Purpose
The purpose of this guidance manual is solely to help consecutive systems understand
and meet the requirements of the Stage 2 Disinfectants and Disinfection Byproducts Rule
(DBPR). This guidance is not a substitute for applicable legal requirements, nor is it a regulation
itself. Thus, it does not impose legally-binding requirements on any party, including EPA,
States, or the regulated community. Interested parties are free to raise questions and objections
to the guidance and the appropriateness of using it in a particular situation. The mention of trade
names or commercial products does not constitute endorsement or recommendation for use.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
Hi
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Authorship
This manual was developed under the direction of EPA's Office of Water, and was
prepared by The Cadmus Group, Inc. and Malcolm Pirnie, Inc. Questions concerning this
document should be addressed to:
Thomas Grubbs
U.S. Environmental Protection Agency
Mail Code 4607M
1200 Pennsylvania Avenue NW
Washington, DC 20460
Tel: (202) 564-5262
Fax: (202) 564-3767
Email: grubbs.thomas@epa.gov
Acknowledgements
Steve Lohman - Denver Water
James Parsons - Cobb County-Marietta Water Authority
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
iv
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
CONTENTS
Exhibits	vii
Acronyms	viii
Glossary	x
1.0 Introduction	1-1
1.1	Purpose of this Manual	1-1
1.2	Manual Organization	1-2
2.0 Overview of Existing Regulatory Requirements for Consecutive Systems	2-1
2.1	Public Notification Rule	2-1
2.2	Consumer Confidence Report (CCR) Rule	2-2
2.3	Consecutive Systems Monitoring Requirements (§ 141.29)	2-3
3.0 Stage 2 DBPR Requirements for Consecutive Systems	3-1
3.1	Disinfection Byproduct Maximum Contaminant Levels	3-1
3.2	Initi al Di stributi on Sy stem Evaluati on	3-2
3.3	Stage 2 (subpart V) Compliance Monitoring Requirements	3-4
3.3.1	Stage 2 DBPR Monitoring Plan	3-4
3.3.2	Stage 2 DBPR Compliance Monitoring	3-5
3.3.3	Reporting and Recordkeeping Requirements	3-8
3.4	Disinfectant Residual Monitoring	3-8
3.5	Operational Evaluations	3-9
3.6	Simultaneous Compliance	3-10
4.0 Compliance Options for Consecutive Systems	4-1
4.1	DBP Control in Consecutive Systems	4-1
4.2	Water Age Management	4-3
4.2.1	Pipe Looping	4-4
4.2.2	Managing Valves	4-4
4.2.3	Bypassing Oversized Pipes	4-4
4.2.4	Installing Dedicated Transmission Main	4-4
4.2.5	Improving Tank Mixing and Turnover	4-5
4.2.6	Eliminating Excess Storage and Tanks in Series	4-9
4.3	Reduction of Disinfectant Demand	4-10
4.3.1	Replacing or Cleaning and Lining Unlined Cast Iron Pipes	4-10
4.3.2	Distribution System Flushing	4-10
4.4	Chloramination	4-12
4.4.1	Water Quality Issues for Chloramines	4-12
4.4.2	Options for Chloramine Conversion	4-13
4.4.3	Cost, Handling, and Safety Issues	4-14
4.4.4	Public Education	4-15
5.0 Other Alternatives for Consecutive Systems	5-1
5.1	Improved Water Quality from the Wholesale System	5-1
5.2	Alternative Sources and Blending Strategies	5-3
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
v
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
6.0 Communication Strategies for Consecutive and Wholesale Systems	6-1
6.1	Communication Strategies for Stage 2 DBPR Compliance Monitoring	6-1
6.2	Communication Strategies for Operational Evaluations	6-4
6.3	Agreements between Consecutive and Wholesale Systems	6-5
7.0 Developing Consecutive System Compliance Strategies	7-1
7.1	Data Acquisition	7-1
7.1.1	Monitoring Parameters	7-1
7.1.2	Monitoring Frequency	7-3
7.1.3	Monitoring Locations	7-3
7.2	Communication of Needs to the Wholesale System	7-6
8.0 Frequently Asked Questions	8-1
9.0 References	9-1
Appendices
Appendix A Example of a Formal Agreement between Consecutive and Wholesale Systems
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
vi
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
EXHIBITS
Exhibit 2.1 Tiers of Public Notice	2-2
Exhibit 3.1 DBP MCLs	3-1
Exhibit 3.2 Stage 2 DBPR Compliance Schedule for Wholesale and Consecutive Systems ...3-2
Exhibit 3.3 Stage 2 (subpart V) Routine Monitoring Requirements	3-6
Exhibit 4.1 Effect of Temperature Differential Between Inflow and Tank Bulk Water on
Mixing Characteristics	4-7
Exhibit 4.2 Effect of Inlet Pipe Orientation on Mixing Characteristics	4-9
Exhibit 6.1 Coordinating Stage 2 DBPR Compliance Monitoring Schedules - Consecutive
System Receiving Water Directly from Wholesale System	6-2
Exhibit 6.2 Coordinating Stage 2 DBPR Compliance Monitoring Schedules - Consecutive
System Receiving Water Through Another Consecutive System	6-3
Exhibit 6.3 Coordinating Stage 2 DBPR Compliance Monitoring Schedules - Consecutive
System Receiving Water from Wholesale System with No Customers	6-3
Exhibit 6.4 Coordinating Stage 2 DBPR Compliance Monitoring Schedules - Approximate
Water Age of Monitoring Locations is Known	6-4
Exhibit 6.5 Case Study of Formal Agreements between Consecutive and Wholesale
Systems	6-6
Exhibit 6.6 Case Study of Informal Agreements between Consecutive and Wholesale
Systems	6-7
Exhibit 7.1 DBP Formation from Wholesale to Consecutive System	7-4
Exhibit 7.2 Variation in DBP Formation with Chlorination and Chloramination	7-5
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
vii
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
ACRONYMS
§141.2
Code of Federal Regulations, Title 40, Section 141.2
AWWA
American Water Works Association
AwwaRF
American Water Works Association Research Foundation
BATs
Best available technologies
CCR
Consumer Confidence Report
CFD
Computational fluid dynamics
CNBr
Cyanobromides
CNC1
Cyanochlorides
CNX
Cyanohalides
CT
Disinfectant residual concentration x contact time
DBP
Disinfection byproduct
DBPR
Disinfectants and Disinfection Byproducts Rule
DPD
N, N-diethyl-p-phenylenediamine
EPA
United States Environmental Protection Agency
IDSE
Initial Distribution System Evaluation
GAC
Granular activated carbon
GWUDI
Ground water under the direct influence of surface water
HAA
Haloacetic acid
HAA5
The sum of five HAA species
HPC
Heterotrophic plate count
IDSE
Initial distribution system evaluation
LCR
Lead and Copper Rule
LRAA
Locational running annual average
LT2ESWTR
Long Term 2 Enhanced Surface Water Treatment Rule
MCL
Maximum contaminant level
M-DBP
Microbial-disinfection byproducts
mg/L
Milligrams per liter
mL
Milliliter
MRDL
Maximum residual disinfectant level
N.d.
No date (for publication)
NDMA
N-nitrosodimethylamine
NPDWR
National Primary Drinking Water Regulation
NOM
Natural organic matter
NTNCWS
Nontransient noncommunity water system
PAC
Powdered activated carbon
PWS
Public water system
RAA
Running annual average
SDWA
Safe Drinking Water Act
sss
System specific study
SWTR
Surface Water Treatment Rule
TCR
Total Coliform Rule
THM
Trihalomethane
TOC
Total organic carbon
TTHM
Total trihalomethanes
UV
Ultraviolet
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
Draft for Discussion
Do not Quote. Do not Cite

