United States Environmental Protection Agency
General Permit for New or Modified Minor Sources of Air
Pollution in Indian Country
http://www.epa.gov/air/tribal/tribalnsr.html
General Air Quality for New or Modified True Minor Source Gasoline
Dispensing Facilities in Indian Country
Information about this General Permit:
Applicability
Pursuant to the provisions of the Clean Air Act (CAA), Subchapter I, part D and 40 CFR part 49, subpart C, this
permit authorizes the construction or modification and the operation of each stationary gasoline dispensing
facility (GDF) for which a reviewing authority issues an Approval of the Request for Coverage (permitted source).
Eligibility
To be eligible for coverage under this general permit, the permitted source must qualify as a true minor source
as defined in 40 CFR 49.152.
Request for Coverage
Requirements for submitting a Request for Coverage are contained in Section 7 of this general permit.
Incorporation of Documents
The information contained in each reviewing authority's Approval of the Request of Coverage is hereby
incorporated into this general permit.
Termination
Section 6 of this general permit addresses a reviewing authority's ability to revise, revoke and reissue, or
terminate this general permit. It also addresses the reviewing authority's ability to terminate an individual
permitted source's Approval of the Request for Coverage under this general permit.
Definitions
The terms used herein shall have the meaning as defined in 40 CFR 49.152, unless otherwise defined in
Attachment B of this permit. If a term is not defined, it shall be interpreted in accordance with normal business
use.
$
<
33
V
o
w
PRO^t&
III
0

-------
Permit Terms and Conditions
The following applies to each permittee and permitted source with respect to only the affected emissions units
and any associated air pollution control technologies in that permitted source's Approval of the Request for
Coverage.
Section 1: General Provisions
1.	Construction and Operation
The permittee shall construct or modify and shall operate the affected emissions units and any associated
air pollution control technologies in compliance with this permit and all other applicable federal air quality
regulations; and in a manner consistent with representations made by the permittee in the Request for
Coverage, to the extent the reviewing authority relies upon these representations in issuing the Approval of
the Request for Coverage.
2.	Locations
This permit only authorizes the permittee to construct or modify and to operate the permitted source in the
location(s) listed in the reviewing authority's Approval of the Request for Coverage for that permitted
source.
3.	Liability
This permit does not release the permittee from any liability for compliance with other applicable federal
and tribal environmental laws and regulations, including the CAA.
4.	Severability
The provisions of this permit are severable. If any portion of this permit is held invalid, the remaining
terms and conditions of this permit shall remain valid and in force.
5.	Compliance
The permittee must comply with all provisions of this permit, including emission limitations that apply to the
affected emissions units at the permitted source. Noncompliance with any permit provision is a violation of
the permit and may constitute a violation of CAA; is grounds for an enforcement action; and is grounds for
the reviewing authority to revoke the Approval of the Request for Coverage and terminate the permitted
source's coverage under this general permit.
6.	National Ambient Air Quality Standards (NAAQS)/Prevention of Significant Deterioration (PSD) Protection
The permitted source must not cause or contribute to a NAAQS violation or, in an attainment area, must not
cause or contribute to a PSD increment violation.
7.	Unavailable Defense
It is not a defense for the permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the provisions of this permit.
8.	Property Rights
The permit does not convey any property rights of any sort or any exclusive privilege.
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 2 of 14

