2.2
1 2/20/07
122
KC2.2
1 2/20/07
121.2
KC2.2
1 2/20/07
129
KC2.2
1 2/20/07
143.5
KC2.2
1 2/20/07
134.6
F-236

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/20/07
90.8
KC2.2
1 2/20/07
103.2
KC2.2
1 2/20/07
108.2
KC2.2
1 2/20/07
125
KC2.2
1 2/20/07
140.9
KC2.2
1 2/20/07
157.1
KC2.2
1 2/20/07
141.1
KC2.2
1 2/20/07
94.7
KC2.2
1 2/20/07
78.2
KC2.2
1 2/20/07
79.8
KC2.2
1 2/20/07
82.9
KC2.2
1 2/20/07
79.4
KC2.2
1 2/20/07
84.4
KC2.2
1 2/20/07
89.4
KC2.2
1 2/20/07
107.4
KC2.2
1 2/20/07
128.5
KC2.2
1 2/20/07
161.5
KC2.2
1 2/20/07
179.3
KC2.2
1 2/20/07
143.1
KC2.2
1 2/20/07
83.1
KC2.2
1 2/20/07
82
KC2.2
1 2/20/07
79.3
KC2.2
1 2/20/07
74.8
KC2.2
1 2/20/07
69.2
KC2.2
1 2/20/07
65.2
KC2.2
1 2/20/07
55.9
KC2.2
1 2/20/07
64.4
KC2.2
1 2/20/07
156.6
KC2.2
1 2/20/07
149.6
KC2.2
12/21/07
54.5
KC2.2
12/21/07
54.9
KC2.2
12/21/07
52.2
KC2.2
12/21/07
52.3
KC2.2
12/21/07
52.6
KC2.2
12/21/07
54.8
KC2.2
12/21/07
56.1
KC2.2
12/21/07
58
KC2.2
12/21/07
57
KC2.2
12/21/07
58.1
KC2.2
12/21/07
57.4
KC2.2
12/21/07
59.2
KC2.2
12/21/07
62.3
KC2.2
12/21/07
67.4
KC2.2
12/21/07
72
KC2.2
12/21/07
78.6
F-237

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
12/21/07
82.1
KC2.2
12/21/07
76.5
KC2.2
12/21/07
69
KC2.2
12/21/07
70.9
KC2.2
12/21/07
79.7
KC2.2
12/21/07
92.2
KC2.2
12/21/07
104.9
KC2.2
12/21/07
108.2
KC2.2
12/21/07
73.1
KC2.2
12/21/07
68.9
KC2.2
12/21/07
65.7
KC2.2
12/21/07
64.8
KC2.2
12/21/07
67.7
KC2.2
12/21/07
74.4
KC2.2
12/21/07
84.1
KC2.2
12/21/07
103.3
KC2.2
12/21/07
120.7
KC2.2
12/21/07
117.1
KC2.2
12/21/07
83.5
KC2.2
12/21/07
74.2
KC2.2
12/21/07
60.9
KC2.2
12/21/07
44.1
KC2.2
12/21/07
49.1
KC2.2
12/21/07
102.3
KC2.2
12/21/07
102.7
KC2.2
12/22/07
70.9
KC2.2
12/22/07
76.7
KC2.2
12/22/07
60.6
KC2.2
12/22/07
58.5
KC2.2
12/22/07
58.8
KC2.2
12/22/07
61.3
KC2.2
12/22/07
65.6
KC2.2
12/22/07
77.1
KC2.2
12/22/07
98.5
KC2.2
12/22/07
108.6
KC2.2
12/22/07
109
KC2.2
12/22/07
96.6
KC2.2
12/22/07
92.6
KC2.2
12/22/07
75.5
KC2.2
12/22/07
77.1
KC2.2
12/22/07
80.3
KC2.2
12/22/07
93.1
KC2.2
12/22/07
121.8
KC2.2
12/22/07
143.4
KC2.2
12/22/07
134.4
F-238

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
12/22/07
97.4
KC2.2
12/22/07
84.9
KC2.2
12/22/07
73
KC2.2
12/22/07
85.3
KC2.2
12/22/07
123.9
KC2.2
12/22/07
155.2
KC2.2
12/22/07
170.2
KC2.2
12/22/07
126.1
KC2.2
12/22/07
116
KC2.2
12/22/07
141.1
KC2.2
12/22/07
161.8
KC2.2
12/22/07
160.9
KC2.2
12/22/07
154.6
KC2.2
12/22/07
153.8
KC2.2
12/22/07
147.1
KC2.2
12/22/07
141.7
KC2.2
12/22/07
125.1
KC2.2
12/22/07
112.2
KC2.2
12/22/07
102.7
KC2.2
12/22/07
98.6
KC2.2
12/22/07
102.1
KC2.2
12/22/07
113.8
KC2.2
12/22/07
122.2
KC2.2
12/22/07
106.6
KC2.2
12/22/07
62.5
KC2.2
12/22/07
52.8
KC2.2
12/22/07
66.4
KC2.2
12/22/07
85.9
KC2.2
12/22/07
104.5
KC2.2
12/22/07
94.5
KC2.2
12/22/07
58.8
KC2.2
12/22/07
10.7
KC2.2
12/22/07
14.5
KC2.2
12/22/07
78.5
KC2.2
12/23/07
68.7
KC2.2
12/23/07
67.7
KC2.2
12/23/07
67.9
KC2.2
12/23/07
66.3
KC2.2
12/23/07
63.6
KC2.2
12/23/07
57.5
KC2.2
12/23/07
64.2
KC2.2
12/23/07
66.9
KC2.2
12/23/07
67.7
KC2.2
12/23/07
66.3
KC2.2
12/23/07
65
F-239

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
12/23/07
62.2
KC2.2
12/23/07
59.3
KC2.2
12/23/07
53.2
KC2.2
12/23/07
48.4
KC2.2
12/23/07
52.6
KC2.2
12/23/07
58.9
KC2.2
12/23/07
56.2
KC2.2
12/23/07
54.6
KC2.2
12/23/07
50.6
KC2.2
12/23/07
46.9
KC2.2
12/23/07
38.7
KC2.2
12/23/07
32.1
KC2.2
12/23/07
28.4
KC2.2
12/23/07
21.1
KC2.2
12/23/07
26.7
KC2.2
12/23/07
47.5
KC2.2
12/23/07
43
KC2.2
12/23/07
40.5
KC2.2
12/23/07
42.3
KC2.2
12/23/07
40
KC2.2
12/23/07
43.3
KC2.2
12/23/07
41.4
KC2.2
12/23/07
40.8
KC2.2
12/23/07
41.6
KC2.2
12/23/07
52.9
KC2.2
12/23/07
48.2
KC2.2
12/23/07
48.5
KC2.2
12/23/07
51.6
KC2.2
12/23/07
49.3
KC2.2
12/23/07
49.5
KC2.2
12/23/07
49
KC2.2
12/23/07
49.4
KC2.2
12/23/07
49.9
KC2.2
12/23/07
53.6
KC2.2
12/23/07
65.5
KC2.2
12/23/07
73.3
KC2.2
12/23/07
54.6
KC2.2
12/23/07
36.6
KC2.2
12/23/07
32.1
KC2.2
12/23/07
40.1
KC2.2
12/23/07
54.2
KC2.2
12/23/07
61.2
KC2.2
1 2/24/07
57.4
KC2.2
1 2/24/07
61.2
KC2.2
1 2/24/07
67.1
F-240

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/24/07
67.5
KC2.2
1 2/24/07
58.7
KC2.2
1 2/24/07
56
KC2.2
1 2/24/07
57.7
KC2.2
1 2/24/07
56
KC2.2
1 2/24/07
59.3
KC2.2
1 2/24/07
71.6
KC2.2
1 2/24/07
77.4
KC2.2
1 2/24/07
78.1
KC2.2
1 2/26/07
46.7
KC2.2
1 2/26/07
46.4
KC2.2
1 2/26/07
48.6
KC2.2
1 2/26/07
56.5
KC2.2
1 2/26/07
63.9
KC2.2
1 2/26/07
67.4
KC2.2
1 2/26/07
59.9
KC2.2
1 2/26/07
52.6
KC2.2
1 2/26/07
52.8
KC2.2
1 2/26/07
49.8
KC2.2
1 2/26/07
52.1
KC2.2
1 2/26/07
54.6
KC2.2
1 2/26/07
65.7
KC2.2
1 2/26/07
78
KC2.2
1 2/26/07
88.5
KC2.2
1 2/26/07
84.6
KC2.2
1 2/26/07
46.5
KC2.2
1 2/26/07
10.1
KC2.2
12/27/07
53.6
KC2.2
12/27/07
67
KC2.2
12/27/07
70.5
KC2.2
12/27/07
60.5
KC2.2
12/27/07
52.1
KC2.2
12/27/07
53.9
KC2.2
12/27/07
58.7
KC2.2
12/27/07
72.7
KC2.2
12/27/07
82.5
KC2.2
12/27/07
82.3
KC2.2
12/27/07
95.2
KC2.2
12/27/07
154.4
KC2.2
12/27/07
222.1
KC2.2
12/27/07
110.3
KC2.2
12/27/07
75.9
KC2.2
12/27/07
70.6
KC2.2
12/27/07
64.4
KC2.2
12/27/07
59.3
F-241

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
12/27/07
62.8
KC2.2
12/27/07
78.6
KC2.2
12/27/07
7.4
KC2.2
12/27/07
7.3
KC2.2
12/27/07
275.8
KC2.2
1 2/28/07
48.7
KC2.2
1 2/28/07
48.7
KC2.2
1 2/28/07
46.7
KC2.2
1 2/28/07
44
KC2.2
1 2/28/07
47.4
KC2.2
1 2/28/07
45.6
KC2.2
1 2/28/07
53
KC2.2
1 2/28/07
77
KC2.2
1 2/28/07
88.7
KC2.2
1 2/28/07
53.7
KC2.2
1 2/28/07
51.1
KC2.2
1 2/28/07
52.6
KC2.2
1 2/28/07
50.5
KC2.2
1 2/28/07
51.6
KC2.2
1 2/28/07
48.3
KC2.2
1 2/28/07
50.5
KC2.2
1 2/28/07
48
KC2.2
1 2/28/07
48.7
KC2.2
1 2/28/07
47
KC2.2
1 2/28/07
46.2
KC2.2
1 2/28/07
48.1
KC2.2
1 2/28/07
45.9
KC2.2
1 2/28/07
47
KC2.2
1 2/28/07
42.9
KC2.2
1 2/28/07
42.8
KC2.2
1 2/28/07
42.6
KC2.2
1 2/28/07
35.9
KC2.2
1 2/28/07
44.9
KC2.2
1 2/28/07
46.8
KC2.2
1 2/28/07
49.3
KC2.2
1 2/28/07
48.1
KC2.2
1 2/28/07
46
KC2.2
1 2/28/07
47
KC2.2
1 2/28/07
41.1
KC2.2
1 2/28/07
34.9
KC2.2
1 2/28/07
26.7
KC2.2
1 2/28/07
21.7
KC2.2
1 2/28/07
14.4
KC2.2
1 2/28/07
35.4
KC2.2
1 2/28/07
46.9
F-242

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/28/07
50.7
KC2.2
1 2/28/07
46.2
KC2.2
1 2/28/07
47.8
KC2.2
1 2/28/07
43.4
KC2.2
1 2/28/07
44
KC2.2
1 2/28/07
44.2
KC2.2
1 2/28/07
45.5
KC2.2
1 2/28/07
57.6
KC2.2
1 2/28/07
61.3
KC2.2
1 2/28/07
53
KC2.2
1 2/28/07
44.8
KC2.2
1 2/28/07
47.9
KC2.2
1 2/28/07
49.5
KC2.2
1 2/28/07
58.8
KC2.2
1 2/28/07
68
KC2.2
1 2/28/07
68.6
KC2.2
1 2/28/07
60.1
KC2.2
1 2/28/07
50.3
KC2.2
1 2/28/07
50
KC2.2
1 2/28/07
47.3
KC2.2
1 2/28/07
48.1
KC2.2
1 2/28/07
46.6
KC2.2
1 2/28/07
51.1
KC2.2
1 2/28/07
54
KC2.2
1 2/28/07
59.1
KC2.2
1 2/28/07
47.3
KC2.2
1 2/28/07
31
KC2.2
1 2/28/07
39.6
KC2.2
1 2/28/07
47.9
KC2.2
1 2/28/07
50.6
KC2.2
1 2/29/07
43.4
KC2.2
1 2/29/07
43.1
KC2.2
1 2/29/07
41.6
KC2.2
1 2/29/07
38.3
KC2.2
1 2/29/07
37.7
KC2.2
1 2/29/07
33.3
KC2.2
1 2/29/07
40.3
KC2.2
1 2/29/07
50.4
KC2.2
1 2/29/07
75
KC2.2
1 2/29/07
142.3
KC2.2
1 2/29/07
81.4
KC2.2
1 2/29/07
35.1
KC2.2
1 2/29/07
41.1
KC2.2
1 2/29/07
45.9
KC2.2
1 2/29/07
44.4
F-243

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
1 2/29/07
43.5
KC2.2
1 2/29/07
47.4
KC2.2
1 2/29/07
45.5
KC2.2
1 2/29/07
46.4
KC2.2
1 2/29/07
44.9
KC2.2
1 2/29/07
43.4
KC2.2
1 2/29/07
42.5
KC2.2
1 2/29/07
37.4
KC2.2
1 2/29/07
42.8
KC2.2
1 2/29/07
44
KC2.2
1 2/29/07
45.9
KC2.2
1 2/29/07
42.8
KC2.2
1 2/29/07
43
KC2.2
1 2/29/07
42.5
KC2.2
1 2/29/07
46.3
KC2.2
1 2/29/07
44.6
KC2.2
1 2/29/07
44.8
KC2.2
1 2/29/07
43.6
KC2.2
1 2/29/07
42.3
KC2.2
1 2/29/07
44.8
KC2.2
1 2/29/07
42.1
KC2.2
1 2/29/07
41.9
KC2.2
1 2/29/07
42.3
KC2.2
1 2/29/07
42.8
KC2.2
1 2/29/07
46.6
KC2.2
1 2/29/07
44.4
KC2.2
1 2/29/07
43.7
KC2.2
1 2/29/07
43.4
KC2.2
1 2/29/07
43.3
KC2.2
1 2/29/07
42.4
KC2.2
1 2/29/07
36.1
KC2.2
1 2/29/07
30.9
KC2.2
1 2/29/07
25
KC2.2
1 2/29/07
27.5
KC2.2
1 2/29/07
45.3
KC2.2
1 2/29/07
50.2
KC2.2
01/02/08
34.7
KC2.2
01/02/08
11.9
KC2.2
01/02/08
12.8
KC2.2
01/02/08
13.8
KC2.2
01/02/08
15.3
KC2.2
01/02/08
18.8
KC2.2
01/02/08
21.3
KC2.2
01/02/08
21.4
KC2.2
01/02/08
26.9
F-244

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
01/02/08
27.2
KC2.2
01/02/08
28.2
KC2.2
01/04/08
22.2
KC2.2
01/04/08
19.6
KC2.2
01/04/08
19.9
KC2.2
01/04/08
20.2
KC2.2
01/04/08
20
KC2.2
01/04/08
20.8
KC2.2
01/04/08
23.6
KC2.2
01/04/08
25.1
KC2.2
01/04/08
27.8
KC2.2
01/04/08
30.4
KC2.2
01/04/08
31.8
KC2.2
01/04/08
31.6
KC2.2
01/04/08
31.7
KC2.2
01/14/08
100.9
KC2.2
01/14/08
77.4
KC2.2
01/14/08
83.6
KC2.2
01/14/08
106.7
KC2.2
01/14/08
104.6
KC2.2
01/15/08
139
KC2.2
01/15/08
158.8
KC2.2
01/15/08
167
KC2.2
01/15/08
168.9
KC2.2
01/15/08
172.4
KC2.2
01/15/08
180.3
KC2.2
01/15/08
187
KC2.2
01/15/08
186.3
KC2.2
01/15/08
184.7
KC2.2
01/15/08
184.1
KC2.2
01/15/08
183.2
KC2.2
01/15/08
300.6
KC2.2
01/15/08
208.2
KC2.2
01/15/08
177.8
KC2.2
01/15/08
251.8
KC2.2
01/15/08
196.6
KC2.2
01/15/08
206.4
KC2.2
01/15/08
191.6
KC2.2
01/15/08
206
KC2.2
01/28/08
54.7
KC2.2
01/28/08
44
KC2.2
01/28/08
55.4
KC2.2
01/28/08
48.3
KC2.2
01/28/08
47.2
KC2.2
01/28/08
49.9
F-245

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
01/28/08
51
KC2.2
01/28/08
54.6
KC2.2
01/28/08
55.1
KC2.2
01/28/08
55.3
KC2.2
01/28/08
56.4
KC2.2
01/28/08
57.6
KC2.2
01/28/08
57.6
KC2.2
01/28/08
59.1
KC2.2
01/28/08
60.6
KC2.2
01/28/08
58.4
KC2.2
01/28/08
54
KC2.2
01/28/08
51.8
KC2.2
01/28/08
52.8
KC2.2
01/28/08
53.7
KC2.2
01/29/08
69.1
KC2.2
01/29/08
92.8
KC2.2
01/29/08
47.4
KC2.2
01/29/08
61.3
KC2.2
01/29/08
46.2
KC2.2
01/29/08
48.7
KC2.2
01/29/08
50.5
KC2.2
01/29/08
48.6
KC2.2
01/29/08
45.3
KC2.2
01/29/08
44.7
KC2.2
01/29/08
45
KC2.2
01/29/08
45.1
KC2.2
01/29/08
45.8
KC2.2
01/29/08
42.7
KC2.2
01/29/08
73.3
KC2.2
01/29/08
41.8
KC2.2
01/29/08
45.5
KC2.2
01/29/08
46.3
KC2.2
01/29/08
45.8
KC2.2
01/29/08
46.9
KC2.2
01/29/08
43.6
KC2.2
01/29/08
43.4
KC2.2
01/29/08
42.9
KC2.2
01/29/08
42.7
KC2.2
01/29/08
30.5
KC2.2
01/29/08
47.4
KC2.2
01/29/08
46.2
KC2.2
01/29/08
50
KC2.2
01/29/08
48.9
KC2.2
01/29/08
51.6
KC2.2
01/29/08
52.1
F-246

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.2
01/29/08
53.9
KC2.2
01/29/08
55
KC2.2
01/29/08
54.2
KC2.2
01/29/08
58.8
KC2.2
01/29/08
59.4
KC2.2
01/29/08
62.2
KC2.2
01/29/08
62.8
KC2.2
01/29/08
73.7
KC2.2
01/30/08
74.6
KC2.2
01/30/08
2.5
KC2.2
01/30/08
65.5
KC2.2
01/30/08
71
KC2.2
01/30/08
77.6
KC2.2
01/30/08
79
KC2.2
01/30/08
76.9
KC2.2
01/30/08
74.1
KC2.2
01/30/08
76.3
KC2.2
01/30/08
78.7
KC2.2
01/30/08
77.9
KC2.2
01/30/08
81.3
KC2.2
01/30/08
81.7
KC2.2
01/30/08
81
KC2.2
01/30/08
68.9
KC2.2
01/31/08
33.9
KC2.2
01/31/08
53.7
KC2.2
01/31/08
64.8
KC2.2
01/31/08
69.6
KC2.2
01/31/08
72.3
KC2.2
01/31/08
73.1
KC2.2
01/31/08
73.6
KC2.2
01/31/08
70.6
KC2.2
01/31/08
70.8
KC2.2
01/31/08
69.3
KC2.2
01/31/08
68.3
KC2.2
01/31/08
74.4
KC2.2
01/31/08
81.1
KC2.2
01/31/08
74.2
KC2.2
01/31/08
72.2
KC2.2
01/31/08
73.8
KC2.2
01/31/08
71
KC2.2
01/31/08
73
KC2.2
01/31/08
76.6
KC2.3
1 2/02/07
61.6
KC2.3
1 2/02/07
58.5
KC2.3
1 2/02/07
57.3
F-247

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/02/07
52
KC2.3
1 2/02/07
50.8
KC2.3
1 2/02/07
52.8
KC2.3
1 2/02/07
64.2
KC2.3
1 2/02/07
73.5
KC2.3
1 2/02/07
77.6
KC2.3
1 2/02/07
86.4
KC2.3
1 2/02/07
88
KC2.3
1 2/02/07
74.1
KC2.3
1 2/02/07
67
KC2.3
1 2/02/07
61.9
KC2.3
1 2/02/07
60.9
KC2.3
1 2/02/07
61.3
KC2.3
1 2/02/07
73.9
KC2.3
1 2/02/07
94.9
KC2.3
1 2/02/07
109.2
KC2.3
1 2/02/07
109.6
KC2.3
1 2/02/07
86.3
KC2.3
1 2/02/07
85
KC2.3
1 2/02/07
82.9
KC2.3
1 2/02/07
84.3
KC2.3
1 2/02/07
97
KC2.3
1 2/02/07
115.3
KC2.3
1 2/02/07
105.6
KC2.3
1 2/02/07
90.4
KC2.3
1 2/02/07
87.3
KC2.3
1 2/02/07
86.6
KC2.3
1 2/02/07
90.3
KC2.3
1 2/02/07
105.7
KC2.3
1 2/02/07
93.5
KC2.3
1 2/02/07
90.4
KC2.3
1 2/02/07
79
KC2.3
1 2/02/07
68.8
KC2.3
1 2/02/07
67.7
KC2.3
1 2/02/07
67
KC2.3
1 2/02/07
63.5
KC2.3
1 2/02/07
60.1
KC2.3
1 2/02/07
59.8
KC2.3
1 2/02/07
65.9
KC2.3
1 2/02/07
61.9
KC2.3
1 2/02/07
54
KC2.3
1 2/02/07
53.5
KC2.3
1 2/02/07
51
KC2.3
1 2/02/07
49.9
KC2.3
1 2/02/07
48.9
F-248

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/02/07
51.4
KC2.3
1 2/02/07
58.2
KC2.3
1 2/02/07
60.1
KC2.3
1 2/02/07
49.8
KC2.3
1 2/02/07
41
KC2.3
1 2/02/07
42.5
KC2.3
1 2/02/07
47.7
KC2.3
1 2/02/07
53.2
KC2.3
1 2/02/07
48.9
KC2.3
1 2/02/07
43.1
KC2.3
1 2/02/07
43.2
KC2.3
1 2/02/07
42.5
KC2.3
1 2/02/07
41.8
KC2.3
1 2/02/07
43
KC2.3
1 2/02/07
41.9
KC2.3
1 2/02/07
40
KC2.3
1 2/02/07
40.4
KC2.3
1 2/02/07
39.7
KC2.3
1 2/02/07
41.5
KC2.3
1 2/02/07
42.1
KC2.3
1 2/02/07
43.1
KC2.3
1 2/02/07
43.5
KC2.3
1 2/02/07
44.8
KC2.3
1 2/02/07
46.3
KC2.3
1 2/02/07
48.5
KC2.3
1 2/02/07
51.4
KC2.3
1 2/02/07
53.8
KC2.3
1 2/02/07
55.2
KC2.3
1 2/02/07
55.8
KC2.3
1 2/02/07
56.3
KC2.3
1 2/02/07
58
KC2.3
1 2/02/07
58.4
KC2.3
1 2/02/07
59.9
KC2.3
1 2/02/07
55.9
KC2.3
1 2/02/07
51.3
KC2.3
1 2/02/07
44.3
KC2.3
1 2/02/07
36.2
KC2.3
1 2/02/07
25.1
KC2.3
1 2/02/07
14.2
KC2.3
1 2/02/07
9.9
KC2.3
1 2/02/07
9
KC2.3
1 2/02/07
4.4
KC2.3
1 2/02/07
9.4
KC2.3
1 2/03/07
76.1
KC2.3
1 2/03/07
99.5
F-249

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/03/07
115.7
KC2.3
1 2/03/07
122.5
KC2.3
1 2/03/07
97.4
KC2.3
1 2/03/07
134.3
KC2.3
1 2/03/07
574
KC2.3
1 2/03/07
557
KC2.3
1 2/03/07
212.6
KC2.3
1 2/03/07
87.7
KC2.3
1 2/03/07
69.8
KC2.3
1 2/03/07
66.1
KC2.3
1 2/03/07
74.2
KC2.3
1 2/03/07
92.8
KC2.3
1 2/03/07
108.8
KC2.3
1 2/03/07
120.3
KC2.3
1 2/03/07
120.5
KC2.3
1 2/03/07
116.4
KC2.3
1 2/03/07
172.7
KC2.3
1 2/03/07
151.1
KC2.3
1 2/03/07
71.7
KC2.3
1 2/03/07
67.2
KC2.3
1 2/03/07
68.9
KC2.3
1 2/03/07
78.1
KC2.3
1 2/03/07
93.9
KC2.3
1 2/03/07
99.2
KC2.3
1 2/03/07
94.9
KC2.3
1 2/03/07
72.3
KC2.3
1 2/03/07
80
KC2.3
1 2/03/07
90.7
KC2.3
1 2/03/07
87.9
KC2.3
1 2/03/07
80.6
KC2.3
1 2/03/07
84.8
KC2.3
1 2/03/07
90.6
KC2.3
1 2/03/07
74.6
KC2.3
1 2/03/07
86.6
KC2.3
1 2/03/07
163.4
KC2.3
1 2/03/07
126.7
KC2.3
1 2/03/07
113
KC2.3
1 2/03/07
91.1
KC2.3
1 2/03/07
86.6
KC2.3
1 2/03/07
124.8
KC2.3
1 2/03/07
129.7
KC2.3
1 2/03/07
112.7
KC2.3
1 2/03/07
104
KC2.3
1 2/03/07
110
KC2.3
1 2/03/07
139
F-250

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/03/07
146.6
KC2.3
1 2/03/07
109
KC2.3
1 2/03/07
116.1
KC2.3
1 2/03/07
161.8
KC2.3
1 2/03/07
150.5
KC2.3
1 2/03/07
125.2
KC2.3
1 2/03/07
144.7
KC2.3
1 2/03/07
143.5
KC2.3
1 2/03/07
172.9
KC2.3
1 2/03/07
196
KC2.3
1 2/03/07
168.5
KC2.3
1 2/03/07
134.9
KC2.3
1 2/03/07
132.8
KC2.3
1 2/03/07
132.1
KC2.3
1 2/03/07
136.1
KC2.3
1 2/03/07
144.9
KC2.3
1 2/03/07
138.4
KC2.3
1 2/03/07
142.2
KC2.3
1 2/03/07
156.4
KC2.3
1 2/03/07
150.6
KC2.3
1 2/03/07
153.8
KC2.3
1 2/03/07
145
KC2.3
1 2/03/07
151.8
KC2.3
1 2/03/07
141.4
KC2.3
1 2/03/07
134
KC2.3
1 2/03/07
138.6
KC2.3
1 2/03/07
135.7
KC2.3
1 2/03/07
116.5
KC2.3
1 2/03/07
111.1
KC2.3
1 2/03/07
106.6
KC2.3
1 2/03/07
107.4
KC2.3
1 2/03/07
103.1
KC2.3
1 2/03/07
90.9
KC2.3
1 2/03/07
90.5
KC2.3
1 2/03/07
111.3
KC2.3
1 2/03/07
172.9
KC2.3
1 2/03/07
260
KC2.3
1 2/03/07
231.7
KC2.3
1 2/03/07
147
KC2.3
1 2/03/07
114.7
KC2.3
1 2/03/07
71
KC2.3
1 2/03/07
56.5
KC2.3
1 2/03/07
64
KC2.3
1 2/04/07
80.2
KC2.3
1 2/04/07
87.9
F-251

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/04/07
98.2
KC2.3
1 2/04/07
89.1
KC2.3
1 2/04/07
80
KC2.3
1 2/04/07
79.2
KC2.3
1 2/04/07
86.9
KC2.3
1 2/04/07
103.7
KC2.3
1 2/04/07
117.1
KC2.3
1 2/04/07
101.5
KC2.3
1 2/04/07
91.1
KC2.3
1 2/04/07
84.3
KC2.3
1 2/04/07
80.5
KC2.3
1 2/04/07
85.5
KC2.3
1 2/04/07
96
KC2.3
1 2/04/07
93.5
KC2.3
1 2/04/07
91.2
KC2.3
1 2/04/07
93.5
KC2.3
1 2/04/07
96.2
KC2.3
1 2/04/07
95.6
KC2.3
1 2/04/07
90.7
KC2.3
1 2/04/07
84
KC2.3
1 2/04/07
77.2
KC2.3
1 2/04/07
76.6
KC2.3
1 2/04/07
74.7
KC2.3
1 2/04/07
82.1
KC2.3
1 2/04/07
88.6
KC2.3
1 2/04/07
97.5
KC2.3
1 2/04/07
109.3
KC2.3
1 2/04/07
101.2
KC2.3
1 2/04/07
89
KC2.3
1 2/04/07
81.8
KC2.3
1 2/04/07
85.8
KC2.3
1 2/04/07
100.5
KC2.3
1 2/04/07
124.8
KC2.3
1 2/04/07
131.3
KC2.3
1 2/04/07
119.2
KC2.3
1 2/04/07
109.8
KC2.3
1 2/04/07
126.7
KC2.3
1 2/04/07
159.9
KC2.3
1 2/04/07
145.7
KC2.3
1 2/04/07
129.6
KC2.3
1 2/04/07
128.9
KC2.3
1 2/04/07
120.8
KC2.3
1 2/04/07
105.3
KC2.3
1 2/04/07
106.1
KC2.3
1 2/04/07
121.6
F-252

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/04/07
144
KC2.3
1 2/04/07
150.2
KC2.3
1 2/04/07
155.3
KC2.3
1 2/04/07
169.7
KC2.3
1 2/04/07
168.1
KC2.3
1 2/04/07
138.9
KC2.3
1 2/04/07
110.5
KC2.3
1 2/04/07
92.1
KC2.3
1 2/04/07
79.4
KC2.3
1 2/04/07
87.9
KC2.3
1 2/04/07
123.2
KC2.3
1 2/04/07
121.6
KC2.3
1 2/04/07
126.2
KC2.3
1 2/04/07
126.5
KC2.3
1 2/04/07
105.6
KC2.3
1 2/04/07
93.8
KC2.3
1 2/04/07
113.7
KC2.3
1 2/04/07
139.6
KC2.3
1 2/04/07
144.4
KC2.3
1 2/04/07
142.2
KC2.3
1 2/04/07
127.2
KC2.3
1 2/04/07
90.5
KC2.3
1 2/04/07
75.2
KC2.3
1 2/04/07
70.3
KC2.3
1 2/04/07
90.6
KC2.3
1 2/04/07
111.1
KC2.3
1 2/04/07
120
KC2.3
1 2/04/07
110.9
KC2.3
1 2/04/07
89.4
KC2.3
1 2/04/07
73.1
KC2.3
1 2/04/07
64.8
KC2.3
1 2/04/07
71.5
KC2.3
1 2/04/07
86.6
KC2.3
1 2/04/07
101.1
KC2.3
1 2/04/07
111.3
KC2.3
1 2/04/07
114.5
KC2.3
1 2/04/07
71.9
KC2.3
1 2/04/07
60.9
KC2.3
1 2/04/07
62.3
KC2.3
1 2/04/07
83.1
KC2.3
1 2/04/07
90.3
KC2.3
1 2/04/07
90.7
KC2.3
1 2/04/07
68.8
KC2.3
1 2/04/07
46.8
KC2.3
1 2/04/07
65.9
F-253

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/05/07
85.6
KC2.3
1 2/05/07
87.7
KC2.3
1 2/05/07
76.2
KC2.3
1 2/05/07
61.9
KC2.3
1 2/05/07
55.2
KC2.3
1 2/05/07
53.8
KC2.3
1 2/05/07
63.9
KC2.3
1 2/05/07
64.9
KC2.3
1 2/05/07
77.2
KC2.3
1 2/05/07
79.2
KC2.3
1 2/05/07
69
KC2.3
1 2/05/07
61
KC2.3
1 2/05/07
56.9
KC2.3
1 2/05/07
63.1
KC2.3
1 2/05/07
67.1
KC2.3
1 2/05/07
79.1
KC2.3
1 2/05/07
82.9
KC2.3
1 2/05/07
74.9
KC2.3
1 2/05/07
70
KC2.3
1 2/05/07
64.5
KC2.3
1 2/05/07
59.7
KC2.3
1 2/05/07
64.8
KC2.3
1 2/05/07
74.5
KC2.3
1 2/05/07
72.3
KC2.3
1 2/05/07
57.1
KC2.3
1 2/05/07
56
KC2.3
1 2/05/07
63.1
KC2.3
1 2/05/07
75.6
KC2.3
1 2/05/07
91.8
KC2.3
1 2/05/07
93.7
KC2.3
1 2/05/07
76.9
KC2.3
1 2/05/07
70.3
KC2.3
1 2/05/07
62.4
KC2.3
1 2/05/07
60.8
KC2.3
1 2/05/07
64.4
KC2.3
1 2/05/07
78.1
KC2.3
1 2/05/07
87
KC2.3
1 2/05/07
87.1
KC2.3
1 2/05/07
75.7
KC2.3
1 2/05/07
68.8
KC2.3
1 2/05/07
64.1
KC2.3
1 2/05/07
64.8
KC2.3
1 2/05/07
77.6
KC2.3
1 2/05/07
90.4
KC2.3
1 2/05/07
88
F-254

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/05/07
77.4
KC2.3
1 2/05/07
71.6
KC2.3
1 2/05/07
66.3
KC2.3
1 2/05/07
74.7
KC2.3
1 2/05/07
88.2
KC2.3
1 2/05/07
86.2
KC2.3
1 2/05/07
75.2
KC2.3
1 2/05/07
70.4
KC2.3
1 2/05/07
78.3
KC2.3
1 2/05/07
72.8
KC2.3
1 2/05/07
69.3
KC2.3
1 2/05/07
80.8
KC2.3
1 2/05/07
92.7
KC2.3
1 2/05/07
90.9
KC2.3
1 2/05/07
76.8
KC2.3
1 2/05/07
67.3
KC2.3
1 2/05/07
64.2
KC2.3
1 2/05/07
60.6
KC2.3
1 2/05/07
69.7
KC2.3
1 2/05/07
82.7
KC2.3
1 2/05/07
89.7
KC2.3
1 2/05/07
93.4
KC2.3
1 2/05/07
77.8
KC2.3
1 2/05/07
70
KC2.3
1 2/05/07
66.4
KC2.3
1 2/05/07
68.5
KC2.3
1 2/05/07
76.4
KC2.3
1 2/05/07
86.3
KC2.3
1 2/05/07
80.4
KC2.3
1 2/05/07
70.5
KC2.3
1 2/05/07
72.2
KC2.3
1 2/05/07
80.5
KC2.3
1 2/05/07
91.3
KC2.3
1 2/05/07
93.1
KC2.3
1 2/05/07
83.2
KC2.3
1 2/05/07
76.5
KC2.3
1 2/05/07
69.9
KC2.3
1 2/05/07
68.5
KC2.3
1 2/05/07
72.5
KC2.3
1 2/05/07
79.3
KC2.3
1 2/05/07
94.4
KC2.3
1 2/05/07
99.2
KC2.3
1 2/05/07
81.7
KC2.3
1 2/05/07
65.9
KC2.3
1 2/05/07
56.9
F-255

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/05/07
53.2
KC2.3
1 2/05/07
94.4
KC2.3
1 2/05/07
71.5
KC2.3
1 2/06/07
68.7
KC2.3
1 2/06/07
65.6
KC2.3
1 2/06/07
66.8
KC2.3
1 2/06/07
64.1
KC2.3
1 2/06/07
62.7
KC2.3
1 2/06/07
80.4
KC2.3
1 2/06/07
87.3
KC2.3
1 2/06/07
97.4
KC2.3
1 2/06/07
111.2
KC2.3
1 2/06/07
106.1
KC2.3
1 2/06/07
88.1
KC2.3
1 2/06/07
76.2
KC2.3
1 2/06/07
73.3
KC2.3
1 2/06/07
69.3
KC2.3
1 2/06/07
64.8
KC2.3
1 2/06/07
62.6
KC2.3
1 2/06/07
56.8
KC2.3
1 2/06/07
58.7
KC2.3
1 2/06/07
62.8
KC2.3
1 2/06/07
65.2
KC2.3
1 2/06/07
72.7
KC2.3
1 2/06/07
81.7
KC2.3
1 2/06/07
80.5
KC2.3
1 2/06/07
65
KC2.3
1 2/06/07
61.9
KC2.3
1 2/06/07
66.5
KC2.3
1 2/06/07
74.5
KC2.3
1 2/06/07
84.9
KC2.3
1 2/06/07
90.3
KC2.3
1 2/06/07
94.7
KC2.3
1 2/06/07
80.5
KC2.3
1 2/06/07
64.7
KC2.3
1 2/06/07
62.3
KC2.3
1 2/06/07
63.1
KC2.3
1 2/06/07
71
KC2.3
1 2/06/07
82.5
KC2.3
1 2/06/07
92.8
KC2.3
1 2/06/07
96.4
KC2.3
1 2/06/07
109
KC2.3
1 2/06/07
106
KC2.3
1 2/06/07
95
KC2.3
1 2/06/07
72.3
F-256

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/06/07
62.9
KC2.3
1 2/06/07
61.5
KC2.3
1 2/06/07
65.6
KC2.3
1 2/06/07
74.8
KC2.3
1 2/06/07
77.2
KC2.3
1 2/06/07
82.2
KC2.3
1 2/06/07
76.6
KC2.3
1 2/06/07
64.2
KC2.3
1 2/06/07
58.1
KC2.3
1 2/06/07
67.4
KC2.3
1 2/06/07
71.8
KC2.3
1 2/06/07
78.2
KC2.3
1 2/06/07
93.9
KC2.3
1 2/06/07
138.2
KC2.3
1 2/06/07
166
KC2.3
1 2/06/07
92.3
KC2.3
1 2/06/07
67.7
KC2.3
1 2/06/07
59.5
KC2.3
1 2/06/07
54.7
KC2.3
1 2/06/07
66.3
KC2.3
1 2/06/07
70.9
KC2.3
1 2/06/07
79.4
KC2.3
1 2/06/07
77.6
KC2.3
1 2/06/07
64.1
KC2.3
1 2/06/07
57.6
KC2.3
1 2/06/07
54.6
KC2.3
1 2/06/07
63.8
KC2.3
1 2/06/07
70.8
KC2.3
1 2/06/07
66.6
KC2.3
1 2/06/07
57.6
KC2.3
1 2/06/07
53.5
KC2.3
1 2/06/07
54.7
KC2.3
1 2/06/07
55
KC2.3
1 2/06/07
62.9
KC2.3
1 2/06/07
65
KC2.3
1 2/06/07
97.5
KC2.3
1 2/06/07
72.4
KC2.3
1 2/06/07
59.3
KC2.3
1 2/06/07
57.4
KC2.3
1 2/06/07
59.4
KC2.3
1 2/06/07
64.7
KC2.3
1 2/06/07
78.3
KC2.3
1 2/06/07
87.6
KC2.3
1 2/06/07
130.1
KC2.3
1 2/06/07
115.8
F-257

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/06/07
72.1
KC2.3
1 2/06/07
48.5
KC2.3
1 2/06/07
42.3
KC2.3
1 2/06/07
45.3
KC2.3
1 2/06/07
76.8
KC2.3
1 2/07/07
66
KC2.3
1 2/07/07
63.1
KC2.3
1 2/07/07
64.2
KC2.3
1 2/07/07
63
KC2.3
1 2/07/07
64.8
KC2.3
1 2/07/07
65
KC2.3
1 2/07/07
65.1
KC2.3
1 2/07/07
62.2
KC2.3
1 2/07/07
45.7
KC2.3
1 2/07/07
43.3
KC2.3
1 2/07/07
46.5
KC2.3
1 2/07/07
72.9
KC2.3
1 2/07/07
153.4
KC2.3
1 2/07/07
137
KC2.3
1 2/07/07
50.4
KC2.3
1 2/07/07
50.6
KC2.3
1 2/07/07
54
KC2.3
1 2/07/07
56
KC2.3
1 2/07/07
57.6
KC2.3
1 2/07/07
56.2
KC2.3
1 2/07/07
56.8
KC2.3
1 2/07/07
60.4
KC2.3
1 2/07/07
73.9
KC2.3
1 2/07/07
76.1
KC2.3
1 2/07/07
65
KC2.3
1 2/07/07
57.4
KC2.3
1 2/07/07
57.4
KC2.3
1 2/07/07
73.7
KC2.3
1 2/07/07
80.4
KC2.3
1 2/07/07
68.9
KC2.3
1 2/07/07
63.2
KC2.3
1 2/07/07
58.5
KC2.3
1 2/07/07
61.7
KC2.3
1 2/07/07
77.5
KC2.3
1 2/07/07
77.8
KC2.3
1 2/07/07
74.5
KC2.3
1 2/07/07
64.3
KC2.3
1 2/07/07
58.9
KC2.3
1 2/07/07
60.8
KC2.3
1 2/07/07
61.7
F-258

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/07/07
77
KC2.3
1 2/07/07
81.4
KC2.3
1 2/07/07
60.6
KC2.3
1 2/07/07
61.1
KC2.3
1 2/07/07
64.5
KC2.3
1 2/07/07
78.6
KC2.3
1 2/07/07
91.2
KC2.3
1 2/07/07
82.8
KC2.3
1 2/07/07
71.2
KC2.3
1 2/07/07
66.7
KC2.3
1 2/07/07
61.8
KC2.3
1 2/07/07
72
KC2.3
1 2/07/07
80.1
KC2.3
1 2/07/07
83.6
KC2.3
1 2/07/07
78.4
KC2.3
1 2/07/07
72.8
KC2.3
1 2/07/07
66.3
KC2.3
1 2/07/07
70.6
KC2.3
1 2/07/07
82.8
KC2.3
1 2/07/07
83
KC2.3
1 2/07/07
81.4
KC2.3
1 2/07/07
73.7
KC2.3
1 2/07/07
60.3
KC2.3
1 2/07/07
62.4
KC2.3
1 2/07/07
83.2
KC2.3
1 2/07/07
122.8
KC2.3
1 2/07/07
197.3
KC2.3
1 2/07/07
197.9
KC2.3
1 2/07/07
319.3
KC2.3
1 2/07/07
151.2
KC2.3
1 2/07/07
46
KC2.3
1 2/07/07
46.9
KC2.3
1 2/07/07
58.6
KC2.3
1 2/07/07
72.2
KC2.3
1 2/07/07
77.5
KC2.3
1 2/07/07
79.6
KC2.3
1 2/07/07
88.5
KC2.3
1 2/07/07
76.7
KC2.3
1 2/07/07
78.8
KC2.3
1 2/07/07
81.3
KC2.3
1 2/07/07
80.3
KC2.3
1 2/07/07
71.9
KC2.3
1 2/07/07
83.7
KC2.3
1 2/07/07
91.3
KC2.3
1 2/07/07
99.8
F-259

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/07/07
80.3
KC2.3
1 2/07/07
86.5
KC2.3
1 2/07/07
63.4
KC2.3
1 2/07/07
51.1
KC2.3
1 2/07/07
65.5
KC2.3
1 2/07/07
72.6
KC2.3
1 2/07/07
73.3
KC2.3
1 2/08/07
65.2
KC2.3
1 2/08/07
73.8
KC2.3
1 2/08/07
71.9
KC2.3
1 2/08/07
74.2
KC2.3
1 2/08/07
71.4
KC2.3
1 2/08/07
69.2
KC2.3
1 2/08/07
71.3
KC2.3
1 2/08/07
76.7
KC2.3
1 2/08/07
75.7
KC2.3
1 2/08/07
56
KC2.3
1 2/08/07
57.1
KC2.3
1 2/08/07
63.8
KC2.3
1 2/08/07
70
KC2.3
1 2/08/07
70.2
KC2.3
1 2/08/07
70.7
KC2.3
1 2/08/07
68.7
KC2.3
1 2/08/07
71.8
KC2.3
1 2/08/07
75.5
KC2.3
1 2/08/07
75
KC2.3
1 2/08/07
73.8
KC2.3
1 2/08/07
77.9
KC2.3
1 2/08/07
96
KC2.3
1 2/08/07
115.8
KC2.3
1 2/08/07
94.5
KC2.3
1 2/08/07
85.6
KC2.3
1 2/08/07
65.2
KC2.3
1 2/08/07
72
KC2.3
1 2/08/07
69.3
KC2.3
1 2/08/07
74.4
KC2.3
1 2/08/07
74.8
KC2.3
1 2/08/07
75.7
KC2.3
1 2/08/07
76.1
KC2.3
1 2/08/07
77.7
KC2.3
1 2/08/07
82
KC2.3
1 2/08/07
74.1
KC2.3
1 2/08/07
67
KC2.3
1 2/08/07
61.2
KC2.3
1 2/08/07
59.8
F-260

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/08/07
60.8
KC2.3
1 2/08/07
64.6
KC2.3
1 2/08/07
68.2
KC2.3
1 2/08/07
70.8
KC2.3
1 2/08/07
70.3
KC2.3
1 2/08/07
68.5
KC2.3
1 2/08/07
72
KC2.3
1 2/08/07
72.7
KC2.3
1 2/08/07
70.4
KC2.3
1 2/08/07
71.1
KC2.3
1 2/08/07
66.4
KC2.3
1 2/08/07
62.8
KC2.3
1 2/08/07
58.5
KC2.3
1 2/08/07
61.3
KC2.3
1 2/08/07
65
KC2.3
1 2/08/07
70
KC2.3
1 2/08/07
69.6
KC2.3
1 2/08/07
71.2
KC2.3
1 2/08/07
67.3
KC2.3
1 2/08/07
69.7
KC2.3
1 2/08/07
77.4
KC2.3
1 2/08/07
71.6
KC2.3
1 2/08/07
54.8
KC2.3
1 2/08/07
53.8
KC2.3
1 2/08/07
56.1
KC2.3
1 2/08/07
61.2
KC2.3
1 2/08/07
59.6
KC2.3
1 2/08/07
65.3
KC2.3
1 2/08/07
69.8
KC2.3
1 2/08/07
78.1
KC2.3
1 2/08/07
82.9
KC2.3
1 2/08/07
73.1
KC2.3
1 2/08/07
61.6
KC2.3
1 2/08/07
59
KC2.3
1 2/08/07
60.9
KC2.3
1 2/08/07
68
KC2.3
1 2/08/07
72.6
KC2.3
1 2/08/07
73.9
KC2.3
1 2/08/07
75.7
KC2.3
1 2/08/07
73.1
KC2.3
1 2/08/07
71
KC2.3
1 2/08/07
76.2
KC2.3
1 2/08/07
69.7
KC2.3
1 2/08/07
70.8
KC2.3
1 2/08/07
69.2
F-261

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/08/07
63.3
KC2.3
1 2/08/07
55.7
KC2.3
1 2/08/07
48.4
KC2.3
1 2/08/07
43
KC2.3
1 2/08/07
43.3
KC2.3
1 2/08/07
38.2
KC2.3
1 2/08/07
50.2
KC2.3
1 2/08/07
67.2
KC2.3
1 2/09/07
70
KC2.3
1 2/09/07
69.6
KC2.3
1 2/09/07
68.8
KC2.3
1 2/09/07
77.3
KC2.3
1 2/09/07
85.2
KC2.3
1 2/09/07
74.4
KC2.3
1 2/09/07
62.2
KC2.3
1 2/09/07
63.8
KC2.3
1 2/09/07
63.4
KC2.3
1 2/09/07
64.2
KC2.3
1 2/09/07
67.7
KC2.3
1 2/09/07
70.4
KC2.3
1 2/09/07
69.8
KC2.3
1 2/09/07
72.3
KC2.3
1 2/09/07
78.1
KC2.3
1 2/09/07
82
KC2.3
1 2/09/07
80
KC2.3
1 2/09/07
83.6
KC2.3
1 2/09/07
84.8
KC2.3
1 2/09/07
80.8
KC2.3
1 2/09/07
69.7
KC2.3
1 2/09/07
71.1
KC2.3
1 2/09/07
77.9
KC2.3
1 2/09/07
81.3
KC2.3
1 2/09/07
83.4
KC2.3
1 2/09/07
87.7
KC2.3
1 2/09/07
77.5
KC2.3
1 2/09/07
72.1
KC2.3
1 2/09/07
63.9
KC2.3
1 2/09/07
70.8
KC2.3
1 2/09/07
73.8
KC2.3
1 2/09/07
67.2
KC2.3
1 2/09/07
56.6
KC2.3
1 2/09/07
51.4
KC2.3
1 2/09/07
46
KC2.3
1 2/09/07
96.5
KC2.3
1 2/09/07
62.7
F-262

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/10/07
26.5
KC2.3
1 2/10/07
28.8
KC2.3
1 2/10/07
29.2
KC2.3
1 2/10/07
30.3
KC2.3
1 2/10/07
30.8
KC2.3
1 2/10/07
32.4
KC2.3
1 2/10/07
33.7
KC2.3
1 2/10/07
34.2
KC2.3
1 2/10/07
35.1
KC2.3
1 2/10/07
34.9
KC2.3
1 2/10/07
35.2
KC2.3
1 2/10/07
36.4
KC2.3
1 2/10/07
34.6
KC2.3
1 2/10/07
35.4
KC2.3
1 2/10/07
34.3
KC2.3
1 2/10/07
36.4
KC2.3
1 2/10/07
35.3
KC2.3
1 2/10/07
35.9
KC2.3
1 2/10/07
34.3
KC2.3
1 2/10/07
33.4
KC2.3
1 2/10/07
34.6
KC2.3
1 2/10/07
36.5
KC2.3
1 2/10/07
42.6
KC2.3
1 2/10/07
43.7
KC2.3
1 2/10/07
47
KC2.3
1 2/10/07
47.8
KC2.3
1 2/10/07
49.6
KC2.3
1 2/10/07
50
KC2.3
1 2/10/07
51.4
KC2.3
1 2/10/07
52
KC2.3
1 2/10/07
58
KC2.3
1 2/10/07
61.1
KC2.3
1 2/10/07
60.3
KC2.3
1 2/10/07
62.7
KC2.3
1 2/10/07
66.4
KC2.3
1 2/10/07
66.2
KC2.3
1 2/10/07
66.7
KC2.3
1 2/10/07
59.8
KC2.3
1 2/10/07
57.5
KC2.3
1 2/10/07
52.7
KC2.3
1 2/10/07
57.4
KC2.3
1 2/10/07
68.2
KC2.3
1 2/10/07
61.7
KC2.3
1 2/10/07
56.3
KC2.3
1 2/10/07
52.1
F-263

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/10/07
52.3
KC2.3
1 2/10/07
55.6
KC2.3
1 2/10/07
60.5
KC2.3
1 2/10/07
61.9
KC2.3
1 2/15/07
53.2
KC2.3
1 2/15/07
54.3
KC2.3
1 2/15/07
53.8
KC2.3
1 2/15/07
54.1
KC2.3
1 2/15/07
55
KC2.3
1 2/15/07
55.4
KC2.3
1 2/15/07
56.2
KC2.3
1 2/15/07
57.3
KC2.3
1 2/15/07
57.9
KC2.3
1 2/15/07
59.5
KC2.3
1 2/15/07
62.5
KC2.3
1 2/15/07
65
KC2.3
1 2/15/07
67.6
KC2.3
1 2/15/07
68.5
KC2.3
1 2/15/07
67.2
KC2.3
1 2/15/07
67
KC2.3
1 2/15/07
65.9
KC2.3
1 2/15/07
63.2
KC2.3
1 2/15/07
57.3
KC2.3
1 2/15/07
53.7
KC2.3
1 2/15/07
46.3
KC2.3
1 2/15/07
44.8
KC2.3
1 2/15/07
29.5
KC2.3
1 2/15/07
25.4
KC2.3
1 2/15/07
116.8
KC2.3
1 2/1 7/07
48.5
KC2.3
1 2/1 7/07
49
KC2.3
1 2/1 7/07
49.4
KC2.3
1 2/1 7/07
50.9
KC2.3
1 2/1 7/07
50
KC2.3
1 2/1 7/07
51.7
KC2.3
1 2/1 7/07
52.1
KC2.3
1 2/1 7/07
52.4
KC2.3
1 2/1 7/07
53
KC2.3
1 2/1 7/07
53.6
KC2.3
1 2/1 7/07
53.6
KC2.3
1 2/1 7/07
54.3
KC2.3
1 2/1 7/07
55.7
KC2.3
1 2/1 7/07
54.9
KC2.3
1 2/1 7/07
56.7
KC2.3
1 2/1 7/07
55.3
F-264

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/1 7/07
54.9
KC2.3
1 2/1 7/07
54
KC2.3
1 2/1 7/07
53.8
KC2.3
1 2/1 7/07
50.9
KC2.3
1 2/1 7/07
47.9
KC2.3
1 2/1 7/07
45
KC2.3
1 2/1 7/07
45.2
KC2.3
1 2/1 7/07
52.2
KC2.3
1 2/1 7/07
54.5
KC2.3
1 2/1 7/07
53.9
KC2.3
1 2/1 7/07
55.9
KC2.3
1 2/1 7/07
55.8
KC2.3
1 2/1 7/07
56.8
KC2.3
1 2/1 7/07
58.6
KC2.3
1 2/1 7/07
60.6
KC2.3
1 2/1 7/07
61.2
KC2.3
1 2/1 7/07
64.6
KC2.3
1 2/1 7/07
66.8
KC2.3
1 2/1 7/07
67.4
KC2.3
1 2/1 7/07
70.5
KC2.3
1 2/1 7/07
70.2
KC2.3
1 2/1 7/07
70.3
KC2.3
1 2/1 7/07
75.7
KC2.3
1 2/1 7/07
85.3
KC2.3
1 2/1 7/07
83.6
KC2.3
1 2/1 7/07
79.1
KC2.3
1 2/1 7/07
56.3
KC2.3
1 2/1 7/07
55.2
KC2.3
1 2/1 7/07
62.5
KC2.3
1 2/1 7/07
67.8
KC2.3
1 2/1 7/07
66.5
KC2.3
1 2/1 7/07
66.1
KC2.3
1 2/1 7/07
62.2
KC2.3
1 2/1 7/07
56.9
KC2.3
1 2/1 7/07
50
KC2.3
1 2/1 7/07
41.8
KC2.3
1 2/1 7/07
36.7
KC2.3
1 2/1 7/07
33.9
KC2.3
1 2/1 7/07
12.6
KC2.3
1 2/1 7/07
9.5
KC2.3
1 2/1 7/07
24.3
KC2.3
1 2/18/07
67.4
KC2.3
1 2/18/07
72.8
KC2.3
1 2/18/07
80.5
KC2.3
1 2/18/07
84.6
F-265

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/18/07
83.2
KC2.3
1 2/18/07
81.5
KC2.3
1 2/18/07
84.3
KC2.3
1 2/18/07
91.6
KC2.3
1 2/18/07
108.5
KC2.3
1 2/18/07
118.8
KC2.3
1 2/18/07
119.6
KC2.3
1 2/18/07
120.2
KC2.3
1 2/18/07
115
KC2.3
1 2/18/07
115.1
KC2.3
1 2/18/07
126.6
KC2.3
1 2/18/07
138
KC2.3
1 2/18/07
161.2
KC2.3
1 2/18/07
170.8
KC2.3
1 2/18/07
197.8
KC2.3
1 2/18/07
192.9
KC2.3
1 2/18/07
181.4
KC2.3
1 2/18/07
164
KC2.3
1 2/18/07
148.6
KC2.3
1 2/18/07
139.9
KC2.3
1 2/18/07
143.3
KC2.3
1 2/18/07
151.7
KC2.3
1 2/18/07
163.5
KC2.3
1 2/18/07
163.2
KC2.3
1 2/18/07
153.7
KC2.3
1 2/18/07
135
KC2.3
1 2/18/07
122.2
KC2.3
1 2/18/07
101.5
KC2.3
1 2/18/07
83.9
KC2.3
1 2/18/07
62.2
KC2.3
1 2/18/07
45.8
KC2.3
1 2/18/07
32.6
KC2.3
1 2/18/07
20.5
KC2.3
1 2/18/07
33.9
KC2.3
1 2/18/07
53.8
KC2.3
1 2/18/07
49.7
KC2.3
1 2/18/07
47.4
KC2.3
1 2/18/07
45
KC2.3
1 2/18/07
38.5
KC2.3
1 2/18/07
40.4
KC2.3
1 2/18/07
45.1
KC2.3
1 2/18/07
45.6
KC2.3
1 2/18/07
46
KC2.3
1 2/18/07
46.4
KC2.3
1 2/18/07
46.7
F-266

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/18/07
46.6
KC2.3
1 2/18/07
45.6
KC2.3
1 2/18/07
43.5
KC2.3
1 2/18/07
41.1
KC2.3
1 2/18/07
38.1
KC2.3
1 2/18/07
33.5
KC2.3
1 2/18/07
31.4
KC2.3
1 2/18/07
32.2
KC2.3
1 2/18/07
48.7
KC2.3
1 2/19/07
92.9
KC2.3
1 2/19/07
105.8
KC2.3
1 2/19/07
174.2
KC2.3
1 2/19/07
223.2
KC2.3
1 2/19/07
212.2
KC2.3
1 2/19/07
130.8
KC2.3
1 2/19/07
89.7
KC2.3
1 2/19/07
94.7
KC2.3
1 2/19/07
93.4
KC2.3
1 2/19/07
92.9
KC2.3
1 2/19/07
158.2
KC2.3
1 2/19/07
239.6
KC2.3
1 2/19/07
257.6
KC2.3
1 2/19/07
217.8
KC2.3
1 2/19/07
159.7
KC2.3
1 2/19/07
146.1
KC2.3
1 2/19/07
155.5
KC2.3
1 2/19/07
139.4
KC2.3
1 2/19/07
129.1
KC2.3
1 2/19/07
121.7
KC2.3
1 2/19/07
108.9
KC2.3
1 2/19/07
111.8
KC2.3
1 2/19/07
110.3
KC2.3
1 2/19/07
108.5
KC2.3
1 2/19/07
110.9
KC2.3
1 2/19/07
122
KC2.3
1 2/19/07
124.3
KC2.3
1 2/19/07
148.4
KC2.3
1 2/19/07
181.9
KC2.3
1 2/19/07
203.8
KC2.3
1 2/19/07
168.5
KC2.3
1 2/19/07
135.4
KC2.3
1 2/19/07
109.2
KC2.3
1 2/19/07
111.9
KC2.3
1 2/19/07
114.4
KC2.3
1 2/19/07
106.2
F-267

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/19/07
104.4
KC2.3
1 2/19/07
114
KC2.3
1 2/19/07
125.6
KC2.3
1 2/19/07
144.7
KC2.3
1 2/19/07
162
KC2.3
1 2/19/07
152
KC2.3
1 2/19/07
160.9
KC2.3
1 2/19/07
178.9
KC2.3
1 2/19/07
178.9
KC2.3
1 2/19/07
134.5
KC2.3
1 2/19/07
94.7
KC2.3
1 2/19/07
95.5
KC2.3
1 2/19/07
100
KC2.3
1 2/19/07
102.2
KC2.3
1 2/19/07
104.1
KC2.3
1 2/19/07
112.2
KC2.3
1 2/19/07
114.5
KC2.3
1 2/19/07
124
KC2.3
1 2/19/07
134.8
KC2.3
1 2/19/07
155.9
KC2.3
1 2/19/07
158
KC2.3
1 2/19/07
102.5
KC2.3
1 2/19/07
44.9
KC2.3
1 2/19/07
78.2
KC2.3
1 2/19/07
139.2
KC2.3
1 2/19/07
148.9
KC2.3
1 2/19/07
80
KC2.3
1 2/19/07
34.1
KC2.3
1 2/19/07
40.2
KC2.3
1 2/19/07
56.7
KC2.3
1 2/19/07
72.8
KC2.3
1 2/19/07
86.1
KC2.3
1 2/19/07
108.6
KC2.3
1 2/19/07
140.6
KC2.3
1 2/19/07
159.9
KC2.3
1 2/19/07
114.5
KC2.3
1 2/19/07
55
KC2.3
1 2/19/07
41.3
KC2.3
1 2/19/07
68.9
KC2.3
1 2/19/07
166.8
KC2.3
1 2/19/07
290
KC2.3
1 2/19/07
346.1
KC2.3
1 2/19/07
280
KC2.3
1 2/19/07
39.7
KC2.3
1 2/19/07
35
F-268

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/19/07
75.4
KC2.3
1 2/19/07
68.5
KC2.3
1 2/19/07
63.3
KC2.3
1 2/19/07
74
KC2.3
1 2/19/07
88.3
KC2.3
1 2/19/07
114.6
KC2.3
1 2/19/07
142
KC2.3
1 2/19/07
194.8
KC2.3
1 2/19/07
224.7
KC2.3
1 2/19/07
221.8
KC2.3
1 2/19/07
182.2
KC2.3
1 2/19/07
135.1
KC2.3
1 2/20/07
100.4
KC2.3
1 2/20/07
101.5
KC2.3
1 2/20/07
104.6
KC2.3
1 2/20/07
109.9
KC2.3
1 2/20/07
107.7
KC2.3
1 2/20/07
95.8
KC2.3
1 2/20/07
82.8
KC2.3
1 2/20/07
79.5
KC2.3
1 2/20/07
73.5
KC2.3
1 2/20/07
72.3
KC2.3
1 2/20/07
69.8
KC2.3
1 2/20/07
70.9
KC2.3
1 2/20/07
73.9
KC2.3
1 2/20/07
77.5
KC2.3
1 2/20/07
80.5
KC2.3
1 2/20/07
85.1
KC2.3
1 2/20/07
97.4
KC2.3
1 2/20/07
129.2
KC2.3
1 2/20/07
147
KC2.3
1 2/20/07
113.5
KC2.3
1 2/20/07
78.8
KC2.3
1 2/20/07
77.8
KC2.3
1 2/20/07
79.2
KC2.3
1 2/20/07
75.5
KC2.3
1 2/20/07
69.8
KC2.3
1 2/20/07
72
KC2.3
1 2/20/07
74.3
KC2.3
1 2/20/07
74.9
KC2.3
1 2/20/07
80.3
KC2.3
1 2/20/07
76.9
KC2.3
1 2/20/07
84.4
KC2.3
1 2/20/07
102.3
KC2.3
1 2/20/07
125.8
F-269

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/20/07
118
KC2.3
1 2/20/07
69
KC2.3
1 2/20/07
118.1
KC2.3
1 2/20/07
166.9
KC2.3
1 2/20/07
174.4
KC2.3
1 2/20/07
145.4
KC2.3
1 2/20/07
59.1
KC2.3
1 2/20/07
88.4
KC2.3
1 2/20/07
154.7
KC2.3
1 2/20/07
178.3
KC2.3
1 2/20/07
147.1
KC2.3
1 2/20/07
90.2
KC2.3
1 2/20/07
143.5
KC2.3
1 2/20/07
195.6
KC2.3
1 2/20/07
177.7
KC2.3
1 2/20/07
133.1
KC2.3
1 2/20/07
125
KC2.3
1 2/20/07
126.3
KC2.3
1 2/20/07
120.9
KC2.3
1 2/20/07
111.7
KC2.3
1 2/20/07
112.7
KC2.3
1 2/20/07
115.3
KC2.3
1 2/20/07
118.3
KC2.3
1 2/20/07
119
KC2.3
1 2/20/07
116.8
KC2.3
1 2/20/07
116.6
KC2.3
1 2/20/07
123.8
KC2.3
1 2/20/07
122.7
KC2.3
1 2/20/07
131.2
KC2.3
1 2/20/07
145.5
KC2.3
1 2/20/07
139.6
KC2.3
1 2/20/07
94.1
KC2.3
1 2/20/07
103.5
KC2.3
1 2/20/07
108.5
KC2.3
1 2/20/07
124.4
KC2.3
1 2/20/07
141.9
KC2.3
1 2/20/07
157
KC2.3
1 2/20/07
160.1
KC2.3
1 2/20/07
101.4
KC2.3
1 2/20/07
79.1
KC2.3
1 2/20/07
81.8
KC2.3
1 2/20/07
81.8
KC2.3
1 2/20/07
79.7
KC2.3
1 2/20/07
84
KC2.3
1 2/20/07
136.7
F-270

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/20/07
144
KC2.3
1 2/20/07
130.5
KC2.3
1 2/20/07
160.3
KC2.3
1 2/20/07
184.4
KC2.3
1 2/20/07
154.4
KC2.3
1 2/20/07
87.2
KC2.3
1 2/20/07
84.4
KC2.3
1 2/20/07
82.1
KC2.3
1 2/20/07
77.7
KC2.3
1 2/20/07
69.1
KC2.3
1 2/20/07
67.1
KC2.3
1 2/20/07
57.5
KC2.3
1 2/20/07
39.2
KC2.3
1 2/20/07
10.1
KC2.3
1 2/20/07
157.9
KC2.3
12/21/07
53.7
KC2.3
12/21/07
53.9
KC2.3
12/21/07
53.5
KC2.3
12/21/07
56.1
KC2.3
12/21/07
57.4
KC2.3
12/21/07
59.1
KC2.3
12/21/07
59.5
KC2.3
12/21/07
57.3
KC2.3
12/21/07
58.8
KC2.3
12/21/07
60.4
KC2.3
12/21/07
63.9
KC2.3
12/21/07
63.5
KC2.3
12/21/07
65.7
KC2.3
12/21/07
68.2
KC2.3
12/21/07
71.8
KC2.3
12/21/07
72
KC2.3
12/21/07
70.8
KC2.3
12/21/07
71.4
KC2.3
12/21/07
70.4
KC2.3
12/21/07
71.7
KC2.3
12/21/07
70.9
KC2.3
12/21/07
69.8
KC2.3
12/21/07
70.7
KC2.3
12/21/07
71.9
KC2.3
12/21/07
71.2
KC2.3
12/21/07
71.5
KC2.3
12/21/07
70.7
KC2.3
12/21/07
70.8
KC2.3
12/21/07
71.7
KC2.3
12/21/07
71.5
F-271

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
12/21/07
71.4
KC2.3
12/21/07
72.1
KC2.3
12/21/07
71.2
KC2.3
12/21/07
69.1
KC2.3
12/21/07
68.5
KC2.3
12/21/07
68.5
KC2.3
12/21/07
69.5
KC2.3
12/21/07
62.4
KC2.3
12/21/07
70.7
KC2.3
12/21/07
80.3
KC2.3
12/21/07
85.3
KC2.3
12/21/07
77.1
KC2.3
12/21/07
71.6
KC2.3
12/21/07
72.1
KC2.3
12/21/07
80.4
KC2.3
12/21/07
93.5
KC2.3
12/21/07
107.4
KC2.3
12/21/07
112
KC2.3
12/21/07
77.7
KC2.3
12/21/07
70.3
KC2.3
12/21/07
67.4
KC2.3
12/21/07
66.6
KC2.3
12/21/07
68.8
KC2.3
12/21/07
74.5
KC2.3
12/21/07
86.2
KC2.3
12/21/07
102.4
KC2.3
12/21/07
120.2
KC2.3
12/21/07
122.5
KC2.3
12/21/07
88.4
KC2.3
12/21/07
76.7
KC2.3
12/21/07
64.1
KC2.3
12/21/07
43.6
KC2.3
12/21/07
40.4
KC2.3
12/21/07
109.8
KC2.3
12/21/07
105.6
KC2.3
12/22/07
68.5
KC2.3
12/22/07
73.4
KC2.3
12/22/07
60.5
KC2.3
12/22/07
53.9
KC2.3
12/22/07
53.8
KC2.3
12/22/07
55.5
KC2.3
12/22/07
61.6
KC2.3
12/22/07
73.6
KC2.3
12/22/07
94.8
KC2.3
12/22/07
107
F-272

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
12/22/07
107.6
KC2.3
12/22/07
95.8
KC2.3
12/22/07
92.3
KC2.3
12/22/07
73.5
KC2.3
12/22/07
74.7
KC2.3
12/22/07
72.4
KC2.3
12/22/07
84.4
KC2.3
12/22/07
112.7
KC2.3
12/22/07
140.3
KC2.3
12/22/07
135.3
KC2.3
12/22/07
100.4
KC2.3
12/22/07
78.8
KC2.3
12/22/07
74.3
KC2.3
12/22/07
78.9
KC2.3
12/22/07
112.7
KC2.3
12/22/07
151.6
KC2.3
12/22/07
167.8
KC2.3
12/22/07
128.5
KC2.3
12/22/07
115.3
KC2.3
12/22/07
132
KC2.3
12/22/07
155.1
KC2.3
12/22/07
159.9
KC2.3
12/22/07
154.1
KC2.3
12/22/07
151.6
KC2.3
12/22/07
147.4
KC2.3
12/22/07
139.4
KC2.3
12/22/07
123.7
KC2.3
12/22/07
111.7
KC2.3
12/22/07
102.4
KC2.3
12/22/07
98.8
KC2.3
12/22/07
98.1
KC2.3
12/22/07
106.2
KC2.3
12/22/07
121.4
KC2.3
12/22/07
108
KC2.3
12/22/07
67.8
KC2.3
12/22/07
49.8
KC2.3
12/22/07
59.3
KC2.3
12/22/07
77.5
KC2.3
12/22/07
100.1
KC2.3
12/22/07
95
KC2.3
12/22/07
60.2
KC2.3
12/22/07
74.3
KC2.3
12/23/07
40.5
KC2.3
12/23/07
41.3
KC2.3
12/23/07
39.9
F-273

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
12/23/07
40.9
KC2.3
12/23/07
40.5
KC2.3
12/23/07
41.2
KC2.3
12/23/07
40
KC2.3
12/23/07
40.1
KC2.3
12/23/07
40.8
KC2.3
12/23/07
41.6
KC2.3
12/23/07
45.9
KC2.3
12/23/07
47.4
KC2.3
12/23/07
50.1
KC2.3
12/23/07
48.8
KC2.3
12/23/07
48.5
KC2.3
12/23/07
48
KC2.3
12/23/07
45.7
KC2.3
12/23/07
46
KC2.3
12/23/07
49.4
KC2.3
12/23/07
63
KC2.3
12/23/07
70.7
KC2.3
12/23/07
53.6
KC2.3
12/23/07
36.7
KC2.3
12/23/07
30.9
KC2.3
12/23/07
35.3
KC2.3
12/23/07
55.6
KC2.3
1 2/24/07
76.9
KC2.3
1 2/24/07
57.9
KC2.3
1 2/26/07
55.7
KC2.3
1 2/26/07
46.7
KC2.3
1 2/26/07
48.3
KC2.3
1 2/26/07
53.5
KC2.3
1 2/26/07
63.6
KC2.3
1 2/26/07
66.3
KC2.3
1 2/26/07
61.4
KC2.3
1 2/26/07
52.6
KC2.3
1 2/26/07
53.1
KC2.3
1 2/26/07
50.2
KC2.3
1 2/26/07
50.2
KC2.3
1 2/26/07
52.8
KC2.3
1 2/26/07
60.2
KC2.3
1 2/26/07
74
KC2.3
1 2/26/07
84.9
KC2.3
1 2/26/07
80.7
KC2.3
1 2/26/07
108.4
KC2.3
1 2/26/07
11
KC2.3
12/27/07
51.7
KC2.3
12/27/07
62.2
F-274

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
12/27/07
69.5
KC2.3
12/27/07
59.8
KC2.3
12/27/07
51.7
KC2.3
12/27/07
51.8
KC2.3
12/27/07
56.9
KC2.3
12/27/07
67.4
KC2.3
12/27/07
81.4
KC2.3
12/27/07
80.3
KC2.3
12/27/07
92.3
KC2.3
12/27/07
146.9
KC2.3
12/27/07
243.8
KC2.3
12/27/07
125
KC2.3
12/27/07
76.6
KC2.3
12/27/07
70.3
KC2.3
12/27/07
62.7
KC2.3
12/27/07
58.5
KC2.3
12/27/07
61
KC2.3
12/27/07
77.2
KC2.3
12/27/07
7
KC2.3
12/27/07
6.7
KC2.3
12/27/07
8.3
KC2.3
12/27/07
166.1
KC2.3
1 2/28/07
48.7
KC2.3
1 2/28/07
54
KC2.3
1 2/28/07
48.6
KC2.3
1 2/28/07
45.6
KC2.3
1 2/28/07
44.7
KC2.3
1 2/28/07
46.3
KC2.3
1 2/28/07
54
KC2.3
1 2/28/07
80.6
KC2.3
1 2/28/07
101.2
KC2.3
1 2/28/07
58.6
KC2.3
1 2/28/07
53.4
KC2.3
1 2/28/07
52.1
KC2.3
1 2/28/07
54.8
KC2.3
1 2/28/07
50
KC2.3
1 2/28/07
51.5
KC2.3
1 2/28/07
49.7
KC2.3
1 2/28/07
48
KC2.3
1 2/28/07
49.6
KC2.3
1 2/28/07
46.5
KC2.3
1 2/28/07
44.9
KC2.3
1 2/28/07
48.7
KC2.3
1 2/28/07
46.2
KC2.3
1 2/28/07
43.9
F-275

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/28/07
45.7
KC2.3
1 2/28/07
42.1
KC2.3
1 2/28/07
41.5
KC2.3
1 2/28/07
39.7
KC2.3
1 2/28/07
40.9
KC2.3
1 2/28/07
45.6
KC2.3
1 2/28/07
49.1
KC2.3
1 2/28/07
46.5
KC2.3
1 2/28/07
48
KC2.3
1 2/28/07
44.9
KC2.3
1 2/28/07
39.9
KC2.3
1 2/28/07
35.6
KC2.3
1 2/28/07
25.9
KC2.3
1 2/28/07
21.1
KC2.3
1 2/28/07
14.3
KC2.3
1 2/28/07
27.6
KC2.3
1 2/28/07
46.5
KC2.3
1 2/28/07
49.4
KC2.3
1 2/28/07
49.2
KC2.3
1 2/28/07
46.3
KC2.3
1 2/28/07
43.9
KC2.3
1 2/28/07
43.8
KC2.3
1 2/28/07
42.5
KC2.3
1 2/28/07
45.4
KC2.3
1 2/28/07
52.9
KC2.3
1 2/28/07
61.3
KC2.3
1 2/28/07
53.5
KC2.3
1 2/28/07
45.8
KC2.3
1 2/28/07
45.1
KC2.3
1 2/28/07
48.7
KC2.3
1 2/28/07
56.8
KC2.3
1 2/28/07
66
KC2.3
1 2/28/07
68.3
KC2.3
1 2/28/07
60.8
KC2.3
1 2/28/07
53.5
KC2.3
1 2/28/07
48.7
KC2.3
1 2/28/07
47.9
KC2.3
1 2/28/07
46.2
KC2.3
1 2/28/07
45.7
KC2.3
1 2/28/07
47.2
KC2.3
1 2/28/07
51.7
KC2.3
1 2/28/07
56.7
KC2.3
1 2/28/07
46.8
KC2.3
1 2/28/07
30
KC2.3
1 2/28/07
24.7
F-276

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/28/07
48.2
KC2.3
1 2/29/07
44.8
KC2.3
1 2/29/07
46.8
KC2.3
1 2/29/07
42.3
KC2.3
1 2/29/07
39.2
KC2.3
1 2/29/07
35.6
KC2.3
1 2/29/07
34.2
KC2.3
1 2/29/07
39.9
KC2.3
1 2/29/07
50.1
KC2.3
1 2/29/07
67.3
KC2.3
1 2/29/07
145.6
KC2.3
1 2/29/07
115.1
KC2.3
1 2/29/07
37.4
KC2.3
1 2/29/07
39.7
KC2.3
1 2/29/07
46
KC2.3
1 2/29/07
45.9
KC2.3
1 2/29/07
45.1
KC2.3
1 2/29/07
45.2
KC2.3
1 2/29/07
46.1
KC2.3
1 2/29/07
46.7
KC2.3
1 2/29/07
49.1
KC2.3
1 2/29/07
45.1
KC2.3
1 2/29/07
41.7
KC2.3
1 2/29/07
39.1
KC2.3
1 2/29/07
43.2
KC2.3
1 2/29/07
45.6
KC2.3
1 2/29/07
44.1
KC2.3
1 2/29/07
43.5
KC2.3
1 2/29/07
44
KC2.3
1 2/29/07
44.2
KC2.3
1 2/29/07
46.6
KC2.3
1 2/29/07
46
KC2.3
1 2/29/07
45.5
KC2.3
1 2/29/07
47.8
KC2.3
1 2/29/07
45.5
KC2.3
1 2/29/07
44.2
KC2.3
1 2/29/07
42.7
KC2.3
1 2/29/07
42.8
KC2.3
1 2/29/07
43.5
KC2.3
1 2/29/07
44
KC2.3
1 2/29/07
44.3
KC2.3
1 2/29/07
44.7
KC2.3
1 2/29/07
44.8
KC2.3
1 2/29/07
47.7
KC2.3
1 2/29/07
43.7
F-277

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
1 2/29/07
40.1
KC2.3
1 2/29/07
36.6
KC2.3
1 2/29/07
30.7
KC2.3
1 2/29/07
25
KC2.3
1 2/29/07
34.1
KC2.3
1 2/29/07
47.4
KC2.3
01/02/08
17.7
KC2.3
01/02/08
12
KC2.3
01/02/08
12.7
KC2.3
01/02/08
13.5
KC2.3
01/02/08
15.7
KC2.3
01/02/08
20.2
KC2.3
01/02/08
22.1
KC2.3
01/02/08
21.6
KC2.3
01/02/08
21
KC2.3
01/02/08
20.9
KC2.3
01/02/08
20.7
KC2.3
01/02/08
20.6
KC2.3
01/02/08
20.2
KC2.3
01/02/08
20
KC2.3
01/02/08
20
KC2.3
01/02/08
20
KC2.3
01/02/08
20
KC2.3
01/02/08
20.1
KC2.3
01/02/08
21.6
KC2.3
01/02/08
23.8
KC2.3
01/02/08
24.9
KC2.3
01/02/08
26.5
KC2.3
01/02/08
26.3
KC2.3
01/02/08
26.4
KC2.3
01/02/08
27.7
KC2.3
01/02/08
27.7
KC2.3
01/02/08
28.8
KC2.3
01/02/08
28.6
KC2.3
01/02/08
31.4
KC2.3
01/02/08
32
KC2.3
01/02/08
32
KC2.3
01/02/08
34.2
KC2.3
01/02/08
34.5
KC2.3
01/02/08
35.4
KC2.3
01/02/08
35.4
KC2.3
01/02/08
33.9
KC2.3
01/02/08
33.7
KC2.3
01/02/08
35.5
KC2.3
01/02/08
34.4
F-278

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/02/08
34.1
KC2.3
01/02/08
35
KC2.3
01/02/08
35.4
KC2.3
01/02/08
35.8
KC2.3
01/02/08
37.2
KC2.3
01/03/08
5.7
KC2.3
01/03/08
24
KC2.3
01/03/08
22
KC2.3
01/03/08
23.6
KC2.3
01/03/08
24.9
KC2.3
01/03/08
24.1
KC2.3
01/03/08
23.2
KC2.3
01/03/08
22.5
KC2.3
01/03/08
21.7
KC2.3
01/03/08
21.2
KC2.3
01/03/08
21.5
KC2.3
01/03/08
21.8
KC2.3
01/03/08
22
KC2.3
01/03/08
21.7
KC2.3
01/03/08
21.2
KC2.3
01/03/08
21.2
KC2.3
01/03/08
20.9
KC2.3
01/03/08
21.3
KC2.3
01/03/08
21.8
KC2.3
01/03/08
22.5
KC2.3
01/03/08
22.4
KC2.3
01/03/08
22.8
KC2.3
01/03/08
22.7
KC2.3
01/03/08
23
KC2.3
01/04/08
31.4
KC2.3
01/04/08
31.8
KC2.3
01/04/08
31.8
KC2.3
01/04/08
33
KC2.3
01/04/08
34
KC2.3
01/04/08
34.5
KC2.3
01/04/08
35.1
KC2.3
01/04/08
35
KC2.3
01/04/08
34.8
KC2.3
01/04/08
34.8
KC2.3
01/05/08
21.8
KC2.3
01/05/08
32.2
KC2.3
01/05/08
31.7
KC2.3
01/05/08
31.2
KC2.3
01/05/08
30.4
KC2.3
01/05/08
30.8
F-279

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/05/08
31.5
KC2.3
01/05/08
32.8
KC2.3
01/05/08
33.4
KC2.3
01/05/08
33.2
KC2.3
01/05/08
33.2
KC2.3
01/05/08
33.5
KC2.3
01/05/08
35.4
KC2.3
01/05/08
38.3
KC2.3
01/05/08
40.7
KC2.3
01/05/08
41.3
KC2.3
01/07/08
31.4
KC2.3
01/07/08
26.4
KC2.3
01/07/08
28.2
KC2.3
01/07/08
26.8
KC2.3
01/07/08
25.6
KC2.3
01/07/08
23.9
KC2.3
01/07/08
23.5
KC2.3
01/07/08
23.7
KC2.3
01/07/08
22.2
KC2.3
01/07/08
22.6
KC2.3
01/07/08
22.5
KC2.3
01/07/08
21.7
KC2.3
01/07/08
21.7
KC2.3
01/07/08
20.2
KC2.3
01/07/08
19.6
KC2.3
01/07/08
19.1
KC2.3
01/07/08
19.8
KC2.3
01/07/08
19.9
KC2.3
01/07/08
20
KC2.3
01/07/08
20.2
KC2.3
01/07/08
20
KC2.3
01/07/08
19.9
KC2.3
01/07/08
21.4
KC2.3
01/07/08
21.3
KC2.3
01/07/08
22.7
KC2.3
01/07/08
22.5
KC2.3
01/07/08
22.6
KC2.3
01/07/08
22.2
KC2.3
01/07/08
21.5
KC2.3
01/07/08
20.7
KC2.3
01/07/08
20
KC2.3
01/07/08
18.9
KC2.3
01/07/08
19.2
KC2.3
01/08/08
18.6
KC2.3
01/08/08
14.7
F-280

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/08/08
16
KC2.3
01/08/08
18
KC2.3
01/08/08
18.4
KC2.3
01/08/08
19
KC2.3
01/08/08
18.9
KC2.3
01/08/08
18.9
KC2.3
01/08/08
18.7
KC2.3
01/08/08
18.1
KC2.3
01/08/08
18.4
KC2.3
01/08/08
18.9
KC2.3
01/08/08
18.5
KC2.3
01/08/08
17.9
KC2.3
01/08/08
17.7
KC2.3
01/08/08
17.3
KC2.3
01/08/08
17.3
KC2.3
01/08/08
19.5
KC2.3
01/08/08
20.9
KC2.3
01/08/08
20.6
KC2.3
01/08/08
20.8
KC2.3
01/08/08
20.3
KC2.3
01/08/08
20.5
KC2.3
01/08/08
21
KC2.3
01/08/08
21.1
KC2.3
01/08/08
20.9
KC2.3
01/08/08
20.8
KC2.3
01/08/08
22.6
KC2.3
01/08/08
22
KC2.3
01/08/08
22
KC2.3
01/08/08
21.6
KC2.3
01/08/08
21.5
KC2.3
01/08/08
22.1
KC2.3
01/08/08
22.3
KC2.3
01/08/08
21.3
KC2.3
01/08/08
21.5
KC2.3
01/08/08
22.9
KC2.3
01/08/08
23.8
KC2.3
01/08/08
23.2
KC2.3
01/08/08
23
KC2.3
01/08/08
23.1
KC2.3
01/08/08
22.8
KC2.3
01/08/08
22.6
KC2.3
01/08/08
22.4
KC2.3
01/08/08
22.7
KC2.3
01/08/08
23
KC2.3
01/08/08
23
F-281

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/08/08
22.6
KC2.3
01/08/08
23
KC2.3
01/08/08
22.9
KC2.3
01/08/08
23.1
KC2.3
01/08/08
23.5
KC2.3
01/08/08
24.1
KC2.3
01/08/08
24.1
KC2.3
01/08/08
25
KC2.3
01/08/08
25.6
KC2.3
01/08/08
26.6
KC2.3
01/08/08
27.2
KC2.3
01/08/08
28.1
KC2.3
01/08/08
28.5
KC2.3
01/08/08
28.8
KC2.3
01/08/08
29.6
KC2.3
01/08/08
30
KC2.3
01/08/08
30.9
KC2.3
01/08/08
30.7
KC2.3
01/08/08
31.1
KC2.3
01/08/08
31.4
KC2.3
01/08/08
31.7
KC2.3
01/08/08
31.9
KC2.3
01/08/08
31.6
KC2.3
01/09/08
32.8
KC2.3
01/09/08
32.7
KC2.3
01/09/08
29.5
KC2.3
01/09/08
24.3
KC2.3
01/09/08
21
KC2.3
01/09/08
22.5
KC2.3
01/09/08
23.1
KC2.3
01/09/08
23.6
KC2.3
01/09/08
23.6
KC2.3
01/09/08
23.6
KC2.3
01/09/08
24.3
KC2.3
01/09/08
27.5
KC2.3
01/09/08
23.6
KC2.3
01/09/08
25.1
KC2.3
01/09/08
27.4
KC2.3
01/09/08
29.8
KC2.3
01/10/08
29
KC2.3
01/10/08
34.8
KC2.3
01/10/08
31.5
KC2.3
01/10/08
33.2
KC2.3
01/10/08
36.2
KC2.3
01/10/08
37.3
F-282

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/10/08
38.4
KC2.3
01/10/08
39.2
KC2.3
01/10/08
38.4
KC2.3
01/10/08
37.1
KC2.3
01/10/08
37.1
KC2.3
01/10/08
37.3
KC2.3
01/10/08
40.5
KC2.3
01/10/08
41.3
KC2.3
01/10/08
43.6
KC2.3
01/10/08
43.1
KC2.3
01/10/08
44.2
KC2.3
01/10/08
44
KC2.3
01/10/08
46
KC2.3
01/10/08
47.4
KC2.3
01/10/08
47.1
KC2.3
01/10/08
48.5
KC2.3
01/10/08
48.8
KC2.3
01/10/08
48.9
KC2.3
01/10/08
48.3
KC2.3
01/10/08
49.8
KC2.3
01/10/08
50.8
KC2.3
01/10/08
51.2
KC2.3
01/10/08
51.2
KC2.3
01/10/08
51
KC2.3
01/10/08
50.2
KC2.3
01/10/08
49.2
KC2.3
01/10/08
49.4
KC2.3
01/10/08
50.5
KC2.3
01/10/08
52
KC2.3
01/10/08
50.3
KC2.3
01/10/08
51
KC2.3
01/10/08
49.3
KC2.3
01/10/08
48.8
KC2.3
01/10/08
48.4
KC2.3
01/10/08
46.9
KC2.3
01/10/08
46.8
KC2.3
01/10/08
45.7
KC2.3
01/10/08
45.5
KC2.3
01/10/08
46.5
KC2.3
01/10/08
48.8
KC2.3
01/10/08
49.3
KC2.3
01/10/08
49.3
KC2.3
01/10/08
48.7
KC2.3
01/10/08
50.5
KC2.3
01/10/08
50.9
F-283

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/10/08
50
KC2.3
01/10/08
49
KC2.3
01/10/08
48.4
KC2.3
01/10/08
48.7
KC2.3
01/10/08
50.6
KC2.3
01/10/08
52.4
KC2.3
01/10/08
53.1
KC2.3
01/10/08
53
KC2.3
01/10/08
193.7
KC2.3
01/10/08
54.7
KC2.3
01/10/08
47
KC2.3
01/10/08
53
KC2.3
01/10/08
56.6
KC2.3
01/10/08
58.5
KC2.3
01/10/08
59.7
KC2.3
01/10/08
60
KC2.3
01/10/08
62.5
KC2.3
01/10/08
64.1
KC2.3
01/10/08
65.5
KC2.3
01/10/08
67.9
KC2.3
01/10/08
69.5
KC2.3
01/10/08
71.9
KC2.3
01/10/08
71.7
KC2.3
01/10/08
72.2
KC2.3
01/10/08
73.1
KC2.3
01/10/08
75.1
KC2.3
01/10/08
75.7
KC2.3
01/10/08
75.5
KC2.3
01/10/08
74.7
KC2.3
01/10/08
75.2
KC2.3
01/10/08
76.1
KC2.3
01/11/08
76
KC2.3
01/11/08
73.2
KC2.3
01/11/08
49.5
KC2.3
01/11/08
50.7
KC2.3
01/11/08
53.3
KC2.3
01/11/08
55.8
KC2.3
01/11/08
55.5
KC2.3
01/11/08
54.5
KC2.3
01/11/08
52.9
KC2.3
01/11/08
50.8
KC2.3
01/11/08
49.7
KC2.3
01/11/08
51.5
KC2.3
01/11/08
52.3
KC2.3
01/11/08
50.9
F-284

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/11/08
51
KC2.3
01/11/08
51.9
KC2.3
01/11/08
51.2
KC2.3
01/11/08
50.1
KC2.3
01/11/08
49
KC2.3
01/11/08
49
KC2.3
01/11/08
55.8
KC2.3
01/11/08
50.6
KC2.3
01/11/08
49
KC2.3
01/11/08
47.7
KC2.3
01/11/08
47.9
KC2.3
01/11/08
48.9
KC2.3
01/11/08
47.8
KC2.3
01/11/08
46.5
KC2.3
01/11/08
46.8
KC2.3
01/11/08
44.8
KC2.3
01/11/08
43.8
KC2.3
01/11/08
45
KC2.3
01/11/08
45.6
KC2.3
01/11/08
46.3
KC2.3
01/11/08
46.2
KC2.3
01/11/08
45.1
KC2.3
01/11/08
47.6
KC2.3
01/11/08
46.3
KC2.3
01/11/08
47.2
KC2.3
01/11/08
47.7
KC2.3
01/11/08
46.4
KC2.3
01/11/08
46.7
KC2.3
01/11/08
47.9
KC2.3
01/11/08
49.8
KC2.3
01/11/08
49.6
KC2.3
01/11/08
49.5
KC2.3
01/11/08
48.5
KC2.3
01/11/08
46.7
KC2.3
01/11/08
47.5
KC2.3
01/11/08
47.7
KC2.3
01/11/08
47.3
KC2.3
01/11/08
46.8
KC2.3
01/11/08
44.9
KC2.3
01/11/08
45
KC2.3
01/11/08
44.8
KC2.3
01/11/08
44.9
KC2.3
01/11/08
44.7
KC2.3
01/11/08
44.6
KC2.3
01/11/08
44.6
F-285

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/11/08
45.5
KC2.3
01/1 2/08
26.5
KC2.3
01/1 2/08
30
KC2.3
01/1 2/08
34.4
KC2.3
01/1 2/08
39.7
KC2.3
01/1 2/08
44
KC2.3
01/1 2/08
49.2
KC2.3
01/1 2/08
56.5
KC2.3
01/1 2/08
63.4
KC2.3
01/1 2/08
67.8
KC2.3
01/1 2/08
70.2
KC2.3
01/1 2/08
73.5
KC2.3
01/1 2/08
75.3
KC2.3
01/1 2/08
77.3
KC2.3
01/1 2/08
79.4
KC2.3
01/1 2/08
83.3
KC2.3
01/1 2/08
82.2
KC2.3
01/1 2/08
83.5
KC2.3
01/1 2/08
83.7
KC2.3
01/1 2/08
84.5
KC2.3
01/1 2/08
82.9
KC2.3
01/1 2/08
85.6
KC2.3
01/1 2/08
87.9
KC2.3
01/1 2/08
87.5
KC2.3
01/1 2/08
86.7
KC2.3
01/1 2/08
87.2
KC2.3
01/1 2/08
CO
CO
CO
KC2.3
01/1 2/08
90.7
KC2.3
01/1 2/08
91.7
KC2.3
01/1 2/08
92
KC2.3
01/1 2/08
91.6
KC2.3
01/1 2/08
90
KC2.3
01/1 2/08
90.7
KC2.3
01/1 2/08
91.8
KC2.3
01/1 2/08
95.1
KC2.3
01/1 2/08
94.5
KC2.3
01/1 2/08
93.5
KC2.3
01/1 2/08
93.7
KC2.3
01/1 2/08
91.4
KC2.3
01/1 2/08
93.2
KC2.3
01/1 2/08
95.2
KC2.3
01/1 2/08
97
KC2.3
01/1 2/08
95.3
KC2.3
01/1 2/08
94.3
KC2.3
01/1 2/08
92.6
F-286

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/1 2/08
90.7
KC2.3
01/1 2/08
90.9
KC2.3
01/1 2/08
89.5
KC2.3
01/1 2/08
87.3
KC2.3
01/1 2/08
86.6
KC2.3
01/14/08
62.3
KC2.3
01/14/08
44.5
KC2.3
01/14/08
42.9
KC2.3
01/14/08
42.6
KC2.3
01/14/08
43.3
KC2.3
01/14/08
43.9
KC2.3
01/14/08
44.9
KC2.3
01/14/08
47.9
KC2.3
01/14/08
48.1
KC2.3
01/14/08
48.9
KC2.3
01/14/08
49.2
KC2.3
01/14/08
49.8
KC2.3
01/14/08
50.6
KC2.3
01/14/08
51
KC2.3
01/14/08
51.7
KC2.3
01/14/08
51.9
KC2.3
01/14/08
51.3
KC2.3
01/14/08
52
KC2.3
01/14/08
52.3
KC2.3
01/14/08
52
KC2.3
01/14/08
50.3
KC2.3
01/14/08
49
KC2.3
01/14/08
51
KC2.3
01/20/08
54.6
KC2.3
01/20/08
36.3
KC2.3
01/20/08
40.2
KC2.3
01/20/08
52.6
KC2.3
01/20/08
50.5
KC2.3
01/20/08
55
KC2.3
01/20/08
58.9
KC2.3
01/20/08
56.9
KC2.3
01/20/08
53.3
KC2.3
01/21/08
58.7
KC2.3
01/21/08
60
KC2.3
01/26/08
24.6
KC2.3
01/26/08
35.6
KC2.3
01/26/08
60.6
KC2.3
01/26/08
31
KC2.3
01/26/08
29.7
KC2.3
01/26/08
29.6
F-287

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/26/08
26.7
KC2.3
01/26/08
28.5
KC2.3
01/26/08
29.2
KC2.3
01/26/08
28.1
KC2.3
01/26/08
29.5
KC2.3
01/26/08
34.2
KC2.3
01/26/08
38.1
KC2.3
01/26/08
40.1
KC2.3
01/26/08
44.4
KC2.3
01/26/08
44.5
KC2.3
01/26/08
46.1
KC2.3
01/26/08
46.4
KC2.3
01/26/08
47.8
KC2.3
01/26/08
48.1
KC2.3
01/26/08
50.9
KC2.3
01/26/08
52.6
KC2.3
01/26/08
53
KC2.3
01/26/08
53.3
KC2.3
01/26/08
53.7
KC2.3
01/26/08
53.3
KC2.3
01/26/08
53.8
KC2.3
01/26/08
53.9
KC2.3
01/26/08
50.1
KC2.3
01/27/08
50.5
KC2.3
01/27/08
49.6
KC2.3
01/27/08
116.7
KC2.3
01/27/08
58.7
KC2.3
01/27/08
59.9
KC2.3
01/27/08
60.7
KC2.3
01/27/08
67.7
KC2.3
01/27/08
69.5
KC2.3
01/27/08
70.2
KC2.3
01/27/08
67.2
KC2.3
01/27/08
70.6
KC2.3
01/27/08
71.1
KC2.3
01/27/08
71.4
KC2.3
01/27/08
66.3
KC2.3
01/27/08
68.3
KC2.3
01/27/08
67.9
KC2.3
01/27/08
65.1
KC2.3
01/27/08
62.9
KC2.3
01/27/08
57.8
KC2.3
01/28/08
39.2
KC2.3
01/28/08
36.5
KC2.3
01/28/08
43.1
F-288

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/28/08
51.9
KC2.3
01/28/08
44.4
KC2.3
01/28/08
43.7
KC2.3
01/28/08
45.8
KC2.3
01/28/08
48.1
KC2.3
01/28/08
51.7
KC2.3
01/28/08
53
KC2.3
01/28/08
53.6
KC2.3
01/28/08
53.7
KC2.3
01/28/08
54.3
KC2.3
01/28/08
54.1
KC2.3
01/28/08
57.1
KC2.3
01/28/08
58.4
KC2.3
01/28/08
54.3
KC2.3
01/28/08
51.1
KC2.3
01/28/08
50.2
KC2.3
01/28/08
51.3
KC2.3
01/28/08
50
KC2.3
01/29/08
47.9
KC2.3
01/29/08
47.8
KC2.3
01/29/08
70.4
KC2.3
01/29/08
51.9
KC2.3
01/29/08
51.7
KC2.3
01/29/08
49.3
KC2.3
01/29/08
45.4
KC2.3
01/29/08
43.5
KC2.3
01/29/08
44.3
KC2.3
01/29/08
43.5
KC2.3
01/29/08
43.9
KC2.3
01/29/08
41.9
KC2.3
01/29/08
40.5
KC2.3
01/29/08
43.5
KC2.3
01/29/08
40.6
KC2.3
01/29/08
44.5
KC2.3
01/29/08
45.2
KC2.3
01/29/08
45.4
KC2.3
01/29/08
44
KC2.3
01/29/08
43.4
KC2.3
01/29/08
42.6
KC2.3
01/29/08
41.4
KC2.3
01/29/08
42.8
KC2.3
01/29/08
29
KC2.3
01/29/08
45.6
KC2.3
01/29/08
42.3
KC2.3
01/29/08
46
F-289

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.3
01/29/08
45.9
KC2.3
01/29/08
48.5
KC2.3
01/29/08
48.9
KC2.3
01/29/08
49.7
KC2.3
01/29/08
50.7
KC2.3
01/29/08
49.4
KC2.3
01/29/08
53.3
KC2.3
01/29/08
56
KC2.3
01/29/08
58.2
KC2.3
01/29/08
58.9
KC2.3
01/29/08
64.3
KC2.3
01/31/08
44.8
KC2.3
01/31/08
37.6
KC2.3
01/31/08
34.9
KC2.3
01/31/08
30.8
KC2.3
01/31/08
51
KC2.3
01/31/08
69.2
KC2.3
01/31/08
66.8
KC2.3
01/31/08
74.2
KC2.3
01/31/08
71
KC2.3
01/31/08
69.8
KC2.3
01/31/08
67.5
KC2.3
01/31/08
67.6
KC2.3
01/31/08
67.6
KC2.3
01/31/08
66.6
KC2.3
01/31/08
71.1
KC2.3
01/31/08
76.3
KC2.3
01/31/08
71.7
KC2.3
01/31/08
68.8
KC2.3
01/31/08
71.2
KC2.3
01/31/08
69.9
KC2.3
01/31/08
72.4
KC2.3
01/31/08
73.3
KC2.3
01/31/08
78.4
KC2.3
01/31/08
75.9
KC2.4
1 2/02/07
71.2
KC2.4
1 2/02/07
70.8
KC2.4
1 2/02/07
69.8
KC2.4
1 2/02/07
67.3
KC2.4
1 2/02/07
64.5
KC2.4
1 2/02/07
71.5
KC2.4
1 2/02/07
101.6
KC2.4
1 2/02/07
123.2
KC2.4
1 2/02/07
125.7
KC2.4
1 2/02/07
127.3
F-290

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/02/07
119.6
KC2.4
1 2/02/07
95.7
KC2.4
1 2/02/07
82
KC2.4
1 2/02/07
80.7
KC2.4
1 2/02/07
79.5
KC2.4
1 2/02/07
84
KC2.4
1 2/02/07
106.5
KC2.4
1 2/02/07
138.5
KC2.4
1 2/02/07
146.8
KC2.4
1 2/02/07
139.3
KC2.4
1 2/02/07
103
KC2.4
1 2/02/07
98.3
KC2.4
1 2/02/07
101.4
KC2.4
1 2/02/07
103.2
KC2.4
1 2/02/07
120.8
KC2.4
1 2/02/07
150.8
KC2.4
1 2/02/07
136.3
KC2.4
1 2/02/07
109.4
KC2.4
1 2/02/07
107.6
KC2.4
1 2/02/07
97.4
KC2.4
1 2/02/07
121.9
KC2.4
1 2/02/07
150.2
KC2.4
1 2/02/07
129.7
KC2.4
1 2/02/07
117.6
KC2.4
1 2/02/07
110.6
KC2.4
1 2/02/07
80.8
KC2.4
1 2/02/07
83.1
KC2.4
1 2/02/07
83.6
KC2.4
1 2/02/07
79.2
KC2.4
1 2/02/07
76.2
KC2.4
1 2/02/07
72.3
KC2.4
1 2/02/07
73
KC2.4
1 2/02/07
68.4
KC2.4
1 2/02/07
65.1
KC2.4
1 2/02/07
63.2
KC2.4
1 2/02/07
63.6
KC2.4
1 2/02/07
60.4
KC2.4
1 2/02/07
58.7
KC2.4
1 2/02/07
60.6
KC2.4
1 2/02/07
71.4
KC2.4
1 2/02/07
79.7
KC2.4
1 2/02/07
67.8
KC2.4
1 2/02/07
47
KC2.4
1 2/02/07
48.7
KC2.4
1 2/02/07
59.1
F-291

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/02/07
66.5
KC2.4
1 2/02/07
64.9
KC2.4
1 2/02/07
51.4
KC2.4
1 2/02/07
51.6
KC2.4
1 2/02/07
52.1
KC2.4
1 2/02/07
51.2
KC2.4
1 2/02/07
51.2
KC2.4
1 2/02/07
51.3
KC2.4
1 2/02/07
51.1
KC2.4
1 2/02/07
51.2
KC2.4
1 2/02/07
51.1
KC2.4
1 2/02/07
48.5
KC2.4
1 2/02/07
50.9
KC2.4
1 2/02/07
50.1
KC2.4
1 2/02/07
50.3
KC2.4
1 2/02/07
51.8
KC2.4
1 2/02/07
52.8
KC2.4
1 2/02/07
55.2
KC2.4
1 2/02/07
57.5
KC2.4
1 2/02/07
59.6
KC2.4
1 2/02/07
62.1
KC2.4
1 2/02/07
62.8
KC2.4
1 2/02/07
63.9
KC2.4
1 2/02/07
64.3
KC2.4
1 2/02/07
67.6
KC2.4
1 2/02/07
69.2
KC2.4
1 2/02/07
66.6
KC2.4
1 2/02/07
58.6
KC2.4
1 2/02/07
52.6
KC2.4
1 2/02/07
44.1
KC2.4
1 2/02/07
35.5
KC2.4
1 2/02/07
25.7
KC2.4
1 2/02/07
14.8
KC2.4
1 2/02/07
10.4
KC2.4
1 2/02/07
14.6
KC2.4
1 2/02/07
17.1
KC2.4
1 2/03/07
113.2
KC2.4
1 2/03/07
145.5
KC2.4
1 2/03/07
155.8
KC2.4
1 2/03/07
151.7
KC2.4
1 2/03/07
131.8
KC2.4
1 2/03/07
138.6
KC2.4
1 2/03/07
695.2
KC2.4
1 2/03/07
495.5
KC2.4
1 2/03/07
134.3
F-292

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/03/07
85.3
KC2.4
1 2/03/07
81.8
KC2.4
1 2/03/07
84.9
KC2.4
1 2/03/07
104.7
KC2.4
1 2/03/07
131.7
KC2.4
1 2/03/07
147.2
KC2.4
1 2/03/07
164.3
KC2.4
1 2/03/07
175.3
KC2.4
1 2/03/07
198.8
KC2.4
1 2/03/07
215
KC2.4
1 2/03/07
176.1
KC2.4
1 2/03/07
88.6
KC2.4
1 2/03/07
84.9
KC2.4
1 2/03/07
88.5
KC2.4
1 2/03/07
116
KC2.4
1 2/03/07
128.9
KC2.4
1 2/03/07
134.1
KC2.4
1 2/03/07
119.2
KC2.4
1 2/03/07
91.6
KC2.4
1 2/03/07
106.2
KC2.4
1 2/03/07
123
KC2.4
1 2/03/07
102.1
KC2.4
1 2/03/07
103.7
KC2.4
1 2/03/07
123.2
KC2.4
1 2/03/07
116
KC2.4
1 2/03/07
95
KC2.4
1 2/03/07
123.8
KC2.4
1 2/03/07
148.6
KC2.4
1 2/03/07
151.1
KC2.4
1 2/03/07
152.5
KC2.4
1 2/03/07
112.6
KC2.4
1 2/03/07
117.3
KC2.4
1 2/03/07
160.1
KC2.4
1 2/03/07
161.8
KC2.4
1 2/03/07
119.9
KC2.4
1 2/03/07
115.9
KC2.4
1 2/03/07
156.7
KC2.4
1 2/03/07
180.8
KC2.4
1 2/03/07
157.1
KC2.4
1 2/03/07
140.5
KC2.4
1 2/03/07
174.2
KC2.4
1 2/03/07
206.2
KC2.4
1 2/03/07
170
KC2.4
1 2/03/07
153.6
KC2.4
1 2/03/07
167.7
F-293

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/03/07
190.4
KC2.4
1 2/03/07
216.7
KC2.4
1 2/03/07
228.8
KC2.4
1 2/03/07
197.3
KC2.4
1 2/03/07
144.5
KC2.4
1 2/03/07
145
KC2.4
1 2/03/07
143
KC2.4
1 2/03/07
147.2
KC2.4
1 2/03/07
158.7
KC2.4
1 2/03/07
152.2
KC2.4
1 2/03/07
152.8
KC2.4
1 2/03/07
158.6
KC2.4
1 2/03/07
154.1
KC2.4
1 2/03/07
162
KC2.4
1 2/03/07
151.9
KC2.4
1 2/03/07
154.9
KC2.4
1 2/03/07
141.1
KC2.4
1 2/03/07
140.8
KC2.4
1 2/03/07
141.7
KC2.4
1 2/03/07
131.5
KC2.4
1 2/03/07
117.7
KC2.4
1 2/03/07
114.5
KC2.4
1 2/03/07
113.1
KC2.4
1 2/03/07
120.8
KC2.4
1 2/03/07
120.9
KC2.4
1 2/03/07
120.6
KC2.4
1 2/03/07
141.3
KC2.4
1 2/03/07
201.5
KC2.4
1 2/03/07
273.3
KC2.4
1 2/03/07
294.8
KC2.4
1 2/03/07
212
KC2.4
1 2/03/07
137.9
KC2.4
1 2/03/07
116.5
KC2.4
1 2/03/07
82.4
KC2.4
1 2/03/07
98.6
KC2.4
1 2/03/07
75.7
KC2.4
1 2/03/07
74.2
KC2.4
1 2/04/07
107.1
KC2.4
1 2/04/07
116
KC2.4
1 2/04/07
128.8
KC2.4
1 2/04/07
106
KC2.4
1 2/04/07
95.9
KC2.4
1 2/04/07
90.9
KC2.4
1 2/04/07
107.8
KC2.4
1 2/04/07
123.4
F-294

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/04/07
144.7
KC2.4
1 2/04/07
117.3
KC2.4
1 2/04/07
106.8
KC2.4
1 2/04/07
100
KC2.4
1 2/04/07
96.8
KC2.4
1 2/04/07
100.2
KC2.4
1 2/04/07
118.6
KC2.4
1 2/04/07
120.5
KC2.4
1 2/04/07
98.5
KC2.4
1 2/04/07
104.7
KC2.4
1 2/04/07
110
KC2.4
1 2/04/07
126.7
KC2.4
1 2/04/07
103.8
KC2.4
1 2/04/07
101.4
KC2.4
1 2/04/07
95.8
KC2.4
1 2/04/07
91.5
KC2.4
1 2/04/07
91.5
KC2.4
1 2/04/07
111.7
KC2.4
1 2/04/07
123.5
KC2.4
1 2/04/07
142.3
KC2.4
1 2/04/07
143.3
KC2.4
1 2/04/07
119.7
KC2.4
1 2/04/07
105.4
KC2.4
1 2/04/07
101.8
KC2.4
1 2/04/07
108.6
KC2.4
1 2/04/07
137.9
KC2.4
1 2/04/07
153.6
KC2.4
1 2/04/07
142
KC2.4
1 2/04/07
124.5
KC2.4
1 2/04/07
129.5
KC2.4
1 2/04/07
152.4
KC2.4
1 2/04/07
172.3
KC2.4
1 2/04/07
145.3
KC2.4
1 2/04/07
132.2
KC2.4
1 2/04/07
132.2
KC2.4
1 2/04/07
129.1
KC2.4
1 2/04/07
124.2
KC2.4
1 2/04/07
135.7
KC2.4
1 2/04/07
155.8
KC2.4
1 2/04/07
152.9
KC2.4
1 2/04/07
153.1
KC2.4
1 2/04/07
156.6
KC2.4
1 2/04/07
163.3
KC2.4
1 2/04/07
157.6
KC2.4
1 2/04/07
125.9
F-295

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/04/07
96.1
KC2.4
1 2/04/07
89
KC2.4
1 2/04/07
89.8
KC2.4
1 2/04/07
112.2
KC2.4
1 2/04/07
138.6
KC2.4
1 2/04/07
141
KC2.4
1 2/04/07
137.2
KC2.4
1 2/04/07
126.1
KC2.4
1 2/04/07
101.3
KC2.4
1 2/04/07
101.5
KC2.4
1 2/04/07
136.8
KC2.4
1 2/04/07
158.4
KC2.4
1 2/04/07
155.4
KC2.4
1 2/04/07
148.7
KC2.4
1 2/04/07
127.6
KC2.4
1 2/04/07
88.1
KC2.4
1 2/04/07
81.5
KC2.4
1 2/04/07
93.9
KC2.4
1 2/04/07
119.4
KC2.4
1 2/04/07
139
KC2.4
1 2/04/07
145.9
KC2.4
1 2/04/07
127.3
KC2.4
1 2/04/07
95.6
KC2.4
1 2/04/07
84.9
KC2.4
1 2/04/07
86.6
KC2.4
1 2/04/07
99.6
KC2.4
1 2/04/07
126.2
KC2.4
1 2/04/07
135.9
KC2.4
1 2/04/07
132.8
KC2.4
1 2/04/07
117.8
KC2.4
1 2/04/07
83.6
KC2.4
1 2/04/07
73.5
KC2.4
1 2/04/07
88.1
KC2.4
1 2/04/07
111.9
KC2.4
1 2/04/07
127.6
KC2.4
1 2/04/07
116.7
KC2.4
1 2/04/07
85.8
KC2.4
1 2/04/07
50.2
KC2.4
1 2/04/07
80.9
KC2.4
1 2/04/07
87.3
KC2.4
1 2/05/07
126.5
KC2.4
1 2/05/07
114.6
KC2.4
1 2/05/07
86.4
KC2.4
1 2/05/07
79.2
KC2.4
1 2/05/07
69.3
F-296

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/05/07
70.5
KC2.4
1 2/05/07
89.7
KC2.4
1 2/05/07
96.3
KC2.4
1 2/05/07
102.8
KC2.4
1 2/05/07
105.9
KC2.4
1 2/05/07
84.4
KC2.4
1 2/05/07
78.6
KC2.4
1 2/05/07
72.8
KC2.4
1 2/05/07
81.4
KC2.4
1 2/05/07
91.6
KC2.4
1 2/05/07
106.4
KC2.4
1 2/05/07
107.4
KC2.4
1 2/05/07
87.4
KC2.4
1 2/05/07
85.4
KC2.4
1 2/05/07
82.6
KC2.4
1 2/05/07
76.5
KC2.4
1 2/05/07
82.8
KC2.4
1 2/05/07
96.1
KC2.4
1 2/05/07
92.5
KC2.4
1 2/05/07
72.2
KC2.4
1 2/05/07
71.4
KC2.4
1 2/05/07
84.8
KC2.4
1 2/05/07
106.4
KC2.4
1 2/05/07
115.9
KC2.4
1 2/05/07
110.3
KC2.4
1 2/05/07
85.9
KC2.4
1 2/05/07
79
KC2.4
1 2/05/07
77.2
KC2.4
1 2/05/07
75
KC2.4
1 2/05/07
89.1
KC2.4
1 2/05/07
99.3
KC2.4
1 2/05/07
117.4
KC2.4
1 2/05/07
108.4
KC2.4
1 2/05/07
88.2
KC2.4
1 2/05/07
84.7
KC2.4
1 2/05/07
79
KC2.4
1 2/05/07
86.5
KC2.4
1 2/05/07
106.5
KC2.4
1 2/05/07
117.8
KC2.4
1 2/05/07
113.6
KC2.4
1 2/05/07
88.9
KC2.4
1 2/05/07
84.4
KC2.4
1 2/05/07
81.1
KC2.4
1 2/05/07
90.7
KC2.4
1 2/05/07
113.6
F-297

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/05/07
110.8
KC2.4
1 2/05/07
89.2
KC2.4
1 2/05/07
81.5
KC2.4
1 2/05/07
98.6
KC2.4
1 2/05/07
96.5
KC2.4
1 2/05/07
87.4
KC2.4
1 2/05/07
104.4
KC2.4
1 2/05/07
122.2
KC2.4
1 2/05/07
114.8
KC2.4
1 2/05/07
88.3
KC2.4
1 2/05/07
79.3
KC2.4
1 2/05/07
75.6
KC2.4
1 2/05/07
77.4
KC2.4
1 2/05/07
90.6
KC2.4
1 2/05/07
102.5
KC2.4
1 2/05/07
116.9
KC2.4
1 2/05/07
119.5
KC2.4
1 2/05/07
90.7
KC2.4
1 2/05/07
82.2
KC2.4
1 2/05/07
80.4
KC2.4
1 2/05/07
82.7
KC2.4
1 2/05/07
101.2
KC2.4
1 2/05/07
107.9
KC2.4
1 2/05/07
101
KC2.4
1 2/05/07
85.3
KC2.4
1 2/05/07
83.1
KC2.4
1 2/05/07
101.6
KC2.4
1 2/05/07
117.5
KC2.4
1 2/05/07
121.8
KC2.4
1 2/05/07
99.3
KC2.4
1 2/05/07
88.4
KC2.4
1 2/05/07
84.8
KC2.4
1 2/05/07
82.3
KC2.4
1 2/05/07
87.7
KC2.4
1 2/05/07
105
KC2.4
1 2/05/07
115.6
KC2.4
1 2/05/07
125.8
KC2.4
1 2/05/07
93.8
KC2.4
1 2/05/07
71.8
KC2.4
1 2/05/07
85.7
KC2.4
1 2/05/07
184.1
KC2.4
1 2/05/07
206.6
KC2.4
1 2/05/07
86
KC2.4
1 2/05/07
90.8
KC2.4
1 2/06/07
87.9
F-298

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/06/07
84.4
KC2.4
1 2/06/07
80.8
KC2.4
1 2/06/07
78.6
KC2.4
1 2/06/07
84.9
KC2.4
1 2/06/07
110.1
KC2.4
1 2/06/07
120.8
KC2.4
1 2/06/07
130.3
KC2.4
1 2/06/07
128.9
KC2.4
1 2/06/07
110.7
KC2.4
1 2/06/07
88.9
KC2.4
1 2/06/07
81.4
KC2.4
1 2/06/07
80.2
KC2.4
1 2/06/07
79.2
KC2.4
1 2/06/07
79.3
KC2.4
1 2/06/07
75
KC2.4
1 2/06/07
69.8
KC2.4
1 2/06/07
68.3
KC2.4
1 2/06/07
77.3
KC2.4
1 2/06/07
91.2
KC2.4
1 2/06/07
99.6
KC2.4
1 2/06/07
101.8
KC2.4
1 2/06/07
93.6
KC2.4
1 2/06/07
75.9
KC2.4
1 2/06/07
71
KC2.4
1 2/06/07
81.9
KC2.4
1 2/06/07
100.4
KC2.4
1 2/06/07
104.2
KC2.4
1 2/06/07
110
KC2.4
1 2/06/07
105.6
KC2.4
1 2/06/07
89.4
KC2.4
1 2/06/07
68.1
KC2.4
1 2/06/07
71.2
KC2.4
1 2/06/07
77.2
KC2.4
1 2/06/07
93.6
KC2.4
1 2/06/07
105.4
KC2.4
1 2/06/07
111.1
KC2.4
1 2/06/07
117
KC2.4
1 2/06/07
113.6
KC2.4
1 2/06/07
103.6
KC2.4
1 2/06/07
98.2
KC2.4
1 2/06/07
72.4
KC2.4
1 2/06/07
69.4
KC2.4
1 2/06/07
72.1
KC2.4
1 2/06/07
86.8
KC2.4
1 2/06/07
96.9
F-299

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/06/07
99.5
KC2.4
1 2/06/07
98
KC2.4
1 2/06/07
86.3
KC2.4
1 2/06/07
67.7
KC2.4
1 2/06/07
68.4
KC2.4
1 2/06/07
83.7
KC2.4
1 2/06/07
99.3
KC2.4
1 2/06/07
101.1
KC2.4
1 2/06/07
117.8
KC2.4
1 2/06/07
145.1
KC2.4
1 2/06/07
148.1
KC2.4
1 2/06/07
91.8
KC2.4
1 2/06/07
69.1
KC2.4
1 2/06/07
66.9
KC2.4
1 2/06/07
67.3
KC2.4
1 2/06/07
81.1
KC2.4
1 2/06/07
97.8
KC2.4
1 2/06/07
100.1
KC2.4
1 2/06/07
CO
CO
CO
KC2.4
1 2/06/07
69.4
KC2.4
1 2/06/07
65.7
KC2.4
1 2/06/07
66.9
KC2.4
1 2/06/07
81.5
KC2.4
1 2/06/07
95.2
KC2.4
1 2/06/07
88.5
KC2.4
1 2/06/07
68.9
KC2.4
1 2/06/07
65.6
KC2.4
1 2/06/07
66.6
KC2.4
1 2/06/07
79.8
KC2.4
1 2/06/07
91.6
KC2.4
1 2/06/07
95.9
KC2.4
1 2/06/07
102
KC2.4
1 2/06/07
91.3
KC2.4
1 2/06/07
73
KC2.4
1 2/06/07
64.2
KC2.4
1 2/06/07
73.5
KC2.4
1 2/06/07
90.6
KC2.4
1 2/06/07
103.1
KC2.4
1 2/06/07
126.9
KC2.4
1 2/06/07
151.8
KC2.4
1 2/06/07
129.9
KC2.4
1 2/06/07
75
KC2.4
1 2/06/07
54
KC2.4
1 2/06/07
41.4
KC2.4
1 2/06/07
32.3
F-300

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/06/07
112.7
KC2.4
1 2/07/07
103.6
KC2.4
1 2/07/07
83.5
KC2.4
1 2/07/07
79.4
KC2.4
1 2/07/07
82.6
KC2.4
1 2/07/07
100.3
KC2.4
1 2/07/07
119.2
KC2.4
1 2/07/07
88.9
KC2.4
1 2/07/07
78.2
KC2.4
1 2/07/07
78.7
KC2.4
1 2/07/07
85.5
KC2.4
1 2/07/07
107.1
KC2.4
1 2/07/07
110.2
KC2.4
1 2/07/07
87.4
KC2.4
1 2/07/07
83.1
KC2.4
1 2/07/07
81.3
KC2.4
1 2/07/07
80.8
KC2.4
1 2/07/07
87.8
KC2.4
1 2/07/07
98.7
KC2.4
1 2/07/07
97
KC2.4
1 2/07/07
84.1
KC2.4
1 2/07/07
84.1
KC2.4
1 2/07/07
92.4
KC2.4
1 2/07/07
109.1
KC2.4
1 2/07/07
112.5
KC2.4
1 2/07/07
101.2
KC2.4
1 2/07/07
86.3
KC2.4
1 2/07/07
85.9
KC2.4
1 2/07/07
86.9
KC2.4
1 2/07/07
89.9
KC2.4
1 2/07/07
109.1
KC2.4
1 2/07/07
111
KC2.4
1 2/07/07
98.1
KC2.4
1 2/07/07
96
KC2.4
1 2/07/07
91.7
KC2.4
1 2/07/07
93.1
KC2.4
1 2/07/07
107.9
KC2.4
1 2/07/07
109.5
KC2.4
1 2/07/07
102.1
KC2.4
1 2/07/07
93.4
KC2.4
1 2/07/07
88.5
KC2.4
1 2/07/07
96.1
KC2.4
1 2/07/07
116.1
KC2.4
1 2/07/07
158.2
KC2.4
1 2/07/07
197.1
F-301

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
1 2/07/07
190.5
KC2.4
1 2/07/07
289.6
KC2.4
1 2/07/07
151.8
KC2.4
1 2/07/07
49.2
KC2.4
1 2/07/07
55.8
KC2.4
1 2/07/07
72.7
KC2.4
1 2/07/07
104.1
KC2.4
1 2/07/07
104.2
KC2.4
1 2/07/07
109.5
KC2.4
1 2/07/07
108.3
KC2.4
1 2/07/07
110.7
KC2.4
1 2/07/07
111.2
KC2.4
1 2/07/07
117.1
KC2.4
1 2/07/07
120.9
KC2.4
1 2/07/07
114.4
KC2.4
1 2/07/07
129.4
KC2.4
1 2/07/07
129.4
KC2.4
1 2/07/07
117.3
KC2.4
1 2/07/07
104
KC2.4
1 2/07/07
100.5
KC2.4
1 2/07/07
76.7
KC2.4
1 2/07/07
55.3
KC2.4
1 2/07/07
74.7
KC2.4
1 2/07/07
96.8
KC2.4
1 2/07/07
86.1
KC2.4
01/02/08
18
KC2.4
01/02/08
12.3
KC2.4
01/02/08
13
KC2.4
01/02/08
14.1
KC2.4
01/02/08
16
KC2.4
01/02/08
18.9
KC2.4
01/02/08
21.9
KC2.4
01/02/08
22
KC2.4
01/02/08
22
KC2.4
01/02/08
53.3
KC2.4
01/02/08
21.3
KC2.4
01/02/08
21.2
KC2.4
01/02/08
20.7
KC2.4
01/02/08
22.7
KC2.4
01/02/08
21.7
KC2.4
01/02/08
23.7
KC2.4
01/02/08
26.1
KC2.4
01/02/08
26.7
KC2.4
01/02/08
27.8
KC2.4
01/02/08
28.6
F-302

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/02/08
28.1
KC2.4
01/02/08
29.7
KC2.4
01/02/08
29.7
KC2.4
01/02/08
30.2
KC2.4
01/02/08
31.1
KC2.4
01/02/08
32.6
KC2.4
01/02/08
33.3
KC2.4
01/02/08
33.9
KC2.4
01/02/08
35.7
KC2.4
01/02/08
35.1
KC2.4
01/02/08
36.4
KC2.4
01/02/08
35.8
KC2.4
01/02/08
35.5
KC2.4
01/02/08
35.1
KC2.4
01/02/08
36.3
KC2.4
01/02/08
37.2
KC2.4
01/03/08
23.9
KC2.4
01/03/08
22.8
KC2.4
01/03/08
22.4
KC2.4
01/03/08
23.8
KC2.4
01/03/08
26.1
KC2.4
01/03/08
25.3
KC2.4
01/03/08
24.6
KC2.4
01/03/08
24
KC2.4
01/03/08
22.9
KC2.4
01/03/08
22.5
KC2.4
01/03/08
23.2
KC2.4
01/03/08
23.6
KC2.4
01/03/08
23.4
KC2.4
01/03/08
22.7
KC2.4
01/03/08
22.4
KC2.4
01/03/08
22.2
KC2.4
01/03/08
22.3
KC2.4
01/03/08
23.1
KC2.4
01/03/08
23.7
KC2.4
01/03/08
23.9
KC2.4
01/03/08
24.1
KC2.4
01/03/08
24
KC2.4
01/03/08
24.1
KC2.4
01/04/08
27.5
KC2.4
01/04/08
21.4
KC2.4
01/04/08
20.7
KC2.4
01/04/08
21.2
KC2.4
01/04/08
22.1
KC2.4
01/04/08
24.7
F-303

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/04/08
26.7
KC2.4
01/04/08
29.5
KC2.4
01/04/08
31.7
KC2.4
01/04/08
31.3
KC2.4
01/04/08
33.6
KC2.4
01/04/08
34.4
KC2.4
01/04/08
35.6
KC2.4
01/04/08
36.7
KC2.4
01/04/08
37.3
KC2.4
01/04/08
37.3
KC2.4
01/04/08
37.2
KC2.4
01/04/08
37.3
KC2.4
01/04/08
37
KC2.4
01/05/08
34.2
KC2.4
01/05/08
31.1
KC2.4
01/05/08
32.9
KC2.4
01/05/08
31.9
KC2.4
01/05/08
31.6
KC2.4
01/05/08
32.4
KC2.4
01/05/08
33.2
KC2.4
01/05/08
34.4
KC2.4
01/05/08
34.7
KC2.4
01/05/08
34.5
KC2.4
01/05/08
34.4
KC2.4
01/05/08
35.2
KC2.4
01/05/08
37.4
KC2.4
01/05/08
40.5
KC2.4
01/05/08
42.8
KC2.4
01/05/08
43.8
KC2.4
01/05/08
43
KC2.4
01/07/08
30.9
KC2.4
01/07/08
26.8
KC2.4
01/07/08
29.3
KC2.4
01/07/08
28.7
KC2.4
01/07/08
27
KC2.4
01/07/08
25.6
KC2.4
01/07/08
24.9
KC2.4
01/07/08
24.6
KC2.4
01/07/08
24.1
KC2.4
01/07/08
24.1
KC2.4
01/07/08
24
KC2.4
01/07/08
23.1
KC2.4
01/07/08
22.3
KC2.4
01/07/08
21.9
KC2.4
01/07/08
21.4
F-304

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/07/08
21.5
KC2.4
01/07/08
21.7
KC2.4
01/07/08
21.6
KC2.4
01/07/08
21.8
KC2.4
01/07/08
21.9
KC2.4
01/07/08
21.9
KC2.4
01/07/08
21.7
KC2.4
01/07/08
22
KC2.4
01/07/08
23.5
KC2.4
01/07/08
36.5
KC2.4
01/07/08
24.7
KC2.4
01/07/08
24.8
KC2.4
01/07/08
24.3
KC2.4
01/07/08
24
KC2.4
01/07/08
22.9
KC2.4
01/07/08
22.3
KC2.4
01/07/08
23.2
KC2.4
01/08/08
15.7
KC2.4
01/08/08
15.7
KC2.4
01/08/08
17.3
KC2.4
01/08/08
19.7
KC2.4
01/08/08
19.9
KC2.4
01/08/08
20.4
KC2.4
01/08/08
20.3
KC2.4
01/08/08
20.1
KC2.4
01/08/08
19.8
KC2.4
01/08/08
19.3
KC2.4
01/08/08
20
KC2.4
01/08/08
20.2
KC2.4
01/08/08
19.7
KC2.4
01/08/08
19.2
KC2.4
01/08/08
18.9
KC2.4
01/08/08
18.5
KC2.4
01/08/08
19
KC2.4
01/08/08
20.2
KC2.4
01/08/08
21.8
KC2.4
01/08/08
21.7
KC2.4
01/08/08
21.7
KC2.4
01/08/08
21.8
KC2.4
01/08/08
21.9
KC2.4
01/08/08
22.6
KC2.4
01/08/08
22.6
KC2.4
01/08/08
22
KC2.4
01/08/08
23
KC2.4
01/08/08
23.5
F-305

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/08/08
22.5
KC2.4
01/08/08
22.9
KC2.4
01/08/08
23.7
KC2.4
01/08/08
23.1
KC2.4
01/08/08
23.5
KC2.4
01/08/08
22.8
KC2.4
01/08/08
22.9
KC2.4
01/08/08
23.6
KC2.4
01/08/08
23.8
KC2.4
01/08/08
24.4
KC2.4
01/08/08
24.6
KC2.4
01/08/08
25.2
KC2.4
01/08/08
24.2
KC2.4
01/08/08
23.8
KC2.4
01/08/08
23.9
KC2.4
01/08/08
22.8
KC2.4
01/08/08
23.5
KC2.4
01/08/08
23.9
KC2.4
01/08/08
23.8
KC2.4
01/08/08
24.2
KC2.4
01/08/08
23.4
KC2.4
01/08/08
24
KC2.4
01/08/08
24.5
KC2.4
01/08/08
24.5
KC2.4
01/08/08
25.7
KC2.4
01/08/08
25.5
KC2.4
01/08/08
25.8
KC2.4
01/08/08
27.1
KC2.4
01/08/08
28.2
KC2.4
01/08/08
28.5
KC2.4
01/08/08
29.2
KC2.4
01/08/08
30.1
KC2.4
01/08/08
30.3
KC2.4
01/08/08
31.1
KC2.4
01/08/08
31.7
KC2.4
01/08/08
33.3
KC2.4
01/08/08
32.6
KC2.4
01/08/08
33.5
KC2.4
01/08/08
33.2
KC2.4
01/08/08
33
KC2.4
01/08/08
34.1
KC2.4
01/08/08
33.4
KC2.4
01/09/08
33.9
KC2.4
01/09/08
35.3
KC2.4
01/09/08
25
F-306

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/09/08
20.7
KC2.4
01/09/08
21.6
KC2.4
01/09/08
22.1
KC2.4
01/09/08
22.5
KC2.4
01/09/08
23.3
KC2.4
01/09/08
23.6
KC2.4
01/09/08
24
KC2.4
01/09/08
24.2
KC2.4
01/09/08
22.2
KC2.4
01/09/08
23.1
KC2.4
01/09/08
24.6
KC2.4
01/09/08
26.5
KC2.4
01/09/08
28.6
KC2.4
01/10/08
30.4
KC2.4
01/10/08
34
KC2.4
01/10/08
32.5
KC2.4
01/10/08
33.2
KC2.4
01/10/08
36.3
KC2.4
01/10/08
39.7
KC2.4
01/10/08
40.8
KC2.4
01/10/08
40.8
KC2.4
01/10/08
39.8
KC2.4
01/10/08
39.6
KC2.4
01/10/08
39.8
KC2.4
01/10/08
38.6
KC2.4
01/10/08
41.4
KC2.4
01/10/08
41.6
KC2.4
01/10/08
43.7
KC2.4
01/10/08
43.3
KC2.4
01/10/08
44
KC2.4
01/10/08
43.9
KC2.4
01/10/08
44.4
KC2.4
01/10/08
45.9
KC2.4
01/10/08
47.1
KC2.4
01/10/08
48.1
KC2.4
01/10/08
48.3
KC2.4
01/10/08
48.3
KC2.4
01/10/08
48
KC2.4
01/10/08
48.3
KC2.4
01/10/08
50
KC2.4
01/10/08
50.7
KC2.4
01/10/08
51.2
KC2.4
01/10/08
50.2
KC2.4
01/10/08
49.8
KC2.4
01/10/08
48.5
F-307

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/10/08
48.3
KC2.4
01/10/08
49.8
KC2.4
01/10/08
49.9
KC2.4
01/10/08
48.8
KC2.4
01/10/08
48.4
KC2.4
01/10/08
48.3
KC2.4
01/10/08
47.3
KC2.4
01/10/08
47
KC2.4
01/10/08
45.4
KC2.4
01/10/08
45.3
KC2.4
01/10/08
43.5
KC2.4
01/10/08
43.7
KC2.4
01/10/08
44.8
KC2.4
01/10/08
46.1
KC2.4
01/10/08
46.5
KC2.4
01/10/08
46.8
KC2.4
01/10/08
47.4
KC2.4
01/10/08
48
KC2.4
01/10/08
48.7
KC2.4
01/10/08
47.5
KC2.4
01/10/08
46.6
KC2.4
01/10/08
46
KC2.4
01/10/08
45.9
KC2.4
01/10/08
48.6
KC2.4
01/10/08
50.2
KC2.4
01/10/08
50.6
KC2.4
01/10/08
51.6
KC2.4
01/10/08
77.4
KC2.4
01/10/08
38.5
KC2.4
01/10/08
41.9
KC2.4
01/10/08
49
KC2.4
01/10/08
52.3
KC2.4
01/10/08
52.4
KC2.4
01/10/08
53.3
KC2.4
01/10/08
52.6
KC2.4
01/10/08
54
KC2.4
01/10/08
55.7
KC2.4
01/10/08
56.7
KC2.4
01/10/08
58.6
KC2.4
01/10/08
59.6
KC2.4
01/10/08
60.6
KC2.4
01/10/08
59.1
KC2.4
01/10/08
58
KC2.4
01/10/08
58.5
KC2.4
01/10/08
60.5
F-308

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/10/08
60.7
KC2.4
01/10/08
58.3
KC2.4
01/10/08
57.1
KC2.4
01/10/08
56.1
KC2.4
01/10/08
56.8
KC2.4
01/11/08
54.4
KC2.4
01/11/08
38.1
KC2.4
01/11/08
55.9
KC2.4
01/11/08
56.1
KC2.4
01/11/08
56.9
KC2.4
01/11/08
59.6
KC2.4
01/11/08
59.3
KC2.4
01/11/08
58.8
KC2.4
01/11/08
55.9
KC2.4
01/11/08
53.8
KC2.4
01/11/08
51.7
KC2.4
01/11/08
54.4
KC2.4
01/11/08
54.3
KC2.4
01/11/08
52
KC2.4
01/11/08
51.3
KC2.4
01/11/08
52.3
KC2.4
01/11/08
51.2
KC2.4
01/11/08
50.3
KC2.4
01/11/08
49.3
KC2.4
01/11/08
47.9
KC2.4
01/11/08
47.8
KC2.4
01/11/08
48.7
KC2.4
01/11/08
47.6
KC2.4
01/11/08
46.8
KC2.4
01/11/08
47
KC2.4
01/11/08
47.2
KC2.4
01/11/08
46.6
KC2.4
01/11/08
44.7
KC2.4
01/11/08
43.4
KC2.4
01/11/08
41.4
KC2.4
01/11/08
40.8
KC2.4
01/11/08
41.3
KC2.4
01/11/08
42.4
KC2.4
01/11/08
42.4
KC2.4
01/11/08
42.4
KC2.4
01/11/08
41.6
KC2.4
01/11/08
43
KC2.4
01/11/08
43.1
KC2.4
01/11/08
43
KC2.4
01/11/08
42
F-309

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/11/08
40.3
KC2.4
01/11/08
40.4
KC2.4
01/11/08
42.3
KC2.4
01/11/08
43
KC2.4
01/11/08
42.8
KC2.4
01/11/08
42.6
KC2.4
01/11/08
41.8
KC2.4
01/11/08
40.9
KC2.4
01/11/08
41.6
KC2.4
01/11/08
42.1
KC2.4
01/11/08
40.5
KC2.4
01/11/08
38.7
KC2.4
01/11/08
37.7
KC2.4
01/11/08
36.1
KC2.4
01/11/08
36.1
KC2.4
01/11/08
35.1
KC2.4
01/11/08
34.9
KC2.4
01/11/08
33.7
KC2.4
01/11/08
33.4
KC2.4
01/11/08
33.2
KC2.4
01/11/08
32.8
KC2.4
01/1 2/08
39.3
KC2.4
01/1 2/08
27
KC2.4
01/1 2/08
30.8
KC2.4
01/1 2/08
35.8
KC2.4
01/1 2/08
38.8
KC2.4
01/1 2/08
43.2
KC2.4
01/1 2/08
49.4
KC2.4
01/1 2/08
56.2
KC2.4
01/1 2/08
59.7
KC2.4
01/1 2/08
61.4
KC2.4
01/1 2/08
63.6
KC2.4
01/1 2/08
65.6
KC2.4
01/1 2/08
67.1
KC2.4
01/1 2/08
69.2
KC2.4
01/1 2/08
69.9
KC2.4
01/1 2/08
68.4
KC2.4
01/1 2/08
68.5
KC2.4
01/1 2/08
67.4
KC2.4
01/1 2/08
67.3
KC2.4
01/1 2/08
68
KC2.4
01/1 2/08
71
KC2.4
01/1 2/08
71.6
KC2.4
01/1 2/08
71.6
KC2.4
01/1 2/08
69.4
F-310

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/1 2/08
68.8
KC2.4
01/1 2/08
70.8
KC2.4
01/1 2/08
73.3
KC2.4
01/1 2/08
72.1
KC2.4
01/1 2/08
71.8
KC2.4
01/1 2/08
73
KC2.4
01/1 2/08
71.5
KC2.4
01/1 2/08
70.4
KC2.4
01/1 2/08
71.9
KC2.4
01/1 2/08
75.2
KC2.4
01/1 2/08
73.9
KC2.4
01/1 2/08
71.5
KC2.4
01/1 2/08
72.1
KC2.4
01/1 2/08
71.4
KC2.4
01/1 2/08
71.2
KC2.4
01/1 2/08
70.9
KC2.4
01/1 2/08
72.3
KC2.4
01/1 2/08
73
KC2.4
01/1 2/08
70.6
KC2.4
01/1 2/08
68.3
KC2.4
01/1 2/08
65.5
KC2.4
01/1 2/08
63.8
KC2.4
01/1 2/08
62.2
KC2.4
01/1 2/08
61.5
KC2.4
01/1 2/08
65.5
KC2.4
01/14/08
34.8
KC2.4
01/14/08
40.9
KC2.4
01/14/08
44.6
KC2.4
01/14/08
43.7
KC2.4
01/14/08
43.8
KC2.4
01/14/08
44.8
KC2.4
01/14/08
45.6
KC2.4
01/14/08
46.5
KC2.4
01/14/08
47.9
KC2.4
01/14/08
49.5
KC2.4
01/14/08
50.2
KC2.4
01/14/08
50.7
KC2.4
01/14/08
51.5
KC2.4
01/14/08
52.1
KC2.4
01/14/08
52.7
KC2.4
01/14/08
53.3
KC2.4
01/14/08
52.9
KC2.4
01/14/08
52
KC2.4
01/14/08
53.8
KC2.4
01/14/08
54.3
F-311

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/14/08
53.2
KC2.4
01/14/08
51.2
KC2.4
01/14/08
49.9
KC2.4
01/14/08
49.9
KC2.4
01/14/08
50.2
KC2.4
01/20/08
46.9
KC2.4
01/20/08
38.5
KC2.4
01/20/08
38.3
KC2.4
01/20/08
48.4
KC2.4
01/20/08
57.4
KC2.4
01/20/08
51.8
KC2.4
01/20/08
57.6
KC2.4
01/20/08
60.2
KC2.4
01/20/08
60.9
KC2.4
01/20/08
54.9
KC2.4
01/21/08
64.4
KC2.4
01/26/08
22.8
KC2.4
01/26/08
22.2
KC2.4
01/26/08
21
KC2.4
01/26/08
22.1
KC2.4
01/26/08
125.7
KC2.4
01/26/08
40.2
KC2.4
01/29/08
92.4
KC2.4
01/29/08
37.4
KC2.4
01/29/08
44.5
KC2.4
01/29/08
46.3
KC2.4
01/29/08
49.6
KC2.4
01/29/08
48.9
KC2.4
01/29/08
52
KC2.4
01/29/08
52.2
KC2.4
01/29/08
53.8
KC2.4
01/29/08
55
KC2.4
01/29/08
53.8
KC2.4
01/29/08
59.3
KC2.4
01/29/08
60.2
KC2.4
01/29/08
62.6
KC2.4
01/29/08
62.1
KC2.4
01/29/08
75.6
KC2.4
01/30/08
75.5
KC2.4
01/30/08
59
KC2.4
01/30/08
38.7
KC2.4
01/30/08
72.6
KC2.4
01/30/08
78
KC2.4
01/30/08
78.3
KC2.4
01/30/08
77
F-312

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.4
01/30/08
78.3
KC2.4
01/30/08
81.1
KC2.4
01/30/08
79.2
KC2.4
01/30/08
75.3
KC2.4
01/30/08
80.5
KC2.4
01/30/08
82.4
KC2.4
01/30/08
79.4
KC2.4
01/30/08
67.1
KC2.4
01/30/08
57.8
KC2.4
01/30/08
55.2
KC2.4
01/30/08
51.5
KC2.4
01/30/08
48.6
KC2.4
01/31/08
31.3
KC2.4
01/31/08
38.2
KC2.4
01/31/08
35.5
KC2.4
01/31/08
32.8
KC2.4
01/31/08
53.8
KC2.4
01/31/08
65.6
KC2.4
01/31/08
67.2
KC2.4
01/31/08
69.5
KC2.4
01/31/08
73
KC2.4
01/31/08
73.5
KC2.4
01/31/08
70.6
KC2.4
01/31/08
70.2
KC2.4
01/31/08
70.4
KC2.4
01/31/08
68.8
KC2.4
01/31/08
75.4
KC2.4
01/31/08
80.5
KC2.4
01/31/08
72
KC2.4
01/31/08
71.2
KC2.4
01/31/08
73.1
KC2.4
01/31/08
71.8
KC2.4
01/31/08
72.6
KC2.4
01/31/08
76.9
KC2.5
1 2/02/07
52.7
KC2.5
1 2/02/07
50.6
KC2.5
1 2/02/07
47.8
KC2.5
1 2/02/07
45.9
KC2.5
1 2/02/07
42.7
KC2.5
1 2/02/07
44.6
KC2.5
1 2/02/07
52.1
KC2.5
1 2/02/07
58.7
KC2.5
1 2/02/07
64.4
KC2.5
1 2/02/07
74.2
KC2.5
1 2/02/07
78.9
F-313

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/02/07
65.2
KC2.5
1 2/02/07
61.7
KC2.5
1 2/02/07
55.4
KC2.5
1 2/02/07
51.7
KC2.5
1 2/02/07
53
KC2.5
1 2/02/07
66.5
KC2.5
1 2/02/07
81.4
KC2.5
1 2/02/07
94.5
KC2.5
1 2/02/07
97.4
KC2.5
1 2/02/07
80.7
KC2.5
1 2/02/07
76.9
KC2.5
1 2/02/07
74.3
KC2.5
1 2/02/07
75
KC2.5
1 2/02/07
87
KC2.5
1 2/02/07
106.3
KC2.5
1 2/02/07
93.6
KC2.5
1 2/02/07
79.4
KC2.5
1 2/02/07
74.8
KC2.5
1 2/02/07
73.5
KC2.5
1 2/02/07
77.4
KC2.5
1 2/02/07
90
KC2.5
1 2/02/07
81.8
KC2.5
1 2/02/07
77.6
KC2.5
1 2/02/07
70.9
KC2.5
1 2/02/07
60.4
KC2.5
1 2/02/07
60.3
KC2.5
1 2/02/07
58.6
KC2.5
1 2/02/07
58
KC2.5
1 2/02/07
54
KC2.5
1 2/02/07
56
KC2.5
1 2/02/07
62.6
KC2.5
1 2/02/07
57.7
KC2.5
1 2/02/07
47.9
KC2.5
1 2/02/07
45.9
KC2.5
1 2/02/07
44.2
KC2.5
1 2/02/07
42.6
KC2.5
1 2/02/07
42.9
KC2.5
1 2/02/07
44.2
KC2.5
1 2/02/07
49.4
KC2.5
1 2/02/07
51.8
KC2.5
1 2/02/07
43.9
KC2.5
1 2/02/07
36.3
KC2.5
1 2/02/07
37.8
KC2.5
1 2/02/07
41.6
KC2.5
1 2/02/07
44.3
F-314

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/02/07
40.3
KC2.5
1 2/02/07
37.2
KC2.5
1 2/02/07
36.7
KC2.5
1 2/02/07
36.3
KC2.5
1 2/02/07
35.8
KC2.5
1 2/02/07
36.2
KC2.5
1 2/02/07
36.2
KC2.5
1 2/02/07
34.5
KC2.5
1 2/02/07
34.9
KC2.5
1 2/02/07
35.2
KC2.5
1 2/02/07
35.9
KC2.5
1 2/02/07
36.5
KC2.5
1 2/02/07
36.3
KC2.5
1 2/02/07
36.5
KC2.5
1 2/02/07
37.8
KC2.5
1 2/02/07
40
KC2.5
1 2/02/07
42.9
KC2.5
1 2/02/07
44.9
KC2.5
1 2/02/07
47.4
KC2.5
1 2/02/07
49.8
KC2.5
1 2/02/07
50.5
KC2.5
1 2/02/07
52.3
KC2.5
1 2/02/07
53.3
KC2.5
1 2/02/07
52.5
KC2.5
1 2/02/07
54.6
KC2.5
1 2/02/07
51.7
KC2.5
1 2/02/07
45.7
KC2.5
1 2/02/07
38.3
KC2.5
1 2/02/07
30.4
KC2.5
1 2/02/07
21
KC2.5
1 2/02/07
12.6
KC2.5
1 2/02/07
8.8
KC2.5
1 2/02/07
27.1
KC2.5
1 2/02/07
31.4
KC2.5
1 2/03/07
61.3
KC2.5
1 2/03/07
75.9
KC2.5
1 2/03/07
94.1
KC2.5
1 2/03/07
101.7
KC2.5
1 2/03/07
84.7
KC2.5
1 2/03/07
103.4
KC2.5
1 2/03/07
420.6
KC2.5
1 2/03/07
525
KC2.5
1 2/03/07
188.8
KC2.5
1 2/03/07
83
KC2.5
1 2/03/07
62.2
F-315

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/03/07
54.9
KC2.5
1 2/03/07
58.8
KC2.5
1 2/03/07
77.8
KC2.5
1 2/03/07
83.5
KC2.5
1 2/03/07
94.4
KC2.5
1 2/03/07
95.6
KC2.5
1 2/03/07
101.5
KC2.5
1 2/03/07
143.4
KC2.5
1 2/03/07
134.6
KC2.5
1 2/03/07
65.3
KC2.5
1 2/03/07
61
KC2.5
1 2/03/07
60.6
KC2.5
1 2/03/07
68.2
KC2.5
1 2/03/07
77.1
KC2.5
1 2/03/07
86.8
KC2.5
1 2/03/07
83.4
KC2.5
1 2/03/07
66
KC2.5
1 2/03/07
71.6
KC2.5
1 2/03/07
80.6
KC2.5
1 2/03/07
78.4
KC2.5
1 2/03/07
74.1
KC2.5
1 2/03/07
81.2
KC2.5
1 2/03/07
83.4
KC2.5
1 2/03/07
73.7
KC2.5
1 2/03/07
82.3
KC2.5
1 2/03/07
96.7
KC2.5
1 2/03/07
102.5
KC2.5
1 2/03/07
96.5
KC2.5
1 2/03/07
84.2
KC2.5
1 2/03/07
79.8
KC2.5
1 2/03/07
105.4
KC2.5
1 2/03/07
108.8
KC2.5
1 2/03/07
106.7
KC2.5
1 2/03/07
107.4
KC2.5
1 2/03/07
113.1
KC2.5
1 2/03/07
127
KC2.5
1 2/03/07
142.2
KC2.5
1 2/03/07
113.9
KC2.5
1 2/03/07
128.3
KC2.5
1 2/03/07
158.3
KC2.5
1 2/03/07
149.8
KC2.5
1 2/03/07
130.5
KC2.5
1 2/03/07
141.3
KC2.5
1 2/03/07
142.6
KC2.5
1 2/03/07
175.8
F-316

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/03/07
200.4
KC2.5
1 2/03/07
175
KC2.5
1 2/03/07
135.2
KC2.5
1 2/03/07
133.3
KC2.5
1 2/03/07
133.3
KC2.5
1 2/03/07
135.4
KC2.5
1 2/03/07
142.8
KC2.5
1 2/03/07
138.2
KC2.5
1 2/03/07
137.1
KC2.5
1 2/03/07
149
KC2.5
1 2/03/07
146.5
KC2.5
1 2/03/07
145.9
KC2.5
1 2/03/07
143.3
KC2.5
1 2/03/07
148.4
KC2.5
1 2/03/07
134.2
KC2.5
1 2/03/07
132.9
KC2.5
1 2/03/07
132.4
KC2.5
1 2/03/07
129.8
KC2.5
1 2/03/07
110
KC2.5
1 2/03/07
105.6
KC2.5
1 2/03/07
101
KC2.5
1 2/03/07
101.8
KC2.5
1 2/03/07
96
KC2.5
1 2/03/07
86.9
KC2.5
1 2/03/07
89.2
KC2.5
1 2/03/07
106.9
KC2.5
1 2/03/07
166.6
KC2.5
1 2/03/07
233.7
KC2.5
1 2/03/07
208.3
KC2.5
1 2/03/07
122.6
KC2.5
1 2/03/07
96.6
KC2.5
1 2/03/07
56.2
KC2.5
1 2/03/07
60
KC2.5
1 2/03/07
72.4
KC2.5
1 2/03/07
57.7
KC2.5
1 2/04/07
70.5
KC2.5
1 2/04/07
78.3
KC2.5
1 2/04/07
86.1
KC2.5
1 2/04/07
81
KC2.5
1 2/04/07
73.8
KC2.5
1 2/04/07
71.7
KC2.5
1 2/04/07
78.3
KC2.5
1 2/04/07
90.4
KC2.5
1 2/04/07
101.9
KC2.5
1 2/04/07
87.4
F-317

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/04/07
80.9
KC2.5
1 2/04/07
78.4
KC2.5
1 2/04/07
72.5
KC2.5
1 2/04/07
76
KC2.5
1 2/04/07
88.5
KC2.5
1 2/04/07
83
KC2.5
1 2/04/07
84.7
KC2.5
1 2/04/07
84.6
KC2.5
1 2/04/07
84.6
KC2.5
1 2/04/07
85.7
KC2.5
1 2/04/07
82.6
KC2.5
1 2/04/07
74.8
KC2.5
1 2/04/07
68.3
KC2.5
1 2/04/07
66.9
KC2.5
1 2/04/07
66.7
KC2.5
1 2/04/07
73.5
KC2.5
1 2/04/07
77.8
KC2.5
1 2/04/07
86
KC2.5
1 2/04/07
96.6
KC2.5
1 2/04/07
90
KC2.5
1 2/04/07
82.3
KC2.5
1 2/04/07
74.3
KC2.5
1 2/04/07
75.7
KC2.5
1 2/04/07
89.3
KC2.5
1 2/04/07
103.2
KC2.5
1 2/04/07
112.6
KC2.5
1 2/04/07
100
KC2.5
1 2/04/07
87.8
KC2.5
1 2/04/07
104
KC2.5
1 2/04/07
143.5
KC2.5
1 2/04/07
130
KC2.5
1 2/04/07
119.9
KC2.5
1 2/04/07
112.7
KC2.5
1 2/04/07
109
KC2.5
1 2/04/07
82.8
KC2.5
1 2/04/07
80.2
KC2.5
1 2/04/07
96.6
KC2.5
1 2/04/07
121.2
KC2.5
1 2/04/07
127.4
KC2.5
1 2/04/07
135.5
KC2.5
1 2/04/07
155.7
KC2.5
1 2/04/07
156.2
KC2.5
1 2/04/07
129.8
KC2.5
1 2/04/07
100.2
KC2.5
1 2/04/07
78.1
F-318

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/04/07
63.2
KC2.5
1 2/04/07
78.1
KC2.5
1 2/04/07
111
KC2.5
1 2/04/07
111.1
KC2.5
1 2/04/07
108.5
KC2.5
1 2/04/07
109.4
KC2.5
1 2/04/07
90
KC2.5
1 2/04/07
74.1
KC2.5
1 2/04/07
92.5
KC2.5
1 2/04/07
118.9
KC2.5
1 2/04/07
121
KC2.5
1 2/04/07
125.7
KC2.5
1 2/04/07
111.4
KC2.5
1 2/04/07
77.2
KC2.5
1 2/04/07
61.6
KC2.5
1 2/04/07
58.3
KC2.5
1 2/04/07
75.1
KC2.5
1 2/04/07
94
KC2.5
1 2/04/07
103.4
KC2.5
1 2/04/07
95.2
KC2.5
1 2/04/07
73.8
KC2.5
1 2/04/07
59.2
KC2.5
1 2/04/07
51.7
KC2.5
1 2/04/07
53.3
KC2.5
1 2/04/07
66.1
KC2.5
1 2/04/07
79.6
KC2.5
1 2/04/07
101.8
KC2.5
1 2/04/07
91.1
KC2.5
1 2/04/07
62.1
KC2.5
1 2/04/07
51
KC2.5
1 2/04/07
51.8
KC2.5
1 2/04/07
64.4
KC2.5
1 2/04/07
71.5
KC2.5
1 2/04/07
76.7
KC2.5
1 2/04/07
58.6
KC2.5
1 2/04/07
40.4
KC2.5
1 2/04/07
57.6
KC2.5
1 2/04/07
52.1
KC2.5
1 2/05/07
73.4
KC2.5
1 2/05/07
71.5
KC2.5
1 2/05/07
67.3
KC2.5
1 2/05/07
54.7
KC2.5
1 2/05/07
48.1
KC2.5
1 2/05/07
47.4
KC2.5
1 2/05/07
52.4
F-319

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/05/07
56.8
KC2.5
1 2/05/07
68.9
KC2.5
1 2/05/07
67.8
KC2.5
1 2/05/07
60.5
KC2.5
1 2/05/07
54.2
KC2.5
1 2/05/07
50.4
KC2.5
1 2/05/07
53.1
KC2.5
1 2/05/07
61.2
KC2.5
1 2/05/07
67.7
KC2.5
1 2/05/07
69.1
KC2.5
1 2/05/07
64.8
KC2.5
1 2/05/07
59
KC2.5
1 2/05/07
55.8
KC2.5
1 2/05/07
53.3
KC2.5
1 2/05/07
57.8
KC2.5
1 2/05/07
65.4
KC2.5
1 2/05/07
61.3
KC2.5
1 2/05/07
50.2
KC2.5
1 2/05/07
50.3
KC2.5
1 2/05/07
55.7
KC2.5
1 2/05/07
66.2
KC2.5
1 2/05/07
76.4
KC2.5
1 2/05/07
80
KC2.5
1 2/05/07
67.5
KC2.5
1 2/05/07
62.5
KC2.5
1 2/05/07
54.6
KC2.5
1 2/05/07
55.5
KC2.5
1 2/05/07
57.3
KC2.5
1 2/05/07
69.6
KC2.5
1 2/05/07
77
KC2.5
1 2/05/07
78.9
KC2.5
1 2/05/07
66
KC2.5
1 2/05/07
60.8
KC2.5
1 2/05/07
58
KC2.5
1 2/05/07
59.4
KC2.5
1 2/05/07
68.4
KC2.5
1 2/05/07
76
KC2.5
1 2/05/07
77.3
KC2.5
1 2/05/07
66.4
KC2.5
1 2/05/07
64.8
KC2.5
1 2/05/07
58.9
KC2.5
1 2/05/07
66.6
KC2.5
1 2/05/07
75
KC2.5
1 2/05/07
78.3
KC2.5
1 2/05/07
64.7
F-320

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/05/07
63.4
KC2.5
1 2/05/07
69.3
KC2.5
1 2/05/07
63
KC2.5
1 2/05/07
63.3
KC2.5
1 2/05/07
68.4
KC2.5
1 2/05/07
79.4
KC2.5
1 2/05/07
73.7
KC2.5
1 2/05/07
65.3
KC2.5
1 2/05/07
59.4
KC2.5
1 2/05/07
53.5
KC2.5
1 2/05/07
53.8
KC2.5
1 2/05/07
60.6
KC2.5
1 2/05/07
70.3
KC2.5
1 2/05/07
76.6
KC2.5
1 2/05/07
77
KC2.5
1 2/05/07
65.2
KC2.5
1 2/05/07
61.5
KC2.5
1 2/05/07
56.7
KC2.5
1 2/05/07
58.3
KC2.5
1 2/05/07
67.4
KC2.5
1 2/05/07
75.8
KC2.5
1 2/05/07
67
KC2.5
1 2/05/07
62.8
KC2.5
1 2/05/07
61.2
KC2.5
1 2/05/07
70.6
KC2.5
1 2/05/07
77.7
KC2.5
1 2/05/07
76.4
KC2.5
1 2/05/07
72
KC2.5
1 2/05/07
63.9
KC2.5
1 2/05/07
59.1
KC2.5
1 2/05/07
59.4
KC2.5
1 2/05/07
62.1
KC2.5
1 2/05/07
70
KC2.5
1 2/05/07
80.5
KC2.5
1 2/05/07
84.7
KC2.5
1 2/05/07
73.1
KC2.5
1 2/05/07
58.8
KC2.5
1 2/05/07
69.8
KC2.5
1 2/05/07
148.9
KC2.5
1 2/05/07
144.1
KC2.5
1 2/05/07
60.5
KC2.5
1 2/05/07
64
KC2.5
1 2/06/07
62.1
KC2.5
1 2/06/07
56.5
KC2.5
1 2/06/07
59.2
F-321

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/06/07
51.8
KC2.5
1 2/06/07
54.5
KC2.5
1 2/06/07
65
KC2.5
1 2/06/07
73.1
KC2.5
1 2/06/07
82
KC2.5
1 2/06/07
95.1
KC2.5
1 2/06/07
91.4
KC2.5
1 2/06/07
77.4
KC2.5
1 2/06/07
72
KC2.5
1 2/06/07
63.6
KC2.5
1 2/06/07
61.6
KC2.5
1 2/06/07
57.7
KC2.5
1 2/06/07
55.1
KC2.5
1 2/06/07
50.8
KC2.5
1 2/06/07
48.1
KC2.5
1 2/06/07
51.8
KC2.5
1 2/06/07
55.6
KC2.5
1 2/06/07
65.9
KC2.5
1 2/06/07
70.1
KC2.5
1 2/06/07
70.8
KC2.5
1 2/06/07
57.3
KC2.5
1 2/06/07
57
KC2.5
1 2/06/07
56.2
KC2.5
1 2/06/07
66.2
KC2.5
1 2/06/07
73
KC2.5
1 2/06/07
76.7
KC2.5
1 2/06/07
86.3
KC2.5
1 2/06/07
70.6
KC2.5
1 2/06/07
59.1
KC2.5
1 2/06/07
54.6
KC2.5
1 2/06/07
55.2
KC2.5
1 2/06/07
60.8
KC2.5
1 2/06/07
69.3
KC2.5
1 2/06/07
78.6
KC2.5
1 2/06/07
79.8
KC2.5
1 2/06/07
96
KC2.5
1 2/06/07
93.5
KC2.5
1 2/06/07
83.6
KC2.5
1 2/06/07
65.7
KC2.5
1 2/06/07
53.2
KC2.5
1 2/06/07
55.6
KC2.5
1 2/06/07
58.1
KC2.5
1 2/06/07
65.7
KC2.5
1 2/06/07
68.4
KC2.5
1 2/06/07
70.2
F-322

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/06/07
67.3
KC2.5
1 2/06/07
57.3
KC2.5
1 2/06/07
52
KC2.5
1 2/06/07
57.4
KC2.5
1 2/06/07
60
KC2.5
1 2/06/07
64.2
KC2.5
1 2/06/07
75.6
KC2.5
1 2/06/07
104.5
KC2.5
1 2/06/07
137.7
KC2.5
1 2/06/07
86.2
KC2.5
1 2/06/07
60.9
KC2.5
1 2/06/07
50
KC2.5
1 2/06/07
49.8
KC2.5
1 2/06/07
56.9
KC2.5
1 2/06/07
63.9
KC2.5
1 2/06/07
69.9
KC2.5
1 2/06/07
65.5
KC2.5
1 2/06/07
55.7
KC2.5
1 2/06/07
50.6
KC2.5
1 2/06/07
47.8
KC2.5
1 2/06/07
57.3
KC2.5
1 2/06/07
62
KC2.5
1 2/06/07
61
KC2.5
1 2/06/07
49.5
KC2.5
1 2/06/07
47.7
KC2.5
1 2/06/07
43.7
KC2.5
1 2/06/07
49.7
KC2.5
1 2/06/07
50.9
KC2.5
1 2/06/07
59.3
KC2.5
1 2/06/07
72.8
KC2.5
1 2/06/07
62.7
KC2.5
1 2/06/07
54.1
KC2.5
1 2/06/07
48.7
KC2.5
1 2/06/07
52.4
KC2.5
1 2/06/07
57.7
KC2.5
1 2/06/07
64.2
KC2.5
1 2/06/07
75.8
KC2.5
1 2/06/07
102.6
KC2.5
1 2/06/07
96.1
KC2.5
1 2/06/07
60.4
KC2.5
1 2/06/07
44.7
KC2.5
1 2/06/07
33
KC2.5
1 2/06/07
1.8
KC2.5
1 2/06/07
65.5
KC2.5
1 2/07/07
55.5
F-323

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/07/07
53.3
KC2.5
1 2/07/07
53.1
KC2.5
1 2/07/07
52.6
KC2.5
1 2/07/07
53.8
KC2.5
1 2/07/07
57.1
KC2.5
1 2/07/07
54
KC2.5
1 2/07/07
53.6
KC2.5
1 2/07/07
39.3
KC2.5
1 2/07/07
39.6
KC2.5
1 2/07/07
41.4
KC2.5
1 2/07/07
61.2
KC2.5
1 2/07/07
115.1
KC2.5
1 2/07/07
348.1
KC2.5
1 2/07/07
251.4
KC2.5
1 2/07/07
46.7
KC2.5
1 2/07/07
47.7
KC2.5
1 2/07/07
51.7
KC2.5
1 2/07/07
48.2
KC2.5
1 2/07/07
47.1
KC2.5
1 2/07/07
46.1
KC2.5
1 2/07/07
48.2
KC2.5
1 2/07/07
53.2
KC2.5
1 2/07/07
66
KC2.5
1 2/07/07
68.1
KC2.5
1 2/07/07
53.4
KC2.5
1 2/07/07
51.4
KC2.5
1 2/07/07
50.7
KC2.5
1 2/07/07
62.9
KC2.5
1 2/07/07
67.2
KC2.5
1 2/07/07
60.6
KC2.5
1 2/07/07
53.9
KC2.5
1 2/07/07
50.5
KC2.5
1 2/07/07
53.8
KC2.5
1 2/07/07
68.4
KC2.5
1 2/07/07
72.4
KC2.5
1 2/07/07
61.5
KC2.5
1 2/07/07
55.3
KC2.5
1 2/07/07
50.7
KC2.5
1 2/07/07
50.9
KC2.5
1 2/07/07
57.4
KC2.5
1 2/07/07
69.7
KC2.5
1 2/07/07
70.1
KC2.5
1 2/07/07
50.6
KC2.5
1 2/07/07
51.2
KC2.5
1 2/07/07
57.2
F-324

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/07/07
70
KC2.5
1 2/07/07
77.7
KC2.5
1 2/07/07
69.4
KC2.5
1 2/07/07
61.2
KC2.5
1 2/07/07
59.6
KC2.5
1 2/07/07
53.8
KC2.5
1 2/07/07
57.3
KC2.5
1 2/07/07
68.5
KC2.5
1 2/07/07
74
KC2.5
1 2/07/07
66.1
KC2.5
1 2/07/07
60.9
KC2.5
1 2/07/07
54.3
KC2.5
1 2/07/07
58.2
KC2.5
1 2/07/07
98.2
KC2.5
1 2/07/07
72.3
KC2.5
1 2/07/07
69.1
KC2.5
1 2/07/07
61.3
KC2.5
1 2/07/07
51.9
KC2.5
1 2/07/07
53.1
KC2.5
1 2/07/07
65.8
KC2.5
1 2/07/07
98.9
KC2.5
1 2/07/07
154.7
KC2.5
1 2/07/07
191.5
KC2.5
1 2/07/07
336.2
KC2.5
1 2/07/07
208.7
KC2.5
1 2/07/07
41.6
KC2.5
1 2/07/07
43.3
KC2.5
1 2/07/07
47.9
KC2.5
1 2/07/07
49.7
KC2.5
1 2/07/07
54.4
KC2.5
1 2/07/07
55
KC2.5
1 2/07/07
59.9
KC2.5
1 2/07/07
51.7
KC2.5
1 2/07/07
52.4
KC2.5
1 2/07/07
53.4
KC2.5
1 2/07/07
57.1
KC2.5
1 2/07/07
51.6
KC2.5
1 2/07/07
60.2
KC2.5
1 2/07/07
65.4
KC2.5
1 2/07/07
72.3
KC2.5
1 2/07/07
69.2
KC2.5
1 2/07/07
67.1
KC2.5
1 2/07/07
55.8
KC2.5
1 2/07/07
49.2
KC2.5
1 2/07/07
54.5
F-325

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/07/07
64.6
KC2.5
1 2/07/07
63.3
KC2.5
1 2/08/07
59.6
KC2.5
1 2/08/07
64.8
KC2.5
1 2/08/07
64.3
KC2.5
1 2/08/07
65.3
KC2.5
1 2/08/07
64.8
KC2.5
1 2/08/07
64.6
KC2.5
1 2/08/07
62.8
KC2.5
1 2/08/07
68.3
KC2.5
1 2/08/07
66.8
KC2.5
1 2/08/07
50.2
KC2.5
1 2/08/07
53
KC2.5
1 2/08/07
59.8
KC2.5
1 2/08/07
60.5
KC2.5
1 2/08/07
58.6
KC2.5
1 2/08/07
61.1
KC2.5
1 2/08/07
60.9
KC2.5
1 2/08/07
64.9
KC2.5
1 2/08/07
69
KC2.5
1 2/08/07
69
KC2.5
1 2/08/07
67.2
KC2.5
1 2/08/07
68.4
KC2.5
1 2/08/07
83.8
KC2.5
1 2/08/07
107.2
KC2.5
1 2/08/07
79.6
KC2.5
1 2/08/07
79
KC2.5
1 2/08/07
62.3
KC2.5
1 2/08/07
62.5
KC2.5
1 2/08/07
63.1
KC2.5
1 2/08/07
65.3
KC2.5
1 2/08/07
67
KC2.5
1 2/08/07
68.3
KC2.5
1 2/08/07
68.2
KC2.5
1 2/08/07
71.9
KC2.5
1 2/08/07
70.7
KC2.5
1 2/08/07
66.5
KC2.5
1 2/08/07
60
KC2.5
1 2/08/07
56
KC2.5
1 2/08/07
57.1
KC2.5
1 2/08/07
55.9
KC2.5
1 2/08/07
56.4
KC2.5
1 2/08/07
59.8
KC2.5
1 2/08/07
61.3
KC2.5
1 2/08/07
60
F-326

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/08/07
60
KC2.5
1 2/08/07
64
KC2.5
1 2/08/07
65.3
KC2.5
1 2/08/07
61.6
KC2.5
1 2/08/07
65.5
KC2.5
1 2/08/07
59.9
KC2.5
1 2/08/07
57.1
KC2.5
1 2/08/07
52.5
KC2.5
1 2/08/07
58.4
KC2.5
1 2/08/07
56.6
KC2.5
1 2/08/07
60
KC2.5
1 2/08/07
63.2
KC2.5
1 2/08/07
63.2
KC2.5
1 2/08/07
58.4
KC2.5
1 2/08/07
64.8
KC2.5
1 2/08/07
70
KC2.5
1 2/08/07
61.6
KC2.5
1 2/08/07
49
KC2.5
1 2/08/07
49.4
KC2.5
1 2/08/07
49.7
KC2.5
1 2/08/07
52.3
KC2.5
1 2/08/07
52.9
KC2.5
1 2/08/07
53.3
KC2.5
1 2/08/07
59.1
KC2.5
1 2/08/07
69.6
KC2.5
1 2/08/07
74.8
KC2.5
1 2/08/07
63.1
KC2.5
1 2/08/07
53.3
KC2.5
1 2/08/07
56.2
KC2.5
1 2/08/07
57.1
KC2.5
1 2/08/07
58.8
KC2.5
1 2/08/07
64.6
KC2.5
1 2/08/07
63.7
KC2.5
1 2/08/07
62.7
KC2.5
1 2/08/07
61.5
KC2.5
1 2/08/07
62.2
KC2.5
1 2/08/07
63.4
KC2.5
1 2/08/07
59.4
KC2.5
1 2/08/07
60.6
KC2.5
1 2/08/07
60.6
KC2.5
1 2/08/07
53.1
KC2.5
1 2/08/07
46.9
KC2.5
1 2/08/07
42.1
KC2.5
1 2/08/07
46.7
KC2.5
1 2/08/07
152
F-327

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/08/07
54.4
KC2.5
1 2/08/07
59.2
KC2.5
1 2/09/07
60.8
KC2.5
1 2/09/07
57.2
KC2.5
1 2/09/07
57
KC2.5
1 2/09/07
56.2
KC2.5
1 2/09/07
62.7
KC2.5
1 2/09/07
60.6
KC2.5
1 2/09/07
55.9
KC2.5
1 2/09/07
56.8
KC2.5
1 2/09/07
56.3
KC2.5
1 2/09/07
57.8
KC2.5
1 2/09/07
59.5
KC2.5
1 2/09/07
58.9
KC2.5
1 2/09/07
59.1
KC2.5
1 2/09/07
61.9
KC2.5
1 2/09/07
66.6
KC2.5
1 2/09/07
63.5
KC2.5
1 2/09/07
65.6
KC2.5
1 2/09/07
68.4
KC2.5
1 2/09/07
73.7
KC2.5
1 2/09/07
69.1
KC2.5
1 2/09/07
57.1
KC2.5
1 2/09/07
62.1
KC2.5
1 2/09/07
66.8
KC2.5
1 2/09/07
70
KC2.5
1 2/09/07
72.4
KC2.5
1 2/09/07
70.4
KC2.5
1 2/09/07
68.3
KC2.5
1 2/09/07
58.3
KC2.5
1 2/09/07
56.3
KC2.5
1 2/09/07
61.3
KC2.5
1 2/09/07
64.2
KC2.5
1 2/09/07
59.7
KC2.5
1 2/09/07
51.2
KC2.5
1 2/09/07
47.6
KC2.5
1 2/09/07
46.9
KC2.5
1 2/09/07
59.6
KC2.5
1 2/18/07
59.5
KC2.5
1 2/18/07
65.8
KC2.5
1 2/18/07
72.4
KC2.5
1 2/18/07
74.5
KC2.5
1 2/18/07
150.7
KC2.5
1 2/19/07
71.5
KC2.5
1 2/19/07
70.7
F-328

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/19/07
93.3
KC2.5
1 2/19/07
150.9
KC2.5
1 2/19/07
174.4
KC2.5
1 2/19/07
118.8
KC2.5
1 2/19/07
84.1
KC2.5
1 2/19/07
87.2
KC2.5
1 2/19/07
77.7
KC2.5
1 2/19/07
59.5
KC2.5
1 2/19/07
69.6
KC2.5
1 2/19/07
125.8
KC2.5
1 2/19/07
184.6
KC2.5
1 2/19/07
177.1
KC2.5
1 2/19/07
143.4
KC2.5
1 2/19/07
137.7
KC2.5
1 2/19/07
149.3
KC2.5
1 2/19/07
134.1
KC2.5
1 2/19/07
120.4
KC2.5
1 2/19/07
118.6
KC2.5
1 2/19/07
100.7
KC2.5
1 2/19/07
98.1
KC2.5
1 2/19/07
96
KC2.5
1 2/19/07
91.8
KC2.5
1 2/19/07
87
KC2.5
1 2/19/07
89.5
KC2.5
1 2/19/07
89.8
KC2.5
1 2/19/07
97.3
KC2.5
1 2/19/07
123.4
KC2.5
1 2/19/07
159.2
KC2.5
1 2/19/07
165.4
KC2.5
1 2/19/07
139.1
KC2.5
1 2/19/07
104.7
KC2.5
1 2/19/07
104.2
KC2.5
1 2/19/07
105.8
KC2.5
1 2/19/07
97
KC2.5
1 2/19/07
87.5
KC2.5
1 2/19/07
92.6
KC2.5
1 2/19/07
95.2
KC2.5
1 2/19/07
106.6
KC2.5
1 2/19/07
120.6
KC2.5
1 2/19/07
101.6
KC2.5
1 2/19/07
101.8
KC2.5
1 2/19/07
105.9
KC2.5
1 2/19/07
137.8
KC2.5
1 2/19/07
121.9
KC2.5
1 2/19/07
89.9
F-329

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/19/07
85
KC2.5
1 2/19/07
86.9
KC2.5
1 2/19/07
84.4
KC2.5
1 2/19/07
84.1
KC2.5
1 2/19/07
77.7
KC2.5
1 2/19/07
78.5
KC2.5
1 2/19/07
75.6
KC2.5
1 2/19/07
82
KC2.5
1 2/19/07
97.8
KC2.5
1 2/19/07
128.4
KC2.5
1 2/19/07
94.4
KC2.5
1 2/19/07
38.5
KC2.5
1 2/19/07
49.3
KC2.5
1 2/19/07
95.3
KC2.5
1 2/19/07
107.9
KC2.5
1 2/19/07
40.1
KC2.5
1 2/19/07
32
KC2.5
1 2/19/07
34.2
KC2.5
1 2/19/07
41.9
KC2.5
1 2/19/07
50.3
KC2.5
1 2/19/07
57.3
KC2.5
1 2/19/07
68.4
KC2.5
1 2/19/07
90.3
KC2.5
1 2/19/07
145.5
KC2.5
1 2/19/07
125.5
KC2.5
1 2/19/07
54.4
KC2.5
1 2/19/07
31
KC2.5
1 2/19/07
39.8
KC2.5
1 2/19/07
65
KC2.5
1 2/19/07
191.4
KC2.5
1 2/19/07
330.6
KC2.5
1 2/19/07
305.4
KC2.5
1 2/19/07
31.1
KC2.5
1 2/19/07
30.3
KC2.5
1 2/19/07
35.9
KC2.5
1 2/19/07
59.9
KC2.5
1 2/19/07
155.5
KC2.5
1 2/19/07
274.2
KC2.5
1 2/19/07
57.8
KC2.5
1 2/19/07
33.6
KC2.5
1 2/19/07
39.2
KC2.5
1 2/19/07
66
KC2.5
1 2/19/07
94.3
KC2.5
1 2/19/07
45.3
KC2.5
1 2/19/07
77.3
F-330

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/19/07
98.2
KC2.5
1 2/20/07
92.6
KC2.5
1 2/20/07
91.4
KC2.5
1 2/20/07
93
KC2.5
1 2/20/07
91.4
KC2.5
1 2/20/07
97.6
KC2.5
1 2/20/07
89.4
KC2.5
1 2/20/07
72.9
KC2.5
1 2/20/07
69.2
KC2.5
1 2/20/07
61.9
KC2.5
1 2/20/07
63.3
KC2.5
1 2/20/07
57.7
KC2.5
1 2/20/07
58
KC2.5
1 2/20/07
58.2
KC2.5
1 2/20/07
63
KC2.5
1 2/20/07
63
KC2.5
1 2/20/07
64.1
KC2.5
1 2/20/07
64.2
KC2.5
1 2/20/07
81
KC2.5
1 2/20/07
115.1
KC2.5
1 2/20/07
95.8
KC2.5
1 2/20/07
72.6
KC2.5
1 2/20/07
73.5
KC2.5
1 2/20/07
68.7
KC2.5
1 2/20/07
66.2
KC2.5
1 2/20/07
60.2
KC2.5
1 2/20/07
60.8
KC2.5
1 2/20/07
62.2
KC2.5
1 2/20/07
60.6
KC2.5
1 2/20/07
60.4
KC2.5
1 2/20/07
59.8
KC2.5
1 2/20/07
56.4
KC2.5
1 2/20/07
72.2
KC2.5
1 2/20/07
97.3
KC2.5
1 2/20/07
92.1
KC2.5
1 2/20/07
47.7
KC2.5
1 2/20/07
62.2
KC2.5
1 2/20/07
111.2
KC2.5
1 2/20/07
139.1
KC2.5
1 2/20/07
130.5
KC2.5
1 2/20/07
53
KC2.5
1 2/20/07
52.9
KC2.5
1 2/20/07
99.8
KC2.5
1 2/20/07
136
KC2.5
1 2/20/07
113
F-331

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/20/07
66.5
KC2.5
1 2/20/07
87.3
KC2.5
1 2/20/07
147.8
KC2.5
1 2/20/07
139.2
KC2.5
1 2/20/07
114.6
KC2.5
1 2/20/07
103.1
KC2.5
1 2/20/07
102
KC2.5
1 2/20/07
98.3
KC2.5
1 2/20/07
89.7
KC2.5
1 2/20/07
84.2
KC2.5
1 2/20/07
82.8
KC2.5
1 2/20/07
87.6
KC2.5
1 2/20/07
85.4
KC2.5
1 2/20/07
86.3
KC2.5
1 2/20/07
81.7
KC2.5
1 2/20/07
80.4
KC2.5
1 2/20/07
76
KC2.5
1 2/20/07
82.9
KC2.5
1 2/20/07
92.4
KC2.5
1 2/20/07
166.6
KC2.5
1 2/20/07
90.7
KC2.5
1 2/20/07
70.1
KC2.5
1 2/20/07
72.2
KC2.5
1 2/20/07
77.5
KC2.5
1 2/20/07
86
KC2.5
1 2/20/07
113.5
KC2.5
1 2/20/07
112.8
KC2.5
1 2/20/07
90
KC2.5
1 2/20/07
71.9
KC2.5
1 2/20/07
68.9
KC2.5
1 2/20/07
68.9
KC2.5
1 2/20/07
63.8
KC2.5
1 2/20/07
64.2
KC2.5
1 2/20/07
63.7
KC2.5
1 2/20/07
69.8
KC2.5
1 2/20/07
81.3
KC2.5
1 2/20/07
100.1
KC2.5
1 2/20/07
121.9
KC2.5
1 2/20/07
119.9
KC2.5
1 2/20/07
77.7
KC2.5
1 2/20/07
69.8
KC2.5
1 2/20/07
65.6
KC2.5
1 2/20/07
63.8
KC2.5
1 2/20/07
56.4
KC2.5
1 2/20/07
51.2
F-332

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/20/07
46.8
KC2.5
1 2/20/07
58
KC2.5
1 2/20/07
144.2
KC2.5
12/21/07
65.5
KC2.5
12/21/07
66
KC2.5
12/21/07
64.8
KC2.5
12/21/07
64.4
KC2.5
12/21/07
65.2
KC2.5
12/21/07
64.2
KC2.5
12/21/07
65.4
KC2.5
12/21/07
63.6
KC2.5
12/21/07
66.9
KC2.5
12/21/07
63.6
KC2.5
12/21/07
66.1
KC2.5
12/21/07
65.5
KC2.5
12/21/07
62.7
KC2.5
12/21/07
64
KC2.5
12/21/07
62.1
KC2.5
12/21/07
64.3
KC2.5
12/21/07
63.1
KC2.5
12/21/07
62.7
KC2.5
12/21/07
59.8
KC2.5
12/21/07
58.5
KC2.5
12/21/07
63.6
KC2.5
12/21/07
68.5
KC2.5
12/21/07
59.5
KC2.5
12/21/07
62.6
KC2.5
12/21/07
73
KC2.5
12/21/07
74.7
KC2.5
12/21/07
69.1
KC2.5
12/21/07
56.6
KC2.5
12/21/07
55.5
KC2.5
12/21/07
56.8
KC2.5
12/21/07
62.9
KC2.5
12/21/07
79.9
KC2.5
12/21/07
86.9
KC2.5
12/21/07
64.5
KC2.5
12/21/07
55.2
KC2.5
12/21/07
52.4
KC2.5
12/21/07
49.5
KC2.5
12/21/07
46.2
KC2.5
12/21/07
49
KC2.5
12/21/07
46.7
KC2.5
12/21/07
75.2
KC2.5
12/21/07
77.4
F-333