-------
VSS	Very small system
WTP	Water treatment plant
October 2007 Draft Stage 2 DBPR	ix	Draft for Discussion
Consecutive Systems Guidance Manual	Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
GLOSSARY
Booster disinfection: the practice of adding disinfectant in the distribution system to maintain
disinfectant residual concentration throughout the distribution system.
Combined distribution system: the interconnected distribution system consisting of the
distribution systems of wholesale systems and of the consecutive systems that receive some or all
of their finished water from those wholesale system(s). (§141.2)
Community water system: a public water system that serves at least 15 service connections used
by year-round residents or regularly serves at least 25 year-round residents. (§141.2)
Consecutive system: a public water system that buys or otherwise receives some or all of its
finished water from one or more wholesale systems. Delivery may be through a direct
connection or through the distribution system of one or more consecutive systems. (§141.2)
Disinfectant: any oxidant, including but not limited to chlorine, chlorine dioxide, chloramines,
and ozone added to water in any part of the treatment or distribution process, that is intended to
kill or inactivate pathogenic microorganisms. (§141.2)
Disinfectant residual concentration: the concentration of disinfectant that is maintained in a
distribution system. Disinfectant could be free chlorine (the sum of the concentrations of
hypochlorous acid and hypochlorite acid or combined chlorine (chloramines). It is used in the
Surface Water Treatment Rule as a measure for determining CT.
Disinfection: a process that inactivates pathogenic organisms in water by chemical oxidants or
equival ent agents. (§141.2)
Disinfection byproduct (DBP): compound formed from the reaction of a disinfectant with
organic and inorganic compounds in the source or treated water during the disinfection process.
Finished water: water that is introduced into the distribution system of a public water system and
is intended for distribution and consumption without further treatment, except that treatment
necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition
of corrosion control chemicals). (§141.2)
Ground water under the direct influence of surface water (GWUDI): any water beneath the
surface of the ground with (1) significant occurrence of insects or other macroorganisms, algae,
or large-diameter pathogens such as Giardia lamblia, or (2) significant and relatively rapid shifts
in water characteristics such as turbidity, temperature, conductivity, or pH that closely correlate
to climatological or surface water conditions. Direct influence must be determined for individual
sources in accordance with criteria established by the State. The State determination of direct
influence may be based on site-specific measurements of water quality and/or documentation of
well construction characteristics and geology with field evaluation. (§141.2)
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
x
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Haloacetic acid (HAA) : one of the family of organic compounds named as a derivative of acetic
acid, wherein one to three hydrogen atoms in the methyl group in acetic acid are each substituted
by a halogen atom (namely, chlorine and bromine) in the molecular structure.
Haloacetic acids (five) (HAA5): the sum of the concentrations in milligrams per liter of the
haloacetic acid compounds (monochloroacetic acid, dichloroacetic acid, trichloroacetic acid,
monobromoacetic acid, and dibromoacetic acid), rounded to two significant figures after
addition. (§141.2)
Heterotrophic plate count (HPC) \ a procedure for estimating the number of heterotrophic
bacteria in water, measured as the number of colony forming units per 100 mL.
Locational running annual average (LRAA): the average of sample analytical results for
samples taken at a particular monitoring location during the previous four calendar quarters.
(§141.2)
Maximum contaminant level (MCL)\ the maximum permissable level of a contaminant in water
that is delivered to any user of a public water system. (§141.2)
Mixing zone: an area in the distribution system where water flowing from two or more different
sources blend.
Monitoring site: the location where samples are collected.
Nitrification', a two-step process in which nitrifying bacteria convert ammonia to nitrite and then
convert nitrite to nitrate. Nitrification can occur in water distribution systems in which naturally
occurring ammonia is present, or in systems that add ammonia to the water as part of the
chloramine disinfection process.
Noncommunity water system: a public water system that is not a community water system.
(§141.2)
Nontransient noncommunity water system (NTNCWS): a public water system that is not a
community water system and that regularly serves at least twenty-five of the same persons over
six months per year. (§141.2)
Public water system (PWS): a system for the provision to the public of piped water for human
consumption, if such system has at least fifteen service connections or regularly serves an
average of at least twenty-five individuals daily at least 60 days out of the year. Such term
includes (1) any collection, treatment, storage, and distribution facilities under control of the
operator of such system and used primarily in connection with such system, and (2) any
collection or pretreatment storage facilities not under such control that are used primarily in
connection with such system. A public water system is either a community water system or a
noncommunity water sy stem. (§141.2)
Residence time: the time period lasting from when the water is treated to a particular point in the
distribution system. Also referred to as water age.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
xi
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Running annual average: the average of monthly or quarterly averages of all samples taken
throughout the distribution system, as averaged over the preceding four quarters.
Secondary disinfection: The process whereby a disinfectant (typically chlorine or chloramine) is
added to finished water in order to maintain a disinfection residual in the distribution system.
Also referred to as "residual disinfection".
State: the agency of the State or Tribal government that has jurisdiction over public water
systems. During any period when a State or Tribal government does not have primary
enforcement responsibility pursuant to section 1413 of the Act, the term State means the
Regional Administrator, U.S. Environmental Protection Agency. (§141.2)
Surface water, all water that is open to the atmosphere and subject to surface runoff. (§141.2)
Total chlorine residual, the sum of combined chlorine (chloramine) and free available chlorine
residual.
Total trihalomethanes (TTHM) \ the sum of the concentration in milligrams per liter of the
trihalomethane compounds (trichloromethane [chloroform], dibromochloromethane,
bromodichloromethane, and tribromomethane [bromoform]), rounded to two significant figures.
§ 141.2 Note: Some publications may use "THM4" instead of "TTHM".
Tracer study, a procedure for estimating hydraulic properties of the distribution system, such as
residence time. Where more than one water source feeds the distribution system, tracer studies
can be used to determine the zone of influence of each source.
Trihalomethane (THM): one of the family of organic compounds named as derivatives of
methane, wherein three of the four hydrogen atoms in methane are each substituted by a halogen
atom in the molecular structure. (§141.2)
Water distribution system model, a computer program that can simulate the hydraulic, and in
some cases, water quality behavior of water in a distribution system.
Wholesale system: a public water system that treats source water as necessary to produce finished
water and then sells or otherwise delivers finished water to another public water system.
Delivery may be through a direct connection or through the distribution system of one or more
consecutive systems. (§141.2)
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
xii
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
1.0 Introduction
1.1 Purpose of this Manual
The intent of this manual is to help consecutive systems understand and meet the
requirements of the Stage 2 Disinfectants and Disinfection Byproducts Rule (DBPR). The Stage
2 DBPR defines a consecutive system as a public water system (PWS) that receives some or all
of its finished water from one or more wholesale systems. Delivery may be through a direct
connection or through the distribution system of one or more consecutive systems. Consecutive
systems that use a disinfectant other than ultraviolet (UV) light or that deliver water from
another system that has been treated with a disinfectant other than UV light are subject to the
Stage 2 DBPR.
Most Safe Drinking Water Act (SDWA) regulations promulgated to date have not
specifically addressed consecutive system requirements. Under the provisions of § 141.29, a
State may, with concurrence of the United States Environmental Protection Agency (EPA), have
modified monitoring requirements for a consecutive system to the extent that the interconnection
of a wholesale and a consecutive system justifies treating them as a single system for monitoring
purposes. Therefore, a consecutive system may not have been required by the State to conduct
monitoring for certain contaminants if the wholesale system has already monitored for those
contaminants.
The Stage 2 DBPR does not change § 141.29, so a State may still modify monitoring
requirements, with EPA's concurrence, for consecutive systems as described above. However, a
State has the flexibility to require a consecutive system to conduct its own distribution system
monitoring for disinfection byproducts (DBP) depending on factors such as the size of the
consecutive system's distribution system, the amount of distribution storage, and the quality of
the source water.
The Stage 2 DBPR may present certain challenges for consecutive systems. For
example, a consecutive system may receive water that has been disinfected and already contains
elevated levels of DBP. A consecutive system usually has no treatment facilities to control
DBPs already present in the water from the wholesale system, and limited ability to control the
continued formation of DBP in its own distribution system. For this reason, EPA has established
Best Available Technologies (BATs) specifically for consecutive systems in the Stage 2 DBPR.
EPA is aware of the difficulty in implementing consecutive system regulations because
the relationships between wholesale and consecutive systems are complex and varied. EPA is
also aware that there are a variety of State approaches to addressing regulatory requirements for
consecutive systems. The Stage 2 DBPR presents an opportunity for consecutive systems to
better define roles and responsibilities through discussions with their wholesaler and the State.
Some States have taken a very active role in establishing relationships between wholesale and
consecutive systems.
As discussed later in this document, some of the deadlines imposed by the Stage 2 DBPR
(deadlines related to the Initial Distribution System Evaluation (IDSE)) fall within six months of
rule promulgation. Although EPA has already provided guidance for consecutive systems to
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
1-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
comply with IDSE requirements, all consecutive systems, including those not previously
required to comply with the Stage 1 DBPR, are encouraged to contact their wholesaler and their
State to confirm their responsibilities for Stage 2 maximum contaminant level (MCL)
compliance. EPA has also provided other guidance, where appropriate, to assist PWSs and
States in implementing the Stage 2 DBPR.
1.2 Manual Organization
This guidance manual is organized as follows:
•	Chapter 1 - Introduction: Explains the purpose of this manual.
•	Chapter 2 - Overview of Existing Regulatory Requirements for Consecutive Systems:
Provides an overview of the provisions of existing regulations that apply to
consecutive systems.
•	Chapter 3 - Stage 2 DBPR Requirements for Consecutive Systems: Provides an
overview of the Stage 2 DBPR requirements that apply to consecutive systems.
•	Chapter 4 - Compliance Options for Consecutive Systems: Discusses BATs
identified by EPA for consecutive systems to decrease DBP formation in their
systems.
•	Chapter 5 - Other Alternatives for Consecutive Systems: Discusses alternatives other
than BATs for consecutive systems to reduce DBP formation in their systems.
•	Chapter 6 - Communication Strategies for Consecutive and Wholesale Systems:
Describes communication strategies for consecutive systems needing to coordinate
with wholesale systems to meet Stage 2 DBPR requirements.
•	Chapter 7 - Compliance Strategies for the Consecutive System: Suggests approaches
for consecutive systems in characterizing DBP formation in their system and how to
coordinate with the wholesaler on control strategies.
•	Chapter 8 - Frequently Asked Questions: Provides answers to questions frequently
asked by systems and States.
•	Chapter 9 - References: Provides a bibliographic list of references cited in this
manual.
Appendix A provides an example of a formal agreement between consecutive and
wholesale systems that meets the requirements of the State of Colorado. Other States may have
specific requirements that must be met in preparing these agreements.
This guidance manual is intended to address consecutive system-specific issues and
contains many references to rules other than the Stage 2 DBPR that may apply to consecutive
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
1-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
systems. References to appropriate guidance manuals are provided throughout this document.
Copies of these manuals can be obtained by:
•	Contacting the appropriate State office
•	Calling the Safe Drinking Water Hotline at 1-800-426-4791
•	Downloading from EPA's Web site at http://www.epa.gov/safewater or the specific
link cited in the reference.
•	Calling the National Service Center for Environmental Publications at 1-800-490-
9198 or visiting their Web site at http://www.epa.gov/ncepihom .
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
1-3
Draft for Discussion
Do not Quote. Do not Cite