-------
9.	Information Requests
You, as the permittee, shall furnish to the reviewing authority, within a reasonable time, any information
that the reviewing authority may request in writing to determine whether cause exists for revising, revoking
and reissuing, or terminating the permit or to determine compliance with the permit. For any such
information claimed to be confidential, the permittee must submit a claim of confidentiality in accordance
with 40 CFR part 2 subpart B.
10.	Inspection and Entry
Upon presentation of proper credentials, the permittee must allow a representative of the reviewing
authority to:
a.	Enter upon the premises where a permitted source is located or emissions-related activity is conducted
or where records are required to be kept under the conditions of the permit;
b.	Have access to and copy, at reasonable times, any records that are required to be kept under the
conditions of the permit;
c.	Inspect, during normal business hours or while the permitted source is in operation, any facilities,
equipment (including monitoring and air pollution control equipment), practices or operations regulated
or required under the permit;
d.	Sample or monitor, at reasonable times, substances or parameters for the purpose of assuring
compliance with the permit or other applicable requirements and
e.	Record any inspection by use of written, electronic, magnetic and photographic media.
11.	Posting of Coverage
This general permit, and the most current Approval of the Request for Coverage for the permitted
source, must be posted prominently at the facility, and each affected emissions unit and any associated
air pollution control technology must be labeled with the identification number listed in the Approval of
the Request for Coverage for that permitted source.
12.	Duty to Obtain Source-specific Permit
If the reviewing authority intends to terminate a permitted source's coverage under this general permit for
cause as provided in Section 6 of this general permit, then the permittee shall apply for and obtain a source-
specific as required by the reviewing authority.
13.	Credible Evidence
For the purpose of establishing whether the permittee violated or is in violation of any requirement of this
permit, nothing shall preclude the use, including the exclusive use, of any credible evidence or information
relevant to whether a permitted source would have been in compliance with applicable requirements if the
permittee had performed the appropriate performance or compliance test or procedure.
Section 2: Emission Limitations and Standards
14.	The permittee shall maintain and operate each affected emissions unit, including any associated air
pollution control equipment, in a manner consistent with good air pollution control practices for
minimizing emissions of New Source Review regulated pollutants and considering the manufacturer's
recommended operating procedures at all times, including periods of startup, shutdown,
maintenance and malfunction. The reviewing authority will determine whether the permittee is using
acceptable operating and maintenance procedures based on information available to the reviewing
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 3 of 14

-------
authority which may include, but is not limited to, monitoring results, opacity observations, review of
operating and maintenance procedures, and inspection of the permitted source.
15.	You must ensure gasoline is handled in a manner that will minimize vapor releases to the
atmosphere. The measures to be taken include:
a.	Minimizing gasoline spills;
b.	Cleaning up spills as expeditiously as practicable;
c.	Covering all open gasoline containers and all gasoline storage tank fill-pipes with a gasketed seal
when not in use (all portable gasoline containers that meet the requirements of 40 CFR part 59,
subpart F meet this requirement);
d.	Minimizing gasoline sent to open waste collection systems that collect and transport gasoline to
reclamation and recycling devices, such as oil/water separators; and
e.	To the extent practicable, any other actions necessary to minimize vapor releases to the
atmosphere.
16.	Except as specified in condition 16.b, you must only load gasoline into storage tanks at your facility by
utilizing submerged filling, and as specified in this condition. The applicable distances shall be measured
from the point in the opening of the submerged fill pipe that is the greatest distance from the bottom of the
storage tank.
a.	Submerged fill pipes must be no more than 6 inches from the bottom of the tank.
b.	Submerged fill pipes not meeting the specifications of condition 16.a are allowed if the owner or
operator can demonstrate that the liquid level in the tank is always above the entire opening of the fill
pipe. Documentation providing such demonstration must be made available onsite for inspection by the
reviewing authority.
17.	Each new or modified gasoline storage tank constructed must be equipped with a Stage I dual-point vapor
balance system.
18.	Except as provided in condition 19, each Stage I dual-point vapor balance system on your gasoline storage
tank must meet the design criteria and management practices in Attachment C, as applicable.
19.	The affected emissions units listed below are not required to comply with the control requirements in
conditions 17 and 18, but must comply with the requirements in condition 16.
a.	Gasoline storage tanks with a capacity of less than 250 gallons that are constructed after January 10,
2008.
b.	Gasoline storage tanks with a capacity of less than 2,000 gallons that were constructed before January
10, 2008.
c.	Gasoline storage tanks equipped with floating roofs, or the equivalent.
20.	Cargo tanks unloading at GDFs must not unload gasoline into a storage tank at a GDF unless the following
management practices are met:
a.	All hoses in the vapor balance system are properly connected;
b.	The adapters or couplers that attach to the vapor line on the storage tank have closures that seal upon
disconnect;
c.	All vapor return hoses, couplers, and adapters used in the gasoline delivery are vapor-tight;
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 4 of 14