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
12/21/07
94.2
KC2.5
12/21/07
72.7
KC2.5
12/21/07
62.4
KC2.5
12/21/07
50.3
KC2.5
12/21/07
35.9
KC2.5
12/21/07
51.4
KC2.5
12/21/07
95.3
KC2.5
12/21/07
93.9
KC2.5
12/22/07
40.9
KC2.5
12/22/07
41.7
KC2.5
12/22/07
40
KC2.5
12/22/07
39.2
KC2.5
12/22/07
39
KC2.5
12/22/07
37
KC2.5
12/22/07
37.1
KC2.5
12/22/07
39.5
KC2.5
12/22/07
42.1
KC2.5
12/22/07
46.6
KC2.5
12/22/07
51.4
KC2.5
12/22/07
61.6
KC2.5
12/22/07
51.4
KC2.5
12/22/07
50.6
KC2.5
12/22/07
48.1
KC2.5
12/22/07
45.4
KC2.5
12/22/07
48.8
KC2.5
12/22/07
55.4
KC2.5
12/22/07
69.4
KC2.5
12/22/07
76.1
KC2.5
12/22/07
64.8
KC2.5
12/22/07
58.6
KC2.5
12/22/07
62.6
KC2.5
12/22/07
61.2
KC2.5
12/22/07
69.6
KC2.5
12/22/07
85.2
KC2.5
12/22/07
95.7
KC2.5
12/22/07
85.5
KC2.5
12/22/07
88.1
KC2.5
12/22/07
99.1
KC2.5
12/22/07
108
KC2.5
12/22/07
110.3
KC2.5
12/22/07
107.1
KC2.5
12/22/07
105.9
KC2.5
12/22/07
98.7
KC2.5
12/22/07
86.7
KC2.5
12/22/07
81.3
F-334

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
12/22/07
73.8
KC2.5
12/22/07
66.1
KC2.5
12/22/07
63.4
KC2.5
12/22/07
58.2
KC2.5
12/22/07
59.3
KC2.5
12/22/07
63.3
KC2.5
12/22/07
55.4
KC2.5
12/22/07
36.7
KC2.5
12/22/07
32.9
KC2.5
12/22/07
43.4
KC2.5
12/22/07
159.7
KC2.5
12/22/07
265.9
KC2.5
12/22/07
260.3
KC2.5
12/22/07
378.2
KC2.5
12/22/07
695.7
KC2.5
12/23/07
41
KC2.5
12/23/07
40.3
KC2.5
12/23/07
41.1
KC2.5
12/23/07
41.3
KC2.5
12/23/07
42.4
KC2.5
12/23/07
39
KC2.5
12/23/07
39.6
KC2.5
12/23/07
34.7
KC2.5
12/23/07
30.3
KC2.5
12/23/07
24.8
KC2.5
12/23/07
22.6
KC2.5
12/23/07
20
KC2.5
12/23/07
20.8
KC2.5
12/23/07
32.8
KC2.5
12/23/07
33.4
KC2.5
12/23/07
31.6
KC2.5
12/23/07
34.1
KC2.5
12/23/07
31.5
KC2.5
12/23/07
34.6
KC2.5
12/23/07
31.9
KC2.5
12/23/07
32.7
KC2.5
12/23/07
32.8
KC2.5
12/23/07
30.6
KC2.5
12/23/07
32.3
KC2.5
12/23/07
33.3
KC2.5
12/23/07
32.7
KC2.5
12/23/07
35.4
KC2.5
12/23/07
35
KC2.5
12/23/07
36.8
KC2.5
12/23/07
36.2
F-335

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
12/23/07
35.5
KC2.5
12/23/07
35.4
KC2.5
12/23/07
35.7
KC2.5
12/23/07
32
KC2.5
12/23/07
33.9
KC2.5
12/23/07
34.1
KC2.5
12/23/07
40.1
KC2.5
12/23/07
40.3
KC2.5
12/23/07
36.6
KC2.5
12/23/07
28.8
KC2.5
12/23/07
29.2
KC2.5
12/23/07
43.2
KC2.5
12/23/07
35.1
KC2.5
1 2/24/07
40
KC2.5
1 2/26/07
32.3
KC2.5
1 2/26/07
35.5
KC2.5
1 2/26/07
35.6
KC2.5
1 2/26/07
39.1
KC2.5
1 2/26/07
44.4
KC2.5
1 2/26/07
42.2
KC2.5
1 2/26/07
40.3
KC2.5
1 2/26/07
40.4
KC2.5
1 2/26/07
38.1
KC2.5
1 2/26/07
34.8
KC2.5
1 2/26/07
34.6
KC2.5
1 2/26/07
35.5
KC2.5
1 2/26/07
37.3
KC2.5
1 2/26/07
40
KC2.5
1 2/26/07
43.4
KC2.5
1 2/26/07
41.6
KC2.5
1 2/26/07
41.8
KC2.5
1 2/26/07
56.8
KC2.5
12/27/07
37.9
KC2.5
12/27/07
44
KC2.5
12/27/07
45.8
KC2.5
12/27/07
41.2
KC2.5
12/27/07
38.3
KC2.5
12/27/07
39.2
KC2.5
12/27/07
44.1
KC2.5
12/27/07
48.7
KC2.5
12/27/07
52.8
KC2.5
12/27/07
55.8
KC2.5
12/27/07
65.7
KC2.5
12/27/07
93.9
KC2.5
12/27/07
233.1
F-336

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
12/27/07
130.7
KC2.5
12/27/07
61
KC2.5
12/27/07
52.6
KC2.5
12/27/07
47.7
KC2.5
12/27/07
41.8
KC2.5
12/27/07
42.8
KC2.5
12/27/07
55.8
KC2.5
12/27/07
7.4
KC2.5
12/27/07
7.3
KC2.5
12/27/07
7.4
KC2.5
12/27/07
34.6
KC2.5
1 2/28/07
36.5
KC2.5
1 2/28/07
42.3
KC2.5
1 2/28/07
36.6
KC2.5
1 2/28/07
33.5
KC2.5
1 2/28/07
36
KC2.5
1 2/28/07
33.8
KC2.5
1 2/28/07
37.4
KC2.5
1 2/28/07
69.4
KC2.5
1 2/28/07
89.2
KC2.5
1 2/28/07
42.8
KC2.5
1 2/28/07
41.1
KC2.5
1 2/28/07
39.1
KC2.5
1 2/28/07
37.8
KC2.5
1 2/28/07
40.8
KC2.5
1 2/28/07
38.7
KC2.5
1 2/28/07
38.6
KC2.5
1 2/28/07
39.5
KC2.5
1 2/28/07
36
KC2.5
1 2/28/07
38.2
KC2.5
1 2/28/07
36
KC2.5
1 2/28/07
35.7
KC2.5
1 2/28/07
36.2
KC2.5
1 2/28/07
34.5
KC2.5
1 2/28/07
36
KC2.5
1 2/28/07
32.4
KC2.5
1 2/28/07
31.6
KC2.5
1 2/28/07
36
KC2.5
1 2/28/07
34.6
KC2.5
1 2/28/07
35.8
KC2.5
1 2/28/07
38.2
KC2.5
1 2/28/07
36.1
KC2.5
1 2/28/07
35.9
KC2.5
1 2/28/07
34.2
KC2.5
1 2/28/07
27.2
F-337

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/28/07
22.9
KC2.5
1 2/28/07
18.7
KC2.5
1 2/28/07
17
KC2.5
1 2/28/07
13.5
KC2.5
1 2/28/07
22.8
KC2.5
1 2/28/07
37.1
KC2.5
1 2/28/07
36.6
KC2.5
1 2/28/07
33.8
KC2.5
1 2/28/07
32.8
KC2.5
1 2/28/07
33
KC2.5
1 2/28/07
31.6
KC2.5
1 2/28/07
37.4
KC2.5
1 2/28/07
39.2
KC2.5
1 2/28/07
39.2
KC2.5
1 2/28/07
38.2
KC2.5
1 2/28/07
33.6
KC2.5
1 2/28/07
35.2
KC2.5
1 2/28/07
37.4
KC2.5
1 2/28/07
41.2
KC2.5
1 2/28/07
45.1
KC2.5
1 2/28/07
45.3
KC2.5
1 2/28/07
42.3
KC2.5
1 2/28/07
40.7
KC2.5
1 2/28/07
36.8
KC2.5
1 2/28/07
36.5
KC2.5
1 2/28/07
33.4
KC2.5
1 2/28/07
34.5
KC2.5
1 2/28/07
34.3
KC2.5
1 2/28/07
37.5
KC2.5
1 2/28/07
36
KC2.5
1 2/28/07
29.3
KC2.5
1 2/28/07
34.5
KC2.5
1 2/28/07
27.5
KC2.5
1 2/28/07
218.7
KC2.5
1 2/28/07
36.3
KC2.5
1 2/28/07
36.9
KC2.5
1 2/29/07
31.8
KC2.5
1 2/29/07
33.1
KC2.5
1 2/29/07
32.1
KC2.5
1 2/29/07
27.9
KC2.5
1 2/29/07
25.9
KC2.5
1 2/29/07
31.9
KC2.5
1 2/29/07
29.1
KC2.5
1 2/29/07
34.6
KC2.5
1 2/29/07
40.3
F-338

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC2.5
1 2/29/07
82.1
KC2.5
1 2/29/07
99.7
KC2.5
1 2/29/07
34.5
KC2.5
1 2/29/07
32.6
KC2.5
1 2/29/07
35.3
KC2.5
1 2/29/07
37
KC2.5
1 2/29/07
34
KC2.5
1 2/29/07
34.7
KC2.5
1 2/29/07
36
KC2.5
1 2/29/07
36.6
KC2.5
1 2/29/07
32.7
KC2.5
1 2/29/07
30.4
KC2.5
1 2/29/07
35.7
KC2.5
1 2/29/07
34.8
KC2.5
1 2/29/07
34.4
KC2.5
1 2/29/07
37.9
KC2.5
1 2/29/07
33.3
KC2.5
1 2/29/07
32.5
KC2.5
1 2/29/07
33
KC2.5
1 2/29/07
35.9
KC2.5
1 2/29/07
34.5
KC2.5
1 2/29/07
34.3
KC2.5
1 2/29/07
38
KC2.5
1 2/29/07
33.5
KC2.5
1 2/29/07
32.5
KC2.5
1 2/29/07
34.2
KC2.5
1 2/29/07
30.9
KC2.5
1 2/29/07
31.1
KC2.5
1 2/29/07
33.2
KC2.5
1 2/29/07
33.1
KC2.5
1 2/29/07
31.5
KC2.5
1 2/29/07
32.8
KC2.5
1 2/29/07
35.1
KC2.5
1 2/29/07
32.4
KC2.5
1 2/29/07
30
KC2.5
1 2/29/07
27.1
KC2.5
1 2/29/07
23.6
KC2.5
1 2/29/07
22.5
KC2.5
1 2/29/07
25.6
KC2.5
1 2/29/07
30.9
KC2.5
1 2/29/07
30.1
KC2.5
1 2/29/07
34.4
KC3.1
1 2/02/07
63.2
KC3.1
1 2/02/07
65.4
KC3.1
1 2/02/07
63.7
F-339

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/02/07
64.4
KC3.1
1 2/02/07
65.1
KC3.1
1 2/02/07
62.9
KC3.1
1 2/02/07
63.6
KC3.1
1 2/02/07
64.8
KC3.1
1 2/02/07
62.4
KC3.1
1 2/02/07
62.7
KC3.1
1 2/02/07
64.3
KC3.1
1 2/02/07
63
KC3.1
1 2/02/07
65.5
KC3.1
1 2/02/07
67.7
KC3.1
1 2/02/07
65.1
KC3.1
1 2/02/07
67.3
KC3.1
1 2/02/07
65.2
KC3.1
1 2/02/07
65.4
KC3.1
1 2/02/07
67.7
KC3.1
1 2/02/07
65.5
KC3.1
1 2/02/07
64.9
KC3.1
1 2/02/07
66.3
KC3.1
1 2/02/07
64.8
KC3.1
1 2/02/07
64.6
KC3.1
1 2/02/07
64.6
KC3.1
1 2/02/07
62.7
KC3.1
1 2/02/07
63.1
KC3.1
1 2/02/07
59.8
KC3.1
1 2/02/07
62
KC3.1
1 2/02/07
57.3
KC3.1
1 2/02/07
57.2
KC3.1
1 2/02/07
59
KC3.1
1 2/02/07
56.7
KC3.1
1 2/02/07
55.7
KC3.1
1 2/02/07
55
KC3.1
1 2/02/07
54
KC3.1
1 2/02/07
52.1
KC3.1
1 2/02/07
51.6
KC3.1
1 2/02/07
50.7
KC3.1
1 2/02/07
48.9
KC3.1
1 2/02/07
46.7
KC3.1
1 2/02/07
45.7
KC3.1
1 2/02/07
44.3
KC3.1
1 2/02/07
43.7
KC3.1
1 2/03/07
82.3
KC3.1
1 2/03/07
76.7
KC3.1
1 2/03/07
82.6
KC3.1
1 2/03/07
77.7
F-340

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/03/07
83
KC3.1
1 2/03/07
81
KC3.1
1 2/03/07
80.4
KC3.1
1 2/03/07
85.1
KC3.1
1 2/03/07
79.2
KC3.1
1 2/03/07
82
KC3.1
1 2/03/07
76.5
KC3.1
1 2/03/07
75.2
KC3.1
1 2/03/07
76.7
KC3.1
1 2/03/07
72.4
KC3.1
1 2/03/07
78.2
KC3.1
1 2/03/07
72.2
KC3.1
1 2/03/07
70.7
KC3.1
1 2/03/07
76.1
KC3.1
1 2/03/07
73.8
KC3.1
1 2/03/07
74.5
KC3.1
1 2/03/07
76.3
KC3.1
1 2/03/07
77.2
KC3.1
1 2/03/07
79.8
KC3.1
1 2/03/07
78.1
KC3.1
1 2/03/07
77.9
KC3.1
1 2/03/07
77.4
KC3.1
1 2/03/07
80.6
KC3.1
1 2/03/07
81.1
KC3.1
1 2/03/07
82.8
KC3.1
1 2/03/07
85.4
KC3.1
1 2/03/07
81.3
KC3.1
1 2/03/07
79.4
KC3.1
1 2/03/07
80.2
KC3.1
1 2/03/07
81.1
KC3.1
1 2/03/07
77.7
KC3.1
1 2/03/07
77.7
KC3.1
1 2/03/07
79.2
KC3.1
1 2/03/07
75.2
KC3.1
1 2/03/07
94
KC3.1
1 2/03/07
72
KC3.1
1 2/03/07
78.5
KC3.1
1 2/03/07
74.2
KC3.1
1 2/03/07
82.2
KC3.1
1 2/03/07
78.3
KC3.1
1 2/03/07
83.9
KC3.1
1 2/03/07
81.2
KC3.1
1 2/03/07
85
KC3.1
1 2/03/07
73.5
KC3.1
1 2/03/07
71.5
F-341

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/03/07
79.4
KC3.1
1 2/03/07
75.6
KC3.1
1 2/03/07
80.4
KC3.1
1 2/03/07
77.5
KC3.1
1 2/03/07
79.4
KC3.1
1 2/03/07
73.7
KC3.1
1 2/03/07
81.6
KC3.1
1 2/03/07
79.2
KC3.1
1 2/03/07
84.6
KC3.1
1 2/03/07
79.5
KC3.1
1 2/03/07
83.6
KC3.1
1 2/03/07
80
KC3.1
1 2/03/07
83.8
KC3.1
1 2/03/07
79.9
KC3.1
1 2/03/07
83.5
KC3.1
1 2/03/07
80
KC3.1
1 2/03/07
84.7
KC3.1
1 2/03/07
81.3
KC3.1
1 2/03/07
80
KC3.1
1 2/03/07
74.5
KC3.1
1 2/03/07
76.7
KC3.1
1 2/03/07
81.8
KC3.1
1 2/03/07
79.7
KC3.1
1 2/03/07
80.5
KC3.1
1 2/03/07
76.9
KC3.1
1 2/03/07
80.3
KC3.1
1 2/03/07
74.3
KC3.1
1 2/03/07
72.8
KC3.1
1 2/03/07
68.5
KC3.1
1 2/03/07
69.3
KC3.1
1 2/03/07
74
KC3.1
1 2/03/07
69.9
KC3.1
1 2/03/07
71.8
KC3.1
1 2/03/07
73.9
KC3.1
1 2/03/07
71.3
KC3.1
1 2/03/07
169.2
KC3.1
1 2/03/07
77.1
KC3.1
1 2/03/07
79.6
KC3.1
1 2/03/07
65.6
KC3.1
1 2/03/07
68.8
KC3.1
1 2/03/07
162.8
KC3.1
1 2/03/07
61.8
KC3.1
1 2/03/07
63.4
KC3.1
1 2/03/07
63.5
KC3.1
1 2/03/07
62.8
F-342

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/03/07
65
KC3.1
1 2/03/07
63.5
KC3.1
1 2/04/07
63
KC3.1
1 2/04/07
64
KC3.1
1 2/04/07
64.4
KC3.1
1 2/04/07
63.4
KC3.1
1 2/04/07
64.6
KC3.1
1 2/04/07
64
KC3.1
1 2/04/07
63.4
KC3.1
1 2/04/07
62.5
KC3.1
1 2/04/07
62.4
KC3.1
1 2/04/07
62.6
KC3.1
1 2/04/07
64.9
KC3.1
1 2/04/07
64.2
KC3.1
1 2/04/07
63.9
KC3.1
1 2/04/07
65.5
KC3.1
1 2/04/07
65.5
KC3.1
1 2/04/07
66.3
KC3.1
1 2/04/07
68.8
KC3.1
1 2/04/07
68.2
KC3.1
1 2/04/07
67.8
KC3.1
1 2/04/07
65.3
KC3.1
1 2/04/07
63.8
KC3.1
1 2/04/07
66.2
KC3.1
1 2/04/07
65.9
KC3.1
1 2/04/07
66
KC3.1
1 2/04/07
68.3
KC3.1
1 2/04/07
68.5
KC3.1
1 2/04/07
67.5
KC3.1
1 2/04/07
68.2
KC3.1
1 2/04/07
68.3
KC3.1
1 2/04/07
67.7
KC3.1
1 2/04/07
68.6
KC3.1
1 2/04/07
66.9
KC3.1
1 2/04/07
70.7
KC3.1
1 2/04/07
79.6
KC3.1
1 2/04/07
110.8
KC3.1
1 2/04/07
66.2
KC3.1
1 2/04/07
69.7
KC3.1
1 2/04/07
92.7
KC3.1
1 2/04/07
67.8
KC3.1
1 2/04/07
64.6
KC3.1
1 2/04/07
68.1
KC3.1
1 2/04/07
66.4
KC3.1
1 2/04/07
65.8
F-343

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/04/07
71.4
KC3.1
1 2/04/07
67.3
KC3.1
1 2/04/07
66.4
KC3.1
1 2/04/07
67.9
KC3.1
1 2/04/07
66
KC3.1
1 2/04/07
65
KC3.1
1 2/04/07
67.7
KC3.1
1 2/04/07
83
KC3.1
1 2/04/07
69
KC3.1
1 2/04/07
63.6
KC3.1
1 2/04/07
67
KC3.1
1 2/04/07
64.4
KC3.1
1 2/04/07
66
KC3.1
1 2/04/07
69.3
KC3.1
1 2/04/07
68.3
KC3.1
1 2/04/07
71.9
KC3.1
1 2/04/07
67.7
KC3.1
1 2/04/07
69.8
KC3.1
1 2/04/07
65
KC3.1
1 2/04/07
66.3
KC3.1
1 2/04/07
68.1
KC3.1
1 2/04/07
66.1
KC3.1
1 2/04/07
69.6
KC3.1
1 2/04/07
68.4
KC3.1
1 2/04/07
67.9
KC3.1
1 2/04/07
68.5
KC3.1
1 2/04/07
64.5
KC3.1
1 2/04/07
64.2
KC3.1
1 2/04/07
64.9
KC3.1
1 2/04/07
58.3
KC3.1
1 2/04/07
62.8
KC3.1
1 2/04/07
64
KC3.1
1 2/04/07
66.1
KC3.1
1 2/04/07
68.6
KC3.1
1 2/04/07
69.7
KC3.1
1 2/04/07
65.8
KC3.1
1 2/04/07
63.1
KC3.1
1 2/04/07
67.3
KC3.1
1 2/04/07
68.2
KC3.1
1 2/04/07
69.9
KC3.1
1 2/04/07
74.7
KC3.1
1 2/04/07
72.8
KC3.1
1 2/04/07
70
KC3.1
1 2/04/07
67.6
KC3.1
1 2/04/07
70.3
F-344

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/04/07
69.3
KC3.1
1 2/04/07
72.9
KC3.1
1 2/04/07
157.1
KC3.1
1 2/04/07
79.3
KC3.1
1 2/04/07
81.3
KC3.1
1 2/04/07
76.7
KC3.1
1 2/04/07
81.3
KC3.1
1 2/04/07
77.5
KC3.1
1 2/05/07
61.2
KC3.1
1 2/05/07
63.6
KC3.1
1 2/05/07
61.4
KC3.1
1 2/05/07
61
KC3.1
1 2/05/07
64.6
KC3.1
1 2/05/07
62.8
KC3.1
1 2/05/07
62.7
KC3.1
1 2/05/07
65.1
KC3.1
1 2/05/07
61.7
KC3.1
1 2/05/07
60
KC3.1
1 2/05/07
57.4
KC3.1
1 2/05/07
57.1
KC3.1
1 2/05/07
60.8
KC3.1
1 2/05/07
134.6
KC3.1
1 2/05/07
63.4
KC3.1
1 2/05/07
62.6
KC3.1
1 2/05/07
63.8
KC3.1
1 2/05/07
63.5
KC3.1
1 2/05/07
63.2
KC3.1
12/11/07
28.9
KC3.1
12/11/07
27.6
KC3.1
12/11/07
27.8
KC3.1
12/11/07
28.3
KC3.1
12/11/07
29.6
KC3.1
12/11/07
29.5
KC3.1
12/11/07
29.8
KC3.1
12/11/07
34.1
KC3.1
12/11/07
56.8
KC3.1
12/11/07
54.4
KC3.1
1 2/1 7/07
41
KC3.1
1 2/1 7/07
40.1
KC3.1
1 2/1 7/07
40.3
KC3.1
1 2/1 7/07
40.3
KC3.1
1 2/1 7/07
40
KC3.1
1 2/1 7/07
40.6
KC3.1
1 2/1 7/07
40.4
KC3.1
1 2/1 7/07
40
F-345

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/1 7/07
40.5
KC3.1
1 2/1 7/07
42.2
KC3.1
1 2/1 7/07
40.3
KC3.1
1 2/1 7/07
40.2
KC3.1
1 2/1 7/07
39.8
KC3.1
1 2/1 7/07
39.9
KC3.1
1 2/1 7/07
39.5
KC3.1
1 2/1 7/07
38.9
KC3.1
1 2/1 7/07
38.4
KC3.1
1 2/1 7/07
37.7
KC3.1
1 2/1 7/07
36.4
KC3.1
1 2/1 7/07
34.7
KC3.1
1 2/1 7/07
33.5
KC3.1
1 2/1 7/07
31.8
KC3.1
1 2/1 7/07
30.6
KC3.1
1 2/1 7/07
30.4
KC3.1
1 2/1 7/07
30.5
KC3.1
1 2/1 7/07
30.7
KC3.1
1 2/1 7/07
30.3
KC3.1
1 2/1 7/07
29.9
KC3.1
1 2/1 7/07
29.1
KC3.1
1 2/1 7/07
27.2
KC3.1
1 2/1 7/07
25.1
KC3.1
1 2/1 7/07
22.6
KC3.1
1 2/1 7/07
22.7
KC3.1
1 2/1 7/07
55.6
KC3.1
1 2/18/07
39.5
KC3.1
1 2/18/07
39.6
KC3.1
1 2/18/07
40.4
KC3.1
1 2/18/07
41.7
KC3.1
1 2/18/07
42.1
KC3.1
1 2/18/07
42.5
KC3.1
1 2/18/07
44.2
KC3.1
1 2/18/07
44.2
KC3.1
1 2/18/07
42.7
KC3.1
1 2/18/07
43.8
KC3.1
1 2/18/07
46.1
KC3.1
1 2/18/07
46.3
KC3.1
1 2/18/07
49.3
KC3.1
1 2/18/07
50.5
KC3.1
1 2/18/07
50.8
KC3.1
1 2/18/07
49.8
KC3.1
1 2/18/07
50
KC3.1
1 2/18/07
49
KC3.1
1 2/18/07
48.6
F-346

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/18/07
48.7
KC3.1
1 2/18/07
48.5
KC3.1
1 2/18/07
49.1
KC3.1
1 2/18/07
50.3
KC3.1
1 2/18/07
49.6
KC3.1
1 2/18/07
48.2
KC3.1
1 2/18/07
47.9
KC3.1
1 2/18/07
47.7
KC3.1
1 2/18/07
47.5
KC3.1
1 2/18/07
47.6
KC3.1
1 2/18/07
48
KC3.1
1 2/18/07
48
KC3.1
1 2/18/07
46.1
KC3.1
1 2/18/07
42.4
KC3.1
1 2/18/07
40.2
KC3.1
1 2/18/07
40.7
KC3.1
1 2/18/07
40.9
KC3.1
1 2/18/07
40.4
KC3.1
1 2/18/07
39.6
KC3.1
1 2/18/07
40.1
KC3.1
1 2/18/07
40.9
KC3.1
1 2/18/07
41.1
KC3.1
1 2/18/07
40.7
KC3.1
1 2/18/07
34.9
KC3.1
1 2/18/07
36.3
KC3.1
1 2/18/07
36.9
KC3.1
1 2/18/07
37.3
KC3.1
1 2/18/07
37.4
KC3.1
1 2/18/07
36.9
KC3.1
1 2/18/07
36.9
KC3.1
1 2/18/07
33.9
KC3.1
1 2/18/07
31.3
KC3.1
1 2/18/07
31
KC3.1
1 2/18/07
31.1
KC3.1
1 2/18/07
31.2
KC3.1
1 2/18/07
31.3
KC3.1
1 2/18/07
29.4
KC3.1
1 2/18/07
31.3
KC3.1
1 2/18/07
23.8
KC3.1
1 2/18/07
33.9
KC3.1
1 2/19/07
66.3
KC3.1
1 2/19/07
68.6
KC3.1
1 2/19/07
68.2
KC3.1
1 2/19/07
68.3
KC3.1
1 2/19/07
66.7
F-347

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/19/07
66.4
KC3.1
1 2/19/07
67.9
KC3.1
1 2/19/07
69.5
KC3.1
1 2/19/07
68.3
KC3.1
1 2/19/07
66.6
KC3.1
1 2/19/07
66.2
KC3.1
1 2/19/07
62.6
KC3.1
1 2/19/07
60.8
KC3.1
1 2/19/07
59.5
KC3.1
1 2/19/07
58.3
KC3.1
1 2/19/07
48.3
KC3.1
1 2/19/07
45.7
KC3.1
1 2/19/07
41.8
KC3.1
1 2/19/07
40.4
KC3.1
1 2/19/07
44.2
KC3.1
1 2/19/07
43.9
KC3.1
1 2/19/07
44.9
KC3.1
1 2/19/07
45.3
KC3.1
1 2/19/07
44.2
KC3.1
1 2/19/07
44
KC3.1
1 2/19/07
44.5
KC3.1
1 2/19/07
45
KC3.1
1 2/19/07
44.7
KC3.1
1 2/19/07
44.5
KC3.1
1 2/19/07
45.1
KC3.1
1 2/19/07
44.6
KC3.1
1 2/19/07
44.8
KC3.1
1 2/19/07
44.1
KC3.1
1 2/19/07
45.9
KC3.1
1 2/19/07
42.2
KC3.1
1 2/19/07
39.5
KC3.1
1 2/19/07
40.4
KC3.1
1 2/19/07
39.2
KC3.1
1 2/19/07
37
KC3.1
1 2/19/07
37
KC3.1
1 2/19/07
35.9
KC3.1
1 2/19/07
34.1
KC3.1
1 2/19/07
32.7
KC3.1
1 2/19/07
32.2
KC3.1
1 2/19/07
32.1
KC3.1
1 2/19/07
35.2
KC3.1
1 2/19/07
33.4
KC3.1
1 2/19/07
31.9
KC3.1
1 2/19/07
30.2
KC3.1
1 2/19/07
29.2
F-348

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/19/07
28.9
KC3.1
1 2/19/07
30.1
KC3.1
1 2/19/07
32
KC3.1
1 2/19/07
30.5
KC3.1
1 2/19/07
23
KC3.1
1 2/19/07
37.9
KC3.1
1 2/19/07
37.3
KC3.1
1 2/19/07
37.4
KC3.1
1 2/19/07
37.9
KC3.1
1 2/19/07
37.9
KC3.1
1 2/19/07
39.2
KC3.1
1 2/19/07
39.7
KC3.1
1 2/19/07
41.4
KC3.1
1 2/19/07
42.6
KC3.1
1 2/19/07
42.7
KC3.1
1 2/19/07
43.5
KC3.1
1 2/19/07
42.9
KC3.1
1 2/19/07
40.6
KC3.1
1 2/19/07
40.4
KC3.1
1 2/19/07
39.7
KC3.1
1 2/19/07
39.9
KC3.1
1 2/19/07
53.1
KC3.1
1 2/19/07
38.9
KC3.1
1 2/19/07
35.6
KC3.1
1 2/19/07
50.4
KC3.1
1 2/19/07
37.2
KC3.1
1 2/19/07
39.5
KC3.1
1 2/19/07
37.4
KC3.1
1 2/19/07
37.9
KC3.1
1 2/19/07
39
KC3.1
1 2/20/07
76.8
KC3.1
1 2/20/07
60.6
KC3.1
1 2/20/07
59.4
KC3.1
1 2/20/07
61.8
KC3.1
1 2/20/07
60.3
KC3.1
1 2/20/07
60.6
KC3.1
1 2/20/07
60.9
KC3.1
1 2/20/07
60.4
KC3.1
1 2/20/07
60.6
KC3.1
1 2/20/07
61.7
KC3.1
1 2/20/07
62.2
KC3.1
1 2/20/07
61.1
KC3.1
1 2/20/07
62.9
KC3.1
1 2/20/07
62.2
KC3.1
1 2/20/07
62.2
F-349

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/20/07
62.8
KC3.1
1 2/20/07
62.5
KC3.1
1 2/20/07
62.1
KC3.1
1 2/20/07
62.1
KC3.1
1 2/20/07
58
KC3.1
1 2/20/07
56.9
KC3.1
1 2/20/07
56.5
KC3.1
1 2/20/07
53.9
KC3.1
1 2/20/07
58.2
KC3.1
1 2/20/07
58.5
KC3.1
1 2/20/07
59.1
KC3.1
1 2/20/07
54.6
KC3.1
1 2/20/07
53.2
KC3.1
1 2/20/07
52.9
KC3.1
1 2/20/07
54.8
KC3.1
1 2/20/07
59.1
KC3.1
1 2/20/07
60.2
KC3.1
1 2/20/07
60
KC3.1
1 2/20/07
61.6
KC3.1
1 2/20/07
59.8
KC3.1
1 2/20/07
59.7
KC3.1
1 2/20/07
59.5
KC3.1
1 2/20/07
60.8
KC3.1
1 2/20/07
59.3
KC3.1
1 2/20/07
61.4
KC3.1
1 2/20/07
64.2
KC3.1
1 2/20/07
66.3
KC3.1
1 2/20/07
48.1
KC3.1
1 2/20/07
49.9
KC3.1
1 2/20/07
155
KC3.1
1 2/20/07
61.2
KC3.1
1 2/20/07
62.6
KC3.1
1 2/20/07
64.2
KC3.1
1 2/20/07
65.1
KC3.1
1 2/20/07
65.8
KC3.1
12/22/07
320
KC3.1
12/22/07
41.8
KC3.1
12/22/07
46.1
KC3.1
12/22/07
46.8
KC3.1
12/22/07
45.2
KC3.1
12/22/07
44
KC3.1
12/22/07
43.3
KC3.1
12/22/07
44.7
KC3.1
12/22/07
46.2
KC3.1
12/22/07
46.5
F-350

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
12/22/07
43.7
KC3.1
12/22/07
42.2
KC3.1
12/22/07
46.8
KC3.1
12/22/07
48.7
KC3.1
12/22/07
49.7
KC3.1
12/22/07
51.5
KC3.1
12/22/07
51.6
KC3.1
12/22/07
49.7
KC3.1
12/22/07
47.6
KC3.1
12/22/07
46.7
KC3.1
12/22/07
49.7
KC3.1
12/22/07
51.5
KC3.1
12/22/07
52.7
KC3.1
12/22/07
55.8
KC3.1
12/22/07
55
KC3.1
12/22/07
52.2
KC3.1
12/22/07
51.6
KC3.1
12/22/07
50.1
KC3.1
12/22/07
46.8
KC3.1
12/22/07
45.8
KC3.1
12/22/07
39.6
KC3.1
12/22/07
35.9
KC3.1
12/22/07
77
KC3.1
12/23/07
34.9
KC3.1
12/23/07
36.8
KC3.1
12/23/07
38.4
KC3.1
12/23/07
39.9
KC3.1
12/23/07
41.9
KC3.1
12/23/07
41.8
KC3.1
12/23/07
40.2
KC3.1
12/23/07
38
KC3.1
12/23/07
36.5
KC3.1
12/23/07
36
KC3.1
12/23/07
37.6
KC3.1
12/23/07
36
KC3.1
12/23/07
33.9
KC3.1
12/23/07
34.2
KC3.1
12/23/07
35.9
KC3.1
12/23/07
36.3
KC3.1
12/23/07
34.7
KC3.1
12/23/07
34.3
KC3.1
12/23/07
36.8
KC3.1
12/23/07
37.8
KC3.1
12/23/07
39.1
KC3.1
12/23/07
39.1
F-351

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
12/23/07
36.4
KC3.1
12/23/07
36.5
KC3.1
12/23/07
37.1
KC3.1
12/23/07
37.5
KC3.1
12/23/07
34.4
KC3.1
12/23/07
31.2
KC3.1
12/23/07
30.2
KC3.1
12/23/07
30.5
KC3.1
12/23/07
32.2
KC3.1
12/23/07
32.1
KC3.1
12/23/07
29.9
KC3.1
12/23/07
28.1
KC3.1
12/23/07
29
KC3.1
12/23/07
30
KC3.1
12/23/07
36.9
KC3.1
12/23/07
40.4
KC3.1
12/23/07
29.6
KC3.1
12/23/07
27.8
KC3.1
12/23/07
42.1
KC3.1
1 2/28/07
17.7
KC3.1
1 2/28/07
19.7
KC3.1
1 2/28/07
18
KC3.1
1 2/28/07
16.9
KC3.1
1 2/28/07
16.3
KC3.1
1 2/28/07
16.3
KC3.1
1 2/28/07
16.4
KC3.1
1 2/28/07
28.2
KC3.1
1 2/28/07
15.3
KC3.1
1 2/28/07
15.4
KC3.1
1 2/28/07
14.8
KC3.1
1 2/28/07
15.6
KC3.1
1 2/28/07
18.9
KC3.1
1 2/28/07
24.1
KC3.1
1 2/28/07
108
KC3.1
1 2/30/07
21.7
KC3.1
1 2/30/07
16.4
KC3.1
1 2/30/07
15.2
KC3.1
1 2/30/07
15.6
KC3.1
1 2/30/07
16.7
KC3.1
1 2/30/07
17.9
KC3.1
1 2/30/07
19
KC3.1
1 2/30/07
19.1
KC3.1
1 2/30/07
19.4
KC3.1
1 2/30/07
19.2
KC3.1
1 2/30/07
19
F-352

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.1
1 2/30/07
20.4
KC3.1
1 2/30/07
21.9
KC3.1
1 2/30/07
21
KC3.1
1 2/30/07
13.9
KC3.1
1 2/30/07
12.1
KC3.1
1 2/30/07
22.6
KC3.2
1 2/02/07
71.1
KC3.2
1 2/02/07
71.4
KC3.2
1 2/02/07
71.1
KC3.2
1 2/02/07
71.8
KC3.2
1 2/02/07
71.9
KC3.2
1 2/02/07
71.4
KC3.2
1 2/02/07
71.6
KC3.2
1 2/02/07
71.7
KC3.2
1 2/02/07
71.6
KC3.2
1 2/02/07
71.3
KC3.2
1 2/02/07
71.2
KC3.2
1 2/02/07
71.6
KC3.2
1 2/02/07
70.9
KC3.2
1 2/02/07
69.2
KC3.2
1 2/02/07
69.7
KC3.2
1 2/02/07
70.3
KC3.2
1 2/02/07
70.8
KC3.2
1 2/02/07
71.2
KC3.2
1 2/02/07
71.5
KC3.2
1 2/02/07
72.1
KC3.2
1 2/02/07
73
KC3.2
1 2/02/07
72.6
KC3.2
1 2/02/07
72.1
KC3.2
1 2/02/07
71.8
KC3.2
1 2/02/07
71.8
KC3.2
1 2/02/07
71.2
KC3.2
1 2/02/07
70.7
KC3.2
1 2/02/07
70.3
KC3.2
1 2/02/07
69.5
KC3.2
1 2/02/07
69.2
KC3.2
1 2/02/07
67.6
KC3.2
1 2/02/07
70.2
KC3.2
1 2/02/07
65.7
KC3.2
1 2/02/07
63.5
KC3.2
1 2/02/07
62.7
KC3.2
1 2/02/07
62.3
KC3.2
1 2/02/07
61.7
KC3.2
1 2/02/07
60.3
KC3.2
1 2/02/07
59.3
F-353

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/02/07
57.8
KC3.2
1 2/02/07
57
KC3.2
1 2/02/07
55.7
KC3.2
1 2/02/07
54.9
KC3.2
1 2/02/07
53.7
KC3.2
1 2/02/07
51.9
KC3.2
1 2/02/07
50.4
KC3.2
1 2/02/07
49.1
KC3.2
1 2/02/07
48
KC3.2
1 2/02/07
49.7
KC3.2
1 2/02/07
51
KC3.2
1 2/02/07
51.9
KC3.2
1 2/02/07
52.6
KC3.2
1 2/02/07
52.8
KC3.2
1 2/02/07
51.9
KC3.2
1 2/02/07
50.3
KC3.2
1 2/02/07
51.8
KC3.2
1 2/02/07
52.8
KC3.2
1 2/02/07
52.2
KC3.2
1 2/02/07
52.2
KC3.2
1 2/02/07
52.1
KC3.2
1 2/02/07
51.4
KC3.2
1 2/02/07
52.1
KC3.2
1 2/02/07
53.7
KC3.2
1 2/02/07
54.1
KC3.2
1 2/02/07
51.9
KC3.2
1 2/02/07
52.6
KC3.2
1 2/02/07
53.9
KC3.2
1 2/02/07
54.8
KC3.2
1 2/02/07
56.2
KC3.2
1 2/02/07
56.2
KC3.2
1 2/02/07
57.6
KC3.2
1 2/02/07
59.6
KC3.2
1 2/02/07
60.2
KC3.2
1 2/02/07
60
KC3.2
1 2/02/07
55.1
KC3.2
1 2/02/07
54.8
KC3.2
1 2/02/07
55.5
KC3.2
1 2/02/07
55.5
KC3.2
1 2/02/07
55.6
KC3.2
1 2/02/07
54.1
KC3.2
1 2/02/07
50.3
KC3.2
1 2/02/07
45.6
KC3.2
1 2/02/07
41.2
KC3.2
1 2/02/07
38.7
F-354

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/02/07
36.1
KC3.2
1 2/02/07
34.6
KC3.2
1 2/02/07
34.2
KC3.2
1 2/02/07
36
KC3.2
1 2/02/07
89.4
KC3.2
1 2/02/07
234
KC3.2
1 2/03/07
82.4
KC3.2
1 2/03/07
77.4
KC3.2
1 2/03/07
82.1
KC3.2
1 2/03/07
78.5
KC3.2
1 2/03/07
83.4
KC3.2
1 2/03/07
78.3
KC3.2
1 2/03/07
83.1
KC3.2
1 2/03/07
79.3
KC3.2
1 2/03/07
84
KC3.2
1 2/03/07
83.2
KC3.2
1 2/03/07
84.4
KC3.2
1 2/03/07
83.4
KC3.2
1 2/03/07
83.3
KC3.2
1 2/03/07
82.5
KC3.2
1 2/03/07
77.7
KC3.2
1 2/03/07
79.7
KC3.2
1 2/03/07
75.5
KC3.2
1 2/03/07
78.6
KC3.2
1 2/03/07
73.8
KC3.2
1 2/03/07
77.7
KC3.2
1 2/03/07
73.9
KC3.2
1 2/03/07
77
KC3.2
1 2/03/07
76.3
KC3.2
1 2/03/07
77.3
KC3.2
1 2/03/07
81.6
KC3.2
1 2/03/07
77.7
KC3.2
1 2/03/07
79.9
KC3.2
1 2/03/07
80.3
KC3.2
1 2/03/07
80.7
KC3.2
1 2/03/07
79.9
KC3.2
1 2/03/07
82.1
KC3.2
1 2/03/07
82.1
KC3.2
1 2/03/07
83.6
KC3.2
1 2/03/07
155.6
KC3.2
1 2/03/07
84.3
KC3.2
1 2/03/07
83.7
KC3.2
1 2/03/07
81.8
KC3.2
1 2/03/07
81.6
KC3.2
1 2/03/07
81.4
F-355

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/03/07
79.5
KC3.2
1 2/03/07
80.5
KC3.2
1 2/03/07
80
KC3.2
1 2/03/07
80.3
KC3.2
1 2/03/07
77.3
KC3.2
1 2/03/07
78.3
KC3.2
1 2/03/07
80.4
KC3.2
1 2/03/07
81.7
KC3.2
1 2/03/07
83.1
KC3.2
1 2/03/07
82.9
KC3.2
1 2/03/07
84.3
KC3.2
1 2/03/07
83.2
KC3.2
1 2/03/07
77.2
KC3.2
1 2/03/07
76
KC3.2
1 2/03/07
78
KC3.2
1 2/03/07
78.7
KC3.2
1 2/03/07
79.8
KC3.2
1 2/03/07
80
KC3.2
1 2/03/07
75.7
KC3.2
1 2/03/07
76.4
KC3.2
1 2/03/07
79.2
KC3.2
1 2/03/07
79.9
KC3.2
1 2/03/07
81.1
KC3.2
1 2/03/07
80.7
KC3.2
1 2/03/07
81.2
KC3.2
1 2/03/07
81.5
KC3.2
1 2/03/07
81
KC3.2
1 2/03/07
82
KC3.2
1 2/03/07
82.3
KC3.2
1 2/03/07
83.5
KC3.2
1 2/03/07
82.6
KC3.2
1 2/03/07
82.5
KC3.2
1 2/03/07
78
KC3.2
1 2/03/07
76.3
KC3.2
1 2/03/07
78
KC3.2
1 2/03/07
80.6
KC3.2
1 2/03/07
79.5
KC3.2
1 2/03/07
79.4
KC3.2
1 2/03/07
78.4
KC3.2
1 2/03/07
78
KC3.2
1 2/03/07
75
KC3.2
1 2/03/07
70.1
KC3.2
1 2/03/07
69.4
KC3.2
1 2/03/07
70
KC3.2
1 2/03/07
72.9
F-356

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/03/07
71.6
KC3.2
1 2/03/07
70.8
KC3.2
1 2/03/07
72
KC3.2
1 2/03/07
70
KC3.2
1 2/03/07
71.1
KC3.2
1 2/03/07
77
KC3.2
1 2/03/07
79.2
KC3.2
1 2/03/07
66.1
KC3.2
1 2/03/07
64.3
KC3.2
1 2/03/07
67.6
KC3.2
1 2/03/07
129
KC3.2
1 2/03/07
71.5
KC3.2
1 2/04/07
68.6
KC3.2
1 2/04/07
64.8
KC3.2
1 2/04/07
65.4
KC3.2
1 2/04/07
68.6
KC3.2
1 2/04/07
64.2
KC3.2
1 2/04/07
69
KC3.2
1 2/04/07
66.1
KC3.2
1 2/04/07
69.2
KC3.2
1 2/04/07
66.2
KC3.2
1 2/04/07
69.6
KC3.2
1 2/04/07
65.6
KC3.2
1 2/04/07
63.7
KC3.2
1 2/04/07
67.7
KC3.2
1 2/04/07
64.1
KC3.2
1 2/04/07
69.8
KC3.2
1 2/04/07
66.1
KC3.2
1 2/04/07
68.4
KC3.2
1 2/04/07
66.3
KC3.2
1 2/04/07
70.4
KC3.2
1 2/04/07
67.3
KC3.2
1 2/04/07
70.2
KC3.2
1 2/04/07
72.2
KC3.2
1 2/04/07
68.7
KC3.2
1 2/04/07
67.8
KC3.2
1 2/04/07
67.4
KC3.2
1 2/04/07
66.5
KC3.2
1 2/04/07
69.1
KC3.2
1 2/04/07
66.2
KC3.2
1 2/04/07
69.6
KC3.2
1 2/04/07
69
KC3.2
1 2/04/07
68.7
KC3.2
1 2/04/07
69.1
KC3.2
1 2/04/07
83.9
F-357

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/04/07
69
KC3.2
1 2/04/07
68.4
KC3.2
1 2/04/07
69.3
KC3.2
1 2/04/07
71
KC3.2
1 2/04/07
68.1
KC3.2
1 2/04/07
68.3
KC3.2
1 2/04/07
72.9
KC3.2
1 2/04/07
128.4
KC3.2
1 2/04/07
69.4
KC3.2
1 2/04/07
69.9
KC3.2
1 2/04/07
66.7
KC3.2
1 2/04/07
68.1
KC3.2
1 2/04/07
70.7
KC3.2
1 2/04/07
68.1
KC3.2
1 2/04/07
71.3
KC3.2
1 2/04/07
69.3
KC3.2
1 2/04/07
70.3
KC3.2
1 2/04/07
66.8
KC3.2
1 2/04/07
69.1
KC3.2
1 2/04/07
66.9
KC3.2
1 2/04/07
68.9
KC3.2
1 2/04/07
73.6
KC3.2
1 2/04/07
81.3
KC3.2
1 2/04/07
68.4
KC3.2
1 2/04/07
69.2
KC3.2
1 2/04/07
173
KC3.2
1 2/04/07
69.7
KC3.2
1 2/04/07
68.5
KC3.2
1 2/04/07
67.8
KC3.2
1 2/04/07
80.6
KC3.2
1 2/04/07
68.3
KC3.2
1 2/04/07
70
KC3.2
1 2/04/07
70.5
KC3.2
1 2/04/07
74.7
KC3.2
1 2/04/07
71.2
KC3.2
1 2/04/07
71.9
KC3.2
1 2/04/07
68.6
KC3.2
1 2/04/07
67.5
KC3.2
1 2/04/07
67.5
KC3.2
1 2/04/07
61.9
KC3.2
1 2/04/07
63.6
KC3.2
1 2/04/07
68.5
KC3.2
1 2/04/07
66.6
KC3.2
1 2/04/07
73.1
KC3.2
1 2/04/07
70.6
F-358

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/04/07
66.9
KC3.2
1 2/04/07
65.9
KC3.2
1 2/04/07
68.3
KC3.2
1 2/04/07
72.1
KC3.2
1 2/04/07
71.8
KC3.2
1 2/04/07
76.8
KC3.2
1 2/04/07
75.2
KC3.2
1 2/04/07
73.3
KC3.2
1 2/04/07
71.7
KC3.2
1 2/04/07
106.4
KC3.2
1 2/04/07
106.2
KC3.2
1 2/04/07
79.2
KC3.2
1 2/05/07
68.5
KC3.2
1 2/05/07
66.7
KC3.2
1 2/05/07
65.5
KC3.2
1 2/05/07
65.2
KC3.2
1 2/05/07
77.8
KC3.2
1 2/05/07
69
KC3.2
1 2/05/07
65.3
KC3.2
1 2/05/07
67
KC3.2
1 2/05/07
59.7
KC3.2
1 2/05/07
60.8
KC3.2
1 2/05/07
81.2
KC3.2
1 2/05/07
70.7
KC3.2
1 2/05/07
64.4
KC3.2
12/11/07
28.1
KC3.2
12/11/07
27.6
KC3.2
12/11/07
28.4
KC3.2
12/11/07
28.5
KC3.2
12/11/07
29.6
KC3.2
12/11/07
30
KC3.2
12/11/07
30
KC3.2
12/11/07
34.1
KC3.2
12/11/07
30.8
KC3.2
12/11/07
8.7
KC3.2
1 2/15/07
33
KC3.2
1 2/15/07
30.8
KC3.2
1 2/15/07
29.1
KC3.2
1 2/15/07
29.8
KC3.2
1 2/15/07
31.8
KC3.2
1 2/15/07
33
KC3.2
1 2/15/07
34.7
KC3.2
1 2/15/07
35.9
KC3.2
1 2/15/07
34.3
KC3.2
1 2/15/07
33.2
F-359

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/15/07
34.3
KC3.2
1 2/15/07
34.2
KC3.2
1 2/15/07
31.2
KC3.2
1 2/15/07
27.5
KC3.2
1 2/15/07
25.1
KC3.2
1 2/15/07
25.1
KC3.2
1 2/15/07
24.8
KC3.2
1 2/15/07
24.6
KC3.2
1 2/15/07
25.7
KC3.2
1 2/15/07
26.8
KC3.2
1 2/15/07
25.3
KC3.2
1 2/15/07
23.5
KC3.2
1 2/15/07
19.8
KC3.2
1 2/15/07
19
KC3.2
1 2/15/07
19.2
KC3.2
1 2/15/07
19.5
KC3.2
1 2/15/07
19.9
KC3.2
1 2/15/07
18.3
KC3.2
1 2/15/07
16.7
KC3.2
1 2/15/07
16
KC3.2
1 2/15/07
16.3
KC3.2
1 2/15/07
12.3
KC3.2
1 2/15/07
15.3
KC3.2
1 2/18/07
37.2
KC3.2
1 2/18/07
37.4
KC3.2
1 2/18/07
37
KC3.2
1 2/18/07
38.9
KC3.2
1 2/18/07
38.6
KC3.2
1 2/18/07
39.1
KC3.2
1 2/18/07
40.3
KC3.2
1 2/18/07
40.8
KC3.2
1 2/18/07
41.8
KC3.2
1 2/18/07
42
KC3.2
1 2/18/07
44.7
KC3.2
1 2/18/07
44.6
KC3.2
1 2/18/07
43.3
KC3.2
1 2/18/07
42.6
KC3.2
1 2/18/07
45.5
KC3.2
1 2/18/07
45.9
KC3.2
1 2/18/07
29.7
KC3.2
1 2/18/07
9.1
KC3.2
1 2/18/07
9
KC3.2
1 2/19/07
63.6
KC3.2
1 2/19/07
64
KC3.2
1 2/19/07
66.2
F-360

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/19/07
66.7
KC3.2
1 2/19/07
67.6
KC3.2
1 2/19/07
70.8
KC3.2
1 2/19/07
70.2
KC3.2
1 2/19/07
70.2
KC3.2
1 2/19/07
68.1
KC3.2
1 2/19/07
67.8
KC3.2
1 2/19/07
69.2
KC3.2
1 2/19/07
71.1
KC3.2
1 2/19/07
71.4
KC3.2
1 2/19/07
69.4
KC3.2
1 2/19/07
71.2
KC3.2
1 2/19/07
65.2
KC3.2
1 2/19/07
64.2
KC3.2
1 2/19/07
60.5
KC3.2
1 2/19/07
60.1
KC3.2
1 2/19/07
49.6
KC3.2
1 2/19/07
46.8
KC3.2
1 2/19/07
42.3
KC3.2
1 2/19/07
36.7
KC3.2
1 2/19/07
38.6
KC3.2
1 2/19/07
44.5
KC3.2
1 2/19/07
44.9
KC3.2
1 2/19/07
44.8
KC3.2
1 2/19/07
45.3
KC3.2
1 2/19/07
46.4
KC3.2
1 2/19/07
45.1
KC3.2
1 2/19/07
42.9
KC3.2
1 2/19/07
40.6
KC3.2
1 2/19/07
40.8
KC3.2
1 2/19/07
39.3
KC3.2
1 2/19/07
37.6
KC3.2
1 2/19/07
37.4
KC3.2
1 2/19/07
36.7
KC3.2
1 2/19/07
34.8
KC3.2
1 2/19/07
33.5
KC3.2
1 2/19/07
35.5
KC3.2
1 2/19/07
35.1
KC3.2
1 2/19/07
33.7
KC3.2
1 2/19/07
32.6
KC3.2
1 2/19/07
30.6
KC3.2
1 2/19/07
28.8
KC3.2
1 2/19/07
28.5
KC3.2
1 2/19/07
29.9
KC3.2
1 2/19/07
30.9
F-361

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/19/07
36.2
KC3.2
1 2/19/07
36.1
KC3.2
1 2/19/07
36.3
KC3.2
1 2/19/07
37.1
KC3.2
1 2/19/07
36.9
KC3.2
1 2/19/07
37.2
KC3.2
1 2/19/07
38.5
KC3.2
1 2/19/07
39.3
KC3.2
1 2/19/07
40.9
KC3.2
1 2/19/07
42.2
KC3.2
1 2/19/07
42.5
KC3.2
1 2/19/07
44.3
KC3.2
1 2/19/07
42.6
KC3.2
1 2/19/07
42.2
KC3.2
1 2/19/07
40.5
KC3.2
1 2/19/07
40.1
KC3.2
1 2/19/07
40.1
KC3.2
1 2/19/07
41
KC3.2
1 2/19/07
39.3
KC3.2
1 2/19/07
70.3
KC3.2
1 2/19/07
37.3
KC3.2
1 2/20/07
64.6
KC3.2
1 2/20/07
60
KC3.2
1 2/20/07
58.2
KC3.2
1 2/20/07
61.6
KC3.2
1 2/20/07
58.8
KC3.2
1 2/20/07
58.8
KC3.2
1 2/20/07
60.4
KC3.2
1 2/20/07
58
KC3.2
1 2/20/07
61.7
KC3.2
1 2/20/07
59.5
KC3.2
1 2/20/07
62.5
KC3.2
1 2/20/07
60.4
KC3.2
1 2/20/07
63.1
KC3.2
1 2/20/07
60.6
KC3.2
1 2/20/07
61
KC3.2
1 2/20/07
63.8
KC3.2
1 2/20/07
60.6
KC3.2
1 2/20/07
62.3
KC3.2
1 2/20/07
61.9
KC3.2
1 2/20/07
58.3
KC3.2
1 2/20/07
56.2
KC3.2
1 2/20/07
57.4
KC3.2
1 2/20/07
53.3
KC3.2
1 2/20/07
57.8
F-362

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/20/07
58.5
KC3.2
1 2/20/07
59.1
KC3.2
1 2/20/07
56.8
KC3.2
1 2/20/07
53
KC3.2
1 2/20/07
52.9
KC3.2
1 2/20/07
53.7
KC3.2
1 2/20/07
66.7
KC3.2
1 2/20/07
486.6
KC3.2
1 2/20/07
60
KC3.2
1 2/20/07
62.8
KC3.2
1 2/20/07
60.5
KC3.2
1 2/20/07
61.4
KC3.2
1 2/20/07
59.8
KC3.2
1 2/20/07
61.8
KC3.2
1 2/20/07
59.9
KC3.2
1 2/20/07
63.6
KC3.2
1 2/20/07
64.3
KC3.2
1 2/20/07
62.7
KC3.2
1 2/20/07
49.3
KC3.2
1 2/20/07
49.3
KC3.2
1 2/20/07
74.8
KC3.2
1 2/20/07
289.5
KC3.2
1 2/20/07
60.5
KC3.2
12/22/07
39.6
KC3.2
12/22/07
42.5
KC3.2
12/22/07
44.8
KC3.2
12/22/07
47.2
KC3.2
12/22/07
46.3
KC3.2
12/22/07
42.3
KC3.2
12/22/07
43.4
KC3.2
12/22/07
44
KC3.2
12/22/07
45.6
KC3.2
12/22/07
46.4
KC3.2
12/22/07
43.5
KC3.2
12/22/07
41.8
KC3.2
12/22/07
46.6
KC3.2
12/22/07
48.4
KC3.2
12/22/07
50.3
KC3.2
12/22/07
50.8
KC3.2
12/22/07
51.9
KC3.2
12/22/07
50.3
KC3.2
12/22/07
48.3
KC3.2
12/22/07
46.4
KC3.2
12/22/07
48.8
KC3.2
12/22/07
53.9
F-363

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
12/22/07
52.9
KC3.2
12/22/07
55.3
KC3.2
12/22/07
55.5
KC3.2
12/22/07
52.5
KC3.2
12/22/07
51.1
KC3.2
12/22/07
50.2
KC3.2
12/22/07
47.1
KC3.2
12/22/07
44.2
KC3.2
12/22/07
39.6
KC3.2
12/22/07
56.7
KC3.2
12/23/07
244.2
KC3.2
12/23/07
32.6
KC3.2
12/23/07
32.4
KC3.2
12/23/07
35.1
KC3.2
12/23/07
37.7
KC3.2
12/23/07
38.9
KC3.2
12/23/07
40.1
KC3.2
12/23/07
38.4
KC3.2
12/23/07
35.2
KC3.2
12/23/07
34.1
KC3.2
12/23/07
32.7
KC3.2
12/23/07
34.1
KC3.2
12/23/07
33.6
KC3.2
12/23/07
30.6
KC3.2
12/23/07
30.3
KC3.2
12/23/07
32.1
KC3.2
12/23/07
33.1
KC3.2
12/23/07
31.9
KC3.2
12/23/07
30.5
KC3.2
12/23/07
33.2
KC3.2
12/23/07
35.1
KC3.2
12/23/07
36
KC3.2
12/23/07
36.4
KC3.2
12/23/07
34
KC3.2
12/23/07
34
KC3.2
12/23/07
34.4
KC3.2
12/23/07
34.5
KC3.2
12/23/07
32.4
KC3.2
12/23/07
29.5
KC3.2
12/23/07
28
KC3.2
12/23/07
27.8
KC3.2
12/23/07
28.9
KC3.2
12/23/07
29.6
KC3.2
12/23/07
27.8
KC3.2
12/23/07
25.8
F-364

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
12/23/07
26.1
KC3.2
12/23/07
27.5
KC3.2
12/23/07
30.8
KC3.2
12/23/07
37.4
KC3.2
12/23/07
28.6
KC3.2
12/23/07
25.6
KC3.2
12/23/07
25.3
KC3.2
12/23/07
28.8
KC3.2
12/23/07
26.2
KC3.2
12/27/07
22.2
KC3.2
12/27/07
21.7
KC3.2
12/27/07
21.4
KC3.2
12/27/07
21.6
KC3.2
12/27/07
21.4
KC3.2
12/27/07
19.7
KC3.2
12/27/07
19.3
KC3.2
12/27/07
19.6
KC3.2
12/27/07
20.6
KC3.2
12/27/07
20.3
KC3.2
12/27/07
18.1
KC3.2
12/27/07
17.5
KC3.2
12/27/07
17.6
KC3.2
12/27/07
17.1
KC3.2
12/27/07
17.4
KC3.2
12/27/07
18.9
KC3.2
12/27/07
18.8
KC3.2
12/27/07
18.5
KC3.2
12/27/07
17.7
KC3.2
12/27/07
17
KC3.2
12/27/07
16.3
KC3.2
12/27/07
15.5
KC3.2
12/27/07
14.7
KC3.2
12/27/07
13.9
KC3.2
12/27/07
12.7
KC3.2
12/27/07
12
KC3.2
12/27/07
12.2
KC3.2
12/27/07
13.3
KC3.2
12/27/07
11.9
KC3.2
12/27/07
11.7
KC3.2
12/27/07
38.1
KC3.2
1 2/28/07
409.8
KC3.2
1 2/28/07
18
KC3.2
1 2/28/07
19.9
KC3.2
1 2/28/07
17.7
KC3.2
1 2/28/07
17.1
F-365

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.2
1 2/28/07
16.8
KC3.2
1 2/28/07
16.5
KC3.2
1 2/28/07
16.8
KC3.2
1 2/28/07
16.5
KC3.2
1 2/28/07
16.1
KC3.2
1 2/28/07
16.1
KC3.2
1 2/28/07
15.1
KC3.2
1 2/28/07
16.3
KC3.2
1 2/28/07
19.4
KC3.2
1 2/28/07
16
KC3.2
1 2/28/07
84.8
KC3.2
1 2/28/07
17.1
KC3.2
1 2/28/07
18.9
KC3.2
1 2/28/07
19.7
KC3.2
1 2/28/07
21.4
KC3.2
1 2/28/07
20.5
KC3.2
1 2/28/07
19.7
KC3.2
1 2/28/07
20.2
KC3.2
1 2/28/07
20.8
KC3.2
1 2/28/07
20
KC3.2
1 2/28/07
19.8
KC3.2
1 2/28/07
20.1
KC3.2
1 2/28/07
19.7
KC3.2
1 2/28/07
19.9
KC3.2
1 2/28/07
19.2
KC3.2
1 2/28/07
19.7
KC3.2
1 2/28/07
20
KC3.2
1 2/28/07
19.5
KC3.2
1 2/28/07
19.6
KC3.2
1 2/28/07
20.2
KC3.2
1 2/28/07
21.4
KC3.2
1 2/28/07
21.4
KC3.2
1 2/28/07
21.3
KC3.2
1 2/28/07
19.3
KC3.2
1 2/28/07
18.7
KC3.2
1 2/28/07
18.7
KC3.2
1 2/28/07
19.5
KC3.2
1 2/28/07
20
KC3.2
1 2/28/07
36
KC3.2
1 2/28/07
86.8
KC3.2
1 2/28/07
21.6
KC3.3
12/01/07
30.2
KC3.3
12/01/07
26.6
KC3.3
12/01/07
26.4
KC3.3
12/01/07
32.6
F-366

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/02/07
69.8
KC3.3
1 2/02/07
69.9
KC3.3
1 2/02/07
70.8
KC3.3
1 2/02/07
70.5
KC3.3
1 2/02/07
70
KC3.3
1 2/02/07
70
KC3.3
1 2/02/07
70.1
KC3.3
1 2/02/07
70.5
KC3.3
1 2/02/07
70.4
KC3.3
1 2/02/07
69.7
KC3.3
1 2/02/07
70
KC3.3
1 2/02/07
69.9
KC3.3
1 2/02/07
69
KC3.3
1 2/02/07
68.5
KC3.3
1 2/02/07
69
KC3.3
1 2/02/07
69.7
KC3.3
1 2/02/07
70
KC3.3
1 2/02/07
70.4
KC3.3
1 2/02/07
70.5
KC3.3
1 2/02/07
71.7
KC3.3
1 2/02/07
72.2
KC3.3
1 2/02/07
72.3
KC3.3
1 2/02/07
73.2
KC3.3
1 2/02/07
72.6
KC3.3
1 2/02/07
72.1
KC3.3
1 2/02/07
71.7
KC3.3
1 2/02/07
71.7
KC3.3
1 2/02/07
73.9
KC3.3
1 2/02/07
70.2
KC3.3
1 2/02/07
68.9
KC3.3
1 2/02/07
80.1
KC3.3
1 2/02/07
65.7
KC3.3
1 2/02/07
66.3
KC3.3
1 2/02/07
64.1
KC3.3
1 2/02/07
62.5
KC3.3
1 2/02/07
62
KC3.3
1 2/02/07
61
KC3.3
1 2/02/07
60.1
KC3.3
1 2/02/07
58.4
KC3.3
1 2/02/07
57.7
KC3.3
1 2/02/07
56.1
KC3.3
1 2/02/07
55.9
KC3.3
1 2/02/07
54.3
KC3.3
1 2/02/07
52.7
KC3.3
1 2/02/07
51.2
F-367

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/02/07
49.4
KC3.3
1 2/02/07
48.1
KC3.3
1 2/02/07
46.8
KC3.3
1 2/02/07
46.8
KC3.3
1 2/02/07
51
KC3.3
1 2/02/07
51.5
KC3.3
1 2/02/07
52.3
KC3.3
1 2/02/07
54.3
KC3.3
1 2/02/07
53.7
KC3.3
1 2/02/07
49.6
KC3.3
1 2/02/07
49.9
KC3.3
1 2/02/07
51.2
KC3.3
1 2/02/07
52.7
KC3.3
1 2/02/07
50.4
KC3.3
1 2/02/07
50.7
KC3.3
1 2/02/07
51.1
KC3.3
1 2/02/07
50.6
KC3.3
1 2/02/07
52.9
KC3.3
1 2/02/07
54.4
KC3.3
1 2/02/07
52.2
KC3.3
1 2/02/07
52
KC3.3
1 2/02/07
53.2
KC3.3
1 2/02/07
53.6
KC3.3
1 2/02/07
55.2
KC3.3
1 2/02/07
55.9
KC3.3
1 2/02/07
56
KC3.3
1 2/02/07
58.7
KC3.3
1 2/02/07
60.1
KC3.3
1 2/02/07
60
KC3.3
1 2/02/07
56.9
KC3.3
1 2/02/07
54.9
KC3.3
1 2/02/07
54.8
KC3.3
1 2/02/07
54.8
KC3.3
1 2/02/07
55.2
KC3.3
1 2/02/07
54.2
KC3.3
1 2/02/07
52.1
KC3.3
1 2/02/07
47.9
KC3.3
1 2/02/07
43.4
KC3.3
1 2/02/07
40
KC3.3
1 2/02/07
37
KC3.3
1 2/02/07
35.1
KC3.3
1 2/02/07
34.8
KC3.3
1 2/02/07
34.8
KC3.3
1 2/02/07
38.5
KC3.3
1 2/02/07
39.7
F-368

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/02/07
41.8
KC3.3
1 2/02/07
41.4
KC3.3
1 2/02/07
40.2
KC3.3
1 2/02/07
33.4
KC3.3
1 2/03/07
83.8
KC3.3
1 2/03/07
87
KC3.3
1 2/03/07
83.4
KC3.3
1 2/03/07
84
KC3.3
1 2/03/07
85.4
KC3.3
1 2/03/07
84.8
KC3.3
1 2/03/07
89.1
KC3.3
1 2/03/07
85.4
KC3.3
1 2/03/07
84.5
KC3.3
1 2/03/07
85.8
KC3.3
1 2/03/07
88.6
KC3.3
1 2/03/07
88.6
KC3.3
1 2/03/07
86.1
KC3.3
1 2/03/07
86.4
KC3.3
1 2/03/07
83.8
KC3.3
1 2/03/07
80.1
KC3.3
1 2/03/07
82.1
KC3.3
1 2/03/07
78.1
KC3.3
1 2/03/07
77.1
KC3.3
1 2/03/07
77.5
KC3.3
1 2/03/07
76.2
KC3.3
1 2/03/07
78.5
KC3.3
1 2/03/07
77
KC3.3
1 2/03/07
77.7
KC3.3
1 2/03/07
80.4
KC3.3
1 2/03/07
82.3
KC3.3
1 2/03/07
78.3
KC3.3
1 2/03/07
84.6
KC3.3
1 2/03/07
82
KC3.3
1 2/03/07
82.1
KC3.3
1 2/03/07
83.6
KC3.3
1 2/03/07
81.2
KC3.3
1 2/03/07
82.5
KC3.3
1 2/03/07
82.3
KC3.3
1 2/03/07
80.7
KC3.3
1 2/03/07
81.8
KC3.3
1 2/03/07
79.1
KC3.3
1 2/03/07
77
KC3.3
1 2/03/07
75.6
KC3.3
1 2/03/07
75
KC3.3
1 2/03/07
74.6
F-369

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/03/07
74.4
KC3.3
1 2/03/07
75.7
KC3.3
1 2/03/07
73.3
KC3.3
1 2/03/07
72
KC3.3
1 2/03/07
74.9
KC3.3
1 2/03/07
76
KC3.3
1 2/03/07
77.6
KC3.3
1 2/03/07
78.9
KC3.3
1 2/03/07
79.3
KC3.3
1 2/03/07
82.2
KC3.3
1 2/03/07
75.2
KC3.3
1 2/03/07
71.2
KC3.3
1 2/03/07
79.1
KC3.3
1 2/03/07
71.6
KC3.3
1 2/03/07
74.1
KC3.3
1 2/03/07
77.8
KC3.3
1 2/03/07
73.4
KC3.3
1 2/03/07
73.8
KC3.3
1 2/03/07
74.8
KC3.3
1 2/03/07
77
KC3.3
1 2/03/07
77.3
KC3.3
1 2/03/07
81.1
KC3.3
1 2/03/07
75.5
KC3.3
1 2/03/07
76.2
KC3.3
1 2/03/07
76.9
KC3.3
1 2/03/07
76.8
KC3.3
1 2/03/07
77
KC3.3
1 2/03/07
78.2
KC3.3
1 2/03/07
78.7
KC3.3
1 2/03/07
79.7
KC3.3
1 2/03/07
76.8
KC3.3
1 2/03/07
73.7
KC3.3
1 2/03/07
74.7
KC3.3
1 2/03/07
76.1
KC3.3
1 2/03/07
76.7
KC3.3
1 2/03/07
76.8
KC3.3
1 2/03/07
75.9
KC3.3
1 2/03/07
75.2
KC3.3
1 2/03/07
75
KC3.3
1 2/03/07
69.9
KC3.3
1 2/03/07
68.3
KC3.3
1 2/03/07
68.4
KC3.3
1 2/03/07
70.3
KC3.3
1 2/03/07
69.9
KC3.3
1 2/03/07
68.9
F-370

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/03/07
70.2
KC3.3
1 2/03/07
70.3
KC3.3
1 2/03/07
71.5
KC3.3
1 2/03/07
78.4
KC3.3
1 2/03/07
83.5
KC3.3
1 2/03/07
66.8
KC3.3
1 2/03/07
63.6
KC3.3
1 2/03/07
195.9
KC3.3
1 2/03/07
73.1
KC3.3
1 2/03/07
71.6
KC3.3
1 2/04/07
72.2
KC3.3
1 2/04/07
72
KC3.3
1 2/04/07
74.4
KC3.3
1 2/04/07
73.2
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
72.2
KC3.3
1 2/04/07
74.2
KC3.3
1 2/04/07
73.6
KC3.3
1 2/04/07
79.6
KC3.3
1 2/04/07
81.4
KC3.3
1 2/04/07
73
KC3.3
1 2/04/07
71.3
KC3.3
1 2/04/07
70.2
KC3.3
1 2/04/07
70.8
KC3.3
1 2/04/07
70.8
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
72.3
KC3.3
1 2/04/07
73.4
KC3.3
1 2/04/07
72.6
KC3.3
1 2/04/07
74.2
KC3.3
1 2/04/07
75.9
KC3.3
1 2/04/07
100.8
KC3.3
1 2/04/07
82.1
KC3.3
1 2/04/07
70.7
KC3.3
1 2/04/07
71.7
KC3.3
1 2/04/07
72.1
KC3.3
1 2/04/07
72.9
KC3.3
1 2/04/07
73.4
KC3.3
1 2/04/07
75.3
KC3.3
1 2/04/07
75.4
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
75.5
KC3.3
1 2/04/07
73.9
KC3.3
1 2/04/07
73.9
F-371

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/04/07
75.7
KC3.3
1 2/04/07
99.4
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
91.4
KC3.3
1 2/04/07
71.5
KC3.3
1 2/04/07
71.9
KC3.3
1 2/04/07
72.9
KC3.3
1 2/04/07
70.5
KC3.3
1 2/04/07
70.5
KC3.3
1 2/04/07
70.7
KC3.3
1 2/04/07
72.8
KC3.3
1 2/04/07
72.6
KC3.3
1 2/04/07
73.7
KC3.3
1 2/04/07
73.4
KC3.3
1 2/04/07
73.7
KC3.3
1 2/04/07
71.9
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
73.9
KC3.3
1 2/04/07
75.4
KC3.3
1 2/04/07
79.9
KC3.3
1 2/04/07
101.6
KC3.3
1 2/04/07
71.7
KC3.3
1 2/04/07
72.5
KC3.3
1 2/04/07
71.4
KC3.3
1 2/04/07
71.1
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
75.2
KC3.3
1 2/04/07
74.8
KC3.3
1 2/04/07
76.6
KC3.3
1 2/04/07
73.6
KC3.3
1 2/04/07
72.3
KC3.3
1 2/04/07
73.6
KC3.3
1 2/04/07
72.7
KC3.3
1 2/04/07
74.7
KC3.3
1 2/04/07
76.2
KC3.3
1 2/04/07
77.3
KC3.3
1 2/04/07
76.6
KC3.3
1 2/04/07
76.2
KC3.3
1 2/04/07
74.8
KC3.3
1 2/04/07
74.2
KC3.3
1 2/04/07
75.4
KC3.3
1 2/04/07
67.2
KC3.3
1 2/04/07
69.8
KC3.3
1 2/04/07
71.9
KC3.3
1 2/04/07
72.6
F-372

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/04/07
77.3
KC3.3
1 2/04/07
75.5
KC3.3
1 2/04/07
73.2
KC3.3
1 2/04/07
72.5
KC3.3
1 2/04/07
71.6
KC3.3
1 2/04/07
75.1
KC3.3
1 2/04/07
79.2
KC3.3
1 2/04/07
79.8
KC3.3
1 2/04/07
82.9
KC3.3
1 2/04/07
85.5
KC3.3
1 2/04/07
99.8
KC3.3
1 2/04/07
73.5
KC3.3
1 2/04/07
177.1
KC3.3
1 2/04/07
100.6
KC3.3
1 2/04/07
83.1
KC3.3
1 2/05/07
64.7
KC3.3
1 2/05/07
67.2
KC3.3
1 2/05/07
73.4
KC3.3
1 2/05/07
73.6
KC3.3
1 2/05/07
69.8
KC3.3
1 2/05/07
69.8
KC3.3
1 2/05/07
69.3
KC3.3
1 2/05/07
69.4
KC3.3
1 2/05/07
71.2
KC3.3
1 2/05/07
84
KC3.3
1 2/05/07
80
KC3.3
1 2/05/07
77.6
KC3.3
1 2/05/07
72.6
KC3.3
1 2/05/07
92.6
KC3.3
1 2/05/07
69.3
KC3.3
1 2/05/07
71.2
KC3.3
1 2/1 7/07
110.8
KC3.3
1 2/1 7/07
117.8
KC3.3
1 2/1 7/07
42
KC3.3
1 2/1 7/07
41.1
KC3.3
1 2/1 7/07
41.4
KC3.3
1 2/1 7/07
41.4
KC3.3
1 2/1 7/07
41.5
KC3.3
1 2/1 7/07
41.3
KC3.3
1 2/1 7/07
41.4
KC3.3
1 2/1 7/07
41.3
KC3.3
1 2/1 7/07
41.3
KC3.3
1 2/1 7/07
41.1
KC3.3
1 2/1 7/07
40.5
KC3.3
1 2/1 7/07
40.7
F-373

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/1 7/07
40.6
KC3.3
1 2/1 7/07
45.2
KC3.3
1 2/1 7/07
39.7
KC3.3
1 2/1 7/07
39.1
KC3.3
1 2/1 7/07
37.5
KC3.3
1 2/1 7/07
37.5
KC3.3
1 2/1 7/07
39
KC3.3
1 2/1 7/07
34
KC3.3
1 2/1 7/07
32.4
KC3.3
1 2/1 7/07
31.7
KC3.3
1 2/1 7/07
32.2
KC3.3
1 2/1 7/07
32.1
KC3.3
1 2/1 7/07
32
KC3.3
1 2/1 7/07
31.8
KC3.3
1 2/1 7/07
35.5
KC3.3
1 2/1 7/07
28.2
KC3.3
1 2/1 7/07
24
KC3.3
1 2/1 7/07
41.8
KC3.3
1 2/18/07
33.1
KC3.3
1 2/18/07
31.3
KC3.3
1 2/18/07
31.9
KC3.3
1 2/18/07
32.6
KC3.3
1 2/18/07
32.9
KC3.3
1 2/18/07
33.3
KC3.3
1 2/18/07
33.5
KC3.3
1 2/18/07
34.3
KC3.3
1 2/18/07
35.8
KC3.3
1 2/18/07
36.7
KC3.3
1 2/18/07
34.6
KC3.3
1 2/18/07
34.5
KC3.3
1 2/18/07
33.8
KC3.3
1 2/18/07
35.2
KC3.3
1 2/18/07
36.3
KC3.3
1 2/18/07
36.8
KC3.3
1 2/18/07
39.6
KC3.3
1 2/18/07
42.7
KC3.3
1 2/18/07
43
KC3.3
1 2/18/07
42.5
KC3.3
1 2/18/07
42.4
KC3.3
1 2/18/07
42.2
KC3.3
1 2/18/07
41.4
KC3.3
1 2/18/07
41.4
KC3.3
1 2/18/07
41.9
KC3.3
1 2/18/07
42.7
KC3.3
1 2/18/07
43.2
F-374

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/18/07
42.7
KC3.3
1 2/18/07
42.7
KC3.3
1 2/18/07
42.4
KC3.3
1 2/18/07
42.7
KC3.3
1 2/18/07
43.7
KC3.3
1 2/18/07
50.9
KC3.3
1 2/18/07
62.2
KC3.3
1 2/18/07
44.8
KC3.3
1 2/18/07
39.9
KC3.3
1 2/18/07
38.4
KC3.3
1 2/18/07
38.1
KC3.3
1 2/18/07
38.4
KC3.3
1 2/18/07
39
KC3.3
1 2/18/07
38.7
KC3.3
1 2/18/07
41
KC3.3
1 2/18/07
39
KC3.3
1 2/18/07
41.8
KC3.3
1 2/18/07
40
KC3.3
1 2/18/07
33.9
KC3.3
1 2/18/07
34.1
KC3.3
1 2/18/07
34.8
KC3.3
1 2/18/07
35.7
KC3.3
1 2/18/07
36.3
KC3.3
1 2/18/07
36
KC3.3
1 2/18/07
39.4
KC3.3
1 2/18/07
39.3
KC3.3
1 2/18/07
45.3
KC3.3
1 2/18/07
35.6
KC3.3
1 2/18/07
37.4
KC3.3
1 2/18/07
36.8
KC3.3
1 2/18/07
37.7
KC3.3
1 2/18/07
37.8
KC3.3
1 2/18/07
35.8
KC3.3
1 2/18/07
36.7
KC3.3
1 2/18/07
33.5
KC3.3
1 2/18/07
52.4
KC3.3
1 2/19/07
24.3
KC3.3
1 2/19/07
24.4
KC3.3
1 2/19/07
24.2
KC3.3
1 2/19/07
24.2
KC3.3
1 2/19/07
24.1
KC3.3
1 2/19/07
24.5
KC3.3
1 2/19/07
25.2
KC3.3
1 2/19/07
25.2
KC3.3
1 2/19/07
25.1
F-375

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/19/07
25.3
KC3.3
1 2/19/07
25.3
KC3.3
1 2/19/07
25.8
KC3.3
1 2/19/07
25.8
KC3.3
1 2/19/07
25.8
KC3.3
1 2/19/07
26.1
KC3.3
1 2/19/07
25.7
KC3.3
1 2/19/07
25.9
KC3.3
1 2/19/07
26.2
KC3.3
1 2/19/07
26.3
KC3.3
1 2/19/07
26.2
KC3.3
1 2/19/07
26.2
KC3.3
1 2/19/07
26.6
KC3.3
1 2/19/07
26.8
KC3.3
1 2/19/07
27.3
KC3.3
1 2/19/07
27.4
KC3.3
1 2/19/07
27.3
KC3.3
1 2/19/07
27.3
KC3.3
1 2/19/07
27.4
KC3.3
1 2/19/07
28.3
KC3.3
1 2/19/07
28.3
KC3.3
1 2/19/07
28.4
KC3.3
1 2/19/07
28.2
KC3.3
1 2/19/07
28.2
KC3.3
1 2/19/07
28.6
KC3.3
1 2/19/07
28.8
KC3.3
1 2/19/07
28.7
KC3.3
1 2/19/07
28.9
KC3.3
1 2/19/07
29.3
KC3.3
1 2/19/07
29.3
KC3.3
1 2/19/07
29.6
KC3.3
1 2/19/07
29.8
KC3.3
1 2/19/07
29.9
KC3.3
1 2/19/07
30
KC3.3
1 2/19/07
30.8
KC3.3
1 2/19/07
30.7
KC3.3
1 2/19/07
31.3
KC3.3
1 2/19/07
31.3
KC3.3
1 2/19/07
31.6
KC3.3
1 2/19/07
31.6
KC3.3
1 2/19/07
32.1
KC3.3
1 2/19/07
32.4
KC3.3
1 2/19/07
32.4
KC3.3
1 2/19/07
33.3
KC3.3
1 2/19/07
33.4
F-376

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/19/07
33.8
KC3.3
1 2/19/07
34.5
KC3.3
1 2/19/07
34.7
KC3.3
1 2/19/07
36.5
KC3.3
1 2/19/07
43.1
KC3.3
1 2/19/07
59
KC3.3
1 2/19/07
35.6
KC3.3
1 2/19/07
34.6
KC3.3
1 2/19/07
34.9
KC3.3
1 2/19/07
34.5
KC3.3
1 2/19/07
34.5
KC3.3
1 2/19/07
34.7
KC3.3
1 2/19/07
35.5
KC3.3
1 2/19/07
35.5
KC3.3
1 2/19/07
35.5
KC3.3
1 2/19/07
35.6
KC3.3
1 2/19/07
34.6
KC3.3
1 2/19/07
37.4
KC3.3
1 2/19/07
82.9
KC3.3
1 2/19/07
31.4
KC3.3
1 2/20/07
66.3
KC3.3
1 2/20/07
65.9
KC3.3
1 2/20/07
67.4
KC3.3
1 2/20/07
66.1
KC3.3
1 2/20/07
64.5
KC3.3
1 2/20/07
65.9
KC3.3
1 2/20/07
64.3
KC3.3
1 2/20/07
65.5
KC3.3
1 2/20/07
65.5
KC3.3
1 2/20/07
65.1
KC3.3
1 2/20/07
64.9
KC3.3
1 2/20/07
64.6
KC3.3
1 2/20/07
55.2
KC3.3
1 2/20/07
23.5
KC3.3
1 2/20/07
20.2
KC3.3
1 2/20/07
20.6
KC3.3
1 2/20/07
20.8
KC3.3
1 2/20/07
20.8
KC3.3
1 2/20/07
21.3
KC3.3
1 2/20/07
21.2
KC3.3
1 2/20/07
21.8
KC3.3
1 2/20/07
21.9
KC3.3
1 2/20/07
22.4
KC3.3
1 2/20/07
22
KC3.3
1 2/20/07
21.8
F-377

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/20/07
21.8
KC3.3
1 2/20/07
21.7
KC3.3
1 2/20/07
22.4
KC3.3
1 2/20/07
22.7
KC3.3
1 2/20/07
22.9
KC3.3
1 2/20/07
23.2
KC3.3
1 2/20/07
23.6
KC3.3
1 2/20/07
24
KC3.3
1 2/20/07
22.8
KC3.3
1 2/20/07
22.8
KC3.3
1 2/20/07
22.8
KC3.3
1 2/20/07
23.3
KC3.3
1 2/20/07
23.5
KC3.3
1 2/20/07
23.9
KC3.3
1 2/20/07
24.9
KC3.3
1 2/20/07
25.9
KC3.3
1 2/20/07
26.4
KC3.3
1 2/20/07
27.3
KC3.3
1 2/20/07
27.8
KC3.3
1 2/20/07
41.2
KC3.3
1 2/20/07
24.3
KC3.3
12/22/07
37.1
KC3.3
12/22/07
36.7
KC3.3
12/22/07
36.7
KC3.3
12/22/07
41.7
KC3.3
12/22/07
43.8
KC3.3
12/22/07
42.8
KC3.3
12/22/07
40.5
KC3.3
12/22/07
38.6
KC3.3
12/22/07
41.2
KC3.3
12/22/07
41.9
KC3.3
12/22/07
43.3
KC3.3
12/22/07
40.7
KC3.3
12/22/07
37.4
KC3.3
12/22/07
42.1
KC3.3
12/22/07
45.4
KC3.3
12/22/07
46.7
KC3.3
12/22/07
49.7
KC3.3
12/22/07
48.6
KC3.3
12/22/07
48.1
KC3.3
12/22/07
45
KC3.3
12/22/07
42
KC3.3
12/22/07
44.8
KC3.3
12/22/07
48.3
KC3.3
12/22/07
48.5
F-378

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
12/22/07
52.1
KC3.3
12/22/07
52.1
KC3.3
12/22/07
50.6
KC3.3
12/22/07
48.3
KC3.3
12/22/07
48.4
KC3.3
12/22/07
47.4
KC3.3
12/22/07
41.9
KC3.3
12/22/07
37.3
KC3.3
12/22/07
34.3
KC3.3
12/22/07
31.8
KC3.3
12/22/07
29.7
KC3.3
12/22/07
29
KC3.3
12/22/07
28.4
KC3.3
12/22/07
26.8
KC3.3
12/22/07
27
KC3.3
12/22/07
26.5
KC3.3
12/22/07
28.4
KC3.3
12/22/07
28.1
KC3.3
12/22/07
27.9
KC3.3
12/22/07
28.7
KC3.3
12/22/07
28.7
KC3.3
12/22/07
29.7
KC3.3
12/22/07
30.6
KC3.3
12/22/07
31.2
KC3.3
12/22/07
30.9
KC3.3
12/22/07
32.2
KC3.3
12/22/07
31.3
KC3.3
12/22/07
52.4
KC3.3
12/23/07
28.1
KC3.3
12/23/07
31.7
KC3.3
12/23/07
30.7
KC3.3
12/23/07
32.8
KC3.3
12/23/07
33.7
KC3.3
12/23/07
32
KC3.3
12/23/07
31.9
KC3.3
12/23/07
34.1
KC3.3
12/23/07
36.9
KC3.3
12/23/07
38.3
KC3.3
12/23/07
39.5
KC3.3
12/23/07
39.1
KC3.3
12/23/07
35.5
KC3.3
12/23/07
33.9
KC3.3
12/23/07
32.1
KC3.3
12/23/07
33.6
KC3.3
12/23/07
34.9
F-379

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
12/23/07
30.6
KC3.3
12/23/07
29.8
KC3.3
12/23/07
31.3
KC3.3
12/23/07
33.2
KC3.3
12/23/07
32.5
KC3.3
12/23/07
29.8
KC3.3
12/23/07
32.4
KC3.3
12/23/07
34.7
KC3.3
12/23/07
36.1
KC3.3
12/23/07
36.3
KC3.3
12/23/07
35.7
KC3.3
12/23/07
33.1
KC3.3
12/23/07
34
KC3.3
12/23/07
33.8
KC3.3
12/23/07
32.8
KC3.3
12/23/07
30.1
KC3.3
12/23/07
27.6
KC3.3
12/23/07
28.1
KC3.3
12/23/07
28.4
KC3.3
12/23/07
29.1
KC3.3
12/23/07
29.2
KC3.3
12/23/07
26.7
KC3.3
12/23/07
26
KC3.3
12/23/07
26.8
KC3.3
12/23/07
30.8
KC3.3
12/23/07
34
KC3.3
12/23/07
26.2
KC3.3
12/23/07
24.6
KC3.3
12/23/07
24.2
KC3.3
12/23/07
23.9
KC3.3
12/23/07
24.1
KC3.3
12/23/07
87.5
KC3.3
1 2/26/07
20.5
KC3.3
1 2/26/07
13
KC3.3
1 2/26/07
12.5
KC3.3
1 2/26/07
11.1
KC3.3
1 2/26/07
10.9
KC3.3
1 2/26/07
11.2
KC3.3
1 2/26/07
11.5
KC3.3
1 2/26/07
12.2
KC3.3
1 2/26/07
13
KC3.3
1 2/26/07
13.4
KC3.3
1 2/26/07
14.3
KC3.3
1 2/26/07
14.2
KC3.3
1 2/26/07
12.7
F-380

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/26/07
12.9
KC3.3
1 2/26/07
13.1
KC3.3
1 2/26/07
13.2
KC3.3
1 2/26/07
13.6
KC3.3
1 2/26/07
42.7
KC3.3
12/27/07
20.9
KC3.3
12/27/07
20.6
KC3.3
12/27/07
19.8
KC3.3
12/27/07
20.7
KC3.3
12/27/07
21.3
KC3.3
12/27/07
20
KC3.3
12/27/07
18.7
KC3.3
12/27/07
18.5
KC3.3
12/27/07
19.1
KC3.3
12/27/07
19.4
KC3.3
12/27/07
17.8
KC3.3
12/27/07
17.7
KC3.3
12/27/07
16.6
KC3.3
12/27/07
16.4
KC3.3
12/27/07
16.4
KC3.3
12/27/07
17.2
KC3.3
12/27/07
17.8
KC3.3
12/27/07
17.6
KC3.3
12/27/07
16.9
KC3.3
12/27/07
16.1
KC3.3
12/27/07
15.5
KC3.3
12/27/07
14.8
KC3.3
12/27/07
13.7
KC3.3
12/27/07
13.3
KC3.3
12/27/07
12.6
KC3.3
12/27/07
11.5
KC3.3
12/27/07
11.1
KC3.3
12/27/07
10.1
KC3.3
12/27/07
58.4
KC3.3
1 2/28/07
17.8
KC3.3
1 2/28/07
17.6
KC3.3
1 2/28/07
17.3
KC3.3
1 2/28/07
17
KC3.3
1 2/28/07
17.6
KC3.3
1 2/28/07
18.6
KC3.3
1 2/28/07
19.8
KC3.3
1 2/28/07
21.1
KC3.3
1 2/28/07
23.2
KC3.3
1 2/28/07
27.8
KC3.3
1 2/28/07
21.2
F-381

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.3
1 2/28/07
20.5
KC3.3
1 2/28/07
20
KC3.3
1 2/28/07
19.2
KC3.3
1 2/28/07
19.8
KC3.3
1 2/28/07
19.2
KC3.3
1 2/28/07
19.6
KC3.3
1 2/28/07
19.8
KC3.3
1 2/28/07
19.6
KC3.3
1 2/28/07
19.4
KC3.3
1 2/28/07
18.8
KC3.3
1 2/28/07
19.5
KC3.3
1 2/28/07
19.2
KC3.3
1 2/28/07
18.8
KC3.3
1 2/28/07
18.8
KC3.3
1 2/28/07
19.7
KC3.3
1 2/28/07
20.4
KC3.3
1 2/28/07
20.8
KC3.3
1 2/28/07
20.3
KC3.3
1 2/28/07
23.9
KC3.3
1 2/28/07
18.1
KC3.3
1 2/28/07
17.6
KC3.3
1 2/28/07
17.3
KC3.3
1 2/28/07
22.2
KC3.3
1 2/28/07
21.5
KC3.3
1 2/28/07
20.9
KC3.3
1 2/30/07
14.8
KC3.3
1 2/30/07
15.7
KC3.3
1 2/30/07
15.3
KC3.3
1 2/30/07
14.1
KC3.3
1 2/30/07
16
KC3.3
1 2/30/07
16.5
KC3.3
1 2/30/07
17.7
KC3.3
1 2/30/07
18.4
KC3.3
1 2/30/07
19.6
KC3.3
1 2/30/07
18.4
KC3.3
1 2/30/07
18.2
KC3.3
1 2/30/07
19
KC3.3
1 2/30/07
21.6
KC3.3
1 2/30/07
22.7
KC3.3
1 2/30/07
14.9
KC3.3
1 2/30/07
11
KC3.3
1 2/30/07
65.3
KC3.4
12/01/07
31.8
KC3.4
12/01/07
27
KC3.4
12/01/07
30.2
F-382

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
12/01/07
43.5
KC3.4
1 2/02/07
66.8
KC3.4
1 2/02/07
66.5
KC3.4
1 2/02/07
66.6
KC3.4
1 2/02/07
68.2
KC3.4
1 2/02/07
68
KC3.4
1 2/02/07
67.5
KC3.4
1 2/02/07
68.1
KC3.4
1 2/02/07
68.4
KC3.4
1 2/02/07
67.7
KC3.4
1 2/02/07
67.5
KC3.4
1 2/02/07
67.4
KC3.4
1 2/02/07
67.2
KC3.4
1 2/02/07
67.2
KC3.4
1 2/02/07
66.6
KC3.4
1 2/02/07
66.5
KC3.4
1 2/02/07
66.9
KC3.4
1 2/02/07
67.8
KC3.4
1 2/02/07
67.7
KC3.4
1 2/02/07
68.5
KC3.4
1 2/02/07
69.3
KC3.4
1 2/02/07
69.8
KC3.4
1 2/02/07
69.3
KC3.4
1 2/02/07
69.3
KC3.4
1 2/02/07
68.6
KC3.4
1 2/02/07
68.3
KC3.4
1 2/02/07
68
KC3.4
1 2/02/07
67.6
KC3.4
1 2/02/07
66.9
KC3.4
1 2/02/07
66.4
KC3.4
1 2/02/07
65.5
KC3.4
1 2/02/07
63.5
KC3.4
1 2/02/07
63
KC3.4
1 2/02/07
64.3
KC3.4
1 2/02/07
61.2
KC3.4
1 2/02/07
60.4
KC3.4
1 2/02/07
61.1
KC3.4
1 2/02/07
59.7
KC3.4
1 2/02/07
58.3
KC3.4
1 2/02/07
57.6
KC3.4
1 2/02/07
56.6
KC3.4
1 2/02/07
55.5
KC3.4
1 2/02/07
55.1
KC3.4
1 2/02/07
53.5
KC3.4
1 2/02/07
52.6
F-383

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/02/07
50.9
KC3.4
1 2/02/07
48.7
KC3.4
1 2/02/07
48
KC3.4
1 2/02/07
47.3
KC3.4
1 2/02/07
49.3
KC3.4
1 2/02/07
50.3
KC3.4
1 2/02/07
51
KC3.4
1 2/02/07
52
KC3.4
1 2/02/07
52.2
KC3.4
1 2/02/07
52.1
KC3.4
1 2/02/07
50.3
KC3.4
1 2/02/07
51.1
KC3.4
1 2/02/07
52.3
KC3.4
1 2/02/07
51.8
KC3.4
1 2/02/07
51.7
KC3.4
1 2/02/07
52.6
KC3.4
1 2/02/07
51.8
KC3.4
1 2/02/07
52.5
KC3.4
1 2/02/07
54.6
KC3.4
1 2/02/07
54.6
KC3.4
1 2/02/07
52.9
KC3.4
1 2/02/07
53.2
KC3.4
1 2/02/07
54.4
KC3.4
1 2/02/07
55.6
KC3.4
1 2/02/07
57.1
KC3.4
1 2/02/07
57.4
KC3.4
1 2/02/07
58.5
KC3.4
1 2/02/07
60.8
KC3.4
1 2/02/07
60.9
KC3.4
1 2/02/07
60.2
KC3.4
1 2/02/07
57.3
KC3.4
1 2/02/07
56.7
KC3.4
1 2/02/07
56.5
KC3.4
1 2/02/07
57.3
KC3.4
1 2/02/07
57.3
KC3.4
1 2/02/07
55.5
KC3.4
1 2/02/07
52.3
KC3.4
1 2/02/07
47.4
KC3.4
1 2/02/07
42.6
KC3.4
1 2/02/07
40.3
KC3.4
1 2/02/07
37.7
KC3.4
1 2/02/07
36.3
KC3.4
1 2/02/07
34.9
KC3.4
1 2/02/07
35
KC3.4
1 2/02/07
36.1
F-384

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/02/07
41.4
KC3.4
1 2/02/07
48.3
KC3.4
1 2/02/07
57.6
KC3.4
1 2/02/07
30.5
KC3.4
1 2/03/07
73.3
KC3.4
1 2/03/07
71.8
KC3.4
1 2/03/07
73.3
KC3.4
1 2/03/07
73.1
KC3.4
1 2/03/07
74.6
KC3.4
1 2/03/07
72.3
KC3.4
1 2/03/07
73.9
KC3.4
1 2/03/07
74.2
KC3.4
1 2/03/07
74.4
KC3.4
1 2/03/07
75.9
KC3.4
1 2/03/07
76.8
KC3.4
1 2/03/07
75.4
KC3.4
1 2/03/07
73.9
KC3.4
1 2/03/07
72.4
KC3.4
1 2/03/07
71.3
KC3.4
1 2/03/07
70.4
KC3.4
1 2/03/07
69.8
KC3.4
1 2/03/07
68.8
KC3.4
1 2/03/07
68.7
KC3.4
1 2/03/07
68.7
KC3.4
1 2/03/07
67.9
KC3.4
1 2/03/07
67.6
KC3.4
1 2/03/07
68.7
KC3.4
1 2/03/07
70.5
KC3.4
1 2/03/07
70.5
KC3.4
1 2/03/07
70.7
KC3.4
1 2/03/07
72
KC3.4
1 2/03/07
72.2
KC3.4
1 2/03/07
72.5
KC3.4
1 2/03/07
72.2
KC3.4
1 2/03/07
72.5
KC3.4
1 2/03/07
73.4
KC3.4
1 2/03/07
74.8
KC3.4
1 2/03/07
75.3
KC3.4
1 2/03/07
74.6
KC3.4
1 2/03/07
74
KC3.4
1 2/03/07
72.7
KC3.4
1 2/03/07
72.2
KC3.4
1 2/03/07
71.3
KC3.4
1 2/03/07
70.5
KC3.4
1 2/03/07
71.4
F-385

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/03/07
70.9
KC3.4
1 2/03/07
71
KC3.4
1 2/03/07
69.4
KC3.4
1 2/03/07
69.6
KC3.4
1 2/03/07
71.4
KC3.4
1 2/03/07
72.7
KC3.4
1 2/03/07
74.3
KC3.4
1 2/03/07
75.5
KC3.4
1 2/03/07
76.2
KC3.4
1 2/03/07
74.5
KC3.4
1 2/03/07
69.4
KC3.4
1 2/03/07
68.1
KC3.4
1 2/03/07
69.4
KC3.4
1 2/03/07
71.7
KC3.4
1 2/03/07
75.5
KC3.4
1 2/03/07
77.3
KC3.4
1 2/03/07
73.6
KC3.4
1 2/03/07
72.7
KC3.4
1 2/03/07
75.1
KC3.4
1 2/03/07
76.2
KC3.4
1 2/03/07
76.6
KC3.4
1 2/03/07
76.9
KC3.4
1 2/03/07
77.3
KC3.4
1 2/03/07
77.3
KC3.4
1 2/03/07
77.4
KC3.4
1 2/03/07
78.2
KC3.4
1 2/03/07
79.6
KC3.4
1 2/03/07
80.1
KC3.4
1 2/03/07
80.3
KC3.4
1 2/03/07
79.9
KC3.4
1 2/03/07
75.9
KC3.4
1 2/03/07
74.4
KC3.4
1 2/03/07
76.3
KC3.4
1 2/03/07
78.5
KC3.4
1 2/03/07
78.7
KC3.4
1 2/03/07
78.6
KC3.4
1 2/03/07
77.1
KC3.4
1 2/03/07
76.8
KC3.4
1 2/03/07
74
KC3.4
1 2/03/07
69.6
KC3.4
1 2/03/07
69.3
KC3.4
1 2/03/07
70
KC3.4
1 2/03/07
72.8
KC3.4
1 2/03/07
71.4
KC3.4
1 2/03/07
71.4
F-386

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/03/07
73
KC3.4
1 2/03/07
70.4
KC3.4
1 2/03/07
71.7
KC3.4
1 2/03/07
78.5
KC3.4
1 2/03/07
83.1
KC3.4
1 2/03/07
68.7
KC3.4
1 2/03/07
65.8
KC3.4
1 2/03/07
69.3
KC3.4
1 2/03/07
98.3
KC3.4
1 2/03/07
67.7
KC3.4
1 2/04/07
67.3
KC3.4
1 2/04/07
67.7
KC3.4
1 2/04/07
67.3
KC3.4
1 2/04/07
71.4
KC3.4
1 2/04/07
66.6
KC3.4
1 2/04/07
67.4
KC3.4
1 2/04/07
69.5
KC3.4
1 2/04/07
67.4
KC3.4
1 2/04/07
69.9
KC3.4
1 2/04/07
67.9
KC3.4
1 2/04/07
68
KC3.4
1 2/04/07
69.7
KC3.4
1 2/04/07
66.4
KC3.4
1 2/04/07
66.8
KC3.4
1 2/04/07
70.7
KC3.4
1 2/04/07
68.6
KC3.4
1 2/04/07
67.7
KC3.4
1 2/04/07
72.3
KC3.4
1 2/04/07
69.3
KC3.4
1 2/04/07
69.7
KC3.4
1 2/04/07
74.9
KC3.4
1 2/04/07
72.5
KC3.4
1 2/04/07
70.9
KC3.4
1 2/04/07
71.9
KC3.4
1 2/04/07
67.4
KC3.4
1 2/04/07
68.2
KC3.4
1 2/04/07
71.3
KC3.4
1 2/04/07
69.1
KC3.4
1 2/04/07
69.3
KC3.4
1 2/04/07
72.8
KC3.4
1 2/04/07
70.6
KC3.4
1 2/04/07
70.5
KC3.4
1 2/04/07
71.8
KC3.4
1 2/04/07
71.7
KC3.4
1 2/04/07
72.9
F-387

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/04/07
72.5
KC3.4
1 2/04/07
70.2
KC3.4
1 2/04/07
70.1
KC3.4
1 2/04/07
70.2
KC3.4
1 2/04/07
224.6
KC3.4
1 2/04/07
69.8
KC3.4
1 2/04/07
70.5
KC3.4
1 2/04/07
70.9
KC3.4
1 2/04/07
70.1
KC3.4
1 2/04/07
73
KC3.4
1 2/04/07
71.4
KC3.4
1 2/04/07
72.6
KC3.4
1 2/04/07
72.3
KC3.4
1 2/04/07
71.3
KC3.4
1 2/04/07
69.9
KC3.4
1 2/04/07
70.2
KC3.4
1 2/04/07
70.8
KC3.4
1 2/04/07
72
KC3.4
1 2/04/07
132
KC3.4
1 2/04/07
97.4
KC3.4
1 2/04/07
68.8
KC3.4
1 2/04/07
64.2
KC3.4
1 2/04/07
65.3
KC3.4
1 2/04/07
65.7
KC3.4
1 2/04/07
67.7
KC3.4
1 2/04/07
68.6
KC3.4
1 2/04/07
68.4
KC3.4
1 2/04/07
67.6
KC3.4
1 2/04/07
66.4
KC3.4
1 2/04/07
66
KC3.4
1 2/04/07
67.2
KC3.4
1 2/04/07
66.5
KC3.4
1 2/04/07
66.4
KC3.4
1 2/04/07
68.4
KC3.4
1 2/04/07
70.8
KC3.4
1 2/04/07
69.3
KC3.4
1 2/04/07
68.7
KC3.4
1 2/04/07
65.7
KC3.4
1 2/04/07
65.2
KC3.4
1 2/04/07
65.4
KC3.4
1 2/04/07
59.9
KC3.4
1 2/04/07
62.6
KC3.4
1 2/04/07
65.3
KC3.4
1 2/04/07
65.9
KC3.4
1 2/04/07
70.5
F-388

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/04/07
69.2
KC3.4
1 2/04/07
66.5
KC3.4
1 2/04/07
65
KC3.4
1 2/04/07
66.6
KC3.4
1 2/04/07
69.7
KC3.4
1 2/04/07
71.7
KC3.4
1 2/04/07
74.7
KC3.4
1 2/04/07
73.4
KC3.4
1 2/04/07
72.3
KC3.4
1 2/04/07
70.4
KC3.4
1 2/04/07
71.6
KC3.4
1 2/04/07
73.7
KC3.4
1 2/04/07
155.1
KC3.4
1 2/04/07
71.5
KC3.4
1 2/04/07
73.4
KC3.4
1 2/05/07
65.7
KC3.4
1 2/05/07
63.6
KC3.4
1 2/05/07
65.2
KC3.4
1 2/05/07
64.7
KC3.4
1 2/05/07
64.6
KC3.4
1 2/05/07
66.2
KC3.4
1 2/05/07
72.5
KC3.4
1 2/05/07
66
KC3.4
1 2/05/07
65.7
KC3.4
1 2/05/07
64.2
KC3.4
1 2/05/07
59
KC3.4
1 2/05/07
67.5
KC3.4
1 2/05/07
70.7
KC3.4
1 2/05/07
66.6
KC3.4
1 2/15/07
34.1
KC3.4
1 2/15/07
33.5
KC3.4
1 2/15/07
29.5
KC3.4
1 2/15/07
29.3
KC3.4
1 2/15/07
29.7
KC3.4
1 2/15/07
32
KC3.4
1 2/15/07
33.2
KC3.4
1 2/15/07
34.8
KC3.4
1 2/15/07
36.1
KC3.4
1 2/15/07
35
KC3.4
1 2/15/07
33.5
KC3.4
1 2/15/07
33.8
KC3.4
1 2/15/07
34.7
KC3.4
1 2/15/07
32.3
KC3.4
1 2/15/07
28.6
KC3.4
1 2/15/07
25.9
F-389

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/15/07
25.3
KC3.4
1 2/15/07
24.5
KC3.4
1 2/15/07
24.5
KC3.4
1 2/15/07
26
KC3.4
1 2/15/07
27.1
KC3.4
1 2/15/07
27.6
KC3.4
1 2/15/07
22.8
KC3.4
1 2/15/07
20
KC3.4
1 2/15/07
19.6
KC3.4
1 2/15/07
32.8
KC3.4
1 2/15/07
18
KC3.4
1 2/15/07
16.2
KC3.4
1 2/15/07
12.7
KC3.4
1 2/15/07
15.7
KC3.4
1 2/18/07
37.6
KC3.4
1 2/18/07
37.8
KC3.4
1 2/18/07
37.9
KC3.4
1 2/18/07
39.7
KC3.4
1 2/18/07
43.1
KC3.4
1 2/18/07
39.6
KC3.4
1 2/18/07
40.9
KC3.4
1 2/18/07
41.2
KC3.4
1 2/18/07
42.3
KC3.4
1 2/18/07
43
KC3.4
1 2/18/07
43.9
KC3.4
1 2/18/07
45.8
KC3.4
1 2/18/07
43.8
KC3.4
1 2/18/07
42.8
KC3.4
1 2/18/07
46.3
KC3.4
1 2/18/07
46.3
KC3.4
1 2/18/07
48.9
KC3.4
1 2/18/07
51.8
KC3.4
1 2/18/07
52.2
KC3.4
1 2/18/07
51.2
KC3.4
1 2/18/07
51.1
KC3.4
1 2/18/07
50.4
KC3.4
1 2/18/07
50.1
KC3.4
1 2/18/07
50.4
KC3.4
1 2/18/07
49.8
KC3.4
1 2/18/07
50.5
KC3.4
1 2/18/07
51.6
KC3.4
1 2/18/07
51.2
KC3.4
1 2/18/07
49.7
KC3.4
1 2/18/07
49
KC3.4
1 2/18/07
48.9
F-390

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/18/07
48.5
KC3.4
1 2/18/07
48.3
KC3.4
1 2/18/07
53.8
KC3.4
1 2/18/07
43.9
KC3.4
1 2/18/07
53.9
KC3.4
1 2/19/07
47.9
KC3.4
1 2/19/07
48.7
KC3.4
1 2/19/07
51.5
KC3.4
1 2/19/07
51
KC3.4
1 2/19/07
50.5
KC3.4
1 2/19/07
52.3
KC3.4
1 2/19/07
53.4
KC3.4
1 2/19/07
51.4
KC3.4
1 2/19/07
53.2
KC3.4
1 2/19/07
51.5
KC3.4
1 2/19/07
51.5
KC3.4
1 2/19/07
51.2
KC3.4
1 2/19/07
54.2
KC3.4
1 2/19/07
53.6
KC3.4
1 2/19/07
51.9
KC3.4
1 2/19/07
52.1
KC3.4
1 2/19/07
52.2
KC3.4
1 2/19/07
51
KC3.4
1 2/19/07
50.6
KC3.4
1 2/19/07
50.1
KC3.4
1 2/19/07
45.3
KC3.4
1 2/19/07
40
KC3.4
1 2/19/07
31.2
KC3.4
1 2/19/07
44.2
KC3.4
1 2/19/07
42.2
KC3.4
1 2/19/07
42.8
KC3.4
1 2/19/07
42.1
KC3.4
1 2/19/07
40.5
KC3.4
1 2/19/07
40.5
KC3.4
1 2/19/07
39.9
KC3.4
1 2/19/07
39.9
KC3.4
1 2/19/07
40.3
KC3.4
1 2/19/07
39.2
KC3.4
1 2/19/07
44.5
KC3.4
1 2/19/07
38.9
KC3.4
1 2/20/07
70.1
KC3.4
1 2/20/07
62.5
KC3.4
1 2/20/07
63
KC3.4
1 2/20/07
63.9
KC3.4
1 2/20/07
63.4
F-391

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/20/07
64.3
KC3.4
1 2/20/07
63.6
KC3.4
1 2/20/07
63.9
KC3.4
1 2/20/07
63.6
KC3.4
1 2/20/07
63.6
KC3.4
1 2/20/07
65
KC3.4
1 2/20/07
64.9
KC3.4
1 2/20/07
65.7
KC3.4
1 2/20/07
65.5
KC3.4
1 2/20/07
66.1
KC3.4
1 2/20/07
66.1
KC3.4
1 2/20/07
65.7
KC3.4
1 2/20/07
64.8
KC3.4
1 2/20/07
65.2
KC3.4
1 2/20/07
64.8
KC3.4
1 2/20/07
60.2
KC3.4
1 2/20/07
59.8
KC3.4
1 2/20/07
58.8
KC3.4
1 2/20/07
60
KC3.4
1 2/20/07
61.5
KC3.4
1 2/20/07
63.8
KC3.4
1 2/20/07
60.1
KC3.4
1 2/20/07
57
KC3.4
1 2/20/07
55.7
KC3.4
1 2/20/07
60.2
KC3.4
1 2/20/07
61.6
KC3.4
1 2/20/07
62.9
KC3.4
1 2/20/07
64.1
KC3.4
1 2/20/07
64.2
KC3.4
1 2/20/07
63.3
KC3.4
1 2/20/07
63.9
KC3.4
1 2/20/07
62.6
KC3.4
1 2/20/07
63.1
KC3.4
1 2/20/07
62.8
KC3.4
1 2/20/07
65.8
KC3.4
1 2/20/07
66.3
KC3.4
1 2/20/07
65.2
KC3.4
1 2/20/07
50.4
KC3.4
1 2/20/07
50.7
KC3.4
1 2/20/07
165.5
KC3.4
1 2/20/07
56.8
KC3.4
1 2/20/07
45.5
KC3.4
12/22/07
44.9
KC3.4
12/22/07
38
KC3.4
12/22/07
41.6
F-392

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
12/22/07
46.1
KC3.4
12/22/07
44.2
KC3.4
12/22/07
43.2
KC3.4
12/22/07
40.8
KC3.4
12/22/07
45.2
KC3.4
12/22/07
42.1
KC3.4
12/22/07
42.7
KC3.4
12/22/07
44.6
KC3.4
12/22/07
41.6
KC3.4
12/22/07
46.5
KC3.4
12/22/07
44.8
KC3.4
12/22/07
45.8
KC3.4
12/22/07
47.1
KC3.4
12/22/07
48.5
KC3.4
12/22/07
50.8
KC3.4
12/22/07
48.2
KC3.4
12/22/07
46.5
KC3.4
12/22/07
50.5
KC3.4
12/22/07
46.8
KC3.4
12/22/07
49.7
KC3.4
12/22/07
51.2
KC3.4
12/22/07
56.8
KC3.4
12/22/07
53.3
KC3.4
12/22/07
51.3
KC3.4
12/22/07
51.3
KC3.4
12/22/07
48.9
KC3.4
12/22/07
47.1
KC3.4
12/22/07
44.9
KC3.4
12/22/07
40.4
KC3.4
12/22/07
36.7
KC3.4
12/22/07
46.2
KC3.4
12/22/07
31.1
KC3.4
12/22/07
30.6
KC3.4
12/22/07
28.2
KC3.4
12/22/07
33.2
KC3.4
12/22/07
31.1
KC3.4
12/22/07
30.3
KC3.4
12/22/07
30.1
KC3.4
12/22/07
30.6
KC3.4
12/22/07
31.5
KC3.4
12/22/07
32.4
KC3.4
12/22/07
33.1
KC3.4
12/22/07
56
KC3.4
12/22/07
36.3
KC3.4
12/22/07
144.1
F-393

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
12/23/07
25.8
KC3.4
12/23/07
55.6
KC3.4
12/23/07
30.5
KC3.4
12/23/07
31.8
KC3.4
12/23/07
33.5
KC3.4
12/23/07
35.2
KC3.4
12/23/07
35.8
KC3.4
12/23/07
34.5
KC3.4
12/23/07
36.6
KC3.4
12/23/07
36.6
KC3.4
12/23/07
39.4
KC3.4
12/23/07
40.6
KC3.4
12/23/07
41.9
KC3.4
12/23/07
40.9
KC3.4
12/23/07
37.6
KC3.4
12/23/07
36
KC3.4
12/23/07
35.4
KC3.4
12/23/07
36.1
KC3.4
12/23/07
36.3
KC3.4
12/23/07
32.8
KC3.4
12/23/07
32.9
KC3.4
12/23/07
34
KC3.4
12/23/07
35.2
KC3.4
12/23/07
34.4
KC3.4
12/23/07
32.5
KC3.4
12/23/07
35.7
KC3.4
12/23/07
37.1
KC3.4
12/23/07
38.1
KC3.4
12/23/07
38
KC3.4
12/23/07
35.8
KC3.4
12/23/07
36.5
KC3.4
12/23/07
36
KC3.4
12/23/07
36.7
KC3.4
12/23/07
34.6
KC3.4
12/23/07
31
KC3.4
12/23/07
30.3
KC3.4
12/23/07
29.8
KC3.4
12/23/07
30.1
KC3.4
12/23/07
30.9
KC3.4
12/23/07
30.3
KC3.4
12/23/07
27.8
KC3.4
12/23/07
46.2
KC3.4
12/23/07
43.1
KC3.4
12/23/07
32.7
KC3.4
12/23/07
26.8
F-394

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
12/23/07
44.5
KC3.4
1 2/26/07
15
KC3.4
1 2/26/07
14
KC3.4
1 2/26/07
12.8
KC3.4
1 2/26/07
12.3
KC3.4
1 2/26/07
12.3
KC3.4
1 2/26/07
12.6
KC3.4
1 2/26/07
13.3
KC3.4
1 2/26/07
14.1
KC3.4
1 2/26/07
14.5
KC3.4
1 2/26/07
20.2
KC3.4
1 2/26/07
15.6
KC3.4
1 2/26/07
14.9
KC3.4
1 2/26/07
14.2
KC3.4
1 2/26/07
14.3
KC3.4
1 2/26/07
14.6
KC3.4
1 2/26/07
14.9
KC3.4
1 2/26/07
15.8
KC3.4
1 2/26/07
64.8
KC3.4
12/27/07
22.8
KC3.4
12/27/07
22.5
KC3.4
12/27/07
22
KC3.4
12/27/07
22.4
KC3.4
12/27/07
22.7
KC3.4
12/27/07
21
KC3.4
12/27/07
20.4
KC3.4
12/27/07
20.3
KC3.4
12/27/07
21.1
KC3.4
12/27/07
22.6
KC3.4
12/27/07
19.3
KC3.4
12/27/07
19
KC3.4
12/27/07
23
KC3.4
12/27/07
17.8
KC3.4
12/27/07
18.2
KC3.4
12/27/07
19.4
KC3.4
12/27/07
28.2
KC3.4
1 2/28/07
45.1
KC3.4
1 2/28/07
23.9
KC3.4
1 2/28/07
21.3
KC3.4
1 2/28/07
20.2
KC3.4
1 2/28/07
20.7
KC3.4
1 2/28/07
21.2
KC3.4
1 2/28/07
20.6
KC3.4
1 2/28/07
20.5
KC3.4
1 2/28/07
20.9
F-395

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.4
1 2/28/07
20.2
KC3.4
1 2/28/07
20
KC3.4
1 2/28/07
19.8
KC3.4
1 2/28/07
20.3
KC3.4
1 2/28/07
20.5
KC3.4
1 2/28/07
20.1
KC3.4
1 2/28/07
19.9
KC3.4
1 2/28/07
20.8
KC3.4
1 2/28/07
21.8
KC3.4
1 2/28/07
22.2
KC3.4
1 2/28/07
24.1
KC3.4
1 2/28/07
19.9
KC3.4
1 2/28/07
19.4
KC3.4
1 2/28/07
19.1
KC3.4
1 2/28/07
19.4
KC3.4
1 2/28/07
20.1
KC3.4
1 2/28/07
21.9
KC3.4
1 2/28/07
33.4
KC3.4
1 2/28/07
22.3
KC3.4
1 2/30/07
0.4
KC3.4
1 2/30/07
3.5
KC3.4
1 2/30/07
11.2
KC3.4
1 2/30/07
16.7
KC3.4
1 2/30/07
15.9
KC3.4
1 2/30/07
15.4
KC3.4
1 2/30/07
16.3
KC3.4
1 2/30/07
18.1
KC3.4
1 2/30/07
18.3
KC3.4
1 2/30/07
19
KC3.4
1 2/30/07
19.6
KC3.4
1 2/30/07
23.1
KC3.4
1 2/30/07
22.7
KC3.4
1 2/30/07
16
KC3.4
1 2/30/07
17.5
KC3.Pond
01/04/08
50.5
KC3.Pond
01/04/08
16.4
KC3.Pond
01/04/08
16.6
KC3.Pond
01/04/08
17
KC3.Pond
01/08/08
37.4
KC3.Pond
01/08/08
32.6
KC3.Pond
01/08/08
32.9
KC3.Pond
01/08/08
32.7
KC3.Pond
01/09/08
71
KC3.Pond
01/09/08
48.6
KC3.Pond
01/09/08
48.9
F-396

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.Pond
01/09/08
48.2
KC3.Pond
01/09/08
49.3
KC3.Pond
01/09/08
39.6
KC3.Pond
01/09/08
41.4
KC3.Pond
01/09/08
43.6
KC3.Pond
01/09/08
49.7
KC3.Pond
01/09/08
42.1
KC3.Pond
01/09/08
44.3
KC3.Pond
01/09/08
45.7
KC3.Pond
01/09/08
52.1
KC3.Pond
01/09/08
44
KC3.Pond
01/09/08
44.7
KC3.Pond
01/09/08
22.1
KC3.Pond
01/09/08
15.5
KC3.Pond
01/09/08
15.3
KC3.Pond
01/09/08
15
KC3.Pond
01/09/08
11.5
KC3.Pond
01/09/08
11.1
KC3.Pond
01/10/08
10.4
KC3.Pond
01/10/08
28.7
KC3.Pond
01/10/08
44.5
KC3.Pond
01/10/08
48.7
KC3.Pond
01/10/08
36.1
KC3.Pond
01/10/08
35.6
KC3.Pond
01/10/08
36.9
KC3.Pond
01/10/08
79.8
KC3.Pond
01/10/08
43.2
KC3.Pond
01/10/08
45.4
KC3.Pond
01/10/08
47.9
KC3.Pond
01/10/08
49.4
KC3.Pond
01/10/08
45.5
KC3.Pond
01/10/08
45
KC3.Pond
01/10/08
45.2
KC3.Pond
01/10/08
38.2
KC3.Pond
01/10/08
35.1
KC3.Pond
01/11/08
34.3
KC3.Pond
01/11/08
34.5
KC3.Pond
01/11/08
57.6
KC3.Pond
01/11/08
50.2
KC3.Pond
01/11/08
50.2
KC3.Pond
01/11/08
50.6
KC3.Pond
01/11/08
65.3
KC3.Pond
01/11/08
64.9
KC3.Pond
01/11/08
65.3
KC3.Pond
01/11/08
65.3
F-397

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.Pond
01/11/08
81
KC3.Pond
01/11/08
67.2
KC3.Pond
01/11/08
66.5
KC3.Pond
01/11/08
66.2
KC3.Pond
01/11/08
66.3
KC3.Pond
01/11/08
62.1
KC3.Pond
01/11/08
61.8
KC3.Pond
01/11/08
61.8
KC3.Pond
01/11/08
60.7
KC3.Pond
01/11/08
61
KC3.Pond
01/1 2/08
119.1
KC3.Pond
01/12/08
57.6
KC3.Pond
01/12/08
56.8
KC3.Pond
01/12/08
56.4
KC3.Pond
01/12/08
60.6
KC3.Pond
01/12/08
68.7
KC3.Pond
01/12/08
70.2
KC3.Pond
01/12/08
69.9
KC3.Pond
01/12/08
68.3
KC3.Pond
01/12/08
67.9
KC3.Pond
01/12/08
66.9
KC3.Pond
01/12/08
58.3
KC3.Pond
01/12/08
58.1
KC3.Pond
01/12/08
57.4
KC3.Pond
01/12/08
57.5
KC3.Pond
01/12/08
52.3
KC3.Pond
01/12/08
50.1
KC3.Pond
01/12/08
57.2
KC3.Pond
01/12/08
63.1
KC3.Pond
01/12/08
63.3
KC3.Pond
01/14/08
48.2
KC3.Pond
01/14/08
42.9
KC3.Pond
01/14/08
42.5
KC3.Pond
01/14/08
44.4
KC3.Pond
01/14/08
42.3
KC3.Pond
01/14/08
42.2
KC3.Pond
01/14/08
40.4
KC3.Pond
01/14/08
41.5
KC3.Pond
01/14/08
41.6
KC3.Pond
01/14/08
39.7
KC3.Pond
01/14/08
41.2
KC3.Pond
01/14/08
40.4
KC3.Pond
01/14/08
38.8
KC3.Pond
01/14/08
38.5
KC3.Pond
01/14/08
39.2
F-398

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
KC3.Pond
01/14/08
34.5
KC3.Pond
01/14/08
37
KC3.Pond
01/14/08
37.6
KC3.Pond
01/14/08
42.7
KC3.Pond
01/14/08
34.8
KC3.Pond
01/14/08
34.6
KC3.Pond
01/14/08
39.7
KC3.Pond
01/14/08
51.5
KC3.Pond
01/14/08
130.9
NC.Road
09/16/08
167
NC.Road
11/04/08
43
NC.Road
11/14/08
50
NC.Road
11/25/08
40
NC.Road
11/30/08
37
NC.Road
1 2/25/08
38
NC.Road
01/06/09
11
NCR.1
06/27/06
109
NCR.1
08/09/06
24
NCR.1
08/11/06
24
NCR.1
08/1 2/06
40
NCR.1
08/30/06
43
NCR.1
08/31/06
38
NCR.1
09/04/06
40
NCR.1
09/07/06
16
NCR.1
09/1 3/06
9
NCR.1
09/23/06
77
NCR.1
09/24/06
18
NCR.1
10/05/06
15
NCR.2
07/1 3/06
90
NCR.2
09/10/06
15
NCR.2
09/1 3/06
44
NY
10/02/08
999.3
NY
10/02/08
1000.9
NY
10/02/08
897.4
NY
10/02/08
886.7
NY
10/02/08
959.2
NY
10/02/08
830.2
NY
10/02/08
811.7
NY
10/02/08
939.9
NY
10/02/08
808.7
NY
10/02/08
460.7
NY
10/02/08
380.3
NY
10/02/08
880.7
NY
10/02/08
317.7
NY
10/02/08
343.9
F-399

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/02/08
145.4
NY
10/02/08
30.9
NY
10/02/08
6.5
NY
10/02/08
174.1
NY
10/02/08
451.7
NY
10/02/08
503.6
NY
10/02/08
113.5
NY
10/02/08
143.5
NY
10/03/08
112.3
NY
10/03/08
99.3
NY
10/03/08
89.3
NY
10/03/08
82.2
NY
10/03/08
72.2
NY
10/03/08
64.8
NY
10/03/08
58.9
NY
10/03/08
58.8
NY
10/03/08
78.2
NY
10/03/08
153.8
NY
10/03/08
77.3
NY
10/03/08
74.7
NY
10/03/08
75.5
NY
10/03/08
75.9
NY
10/03/08
77.4
NY
10/03/08
78
NY
10/03/08
76.4
NY
10/03/08
71.9
NY
10/03/08
62.2
NY
10/03/08
105.1
NY
10/03/08
53.2
NY
10/03/08
48.7
NY
10/03/08
85.2
NY
10/03/08
93.1
NY
10/03/08
89.2
NY
10/03/08
88.1
NY
10/03/08
85.8
NY
10/03/08
82.3
NY
10/03/08
84.6
NY
10/03/08
84.1
NY
10/03/08
81.3
NY
10/03/08
86.2
NY
10/03/08
109.6
NY
10/03/08
149.1
NY
10/03/08
232.8
NY
10/03/08
358.8
NY
10/03/08
953.5
F-400

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/03/08
941.7
NY
10/03/08
647.8
NY
10/03/08
773.1
NY
10/03/08
628.7
NY
10/03/08
304.8
NY
10/03/08
371.5
NY
10/03/08
383.7
NY
10/03/08
448.4
NY
10/03/08
550.2
NY
10/03/08
476.1
NY
10/03/08
405
NY
10/03/08
261.4
NY
10/03/08
170.9
NY
10/03/08
329.2
NY
10/03/08
692.7
NY
10/03/08
756.7
NY
10/03/08
808.5
NY
10/03/08
894.7
NY
10/03/08
962.3
NY
10/03/08
990.7
NY
10/04/08
63.1
NY
10/04/08
57.6
NY
10/04/08
56.2
NY
10/04/08
46.3
NY
10/04/08
44.2
NY
10/04/08
66.1
NY
10/04/08
59.4
NY
10/04/08
80.2
NY
10/04/08
297
NY
10/04/08
194.4
NY
10/04/08
84.2
NY
10/04/08
205.6
NY
10/04/08
104.1
NY
10/04/08
124.6
NY
10/04/08
185.8
NY
10/04/08
101.8
NY
10/04/08
100
NY
10/04/08
104.8
NY
10/04/08
113.2
NY
10/04/08
108.2
NY
10/04/08
110.3
NY
10/04/08
100.9
NY
10/04/08
75.9
NY
10/04/08
80
NY
10/04/08
62.8
F-401

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/04/08
171.4
NY
10/04/08
99.6
NY
10/04/08
102.7
NY
10/04/08
109.3
NY
10/04/08
104.7
NY
10/04/08
105.4
NY
10/04/08
100.4
NY
10/04/08
99.6
NY
10/04/08
91.2
NY
10/04/08
89.3
NY
10/04/08
121.2
NY
10/04/08
115.1
NY
10/04/08
225.7
NY
10/04/08
198.9
NY
10/04/08
206.7
NY
10/04/08
241.9
NY
10/04/08
444.6
NY
10/04/08
163.1
NY
10/04/08
61.3
NY
10/04/08
185.7
NY
10/06/08
87.7
NY
10/06/08
77
NY
10/06/08
72
NY
10/06/08
68.8
NY
10/06/08
88.5
NY
10/06/08
117.3
NY
10/06/08
107.2
NY
10/06/08
101
NY
10/06/08
93.3
NY
10/06/08
70.6
NY
10/06/08
157.3
NY
10/06/08
111.1
NY
10/06/08
117
NY
10/06/08
156.4
NY
10/06/08
136.5
NY
10/06/08
135.7
NY
10/06/08
237.2
NY
10/06/08
153.7
NY
10/06/08
128.4
NY
10/07/08
42.5
NY
10/07/08
36.9
NY
10/07/08
32.7
NY
10/07/08
33.4
NY
10/07/08
29.7
NY
10/07/08
33.4
F-402

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/07/08
39.3
NY
10/07/08
35.6
NY
10/07/08
59.1
NY
10/07/08
59.3
NY
10/07/08
58.7
NY
10/07/08
70.1
NY
10/07/08
51.9
NY
10/07/08
51.8
NY
10/07/08
48.3
NY
10/07/08
43.9
NY
10/07/08
48.3
NY
10/07/08
46.1
NY
10/07/08
49.8
NY
10/07/08
53
NY
10/07/08
61.2
NY
10/07/08
68.1
NY
10/07/08
68.7
NY
10/07/08
106.4
NY
10/07/08
380.1
NY
10/07/08
75.5
NY
10/07/08
68.9
NY
10/07/08
69.7
NY
10/07/08
65.9
NY
10/07/08
63.3
NY
10/07/08
54.1
NY
10/07/08
71.7
NY
10/07/08
68.6
NY
10/07/08
69
NY
10/07/08
64.7
NY
10/07/08
59
NY
10/07/08
63.2
NY
10/07/08
139.8
NY
10/07/08
172.1
NY
10/07/08
118.3
NY
10/07/08
64.4
NY
10/07/08
60.4
NY
10/07/08
75.7
NY
10/07/08
59.3
NY
10/07/08
60
NY
10/07/08
55.6
NY
10/07/08
52.9
NY
10/07/08
51.9
NY
10/07/08
49.7
NY
10/07/08
88.9
NY
10/07/08
84.9
F-403

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/07/08
82.2
NY
10/07/08
81.2
NY
10/07/08
85.9
NY
10/08/08
98
NY
10/08/08
92.6
NY
10/08/08
76.3
NY
10/08/08
58.1
NY
10/08/08
45.8
NY
10/08/08
50.6
NY
10/08/08
99.5
NY
10/08/08
90.6
NY
10/08/08
104.3
NY
10/08/08
136.6
NY
10/08/08
111.9
NY
10/08/08
98
NY
10/08/08
85
NY
10/08/08
64.4
NY
10/08/08
75
NY
10/08/08
109.9
NY
10/08/08
117.9
NY
10/08/08
117.6
NY
10/08/08
124.3
NY
10/08/08
124.6
NY
10/08/08
97.7
NY
10/08/08
48
NY
10/08/08
44.7
NY
10/08/08
66.5
NY
10/08/08
61.4
NY
10/08/08
61
NY
10/08/08
63.6
NY
10/08/08
56.2
NY
10/08/08
53.7
NY
10/08/08
52.6
NY
10/08/08
48.6
NY
10/08/08
50.5
NY
10/08/08
58.5
NY
10/08/08
99.7
NY
10/08/08
51.9
NY
10/08/08
45.3
NY
10/08/08
42.5
NY
10/08/08
40.1
NY
10/08/08
104.6
NY
10/08/08
75.4
NY
10/08/08
69.1
NY
10/08/08
36.5
F-404

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/08/08
35.4
NY
10/08/08
35.4
NY
10/08/08
34
NY
10/08/08
33.6
NY
10/08/08
47.8
NY
10/09/08
114.2
NY
10/09/08
130.8
NY
10/09/08
82.2
NY
10/09/08
58.3
NY
10/09/08
56.6
NY
10/09/08
82.8
NY
10/09/08
70.2
NY
10/09/08
61.9
NY
10/09/08
59
NY
10/09/08
58.2
NY
10/09/08
88.4
NY
10/09/08
67.3
NY
10/09/08
77.6
NY
10/09/08
139.4
NY
10/09/08
86
NY
10/09/08
81.5
NY
10/09/08
76.2
NY
10/09/08
72.1
NY
10/09/08
68.6
NY
10/09/08
68.7
NY
10/09/08
67
NY
10/09/08
78.8
NY
10/09/08
90.5
NY
10/09/08
68.2
NY
10/09/08
31.1
NY
10/09/08
106.7
NY
10/09/08
66.7
NY
10/09/08
64.1
NY
10/09/08
60.2
NY
10/09/08
61
NY
10/09/08
55.5
NY
10/09/08
51.7
NY
10/09/08
62.4
NY
10/09/08
81.4
NY
10/09/08
67.1
NY
10/09/08
54.6
NY
10/09/08
45.6
NY
10/09/08
44.4
NY
10/09/08
72.5
NY
10/09/08
631.4
F-405

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/10/08
58.4
NY
10/10/08
48
NY
10/10/08
37.2
NY
10/10/08
30.9
NY
10/10/08
40.1
NY
10/10/08
40.9
NY
10/10/08
56.4
NY
10/10/08
49.8
NY
10/10/08
45.9
NY
10/10/08
47.3
NY
10/10/08
43.4
NY
10/10/08
105.3
NY
10/10/08
25.8
NY
10/10/08
30.1
NY
10/10/08
32.3
NY
10/10/08
128.7
NY
10/10/08
77.6
NY
10/10/08
71.1
NY
10/10/08
62.5
NY
10/10/08
55.6
NY
10/10/08
47.5
NY
10/10/08
53.2
NY
10/10/08
70.7
NY
10/10/08
61.4
NY
10/10/08
55.5
NY
10/10/08
45.9
NY
10/10/08
47.1
NY
10/11/08
75.4
NY
10/11/08
64
NY
10/11/08
59.8
NY
10/11/08
61.7
NY
10/11/08
67.6
NY
10/11/08
50.4
NY
10/11/08
34
NY
10/11/08
82.7
NY
10/11/08
79.6
NY
10/11/08
88.2
NY
10/11/08
80.8
NY
10/11/08
114.1
NY
10/11/08
100.2
NY
10/11/08
103.3
NY
10/11/08
95
NY
10/11/08
78.4
NY
10/11/08
55.8
NY
10/11/08
48.1
F-406

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/11/08
70.4
NY
10/11/08
89.5
NY
10/11/08
55.4
NY
10/11/08
54.4
NY
10/11/08
50.3
NY
10/11/08
61.1
NY
10/11/08
50
NY
10/11/08
47.2
NY
10/11/08
42.1
NY
10/11/08
39.5
NY
10/11/08
38.7
NY
10/11/08
89.4
NY
10/11/08
79.1
NY
10/11/08
70.2
NY
10/11/08
47.9
NY
10/11/08
45.3
NY
10/11/08
40.8
NY
10/1 2/08
65
NY
10/1 2/08
54.9
NY
10/1 2/08
52.3
NY
10/1 2/08
51.4
NY
10/1 2/08
48.4
NY
10/1 2/08
45.8
NY
10/1 2/08
67.4
NY
10/1 2/08
55.9
NY
10/1 2/08
83.3
NY
10/1 2/08
86.1
NY
10/1 2/08
67.2
NY
10/1 2/08
64.2
NY
10/1 2/08
87
NY
10/1 2/08
81
NY
10/1 2/08
105.8
NY
10/1 2/08
90.6
NY
10/1 2/08
62.6
NY
10/1 2/08
57.4
NY
10/1 2/08
147.4
NY
10/1 2/08
74.1
NY
10/1 2/08
69.6
NY
10/1 2/08
66.2
NY
10/1 2/08
64.8
NY
10/1 2/08
102.5
NY
10/1 2/08
72.8
NY
10/1 2/08
126
NY
10/1 2/08
77.5
NY
10/1 2/08
71.6
F-407

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/1 2/08
68.8
NY
10/1 2/08
68.1
NY
10/1 2/08
68.7
NY
10/1 2/08
71.4
NY
10/1 2/08
12.4
NY
10/1 3/08
51.1
NY
10/1 3/08
47.6
NY
10/1 3/08
56.8
NY
10/1 3/08
130
NY
10/1 3/08
79.2
NY
10/1 3/08
82.2
NY
10/1 3/08
78.1
NY
10/1 3/08
74.6
NY
10/1 3/08
82.8
NY
10/1 3/08
105.4
NY
10/1 3/08
78.3
NY
10/1 3/08
71
NY
10/1 3/08
68.8
NY
10/1 3/08
63.7
NY
10/1 3/08
63.5
NY
10/1 3/08
66.1
NY
10/1 3/08
87.5
NY
10/1 3/08
58.8
NY
10/1 3/08
56
NY
10/1 3/08
53.6
NY
10/1 3/08
52.8
NY
10/1 3/08
64.3
NY
10/1 3/08
49.1
NY
10/1 3/08
61.2
NY
10/1 3/08
54.7
NY
10/1 3/08
50.6
NY
10/1 3/08
44.3
NY
10/1 3/08
43.3
NY
10/1 3/08
60
NY
10/14/08
120.4
NY
10/14/08
95.1
NY
10/14/08
82.1
NY
10/14/08
74.2
NY
10/14/08
65.8
NY
10/14/08
66
NY
10/14/08
75.5
NY
10/14/08
90.1
NY
10/14/08
81.1
NY
10/14/08
72.5
NY
10/14/08
66.9
F-408

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/14/08
81.1
NY
10/14/08
69.4
NY
10/14/08
69.3
NY
10/14/08
77.6
NY
10/14/08
120.8
NY
10/14/08
65.8
NY
10/14/08
66.7
NY
10/14/08
58
NY
10/14/08
53.4
NY
10/14/08
48.3
NY
10/14/08
47.6
NY
10/14/08
51.4
NY
10/14/08
56
NY
10/14/08
37.1
NY
10/14/08
59.2
NY
10/14/08
56.8
NY
10/14/08
53.4
NY
10/14/08
51.7
NY
10/14/08
52.6
NY
10/15/08
305.4
NY
10/15/08
185.8
NY
10/15/08
155.1
NY
10/15/08
143.3
NY
10/15/08
142.7
NY
10/15/08
133.9
NY
10/15/08
128.1
NY
10/15/08
123.4
NY
10/15/08
105
NY
10/15/08
111.9
NY
10/15/08
105
NY
10/15/08
92.4
NY
10/15/08
CO
CO
CO
NY
10/15/08
93.1
NY
10/15/08
72.7
NY
10/15/08
115.7
NY
10/15/08
100.3
NY
10/15/08
91.2
NY
10/15/08
87.7
NY
10/15/08
76.9
NY
10/15/08
70.3
NY
10/15/08
86.4
NY
10/15/08
79.1
NY
10/15/08
56.7
NY
10/15/08
97
NY
10/15/08
93.1
F-409

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/15/08
81.3
NY
10/15/08
72.3
NY
10/15/08
68
NY
10/15/08
85.1
NY
10/16/08
142
NY
10/16/08
138.6
NY
10/16/08
135.9
NY
10/16/08
135.7
NY
10/16/08
136.2
NY
10/16/08
134
NY
10/16/08
133.4
NY
10/16/08
132.4
NY
10/16/08
129.1
NY
10/16/08
134
NY
10/16/08
177.5
NY
10/16/08
162.8
NY
10/16/08
187.2
NY
10/1 7/08
175.1
NY
10/1 7/08
186.6
NY
10/1 7/08
176.4
NY
10/1 7/08
181.4
NY
10/1 7/08
174.7
NY
10/1 7/08
170.8
NY
10/1 7/08
210.8
NY
10/1 7/08
316.5
NY
10/1 7/08
169.3
NY
10/1 7/08
172.4
NY
10/1 7/08
169.6
NY
10/1 7/08
169.7
NY
10/1 7/08
164.8
NY
10/1 7/08
169.4
NY
10/1 7/08
178.1
NY
10/1 7/08
165.8
NY
10/1 7/08
158.9
NY
10/1 7/08
158.6
NY
10/1 7/08
146.7
NY
10/1 7/08
140.6
NY
10/1 7/08
124.2
NY
10/1 7/08
118.4
NY
10/1 7/08
109.1
NY
10/1 7/08
105.1
NY
10/1 7/08
99.3
NY
10/1 7/08
100.5
NY
10/1 7/08
105.6
NY
10/1 7/08
90.9
F-410

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/1 7/08
84.4
NY
10/1 7/08
81.9
NY
10/1 7/08
114.7
NY
10/1 7/08
83.6
NY
10/1 7/08
89.9
NY
10/1 7/08
127.9
NY
10/1 7/08
79.9
NY
10/1 7/08
79.8
NY
10/1 7/08
75.6
NY
10/1 7/08
75.8
NY
10/1 7/08
74.3
NY
10/1 7/08
73.7
NY
10/1 7/08
68.1
NY
10/1 7/08
73.9
NY
10/1 7/08
71.5
NY
10/1 7/08
317.7
NY
10/1 7/08
172.4
NY
10/1 7/08
64.1
NY
10/1 7/08
161.3
NY
10/1 7/08
112.1
NY
10/1 7/08
112.7
NY
10/1 7/08
112.5
NY
10/1 7/08
128.8
NY
10/18/08
122.4
NY
10/18/08
114
NY
10/18/08
113.8
NY
10/18/08
112.1
NY
10/18/08
111.9
NY
10/18/08
111.7
NY
10/18/08
110.7
NY
10/18/08
111.2
NY
10/18/08
128.3
NY
10/18/08
107.4
NY
10/18/08
116
NY
10/18/08
114.4
NY
10/18/08
114.9
NY
10/18/08
114.2
NY
10/18/08
113.8
NY
10/18/08
122.2
NY
10/18/08
127.2
NY
10/18/08
110
NY
10/18/08
110.3
NY
10/18/08
110.6
NY
10/18/08
110.5
NY
10/18/08
109
F-411

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/19/08
50.4
NY
10/19/08
43.8
NY
10/19/08
44.4
NY
10/19/08
48
NY
10/19/08
49.6
NY
10/19/08
52.6
NY
10/19/08
40.1
NY
10/19/08
134.3
NY
10/19/08
126.5
NY
10/19/08
124.9
NY
10/19/08
123.1
NY
10/19/08
122.1
NY
10/19/08
119.9
NY
10/19/08
119.5
NY
10/19/08
118.5
NY
10/19/08
116.8
NY
10/19/08
116.5
NY
10/19/08
116.1
NY
10/19/08
108.2
NY
10/19/08
108.2
NY
10/19/08
108.5
NY
10/19/08
108.7
NY
10/19/08
108.7
NY
10/19/08
108.8
NY
10/19/08
109.2
NY
10/19/08
109.2
NY
10/19/08
109.3
NY
10/20/08
74.2
NY
10/20/08
68.7
NY
10/20/08
61.7
NY
10/20/08
57.6
NY
10/20/08
49.4
NY
10/20/08
19
NY
10/20/08
54
NY
10/20/08
50.9
NY
10/20/08
45.3
NY
10/20/08
42.2
NY
10/20/08
39.7
NY
10/20/08
41.8
NY
10/20/08
40.2
NY
10/20/08
68.3
NY
10/20/08
83.8
NY
10/20/08
26.8
NY
10/20/08
32.3
NY
10/20/08
39.3
F-412

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/20/08
56.8
NY
10/20/08
87.2
NY
10/20/08
8.9
NY
10/20/08
9.3
NY
10/20/08
9.5
NY
10/20/08
8.9
NY
10/20/08
9.2
NY
10/21/08
27.7
NY
10/21/08
27.8
NY
10/21/08
29.2
NY
10/21/08
28.7
NY
10/21/08
27.6
NY
10/21/08
27.2
NY
10/21/08
28.8
NY
10/21/08
30.5
NY
10/21/08
28.9
NY
10/21/08
30.1
NY
10/21/08
32.6
NY
10/21/08
33.8
NY
10/21/08
36.9
NY
10/21/08
59.7
NY
10/21/08
43
NY
10/21/08
38.9
NY
10/21/08
41.5
NY
10/21/08
42.3
NY
10/21/08
44.5
NY
10/21/08
50.7
NY
10/21/08
74.4
NY
10/21/08
67.4
NY
10/21/08
44.7
NY
10/21/08
42.2
NY
10/21/08
46.5
NY
10/21/08
51.4
NY
10/21/08
54.2
NY
10/21/08
53.9
NY
10/21/08
56.1
NY
10/21/08
57.4
NY
10/21/08
56.5
NY
10/21/08
58.4
NY
10/21/08
61.9
NY
10/21/08
61.2
NY
10/21/08
69.7
NY
10/21/08
61.1
NY
10/21/08
54.1
NY
10/21/08
49.7
F-413

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/21/08
46.1
NY
10/21/08
41.5
NY
10/21/08
39.4
NY
10/21/08
37.2
NY
10/21/08
36.7
NY
10/21/08
36.5
NY
10/21/08
37.1
NY
10/21/08
35.7
NY
10/21/08
33.7
NY
10/21/08
34.7
NY
10/21/08
46.2
NY
10/22/08
33.5
NY
10/22/08
30.8
NY
10/22/08
29.8
NY
10/22/08
27.8
NY
10/22/08
30.2
NY
10/22/08
37.3
NY
10/22/08
24.8
NY
10/22/08
22.7
NY
10/22/08
21.9
NY
10/22/08
22.5
NY
10/22/08
22
NY
10/22/08
22.2
NY
10/22/08
22.5
NY
10/22/08
23.1
NY
10/22/08
24.7
NY
10/22/08
28.8
NY
10/22/08
37.1
NY
10/22/08
24.7
NY
10/22/08
25
NY
10/22/08
25.8
NY
10/22/08
35.4
NY
10/22/08
25.7
NY
10/22/08
26
NY
10/22/08
26.3
NY
10/22/08
27.3
NY
10/22/08
26.8
NY
10/23/08
69.2
NY
10/23/08
68.8
NY
10/23/08
69.8
NY
10/23/08
67.7
NY
10/23/08
71.2
NY
10/23/08
77.7
NY
10/23/08
80.5
NY
10/23/08
71.2
F-414

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/23/08
65.1
NY
10/23/08
66.6
NY
10/23/08
66.2
NY
10/23/08
55.9
NY
10/23/08
61.7
NY
10/23/08
57.8
NY
10/23/08
54.2
NY
10/23/08
50
NY
10/23/08
45.8
NY
10/23/08
46.2
NY
10/23/08
43
NY
10/23/08
45
NY
10/23/08
41.4
NY
10/23/08
40.7
NY
10/23/08
37.3
NY
10/23/08
36.9
NY
10/23/08
33.6
NY
10/23/08
33.1
NY
10/23/08
34.7
NY
10/24/08
103.2
NY
10/24/08
97
NY
10/24/08
85.1
NY
10/24/08
84.1
NY
10/24/08
70.4
NY
10/24/08
83.6
NY
10/24/08
104.1
NY
10/24/08
90.1
NY
10/24/08
84.9
NY
10/24/08
70.6
NY
10/24/08
74.8
NY
10/24/08
92.5
NY
10/24/08
60.1
NY
10/24/08
60.8
NY
10/24/08
54.4
NY
10/24/08
53.3
NY
10/24/08
49.6
NY
10/24/08
47.8
NY
10/24/08
44.1
NY
10/24/08
45.2
NY
10/24/08
47.7
NY
10/24/08
34.9
NY
10/24/08
42.6
NY
10/24/08
37.5
NY
10/24/08
35.4
NY
10/24/08
33.5
F-415

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/24/08
32.6
NY
10/24/08
32.4
NY
10/24/08
34
NY
10/24/08
35
NY
10/24/08
36.1
NY
10/24/08
36
NY
10/24/08
35
NY
10/24/08
50.4
NY
10/25/08
121.5
NY
10/25/08
97.1
NY
10/25/08
106.9
NY
10/25/08
108.3
NY
10/25/08
122
NY
10/25/08
125.2
NY
10/25/08
145.4
NY
10/25/08
152.1
NY
10/25/08
168
NY
10/25/08
150.5
NY
10/25/08
71.5
NY
10/25/08
103.3
NY
10/25/08
221.3
NY
10/25/08
174.8
NY
10/25/08
138.1
NY
10/25/08
138.4
NY
10/25/08
128.4
NY
10/25/08
129.8
NY
10/25/08
108.1
NY
10/25/08
104.8
NY
10/25/08
112.4
NY
10/25/08
100.3
NY
10/25/08
82.4
NY
10/25/08
85.6
NY
10/25/08
75.7
NY
10/25/08
80.3
NY
10/25/08
73.7
NY
10/25/08
81.7
NY
10/25/08
85.2
NY
10/25/08
54.4
NY
10/25/08
91.2
NY
10/25/08
82.6
NY
10/25/08
87.2
NY
10/25/08
80.4
NY
10/25/08
85.9
NY
10/25/08
121.7
NY
10/25/08
113.6
F-416

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/25/08
69.6
NY
10/25/08
66.6
NY
10/25/08
54.7
NY
10/25/08
48.5
NY
10/25/08
56.3
NY
10/25/08
47
NY
10/25/08
69.1
NY
10/25/08
50.7
NY
10/26/08
47.6
NY
10/26/08
43.8
NY
10/26/08
60.3
NY
10/26/08
91
NY
10/26/08
78.4
NY
10/26/08
77.6
NY
10/26/08
72.9
NY
10/26/08
71.7
NY
10/26/08
69.6
NY
10/26/08
71.6
NY
10/26/08
76.1
NY
10/26/08
86.1
NY
10/26/08
105
NY
10/26/08
97.9
NY
10/26/08
92
NY
10/26/08
86.5
NY
10/26/08
90.1
NY
10/26/08
96
NY
10/26/08
86.2
NY
10/26/08
84.9
NY
10/26/08
79
NY
10/26/08
75.5
NY
10/26/08
66.9
NY
10/26/08
60.6
NY
10/26/08
53.1
NY
10/26/08
48.3
NY
10/26/08
49.3
NY
10/26/08
55.3
NY
10/26/08
9.3
NY
10/26/08
140.4
NY
10/26/08
83.9
NY
10/26/08
84.1
NY
10/26/08
78.6
NY
10/26/08
78.6
NY
10/26/08
74.8
NY
10/26/08
78.7
NY
10/26/08
81.8
F-417

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/26/08
58.6
NY
10/26/08
71.8
NY
10/26/08
84.8
NY
10/27/08
78.4
NY
10/27/08
77.8
NY
10/27/08
71.3
NY
10/27/08
68.2
NY
10/27/08
64.7
NY
10/27/08
63.6
NY
10/27/08
60.4
NY
10/27/08
56.6
NY
10/27/08
52
NY
10/28/08
232.3
NY
10/28/08
258.1
NY
10/28/08
267.4
NY
10/28/08
230.6
NY
10/28/08
83
NY
10/28/08
125
NY
10/28/08
258
NY
10/28/08
179.9
NY
10/28/08
141.7
NY
10/28/08
147.3
NY
10/28/08
148.4
NY
10/28/08
154.5
NY
10/28/08
151.8
NY
10/28/08
141.2
NY
10/28/08
127.6
NY
10/28/08
107.3
NY
10/29/08
86.4
NY
10/29/08
84.4
NY
10/29/08
80.6
NY
10/29/08
76
NY
10/29/08
73
NY
10/29/08
68.9
NY
10/29/08
66.5
NY
10/29/08
153.5
NY
10/29/08
70.5
NY
10/29/08
83.1
NY
10/29/08
169.1
NY
10/29/08
78.9
NY
10/29/08
110.3
NY
10/29/08
78.6
NY
10/29/08
107.9
NY
10/29/08
81
NY
10/29/08
115.7
F-418

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/29/08
87.1
NY
10/29/08
124.3
NY
10/29/08
107.2
NY
10/29/08
145.5
NY
10/29/08
107.5
NY
10/29/08
137.8
NY
10/29/08
109
NY
10/29/08
144.7
NY
10/29/08
109.6
NY
10/29/08
130.8
NY
10/29/08
82.3
NY
10/29/08
126.3
NY
10/29/08
73.5
NY
10/29/08
116.4
NY
10/29/08
54.6
NY
10/29/08
139.9
NY
10/29/08
121.2
NY
10/29/08
117.5
NY
10/29/08
121.1
NY
10/29/08
120.2
NY
10/29/08
111.9
NY
10/29/08
103.2
NY
10/29/08
105.5
NY
10/29/08
94.9
NY
10/29/08
168
NY
10/30/08
98.8
NY
10/30/08
96.1
NY
10/30/08
92.8
NY
10/30/08
90.7
NY
10/30/08
88.6
NY
10/30/08
86.2
NY
10/30/08
82.9
NY
10/30/08
81.1
NY
10/30/08
77.7
NY
10/30/08
77.9
NY
10/30/08
72.1
NY
10/30/08
69.1
NY
10/30/08
181
NY
10/30/08
98.7
NY
10/30/08
110.1
NY
10/30/08
100.9
NY
10/30/08
100.2
NY
10/30/08
102
NY
10/30/08
105.8
NY
10/30/08
110.1
F-419

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/30/08
103.9
NY
10/30/08
104.4
NY
10/30/08
105.9
NY
10/30/08
105.2
NY
10/30/08
109.1
NY
10/30/08
99.9
NY
10/30/08
97.3
NY
10/30/08
92.9
NY
10/30/08
89.2
NY
10/30/08
85
NY
10/30/08
81.3
NY
10/30/08
78.7
NY
10/30/08
76.1
NY
10/30/08
71.7
NY
10/30/08
94
NY
10/30/08
42.4
NY
10/30/08
43.6
NY
10/30/08
47.5
NY
10/30/08
48.2
NY
10/30/08
96.2
NY
10/30/08
89.8
NY
10/30/08
90.4
NY
10/30/08
87.3
NY
10/31/08
114
NY
10/31/08
109.8
NY
10/31/08
110.1
NY
10/31/08
106.5
NY
10/31/08
106.2
NY
10/31/08
101.5
NY
10/31/08
101.1
NY
10/31/08
96.3
NY
10/31/08
95
NY
10/31/08
89.6
NY
10/31/08
86
NY
10/31/08
82.3
NY
10/31/08
83
NY
10/31/08
104.3
NY
10/31/08
96.6
NY
10/31/08
96.3
NY
10/31/08
95.9
NY
10/31/08
96
NY
10/31/08
95.7
NY
10/31/08
95.4
NY
10/31/08
95.3
NY
10/31/08
93.3
F-420

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
10/31/08
90.2
NY
10/31/08
87.6
NY
10/31/08
79.7
NY
10/31/08
73.6
NY
10/31/08
72.4
NY
10/31/08
156.4
NY
10/31/08
135.7
NY
10/31/08
101.6
NY
11/01/08
102.7
NY
11/01/08
98.5
NY
11/01/08
96.8
NY
11/01/08
94.4
NY
11/01/08
91.8
NY
11/01/08
89.3
NY
11/01/08
88.4
NY
11/01/08
85.6
NY
11/01/08
80.4
NY
11/01/08
76.4
NY
11/01/08
77
NY
11/01/08
206.8
NY
11/01/08
235.1
NY
11/01/08
214.2
NY
11/01/08
212.7
NY
11/01/08
212.6
NY
11/01/08
210.8
NY
11/01/08
210.6
NY
11/01/08
207.2
NY
11/01/08
204.8
NY
11/01/08
195.9
NY
11/01/08
187.6
NY
11/01/08
180.2
NY
11/01/08
154.1
NY
11/01/08
135.1
NY
11/01/08
116.2
NY
11/01/08
106.5
NY
11/01/08
102
NY
11/01/08
100.1
NY
11/01/08
98.2
NY
11/01/08
97.8
NY
11/01/08
130.1
NY
11/02/08
154
NY
11/02/08
140.8
NY
11/02/08
138.8
NY
11/02/08
134.2
NY
11/02/08
134.6
F-421

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
11/02/08
131.7
NY
11/02/08
131.3
NY
11/02/08
126.4
NY
11/02/08
123.5
NY
11/02/08
117.2
NY
11/02/08
113.9
NY
11/02/08
114.6
NY
11/02/08
110.9
NY
11/02/08
108.1
NY
11/02/08
111.2
NY
11/02/08
64.7
NY
11/02/08
64.8
NY
11/02/08
65
NY
11/02/08
65.8
NY
11/02/08
66.6
NY
11/02/08
66.7
NY
11/02/08
66.9
NY
11/02/08
67.2
NY
11/02/08
67.3
NY
11/02/08
67.8
NY
11/02/08
68.3
NY
11/02/08
68.9
NY
11/02/08
69
NY
11/02/08
69.2
NY
11/03/08
186.4
NY
11/03/08
181.5
NY
11/03/08
177.3
NY
11/03/08
174.5
NY
11/03/08
186.8
NY
11/03/08
169.3
NY
11/03/08
164.3
NY
11/03/08
158
NY
11/03/08
159.3
NY
11/03/08
187.7
NY
11/03/08
181.6
NY
11/03/08
183.2
NY
11/03/08
177.7
NY
11/03/08
177.8
NY
11/03/08
174.6
NY
11/03/08
174.8
NY
11/03/08
171
NY
11/03/08
169.5
NY
11/03/08
164.9
NY
11/03/08
161.2
NY
11/03/08
157.7
F-422

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
11/03/08
154.7
NY
11/03/08
154.1
NY
11/03/08
144.1
NY
11/03/08
140
NY
11/03/08
136.3
NY
11/03/08
132.4
NY
11/03/08
139.7
NY
11/03/08
155
NY
11/03/08
138.4
NY
11/03/08
134.7
NY
11/03/08
128.6
NY
11/03/08
123.2
NY
11/03/08
118.6
NY
11/03/08
114.6
NY
11/03/08
110
NY
11/03/08
117.3
NY
11/04/08
231.9
NY
11/04/08
210.2
NY
11/04/08
208
NY
11/04/08
204.8
NY
11/04/08
201.3
NY
11/04/08
197.5
NY
11/04/08
193.4
NY
11/04/08
195
NY
11/04/08
195.8
NY
11/04/08
215.4
NY
11/04/08
203.3
NY
11/04/08
199.8
NY
11/04/08
197.2
NY
11/04/08
194.2
NY
11/04/08
191.2
NY
11/04/08
187.8
NY
11/04/08
185.1
NY
11/04/08
181.1
NY
11/04/08
180.7
NY
11/04/08
175.9
NY
11/05/08
247.1
NY
11/05/08
158.7
NY
11/05/08
154.6
NY
11/05/08
151.6
NY
11/05/08
147.6
NY
11/05/08
138
NY
11/05/08
137.5
NY
11/05/08
127.9
NY
11/05/08
127.8
F-423

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
11/05/08
116.5
NY
11/05/08
115.6
NY
11/05/08
104.4
NY
11/05/08
103.9
NY
11/05/08
92.3
NY
11/05/08
87.9
NY
11/05/08
83.9
NY
11/05/08
82.4
NY
11/05/08
123.7
NY
11/05/08
218
NY
11/05/08
213.6
NY
11/05/08
212.3
NY
11/05/08
211.4
NY
11/05/08
210
NY
11/05/08
208.7
NY
11/05/08
205.7
NY
11/05/08
205.3
NY
11/05/08
202.9
NY
11/05/08
201.4
NY
11/05/08
207.7
NY
11/06/08
56
NY
11/06/08
60.3
NY
11/06/08
49.7
NY
11/06/08
33.5
NY
11/06/08
36.9
NY
11/06/08
48.8
NY
11/06/08
50.2
NY
11/06/08
24
NY
11/06/08
38.5
NY
11/06/08
38.6
NY
11/06/08
207.1
NY
11/06/08
205.1
NY
11/06/08
194.7
NY
11/06/08
194.6
NY
11/06/08
195.3
NY
11/06/08
209.9
NY
11/06/08
195.1
NY
11/06/08
195.4
NY
11/06/08
192.6
NY
11/06/08
192.5
NY
11/06/08
192.3
NY
11/06/08
202.1
NY
11/06/08
232.3
NY
11/06/08
195.2
NY
11/06/08
195.2
F-424

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
11/06/08
189.7
NY
11/06/08
188.7
NY
11/06/08
182.9
NY
11/06/08
181.6
NY
11/06/08
175.4
NY
11/06/08
174.6
NY
11/06/08
168
NY
11/06/08
165.3
NY
11/06/08
161.4
NY
11/06/08
208.7
NY
11/07/08
82.2
NY
11/07/08
75.3
NY
11/07/08
62.7
NY
11/07/08
56.5
NY
11/07/08
45.2
NY
11/07/08
43.5
NY
11/07/08
35.1
NY
11/07/08
34.7
NY
11/07/08
32.4
NY
11/07/08
65.4
NY
11/07/08
155.8
NY
11/07/08
197.1
NY
11/07/08
52.9
NY
11/07/08
90.9
NY
11/07/08
83.5
NY
11/07/08
115.7
NY
11/07/08
91.9
NY
11/07/08
75.4
NY
11/07/08
53.8
NY
11/07/08
56.7
NY
11/07/08
44.6
NY
11/07/08
45.2
NY
11/07/08
36.9
NY
11/07/08
39.1
NY
11/07/08
33
NY
11/07/08
73.3
NY
11/07/08
34
NY
11/07/08
43
NY
11/07/08
42
NY
11/07/08
60
NY
11/07/08
61.2
NY
11/08/08
41
NY
11/19/08
60.6
NY
11/24/08
14.5
NY
11/30/08
14.1
F-425

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
12/01/08
63.4
NY
12/01/08
123.5
NY
12/01/08
150.5
NY
12/01/08
136.4
NY
12/01/08
144.6
NY
12/01/08
62.4
NY
1 2/03/08
6.1
NY
1 2/03/08
6.1
NY
1 2/03/08
6.1
NY
1 2/03/08
6.1
NY
1 2/03/08
6.1
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6.4
NY
1 2/03/08
6.9
NY
1 2/03/08
7
NY
1 2/03/08
7
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/03/08
6
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
F-426

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.2
NY
1 2/04/08
6.2
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
F-427

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/04/08
6.1
NY
1 2/05/08
5.5
NY
1 2/05/08
5.5
NY
1 2/05/08
5.5
NY
1 2/05/08
5.5
NY
1 2/05/08
5.5
NY
1 2/05/08
5.5
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
F-428

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.6
NY
1 2/05/08
5.7
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
F-429

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.1
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.1
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.1
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/05/08
6.2
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
F-430

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.6
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.7
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.6
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
F-431

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
NY
1 2/06/08
5.5
F-432

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/07/08
5.5
NY
1 2/07/08
5.5
NY
1 2/07/08
5.5
NY
1 2/07/08
5.5
NY
1 2/07/08
5.5
NY
1 2/07/08
5.5
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.6
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
NY
1 2/07/08
5.7
F-433

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
1 2/07/08
5.7
NY
03/27/09
35.2
NY
03/27/09
707.7
NY
03/27/09
139.5
NY
03/27/09
4.1
NY
03/28/09
5
NY
03/28/09
5.1
NY
03/28/09
5.8
NY
03/28/09
5.9
NY
03/28/09
5.7
NY
03/28/09
5.3
NY
03/29/09
5.4
NY
03/29/09
5.8
NY
03/29/09
5.9
NY
03/29/09
6.4
NY
03/29/09
6.2
NY
03/29/09
6.5
NY
03/29/09
10.5
NY
03/30/09
120
NY
03/30/09
130.8
NY
03/30/09
128.6
NY
03/30/09
114.9
NY
03/30/09
129.1
NY
03/30/09
201.9
NY
03/30/09
148.5
NY
03/30/09
135
NY
03/30/09
119.9
NY
03/30/09
107
NY
03/30/09
110.9
NY
03/30/09
129.2
NY
03/30/09
102.3
NY
03/30/09
101
NY
03/30/09
114.5
NY
03/30/09
106.9
NY
03/30/09
110.8
NY
03/30/09
117.4
NY
03/30/09
112.1
NY
03/30/09
113.2
NY
03/30/09
158.5
NY
03/30/09
105.9
NY
03/30/09
105.3
NY
03/30/09
172.2
NY
03/30/09
190.3
NY
03/30/09
161.5
NY
03/30/09
98.4
F-434

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
03/30/09
105.9
NY
03/30/09
112.1
NY
03/30/09
116.3
NY
03/30/09
111.2
NY
03/30/09
117.6
NY
03/30/09
119.1
NY
03/30/09
131.1
NY
03/30/09
79
NY
03/30/09
5.3
NY
03/30/09
3.7
NY
03/31/09
46.2
NY
03/31/09
49.4
NY
03/31/09
57.7
NY
03/31/09
65.6
NY
03/31/09
72.7
NY
03/31/09
111.6
NY
03/31/09
81.9
NY
03/31/09
87.2
NY
03/31/09
92.5
NY
03/31/09
81.1
NY
03/31/09
85.8
NY
03/31/09
97.1
NY
03/31/09
72.4
NY
03/31/09
74
NY
03/31/09
79.9
NY
03/31/09
77.4
NY
03/31/09
101.9
NY
03/31/09
119.7
NY
03/31/09
120.8
NY
03/31/09
118.1
NY
03/31/09
91.2
NY
03/31/09
98
NY
03/31/09
107.8
NY
03/31/09
92.4
NY
03/31/09
96.5
NY
03/31/09
94.6
NY
03/31/09
99.5
NY
03/31/09
58.5
NY
03/31/09
52.4
NY
03/31/09
52.6
NY
03/31/09
118.9
NY
03/31/09
125.6
NY
03/31/09
535.3
NY
03/31/09
137
NY
03/31/09
123.9
F-435

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
03/31/09
126.4
NY
03/31/09
122.4
NY
03/31/09
93.8
NY
03/31/09
96.1
NY
03/31/09
172.5
NY
03/31/09
110.2
NY
03/31/09
108.3
NY
03/31/09
116.8
NY
03/31/09
120.5
NY
03/31/09
93.8
NY
03/31/09
108.2
NY
03/31/09
114.2
NY
03/31/09
122.3
NY
03/31/09
150.6
NY
04/01/09
111.1
NY
04/01/09
105.6
NY
04/01/09
113.3
NY
04/01/09
162.3
NY
04/01/09
108.1
NY
04/01/09
112.5
NY
04/01/09
126.4
NY
04/01/09
139.8
NY
04/01/09
127.9
NY
04/01/09
154.1
NY
04/01/09
122
NY
04/01/09
132.6
NY
04/01/09
152.2
NY
04/01/09
104.4
NY
04/01/09
111.3
NY
04/01/09
111.1
NY
04/01/09
99.7
NY
04/01/09
97.9
NY
04/01/09
91.1
NY
04/01/09
93.7
NY
04/01/09
102.3
NY
04/01/09
138.1
NY
04/01/09
143.3
NY
04/01/09
147.8
NY
04/01/09
136.3
NY
04/01/09
136.6
NY
04/01/09
126.2
NY
04/01/09
105.2
NY
04/01/09
109.5
NY
04/01/09
136.4
NY
04/01/09
136.7
F-436

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/01/09
155.4
NY
04/01/09
165.8
NY
04/01/09
179.6
NY
04/01/09
115.4
NY
04/01/09
61.5
NY
04/01/09
57.2
NY
04/01/09
42.9
NY
04/01/09
50.7
NY
04/01/09
119.3
NY
04/01/09
104.2
NY
04/01/09
97.5
NY
04/01/09
101.8
NY
04/01/09
56.7
NY
04/01/09
58.5
NY
04/01/09
61.9
NY
04/01/09
53.8
NY
04/01/09
55.2
NY
04/01/09
67.1
NY
04/01/09
26.1
NY
04/01/09
26.8
NY
04/01/09
27.9
NY
04/01/09
30
NY
04/01/09
33.1
NY
04/01/09
34.2
NY
04/01/09
36.5
NY
04/01/09
40.5
NY
04/02/09
119.9
NY
04/02/09
94.3
NY
04/02/09
102.1
NY
04/02/09
100.1
NY
04/02/09
84.9
NY
04/02/09
98.8
NY
04/02/09
76.3
NY
04/02/09
82.4
NY
04/02/09
80.1
NY
04/02/09
54.9
NY
04/02/09
55.4
NY
04/02/09
64.9
NY
04/02/09
104.7
NY
04/02/09
67.6
NY
04/02/09
77
NY
04/02/09
58.5
NY
04/02/09
50
NY
04/02/09
53.3
NY
04/02/09
39
F-437

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/02/09
58.6
NY
04/02/09
64.4
NY
04/02/09
71.4
NY
04/02/09
67.8
NY
04/02/09
59.4
NY
04/02/09
74.2
NY
04/02/09
89.7
NY
04/02/09
90.8
NY
04/02/09
93.5
NY
04/02/09
107
NY
04/02/09
110.7
NY
04/02/09
125.1
NY
04/02/09
82.8
NY
04/02/09
78.4
NY
04/02/09
83
NY
04/02/09
77.6
NY
04/02/09
65.9
NY
04/02/09
99.6
NY
04/03/09
121.3
NY
04/03/09
190.8
NY
04/03/09
176.5
NY
04/03/09
168.1
NY
04/03/09
209.5
NY
04/03/09
207.5
NY
04/03/09
424.1
NY
04/03/09
219.5
NY
04/03/09
226.7
NY
04/03/09
342.3
NY
04/03/09
336.3
NY
04/03/09
274
NY
04/03/09
270.1
NY
04/03/09
349.1
NY
04/03/09
391.9
NY
04/03/09
245.5
NY
04/03/09
405.7
NY
04/03/09
370.5
NY
04/03/09
746.3
NY
04/03/09
539.7
NY
04/03/09
446.5
NY
04/03/09
275.9
NY
04/03/09
302.7
NY
04/03/09
233
NY
04/03/09
127.8
NY
04/03/09
125.1
NY
04/03/09
111.2
F-438

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/03/09
116.7
NY
04/03/09
132.5
NY
04/03/09
107.3
NY
04/03/09
110.4
NY
04/03/09
113
NY
04/03/09
110.7
NY
04/03/09
94.3
NY
04/03/09
92.9
NY
04/03/09
76
NY
04/03/09
75.9
NY
04/03/09
77.5
NY
04/03/09
74.6
NY
04/03/09
93.1
NY
04/03/09
82.4
NY
04/03/09
83
NY
04/03/09
85
NY
04/03/09
82
NY
04/03/09
79.7
NY
04/03/09
100
NY
04/03/09
39.4
NY
04/03/09
94.9
NY
04/03/09
97.6
NY
04/03/09
93.7
NY
04/03/09
91.3
NY
04/03/09
99.5
NY
04/03/09
80.5
NY
04/03/09
83.9
NY
04/03/09
80.6
NY
04/03/09
72.5
NY
04/03/09
82.5
NY
04/03/09
67.1
NY
04/03/09
66.7
NY
04/03/09
93.1
NY
04/03/09
28.2
NY
04/04/09
140
NY
04/04/09
158.5
NY
04/04/09
127
NY
04/04/09
159.3
NY
04/04/09
122.6
NY
04/04/09
120.6
NY
04/04/09
110.9
NY
04/04/09
242.3
NY
04/04/09
107.3
NY
04/04/09
120.9
NY
04/04/09
110.5
F-439

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/04/09
100.9
NY
04/04/09
801.9
NY
04/04/09
344.4
NY
04/04/09
117.6
NY
04/04/09
94.4
NY
04/04/09
101.7
NY
04/04/09
416.5
NY
04/04/09
130.4
NY
04/04/09
108.1
NY
04/04/09
101.7
NY
04/04/09
124.5
NY
04/04/09
78.9
NY
04/04/09
58.7
NY
04/04/09
181.8
NY
04/04/09
121.1
NY
04/04/09
193.6
NY
04/04/09
133.1
NY
04/05/09
111.2
NY
04/05/09
114.5
NY
04/05/09
122
NY
04/05/09
114.5
NY
04/05/09
115.1
NY
04/05/09
103.5
NY
04/05/09
118.4
NY
04/05/09
123.1
NY
04/05/09
130.4
NY
04/05/09
116.4
NY
04/05/09
126.8
NY
04/05/09
110.5
NY
04/05/09
115.3
NY
04/05/09
118.9
NY
04/05/09
117.3
NY
04/05/09
107.4
NY
04/05/09
143.2
NY
04/05/09
126.2
NY
04/05/09
138.5
NY
04/05/09
203.2
NY
04/05/09
228.8
NY
04/05/09
202.1
NY
04/05/09
201
NY
04/05/09
99.3
NY
04/05/09
42.9
NY
04/05/09
14.3
NY
04/05/09
90.7
NY
04/06/09
111.2
F-440

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/06/09
116.2
NY
04/06/09
153.9
NY
04/06/09
122.1
NY
04/06/09
137.2
NY
04/06/09
127.9
NY
04/06/09
116
NY
04/06/09
142.5
NY
04/06/09
73.4
NY
04/06/09
71.1
NY
04/06/09
134.5
NY
04/06/09
110
NY
04/06/09
117.4
NY
04/06/09
113.5
NY
04/06/09
110.5
NY
04/06/09
123.8
NY
04/06/09
111.9
NY
04/06/09
118.1
NY
04/06/09
117.7
NY
04/06/09
122.6
NY
04/06/09
126
NY
04/06/09
118.8
NY
04/06/09
123
NY
04/06/09
104.8
NY
04/06/09
113.2
NY
04/06/09
111.8
NY
04/06/09
120.3
NY
04/06/09
124.7
NY
04/06/09
131.9
NY
04/06/09
131.4
NY
04/06/09
130.8
NY
04/06/09
123
NY
04/06/09
91.3
NY
04/06/09
98.7
NY
04/06/09
83.9
NY
04/06/09
90.5
NY
04/06/09
85.9
NY
04/06/09
75.9
NY
04/06/09
86
NY
04/06/09
73.3
NY
04/06/09
42.1
NY
04/06/09
34.3
NY
04/06/09
84.3
NY
04/07/09
190.4
NY
04/07/09
150.3
NY
04/07/09
126
F-441

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/07/09
110.8
NY
04/07/09
148.1
NY
04/07/09
114.7
NY
04/07/09
233.4
NY
04/07/09
125.1
NY
04/07/09
116.2
NY
04/07/09
167.6
NY
04/07/09
115.4
NY
04/07/09
255.3
NY
04/07/09
186.6
NY
04/07/09
125.7
NY
04/07/09
126.3
NY
04/07/09
137.1
NY
04/07/09
144.7
NY
04/07/09
132.2
NY
04/07/09
140.5
NY
04/07/09
145.4
NY
04/07/09
136.9
NY
04/07/09
136.8
NY
04/07/09
144
NY
04/07/09
141.2
NY
04/07/09
145
NY
04/07/09
122.1
NY
04/07/09
155.8
NY
04/07/09
168.9
NY
04/07/09
154.6
NY
04/07/09
181.9
NY
04/07/09
132.1
NY
04/07/09
137.8
NY
04/07/09
235.3
NY
04/07/09
134.2
NY
04/07/09
145
NY
04/07/09
147.3
NY
04/07/09
138
NY
04/07/09
286.5
NY
04/07/09
125.6
NY
04/07/09
129.7
NY
04/07/09
148.5
NY
04/07/09
145.8
NY
04/07/09
226.3
NY
04/07/09
461.9
NY
04/07/09
165.9
NY
04/07/09
166.5
NY
04/07/09
201.7
NY
04/07/09
120.8
F-442

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/07/09
254.1
NY
04/07/09
122.7
NY
04/07/09
133.7
NY
04/07/09
162.2
NY
04/07/09
199.7
NY
04/07/09
126.8
NY
04/07/09
139.8
NY
04/07/09
200.2
NY
04/07/09
160.9
NY
04/07/09
131.5
NY
04/07/09
122.8
NY
04/07/09
27.4
NY
04/07/09
26
NY
04/07/09
44
NY
04/07/09
34.7
NY
04/07/09
33.9
NY
04/07/09
47.8
NY
04/07/09
170.2
NY
04/08/09
154
NY
04/08/09
139.2
NY
04/08/09
113.2
NY
04/08/09
143
NY
04/08/09
114.4
NY
04/08/09
113.1
NY
04/08/09
157.5
NY
04/08/09
127.2
NY
04/08/09
131
NY
04/08/09
141.1
NY
04/08/09
117.3
NY
04/08/09
145.5
NY
04/08/09
118.1
NY
04/08/09
119.2
NY
04/08/09
141
NY
04/08/09
131
NY
04/08/09
154.8
NY
04/08/09
101.7
NY
04/08/09
136.3
NY
04/08/09
125.9
NY
04/08/09
172.7
NY
04/08/09
187.9
NY
04/08/09
150.3
NY
04/08/09
149.2
NY
04/08/09
168
NY
04/08/09
132.6
NY
04/08/09
141.4
F-443

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/08/09
132.8
NY
04/08/09
148
NY
04/08/09
138.2
NY
04/08/09
154.7
NY
04/08/09
127.4
NY
04/08/09
141.8
NY
04/08/09
138.8
NY
04/08/09
174.2
NY
04/08/09
141.9
NY
04/08/09
177.6
NY
04/08/09
148.1
NY
04/08/09
168.1
NY
04/08/09
158.4
NY
04/08/09
196
NY
04/08/09
264.7
NY
04/08/09
80.2
NY
04/08/09
81.7
NY
04/08/09
91.7
NY
04/08/09
92.6
NY
04/08/09
176
NY
04/08/09
155.3
NY
04/08/09
138.1
NY
04/08/09
142.4
NY
04/08/09
126.9
NY
04/08/09
139.5
NY
04/08/09
137.5
NY
04/08/09
154.3
NY
04/08/09
148.4
NY
04/08/09
155.5
NY
04/08/09
100.3
NY
04/08/09
96.4
NY
04/08/09
174
NY
04/08/09
108.2
NY
04/08/09
128.9
NY
04/08/09
121.7
NY
04/08/09
120.2
NY
04/08/09
131.2
NY
04/08/09
112.7
NY
04/08/09
107.7
NY
04/08/09
123
NY
04/08/09
105.7
NY
04/08/09
102.2
NY
04/08/09
90.6
NY
04/08/09
219.4
NY
04/08/09
122.7
F-444

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/08/09
113
NY
04/09/09
221.8
NY
04/09/09
130
NY
04/09/09
154.4
NY
04/09/09
81.9
NY
04/09/09
65.3
NY
04/09/09
98.9
NY
04/09/09
60.2
NY
04/09/09
60.4
NY
04/09/09
104.9
NY
04/09/09
109.8
NY
04/09/09
121.8
NY
04/09/09
105.7
NY
04/09/09
115.2
NY
04/09/09
108.5
NY
04/09/09
116.7
NY
04/09/09
113.9
NY
04/09/09
119
NY
04/09/09
138.1
NY
04/09/09
113
NY
04/09/09
94.9
NY
04/09/09
61.2
NY
04/09/09
77
NY
04/09/09
64.2
NY
04/09/09
172.6
NY
04/09/09
124.6
NY
04/09/09
130.6
NY
04/09/09
122.8
NY
04/09/09
133.6
NY
04/09/09
127.7
NY
04/09/09
125.8
NY
04/09/09
149.3
NY
04/09/09
124.9
NY
04/09/09
160.8
NY
04/09/09
98.1
NY
04/09/09
139.4
NY
04/09/09
106
NY
04/09/09
153.7
NY
04/09/09
112.6
NY
04/09/09
118.4
NY
04/09/09
135.1
NY
04/09/09
121.4
NY
04/09/09
192.3
NY
04/09/09
207.8
NY
04/09/09
271.7
F-445

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/09/09
248.1
NY
04/09/09
251.1
NY
04/09/09
227.2
NY
04/09/09
184.6
NY
04/09/09
190.8
NY
04/09/09
158.1
NY
04/09/09
120
NY
04/09/09
138.3
NY
04/09/09
91.3
NY
04/09/09
87.1
NY
04/09/09
102.9
NY
04/09/09
90.5
NY
04/09/09
139.7
NY
04/10/09
126.6
NY
04/10/09
141.8
NY
04/10/09
135.8
NY
04/10/09
99.5
NY
04/10/09
76.9
NY
04/10/09
76.6
NY
04/10/09
71.7
NY
04/10/09
99.8
NY
04/10/09
127.8
NY
04/10/09
140.1
NY
04/10/09
124.9
NY
04/10/09
124.1
NY
04/10/09
108.7
NY
04/10/09
95
NY
04/10/09
86.9
NY
04/10/09
62.1
NY
04/10/09
59.7
NY
04/10/09
59.5
NY
04/10/09
61.5
NY
04/10/09
186.4
NY
04/10/09
100.3
NY
04/10/09
105.8
NY
04/10/09
106.9
NY
04/10/09
113.3
NY
04/10/09
114.2
NY
04/10/09
117.7
NY
04/10/09
124.4
NY
04/10/09
134.3
NY
04/10/09
139.6
NY
04/10/09
113.8
NY
04/10/09
105.5
NY
04/10/09
166.9
F-446