-------

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
2.0 Overview of Existing Regulatory Requirements for Consecutive Systems
There are several existing drinking water regulations that contain provisions specifically
for consecutive systems. This chapter reviews the following regulations that address consecutive
system requirements:
•	Public Notification Rule
•	Consumer Confidence Report (CCR) Rule
•	Consecutive System Monitoring Requirements Under § 141.29
2.1 Public Notification Rule
The Public Notification Rule requires the owner or operator of any PWS to notify its
customers any time it incurs a violation of a national primary drinking water regulation
(NPDWR) and in other specific situations. The type of notification required varies depending on
the violation. Exhibit 2.1 shows the tier of notification required for certain types of violations or
situations as well as the notification frequency and method for each tier.
PWSs that sell or provide water to another public water system must give public notice to
its own customers as well as the owner or operator of the consecutive system (§141.201(c)(1)).
The consecutive system is then responsible for providing public notice to its own customers. If
the violation occurs in a portion of the distribution system that is physically or hydraulically
isolated from other parts of the distribution system, the State may allow the system to limit
public notification only to customers in that area of the distribution system. However, the
system must receive permission from the State in writing to limit distribution of the public notice
(§ 141.201(c)(2)).
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
2-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Exhibit 2.1 Tiers of Public Notice
Tier
Types of Situations
When Notice is Required
Examples of Appropriate
Notification Methods1
1
NPDWR violations and
situations with significant
potential to have serious
adverse effects on human
health as a result of short-
term exposure.
•	As soon as practical but no
later than 24 hours after the
system learns of violation.
•	Consult with State as soon
as practical but no later than
24 hours after learning of
the violation to determine
additional public notification
requirements.
•	Broadcast media
•	Posting in conspicuous
location
•	Hand delivery
•	Other method approved by
State
2
All other NPDWR
violations and situations
with potential to have
serious adverse effects on
human health.
•	As soon as practical but no
later than 30 days after the
system learns of violation.
•	Repeat notice required
every 3 months or as
determined by State for as
long as violation or situation
persists
•	Mail or other direct delivery
•	Newspaper notice
•	Posting in public places
•	Posting on the internet
•	Delivery to community
organizations
3
All other NPDWR
violations and situations
not included in Tier 1 and
Tier 2.
•	No later than 1 year after
system learns of violation.
•	Repeat notice required
annually.
•	Mail or other direct delivery
•	Newspaper notice
•	Posting in public places
•	Posting on the internet
•	Delivery to community
organizations
•	Inclusion in consumer
confidence report
Note that some notification methods are only available to certain types of systems.
For more information on Public Notification Rule requirements, refer to:
•	Public Notification Handbook (USEPA, 2000a)
•	The Public Notification Rule: A Quick Reference Guide (USEPA, 2000b)
2.2 Consumer Confidence Report (CCR) Rule
The CCR Rule requires community water systems to provide an annual report to their
customers that provides information on the quality of the water delivered by the system and any
risks from exposure to contaminants detected in the water. The report must be distributed by
July 1 of each year and must contain data collected during or prior to the previous calendar year.
Consecutive systems should include information about all purchased water in their CCRs.
Wholesale systems are required to deliver the applicable water quality information to
consecutive systems no later than April 1 of each year or by a date mutually agreed upon and
included in a contract between the consecutive and wholesale system (§ 141.152(d)).
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
2-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
For more information on CCR requirements refer to:
•	Preparing Your Consumer Confidence Report: Revised Guidance for Water Suppliers
(USEPA, 2005)
•	Consumer Confidence Report Rule: A Quick Reference Guide (USEPA, 2004b)
2.3 Consecutive Systems Monitoring Requirements (§ 141.29)
The provisions for consecutive systems under § 141.29 allow the State to modify the
requirements for combined distribution systems. When justified, the State may treat the
combined distribution system as a single system for monitoring purposes. Such systems must
follow a monitoring schedule specified by the State and concurred with by the Administrator of
the EPA.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
2-3
Draft for Discussion
Do not Quote. Do not Cite