-------
d.	All tank truck vapor return equipment is compatible in size and forms a vapor-tight connection with the
vapor balance equipment on the GDF storage tank; and
e.	All hatches on the tank truck are closed and securely fastened.
f.	The filling of storage tanks at GDF shall be limited to unloading from vapor-tight gasoline cargo tanks.
21.	GDFs located in a serious, severe or extreme ozone nonattainment area shall limit throughput of
gasoline to less than 8,000,000 gallons per year based on a 12-month rolling total.
22.	Each emergency engine shall:
a.	Be equipped with a non-resettable hour meter;
b.	If using fuel oil, use diesel or biodiesel containing no more than 15 ppm (0.0015 percent) sulfur;
c.	Meet the following certification requirements for compression ignition emergency engines:
i. For model year 2006 and later engines, the engine shall be certified to the standards in 40
CFR part 89.
d.	Meet the following certification requirements for spark ignition emergency engines
manufactured on or after January 1, 2009:
i.	Engines greater than 50 hp and less than 130 hp shall be certified to the Phase I standards
in 40 CFR 90.103;
ii.	Engines greater than or equal to 130 hp shall be certified to the standards in 40 CFR 1048.
e.	If not required to be certified to the standards in Conditions 22.c or d:
i.	Follow the manufacturer's emission-related operation and maintenance instructions or
develop your own maintenance plan which must provide to the extent practicable for the
maintenance and operation of the engine in a manner consistent with good air pollution
control practice for minimizing emissions;
ii.	Change oil and filter and inspect every hose and belt every 500 hours of operation or
annually, whichever comes first; and
iii.	Inspect air cleaner or spark plugs, as applicable, every 1,000 hours of operation, or
annually, whichever comes first.
Section 3: Monitoring and Testing Requirements
23.	For each vapor balance system the permittee shall perform an initial performance test as prescribed in
Attachment C. The performance test shall be conducted within 60 days after achieving the maximum
production rate at which the permitted source will operate the affected vapor balance system, but not later
than 180 days after the first day of operation after the reviewing authority issues the Approval of the
Request for Coverage.
24.	For a GDF that must meet the throughput limit in condition 21, the permittee shall monitor monthly
gasoline throughput in gallons.
25.	The permittee shall weekly inspect the vapor control recovery system(s), all pumps, compressors, pipes,
hoses, mechanical seals, or other equipment storing, handling, conveying, or controlling volatile organic
compounds (VOCs). The inspections shall be used to determine whether all equipment is in good working
order according to any available manufacturer's recommendations and good engineering practices.
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 5 of 14