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/10/09
156.2
NY
04/10/09
161.4
NY
04/10/09
185
NY
04/10/09
225.3
NY
04/10/09
228.9
NY
04/10/09
189
NY
04/10/09
121.5
NY
04/10/09
142.4
NY
04/10/09
91.2
NY
04/10/09
79
NY
04/10/09
103.1
NY
04/10/09
111.8
NY
04/10/09
112.6
NY
04/10/09
272.3
NY
04/11/09
108
NY
04/11/09
104.6
NY
04/11/09
159.6
NY
04/11/09
116.9
NY
04/11/09
67.4
NY
04/11/09
69.6
NY
04/11/09
109.3
NY
04/11/09
65.6
NY
04/11/09
87.8
NY
04/11/09
118.9
NY
04/11/09
127.3
NY
04/11/09
137.6
NY
04/11/09
116.5
NY
04/11/09
104.1
NY
04/11/09
91.3
NY
04/11/09
71.6
NY
04/11/09
70.4
NY
04/11/09
90
NY
04/11/09
84.2
NY
04/11/09
149
NY
04/11/09
106.1
NY
04/11/09
109
NY
04/11/09
127.8
NY
04/11/09
161.1
NY
04/11/09
165.5
NY
04/11/09
112.9
NY
04/11/09
116.3
NY
04/11/09
85.5
NY
04/11/09
82.6
NY
04/11/09
86.7
NY
04/11/09
83.8
F-447

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/11/09
95.6
NY
04/11/09
53
NY
04/11/09
122.2
NY
04/11/09
122.7
NY
04/11/09
128
NY
04/11/09
92.7
NY
04/11/09
71.1
NY
04/11/09
72.1
NY
04/11/09
66.1
NY
04/11/09
57.6
NY
04/11/09
75.6
NY
04/11/09
90.9
NY
04/1 2/09
97.8
NY
04/1 2/09
100.2
NY
04/1 2/09
109.2
NY
04/1 2/09
120.6
NY
04/1 2/09
133.3
NY
04/1 2/09
165
NY
04/1 2/09
63.3
NY
04/1 2/09
60.2
NY
04/1 2/09
68.5
NY
04/1 2/09
418.7
NY
04/1 2/09
114
NY
04/1 2/09
125.9
NY
04/1 2/09
141.5
NY
04/1 2/09
145.3
NY
04/1 2/09
158.6
NY
04/1 2/09
107
NY
04/1 2/09
133.3
NY
04/1 2/09
93.6
NY
04/1 2/09
71.8
NY
04/1 2/09
80.7
NY
04/1 2/09
217.2
NY
04/1 2/09
147.2
NY
04/1 2/09
144.9
NY
04/1 2/09
119.4
NY
04/1 2/09
133.2
NY
04/1 2/09
126.6
NY
04/1 2/09
127.8
NY
04/1 2/09
140
NY
04/1 2/09
100.5
NY
04/1 2/09
60
NY
04/1 2/09
487.8
NY
04/1 2/09
165.8
NY
04/1 2/09
684.5
F-448

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/1 2/09
125.2
NY
04/1 2/09
114.8
NY
04/1 2/09
119.8
NY
04/1 2/09
113.4
NY
04/1 2/09
105.9
NY
04/1 2/09
125.7
NY
04/1 2/09
75
NY
04/1 2/09
72
NY
04/1 2/09
91.4
NY
04/1 2/09
62.6
NY
04/1 2/09
63.5
NY
04/1 2/09
99.9
NY
04/1 3/09
97.2
NY
04/1 3/09
102.5
NY
04/1 3/09
105.9
NY
04/1 3/09
71.9
NY
04/1 3/09
68.9
NY
04/1 3/09
67
NY
04/1 3/09
61.4
NY
04/1 3/09
65.4
NY
04/1 3/09
82
NY
04/1 3/09
83.8
NY
04/1 3/09
86.4
NY
04/1 3/09
91.4
NY
04/1 3/09
96.8
NY
04/1 3/09
112.7
NY
04/1 3/09
119.3
NY
04/1 3/09
125.9
NY
04/1 3/09
105.9
NY
04/1 3/09
110.1
NY
04/1 3/09
115.3
NY
04/1 3/09
122.6
NY
04/1 3/09
100.2
NY
04/1 3/09
75.7
NY
04/1 3/09
71.4
NY
04/1 3/09
58.9
NY
04/1 3/09
57.8
NY
04/1 3/09
87.9
NY
04/1 3/09
89.8
NY
04/1 3/09
92.2
NY
04/1 3/09
99.1
NY
04/1 3/09
111.4
NY
04/1 3/09
117.6
NY
04/1 3/09
125.6
NY
04/1 3/09
213.5
F-449

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/1 3/09
111.5
NY
04/1 3/09
115.5
NY
04/1 3/09
118.4
NY
04/1 3/09
76.3
NY
04/1 3/09
73.4
NY
04/1 3/09
99.1
NY
04/1 3/09
74
NY
04/1 3/09
74.2
NY
04/1 3/09
159.3
NY
04/14/09
155.2
NY
04/14/09
156
NY
04/14/09
149.6
NY
04/14/09
105.8
NY
04/14/09
121.5
NY
04/14/09
125.3
NY
04/14/09
127.5
NY
04/14/09
94.1
NY
04/14/09
82.5
NY
04/14/09
92.7
NY
04/14/09
115
NY
04/14/09
116.4
NY
04/14/09
119.5
NY
04/14/09
125.6
NY
04/14/09
130.9
NY
04/14/09
88
NY
04/14/09
126.7
NY
04/14/09
439.9
NY
04/14/09
142.9
NY
04/14/09
122.3
NY
04/14/09
107.3
NY
04/14/09
110.8
NY
04/14/09
100.4
NY
04/14/09
105.7
NY
04/14/09
97.1
NY
04/14/09
78.3
NY
04/14/09
80.3
NY
04/14/09
76.4
NY
04/14/09
78.5
NY
04/14/09
81.8
NY
04/14/09
80.9
NY
04/15/09
103.3
NY
04/15/09
107.3
NY
04/15/09
113.7
NY
04/15/09
112.3
NY
04/15/09
113.4
F-450

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/15/09
112.3
NY
04/15/09
93.4
NY
04/15/09
91.6
NY
04/15/09
74
NY
04/15/09
75.4
NY
04/15/09
68.6
NY
04/15/09
68.7
NY
04/15/09
69.9
NY
04/15/09
83.7
NY
04/15/09
83.9
NY
04/15/09
82.9
NY
04/15/09
86.5
NY
04/15/09
79.5
NY
04/15/09
81.3
NY
04/15/09
93
NY
04/15/09
116.2
NY
04/15/09
123.3
NY
04/15/09
127.4
NY
04/15/09
106.9
NY
04/15/09
105.5
NY
04/15/09
154.5
NY
04/15/09
161.1
NY
04/15/09
119.4
NY
04/15/09
128.2
NY
04/15/09
115.7
NY
04/15/09
119.7
NY
04/15/09
127.9
NY
04/15/09
111.6
NY
04/15/09
89
NY
04/15/09
90.9
NY
04/15/09
42.9
NY
04/15/09
44
NY
04/15/09
38.1
NY
04/15/09
35.1
NY
04/15/09
32.8
NY
04/15/09
89.4
NY
04/16/09
170.2
NY
04/16/09
185.5
NY
04/16/09
193.5
NY
04/16/09
153.6
NY
04/16/09
159.5
NY
04/16/09
141.4
NY
04/16/09
181.4
NY
04/16/09
136.4
NY
04/16/09
149.3
F-451

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/16/09
140.7
NY
04/16/09
93
NY
04/16/09
102.6
NY
04/16/09
CO
CO
CO
NY
04/16/09
93.2
NY
04/16/09
201
NY
04/16/09
120
NY
04/16/09
120.3
NY
04/16/09
127.6
NY
04/16/09
116.6
NY
04/16/09
122.5
NY
04/16/09
154
NY
04/16/09
155.8
NY
04/16/09
177.5
NY
04/16/09
194.7
NY
04/16/09
168.9
NY
04/16/09
190.6
NY
04/16/09
162.6
NY
04/16/09
181.1
NY
04/16/09
128.2
NY
04/16/09
79.7
NY
04/16/09
81.1
NY
04/16/09
140
NY
04/16/09
108.8
NY
04/16/09
117
NY
04/16/09
120
NY
04/16/09
182
NY
04/16/09
103.7
NY
04/16/09
107.1
NY
04/16/09
113.7
NY
04/16/09
69.6
NY
04/16/09
70.9
NY
04/16/09
114.8
NY
04/16/09
190.8
NY
04/16/09
82.6
NY
04/16/09
85.1
NY
04/16/09
98.2
NY
04/16/09
142.5
NY
04/16/09
148.7
NY
04/16/09
131.4
NY
04/16/09
109
NY
04/16/09
93.7
NY
04/16/09
79.5
NY
04/16/09
78.6
NY
04/16/09
68.9
F-452

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/16/09
73.6
NY
04/16/09
104.4
NY
04/1 7/09
124.7
NY
04/1 7/09
127.8
NY
04/1 7/09
135.8
NY
04/1 7/09
116.6
NY
04/1 7/09
114.8
NY
04/1 7/09
86.8
NY
04/1 7/09
77.8
NY
04/1 7/09
72.6
NY
04/1 7/09
64.9
NY
04/1 7/09
101.1
NY
04/1 7/09
67.8
NY
04/1 7/09
67.1
NY
04/1 7/09
117.4
NY
04/1 7/09
122.4
NY
04/1 7/09
129.5
NY
04/1 7/09
114.1
NY
04/1 7/09
72.9
NY
04/1 7/09
114
NY
04/1 7/09
95.3
NY
04/1 7/09
76.5
NY
04/1 7/09
85.2
NY
04/1 7/09
123.6
NY
04/1 7/09
120.9
NY
04/1 7/09
127.9
NY
04/1 7/09
157.8
NY
04/1 7/09
113
NY
04/1 7/09
115
NY
04/1 7/09
115.9
NY
04/1 7/09
92
NY
04/1 7/09
91.6
NY
04/1 7/09
90
NY
04/1 7/09
85.7
NY
04/1 7/09
96.5
NY
04/1 7/09
127.3
NY
04/1 7/09
132.7
NY
04/1 7/09
137.5
NY
04/1 7/09
157.2
NY
04/1 7/09
160.1
NY
04/1 7/09
109.4
NY
04/1 7/09
76.3
NY
04/1 7/09
76.5
NY
04/1 7/09
76.6
NY
04/1 7/09
94.4
F-453

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/18/09
103.5
NY
04/18/09
106.3
NY
04/18/09
106.8
NY
04/18/09
108.2
NY
04/18/09
91.4
NY
04/18/09
89.1
NY
04/18/09
75.3
NY
04/18/09
72.7
NY
04/18/09
98.8
NY
04/18/09
57.2
NY
04/18/09
53
NY
04/18/09
57.7
NY
04/18/09
108.7
NY
04/18/09
113.7
NY
04/18/09
121.1
NY
04/18/09
125.7
NY
04/18/09
108.2
NY
04/18/09
92.7
NY
04/18/09
97
NY
04/18/09
100.9
NY
04/18/09
145.3
NY
04/18/09
93.3
NY
04/18/09
93.6
NY
04/18/09
101
NY
04/18/09
158.4
NY
04/18/09
170.6
NY
04/18/09
140.3
NY
04/18/09
122.8
NY
04/18/09
120.4
NY
04/18/09
99.8
NY
04/18/09
99.5
NY
04/18/09
80.1
NY
04/18/09
81.2
NY
04/18/09
119.3
NY
04/18/09
109.9
NY
04/18/09
110.4
NY
04/18/09
118.1
NY
04/18/09
130.4
NY
04/18/09
123.2
NY
04/18/09
80.6
NY
04/18/09
82.6
NY
04/18/09
80.1
NY
04/18/09
87.2
NY
04/19/09
121.9
NY
04/19/09
122.5
F-454

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/19/09
132.6
NY
04/19/09
142.9
NY
04/19/09
126.5
NY
04/19/09
102.2
NY
04/19/09
100
NY
04/19/09
85.1
NY
04/19/09
96.4
NY
04/19/09
73.5
NY
04/19/09
71.3
NY
04/19/09
154.1
NY
04/19/09
164.7
NY
04/19/09
175.6
NY
04/19/09
151
NY
04/19/09
118.3
NY
04/19/09
150.9
NY
04/19/09
128.1
NY
04/19/09
138.1
NY
04/19/09
128
NY
04/19/09
104.8
NY
04/19/09
139
NY
04/19/09
462.6
NY
04/19/09
129.1
NY
04/19/09
159.6
NY
04/19/09
162.2
NY
04/19/09
163.7
NY
04/19/09
166
NY
04/19/09
149.7
NY
04/19/09
167.9
NY
04/19/09
176.3
NY
04/19/09
91.5
NY
04/19/09
105.4
NY
04/19/09
104.1
NY
04/19/09
103.6
NY
04/19/09
116.9
NY
04/19/09
135.6
NY
04/19/09
139.4
NY
04/19/09
132
NY
04/19/09
93.5
NY
04/19/09
98.3
NY
04/19/09
101.9
NY
04/19/09
116.4
NY
04/20/09
212.4
NY
04/20/09
206.1
NY
04/20/09
193.4
NY
04/20/09
133.8
F-455

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/20/09
147.4
NY
04/20/09
183.8
NY
04/20/09
180.9
NY
04/20/09
104.5
NY
04/20/09
57.3
NY
04/20/09
123.1
NY
04/20/09
122.7
NY
04/20/09
128.5
NY
04/20/09
135.1
NY
04/20/09
137.7
NY
04/20/09
141.7
NY
04/20/09
117.2
NY
04/20/09
118.1
NY
04/20/09
123.6
NY
04/20/09
114.4
NY
04/20/09
107.5
NY
04/20/09
102.6
NY
04/20/09
144.3
NY
04/20/09
145.9
NY
04/20/09
145.3
NY
04/20/09
155.7
NY
04/20/09
157.7
NY
04/20/09
140
NY
04/20/09
119.8
NY
04/20/09
122.2
NY
04/20/09
125.9
NY
04/20/09
111
NY
04/20/09
115.5
NY
04/20/09
108.5
NY
04/20/09
97.7
NY
04/20/09
115.6
NY
04/20/09
60.2
NY
04/21/09
114
NY
04/21/09
124.6
NY
04/21/09
145.2
NY
04/21/09
97
NY
04/21/09
79.1
NY
04/21/09
151.3
NY
04/21/09
143
NY
04/21/09
174.9
NY
04/21/09
179.9
NY
04/21/09
317.2
NY
04/21/09
67.7
NY
04/21/09
100.9
NY
04/21/09
117.7
F-456

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/21/09
167.5
NY
04/21/09
69.6
NY
04/21/09
65.6
NY
04/21/09
203.4
NY
04/21/09
77
NY
04/21/09
95.7
NY
04/21/09
56.7
NY
04/21/09
165.5
NY
04/21/09
165.7
NY
04/21/09
280.2
NY
04/21/09
183.1
NY
04/21/09
186.8
NY
04/21/09
223.7
NY
04/21/09
146.2
NY
04/21/09
139.9
NY
04/21/09
145.2
NY
04/21/09
145.2
NY
04/21/09
151
NY
04/21/09
162.7
NY
04/21/09
177.1
NY
04/21/09
166.9
NY
04/21/09
145.6
NY
04/21/09
110.6
NY
04/21/09
115.2
NY
04/21/09
118.2
NY
04/21/09
133.7
NY
04/21/09
104.8
NY
04/22/09
120.9
NY
04/22/09
124.2
NY
04/22/09
122.5
NY
04/22/09
123.2
NY
04/22/09
108.4
NY
04/22/09
109.8
NY
04/22/09
115.1
NY
04/22/09
119.6
NY
04/22/09
138
NY
04/22/09
148.2
NY
04/22/09
134.1
NY
04/22/09
121.3
NY
04/22/09
110
NY
04/22/09
73.6
NY
04/22/09
97.6
NY
04/22/09
113.1
NY
04/22/09
117.5
NY
04/22/09
126.9
F-457

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/22/09
135.9
NY
04/22/09
145.8
NY
04/22/09
150.6
NY
04/22/09
139.6
NY
04/22/09
140.7
NY
04/22/09
105.3
NY
04/22/09
116.8
NY
04/22/09
95.6
NY
04/22/09
93.7
NY
04/22/09
128.8
NY
04/22/09
100.2
NY
04/22/09
131.9
NY
04/22/09
121.4
NY
04/22/09
123.6
NY
04/22/09
139.7
NY
04/22/09
103.5
NY
04/22/09
114.9
NY
04/22/09
72.3
NY
04/22/09
62.1
NY
04/22/09
66.2
NY
04/22/09
43
NY
04/22/09
248.4
NY
04/22/09
185.2
NY
04/22/09
120.8
NY
04/22/09
122.1
NY
04/22/09
88.7
NY
04/22/09
114.5
NY
04/22/09
106.6
NY
04/22/09
119.7
NY
04/22/09
93.4
NY
04/22/09
120.7
NY
04/22/09
92.1
NY
04/22/09
114.6
NY
04/22/09
106
NY
04/23/09
68.3
NY
04/23/09
78.9
NY
04/23/09
93.5
NY
04/23/09
98.4
NY
04/23/09
84.2
NY
04/23/09
95.6
NY
04/23/09
46.9
NY
04/23/09
84.5
NY
04/23/09
97.3
NY
04/23/09
96.1
NY
04/23/09
113.6
F-458

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/23/09
89.5
NY
04/23/09
123.4
NY
04/23/09
79.9
NY
04/23/09
124.4
NY
04/23/09
99.8
NY
04/23/09
172.8
NY
04/23/09
142.3
NY
04/23/09
124.3
NY
04/23/09
82.2
NY
04/23/09
143
NY
04/23/09
118.1
NY
04/23/09
85.6
NY
04/23/09
99.7
NY
04/23/09
195.6
NY
04/23/09
163.1
NY
04/23/09
175.2
NY
04/23/09
194.7
NY
04/23/09
253.5
NY
04/23/09
145.5
NY
04/23/09
152.2
NY
04/23/09
143.3
NY
04/23/09
115.8
NY
04/23/09
157.3
NY
04/23/09
104.1
NY
04/23/09
135
NY
04/23/09
122.3
NY
04/23/09
143.4
NY
04/23/09
125.6
NY
04/23/09
329.3
NY
04/23/09
834.2
NY
04/23/09
313.5
NY
04/23/09
239.1
NY
04/23/09
582.2
NY
04/23/09
54.8
NY
04/23/09
145.7
NY
04/23/09
129.9
NY
04/23/09
113.1
NY
04/24/09
44.7
NY
04/24/09
49.6
NY
04/24/09
56.1
NY
04/24/09
61.8
NY
04/24/09
71.3
NY
04/24/09
102.1
NY
04/24/09
91.7
NY
04/24/09
97.7
F-459

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/24/09
87.5
NY
04/24/09
78.5
NY
04/24/09
45
NY
04/24/09
59.8
NY
04/24/09
48.2
NY
04/24/09
94.7
NY
04/24/09
28.4
NY
04/24/09
90.1
NY
04/24/09
81.2
NY
04/24/09
89.5
NY
04/24/09
116.7
NY
04/24/09
100.2
NY
04/24/09
69.5
NY
04/24/09
71.7
NY
04/24/09
94.4
NY
04/24/09
58.8
NY
04/24/09
59.9
NY
04/24/09
76.1
NY
04/24/09
96.6
NY
04/24/09
88.9
NY
04/24/09
100.2
NY
04/24/09
95.2
NY
04/24/09
102.3
NY
04/24/09
95.8
NY
04/24/09
103.3
NY
04/24/09
89.4
NY
04/24/09
44.3
NY
04/24/09
80.5
NY
04/24/09
52.2
NY
04/24/09
78.7
NY
04/24/09
94.9
NY
04/24/09
93.8
NY
04/24/09
102.8
NY
04/24/09
57.1
NY
04/24/09
73.8
NY
04/24/09
64.2
NY
04/24/09
80.4
NY
04/24/09
61.4
NY
04/24/09
71.3
NY
04/24/09
120.7
NY
04/25/09
70.7
NY
04/25/09
74
NY
04/25/09
79.6
NY
04/25/09
83.4
NY
04/25/09
96
F-460

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/25/09
114.9
NY
04/25/09
88.1
NY
04/25/09
60.1
NY
04/25/09
66.9
NY
04/25/09
50.9
NY
04/25/09
71.3
NY
04/25/09
24.8
NY
04/25/09
122.6
NY
04/25/09
133.4
NY
04/25/09
180.4
NY
04/25/09
149.2
NY
04/25/09
124.1
NY
04/25/09
136.5
NY
04/25/09
104.4
NY
04/25/09
103.8
NY
04/25/09
64.5
NY
04/25/09
64.7
NY
04/25/09
67.4
NY
04/25/09
66
NY
04/25/09
77.7
NY
04/25/09
28.3
NY
04/25/09
111.5
NY
04/25/09
103.5
NY
04/25/09
99.4
NY
04/25/09
CO
CO
CO
NY
04/25/09
97.1
NY
04/25/09
94.2
NY
04/25/09
39.3
NY
04/25/09
38.6
NY
04/25/09
117.6
NY
04/25/09
81
NY
04/25/09
36
NY
04/25/09
64.4
NY
04/25/09
98
NY
04/25/09
93.1
NY
04/25/09
91.8
NY
04/25/09
48.8
NY
04/25/09
57.8
NY
04/25/09
44.1
NY
04/25/09
62
NY
04/25/09
27.7
NY
04/26/09
84.5
NY
04/26/09
82.1
NY
04/26/09
84.2
NY
04/26/09
79.3
F-461

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/26/09
78.9
NY
04/26/09
54.4
NY
04/26/09
69.2
NY
04/26/09
27.3
NY
04/26/09
29.4
NY
04/26/09
29.6
NY
04/26/09
112.2
NY
04/26/09
122
NY
04/26/09
129.1
NY
04/26/09
121.2
NY
04/26/09
167.6
NY
04/26/09
157.3
NY
04/26/09
107.2
NY
04/26/09
107.2
NY
04/26/09
73.4
NY
04/26/09
108.1
NY
04/26/09
85.1
NY
04/26/09
133.1
NY
04/26/09
187.3
NY
04/26/09
144.9
NY
04/26/09
147.4
NY
04/26/09
123.9
NY
04/26/09
131.6
NY
04/26/09
142.9
NY
04/26/09
47.3
NY
04/26/09
46.9
NY
04/26/09
50.4
NY
04/26/09
45
NY
04/26/09
52.2
NY
04/26/09
43.3
NY
04/26/09
92.1
NY
04/26/09
90
NY
04/26/09
95.5
NY
04/26/09
96.8
NY
04/26/09
106.5
NY
04/26/09
71.5
NY
04/26/09
61.7
NY
04/26/09
65.4
NY
04/26/09
64.7
NY
04/26/09
69.1
NY
04/26/09
69.3
NY
04/26/09
72.6
NY
04/26/09
52.8
NY
04/27/09
70
NY
04/27/09
74.1
F-462

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/27/09
74.1
NY
04/27/09
60.6
NY
04/27/09
66.5
NY
04/27/09
58.2
NY
04/27/09
77.3
NY
04/27/09
30.9
NY
04/27/09
34.4
NY
04/27/09
394.4
NY
04/27/09
126.4
NY
04/27/09
97.9
NY
04/27/09
108.5
NY
04/27/09
78.3
NY
04/27/09
76.8
NY
04/27/09
110.6
NY
04/27/09
70.5
NY
04/27/09
69.2
NY
04/27/09
138.1
NY
04/27/09
292
NY
04/27/09
364.6
NY
04/27/09
653
NY
04/27/09
185.9
NY
04/27/09
96
NY
04/27/09
82.7
NY
04/27/09
54.5
NY
04/27/09
47.8
NY
04/27/09
48
NY
04/27/09
101.2
NY
04/27/09
48
NY
04/27/09
49.4
NY
04/27/09
69.6
NY
04/27/09
37.8
NY
04/27/09
73.3
NY
04/27/09
77.3
NY
04/27/09
80.1
NY
04/27/09
80.9
NY
04/27/09
78
NY
04/27/09
74.2
NY
04/27/09
73.9
NY
04/27/09
66.4
NY
04/27/09
40.8
NY
04/27/09
49.1
NY
04/27/09
28.9
NY
04/27/09
30.7
NY
04/27/09
33.8
NY
04/27/09
33.7
F-463

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/28/09
158.1
NY
04/28/09
156.1
NY
04/28/09
161.4
NY
04/28/09
158.7
NY
04/28/09
152.6
NY
04/28/09
148.9
NY
04/28/09
148.8
NY
04/28/09
146.6
NY
04/28/09
150.8
NY
04/28/09
152.5
NY
04/28/09
127.6
NY
04/28/09
145.7
NY
04/28/09
136.8
NY
04/28/09
149.8
NY
04/28/09
132.1
NY
04/28/09
140
NY
04/28/09
180.9
NY
04/28/09
112.4
NY
04/28/09
101.5
NY
04/28/09
116.4
NY
04/28/09
114.2
NY
04/28/09
117.2
NY
04/28/09
108.9
NY
04/28/09
115.6
NY
04/28/09
127.8
NY
04/28/09
121.7
NY
04/28/09
127.3
NY
04/28/09
116.6
NY
04/28/09
127.4
NY
04/28/09
105.6
NY
04/28/09
211.1
NY
04/28/09
96.9
NY
04/28/09
105.2
NY
04/28/09
97.2
NY
04/28/09
93
NY
04/28/09
81.3
NY
04/28/09
75.2
NY
04/28/09
130.7
NY
04/28/09
220.2
NY
04/28/09
192.1
NY
04/28/09
113
NY
04/28/09
113.4
NY
04/28/09
235.4
NY
04/28/09
250.8
NY
04/28/09
278.9
F-464

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/28/09
300
NY
04/28/09
550.2
NY
04/28/09
106.6
NY
04/28/09
108.1
NY
04/28/09
108.5
NY
04/28/09
102.3
NY
04/28/09
105.5
NY
04/28/09
107
NY
04/28/09
61.4
NY
04/28/09
63.3
NY
04/28/09
57.5
NY
04/28/09
52.7
NY
04/28/09
61.8
NY
04/28/09
85.8
NY
04/28/09
90.3
NY
04/28/09
94.4
NY
04/28/09
89.8
NY
04/28/09
92.3
NY
04/28/09
95.2
NY
04/28/09
86.6
NY
04/28/09
44
NY
04/28/09
45.3
NY
04/28/09
42.9
NY
04/28/09
60.6
NY
04/28/09
30.2
NY
04/29/09
169.4
NY
04/29/09
168.3
NY
04/29/09
157.4
NY
04/29/09
135.6
NY
04/29/09
137.1
NY
04/29/09
136.8
NY
04/29/09
151.2
NY
04/29/09
167.5
NY
04/29/09
172.5
NY
04/29/09
177.8
NY
04/29/09
159.8
NY
04/29/09
159.5
NY
04/29/09
134.4
NY
04/29/09
143.8
NY
04/29/09
150.2
NY
04/29/09
128.7
NY
04/29/09
173.4
NY
04/29/09
175.7
NY
04/29/09
174.2
NY
04/29/09
161.2
F-465

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/29/09
164.8
NY
04/29/09
184.7
NY
04/29/09
186.6
NY
04/29/09
177.7
NY
04/29/09
175.5
NY
04/29/09
171.4
NY
04/29/09
111.1
NY
04/29/09
113.8
NY
04/29/09
114.7
NY
04/29/09
126.1
NY
04/29/09
144
NY
04/29/09
146.2
NY
04/29/09
136
NY
04/29/09
136.2
NY
04/29/09
129.8
NY
04/29/09
129.2
NY
04/29/09
99.3
NY
04/29/09
104.6
NY
04/29/09
109.5
NY
04/29/09
148.3
NY
04/30/09
215.2
NY
04/30/09
219.9
NY
04/30/09
216.6
NY
04/30/09
183.5
NY
04/30/09
184.7
NY
04/30/09
184.9
NY
04/30/09
199.1
NY
04/30/09
235.1
NY
04/30/09
173.9
NY
04/30/09
159.8
NY
04/30/09
178.5
NY
04/30/09
201.7
NY
04/30/09
203.3
NY
04/30/09
206.6
NY
04/30/09
189.6
NY
04/30/09
186.7
NY
04/30/09
152.9
NY
04/30/09
146.1
NY
04/30/09
147.7
NY
04/30/09
150.8
NY
04/30/09
176
NY
04/30/09
199.8
NY
04/30/09
199.8
NY
04/30/09
192.4
NY
04/30/09
185.2
F-466

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
04/30/09
164.2
NY
04/30/09
169.5
NY
04/30/09
155.5
NY
04/30/09
159
NY
04/30/09
125.4
NY
04/30/09
114.8
NY
04/30/09
110.2
NY
04/30/09
109
NY
04/30/09
149.3
NY
04/30/09
152.4
NY
04/30/09
151.1
NY
04/30/09
154.6
NY
04/30/09
116.2
NY
04/30/09
114.1
NY
04/30/09
113.7
NY
04/30/09
147.6
NY
04/30/09
164
NY
05/01/09
98
NY
05/01/09
98.2
NY
05/01/09
117.4
NY
05/01/09
100.7
NY
05/01/09
106.4
NY
05/01/09
90.6
NY
05/01/09
97.3
NY
05/01/09
89.1
NY
05/01/09
83.8
NY
05/01/09
66.4
NY
05/01/09
54.1
NY
05/01/09
108.8
NY
05/01/09
31.9
NY
05/01/09
93.2
NY
05/01/09
123.5
NY
05/01/09
96.2
NY
05/01/09
97.7
NY
05/01/09
34.2
NY
05/01/09
2.3
NY
05/01/09
251.5
NY
05/01/09
296.3
NY
05/01/09
3.3
NY
05/01/09
131.3
NY
05/01/09
120.4
NY
05/01/09
225.7
NY
05/01/09
240.6
NY
05/01/09
239.3
NY
05/01/09
238.4
F-467

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/01/09
245.5
NY
05/01/09
245.6
NY
05/01/09
246.9
NY
05/01/09
242.2
NY
05/01/09
240.5
NY
05/01/09
241.2
NY
05/01/09
240.9
NY
05/01/09
239.3
NY
05/01/09
227.6
NY
05/01/09
242.1
NY
05/01/09
242.1
NY
05/01/09
239.6
NY
05/01/09
239.8
NY
05/01/09
237.8
NY
05/01/09
238
NY
05/01/09
245.2
NY
05/01/09
240.7
NY
05/01/09
243.8
NY
05/01/09
214.5
NY
05/01/09
211.3
NY
05/01/09
212.7
NY
05/01/09
212.6
NY
05/01/09
212.8
NY
05/01/09
236.3
NY
05/01/09
237
NY
05/01/09
239.8
NY
05/01/09
234.7
NY
05/01/09
227.7
NY
05/01/09
191.7
NY
05/01/09
194.1
NY
05/01/09
195.4
NY
05/01/09
205
NY
05/01/09
185.4
NY
05/01/09
180.9
NY
05/02/09
79.9
NY
05/02/09
82.6
NY
05/02/09
75.7
NY
05/02/09
46.5
NY
05/02/09
48.5
NY
05/02/09
48.5
NY
05/02/09
59.4
NY
05/02/09
80.7
NY
05/02/09
86.9
NY
05/02/09
75.1
NY
05/02/09
53.9
F-468

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/02/09
53.2
NY
05/02/09
52.5
NY
05/02/09
77.3
NY
05/02/09
70.6
NY
05/02/09
66.7
NY
05/02/09
68.6
NY
05/02/09
121.6
NY
05/02/09
147.9
NY
05/02/09
151.4
NY
05/02/09
141.9
NY
05/02/09
119.2
NY
05/02/09
88.3
NY
05/02/09
55.2
NY
05/02/09
57.6
NY
05/02/09
64.8
NY
05/02/09
69.4
NY
05/02/09
127.2
NY
05/02/09
100.6
NY
05/02/09
90.9
NY
05/02/09
97.3
NY
05/02/09
96.9
NY
05/02/09
101.8
NY
05/02/09
102
NY
05/02/09
105.9
NY
05/02/09
75.9
NY
05/02/09
81
NY
05/02/09
78.2
NY
05/02/09
125.6
NY
05/02/09
98
NY
05/02/09
102.1
NY
05/02/09
109.5
NY
05/02/09
96.6
NY
05/03/09
69.8
NY
05/03/09
73.6
NY
05/03/09
67.4
NY
05/03/09
45.1
NY
05/03/09
47.4
NY
05/03/09
44.9
NY
05/03/09
62.6
NY
05/03/09
80.1
NY
05/03/09
82.3
NY
05/03/09
78.8
NY
05/03/09
59.4
NY
05/03/09
58.2
NY
05/03/09
56.4
F-469

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/03/09
69.3
NY
05/03/09
91.1
NY
05/03/09
95.1
NY
05/03/09
95.6
NY
05/03/09
96.9
NY
05/03/09
92.2
NY
05/03/09
86.4
NY
05/03/09
73.2
NY
05/03/09
56.9
NY
05/03/09
58.2
NY
05/03/09
56.6
NY
05/03/09
68.9
NY
05/03/09
90.9
NY
05/03/09
94.8
NY
05/03/09
95.8
NY
05/03/09
91
NY
05/03/09
89.8
NY
05/03/09
85.5
NY
05/03/09
79
NY
05/03/09
45.7
NY
05/03/09
45.9
NY
05/03/09
43.2
NY
05/03/09
70
NY
05/04/09
132.5
NY
05/04/09
130.5
NY
05/04/09
137.3
NY
05/04/09
109.8
NY
05/04/09
106.5
NY
05/04/09
102.9
NY
05/04/09
92.3
NY
05/04/09
66.7
NY
05/04/09
100.7
NY
05/04/09
103.8
NY
05/04/09
103.2
NY
05/04/09
103.4
NY
05/04/09
102.7
NY
05/04/09
96.7
NY
05/04/09
83.6
NY
05/04/09
95.9
NY
05/04/09
103.6
NY
05/04/09
97.5
NY
05/04/09
100.8
NY
05/04/09
97.3
NY
05/04/09
86.5
NY
05/04/09
81.6
F-470

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/04/09
72.1
NY
05/04/09
53.2
NY
05/04/09
49.8
NY
05/04/09
54.9
NY
05/04/09
55.9
NY
05/04/09
134.2
NY
05/04/09
85.3
NY
05/04/09
90.1
NY
05/04/09
75.4
NY
05/04/09
74.1
NY
05/04/09
68
NY
05/04/09
68.1
NY
05/04/09
50.9
NY
05/04/09
68.5
NY
05/04/09
91.1
NY
05/04/09
79.2
NY
05/04/09
148.1
NY
05/05/09
131.6
NY
05/05/09
126.6
NY
05/05/09
123.4
NY
05/05/09
117.5
NY
05/05/09
90.8
NY
05/05/09
103.5
NY
05/05/09
112.6
NY
05/05/09
113.3
NY
05/05/09
125.5
NY
05/05/09
119
NY
05/05/09
119.3
NY
05/05/09
118.1
NY
05/05/09
117.7
NY
05/05/09
113.9
NY
05/05/09
92.4
NY
05/05/09
114.2
NY
05/05/09
138.3
NY
05/05/09
137.2
NY
05/05/09
121.9
NY
05/05/09
122
NY
05/05/09
113.6
NY
05/05/09
104.9
NY
05/05/09
108.5
NY
05/05/09
115.4
NY
05/05/09
108.5
NY
05/05/09
99.1
NY
05/05/09
90.9
NY
05/05/09
98.7
F-471

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/05/09
132.2
NY
05/05/09
151.6
NY
05/05/09
149
NY
05/05/09
139.5
NY
05/05/09
130.2
NY
05/05/09
119.1
NY
05/05/09
117.8
NY
05/05/09
111.5
NY
05/05/09
102.7
NY
05/05/09
96
NY
05/06/09
128.3
NY
05/06/09
129.3
NY
05/06/09
137.2
NY
05/06/09
172.2
NY
05/06/09
146.5
NY
05/06/09
108.4
NY
05/06/09
127.6
NY
05/06/09
42.6
NY
05/06/09
137.2
NY
05/06/09
133.4
NY
05/06/09
128.6
NY
05/06/09
126.3
NY
05/06/09
111.9
NY
05/06/09
136.6
NY
05/06/09
176.4
NY
05/06/09
140.4
NY
05/06/09
187.9
NY
05/06/09
105
NY
05/06/09
89.2
NY
05/06/09
108.1
NY
05/06/09
110
NY
05/06/09
117.6
NY
05/06/09
118.4
NY
05/06/09
109.4
NY
05/06/09
107.1
NY
05/06/09
104.8
NY
05/06/09
102.5
NY
05/06/09
127.7
NY
05/06/09
104
NY
05/06/09
105.9
NY
05/06/09
108.8
NY
05/06/09
113
NY
05/06/09
119
NY
05/06/09
130.2
NY
05/07/09
43.9
F-472

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/07/09
77.6
NY
05/07/09
81.1
NY
05/07/09
96.2
NY
05/07/09
99.4
NY
05/07/09
108.3
NY
05/07/09
113.7
NY
05/07/09
108.8
NY
05/07/09
59.9
NY
05/07/09
59.3
NY
05/07/09
108.7
NY
05/07/09
106.7
NY
05/07/09
114
NY
05/07/09
201.3
NY
05/07/09
195
NY
05/07/09
195.2
NY
05/07/09
194.2
NY
05/07/09
191.8
NY
05/07/09
183.9
NY
05/07/09
181.6
NY
05/07/09
184.6
NY
05/07/09
181.8
NY
05/07/09
183.3
NY
05/07/09
175.7
NY
05/07/09
171.1
NY
05/07/09
168.3
NY
05/07/09
167.1
NY
05/07/09
170
NY
05/07/09
173
NY
05/07/09
175.3
NY
05/07/09
163.4
NY
05/07/09
165.7
NY
05/07/09
167.5
NY
05/07/09
169.6
NY
05/07/09
173.4
NY
05/07/09
166.4
NY
05/07/09
163.7
NY
05/07/09
159.5
NY
05/07/09
130
NY
05/07/09
111.6
NY
05/07/09
192.8
NY
05/07/09
173.3
NY
05/07/09
189.4
NY
05/07/09
171
NY
05/07/09
174.9
NY
05/07/09
153.8
F-473

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/07/09
159
NY
05/07/09
43
NY
05/08/09
166.8
NY
05/08/09
177.5
NY
05/08/09
127
NY
05/08/09
93
NY
05/08/09
92.7
NY
05/08/09
72.8
NY
05/08/09
85.6
NY
05/08/09
62.1
NY
05/08/09
112
NY
05/08/09
30.4
NY
05/08/09
139.8
NY
05/08/09
153.5
NY
05/08/09
112.3
NY
05/08/09
139.1
NY
05/08/09
115.4
NY
05/08/09
138.3
NY
05/08/09
134.9
NY
05/08/09
111.2
NY
05/08/09
142
NY
05/08/09
124.7
NY
05/08/09
96.5
NY
05/08/09
121.7
NY
05/08/09
114.6
NY
05/08/09
100.6
NY
05/08/09
69
NY
05/08/09
86.6
NY
05/08/09
85.5
NY
05/08/09
239.1
NY
05/08/09
CO
CO
CO
NY
05/08/09
95.4
NY
05/08/09
112.3
NY
05/08/09
108.4
NY
05/08/09
100.5
NY
05/08/09
101
NY
05/08/09
96.2
NY
05/08/09
90.2
NY
05/08/09
85
NY
05/08/09
112.7
NY
05/08/09
101.3
NY
05/08/09
101.1
NY
05/08/09
86.3
NY
05/08/09
89.7
NY
05/08/09
99
F-474

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/08/09
107.7
NY
05/08/09
102.5
NY
05/08/09
81.8
NY
05/08/09
84.9
NY
05/08/09
91.8
NY
05/08/09
97.9
NY
05/08/09
84.6
NY
05/08/09
72.2
NY
05/08/09
52.2
NY
05/08/09
38.2
NY
05/08/09
35.2
NY
05/08/09
32.8
NY
05/08/09
159.8
NY
05/09/09
92.2
NY
05/09/09
96.6
NY
05/09/09
83
NY
05/09/09
55
NY
05/09/09
92.3
NY
05/09/09
114.4
NY
05/09/09
122.3
NY
05/09/09
138
NY
05/09/09
156.3
NY
05/09/09
172
NY
05/09/09
164.4
NY
05/09/09
141.9
NY
05/09/09
143.2
NY
05/09/09
121.7
NY
05/09/09
97.5
NY
05/09/09
97.5
NY
05/09/09
126.4
NY
05/09/09
112.4
NY
05/09/09
84.2
NY
05/09/09
91.9
NY
05/09/09
111.1
NY
05/09/09
112.3
NY
05/09/09
114.3
NY
05/09/09
113.8
NY
05/09/09
112
NY
05/09/09
112.5
NY
05/09/09
101
NY
05/09/09
136.5
NY
05/09/09
94.4
NY
05/09/09
99.3
NY
05/09/09
90
NY
05/09/09
95.7
F-475

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/09/09
72.1
NY
05/09/09
74.9
NY
05/09/09
48.8
NY
05/09/09
53.4
NY
05/09/09
58.8
NY
05/09/09
125.2
NY
05/09/09
24.2
NY
05/10/09
103.3
NY
05/10/09
209.3
NY
05/10/09
189.5
NY
05/10/09
89.1
NY
05/10/09
72.2
NY
05/10/09
100.8
NY
05/10/09
129.9
NY
05/10/09
133.7
NY
05/10/09
112.2
NY
05/10/09
87
NY
05/10/09
91.7
NY
05/10/09
96.5
NY
05/10/09
171.8
NY
05/10/09
114.3
NY
05/10/09
114.8
NY
05/10/09
112.8
NY
05/10/09
110.5
NY
05/10/09
106.2
NY
05/10/09
76.1
NY
05/10/09
100.4
NY
05/10/09
73.7
NY
05/10/09
116.7
NY
05/10/09
118.4
NY
05/10/09
125.3
NY
05/10/09
111.1
NY
05/10/09
106.5
NY
05/10/09
59.2
NY
05/10/09
59.8
NY
05/10/09
57.4
NY
05/10/09
63.3
NY
05/10/09
115.6
NY
05/11/09
81.1
NY
05/11/09
82
NY
05/11/09
93.8
NY
05/11/09
42.7
NY
05/11/09
100.7
NY
05/11/09
108.2
NY
05/11/09
117.1
F-476

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/11/09
117
NY
05/11/09
115.9
NY
05/11/09
110.1
NY
05/11/09
105.5
NY
05/11/09
104.7
NY
05/11/09
114.6
NY
05/11/09
105.1
NY
05/11/09
90.9
NY
05/11/09
87.4
NY
05/11/09
93.1
NY
05/11/09
103
NY
05/11/09
105.6
NY
05/11/09
107.9
NY
05/11/09
97.3
NY
05/11/09
95.7
NY
05/11/09
94.9
NY
05/11/09
97
NY
05/11/09
159.4
NY
05/11/09
110.7
NY
05/11/09
116
NY
05/11/09
116.3
NY
05/11/09
106.1
NY
05/11/09
106.7
NY
05/11/09
93.4
NY
05/1 2/09
59.7
NY
05/1 2/09
51.4
NY
05/1 2/09
49.5
NY
05/1 2/09
45.9
NY
05/1 2/09
44.2
NY
05/1 2/09
107.5
NY
05/1 2/09
234.8
NY
05/1 2/09
166.5
NY
05/1 2/09
152.4
NY
05/1 2/09
139.6
NY
05/1 2/09
133.4
NY
05/1 2/09
136
NY
05/1 2/09
128.9
NY
05/1 2/09
107.3
NY
05/1 2/09
121.3
NY
05/1 2/09
119.5
NY
05/1 2/09
112.6
NY
05/1 2/09
109.8
NY
05/1 2/09
110.8
NY
05/1 2/09
112.3
NY
05/1 2/09
97.9
F-477

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/1 2/09
90.1
NY
05/1 2/09
101.4
NY
05/1 3/09
86.2
NY
05/1 3/09
88.3
NY
05/1 3/09
94.2
NY
05/1 3/09
112.2
NY
05/1 3/09
95.2
NY
05/1 3/09
114.8
NY
05/1 3/09
225
NY
05/1 3/09
236.7
NY
05/1 3/09
181.2
NY
05/1 3/09
36.1
NY
05/1 3/09
212.1
NY
05/1 3/09
47.8
NY
05/1 3/09
352.6
NY
05/1 3/09
128.5
NY
05/1 3/09
54.8
NY
05/1 3/09
60.6
NY
05/1 3/09
50.1
NY
05/1 3/09
48.2
NY
05/1 3/09
50
NY
05/1 3/09
46.4
NY
05/1 3/09
100.8
NY
05/1 3/09
53.2
NY
05/1 3/09
51.3
NY
05/1 3/09
49.9
NY
05/1 3/09
48.4
NY
05/1 3/09
47.5
NY
05/1 3/09
45.5
NY
05/1 3/09
43.2
NY
05/1 3/09
44.6
NY
05/1 3/09
38.7
NY
05/1 3/09
44.9
NY
05/14/09
16.9
NY
05/14/09
15.6
NY
05/14/09
68.5
NY
05/14/09
71.1
NY
05/14/09
104.3
NY
05/14/09
84
NY
05/14/09
91.8
NY
05/14/09
102
NY
05/14/09
65.3
NY
05/14/09
66.1
NY
05/14/09
102.7
NY
05/14/09
86.5
F-478

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/14/09
92.4
NY
05/14/09
90
NY
05/14/09
62.6
NY
05/14/09
62.4
NY
05/14/09
56.5
NY
05/14/09
60.2
NY
05/14/09
68.9
NY
05/14/09
69.5
NY
05/14/09
61.1
NY
05/14/09
63.8
NY
05/14/09
60.7
NY
05/14/09
78
NY
05/14/09
95.5
NY
05/14/09
111
NY
05/14/09
67.5
NY
05/14/09
65.4
NY
05/14/09
10.3
NY
05/15/09
16.3
NY
05/15/09
89.9
NY
05/15/09
88.7
NY
05/15/09
75.3
NY
05/15/09
68.3
NY
05/15/09
63.6
NY
05/15/09
60.9
NY
05/15/09
76.9
NY
05/15/09
17.1
NY
05/15/09
63.5
NY
05/15/09
59.5
NY
05/15/09
51.2
NY
05/15/09
46.3
NY
05/15/09
43.8
NY
05/15/09
46
NY
05/15/09
62.9
NY
05/15/09
58.4
NY
05/15/09
62.4
NY
05/15/09
63.6
NY
05/15/09
57.4
NY
05/15/09
54.7
NY
05/15/09
71.3
NY
05/15/09
67.7
NY
05/15/09
72.1
NY
05/15/09
60.8
NY
05/15/09
50.4
NY
05/15/09
32.2
NY
05/15/09
84.6
F-479

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/16/09
71.1
NY
05/16/09
70.2
NY
05/16/09
73.2
NY
05/16/09
33.2
NY
05/16/09
61.6
NY
05/16/09
64.1
NY
05/16/09
100.4
NY
05/16/09
95.6
NY
05/16/09
104.2
NY
05/16/09
28.7
NY
05/16/09
84.6
NY
05/16/09
87.5
NY
05/16/09
62.1
NY
05/16/09
46.9
NY
05/16/09
74.9
NY
05/16/09
64.1
NY
05/16/09
62.8
NY
05/16/09
88.5
NY
05/16/09
74.6
NY
05/16/09
73
NY
05/16/09
64.6
NY
05/16/09
63.4
NY
05/16/09
59
NY
05/16/09
78.6
NY
05/16/09
59
NY
05/16/09
58.6
NY
05/16/09
59.5
NY
05/16/09
60.8
NY
05/16/09
64.3
NY
05/16/09
100
NY
05/1 7/09
79.6
NY
05/1 7/09
76
NY
05/1 7/09
74
NY
05/1 7/09
78.9
NY
05/1 7/09
102.3
NY
05/1 7/09
86.5
NY
05/1 7/09
80.4
NY
05/1 7/09
72.2
NY
05/1 7/09
63.5
NY
05/1 7/09
60.8
NY
05/1 7/09
61.6
NY
05/1 7/09
59.5
NY
05/1 7/09
57.6
NY
05/1 7/09
75.6
NY
05/1 7/09
65.8
F-480

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/1 7/09
69.5
NY
05/1 7/09
70.6
NY
05/1 7/09
71.6
NY
05/1 7/09
62.1
NY
05/1 7/09
65.1
NY
05/1 7/09
92.5
NY
05/18/09
54.3
NY
05/18/09
71.5
NY
05/18/09
72.4
NY
05/18/09
64.8
NY
05/18/09
55.2
NY
05/18/09
57.2
NY
05/18/09
99.3
NY
05/18/09
62.2
NY
05/18/09
55.6
NY
05/18/09
55
NY
05/18/09
50.6
NY
05/18/09
49.9
NY
05/18/09
50.3
NY
05/18/09
52.8
NY
05/18/09
65.7
NY
05/18/09
55.1
NY
05/18/09
53.5
NY
05/18/09
54.5
NY
05/18/09
55.9
NY
05/18/09
55.6
NY
05/18/09
48.9
NY
05/18/09
51
NY
05/18/09
54.8
NY
05/18/09
79.1
NY
05/19/09
71.2
NY
05/19/09
64.1
NY
05/19/09
56.6
NY
05/19/09
51.7
NY
05/19/09
52.7
NY
05/19/09
117.4
NY
05/19/09
18.5
NY
05/19/09
50.9
NY
05/19/09
48.3
NY
05/19/09
47.3
NY
05/19/09
47.4
NY
05/19/09
47.3
NY
05/19/09
44
NY
05/19/09
44.4
NY
05/19/09
46.7
F-481

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/19/09
52.1
NY
05/19/09
100.7
NY
05/19/09
53.5
NY
05/19/09
50.5
NY
05/19/09
48.2
NY
05/19/09
52.5
NY
05/19/09
53.3
NY
05/19/09
49.3
NY
05/19/09
48.8
NY
05/19/09
51.2
NY
05/19/09
55.3
NY
05/19/09
78.8
NY
05/20/09
74.7
NY
05/20/09
74.2
NY
05/20/09
59.8
NY
05/20/09
54.3
NY
05/20/09
53.1
NY
05/20/09
56.9
NY
05/20/09
114
NY
05/20/09
53.5
NY
05/20/09
52.7
NY
05/20/09
51.2
NY
05/20/09
50.7
NY
05/20/09
50.6
NY
05/20/09
51.2
NY
05/20/09
50.1
NY
05/20/09
51.2
NY
05/20/09
64.2
NY
05/20/09
63.9
NY
05/20/09
63.5
NY
05/20/09
58.4
NY
05/20/09
57.4
NY
05/20/09
60.1
NY
05/20/09
58.9
NY
05/20/09
55.4
NY
05/20/09
55.5
NY
05/20/09
56.2
NY
05/20/09
69
NY
05/21/09
68.9
NY
05/21/09
65.1
NY
05/21/09
62.9
NY
05/21/09
63.3
NY
05/21/09
66.7
NY
05/21/09
77.3
NY
05/21/09
59.1
F-482

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/21/09
54.8
NY
05/21/09
52.5
NY
05/21/09
51.8
NY
05/21/09
51.4
NY
05/21/09
51.4
NY
05/21/09
53.4
NY
05/21/09
68.4
NY
05/21/09
57.9
NY
05/21/09
59.2
NY
05/21/09
55.4
NY
05/21/09
55
NY
05/21/09
54.8
NY
05/21/09
54.6
NY
05/21/09
55.2
NY
05/21/09
58.5
NY
05/21/09
74.8
NY
05/21/09
24.5
NY
05/22/09
79.6
NY
05/22/09
80.7
NY
05/22/09
81.2
NY
05/22/09
74.6
NY
05/22/09
94.7
NY
05/22/09
48.8
NY
05/22/09
87.5
NY
05/22/09
86.2
NY
05/22/09
83.9
NY
05/22/09
77.8
NY
05/22/09
70.6
NY
05/22/09
68.6
NY
05/22/09
69.9
NY
05/22/09
68.9
NY
05/22/09
102.9
NY
05/22/09
68.9
NY
05/22/09
65.6
NY
05/22/09
64.1
NY
05/22/09
65.5
NY
05/22/09
67.2
NY
05/22/09
68.1
NY
05/22/09
64.9
NY
05/22/09
62.6
NY
05/22/09
63.5
NY
05/22/09
65.1
NY
05/22/09
121.6
NY
05/23/09
199.4
NY
05/23/09
114.3
F-483

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/23/09
114.5
NY
05/23/09
108.1
NY
05/23/09
98
NY
05/23/09
93.2
NY
05/23/09
84.7
NY
05/23/09
75.5
NY
05/23/09
73.9
NY
05/23/09
75.2
NY
05/23/09
76.9
NY
05/23/09
83.2
NY
05/23/09
126.2
NY
05/23/09
89.9
NY
05/23/09
88
NY
05/23/09
79
NY
05/23/09
76.5
NY
05/23/09
73.8
NY
05/23/09
73.4
NY
05/23/09
73.4
NY
05/23/09
75.5
NY
05/23/09
84.7
NY
05/23/09
176.3
NY
05/24/09
152.7
NY
05/24/09
399
NY
05/24/09
44.8
NY
05/24/09
45
NY
05/24/09
43.8
NY
05/24/09
40.8
NY
05/24/09
38.7
NY
05/24/09
30.8
NY
05/24/09
25.4
NY
05/24/09
27.6
NY
05/24/09
28.6
NY
05/24/09
31.9
NY
05/24/09
37.1
NY
05/24/09
308
NY
05/24/09
41
NY
05/24/09
40.9
NY
05/24/09
41.7
NY
05/24/09
41.6
NY
05/24/09
43.8
NY
05/24/09
45.7
NY
05/24/09
46
NY
05/24/09
52.3
NY
05/24/09
9.8
NY
05/24/09
33.8
F-484

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/24/09
35.7
NY
05/24/09
32
NY
05/24/09
33.3
NY
05/24/09
36.9
NY
05/24/09
42.6
NY
05/24/09
60
NY
05/25/09
39.4
NY
05/25/09
36.3
NY
05/25/09
34.8
NY
05/25/09
28.9
NY
05/25/09
25
NY
05/25/09
25.7
NY
05/25/09
28.7
NY
05/25/09
28.3
NY
05/25/09
26.8
NY
05/25/09
26.2
NY
05/25/09
29.3
NY
05/25/09
48.9
NY
05/25/09
35.6
NY
05/25/09
33.9
NY
05/25/09
31.1
NY
05/25/09
29.4
NY
05/25/09
29.5
NY
05/25/09
32.1
NY
05/25/09
31
NY
05/25/09
28.6
NY
05/25/09
27.8
NY
05/25/09
26.3
NY
05/25/09
25.2
NY
05/25/09
25.5
NY
05/26/09
177.6
NY
05/26/09
126.8
NY
05/26/09
126.5
NY
05/26/09
119.4
NY
05/26/09
144.8
NY
05/26/09
116.9
NY
05/26/09
79.7
NY
05/26/09
78.4
NY
05/26/09
88.5
NY
05/26/09
144.6
NY
05/26/09
96.2
NY
05/26/09
94.7
NY
05/26/09
112.4
NY
05/26/09
127.8
NY
05/26/09
85.5
F-485

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/26/09
87.9
NY
05/26/09
98
NY
05/26/09
92.6
NY
05/26/09
130.8
NY
05/26/09
212.7
NY
05/26/09
47.3
NY
05/26/09
49.5
NY
05/26/09
42.9
NY
05/26/09
37.1
NY
05/26/09
31.8
NY
05/26/09
27.3
NY
05/26/09
37.3
NY
05/26/09
26.8
NY
05/26/09
26.4
NY
05/26/09
28
NY
05/26/09
36.5
NY
05/26/09
35.7
NY
05/26/09
19.6
NY
05/26/09
40.2
NY
05/26/09
24.5
NY
05/26/09
26.2
NY
05/26/09
25.4
NY
05/26/09
26.2
NY
05/26/09
22.9
NY
05/26/09
21.2
NY
05/26/09
21.8
NY
05/26/09
23.6
NY
05/26/09
29
NY
05/26/09
65.9
NY
05/26/09
131.2
NY
05/27/09
108.1
NY
05/27/09
112.8
NY
05/27/09
111.6
NY
05/27/09
115.6
NY
05/27/09
104.9
NY
05/27/09
138.2
NY
05/27/09
71.4
NY
05/27/09
64.8
NY
05/27/09
83.8
NY
05/27/09
73.2
NY
05/27/09
275
NY
05/27/09
31.8
NY
05/27/09
116.8
NY
05/27/09
106.4
NY
05/27/09
156.4
F-486

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/27/09
64.7
NY
05/27/09
198.4
NY
05/27/09
221.8
NY
05/27/09
196.9
NY
05/27/09
287.4
NY
05/27/09
197.7
NY
05/27/09
189.1
NY
05/27/09
213
NY
05/27/09
95.2
NY
05/27/09
110.3
NY
05/27/09
153.2
NY
05/27/09
76.8
NY
05/28/09
117.1
NY
05/28/09
130.9
NY
05/28/09
85.6
NY
05/28/09
82.1
NY
05/28/09
111.7
NY
05/28/09
77.4
NY
05/28/09
163.7
NY
05/28/09
74.7
NY
05/28/09
159.7
NY
05/28/09
138.5
NY
05/28/09
236.6
NY
05/28/09
86.5
NY
05/28/09
135.7
NY
05/28/09
183.7
NY
05/28/09
115.1
NY
05/28/09
105.4
NY
05/28/09
102.8
NY
05/28/09
157.7
NY
05/28/09
221.8
NY
05/28/09
228.1
NY
05/28/09
263.9
NY
05/28/09
106.5
NY
05/28/09
96
NY
05/28/09
88.6
NY
05/28/09
98.1
NY
05/28/09
91.3
NY
05/28/09
107.8
NY
05/28/09
71.2
NY
05/28/09
75.1
NY
05/28/09
105.7
NY
05/28/09
148.1
NY
05/28/09
161.5
NY
05/28/09
122.4
F-487

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/28/09
125.2
NY
05/28/09
173.9
NY
05/28/09
131.1
NY
05/28/09
131.2
NY
05/28/09
201.9
NY
05/28/09
140.7
NY
05/28/09
140.6
NY
05/28/09
169.2
NY
05/28/09
145.6
NY
05/28/09
190.3
NY
05/28/09
135.1
NY
05/28/09
156
NY
05/28/09
127.3
NY
05/28/09
153.7
NY
05/28/09
132.5
NY
05/28/09
119.6
NY
05/28/09
144.8
NY
05/28/09
123.7
NY
05/28/09
133.8
NY
05/28/09
139.1
NY
05/28/09
130.6
NY
05/28/09
403.3
NY
05/28/09
144.4
NY
05/28/09
156.3
NY
05/28/09
127
NY
05/28/09
85.6
NY
05/28/09
83.1
NY
05/28/09
113.2
NY
05/29/09
70.8
NY
05/29/09
72
NY
05/29/09
117.3
NY
05/29/09
68.3
NY
05/29/09
62
NY
05/29/09
48.9
NY
05/29/09
39.9
NY
05/29/09
69.6
NY
05/29/09
95.8
NY
05/29/09
100.2
NY
05/29/09
109.3
NY
05/29/09
67.3
NY
05/29/09
56.8
NY
05/29/09
56.6
NY
05/29/09
53.9
NY
05/29/09
52.7
NY
05/29/09
94.7
F-488

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/30/09
95.3
NY
05/30/09
101.8
NY
05/30/09
150.4
NY
05/30/09
113.9
NY
05/30/09
114.9
NY
05/30/09
115.3
NY
05/30/09
115.3
NY
05/30/09
113.1
NY
05/30/09
143.3
NY
05/30/09
111.8
NY
05/30/09
112.9
NY
05/30/09
111.8
NY
05/30/09
109.3
NY
05/30/09
103.2
NY
05/30/09
98.7
NY
05/30/09
94.5
NY
05/30/09
89.3
NY
05/30/09
87.9
NY
05/30/09
123.7
NY
05/30/09
91.4
NY
05/30/09
90.4
NY
05/30/09
87.4
NY
05/30/09
87.1
NY
05/30/09
94.8
NY
05/30/09
60
NY
05/30/09
51.3
NY
05/30/09
69.5
NY
05/30/09
77.3
NY
05/30/09
76.4
NY
05/31/09
108.5
NY
05/31/09
114.4
NY
05/31/09
169.3
NY
05/31/09
132.9
NY
05/31/09
129
NY
05/31/09
120.5
NY
05/31/09
112.4
NY
05/31/09
107
NY
05/31/09
98.6
NY
05/31/09
95.9
NY
05/31/09
96.6
NY
05/31/09
98
NY
05/31/09
193.7
NY
05/31/09
120.3
NY
05/31/09
117.4
NY
05/31/09
114.6
F-489

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
05/31/09
107.5
NY
05/31/09
99.2
NY
05/31/09
92.1
NY
05/31/09
93
NY
05/31/09
94.2
NY
05/31/09
93.3
NY
05/31/09
92
NY
06/01/09
151.8
NY
06/01/09
150.3
NY
06/01/09
147.1
NY
06/01/09
141.9
NY
06/01/09
136.3
NY
06/01/09
135.4
NY
06/01/09
136.9
NY
06/01/09
178.1
NY
06/01/09
124
NY
06/01/09
120.2
NY
06/01/09
116
NY
06/01/09
108.2
NY
06/01/09
104.1
NY
06/01/09
104
NY
06/01/09
104.2
NY
06/01/09
104.3
NY
06/01/09
105.6
NY
06/01/09
109.6
NY
06/01/09
135.6
NY
06/01/09
111.2
NY
06/01/09
108.4
NY
06/01/09
107.3
NY
06/01/09
107
NY
06/02/09
141.5
NY
06/02/09
140.6
NY
06/02/09
143.8
NY
06/02/09
137.2
NY
06/02/09
134.2
NY
06/02/09
131.6
NY
06/02/09
129.5
NY
06/02/09
127.4
NY
06/02/09
129.6
NY
06/02/09
132.5
NY
06/02/09
129.5
NY
06/02/09
123.6
NY
06/02/09
120.7
NY
06/02/09
120.9
NY
06/02/09
119.7
F-490

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/02/09
120.6
NY
06/02/09
124.5
NY
06/02/09
139.1
NY
06/03/09
157.4
NY
06/03/09
160
NY
06/03/09
169.6
NY
06/03/09
169.8
NY
06/03/09
168.7
NY
06/03/09
165.2
NY
06/03/09
164.7
NY
06/03/09
162.4
NY
06/03/09
157.3
NY
06/03/09
150.8
NY
06/03/09
150.8
NY
06/03/09
153.5
NY
06/03/09
177.6
NY
06/03/09
174.3
NY
06/03/09
172.4
NY
06/03/09
165.4
NY
06/03/09
153.5
NY
06/03/09
147.6
NY
06/03/09
143.7
NY
06/03/09
143
NY
06/03/09
143.7
NY
06/04/09
134.4
NY
06/04/09
139.9
NY
06/04/09
179.1
NY
06/04/09
161.4
NY
06/04/09
155.9
NY
06/04/09
152.7
NY
06/04/09
152.6
NY
06/04/09
152.2
NY
06/04/09
150.9
NY
06/04/09
155.7
NY
06/04/09
159
NY
06/04/09
166
NY
06/04/09
175.2
NY
06/04/09
174.9
NY
06/04/09
170.4
NY
06/04/09
161.8
NY
06/04/09
160.5
NY
06/04/09
158.5
NY
06/04/09
156.1
NY
06/04/09
154.5
NY
06/05/09
160.2
F-491

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/05/09
155.9
NY
06/05/09
149.3
NY
06/05/09
140.4
NY
06/05/09
139.5
NY
06/05/09
145.8
NY
06/05/09
155.9
NY
06/05/09
202
NY
06/05/09
226.1
NY
06/05/09
205.4
NY
06/05/09
145.2
NY
06/05/09
136.1
NY
06/05/09
130.7
NY
06/05/09
128.8
NY
06/05/09
130.1
NY
06/05/09
132.5
NY
06/06/09
40.7
NY
06/06/09
277.5
NY
06/06/09
46.5
NY
06/06/09
46.3
NY
06/06/09
46.3
NY
06/06/09
46.1
NY
06/06/09
44
NY
06/06/09
37.9
NY
06/06/09
36.7
NY
06/06/09
38.4
NY
06/06/09
41.4
NY
06/06/09
66.7
NY
06/06/09
39.8
NY
06/06/09
39.9
NY
06/06/09
40
NY
06/06/09
41.6
NY
06/06/09
45
NY
06/06/09
77.6
NY
06/06/09
7.4
NY
06/07/09
38.2
NY
06/07/09
42.5
NY
06/07/09
54.5
NY
06/07/09
57.5
NY
06/07/09
54.4
NY
06/07/09
51.2
NY
06/07/09
45.8
NY
06/07/09
43.8
NY
06/07/09
42.8
NY
06/07/09
43.7
NY
06/07/09
44.9
F-492

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/07/09
45.5
NY
06/07/09
54.3
NY
06/07/09
44.9
NY
06/07/09
45.1
NY
06/07/09
42.5
NY
06/07/09
39.3
NY
06/07/09
34.2
NY
06/07/09
32.7
NY
06/07/09
33.7
NY
06/07/09
35.5
NY
06/08/09
41.9
NY
06/08/09
45.4
NY
06/08/09
61.1
NY
06/08/09
57.7
NY
06/08/09
57.4
NY
06/08/09
55.5
NY
06/08/09
45.7
NY
06/08/09
38.2
NY
06/08/09
37.8
NY
06/08/09
40.5
NY
06/08/09
44.6
NY
06/08/09
45.8
NY
06/08/09
53.2
NY
06/08/09
46.5
NY
06/08/09
44.5
NY
06/08/09
36.3
NY
06/08/09
35.2
NY
06/08/09
35.8
NY
06/09/09
59.4
NY
06/09/09
55.4
NY
06/09/09
43.2
NY
06/09/09
11.3
NY
06/09/09
127.8
NY
06/09/09
103.8
NY
06/09/09
81.5
NY
06/09/09
85.5
NY
06/09/09
87.4
NY
06/09/09
97.3
NY
06/09/09
72.2
NY
06/09/09
68
NY
06/09/09
55
NY
06/09/09
43.8
NY
06/09/09
52.7
NY
06/09/09
45.8
NY
06/09/09
86
F-493

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/09/09
21.8
NY
06/09/09
110.4
NY
06/09/09
108.9
NY
06/09/09
102.9
NY
06/09/09
115.1
NY
06/09/09
103.1
NY
06/09/09
33.2
NY
06/09/09
39.3
NY
06/09/09
40.2
NY
06/09/09
40.1
NY
06/09/09
39.9
NY
06/09/09
38.7
NY
06/09/09
37.3
NY
06/09/09
38.6
NY
06/10/09
105.8
NY
06/10/09
136.4
NY
06/10/09
38.3
NY
06/10/09
35.6
NY
06/10/09
149.5
NY
06/10/09
100.4
NY
06/10/09
60.6
NY
06/10/09
54.1
NY
06/10/09
39.9
NY
06/10/09
40.4
NY
06/10/09
40.9
NY
06/10/09
40.3
NY
06/10/09
46.8
NY
06/10/09
48.3
NY
06/10/09
78.4
NY
06/10/09
8.9
NY
06/10/09
45.4
NY
06/10/09
52
NY
06/10/09
56.3
NY
06/10/09
52.9
NY
06/10/09
47.4
NY
06/10/09
49.1
NY
06/10/09
48.4
NY
06/10/09
46.2
NY
06/10/09
47.2
NY
06/10/09
50.2
NY
06/10/09
50.2
NY
06/11/09
341.7
NY
06/11/09
341.1
NY
06/11/09
397.1
NY
06/11/09
9.3
F-494

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/11/09
50.5
NY
06/11/09
50.2
NY
06/11/09
45.8
NY
06/11/09
53.9
NY
06/11/09
34.2
NY
06/11/09
46.3
NY
06/11/09
46.5
NY
06/11/09
41.8
NY
06/11/09
38.4
NY
06/11/09
40.1
NY
06/11/09
38.2
NY
06/11/09
41.8
NY
06/11/09
43.3
NY
06/11/09
49.8
NY
06/11/09
65.2
NY
06/11/09
63.6
NY
06/11/09
61.7
NY
06/11/09
71
NY
06/11/09
93.3
NY
06/1 2/09
119.4
NY
06/1 2/09
132.3
NY
06/1 2/09
151.4
NY
06/1 2/09
61.1
NY
06/1 2/09
300.1
NY
06/1 2/09
176.8
NY
06/1 2/09
141.3
NY
06/1 2/09
145.1
NY
06/1 2/09
123.4
NY
06/1 2/09
129.1
NY
06/1 2/09
135.3
NY
06/1 2/09
130.3
NY
06/1 2/09
119.8
NY
06/1 2/09
110.7
NY
06/1 2/09
74.7
NY
06/1 2/09
105.9
NY
06/1 2/09
111
NY
06/1 2/09
118.6
NY
06/1 2/09
104.4
NY
06/1 2/09
108.8
NY
06/1 2/09
55.3
NY
06/1 2/09
77.4
NY
06/1 2/09
73.1
NY
06/1 2/09
100.3
NY
06/1 2/09
99.4
NY
06/1 2/09
60.4
F-495

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/1 2/09
59.7
NY
06/1 2/09
40.2
NY
06/1 2/09
91.9
NY
06/1 2/09
100.2
NY
06/1 2/09
30.4
NY
06/1 2/09
66.4
NY
06/1 2/09
35.7
NY
06/1 2/09
73.1
NY
06/1 2/09
91.4
NY
06/1 2/09
40.7
NY
06/1 2/09
141.2
NY
06/1 2/09
138.1
NY
06/1 2/09
105.5
NY
06/1 2/09
158.1
NY
06/1 2/09
86.3
NY
06/1 2/09
193.9
NY
06/1 2/09
352.9
NY
06/1 2/09
291.9
NY
06/1 2/09
250.5
NY
06/1 2/09
197.9
NY
06/1 2/09
169
NY
06/1 2/09
157.9
NY
06/1 2/09
267.2
NY
06/1 2/09
327.7
NY
06/1 3/09
99.6
NY
06/1 3/09
242
NY
06/1 3/09
133.6
NY
06/1 3/09
83.8
NY
06/1 3/09
85.7
NY
06/1 3/09
79.5
NY
06/1 3/09
62.4
NY
06/1 3/09
76.9
NY
06/1 3/09
75.6
NY
06/1 3/09
65.2
NY
06/1 3/09
52.2
NY
06/1 3/09
66.8
NY
06/1 3/09
52.3
NY
06/1 3/09
106.1
NY
06/1 3/09
152
NY
06/1 3/09
79.3
NY
06/1 3/09
102.9
NY
06/1 3/09
31.7
NY
06/1 3/09
37.8
NY
06/1 3/09
39.2
NY
06/1 3/09
120.6
F-496

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/1 3/09
73.9
NY
06/1 3/09
129
NY
06/1 3/09
132.3
NY
06/1 3/09
171.3
NY
06/1 3/09
210.6
NY
06/1 3/09
218.4
NY
06/1 3/09
247.2
NY
06/1 3/09
201.9
NY
06/1 3/09
160.1
NY
06/1 3/09
172.4
NY
06/14/09
13
NY
06/14/09
67.6
NY
06/14/09
76.7
NY
06/14/09
73.2
NY
06/14/09
74.9
NY
06/14/09
73.3
NY
06/14/09
73
NY
06/14/09
76.2
NY
06/14/09
76.1
NY
06/14/09
114.7
NY
06/14/09
99.6
NY
06/14/09
87.6
NY
06/14/09
81.7
NY
06/14/09
79.2
NY
06/14/09
93.1
NY
06/14/09
98.9
NY
06/14/09
57.9
NY
06/14/09
48.8
NY
06/14/09
87.8
NY
06/14/09
181.6
NY
06/14/09
123.2
NY
06/14/09
132.9
NY
06/14/09
247.3
NY
06/14/09
123.6
NY
06/14/09
88.9
NY
06/15/09
84
NY
06/15/09
80.3
NY
06/15/09
123.5
NY
06/15/09
65.3
NY
06/15/09
64
NY
06/15/09
59.7
NY
06/15/09
59.6
NY
06/15/09
64.4
NY
06/15/09
40.6
NY
06/15/09
50.1
F-497

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/15/09
51.7
NY
06/15/09
48.3
NY
06/15/09
42.3
NY
06/15/09
43.7
NY
06/15/09
51.4
NY
06/15/09
61.9
NY
06/15/09
97.6
NY
06/15/09
56.7
NY
06/15/09
57.1
NY
06/15/09
59.1
NY
06/15/09
60.4
NY
06/15/09
52.2
NY
06/15/09
55.7
NY
06/15/09
92.1
NY
06/16/09
98
NY
06/16/09
79.6
NY
06/16/09
72.6
NY
06/16/09
82.1
NY
06/16/09
66.5
NY
06/16/09
69.7
NY
06/16/09
69.2
NY
06/16/09
65.8
NY
06/16/09
67.9
NY
06/16/09
84.3
NY
06/16/09
102.2
NY
06/16/09
420.3
NY
06/16/09
104.4
NY
06/16/09
90.8
NY
06/16/09
89.4
NY
06/16/09
85.4
NY
06/16/09
81.4
NY
06/16/09
84.2
NY
06/1 7/09
152.7
NY
06/1 7/09
144.7
NY
06/1 7/09
145.9
NY
06/1 7/09
142.4
NY
06/1 7/09
CO
CO
CO
NY
06/1 7/09
109
NY
06/1 7/09
98.9
NY
06/1 7/09
97.1
NY
06/1 7/09
73.5
NY
06/1 7/09
68.9
NY
06/1 7/09
62.7
NY
06/1 7/09
58.7
NY
06/1 7/09
58.7
F-498

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/1 7/09
61.2
NY
06/1 7/09
67.2
NY
06/1 7/09
76.7
NY
06/1 7/09
70.8
NY
06/1 7/09
72.1
NY
06/1 7/09
72
NY
06/1 7/09
67.8
NY
06/1 7/09
73.8
NY
06/1 7/09
103
NY
06/1 7/09
219.3
NY
06/18/09
69
NY
06/18/09
52.9
NY
06/18/09
48.4
NY
06/18/09
121.5
NY
06/18/09
99.3
NY
06/18/09
101.8
NY
06/18/09
98.5
NY
06/18/09
104.6
NY
06/18/09
110.1
NY
06/18/09
119.1
NY
06/18/09
96.7
NY
06/18/09
97.1
NY
06/18/09
102.8
NY
06/18/09
106
NY
06/18/09
113.7
NY
06/18/09
194.5
NY
06/18/09
185.1
NY
06/18/09
169.3
NY
06/18/09
167.5
NY
06/18/09
163.9
NY
06/18/09
174
NY
06/18/09
202.1
NY
06/18/09
165.9
NY
06/18/09
97.7
NY
06/18/09
314.7
NY
06/18/09
197.3
NY
06/18/09
168.8
NY
06/18/09
165.7
NY
06/18/09
157.2
NY
06/18/09
156.5
NY
06/18/09
154.6
NY
06/18/09
150.2
NY
06/18/09
148.1
NY
06/18/09
152.9
NY
06/18/09
163
F-499

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/19/09
67.2
NY
06/19/09
62.5
NY
06/19/09
53.3
NY
06/19/09
58.7
NY
06/19/09
170.7
NY
06/19/09
54.7
NY
06/19/09
54.8
NY
06/19/09
50.5
NY
06/19/09
43.8
NY
06/19/09
41.3
NY
06/19/09
41.4
NY
06/19/09
43.4
NY
06/19/09
54.5
NY
06/19/09
58.3
NY
06/19/09
58.2
NY
06/19/09
51.9
NY
06/19/09
53.3
NY
06/19/09
56.5
NY
06/19/09
51.4
NY
06/19/09
45.5
NY
06/19/09
49.2
NY
06/19/09
55.9
NY
06/20/09
108.6
NY
06/20/09
110.3
NY
06/20/09
76.9
NY
06/20/09
90.4
NY
06/20/09
96.5
NY
06/20/09
128.9
NY
06/20/09
155.2
NY
06/20/09
109.7
NY
06/20/09
112.7
NY
06/20/09
111.7
NY
06/20/09
110.5
NY
06/20/09
121
NY
06/20/09
104.5
NY
06/20/09
104.5
NY
06/20/09
114.9
NY
06/20/09
95.7
NY
06/20/09
94.6
NY
06/20/09
95.2
NY
06/20/09
96.5
NY
06/20/09
112.1
NY
06/20/09
124.6
NY
06/20/09
93.3
NY
06/20/09
96.9
F-500

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/20/09
107.5
NY
06/20/09
120.5
NY
06/20/09
121.3
NY
06/20/09
90.8
NY
06/20/09
100.9
NY
06/20/09
115.4
NY
06/20/09
126.7
NY
06/20/09
89.2
NY
06/20/09
89.4
NY
06/20/09
64.6
NY
06/20/09
109.7
NY
06/20/09
118.2
NY
06/20/09
114
NY
06/20/09
85.4
NY
06/20/09
83.6
NY
06/20/09
80.2
NY
06/20/09
92.3
NY
06/20/09
126.2
NY
06/20/09
132.9
NY
06/20/09
192.8
NY
06/20/09
141.9
NY
06/20/09
89.4
NY
06/20/09
108.6
NY
06/20/09
65.5
NY
06/20/09
168.8
NY
06/20/09
350.5
NY
06/20/09
199.4
NY
06/20/09
518.5
NY
06/20/09
277.7
NY
06/20/09
71.8
NY
06/20/09
76.3
NY
06/20/09
21
NY
06/20/09
59.8
NY
06/20/09
72.6
NY
06/20/09
59.1
NY
06/20/09
60
NY
06/20/09
66.5
NY
06/20/09
59.8
NY
06/20/09
154.1
NY
06/21/09
112.3
NY
06/21/09
118.3
NY
06/21/09
144.3
NY
06/21/09
98.3
NY
06/21/09
125.9
NY
06/21/09
99.4
F-501

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/21/09
64.2
NY
06/21/09
134.8
NY
06/21/09
267
NY
06/21/09
125.3
NY
06/21/09
138
NY
06/21/09
141.8
NY
06/21/09
153.6
NY
06/21/09
107.3
NY
06/21/09
120.7
NY
06/21/09
135.8
NY
06/21/09
122.4
NY
06/21/09
284.8
NY
06/21/09
77.3
NY
06/21/09
104.8
NY
06/21/09
100.3
NY
06/21/09
80.2
NY
06/21/09
129.8
NY
06/21/09
89
NY
06/21/09
147.1
NY
06/21/09
99.9
NY
06/21/09
100.4
NY
06/21/09
80.1
NY
06/21/09
110.3
NY
06/21/09
111.1
NY
06/21/09
125.7
NY
06/21/09
128.7
NY
06/21/09
99.9
NY
06/21/09
99.4
NY
06/22/09
44.1
NY
06/22/09
45.4
NY
06/22/09
54.6
NY
06/22/09
303.4
NY
06/22/09
83.4
NY
06/22/09
124.7
NY
06/22/09
74.3
NY
06/22/09
62.4
NY
06/22/09
57.8
NY
06/22/09
106.5
NY
06/22/09
102.2
NY
06/22/09
78.3
NY
06/22/09
35.4
NY
06/22/09
35.2
NY
06/22/09
42.6
NY
06/22/09
49
NY
06/22/09
80.7
F-502

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/22/09
152.3
NY
06/22/09
151.5
NY
06/22/09
211.7
NY
06/22/09
227.8
NY
06/22/09
193.6
NY
06/22/09
180.3
NY
06/22/09
134
NY
06/22/09
120.9
NY
06/22/09
174.4
NY
06/22/09
227.7
NY
06/22/09
129.9
NY
06/22/09
130.5
NY
06/22/09
720.9
NY
06/22/09
5.5
NY
06/23/09
36.7
NY
06/23/09
35.1
NY
06/23/09
30.2
NY
06/23/09
70.1
NY
06/23/09
66.7
NY
06/23/09
51.4
NY
06/23/09
41.9
NY
06/23/09
42.4
NY
06/23/09
99
NY
06/23/09
103
NY
06/23/09
102.9
NY
06/23/09
111.6
NY
06/23/09
84.8
NY
06/23/09
88.1
NY
06/23/09
121.3
NY
06/23/09
261.5
NY
06/23/09
83.5
NY
06/23/09
67.4
NY
06/23/09
59.4
NY
06/23/09
37.9
NY
06/23/09
37
NY
06/23/09
78.5
NY
06/24/09
42
NY
06/24/09
35.4
NY
06/24/09
37.6
NY
06/24/09
33
NY
06/24/09
225.1
NY
06/24/09
45.4
NY
06/24/09
45
NY
06/24/09
43.6
NY
06/24/09
40.3
F-503

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/24/09
34.8
NY
06/24/09
41.8
NY
06/24/09
390.4
NY
06/24/09
47.8
NY
06/24/09
38.2
NY
06/25/09
121.5
NY
06/25/09
102
NY
06/25/09
20.4
NY
06/25/09
9.3
NY
06/25/09
31.1
NY
06/25/09
389.2
NY
06/25/09
427.7
NY
06/25/09
5
NY
06/25/09
76.9
NY
06/25/09
489.8
NY
06/25/09
493.7
NY
06/25/09
249.8
NY
06/25/09
134.7
NY
06/25/09
253.5
NY
06/25/09
645.9
NY
06/25/09
82.8
NY
06/25/09
97.3
NY
06/25/09
62.8
NY
06/25/09
52.4
NY
06/25/09
57.9
NY
06/25/09
72.7
NY
06/25/09
207.8
NY
06/25/09
59.9
NY
06/25/09
46
NY
06/25/09
46
NY
06/25/09
42.3
NY
06/25/09
41.5
NY
06/25/09
40.3
NY
06/25/09
114.9
NY
06/25/09
55.8
NY
06/25/09
39.3
NY
06/25/09
36.9
NY
06/25/09
33.6
NY
06/25/09
30.8
NY
06/25/09
33.5
NY
06/25/09
174.4
NY
06/26/09
39.9
NY
06/26/09
243.7
NY
06/26/09
139.7
NY
06/26/09
136.4
F-504

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/26/09
112.8
NY
06/26/09
75.1
NY
06/26/09
294
NY
06/26/09
119.6
NY
06/26/09
96.3
NY
06/26/09
91.1
NY
06/26/09
93.6
NY
06/26/09
61.2
NY
06/26/09
111.8
NY
06/26/09
120
NY
06/26/09
50.9
NY
06/26/09
77.7
NY
06/26/09
51.9
NY
06/26/09
103.7
NY
06/26/09
91.2
NY
06/26/09
57.9
NY
06/26/09
41.6
NY
06/26/09
66.6
NY
06/26/09
43.3
NY
06/26/09
114.9
NY
06/26/09
107.7
NY
06/26/09
32.2
NY
06/26/09
73
NY
06/26/09
24.8
NY
06/26/09
64
NY
06/26/09
67.1
NY
06/26/09
85.5
NY
06/26/09
74.6
NY
06/26/09
128.6
NY
06/26/09
30.3
NY
06/26/09
146.2
NY
06/26/09
114.9
NY
06/26/09
223.3
NY
06/26/09
182.2
NY
06/26/09
374.1
NY
06/26/09
271.1
NY
06/26/09
358.4
NY
06/26/09
192
NY
06/26/09
129.5
NY
06/26/09
109.2
NY
06/26/09
89.2
NY
06/26/09
95.7
NY
06/26/09
311.6
NY
06/26/09
119.1
NY
06/26/09
132.9
F-505

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/26/09
191.3
NY
06/26/09
184.4
NY
06/26/09
175.8
NY
06/26/09
183.4
NY
06/26/09
158.7
NY
06/26/09
138.7
NY
06/26/09
77.5
NY
06/26/09
96
NY
06/26/09
121.8
NY
06/26/09
116.3
NY
06/26/09
145.5
NY
06/26/09
51.2
NY
06/26/09
70.4
NY
06/26/09
65.6
NY
06/26/09
218.2
NY
06/26/09
55
NY
06/26/09
129.1
NY
06/26/09
109.1
NY
06/26/09
84.2
NY
06/26/09
67.5
NY
06/26/09
61.2
NY
06/26/09
40.9
NY
06/26/09
80
NY
06/26/09
63.3
NY
06/26/09
171.1
NY
06/26/09
91.7
NY
06/26/09
411.5
NY
06/26/09
298.5
NY
06/26/09
132.2
NY
06/27/09
112.6
NY
06/27/09
116.9
NY
06/27/09
119.5
NY
06/27/09
119.5
NY
06/27/09
335.2
NY
06/27/09
65.5
NY
06/27/09
68.8
NY
06/27/09
173.6
NY
06/27/09
103.9
NY
06/27/09
150.8
NY
06/27/09
97.1
NY
06/27/09
30.2
NY
06/27/09
119.3
NY
06/27/09
94.2
NY
06/27/09
134.9
NY
06/27/09
65.3
F-506

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/27/09
107
NY
06/27/09
56.4
NY
06/27/09
54.3
NY
06/27/09
74.4
NY
06/27/09
119.5
NY
06/27/09
128.2
NY
06/27/09
128.9
NY
06/27/09
371.1
NY
06/27/09
470
NY
06/27/09
314
NY
06/27/09
132.2
NY
06/27/09
109
NY
06/27/09
141.6
NY
06/27/09
141.3
NY
06/27/09
99.9
NY
06/27/09
196.6
NY
06/27/09
71.9
NY
06/27/09
183.1
NY
06/28/09
145.9
NY
06/28/09
191.2
NY
06/28/09
151.2
NY
06/28/09
157.9
NY
06/28/09
133.7
NY
06/28/09
125.1
NY
06/28/09
137.2
NY
06/28/09
82.3
NY
06/28/09
106.7
NY
06/28/09
33.2
NY
06/28/09
102.6
NY
06/28/09
109.2
NY
06/28/09
106.9
NY
06/28/09
79.9
NY
06/28/09
177.5
NY
06/28/09
94.2
NY
06/28/09
113
NY
06/28/09
120.4
NY
06/28/09
169.7
NY
06/28/09
103.8
NY
06/28/09
110.6
NY
06/28/09
212.8
NY
06/28/09
103.7
NY
06/28/09
82.1
NY
06/28/09
150.3
NY
06/28/09
91.7
NY
06/28/09
211.1
F-507

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/28/09
163.9
NY
06/28/09
147.3
NY
06/28/09
127.2
NY
06/28/09
138
NY
06/28/09
113.6
NY
06/28/09
101.7
NY
06/28/09
61.4
NY
06/28/09
95.8
NY
06/28/09
107.9
NY
06/28/09
91.9
NY
06/28/09
26.2
NY
06/28/09
48.5
NY
06/28/09
110.8
NY
06/29/09
172.2
NY
06/29/09
127.3
NY
06/29/09
100.8
NY
06/29/09
134.5
NY
06/29/09
116.3
NY
06/29/09
116.4
NY
06/29/09
114
NY
06/29/09
92.6
NY
06/29/09
106.6
NY
06/29/09
181.5
NY
06/29/09
758.7
NY
06/29/09
64.9
NY
06/29/09
112
NY
06/29/09
90.3
NY
06/29/09
95.5
NY
06/29/09
54.9
NY
06/29/09
91.6
NY
06/29/09
141.4
NY
06/29/09
61.7
NY
06/29/09
77.9
NY
06/29/09
99.5
NY
06/29/09
291.1
NY
06/29/09
230.9
NY
06/29/09
148.4
NY
06/29/09
106.9
NY
06/29/09
61.6
NY
06/29/09
160.3
NY
06/29/09
97.3
NY
06/29/09
63.6
NY
06/29/09
59
NY
06/29/09
50.7
NY
06/29/09
118.7
F-508

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/29/09
66.4
NY
06/29/09
84.5
NY
06/29/09
76.8
NY
06/29/09
82.9
NY
06/29/09
77.6
NY
06/29/09
66
NY
06/29/09
142.1
NY
06/29/09
221.8
NY
06/29/09
51.6
NY
06/29/09
185.7
NY
06/29/09
195
NY
06/29/09
163.3
NY
06/29/09
170.1
NY
06/29/09
167.6
NY
06/29/09
167.2
NY
06/29/09
204.8
NY
06/29/09
50.7
NY
06/30/09
50.2
NY
06/30/09
103
NY
06/30/09
114.5
NY
06/30/09
90.9
NY
06/30/09
79.4
NY
06/30/09
119.9
NY
06/30/09
51.2
NY
06/30/09
95.4
NY
06/30/09
122.9
NY
06/30/09
163
NY
06/30/09
104.1
NY
06/30/09
145.1
NY
06/30/09
100
NY
06/30/09
86.9
NY
06/30/09
60.1
NY
06/30/09
72.8
NY
06/30/09
95
NY
06/30/09
85.4
NY
06/30/09
99.4
NY
06/30/09
98.4
NY
06/30/09
215.1
NY
06/30/09
144.7
NY
06/30/09
108.7
NY
06/30/09
163.2
NY
06/30/09
68.2
NY
06/30/09
103.5
NY
06/30/09
60.5
NY
06/30/09
172.1
F-509

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
06/30/09
105.4
NY
06/30/09
167.6
NY
06/30/09
129.7
NY
06/30/09
82.4
NY
06/30/09
112.1
NY
06/30/09
70.7
NY
06/30/09
136.3
NY
06/30/09
118.5
NY
06/30/09
167.5
NY
06/30/09
214.1
NY
06/30/09
146.2
NY
06/30/09
130.7
NY
06/30/09
194
NY
06/30/09
68.1
NY
06/30/09
95.7
NY
06/30/09
99.5
NY
06/30/09
107.2
NY
06/30/09
83
NY
06/30/09
67.8
NY
06/30/09
84.5
NY
06/30/09
93.4
NY
06/30/09
90.9
NY
06/30/09
77.6
NY
06/30/09
40.1
NY
06/30/09
106.5
NY
06/30/09
75.7
NY
06/30/09
34.4
NY
06/30/09
90.8
NY
06/30/09
111.6
NY
06/30/09
93.9
NY
06/30/09
58.9
NY
06/30/09
57.5
NY
06/30/09
71
NY
06/30/09
64.5
NY
06/30/09
58.2
NY
06/30/09
71.4
NY
06/30/09
74.8
NY
06/30/09
193.2
NY
06/30/09
202.8
NY
06/30/09
455.9
NY
06/30/09
87.6
NY
06/30/09
125.2
NY
06/30/09
190.8
NY
06/30/09
636.3
NY
07/01/09
56
F-510

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/01/09
88.9
NY
07/01/09
99.6
NY
07/01/09
113.6
NY
07/01/09
59.2
NY
07/01/09
110.6
NY
07/01/09
125.9
NY
07/01/09
116.2
NY
07/01/09
55.6
NY
07/01/09
63.9
NY
07/01/09
101.5
NY
07/01/09
414.1
NY
07/01/09
134.6
NY
07/01/09
148.1
NY
07/01/09
112.7
NY
07/01/09
99.6
NY
07/01/09
206.7
NY
07/01/09
135.4
NY
07/01/09
132.7
NY
07/01/09
161.3
NY
07/01/09
103.6
NY
07/01/09
82.4
NY
07/01/09
77
NY
07/01/09
106.6
NY
07/01/09
104.4
NY
07/01/09
104.2
NY
07/01/09
111
NY
07/01/09
112.1
NY
07/01/09
78.3
NY
07/01/09
71.3
NY
07/01/09
42.9
NY
07/01/09
192.3
NY
07/02/09
114.5
NY
07/02/09
74.8
NY
07/02/09
84.2
NY
07/02/09
79.7
NY
07/02/09
65.3
NY
07/02/09
95.4
NY
07/02/09
48.9
NY
07/02/09
46.5
NY
07/02/09
88.2
NY
07/02/09
83.7
NY
07/02/09
86.4
NY
07/02/09
49.8
NY
07/02/09
79.2
NY
07/02/09
53.2
F-511

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/02/09
101.4
NY
07/02/09
41.8
NY
07/02/09
53.7
NY
07/02/09
198.6
NY
07/02/09
273.7
NY
07/02/09
96.3
NY
07/02/09
119.7
NY
07/02/09
86
NY
07/02/09
126.5
NY
07/02/09
62.1
NY
07/02/09
130.2
NY
07/02/09
60.7
NY
07/02/09
43
NY
07/02/09
50.3
NY
07/02/09
107
NY
07/02/09
109.5
NY
07/02/09
103.8
NY
07/02/09
56.1
NY
07/02/09
99.1
NY
07/02/09
113.4
NY
07/02/09
119.2
NY
07/02/09
129.6
NY
07/02/09
107
NY
07/02/09
80.5
NY
07/02/09
116.5
NY
07/02/09
87.3
NY
07/03/09
133.9
NY
07/03/09
95.4
NY
07/03/09
168.3
NY
07/03/09
279.9
NY
07/03/09
101.3
NY
07/03/09
58.1
NY
07/03/09
61.7
NY
07/03/09
80.6
NY
07/03/09
123.8
NY
07/03/09
143.6
NY
07/03/09
182.7
NY
07/03/09
168.2
NY
07/03/09
216.2
NY
07/03/09
209.9
NY
07/03/09
228.6
NY
07/03/09
430.4
NY
07/03/09
231.2
NY
07/03/09
200.6
NY
07/03/09
68.9
F-512

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/03/09
125.7
NY
07/03/09
176.1
NY
07/03/09
112
NY
07/03/09
74.6
NY
07/03/09
49.1
NY
07/03/09
86.2
NY
07/03/09
81.3
NY
07/03/09
95.7
NY
07/03/09
82.1
NY
07/03/09
77.9
NY
07/03/09
84
NY
07/03/09
105.4
NY
07/03/09
108
NY
07/03/09
131.8
NY
07/03/09
101.3
NY
07/03/09
124.4
NY
07/03/09
225.9
NY
07/03/09
502.4
NY
07/03/09
235.5
NY
07/03/09
368.3
NY
07/03/09
301.4
NY
07/03/09
169.2
NY
07/03/09
188
NY
07/03/09
359
NY
07/03/09
586.8
NY
07/03/09
389.4
NY
07/03/09
241.5
NY
07/03/09
199.2
NY
07/04/09
141.3
NY
07/04/09
156.7
NY
07/04/09
12.7
NY
07/05/09
79.8
NY
07/05/09
81.2
NY
07/06/09
2.5
NY
07/07/09
46.6
NY
07/07/09
46.1
NY
07/07/09
52.5
NY
07/07/09
43.5
NY
07/07/09
35.5
NY
07/07/09
77.8
NY
07/07/09
40.1
NY
07/08/09
132.5
NY
07/08/09
122.2
NY
07/08/09
95.5
NY
07/08/09
81.1
F-513

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/08/09
112.7
NY
07/08/09
116.5
NY
07/08/09
112.7
NY
07/08/09
146.9
NY
07/08/09
132.6
NY
07/08/09
14.2
NY
07/08/09
1.6
NY
07/08/09
29.8
NY
07/08/09
74.4
NY
07/08/09
33.8
NY
07/08/09
34.4
NY
07/08/09
39.4
NY
07/08/09
36.7
NY
07/08/09
80
NY
07/08/09
11.7
NY
07/08/09
54.5
NY
07/08/09
50.7
NY
07/08/09
45.7
NY
07/08/09
44.4
NY
07/08/09
51.5
NY
07/08/09
49.9
NY
07/08/09
34.5
NY
07/08/09
46.8
NY
07/08/09
3.4
NY
07/09/09
86.8
NY
07/09/09
87
NY
07/09/09
167.4
NY
07/09/09
44.1
NY
07/09/09
37.1
NY
07/09/09
117.4
NY
07/09/09
136.5
NY
07/09/09
128.3
NY
07/09/09
131.1
NY
07/09/09
134.1
NY
07/09/09
138.9
NY
07/09/09
155.3
NY
07/09/09
149.9
NY
07/09/09
151.8
NY
07/09/09
172
NY
07/09/09
254.2
NY
07/09/09
209.7
NY
07/09/09
170.6
NY
07/09/09
198.3
NY
07/09/09
345.7
NY
07/09/09
237.7
F-514

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/09/09
59.3
NY
07/09/09
56.9
NY
07/09/09
80.1
NY
07/09/09
157.6
NY
07/09/09
40.2
NY
07/09/09
45.6
NY
07/09/09
52.9
NY
07/09/09
98.4
NY
07/09/09
17.7
NY
07/09/09
147.5
NY
07/09/09
146
NY
07/09/09
132.9
NY
07/09/09
123
NY
07/09/09
111.7
NY
07/10/09
50.8
NY
07/10/09
40.7
NY
07/10/09
53.9
NY
07/10/09
45.3
NY
07/10/09
181.7
NY
07/10/09
47.8
NY
07/10/09
46.4
NY
07/10/09
41.5
NY
07/10/09
85.2
NY
07/10/09
45.1
NY
07/10/09
45.5
NY
07/10/09
49.6
NY
07/10/09
56.8
NY
07/10/09
41
NY
07/10/09
40.9
NY
07/10/09
30.5
NY
07/10/09
34.4
NY
07/10/09
122.7
NY
07/10/09
58.2
NY
07/10/09
52
NY
07/10/09
48.3
NY
07/10/09
49.9
NY
07/10/09
95.8
NY
07/11/09
400.4
NY
07/11/09
273.2
NY
07/11/09
659.3
NY
07/11/09
285.8
NY
07/11/09
261.2
NY
07/11/09
122.6
NY
07/11/09
213.8
NY
07/11/09
504.5
F-515

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/11/09
134.9
NY
07/11/09
39.2
NY
07/11/09
34.7
NY
07/11/09
33.8
NY
07/11/09
29.3
NY
07/11/09
34.2
NY
07/11/09
106.8
NY
07/11/09
41
NY
07/11/09
37.1
NY
07/11/09
34.2
NY
07/11/09
32.6
NY
07/11/09
32.8
NY
07/11/09
38
NY
07/1 2/09
137.7
NY
07/1 2/09
133.6
NY
07/1 2/09
108.7
NY
07/1 2/09
152.2
NY
07/1 2/09
97.8
NY
07/1 2/09
87.6
NY
07/1 2/09
150.6
NY
07/1 2/09
118.4
NY
07/1 2/09
88.2
NY
07/1 2/09
50.4
NY
07/1 2/09
139.9
NY
07/1 2/09
80.5
NY
07/1 2/09
90.4
NY
07/1 2/09
120.7
NY
07/1 2/09
73.7
NY
07/1 2/09
86.1
NY
07/1 2/09
82.1
NY
07/1 2/09
85.8
NY
07/1 2/09
75.9
NY
07/1 2/09
47.2
NY
07/1 2/09
91.8
NY
07/1 2/09
52
NY
07/1 2/09
64.3
NY
07/1 2/09
285
NY
07/1 2/09
438.6
NY
07/1 2/09
85.2
NY
07/1 2/09
92.1
NY
07/1 2/09
105.3
NY
07/1 2/09
89.3
NY
07/1 2/09
99.8
NY
07/1 2/09
61.6
NY
07/1 2/09
89.5
F-516

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/1 2/09
124
NY
07/1 2/09
73.5
NY
07/1 2/09
73
NY
07/1 2/09
46.3
NY
07/1 2/09
109.2
NY
07/1 2/09
124.7
NY
07/1 2/09
20.1
NY
07/1 2/09
42
NY
07/1 2/09
153.1
NY
07/1 2/09
9.5
NY
07/1 3/09
105.4
NY
07/1 3/09
111.4
NY
07/1 3/09
121.1
NY
07/1 3/09
97.2
NY
07/1 3/09
93.5
NY
07/1 3/09
89.2
NY
07/1 3/09
84.5
NY
07/1 3/09
92.2
NY
07/1 3/09
89.8
NY
07/1 3/09
54.4
NY
07/1 3/09
91
NY
07/1 3/09
103.5
NY
07/1 3/09
105.8
NY
07/1 3/09
126.5
NY
07/1 3/09
150.5
NY
07/1 3/09
134.8
NY
07/1 3/09
67.2
NY
07/1 3/09
64.3
NY
07/1 3/09
65.9
NY
07/1 3/09
142.1
NY
07/1 3/09
147.7
NY
07/1 3/09
136.6
NY
07/14/09
75.5
NY
07/14/09
73.7
NY
07/14/09
85.6
NY
07/14/09
127.4
NY
07/14/09
123.2
NY
07/14/09
106.6
NY
07/14/09
97.4
NY
07/14/09
84.1
NY
07/14/09
82.7
NY
07/14/09
81.3
NY
07/14/09
81.8
NY
07/14/09
79.4
NY
07/14/09
78.2
F-517

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/14/09
72
NY
07/14/09
203.4
NY
07/14/09
87.9
NY
07/14/09
85.4
NY
07/14/09
90.9
NY
07/14/09
84.2
NY
07/14/09
79.5
NY
07/14/09
80.7
NY
07/14/09
72.9
NY
07/14/09
71.7
NY
07/15/09
136.7
NY
07/15/09
125.4
NY
07/15/09
113.2
NY
07/15/09
88.1
NY
07/15/09
61.2
NY
07/15/09
124.3
NY
07/15/09
138.5
NY
07/15/09
102.8
NY
07/15/09
104.3
NY
07/15/09
102.8
NY
07/15/09
121.1
NY
07/15/09
107.2
NY
07/15/09
96
NY
07/15/09
92.2
NY
07/15/09
93.8
NY
07/15/09
89.7
NY
07/15/09
78
NY
07/15/09
109.6
NY
07/15/09
99.3
NY
07/15/09
94.6
NY
07/15/09
90.2
NY
07/15/09
96.7
NY
07/15/09
99.1
NY
07/15/09
93.2
NY
07/15/09
86.1
NY
07/15/09
85.5
NY
07/15/09
79.3
NY
07/16/09
63.1
NY
07/16/09
61.2
NY
07/16/09
63
NY
07/16/09
65.9
NY
07/16/09
70
NY
07/16/09
9.6
NY
07/16/09
95.6
NY
07/16/09
77.4
F-518

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/16/09
72.9
NY
07/16/09
68.4
NY
07/16/09
74.4
NY
07/16/09
71.1
NY
07/16/09
72
NY
07/16/09
150
NY
07/16/09
163.7
NY
07/16/09
157.2
NY
07/16/09
149.9
NY
07/16/09
135.1
NY
07/16/09
142.5
NY
07/16/09
167.2
NY
07/16/09
162.1
NY
07/16/09
162.7
NY
07/16/09
153.5
NY
07/16/09
144.3
NY
07/1 7/09
120.7
NY
07/1 7/09
176.1
NY
07/1 7/09
121.4
NY
07/1 7/09
164.1
NY
07/1 7/09
183.1
NY
07/1 7/09
17.4
NY
07/1 7/09
121.9
NY
07/1 7/09
70.7
NY
07/1 7/09
65.2
NY
07/1 7/09
63.1
NY
07/1 7/09
60.2
NY
07/1 7/09
59.4
NY
07/1 7/09
61.7
NY
07/1 7/09
59.1
NY
07/1 7/09
57
NY
07/1 7/09
53.9
NY
07/1 7/09
56.2
NY
07/1 7/09
52.1
NY
07/1 7/09
40.9
NY
07/1 7/09
9.8
NY
07/1 7/09
66.3
NY
07/1 7/09
60.5
NY
07/1 7/09
61.9
NY
07/1 7/09
61.3
NY
07/1 7/09
62.7
NY
07/18/09
94
NY
07/18/09
84.2
NY
07/18/09
121.2
NY
07/18/09
128.1
F-519

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/18/09
84.9
NY
07/18/09
76.2
NY
07/18/09
111.1
NY
07/18/09
77
NY
07/18/09
120.9
NY
07/18/09
82.9
NY
07/18/09
81.8
NY
07/18/09
36
NY
07/18/09
672.5
NY
07/18/09
247.2
NY
07/18/09
188.8
NY
07/18/09
165.9
NY
07/18/09
168.4
NY
07/18/09
162.7
NY
07/18/09
171.6
NY
07/18/09
203.7
NY
07/18/09
241.9
NY
07/18/09
234.9
NY
07/18/09
138.6
NY
07/18/09
157
NY
07/18/09
188.3
NY
07/18/09
110.5
NY
07/18/09
68.9
NY
07/18/09
130.4
NY
07/18/09
131.9
NY
07/18/09
130.2
NY
07/18/09
120.9
NY
07/18/09
115.8
NY
07/18/09
124.2
NY
07/18/09
124.7
NY
07/18/09
155.8
NY
07/18/09
146.4
NY
07/18/09
149.1
NY
07/18/09
163.6
NY
07/18/09
197.4
NY
07/18/09
147.6
NY
07/18/09
72.2
NY
07/18/09
17.3
NY
07/19/09
48.6
NY
07/19/09
48.2
NY
07/19/09
59.8
NY
07/19/09
94.1
NY
07/19/09
18
NY
07/19/09
125.5
NY
07/19/09
145.4
F-520

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/19/09
139.3
NY
07/19/09
80.9
NY
07/19/09
72.3
NY
07/19/09
66.3
NY
07/19/09
54.5
NY
07/19/09
47.6
NY
07/19/09
48.9
NY
07/19/09
55.5
NY
07/19/09
32.1
NY
07/19/09
32
NY
07/19/09
58.5
NY
07/19/09
53.4
NY
07/19/09
50.8
NY
07/19/09
64.7
NY
07/19/09
58
NY
07/19/09
92.4
NY
07/19/09
101.9
NY
07/19/09
119.8
NY
07/19/09
116.5
NY
07/20/09
60
NY
07/20/09
47.3
NY
07/20/09
49.4
NY
07/20/09
49.6
NY
07/20/09
387.9
NY
07/20/09
95.8
NY
07/20/09
69.9
NY
07/20/09
404.1
NY
07/20/09
189.2
NY
07/20/09
82.2
NY
07/20/09
70.5
NY
07/20/09
68
NY
07/20/09
61.9
NY
07/20/09
54
NY
07/20/09
49.4
NY
07/20/09
48
NY
07/20/09
48.6
NY
07/20/09
45.6
NY
07/20/09
45.3
NY
07/20/09
43.2
NY
07/20/09
44.1
NY
07/20/09
47.1
NY
07/20/09
49.7
NY
07/21/09
84.4
NY
07/21/09
126.9
NY
07/21/09
62.8
F-521

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/21/09
57.6
NY
07/21/09
34.1
NY
07/21/09
100.1
NY
07/21/09
99.5
NY
07/21/09
93.3
NY
07/21/09
98.8
NY
07/21/09
122.2
NY
07/21/09
101.7
NY
07/21/09
98.2
NY
07/21/09
77.7
NY
07/21/09
88.3
NY
07/21/09
79.9
NY
07/21/09
99.5
NY
07/21/09
87.7
NY
07/21/09
89.9
NY
07/21/09
108.9
NY
07/21/09
120.9
NY
07/21/09
129.1
NY
07/21/09
117.3
NY
07/21/09
86.8
NY
07/21/09
54.4
NY
07/21/09
52.4
NY
07/21/09
55.9
NY
07/21/09
52.6
NY
07/21/09
21.6
NY
07/21/09
49.5
NY
07/21/09
49.6
NY
07/21/09
47.5
NY
07/21/09
46.9
NY
07/21/09
49
NY
07/21/09
48.2
NY
07/21/09
73.8
NY
07/21/09
51
NY
07/21/09
51
NY
07/21/09
50.5
NY
07/21/09
53.7
NY
07/21/09
55.3
NY
07/21/09
58.3
NY
07/22/09
104
NY
07/22/09
109.1
NY
07/22/09
103.1
NY
07/22/09
89.5
NY
07/22/09
89.2
NY
07/22/09
94.8
NY
07/22/09
134.2
F-522

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/22/09
127.5
NY
07/22/09
139.4
NY
07/22/09
142.2
NY
07/22/09
147.7
NY
07/22/09
142.2
NY
07/22/09
92.6
NY
07/22/09
51.8
NY
07/22/09
94.3
NY
07/22/09
71.6
NY
07/22/09
69.5
NY
07/22/09
71.9
NY
07/22/09
70
NY
07/22/09
40.5
NY
07/22/09
69
NY
07/22/09
101.6
NY
07/22/09
104.7
NY
07/23/09
456
NY
07/23/09
284
NY
07/23/09
210.4
NY
07/23/09
112.2
NY
07/23/09
122.5
NY
07/23/09
101.7
NY
07/23/09
152.3
NY
07/23/09
161.2
NY
07/23/09
197.5
NY
07/23/09
139.4
NY
07/23/09
142.8
NY
07/23/09
166
NY
07/23/09
136.2
NY
07/23/09
144.6
NY
07/23/09
189.3
NY
07/23/09
133
NY
07/23/09
134.8
NY
07/23/09
127.8
NY
07/23/09
134.1
NY
07/23/09
114.5
NY
07/23/09
140.8
NY
07/23/09
116.1
NY
07/23/09
119.9
NY
07/23/09
192.6
NY
07/23/09
133
NY
07/23/09
186.7
NY
07/23/09
282.1
NY
07/23/09
120.1
NY
07/23/09
133.2
F-523

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/23/09
152.7
NY
07/23/09
146.6
NY
07/23/09
143.1
NY
07/23/09
152.3
NY
07/23/09
167.4
NY
07/23/09
196.4
NY
07/23/09
157.9
NY
07/23/09
153.1
NY
07/23/09
162.3
NY
07/23/09
113.4
NY
07/23/09
116
NY
07/23/09
222.4
NY
07/23/09
329
NY
07/23/09
138.5
NY
07/23/09
135.7
NY
07/23/09
142.9
NY
07/23/09
131.9
NY
07/23/09
181.1
NY
07/23/09
131.5
NY
07/23/09
134.6
NY
07/23/09
236.1
NY
07/23/09
153.9
NY
07/23/09
135.6
NY
07/23/09
64.7
NY
07/23/09
218.7
NY
07/23/09
151.4
NY
07/23/09
96.5
NY
07/23/09
90.6
NY
07/23/09
83.7
NY
07/23/09
90.6
NY
07/24/09
129.3
NY
07/24/09
177.9
NY
07/24/09
220.3
NY
07/24/09
139
NY
07/24/09
583.1
NY
07/24/09
136.5
NY
07/24/09
161.5
NY
07/24/09
118.8
NY
07/24/09
219.4
NY
07/24/09
165.7
NY
07/24/09
95.8
NY
07/24/09
52.4
NY
07/24/09
65.7
NY
07/24/09
81.2
NY
07/24/09
604
F-524

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/24/09
252.6
NY
07/24/09
264.3
NY
07/24/09
929.5
NY
07/24/09
270.5
NY
07/24/09
274.3
NY
07/24/09
3.3
NY
07/24/09
4.3
NY
07/24/09
169.6
NY
07/24/09
115.1
NY
07/24/09
232.5
NY
07/24/09
91.8
NY
07/24/09
99.5
NY
07/24/09
87.5
NY
07/24/09
171.1
NY
07/24/09
92.1
NY
07/24/09
177.1
NY
07/24/09
219.8
NY
07/24/09
134.3
NY
07/24/09
101.3
NY
07/24/09
94.2
NY
07/24/09
93.9
NY
07/24/09
91.4
NY
07/24/09
93.9
NY
07/24/09
107.4
NY
07/24/09
116.2
NY
07/24/09
149.7
NY
07/24/09
130.4
NY
07/24/09
100.5
NY
07/24/09
84.6
NY
07/24/09
200.9
NY
07/24/09
180.2
NY
07/24/09
182.6
NY
07/24/09
193.9
NY
07/24/09
174.1
NY
07/24/09
153.4
NY
07/24/09
128.9
NY
07/24/09
278
NY
07/25/09
41.8
NY
07/25/09
43.6
NY
07/25/09
62.7
NY
07/25/09
49.5
NY
07/25/09
43.3
NY
07/25/09
45.1
NY
07/25/09
49.4
NY
07/25/09
77.3
F-525

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/25/09
63.1
NY
07/25/09
57.6
NY
07/25/09
50.9
NY
07/25/09
52.2
NY
07/25/09
172.8
NY
07/25/09
80.2
NY
07/25/09
94.9
NY
07/25/09
67.2
NY
07/25/09
59
NY
07/25/09
77.8
NY
07/25/09
22.5
NY
07/25/09
143.8
NY
07/25/09
127.2
NY
07/25/09
139
NY
07/25/09
142.6
NY
07/25/09
120
NY
07/25/09
121.9
NY
07/25/09
137.9
NY
07/25/09
118.8
NY
07/25/09
148.4
NY
07/25/09
147.8
NY
07/25/09
119.7
NY
07/26/09
131.2
NY
07/26/09
120.7
NY
07/26/09
137.9
NY
07/26/09
145.3
NY
07/26/09
141.7
NY
07/26/09
125
NY
07/26/09
244.3
NY
07/26/09
400.8
NY
07/26/09
201.8
NY
07/26/09
223.6
NY
07/26/09
98.8
NY
07/26/09
112
NY
07/26/09
128.4
NY
07/26/09
143.9
NY
07/26/09
156.9
NY
07/26/09
184.6
NY
07/26/09
136.5
NY
07/26/09
151.4
NY
07/26/09
160.8
NY
07/26/09
22.8
NY
07/26/09
38.3
NY
07/26/09
91.4
NY
07/26/09
24
F-526

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/26/09
234.9
NY
07/26/09
60.9
NY
07/26/09
40.3
NY
07/26/09
43.4
NY
07/26/09
45.6
NY
07/26/09
43.9
NY
07/27/09
50.7
NY
07/27/09
54
NY
07/27/09
63.1
NY
07/27/09
63
NY
07/27/09
63.8
NY
07/27/09
74.2
NY
07/27/09
116.1
NY
07/27/09
92.2
NY
07/27/09
94.6
NY
07/27/09
98.4
NY
07/27/09
83.5
NY
07/27/09
73.2
NY
07/27/09
76.2
NY
07/27/09
84.7
NY
07/27/09
99.3
NY
07/27/09
42.4
NY
07/27/09
60.2
NY
07/27/09
20.1
NY
07/27/09
137.5
NY
07/27/09
113.8
NY
07/27/09
120
NY
07/27/09
109.7
NY
07/27/09
124.2
NY
07/27/09
117.7
NY
07/27/09
106.4
NY
07/27/09
91.7
NY
07/27/09
146.1
NY
07/27/09
119.5
NY
07/28/09
49.5
NY
07/28/09
44.9
NY
07/28/09
39.2
NY
07/28/09
39.2
NY
07/28/09
68.4
NY
07/28/09
42
NY
07/28/09
44
NY
07/28/09
45.4
NY
07/28/09
47.2
NY
07/28/09
39.8
NY
07/28/09
38.3
F-527

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/28/09
81.7
NY
07/28/09
68.4
NY
07/28/09
61.7
NY
07/28/09
55
NY
07/28/09
53.3
NY
07/28/09
56.4
NY
07/28/09
47.8
NY
07/28/09
48.8
NY
07/29/09
129.7
NY
07/29/09
135.5
NY
07/29/09
136.9
NY
07/29/09
127.4
NY
07/29/09
120.2
NY
07/29/09
110.9
NY
07/29/09
102.5
NY
07/29/09
105.4
NY
07/29/09
114.4
NY
07/29/09
120.1
NY
07/29/09
85
NY
07/29/09
71.6
NY
07/29/09
38.8
NY
07/29/09
58.3
NY
07/29/09
59
NY
07/29/09
59
NY
07/29/09
56.6
NY
07/29/09
48.5
NY
07/29/09
44.9
NY
07/29/09
46.2
NY
07/29/09
45.3
NY
07/29/09
48
NY
07/29/09
50.2
NY
07/29/09
51.3
NY
07/29/09
53.7
NY
07/29/09
54.7
NY
07/29/09
53.3
NY
07/29/09
51.3
NY
07/29/09
48.8
NY
07/29/09
49.1
NY
07/29/09
50.4
NY
07/29/09
37.1
NY
07/29/09
32.6
NY
07/29/09
111.2
NY
07/30/09
68.5
NY
07/30/09
72.7
NY
07/30/09
73.5
F-528

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
07/30/09
78.4
NY
07/30/09
100.3
NY
07/30/09
93.1
NY
07/30/09
76.6
NY
07/30/09
69.9
NY
07/30/09
77.4
NY
07/30/09
81.9
NY
07/30/09
73.2
NY
07/30/09
65.3
NY
07/30/09
71
NY
07/30/09
33.7
NY
07/31/09
60.2
NY
07/31/09
100
NY
07/31/09
56.8
NY
07/31/09
57.2
NY
07/31/09
65.8
NY
07/31/09
52.5
NY
07/31/09
54.5
NY
07/31/09
57.9
NY
07/31/09
59.1
NY
07/31/09
59.7
NY
07/31/09
55.5
NY
07/31/09
59.4
NY
07/31/09
78.1
NY
07/31/09
77.2
NY
07/31/09
71.4
NY
07/31/09
68.8
NY
07/31/09
63.5
NY
07/31/09
65.7
NY
07/31/09
65.7
NY
07/31/09
59.5
NY
07/31/09
60.9
NY
07/31/09
69.3
NY
07/31/09
44.4
NY
08/01/09
285.4
NY
08/01/09
32.5
NY
08/01/09
186.9
NY
08/01/09
49.6
NY
08/01/09
50.3
NY
08/01/09
66.3
NY
08/01/09
58.1
NY
08/01/09
58.2
NY
08/01/09
58
NY
08/01/09
54.3
NY
08/01/09
53.5
F-529

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/01/09
56.8
NY
08/01/09
60.8
NY
08/01/09
105
NY
08/01/09
67.7
NY
08/01/09
65.7
NY
08/01/09
68
NY
08/01/09
68.9
NY
08/01/09
63.1
NY
08/01/09
62.5
NY
08/01/09
61.1
NY
08/01/09
63.7
NY
08/02/09
104.3
NY
08/02/09
144.7
NY
08/02/09
206
NY
08/02/09
167.5
NY
08/02/09
150.1
NY
08/02/09
143.2
NY
08/02/09
131.4
NY
08/02/09
121.3
NY
08/02/09
117.5
NY
08/02/09
93.5
NY
08/02/09
153.5
NY
08/02/09
180.7
NY
08/02/09
216.5
NY
08/02/09
216.8
NY
08/02/09
174.3
NY
08/02/09
137.6
NY
08/02/09
108.3
NY
08/02/09
165
NY
08/02/09
111.1
NY
08/02/09
118
NY
08/02/09
111.9
NY
08/02/09
108.6
NY
08/02/09
91.3
NY
08/02/09
78.4
NY
08/02/09
84.1
NY
08/02/09
105.3
NY
08/02/09
182.2
NY
08/03/09
89.6
NY
08/03/09
92.7
NY
08/03/09
112.9
NY
08/03/09
93
NY
08/03/09
103.4
NY
08/03/09
93.8
NY
08/03/09
90.1
F-530

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/03/09
94.3
NY
08/03/09
103.1
NY
08/03/09
110.3
NY
08/03/09
81.6
NY
08/03/09
82.1
NY
08/03/09
86.6
NY
08/03/09
93.7
NY
08/03/09
110.3
NY
08/03/09
71.1
NY
08/03/09
142.5
NY
08/03/09
121.9
NY
08/03/09
97.6
NY
08/03/09
87.8
NY
08/03/09
85.9
NY
08/03/09
92.1
NY
08/03/09
97.1
NY
08/03/09
92.5
NY
08/04/09
236.3
NY
08/04/09
152.5
NY
08/04/09
68.6
NY
08/04/09
134.8
NY
08/04/09
132.7
NY
08/04/09
120.2
NY
08/04/09
79.1
NY
08/04/09
92.9
NY
08/04/09
87.2
NY
08/04/09
88.3
NY
08/04/09
103.3
NY
08/04/09
92.3
NY
08/04/09
94.7
NY
08/04/09
99
NY
08/04/09
95
NY
08/04/09
95.5
NY
08/04/09
103
NY
08/04/09
122.7
NY
08/04/09
123.2
NY
08/04/09
109.3
NY
08/04/09
106.1
NY
08/04/09
102.2
NY
08/05/09
132.2
NY
08/05/09
127.1
NY
08/05/09
130
NY
08/05/09
133.2
NY
08/05/09
134.8
NY
08/05/09
117.1
F-531

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/05/09
91.5
NY
08/05/09
95.3
NY
08/05/09
112.2
NY
08/05/09
141.5
NY
08/05/09
150.6
NY
08/05/09
151.1
NY
08/05/09
157.5
NY
08/05/09
150
NY
08/05/09
159
NY
08/05/09
157.3
NY
08/05/09
158.9
NY
08/05/09
155
NY
08/05/09
162.8
NY
08/05/09
161.3
NY
08/05/09
155.1
NY
08/05/09
169.5
NY
08/05/09
152.7
NY
08/05/09
152.8
NY
08/05/09
159.5
NY
08/05/09
140
NY
08/05/09
144.7
NY
08/05/09
148.2
NY
08/05/09
186
NY
08/05/09
166
NY
08/05/09
88.3
NY
08/05/09
89
NY
08/05/09
89.4
NY
08/05/09
108.1
NY
08/06/09
108.3
NY
08/06/09
102.4
NY
08/06/09
97
NY
08/06/09
99.4
NY
08/06/09
145
NY
08/06/09
98.8
NY
08/06/09
79.8
NY
08/06/09
82.7
NY
08/06/09
132.8
NY
08/06/09
131.3
NY
08/06/09
127.8
NY
08/06/09
138.9
NY
08/06/09
131.7
NY
08/06/09
118.4
NY
08/06/09
115.9
NY
08/06/09
118.9
NY
08/06/09
119.6
F-532

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/06/09
115
NY
08/06/09
122.7
NY
08/06/09
128.6
NY
08/06/09
121.9
NY
08/06/09
150.1
NY
08/07/09
55.1
NY
08/07/09
59.9
NY
08/07/09
78.6
NY
08/07/09
17.8
NY
08/07/09
109.8
NY
08/07/09
116.3
NY
08/07/09
114.4
NY
08/07/09
117.3
NY
08/07/09
153.8
NY
08/07/09
211.5
NY
08/07/09
276
NY
08/07/09
252.9
NY
08/07/09
173.3
NY
08/07/09
81.4
NY
08/07/09
81.3
NY
08/07/09
85.2
NY
08/07/09
88.6
NY
08/07/09
99.3
NY
08/07/09
113.5
NY
08/07/09
111.4
NY
08/07/09
123.1
NY
08/07/09
136.3
NY
08/07/09
143.5
NY
08/08/09
56.9
NY
08/08/09
60.2
NY
08/08/09
59.6
NY
08/08/09
63.1
NY
08/08/09
66.1
NY
08/08/09
84.9
NY
08/08/09
24.2
NY
08/08/09
108.3
NY
08/08/09
88.3
NY
08/08/09
50.7
NY
08/08/09
56.2
NY
08/08/09
38
NY
08/08/09
44.8
NY
08/08/09
42.4
NY
08/08/09
42
NY
08/08/09
43
NY
08/08/09
46.1
F-533

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/08/09
51.3
NY
08/08/09
55.7
NY
08/08/09
75.5
NY
08/08/09
67.2
NY
08/08/09
62
NY
08/08/09
55.4
NY
08/09/09
21.9
NY
08/09/09
69.1
NY
08/09/09
210.5
NY
08/09/09
124.3
NY
08/09/09
126.8
NY
08/09/09
127.9
NY
08/09/09
131.9
NY
08/09/09
110.8
NY
08/09/09
102.8
NY
08/09/09
105.6
NY
08/09/09
109.5
NY
08/09/09
110.7
NY
08/09/09
110.5
NY
08/09/09
107.4
NY
08/09/09
151.8
NY
08/09/09
97.3
NY
08/09/09
99.8
NY
08/09/09
101.8
NY
08/09/09
100.9
NY
08/09/09
98
NY
08/09/09
90.4
NY
08/09/09
75.8
NY
08/09/09
90.8
NY
08/09/09
17.5
NY
08/10/09
140.8
NY
08/10/09
105.6
NY
08/10/09
57.5
NY
08/10/09
91.3
NY
08/10/09
195.1
NY
08/10/09
178.3
NY
08/10/09
171.6
NY
08/10/09
181.4
NY
08/10/09
177.7
NY
08/10/09
181.5
NY
08/10/09
195.8
NY
08/10/09
131.4
NY
08/10/09
106.6
NY
08/10/09
109.7
NY
08/10/09
104.4
F-534

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/10/09
155.9
NY
08/10/09
114
NY
08/10/09
110.1
NY
08/10/09
116.2
NY
08/10/09
118.6
NY
08/10/09
117
NY
08/10/09
116.9
NY
08/10/09
106.6
NY
08/10/09
115.8
NY
08/10/09
110.9
NY
08/10/09
101.7
NY
08/10/09
134.7
NY
08/10/09
78.5
NY
08/10/09
25.2
NY
08/10/09
38.8
NY
08/10/09
39.5
NY
08/10/09
60.2
NY
08/11/09
90.4
NY
08/11/09
89
NY
08/11/09
75.6
NY
08/11/09
74.2
NY
08/11/09
69.4
NY
08/11/09
83.3
NY
08/11/09
11.5
NY
08/11/09
119.9
NY
08/11/09
108.5
NY
08/11/09
86.7
NY
08/11/09
119.3
NY
08/11/09
177.7
NY
08/11/09
174.1
NY
08/11/09
181.3
NY
08/11/09
175.4
NY
08/11/09
176.7
NY
08/11/09
174.5
NY
08/11/09
169.3
NY
08/11/09
169.1
NY
08/11/09
163.2
NY
08/11/09
151.6
NY
08/11/09
153
NY
08/11/09
166.6
NY
08/11/09
167.4
NY
08/11/09
165.2
NY
08/11/09
165.2
NY
08/11/09
165.1
NY
08/11/09
165.6
F-535

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/11/09
160.6
NY
08/11/09
159.1
NY
08/11/09
155.7
NY
08/11/09
156
NY
08/11/09
154.7
NY
08/11/09
154.9
NY
08/11/09
150.9
NY
08/11/09
148.9
NY
08/11/09
140.7
NY
08/11/09
137.8
NY
08/11/09
139.6
NY
08/1 2/09
63.6
NY
08/1 2/09
65.9
NY
08/1 2/09
67.8
NY
08/1 2/09
67.2
NY
08/1 2/09
66.5
NY
08/1 2/09
68
NY
08/1 2/09
68.5
NY
08/1 2/09
120.8
NY
08/1 2/09
88.1
NY
08/1 2/09
79.5
NY
08/1 2/09
72.8
NY
08/1 2/09
51.6
NY
08/1 2/09
28.1
NY
08/1 2/09
67.8
NY
08/1 2/09
74.8
NY
08/1 2/09
66.5
NY
08/1 2/09
65.4
NY
08/1 2/09
52.4
NY
08/1 2/09
47.7
NY
08/1 2/09
48.8
NY
08/1 2/09
48.7
NY
08/1 2/09
50.8
NY
08/1 2/09
54.4
NY
08/1 2/09
59.7
NY
08/1 2/09
81.1
NY
08/1 2/09
114.2
NY
08/1 2/09
95
NY
08/1 2/09
90.3
NY
08/1 2/09
88.9
NY
08/1 2/09
89.2
NY
08/1 2/09
94.2
NY
08/1 3/09
63.2
NY
08/1 3/09
64.2
NY
08/1 3/09
64.1
F-536

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/1 3/09
63.1
NY
08/1 3/09
64
NY
08/1 3/09
66.2
NY
08/1 3/09
80.2
NY
08/1 3/09
101.7
NY
08/1 3/09
67
NY
08/1 3/09
61
NY
08/1 3/09
53.6
NY
08/1 3/09
51.3
NY
08/1 3/09
62.6
NY
08/1 3/09
44.3
NY
08/1 3/09
42.5
NY
08/1 3/09
42
NY
08/1 3/09
40.8
NY
08/1 3/09
42
NY
08/1 3/09
43.2
NY
08/1 3/09
45.7
NY
08/1 3/09
59.4
NY
08/1 3/09
62.9
NY
08/1 3/09
60.6
NY
08/1 3/09
61.6
NY
08/14/09
55.7
NY
08/14/09
56
NY
08/14/09
56.5
NY
08/14/09
57.7
NY
08/14/09
69.2
NY
08/14/09
67.6
NY
08/14/09
58.3
NY
08/14/09
54.6
NY
08/14/09
59.1
NY
08/14/09
63.9
NY
08/14/09
68.1
NY
08/14/09
52.9
NY
08/14/09
153.9
NY
08/14/09
71.1
NY
08/14/09
68.8
NY
08/14/09
45.5
NY
08/14/09
45.7
NY
08/14/09
47
NY
08/14/09
49.2
NY
08/14/09
51.1
NY
08/14/09
99.2
NY
08/14/09
120.1
NY
08/14/09
59.8
NY
08/14/09
61.1
F-537

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/15/09
69.3
NY
08/15/09
70.4
NY
08/15/09
62
NY
08/15/09
63.5
NY
08/15/09
72.8
NY
08/15/09
101.6
NY
08/15/09
99.3
NY
08/15/09
109.6
NY
08/15/09
52.7
NY
08/15/09
48.6
NY
08/15/09
49.4
NY
08/15/09
52.3
NY
08/15/09
57
NY
08/15/09
50.5
NY
08/15/09
45.1
NY
08/15/09
47.1
NY
08/15/09
60.5
NY
08/15/09
56
NY
08/15/09
52.7
NY
08/15/09
53.4
NY
08/15/09
54.4
NY
08/15/09
55.1
NY
08/16/09
80.2
NY
08/16/09
87.2
NY
08/16/09
111.6
NY
08/16/09
141.2
NY
08/16/09
122.5
NY
08/16/09
182.9
NY
08/16/09
59.6
NY
08/16/09
52.5
NY
08/16/09
48
NY
08/16/09
49
NY
08/16/09
51.8
NY
08/16/09
66.1
NY
08/16/09
59.8
NY
08/16/09
61.1
NY
08/16/09
64.8
NY
08/16/09
58.6
NY
08/16/09
60.3
NY
08/16/09
61.6
NY
08/16/09
60.9
NY
08/16/09
57.1
NY
08/16/09
49.7
NY
08/16/09
49.5
NY
08/1 7/09
52.5
F-538

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/1 7/09
51.3
NY
08/1 7/09
52.5
NY
08/1 7/09
53.3
NY
08/1 7/09
60.2
NY
08/1 7/09
43.1
NY
08/1 7/09
43.6
NY
08/1 7/09
44.4
NY
08/1 7/09
45
NY
08/1 7/09
52.8
NY
08/1 7/09
90.1
NY
08/1 7/09
252.9
NY
08/1 7/09
48.1
NY
08/1 7/09
47.4
NY
08/1 7/09
47.9
NY
08/1 7/09
47.4
NY
08/1 7/09
42.7
NY
08/1 7/09
39
NY
08/1 7/09
36.7
NY
08/1 7/09
37.1
NY
08/1 7/09
40.3
NY
08/1 7/09
45.8
NY
08/1 7/09
32.9
NY
08/18/09
46.5
NY
08/18/09
50.6
NY
08/18/09
66.3
NY
08/18/09
40.8
NY
08/18/09
46.1
NY
08/18/09
166.3
NY
08/18/09
82.5
NY
08/18/09
80.7
NY
08/18/09
93.4
NY
08/18/09
85.1
NY
08/18/09
102.2
NY
08/18/09
66.8
NY
08/18/09
86
NY
08/18/09
89.4
NY
08/18/09
112
NY
08/18/09
62.1
NY
08/18/09
63.1
NY
08/18/09
82.5
NY
08/18/09
104.3
NY
08/18/09
120.5
NY
08/18/09
133.8
NY
08/18/09
201.3
NY
08/18/09
152.5
F-539

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/18/09
172
NY
08/18/09
220.1
NY
08/18/09
235.1
NY
08/18/09
91.7
NY
08/18/09
76.5
NY
08/18/09
66.2
NY
08/18/09
51.4
NY
08/18/09
46
NY
08/18/09
47.4
NY
08/18/09
43.7
NY
08/18/09
45.7
NY
08/18/09
49.4
NY
08/18/09
76
NY
08/18/09
51.2
NY
08/18/09
51
NY
08/18/09
44.1
NY
08/18/09
41.9
NY
08/18/09
45.9
NY
08/18/09
49.2
NY
08/18/09
54
NY
08/18/09
43.3
NY
08/18/09
41.7
NY
08/18/09
43.6
NY
08/18/09
60.2
NY
08/19/09
74.4
NY
08/19/09
69.5
NY
08/19/09
61.8
NY
08/19/09
54.9
NY
08/19/09
65.4
NY
08/19/09
87.5
NY
08/19/09
114.9
NY
08/19/09
110.5
NY
08/19/09
116.4
NY
08/19/09
132.4
NY
08/19/09
110.1
NY
08/19/09
111.6
NY
08/19/09
128.4
NY
08/19/09
104.2
NY
08/19/09
95.5
NY
08/19/09
102.8
NY
08/19/09
109.4
NY
08/19/09
100
NY
08/19/09
113.8
NY
08/19/09
87.8
NY
08/19/09
89.6
F-540

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/19/09
97
NY
08/19/09
154.9
NY
08/19/09
23
NY
08/19/09
92.9
NY
08/19/09
96.3
NY
08/19/09
101
NY
08/19/09
105.2
NY
08/19/09
84.2
NY
08/19/09
91.8
NY
08/19/09
124.5
NY
08/19/09
86.4
NY
08/19/09
95.6
NY
08/19/09
109.1
NY
08/20/09
144.1
NY
08/20/09
132.8
NY
08/20/09
131.7
NY
08/20/09
48.9
NY
08/20/09
40.4
NY
08/20/09
36
NY
08/20/09
33.4
NY
08/20/09
81.9
NY
08/20/09
152.8
NY
08/20/09
102.7
NY
08/20/09
91.9
NY
08/20/09
76.5
NY
08/20/09
74.9
NY
08/20/09
85.9
NY
08/20/09
74.4
NY
08/20/09
101.5
NY
08/20/09
63.9
NY
08/20/09
51.4
NY
08/20/09
57.3
NY
08/20/09
52
NY
08/20/09
55.3
NY
08/20/09
66.1
NY
08/20/09
35.9
NY
08/20/09
38.5
NY
08/20/09
60.4
NY
08/20/09
76.2
NY
08/20/09
76.6
NY
08/20/09
70.1
NY
08/20/09
64.8
NY
08/20/09
55
NY
08/20/09
46.1
NY
08/20/09
44.4
F-541

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/20/09
52.3
NY
08/20/09
46.5
NY
08/20/09
47.8
NY
08/20/09
62.3
NY
08/21/09
37.8
NY
08/21/09
62.5
NY
08/21/09
63.4
NY
08/21/09
69.2
NY
08/21/09
75.7
NY
08/21/09
102
NY
08/21/09
89.7
NY
08/21/09
77.9
NY
08/21/09
76.6
NY
08/21/09
74.6
NY
08/21/09
78.1
NY
08/21/09
99.3
NY
08/21/09
92.4
NY
08/21/09
79.5
NY
08/21/09
73.9
NY
08/21/09
79.8
NY
08/21/09
80.9
NY
08/21/09
88.7
NY
08/21/09
95.8
NY
08/21/09
98.9
NY
08/21/09
147.6
NY
08/21/09
191.7
NY
08/21/09
321.1
NY
08/21/09
186.1
NY
08/21/09
84
NY
08/21/09
119.8
NY
08/21/09
113.7
NY
08/21/09
115.5
NY
08/21/09
95.3
NY
08/21/09
100.9
NY
08/21/09
165.4
NY
08/21/09
103.8
NY
08/21/09
113
NY
08/21/09
115
NY
08/21/09
509.2
NY
08/21/09
74
NY
08/21/09
60.4
NY
08/22/09
74.1
NY
08/22/09
35
NY
08/22/09
80
NY
08/22/09
63.9
F-542

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/22/09
54.5
NY
08/22/09
57.3
NY
08/22/09
80
NY
08/22/09
87.2
NY
08/22/09
82.1
NY
08/22/09
76.3
NY
08/22/09
63.3
NY
08/22/09
52.6
NY
08/22/09
58.2
NY
08/22/09
43.8
NY
08/22/09
45
NY
08/22/09
53.6
NY
08/22/09
89.2
NY
08/22/09
31
NY
08/22/09
73.3
NY
08/22/09
72.5
NY
08/22/09
68
NY
08/22/09
69.3
NY
08/22/09
76.8
NY
08/22/09
48.7
NY
08/22/09
48.2
NY
08/22/09
51.1
NY
08/22/09
51.9
NY
08/22/09
45.6
NY
08/22/09
26.4
NY
08/22/09
29.9
NY
08/23/09
78.6
NY
08/23/09
61
NY
08/23/09
38.9
NY
08/23/09
41
NY
08/23/09
43.2
NY
08/23/09
63.5
NY
08/23/09
53
NY
08/23/09
47.3
NY
08/23/09
44
NY
08/23/09
43
NY
08/23/09
43.3
NY
08/23/09
44.9
NY
08/23/09
43.3
NY
08/23/09
45.2
NY
08/23/09
310.6
NY
08/23/09
27.2
NY
08/23/09
59.4
NY
08/23/09
63.2
NY
08/23/09
61
F-543

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/23/09
57.6
NY
08/23/09
42.6
NY
08/23/09
33
NY
08/23/09
35
NY
08/23/09
39.1
NY
08/23/09
46.6
NY
08/24/09
72.9
NY
08/24/09
63.8
NY
08/24/09
43.7
NY
08/24/09
41.1
NY
08/24/09
42.9
NY
08/24/09
60
NY
08/24/09
33.8
NY
08/24/09
30.6
NY
08/24/09
26.6
NY
08/24/09
23.9
NY
08/24/09
22.3
NY
08/24/09
23.1
NY
08/24/09
27
NY
08/24/09
45.5
NY
08/24/09
18.6
NY
08/24/09
46.6
NY
08/24/09
45.1
NY
08/24/09
35.8
NY
08/24/09
26.3
NY
08/24/09
27.8
NY
08/24/09
33.6
NY
08/24/09
35.2
NY
08/24/09
39.5
NY
08/24/09
51
NY
08/24/09
67.8
NY
08/25/09
602.8
NY
08/25/09
84.2
NY
08/25/09
6.5
NY
08/25/09
111.2
NY
08/25/09
88.6
NY
08/25/09
80.3
NY
08/25/09
47.6
NY
08/25/09
48.5
NY
08/25/09
62.9
NY
08/25/09
20
NY
08/25/09
44.8
NY
08/25/09
40
NY
08/25/09
34.9
NY
08/25/09
35.1
F-544

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/25/09
37.2
NY
08/25/09
40.7
NY
08/25/09
41.2
NY
08/25/09
65.3
NY
08/25/09
66.2
NY
08/25/09
62.6
NY
08/25/09
59.1
NY
08/25/09
41.2
NY
08/25/09
35.4
NY
08/25/09
37.8
NY
08/25/09
42.4
NY
08/25/09
46.8
NY
08/25/09
55
NY
08/25/09
67.7
NY
08/25/09
84.7
NY
08/26/09
76.2
NY
08/26/09
26.3
NY
08/26/09
92.4
NY
08/26/09
94.8
NY
08/26/09
94.6
NY
08/26/09
95.9
NY
08/26/09
96.9
NY
08/26/09
99.3
NY
08/26/09
99.5
NY
08/26/09
101.2
NY
08/26/09
109.2
NY
08/26/09
124.6
NY
08/26/09
159.7
NY
08/26/09
150.5
NY
08/26/09
185.5
NY
08/26/09
147.1
NY
08/26/09
141.2
NY
08/26/09
118.7
NY
08/26/09
54.1
NY
08/26/09
66.8
NY
08/26/09
87.4
NY
08/26/09
52.9
NY
08/26/09
76.2
NY
08/26/09
73.7
NY
08/26/09
69
NY
08/26/09
74.6
NY
08/26/09
66.2
NY
08/26/09
35.6
NY
08/26/09
36
NY
08/26/09
41.5
F-545

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/26/09
57.5
NY
08/26/09
120.8
NY
08/26/09
111
NY
08/26/09
113
NY
08/26/09
114.9
NY
08/26/09
109.2
NY
08/26/09
115.8
NY
08/26/09
126.1
NY
08/26/09
129.9
NY
08/26/09
133.4
NY
08/26/09
104
NY
08/26/09
299.3
NY
08/27/09
65.8
NY
08/27/09
20.1
NY
08/27/09
42.8
NY
08/27/09
37.9
NY
08/27/09
37.2
NY
08/27/09
43.3
NY
08/27/09
58.5
NY
08/27/09
94.7
NY
08/27/09
59.1
NY
08/27/09
51.9
NY
08/27/09
38
NY
08/27/09
33.4
NY
08/27/09
34
NY
08/27/09
38.9
NY
08/27/09
47.5
NY
08/27/09
65.5
NY
08/27/09
114.2
NY
08/27/09
103.4
NY
08/27/09
100.2
NY
08/27/09
102.1
NY
08/27/09
97.4
NY
08/27/09
96.2
NY
08/27/09
106.7
NY
08/27/09
100.8
NY
08/27/09
99.2
NY
08/27/09
80.8
NY
08/27/09
80.5
NY
08/27/09
70
NY
08/27/09
64.6
NY
08/28/09
20.6
NY
08/28/09
30
NY
08/28/09
26.9
NY
08/28/09
27
F-546

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/28/09
28.4
NY
08/28/09
31.8
NY
08/28/09
31.9
NY
08/28/09
55.9
NY
08/28/09
30.8
NY
08/28/09
28
NY
08/28/09
22.2
NY
08/28/09
22.9
NY
08/28/09
24.8
NY
08/28/09
27
NY
08/28/09
39.9
NY
08/28/09
13.9
NY
08/28/09
24.9
NY
08/28/09
24.8
NY
08/28/09
25
NY
08/28/09
27.7
NY
08/28/09
29.2
NY
08/28/09
31.2
NY
08/28/09
37.2
NY
08/29/09
70.4
NY
08/29/09
56.7
NY
08/29/09
133.2
NY
08/29/09
155
NY
08/29/09
183.6
NY
08/29/09
77.4
NY
08/29/09
101.5
NY
08/29/09
68.9
NY
08/29/09
55.5
NY
08/29/09
80.1
NY
08/29/09
126.8
NY
08/29/09
155
NY
08/29/09
134.6
NY
08/29/09
146.1
NY
08/29/09
152.6
NY
08/29/09
107.5
NY
08/29/09
110.6
NY
08/29/09
142.1
NY
08/29/09
133.8
NY
08/29/09
123.7
NY
08/29/09
76.7
NY
08/29/09
129.6
NY
08/29/09
129.5
NY
08/29/09
185.5
NY
08/29/09
142.1
NY
08/29/09
123.3
F-547

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/29/09
141.9
NY
08/29/09
205.9
NY
08/29/09
155.2
NY
08/29/09
108
NY
08/29/09
105.1
NY
08/29/09
447.9
NY
08/29/09
413.7
NY
08/29/09
191.6
NY
08/29/09
55.6
NY
08/29/09
144.9
NY
08/29/09
208.2
NY
08/29/09
163.2
NY
08/29/09
169.4
NY
08/29/09
227.9
NY
08/29/09
63.2
NY
08/29/09
91.9
NY
08/29/09
89.5
NY
08/29/09
188.2
NY
08/29/09
56.9
NY
08/29/09
91.4
NY
08/29/09
276.1
NY
08/29/09
114.8
NY
08/29/09
110.5
NY
08/29/09
72.6
NY
08/29/09
147
NY
08/29/09
90.4
NY
08/29/09
275
NY
08/29/09
120.4
NY
08/29/09
126
NY
08/29/09
350
NY
08/29/09
763.9
NY
08/29/09
454
NY
08/29/09
435.1
NY
08/29/09
49.4
NY
08/29/09
49
NY
08/29/09
48.4
NY
08/29/09
47.8
NY
08/29/09
44.5
NY
08/29/09
36.9
NY
08/29/09
30.3
NY
08/29/09
33
NY
08/29/09
46.2
NY
08/30/09
94.2
NY
08/30/09
95.4
NY
08/30/09
65.8
F-548

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/30/09
74.1
NY
08/30/09
73.8
NY
08/30/09
89.9
NY
08/30/09
103
NY
08/30/09
107.1
NY
08/30/09
109.5
NY
08/30/09
117.8
NY
08/30/09
93.9
NY
08/30/09
107.2
NY
08/30/09
103.8
NY
08/30/09
100.1
NY
08/30/09
107.8
NY
08/30/09
99.9
NY
08/30/09
103.1
NY
08/30/09
220.9
NY
08/30/09
105.4
NY
08/30/09
107.9
NY
08/30/09
134.3
NY
08/30/09
434.2
NY
08/30/09
95.6
NY
08/30/09
96.5
NY
08/30/09
100.3
NY
08/30/09
84.6
NY
08/30/09
69.6
NY
08/30/09
70.6
NY
08/30/09
70.1
NY
08/30/09
75.4
NY
08/30/09
79.9
NY
08/30/09
51.1
NY
08/30/09
44.3
NY
08/30/09
48
NY
08/30/09
57
NY
08/30/09
53.8
NY
08/30/09
142.6
NY
08/30/09
143.7
NY
08/30/09
137.1
NY
08/30/09
129.1
NY
08/30/09
116.5
NY
08/30/09
92.6
NY
08/30/09
165.8
NY
08/31/09
75.4
NY
08/31/09
46
NY
08/31/09
41
NY
08/31/09
44.4
NY
08/31/09
65.8
F-549

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
08/31/09
82
NY
08/31/09
60
NY
08/31/09
59.6
NY
08/31/09
74.8
NY
08/31/09
60.4
NY
08/31/09
65.8
NY
08/31/09
76.3
NY
08/31/09
98.6
NY
08/31/09
152
NY
08/31/09
152
NY
08/31/09
152
NY
08/31/09
152
NY
08/31/09
152
NY
08/31/09
152
NY
08/31/09
93.5
NY
08/31/09
86.3
NY
08/31/09
102.7
NY
08/31/09
106.5
NY
08/31/09
79.6
NY
08/31/09
44
NY
08/31/09
133.6
NY
08/31/09
142.3
NY
08/31/09
124
NY
08/31/09
138.9
NY
08/31/09
137.3
NY
08/31/09
136.4
NY
08/31/09
115.2
NY
08/31/09
138.1
NY
08/31/09
70.7
NY
09/01/09
65.1
NY
09/01/09
71.1
NY
09/01/09
73.1
NY
09/01/09
67.1
NY
09/01/09
147.1
NY
09/01/09
60.3
NY
09/01/09
41.1
NY
09/01/09
39.8
NY
09/01/09
40.3
NY
09/01/09
41.6
NY
09/01/09
41.8
NY
09/01/09
38.6
NY
09/01/09
111.9
NY
09/01/09
43.9
NY
09/01/09
51.3
NY
09/01/09
39.6
F-550

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
09/01/09
36.4
NY
09/01/09
33.5
NY
09/01/09
38.9
NY
09/01/09
32.1
NY
09/01/09
39.1
NY
09/01/09
73.1
NY
09/02/09
72.4
NY
09/02/09
37
NY
09/02/09
145.2
NY
09/03/09
122.7
NY
09/04/09
66.1
NY
09/04/09
56.1
NY
09/04/09
46
NY
09/04/09
48.4
NY
09/04/09
55
NY
09/04/09
97.5
NY
09/04/09
74
NY
09/04/09
82.7
NY
09/04/09
103.3
NY
09/04/09
104.7
NY
09/04/09
94.1
NY
09/04/09
87.5
NY
09/04/09
61
NY
09/04/09
78.3
NY
09/04/09
82.2
NY
09/04/09
380.6
NY
09/04/09
65.8
NY
09/04/09
89.8
NY
09/04/09
46.7
NY
09/04/09
42.1
NY
09/04/09
43.1
NY
09/04/09
43.6
NY
09/04/09
41.3
NY
09/04/09
38.6
NY
09/04/09
37.4
NY
09/04/09
39.8
NY
09/04/09
78.7
NY
09/05/09
60.3
NY
09/05/09
55
NY
09/05/09
41.5
NY
09/05/09
41.2
NY
09/05/09
42.3
NY
09/05/09
44.8
NY
09/05/09
48
NY
09/05/09
43.2
F-551

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
09/05/09
41.8
NY
09/05/09
58.8
NY
09/05/09
54.1
NY
09/05/09
57.2
NY
09/05/09
51.6
NY
09/05/09
40.6
NY
09/05/09
37.6
NY
09/05/09
43.8
NY
09/05/09
84
NY
09/06/09
84.6
NY
09/06/09
76.6
NY
09/06/09
84.9
NY
09/06/09
91.1
NY
09/06/09
84.4
NY
09/06/09
57.6
NY
09/06/09
163.7
NY
09/06/09
242.8
NY
09/06/09
41.4
NY
09/06/09
41.5
NY
09/06/09
112
NY
09/06/09
54.2
NY
09/06/09
52.6
NY
09/06/09
40.7
NY
09/06/09
28.4
NY
09/06/09
20.3
NY
09/06/09
22.2
NY
09/06/09
26.6
NY
09/06/09
35.6
NY
09/06/09
73.9
NY
09/07/09
48.4
NY
09/07/09
64.1
NY
09/07/09
69.2
NY
09/07/09
75.4
NY
09/07/09
38.5
NY
09/07/09
43.4
NY
09/07/09
35
NY
09/07/09
38.2
NY
09/07/09
44.1
NY
09/07/09
57.4
NY
09/07/09
74.5
NY
09/07/09
67.7
NY
09/07/09
53.4
NY
09/07/09
39.5
NY
09/07/09
31.9
NY
09/07/09
28.3
F-552

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
09/07/09
30.1
NY
09/07/09
33
NY
09/07/09
37.7
NY
09/07/09
48.6
NY
09/07/09
80.6
NY
09/08/09
37.5
NY
09/08/09
42
NY
09/08/09
64.5
NY
09/08/09
31.8
NY
09/08/09
32.2
NY
09/08/09
33.1
NY
09/08/09
33.8
NY
09/08/09
36.6
NY
09/08/09
42
NY
09/08/09
55.2
NY
09/08/09
71.5
NY
09/08/09
54.3
NY
09/08/09
54.3
NY
09/08/09
51.1
NY
09/08/09
42.1
NY
09/08/09
35.4
NY
09/08/09
31.1
NY
09/08/09
31.2
NY
09/08/09
34.1
NY
09/08/09
42.7
NY
09/08/09
72
NY
09/09/09
178.8
NY
09/09/09
66.6
NY
09/09/09
59.1
NY
09/09/09
61.2
NY
09/09/09
66.7
NY
09/09/09
80.8
NY
09/09/09
61.7
NY
09/09/09
58.1
NY
09/09/09
57.6
NY
09/09/09
59.6
NY
09/09/09
60.7
NY
09/09/09
63.8
NY
09/09/09
85.9
NY
09/09/09
60.9
NY
09/09/09
58.2
NY
09/09/09
54.3
NY
09/09/09
47.7
NY
09/09/09
43
NY
09/09/09
40.5
F-553

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
09/09/09
38.3
NY
09/09/09
37.8
NY
09/10/09
25.8
NY
09/10/09
25.1
NY
09/10/09
28.1
NY
09/10/09
37.5
NY
09/10/09
89.5
NY
09/10/09
56.2
NY
09/10/09
44.3
NY
09/10/09
38.8
NY
09/10/09
33.8
NY
09/10/09
33.2
NY
09/10/09
28.4
NY
09/10/09
36.4
NY
09/10/09
13
NY
09/10/09
95.4
NY
09/10/09
98.4
NY
09/10/09
100.8
NY
09/10/09
99
NY
09/10/09
112.6
NY
09/10/09
95.9
NY
09/10/09
96.4
NY
09/10/09
95.4
NY
09/10/09
90.5
NY
09/10/09
81.8
NY
09/10/09
83.8
NY
09/10/09
88
NY
09/10/09
94.3
NY
09/11/09
23.4
NY
09/11/09
25.3
NY
09/11/09
32.3
NY
09/11/09
17
NY
09/11/09
16.9
NY
09/11/09
17.4
NY
09/11/09
20.1
NY
09/11/09
28.1
NY
09/11/09
25.5
NY
09/11/09
25.3
NY
09/11/09
27
NY
09/11/09
21.2
NY
09/11/09
21.7
NY
09/11/09
25.3
NY
09/11/09
41.5
NY
09/11/09
33.1
NY
09/11/09
31.8
F-554

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
09/11/09
29
NY
09/1 2/09
47.6
NY
09/1 2/09
33.4
NY
09/1 2/09
32.1
NY
09/1 2/09
32.5
NY
09/1 2/09
36.8
NY
09/1 2/09
30.6
NY
09/1 2/09
30.5
NY
09/1 2/09
34.1
NY
09/1 2/09
34.1
NY
09/1 2/09
29.5
NY
09/1 2/09
29.4
NY
09/1 2/09
40.2
NY
09/1 2/09
16.1
NY
09/1 2/09
29.5
NY
09/1 2/09
26.5
NY
09/1 2/09
25.3
NY
09/1 2/09
24.5
NY
09/1 2/09
24
NY
09/1 3/09
19.8
NY
09/1 3/09
21.6
NY
09/1 3/09
30.3
NY
09/1 3/09
45.4
NY
09/1 3/09
133.2
NY
09/1 3/09
25.9
NY
09/1 3/09
26.9
NY
09/1 3/09
30.5
NY
09/1 3/09
39.2
NY
09/1 3/09
27.8
NY
09/1 3/09
27.5
NY
09/1 3/09
29.9
NY
09/1 3/09
31.7
NY
09/1 3/09
28.5
NY
09/1 3/09
32.4
NY
09/1 3/09
45.6
NY
09/1 3/09
34.1
NY
09/1 3/09
26.1
NY
09/1 3/09
23
NY
09/1 3/09
22.1
NY
09/1 3/09
23.2
NY
09/1 3/09
29.5
NY
09/1 3/09
48.3
NY
09/1 3/09
86.7
NY
09/1 3/09
95.4
NY
09/14/09
26.9
F-555

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
09/14/09
29.4
NY
09/14/09
39.4
NY
09/14/09
75.1
NY
09/14/09
127.4
NY
09/14/09
126
NY
09/14/09
47.7
NY
09/14/09
47.3
NY
09/14/09
49.1
NY
09/14/09
75.6
NY
09/14/09
39.9
NY
09/14/09
26.3
NY
09/14/09
22.5
NY
09/14/09
23
NY
09/14/09
24.3
NY
09/14/09
26.9
NY
09/14/09
31.6
NY
09/14/09
66.3
NY
09/14/09
30
NY
09/14/09
28.4
NY
09/14/09
22.9
NY
09/14/09
20.8
NY
09/15/09
17.4
NY
09/15/09
16
NY
09/15/09
15.4
NY
09/15/09
18.6
NY
09/15/09
24.3
NY
09/15/09
121.1
NY
09/15/09
22.2
NY
09/15/09
20.1
NY
09/15/09
23.1
NY
09/15/09
40.8
NY
09/15/09
31.8
NY
09/15/09
28.3
NY
09/15/09
26.5
NY
09/15/09
29.5
NY
09/15/09
41.4
NY
09/15/09
256.9
NY
09/15/09
36.9
NY
09/15/09
31
NY
09/15/09
23.9
NY
09/15/09
24.9
NY
09/16/09
19.9
NY
09/16/09
18.8
NY
09/16/09
20.2
NY
09/16/09
28.8
F-556

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
NY
09/16/09
21.5
NY
09/16/09
22.5
NY
09/16/09
26.4
NY
09/16/09
29
NY
09/16/09
25.6
NY
09/16/09
58.6
NY
09/16/09
31.3
NY
09/16/09
25
NY
09/16/09
23.5
NY
09/16/09
24.7
Red. East
09/29/06
8.9
Red. East
09/29/06
8.7
Red. East
10/03/06
9.7
Red. East
10/03/06
6.3
Red. East
10/03/06
7.9
Red. East
10/05/06
107.8
Red. East
10/06/06
636.1
Red. East
10/06/06
719.8
Red. East
10/06/06
851.7
Red. East
10/06/06
955
Red. East
10/06/06
1000.9
Red. East
10/06/06
871.9
Red. East
10/06/06
121
Red. East
10/06/06
15.8
Red. East
10/06/06
3.7
Red. East
10/06/06
360.4
Red. East
10/06/06
1000.6
Red. East
10/06/06
987.3
Red. East
10/06/06
838.3
Red. East
10/09/06
872.6
Red. East
10/09/06
869
Red. East
10/09/06
613.1
Red. East
10/09/06
617.5
Red. East
10/09/06
685.9
Red. East
10/09/06
621.4
Red. East
10/09/06
615.5
Red. East
10/09/06
486.2
Red. East
10/1 2/06
263.5
Red. East
10/1 2/06
275.7
Red. East
10/1 2/06
291.4
Red. East
10/1 2/06
309.4
Red. East
10/1 2/06
329.3
Red. East
10/1 2/06
351.2
Red. East
10/1 2/06
373.1
Red. East
10/1 2/06
395.9
F-557

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/1 2/06
420
Red. East
10/1 2/06
444.7
Red. East
10/1 2/06
471.5
Red. East
10/1 2/06
498.6
Red. East
10/1 2/06
527.8
Red. East
10/1 2/06
558.9
Red. East
10/1 2/06
592.2
Red. East
10/1 2/06
628.9
Red. East
10/1 2/06
669.9
Red. East
10/1 2/06
716.3
Red. East
10/1 2/06
766
Red. East
10/1 2/06
818.2
Red. East
10/1 2/06
870.2
Red. East
10/1 2/06
918
Red. East
10/1 2/06
958.9
Red. East
10/1 2/06
974.4
Red. East
10/1 2/06
912.6
Red. East
10/1 2/06
853.1
Red. East
10/1 2/06
710.1
Red. East
10/1 2/06
650.1
Red. East
10/1 3/06
168.6
Red. East
10/1 3/06
161.7
Red. East
10/1 3/06
175.1
Red. East
10/1 3/06
184.2
Red. East
10/1 3/06
181.1
Red. East
10/1 3/06
189.4
Red. East
10/1 3/06
201
Red. East
10/1 3/06
205.8
Red. East
10/1 3/06
203.9
Red. East
10/16/06
417.6
Red. East
10/16/06
441.7
Red. East
10/16/06
521.7
Red. East
10/16/06
548.4
Red. East
10/16/06
647.2
Red. East
10/16/06
676.2
Red. East
10/16/06
772.3
Red. East
10/16/06
800.8
Red. East
10/16/06
813.3
Red. East
10/16/06
805.5
Red. East
10/16/06
683.1
Red. East
10/16/06
451.2
Red. East
10/16/06
338.3
Red. East
10/16/06
254.6
Red. East
10/16/06
211.5
Red. East
10/16/06
183.4
F-558

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/16/06
135.6
Red. East
10/16/06
170.5
Red. East
10/1 7/06
151
Red. East
10/1 7/06
165
Red. East
10/1 7/06
185.5
Red. East
10/1 7/06
191.7
Red. East
10/1 7/06
201.3
Red. East
10/1 7/06
236.4
Red. East
10/1 7/06
250.4
Red. East
10/1 7/06
270.6
Red. East
10/1 7/06
270.3
Red. East
10/1 7/06
239.1
Red. East
10/20/06
377.6
Red. East
10/20/06
438.9
Red. East
10/20/06
526.2
Red. East
10/20/06
637
Red. East
10/20/06
677.6
Red. East
10/20/06
754.4
Red. East
10/20/06
917.7
Red. East
10/20/06
953.4
Red. East
10/20/06
576.4
Red. East
10/20/06
198.5
Red. East
10/20/06
154
Red. East
10/20/06
227.8
Red. East
10/20/06
306.1
Red. East
10/20/06
407
Red. East
10/20/06
456.4
Red. East
10/20/06
463.6
Red. East
10/20/06
599.5
Red. East
10/20/06
653.6
Red. East
10/20/06
642.7
Red. East
10/20/06
442.9
Red. East
10/20/06
121.7
Red. East
10/20/06
163
Red. East
10/20/06
50
Red. East
10/23/06
357.9
Red. East
10/23/06
535.5
Red. East
10/23/06
641.1
Red. East
10/23/06
691
Red. East
10/23/06
651.7
Red. East
10/23/06
619.7
Red. East
10/23/06
390.6
Red. East
10/23/06
134.2
Red. East
10/23/06
155.4
Red. East
10/23/06
181.4
F-559

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/23/06
242.2
Red. East
10/23/06
311.1
Red. East
10/23/06
395.1
Red. East
10/23/06
510.2
Red. East
10/23/06
632.4
Red. East
10/23/06
708.9
Red. East
10/23/06
738.7
Red. East
10/23/06
621.7
Red. East
10/23/06
213.6
Red. East
10/23/06
174.5
Red. East
10/23/06
179.9
Red. East
10/23/06
218.6
Red. East
10/23/06
224.2
Red. East
10/25/06
187.1
Red. East
10/25/06
234.9
Red. East
10/25/06
290
Red. East
10/25/06
261.2
Red. East
10/25/06
340
Red. East
10/25/06
439.1
Red. East
10/25/06
558.9
Red. East
10/25/06
696.3
Red. East
10/25/06
861.9
Red. East
10/25/06
844.6
Red. East
10/25/06
431
Red. East
10/25/06
156.7
Red. East
10/25/06
165.8
Red. East
10/25/06
179.9
Red. East
10/25/06
203.9
Red. East
10/25/06
203.9
Red. East
10/25/06
250.1
Red. East
10/26/06
597.7
Red. East
10/26/06
413
Red. East
10/26/06
310.4
Red. East
10/26/06
290.4
Red. East
10/26/06
370.4
Red. East
10/26/06
457.4
Red. East
10/26/06
578.3
Red. East
10/26/06
710.4
Red. East
10/26/06
545.1
Red. East
10/26/06
698.3
Red. East
10/26/06
747.4
Red. East
10/26/06
288.8
Red. East
10/27/06
152.5
Red. East
10/27/06
210.6
Red. East
10/27/06
290.6
F-560

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/27/06
355.6
Red. East
10/27/06
432.5
Red. East
10/27/06
464.6
Red. East
10/27/06
536.5
Red. East
10/27/06
567.2
Red. East
10/27/06
622
Red. East
10/27/06
626.9
Red. East
10/27/06
399.7
Red. East
10/27/06
186.4
Red. East
10/27/06
202.7
Red. East
10/27/06
166.2
Red. East
10/27/06
182.6
Red. East
10/27/06
241.3
Red. East
10/27/06
310.7
Red. East
10/27/06
389.9
Red. East
10/27/06
482.8
Red. East
10/27/06
585.8
Red. East
10/27/06
684.5
Red. East
10/27/06
798.7
Red. East
10/27/06
893.3
Red. East
10/27/06
896.8
Red. East
10/27/06
643.4
Red. East
10/27/06
415.3
Red. East
11/02/06
337.6
Red. East
11/02/06
328.1
Red. East
11/02/06
458.3
Red. East
11/02/06
494.6
Red. East
11/02/06
564.4
Red. East
11/02/06
605.8
Red. East
11/02/06
681.7
Red. East
11/02/06
728.1
Red. East
11/02/06
750.2
Red. East
11/02/06
400.2
Red. East
11/02/06
147.1
Red. East
11/03/06
217.8
Red. East
11/03/06
303.4
Red. East
11/03/06
342.1
Red. East
11/03/06
385.4
Red. East
11/03/06
511.6
Red. East
11/03/06
682.6
Red. East
11/03/06
834.2
Red. East
11/03/06
480.2
Red. East
11/03/06
62
Red. East
11/03/06
280
Red. East
11/03/06
131.1
F-561

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/03/06
154.7
Red. East
11/03/06
167.9
Red. East
11/03/06
205.8
Red. East
11/03/06
265.4
Red. East
11/03/06
363.1
Red. East
11/03/06
491.1
Red. East
11/03/06
686.2
Red. East
11/03/06
767.8
Red. East
11/03/06
23.4
Red. East
11/03/06
169.6
Red. East
11/03/06
108.1
Red. East
11/04/06
170.4
Red. East
11/04/06
227.3
Red. East
11/04/06
321.1
Red. East
11/04/06
419.5
Red. East
11/04/06
591.3
Red. East
11/04/06
714.4
Red. East
11/04/06
818.9
Red. East
11/04/06
691.4
Red. East
11/04/06
229.9
Red. East
11/04/06
170.6
Red. East
11/04/06
246.7
Red. East
11/04/06
342.9
Red. East
11/04/06
504.2
Red. East
11/04/06
725.1
Red. East
11/04/06
376.7
Red. East
11/04/06
23.3
Red. East
11/04/06
268.6
Red. East
11/04/06
249.1
Red. East
11/04/06
216.9
Red. East
11/04/06
109.6
Red. East
11/04/06
116.2
Red. East
11/04/06
236.5
Red. East
11/04/06
390.6
Red. East
11/04/06
606.8
Red. East
11/04/06
861.8
Red. East
11/04/06
998.7
Red. East
11/04/06
311.2
Red. East
11/04/06
235.9
Red. East
11/04/06
246.4
Red. East
11/04/06
383.2
Red. East
11/04/06
468
Red. East
11/04/06
668.2
Red. East
11/04/06
749.9
Red. East
11/04/06
780.5
F-562

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/04/06
874.4
Red. East
11/04/06
379.7
Red. East
11/04/06
98.9
Red. East
11/04/06
392.3
Red. East
11/04/06
147.3
Red. East
11/04/06
97.6
Red. East
11/04/06
141.4
Red. East
11/04/06
146.4
Red. East
11/04/06
240
Red. East
11/04/06
308.5
Red. East
11/04/06
408.5
Red. East
11/04/06
405.2
Red. East
11/04/06
539.9
Red. East
11/04/06
743.5
Red. East
11/04/06
770.5
Red. East
11/04/06
16.3
Red. East
11/04/06
9.9
Red. East
11/04/06
468.3
Red. East
11/04/06
125.2
Red. East
11/04/06
100.6
Red. East
11/04/06
159.1
Red. East
11/05/06
193.7
Red. East
11/05/06
179.5
Red. East
11/05/06
378.6
Red. East
11/05/06
537.7
Red. East
11/05/06
386.9
Red. East
11/05/06
341.2
Red. East
11/05/06
401.4
Red. East
11/05/06
178.2
Red. East
11/05/06
163.7
Red. East
11/05/06
399.8
Red. East
11/05/06
633.3
Red. East
11/05/06
772.4
Red. East
11/05/06
377.8
Red. East
11/05/06
344.5
Red. East
11/05/06
158.1
Red. East
11/05/06
110.6
Red. East
11/05/06
470.6
Red. East
11/05/06
758.9
Red. East
11/05/06
944.1
Red. East
11/05/06
992.9
Red. East
11/05/06
272.1
Red. East
11/05/06
360.6
Red. East
11/05/06
488.7
Red. East
11/05/06
200.1
F-563

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/05/06
269.3
Red. East
11/05/06
686
Red. East
11/05/06
930.5
Red. East
11/05/06
304.9
Red. East
11/05/06
408.5
Red. East
11/05/06
508.6
Red. East
11/05/06
153.2
Red. East
11/05/06
99.1
Red. East
11/05/06
241.7
Red. East
11/05/06
265.1
Red. East
11/05/06
308.4
Red. East
11/05/06
487.6
Red. East
11/05/06
732.6
Red. East
11/05/06
951.9
Red. East
11/05/06
812.8
Red. East
11/05/06
169.2
Red. East
11/05/06
25.9
Red. East
11/05/06
228.7
Red. East
11/05/06
225.8
Red. East
11/05/06
288.9
Red. East
11/05/06
310
Red. East
11/05/06
617.8
Red. East
11/05/06
459.6
Red. East
11/05/06
211.8
Red. East
11/05/06
156.3
Red. East
11/05/06
145.6
Red. East
11/05/06
205.6
Red. East
11/05/06
386.4
Red. East
11/05/06
631
Red. East
11/05/06
934.9
Red. East
11/05/06
873.6
Red. East
11/05/06
253.8
Red. East
11/05/06
175.6
Red. East
11/05/06
189.9
Red. East
11/05/06
234.5
Red. East
11/05/06
319.3
Red. East
11/05/06
430.5
Red. East
11/05/06
447.1
Red. East
11/05/06
456.1
Red. East
11/05/06
339.3
Red. East
11/05/06
97.7
Red. East
11/05/06
145.5
Red. East
11/05/06
271.8
Red. East
11/05/06
514.8
Red. East
11/05/06
800.6
F-564

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/05/06
822.7
Red. East
11/05/06
392.5
Red. East
11/05/06
306.5
Red. East
11/05/06
306
Red. East
11/05/06
236.1
Red. East
11/05/06
102.6
Red. East
11/05/06
194.8
Red. East
11/05/06
354.2
Red. East
11/05/06
454.6
Red. East
11/05/06
520.5
Red. East
11/05/06
742
Red. East
11/05/06
920.6
Red. East
11/05/06
278.1
Red. East
11/05/06
97.2
Red. East
11/05/06
167.5
Red. East
11/05/06
177
Red. East
11/06/06
766.7
Red. East
11/06/06
932.6
Red. East
11/06/06
764.9
Red. East
11/06/06
179.1
Red. East
11/06/06
344.8
Red. East
11/06/06
732.8
Red. East
11/06/06
756.5
Red. East
11/06/06
44.1
Red. East
11/06/06
71.6
Red. East
11/06/06
523.1
Red. East
11/06/06
856.8
Red. East
11/06/06
177.9
Red. East
11/06/06
48.2
Red. East
11/06/06
190.6
Red. East
11/06/06
106.6
Red. East
11/06/06
139.9
Red. East
11/06/06
524.2
Red. East
11/06/06
879.8
Red. East
11/06/06
799.2
Red. East
11/06/06
519.4
Red. East
11/06/06
219.9
Red. East
11/06/06
661.6
Red. East
11/06/06
809.3
Red. East
11/06/06
417.2
Red. East
11/06/06
51.5
Red. East
11/06/06
557.2
Red. East
11/06/06
933.2
Red. East
11/06/06
310.8
Red. East
11/06/06
183.6
F-565

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/06/06
102.5
Red. East
11/06/06
90.8
Red. East
11/06/06
414.1
Red. East
11/06/06
798.1
Red. East
11/06/06
859.2
Red. East
11/06/06
189.9
Red. East
11/06/06
305.1
Red. East
11/06/06
581.5
Red. East
11/06/06
926.4
Red. East
11/06/06
811.1
Red. East
11/06/06
39.3
Red. East
11/06/06
213.3
Red. East
11/06/06
663
Red. East
11/06/06
852.9
Red. East
11/06/06
389.4
Red. East
11/06/06
228
Red. East
11/06/06
55.4
Red. East
11/06/06
157.8
Red. East
11/06/06
602.7
Red. East
11/06/06
894.5
Red. East
11/06/06
379.9
Red. East
11/06/06
239.9
Red. East
11/06/06
300.8
Red. East
11/06/06
163.7
Red. East
11/06/06
146.8
Red. East
11/06/06
422
Red. East
11/06/06
725.8
Red. East
11/06/06
484.5
Red. East
11/06/06
335.8
Red. East
11/06/06
337.6
Red. East
11/06/06
364.7
Red. East
11/06/06
350.6
Red. East
11/06/06
488.7
Red. East
11/06/06
269.4
Red. East
11/06/06
95.1
Red. East
11/06/06
162.3
Red. East
11/06/06
473
Red. East
11/06/06
745.4
Red. East
11/06/06
914
Red. East
11/06/06
407.4
Red. East
11/06/06
438.4
Red. East
11/06/06
116.5
Red. East
11/06/06
123.7
Red. East
11/06/06
148.6
Red. East
11/06/06
505.5
F-566

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/06/06
579.3
Red. East
11/06/06
723.7
Red. East
11/06/06
363.8
Red. East
11/06/06
334.7
Red. East
11/07/06
44.9
Red. East
11/07/06
56.5
Red. East
11/07/06
135.2
Red. East
11/07/06
208.9
Red. East
11/07/06
378.7
Red. East
11/07/06
565.1
Red. East
11/07/06
282
Red. East
11/07/06
124.5
Red. East
11/07/06
387.5
Red. East
11/07/06
357.6
Red. East
11/07/06
75.7
Red. East
11/07/06
87.1
Red. East
11/07/06
457.4
Red. East
11/07/06
678.4
Red. East
11/07/06
442.8
Red. East
11/07/06
190.1
Red. East
11/07/06
197.1
Red. East
11/07/06
233.5
Red. East
11/07/06
419.5
Red. East
11/07/06
218.3
Red. East
11/07/06
350.7
Red. East
11/07/06
477.4
Red. East
11/07/06
136.1
Red. East
11/07/06
96
Red. East
11/07/06
460
Red. East
11/07/06
742.5
Red. East
11/07/06
607.7
Red. East
11/07/06
336.7
Red. East
11/07/06
84.9
Red. East
11/07/06
138.7
Red. East
11/07/06
557.6
Red. East
11/07/06
549.3
Red. East
11/07/06
368.4
Red. East
11/07/06
115.8
Red. East
11/07/06
56.5
Red. East
11/07/06
28.3
Red. East
11/07/06
31.5
Red. East
11/07/06
49.4
Red. East
11/07/06
139.1
Red. East
11/07/06
663.9
Red. East
11/07/06
936
F-567

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/07/06
410.7
Red. East
11/07/06
264
Red. East
11/07/06
83.4
Red. East
11/07/06
161.6
Red. East
11/07/06
542.4
Red. East
11/07/06
774.3
Red. East
11/07/06
917.8
Red. East
11/07/06
371.5
Red. East
11/07/06
313.2
Red. East
11/07/06
548.3
Red. East
11/07/06
415.7
Red. East
11/07/06
42.9
Red. East
11/07/06
235.5
Red. East
11/07/06
671.3
Red. East
11/07/06
879.2
Red. East
11/07/06
411.8
Red. East
11/07/06
239.1
Red. East
11/07/06
277.2
Red. East
11/07/06
214.7
Red. East
11/07/06
548.3
Red. East
11/07/06
455.7
Red. East
11/07/06
423.4
Red. East
11/07/06
367.7
Red. East
11/07/06
255.9
Red. East
11/07/06
360.2
Red. East
11/07/06
423.1
Red. East
11/07/06
99.6
Red. East
11/07/06
356.2
Red. East
11/07/06
454.1
Red. East
11/07/06
182.3
Red. East
11/07/06
549.1
Red. East
11/07/06
620
Red. East
11/07/06
689
Red. East
11/07/06
686.8
Red. East
11/07/06
700.7
Red. East
11/07/06
397.2
Red. East
11/07/06
33
Red. East
11/07/06
289
Red. East
11/07/06
288.1
Red. East
11/07/06
90.2
Red. East
11/07/06
234.8
Red. East
11/08/06
136.4
Red. East
11/08/06
142
Red. East
11/08/06
319.7
Red. East
11/08/06
305.5
F-568

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/09/06
161.2
Red. East
11/09/06
365.3
Red. East
11/09/06
657.6
Red. East
11/09/06
476
Red. East
11/10/06
502.7
Red. East
11/10/06
361.6
Red. East
11/10/06
260.2
Red. East
11/10/06
312.9
Red. East
11/10/06
256.2
Red. East
11/10/06
320
Red. East
11/10/06
271.9
Red. East
11/10/06
275.7
Red. East
11/10/06
405.8
Red. East
11/10/06
310.4
Red. East
11/10/06
224.3
Red. East
11/10/06
287.6
Red. East
11/10/06
430.9
Red. East
11/10/06
387.9
Red. East
11/10/06
207.2
Red. East
11/10/06
180.4
Red. East
11/10/06
255.2
Red. East
11/10/06
384.9
Red. East
11/10/06
420.3
Red. East
11/10/06
327.5
Red. East
11/10/06
376.1
Red. East
11/10/06
181.8
Red. East
11/10/06
161.9
Red. East
11/10/06
221.4
Red. East
11/10/06
369.5
Red. East
11/10/06
572.3
Red. East
11/10/06
341
Red. East
11/10/06
238.2
Red. East
11/10/06
241.7
Red. East
11/10/06
261
Red. East
11/10/06
353.8
Red. East
11/10/06
360.2
Red. East
11/10/06
308.7
Red. East
11/10/06
411
Red. East
11/10/06
288.1
Red. East
11/10/06
163.4
Red. East
11/10/06
195.8
Red. East
11/10/06
328
Red. East
11/10/06
685.3
Red. East
11/10/06
80.1
Red. East
11/10/06
260.7
F-569

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/10/06
205.2
Red. East
11/10/06
220.6
Red. East
11/10/06
272.2
Red. East
11/10/06
282.2
Red. East
11/10/06
316.1
Red. East
11/10/06
450.9
Red. East
11/10/06
260
Red. East
11/10/06
327.2
Red. East
11/10/06
454
Red. East
11/10/06
447.1
Red. East
11/10/06
119.5
Red. East
11/10/06
119.4
Red. East
11/10/06
308.9
Red. East
11/10/06
569.1
Red. East
11/10/06
592.3
Red. East
11/10/06
477.3
Red. East
11/11/06
274.1
Red. East
11/11/06
243.4
Red. East
11/11/06
108.9
Red. East
11/11/06
124
Red. East
11/11/06
237.7
Red. East
11/11/06
423.6
Red. East
11/11/06
302.1
Red. East
11/12/06
281.9
Red. East
11/12/06
186.4
Red. East
11/12/06
250.2
Red. East
11/12/06
327.6
Red. East
11/12/06
446.2
Red. East
11/12/06
141.6
Red. East
11/12/06
198.9
Red. East
11/12/06
341.5
Red. East
11/12/06
406.4
Red. East
11/12/06
249.3
Red. East
11/12/06
188.3
Red. East
11/12/06
196.5
Red. East
11/12/06
210.9
Red. East
11/12/06
347.6
Red. East
11/12/06
535
Red. East
11/12/06
270.4
Red. East
11/12/06
207.6
Red. East
11/12/06
146.8
Red. East
11/12/06
271.4
Red. East
11/12/06
402.6
Red. East
11/13/06
247.7
Red. East
11/13/06
281.4
F-570

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/13/06
460.5
Red. East
11/13/06
383
Red. East
11/13/06
248.5
Red. East
11/13/06
192.4
Red. East
11/13/06
197.5
Red. East
11/13/06
241.1
Red. East
11/13/06
436.2
Red. East
11/13/06
476.9
Red. East
11/13/06
178.5
Red. East
11/13/06
165.4
Red. East
11/13/06
204.8
Red. East
11/13/06
308
Red. East
11/13/06
448.1
Red. East
11/13/06
254.5
Red. East
11/13/06
402.5
Red. East
11/13/06
309.6
Red. East
11/13/06
130.4
Red. East
11/13/06
133.9
Red. East
11/13/06
278.7
Red. East
11/13/06
454.6
Red. East
11/13/06
328.7
Red. East
11/13/06
368.8
Red. East
11/13/06
163.8
Red. East
11/13/06
125.7
Red. East
11/13/06
130.1
Red. East
11/13/06
208.6
Red. East
11/13/06
460.2
Red. East
11/13/06
616
Red. East
11/13/06
299.8
Red. East
11/13/06
193.1
Red. East
11/14/06
209
Red. East
11/14/06
260.4
Red. East
11/14/06
76
Red. East
11/15/06
671.6
Red. East
11/15/06
240.7
Red. East
11/15/06
364.1
Red. East
11/15/06
392.4
Red. East
11/15/06
190.1
Red. East
11/16/06
253
Red. East
11/16/06
369.5
Red. East
11/16/06
182.4
Red. East
11/16/06
117.1
Red. East
11/16/06
256.9
Red. East
11/16/06
256.7
Red. East
11/16/06
177.2
F-571