-------

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
3.0 Stage 2 DBPR Requirements for Consecutive Systems
Many consecutive systems deliver water that has been treated with a disinfectant other
than UV light and which may therefore contain DBPs. Prior to promulgation of the Stage 2
DBPR, monitoring of consecutive systems for DBPs was not specifically addressed by SDWA
regulations. The intent of the Stage 2 DPBR with respect to consecutive systems is to present an
effective approach for identifying and resolving DBP problems, keeping in mind that
relationships between wholesale systems and consecutive systems are often complex and varied.
Depending upon the specific nature of these relationships, States have some flexibility in their
approach to the implementation of the Stage 2 DBPR requirements. Consecutive systems are
encouraged to contact their wholesale systems and their States as soon as possible after rule
promulgation to discuss applicable requirements and responsibilities.
This chapter describes the requirements of the Stage 2 DBPR that apply to consecutive
systems. The following rule requirements are discussed:
•	Disinfection Byproduct MCLs;
•	IDSEs;
•	Stage 2 (subpart V) Compliance Monitoring Requirements;
•	Disinfectant Residual Monitoring; and
•	Operational Evaluations.
3.1 Disinfection Byproduct Maximum Contaminant Levels
The MCLs for total trihalomethanes (TTHM) and haloacetic acid (five) (HAA5) have not
changed from the Stage 1 DBPR; however, the method of calculating compliance has changed.
For more information on Stage 2 DBPR compliance calculations, refer to Section 3.4. The
MCLs for DBPs are shown in Exhibit 3.1. The deadlines for complying with these MCLs are
shown in Exhibit 3.2.
Exhibit 3.1 DBP MCLs
Disinfection Byproduct
MCL (mg/L)
Bromate
0.010
Chlorite
1.0
TTHM
0.080
HAA5
0.060
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-1
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Exhibit 3.2 Stage 2 DBPR Compliance Schedule for Wholesale and Consecutive
Systems
Population Served by the Largest
System in the Combined
Distribution System1
Deadline for Compliance with Stage 2 DBPR (subpart V)
Monitoring Requirements2
> 100,000 people
April 1, 2012
50,000 - 99,999 people
October 1, 2012
10,000 - 49,999 people
October 1, 2013
< 10,000 people
October 1, 2013 if no Cryptosporidium monitoring is required
under LT2ESWTR
OR
October 1, 2014 if Cryptosporidium monitoring is required under
LT2ESWTR
1A combined distribution system consists of the distribution systems of wholesale systems and of the consecutive
systems that receive some or all of their finished water from those wholesale system(s) (§ 141.2).
2 If you are required to conduct quarterly monitoring, you must begin monitoring in the first full calendar quarter that
includes the compliance date in Exhibit 3.2. If you are required to conduct monitoring at a frequency that is less than
quarterly, you must begin monitoring in the calendar month recommended in the IDSE report (§ 141.601 or 141.602)
or the calendar month identified in the subpart V monitoring plan (141.622) no later than 12 months after the date
listed in Exhibit 3.2. The State may grant up to an additional 24 months for compliance if you require capital
improvements to comply
with an MCL.
3.2 Initial Distribution System Evaluation
This section briefly summarizes the Stage 2 DBPR IDSE requirements. For more
information on Stage 2 IDSE requirements, refer to the Initial Distribution System Evaluation
(IDSE) Guidance Manual for the Final Stage 2 Disinfectants and Disinfection Byproducts Rule
(USEPA, 2006a). A separate guide has also been developed to briefly summarize the
requirements for systems serving fewer than 10,000 people (USEPA, 2006b).
Community water systems of any size and nontransient, noncommunity water systems
(NTNCWS) serving at least 10,000 people are subject to the IDSE requirements if they use a
primary or residual disinfectant other than UV light or deliver water that has been treated with a
primary or residual disinfectant other than UV light. The purpose of the IDSE requirements is to
help systems select representative high TTHM and HAA5 compliance monitoring locations.
These sites are then used for compliance monitoring under the Stage 2 DBPR.
There are four options available for systems to meet IDSE requirements, depending on
their historical sampling data, size, and preference:
• Receive a Very Small System (VSS) Waiver. Systems serving fewer than 500
people may be eligible for a waiver from the State. Systems receiving the waiver
have no further IDSE requirements.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-2
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
•	Receive 40/30 certification. A
system has no further IDSE
requirements if the system can
certify to the State that all TTHM
and HAA5 compliance data are
less than or equal to 0.040 mg/L
for TTHM and 0.030 mg/L for
HAA5 during a specified two
year period. In addition, the
system must not have had any
TTHM or HAA5 monitoring
violations during the same
period.
•	Conduct a System Specific
Study (SSS). A system may
conduct an IDSE study based on
existing monitoring results or a
hydraulic model instead of
conducting IDSE standard
monitoring. A system's model or
existing monitoring results must
meet specific criteria to be used
in an SSS.
•	Conduct Standard Monitoring. IDSE standard monitoring entails one year of
distribution system monitoring. The sampling frequency and minimum number of
sample locations required depend on system characteristics such as size, source water
type, and whether the system is part of a combined distribution system.
Consecutive systems that do not apply a
chemical disinfectant were not specifically
addressed by Stage 1 DBPR requirements.
Therefore, these systems may not have historical
TTHM and HAA5 data unless the wholesale
system collected samples within the consecutive
system. In the absence of historic TTHM and
HAA5 data, systems must either conduct
standard monitoring or an SSS to comply with
the IDSE requirements. Consecutive systems
should consider obtaining Stage 1 data from the
wholesaler to assist in IDSE site selection if no
historical data exists.
The State sent a letter to each system
with a determination of the system's IDSE
schedule based on system characteristics. The
compliance schedule for consecutive and
wholesale systems was based on the population
of the largest system in the combined
distribution system. For purposes of complying
with the IDSE schedule, the State may have
determined that the combined distribution
system does not include certain consecutive
systems based on factors such as receiving
water from a wholesale system only on an
emergency basis or receiving only a small
percentage and small volume of water from a
wholesale system. The State may also have
determined that the combined distribution
system does not include certain wholesale
systems based on factors such as delivering
water to a consecutive system only on an
emergency basis or delivering only a small
percentage and small volume of water to a
consecutive system.
A combined distribution system consists of
the distribution systems of wholesale systems
and of the consecutive systems that receive
some or all of their finished water from those
wholesale system(s) (§ 141.2). For example,
if a Town purchases water from a City to
supplement its own groundwater supplies, the
combined distribution system includes the
City's and the Town's distribution systems.
Town System	City System
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-3
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
3.3 Stage 2 (subpart V) Compliance Monitoring Requirements
This section provides a brief summary of the Stage 2 (subpart V) compliance monitoring
requirements. For more information on Stage 2 DBPR monitoring, reporting, and recordkeeping
requirements, refer to:
•	Stage 2 DBPR Operational Evaluation Guidance Manual (USEPA, N.d.)
•	Initial Distribution System Evaluation Guidance Manual for the Final Stage 2
Disinfectants and Disinfection Byproducts Rule (USEPA, 2006)
•	Complying with the Stage 2 Disinfectant and Disinfection Byproducts Rule: Small
Entity Compliance Guide (USEPA 2007c).
A system is subject to the Stage 2 (subpart V) requirements if it is a community water
system or a NTNCWS and it uses a primary or residual disinfectant other than UV light or
delivers water that has been treated with a primary or residual disinfectant other than UV light.
Therefore, consecutive systems that do not apply a disinfectant but purchase water that has been
treated with a disinfectant must comply with these requirements. In addition, these consecutive
systems must now comply with the Stage 1 DBPR analytical, monitoring, and maximum residual
disinfectant level (MRDL) requirements for chlorine and chloramines. The chlorine and
chloramine requirements are discussed further in Section 3.5.
The MCLs for TTHM and HAA5 have not changed from the Stage 1 DBPR. However,
the method of calculating compliance has changed. Stage 2 DBPR compliance determination is
based on locational running annual averages (LRAAs) of TTHM and HAA5 concentrations.
Compliance must be met at each monitoring location, instead of using the system-wide running
annual average (RAA) required under the Stage 1 DBPR.
3.3.1 Stage 2 DBPR Monitoring Plan
Systems must develop a monitoring plan to be used for Stage 2 monitoring and
compliance determination (§ 141.622). The monitoring plan must include:
•	Monitoring locations;
•	Monitoring dates;
•	Compliance calculation procedures; and
•	Monitoring plans for any other systems in the combined distribution system if the
State has reduced monitoring requirements.
Note that many systems will recommend Stage 2 DBPR compliance monitoring locations
and dates as part of their IDSE report.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-4
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Systems using surface water, ground water under the direct influence of surface water
(GWUDI), or purchased surface water and serving more than 3,300 people must submit a copy
of the monitoring plan to the State prior to the date they are scheduled to collect their first Stage
2 DBPR compliance samples. All systems must keep the plan on file for State and public
review. A system that has been granted a VSS waiver must comply by updating its Stage 1
monitoring plan.
Systems may make modifications to their monitoring plan to reflect changes in treatment,
distribution system operations and layout (including new service areas), or other factors that may
affect TTHM or HAA5 formation. The State may also require modifications to the monitoring
plan.
3.3.2 Stage 2 DBPR Compliance Monitoring
Routine Monitoring
The Stage 2 DBPR routine monitoring requirements are shown in Exhibit 3.3. Systems
must comply with Stage 2 DBPR monitoring requirements by the deadlines shown in Exhibit 3.2
according to their Stage 2 DBPR monitoring plan. Consecutive and wholesale systems must
determine their compliance schedules based on the population of the largest system in the
combined distribution system.
Modified Monitoring for Combined Distribution Systems
The State is allowed to modify the Stage 2 DBPR monitoring requirements of wholesale
and consecutive systems on a case by case basis (§ 142.16(m)). These modifications would
allow the State to account for complex combined distribution systems, such as the following
cases (USEPA, 2007b):
•	Neighboring systems that buy and sell to each other regularly throughout the year;
•	Situations where water passes through multiple consecutive systems before it reaches the
user; and
•	A large group of interconnected systems.
The modified monitoring program must not undermine public health protection (USEPA,
2007b). The State may reduce the number of monitoring sites required for individual systems if
the reduced number adequately represents DBP levels throughout the distribution system. The
combined distribution system must have at least the minimum number of Stage 2 DBPR
monitoring sites and monitoring frequency shown in Exhibit 3.3 based on the source water type
and total population of the combined distribution system. In addition, each consecutive or
wholesale system must have at least one compliance monitoring location.
Systems should note that regulatory requirements present the minimum acceptable
monitoring program. Monitoring above and beyond regulatory requirements is advised if the
system has adequate resources. The additional monitoring data can help the system to be
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-5
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
24
25
26
27
28
proactive in identifying areas of the distribution system with potentially high DBP levels, and to
optimize operating practices to minimize DBP levels.
There is a primacy requirement for States to decide how they will handle monitoring in
consecutive systems. "States can satisfy this special primacy condition regarding consecutive
system monitoring by including a copy of the procedure they will use for addressing consecutive
systems outside the provisions of § 141.29. Alternatively, States can simply attest that they will
not use an authority to address consecutive system monitoring outside of § 141.29."
Consecutive systems are responsible for ensuring that required monitoring is completed
and the system is in compliance. Each consecutive system must base compliance on samples
collected within its distribution system. The consecutive system may conduct the monitoring
itself or arrange for the monitoring to be done by the wholesale system or another outside party.
Whatever approach it chooses, the consecutive system must document its monitoring strategy as
part of its DBP monitoring plan.
Exhibit 3.3 Stage 2 (subpart V) Routine Monitoring Requirements
Source
Water Type
Population Size
Category
Monitoring
Frequency1
Number of Distribution System
Monitoring Sites