-------
Section 4: Recordkeeping Requirements
26.	The permittee shall maintain all records required to be kept onsite by this permit for at least five years from
the date of origin, unless otherwise stated.
27.	The permit application and all documentation supporting that application shall be maintained by the
permittee for the duration of time the affected emissions unit(s) is covered under this permit.
28.	The permittee shall maintain records of each inspection required by condition 25. The records shall include a
log of:
a.	Identification of the devices inspected;
b.	The date of the inspection;
c.	The results of each inspection;
d.	Any corrective actions taken as a result of the inspection; and
e.	The results of any corrective actions taken.
29.	For each emergency engine, the permittee shall maintain a log of all maintenance actives conducted and a
log of the hours of operation including the date, time, duration, and reason for use.
30.	A GDF subject to the throughput limit in condition 21 shall maintain records on a monthly basis of the fuel
throughput and the 12-month rolling total. The 12-month rolling total is defined as the sum of the fuel
throughput during the current month and the fuel throughput for the previous eleven (11) months.
31.	The results of each performance test conducted pursuant to Condition 23 shall be recorded. At a minimum,
the permittee shall maintain records of:
a.	The date of each test;
b.	Each test plan;
c.	Any documentation required to approve an alternate test method;
d.	Test conditions;
e.	The results of each test; and
f.	The name of the company or entity conducting the analysis.
Section 5: Notification and Reporting Requirements
32.	Notification of construction or modification, and operations
The permittee shall submit a written or electronic notice to the reviewing authority within 30 days from
when the permittee begins actual construction, and when the permittee begins operations or resumes
operation.
33.	Notification of Change in Ownership
If the permitted source changes ownership, then the permittee must submit a written or electronic notice to
the reviewing authority within 90 days before or after the change in ownership is effective. In the report, the
permittee must provide the reviewing authority a written agreement containing a specific date for transfer
of ownership, and an effective date on which the new owner assumes partial and/or full coverage and
liability under this permit. The submittal must identify the previous owner, and update the name, street
address, mailing address, contact information, and any other information about the permitted source if it
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 6 of 14

-------
would change as a result of the change of ownership. The permittee shall ensure that the permitted source
remains in compliance with the general permit during any such transfer of ownership.
34.	Notification of Closure
The permittee must submit a report of any permanent or indefinite closure to the reviewing authority in
writing within 90 days after the cessation of all operations at the permitted source. The notification must
identify the owner, the current location, and the last operating location of the permitted source. It is not
necessary to submit a report of closure for regular, seasonal closures.
35.	Annual Reports
The permittee shall submit an annual report on or before March 15 of each calendar year to the reviewing
authority. The annual report shall cover the period from January 1 to December 31 of the previous calendar
year and shall include:
a.	An evaluation of the permitted source's compliance status with the emission limitations and standards
in Section 2 for each location in which the permitted source located during the calendar year;
b.	Summaries of the required monitoring and recordkeeping in Sections 3 and 4; and
c.	Summaries of deviation reports submitted pursuant to Condition 36.
36.	Deviation Reports
The permittee shall promptly report to the reviewing authority any deviations from permit requirements
including deviations attributable to upset conditions. Deviation reports shall include:
a.	The identity of affected emissions unit where the deviation occurred.
b.	The nature of the deviation;
c.	The length of time of the deviation;
d.	The probable cause of the deviation; and
e.	Any corrective actions or preventive measures taken as a result of the deviation to minimize emissions
from the deviation and to prevent future deviations.
f.	For the purposes of this permit, promptly shall be defined to mean:
i. At the time the annual report in Condition 35 is submitted.
37.	Performance Test Reports
The permittee shall submit a test report to the reviewing authority within 45 days after the completion of
any required performance test. At a minimum, the test report shall include:
a.	A description of the affected emissions unit and sampling location(s);
b.	The time and date of each test;
c.	A summary of test results, reported in units consistent with the applicable standard;
d.	A description of the test methods and quality assurance procedures used;
e.	A summary of any deviations from the proposed test plan and justification for why the deviation(s) was
necessary;
f.	The amount of fuel burned, raw material consumed, and product produced during each test run;
g.	Operating parameters of the affected emissions unit and control equipment during each test run; and
h.	Sample calculations of equations used to determine test results in the appropriate units.
i.	The name of the company or entity performing the analysis.
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 7 of 14