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/16/06
223.6
Red. East
11/16/06
481.1
Red. East
11/16/06
630.2
Red. East
11/16/06
239
Red. East
11/16/06
192.6
Red. East
11/16/06
150.6
Red. East
11/16/06
235.2
Red. East
11/16/06
513.8
Red. East
11/16/06
580.6
Red. East
11/16/06
285.9
Red. East
11/16/06
310.3
Red. East
11/16/06
292.7
Red. East
11/16/06
173.1
Red. East
11/16/06
243.5
Red. East
11/16/06
437.2
Red. East
11/16/06
471
Red. East
11/16/06
224.7
Red. East
11/16/06
242.3
Red. East
11/16/06
172.2
Red. East
11/16/06
256.2
Red. East
11/16/06
519.8
Red. East
11/16/06
659.8
Red. East
11/16/06
489.6
Red. East
11/16/06
120.4
Red. East
11/16/06
202.5
Red. East
11/16/06
272.8
Red. East
11/16/06
413.4
Red. East
11/16/06
368.6
Red. East
11/16/06
144.7
Red. East
11/16/06
151.6
Red. East
11/17/06
375.5
Red. East
11/17/06
194.8
Red. East
11/17/06
299.3
Red. East
11/17/06
376.8
Red. East
11/17/06
210.7
Red. East
11/17/06
204.4
Red. East
11/17/06
217.4
Red. East
11/17/06
402.6
Red. East
11/17/06
658.5
Red. East
11/17/06
405.1
Red. East
11/17/06
179
Red. East
11/17/06
169.3
Red. East
11/17/06
204.8
Red. East
11/17/06
276.1
Red. East
11/17/06
361.5
F-572

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/17/06
46.7
Red. East
11/20/06
332.2
Red. East
11/20/06
255.6
Red. East
11/20/06
345.1
Red. East
11/20/06
219.5
Red. East
11/20/06
149.5
Red. East
11/20/06
350.9
Red. East
11/20/06
615
Red. East
11/20/06
767.7
Red. East
11/20/06
359.7
Red. East
11/20/06
188.9
Red. East
11/20/06
230.1
Red. East
11/20/06
353
Red. East
11/20/06
368.2
Red. East
11/20/06
309.1
Red. East
11/20/06
365.2
Red. East
11/20/06
206.6
Red. East
11/20/06
154.1
Red. East
11/20/06
313.4
Red. East
11/20/06
731.6
Red. East
11/20/06
332
Red. East
11/20/06
104.9
Red. East
11/20/06
166.1
Red. East
11/20/06
475.7
Red. East
11/20/06
526
Red. East
11/20/06
723.4
Red. East
11/20/06
590
Red. East
11/20/06
6.6
Red. East
11/21/06
571
Red. East
11/21/06
499.7
Red. East
11/21/06
271.4
Red. East
11/21/06
132.2
Red. East
11/21/06
291.9
Red. East
11/21/06
571.1
Red. East
11/21/06
675.3
Red. East
11/21/06
204.5
Red. East
11/21/06
138.8
Red. East
11/21/06
189.6
Red. East
11/21/06
441.8
Red. East
11/21/06
566.6
Red. East
11/21/06
310.5
Red. East
11/21/06
387
Red. East
11/21/06
349.9
Red. East
11/21/06
114.2
Red. East
11/21/06
214.5
F-573

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/21/06
578
Red. East
11/21/06
788
Red. East
11/21/06
310.9
Red. East
11/21/06
126.4
Red. East
11/21/06
140.9
Red. East
11/21/06
349.1
Red. East
11/21/06
567.7
Red. East
11/21/06
661.8
Red. East
11/21/06
355.8
Red. East
11/21/06
397.9
Red. East
11/21/06
346.5
Red. East
11/21/06
114.6
Red. East
11/21/06
211.2
Red. East
11/21/06
562.8
Red. East
11/21/06
791.8
Red. East
11/21/06
478.2
Red. East
11/21/06
161.3
Red. East
11/21/06
193.4
Red. East
11/21/06
507.9
Red. East
11/21/06
634.4
Red. East
11/21/06
464.2
Red. East
11/22/06
352
Red. East
11/22/06
210.6
Red. East
11/22/06
236.2
Red. East
11/22/06
282.6
Red. East
11/22/06
259.7
Red. East
11/22/06
299.6
Red. East
11/22/06
245.8
Red. East
11/22/06
215.7
Red. East
11/22/06
254.5
Red. East
11/22/06
317.8
Red. East
11/22/06
244.1
Red. East
11/22/06
196.1
Red. East
11/22/06
233.8
Red. East
11/22/06
269.4
Red. East
11/22/06
309.7
Red. East
11/22/06
292.1
Red. East
11/22/06
245.7
Red. East
11/22/06
256.4
Red. East
11/22/06
332.4
Red. East
11/22/06
286.2
Red. East
11/22/06
267.9
Red. East
11/22/06
280.2
Red. East
11/22/06
312.4
Red. East
11/22/06
253.9
F-574

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/22/06
233.1
Red. East
11/22/06
249.2
Red. East
11/22/06
358.5
Red. East
11/22/06
366.2
Red. East
11/22/06
328
Red. East
11/22/06
233.1
Red. East
11/22/06
297.8
Red. East
11/22/06
425.2
Red. East
11/22/06
271.8
Red. East
11/22/06
207.8
Red. East
11/22/06
274
Red. East
11/22/06
471.4
Red. East
11/22/06
261.2
Red. East
11/22/06
199.9
Red. East
11/22/06
156.7
Red. East
11/22/06
346.9
Red. East
11/22/06
534.8
Red. East
11/22/06
412
Red. East
11/23/06
226.4
Red. East
11/23/06
276.7
Red. East
11/23/06
264
Red. East
11/23/06
255.3
Red. East
11/23/06
251.5
Red. East
11/23/06
268.6
Red. East
11/23/06
313.1
Red. East
11/23/06
230.4
Red. East
11/23/06
220.3
Red. East
11/23/06
222.5
Red. East
11/23/06
204.8
Red. East
11/23/06
333.1
Red. East
11/24/06
223.4
Red. East
11/24/06
228.9
Red. East
11/24/06
262.9
Red. East
11/24/06
227.3
Red. East
11/24/06
210.5
Red. East
11/24/06
228.5
Red. East
11/24/06
222.1
Red. East
11/24/06
23.4
Red. East
11/27/06
204.4
Red. East
11/27/06
205.7
Red. East
11/27/06
199.8
Red. East
11/27/06
219.3
Red. East
11/27/06
215.6
Red. East
11/27/06
186.6
Red. East
11/27/06
204.6
F-575

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/27/06
210.7
Red. East
11/27/06
181.9
Red. East
11/27/06
193.7
Red. East
11/27/06
207.4
Red. East
11/27/06
194.6
Red. East
11/27/06
170.1
Red. East
11/27/06
171.4
Red. East
11/27/06
233.7
Red. East
12/01/06
88.2
Red. East
12/01/06
235.3
Red. East
12/01/06
4.5
Red. East
12/01/06
4.9
Red. East
12/01/06
2.7
Red. East
12/01/06
2.7
Red. East
12/01/06
3
Red. East
1 2/04/06
128.9
Red. East
1 2/04/06
135.8
Red. East
1 2/04/06
139.2
Red. East
1 2/04/06
129.4
Red. East
1 2/04/06
121.5
Red. East
1 2/04/06
123.3
Red. East
1 2/04/06
135.1
Red. East
1 2/04/06
126.7
Red. East
1 2/04/06
131.1
Red. East
1 2/04/06
143.8
Red. East
1 2/04/06
94
Red. East
1 2/04/06
120.5
Red. East
1 2/04/06
171.6
Red. East
1 2/04/06
168.5
Red. East
1 2/04/06
179.6
Red. East
1 2/04/06
170
Red. East
1 2/04/06
5.3
Red. East
12/11/06
254.9
Red. East
12/11/06
311.8
Red. East
12/11/06
456.5
Red. East
12/11/06
630.2
Red. East
12/11/06
484.2
Red. East
12/11/06
283.7
Red. East
12/11/06
489.4
Red. East
12/11/06
727.4
Red. East
12/11/06
549.8
Red. East
12/11/06
343.1
Red. East
12/11/06
217.8
Red. East
12/11/06
258.6
Red. East
12/11/06
299.8
F-576

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
12/11/06
408.8
Red. East
12/11/06
714.3
Red. East
12/11/06
601.4
Red. East
12/11/06
384.6
Red. East
12/11/06
384
Red. East
12/11/06
347.8
Red. East
12/11/06
175.6
Red. East
12/11/06
241.2
Red. East
12/11/06
556.3
Red. East
12/11/06
756.6
Red. East
12/11/06
124.6
Red. East
12/11/06
309.1
Red. East
12/11/06
944.7
Red. East
12/11/06
612.6
Red. East
12/11/06
124.4
Red. East
12/11/06
185
Red. East
12/11/06
440.5
Red. East
12/11/06
755.7
Red. East
12/11/06
551.4
Red. East
12/11/06
131.1
Red. East
12/11/06
158.3
Red. East
12/11/06
176.1
Red. East
12/11/06
291.2
Red. East
12/11/06
443.4
Red. East
12/11/06
651.9
Red. East
12/11/06
934.5
Red. East
12/11/06
715
Red. East
12/11/06
258.8
Red. East
12/11/06
342.6
Red. East
12/11/06
524.5
Red. East
12/11/06
550.3
Red. East
12/11/06
248.8
Red. East
12/11/06
192.1
Red. East
12/11/06
137
Red. East
12/11/06
147.3
Red. East
12/11/06
293.1
Red. East
12/11/06
595.2
Red. East
12/11/06
708
Red. East
12/11/06
422.1
Red. East
12/11/06
4.6
Red. East
12/11/06
4
Red. East
1 2/1 2/06
268.6
Red. East
1 2/1 2/06
417.8
Red. East
1 2/1 2/06
602.2
Red. East
1 2/1 2/06
343.8
F-577

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/1 2/06
78.1
Red. East
1 2/1 2/06
199.6
Red. East
1 2/1 2/06
544
Red. East
1 2/1 2/06
659.8
Red. East
1 2/1 2/06
114.2
Red. East
1 2/1 2/06
237.9
Red. East
1 2/1 2/06
241.6
Red. East
1 2/1 2/06
264.5
Red. East
1 2/1 2/06
450.8
Red. East
1 2/1 2/06
388.3
Red. East
1 2/1 2/06
293
Red. East
1 2/1 2/06
395
Red. East
1 2/1 2/06
581.2
Red. East
1 2/1 2/06
506.7
Red. East
1 2/1 2/06
211.2
Red. East
1 2/1 2/06
285.3
Red. East
1 2/1 2/06
348.5
Red. East
1 2/1 2/06
25.3
Red. East
1 2/1 2/06
249.8
Red. East
1 2/1 2/06
147.9
Red. East
1 2/1 2/06
255.4
Red. East
1 2/1 2/06
589.7
Red. East
1 2/1 2/06
933.5
Red. East
1 2/1 2/06
685.7
Red. East
1 2/1 2/06
327.5
Red. East
1 2/1 2/06
495.2
Red. East
1 2/1 2/06
548.6
Red. East
1 2/1 2/06
358.5
Red. East
1 2/1 2/06
228.3
Red. East
1 2/1 2/06
373.1
Red. East
1 2/1 2/06
501.6
Red. East
1 2/1 2/06
162.3
Red. East
1 2/1 2/06
158.4
Red. East
1 2/1 2/06
176.1
Red. East
1 2/1 2/06
363.7
Red. East
1 2/1 2/06
604.9
Red. East
1 2/1 2/06
706.8
Red. East
1 2/1 2/06
432
Red. East
1 2/1 2/06
283.2
Red. East
1 2/1 2/06
317.6
Red. East
1 2/1 2/06
327.1
Red. East
1 2/1 2/06
240.3
Red. East
1 2/1 2/06
255.8
Red. East
1 2/1 3/06
291.7
Red. East
1 2/1 3/06
425
F-578

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/1 3/06
266
Red. East
1 2/1 3/06
336.3
Red. East
1 2/1 3/06
331.9
Red. East
1 2/1 3/06
355.9
Red. East
1 2/1 3/06
382.6
Red. East
1 2/1 3/06
204
Red. East
1 2/1 3/06
280.4
Red. East
1 2/1 3/06
440.3
Red. East
1 2/1 3/06
464.9
Red. East
1 2/1 3/06
250.2
Red. East
1 2/1 3/06
371.4
Red. East
1 2/1 3/06
196.3
Red. East
1 2/1 3/06
455
Red. East
1 2/1 3/06
324.3
Red. East
1 2/1 3/06
330.2
Red. East
1 2/1 3/06
374
Red. East
1 2/1 3/06
250.3
Red. East
1 2/1 3/06
267.9
Red. East
1 2/1 3/06
272
Red. East
1 2/1 3/06
271.2
Red. East
1 2/1 3/06
410.5
Red. East
1 2/1 3/06
466.1
Red. East
1 2/1 3/06
298.4
Red. East
1 2/1 3/06
249.3
Red. East
1 2/1 3/06
316
Red. East
1 2/1 3/06
421.7
Red. East
1 2/1 3/06
14.7
Red. East
1 2/1 3/06
178.5
Red. East
1 2/1 3/06
245.5
Red. East
1 2/1 3/06
259.4
Red. East
1 2/1 3/06
317.6
Red. East
1 2/1 3/06
389
Red. East
1 2/1 3/06
481
Red. East
1 2/1 3/06
319.6
Red. East
1 2/1 3/06
474.7
Red. East
1 2/1 3/06
613.6
Red. East
1 2/1 3/06
375.3
Red. East
1 2/1 3/06
214.4
Red. East
1 2/1 3/06
279.5
Red. East
1 2/1 3/06
267.2
Red. East
1 2/1 3/06
185.1
Red. East
1 2/1 3/06
252.3
Red. East
1 2/1 3/06
227.1
Red. East
1 2/1 3/06
242.9
Red. East
1 2/1 3/06
355.2
F-579

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/1 3/06
367.2
Red. East
1 2/1 3/06
203.3
Red. East
1 2/14/06
378.3
Red. East
1 2/14/06
545.9
Red. East
1 2/14/06
343.2
Red. East
1 2/14/06
466.5
Red. East
1 2/14/06
600.9
Red. East
1 2/14/06
423.3
Red. East
1 2/14/06
208.4
Red. East
1 2/14/06
278.8
Red. East
1 2/14/06
394.4
Red. East
1 2/14/06
646.3
Red. East
1 2/14/06
134
Red. East
1 2/14/06
250.5
Red. East
1 2/14/06
209.7
Red. East
1 2/14/06
250.7
Red. East
1 2/14/06
268.1
Red. East
1 2/14/06
458.8
Red. East
1 2/14/06
528.1
Red. East
1 2/14/06
766.3
Red. East
1 2/14/06
826.9
Red. East
1 2/14/06
171.7
Red. East
1 2/14/06
207.4
Red. East
1 2/14/06
405.4
Red. East
1 2/14/06
690.3
Red. East
1 2/14/06
803.1
Red. East
1 2/14/06
134.8
Red. East
1 2/14/06
161.6
Red. East
1 2/14/06
293.6
Red. East
1 2/14/06
336.5
Red. East
1 2/14/06
457.3
Red. East
1 2/14/06
353.1
Red. East
1 2/14/06
685
Red. East
1 2/14/06
211.2
Red. East
1 2/14/06
216.7
Red. East
1 2/14/06
243.7
Red. East
1 2/14/06
341
Red. East
1 2/14/06
323.9
Red. East
1 2/14/06
503.3
Red. East
1 2/14/06
599.7
Red. East
1 2/14/06
506.9
Red. East
1 2/14/06
216.6
Red. East
1 2/14/06
244.7
Red. East
1 2/14/06
265.2
Red. East
1 2/14/06
281.8
F-580

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/15/06
157.6
Red. East
1 2/15/06
169.5
Red. East
1 2/15/06
303.3
Red. East
1 2/15/06
353.1
Red. East
1 2/15/06
641.9
Red. East
1 2/15/06
790.3
Red. East
1 2/15/06
521.6
Red. East
1 2/15/06
309
Red. East
1 2/15/06
108.5
Red. East
1 2/15/06
119.5
Red. East
1 2/15/06
123.8
Red. East
1 2/15/06
153.6
Red. East
1 2/15/06
197
Red. East
1 2/15/06
269.3
Red. East
1 2/15/06
467.5
Red. East
1 2/15/06
45.5
Red. East
1 2/15/06
154.1
Red. East
1 2/15/06
204.9
Red. East
1 2/15/06
177.3
Red. East
1 2/15/06
193.1
Red. East
1 2/15/06
236.3
Red. East
1 2/15/06
296.8
Red. East
1 2/15/06
386.6
Red. East
1 2/15/06
242.9
Red. East
1 2/15/06
110.3
Red. East
1 2/15/06
154.4
Red. East
1 2/15/06
200.8
Red. East
1 2/15/06
308.7
Red. East
1 2/15/06
413.5
Red. East
1 2/15/06
359.2
Red. East
1 2/15/06
92
Red. East
1 2/15/06
84.1
Red. East
1 2/15/06
96
Red. East
1 2/15/06
144.2
Red. East
1 2/15/06
304
Red. East
1 2/15/06
745.8
Red. East
1 2/15/06
55.5
Red. East
1 2/15/06
113.8
Red. East
1 2/15/06
229.7
Red. East
1 2/15/06
329.1
Red. East
1 2/15/06
207.9
Red. East
1 2/15/06
221.5
Red. East
1 2/15/06
338.7
Red. East
1 2/15/06
483.5
Red. East
1 2/15/06
462.3
F-581

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/15/06
188.8
Red. East
1 2/15/06
267
Red. East
1 2/15/06
512.8
Red. East
1 2/15/06
448.8
Red. East
1 2/15/06
223
Red. East
1 2/15/06
227.7
Red. East
1 2/15/06
290.2
Red. East
1 2/15/06
393.5
Red. East
1 2/15/06
556.5
Red. East
1 2/15/06
585.9
Red. East
1 2/15/06
380.5
Red. East
1 2/15/06
353.7
Red. East
1 2/15/06
451.9
Red. East
1 2/15/06
405
Red. East
1 2/15/06
239.8
Red. East
1 2/15/06
224.1
Red. East
1 2/15/06
290.5
Red. East
1 2/15/06
346.8
Red. East
1 2/15/06
567.3
Red. East
1 2/15/06
300.5
Red. East
1 2/15/06
249.7
Red. East
1 2/15/06
230.8
Red. East
1 2/15/06
289.9
Red. East
1 2/15/06
336.2
Red. East
1 2/15/06
336.3
Red. East
1 2/15/06
12
Red. East
1 2/15/06
284.8
Red. East
1 2/15/06
374.5
Red. East
1 2/15/06
387.8
Red. East
1 2/15/06
370.1
Red. East
1 2/15/06
245.4
Red. East
1 2/15/06
354.2
Red. East
1 2/15/06
428.5
Red. East
1 2/15/06
551.1
Red. East
1 2/15/06
887.1
Red. East
1 2/15/06
75.6
Red. East
1 2/15/06
273.4
Red. East
1 2/15/06
392.6
Red. East
1 2/15/06
267.7
Red. East
1 2/15/06
285.1
Red. East
1 2/16/06
3.7
Red. East
1 2/16/06
3.7
Red. East
1 2/16/06
136
Red. East
1 2/16/06
159.8
Red. East
1 2/16/06
165.5
F-582

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/20/06
165.4
Red. East
1 2/20/06
196.4
Red. East
1 2/20/06
257.6
Red. East
1 2/20/06
241.3
Red. East
1 2/20/06
172.8
Red. East
1 2/20/06
273.4
Red. East
1 2/20/06
366.4
Red. East
1 2/20/06
249.3
Red. East
1 2/20/06
299.2
Red. East
1 2/20/06
371.4
Red. East
1 2/20/06
296.2
Red. East
1 2/20/06
79.4
Red. East
12/21/06
4.2
Red. East
12/21/06
157
Red. East
12/21/06
198.8
Red. East
12/21/06
337.2
Red. East
12/21/06
382.3
Red. East
12/21/06
260.1
Red. East
12/21/06
66.3
Red. East
12/21/06
140.5
Red. East
12/21/06
322.1
Red. East
12/21/06
628.3
Red. East
12/21/06
421.6
Red. East
12/21/06
166.8
Red. East
12/21/06
247.5
Red. East
12/21/06
209.7
Red. East
12/21/06
310.5
Red. East
12/21/06
385
Red. East
12/21/06
333.6
Red. East
12/21/06
348.8
Red. East
12/21/06
430.3
Red. East
12/21/06
441.8
Red. East
12/21/06
120.2
Red. East
12/21/06
141.2
Red. East
12/21/06
477.3
Red. East
12/21/06
762
Red. East
12/21/06
64.9
Red. East
12/21/06
209.9
Red. East
12/21/06
171.8
Red. East
12/21/06
171
Red. East
12/21/06
142
Red. East
12/21/06
188.7
Red. East
12/22/06
4
Red. East
12/22/06
154.7
Red. East
12/22/06
242.1
F-583

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
12/22/06
312.7
Red. East
12/22/06
142.7
Red. East
12/22/06
112.5
Red. East
12/22/06
260.3
Red. East
12/22/06
674.6
Red. East
12/22/06
678.8
Red. East
12/22/06
388.3
Red. East
12/22/06
178.6
Red. East
12/22/06
227
Red. East
12/22/06
173.2
Red. East
12/22/06
162.8
Red. East
12/22/06
308.3
Red. East
12/22/06
393.7
Red. East
12/22/06
427.4
Red. East
12/22/06
335
Red. East
12/22/06
336.8
Red. East
12/22/06
322.6
Red. East
12/22/06
149.6
Red. East
12/22/06
193.4
Red. East
12/22/06
312.5
Red. East
12/22/06
542.1
Red. East
12/22/06
613.3
Red. East
12/22/06
254
Red. East
12/22/06
204.7
Red. East
12/22/06
184.3
Red. East
12/22/06
305.9
Red. East
12/22/06
377.9
Red. East
12/22/06
282.8
Red. East
12/22/06
529
Red. East
12/22/06
403
Red. East
12/22/06
376.3
Red. East
12/22/06
306.8
Red. East
12/22/06
264.2
Red. East
12/22/06
181.6
Red. East
12/22/06
230.5
Red. East
12/22/06
369.6
Red. East
12/22/06
233.2
Red. East
12/22/06
361.7
Red. East
12/22/06
8
Red. East
12/23/06
258.6
Red. East
12/23/06
269.3
Red. East
12/23/06
129.1
Red. East
12/23/06
92.1
Red. East
12/23/06
186
Red. East
12/23/06
415.9
F-584

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
12/23/06
625.1
Red. East
12/23/06
656.1
Red. East
12/23/06
178.6
Red. East
12/23/06
137.3
Red. East
12/23/06
194.4
Red. East
12/23/06
479.1
Red. East
12/23/06
775.6
Red. East
12/23/06
497
Red. East
12/23/06
231.1
Red. East
12/23/06
182.7
Red. East
12/23/06
255.5
Red. East
12/23/06
345.8
Red. East
12/23/06
218.5
Red. East
12/23/06
265.8
Red. East
12/23/06
306
Red. East
12/23/06
120.6
Red. East
12/23/06
87.6
Red. East
12/23/06
189
Red. East
12/23/06
542.4
Red. East
12/23/06
770.3
Red. East
12/23/06
697.7
Red. East
12/23/06
204.1
Red. East
12/23/06
178.3
Red. East
12/23/06
209.1
Red. East
12/23/06
374.5
Red. East
12/23/06
298
Red. East
12/23/06
295.2
Red. East
12/23/06
300.9
Red. East
12/23/06
252
Red. East
12/23/06
381.1
Red. East
12/23/06
179.9
Red. East
12/23/06
206.3
Red. East
12/23/06
241.8
Red. East
12/23/06
155
Red. East
12/23/06
272.3
Red. East
12/23/06
9.7
Red. East
12/23/06
9.3
Red. East
12/23/06
4
Red. East
1 2/25/06
4
Red. East
1 2/25/06
116.2
Red. East
1 2/25/06
127.1
Red. East
1 2/25/06
185.5
Red. East
1 2/25/06
333
Red. East
1 2/25/06
329.6
Red. East
1 2/25/06
149.7
F-585

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/25/06
163.6
Red. East
1 2/25/06
378.8
Red. East
1 2/25/06
680.4
Red. East
1 2/25/06
456.4
Red. East
1 2/25/06
170.8
Red. East
1 2/25/06
107.5
Red. East
1 2/25/06
124.8
Red. East
1 2/25/06
311.3
Red. East
1 2/25/06
544.8
Red. East
1 2/25/06
711.5
Red. East
1 2/25/06
160.2
Red. East
1 2/25/06
197.4
Red. East
1 2/25/06
113.8
Red. East
1 2/25/06
142.1
Red. East
1 2/25/06
253
Red. East
1 2/25/06
329.9
Red. East
1 2/25/06
197.3
Red. East
1 2/26/06
291
Red. East
1 2/26/06
410.6
Red. East
1 2/26/06
314.2
Red. East
1 2/26/06
99.1
Red. East
1 2/26/06
148
Red. East
1 2/26/06
195.8
Red. East
1 2/26/06
158.1
Red. East
1 2/26/06
87.1
Red. East
1 2/26/06
107
Red. East
1 2/26/06
159.7
Red. East
1 2/26/06
269.2
Red. East
1 2/26/06
408.9
Red. East
1 2/26/06
418.7
Red. East
1 2/26/06
156.8
Red. East
1 2/26/06
78.1
Red. East
1 2/26/06
120.2
Red. East
1 2/26/06
308.9
Red. East
1 2/26/06
574.8
Red. East
1 2/26/06
480.3
Red. East
1 2/26/06
121.4
Red. East
1 2/26/06
130
Red. East
1 2/26/06
172.5
Red. East
1 2/26/06
229
Red. East
1 2/26/06
198.1
Red. East
1 2/26/06
271.4
Red. East
1 2/26/06
202
Red. East
1 2/26/06
143.1
Red. East
1 2/26/06
146.9
F-586

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/26/06
184.4
Red. East
1 2/26/06
202.8
Red. East
1 2/26/06
106.7
Red. East
1 2/26/06
46.6
Red. East
12/27/06
198.8
Red. East
12/27/06
249.4
Red. East
12/27/06
183.9
Red. East
12/27/06
93.7
Red. East
12/27/06
128.5
Red. East
12/27/06
165.9
Red. East
12/27/06
191.5
Red. East
12/27/06
312.3
Red. East
12/27/06
136.3
Red. East
12/27/06
93.4
Red. East
12/27/06
122.2
Red. East
12/27/06
230.7
Red. East
12/27/06
255.1
Red. East
12/27/06
323.8
Red. East
12/27/06
157.4
Red. East
12/27/06
153.6
Red. East
12/27/06
110.9
Red. East
12/27/06
77.6
Red. East
12/27/06
103.8
Red. East
12/27/06
174.9
Red. East
12/27/06
316.6
Red. East
12/27/06
349.3
Red. East
12/27/06
96.2
Red. East
12/27/06
119.2
Red. East
12/27/06
171.9
Red. East
12/27/06
166.1
Red. East
12/27/06
102.3
Red. East
12/27/06
94.5
Red. East
12/27/06
115.5
Red. East
12/27/06
83.1
Red. East
12/27/06
73.6
Red. East
12/27/06
110.3
Red. East
12/27/06
167.3
Red. East
12/27/06
216.3
Red. East
12/27/06
150.4
Red. East
12/27/06
196.3
Red. East
1 2/28/06
201.3
Red. East
1 2/28/06
245.9
Red. East
1 2/28/06
252.6
Red. East
1 2/28/06
123.1
Red. East
1 2/28/06
180.5
F-587

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/28/06
241.5
Red. East
1 2/28/06
219
Red. East
1 2/28/06
129.8
Red. East
1 2/28/06
117
Red. East
1 2/28/06
156.4
Red. East
1 2/28/06
238.5
Red. East
1 2/28/06
314.1
Red. East
1 2/28/06
251.2
Red. East
1 2/28/06
203.1
Red. East
1 2/28/06
204
Red. East
1 2/28/06
168.2
Red. East
1 2/28/06
109.1
Red. East
1 2/28/06
182.7
Red. East
1 2/28/06
273.4
Red. East
1 2/28/06
179.2
Red. East
1 2/28/06
144.4
Red. East
1 2/28/06
166.7
Red. East
1 2/28/06
265.5
Red. East
1 2/28/06
111.9
Red. East
1 2/28/06
139.3
Red. East
1 2/28/06
196
Red. East
1 2/28/06
279.3
Red. East
1 2/28/06
115.4
Red. East
1 2/28/06
148.9
Red. East
1 2/28/06
216.1
Red. East
1 2/28/06
171.6
Red. East
1 2/28/06
94.7
Red. East
1 2/28/06
85
Red. East
1 2/28/06
116.3
Red. East
1 2/28/06
96.5
Red. East
1 2/28/06
110.8
Red. East
1 2/28/06
237.8
Red. East
1 2/28/06
217.9
Red. East
1 2/28/06
156
Red. East
1 2/28/06
7.6
Red. East
1 2/28/06
7.6
Red. East
1 2/28/06
7.5
Red. East
1 2/28/06
7.4
Red. East
1 2/28/06
3.7
Red. East
1 2/29/06
374.9
Red. East
1 2/29/06
92.3
Red. East
1 2/29/06
130.9
Red. East
1 2/29/06
173.8
Red. East
1 2/29/06
336
Red. East
1 2/29/06
157.9
F-588

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/29/06
117.6
Red. East
1 2/29/06
179.1
Red. East
1 2/29/06
251.1
Red. East
1 2/29/06
311.7
Red. East
1 2/29/06
159.5
Red. East
1 2/29/06
155.1
Red. East
1 2/29/06
240.9
Red. East
1 2/29/06
237
Red. East
1 2/29/06
176.5
Red. East
1 2/29/06
110.1
Red. East
1 2/29/06
186.3
Red. East
1 2/29/06
181.3
Red. East
1 2/29/06
2.1
Red. East
1 2/30/06
99.8
Red. East
1 2/30/06
103.5
Red. East
1 2/30/06
137.4
Red. East
1 2/30/06
207
Red. East
1 2/30/06
293.1
Red. East
1 2/30/06
219.7
Red. East
1 2/30/06
108.8
Red. East
1 2/30/06
139.9
Red. East
1 2/30/06
234.4
Red. East
1 2/30/06
437.4
Red. East
1 2/30/06
689.1
Red. East
1 2/30/06
248.7
Red. East
1 2/30/06
204.9
Red. East
1 2/30/06
286
Red. East
1 2/30/06
316.7
Red. East
1 2/30/06
246.7
Red. East
1 2/30/06
86.2
Red. East
1 2/30/06
190.4
Red. East
1 2/30/06
21.6
Red. East
01/01/07
149
Red. East
01/01/07
156.6
Red. East
01/01/07
115.5
Red. East
01/01/07
95.2
Red. East
01/01/07
105.3
Red. East
01/01/07
120.3
Red. East
01/01/07
150.8
Red. East
01/01/07
197.5
Red. East
01/01/07
245.1
Red. East
01/01/07
345.3
Red. East
01/01/07
135.1
Red. East
01/01/07
133.4
Red. East
01/01/07
192.8
F-589

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/01/07
190.5
Red. East
01/01/07
6.9
Red. East
01/01/07
6.4
Red. East
01/01/07
4.3
Red. East
01/01/07
3.2
Red. East
01/02/07
206.9
Red. East
01/02/07
291
Red. East
01/02/07
411.8
Red. East
01/02/07
570.6
Red. East
01/02/07
744.6
Red. East
01/02/07
918.4
Red. East
01/02/07
283.4
Red. East
01/02/07
290.9
Red. East
01/02/07
512.7
Red. East
01/02/07
535.9
Red. East
01/02/07
193
Red. East
01/02/07
76.8
Red. East
01/02/07
85.7
Red. East
01/02/07
179
Red. East
01/02/07
401.4
Red. East
01/02/07
550.3
Red. East
01/02/07
768.6
Red. East
01/02/07
789.9
Red. East
01/02/07
185.3
Red. East
01/02/07
294.7
Red. East
01/02/07
583.6
Red. East
01/02/07
575.7
Red. East
01/02/07
692
Red. East
01/02/07
248.8
Red. East
01/02/07
118.9
Red. East
01/02/07
192.1
Red. East
01/02/07
314.7
Red. East
01/02/07
513.1
Red. East
01/02/07
729.6
Red. East
01/02/07
681.9
Red. East
01/02/07
120.2
Red. East
01/02/07
166.9
Red. East
01/02/07
210.5
Red. East
01/02/07
358.2
Red. East
01/02/07
437.4
Red. East
01/02/07
217.5
Red. East
01/02/07
171
Red. East
01/02/07
200.8
Red. East
01/02/07
232.6
Red. East
01/02/07
302.7
F-590

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/02/07
251.9
Red. East
01/02/07
183
Red. East
01/02/07
253.9
Red. East
01/02/07
188
Red. East
01/02/07
163.6
Red. East
01/02/07
184.3
Red. East
01/02/07
237.3
Red. East
01/02/07
321.7
Red. East
01/02/07
451
Red. East
01/02/07
273.1
Red. East
01/02/07
127.1
Red. East
01/02/07
155.1
Red. East
01/02/07
157.7
Red. East
01/02/07
201.4
Red. East
01/02/07
229.5
Red. East
01/02/07
130.8
Red. East
01/02/07
132.7
Red. East
01/02/07
141.6
Red. East
01/02/07
142.3
Red. East
01/02/07
157.3
Red. East
01/02/07
217.1
Red. East
01/02/07
113.5
Red. East
01/03/07
465.6
Red. East
01/03/07
821
Red. East
01/03/07
361.4
Red. East
01/03/07
90.4
Red. East
01/03/07
160.5
Red. East
01/03/07
298.4
Red. East
01/03/07
216.3
Red. East
01/03/07
101.7
Red. East
01/03/07
58
Red. East
01/03/07
75.2
Red. East
01/03/07
110.5
Red. East
01/03/07
39.2
Red. East
01/03/07
560.6
Red. East
01/03/07
59.9
Red. East
01/03/07
66.3
Red. East
01/03/07
82.4
Red. East
01/03/07
125
Red. East
01/03/07
258.2
Red. East
01/03/07
381.1
Red. East
01/03/07
601.2
Red. East
01/03/07
527.7
Red. East
01/03/07
158.5
Red. East
01/03/07
78.9
F-591

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/03/07
111.3
Red. East
01/03/07
76.9
Red. East
01/03/07
110
Red. East
01/03/07
179
Red. East
01/03/07
277.9
Red. East
01/03/07
235.9
Red. East
01/03/07
70.6
Red. East
01/03/07
54.1
Red. East
01/03/07
69.7
Red. East
01/03/07
104.1
Red. East
01/03/07
176.3
Red. East
01/03/07
339.9
Red. East
01/03/07
406.2
Red. East
01/03/07
654.6
Red. East
01/03/07
690.1
Red. East
01/03/07
184
Red. East
01/03/07
118.9
Red. East
01/03/07
156.9
Red. East
01/03/07
234.8
Red. East
01/03/07
227.8
Red. East
01/03/07
89.5
Red. East
01/03/07
69.8
Red. East
01/03/07
101.4
Red. East
01/03/07
145.5
Red. East
01/03/07
232.5
Red. East
01/03/07
449.9
Red. East
01/03/07
637.2
Red. East
01/03/07
663.1
Red. East
01/03/07
325.8
Red. East
01/03/07
134.4
Red. East
01/03/07
193.5
Red. East
01/03/07
260.3
Red. East
01/03/07
199.1
Red. East
01/03/07
126.8
Red. East
01/03/07
117.2
Red. East
01/03/07
126.1
Red. East
01/03/07
161.8
Red. East
01/03/07
220.2
Red. East
01/03/07
304.1
Red. East
01/03/07
378.5
Red. East
01/03/07
328.4
Red. East
01/03/07
147.8
Red. East
01/03/07
193.9
Red. East
01/03/07
291
Red. East
01/03/07
190.3
F-592

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/03/07
118.7
Red. East
01/03/07
111.5
Red. East
01/03/07
130.3
Red. East
01/03/07
176.2
Red. East
01/03/07
243.3
Red. East
01/03/07
347.4
Red. East
01/03/07
482.8
Red. East
01/03/07
227.4
Red. East
01/03/07
210.2
Red. East
01/03/07
357
Red. East
01/03/07
358.5
Red. East
01/03/07
515.4
Red. East
01/03/07
596.6
Red. East
01/03/07
365
Red. East
01/03/07
121.3
Red. East
01/03/07
121.8
Red. East
01/03/07
148.6
Red. East
01/04/07
158.3
Red. East
01/04/07
143.8
Red. East
01/04/07
125.9
Red. East
01/04/07
100.1
Red. East
01/04/07
169.6
Red. East
01/04/07
251.2
Red. East
01/04/07
288.3
Red. East
01/04/07
142.6
Red. East
01/04/07
152.8
Red. East
01/04/07
168
Red. East
01/04/07
200.5
Red. East
01/04/07
161.7
Red. East
01/04/07
212.9
Red. East
01/04/07
246.6
Red. East
01/04/07
167.9
Red. East
01/04/07
69.6
Red. East
01/04/07
126.8
Red. East
01/04/07
277.1
Red. East
01/04/07
431.4
Red. East
01/04/07
620.3
Red. East
01/04/07
314.5
Red. East
01/04/07
123.8
Red. East
01/04/07
120.5
Red. East
01/04/07
135.7
Red. East
01/04/07
161.6
Red. East
01/04/07
197.6
Red. East
01/04/07
211.3
Red. East
01/04/07
119.8
F-593

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/04/07
134.6
Red. East
01/04/07
148.4
Red. East
01/04/07
162.3
Red. East
01/04/07
245.6
Red. East
01/04/07
123
Red. East
01/04/07
48.6
Red. East
01/04/07
64.9
Red. East
01/04/07
141.8
Red. East
01/04/07
322.3
Red. East
01/04/07
299.5
Red. East
01/04/07
476.2
Red. East
01/04/07
370.2
Red. East
01/04/07
185.9
Red. East
01/04/07
117.3
Red. East
01/04/07
90.4
Red. East
01/04/07
85.1
Red. East
01/04/07
61.5
Red. East
01/04/07
82.9
Red. East
01/04/07
173.5
Red. East
01/04/07
321.6
Red. East
01/05/07
74.7
Red. East
01/05/07
4.1
Red. East
01/05/07
2
Red. East
01/06/07
142
Red. East
01/06/07
96.7
Red. East
01/06/07
100.7
Red. East
01/06/07
155.6
Red. East
01/06/07
186.1
Red. East
01/06/07
184.8
Red. East
01/06/07
100.9
Red. East
01/06/07
107.1
Red. East
01/06/07
135.9
Red. East
01/06/07
195.7
Red. East
01/06/07
261.3
Red. East
01/06/07
493.4
Red. East
01/06/07
422.4
Red. East
01/06/07
120
Red. East
01/06/07
111.6
Red. East
01/06/07
82.2
Red. East
01/06/07
99.1
Red. East
01/06/07
344.4
Red. East
01/06/07
620.9
Red. East
01/06/07
826.7
Red. East
01/06/07
784
Red. East
01/06/07
194.7
F-594

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/06/07
155.7
Red. East
01/06/07
176.1
Red. East
01/06/07
259.6
Red. East
01/06/07
326
Red. East
01/06/07
227.2
Red. East
01/06/07
87.6
Red. East
01/06/07
128.4
Red. East
01/06/07
468.4
Red. East
01/06/07
575.7
Red. East
01/06/07
853.6
Red. East
01/06/07
86.9
Red. East
01/06/07
319.6
Red. East
01/06/07
328.5
Red. East
01/06/07
185.1
Red. East
01/06/07
81
Red. East
01/06/07
83.6
Red. East
01/06/07
207.2
Red. East
01/06/07
883.3
Red. East
01/06/07
62.3
Red. East
01/06/07
7.9
Red. East
01/06/07
265.2
Red. East
01/06/07
170.3
Red. East
01/06/07
248.3
Red. East
01/06/07
382.8
Red. East
01/06/07
523.3
Red. East
01/06/07
435.7
Red. East
01/06/07
147.9
Red. East
01/06/07
74.4
Red. East
01/06/07
122.2
Red. East
01/06/07
254.6
Red. East
01/06/07
547.7
Red. East
01/06/07
406.2
Red. East
01/06/07
581.5
Red. East
01/06/07
166.6
Red. East
01/06/07
201.3
Red. East
01/06/07
300.6
Red. East
01/06/07
348.2
Red. East
01/06/07
162
Red. East
01/06/07
102.3
Red. East
01/06/07
143.1
Red. East
01/06/07
291
Red. East
01/06/07
710.9
Red. East
01/06/07
258
Red. East
01/07/07
156.2
Red. East
01/07/07
198.6
F-595

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/07/07
249.2
Red. East
01/07/07
277.6
Red. East
01/07/07
207.5
Red. East
01/07/07
210.7
Red. East
01/07/07
236.8
Red. East
01/07/07
365.5
Red. East
01/07/07
207.1
Red. East
01/07/07
192.2
Red. East
01/07/07
191.4
Red. East
01/07/07
205.9
Red. East
01/07/07
236.2
Red. East
01/07/07
279.8
Red. East
01/07/07
293.5
Red. East
01/07/07
210.6
Red. East
01/07/07
268.2
Red. East
01/07/07
239.7
Red. East
01/07/07
176
Red. East
01/07/07
189.9
Red. East
01/07/07
217.2
Red. East
01/07/07
270.9
Red. East
01/07/07
183
Red. East
01/07/07
113.1
Red. East
01/07/07
50.4
Red. East
01/07/07
9.7
Red. East
01/07/07
3
Red. East
01/10/07
3.4
Red. East
01/10/07
91.6
Red. East
01/10/07
206.3
Red. East
01/10/07
166
Red. East
01/10/07
179.7
Red. East
01/10/07
205.2
Red. East
01/10/07
254.7
Red. East
01/10/07
342
Red. East
01/10/07
186.8
Red. East
01/10/07
260.8
Red. East
01/10/07
353
Red. East
01/10/07
502.5
Red. East
01/10/07
684.3
Red. East
01/10/07
657.2
Red. East
01/10/07
176.7
Red. East
01/10/07
202.8
Red. East
01/10/07
155.5
Red. East
01/10/07
153.9
Red. East
01/10/07
170.8
Red. East
01/10/07
191.7
F-596

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/10/07
251.3
Red. East
01/10/07
158
Red. East
01/10/07
161.4
Red. East
01/10/07
160.3
Red. East
01/10/07
148.8
Red. East
01/10/07
144.1
Red. East
01/10/07
6.8
Red. East
01/19/07
58.7
Red. East
01/19/07
124.5
Red. East
01/19/07
159.5
Red. East
01/19/07
124.6
Red. East
01/19/07
138.1
Red. East
01/19/07
68.8
Red. East
01/20/07
231.9
Red. East
01/20/07
186
Red. East
01/20/07
196.4
Red. East
02/05/07
7.8
Red. East
02/05/07
156.4
Red. East
02/05/07
121.9
Red. East
02/05/07
143.8
Red. East
02/05/07
152.5
Red. East
02/05/07
153.8
Red. East
02/05/07
151.9
Red. East
02/05/07
227.1
Red. East
02/1 2/07
174.9
Red. East
02/1 2/07
178.4
Red. East
02/1 2/07
203.7
Red. East
02/1 2/07
184.1
Red. East
02/1 2/07
236.9
Red. East
02/1 2/07
202.8
Red. East
02/1 2/07
49.3
Red. East
02/15/07
5.6
Red. East
02/15/07
201.2
Red. East
02/15/07
194.1
Red. East
02/15/07
205.6
Red. East
02/15/07
195.4
Red. East
02/15/07
7.3
Red. East
02/15/07
7
Red. East
02/19/07
5.5
Red. East
02/19/07
153.5
Red. East
02/19/07
185.6
Red. East
02/19/07
250.1
Red. East
02/19/07
304.2
Red. East
02/19/07
335.8
Red. East
02/19/07
160.8
F-597

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
02/19/07
146.2
Red. East
02/19/07
175
Red. East
02/19/07
219
Red. East
02/19/07
271
Red. East
02/19/07
328.6
Red. East
02/19/07
382.6
Red. East
02/19/07
446.7
Red. East
02/19/07
181.4
Red. East
02/19/07
275.5
Red. East
02/19/07
273.3
Red. East
02/19/07
213.3
Red. East
02/19/07
248.3
Red. East
02/19/07
231.7
Red. East
02/19/07
170
Red. East
02/19/07
8.1
Red. East
02/20/07
5.5
Red. East
02/20/07
101.2
Red. East
02/20/07
123.3
Red. East
02/20/07
128
Red. East
02/20/07
144.1
Red. East
02/20/07
165.4
Red. East
02/20/07
194.2
Red. East
02/20/07
271.9
Red. East
02/20/07
294.2
Red. East
02/20/07
337.4
Red. East
02/20/07
370
Red. East
02/20/07
444.5
Red. East
02/20/07
499.7
Red. East
02/20/07
507.9
Red. East
02/20/07
538.3
Red. East
02/20/07
484.9
Red. East
02/20/07
509.5
Red. East
02/20/07
360.8
Red. East
02/20/07
165.3
Red. East
02/20/07
159.3
Red. East
02/20/07
206.7
Red. East
02/20/07
265.7
Red. East
02/20/07
326.6
Red. East
02/20/07
379.1
Red. East
02/20/07
443.7
Red. East
02/20/07
383.4
Red. East
02/20/07
182.5
Red. East
02/20/07
246
Red. East
02/20/07
316
Red. East
02/20/07
404.3
F-598

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
02/20/07
442.8
Red. East
02/20/07
210
Red. East
02/21/07
5.7
Red. East
02/21/07
80.8
Red. East
02/21/07
211.6
Red. East
02/21/07
212.4
Red. East
02/21/07
221.2
Red. East
02/21/07
229.3
Red. East
02/21/07
234.8
Red. East
02/21/07
235.8
Red. East
02/21/07
383.4
Red. East
02/21/07
7
Red. East
02/22/07
35.4
Red. East
02/22/07
126.6
Red. East
02/22/07
177.7
Red. East
02/22/07
240.4
Red. East
02/22/07
347.8
Red. East
02/22/07
404.8
Red. East
02/22/07
453
Red. East
02/22/07
496.6
Red. East
02/22/07
531.4
Red. East
02/22/07
562.5
Red. East
02/22/07
509.7
Red. East
02/22/07
166.3
Red. East
02/22/07
156.5
Red. East
02/22/07
205.5
Red. East
02/22/07
242.1
Red. East
02/22/07
285
Red. East
02/22/07
209.4
Red. East
02/22/07
118
Red. East
02/22/07
133
Red. East
02/22/07
162.4
Red. East
02/22/07
202.6
Red. East
02/22/07
241.7
Red. East
02/22/07
284.3
Red. East
02/22/07
322.4
Red. East
02/22/07
357.1
Red. East
02/22/07
377.7
Red. East
02/22/07
395.7
Red. East
02/22/07
379.1
Red. East
02/22/07
163.4
Red. East
02/22/07
208.1
Red. East
02/22/07
253.2
Red. East
02/22/07
295.5
Red. East
02/22/07
336.3
F-599

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
02/22/07
368.4
Red. East
02/22/07
316
Red. East
02/26/07
5.3
Red. East
02/26/07
92.6
Red. East
02/26/07
96.5
Red. East
02/26/07
119.4
Red. East
02/26/07
183.6
Red. East
02/26/07
179.4
Red. East
02/26/07
130.8
Red. East
02/26/07
95.1
Red. East
02/26/07
100.9
Red. East
02/26/07
216.8
Red. East
02/26/07
416.2
Red. East
02/26/07
423.4
Red. East
02/26/07
431.4
Red. East
02/26/07
439
Red. East
02/26/07
448.1
Red. East
02/26/07
408.4
Red. East
02/26/07
368.7
Red. East
02/26/07
148.2
Red. East
02/26/07
169.6
Red. East
02/26/07
196.2
Red. East
02/26/07
217.6
Red. East
02/26/07
237.7
Red. East
02/26/07
259.2
Red. East
02/26/07
225.5
Red. East
02/26/07
122.6
Red. East
02/27/07
111.7
Red. East
02/27/07
118.9
Red. East
02/27/07
166.9
Red. East
02/27/07
240.7
Red. East
02/27/07
209.5
Red. East
02/27/07
109.6
Red. East
02/27/07
114.7
Red. East
02/27/07
134.1
Red. East
02/27/07
167.3
Red. East
02/27/07
198
Red. East
02/27/07
229.2
Red. East
02/27/07
268.4
Red. East
02/27/07
203.8
Red. East
02/27/07
118
Red. East
02/27/07
137.5
Red. East
02/27/07
184.4
Red. East
02/27/07
171.1
Red. East
02/27/07
58.7
F-600

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
02/27/07
9
Red. East
02/27/07
9
Red. East
03/02/07
186.4
Red. East
03/02/07
234.5
Red. East
03/02/07
295.7
Red. East
03/02/07
370
Red. East
03/02/07
443.7
Red. East
03/02/07
313.8
Red. East
03/02/07
70
Red. East
03/02/07
98.4
Red. East
03/02/07
132.8
Red. East
03/02/07
193.8
Red. East
03/02/07
268.7
Red. East
03/02/07
378.7
Red. East
03/02/07
483.1
Red. East
03/02/07
575.3
Red. East
03/02/07
634.7
Red. East
03/02/07
629.1
Red. East
03/02/07
686.7
Red. East
03/02/07
711.7
Red. East
03/02/07
638.6
Red. East
03/02/07
128.5
Red. East
03/02/07
183.2
Red. East
03/02/07
247
Red. East
03/02/07
297.3
Red. East
03/02/07
362.3
Red. East
03/02/07
427.4
Red. East
03/02/07
507.1
Red. East
03/02/07
533.6
Red. East
03/02/07
198.7
Red. East
03/02/07
6.5
Red. East
03/03/07
285.7
Red. East
03/03/07
274.3
Red. East
03/03/07
289.2
Red. East
03/03/07
108.5
Red. East
03/03/07
209.9
Red. East
03/03/07
262.1
Red. East
03/03/07
252.3
Red. East
03/03/07
245.3
Red. East
03/03/07
747.8
Red. East
03/03/07
733.3
Red. East
03/03/07
783.2
Red. East
03/03/07
695.9
Red. East
03/03/07
237.4
Red. East
03/03/07
76.5
F-601

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
03/03/07
124.4
Red. East
03/03/07
83.4
Red. East
03/03/07
143.1
Red. East
03/03/07
147
Red. East
03/03/07
149.1
Red. East
03/03/07
173.7
Red. East
03/03/07
112.3
Red. East
03/06/07
247.3
Red. East
03/06/07
320.3
Red. East
03/06/07
537.6
Red. East
03/06/07
509.1
Red. East
03/06/07
200
Red. East
03/06/07
57.1
Red. East
03/06/07
164.7
Red. East
03/06/07
609
Red. East
03/06/07
513.5
Red. East
03/06/07
277.4
Red. East
03/06/07
384.1
Red. East
03/06/07
191.3
Red. East
03/06/07
292.8
Red. East
03/06/07
802.2
Red. East
03/06/07
828.6
Red. East
03/06/07
831.7
Red. East
03/06/07
583.3
Red. East
03/06/07
158.9
Red. East
03/06/07
133
Red. East
03/06/07
160.9
Red. East
03/06/07
31.7
Red. East
03/06/07
319.6
Red. East
03/06/07
320.4
Red. East
03/06/07
460.7
Red. East
03/06/07
177.6
Red. East
03/06/07
8.5
Red. East
03/07/07
49.4
Red. East
03/07/07
153.4
Red. East
03/07/07
152.2
Red. East
03/07/07
590.8
Red. East
03/07/07
486.6
Red. East
03/07/07
688.7
Red. East
03/07/07
799.5
Red. East
03/07/07
564.5
Red. East
03/07/07
97.8
Red. East
03/07/07
150.7
Red. East
03/07/07
420.7
Red. East
03/07/07
401.4
F-602

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
03/07/07
600.3
Red. East
03/07/07
741.6
Red. East
03/07/07
724.9
Red. East
03/07/07
433.9
Red. East
03/07/07
185.3
Red. East
03/07/07
195.2
Red. East
03/07/07
402.5
Red. East
03/07/07
383.9
Red. East
03/07/07
816.4
Red. East
03/07/07
816.5
Red. East
03/07/07
465.6
Red. East
03/07/07
114.6
Red. East
03/07/07
219
Red. East
03/07/07
307.2
Red. East
03/07/07
293.3
Red. East
03/07/07
247.6
Red. East
03/08/07
169.5
Red. East
03/08/07
117.8
Red. East
03/08/07
310.2
Red. East
03/08/07
797.8
Red. East
03/08/07
401.7
Red. East
03/08/07
818.5
Red. East
03/08/07
835.3
Red. East
03/08/07
962.8
Red. East
03/08/07
979.2
Red. East
03/08/07
781.6
Red. East
03/08/07
753.2
Red. East
03/08/07
732.7
Red. East
03/08/07
672.8
Red. East
03/08/07
201.7
Red. East
03/08/07
173
Red. East
03/08/07
251.9
Red. East
03/08/07
228.8
Red. East
03/08/07
616.9
Red. East
03/08/07
573.4
Red. East
03/08/07
751.7
Red. East
03/08/07
807.5
Red. East
03/08/07
728.1
Red. East
03/08/07
840.9
Red. East
03/08/07
847.5
Red. East
03/08/07
384.1
Red. East
03/08/07
822.1
Red. East
03/08/07
803.7
Red. East
03/08/07
548
Red. East
03/08/07
772.7
F-603

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
03/08/07
695.5
Red. East
03/08/07
810.7
Red. East
03/08/07
825.3
Red. East
03/08/07
561.5
Red. East
03/08/07
120.8
Red. East
03/08/07
124
Red. East
03/08/07
86
Red. East
03/09/07
616.9
Red. East
03/09/07
259.3
Red. East
03/09/07
299.9
Red. East
03/09/07
249.9
Red. East
03/09/07
360.6
Red. East
03/09/07
290.2
Red. East
03/09/07
519.7
Red. East
03/09/07
402.6
Red. East
03/09/07
527.3
Red. East
03/09/07
484
Red. East
03/09/07
299.4
Red. East
03/09/07
263.6
Red. East
03/09/07
402
Red. East
03/09/07
566.4
Red. East
03/09/07
138.1
Red. East
03/09/07
196.8
Red. East
03/09/07
570.1
Red. East
03/09/07
562.5
Red. East
03/09/07
560.2
Red. East
03/09/07
601.3
Red. East
03/09/07
750.4
Red. East
03/09/07
500.5
Red. East
03/09/07
505.1
Red. East
03/09/07
161
Red. East
03/09/07
113.8
Red. East
03/09/07
155.1
Red. East
03/09/07
136.7
Red. East
03/09/07
86.1
Red. East
03/10/07
210.6
Red. East
03/10/07
163.2
Red. East
03/10/07
65.1
Red. East
03/10/07
576.9
Red. East
03/10/07
702
Red. East
03/10/07
507.7
Red. East
03/10/07
638.9
Red. East
03/10/07
595.9
Red. East
03/10/07
119.9
Red. East
03/10/07
222.5
F-604

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
03/10/07
564.1
Red. East
03/10/07
557.6
Red. East
03/10/07
585.1
Red. East
03/10/07
482.5
Red. East
03/10/07
489.2
Red. East
03/10/07
238.5
Red. East
03/10/07
144.1
Red. East
03/10/07
181.2
Red. East
03/10/07
214.9
Red. East
03/10/07
96.3
Red. East
03/10/07
395.5
Red. East
03/10/07
414.6
Red. East
03/10/07
297.1
Red. East
03/10/07
395.4
Red. East
03/10/07
835.5
Red. East
03/10/07
790.3
Red. East
03/10/07
429
Red. East
03/10/07
759.3
Red. East
03/10/07
592
Red. East
03/10/07
659.3
Red. East
03/10/07
320.5
Red. East
03/10/07
94.6
Red. East
03/11/07
51.8
Red. East
03/11/07
118.5
Red. East
03/11/07
146.4
Red. East
03/11/07
156.9
Red. East
03/11/07
886.5
Red. East
03/11/07
829.4
Red. East
03/11/07
446.1
Red. East
03/11/07
228.2
Red. East
03/11/07
818.9
Red. East
03/11/07
847.3
Red. East
03/11/07
121.8
Red. East
03/11/07
6.5
Red. East
03/1 2/07
352.2
Red. East
03/1 2/07
172.4
Red. East
03/1 2/07
137
Red. East
03/1 2/07
138.8
Red. East
03/1 2/07
73.5
Red. East
03/1 2/07
60.4
Red. East
03/1 2/07
42.2
Red. East
03/1 2/07
47.1
Red. East
03/1 2/07
88.3
Red. East
03/1 2/07
367.2
Red. East
03/1 2/07
365.7
F-605

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
03/1 2/07
219.9
Red. East
03/1 2/07
38.8
Red. East
03/1 2/07
82.9
Red. East
03/1 2/07
127.9
Red. East
03/1 2/07
433.3
Red. East
03/1 2/07
327.3
Red. East
03/1 2/07
64.7
Red. East
03/1 2/07
82.1
Red. East
03/1 2/07
690.1
Red. East
03/1 2/07
619.7
Red. East
03/1 2/07
509.3
Red. East
03/1 2/07
705.9
Red. East
03/1 2/07
673.2
Red. East
03/1 2/07
694.2
Red. East
03/1 2/07
699.1
Red. East
03/1 2/07
582.6
Red. East
03/1 2/07
7
Red. East
03/1 2/07
6.9
Red. East
03/1 3/07
169.1
Red. East
03/1 3/07
134.8
Red. East
03/1 3/07
481.5
Red. East
03/1 3/07
264.7
Red. East
03/1 3/07
42.9
Red. East
03/1 3/07
107.8
Red. East
03/1 3/07
151.7
Red. East
03/1 3/07
252.2
Red. East
03/1 3/07
431.7
Red. East
03/1 3/07
476.1
Red. East
03/1 3/07
386.4
Red. East
03/1 3/07
132.5
Red. East
03/1 3/07
135.8
Red. East
03/1 3/07
47.9
Red. East
03/1 3/07
60.5
Red. East
03/1 3/07
90.7
Red. East
03/1 3/07
140
Red. East
03/1 3/07
208.7
Red. East
03/1 3/07
242.8
Red. East
03/1 3/07
225.7
Red. East
03/1 3/07
63.6
Red. East
03/15/07
43
Red. East
03/15/07
57.3
Red. East
03/15/07
68
Red. East
03/15/07
104.6
Red. East
03/15/07
248.4
Red. East
03/15/07
278.4
F-606

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
03/15/07
714.2
Red. East
03/15/07
350.5
Red. East
03/15/07
130.6
Red. East
03/15/07
153
Red. East
03/15/07
201.4
Red. East
03/15/07
239.5
Red. East
03/15/07
246.4
Red. East
03/15/07
195.9
Red. East
03/15/07
173
Red. East
03/15/07
199.7
Red. East
03/15/07
344.4
Red. East
03/15/07
286.7
Red. East
03/15/07
47.6
Red. East
03/20/07
45.2
Red. East
03/20/07
56.1
Red. East
03/20/07
68.9
Red. East
03/20/07
110.8
Red. East
03/20/07
436
Red. East
03/20/07
514
Red. East
03/20/07
44.9
Red. East
03/20/07
38.8
Red. East
03/20/07
46.8
Red. East
03/20/07
124.3
Red. East
03/20/07
380.4
Red. East
03/20/07
320.6
Red. East
03/20/07
199.2
Red. East
03/20/07
279.3
Red. East
03/20/07
239.4
Red. East
03/20/07
84.5
Red. East
03/20/07
14.9
Red. East
03/20/07
22.4
Red. East
03/20/07
6.5
Red. East
03/23/07
68
Red. East
03/23/07
68.9
Red. East
03/23/07
76.5
Red. East
03/23/07
122.1
Red. East
03/23/07
105
Red. East
03/23/07
104.9
Red. East
03/23/07
109.7
Red. East
03/23/07
85.5
Red. East
03/23/07
84.3
Red. East
03/23/07
81.2
Red. East
03/24/07
66.3
Red. East
03/24/07
70.3
Red. East
03/24/07
69.8
F-607

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
03/24/07
76.2
Red. East
03/24/07
64.1
Red. East
03/24/07
65
Red. East
03/24/07
64.9
Red. East
03/24/07
78.2
Red. East
03/24/07
63.9
Red. East
03/24/07
57.4
Red. East
03/24/07
54.2
Red. East
03/24/07
80.5
Red. East
03/24/07
73.9
Red. East
03/24/07
57.6
Red. East
03/24/07
49.2
Red. East
03/24/07
55.3
Red. East
03/24/07
60.8
Red. East
03/24/07
61.3
Red. East
03/24/07
59.5
Red. East
03/24/07
90.2
Red. East
03/29/07
58.5
Red. East
03/29/07
55.4
Red. East
03/29/07
53.5
Red. East
03/29/07
50
Red. East
03/29/07
54
Red. East
03/29/07
40.9
Red. East
03/29/07
50.2
Red. East
03/29/07
44.1
Red. East
03/29/07
48.7
Red. East
03/29/07
51.7
Red. East
03/29/07
99
Red. East
03/30/07
16.2
Red. East
03/30/07
16.2
Red. East
03/30/07
16.3
Red. East
03/30/07
16.2
Red. East
04/11/07
49.9
Red. East
04/11/07
46.7
Red. East
04/11/07
8.8
Red. East
04/1 2/07
118.7
Red. East
04/1 2/07
85.3
Red. East
04/1 2/07
104.6
Red. East
04/1 2/07
97.8
Red. East
04/1 2/07
75.3
Red. East
04/1 2/07
59.3
Red. East
04/1 2/07
60.7
Red. East
04/1 2/07
90.9
Red. East
04/1 2/07
58.1
Red. East
04/1 2/07
77
F-608

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
04/1 2/07
51.6
Red. East
04/1 2/07
42.4
Red. East
04/1 2/07
37.9
Red. East
04/1 2/07
19.1
Red. East
04/1 2/07
7
Red. East
04/1 2/07
7.1
Red. East
04/19/07
126
Red. East
04/19/07
130.6
Red. East
04/19/07
120.7
Red. East
04/19/07
130.8
Red. East
04/19/07
112.3
Red. East
04/19/07
115.3
Red. East
04/19/07
110.3
Red. East
04/19/07
140.3
Red. East
04/19/07
118.6
Red. East
04/19/07
119.4
Red. East
04/19/07
123.6
Red. East
04/19/07
151.3
Red. East
04/19/07
126.2
Red. East
04/19/07
100.1
Red. East
04/19/07
94.4
Red. East
04/19/07
86.1
Red. East
04/19/07
73.2
Red. East
04/19/07
59.6
Red. East
04/19/07
32.8
Red. East
04/19/07
16.6
Red. East
04/19/07
16.5
Red. East
04/19/07
5.3
Red. East
04/19/07
5.4
Red. East
04/19/07
5.2
Red. East
04/19/07
5.5
Red. East
04/19/07
5.2
Red. East
05/09/07
5.4
Red. East
05/09/07
5.3
Red. East
05/24/07
5.7
Red. East
05/24/07
5.5
Red. East
05/24/07
63.4
Red. East
05/24/07
61.8
Red. East
05/24/07
50.2
Red. East
05/24/07
49.4
Red. East
05/24/07
61.6
Red. East
05/24/07
49.2
Red. East
05/24/07
41.4
Red. East
05/24/07
38.1
Red. East
05/24/07
99.2
F-609

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
05/24/07
42.8
Red. East
05/24/07
39.9
Red. East
05/24/07
37.2
Red. East
05/24/07
35.9
Red. East
05/24/07
31.1
Red. East
05/24/07
29.9
Red. East
05/24/07
CO
CO
CO
Red. East
05/24/07
9.5
Red. East
05/24/07
9.5
Red. East
05/24/07
9.6
Red. East
05/24/07
9.3
Red. East
06/01/07
22.7
Red. East
06/01/07
17.9
Red. East
06/01/07
100.6
Red. East
06/01/07
9.8
Red. East
06/01/07
10
Red. East
06/01/07
10.4
Red. East
06/01/07
17.1
Red. East
06/01/07
12.4
Red. East
06/01/07
37.2
Red. East
06/01/07
11.2
Red. East
06/01/07
47.5
Red. East
06/01/07
34.1
Red. East
06/01/07
55.2
Red. East
06/01/07
58.5
Red. East
06/01/07
257.3
Red. East
06/01/07
6.2
Red. East
06/01/07
4.2
Red. East
07/22/07
7.6
Red. East
07/22/07
6.3
Red. East
07/22/07
8.1
Red. East
07/22/07
11.4
Red. East
07/22/07
6.3
Red. East
07/22/07
6.2
Red. East
07/23/07
164.5
Red. East
07/23/07
236.8
Red. East
07/23/07
63.5
Red. East
07/23/07
211.3
Red. East
07/23/07
247.2
Red. East
07/23/07
180.4
Red. East
07/23/07
143.2
Red. East
07/23/07
227.7
Red. East
07/23/07
49.2
Red. East
07/23/07
43.9
Red. East
07/23/07
45.9
F-610

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
07/23/07
32
Red. East
07/23/07
4.5
Red. East
08/15/07
9.3
Red. East
08/15/07
6.5
Red. East
08/15/07
5.3
Red. East
08/15/07
3.7
Red. East
08/21/07
10.7
Red. East
08/21/07
143.7
Red. East
08/21/07
97.5
Red. East
08/21/07
62.1
Red. East
08/21/07
61.1
Red. East
08/21/07
134
Red. East
08/21/07
108.6
Red. East
08/21/07
60.7
Red. East
08/21/07
94
Red. East
08/21/07
105.7
Red. East
08/21/07
8.8
Red. East
08/21/07
8.8
Red. East
08/21/07
9
Red. East
08/21/07
8.9
Red. East
08/21/07
8.9
Red. East
08/21/07
8.8
Red. East
08/21/07
9
Red. East
08/21/07
10.1
Red. East
08/22/07
15.1
Red. East
08/22/07
15
Red. East
08/22/07
11.2
Red. East
08/22/07
12
Red. East
08/22/07
13.4
Red. East
08/22/07
19.4
Red. East
08/22/07
32
Red. East
08/22/07
15.7
Red. East
08/22/07
16.4
Red. East
08/22/07
60.7
Red. East
08/22/07
24.5
Red. East
08/22/07
22.5
Red. East
08/22/07
28.3
Red. East
08/22/07
34
Red. East
08/22/07
95.6
Red. East
08/22/07
87.7
Red. East
08/22/07
334.7
Red. East
08/22/07
10.8
Red. East
08/22/07
11
Red. East
08/23/07
4.7
Red. East
08/23/07
5.7
F-611

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
08/23/07
26.3
Red. East
08/23/07
14.9
Red. East
08/23/07
13.7
Red. East
08/23/07
16.8
Red. East
08/23/07
23.3
Red. East
08/23/07
10.9
Red. East
08/23/07
8.7
Red. East
08/23/07
9.1
Red. East
08/23/07
8.9
Red. East
08/23/07
9.4
Red. East
08/23/07
10.6
Red. East
08/23/07
11.6
Red. East
08/23/07
13.4
Red. East
08/23/07
15.3
Red. East
08/23/07
18.6
Red. East
08/23/07
8.8
Red. East
09/05/07
151.6
Red. East
09/05/07
28.7
Red. East
09/05/07
21
Red. East
09/05/07
111.7
Red. East
09/05/07
112.9
Red. East
09/05/07
106.5
Red. East
09/05/07
10.5
Red. East
09/05/07
97
Red. East
09/05/07
12.8
Red. East
09/05/07
30.3
Red. East
09/05/07
26.8
Red. East
09/05/07
8.8
Red. East
09/07/07
104.1
Red. East
09/07/07
7.2
Red. East
09/07/07
20.3
Red. East
09/07/07
9.1
Red. East
09/07/07
12.6
Red. East
09/07/07
11.2
Red. East
09/07/07
27.6
Red. East
09/07/07
11.9
Red. East
09/07/07
7
Red. East
09/1 7/07
8.3
Red. East
09/21/07
11.9
Red. East
09/21/07
30.2
Red. East
09/21/07
12.9
Red. East
09/21/07
16.9
Red. East
09/21/07
4.2
Red. East
09/21/07
7.3
Red. East
09/21/07
14.2
F-612

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
09/21/07
6
Red. East
09/24/07
7.8
Red. East
09/24/07
8.1
Red. East
09/24/07
7.5
Red. East
09/24/07
6
Red. East
09/24/07
7.8
Red. East
09/24/07
6.6
Red. East
09/24/07
7.4
Red. East
10/01/07
106.1
Red. East
10/01/07
146
Red. East
10/01/07
114.3
Red. East
10/01/07
111.3
Red. East
10/01/07
135.8
Red. East
10/01/07
104.6
Red. East
10/01/07
133.3
Red. East
10/01/07
80
Red. East
10/01/07
81.1
Red. East
10/01/07
115.5
Red. East
10/01/07
88.2
Red. East
10/01/07
97.5
Red. East
10/01/07
85.7
Red. East
10/01/07
55.6
Red. East
10/01/07
38.7
Red. East
10/01/07
134.4
Red. East
10/01/07
83.2
Red. East
10/01/07
60.9
Red. East
10/01/07
16.2
Red. East
10/03/07
15.5
Red. East
10/03/07
75.7
Red. East
10/03/07
71.5
Red. East
10/03/07
131.7
Red. East
10/03/07
133
Red. East
10/03/07
101.5
Red. East
10/03/07
201.9
Red. East
10/03/07
138.4
Red. East
10/03/07
115
Red. East
10/03/07
99.5
Red. East
10/04/07
141.4
Red. East
10/04/07
126.9
Red. East
10/04/07
85.3
Red. East
10/04/07
44.5
Red. East
10/04/07
93.2
Red. East
10/04/07
92.3
Red. East
10/04/07
66.6
Red. East
10/04/07
51.6
F-613

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/04/07
70.8
Red. East
10/04/07
133.7
Red. East
10/04/07
98.3
Red. East
10/04/07
77.4
Red. East
10/04/07
27.7
Red. East
10/04/07
40.6
Red. East
10/1 2/07
108.1
Red. East
10/1 2/07
86.2
Red. East
10/1 2/07
47.7
Red. East
10/1 2/07
42.1
Red. East
10/1 2/07
87.7
Red. East
10/1 2/07
71.1
Red. East
10/1 2/07
45.3
Red. East
10/1 2/07
38.2
Red. East
10/1 2/07
7
Red. East
10/15/07
217.3
Red. East
10/15/07
55.6
Red. East
10/15/07
52.1
Red. East
10/15/07
43.3
Red. East
10/15/07
355.2
Red. East
10/15/07
119.2
Red. East
10/15/07
44.3
Red. East
10/15/07
47.1
Red. East
10/15/07
67.3
Red. East
10/15/07
70.8
Red. East
10/15/07
65.9
Red. East
10/15/07
66.3
Red. East
10/15/07
69.5
Red. East
10/15/07
58.1
Red. East
10/15/07
66.1
Red. East
10/15/07
58.6
Red. East
10/15/07
45.3
Red. East
10/15/07
9.9
Red. East
10/16/07
166.9
Red. East
10/16/07
56.1
Red. East
10/16/07
17.2
Red. East
10/16/07
41.5
Red. East
10/16/07
258.7
Red. East
10/16/07
344.4
Red. East
10/16/07
39
Red. East
10/16/07
56.9
Red. East
10/16/07
17.1
Red. East
10/16/07
14.9
Red. East
10/16/07
18
Red. East
10/16/07
20
F-614

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/16/07
40.7
Red. East
10/16/07
19.4
Red. East
10/16/07
63.8
Red. East
10/16/07
25.7
Red. East
10/16/07
33.7
Red. East
10/1 7/07
65.5
Red. East
10/1 7/07
9.3
Red. East
10/18/07
128.7
Red. East
10/18/07
101
Red. East
10/18/07
146.3
Red. East
10/18/07
95.3
Red. East
10/18/07
60.5
Red. East
10/18/07
93.2
Red. East
10/18/07
93.7
Red. East
10/18/07
131.1
Red. East
10/18/07
136.3
Red. East
10/18/07
154.4
Red. East
10/18/07
150.8
Red. East
10/18/07
168.4
Red. East
10/18/07
145.7
Red. East
10/18/07
162.5
Red. East
10/19/07
128.6
Red. East
10/19/07
91.9
Red. East
10/19/07
88.1
Red. East
10/19/07
227.5
Red. East
10/19/07
228
Red. East
10/19/07
240.6
Red. East
10/19/07
203.7
Red. East
10/19/07
294.3
Red. East
10/19/07
163.7
Red. East
10/19/07
62.4
Red. East
10/23/07
61.1
Red. East
10/23/07
195
Red. East
10/23/07
278.9
Red. East
10/23/07
303.8
Red. East
10/23/07
308.3
Red. East
10/23/07
121
Red. East
10/23/07
134.4
Red. East
10/23/07
489.1
Red. East
10/23/07
371.3
Red. East
10/23/07
319.7
Red. East
10/23/07
412.3
Red. East
10/23/07
383.3
Red. East
10/23/07
178
Red. East
10/23/07
146
F-615

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/23/07
134.1
Red. East
10/23/07
240.6
Red. East
10/23/07
266.8
Red. East
10/23/07
244
Red. East
10/23/07
264.2
Red. East
10/23/07
85.8
Red. East
10/23/07
156.6
Red. East
10/23/07
196.9
Red. East
10/23/07
236.4
Red. East
10/23/07
131.2
Red. East
10/23/07
156.4
Red. East
10/23/07
190.6
Red. East
10/23/07
155.3
Red. East
10/23/07
126.2
Red. East
10/23/07
78.6
Red. East
10/24/07
172.8
Red. East
10/24/07
189.4
Red. East
10/24/07
205.8
Red. East
10/24/07
136.3
Red. East
10/24/07
87.6
Red. East
10/24/07
77
Red. East
10/24/07
35
Red. East
10/24/07
96.9
Red. East
10/24/07
107.4
Red. East
10/24/07
106.7
Red. East
10/24/07
86.6
Red. East
10/24/07
103.7
Red. East
10/25/07
111.2
Red. East
10/25/07
138.1
Red. East
10/25/07
165.5
Red. East
10/25/07
94.4
Red. East
10/25/07
157.4
Red. East
10/25/07
201.1
Red. East
10/25/07
154.7
Red. East
10/25/07
192.7
Red. East
10/25/07
169
Red. East
10/25/07
176.8
Red. East
10/25/07
212.8
Red. East
10/25/07
231.5
Red. East
10/25/07
368.6
Red. East
10/25/07
243.7
Red. East
10/25/07
119.4
Red. East
10/25/07
57.6
Red. East
10/25/07
69.4
Red. East
10/25/07
125.2
F-616

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
10/25/07
165.8
Red. East
10/29/07
14
Red. East
10/29/07
153.9
Red. East
10/29/07
144.6
Red. East
10/29/07
129.8
Red. East
10/29/07
156.5
Red. East
10/29/07
63.8
Red. East
10/29/07
50.5
Red. East
10/29/07
86.2
Red. East
10/29/07
326.2
Red. East
10/29/07
303.3
Red. East
10/29/07
184.6
Red. East
10/29/07
86.9
Red. East
10/29/07
204.7
Red. East
11/09/07
211.6
Red. East
11/09/07
181
Red. East
11/09/07
213
Red. East
11/09/07
206.3
Red. East
11/09/07
183
Red. East
11/09/07
168.3
Red. East
11/09/07
243.1
Red. East
11/09/07
113
Red. East
11/09/07
116.1
Red. East
11/09/07
8.8
Red. East
11/09/07
8.2
Red. East
11/09/07
8.6
Red. East
11/09/07
7.7
Red. East
11/09/07
8.5
Red. East
11/12/07
163.8
Red. East
11/12/07
221.3
Red. East
11/12/07
288.4
Red. East
11/12/07
286.2
Red. East
11/12/07
239.8
Red. East
11/12/07
249.8
Red. East
11/12/07
257.8
Red. East
11/12/07
184.5
Red. East
11/12/07
274.8
Red. East
11/12/07
378.6
Red. East
11/12/07
200.3
Red. East
11/12/07
153.2
Red. East
11/12/07
234.1
Red. East
11/12/07
212.8
Red. East
11/12/07
167.5
Red. East
11/12/07
143.3
Red. East
11/12/07
211.4
F-617

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/12/07
115.5
Red. East
11/12/07
161.4
Red. East
11/12/07
212.1
Red. East
11/12/07
19.7
Red. East
11/15/07
8.5
Red. East
11/15/07
183
Red. East
11/15/07
76.6
Red. East
11/15/07
80
Red. East
11/15/07
86.6
Red. East
11/15/07
95.6
Red. East
11/15/07
91.9
Red. East
11/15/07
113.7
Red. East
11/15/07
228.6
Red. East
11/15/07
261.4
Red. East
11/15/07
221.9
Red. East
11/15/07
247.8
Red. East
11/15/07
254.5
Red. East
11/15/07
269
Red. East
11/15/07
301.7
Red. East
11/15/07
269.9
Red. East
11/15/07
177.6
Red. East
11/15/07
184
Red. East
11/15/07
274.7
Red. East
11/15/07
238.4
Red. East
11/15/07
181.3
Red. East
11/15/07
219.2
Red. East
11/16/07
13.8
Red. East
11/16/07
266.3
Red. East
11/16/07
128.8
Red. East
11/16/07
140.5
Red. East
11/16/07
205
Red. East
11/16/07
227.8
Red. East
11/16/07
240
Red. East
11/16/07
257.4
Red. East
11/16/07
226
Red. East
11/16/07
215
Red. East
11/16/07
188.8
Red. East
11/16/07
78.5
Red. East
11/16/07
13.9
Red. East
11/19/07
187.2
Red. East
11/19/07
206.8
Red. East
11/19/07
183
Red. East
11/19/07
252.9
Red. East
11/19/07
206.3
Red. East
11/19/07
185.7
F-618

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/19/07
283.7
Red. East
11/19/07
165.2
Red. East
11/19/07
206.2
Red. East
11/19/07
254.5
Red. East
11/19/07
133.8
Red. East
11/19/07
157
Red. East
11/19/07
200.3
Red. East
11/19/07
234
Red. East
11/19/07
255.2
Red. East
11/19/07
254
Red. East
11/19/07
275.2
Red. East
11/19/07
256.9
Red. East
11/19/07
142.2
Red. East
11/19/07
153.7
Red. East
11/19/07
156.2
Red. East
11/19/07
145.1
Red. East
11/19/07
13.8
Red. East
11/20/07
82.2
Red. East
11/20/07
142.7
Red. East
11/20/07
191.8
Red. East
11/20/07
189.7
Red. East
11/20/07
237
Red. East
11/20/07
128.4
Red. East
11/20/07
105.6
Red. East
11/20/07
251
Red. East
11/20/07
178.8
Red. East
11/20/07
239.7
Red. East
11/20/07
262.6
Red. East
11/20/07
99
Red. East
11/20/07
10.6
Red. East
11/20/07
11.1
Red. East
11/20/07
10.9
Red. East
11/20/07
10.7
Red. East
11/20/07
8.6
Red. East
11/21/07
129.6
Red. East
11/21/07
222.2
Red. East
11/21/07
213.3
Red. East
11/21/07
174.9
Red. East
11/21/07
142.7
Red. East
11/21/07
176.9
Red. East
11/21/07
237.9
Red. East
11/21/07
268.7
Red. East
11/21/07
143.5
Red. East
11/21/07
177
Red. East
11/21/07
149.1
F-619

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
11/21/07
108.1
Red. East
11/21/07
157.2
Red. East
11/21/07
151.4
Red. East
11/21/07
193.8
Red. East
11/21/07
222.2
Red. East
11/21/07
141.6
Red. East
11/21/07
11.1
Red. East
1 2/03/07
301.2
Red. East
1 2/03/07
215.5
Red. East
1 2/03/07
164.7
Red. East
1 2/03/07
135.6
Red. East
1 2/03/07
133.5
Red. East
1 2/03/07
156.9
Red. East
1 2/03/07
202.1
Red. East
1 2/03/07
178.1
Red. East
1 2/03/07
153.6
Red. East
1 2/03/07
169.4
Red. East
1 2/03/07
216.4
Red. East
1 2/03/07
264
Red. East
1 2/03/07
263.7
Red. East
1 2/03/07
153.4
Red. East
1 2/03/07
226.5
Red. East
1 2/03/07
223.5
Red. East
1 2/03/07
203.8
Red. East
1 2/03/07
233.5
Red. East
1 2/03/07
228.7
Red. East
1 2/03/07
221.4
Red. East
1 2/03/07
240.3
Red. East
1 2/03/07
183.2
Red. East
1 2/03/07
249
Red. East
1 2/03/07
240.3
Red. East
1 2/03/07
216.2
Red. East
1 2/03/07
178.2
Red. East
1 2/03/07
203.4
Red. East
1 2/03/07
238.6
Red. East
1 2/03/07
233.1
Red. East
1 2/03/07
237.8
Red. East
1 2/03/07
272
Red. East
1 2/03/07
318.5
Red. East
1 2/03/07
316.6
Red. East
1 2/03/07
340.4
Red. East
1 2/03/07
297.9
Red. East
1 2/03/07
306.3
Red. East
1 2/03/07
348.6
Red. East
1 2/03/07
302.2
F-620

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/03/07
322.5
Red. East
1 2/03/07
352.6
Red. East
1 2/03/07
327.4
Red. East
1 2/03/07
319
Red. East
1 2/03/07
337.1
Red. East
1 2/03/07
325.8
Red. East
1 2/03/07
312.5
Red. East
1 2/03/07
326.1
Red. East
1 2/03/07
371.7
Red. East
1 2/03/07
331.5
Red. East
1 2/03/07
368
Red. East
1 2/03/07
333.6
Red. East
1 2/03/07
336.2
Red. East
1 2/03/07
317.5
Red. East
1 2/03/07
359.6
Red. East
1 2/03/07
268.2
Red. East
1 2/03/07
283.5
Red. East
1 2/03/07
210.6
Red. East
1 2/03/07
250.6
Red. East
1 2/03/07
266.7
Red. East
1 2/03/07
327.1
Red. East
1 2/03/07
255.1
Red. East
1 2/03/07
211.2
Red. East
1 2/03/07
256.1
Red. East
1 2/03/07
152.9
Red. East
1 2/03/07
122.3
Red. East
1 2/03/07
125
Red. East
1 2/03/07
105.6
Red. East
1 2/03/07
107.4
Red. East
1 2/03/07
117
Red. East
1 2/03/07
133.9
Red. East
1 2/03/07
162.7
Red. East
1 2/03/07
157.6
Red. East
1 2/03/07
228.6
Red. East
1 2/03/07
202.6
Red. East
1 2/03/07
186.2
Red. East
1 2/03/07
169.6
Red. East
1 2/03/07
209.1
Red. East
1 2/03/07
254.2
Red. East
1 2/03/07
283.1
Red. East
1 2/03/07
159.3
Red. East
1 2/03/07
188.3
Red. East
1 2/04/07
94.2
Red. East
1 2/04/07
85.5
Red. East
1 2/04/07
121.1
F-621

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/04/07
109.9
Red. East
1 2/04/07
116.5
Red. East
1 2/04/07
123.8
Red. East
1 2/04/07
91
Red. East
1 2/04/07
141.6
Red. East
1 2/04/07
80.1
Red. East
1 2/04/07
157
Red. East
1 2/04/07
140.5
Red. East
1 2/04/07
113.1
Red. East
1 2/04/07
163.6
Red. East
1 2/04/07
84.2
Red. East
1 2/04/07
139.3
Red. East
1 2/04/07
107.6
Red. East
1 2/04/07
121.4
Red. East
1 2/04/07
138
Red. East
1 2/04/07
106.2
Red. East
1 2/04/07
156.1
Red. East
1 2/04/07
86.7
Red. East
1 2/04/07
126.6
Red. East
1 2/04/07
79
Red. East
1 2/04/07
141.1
Red. East
1 2/04/07
96.6
Red. East
1 2/04/07
114.9
Red. East
1 2/04/07
116.1
Red. East
1 2/04/07
113.4
Red. East
1 2/04/07
113.3
Red. East
1 2/04/07
123.4
Red. East
1 2/04/07
139.3
Red. East
1 2/04/07
110.7
Red. East
1 2/04/07
157
Red. East
1 2/04/07
115.2
Red. East
1 2/04/07
142.1
Red. East
1 2/04/07
110.8
Red. East
1 2/04/07
122.2
Red. East
1 2/04/07
109.7
Red. East
1 2/04/07
116.5
Red. East
1 2/04/07
118.6
Red. East
1 2/04/07
139
Red. East
1 2/04/07
148.4
Red. East
1 2/04/07
111.7
Red. East
1 2/04/07
156.8
Red. East
1 2/04/07
114.3
Red. East
1 2/04/07
120.6
Red. East
1 2/04/07
82.1
Red. East
1 2/04/07
129.8
F-622

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/04/07
403.5
Red. East
1 2/04/07
112.8
Red. East
1 2/04/07
105.7
Red. East
1 2/04/07
241.4
Red. East
1 2/04/07
239.4
Red. East
1 2/04/07
159.7
Red. East
1 2/04/07
92.3
Red. East
1 2/04/07
199.2
Red. East
1 2/04/07
146.9
Red. East
1 2/04/07
231
Red. East
1 2/04/07
86.7
Red. East
1 2/04/07
97.5
Red. East
1 2/04/07
313.7
Red. East
1 2/04/07
97
Red. East
1 2/04/07
97.7
Red. East
1 2/04/07
171.7
Red. East
1 2/04/07
170.8
Red. East
1 2/04/07
136.1
Red. East
1 2/04/07
134.5
Red. East
1 2/05/07
161
Red. East
1 2/05/07
77.5
Red. East
1 2/05/07
143
Red. East
1 2/05/07
79.9
Red. East
1 2/05/07
114.7
Red. East
1 2/05/07
98.4
Red. East
1 2/05/07
132.6
Red. East
1 2/05/07
85.7
Red. East
1 2/05/07
126.2
Red. East
1 2/05/07
118.1
Red. East
1 2/05/07
114.6
Red. East
1 2/05/07
112.9
Red. East
1 2/05/07
121.5
Red. East
1 2/05/07
130.6
Red. East
1 2/05/07
102.9
Red. East
1 2/05/07
101.8
Red. East
1 2/05/07
122.4
Red. East
1 2/05/07
105.4
Red. East
1 2/05/07
100.6
Red. East
1 2/05/07
64.6
Red. East
1 2/05/07
10.3
Red. East
1 2/10/07
117.6
Red. East
1 2/10/07
121.7
Red. East
1 2/10/07
104.8
Red. East
1 2/10/07
103.9
Red. East
1 2/10/07
108.4
F-623

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/10/07
161.7
Red. East
1 2/10/07
182.5
Red. East
1 2/10/07
188.9
Red. East
1 2/10/07
127.7
Red. East
1 2/10/07
230.9
Red. East
1 2/10/07
106.5
Red. East
1 2/10/07
13.8
Red. East
1 2/10/07
11.2
Red. East
1 2/10/07
11
Red. East
1 2/14/07
124.2
Red. East
1 2/14/07
123.7
Red. East
1 2/14/07
128.3
Red. East
1 2/14/07
166.6
Red. East
1 2/14/07
158.3
Red. East
1 2/14/07
150.2
Red. East
1 2/14/07
88.2
Red. East
1 2/14/07
128.6
Red. East
1 2/14/07
126.8
Red. East
1 2/14/07
187.3
Red. East
1 2/14/07
99.9
Red. East
1 2/14/07
93.8
Red. East
1 2/14/07
107
Red. East
1 2/14/07
166.1
Red. East
1 2/14/07
181.6
Red. East
1 2/14/07
158.7
Red. East
1 2/14/07
171.4
Red. East
1 2/14/07
283.1
Red. East
1 2/14/07
220
Red. East
1 2/14/07
166.4
Red. East
1 2/14/07
85.8
Red. East
1 2/14/07
10.7
Red. East
1 2/1 7/07
139.8
Red. East
1 2/1 7/07
148.7
Red. East
1 2/1 7/07
215.9
Red. East
1 2/1 7/07
156.7
Red. East
1 2/1 7/07
11.1
Red. East
1 2/18/07
503.3
Red. East
1 2/18/07
457.6
Red. East
1 2/18/07
355.9
Red. East
1 2/18/07
209.8
Red. East
1 2/18/07
128.9
Red. East
1 2/18/07
122.3
Red. East
1 2/18/07
190
Red. East
1 2/18/07
116.4
Red. East
1 2/18/07
170.6
F-624

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/18/07
98.5
Red. East
1 2/18/07
104.9
Red. East
1 2/18/07
146.6
Red. East
1 2/18/07
11
Red. East
1 2/19/07
181.6
Red. East
1 2/19/07
136.9
Red. East
1 2/19/07
121.1
Red. East
1 2/19/07
183
Red. East
1 2/19/07
183
Red. East
1 2/19/07
448.5
Red. East
1 2/19/07
381.1
Red. East
1 2/19/07
303.7
Red. East
1 2/19/07
105.3
Red. East
1 2/19/07
149.9
Red. East
1 2/19/07
130.6
Red. East
1 2/19/07
134.8
Red. East
1 2/19/07
208.9
Red. East
1 2/19/07
234.4
Red. East
1 2/19/07
257.4
Red. East
1 2/19/07
289.2
Red. East
1 2/19/07
350.8
Red. East
1 2/19/07
258
Red. East
1 2/19/07
194.3
Red. East
1 2/19/07
243
Red. East
1 2/19/07
133.6
Red. East
1 2/19/07
75.9
Red. East
1 2/19/07
136.3
Red. East
1 2/19/07
179.8
Red. East
1 2/19/07
169.4
Red. East
1 2/19/07
214
Red. East
1 2/20/07
60.8
Red. East
1 2/20/07
65.3
Red. East
1 2/20/07
134.3
Red. East
1 2/20/07
189.4
Red. East
1 2/20/07
243.5
Red. East
1 2/20/07
237.7
Red. East
1 2/20/07
282.4
Red. East
1 2/20/07
179.4
Red. East
1 2/20/07
65.4
Red. East
1 2/20/07
92.6
Red. East
1 2/20/07
163
Red. East
1 2/20/07
169.7
Red. East
1 2/20/07
156
Red. East
1 2/20/07
221
Red. East
1 2/20/07
272.2
F-625

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/20/07
267.6
Red. East
1 2/20/07
292.2
Red. East
1 2/20/07
347.5
Red. East
1 2/20/07
185.9
Red. East
1 2/20/07
84.3
Red. East
1 2/20/07
142.2
Red. East
1 2/20/07
157.8
Red. East
1 2/20/07
212.7
Red. East
1 2/20/07
330.1
Red. East
1 2/20/07
364.8
Red. East
1 2/20/07
354.5
Red. East
1 2/20/07
376.1
Red. East
1 2/20/07
29.3
Red. East
12/23/07
14.8
Red. East
12/23/07
209.7
Red. East
12/23/07
185.8
Red. East
12/23/07
169.5
Red. East
12/23/07
163.7
Red. East
12/23/07
157.5
Red. East
12/23/07
147.4
Red. East
12/23/07
163.8
Red. East
12/23/07
247.8
Red. East
12/23/07
5.6
Red. East
1 2/24/07
190.5
Red. East
1 2/24/07
219.8
Red. East
1 2/24/07
263
Red. East
1 2/24/07
345.4
Red. East
1 2/24/07
184.7
Red. East
1 2/24/07
169.3
Red. East
1 2/24/07
8.1
Red. East
1 2/26/07
122.1
Red. East
1 2/26/07
122.2
Red. East
1 2/26/07
138.8
Red. East
1 2/26/07
97.7
Red. East
1 2/26/07
189.4
Red. East
1 2/26/07
179.3
Red. East
1 2/26/07
156.2
Red. East
1 2/26/07
346
Red. East
1 2/28/07
40.3
Red. East
1 2/28/07
408.1
Red. East
1 2/28/07
215
Red. East
1 2/28/07
117.3
Red. East
1 2/28/07
120.4
Red. East
1 2/28/07
117.2
Red. East
1 2/28/07
132.5
F-626

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
1 2/28/07
237.3
Red. East
1 2/28/07
131.3
Red. East
1 2/28/07
130.4
Red. East
1 2/28/07
195.4
Red. East
1 2/28/07
187.5
Red. East
1 2/28/07
12.8
Red. East
12/31/07
69.1
Red. East
12/31/07
76.4
Red. East
12/31/07
110.4
Red. East
12/31/07
160.2
Red. East
12/31/07
567.6
Red. East
12/31/07
104.4
Red. East
12/31/07
97.9
Red. East
01/03/08
89.6
Red. East
01/03/08
97.8
Red. East
01/03/08
122.7
Red. East
01/03/08
99.2
Red. East
01/03/08
118.7
Red. East
01/03/08
76.3
Red. East
01/03/08
108.6
Red. East
01/03/08
65.9
Red. East
01/03/08
94
Red. East
01/03/08
127.3
Red. East
01/05/08
145.6
Red. East
01/05/08
122.7
Red. East
01/05/08
118
Red. East
01/05/08
120.3
Red. East
01/05/08
131
Red. East
01/05/08
84.4
Red. East
01/05/08
143.2
Red. East
01/05/08
8.9
Red. East
01/08/08
188.8
Red. East
01/08/08
177.7
Red. East
01/08/08
541.7
Red. East
01/08/08
48.9
Red. East
01/08/08
96.9
Red. East
01/08/08
223.5
Red. East
01/08/08
280.7
Red. East
01/08/08
172.1
Red. East
01/08/08
151.9
Red. East
01/08/08
134.5
Red. East
01/08/08
131.5
Red. East
01/08/08
154.5
Red. East
01/08/08
158.2
Red. East
01/08/08
198.3
F-627

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/08/08
286.7
Red. East
01/08/08
149.3
Red. East
01/08/08
128.2
Red. East
01/08/08
251.9
Red. East
01/08/08
230.3
Red. East
01/09/08
634.5
Red. East
01/09/08
84.6
Red. East
01/09/08
177.6
Red. East
01/09/08
246
Red. East
01/09/08
180.1
Red. East
01/09/08
141.4
Red. East
01/09/08
137.2
Red. East
01/09/08
153.4
Red. East
01/09/08
189.8
Red. East
01/09/08
483.2
Red. East
01/09/08
542.8
Red. East
01/09/08
486.1
Red. East
01/09/08
400.6
Red. East
01/09/08
11
Red. East
01/09/08
5.2
Red. East
01/09/08
946.7
Red. East
01/09/08
1.6
Red. East
01/10/08
127.7
Red. East
01/10/08
166
Red. East
01/10/08
425.8
Red. East
01/10/08
305.1
Red. East
01/10/08
188.6
Red. East
01/10/08
56.2
Red. East
01/10/08
230.6
Red. East
01/10/08
312.2
Red. East
01/10/08
349.2
Red. East
01/10/08
302.1
Red. East
01/10/08
340.8
Red. East
01/10/08
357.3
Red. East
01/10/08
216.6
Red. East
01/10/08
67.8
Red. East
01/10/08
59.7
Red. East
01/10/08
94.5
Red. East
01/10/08
147.5
Red. East
01/10/08
294.7
Red. East
01/10/08
285.6
Red. East
01/10/08
208.8
Red. East
01/10/08
227.6
Red. East
01/10/08
227
Red. East
01/10/08
187
F-628

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/10/08
11.9
Red. East
01/10/08
12.2
Red. East
01/11/08
253.3
Red. East
01/11/08
206.9
Red. East
01/11/08
371.3
Red. East
01/11/08
546.2
Red. East
01/11/08
294.1
Red. East
01/11/08
11.6
Red. East
01/17/08
174
Red. East
01/17/08
231.7
Red. East
01/17/08
204.1
Red. East
01/17/08
206.6
Red. East
01/17/08
166.1
Red. East
01/17/08
259.2
Red. East
01/17/08
188.4
Red. East
01/17/08
235.3
Red. East
01/17/08
210.8
Red. East
01/17/08
202.4
Red. East
01/17/08
213.2
Red. East
01/17/08
286
Red. East
01/17/08
178.7
Red. East
01/17/08
115.6
Red. East
01/17/08
219.9
Red. East
01/17/08
118.3
Red. East
01/17/08
396.7
Red. East
01/17/08
394.7
Red. East
01/18/08
133.7
Red. East
01/18/08
199.3
Red. East
01/18/08
294.8
Red. East
01/18/08
315.5
Red. East
01/18/08
234.4
Red. East
01/18/08
185.8
Red. East
01/18/08
210.9
Red. East
01/18/08
186.5
Red. East
01/18/08
211.2
Red. East
01/18/08
106.4
Red. East
01/22/08
241.3
Red. East
01/22/08
178.7
Red. East
01/22/08
133.6
Red. East
01/22/08
121.5
Red. East
01/22/08
139.3
Red. East
01/22/08
179.3
Red. East
01/22/08
258.4
Red. East
01/22/08
356.5
Red. East
01/22/08
441.5
F-629

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/22/08
328.1
Red. East
01/23/08
173.6
Red. East
01/23/08
173.8
Red. East
01/23/08
136
Red. East
01/23/08
202.2
Red. East
01/23/08
164.8
Red. East
01/23/08
118.8
Red. East
01/23/08
232.9
Red. East
01/23/08
136.4
Red. East
01/23/08
259.6
Red. East
01/23/08
129.1
Red. East
01/23/08
149.4
Red. East
01/23/08
149.7
Red. East
01/23/08
67.8
Red. East
01/23/08
170.7
Red. East
01/23/08
100.2
Red. East
01/23/08
95.2
Red. East
01/23/08
58.8
Red. East
01/29/08
331.1
Red. East
01/29/08
349.8
Red. East
01/29/08
367.7
Red. East
01/29/08
367.5
Red. East
01/29/08
447.4
Red. East
01/29/08
402.3
Red. East
01/29/08
425.3
Red. East
01/29/08
438
Red. East
01/29/08
419.7
Red. East
01/29/08
444.7
Red. East
01/29/08
904.1
Red. East
01/29/08
794.6
Red. East
01/29/08
431.8
Red. East
01/31/08
504.3
Red. East
01/31/08
467.3
Red. East
01/31/08
433.2
Red. East
01/31/08
452.4
Red. East
01/31/08
399.5
Red. East
01/31/08
385.4
Red. East
01/31/08
317.6
Red. East
01/31/08
298.6
Red. East
01/31/08
295.7
Red. East
01/31/08
329.8
Red. East
01/31/08
337.1
Red. East
01/31/08
496.9
Red. East
01/31/08
385.8
Red. East
01/31/08
696.1
F-630

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
01/31/08
539.2
Red. East
02/01/08
77.6
Red. East
02/01/08
101.5
Red. East
02/01/08
101.9
Red. East
02/01/08
372.2
Red. East
02/01/08
439.7
Red. East
02/01/08
493.1
Red. East
02/01/08
688.5
Red. East
02/01/08
585.7
Red. East
02/05/08
173.8
Red. East
02/05/08
103.6
Red. East
02/05/08
46.2
Red. East
02/05/08
63.6
Red. East
02/05/08
90.3
Red. East
02/07/08
86.8
Red. East
02/07/08
82.5
Red. East
02/07/08
76.9
Red. East
02/07/08
75.5
Red. East
02/07/08
597.1
Red. East
02/07/08
107.7
Red. East
02/07/08
501.7
Red. East
02/11/08
653.1
Red. East
02/1 2/08
65.9
Red. East
02/1 2/08
86.8
Red. East
02/1 2/08
72.7
Red. East
02/1 2/08
71.3
Red. East
02/1 2/08
73.3
Red. East
02/1 2/08
73.5
Red. East
02/1 2/08
103.7
Red. East
02/1 2/08
116
Red. East
02/1 2/08
62.1
Red. East
02/1 2/08
15.4
Red. East
02/1 2/08
58.5
Red. East
02/1 2/08
86.2
Red. East
02/1 2/08
75.4
Red. East
02/1 2/08
99.4
Red. East
02/1 2/08
11.1
Red. East
02/1 3/08
113.5
Red. East
02/1 3/08
130.6
Red. East
02/1 3/08
83.3
Red. East
02/1 3/08
81.3
Red. East
02/1 3/08
90.5
Red. East
02/1 3/08
131.1
Red. East
02/20/08
182
Red. East
02/20/08
78
F-631

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
02/20/08
84.3
Red. East
02/20/08
119.8
Red. East
03/1 7/08
63.8
Red. East
03/1 7/08
55
Red. East
03/1 7/08
60.1
Red. East
03/1 7/08
66.5
Red. East
03/1 7/08
46.9
Red. East
03/1 7/08
69.2
Red. East
03/18/08
106.6
Red. East
03/18/08
60.5
Red. East
03/18/08
50.8
Red. East
03/18/08
45.9
Red. East
03/18/08
45.3
Red. East
03/18/08
45.3
Red. East
03/18/08
109.4
Red. East
03/18/08
48.9
Red. East
03/18/08
22.9
Red. East
03/20/08
49
Red. East
03/20/08
51.5
Red. East
03/20/08
46.5
Red. East
03/20/08
55.1
Red. East
04/01/08
13.6
Red. East
04/01/08
12.7
Red. East
04/01/08
19.2
Red. East
04/01/08
64.1
Red. East
04/02/08
70.6
Red. East
04/02/08
71.1
Red. East
04/02/08
67.3
Red. East
04/02/08
66.7
Red. East
04/02/08
63
Red. East
04/02/08
61.5
Red. East
04/02/08
62.2
Red. East
04/02/08
62.8
Red. East
04/02/08
62.8
Red. East
04/02/08
59.9
Red. East
04/02/08
61.5
Red. East
04/02/08
79.5
Red. East
04/02/08
92.5
Red. East
04/02/08
76.2
Red. East
04/02/08
95.5
Red. East
04/02/08
52.3
Red. East
04/02/08
74.4
Red. East
04/02/08
49.5
Red. East
04/02/08
25.8
Red. East
04/02/08
13.6
F-632

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
04/04/08
158.6
Red. East
04/04/08
89.4
Red. East
04/04/08
88.2
Red. East
04/04/08
145.2
Red. East
04/04/08
113.4
Red. East
04/04/08
134.2
Red. East
04/04/08
70.8
Red. East
04/04/08
75.9
Red. East
04/04/08
65.4
Red. East
04/04/08
43.4
Red. East
04/04/08
49
Red. East
04/04/08
87.4
Red. East
04/1 7/08
41.2
Red. East
04/1 7/08
54.2
Red. East
04/1 7/08
43
Red. East
04/1 7/08
26.8
Red. East
04/1 7/08
59.7
Red. East
04/1 7/08
41
Red. East
04/1 7/08
29.5
Red. East
04/1 7/08
25.8
Red. East
04/1 7/08
27.9
Red. East
04/1 7/08
188.3
Red. East
04/1 7/08
473.6
Red. East
04/22/08
54.4
Red. East
04/22/08
60.1
Red. East
04/22/08
67
Red. East
04/22/08
66.5
Red. East
04/22/08
54.5
Red. East
04/22/08
59.8
Red. East
04/22/08
90.3
Red. East
04/22/08
71.2
Red. East
04/22/08
68.7
Red. East
04/22/08
44.1
Red. East
04/23/08
248.4
Red. East
04/23/08
83.5
Red. East
04/23/08
125
Red. East
04/23/08
108.9
Red. East
04/23/08
172.9
Red. East
04/23/08
162.8
Red. East
04/23/08
175.9
Red. East
04/23/08
127.3
Red. East
04/23/08
198.2
Red. East
04/23/08
440
Red. East
04/23/08
686.5
Red. East
04/23/08
118.7
F-633

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. East
04/23/08
183.2
Red. East
04/23/08
137.9
Red. East
04/23/08
164.8
Red. East
04/23/08
140.7
Red. East
04/23/08
210.4
Red. East
04/24/08
58
Red. East
04/24/08
68.5
Red. East
04/24/08
79.1
Red. East
04/24/08
86.7
Red. East
04/24/08
78.1
Red. East
04/24/08
35.2
Red. East
04/24/08
94.1
Red. West
11/05/06
249.3
Red. West
11/05/06
245.5
Red. West
11/05/06
241.6
Red. West
11/05/06
239.1
Red. West
11/05/06
238
Red. West
11/05/06
239.5
Red. West
11/05/06
237.3
Red. West
11/05/06
232.5
Red. West
11/05/06
236.2
Red. West
11/05/06
237.4
Red. West
11/05/06
235.8
Red. West
11/05/06
237
Red. West
11/05/06
241.3
Red. West
11/05/06
243.7
Red. West
11/05/06
248.3
Red. West
11/05/06
247.3
Red. West
11/05/06
251.4
Red. West
11/05/06
250.4
Red. West
11/05/06
253.8
Red. West
11/05/06
300.7
Red. West
11/05/06
186.3
Red. West
11/06/06
202.1
Red. West
11/06/06
192.7
Red. West
11/06/06
218.7
Red. West
11/06/06
217.3
Red. West
11/06/06
218.5
Red. West
11/06/06
224.4
Red. West
11/06/06
231
Red. West
11/06/06
247.6
Red. West
11/06/06
254.4
Red. West
11/06/06
260.2
Red. West
11/06/06
279.6
Red. West
11/06/06
286.6
F-634

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
11/06/06
125.8
Red. West
11/06/06
302.8
Red. West
11/06/06
328.9
Red. West
11/06/06
336.4
Red. West
11/06/06
370
Red. West
11/06/06
382.1
Red. West
11/06/06
399.6
Red. West
11/06/06
418.6
Red. West
11/06/06
452.5
Red. West
11/06/06
492.9
Red. West
11/06/06
534.6
Red. West
11/06/06
559.5
Red. West
11/06/06
543.6
Red. West
11/06/06
562.4
Red. West
11/06/06
534.4
Red. West
11/06/06
614.1
Red. West
11/06/06
595.3
Red. West
11/06/06
560.1
Red. West
11/06/06
573.7
Red. West
11/06/06
550
Red. West
11/06/06
475.7
Red. West
11/06/06
465.1
Red. West
11/06/06
332.9
Red. West
11/06/06
16
Red. West
11/06/06
15.5
Red. West
11/06/06
15.5
Red. West
11/06/06
15.5
Red. West
11/06/06
15.7
Red. West
11/06/06
283.6
Red. West
11/07/06
152.2
Red. West
11/07/06
147.4
Red. West
11/07/06
136.2
Red. West
11/07/06
131.5
Red. West
11/07/06
125.8
Red. West
11/07/06
120.6
Red. West
11/07/06
119.4
Red. West
11/07/06
116.5
Red. West
11/07/06
119.4
Red. West
11/07/06
118.8
Red. West
11/07/06
121.9
Red. West
11/07/06
122.7
Red. West
11/07/06
118
Red. West
11/07/06
115.9
Red. West
11/07/06
135.4
Red. West
11/07/06
110
F-635

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
11/07/06
290.1
Red. West
11/07/06
286.8
Red. West
11/07/06
290
Red. West
11/07/06
285
Red. West
11/07/06
283.5
Red. West
11/07/06
283.2
Red. West
11/07/06
284.1
Red. West
11/07/06
277.6
Red. West
11/07/06
271.2
Red. West
11/07/06
256.9
Red. West
11/07/06
232.4
Red. West
11/07/06
227.5
Red. West
11/07/06
224.6
Red. West
11/07/06
239
Red. West
11/07/06
246.4
Red. West
11/07/06
256.5
Red. West
11/07/06
251.2
Red. West
11/07/06
237.3
Red. West
11/07/06
230.2
Red. West
11/07/06
194
Red. West
11/07/06
172.3
Red. West
11/07/06
159.1
Red. West
11/07/06
152.9
Red. West
11/07/06
181.3
Red. West
11/07/06
167
Red. West
11/07/06
164.3
Red. West
11/07/06
156.9
Red. West
11/07/06
233.4
Red. West
11/07/06
186.4
Red. West
11/07/06
162.7
Red. West
11/07/06
164.7
Red. West
11/07/06
166.5
Red. West
11/07/06
165.3
Red. West
11/07/06
172.8
Red. West
11/07/06
174.9
Red. West
11/07/06
176
Red. West
11/07/06
180.2
Red. West
11/08/06
84.4
Red. West
11/08/06
80
Red. West
11/08/06
164.2
Red. West
11/08/06
81.1
Red. West
11/08/06
50.5
Red. West
11/08/06
90.9
Red. West
11/08/06
95.6
Red. West
11/08/06
101.8
F-636

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
11/08/06
104.9
Red. West
11/08/06
126.3
Red. West
11/08/06
173.5
Red. West
11/10/06
215.1
Red. West
11/10/06
209.6
Red. West
11/10/06
185.1
Red. West
11/10/06
145.2
Red. West
11/10/06
159.7
Red. West
11/10/06
133.2
Red. West
11/10/06
124.5
Red. West
11/10/06
148.1
Red. West
11/10/06
246
Red. West
11/10/06
242.7
Red. West
11/10/06
246.5
Red. West
11/10/06
207.3
Red. West
11/10/06
57.7
Red. West
11/10/06
58.6
Red. West
11/10/06
58.7
Red. West
11/10/06
58.7
Red. West
11/10/06
57.7
Red. West
11/10/06
59.4
Red. West
11/10/06
59.7
Red. West
11/10/06
63.8
Red. West
11/10/06
58.4
Red. West
11/10/06
165
Red. West
11/11/06
123.5
Red. West
11/11/06
146.9
Red. West
11/11/06
181.3
Red. West
11/11/06
194.7
Red. West
11/11/06
190.7
Red. West
11/11/06
200.3
Red. West
11/12/06
111.8
Red. West
11/12/06
108.4
Red. West
11/12/06
100
Red. West
11/12/06
92
Red. West
11/12/06
78.5
Red. West
11/12/06
44.2
Red. West
11/12/06
21.5
Red. West
11/12/06
26.2
Red. West
11/13/06
191.8
Red. West
11/13/06
202.3
Red. West
11/13/06
194.3
Red. West
11/13/06
179.7
Red. West
11/13/06
48.4
Red. West
11/13/06
29.3
F-637

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
11/1 3/06
29.6
Red. West
11/1 3/06
32.9
Red. West
11/1 3/06
72.1
Red. West
11/14/06
116.8
Red. West
11/14/06
124.6
Red. West
11/14/06
132.8
Red. West
11/14/06
145.3
Red. West
11/14/06
157.3
Red. West
11/14/06
164.3
Red. West
11/14/06
167.8
Red. West
11/14/06
167.8
Red. West
11/14/06
161.5
Red. West
11/14/06
145.8
Red. West
11/14/06
82.8
Red. West
11/14/06
36.9
Red. West
11/14/06
48.4
Red. West
11/14/06
3.4
Red. West
11/16/06
147.8
Red. West
11/16/06
138.8
Red. West
11/16/06
142
Red. West
11/16/06
145.7
Red. West
11/16/06
150.5
Red. West
11/16/06
131.1
Red. West
11/16/06
126.4
Red. West
11/16/06
130.7
Red. West
11/16/06
153
Red. West
11/20/06
189.8
Red. West
11/20/06
175.6
Red. West
11/20/06
198
Red. West
11/20/06
218.4
Red. West
11/20/06
201.4
Red. West
11/20/06
160.5
Red. West
11/20/06
128.1
Red. West
11/20/06
109.1
Red. West
11/20/06
112.7
Red. West
11/20/06
113.2
Red. West
11/20/06
106.9
Red. West
11/20/06
3.6
Red. West
11/20/06
61.2
Red. West
11/20/06
62.6
Red. West
11/20/06
69.1
Red. West
11/20/06
194.2
Red. West
11/21/06
159.2
Red. West
11/21/06
167.3
Red. West
11/21/06
174.4
F-638

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
11/21/06
177.9
Red. West
11/21/06
176.9
Red. West
11/21/06
163.8
Red. West
11/21/06
169.1
Red. West
11/21/06
186.3
Red. West
11/21/06
203.8
Red. West
11/21/06
210
Red. West
11/21/06
213.6
Red. West
11/21/06
205.6
Red. West
11/21/06
202.4
Red. West
11/21/06
216.7
Red. West
11/21/06
228.1
Red. West
11/21/06
228.3
Red. West
11/21/06
223.1
Red. West
11/21/06
197.4
Red. West
11/21/06
126.7
Red. West
11/21/06
121.7
Red. West
11/21/06
124.6
Red. West
11/21/06
139.1
Red. West
11/22/06
158.2
Red. West
11/22/06
166.6
Red. West
11/22/06
170.9
Red. West
11/22/06
177.9
Red. West
11/22/06
183.6
Red. West
11/22/06
184.9
Red. West
11/22/06
185.8
Red. West
11/22/06
182.1
Red. West
11/22/06
171.7
Red. West
11/22/06
122
Red. West
11/22/06
128.8
Red. West
11/22/06
129.1
Red. West
11/22/06
153.6
Red. West
11/24/06
102.7
Red. West
11/24/06
103.1
Red. West
11/24/06
104
Red. West
11/24/06
104.5
Red. West
11/24/06
104.1
Red. West
11/24/06
99.9
Red. West
11/24/06
62.4
Red. West
11/24/06
61.9
Red. West
11/24/06
77.9
Red. West
1 2/05/06
43.1
Red. West
1 2/05/06
43.4
Red. West
1 2/05/06
43.2
Red. West
1 2/05/06
41.2
F-639

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
1 2/05/06
40.7
Red. West
1 2/05/06
40.6
Red. West
1 2/05/06
40.4
Red. West
1 2/05/06
42.9
Red. West
1 2/05/06
46.1
Red. West
1 2/05/06
46.8
Red. West
1 2/05/06
46.9
Red. West
1 2/05/06
46.4
Red. West
1 2/05/06
43.5
Red. West
1 2/05/06
3.3
Red. West
1 2/05/06
37.7
Red. West
1 2/05/06
38.4
Red. West
1 2/05/06
46.3
Red. West
12/11/06
273.7
Red. West
12/11/06
248.3
Red. West
12/11/06
246.6
Red. West
12/11/06
236.7
Red. West
12/11/06
261.4
Red. West
12/11/06
355.7
Red. West
12/11/06
400
Red. West
12/11/06
375.9
Red. West
12/11/06
242.5
Red. West
12/11/06
282.3
Red. West
12/11/06
405.2
Red. West
12/11/06
387.6
Red. West
12/11/06
335.9
Red. West
12/11/06
155.9
Red. West
12/11/06
183.2
Red. West
12/11/06
185.9
Red. West
12/11/06
113.8
Red. West
1 2/1 2/06
292.8
Red. West
1 2/1 2/06
294.1
Red. West
1 2/1 2/06
293
Red. West
1 2/1 2/06
307.9
Red. West
1 2/1 2/06
201.5
Red. West
1 2/1 2/06
146.7
Red. West
1 2/1 2/06
149.6
Red. West
1 2/1 3/06
113.6
Red. West
1 2/1 3/06
120
Red. West
1 2/1 3/06
122.2
Red. West
1 2/1 3/06
112.5
Red. West
1 2/1 3/06
111.5
Red. West
1 2/1 3/06
122.3
Red. West
1 2/1 3/06
148
Red. West
1 2/1 3/06
190.3
F-640

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
1 2/1 3/06
224.7
Red. West
1 2/1 3/06
250.6
Red. West
1 2/1 3/06
222
Red. West
1 2/1 3/06
237.5
Red. West
1 2/1 3/06
282.5
Red. West
1 2/1 3/06
317.8
Red. West
1 2/1 3/06
293
Red. West
1 2/1 3/06
237.4
Red. West
1 2/1 3/06
120.3
Red. West
1 2/1 3/06
122.5
Red. West
1 2/1 3/06
126.6
Red. West
1 2/14/06
257.2
Red. West
1 2/14/06
263.2
Red. West
1 2/14/06
276.4
Red. West
1 2/14/06
299
Red. West
1 2/14/06
389.4
Red. West
1 2/14/06
412
Red. West
1 2/14/06
491.3
Red. West
1 2/15/06
226.9
Red. West
1 2/15/06
213.2
Red. West
1 2/15/06
164.7
Red. West
1 2/15/06
110.7
Red. West
1 2/15/06
120.4
Red. West
1 2/15/06
140.5
Red. West
1 2/15/06
203.1
Red. West
1 2/15/06
230.3
Red. West
1 2/15/06
220.3
Red. West
1 2/15/06
156.4
Red. West
1 2/15/06
131
Red. West
1 2/15/06
142.4
Red. West
1 2/15/06
166.2
Red. West
1 2/15/06
218.6
Red. West
1 2/15/06
251.8
Red. West
1 2/15/06
204.3
Red. West
1 2/15/06
120.9
Red. West
1 2/15/06
133.8
Red. West
1 2/15/06
154
Red. West
1 2/15/06
178.3
Red. West
1 2/15/06
231.7
Red. West
1 2/15/06
364.1
Red. West
1 2/15/06
253.7
Red. West
1 2/15/06
206.8
Red. West
1 2/15/06
210.1
Red. West
1 2/15/06
159.1
Red. West
1 2/15/06
168.1
F-641

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
1 2/15/06
202.9
Red. West
1 2/15/06
242.7
Red. West
1 2/15/06
284.2
Red. West
1 2/16/06
189.2
Red. West
1 2/16/06
191.4
Red. West
1 2/16/06
183.1
Red. West
1 2/16/06
116.9
Red. West
1 2/16/06
104.2
Red. West
1 2/16/06
118.1
Red. West
1 2/16/06
143.5
Red. West
1 2/16/06
327
Red. West
1 2/16/06
362.7
Red. West
1 2/16/06
400.9
Red. West
1 2/16/06
181.5
Red. West
1 2/16/06
59.2
Red. West
1 2/16/06
59.8
Red. West
1 2/16/06
59.7
Red. West
1 2/16/06
5.7
Red. West
12/21/06
215.8
Red. West
12/21/06
249.1
Red. West
12/21/06
317.9
Red. West
12/21/06
281.7
Red. West
12/21/06
15.8
Red. West
12/21/06
10.2
Red. West
12/21/06
9.8
Red. West
12/21/06
10.5
Red. West
12/22/06
121
Red. West
12/22/06
126.6
Red. West
12/22/06
153.3
Red. West
12/22/06
190.8
Red. West
12/22/06
201.4
Red. West
12/22/06
134.7
Red. West
12/22/06
123.1
Red. West
12/22/06
138.7
Red. West
12/22/06
174
Red. West
12/22/06
227.5
Red. West
12/22/06
283.9
Red. West
12/22/06
284.2
Red. West
12/22/06
95.6
Red. West
12/22/06
80.9
Red. West
12/22/06
82.2
Red. West
12/22/06
99.7
Red. West
12/22/06
118.2
Red. West
12/22/06
169
Red. West
12/22/06
140.1
F-642

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
12/22/06
38
Red. West
1 2/26/06
233.1
Red. West
1 2/26/06
246.1
Red. West
1 2/26/06
234.5
Red. West
1 2/26/06
201.8
Red. West
1 2/26/06
144.1
Red. West
1 2/26/06
143.1
Red. West
1 2/26/06
157.1
Red. West
1 2/26/06
177.4
Red. West
1 2/26/06
197.8
Red. West
1 2/26/06
202.9
Red. West
1 2/26/06
208.8
Red. West
1 2/26/06
114.9
Red. West
1 2/26/06
89.1
Red. West
1 2/26/06
86
Red. West
1 2/26/06
99.8
Red. West
1 2/26/06
47.2
Red. West
12/27/06
132.3
Red. West
12/27/06
138.5
Red. West
12/27/06
130.9
Red. West
12/27/06
115.2
Red. West
12/27/06
114.8
Red. West
12/27/06
133.1
Red. West
12/27/06
142.8
Red. West
12/27/06
149.4
Red. West
12/27/06
156.6
Red. West
12/27/06
161.9
Red. West
12/27/06
167.4
Red. West
12/27/06
177.5
Red. West
12/27/06
185.7
Red. West
12/27/06
180.4
Red. West
12/27/06
150.6
Red. West
12/27/06
141.9
Red. West
12/27/06
164.8
Red. West
12/27/06
185.5
Red. West
12/27/06
194.5
Red. West
12/27/06
206.1
Red. West
12/27/06
216.7
Red. West
12/27/06
227.9
Red. West
12/27/06
235.8
Red. West
12/27/06
212.5
Red. West
12/27/06
178.5
Red. West
12/27/06
177.3
Red. West
12/27/06
172.8
Red. West
12/27/06
171.1
F-643

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
12/27/06
188.6
Red. West
12/27/06
195.1
Red. West
12/27/06
120.6
Red. West
12/27/06
116.9
Red. West
12/27/06
113.9
Red. West
12/27/06
14.7
Red. West
01/03/07
160.9
Red. West
01/03/07
160.3
Red. West
01/03/07
170.7
Red. West
01/03/07
171.4
Red. West
01/03/07
176.6
Red. West
01/03/07
180.6
Red. West
01/03/07
194.6
Red. West
01/03/07
209.9
Red. West
01/03/07
218.4
Red. West
01/03/07
220.8
Red. West
01/03/07
212.6
Red. West
01/03/07
159.8
Red. West
01/03/07
59.2
Red. West
01/03/07
50.9
Red. West
01/03/07
51.3
Red. West
01/03/07
63.9
Red. West
01/06/07
188.1
Red. West
01/06/07
193.5
Red. West
01/06/07
210
Red. West
01/06/07
232
Red. West
01/06/07
164.1
Red. West
01/06/07
166.4
Red. West
01/06/07
182.2
Red. West
01/06/07
213.9
Red. West
01/07/07
158.2
Red. West
01/07/07
163.4
Red. West
01/07/07
168.2
Red. West
01/07/07
186.1
Red. West
01/07/07
154.6
Red. West
01/07/07
150.7
Red. West
01/07/07
161.2
Red. West
01/07/07
152.2
Red. West
01/07/07
139.5
Red. West
01/07/07
140.9
Red. West
01/07/07
169.1
Red. West
01/22/07
113.9
Red. West
01/22/07
115
Red. West
01/22/07
100.6
Red. West
01/22/07
110.5
F-644

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
01/22/07
134.7
Red. West
01/22/07
102.8
Red. West
01/22/07
106.9
Red. West
01/22/07
132.3
Red. West
01/22/07
141.9
Red. West
01/22/07
106
Red. West
01/22/07
108.9
Red. West
01/22/07
130.7
Red. West
01/22/07
152.5
Red. West
01/22/07
109.8
Red. West
01/22/07
122.3
Red. West
01/22/07
153.9
Red. West
01/22/07
107.3
Red. West
01/22/07
109.7
Red. West
01/22/07
129.9
Red. West
01/22/07
176.1
Red. West
02/19/07
102
Red. West
02/19/07
109.2
Red. West
02/19/07
107.5
Red. West
02/19/07
74.8
Red. West
02/19/07
44
Red. West
02/19/07
44.4
Red. West
02/19/07
58.4
Red. West
02/20/07
128.5
Red. West
02/20/07
124.4
Red. West
02/20/07
110
Red. West
02/20/07
126.1
Red. West
02/28/07
76.5
Red. West
02/28/07
72.7
Red. West
02/28/07
68.5
Red. West
02/28/07
62.5
Red. West
02/28/07
64.9
Red. West
03/05/07
43.4
Red. West
03/05/07
49.6
Red. West
03/05/07
56.8
Red. West
03/05/07
52.8
Red. West
03/05/07
41.1
Red. West
03/05/07
58.3
Red. West
03/1 2/07
36.9
Red. West
03/1 2/07
41.8
Red. West
03/1 2/07
47.9
Red. West
03/1 2/07
42.1
Red. West
03/1 2/07
40.4
Red. West
03/1 2/07
40.9
Red. West
03/1 2/07
42.8
F-645

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
03/1 2/07
43.8
Red. West
03/1 2/07
40.5
Red. West
03/1 2/07
39.3
Red. West
03/1 2/07
35
Red. West
03/1 2/07
29.5
Red. West
03/21/07
45.5
Red. West
03/21/07
47.8
Red. West
03/21/07
43
Red. West
03/21/07
42.1
Red. West
03/21/07
38.7
Red. West
03/21/07
30.2
Red. West
03/27/07
44.2
Red. West
03/27/07
37.6
Red. West
03/27/07
39.3
Red. West
03/27/07
40.4
Red. West
03/27/07
39.7
Red. West
03/27/07
41.5
Red. West
03/27/07
39.5
Red. West
03/27/07
37.4
Red. West
03/27/07
38.8
Red. West
03/27/07
45.1
Red. West
03/27/07
29.7
Red. West
03/27/07
31
Red. West
03/27/07
33.7
Red. West
04/1 2/07
18.8
Red. West
04/1 2/07
17.3
Red. West
04/1 2/07
15.2
Red. West
04/1 2/07
16.2
Red. West
04/1 2/07
17.5
Red. West
04/20/07
38.9
Red. West
04/20/07
38.2
Red. West
04/20/07
33.3
Red. West
04/20/07
34.4
Red. West
04/20/07
26.9
Red. West
10/03/07
29.3
Red. West
10/03/07
26.7
Red. West
10/03/07
23
Red. West
10/03/07
33.1
Red. West
10/03/07
21.2
Red. West
10/03/07
21.7
Red. West
10/03/07
8.4
Red. West
10/03/07
7.9
Red. West
10/03/07
12
Red. West
10/1 2/07
15.5
Red. West
10/1 2/07
12
F-646

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
10/1 2/07
12.3
Red. West
10/1 2/07
12
Red. West
10/1 2/07
10.8
Red. West
10/1 2/07
8.9
Red. West
10/26/07
33.1
Red. West
10/26/07
30.1
Red. West
10/26/07
22.3
Red. West
10/26/07
23.3
Red. West
10/26/07
25.5
Red. West
10/26/07
34.7
Red. West
10/26/07
28.2
Red. West
10/26/07
34.5
Red. West
10/26/07
43.1
Red. West
10/26/07
34.6
Red. West
10/26/07
35.2
Red. West
10/30/07
14.3
Red. West
10/30/07
20.5
Red. West
10/30/07
16.2
Red. West
10/30/07
18.5
Red. West
10/30/07
15.5
Red. West
10/30/07
14.9
Red. West
10/30/07
23.9
Red. West
10/30/07
24.5
Red. West
10/30/07
21.2
Red. West
10/30/07
34.1
Red. West
10/30/07
25.6
Red. West
10/30/07
25.4
Red. West
11/14/07
39.3
Red. West
11/14/07
24
Red. West
11/14/07
25.7
Red. West
11/14/07
24.1
Red. West
11/14/07
22.3
Red. West
11/14/07
20.5
Red. West
11/14/07
17.6
Red. West
11/14/07
16.7
Red. West
11/14/07
24
Red. West
11/16/07
68.5
Red. West
11/16/07
61.1
Red. West
11/16/07
53.4
Red. West
11/16/07
57.3
Red. West
1 2/03/07
66.3
Red. West
1 2/03/07
66.9
Red. West
1 2/03/07
67.7
Red. West
1 2/03/07
69.8
Red. West
1 2/03/07
68.3
F-647

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
1 2/03/07
68.2
Red. West
1 2/03/07
70.2
Red. West
1 2/03/07
71.4
Red. West
1 2/03/07
73.1
Red. West
1 2/03/07
74.2
Red. West
1 2/03/07
74.9
Red. West
1 2/03/07
75.6
Red. West
1 2/03/07
76
Red. West
1 2/03/07
76.7
Red. West
1 2/03/07
77.6
Red. West
1 2/03/07
78.6
Red. West
1 2/03/07
79.6
Red. West
1 2/03/07
80.8
Red. West
1 2/03/07
81.4
Red. West
1 2/03/07
81.5
Red. West
1 2/03/07
82.6
Red. West
1 2/03/07
82.4
Red. West
1 2/03/07
81.4
Red. West
1 2/03/07
79.5
Red. West
1 2/03/07
81.9
Red. West
1 2/03/07
84.5
Red. West
1 2/03/07
83.6
Red. West
1 2/03/07
85.5
Red. West
1 2/03/07
84.2
Red. West
1 2/03/07
83.2
Red. West
1 2/03/07
82.8
Red. West
1 2/03/07
82.6
Red. West
1 2/03/07
81.7
Red. West
1 2/03/07
82.5
Red. West
1 2/03/07
79.7
Red. West
1 2/03/07
77.4
Red. West
1 2/03/07
77.7
Red. West
1 2/03/07
77.9
Red. West
1 2/03/07
73.7
Red. West
1 2/03/07
67.8
Red. West
1 2/03/07
58.5
Red. West
1 2/03/07
51.3
Red. West
1 2/03/07
44.8
Red. West
1 2/03/07
41.9
Red. West
1 2/03/07
46.2
Red. West
1 2/03/07
46.6
Red. West
1 2/03/07
44.5
Red. West
1 2/03/07
52.8
Red. West
1 2/03/07
51.6
Red. West
1 2/03/07
4
F-648

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
1 2/04/07
93.9
Red. West
1 2/04/07
36.7
Red. West
1 2/04/07
38.2
Red. West
1 2/04/07
41.7
Red. West
1 2/04/07
45.3
Red. West
1 2/04/07
48.3
Red. West
1 2/04/07
50
Red. West
1 2/04/07
49.4
Red. West
1 2/04/07
47.4
Red. West
1 2/04/07
44.8
Red. West
1 2/04/07
43.6
Red. West
1 2/04/07
43.7
Red. West
1 2/04/07
46
Red. West
1 2/04/07
52.1
Red. West
1 2/04/07
58.1
Red. West
1 2/04/07
183.1
Red. West
12/23/07
76.2
Red. West
12/23/07
74.2
Red. West
12/23/07
70.5
Red. West
12/23/07
64.3
Red. West
12/23/07
59.2
Red. West
12/23/07
51.2
Red. West
12/23/07
74.8
Red. West
12/31/07
38.2
Red. West
12/31/07
31.9
Red. West
12/31/07
29.6
Red. West
12/31/07
28.8
Red. West
12/31/07
32.9
Red. West
12/31/07
38.3
Red. West
12/31/07
70.1
Red. West
12/31/07
1.6
Red. West
01/03/08
57.6
Red. West
01/03/08
56.1
Red. West
01/03/08
54.7
Red. West
01/03/08
49.3
Red. West
01/03/08
46.7
Red. West
01/03/08
76.3
Red. West
01/14/08
85.8
Red. West
01/14/08
87.5
Red. West
01/14/08
92.9
Red. West
01/14/08
103.4
Red. West
01/14/08
95.2
Red. West
01/14/08
89.2
Red. West
01/14/08
90.7
Red. West
01/14/08
82.7
F-649

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
01/14/08
105.5
Red. West
02/01/08
30.5
Red. West
02/01/08
30.8
Red. West
02/01/08
32.2
Red. West
02/01/08
33.2
Red. West
02/01/08
31.5
Red. West
02/01/08
31.8
Red. West
02/01/08
34.2
Red. West
02/01/08
38.3
Red. West
02/01/08
52.2
Red. West
02/01/08
60.8
Red. West
02/1 2/08
33.2
Red. West
02/1 2/08
31
Red. West
02/1 2/08
28
Red. West
02/1 2/08
25.9
Red. West
02/1 2/08
24.1
Red. West
02/1 2/08
23.8
Red. West
02/1 2/08
23.8
Red. West
02/1 2/08
23
Red. West
02/1 2/08
26.7
Red. West
02/1 2/08
70.1
Red. West
03/20/08
18.4
Red. West
03/20/08
14
Red. West
03/20/08
13.3
Red. West
03/20/08
12.9
Red. West
03/20/08
13
Red. West
03/20/08
13.9
Red. West
03/20/08
17.7
Red. West
03/20/08
26.6
Red. West
04/01/08
20.2
Red. West
04/01/08
37.2
Red. West
04/01/08
19.3
Red. West
04/01/08
18.9
Red. West
04/01/08
19.4
Red. West
04/01/08
19.7
Red. West
04/01/08
17.5
Red. West
04/01/08
16.2
Red. West
04/01/08
43.3
Red. West
04/01/08
12.5
Red. West
04/01/08
21.3
Red. West
04/01/08
16.1
Red. West
04/01/08
23.7
Red. West
04/01/08
1.4
Red. West
04/1 7/08
12.6
Red. West
04/1 7/08
14.5
F-650

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
Red. West
04/1 7/08
34.2
Red. West
04/23/08
19.1
Red. West
04/23/08
13
Red. West
04/23/08
15.6
Red. West
04/23/08
15.5
Red. West
04/23/08
11.6
Red. West
04/23/08
12.1
Red. West
04/23/08
8.2
Red. West
04/23/08
7.8
SEAAIR
04/01/05
171.54
SEAAIR
04/01/05
56.41
SEAAIR
04/01/05
127.68
SEAAIR
04/01/05
138.01
SEAAIR
04/01/05
136.12
SEAAIR
04/01/05
136.75
SEAAIR
04/01/05
138.79
SEAAIR
04/01/05
138.16
SEAAIR
04/01/05
116.48
SEAAIR
04/01/05
113.94
SEAAIR
04/01/05
134.03
SEAAIR
04/01/05
144.07
SEAAIR
04/01/05
145.42
SEAAIR
04/01/05
145.16
SEAAIR
04/01/05
126.08
SEAAIR
04/01/05
120.36
SEAAIR
04/01/05
137.15
SEAAIR
04/01/05
149.65
SEAAIR
04/01/05
157.7
SEAAIR
04/01/05
148.28
SEAAIR
04/01/05
126.78
SEAAIR
04/01/05
120.95
SEAAIR
04/01/05
139.15
SEAAIR
04/01/05
158.03
SEAAIR
04/01/05
154.1
SEAAIR
04/01/05
129.96
SEAAIR
04/01/05
126.86
SEAAIR
04/01/05
138.07
SEAAIR
04/01/05
150.14
SEAAIR
04/01/05
157.22
SEAAIR
04/01/05
165.5
SEAAIR
04/01/05
136.84
SEAAIR
04/01/05
126.45
SEAAIR
04/01/05
143.77
SEAAIR
04/01/05
164.92
SEAAIR
04/01/05
169.73
F-651

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/01/05
159.02
SEAAIR
04/01/05
137.03
SEAAIR
04/01/05
133.54
SEAAIR
04/01/05
153.83
SEAAIR
04/01/05
168.05
SEAAIR
04/01/05
173.66
SEAAIR
04/01/05
148.51
SEAAIR
04/01/05
140.8
SEAAIR
04/01/05
142.1
SEAAIR
04/01/05
155.52
SEAAIR
04/01/05
166.43
SEAAIR
04/01/05
170.27
SEAAIR
04/01/05
135.32
SEAAIR
04/01/05
116.33
SEAAIR
04/01/05
119.09
SEAAIR
04/01/05
121.32
SEAAIR
04/01/05
127.89
SEAAIR
04/01/05
121.41
SEAAIR
04/01/05
118.48
SEAAIR
04/01/05
110.94
SEAAIR
04/01/05
112.23
SEAAIR
04/01/05
124.24
SEAAIR
04/01/05
127.88
SEAAIR
04/01/05
117.92
SEAAIR
04/01/05
109.68
SEAAIR
04/01/05
113.36
SEAAIR
04/01/05
119.21
SEAAIR
04/01/05
123.75
SEAAIR
04/01/05
112.59
SEAAIR
04/01/05
114.96
SEAAIR
04/01/05
110.16
SEAAIR
04/01/05
113.52
SEAAIR
04/01/05
121.99
SEAAIR
04/01/05
127.39
SEAAIR
04/01/05
119.59
SEAAIR
04/01/05
108.24
SEAAIR
04/01/05
113.61
SEAAIR
04/01/05
121.89
SEAAIR
04/01/05
123.94
SEAAIR
04/01/05
112
SEAAIR
04/01/05
115.24
SEAAIR
04/01/05
111.8
SEAAIR
04/01/05
116.98
SEAAIR
04/01/05
125.61
SEAAIR
04/01/05
120.96
F-652

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/01/05
113.06
SEAAIR
04/01/05
111.32
SEAAIR
04/01/05
114.92
SEAAIR
04/01/05
125.44
SEAAIR
04/01/05
122.48
SEAAIR
04/01/05
115.86
SEAAIR
04/03/05
79.01
SEAAIR
04/03/05
58.11
SEAAIR
04/03/05
106.37
SEAAIR
04/03/05
112.25
SEAAIR
04/03/05
111.73
SEAAIR
04/03/05
115.87
SEAAIR
04/03/05
118.65
SEAAIR
04/03/05
121.31
SEAAIR
04/03/05
124.09
SEAAIR
04/03/05
124.14
SEAAIR
04/03/05
124.06
SEAAIR
04/03/05
125.96
SEAAIR
04/03/05
124.35
SEAAIR
04/03/05
124.47
SEAAIR
04/03/05
127.77
SEAAIR
04/03/05
129.18
SEAAIR
04/03/05
127.85
SEAAIR
04/03/05
126.83
SEAAIR
04/03/05
126.89
SEAAIR
04/03/05
124.58
SEAAIR
04/03/05
123.4
SEAAIR
04/03/05
124.71
SEAAIR
04/03/05
127.32
SEAAIR
04/03/05
124.38
SEAAIR
04/03/05
123.34
SEAAIR
04/03/05
124.11
SEAAIR
04/03/05
124.34
SEAAIR
04/03/05
125.77
SEAAIR
04/03/05
137.95
SEAAIR
04/03/05
169.4
SEAAIR
04/03/05
195.9
SEAAIR
04/03/05
203.59
SEAAIR
04/03/05
209.22
SEAAIR
04/03/05
201.44
SEAAIR
04/03/05
183
SEAAIR
04/03/05
167.8
SEAAIR
04/03/05
149
SEAAIR
04/03/05
122.39
SEAAIR
04/03/05
107.76
F-653

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/03/05
98.2
SEAAIR
04/03/05
97.12
SEAAIR
04/03/05
97.67
SEAAIR
04/03/05
87.09
SEAAIR
04/03/05
88.53
SEAAIR
04/11/05
40.78
SEAAIR
04/11/05
51.45
SEAAIR
04/11/05
78.05
SEAAIR
04/11/05
76.21
SEAAIR
04/11/05
73.64
SEAAIR
04/11/05
77.47
SEAAIR
04/11/05
78.82
SEAAIR
04/11/05
79.01
SEAAIR
04/11/05
86.97
SEAAIR
04/11/05
90.29
SEAAIR
04/11/05
CO
CO
CO
SEAAIR
04/11/05
88.96
SEAAIR
04/11/05
89.05
SEAAIR
04/11/05
85.31
SEAAIR
04/11/05
89.44
SEAAIR
04/11/05
94.46
SEAAIR
04/11/05
91
SEAAIR
04/11/05
90.91
SEAAIR
04/11/05
92.27
SEAAIR
04/11/05
91.66
SEAAIR
04/11/05
88.4
SEAAIR
04/11/05
90.23
SEAAIR
04/11/05
89.94
SEAAIR
04/11/05
88.14
SEAAIR
04/11/05
88.02
SEAAIR
04/11/05
86.14
SEAAIR
04/11/05
80.65
SEAAIR
04/11/05
83.71
SEAAIR
04/11/05
86.47
SEAAIR
04/11/05
83.8
SEAAIR
04/11/05
82.69
SEAAIR
04/11/05
82.78
SEAAIR
04/11/05
80.86
SEAAIR
04/11/05
80.86
SEAAIR
04/11/05
81.38
SEAAIR
04/11/05
85.92
SEAAIR
04/11/05
79.08
SEAAIR
04/11/05
79.66
SEAAIR
04/11/05
82.85
SEAAIR
04/11/05
77.88
F-654

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/1 2/05
33.32
SEAAIR
04/1 2/05
52.53
SEAAIR
04/1 2/05
63.07
SEAAIR
04/1 2/05
69.43
SEAAIR
04/1 2/05
69.88
SEAAIR
04/1 2/05
75.94
SEAAIR
04/1 2/05
81.78
SEAAIR
04/1 2/05
73.61
SEAAIR
04/1 2/05
78.83
SEAAIR
04/1 2/05
83.6
SEAAIR
04/1 2/05
79.59
SEAAIR
04/1 2/05
79.17
SEAAIR
04/1 2/05
82.54
SEAAIR
04/1 2/05
77.85
SEAAIR
04/1 2/05
77.94
SEAAIR
04/1 2/05
82.59
SEAAIR
04/1 2/05
79.9
SEAAIR
04/1 2/05
80.4
SEAAIR
04/1 2/05
81.81
SEAAIR
04/1 2/05
76.89
SEAAIR
04/1 2/05
78.82
SEAAIR
04/1 2/05
83.33
SEAAIR
04/1 2/05
80.06
SEAAIR
04/1 2/05
81.17
SEAAIR
04/1 2/05
82.61
SEAAIR
04/1 2/05
77.58
SEAAIR
04/1 2/05
78.05
SEAAIR
04/1 2/05
82.32
SEAAIR
04/1 2/05
80.7
SEAAIR
04/1 2/05
81.08
SEAAIR
04/1 2/05
82.26
SEAAIR
04/1 2/05
78.84
SEAAIR
04/1 2/05
82.48
SEAAIR
04/1 2/05
91.67
SEAAIR
04/1 2/05
94.62
SEAAIR
04/1 2/05
96.3
SEAAIR
04/16/05
185
SEAAIR
04/16/05
173.75
SEAAIR
04/16/05
165.38
SEAAIR
04/16/05
168.27
SEAAIR
04/16/05
176.92
SEAAIR
04/16/05
179.8
SEAAIR
04/16/05
165.36
SEAAIR
04/16/05
157.82
SEAAIR
04/16/05
160.41
F-655

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/16/05
140.42
SEAAIR
04/16/05
147.74
SEAAIR
04/16/05
148.79
SEAAIR
04/16/05
133.56
SEAAIR
04/16/05
142.5
SEAAIR
04/16/05
147.17
SEAAIR
04/16/05
148.08
SEAAIR
04/16/05
146.78
SEAAIR
04/16/05
147.24
SEAAIR
04/16/05
152.5
SEAAIR
04/16/05
147.95
SEAAIR
04/16/05
144.34
SEAAIR
04/16/05
150.51
SEAAIR
04/18/05
95.89
SEAAIR
04/18/05
109.48
SEAAIR
04/18/05
133.33
SEAAIR
04/18/05
130.57
SEAAIR
04/18/05
125.31
SEAAIR
04/18/05
120.41
SEAAIR
04/18/05
117.5
SEAAIR
04/18/05
117.42
SEAAIR
04/18/05
117.91
SEAAIR
04/18/05
116.66
SEAAIR
04/18/05
116.16
SEAAIR
04/18/05
116.26
SEAAIR
04/18/05
117.31
SEAAIR
04/18/05
117.39
SEAAIR
04/18/05
116.67
SEAAIR
04/18/05
117.81
SEAAIR
04/18/05
117.77
SEAAIR
04/18/05
118.15
SEAAIR
04/18/05
118.01
SEAAIR
04/18/05
119.5
SEAAIR
04/18/05
119.74
SEAAIR
04/18/05
121.63
SEAAIR
04/18/05
119.09
SEAAIR
04/18/05
108.09
SEAAIR
04/18/05
108.14
SEAAIR
04/18/05
107.91
SEAAIR
04/18/05
107.69
SEAAIR
04/18/05
109.34
SEAAIR
04/18/05
108.73
SEAAIR
04/18/05
108.36
SEAAIR
04/18/05
108.29
SEAAIR
04/18/05
109.53
F-656

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/18/05
109.41
SEAAIR
04/18/05
109.59
SEAAIR
04/18/05
110.66
SEAAIR
04/18/05
113.89
SEAAIR
04/18/05
114.93
SEAAIR
04/18/05
116.75
SEAAIR
04/18/05
117.6
SEAAIR
04/18/05
121.01
SEAAIR
04/18/05
122.39
SEAAIR
04/18/05
123.88
SEAAIR
04/18/05
124.65
SEAAIR
04/18/05
126.37
SEAAIR
04/19/05
114.34
SEAAIR
04/19/05
124.52
SEAAIR
04/19/05
124.24
SEAAIR
04/19/05
122
SEAAIR
04/19/05
107.99
SEAAIR
04/19/05
107.19
SEAAIR
04/19/05
107.14
SEAAIR
04/19/05
108.22
SEAAIR
04/19/05
107.9
SEAAIR
04/19/05
107
SEAAIR
04/19/05
106.73
SEAAIR
04/19/05
106.11
SEAAIR
04/19/05
106.04
SEAAIR
04/19/05
105.87
SEAAIR
04/19/05
105.16
SEAAIR
04/19/05
104.8
SEAAIR
04/19/05
104.66
SEAAIR
04/19/05
105.15
SEAAIR
04/19/05
104.83
SEAAIR
04/19/05
104.75
SEAAIR
04/19/05
104.64
SEAAIR
04/19/05
104.54
SEAAIR
04/19/05
104.61
SEAAIR
04/19/05
104.92
SEAAIR
04/19/05
105.08
SEAAIR
04/19/05
105.65
SEAAIR
04/19/05
105.53
SEAAIR
04/19/05
106.06
SEAAIR
04/19/05
103.03
SEAAIR
04/19/05
102.6
SEAAIR
04/19/05
102.08
SEAAIR
04/19/05
101.72
SEAAIR
04/19/05
101.75
F-657

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/19/05
102.01
SEAAIR
04/19/05
101.66
SEAAIR
04/19/05
101.39
SEAAIR
04/19/05
101.29
SEAAIR
04/19/05
101.55
SEAAIR
04/19/05
101.73
SEAAIR
04/19/05
101.48
SEAAIR
04/19/05
101.6
SEAAIR
04/19/05
101.18
SEAAIR
04/19/05
101.19
SEAAIR
04/19/05
101.2
SEAAIR
04/20/05
98.96
SEAAIR
04/20/05
99.85
SEAAIR
04/20/05
100.76
SEAAIR
04/20/05
99.42
SEAAIR
04/20/05
97.99
SEAAIR
04/20/05
97.33
SEAAIR
04/20/05
96.51
SEAAIR
04/20/05
96.91
SEAAIR
04/20/05
96.69
SEAAIR
04/20/05
96.26
SEAAIR
04/20/05
96.32
SEAAIR
04/20/05
95.79
SEAAIR
04/20/05
95.85
SEAAIR
04/20/05
96.26
SEAAIR
04/20/05
96.14
SEAAIR
04/20/05
96.15
SEAAIR
04/20/05
96.14
SEAAIR
04/20/05
96.23
SEAAIR
04/20/05
96.22
SEAAIR
04/20/05
96.87
SEAAIR
04/20/05
97.02
SEAAIR
04/20/05
96.53
SEAAIR
04/20/05
96.32
SEAAIR
04/20/05
96.19
SEAAIR
04/20/05
95.95
SEAAIR
04/26/05
39.12
SEAAIR
04/26/05
37.61
SEAAIR
04/26/05
72.06
SEAAIR
04/26/05
64.73
SEAAIR
04/26/05
49.02
SEAAIR
04/26/05
42.41
SEAAIR
04/26/05
36.8
SEAAIR
04/26/05
33.35
SEAAIR
04/26/05
35.19
F-658

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
SEAAIR
04/26/05
35.15
SEAAIR
04/26/05
31.92
SEAAIR
04/26/05
30.28
SEAAIR
04/26/05
29.14
SEAAIR
04/26/05
27.15
SEAAIR
04/26/05
30.13
SEAAIR
04/26/05
30.4
SEAAIR
04/26/05
28.05
SEAAIR
04/26/05
26.37
SEAAIR
04/26/05
26.82
SEAAIR
04/26/05
24.51
SEAAIR
04/26/05
25.67
SEAAIR
04/26/05
28.3
SEAAIR
04/26/05
26.65
SEAAIR
04/26/05
25.32
STCLLR*
224/1
175.9
STCLLR*
224/1
173.1
STCLLR*
224/1
233.3
STCLLR*
224/1
246.2
STCLLR*
224/1
257.4
STCLLR*
224/1
180.1
STCLLR*
224/1
57.9
STCLLR*
224/1
56.9
STCLLR*
224/1
113.2
STCLLR*
224/1
163.1
STCLLR*
224/1
208.4
STCLLR*
224/1
75.6
STCLLR*
226/1
96.4
STCLLR*
226/1
86.9
STCLLR*
226/1
77.6
STCLLR*
226/1
48.1
STCLLR*
226/1
38.4
STCLLR*
226/1
39.2
STCLLR*
226/1
73.7
STCLLR*
301/1
65.6
STCLLR*
301/1
65.7
STCLLR*
301/1
52.4
STCLLR*
301/1
50.2
STCLLR*
301/1
48.9
STCLLR*
301/1
61.8
STCLLR*
301/1
57.8
STCLLR*
301/1
56.9
STCLLR*
301/1
55
STCLLR*
301/1
35.7
STCLLR*
301/1
29.1
F-659

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
STCLLR*
301/1
23.4
STCLLR*
301/1
19.3
STCLLR*
301/1
20.2
STCLLR*
301/1
32.1
STCLLR*
302/1
33.9
STCLLR*
302/1
18.5
STCLLR*
302/1
35.1
STCLLR*
306/1
7.4
STCLLR*
306/1
6.8
STCLLR*
306/1
14.2
STCLLR*
306/1
16.3
STCLLR*
306/1
11.4
STCLLR*
309/1
85.1
STCLLR*
309/1
85.5
STCLLR*
309/1
69.3
STCLLR*
309/1
72.8
STCLLR*
309/1
81.9
STCLLR*
309/1
55.6
STCLLR*
309/1
44.4
STCLLR*
309/1
47.7
STCLLR*
309/1
30.2
STCLLR*
309/1
18.8
STCLLR*
309/1
18.7
STCLLR*
311/1
57.7
STCLLR*
311/1
55.8
STCLLR*
311/1
66.1
STCLLR*
311/1
81.8
STCLLR*
311/1
70.7
STCLLR*
311/1
54.5
STCLLR*
311/1
60.4
STCLLR*
311/1
58.5
STCLLR*
311/1
68
STCLLR*
311/1
102.1
STCLLR*
311/1
61.5
STCLLR*
311/1
47.9
STCLLR*
311/1
62.6
STCLLR*
311/1
63.7
STCLLR*
311/1
66.4
STCLLR*
311/1
33.5
STCLLR*
311/1
28.2
STCLLR*
311/1
31.1
STCLLR*
312/1
50
STCLLR*
312/1
60.2
STCLLR*
312/1
59.2
STCLLR*
312/1
65.2
F-660

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
STCLLR*
312/1
53.3
STCLLR*
312/1
51.8
STCLLR*
312/1
49
STCLLR*
312/1
49.5
STCLLR*
312/1
49.8
STCLLR*
312/1
56.6
STCLLR*
312/1
95.6
STCLLR*
312/1
53.4
STCLLR*
312/1
50.5
STCLLR*
312/1
50.7
STCLLR*
312/1
50.5
STCLLR*
312/1
60.2
STCLLR*
312/1
71.9
STCLLR*
312/1
42.9
STCLLR*
320/1
63
STCLLR*
320/1
75.7
STCLLR*
320/1
56
STCLLR*
320/1
57.7
STCLLR*
320/1
63
STCLLR*
320/1
146.9
STCLLR*
320/1
108
STCLLR*
320/1
96.1
STCLLR*
320/1
58.6
STCLLR*
320/1
60.6
STCLLR*
320/1
63.7
STCLLR*
320/1
90.3
STCLLR*
320/1
139.1
STCLLR*
320/1
65
STCLLR*
320/1
50.9
STCLLR*
320/1
7.8
STCLLR*
320/1
13.2
STCLLR*
322/1
64.8
STCLLR*
322/1
39.9
STCLLR*
322/1
41.5
STCLLR*
322/1
54.9
STCLLR*
322/1
48.8
STCLLR*
322/1
35.9
STCLLR*
322/1
40
STCLLR*
322/1
52.4
STCLLR*
322/1
28.8
STCLLR*
322/1
27.7
STCLLR*
322/1
22.3
STCLLR*
324/1
39
STCLLR*
324/1
41.2
STCLLR*
324/1
88
F-661

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
STCLLR*
324/1
113.4
STCLLR*
324/1
132.8
STCLLR*
324/1
50.7
STCLLR*
324/1
68.7
STCLLR*
324/1
45.3
STCLLR*
324/1
73.1
STCLLR*
324/1
78.5
STCLLR*
324/1
90.9
STCLLR*
324/1
55.2
STCLLR*
324/1
75.1
STCLLR*
324/1
73.5
STCLLR*
324/1
87.2
STCLLR*
324/1
95.6
STCLLR*
324/1
91.4
STCLLR*
324/1
83.4
STCLLR*
324/1
75.1
STCLLR*
324/1
71.9
STCLLR*
324/1
73.4
STCLLR*
324/1
79.3
STCLLR*
324/1
83.7
STCLLR*
324/1
81.8
STCLLR*
324/1
55.4
STCLLR*
324/1
9.3
STCLLR*
327/1
80.9
STCLLR*
327/1
61.3
STCLLR*
327/1
51.5
STCLLR*
327/1
69.2
STCLLR*
327/1
88.9
STCLLR*
327/1
53.3
STCLLR*
327/1
54.6
STCLLR*
327/1
56.6
STCLLR*
327/1
67.6
STCLLR*
327/1
84.1
STCLLR*
327/1
22.8
STCLLR*
327/1
17.9
STCLLR*
330/1
95.2
STCLLR*
330/1
52.7
STCLLR*
330/1
53
STCLLR*
330/1
74.8
STCLLR*
330/1
51.9
STCLLR*
330/1
28.7
STCLLR*
330/1
8.5
STCLLR*
330/1
7.5
STCLLR*
330/1
9.9
STCLLR*
330/1
120.4
F-662

-------
Appendix F: Turbidity Report Tables
Listing 1: Turbidity of Effluent from Passive Treatment Measurements as Reported
Site/system
Date
Effluent from passive treatment (NTU)
STCLLR*
402/1
238.8
STCLLR*
402/1
78.9
STCLLR*
402/1
89.7
STCLLR*
402/1
47.9
STCLLR*
402/1
44.8
STCLLR*
402/1
53.3
STCLLR*
402/1
55.9
STCLLR*
402/1
61.4
STCLLR*
402/1
23.5
STCLLR*
402/1
4.9
STCLLR*
416/1
126.1
STCLLR*
416/1
72.2
STCLLR*
416/1
62.3
STCLLR*
416/1
47.2
STCLLR*
416/1
58.6
STCLLR*
416/1
102.3
STCLLR*
416/1
33.2
STCLLR*
416/1
22.6
STCLLR*
416/1
24.9
STCLLR*
416/1
4.7
STCLLR*
503/1
24.3
STCLLR*
503/1
20.8
STCLLR*
503/1
8.2
STCLLR*
521/1
120.4
STCLLR*
521/1
131.4
STCLLR*
521/1
131.4
STCLLR*
521/1
163.7
STCLLR*
521/1
293.9
STCLLR*
521/1
14.6
STCLLR*
521/1
51.2
STCLLR*
521/1
7.9
'Dates are as reported.
F-663

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
BHRBP2
10/18/06
52.69
43
67.72
3.1
359.80
BHRBP2
10/19/06
125.47
48
30.30
76.2
169.90
BHRBP2
10/20/06
106.20
3
65.31
67.1
181.60
BHRBP2
10/23/06
129.33
6
48.97
33.3
171.40
BHRBP2
10/24/06
40.76
15
18.77
12.9
73.10
BHRBP2
10/25/06
45.84
27
8.39
26.1
58.50
BHRBP2
10/26/06
52.30
22
18.99
16.2
101.40
BHRBP2
11/05/06
128.43
49
202.02
17.0
989.70
BHRBP2
11/06/06
146.06
79
179.20
14.1
926.70
BHRBP2
11/07/06
153.01
90
154.96
17.6
692.10
BHRBP2
11/08/06
122.13
81
168.83
7.8
769.00
BHRBP2
11/09/06
95.36
60
168.95
6.3
902.20
BHRBP2
11/10/06
23.53
36
18.86
7.5
74.70
BHRBP2
11/11/06
20.44
26
19.54
8.1
107.10
BHRBP2
11/1 2/06
18.31
25
10.65
9.8
52.80
BHRBP2
11/1 3/06
28.27
45
28.86
9.6
130.70
BHRBP2
11/14/06
36.57
70
30.58
11.7
172.90
BHRBP2
11/15/06
39.48
66
53.86
9.7
328.30
BHRBP2
11/16/06
68.48
54
76.02
12.6
476.70
BHRBP2
11/1 7/06
39.74
19
68.41
11.0
319.80
BHRBP2
11/20/06
25.49
20
13.57
13.9
76.60
BHRBP2
11/21/06
29.64
41
32.93
14.7
230.70
BHRBP2
11/22/06
49.30
27
68.00
9.1
304.80
BHRBP2
11/23/06
32.41
18
30.05
12.7
124.00
BHRBP2
11/24/06
40.16
26
51.34
10.0
276.80
BHRBP2
11/25/06
21.85
17
9.83
9.3
49.50
BHRBP2
11/27/06
43.63
35
58.92
4.2
319.30
BHRBP2
12/01/06
12.00
7
9.85
4.8
33.90
BHRBP2
1 2/02/06
38.00
2
19.80
24.0
52.00
BHRBP2
12/11/06
76.32
34
35.74
12.1
150.70
BHRBP2
1 2/1 2/06
53.40
18
58.22
18.8
271.30
BHRBP2
1 2/1 3/06
44.85
29
26.60
18.2
144.80
BHRBP2
1 2/14/06
52.08
38
60.48
15.6
318.80
BHRBP2
1 2/15/06
70.88
40
65.42
12.4
320.20
BHRBP2
1 2/16/06
165.09
20
207.31
22.0
834.30
BHRBP2
1 2/1 7/06
88.54
31
97.10
6.9
472.10
BHRBP2
1 2/18/06
56.18
18
55.54
14.6
246.80
BHRBP2
1 2/19/06
42.72
26
27.50
11.8
106.60
BHRBP2
1 2/20/06
38.36
19
30.32
7.3
112.40
BHRBP2
12/21/06
46.32
25
43.10
9.2
214.90
BHRBP2
12/22/06
26.03
29
11.42
9.6
64.50
BHRBP2
12/23/06
30.09
23
15.48
12.2
71.80
F-664

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
BHRBP2
1 2/26/06
26.26
24
11.43
7.9
57.30
BHRBP2
12/27/06
31.17
41
28.59
9.0
163.60
BHRBP2
1 2/28/06
25.46
34
21.16
7.8
113.20
BHRBP2
1 2/29/06
29.66
31
28.66
9.1
149.80
BHRBP2
1 2/30/06
27.54
23
18.90
8.4
74.10
BHRBP2
01/02/07
37.22
54
40.97
7.3
202.50
BHRBP2
01/03/07
61.66
43
106.99
9.8
709.90
BHRBP2
01/04/07
31.64
28
30.51
8.5
146.20
BHRBP2
01/06/07
22.48
21
18.18
9.2
96.50
BHRBP2
01/08/07
39.54
30
40.32
8.0
178.90
BHRBP2
01/09/07
96.39
15
140.50
13.5
584.10
BHRBP2
01/1 7/07
26.66
25
14.20
3.7
58.40
BHRBP2
01/18/07
32.52
23
26.80
11.5
143.80
BHRBP2
02/02/07
46.91
19
37.94
12.4
192.40
BHRBP2
02/08/07
58.51
18
50.52
12.5
185.50
BHRBP2
02/15/07
35.33
16
12.87
13.0
69.30
BHRBP2
02/16/07
34.89
15
20.78
12.7
86.50
BHRBP2
03/06/07
49.70
11
33.67
14.1
130.60
BHRBP2
03/09/07
63.27
21
76.00
18.0
326.80
BHRBP2
03/15/07
58.05
14
72.52
16.4
299.40
BHRBP2
03/21/07
43.61
17
18.18
21.8
90.70
BHRBP2
03/23/07
69.83
15
49.18
19.4
184.50
BHRBP2
03/26/07
63.21
17
28.86
24.8
141.50
BHRBP2
03/30/07
62.70
23
76.98
23.6
378.40
BHRBP2
04/06/07
55.81
16
29.77
26.0
142.20
BHRBP2
04/19/07
71.44
9
57.02
10.0
166.10
BHRBP2
05/24/07
95.03
24
38.04
68.9
248.90
BHRBP2
05/25/07
75.62
38
39.47
31.1
196.50
BHRBP2
10/18/07
68.29
14
14.21
41.4
106.30
BHRBP2
10/19/07
109.52
22
51.17
35.1
179.20
BHRBP2
10/23/07
117.10
24
22.50
74.0
156.90
BHRBP2
11/09/07
19.48
18
10.73
15.2
50.60
BHRBP2
11/1 2/07
55.38
17
55.45
4.7
151.10
BHRBP2
11/1 3/07
119.17
6
51.55
15.1
150.60
BHRBP2
11/16/07
120.11
20
41.19
16.1
177.80
BHRBP2
11/23/07
122.45
17
26.82
90.7
214.90
BHRBP2
1 2/03/07
527.75
22
289.89
138.6
950.30
BHRBP2
1 2/04/07
194.77
45
34.60
130.4
248.60
BHRBP2
1 2/05/07
107.62
66
27.60
69.5
206.20
BHRBP2
1 2/06/07
86.50
96
18.06
57.3
140.10
BHRBP2
1 2/07/07
109.90
53
19.53
63.4
183.20
BHRBP2
1 2/10/07
136.59
28
34.26
7.7
182.20
BHRBP2
12/11/07
82.94
19
23.06
50.0
129.10
F-665

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
BHRBP2
1 2/19/07
156.18
21
14.29
132.5
180.70
BHRBP2
1 2/20/07
117.54
12
36.52
86.7
230.90
BHRBP2
1 2/26/07
104.60
21
22.85
45.5
134.40
BHRBP2
12/27/07
125.35
24
59.84
97.1
401.80
BHRBP2
01/03/08
75.68
11
33.04
11.7
128.30
BHRBP2
01/04/08
71.98
18
38.25
9.1
117.40
BHRBP2
01/05/08
94.07
20
31.71
7.9
147.90
BHRBP2
01/08/08
99.93
27
17.43
64.3
119.50
BHRBP2
01/16/08
103.66
41
23.98
9.4
135.60
BHRBP2
01/30/08
54.39
25
11.16
10.0
66.50
BHRBP2
01/31/08
43.56
14
20.29
8.0
74.60
BHRBP2
02/07/08
74.65
27
22.71
10.2
94.40
BHRBP2
02/18/08
51.87
20
17.34
23.0
110.60
BHRBP2
02/19/08
43.04
16
11.15
35.9
76.50
BHRBP2
03/07/08
65.92
31
19.20
8.0
125.20
BHRBP2
03/14/08
107.16
36
30.35
5.0
148.00
BHRBP2
03/18/08
66.81
22
18.89
43.5
142.00
BHRBP2
03/20/08
32.02
23
11.95
3.3
71.20
BHRBP2
03/21/08
27.27
30
6.05
19.6
54.90
BHRBP2
04/08/08
19.36
7
14.77
10.3
49.20
BHRBP2
04/09/08
48.58
31
11.98
25.5
84.40
BHRBP2
04/10/08
38.50
24
3.02
34.9
48.20
BHRBP2
04/11/08
38.40
33
2.46
36.9
51.40
BHRBP2
04/14/08
29.33
18
3.69
26.5
40.40
BHRBP2
04/15/08
31.99
28
3.44
27.6
38.20
BHRBP2
04/16/08
37.71
21
4.95
33.1
50.70
BHRBP2
04/1 7/08
32.23
25
4.54
22.6
45.00
BHRBP2
04/22/08
36.68
24
2.87
31.3
44.30
BHRBP2
04/23/08
59.59
14
22.61
44.9
136.30
BHRBP2
04/28/08
91.00
29
25.38
41.0
134.60
BHRBP2
04/29/08
121.49
28
56.47
82.0
386.70
BWWTP
01/06/07
151.30
30
39.92
2.7
284.00
BWWTP
01/08/07
143.42
22
34.42
3.6
175.50
BWWTP
01/09/07
124.32
27
29.33
4.6
180.30
BWWTP
02/09/07
18.60
3
5.99
13.5
25.20
BWWTP
03/02/07
12.70
2
1.56
11.6
13.80
BWWTP
03/21/07
40.16
9
22.98
5.9
64.10
BWWTP
05/11/07
29.60
8
9.28
16.5
39.40
BWWTP
05/14/07
27.33
3
16.25
8.6
37.60
KC1.1
1 2/02/07
44.67
57
13.59
10.9
93.00
KC1.1
1 2/03/07
95.44
94
33.42
30.1
222.70
KC1.1
1 2/04/07
68.23
93
24.74
53.0
301.70
KC1.1
1 2/05/07
70.80
94
18.26
43.9
136.50
F-666

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
KC1.1
1 2/06/07
103.39
95
97.65
33.6
365.20
KC1.1
1 2/07/07
51.99
46
34.63
22.8
250.20
KC1.1
1 2/08/07
48.65
23
11.97
21.8
69.50
KC1.1
12/11/07
44.66
41
29.51
10.3
164.80
KC1.1
1 2/1 2/07
50.04
31
9.26
35.3
80.00
KC1.1
1 2/18/07
21.85
2
13.93
12.0
31.70
KC1.1
1 2/19/07
32.67
43
10.22
10.9
50.80
KC1.1
1 2/20/07
48.70
94
7.91
35.7
65.40
KC1.1
12/23/07
39.02
59
12.09
9.1
91.20
KC1.1
12/27/07
30.67
18
11.37
6.0
49.30
KC1.1
1 2/28/07
39.77
43
8.94
26.6
55.10
KC1.1
01/02/08
58.89
59
12.78
8.3
90.50
KC1.1
01/03/08
58.79
49
7.81
46.4
74.40
KC1.1
01/05/08
53.97
58
21.00
8.0
186.30
KC1.1
01/06/08
44.50
1

44.5
44.50
KC1.1
01/08/08
49.50
91
6.70
24.8
58.90
KC1.1
01/09/08
55.00
54
12.69
30.9
101.90
KC1.1
01/10/08
76.36
16
18.36
65.2
125.20
KC1.1
01/11/08
56.97
39
11.02
36.3
114.00
KC1.1
01/1 2/08
88.15
17
48.51
30.3
203.10
KC1.1
01/14/08
59.37
42
15.61
35.5
94.40
KC1.1
01/15/08
44.23
62
8.09
12.4
62.60
KC1.1
01/24/08
41.37
34
14.39
8.1
79.20
KC1.1
01/25/08
52.91
19
12.69
46.2
99.80
KC1.2
1 2/02/07
42.36
57
12.74
8.3
76.90
KC1.2
1 2/03/07
106.79
94
36.91
38.0
192.60
KC1.2
1 2/04/07
84.72
93
40.62
62.4
231.30
KC1.2
1 2/05/07
79.99
94
15.75
55.8
116.50
KC1.2
1 2/06/07
117.17
95
105.22
31.3
388.20
KC1.2
1 2/07/07
62.65
43
41.04
32.8
230.20
KC1.2
1 2/08/07
60.37
23
47.59
32.6
272.30
KC1.2
12/11/07
43.66
31
29.20
20.5
164.40
KC1.2
1 2/1 2/07
64.54
30
24.13
37.3
114.20
KC1.2
1 2/18/07
13.90
2
6.51
9.3
18.50
KC1.2
1 2/19/07
54.00
45
44.82
8.9
179.90
KC1.2
1 2/20/07
50.12
95
16.35
32.4
181.00
KC1.2
12/21/07
44.10
1

44.1
44.10
KC1.2
12/23/07
36.24
60
9.10
7.2
66.70
KC1.2
12/27/07
30.40
17
7.82
CO
CO
40.60
KC1.2
1 2/28/07
38.43
44
8.81
23.5
59.30
KC1.2
01/02/08
56.24
59
11.97
6.7
86.40
KC1.2
01/03/08
55.86
50
7.82
44.5
73.70
KC1.2
01/05/08
51.50
63
28.94
9.7
263.60
F-667

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
KC1.2
01/06/08
41.30
1

41.3
41.30
KC1.2
01/08/08
47.99
92
9.83
9.7
104.60
KC1.2
01/09/08
50.65
93
11.88
29.7
85.40
KC1.2
01/10/08
62.10
73
12.42
27.2
109.40
KC1.2
01/11/08
53.72
94
4.19
38.5
63.20
KC1.2
01/1 2/08
84.10
67
41.76
32.0
209.20
KC1.2
01/14/08
52.67
64
16.35
10.9
94.20
KC1.2
01/15/08
42.86
61
6.61
26.1
59.50
KC1.2
01/24/08
40.89
33
12.26
8.7
55.80
KC1.2
01/25/08
48.89
21
2.17
45.8
54.40
KC1.2
01/28/08
45.28
16
16.39
9.2
58.20
KC1.2
01/29/08
45.83
62
9.35
28.0
101.90
KC1.2
01/30/08
38.11
50
14.14
13.8
61.10
KC1.3
01/02/08
55.74
59
11.49
7.2
83.80
KC1.3
01/03/08
56.19
49
8.50
39.8
76.60
KC1.3
01/05/08
49.45
63
12.27
6.6
103.60
KC1.3
01/06/08
44.40
1

44.4
44.40
KC1.3
01/08/08
47.54
92
8.29
9.8
60.40
KC1.3
01/09/08
49.92
93
11.86
31.4
84.00
KC1.3
01/10/08
63.01
73
12.11
28.1
103.80
KC1.3
01/11/08
52.60
93
3.99
36.4
62.70
KC1.3
01/1 2/08
85.66
66
41.54
32.1
213.90
KC1.3
01/14/08
41.76
21
10.01
14.2
66.40
KC1.4
01/28/08
52.53
15
18.79
29.8
114.30
KC1.4
01/29/08
43.42
63
5.11
29.4
50.90
KC1.4
01/30/08
38.63
49
13.43
17.3
69.50
KC1.5
01/02/08
38.82
59
10.41
5.2
94.80
KC1.5
01/03/08
40.92
49
4.67
32.8
52.40
KC1.5
01/05/08
36.23
62
14.54
14.0
144.00
KC1.5
01/06/08
32.80
1

32.8
32.80
KC1.5
01/08/08
36.82
52
10.65
6.6
58.30
KC1.5
01/09/08
38.72
61
11.27
16.0
71.10
KC1.5
01/10/08
47.98
73
9.41
26.8
70.60
KC1.5
01/11/08
44.29
93
2.84
35.7
51.60
KC1.5
01/1 2/08
75.88
68
38.95
28.2
193.00
KC1.5
01/14/08
43.28
64
15.50
11.9
91.00
KC1.5
01/15/08
33.93
61
4.33
23.2
47.20
KC1.5
01/24/08
37.93
31
11.33
12.1
62.90
KC1.5
01/25/08
47.67
20
5.97
43.8
67.70
KC1.5
01/28/08
43.19
16
13.09
26.8
86.20
KC1.5
01/29/08
35.17
63
3.86
25.4
44.50
KC1.5
01/30/08
32.13
49
10.68
16.6
49.00
KC2.1
1 2/02/07
111.05
42
27.36
74.2
159.10
F-668

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
KC2.1
1 2/03/07
154.77
88
50.12
58.9
404.40
KC2.1
1 2/04/07
131.37
91
25.54
39.5
179.60
KC2.1
1 2/05/07
117.59
93
21.19
55.3
156.40
KC2.1
1 2/06/07
109.45
92
26.43
41.8
179.00
KC2.1
1 2/07/07
125.49
91
82.87
51.0
637.50
KC2.1
1 2/08/07
85.52
91
14.27
39.0
119.30
KC2.1
1 2/09/07
84.96
71
20.68
52.0
135.10
KC2.1
1 2/10/07
57.03
50
17.99
26.4
86.20
KC2.1
1 2/15/07
64.50
26
31.79
22.5
205.80
KC2.1
1 2/1 7/07
61.22
54
11.89
10.7
87.90
KC2.1
1 2/18/07
95.46
60
52.59
20.9
206.00
KC2.1
1 2/19/07
132.35
93
58.17
37.2
333.50
KC2.1
1 2/20/07
110.48
93
34.15
57.9
204.50
KC2.1
12/21/07
74.79
65
16.51
42.3
128.10
KC2.1
12/22/07
104.63
54
40.93
10.2
185.90
KC2.1
12/23/07
51.97
15
10.90
32.1
73.60
KC2.1
1 2/24/07
66.26
13
8.85
57.5
82.60
KC2.1
1 2/26/07
63.66
18
16.23
33.2
95.80
KC2.1
12/27/07
83.75
23
53.50
8.0
233.60
KC2.1
1 2/28/07
51.60
42
9.57
32.7
92.10
KC2.1
1 2/29/07
48.78
13
21.19
26.1
100.40
KC2.1
01/02/08
29.59
32
9.91
12.8
66.60
KC2.1
01/08/08
23.32
66
4.42
16.0
44.00
KC2.1
01/09/08
32.44
5
0.39
31.8
32.80
KC2.1
01/10/08
47.35
65
5.99
37.5
75.10
KC2.1
01/11/08
46.56
64
9.75
32.2
95.40
KC2.1
01/12/08
62.58
44
12.38
24.1
72.90
KC2.1
01/14/08
81.62
5
17.83
64.6
110.70
KC2.1
01/15/08
115.60
1

115.6
115.60
KC2.1
01/26/08
51.82
21
16.91
31.1
102.20
KC2.1
01/27/08
73.98
23
26.73
55.9
192.70
KC2.1
01/30/08
72.78
12
8.06
52.0
82.40
KC2.2
1 2/02/07
84.40
80
30.26
29.8
149.50
KC2.2
1 2/03/07
155.12
90
71.95
57.7
644.80
KC2.2
1 2/04/07
128.93
90
25.61
43.0
175.20
KC2.2
1 2/05/07
111.10
93
24.72
3.4
148.60
KC2.2
1 2/06/07
102.10
92
24.97
40.4
175.30
KC2.2
1 2/07/07
114.76
93
53.75
49.2
380.40
KC2.2
1 2/08/07
82.66
89
14.25
37.7
120.70
KC2.2
1 2/09/07
79.41
50
20.56
47.9
121.40
KC2.2
1 2/10/07
54.51
50
17.02
27.6
81.60
KC2.2
1 2/15/07
55.88
25
11.03
24.9
67.90
KC2.2
1 2/1 7/07
58.28
56
11.72
13.4
84.70
F-669

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
KC2.2
1 2/18/07
92.65
54
bo. / O
17.6
202.70
KC2.2
1 2/19/07
132.92
58
38.68
81.2
246.30
KC2.2
1 2/20/07
106.39
93
32.34
55.9
192.60
KC2.2
12/21/07
72.87
41
19.68
44.1
120.70
KC2.2
12/22/07
99.37
54
35.97
10.7
170.20
KC2.2
12/23/07
51.16
53
12.06
21.1
73.30
KC2.2
1 2/24/07
64.00
12
8.13
56.0
78.10
KC2.2
1 2/26/07
56.93
18
17.41
10.1
88.50
KC2.2
12/27/07
84.26
23
60.21
7.3
275.80
KC2.2
1 2/28/07
48.15
70
10.46
14.4
88.70
KC2.2
1 2/29/07
45.48
51
16.29
25.0
142.30
KC2.2
01/02/08
21.12
11
7.43
11.9
34.70
KC2.2
01/04/08
24.98
13
5.02
19.6
31.80
KC2.2
01/14/08
94.64
5
13.26
77.4
106.70
KC2.2
01/15/08
192.14
19
35.04
139.0
300.60
KC2.2
01/28/08
53.88
20
4.21
44.0
60.60
KC2.2
01/29/08
51.59
39
11.23
30.5
92.80
KC2.2
01/30/08
71.13
15
19.54
2.5
81.70
KC2.2
01/31/08
69.28
19
10.14
33.9
81.10
KC2.3
1 2/02/07
59.71
91
22.90
4.4
115.30
KC2.3
1 2/03/07
129.46
90
76.03
56.5
574.00
KC2.3
1 2/04/07
101.97
92
25.68
46.8
169.70
KC2.3
1 2/05/07
74.40
93
11.06
53.2
99.20
KC2.3
1 2/06/07
74.97
92
19.95
42.3
166.00
KC2.3
1 2/07/07
77.48
92
36.67
43.3
319.30
KC2.3
1 2/08/07
68.87
91
10.71
38.2
115.80
KC2.3
1 2/09/07
72.38
37
10.24
46.0
96.50
KC2.3
1 2/10/07
46.12
49
12.72
26.5
68.20
KC2.3
1 2/15/07
58.30
25
16.17
25.4
116.80
KC2.3
1 2/1 7/07
55.05
57
13.83
9.5
85.30
KC2.3
1 2/18/07
90.39
58
50.53
20.5
197.80
KC2.3
1 2/19/07
130.94
93
57.77
34.1
346.10
KC2.3
1 2/20/07
107.42
93
35.27
10.1
195.60
KC2.3
12/21/07
73.20
65
16.32
40.4
122.50
KC2.3
12/22/07
99.88
52
32.41
49.8
167.80
KC2.3
12/23/07
45.48
26
8.50
30.9
70.70
KC2.3
1 2/24/07
67.40
2
13.44
57.9
76.90
KC2.3
1 2/26/07
59.64
18
19.94
11.0
108.40
KC2.3
12/27/07
76.46
24
51.75
6.7
243.80
KC2.3
1 2/28/07
47.88
69
11.97
14.3
101.20
KC2.3
1 2/29/07
46.81
50
18.46
25.0
145.60
KC2.3
01/02/08
26.16
44
7.31
12.0
37.20
KC2.3
01/03/08
21.65
24
3.55
5.7
24.90
F-670

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
KC2.3
01/04/08
33.62
10
1.48
31.4
35.10
KC2.3
01/05/08
33.21
16
4.52
21.8
41.30
KC2.3
01/07/08
22.18
33
2.84
18.9
31.40
KC2.3
01/08/08
22.76
70
4.23
14.7
31.90
KC2.3
01/09/08
25.90
16
3.63
21.0
32.80
KC2.3
01/10/08
53.20
82
19.35
29.0
193.70
KC2.3
01/11/08
49.31
60
5.61
43.8
76.00
KC2.3
01/12/08
80.21
49
18.47
26.5
97.00
KC2.3
01/14/08
49.19
23
4.34
42.6
62.30
KC2.3
01/20/08
50.92
9
7.64
36.3
58.90
KC2.3
01/21/08
59.35
2
0.92
58.7
60.00
KC2.3
01/26/08
41.98
29
10.85
24.6
60.60
KC2.3
01/27/08
66.95
19
13.70
49.6
116.70
KC2.3
01/28/08
49.79
21
5.73
36.5
58.40
KC2.3
01/29/08
47.42
38
7.23
29.0
70.40
KC2.3
01/31/08
64.52
24
13.71
30.8
78.40
KC2.4
1 2/02/07
75.67
91
31.72
10.4
150.80
KC2.4
1 2/03/07
152.17
91
79.39
74.2
695.20
KC2.4
1 2/04/07
118.03
93
24.24
50.2
172.30
KC2.4
1 2/05/07
95.88
94
20.83
69.3
206.60
KC2.4
1 2/06/07
89.49
92
21.67
32.3
151.80
KC2.4
1 2/07/07
103.10
69
33.78
49.2
289.60
KC2.4
01/02/08
27.44
36
8.57
12.3
53.30
KC2.4
01/03/08
23.52
23
0.98
22.2
26.10
KC2.4
01/04/08
30.70
19
6.28
20.7
37.30
KC2.4
01/05/08
35.77
17
4.19
31.1
43.80
KC2.4
01/07/08
24.34
32
3.27
21.4
36.50
KC2.4
01/08/08
24.03
70
4.49
15.7
34.10
KC2.4
01/09/08
25.08
16
4.19
20.7
35.30
KC2.4
01/10/08
48.18
82
7.48
30.4
77.40
KC2.4
01/11/08
45.19
61
7.13
32.8
59.60
KC2.4
01/12/08
64.34
49
11.93
27.0
75.20
KC2.4
01/14/08
48.80
25
4.70
34.8
54.30
KC2.4
01/20/08
51.49
10
8.31
38.3
60.90
KC2.4
01/21/08
64.40
1

64.4
64.40
KC2.4
01/26/08
42.33
6
41.49
21.0
125.70
KC2.4
01/29/08
56.61
16
12.96
37.4
92.40
KC2.4
01/30/08
69.24
19
13.21
38.7
82.40
KC2.4
01/31/08
64.27
22
15.25
31.3
80.50
KC2.5
1 2/02/07
53.34
90
19.05
CO
CO
106.30
KC2.5
1 2/03/07
117.74
91
65.63
54.9
525.00
KC2.5
1 2/04/07
87.87
93
23.67
40.4
156.20
KC2.5
1 2/05/07
66.52
94
14.54
47.4
148.90
F-671

