ORGANOPHOSPHORUS PESTICIDES
SW-8 4 6 Method 8141A
Table 1A. Summary of Holding Times and Preservation for Organophosphorus
Pesticides
Analytical
Parameter a
Technical and
Contract Holding
Times
Preservation
Organophosphorus
Technical for
Cool to 4°C ±2°C;
Pesticides in
Extraction: 7 davs

Water
from collection;


Contract for


Extraction: 5 davs


from receipt at


laboratory


Technical and


Contract for


Analysis: 40 davs


from extraction

Organophosphorus
Pesticides in
Soil
Technical for
Extraction: 14 davs
from collection;
Contract for
Extraction: 10 davs
from receipt at
laboratory
Technical and
Contract for
Analvsis: 40 davs
from extraction
Cool to 4°C ±2°C;
a Target Compound List is provided in Table IB
Data Calculations and Reporting Units:
Calculate the sample results using calibration factors determined according to
Sections 7.4.2 and 7.8.1 of SW-846 Method 8000A.
Report water sample results in concentration units of micrograms per liter
(/ig/L) . Report soil sample results on a dry-weight basis in micrograms per
kilogram (/ig/kg) .
For rounding results, adhere to the following rules:
a)If	the number following those to be retained is less than 5, round down;
b)If	the number following those to be retained is greater than 5, round up; or
c)If	the number following the last digit to be retained is equal to 5, round
down if the digit is even, or round up if the digit is odd.
All records of analysis and calculations must be legible and sufficient to
recalculate all sample concentrations and QC results. Include an example
calculation in the data package.
8141CRF
1 of 4
Revision 12/03/1999

-------
TABLE IB. Target Compound. List, CAS Numbers, and Contract Required
Quantitation Limits for Organophosphorus Pesticides SW-846 Method
8141
Compound
CAS Number
CRQL
Water (jig/L)
CRQL
Soil (jig/Kg)
Azinphos methyl
86-50-0
1. 0
50 . 0
Bolstar (Sulprofos)
35400-43-2
0 . 7
35 . 0
Chlorpyrifos
2921-88-2
0 . 7
50 . 0
Coumaphos
56-72-4
2 . 0
100 . 0
Demeton, 0,S
8065-48-3
1. 2
60 . 0
Diazinon
333-41-5
2 . 0
100 . 0
Dichlorvos
62-73-7
8 . 0
400 . 0
Dimethoate
60-51-5
2 . 6
130 . 0
Disulfoton
298-04-4
0 . 7
35 . 0
EPN
2104-64-5
0 . 4
20.0
Ethoprop
13194-48-4
2 . 0
100 . 0
Fensulfothion
115-90-2
0 . 8
40 . 0
Fenthion
55-38-9
0 . 8
50 . 0
Malathion
121-75-5
1. 1
55 . 0
Merphos
150-50-5
2 . 0
100 . 0
Mevinphos
7786-34-7
5 . 0
250 . 0
Monocrotophos
6923-22-4
ND
ND
Naled
300-76-5
5 . 0
250 . 0
Parathion-ethyl
56-38-2
0 . 6
30 . 0
Parathion-methyl
298-00-0
1. 2
60 . 0
Phorate
298-02-2
0 . 4
20.0
Ronnel
299-84-3
0 . 7
35 . 0
Sulfotep
3689-24-5
0 . 7
35 . 0
TEPP
21646-99-1
8 . 0
400 . 0
Stirophos (Tetrachlorovinsphos)
22248-79-9
8 . 0
400 . 0
Tokuthion (Protothiofos)
34643-46-4
0 . 7
55 . 0
Trichloronate
327-98-0
8 . 0
400 . 0
ND - Not Determined
8141CRF
2 of 4
Revision 12/03/1999

-------
Table 2. Summary of Calibration Procedures for Organophosphorus Pesticides by SW-846 Method 8141
Calibration Element
Frequency
Acceptance
Criteria
Corrective Action
Initial Calibration
(minimum blank + 5
points for each
analyte) (ICAL) a' b,c
Initially; whenever
required, due to
failure of CCV
RSD for CFs
<20%;
1.	Terminate analysis
2.	Re-calibrate and verify before sample
analysis
Continuing Calibration
Verification (CCV) at
midpoint of ICAL
(Separate source from
ICAL standards)
Following ICV and
before sample
analysis; after
every 10 samples and
end of run
%D between CF
of CCV and
avg CFs from
ICAL <15%
1.	Re-calibrate and verify
2.	Re-analyze samples back to last good
CCV
Retention time
evaluation for CCV
standards
Each analysis of CCV
standards
±3 x the SD
of the avg
ICAL RT for
each analyte
1.	Re-calibrate and verify
2.	Re-analyze samples back to last good
CCV
a The ICAL low standard must be above but near the CRQL. The low ICAL standard must have a signal to noise
ratio >5:1. If this requirement cannot be met, the laboratory must submit a MDL study as part of the data
package.
b Report the retention time window for each analyte. Determine retention time windows as ±3 x the standard
deviation of the average initial calibration retention time for each analyte.
c ICAL and continuing CAL standards must contain all target analytes listed in Table IB.
8141CRF
3 of 4
Revision 12/03/1999

-------
Table 3. Summary of Internal Quality Control Procedures for Organophosphorus Pesticides by SW-846 Method
8141
QC Element
Frequency
Acceptance
Criteria
Corrective Action
Method Blank
(MB)
One per Batch or SDGa (1
per 2 0 samples minimum)
< CRQL for
each compound
1.	Investigate source of contamination and
document
2.	All samples processed with a method
blank that is out of control must be re-
extracted and re-analyzed
Surrogate Spike
Every standard, sample
and method blank at 10
times CRQL
Water:
75-125% of
expected value
Soil:
65-135% of
expected value
1. Re-analyze all samples with non-
compliant surrogate recoveries
Matrix Spike
and Matrix
Spike Duplicate
(MS/MSD)
One MS/MSD set per batch
or SDG (1 MS/MSD set per
2 0 samples minimum)
containing a minimum of 5
of the analytes chosen
from Table IB
65-135% of
expected
value; <30 RPD
between MS and
MSD
1. Address in Case Narrative
a SDG - Sample Delivery Group - each case of field samples received; or each 20 field samples within a case;
or each 14 calendar day period during which field samples in a case are received.
Dilute and re-analyze samples with concentrations exceeding the range of the calibration curve. Results for
such re-analyses should fall within the mid-range of the calibration curve. Report results and submit
documentation for both analyses.
Second column confirmation is required for all positive results. Confirmation must be performed on a column
of a phase different from that used for quantitation. Confirmation analyses must meet all calibration
criteria specified in Table 2 and blank acceptance criteria specified in Table 3.
8141CRF
4 of 4
Revision 12/03/1999

-------