-------
38.	Reporting and Notification Address
The permittee shall send all required reports to the reviewing authority at the mailing address(es) specified
in the Approval of the Request for Coverage.
39.	Signature Verifying Truth, Accuracy, and Completeness
All reports required by this permit shall be signed by a responsible official as to the truth, accuracy, and
completeness of the information. The report must state that, based on information and belief formed after
reasonable inquiry, the statements and information are true, accurate, and complete. If the permittee
discovers that any reports or notification submitted to the reviewing authority contain false, inaccurate, or
incomplete information, the permittee shall notify the reviewing authority immediately and correct or
amend the report as soon as practicable.
Section 6: Changes to this General Permit
40.	Revising, Reopening, Revoking and Reissuing, or Terminating for Cause
The permit may be revised, reopened, revoked and reissued, or terminated for cause. The filing of a request
by you, the permittee, for a permit revision, revocation and re-issuance, or termination, or of a notification
of planned changes or anticipated noncompliance does not stay any permit condition. This provision also
applies to the documents incorporated by reference.
41.	Terminating Coverage under this Permit
The reviewing authority may terminate a previously issued Approval of the Request for Coverage, and
thereby terminate that permittee's authorization to construct or modify, and that permitted source's
authorization to operate under this general permit for cause as defined in Attachment B. The reviewing
authority may provide the permittee with notice of the intent to terminate, and delay the effective date of
the termination to allow the permittee to obtain a source specific permit as required by the reviewing
authority.
42.	Change in ownership
If the permitted source changes ownership, the reviewing authority may change the Approval of the
Request of Coverage to reflect the new ownership in accordance with the administrative amendment
provisions in 40 CFR 49.159(f).
Section 7: Obtaining Coverage under this General Permit
43.	To obtain coverage under this general permit, an applicant must submit a Request for Coverage to the
appropriate reviewing authority for the area in which the permitted source is or will be located. Attachment
D contains a list of reviewing authorities and their area of coverage. You must also submit a copy of the
Request for Coverage to the Indian governing body for any area in which the permitted source will operate.
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 8 of 14

-------
Attachment A: Abbreviations and Acronyms
AST	aboveground storage tank
CAAortheAct Federal Clean Air Act
CFR	Code of Federal Regulations
EPA	United States Environmental Protection Agency
GDF	Gasoline Dispensing Facility
NAAQS	National Ambient Air Quality Standards
NSR	New Source Review
ppm	parts per million
PSD	Prevention of Significant Deterioration
PV	pressure/vacuum
VOC	volatile organic compounds
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 9 of 14

-------
Attachment B: Definitions
For the purposes of this general permit:
Approval of the Request for Coverage means a reviewing authority's letter granting an applicant's request for
construction or modification, and operation of a true minor source under the terms and conditions of this
general permit.
Cause means with respect to the reviewing authority's ability to terminate a permitted source's coverage under
a permit that:
(1)	The permittee is not in compliance with the provisions of this general permit;
(2)	The reviewing authority determines that the emissions resulting from the construction or modification
of the permitted source significantly contribute to NAAQS violations, which are not adequately
addressed by the requirements in this general permit;
(3)	The reviewing authority has reasonable cause to believe that the permittee obtained Approval of the
Request for Coverage by fraud or misrepresentation; or
(4)	The permittee failed to disclose a material fact required by the Request for Coverage or the regulations
applicable to the permitted source of which the applicant had or should have had knowledge at the time
the permittee submitted the Request for Coverage.
Construction means any physical change or change in the method of operation including fabrication, erection,
installation, demolition, or modification of an affected emissions unit that would result in a change of emissions.
Dual-point vapor balance system means a type of vapor balance system in which the storage tank is equipped
with an entry port for a gasoline fill pipe and a separate exit port for a vapor connection.
Emergency engine means any stationary reciprocating internal combustion engine that meets all of the criteria
in paragraphs (1) through (3) of this definition. All emergency engines must comply with the requirements
specified in 40 CFR 63.6640(f) in order to be considered emergency engines. If the engine does not comply with
the requirements specified, then it is not considered to be an emergency engine.
(1)	The engine is operated to provide electrical power or mechanical work during an emergency situation.
Examples include engines used to produce power for critical networks or equipment (including power
supplied to portions of a facility) when electric power from the local utility (or the normal power
source, if the facility runs on its own power production) is interrupted, or an engine used to pump
water in the case of fire or flood, etc.
(2)	The engine is operated under limited circumstances for situations not included in paragraph (1) of this
definition, as specified in 40 CFR 63.6640(f).
(3)	The engine operates as part of a financial arrangement with another entity in situations not included in
paragraph (1) of this definition only as allowed in 40 CFR 63.6640(f).
Permittee means the owner or operator of a permitted source.
Permitted source means each gasoline dispensing facility for which a reviewing authority issues an Approval for
Request for Coverage.
Request for Coverage means a permit application that contains all the information required in the standard
application form.
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 10 of 14