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
KC2.5
1 2/06/07
64.23
92
17.07
1.8
137.70
KC2.5
1 2/07/07
71.01
93
51.70
39.3
348.10
KC2.5
1 2/08/07
62.88
90
12.78
42.1
152.00
KC2.5
1 2/09/07
61.11
36
6.33
46.9
73.70
KC2.5
1 2/18/07
84.58
5
37.43
59.5
150.70
KC2.5
1 2/19/07
100.29
93
53.27
30.3
330.60
KC2.5
1 2/20/07
83.12
92
25.05
46.8
166.60
KC2.5
12/21/07
64.40
50
11.84
35.9
95.30
KC2.5
12/22/07
91.19
52
105.80
32.9
695.70
KC2.5
12/23/07
34.08
43
5.35
20.0
43.20
KC2.5
1 2/24/07
40.00
1

40.0
40.00
KC2.5
1 2/26/07
39.65
18
5.47
32.3
56.80
KC2.5
12/27/07
55.40
24
45.73
7.3
233.10
KC2.5
1 2/28/07
39.06
70
23.77
13.5
218.70
KC2.5
1 2/29/07
34.92
51
12.07
22.5
99.70
KC3.1
1 2/02/07
60.14
44
6.80
43.7
67.70
KC3.1
1 2/03/07
79.02
96
13.98
61.8
169.20
KC3.1
1 2/04/07
69.40
96
11.22
58.3
157.10
KC3.1
1 2/05/07
65.82
19
16.79
57.1
134.60
KC3.1
12/11/07
34.68
10
11.19
27.6
56.80
KC3.1
1 2/1 7/07
35.92
34
6.75
22.6
55.60
KC3.1
1 2/18/07
41.70
59
6.63
23.8
50.80
KC3.1
1 2/19/07
44.34
80
11.58
23.0
69.50
KC3.1
1 2/20/07
62.07
50
14.12
48.1
155.00
KC3.1
12/22/07
56.56
33
47.76
35.9
320.00
KC3.1
12/23/07
35.42
41
3.91
27.8
42.10
KC3.1
1 2/28/07
24.11
15
23.49
14.8
108.00
KC3.1
1 2/30/07
18.30
17
2.95
12.1
22.60
KC3.2
1 2/02/07
61.71
90
21.30
34.2
234.00
KC3.2
1 2/03/07
79.96
96
10.31
64.3
155.60
KC3.2
1 2/04/07
72.01
90
14.02
61.9
173.00
KC3.2
1 2/05/07
67.83
13
6.03
59.7
81.20
KC3.2
12/11/07
27.58
10
6.89
8.7
34.10
KC3.2
1 2/15/07
25.64
33
6.85
12.3
35.90
KC3.2
1 2/18/07
37.24
19
10.64
9.0
45.90
KC3.2
1 2/19/07
47.14
69
13.79
28.5
71.40
KC3.2
1 2/20/07
73.79
47
70.18
49.3
486.60
KC3.2
12/22/07
47.76
32
4.59
39.6
56.70
KC3.2
12/23/07
36.85
44
32.22
25.3
244.20
KC3.2
12/27/07
18.02
31
4.93
11.7
38.10
KC3.2
1 2/28/07
30.73
46
58.83
15.1
409.80
KC3.3
12/01/07
28.95
4
3.00
26.4
32.60
KC3.3
1 2/02/07
57.90
94
11.25
33.4
80.10
F-672

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
KC3.3
1 2/03/07
79.01
96
13.15
63.6
195.90
KC3.3
1 2/04/07
76.70
95
12.46
67.2
177.10
KC3.3
1 2/05/07
73.48
16
7.03
64.7
92.60
KC3.3
1 2/1 7/07
42.43
32
19.49
24.0
117.80
KC3.3
1 2/18/07
38.96
63
5.26
31.3
62.20
KC3.3
1 2/19/07
30.89
74
8.10
24.1
82.90
KC3.3
1 2/20/07
35.19
46
19.05
20.2
67.40
KC3.3
12/22/07
38.91
52
8.22
26.5
52.40
KC3.3
12/23/07
32.70
49
8.90
23.9
87.50
KC3.3
1 2/26/07
14.78
18
7.28
10.9
42.70
KC3.3
12/27/07
18.29
29
8.29
10.1
58.40
KC3.3
1 2/28/07
19.83
36
2.11
17.0
27.80
KC3.3
1 2/30/07
19.95
17
12.03
11.0
65.30
KC3.4
12/01/07
33.13
4
7.20
27.0
43.50
KC3.4
1 2/02/07
57.31
93
9.50
30.5
69.80
KC3.4
1 2/03/07
73.54
96
4.28
65.8
98.30
KC3.4
1 2/04/07
72.74
95
19.51
59.9
224.60
KC3.4
1 2/05/07
65.87
14
3.15
59.0
72.50
KC3.4
1 2/15/07
27.63
30
6.57
12.7
36.10
KC3.4
1 2/18/07
46.59
36
4.85
37.6
53.90
KC3.4
1 2/19/07
46.89
35
5.90
31.2
54.20
KC3.4
1 2/20/07
64.42
47
15.72
45.5
165.50
KC3.4
12/22/07
44.73
48
16.52
28.2
144.10
KC3.4
12/23/07
35.52
46
5.29
25.8
55.60
KC3.4
1 2/26/07
17.23
18
12.00
12.3
64.80
KC3.4
12/27/07
21.34
17
2.45
17.8
28.20
KC3.4
1 2/28/07
22.13
28
5.23
19.1
45.10
KC3.4
1 2/30/07
15.58
15
6.27
0.4
23.10
KC3.Pond
01/04/08
25.13
4
16.92
16.4
50.50
KC3.Pond
01/08/08
33.90
4
2.34
32.6
37.40
KC3.Pond
01/09/08
38.27
21
16.37
11.1
71.00
KC3.Pond
01/10/08
42.09
17
13.59
10.4
79.80
KC3.Pond
01/11/08
59.64
20
11.07
34.3
81.00
KC3.Pond
01/1 2/08
63.99
20
14.27
50.1
119.10
KC3.Pond
01/14/08
44.46
24
18.82
34.5
130.90
NC.Road
09/16/08
167.00

93.00

339.00
NC.Road
11/04/08
43.00

27.00

108.00
NC.Road
11/14/08
50.00

19.00

98.00
NC.Road
11/25/08
40.00

22.00

80.00
NC.Road
11/30/08
37.00

8.00

48.00
NC.Road
1 2/25/08
38.00

22.00

116.00
NC.Road
01/06/09
11.00

12.00

46.00
NCR.1
06/27/06
109.00
22



F-673

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
NCR.1
08/09/06
24.00
2



NCR.1
08/11/06
24.00
13



NCR.1
08/1 2/06
40.00
9



NCR.1
08/30/06
43.00
11



NCR.1
08/31/06
38.00
10



NCR.1
09/04/06
40.00
3



NCR.1
09/07/06
16.00
9



NCR.1
09/1 3/06
9.00
7



NCR.1
09/23/06
77.00
4



NCR.1
09/24/06
18.00
4



NCR.1
10/05/06
15.00
11



NCR.2
07/1 3/06
90.00
4



NCR.2
09/10/06
15.00
1



NCR.2
09/1 3/06
44.00
4



NY
10/02/08
549.39
22
355.41
6.5
1000.90
NY
10/03/08
284.35
57
296.81
48.7
990.70
NY
10/04/08
125.88
45
75.19
44.2
444.60
NY
10/06/08
116.67
19
41.20
68.8
237.20
NY
10/07/08
70.09
54
49.91
29.7
380.10
NY
10/08/08
72.24
47
29.18
33.6
136.60
NY
10/09/08
86.52
40
90.91
31.1
631.40
NY
10/10/08
54.39
27
22.31
25.8
128.70
NY
10/11/08
66.01
35
20.82
34.0
114.10
NY
10/1 2/08
72.37
33
24.00
12.4
147.40
NY
10/1 3/08
66.74
29
18.95
43.3
130.00
NY
10/14/08
68.86
30
19.40
37.1
120.80
NY
10/15/08
108.26
30
47.23
56.7
305.40
NY
10/16/08
144.52
13
18.79
129.1
187.20
NY
10/1 7/08
134.23
51
55.39
64.1
317.70
NY
10/18/08
114.39
22
5.66
107.4
128.30
NY
10/19/08
98.00
27
31.52
40.1
134.30
NY
10/20/08
43.40
25
23.79
8.9
87.20
NY
10/21/08
44.00
49
12.59
27.2
74.40
NY
10/22/08
27.10
26
4.60
21.9
37.30
NY
10/23/08
55.23
27
14.79
33.1
80.50
NY
10/24/08
58.20
34
23.51
32.4
104.10
NY
10/25/08
101.61
45
37.23
47.0
221.30
NY
10/26/08
74.97
40
20.80
9.3
140.40
NY
10/27/08
65.89
9
9.01
52.0
78.40
NY
10/28/08
172.13
16
58.35
83.0
267.40
NY
10/29/08
105.82
42
28.29
54.6
169.10
NY
10/30/08
89.83
43
22.52
42.4
181.00
NY
10/31/08
98.25
30
16.71
72.4
156.40
F-674

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
NY
11/01/08
140.62
32
54.77
76.4
235.10
NY
11/02/08
97.57
29
31.50
64.7
154.00
NY
11/03/08
156.24
37
23.02
110.0
187.70
NY
11/04/08
197.48
20
13.03
175.9
231.90
NY
11/05/08
158.57
29
50.11
82.4
247.10
NY
11/06/08
149.49
35
69.40
24.0
232.30
NY
11/07/08
65.13
31
36.53
32.4
197.10
NY
11/08/08
41.00
1

41.0
41.00
NY
11/19/08
60.60
1

60.6
60.60
NY
11/24/08
14.50
1

14.5
14.50
NY
11/30/08
14.10
1

14.1
14.10
NY
12/01/08
113.47
6
40.20
62.4
150.50
NY
1 2/03/08
6.18
21
0.34
6.0
7.00
NY
1 2/04/08
6.13
96
0.05
6.1
6.20
NY
1 2/05/08
5.87
96
0.30
5.5
6.20
NY
1 2/06/08
5.56
96
0.08
5.5
5.70
NY
1 2/07/08
5.64
46
0.07
5.5
5.70
NY
03/27/09
221.63
4
329.18
4.1
707.70
NY
03/28/09
5.47
6
0.38
5.0
5.90
NY
03/29/09
6.67
7
1.73
5.4
10.50
NY
03/30/09
117.50
37
37.20
3.7
201.90
NY
03/31/09
106.80
49
67.90
46.2
535.30
NY
04/01/09
99.21
57
41.78
26.1
179.60
NY
04/02/09
80.11
37
20.53
39.0
125.10
NY
04/03/09
176.99
61
139.45
28.2
746.30
NY
04/04/09
168.90
28
145.54
58.7
801.90
NY
04/05/09
124.28
27
44.63
14.3
228.80
NY
04/06/09
108.31
43
25.24
34.3
153.90
NY
04/07/09
149.49
66
63.87
26.0
461.90
NY
04/08/09
137.47
73
30.73
80.2
264.70
NY
04/09/09
131.50
57
48.18
60.2
271.70
NY
04/10/09
123.65
46
45.55
59.5
272.30
NY
04/11/09
100.81
43
28.55
53.0
165.50
NY
04/1 2/09
140.72
45
114.22
60.0
684.50
NY
04/1 3/09
97.51
42
28.91
57.8
213.50
NY
04/14/09
120.48
31
63.75
76.4
439.90
NY
04/15/09
94.50
41
29.96
32.8
161.10
NY
04/16/09
128.68
56
38.58
68.9
201.00
NY
04/1 7/09
106.12
43
25.83
64.9
160.10
NY
04/18/09
103.17
43
24.91
53.0
170.60
NY
04/19/09
134.96
43
58.22
71.3
462.60
NY
04/20/09
132.14
36
33.77
57.3
212.40
NY
04/21/09
142.88
40
54.07
56.7
317.20
F-675

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
NY
04/22/09
117.09
52
30.56
43.0
248.40
NY
04/23/09
156.47
48
132.41
46.9
834.20
NY
04/24/09
78.60
48
21.15
28.4
120.70
NY
04/25/09
82.57
46
33.72
24.8
180.40
NY
04/26/09
89.65
47
38.61
27.3
187.30
NY
04/27/09
101.46
47
111.86
28.9
653.00
NY
04/28/09
128.52
70
73.28
30.2
550.20
NY
04/29/09
148.60
40
24.02
99.3
186.60
NY
04/30/09
168.11
42
32.98
109.0
235.10
NY
05/01/09
178.51
62
75.97
2.3
296.30
NY
05/02/09
86.82
43
27.42
46.5
151.40
NY
05/03/09
72.17
36
17.66
43.2
96.90
NY
05/04/09
91.15
39
24.61
49.8
148.10
NY
05/05/09
117.05
38
15.00
90.8
151.60
NY
05/06/09
122.10
34
25.87
42.6
187.90
NY
05/07/09
147.89
48
44.30
43.0
201.30
NY
05/08/09
102.75
56
36.30
30.4
239.10
NY
05/09/09
103.94
39
31.83
24.2
172.00
NY
05/10/09
107.39
31
35.05
57.4
209.30
NY
05/11/09
102.58
31
18.11
42.7
159.40
NY
05/1 2/09
110.12
23
43.67
44.2
234.80
NY
05/1 3/09
93.19
31
74.59
36.1
352.60
NY
05/14/09
70.71
29
25.00
10.3
111.00
NY
05/15/09
59.49
28
17.92
16.3
89.90
NY
05/16/09
69.64
30
17.78
28.7
104.20
NY
05/1 7/09
72.65
21
11.43
57.6
102.30
NY
05/18/09
59.38
24
11.52
48.9
99.30
NY
05/19/09
55.66
27
18.55
18.5
117.40
NY
05/20/09
60.03
26
12.99
50.1
114.00
NY
05/21/09
58.20
24
10.25
24.5
77.30
NY
05/22/09
75.12
26
14.88
48.8
121.60
NY
05/23/09
96.24
23
32.83
73.4
199.40
NY
05/24/09
63.04
30
83.03
9.8
399.00
NY
05/25/09
30.60
24
5.48
25.0
48.90
NY
05/26/09
72.14
45
49.37
19.6
212.70
NY
05/27/09
136.12
27
65.84
31.8
287.40
NY
05/28/09
137.87
61
53.67
71.2
403.30
NY
05/29/09
72.71
17
22.62
39.9
117.30
NY
05/30/09
99.72
29
21.86
51.3
150.40
NY
05/31/09
113.06
23
25.01
92.0
193.70
NY
06/01/09
123.80
23
20.51
104.0
178.10
NY
06/02/09
130.36
18
7.81
119.7
143.80
NY
06/03/09
159.59
21
10.62
143.0
177.60
F-676

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
NY
06/04/09
1 58.59
20
11.06
134.4
179.10
NY
06/05/09
155.24
16
29.73
128.8
226.10
NY
06/06/09
55.78
19
55.32
7.4
277.50
NY
06/07/09
44.14
21
7.18
32.7
57.50
NY
06/08/09
45.73
18
8.16
35.2
61.10
NY
06/09/09
65.99
31
31.44
11.3
127.80
NY
06/10/09
58.14
27
30.81
8.9
149.50
NY
06/11/09
89.77
23
108.57
9.3
397.10
NY
06/1 2/09
130.66
50
74.85
30.4
352.90
NY
06/1 3/09
114.91
31
62.01
31.7
247.20
NY
06/14/09
94.03
25
44.99
13.0
247.30
NY
06/15/09
63.40
24
19.43
40.6
123.50
NY
06/16/09
100.77
18
80.64
65.8
420.30
NY
06/1 7/09
95.04
23
40.62
58.7
219.30
NY
06/18/09
139.73
35
50.68
48.4
314.70
NY
06/19/09
58.05
22
26.03
41.3
170.70
NY
06/20/09
116.91
62
71.35
21.0
518.50
NY
06/21/09
122.89
34
44.41
64.2
284.80
NY
06/22/09
133.58
31
129.56
5.5
720.90
NY
06/23/09
77.75
22
49.56
30.2
261.50
NY
06/24/09
78.60
14
102.44
33.0
390.40
NY
06/25/09
135.54
36
159.63
5.0
645.90
NY
06/26/09
125.16
78
81.66
24.8
411.50
NY
06/27/09
141.37
34
95.46
30.2
470.00
NY
06/28/09
118.45
40
42.20
26.2
212.80
NY
06/29/09
132.11
49
106.34
50.7
758.70
NY
06/30/09
118.30
72
85.55
34.4
636.30
NY
07/01/09
116.32
32
65.69
42.9
414.10
NY
07/02/09
93.07
40
43.18
41.8
273.70
NY
07/03/09
182.25
47
120.64
49.1
586.80
NY
07/04/09
103.57
3
79.07
12.7
156.70
NY
07/05/09
80.50
2
0.99
79.8
81.20
NY
07/06/09
2.50
1

2.5
2.50
NY
07/07/09
48.87
7
13.83
35.5
77.80
NY
07/08/09
63.93
28
42.34
1.6
146.90
NY
07/09/09
129.25
35
68.64
17.7
345.70
NY
07/10/09
59.30
23
33.81
30.5
181.70
NY
07/11/09
159.50
21
179.43
29.3
659.30
NY
07/1 2/09
103.27
42
69.62
9.5
438.60
NY
07/1 3/09
103.39
22
28.03
54.4
150.50
NY
07/14/09
91.54
23
28.46
71.7
203.40
NY
07/15/09
100.33
27
17.79
61.2
138.50
NY
07/16/09
106.37
24
46.87
9.6
167.20
F-677

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
NY
07/1 7/09
77.07
25
44.96
9.8
183.10
NY
07/18/09
146.35
42
97.76
17.3
672.50
NY
07/19/09
72.50
26
34.21
18.0
145.40
NY
07/20/09
91.77
23
100.79
43.2
404.10
NY
07/21/09
75.29
41
28.10
21.6
129.10
NY
07/22/09
98.28
23
30.13
40.5
147.70
NY
07/23/09
157.89
59
62.44
64.7
456.00
NY
07/24/09
176.83
52
151.74
3.3
929.50
NY
07/25/09
89.27
30
42.70
22.5
172.80
NY
07/26/09
130.73
29
81.50
22.8
400.80
NY
07/27/09
89.15
28
30.43
20.1
146.10
NY
07/28/09
51.11
19
11.81
38.3
81.70
NY
07/29/09
73.76
34
33.92
32.6
136.90
NY
07/30/09
73.96
14
14.97
33.7
100.30
NY
07/31/09
63.61
23
11.08
44.4
100.00
NY
08/01/09
77.11
22
55.14
32.5
285.40
NY
08/02/09
137.89
27
39.84
78.4
216.80
NY
08/03/09
96.92
24
14.79
71.1
142.50
NY
08/04/09
110.86
22
34.18
68.6
236.30
NY
08/05/09
139.05
34
26.06
88.3
186.00
NY
08/06/09
117.59
22
18.56
79.8
150.10
NY
08/07/09
121.75
23
60.67
17.8
276.00
NY
08/08/09
58.34
23
18.31
24.2
108.30
NY
08/09/09
103.91
24
37.76
17.5
210.50
NY
08/10/09
118.42
32
45.41
25.2
195.80
NY
08/11/09
139.69
39
39.57
11.5
181.30
NY
08/1 2/09
70.91
31
20.07
28.1
120.80
NY
08/1 3/09
58.63
24
13.91
40.8
101.70
NY
08/14/09
66.34
24
24.97
45.5
153.90
NY
08/15/09
62.88
22
18.18
45.1
109.60
NY
08/16/09
74.36
22
34.89
48.0
182.90
NY
08/1 7/09
56.83
23
44.17
32.9
252.90
NY
08/18/09
82.60
47
49.00
40.8
235.10
NY
08/19/09
97.14
34
24.42
23.0
154.90
NY
08/20/09
70.35
36
30.83
33.4
152.80
NY
08/21/09
113.87
37
82.97
37.8
509.20
NY
08/22/09
59.63
30
17.50
26.4
89.20
NY
08/23/09
58.62
25
53.75
27.2
310.60
NY
08/24/09
39.38
25
14.81
18.6
72.90
NY
08/25/09
72.09
29
104.44
6.5
602.80
NY
08/26/09
101.96
42
47.15
26.3
299.30
NY
08/27/09
68.44
29
28.15
20.1
114.20
NY
08/28/09
28.78
23
7.98
13.9
55.90
F-678

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
NY
08/29/09
149.16
68
1 22.88
30.3
763.90
NY
08/30/09
106.36
43
60.93
44.3
434.20
NY
08/31/09
100.33
34
38.56
41.0
152.00
NY
09/01/09
55.76
22
27.93
32.1
147.10
NY
09/02/09
84.87
3
55.17
37.0
145.20
NY
09/03/09
122.70
1

122.7
122.70
NY
09/04/09
77.20
27
64.45
37.4
380.60
NY
09/05/09
49.75
17
11.37
37.6
84.00
NY
09/06/09
71.76
20
53.43
20.3
242.80
NY
09/07/09
49.48
21
16.50
28.3
80.60
NY
09/08/09
44.21
21
13.17
31.1
72.00
NY
09/09/09
63.87
21
29.02
37.8
178.80
NY
09/10/09
66.25
26
32.33
13.0
112.60
NY
09/11/09
25.66
18
6.41
16.9
41.50
NY
09/1 2/09
30.93
18
6.84
16.1
47.60
NY
09/1 3/09
39.38
25
26.81
19.8
133.20
NY
09/14/09
45.76
22
30.97
20.8
127.40
NY
09/15/09
42.51
20
55.24
15.4
256.90
NY
09/16/09
26.84
14
9.85
18.8
58.60
Red. East
09/29/06
8.80
2
0.14
8.7
8.90
Red. East
10/03/06
7.97
3
1.70
6.3
9.70
Red. East
10/05/06
107.80
1

107.8
107.80
Red. East
10/06/06
643.27
13
383.66
3.7
1000.90
Red. East
10/09/06
672.65
8
134.14
486.2
872.60
Red. East
10/1 2/06
591.07
28
230.01
263.5
974.40
Red. East
10/1 3/06
185.64
9
15.76
161.7
205.80
Red. East
10/16/06
492.94
18
238.63
135.6
813.30
Red. East
10/1 7/06
216.13
10
42.98
151.0
270.60
Red. East
10/20/06
467.22
23
247.36
50.0
953.40
Red. East
10/23/06
414.33
23
213.66
134.2
738.70
Red. East
10/25/06
370.90
17
234.73
156.7
861.90
Red. East
10/26/06
500.63
12
168.73
288.8
747.40
Red. East
10/27/06
451.50
26
223.19
152.5
896.80
Red. East
11/02/06
499.65
11
188.46
147.1
750.20
Red. East
11/03/06
346.98
22
233.94
23.4
834.20
Red. East
11/04/06
382.64
55
256.64
9.9
998.70
Red. East
11/05/06
397.95
85
247.99
25.9
992.90
Red. East
11/06/06
433.59
78
278.97
39.3
933.20
Red. East
11/07/06
350.57
82
228.97
28.3
936.00
Red. East
11/08/06
225.90
4
100.31
136.4
319.70
Red. East
11/09/06
415.03
4
207.73
161.2
657.60
Red. East
11/10/06
319.40
57
122.63
80.1
685.30
Red. East
11/11/06
244.83
7
107.41
108.9
423.60
F-679

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
Red.East
11/1 2/06
280.36
20
106.10
141.6
535.00
Red. East
11/1 3/06
291.53
32
126.68
125.7
616.00
Red. East
11/14/06
181.80
3
95.16
76.0
260.40
Red. East
11/15/06
371.78
5
187.46
190.1
671.60
Red. East
11/16/06
305.72
37
149.14
117.1
659.80
Red. East
11/1 7/06
286.41
16
142.14
46.7
658.50
Red. East
11/20/06
353.34
27
197.62
6.6
767.70
Red. East
11/21/06
386.13
38
198.22
114.2
791.80
Red. East
11/22/06
287.68
42
74.74
156.7
534.80
Red. East
11/23/06
255.56
12
38.64
204.8
333.10
Red. East
11/24/06
203.38
8
74.25
23.4
262.90
Red. East
11/27/06
199.97
15
17.49
170.1
233.70
Red. East
12/01/06
48.76
7
88.10
2.7
235.30
Red. East
1 2/04/06
130.84
17
39.26
5.3
179.60
Red. East
12/11/06
404.74
54
227.33
4.0
944.70
Red. East
1 2/1 2/06
365.54
47
186.67
25.3
933.50
Red. East
1 2/1 3/06
317.69
49
102.94
14.7
613.60
Red. East
1 2/14/06
386.83
43
189.00
134.0
826.90
Red. East
1 2/15/06
305.47
85
166.68
12.0
887.10
Red. East
1 2/16/06
93.74
5
82.94
3.7
165.50
Red. East
1 2/20/06
247.40
12
84.50
79.4
371.40
Red. East
12/21/06
274.71
30
168.64
4.2
762.00
Red. East
12/22/06
298.11
42
152.83
4.0
678.80
Red. East
12/23/06
288.15
44
192.11
4.0
775.60
Red. East
1 2/25/06
262.03
24
182.43
4.0
711.50
Red. East
1 2/26/06
216.92
32
127.10
46.6
574.80
Red. East
12/27/06
166.46
36
74.54
73.6
349.30
Red. East
1 2/28/06
161.24
44
79.37
3.7
314.10
Red. East
1 2/29/06
188.11
19
89.00
2.1
374.90
Red. East
1 2/30/06
224.81
19
149.04
21.6
689.10
Red. East
01/01/07
130.73
18
90.01
3.2
345.30
Red. East
01/02/07
318.92
62
207.15
76.8
918.40
Red. East
01/03/07
245.85
85
177.12
39.2
821.00
Red. East
01/04/07
192.83
48
113.76
48.6
620.30
Red. East
01/05/07
26.93
3
41.38
2.0
74.70
Red. East
01/06/07
278.68
65
212.45
7.9
883.30
Red. East
01/07/07
201.48
27
81.68
3.0
365.50
Red. East
01/10/07
228.73
27
160.69
3.4
684.30
Red. East
01/19/07
112.37
6
39.90
58.7
159.50
Red. East
01/20/07
204.77
3
24.07
186.0
231.90
Red. East
02/05/07
139.40
8
61.13
7.8
227.10
Red. East
02/1 2/07
175.73
7
59.61
49.3
236.90
Red. East
02/15/07
116.60
7
102.94
5.6
205.60
F-680

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
Red.East
02/19/07
225.74
22
104.95
5.5
446.70
Red. East
02/20/07
300.38
32
142.45
5.5
538.30
Red. East
02/21/07
182.20
10
117.27
5.7
383.40
Red. East
02/22/07
287.59
35
129.25
35.4
562.50
Red. East
02/26/07
229.29
25
133.55
5.3
448.10
Red. East
02/27/07
148.03
20
70.43
9.0
268.40
Red. East
03/02/07
353.01
29
200.41
6.5
711.70
Red. East
03/03/07
292.11
21
232.73
76.5
783.20
Red. East
03/06/07
350.82
26
240.36
8.5
831.70
Red. East
03/07/07
410.84
28
241.15
49.4
816.50
Red. East
03/08/07
580.80
36
284.04
86.0
979.20
Red. East
03/09/07
377.84
28
186.14
86.1
750.40
Red. East
03/10/07
416.85
32
226.31
65.1
835.50
Red. East
03/11/07
388.19
12
354.55
6.5
886.50
Red. East
03/1 2/07
289.99
29
253.74
6.9
705.90
Red. East
03/1 3/07
202.24
21
137.74
42.9
481.50
Red. East
03/15/07
214.87
19
153.83
43.0
714.20
Red. East
03/20/07
159.63
19
157.04
6.5
514.00
Red. East
03/23/07
90.61
10
18.57
68.0
122.10
Red. East
03/24/07
65.93
20
10.07
49.2
90.20
Red. East
03/29/07
55.09
11
15.39
40.9
99.00
Red. East
03/30/07
16.23
4
0.05
16.2
16.30
Red. East
04/11/07
35.13
3
22.86
CO
CO
49.90
Red. East
04/1 2/07
62.05
16
33.73
7.0
118.70
Red. East
04/19/07
81.97
26
51.81
5.2
151.30
Red. East
05/09/07
5.35
2
0.07
5.3
5.40
Red. East
05/24/07
39.50
22
25.78
5.5
99.20
Red. East
06/01/07
41.90
17
60.99
4.2
257.30
Red. East
07/22/07
7.65
6
2.00
6.2
11.40
Red. East
07/23/07
126.93
13
89.38
4.5
247.20
Red. East
08/15/07
6.20
4
2.36
3.7
9.30
Red. East
08/21/07
52.80
18
49.57
CO
CO
143.70
Red. East
08/22/07
45.26
19
74.44
10.8
334.70
Red. East
08/23/07
12.82
18
5.70
4.7
26.30
Red. East
09/05/07
59.88
12
51.50
CO
CO
151.60
Red. East
09/07/07
23.44
9
30.97
7.0
104.10
Red. East
09/1 7/07
8.30
1

8.3
8.30
Red. East
09/21/07
12.95
8
8.22
4.2
30.20
Red. East
09/24/07
7.31
7
0.75
6.0
8.10
Red. East
10/01/07
94.13
19
34.43
16.2
146.00
Red. East
10/03/07
108.37
10
49.47
15.5
201.90
Red. East
10/04/07
82.16
14
35.19
27.7
141.40
Red. East
10/1 2/07
59.27
9
31.34
7.0
108.10
F-681

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
Red. East
10/15/07
83 99
18
80.04
9.9
355.20
Red. East
10/16/07
72.59
17
94.50
14.9
344.40
Red. East
10/1 7/07
37.40
2
39.74
9.3
65.50
Red. East
10/18/07
126.28
14
32.19
60.5
168.40
Red. East
10/19/07
172.88
10
77.67
62.4
294.30
Red. East
10/23/07
219.51
29
106.66
61.1
489.10
Red. East
10/24/07
117.10
12
50.00
35.0
205.80
Red. East
10/25/07
166.05
19
70.58
57.6
368.60
Red. East
10/29/07
146.54
13
92.63
14.0
326.20
Red. East
11/09/07
119.80
14
92.84
7.7
243.10
Red. East
11/12/07
208.40
21
74.12
19.7
378.60
Red. East
11/15/07
184.81
22
82.59
8.5
301.70
Red. East
11/16/07
169.37
13
87.37
13.8
266.30
Red. East
11/19/07
196.04
23
60.95
13.8
283.70
Red. East
11/20/07
127.08
17
93.84
8.6
262.60
Red. East
11/21/07
167.84
18
57.49
11.1
268.70
Red. East
1 2/03/07
240.05
80
72.18
105.6
371.70
Red. East
1 2/04/07
134.09
67
53.20
79.0
403.50
Red. East
1 2/05/07
105.94
21
31.51
10.3
161.00
Red. East
1 2/10/07
113.61
14
66.79
11.0
230.90
Red. East
1 2/14/07
142.12
22
54.66
10.7
283.10
Red. East
1 2/1 7/07
134.44
5
75.13
11.1
215.90
Red. East
1 2/18/07
201.22
13
147.11
11.0
503.30
Red. East
1 2/19/07
207.87
26
89.73
75.9
448.50
Red. East
1 2/20/07
202.78
28
100.66
29.3
376.10
Red. East
12/23/07
146.56
10
77.63
5.6
247.80
Red. East
1 2/24/07
197.26
7
102.91
8.1
345.40
Red. East
1 2/26/07
168.96
8
77.83
97.7
346.00
Red. East
1 2/28/07
157.35
13
98.38
12.8
408.10
Red. East
12/31/07
169.43
7
178.03
69.1
567.60
Red. East
01/03/08
100.01
10
19.88
65.9
127.30
Red. East
01/05/08
109.26
8
44.74
8.9
145.60
Red. East
01/08/08
195.03
19
103.33
48.9
541.70
Red. East
01/09/08
283.64
17
260.56
1.6
946.70
Red. East
01/10/08
208.10
25
115.18
11.9
425.80
Red. East
01/11/08
280.57
6
177.48
11.6
546.20
Red. East
01/17/08
222.32
18
75.83
115.6
396.70
Red. East
01/18/08
207.85
10
63.84
106.4
315.50
Red. East
01/22/08
237.82
10
108.10
121.5
441.50
Red. East
01/23/08
148.18
17
53.43
58.8
259.60
Red. East
01/29/08
471.08
13
173.51
331.1
904.10
Red. East
01/31/08
422.59
15
108.66
295.7
696.10
Red. East
02/01/08
357.53
8
237.91
77.6
688.50
F-682

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
Red. East
02/05/08
95.50
5
49.17
46.2
173.80
Red. East
02/07/08
218.31
7
228.09
75.5
597.10
Red. East
02/11/08
653.10
1

653.1
653.10
Red. East
02/1 2/08
71.42
15
28.48
11.1
116.00
Red. East
02/1 3/08
105.05
6
23.03
81.3
131.10
Red. East
02/20/08
116.03
4
47.68
78.0
182.00
Red. East
03/1 7/08
60.25
6
8.22
46.9
69.20
Red. East
03/18/08
59.51
9
29.21
22.9
109.40
Red. East
03/20/08
50.53
4
3.67
46.5
55.10
Red. East
04/01/08
27.40
4
24.64
12.7
64.10
Red. East
04/02/08
63.44
20
18.91
13.6
95.50
Red. East
04/04/08
93.41
12
37.11
43.4
158.60
Red. East
04/1 7/08
91.91
11
134.76
25.8
473.60
Red. East
04/22/08
63.66
10
12.43
44.1
90.30
Red. East
04/23/08
205.01
17
147.33
83.5
686.50
Red. East
04/24/08
71.39
7
19.80
35.2
94.10
Red. West
11/05/06
242.50
21
19.03
186.3
300.70
Red. West
11/06/06
334.29
41
180.23
15.5
614.10
Red. West
11/07/06
190.49
53
59.47
110.0
290.10
Red. West
11/08/06
104.84
11
36.80
50.5
173.50
Red. West
11/10/06
134.58
22
72.28
57.7
246.50
Red. West
11/11/06
172.90
6
30.76
123.5
200.30
Red. West
11/12/06
72.83
8
36.94
21.5
111.80
Red. West
11/13/06
108.93
9
80.09
29.3
202.30
Red. West
11/14/06
118.25
14
54.15
3.4
167.80
Red. West
11/16/06
140.67
9
9.52
126.4
153.00
Red. West
11/20/06
131.53
16
62.57
3.6
218.40
Red. West
11/21/06
182.55
22
33.67
121.7
228.30
Red. West
11/22/06
162.71
13
22.86
122.0
185.80
Red. West
11/24/06
91.17
9
18.44
61.9
104.50
Red. West
1 2/05/06
40.64
17
10.04
3.3
46.90
Red. West
12/11/06
275.92
17
88.90
113.8
405.20
Red. West
1 2/1 2/06
240.80
7
72.44
146.7
307.90
Red. West
1 2/1 3/06
182.91
19
71.58
111.5
317.80
Red. West
1 2/14/06
341.21
7
90.36
257.2
491.30
Red. West
1 2/15/06
193.71
30
55.75
110.7
364.10
Red. West
1 2/16/06
166.86
15
116.56
5.7
400.90
Red. West
12/21/06
138.85
8
139.06
9.8
317.90
Red. West
12/22/06
149.15
20
64.14
38.0
284.20
Red. West
1 2/26/06
161.48
16
60.78
47.2
246.10
Red. West
12/27/06
160.95
34
42.30
14.7
235.80
Red. West
01/03/07
153.87
16
61.66
50.9
220.80
Red. West
01/06/07
193.78
8
23.68
164.1
232.00
F-683

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
Red. West
01/07/07
1 58.56
11
13.36
139.5
186.10
Red. West
01/22/07
123.29
20
20.38
100.6
176.10
Red. West
02/19/07
77.19
7
29.14
44.0
109.20
Red. West
02/20/07
122.25
4
8.34
110.0
128.50
Red. West
02/28/07
69.02
5
5.68
62.5
76.50
Red. West
03/05/07
50.33
6
7.00
41.1
58.30
Red. West
03/1 2/07
40.08
12
4.66
29.5
47.90
Red. West
03/21/07
41.22
6
6.22
30.2
47.80
Red. West
03/27/07
38.30
13
4.57
29.7
45.10
Red. West
04/1 2/07
17.00
5
1.37
15.2
18.80
Red. West
04/20/07
34.34
5
4.80
26.9
38.90
Red. West
10/03/07
20.37
9
9.08
7.9
33.10
Red. West
10/1 2/07
11.92
6
2.16
8.9
15.50
Red. West
10/26/07
31.33
11
6.17
22.3
43.10
Red. West
10/30/07
21.22
12
5.83
14.3
34.10
Red. West
11/14/07
23.80
9
6.58
16.7
39.30
Red. West
11/16/07
60.08
4
6.44
53.4
68.50
Red. West
1 2/03/07
70.67
50
15.67
4.0
85.50
Red. West
1 2/04/07
57.64
16
35.89
36.7
183.10
Red. West
12/23/07
67.20
7
9.37
51.2
76.20
Red. West
12/31/07
33.93
8
18.67
1.6
70.10
Red. West
01/03/08
56.78
6
10.43
46.7
76.30
Red. West
01/14/08
92.54
9
7.71
82.7
105.50
Red. West
02/01/08
37.55
10
10.43
30.5
60.80
Red. West
02/1 2/08
30.96
10
14.15
23.0
70.10
Red. West
03/20/08
16.23
8
4.70
12.9
26.60
Red. West
04/01/08
20.48
14
9.97
1.4
43.30
Red. West
04/1 7/08
20.43
3
11.96
12.6
34.20
Red. West
04/23/08
12.86
8
3.83
7.8
19.10
SEAAIR
04/01/05
131.63
87
19.56
56.4
173.66
SEAAIR
04/03/05
128.34
44
32.11
58.1
209.22
SEAAIR
04/11/05
82.85
40
10.03
40.8
94.46
SEAAIR
04/1 2/05
78.13
36
10.80
33.3
96.30
SEAAIR
04/16/05
155.92
22
13.98
133.6
185.00
SEAAIR
04/18/05
116.07
44
7.00
95.9
133.33
SEAAIR
04/19/05
105.75
44
5.56
101.2
124.52
SEAAIR
04/20/05
96.99
25
1.35
95.8
100.76
SEAAIR
04/26/05
34.84
24
11.99
24.5
72.06
STCLLR*
224/1
161.76
12
71.22
56.9
257.40
STCLLR*
226/1
65.76
7
23.65
38.4
96.40
STCLLR*
301/1
44.94
15
16.66
19.3
65.70
STCLLR*
302/1
29.17
3
9.26
18.5
35.10
STCLLR*
306/1
11.22
5
4.15
6.8
16.30
F-684

-------
Appendix F: Turbidity Report Tables
Listing 2: Daily values (NTU) for turbidity of effluent from passive treatment
Site/system

Daily value
Summary statistics of reported measurements used to
calculate daily value

Date
(arithmetic
average)
Number
Standard
deviation
Minimum
Maximum
STCLLR*
309/1
55.46
11
25.47
18.7
85.50
STCLLR*
311/1
59.47
18
17.61
28.2
102.10
STCLLR*
312/1
56.68
18
11.88
42.9
95.60
STCLLR*
320/1
71.51
17
36.58
7.8
146.90
STCLLR*
322/1
41.55
11
12.85
22.3
64.80
STCLLR*
324/1
73.57
26
24.75
9.3
132.80
STCLLR*
327/1
59.06
12
21.95
17.9
88.90
STCLLR*
330/1
50.26
10
38.33
7.5
120.40
STCLLR*
402/1
69.91
10
64.15
4.9
238.80
STCLLR*
416/1
55.41
10
37.53
4.7
126.10
STCLLR*
503/1
17.77
3
8.47
8.2
24.30
STCLLR*
521/1
114.31
8
93.01
7.9
293.90
'Dates are as reported.
F-685

-------
Appendix G
Lognormal Distribution Used for Site-Specific, Long-Term
Averages and Variability Factors

-------
Appendix G: Lognormal Distribution
Introduction
From its past experience with effluent data, the U.S. Environmental Protection Agency (EPA)
considers the lognormal distribution to be appropriate for statistically modeling daily values of
turbidity measurements to obtain the daily maximum limitation. This appendix describes EPA's
use of the lognormal distribution in estimating a long-term average and variability factor for each
system-specific data set described in Chapter 6. EPA then used the system-specific estimates to
develop an overall long-term average and variability factor for the limitation calculation, also as
described in Chapter 6.
The sections below describe the lognormal distribution and parameter estimates; long-term average
calculations; variability factor calculations; and an example based on data from system KC.Pond.
Overview of the Lognormal Distribution
The lognormal distribution is the most commonly used probability density model for environmental
contaminant data (Gilbert 1987). EPA's experience has shown that the daily pollutant
concentrations in effluent can be modeled by a lognormal distribution for a wide range of industrial
categories and pollutants. For example, histograms of daily pollutant concentration data associated
with effluent discharges frequently exhibit positive skewness (i.e., most values tending to occur at
the lower limit of the data range) and long tails to the right (i.e., gradually fewer values at the
higher end). Such histograms resemble the shape of the probability curve of a lognormal
distribution. Scientists have used the lognormal distribution to model environmental data, including
effluent data, primarily because it consistently provides a reasonably good fit to these data.
Figure G-l presents an example of a lognormal probability curve. Lognormal distributions assign
positive probability only to positive values, and pollutant concentrations cannot hold negative
values.
Figure G-1. An example lognormal probability curve.
If a random variable A'has a lognormal distribution, its logarithm Y= log(A) has a normal
distribution. The lognormal distribution and its properties and common applications are detailed in
Aitchison and Brown (1969) and in Crow and Shimizu (1988). If Fhas a normal distribution with
expected value ju and variance a2, the cumulative probability distribution function of X (i.e., the
G-l

-------
Appendix G: Lognormal Distribution
probability that Xcan hold values less than or equal to some specified value x) takes the following
form:
F[X
-------
Appendix G: Lognormal Distribution
autocorrelation factor and 0 < p < 1, where the greater the value of p, the higher the correlation
between days.
Because Y = log(X) has a normal distribution, ju is known as a maximum likelihood estimator
for ju, which has several highly attractive statistical properties. Also, the estimator 62unbiased is the
maximum likelihood estimator for a2, after an adjustment is made to allow the estimator to be
unbiased.
Long-Term Average Calculations
A long-term average represents the average pollutant level that a system can be expected to achieve
within its treated effluent over a period of time. EPA sets the long-term average equal to the
estimated expected value of the pollutant level. Under the lognormal distribution, this is equal to
LTA = exp(/i + 0.5d2unbiased)
Variability Factor Calculations
A daily (i.e., one-day) variability factor (denoted as VF\) for a specified pollutant and system is
calculated as the ratio of the estimate of the 99th percentile, P99, of the distribution of X, to the
estimate of the expected value, E(X). Under the lognormal distribution
VF, = = exPt"_+ ^326<7„,H ,) = exp(2 326d _ }
E[X] exp(// + 0.5fj,m/„;,vr/)
Under lognormal assumptions, the value of the daily variability factor VF/ varies according to the
value of the standard deviation of the log-transformed measurements, ounbiased. Under these
assumptions, the smallest value that VFt can hold is 1, which occurs when ounbiased = 0. To
determine the largest value that VFt can hold, we differentiate the formula for VFt relative to
°unbiased - set it equal to zero, and solve for ounbiased:
= [exp(2.32fkT„„sw -0.5ff^)H2.326- 2(0.5*,^,)] = 0
unbiased
Note that this expression can equal zero only if the second component of this product equals zero.
This occurs when ounbiased = 2.326. Therefore, we substitute this value of ounbiased into the formula
for VFi to obtain its maximum value:
exp(2.326(2.326)-0.5(2.326)2) = exp(0.5(2.326)2) =exp(2.705) =14.96.
Thus, as the value of 
-------
Appendix G: Lognormal Distribution
Example
This section provides an example using data from System KC3.Pond shown in Table G-l. This
section applies the equations above to the data to show the calculations resulting in the system-
specific long-term average (LTA) of 47.593 nephelometric turbidity units (NTU) and the daily
variability factor (VFi) of 2.809 with an estimated autocorrelation factor (p) of 0.8.
Table G-1 Turbidity data from system KC.Pond

Turbidity
log
Date
(NTU)
(turbidity)
1/4/2008
25.125
3.223863
1/8/2008
33.900
3.523415
1/9/2008
38.271
3.644692
1/10/2008
42.094
3.739905
1/11/2008
59.640
4.088326
1/1 2/2008
63.985
4.158649
1/14/2008
44.463
3.794657
. (3.224)+ (3.523)+ (3.645)+ (3.740)+ (4.088)+ (4.159)+ (3.795) „ 7Qn
ju =	= 6.1 oy
7
§{p) = 1"f"^7^~~TrY7~~~7To I (7-D-
7(7-1)
1-0.8

0.8(1 — 0.8 )
1-0.8
= 0.419
^unbiased
'(3.224 — 3.739)2 + (3.523-3.739)2 +•••+ (3.795-3.739)2 _	_0 197
0.419(7-1)
LTA = exp (/) + 0.5d2unbiased) = exp((3.739 + (0.5 x 0.497)) = 47.593
VFX = exp(2.326
-------
Appendix H
Regional Rainfall/Runoff Information Representative of Major
U.S. Metropolitan Areas

-------
Appendix H: Regional Rainfall/Runoff Information
Introduction
EPA evaluated eleven cities dispersed across the contiguous United States to estimate runoff
coefficients (i.e., the ratio of the depth of estimated runoff divided by the depth of precipitation).
Thirty years of rainfall records were reviewed to first select a typical rainfall year, and then all of
the individual events in the typical year were evaluated. EPA based its assessment on hourly
rainfall data obtained from Earthlnfo Version 2.31 (www.earthinfo.com). Earthlnfo provides
National Climate Data Center (NCDC) meteorologic data in an easy to use format from which
precipitation data can be extracted. From the 7,000 NCDC gages available, EPA elected to use the
gage located at the airport of the indicator city for each EPA Region.
In general, the period of rainfall record analyzed was between the mid-1970s and mid-1990s. If a
single year appeared to be significantly lower the surrounding years, EPA reviewed the year's
record to verify that the record spanned a full year. For some meteorological stations, month long
or greater gaps existed in the records. Presumably this originates from periods when the station was
undergoing maintenance or an upgrade. To the degree possible, rainfall years with month-long data
gaps were identified and removed from the analyses.
Because of the large variation in rainfall patterns nationwide, EPA selected representative cities in
each EPA Region to use as a point estimate for the entire Region. Using the greatest rate of
development, EPA identified major metropolitan areas within each of the 10 EPA Regions to serve
as indicators. The indicator cites selected for the 10 EPA Regions are provided in Table H-l. Note,
two indicator cities were evaluated for EPA Region 10, in part to assess expected variability in
rainfall between damp coastal areas (e.g., Seattle metropolitan area) and arid inland western flank
of the Rocky Mountains (e.g., Boise, Idaho).
Table H-1. EPA Region indicators
EPA Region
Indicator city
Station identification information
1
Manchester, NH
WBAN 1683
2
Albany, NY
WBAN 14735
3
Washington, DC—VA—MD
National Arboretum 18-6350
4
Atlanta, GA
NWS Coop ID 451
5
Chicago, IL—IN
WBAN 94846
6
Dallas-Fort Worth—Arlington, TX
WBAN 13881
7
Kansas City, MO—KS
NWS Coop ID 3947
8
Denver-Aurora, CO
WBAN 23169
9
Las Vegas, NV
WBAN 13874
10
Boise City, ID
Seattle, WA
WBAN 1022 and WBAN 24233, respectively
* WBAN = Weather Bureau Army Navy, NWS = National Weather Service
For each of the indicator cities in Table 1, EPA identified a "typical" rainfall year from the 30 years
of NCDC precipitation records. Ideally a typical year would contain no large rainfall events (i.e.,
larger than the 2 year event) and all precipitation events would sum to the long-term average annual
precipitation amount. For most of the indicator cities, EPA was able to obtain a year within +/- 5
percent of the long term average. However, for a few of the typical years selected for indicator
cities, the precipitation record included an event larger than the 2-year event but smaller than the 5-
H-2

-------
Appendix H: Regional Rainfall/Runoff Information
year event. Note, additional statistics on the meteorological years that were selected is provided in
Table H-2.
Table H-2. Summary precipitation statistics for indicator cities
Indicator city
Basic gage statistics (event size in inches)
Annual
precipitation
expected to
produce runoff *
Maximum
event
Median
event
Annual
number of
events*
Year judged
to be typical
Albany, NY
35.14
2.60
0.39
66
1991
Atlanta, GA
46.61
3.63
0.49
64
1997
Boise, ID
9.80
0.86
0.22
34
1999
Chicago, IL
31.42
2.93
0.36
61
1991
Dallas, TX
32.33
3.46
0.48
46
1984
Denver, CO
13.72
1.77
0.27
33
1994
Kansas City, KS
33.85
3.53
0.44
54
1990
Las Vegas, NV
3.39
0.88
0.25
10
1981
Manchester/Concord, NH
35.77
2.38
0.40
62
1995
Olympia, WA
46.55
4.01
0.38
70
1974
Washington DC
36.14
2.45
0.44
60
2004
* Includes only those events larger than 0.1 inches in depth. The minimum separation between individual events is set at 8 hours. The
values provided do not distinguish between rainfall and snowfall.
Runoff Coefficients Evaluation
Estimates of the percentage of rainfall converting into runoff (referred to as the runoff coefficient)
were derived by employing the National Resource Conservation Service (NRCS) curve number
(CN) for four Hydrologic Soil Groups (HSG) of soil (Classes A through D). The results of the
evaluation are forty-four annual runoff coefficients (4 soil classes for each of the eleven indicator
cities).
EPA used soil coverage data provided in the State Soil Geographic Database (STATSGO) (Wolock
1997 and USDA 2007) and the CONUS-SOIL data layers (Miller and White, 1998) for evaluating
soils in areas undergoing development around each indicator city. The HSG for geographic areas
are presented in STATSGO in terms of the percent of land area that is made up of soils
characterized as either type A, B, C, or D. These four soil hydrologic classifications are correlated
to the soil CN used with the NRCS Curve Number methods to convert inches of rainfall into inches
of runoff. The curve numbers selected to represent the four HSGs at construction sites were:
Table H-3. Curve numbers selected to represent the four HSGs at construction sites
HSG
Class A soil
Class B soil
Class C soil
Class D soil
CN for Newly Grade Areas*
77
86
91
94
•TXDOT 2009
Table H-4 indicates the annual runoff coefficients for each HSG estimated for each indicator city.
The annual runoff coefficient was calculated by dividing the total runoff volume from all of the
individual rainfall events by the total annual rainfall amount.
H-3

-------
Appendix H: Regional Rainfall/Runoff Information
EPA also evaluated monthly runoff coefficients (i.e., the total monthly runoff amount divided by
the total monthly precipitation amount). For any single indicator city, the monthly runoff
coefficient values vary above and below the annual values provided in Table 3. In general, the
maximum monthly runoff coefficient value is more than 100 percent greater than the annual runoff
coefficient. The minimum monthly runoff coefficient is in general within 25 percent of the annual
average runoff coefficient value. Note, the greatest monthly percent variation is for A soils (the
lowest runoff producers) and the least variation is for D soils (the highest runoff producers).
Attachment A provides detail information on monthly and annual runoff coefficients for the
indicator cites.
Table H-3. Estimated annual runoff coefficients by hydrologic soil group (HSG) for indicator regions
City
EPA Region*
A soil
B soil
C soil
D soil
Manchester, NH
1
0.15
0.26
0.36
0.46
Albany, NY
2
0.12
0.23
0.34
0.45
Washington, DC
3
0.15
0.27
0.39
0.49
Atlanta, GA
4
0.17
0.30
0.41
0.52
Chicago, IL
5
0.14
0.26
0.37
0.47
Dallas, TX
6
0.14
0.28
0.41
0.52
Kansas City, KS
7
0.13
0.25
0.37
0.47
Denver, CO
8
0.04
0.10
0.18
0.27
Las Vegas, NV
9
0.03
0.10
0.18
0.26
Boise, ID
10a
0.01
0.04
0.09
0.16
Seattle, WA
10b
0.13
0.22
0.32
0.42
* EPA Region 10 was divided into to portions to help account for differences in rainfall patterns.
References
TXDOT, 2009 Hydraulic Design Manual, Texas Department of Transportation (TxDOT).
.
Accessed October 2009.
USDA (U.S. Department of Agriculture). 2007. U.S. General Soil Map (STATSGO) (Database).
U.S. Department of Agriculture, Natural Resources Conservation Service, Washington, DC.
. Updated July 11, 2007.
Wolock, D.M. 1997. STATSGO soil characteristics for the conterminous United States: U.S.
Geological Survey Open-File Report 97-656. U.S. Geological Survey, Reston, VA. . Accessed December 2007.
H-4

-------
Appendix H: Regional Rainfall/Runoff Information
Attachment A. Monthly and Annual Runoff Coefficients for Indicator Cities
Concord, NH Station WBAN # NH1683	Calander Year Evaluated	1995
SCS Runoff Estimates	Computed Runoff Coefficients

A soil
B soil
C soil
D soil
A soil
B soil
C soil
D soil
Jan
0.13
0.35
0.61
0.86
0.06
0.16
0.28
0.39
Feb
-
-
-
-
-
-
-
-
Mar
0.00
0.05
0.14
0.25
0.00
0.04
0.11
0.19
Apr
0.01
0.07
0.18
0.33
0.00
0.04
0.10
0.17
May
0.08
0.27
0.52
0.80
0.03
0.09
0.18
0.27
Jun
0.00
0.03
0.12
0.25
0.00
0.02
0.07
0.14
Jul
0.16
0.43
0.77
1.13
0.04
0.12
0.22
0.32
Aug
0.06
0.21
0.43
0.67
0.03
0.10
0.20
0.30
Sep
0.30
0.63
0.93
1.21
0.12
0.25
0.37
0.48
Oct
3.14
4.58
5.68
6.51
0.34
0.50
0.62
0.71
Nov
1.16
2.03
2.80
3.45
0.19
0.34
0.47
0.58
Dec
-
-
-
-
-
-
-
-
Annual
5.04
8.66
12.18
15.46
0.15
0.26
0.36
0.46
Albany, NY Station WBAN # 14735	Calander Year Evaluated	1991
SCS Runoff Estimates	Computed Runoff Coefficients

A soil
B soil
C soil
D soil
A soil
B soil
C soil
D soil
Jan
-
-
-
-
-
-
-
-
Feb
0.04
0.12
0.21
0.30
0.06
0.18
0.31
0.44
Mar
0.12
0.27
0.46
0.65
0.05
0.13
0.21
0.30
Apr
0.51
0.99
1.47
1.93
0.12
0.24
0.36
0.47
May
0.20
0.47
0.77
1.07
0.07
0.17
0.28
0.39
Jun
0.11
0.28
0.49
0.69
0.06
0.17
0.29
0.41
Jul
0.01
0.05
0.12
0.23
0.00
0.03
0.09
0.16
Aug
0.27
0.70
1.19
1.68
0.06
0.16
0.28
0.39
Sep
0.37
0.78
1.19
1.57
0.11
0.23
0.36
0.47
Oct
0.35
0.83
1.32
1.78
0.09
0.22
0.35
0.47
Nov
1.49
2.26
2.85
3.28
0.31
0.48
0.60
0.69
Dec
0.24
0.45
0.66
0.84
0.11
0.21
0.31
0.40
Annual	3.70	7.21	10.73	14.01 0.12	0.23	0.34	0.45
H-5

-------
Appendix H: Regional Rainfall/Runoff Information
Vtehingtcm,DC	Station Location: National Arboretum 18-6350	Calander Year Evaluated	2004
NRCS-based Runoff Estimates	Computed Rinioff Coeffldaits



A soil
Bsoil
Csoil
Dsoil
Asoil Bsoil
Csoil
Dsoil

Jan

0.01
0.07
0.17
0.30
0.00 0.05
0.13
0.22

Feb

0.45
0.79
1.10
1.35
0.20 0.35
0.48
0.59

Mar

0.35
0.72
1.08
1.41
0.10 0.21
0.32
0.42

y^r

0.20
0.44
0.70
0.96
0.08 0.17
0.27
0.38

fvfey

0.15
0.36
0.60
0.85
0.05 0.12
0.20
0.29

Jun

0.44
0.92
1.38
1.79
0.13 0.27
0.40
0.52

Jul

1.36
2.38
3.28
4.03
0.20 0.35
0.48
0.59

Ai
ig

0.97
1.56
2.11
2.59
0.19 0.31
0.41
0.51

Sep

0.99
1.54
2.00
2.36
0.25 0.40
0.51
0.61

Oct

0.01
0.10
0.24
0.40
0.01 0.06
0.14
0.23

Nov

1.14
1.84
2.43
2.91
0.23 0.38
0.50
0.60

Dsc

0.20
0.48
0.80
1.09
0.08 0.19
0.32
0.43

Annual

6.28
11.21
15.88
20.06
0.15 0.27
0.39
0.49


Atlanta, Ga
NWS Coop ID 451


Calander Year Evaluated
1997


SCS Runoff Estimates


Computed Runoff Coefficients




A soil
B soil
C soil
D soil
A soil
B soil
C soil
D soil

Jan

0.48
0.99
1.52
2.01

0.11 0.23
0.35
0.46
Feb

1.25
2.32
3.28
4.10

0.18 0.33
0.46
0.58
Mar

0.12
0.31
0.52
0.75

0.06 0.15
0.25
0.36
Apr

0.46
0.88
1.30
1.69

0.13 0.24
0.35
0.46
May

0.24
0.60
1.00
1.38

0.07 0.19
0.31
0.43
Jun

0.18
0.51
0.91
1.33

0.05 0.13
0.24
0.35
Jul

0.92
1.50
2.02
2.46

0.20 0.33
0.44
0.54
Aug

0.03
0.11
0.22
0.34

0.02 0.09
0.18
0.27
Sep

1.75
2.45
2.96
3.35

0.37 0.52
0.63
0.71
Oct

1.60
2.33
2.91
3.37

0.32 0.46
0.58
0.67
Nov

0.40
0.79
1.18
1.54

0.12 0.25
0.37
0.49
Dec

0.88
1.50
2.09
2.60

0.18 0.31
0.42
0.53
Annual	8.30	14.29	19.91	24.93	0.17	0.30	0.41	0.52
H-6

-------
Appendix H: Regional Rainfall/Runoff Information
Chicago, IL Station WBAN # 94846	Calander Year Evaluated 1991
SCS Runoff Estimates	Computed Runoff Coefficients

A soil E
soil
C soil
D soil

A soil
B soil
C soil
D soil
Jan
-
-
-
-

-
-
-
-
Feb
-
-
-
-

-
-
-
-
Mar
0.13
0.37
0.64
0.94
0.05
0.13
0.23
0.34
Apr
0.98
1.69
2.35
2.94
0.17
0.30
0.41
0.52
May
1.16
1.86
2.48
3.02
0.21
0.34
0.45
0.55
Jun
0.18
0.35
0.52
0.66
0.16
0.32
0.46
0.59
Jul
0.03
0.10
0.21
0.34
0.02
0.07
0.15
0.24
Aug
0.30
0.58
0.85
1.11
0.12
0.24
0.36
0.46
Sep
0.03
0.12
0.24
0.39
0.01
0.07
0.14
0.23
Oct
1.59
2.72
3.73
4.57
0.20
0.35
0.48
0.59
Nov
0.04
0.18
0.37
0.59
0.02
0.08
0.17
0.27
Dec
0.05
0.14
0.26
0.38
0.04
0.13
0.24
0.35
Annual
4.48
8.12
11.67
14.94
0.14
0.26
0.37
0.47

Ft Worth, Tx Station WBAN# 13881


Calander Year Evaluated
1984


SCS Runoff Estimates



Computed Runoff Coefficients



A soil
B soil
C soil
D soil

A soil E
soil C soil
D soil
Jan
0.02
0.10
0.20
0.32

0.02
0.09
0.19
0.29
Feb
0.29
0.71
1.13
1.53

0.09
0.23
0.36
0.49
Mar
1.14
1.97
2.65
3.18

0.23
0.40
0.54
0.65
Apr
0.06
0.18
0.33
0.49

0.04
0.13
0.24
0.35
May
0.54
0.99
1.41
1.77

0.18
0.33
0.46
0.58
Jun
0.56
1.01
1.41
1.73

0.20
0.36
0.51
0.62
Jul
0.00
0.01
0.04
0.07

0.00
0.03
0.09
0.16
Aug
0.18
0.36
0.54
0.71

0.12
0.25
0.37
0.48
Sep
-
-
-
-

-
-
-
-
Oct
0.96
1.73
2.46
3.12

0.15
0.27
0.38
0.48
Nov
0.39
0.80
1.19
1.55

0.13
0.27
0.40
0.52
Dec
0.74
1.55
2.35
3.08

0.12
0.25
0.39
0.51
Annual	4.89	9.41	13.72	17.54 0.14	0.28	0.41	0.52
Kansas City, N NWS Coop ID 3947	Calander Year Evaluated	1990
NRCS-based Runoff Estimates	Computed Runoff Coefficients

A soil
ESsoil
Csoil
Dsoil
A soil
ESsoil
Csoil
Dsoil
Jan
0.16
0.38
0.61
0.83
0.08
0.19
0.30
0.41
Feb
0.05
0.16
0.30
0.47
0.03
0.09
0.18
0.28
Mar
0.69
1.25
1.79
2.28
0.15
0.26
0.37
0.48
Apr
0.78
1.28
1.71
2.05
0.23
0.38
0.50
0.60
May
0.25
0.68
1.16
1.64
0.06
0.16
0.27
0.38
Jun
0.83
1.53
2.20
2.81
0.14
0.26
0.38
0.48
Jul
0.54
1.09
1.60
2.06
0.14
0.27
0.40
0.51
Aug
0.14
0.40
0.71
1.03
0.05
0.14
0.25
0.37
Sep
0.41
0.76
1.09
1.38
0.16
0.29
0.42
0.53
Oct
0.63
1.03
1.37
1.64
0.21
0.34
0.46
0.55
Nov
0.63
1.06
1.44
1.75
0.21
0.35
0.48
0.58
E)ec
0.00
0.01
0.04
0.09
0.00
0.01
0.05
0.12
Annual	5.12	9.63 14.02	18.04	0.13	0.25	0.37	0.47
H-7

-------
Appendix H: Regional Rainfall/Runoff Information
Denver, Co Station WBAN# 23169	Calander Year Evaluated	1994
NRCS-based Runoff Estimates	Computed Runoff Coefficients

A soil
B soil
C soil
D soil
A soil
B soil
C soil
D soil
Jan
0.00
0.01
0.03
0.07
0.00
0.02
0.07
0.13
Feb
-
-
-
-
-
-
-
-
Mar
-
0.00
0.02
0.03
-
0.01
0.03
0.07
Apr
0.03
0.13
0.26
0.39
0.02
0.09
0.18
0.27
May
0.18
0.39
0.62
0.84
0.09
0.19
0.30
0.41
Jun
0.14
0.30
0.47
0.63
0.097
0.21
0.33
0.44
Jul
0.04
0.18
0.38
0.61
0.02
0.09
0.18
0.28
Aug
0.04
0.13
0.25
0.38
0.03
0.08
0.16
0.25
Sep
-
0.00
0.01
0.02
-
0.00
0.03
0.07
Oct
0.01
0.07
0.17
0.30
0.01
0.04
0.11
0.19
Nov
-
-
0.00
0.01
-
-
0.01
0.03
Dec
0.00
0.02
0.05
0.09
0.00
0.04
0.11
0.19
Annual	0.44	1.25	2.26	3.36	0.04	0.10	0.18	0.27
Las Vegas, NV Station WBAN# 13874	Calander Year Evaluated 1981
SCS Runoff Estimates	Computed Runoff Coefficients
Jan
A soil
B soil
C soil
D soil
A soil
B soil
C soil
D soil
Feb
-
0.00
0.01
0.02
-
0.00
0.05
0.12
Mar
0.11
0.28
0.47
0.64
0.07
0.19
0.32
0.45
Apr
-
-
-
-
-
-
-
-
May
0.00
0.02
0.04
0.08
0.00
0.03
0.09
0.17
Jun
-
-
-
-
-
-
-
-
Jul
-
-
-
-
-
-
-
-
Aug
-
-
0.00
0.01
-
-
0.00
0.03
Sep
-
-
0.00
0.01
-
-
0.01
0.04
Oct
-
-
-
-
-
-
-
-
Nov
-
0.01
0.03
0.05
-
0.03
0.10
0.19
Dec
-
-
-
-
-
-
-
-
Annual
0.11
0.30
0.55
0.82
0.03
0.10
0.18
0.26
H-8

-------
Appendix H: Regional Rainfall/Runoff Information
Boise, Id NWS Coop ID 1022	Calander Year Evaluated 1999
SCS Runoff Estimates	Computed Runoff Coefficients

A soil
Bsoil
C soil
Dsoil
A soil
Bsoil
C soil
Dsoil
Jan
-
0.02
0.08
0.18
-
0.01
0.06
0.13
Feb
0.00
0.02
0.08
0.18
0.00
0.01
0.05
0.10
Mar
-
0.00
0.02
0.05
-
0.00
0.03
0.08
Apr
-
0.01
0.03
0.07
-
0.01
0.05
0.11
May
0.06
0.16
0.27
0.37
0.07
0.17
0.28
0.38
Jun
0.00
0.03
0.06
0.10
0.00
0.05
0.13
0.22
Jul
-
-
-
-
-
-
-
-
Aug
-
0.01
0.02
0.05
-
0.02
0.08
0.16
Sep
-
-
-
-
-
-
-
-
Oct
-
-
-
-
-
-
-
-
Nov
0.02
0.08
0.16
0.26
0.02
0.08
0.16
0.26
Dec
-
0.00
0.01
0.04
-
0.00
0.02
0.05
Annual	0.08	0.32	0.75	1.30	0.01	0.04	0.09	0.16
H-9

-------
Appendix I
Model Project Costs for Regulatory Options

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Alabama
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Alabama
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Alabama
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Alabama
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Alabama
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Alabama
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Alabama
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Alabama
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Alabama
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Alabama
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Alabama
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Alaska
1-2.99
1.9
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
Alaska
3-4.99
3.8
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
Alaska
5-7.49
6.0
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
Alaska
7.5-9.99
8.5
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
Alaska
10-14.99
12.0
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
Alaska
15-19.99
17.0
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
Alaska
20-29.99
23.0
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
Alaska
30-39.99
34.0
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
Alaska
40-59.99
46.0
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
Alaska
60-79.99
69.0
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
Alaska
80-99.99
85.1
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
Alaska
100 <
145.0
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
Arizona
1-2.99
1.9
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
Arizona
3-4.99
3.8
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
Arizona
5-7.49
6.0
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
Arizona
7.5-9.99
8.5
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
Arizona
10-14.99
12.0
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
Arizona
15-19.99
17.0
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
Arizona
20-29.99
23.0
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
Arizona
30-39.99
34.0
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
Arizona
40-59.99
46.0
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
1-1

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
60-79.99
69.0
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
Arizona
80-99.99
85.1
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
Arizona
100 <
145.0
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
Arkansas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Arkansas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Arkansas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Arkansas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Arkansas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Arkansas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Arkansas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Arkansas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Arkansas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Arkansas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Arkansas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Arkansas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
California
1-2.99
1.9
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
California
3-4.99
3.8
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
California
5-7.49
6.0
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
California
7.5-9.99
8.5
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
California
10-14.99
12.0
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
California
15-19.99
17.0
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
California
20-29.99
23.0
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
California
30-39.99
34.0
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
California
40-59.99
46.0
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
California
60-79.99
69.0
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
California
80-99.99
85.1
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
California
100 <
145.0
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
Colorado
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Colorado
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Colorado
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Colorado
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Colorado
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Colorado
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
1-2

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Colorado
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Colorado
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Colorado
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Colorado
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Colorado
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Connecticut
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Connecticut
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Connecticut
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Connecticut
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Connecticut
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Connecticut
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Connecticut
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Connecticut
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Connecticut
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Connecticut
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Connecticut
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Connecticut
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Delaware
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Delaware
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Delaware
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Delaware
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Delaware
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Delaware
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Delaware
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Delaware
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Delaware
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Delaware
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Delaware
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Delaware
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
District of
Columbia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
District of
Columbia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
1-3

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
District of
Columbia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
District of
Columbia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
District of
Columbia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
District of
Columbia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
District of
Columbia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
District of
Columbia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
District of
Columbia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
District of
Columbia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
District of
Columbia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Florida
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Florida
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Florida
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Florida
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Florida
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Florida
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Florida
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Florida
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Florida
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Florida
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Florida
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Florida
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Georgia
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Georgia
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Georgia
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Georgia
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Georgia
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Georgia
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
1-4

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Georgia
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Georgia
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Georgia
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Georgia
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Georgia
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Hawaii
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Hawaii
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Hawaii
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Hawaii
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Hawaii
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Hawaii
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Hawaii
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Hawaii
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Hawaii
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Hawaii
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Hawaii
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Hawaii
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Idaho
1-2.99
1.9
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
Idaho
3-4.99
3.8
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
Idaho
5-7.49
6.0
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
Idaho
7.5-9.99
8.5
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
Idaho
10-14.99
12.0
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
Idaho
15-19.99
17.0
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
Idaho
20-29.99
23.0
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
Idaho
30-39.99
34.0
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
Idaho
40-59.99
46.0
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
Idaho
60-79.99
69.0
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
Idaho
80-99.99
85.1
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
Idaho
100 <
145.0
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
Illinois
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Illinois
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Illinois
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
1-5

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Illinois
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Illinois
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Illinois
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Illinois
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Illinois
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Illinois
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Illinois
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Illinois
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Indiana
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Indiana
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Indiana
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Indiana
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Indiana
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Indiana
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Indiana
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Indiana
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Indiana
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Indiana
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Indiana
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Indiana
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Iowa
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Iowa
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Iowa
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Iowa
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Iowa
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Iowa
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Iowa
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Iowa
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Iowa
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Iowa
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Iowa
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Iowa
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
1-6

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Kansas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Kansas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Kansas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Kansas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Kansas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Kansas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Kansas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Kansas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Kansas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Kansas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Kansas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Kansas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Kentucky
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Kentucky
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Kentucky
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Kentucky
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Kentucky
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Kentucky
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Kentucky
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Kentucky
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Kentucky
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Kentucky
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Kentucky
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Kentucky
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Louisiana
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Louisiana
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Louisiana
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Louisiana
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Louisiana
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Louisiana
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Louisiana
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Louisiana
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Louisiana
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
1-7

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Louisiana
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Louisiana
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Maine
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Maine
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Maine
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Maine
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Maine
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Maine
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Maine
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Maine
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Maine
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Maine
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Maine
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Maine
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Maryland
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Maryland
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Maryland
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Maryland
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Maryland
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Maryland
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Maryland
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Maryland
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Maryland
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Maryland
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Maryland
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Maryland
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Massachusetts
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Massachusetts
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Massachusetts
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Massachusetts
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Massachusetts
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Massachusetts
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
1-8

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Massachusetts
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Massachusetts
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Massachusetts
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Massachusetts
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Massachusetts
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Michigan
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Michigan
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Michigan
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Michigan
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Michigan
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Michigan
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Michigan
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Michigan
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Michigan
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Michigan
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Michigan
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Michigan
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Minnesota
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Minnesota
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Minnesota
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Minnesota
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Minnesota
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Minnesota
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Minnesota
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Minnesota
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Minnesota
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Minnesota
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Minnesota
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Minnesota
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Mississippi
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Mississippi
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Mississippi
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
1-9

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Mississippi
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Mississippi
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Mississippi
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Mississippi
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Mississippi
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Mississippi
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Mississippi
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Mississippi
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Missour

1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Missour

3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Missour

5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Missour

7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Missour

10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Missour

15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Missour

20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Missour

30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Missour

40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Missour

60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Missour

80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Missour

100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Montana
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Montana
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Montana
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Montana
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Montana
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Montana
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Montana
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Montana
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Montana
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Montana
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Montana
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Montana
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
1-10

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Nebraska
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Nebraska
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Nebraska
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Nebraska
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Nebraska
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Nebraska
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Nebraska
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Nebraska
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Nebraska
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Nebraska
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Nebraska
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Nebraska
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Nevada
1-2.99
1.9
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
Nevada
3-4.99
3.8
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
Nevada
5-7.49
6.0
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
Nevada
7.5-9.99
8.5
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
Nevada
10-14.99
12.0
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
Nevada
15-19.99
17.0
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
Nevada
20-29.99
23.0
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
Nevada
30-39.99
34.0
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
Nevada
40-59.99
46.0
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
Nevada
60-79.99
69.0
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
Nevada
80-99.99
85.1
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
Nevada
100 <
145.0
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
New
Hampshire
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
New
Hampshire
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
New
Hampshire
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
New
Hampshire
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
New
Hampshire
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
New
Hampshire
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
1-11

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
New
Hampshire
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
New
Hampshire
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
New
Hampshire
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
New
Hampshire
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
New
Hampshire
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
New Jersey
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
New Jersey
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
New Jersey
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
New Jersey
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
New Jersey
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
New Jersey
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
New Jersey
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
New Jersey
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
New Jersey
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
New Jersey
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
New Jersey
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
New Jersey
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
New Mexico
1-2.99
1.9
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
New Mexico
3-4.99
3.8
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
New Mexico
5-7.49
6.0
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
New Mexico
7.5-9.99
8.5
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
New Mexico
10-14.99
12.0
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
New Mexico
15-19.99
17.0
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
New Mexico
20-29.99
23.0
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
New Mexico
30-39.99
34.0
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
New Mexico
40-59.99
46.0
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
New Mexico
60-79.99
69.0
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
New Mexico
80-99.99
85.1
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
New Mexico
100 <
145.0
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
1-12

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New York
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
New York
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
New York
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
New York
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
New York
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
New York
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
New York
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
New York
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
New York
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
New York
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
New York
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
New York
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
North Carolina
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
North Carolina
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
North Carolina
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
North Carolina
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
North Carolina
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
North Carolina
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
North Carolina
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
North Carolina
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
North Carolina
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
North Carolina
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
North Carolina
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
North Carolina
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
North Dakota
1-2.99
1.9
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
North Dakota
3-4.99
3.8
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
North Dakota
5-7.49
6.0
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
North Dakota
7.5-9.99
8.5
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
North Dakota
10-14.99
12.0
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
North Dakota
15-19.99
17.0
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
North Dakota
20-29.99
23.0
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
North Dakota
30-39.99
34.0
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
North Dakota
40-59.99
46.0
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
1-13

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
60-79.99
69.0
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
North Dakota
80-99.99
85.1
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
North Dakota
100 <
145.0
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
Ohio
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Ohio
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Ohio
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Ohio
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Ohio
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Ohio
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Ohio
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Ohio
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Ohio
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Ohio
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Ohio
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Ohio
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Oklahoma
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Oklahoma
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Oklahoma
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Oklahoma
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Oklahoma
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Oklahoma
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Oklahoma
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Oklahoma
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Oklahoma
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Oklahoma
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Oklahoma
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Oklahoma
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Oregon
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Oregon
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Oregon
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Oregon
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Oregon
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Oregon
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
1-14

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Oregon
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Oregon
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Oregon
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Oregon
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Oregon
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Pennsylvania
1-2.99
1.9
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
Pennsylvania
3-4.99
3.8
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
Pennsylvania
5-7.49
6.0
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
Pennsylvania
7.5-9.99
8.5
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
Pennsylvania
10-14.99
12.0
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
Pennsylvania
15-19.99
17.0
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
Pennsylvania
20-29.99
23.0
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
Pennsylvania
30-39.99
34.0
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
Pennsylvania
40-59.99
46.0
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
Pennsylvania
60-79.99
69.0
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
Pennsylvania
80-99.99
85.1
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
Pennsylvania
100 <
145.0
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
Rhode Island
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Rhode Island
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Rhode Island
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Rhode Island
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Rhode Island
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Rhode Island
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Rhode Island
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Rhode Island
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Rhode Island
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Rhode Island
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Rhode Island
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Rhode Island
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
South Carolina
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
South Carolina
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
South Carolina
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
1-15

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
South Carolina
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
South Carolina
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
South Carolina
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
South Carolina
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
South Carolina
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
South Carolina
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
South Carolina
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
South Carolina
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
South Dakota
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
South Dakota
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
South Dakota
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
South Dakota
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
South Dakota
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
South Dakota
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
South Dakota
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
South Dakota
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
South Dakota
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
South Dakota
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
South Dakota
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
South Dakota
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Tennessee
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Tennessee
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Tennessee
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Tennessee
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Tennessee
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Tennessee
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Tennessee
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Tennessee
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Tennessee
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Tennessee
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Tennessee
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Tennessee
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
1-16

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Texas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Texas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Texas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Texas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Texas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Texas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Texas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Texas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Texas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Texas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Texas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Texas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Utah
1-2.99
1.9
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
Utah
3-4.99
3.8
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
Utah
5-7.49
6.0
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
Utah
7.5-9.99
8.5
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
Utah
10-14.99
12.0
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
Utah
15-19.99
17.0
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
Utah
20-29.99
23.0
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
Utah
30-39.99
34.0
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
Utah
40-59.99
46.0
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
Utah
60-79.99
69.0
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
Utah
80-99.99
85.1
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
Utah
100 <
145.0
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
Vermont
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Vermont
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Vermont
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Vermont
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Vermont
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Vermont
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Vermont
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Vermont
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Vermont
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
1-17

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Vermont
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Vermont
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Virginia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Virginia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Virginia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Virginia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Virginia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Virginia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Virginia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Virginia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Virginia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Virginia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Virginia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Virginia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Washington
1-2.99
1.9
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
Washington
3-4.99
3.8
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
Washington
5-7.49
6.0
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
Washington
7.5-9.99
8.5
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
Washington
10-14.99
12.0
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
Washington
15-19.99
17.0
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
Washington
20-29.99
23.0
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
Washington
30-39.99
34.0
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
Washington
40-59.99
46.0
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
Washington
60-79.99
69.0
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
Washington
80-99.99
85.1
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
Washington
100 <
145.0
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
West Virginia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
West Virginia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
West Virginia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
West Virginia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
West Virginia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
West Virginia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
1-18

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
West Virginia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
West Virginia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
West Virginia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
West Virginia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
West Virginia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Wisconsin
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Wisconsin
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Wisconsin
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Wisconsin
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Wisconsin
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Wisconsin
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Wisconsin
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Wisconsin
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Wisconsin
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Wisconsin
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Wisconsin
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Wisconsin
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Wyoming
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Wyoming
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Wyoming
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Wyoming
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Wyoming
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Wyoming
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Wyoming
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Wyoming
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Wyoming
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Wyoming
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Wyoming
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Wyoming
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
1-19

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Alabama
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Alabama
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Alabama
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Alabama
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Alabama
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Alabama
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Alabama
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Alabama
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Alabama
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Alabama
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Alabama
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Alaska
1-2.99
1.9
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
Alaska
3-4.99
3.8
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
Alaska
5-7.49
6.0
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
Alaska
7.5-9.99
8.5
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
Alaska
10-14.99
12.0
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
Alaska
15-19.99
17.0
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
Alaska
20-29.99
23.0
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
Alaska
30-39.99
34.0
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
Alaska
40-59.99
46.0
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
Alaska
60-79.99
69.0
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
Alaska
80-99.99
85.1
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
Alaska
100 <
145.0
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
Arizona
1-2.99
1.9
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
Arizona
3-4.99
3.8
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
Arizona
5-7.49
6.0
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
Arizona
7.5-9.99
8.5
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
Arizona
10-14.99
12.0
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
Arizona
15-19.99
17.0
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
Arizona
20-29.99
23.0
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
Arizona
30-39.99
34.0
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
1-20

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
Arizona
60-79.99
69.0
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
Arizona
80-99.99
85.1
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
Arizona
100 <
145.0
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
Arkansas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Arkansas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Arkansas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Arkansas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Arkansas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Arkansas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Arkansas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Arkansas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Arkansas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Arkansas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Arkansas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Arkansas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
California
1-2.99
1.9
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
California
3-4.99
3.8
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
California
5-7.49
6.0
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
California
7.5-9.99
8.5
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
California
10-14.99
12.0
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
California
15-19.99
17.0
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
California
20-29.99
23.0
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
California
30-39.99
34.0
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
California
40-59.99
46.0
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
California
60-79.99
69.0
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
California
80-99.99
85.1
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
California
100 <
145.0
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
Colorado
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Colorado
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Colorado
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Colorado
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Colorado
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
1-21

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Colorado
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Colorado
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Colorado
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Colorado
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Colorado
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Colorado
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Connecticut
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Connecticut
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Connecticut
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Connecticut
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Connecticut
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Connecticut
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Connecticut
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Connecticut
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Connecticut
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Connecticut
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Connecticut
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Connecticut
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Delaware
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Delaware
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Delaware
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Delaware
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Delaware
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Delaware
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Delaware
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Delaware
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Delaware
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Delaware
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Delaware
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Delaware
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
District of
Columbia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
1-22

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
District of
Columbia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
District of
Columbia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
District of
Columbia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
District of
Columbia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
District of
Columbia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
District of
Columbia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
District of
Columbia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
District of
Columbia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
District of
Columbia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
District of
Columbia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Florida
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Florida
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Florida
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Florida
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Florida
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Florida
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Florida
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Florida
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Florida
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Florida
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Florida
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Florida
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Georgia
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Georgia
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Georgia
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Georgia
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Georgia
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
1-23

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Georgia
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Georgia
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Georgia
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Georgia
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Georgia
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Georgia
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Hawaii
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Hawaii
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Hawaii
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Hawaii
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Hawaii
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Hawaii
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Hawaii
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Hawaii
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Hawaii
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Hawaii
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Hawaii
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Hawaii
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Idaho
1-2.99
1.9
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
Idaho
3-4.99
3.8
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
Idaho
5-7.49
6.0
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
Idaho
7.5-9.99
8.5
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
Idaho
10-14.99
12.0
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
Idaho
15-19.99
17.0
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
Idaho
20-29.99
23.0
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
Idaho
30-39.99
34.0
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
Idaho
40-59.99
46.0
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
Idaho
60-79.99
69.0
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
Idaho
80-99.99
85.1
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
Idaho
100 <
145.0
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
Illinois
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Illinois
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
1-24

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Illinois
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Illinois
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Illinois
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Illinois
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Illinois
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Illinois
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Illinois
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Illinois
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Illinois
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Indiana
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Indiana
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Indiana
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Indiana
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Indiana
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Indiana
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Indiana
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Indiana
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Indiana
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Indiana
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Indiana
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Indiana
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Iowa
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Iowa
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Iowa
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Iowa
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Iowa
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Iowa
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Iowa
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Iowa
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Iowa
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Iowa
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Iowa
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
1-25

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Kansas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Kansas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Kansas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Kansas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Kansas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Kansas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Kansas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Kansas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Kansas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Kansas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Kansas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Kansas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Kentucky
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Kentucky
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Kentucky
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Kentucky
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Kentucky
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Kentucky
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Kentucky
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Kentucky
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Kentucky
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Kentucky
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Kentucky
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Kentucky
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Louisiana
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Louisiana
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Louisiana
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Louisiana
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Louisiana
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Louisiana
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Louisiana
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Louisiana
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
1-26

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Louisiana
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Louisiana
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Louisiana
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Maine
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Maine
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Maine
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Maine
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Maine
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Maine
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Maine
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Maine
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Maine
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Maine
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Maine
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Maine
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Maryland
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Maryland
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Maryland
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Maryland
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Maryland
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Maryland
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Maryland
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Maryland
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Maryland
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Maryland
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Maryland
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Maryland
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Massachusetts
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Massachusetts
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Massachusetts
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Massachusetts
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Massachusetts
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
1-27

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Massachusetts
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Massachusetts
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Massachusetts
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Massachusetts
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Massachusetts
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Massachusetts
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Michigan
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Michigan
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Michigan
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Michigan
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Michigan
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Michigan
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Michigan
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Michigan
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Michigan
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Michigan
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Michigan
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Michigan
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Minnesota
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Minnesota
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Minnesota
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Minnesota
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Minnesota
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Minnesota
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Minnesota
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Minnesota
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Minnesota
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Minnesota
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Minnesota
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Minnesota
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Mississippi
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Mississippi
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
1-28

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Mississippi
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Mississippi
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Mississippi
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Mississippi
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Mississippi
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Mississippi
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Mississippi
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Mississippi
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Mississippi
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Missour

1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Missour

3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Missour

5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Missour

7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Missour

10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Missour

15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Missour

20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Missour

30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Missour

40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Missour

60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Missour

80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Missour

100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Montana
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Montana
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Montana
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Montana
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Montana
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Montana
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Montana
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Montana
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Montana
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Montana
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Montana
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
1-29

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Nebraska
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Nebraska
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Nebraska
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Nebraska
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Nebraska
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Nebraska
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Nebraska
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Nebraska
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Nebraska
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Nebraska
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Nebraska
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Nebraska
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Nevada
1-2.99
1.9
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
Nevada
3-4.99
3.8
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
Nevada
5-7.49
6.0
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
Nevada
7.5-9.99
8.5
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
Nevada
10-14.99
12.0
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
Nevada
15-19.99
17.0
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
Nevada
20-29.99
23.0
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
Nevada
30-39.99
34.0
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
Nevada
40-59.99
46.0
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
Nevada
60-79.99
69.0
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
Nevada
80-99.99
85.1
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
Nevada
100 <
145.0
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
New
Hampshire
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
New
Hampshire
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
New
Hampshire
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
New
Hampshire
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
New
Hampshire
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
1-30

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
New
Hampshire
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
New
Hampshire
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
New
Hampshire
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
New
Hampshire
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
New
Hampshire
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
New
Hampshire
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
New Jersey
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
New Jersey
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
New Jersey
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
New Jersey
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
New Jersey
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
New Jersey
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
New Jersey
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
New Jersey
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
New Jersey
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
New Jersey
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
New Jersey
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
New Jersey
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
New Mexico
1-2.99
1.9
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
New Mexico
3-4.99
3.8
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
New Mexico
5-7.49
6.0
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
New Mexico
7.5-9.99
8.5
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
New Mexico
10-14.99
12.0
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
New Mexico
15-19.99
17.0
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
New Mexico
20-29.99
23.0
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
New Mexico
30-39.99
34.0
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
New Mexico
40-59.99
46.0
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
New Mexico
60-79.99
69.0
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
1-31

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
New Mexico
100 <
145.0
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
New York
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
New York
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
New York
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
New York
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
New York
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
New York
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
New York
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
New York
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
New York
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
New York
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
New York
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
New York
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
North Carolina
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
North Carolina
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
North Carolina
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
North Carolina
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
North Carolina
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
North Carolina
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
North Carolina
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
North Carolina
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
North Carolina
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
North Carolina
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
North Carolina
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
North Carolina
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
North Dakota
1-2.99
1.9
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
North Dakota
3-4.99
3.8
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
North Dakota
5-7.49
6.0
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
North Dakota
7.5-9.99
8.5
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
North Dakota
10-14.99
12.0
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
North Dakota
15-19.99
17.0
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
North Dakota
20-29.99
23.0
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
1-32

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
North Dakota
40-59.99
46.0
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
North Dakota
60-79.99
69.0
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
North Dakota
80-99.99
85.1
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
North Dakota
100 <
145.0
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
Ohio
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Ohio
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Ohio
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Ohio
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Ohio
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Ohio
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Ohio
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Ohio
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Ohio
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Ohio
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Ohio
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Ohio
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Oklahoma
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Oklahoma
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Oklahoma
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Oklahoma
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Oklahoma
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Oklahoma
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Oklahoma
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Oklahoma
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Oklahoma
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Oklahoma
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Oklahoma
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Oklahoma
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Oregon
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Oregon
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Oregon
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Oregon
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
1-33

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Oregon
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Oregon
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Oregon
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Oregon
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Oregon
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Oregon
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Oregon
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Pennsylvania
1-2.99
1.9
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
Pennsylvania
3-4.99
3.8
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
Pennsylvania
5-7.49
6.0
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
Pennsylvania
7.5-9.99
8.5
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
Pennsylvania
10-14.99
12.0
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
Pennsylvania
15-19.99
17.0
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
Pennsylvania
20-29.99
23.0
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
Pennsylvania
30-39.99
34.0
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
Pennsylvania
40-59.99
46.0
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
Pennsylvania
60-79.99
69.0
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
Pennsylvania
80-99.99
85.1
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
Pennsylvania
100 <
145.0
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
Rhode Island
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Rhode Island
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Rhode Island
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Rhode Island
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Rhode Island
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Rhode Island
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Rhode Island
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Rhode Island
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Rhode Island
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Rhode Island
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Rhode Island
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Rhode Island
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
South Carolina
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
1-34

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
South Carolina
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
South Carolina
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
South Carolina
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
South Carolina
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
South Carolina
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
South Carolina
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
South Carolina
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
South Carolina
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
South Carolina
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
South Carolina
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
South Dakota
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
South Dakota
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
South Dakota
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
South Dakota
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
South Dakota
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
South Dakota
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
South Dakota
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
South Dakota
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
South Dakota
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
South Dakota
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
South Dakota
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
South Dakota
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Tennessee
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Tennessee
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Tennessee
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Tennessee
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Tennessee
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Tennessee
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Tennessee
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Tennessee
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Tennessee
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Tennessee
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
1-35

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Tennessee
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Texas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Texas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Texas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Texas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Texas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Texas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Texas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Texas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Texas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Texas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Texas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Texas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Utah
1-2.99
1.9
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
Utah
3-4.99
3.8
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
Utah
5-7.49
6.0
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
Utah
7.5-9.99
8.5
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
Utah
10-14.99
12.0
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
Utah
15-19.99
17.0
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
Utah
20-29.99
23.0
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
Utah
30-39.99
34.0
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
Utah
40-59.99
46.0
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
Utah
60-79.99
69.0
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
Utah
80-99.99
85.1
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
Utah
100 <
145.0
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
Vermont
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Vermont
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Vermont
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Vermont
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Vermont
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Vermont
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Vermont
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
1-36

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Vermont
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Vermont
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Vermont
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Vermont
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Virginia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Virginia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Virginia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Virginia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Virginia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Virginia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Virginia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Virginia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Virginia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Virginia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Virginia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Virginia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Washington
1-2.99
1.9
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
Washington
3-4.99
3.8
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
Washington
5-7.49
6.0
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
Washington
7.5-9.99
8.5
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
Washington
10-14.99
12.0
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
Washington
15-19.99
17.0
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
Washington
20-29.99
23.0
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
Washington
30-39.99
34.0
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
Washington
40-59.99
46.0
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
Washington
60-79.99
69.0
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
Washington
80-99.99
85.1
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
Washington
100 <
145.0
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
West Virginia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
West Virginia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
West Virginia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
West Virginia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
1-37

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
West Virginia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
West Virginia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
West Virginia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
West Virginia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
West Virginia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
West Virginia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
West Virginia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Wisconsin
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Wisconsin
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Wisconsin
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Wisconsin
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Wisconsin
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Wisconsin
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Wisconsin
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Wisconsin
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Wisconsin
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Wisconsin
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Wisconsin
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Wisconsin
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Wyoming
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Wyoming
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Wyoming
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Wyoming
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Wyoming
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Wyoming
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Wyoming
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Wyoming
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Wyoming
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Wyoming
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Wyoming
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Wyoming
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
1-38

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Alabama
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Alabama
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Alabama
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Alabama
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Alabama
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Alabama
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Alabama
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Alabama
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Alabama
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Alabama
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Alabama
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Alaska
1-2.99
1.9
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
Alaska
3-4.99
3.8
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
Alaska
5-7.49
6.0
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
Alaska
7.5-9.99
8.5
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
Alaska
10-14.99
12.0
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
Alaska
15-19.99
17.0
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
Alaska
20-29.99
23.0
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
Alaska
30-39.99
34.0
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
Alaska
40-59.99
46.0
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
Alaska
60-79.99
69.0
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
Alaska
80-99.99
85.1
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
Alaska
100 <
145.0
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
Arizona
1-2.99
1.9
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
$4,941
Arizona
3-4.99
3.8
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
$9,775
Arizona
5-7.49
6.0
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
$15,403
Arizona
7.5-9.99
8.5
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
$21,860
Arizona
10-14.99
12.0
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
$31,024
Arizona
15-19.99
17.0
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
$44,382
Arizona
20-29.99
23.0
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
$60,839
Arizona
30-39.99
34.0
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
$92,251
1-39

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
$128,373
Arizona
60-79.99
69.0
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
$203,054
Arizona
80-99.99
85.1
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
$259,606
Arizona
100 <
145.0
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
$500,990
Arkansas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Arkansas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Arkansas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Arkansas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Arkansas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Arkansas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Arkansas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Arkansas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Arkansas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Arkansas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Arkansas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Arkansas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
California
1-2.99
1.9
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
$6,358
California
3-4.99
3.8
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
$12,610
California
5-7.49
6.0
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
$19,880
California
7.5-9.99
8.5
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
$28,203
California
10-14.99
12.0
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
$39,978
California
15-19.99
17.0
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
$57,067
California
20-29.99
23.0
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
$78,001
California
30-39.99
34.0
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
$117,622
California
40-59.99
46.0
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
$162,698
California
60-79.99
69.0
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
$254,541
California
80-99.99
85.1
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
$323,107
California
100 <
145.0
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
$609,187
Colorado
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Colorado
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Colorado
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Colorado
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Colorado
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
1-40

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Colorado
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Colorado
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Colorado
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Colorado
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Colorado
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Colorado
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Connecticut
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Connecticut
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Connecticut
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Connecticut
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Connecticut
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Connecticut
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Connecticut
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Connecticut
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Connecticut
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Connecticut
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Connecticut
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Connecticut
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Delaware
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Delaware
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Delaware
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Delaware
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Delaware
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Delaware
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Delaware
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Delaware
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Delaware
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Delaware
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Delaware
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Delaware
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
District of
Columbia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
1-41

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
District of
Columbia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
District of
Columbia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
District of
Columbia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
District of
Columbia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
District of
Columbia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
District of
Columbia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
District of
Columbia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
District of
Columbia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
District of
Columbia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
District of
Columbia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Florida
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Florida
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Florida
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Florida
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Florida
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Florida
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Florida
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Florida
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Florida
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Florida
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Florida
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Florida
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Georgia
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Georgia
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Georgia
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Georgia
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Georgia
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
1-42

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Georgia
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Georgia
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Georgia
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Georgia
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Georgia
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Georgia
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Hawaii
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Hawaii
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Hawaii
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Hawaii
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Hawaii
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Hawaii
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Hawaii
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Hawaii
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Hawaii
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Hawaii
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Hawaii
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Hawaii
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Idaho
1-2.99
1.9
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
$4,105
Idaho
3-4.99
3.8
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
$8,103
Idaho
5-7.49
6.0
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
$12,763
Idaho
7.5-9.99
8.5
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
$18,120
Idaho
10-14.99
12.0
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
$25,744
Idaho
15-19.99
17.0
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
$36,901
Idaho
20-29.99
23.0
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
$50,718
Idaho
30-39.99
34.0
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
$77,291
Idaho
40-59.99
46.0
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
$108,133
Idaho
60-79.99
69.0
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
$172,693
Idaho
80-99.99
85.1
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
$222,161
Idaho
100 <
145.0
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
$437,188
Illinois
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Illinois
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
1-43

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Illinois
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Illinois
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Illinois
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Illinois
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Illinois
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Illinois
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Illinois
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Illinois
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Illinois
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Indiana
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Indiana
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Indiana
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Indiana
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Indiana
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Indiana
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Indiana
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Indiana
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Indiana
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Indiana
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Indiana
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Indiana
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Iowa
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Iowa
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Iowa
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Iowa
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Iowa
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Iowa
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Iowa
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Iowa
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Iowa
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Iowa
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Iowa
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
1-44

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Kansas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Kansas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Kansas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Kansas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Kansas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Kansas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Kansas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Kansas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Kansas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Kansas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Kansas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Kansas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Kentucky
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Kentucky
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Kentucky
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Kentucky
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Kentucky
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Kentucky
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Kentucky
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Kentucky
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Kentucky
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Kentucky
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Kentucky
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Kentucky
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Louisiana
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Louisiana
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Louisiana
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Louisiana
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Louisiana
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Louisiana
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Louisiana
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Louisiana
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
1-45

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Louisiana
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Louisiana
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Louisiana
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Maine
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Maine
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Maine
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Maine
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Maine
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Maine
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Maine
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Maine
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Maine
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Maine
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Maine
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Maine
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Maryland
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Maryland
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Maryland
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Maryland
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Maryland
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Maryland
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Maryland
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Maryland
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Maryland
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Maryland
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Maryland
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Maryland
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Massachusetts
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Massachusetts
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Massachusetts
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Massachusetts
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Massachusetts
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
1-46

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Massachusetts
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Massachusetts
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Massachusetts
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Massachusetts
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Massachusetts
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Massachusetts
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Michigan
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Michigan
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Michigan
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Michigan
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Michigan
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Michigan
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Michigan
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Michigan
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Michigan
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Michigan
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Michigan
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Michigan
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Minnesota
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Minnesota
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Minnesota
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Minnesota
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Minnesota
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Minnesota
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Minnesota
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Minnesota
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Minnesota
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Minnesota
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Minnesota
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Minnesota
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Mississippi
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Mississippi
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
1-47

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Mississippi
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Mississippi
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Mississippi
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Mississippi
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Mississippi
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Mississippi
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Mississippi
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Mississippi
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Mississippi
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Missour

1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Missour

3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Missour

5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Missour

7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Missour

10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Missour

15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Missour

20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Missour

30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Missour

40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Missour

60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Missour

80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Missour

100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Montana
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Montana
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Montana
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Montana
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Montana
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Montana
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Montana
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Montana
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Montana
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Montana
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Montana
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
1-48

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Nebraska
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Nebraska
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Nebraska
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Nebraska
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Nebraska
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Nebraska
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Nebraska
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Nebraska
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Nebraska
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Nebraska
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Nebraska
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Nebraska
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Nevada
1-2.99
1.9
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
$3,811
Nevada
3-4.99
3.8
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
$7,516
Nevada
5-7.49
6.0
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
$11,836
Nevada
7.5-9.99
8.5
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
$16,806
Nevada
10-14.99
12.0
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
$23,889
Nevada
15-19.99
17.0
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
$34,274
Nevada
20-29.99
23.0
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
$47,163
Nevada
30-39.99
34.0
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
$72,036
Nevada
40-59.99
46.0
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
$101,023
Nevada
60-79.99
69.0
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
$162,028
Nevada
80-99.99
85.1
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
$209,008
Nevada
100 <
145.0
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
$414,776
New
Hampshire
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
New
Hampshire
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
New
Hampshire
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
New
Hampshire
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
New
Hampshire
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
1-49

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
New
Hampshire
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
New
Hampshire
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
New
Hampshire
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
New
Hampshire
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
New
Hampshire
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
New
Hampshire
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
New Jersey
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
New Jersey
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
New Jersey
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
New Jersey
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
New Jersey
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
New Jersey
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
New Jersey
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
New Jersey
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
New Jersey
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
New Jersey
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
New Jersey
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
New Jersey
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
New Mexico
1-2.99
1.9
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
$5,335
New Mexico
3-4.99
3.8
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
$10,565
New Mexico
5-7.49
6.0
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
$16,650
New Mexico
7.5-9.99
8.5
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
$23,627
New Mexico
10-14.99
12.0
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
$33,518
New Mexico
15-19.99
17.0
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
$47,915
New Mexico
20-29.99
23.0
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
$65,619
New Mexico
30-39.99
34.0
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
$99,318
New Mexico
40-59.99
46.0
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
$137,934
New Mexico
60-79.99
69.0
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
$217,395
1-50

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
$277,293
New Mexico
100 <
145.0
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
$531,126
New York
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
New York
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
New York
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
New York
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
New York
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
New York
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
New York
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
New York
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
New York
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
New York
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
New York
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
New York
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
North Carolina
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
North Carolina
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
North Carolina
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
North Carolina
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
North Carolina
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
North Carolina
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
North Carolina
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
North Carolina
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
North Carolina
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
North Carolina
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
North Carolina
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
North Carolina
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
North Dakota
1-2.99
1.9
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
$6,324
North Dakota
3-4.99
3.8
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
$12,542
North Dakota
5-7.49
6.0
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
$19,772
North Dakota
7.5-9.99
8.5
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
$28,049
North Dakota
10-14.99
12.0
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
$39,761
North Dakota
15-19.99
17.0
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
$56,759
North Dakota
20-29.99
23.0
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
$77,585
1-51

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
$117,006
North Dakota
40-59.99
46.0
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
$161,865
North Dakota
60-79.99
69.0
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
$253,292
North Dakota
80-99.99
85.1
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
$321,567
North Dakota
100 <
145.0
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
$606,563
Ohio
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Ohio
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Ohio
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Ohio
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Ohio
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Ohio
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Ohio
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Ohio
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Ohio
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Ohio
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Ohio
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Ohio
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Oklahoma
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Oklahoma
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Oklahoma
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Oklahoma
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Oklahoma
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Oklahoma
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Oklahoma
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Oklahoma
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Oklahoma
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Oklahoma
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Oklahoma
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Oklahoma
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Oregon
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Oregon
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Oregon
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Oregon
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
1-52

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Oregon
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Oregon
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Oregon
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Oregon
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Oregon
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Oregon
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Oregon
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Pennsylvania
1-2.99
1.9
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
$8,372
Pennsylvania
3-4.99
3.8
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
$16,638
Pennsylvania
5-7.49
6.0
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
$26,240
Pennsylvania
7.5-9.99
8.5
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
$37,212
Pennsylvania
10-14.99
12.0
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
$52,697
Pennsylvania
15-19.99
17.0
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
$75,085
Pennsylvania
20-29.99
23.0
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
$102,379
Pennsylvania
30-39.99
34.0
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
$153,658
Pennsylvania
40-59.99
46.0
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
$211,453
Pennsylvania
60-79.99
69.0
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
$327,674
Pennsylvania
80-99.99
85.1
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
$413,304
Pennsylvania
100 <
145.0
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
$762,872
Rhode Island
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Rhode Island
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Rhode Island
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Rhode Island
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Rhode Island
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Rhode Island
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Rhode Island
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Rhode Island
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Rhode Island
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Rhode Island
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Rhode Island
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Rhode Island
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
South Carolina
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
1-53

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
South Carolina
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
South Carolina
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
South Carolina
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
South Carolina
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
South Carolina
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
South Carolina
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
South Carolina
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
South Carolina
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
South Carolina
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
South Carolina
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
South Dakota
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
South Dakota
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
South Dakota
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
South Dakota
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
South Dakota
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
South Dakota
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
South Dakota
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
South Dakota
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
South Dakota
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
South Dakota
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
South Dakota
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
South Dakota
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Tennessee
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Tennessee
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Tennessee
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Tennessee
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Tennessee
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Tennessee
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Tennessee
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Tennessee
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Tennessee
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Tennessee
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
1-54

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Tennessee
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Texas
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Texas
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Texas
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Texas
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Texas
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Texas
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Texas
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Texas
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Texas
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Texas
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Texas
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Texas
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Utah
1-2.99
1.9
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
$5,996
Utah
3-4.99
3.8
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
$11,887
Utah
5-7.49
6.0
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
$18,738
Utah
7.5-9.99
8.5
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
$26,584
Utah
10-14.99
12.0
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
$37,693
Utah
15-19.99
17.0
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
$53,830
Utah
20-29.99
23.0
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
$73,621
Utah
30-39.99
34.0
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
$111,147
Utah
40-59.99
46.0
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
$153,939
Utah
60-79.99
69.0
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
$241,402
Utah
80-99.99
85.1
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
$306,902
Utah
100 <
145.0
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
$581,576
Vermont
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Vermont
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Vermont
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Vermont
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Vermont
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Vermont
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Vermont
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
1-55

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Vermont
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Vermont
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Vermont
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Vermont
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Virginia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
Virginia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
Virginia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
Virginia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
Virginia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
Virginia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
Virginia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
Virginia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
Virginia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
Virginia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
Virginia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
Virginia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Washington
1-2.99
1.9
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
$2,764
Washington
3-4.99
3.8
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
$5,421
Washington
5-7.49
6.0
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
$8,529
Washington
7.5-9.99
8.5
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
$12,121
Washington
10-14.99
12.0
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
$17,275
Washington
15-19.99
17.0
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
$24,904
Washington
20-29.99
23.0
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
$34,487
Washington
30-39.99
34.0
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
$53,296
Washington
40-59.99
46.0
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
$75,669
Washington
60-79.99
69.0
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
$123,998
Washington
80-99.99
85.1
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
$162,104
Washington
100 <
145.0
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
$334,857
West Virginia
1-2.99
1.9
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
$6,623
West Virginia
3-4.99
3.8
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
$13,139
West Virginia
5-7.49
6.0
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
$20,715
West Virginia
7.5-9.99
8.5
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
$29,385
1-56

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
BASELINE - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
$41,647
West Virginia
15-19.99
17.0
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
$59,431
West Virginia
20-29.99
23.0
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
$81,200
West Virginia
30-39.99
34.0
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
$122,351
West Virginia
40-59.99
46.0
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
$169,096
West Virginia
60-79.99
69.0
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
$264,139
West Virginia
80-99.99
85.1
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
$334,944
West Virginia
100 <
145.0
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
$629,356
Wisconsin
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Wisconsin
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Wisconsin
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Wisconsin
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Wisconsin
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Wisconsin
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Wisconsin
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Wisconsin
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Wisconsin
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Wisconsin
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Wisconsin
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Wisconsin
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
Wyoming
1-2.99
1.9
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
$4,373
Wyoming
3-4.99
3.8
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
$8,640
Wyoming
5-7.49
6.0
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
$13,612
Wyoming
7.5-9.99
8.5
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
$19,322
Wyoming
10-14.99
12.0
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
$27,441
Wyoming
15-19.99
17.0
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
$39,305
Wyoming
20-29.99
23.0
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
$53,971
Wyoming
30-39.99
34.0
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
$82,099
Wyoming
40-59.99
46.0
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
$114,638
Wyoming
60-79.99
69.0
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
$182,450
Wyoming
80-99.99
85.1
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
$234,195
Wyoming
100 <
145.0
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
$457,692
1-57

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alabama
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alabama
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alabama
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Alabama
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Alabama
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Alabama
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Alabama
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alaska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alaska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alaska
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Alaska
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Alaska
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Alaska
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Alaska
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Arizona
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Arizona
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Arizona
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
1-58

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Arizona
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Arizona
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Arizona
100 <
145.0
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Arkansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Arkansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Arkansas
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Arkansas
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Arkansas
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Arkansas
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Arkansas
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
California
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
California
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
California
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
California
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
California
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
California
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
California
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-59

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Colorado
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Colorado
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Colorado
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Colorado
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Colorado
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Colorado
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Connecticut
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Connecticut
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Connecticut
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Connecticut
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Connecticut
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Connecticut
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Connecticut
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Delaware
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Delaware
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Delaware
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Delaware
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Delaware
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Delaware
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Delaware
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-60

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
District of
Columbia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
District of
Columbia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
District of
Columbia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
District of
Columbia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
District of
Columbia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
District of
Columbia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
District of
Columbia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Florida
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Florida
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Florida
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Florida
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Florida
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Florida
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Florida
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-61

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Georgia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Georgia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Georgia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Georgia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Georgia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Georgia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Hawaii
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Hawaii
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Hawaii
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Hawaii
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Hawaii
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Hawaii
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Hawaii
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Idaho
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
Idaho
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Idaho
30-39.99
34.0
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
Idaho
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Idaho
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Idaho
80-99.99
85.1
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
Idaho
100 <
145.0
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-62

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Illinois
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Illinois
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Illinois
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Illinois
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Illinois
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Illinois
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Illinois
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Indiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Indiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Indiana
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Indiana
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Indiana
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Indiana
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Indiana
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Iowa
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Iowa
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Iowa
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Iowa
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Iowa
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Iowa
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
1-63

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kansas
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Kansas
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Kansas
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Kansas
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Kansas
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kentucky
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kentucky
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kentucky
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Kentucky
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Kentucky
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Kentucky
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Kentucky
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Louisiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Louisiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Louisiana
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
1-64

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Louisiana
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Louisiana
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Louisiana
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maine
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Maine
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maine
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Maine
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Maine
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Maine
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Maine
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maryland
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Maryland
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maryland
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Maryland
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Maryland
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Maryland
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Maryland
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-65

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Massachusetts
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Massachusetts
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Massachusetts
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Massachusetts
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Massachusetts
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Massachusetts
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Michigan
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Michigan
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Michigan
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Michigan
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Michigan
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Michigan
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Michigan
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Minnesota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Minnesota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Minnesota
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Minnesota
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Minnesota
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Minnesota
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Minnesota
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-66

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Mississippi
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Mississippi
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Mississippi
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Mississippi
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Mississippi
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Mississippi
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Mississippi
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Missour

15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Missour

20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Missour

30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Missour

40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Missour

60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Missour

80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Missour

100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Montana
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Montana
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Montana
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
Montana
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Montana
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Montana
80-99.99
85.1
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
1-67

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Nebraska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Nebraska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Nebraska
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Nebraska
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Nebraska
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Nebraska
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Nebraska
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
Nevada
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
Nevada
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Nevada
30-39.99
34.0
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
Nevada
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Nevada
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Nevada
80-99.99
85.1
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
Nevada
100 <
145.0
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-68

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New
Hampshire
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New
Hampshire
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
New
Hampshire
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
New
Hampshire
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
New
Hampshire
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New
Hampshire
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Jersey
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New Jersey
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New Jersey
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
New Jersey
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
New Jersey
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
New Jersey
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New Jersey
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Mexico
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
New Mexico
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
New Mexico
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
New Mexico
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
New Mexico
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
1-69

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New Mexico
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New York
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New York
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New York
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
New York
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
New York
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
New York
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New York
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
North Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
North Carolina
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
North Carolina
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
North Carolina
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
North Carolina
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
North Carolina
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Dakota
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
North Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
1-70

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
North Dakota
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
North Dakota
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
North Dakota
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
North Dakota
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Ohio
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Ohio
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Ohio
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Ohio
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Ohio
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Ohio
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Ohio
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oklahoma
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oklahoma
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oklahoma
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Oklahoma
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Oklahoma
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Oklahoma
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Oklahoma
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-71

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oregon
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oregon
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oregon
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Oregon
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Oregon
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Oregon
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Oregon
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Pennsylvania
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Pennsylvania
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Pennsylvania
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Pennsylvania
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Pennsylvania
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Pennsylvania
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Pennsylvania
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Rhode Island
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Rhode Island
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Rhode Island
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Rhode Island
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Rhode Island
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Rhode Island
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Rhode Island
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-72

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
South Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Carolina
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
South Carolina
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
South Carolina
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
South Carolina
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
South Carolina
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Dakota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
South Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Dakota
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
South Dakota
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
South Dakota
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
South Dakota
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
South Dakota
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Tennessee
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Tennessee
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Tennessee
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Tennessee
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Tennessee
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
1-73

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Tennessee
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Texas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Texas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Texas
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Texas
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Texas
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Texas
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Texas
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Utah
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Utah
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Utah
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
Utah
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Utah
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Utah
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Utah
100 <
145.0
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Vermont
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Vermont
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
1-74

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Vermont
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Vermont
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Vermont
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Vermont
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Virginia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Virginia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Virginia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Virginia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Virginia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Washington
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Washington
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Washington
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Washington
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Washington
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Washington
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Washington
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-75

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
West Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
West Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
West Virginia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
West Virginia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
West Virginia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
West Virginia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
West Virginia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wisconsin
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Wisconsin
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wisconsin
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Wisconsin
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Wisconsin
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Wisconsin
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Wisconsin
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wyoming
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Wyoming
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wyoming
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
Wyoming
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Wyoming
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Wyoming
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Wyoming
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
1-76

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alabama
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alabama
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alabama
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Alabama
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Alabama
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Alabama
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Alabama
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alaska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alaska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alaska
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Alaska
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Alaska
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Alaska
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Alaska
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Arizona
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Arizona
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
1-77

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
Arizona
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Arizona
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Arizona
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Arizona
100 <
145.0
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Arkansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Arkansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Arkansas
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Arkansas
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Arkansas
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Arkansas
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Arkansas
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
California
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
California
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
California
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
California
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
California
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
California
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
California
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-78

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Colorado
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Colorado
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Colorado
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Colorado
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Colorado
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Colorado
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Colorado
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Connecticut
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Connecticut
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Connecticut
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Connecticut
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Connecticut
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Connecticut
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Connecticut
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Delaware
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Delaware
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Delaware
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Delaware
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
1-79

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Delaware
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Delaware
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Delaware
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
District of
Columbia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
District of
Columbia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
District of
Columbia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
District of
Columbia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
District of
Columbia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
District of
Columbia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
District of
Columbia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Florida
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Florida
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Florida
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Florida
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Florida
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Florida
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
1-80

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Florida
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Georgia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Georgia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Georgia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Georgia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Georgia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Georgia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Georgia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Hawaii
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Hawaii
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Hawaii
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Hawaii
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Hawaii
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Hawaii
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Hawaii
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Idaho
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
1-81

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Idaho
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Idaho
30-39.99
34.0
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
Idaho
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Idaho
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Idaho
80-99.99
85.1
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
Idaho
100 <
145.0
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Illinois
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Illinois
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Illinois
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Illinois
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Illinois
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Illinois
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Illinois
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Indiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Indiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Indiana
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Indiana
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Indiana
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Indiana
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Indiana
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-82

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Iowa
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Iowa
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Iowa
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Iowa
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Iowa
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Iowa
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Iowa
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kansas
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Kansas
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Kansas
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Kansas
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Kansas
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kentucky
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kentucky
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kentucky
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
1-83

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Kentucky
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Kentucky
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Kentucky
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Kentucky
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Louisiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Louisiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Louisiana
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Louisiana
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Louisiana
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Louisiana
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Louisiana
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maine
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Maine
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maine
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Maine
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Maine
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Maine
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Maine
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
1-84

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maryland
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Maryland
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maryland
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Maryland
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Maryland
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Maryland
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Maryland
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Massachusetts
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Massachusetts
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Massachusetts
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Massachusetts
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Massachusetts
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Massachusetts
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Massachusetts
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Michigan
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Michigan
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Michigan
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Michigan
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Michigan
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
1-85

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Michigan
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Michigan
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Minnesota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Minnesota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Minnesota
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Minnesota
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Minnesota
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Minnesota
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Minnesota
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Mississippi
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Mississippi
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Mississippi
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Mississippi
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Mississippi
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Mississippi
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Mississippi
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-86

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Missouri
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Missouri
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Missouri
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Missouri
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Missouri
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Missouri
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Missouri
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Montana
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Montana
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Montana
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
Montana
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Montana
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Montana
80-99.99
85.1
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
Montana
100 <
145.0
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Nebraska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Nebraska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Nebraska
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Nebraska
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Nebraska
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Nebraska
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Nebraska
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
1-87

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
Nevada
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
Nevada
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Nevada
30-39.99
34.0
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
$4,969
Nevada
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Nevada
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Nevada
80-99.99
85.1
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
$8,664
Nevada
100 <
145.0
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
$11,460
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New
Hampshire
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New
Hampshire
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New
Hampshire
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
New
Hampshire
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
New
Hampshire
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
New
Hampshire
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New
Hampshire
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-88

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Jersey
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New Jersey
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New Jersey
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
New Jersey
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
New Jersey
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
New Jersey
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New Jersey
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Mexico
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
New Mexico
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
New Mexico
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
New Mexico
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
New Mexico
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
New Mexico
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New Mexico
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New York
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New York
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New York
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
New York
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
1-89

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New York
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
New York
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
New York
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
North Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
North Carolina
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
North Carolina
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
North Carolina
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
North Carolina
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
North Carolina
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Dakota
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
North Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
North Dakota
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
North Dakota
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
North Dakota
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
North Dakota
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
North Dakota
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-90

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Ohio
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Ohio
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Ohio
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Ohio
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Ohio
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Ohio
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Ohio
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Ohio
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oklahoma
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oklahoma
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oklahoma
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Oklahoma
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Oklahoma
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Oklahoma
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Oklahoma
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oregon
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oregon
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oregon
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oregon
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Oregon
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Oregon
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Oregon
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
1-91

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Pennsylvania
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Pennsylvania
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Pennsylvania
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Pennsylvania
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Pennsylvania
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Pennsylvania
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Pennsylvania
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Rhode Island
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Rhode Island
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Rhode Island
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Rhode Island
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Rhode Island
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Rhode Island
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Rhode Island
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
1-92

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Carolina
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
South Carolina
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
South Carolina
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
South Carolina
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
South Carolina
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Dakota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
South Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Dakota
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
South Dakota
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
South Dakota
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
South Dakota
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
South Dakota
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Tennessee
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Tennessee
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Tennessee
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Tennessee
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Tennessee
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Tennessee
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Tennessee
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-93

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Texas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Texas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Texas
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Texas
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Texas
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Texas
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Texas
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Utah
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Utah
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Utah
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
Utah
40-59.99
46.0
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
$6,001
Utah
60-79.99
69.0
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
$8,339
Utah
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Utah
100 <
145.0
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
$14,032
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Vermont
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Vermont
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Vermont
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Vermont
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
1-94

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Vermont
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Vermont
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Virginia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Virginia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Virginia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Virginia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Virginia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Washington
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Washington
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Washington
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Washington
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Washington
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Washington
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Washington
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-95

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
West Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
West Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
West Virginia
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
West Virginia
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
West Virginia
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
West Virginia
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
West Virginia
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wisconsin
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Wisconsin
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wisconsin
30-39.99
34.0
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
$6,949
Wisconsin
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Wisconsin
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Wisconsin
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Wisconsin
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wyoming
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Wyoming
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wyoming
30-39.99
34.0
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
$5,663
Wyoming
40-59.99
46.0
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
$7,287
Wyoming
60-79.99
69.0
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
$10,268
Wyoming
80-99.99
85.1
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
$10,593
Wyoming
100 <
145.0
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
$17,792
1-96

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Alabama
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Alabama
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Alabama
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Alabama
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Alabama
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Alabama
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Alabama
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Alaska
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Alaska
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Alaska
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Alaska
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Alaska
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Alaska
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Alaska
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Arizona
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Arizona
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
1-97

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
30-39.99
34.0
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
Arizona
40-59.99
46.0
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
Arizona
60-79.99
69.0
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
Arizona
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Arizona
100 <
145.0
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Arkansas
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Arkansas
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Arkansas
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Arkansas
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Arkansas
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Arkansas
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Arkansas
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
California
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
California
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
California
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
California
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
California
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
California
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
California
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-98

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Colorado
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Colorado
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Colorado
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Colorado
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Colorado
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Colorado
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Colorado
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Connecticut
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Connecticut
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Connecticut
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Connecticut
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Connecticut
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Connecticut
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Connecticut
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Delaware
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Delaware
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Delaware
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Delaware
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Delaware
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
1-99

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Delaware
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Delaware
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
District of
Columbia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
District of
Columbia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
District of
Columbia
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
District of
Columbia
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
District of
Columbia
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
District of
Columbia
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
District of
Columbia
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Florida
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Florida
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Florida
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Florida
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Florida
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Florida
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Florida
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-100

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Georgia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Georgia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Georgia
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Georgia
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Georgia
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Georgia
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Georgia
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Hawaii
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Hawaii
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Hawaii
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Hawaii
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Hawaii
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Hawaii
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Hawaii
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Idaho
15-19.99
17.0
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
Idaho
20-29.99
23.0
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
Idaho
30-39.99
34.0
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
Idaho
40-59.99
46.0
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
1-101

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Idaho
60-79.99
69.0
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
Idaho
80-99.99
85.1
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
Idaho
100 <
145.0
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Illinois
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Illinois
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Illinois
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Illinois
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Illinois
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Illinois
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Illinois
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Indiana
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Indiana
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Indiana
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Indiana
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Indiana
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Indiana
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Indiana
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-102

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Iowa
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Iowa
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Iowa
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Iowa
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Iowa
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Iowa
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Iowa
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Kansas
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Kansas
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Kansas
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Kansas
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Kansas
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Kansas
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Kansas
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Kentucky
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Kentucky
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Kentucky
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Kentucky
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Kentucky
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Kentucky
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
1-103

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Kentucky
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Louisiana
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Louisiana
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Louisiana
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Louisiana
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Louisiana
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Louisiana
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Louisiana
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Maine
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Maine
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Maine
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Maine
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Maine
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Maine
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Maine
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Maryland
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
1-104

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Maryland
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Maryland
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Maryland
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Maryland
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Maryland
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Maryland
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Massachusetts
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Massachusetts
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Massachusetts
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Massachusetts
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Massachusetts
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Massachusetts
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Massachusetts
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Michigan
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Michigan
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Michigan
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Michigan
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Michigan
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Michigan
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Michigan
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-105

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Minnesota
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Minnesota
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Minnesota
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Minnesota
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Minnesota
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Minnesota
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Minnesota
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Mississippi
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Mississippi
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Mississippi
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Mississippi
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Mississippi
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Mississippi
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Mississippi
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Missouri
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missouri
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missouri
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missouri
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missouri
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Missouri
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Missouri
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Missouri
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Missouri
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
1-106

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Missouri
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Missouri
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Missouri
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Montana
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Montana
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
Montana
30-39.99
34.0
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
Montana
40-59.99
46.0
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
Montana
60-79.99
69.0
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
Montana
80-99.99
85.1
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
Montana
100 <
145.0
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Nebraska
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Nebraska
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Nebraska
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Nebraska
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Nebraska
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Nebraska
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Nebraska
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-107

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Nevada
10-14.99
12.0
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
Nevada
15-19.99
17.0
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
Nevada
20-29.99
23.0
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
Nevada
30-39.99
34.0
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
$10,769
Nevada
40-59.99
46.0
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
Nevada
60-79.99
69.0
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
Nevada
80-99.99
85.1
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
$19,446
Nevada
100 <
145.0
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
$25,836
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
New
Hampshire
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
New
Hampshire
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
New
Hampshire
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
New
Hampshire
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
New
Hampshire
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
New
Hampshire
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
New
Hampshire
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
New Jersey
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
New Jersey
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
1-108

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Jersey
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
New Jersey
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
New Jersey
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
New Jersey
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
New Jersey
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
New Mexico
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
New Mexico
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
New Mexico
30-39.99
34.0
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
New Mexico
40-59.99
46.0
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
New Mexico
60-79.99
69.0
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
New Mexico
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
New Mexico
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
New York
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
New York
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
New York
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
New York
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
New York
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
New York
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
New York
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-109

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
North Carolina
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
North Carolina
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
North Carolina
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
North Carolina
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
North Carolina
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
North Carolina
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
North Carolina
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
North Dakota
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
North Dakota
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
North Dakota
30-39.99
34.0
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
North Dakota
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
North Dakota
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
North Dakota
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
North Dakota
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Ohio
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Ohio
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Ohio
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Ohio
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Ohio
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
1-110

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Ohio
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Ohio
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Oklahoma
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Oklahoma
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Oklahoma
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Oklahoma
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Oklahoma
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Oklahoma
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Oklahoma
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oregon
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Oregon
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Oregon
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Oregon
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Oregon
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Oregon
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Oregon
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Oregon
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
1-111

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Pennsylvania
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Pennsylvania
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Pennsylvania
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Pennsylvania
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Pennsylvania
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Pennsylvania
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Pennsylvania
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Rhode Island
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Rhode Island
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Rhode Island
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Rhode Island
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Rhode Island
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Rhode Island
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Rhode Island
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
South Carolina
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
South Carolina
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
South Carolina
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
South Carolina
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
South Carolina
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
South Carolina
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
South Carolina
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
1-112

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
South Dakota
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
South Dakota
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
South Dakota
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
South Dakota
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
South Dakota
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
South Dakota
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
South Dakota
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Tennessee
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Tennessee
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Tennessee
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Tennessee
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Tennessee
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Tennessee
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Tennessee
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Texas
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Texas
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Texas
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
1-113

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Texas
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Texas
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Texas
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Texas
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Utah
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Utah
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
Utah
30-39.99
34.0
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
Utah
40-59.99
46.0
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
$13,189
Utah
60-79.99
69.0
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
$19,121
Utah
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Utah
100 <
145.0
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
$33,552
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Vermont
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Vermont
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Vermont
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Vermont
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Vermont
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Vermont
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Vermont
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
1-114

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Virginia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Virginia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Virginia
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Virginia
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Virginia
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Virginia
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Virginia
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Washington
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Washington
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Washington
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Washington
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Washington
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Washington
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Washington
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
West Virginia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
West Virginia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
West Virginia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
West Virginia
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
West Virginia
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
West Virginia
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
West Virginia
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
1-115

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 1 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Wisconsin
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Wisconsin
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Wisconsin
30-39.99
34.0
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
$16,709
Wisconsin
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Wisconsin
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Wisconsin
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Wisconsin
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Wyoming
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Wyoming
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Wyoming
30-39.99
34.0
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
$12,851
Wyoming
40-59.99
46.0
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
$17,047
Wyoming
60-79.99
69.0
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
$24,908
Wyoming
80-99.99
85.1
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
$25,233
Wyoming
100 <
145.0
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
$44,832
1-116

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alabama
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alabama
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alabama
30-39.99
34.0
$301,621
$335,830
$404,248
$472,666
$541,084
$609,502
$712,129
$780,547
$814,756
$985,801
$1,156,846
$1,293,682
Alabama
40-59.99
46.0
$382,444
$418,566
$490,810
$563,054
$635,298
$707,542
$815,908
$888,152
$924,274
$1,104,884
$1,285,494
$1,429,982
Alabama
60-79.99
69.0
$572,096
$626,833
$736,307
$845,781
$955,255
$1,064,729
$1,228,940
$1,338,414
$1,393,151
$1,666,836
$1,940,521
$2,159,469
Alabama
80-99.99
85.1
$712,538
$782,054
$921,086
$1,060,118
$1,199,150
$1,338,182
$1,546,730
$1,685,762
$1,755,278
$2,102,858
$2,450,438
$2,728,502
Alabama
100 <
145.0
$1,191,406
$1,302,064
$1,523,380
$1,744,696
$1,966,012
$2,187,328
$2,519,302
$2,740,618
$2,851,276
$3,404,566
$3,957,856
$4,400,488
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alaska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alaska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alaska
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Alaska
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Alaska
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Alaska
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Alaska
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Arizona
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Arizona
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
1-117

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
30-39.99
34.0
$40,503
$56,964
$89,886
$122,808
$155,730
$188,652
$238,035
$270,957
$287,418
$369,723
$452,028
$517,872
Arizona
40-59.99
46.0
$40,976
$57,910
$91,778
$125,646
$159,514
$193,382
$244,184
$278,052
$294,986
$379,656
$464,326
$532,062
Arizona
60-79.99
69.0
$41,738
$59,434
$94,826
$130,218
$165,610
$201,002
$254,090
$289,482
$307,178
$395,658
$484,138
$554,922
Arizona
80-99.99
85.1
$42,272
$60,502
$96,962
$133,422
$169,882
$206,342
$261,032
$297,492
$315,722
$406,872
$498,022
$570,942
Arizona
100 <
145.0
$83,708
$119,332
$190,580
$261,828
$333,076
$404,324
$511,196
$582,444
$618,068
$796,188
$974,308
$1,116,804
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Arkansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Arkansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Arkansas
30-39.99
34.0
$247,380
$281,442
$349,566
$417,690
$485,814
$553,938
$656,124
$724,248
$758,310
$928,620
$1,098,930
$1,235,178
Arkansas
40-59.99
46.0
$309,059
$344,982
$416,828
$488,674
$560,520
$632,366
$740,135
$811,981
$847,904
$1,027,519
$1,207,134
$1,350,826
Arkansas
60-79.99
69.0
$461,977
$516,375
$625,171
$733,967
$842,763
$951,559
$1,114,753
$1,223,549
$1,277,947
$1,549,937
$1,821,927
$2,039,519
Arkansas
80-99.99
85.1
$576,549
$645,472
$783,318
$921,164
$1,059,010
$1,196,856
$1,403,625
$1,541,471
$1,610,394
$1,955,009
$2,299,624
$2,575,316
Arkansas
100 <
145.0
$960,000
$1,069,948
$1,289,844
$1,509,740
$1,729,636
$1,949,532
$2,279,376
$2,499,272
$2,609,220
$3,158,960
$3,708,700
$4,148,492
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
California
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
California
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
California
30-39.99
34.0
$53,522
$71,609
$107,783
$143,957
$180,131
$216,305
$270,566
$306,740
$324,827
$415,262
$505,697
$578,045
California
40-59.99
46.0
$58,489
$77,521
$115,585
$153,649
$191,713
$229,777
$286,873
$324,937
$343,969
$439,129
$534,289
$610,417
California
60-79.99
69.0
$68,083
$89,002
$130,840
$172,678
$214,516
$256,354
$319,111
$360,949
$381,868
$486,463
$591,058
$674,734
California
80-99.99
85.1
$106,250
$140,149
$207,947
$275,745
$343,543
$411,341
$513,038
$580,836
$614,735
$784,230
$953,725
$1,089,321
California
100 <
145.0
$139,064
$181,454
$266,234
$351,014
$435,794
$520,574
$647,744
$732,524
$774,914
$986,864
$1,198,814
$1,368,374
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-118

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Colorado
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Colorado
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Colorado
30-39.99
34.0
$83,542
$100,889
$135,583
$170,277
$204,971
$239,665
$291,706
$326,400
$343,747
$430,482
$517,217
$586,605
Colorado
40-59.99
46.0
$99,103
$117,134
$153,196
$189,258
$225,320
$261,382
$315,475
$351,537
$369,568
$459,723
$549,878
$622,002
Colorado
60-79.99
69.0
$128,930
$148,272
$186,956
$225,640
$264,324
$303,008
$361,034
$399,718
$419,060
$515,770
$612,480
$689,848
Colorado
80-99.99
85.1
$181,924
$214,508
$279,676
$344,844
$410,012
$475,180
$572,932
$638,100
$670,684
$833,604
$996,524
$1,126,860
Colorado
100 <
145.0
$266,936
$306,018
$384,182
$462,346
$540,510
$618,674
$735,920
$814,084
$853,166
$1,048,576
$1,243,986
$1,400,314
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Connecticut
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Connecticut
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Connecticut
30-39.99
34.0
$122,986
$144,937
$188,839
$232,741
$276,643
$320,545
$386,398
$430,300
$452,251
$562,006
$671,761
$759,565
Connecticut
40-59.99
46.0
$183,353
$218,704
$289,406
$360,108
$430,810
$501,512
$607,565
$678,267
$713,618
$890,373
$1,067,128
$1,208,532
Connecticut
60-79.99
69.0
$238,664
$277,243
$354,401
$431,559
$508,717
$585,875
$701,612
$778,770
$817,349
$1,010,244
$1,203,139
$1,357,455
Connecticut
80-99.99
85.1
$312,440
$368,544
$480,752
$592,960
$705,168
$817,376
$985,688
$1,097,896
$1,154,000
$1,434,520
$1,715,040
$1,939,456
Connecticut
100 <
145.0
$494,126
$572,230
$728,438
$884,646
$1,040,854
$1,197,062
$1,431,374
$1,587,582
$1,665,686
$2,056,206
$2,446,726
$2,759,142
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Delaware
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Delaware
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Delaware
30-39.99
34.0
$132,713
$154,462
$197,960
$241,458
$284,956
$328,454
$393,701
$437,199
$458,948
$567,693
$676,438
$763,434
Delaware
40-59.99
46.0
$196,591
$231,747
$302,059
$372,371
$442,683
$512,995
$618,463
$688,775
$723,931
$899,711
$1,075,491
$1,216,115
Delaware
60-79.99
69.0
$258,523
$296,811
$373,387
$449,963
$526,539
$603,115
$717,979
$794,555
$832,843
$1,024,283
$1,215,723
$1,368,875
1-119

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Delaware
80-99.99
85.1
$336,882
$392,577
$503,967
$615,357
$726,747
$838,137
$1,005,222
$1,116,612
$1,172,307
$1,450,782
$1,729,257
$1,952,037
Delaware
100 <
145.0
$535,856
$613,346
$768,326
$923,306
$1,078,286
$1,233,266
$1,465,736
$1,620,716
$1,698,206
$2,085,656
$2,473,106
$2,783,066
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
District of
Columbia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
District of
Columbia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
District of
Columbia
30-39.99
34.0
$129,530
$151,092
$194,216
$237,340
$280,464
$323,588
$388,274
$431,398
$452,960
$560,770
$668,580
$754,828
District of
Columbia
40-59.99
46.0
$192,358
$227,335
$297,289
$367,243
$437,197
$507,151
$612,082
$682,036
$717,013
$891,898
$1,066,783
$1,206,691
District of
Columbia
60-79.99
69.0
$252,173
$290,192
$366,230
$442,268
$518,306
$594,344
$708,401
$784,439
$822,458
$1,012,553
$1,202,648
$1,354,724
District of
Columbia
80-99.99
85.1
$329,005
$384,323
$494,959
$605,595
$716,231
$826,867
$992,821
$1,103,457
$1,158,775
$1,435,365
$1,711,955
$1,933,227
District of
Columbia
100 <
145.0
$522,512
$599,438
$753,290
$907,142
$1,060,994
$1,214,846
$1,445,624
$1,599,476
$1,676,402
$2,061,032
$2,445,662
$2,753,366
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Florida
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Florida
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Florida
30-39.99
34.0
$298,010
$333,684
$405,032
$476,380
$547,728
$619,076
$726,098
$797,446
$833,120
$1,011,490
$1,189,860
$1,332,556
Florida
40-59.99
46.0
$411,975
$464,703
$570,159
$675,615
$781,071
$886,527
$1,044,711
$1,150,167
$1,202,895
$1,466,535
$1,730,175
$1,941,087
Florida
60-79.99
69.0
$596,686
$666,523
$806,197
$945,871
$1,085,545
$1,225,219
$1,434,730
$1,574,404
$1,644,241
$1,993,426
$2,342,611
$2,621,959
Florida
80-99.99
85.1
$703,187
$776,058
$921,800
$1,067,542
$1,213,284
$1,359,026
$1,577,639
$1,723,381
$1,796,252
$2,160,607
$2,524,962
$2,816,446
Florida
100 <
145.0
$1,239,676
$1,380,668
$1,662,652
$1,944,636
$2,226,620
$2,508,604
$2,931,580
$3,213,564
$3,354,556
$4,059,516
$4,764,476
$5,328,444
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-120

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Georgia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Georgia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Georgia
30-39.99
34.0
$239,665
$274,062
$342,856
$411,650
$480,444
$549,238
$652,429
$721,223
$755,620
$927,605
$1,099,590
$1,237,178
Georgia
40-59.99
46.0
$298,620
$334,996
$407,748
$480,500
$553,252
$626,004
$735,132
$807,884
$844,260
$1,026,140
$1,208,020
$1,353,524
Georgia
60-79.99
69.0
$446,411
$501,581
$611,921
$722,261
$832,601
$942,941
$1,108,451
$1,218,791
$1,273,961
$1,549,811
$1,825,661
$2,046,341
Georgia
80-99.99
85.1
$525,682
$583,679
$699,673
$815,667
$931,661
$1,047,655
$1,221,646
$1,337,640
$1,395,637
$1,685,622
$1,975,607
$2,207,595
Georgia
100 <
145.0
$927,286
$1,038,854
$1,261,990
$1,485,126
$1,708,262
$1,931,398
$2,266,102
$2,489,238
$2,600,806
$3,158,646
$3,716,486
$4,162,758
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Hawaii
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Hawaii
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Hawaii
30-39.99
34.0
$281,995
$312,902
$374,716
$436,530
$498,344
$560,158
$652,879
$714,693
$745,600
$900,135
$1,054,670
$1,178,298
Hawaii
40-59.99
46.0
$389,635
$435,242
$526,456
$617,670
$708,884
$800,098
$936,919
$1,028,133
$1,073,740
$1,301,775
$1,529,810
$1,712,238
Hawaii
60-79.99
69.0
$564,242
$624,462
$744,902
$865,342
$985,782
$1,106,222
$1,286,882
$1,407,322
$1,467,542
$1,768,642
$2,069,742
$2,310,622
Hawaii
80-99.99
85.1
$663,502
$724,842
$847,522
$970,202
$1,092,882
$1,215,562
$1,399,582
$1,522,262
$1,583,602
$1,890,302
$2,197,002
$2,442,362
Hawaii
100 <
145.0
$1,171,542
$1,292,372
$1,534,032
$1,775,692
$2,017,352
$2,259,012
$2,621,502
$2,863,162
$2,983,992
$3,588,142
$4,192,292
$4,675,612
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Idaho
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
Idaho
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Idaho
30-39.99
34.0
$25,552
$41,712
$74,032
$106,352
$138,672
$170,992
$219,472
$251,792
$267,952
$348,752
$429,552
$494,192
Idaho
40-59.99
46.0
$41,684
$59,326
$94,610
$129,894
$165,178
$200,462
$253,388
$288,672
$306,314
$394,524
$482,734
$553,302
1-121

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Idaho
60-79.99
69.0
$42,801
$61,560
$99,078
$136,596
$174,114
$211,632
$267,909
$305,427
$324,186
$417,981
$511,776
$586,812
Idaho
80-99.99
85.1
$43,582
$63,122
$102,202
$141,282
$180,362
$219,442
$278,062
$317,142
$336,682
$434,382
$532,082
$610,242
Idaho
100 <
145.0
$85,940
$123,796
$199,508
$275,220
$350,932
$426,644
$540,212
$615,924
$653,780
$843,060
$1,032,340
$1,183,764
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Illinois
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Illinois
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Illinois
30-39.99
34.0
$111,224
$131,520
$172,112
$212,704
$253,296
$293,888
$354,776
$395,368
$415,664
$517,144
$618,624
$699,808
Illinois
40-59.99
46.0
$168,087
$201,848
$269,370
$336,892
$404,414
$471,936
$573,219
$640,741
$674,502
$843,307
$1,012,112
$1,147,156
Illinois
60-79.99
69.0
$215,769
$251,965
$324,357
$396,749
$469,141
$541,533
$650,121
$722,513
$758,709
$939,689
$1,120,669
$1,265,453
Illinois
80-99.99
85.1
$249,057
$286,869
$362,493
$438,117
$513,741
$589,365
$702,801
$778,425
$816,237
$1,005,297
$1,194,357
$1,345,605
Illinois
100 <
145.0
$446,010
$519,104
$665,292
$811,480
$957,668
$1,103,856
$1,323,138
$1,469,326
$1,542,420
$1,907,890
$2,273,360
$2,565,736
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Indiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Indiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Indiana
30-39.99
34.0
$160,873
$182,136
$224,662
$267,188
$309,714
$352,240
$416,029
$458,555
$479,818
$586,133
$692,448
$777,500
Indiana
40-59.99
46.0
$234,881
$269,571
$338,951
$408,331
$477,711
$547,091
$651,161
$720,541
$755,231
$928,681
$1,102,131
$1,240,891
Indiana
60-79.99
69.0
$315,958
$353,546
$428,722
$503,898
$579,074
$654,250
$767,014
$842,190
$879,778
$1,067,718
$1,255,658
$1,406,010
Indiana
80-99.99
85.1
$407,601
$462,315
$571,743
$681,171
$790,599
$900,027
$1,064,169
$1,173,597
$1,228,311
$1,501,881
$1,775,451
$1,994,307
Indiana
100 <
145.0
$656,554
$732,574
$884,614
$1,036,654
$1,188,694
$1,340,734
$1,568,794
$1,720,834
$1,796,854
$2,176,954
$2,557,054
$2,861,134
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-122

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Iowa
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Iowa
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Iowa
30-39.99
34.0
$132,155
$152,250
$192,440
$232,630
$272,820
$313,010
$373,295
$413,485
$433,580
$534,055
$634,530
$714,910
Iowa
40-59.99
46.0
$196,485
$230,053
$297,189
$364,325
$431,461
$498,597
$599,301
$666,437
$700,005
$867,845
$1,035,685
$1,169,957
Iowa
60-79.99
69.0
$258,365
$294,271
$366,083
$437,895
$509,707
$581,519
$689,237
$761,049
$796,955
$976,485
$1,156,015
$1,299,639
Iowa
80-99.99
85.1
$336,112
$388,294
$492,658
$597,022
$701,386
$805,750
$962,296
$1,066,660
$1,118,842
$1,379,752
$1,640,662
$1,849,390
Iowa
100 <
145.0
$535,526
$608,012
$752,984
$897,956
$1,042,928
$1,187,900
$1,405,358
$1,550,330
$1,622,816
$1,985,246
$2,347,676
$2,637,620
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kansas
30-39.99
34.0
$150,798
$171,624
$213,276
$254,928
$296,580
$338,232
$400,710
$442,362
$463,188
$567,318
$671,448
$754,752
Kansas
40-59.99
46.0
$221,421
$255,691
$324,231
$392,771
$461,311
$529,851
$632,661
$701,201
$735,471
$906,821
$1,078,171
$1,215,251
Kansas
60-79.99
69.0
$295,769
$332,728
$406,646
$480,564
$554,482
$628,400
$739,277
$813,195
$850,154
$1,034,949
$1,219,744
$1,367,580
Kansas
80-99.99
85.1
$382,596
$436,429
$544,095
$651,761
$759,427
$867,093
$1,028,592
$1,136,258
$1,190,091
$1,459,256
$1,728,421
$1,943,753
Kansas
100 <
145.0
$683,138
$787,262
$995,510
$1,203,758
$1,412,006
$1,620,254
$1,932,626
$2,140,874
$2,244,998
$2,765,618
$3,286,238
$3,702,734
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kentucky
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kentucky
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kentucky
30-39.99
34.0
$122,202
$144,241
$188,319
$232,397
$276,475
$320,553
$386,670
$430,748
$452,787
$562,982
$673,177
$761,333
Kentucky
40-59.99
46.0
$182,256
$217,690
$288,558
$359,426
$430,294
$501,162
$607,464
$678,332
$713,766
$890,936
$1,068,106
$1,209,842
Kentucky
60-79.99
69.0
$237,020
$275,725
$353,135
$430,545
$507,955
$585,365
$701,480
$778,890
$817,595
$1,011,120
$1,204,645
$1,359,465
Kentucky
80-99.99
85.1
$310,433
$366,713
$479,273
$591,833
$704,393
$816,953
$985,793
$1,098,353
$1,154,633
$1,436,033
$1,717,433
$1,942,553
1-123

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Kentucky
100 <
145.0
$490,670
$569,038
$725,774
$882,510
$1,039,246
$1,195,982
$1,431,086
$1,587,822
$1,666,190
$2,058,030
$2,449,870
$2,763,342
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Louisiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Louisiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Louisiana
30-39.99
34.0
$348,247
$383,462
$453,892
$524,322
$594,752
$665,182
$770,827
$841,257
$876,472
$1,052,547
$1,228,622
$1,369,482
Louisiana
40-59.99
46.0
$480,047
$532,260
$636,686
$741,112
$845,538
$949,964
$1,106,603
$1,211,029
$1,263,242
$1,524,307
$1,785,372
$1,994,224
Louisiana
60-79.99
69.0
$698,664
$767,597
$905,463
$1,043,329
$1,181,195
$1,319,061
$1,525,860
$1,663,726
$1,732,659
$2,077,324
$2,421,989
$2,697,721
Louisiana
80-99.99
85.1
$863,783
$950,570
$1,124,144
$1,297,718
$1,471,292
$1,644,866
$1,905,227
$2,078,801
$2,165,588
$2,599,523
$3,033,458
$3,380,606
Louisiana
100 <
145.0
$1,454,450
$1,594,016
$1,873,148
$2,152,280
$2,431,412
$2,710,544
$3,129,242
$3,408,374
$3,547,940
$4,245,770
$4,943,600
$5,501,864
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maine
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Maine
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maine
30-39.99
34.0
$115,900
$137,451
$180,553
$223,655
$266,757
$309,859
$374,512
$417,614
$439,165
$546,920
$654,675
$740,879
Maine
40-59.99
46.0
$173,921
$208,887
$278,819
$348,751
$418,683
$488,615
$593,513
$663,445
$698,411
$873,241
$1,048,071
$1,187,935
Maine
60-79.99
69.0
$224,519
$262,522
$338,528
$414,534
$490,540
$566,546
$680,555
$756,561
$794,564
$984,579
$1,174,594
$1,326,606
Maine
80-99.99
85.1
$259,975
$300,141
$380,473
$460,805
$541,137
$621,469
$741,967
$822,299
$862,465
$1,063,295
$1,264,125
$1,424,789
Maine
100 <
145.0
$464,400
$541,292
$695,076
$848,860
$1,002,644
$1,156,428
$1,387,104
$1,540,888
$1,617,780
$2,002,240
$2,386,700
$2,694,268
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maryland
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
1-124

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Maryland
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maryland
30-39.99
34.0
$129,609
$151,250
$194,532
$237,814
$281,096
$324,378
$389,301
$432,583
$454,224
$562,429
$670,634
$757,198
Maryland
40-59.99
46.0
$192,434
$227,487
$297,593
$367,699
$437,805
$507,911
$613,070
$683,176
$718,229
$893,494
$1,068,759
$1,208,971
Maryland
60-79.99
69.0
$252,287
$290,420
$366,686
$442,952
$519,218
$595,484
$709,883
$786,149
$824,282
$1,014,947
$1,205,612
$1,358,144
Maryland
80-99.99
85.1
$329,165
$384,643
$495,599
$606,555
$717,511
$828,467
$994,901
$1,105,857
$1,161,335
$1,438,725
$1,716,115
$1,938,027
Maryland
100 <
145.0
$522,750
$599,914
$754,242
$908,570
$1,062,898
$1,217,226
$1,448,718
$1,603,046
$1,680,210
$2,066,030
$2,451,850
$2,760,506
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Massachusetts
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Massachusetts
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Massachusetts
30-39.99
34.0
$121,219
$142,878
$186,196
$229,514
$272,832
$316,150
$381,127
$424,445
$446,104
$554,399
$662,694
$749,330
Massachusetts
40-59.99
46.0
$181,075
$216,145
$286,285
$356,425
$426,565
$496,705
$601,915
$672,055
$707,125
$882,475
$1,057,825
$1,198,105
Massachusetts
60-79.99
69.0
$235,248
$273,406
$349,722
$426,038
$502,354
$578,670
$693,144
$769,460
$807,618
$998,408
$1,189,198
$1,341,830
Massachusetts
80-99.99
85.1
$308,155
$363,668
$474,694
$585,720
$696,746
$807,772
$974,311
$1,085,337
$1,140,850
$1,418,415
$1,695,980
$1,918,032
Massachusetts
100 <
145.0
$486,946
$564,164
$718,600
$873,036
$1,027,472
$1,181,908
$1,413,562
$1,567,998
$1,645,216
$2,031,306
$2,417,396
$2,726,268
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Michigan
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Michigan
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Michigan
30-39.99
34.0
$64,658
$84,477
$124,115
$163,753
$203,391
$243,029
$302,486
$342,124
$361,943
$461,038
$560,133
$639,409
Michigan
40-59.99
46.0
$73,629
$95,079
$137,979
$180,879
$223,779
$266,679
$331,029
$373,929
$395,379
$502,629
$609,879
$695,679
Michigan
60-79.99
69.0
$121,657
$157,274
$228,508
$299,742
$370,976
$442,210
$549,061
$620,295
$655,912
$833,997
$1,012,082
$1,154,550
Michigan
80-99.99
85.1
$132,986
$170,084
$244,280
$318,476
$392,672
$466,868
$578,162
$652,358
$689,456
$874,946
$1,060,436
$1,208,828
Michigan
100 <
145.0
$248,238
$320,116
$463,872
$607,628
$751,384
$895,140
$1,110,774
$1,254,530
$1,326,408
$1,685,798
$2,045,188
$2,332,700
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-125

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Minnesota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Minnesota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Minnesota
30-39.99
34.0
$102,831
$122,427
$161,619
$200,811
$240,003
$279,195
$337,983
$377,175
$396,771
$494,751
$592,731
$671,115
Minnesota
40-59.99
46.0
$125,276
$146,425
$188,723
$231,021
$273,319
$315,617
$379,064
$421,362
$442,511
$548,256
$654,001
$738,597
Minnesota
60-79.99
69.0
$199,133
$234,305
$304,649
$374,993
$445,337
$515,681
$621,197
$691,541
$726,713
$902,573
$1,078,433
$1,219,121
Minnesota
80-99.99
85.1
$228,694
$265,397
$338,803
$412,209
$485,615
$559,021
$669,130
$742,536
$779,239
$962,754
$1,146,269
$1,293,081
Minnesota
100 <
145.0
$411,312
$482,516
$624,924
$767,332
$909,740
$1,052,148
$1,265,760
$1,408,168
$1,479,372
$1,835,392
$2,191,412
$2,476,228
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Mississippi
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Mississippi
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Mississippi
30-39.99
34.0
$269,529
$304,093
$373,221
$442,349
$511,477
$580,605
$684,297
$753,425
$787,989
$960,809
$1,133,629
$1,271,885
Mississippi
40-59.99
46.0
$339,026
$375,629
$448,835
$522,041
$595,247
$668,453
$778,262
$851,468
$888,071
$1,071,086
$1,254,101
$1,400,513
Mississippi
60-79.99
69.0
$507,065
$562,621
$673,733
$784,845
$895,957
$1,007,069
$1,173,737
$1,284,849
$1,340,405
$1,618,185
$1,895,965
$2,118,189
Mississippi
80-99.99
85.1
$632,212
$702,617
$843,427
$984,237
$1,125,047
$1,265,857
$1,477,072
$1,617,882
$1,688,287
$2,040,312
$2,392,337
$2,673,957
Mississippi
100 <
145.0
$1,118,294
$1,254,636
$1,527,320
$1,800,004
$2,072,688
$2,345,372
$2,754,398
$3,027,082
$3,163,424
$3,845,134
$4,526,844
$5,072,212
Missouri
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missouri
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missouri
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missouri
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missouri
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Missouri
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Missouri
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Missouri
30-39.99
34.0
$188,001
$220,938
$286,812
$352,686
$418,560
$484,434
$583,245
$649,119
$682,056
$846,741
$1,011,426
$1,143,174
Missouri
40-59.99
46.0
$228,598
$262,874
$331,426
$399,978
$468,530
$537,082
$639,910
$708,462
$742,738
$914,118
$1,085,498
$1,222,602
1-126

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Missouri
60-79.99
69.0
$340,986
$392,614
$495,870
$599,126
$702,382
$805,638
$960,522
$1,063,778
$1,115,406
$1,373,546
$1,631,686
$1,838,198
Missouri
80-99.99
85.1
$395,873
$449,718
$557,408
$665,098
$772,788
$880,478
$1,042,013
$1,149,703
$1,203,548
$1,472,773
$1,741,998
$1,957,378
Missouri
100 <
145.0
$705,760
$809,904
$1,018,192
$1,226,480
$1,434,768
$1,643,056
$1,955,488
$2,163,776
$2,267,920
$2,788,640
$3,309,360
$3,725,936
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Montana
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Montana
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Montana
30-39.99
34.0
$44,476
$61,600
$95,848
$130,096
$164,344
$198,592
$249,964
$284,212
$301,336
$386,956
$472,576
$541,072
Montana
40-59.99
46.0
$46,250
$63,980
$99,440
$134,900
$170,360
$205,820
$259,010
$294,470
$312,200
$400,850
$489,500
$560,420
Montana
60-79.99
69.0
$49,649
$68,539
$106,319
$144,099
$181,879
$219,659
$276,329
$314,109
$332,999
$427,449
$521,899
$597,459
Montana
80-99.99
85.1
$52,028
$71,730
$111,134
$150,538
$189,942
$229,346
$288,452
$327,856
$347,558
$446,068
$544,578
$623,386
Montana
100 <
145.0
$100,332
$138,466
$214,734
$291,002
$367,270
$443,538
$557,940
$634,208
$672,342
$863,012
$1,053,682
$1,206,218
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Nebraska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Nebraska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Nebraska
30-39.99
34.0
$130,340
$149,872
$188,936
$228,000
$267,064
$306,128
$364,724
$403,788
$423,320
$520,980
$618,640
$696,768
Nebraska
40-59.99
46.0
$162,493
$183,555
$225,679
$267,803
$309,927
$352,051
$415,237
$457,361
$478,423
$583,733
$689,043
$773,291
Nebraska
60-79.99
69.0
$254,996
$290,075
$360,233
$430,391
$500,549
$570,707
$675,944
$746,102
$781,181
$956,576
$1,131,971
$1,272,287
Nebraska
80-99.99
85.1
$297,593
$334,182
$407,360
$480,538
$553,716
$626,894
$736,661
$809,839
$846,428
$1,029,373
$1,212,318
$1,358,674
Nebraska
100 <
145.0
$528,458
$599,218
$740,738
$882,258
$1,023,778
$1,165,298
$1,377,578
$1,519,098
$1,589,858
$1,943,658
$2,297,458
$2,580,498
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-127

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Nevada
10-14.99
12.0
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
Nevada
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
Nevada
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Nevada
30-39.99
34.0
$21,467
$33,542
$57,692
$81,842
$105,992
$130,142
$166,367
$190,517
$202,592
$262,967
$323,342
$371,642
Nevada
40-59.99
46.0
$40,128
$56,214
$88,386
$120,558
$152,730
$184,902
$233,160
$265,332
$281,418
$361,848
$442,278
$506,622
Nevada
60-79.99
69.0
$40,505
$56,968
$89,894
$122,820
$155,746
$188,672
$238,061
$270,987
$287,450
$369,765
$452,080
$517,932
Nevada
80-99.99
85.1
$40,768
$57,494
$90,946
$124,398
$157,850
$191,302
$241,480
$274,932
$291,658
$375,288
$458,918
$525,822
Nevada
100 <
145.0
$81,124
$114,164
$180,244
$246,324
$312,404
$378,484
$477,604
$543,684
$576,724
$741,924
$907,124
$1,039,284
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New
Hampshire
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New
Hampshire
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New
Hampshire
30-39.99
34.0
$100,485
$121,827
$164,511
$207,195
$249,879
$292,563
$356,589
$399,273
$420,615
$527,325
$634,035
$719,403
New
Hampshire
40-59.99
46.0
$122,074
$145,558
$192,526
$239,494
$286,462
$333,430
$403,882
$450,850
$474,334
$591,754
$709,174
$803,110
New
Hampshire
60-79.99
69.0
$193,358
$231,060
$306,464
$381,868
$457,272
$532,676
$645,782
$721,186
$758,888
$947,398
$1,135,908
$1,286,716
New
Hampshire
80-99.99
85.1
$221,418
$261,088
$340,428
$419,768
$499,108
$578,448
$697,458
$776,798
$816,468
$1,014,818
$1,213,168
$1,371,848
New
Hampshire
100 <
145.0
$398,914
$475,172
$627,688
$780,204
$932,720
$1,085,236
$1,314,010
$1,466,526
$1,542,784
$1,924,074
$2,305,364
$2,610,396
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Jersey
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New Jersey
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
1-128

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Jersey
30-39.99
34.0
$182,466
$204,793
$249,447
$294,101
$338,755
$383,409
$450,390
$495,044
$517,371
$629,006
$740,641
$829,949
New Jersey
40-59.99
46.0
$263,801
$299,637
$371,309
$442,981
$514,653
$586,325
$693,833
$765,505
$801,341
$980,521
$1,159,701
$1,303,045
New Jersey
60-79.99
69.0
$359,152
$398,273
$476,515
$554,757
$632,999
$711,241
$828,604
$906,846
$945,967
$1,141,572
$1,337,177
$1,493,661
New Jersey
80-99.99
85.1
$461,131
$517,993
$631,717
$745,441
$859,165
$972,889
$1,143,475
$1,257,199
$1,314,061
$1,598,371
$1,882,681
$2,110,129
New Jersey
100 <
145.0
$747,322
$826,562
$985,042
$1,143,522
$1,302,002
$1,460,482
$1,698,202
$1,856,682
$1,935,922
$2,332,122
$2,728,322
$3,045,282
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Mexico
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
New Mexico
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
New Mexico
30-39.99
34.0
$41,702
$59,362
$94,682
$130,002
$165,322
$200,642
$253,622
$288,942
$306,602
$394,902
$483,202
$553,842
New Mexico
40-59.99
46.0
$42,496
$60,950
$97,858
$134,766
$171,674
$208,582
$263,944
$300,852
$319,306
$411,576
$503,846
$577,662
New Mexico
60-79.99
69.0
$44,094
$64,146
$104,250
$144,354
$184,458
$224,562
$284,718
$324,822
$344,874
$445,134
$545,394
$625,602
New Mexico
80-99.99
85.1
$45,160
$66,278
$108,514
$150,750
$192,986
$235,222
$298,576
$340,812
$361,930
$467,520
$573,110
$657,582
New Mexico
100 <
145.0
$88,650
$129,216
$210,348
$291,480
$372,612
$453,744
$575,442
$656,574
$697,140
$899,970
$1,102,800
$1,265,064
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New York
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New York
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New York
30-39.99
34.0
$115,924
$136,783
$178,501
$220,219
$261,937
$303,655
$366,232
$407,950
$428,809
$533,104
$637,399
$720,835
New York
40-59.99
46.0
$174,226
$208,528
$277,132
$345,736
$414,340
$482,944
$585,850
$654,454
$688,756
$860,266
$1,031,776
$1,168,984
New York
60-79.99
69.0
$224,974
$261,980
$335,992
$410,004
$484,016
$558,028
$669,046
$743,058
$780,064
$965,094
$1,150,124
$1,298,148
New York
80-99.99
85.1
$260,412
$299,224
$376,848
$454,472
$532,096
$609,720
$726,156
$803,780
$842,592
$1,036,652
$1,230,712
$1,385,960
New York
100 <
145.0
$465,354
$540,150
$689,742
$839,334
$988,926
$1,138,518
$1,362,906
$1,512,498
$1,587,294
$1,961,274
$2,335,254
$2,634,438
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-129

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
North Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
North Carolina
30-39.99
34.0
$181,867
$203,640
$247,186
$290,732
$334,278
$377,824
$443,143
$486,689
$508,462
$617,327
$726,192
$813,284
North Carolina
40-59.99
46.0
$263,084
$298,263
$368,621
$438,979
$509,337
$579,695
$685,232
$755,590
$790,769
$966,664
$1,142,559
$1,283,275
North Carolina
60-79.99
69.0
$358,262
$396,584
$473,228
$549,872
$626,516
$703,160
$818,126
$894,770
$933,092
$1,124,702
$1,316,312
$1,469,600
North Carolina
80-99.99
85.1
$459,901
$515,645
$627,133
$738,621
$850,109
$961,597
$1,128,829
$1,240,317
$1,296,061
$1,574,781
$1,853,501
$2,076,477
North Carolina
100 <
145.0
$745,456
$823,020
$978,148
$1,133,276
$1,288,404
$1,443,532
$1,676,224
$1,831,352
$1,908,916
$2,296,736
$2,684,556
$2,994,812
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Dakota
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
North Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
North Dakota
30-39.99
34.0
$41,793
$59,544
$95,046
$130,548
$166,050
$201,552
$254,805
$290,307
$308,058
$396,813
$485,568
$556,572
North Dakota
40-59.99
46.0
$42,620
$61,198
$98,354
$135,510
$172,666
$209,822
$265,556
$302,712
$321,290
$414,180
$507,070
$581,382
North Dakota
60-79.99
69.0
$44,280
$64,518
$104,994
$145,470
$185,946
$226,422
$287,136
$327,612
$347,850
$449,040
$550,230
$631,182
North Dakota
80-99.99
85.1
$45,389
$66,736
$109,430
$152,124
$194,818
$237,512
$301,553
$344,247
$365,594
$472,329
$579,064
$664,452
North Dakota
100 <
145.0
$89,042
$130,000
$211,916
$293,832
$375,748
$457,664
$580,538
$662,454
$703,412
$908,202
$1,112,992
$1,276,824
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Ohio
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Ohio
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Ohio
30-39.99
34.0
$144,787
$165,774
$207,748
$249,722
$291,696
$333,670
$396,631
$438,605
$459,592
$564,527
$669,462
$753,410
Ohio
40-59.99
46.0
$182,013
$205,017
$251,025
$297,033
$343,041
$389,049
$458,061
$504,069
$527,073
$642,093
$757,113
$849,129
Ohio
60-79.99
69.0
$283,475
$320,665
$395,045
$469,425
$543,805
$618,185
$729,755
$804,135
$841,325
$1,027,275
$1,213,225
$1,361,985
1-130

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Ohio
80-99.99
85.1
$332,562
$371,601
$449,679
$527,757
$605,835
$683,913
$801,030
$879,108
$918,147
$1,113,342
$1,308,537
$1,464,693
Ohio
100 <
145.0
$588,292
$663,476
$813,844
$964,212
$1,114,580
$1,264,948
$1,490,500
$1,640,868
$1,716,052
$2,091,972
$2,467,892
$2,768,628
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oklahoma
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oklahoma
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oklahoma
30-39.99
34.0
$201,238
$233,771
$298,837
$363,903
$428,969
$494,035
$591,634
$656,700
$689,233
$851,898
$1,014,563
$1,144,695
Oklahoma
40-59.99
46.0
$246,506
$280,235
$347,693
$415,151
$482,609
$550,067
$651,254
$718,712
$752,441
$921,086
$1,089,731
$1,224,647
Oklahoma
60-79.99
69.0
$367,737
$418,433
$519,825
$621,217
$722,609
$824,001
$976,089
$1,077,481
$1,128,177
$1,381,657
$1,635,137
$1,837,921
Oklahoma
80-99.99
85.1
$428,691
$481,211
$586,251
$691,291
$796,331
$901,371
$1,058,931
$1,163,971
$1,216,491
$1,479,091
$1,741,691
$1,951,771
Oklahoma
100 <
145.0
$761,974
$864,158
$1,068,526
$1,272,894
$1,477,262
$1,681,630
$1,988,182
$2,192,550
$2,294,734
$2,805,654
$3,316,574
$3,725,310
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oregon
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oregon
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oregon
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oregon
30-39.99
34.0
$87,833
$109,247
$152,075
$194,903
$237,731
$280,559
$344,801
$387,629
$409,043
$516,113
$623,183
$708,839
Oregon
40-59.99
46.0
$104,956
$128,537
$175,699
$222,861
$270,023
$317,185
$387,928
$435,090
$458,671
$576,576
$694,481
$788,805
Oregon
60-79.99
69.0
$167,639
$205,444
$281,054
$356,664
$432,274
$507,884
$621,299
$696,909
$734,714
$923,739
$1,112,764
$1,263,984
Oregon
80-99.99
85.1
$189,822
$229,744
$309,588
$389,432
$469,276
$549,120
$668,886
$748,730
$788,652
$988,262
$1,187,872
$1,347,560
Oregon
100 <
145.0
$344,868
$421,344
$574,296
$727,248
$880,200
$1,033,152
$1,262,580
$1,415,532
$1,492,008
$1,874,388
$2,256,768
$2,562,672
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-131

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Pennsylvania
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Pennsylvania
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Pennsylvania
30-39.99
34.0
$107,172
$128,716
$171,804
$214,892
$257,980
$301,068
$365,700
$408,788
$430,332
$538,052
$645,772
$731,948
Pennsylvania
40-59.99
46.0
$162,115
$197,074
$266,992
$336,910
$406,828
$476,746
$581,623
$651,541
$686,500
$861,295
$1,036,090
$1,175,926
Pennsylvania
60-79.99
69.0
$206,810
$244,803
$320,789
$396,775
$472,761
$548,747
$662,726
$738,712
$776,705
$966,670
$1,156,635
$1,308,607
Pennsylvania
80-99.99
85.1
$273,053
$328,334
$438,896
$549,458
$660,020
$770,582
$936,425
$1,046,987
$1,102,268
$1,378,673
$1,655,078
$1,876,202
Pennsylvania
100 <
145.0
$427,184
$504,054
$657,794
$811,534
$965,274
$1,119,014
$1,349,624
$1,503,364
$1,580,234
$1,964,584
$2,348,934
$2,656,414
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Rhode Island
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Rhode Island
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Rhode Island
30-39.99
34.0
$167,670
$189,669
$233,667
$277,665
$321,663
$365,661
$431,658
$475,656
$497,655
$607,650
$717,645
$805,641
Rhode Island
40-59.99
46.0
$243,786
$279,182
$349,974
$420,766
$491,558
$562,350
$668,538
$739,330
$774,726
$951,706
$1,128,686
$1,270,270
Rhode Island
60-79.99
69.0
$329,317
$367,965
$445,261
$522,557
$599,853
$677,149
$793,093
$870,389
$909,037
$1,102,277
$1,295,517
$1,450,109
Rhode Island
80-99.99
85.1
$424,255
$480,455
$592,855
$705,255
$817,655
$930,055
$1,098,655
$1,211,055
$1,267,255
$1,548,255
$1,829,255
$2,054,055
Rhode Island
100 <
145.0
$684,626
$762,874
$919,370
$1,075,866
$1,232,362
$1,388,858
$1,623,602
$1,780,098
$1,858,346
$2,249,586
$2,640,826
$2,953,818
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
South Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Carolina
30-39.99
34.0
$192,972
$226,810
$294,486
$362,162
$429,838
$497,514
$599,028
$666,704
$700,542
$869,732
$1,038,922
$1,174,274
South Carolina
40-59.99
46.0
$235,449
$271,070
$342,312
$413,554
$484,796
$556,038
$662,901
$734,143
$769,764
$947,869
$1,125,974
$1,268,458
South Carolina
60-79.99
69.0
$351,499
$405,381
$513,145
$620,909
$728,673
$836,437
$998,083
$1,105,847
$1,159,729
$1,429,139
$1,698,549
$1,914,077
South Carolina
80-99.99
85.1
$408,624
$465,033
$577,851
$690,669
$803,487
$916,305
$1,085,532
$1,198,350
$1,254,759
$1,536,804
$1,818,849
$2,044,485
South Carolina
100 <
145.0
$727,834
$836,696
$1,054,420
$1,272,144
$1,489,868
$1,707,592
$2,034,178
$2,251,902
$2,360,764
$2,905,074
$3,449,384
$3,884,832
1-132

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Dakota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
South Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Dakota
30-39.99
34.0
$67,400
$85,153
$120,659
$156,165
$191,671
$227,177
$280,436
$315,942
$333,695
$422,460
$511,225
$582,237
South Dakota
40-59.99
46.0
$77,264
$95,844
$133,004
$170,164
$207,324
$244,484
$300,224
$337,384
$355,964
$448,864
$541,764
$616,084
South Dakota
60-79.99
69.0
$128,314
$160,831
$225,865
$290,899
$355,933
$420,967
$518,518
$583,552
$616,069
$778,654
$941,239
$1,071,307
South Dakota
80-99.99
85.1
$141,226
$174,531
$241,141
$307,751
$374,361
$440,971
$540,886
$607,496
$640,801
$807,326
$973,851
$1,107,071
South Dakota
100 <
145.0
$262,244
$327,622
$458,378
$589,134
$719,890
$850,646
$1,046,780
$1,177,536
$1,242,914
$1,569,804
$1,896,694
$2,158,206
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Tennessee
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Tennessee
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Tennessee
30-39.99
34.0
$146,759
$168,957
$213,353
$257,749
$302,145
$346,541
$413,135
$457,531
$479,729
$590,719
$701,709
$790,501
Tennessee
40-59.99
46.0
$215,542
$251,254
$322,678
$394,102
$465,526
$536,950
$644,086
$715,510
$751,222
$929,782
$1,108,342
$1,251,190
Tennessee
60-79.99
69.0
$286,763
$325,698
$403,568
$481,438
$559,308
$637,178
$753,983
$831,853
$870,788
$1,065,463
$1,260,138
$1,415,878
Tennessee
80-99.99
85.1
$371,820
$428,422
$541,626
$654,830
$768,034
$881,238
$1,051,044
$1,164,248
$1,220,850
$1,503,860
$1,786,870
$2,013,278
Tennessee
100 <
145.0
$665,126
$774,318
$992,702
$1,211,086
$1,429,470
$1,647,854
$1,975,430
$2,193,814
$2,303,006
$2,848,966
$3,394,926
$3,831,694
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Texas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Texas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Texas
30-39.99
34.0
$228,468
$260,971
$325,977
$390,983
$455,989
$520,995
$618,504
$683,510
$716,013
$878,528
$1,041,043
$1,171,055
1-133

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Texas
40-59.99
46.0
$283,346
$317,034
$384,410
$451,786
$519,162
$586,538
$687,602
$754,978
$788,666
$957,106
$1,125,546
$1,260,298
Texas
60-79.99
69.0
$422,988
$473,614
$574,866
$676,118
$777,370
$878,622
$1,030,500
$1,131,752
$1,182,378
$1,435,508
$1,688,638
$1,891,142
Texas
80-99.99
85.1
$529,212
$594,232
$724,272
$854,312
$984,352
$1,114,392
$1,309,452
$1,439,492
$1,504,512
$1,829,612
$2,154,712
$2,414,792
Texas
100 <
145.0
$878,084
$980,122
$1,184,198
$1,388,274
$1,592,350
$1,796,426
$2,102,540
$2,306,616
$2,408,654
$2,918,844
$3,429,034
$3,837,186
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Utah
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Utah
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Utah
30-39.99
34.0
$41,571
$59,100
$94,158
$129,216
$164,274
$199,332
$251,919
$286,977
$304,506
$392,151
$479,796
$549,912
Utah
40-59.99
46.0
$42,319
$60,596
$97,150
$133,704
$170,258
$206,812
$261,643
$298,197
$316,474
$407,859
$499,244
$572,352
Utah
60-79.99
69.0
$43,753
$63,464
$102,886
$142,308
$181,730
$221,152
$280,285
$319,707
$339,418
$437,973
$536,528
$615,372
Utah
80-99.99
85.1
$44,832
$65,622
$107,202
$148,782
$190,362
$231,942
$294,312
$335,892
$356,682
$460,632
$564,582
$647,742
Utah
100 <
145.0
$88,092
$128,100
$208,116
$288,132
$368,148
$448,164
$568,188
$648,204
$688,212
$888,252
$1,088,292
$1,248,324
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Vermont
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Vermont
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Vermont
30-39.99
34.0
$123,752
$144,188
$185,060
$225,932
$266,804
$307,676
$368,984
$409,856
$430,292
$532,472
$634,652
$716,396
Vermont
40-59.99
46.0
$153,479
$175,662
$220,028
$264,394
$308,760
$353,126
$419,675
$464,041
$486,224
$597,139
$708,054
$796,786
Vermont
60-79.99
69.0
$241,111
$277,508
$350,302
$423,096
$495,890
$568,684
$677,875
$750,669
$787,066
$969,051
$1,151,036
$1,296,624
Vermont
80-99.99
85.1
$280,313
$318,373
$394,493
$470,613
$546,733
$622,853
$737,033
$813,153
$851,213
$1,041,513
$1,231,813
$1,384,053
Vermont
100 <
145.0
$499,266
$572,782
$719,814
$866,846
$1,013,878
$1,160,910
$1,381,458
$1,528,490
$1,602,006
$1,969,586
$2,337,166
$2,631,230
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
1-134

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Virginia
30-39.99
34.0
$124,587
$145,947
$188,667
$231,387
$274,107
$316,827
$380,907
$423,627
$444,987
$551,787
$658,587
$744,027
Virginia
40-59.99
46.0
$185,750
$220,533
$290,099
$359,665
$429,231
$498,797
$603,146
$672,712
$707,495
$881,410
$1,055,325
$1,194,457
Virginia
60-79.99
69.0
$242,261
$279,989
$355,445
$430,901
$506,357
$581,813
$694,997
$770,453
$808,181
$996,821
$1,185,461
$1,336,373
Virginia
80-99.99
85.1
$316,731
$371,641
$481,461
$591,281
$701,101
$810,921
$975,651
$1,085,471
$1,140,381
$1,414,931
$1,689,481
$1,909,121
Virginia
100 <
145.0
$501,682
$577,996
$730,624
$883,252
$1,035,880
$1,188,508
$1,417,450
$1,570,078
$1,646,392
$2,027,962
$2,409,532
$2,714,788
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Washington
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Washington
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Washington
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Washington
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Washington
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Washington
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Washington
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
West Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
West Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
West Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
West Virginia
30-39.99
34.0
$92,253
$113,973
$157,413
$200,853
$244,293
$287,733
$352,893
$396,333
$418,053
$526,653
$635,253
$722,133
West Virginia
40-59.99
46.0
$110,938
$134,934
$182,926
$230,918
$278,910
$326,902
$398,890
$446,882
$470,878
$590,858
$710,838
$806,822
West Virginia
60-79.99
69.0
$176,430
$214,676
$291,168
$367,660
$444,152
$520,644
$635,382
$711,874
$750,120
$941,350
$1,132,580
$1,285,564
West Virginia
80-99.99
85.1
$200,665
$241,131
$322,063
$402,995
$483,927
$564,859
$686,257
$767,189
$807,655
$1,009,985
$1,212,315
$1,374,179
1-135

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
100 <
145.0
$363,342
$440,744
$595,548
$750,352
$905,156
$1,059,960
$1,292,166
$1,446,970
$1,524,372
$1,911,382
$2,298,392
$2,608,000
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wisconsin
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Wisconsin
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wisconsin
30-39.99
34.0
$135,437
$155,504
$195,638
$235,772
$275,906
$316,040
$376,241
$416,375
$436,442
$536,777
$637,112
$717,380
Wisconsin
40-59.99
46.0
$169,287
$190,971
$234,339
$277,707
$321,075
$364,443
$429,495
$472,863
$494,547
$602,967
$711,387
$798,123
Wisconsin
60-79.99
69.0
$265,041
$300,907
$372,639
$444,371
$516,103
$587,835
$695,433
$767,165
$803,031
$982,361
$1,161,691
$1,305,155
Wisconsin
80-99.99
85.1
$309,827
$347,232
$422,042
$496,852
$571,662
$646,472
$758,687
$833,497
$870,902
$1,057,927
$1,244,952
$1,394,572
Wisconsin
100 <
145.0
$549,554
$621,954
$766,754
$911,554
$1,056,354
$1,201,154
$1,418,354
$1,563,154
$1,635,554
$1,997,554
$2,359,554
$2,649,154
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wyoming
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Wyoming
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wyoming
30-39.99
34.0
$63,288
$80,843
$115,953
$151,063
$186,173
$221,283
$273,948
$309,058
$326,613
$414,388
$502,163
$572,383
Wyoming
40-59.99
46.0
$71,701
$90,013
$126,637
$163,261
$199,885
$236,509
$291,445
$328,069
$346,381
$437,941
$529,501
$602,749
Wyoming
60-79.99
69.0
$87,827
$107,591
$147,119
$186,647
$226,175
$265,703
$324,995
$364,523
$384,287
$483,107
$581,927
$660,983
Wyoming
80-99.99
85.1
$99,189
$120,044
$161,754
$203,464
$245,174
$286,884
$349,449
$391,159
$412,014
$516,289
$620,564
$703,984
Wyoming
100 <
145.0
$180,710
$220,828
$301,064
$381,300
$461,536
$541,772
$662,126
$742,362
$782,480
$983,070
$1,183,660
$1,344,132
1-136

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alabama
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alabama
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alabama
30-39.99
34.0
$301,621
$335,830
$404,248
$472,666
$541,084
$609,502
$712,129
$780,547
$814,756
$985,801
$1,156,846
$1,293,682
Alabama
40-59.99
46.0
$382,444
$418,566
$490,810
$563,054
$635,298
$707,542
$815,908
$888,152
$924,274
$1,104,884
$1,285,494
$1,429,982
Alabama
60-79.99
69.0
$572,096
$626,833
$736,307
$845,781
$955,255
$1,064,729
$1,228,940
$1,338,414
$1,393,151
$1,666,836
$1,940,521
$2,159,469
Alabama
80-99.99
85.1
$712,538
$782,054
$921,086
$1,060,118
$1,199,150
$1,338,182
$1,546,730
$1,685,762
$1,755,278
$2,102,858
$2,450,438
$2,728,502
Alabama
100 <
145.0
$1,191,406
$1,302,064
$1,523,380
$1,744,696
$1,966,012
$2,187,328
$2,519,302
$2,740,618
$2,851,276
$3,404,566
$3,957,856
$4,400,488
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Alaska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Alaska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Alaska
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Alaska
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Alaska
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Alaska
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Alaska
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Arizona
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Arizona
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Arizona
30-39.99
34.0
$40,503
$56,964
$89,886
$122,808
$155,730
$188,652
$238,035
$270,957
$287,418
$369,723
$452,028
$517,872
1-137

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$40,976
$57,910
$91,778
$125,646
$159,514
$193,382
$244,184
$278,052
$294,986
$379,656
$464,326
$532,062
Arizona
60-79.99
69.0
$41,738
$59,434
$94,826
$130,218
$165,610
$201,002
$254,090
$289,482
$307,178
$395,658
$484,138
$554,922
Arizona
80-99.99
85.1
$42,272
$60,502
$96,962
$133,422
$169,882
$206,342
$261,032
$297,492
$315,722
$406,872
$498,022
$570,942
Arizona
100 <
145.0
$83,708
$119,332
$190,580
$261,828
$333,076
$404,324
$511,196
$582,444
$618,068
$796,188
$974,308
$1,116,804
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Arkansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Arkansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Arkansas
30-39.99
34.0
$247,380
$281,442
$349,566
$417,690
$485,814
$553,938
$656,124
$724,248
$758,310
$928,620
$1,098,930
$1,235,178
Arkansas
40-59.99
46.0
$309,059
$344,982
$416,828
$488,674
$560,520
$632,366
$740,135
$811,981
$847,904
$1,027,519
$1,207,134
$1,350,826
Arkansas
60-79.99
69.0
$461,977
$516,375
$625,171
$733,967
$842,763
$951,559
$1,114,753
$1,223,549
$1,277,947
$1,549,937
$1,821,927
$2,039,519
Arkansas
80-99.99
85.1
$576,549
$645,472
$783,318
$921,164
$1,059,010
$1,196,856
$1,403,625
$1,541,471
$1,610,394
$1,955,009
$2,299,624
$2,575,316
Arkansas
100 <
145.0
$960,000
$1,069,948
$1,289,844
$1,509,740
$1,729,636
$1,949,532
$2,279,376
$2,499,272
$2,609,220
$3,158,960
$3,708,700
$4,148,492
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
California
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
California
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
California
30-39.99
34.0
$53,522
$71,609
$107,783
$143,957
$180,131
$216,305
$270,566
$306,740
$324,827
$415,262
$505,697
$578,045
California
40-59.99
46.0
$58,489
$77,521
$115,585
$153,649
$191,713
$229,777
$286,873
$324,937
$343,969
$439,129
$534,289
$610,417
California
60-79.99
69.0
$68,083
$89,002
$130,840
$172,678
$214,516
$256,354
$319,111
$360,949
$381,868
$486,463
$591,058
$674,734
California
80-99.99
85.1
$106,250
$140,149
$207,947
$275,745
$343,543
$411,341
$513,038
$580,836
$614,735
$784,230
$953,725
$1,089,321
California
100 <
145.0
$139,064
$181,454
$266,234
$351,014
$435,794
$520,574
$647,744
$732,524
$774,914
$986,864
$1,198,814
$1,368,374
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-138