<500
per year
2 2

500 - 3,300
per quarter
2 2
subpart H
3,301 -9,999
per quarter
2
10,000-49,999
per quarter
4

50,000 - 249,999
per quarter
8

250,000 - 999,999
per quarter
12

1,000,000-4,999,999
per quarter
16

.> 5,000,000
per quarter
20
Ground
Water
<500
per year
2 2
500 - 9,999
per year
2
10,000-99,999
per quarter
4

100,000-499,999
per quarter
6

. > 500,000
per quarter
8
All systems must take at least one dual sample set during the month of highest DBP concentrations. Systems on
quarterly monitoring (except for subpart H systems serving 500-3,300 people) must take dual sample sets every 90
days.
2 System is required to take individual TTHM and HAA5 samples (instead of a dual sample set) at the locations with
the highest TTHM and HAA5 concentrations, respectively. Only one location with a dual sample set per monitoring
period is needed if highest TTHM and HAA5 concentrations occur at the same location.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-6
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Reduced Monitoring
Systems may reduce the number or frequency of samples taken if all of the following
occur:
•	The LRAA is less than or equal to 0.040 mg/L for TTHM and 0.030 mg/L for HAA5
at each monitoring location.
•	Only data collected under the Stage 2 DBPR or Stage 1 DBPR (if you monitor at the
same Stage 1 locations for Stage 2) are used to qualify for reduced monitoring.
•	The source water annual average total organic carbon (TOC) level, before any
treatment, is less than or equal to 4.0 mg/L at each treatment plant treating surface
water or GWUDI based on monitoring conducted under the Stage 1 DBPR. Contact
your wholesaler to see if data are available.
Systems that were on reduced TTHM and HAA5 monitoring under the Stage 1 DBPR
may remain on reduced monitoring under the Stage 2 DBPR if all of the above criteria are met
and the system qualified for 40/30 certification or received a VSS waiver.
Systems may remain on reduced monitoring for as long as the following occur:
•	For systems on quarterly monitoring, the LRAA is less than or equal to 0.040 mg/L
for TTHM and 0.030 mg/L for HAA5 at each monitoring location
•	For systems on annual or less frequent monitoring, each TTHM sample is less than or
equal to 0.060 mg/L and each HAA5 sample is less than or equal to 0.045 mg/L.
•	The source water annual average TOC level, before any treatment, is less than or
equal to 4.0 mg/L at each treatment plant treating surface water or GWUDI based on
monitoring conducted under the Stage 1 DBPR.
However, States may require systems to return to routine monitoring at their discretion.
For example, if a system makes significant changes to its treatment or distribution system or if a
system changes monitoring locations, the State may require the system to return to routine
monitoring.
Increased Monitoring
Systems that are required to monitor at a particular location yearly or less frequently
under routine or reduced monitoring must begin increased monitoring at all locations if a TTHM
sample is greater than 0.080 mg/L or an HAA5 sample is greater than 0.060 mg/L at any
location. The system must increase monitoring to dual sample sets once per quarter at each
monitoring location. The system may return to routine monitoring after it conducts increased
monitoring for at least four consecutive quarters and the LRAA for every monitoring location is
less than or equal to 0.060 mg/L for TTHM and 0.045 mg/L for HAA5. Systems that were on
increased monitoring under the Stage 1 DBPR must remain on increased monitoring under the
Stage 2 DBPR until the criteria for returning to routine monitoring are met.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-7
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
3.3.3 Reporting and Recordkeeping Requirements
Systems must report the results of Stage 2 (subpart V) TTHM and HAA5 monitoring to
the State within 10 days of the end of any quarter in which monitoring is required. Systems
conducting quarterly monitoring must calculate the LRAAs for TTHM and HAA5 by averaging
the data from the most recent four quarters of monitoring. For systems that conduct monitoring
yearly or less frequently, each sample is considered the LRAA for that monitoring location.
However, if any single sample has a TTHM or HAA5 concentration greater than the MCL, the
system does not incur a violation immediately. Instead, the system must begin increased
monitoring.
Systems that are seeking to remain on reduced monitoring must also submit the results of
source water TOC monitoring for each surface water or GWUDI source. Note that source water
samples must be taken prior to treatment and would probably have to be taken by the wholesaler.
Systems must retain all monitoring results for ten years.
3.4 Disinfectant Residual Monitoring
Consecutive systems that do not add a chemical disinfectant to the water may not have
previously monitored to determine compliance with the MRDLs for chlorine and chloramines.
The Stage 2 DBPR now specifically requires consecutive systems that deliver water that has
been treated with a disinfectant other than UV light to comply with the following requirements
for chlorine and chloramines:
•	Analytical requirements in § 141.131(c). This section lists approved methods for
chlorine and chloramine residual monitoring. The rule allows systems to use N, N-
diethyl-p-phenylenediamine (DPD) kits, among other methods, for measuring these
residuals. Only a party approved by EPA or the State may measure the residual
disinfectant concentration for compliance.
•	Monitoring requirements in § 141.132(c)(1). Systems must measure the residual
disinfectant concentration at the same time and location as total coliforms are
sampled. Reduced monitoring is not allowed.
•	Compliance requirements in § 141.133(c)(1). Systems must determine MRDL
compliance using an RAA, computed quarterly, of monthly averages of residual
disinfectant samples collected for compliance. If the RAA exceeds the MRDL, the
system is in violation of the MRDL and must report to the State and notify the public.
Systems that switch between chlorine and chloramines must calculate compliance
using results of both chlorine and chloramine residual monitoring together. The
MRDL for chlorine is 4.0 mg/L and the MRDL for chloramines is 4.0 mg/L (§
141.65).
•	Reporting requirements in § 141.134(c). Systems must report the results of chlorine
and chloramine monitoring to the State by the tenth day of the month following the
end of each quarter. Systems must report the number of samples taken during each
month of the last quarter, the monthly average for samples taken in each of the last
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-8
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
twelve months, the average of all monthly averages for the last twelve months, and
whether the MRDL was exceeded. The State may instead choose to perform the
calculations and determine compliance for the system.
Systems must comply with these requirements beginning April 1, 2009 unless required to
do so earlier by the State.
For more information on Stage 1 DBPR requirements, refer to:
•	The Stage 1 Disinfectants and Disinfection Byproducts Rule: What Does it Mean to
you? (USEPA, 2001)
•	Alternative Disinfectants and Oxidants Guidance Manual (USEPA, 1999a)
3.5 Operational Evaluations
The Stage 2 Microbial-Disinfection Byproducts (M-DBP) Agreement in Principle
acknowledges that DBP peaks will sometimes occur, even when systems are in full compliance
with the enforceable MCL. The operational evaluation requirements of the Stage 2 DBPR help
identify and reduce these peaks. The rule establishes operational evaluation levels of 0.080 mg/L
for TTHM and 0.060 mg/L for HAA5. A system exceeds the operational evaluation level at any
monitoring location where one of the following occurs:
•	The two previous quarters' TTHM results plus twice the current quarter's TTHM
result, divided by four, exceeds 0.080 mg/L, or
•	The two previous quarters' HAA5 results plus twice the current quarter's HAA5
result, divided by four, exceeds 0.060 mg/L.
A system that exceeds the operational evaluation level must conduct an operational
evaluation and submit a written report of the evaluation to the State no later than 90 days after
being notified of the analytical result that caused it to exceed the operational evaluation level.
The operational evaluation must include an examination of system treatment and distribution
operational practices. However, you may request that the State allow you to limit the scope of
your operational evaluation if you are able to identify the cause of the operational evaluation
level exceedance to the State's satisfaction. The operational evaluation must also include steps
that could be considered to minimize the possibility of future operational evaluation level
exceedances.
An operational evaluation level exceedance is not a violation of the Stage 2 DBPR.
However, failure to conduct an operational evaluation and submit the report to the State in the
required time frame is a violation and requires Tier 3 public notice (as required by the Public
Notification Rule).
For more information on operational evaluations refer to EPA's Stage 2 DBPR
Operational Evaluation Guidance Manual (USEPA, N.d.).
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-9
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1	3.6 Simultaneous Compliance
2
3	Systems may encounter compliance issues with the Long Term 2 Enhanced Surface
4	Water Treatment Rule (LT2ESWTR) when making changes to comply with the Stage 2 DBPR,
5	and vice versa. In addition to the challenges of complying with the suite of M-DBP rules
6	simultaneously, a water system operator must also ensure that changes in treatment do not
7	adversely affect compliance with other drinking water regulations, such as the Lead and Copper
8	Rule (LCR) and Total Coliform Rule (TCR). Guidance on how to address these potential
9	conflicts can be found in EPA's Simultaneous Compliance Guidance Manual (USEPA, 2007a).
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
3-10
Draft for Discussion.
Do not Quote. Do not Cite.