-------
Submerged filling means the filling of a gasoline storage tank through a submerged fill pipe whose discharge is
no more than 6 inches from the bottom of the tank. Bottom filling of gasoline storage tanks is included in this
definition.
Ullage means the amount of liquid lost from a gasoline storage tank during storage.
Vapor balance system means a combination of pipes and hoses that create a closed system between the vapor
spaces of an unloading gasoline cargo tank and a receiving storage tank such that vapors displaced from the
storage tank are transferred to the gasoline cargo tank being unloaded.
Vapor tight means equipment that allows no loss of vapors. Compliance with vapor-tight requirements can be
determined by checking to ensure that the concentration at a potential leak source is not equal to or greater
than 100 percent of the Lower Explosive Limit when measured with a combustible gas detector, calibrated with
propane, at a distance of 1 inch from the potential leak source.
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 11 of 14

-------
Attachment C: Vapor Balance System Design Criteria, Management Practices, and
Performance Testing
Design criteria and management practices for each vapor balance system:
1.	All vapor connections and lines on the storage tank(s) shall be equipped with closures that seal upon
disconnect.
2.	The vapor line from the gasoline storage tank to the gasoline cargo tank shall be vapor-tight.
3.	The vapor balance system shall be designed such that the pressure in the tank truck does not exceed 18
inches water pressure or 5.9 inches water vacuum during product transfer.
4.	The vapor recovery and product adaptors, and the method of connection with the delivery elbow, shall be
designed so as to prevent the over-tightening or loosening of fittings during normal delivery operations.
5.	If a gauge well separate from the fill tube is used, it shall be provided with a submerged drop tube that
extends no more than 6 inches from the bottom of the storage tank.
6.	Liquid fill connections for all systems shall be equipped with vapor-tight caps.
7.	Pressure/vacuum (PV) vent valves shall be installed on the storage tank vent pipes. The pressure
specifications for PV vent valves shall be: a positive pressure setting of 2.5 to 6.0 inches of water and a
negative pressure setting of 6.0 to 10.0 inches of water. The total leak rate of all PV vent valves at an
affected facility, including connections, shall not exceed 0.17 cubic foot per hour at a pressure of 2.0 inches
of water and 0.63 cubic foot per hour at a vacuum of 4 inches of water.
8.	The vapor balance system shall be capable of meeting the static pressure performance requirement of the
following equation: Pf = 2e~500887/v', where: Pf = Minimum allowable final pressure, inches of water, v = total
ullage affected by the test, gallons, e = dimensionless constant equal to approximately 2.718, 2 = the initial
pressure, inches water.
9.	For aboveground storage tanks (ASTs) with a capacity greater than 250 gallons and located at a GDF in a
serious, severe, or extreme ozone nonattainment area the permittee shall also:
a.	Limit standing loss emissions to less than or equal to 0.57 lbs VOC per 1,000 gallons ullage per day
(lbs/1,000 gallons/day), for newly installed tanks.
b.	Limit standing loss emissions to less than or equal to 2.26 lbs VOC per 1,000 gallons ullage per day
(lbs/1,000 gallons/day), for modified or reconstructed tanks.
Vapor balance system performance testing:
10.	The permittee shall conduct performance testing to demonstrate compliance with the leak rate and cracking
pressure requirements, specified Attachment C, condition 7, for pressure-vacuum vent valves installed on
your gasoline storage tanks as follows:
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 12 of 14