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Colorado
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Colorado
30-39.99
34.0
$83,542
$100,889
$135,583
$170,277
$204,971
$239,665
$291,706
$326,400
$343,747
$430,482
$517,217
$586,605
Colorado
40-59.99
46.0
$99,103
$117,134
$153,196
$189,258
$225,320
$261,382
$315,475
$351,537
$369,568
$459,723
$549,878
$622,002
Colorado
60-79.99
69.0
$128,930
$148,272
$186,956
$225,640
$264,324
$303,008
$361,034
$399,718
$419,060
$515,770
$612,480
$689,848
Colorado
80-99.99
85.1
$181,924
$214,508
$279,676
$344,844
$410,012
$475,180
$572,932
$638,100
$670,684
$833,604
$996,524
$1,126,860
Colorado
100 <
145.0
$266,936
$306,018
$384,182
$462,346
$540,510
$618,674
$735,920
$814,084
$853,166
$1,048,576
$1,243,986
$1,400,314
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Connecticut
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Connecticut
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Connecticut
30-39.99
34.0
$122,986
$144,937
$188,839
$232,741
$276,643
$320,545
$386,398
$430,300
$452,251
$562,006
$671,761
$759,565
Connecticut
40-59.99
46.0
$183,353
$218,704
$289,406
$360,108
$430,810
$501,512
$607,565
$678,267
$713,618
$890,373
$1,067,128
$1,208,532
Connecticut
60-79.99
69.0
$238,664
$277,243
$354,401
$431,559
$508,717
$585,875
$701,612
$778,770
$817,349
$1,010,244
$1,203,139
$1,357,455
Connecticut
80-99.99
85.1
$312,440
$368,544
$480,752
$592,960
$705,168
$817,376
$985,688
$1,097,896
$1,154,000
$1,434,520
$1,715,040
$1,939,456
Connecticut
100 <
145.0
$494,126
$572,230
$728,438
$884,646
$1,040,854
$1,197,062
$1,431,374
$1,587,582
$1,665,686
$2,056,206
$2,446,726
$2,759,142
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Delaware
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Delaware
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Delaware
30-39.99
34.0
$132,713
$154,462
$197,960
$241,458
$284,956
$328,454
$393,701
$437,199
$458,948
$567,693
$676,438
$763,434
Delaware
40-59.99
46.0
$196,591
$231,747
$302,059
$372,371
$442,683
$512,995
$618,463
$688,775
$723,931
$899,711
$1,075,491
$1,216,115
Delaware
60-79.99
69.0
$258,523
$296,811
$373,387
$449,963
$526,539
$603,115
$717,979
$794,555
$832,843
$1,024,283
$1,215,723
$1,368,875
Delaware
80-99.99
85.1
$336,882
$392,577
$503,967
$615,357
$726,747
$838,137
$1,005,222
$1,116,612
$1,172,307
$1,450,782
$1,729,257
$1,952,037
Delaware
100 <
145.0
$535,856
$613,346
$768,326
$923,306
$1,078,286
$1,233,266
$1,465,736
$1,620,716
$1,698,206
$2,085,656
$2,473,106
$2,783,066
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-139

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
District of
Columbia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
District of
Columbia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
District of
Columbia
30-39.99
34.0
$129,530
$151,092
$194,216
$237,340
$280,464
$323,588
$388,274
$431,398
$452,960
$560,770
$668,580
$754,828
District of
Columbia
40-59.99
46.0
$192,358
$227,335
$297,289
$367,243
$437,197
$507,151
$612,082
$682,036
$717,013
$891,898
$1,066,783
$1,206,691
District of
Columbia
60-79.99
69.0
$252,173
$290,192
$366,230
$442,268
$518,306
$594,344
$708,401
$784,439
$822,458
$1,012,553
$1,202,648
$1,354,724
District of
Columbia
80-99.99
85.1
$329,005
$384,323
$494,959
$605,595
$716,231
$826,867
$992,821
$1,103,457
$1,158,775
$1,435,365
$1,711,955
$1,933,227
District of
Columbia
100 <
145.0
$522,512
$599,438
$753,290
$907,142
$1,060,994
$1,214,846
$1,445,624
$1,599,476
$1,676,402
$2,061,032
$2,445,662
$2,753,366
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Florida
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Florida
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Florida
30-39.99
34.0
$298,010
$333,684
$405,032
$476,380
$547,728
$619,076
$726,098
$797,446
$833,120
$1,011,490
$1,189,860
$1,332,556
Florida
40-59.99
46.0
$411,975
$464,703
$570,159
$675,615
$781,071
$886,527
$1,044,711
$1,150,167
$1,202,895
$1,466,535
$1,730,175
$1,941,087
Florida
60-79.99
69.0
$596,686
$666,523
$806,197
$945,871
$1,085,545
$1,225,219
$1,434,730
$1,574,404
$1,644,241
$1,993,426
$2,342,611
$2,621,959
Florida
80-99.99
85.1
$703,187
$776,058
$921,800
$1,067,542
$1,213,284
$1,359,026
$1,577,639
$1,723,381
$1,796,252
$2,160,607
$2,524,962
$2,816,446
Florida
100 <
145.0
$1,239,676
$1,380,668
$1,662,652
$1,944,636
$2,226,620
$2,508,604
$2,931,580
$3,213,564
$3,354,556
$4,059,516
$4,764,476
$5,328,444
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-140

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Georgia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Georgia
30-39.99
34.0
$239,665
$274,062
$342,856
$411,650
$480,444
$549,238
$652,429
$721,223
$755,620
$927,605
$1,099,590
$1,237,178
Georgia
40-59.99
46.0
$298,620
$334,996
$407,748
$480,500
$553,252
$626,004
$735,132
$807,884
$844,260
$1,026,140
$1,208,020
$1,353,524
Georgia
60-79.99
69.0
$446,411
$501,581
$611,921
$722,261
$832,601
$942,941
$1,108,451
$1,218,791
$1,273,961
$1,549,811
$1,825,661
$2,046,341
Georgia
80-99.99
85.1
$525,682
$583,679
$699,673
$815,667
$931,661
$1,047,655
$1,221,646
$1,337,640
$1,395,637
$1,685,622
$1,975,607
$2,207,595
Georgia
100 <
145.0
$927,286
$1,038,854
$1,261,990
$1,485,126
$1,708,262
$1,931,398
$2,266,102
$2,489,238
$2,600,806
$3,158,646
$3,716,486
$4,162,758
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Hawaii
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Hawaii
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Hawaii
30-39.99
34.0
$281,995
$312,902
$374,716
$436,530
$498,344
$560,158
$652,879
$714,693
$745,600
$900,135
$1,054,670
$1,178,298
Hawaii
40-59.99
46.0
$389,635
$435,242
$526,456
$617,670
$708,884
$800,098
$936,919
$1,028,133
$1,073,740
$1,301,775
$1,529,810
$1,712,238
Hawaii
60-79.99
69.0
$564,242
$624,462
$744,902
$865,342
$985,782
$1,106,222
$1,286,882
$1,407,322
$1,467,542
$1,768,642
$2,069,742
$2,310,622
Hawaii
80-99.99
85.1
$663,502
$724,842
$847,522
$970,202
$1,092,882
$1,215,562
$1,399,582
$1,522,262
$1,583,602
$1,890,302
$2,197,002
$2,442,362
Hawaii
100 <
145.0
$1,171,542
$1,292,372
$1,534,032
$1,775,692
$2,017,352
$2,259,012
$2,621,502
$2,863,162
$2,983,992
$3,588,142
$4,192,292
$4,675,612
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Idaho
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
Idaho
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Idaho
30-39.99
34.0
$25,552
$41,712
$74,032
$106,352
$138,672
$170,992
$219,472
$251,792
$267,952
$348,752
$429,552
$494,192
Idaho
40-59.99
46.0
$41,684
$59,326
$94,610
$129,894
$165,178
$200,462
$253,388
$288,672
$306,314
$394,524
$482,734
$553,302
Idaho
60-79.99
69.0
$42,801
$61,560
$99,078
$136,596
$174,114
$211,632
$267,909
$305,427
$324,186
$417,981
$511,776
$586,812
Idaho
80-99.99
85.1
$43,582
$63,122
$102,202
$141,282
$180,362
$219,442
$278,062
$317,142
$336,682
$434,382
$532,082
$610,242
Idaho
100 <
145.0
$85,940
$123,796
$199,508
$275,220
$350,932
$426,644
$540,212
$615,924
$653,780
$843,060
$1,032,340
$1,183,764
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-141

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Illinois
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Illinois
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Illinois
30-39.99
34.0
$111,224
$131,520
$172,112
$212,704
$253,296
$293,888
$354,776
$395,368
$415,664
$517,144
$618,624
$699,808
Illinois
40-59.99
46.0
$168,087
$201,848
$269,370
$336,892
$404,414
$471,936
$573,219
$640,741
$674,502
$843,307
$1,012,112
$1,147,156
Illinois
60-79.99
69.0
$215,769
$251,965
$324,357
$396,749
$469,141
$541,533
$650,121
$722,513
$758,709
$939,689
$1,120,669
$1,265,453
Illinois
80-99.99
85.1
$249,057
$286,869
$362,493
$438,117
$513,741
$589,365
$702,801
$778,425
$816,237
$1,005,297
$1,194,357
$1,345,605
Illinois
100 <
145.0
$446,010
$519,104
$665,292
$811,480
$957,668
$1,103,856
$1,323,138
$1,469,326
$1,542,420
$1,907,890
$2,273,360
$2,565,736
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Indiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Indiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Indiana
30-39.99
34.0
$160,873
$182,136
$224,662
$267,188
$309,714
$352,240
$416,029
$458,555
$479,818
$586,133
$692,448
$777,500
Indiana
40-59.99
46.0
$234,881
$269,571
$338,951
$408,331
$477,711
$547,091
$651,161
$720,541
$755,231
$928,681
$1,102,131
$1,240,891
Indiana
60-79.99
69.0
$315,958
$353,546
$428,722
$503,898
$579,074
$654,250
$767,014
$842,190
$879,778
$1,067,718
$1,255,658
$1,406,010
Indiana
80-99.99
85.1
$407,601
$462,315
$571,743
$681,171
$790,599
$900,027
$1,064,169
$1,173,597
$1,228,311
$1,501,881
$1,775,451
$1,994,307
Indiana
100 <
145.0
$656,554
$732,574
$884,614
$1,036,654
$1,188,694
$1,340,734
$1,568,794
$1,720,834
$1,796,854
$2,176,954
$2,557,054
$2,861,134
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Iowa
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Iowa
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Iowa
30-39.99
34.0
$132,155
$152,250
$192,440
$232,630
$272,820
$313,010
$373,295
$413,485
$433,580
$534,055
$634,530
$714,910
Iowa
40-59.99
46.0
$196,485
$230,053
$297,189
$364,325
$431,461
$498,597
$599,301
$666,437
$700,005
$867,845
$1,035,685
$1,169,957
Iowa
60-79.99
69.0
$258,365
$294,271
$366,083
$437,895
$509,707
$581,519
$689,237
$761,049
$796,955
$976,485
$1,156,015
$1,299,639
Iowa
80-99.99
85.1
$336,112
$388,294
$492,658
$597,022
$701,386
$805,750
$962,296
$1,066,660
$1,118,842
$1,379,752
$1,640,662
$1,849,390
1-142

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$535,526
$608,012
$752,984
$897,956
$1,042,928
$1,187,900
$1,405,358
$1,550,330
$1,622,816
$1,985,246
$2,347,676
$2,637,620
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kansas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kansas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kansas
30-39.99
34.0
$150,798
$171,624
$213,276
$254,928
$296,580
$338,232
$400,710
$442,362
$463,188
$567,318
$671,448
$754,752
Kansas
40-59.99
46.0
$221,421
$255,691
$324,231
$392,771
$461,311
$529,851
$632,661
$701,201
$735,471
$906,821
$1,078,171
$1,215,251
Kansas
60-79.99
69.0
$295,769
$332,728
$406,646
$480,564
$554,482
$628,400
$739,277
$813,195
$850,154
$1,034,949
$1,219,744
$1,367,580
Kansas
80-99.99
85.1
$382,596
$436,429
$544,095
$651,761
$759,427
$867,093
$1,028,592
$1,136,258
$1,190,091
$1,459,256
$1,728,421
$1,943,753
Kansas
100 <
145.0
$683,138
$787,262
$995,510
$1,203,758
$1,412,006
$1,620,254
$1,932,626
$2,140,874
$2,244,998
$2,765,618
$3,286,238
$3,702,734
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Kentucky
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Kentucky
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Kentucky
30-39.99
34.0
$122,202
$144,241
$188,319
$232,397
$276,475
$320,553
$386,670
$430,748
$452,787
$562,982
$673,177
$761,333
Kentucky
40-59.99
46.0
$182,256
$217,690
$288,558
$359,426
$430,294
$501,162
$607,464
$678,332
$713,766
$890,936
$1,068,106
$1,209,842
Kentucky
60-79.99
69.0
$237,020
$275,725
$353,135
$430,545
$507,955
$585,365
$701,480
$778,890
$817,595
$1,011,120
$1,204,645
$1,359,465
Kentucky
80-99.99
85.1
$310,433
$366,713
$479,273
$591,833
$704,393
$816,953
$985,793
$1,098,353
$1,154,633
$1,436,033
$1,717,433
$1,942,553
Kentucky
100 <
145.0
$490,670
$569,038
$725,774
$882,510
$1,039,246
$1,195,982
$1,431,086
$1,587,822
$1,666,190
$2,058,030
$2,449,870
$2,763,342
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Louisiana
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Louisiana
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Louisiana
30-39.99
34.0
$348,247
$383,462
$453,892
$524,322
$594,752
$665,182
$770,827
$841,257
$876,472
$1,052,547
$1,228,622
$1,369,482
1-143

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$480,047
$532,260
$636,686
$741,112
$845,538
$949,964
$1,106,603
$1,211,029
$1,263,242
$1,524,307
$1,785,372
$1,994,224
Louisiana
60-79.99
69.0
$698,664
$767,597
$905,463
$1,043,329
$1,181,195
$1,319,061
$1,525,860
$1,663,726
$1,732,659
$2,077,324
$2,421,989
$2,697,721
Louisiana
80-99.99
85.1
$863,783
$950,570
$1,124,144
$1,297,718
$1,471,292
$1,644,866
$1,905,227
$2,078,801
$2,165,588
$2,599,523
$3,033,458
$3,380,606
Louisiana
100 <
145.0
$1,454,450
$1,594,016
$1,873,148
$2,152,280
$2,431,412
$2,710,544
$3,129,242
$3,408,374
$3,547,940
$4,245,770
$4,943,600
$5,501,864
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maine
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Maine
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maine
30-39.99
34.0
$115,900
$137,451
$180,553
$223,655
$266,757
$309,859
$374,512
$417,614
$439,165
$546,920
$654,675
$740,879
Maine
40-59.99
46.0
$173,921
$208,887
$278,819
$348,751
$418,683
$488,615
$593,513
$663,445
$698,411
$873,241
$1,048,071
$1,187,935
Maine
60-79.99
69.0
$224,519
$262,522
$338,528
$414,534
$490,540
$566,546
$680,555
$756,561
$794,564
$984,579
$1,174,594
$1,326,606
Maine
80-99.99
85.1
$259,975
$300,141
$380,473
$460,805
$541,137
$621,469
$741,967
$822,299
$862,465
$1,063,295
$1,264,125
$1,424,789
Maine
100 <
145.0
$464,400
$541,292
$695,076
$848,860
$1,002,644
$1,156,428
$1,387,104
$1,540,888
$1,617,780
$2,002,240
$2,386,700
$2,694,268
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Maryland
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Maryland
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Maryland
30-39.99
34.0
$129,609
$151,250
$194,532
$237,814
$281,096
$324,378
$389,301
$432,583
$454,224
$562,429
$670,634
$757,198
Maryland
40-59.99
46.0
$192,434
$227,487
$297,593
$367,699
$437,805
$507,911
$613,070
$683,176
$718,229
$893,494
$1,068,759
$1,208,971
Maryland
60-79.99
69.0
$252,287
$290,420
$366,686
$442,952
$519,218
$595,484
$709,883
$786,149
$824,282
$1,014,947
$1,205,612
$1,358,144
Maryland
80-99.99
85.1
$329,165
$384,643
$495,599
$606,555
$717,511
$828,467
$994,901
$1,105,857
$1,161,335
$1,438,725
$1,716,115
$1,938,027
Maryland
100 <
145.0
$522,750
$599,914
$754,242
$908,570
$1,062,898
$1,217,226
$1,448,718
$1,603,046
$1,680,210
$2,066,030
$2,451,850
$2,760,506
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-144

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Massachusetts
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Massachusetts
30-39.99
34.0
$121,219
$142,878
$186,196
$229,514
$272,832
$316,150
$381,127
$424,445
$446,104
$554,399
$662,694
$749,330
Massachusetts
40-59.99
46.0
$181,075
$216,145
$286,285
$356,425
$426,565
$496,705
$601,915
$672,055
$707,125
$882,475
$1,057,825
$1,198,105
Massachusetts
60-79.99
69.0
$235,248
$273,406
$349,722
$426,038
$502,354
$578,670
$693,144
$769,460
$807,618
$998,408
$1,189,198
$1,341,830
Massachusetts
80-99.99
85.1
$308,155
$363,668
$474,694
$585,720
$696,746
$807,772
$974,311
$1,085,337
$1,140,850
$1,418,415
$1,695,980
$1,918,032
Massachusetts
100 <
145.0
$486,946
$564,164
$718,600
$873,036
$1,027,472
$1,181,908
$1,413,562
$1,567,998
$1,645,216
$2,031,306
$2,417,396
$2,726,268
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Michigan
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Michigan
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Michigan
30-39.99
34.0
$64,658
$84,477
$124,115
$163,753
$203,391
$243,029
$302,486
$342,124
$361,943
$461,038
$560,133
$639,409
Michigan
40-59.99
46.0
$73,629
$95,079
$137,979
$180,879
$223,779
$266,679
$331,029
$373,929
$395,379
$502,629
$609,879
$695,679
Michigan
60-79.99
69.0
$121,657
$157,274
$228,508
$299,742
$370,976
$442,210
$549,061
$620,295
$655,912
$833,997
$1,012,082
$1,154,550
Michigan
80-99.99
85.1
$132,986
$170,084
$244,280
$318,476
$392,672
$466,868
$578,162
$652,358
$689,456
$874,946
$1,060,436
$1,208,828
Michigan
100 <
145.0
$248,238
$320,116
$463,872
$607,628
$751,384
$895,140
$1,110,774
$1,254,530
$1,326,408
$1,685,798
$2,045,188
$2,332,700
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Minnesota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Minnesota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Minnesota
30-39.99
34.0
$102,831
$122,427
$161,619
$200,811
$240,003
$279,195
$337,983
$377,175
$396,771
$494,751
$592,731
$671,115
Minnesota
40-59.99
46.0
$125,276
$146,425
$188,723
$231,021
$273,319
$315,617
$379,064
$421,362
$442,511
$548,256
$654,001
$738,597
Minnesota
60-79.99
69.0
$199,133
$234,305
$304,649
$374,993
$445,337
$515,681
$621,197
$691,541
$726,713
$902,573
$1,078,433
$1,219,121
Minnesota
80-99.99
85.1
$228,694
$265,397
$338,803
$412,209
$485,615
$559,021
$669,130
$742,536
$779,239
$962,754
$1,146,269
$1,293,081
Minnesota
100 <
145.0
$411,312
$482,516
$624,924
$767,332
$909,740
$1,052,148
$1,265,760
$1,408,168
$1,479,372
$1,835,392
$2,191,412
$2,476,228
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-145

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Mississippi
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Mississippi
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Mississippi
30-39.99
34.0
$269,529
$304,093
$373,221
$442,349
$511,477
$580,605
$684,297
$753,425
$787,989
$960,809
$1,133,629
$1,271,885
Mississippi
40-59.99
46.0
$339,026
$375,629
$448,835
$522,041
$595,247
$668,453
$778,262
$851,468
$888,071
$1,071,086
$1,254,101
$1,400,513
Mississippi
60-79.99
69.0
$507,065
$562,621
$673,733
$784,845
$895,957
$1,007,069
$1,173,737
$1,284,849
$1,340,405
$1,618,185
$1,895,965
$2,118,189
Mississippi
80-99.99
85.1
$632,212
$702,617
$843,427
$984,237
$1,125,047
$1,265,857
$1,477,072
$1,617,882
$1,688,287
$2,040,312
$2,392,337
$2,673,957
Mississippi
100 <
145.0
$1,118,294
$1,254,636
$1,527,320
$1,800,004
$2,072,688
$2,345,372
$2,754,398
$3,027,082
$3,163,424
$3,845,134
$4,526,844
$5,072,212
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Missour

15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Missour

20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Missour

30-39.99
34.0
$188,001
$220,938
$286,812
$352,686
$418,560
$484,434
$583,245
$649,119
$682,056
$846,741
$1,011,426
$1,143,174
Missour

40-59.99
46.0
$228,598
$262,874
$331,426
$399,978
$468,530
$537,082
$639,910
$708,462
$742,738
$914,118
$1,085,498
$1,222,602
Missour

60-79.99
69.0
$340,986
$392,614
$495,870
$599,126
$702,382
$805,638
$960,522
$1,063,778
$1,115,406
$1,373,546
$1,631,686
$1,838,198
Missour

80-99.99
85.1
$395,873
$449,718
$557,408
$665,098
$772,788
$880,478
$1,042,013
$1,149,703
$1,203,548
$1,472,773
$1,741,998
$1,957,378
Missour

100 <
145.0
$705,760
$809,904
$1,018,192
$1,226,480
$1,434,768
$1,643,056
$1,955,488
$2,163,776
$2,267,920
$2,788,640
$3,309,360
$3,725,936
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Montana
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Montana
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Montana
30-39.99
34.0
$44,476
$61,600
$95,848
$130,096
$164,344
$198,592
$249,964
$284,212
$301,336
$386,956
$472,576
$541,072
Montana
40-59.99
46.0
$46,250
$63,980
$99,440
$134,900
$170,360
$205,820
$259,010
$294,470
$312,200
$400,850
$489,500
$560,420
Montana
60-79.99
69.0
$49,649
$68,539
$106,319
$144,099
$181,879
$219,659
$276,329
$314,109
$332,999
$427,449
$521,899
$597,459
Montana
80-99.99
85.1
$52,028
$71,730
$111,134
$150,538
$189,942
$229,346
$288,452
$327,856
$347,558
$446,068
$544,578
$623,386
1-146

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$100,332
$138,466
$214,734
$291,002
$367,270
$443,538
$557,940
$634,208
$672,342
$863,012
$1,053,682
$1,206,218
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Nebraska
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Nebraska
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Nebraska
30-39.99
34.0
$130,340
$149,872
$188,936
$228,000
$267,064
$306,128
$364,724
$403,788
$423,320
$520,980
$618,640
$696,768
Nebraska
40-59.99
46.0
$162,493
$183,555
$225,679
$267,803
$309,927
$352,051
$415,237
$457,361
$478,423
$583,733
$689,043
$773,291
Nebraska
60-79.99
69.0
$254,996
$290,075
$360,233
$430,391
$500,549
$570,707
$675,944
$746,102
$781,181
$956,576
$1,131,971
$1,272,287
Nebraska
80-99.99
85.1
$297,593
$334,182
$407,360
$480,538
$553,716
$626,894
$736,661
$809,839
$846,428
$1,029,373
$1,212,318
$1,358,674
Nebraska
100 <
145.0
$528,458
$599,218
$740,738
$882,258
$1,023,778
$1,165,298
$1,377,578
$1,519,098
$1,589,858
$1,943,658
$2,297,458
$2,580,498
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
$2,541
Nevada
15-19.99
17.0
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
$2,914
Nevada
20-29.99
23.0
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
$4,326
Nevada
30-39.99
34.0
$21,467
$33,542
$57,692
$81,842
$105,992
$130,142
$166,367
$190,517
$202,592
$262,967
$323,342
$371,642
Nevada
40-59.99
46.0
$40,128
$56,214
$88,386
$120,558
$152,730
$184,902
$233,160
$265,332
$281,418
$361,848
$442,278
$506,622
Nevada
60-79.99
69.0
$40,505
$56,968
$89,894
$122,820
$155,746
$188,672
$238,061
$270,987
$287,450
$369,765
$452,080
$517,932
Nevada
80-99.99
85.1
$40,768
$57,494
$90,946
$124,398
$157,850
$191,302
$241,480
$274,932
$291,658
$375,288
$458,918
$525,822
Nevada
100 <
145.0
$81,124
$114,164
$180,244
$246,324
$312,404
$378,484
$477,604
$543,684
$576,724
$741,924
$907,124
$1,039,284
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
1-147

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New
Hampshire
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New
Hampshire
30-39.99
34.0
$100,485
$121,827
$164,511
$207,195
$249,879
$292,563
$356,589
$399,273
$420,615
$527,325
$634,035
$719,403
New
Hampshire
40-59.99
46.0
$122,074
$145,558
$192,526
$239,494
$286,462
$333,430
$403,882
$450,850
$474,334
$591,754
$709,174
$803,110
New
Hampshire
60-79.99
69.0
$193,358
$231,060
$306,464
$381,868
$457,272
$532,676
$645,782
$721,186
$758,888
$947,398
$1,135,908
$1,286,716
New
Hampshire
80-99.99
85.1
$221,418
$261,088
$340,428
$419,768
$499,108
$578,448
$697,458
$776,798
$816,468
$1,014,818
$1,213,168
$1,371,848
New
Hampshire
100 <
145.0
$398,914
$475,172
$627,688
$780,204
$932,720
$1,085,236
$1,314,010
$1,466,526
$1,542,784
$1,924,074
$2,305,364
$2,610,396
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Jersey
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New Jersey
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New Jersey
30-39.99
34.0
$182,466
$204,793
$249,447
$294,101
$338,755
$383,409
$450,390
$495,044
$517,371
$629,006
$740,641
$829,949
New Jersey
40-59.99
46.0
$263,801
$299,637
$371,309
$442,981
$514,653
$586,325
$693,833
$765,505
$801,341
$980,521
$1,159,701
$1,303,045
New Jersey
60-79.99
69.0
$359,152
$398,273
$476,515
$554,757
$632,999
$711,241
$828,604
$906,846
$945,967
$1,141,572
$1,337,177
$1,493,661
New Jersey
80-99.99
85.1
$461,131
$517,993
$631,717
$745,441
$859,165
$972,889
$1,143,475
$1,257,199
$1,314,061
$1,598,371
$1,882,681
$2,110,129
New Jersey
100 <
145.0
$747,322
$826,562
$985,042
$1,143,522
$1,302,002
$1,460,482
$1,698,202
$1,856,682
$1,935,922
$2,332,122
$2,728,322
$3,045,282
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New Mexico
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
New Mexico
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
New Mexico
30-39.99
34.0
$41,702
$59,362
$94,682
$130,002
$165,322
$200,642
$253,622
$288,942
$306,602
$394,902
$483,202
$553,842
New Mexico
40-59.99
46.0
$42,496
$60,950
$97,858
$134,766
$171,674
$208,582
$263,944
$300,852
$319,306
$411,576
$503,846
$577,662
New Mexico
60-79.99
69.0
$44,094
$64,146
$104,250
$144,354
$184,458
$224,562
$284,718
$324,822
$344,874
$445,134
$545,394
$625,602
1-148

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$45,160
$66,278
$108,514
$150,750
$192,986
$235,222
$298,576
$340,812
$361,930
$467,520
$573,110
$657,582
New Mexico
100 <
145.0
$88,650
$129,216
$210,348
$291,480
$372,612
$453,744
$575,442
$656,574
$697,140
$899,970
$1,102,800
$1,265,064
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
New York
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
New York
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
New York
30-39.99
34.0
$115,924
$136,783
$178,501
$220,219
$261,937
$303,655
$366,232
$407,950
$428,809
$533,104
$637,399
$720,835
New York
40-59.99
46.0
$174,226
$208,528
$277,132
$345,736
$414,340
$482,944
$585,850
$654,454
$688,756
$860,266
$1,031,776
$1,168,984
New York
60-79.99
69.0
$224,974
$261,980
$335,992
$410,004
$484,016
$558,028
$669,046
$743,058
$780,064
$965,094
$1,150,124
$1,298,148
New York
80-99.99
85.1
$260,412
$299,224
$376,848
$454,472
$532,096
$609,720
$726,156
$803,780
$842,592
$1,036,652
$1,230,712
$1,385,960
New York
100 <
145.0
$465,354
$540,150
$689,742
$839,334
$988,926
$1,138,518
$1,362,906
$1,512,498
$1,587,294
$1,961,274
$2,335,254
$2,634,438
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
North Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
North Carolina
30-39.99
34.0
$181,867
$203,640
$247,186
$290,732
$334,278
$377,824
$443,143
$486,689
$508,462
$617,327
$726,192
$813,284
North Carolina
40-59.99
46.0
$263,084
$298,263
$368,621
$438,979
$509,337
$579,695
$685,232
$755,590
$790,769
$966,664
$1,142,559
$1,283,275
North Carolina
60-79.99
69.0
$358,262
$396,584
$473,228
$549,872
$626,516
$703,160
$818,126
$894,770
$933,092
$1,124,702
$1,316,312
$1,469,600
North Carolina
80-99.99
85.1
$459,901
$515,645
$627,133
$738,621
$850,109
$961,597
$1,128,829
$1,240,317
$1,296,061
$1,574,781
$1,853,501
$2,076,477
North Carolina
100 <
145.0
$745,456
$823,020
$978,148
$1,133,276
$1,288,404
$1,443,532
$1,676,224
$1,831,352
$1,908,916
$2,296,736
$2,684,556
$2,994,812
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
North Dakota
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
North Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
1-149

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$41,793
$59,544
$95,046
$130,548
$166,050
$201,552
$254,805
$290,307
$308,058
$396,813
$485,568
$556,572
North Dakota
40-59.99
46.0
$42,620
$61,198
$98,354
$135,510
$172,666
$209,822
$265,556
$302,712
$321,290
$414,180
$507,070
$581,382
North Dakota
60-79.99
69.0
$44,280
$64,518
$104,994
$145,470
$185,946
$226,422
$287,136
$327,612
$347,850
$449,040
$550,230
$631,182
North Dakota
80-99.99
85.1
$45,389
$66,736
$109,430
$152,124
$194,818
$237,512
$301,553
$344,247
$365,594
$472,329
$579,064
$664,452
North Dakota
100 <
145.0
$89,042
$130,000
$211,916
$293,832
$375,748
$457,664
$580,538
$662,454
$703,412
$908,202
$1,112,992
$1,276,824
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Ohio
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Ohio
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Ohio
30-39.99
34.0
$144,787
$165,774
$207,748
$249,722
$291,696
$333,670
$396,631
$438,605
$459,592
$564,527
$669,462
$753,410
Ohio
40-59.99
46.0
$182,013
$205,017
$251,025
$297,033
$343,041
$389,049
$458,061
$504,069
$527,073
$642,093
$757,113
$849,129
Ohio
60-79.99
69.0
$283,475
$320,665
$395,045
$469,425
$543,805
$618,185
$729,755
$804,135
$841,325
$1,027,275
$1,213,225
$1,361,985
Ohio
80-99.99
85.1
$332,562
$371,601
$449,679
$527,757
$605,835
$683,913
$801,030
$879,108
$918,147
$1,113,342
$1,308,537
$1,464,693
Ohio
100 <
145.0
$588,292
$663,476
$813,844
$964,212
$1,114,580
$1,264,948
$1,490,500
$1,640,868
$1,716,052
$2,091,972
$2,467,892
$2,768,628
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oklahoma
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oklahoma
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oklahoma
30-39.99
34.0
$201,238
$233,771
$298,837
$363,903
$428,969
$494,035
$591,634
$656,700
$689,233
$851,898
$1,014,563
$1,144,695
Oklahoma
40-59.99
46.0
$246,506
$280,235
$347,693
$415,151
$482,609
$550,067
$651,254
$718,712
$752,441
$921,086
$1,089,731
$1,224,647
Oklahoma
60-79.99
69.0
$367,737
$418,433
$519,825
$621,217
$722,609
$824,001
$976,089
$1,077,481
$1,128,177
$1,381,657
$1,635,137
$1,837,921
Oklahoma
80-99.99
85.1
$428,691
$481,211
$586,251
$691,291
$796,331
$901,371
$1,058,931
$1,163,971
$1,216,491
$1,479,091
$1,741,691
$1,951,771
Oklahoma
100 <
145.0
$761,974
$864,158
$1,068,526
$1,272,894
$1,477,262
$1,681,630
$1,988,182
$2,192,550
$2,294,734
$2,805,654
$3,316,574
$3,725,310
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-150

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Oregon
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Oregon
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Oregon
30-39.99
34.0
$87,833
$109,247
$152,075
$194,903
$237,731
$280,559
$344,801
$387,629
$409,043
$516,113
$623,183
$708,839
Oregon
40-59.99
46.0
$104,956
$128,537
$175,699
$222,861
$270,023
$317,185
$387,928
$435,090
$458,671
$576,576
$694,481
$788,805
Oregon
60-79.99
69.0
$167,639
$205,444
$281,054
$356,664
$432,274
$507,884
$621,299
$696,909
$734,714
$923,739
$1,112,764
$1,263,984
Oregon
80-99.99
85.1
$189,822
$229,744
$309,588
$389,432
$469,276
$549,120
$668,886
$748,730
$788,652
$988,262
$1,187,872
$1,347,560
Oregon
100 <
145.0
$344,868
$421,344
$574,296
$727,248
$880,200
$1,033,152
$1,262,580
$1,415,532
$1,492,008
$1,874,388
$2,256,768
$2,562,672
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Pennsylvania
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Pennsylvania
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Pennsylvania
30-39.99
34.0
$107,172
$128,716
$171,804
$214,892
$257,980
$301,068
$365,700
$408,788
$430,332
$538,052
$645,772
$731,948
Pennsylvania
40-59.99
46.0
$162,115
$197,074
$266,992
$336,910
$406,828
$476,746
$581,623
$651,541
$686,500
$861,295
$1,036,090
$1,175,926
Pennsylvania
60-79.99
69.0
$206,810
$244,803
$320,789
$396,775
$472,761
$548,747
$662,726
$738,712
$776,705
$966,670
$1,156,635
$1,308,607
Pennsylvania
80-99.99
85.1
$273,053
$328,334
$438,896
$549,458
$660,020
$770,582
$936,425
$1,046,987
$1,102,268
$1,378,673
$1,655,078
$1,876,202
Pennsylvania
100 <
145.0
$427,184
$504,054
$657,794
$811,534
$965,274
$1,119,014
$1,349,624
$1,503,364
$1,580,234
$1,964,584
$2,348,934
$2,656,414
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Rhode Island
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Rhode Island
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Rhode Island
30-39.99
34.0
$167,670
$189,669
$233,667
$277,665
$321,663
$365,661
$431,658
$475,656
$497,655
$607,650
$717,645
$805,641
Rhode Island
40-59.99
46.0
$243,786
$279,182
$349,974
$420,766
$491,558
$562,350
$668,538
$739,330
$774,726
$951,706
$1,128,686
$1,270,270
Rhode Island
60-79.99
69.0
$329,317
$367,965
$445,261
$522,557
$599,853
$677,149
$793,093
$870,389
$909,037
$1,102,277
$1,295,517
$1,450,109
Rhode Island
80-99.99
85.1
$424,255
$480,455
$592,855
$705,255
$817,655
$930,055
$1,098,655
$1,211,055
$1,267,255
$1,548,255
$1,829,255
$2,054,055
Rhode Island
100 <
145.0
$684,626
$762,874
$919,370
$1,075,866
$1,232,362
$1,388,858
$1,623,602
$1,780,098
$1,858,346
$2,249,586
$2,640,826
$2,953,818
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-151

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Carolina
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
South Carolina
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Carolina
30-39.99
34.0
$192,972
$226,810
$294,486
$362,162
$429,838
$497,514
$599,028
$666,704
$700,542
$869,732
$1,038,922
$1,174,274
South Carolina
40-59.99
46.0
$235,449
$271,070
$342,312
$413,554
$484,796
$556,038
$662,901
$734,143
$769,764
$947,869
$1,125,974
$1,268,458
South Carolina
60-79.99
69.0
$351,499
$405,381
$513,145
$620,909
$728,673
$836,437
$998,083
$1,105,847
$1,159,729
$1,429,139
$1,698,549
$1,914,077
South Carolina
80-99.99
85.1
$408,624
$465,033
$577,851
$690,669
$803,487
$916,305
$1,085,532
$1,198,350
$1,254,759
$1,536,804
$1,818,849
$2,044,485
South Carolina
100 <
145.0
$727,834
$836,696
$1,054,420
$1,272,144
$1,489,868
$1,707,592
$2,034,178
$2,251,902
$2,360,764
$2,905,074
$3,449,384
$3,884,832
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
South Dakota
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
South Dakota
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
South Dakota
30-39.99
34.0
$67,400
$85,153
$120,659
$156,165
$191,671
$227,177
$280,436
$315,942
$333,695
$422,460
$511,225
$582,237
South Dakota
40-59.99
46.0
$77,264
$95,844
$133,004
$170,164
$207,324
$244,484
$300,224
$337,384
$355,964
$448,864
$541,764
$616,084
South Dakota
60-79.99
69.0
$128,314
$160,831
$225,865
$290,899
$355,933
$420,967
$518,518
$583,552
$616,069
$778,654
$941,239
$1,071,307
South Dakota
80-99.99
85.1
$141,226
$174,531
$241,141
$307,751
$374,361
$440,971
$540,886
$607,496
$640,801
$807,326
$973,851
$1,107,071
South Dakota
100 <
145.0
$262,244
$327,622
$458,378
$589,134
$719,890
$850,646
$1,046,780
$1,177,536
$1,242,914
$1,569,804
$1,896,694
$2,158,206
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Tennessee
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Tennessee
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Tennessee
30-39.99
34.0
$146,759
$168,957
$213,353
$257,749
$302,145
$346,541
$413,135
$457,531
$479,729
$590,719
$701,709
$790,501
Tennessee
40-59.99
46.0
$215,542
$251,254
$322,678
$394,102
$465,526
$536,950
$644,086
$715,510
$751,222
$929,782
$1,108,342
$1,251,190
Tennessee
60-79.99
69.0
$286,763
$325,698
$403,568
$481,438
$559,308
$637,178
$753,983
$831,853
$870,788
$1,065,463
$1,260,138
$1,415,878
1-152

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$371,820
$428,422
$541,626
$654,830
$768,034
$881,238
$1,051,044
$1,164,248
$1,220,850
$1,503,860
$1,786,870
$2,013,278
Tennessee
100 <
145.0
$665,126
$774,318
$992,702
$1,211,086
$1,429,470
$1,647,854
$1,975,430
$2,193,814
$2,303,006
$2,848,966
$3,394,926
$3,831,694
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Texas
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Texas
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Texas
30-39.99
34.0
$228,468
$260,971
$325,977
$390,983
$455,989
$520,995
$618,504
$683,510
$716,013
$878,528
$1,041,043
$1,171,055
Texas
40-59.99
46.0
$283,346
$317,034
$384,410
$451,786
$519,162
$586,538
$687,602
$754,978
$788,666
$957,106
$1,125,546
$1,260,298
Texas
60-79.99
69.0
$422,988
$473,614
$574,866
$676,118
$777,370
$878,622
$1,030,500
$1,131,752
$1,182,378
$1,435,508
$1,688,638
$1,891,142
Texas
80-99.99
85.1
$529,212
$594,232
$724,272
$854,312
$984,352
$1,114,392
$1,309,452
$1,439,492
$1,504,512
$1,829,612
$2,154,712
$2,414,792
Texas
100 <
145.0
$878,084
$980,122
$1,184,198
$1,388,274
$1,592,350
$1,796,426
$2,102,540
$2,306,616
$2,408,654
$2,918,844
$3,429,034
$3,837,186
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
$2,679
Utah
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Utah
20-29.99
23.0
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
$4,602
Utah
30-39.99
34.0
$41,571
$59,100
$94,158
$129,216
$164,274
$199,332
$251,919
$286,977
$304,506
$392,151
$479,796
$549,912
Utah
40-59.99
46.0
$42,319
$60,596
$97,150
$133,704
$170,258
$206,812
$261,643
$298,197
$316,474
$407,859
$499,244
$572,352
Utah
60-79.99
69.0
$43,753
$63,464
$102,886
$142,308
$181,730
$221,152
$280,285
$319,707
$339,418
$437,973
$536,528
$615,372
Utah
80-99.99
85.1
$44,832
$65,622
$107,202
$148,782
$190,362
$231,942
$294,312
$335,892
$356,682
$460,632
$564,582
$647,742
Utah
100 <
145.0
$88,092
$128,100
$208,116
$288,132
$368,148
$448,164
$568,188
$648,204
$688,212
$888,252
$1,088,292
$1,248,324
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Vermont
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Vermont
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
1-153

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$123,752
$144,188
$185,060
$225,932
$266,804
$307,676
$368,984
$409,856
$430,292
$532,472
$634,652
$716,396
Vermont
40-59.99
46.0
$153,479
$175,662
$220,028
$264,394
$308,760
$353,126
$419,675
$464,041
$486,224
$597,139
$708,054
$796,786
Vermont
60-79.99
69.0
$241,111
$277,508
$350,302
$423,096
$495,890
$568,684
$677,875
$750,669
$787,066
$969,051
$1,151,036
$1,296,624
Vermont
80-99.99
85.1
$280,313
$318,373
$394,493
$470,613
$546,733
$622,853
$737,033
$813,153
$851,213
$1,041,513
$1,231,813
$1,384,053
Vermont
100 <
145.0
$499,266
$572,782
$719,814
$866,846
$1,013,878
$1,160,910
$1,381,458
$1,528,490
$1,602,006
$1,969,586
$2,337,166
$2,631,230
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Virginia
30-39.99
34.0
$124,587
$145,947
$188,667
$231,387
$274,107
$316,827
$380,907
$423,627
$444,987
$551,787
$658,587
$744,027
Virginia
40-59.99
46.0
$185,750
$220,533
$290,099
$359,665
$429,231
$498,797
$603,146
$672,712
$707,495
$881,410
$1,055,325
$1,194,457
Virginia
60-79.99
69.0
$242,261
$279,989
$355,445
$430,901
$506,357
$581,813
$694,997
$770,453
$808,181
$996,821
$1,185,461
$1,336,373
Virginia
80-99.99
85.1
$316,731
$371,641
$481,461
$591,281
$701,101
$810,921
$975,651
$1,085,471
$1,140,381
$1,414,931
$1,689,481
$1,909,121
Virginia
100 <
145.0
$501,682
$577,996
$730,624
$883,252
$1,035,880
$1,188,508
$1,417,450
$1,570,078
$1,646,392
$2,027,962
$2,409,532
$2,714,788
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Washington
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Washington
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Washington
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Washington
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Washington
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Washington
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Washington
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-154

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
West Virginia
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
West Virginia
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
West Virginia
30-39.99
34.0
$92,253
$113,973
$157,413
$200,853
$244,293
$287,733
$352,893
$396,333
$418,053
$526,653
$635,253
$722,133
West Virginia
40-59.99
46.0
$110,938
$134,934
$182,926
$230,918
$278,910
$326,902
$398,890
$446,882
$470,878
$590,858
$710,838
$806,822
West Virginia
60-79.99
69.0
$176,430
$214,676
$291,168
$367,660
$444,152
$520,644
$635,382
$711,874
$750,120
$941,350
$1,132,580
$1,285,564
West Virginia
80-99.99
85.1
$200,665
$241,131
$322,063
$402,995
$483,927
$564,859
$686,257
$767,189
$807,655
$1,009,985
$1,212,315
$1,374,179
West Virginia
100 <
145.0
$363,342
$440,744
$595,548
$750,352
$905,156
$1,059,960
$1,292,166
$1,446,970
$1,524,372
$1,911,382
$2,298,392
$2,608,000
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wisconsin
15-19.99
17.0
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
$3,904
Wisconsin
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wisconsin
30-39.99
34.0
$135,437
$155,504
$195,638
$235,772
$275,906
$316,040
$376,241
$416,375
$436,442
$536,777
$637,112
$717,380
Wisconsin
40-59.99
46.0
$169,287
$190,971
$234,339
$277,707
$321,075
$364,443
$429,495
$472,863
$494,547
$602,967
$711,387
$798,123
Wisconsin
60-79.99
69.0
$265,041
$300,907
$372,639
$444,371
$516,103
$587,835
$695,433
$767,165
$803,031
$982,361
$1,161,691
$1,305,155
Wisconsin
80-99.99
85.1
$309,827
$347,232
$422,042
$496,852
$571,662
$646,472
$758,687
$833,497
$870,902
$1,057,927
$1,244,952
$1,394,572
Wisconsin
100 <
145.0
$549,554
$621,954
$766,754
$911,554
$1,056,354
$1,201,154
$1,418,354
$1,563,154
$1,635,554
$1,997,554
$2,359,554
$2,649,154
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
$3,026
Wyoming
15-19.99
17.0
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
$3,261
Wyoming
20-29.99
23.0
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
$5,296
Wyoming
30-39.99
34.0
$63,288
$80,843
$115,953
$151,063
$186,173
$221,283
$273,948
$309,058
$326,613
$414,388
$502,163
$572,383
Wyoming
40-59.99
46.0
$71,701
$90,013
$126,637
$163,261
$199,885
$236,509
$291,445
$328,069
$346,381
$437,941
$529,501
$602,749
Wyoming
60-79.99
69.0
$87,827
$107,591
$147,119
$186,647
$226,175
$265,703
$324,995
$364,523
$384,287
$483,107
$581,927
$660,983
Wyoming
80-99.99
85.1
$99,189
$120,044
$161,754
$203,464
$245,174
$286,884
$349,449
$391,159
$412,014
$516,289
$620,564
$703,984
Wyoming
100 <
145.0
$180,710
$220,828
$301,064
$381,300
$461,536
$541,772
$662,126
$742,362
$782,480
$983,070
$1,183,660
$1,344,132
1-155

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Alabama
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Alabama
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Alabama
30-39.99
34.0
$301,621
$335,830
$404,248
$472,666
$541,084
$609,502
$712,129
$780,547
$814,756
$985,801
$1,156,846
$1,293,682
Alabama
40-59.99
46.0
$382,444
$418,566
$490,810
$563,054
$635,298
$707,542
$815,908
$888,152
$924,274
$1,104,884
$1,285,494
$1,429,982
Alabama
60-79.99
69.0
$572,096
$626,833
$736,307
$845,781
$955,255
$1,064,729
$1,228,940
$1,338,414
$1,393,151
$1,666,836
$1,940,521
$2,159,469
Alabama
80-99.99
85.1
$712,538
$782,054
$921,086
$1,060,118
$1,199,150
$1,338,182
$1,546,730
$1,685,762
$1,755,278
$2,102,858
$2,450,438
$2,728,502
Alabama
100 <
145.0
$1,191,406
$1,302,064
$1,523,380
$1,744,696
$1,966,012
$2,187,328
$2,519,302
$2,740,618
$2,851,276
$3,404,566
$3,957,856
$4,400,488
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Alaska
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Alaska
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Alaska
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Alaska
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Alaska
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Alaska
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Alaska
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Arizona
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Arizona
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
Arizona
30-39.99
34.0
$40,503
$56,964
$89,886
$122,808
$155,730
$188,652
$238,035
$270,957
$287,418
$369,723
$452,028
$517,872
1-156

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$40,976
$57,910
$91,778
$125,646
$159,514
$193,382
$244,184
$278,052
$294,986
$379,656
$464,326
$532,062
Arizona
60-79.99
69.0
$41,738
$59,434
$94,826
$130,218
$165,610
$201,002
$254,090
$289,482
$307,178
$395,658
$484,138
$554,922
Arizona
80-99.99
85.1
$42,272
$60,502
$96,962
$133,422
$169,882
$206,342
$261,032
$297,492
$315,722
$406,872
$498,022
$570,942
Arizona
100 <
145.0
$83,708
$119,332
$190,580
$261,828
$333,076
$404,324
$511,196
$582,444
$618,068
$796,188
$974,308
$1,116,804
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Arkansas
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Arkansas
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Arkansas
30-39.99
34.0
$247,380
$281,442
$349,566
$417,690
$485,814
$553,938
$656,124
$724,248
$758,310
$928,620
$1,098,930
$1,235,178
Arkansas
40-59.99
46.0
$309,059
$344,982
$416,828
$488,674
$560,520
$632,366
$740,135
$811,981
$847,904
$1,027,519
$1,207,134
$1,350,826
Arkansas
60-79.99
69.0
$461,977
$516,375
$625,171
$733,967
$842,763
$951,559
$1,114,753
$1,223,549
$1,277,947
$1,549,937
$1,821,927
$2,039,519
Arkansas
80-99.99
85.1
$576,549
$645,472
$783,318
$921,164
$1,059,010
$1,196,856
$1,403,625
$1,541,471
$1,610,394
$1,955,009
$2,299,624
$2,575,316
Arkansas
100 <
145.0
$960,000
$1,069,948
$1,289,844
$1,509,740
$1,729,636
$1,949,532
$2,279,376
$2,499,272
$2,609,220
$3,158,960
$3,708,700
$4,148,492
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
California
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
California
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
California
30-39.99
34.0
$53,522
$71,609
$107,783
$143,957
$180,131
$216,305
$270,566
$306,740
$324,827
$415,262
$505,697
$578,045
California
40-59.99
46.0
$58,489
$77,521
$115,585
$153,649
$191,713
$229,777
$286,873
$324,937
$343,969
$439,129
$534,289
$610,417
California
60-79.99
69.0
$68,083
$89,002
$130,840
$172,678
$214,516
$256,354
$319,111
$360,949
$381,868
$486,463
$591,058
$674,734
California
80-99.99
85.1
$106,250
$140,149
$207,947
$275,745
$343,543
$411,341
$513,038
$580,836
$614,735
$784,230
$953,725
$1,089,321
California
100 <
145.0
$139,064
$181,454
$266,234
$351,014
$435,794
$520,574
$647,744
$732,524
$774,914
$986,864
$1,198,814
$1,368,374
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
1-157

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Colorado
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Colorado
30-39.99
34.0
$83,542
$100,889
$135,583
$170,277
$204,971
$239,665
$291,706
$326,400
$343,747
$430,482
$517,217
$586,605
Colorado
40-59.99
46.0
$99,103
$117,134
$153,196
$189,258
$225,320
$261,382
$315,475
$351,537
$369,568
$459,723
$549,878
$622,002
Colorado
60-79.99
69.0
$128,930
$148,272
$186,956
$225,640
$264,324
$303,008
$361,034
$399,718
$419,060
$515,770
$612,480
$689,848
Colorado
80-99.99
85.1
$181,924
$214,508
$279,676
$344,844
$410,012
$475,180
$572,932
$638,100
$670,684
$833,604
$996,524
$1,126,860
Colorado
100 <
145.0
$266,936
$306,018
$384,182
$462,346
$540,510
$618,674
$735,920
$814,084
$853,166
$1,048,576
$1,243,986
$1,400,314
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Connecticut
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Connecticut
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Connecticut
30-39.99
34.0
$122,986
$144,937
$188,839
$232,741
$276,643
$320,545
$386,398
$430,300
$452,251
$562,006
$671,761
$759,565
Connecticut
40-59.99
46.0
$183,353
$218,704
$289,406
$360,108
$430,810
$501,512
$607,565
$678,267
$713,618
$890,373
$1,067,128
$1,208,532
Connecticut
60-79.99
69.0
$238,664
$277,243
$354,401
$431,559
$508,717
$585,875
$701,612
$778,770
$817,349
$1,010,244
$1,203,139
$1,357,455
Connecticut
80-99.99
85.1
$312,440
$368,544
$480,752
$592,960
$705,168
$817,376
$985,688
$1,097,896
$1,154,000
$1,434,520
$1,715,040
$1,939,456
Connecticut
100 <
145.0
$494,126
$572,230
$728,438
$884,646
$1,040,854
$1,197,062
$1,431,374
$1,587,582
$1,665,686
$2,056,206
$2,446,726
$2,759,142
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Delaware
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Delaware
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Delaware
30-39.99
34.0
$132,713
$154,462
$197,960
$241,458
$284,956
$328,454
$393,701
$437,199
$458,948
$567,693
$676,438
$763,434
Delaware
40-59.99
46.0
$196,591
$231,747
$302,059
$372,371
$442,683
$512,995
$618,463
$688,775
$723,931
$899,711
$1,075,491
$1,216,115
Delaware
60-79.99
69.0
$258,523
$296,811
$373,387
$449,963
$526,539
$603,115
$717,979
$794,555
$832,843
$1,024,283
$1,215,723
$1,368,875
Delaware
80-99.99
85.1
$336,882
$392,577
$503,967
$615,357
$726,747
$838,137
$1,005,222
$1,116,612
$1,172,307
$1,450,782
$1,729,257
$1,952,037
Delaware
100 <
145.0
$535,856
$613,346
$768,326
$923,306
$1,078,286
$1,233,266
$1,465,736
$1,620,716
$1,698,206
$2,085,656
$2,473,106
$2,783,066
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-158

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
District of
Columbia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
District of
Columbia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
District of
Columbia
30-39.99
34.0
$129,530
$151,092
$194,216
$237,340
$280,464
$323,588
$388,274
$431,398
$452,960
$560,770
$668,580
$754,828
District of
Columbia
40-59.99
46.0
$192,358
$227,335
$297,289
$367,243
$437,197
$507,151
$612,082
$682,036
$717,013
$891,898
$1,066,783
$1,206,691
District of
Columbia
60-79.99
69.0
$252,173
$290,192
$366,230
$442,268
$518,306
$594,344
$708,401
$784,439
$822,458
$1,012,553
$1,202,648
$1,354,724
District of
Columbia
80-99.99
85.1
$329,005
$384,323
$494,959
$605,595
$716,231
$826,867
$992,821
$1,103,457
$1,158,775
$1,435,365
$1,711,955
$1,933,227
District of
Columbia
100 <
145.0
$522,512
$599,438
$753,290
$907,142
$1,060,994
$1,214,846
$1,445,624
$1,599,476
$1,676,402
$2,061,032
$2,445,662
$2,753,366
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Florida
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Florida
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Florida
30-39.99
34.0
$298,010
$333,684
$405,032
$476,380
$547,728
$619,076
$726,098
$797,446
$833,120
$1,011,490
$1,189,860
$1,332,556
Florida
40-59.99
46.0
$411,975
$464,703
$570,159
$675,615
$781,071
$886,527
$1,044,711
$1,150,167
$1,202,895
$1,466,535
$1,730,175
$1,941,087
Florida
60-79.99
69.0
$596,686
$666,523
$806,197
$945,871
$1,085,545
$1,225,219
$1,434,730
$1,574,404
$1,644,241
$1,993,426
$2,342,611
$2,621,959
Florida
80-99.99
85.1
$703,187
$776,058
$921,800
$1,067,542
$1,213,284
$1,359,026
$1,577,639
$1,723,381
$1,796,252
$2,160,607
$2,524,962
$2,816,446
Florida
100 <
145.0
$1,239,676
$1,380,668
$1,662,652
$1,944,636
$2,226,620
$2,508,604
$2,931,580
$3,213,564
$3,354,556
$4,059,516
$4,764,476
$5,328,444
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
1-159

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Georgia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Georgia
30-39.99
34.0
$239,665
$274,062
$342,856
$411,650
$480,444
$549,238
$652,429
$721,223
$755,620
$927,605
$1,099,590
$1,237,178
Georgia
40-59.99
46.0
$298,620
$334,996
$407,748
$480,500
$553,252
$626,004
$735,132
$807,884
$844,260
$1,026,140
$1,208,020
$1,353,524
Georgia
60-79.99
69.0
$446,411
$501,581
$611,921
$722,261
$832,601
$942,941
$1,108,451
$1,218,791
$1,273,961
$1,549,811
$1,825,661
$2,046,341
Georgia
80-99.99
85.1
$525,682
$583,679
$699,673
$815,667
$931,661
$1,047,655
$1,221,646
$1,337,640
$1,395,637
$1,685,622
$1,975,607
$2,207,595
Georgia
100 <
145.0
$927,286
$1,038,854
$1,261,990
$1,485,126
$1,708,262
$1,931,398
$2,266,102
$2,489,238
$2,600,806
$3,158,646
$3,716,486
$4,162,758
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Hawaii
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Hawaii
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Hawaii
30-39.99
34.0
$281,995
$312,902
$374,716
$436,530
$498,344
$560,158
$652,879
$714,693
$745,600
$900,135
$1,054,670
$1,178,298
Hawaii
40-59.99
46.0
$389,635
$435,242
$526,456
$617,670
$708,884
$800,098
$936,919
$1,028,133
$1,073,740
$1,301,775
$1,529,810
$1,712,238
Hawaii
60-79.99
69.0
$564,242
$624,462
$744,902
$865,342
$985,782
$1,106,222
$1,286,882
$1,407,322
$1,467,542
$1,768,642
$2,069,742
$2,310,622
Hawaii
80-99.99
85.1
$663,502
$724,842
$847,522
$970,202
$1,092,882
$1,215,562
$1,399,582
$1,522,262
$1,583,602
$1,890,302
$2,197,002
$2,442,362
Hawaii
100 <
145.0
$1,171,542
$1,292,372
$1,534,032
$1,775,692
$2,017,352
$2,259,012
$2,621,502
$2,863,162
$2,983,992
$3,588,142
$4,192,292
$4,675,612
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Idaho
15-19.99
17.0
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
Idaho
20-29.99
23.0
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
Idaho
30-39.99
34.0
$25,552
$41,712
$74,032
$106,352
$138,672
$170,992
$219,472
$251,792
$267,952
$348,752
$429,552
$494,192
Idaho
40-59.99
46.0
$41,684
$59,326
$94,610
$129,894
$165,178
$200,462
$253,388
$288,672
$306,314
$394,524
$482,734
$553,302
Idaho
60-79.99
69.0
$42,801
$61,560
$99,078
$136,596
$174,114
$211,632
$267,909
$305,427
$324,186
$417,981
$511,776
$586,812
Idaho
80-99.99
85.1
$43,582
$63,122
$102,202
$141,282
$180,362
$219,442
$278,062
$317,142
$336,682
$434,382
$532,082
$610,242
Idaho
100 <
145.0
$85,940
$123,796
$199,508
$275,220
$350,932
$426,644
$540,212
$615,924
$653,780
$843,060
$1,032,340
$1,183,764
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-160

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Illinois
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Illinois
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Illinois
30-39.99
34.0
$111,224
$131,520
$172,112
$212,704
$253,296
$293,888
$354,776
$395,368
$415,664
$517,144
$618,624
$699,808
Illinois
40-59.99
46.0
$168,087
$201,848
$269,370
$336,892
$404,414
$471,936
$573,219
$640,741
$674,502
$843,307
$1,012,112
$1,147,156
Illinois
60-79.99
69.0
$215,769
$251,965
$324,357
$396,749
$469,141
$541,533
$650,121
$722,513
$758,709
$939,689
$1,120,669
$1,265,453
Illinois
80-99.99
85.1
$249,057
$286,869
$362,493
$438,117
$513,741
$589,365
$702,801
$778,425
$816,237
$1,005,297
$1,194,357
$1,345,605
Illinois
100 <
145.0
$446,010
$519,104
$665,292
$811,480
$957,668
$1,103,856
$1,323,138
$1,469,326
$1,542,420
$1,907,890
$2,273,360
$2,565,736
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Indiana
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Indiana
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Indiana
30-39.99
34.0
$160,873
$182,136
$224,662
$267,188
$309,714
$352,240
$416,029
$458,555
$479,818
$586,133
$692,448
$777,500
Indiana
40-59.99
46.0
$234,881
$269,571
$338,951
$408,331
$477,711
$547,091
$651,161
$720,541
$755,231
$928,681
$1,102,131
$1,240,891
Indiana
60-79.99
69.0
$315,958
$353,546
$428,722
$503,898
$579,074
$654,250
$767,014
$842,190
$879,778
$1,067,718
$1,255,658
$1,406,010
Indiana
80-99.99
85.1
$407,601
$462,315
$571,743
$681,171
$790,599
$900,027
$1,064,169
$1,173,597
$1,228,311
$1,501,881
$1,775,451
$1,994,307
Indiana
100 <
145.0
$656,554
$732,574
$884,614
$1,036,654
$1,188,694
$1,340,734
$1,568,794
$1,720,834
$1,796,854
$2,176,954
$2,557,054
$2,861,134
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Iowa
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Iowa
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Iowa
30-39.99
34.0
$132,155
$152,250
$192,440
$232,630
$272,820
$313,010
$373,295
$413,485
$433,580
$534,055
$634,530
$714,910
Iowa
40-59.99
46.0
$196,485
$230,053
$297,189
$364,325
$431,461
$498,597
$599,301
$666,437
$700,005
$867,845
$1,035,685
$1,169,957
Iowa
60-79.99
69.0
$258,365
$294,271
$366,083
$437,895
$509,707
$581,519
$689,237
$761,049
$796,955
$976,485
$1,156,015
$1,299,639
Iowa
80-99.99
85.1
$336,112
$388,294
$492,658
$597,022
$701,386
$805,750
$962,296
$1,066,660
$1,118,842
$1,379,752
$1,640,662
$1,849,390
1-161

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$535,526
$608,012
$752,984
$897,956
$1,042,928
$1,187,900
$1,405,358
$1,550,330
$1,622,816
$1,985,246
$2,347,676
$2,637,620
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Kansas
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Kansas
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Kansas
30-39.99
34.0
$150,798
$171,624
$213,276
$254,928
$296,580
$338,232
$400,710
$442,362
$463,188
$567,318
$671,448
$754,752
Kansas
40-59.99
46.0
$221,421
$255,691
$324,231
$392,771
$461,311
$529,851
$632,661
$701,201
$735,471
$906,821
$1,078,171
$1,215,251
Kansas
60-79.99
69.0
$295,769
$332,728
$406,646
$480,564
$554,482
$628,400
$739,277
$813,195
$850,154
$1,034,949
$1,219,744
$1,367,580
Kansas
80-99.99
85.1
$382,596
$436,429
$544,095
$651,761
$759,427
$867,093
$1,028,592
$1,136,258
$1,190,091
$1,459,256
$1,728,421
$1,943,753
Kansas
100 <
145.0
$683,138
$787,262
$995,510
$1,203,758
$1,412,006
$1,620,254
$1,932,626
$2,140,874
$2,244,998
$2,765,618
$3,286,238
$3,702,734
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Kentucky
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Kentucky
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Kentucky
30-39.99
34.0
$122,202
$144,241
$188,319
$232,397
$276,475
$320,553
$386,670
$430,748
$452,787
$562,982
$673,177
$761,333
Kentucky
40-59.99
46.0
$182,256
$217,690
$288,558
$359,426
$430,294
$501,162
$607,464
$678,332
$713,766
$890,936
$1,068,106
$1,209,842
Kentucky
60-79.99
69.0
$237,020
$275,725
$353,135
$430,545
$507,955
$585,365
$701,480
$778,890
$817,595
$1,011,120
$1,204,645
$1,359,465
Kentucky
80-99.99
85.1
$310,433
$366,713
$479,273
$591,833
$704,393
$816,953
$985,793
$1,098,353
$1,154,633
$1,436,033
$1,717,433
$1,942,553
Kentucky
100 <
145.0
$490,670
$569,038
$725,774
$882,510
$1,039,246
$1,195,982
$1,431,086
$1,587,822
$1,666,190
$2,058,030
$2,449,870
$2,763,342
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Louisiana
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Louisiana
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Louisiana
30-39.99
34.0
$348,247
$383,462
$453,892
$524,322
$594,752
$665,182
$770,827
$841,257
$876,472
$1,052,547
$1,228,622
$1,369,482
1-162

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$480,047
$532,260
$636,686
$741,112
$845,538
$949,964
$1,106,603
$1,211,029
$1,263,242
$1,524,307
$1,785,372
$1,994,224
Louisiana
60-79.99
69.0
$698,664
$767,597
$905,463
$1,043,329
$1,181,195
$1,319,061
$1,525,860
$1,663,726
$1,732,659
$2,077,324
$2,421,989
$2,697,721
Louisiana
80-99.99
85.1
$863,783
$950,570
$1,124,144
$1,297,718
$1,471,292
$1,644,866
$1,905,227
$2,078,801
$2,165,588
$2,599,523
$3,033,458
$3,380,606
Louisiana
100 <
145.0
$1,454,450
$1,594,016
$1,873,148
$2,152,280
$2,431,412
$2,710,544
$3,129,242
$3,408,374
$3,547,940
$4,245,770
$4,943,600
$5,501,864
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Maine
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Maine
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Maine
30-39.99
34.0
$115,900
$137,451
$180,553
$223,655
$266,757
$309,859
$374,512
$417,614
$439,165
$546,920
$654,675
$740,879
Maine
40-59.99
46.0
$173,921
$208,887
$278,819
$348,751
$418,683
$488,615
$593,513
$663,445
$698,411
$873,241
$1,048,071
$1,187,935
Maine
60-79.99
69.0
$224,519
$262,522
$338,528
$414,534
$490,540
$566,546
$680,555
$756,561
$794,564
$984,579
$1,174,594
$1,326,606
Maine
80-99.99
85.1
$259,975
$300,141
$380,473
$460,805
$541,137
$621,469
$741,967
$822,299
$862,465
$1,063,295
$1,264,125
$1,424,789
Maine
100 <
145.0
$464,400
$541,292
$695,076
$848,860
$1,002,644
$1,156,428
$1,387,104
$1,540,888
$1,617,780
$2,002,240
$2,386,700
$2,694,268
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Maryland
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Maryland
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Maryland
30-39.99
34.0
$129,609
$151,250
$194,532
$237,814
$281,096
$324,378
$389,301
$432,583
$454,224
$562,429
$670,634
$757,198
Maryland
40-59.99
46.0
$192,434
$227,487
$297,593
$367,699
$437,805
$507,911
$613,070
$683,176
$718,229
$893,494
$1,068,759
$1,208,971
Maryland
60-79.99
69.0
$252,287
$290,420
$366,686
$442,952
$519,218
$595,484
$709,883
$786,149
$824,282
$1,014,947
$1,205,612
$1,358,144
Maryland
80-99.99
85.1
$329,165
$384,643
$495,599
$606,555
$717,511
$828,467
$994,901
$1,105,857
$1,161,335
$1,438,725
$1,716,115
$1,938,027
Maryland
100 <
145.0
$522,750
$599,914
$754,242
$908,570
$1,062,898
$1,217,226
$1,448,718
$1,603,046
$1,680,210
$2,066,030
$2,451,850
$2,760,506
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
1-163

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Massachusetts
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Massachusetts
30-39.99
34.0
$121,219
$142,878
$186,196
$229,514
$272,832
$316,150
$381,127
$424,445
$446,104
$554,399
$662,694
$749,330
Massachusetts
40-59.99
46.0
$181,075
$216,145
$286,285
$356,425
$426,565
$496,705
$601,915
$672,055
$707,125
$882,475
$1,057,825
$1,198,105
Massachusetts
60-79.99
69.0
$235,248
$273,406
$349,722
$426,038
$502,354
$578,670
$693,144
$769,460
$807,618
$998,408
$1,189,198
$1,341,830
Massachusetts
80-99.99
85.1
$308,155
$363,668
$474,694
$585,720
$696,746
$807,772
$974,311
$1,085,337
$1,140,850
$1,418,415
$1,695,980
$1,918,032
Massachusetts
100 <
145.0
$486,946
$564,164
$718,600
$873,036
$1,027,472
$1,181,908
$1,413,562
$1,567,998
$1,645,216
$2,031,306
$2,417,396
$2,726,268
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Michigan
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Michigan
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Michigan
30-39.99
34.0
$64,658
$84,477
$124,115
$163,753
$203,391
$243,029
$302,486
$342,124
$361,943
$461,038
$560,133
$639,409
Michigan
40-59.99
46.0
$73,629
$95,079
$137,979
$180,879
$223,779
$266,679
$331,029
$373,929
$395,379
$502,629
$609,879
$695,679
Michigan
60-79.99
69.0
$121,657
$157,274
$228,508
$299,742
$370,976
$442,210
$549,061
$620,295
$655,912
$833,997
$1,012,082
$1,154,550
Michigan
80-99.99
85.1
$132,986
$170,084
$244,280
$318,476
$392,672
$466,868
$578,162
$652,358
$689,456
$874,946
$1,060,436
$1,208,828
Michigan
100 <
145.0
$248,238
$320,116
$463,872
$607,628
$751,384
$895,140
$1,110,774
$1,254,530
$1,326,408
$1,685,798
$2,045,188
$2,332,700
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Minnesota
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Minnesota
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Minnesota
30-39.99
34.0
$102,831
$122,427
$161,619
$200,811
$240,003
$279,195
$337,983
$377,175
$396,771
$494,751
$592,731
$671,115
Minnesota
40-59.99
46.0
$125,276
$146,425
$188,723
$231,021
$273,319
$315,617
$379,064
$421,362
$442,511
$548,256
$654,001
$738,597
Minnesota
60-79.99
69.0
$199,133
$234,305
$304,649
$374,993
$445,337
$515,681
$621,197
$691,541
$726,713
$902,573
$1,078,433
$1,219,121
Minnesota
80-99.99
85.1
$228,694
$265,397
$338,803
$412,209
$485,615
$559,021
$669,130
$742,536
$779,239
$962,754
$1,146,269
$1,293,081
Minnesota
100 <
145.0
$411,312
$482,516
$624,924
$767,332
$909,740
$1,052,148
$1,265,760
$1,408,168
$1,479,372
$1,835,392
$2,191,412
$2,476,228
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-164

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Mississippi
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Mississippi
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Mississippi
30-39.99
34.0
$269,529
$304,093
$373,221
$442,349
$511,477
$580,605
$684,297
$753,425
$787,989
$960,809
$1,133,629
$1,271,885
Mississippi
40-59.99
46.0
$339,026
$375,629
$448,835
$522,041
$595,247
$668,453
$778,262
$851,468
$888,071
$1,071,086
$1,254,101
$1,400,513
Mississippi
60-79.99
69.0
$507,065
$562,621
$673,733
$784,845
$895,957
$1,007,069
$1,173,737
$1,284,849
$1,340,405
$1,618,185
$1,895,965
$2,118,189
Mississippi
80-99.99
85.1
$632,212
$702,617
$843,427
$984,237
$1,125,047
$1,265,857
$1,477,072
$1,617,882
$1,688,287
$2,040,312
$2,392,337
$2,673,957
Mississippi
100 <
145.0
$1,118,294
$1,254,636
$1,527,320
$1,800,004
$2,072,688
$2,345,372
$2,754,398
$3,027,082
$3,163,424
$3,845,134
$4,526,844
$5,072,212
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Missour

15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Missour

20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Missour

30-39.99
34.0
$188,001
$220,938
$286,812
$352,686
$418,560
$484,434
$583,245
$649,119
$682,056
$846,741
$1,011,426
$1,143,174
Missour

40-59.99
46.0
$228,598
$262,874
$331,426
$399,978
$468,530
$537,082
$639,910
$708,462
$742,738
$914,118
$1,085,498
$1,222,602
Missour

60-79.99
69.0
$340,986
$392,614
$495,870
$599,126
$702,382
$805,638
$960,522
$1,063,778
$1,115,406
$1,373,546
$1,631,686
$1,838,198
Missour

80-99.99
85.1
$395,873
$449,718
$557,408
$665,098
$772,788
$880,478
$1,042,013
$1,149,703
$1,203,548
$1,472,773
$1,741,998
$1,957,378
Missour

100 <
145.0
$705,760
$809,904
$1,018,192
$1,226,480
$1,434,768
$1,643,056
$1,955,488
$2,163,776
$2,267,920
$2,788,640
$3,309,360
$3,725,936
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Montana
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Montana
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
Montana
30-39.99
34.0
$44,476
$61,600
$95,848
$130,096
$164,344
$198,592
$249,964
$284,212
$301,336
$386,956
$472,576
$541,072
Montana
40-59.99
46.0
$46,250
$63,980
$99,440
$134,900
$170,360
$205,820
$259,010
$294,470
$312,200
$400,850
$489,500
$560,420
Montana
60-79.99
69.0
$49,649
$68,539
$106,319
$144,099
$181,879
$219,659
$276,329
$314,109
$332,999
$427,449
$521,899
$597,459
Montana
80-99.99
85.1
$52,028
$71,730
$111,134
$150,538
$189,942
$229,346
$288,452
$327,856
$347,558
$446,068
$544,578
$623,386
1-165

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$100,332
$138,466
$214,734
$291,002
$367,270
$443,538
$557,940
$634,208
$672,342
$863,012
$1,053,682
$1,206,218
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Nebraska
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Nebraska
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Nebraska
30-39.99
34.0
$130,340
$149,872
$188,936
$228,000
$267,064
$306,128
$364,724
$403,788
$423,320
$520,980
$618,640
$696,768
Nebraska
40-59.99
46.0
$162,493
$183,555
$225,679
$267,803
$309,927
$352,051
$415,237
$457,361
$478,423
$583,733
$689,043
$773,291
Nebraska
60-79.99
69.0
$254,996
$290,075
$360,233
$430,391
$500,549
$570,707
$675,944
$746,102
$781,181
$956,576
$1,131,971
$1,272,287
Nebraska
80-99.99
85.1
$297,593
$334,182
$407,360
$480,538
$553,716
$626,894
$736,661
$809,839
$846,428
$1,029,373
$1,212,318
$1,358,674
Nebraska
100 <
145.0
$528,458
$599,218
$740,738
$882,258
$1,023,778
$1,165,298
$1,377,578
$1,519,098
$1,589,858
$1,943,658
$2,297,458
$2,580,498
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
$5,165
Nevada
15-19.99
17.0
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
$5,814
Nevada
20-29.99
23.0
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
$9,574
Nevada
30-39.99
34.0
$21,467
$33,542
$57,692
$81,842
$105,992
$130,142
$166,367
$190,517
$202,592
$262,967
$323,342
$371,642
Nevada
40-59.99
46.0
$40,128
$56,214
$88,386
$120,558
$152,730
$184,902
$233,160
$265,332
$281,418
$361,848
$442,278
$506,622
Nevada
60-79.99
69.0
$40,505
$56,968
$89,894
$122,820
$155,746
$188,672
$238,061
$270,987
$287,450
$369,765
$452,080
$517,932
Nevada
80-99.99
85.1
$40,768
$57,494
$90,946
$124,398
$157,850
$191,302
$241,480
$274,932
$291,658
$375,288
$458,918
$525,822
Nevada
100 <
145.0
$81,124
$114,164
$180,244
$246,324
$312,404
$378,484
$477,604
$543,684
$576,724
$741,924
$907,124
$1,039,284
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
1-166

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
New
Hampshire
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
New
Hampshire
30-39.99
34.0
$100,485
$121,827
$164,511
$207,195
$249,879
$292,563
$356,589
$399,273
$420,615
$527,325
$634,035
$719,403
New
Hampshire
40-59.99
46.0
$122,074
$145,558
$192,526
$239,494
$286,462
$333,430
$403,882
$450,850
$474,334
$591,754
$709,174
$803,110
New
Hampshire
60-79.99
69.0
$193,358
$231,060
$306,464
$381,868
$457,272
$532,676
$645,782
$721,186
$758,888
$947,398
$1,135,908
$1,286,716
New
Hampshire
80-99.99
85.1
$221,418
$261,088
$340,428
$419,768
$499,108
$578,448
$697,458
$776,798
$816,468
$1,014,818
$1,213,168
$1,371,848
New
Hampshire
100 <
145.0
$398,914
$475,172
$627,688
$780,204
$932,720
$1,085,236
$1,314,010
$1,466,526
$1,542,784
$1,924,074
$2,305,364
$2,610,396
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
New Jersey
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
New Jersey
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
New Jersey
30-39.99
34.0
$182,466
$204,793
$249,447
$294,101
$338,755
$383,409
$450,390
$495,044
$517,371
$629,006
$740,641
$829,949
New Jersey
40-59.99
46.0
$263,801
$299,637
$371,309
$442,981
$514,653
$586,325
$693,833
$765,505
$801,341
$980,521
$1,159,701
$1,303,045
New Jersey
60-79.99
69.0
$359,152
$398,273
$476,515
$554,757
$632,999
$711,241
$828,604
$906,846
$945,967
$1,141,572
$1,337,177
$1,493,661
New Jersey
80-99.99
85.1
$461,131
$517,993
$631,717
$745,441
$859,165
$972,889
$1,143,475
$1,257,199
$1,314,061
$1,598,371
$1,882,681
$2,110,129
New Jersey
100 <
145.0
$747,322
$826,562
$985,042
$1,143,522
$1,302,002
$1,460,482
$1,698,202
$1,856,682
$1,935,922
$2,332,122
$2,728,322
$3,045,282
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
New Mexico
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
New Mexico
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
New Mexico
30-39.99
34.0
$41,702
$59,362
$94,682
$130,002
$165,322
$200,642
$253,622
$288,942
$306,602
$394,902
$483,202
$553,842
New Mexico
40-59.99
46.0
$42,496
$60,950
$97,858
$134,766
$171,674
$208,582
$263,944
$300,852
$319,306
$411,576
$503,846
$577,662
New Mexico
60-79.99
69.0
$44,094
$64,146
$104,250
$144,354
$184,458
$224,562
$284,718
$324,822
$344,874
$445,134
$545,394
$625,602
1-167

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$45,160
$66,278
$108,514
$150,750
$192,986
$235,222
$298,576
$340,812
$361,930
$467,520
$573,110
$657,582
New Mexico
100 <
145.0
$88,650
$129,216
$210,348
$291,480
$372,612
$453,744
$575,442
$656,574
$697,140
$899,970
$1,102,800
$1,265,064
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
New York
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
New York
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
New York
30-39.99
34.0
$115,924
$136,783
$178,501
$220,219
$261,937
$303,655
$366,232
$407,950
$428,809
$533,104
$637,399
$720,835
New York
40-59.99
46.0
$174,226
$208,528
$277,132
$345,736
$414,340
$482,944
$585,850
$654,454
$688,756
$860,266
$1,031,776
$1,168,984
New York
60-79.99
69.0
$224,974
$261,980
$335,992
$410,004
$484,016
$558,028
$669,046
$743,058
$780,064
$965,094
$1,150,124
$1,298,148
New York
80-99.99
85.1
$260,412
$299,224
$376,848
$454,472
$532,096
$609,720
$726,156
$803,780
$842,592
$1,036,652
$1,230,712
$1,385,960
New York
100 <
145.0
$465,354
$540,150
$689,742
$839,334
$988,926
$1,138,518
$1,362,906
$1,512,498
$1,587,294
$1,961,274
$2,335,254
$2,634,438
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
North Carolina
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
North Carolina
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
North Carolina
30-39.99
34.0
$181,867
$203,640
$247,186
$290,732
$334,278
$377,824
$443,143
$486,689
$508,462
$617,327
$726,192
$813,284
North Carolina
40-59.99
46.0
$263,084
$298,263
$368,621
$438,979
$509,337
$579,695
$685,232
$755,590
$790,769
$966,664
$1,142,559
$1,283,275
North Carolina
60-79.99
69.0
$358,262
$396,584
$473,228
$549,872
$626,516
$703,160
$818,126
$894,770
$933,092
$1,124,702
$1,316,312
$1,469,600
North Carolina
80-99.99
85.1
$459,901
$515,645
$627,133
$738,621
$850,109
$961,597
$1,128,829
$1,240,317
$1,296,061
$1,574,781
$1,853,501
$2,076,477
North Carolina
100 <
145.0
$745,456
$823,020
$978,148
$1,133,276
$1,288,404
$1,443,532
$1,676,224
$1,831,352
$1,908,916
$2,296,736
$2,684,556
$2,994,812
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
North Dakota
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
North Dakota
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
1-168

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$41,793
$59,544
$95,046
$130,548
$166,050
$201,552
$254,805
$290,307
$308,058
$396,813
$485,568
$556,572
North Dakota
40-59.99
46.0
$42,620
$61,198
$98,354
$135,510
$172,666
$209,822
$265,556
$302,712
$321,290
$414,180
$507,070
$581,382
North Dakota
60-79.99
69.0
$44,280
$64,518
$104,994
$145,470
$185,946
$226,422
$287,136
$327,612
$347,850
$449,040
$550,230
$631,182
North Dakota
80-99.99
85.1
$45,389
$66,736
$109,430
$152,124
$194,818
$237,512
$301,553
$344,247
$365,594
$472,329
$579,064
$664,452
North Dakota
100 <
145.0
$89,042
$130,000
$211,916
$293,832
$375,748
$457,664
$580,538
$662,454
$703,412
$908,202
$1,112,992
$1,276,824
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Ohio
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Ohio
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Ohio
30-39.99
34.0
$144,787
$165,774
$207,748
$249,722
$291,696
$333,670
$396,631
$438,605
$459,592
$564,527
$669,462
$753,410
Ohio
40-59.99
46.0
$182,013
$205,017
$251,025
$297,033
$343,041
$389,049
$458,061
$504,069
$527,073
$642,093
$757,113
$849,129
Ohio
60-79.99
69.0
$283,475
$320,665
$395,045
$469,425
$543,805
$618,185
$729,755
$804,135
$841,325
$1,027,275
$1,213,225
$1,361,985
Ohio
80-99.99
85.1
$332,562
$371,601
$449,679
$527,757
$605,835
$683,913
$801,030
$879,108
$918,147
$1,113,342
$1,308,537
$1,464,693
Ohio
100 <
145.0
$588,292
$663,476
$813,844
$964,212
$1,114,580
$1,264,948
$1,490,500
$1,640,868
$1,716,052
$2,091,972
$2,467,892
$2,768,628
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Oklahoma
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Oklahoma
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Oklahoma
30-39.99
34.0
$201,238
$233,771
$298,837
$363,903
$428,969
$494,035
$591,634
$656,700
$689,233
$851,898
$1,014,563
$1,144,695
Oklahoma
40-59.99
46.0
$246,506
$280,235
$347,693
$415,151
$482,609
$550,067
$651,254
$718,712
$752,441
$921,086
$1,089,731
$1,224,647
Oklahoma
60-79.99
69.0
$367,737
$418,433
$519,825
$621,217
$722,609
$824,001
$976,089
$1,077,481
$1,128,177
$1,381,657
$1,635,137
$1,837,921
Oklahoma
80-99.99
85.1
$428,691
$481,211
$586,251
$691,291
$796,331
$901,371
$1,058,931
$1,163,971
$1,216,491
$1,479,091
$1,741,691
$1,951,771
Oklahoma
100 <
145.0
$761,974
$864,158
$1,068,526
$1,272,894
$1,477,262
$1,681,630
$1,988,182
$2,192,550
$2,294,734
$2,805,654
$3,316,574
$3,725,310
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-169

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Oregon
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Oregon
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Oregon
30-39.99
34.0
$87,833
$109,247
$152,075
$194,903
$237,731
$280,559
$344,801
$387,629
$409,043
$516,113
$623,183
$708,839
Oregon
40-59.99
46.0
$104,956
$128,537
$175,699
$222,861
$270,023
$317,185
$387,928
$435,090
$458,671
$576,576
$694,481
$788,805
Oregon
60-79.99
69.0
$167,639
$205,444
$281,054
$356,664
$432,274
$507,884
$621,299
$696,909
$734,714
$923,739
$1,112,764
$1,263,984
Oregon
80-99.99
85.1
$189,822
$229,744
$309,588
$389,432
$469,276
$549,120
$668,886
$748,730
$788,652
$988,262
$1,187,872
$1,347,560
Oregon
100 <
145.0
$344,868
$421,344
$574,296
$727,248
$880,200
$1,033,152
$1,262,580
$1,415,532
$1,492,008
$1,874,388
$2,256,768
$2,562,672
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Pennsylvania
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Pennsylvania
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Pennsylvania
30-39.99
34.0
$107,172
$128,716
$171,804
$214,892
$257,980
$301,068
$365,700
$408,788
$430,332
$538,052
$645,772
$731,948
Pennsylvania
40-59.99
46.0
$162,115
$197,074
$266,992
$336,910
$406,828
$476,746
$581,623
$651,541
$686,500
$861,295
$1,036,090
$1,175,926
Pennsylvania
60-79.99
69.0
$206,810
$244,803
$320,789
$396,775
$472,761
$548,747
$662,726
$738,712
$776,705
$966,670
$1,156,635
$1,308,607
Pennsylvania
80-99.99
85.1
$273,053
$328,334
$438,896
$549,458
$660,020
$770,582
$936,425
$1,046,987
$1,102,268
$1,378,673
$1,655,078
$1,876,202
Pennsylvania
100 <
145.0
$427,184
$504,054
$657,794
$811,534
$965,274
$1,119,014
$1,349,624
$1,503,364
$1,580,234
$1,964,584
$2,348,934
$2,656,414
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Rhode Island
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Rhode Island
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Rhode Island
30-39.99
34.0
$167,670
$189,669
$233,667
$277,665
$321,663
$365,661
$431,658
$475,656
$497,655
$607,650
$717,645
$805,641
Rhode Island
40-59.99
46.0
$243,786
$279,182
$349,974
$420,766
$491,558
$562,350
$668,538
$739,330
$774,726
$951,706
$1,128,686
$1,270,270
Rhode Island
60-79.99
69.0
$329,317
$367,965
$445,261
$522,557
$599,853
$677,149
$793,093
$870,389
$909,037
$1,102,277
$1,295,517
$1,450,109
Rhode Island
80-99.99
85.1
$424,255
$480,455
$592,855
$705,255
$817,655
$930,055
$1,098,655
$1,211,055
$1,267,255
$1,548,255
$1,829,255
$2,054,055
Rhode Island
100 <
145.0
$684,626
$762,874
$919,370
$1,075,866
$1,232,362
$1,388,858
$1,623,602
$1,780,098
$1,858,346
$2,249,586
$2,640,826
$2,953,818
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-170

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
South Carolina
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
South Carolina
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
South Carolina
30-39.99
34.0
$192,972
$226,810
$294,486
$362,162
$429,838
$497,514
$599,028
$666,704
$700,542
$869,732
$1,038,922
$1,174,274
South Carolina
40-59.99
46.0
$235,449
$271,070
$342,312
$413,554
$484,796
$556,038
$662,901
$734,143
$769,764
$947,869
$1,125,974
$1,268,458
South Carolina
60-79.99
69.0
$351,499
$405,381
$513,145
$620,909
$728,673
$836,437
$998,083
$1,105,847
$1,159,729
$1,429,139
$1,698,549
$1,914,077
South Carolina
80-99.99
85.1
$408,624
$465,033
$577,851
$690,669
$803,487
$916,305
$1,085,532
$1,198,350
$1,254,759
$1,536,804
$1,818,849
$2,044,485
South Carolina
100 <
145.0
$727,834
$836,696
$1,054,420
$1,272,144
$1,489,868
$1,707,592
$2,034,178
$2,251,902
$2,360,764
$2,905,074
$3,449,384
$3,884,832
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
South Dakota
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
South Dakota
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
South Dakota
30-39.99
34.0
$67,400
$85,153
$120,659
$156,165
$191,671
$227,177
$280,436
$315,942
$333,695
$422,460
$511,225
$582,237
South Dakota
40-59.99
46.0
$77,264
$95,844
$133,004
$170,164
$207,324
$244,484
$300,224
$337,384
$355,964
$448,864
$541,764
$616,084
South Dakota
60-79.99
69.0
$128,314
$160,831
$225,865
$290,899
$355,933
$420,967
$518,518
$583,552
$616,069
$778,654
$941,239
$1,071,307
South Dakota
80-99.99
85.1
$141,226
$174,531
$241,141
$307,751
$374,361
$440,971
$540,886
$607,496
$640,801
$807,326
$973,851
$1,107,071
South Dakota
100 <
145.0
$262,244
$327,622
$458,378
$589,134
$719,890
$850,646
$1,046,780
$1,177,536
$1,242,914
$1,569,804
$1,896,694
$2,158,206
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Tennessee
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Tennessee
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Tennessee
30-39.99
34.0
$146,759
$168,957
$213,353
$257,749
$302,145
$346,541
$413,135
$457,531
$479,729
$590,719
$701,709
$790,501
Tennessee
40-59.99
46.0
$215,542
$251,254
$322,678
$394,102
$465,526
$536,950
$644,086
$715,510
$751,222
$929,782
$1,108,342
$1,251,190
Tennessee
60-79.99
69.0
$286,763
$325,698
$403,568
$481,438
$559,308
$637,178
$753,983
$831,853
$870,788
$1,065,463
$1,260,138
$1,415,878
1-171

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$371,820
$428,422
$541,626
$654,830
$768,034
$881,238
$1,051,044
$1,164,248
$1,220,850
$1,503,860
$1,786,870
$2,013,278
Tennessee
100 <
145.0
$665,126
$774,318
$992,702
$1,211,086
$1,429,470
$1,647,854
$1,975,430
$2,193,814
$2,303,006
$2,848,966
$3,394,926
$3,831,694
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Texas
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Texas
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Texas
30-39.99
34.0
$228,468
$260,971
$325,977
$390,983
$455,989
$520,995
$618,504
$683,510
$716,013
$878,528
$1,041,043
$1,171,055
Texas
40-59.99
46.0
$283,346
$317,034
$384,410
$451,786
$519,162
$586,538
$687,602
$754,978
$788,666
$957,106
$1,125,546
$1,260,298
Texas
60-79.99
69.0
$422,988
$473,614
$574,866
$676,118
$777,370
$878,622
$1,030,500
$1,131,752
$1,182,378
$1,435,508
$1,688,638
$1,891,142
Texas
80-99.99
85.1
$529,212
$594,232
$724,272
$854,312
$984,352
$1,114,392
$1,309,452
$1,439,492
$1,504,512
$1,829,612
$2,154,712
$2,414,792
Texas
100 <
145.0
$878,084
$980,122
$1,184,198
$1,388,274
$1,592,350
$1,796,426
$2,102,540
$2,306,616
$2,408,654
$2,918,844
$3,429,034
$3,837,186
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
$5,579
Utah
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Utah
20-29.99
23.0
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
$10,402
Utah
30-39.99
34.0
$41,571
$59,100
$94,158
$129,216
$164,274
$199,332
$251,919
$286,977
$304,506
$392,151
$479,796
$549,912
Utah
40-59.99
46.0
$42,319
$60,596
$97,150
$133,704
$170,258
$206,812
$261,643
$298,197
$316,474
$407,859
$499,244
$572,352
Utah
60-79.99
69.0
$43,753
$63,464
$102,886
$142,308
$181,730
$221,152
$280,285
$319,707
$339,418
$437,973
$536,528
$615,372
Utah
80-99.99
85.1
$44,832
$65,622
$107,202
$148,782
$190,362
$231,942
$294,312
$335,892
$356,682
$460,632
$564,582
$647,742
Utah
100 <
145.0
$88,092
$128,100
$208,116
$288,132
$368,148
$448,164
$568,188
$648,204
$688,212
$888,252
$1,088,292
$1,248,324
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Vermont
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Vermont
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
1-172

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$123,752
$144,188
$185,060
$225,932
$266,804
$307,676
$368,984
$409,856
$430,292
$532,472
$634,652
$716,396
Vermont
40-59.99
46.0
$153,479
$175,662
$220,028
$264,394
$308,760
$353,126
$419,675
$464,041
$486,224
$597,139
$708,054
$796,786
Vermont
60-79.99
69.0
$241,111
$277,508
$350,302
$423,096
$495,890
$568,684
$677,875
$750,669
$787,066
$969,051
$1,151,036
$1,296,624
Vermont
80-99.99
85.1
$280,313
$318,373
$394,493
$470,613
$546,733
$622,853
$737,033
$813,153
$851,213
$1,041,513
$1,231,813
$1,384,053
Vermont
100 <
145.0
$499,266
$572,782
$719,814
$866,846
$1,013,878
$1,160,910
$1,381,458
$1,528,490
$1,602,006
$1,969,586
$2,337,166
$2,631,230
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Virginia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Virginia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Virginia
30-39.99
34.0
$124,587
$145,947
$188,667
$231,387
$274,107
$316,827
$380,907
$423,627
$444,987
$551,787
$658,587
$744,027
Virginia
40-59.99
46.0
$185,750
$220,533
$290,099
$359,665
$429,231
$498,797
$603,146
$672,712
$707,495
$881,410
$1,055,325
$1,194,457
Virginia
60-79.99
69.0
$242,261
$279,989
$355,445
$430,901
$506,357
$581,813
$694,997
$770,453
$808,181
$996,821
$1,185,461
$1,336,373
Virginia
80-99.99
85.1
$316,731
$371,641
$481,461
$591,281
$701,101
$810,921
$975,651
$1,085,471
$1,140,381
$1,414,931
$1,689,481
$1,909,121
Virginia
100 <
145.0
$501,682
$577,996
$730,624
$883,252
$1,035,880
$1,188,508
$1,417,450
$1,570,078
$1,646,392
$2,027,962
$2,409,532
$2,714,788
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Washington
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Washington
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Washington
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Washington
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Washington
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Washington
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Washington
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-173

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 2 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
West Virginia
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
West Virginia
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
West Virginia
30-39.99
34.0
$92,253
$113,973
$157,413
$200,853
$244,293
$287,733
$352,893
$396,333
$418,053
$526,653
$635,253
$722,133
West Virginia
40-59.99
46.0
$110,938
$134,934
$182,926
$230,918
$278,910
$326,902
$398,890
$446,882
$470,878
$590,858
$710,838
$806,822
West Virginia
60-79.99
69.0
$176,430
$214,676
$291,168
$367,660
$444,152
$520,644
$635,382
$711,874
$750,120
$941,350
$1,132,580
$1,285,564
West Virginia
80-99.99
85.1
$200,665
$241,131
$322,063
$402,995
$483,927
$564,859
$686,257
$767,189
$807,655
$1,009,985
$1,212,315
$1,374,179
West Virginia
100 <
145.0
$363,342
$440,744
$595,548
$750,352
$905,156
$1,059,960
$1,292,166
$1,446,970
$1,524,372
$1,911,382
$2,298,392
$2,608,000
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Wisconsin
15-19.99
17.0
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
$8,784
Wisconsin
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Wisconsin
30-39.99
34.0
$135,437
$155,504
$195,638
$235,772
$275,906
$316,040
$376,241
$416,375
$436,442
$536,777
$637,112
$717,380
Wisconsin
40-59.99
46.0
$169,287
$190,971
$234,339
$277,707
$321,075
$364,443
$429,495
$472,863
$494,547
$602,967
$711,387
$798,123
Wisconsin
60-79.99
69.0
$265,041
$300,907
$372,639
$444,371
$516,103
$587,835
$695,433
$767,165
$803,031
$982,361
$1,161,691
$1,305,155
Wisconsin
80-99.99
85.1
$309,827
$347,232
$422,042
$496,852
$571,662
$646,472
$758,687
$833,497
$870,902
$1,057,927
$1,244,952
$1,394,572
Wisconsin
100 <
145.0
$549,554
$621,954
$766,754
$911,554
$1,056,354
$1,201,154
$1,418,354
$1,563,154
$1,635,554
$1,997,554
$2,359,554
$2,649,154
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
$6,620
Wyoming
15-19.99
17.0
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
$6,855
Wyoming
20-29.99
23.0
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
$12,484
Wyoming
30-39.99
34.0
$63,288
$80,843
$115,953
$151,063
$186,173
$221,283
$273,948
$309,058
$326,613
$414,388
$502,163
$572,383
Wyoming
40-59.99
46.0
$71,701
$90,013
$126,637
$163,261
$199,885
$236,509
$291,445
$328,069
$346,381
$437,941
$529,501
$602,749
Wyoming
60-79.99
69.0
$87,827
$107,591
$147,119
$186,647
$226,175
$265,703
$324,995
$364,523
$384,287
$483,107
$581,927
$660,983
Wyoming
80-99.99
85.1
$99,189
$120,044
$161,754
$203,464
$245,174
$286,884
$349,449
$391,159
$412,014
$516,289
$620,564
$703,984
Wyoming
100 <
145.0
$180,710
$220,828
$301,064
$381,300
$461,536
$541,772
$662,126
$742,362
$782,480
$983,070
$1,183,660
$1,344,132
1-174

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$120,881
$138,810
$174,668
$210,526
$246,384
$282,242
$336,029
$371,887
$389,816
$479,461
$569,106
$640,822
Alabama
15-19.99
17.0
$154,810
$173,789
$211,747
$249,705
$287,663
$325,621
$382,558
$420,516
$439,495
$534,390
$629,285
$705,201
Alabama
20-29.99
23.0
$195,601
$215,916
$256,546
$297,176
$337,806
$378,436
$439,381
$480,011
$500,326
$601,901
$703,476
$784,736
Alabama
30-39.99
34.0
$301,621
$335,830
$404,248
$472,666
$541,084
$609,502
$712,129
$780,547
$814,756
$985,801
$1,156,846
$1,293,682
Alabama
40-59.99
46.0
$382,444
$418,566
$490,810
$563,054
$635,298
$707,542
$815,908
$888,152
$924,274
$1,104,884
$1,285,494
$1,429,982
Alabama
60-79.99
69.0
$572,096
$626,833
$736,307
$845,781
$955,255
$1,064,729
$1,228,940
$1,338,414
$1,393,151
$1,666,836
$1,940,521
$2,159,469
Alabama
80-99.99
85.1
$712,538
$782,054
$921,086
$1,060,118
$1,199,150
$1,338,182
$1,546,730
$1,685,762
$1,755,278
$2,102,858
$2,450,438
$2,728,502
Alabama
100 <
145.0
$1,191,406
$1,302,064
$1,523,380
$1,744,696
$1,966,012
$2,187,328
$2,519,302
$2,740,618
$2,851,276
$3,404,566
$3,957,856
$4,400,488
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$50,316
$67,065
$100,563
$134,061
$167,559
$201,057
$251,304
$284,802
$301,551
$385,296
$469,041
$536,037
Alaska
15-19.99
17.0
$76,266
$94,242
$130,194
$166,146
$202,098
$238,050
$291,978
$327,930
$345,906
$435,786
$525,666
$597,570
Alaska
20-29.99
23.0
$89,259
$108,141
$145,905
$183,669
$221,433
$259,197
$315,843
$353,607
$372,489
$466,899
$561,309
$636,837
Alaska
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Alaska
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Alaska
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Alaska
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Alaska
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$20,890
$32,388
$55,384
$78,380
$101,376
$124,372
$158,866
$181,862
$193,360
$250,850
$308,340
$354,332
Arizona
15-19.99
17.0
$21,494
$33,596
$57,800
$82,004
$106,208
$130,412
$166,718
$190,922
$203,024
$263,534
$324,044
$372,452
Arizona
20-29.99
23.0
$22,218
$35,044
$60,696
$86,348
$112,000
$137,652
$176,130
$201,782
$214,608
$278,738
$342,868
$394,172
Arizona
30-39.99
34.0
$40,503
$56,964
$89,886
$122,808
$155,730
$188,652
$238,035
$270,957
$287,418
$369,723
$452,028
$517,872
1-175

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$40,976
$57,910
$91,778
$125,646
$159,514
$193,382
$244,184
$278,052
$294,986
$379,656
$464,326
$532,062
Arizona
60-79.99
69.0
$41,738
$59,434
$94,826
$130,218
$165,610
$201,002
$254,090
$289,482
$307,178
$395,658
$484,138
$554,922
Arizona
80-99.99
85.1
$42,272
$60,502
$96,962
$133,422
$169,882
$206,342
$261,032
$297,492
$315,722
$406,872
$498,022
$570,942
Arizona
100 <
145.0
$83,708
$119,332
$190,580
$261,828
$333,076
$404,324
$511,196
$582,444
$618,068
$796,188
$974,308
$1,116,804
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$101,716
$119,572
$155,284
$190,996
$226,708
$262,420
$315,988
$351,700
$369,556
$458,836
$548,116
$619,540
Arkansas
15-19.99
17.0
$127,660
$146,536
$184,288
$222,040
$259,792
$297,544
$354,172
$391,924
$410,800
$505,180
$599,560
$675,064
Arkansas
20-29.99
23.0
$158,868
$179,043
$219,393
$259,743
$300,093
$340,443
$400,968
$441,318
$461,493
$562,368
$663,243
$743,943
Arkansas
30-39.99
34.0
$247,380
$281,442
$349,566
$417,690
$485,814
$553,938
$656,124
$724,248
$758,310
$928,620
$1,098,930
$1,235,178
Arkansas
40-59.99
46.0
$309,059
$344,982
$416,828
$488,674
$560,520
$632,366
$740,135
$811,981
$847,904
$1,027,519
$1,207,134
$1,350,826
Arkansas
60-79.99
69.0
$461,977
$516,375
$625,171
$733,967
$842,763
$951,559
$1,114,753
$1,223,549
$1,277,947
$1,549,937
$1,821,927
$2,039,519
Arkansas
80-99.99
85.1
$576,549
$645,472
$783,318
$921,164
$1,059,010
$1,196,856
$1,403,625
$1,541,471
$1,610,394
$1,955,009
$2,299,624
$2,575,316
Arkansas
100 <
145.0
$960,000
$1,069,948
$1,289,844
$1,509,740
$1,729,636
$1,949,532
$2,279,376
$2,499,272
$2,609,220
$3,158,960
$3,708,700
$4,148,492
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$26,955
$40,497
$67,581
$94,665
$121,749
$148,833
$189,459
$216,543
$230,085
$297,795
$365,505
$419,673
California
15-19.99
17.0
$46,412
$63,085
$96,431
$129,777
$163,123
$196,469
$246,488
$279,834
$296,507
$379,872
$463,237
$529,929
California
20-29.99
23.0
$48,970
$66,191
$100,633
$135,075
$169,517
$203,959
$255,622
$290,064
$307,285
$393,390
$479,495
$548,379
California
30-39.99
34.0
$53,522
$71,609
$107,783
$143,957
$180,131
$216,305
$270,566
$306,740
$324,827
$415,262
$505,697
$578,045
California
40-59.99
46.0
$58,489
$77,521
$115,585
$153,649
$191,713
$229,777
$286,873
$324,937
$343,969
$439,129
$534,289
$610,417
California
60-79.99
69.0
$68,083
$89,002
$130,840
$172,678
$214,516
$256,354
$319,111
$360,949
$381,868
$486,463
$591,058
$674,734
California
80-99.99
85.1
$106,250
$140,149
$207,947
$275,745
$343,543
$411,341
$513,038
$580,836
$614,735
$784,230
$953,725
$1,089,321
California
100 <
145.0
$139,064
$181,454
$266,234
$351,014
$435,794
$520,574
$647,744
$732,524
$774,914
$986,864
$1,198,814
$1,368,374
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$36,811
$49,352
$74,434
$99,516
$124,598
$149,680
$187,303
$212,385
$224,926
$287,631
$350,336
$400,500
1-176

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$61,421
$77,724
$110,330
$142,936
$175,542
$208,148
$257,057
$289,663
$305,966
$387,481
$468,996
$534,208
Colorado
20-29.99
23.0
$69,202
$85,847
$119,137
$152,427
$185,717
$219,007
$268,942
$302,232
$318,877
$402,102
$485,327
$551,907
Colorado
30-39.99
34.0
$83,542
$100,889
$135,583
$170,277
$204,971
$239,665
$291,706
$326,400
$343,747
$430,482
$517,217
$586,605
Colorado
40-59.99
46.0
$99,103
$117,134
$153,196
$189,258
$225,320
$261,382
$315,475
$351,537
$369,568
$459,723
$549,878
$622,002
Colorado
60-79.99
69.0
$128,930
$148,272
$186,956
$225,640
$264,324
$303,008
$361,034
$399,718
$419,060
$515,770
$612,480
$689,848
Colorado
80-99.99
85.1
$181,924
$214,508
$279,676
$344,844
$410,012
$475,180
$572,932
$638,100
$670,684
$833,604
$996,524
$1,126,860
Colorado
100 <
145.0
$266,936
$306,018
$384,182
$462,346
$540,510
$618,674
$735,920
$814,084
$853,166
$1,048,576
$1,243,986
$1,400,314
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$68,908
$86,600
$121,984
$157,368
$192,752
$228,136
$281,212
$316,596
$334,288
$422,748
$511,208
$581,976
Connecticut
15-19.99
17.0
$81,182
$99,825
$137,111
$174,397
$211,683
$248,969
$304,898
$342,184
$360,827
$454,042
$547,257
$621,829
Connecticut
20-29.99
23.0
$95,910
$115,694
$155,262
$194,830
$234,398
$273,966
$333,318
$372,886
$392,670
$491,590
$590,510
$669,646
Connecticut
30-39.99
34.0
$122,986
$144,937
$188,839
$232,741
$276,643
$320,545
$386,398
$430,300
$452,251
$562,006
$671,761
$759,565
Connecticut
40-59.99
46.0
$183,353
$218,704
$289,406
$360,108
$430,810
$501,512
$607,565
$678,267
$713,618
$890,373
$1,067,128
$1,208,532
Connecticut
60-79.99
69.0
$238,664
$277,243
$354,401
$431,559
$508,717
$585,875
$701,612
$778,770
$817,349
$1,010,244
$1,203,139
$1,357,455
Connecticut
80-99.99
85.1
$312,440
$368,544
$480,752
$592,960
$705,168
$817,376
$985,688
$1,097,896
$1,154,000
$1,434,520
$1,715,040
$1,939,456
Connecticut
100 <
145.0
$494,126
$572,230
$728,438
$884,646
$1,040,854
$1,197,062
$1,431,374
$1,587,582
$1,665,686
$2,056,206
$2,446,726
$2,759,142
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$72,340
$89,960
$125,200
$160,440
$195,680
$230,920
$283,780
$319,020
$336,640
$424,740
$512,840
$583,320
Delaware
15-19.99
17.0
$86,044
$104,585
$141,667
$178,749
$215,831
$252,913
$308,536
$345,618
$364,159
$456,864
$549,569
$623,733
Delaware
20-29.99
23.0
$102,489
$122,136
$161,430
$200,724
$240,018
$279,312
$338,253
$377,547
$397,194
$495,429
$593,664
$672,252
Delaware
30-39.99
34.0
$132,713
$154,462
$197,960
$241,458
$284,956
$328,454
$393,701
$437,199
$458,948
$567,693
$676,438
$763,434
Delaware
40-59.99
46.0
$196,591
$231,747
$302,059
$372,371
$442,683
$512,995
$618,463
$688,775
$723,931
$899,711
$1,075,491
$1,216,115
Delaware
60-79.99
69.0
$258,523
$296,811
$373,387
$449,963
$526,539
$603,115
$717,979
$794,555
$832,843
$1,024,283
$1,215,723
$1,368,875
Delaware
80-99.99
85.1
$336,882
$392,577
$503,967
$615,357
$726,747
$838,137
$1,005,222
$1,116,612
$1,172,307
$1,450,782
$1,729,257
$1,952,037
Delaware
100 <
145.0
$535,856
$613,346
$768,326
$923,306
$1,078,286
$1,233,266
$1,465,736
$1,620,716
$1,698,206
$2,085,656
$2,473,106
$2,783,066
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-177

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$71,217
$88,771
$123,879
$158,987
$194,095
$229,203
$281,865
$316,973
$334,527
$422,297
$510,067
$580,283
District of
Columbia
15-19.99
17.0
$84,453
$102,901
$139,797
$176,693
$213,589
$250,485
$305,829
$342,725
$361,173
$453,413
$545,653
$619,445
District of
Columbia
20-29.99
23.0
$100,336
$119,857
$158,899
$197,941
$236,983
$276,025
$334,588
$373,630
$393,151
$490,756
$588,361
$666,445
District of
Columbia
30-39.99
34.0
$129,530
$151,092
$194,216
$237,340
$280,464
$323,588
$388,274
$431,398
$452,960
$560,770
$668,580
$754,828
District of
Columbia
40-59.99
46.0
$192,358
$227,335
$297,289
$367,243
$437,197
$507,151
$612,082
$682,036
$717,013
$891,898
$1,066,783
$1,206,691
District of
Columbia
60-79.99
69.0
$252,173
$290,192
$366,230
$442,268
$518,306
$594,344
$708,401
$784,439
$822,458
$1,012,553
$1,202,648
$1,354,724
District of
Columbia
80-99.99
85.1
$329,005
$384,323
$494,959
$605,595
$716,231
$826,867
$992,821
$1,103,457
$1,158,775
$1,435,365
$1,711,955
$1,933,227
District of
Columbia
100 <
145.0
$522,512
$599,438
$753,290
$907,142
$1,060,994
$1,214,846
$1,445,624
$1,599,476
$1,676,402
$2,061,032
$2,445,662
$2,753,366
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$119,756
$138,352
$175,544
$212,736
$249,928
$287,120
$342,908
$380,100
$398,696
$491,676
$584,656
$659,040
Florida
15-19.99
17.0
$153,292
$173,291
$213,289
$253,287
$293,285
$333,283
$393,280
$433,278
$453,277
$553,272
$653,267
$733,263
Florida
20-29.99
23.0
$225,121
$258,598
$325,552
$392,506
$459,460
$526,414
$626,845
$693,799
$727,276
$894,661
$1,062,046
$1,195,954
Florida
30-39.99
34.0
$298,010
$333,684
$405,032
$476,380
$547,728
$619,076
$726,098
$797,446
$833,120
$1,011,490
$1,189,860
$1,332,556
Florida
40-59.99
46.0
$411,975
$464,703
$570,159
$675,615
$781,071
$886,527
$1,044,711
$1,150,167
$1,202,895
$1,466,535
$1,730,175
$1,941,087
Florida
60-79.99
69.0
$596,686
$666,523
$806,197
$945,871
$1,085,545
$1,225,219
$1,434,730
$1,574,404
$1,644,241
$1,993,426
$2,342,611
$2,621,959
Florida
80-99.99
85.1
$703,187
$776,058
$921,800
$1,067,542
$1,213,284
$1,359,026
$1,577,639
$1,723,381
$1,796,252
$2,160,607
$2,524,962
$2,816,446
Florida
100 <
145.0
$1,239,676
$1,380,668
$1,662,652
$1,944,636
$2,226,620
$2,508,604
$2,931,580
$3,213,564
$3,354,556
$4,059,516
$4,764,476
$5,328,444
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$99,042
$117,065
$153,111
$189,157
$225,203
$261,249
$315,318
$351,364
$369,387
$459,502
$549,617
$621,709
1-178

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$123,871
$142,983
$181,207
$219,431
$257,655
$295,879
$353,215
$391,439
$410,551
$506,111
$601,671
$678,119
Georgia
20-29.99
23.0
$153,741
$174,235
$215,223
$256,211
$297,199
$338,187
$399,669
$440,657
$461,151
$563,621
$666,091
$748,067
Georgia
30-39.99
34.0
$239,665
$274,062
$342,856
$411,650
$480,444
$549,238
$652,429
$721,223
$755,620
$927,605
$1,099,590
$1,237,178
Georgia
40-59.99
46.0
$298,620
$334,996
$407,748
$480,500
$553,252
$626,004
$735,132
$807,884
$844,260
$1,026,140
$1,208,020
$1,353,524
Georgia
60-79.99
69.0
$446,411
$501,581
$611,921
$722,261
$832,601
$942,941
$1,108,451
$1,218,791
$1,273,961
$1,549,811
$1,825,661
$2,046,341
Georgia
80-99.99
85.1
$525,682
$583,679
$699,673
$815,667
$931,661
$1,047,655
$1,221,646
$1,337,640
$1,395,637
$1,685,622
$1,975,607
$2,207,595
Georgia
100 <
145.0
$927,286
$1,038,854
$1,261,990
$1,485,126
$1,708,262
$1,931,398
$2,266,102
$2,489,238
$2,600,806
$3,158,646
$3,716,486
$4,162,758
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$113,464
$129,738
$162,286
$194,834
$227,382
$259,930
$308,752
$341,300
$357,574
$438,944
$520,314
$585,410
Hawaii
15-19.99
17.0
$144,335
$161,001
$194,333
$227,665
$260,997
$294,329
$344,327
$377,659
$394,325
$477,655
$560,985
$627,649
Hawaii
20-29.99
23.0
$214,331
$244,627
$305,219
$365,811
$426,403
$486,995
$577,883
$638,475
$668,771
$820,251
$971,731
$1,092,915
Hawaii
30-39.99
34.0
$281,995
$312,902
$374,716
$436,530
$498,344
$560,158
$652,879
$714,693
$745,600
$900,135
$1,054,670
$1,178,298
Hawaii
40-59.99
46.0
$389,635
$435,242
$526,456
$617,670
$708,884
$800,098
$936,919
$1,028,133
$1,073,740
$1,301,775
$1,529,810
$1,712,238
Hawaii
60-79.99
69.0
$564,242
$624,462
$744,902
$865,342
$985,782
$1,106,222
$1,286,882
$1,407,322
$1,467,542
$1,768,642
$2,069,742
$2,310,622
Hawaii
80-99.99
85.1
$663,502
$724,842
$847,522
$970,202
$1,092,882
$1,215,562
$1,399,582
$1,522,262
$1,583,602
$1,890,302
$2,197,002
$2,442,362
Hawaii
100 <
145.0
$1,171,542
$1,292,372
$1,534,032
$1,775,692
$2,017,352
$2,259,012
$2,621,502
$2,863,162
$2,983,992
$3,588,142
$4,192,292
$4,675,612
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$21,563
$33,734
$58,076
$82,418
$106,760
$131,102
$167,615
$191,957
$204,128
$264,983
$325,838
$374,522
Idaho
15-19.99
17.0
$22,447
$35,502
$61,612
$87,722
$113,832
$139,942
$179,107
$205,217
$218,272
$283,547
$348,822
$401,042
Idaho
20-29.99
23.0
$23,558
$37,724
$66,056
$94,388
$122,720
$151,052
$193,550
$221,882
$236,048
$306,878
$377,708
$434,372
Idaho
30-39.99
34.0
$25,552
$41,712
$74,032
$106,352
$138,672
$170,992
$219,472
$251,792
$267,952
$348,752
$429,552
$494,192
Idaho
40-59.99
46.0
$41,684
$59,326
$94,610
$129,894
$165,178
$200,462
$253,388
$288,672
$306,314
$394,524
$482,734
$553,302
Idaho
60-79.99
69.0
$42,801
$61,560
$99,078
$136,596
$174,114
$211,632
$267,909
$305,427
$324,186
$417,981
$511,776
$586,812
Idaho
80-99.99
85.1
$43,582
$63,122
$102,202
$141,282
$180,362
$219,442
$278,062
$317,142
$336,682
$434,382
$532,082
$610,242
Idaho
100 <
145.0
$85,940
$123,796
$199,508
$275,220
$350,932
$426,644
$540,212
$615,924
$653,780
$843,060
$1,032,340
$1,183,764
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-179

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$64,756
$81,863
$116,077
$150,291
$184,505
$218,719
$270,040
$304,254
$321,361
$406,896
$492,431
$560,859
Illinois
15-19.99
17.0
$75,300
$93,115
$128,745
$164,375
$200,005
$235,635
$289,080
$324,710
$342,525
$431,600
$520,675
$591,935
Illinois
20-29.99
23.0
$87,952
$106,616
$143,944
$181,272
$218,600
$255,928
$311,920
$349,248
$367,912
$461,232
$554,552
$629,208
Illinois
30-39.99
34.0
$111,224
$131,520
$172,112
$212,704
$253,296
$293,888
$354,776
$395,368
$415,664
$517,144
$618,624
$699,808
Illinois
40-59.99
46.0
$168,087
$201,848
$269,370
$336,892
$404,414
$471,936
$573,219
$640,741
$674,502
$843,307
$1,012,112
$1,147,156
Illinois
60-79.99
69.0
$215,769
$251,965
$324,357
$396,749
$469,141
$541,533
$650,121
$722,513
$758,709
$939,689
$1,120,669
$1,265,453
Illinois
80-99.99
85.1
$249,057
$286,869
$362,493
$438,117
$513,741
$589,365
$702,801
$778,425
$816,237
$1,005,297
$1,194,357
$1,345,605
Illinois
100 <
145.0
$446,010
$519,104
$665,292
$811,480
$957,668
$1,103,856
$1,323,138
$1,469,326
$1,542,420
$1,907,890
$2,273,360
$2,565,736
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$82,280
$99,729
$134,627
$169,525
$204,423
$239,321
$291,668
$326,566
$344,015
$431,260
$518,505
$588,301
Indiana
15-19.99
17.0
$100,124
$118,422
$155,018
$191,614
$228,210
$264,806
$319,700
$356,296
$374,594
$466,084
$557,574
$630,766
Indiana
20-29.99
23.0
$121,539
$140,857
$179,493
$218,129
$256,765
$295,401
$353,355
$391,991
$411,309
$507,899
$604,489
$681,761
Indiana
30-39.99
34.0
$160,873
$182,136
$224,662
$267,188
$309,714
$352,240
$416,029
$458,555
$479,818
$586,133
$692,448
$777,500
Indiana
40-59.99
46.0
$234,881
$269,571
$338,951
$408,331
$477,711
$547,091
$651,161
$720,541
$755,231
$928,681
$1,102,131
$1,240,891
Indiana
60-79.99
69.0
$315,958
$353,546
$428,722
$503,898
$579,074
$654,250
$767,014
$842,190
$879,778
$1,067,718
$1,255,658
$1,406,010
Indiana
80-99.99
85.1
$407,601
$462,315
$571,743
$681,171
$790,599
$900,027
$1,064,169
$1,173,597
$1,228,311
$1,501,881
$1,775,451
$1,994,307
Indiana
100 <
145.0
$656,554
$732,574
$884,614
$1,036,654
$1,188,694
$1,340,734
$1,568,794
$1,720,834
$1,796,854
$2,176,954
$2,557,054
$2,861,134
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$72,143
$89,179
$123,251
$157,323
$191,395
$225,467
$276,575
$310,647
$327,683
$412,863
$498,043
$566,187
Iowa
15-19.99
17.0
$85,765
$103,479
$138,907
$174,335
$209,763
$245,191
$298,333
$333,761
$351,475
$440,045
$528,615
$599,471
Iowa
20-29.99
23.0
$102,112
$120,640
$157,696
$194,752
$231,808
$268,864
$324,448
$361,504
$380,032
$472,672
$565,312
$639,424
Iowa
30-39.99
34.0
$132,155
$152,250
$192,440
$232,630
$272,820
$313,010
$373,295
$413,485
$433,580
$534,055
$634,530
$714,910
Iowa
40-59.99
46.0
$196,485
$230,053
$297,189
$364,325
$431,461
$498,597
$599,301
$666,437
$700,005
$867,845
$1,035,685
$1,169,957
Iowa
60-79.99
69.0
$258,365
$294,271
$366,083
$437,895
$509,707
$581,519
$689,237
$761,049
$796,955
$976,485
$1,156,015
$1,299,639
Iowa
80-99.99
85.1
$336,112
$388,294
$492,658
$597,022
$701,386
$805,750
$962,296
$1,066,660
$1,118,842
$1,379,752
$1,640,662
$1,849,390
1-180

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$535,526
$608,012
$752,984
$897,956
$1,042,928
$1,187,900
$1,405,358
$1,550,330
$1,622,816
$1,985,246
$2,347,676
$2,637,620
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$78,723
$96,017
$130,605
$165,193
$199,781
$234,369
$286,251
$320,839
$338,133
$424,603
$511,073
$580,249
Kansas
15-19.99
17.0
$95,087
$113,167
$149,327
$185,487
$221,647
$257,807
$312,047
$348,207
$366,287
$456,687
$547,087
$619,407
Kansas
20-29.99
23.0
$114,724
$133,747
$171,793
$209,839
$247,885
$285,931
$343,000
$381,046
$400,069
$495,184
$590,299
$666,391
Kansas
30-39.99
34.0
$150,798
$171,624
$213,276
$254,928
$296,580
$338,232
$400,710
$442,362
$463,188
$567,318
$671,448
$754,752
Kansas
40-59.99
46.0
$221,421
$255,691
$324,231
$392,771
$461,311
$529,851
$632,661
$701,201
$735,471
$906,821
$1,078,171
$1,215,251
Kansas
60-79.99
69.0
$295,769
$332,728
$406,646
$480,564
$554,482
$628,400
$739,277
$813,195
$850,154
$1,034,949
$1,219,744
$1,367,580
Kansas
80-99.99
85.1
$382,596
$436,429
$544,095
$651,761
$759,427
$867,093
$1,028,592
$1,136,258
$1,190,091
$1,459,256
$1,728,421
$1,943,753
Kansas
100 <
145.0
$683,138
$787,262
$995,510
$1,203,758
$1,412,006
$1,620,254
$1,932,626
$2,140,874
$2,244,998
$2,765,618
$3,286,238
$3,702,734
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$68,630
$86,352
$121,796
$157,240
$192,684
$228,128
$281,294
$316,738
$334,460
$423,070
$511,680
$582,568
Kentucky
15-19.99
17.0
$80,789
$99,475
$136,847
$174,219
$211,591
$248,963
$305,021
$342,393
$361,079
$454,509
$547,939
$622,683
Kentucky
20-29.99
23.0
$95,379
$115,222
$154,908
$194,594
$234,280
$273,966
$333,495
$373,181
$393,024
$492,239
$591,454
$670,826
Kentucky
30-39.99
34.0
$122,202
$144,241
$188,319
$232,397
$276,475
$320,553
$386,670
$430,748
$452,787
$562,982
$673,177
$761,333
Kentucky
40-59.99
46.0
$182,256
$217,690
$288,558
$359,426
$430,294
$501,162
$607,464
$678,332
$713,766
$890,936
$1,068,106
$1,209,842
Kentucky
60-79.99
69.0
$237,020
$275,725
$353,135
$430,545
$507,955
$585,365
$701,480
$778,890
$817,595
$1,011,120
$1,204,645
$1,359,465
Kentucky
80-99.99
85.1
$310,433
$366,713
$479,273
$591,833
$704,393
$816,953
$985,793
$1,098,353
$1,154,633
$1,436,033
$1,717,433
$1,942,553
Kentucky
100 <
145.0
$490,670
$569,038
$725,774
$882,510
$1,039,246
$1,195,982
$1,431,086
$1,587,822
$1,666,190
$2,058,030
$2,449,870
$2,763,342
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$137,483
$155,913
$192,773
$229,633
$266,493
$303,353
$358,643
$395,503
$413,933
$506,083
$598,233
$671,953
Louisiana
15-19.99
17.0
$178,329
$198,017
$237,393
$276,769
$316,145
$355,521
$414,585
$453,961
$473,649
$572,089
$670,529
$749,281
Louisiana
20-29.99
23.0
$259,188
$292,438
$358,938
$425,438
$491,938
$558,438
$658,188
$724,688
$757,938
$924,188
$1,090,438
$1,223,438
Louisiana
30-39.99
34.0
$348,247
$383,462
$453,892
$524,322
$594,752
$665,182
$770,827
$841,257
$876,472
$1,052,547
$1,228,622
$1,369,482
1-181

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$480,047
$532,260
$636,686
$741,112
$845,538
$949,964
$1,106,603
$1,211,029
$1,263,242
$1,524,307
$1,785,372
$1,994,224
Louisiana
60-79.99
69.0
$698,664
$767,597
$905,463
$1,043,329
$1,181,195
$1,319,061
$1,525,860
$1,663,726
$1,732,659
$2,077,324
$2,421,989
$2,697,721
Louisiana
80-99.99
85.1
$863,783
$950,570
$1,124,144
$1,297,718
$1,471,292
$1,644,866
$1,905,227
$2,078,801
$2,165,588
$2,599,523
$3,033,458
$3,380,606
Louisiana
100 <
145.0
$1,454,450
$1,594,016
$1,873,148
$2,152,280
$2,431,412
$2,710,544
$3,129,242
$3,408,374
$3,547,940
$4,245,770
$4,943,600
$5,501,864
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$66,406
$83,956
$119,056
$154,156
$189,256
$224,356
$277,006
$312,106
$329,656
$417,406
$505,156
$575,356
Maine
15-19.99
17.0
$77,639
$96,082
$132,968
$169,854
$206,740
$243,626
$298,955
$335,841
$354,284
$446,499
$538,714
$612,486
Maine
20-29.99
23.0
$91,116
$110,629
$149,655
$188,681
$227,707
$266,733
$325,272
$364,298
$383,811
$481,376
$578,941
$656,993
Maine
30-39.99
34.0
$115,900
$137,451
$180,553
$223,655
$266,757
$309,859
$374,512
$417,614
$439,165
$546,920
$654,675
$740,879
Maine
40-59.99
46.0
$173,921
$208,887
$278,819
$348,751
$418,683
$488,615
$593,513
$663,445
$698,411
$873,241
$1,048,071
$1,187,935
Maine
60-79.99
69.0
$224,519
$262,522
$338,528
$414,534
$490,540
$566,546
$680,555
$756,561
$794,564
$984,579
$1,174,594
$1,326,606
Maine
80-99.99
85.1
$259,975
$300,141
$380,473
$460,805
$541,137
$621,469
$741,967
$822,299
$862,465
$1,063,295
$1,264,125
$1,424,789
Maine
100 <
145.0
$464,400
$541,292
$695,076
$848,860
$1,002,644
$1,156,428
$1,387,104
$1,540,888
$1,617,780
$2,002,240
$2,386,700
$2,694,268
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$71,245
$88,827
$123,991
$159,155
$194,319
$229,483
$282,229
$317,393
$334,975
$422,885
$510,795
$581,123
Maryland
15-19.99
17.0
$84,493
$102,981
$139,957
$176,933
$213,909
$250,885
$306,349
$343,325
$361,813
$454,253
$546,693
$620,645
Maryland
20-29.99
23.0
$100,389
$119,963
$159,111
$198,259
$237,407
$276,555
$335,277
$374,425
$393,999
$491,869
$589,739
$668,035
Maryland
30-39.99
34.0
$129,609
$151,250
$194,532
$237,814
$281,096
$324,378
$389,301
$432,583
$454,224
$562,429
$670,634
$757,198
Maryland
40-59.99
46.0
$192,434
$227,487
$297,593
$367,699
$437,805
$507,911
$613,070
$683,176
$718,229
$893,494
$1,068,759
$1,208,971
Maryland
60-79.99
69.0
$252,287
$290,420
$366,686
$442,952
$519,218
$595,484
$709,883
$786,149
$824,282
$1,014,947
$1,205,612
$1,358,144
Maryland
80-99.99
85.1
$329,165
$384,643
$495,599
$606,555
$717,511
$828,467
$994,901
$1,105,857
$1,161,335
$1,438,725
$1,716,115
$1,938,027
Maryland
100 <
145.0
$522,750
$599,914
$754,242
$908,570
$1,062,898
$1,217,226
$1,448,718
$1,603,046
$1,680,210
$2,066,030
$2,451,850
$2,760,506
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$68,283
$85,871
$121,047
$156,223
$191,399
$226,575
$279,339
$314,515
$332,103
$420,043
$507,983
$578,335
1-182

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$80,297
$98,793
$135,785
$172,777
$209,769
$246,761
$302,249
$339,241
$357,737
$450,217
$542,697
$616,681
Massachusetts
20-29.99
23.0
$94,713
$114,299
$153,471
$192,643
$231,815
$270,987
$329,745
$368,917
$388,503
$486,433
$584,363
$662,707
Massachusetts
30-39.99
34.0
$121,219
$142,878
$186,196
$229,514
$272,832
$316,150
$381,127
$424,445
$446,104
$554,399
$662,694
$749,330
Massachusetts
40-59.99
46.0
$181,075
$216,145
$286,285
$356,425
$426,565
$496,705
$601,915
$672,055
$707,125
$882,475
$1,057,825
$1,198,105
Massachusetts
60-79.99
69.0
$235,248
$273,406
$349,722
$426,038
$502,354
$578,670
$693,144
$769,460
$807,618
$998,408
$1,189,198
$1,341,830
Massachusetts
80-99.99
85.1
$308,155
$363,668
$474,694
$585,720
$696,746
$807,772
$974,311
$1,085,337
$1,140,850
$1,418,415
$1,695,980
$1,918,032
Massachusetts
100 <
145.0
$486,946
$564,164
$718,600
$873,036
$1,027,472
$1,181,908
$1,413,562
$1,567,998
$1,645,216
$2,031,306
$2,417,396
$2,726,268
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$32,550
$48,368
$80,004
$111,640
$143,276
$174,912
$222,366
$254,002
$269,820
$348,910
$428,000
$491,272
Michigan
15-19.99
17.0
$52,054
$69,668
$104,896
$140,124
$175,352
$210,580
$263,422
$298,650
$316,264
$404,334
$492,404
$562,860
Michigan
20-29.99
23.0
$56,503
$74,895
$111,679
$148,463
$185,247
$222,031
$277,207
$313,991
$332,383
$424,343
$516,303
$589,871
Michigan
30-39.99
34.0
$64,658
$84,477
$124,115
$163,753
$203,391
$243,029
$302,486
$342,124
$361,943
$461,038
$560,133
$639,409
Michigan
40-59.99
46.0
$73,629
$95,079
$137,979
$180,879
$223,779
$266,679
$331,029
$373,929
$395,379
$502,629
$609,879
$695,679
Michigan
60-79.99
69.0
$121,657
$157,274
$228,508
$299,742
$370,976
$442,210
$549,061
$620,295
$655,912
$833,997
$1,012,082
$1,154,550
Michigan
80-99.99
85.1
$132,986
$170,084
$244,280
$318,476
$392,672
$466,868
$578,162
$652,358
$689,456
$874,946
$1,060,436
$1,208,828
Michigan
100 <
145.0
$248,238
$320,116
$463,872
$607,628
$751,384
$895,140
$1,110,774
$1,254,530
$1,326,408
$1,685,798
$2,045,188
$2,332,700
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$61,746
$78,558
$112,182
$145,806
$179,430
$213,054
$263,490
$297,114
$313,926
$397,986
$482,046
$549,294
Minnesota
15-19.99
17.0
$71,142
$88,645
$123,651
$158,657
$193,663
$228,669
$281,178
$316,184
$333,687
$421,202
$508,717
$578,729
Minnesota
20-29.99
23.0
$82,326
$100,568
$137,052
$173,536
$210,020
$246,504
$301,230
$337,714
$355,956
$447,166
$538,376
$611,344
Minnesota
30-39.99
34.0
$102,831
$122,427
$161,619
$200,811
$240,003
$279,195
$337,983
$377,175
$396,771
$494,751
$592,731
$671,115
Minnesota
40-59.99
46.0
$125,276
$146,425
$188,723
$231,021
$273,319
$315,617
$379,064
$421,362
$442,511
$548,256
$654,001
$738,597
Minnesota
60-79.99
69.0
$199,133
$234,305
$304,649
$374,993
$445,337
$515,681
$621,197
$691,541
$726,713
$902,573
$1,078,433
$1,219,121
Minnesota
80-99.99
85.1
$228,694
$265,397
$338,803
$412,209
$485,615
$559,021
$669,130
$742,536
$779,239
$962,754
$1,146,269
$1,293,081
Minnesota
100 <
145.0
$411,312
$482,516
$624,924
$767,332
$909,740
$1,052,148
$1,265,760
$1,408,168
$1,479,372
$1,835,392
$2,191,412
$2,476,228
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-183

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$109,606
$127,712
$163,924
$200,136
$236,348
$272,560
$326,878
$363,090
$381,196
$471,726
$562,256
$634,680
Mississippi
15-19.99
17.0
$138,837
$158,067
$196,527
$234,987
$273,447
$311,907
$369,597
$408,057
$427,287
$523,437
$619,587
$696,507
Mississippi
20-29.99
23.0
$173,989
$194,642
$235,948
$277,254
$318,560
$359,866
$421,825
$463,131
$483,784
$587,049
$690,314
$772,926
Mississippi
30-39.99
34.0
$269,529
$304,093
$373,221
$442,349
$511,477
$580,605
$684,297
$753,425
$787,989
$960,809
$1,133,629
$1,271,885
Mississippi
40-59.99
46.0
$339,026
$375,629
$448,835
$522,041
$595,247
$668,453
$778,262
$851,468
$888,071
$1,071,086
$1,254,101
$1,400,513
Mississippi
60-79.99
69.0
$507,065
$562,621
$673,733
$784,845
$895,957
$1,007,069
$1,173,737
$1,284,849
$1,340,405
$1,618,185
$1,895,965
$2,118,189
Mississippi
80-99.99
85.1
$632,212
$702,617
$843,427
$984,237
$1,125,047
$1,265,857
$1,477,072
$1,617,882
$1,688,287
$2,040,312
$2,392,337
$2,673,957
Mississippi
100 <
145.0
$1,118,294
$1,254,636
$1,527,320
$1,800,004
$2,072,688
$2,345,372
$2,754,398
$3,027,082
$3,163,424
$3,845,134
$4,526,844
$5,072,212
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$80,597
$97,894
$132,488
$167,082
$201,676
$236,270
$288,161
$322,755
$340,052
$426,537
$513,022
$582,210
Missour

15-19.99
17.0
$97,740
$115,823
$151,989
$188,155
$224,321
$260,487
$314,736
$350,902
$368,985
$459,400
$549,815
$622,147
Missour

20-29.99
23.0
$118,313
$137,340
$175,394
$213,448
$251,502
$289,556
$346,637
$384,691
$403,718
$498,853
$593,988
$670,096
Missour

30-39.99
34.0
$188,001
$220,938
$286,812
$352,686
$418,560
$484,434
$583,245
$649,119
$682,056
$846,741
$1,011,426
$1,143,174
Missour

40-59.99
46.0
$228,598
$262,874
$331,426
$399,978
$468,530
$537,082
$639,910
$708,462
$742,738
$914,118
$1,085,498
$1,222,602
Missour

60-79.99
69.0
$340,986
$392,614
$495,870
$599,126
$702,382
$805,638
$960,522
$1,063,778
$1,115,406
$1,373,546
$1,631,686
$1,838,198
Missour

80-99.99
85.1
$395,873
$449,718
$557,408
$665,098
$772,788
$880,478
$1,042,013
$1,149,703
$1,203,548
$1,472,773
$1,741,998
$1,957,378
Missour

100 <
145.0
$705,760
$809,904
$1,018,192
$1,226,480
$1,434,768
$1,643,056
$1,955,488
$2,163,776
$2,267,920
$2,788,640
$3,309,360
$3,725,936
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$22,815
$35,070
$59,580
$84,090
$108,600
$133,110
$169,875
$194,385
$206,640
$267,915
$329,190
$378,210
Montana
15-19.99
17.0
$24,220
$37,393
$63,739
$90,085
$116,431
$142,777
$182,296
$208,642
$221,815
$287,680
$353,545
$406,237
Montana
20-29.99
23.0
$25,956
$40,281
$68,931
$97,581
$126,231
$154,881
$197,856
$226,506
$240,831
$312,456
$384,081
$441,381
Montana
30-39.99
34.0
$44,476
$61,600
$95,848
$130,096
$164,344
$198,592
$249,964
$284,212
$301,336
$386,956
$472,576
$541,072
Montana
40-59.99
46.0
$46,250
$63,980
$99,440
$134,900
$170,360
$205,820
$259,010
$294,470
$312,200
$400,850
$489,500
$560,420
Montana
60-79.99
69.0
$49,649
$68,539
$106,319
$144,099
$181,879
$219,659
$276,329
$314,109
$332,999
$427,449
$521,899
$597,459
Montana
80-99.99
85.1
$52,028
$71,730
$111,134
$150,538
$189,942
$229,346
$288,452
$327,856
$347,558
$446,068
$544,578
$623,386
1-184

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$100,332
$138,466
$214,734
$291,002
$367,270
$443,538
$557,940
$634,208
$672,342
$863,012
$1,053,682
$1,206,218
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$71,454
$88,243
$121,821
$155,399
$188,977
$222,555
$272,922
$306,500
$323,289
$407,234
$491,179
$558,335
Nebraska
15-19.99
17.0
$84,896
$102,367
$137,309
$172,251
$207,193
$242,135
$294,548
$329,490
$346,961
$434,316
$521,671
$591,555
Nebraska
20-29.99
23.0
$100,934
$119,132
$155,528
$191,924
$228,320
$264,716
$319,310
$355,706
$373,904
$464,894
$555,884
$628,676
Nebraska
30-39.99
34.0
$130,340
$149,872
$188,936
$228,000
$267,064
$306,128
$364,724
$403,788
$423,320
$520,980
$618,640
$696,768
Nebraska
40-59.99
46.0
$162,493
$183,555
$225,679
$267,803
$309,927
$352,051
$415,237
$457,361
$478,423
$583,733
$689,043
$773,291
Nebraska
60-79.99
69.0
$254,996
$290,075
$360,233
$430,391
$500,549
$570,707
$675,944
$746,102
$781,181
$956,576
$1,131,971
$1,272,287
Nebraska
80-99.99
85.1
$297,593
$334,182
$407,360
$480,538
$553,716
$626,894
$736,661
$809,839
$846,428
$1,029,373
$1,212,318
$1,358,674
Nebraska
100 <
145.0
$528,458
$599,218
$740,738
$882,258
$1,023,778
$1,165,298
$1,377,578
$1,519,098
$1,589,858
$1,943,658
$2,297,458
$2,580,498
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$20,107
$30,822
$52,252
$73,682
$95,112
$116,542
$148,687
$170,117
$180,832
$234,407
$287,982
$330,842
Nevada
15-19.99
17.0
$20,404
$31,416
$53,440
$75,464
$97,488
$119,512
$152,548
$174,572
$185,584
$240,644
$295,704
$339,752
Nevada
20-29.99
23.0
$20,812
$32,232
$55,072
$77,912
$100,752
$123,592
$157,852
$180,692
$192,112
$249,212
$306,312
$351,992
Nevada
30-39.99
34.0
$21,467
$33,542
$57,692
$81,842
$105,992
$130,142
$166,367
$190,517
$202,592
$262,967
$323,342
$371,642
Nevada
40-59.99
46.0
$40,128
$56,214
$88,386
$120,558
$152,730
$184,902
$233,160
$265,332
$281,418
$361,848
$442,278
$506,622
Nevada
60-79.99
69.0
$40,505
$56,968
$89,894
$122,820
$155,746
$188,672
$238,061
$270,987
$287,450
$369,765
$452,080
$517,932
Nevada
80-99.99
85.1
$40,768
$57,494
$90,946
$124,398
$157,850
$191,302
$241,480
$274,932
$291,658
$375,288
$458,918
$525,822
Nevada
100 <
145.0
$81,124
$114,164
$180,244
$246,324
$312,404
$378,484
$477,604
$543,684
$576,724
$741,924
$907,124
$1,039,284
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$60,965
$78,441
$113,393
$148,345
$183,297
$218,249
$270,677
$305,629
$323,105
$410,485
$497,865
$567,769
1-185

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$69,930
$88,268
$124,944
$161,620
$198,296
$234,972
$289,986
$326,662
$345,000
$436,690
$528,380
$601,732
New
Hampshire
20-29.99
23.0
$80,688
$100,060
$138,804
$177,548
$216,292
$255,036
$313,152
$351,896
$371,268
$468,128
$564,988
$642,476
New
Hampshire
30-39.99
34.0
$100,485
$121,827
$164,511
$207,195
$249,879
$292,563
$356,589
$399,273
$420,615
$527,325
$634,035
$719,403
New
Hampshire
40-59.99
46.0
$122,074
$145,558
$192,526
$239,494
$286,462
$333,430
$403,882
$450,850
$474,334
$591,754
$709,174
$803,110
New
Hampshire
60-79.99
69.0
$193,358
$231,060
$306,464
$381,868
$457,272
$532,676
$645,782
$721,186
$758,888
$947,398
$1,135,908
$1,286,716
New
Hampshire
80-99.99
85.1
$221,418
$261,088
$340,428
$419,768
$499,108
$578,448
$697,458
$776,798
$816,468
$1,014,818
$1,213,168
$1,371,848
New
Hampshire
100 <
145.0
$398,914
$475,172
$627,688
$780,204
$932,720
$1,085,236
$1,314,010
$1,466,526
$1,542,784
$1,924,074
$2,305,364
$2,610,396
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$89,900
$107,724
$143,372
$179,020
$214,668
$250,316
$303,788
$339,436
$357,260
$446,380
$535,500
$606,796
New Jersey
15-19.99
17.0
$110,922
$129,753
$167,415
$205,077
$242,739
$280,401
$336,894
$374,556
$393,387
$487,542
$581,697
$657,021
New Jersey
20-29.99
23.0
$136,221
$156,334
$196,560
$236,786
$277,012
$317,238
$377,577
$417,803
$437,916
$538,481
$639,046
$719,498
New Jersey
30-39.99
34.0
$182,466
$204,793
$249,447
$294,101
$338,755
$383,409
$450,390
$495,044
$517,371
$629,006
$740,641
$829,949
New Jersey
40-59.99
46.0
$263,801
$299,637
$371,309
$442,981
$514,653
$586,325
$693,833
$765,505
$801,341
$980,521
$1,159,701
$1,303,045
New Jersey
60-79.99
69.0
$359,152
$398,273
$476,515
$554,757
$632,999
$711,241
$828,604
$906,846
$945,967
$1,141,572
$1,337,177
$1,493,661
New Jersey
80-99.99
85.1
$461,131
$517,993
$631,717
$745,441
$859,165
$972,889
$1,143,475
$1,257,199
$1,314,061
$1,598,371
$1,882,681
$2,110,129
New Jersey
100 <
145.0
$747,322
$826,562
$985,042
$1,143,522
$1,302,002
$1,460,482
$1,698,202
$1,856,682
$1,935,922
$2,332,122
$2,728,322
$3,045,282
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$22,335
$35,278
$61,164
$87,050
$112,936
$138,822
$177,651
$203,537
$216,480
$281,195
$345,910
$397,682
New Mexico
15-19.99
17.0
$23,590
$37,788
$66,184
$94,580
$122,976
$151,372
$193,966
$222,362
$236,560
$307,550
$378,540
$435,332
New Mexico
20-29.99
23.0
$40,974
$57,906
$91,770
$125,634
$159,498
$193,362
$244,158
$278,022
$294,954
$379,614
$464,274
$532,002
New Mexico
30-39.99
34.0
$41,702
$59,362
$94,682
$130,002
$165,322
$200,642
$253,622
$288,942
$306,602
$394,902
$483,202
$553,842
New Mexico
40-59.99
46.0
$42,496
$60,950
$97,858
$134,766
$171,674
$208,582
$263,944
$300,852
$319,306
$411,576
$503,846
$577,662
New Mexico
60-79.99
69.0
$44,094
$64,146
$104,250
$144,354
$184,458
$224,562
$284,718
$324,822
$344,874
$445,134
$545,394
$625,602
1-186

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$45,160
$66,278
$108,514
$150,750
$192,986
$235,222
$298,576
$340,812
$361,930
$467,520
$573,110
$657,582
New Mexico
100 <
145.0
$88,650
$129,216
$210,348
$291,480
$372,612
$453,744
$575,442
$656,574
$697,140
$899,970
$1,102,800
$1,265,064
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$66,415
$83,721
$118,333
$152,945
$187,557
$222,169
$274,087
$308,699
$326,005
$412,535
$499,065
$568,289
New York
15-19.99
17.0
$77,649
$95,745
$131,937
$168,129
$204,321
$240,513
$294,801
$330,993
$349,089
$439,569
$530,049
$602,433
New York
20-29.99
23.0
$91,132
$110,177
$148,267
$186,357
$224,447
$262,537
$319,672
$357,762
$376,807
$472,032
$567,257
$643,437
New York
30-39.99
34.0
$115,924
$136,783
$178,501
$220,219
$261,937
$303,655
$366,232
$407,950
$428,809
$533,104
$637,399
$720,835
New York
40-59.99
46.0
$174,226
$208,528
$277,132
$345,736
$414,340
$482,944
$585,850
$654,454
$688,756
$860,266
$1,031,776
$1,168,984
New York
60-79.99
69.0
$224,974
$261,980
$335,992
$410,004
$484,016
$558,028
$669,046
$743,058
$780,064
$965,094
$1,150,124
$1,298,148
New York
80-99.99
85.1
$260,412
$299,224
$376,848
$454,472
$532,096
$609,720
$726,156
$803,780
$842,592
$1,036,652
$1,230,712
$1,385,960
New York
100 <
145.0
$465,354
$540,150
$689,742
$839,334
$988,926
$1,138,518
$1,362,906
$1,512,498
$1,587,294
$1,961,274
$2,335,254
$2,634,438
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$89,689
$107,318
$142,576
$177,834
$213,092
$248,350
$301,237
$336,495
$354,124
$442,269
$530,414
$600,930
North Carolina
15-19.99
17.0
$110,622
$129,176
$166,284
$203,392
$240,500
$277,608
$333,270
$370,378
$388,932
$481,702
$574,472
$648,688
North Carolina
20-29.99
23.0
$135,740
$155,403
$194,729
$234,055
$273,381
$312,707
$371,696
$411,022
$430,685
$529,000
$627,315
$705,967
North Carolina
30-39.99
34.0
$181,867
$203,640
$247,186
$290,732
$334,278
$377,824
$443,143
$486,689
$508,462
$617,327
$726,192
$813,284
North Carolina
40-59.99
46.0
$263,084
$298,263
$368,621
$438,979
$509,337
$579,695
$685,232
$755,590
$790,769
$966,664
$1,142,559
$1,283,275
North Carolina
60-79.99
69.0
$358,262
$396,584
$473,228
$549,872
$626,516
$703,160
$818,126
$894,770
$933,092
$1,124,702
$1,316,312
$1,469,600
North Carolina
80-99.99
85.1
$459,901
$515,645
$627,133
$738,621
$850,109
$961,597
$1,128,829
$1,240,317
$1,296,061
$1,574,781
$1,853,501
$2,076,477
North Carolina
100 <
145.0
$745,456
$823,020
$978,148
$1,133,276
$1,288,404
$1,443,532
$1,676,224
$1,831,352
$1,908,916
$2,296,736
$2,684,556
$2,994,812
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$22,453
$35,514
$61,636
$87,758
$113,880
$140,002
$179,185
$205,307
$218,368
$283,673
$348,978
$401,222
North Dakota
15-19.99
17.0
$23,757
$38,122
$66,852
$95,582
$124,312
$153,042
$196,137
$224,867
$239,232
$311,057
$382,882
$440,342
North Dakota
20-29.99
23.0
$41,036
$58,030
$92,018
$126,006
$159,994
$193,982
$244,964
$278,952
$295,946
$380,916
$465,886
$533,862
1-187

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$41,793
$59,544
$95,046
$130,548
$166,050
$201,552
$254,805
$290,307
$308,058
$396,813
$485,568
$556,572
North Dakota
40-59.99
46.0
$42,620
$61,198
$98,354
$135,510
$172,666
$209,822
$265,556
$302,712
$321,290
$414,180
$507,070
$581,382
North Dakota
60-79.99
69.0
$44,280
$64,518
$104,994
$145,470
$185,946
$226,422
$287,136
$327,612
$347,850
$449,040
$550,230
$631,182
North Dakota
80-99.99
85.1
$45,389
$66,736
$109,430
$152,124
$194,818
$237,512
$301,553
$344,247
$365,594
$472,329
$579,064
$664,452
North Dakota
100 <
145.0
$89,042
$130,000
$211,916
$293,832
$375,748
$457,664
$580,538
$662,454
$703,412
$908,202
$1,112,992
$1,276,824
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$76,602
$93,953
$128,655
$163,357
$198,059
$232,761
$284,814
$319,516
$336,867
$423,622
$510,377
$579,781
Ohio
15-19.99
17.0
$92,081
$110,241
$146,561
$182,881
$219,201
$255,521
$310,001
$346,321
$364,481
$455,281
$546,081
$618,721
Ohio
20-29.99
23.0
$110,657
$129,788
$168,050
$206,312
$244,574
$282,836
$340,229
$378,491
$397,622
$493,277
$588,932
$665,456
Ohio
30-39.99
34.0
$144,787
$165,774
$207,748
$249,722
$291,696
$333,670
$396,631
$438,605
$459,592
$564,527
$669,462
$753,410
Ohio
40-59.99
46.0
$182,013
$205,017
$251,025
$297,033
$343,041
$389,049
$458,061
$504,069
$527,073
$642,093
$757,113
$849,129
Ohio
60-79.99
69.0
$283,475
$320,665
$395,045
$469,425
$543,805
$618,185
$729,755
$804,135
$841,325
$1,027,275
$1,213,225
$1,361,985
Ohio
80-99.99
85.1
$332,562
$371,601
$449,679
$527,757
$605,835
$683,913
$801,030
$879,108
$918,147
$1,113,342
$1,308,537
$1,464,693
Ohio
100 <
145.0
$588,292
$663,476
$813,844
$964,212
$1,114,580
$1,264,948
$1,490,500
$1,640,868
$1,716,052
$2,091,972
$2,467,892
$2,768,628
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$85,209
$102,304
$136,494
$170,684
$204,874
$239,064
$290,349
$324,539
$341,634
$427,109
$512,584
$580,964
Oklahoma
15-19.99
17.0
$104,276
$122,074
$157,670
$193,266
$228,862
$264,458
$317,852
$353,448
$371,246
$460,236
$549,226
$620,418
Oklahoma
20-29.99
23.0
$127,155
$145,796
$183,078
$220,360
$257,642
$294,924
$350,847
$388,129
$406,770
$499,975
$593,180
$667,744
Oklahoma
30-39.99
34.0
$201,238
$233,771
$298,837
$363,903
$428,969
$494,035
$591,634
$656,700
$689,233
$851,898
$1,014,563
$1,144,695
Oklahoma
40-59.99
46.0
$246,506
$280,235
$347,693
$415,151
$482,609
$550,067
$651,254
$718,712
$752,441
$921,086
$1,089,731
$1,224,647
Oklahoma
60-79.99
69.0
$367,737
$418,433
$519,825
$621,217
$722,609
$824,001
$976,089
$1,077,481
$1,128,177
$1,381,657
$1,635,137
$1,837,921
Oklahoma
80-99.99
85.1
$428,691
$481,211
$586,251
$691,291
$796,331
$901,371
$1,058,931
$1,163,971
$1,216,491
$1,479,091
$1,741,691
$1,951,771
Oklahoma
100 <
145.0
$761,974
$864,158
$1,068,526
$1,272,894
$1,477,262
$1,681,630
$1,988,182
$2,192,550
$2,294,734
$2,805,654
$3,316,574
$3,725,310
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-188

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$56,500
$74,002
$109,006
$144,010
$179,014
$214,018
$266,524
$301,528
$319,030
$406,540
$494,050
$564,058
Oregon
15-19.99
17.0
$63,604
$81,978
$118,726
$155,474
$192,222
$228,970
$284,092
$320,840
$339,214
$431,084
$522,954
$596,450
Oregon
20-29.99
23.0
$72,129
$91,549
$130,389
$169,229
$208,069
$246,909
$305,169
$344,009
$363,429
$460,529
$557,629
$635,309
Oregon
30-39.99
34.0
$87,833
$109,247
$152,075
$194,903
$237,731
$280,559
$344,801
$387,629
$409,043
$516,113
$623,183
$708,839
Oregon
40-59.99
46.0
$104,956
$128,537
$175,699
$222,861
$270,023
$317,185
$387,928
$435,090
$458,671
$576,576
$694,481
$788,805
Oregon
60-79.99
69.0
$167,639
$205,444
$281,054
$356,664
$432,274
$507,884
$621,299
$696,909
$734,714
$923,739
$1,112,764
$1,263,984
Oregon
80-99.99
85.1
$189,822
$229,744
$309,588
$389,432
$469,276
$549,120
$668,886
$748,730
$788,652
$988,262
$1,187,872
$1,347,560
Oregon
100 <
145.0
$344,868
$421,344
$574,296
$727,248
$880,200
$1,033,152
$1,262,580
$1,415,532
$1,492,008
$1,874,388
$2,256,768
$2,562,672
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$63,326
$80,874
$115,970
$151,066
$186,162
$221,258
$273,902
$308,998
$326,546
$414,286
$502,026
$572,218
Pennsylvania
15-19.99
17.0
$73,274
$91,713
$128,591
$165,469
$202,347
$239,225
$294,542
$331,420
$349,859
$442,054
$534,249
$608,005
Pennsylvania
20-29.99
23.0
$85,211
$104,719
$143,735
$182,751
$221,767
$260,783
$319,307
$358,323
$377,831
$475,371
$572,911
$650,943
Pennsylvania
30-39.99
34.0
$107,172
$128,716
$171,804
$214,892
$257,980
$301,068
$365,700
$408,788
$430,332
$538,052
$645,772
$731,948
Pennsylvania
40-59.99
46.0
$162,115
$197,074
$266,992
$336,910
$406,828
$476,746
$581,623
$651,541
$686,500
$861,295
$1,036,090
$1,175,926
Pennsylvania
60-79.99
69.0
$206,810
$244,803
$320,789
$396,775
$472,761
$548,747
$662,726
$738,712
$776,705
$966,670
$1,156,635
$1,308,607
Pennsylvania
80-99.99
85.1
$273,053
$328,334
$438,896
$549,458
$660,020
$770,582
$936,425
$1,046,987
$1,102,268
$1,378,673
$1,655,078
$1,876,202
Pennsylvania
100 <
145.0
$427,184
$504,054
$657,794
$811,534
$965,274
$1,119,014
$1,349,624
$1,503,364
$1,580,234
$1,964,584
$2,348,934
$2,656,414
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$84,678
$102,386
$137,802
$173,218
$208,634
$244,050
$297,174
$332,590
$350,298
$438,838
$527,378
$598,210
Rhode Island
15-19.99
17.0
$103,523
$122,190
$159,524
$196,858
$234,192
$271,526
$327,527
$364,861
$383,528
$476,863
$570,198
$644,866
Rhode Island
20-29.99
23.0
$126,136
$145,952
$185,584
$225,216
$264,848
$304,480
$363,928
$403,560
$423,376
$522,456
$621,536
$700,800
Rhode Island
30-39.99
34.0
$167,670
$189,669
$233,667
$277,665
$321,663
$365,661
$431,658
$475,656
$497,655
$607,650
$717,645
$805,641
Rhode Island
40-59.99
46.0
$243,786
$279,182
$349,974
$420,766
$491,558
$562,350
$668,538
$739,330
$774,726
$951,706
$1,128,686
$1,270,270
Rhode Island
60-79.99
69.0
$329,317
$367,965
$445,261
$522,557
$599,853
$677,149
$793,093
$870,389
$909,037
$1,102,277
$1,295,517
$1,450,109
Rhode Island
80-99.99
85.1
$424,255
$480,455
$592,855
$705,255
$817,655
$930,055
$1,098,655
$1,211,055
$1,267,255
$1,548,255
$1,829,255
$2,054,055
Rhode Island
100 <
145.0
$684,626
$762,874
$919,370
$1,075,866
$1,232,362
$1,388,858
$1,623,602
$1,780,098
$1,858,346
$2,249,586
$2,640,826
$2,953,818
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-189

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$82,481
$100,226
$135,716
$171,206
$206,696
$242,186
$295,421
$330,911
$348,656
$437,381
$526,106
$597,086
South Carolina
15-19.99
17.0
$100,410
$119,128
$156,564
$194,000
$231,436
$268,872
$325,026
$362,462
$381,180
$474,770
$568,360
$643,232
South Carolina
20-29.99
23.0
$122,000
$141,961
$181,883
$221,805
$261,727
$301,649
$361,532
$401,454
$421,415
$521,220
$621,025
$700,869
South Carolina
30-39.99
34.0
$192,972
$226,810
$294,486
$362,162
$429,838
$497,514
$599,028
$666,704
$700,542
$869,732
$1,038,922
$1,174,274
South Carolina
40-59.99
46.0
$235,449
$271,070
$342,312
$413,554
$484,796
$556,038
$662,901
$734,143
$769,764
$947,869
$1,125,974
$1,268,458
South Carolina
60-79.99
69.0
$351,499
$405,381
$513,145
$620,909
$728,673
$836,437
$998,083
$1,105,847
$1,159,729
$1,429,139
$1,698,549
$1,914,077
South Carolina
80-99.99
85.1
$408,624
$465,033
$577,851
$690,669
$803,487
$916,305
$1,085,532
$1,198,350
$1,254,759
$1,536,804
$1,818,849
$2,044,485
South Carolina
100 <
145.0
$727,834
$836,696
$1,054,420
$1,272,144
$1,489,868
$1,707,592
$2,034,178
$2,251,902
$2,360,764
$2,905,074
$3,449,384
$3,884,832
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$31,491
$44,553
$70,677
$96,801
$122,925
$149,049
$188,235
$214,359
$227,421
$292,731
$358,041
$410,289
South Dakota
15-19.99
17.0
$53,350
$69,856
$102,868
$135,880
$168,892
$201,904
$251,422
$284,434
$300,940
$383,470
$466,000
$532,024
South Dakota
20-29.99
23.0
$58,357
$75,351
$109,339
$143,327
$177,315
$211,303
$262,285
$296,273
$313,267
$398,237
$483,207
$551,183
South Dakota
30-39.99
34.0
$67,400
$85,153
$120,659
$156,165
$191,671
$227,177
$280,436
$315,942
$333,695
$422,460
$511,225
$582,237
South Dakota
40-59.99
46.0
$77,264
$95,844
$133,004
$170,164
$207,324
$244,484
$300,224
$337,384
$355,964
$448,864
$541,764
$616,084
South Dakota
60-79.99
69.0
$128,314
$160,831
$225,865
$290,899
$355,933
$420,967
$518,518
$583,552
$616,069
$778,654
$941,239
$1,071,307
South Dakota
80-99.99
85.1
$141,226
$174,531
$241,141
$307,751
$374,361
$440,971
$540,886
$607,496
$640,801
$807,326
$973,851
$1,107,071
South Dakota
100 <
145.0
$262,244
$327,622
$458,378
$589,134
$719,890
$850,646
$1,046,780
$1,177,536
$1,242,914
$1,569,804
$1,896,694
$2,158,206
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$77,298
$95,077
$130,635
$166,193
$201,751
$237,309
$290,646
$326,204
$343,983
$432,878
$521,773
$592,889
Tennessee
15-19.99
17.0
$93,067
$111,833
$149,365
$186,897
$224,429
$261,961
$318,259
$355,791
$374,557
$468,387
$562,217
$637,281
Tennessee
20-29.99
23.0
$112,066
$132,092
$172,144
$212,196
$252,248
$292,300
$352,378
$392,430
$412,456
$512,586
$612,716
$692,820
Tennessee
30-39.99
34.0
$146,759
$168,957
$213,353
$257,749
$302,145
$346,541
$413,135
$457,531
$479,729
$590,719
$701,709
$790,501
Tennessee
40-59.99
46.0
$215,542
$251,254
$322,678
$394,102
$465,526
$536,950
$644,086
$715,510
$751,222
$929,782
$1,108,342
$1,251,190
Tennessee
60-79.99
69.0
$286,763
$325,698
$403,568
$481,438
$559,308
$637,178
$753,983
$831,853
$870,788
$1,065,463
$1,260,138
$1,415,878
1-190

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$371,820
$428,422
$541,626
$654,830
$768,034
$881,238
$1,051,044
$1,164,248
$1,220,850
$1,503,860
$1,786,870
$2,013,278
Tennessee
100 <
145.0
$665,126
$774,318
$992,702
$1,211,086
$1,429,470
$1,647,854
$1,975,430
$2,193,814
$2,303,006
$2,848,966
$3,394,926
$3,831,694
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$94,815
$111,895
$146,055
$180,215
$214,375
$248,535
$299,775
$333,935
$351,015
$436,415
$521,815
$590,135
Texas
15-19.99
17.0
$117,884
$135,661
$171,215
$206,769
$242,323
$277,877
$331,208
$366,762
$384,539
$473,424
$562,309
$633,417
Texas
20-29.99
23.0
$145,567
$164,180
$201,406
$238,632
$275,858
$313,084
$368,923
$406,149
$424,762
$517,827
$610,892
$685,344
Texas
30-39.99
34.0
$228,468
$260,971
$325,977
$390,983
$455,989
$520,995
$618,504
$683,510
$716,013
$878,528
$1,041,043
$1,171,055
Texas
40-59.99
46.0
$283,346
$317,034
$384,410
$451,786
$519,162
$586,538
$687,602
$754,978
$788,666
$957,106
$1,125,546
$1,260,298
Texas
60-79.99
69.0
$422,988
$473,614
$574,866
$676,118
$777,370
$878,622
$1,030,500
$1,131,752
$1,182,378
$1,435,508
$1,688,638
$1,891,142
Texas
80-99.99
85.1
$529,212
$594,232
$724,272
$854,312
$984,352
$1,114,392
$1,309,452
$1,439,492
$1,504,512
$1,829,612
$2,154,712
$2,414,792
Texas
100 <
145.0
$878,084
$980,122
$1,184,198
$1,388,274
$1,592,350
$1,796,426
$2,102,540
$2,306,616
$2,408,654
$2,918,844
$3,429,034
$3,837,186
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$22,167
$34,942
$60,492
$86,042
$111,592
$137,142
$175,467
$201,017
$213,792
$277,667
$341,542
$392,642
Utah
15-19.99
17.0
$23,352
$37,312
$65,232
$93,152
$121,072
$148,992
$190,872
$218,792
$232,752
$302,552
$372,352
$428,192
Utah
20-29.99
23.0
$24,714
$40,036
$70,680
$101,324
$131,968
$162,612
$208,578
$239,222
$254,544
$331,154
$407,764
$469,052
Utah
30-39.99
34.0
$41,571
$59,100
$94,158
$129,216
$164,274
$199,332
$251,919
$286,977
$304,506
$392,151
$479,796
$549,912
Utah
40-59.99
46.0
$42,319
$60,596
$97,150
$133,704
$170,258
$206,812
$261,643
$298,197
$316,474
$407,859
$499,244
$572,352
Utah
60-79.99
69.0
$43,753
$63,464
$102,886
$142,308
$181,730
$221,152
$280,285
$319,707
$339,418
$437,973
$536,528
$615,372
Utah
80-99.99
85.1
$44,832
$65,622
$107,202
$148,782
$190,362
$231,942
$294,312
$335,892
$356,682
$460,632
$564,582
$647,742
Utah
100 <
145.0
$88,092
$128,100
$208,116
$288,132
$368,148
$448,164
$568,188
$648,204
$688,212
$888,252
$1,088,292
$1,248,324
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$69,178
$86,335
$120,649
$154,963
$189,277
$223,591
$275,062
$309,376
$326,533
$412,318
$498,103
$566,731
Vermont
15-19.99
17.0
$81,564
$99,449
$135,219
$170,989
$206,759
$242,529
$296,184
$331,954
$349,839
$439,264
$528,689
$600,229
Vermont
20-29.99
23.0
$96,428
$115,187
$152,705
$190,223
$227,741
$265,259
$321,536
$359,054
$377,813
$471,608
$565,403
$640,439
1-191

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$123,752
$144,188
$185,060
$225,932
$266,804
$307,676
$368,984
$409,856
$430,292
$532,472
$634,652
$716,396
Vermont
40-59.99
46.0
$153,479
$175,662
$220,028
$264,394
$308,760
$353,126
$419,675
$464,041
$486,224
$597,139
$708,054
$796,786
Vermont
60-79.99
69.0
$241,111
$277,508
$350,302
$423,096
$495,890
$568,684
$677,875
$750,669
$787,066
$969,051
$1,151,036
$1,296,624
Vermont
80-99.99
85.1
$280,313
$318,373
$394,493
$470,613
$546,733
$622,853
$737,033
$813,153
$851,213
$1,041,513
$1,231,813
$1,384,053
Vermont
100 <
145.0
$499,266
$572,782
$719,814
$866,846
$1,013,878
$1,160,910
$1,381,458
$1,528,490
$1,602,006
$1,969,586
$2,337,166
$2,631,230
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$69,473
$86,956
$121,922
$156,888
$191,854
$226,820
$279,269
$314,235
$331,718
$419,133
$506,548
$576,480
Virginia
15-19.99
17.0
$81,981
$100,328
$137,022
$173,716
$210,410
$247,104
$302,145
$338,839
$357,186
$448,921
$540,656
$614,044
Virginia
20-29.99
23.0
$96,992
$116,376
$155,144
$193,912
$232,680
$271,448
$329,600
$368,368
$387,752
$484,672
$581,592
$659,128
Virginia
30-39.99
34.0
$124,587
$145,947
$188,667
$231,387
$274,107
$316,827
$380,907
$423,627
$444,987
$551,787
$658,587
$744,027
Virginia
40-59.99
46.0
$185,750
$220,533
$290,099
$359,665
$429,231
$498,797
$603,146
$672,712
$707,495
$881,410
$1,055,325
$1,194,457
Virginia
60-79.99
69.0
$242,261
$279,989
$355,445
$430,901
$506,357
$581,813
$694,997
$770,453
$808,181
$996,821
$1,185,461
$1,336,373
Virginia
80-99.99
85.1
$316,731
$371,641
$481,461
$591,281
$701,101
$810,921
$975,651
$1,085,471
$1,140,381
$1,414,931
$1,689,481
$1,909,121
Virginia
100 <
145.0
$501,682
$577,996
$730,624
$883,252
$1,035,880
$1,188,508
$1,417,450
$1,570,078
$1,646,392
$2,027,962
$2,409,532
$2,714,788
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$50,316
$67,065
$100,563
$134,061
$167,559
$201,057
$251,304
$284,802
$301,551
$385,296
$469,041
$536,037
Washington
15-19.99
17.0
$76,266
$94,242
$130,194
$166,146
$202,098
$238,050
$291,978
$327,930
$345,906
$435,786
$525,666
$597,570
Washington
20-29.99
23.0
$89,259
$108,141
$145,905
$183,669
$221,433
$259,197
$315,843
$353,607
$372,489
$466,899
$561,309
$636,837
Washington
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Washington
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Washington
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Washington
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Washington
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-192

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$58,061
$75,671
$110,891
$146,111
$181,331
$216,551
$269,381
$304,601
$322,211
$410,261
$498,311
$568,751
West Virginia
15-19.99
17.0
$65,815
$84,342
$121,396
$158,450
$195,504
$232,558
$288,139
$325,193
$343,720
$436,355
$528,990
$603,098
West Virginia
20-29.99
23.0
$75,119
$94,746
$134,000
$173,254
$212,508
$251,762
$310,643
$349,897
$369,524
$467,659
$565,794
$644,302
West Virginia
30-39.99
34.0
$92,253
$113,973
$157,413
$200,853
$244,293
$287,733
$352,893
$396,333
$418,053
$526,653
$635,253
$722,133
West Virginia
40-59.99
46.0
$110,938
$134,934
$182,926
$230,918
$278,910
$326,902
$398,890
$446,882
$470,878
$590,858
$710,838
$806,822
West Virginia
60-79.99
69.0
$176,430
$214,676
$291,168
$367,660
$444,152
$520,644
$635,382
$711,874
$750,120
$941,350
$1,132,580
$1,285,564
West Virginia
80-99.99
85.1
$200,665
$241,131
$322,063
$402,995
$483,927
$564,859
$686,257
$767,189
$807,655
$1,009,985
$1,212,315
$1,374,179
West Virginia
100 <
145.0
$363,342
$440,744
$595,548
$750,352
$905,156
$1,059,960
$1,292,166
$1,446,970
$1,524,372
$1,911,382
$2,298,392
$2,608,000
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$73,301
$90,327
$124,379
$158,431
$192,483
$226,535
$277,613
$311,665
$328,691
$413,821
$498,951
$567,055
Wisconsin
15-19.99
17.0
$87,406
$105,106
$140,506
$175,906
$211,306
$246,706
$299,806
$335,206
$352,906
$441,406
$529,906
$600,706
Wisconsin
20-29.99
23.0
$104,331
$122,840
$159,858
$196,876
$233,894
$270,912
$326,439
$363,457
$381,966
$474,511
$567,056
$641,092
Wisconsin
30-39.99
34.0
$135,437
$155,504
$195,638
$235,772
$275,906
$316,040
$376,241
$416,375
$436,442
$536,777
$637,112
$717,380
Wisconsin
40-59.99
46.0
$169,287
$190,971
$234,339
$277,707
$321,075
$364,443
$429,495
$472,863
$494,547
$602,967
$711,387
$798,123
Wisconsin
60-79.99
69.0
$265,041
$300,907
$372,639
$444,371
$516,103
$587,835
$695,433
$767,165
$803,031
$982,361
$1,161,691
$1,305,155
Wisconsin
80-99.99
85.1
$309,827
$347,232
$422,042
$496,852
$571,662
$646,472
$758,687
$833,497
$870,902
$1,057,927
$1,244,952
$1,394,572
Wisconsin
100 <
145.0
$549,554
$621,954
$766,754
$911,554
$1,056,354
$1,201,154
$1,418,354
$1,563,154
$1,635,554
$1,997,554
$2,359,554
$2,649,154
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$29,856
$42,664
$68,280
$93,896
$119,512
$145,128
$183,552
$209,168
$221,976
$286,016
$350,056
$401,288
Wyoming
15-19.99
17.0
$34,245
$48,252
$76,266
$104,280
$132,294
$160,308
$202,329
$230,343
$244,350
$314,385
$384,420
$440,448
Wyoming
20-29.99
23.0
$55,502
$72,288
$105,860
$139,432
$173,004
$206,576
$256,934
$290,506
$307,292
$391,222
$475,152
$542,296
Wyoming
30-39.99
34.0
$63,288
$80,843
$115,953
$151,063
$186,173
$221,283
$273,948
$309,058
$326,613
$414,388
$502,163
$572,383
Wyoming
40-59.99
46.0
$71,701
$90,013
$126,637
$163,261
$199,885
$236,509
$291,445
$328,069
$346,381
$437,941
$529,501
$602,749
Wyoming
60-79.99
69.0
$87,827
$107,591
$147,119
$186,647
$226,175
$265,703
$324,995
$364,523
$384,287
$483,107
$581,927
$660,983
Wyoming
80-99.99
85.1
$99,189
$120,044
$161,754
$203,464
$245,174
$286,884
$349,449
$391,159
$412,014
$516,289
$620,564
$703,984
Wyoming
100 <
145.0
$180,710
$220,828
$301,064
$381,300
$461,536
$541,772
$662,126
$742,362
$782,480
$983,070
$1,183,660
$1,344,132
1-193

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$120,881
$138,810
$174,668
$210,526
$246,384
$282,242
$336,029
$371,887
$389,816
$479,461
$569,106
$640,822
Alabama
15-19.99
17.0
$154,810
$173,789
$211,747
$249,705
$287,663
$325,621
$382,558
$420,516
$439,495
$534,390
$629,285
$705,201
Alabama
20-29.99
23.0
$195,601
$215,916
$256,546
$297,176
$337,806
$378,436
$439,381
$480,011
$500,326
$601,901
$703,476
$784,736
Alabama
30-39.99
34.0
$301,621
$335,830
$404,248
$472,666
$541,084
$609,502
$712,129
$780,547
$814,756
$985,801
$1,156,846
$1,293,682
Alabama
40-59.99
46.0
$382,444
$418,566
$490,810
$563,054
$635,298
$707,542
$815,908
$888,152
$924,274
$1,104,884
$1,285,494
$1,429,982
Alabama
60-79.99
69.0
$572,096
$626,833
$736,307
$845,781
$955,255
$1,064,729
$1,228,940
$1,338,414
$1,393,151
$1,666,836
$1,940,521
$2,159,469
Alabama
80-99.99
85.1
$712,538
$782,054
$921,086
$1,060,118
$1,199,150
$1,338,182
$1,546,730
$1,685,762
$1,755,278
$2,102,858
$2,450,438
$2,728,502
Alabama
100 <
145.0
$1,191,406
$1,302,064
$1,523,380
$1,744,696
$1,966,012
$2,187,328
$2,519,302
$2,740,618
$2,851,276
$3,404,566
$3,957,856
$4,400,488
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$50,316
$67,065
$100,563
$134,061
$167,559
$201,057
$251,304
$284,802
$301,551
$385,296
$469,041
$536,037
Alaska
15-19.99
17.0
$76,266
$94,242
$130,194
$166,146
$202,098
$238,050
$291,978
$327,930
$345,906
$435,786
$525,666
$597,570
Alaska
20-29.99
23.0
$89,259
$108,141
$145,905
$183,669
$221,433
$259,197
$315,843
$353,607
$372,489
$466,899
$561,309
$636,837
Alaska
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Alaska
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Alaska
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Alaska
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Alaska
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$20,890
$32,388
$55,384
$78,380
$101,376
$124,372
$158,866
$181,862
$193,360
$250,850
$308,340
$354,332
Arizona
15-19.99
17.0
$21,494
$33,596
$57,800
$82,004
$106,208
$130,412
$166,718
$190,922
$203,024
$263,534
$324,044
$372,452
Arizona
20-29.99
23.0
$22,218
$35,044
$60,696
$86,348
$112,000
$137,652
$176,130
$201,782
$214,608
$278,738
$342,868
$394,172
Arizona
30-39.99
34.0
$40,503
$56,964
$89,886
$122,808
$155,730
$188,652
$238,035
$270,957
$287,418
$369,723
$452,028
$517,872
1-194

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$40,976
$57,910
$91,778
$125,646
$159,514
$193,382
$244,184
$278,052
$294,986
$379,656
$464,326
$532,062
Arizona
60-79.99
69.0
$41,738
$59,434
$94,826
$130,218
$165,610
$201,002
$254,090
$289,482
$307,178
$395,658
$484,138
$554,922
Arizona
80-99.99
85.1
$42,272
$60,502
$96,962
$133,422
$169,882
$206,342
$261,032
$297,492
$315,722
$406,872
$498,022
$570,942
Arizona
100 <
145.0
$83,708
$119,332
$190,580
$261,828
$333,076
$404,324
$511,196
$582,444
$618,068
$796,188
$974,308
$1,116,804
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$101,716
$119,572
$155,284
$190,996
$226,708
$262,420
$315,988
$351,700
$369,556
$458,836
$548,116
$619,540
Arkansas
15-19.99
17.0
$127,660
$146,536
$184,288
$222,040
$259,792
$297,544
$354,172
$391,924
$410,800
$505,180
$599,560
$675,064
Arkansas
20-29.99
23.0
$158,868
$179,043
$219,393
$259,743
$300,093
$340,443
$400,968
$441,318
$461,493
$562,368
$663,243
$743,943
Arkansas
30-39.99
34.0
$247,380
$281,442
$349,566
$417,690
$485,814
$553,938
$656,124
$724,248
$758,310
$928,620
$1,098,930
$1,235,178
Arkansas
40-59.99
46.0
$309,059
$344,982
$416,828
$488,674
$560,520
$632,366
$740,135
$811,981
$847,904
$1,027,519
$1,207,134
$1,350,826
Arkansas
60-79.99
69.0
$461,977
$516,375
$625,171
$733,967
$842,763
$951,559
$1,114,753
$1,223,549
$1,277,947
$1,549,937
$1,821,927
$2,039,519
Arkansas
80-99.99
85.1
$576,549
$645,472
$783,318
$921,164
$1,059,010
$1,196,856
$1,403,625
$1,541,471
$1,610,394
$1,955,009
$2,299,624
$2,575,316
Arkansas
100 <
145.0
$960,000
$1,069,948
$1,289,844
$1,509,740
$1,729,636
$1,949,532
$2,279,376
$2,499,272
$2,609,220
$3,158,960
$3,708,700
$4,148,492
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$26,955
$40,497
$67,581
$94,665
$121,749
$148,833
$189,459
$216,543
$230,085
$297,795
$365,505
$419,673
California
15-19.99
17.0
$46,412
$63,085
$96,431
$129,777
$163,123
$196,469
$246,488
$279,834
$296,507
$379,872
$463,237
$529,929
California
20-29.99
23.0
$48,970
$66,191
$100,633
$135,075
$169,517
$203,959
$255,622
$290,064
$307,285
$393,390
$479,495
$548,379
California
30-39.99
34.0
$53,522
$71,609
$107,783
$143,957
$180,131
$216,305
$270,566
$306,740
$324,827
$415,262
$505,697
$578,045
California
40-59.99
46.0
$58,489
$77,521
$115,585
$153,649
$191,713
$229,777
$286,873
$324,937
$343,969
$439,129
$534,289
$610,417
California
60-79.99
69.0
$68,083
$89,002
$130,840
$172,678
$214,516
$256,354
$319,111
$360,949
$381,868
$486,463
$591,058
$674,734
California
80-99.99
85.1
$106,250
$140,149
$207,947
$275,745
$343,543
$411,341
$513,038
$580,836
$614,735
$784,230
$953,725
$1,089,321
California
100 <
145.0
$139,064
$181,454
$266,234
$351,014
$435,794
$520,574
$647,744
$732,524
$774,914
$986,864
$1,198,814
$1,368,374
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$36,811
$49,352
$74,434
$99,516
$124,598
$149,680
$187,303
$212,385
$224,926
$287,631
$350,336
$400,500
1-195

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$61,421
$77,724
$110,330
$142,936
$175,542
$208,148
$257,057
$289,663
$305,966
$387,481
$468,996
$534,208
Colorado
20-29.99
23.0
$69,202
$85,847
$119,137
$152,427
$185,717
$219,007
$268,942
$302,232
$318,877
$402,102
$485,327
$551,907
Colorado
30-39.99
34.0
$83,542
$100,889
$135,583
$170,277
$204,971
$239,665
$291,706
$326,400
$343,747
$430,482
$517,217
$586,605
Colorado
40-59.99
46.0
$99,103
$117,134
$153,196
$189,258
$225,320
$261,382
$315,475
$351,537
$369,568
$459,723
$549,878
$622,002
Colorado
60-79.99
69.0
$128,930
$148,272
$186,956
$225,640
$264,324
$303,008
$361,034
$399,718
$419,060
$515,770
$612,480
$689,848
Colorado
80-99.99
85.1
$181,924
$214,508
$279,676
$344,844
$410,012
$475,180
$572,932
$638,100
$670,684
$833,604
$996,524
$1,126,860
Colorado
100 <
145.0
$266,936
$306,018
$384,182
$462,346
$540,510
$618,674
$735,920
$814,084
$853,166
$1,048,576
$1,243,986
$1,400,314
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$68,908
$86,600
$121,984
$157,368
$192,752
$228,136
$281,212
$316,596
$334,288
$422,748
$511,208
$581,976
Connecticut
15-19.99
17.0
$81,182
$99,825
$137,111
$174,397
$211,683
$248,969
$304,898
$342,184
$360,827
$454,042
$547,257
$621,829
Connecticut
20-29.99
23.0
$95,910
$115,694
$155,262
$194,830
$234,398
$273,966
$333,318
$372,886
$392,670
$491,590
$590,510
$669,646
Connecticut
30-39.99
34.0
$122,986
$144,937
$188,839
$232,741
$276,643
$320,545
$386,398
$430,300
$452,251
$562,006
$671,761
$759,565
Connecticut
40-59.99
46.0
$183,353
$218,704
$289,406
$360,108
$430,810
$501,512
$607,565
$678,267
$713,618
$890,373
$1,067,128
$1,208,532
Connecticut
60-79.99
69.0
$238,664
$277,243
$354,401
$431,559
$508,717
$585,875
$701,612
$778,770
$817,349
$1,010,244
$1,203,139
$1,357,455
Connecticut
80-99.99
85.1
$312,440
$368,544
$480,752
$592,960
$705,168
$817,376
$985,688
$1,097,896
$1,154,000
$1,434,520
$1,715,040
$1,939,456
Connecticut
100 <
145.0
$494,126
$572,230
$728,438
$884,646
$1,040,854
$1,197,062
$1,431,374
$1,587,582
$1,665,686
$2,056,206
$2,446,726
$2,759,142
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$72,340
$89,960
$125,200
$160,440
$195,680
$230,920
$283,780
$319,020
$336,640
$424,740
$512,840
$583,320
Delaware
15-19.99
17.0
$86,044
$104,585
$141,667
$178,749
$215,831
$252,913
$308,536
$345,618
$364,159
$456,864
$549,569
$623,733
Delaware
20-29.99
23.0
$102,489
$122,136
$161,430
$200,724
$240,018
$279,312
$338,253
$377,547
$397,194
$495,429
$593,664
$672,252
Delaware
30-39.99
34.0
$132,713
$154,462
$197,960
$241,458
$284,956
$328,454
$393,701
$437,199
$458,948
$567,693
$676,438
$763,434
Delaware
40-59.99
46.0
$196,591
$231,747
$302,059
$372,371
$442,683
$512,995
$618,463
$688,775
$723,931
$899,711
$1,075,491
$1,216,115
Delaware
60-79.99
69.0
$258,523
$296,811
$373,387
$449,963
$526,539
$603,115
$717,979
$794,555
$832,843
$1,024,283
$1,215,723
$1,368,875
Delaware
80-99.99
85.1
$336,882
$392,577
$503,967
$615,357
$726,747
$838,137
$1,005,222
$1,116,612
$1,172,307
$1,450,782
$1,729,257
$1,952,037
Delaware
100 <
145.0
$535,856
$613,346
$768,326
$923,306
$1,078,286
$1,233,266
$1,465,736
$1,620,716
$1,698,206
$2,085,656
$2,473,106
$2,783,066
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-196