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
4.0 Compliance Options for Consecutive Systems
Consecutive systems purchase finished water from wholesale systems and may have
limited control over the quality of water entering the distribution system. Many purchasing
agreements specify the quantity of water available to a consecutive system from a wholesale
system, but may not include specific water quality requirements. When water quality is
included, purchasing agreements may stipulate only that water quality at the consecutive system
entry point will meet all State and Federal regulations. However, because DBP concentrations
can increase, sometimes significantly, from the consecutive system entry point through the
distribution system, consecutive systems may at times have difficulty meeting the Stage 2 DBPR
MCLs for TTHM and HAA5. As a result, there will be instances in which it is necessary for
consecutive systems to implement treatment and/or operational changes to comply with the Stage
2 DBPR.
This chapter discusses the treatment and operational alternatives most likely to be
available to consecutive to control DBP levels in treated water and comply with Stage 2 DBPR.
This chapter includes the following sections:
4.1	DBP Control in Consecutive Systems
4.2	Water Age Management
4.3	Reduction of Disinfectant Demand
4.4	Chloramination
4.1 DBP Control in Consecutive Systems
Depending on the wholesale system-consecutive system physical arrangement and
hydraulic characteristics, DBP concentrations may be higher in the consecutive system than in
the wholesale system. This is particularly true when consecutive systems receive water through
a distribution grid rather than dedicated transmission mains. In such cases, the water entering the
purchasing system may already be several days old. Increased water age generally results in
increased distribution system DBP concentrations. Under the Stage 2 DBPR, wholesale systems
are not required to make treatment or operational modifications necessary to reduce DBP
concentrations in their consecutive systems as long as the wholesale system meets the MCLs
within its own distribution system. In such cases it may be necessary for the consecutive system
to implement treatment or operational changes to reduce distribution system DBP concentrations
and comply with the Stage 2 DBPR.
The treatment or operational changes considered and ultimately implemented by a
consecutive system to reduce DBP concentrations will depend on the factor(s) causing the high
DBP levels. The factors that most significantly impact DBP formation are:
• Disinfectant type and dose. The type and dose of a disinfectant has a significant
impact on DBP formation. Chlorine is the most common primary disinfectant used in
water treatment, but it reacts with natural organic matter (NOM) to form chlorinated
DBPs such as trihalomethanes (THMs) and haloacetic acids (HAAs). Some of the
alternative primary disinfectants to chlorine are chlorine dioxide, ozone, and UV
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
light. While these alternative disinfectants can help to reduce levels of chlorinated
DBPs, they form other types of byproducts. Secondary disinfectants used to maintain
a residual in the distribution system include chlorine and chloramines.
•	Inorganic DBP precursor concentrations. Bromide reacts with chlorine to form
hypobromous acid, which is more aggressive in forming DBPs than chlorine
(hypochlorous acid). Bromide cannot be cost-effectively removed at this time.
•	Organic DBP precursor concentration. NOM reacts with disinfectants to form DBPs.
Treatment processes that may help to reduce levels of organic DBP precursors
include enhanced coagulation, powdered activated carbon (PAC), granular activated
carbon (GAC), ozone and biological filtration, and nanofiltration.
•	pH. DBP formation is affected by the pH of the water. Chlorination at higher pH
forms a higher amount of THMs, while the opposite is true for HAAs. Water at a
higher pH may also require a higher chlorine dose to maintain a consistent level of
microbial inactivation before entering the distribution system to comply with the
Surface Water Treatment Rule (SWTR). However, changes to pH to control DBPs
should be carefully considered to prevent a decrease in corrosion control
effectiveness in the distribution system and to avoid possible lead and copper
corrosion problems.
•	Temperature. Seasonal variations in water temperature during treatment and in the
distribution system can have an effect on the reaction rate. Higher temperatures
increase reaction rates between DBP precursors and disinfectants to produce higher
levels of DBPs.
•	Water age. The contact time between disinfectants and DBP precursors has a
significant effect on DBP formation. As the reaction time with the disinfectant
increases, so does DBP formation. However, biodegradation may actually reduce
HAA5 levels if adequate disinfectant residuals are not maintained.
These factors are discussed in greater detail in the Stage 2 DBPR Initial Distribution
System Evaluation (IDSE) Guidance Manual (USEPA, 2006), Operational Evaluation Guidance
Manual (USEPA, N.d.), and Stage 2 M-DBP Simultaneous Compliance Guidance Manual
(USEPA, 2007).
Among the major factors identified above, the removal of DBP precursors and pH
adjustment are typically achieved at the treatment plant of the wholesale system. Controlling the
water temperature is not a practical option for DBP control. Accordingly, the Stage 2 DBPR
identifies two BATs for consecutive systems to reduce DBP formation:
•	For systems serving fewer than 10,000 people: hydraulic flow and storage
management to control and reduce water age.
•	For systems serving at least 10,000 people: chloramination with hydraulic flow and
storage management.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
These options are discussed further in sections 4.2 and 4.3.
Consecutive systems should consult their purchasing agreement with their wholesaler
before making modifications to reduce distribution system DBP concentrations. Purchasing
agreements may prevent the consecutive system from adding treatment chemicals or making
other system modifications. If so, the consecutive system may need to renegotiate its purchasing
agreement to add ammonia to convert free chlorine to chloramines. Purchasing agreements may
also assign responsibility for such modifications to the wholesaler.
4.2 Water Age Management
Water age is a significant factor in DBP formation. As water travels through the
distribution system, chlorine continues to react with NOM to form DBPs. The longer the travel
time or water age, the more likely it is that water quality will degrade and exhibit higher TTHM
and HAA5 concentrations, reduced levels of residual chlorine, reduced effectiveness of chlorine
residual through formation of organochlorine compounds, increased microbial activity,
nitrification, and/or taste and odor problems. Where high water age is considered to be a
contributing factor to elevated DBP concentrations, consecutive systems might consider adoption
of operational practices to reduce water age in finished water storage facilities and distribution
system piping.
Some of the methods to reduce water age by hydraulic flow and storage management
include:
•	Pipe looping,
•	Managing valves,
•	Bypassing oversized pipes,
•	Installing dedicated transmission main,
•	Improving tank mixing and turnover,
•	Eliminating excess storage and tanks in series, and
•	Reducing the age of water delivered from the wholesale system, if a dedicated
transmission main is not already used.
These methods to reduce water age are discussed below. Additional information about
reducing water age in a distribution system can be found in the Operational Evaluation
Guidance Manual (USEPA, N.d.).
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-3
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
4.2.1 Pipe Looping
The highest DBP concentrations in a distribution system are most often observed at dead-
ends (although this may not be true for HAAs because of biodegradation). Water at dead-ends is
often stagnant and therefore provides long contact times for DBP formation. Excessive
hydraulic residence time at dead ends can be reduced with pipe looping, which involves
constructing new pipe sections to make appropriate hydraulic connections among existing pipes.
Pipe looping may not always eliminate water age problems. For example, if two distribution