-------
a.	According to test plan approved by the reviewing authority;
b.	While the permitted source is operating under typical operating conditions; and
c.	Using California Air Resources Board Vapor Recovery Test Procedure TP-201.1E,—Leak Rate and
Cracking Pressure of Pressure/Vacuum Vent Valves, adopted October 8, 2003 (see 40 CFR 63.14).
11.	The permittee shall conduct performance testing to demonstrate compliance with the static pressure
performance requirement, specified in Attachment C, condition 8, for each vapor balance system by
conducting a static pressure test on each gasoline storage tank as follow:
a.	According to a test plan approved by the reviewing authority;
b.	While the permitted source is operating under typical operating conditions;
c.	Using California Air Resources Board Vapor Recovery Test Procedure TP-201.3,—Determination of 2-Inch
WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities, adopted April 12,
1996, and amended March 17, 1999 (see 40 CFR 63.14); and
d.	Using Bay Area Air Quality Management District Source Test Procedure ST-30—Static Pressure Integrity
Test—Underground Storage Tanks, adopted November 30, 1983, and amended December 21, 1994 (see
40 CFR 63.14).
12.	For ASTs subject to Condition 9 of Attachment C, the permittee shall conduct performance testing to
demonstrate compliance with the standing loss emission limits as follows:
a.	According to a test plan approved by the reviewing authority;
b.	While the permitted source is operating under typical operating conditions; and
c.	Using California Air Resources Board Vapor Recovery Test Procedure TP-206.1 or TP-206.2 to determine
standing loss emissions.
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 13 of 14

-------
Attachment D - List of Reviewing Authorities and Areas of Coverage
EPA Region
Address
Area Covered
Phone Number
Region 1
1 Congress Street
Suite 1100
Boston, MA 02114-2023
Connecticut, Maine, Massachusetts,
New Hampshire, Rhode Island, and
Vermont
888- 372-7341
617-918-1111
Region II
290 Broadway
25th Floor
New York, NY 10007-1866
New Jersey, New York, Puerto Rico,
and Virgin Islands
877-251-4575
Region III
1650 Arch Street
Philadelphia, PA 19103-2187
Delaware, District of Columbia,
Maryland, Pennsylvania, Virginia,
and West Virginia
800-438-2474
215-814-5000
Region IV
Sam Nunn Atlanta Federal Center
61 Forsyth Street SW
12th Floor
Atlanta, GA 30303
Alabama, Florida, Georgia, Kentucky,
Mississippi, North Carolina, South
Carolina, and Tennessee
800-241-1754
404-562-9000
Region V
77 West Jackson Street
Chicago, IL 60604
Illinois, Indiana, Michigan,
Minnesota, Ohio, and Wisconsin
800-621-8431
312-353-2000
Region VI
1445 Ross Avenue
Dallas, TX 75202
Arkansas, Louisiana, New Mexico,
Oklahoma, and Texas
800-887-6063
214-665-2760
Region VII
11201 Renner Boulevard
Lenexa, KS 66219
Iowa, Kansas, Missouri, and
Nebraska
800-223-0425
913-551-7003
Region VIII
1595 Wynkoop Street
Denver, CO 80202-1129
Colorado, Montana, North Dakota,
South Dakota, Utah, and Wyoming
800-227-8917
303-312-6312
Region IX
75 Hawthorne Street
San Francisco, CA 94105
American Samoa, Arizona,
California, Guam, Hawaii, Nevada,
and Northern Mariana Islands
866-EPA-9378
415-947-8000
Region X
1200 Sixth Avenue
Seattle, WA 98101
Alaska, Idaho, Oregon, and
Washington
800-424-4372
206-553-1200
General Permit for Gasoline Dispensing Facilities
Version 1.0
Page 14 of 14

-------