Industrial SPPI Partner Teaming Profile
Service/Product Provider
Paulus, Sokolowski & Sartor (PS&S)
67B Mountain Blvd. Ext.,
Warren, NJ 07059
Business: Architects & Engineers
Mike Belikoff, Senior Vice President
Phone: 732-584-0449
Email: mbelikoff@psands.com
Industrial Partner
Johnson & Johnson (J&J)
One Johnson & Johnson Plaza
New Brunswick, NJ 08933
Business: Pharmaceutical Products
Dennis Canavan, Executive Director
Phone: 732-524-6269
Email: dcanavan2@corus.jnj.com
PS&S conducts a Cogeneration Feasibility Study to help Johnson & Johnson improve
their facilities' power reliability, reduce energy costs, and control greenhouse gas
emissions.
Project Scope:
This project was part of the design and engineering of a new facility at Johnson & Johnson's existing
Gurabo, Puerto Rico site. For this new site, PS&S investigated the feasibility of incorporating
cogeneration to reduce purchased energy and energy intensity.
Project Summary
PS&S considered diesel and gas turbine generators of 1 to 2 MW capacity to determine the economic
viability and the greenhouse gas reduction potential of cogeneration. This consideration included
analyses of local electric tariff structures and existing facility electric/steam loads. By using lifecycle cost
analysis for each alternative, a design was selected that utilized two 1.6 MW diesel generators with both
exhaust and jacket water heat recovery systems. The cogeneration plant will run parallel with the grid for
reliability, supplemental power, and standby power during utility outages.
•	Energy Savings
229,000 gallons per year of fuel oil equivalent to $275,000 per year
•	Investment
$5.9 million initial capital investment partially offset by a cost avoidance of $1.5 million for standby
generator replacement
•	Financial Return
The 20-year lifecycle cost analysis produced an after tax internal rate of return (IRR) of 12.9%
•	Other Benefits
Increased reliability of energy supply and reduced carbon emissions
Monitoring & Verifying Energy Savings
PS&S used actual utility bills and fuel delivery receipts in the energy and cost calculations. Savings will
be verified upon project completion.
Distinguishing Value
PS&S helped Johnson & Johnson to save 3500 tons/year of C02 to support Johnson & Johnson's
commitment to reduce greenhouse gas emissions.