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$71,217
$88,771
$123,879
$158,987
$194,095
$229,203
$281,865
$316,973
$334,527
$422,297
$510,067
$580,283
District of
Columbia
15-19.99
17.0
$84,453
$102,901
$139,797
$176,693
$213,589
$250,485
$305,829
$342,725
$361,173
$453,413
$545,653
$619,445
District of
Columbia
20-29.99
23.0
$100,336
$119,857
$158,899
$197,941
$236,983
$276,025
$334,588
$373,630
$393,151
$490,756
$588,361
$666,445
District of
Columbia
30-39.99
34.0
$129,530
$151,092
$194,216
$237,340
$280,464
$323,588
$388,274
$431,398
$452,960
$560,770
$668,580
$754,828
District of
Columbia
40-59.99
46.0
$192,358
$227,335
$297,289
$367,243
$437,197
$507,151
$612,082
$682,036
$717,013
$891,898
$1,066,783
$1,206,691
District of
Columbia
60-79.99
69.0
$252,173
$290,192
$366,230
$442,268
$518,306
$594,344
$708,401
$784,439
$822,458
$1,012,553
$1,202,648
$1,354,724
District of
Columbia
80-99.99
85.1
$329,005
$384,323
$494,959
$605,595
$716,231
$826,867
$992,821
$1,103,457
$1,158,775
$1,435,365
$1,711,955
$1,933,227
District of
Columbia
100 <
145.0
$522,512
$599,438
$753,290
$907,142
$1,060,994
$1,214,846
$1,445,624
$1,599,476
$1,676,402
$2,061,032
$2,445,662
$2,753,366
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$119,756
$138,352
$175,544
$212,736
$249,928
$287,120
$342,908
$380,100
$398,696
$491,676
$584,656
$659,040
Florida
15-19.99
17.0
$153,292
$173,291
$213,289
$253,287
$293,285
$333,283
$393,280
$433,278
$453,277
$553,272
$653,267
$733,263
Florida
20-29.99
23.0
$225,121
$258,598
$325,552
$392,506
$459,460
$526,414
$626,845
$693,799
$727,276
$894,661
$1,062,046
$1,195,954
Florida
30-39.99
34.0
$298,010
$333,684
$405,032
$476,380
$547,728
$619,076
$726,098
$797,446
$833,120
$1,011,490
$1,189,860
$1,332,556
Florida
40-59.99
46.0
$411,975
$464,703
$570,159
$675,615
$781,071
$886,527
$1,044,711
$1,150,167
$1,202,895
$1,466,535
$1,730,175
$1,941,087
Florida
60-79.99
69.0
$596,686
$666,523
$806,197
$945,871
$1,085,545
$1,225,219
$1,434,730
$1,574,404
$1,644,241
$1,993,426
$2,342,611
$2,621,959
Florida
80-99.99
85.1
$703,187
$776,058
$921,800
$1,067,542
$1,213,284
$1,359,026
$1,577,639
$1,723,381
$1,796,252
$2,160,607
$2,524,962
$2,816,446
Florida
100 <
145.0
$1,239,676
$1,380,668
$1,662,652
$1,944,636
$2,226,620
$2,508,604
$2,931,580
$3,213,564
$3,354,556
$4,059,516
$4,764,476
$5,328,444
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$99,042
$117,065
$153,111
$189,157
$225,203
$261,249
$315,318
$351,364
$369,387
$459,502
$549,617
$621,709
1-197

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$123,871
$142,983
$181,207
$219,431
$257,655
$295,879
$353,215
$391,439
$410,551
$506,111
$601,671
$678,119
Georgia
20-29.99
23.0
$153,741
$174,235
$215,223
$256,211
$297,199
$338,187
$399,669
$440,657
$461,151
$563,621
$666,091
$748,067
Georgia
30-39.99
34.0
$239,665
$274,062
$342,856
$411,650
$480,444
$549,238
$652,429
$721,223
$755,620
$927,605
$1,099,590
$1,237,178
Georgia
40-59.99
46.0
$298,620
$334,996
$407,748
$480,500
$553,252
$626,004
$735,132
$807,884
$844,260
$1,026,140
$1,208,020
$1,353,524
Georgia
60-79.99
69.0
$446,411
$501,581
$611,921
$722,261
$832,601
$942,941
$1,108,451
$1,218,791
$1,273,961
$1,549,811
$1,825,661
$2,046,341
Georgia
80-99.99
85.1
$525,682
$583,679
$699,673
$815,667
$931,661
$1,047,655
$1,221,646
$1,337,640
$1,395,637
$1,685,622
$1,975,607
$2,207,595
Georgia
100 <
145.0
$927,286
$1,038,854
$1,261,990
$1,485,126
$1,708,262
$1,931,398
$2,266,102
$2,489,238
$2,600,806
$3,158,646
$3,716,486
$4,162,758
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$113,464
$129,738
$162,286
$194,834
$227,382
$259,930
$308,752
$341,300
$357,574
$438,944
$520,314
$585,410
Hawaii
15-19.99
17.0
$144,335
$161,001
$194,333
$227,665
$260,997
$294,329
$344,327
$377,659
$394,325
$477,655
$560,985
$627,649
Hawaii
20-29.99
23.0
$214,331
$244,627
$305,219
$365,811
$426,403
$486,995
$577,883
$638,475
$668,771
$820,251
$971,731
$1,092,915
Hawaii
30-39.99
34.0
$281,995
$312,902
$374,716
$436,530
$498,344
$560,158
$652,879
$714,693
$745,600
$900,135
$1,054,670
$1,178,298
Hawaii
40-59.99
46.0
$389,635
$435,242
$526,456
$617,670
$708,884
$800,098
$936,919
$1,028,133
$1,073,740
$1,301,775
$1,529,810
$1,712,238
Hawaii
60-79.99
69.0
$564,242
$624,462
$744,902
$865,342
$985,782
$1,106,222
$1,286,882
$1,407,322
$1,467,542
$1,768,642
$2,069,742
$2,310,622
Hawaii
80-99.99
85.1
$663,502
$724,842
$847,522
$970,202
$1,092,882
$1,215,562
$1,399,582
$1,522,262
$1,583,602
$1,890,302
$2,197,002
$2,442,362
Hawaii
100 <
145.0
$1,171,542
$1,292,372
$1,534,032
$1,775,692
$2,017,352
$2,259,012
$2,621,502
$2,863,162
$2,983,992
$3,588,142
$4,192,292
$4,675,612
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$21,563
$33,734
$58,076
$82,418
$106,760
$131,102
$167,615
$191,957
$204,128
$264,983
$325,838
$374,522
Idaho
15-19.99
17.0
$22,447
$35,502
$61,612
$87,722
$113,832
$139,942
$179,107
$205,217
$218,272
$283,547
$348,822
$401,042
Idaho
20-29.99
23.0
$23,558
$37,724
$66,056
$94,388
$122,720
$151,052
$193,550
$221,882
$236,048
$306,878
$377,708
$434,372
Idaho
30-39.99
34.0
$25,552
$41,712
$74,032
$106,352
$138,672
$170,992
$219,472
$251,792
$267,952
$348,752
$429,552
$494,192
Idaho
40-59.99
46.0
$41,684
$59,326
$94,610
$129,894
$165,178
$200,462
$253,388
$288,672
$306,314
$394,524
$482,734
$553,302
Idaho
60-79.99
69.0
$42,801
$61,560
$99,078
$136,596
$174,114
$211,632
$267,909
$305,427
$324,186
$417,981
$511,776
$586,812
Idaho
80-99.99
85.1
$43,582
$63,122
$102,202
$141,282
$180,362
$219,442
$278,062
$317,142
$336,682
$434,382
$532,082
$610,242
Idaho
100 <
145.0
$85,940
$123,796
$199,508
$275,220
$350,932
$426,644
$540,212
$615,924
$653,780
$843,060
$1,032,340
$1,183,764
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-198

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$64,756
$81,863
$116,077
$150,291
$184,505
$218,719
$270,040
$304,254
$321,361
$406,896
$492,431
$560,859
Illinois
15-19.99
17.0
$75,300
$93,115
$128,745
$164,375
$200,005
$235,635
$289,080
$324,710
$342,525
$431,600
$520,675
$591,935
Illinois
20-29.99
23.0
$87,952
$106,616
$143,944
$181,272
$218,600
$255,928
$311,920
$349,248
$367,912
$461,232
$554,552
$629,208
Illinois
30-39.99
34.0
$111,224
$131,520
$172,112
$212,704
$253,296
$293,888
$354,776
$395,368
$415,664
$517,144
$618,624
$699,808
Illinois
40-59.99
46.0
$168,087
$201,848
$269,370
$336,892
$404,414
$471,936
$573,219
$640,741
$674,502
$843,307
$1,012,112
$1,147,156
Illinois
60-79.99
69.0
$215,769
$251,965
$324,357
$396,749
$469,141
$541,533
$650,121
$722,513
$758,709
$939,689
$1,120,669
$1,265,453
Illinois
80-99.99
85.1
$249,057
$286,869
$362,493
$438,117
$513,741
$589,365
$702,801
$778,425
$816,237
$1,005,297
$1,194,357
$1,345,605
Illinois
100 <
145.0
$446,010
$519,104
$665,292
$811,480
$957,668
$1,103,856
$1,323,138
$1,469,326
$1,542,420
$1,907,890
$2,273,360
$2,565,736
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$82,280
$99,729
$134,627
$169,525
$204,423
$239,321
$291,668
$326,566
$344,015
$431,260
$518,505
$588,301
Indiana
15-19.99
17.0
$100,124
$118,422
$155,018
$191,614
$228,210
$264,806
$319,700
$356,296
$374,594
$466,084
$557,574
$630,766
Indiana
20-29.99
23.0
$121,539
$140,857
$179,493
$218,129
$256,765
$295,401
$353,355
$391,991
$411,309
$507,899
$604,489
$681,761
Indiana
30-39.99
34.0
$160,873
$182,136
$224,662
$267,188
$309,714
$352,240
$416,029
$458,555
$479,818
$586,133
$692,448
$777,500
Indiana
40-59.99
46.0
$234,881
$269,571
$338,951
$408,331
$477,711
$547,091
$651,161
$720,541
$755,231
$928,681
$1,102,131
$1,240,891
Indiana
60-79.99
69.0
$315,958
$353,546
$428,722
$503,898
$579,074
$654,250
$767,014
$842,190
$879,778
$1,067,718
$1,255,658
$1,406,010
Indiana
80-99.99
85.1
$407,601
$462,315
$571,743
$681,171
$790,599
$900,027
$1,064,169
$1,173,597
$1,228,311
$1,501,881
$1,775,451
$1,994,307
Indiana
100 <
145.0
$656,554
$732,574
$884,614
$1,036,654
$1,188,694
$1,340,734
$1,568,794
$1,720,834
$1,796,854
$2,176,954
$2,557,054
$2,861,134
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$72,143
$89,179
$123,251
$157,323
$191,395
$225,467
$276,575
$310,647
$327,683
$412,863
$498,043
$566,187
Iowa
15-19.99
17.0
$85,765
$103,479
$138,907
$174,335
$209,763
$245,191
$298,333
$333,761
$351,475
$440,045
$528,615
$599,471
Iowa
20-29.99
23.0
$102,112
$120,640
$157,696
$194,752
$231,808
$268,864
$324,448
$361,504
$380,032
$472,672
$565,312
$639,424
Iowa
30-39.99
34.0
$132,155
$152,250
$192,440
$232,630
$272,820
$313,010
$373,295
$413,485
$433,580
$534,055
$634,530
$714,910
Iowa
40-59.99
46.0
$196,485
$230,053
$297,189
$364,325
$431,461
$498,597
$599,301
$666,437
$700,005
$867,845
$1,035,685
$1,169,957
Iowa
60-79.99
69.0
$258,365
$294,271
$366,083
$437,895
$509,707
$581,519
$689,237
$761,049
$796,955
$976,485
$1,156,015
$1,299,639
Iowa
80-99.99
85.1
$336,112
$388,294
$492,658
$597,022
$701,386
$805,750
$962,296
$1,066,660
$1,118,842
$1,379,752
$1,640,662
$1,849,390
1-199

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$535,526
$608,012
$752,984
$897,956
$1,042,928
$1,187,900
$1,405,358
$1,550,330
$1,622,816
$1,985,246
$2,347,676
$2,637,620
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$78,723
$96,017
$130,605
$165,193
$199,781
$234,369
$286,251
$320,839
$338,133
$424,603
$511,073
$580,249
Kansas
15-19.99
17.0
$95,087
$113,167
$149,327
$185,487
$221,647
$257,807
$312,047
$348,207
$366,287
$456,687
$547,087
$619,407
Kansas
20-29.99
23.0
$114,724
$133,747
$171,793
$209,839
$247,885
$285,931
$343,000
$381,046
$400,069
$495,184
$590,299
$666,391
Kansas
30-39.99
34.0
$150,798
$171,624
$213,276
$254,928
$296,580
$338,232
$400,710
$442,362
$463,188
$567,318
$671,448
$754,752
Kansas
40-59.99
46.0
$221,421
$255,691
$324,231
$392,771
$461,311
$529,851
$632,661
$701,201
$735,471
$906,821
$1,078,171
$1,215,251
Kansas
60-79.99
69.0
$295,769
$332,728
$406,646
$480,564
$554,482
$628,400
$739,277
$813,195
$850,154
$1,034,949
$1,219,744
$1,367,580
Kansas
80-99.99
85.1
$382,596
$436,429
$544,095
$651,761
$759,427
$867,093
$1,028,592
$1,136,258
$1,190,091
$1,459,256
$1,728,421
$1,943,753
Kansas
100 <
145.0
$683,138
$787,262
$995,510
$1,203,758
$1,412,006
$1,620,254
$1,932,626
$2,140,874
$2,244,998
$2,765,618
$3,286,238
$3,702,734
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$68,630
$86,352
$121,796
$157,240
$192,684
$228,128
$281,294
$316,738
$334,460
$423,070
$511,680
$582,568
Kentucky
15-19.99
17.0
$80,789
$99,475
$136,847
$174,219
$211,591
$248,963
$305,021
$342,393
$361,079
$454,509
$547,939
$622,683
Kentucky
20-29.99
23.0
$95,379
$115,222
$154,908
$194,594
$234,280
$273,966
$333,495
$373,181
$393,024
$492,239
$591,454
$670,826
Kentucky
30-39.99
34.0
$122,202
$144,241
$188,319
$232,397
$276,475
$320,553
$386,670
$430,748
$452,787
$562,982
$673,177
$761,333
Kentucky
40-59.99
46.0
$182,256
$217,690
$288,558
$359,426
$430,294
$501,162
$607,464
$678,332
$713,766
$890,936
$1,068,106
$1,209,842
Kentucky
60-79.99
69.0
$237,020
$275,725
$353,135
$430,545
$507,955
$585,365
$701,480
$778,890
$817,595
$1,011,120
$1,204,645
$1,359,465
Kentucky
80-99.99
85.1
$310,433
$366,713
$479,273
$591,833
$704,393
$816,953
$985,793
$1,098,353
$1,154,633
$1,436,033
$1,717,433
$1,942,553
Kentucky
100 <
145.0
$490,670
$569,038
$725,774
$882,510
$1,039,246
$1,195,982
$1,431,086
$1,587,822
$1,666,190
$2,058,030
$2,449,870
$2,763,342
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$137,483
$155,913
$192,773
$229,633
$266,493
$303,353
$358,643
$395,503
$413,933
$506,083
$598,233
$671,953
Louisiana
15-19.99
17.0
$178,329
$198,017
$237,393
$276,769
$316,145
$355,521
$414,585
$453,961
$473,649
$572,089
$670,529
$749,281
Louisiana
20-29.99
23.0
$259,188
$292,438
$358,938
$425,438
$491,938
$558,438
$658,188
$724,688
$757,938
$924,188
$1,090,438
$1,223,438
Louisiana
30-39.99
34.0
$348,247
$383,462
$453,892
$524,322
$594,752
$665,182
$770,827
$841,257
$876,472
$1,052,547
$1,228,622
$1,369,482
1-200

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$480,047
$532,260
$636,686
$741,112
$845,538
$949,964
$1,106,603
$1,211,029
$1,263,242
$1,524,307
$1,785,372
$1,994,224
Louisiana
60-79.99
69.0
$698,664
$767,597
$905,463
$1,043,329
$1,181,195
$1,319,061
$1,525,860
$1,663,726
$1,732,659
$2,077,324
$2,421,989
$2,697,721
Louisiana
80-99.99
85.1
$863,783
$950,570
$1,124,144
$1,297,718
$1,471,292
$1,644,866
$1,905,227
$2,078,801
$2,165,588
$2,599,523
$3,033,458
$3,380,606
Louisiana
100 <
145.0
$1,454,450
$1,594,016
$1,873,148
$2,152,280
$2,431,412
$2,710,544
$3,129,242
$3,408,374
$3,547,940
$4,245,770
$4,943,600
$5,501,864
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$66,406
$83,956
$119,056
$154,156
$189,256
$224,356
$277,006
$312,106
$329,656
$417,406
$505,156
$575,356
Maine
15-19.99
17.0
$77,639
$96,082
$132,968
$169,854
$206,740
$243,626
$298,955
$335,841
$354,284
$446,499
$538,714
$612,486
Maine
20-29.99
23.0
$91,116
$110,629
$149,655
$188,681
$227,707
$266,733
$325,272
$364,298
$383,811
$481,376
$578,941
$656,993
Maine
30-39.99
34.0
$115,900
$137,451
$180,553
$223,655
$266,757
$309,859
$374,512
$417,614
$439,165
$546,920
$654,675
$740,879
Maine
40-59.99
46.0
$173,921
$208,887
$278,819
$348,751
$418,683
$488,615
$593,513
$663,445
$698,411
$873,241
$1,048,071
$1,187,935
Maine
60-79.99
69.0
$224,519
$262,522
$338,528
$414,534
$490,540
$566,546
$680,555
$756,561
$794,564
$984,579
$1,174,594
$1,326,606
Maine
80-99.99
85.1
$259,975
$300,141
$380,473
$460,805
$541,137
$621,469
$741,967
$822,299
$862,465
$1,063,295
$1,264,125
$1,424,789
Maine
100 <
145.0
$464,400
$541,292
$695,076
$848,860
$1,002,644
$1,156,428
$1,387,104
$1,540,888
$1,617,780
$2,002,240
$2,386,700
$2,694,268
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$71,245
$88,827
$123,991
$159,155
$194,319
$229,483
$282,229
$317,393
$334,975
$422,885
$510,795
$581,123
Maryland
15-19.99
17.0
$84,493
$102,981
$139,957
$176,933
$213,909
$250,885
$306,349
$343,325
$361,813
$454,253
$546,693
$620,645
Maryland
20-29.99
23.0
$100,389
$119,963
$159,111
$198,259
$237,407
$276,555
$335,277
$374,425
$393,999
$491,869
$589,739
$668,035
Maryland
30-39.99
34.0
$129,609
$151,250
$194,532
$237,814
$281,096
$324,378
$389,301
$432,583
$454,224
$562,429
$670,634
$757,198
Maryland
40-59.99
46.0
$192,434
$227,487
$297,593
$367,699
$437,805
$507,911
$613,070
$683,176
$718,229
$893,494
$1,068,759
$1,208,971
Maryland
60-79.99
69.0
$252,287
$290,420
$366,686
$442,952
$519,218
$595,484
$709,883
$786,149
$824,282
$1,014,947
$1,205,612
$1,358,144
Maryland
80-99.99
85.1
$329,165
$384,643
$495,599
$606,555
$717,511
$828,467
$994,901
$1,105,857
$1,161,335
$1,438,725
$1,716,115
$1,938,027
Maryland
100 <
145.0
$522,750
$599,914
$754,242
$908,570
$1,062,898
$1,217,226
$1,448,718
$1,603,046
$1,680,210
$2,066,030
$2,451,850
$2,760,506
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$68,283
$85,871
$121,047
$156,223
$191,399
$226,575
$279,339
$314,515
$332,103
$420,043
$507,983
$578,335
1-201

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$80,297
$98,793
$135,785
$172,777
$209,769
$246,761
$302,249
$339,241
$357,737
$450,217
$542,697
$616,681
Massachusetts
20-29.99
23.0
$94,713
$114,299
$153,471
$192,643
$231,815
$270,987
$329,745
$368,917
$388,503
$486,433
$584,363
$662,707
Massachusetts
30-39.99
34.0
$121,219
$142,878
$186,196
$229,514
$272,832
$316,150
$381,127
$424,445
$446,104
$554,399
$662,694
$749,330
Massachusetts
40-59.99
46.0
$181,075
$216,145
$286,285
$356,425
$426,565
$496,705
$601,915
$672,055
$707,125
$882,475
$1,057,825
$1,198,105
Massachusetts
60-79.99
69.0
$235,248
$273,406
$349,722
$426,038
$502,354
$578,670
$693,144
$769,460
$807,618
$998,408
$1,189,198
$1,341,830
Massachusetts
80-99.99
85.1
$308,155
$363,668
$474,694
$585,720
$696,746
$807,772
$974,311
$1,085,337
$1,140,850
$1,418,415
$1,695,980
$1,918,032
Massachusetts
100 <
145.0
$486,946
$564,164
$718,600
$873,036
$1,027,472
$1,181,908
$1,413,562
$1,567,998
$1,645,216
$2,031,306
$2,417,396
$2,726,268
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$32,550
$48,368
$80,004
$111,640
$143,276
$174,912
$222,366
$254,002
$269,820
$348,910
$428,000
$491,272
Michigan
15-19.99
17.0
$52,054
$69,668
$104,896
$140,124
$175,352
$210,580
$263,422
$298,650
$316,264
$404,334
$492,404
$562,860
Michigan
20-29.99
23.0
$56,503
$74,895
$111,679
$148,463
$185,247
$222,031
$277,207
$313,991
$332,383
$424,343
$516,303
$589,871
Michigan
30-39.99
34.0
$64,658
$84,477
$124,115
$163,753
$203,391
$243,029
$302,486
$342,124
$361,943
$461,038
$560,133
$639,409
Michigan
40-59.99
46.0
$73,629
$95,079
$137,979
$180,879
$223,779
$266,679
$331,029
$373,929
$395,379
$502,629
$609,879
$695,679
Michigan
60-79.99
69.0
$121,657
$157,274
$228,508
$299,742
$370,976
$442,210
$549,061
$620,295
$655,912
$833,997
$1,012,082
$1,154,550
Michigan
80-99.99
85.1
$132,986
$170,084
$244,280
$318,476
$392,672
$466,868
$578,162
$652,358
$689,456
$874,946
$1,060,436
$1,208,828
Michigan
100 <
145.0
$248,238
$320,116
$463,872
$607,628
$751,384
$895,140
$1,110,774
$1,254,530
$1,326,408
$1,685,798
$2,045,188
$2,332,700
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$61,746
$78,558
$112,182
$145,806
$179,430
$213,054
$263,490
$297,114
$313,926
$397,986
$482,046
$549,294
Minnesota
15-19.99
17.0
$71,142
$88,645
$123,651
$158,657
$193,663
$228,669
$281,178
$316,184
$333,687
$421,202
$508,717
$578,729
Minnesota
20-29.99
23.0
$82,326
$100,568
$137,052
$173,536
$210,020
$246,504
$301,230
$337,714
$355,956
$447,166
$538,376
$611,344
Minnesota
30-39.99
34.0
$102,831
$122,427
$161,619
$200,811
$240,003
$279,195
$337,983
$377,175
$396,771
$494,751
$592,731
$671,115
Minnesota
40-59.99
46.0
$125,276
$146,425
$188,723
$231,021
$273,319
$315,617
$379,064
$421,362
$442,511
$548,256
$654,001
$738,597
Minnesota
60-79.99
69.0
$199,133
$234,305
$304,649
$374,993
$445,337
$515,681
$621,197
$691,541
$726,713
$902,573
$1,078,433
$1,219,121
Minnesota
80-99.99
85.1
$228,694
$265,397
$338,803
$412,209
$485,615
$559,021
$669,130
$742,536
$779,239
$962,754
$1,146,269
$1,293,081
Minnesota
100 <
145.0
$411,312
$482,516
$624,924
$767,332
$909,740
$1,052,148
$1,265,760
$1,408,168
$1,479,372
$1,835,392
$2,191,412
$2,476,228
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-202

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$109,606
$127,712
$163,924
$200,136
$236,348
$272,560
$326,878
$363,090
$381,196
$471,726
$562,256
$634,680
Mississippi
15-19.99
17.0
$138,837
$158,067
$196,527
$234,987
$273,447
$311,907
$369,597
$408,057
$427,287
$523,437
$619,587
$696,507
Mississippi
20-29.99
23.0
$173,989
$194,642
$235,948
$277,254
$318,560
$359,866
$421,825
$463,131
$483,784
$587,049
$690,314
$772,926
Mississippi
30-39.99
34.0
$269,529
$304,093
$373,221
$442,349
$511,477
$580,605
$684,297
$753,425
$787,989
$960,809
$1,133,629
$1,271,885
Mississippi
40-59.99
46.0
$339,026
$375,629
$448,835
$522,041
$595,247
$668,453
$778,262
$851,468
$888,071
$1,071,086
$1,254,101
$1,400,513
Mississippi
60-79.99
69.0
$507,065
$562,621
$673,733
$784,845
$895,957
$1,007,069
$1,173,737
$1,284,849
$1,340,405
$1,618,185
$1,895,965
$2,118,189
Mississippi
80-99.99
85.1
$632,212
$702,617
$843,427
$984,237
$1,125,047
$1,265,857
$1,477,072
$1,617,882
$1,688,287
$2,040,312
$2,392,337
$2,673,957
Mississippi
100 <
145.0
$1,118,294
$1,254,636
$1,527,320
$1,800,004
$2,072,688
$2,345,372
$2,754,398
$3,027,082
$3,163,424
$3,845,134
$4,526,844
$5,072,212
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$80,597
$97,894
$132,488
$167,082
$201,676
$236,270
$288,161
$322,755
$340,052
$426,537
$513,022
$582,210
Missour

15-19.99
17.0
$97,740
$115,823
$151,989
$188,155
$224,321
$260,487
$314,736
$350,902
$368,985
$459,400
$549,815
$622,147
Missour

20-29.99
23.0
$118,313
$137,340
$175,394
$213,448
$251,502
$289,556
$346,637
$384,691
$403,718
$498,853
$593,988
$670,096
Missour

30-39.99
34.0
$188,001
$220,938
$286,812
$352,686
$418,560
$484,434
$583,245
$649,119
$682,056
$846,741
$1,011,426
$1,143,174
Missour

40-59.99
46.0
$228,598
$262,874
$331,426
$399,978
$468,530
$537,082
$639,910
$708,462
$742,738
$914,118
$1,085,498
$1,222,602
Missour

60-79.99
69.0
$340,986
$392,614
$495,870
$599,126
$702,382
$805,638
$960,522
$1,063,778
$1,115,406
$1,373,546
$1,631,686
$1,838,198
Missour

80-99.99
85.1
$395,873
$449,718
$557,408
$665,098
$772,788
$880,478
$1,042,013
$1,149,703
$1,203,548
$1,472,773
$1,741,998
$1,957,378
Missour

100 <
145.0
$705,760
$809,904
$1,018,192
$1,226,480
$1,434,768
$1,643,056
$1,955,488
$2,163,776
$2,267,920
$2,788,640
$3,309,360
$3,725,936
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$22,815
$35,070
$59,580
$84,090
$108,600
$133,110
$169,875
$194,385
$206,640
$267,915
$329,190
$378,210
Montana
15-19.99
17.0
$24,220
$37,393
$63,739
$90,085
$116,431
$142,777
$182,296
$208,642
$221,815
$287,680
$353,545
$406,237
Montana
20-29.99
23.0
$25,956
$40,281
$68,931
$97,581
$126,231
$154,881
$197,856
$226,506
$240,831
$312,456
$384,081
$441,381
Montana
30-39.99
34.0
$44,476
$61,600
$95,848
$130,096
$164,344
$198,592
$249,964
$284,212
$301,336
$386,956
$472,576
$541,072
Montana
40-59.99
46.0
$46,250
$63,980
$99,440
$134,900
$170,360
$205,820
$259,010
$294,470
$312,200
$400,850
$489,500
$560,420
Montana
60-79.99
69.0
$49,649
$68,539
$106,319
$144,099
$181,879
$219,659
$276,329
$314,109
$332,999
$427,449
$521,899
$597,459
Montana
80-99.99
85.1
$52,028
$71,730
$111,134
$150,538
$189,942
$229,346
$288,452
$327,856
$347,558
$446,068
$544,578
$623,386
1-203

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$100,332
$138,466
$214,734
$291,002
$367,270
$443,538
$557,940
$634,208
$672,342
$863,012
$1,053,682
$1,206,218
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$71,454
$88,243
$121,821
$155,399
$188,977
$222,555
$272,922
$306,500
$323,289
$407,234
$491,179
$558,335
Nebraska
15-19.99
17.0
$84,896
$102,367
$137,309
$172,251
$207,193
$242,135
$294,548
$329,490
$346,961
$434,316
$521,671
$591,555
Nebraska
20-29.99
23.0
$100,934
$119,132
$155,528
$191,924
$228,320
$264,716
$319,310
$355,706
$373,904
$464,894
$555,884
$628,676
Nebraska
30-39.99
34.0
$130,340
$149,872
$188,936
$228,000
$267,064
$306,128
$364,724
$403,788
$423,320
$520,980
$618,640
$696,768
Nebraska
40-59.99
46.0
$162,493
$183,555
$225,679
$267,803
$309,927
$352,051
$415,237
$457,361
$478,423
$583,733
$689,043
$773,291
Nebraska
60-79.99
69.0
$254,996
$290,075
$360,233
$430,391
$500,549
$570,707
$675,944
$746,102
$781,181
$956,576
$1,131,971
$1,272,287
Nebraska
80-99.99
85.1
$297,593
$334,182
$407,360
$480,538
$553,716
$626,894
$736,661
$809,839
$846,428
$1,029,373
$1,212,318
$1,358,674
Nebraska
100 <
145.0
$528,458
$599,218
$740,738
$882,258
$1,023,778
$1,165,298
$1,377,578
$1,519,098
$1,589,858
$1,943,658
$2,297,458
$2,580,498
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$20,107
$30,822
$52,252
$73,682
$95,112
$116,542
$148,687
$170,117
$180,832
$234,407
$287,982
$330,842
Nevada
15-19.99
17.0
$20,404
$31,416
$53,440
$75,464
$97,488
$119,512
$152,548
$174,572
$185,584
$240,644
$295,704
$339,752
Nevada
20-29.99
23.0
$20,812
$32,232
$55,072
$77,912
$100,752
$123,592
$157,852
$180,692
$192,112
$249,212
$306,312
$351,992
Nevada
30-39.99
34.0
$21,467
$33,542
$57,692
$81,842
$105,992
$130,142
$166,367
$190,517
$202,592
$262,967
$323,342
$371,642
Nevada
40-59.99
46.0
$40,128
$56,214
$88,386
$120,558
$152,730
$184,902
$233,160
$265,332
$281,418
$361,848
$442,278
$506,622
Nevada
60-79.99
69.0
$40,505
$56,968
$89,894
$122,820
$155,746
$188,672
$238,061
$270,987
$287,450
$369,765
$452,080
$517,932
Nevada
80-99.99
85.1
$40,768
$57,494
$90,946
$124,398
$157,850
$191,302
$241,480
$274,932
$291,658
$375,288
$458,918
$525,822
Nevada
100 <
145.0
$81,124
$114,164
$180,244
$246,324
$312,404
$378,484
$477,604
$543,684
$576,724
$741,924
$907,124
$1,039,284
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$60,965
$78,441
$113,393
$148,345
$183,297
$218,249
$270,677
$305,629
$323,105
$410,485
$497,865
$567,769
1-204

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$69,930
$88,268
$124,944
$161,620
$198,296
$234,972
$289,986
$326,662
$345,000
$436,690
$528,380
$601,732
New
Hampshire
20-29.99
23.0
$80,688
$100,060
$138,804
$177,548
$216,292
$255,036
$313,152
$351,896
$371,268
$468,128
$564,988
$642,476
New
Hampshire
30-39.99
34.0
$100,485
$121,827
$164,511
$207,195
$249,879
$292,563
$356,589
$399,273
$420,615
$527,325
$634,035
$719,403
New
Hampshire
40-59.99
46.0
$122,074
$145,558
$192,526
$239,494
$286,462
$333,430
$403,882
$450,850
$474,334
$591,754
$709,174
$803,110
New
Hampshire
60-79.99
69.0
$193,358
$231,060
$306,464
$381,868
$457,272
$532,676
$645,782
$721,186
$758,888
$947,398
$1,135,908
$1,286,716
New
Hampshire
80-99.99
85.1
$221,418
$261,088
$340,428
$419,768
$499,108
$578,448
$697,458
$776,798
$816,468
$1,014,818
$1,213,168
$1,371,848
New
Hampshire
100 <
145.0
$398,914
$475,172
$627,688
$780,204
$932,720
$1,085,236
$1,314,010
$1,466,526
$1,542,784
$1,924,074
$2,305,364
$2,610,396
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$89,900
$107,724
$143,372
$179,020
$214,668
$250,316
$303,788
$339,436
$357,260
$446,380
$535,500
$606,796
New Jersey
15-19.99
17.0
$110,922
$129,753
$167,415
$205,077
$242,739
$280,401
$336,894
$374,556
$393,387
$487,542
$581,697
$657,021
New Jersey
20-29.99
23.0
$136,221
$156,334
$196,560
$236,786
$277,012
$317,238
$377,577
$417,803
$437,916
$538,481
$639,046
$719,498
New Jersey
30-39.99
34.0
$182,466
$204,793
$249,447
$294,101
$338,755
$383,409
$450,390
$495,044
$517,371
$629,006
$740,641
$829,949
New Jersey
40-59.99
46.0
$263,801
$299,637
$371,309
$442,981
$514,653
$586,325
$693,833
$765,505
$801,341
$980,521
$1,159,701
$1,303,045
New Jersey
60-79.99
69.0
$359,152
$398,273
$476,515
$554,757
$632,999
$711,241
$828,604
$906,846
$945,967
$1,141,572
$1,337,177
$1,493,661
New Jersey
80-99.99
85.1
$461,131
$517,993
$631,717
$745,441
$859,165
$972,889
$1,143,475
$1,257,199
$1,314,061
$1,598,371
$1,882,681
$2,110,129
New Jersey
100 <
145.0
$747,322
$826,562
$985,042
$1,143,522
$1,302,002
$1,460,482
$1,698,202
$1,856,682
$1,935,922
$2,332,122
$2,728,322
$3,045,282
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$22,335
$35,278
$61,164
$87,050
$112,936
$138,822
$177,651
$203,537
$216,480
$281,195
$345,910
$397,682
New Mexico
15-19.99
17.0
$23,590
$37,788
$66,184
$94,580
$122,976
$151,372
$193,966
$222,362
$236,560
$307,550
$378,540
$435,332
New Mexico
20-29.99
23.0
$40,974
$57,906
$91,770
$125,634
$159,498
$193,362
$244,158
$278,022
$294,954
$379,614
$464,274
$532,002
New Mexico
30-39.99
34.0
$41,702
$59,362
$94,682
$130,002
$165,322
$200,642
$253,622
$288,942
$306,602
$394,902
$483,202
$553,842
New Mexico
40-59.99
46.0
$42,496
$60,950
$97,858
$134,766
$171,674
$208,582
$263,944
$300,852
$319,306
$411,576
$503,846
$577,662
New Mexico
60-79.99
69.0
$44,094
$64,146
$104,250
$144,354
$184,458
$224,562
$284,718
$324,822
$344,874
$445,134
$545,394
$625,602
1-205

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$45,160
$66,278
$108,514
$150,750
$192,986
$235,222
$298,576
$340,812
$361,930
$467,520
$573,110
$657,582
New Mexico
100 <
145.0
$88,650
$129,216
$210,348
$291,480
$372,612
$453,744
$575,442
$656,574
$697,140
$899,970
$1,102,800
$1,265,064
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$66,415
$83,721
$118,333
$152,945
$187,557
$222,169
$274,087
$308,699
$326,005
$412,535
$499,065
$568,289
New York
15-19.99
17.0
$77,649
$95,745
$131,937
$168,129
$204,321
$240,513
$294,801
$330,993
$349,089
$439,569
$530,049
$602,433
New York
20-29.99
23.0
$91,132
$110,177
$148,267
$186,357
$224,447
$262,537
$319,672
$357,762
$376,807
$472,032
$567,257
$643,437
New York
30-39.99
34.0
$115,924
$136,783
$178,501
$220,219
$261,937
$303,655
$366,232
$407,950
$428,809
$533,104
$637,399
$720,835
New York
40-59.99
46.0
$174,226
$208,528
$277,132
$345,736
$414,340
$482,944
$585,850
$654,454
$688,756
$860,266
$1,031,776
$1,168,984
New York
60-79.99
69.0
$224,974
$261,980
$335,992
$410,004
$484,016
$558,028
$669,046
$743,058
$780,064
$965,094
$1,150,124
$1,298,148
New York
80-99.99
85.1
$260,412
$299,224
$376,848
$454,472
$532,096
$609,720
$726,156
$803,780
$842,592
$1,036,652
$1,230,712
$1,385,960
New York
100 <
145.0
$465,354
$540,150
$689,742
$839,334
$988,926
$1,138,518
$1,362,906
$1,512,498
$1,587,294
$1,961,274
$2,335,254
$2,634,438
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$89,689
$107,318
$142,576
$177,834
$213,092
$248,350
$301,237
$336,495
$354,124
$442,269
$530,414
$600,930
North Carolina
15-19.99
17.0
$110,622
$129,176
$166,284
$203,392
$240,500
$277,608
$333,270
$370,378
$388,932
$481,702
$574,472
$648,688
North Carolina
20-29.99
23.0
$135,740
$155,403
$194,729
$234,055
$273,381
$312,707
$371,696
$411,022
$430,685
$529,000
$627,315
$705,967
North Carolina
30-39.99
34.0
$181,867
$203,640
$247,186
$290,732
$334,278
$377,824
$443,143
$486,689
$508,462
$617,327
$726,192
$813,284
North Carolina
40-59.99
46.0
$263,084
$298,263
$368,621
$438,979
$509,337
$579,695
$685,232
$755,590
$790,769
$966,664
$1,142,559
$1,283,275
North Carolina
60-79.99
69.0
$358,262
$396,584
$473,228
$549,872
$626,516
$703,160
$818,126
$894,770
$933,092
$1,124,702
$1,316,312
$1,469,600
North Carolina
80-99.99
85.1
$459,901
$515,645
$627,133
$738,621
$850,109
$961,597
$1,128,829
$1,240,317
$1,296,061
$1,574,781
$1,853,501
$2,076,477
North Carolina
100 <
145.0
$745,456
$823,020
$978,148
$1,133,276
$1,288,404
$1,443,532
$1,676,224
$1,831,352
$1,908,916
$2,296,736
$2,684,556
$2,994,812
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$22,453
$35,514
$61,636
$87,758
$113,880
$140,002
$179,185
$205,307
$218,368
$283,673
$348,978
$401,222
North Dakota
15-19.99
17.0
$23,757
$38,122
$66,852
$95,582
$124,312
$153,042
$196,137
$224,867
$239,232
$311,057
$382,882
$440,342
North Dakota
20-29.99
23.0
$41,036
$58,030
$92,018
$126,006
$159,994
$193,982
$244,964
$278,952
$295,946
$380,916
$465,886
$533,862
1-206

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$41,793
$59,544
$95,046
$130,548
$166,050
$201,552
$254,805
$290,307
$308,058
$396,813
$485,568
$556,572
North Dakota
40-59.99
46.0
$42,620
$61,198
$98,354
$135,510
$172,666
$209,822
$265,556
$302,712
$321,290
$414,180
$507,070
$581,382
North Dakota
60-79.99
69.0
$44,280
$64,518
$104,994
$145,470
$185,946
$226,422
$287,136
$327,612
$347,850
$449,040
$550,230
$631,182
North Dakota
80-99.99
85.1
$45,389
$66,736
$109,430
$152,124
$194,818
$237,512
$301,553
$344,247
$365,594
$472,329
$579,064
$664,452
North Dakota
100 <
145.0
$89,042
$130,000
$211,916
$293,832
$375,748
$457,664
$580,538
$662,454
$703,412
$908,202
$1,112,992
$1,276,824
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$76,602
$93,953
$128,655
$163,357
$198,059
$232,761
$284,814
$319,516
$336,867
$423,622
$510,377
$579,781
Ohio
15-19.99
17.0
$92,081
$110,241
$146,561
$182,881
$219,201
$255,521
$310,001
$346,321
$364,481
$455,281
$546,081
$618,721
Ohio
20-29.99
23.0
$110,657
$129,788
$168,050
$206,312
$244,574
$282,836
$340,229
$378,491
$397,622
$493,277
$588,932
$665,456
Ohio
30-39.99
34.0
$144,787
$165,774
$207,748
$249,722
$291,696
$333,670
$396,631
$438,605
$459,592
$564,527
$669,462
$753,410
Ohio
40-59.99
46.0
$182,013
$205,017
$251,025
$297,033
$343,041
$389,049
$458,061
$504,069
$527,073
$642,093
$757,113
$849,129
Ohio
60-79.99
69.0
$283,475
$320,665
$395,045
$469,425
$543,805
$618,185
$729,755
$804,135
$841,325
$1,027,275
$1,213,225
$1,361,985
Ohio
80-99.99
85.1
$332,562
$371,601
$449,679
$527,757
$605,835
$683,913
$801,030
$879,108
$918,147
$1,113,342
$1,308,537
$1,464,693
Ohio
100 <
145.0
$588,292
$663,476
$813,844
$964,212
$1,114,580
$1,264,948
$1,490,500
$1,640,868
$1,716,052
$2,091,972
$2,467,892
$2,768,628
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$85,209
$102,304
$136,494
$170,684
$204,874
$239,064
$290,349
$324,539
$341,634
$427,109
$512,584
$580,964
Oklahoma
15-19.99
17.0
$104,276
$122,074
$157,670
$193,266
$228,862
$264,458
$317,852
$353,448
$371,246
$460,236
$549,226
$620,418
Oklahoma
20-29.99
23.0
$127,155
$145,796
$183,078
$220,360
$257,642
$294,924
$350,847
$388,129
$406,770
$499,975
$593,180
$667,744
Oklahoma
30-39.99
34.0
$201,238
$233,771
$298,837
$363,903
$428,969
$494,035
$591,634
$656,700
$689,233
$851,898
$1,014,563
$1,144,695
Oklahoma
40-59.99
46.0
$246,506
$280,235
$347,693
$415,151
$482,609
$550,067
$651,254
$718,712
$752,441
$921,086
$1,089,731
$1,224,647
Oklahoma
60-79.99
69.0
$367,737
$418,433
$519,825
$621,217
$722,609
$824,001
$976,089
$1,077,481
$1,128,177
$1,381,657
$1,635,137
$1,837,921
Oklahoma
80-99.99
85.1
$428,691
$481,211
$586,251
$691,291
$796,331
$901,371
$1,058,931
$1,163,971
$1,216,491
$1,479,091
$1,741,691
$1,951,771
Oklahoma
100 <
145.0
$761,974
$864,158
$1,068,526
$1,272,894
$1,477,262
$1,681,630
$1,988,182
$2,192,550
$2,294,734
$2,805,654
$3,316,574
$3,725,310
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-207

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$56,500
$74,002
$109,006
$144,010
$179,014
$214,018
$266,524
$301,528
$319,030
$406,540
$494,050
$564,058
Oregon
15-19.99
17.0
$63,604
$81,978
$118,726
$155,474
$192,222
$228,970
$284,092
$320,840
$339,214
$431,084
$522,954
$596,450
Oregon
20-29.99
23.0
$72,129
$91,549
$130,389
$169,229
$208,069
$246,909
$305,169
$344,009
$363,429
$460,529
$557,629
$635,309
Oregon
30-39.99
34.0
$87,833
$109,247
$152,075
$194,903
$237,731
$280,559
$344,801
$387,629
$409,043
$516,113
$623,183
$708,839
Oregon
40-59.99
46.0
$104,956
$128,537
$175,699
$222,861
$270,023
$317,185
$387,928
$435,090
$458,671
$576,576
$694,481
$788,805
Oregon
60-79.99
69.0
$167,639
$205,444
$281,054
$356,664
$432,274
$507,884
$621,299
$696,909
$734,714
$923,739
$1,112,764
$1,263,984
Oregon
80-99.99
85.1
$189,822
$229,744
$309,588
$389,432
$469,276
$549,120
$668,886
$748,730
$788,652
$988,262
$1,187,872
$1,347,560
Oregon
100 <
145.0
$344,868
$421,344
$574,296
$727,248
$880,200
$1,033,152
$1,262,580
$1,415,532
$1,492,008
$1,874,388
$2,256,768
$2,562,672
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$63,326
$80,874
$115,970
$151,066
$186,162
$221,258
$273,902
$308,998
$326,546
$414,286
$502,026
$572,218
Pennsylvania
15-19.99
17.0
$73,274
$91,713
$128,591
$165,469
$202,347
$239,225
$294,542
$331,420
$349,859
$442,054
$534,249
$608,005
Pennsylvania
20-29.99
23.0
$85,211
$104,719
$143,735
$182,751
$221,767
$260,783
$319,307
$358,323
$377,831
$475,371
$572,911
$650,943
Pennsylvania
30-39.99
34.0
$107,172
$128,716
$171,804
$214,892
$257,980
$301,068
$365,700
$408,788
$430,332
$538,052
$645,772
$731,948
Pennsylvania
40-59.99
46.0
$162,115
$197,074
$266,992
$336,910
$406,828
$476,746
$581,623
$651,541
$686,500
$861,295
$1,036,090
$1,175,926
Pennsylvania
60-79.99
69.0
$206,810
$244,803
$320,789
$396,775
$472,761
$548,747
$662,726
$738,712
$776,705
$966,670
$1,156,635
$1,308,607
Pennsylvania
80-99.99
85.1
$273,053
$328,334
$438,896
$549,458
$660,020
$770,582
$936,425
$1,046,987
$1,102,268
$1,378,673
$1,655,078
$1,876,202
Pennsylvania
100 <
145.0
$427,184
$504,054
$657,794
$811,534
$965,274
$1,119,014
$1,349,624
$1,503,364
$1,580,234
$1,964,584
$2,348,934
$2,656,414
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$84,678
$102,386
$137,802
$173,218
$208,634
$244,050
$297,174
$332,590
$350,298
$438,838
$527,378
$598,210
Rhode Island
15-19.99
17.0
$103,523
$122,190
$159,524
$196,858
$234,192
$271,526
$327,527
$364,861
$383,528
$476,863
$570,198
$644,866
Rhode Island
20-29.99
23.0
$126,136
$145,952
$185,584
$225,216
$264,848
$304,480
$363,928
$403,560
$423,376
$522,456
$621,536
$700,800
Rhode Island
30-39.99
34.0
$167,670
$189,669
$233,667
$277,665
$321,663
$365,661
$431,658
$475,656
$497,655
$607,650
$717,645
$805,641
Rhode Island
40-59.99
46.0
$243,786
$279,182
$349,974
$420,766
$491,558
$562,350
$668,538
$739,330
$774,726
$951,706
$1,128,686
$1,270,270
Rhode Island
60-79.99
69.0
$329,317
$367,965
$445,261
$522,557
$599,853
$677,149
$793,093
$870,389
$909,037
$1,102,277
$1,295,517
$1,450,109
Rhode Island
80-99.99
85.1
$424,255
$480,455
$592,855
$705,255
$817,655
$930,055
$1,098,655
$1,211,055
$1,267,255
$1,548,255
$1,829,255
$2,054,055
Rhode Island
100 <
145.0
$684,626
$762,874
$919,370
$1,075,866
$1,232,362
$1,388,858
$1,623,602
$1,780,098
$1,858,346
$2,249,586
$2,640,826
$2,953,818
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-208

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$82,481
$100,226
$135,716
$171,206
$206,696
$242,186
$295,421
$330,911
$348,656
$437,381
$526,106
$597,086
South Carolina
15-19.99
17.0
$100,410
$119,128
$156,564
$194,000
$231,436
$268,872
$325,026
$362,462
$381,180
$474,770
$568,360
$643,232
South Carolina
20-29.99
23.0
$122,000
$141,961
$181,883
$221,805
$261,727
$301,649
$361,532
$401,454
$421,415
$521,220
$621,025
$700,869
South Carolina
30-39.99
34.0
$192,972
$226,810
$294,486
$362,162
$429,838
$497,514
$599,028
$666,704
$700,542
$869,732
$1,038,922
$1,174,274
South Carolina
40-59.99
46.0
$235,449
$271,070
$342,312
$413,554
$484,796
$556,038
$662,901
$734,143
$769,764
$947,869
$1,125,974
$1,268,458
South Carolina
60-79.99
69.0
$351,499
$405,381
$513,145
$620,909
$728,673
$836,437
$998,083
$1,105,847
$1,159,729
$1,429,139
$1,698,549
$1,914,077
South Carolina
80-99.99
85.1
$408,624
$465,033
$577,851
$690,669
$803,487
$916,305
$1,085,532
$1,198,350
$1,254,759
$1,536,804
$1,818,849
$2,044,485
South Carolina
100 <
145.0
$727,834
$836,696
$1,054,420
$1,272,144
$1,489,868
$1,707,592
$2,034,178
$2,251,902
$2,360,764
$2,905,074
$3,449,384
$3,884,832
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$31,491
$44,553
$70,677
$96,801
$122,925
$149,049
$188,235
$214,359
$227,421
$292,731
$358,041
$410,289
South Dakota
15-19.99
17.0
$53,350
$69,856
$102,868
$135,880
$168,892
$201,904
$251,422
$284,434
$300,940
$383,470
$466,000
$532,024
South Dakota
20-29.99
23.0
$58,357
$75,351
$109,339
$143,327
$177,315
$211,303
$262,285
$296,273
$313,267
$398,237
$483,207
$551,183
South Dakota
30-39.99
34.0
$67,400
$85,153
$120,659
$156,165
$191,671
$227,177
$280,436
$315,942
$333,695
$422,460
$511,225
$582,237
South Dakota
40-59.99
46.0
$77,264
$95,844
$133,004
$170,164
$207,324
$244,484
$300,224
$337,384
$355,964
$448,864
$541,764
$616,084
South Dakota
60-79.99
69.0
$128,314
$160,831
$225,865
$290,899
$355,933
$420,967
$518,518
$583,552
$616,069
$778,654
$941,239
$1,071,307
South Dakota
80-99.99
85.1
$141,226
$174,531
$241,141
$307,751
$374,361
$440,971
$540,886
$607,496
$640,801
$807,326
$973,851
$1,107,071
South Dakota
100 <
145.0
$262,244
$327,622
$458,378
$589,134
$719,890
$850,646
$1,046,780
$1,177,536
$1,242,914
$1,569,804
$1,896,694
$2,158,206
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$77,298
$95,077
$130,635
$166,193
$201,751
$237,309
$290,646
$326,204
$343,983
$432,878
$521,773
$592,889
Tennessee
15-19.99
17.0
$93,067
$111,833
$149,365
$186,897
$224,429
$261,961
$318,259
$355,791
$374,557
$468,387
$562,217
$637,281
Tennessee
20-29.99
23.0
$112,066
$132,092
$172,144
$212,196
$252,248
$292,300
$352,378
$392,430
$412,456
$512,586
$612,716
$692,820
Tennessee
30-39.99
34.0
$146,759
$168,957
$213,353
$257,749
$302,145
$346,541
$413,135
$457,531
$479,729
$590,719
$701,709
$790,501
Tennessee
40-59.99
46.0
$215,542
$251,254
$322,678
$394,102
$465,526
$536,950
$644,086
$715,510
$751,222
$929,782
$1,108,342
$1,251,190
Tennessee
60-79.99
69.0
$286,763
$325,698
$403,568
$481,438
$559,308
$637,178
$753,983
$831,853
$870,788
$1,065,463
$1,260,138
$1,415,878
1-209

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$371,820
$428,422
$541,626
$654,830
$768,034
$881,238
$1,051,044
$1,164,248
$1,220,850
$1,503,860
$1,786,870
$2,013,278
Tennessee
100 <
145.0
$665,126
$774,318
$992,702
$1,211,086
$1,429,470
$1,647,854
$1,975,430
$2,193,814
$2,303,006
$2,848,966
$3,394,926
$3,831,694
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$94,815
$111,895
$146,055
$180,215
$214,375
$248,535
$299,775
$333,935
$351,015
$436,415
$521,815
$590,135
Texas
15-19.99
17.0
$117,884
$135,661
$171,215
$206,769
$242,323
$277,877
$331,208
$366,762
$384,539
$473,424
$562,309
$633,417
Texas
20-29.99
23.0
$145,567
$164,180
$201,406
$238,632
$275,858
$313,084
$368,923
$406,149
$424,762
$517,827
$610,892
$685,344
Texas
30-39.99
34.0
$228,468
$260,971
$325,977
$390,983
$455,989
$520,995
$618,504
$683,510
$716,013
$878,528
$1,041,043
$1,171,055
Texas
40-59.99
46.0
$283,346
$317,034
$384,410
$451,786
$519,162
$586,538
$687,602
$754,978
$788,666
$957,106
$1,125,546
$1,260,298
Texas
60-79.99
69.0
$422,988
$473,614
$574,866
$676,118
$777,370
$878,622
$1,030,500
$1,131,752
$1,182,378
$1,435,508
$1,688,638
$1,891,142
Texas
80-99.99
85.1
$529,212
$594,232
$724,272
$854,312
$984,352
$1,114,392
$1,309,452
$1,439,492
$1,504,512
$1,829,612
$2,154,712
$2,414,792
Texas
100 <
145.0
$878,084
$980,122
$1,184,198
$1,388,274
$1,592,350
$1,796,426
$2,102,540
$2,306,616
$2,408,654
$2,918,844
$3,429,034
$3,837,186
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$22,167
$34,942
$60,492
$86,042
$111,592
$137,142
$175,467
$201,017
$213,792
$277,667
$341,542
$392,642
Utah
15-19.99
17.0
$23,352
$37,312
$65,232
$93,152
$121,072
$148,992
$190,872
$218,792
$232,752
$302,552
$372,352
$428,192
Utah
20-29.99
23.0
$24,714
$40,036
$70,680
$101,324
$131,968
$162,612
$208,578
$239,222
$254,544
$331,154
$407,764
$469,052
Utah
30-39.99
34.0
$41,571
$59,100
$94,158
$129,216
$164,274
$199,332
$251,919
$286,977
$304,506
$392,151
$479,796
$549,912
Utah
40-59.99
46.0
$42,319
$60,596
$97,150
$133,704
$170,258
$206,812
$261,643
$298,197
$316,474
$407,859
$499,244
$572,352
Utah
60-79.99
69.0
$43,753
$63,464
$102,886
$142,308
$181,730
$221,152
$280,285
$319,707
$339,418
$437,973
$536,528
$615,372
Utah
80-99.99
85.1
$44,832
$65,622
$107,202
$148,782
$190,362
$231,942
$294,312
$335,892
$356,682
$460,632
$564,582
$647,742
Utah
100 <
145.0
$88,092
$128,100
$208,116
$288,132
$368,148
$448,164
$568,188
$648,204
$688,212
$888,252
$1,088,292
$1,248,324
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$69,178
$86,335
$120,649
$154,963
$189,277
$223,591
$275,062
$309,376
$326,533
$412,318
$498,103
$566,731
Vermont
15-19.99
17.0
$81,564
$99,449
$135,219
$170,989
$206,759
$242,529
$296,184
$331,954
$349,839
$439,264
$528,689
$600,229
Vermont
20-29.99
23.0
$96,428
$115,187
$152,705
$190,223
$227,741
$265,259
$321,536
$359,054
$377,813
$471,608
$565,403
$640,439
1-210

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$123,752
$144,188
$185,060
$225,932
$266,804
$307,676
$368,984
$409,856
$430,292
$532,472
$634,652
$716,396
Vermont
40-59.99
46.0
$153,479
$175,662
$220,028
$264,394
$308,760
$353,126
$419,675
$464,041
$486,224
$597,139
$708,054
$796,786
Vermont
60-79.99
69.0
$241,111
$277,508
$350,302
$423,096
$495,890
$568,684
$677,875
$750,669
$787,066
$969,051
$1,151,036
$1,296,624
Vermont
80-99.99
85.1
$280,313
$318,373
$394,493
$470,613
$546,733
$622,853
$737,033
$813,153
$851,213
$1,041,513
$1,231,813
$1,384,053
Vermont
100 <
145.0
$499,266
$572,782
$719,814
$866,846
$1,013,878
$1,160,910
$1,381,458
$1,528,490
$1,602,006
$1,969,586
$2,337,166
$2,631,230
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$69,473
$86,956
$121,922
$156,888
$191,854
$226,820
$279,269
$314,235
$331,718
$419,133
$506,548
$576,480
Virginia
15-19.99
17.0
$81,981
$100,328
$137,022
$173,716
$210,410
$247,104
$302,145
$338,839
$357,186
$448,921
$540,656
$614,044
Virginia
20-29.99
23.0
$96,992
$116,376
$155,144
$193,912
$232,680
$271,448
$329,600
$368,368
$387,752
$484,672
$581,592
$659,128
Virginia
30-39.99
34.0
$124,587
$145,947
$188,667
$231,387
$274,107
$316,827
$380,907
$423,627
$444,987
$551,787
$658,587
$744,027
Virginia
40-59.99
46.0
$185,750
$220,533
$290,099
$359,665
$429,231
$498,797
$603,146
$672,712
$707,495
$881,410
$1,055,325
$1,194,457
Virginia
60-79.99
69.0
$242,261
$279,989
$355,445
$430,901
$506,357
$581,813
$694,997
$770,453
$808,181
$996,821
$1,185,461
$1,336,373
Virginia
80-99.99
85.1
$316,731
$371,641
$481,461
$591,281
$701,101
$810,921
$975,651
$1,085,471
$1,140,381
$1,414,931
$1,689,481
$1,909,121
Virginia
100 <
145.0
$501,682
$577,996
$730,624
$883,252
$1,035,880
$1,188,508
$1,417,450
$1,570,078
$1,646,392
$2,027,962
$2,409,532
$2,714,788
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$50,316
$67,065
$100,563
$134,061
$167,559
$201,057
$251,304
$284,802
$301,551
$385,296
$469,041
$536,037
Washington
15-19.99
17.0
$76,266
$94,242
$130,194
$166,146
$202,098
$238,050
$291,978
$327,930
$345,906
$435,786
$525,666
$597,570
Washington
20-29.99
23.0
$89,259
$108,141
$145,905
$183,669
$221,433
$259,197
$315,843
$353,607
$372,489
$466,899
$561,309
$636,837
Washington
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Washington
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Washington
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Washington
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Washington
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-211

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$58,061
$75,671
$110,891
$146,111
$181,331
$216,551
$269,381
$304,601
$322,211
$410,261
$498,311
$568,751
West Virginia
15-19.99
17.0
$65,815
$84,342
$121,396
$158,450
$195,504
$232,558
$288,139
$325,193
$343,720
$436,355
$528,990
$603,098
West Virginia
20-29.99
23.0
$75,119
$94,746
$134,000
$173,254
$212,508
$251,762
$310,643
$349,897
$369,524
$467,659
$565,794
$644,302
West Virginia
30-39.99
34.0
$92,253
$113,973
$157,413
$200,853
$244,293
$287,733
$352,893
$396,333
$418,053
$526,653
$635,253
$722,133
West Virginia
40-59.99
46.0
$110,938
$134,934
$182,926
$230,918
$278,910
$326,902
$398,890
$446,882
$470,878
$590,858
$710,838
$806,822
West Virginia
60-79.99
69.0
$176,430
$214,676
$291,168
$367,660
$444,152
$520,644
$635,382
$711,874
$750,120
$941,350
$1,132,580
$1,285,564
West Virginia
80-99.99
85.1
$200,665
$241,131
$322,063
$402,995
$483,927
$564,859
$686,257
$767,189
$807,655
$1,009,985
$1,212,315
$1,374,179
West Virginia
100 <
145.0
$363,342
$440,744
$595,548
$750,352
$905,156
$1,059,960
$1,292,166
$1,446,970
$1,524,372
$1,911,382
$2,298,392
$2,608,000
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$73,301
$90,327
$124,379
$158,431
$192,483
$226,535
$277,613
$311,665
$328,691
$413,821
$498,951
$567,055
Wisconsin
15-19.99
17.0
$87,406
$105,106
$140,506
$175,906
$211,306
$246,706
$299,806
$335,206
$352,906
$441,406
$529,906
$600,706
Wisconsin
20-29.99
23.0
$104,331
$122,840
$159,858
$196,876
$233,894
$270,912
$326,439
$363,457
$381,966
$474,511
$567,056
$641,092
Wisconsin
30-39.99
34.0
$135,437
$155,504
$195,638
$235,772
$275,906
$316,040
$376,241
$416,375
$436,442
$536,777
$637,112
$717,380
Wisconsin
40-59.99
46.0
$169,287
$190,971
$234,339
$277,707
$321,075
$364,443
$429,495
$472,863
$494,547
$602,967
$711,387
$798,123
Wisconsin
60-79.99
69.0
$265,041
$300,907
$372,639
$444,371
$516,103
$587,835
$695,433
$767,165
$803,031
$982,361
$1,161,691
$1,305,155
Wisconsin
80-99.99
85.1
$309,827
$347,232
$422,042
$496,852
$571,662
$646,472
$758,687
$833,497
$870,902
$1,057,927
$1,244,952
$1,394,572
Wisconsin
100 <
145.0
$549,554
$621,954
$766,754
$911,554
$1,056,354
$1,201,154
$1,418,354
$1,563,154
$1,635,554
$1,997,554
$2,359,554
$2,649,154
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$29,856
$42,664
$68,280
$93,896
$119,512
$145,128
$183,552
$209,168
$221,976
$286,016
$350,056
$401,288
Wyoming
15-19.99
17.0
$34,245
$48,252
$76,266
$104,280
$132,294
$160,308
$202,329
$230,343
$244,350
$314,385
$384,420
$440,448
Wyoming
20-29.99
23.0
$55,502
$72,288
$105,860
$139,432
$173,004
$206,576
$256,934
$290,506
$307,292
$391,222
$475,152
$542,296
Wyoming
30-39.99
34.0
$63,288
$80,843
$115,953
$151,063
$186,173
$221,283
$273,948
$309,058
$326,613
$414,388
$502,163
$572,383
Wyoming
40-59.99
46.0
$71,701
$90,013
$126,637
$163,261
$199,885
$236,509
$291,445
$328,069
$346,381
$437,941
$529,501
$602,749
Wyoming
60-79.99
69.0
$87,827
$107,591
$147,119
$186,647
$226,175
$265,703
$324,995
$364,523
$384,287
$483,107
$581,927
$660,983
Wyoming
80-99.99
85.1
$99,189
$120,044
$161,754
$203,464
$245,174
$286,884
$349,449
$391,159
$412,014
$516,289
$620,564
$703,984
Wyoming
100 <
145.0
$180,710
$220,828
$301,064
$381,300
$461,536
$541,772
$662,126
$742,362
$782,480
$983,070
$1,183,660
$1,344,132
1-212

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$120,881
$138,810
$174,668
$210,526
$246,384
$282,242
$336,029
$371,887
$389,816
$479,461
$569,106
$640,822
Alabama
15-19.99
17.0
$154,810
$173,789
$211,747
$249,705
$287,663
$325,621
$382,558
$420,516
$439,495
$534,390
$629,285
$705,201
Alabama
20-29.99
23.0
$195,601
$215,916
$256,546
$297,176
$337,806
$378,436
$439,381
$480,011
$500,326
$601,901
$703,476
$784,736
Alabama
30-39.99
34.0
$301,621
$335,830
$404,248
$472,666
$541,084
$609,502
$712,129
$780,547
$814,756
$985,801
$1,156,846
$1,293,682
Alabama
40-59.99
46.0
$382,444
$418,566
$490,810
$563,054
$635,298
$707,542
$815,908
$888,152
$924,274
$1,104,884
$1,285,494
$1,429,982
Alabama
60-79.99
69.0
$572,096
$626,833
$736,307
$845,781
$955,255
$1,064,729
$1,228,940
$1,338,414
$1,393,151
$1,666,836
$1,940,521
$2,159,469
Alabama
80-99.99
85.1
$712,538
$782,054
$921,086
$1,060,118
$1,199,150
$1,338,182
$1,546,730
$1,685,762
$1,755,278
$2,102,858
$2,450,438
$2,728,502
Alabama
100 <
145.0
$1,191,406
$1,302,064
$1,523,380
$1,744,696
$1,966,012
$2,187,328
$2,519,302
$2,740,618
$2,851,276
$3,404,566
$3,957,856
$4,400,488
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$50,316
$67,065
$100,563
$134,061
$167,559
$201,057
$251,304
$284,802
$301,551
$385,296
$469,041
$536,037
Alaska
15-19.99
17.0
$76,266
$94,242
$130,194
$166,146
$202,098
$238,050
$291,978
$327,930
$345,906
$435,786
$525,666
$597,570
Alaska
20-29.99
23.0
$89,259
$108,141
$145,905
$183,669
$221,433
$259,197
$315,843
$353,607
$372,489
$466,899
$561,309
$636,837
Alaska
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Alaska
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Alaska
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Alaska
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Alaska
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$20,890
$32,388
$55,384
$78,380
$101,376
$124,372
$158,866
$181,862
$193,360
$250,850
$308,340
$354,332
Arizona
15-19.99
17.0
$21,494
$33,596
$57,800
$82,004
$106,208
$130,412
$166,718
$190,922
$203,024
$263,534
$324,044
$372,452
Arizona
20-29.99
23.0
$22,218
$35,044
$60,696
$86,348
$112,000
$137,652
$176,130
$201,782
$214,608
$278,738
$342,868
$394,172
Arizona
30-39.99
34.0
$40,503
$56,964
$89,886
$122,808
$155,730
$188,652
$238,035
$270,957
$287,418
$369,723
$452,028
$517,872
1-213

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$40,976
$57,910
$91,778
$125,646
$159,514
$193,382
$244,184
$278,052
$294,986
$379,656
$464,326
$532,062
Arizona
60-79.99
69.0
$41,738
$59,434
$94,826
$130,218
$165,610
$201,002
$254,090
$289,482
$307,178
$395,658
$484,138
$554,922
Arizona
80-99.99
85.1
$42,272
$60,502
$96,962
$133,422
$169,882
$206,342
$261,032
$297,492
$315,722
$406,872
$498,022
$570,942
Arizona
100 <
145.0
$83,708
$119,332
$190,580
$261,828
$333,076
$404,324
$511,196
$582,444
$618,068
$796,188
$974,308
$1,116,804
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$101,716
$119,572
$155,284
$190,996
$226,708
$262,420
$315,988
$351,700
$369,556
$458,836
$548,116
$619,540
Arkansas
15-19.99
17.0
$127,660
$146,536
$184,288
$222,040
$259,792
$297,544
$354,172
$391,924
$410,800
$505,180
$599,560
$675,064
Arkansas
20-29.99
23.0
$158,868
$179,043
$219,393
$259,743
$300,093
$340,443
$400,968
$441,318
$461,493
$562,368
$663,243
$743,943
Arkansas
30-39.99
34.0
$247,380
$281,442
$349,566
$417,690
$485,814
$553,938
$656,124
$724,248
$758,310
$928,620
$1,098,930
$1,235,178
Arkansas
40-59.99
46.0
$309,059
$344,982
$416,828
$488,674
$560,520
$632,366
$740,135
$811,981
$847,904
$1,027,519
$1,207,134
$1,350,826
Arkansas
60-79.99
69.0
$461,977
$516,375
$625,171
$733,967
$842,763
$951,559
$1,114,753
$1,223,549
$1,277,947
$1,549,937
$1,821,927
$2,039,519
Arkansas
80-99.99
85.1
$576,549
$645,472
$783,318
$921,164
$1,059,010
$1,196,856
$1,403,625
$1,541,471
$1,610,394
$1,955,009
$2,299,624
$2,575,316
Arkansas
100 <
145.0
$960,000
$1,069,948
$1,289,844
$1,509,740
$1,729,636
$1,949,532
$2,279,376
$2,499,272
$2,609,220
$3,158,960
$3,708,700
$4,148,492
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$26,955
$40,497
$67,581
$94,665
$121,749
$148,833
$189,459
$216,543
$230,085
$297,795
$365,505
$419,673
California
15-19.99
17.0
$46,412
$63,085
$96,431
$129,777
$163,123
$196,469
$246,488
$279,834
$296,507
$379,872
$463,237
$529,929
California
20-29.99
23.0
$48,970
$66,191
$100,633
$135,075
$169,517
$203,959
$255,622
$290,064
$307,285
$393,390
$479,495
$548,379
California
30-39.99
34.0
$53,522
$71,609
$107,783
$143,957
$180,131
$216,305
$270,566
$306,740
$324,827
$415,262
$505,697
$578,045
California
40-59.99
46.0
$58,489
$77,521
$115,585
$153,649
$191,713
$229,777
$286,873
$324,937
$343,969
$439,129
$534,289
$610,417
California
60-79.99
69.0
$68,083
$89,002
$130,840
$172,678
$214,516
$256,354
$319,111
$360,949
$381,868
$486,463
$591,058
$674,734
California
80-99.99
85.1
$106,250
$140,149
$207,947
$275,745
$343,543
$411,341
$513,038
$580,836
$614,735
$784,230
$953,725
$1,089,321
California
100 <
145.0
$139,064
$181,454
$266,234
$351,014
$435,794
$520,574
$647,744
$732,524
$774,914
$986,864
$1,198,814
$1,368,374
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$36,811
$49,352
$74,434
$99,516
$124,598
$149,680
$187,303
$212,385
$224,926
$287,631
$350,336
$400,500
1-214

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$61,421
$77,724
$110,330
$142,936
$175,542
$208,148
$257,057
$289,663
$305,966
$387,481
$468,996
$534,208
Colorado
20-29.99
23.0
$69,202
$85,847
$119,137
$152,427
$185,717
$219,007
$268,942
$302,232
$318,877
$402,102
$485,327
$551,907
Colorado
30-39.99
34.0
$83,542
$100,889
$135,583
$170,277
$204,971
$239,665
$291,706
$326,400
$343,747
$430,482
$517,217
$586,605
Colorado
40-59.99
46.0
$99,103
$117,134
$153,196
$189,258
$225,320
$261,382
$315,475
$351,537
$369,568
$459,723
$549,878
$622,002
Colorado
60-79.99
69.0
$128,930
$148,272
$186,956
$225,640
$264,324
$303,008
$361,034
$399,718
$419,060
$515,770
$612,480
$689,848
Colorado
80-99.99
85.1
$181,924
$214,508
$279,676
$344,844
$410,012
$475,180
$572,932
$638,100
$670,684
$833,604
$996,524
$1,126,860
Colorado
100 <
145.0
$266,936
$306,018
$384,182
$462,346
$540,510
$618,674
$735,920
$814,084
$853,166
$1,048,576
$1,243,986
$1,400,314
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$68,908
$86,600
$121,984
$157,368
$192,752
$228,136
$281,212
$316,596
$334,288
$422,748
$511,208
$581,976
Connecticut
15-19.99
17.0
$81,182
$99,825
$137,111
$174,397
$211,683
$248,969
$304,898
$342,184
$360,827
$454,042
$547,257
$621,829
Connecticut
20-29.99
23.0
$95,910
$115,694
$155,262
$194,830
$234,398
$273,966
$333,318
$372,886
$392,670
$491,590
$590,510
$669,646
Connecticut
30-39.99
34.0
$122,986
$144,937
$188,839
$232,741
$276,643
$320,545
$386,398
$430,300
$452,251
$562,006
$671,761
$759,565
Connecticut
40-59.99
46.0
$183,353
$218,704
$289,406
$360,108
$430,810
$501,512
$607,565
$678,267
$713,618
$890,373
$1,067,128
$1,208,532
Connecticut
60-79.99
69.0
$238,664
$277,243
$354,401
$431,559
$508,717
$585,875
$701,612
$778,770
$817,349
$1,010,244
$1,203,139
$1,357,455
Connecticut
80-99.99
85.1
$312,440
$368,544
$480,752
$592,960
$705,168
$817,376
$985,688
$1,097,896
$1,154,000
$1,434,520
$1,715,040
$1,939,456
Connecticut
100 <
145.0
$494,126
$572,230
$728,438
$884,646
$1,040,854
$1,197,062
$1,431,374
$1,587,582
$1,665,686
$2,056,206
$2,446,726
$2,759,142
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$72,340
$89,960
$125,200
$160,440
$195,680
$230,920
$283,780
$319,020
$336,640
$424,740
$512,840
$583,320
Delaware
15-19.99
17.0
$86,044
$104,585
$141,667
$178,749
$215,831
$252,913
$308,536
$345,618
$364,159
$456,864
$549,569
$623,733
Delaware
20-29.99
23.0
$102,489
$122,136
$161,430
$200,724
$240,018
$279,312
$338,253
$377,547
$397,194
$495,429
$593,664
$672,252
Delaware
30-39.99
34.0
$132,713
$154,462
$197,960
$241,458
$284,956
$328,454
$393,701
$437,199
$458,948
$567,693
$676,438
$763,434
Delaware
40-59.99
46.0
$196,591
$231,747
$302,059
$372,371
$442,683
$512,995
$618,463
$688,775
$723,931
$899,711
$1,075,491
$1,216,115
Delaware
60-79.99
69.0
$258,523
$296,811
$373,387
$449,963
$526,539
$603,115
$717,979
$794,555
$832,843
$1,024,283
$1,215,723
$1,368,875
Delaware
80-99.99
85.1
$336,882
$392,577
$503,967
$615,357
$726,747
$838,137
$1,005,222
$1,116,612
$1,172,307
$1,450,782
$1,729,257
$1,952,037
Delaware
100 <
145.0
$535,856
$613,346
$768,326
$923,306
$1,078,286
$1,233,266
$1,465,736
$1,620,716
$1,698,206
$2,085,656
$2,473,106
$2,783,066
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-215

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$71,217
$88,771
$123,879
$158,987
$194,095
$229,203
$281,865
$316,973
$334,527
$422,297
$510,067
$580,283
District of
Columbia
15-19.99
17.0
$84,453
$102,901
$139,797
$176,693
$213,589
$250,485
$305,829
$342,725
$361,173
$453,413
$545,653
$619,445
District of
Columbia
20-29.99
23.0
$100,336
$119,857
$158,899
$197,941
$236,983
$276,025
$334,588
$373,630
$393,151
$490,756
$588,361
$666,445
District of
Columbia
30-39.99
34.0
$129,530
$151,092
$194,216
$237,340
$280,464
$323,588
$388,274
$431,398
$452,960
$560,770
$668,580
$754,828
District of
Columbia
40-59.99
46.0
$192,358
$227,335
$297,289
$367,243
$437,197
$507,151
$612,082
$682,036
$717,013
$891,898
$1,066,783
$1,206,691
District of
Columbia
60-79.99
69.0
$252,173
$290,192
$366,230
$442,268
$518,306
$594,344
$708,401
$784,439
$822,458
$1,012,553
$1,202,648
$1,354,724
District of
Columbia
80-99.99
85.1
$329,005
$384,323
$494,959
$605,595
$716,231
$826,867
$992,821
$1,103,457
$1,158,775
$1,435,365
$1,711,955
$1,933,227
District of
Columbia
100 <
145.0
$522,512
$599,438
$753,290
$907,142
$1,060,994
$1,214,846
$1,445,624
$1,599,476
$1,676,402
$2,061,032
$2,445,662
$2,753,366
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$119,756
$138,352
$175,544
$212,736
$249,928
$287,120
$342,908
$380,100
$398,696
$491,676
$584,656
$659,040
Florida
15-19.99
17.0
$153,292
$173,291
$213,289
$253,287
$293,285
$333,283
$393,280
$433,278
$453,277
$553,272
$653,267
$733,263
Florida
20-29.99
23.0
$225,121
$258,598
$325,552
$392,506
$459,460
$526,414
$626,845
$693,799
$727,276
$894,661
$1,062,046
$1,195,954
Florida
30-39.99
34.0
$298,010
$333,684
$405,032
$476,380
$547,728
$619,076
$726,098
$797,446
$833,120
$1,011,490
$1,189,860
$1,332,556
Florida
40-59.99
46.0
$411,975
$464,703
$570,159
$675,615
$781,071
$886,527
$1,044,711
$1,150,167
$1,202,895
$1,466,535
$1,730,175
$1,941,087
Florida
60-79.99
69.0
$596,686
$666,523
$806,197
$945,871
$1,085,545
$1,225,219
$1,434,730
$1,574,404
$1,644,241
$1,993,426
$2,342,611
$2,621,959
Florida
80-99.99
85.1
$703,187
$776,058
$921,800
$1,067,542
$1,213,284
$1,359,026
$1,577,639
$1,723,381
$1,796,252
$2,160,607
$2,524,962
$2,816,446
Florida
100 <
145.0
$1,239,676
$1,380,668
$1,662,652
$1,944,636
$2,226,620
$2,508,604
$2,931,580
$3,213,564
$3,354,556
$4,059,516
$4,764,476
$5,328,444
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$99,042
$117,065
$153,111
$189,157
$225,203
$261,249
$315,318
$351,364
$369,387
$459,502
$549,617
$621,709
1-216

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$123,871
$142,983
$181,207
$219,431
$257,655
$295,879
$353,215
$391,439
$410,551
$506,111
$601,671
$678,119
Georgia
20-29.99
23.0
$153,741
$174,235
$215,223
$256,211
$297,199
$338,187
$399,669
$440,657
$461,151
$563,621
$666,091
$748,067
Georgia
30-39.99
34.0
$239,665
$274,062
$342,856
$411,650
$480,444
$549,238
$652,429
$721,223
$755,620
$927,605
$1,099,590
$1,237,178
Georgia
40-59.99
46.0
$298,620
$334,996
$407,748
$480,500
$553,252
$626,004
$735,132
$807,884
$844,260
$1,026,140
$1,208,020
$1,353,524
Georgia
60-79.99
69.0
$446,411
$501,581
$611,921
$722,261
$832,601
$942,941
$1,108,451
$1,218,791
$1,273,961
$1,549,811
$1,825,661
$2,046,341
Georgia
80-99.99
85.1
$525,682
$583,679
$699,673
$815,667
$931,661
$1,047,655
$1,221,646
$1,337,640
$1,395,637
$1,685,622
$1,975,607
$2,207,595
Georgia
100 <
145.0
$927,286
$1,038,854
$1,261,990
$1,485,126
$1,708,262
$1,931,398
$2,266,102
$2,489,238
$2,600,806
$3,158,646
$3,716,486
$4,162,758
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$113,464
$129,738
$162,286
$194,834
$227,382
$259,930
$308,752
$341,300
$357,574
$438,944
$520,314
$585,410
Hawaii
15-19.99
17.0
$144,335
$161,001
$194,333
$227,665
$260,997
$294,329
$344,327
$377,659
$394,325
$477,655
$560,985
$627,649
Hawaii
20-29.99
23.0
$214,331
$244,627
$305,219
$365,811
$426,403
$486,995
$577,883
$638,475
$668,771
$820,251
$971,731
$1,092,915
Hawaii
30-39.99
34.0
$281,995
$312,902
$374,716
$436,530
$498,344
$560,158
$652,879
$714,693
$745,600
$900,135
$1,054,670
$1,178,298
Hawaii
40-59.99
46.0
$389,635
$435,242
$526,456
$617,670
$708,884
$800,098
$936,919
$1,028,133
$1,073,740
$1,301,775
$1,529,810
$1,712,238
Hawaii
60-79.99
69.0
$564,242
$624,462
$744,902
$865,342
$985,782
$1,106,222
$1,286,882
$1,407,322
$1,467,542
$1,768,642
$2,069,742
$2,310,622
Hawaii
80-99.99
85.1
$663,502
$724,842
$847,522
$970,202
$1,092,882
$1,215,562
$1,399,582
$1,522,262
$1,583,602
$1,890,302
$2,197,002
$2,442,362
Hawaii
100 <
145.0
$1,171,542
$1,292,372
$1,534,032
$1,775,692
$2,017,352
$2,259,012
$2,621,502
$2,863,162
$2,983,992
$3,588,142
$4,192,292
$4,675,612
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$21,563
$33,734
$58,076
$82,418
$106,760
$131,102
$167,615
$191,957
$204,128
$264,983
$325,838
$374,522
Idaho
15-19.99
17.0
$22,447
$35,502
$61,612
$87,722
$113,832
$139,942
$179,107
$205,217
$218,272
$283,547
$348,822
$401,042
Idaho
20-29.99
23.0
$23,558
$37,724
$66,056
$94,388
$122,720
$151,052
$193,550
$221,882
$236,048
$306,878
$377,708
$434,372
Idaho
30-39.99
34.0
$25,552
$41,712
$74,032
$106,352
$138,672
$170,992
$219,472
$251,792
$267,952
$348,752
$429,552
$494,192
Idaho
40-59.99
46.0
$41,684
$59,326
$94,610
$129,894
$165,178
$200,462
$253,388
$288,672
$306,314
$394,524
$482,734
$553,302
Idaho
60-79.99
69.0
$42,801
$61,560
$99,078
$136,596
$174,114
$211,632
$267,909
$305,427
$324,186
$417,981
$511,776
$586,812
Idaho
80-99.99
85.1
$43,582
$63,122
$102,202
$141,282
$180,362
$219,442
$278,062
$317,142
$336,682
$434,382
$532,082
$610,242
Idaho
100 <
145.0
$85,940
$123,796
$199,508
$275,220
$350,932
$426,644
$540,212
$615,924
$653,780
$843,060
$1,032,340
$1,183,764
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-217

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$64,756
$81,863
$116,077
$150,291
$184,505
$218,719
$270,040
$304,254
$321,361
$406,896
$492,431
$560,859
Illinois
15-19.99
17.0
$75,300
$93,115
$128,745
$164,375
$200,005
$235,635
$289,080
$324,710
$342,525
$431,600
$520,675
$591,935
Illinois
20-29.99
23.0
$87,952
$106,616
$143,944
$181,272
$218,600
$255,928
$311,920
$349,248
$367,912
$461,232
$554,552
$629,208
Illinois
30-39.99
34.0
$111,224
$131,520
$172,112
$212,704
$253,296
$293,888
$354,776
$395,368
$415,664
$517,144
$618,624
$699,808
Illinois
40-59.99
46.0
$168,087
$201,848
$269,370
$336,892
$404,414
$471,936
$573,219
$640,741
$674,502
$843,307
$1,012,112
$1,147,156
Illinois
60-79.99
69.0
$215,769
$251,965
$324,357
$396,749
$469,141
$541,533
$650,121
$722,513
$758,709
$939,689
$1,120,669
$1,265,453
Illinois
80-99.99
85.1
$249,057
$286,869
$362,493
$438,117
$513,741
$589,365
$702,801
$778,425
$816,237
$1,005,297
$1,194,357
$1,345,605
Illinois
100 <
145.0
$446,010
$519,104
$665,292
$811,480
$957,668
$1,103,856
$1,323,138
$1,469,326
$1,542,420
$1,907,890
$2,273,360
$2,565,736
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$82,280
$99,729
$134,627
$169,525
$204,423
$239,321
$291,668
$326,566
$344,015
$431,260
$518,505
$588,301
Indiana
15-19.99
17.0
$100,124
$118,422
$155,018
$191,614
$228,210
$264,806
$319,700
$356,296
$374,594
$466,084
$557,574
$630,766
Indiana
20-29.99
23.0
$121,539
$140,857
$179,493
$218,129
$256,765
$295,401
$353,355
$391,991
$411,309
$507,899
$604,489
$681,761
Indiana
30-39.99
34.0
$160,873
$182,136
$224,662
$267,188
$309,714
$352,240
$416,029
$458,555
$479,818
$586,133
$692,448
$777,500
Indiana
40-59.99
46.0
$234,881
$269,571
$338,951
$408,331
$477,711
$547,091
$651,161
$720,541
$755,231
$928,681
$1,102,131
$1,240,891
Indiana
60-79.99
69.0
$315,958
$353,546
$428,722
$503,898
$579,074
$654,250
$767,014
$842,190
$879,778
$1,067,718
$1,255,658
$1,406,010
Indiana
80-99.99
85.1
$407,601
$462,315
$571,743
$681,171
$790,599
$900,027
$1,064,169
$1,173,597
$1,228,311
$1,501,881
$1,775,451
$1,994,307
Indiana
100 <
145.0
$656,554
$732,574
$884,614
$1,036,654
$1,188,694
$1,340,734
$1,568,794
$1,720,834
$1,796,854
$2,176,954
$2,557,054
$2,861,134
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$72,143
$89,179
$123,251
$157,323
$191,395
$225,467
$276,575
$310,647
$327,683
$412,863
$498,043
$566,187
Iowa
15-19.99
17.0
$85,765
$103,479
$138,907
$174,335
$209,763
$245,191
$298,333
$333,761
$351,475
$440,045
$528,615
$599,471
Iowa
20-29.99
23.0
$102,112
$120,640
$157,696
$194,752
$231,808
$268,864
$324,448
$361,504
$380,032
$472,672
$565,312
$639,424
Iowa
30-39.99
34.0
$132,155
$152,250
$192,440
$232,630
$272,820
$313,010
$373,295
$413,485
$433,580
$534,055
$634,530
$714,910
Iowa
40-59.99
46.0
$196,485
$230,053
$297,189
$364,325
$431,461
$498,597
$599,301
$666,437
$700,005
$867,845
$1,035,685
$1,169,957
Iowa
60-79.99
69.0
$258,365
$294,271
$366,083
$437,895
$509,707
$581,519
$689,237
$761,049
$796,955
$976,485
$1,156,015
$1,299,639
Iowa
80-99.99
85.1
$336,112
$388,294
$492,658
$597,022
$701,386
$805,750
$962,296
$1,066,660
$1,118,842
$1,379,752
$1,640,662
$1,849,390
1-218

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$535,526
$608,012
$752,984
$897,956
$1,042,928
$1,187,900
$1,405,358
$1,550,330
$1,622,816
$1,985,246
$2,347,676
$2,637,620
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$78,723
$96,017
$130,605
$165,193
$199,781
$234,369
$286,251
$320,839
$338,133
$424,603
$511,073
$580,249
Kansas
15-19.99
17.0
$95,087
$113,167
$149,327
$185,487
$221,647
$257,807
$312,047
$348,207
$366,287
$456,687
$547,087
$619,407
Kansas
20-29.99
23.0
$114,724
$133,747
$171,793
$209,839
$247,885
$285,931
$343,000
$381,046
$400,069
$495,184
$590,299
$666,391
Kansas
30-39.99
34.0
$150,798
$171,624
$213,276
$254,928
$296,580
$338,232
$400,710
$442,362
$463,188
$567,318
$671,448
$754,752
Kansas
40-59.99
46.0
$221,421
$255,691
$324,231
$392,771
$461,311
$529,851
$632,661
$701,201
$735,471
$906,821
$1,078,171
$1,215,251
Kansas
60-79.99
69.0
$295,769
$332,728
$406,646
$480,564
$554,482
$628,400
$739,277
$813,195
$850,154
$1,034,949
$1,219,744
$1,367,580
Kansas
80-99.99
85.1
$382,596
$436,429
$544,095
$651,761
$759,427
$867,093
$1,028,592
$1,136,258
$1,190,091
$1,459,256
$1,728,421
$1,943,753
Kansas
100 <
145.0
$683,138
$787,262
$995,510
$1,203,758
$1,412,006
$1,620,254
$1,932,626
$2,140,874
$2,244,998
$2,765,618
$3,286,238
$3,702,734
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$68,630
$86,352
$121,796
$157,240
$192,684
$228,128
$281,294
$316,738
$334,460
$423,070
$511,680
$582,568
Kentucky
15-19.99
17.0
$80,789
$99,475
$136,847
$174,219
$211,591
$248,963
$305,021
$342,393
$361,079
$454,509
$547,939
$622,683
Kentucky
20-29.99
23.0
$95,379
$115,222
$154,908
$194,594
$234,280
$273,966
$333,495
$373,181
$393,024
$492,239
$591,454
$670,826
Kentucky
30-39.99
34.0
$122,202
$144,241
$188,319
$232,397
$276,475
$320,553
$386,670
$430,748
$452,787
$562,982
$673,177
$761,333
Kentucky
40-59.99
46.0
$182,256
$217,690
$288,558
$359,426
$430,294
$501,162
$607,464
$678,332
$713,766
$890,936
$1,068,106
$1,209,842
Kentucky
60-79.99
69.0
$237,020
$275,725
$353,135
$430,545
$507,955
$585,365
$701,480
$778,890
$817,595
$1,011,120
$1,204,645
$1,359,465
Kentucky
80-99.99
85.1
$310,433
$366,713
$479,273
$591,833
$704,393
$816,953
$985,793
$1,098,353
$1,154,633
$1,436,033
$1,717,433
$1,942,553
Kentucky
100 <
145.0
$490,670
$569,038
$725,774
$882,510
$1,039,246
$1,195,982
$1,431,086
$1,587,822
$1,666,190
$2,058,030
$2,449,870
$2,763,342
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$137,483
$155,913
$192,773
$229,633
$266,493
$303,353
$358,643
$395,503
$413,933
$506,083
$598,233
$671,953
Louisiana
15-19.99
17.0
$178,329
$198,017
$237,393
$276,769
$316,145
$355,521
$414,585
$453,961
$473,649
$572,089
$670,529
$749,281
Louisiana
20-29.99
23.0
$259,188
$292,438
$358,938
$425,438
$491,938
$558,438
$658,188
$724,688
$757,938
$924,188
$1,090,438
$1,223,438
Louisiana
30-39.99
34.0
$348,247
$383,462
$453,892
$524,322
$594,752
$665,182
$770,827
$841,257
$876,472
$1,052,547
$1,228,622
$1,369,482
1-219

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$480,047
$532,260
$636,686
$741,112
$845,538
$949,964
$1,106,603
$1,211,029
$1,263,242
$1,524,307
$1,785,372
$1,994,224
Louisiana
60-79.99
69.0
$698,664
$767,597
$905,463
$1,043,329
$1,181,195
$1,319,061
$1,525,860
$1,663,726
$1,732,659
$2,077,324
$2,421,989
$2,697,721
Louisiana
80-99.99
85.1
$863,783
$950,570
$1,124,144
$1,297,718
$1,471,292
$1,644,866
$1,905,227
$2,078,801
$2,165,588
$2,599,523
$3,033,458
$3,380,606
Louisiana
100 <
145.0
$1,454,450
$1,594,016
$1,873,148
$2,152,280
$2,431,412
$2,710,544
$3,129,242
$3,408,374
$3,547,940
$4,245,770
$4,943,600
$5,501,864
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$66,406
$83,956
$119,056
$154,156
$189,256
$224,356
$277,006
$312,106
$329,656
$417,406
$505,156
$575,356
Maine
15-19.99
17.0
$77,639
$96,082
$132,968
$169,854
$206,740
$243,626
$298,955
$335,841
$354,284
$446,499
$538,714
$612,486
Maine
20-29.99
23.0
$91,116
$110,629
$149,655
$188,681
$227,707
$266,733
$325,272
$364,298
$383,811
$481,376
$578,941
$656,993
Maine
30-39.99
34.0
$115,900
$137,451
$180,553
$223,655
$266,757
$309,859
$374,512
$417,614
$439,165
$546,920
$654,675
$740,879
Maine
40-59.99
46.0
$173,921
$208,887
$278,819
$348,751
$418,683
$488,615
$593,513
$663,445
$698,411
$873,241
$1,048,071
$1,187,935
Maine
60-79.99
69.0
$224,519
$262,522
$338,528
$414,534
$490,540
$566,546
$680,555
$756,561
$794,564
$984,579
$1,174,594
$1,326,606
Maine
80-99.99
85.1
$259,975
$300,141
$380,473
$460,805
$541,137
$621,469
$741,967
$822,299
$862,465
$1,063,295
$1,264,125
$1,424,789
Maine
100 <
145.0
$464,400
$541,292
$695,076
$848,860
$1,002,644
$1,156,428
$1,387,104
$1,540,888
$1,617,780
$2,002,240
$2,386,700
$2,694,268
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$71,245
$88,827
$123,991
$159,155
$194,319
$229,483
$282,229
$317,393
$334,975
$422,885
$510,795
$581,123
Maryland
15-19.99
17.0
$84,493
$102,981
$139,957
$176,933
$213,909
$250,885
$306,349
$343,325
$361,813
$454,253
$546,693
$620,645
Maryland
20-29.99
23.0
$100,389
$119,963
$159,111
$198,259
$237,407
$276,555
$335,277
$374,425
$393,999
$491,869
$589,739
$668,035
Maryland
30-39.99
34.0
$129,609
$151,250
$194,532
$237,814
$281,096
$324,378
$389,301
$432,583
$454,224
$562,429
$670,634
$757,198
Maryland
40-59.99
46.0
$192,434
$227,487
$297,593
$367,699
$437,805
$507,911
$613,070
$683,176
$718,229
$893,494
$1,068,759
$1,208,971
Maryland
60-79.99
69.0
$252,287
$290,420
$366,686
$442,952
$519,218
$595,484
$709,883
$786,149
$824,282
$1,014,947
$1,205,612
$1,358,144
Maryland
80-99.99
85.1
$329,165
$384,643
$495,599
$606,555
$717,511
$828,467
$994,901
$1,105,857
$1,161,335
$1,438,725
$1,716,115
$1,938,027
Maryland
100 <
145.0
$522,750
$599,914
$754,242
$908,570
$1,062,898
$1,217,226
$1,448,718
$1,603,046
$1,680,210
$2,066,030
$2,451,850
$2,760,506
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$68,283
$85,871
$121,047
$156,223
$191,399
$226,575
$279,339
$314,515
$332,103
$420,043
$507,983
$578,335
1-220

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$80,297
$98,793
$135,785
$172,777
$209,769
$246,761
$302,249
$339,241
$357,737
$450,217
$542,697
$616,681
Massachusetts
20-29.99
23.0
$94,713
$114,299
$153,471
$192,643
$231,815
$270,987
$329,745
$368,917
$388,503
$486,433
$584,363
$662,707
Massachusetts
30-39.99
34.0
$121,219
$142,878
$186,196
$229,514
$272,832
$316,150
$381,127
$424,445
$446,104
$554,399
$662,694
$749,330
Massachusetts
40-59.99
46.0
$181,075
$216,145
$286,285
$356,425
$426,565
$496,705
$601,915
$672,055
$707,125
$882,475
$1,057,825
$1,198,105
Massachusetts
60-79.99
69.0
$235,248
$273,406
$349,722
$426,038
$502,354
$578,670
$693,144
$769,460
$807,618
$998,408
$1,189,198
$1,341,830
Massachusetts
80-99.99
85.1
$308,155
$363,668
$474,694
$585,720
$696,746
$807,772
$974,311
$1,085,337
$1,140,850
$1,418,415
$1,695,980
$1,918,032
Massachusetts
100 <
145.0
$486,946
$564,164
$718,600
$873,036
$1,027,472
$1,181,908
$1,413,562
$1,567,998
$1,645,216
$2,031,306
$2,417,396
$2,726,268
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$32,550
$48,368
$80,004
$111,640
$143,276
$174,912
$222,366
$254,002
$269,820
$348,910
$428,000
$491,272
Michigan
15-19.99
17.0
$52,054
$69,668
$104,896
$140,124
$175,352
$210,580
$263,422
$298,650
$316,264
$404,334
$492,404
$562,860
Michigan
20-29.99
23.0
$56,503
$74,895
$111,679
$148,463
$185,247
$222,031
$277,207
$313,991
$332,383
$424,343
$516,303
$589,871
Michigan
30-39.99
34.0
$64,658
$84,477
$124,115
$163,753
$203,391
$243,029
$302,486
$342,124
$361,943
$461,038
$560,133
$639,409
Michigan
40-59.99
46.0
$73,629
$95,079
$137,979
$180,879
$223,779
$266,679
$331,029
$373,929
$395,379
$502,629
$609,879
$695,679
Michigan
60-79.99
69.0
$121,657
$157,274
$228,508
$299,742
$370,976
$442,210
$549,061
$620,295
$655,912
$833,997
$1,012,082
$1,154,550
Michigan
80-99.99
85.1
$132,986
$170,084
$244,280
$318,476
$392,672
$466,868
$578,162
$652,358
$689,456
$874,946
$1,060,436
$1,208,828
Michigan
100 <
145.0
$248,238
$320,116
$463,872
$607,628
$751,384
$895,140
$1,110,774
$1,254,530
$1,326,408
$1,685,798
$2,045,188
$2,332,700
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$61,746
$78,558
$112,182
$145,806
$179,430
$213,054
$263,490
$297,114
$313,926
$397,986
$482,046
$549,294
Minnesota
15-19.99
17.0
$71,142
$88,645
$123,651
$158,657
$193,663
$228,669
$281,178
$316,184
$333,687
$421,202
$508,717
$578,729
Minnesota
20-29.99
23.0
$82,326
$100,568
$137,052
$173,536
$210,020
$246,504
$301,230
$337,714
$355,956
$447,166
$538,376
$611,344
Minnesota
30-39.99
34.0
$102,831
$122,427
$161,619
$200,811
$240,003
$279,195
$337,983
$377,175
$396,771
$494,751
$592,731
$671,115
Minnesota
40-59.99
46.0
$125,276
$146,425
$188,723
$231,021
$273,319
$315,617
$379,064
$421,362
$442,511
$548,256
$654,001
$738,597
Minnesota
60-79.99
69.0
$199,133
$234,305
$304,649
$374,993
$445,337
$515,681
$621,197
$691,541
$726,713
$902,573
$1,078,433
$1,219,121
Minnesota
80-99.99
85.1
$228,694
$265,397
$338,803
$412,209
$485,615
$559,021
$669,130
$742,536
$779,239
$962,754
$1,146,269
$1,293,081
Minnesota
100 <
145.0
$411,312
$482,516
$624,924
$767,332
$909,740
$1,052,148
$1,265,760
$1,408,168
$1,479,372
$1,835,392
$2,191,412
$2,476,228
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-221

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$109,606
$127,712
$163,924
$200,136
$236,348
$272,560
$326,878
$363,090
$381,196
$471,726
$562,256
$634,680
Mississippi
15-19.99
17.0
$138,837
$158,067
$196,527
$234,987
$273,447
$311,907
$369,597
$408,057
$427,287
$523,437
$619,587
$696,507
Mississippi
20-29.99
23.0
$173,989
$194,642
$235,948
$277,254
$318,560
$359,866
$421,825
$463,131
$483,784
$587,049
$690,314
$772,926
Mississippi
30-39.99
34.0
$269,529
$304,093
$373,221
$442,349
$511,477
$580,605
$684,297
$753,425
$787,989
$960,809
$1,133,629
$1,271,885
Mississippi
40-59.99
46.0
$339,026
$375,629
$448,835
$522,041
$595,247
$668,453
$778,262
$851,468
$888,071
$1,071,086
$1,254,101
$1,400,513
Mississippi
60-79.99
69.0
$507,065
$562,621
$673,733
$784,845
$895,957
$1,007,069
$1,173,737
$1,284,849
$1,340,405
$1,618,185
$1,895,965
$2,118,189
Mississippi
80-99.99
85.1
$632,212
$702,617
$843,427
$984,237
$1,125,047
$1,265,857
$1,477,072
$1,617,882
$1,688,287
$2,040,312
$2,392,337
$2,673,957
Mississippi
100 <
145.0
$1,118,294
$1,254,636
$1,527,320
$1,800,004
$2,072,688
$2,345,372
$2,754,398
$3,027,082
$3,163,424
$3,845,134
$4,526,844
$5,072,212
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$80,597
$97,894
$132,488
$167,082
$201,676
$236,270
$288,161
$322,755
$340,052
$426,537
$513,022
$582,210
Missour

15-19.99
17.0
$97,740
$115,823
$151,989
$188,155
$224,321
$260,487
$314,736
$350,902
$368,985
$459,400
$549,815
$622,147
Missour

20-29.99
23.0
$118,313
$137,340
$175,394
$213,448
$251,502
$289,556
$346,637
$384,691
$403,718
$498,853
$593,988
$670,096
Missour

30-39.99
34.0
$188,001
$220,938
$286,812
$352,686
$418,560
$484,434
$583,245
$649,119
$682,056
$846,741
$1,011,426
$1,143,174
Missour

40-59.99
46.0
$228,598
$262,874
$331,426
$399,978
$468,530
$537,082
$639,910
$708,462
$742,738
$914,118
$1,085,498
$1,222,602
Missour

60-79.99
69.0
$340,986
$392,614
$495,870
$599,126
$702,382
$805,638
$960,522
$1,063,778
$1,115,406
$1,373,546
$1,631,686
$1,838,198
Missour

80-99.99
85.1
$395,873
$449,718
$557,408
$665,098
$772,788
$880,478
$1,042,013
$1,149,703
$1,203,548
$1,472,773
$1,741,998
$1,957,378
Missour

100 <
145.0
$705,760
$809,904
$1,018,192
$1,226,480
$1,434,768
$1,643,056
$1,955,488
$2,163,776
$2,267,920
$2,788,640
$3,309,360
$3,725,936
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$22,815
$35,070
$59,580
$84,090
$108,600
$133,110
$169,875
$194,385
$206,640
$267,915
$329,190
$378,210
Montana
15-19.99
17.0
$24,220
$37,393
$63,739
$90,085
$116,431
$142,777
$182,296
$208,642
$221,815
$287,680
$353,545
$406,237
Montana
20-29.99
23.0
$25,956
$40,281
$68,931
$97,581
$126,231
$154,881
$197,856
$226,506
$240,831
$312,456
$384,081
$441,381
Montana
30-39.99
34.0
$44,476
$61,600
$95,848
$130,096
$164,344
$198,592
$249,964
$284,212
$301,336
$386,956
$472,576
$541,072
Montana
40-59.99
46.0
$46,250
$63,980
$99,440
$134,900
$170,360
$205,820
$259,010
$294,470
$312,200
$400,850
$489,500
$560,420
Montana
60-79.99
69.0
$49,649
$68,539
$106,319
$144,099
$181,879
$219,659
$276,329
$314,109
$332,999
$427,449
$521,899
$597,459
Montana
80-99.99
85.1
$52,028
$71,730
$111,134
$150,538
$189,942
$229,346
$288,452
$327,856
$347,558
$446,068
$544,578
$623,386
1-222

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$100,332
$138,466
$214,734
$291,002
$367,270
$443,538
$557,940
$634,208
$672,342
$863,012
$1,053,682
$1,206,218
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$71,454
$88,243
$121,821
$155,399
$188,977
$222,555
$272,922
$306,500
$323,289
$407,234
$491,179
$558,335
Nebraska
15-19.99
17.0
$84,896
$102,367
$137,309
$172,251
$207,193
$242,135
$294,548
$329,490
$346,961
$434,316
$521,671
$591,555
Nebraska
20-29.99
23.0
$100,934
$119,132
$155,528
$191,924
$228,320
$264,716
$319,310
$355,706
$373,904
$464,894
$555,884
$628,676
Nebraska
30-39.99
34.0
$130,340
$149,872
$188,936
$228,000
$267,064
$306,128
$364,724
$403,788
$423,320
$520,980
$618,640
$696,768
Nebraska
40-59.99
46.0
$162,493
$183,555
$225,679
$267,803
$309,927
$352,051
$415,237
$457,361
$478,423
$583,733
$689,043
$773,291
Nebraska
60-79.99
69.0
$254,996
$290,075
$360,233
$430,391
$500,549
$570,707
$675,944
$746,102
$781,181
$956,576
$1,131,971
$1,272,287
Nebraska
80-99.99
85.1
$297,593
$334,182
$407,360
$480,538
$553,716
$626,894
$736,661
$809,839
$846,428
$1,029,373
$1,212,318
$1,358,674
Nebraska
100 <
145.0
$528,458
$599,218
$740,738
$882,258
$1,023,778
$1,165,298
$1,377,578
$1,519,098
$1,589,858
$1,943,658
$2,297,458
$2,580,498
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$20,107
$30,822
$52,252
$73,682
$95,112
$116,542
$148,687
$170,117
$180,832
$234,407
$287,982
$330,842
Nevada
15-19.99
17.0
$20,404
$31,416
$53,440
$75,464
$97,488
$119,512
$152,548
$174,572
$185,584
$240,644
$295,704
$339,752
Nevada
20-29.99
23.0
$20,812
$32,232
$55,072
$77,912
$100,752
$123,592
$157,852
$180,692
$192,112
$249,212
$306,312
$351,992
Nevada
30-39.99
34.0
$21,467
$33,542
$57,692
$81,842
$105,992
$130,142
$166,367
$190,517
$202,592
$262,967
$323,342
$371,642
Nevada
40-59.99
46.0
$40,128
$56,214
$88,386
$120,558
$152,730
$184,902
$233,160
$265,332
$281,418
$361,848
$442,278
$506,622
Nevada
60-79.99
69.0
$40,505
$56,968
$89,894
$122,820
$155,746
$188,672
$238,061
$270,987
$287,450
$369,765
$452,080
$517,932
Nevada
80-99.99
85.1
$40,768
$57,494
$90,946
$124,398
$157,850
$191,302
$241,480
$274,932
$291,658
$375,288
$458,918
$525,822
Nevada
100 <
145.0
$81,124
$114,164
$180,244
$246,324
$312,404
$378,484
$477,604
$543,684
$576,724
$741,924
$907,124
$1,039,284
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$60,965
$78,441
$113,393
$148,345
$183,297
$218,249
$270,677
$305,629
$323,105
$410,485
$497,865
$567,769
1-223

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$69,930
$88,268
$124,944
$161,620
$198,296
$234,972
$289,986
$326,662
$345,000
$436,690
$528,380
$601,732
New
Hampshire
20-29.99
23.0
$80,688
$100,060
$138,804
$177,548
$216,292
$255,036
$313,152
$351,896
$371,268
$468,128
$564,988
$642,476
New
Hampshire
30-39.99
34.0
$100,485
$121,827
$164,511
$207,195
$249,879
$292,563
$356,589
$399,273
$420,615
$527,325
$634,035
$719,403
New
Hampshire
40-59.99
46.0
$122,074
$145,558
$192,526
$239,494
$286,462
$333,430
$403,882
$450,850
$474,334
$591,754
$709,174
$803,110
New
Hampshire
60-79.99
69.0
$193,358
$231,060
$306,464
$381,868
$457,272
$532,676
$645,782
$721,186
$758,888
$947,398
$1,135,908
$1,286,716
New
Hampshire
80-99.99
85.1
$221,418
$261,088
$340,428
$419,768
$499,108
$578,448
$697,458
$776,798
$816,468
$1,014,818
$1,213,168
$1,371,848
New
Hampshire
100 <
145.0
$398,914
$475,172
$627,688
$780,204
$932,720
$1,085,236
$1,314,010
$1,466,526
$1,542,784
$1,924,074
$2,305,364
$2,610,396
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$89,900
$107,724
$143,372
$179,020
$214,668
$250,316
$303,788
$339,436
$357,260
$446,380
$535,500
$606,796
New Jersey
15-19.99
17.0
$110,922
$129,753
$167,415
$205,077
$242,739
$280,401
$336,894
$374,556
$393,387
$487,542
$581,697
$657,021
New Jersey
20-29.99
23.0
$136,221
$156,334
$196,560
$236,786
$277,012
$317,238
$377,577
$417,803
$437,916
$538,481
$639,046
$719,498
New Jersey
30-39.99
34.0
$182,466
$204,793
$249,447
$294,101
$338,755
$383,409
$450,390
$495,044
$517,371
$629,006
$740,641
$829,949
New Jersey
40-59.99
46.0
$263,801
$299,637
$371,309
$442,981
$514,653
$586,325
$693,833
$765,505
$801,341
$980,521
$1,159,701
$1,303,045
New Jersey
60-79.99
69.0
$359,152
$398,273
$476,515
$554,757
$632,999
$711,241
$828,604
$906,846
$945,967
$1,141,572
$1,337,177
$1,493,661
New Jersey
80-99.99
85.1
$461,131
$517,993
$631,717
$745,441
$859,165
$972,889
$1,143,475
$1,257,199
$1,314,061
$1,598,371
$1,882,681
$2,110,129
New Jersey
100 <
145.0
$747,322
$826,562
$985,042
$1,143,522
$1,302,002
$1,460,482
$1,698,202
$1,856,682
$1,935,922
$2,332,122
$2,728,322
$3,045,282
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$22,335
$35,278
$61,164
$87,050
$112,936
$138,822
$177,651
$203,537
$216,480
$281,195
$345,910
$397,682
New Mexico
15-19.99
17.0
$23,590
$37,788
$66,184
$94,580
$122,976
$151,372
$193,966
$222,362
$236,560
$307,550
$378,540
$435,332
New Mexico
20-29.99
23.0
$40,974
$57,906
$91,770
$125,634
$159,498
$193,362
$244,158
$278,022
$294,954
$379,614
$464,274
$532,002
New Mexico
30-39.99
34.0
$41,702
$59,362
$94,682
$130,002
$165,322
$200,642
$253,622
$288,942
$306,602
$394,902
$483,202
$553,842
New Mexico
40-59.99
46.0
$42,496
$60,950
$97,858
$134,766
$171,674
$208,582
$263,944
$300,852
$319,306
$411,576
$503,846
$577,662
New Mexico
60-79.99
69.0
$44,094
$64,146
$104,250
$144,354
$184,458
$224,562
$284,718
$324,822
$344,874
$445,134
$545,394
$625,602
1-224

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$45,160
$66,278
$108,514
$150,750
$192,986
$235,222
$298,576
$340,812
$361,930
$467,520
$573,110
$657,582
New Mexico
100 <
145.0
$88,650
$129,216
$210,348
$291,480
$372,612
$453,744
$575,442
$656,574
$697,140
$899,970
$1,102,800
$1,265,064
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$66,415
$83,721
$118,333
$152,945
$187,557
$222,169
$274,087
$308,699
$326,005
$412,535
$499,065
$568,289
New York
15-19.99
17.0
$77,649
$95,745
$131,937
$168,129
$204,321
$240,513
$294,801
$330,993
$349,089
$439,569
$530,049
$602,433
New York
20-29.99
23.0
$91,132
$110,177
$148,267
$186,357
$224,447
$262,537
$319,672
$357,762
$376,807
$472,032
$567,257
$643,437
New York
30-39.99
34.0
$115,924
$136,783
$178,501
$220,219
$261,937
$303,655
$366,232
$407,950
$428,809
$533,104
$637,399
$720,835
New York
40-59.99
46.0
$174,226
$208,528
$277,132
$345,736
$414,340
$482,944
$585,850
$654,454
$688,756
$860,266
$1,031,776
$1,168,984
New York
60-79.99
69.0
$224,974
$261,980
$335,992
$410,004
$484,016
$558,028
$669,046
$743,058
$780,064
$965,094
$1,150,124
$1,298,148
New York
80-99.99
85.1
$260,412
$299,224
$376,848
$454,472
$532,096
$609,720
$726,156
$803,780
$842,592
$1,036,652
$1,230,712
$1,385,960
New York
100 <
145.0
$465,354
$540,150
$689,742
$839,334
$988,926
$1,138,518
$1,362,906
$1,512,498
$1,587,294
$1,961,274
$2,335,254
$2,634,438
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$89,689
$107,318
$142,576
$177,834
$213,092
$248,350
$301,237
$336,495
$354,124
$442,269
$530,414
$600,930
North Carolina
15-19.99
17.0
$110,622
$129,176
$166,284
$203,392
$240,500
$277,608
$333,270
$370,378
$388,932
$481,702
$574,472
$648,688
North Carolina
20-29.99
23.0
$135,740
$155,403
$194,729
$234,055
$273,381
$312,707
$371,696
$411,022
$430,685
$529,000
$627,315
$705,967
North Carolina
30-39.99
34.0
$181,867
$203,640
$247,186
$290,732
$334,278
$377,824
$443,143
$486,689
$508,462
$617,327
$726,192
$813,284
North Carolina
40-59.99
46.0
$263,084
$298,263
$368,621
$438,979
$509,337
$579,695
$685,232
$755,590
$790,769
$966,664
$1,142,559
$1,283,275
North Carolina
60-79.99
69.0
$358,262
$396,584
$473,228
$549,872
$626,516
$703,160
$818,126
$894,770
$933,092
$1,124,702
$1,316,312
$1,469,600
North Carolina
80-99.99
85.1
$459,901
$515,645
$627,133
$738,621
$850,109
$961,597
$1,128,829
$1,240,317
$1,296,061
$1,574,781
$1,853,501
$2,076,477
North Carolina
100 <
145.0
$745,456
$823,020
$978,148
$1,133,276
$1,288,404
$1,443,532
$1,676,224
$1,831,352
$1,908,916
$2,296,736
$2,684,556
$2,994,812
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$22,453
$35,514
$61,636
$87,758
$113,880
$140,002
$179,185
$205,307
$218,368
$283,673
$348,978
$401,222
North Dakota
15-19.99
17.0
$23,757
$38,122
$66,852
$95,582
$124,312
$153,042
$196,137
$224,867
$239,232
$311,057
$382,882
$440,342
North Dakota
20-29.99
23.0
$41,036
$58,030
$92,018
$126,006
$159,994
$193,982
$244,964
$278,952
$295,946
$380,916
$465,886
$533,862
1-225

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$41,793
$59,544
$95,046
$130,548
$166,050
$201,552
$254,805
$290,307
$308,058
$396,813
$485,568
$556,572
North Dakota
40-59.99
46.0
$42,620
$61,198
$98,354
$135,510
$172,666
$209,822
$265,556
$302,712
$321,290
$414,180
$507,070
$581,382
North Dakota
60-79.99
69.0
$44,280
$64,518
$104,994
$145,470
$185,946
$226,422
$287,136
$327,612
$347,850
$449,040
$550,230
$631,182
North Dakota
80-99.99
85.1
$45,389
$66,736
$109,430
$152,124
$194,818
$237,512
$301,553
$344,247
$365,594
$472,329
$579,064
$664,452
North Dakota
100 <
145.0
$89,042
$130,000
$211,916
$293,832
$375,748
$457,664
$580,538
$662,454
$703,412
$908,202
$1,112,992
$1,276,824
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$76,602
$93,953
$128,655
$163,357
$198,059
$232,761
$284,814
$319,516
$336,867
$423,622
$510,377
$579,781
Ohio
15-19.99
17.0
$92,081
$110,241
$146,561
$182,881
$219,201
$255,521
$310,001
$346,321
$364,481
$455,281
$546,081
$618,721
Ohio
20-29.99
23.0
$110,657
$129,788
$168,050
$206,312
$244,574
$282,836
$340,229
$378,491
$397,622
$493,277
$588,932
$665,456
Ohio
30-39.99
34.0
$144,787
$165,774
$207,748
$249,722
$291,696
$333,670
$396,631
$438,605
$459,592
$564,527
$669,462
$753,410
Ohio
40-59.99
46.0
$182,013
$205,017
$251,025
$297,033
$343,041
$389,049
$458,061
$504,069
$527,073
$642,093
$757,113
$849,129
Ohio
60-79.99
69.0
$283,475
$320,665
$395,045
$469,425
$543,805
$618,185
$729,755
$804,135
$841,325
$1,027,275
$1,213,225
$1,361,985
Ohio
80-99.99
85.1
$332,562
$371,601
$449,679
$527,757
$605,835
$683,913
$801,030
$879,108
$918,147
$1,113,342
$1,308,537
$1,464,693
Ohio
100 <
145.0
$588,292
$663,476
$813,844
$964,212
$1,114,580
$1,264,948
$1,490,500
$1,640,868
$1,716,052
$2,091,972
$2,467,892
$2,768,628
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$85,209
$102,304
$136,494
$170,684
$204,874
$239,064
$290,349
$324,539
$341,634
$427,109
$512,584
$580,964
Oklahoma
15-19.99
17.0
$104,276
$122,074
$157,670
$193,266
$228,862
$264,458
$317,852
$353,448
$371,246
$460,236
$549,226
$620,418
Oklahoma
20-29.99
23.0
$127,155
$145,796
$183,078
$220,360
$257,642
$294,924
$350,847
$388,129
$406,770
$499,975
$593,180
$667,744
Oklahoma
30-39.99
34.0
$201,238
$233,771
$298,837
$363,903
$428,969
$494,035
$591,634
$656,700
$689,233
$851,898
$1,014,563
$1,144,695
Oklahoma
40-59.99
46.0
$246,506
$280,235
$347,693
$415,151
$482,609
$550,067
$651,254
$718,712
$752,441
$921,086
$1,089,731
$1,224,647
Oklahoma
60-79.99
69.0
$367,737
$418,433
$519,825
$621,217
$722,609
$824,001
$976,089
$1,077,481
$1,128,177
$1,381,657
$1,635,137
$1,837,921
Oklahoma
80-99.99
85.1
$428,691
$481,211
$586,251
$691,291
$796,331
$901,371
$1,058,931
$1,163,971
$1,216,491
$1,479,091
$1,741,691
$1,951,771
Oklahoma
100 <
145.0
$761,974
$864,158
$1,068,526
$1,272,894
$1,477,262
$1,681,630
$1,988,182
$2,192,550
$2,294,734
$2,805,654
$3,316,574
$3,725,310
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-226

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$56,500
$74,002
$109,006
$144,010
$179,014
$214,018
$266,524
$301,528
$319,030
$406,540
$494,050
$564,058
Oregon
15-19.99
17.0
$63,604
$81,978
$118,726
$155,474
$192,222
$228,970
$284,092
$320,840
$339,214
$431,084
$522,954
$596,450
Oregon
20-29.99
23.0
$72,129
$91,549
$130,389
$169,229
$208,069
$246,909
$305,169
$344,009
$363,429
$460,529
$557,629
$635,309
Oregon
30-39.99
34.0
$87,833
$109,247
$152,075
$194,903
$237,731
$280,559
$344,801
$387,629
$409,043
$516,113
$623,183
$708,839
Oregon
40-59.99
46.0
$104,956
$128,537
$175,699
$222,861
$270,023
$317,185
$387,928
$435,090
$458,671
$576,576
$694,481
$788,805
Oregon
60-79.99
69.0
$167,639
$205,444
$281,054
$356,664
$432,274
$507,884
$621,299
$696,909
$734,714
$923,739
$1,112,764
$1,263,984
Oregon
80-99.99
85.1
$189,822
$229,744
$309,588
$389,432
$469,276
$549,120
$668,886
$748,730
$788,652
$988,262
$1,187,872
$1,347,560
Oregon
100 <
145.0
$344,868
$421,344
$574,296
$727,248
$880,200
$1,033,152
$1,262,580
$1,415,532
$1,492,008
$1,874,388
$2,256,768
$2,562,672
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$63,326
$80,874
$115,970
$151,066
$186,162
$221,258
$273,902
$308,998
$326,546
$414,286
$502,026
$572,218
Pennsylvania
15-19.99
17.0
$73,274
$91,713
$128,591
$165,469
$202,347
$239,225
$294,542
$331,420
$349,859
$442,054
$534,249
$608,005
Pennsylvania
20-29.99
23.0
$85,211
$104,719
$143,735
$182,751
$221,767
$260,783
$319,307
$358,323
$377,831
$475,371
$572,911
$650,943
Pennsylvania
30-39.99
34.0
$107,172
$128,716
$171,804
$214,892
$257,980
$301,068
$365,700
$408,788
$430,332
$538,052
$645,772
$731,948
Pennsylvania
40-59.99
46.0
$162,115
$197,074
$266,992
$336,910
$406,828
$476,746
$581,623
$651,541
$686,500
$861,295
$1,036,090
$1,175,926
Pennsylvania
60-79.99
69.0
$206,810
$244,803
$320,789
$396,775
$472,761
$548,747
$662,726
$738,712
$776,705
$966,670
$1,156,635
$1,308,607
Pennsylvania
80-99.99
85.1
$273,053
$328,334
$438,896
$549,458
$660,020
$770,582
$936,425
$1,046,987
$1,102,268
$1,378,673
$1,655,078
$1,876,202
Pennsylvania
100 <
145.0
$427,184
$504,054
$657,794
$811,534
$965,274
$1,119,014
$1,349,624
$1,503,364
$1,580,234
$1,964,584
$2,348,934
$2,656,414
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$84,678
$102,386
$137,802
$173,218
$208,634
$244,050
$297,174
$332,590
$350,298
$438,838
$527,378
$598,210
Rhode Island
15-19.99
17.0
$103,523
$122,190
$159,524
$196,858
$234,192
$271,526
$327,527
$364,861
$383,528
$476,863
$570,198
$644,866
Rhode Island
20-29.99
23.0
$126,136
$145,952
$185,584
$225,216
$264,848
$304,480
$363,928
$403,560
$423,376
$522,456
$621,536
$700,800
Rhode Island
30-39.99
34.0
$167,670
$189,669
$233,667
$277,665
$321,663
$365,661
$431,658
$475,656
$497,655
$607,650
$717,645
$805,641
Rhode Island
40-59.99
46.0
$243,786
$279,182
$349,974
$420,766
$491,558
$562,350
$668,538
$739,330
$774,726
$951,706
$1,128,686
$1,270,270
Rhode Island
60-79.99
69.0
$329,317
$367,965
$445,261
$522,557
$599,853
$677,149
$793,093
$870,389
$909,037
$1,102,277
$1,295,517
$1,450,109
Rhode Island
80-99.99
85.1
$424,255
$480,455
$592,855
$705,255
$817,655
$930,055
$1,098,655
$1,211,055
$1,267,255
$1,548,255
$1,829,255
$2,054,055
Rhode Island
100 <
145.0
$684,626
$762,874
$919,370
$1,075,866
$1,232,362
$1,388,858
$1,623,602
$1,780,098
$1,858,346
$2,249,586
$2,640,826
$2,953,818
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-227

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$82,481
$100,226
$135,716
$171,206
$206,696
$242,186
$295,421
$330,911
$348,656
$437,381
$526,106
$597,086
South Carolina
15-19.99
17.0
$100,410
$119,128
$156,564
$194,000
$231,436
$268,872
$325,026
$362,462
$381,180
$474,770
$568,360
$643,232
South Carolina
20-29.99
23.0
$122,000
$141,961
$181,883
$221,805
$261,727
$301,649
$361,532
$401,454
$421,415
$521,220
$621,025
$700,869
South Carolina
30-39.99
34.0
$192,972
$226,810
$294,486
$362,162
$429,838
$497,514
$599,028
$666,704
$700,542
$869,732
$1,038,922
$1,174,274
South Carolina
40-59.99
46.0
$235,449
$271,070
$342,312
$413,554
$484,796
$556,038
$662,901
$734,143
$769,764
$947,869
$1,125,974
$1,268,458
South Carolina
60-79.99
69.0
$351,499
$405,381
$513,145
$620,909
$728,673
$836,437
$998,083
$1,105,847
$1,159,729
$1,429,139
$1,698,549
$1,914,077
South Carolina
80-99.99
85.1
$408,624
$465,033
$577,851
$690,669
$803,487
$916,305
$1,085,532
$1,198,350
$1,254,759
$1,536,804
$1,818,849
$2,044,485
South Carolina
100 <
145.0
$727,834
$836,696
$1,054,420
$1,272,144
$1,489,868
$1,707,592
$2,034,178
$2,251,902
$2,360,764
$2,905,074
$3,449,384
$3,884,832
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$31,491
$44,553
$70,677
$96,801
$122,925
$149,049
$188,235
$214,359
$227,421
$292,731
$358,041
$410,289
South Dakota
15-19.99
17.0
$53,350
$69,856
$102,868
$135,880
$168,892
$201,904
$251,422
$284,434
$300,940
$383,470
$466,000
$532,024
South Dakota
20-29.99
23.0
$58,357
$75,351
$109,339
$143,327
$177,315
$211,303
$262,285
$296,273
$313,267
$398,237
$483,207
$551,183
South Dakota
30-39.99
34.0
$67,400
$85,153
$120,659
$156,165
$191,671
$227,177
$280,436
$315,942
$333,695
$422,460
$511,225
$582,237
South Dakota
40-59.99
46.0
$77,264
$95,844
$133,004
$170,164
$207,324
$244,484
$300,224
$337,384
$355,964
$448,864
$541,764
$616,084
South Dakota
60-79.99
69.0
$128,314
$160,831
$225,865
$290,899
$355,933
$420,967
$518,518
$583,552
$616,069
$778,654
$941,239
$1,071,307
South Dakota
80-99.99
85.1
$141,226
$174,531
$241,141
$307,751
$374,361
$440,971
$540,886
$607,496
$640,801
$807,326
$973,851
$1,107,071
South Dakota
100 <
145.0
$262,244
$327,622
$458,378
$589,134
$719,890
$850,646
$1,046,780
$1,177,536
$1,242,914
$1,569,804
$1,896,694
$2,158,206
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$77,298
$95,077
$130,635
$166,193
$201,751
$237,309
$290,646
$326,204
$343,983
$432,878
$521,773
$592,889
Tennessee
15-19.99
17.0
$93,067
$111,833
$149,365
$186,897
$224,429
$261,961
$318,259
$355,791
$374,557
$468,387
$562,217
$637,281
Tennessee
20-29.99
23.0
$112,066
$132,092
$172,144
$212,196
$252,248
$292,300
$352,378
$392,430
$412,456
$512,586
$612,716
$692,820
Tennessee
30-39.99
34.0
$146,759
$168,957
$213,353
$257,749
$302,145
$346,541
$413,135
$457,531
$479,729
$590,719
$701,709
$790,501
Tennessee
40-59.99
46.0
$215,542
$251,254
$322,678
$394,102
$465,526
$536,950
$644,086
$715,510
$751,222
$929,782
$1,108,342
$1,251,190
Tennessee
60-79.99
69.0
$286,763
$325,698
$403,568
$481,438
$559,308
$637,178
$753,983
$831,853
$870,788
$1,065,463
$1,260,138
$1,415,878
1-228

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$371,820
$428,422
$541,626
$654,830
$768,034
$881,238
$1,051,044
$1,164,248
$1,220,850
$1,503,860
$1,786,870
$2,013,278
Tennessee
100 <
145.0
$665,126
$774,318
$992,702
$1,211,086
$1,429,470
$1,647,854
$1,975,430
$2,193,814
$2,303,006
$2,848,966
$3,394,926
$3,831,694
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$94,815
$111,895
$146,055
$180,215
$214,375
$248,535
$299,775
$333,935
$351,015
$436,415
$521,815
$590,135
Texas
15-19.99
17.0
$117,884
$135,661
$171,215
$206,769
$242,323
$277,877
$331,208
$366,762
$384,539
$473,424
$562,309
$633,417
Texas
20-29.99
23.0
$145,567
$164,180
$201,406
$238,632
$275,858
$313,084
$368,923
$406,149
$424,762
$517,827
$610,892
$685,344
Texas
30-39.99
34.0
$228,468
$260,971
$325,977
$390,983
$455,989
$520,995
$618,504
$683,510
$716,013
$878,528
$1,041,043
$1,171,055
Texas
40-59.99
46.0
$283,346
$317,034
$384,410
$451,786
$519,162
$586,538
$687,602
$754,978
$788,666
$957,106
$1,125,546
$1,260,298
Texas
60-79.99
69.0
$422,988
$473,614
$574,866
$676,118
$777,370
$878,622
$1,030,500
$1,131,752
$1,182,378
$1,435,508
$1,688,638
$1,891,142
Texas
80-99.99
85.1
$529,212
$594,232
$724,272
$854,312
$984,352
$1,114,392
$1,309,452
$1,439,492
$1,504,512
$1,829,612
$2,154,712
$2,414,792
Texas
100 <
145.0
$878,084
$980,122
$1,184,198
$1,388,274
$1,592,350
$1,796,426
$2,102,540
$2,306,616
$2,408,654
$2,918,844
$3,429,034
$3,837,186
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$22,167
$34,942
$60,492
$86,042
$111,592
$137,142
$175,467
$201,017
$213,792
$277,667
$341,542
$392,642
Utah
15-19.99
17.0
$23,352
$37,312
$65,232
$93,152
$121,072
$148,992
$190,872
$218,792
$232,752
$302,552
$372,352
$428,192
Utah
20-29.99
23.0
$24,714
$40,036
$70,680
$101,324
$131,968
$162,612
$208,578
$239,222
$254,544
$331,154
$407,764
$469,052
Utah
30-39.99
34.0
$41,571
$59,100
$94,158
$129,216
$164,274
$199,332
$251,919
$286,977
$304,506
$392,151
$479,796
$549,912
Utah
40-59.99
46.0
$42,319
$60,596
$97,150
$133,704
$170,258
$206,812
$261,643
$298,197
$316,474
$407,859
$499,244
$572,352
Utah
60-79.99
69.0
$43,753
$63,464
$102,886
$142,308
$181,730
$221,152
$280,285
$319,707
$339,418
$437,973
$536,528
$615,372
Utah
80-99.99
85.1
$44,832
$65,622
$107,202
$148,782
$190,362
$231,942
$294,312
$335,892
$356,682
$460,632
$564,582
$647,742
Utah
100 <
145.0
$88,092
$128,100
$208,116
$288,132
$368,148
$448,164
$568,188
$648,204
$688,212
$888,252
$1,088,292
$1,248,324
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$69,178
$86,335
$120,649
$154,963
$189,277
$223,591
$275,062
$309,376
$326,533
$412,318
$498,103
$566,731
Vermont
15-19.99
17.0
$81,564
$99,449
$135,219
$170,989
$206,759
$242,529
$296,184
$331,954
$349,839
$439,264
$528,689
$600,229
Vermont
20-29.99
23.0
$96,428
$115,187
$152,705
$190,223
$227,741
$265,259
$321,536
$359,054
$377,813
$471,608
$565,403
$640,439
1-229

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$123,752
$144,188
$185,060
$225,932
$266,804
$307,676
$368,984
$409,856
$430,292
$532,472
$634,652
$716,396
Vermont
40-59.99
46.0
$153,479
$175,662
$220,028
$264,394
$308,760
$353,126
$419,675
$464,041
$486,224
$597,139
$708,054
$796,786
Vermont
60-79.99
69.0
$241,111
$277,508
$350,302
$423,096
$495,890
$568,684
$677,875
$750,669
$787,066
$969,051
$1,151,036
$1,296,624
Vermont
80-99.99
85.1
$280,313
$318,373
$394,493
$470,613
$546,733
$622,853
$737,033
$813,153
$851,213
$1,041,513
$1,231,813
$1,384,053
Vermont
100 <
145.0
$499,266
$572,782
$719,814
$866,846
$1,013,878
$1,160,910
$1,381,458
$1,528,490
$1,602,006
$1,969,586
$2,337,166
$2,631,230
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$69,473
$86,956
$121,922
$156,888
$191,854
$226,820
$279,269
$314,235
$331,718
$419,133
$506,548
$576,480
Virginia
15-19.99
17.0
$81,981
$100,328
$137,022
$173,716
$210,410
$247,104
$302,145
$338,839
$357,186
$448,921
$540,656
$614,044
Virginia
20-29.99
23.0
$96,992
$116,376
$155,144
$193,912
$232,680
$271,448
$329,600
$368,368
$387,752
$484,672
$581,592
$659,128
Virginia
30-39.99
34.0
$124,587
$145,947
$188,667
$231,387
$274,107
$316,827
$380,907
$423,627
$444,987
$551,787
$658,587
$744,027
Virginia
40-59.99
46.0
$185,750
$220,533
$290,099
$359,665
$429,231
$498,797
$603,146
$672,712
$707,495
$881,410
$1,055,325
$1,194,457
Virginia
60-79.99
69.0
$242,261
$279,989
$355,445
$430,901
$506,357
$581,813
$694,997
$770,453
$808,181
$996,821
$1,185,461
$1,336,373
Virginia
80-99.99
85.1
$316,731
$371,641
$481,461
$591,281
$701,101
$810,921
$975,651
$1,085,471
$1,140,381
$1,414,931
$1,689,481
$1,909,121
Virginia
100 <
145.0
$501,682
$577,996
$730,624
$883,252
$1,035,880
$1,188,508
$1,417,450
$1,570,078
$1,646,392
$2,027,962
$2,409,532
$2,714,788
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$50,316
$67,065
$100,563
$134,061
$167,559
$201,057
$251,304
$284,802
$301,551
$385,296
$469,041
$536,037
Washington
15-19.99
17.0
$76,266
$94,242
$130,194
$166,146
$202,098
$238,050
$291,978
$327,930
$345,906
$435,786
$525,666
$597,570
Washington
20-29.99
23.0
$89,259
$108,141
$145,905
$183,669
$221,433
$259,197
$315,843
$353,607
$372,489
$466,899
$561,309
$636,837
Washington
30-39.99
34.0
$113,157
$133,776
$175,014
$216,252
$257,490
$298,728
$360,585
$401,823
$422,442
$525,537
$628,632
$711,108
Washington
40-59.99
46.0
$139,144
$161,575
$206,437
$251,299
$296,161
$341,023
$408,316
$453,178
$475,609
$587,764
$699,919
$789,643
Washington
60-79.99
69.0
$189,102
$215,156
$267,264
$319,372
$371,480
$423,588
$501,750
$553,858
$579,912
$710,182
$840,452
$944,668
Washington
80-99.99
85.1
$253,660
$292,045
$368,815
$445,585
$522,355
$599,125
$714,280
$791,050
$829,435
$1,021,360
$1,213,285
$1,366,825
Washington
100 <
145.0
$393,364
$446,530
$552,862
$659,194
$765,526
$871,858
$1,031,356
$1,137,688
$1,190,854
$1,456,684
$1,722,514
$1,935,178
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-230

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 3 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$58,061
$75,671
$110,891
$146,111
$181,331
$216,551
$269,381
$304,601
$322,211
$410,261
$498,311
$568,751
West Virginia
15-19.99
17.0
$65,815
$84,342
$121,396
$158,450
$195,504
$232,558
$288,139
$325,193
$343,720
$436,355
$528,990
$603,098
West Virginia
20-29.99
23.0
$75,119
$94,746
$134,000
$173,254
$212,508
$251,762
$310,643
$349,897
$369,524
$467,659
$565,794
$644,302
West Virginia
30-39.99
34.0
$92,253
$113,973
$157,413
$200,853
$244,293
$287,733
$352,893
$396,333
$418,053
$526,653
$635,253
$722,133
West Virginia
40-59.99
46.0
$110,938
$134,934
$182,926
$230,918
$278,910
$326,902
$398,890
$446,882
$470,878
$590,858
$710,838
$806,822
West Virginia
60-79.99
69.0
$176,430
$214,676
$291,168
$367,660
$444,152
$520,644
$635,382
$711,874
$750,120
$941,350
$1,132,580
$1,285,564
West Virginia
80-99.99
85.1
$200,665
$241,131
$322,063
$402,995
$483,927
$564,859
$686,257
$767,189
$807,655
$1,009,985
$1,212,315
$1,374,179
West Virginia
100 <
145.0
$363,342
$440,744
$595,548
$750,352
$905,156
$1,059,960
$1,292,166
$1,446,970
$1,524,372
$1,911,382
$2,298,392
$2,608,000
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$73,301
$90,327
$124,379
$158,431
$192,483
$226,535
$277,613
$311,665
$328,691
$413,821
$498,951
$567,055
Wisconsin
15-19.99
17.0
$87,406
$105,106
$140,506
$175,906
$211,306
$246,706
$299,806
$335,206
$352,906
$441,406
$529,906
$600,706
Wisconsin
20-29.99
23.0
$104,331
$122,840
$159,858
$196,876
$233,894
$270,912
$326,439
$363,457
$381,966
$474,511
$567,056
$641,092
Wisconsin
30-39.99
34.0
$135,437
$155,504
$195,638
$235,772
$275,906
$316,040
$376,241
$416,375
$436,442
$536,777
$637,112
$717,380
Wisconsin
40-59.99
46.0
$169,287
$190,971
$234,339
$277,707
$321,075
$364,443
$429,495
$472,863
$494,547
$602,967
$711,387
$798,123
Wisconsin
60-79.99
69.0
$265,041
$300,907
$372,639
$444,371
$516,103
$587,835
$695,433
$767,165
$803,031
$982,361
$1,161,691
$1,305,155
Wisconsin
80-99.99
85.1
$309,827
$347,232
$422,042
$496,852
$571,662
$646,472
$758,687
$833,497
$870,902
$1,057,927
$1,244,952
$1,394,572
Wisconsin
100 <
145.0
$549,554
$621,954
$766,754
$911,554
$1,056,354
$1,201,154
$1,418,354
$1,563,154
$1,635,554
$1,997,554
$2,359,554
$2,649,154
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$29,856
$42,664
$68,280
$93,896
$119,512
$145,128
$183,552
$209,168
$221,976
$286,016
$350,056
$401,288
Wyoming
15-19.99
17.0
$34,245
$48,252
$76,266
$104,280
$132,294
$160,308
$202,329
$230,343
$244,350
$314,385
$384,420
$440,448
Wyoming
20-29.99
23.0
$55,502
$72,288
$105,860
$139,432
$173,004
$206,576
$256,934
$290,506
$307,292
$391,222
$475,152
$542,296
Wyoming
30-39.99
34.0
$63,288
$80,843
$115,953
$151,063
$186,173
$221,283
$273,948
$309,058
$326,613
$414,388
$502,163
$572,383
Wyoming
40-59.99
46.0
$71,701
$90,013
$126,637
$163,261
$199,885
$236,509
$291,445
$328,069
$346,381
$437,941
$529,501
$602,749
Wyoming
60-79.99
69.0
$87,827
$107,591
$147,119
$186,647
$226,175
$265,703
$324,995
$364,523
$384,287
$483,107
$581,927
$660,983
Wyoming
80-99.99
85.1
$99,189
$120,044
$161,754
$203,464
$245,174
$286,884
$349,449
$391,159
$412,014
$516,289
$620,564
$703,984
Wyoming
100 <
145.0
$180,710
$220,828
$301,064
$381,300
$461,536
$541,772
$662,126
$742,362
$782,480
$983,070
$1,183,660
$1,344,132
1-231

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$9,099
$10,371
$12,917
$15,462
$18,007
$20,552
$24,370
$26,915
$28,188
$34,551
$40,914
$46,005
Alabama
15-19.99
17.0
$10,198
$11,693
$14,682
$17,671
$20,660
$23,649
$28,133
$31,122
$32,616
$40,089
$47,562
$53,540
Alabama
20-29.99
23.0
$17,157
$19,417
$23,939
$28,461
$32,982
$37,504
$44,287
$48,808
$51,069
$62,374
$73,678
$82,721
Alabama
30-39.99
34.0
$19,298
$22,047
$27,545
$33,043
$38,542
$44,040
$52,287
$57,785
$60,534
$74,280
$88,025
$99,021
Alabama
40-59.99
46.0
$20,409
$23,931
$30,974
$38,017
$45,061
$52,104
$62,669
$69,713
$73,234
$90,843
$108,451
$122,538
Alabama
60-79.99
69.0
$29,710
$34,753
$44,838
$54,923
$65,008
$75,093
$90,221
$100,306
$105,349
$130,561
$155,774
$175,944
Alabama
80-99.99
85.1
$30,750
$36,507
$48,021
$59,535
$71,050
$82,564
$99,835
$111,350
$117,107
$145,892
$174,678
$197,707
Alabama
100 <
145.0
$46,148
$55,304
$73,615
$91,927
$110,238
$128,550
$156,017
$174,329
$183,485
$229,264
$275,043
$311,666
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$8,949
$10,072
$12,318
$14,564
$16,810
$19,056
$22,425
$24,671
$25,794
$31,409
$37,023
$41,515
Alaska
15-19.99
17.0
$9,986
$11,269
$13,834
$16,399
$18,964
$21,529
$25,377
$27,942
$29,224
$35,637
$42,050
$47,180
Alaska
20-29.99
23.0
$16,870
$18,844
$22,792
$26,740
$30,688
$34,636
$40,558
$44,506
$46,480
$56,350
$66,221
$74,117
Alaska
30-39.99
34.0
$18,874
$21,199
$25,849
$30,499
$35,150
$39,800
$46,775
$51,425
$53,750
$65,376
$77,001
$86,302
Alaska
40-59.99
46.0
$19,835
$22,783
$28,679
$34,576
$40,472
$46,368
$55,212
$61,108
$64,056
$78,797
$93,537
$105,329
Alaska
60-79.99
69.0
$28,850
$33,032
$41,396
$49,760
$58,125
$66,489
$79,035
$87,399
$91,581
$112,492
$133,402
$150,131
Alaska
80-99.99
85.1
$29,688
$34,384
$43,776
$53,168
$62,560
$71,952
$86,039
$95,431
$100,127
$123,607
$147,086
$165,870
Alaska
100 <
145.0
$44,340
$51,687
$66,382
$81,078
$95,773
$110,468
$132,511
$147,206
$154,554
$191,292
$228,030
$257,420
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$8,303
$9,127
$10,775
$12,423
$14,072
$15,720
$18,192
$19,840
$20,664
$24,784
$28,905
$32,201
Arizona
15-19.99
17.0
$8,920
$9,779
$11,497
$13,215
$14,933
$16,651
$19,229
$20,947
$21,806
$26,101
$30,397
$33,833
Arizona
20-29.99
23.0
$15,603
$17,004
$19,806
$22,608
$25,411
$28,213
$32,416
$35,218
$36,619
$43,625
$50,630
$56,235
Arizona
30-39.99
34.0
$16,741
$18,219
$21,176
$24,132
$27,088
$30,044
$34,479
$37,435
$38,913
$46,304
$53,695
$59,608
1-232

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$17,403
$19,206
$22,810
$26,414
$30,019
$33,623
$39,030
$42,634
$44,437
$53,448
$62,459
$69,668
Arizona
60-79.99
69.0
$25,202
$27,665
$32,592
$37,519
$42,445
$47,372
$54,762
$59,689
$62,152
$74,468
$86,785
$96,638
Arizona
80-99.99
85.1
$27,569
$30,145
$35,297
$40,449
$45,601
$50,753
$58,482
$63,634
$66,210
$79,090
$91,971
$102,275
Arizona
100 <
145.0
$36,968
$40,703
$48,175
$55,646
$63,117
$70,589
$81,796
$89,267
$93,003
$111,681
$130,359
$145,302
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$9,083
$10,340
$12,855
$15,369
$17,884
$20,398
$24,170
$26,684
$27,941
$34,227
$40,513
$45,542
Arkansas
15-19.99
17.0
$10,176
$11,649
$14,594
$17,540
$20,485
$23,430
$27,849
$30,794
$32,267
$39,630
$46,993
$52,884
Arkansas
20-29.99
23.0
$17,127
$19,358
$23,821
$28,283
$32,746
$37,208
$43,902
$48,365
$50,596
$61,752
$72,909
$81,834
Arkansas
30-39.99
34.0
$19,254
$21,960
$27,370
$32,781
$38,192
$43,602
$51,719
$57,129
$59,835
$73,361
$86,888
$97,710
Arkansas
40-59.99
46.0
$20,350
$23,812
$30,737
$37,662
$44,588
$51,513
$61,900
$68,825
$72,288
$89,601
$106,913
$120,764
Arkansas
60-79.99
69.0
$29,622
$34,575
$44,483
$54,391
$64,298
$74,206
$89,067
$98,975
$103,929
$128,698
$153,467
$173,282
Arkansas
80-99.99
85.1
$30,640
$36,288
$47,583
$58,879
$70,174
$81,470
$98,413
$109,708
$115,356
$143,594
$171,833
$194,424
Arkansas
100 <
145.0
$45,961
$54,931
$72,869
$90,808
$108,747
$126,685
$153,593
$171,532
$180,501
$225,348
$270,195
$306,072
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$8,766
$9,706
$11,585
$13,465
$15,344
$17,224
$20,043
$21,922
$22,862
$27,561
$32,260
$36,019
California
15-19.99
17.0
$9,727
$10,750
$12,796
$14,842
$16,888
$18,934
$22,003
$24,049
$25,072
$30,186
$35,301
$39,393
California
20-29.99
23.0
$16,519
$18,141
$21,387
$24,633
$27,879
$31,124
$35,993
$39,239
$40,862
$48,976
$57,090
$63,582
California
30-39.99
34.0
$18,355
$20,161
$23,773
$27,385
$30,997
$34,609
$40,027
$43,639
$45,445
$54,474
$63,504
$70,728
California
40-59.99
46.0
$19,133
$21,379
$25,870
$30,362
$34,853
$39,345
$46,082
$50,573
$52,819
$64,048
$75,276
$84,259
California
60-79.99
69.0
$27,796
$30,925
$37,182
$43,439
$49,697
$55,954
$65,340
$71,597
$74,725
$90,368
$106,011
$118,526
California
80-99.99
85.1
$28,389
$31,786
$38,579
$45,372
$52,165
$58,959
$69,148
$75,942
$79,338
$96,321
$113,304
$126,891
California
100 <
145.0
$42,126
$47,260
$57,527
$67,794
$78,062
$88,329
$103,730
$113,998
$119,132
$144,800
$170,469
$191,004
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$8,711
$9,595
$11,364
$13,133
$14,902
$16,671
$19,325
$21,094
$21,979
$26,401
$30,824
$34,362
1-233

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$9,648
$10,593
$12,483
$14,372
$16,262
$18,151
$20,986
$22,875
$23,820
$28,544
$33,267
$37,047
Colorado
20-29.99
23.0
$16,413
$17,930
$20,964
$23,998
$27,032
$30,066
$34,617
$37,651
$39,168
$46,753
$54,338
$60,407
Colorado
30-39.99
34.0
$18,198
$19,848
$23,147
$26,446
$29,745
$33,044
$37,993
$41,292
$42,941
$51,189
$59,436
$66,035
Colorado
40-59.99
46.0
$18,921
$20,955
$25,023
$29,092
$33,160
$37,228
$43,330
$47,398
$49,432
$59,602
$69,773
$77,909
Colorado
60-79.99
69.0
$27,479
$30,290
$35,912
$41,534
$47,157
$52,779
$61,212
$66,834
$69,645
$83,701
$97,756
$109,000
Colorado
80-99.99
85.1
$27,998
$31,003
$37,013
$43,023
$49,033
$55,043
$64,058
$70,068
$73,073
$88,098
$103,123
$115,143
Colorado
100 <
145.0
$41,459
$45,925
$54,858
$63,791
$72,724
$81,657
$95,056
$103,989
$108,456
$130,788
$153,121
$170,987
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$9,048
$10,271
$12,716
$15,160
$17,605
$20,050
$23,717
$26,162
$27,384
$33,496
$39,608
$44,498
Connecticut
15-19.99
17.0
$10,127
$11,550
$14,397
$17,244
$20,091
$22,937
$27,208
$30,054
$31,478
$38,595
$45,712
$51,405
Connecticut
20-29.99
23.0
$17,060
$19,225
$23,554
$27,883
$32,212
$36,541
$43,035
$47,364
$49,529
$60,352
$71,175
$79,833
Connecticut
30-39.99
34.0
$19,156
$21,762
$26,976
$32,189
$37,403
$42,616
$50,437
$55,650
$58,257
$71,291
$84,325
$94,752
Connecticut
40-59.99
46.0
$20,216
$23,545
$30,204
$36,862
$43,520
$50,179
$60,166
$66,824
$70,153
$86,799
$103,445
$116,761
Connecticut
60-79.99
69.0
$29,422
$34,175
$43,683
$53,190
$62,698
$72,205
$86,466
$95,974
$100,727
$124,496
$148,264
$167,279
Connecticut
80-99.99
85.1
$30,393
$35,794
$46,596
$57,398
$68,200
$79,002
$95,204
$106,006
$111,407
$138,412
$165,416
$187,020
Connecticut
100 <
145.0
$45,541
$54,090
$71,187
$88,285
$105,383
$122,480
$148,127
$165,224
$173,773
$216,517
$259,261
$293,457
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$9,033
$10,241
$12,655
$15,070
$17,484
$19,899
$23,521
$25,935
$27,142
$33,179
$39,215
$44,044
Delaware
15-19.99
17.0
$10,106
$11,508
$14,312
$17,115
$19,919
$22,723
$26,929
$29,733
$31,135
$38,145
$45,155
$50,763
Delaware
20-29.99
23.0
$17,031
$19,167
$23,438
$27,709
$31,980
$36,252
$42,658
$46,930
$49,065
$59,743
$70,421
$78,964
Delaware
30-39.99
34.0
$19,113
$21,677
$26,805
$31,932
$37,060
$42,188
$49,880
$55,008
$57,572
$70,391
$83,211
$93,467
Delaware
40-59.99
46.0
$20,158
$23,430
$29,972
$36,514
$43,057
$49,599
$59,413
$65,955
$69,226
$85,582
$101,938
$115,023
Delaware
60-79.99
69.0
$29,335
$34,001
$43,335
$52,669
$62,002
$71,336
$85,336
$94,670
$99,336
$122,670
$146,004
$164,671
Delaware
80-99.99
85.1
$30,286
$35,580
$46,167
$56,755
$67,342
$77,930
$93,811
$104,398
$109,692
$136,160
$162,629
$183,804
Delaware
100 <
145.0
$45,358
$53,724
$70,457
$87,189
$103,921
$120,654
$145,752
$162,484
$170,850
$212,681
$254,512
$287,977
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-234

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$9,025
$10,225
$12,623
$15,022
$17,420
$19,819
$23,416
$25,815
$27,014
$33,010
$39,006
$43,803
District of
Columbia
15-19.99
17.0
$10,094
$11,485
$14,266
$17,047
$19,828
$22,610
$26,781
$29,563
$30,953
$37,906
$44,859
$50,422
District of
Columbia
20-29.99
23.0
$17,016
$19,136
$23,377
$27,617
$31,857
$36,098
$42,459
$46,699
$48,819
$59,420
$70,021
$78,502
District of
Columbia
30-39.99
34.0
$19,090
$21,631
$26,714
$31,796
$36,878
$41,961
$49,584
$54,667
$57,208
$69,914
$82,620
$92,785
District of
Columbia
40-59.99
46.0
$20,128
$23,368
$29,849
$36,330
$42,811
$49,292
$59,013
$65,494
$68,734
$84,936
$101,139
$114,100
District of
Columbia
60-79.99
69.0
$29,288
$33,909
$43,150
$52,392
$61,633
$70,874
$84,736
$93,978
$98,598
$121,702
$144,805
$163,288
District of
Columbia
80-99.99
85.1
$30,229
$35,466
$45,940
$56,413
$66,887
$77,361
$93,071
$103,545
$108,781
$134,966
$161,150
$182,097
District of
Columbia
100 <
145.0
$45,261
$53,531
$70,069
$86,607
$103,146
$119,684
$144,492
$161,030
$169,299
$210,645
$251,991
$285,068
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$9,240
$10,653
$13,480
$16,307
$19,134
$21,961
$26,202
$29,029
$30,443
$37,510
$44,578
$50,232
Florida
15-19.99
17.0
$10,398
$12,092
$15,480
$18,869
$22,257
$25,645
$30,728
$34,116
$35,810
$44,281
$52,752
$59,529
Florida
20-29.99
23.0
$17,427
$19,958
$25,019
$30,081
$35,143
$40,205
$47,798
$52,860
$55,391
$68,045
$80,700
$90,824
Florida
30-39.99
34.0
$19,697
$22,846
$29,142
$35,439
$41,736
$48,032
$57,477
$63,774
$66,922
$82,664
$98,405
$110,999
Florida
40-59.99
46.0
$20,949
$25,011
$33,135
$41,258
$49,382
$57,506
$69,691
$77,815
$81,877
$102,186
$122,496
$138,743
Florida
60-79.99
69.0
$30,521
$36,373
$48,079
$59,785
$71,490
$83,196
$100,754
$112,460
$118,312
$147,576
$176,840
$200,251
Florida
80-99.99
85.1
$31,749
$38,505
$52,018
$65,531
$79,044
$92,557
$112,826
$126,339
$133,096
$166,878
$200,660
$227,686
Florida
100 <
145.0
$47,851
$58,709
$80,426
$102,143
$123,860
$145,577
$178,152
$199,869
$210,728
$265,020
$319,312
$362,746
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$9,118
$10,411
$12,996
$15,580
$18,165
$20,750
$24,627
$27,211
$28,504
$34,965
$41,427
$46,597
1-235

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$10,226
$11,749
$14,794
$17,839
$20,884
$23,929
$28,496
$31,541
$33,064
$40,676
$48,289
$54,379
Georgia
20-29.99
23.0
$17,194
$19,493
$24,090
$28,688
$33,285
$37,882
$44,778
$49,376
$51,674
$63,168
$74,661
$83,856
Georgia
30-39.99
34.0
$19,354
$22,159
$27,769
$33,379
$38,989
$44,599
$53,014
$58,624
$61,429
$75,454
$89,479
$100,699
Georgia
40-59.99
46.0
$20,485
$24,082
$31,277
$38,471
$45,666
$52,861
$63,653
$70,847
$74,445
$92,432
$110,418
$124,808
Georgia
60-79.99
69.0
$29,824
$34,980
$45,292
$55,604
$65,916
$76,228
$91,696
$102,008
$107,164
$132,944
$158,724
$179,349
Georgia
80-99.99
85.1
$30,890
$36,787
$48,581
$60,375
$72,169
$83,963
$101,655
$113,449
$119,346
$148,832
$178,317
$201,905
Georgia
100 <
145.0
$46,386
$55,781
$74,569
$93,358
$112,146
$130,935
$159,117
$177,906
$187,300
$234,271
$281,243
$318,820
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$8,765
$9,703
$11,581
$13,458
$15,335
$17,213
$20,029
$21,906
$22,844
$27,538
$32,231
$35,986
Hawaii
15-19.99
17.0
$9,725
$10,747
$12,789
$14,832
$16,875
$18,918
$21,982
$24,025
$25,046
$30,153
$35,261
$39,346
Hawaii
20-29.99
23.0
$16,516
$18,137
$21,379
$24,620
$27,862
$31,103
$35,965
$39,207
$40,828
$48,931
$57,035
$63,518
Hawaii
30-39.99
34.0
$18,352
$20,155
$23,760
$27,366
$30,972
$34,577
$39,986
$43,591
$45,394
$54,408
$63,423
$70,634
Hawaii
40-59.99
46.0
$19,129
$21,370
$25,853
$30,336
$34,819
$39,302
$46,026
$50,509
$52,751
$63,958
$75,166
$84,132
Hawaii
60-79.99
69.0
$27,790
$30,912
$37,157
$43,401
$49,646
$55,890
$65,257
$71,501
$74,623
$90,234
$105,846
$118,334
Hawaii
80-99.99
85.1
$28,381
$31,770
$38,547
$45,325
$52,102
$58,880
$69,046
$75,824
$79,212
$96,156
$113,100
$126,655
Hawaii
100 <
145.0
$42,112
$47,233
$57,473
$67,714
$77,955
$88,195
$103,556
$113,797
$118,917
$144,519
$170,120
$190,602
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$8,342
$9,205
$10,932
$12,658
$14,384
$16,110
$18,699
$20,426
$21,289
$25,604
$29,920
$33,372
Idaho
15-19.99
17.0
$8,628
$9,542
$11,371
$13,200
$15,029
$16,858
$19,601
$21,430
$22,344
$26,916
$31,488
$35,146
Idaho
20-29.99
23.0
$15,402
$16,878
$19,829
$22,781
$25,733
$28,685
$33,113
$36,065
$37,541
$44,921
$52,300
$58,204
Idaho
30-39.99
34.0
$16,158
$17,746
$20,924
$24,102
$27,279
$30,457
$35,223
$38,401
$39,990
$47,934
$55,878
$62,233
Idaho
40-59.99
46.0
$17,553
$19,505
$23,409
$27,313
$31,216
$35,120
$40,976
$44,880
$46,832
$56,591
$66,351
$74,158
Idaho
60-79.99
69.0
$25,427
$28,114
$33,490
$38,866
$44,242
$49,617
$57,681
$63,056
$65,744
$79,184
$92,623
$103,374
Idaho
80-99.99
85.1
$25,917
$28,770
$34,476
$40,182
$45,888
$51,594
$60,153
$65,859
$68,712
$82,977
$97,242
$108,654
Idaho
100 <
145.0
$34,868
$39,075
$47,490
$55,905
$64,320
$72,735
$85,358
$93,773
$97,980
$119,018
$140,055
$156,885
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-236

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$8,925
$10,024
$12,222
$14,419
$16,617
$18,815
$22,112
$24,309
$25,408
$30,903
$36,397
$40,793
Illinois
15-19.99
17.0
$9,952
$11,201
$13,697
$16,194
$18,691
$21,188
$24,933
$27,430
$28,679
$34,921
$41,163
$46,156
Illinois
20-29.99
23.0
$16,824
$18,751
$22,607
$26,463
$30,319
$34,174
$39,958
$43,814
$45,742
$55,381
$65,020
$72,732
Illinois
30-39.99
34.0
$18,806
$21,063
$25,576
$30,090
$34,604
$39,117
$45,888
$50,402
$52,659
$63,943
$75,227
$84,254
Illinois
40-59.99
46.0
$19,743
$22,599
$28,310
$34,022
$39,733
$45,445
$54,012
$59,723
$62,579
$76,858
$91,136
$102,559
Illinois
60-79.99
69.0
$28,711
$32,755
$40,842
$48,929
$57,017
$65,104
$77,235
$85,322
$89,366
$109,584
$129,802
$145,976
Illinois
80-99.99
85.1
$29,518
$34,043
$43,093
$52,143
$61,193
$70,244
$83,819
$92,869
$97,394
$120,020
$142,646
$160,746
Illinois
100 <
145.0
$44,049
$51,105
$65,218
$79,332
$93,445
$107,558
$128,727
$142,841
$149,897
$185,180
$220,463
$248,689
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$8,997
$10,168
$12,510
$14,852
$17,194
$19,536
$23,049
$25,392
$26,563
$32,418
$38,273
$42,957
Indiana
15-19.99
17.0
$10,054
$11,405
$14,106
$16,807
$19,509
$22,210
$26,262
$28,963
$30,314
$37,067
$43,820
$49,222
Indiana
20-29.99
23.0
$16,962
$19,028
$23,160
$27,293
$31,425
$35,557
$41,755
$45,888
$47,954
$58,285
$68,615
$76,880
Indiana
30-39.99
34.0
$19,010
$21,471
$26,394
$31,316
$36,239
$41,161
$48,545
$53,468
$55,929
$68,235
$80,541
$90,386
Indiana
40-59.99
46.0
$20,019
$23,152
$29,416
$35,681
$41,945
$48,210
$57,607
$63,871
$67,004
$82,665
$98,326
$110,855
Indiana
60-79.99
69.0
$29,126
$33,585
$42,501
$51,418
$60,335
$69,252
$82,627
$91,544
$96,002
$118,294
$140,587
$158,420
Indiana
80-99.99
85.1
$30,029
$35,066
$45,139
$55,213
$65,286
$75,360
$90,470
$100,543
$105,580
$130,763
$155,947
$176,094
Indiana
100 <
145.0
$44,920
$52,849
$68,705
$84,562
$100,418
$116,275
$140,059
$155,916
$163,844
$203,486
$243,127
$274,840
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$8,910
$9,994
$12,162
$14,329
$16,497
$18,665
$21,917
$24,084
$25,168
$30,588
$36,007
$40,343
Iowa
15-19.99
17.0
$9,931
$11,158
$13,612
$16,067
$18,521
$20,975
$24,657
$27,111
$28,339
$34,474
$40,610
$45,519
Iowa
20-29.99
23.0
$16,795
$18,694
$22,492
$26,290
$30,089
$33,887
$39,584
$43,383
$45,282
$54,777
$64,273
$71,869
Iowa
30-39.99
34.0
$18,763
$20,978
$25,406
$29,835
$34,264
$38,692
$45,336
$49,764
$51,979
$63,050
$74,122
$82,980
Iowa
40-59.99
46.0
$19,685
$22,484
$28,080
$33,677
$39,273
$44,870
$53,264
$58,861
$61,659
$75,650
$89,642
$100,835
Iowa
60-79.99
69.0
$28,625
$32,583
$40,497
$48,412
$56,327
$64,242
$76,114
$84,028
$87,986
$107,773
$127,559
$143,389
Iowa
80-99.99
85.1
$29,411
$33,830
$42,668
$51,505
$60,343
$69,180
$82,436
$91,274
$95,693
$117,786
$139,880
$157,555
1-237

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$43,867
$50,743
$64,493
$78,244
$91,995
$105,746
$126,372
$140,122
$146,998
$181,374
$215,751
$243,252
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$8,965
$10,103
$12,380
$14,657
$16,934
$19,211
$22,626
$24,903
$26,041
$31,733
$37,426
$41,979
Kansas
15-19.99
17.0
$10,008
$11,313
$13,922
$16,530
$19,139
$21,748
$25,662
$28,271
$29,575
$36,097
$42,620
$47,838
Kansas
20-29.99
23.0
$16,899
$18,903
$22,910
$26,918
$30,925
$34,933
$40,944
$44,951
$46,955
$56,973
$66,991
$75,006
Kansas
30-39.99
34.0
$18,918
$21,287
$26,025
$30,762
$35,500
$40,238
$47,345
$52,083
$54,452
$66,296
$78,141
$87,617
Kansas
40-59.99
46.0
$19,895
$22,902
$28,917
$34,931
$40,946
$46,961
$55,983
$61,998
$65,005
$80,042
$95,079
$107,108
Kansas
60-79.99
69.0
$28,939
$33,210
$41,752
$50,294
$58,836
$67,378
$80,191
$88,734
$93,005
$114,360
$135,715
$152,799
Kansas
80-99.99
85.1
$29,798
$34,604
$44,215
$53,826
$63,438
$73,049
$87,466
$97,077
$101,883
$125,911
$149,939
$169,161
Kansas
100 <
145.0
$44,527
$52,061
$67,130
$82,199
$97,268
$112,337
$134,941
$150,010
$157,545
$195,217
$232,890
$263,028
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$9,055
$10,284
$12,742
$15,199
$17,657
$20,115
$23,802
$26,259
$27,488
$33,633
$39,777
$44,693
Kentucky
15-19.99
17.0
$10,136
$11,569
$14,434
$17,299
$20,164
$23,030
$27,327
$30,193
$31,625
$38,788
$45,951
$51,681
Kentucky
20-29.99
23.0
$17,073
$19,250
$23,604
$27,958
$32,312
$36,666
$43,197
$47,551
$49,728
$60,613
$71,499
$80,207
Kentucky
30-39.99
34.0
$19,174
$21,799
$27,050
$32,300
$37,550
$42,801
$50,676
$55,927
$58,552
$71,678
$84,804
$95,304
Kentucky
40-59.99
46.0
$20,241
$23,595
$30,304
$37,012
$43,720
$50,428
$60,490
$67,198
$70,552
$87,323
$104,093
$117,509
Kentucky
60-79.99
69.0
$29,459
$34,250
$43,832
$53,414
$62,997
$72,579
$86,952
$96,535
$101,326
$125,281
$149,237
$168,401
Kentucky
80-99.99
85.1
$30,440
$35,887
$46,781
$57,675
$68,569
$79,463
$95,804
$106,698
$112,145
$139,380
$166,616
$188,404
Kentucky
100 <
145.0
$45,620
$54,247
$71,502
$88,757
$106,011
$123,266
$149,148
$166,403
$175,031
$218,168
$261,305
$295,814
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$9,204
$10,583
$13,339
$16,096
$18,853
$21,609
$25,744
$28,501
$29,879
$36,771
$43,663
$49,176
Louisiana
15-19.99
17.0
$10,348
$11,992
$15,281
$18,570
$21,858
$25,147
$30,080
$33,368
$35,013
$43,234
$51,456
$58,033
Louisiana
20-29.99
23.0
$17,359
$19,823
$24,750
$29,677
$34,604
$39,530
$46,921
$51,848
$54,311
$66,629
$78,946
$88,800
Louisiana
30-39.99
34.0
$19,598
$22,646
$28,743
$34,841
$40,938
$47,035
$56,181
$62,278
$65,327
$80,570
$95,813
$108,007
1-238

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$20,814
$24,741
$32,595
$40,449
$48,303
$56,157
$67,938
$75,792
$79,718
$99,353
$118,988
$134,696
Louisiana
60-79.99
69.0
$30,318
$35,969
$47,270
$58,570
$69,871
$81,172
$98,123
$109,424
$115,075
$143,327
$171,579
$194,181
Louisiana
80-99.99
85.1
$31,499
$38,006
$51,020
$64,034
$77,047
$90,061
$109,582
$122,596
$129,102
$161,637
$194,171
$220,199
Louisiana
100 <
145.0
$47,425
$57,859
$78,725
$99,591
$120,458
$141,324
$172,624
$193,491
$203,924
$256,090
$308,256
$349,989
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$9,019
$10,211
$12,596
$14,981
$17,366
$19,751
$23,329
$25,714
$26,907
$32,869
$38,832
$43,602
Maine
15-19.99
17.0
$10,085
$11,466
$14,228
$16,990
$19,752
$22,515
$26,658
$29,420
$30,801
$37,707
$44,612
$50,137
Maine
20-29.99
23.0
$17,003
$19,110
$23,325
$27,540
$31,755
$35,969
$42,291
$46,506
$48,614
$59,150
$69,687
$78,117
Maine
30-39.99
34.0
$19,071
$21,593
$26,638
$31,682
$36,726
$41,771
$49,337
$54,382
$56,904
$69,515
$82,126
$92,215
Maine
40-59.99
46.0
$20,102
$23,317
$29,746
$36,176
$42,605
$49,034
$58,679
$65,108
$68,323
$84,396
$100,470
$113,329
Maine
60-79.99
69.0
$29,250
$33,832
$42,996
$52,160
$61,325
$70,489
$84,235
$93,399
$97,981
$120,892
$143,802
$162,131
Maine
80-99.99
85.1
$30,182
$35,371
$45,749
$56,128
$66,506
$76,885
$92,453
$102,831
$108,020
$133,967
$159,913
$180,670
Maine
100 <
145.0
$45,180
$53,368
$69,745
$86,121
$102,497
$118,874
$143,438
$159,815
$168,003
$208,944
$249,884
$282,637
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$9,025
$10,225
$12,623
$15,022
$17,420
$19,819
$23,416
$25,815
$27,014
$33,010
$39,006
$43,803
Maryland
15-19.99
17.0
$10,094
$11,485
$14,266
$17,047
$19,828
$22,610
$26,781
$29,563
$30,953
$37,906
$44,859
$50,422
Maryland
20-29.99
23.0
$17,016
$19,136
$23,377
$27,617
$31,857
$36,098
$42,459
$46,699
$48,819
$59,420
$70,021
$78,502
Maryland
30-39.99
34.0
$19,090
$21,631
$26,714
$31,796
$36,878
$41,961
$49,584
$54,667
$57,208
$69,914
$82,620
$92,785
Maryland
40-59.99
46.0
$20,128
$23,368
$29,849
$36,330
$42,811
$49,292
$59,013
$65,494
$68,734
$84,936
$101,139
$114,100
Maryland
60-79.99
69.0
$29,288
$33,909
$43,150
$52,392
$61,633
$70,874
$84,736
$93,978
$98,598
$121,702
$144,805
$163,288
Maryland
80-99.99
85.1
$30,229
$35,466
$45,940
$56,413
$66,887
$77,361
$93,071
$103,545
$108,781
$134,966
$161,150
$182,097
Maryland
100 <
145.0
$45,261
$53,531
$70,069
$86,607
$103,146
$119,684
$144,492
$161,030
$169,299
$210,645
$251,991
$285,068
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$9,027
$10,227
$12,628
$15,029
$17,431
$19,832
$23,433
$25,834
$27,035
$33,038
$39,040
$43,843
1-239

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$10,096
$11,489
$14,274
$17,058
$19,843
$22,628
$26,806
$29,590
$30,983
$37,945
$44,907
$50,477
Massachusetts
20-29.99
23.0
$17,018
$19,141
$23,387
$27,632
$31,878
$36,123
$42,491
$46,737
$48,859
$59,473
$70,087
$78,578
Massachusetts
30-39.99
34.0
$19,094
$21,639
$26,729
$31,818
$36,908
$41,998
$49,633
$54,722
$57,267
$69,992
$82,716
$92,896
Massachusetts
40-59.99
46.0
$20,133
$23,378
$29,869
$36,360
$42,851
$49,342
$59,078
$65,569
$68,814
$85,042
$101,269
$114,251
Massachusetts
60-79.99
69.0
$29,296
$33,924
$43,181
$52,437
$61,693
$70,950
$84,834
$94,091
$98,719
$121,860
$145,001
$163,513
Massachusetts
80-99.99
85.1
$30,239
$35,485
$45,977
$56,469
$66,961
$77,453
$93,192
$103,684
$108,930
$135,160
$161,391
$182,375
Massachusetts
100 <
145.0
$45,277
$53,562
$70,132
$86,702
$103,272
$119,842
$144,697
$161,267
$169,552
$210,978
$252,403
$285,543
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$8,895
$9,964
$12,102
$14,240
$16,377
$18,515
$21,722
$23,860
$24,929
$30,273
$35,618
$39,893
Michigan
15-19.99
17.0
$9,910
$11,116
$13,527
$15,939
$18,351
$20,763
$24,381
$26,793
$27,999
$34,029
$40,058
$44,882
Michigan
20-29.99
23.0
$16,766
$18,636
$22,377
$26,118
$29,859
$33,600
$39,211
$42,952
$44,822
$54,174
$63,526
$71,008
Michigan
30-39.99
34.0
$18,721
$20,893
$25,236
$29,580
$33,924
$38,268
$44,783
$49,127
$51,299
$62,159
$73,018
$81,706
Michigan
40-59.99
46.0
$19,628
$22,369
$27,850
$33,332
$38,814
$44,295
$52,517
$57,999
$60,740
$74,444
$88,148
$99,111
Michigan
60-79.99
69.0
$28,539
$32,410
$40,153
$47,895
$55,637
$63,380
$74,993
$82,736
$86,607
$105,963
$125,319
$140,803
Michigan
80-99.99
85.1
$29,305
$33,617
$42,242
$50,867
$59,492
$68,117
$81,054
$89,679
$93,992
$115,554
$137,116
$154,366
Michigan
100 <
145.0
$43,686
$50,381
$63,769
$77,157
$90,546
$103,934
$124,017
$137,406
$144,100
$177,571
$211,042
$237,819
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$8,878
$9,931
$12,035
$14,140
$16,245
$18,349
$21,506
$23,611
$24,663
$29,925
$35,186
$39,396
Minnesota
15-19.99
17.0
$9,886
$11,069
$13,434
$15,798
$18,163
$20,528
$24,076
$26,441
$27,623
$33,535
$39,448
$44,177
Minnesota
20-29.99
23.0
$16,734
$18,573
$22,250
$25,927
$29,605
$33,282
$38,798
$42,475
$44,314
$53,507
$62,700
$70,054
Minnesota
30-39.99
34.0
$18,674
$20,799
$25,049
$29,298
$33,548
$37,798
$44,173
$48,423
$50,547
$61,172
$71,797
$80,296
Minnesota
40-59.99
46.0
$19,564
$22,242
$27,596
$32,951
$38,305
$43,660
$51,691
$57,046
$59,723
$73,109
$86,495
$97,204
Minnesota
60-79.99
69.0
$28,444
$32,220
$39,771
$47,323
$54,875
$62,426
$73,754
$81,306
$85,081
$103,961
$122,840
$137,943
Minnesota
80-99.99
85.1
$29,187
$33,382
$41,772
$50,162
$58,552
$66,941
$79,526
$87,916
$92,111
$113,085
$134,059
$150,839
Minnesota
100 <
145.0
$43,486
$49,980
$62,968
$75,955
$88,943
$101,931
$121,413
$134,400
$140,894
$173,364
$205,833
$231,809
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-240

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$9,136
$10,446
$13,066
$15,686
$18,306
$20,926
$24,856
$27,476
$28,786
$35,335
$41,885
$47,125
Mississippi
15-19.99
17.0
$10,251
$11,799
$14,893
$17,988
$21,083
$24,178
$28,821
$31,915
$33,463
$41,200
$48,937
$55,127
Mississippi
20-29.99
23.0
$17,228
$19,561
$24,225
$28,890
$33,555
$38,220
$45,217
$49,882
$52,215
$63,877
$75,539
$84,869
Mississippi
30-39.99
34.0
$19,404
$22,259
$27,968
$33,678
$39,388
$45,098
$53,663
$59,372
$62,227
$76,502
$90,776
$102,196
Mississippi
40-59.99
46.0
$20,552
$24,217
$31,547
$38,876
$46,206
$53,536
$64,530
$71,860
$75,525
$93,849
$112,174
$126,833
Mississippi
60-79.99
69.0
$29,925
$35,182
$45,697
$56,212
$66,726
$77,241
$93,013
$103,527
$108,784
$135,071
$161,357
$182,387
Mississippi
80-99.99
85.1
$31,014
$37,036
$49,080
$61,124
$73,168
$85,212
$103,278
$115,322
$121,344
$151,454
$181,564
$205,652
Mississippi
100 <
145.0
$46,599
$56,206
$75,420
$94,634
$113,849
$133,063
$161,884
$181,098
$190,705
$238,740
$286,776
$325,204
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$8,965
$10,104
$12,382
$14,660
$16,937
$19,215
$22,632
$24,910
$26,049
$31,743
$37,438
$41,994
Missour

15-19.99
17.0
$10,009
$11,314
$13,924
$16,534
$19,145
$21,755
$25,670
$28,281
$29,586
$36,111
$42,637
$47,858
Missour

20-29.99
23.0
$16,900
$18,905
$22,914
$26,923
$30,932
$34,942
$40,955
$44,964
$46,969
$56,992
$67,015
$75,033
Missour

30-39.99
34.0
$18,919
$21,289
$26,030
$30,770
$35,511
$40,251
$47,362
$52,103
$54,473
$66,324
$78,176
$87,657
Missour

40-59.99
46.0
$19,896
$22,906
$28,924
$34,942
$40,961
$46,979
$56,006
$62,025
$65,034
$80,080
$95,126
$107,162
Missour

60-79.99
69.0
$28,942
$33,215
$41,763
$50,310
$58,858
$67,405
$80,227
$88,774
$93,048
$114,417
$135,786
$152,881
Missour

80-99.99
85.1
$29,801
$34,610
$44,228
$53,846
$63,464
$73,082
$87,509
$97,127
$101,936
$125,981
$150,026
$169,262
Missour

100 <
145.0
$44,532
$52,073
$67,153
$82,233
$97,314
$112,394
$135,015
$150,095
$157,636
$195,337
$233,038
$263,199
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$8,347
$9,215
$10,951
$12,687
$14,423
$16,158
$18,762
$20,498
$21,366
$25,706
$30,045
$33,517
Montana
15-19.99
17.0
$8,982
$9,903
$11,746
$13,588
$15,431
$17,273
$20,037
$21,879
$22,801
$27,407
$32,013
$35,698
Montana
20-29.99
23.0
$15,687
$17,172
$20,143
$23,113
$26,083
$29,054
$33,509
$36,480
$37,965
$45,391
$52,817
$58,758
Montana
30-39.99
34.0
$16,865
$18,468
$21,673
$24,878
$28,083
$31,288
$36,095
$39,300
$40,903
$48,915
$56,927
$63,337
Montana
40-59.99
46.0
$17,572
$19,542
$23,483
$27,424
$31,365
$35,305
$41,217
$45,157
$47,128
$56,980
$66,832
$74,714
Montana
60-79.99
69.0
$25,454
$28,170
$33,601
$39,033
$44,464
$49,895
$58,042
$63,473
$66,189
$79,767
$93,345
$104,208
Montana
80-99.99
85.1
$25,951
$28,838
$34,613
$40,387
$46,162
$51,936
$60,598
$66,373
$69,260
$83,696
$98,133
$109,682
1-241

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$37,498
$41,764
$50,296
$58,827
$67,359
$75,891
$88,689
$97,220
$101,486
$122,816
$144,145
$161,209
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$8,874
$9,921
$12,016
$14,111
$16,206
$18,301
$21,444
$23,539
$24,587
$29,824
$35,062
$39,252
Nebraska
15-19.99
17.0
$9,879
$11,055
$13,406
$15,758
$18,109
$20,460
$23,987
$26,339
$27,514
$33,393
$39,271
$43,974
Nebraska
20-29.99
23.0
$16,725
$18,555
$22,213
$25,872
$29,531
$33,190
$38,678
$42,337
$44,166
$53,314
$62,461
$69,778
Nebraska
30-39.99
34.0
$18,660
$20,772
$24,994
$29,217
$33,439
$37,662
$43,996
$48,219
$50,330
$60,887
$71,443
$79,889
Nebraska
40-59.99
46.0
$19,546
$22,205
$27,523
$32,840
$38,158
$43,476
$51,452
$56,770
$59,429
$72,723
$86,017
$96,653
Nebraska
60-79.99
69.0
$28,416
$32,164
$39,661
$47,157
$54,654
$62,151
$73,395
$80,892
$84,640
$103,382
$122,123
$137,116
Nebraska
80-99.99
85.1
$29,153
$33,314
$41,636
$49,958
$58,279
$66,601
$79,084
$87,406
$91,566
$112,371
$133,175
$149,819
Nebraska
100 <
145.0
$43,428
$49,864
$62,736
$75,608
$88,480
$101,351
$120,659
$133,531
$139,967
$172,147
$204,326
$230,070
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$8,123
$8,904
$10,467
$12,030
$13,593
$15,156
$17,500
$19,063
$19,845
$23,752
$27,659
$30,785
Nevada
15-19.99
17.0
$8,512
$9,311
$10,909
$12,506
$14,104
$15,701
$18,098
$19,695
$20,494
$24,488
$28,481
$31,676
Nevada
20-29.99
23.0
$15,245
$16,565
$19,204
$21,843
$24,482
$27,121
$31,079
$33,718
$35,038
$41,635
$48,233
$53,511
Nevada
30-39.99
34.0
$15,926
$17,284
$19,999
$22,714
$25,429
$28,144
$32,217
$34,932
$36,289
$43,077
$49,864
$55,294
Nevada
40-59.99
46.0
$17,240
$18,879
$22,157
$25,435
$28,713
$31,991
$36,908
$40,186
$41,825
$50,020
$58,215
$64,771
Nevada
60-79.99
69.0
$24,957
$27,176
$31,613
$36,050
$40,487
$44,924
$51,579
$56,016
$58,235
$69,327
$80,419
$89,293
Nevada
80-99.99
85.1
$25,338
$27,612
$32,160
$36,708
$41,257
$45,805
$52,627
$57,175
$59,450
$70,820
$82,191
$91,287
Nevada
100 <
145.0
$33,881
$37,102
$43,545
$49,987
$56,429
$62,872
$72,535
$78,978
$82,199
$98,304
$114,410
$127,295
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$9,003
$10,180
$12,534
$14,888
$17,241
$19,595
$23,126
$25,480
$26,657
$32,541
$38,426
$43,134
1-242