pipes with low demand are looped together and there is insufficient demand to cause water to
circulate, then an even larger hydraulic dead-end may result. This may create an even larger area
in the system that is subject to water quality problems resulting from high water age, such as
high DBP concentrations. Therefore, the specific hydraulic response of a system to looping
should be assessed to make sure that looping does not negatively impact the residence time of
other parts of the system. Further information on pipe looping can be found in the book
Comprehensive Water Distribution Systems Analysis Handbook published by AWWA (Boulos,
Lansey and Karney 2006).
4.2.2	Managing Valves
Intentional or unintentional closed valves in a distribution system may create stagnant
water leading to high DBP levels in those locations. The presence of unintentional closed valves
could be due to some valves being inadvertently turned in the wrong direction or being broken.
These valves may remain undetected due to poor record keeping or because the valve boxes are
buried or paved-over. A comprehensive valve inventory and maintenance program can help
systems locate valves, determine their status, and find improperly positioned and broken valves.
4.2.3	Bypassing Oversized Pipes
In portions of a distribution system where pipes are oversized, the water velocity is lower
and therefore hydraulic residence times are longer than necessary, causing high DBP levels.
Areas of a distribution system that have been abandoned or have experienced negative demand
growth over many years may contain oversized pipes, causing excessive hydraulic residence
time. Where appropriate, the pipe sizes in these areas can be reduced or sections of pipes can be
valved off if they are no longer needed to reduce the residence time of water. However, the
effect of bypassing or valving oversized pipes on downstream areas should be evaluated to make
sure that such modifications will not cause hydraulic constrictions for the downstream areas.
4.2.4	Installing Dedicated Transmission Main
When water travels through low demand areas and finished water storage facilities in a
distribution system before reaching a consecutive system, the water at the entry point to the
consecutive system may have high DBP levels due to high water age. In such cases, the
installation of a dedicated transmission main to supply water to the consecutive system can be
considered to reduce water age but its effects on water age in the wholesale system should be
estimated.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-4
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
4.2.5 Improving Tank Mixing and Turnover
Excessive hydraulic residence time in distribution storage tanks results in high water age,
which can cause high DBP levels in the tank and at downstream locations in the distribution
system. The average hydraulic residence time in a tank can be estimated by the following
equation:
Theoretical average hydraulic residence time = [Vmax/(Vmax - Vmin)]/N
where	Vmin = average minimum daily volume
Vmax = average maximum daily volume
N = number of drain/fill cycles per day
(Units for Vmax and Vmin must be consistent)
It is important to recognize that the above equation provides information about the
average amount of time spent by water inside a tank. In poorly mixed storage tanks, water age
may actually be much higher (or lower) than the average hydraulic residence time in some
portions of the tank. The Vmax and Vmin values are numbers that are averaged from data collected
over several days or weeks to represent the typical operational characteristics of the tank. If tank
operations are changed from one season to another, then the Vmax and Vmin values may be
different during different seasons. Typically, the average hydraulic residence time for a storage
tank should not exceed 5 days (Kirmeyer et al., 1999). However, some systems may need much
lower hydraulic residence times due to site-specific water quality constraints.
The average hydraulic residence time in a storage tank can be reduced by increasing the
volume turnover. The volume turnover can be increased by increasing the volume of water that
flows in and out of a tank during a given fill/drain cycle (the drawdown), or by increasing the
number of fill/drain cycles per day. When possible, the recommended approach is to increase
the drawdown between fill cycles. Increasing the number of fill/drain cycles is only effective
when 1) the tank is well-mixed at the end of each fill cycle and 2) the drawdown between each
fill/drain cycle is equal to the original drawdown. Increasing turnover by either of these
strategies may be limited by system hydraulic (pressure) constraints. It may be necessary to
adjust tank water level controls or the control settings for altitude valves to increase turnover.
Improving storage tank mixing characteristics can reduce average water age and
minimize stagnant zones in the tank. These stagnant zones often have higher water age and thus
tend to have higher DBP concentrations. Several tools can be employed to predict water mixing
characteristics of a tank:
•	Desktop evaluations of hydraulic residence time, fill time, and inlet momentum.
•	Computational fluid dynamic (CFD) modeling.
•	Temperature measurements.
•	Disinfectant residual measurements.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-5
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
The mixing predictions from desktop evaluations, CFD modeling, temperature
measurements, and disinfectant residual measurements can be used to identify a storage tank
with inadequate mixing and, therefore, a potential for high DBP formation in some regions in the
tank. A method to estimate hydraulic residence time in a tank was presented previously in this
section. Fill time and inlet momentum can be estimated from operational records and SCADA
data. Generally, longer fill times and greater inlet momentum result in better tank mixing. The
minimum acceptable hydraulic residence time and inlet momentum is tank- and situation-
specific, and depends on a number of system factors, including water quality, tank geometry,
inflow rate, and inlet/outlet pipe configuration.
CFD modeling provides a qualitative description of mixing characteristics by providing
visual images of mixing inside a tank. It can be used to determine the effects of fill time and
inlet momentum on mixing characteristics.
Poor mixing conditions can cause thermal stratification in a tank. Thermal stratification
in turn can exacerbate the poor mixing condition. Depending on the location and orientation of
the inlet pipe and tank geometry, the water entering a tank from buried pipes may be cooler than
the bulk water in the tank during the summer or warmer than the bulk water in the tank during
the winter. In a tank with poor mixing characteristics, colder, denser water remains in the lower
portion of the tank, whereas the warmer, less dense water has a tendency to rise to the top of the
tank. Water temperature profiles can be used to determine the existence of thermal stratification
inside a tank. The temperature profiles can be obtained from the collection of continuous water
temperature measurements at various locations in the tank over the course of several days.
Temperature differences as low as 1°C between the top and bottom of a tank may indicate a
thermally stratified tank with poor mixing.
Exhibit 4.1 shows cross-section views of water mixing characteristics observed in a
standpipe tank under slightly different temperature conditions. In this test, a solution containing
a one milligram per liter concentration of dye was added to water flowing into the tank. The dye
concentrations in the tank were then monitored for a one-hour period. The left-hand profile
shows the tank with a bulk water temperature 1° C warmer than the temperature of incoming
water. Note that the incoming, colder water remains in the lower portion of the tank. This water
will be the first to exit as demand draws water from the tank. The right-hand profile shows
much improved mixing when the inflow water and the tank water were at the same temperature.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-6
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Exhibit 4.1 Effect of Temperature Differential Between Inflow and Tank Bulk
Water on Mixing Characteristics
36" vertical inlet
1 mg/L tracer after 60 mins
Cone
0.8
0.6
0.4
0.2
0.1
0.01

