Stormwater Phase II Final Rule
oEPA
September 2018
brine
Pollution Prevention/Good Housekeeping
Minimum Control Measure
This fact sheet profiles the Pollution Prevention/Good Housekeeping
for Municipal Operations minimum control measure, one of six
measures the operator of a Phase II regulated small municipal
separate storm sewer system (MS4) is required to include n ts storm
water management program to meet the conditions of its National
Pollutant Discharge Elimination System (NPDES) permit. This fact sheet
outlines the Phase II Final Rule requirements modified December 9,
2016 and effective on January 9, 2017. It offers some general guidance
on how to satisfy them. It is important to keep in mind that the small
MS4 operator typically has a great deal of flexibility in choosing exactly
how to satisfy the minimum control measure requirements in its NPDES
permit.
United States
Environmental Protection Agency
Office of Water
(4203)
Factsheet 2.8




-------