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$10,063
$11,422
$14,140
$16,857
$19,575
$22,293
$26,370
$29,088
$30,447
$37,242
$44,037
$49,473
New
Hampshire
20-29.99
23.0
$16,973
$19,051
$23,205
$27,360
$31,515
$35,670
$41,902
$46,057
$48,134
$58,522
$68,909
$77,218
New
Hampshire
30-39.99
34.0
$19,027
$21,505
$26,461
$31,416
$36,372
$41,328
$48,762
$53,718
$56,196
$68,585
$80,975
$90,887
New
Hampshire
40-59.99
46.0
$20,042
$23,197
$29,507
$35,816
$42,126
$48,436
$57,900
$64,210
$67,365
$83,139
$98,913
$111,533
New
Hampshire
60-79.99
69.0
$29,160
$33,652
$42,637
$51,621
$60,606
$69,591
$83,067
$92,052
$96,544
$119,006
$141,467
$159,436
New
Hampshire
80-99.99
85.1
$30,071
$35,149
$45,306
$55,463
$65,620
$75,777
$91,013
$101,170
$106,248
$131,640
$157,033
$177,347
New
Hampshire
100 <
145.0
$44,992
$52,991
$68,990
$84,989
$100,987
$116,986
$140,985
$156,983
$164,983
$204,980
$244,977
$276,975
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$9,077
$10,327
$12,828
$15,329
$17,829
$20,330
$24,082
$26,582
$27,833
$34,085
$40,337
$45,339
New Jersey
15-19.99
17.0
$10,167
$11,630
$14,556
$17,482
$20,408
$23,335
$27,724
$30,650
$32,113
$39,429
$46,744
$52,597
New Jersey
20-29.99
23.0
$17,114
$19,332
$23,769
$28,206
$32,642
$37,079
$43,734
$48,170
$50,389
$61,480
$72,572
$81,445
New Jersey
30-39.99
34.0
$19,235
$21,921
$27,294
$32,666
$38,038
$43,411
$51,469
$56,842
$59,528
$72,959
$86,390
$97,135
New Jersey
40-59.99
46.0
$20,324
$23,760
$30,634
$37,507
$44,380
$51,253
$61,563
$68,436
$71,873
$89,056
$106,239
$119,986
New Jersey
60-79.99
69.0
$29,583
$34,498
$44,327
$54,157
$63,987
$73,817
$88,562
$98,392
$103,307
$127,881
$152,456
$172,115
New Jersey
80-99.99
85.1
$30,592
$36,192
$47,391
$58,591
$69,790
$80,990
$97,789
$108,989
$114,588
$142,587
$170,586
$192,985
New Jersey
100 <
145.0
$45,880
$54,767
$72,542
$90,318
$108,093
$125,868
$152,531
$170,306
$179,193
$223,631
$268,069
$303,620
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$8,734
$9,642
$11,458
$13,273
$15,089
$16,905
$19,628
$21,444
$22,352
$26,891
$31,431
$35,062
New Mexico
15-19.99
17.0
$9,039
$10,016
$11,972
$13,928
$15,883
$17,839
$20,772
$22,728
$23,706
$28,595
$33,484
$37,395
New Mexico
20-29.99
23.0
$15,763
$17,325
$20,449
$23,572
$26,696
$29,819
$34,505
$37,628
$39,190
$46,999
$54,807
$61,055
New Mexico
30-39.99
34.0
$16,979
$18,694
$22,125
$25,557
$28,988
$32,419
$37,566
$40,998
$42,713
$51,291
$59,870
$66,732
New Mexico
40-59.99
46.0
$17,725
$19,848
$24,095
$28,342
$32,589
$36,836
$43,207
$47,454
$49,578
$60,195
$70,813
$79,307
New Mexico
60-79.99
69.0
$25,684
$28,629
$34,520
$40,410
$46,301
$52,192
$61,027
$66,918
$69,863
$84,590
$99,316
$111,097
1-243

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$28,163
$31,334
$37,675
$44,016
$50,357
$56,698
$66,209
$72,550
$75,721
$91,573
$107,426
$120,108
New Mexico
100 <
145.0
$41,741
$46,489
$55,986
$65,483
$74,980
$84,477
$98,722
$108,219
$112,968
$136,710
$160,453
$179,447
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$8,967
$10,108
$12,390
$14,671
$16,953
$19,235
$22,657
$24,939
$26,080
$31,784
$37,489
$42,052
New York
15-19.99
17.0
$10,012
$11,320
$13,935
$16,551
$19,167
$21,783
$25,706
$28,322
$29,630
$36,170
$42,709
$47,941
New York
20-29.99
23.0
$16,904
$18,912
$22,929
$26,946
$30,962
$34,979
$41,004
$45,021
$47,029
$57,071
$67,113
$75,146
New York
30-39.99
34.0
$18,925
$21,301
$26,052
$30,804
$35,555
$40,307
$47,434
$52,186
$54,562
$66,441
$78,320
$87,823
New York
40-59.99
46.0
$19,904
$22,921
$28,954
$34,987
$41,021
$47,054
$56,104
$62,137
$65,154
$80,238
$95,321
$107,388
New York
60-79.99
69.0
$28,953
$33,238
$41,808
$50,378
$58,948
$67,518
$80,373
$88,943
$93,228
$114,653
$136,078
$153,219
New York
80-99.99
85.1
$29,815
$34,638
$44,284
$53,930
$63,575
$73,221
$87,690
$97,335
$102,158
$126,273
$150,387
$169,678
New York
100 <
145.0
$44,556
$52,120
$67,248
$82,375
$97,503
$112,631
$135,323
$150,451
$158,014
$195,834
$233,653
$263,909
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$9,035
$10,244
$12,662
$15,081
$17,499
$19,917
$23,544
$25,962
$27,171
$33,217
$39,262
$44,098
North Carolina
15-19.99
17.0
$10,108
$11,513
$14,322
$17,131
$19,940
$22,749
$26,963
$29,772
$31,176
$38,199
$45,221
$50,839
North Carolina
20-29.99
23.0
$17,035
$19,174
$23,452
$27,730
$32,008
$36,286
$42,704
$46,982
$49,121
$59,816
$70,511
$79,068
North Carolina
30-39.99
34.0
$19,118
$21,687
$26,825
$31,963
$37,101
$42,239
$49,947
$55,085
$57,654
$70,499
$83,344
$93,620
North Carolina
40-59.99
46.0
$20,165
$23,443
$30,000
$36,556
$43,112
$49,668
$59,503
$66,059
$69,337
$85,728
$102,119
$115,231
North Carolina
60-79.99
69.0
$29,345
$34,022
$43,377
$52,731
$62,085
$71,440
$85,471
$94,826
$99,503
$122,889
$146,275
$164,984
North Carolina
80-99.99
85.1
$30,299
$35,606
$46,219
$56,832
$67,445
$78,058
$93,978
$104,591
$109,897
$136,430
$162,963
$184,189
North Carolina
100 <
145.0
$45,380
$53,768
$70,544
$87,320
$104,096
$120,872
$146,036
$162,812
$171,200
$213,140
$255,081
$288,633
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$8,741
$9,656
$11,485
$13,314
$15,144
$16,973
$19,717
$21,547
$22,462
$27,035
$31,609
$35,268
North Dakota
15-19.99
17.0
$9,048
$10,036
$12,011
$13,986
$15,961
$17,936
$20,898
$22,873
$23,861
$28,798
$33,736
$37,686
North Dakota
20-29.99
23.0
$16,471
$18,045
$21,195
$24,345
$27,495
$30,644
$35,369
$38,519
$40,094
$47,968
$55,842
$62,142
1-244

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$16,998
$18,733
$22,203
$25,673
$29,143
$32,613
$37,818
$41,288
$43,023
$51,698
$60,374
$67,314
North Dakota
40-59.99
46.0
$19,037
$21,187
$25,486
$29,786
$34,085
$38,385
$44,834
$49,133
$51,283
$62,032
$72,780
$81,379
North Dakota
60-79.99
69.0
$27,652
$30,637
$36,606
$42,575
$48,545
$54,514
$63,468
$69,437
$72,422
$87,345
$102,268
$114,206
North Dakota
80-99.99
85.1
$28,212
$31,431
$37,869
$44,307
$50,745
$57,183
$66,840
$73,278
$76,497
$92,592
$108,687
$121,563
North Dakota
100 <
145.0
$41,823
$46,654
$56,317
$65,979
$75,641
$85,304
$99,797
$109,459
$114,290
$138,446
$162,602
$181,926
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$8,977
$10,127
$12,428
$14,729
$17,029
$19,330
$22,782
$25,082
$26,233
$31,985
$37,737
$42,339
Ohio
15-19.99
17.0
$10,025
$11,347
$13,989
$16,632
$19,275
$21,918
$25,882
$28,525
$29,847
$36,454
$43,061
$48,347
Ohio
20-29.99
23.0
$16,922
$18,949
$23,002
$27,056
$31,109
$35,162
$41,242
$45,295
$47,322
$57,455
$67,588
$75,695
Ohio
30-39.99
34.0
$18,952
$21,355
$26,160
$30,966
$35,772
$40,578
$47,786
$52,592
$54,995
$67,009
$79,023
$88,635
Ohio
40-59.99
46.0
$19,940
$22,994
$29,100
$35,207
$41,313
$47,420
$56,580
$62,686
$65,740
$81,006
$96,273
$108,486
Ohio
60-79.99
69.0
$29,008
$33,348
$42,027
$50,707
$59,387
$68,067
$81,087
$89,767
$94,107
$115,806
$137,506
$154,865
Ohio
80-99.99
85.1
$29,883
$34,774
$44,555
$54,336
$64,117
$73,898
$88,570
$98,351
$103,242
$127,694
$152,147
$171,710
Ohio
100 <
145.0
$44,671
$52,351
$67,709
$83,068
$98,426
$113,785
$136,822
$152,181
$159,860
$198,256
$236,653
$267,370
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$8,923
$10,019
$12,212
$14,405
$16,597
$18,790
$22,079
$24,272
$25,369
$30,851
$36,333
$40,718
Oklahoma
15-19.99
17.0
$9,949
$11,194
$13,683
$16,173
$18,663
$21,153
$24,887
$27,377
$28,622
$34,847
$41,071
$46,051
Oklahoma
20-29.99
23.0
$16,819
$18,742
$22,588
$26,434
$30,281
$34,127
$39,896
$43,742
$45,665
$55,281
$64,896
$72,589
Oklahoma
30-39.99
34.0
$18,799
$21,049
$25,548
$30,048
$34,547
$39,047
$45,796
$50,296
$52,546
$63,795
$75,044
$84,043
Oklahoma
40-59.99
46.0
$19,733
$22,580
$28,272
$33,964
$39,657
$45,349
$53,888
$59,580
$62,427
$76,658
$90,889
$102,273
Oklahoma
60-79.99
69.0
$28,697
$32,726
$40,785
$48,844
$56,902
$64,961
$77,049
$85,107
$89,137
$109,283
$129,430
$145,547
Oklahoma
80-99.99
85.1
$29,500
$34,007
$43,022
$52,037
$61,052
$70,067
$83,590
$92,605
$97,112
$119,650
$142,187
$160,217
Oklahoma
100 <
145.0
$44,019
$51,045
$65,098
$79,151
$93,204
$107,257
$128,337
$142,390
$149,416
$184,549
$219,682
$247,788
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-245

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$9,008
$10,191
$12,555
$14,920
$17,284
$19,649
$23,196
$25,560
$26,742
$32,654
$38,565
$43,294
Oregon
15-19.99
17.0
$10,070
$11,437
$14,170
$16,903
$19,636
$22,369
$26,469
$29,202
$30,568
$37,401
$44,234
$49,700
Oregon
20-29.99
23.0
$16,983
$19,071
$23,246
$27,422
$31,597
$35,773
$42,036
$46,211
$48,299
$58,737
$69,175
$77,526
Oregon
30-39.99
34.0
$19,042
$21,535
$26,521
$31,507
$36,494
$41,480
$48,959
$53,945
$56,438
$68,904
$81,369
$91,342
Oregon
40-59.99
46.0
$20,063
$23,238
$29,589
$35,939
$42,290
$48,641
$58,167
$64,518
$67,693
$83,570
$99,447
$112,148
Oregon
60-79.99
69.0
$29,191
$33,714
$42,760
$51,806
$60,852
$69,898
$83,467
$92,514
$97,037
$119,652
$142,267
$160,359
Oregon
80-99.99
85.1
$30,109
$35,225
$45,458
$55,691
$65,924
$76,157
$91,506
$101,739
$106,855
$132,438
$158,020
$178,485
Oregon
100 <
145.0
$45,056
$53,120
$69,248
$85,377
$101,505
$117,633
$141,825
$157,954
$166,018
$206,338
$246,659
$278,915
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$9,018
$10,210
$12,594
$14,978
$17,362
$19,746
$23,322
$25,706
$26,898
$32,858
$38,818
$43,586
Pennsylvania
15-19.99
17.0
$10,084
$11,464
$14,225
$16,986
$19,746
$22,507
$26,648
$29,408
$30,789
$37,690
$44,592
$50,113
Pennsylvania
20-29.99
23.0
$17,002
$19,108
$23,321
$27,534
$31,746
$35,959
$42,278
$46,490
$48,597
$59,128
$69,660
$78,085
Pennsylvania
30-39.99
34.0
$19,070
$21,590
$26,631
$31,673
$36,714
$41,755
$49,317
$54,358
$56,879
$69,482
$82,085
$92,168
Pennsylvania
40-59.99
46.0
$20,100
$23,312
$29,738
$36,163
$42,588
$49,013
$58,651
$65,077
$68,289
$84,352
$100,415
$113,266
Pennsylvania
60-79.99
69.0
$29,247
$33,826
$42,984
$52,141
$61,299
$70,457
$84,194
$93,352
$97,931
$120,825
$143,720
$162,036
Pennsylvania
80-99.99
85.1
$30,178
$35,363
$45,734
$56,105
$66,475
$76,846
$92,402
$102,773
$107,958
$133,885
$159,812
$180,553
Pennsylvania
100 <
145.0
$45,174
$53,355
$69,718
$86,081
$102,444
$118,807
$143,352
$159,715
$167,896
$208,804
$249,712
$282,438
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$9,052
$10,278
$12,730
$15,182
$17,634
$20,086
$23,763
$26,215
$27,441
$33,571
$39,701
$44,604
Rhode Island
15-19.99
17.0
$10,132
$11,561
$14,417
$17,274
$20,131
$22,988
$27,273
$30,130
$31,558
$38,701
$45,843
$51,556
Rhode Island
20-29.99
23.0
$17,067
$19,238
$23,581
$27,924
$32,267
$36,610
$43,124
$47,467
$49,638
$60,495
$71,352
$80,038
Rhode Island
30-39.99
34.0
$19,166
$21,783
$27,016
$32,250
$37,484
$42,717
$50,568
$55,802
$58,418
$71,503
$84,587
$95,054
Rhode Island
40-59.99
46.0
$20,230
$23,573
$30,258
$36,944
$43,630
$50,315
$60,343
$67,029
$70,372
$87,086
$103,800
$117,171
Rhode Island
60-79.99
69.0
$29,442
$34,216
$43,765
$53,313
$62,861
$72,410
$86,732
$96,281
$101,055
$124,926
$148,797
$167,893
Rhode Island
80-99.99
85.1
$30,419
$35,845
$46,697
$57,549
$68,402
$79,254
$95,533
$106,385
$111,811
$138,942
$166,073
$187,777
Rhode Island
100 <
145.0
$45,584
$54,176
$71,359
$88,543
$105,727
$122,910
$148,686
$165,870
$174,462
$217,421
$260,380
$294,747
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-246

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$9,060
$10,293
$12,761
$15,228
$17,695
$20,163
$23,864
$26,331
$27,564
$33,733
$39,901
$44,836
South Carolina
15-19.99
17.0
$10,143
$11,582
$14,461
$17,340
$20,218
$23,097
$27,415
$30,294
$31,733
$38,930
$46,126
$51,884
South Carolina
20-29.99
23.0
$17,082
$19,268
$23,640
$28,013
$32,385
$36,757
$43,316
$47,688
$49,874
$60,805
$71,736
$80,481
South Carolina
30-39.99
34.0
$19,188
$21,826
$27,104
$32,381
$37,658
$42,936
$50,852
$56,129
$58,768
$71,961
$85,154
$95,709
South Carolina
40-59.99
46.0
$20,260
$23,632
$30,376
$37,121
$43,866
$50,610
$60,727
$67,472
$70,844
$87,706
$104,568
$118,057
South Carolina
60-79.99
69.0
$29,486
$34,305
$43,942
$53,579
$63,216
$72,853
$87,308
$96,945
$101,763
$125,856
$149,948
$169,222
South Carolina
80-99.99
85.1
$30,473
$35,954
$46,916
$57,877
$68,839
$79,800
$96,243
$107,204
$112,685
$140,089
$167,493
$189,416
South Carolina
100 <
145.0
$45,677
$54,362
$71,732
$89,102
$106,471
$123,841
$149,896
$167,266
$175,951
$219,376
$262,800
$297,540
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$8,741
$9,656
$11,485
$13,315
$15,145
$16,974
$19,719
$21,548
$22,463
$27,037
$31,611
$35,271
South Dakota
15-19.99
17.0
$9,691
$10,679
$12,654
$14,630
$16,605
$18,580
$21,543
$23,518
$24,506
$29,444
$34,383
$38,333
South Dakota
20-29.99
23.0
$16,471
$18,046
$21,196
$24,346
$27,496
$30,646
$35,371
$38,522
$40,097
$47,972
$55,847
$62,147
South Dakota
30-39.99
34.0
$18,284
$20,020
$23,490
$26,961
$30,431
$33,902
$39,108
$42,578
$44,314
$52,990
$61,667
$68,608
South Dakota
40-59.99
46.0
$19,037
$21,187
$25,488
$29,788
$34,088
$38,388
$44,839
$49,139
$51,289
$62,040
$72,790
$81,391
South Dakota
60-79.99
69.0
$27,653
$30,638
$36,609
$42,579
$48,549
$54,520
$63,475
$69,445
$72,431
$87,357
$102,282
$114,223
South Dakota
80-99.99
85.1
$28,212
$31,432
$37,871
$44,311
$50,750
$57,190
$66,849
$73,288
$76,508
$92,607
$108,705
$121,584
South Dakota
100 <
145.0
$41,824
$46,657
$56,321
$65,986
$75,651
$85,315
$99,812
$109,477
$114,309
$138,471
$162,633
$181,962
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$9,067
$10,308
$12,789
$15,271
$17,752
$20,234
$23,956
$26,438
$27,679
$33,883
$40,087
$45,050
Tennessee
15-19.99
17.0
$10,153
$11,603
$14,502
$17,400
$20,299
$23,198
$27,547
$30,446
$31,895
$39,142
$46,390
$52,187
Tennessee
20-29.99
23.0
$17,096
$19,295
$23,695
$28,095
$32,494
$36,894
$43,494
$47,893
$50,093
$61,093
$72,092
$80,891
Tennessee
30-39.99
34.0
$19,208
$21,867
$27,185
$32,502
$37,820
$43,138
$51,115
$56,433
$59,091
$72,386
$85,681
$96,316
Tennessee
40-59.99
46.0
$20,287
$23,687
$30,486
$37,285
$44,085
$50,884
$61,083
$67,883
$71,282
$88,281
$105,279
$118,878
Tennessee
60-79.99
69.0
$29,527
$34,387
$44,106
$53,825
$63,544
$73,263
$87,842
$97,561
$102,421
$126,718
$151,016
$170,454
1-247

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$30,524
$36,055
$47,118
$58,181
$69,244
$80,307
$96,901
$107,964
$113,496
$141,153
$168,810
$190,936
Tennessee
100 <
145.0
$45,763
$54,535
$72,077
$89,619
$107,162
$124,704
$151,018
$168,561
$177,332
$221,188
$265,044
$300,129
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$8,919
$10,013
$12,199
$14,385
$16,572
$18,758
$22,038
$24,224
$25,318
$30,784
$36,250
$40,623
Texas
15-19.99
17.0
$9,944
$11,185
$13,665
$16,146
$18,627
$21,108
$24,829
$27,310
$28,550
$34,752
$40,954
$45,916
Texas
20-29.99
23.0
$16,813
$18,730
$22,564
$26,398
$30,232
$34,066
$39,817
$43,651
$45,568
$55,153
$64,738
$72,406
Texas
30-39.99
34.0
$18,790
$21,031
$25,512
$29,994
$34,475
$38,957
$45,679
$50,161
$52,402
$63,606
$74,810
$83,773
Texas
40-59.99
46.0
$19,721
$22,555
$28,223
$33,891
$39,559
$45,228
$53,730
$59,398
$62,232
$76,402
$90,572
$101,908
Texas
60-79.99
69.0
$28,679
$32,690
$40,712
$48,734
$56,756
$64,778
$76,811
$84,833
$88,845
$108,900
$128,955
$144,999
Texas
80-99.99
85.1
$29,477
$33,962
$42,932
$51,902
$60,872
$69,842
$83,297
$92,267
$96,752
$119,177
$141,601
$159,541
Texas
100 <
145.0
$43,980
$50,968
$64,945
$78,921
$92,897
$106,873
$127,838
$141,814
$148,802
$183,743
$218,684
$246,636
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$8,377
$9,275
$11,072
$12,868
$14,664
$16,460
$19,155
$20,951
$21,849
$26,339
$30,830
$34,422
Utah
15-19.99
17.0
$9,025
$9,989
$11,917
$13,845
$15,773
$17,701
$20,593
$22,521
$23,485
$28,304
$33,124
$36,980
Utah
20-29.99
23.0
$15,745
$17,288
$20,374
$23,460
$26,546
$29,632
$34,261
$37,347
$38,890
$46,606
$54,321
$60,493
Utah
30-39.99
34.0
$16,951
$18,639
$22,015
$25,391
$28,767
$32,143
$37,207
$40,583
$42,271
$50,710
$59,150
$65,902
Utah
40-59.99
46.0
$17,687
$19,773
$23,946
$28,118
$32,290
$36,462
$42,720
$46,893
$48,979
$59,409
$69,839
$78,184
Utah
60-79.99
69.0
$25,628
$28,517
$34,295
$40,074
$45,852
$51,630
$60,297
$66,076
$68,965
$83,411
$97,856
$109,413
Utah
80-99.99
85.1
$28,094
$31,195
$37,398
$43,600
$49,803
$56,005
$65,309
$71,511
$74,613
$90,119
$105,625
$118,030
Utah
100 <
145.0
$37,863
$42,493
$51,754
$61,015
$70,276
$79,537
$93,428
$102,689
$107,320
$130,472
$153,625
$172,147
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$8,935
$10,045
$12,263
$14,482
$16,701
$18,919
$22,247
$24,466
$25,575
$31,122
$36,668
$41,106
Vermont
15-19.99
17.0
$9,967
$11,230
$13,756
$16,283
$18,809
$21,336
$25,125
$27,652
$28,915
$35,231
$41,547
$46,600
Vermont
20-29.99
23.0
$16,844
$18,791
$22,687
$26,583
$30,479
$34,374
$40,218
$44,114
$46,061
$55,801
$65,540
$73,331
1-248

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$18,835
$21,122
$25,694
$30,267
$34,840
$39,413
$46,272
$50,845
$53,131
$64,563
$75,995
$85,141
Vermont
40-59.99
46.0
$19,783
$22,679
$28,470
$34,261
$40,053
$45,844
$54,531
$60,323
$63,219
$77,697
$92,176
$103,758
Vermont
60-79.99
69.0
$28,771
$32,875
$41,082
$49,289
$57,496
$65,703
$78,014
$86,221
$90,325
$110,843
$131,360
$147,775
Vermont
80-99.99
85.1
$29,592
$34,191
$43,389
$52,587
$61,785
$70,983
$84,780
$93,978
$98,577
$121,573
$144,568
$162,964
Vermont
100 <
145.0
$44,175
$51,357
$65,722
$80,087
$94,453
$108,818
$130,365
$144,730
$151,913
$187,826
$223,739
$252,469
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$9,004
$10,183
$12,539
$14,896
$17,252
$19,609
$23,144
$25,500
$26,678
$32,570
$38,461
$43,174
Virginia
15-19.99
17.0
$10,065
$11,425
$14,147
$16,869
$19,591
$22,312
$26,395
$29,117
$30,478
$37,282
$44,086
$49,530
Virginia
20-29.99
23.0
$16,976
$19,056
$23,216
$27,376
$31,536
$35,696
$41,936
$46,096
$48,176
$58,576
$68,976
$77,296
Virginia
30-39.99
34.0
$19,031
$21,512
$26,476
$31,439
$36,403
$41,366
$48,812
$53,775
$56,257
$68,666
$81,074
$91,001
Virginia
40-59.99
46.0
$20,047
$23,207
$29,527
$35,847
$42,167
$48,487
$57,967
$64,287
$67,447
$83,248
$99,048
$111,688
Virginia
60-79.99
69.0
$29,168
$33,668
$42,668
$51,668
$60,668
$69,668
$83,168
$92,168
$96,668
$119,168
$141,668
$159,668
Virginia
80-99.99
85.1
$30,081
$35,169
$45,345
$55,521
$65,697
$75,873
$91,137
$101,313
$106,401
$131,841
$157,281
$177,633
Virginia
100 <
145.0
$45,008
$53,023
$69,055
$85,086
$101,118
$117,149
$141,196
$157,228
$165,243
$205,322
$245,400
$277,463
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$8,949
$10,072
$12,318
$14,564
$16,810
$19,056
$22,425
$24,671
$25,794
$31,409
$37,023
$41,515
Washington
15-19.99
17.0
$9,986
$11,269
$13,834
$16,399
$18,964
$21,529
$25,377
$27,942
$29,224
$35,637
$42,050
$47,180
Washington
20-29.99
23.0
$16,870
$18,844
$22,792
$26,740
$30,688
$34,636
$40,558
$44,506
$46,480
$56,350
$66,221
$74,117
Washington
30-39.99
34.0
$18,874
$21,199
$25,849
$30,499
$35,150
$39,800
$46,775
$51,425
$53,750
$65,376
$77,001
$86,302
Washington
40-59.99
46.0
$19,835
$22,783
$28,679
$34,576
$40,472
$46,368
$55,212
$61,108
$64,056
$78,797
$93,537
$105,329
Washington
60-79.99
69.0
$28,850
$33,032
$41,396
$49,760
$58,125
$66,489
$79,035
$87,399
$91,581
$112,492
$133,402
$150,131
Washington
80-99.99
85.1
$29,688
$34,384
$43,776
$53,168
$62,560
$71,952
$86,039
$95,431
$100,127
$123,607
$147,086
$165,870
Washington
100 <
145.0
$44,340
$51,687
$66,382
$81,078
$95,773
$110,468
$132,511
$147,206
$154,554
$191,292
$228,030
$257,420
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-249

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - RESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$9,031
$10,236
$12,647
$15,057
$17,467
$19,877
$23,492
$25,903
$27,108
$33,133
$39,159
$43,979
West Virginia
15-19.99
17.0
$10,103
$11,501
$14,299
$17,097
$19,895
$22,693
$26,889
$29,687
$31,086
$38,081
$45,075
$50,671
West Virginia
20-29.99
23.0
$17,027
$19,159
$23,421
$27,684
$31,947
$36,210
$42,605
$46,867
$48,999
$59,656
$70,313
$78,839
West Virginia
30-39.99
34.0
$19,107
$21,664
$26,780
$31,896
$37,011
$42,127
$49,800
$54,916
$57,474
$70,263
$83,052
$93,283
West Virginia
40-59.99
46.0
$20,150
$23,413
$29,939
$36,465
$42,990
$49,516
$59,305
$65,831
$69,094
$85,408
$101,723
$114,774
West Virginia
60-79.99
69.0
$29,322
$33,976
$43,285
$52,594
$61,903
$71,211
$85,174
$94,483
$99,137
$122,409
$145,681
$164,298
West Virginia
80-99.99
85.1
$30,271
$35,549
$46,106
$56,663
$67,219
$77,776
$93,611
$104,168
$109,446
$135,838
$162,230
$183,343
West Virginia
100 <
145.0
$45,332
$53,672
$70,352
$87,032
$103,712
$120,392
$145,412
$162,092
$170,432
$212,132
$253,832
$287,192
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$8,908
$9,990
$12,153
$14,317
$16,481
$18,644
$21,890
$24,053
$25,135
$30,544
$35,953
$40,280
Wisconsin
15-19.99
17.0
$9,928
$11,152
$13,601
$16,049
$18,498
$20,946
$24,619
$27,067
$28,291
$34,412
$40,534
$45,430
Wisconsin
20-29.99
23.0
$16,791
$18,686
$22,476
$26,266
$30,057
$33,847
$39,532
$43,323
$45,218
$54,693
$64,169
$71,750
Wisconsin
30-39.99
34.0
$18,757
$20,966
$25,383
$29,800
$34,217
$38,633
$45,259
$49,676
$51,884
$62,926
$73,969
$82,802
Wisconsin
40-59.99
46.0
$19,677
$22,468
$28,048
$33,629
$39,209
$44,790
$53,161
$58,741
$61,531
$75,483
$89,434
$100,595
Wisconsin
60-79.99
69.0
$28,613
$32,559
$40,449
$48,340
$56,231
$64,122
$75,958
$83,849
$87,794
$107,521
$127,248
$143,029
Wisconsin
80-99.99
85.1
$29,396
$33,800
$42,608
$51,416
$60,224
$69,032
$82,244
$91,052
$95,456
$117,476
$139,496
$157,112
Wisconsin
100 <
145.0
$43,842
$50,692
$64,393
$78,093
$91,793
$105,494
$126,044
$139,745
$146,595
$180,846
$215,096
$242,497
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$8,726
$9,626
$11,426
$13,226
$15,026
$16,826
$19,527
$21,327
$22,227
$26,727
$31,227
$34,827
Wyoming
15-19.99
17.0
$9,027
$9,994
$11,928
$13,861
$15,794
$17,728
$20,628
$22,562
$23,528
$28,362
$33,195
$37,062
Wyoming
20-29.99
23.0
$16,442
$17,989
$21,083
$24,176
$27,270
$30,363
$35,003
$38,097
$39,644
$47,377
$55,111
$61,298
Wyoming
30-39.99
34.0
$16,956
$18,650
$22,037
$25,424
$28,810
$32,197
$37,278
$40,665
$42,358
$50,825
$59,292
$66,066
Wyoming
40-59.99
46.0
$18,981
$21,074
$25,261
$29,448
$33,635
$37,822
$44,103
$48,289
$50,383
$60,850
$71,318
$79,692
Wyoming
60-79.99
69.0
$27,568
$30,468
$36,269
$42,069
$47,870
$53,670
$62,371
$68,171
$71,071
$85,573
$100,074
$111,675
Wyoming
80-99.99
85.1
$28,107
$31,222
$37,452
$43,682
$49,912
$56,142
$65,487
$71,717
$74,832
$90,406
$105,981
$118,441
Wyoming
100 <
145.0
$41,646
$46,300
$55,607
$64,915
$74,223
$83,530
$97,492
$106,799
$111,453
$134,722
$157,991
$176,606
1-250

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$9,099
$10,371
$12,917
$15,462
$18,007
$20,552
$24,370
$26,915
$28,188
$34,551
$40,914
$46,005
Alabama
15-19.99
17.0
$10,198
$11,693
$14,682
$17,671
$20,660
$23,649
$28,133
$31,122
$32,616
$40,089
$47,562
$53,540
Alabama
20-29.99
23.0
$17,157
$19,417
$23,939
$28,461
$32,982
$37,504
$44,287
$48,808
$51,069
$62,374
$73,678
$82,721
Alabama
30-39.99
34.0
$19,298
$22,047
$27,545
$33,043
$38,542
$44,040
$52,287
$57,785
$60,534
$74,280
$88,025
$99,021
Alabama
40-59.99
46.0
$20,409
$23,931
$30,974
$38,017
$45,061
$52,104
$62,669
$69,713
$73,234
$90,843
$108,451
$122,538
Alabama
60-79.99
69.0
$29,710
$34,753
$44,838
$54,923
$65,008
$75,093
$90,221
$100,306
$105,349
$130,561
$155,774
$175,944
Alabama
80-99.99
85.1
$30,750
$36,507
$48,021
$59,535
$71,050
$82,564
$99,835
$111,350
$117,107
$145,892
$174,678
$197,707
Alabama
100 <
145.0
$46,148
$55,304
$73,615
$91,927
$110,238
$128,550
$156,017
$174,329
$183,485
$229,264
$275,043
$311,666
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$8,949
$10,072
$12,318
$14,564
$16,810
$19,056
$22,425
$24,671
$25,794
$31,409
$37,023
$41,515
Alaska
15-19.99
17.0
$9,986
$11,269
$13,834
$16,399
$18,964
$21,529
$25,377
$27,942
$29,224
$35,637
$42,050
$47,180
Alaska
20-29.99
23.0
$16,870
$18,844
$22,792
$26,740
$30,688
$34,636
$40,558
$44,506
$46,480
$56,350
$66,221
$74,117
Alaska
30-39.99
34.0
$18,874
$21,199
$25,849
$30,499
$35,150
$39,800
$46,775
$51,425
$53,750
$65,376
$77,001
$86,302
Alaska
40-59.99
46.0
$19,835
$22,783
$28,679
$34,576
$40,472
$46,368
$55,212
$61,108
$64,056
$78,797
$93,537
$105,329
Alaska
60-79.99
69.0
$28,850
$33,032
$41,396
$49,760
$58,125
$66,489
$79,035
$87,399
$91,581
$112,492
$133,402
$150,131
Alaska
80-99.99
85.1
$29,688
$34,384
$43,776
$53,168
$62,560
$71,952
$86,039
$95,431
$100,127
$123,607
$147,086
$165,870
Alaska
100 <
145.0
$44,340
$51,687
$66,382
$81,078
$95,773
$110,468
$132,511
$147,206
$154,554
$191,292
$228,030
$257,420
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$8,303
$9,127
$10,775
$12,423
$14,072
$15,720
$18,192
$19,840
$20,664
$24,784
$28,905
$32,201
Arizona
15-19.99
17.0
$8,920
$9,779
$11,497
$13,215
$14,933
$16,651
$19,229
$20,947
$21,806
$26,101
$30,397
$33,833
Arizona
20-29.99
23.0
$15,603
$17,004
$19,806
$22,608
$25,411
$28,213
$32,416
$35,218
$36,619
$43,625
$50,630
$56,235
Arizona
30-39.99
34.0
$16,741
$18,219
$21,176
$24,132
$27,088
$30,044
$34,479
$37,435
$38,913
$46,304
$53,695
$59,608
1-251

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$17,403
$19,206
$22,810
$26,414
$30,019
$33,623
$39,030
$42,634
$44,437
$53,448
$62,459
$69,668
Arizona
60-79.99
69.0
$25,202
$27,665
$32,592
$37,519
$42,445
$47,372
$54,762
$59,689
$62,152
$74,468
$86,785
$96,638
Arizona
80-99.99
85.1
$27,569
$30,145
$35,297
$40,449
$45,601
$50,753
$58,482
$63,634
$66,210
$79,090
$91,971
$102,275
Arizona
100 <
145.0
$36,968
$40,703
$48,175
$55,646
$63,117
$70,589
$81,796
$89,267
$93,003
$111,681
$130,359
$145,302
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$9,083
$10,340
$12,855
$15,369
$17,884
$20,398
$24,170
$26,684
$27,941
$34,227
$40,513
$45,542
Arkansas
15-19.99
17.0
$10,176
$11,649
$14,594
$17,540
$20,485
$23,430
$27,849
$30,794
$32,267
$39,630
$46,993
$52,884
Arkansas
20-29.99
23.0
$17,127
$19,358
$23,821
$28,283
$32,746
$37,208
$43,902
$48,365
$50,596
$61,752
$72,909
$81,834
Arkansas
30-39.99
34.0
$19,254
$21,960
$27,370
$32,781
$38,192
$43,602
$51,719
$57,129
$59,835
$73,361
$86,888
$97,710
Arkansas
40-59.99
46.0
$20,350
$23,812
$30,737
$37,662
$44,588
$51,513
$61,900
$68,825
$72,288
$89,601
$106,913
$120,764
Arkansas
60-79.99
69.0
$29,622
$34,575
$44,483
$54,391
$64,298
$74,206
$89,067
$98,975
$103,929
$128,698
$153,467
$173,282
Arkansas
80-99.99
85.1
$30,640
$36,288
$47,583
$58,879
$70,174
$81,470
$98,413
$109,708
$115,356
$143,594
$171,833
$194,424
Arkansas
100 <
145.0
$45,961
$54,931
$72,869
$90,808
$108,747
$126,685
$153,593
$171,532
$180,501
$225,348
$270,195
$306,072
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$8,766
$9,706
$11,585
$13,465
$15,344
$17,224
$20,043
$21,922
$22,862
$27,561
$32,260
$36,019
California
15-19.99
17.0
$9,727
$10,750
$12,796
$14,842
$16,888
$18,934
$22,003
$24,049
$25,072
$30,186
$35,301
$39,393
California
20-29.99
23.0
$16,519
$18,141
$21,387
$24,633
$27,879
$31,124
$35,993
$39,239
$40,862
$48,976
$57,090
$63,582
California
30-39.99
34.0
$18,355
$20,161
$23,773
$27,385
$30,997
$34,609
$40,027
$43,639
$45,445
$54,474
$63,504
$70,728
California
40-59.99
46.0
$19,133
$21,379
$25,870
$30,362
$34,853
$39,345
$46,082
$50,573
$52,819
$64,048
$75,276
$84,259
California
60-79.99
69.0
$27,796
$30,925
$37,182
$43,439
$49,697
$55,954
$65,340
$71,597
$74,725
$90,368
$106,011
$118,526
California
80-99.99
85.1
$28,389
$31,786
$38,579
$45,372
$52,165
$58,959
$69,148
$75,942
$79,338
$96,321
$113,304
$126,891
California
100 <
145.0
$42,126
$47,260
$57,527
$67,794
$78,062
$88,329
$103,730
$113,998
$119,132
$144,800
$170,469
$191,004
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$8,711
$9,595
$11,364
$13,133
$14,902
$16,671
$19,325
$21,094
$21,979
$26,401
$30,824
$34,362
1-252

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$9,648
$10,593
$12,483
$14,372
$16,262
$18,151
$20,986
$22,875
$23,820
$28,544
$33,267
$37,047
Colorado
20-29.99
23.0
$16,413
$17,930
$20,964
$23,998
$27,032
$30,066
$34,617
$37,651
$39,168
$46,753
$54,338
$60,407
Colorado
30-39.99
34.0
$18,198
$19,848
$23,147
$26,446
$29,745
$33,044
$37,993
$41,292
$42,941
$51,189
$59,436
$66,035
Colorado
40-59.99
46.0
$18,921
$20,955
$25,023
$29,092
$33,160
$37,228
$43,330
$47,398
$49,432
$59,602
$69,773
$77,909
Colorado
60-79.99
69.0
$27,479
$30,290
$35,912
$41,534
$47,157
$52,779
$61,212
$66,834
$69,645
$83,701
$97,756
$109,000
Colorado
80-99.99
85.1
$27,998
$31,003
$37,013
$43,023
$49,033
$55,043
$64,058
$70,068
$73,073
$88,098
$103,123
$115,143
Colorado
100 <
145.0
$41,459
$45,925
$54,858
$63,791
$72,724
$81,657
$95,056
$103,989
$108,456
$130,788
$153,121
$170,987
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$9,048
$10,271
$12,716
$15,160
$17,605
$20,050
$23,717
$26,162
$27,384
$33,496
$39,608
$44,498
Connecticut
15-19.99
17.0
$10,127
$11,550
$14,397
$17,244
$20,091
$22,937
$27,208
$30,054
$31,478
$38,595
$45,712
$51,405
Connecticut
20-29.99
23.0
$17,060
$19,225
$23,554
$27,883
$32,212
$36,541
$43,035
$47,364
$49,529
$60,352
$71,175
$79,833
Connecticut
30-39.99
34.0
$19,156
$21,762
$26,976
$32,189
$37,403
$42,616
$50,437
$55,650
$58,257
$71,291
$84,325
$94,752
Connecticut
40-59.99
46.0
$20,216
$23,545
$30,204
$36,862
$43,520
$50,179
$60,166
$66,824
$70,153
$86,799
$103,445
$116,761
Connecticut
60-79.99
69.0
$29,422
$34,175
$43,683
$53,190
$62,698
$72,205
$86,466
$95,974
$100,727
$124,496
$148,264
$167,279
Connecticut
80-99.99
85.1
$30,393
$35,794
$46,596
$57,398
$68,200
$79,002
$95,204
$106,006
$111,407
$138,412
$165,416
$187,020
Connecticut
100 <
145.0
$45,541
$54,090
$71,187
$88,285
$105,383
$122,480
$148,127
$165,224
$173,773
$216,517
$259,261
$293,457
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$9,033
$10,241
$12,655
$15,070
$17,484
$19,899
$23,521
$25,935
$27,142
$33,179
$39,215
$44,044
Delaware
15-19.99
17.0
$10,106
$11,508
$14,312
$17,115
$19,919
$22,723
$26,929
$29,733
$31,135
$38,145
$45,155
$50,763
Delaware
20-29.99
23.0
$17,031
$19,167
$23,438
$27,709
$31,980
$36,252
$42,658
$46,930
$49,065
$59,743
$70,421
$78,964
Delaware
30-39.99
34.0
$19,113
$21,677
$26,805
$31,932
$37,060
$42,188
$49,880
$55,008
$57,572
$70,391
$83,211
$93,467
Delaware
40-59.99
46.0
$20,158
$23,430
$29,972
$36,514
$43,057
$49,599
$59,413
$65,955
$69,226
$85,582
$101,938
$115,023
Delaware
60-79.99
69.0
$29,335
$34,001
$43,335
$52,669
$62,002
$71,336
$85,336
$94,670
$99,336
$122,670
$146,004
$164,671
Delaware
80-99.99
85.1
$30,286
$35,580
$46,167
$56,755
$67,342
$77,930
$93,811
$104,398
$109,692
$136,160
$162,629
$183,804
Delaware
100 <
145.0
$45,358
$53,724
$70,457
$87,189
$103,921
$120,654
$145,752
$162,484
$170,850
$212,681
$254,512
$287,977
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-253

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$9,025
$10,225
$12,623
$15,022
$17,420
$19,819
$23,416
$25,815
$27,014
$33,010
$39,006
$43,803
District of
Columbia
15-19.99
17.0
$10,094
$11,485
$14,266
$17,047
$19,828
$22,610
$26,781
$29,563
$30,953
$37,906
$44,859
$50,422
District of
Columbia
20-29.99
23.0
$17,016
$19,136
$23,377
$27,617
$31,857
$36,098
$42,459
$46,699
$48,819
$59,420
$70,021
$78,502
District of
Columbia
30-39.99
34.0
$19,090
$21,631
$26,714
$31,796
$36,878
$41,961
$49,584
$54,667
$57,208
$69,914
$82,620
$92,785
District of
Columbia
40-59.99
46.0
$20,128
$23,368
$29,849
$36,330
$42,811
$49,292
$59,013
$65,494
$68,734
$84,936
$101,139
$114,100
District of
Columbia
60-79.99
69.0
$29,288
$33,909
$43,150
$52,392
$61,633
$70,874
$84,736
$93,978
$98,598
$121,702
$144,805
$163,288
District of
Columbia
80-99.99
85.1
$30,229
$35,466
$45,940
$56,413
$66,887
$77,361
$93,071
$103,545
$108,781
$134,966
$161,150
$182,097
District of
Columbia
100 <
145.0
$45,261
$53,531
$70,069
$86,607
$103,146
$119,684
$144,492
$161,030
$169,299
$210,645
$251,991
$285,068
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$9,240
$10,653
$13,480
$16,307
$19,134
$21,961
$26,202
$29,029
$30,443
$37,510
$44,578
$50,232
Florida
15-19.99
17.0
$10,398
$12,092
$15,480
$18,869
$22,257
$25,645
$30,728
$34,116
$35,810
$44,281
$52,752
$59,529
Florida
20-29.99
23.0
$17,427
$19,958
$25,019
$30,081
$35,143
$40,205
$47,798
$52,860
$55,391
$68,045
$80,700
$90,824
Florida
30-39.99
34.0
$19,697
$22,846
$29,142
$35,439
$41,736
$48,032
$57,477
$63,774
$66,922
$82,664
$98,405
$110,999
Florida
40-59.99
46.0
$20,949
$25,011
$33,135
$41,258
$49,382
$57,506
$69,691
$77,815
$81,877
$102,186
$122,496
$138,743
Florida
60-79.99
69.0
$30,521
$36,373
$48,079
$59,785
$71,490
$83,196
$100,754
$112,460
$118,312
$147,576
$176,840
$200,251
Florida
80-99.99
85.1
$31,749
$38,505
$52,018
$65,531
$79,044
$92,557
$112,826
$126,339
$133,096
$166,878
$200,660
$227,686
Florida
100 <
145.0
$47,851
$58,709
$80,426
$102,143
$123,860
$145,577
$178,152
$199,869
$210,728
$265,020
$319,312
$362,746
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$9,118
$10,411
$12,996
$15,580
$18,165
$20,750
$24,627
$27,211
$28,504
$34,965
$41,427
$46,597
1-254

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$10,226
$11,749
$14,794
$17,839
$20,884
$23,929
$28,496
$31,541
$33,064
$40,676
$48,289
$54,379
Georgia
20-29.99
23.0
$17,194
$19,493
$24,090
$28,688
$33,285
$37,882
$44,778
$49,376
$51,674
$63,168
$74,661
$83,856
Georgia
30-39.99
34.0
$19,354
$22,159
$27,769
$33,379
$38,989
$44,599
$53,014
$58,624
$61,429
$75,454
$89,479
$100,699
Georgia
40-59.99
46.0
$20,485
$24,082
$31,277
$38,471
$45,666
$52,861
$63,653
$70,847
$74,445
$92,432
$110,418
$124,808
Georgia
60-79.99
69.0
$29,824
$34,980
$45,292
$55,604
$65,916
$76,228
$91,696
$102,008
$107,164
$132,944
$158,724
$179,349
Georgia
80-99.99
85.1
$30,890
$36,787
$48,581
$60,375
$72,169
$83,963
$101,655
$113,449
$119,346
$148,832
$178,317
$201,905
Georgia
100 <
145.0
$46,386
$55,781
$74,569
$93,358
$112,146
$130,935
$159,117
$177,906
$187,300
$234,271
$281,243
$318,820
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$8,765
$9,703
$11,581
$13,458
$15,335
$17,213
$20,029
$21,906
$22,844
$27,538
$32,231
$35,986
Hawaii
15-19.99
17.0
$9,725
$10,747
$12,789
$14,832
$16,875
$18,918
$21,982
$24,025
$25,046
$30,153
$35,261
$39,346
Hawaii
20-29.99
23.0
$16,516
$18,137
$21,379
$24,620
$27,862
$31,103
$35,965
$39,207
$40,828
$48,931
$57,035
$63,518
Hawaii
30-39.99
34.0
$18,352
$20,155
$23,760
$27,366
$30,972
$34,577
$39,986
$43,591
$45,394
$54,408
$63,423
$70,634
Hawaii
40-59.99
46.0
$19,129
$21,370
$25,853
$30,336
$34,819
$39,302
$46,026
$50,509
$52,751
$63,958
$75,166
$84,132
Hawaii
60-79.99
69.0
$27,790
$30,912
$37,157
$43,401
$49,646
$55,890
$65,257
$71,501
$74,623
$90,234
$105,846
$118,334
Hawaii
80-99.99
85.1
$28,381
$31,770
$38,547
$45,325
$52,102
$58,880
$69,046
$75,824
$79,212
$96,156
$113,100
$126,655
Hawaii
100 <
145.0
$42,112
$47,233
$57,473
$67,714
$77,955
$88,195
$103,556
$113,797
$118,917
$144,519
$170,120
$190,602
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$8,342
$9,205
$10,932
$12,658
$14,384
$16,110
$18,699
$20,426
$21,289
$25,604
$29,920
$33,372
Idaho
15-19.99
17.0
$8,628
$9,542
$11,371
$13,200
$15,029
$16,858
$19,601
$21,430
$22,344
$26,916
$31,488
$35,146
Idaho
20-29.99
23.0
$15,402
$16,878
$19,829
$22,781
$25,733
$28,685
$33,113
$36,065
$37,541
$44,921
$52,300
$58,204
Idaho
30-39.99
34.0
$16,158
$17,746
$20,924
$24,102
$27,279
$30,457
$35,223
$38,401
$39,990
$47,934
$55,878
$62,233
Idaho
40-59.99
46.0
$17,553
$19,505
$23,409
$27,313
$31,216
$35,120
$40,976
$44,880
$46,832
$56,591
$66,351
$74,158
Idaho
60-79.99
69.0
$25,427
$28,114
$33,490
$38,866
$44,242
$49,617
$57,681
$63,056
$65,744
$79,184
$92,623
$103,374
Idaho
80-99.99
85.1
$25,917
$28,770
$34,476
$40,182
$45,888
$51,594
$60,153
$65,859
$68,712
$82,977
$97,242
$108,654
Idaho
100 <
145.0
$34,868
$39,075
$47,490
$55,905
$64,320
$72,735
$85,358
$93,773
$97,980
$119,018
$140,055
$156,885
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-255

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$8,925
$10,024
$12,222
$14,419
$16,617
$18,815
$22,112
$24,309
$25,408
$30,903
$36,397
$40,793
Illinois
15-19.99
17.0
$9,952
$11,201
$13,697
$16,194
$18,691
$21,188
$24,933
$27,430
$28,679
$34,921
$41,163
$46,156
Illinois
20-29.99
23.0
$16,824
$18,751
$22,607
$26,463
$30,319
$34,174
$39,958
$43,814
$45,742
$55,381
$65,020
$72,732
Illinois
30-39.99
34.0
$18,806
$21,063
$25,576
$30,090
$34,604
$39,117
$45,888
$50,402
$52,659
$63,943
$75,227
$84,254
Illinois
40-59.99
46.0
$19,743
$22,599
$28,310
$34,022
$39,733
$45,445
$54,012
$59,723
$62,579
$76,858
$91,136
$102,559
Illinois
60-79.99
69.0
$28,711
$32,755
$40,842
$48,929
$57,017
$65,104
$77,235
$85,322
$89,366
$109,584
$129,802
$145,976
Illinois
80-99.99
85.1
$29,518
$34,043
$43,093
$52,143
$61,193
$70,244
$83,819
$92,869
$97,394
$120,020
$142,646
$160,746
Illinois
100 <
145.0
$44,049
$51,105
$65,218
$79,332
$93,445
$107,558
$128,727
$142,841
$149,897
$185,180
$220,463
$248,689
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$8,997
$10,168
$12,510
$14,852
$17,194
$19,536
$23,049
$25,392
$26,563
$32,418
$38,273
$42,957
Indiana
15-19.99
17.0
$10,054
$11,405
$14,106
$16,807
$19,509
$22,210
$26,262
$28,963
$30,314
$37,067
$43,820
$49,222
Indiana
20-29.99
23.0
$16,962
$19,028
$23,160
$27,293
$31,425
$35,557
$41,755
$45,888
$47,954
$58,285
$68,615
$76,880
Indiana
30-39.99
34.0
$19,010
$21,471
$26,394
$31,316
$36,239
$41,161
$48,545
$53,468
$55,929
$68,235
$80,541
$90,386
Indiana
40-59.99
46.0
$20,019
$23,152
$29,416
$35,681
$41,945
$48,210
$57,607
$63,871
$67,004
$82,665
$98,326
$110,855
Indiana
60-79.99
69.0
$29,126
$33,585
$42,501
$51,418
$60,335
$69,252
$82,627
$91,544
$96,002
$118,294
$140,587
$158,420
Indiana
80-99.99
85.1
$30,029
$35,066
$45,139
$55,213
$65,286
$75,360
$90,470
$100,543
$105,580
$130,763
$155,947
$176,094
Indiana
100 <
145.0
$44,920
$52,849
$68,705
$84,562
$100,418
$116,275
$140,059
$155,916
$163,844
$203,486
$243,127
$274,840
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$8,910
$9,994
$12,162
$14,329
$16,497
$18,665
$21,917
$24,084
$25,168
$30,588
$36,007
$40,343
Iowa
15-19.99
17.0
$9,931
$11,158
$13,612
$16,067
$18,521
$20,975
$24,657
$27,111
$28,339
$34,474
$40,610
$45,519
Iowa
20-29.99
23.0
$16,795
$18,694
$22,492
$26,290
$30,089
$33,887
$39,584
$43,383
$45,282
$54,777
$64,273
$71,869
Iowa
30-39.99
34.0
$18,763
$20,978
$25,406
$29,835
$34,264
$38,692
$45,336
$49,764
$51,979
$63,050
$74,122
$82,980
Iowa
40-59.99
46.0
$19,685
$22,484
$28,080
$33,677
$39,273
$44,870
$53,264
$58,861
$61,659
$75,650
$89,642
$100,835
Iowa
60-79.99
69.0
$28,625
$32,583
$40,497
$48,412
$56,327
$64,242
$76,114
$84,028
$87,986
$107,773
$127,559
$143,389
Iowa
80-99.99
85.1
$29,411
$33,830
$42,668
$51,505
$60,343
$69,180
$82,436
$91,274
$95,693
$117,786
$139,880
$157,555
1-256

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$43,867
$50,743
$64,493
$78,244
$91,995
$105,746
$126,372
$140,122
$146,998
$181,374
$215,751
$243,252
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$8,965
$10,103
$12,380
$14,657
$16,934
$19,211
$22,626
$24,903
$26,041
$31,733
$37,426
$41,979
Kansas
15-19.99
17.0
$10,008
$11,313
$13,922
$16,530
$19,139
$21,748
$25,662
$28,271
$29,575
$36,097
$42,620
$47,838
Kansas
20-29.99
23.0
$16,899
$18,903
$22,910
$26,918
$30,925
$34,933
$40,944
$44,951
$46,955
$56,973
$66,991
$75,006
Kansas
30-39.99
34.0
$18,918
$21,287
$26,025
$30,762
$35,500
$40,238
$47,345
$52,083
$54,452
$66,296
$78,141
$87,617
Kansas
40-59.99
46.0
$19,895
$22,902
$28,917
$34,931
$40,946
$46,961
$55,983
$61,998
$65,005
$80,042
$95,079
$107,108
Kansas
60-79.99
69.0
$28,939
$33,210
$41,752
$50,294
$58,836
$67,378
$80,191
$88,734
$93,005
$114,360
$135,715
$152,799
Kansas
80-99.99
85.1
$29,798
$34,604
$44,215
$53,826
$63,438
$73,049
$87,466
$97,077
$101,883
$125,911
$149,939
$169,161
Kansas
100 <
145.0
$44,527
$52,061
$67,130
$82,199
$97,268
$112,337
$134,941
$150,010
$157,545
$195,217
$232,890
$263,028
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$9,055
$10,284
$12,742
$15,199
$17,657
$20,115
$23,802
$26,259
$27,488
$33,633
$39,777
$44,693
Kentucky
15-19.99
17.0
$10,136
$11,569
$14,434
$17,299
$20,164
$23,030
$27,327
$30,193
$31,625
$38,788
$45,951
$51,681
Kentucky
20-29.99
23.0
$17,073
$19,250
$23,604
$27,958
$32,312
$36,666
$43,197
$47,551
$49,728
$60,613
$71,499
$80,207
Kentucky
30-39.99
34.0
$19,174
$21,799
$27,050
$32,300
$37,550
$42,801
$50,676
$55,927
$58,552
$71,678
$84,804
$95,304
Kentucky
40-59.99
46.0
$20,241
$23,595
$30,304
$37,012
$43,720
$50,428
$60,490
$67,198
$70,552
$87,323
$104,093
$117,509
Kentucky
60-79.99
69.0
$29,459
$34,250
$43,832
$53,414
$62,997
$72,579
$86,952
$96,535
$101,326
$125,281
$149,237
$168,401
Kentucky
80-99.99
85.1
$30,440
$35,887
$46,781
$57,675
$68,569
$79,463
$95,804
$106,698
$112,145
$139,380
$166,616
$188,404
Kentucky
100 <
145.0
$45,620
$54,247
$71,502
$88,757
$106,011
$123,266
$149,148
$166,403
$175,031
$218,168
$261,305
$295,814
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$9,204
$10,583
$13,339
$16,096
$18,853
$21,609
$25,744
$28,501
$29,879
$36,771
$43,663
$49,176
Louisiana
15-19.99
17.0
$10,348
$11,992
$15,281
$18,570
$21,858
$25,147
$30,080
$33,368
$35,013
$43,234
$51,456
$58,033
Louisiana
20-29.99
23.0
$17,359
$19,823
$24,750
$29,677
$34,604
$39,530
$46,921
$51,848
$54,311
$66,629
$78,946
$88,800
Louisiana
30-39.99
34.0
$19,598
$22,646
$28,743
$34,841
$40,938
$47,035
$56,181
$62,278
$65,327
$80,570
$95,813
$108,007
1-257

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$20,814
$24,741
$32,595
$40,449
$48,303
$56,157
$67,938
$75,792
$79,718
$99,353
$118,988
$134,696
Louisiana
60-79.99
69.0
$30,318
$35,969
$47,270
$58,570
$69,871
$81,172
$98,123
$109,424
$115,075
$143,327
$171,579
$194,181
Louisiana
80-99.99
85.1
$31,499
$38,006
$51,020
$64,034
$77,047
$90,061
$109,582
$122,596
$129,102
$161,637
$194,171
$220,199
Louisiana
100 <
145.0
$47,425
$57,859
$78,725
$99,591
$120,458
$141,324
$172,624
$193,491
$203,924
$256,090
$308,256
$349,989
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$9,019
$10,211
$12,596
$14,981
$17,366
$19,751
$23,329
$25,714
$26,907
$32,869
$38,832
$43,602
Maine
15-19.99
17.0
$10,085
$11,466
$14,228
$16,990
$19,752
$22,515
$26,658
$29,420
$30,801
$37,707
$44,612
$50,137
Maine
20-29.99
23.0
$17,003
$19,110
$23,325
$27,540
$31,755
$35,969
$42,291
$46,506
$48,614
$59,150
$69,687
$78,117
Maine
30-39.99
34.0
$19,071
$21,593
$26,638
$31,682
$36,726
$41,771
$49,337
$54,382
$56,904
$69,515
$82,126
$92,215
Maine
40-59.99
46.0
$20,102
$23,317
$29,746
$36,176
$42,605
$49,034
$58,679
$65,108
$68,323
$84,396
$100,470
$113,329
Maine
60-79.99
69.0
$29,250
$33,832
$42,996
$52,160
$61,325
$70,489
$84,235
$93,399
$97,981
$120,892
$143,802
$162,131
Maine
80-99.99
85.1
$30,182
$35,371
$45,749
$56,128
$66,506
$76,885
$92,453
$102,831
$108,020
$133,967
$159,913
$180,670
Maine
100 <
145.0
$45,180
$53,368
$69,745
$86,121
$102,497
$118,874
$143,438
$159,815
$168,003
$208,944
$249,884
$282,637
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$9,025
$10,225
$12,623
$15,022
$17,420
$19,819
$23,416
$25,815
$27,014
$33,010
$39,006
$43,803
Maryland
15-19.99
17.0
$10,094
$11,485
$14,266
$17,047
$19,828
$22,610
$26,781
$29,563
$30,953
$37,906
$44,859
$50,422
Maryland
20-29.99
23.0
$17,016
$19,136
$23,377
$27,617
$31,857
$36,098
$42,459
$46,699
$48,819
$59,420
$70,021
$78,502
Maryland
30-39.99
34.0
$19,090
$21,631
$26,714
$31,796
$36,878
$41,961
$49,584
$54,667
$57,208
$69,914
$82,620
$92,785
Maryland
40-59.99
46.0
$20,128
$23,368
$29,849
$36,330
$42,811
$49,292
$59,013
$65,494
$68,734
$84,936
$101,139
$114,100
Maryland
60-79.99
69.0
$29,288
$33,909
$43,150
$52,392
$61,633
$70,874
$84,736
$93,978
$98,598
$121,702
$144,805
$163,288
Maryland
80-99.99
85.1
$30,229
$35,466
$45,940
$56,413
$66,887
$77,361
$93,071
$103,545
$108,781
$134,966
$161,150
$182,097
Maryland
100 <
145.0
$45,261
$53,531
$70,069
$86,607
$103,146
$119,684
$144,492
$161,030
$169,299
$210,645
$251,991
$285,068
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$9,027
$10,227
$12,628
$15,029
$17,431
$19,832
$23,433
$25,834
$27,035
$33,038
$39,040
$43,843
1-258

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$10,096
$11,489
$14,274
$17,058
$19,843
$22,628
$26,806
$29,590
$30,983
$37,945
$44,907
$50,477
Massachusetts
20-29.99
23.0
$17,018
$19,141
$23,387
$27,632
$31,878
$36,123
$42,491
$46,737
$48,859
$59,473
$70,087
$78,578
Massachusetts
30-39.99
34.0
$19,094
$21,639
$26,729
$31,818
$36,908
$41,998
$49,633
$54,722
$57,267
$69,992
$82,716
$92,896
Massachusetts
40-59.99
46.0
$20,133
$23,378
$29,869
$36,360
$42,851
$49,342
$59,078
$65,569
$68,814
$85,042
$101,269
$114,251
Massachusetts
60-79.99
69.0
$29,296
$33,924
$43,181
$52,437
$61,693
$70,950
$84,834
$94,091
$98,719
$121,860
$145,001
$163,513
Massachusetts
80-99.99
85.1
$30,239
$35,485
$45,977
$56,469
$66,961
$77,453
$93,192
$103,684
$108,930
$135,160
$161,391
$182,375
Massachusetts
100 <
145.0
$45,277
$53,562
$70,132
$86,702
$103,272
$119,842
$144,697
$161,267
$169,552
$210,978
$252,403
$285,543
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$8,895
$9,964
$12,102
$14,240
$16,377
$18,515
$21,722
$23,860
$24,929
$30,273
$35,618
$39,893
Michigan
15-19.99
17.0
$9,910
$11,116
$13,527
$15,939
$18,351
$20,763
$24,381
$26,793
$27,999
$34,029
$40,058
$44,882
Michigan
20-29.99
23.0
$16,766
$18,636
$22,377
$26,118
$29,859
$33,600
$39,211
$42,952
$44,822
$54,174
$63,526
$71,008
Michigan
30-39.99
34.0
$18,721
$20,893
$25,236
$29,580
$33,924
$38,268
$44,783
$49,127
$51,299
$62,159
$73,018
$81,706
Michigan
40-59.99
46.0
$19,628
$22,369
$27,850
$33,332
$38,814
$44,295
$52,517
$57,999
$60,740
$74,444
$88,148
$99,111
Michigan
60-79.99
69.0
$28,539
$32,410
$40,153
$47,895
$55,637
$63,380
$74,993
$82,736
$86,607
$105,963
$125,319
$140,803
Michigan
80-99.99
85.1
$29,305
$33,617
$42,242
$50,867
$59,492
$68,117
$81,054
$89,679
$93,992
$115,554
$137,116
$154,366
Michigan
100 <
145.0
$43,686
$50,381
$63,769
$77,157
$90,546
$103,934
$124,017
$137,406
$144,100
$177,571
$211,042
$237,819
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$8,878
$9,931
$12,035
$14,140
$16,245
$18,349
$21,506
$23,611
$24,663
$29,925
$35,186
$39,396
Minnesota
15-19.99
17.0
$9,886
$11,069
$13,434
$15,798
$18,163
$20,528
$24,076
$26,441
$27,623
$33,535
$39,448
$44,177
Minnesota
20-29.99
23.0
$16,734
$18,573
$22,250
$25,927
$29,605
$33,282
$38,798
$42,475
$44,314
$53,507
$62,700
$70,054
Minnesota
30-39.99
34.0
$18,674
$20,799
$25,049
$29,298
$33,548
$37,798
$44,173
$48,423
$50,547
$61,172
$71,797
$80,296
Minnesota
40-59.99
46.0
$19,564
$22,242
$27,596
$32,951
$38,305
$43,660
$51,691
$57,046
$59,723
$73,109
$86,495
$97,204
Minnesota
60-79.99
69.0
$28,444
$32,220
$39,771
$47,323
$54,875
$62,426
$73,754
$81,306
$85,081
$103,961
$122,840
$137,943
Minnesota
80-99.99
85.1
$29,187
$33,382
$41,772
$50,162
$58,552
$66,941
$79,526
$87,916
$92,111
$113,085
$134,059
$150,839
Minnesota
100 <
145.0
$43,486
$49,980
$62,968
$75,955
$88,943
$101,931
$121,413
$134,400
$140,894
$173,364
$205,833
$231,809
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-259

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$9,136
$10,446
$13,066
$15,686
$18,306
$20,926
$24,856
$27,476
$28,786
$35,335
$41,885
$47,125
Mississippi
15-19.99
17.0
$10,251
$11,799
$14,893
$17,988
$21,083
$24,178
$28,821
$31,915
$33,463
$41,200
$48,937
$55,127
Mississippi
20-29.99
23.0
$17,228
$19,561
$24,225
$28,890
$33,555
$38,220
$45,217
$49,882
$52,215
$63,877
$75,539
$84,869
Mississippi
30-39.99
34.0
$19,404
$22,259
$27,968
$33,678
$39,388
$45,098
$53,663
$59,372
$62,227
$76,502
$90,776
$102,196
Mississippi
40-59.99
46.0
$20,552
$24,217
$31,547
$38,876
$46,206
$53,536
$64,530
$71,860
$75,525
$93,849
$112,174
$126,833
Mississippi
60-79.99
69.0
$29,925
$35,182
$45,697
$56,212
$66,726
$77,241
$93,013
$103,527
$108,784
$135,071
$161,357
$182,387
Mississippi
80-99.99
85.1
$31,014
$37,036
$49,080
$61,124
$73,168
$85,212
$103,278
$115,322
$121,344
$151,454
$181,564
$205,652
Mississippi
100 <
145.0
$46,599
$56,206
$75,420
$94,634
$113,849
$133,063
$161,884
$181,098
$190,705
$238,740
$286,776
$325,204
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$8,965
$10,104
$12,382
$14,660
$16,937
$19,215
$22,632
$24,910
$26,049
$31,743
$37,438
$41,994
Missour

15-19.99
17.0
$10,009
$11,314
$13,924
$16,534
$19,145
$21,755
$25,670
$28,281
$29,586
$36,111
$42,637
$47,858
Missour

20-29.99
23.0
$16,900
$18,905
$22,914
$26,923
$30,932
$34,942
$40,955
$44,964
$46,969
$56,992
$67,015
$75,033
Missour

30-39.99
34.0
$18,919
$21,289
$26,030
$30,770
$35,511
$40,251
$47,362
$52,103
$54,473
$66,324
$78,176
$87,657
Missour

40-59.99
46.0
$19,896
$22,906
$28,924
$34,942
$40,961
$46,979
$56,006
$62,025
$65,034
$80,080
$95,126
$107,162
Missour

60-79.99
69.0
$28,942
$33,215
$41,763
$50,310
$58,858
$67,405
$80,227
$88,774
$93,048
$114,417
$135,786
$152,881
Missour

80-99.99
85.1
$29,801
$34,610
$44,228
$53,846
$63,464
$73,082
$87,509
$97,127
$101,936
$125,981
$150,026
$169,262
Missour

100 <
145.0
$44,532
$52,073
$67,153
$82,233
$97,314
$112,394
$135,015
$150,095
$157,636
$195,337
$233,038
$263,199
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$8,347
$9,215
$10,951
$12,687
$14,423
$16,158
$18,762
$20,498
$21,366
$25,706
$30,045
$33,517
Montana
15-19.99
17.0
$8,982
$9,903
$11,746
$13,588
$15,431
$17,273
$20,037
$21,879
$22,801
$27,407
$32,013
$35,698
Montana
20-29.99
23.0
$15,687
$17,172
$20,143
$23,113
$26,083
$29,054
$33,509
$36,480
$37,965
$45,391
$52,817
$58,758
Montana
30-39.99
34.0
$16,865
$18,468
$21,673
$24,878
$28,083
$31,288
$36,095
$39,300
$40,903
$48,915
$56,927
$63,337
Montana
40-59.99
46.0
$17,572
$19,542
$23,483
$27,424
$31,365
$35,305
$41,217
$45,157
$47,128
$56,980
$66,832
$74,714
Montana
60-79.99
69.0
$25,454
$28,170
$33,601
$39,033
$44,464
$49,895
$58,042
$63,473
$66,189
$79,767
$93,345
$104,208
Montana
80-99.99
85.1
$25,951
$28,838
$34,613
$40,387
$46,162
$51,936
$60,598
$66,373
$69,260
$83,696
$98,133
$109,682
1-260

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$37,498
$41,764
$50,296
$58,827
$67,359
$75,891
$88,689
$97,220
$101,486
$122,816
$144,145
$161,209
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$8,874
$9,921
$12,016
$14,111
$16,206
$18,301
$21,444
$23,539
$24,587
$29,824
$35,062
$39,252
Nebraska
15-19.99
17.0
$9,879
$11,055
$13,406
$15,758
$18,109
$20,460
$23,987
$26,339
$27,514
$33,393
$39,271
$43,974
Nebraska
20-29.99
23.0
$16,725
$18,555
$22,213
$25,872
$29,531
$33,190
$38,678
$42,337
$44,166
$53,314
$62,461
$69,778
Nebraska
30-39.99
34.0
$18,660
$20,772
$24,994
$29,217
$33,439
$37,662
$43,996
$48,219
$50,330
$60,887
$71,443
$79,889
Nebraska
40-59.99
46.0
$19,546
$22,205
$27,523
$32,840
$38,158
$43,476
$51,452
$56,770
$59,429
$72,723
$86,017
$96,653
Nebraska
60-79.99
69.0
$28,416
$32,164
$39,661
$47,157
$54,654
$62,151
$73,395
$80,892
$84,640
$103,382
$122,123
$137,116
Nebraska
80-99.99
85.1
$29,153
$33,314
$41,636
$49,958
$58,279
$66,601
$79,084
$87,406
$91,566
$112,371
$133,175
$149,819
Nebraska
100 <
145.0
$43,428
$49,864
$62,736
$75,608
$88,480
$101,351
$120,659
$133,531
$139,967
$172,147
$204,326
$230,070
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$8,123
$8,904
$10,467
$12,030
$13,593
$15,156
$17,500
$19,063
$19,845
$23,752
$27,659
$30,785
Nevada
15-19.99
17.0
$8,512
$9,311
$10,909
$12,506
$14,104
$15,701
$18,098
$19,695
$20,494
$24,488
$28,481
$31,676
Nevada
20-29.99
23.0
$15,245
$16,565
$19,204
$21,843
$24,482
$27,121
$31,079
$33,718
$35,038
$41,635
$48,233
$53,511
Nevada
30-39.99
34.0
$15,926
$17,284
$19,999
$22,714
$25,429
$28,144
$32,217
$34,932
$36,289
$43,077
$49,864
$55,294
Nevada
40-59.99
46.0
$17,240
$18,879
$22,157
$25,435
$28,713
$31,991
$36,908
$40,186
$41,825
$50,020
$58,215
$64,771
Nevada
60-79.99
69.0
$24,957
$27,176
$31,613
$36,050
$40,487
$44,924
$51,579
$56,016
$58,235
$69,327
$80,419
$89,293
Nevada
80-99.99
85.1
$25,338
$27,612
$32,160
$36,708
$41,257
$45,805
$52,627
$57,175
$59,450
$70,820
$82,191
$91,287
Nevada
100 <
145.0
$33,881
$37,102
$43,545
$49,987
$56,429
$62,872
$72,535
$78,978
$82,199
$98,304
$114,410
$127,295
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$9,003
$10,180
$12,534
$14,888
$17,241
$19,595
$23,126
$25,480
$26,657
$32,541
$38,426
$43,134
1-261

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$10,063
$11,422
$14,140
$16,857
$19,575
$22,293
$26,370
$29,088
$30,447
$37,242
$44,037
$49,473
New
Hampshire
20-29.99
23.0
$16,973
$19,051
$23,205
$27,360
$31,515
$35,670
$41,902
$46,057
$48,134
$58,522
$68,909
$77,218
New
Hampshire
30-39.99
34.0
$19,027
$21,505
$26,461
$31,416
$36,372
$41,328
$48,762
$53,718
$56,196
$68,585
$80,975
$90,887
New
Hampshire
40-59.99
46.0
$20,042
$23,197
$29,507
$35,816
$42,126
$48,436
$57,900
$64,210
$67,365
$83,139
$98,913
$111,533
New
Hampshire
60-79.99
69.0
$29,160
$33,652
$42,637
$51,621
$60,606
$69,591
$83,067
$92,052
$96,544
$119,006
$141,467
$159,436
New
Hampshire
80-99.99
85.1
$30,071
$35,149
$45,306
$55,463
$65,620
$75,777
$91,013
$101,170
$106,248
$131,640
$157,033
$177,347
New
Hampshire
100 <
145.0
$44,992
$52,991
$68,990
$84,989
$100,987
$116,986
$140,985
$156,983
$164,983
$204,980
$244,977
$276,975
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$9,077
$10,327
$12,828
$15,329
$17,829
$20,330
$24,082
$26,582
$27,833
$34,085
$40,337
$45,339
New Jersey
15-19.99
17.0
$10,167
$11,630
$14,556
$17,482
$20,408
$23,335
$27,724
$30,650
$32,113
$39,429
$46,744
$52,597
New Jersey
20-29.99
23.0
$17,114
$19,332
$23,769
$28,206
$32,642
$37,079
$43,734
$48,170
$50,389
$61,480
$72,572
$81,445
New Jersey
30-39.99
34.0
$19,235
$21,921
$27,294
$32,666
$38,038
$43,411
$51,469
$56,842
$59,528
$72,959
$86,390
$97,135
New Jersey
40-59.99
46.0
$20,324
$23,760
$30,634
$37,507
$44,380
$51,253
$61,563
$68,436
$71,873
$89,056
$106,239
$119,986
New Jersey
60-79.99
69.0
$29,583
$34,498
$44,327
$54,157
$63,987
$73,817
$88,562
$98,392
$103,307
$127,881
$152,456
$172,115
New Jersey
80-99.99
85.1
$30,592
$36,192
$47,391
$58,591
$69,790
$80,990
$97,789
$108,989
$114,588
$142,587
$170,586
$192,985
New Jersey
100 <
145.0
$45,880
$54,767
$72,542
$90,318
$108,093
$125,868
$152,531
$170,306
$179,193
$223,631
$268,069
$303,620
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$8,734
$9,642
$11,458
$13,273
$15,089
$16,905
$19,628
$21,444
$22,352
$26,891
$31,431
$35,062
New Mexico
15-19.99
17.0
$9,039
$10,016
$11,972
$13,928
$15,883
$17,839
$20,772
$22,728
$23,706
$28,595
$33,484
$37,395
New Mexico
20-29.99
23.0
$15,763
$17,325
$20,449
$23,572
$26,696
$29,819
$34,505
$37,628
$39,190
$46,999
$54,807
$61,055
New Mexico
30-39.99
34.0
$16,979
$18,694
$22,125
$25,557
$28,988
$32,419
$37,566
$40,998
$42,713
$51,291
$59,870
$66,732
New Mexico
40-59.99
46.0
$17,725
$19,848
$24,095
$28,342
$32,589
$36,836
$43,207
$47,454
$49,578
$60,195
$70,813
$79,307
New Mexico
60-79.99
69.0
$25,684
$28,629
$34,520
$40,410
$46,301
$52,192
$61,027
$66,918
$69,863
$84,590
$99,316
$111,097
1-262

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$28,163
$31,334
$37,675
$44,016
$50,357
$56,698
$66,209
$72,550
$75,721
$91,573
$107,426
$120,108
New Mexico
100 <
145.0
$41,741
$46,489
$55,986
$65,483
$74,980
$84,477
$98,722
$108,219
$112,968
$136,710
$160,453
$179,447
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$8,967
$10,108
$12,390
$14,671
$16,953
$19,235
$22,657
$24,939
$26,080
$31,784
$37,489
$42,052
New York
15-19.99
17.0
$10,012
$11,320
$13,935
$16,551
$19,167
$21,783
$25,706
$28,322
$29,630
$36,170
$42,709
$47,941
New York
20-29.99
23.0
$16,904
$18,912
$22,929
$26,946
$30,962
$34,979
$41,004
$45,021
$47,029
$57,071
$67,113
$75,146
New York
30-39.99
34.0
$18,925
$21,301
$26,052
$30,804
$35,555
$40,307
$47,434
$52,186
$54,562
$66,441
$78,320
$87,823
New York
40-59.99
46.0
$19,904
$22,921
$28,954
$34,987
$41,021
$47,054
$56,104
$62,137
$65,154
$80,238
$95,321
$107,388
New York
60-79.99
69.0
$28,953
$33,238
$41,808
$50,378
$58,948
$67,518
$80,373
$88,943
$93,228
$114,653
$136,078
$153,219
New York
80-99.99
85.1
$29,815
$34,638
$44,284
$53,930
$63,575
$73,221
$87,690
$97,335
$102,158
$126,273
$150,387
$169,678
New York
100 <
145.0
$44,556
$52,120
$67,248
$82,375
$97,503
$112,631
$135,323
$150,451
$158,014
$195,834
$233,653
$263,909
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$9,035
$10,244
$12,662
$15,081
$17,499
$19,917
$23,544
$25,962
$27,171
$33,217
$39,262
$44,098
North Carolina
15-19.99
17.0
$10,108
$11,513
$14,322
$17,131
$19,940
$22,749
$26,963
$29,772
$31,176
$38,199
$45,221
$50,839
North Carolina
20-29.99
23.0
$17,035
$19,174
$23,452
$27,730
$32,008
$36,286
$42,704
$46,982
$49,121
$59,816
$70,511
$79,068
North Carolina
30-39.99
34.0
$19,118
$21,687
$26,825
$31,963
$37,101
$42,239
$49,947
$55,085
$57,654
$70,499
$83,344
$93,620
North Carolina
40-59.99
46.0
$20,165
$23,443
$30,000
$36,556
$43,112
$49,668
$59,503
$66,059
$69,337
$85,728
$102,119
$115,231
North Carolina
60-79.99
69.0
$29,345
$34,022
$43,377
$52,731
$62,085
$71,440
$85,471
$94,826
$99,503
$122,889
$146,275
$164,984
North Carolina
80-99.99
85.1
$30,299
$35,606
$46,219
$56,832
$67,445
$78,058
$93,978
$104,591
$109,897
$136,430
$162,963
$184,189
North Carolina
100 <
145.0
$45,380
$53,768
$70,544
$87,320
$104,096
$120,872
$146,036
$162,812
$171,200
$213,140
$255,081
$288,633
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$8,741
$9,656
$11,485
$13,314
$15,144
$16,973
$19,717
$21,547
$22,462
$27,035
$31,609
$35,268
North Dakota
15-19.99
17.0
$9,048
$10,036
$12,011
$13,986
$15,961
$17,936
$20,898
$22,873
$23,861
$28,798
$33,736
$37,686
North Dakota
20-29.99
23.0
$16,471
$18,045
$21,195
$24,345
$27,495
$30,644
$35,369
$38,519
$40,094
$47,968
$55,842
$62,142
1-263

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$16,998
$18,733
$22,203
$25,673
$29,143
$32,613
$37,818
$41,288
$43,023
$51,698
$60,374
$67,314
North Dakota
40-59.99
46.0
$19,037
$21,187
$25,486
$29,786
$34,085
$38,385
$44,834
$49,133
$51,283
$62,032
$72,780
$81,379
North Dakota
60-79.99
69.0
$27,652
$30,637
$36,606
$42,575
$48,545
$54,514
$63,468
$69,437
$72,422
$87,345
$102,268
$114,206
North Dakota
80-99.99
85.1
$28,212
$31,431
$37,869
$44,307
$50,745
$57,183
$66,840
$73,278
$76,497
$92,592
$108,687
$121,563
North Dakota
100 <
145.0
$41,823
$46,654
$56,317
$65,979
$75,641
$85,304
$99,797
$109,459
$114,290
$138,446
$162,602
$181,926
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$8,977
$10,127
$12,428
$14,729
$17,029
$19,330
$22,782
$25,082
$26,233
$31,985
$37,737
$42,339
Ohio
15-19.99
17.0
$10,025
$11,347
$13,989
$16,632
$19,275
$21,918
$25,882
$28,525
$29,847
$36,454
$43,061
$48,347
Ohio
20-29.99
23.0
$16,922
$18,949
$23,002
$27,056
$31,109
$35,162
$41,242
$45,295
$47,322
$57,455
$67,588
$75,695
Ohio
30-39.99
34.0
$18,952
$21,355
$26,160
$30,966
$35,772
$40,578
$47,786
$52,592
$54,995
$67,009
$79,023
$88,635
Ohio
40-59.99
46.0
$19,940
$22,994
$29,100
$35,207
$41,313
$47,420
$56,580
$62,686
$65,740
$81,006
$96,273
$108,486
Ohio
60-79.99
69.0
$29,008
$33,348
$42,027
$50,707
$59,387
$68,067
$81,087
$89,767
$94,107
$115,806
$137,506
$154,865
Ohio
80-99.99
85.1
$29,883
$34,774
$44,555
$54,336
$64,117
$73,898
$88,570
$98,351
$103,242
$127,694
$152,147
$171,710
Ohio
100 <
145.0
$44,671
$52,351
$67,709
$83,068
$98,426
$113,785
$136,822
$152,181
$159,860
$198,256
$236,653
$267,370
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$8,923
$10,019
$12,212
$14,405
$16,597
$18,790
$22,079
$24,272
$25,369
$30,851
$36,333
$40,718
Oklahoma
15-19.99
17.0
$9,949
$11,194
$13,683
$16,173
$18,663
$21,153
$24,887
$27,377
$28,622
$34,847
$41,071
$46,051
Oklahoma
20-29.99
23.0
$16,819
$18,742
$22,588
$26,434
$30,281
$34,127
$39,896
$43,742
$45,665
$55,281
$64,896
$72,589
Oklahoma
30-39.99
34.0
$18,799
$21,049
$25,548
$30,048
$34,547
$39,047
$45,796
$50,296
$52,546
$63,795
$75,044
$84,043
Oklahoma
40-59.99
46.0
$19,733
$22,580
$28,272
$33,964
$39,657
$45,349
$53,888
$59,580
$62,427
$76,658
$90,889
$102,273
Oklahoma
60-79.99
69.0
$28,697
$32,726
$40,785
$48,844
$56,902
$64,961
$77,049
$85,107
$89,137
$109,283
$129,430
$145,547
Oklahoma
80-99.99
85.1
$29,500
$34,007
$43,022
$52,037
$61,052
$70,067
$83,590
$92,605
$97,112
$119,650
$142,187
$160,217
Oklahoma
100 <
145.0
$44,019
$51,045
$65,098
$79,151
$93,204
$107,257
$128,337
$142,390
$149,416
$184,549
$219,682
$247,788
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-264

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$9,008
$10,191
$12,555
$14,920
$17,284
$19,649
$23,196
$25,560
$26,742
$32,654
$38,565
$43,294
Oregon
15-19.99
17.0
$10,070
$11,437
$14,170
$16,903
$19,636
$22,369
$26,469
$29,202
$30,568
$37,401
$44,234
$49,700
Oregon
20-29.99
23.0
$16,983
$19,071
$23,246
$27,422
$31,597
$35,773
$42,036
$46,211
$48,299
$58,737
$69,175
$77,526
Oregon
30-39.99
34.0
$19,042
$21,535
$26,521
$31,507
$36,494
$41,480
$48,959
$53,945
$56,438
$68,904
$81,369
$91,342
Oregon
40-59.99
46.0
$20,063
$23,238
$29,589
$35,939
$42,290
$48,641
$58,167
$64,518
$67,693
$83,570
$99,447
$112,148
Oregon
60-79.99
69.0
$29,191
$33,714
$42,760
$51,806
$60,852
$69,898
$83,467
$92,514
$97,037
$119,652
$142,267
$160,359
Oregon
80-99.99
85.1
$30,109
$35,225
$45,458
$55,691
$65,924
$76,157
$91,506
$101,739
$106,855
$132,438
$158,020
$178,485
Oregon
100 <
145.0
$45,056
$53,120
$69,248
$85,377
$101,505
$117,633
$141,825
$157,954
$166,018
$206,338
$246,659
$278,915
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$9,018
$10,210
$12,594
$14,978
$17,362
$19,746
$23,322
$25,706
$26,898
$32,858
$38,818
$43,586
Pennsylvania
15-19.99
17.0
$10,084
$11,464
$14,225
$16,986
$19,746
$22,507
$26,648
$29,408
$30,789
$37,690
$44,592
$50,113
Pennsylvania
20-29.99
23.0
$17,002
$19,108
$23,321
$27,534
$31,746
$35,959
$42,278
$46,490
$48,597
$59,128
$69,660
$78,085
Pennsylvania
30-39.99
34.0
$19,070
$21,590
$26,631
$31,673
$36,714
$41,755
$49,317
$54,358
$56,879
$69,482
$82,085
$92,168
Pennsylvania
40-59.99
46.0
$20,100
$23,312
$29,738
$36,163
$42,588
$49,013
$58,651
$65,077
$68,289
$84,352
$100,415
$113,266
Pennsylvania
60-79.99
69.0
$29,247
$33,826
$42,984
$52,141
$61,299
$70,457
$84,194
$93,352
$97,931
$120,825
$143,720
$162,036
Pennsylvania
80-99.99
85.1
$30,178
$35,363
$45,734
$56,105
$66,475
$76,846
$92,402
$102,773
$107,958
$133,885
$159,812
$180,553
Pennsylvania
100 <
145.0
$45,174
$53,355
$69,718
$86,081
$102,444
$118,807
$143,352
$159,715
$167,896
$208,804
$249,712
$282,438
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$9,052
$10,278
$12,730
$15,182
$17,634
$20,086
$23,763
$26,215
$27,441
$33,571
$39,701
$44,604
Rhode Island
15-19.99
17.0
$10,132
$11,561
$14,417
$17,274
$20,131
$22,988
$27,273
$30,130
$31,558
$38,701
$45,843
$51,556
Rhode Island
20-29.99
23.0
$17,067
$19,238
$23,581
$27,924
$32,267
$36,610
$43,124
$47,467
$49,638
$60,495
$71,352
$80,038
Rhode Island
30-39.99
34.0
$19,166
$21,783
$27,016
$32,250
$37,484
$42,717
$50,568
$55,802
$58,418
$71,503
$84,587
$95,054
Rhode Island
40-59.99
46.0
$20,230
$23,573
$30,258
$36,944
$43,630
$50,315
$60,343
$67,029
$70,372
$87,086
$103,800
$117,171
Rhode Island
60-79.99
69.0
$29,442
$34,216
$43,765
$53,313
$62,861
$72,410
$86,732
$96,281
$101,055
$124,926
$148,797
$167,893
Rhode Island
80-99.99
85.1
$30,419
$35,845
$46,697
$57,549
$68,402
$79,254
$95,533
$106,385
$111,811
$138,942
$166,073
$187,777
Rhode Island
100 <
145.0
$45,584
$54,176
$71,359
$88,543
$105,727
$122,910
$148,686
$165,870
$174,462
$217,421
$260,380
$294,747
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-265

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$9,060
$10,293
$12,761
$15,228
$17,695
$20,163
$23,864
$26,331
$27,564
$33,733
$39,901
$44,836
South Carolina
15-19.99
17.0
$10,143
$11,582
$14,461
$17,340
$20,218
$23,097
$27,415
$30,294
$31,733
$38,930
$46,126
$51,884
South Carolina
20-29.99
23.0
$17,082
$19,268
$23,640
$28,013
$32,385
$36,757
$43,316
$47,688
$49,874
$60,805
$71,736
$80,481
South Carolina
30-39.99
34.0
$19,188
$21,826
$27,104
$32,381
$37,658
$42,936
$50,852
$56,129
$58,768
$71,961
$85,154
$95,709
South Carolina
40-59.99
46.0
$20,260
$23,632
$30,376
$37,121
$43,866
$50,610
$60,727
$67,472
$70,844
$87,706
$104,568
$118,057
South Carolina
60-79.99
69.0
$29,486
$34,305
$43,942
$53,579
$63,216
$72,853
$87,308
$96,945
$101,763
$125,856
$149,948
$169,222
South Carolina
80-99.99
85.1
$30,473
$35,954
$46,916
$57,877
$68,839
$79,800
$96,243
$107,204
$112,685
$140,089
$167,493
$189,416
South Carolina
100 <
145.0
$45,677
$54,362
$71,732
$89,102
$106,471
$123,841
$149,896
$167,266
$175,951
$219,376
$262,800
$297,540
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$8,741
$9,656
$11,485
$13,315
$15,145
$16,974
$19,719
$21,548
$22,463
$27,037
$31,611
$35,271
South Dakota
15-19.99
17.0
$9,691
$10,679
$12,654
$14,630
$16,605
$18,580
$21,543
$23,518
$24,506
$29,444
$34,383
$38,333
South Dakota
20-29.99
23.0
$16,471
$18,046
$21,196
$24,346
$27,496
$30,646
$35,371
$38,522
$40,097
$47,972
$55,847
$62,147
South Dakota
30-39.99
34.0
$18,284
$20,020
$23,490
$26,961
$30,431
$33,902
$39,108
$42,578
$44,314
$52,990
$61,667
$68,608
South Dakota
40-59.99
46.0
$19,037
$21,187
$25,488
$29,788
$34,088
$38,388
$44,839
$49,139
$51,289
$62,040
$72,790
$81,391
South Dakota
60-79.99
69.0
$27,653
$30,638
$36,609
$42,579
$48,549
$54,520
$63,475
$69,445
$72,431
$87,357
$102,282
$114,223
South Dakota
80-99.99
85.1
$28,212
$31,432
$37,871
$44,311
$50,750
$57,190
$66,849
$73,288
$76,508
$92,607
$108,705
$121,584
South Dakota
100 <
145.0
$41,824
$46,657
$56,321
$65,986
$75,651
$85,315
$99,812
$109,477
$114,309
$138,471
$162,633
$181,962
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$9,067
$10,308
$12,789
$15,271
$17,752
$20,234
$23,956
$26,438
$27,679
$33,883
$40,087
$45,050
Tennessee
15-19.99
17.0
$10,153
$11,603
$14,502
$17,400
$20,299
$23,198
$27,547
$30,446
$31,895
$39,142
$46,390
$52,187
Tennessee
20-29.99
23.0
$17,096
$19,295
$23,695
$28,095
$32,494
$36,894
$43,494
$47,893
$50,093
$61,093
$72,092
$80,891
Tennessee
30-39.99
34.0
$19,208
$21,867
$27,185
$32,502
$37,820
$43,138
$51,115
$56,433
$59,091
$72,386
$85,681
$96,316
Tennessee
40-59.99
46.0
$20,287
$23,687
$30,486
$37,285
$44,085
$50,884
$61,083
$67,883
$71,282
$88,281
$105,279
$118,878
Tennessee
60-79.99
69.0
$29,527
$34,387
$44,106
$53,825
$63,544
$73,263
$87,842
$97,561
$102,421
$126,718
$151,016
$170,454
1-266

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$30,524
$36,055
$47,118
$58,181
$69,244
$80,307
$96,901
$107,964
$113,496
$141,153
$168,810
$190,936
Tennessee
100 <
145.0
$45,763
$54,535
$72,077
$89,619
$107,162
$124,704
$151,018
$168,561
$177,332
$221,188
$265,044
$300,129
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$8,919
$10,013
$12,199
$14,385
$16,572
$18,758
$22,038
$24,224
$25,318
$30,784
$36,250
$40,623
Texas
15-19.99
17.0
$9,944
$11,185
$13,665
$16,146
$18,627
$21,108
$24,829
$27,310
$28,550
$34,752
$40,954
$45,916
Texas
20-29.99
23.0
$16,813
$18,730
$22,564
$26,398
$30,232
$34,066
$39,817
$43,651
$45,568
$55,153
$64,738
$72,406
Texas
30-39.99
34.0
$18,790
$21,031
$25,512
$29,994
$34,475
$38,957
$45,679
$50,161
$52,402
$63,606
$74,810
$83,773
Texas
40-59.99
46.0
$19,721
$22,555
$28,223
$33,891
$39,559
$45,228
$53,730
$59,398
$62,232
$76,402
$90,572
$101,908
Texas
60-79.99
69.0
$28,679
$32,690
$40,712
$48,734
$56,756
$64,778
$76,811
$84,833
$88,845
$108,900
$128,955
$144,999
Texas
80-99.99
85.1
$29,477
$33,962
$42,932
$51,902
$60,872
$69,842
$83,297
$92,267
$96,752
$119,177
$141,601
$159,541
Texas
100 <
145.0
$43,980
$50,968
$64,945
$78,921
$92,897
$106,873
$127,838
$141,814
$148,802
$183,743
$218,684
$246,636
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$8,377
$9,275
$11,072
$12,868
$14,664
$16,460
$19,155
$20,951
$21,849
$26,339
$30,830
$34,422
Utah
15-19.99
17.0
$9,025
$9,989
$11,917
$13,845
$15,773
$17,701
$20,593
$22,521
$23,485
$28,304
$33,124
$36,980
Utah
20-29.99
23.0
$15,745
$17,288
$20,374
$23,460
$26,546
$29,632
$34,261
$37,347
$38,890
$46,606
$54,321
$60,493
Utah
30-39.99
34.0
$16,951
$18,639
$22,015
$25,391
$28,767
$32,143
$37,207
$40,583
$42,271
$50,710
$59,150
$65,902
Utah
40-59.99
46.0
$17,687
$19,773
$23,946
$28,118
$32,290
$36,462
$42,720
$46,893
$48,979
$59,409
$69,839
$78,184
Utah
60-79.99
69.0
$25,628
$28,517
$34,295
$40,074
$45,852
$51,630
$60,297
$66,076
$68,965
$83,411
$97,856
$109,413
Utah
80-99.99
85.1
$28,094
$31,195
$37,398
$43,600
$49,803
$56,005
$65,309
$71,511
$74,613
$90,119
$105,625
$118,030
Utah
100 <
145.0
$37,863
$42,493
$51,754
$61,015
$70,276
$79,537
$93,428
$102,689
$107,320
$130,472
$153,625
$172,147
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$8,935
$10,045
$12,263
$14,482
$16,701
$18,919
$22,247
$24,466
$25,575
$31,122
$36,668
$41,106
Vermont
15-19.99
17.0
$9,967
$11,230
$13,756
$16,283
$18,809
$21,336
$25,125
$27,652
$28,915
$35,231
$41,547
$46,600
Vermont
20-29.99
23.0
$16,844
$18,791
$22,687
$26,583
$30,479
$34,374
$40,218
$44,114
$46,061
$55,801
$65,540
$73,331
1-267

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$18,835
$21,122
$25,694
$30,267
$34,840
$39,413
$46,272
$50,845
$53,131
$64,563
$75,995
$85,141
Vermont
40-59.99
46.0
$19,783
$22,679
$28,470
$34,261
$40,053
$45,844
$54,531
$60,323
$63,219
$77,697
$92,176
$103,758
Vermont
60-79.99
69.0
$28,771
$32,875
$41,082
$49,289
$57,496
$65,703
$78,014
$86,221
$90,325
$110,843
$131,360
$147,775
Vermont
80-99.99
85.1
$29,592
$34,191
$43,389
$52,587
$61,785
$70,983
$84,780
$93,978
$98,577
$121,573
$144,568
$162,964
Vermont
100 <
145.0
$44,175
$51,357
$65,722
$80,087
$94,453
$108,818
$130,365
$144,730
$151,913
$187,826
$223,739
$252,469
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$9,004
$10,183
$12,539
$14,896
$17,252
$19,609
$23,144
$25,500
$26,678
$32,570
$38,461
$43,174
Virginia
15-19.99
17.0
$10,065
$11,425
$14,147
$16,869
$19,591
$22,312
$26,395
$29,117
$30,478
$37,282
$44,086
$49,530
Virginia
20-29.99
23.0
$16,976
$19,056
$23,216
$27,376
$31,536
$35,696
$41,936
$46,096
$48,176
$58,576
$68,976
$77,296
Virginia
30-39.99
34.0
$19,031
$21,512
$26,476
$31,439
$36,403
$41,366
$48,812
$53,775
$56,257
$68,666
$81,074
$91,001
Virginia
40-59.99
46.0
$20,047
$23,207
$29,527
$35,847
$42,167
$48,487
$57,967
$64,287
$67,447
$83,248
$99,048
$111,688
Virginia
60-79.99
69.0
$29,168
$33,668
$42,668
$51,668
$60,668
$69,668
$83,168
$92,168
$96,668
$119,168
$141,668
$159,668
Virginia
80-99.99
85.1
$30,081
$35,169
$45,345
$55,521
$65,697
$75,873
$91,137
$101,313
$106,401
$131,841
$157,281
$177,633
Virginia
100 <
145.0
$45,008
$53,023
$69,055
$85,086
$101,118
$117,149
$141,196
$157,228
$165,243
$205,322
$245,400
$277,463
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$8,949
$10,072
$12,318
$14,564
$16,810
$19,056
$22,425
$24,671
$25,794
$31,409
$37,023
$41,515
Washington
15-19.99
17.0
$9,986
$11,269
$13,834
$16,399
$18,964
$21,529
$25,377
$27,942
$29,224
$35,637
$42,050
$47,180
Washington
20-29.99
23.0
$16,870
$18,844
$22,792
$26,740
$30,688
$34,636
$40,558
$44,506
$46,480
$56,350
$66,221
$74,117
Washington
30-39.99
34.0
$18,874
$21,199
$25,849
$30,499
$35,150
$39,800
$46,775
$51,425
$53,750
$65,376
$77,001
$86,302
Washington
40-59.99
46.0
$19,835
$22,783
$28,679
$34,576
$40,472
$46,368
$55,212
$61,108
$64,056
$78,797
$93,537
$105,329
Washington
60-79.99
69.0
$28,850
$33,032
$41,396
$49,760
$58,125
$66,489
$79,035
$87,399
$91,581
$112,492
$133,402
$150,131
Washington
80-99.99
85.1
$29,688
$34,384
$43,776
$53,168
$62,560
$71,952
$86,039
$95,431
$100,127
$123,607
$147,086
$165,870
Washington
100 <
145.0
$44,340
$51,687
$66,382
$81,078
$95,773
$110,468
$132,511
$147,206
$154,554
$191,292
$228,030
$257,420
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-268

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - NONRESIDENTIAL
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$9,031
$10,236
$12,647
$15,057
$17,467
$19,877
$23,492
$25,903
$27,108
$33,133
$39,159
$43,979
West Virginia
15-19.99
17.0
$10,103
$11,501
$14,299
$17,097
$19,895
$22,693
$26,889
$29,687
$31,086
$38,081
$45,075
$50,671
West Virginia
20-29.99
23.0
$17,027
$19,159
$23,421
$27,684
$31,947
$36,210
$42,605
$46,867
$48,999
$59,656
$70,313
$78,839
West Virginia
30-39.99
34.0
$19,107
$21,664
$26,780
$31,896
$37,011
$42,127
$49,800
$54,916
$57,474
$70,263
$83,052
$93,283
West Virginia
40-59.99
46.0
$20,150
$23,413
$29,939
$36,465
$42,990
$49,516
$59,305
$65,831
$69,094
$85,408
$101,723
$114,774
West Virginia
60-79.99
69.0
$29,322
$33,976
$43,285
$52,594
$61,903
$71,211
$85,174
$94,483
$99,137
$122,409
$145,681
$164,298
West Virginia
80-99.99
85.1
$30,271
$35,549
$46,106
$56,663
$67,219
$77,776
$93,611
$104,168
$109,446
$135,838
$162,230
$183,343
West Virginia
100 <
145.0
$45,332
$53,672
$70,352
$87,032
$103,712
$120,392
$145,412
$162,092
$170,432
$212,132
$253,832
$287,192
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$8,908
$9,990
$12,153
$14,317
$16,481
$18,644
$21,890
$24,053
$25,135
$30,544
$35,953
$40,280
Wisconsin
15-19.99
17.0
$9,928
$11,152
$13,601
$16,049
$18,498
$20,946
$24,619
$27,067
$28,291
$34,412
$40,534
$45,430
Wisconsin
20-29.99
23.0
$16,791
$18,686
$22,476
$26,266
$30,057
$33,847
$39,532
$43,323
$45,218
$54,693
$64,169
$71,750
Wisconsin
30-39.99
34.0
$18,757
$20,966
$25,383
$29,800
$34,217
$38,633
$45,259
$49,676
$51,884
$62,926
$73,969
$82,802
Wisconsin
40-59.99
46.0
$19,677
$22,468
$28,048
$33,629
$39,209
$44,790
$53,161
$58,741
$61,531
$75,483
$89,434
$100,595
Wisconsin
60-79.99
69.0
$28,613
$32,559
$40,449
$48,340
$56,231
$64,122
$75,958
$83,849
$87,794
$107,521
$127,248
$143,029
Wisconsin
80-99.99
85.1
$29,396
$33,800
$42,608
$51,416
$60,224
$69,032
$82,244
$91,052
$95,456
$117,476
$139,496
$157,112
Wisconsin
100 <
145.0
$43,842
$50,692
$64,393
$78,093
$91,793
$105,494
$126,044
$139,745
$146,595
$180,846
$215,096
$242,497
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$8,726
$9,626
$11,426
$13,226
$15,026
$16,826
$19,527
$21,327
$22,227
$26,727
$31,227
$34,827
Wyoming
15-19.99
17.0
$9,027
$9,994
$11,928
$13,861
$15,794
$17,728
$20,628
$22,562
$23,528
$28,362
$33,195
$37,062
Wyoming
20-29.99
23.0
$16,442
$17,989
$21,083
$24,176
$27,270
$30,363
$35,003
$38,097
$39,644
$47,377
$55,111
$61,298
Wyoming
30-39.99
34.0
$16,956
$18,650
$22,037
$25,424
$28,810
$32,197
$37,278
$40,665
$42,358
$50,825
$59,292
$66,066
Wyoming
40-59.99
46.0
$18,981
$21,074
$25,261
$29,448
$33,635
$37,822
$44,103
$48,289
$50,383
$60,850
$71,318
$79,692
Wyoming
60-79.99
69.0
$27,568
$30,468
$36,269
$42,069
$47,870
$53,670
$62,371
$68,171
$71,071
$85,573
$100,074
$111,675
Wyoming
80-99.99
85.1
$28,107
$31,222
$37,452
$43,682
$49,912
$56,142
$65,487
$71,717
$74,832
$90,406
$105,981
$118,441
Wyoming
100 <
145.0
$41,646
$46,300
$55,607
$64,915
$74,223
$83,530
$97,492
$106,799
$111,453
$134,722
$157,991
$176,606
1-269

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Alabama
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alabama
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alabama
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alabama
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alabama
10-14.99
12.0
$12,693
$13,965
$16,511
$19,056
$21,601
$24,146
$27,964
$30,509
$31,782
$38,145
$44,508
$49,599
Alabama
15-19.99
17.0
$15,078
$16,573
$19,562
$22,551
$25,540
$28,529
$33,013
$36,002
$37,496
$44,969
$52,442
$58,420
Alabama
20-29.99
23.0
$24,345
$26,605
$31,127
$35,649
$40,170
$44,692
$51,475
$55,996
$58,257
$69,562
$80,866
$89,909
Alabama
30-39.99
34.0
$29,058
$31,807
$37,305
$42,803
$48,302
$53,800
$62,047
$67,545
$70,294
$84,040
$97,785
$108,781
Alabama
40-59.99
46.0
$30,169
$33,691
$40,734
$47,777
$54,821
$61,864
$72,429
$79,473
$82,994
$100,603
$118,211
$132,298
Alabama
60-79.99
69.0
$44,350
$49,393
$59,478
$69,563
$79,648
$89,733
$104,861
$114,946
$119,989
$145,201
$170,414
$190,584
Alabama
80-99.99
85.1
$45,390
$51,147
$62,661
$74,175
$85,690
$97,204
$114,475
$125,990
$131,747
$160,532
$189,318
$212,347
Alabama
100 <
145.0
$73,188
$82,344
$100,655
$118,967
$137,278
$155,590
$183,057
$201,369
$210,525
$256,304
$302,083
$338,706
Alaska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Alaska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Alaska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Alaska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Alaska
10-14.99
12.0
$12,543
$13,666
$15,912
$18,158
$20,404
$22,650
$26,019
$28,265
$29,388
$35,003
$40,617
$45,109
Alaska
15-19.99
17.0
$14,866
$16,149
$18,714
$21,279
$23,844
$26,409
$30,257
$32,822
$34,104
$40,517
$46,930
$52,060
Alaska
20-29.99
23.0
$24,058
$26,032
$29,980
$33,928
$37,876
$41,824
$47,746
$51,694
$53,668
$63,538
$73,409
$81,305
Alaska
30-39.99
34.0
$28,634
$30,959
$35,609
$40,259
$44,910
$49,560
$56,535
$61,185
$63,510
$75,136
$86,761
$96,062
Alaska
40-59.99
46.0
$29,595
$32,543
$38,439
$44,336
$50,232
$56,128
$64,972
$70,868
$73,816
$88,557
$103,297
$115,089
Alaska
60-79.99
69.0
$43,490
$47,672
$56,036
$64,400
$72,765
$81,129
$93,675
$102,039
$106,221
$127,132
$148,042
$164,771
Alaska
80-99.99
85.1
$44,328
$49,024
$58,416
$67,808
$77,200
$86,592
$100,679
$110,071
$114,767
$138,247
$161,726
$180,510
Alaska
100 <
145.0
$71,380
$78,727
$93,422
$108,118
$122,813
$137,508
$159,551
$174,246
$181,594
$218,332
$255,070
$284,460
Arizona
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arizona
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arizona
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arizona
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arizona
10-14.99
12.0
$11,203
$12,027
$13,675
$15,323
$16,972
$18,620
$21,092
$22,740
$23,564
$27,684
$31,805
$35,101
Arizona
15-19.99
17.0
$12,514
$13,373
$15,091
$16,809
$18,527
$20,245
$22,823
$24,541
$25,400
$29,695
$33,991
$37,427
Arizona
20-29.99
23.0
$21,403
$22,804
$25,606
$28,408
$31,211
$34,013
$38,216
$41,018
$42,419
$49,425
$56,430
$62,035
Arizona
30-39.99
34.0
$23,929
$25,407
$28,364
$31,320
$34,276
$37,232
$41,667
$44,623
$46,101
$53,492
$60,883
$66,796
1-270

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Arizona
40-59.99
46.0
$24,591
$26,394
$29,998
$33,602
$37,207
$40,811
$46,218
$49,822
$51,625
$60,636
$69,647
$76,856
Arizona
60-79.99
69.0
$35,984
$38,447
$43,374
$48,301
$53,227
$58,154
$65,544
$70,471
$72,934
$85,250
$97,567
$107,420
Arizona
80-99.99
85.1
$42,209
$44,785
$49,937
$55,089
$60,241
$65,393
$73,122
$78,274
$80,850
$93,730
$106,611
$116,915
Arizona
100 <
145.0
$56,488
$60,223
$67,695
$75,166
$82,637
$90,109
$101,316
$108,787
$112,523
$131,201
$149,879
$164,822
Arkansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Arkansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Arkansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Arkansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Arkansas
10-14.99
12.0
$12,677
$13,934
$16,449
$18,963
$21,478
$23,992
$27,764
$30,278
$31,535
$37,821
$44,107
$49,136
Arkansas
15-19.99
17.0
$15,056
$16,529
$19,474
$22,420
$25,365
$28,310
$32,729
$35,674
$37,147
$44,510
$51,873
$57,764
Arkansas
20-29.99
23.0
$24,315
$26,546
$31,009
$35,471
$39,934
$44,396
$51,090
$55,553
$57,784
$68,940
$80,097
$89,022
Arkansas
30-39.99
34.0
$29,014
$31,720
$37,130
$42,541
$47,952
$53,362
$61,479
$66,889
$69,595
$83,121
$96,648
$107,470
Arkansas
40-59.99
46.0
$30,110
$33,572
$40,497
$47,422
$54,348
$61,273
$71,660
$78,585
$82,048
$99,361
$116,673
$130,524
Arkansas
60-79.99
69.0
$44,262
$49,215
$59,123
$69,031
$78,938
$88,846
$103,707
$113,615
$118,569
$143,338
$168,107
$187,922
Arkansas
80-99.99
85.1
$45,280
$50,928
$62,223
$73,519
$84,814
$96,110
$113,053
$124,348
$129,996
$158,234
$186,473
$209,064
Arkansas
100 <
145.0
$73,001
$81,971
$99,909
$117,848
$135,787
$153,725
$180,633
$198,572
$207,541
$252,388
$297,235
$333,112
California
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
California
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
California
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
California
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
California
10-14.99
12.0
$12,360
$13,300
$15,179
$17,059
$18,938
$20,818
$23,637
$25,516
$26,456
$31,155
$35,854
$39,613
California
15-19.99
17.0
$14,607
$15,630
$17,676
$19,722
$21,768
$23,814
$26,883
$28,929
$29,952
$35,066
$40,181
$44,273
California
20-29.99
23.0
$23,707
$25,329
$28,575
$31,821
$35,067
$38,312
$43,181
$46,427
$48,050
$56,164
$64,278
$70,770
California
30-39.99
34.0
$28,115
$29,921
$33,533
$37,145
$40,757
$44,369
$49,787
$53,399
$55,205
$64,234
$73,264
$80,488
California
40-59.99
46.0
$28,893
$31,139
$35,630
$40,122
$44,613
$49,105
$55,842
$60,333
$62,579
$73,808
$85,036
$94,019
California
60-79.99
69.0
$42,436
$45,565
$51,822
$58,079
$64,337
$70,594
$79,980
$86,237
$89,365
$105,008
$120,651
$133,166
California
80-99.99
85.1
$43,029
$46,426
$53,219
$60,012
$66,805
$73,599
$83,788
$90,582
$93,978
$110,961
$127,944
$141,531
California
100 <
145.0
$69,166
$74,300
$84,567
$94,834
$105,102
$115,369
$130,770
$141,038
$146,172
$171,840
$197,509
$218,044
Colorado
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Colorado
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Colorado
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Colorado
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Colorado
10-14.99
12.0
$12,305
$13,189
$14,958
$16,727
$18,496
$20,265
$22,919
$24,688
$25,573
$29,995
$34,418
$37,956
1-271

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Colorado
15-19.99
17.0
$14,528
$15,473
$17,363
$19,252
$21,142
$23,031
$25,866
$27,755
$28,700
$33,424
$38,147
$41,927
Colorado
20-29.99
23.0
$23,601
$25,118
$28,152
$31,186
$34,220
$37,254
$41,805
$44,839
$46,356
$53,941
$61,526
$67,595
Colorado
30-39.99
34.0
$27,958
$29,608
$32,907
$36,206
$39,505
$42,804
$47,753
$51,052
$52,701
$60,949
$69,196
$75,795
Colorado
40-59.99
46.0
$28,681
$30,715
$34,783
$38,852
$42,920
$46,988
$53,090
$57,158
$59,192
$69,362
$79,533
$87,669
Colorado
60-79.99
69.0
$42,119
$44,930
$50,552
$56,174
$61,797
$67,419
$75,852
$81,474
$84,285
$98,341
$112,396
$123,640
Colorado
80-99.99
85.1
$42,638
$45,643
$51,653
$57,663
$63,673
$69,683
$78,698
$84,708
$87,713
$102,738
$117,763
$129,783
Colorado
100 <
145.0
$68,499
$72,965
$81,898
$90,831
$99,764
$108,697
$122,096
$131,029
$135,496
$157,828
$180,161
$198,027
Connecticut
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Connecticut
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Connecticut
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Connecticut
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Connecticut
10-14.99
12.0
$12,642
$13,865
$16,310
$18,754
$21,199
$23,644
$27,311
$29,756
$30,978
$37,090
$43,202
$48,092
Connecticut
15-19.99
17.0
$15,007
$16,430
$19,277
$22,124
$24,971
$27,817
$32,088
$34,934
$36,358
$43,475
$50,592
$56,285
Connecticut
20-29.99
23.0
$24,248
$26,413
$30,742
$35,071
$39,400
$43,729
$50,223
$54,552
$56,717
$67,540
$78,363
$87,021
Connecticut
30-39.99
34.0
$28,916
$31,522
$36,736
$41,949
$47,163
$52,376
$60,197
$65,410
$68,017
$81,051
$94,085
$104,512
Connecticut
40-59.99
46.0
$29,976
$33,305
$39,964
$46,622
$53,280
$59,939
$69,926
$76,584
$79,913
$96,559
$113,205
$126,521
Connecticut
60-79.99
69.0
$44,062
$48,815
$58,323
$67,830
$77,338
$86,845
$101,106
$110,614
$115,367
$139,136
$162,904
$181,919
Connecticut
80-99.99
85.1
$45,033
$50,434
$61,236
$72,038
$82,840
$93,642
$109,844
$120,646
$126,047
$153,052
$180,056
$201,660
Connecticut
100 <
145.0
$72,581
$81,130
$98,227
$115,325
$132,423
$149,520
$175,167
$192,264
$200,813
$243,557
$286,301
$320,497
Delaware
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Delaware
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Delaware
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Delaware
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Delaware
10-14.99
12.0
$12,627
$13,835
$16,249
$18,664
$21,078
$23,493
$27,115
$29,529
$30,736
$36,773
$42,809
$47,638
Delaware
15-19.99
17.0
$14,986
$16,388
$19,192
$21,995
$24,799
$27,603
$31,809
$34,613
$36,015
$43,025
$50,035
$55,643
Delaware
20-29.99
23.0
$24,219
$26,355
$30,626
$34,897
$39,168
$43,440
$49,846
$54,118
$56,253
$66,931
$77,609
$86,152
Delaware
30-39.99
34.0
$28,873
$31,437
$36,565
$41,692
$46,820
$51,948
$59,640
$64,768
$67,332
$80,151
$92,971
$103,227
Delaware
40-59.99
46.0
$29,918
$33,190
$39,732
$46,274
$52,817
$59,359
$69,173
$75,715
$78,986
$95,342
$111,698
$124,783
Delaware
60-79.99
69.0
$43,975
$48,641
$57,975
$67,309
$76,642
$85,976
$99,976
$109,310
$113,976
$137,310
$160,644
$179,311
Delaware
80-99.99
85.1
$44,926
$50,220
$60,807
$71,395
$81,982
$92,570
$108,451
$119,038
$124,332
$150,800
$177,269
$198,444
Delaware
100 <
145.0
$72,398
$80,764
$97,497
$114,229
$130,961
$147,694
$172,792
$189,524
$197,890
$239,721
$281,552
$315,017
District of
Columbia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-272

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
District of
Columbia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
District of
Columbia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
District of
Columbia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
District of
Columbia
10-14.99
12.0
$12,619
$13,819
$16,217
$18,616
$21,014
$23,413
$27,010
$29,409
$30,608
$36,604
$42,600
$47,397
District of
Columbia
15-19.99
17.0
$14,974
$16,365
$19,146
$21,927
$24,708
$27,490
$31,661
$34,443
$35,833
$42,786
$49,739
$55,302
District of
Columbia
20-29.99
23.0
$24,204
$26,324
$30,565
$34,805
$39,045
$43,286
$49,647
$53,887
$56,007
$66,608
$77,209
$85,690
District of
Columbia
30-39.99
34.0
$28,850
$31,391
$36,474
$41,556
$46,638
$51,721
$59,344
$64,427
$66,968
$79,674
$92,380
$102,545
District of
Columbia
40-59.99
46.0
$29,888
$33,128
$39,609
$46,090
$52,571
$59,052
$68,773
$75,254
$78,494
$94,696
$110,899
$123,860
District of
Columbia
60-79.99
69.0
$43,928
$48,549
$57,790
$67,032
$76,273
$85,514
$99,376
$108,618
$113,238
$136,342
$159,445
$177,928
District of
Columbia
80-99.99
85.1
$44,869
$50,106
$60,580
$71,053
$81,527
$92,001
$107,711
$118,185
$123,421
$149,606
$175,790
$196,737
District of
Columbia
100 <
145.0
$72,301
$80,571
$97,109
$113,647
$130,186
$146,724
$171,532
$188,070
$196,339
$237,685
$279,031
$312,108
Florida
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Florida
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Florida
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Florida
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Florida
10-14.99
12.0
$12,834
$14,247
$17,074
$19,901
$22,728
$25,555
$29,796
$32,623
$34,037
$41,104
$48,172
$53,826
Florida
15-19.99
17.0
$15,278
$16,972
$20,360
$23,749
$27,137
$30,525
$35,608
$38,996
$40,690
$49,161
$57,632
$64,409
Florida
20-29.99
23.0
$24,615
$27,146
$32,207
$37,269
$42,331
$47,393
$54,986
$60,048
$62,579
$75,233
$87,888
$98,012
Florida
30-39.99
34.0
$29,457
$32,606
$38,902
$45,199
$51,496
$57,792
$67,237
$73,534
$76,682
$92,424
$108,165
$120,759
Florida
40-59.99
46.0
$30,709
$34,771
$42,895
$51,018
$59,142
$67,266
$79,451
$87,575
$91,637
$111,946
$132,256
$148,503
Florida
60-79.99
69.0
$45,161
$51,013
$62,719
$74,425
$86,130
$97,836
$115,394
$127,100
$132,952
$162,216
$191,480
$214,891
Florida
80-99.99
85.1
$46,389
$53,145
$66,658
$80,171
$93,684
$107,197
$127,466
$140,979
$147,736
$181,518
$215,300
$242,326
Florida
100 <
145.0
$74,891
$85,749
$107,466
$129,183
$150,900
$172,617
$205,192
$226,909
$237,768
$292,060
$346,352
$389,786
Georgia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Georgia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Georgia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Georgia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Georgia
10-14.99
12.0
$12,712
$14,005
$16,590
$19,174
$21,759
$24,344
$28,221
$30,805
$32,098
$38,559
$45,021
$50,191
1-273

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Georgia
15-19.99
17.0
$15,106
$16,629
$19,674
$22,719
$25,764
$28,809
$33,376
$36,421
$37,944
$45,556
$53,169
$59,259
Georgia
20-29.99
23.0
$24,382
$26,681
$31,278
$35,876
$40,473
$45,070
$51,966
$56,564
$58,862
$70,356
$81,849
$91,044
Georgia
30-39.99
34.0
$29,114
$31,919
$37,529
$43,139
$48,749
$54,359
$62,774
$68,384
$71,189
$85,214
$99,239
$110,459
Georgia
40-59.99
46.0
$30,245
$33,842
$41,037
$48,231
$55,426
$62,621
$73,413
$80,607
$84,205
$102,192
$120,178
$134,568
Georgia
60-79.99
69.0
$44,464
$49,620
$59,932
$70,244
$80,556
$90,868
$106,336
$116,648
$121,804
$147,584
$173,364
$193,989
Georgia
80-99.99
85.1
$45,530
$51,427
$63,221
$75,015
$86,809
$98,603
$116,295
$128,089
$133,986
$163,472
$192,957
$216,545
Georgia
100 <
145.0
$73,426
$82,821
$101,609
$120,398
$139,186
$157,975
$186,157
$204,946
$214,340
$261,311
$308,283
$345,860
Hawaii
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Hawaii
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Hawaii
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Hawaii
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Hawaii
10-14.99
12.0
$12,359
$13,297
$15,175
$17,052
$18,929
$20,807
$23,623
$25,500
$26,438
$31,132
$35,825
$39,580
Hawaii
15-19.99
17.0
$14,605
$15,627
$17,669
$19,712
$21,755
$23,798
$26,862
$28,905
$29,926
$35,033
$40,141
$44,226
Hawaii
20-29.99
23.0
$23,704
$25,325
$28,567
$31,808
$35,050
$38,291
$43,153
$46,395
$48,016
$56,119
$64,223
$70,706
Hawaii
30-39.99
34.0
$28,112
$29,915
$33,520
$37,126
$40,732
$44,337
$49,746
$53,351
$55,154
$64,168
$73,183
$80,394
Hawaii
40-59.99
46.0
$28,889
$31,130
$35,613
$40,096
$44,579
$49,062
$55,786
$60,269
$62,511
$73,718
$84,926
$93,892
Hawaii
60-79.99
69.0
$42,430
$45,552
$51,797
$58,041
$64,286
$70,530
$79,897
$86,141
$89,263
$104,874
$120,486
$132,974
Hawaii
80-99.99
85.1
$43,021
$46,410
$53,187
$59,965
$66,742
$73,520
$83,686
$90,464
$93,852
$110,796
$127,740
$141,295
Hawaii
100 <
145.0
$69,152
$74,273
$84,513
$94,754
$104,995
$115,235
$130,596
$140,837
$145,957
$171,559
$197,160
$217,642
Idaho
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Idaho
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Idaho
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Idaho
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Idaho
10-14.99
12.0
$11,242
$12,105
$13,832
$15,558
$17,284
$19,010
$21,599
$23,326
$24,189
$28,504
$32,820
$36,272
Idaho
15-19.99
17.0
$11,528
$12,442
$14,271
$16,100
$17,929
$19,758
$22,501
$24,330
$25,244
$29,816
$34,388
$38,046
Idaho
20-29.99
23.0
$20,650
$22,126
$25,077
$28,029
$30,981
$33,933
$38,361
$41,313
$42,789
$50,169
$57,548
$63,452
Idaho
30-39.99
34.0
$21,958
$23,546
$26,724
$29,902
$33,079
$36,257
$41,023
$44,201
$45,790
$53,734
$61,678
$68,033
Idaho
40-59.99
46.0
$24,741
$26,693
$30,597
$34,501
$38,404
$42,308
$48,164
$52,068
$54,020
$63,779
$73,539
$81,346
Idaho
60-79.99
69.0
$36,209
$38,896
$44,272
$49,648
$55,024
$60,399
$68,463
$73,838
$76,526
$89,966
$103,405
$114,156
Idaho
80-99.99
85.1
$36,699
$39,552
$45,258
$50,964
$56,670
$62,376
$70,935
$76,641
$79,494
$93,759
$108,024
$119,436
Idaho
100 <
145.0
$49,244
$53,451
$61,866
$70,281
$78,696
$87,111
$99,734
$108,149
$112,356
$133,394
$154,431
$171,261
Illinois
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Illinois
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-274

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Illinois
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Illinois
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Illinois
10-14.99
12.0
$12,519
$13,618
$15,816
$18,013
$20,211
$22,409
$25,706
$27,903
$29,002
$34,497
$39,991
$44,387
Illinois
15-19.99
17.0
$14,832
$16,081
$18,577
$21,074
$23,571
$26,068
$29,813
$32,310
$33,559
$39,801
$46,043
$51,036
Illinois
20-29.99
23.0
$24,012
$25,939
$29,795
$33,651
$37,507
$41,362
$47,146
$51,002
$52,930
$62,569
$72,208
$79,920
Illinois
30-39.99
34.0
$28,566
$30,823
$35,336
$39,850
$44,364
$48,877
$55,648
$60,162
$62,419
$73,703
$84,987
$94,014
Illinois
40-59.99
46.0
$29,503
$32,359
$38,070
$43,782
$49,493
$55,205
$63,772
$69,483
$72,339
$86,618
$100,896
$112,319
Illinois
60-79.99
69.0
$43,351
$47,395
$55,482
$63,569
$71,657
$79,744
$91,875
$99,962
$104,006
$124,224
$144,442
$160,616
Illinois
80-99.99
85.1
$44,158
$48,683
$57,733
$66,783
$75,833
$84,884
$98,459
$107,509
$112,034
$134,660
$157,286
$175,386
Illinois
100 <
145.0
$71,089
$78,145
$92,258
$106,372
$120,485
$134,598
$155,767
$169,881
$176,937
$212,220
$247,503
$275,729
Indiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Indiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Indiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Indiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Indiana
10-14.99
12.0
$12,591
$13,762
$16,104
$18,446
$20,788
$23,130
$26,643
$28,986
$30,157
$36,012
$41,867
$46,551
Indiana
15-19.99
17.0
$14,934
$16,285
$18,986
$21,687
$24,389
$27,090
$31,142
$33,843
$35,194
$41,947
$48,700
$54,102
Indiana
20-29.99
23.0
$24,150
$26,216
$30,348
$34,481
$38,613
$42,745
$48,943
$53,076
$55,142
$65,473
$75,803
$84,068
Indiana
30-39.99
34.0
$28,770
$31,231
$36,154
$41,076
$45,999
$50,921
$58,305
$63,228
$65,689
$77,995
$90,301
$100,146
Indiana
40-59.99
46.0
$29,779
$32,912
$39,176
$45,441
$51,705
$57,970
$67,367
$73,631
$76,764
$92,425
$108,086
$120,615
Indiana
60-79.99
69.0
$43,766
$48,225
$57,141
$66,058
$74,975
$83,892
$97,267
$106,184
$110,642
$132,934
$155,227
$173,060
Indiana
80-99.99
85.1
$44,669
$49,706
$59,779
$69,853
$79,926
$90,000
$105,110
$115,183
$120,220
$145,403
$170,587
$190,734
Indiana
100 <
145.0
$71,960
$79,889
$95,745
$111,602
$127,458
$143,315
$167,099
$182,956
$190,884
$230,526
$270,167
$301,880
Iowa
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Iowa
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Iowa
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Iowa
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Iowa
10-14.99
12.0
$12,504
$13,588
$15,756
$17,923
$20,091
$22,259
$25,511
$27,678
$28,762
$34,182
$39,601
$43,937
Iowa
15-19.99
17.0
$14,811
$16,038
$18,492
$20,947
$23,401
$25,855
$29,537
$31,991
$33,219
$39,354
$45,490
$50,399
Iowa
20-29.99
23.0
$23,983
$25,882
$29,680
$33,478
$37,277
$41,075
$46,772
$50,571
$52,470
$61,965
$71,461
$79,057
Iowa
30-39.99
34.0
$28,523
$30,738
$35,166
$39,595
$44,024
$48,452
$55,096
$59,524
$61,739
$72,810
$83,882
$92,740
Iowa
40-59.99
46.0
$29,445
$32,244
$37,840
$43,437
$49,033
$54,630
$63,024
$68,621
$71,419
$85,410
$99,402
$110,595
Iowa
60-79.99
69.0
$43,265
$47,223
$55,137
$63,052
$70,967
$78,882
$90,754
$98,668
$102,626
$122,413
$142,199
$158,029
Iowa
80-99.99
85.1
$44,051
$48,470
$57,308
$66,145
$74,983
$83,820
$97,076
$105,914
$110,333
$132,426
$154,520
$172,195
1-275

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Iowa
100 <
145.0
$70,907
$77,783
$91,533
$105,284
$119,035
$132,786
$153,412
$167,162
$174,038
$208,414
$242,791
$270,292
Kansas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kansas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kansas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kansas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kansas
10-14.99
12.0
$12,559
$13,697
$15,974
$18,251
$20,528
$22,805
$26,220
$28,497
$29,635
$35,327
$41,020
$45,573
Kansas
15-19.99
17.0
$14,888
$16,193
$18,802
$21,410
$24,019
$26,628
$30,542
$33,151
$34,455
$40,977
$47,500
$52,718
Kansas
20-29.99
23.0
$24,087
$26,091
$30,098
$34,106
$38,113
$42,121
$48,132
$52,139
$54,143
$64,161
$74,179
$82,194
Kansas
30-39.99
34.0
$28,678
$31,047
$35,785
$40,522
$45,260
$49,998
$57,105
$61,843
$64,212
$76,056
$87,901
$97,377
Kansas
40-59.99
46.0
$29,655
$32,662
$38,677
$44,691
$50,706
$56,721
$65,743
$71,758
$74,765
$89,802
$104,839
$116,868
Kansas
60-79.99
69.0
$43,579
$47,850
$56,392
$64,934
$73,476
$82,018
$94,831
$103,374
$107,645
$129,000
$150,355
$167,439
Kansas
80-99.99
85.1
$44,438
$49,244
$58,855
$68,466
$78,078
$87,689
$102,106
$111,717
$116,523
$140,551
$164,579
$183,801
Kansas
100 <
145.0
$71,567
$79,101
$94,170
$109,239
$124,308
$139,377
$161,981
$177,050
$184,585
$222,257
$259,930
$290,068
Kentucky
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Kentucky
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Kentucky
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Kentucky
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Kentucky
10-14.99
12.0
$12,649
$13,878
$16,336
$18,793
$21,251
$23,709
$27,396
$29,853
$31,082
$37,227
$43,371
$48,287
Kentucky
15-19.99
17.0
$15,016
$16,449
$19,314
$22,179
$25,044
$27,910
$32,207
$35,073
$36,505
$43,668
$50,831
$56,561
Kentucky
20-29.99
23.0
$24,261
$26,438
$30,792
$35,146
$39,500
$43,854
$50,385
$54,739
$56,916
$67,801
$78,687
$87,395
Kentucky
30-39.99
34.0
$28,934
$31,559
$36,810
$42,060
$47,310
$52,561
$60,436
$65,687
$68,312
$81,438
$94,564
$105,064
Kentucky
40-59.99
46.0
$30,001
$33,355
$40,064
$46,772
$53,480
$60,188
$70,250
$76,958
$80,312
$97,083
$113,853
$127,269
Kentucky
60-79.99
69.0
$44,099
$48,890
$58,472
$68,054
$77,637
$87,219
$101,592
$111,175
$115,966
$139,921
$163,877
$183,041
Kentucky
80-99.99
85.1
$45,080
$50,527
$61,421
$72,315
$83,209
$94,103
$110,444
$121,338
$126,785
$154,020
$181,256
$203,044
Kentucky
100 <
145.0
$72,660
$81,287
$98,542
$115,797
$133,051
$150,306
$176,188
$193,443
$202,071
$245,208
$288,345
$322,854
Louisiana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Louisiana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Louisiana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Louisiana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Louisiana
10-14.99
12.0
$12,798
$14,177
$16,933
$19,690
$22,447
$25,203
$29,338
$32,095
$33,473
$40,365
$47,257
$52,770
Louisiana
15-19.99
17.0
$15,228
$16,872
$20,161
$23,450
$26,738
$30,027
$34,960
$38,248
$39,893
$48,114
$56,336
$62,913
Louisiana
20-29.99
23.0
$24,547
$27,011
$31,938
$36,865
$41,792
$46,718
$54,109
$59,036
$61,499
$73,817
$86,134
$95,988
Louisiana
30-39.99
34.0
$29,358
$32,406
$38,503
$44,601
$50,698
$56,795
$65,941
$72,038
$75,087
$90,330
$105,573
$117,767
1-276

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Louisiana
40-59.99
46.0
$30,574
$34,501
$42,355
$50,209
$58,063
$65,917
$77,698
$85,552
$89,478
$109,113
$128,748
$144,456
Louisiana
60-79.99
69.0
$44,958
$50,609
$61,910
$73,210
$84,511
$95,812
$112,763
$124,064
$129,715
$157,967
$186,219
$208,821
Louisiana
80-99.99
85.1
$46,139
$52,646
$65,660
$78,674
$91,687
$104,701
$124,222
$137,236
$143,742
$176,277
$208,811
$234,839
Louisiana
100 <
145.0
$74,465
$84,899
$105,765
$126,631
$147,498
$168,364
$199,664
$220,531
$230,964
$283,130
$335,296
$377,029
Maine
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maine
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maine
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maine
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maine
10-14.99
12.0
$12,613
$13,805
$16,190
$18,575
$20,960
$23,345
$26,923
$29,308
$30,501
$36,463
$42,426
$47,196
Maine
15-19.99
17.0
$14,965
$16,346
$19,108
$21,870
$24,632
$27,395
$31,538
$34,300
$35,681
$42,587
$49,492
$55,017
Maine
20-29.99
23.0
$24,191
$26,298
$30,513
$34,728
$38,943
$43,157
$49,479
$53,694
$55,802
$66,338
$76,875
$85,305
Maine
30-39.99
34.0
$28,831
$31,353
$36,398
$41,442
$46,486
$51,531
$59,097
$64,142
$66,664
$79,275
$91,886
$101,975
Maine
40-59.99
46.0
$29,862
$33,077
$39,506
$45,936
$52,365
$58,794
$68,439
$74,868
$78,083
$94,156
$110,230
$123,089
Maine
60-79.99
69.0
$43,890
$48,472
$57,636
$66,800
$75,965
$85,129
$98,875
$108,039
$112,621
$135,532
$158,442
$176,771
Maine
80-99.99
85.1
$44,822
$50,011
$60,389
$70,768
$81,146
$91,525
$107,093
$117,471
$122,660
$148,607
$174,553
$195,310
Maine
100 <
145.0
$72,220
$80,408
$96,785
$113,161
$129,537
$145,914
$170,478
$186,855
$195,043
$235,984
$276,924
$309,677
Maryland
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Maryland
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Maryland
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Maryland
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Maryland
10-14.99
12.0
$12,619
$13,819
$16,217
$18,616
$21,014
$23,413
$27,010
$29,409
$30,608
$36,604
$42,600
$47,397
Maryland
15-19.99
17.0
$14,974
$16,365
$19,146
$21,927
$24,708
$27,490
$31,661
$34,443
$35,833
$42,786
$49,739
$55,302
Maryland
20-29.99
23.0
$24,204
$26,324
$30,565
$34,805
$39,045
$43,286
$49,647
$53,887
$56,007
$66,608
$77,209
$85,690
Maryland
30-39.99
34.0
$28,850
$31,391
$36,474
$41,556
$46,638
$51,721
$59,344
$64,427
$66,968
$79,674
$92,380
$102,545
Maryland
40-59.99
46.0
$29,888
$33,128
$39,609
$46,090
$52,571
$59,052
$68,773
$75,254
$78,494
$94,696
$110,899
$123,860
Maryland
60-79.99
69.0
$43,928
$48,549
$57,790
$67,032
$76,273
$85,514
$99,376
$108,618
$113,238
$136,342
$159,445
$177,928
Maryland
80-99.99
85.1
$44,869
$50,106
$60,580
$71,053
$81,527
$92,001
$107,711
$118,185
$123,421
$149,606
$175,790
$196,737
Maryland
100 <
145.0
$72,301
$80,571
$97,109
$113,647
$130,186
$146,724
$171,532
$188,070
$196,339
$237,685
$279,031
$312,108
Massachusetts
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Massachusetts
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Massachusetts
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Massachusetts
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Massachusetts
10-14.99
12.0
$12,621
$13,821
$16,222
$18,623
$21,025
$23,426
$27,027
$29,428
$30,629
$36,632
$42,634
$47,437
1-277

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Massachusetts
15-19.99
17.0
$14,976
$16,369
$19,154
$21,938
$24,723
$27,508
$31,686
$34,470
$35,863
$42,825
$49,787
$55,357
Massachusetts
20-29.99
23.0
$24,206
$26,329
$30,575
$34,820
$39,066
$43,311
$49,679
$53,925
$56,047
$66,661
$77,275
$85,766
Massachusetts
30-39.99
34.0
$28,854
$31,399
$36,489
$41,578
$46,668
$51,758
$59,393
$64,482
$67,027
$79,752
$92,476
$102,656
Massachusetts
40-59.99
46.0
$29,893
$33,138
$39,629
$46,120
$52,611
$59,102
$68,838
$75,329
$78,574
$94,802
$111,029
$124,011
Massachusetts
60-79.99
69.0
$43,936
$48,564
$57,821
$67,077
$76,333
$85,590
$99,474
$108,731
$113,359
$136,500
$159,641
$178,153
Massachusetts
80-99.99
85.1
$44,879
$50,125
$60,617
$71,109
$81,601
$92,093
$107,832
$118,324
$123,570
$149,800
$176,031
$197,015
Massachusetts
100 <
145.0
$72,317
$80,602
$97,172
$113,742
$130,312
$146,882
$171,737
$188,307
$196,592
$238,018
$279,443
$312,583
Michigan
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Michigan
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Michigan
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Michigan
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Michigan
10-14.99
12.0
$12,489
$13,558
$15,696
$17,834
$19,971
$22,109
$25,316
$27,454
$28,523
$33,867
$39,212
$43,487
Michigan
15-19.99
17.0
$14,790
$15,996
$18,407
$20,819
$23,231
$25,643
$29,261
$31,673
$32,879
$38,909
$44,938
$49,762
Michigan
20-29.99
23.0
$23,954
$25,824
$29,565
$33,306
$37,047
$40,788
$46,399
$50,140
$52,010
$61,362
$70,714
$78,196
Michigan
30-39.99
34.0
$28,481
$30,653
$34,996
$39,340
$43,684
$48,028
$54,543
$58,887
$61,059
$71,919
$82,778
$91,466
Michigan
40-59.99
46.0
$29,388
$32,129
$37,610
$43,092
$48,574
$54,055
$62,277
$67,759
$70,500
$84,204
$97,908
$108,871
Michigan
60-79.99
69.0
$43,179
$47,050
$54,793
$62,535
$70,277
$78,020
$89,633
$97,376
$101,247
$120,603
$139,959
$155,443
Michigan
80-99.99
85.1
$43,945
$48,257
$56,882
$65,507
$74,132
$82,757
$95,694
$104,319
$108,632
$130,194
$151,756
$169,006
Michigan
100 <
145.0
$70,726
$77,421
$90,809
$104,197
$117,586
$130,974
$151,057
$164,446
$171,140
$204,611
$238,082
$264,859
Minnesota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Minnesota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Minnesota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Minnesota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Minnesota
10-14.99
12.0
$12,472
$13,525
$15,629
$17,734
$19,839
$21,943
$25,100
$27,205
$28,257
$33,519
$38,780
$42,990
Minnesota
15-19.99
17.0
$14,766
$15,949
$18,314
$20,678
$23,043
$25,408
$28,956
$31,321
$32,503
$38,415
$44,328
$49,057
Minnesota
20-29.99
23.0
$23,922
$25,761
$29,438
$33,115
$36,793
$40,470
$45,986
$49,663
$51,502
$60,695
$69,888
$77,242
Minnesota
30-39.99
34.0
$28,434
$30,559
$34,809
$39,058
$43,308
$47,558
$53,933
$58,183
$60,307
$70,932
$81,557
$90,056
Minnesota
40-59.99
46.0
$29,324
$32,002
$37,356
$42,711
$48,065
$53,420
$61,451
$66,806
$69,483
$82,869
$96,255
$106,964
Minnesota
60-79.99
69.0
$43,084
$46,860
$54,411
$61,963
$69,515
$77,066
$88,394
$95,946
$99,721
$118,601
$137,480
$152,583
Minnesota
80-99.99
85.1
$43,827
$48,022
$56,412
$64,802
$73,192
$81,581
$94,166
$102,556
$106,751
$127,725
$148,699
$165,479
Minnesota
100 <
145.0
$70,526
$77,020
$90,008
$102,995
$115,983
$128,971
$148,453
$161,440
$167,934
$200,404
$232,873
$258,849
Mississippi
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Mississippi
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
1-278

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Mississippi
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Mississippi
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Mississippi
10-14.99
12.0
$12,730
$14,040
$16,660
$19,280
$21,900
$24,520
$28,450
$31,070
$32,380
$38,929
$45,479
$50,719
Mississippi
15-19.99
17.0
$15,131
$16,679
$19,773
$22,868
$25,963
$29,058
$33,701
$36,795
$38,343
$46,080
$53,817
$60,007
Mississippi
20-29.99
23.0
$24,416
$26,749
$31,413
$36,078
$40,743
$45,408
$52,405
$57,070
$59,403
$71,065
$82,727
$92,057
Mississippi
30-39.99
34.0
$29,164
$32,019
$37,728
$43,438
$49,148
$54,858
$63,423
$69,132
$71,987
$86,262
$100,536
$111,956
Mississippi
40-59.99
46.0
$30,312
$33,977
$41,307
$48,636
$55,966
$63,296
$74,290
$81,620
$85,285
$103,609
$121,934
$136,593
Mississippi
60-79.99
69.0
$44,565
$49,822
$60,337
$70,852
$81,366
$91,881
$107,653
$118,167
$123,424
$149,711
$175,997
$197,027
Mississippi
80-99.99
85.1
$45,654
$51,676
$63,720
$75,764
$87,808
$99,852
$117,918
$129,962
$135,984
$166,094
$196,204
$220,292
Mississippi
100 <
145.0
$73,639
$83,246
$102,460
$121,674
$140,889
$160,103
$188,924
$208,138
$217,745
$265,780
$313,816
$352,244
Missour

1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Missour

3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Missour

5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Missour

7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Missour

10-14.99
12.0
$12,559
$13,698
$15,976
$18,254
$20,531
$22,809
$26,226
$28,504
$29,643
$35,337
$41,032
$45,588
Missour

15-19.99
17.0
$14,889
$16,194
$18,804
$21,414
$24,025
$26,635
$30,550
$33,161
$34,466
$40,991
$47,517
$52,738
Missour

20-29.99
23.0
$24,088
$26,093
$30,102
$34,111
$38,120
$42,130
$48,143
$52,152
$54,157
$64,180
$74,203
$82,221
Missour

30-39.99
34.0
$28,679
$31,049
$35,790
$40,530
$45,271
$50,011
$57,122
$61,863
$64,233
$76,084
$87,936
$97,417
Missour

40-59.99
46.0
$29,656
$32,666
$38,684
$44,702
$50,721
$56,739
$65,766
$71,785
$74,794
$89,840
$104,886
$116,922
Missour

60-79.99
69.0
$43,582
$47,855
$56,403
$64,950
$73,498
$82,045
$94,867
$103,414
$107,688
$129,057
$150,426
$167,521
Missour

80-99.99
85.1
$44,441
$49,250
$58,868
$68,486
$78,104
$87,722
$102,149
$111,767
$116,576
$140,621
$164,666
$183,902
Missour

100 <
145.0
$71,572
$79,113
$94,193
$109,273
$124,354
$139,434
$162,055
$177,135
$184,676
$222,377
$260,078
$290,239
Montana
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Montana
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Montana
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Montana
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Montana
10-14.99
12.0
$11,247
$12,115
$13,851
$15,587
$17,323
$19,058
$21,662
$23,398
$24,266
$28,606
$32,945
$36,417
Montana
15-19.99
17.0
$12,576
$13,497
$15,340
$17,182
$19,025
$20,867
$23,631
$25,473
$26,395
$31,001
$35,607
$39,292
Montana
20-29.99
23.0
$21,487
$22,972
$25,943
$28,913
$31,883
$34,854
$39,309
$42,280
$43,765
$51,191
$58,617
$64,558
Montana
30-39.99
34.0
$24,053
$25,656
$28,861
$32,066
$35,271
$38,476
$43,283
$46,488
$48,091
$56,103
$64,115
$70,525
Montana
40-59.99
46.0
$24,760
$26,730
$30,671
$34,612
$38,553
$42,493
$48,405
$52,345
$54,316
$64,168
$74,020
$81,902
Montana
60-79.99
69.0
$36,236
$38,952
$44,383
$49,815
$55,246
$60,677
$68,824
$74,255
$76,971
$90,549
$104,127
$114,990
Montana
80-99.99
85.1
$36,733
$39,620
$45,395
$51,169
$56,944
$62,718
$71,380
$77,155
$80,042
$94,478
$108,915
$120,464
1-279

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Montana
100 <
145.0
$57,018
$61,284
$69,816
$78,347
$86,879
$95,411
$108,209
$116,740
$121,006
$142,336
$163,665
$180,729
Nebraska
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nebraska
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nebraska
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nebraska
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nebraska
10-14.99
12.0
$12,468
$13,515
$15,610
$17,705
$19,800
$21,895
$25,038
$27,133
$28,181
$33,418
$38,656
$42,846
Nebraska
15-19.99
17.0
$14,759
$15,935
$18,286
$20,638
$22,989
$25,340
$28,867
$31,219
$32,394
$38,273
$44,151
$48,854
Nebraska
20-29.99
23.0
$23,913
$25,743
$29,401
$33,060
$36,719
$40,378
$45,866
$49,525
$51,354
$60,502
$69,649
$76,966
Nebraska
30-39.99
34.0
$28,420
$30,532
$34,754
$38,977
$43,199
$47,422
$53,756
$57,979
$60,090
$70,647
$81,203
$89,649
Nebraska
40-59.99
46.0
$29,306
$31,965
$37,283
$42,600
$47,918
$53,236
$61,212
$66,530
$69,189
$82,483
$95,777
$106,413
Nebraska
60-79.99
69.0
$43,056
$46,804
$54,301
$61,797
$69,294
$76,791
$88,035
$95,532
$99,280
$118,022
$136,763
$151,756
Nebraska
80-99.99
85.1
$43,793
$47,954
$56,276
$64,598
$72,919
$81,241
$93,724
$102,046
$106,206
$127,011
$147,815
$164,459
Nebraska
100 <
145.0
$70,468
$76,904
$89,776
$102,648
$115,520
$128,391
$147,699
$160,571
$167,007
$199,187
$231,366
$257,110
Nevada
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Nevada
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Nevada
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Nevada
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Nevada
10-14.99
12.0
$10,747
$11,528
$13,091
$14,654
$16,217
$17,780
$20,124
$21,687
$22,469
$26,376
$30,283
$33,409
Nevada
15-19.99
17.0
$11,412
$12,211
$13,809
$15,406
$17,004
$18,601
$20,998
$22,595
$23,394
$27,388
$31,381
$34,576
Nevada
20-29.99
23.0
$20,493
$21,813
$24,452
$27,091
$29,730
$32,369
$36,327
$38,966
$40,286
$46,883
$53,481
$58,759
Nevada
30-39.99
34.0
$21,726
$23,084
$25,799
$28,514
$31,229
$33,944
$38,017
$40,732
$42,089
$48,877
$55,664
$61,094
Nevada
40-59.99
46.0
$24,428
$26,067
$29,345
$32,623
$35,901
$39,179
$44,096
$47,374
$49,013
$57,208
$65,403
$71,959
Nevada
60-79.99
69.0
$35,739
$37,958
$42,395
$46,832
$51,269
$55,706
$62,361
$66,798
$69,017
$80,109
$91,201
$100,075
Nevada
80-99.99
85.1
$36,120
$38,394
$42,942
$47,490
$52,039
$56,587
$63,409
$67,957
$70,232
$81,602
$92,973
$102,069
Nevada
100 <
145.0
$48,257
$51,478
$57,921
$64,363
$70,805
$77,248
$86,911
$93,354
$96,575
$112,680
$128,786
$141,671
New
Hampshire
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New
Hampshire
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New
Hampshire
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New
Hampshire
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New
Hampshire
10-14.99
12.0
$12,597
$13,774
$16,128
$18,482
$20,835
$23,189
$26,720
$29,074
$30,251
$36,135
$42,020
$46,728
1-280

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New
Hampshire
15-19.99
17.0
$14,943
$16,302
$19,020
$21,737
$24,455
$27,173
$31,250
$33,968
$35,327
$42,122
$48,917
$54,353
New
Hampshire
20-29.99
23.0
$24,161
$26,239
$30,393
$34,548
$38,703
$42,858
$49,090
$53,245
$55,322
$65,710
$76,097
$84,406
New
Hampshire
30-39.99
34.0
$28,787
$31,265
$36,221
$41,176
$46,132
$51,088
$58,522
$63,478
$65,956
$78,345
$90,735
$100,647
New
Hampshire
40-59.99
46.0
$29,802
$32,957
$39,267
$45,576
$51,886
$58,196
$67,660
$73,970
$77,125
$92,899
$108,673
$121,293
New
Hampshire
60-79.99
69.0
$43,800
$48,292
$57,277
$66,261
$75,246
$84,231
$97,707
$106,692
$111,184
$133,646
$156,107
$174,076
New
Hampshire
80-99.99
85.1
$44,711
$49,789
$59,946
$70,103
$80,260
$90,417
$105,653
$115,810
$120,888
$146,280
$171,673
$191,987
New
Hampshire
100 <
145.0
$72,032
$80,031
$96,030
$112,029
$128,027
$144,026
$168,025
$184,023
$192,023
$232,020
$272,017
$304,015
New Jersey
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Jersey
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Jersey
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Jersey
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Jersey
10-14.99
12.0
$12,671
$13,921
$16,422
$18,923
$21,423
$23,924
$27,676
$30,176
$31,427
$37,679
$43,931
$48,933
New Jersey
15-19.99
17.0
$15,047
$16,510
$19,436
$22,362
$25,288
$28,215
$32,604
$35,530
$36,993
$44,309
$51,624
$57,477
New Jersey
20-29.99
23.0
$24,302
$26,520
$30,957
$35,394
$39,830
$44,267
$50,922
$55,358
$57,577
$68,668
$79,760
$88,633
New Jersey
30-39.99
34.0
$28,995
$31,681
$37,054
$42,426
$47,798
$53,171
$61,229
$66,602
$69,288
$82,719
$96,150
$106,895
New Jersey
40-59.99
46.0
$30,084
$33,520
$40,394
$47,267
$54,140
$61,013
$71,323
$78,196
$81,633
$98,816
$115,999
$129,746
New Jersey
60-79.99
69.0
$44,223
$49,138
$58,967
$68,797
$78,627
$88,457
$103,202
$113,032
$117,947
$142,521
$167,096
$186,755
New Jersey
80-99.99
85.1
$45,232
$50,832
$62,031
$73,231
$84,430
$95,630
$112,429
$123,629
$129,228
$157,227
$185,226
$207,625
New Jersey
100 <
145.0
$72,920
$81,807
$99,582
$117,358
$135,133
$152,908
$179,571
$197,346
$206,233
$250,671
$295,109
$330,660
New Mexico
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New Mexico
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New Mexico
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New Mexico
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New Mexico
10-14.99
12.0
$12,328
$13,236
$15,052
$16,867
$18,683
$20,499
$23,222
$25,038
$25,946
$30,485
$35,025
$38,656
New Mexico
15-19.99
17.0
$12,633
$13,610
$15,566
$17,522
$19,477
$21,433
$24,366
$26,322
$27,300
$32,189
$37,078
$40,989
New Mexico
20-29.99
23.0
$21,563
$23,125
$26,249
$29,372
$32,496
$35,619
$40,305
$43,428
$44,990
$52,799
$60,607
$66,855
New Mexico
30-39.99
34.0
$24,167
$25,882
$29,313
$32,745
$36,176
$39,607
$44,754
$48,186
$49,901
$58,479
$67,058
$73,920
New Mexico
40-59.99
46.0
$24,913
$27,036
$31,283
$35,530
$39,777
$44,024
$50,395
$54,642
$56,766
$67,383
$78,001
$86,495
New Mexico
60-79.99
69.0
$36,466
$39,411
$45,302
$51,192
$57,083
$62,974
$71,809
$77,700
$80,645
$95,372
$110,098
$121,879
1-281

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
New Mexico
80-99.99
85.1
$42,803
$45,974
$52,315
$58,656
$64,997
$71,338
$80,849
$87,190
$90,361
$106,213
$122,066
$134,748
New Mexico
100 <
145.0
$68,781
$73,529
$83,026
$92,523
$102,020
$111,517
$125,762
$135,259
$140,008
$163,750
$187,493
$206,487
New York
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
New York
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
New York
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
New York
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
New York
10-14.99
12.0
$12,561
$13,702
$15,984
$18,265
$20,547
$22,829
$26,251
$28,533
$29,674
$35,378
$41,083
$45,646
New York
15-19.99
17.0
$14,892
$16,200
$18,815
$21,431
$24,047
$26,663
$30,586
$33,202
$34,510
$41,050
$47,589
$52,821
New York
20-29.99
23.0
$24,092
$26,100
$30,117
$34,134
$38,150
$42,167
$48,192
$52,209
$54,217
$64,259
$74,301
$82,334
New York
30-39.99
34.0
$28,685
$31,061
$35,812
$40,564
$45,315
$50,067
$57,194
$61,946
$64,322
$76,201
$88,080
$97,583
New York
40-59.99
46.0
$29,664
$32,681
$38,714
$44,747
$50,781
$56,814
$65,864
$71,897
$74,914
$89,998
$105,081
$117,148
New York
60-79.99
69.0
$43,593
$47,878
$56,448
$65,018
$73,588
$82,158
$95,013
$103,583
$107,868
$129,293
$150,718
$167,859
New York
80-99.99
85.1
$44,455
$49,278
$58,924
$68,570
$78,215
$87,861
$102,330
$111,975
$116,798
$140,913
$165,027
$184,318
New York
100 <
145.0
$71,596
$79,160
$94,288
$109,415
$124,543
$139,671
$162,363
$177,491
$185,054
$222,874
$260,693
$290,949
North Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Carolina
10-14.99
12.0
$12,629
$13,838
$16,256
$18,675
$21,093
$23,511
$27,138
$29,556
$30,765
$36,811
$42,856
$47,692
North Carolina
15-19.99
17.0
$14,988
$16,393
$19,202
$22,011
$24,820
$27,629
$31,843
$34,652
$36,056
$43,079
$50,101
$55,719
North Carolina
20-29.99
23.0
$24,223
$26,362
$30,640
$34,918
$39,196
$43,474
$49,892
$54,170
$56,309
$67,004
$77,699
$86,256
North Carolina
30-39.99
34.0
$28,878
$31,447
$36,585
$41,723
$46,861
$51,999
$59,707
$64,845
$67,414
$80,259
$93,104
$103,380
North Carolina
40-59.99
46.0
$29,925
$33,203
$39,760
$46,316
$52,872
$59,428
$69,263
$75,819
$79,097
$95,488
$111,879
$124,991
North Carolina
60-79.99
69.0
$43,985
$48,662
$58,017
$67,371
$76,725
$86,080
$100,111
$109,466
$114,143
$137,529
$160,915
$179,624
North Carolina
80-99.99
85.1
$44,939
$50,246
$60,859
$71,472
$82,085
$92,698
$108,618
$119,231
$124,537
$151,070
$177,603
$198,829
North Carolina
100 <
145.0
$72,420
$80,808
$97,584
$114,360
$131,136
$147,912
$173,076
$189,852
$198,240
$240,180
$282,121
$315,673
North Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
North Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
North Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
North Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
North Dakota
10-14.99
12.0
$12,335
$13,250
$15,079
$16,908
$18,738
$20,567
$23,311
$25,141
$26,056
$30,629
$35,203
$38,862
North Dakota
15-19.99
17.0
$12,642
$13,630
$15,605
$17,580
$19,555
$21,530
$24,492
$26,467
$27,455
$32,392
$37,330
$41,280
North Dakota
20-29.99
23.0
$23,659
$25,233
$28,383
$31,533
$34,683
$37,832
$42,557
$45,707
$47,282
$55,156
$63,030
$69,330
1-282

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
North Dakota
30-39.99
34.0
$24,186
$25,921
$29,391
$32,861
$36,331
$39,801
$45,006
$48,476
$50,211
$58,886
$67,562
$74,502
North Dakota
40-59.99
46.0
$28,797
$30,947
$35,246
$39,546
$43,845
$48,145
$54,594
$58,893
$61,043
$71,792
$82,540
$91,139
North Dakota
60-79.99
69.0
$42,292
$45,277
$51,246
$57,215
$63,185
$69,154
$78,108
$84,077
$87,062
$101,985
$116,908
$128,846
North Dakota
80-99.99
85.1
$42,852
$46,071
$52,509
$58,947
$65,385
$71,823
$81,480
$87,918
$91,137
$107,232
$123,327
$136,203
North Dakota
100 <
145.0
$68,863
$73,694
$83,357
$93,019
$102,681
$112,344
$126,837
$136,499
$141,330
$165,486
$189,642
$208,966
Ohio
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Ohio
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Ohio
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Ohio
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Ohio
10-14.99
12.0
$12,571
$13,721
$16,022
$18,323
$20,623
$22,924
$26,376
$28,676
$29,827
$35,579
$41,331
$45,933
Ohio
15-19.99
17.0
$14,905
$16,227
$18,869
$21,512
$24,155
$26,798
$30,762
$33,405
$34,727
$41,334
$47,941
$53,227
Ohio
20-29.99
23.0
$24,110
$26,137
$30,190
$34,244
$38,297
$42,350
$48,430
$52,483
$54,510
$64,643
$74,776
$82,883
Ohio
30-39.99
34.0
$28,712
$31,115
$35,920
$40,726
$45,532
$50,338
$57,546
$62,352
$64,755
$76,769
$88,783
$98,395
Ohio
40-59.99
46.0
$29,700
$32,754
$38,860
$44,967
$51,073
$57,180
$66,340
$72,446
$75,500
$90,766
$106,033
$118,246
Ohio
60-79.99
69.0
$43,648
$47,988
$56,667
$65,347
$74,027
$82,707
$95,727
$104,407
$108,747
$130,446
$152,146
$169,505
Ohio
80-99.99
85.1
$44,523
$49,414
$59,195
$68,976
$78,757
$88,538
$103,210
$112,991
$117,882
$142,334
$166,787
$186,350
Ohio
100 <
145.0
$71,711
$79,391
$94,749
$110,108
$125,466
$140,825
$163,862
$179,221
$186,900
$225,296
$263,693
$294,410
Oklahoma
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oklahoma
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oklahoma
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oklahoma
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Oklahoma
10-14.99
12.0
$12,517
$13,613
$15,806
$17,999
$20,191
$22,384
$25,673
$27,866
$28,963
$34,445
$39,927
$44,312
Oklahoma
15-19.99
17.0
$14,829
$16,074
$18,563
$21,053
$23,543
$26,033
$29,767
$32,257
$33,502
$39,727
$45,951
$50,931
Oklahoma
20-29.99
23.0
$24,007
$25,930
$29,776
$33,622
$37,469
$41,315
$47,084
$50,930
$52,853
$62,469
$72,084
$79,777
Oklahoma
30-39.99
34.0
$28,559
$30,809
$35,308
$39,808
$44,307
$48,807
$55,556
$60,056
$62,306
$73,555
$84,804
$93,803
Oklahoma
40-59.99
46.0
$29,493
$32,340
$38,032
$43,724
$49,417
$55,109
$63,648
$69,340
$72,187
$86,418
$100,649
$112,033
Oklahoma
60-79.99
69.0
$43,337
$47,366
$55,425
$63,484
$71,542
$79,601
$91,689
$99,747
$103,777
$123,923
$144,070
$160,187
Oklahoma
80-99.99
85.1
$44,140
$48,647
$57,662
$66,677
$75,692
$84,707
$98,230
$107,245
$111,752
$134,290
$156,827
$174,857
Oklahoma
100 <
145.0
$71,059
$78,085
$92,138
$106,191
$120,244
$134,297
$155,377
$169,430
$176,456
$211,589
$246,722
$274,828
Oregon
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Oregon
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Oregon
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Oregon
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-283

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Oregon
10-14.99
12.0
$12,602
$13,785
$16,149
$18,514
$20,878
$23,243
$26,790
$29,154
$30,336
$36,248
$42,159
$46,888
Oregon
15-19.99
17.0
$14,950
$16,317
$19,050
$21,783
$24,516
$27,249
$31,349
$34,082
$35,448
$42,281
$49,114
$54,580
Oregon
20-29.99
23.0
$24,171
$26,259
$30,434
$34,610
$38,785
$42,961
$49,224
$53,399
$55,487
$65,925
$76,363
$84,714
Oregon
30-39.99
34.0
$28,802
$31,295
$36,281
$41,267
$46,254
$51,240
$58,719
$63,705
$66,198
$78,664
$91,129
$101,102
Oregon
40-59.99
46.0
$29,823
$32,998
$39,349
$45,699
$52,050
$58,401
$67,927
$74,278
$77,453
$93,330
$109,207
$121,908
Oregon
60-79.99
69.0
$43,831
$48,354
$57,400
$66,446
$75,492
$84,538
$98,107
$107,154
$111,677
$134,292
$156,907
$174,999
Oregon
80-99.99
85.1
$44,749
$49,865
$60,098
$70,331
$80,564
$90,797
$106,146
$116,379
$121,495
$147,078
$172,660
$193,125
Oregon
100 <
145.0
$72,096
$80,160
$96,288
$112,417
$128,545
$144,673
$168,865
$184,994
$193,058
$233,378
$273,699
$305,955
Pennsylvania
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Pennsylvania
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Pennsylvania
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Pennsylvania
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Pennsylvania
10-14.99
12.0
$12,612
$13,804
$16,188
$18,572
$20,956
$23,340
$26,916
$29,300
$30,492
$36,452
$42,412
$47,180
Pennsylvania
15-19.99
17.0
$14,964
$16,344
$19,105
$21,866
$24,626
$27,387
$31,528
$34,288
$35,669
$42,570
$49,472
$54,993
Pennsylvania
20-29.99
23.0
$24,190
$26,296
$30,509
$34,722
$38,934
$43,147
$49,466
$53,678
$55,785
$66,316
$76,848
$85,273
Pennsylvania
30-39.99
34.0
$28,830
$31,350
$36,391
$41,433
$46,474
$51,515
$59,077
$64,118
$66,639
$79,242
$91,845
$101,928
Pennsylvania
40-59.99
46.0
$29,860
$33,072
$39,498
$45,923
$52,348
$58,773
$68,411
$74,837
$78,049
$94,112
$110,175
$123,026
Pennsylvania
60-79.99
69.0
$43,887
$48,466
$57,624
$66,781
$75,939
$85,097
$98,834
$107,992
$112,571
$135,465
$158,360
$176,676
Pennsylvania
80-99.99
85.1
$44,818
$50,003
$60,374
$70,745
$81,115
$91,486
$107,042
$117,413
$122,598
$148,525
$174,452
$195,193
Pennsylvania
100 <
145.0
$72,214
$80,395
$96,758
$113,121
$129,484
$145,847
$170,392
$186,755
$194,936
$235,844
$276,752
$309,478
Rhode Island
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Rhode Island
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Rhode Island
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Rhode Island
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Rhode Island
10-14.99
12.0
$12,646
$13,872
$16,324
$18,776
$21,228
$23,680
$27,357
$29,809
$31,035
$37,165
$43,295
$48,198
Rhode Island
15-19.99
17.0
$15,012
$16,441
$19,297
$22,154
$25,011
$27,868
$32,153
$35,010
$36,438
$43,581
$50,723
$56,436
Rhode Island
20-29.99
23.0
$24,255
$26,426
$30,769
$35,112
$39,455
$43,798
$50,312
$54,655
$56,826
$67,683
$78,540
$87,226
Rhode Island
30-39.99
34.0
$28,926
$31,543
$36,776
$42,010
$47,244
$52,477
$60,328
$65,562
$68,178
$81,263
$94,347
$104,814
Rhode Island
40-59.99
46.0
$29,990
$33,333
$40,018
$46,704
$53,390
$60,075
$70,103
$76,789
$80,132
$96,846
$113,560
$126,931
Rhode Island
60-79.99
69.0
$44,082
$48,856
$58,405
$67,953
$77,501
$87,050
$101,372
$110,921
$115,695
$139,566
$163,437
$182,533
Rhode Island
80-99.99
85.1
$45,059
$50,485
$61,337
$72,189
$83,042
$93,894
$110,173
$121,025
$126,451
$153,582
$180,713
$202,417
Rhode Island
100 <
145.0
$72,624
$81,216
$98,399
$115,583
$132,767
$149,950
$175,726
$192,910
$201,502
$244,461
$287,420
$321,787
South Carolina
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
1-284

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
South Carolina
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Carolina
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Carolina
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Carolina
10-14.99
12.0
$12,654
$13,887
$16,355
$18,822
$21,289
$23,757
$27,458
$29,925
$31,158
$37,327
$43,495
$48,430
South Carolina
15-19.99
17.0
$15,023
$16,462
$19,341
$22,220
$25,098
$27,977
$32,295
$35,174
$36,613
$43,810
$51,006
$56,764
South Carolina
20-29.99
23.0
$24,270
$26,456
$30,828
$35,201
$39,573
$43,945
$50,504
$54,876
$57,062
$67,993
$78,924
$87,669
South Carolina
30-39.99
34.0
$28,948
$31,586
$36,864
$42,141
$47,418
$52,696
$60,612
$65,889
$68,528
$81,721
$94,914
$105,469
South Carolina
40-59.99
46.0
$30,020
$33,392
$40,136
$46,881
$53,626
$60,370
$70,487
$77,232
$80,604
$97,466
$114,328
$127,817
South Carolina
60-79.99
69.0
$44,126
$48,945
$58,582
$68,219
$77,856
$87,493
$101,948
$111,585
$116,403
$140,496
$164,588
$183,862
South Carolina
80-99.99
85.1
$45,113
$50,594
$61,556
$72,517
$83,479
$94,440
$110,883
$121,844
$127,325
$154,729
$182,133
$204,056
South Carolina
100 <
145.0
$72,717
$81,402
$98,772
$116,142
$133,511
$150,881
$176,936
$194,306
$202,991
$246,416
$289,840
$324,580
South Dakota
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
South Dakota
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
South Dakota
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
South Dakota
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
South Dakota
10-14.99
12.0
$12,335
$13,250
$15,079
$16,909
$18,739
$20,568
$23,313
$25,142
$26,057
$30,631
$35,205
$38,865
South Dakota
15-19.99
17.0
$14,571
$15,559
$17,534
$19,510
$21,485
$23,460
$26,423
$28,398
$29,386
$34,324
$39,263
$43,213
South Dakota
20-29.99
23.0
$23,659
$25,234
$28,384
$31,534
$34,684
$37,834
$42,559
$45,710
$47,285
$55,160
$63,035
$69,335
South Dakota
30-39.99
34.0
$28,044
$29,780
$33,250
$36,721
$40,191
$43,662
$48,868
$52,338
$54,074
$62,750
$71,427
$78,368
South Dakota
40-59.99
46.0
$28,797
$30,947
$35,248
$39,548
$43,848
$48,148
$54,599
$58,899
$61,049
$71,800
$82,550
$91,151
South Dakota
60-79.99
69.0
$42,293
$45,278
$51,249
$57,219
$63,189
$69,160
$78,115
$84,085
$87,071
$101,997
$116,922
$128,863
South Dakota
80-99.99
85.1
$42,852
$46,072
$52,511
$58,951
$65,390
$71,830
$81,489
$87,928
$91,148
$107,247
$123,345
$136,224
South Dakota
100 <
145.0
$68,864
$73,697
$83,361
$93,026
$102,691
$112,355
$126,852
$136,517
$141,349
$165,511
$189,673
$209,002
Tennessee
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Tennessee
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Tennessee
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Tennessee
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Tennessee
10-14.99
12.0
$12,661
$13,902
$16,383
$18,865
$21,346
$23,828
$27,550
$30,032
$31,273
$37,477
$43,681
$48,644
Tennessee
15-19.99
17.0
$15,033
$16,483
$19,382
$22,280
$25,179
$28,078
$32,427
$35,326
$36,775
$44,022
$51,270
$57,067
Tennessee
20-29.99
23.0
$24,284
$26,483
$30,883
$35,283
$39,682
$44,082
$50,682
$55,081
$57,281
$68,281
$79,280
$88,079
Tennessee
30-39.99
34.0
$28,968
$31,627
$36,945
$42,262
$47,580
$52,898
$60,875
$66,193
$68,851
$82,146
$95,441
$106,076
Tennessee
40-59.99
46.0
$30,047
$33,447
$40,246
$47,045
$53,845
$60,644
$70,843
$77,643
$81,042
$98,041
$115,039
$128,638
Tennessee
60-79.99
69.0
$44,167
$49,027
$58,746
$68,465
$78,184
$87,903
$102,482
$112,201
$117,061
$141,358
$165,656
$185,094
1-285

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Tennessee
80-99.99
85.1
$45,164
$50,695
$61,758
$72,821
$83,884
$94,947
$111,541
$122,604
$128,136
$155,793
$183,450
$205,576
Tennessee
100 <
145.0
$72,803
$81,575
$99,117
$116,659
$134,202
$151,744
$178,058
$195,601
$204,372
$248,228
$292,084
$327,169
Texas
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Texas
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Texas
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Texas
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Texas
10-14.99
12.0
$12,513
$13,607
$15,793
$17,979
$20,166
$22,352
$25,632
$27,818
$28,912
$34,378
$39,844
$44,217
Texas
15-19.99
17.0
$14,824
$16,065
$18,545
$21,026
$23,507
$25,988
$29,709
$32,190
$33,430
$39,632
$45,834
$50,796
Texas
20-29.99
23.0
$24,001
$25,918
$29,752
$33,586
$37,420
$41,254
$47,005
$50,839
$52,756
$62,341
$71,926
$79,594
Texas
30-39.99
34.0
$28,550
$30,791
$35,272
$39,754
$44,235
$48,717
$55,439
$59,921
$62,162
$73,366
$84,570
$93,533
Texas
40-59.99
46.0
$29,481
$32,315
$37,983
$43,651
$49,319
$54,988
$63,490
$69,158
$71,992
$86,162
$100,332
$111,668
Texas
60-79.99
69.0
$43,319
$47,330
$55,352
$63,374
$71,396
$79,418
$91,451
$99,473
$103,485
$123,540
$143,595
$159,639
Texas
80-99.99
85.1
$44,117
$48,602
$57,572
$66,542
$75,512
$84,482
$97,937
$106,907
$111,392
$133,817
$156,241
$174,181
Texas
100 <
145.0
$71,020
$78,008
$91,985
$105,961
$119,937
$133,913
$154,878
$168,854
$175,842
$210,783
$245,724
$273,676
Utah
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Utah
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Utah
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Utah
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Utah
10-14.99
12.0
$11,277
$12,175
$13,972
$15,768
$17,564
$19,360
$22,055
$23,851
$24,749
$29,239
$33,730
$37,322
Utah
15-19.99
17.0
$12,619
$13,583
$15,511
$17,439
$19,367
$21,295
$24,187
$26,115
$27,079
$31,898
$36,718
$40,574
Utah
20-29.99
23.0
$21,545
$23,088
$26,174
$29,260
$32,346
$35,432
$40,061
$43,147
$44,690
$52,406
$60,121
$66,293
Utah
30-39.99
34.0
$24,139
$25,827
$29,203
$32,579
$35,955
$39,331
$44,395
$47,771
$49,459
$57,898
$66,338
$73,090
Utah
40-59.99
46.0
$24,875
$26,961
$31,134
$35,306
$39,478
$43,650
$49,908
$54,081
$56,167
$66,597
$77,027
$85,372
Utah
60-79.99
69.0
$36,410
$39,299
$45,077
$50,856
$56,634
$62,412
$71,079
$76,858
$79,747
$94,193
$108,638
$120,195
Utah
80-99.99
85.1
$42,734
$45,835
$52,038
$58,240
$64,443
$70,645
$79,949
$86,151
$89,253
$104,759
$120,265
$132,670
Utah
100 <
145.0
$57,383
$62,013
$71,274
$80,535
$89,796
$99,057
$112,948
$122,209
$126,840
$149,992
$173,145
$191,667
Vermont
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Vermont
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Vermont
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Vermont
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Vermont
10-14.99
12.0
$12,529
$13,639
$15,857
$18,076
$20,295
$22,513
$25,841
$28,060
$29,169
$34,716
$40,262
$44,700
Vermont
15-19.99
17.0
$14,847
$16,110
$18,636
$21,163
$23,689
$26,216
$30,005
$32,532
$33,795
$40,111
$46,427
$51,480
Vermont
20-29.99
23.0
$24,032
$25,979
$29,875
$33,771
$37,667
$41,562
$47,406
$51,302
$53,249
$62,989
$72,728
$80,519
1-286

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
Vermont
30-39.99
34.0
$28,595
$30,882
$35,454
$40,027
$44,600
$49,173
$56,032
$60,605
$62,891
$74,323
$85,755
$94,901
Vermont
40-59.99
46.0
$29,543
$32,439
$38,230
$44,021
$49,813
$55,604
$64,291
$70,083
$72,979
$87,457
$101,936
$113,518
Vermont
60-79.99
69.0
$43,411
$47,515
$55,722
$63,929
$72,136
$80,343
$92,654
$100,861
$104,965
$125,483
$146,000
$162,415
Vermont
80-99.99
85.1
$44,232
$48,831
$58,029
$67,227
$76,425
$85,623
$99,420
$108,618
$113,217
$136,213
$159,208
$177,604
Vermont
100 <
145.0
$71,215
$78,397
$92,762
$107,127
$121,493
$135,858
$157,405
$171,770
$178,953
$214,866
$250,779
$279,509
Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Virginia
10-14.99
12.0
$12,598
$13,777
$16,133
$18,490
$20,846
$23,203
$26,738
$29,094
$30,272
$36,164
$42,055
$46,768
Virginia
15-19.99
17.0
$14,945
$16,305
$19,027
$21,749
$24,471
$27,192
$31,275
$33,997
$35,358
$42,162
$48,966
$54,410
Virginia
20-29.99
23.0
$24,164
$26,244
$30,404
$34,564
$38,724
$42,884
$49,124
$53,284
$55,364
$65,764
$76,164
$84,484
Virginia
30-39.99
34.0
$28,791
$31,272
$36,236
$41,199
$46,163
$51,126
$58,572
$63,535
$66,017
$78,426
$90,834
$100,761
Virginia
40-59.99
46.0
$29,807
$32,967
$39,287
$45,607
$51,927
$58,247
$67,727
$74,047
$77,207
$93,008
$108,808
$121,448
Virginia
60-79.99
69.0
$43,808
$48,308
$57,308
$66,308
$75,308
$84,308
$97,808
$106,808
$111,308
$133,808
$156,308
$174,308
Virginia
80-99.99
85.1
$44,721
$49,809
$59,985
$70,161
$80,337
$90,513
$105,777
$115,953
$121,041
$146,481
$171,921
$192,273
Virginia
100 <
145.0
$72,048
$80,063
$96,095
$112,126
$128,158
$144,189
$168,236
$184,268
$192,283
$232,362
$272,440
$304,503
Washington
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Washington
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Washington
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Washington
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Washington
10-14.99
12.0
$12,543
$13,666
$15,912
$18,158
$20,404
$22,650
$26,019
$28,265
$29,388
$35,003
$40,617
$45,109
Washington
15-19.99
17.0
$14,866
$16,149
$18,714
$21,279
$23,844
$26,409
$30,257
$32,822
$34,104
$40,517
$46,930
$52,060
Washington
20-29.99
23.0
$24,058
$26,032
$29,980
$33,928
$37,876
$41,824
$47,746
$51,694
$53,668
$63,538
$73,409
$81,305
Washington
30-39.99
34.0
$28,634
$30,959
$35,609
$40,259
$44,910
$49,560
$56,535
$61,185
$63,510
$75,136
$86,761
$96,062
Washington
40-59.99
46.0
$29,595
$32,543
$38,439
$44,336
$50,232
$56,128
$64,972
$70,868
$73,816
$88,557
$103,297
$115,089
Washington
60-79.99
69.0
$43,490
$47,672
$56,036
$64,400
$72,765
$81,129
$93,675
$102,039
$106,221
$127,132
$148,042
$164,771
Washington
80-99.99
85.1
$44,328
$49,024
$58,416
$67,808
$77,200
$86,592
$100,679
$110,071
$114,767
$138,247
$161,726
$180,510
Washington
100 <
145.0
$71,380
$78,727
$93,422
$108,118
$122,813
$137,508
$159,551
$174,246
$181,594
$218,332
$255,070
$284,460
West Virginia
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
West Virginia
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
West Virginia
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
West Virginia
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
1-287

-------
Appendix I: Model Project Costs
State
Size
(acres)
Median
size
OPTION 4 - TRANSPORTATION
Duration (days)
0-46
47-91
92-182
183-274
275-365
366-456
457-547
548-639
640-730
731-912
913-1,095
1,096 <
West Virginia
10-14.99
12.0
$12,625
$13,830
$16,241
$18,651
$21,061
$23,471
$27,086
$29,497
$30,702
$36,727
$42,753
$47,573
West Virginia
15-19.99
17.0
$14,983
$16,381
$19,179
$21,977
$24,775
$27,573
$31,769
$34,567
$35,966
$42,961
$49,955
$55,551
West Virginia
20-29.99
23.0
$24,215
$26,347
$30,609
$34,872
$39,135
$43,398
$49,793
$54,055
$56,187
$66,844
$77,501
$86,027
West Virginia
30-39.99
34.0
$28,867
$31,424
$36,540
$41,656
$46,771
$51,887
$59,560
$64,676
$67,234
$80,023
$92,812
$103,043
West Virginia
40-59.99
46.0
$29,910
$33,173
$39,699
$46,225
$52,750
$59,276
$69,065
$75,591
$78,854
$95,168
$111,483
$124,534
West Virginia
60-79.99
69.0
$43,962
$48,616
$57,925
$67,234
$76,543
$85,851
$99,814
$109,123
$113,777
$137,049
$160,321
$178,938
West Virginia
80-99.99
85.1
$44,911
$50,189
$60,746
$71,303
$81,859
$92,416
$108,251
$118,808
$124,086
$150,478
$176,870
$197,983
West Virginia
100 <
145.0
$72,372
$80,712
$97,392
$114,072
$130,752
$147,432
$172,452
$189,132
$197,472
$239,172
$280,872
$314,232
Wisconsin
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wisconsin
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wisconsin
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wisconsin
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wisconsin
10-14.99
12.0
$12,502
$13,584
$15,747
$17,911
$20,075
$22,238
$25,484
$27,647
$28,729
$34,138
$39,547
$43,874
Wisconsin
15-19.99
17.0
$14,808
$16,032
$18,481
$20,929
$23,378
$25,826
$29,499
$31,947
$33,171
$39,292
$45,414
$50,310
Wisconsin
20-29.99
23.0
$23,979
$25,874
$29,664
$33,454
$37,245
$41,035
$46,720
$50,511
$52,406
$61,881
$71,357
$78,938
Wisconsin
30-39.99
34.0
$28,517
$30,726
$35,143
$39,560
$43,977
$48,393
$55,019
$59,436
$61,644
$72,686
$83,729
$92,562
Wisconsin
40-59.99
46.0
$29,437
$32,228
$37,808
$43,389
$48,969
$54,550
$62,921
$68,501
$71,291
$85,243
$99,194
$110,355
Wisconsin
60-79.99
69.0
$43,253
$47,199
$55,089
$62,980
$70,871
$78,762
$90,598
$98,489
$102,434
$122,161
$141,888
$157,669
Wisconsin
80-99.99
85.1
$44,036
$48,440
$57,248
$66,056
$74,864
$83,672
$96,884
$105,692
$110,096
$132,116
$154,136
$171,752
Wisconsin
100 <
145.0
$70,882
$77,732
$91,433
$105,133
$118,833
$132,534
$153,084
$166,785
$173,635
$207,886
$242,136
$269,537
Wyoming
1-2.99
1.9
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
$490
Wyoming
3-4.99
3.8
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
$692
Wyoming
5-7.49
6.0
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
$869
Wyoming
7.5-9.99
8.5
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
$1,034
Wyoming
10-14.99
12.0
$12,320
$13,220
$15,020
$16,820
$18,620
$20,420
$23,121
$24,921
$25,821
$30,321
$34,821
$38,421
Wyoming
15-19.99
17.0
$12,621
$13,588
$15,522
$17,455
$19,388
$21,322
$24,222
$26,156
$27,122
$31,956
$36,789
$40,656
Wyoming
20-29.99
23.0
$23,630
$25,177
$28,271
$31,364
$34,458
$37,551
$42,191
$45,285
$46,832
$54,565
$62,299
$68,486
Wyoming
30-39.99
34.0
$24,144
$25,838
$29,225
$32,612
$35,998
$39,385
$44,466
$47,853
$49,546
$58,013
$66,480
$73,254
Wyoming
40-59.99
46.0
$28,741
$30,834
$35,021
$39,208
$43,395
$47,582
$53,863
$58,049
$60,143
$70,610
$81,078
$89,452
Wyoming
60-79.99
69.0
$42,208
$45,108
$50,909
$56,709
$62,510
$68,310
$77,011
$82,811
$85,711
$100,213
$114,714
$126,315
Wyoming
80-99.99
85.1
$42,747
$45,862
$52,092
$58,322
$64,552
$70,782
$80,127
$86,357
$89,472
$105,046
$120,621
$133,081
Wyoming
100 <
145.0
$68,686
$73,340
$82,647
$91,955
$101,263
$110,570
$124,532
$133,839
$138,493
$161,762
$185,031
$203,646
1-288

-------