Tank temp 1 C > Inlet Temp
Isothermal condition (20 C)
Disinfectant residual measurements, collected either as grab samples or from continuous
online monitoring at various locations in the tank, can also be used to evaluate mixing and
identify water quality stratification. Acceptable differences in disinfectant residuals within a
tank is location-specific and depends on the system water quality. However, the minimum
residual should be sufficient to minimize microbial growth and water quality degradation.
Additional information about the use of desktop evaluations, CFD modeling, temperature
measurements, and disinfectant residual measurements to evaluate water mixing characteristics
in storage tanks, and operational and/or physical modifications to improve mixing characteristics
is presented in Water Quality Modeling of Distribution System Storage Facilities (Grayman et
al., 2000) and Evaluation of Water Mixing Characteristics in Distribution System Storage Tanks
(Mahmood et al., 2005).
Once the water mixing characteristics of a storage tank have been evaluated, appropriate
operational and/or physical modifications can then be recommended to improve water mixing in
the tank. The mixing characteristics can be improved by operational changes, which include
filling a tank for a longer time period and increasing inlet momentum. If operational changes are
not possible, then the mixing characteristics can also be improved by design modifications, such
as changing the location, orientation, and/or diameter of inlet/outlet pipes.
Inlet momentum (defined as velocity x flow rate) is a key factor for mixing water in a
storage tank. As the inlet momentum increases, the mixing characteristics in the tank improve.
The inlet momentum can be increased by increasing the flow rate (which also has the desirable
effect of increasing the velocity), through installation of booster pumps near the tank, or other
means. However, increasing the flow rate may not be practical due to the limitations of system
hydraulics. For example, distribution system pressure may not be adequate to achieve desirable
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-7
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
increases in flow rates, or a pump may not be available at the tank location to increase the
pumping rate into the tanks. In such cases, the inlet velocity can be increased by reducing the
inlet diameter.
The location and orientation of the inlet pipe relative to the tank walls can have a
significant impact on mixing characteristics. As water enters a tank through an inlet pipe, a jet is
formed and the water present in the tank is drawn into the jet. This forms circulation patterns
that result in mixing. The path of the jet must be long enough to allow the mixing process to
develop, and therefore should not be pointed directly towards nearby impediments such as a wall
or deflector. For example, in a tall, narrow tank, a horizontal inlet pipe at the bottom of the tank
is likely to cause the water jet to hit the vertical wall of the tank, resulting in loss of inlet
momentum and poor mixing near the top portion of the tank. In general, outlet pipes are located
near the bottom of tank, and relocating the inlet pipe near the top of tank may improve mixing
characteristics. However, the system hydraulics should be evaluated to ensure there would be
adequate pressure to allow the tank to fill to the desired level. Inlet pipes located near the bottom
of a tank can be angled upwards, or multiple inlet pipes can be used to improve mixing
conditions in a tank. The optimum inlet pipe location and orientation to obtain good mixing in a
tank depends on a number of site-specific factors including tank geometry, inflow rate, and
temperature differences between the inflow and the bulk water in the tank. Exhibit 4.2 shows
predicted mixing characteristics in tanks with two different inlet pipe orientations based upon the
results of CFD modeling. The left-hand profile shows limited mixing in a tank with a horizontal
inlet. The right-hand profile shows much improved mixing in a tank with a vertical inlet.
In water treatment plant basins, where contact time is required for disinfection and there
is generally simultaneous inflow and outflow, internal baffles are sometimes placed inside the
basins to encourage plug flow conditions. However, chlorine contact time is usually not an issue
in distribution system tanks and reservoirs and baffles should generally be avoided. Baffles
encourage plug flow conditions and can result in poor mixing zones (dead zones). Consequently,
baffled tanks are likely to experience more significant disinfectant residual decay than tanks with
mixed flow conditions. Furthermore, dead zones within baffled tanks can have higher water age
and therefore higher DBP concentrations. There may be special circumstances, such as separate
inlet and outlet pipes in close proximity to each other, under which a baffle wall may be
desirable to force water into other parts of the tank. However, because of the wide variations in
tank geometry and inlet/outlet piping configurations for storage tanks, the use of baffles should
be carefully evaluated for each specific situation to determine if baffles have any beneficial
impact. Tracer testing, CFD modeling, and disinfectant residual monitoring are useful tools to
determine the effects of baffles, and to optimize the location, and orientation of the inlet/outlet
pipes.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-8
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Exhibit 4.2 Effect of Inlet Pipe Orientation on Mixing Characteristics
(3D) I 13-liiaa) iHyfroTarfctfefeuHdW	' 3 Jl2000 I Hfd-oTai*(fefej difl"
Isothermal condition (20 C)
1 rrgfL tracer after 30 rrins
36' horizontal inlet	36" vertical inlet
4.2.6 Eliminating Excess Storage and Tanks in Series
Historically, distribution system storage tanks have generally been built to provide
adequate pressures, fire flows, and to meet peak demands. Tanks are also often designed to
accommodate future growth and long-term water system needs. Therefore, some distribution
system storage tanks may be oversized. Storage tanks may also be hydraulically isolated from
the distribution system due to high system pressures, low system demands, or inadequate tank
height. Oversized tanks and/or tanks that are hydraulically locked out (due to system pressure
being higher than the maximum water level in the tank most of the time) may not have adequate
volume turnover, resulting in high water age and high DBP formation potential. When events
such as main breaks, fire flows, or other unexpected peak demand conditions occur in a system,
water from these tanks may be drawn into the distribution system. Areas receiving water from
these tanks may have higher than normal DBP levels.
There are limited options for improving mixing characteristics and reducing water age for
a tank that is oversized or hydraulically isolated under normal system operating conditions. It
may be possible to increase volume turnover in a tank that is hydraulically isolated if the
operational hydraulic grade in the vicinity of that tank can be lowered. This may be
accomplished by valving off pipe sections during certain hours so that water demand in the
vicinity of the tank is supplied primarily by the tank rather than from other parts of the
distribution system. More water can be forced in and out of an oversized tank on a daily basis by
installing pumps, adjusting pumping schedules (if pumps already exist), or adjusting the control
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-9
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
settings for altitude valves. However these modifications may not be feasible due to system
hydraulic limitations. In such cases, decommissioning of the tank can be considered. If a
consecutive system has such a tank, and the wholesale system has another tank in the vicinity
with adequate storage, then the consecutive system tank may be able to decommission its tank.
However, coordination with the wholesale system is necessary to ensure that when the
consecutive system's tank is decommissioned, the wholesale system's tank has adequate
hydraulic capacity (both storage and piping) for equalization storage, fire flow, or emergency
conditions such as main breaks. Refer to Chapter 6 for additional information about
communicating with the wholesale system.
Tanks in series can also lead to high DBP levels in areas downstream of the tanks if there
is inadequate mixing and volume turnover in the tanks. If the mixing and volume turnover issues
cannot be addressed, consideration should be given to whether water can be re-routed to the
distribution system pipe network directly rather than through other tank(s). Re-routing the water
flows will involve adjusting valve positions in the pipe network and pumping set points and
schedules. A system operational analysis (generally using a hydraulic model) will be needed to
determine the pressure and flow impacts caused by re-routing the water flow. Elimination of
tanks in series may reduce the volume turnover in these tanks due to associated changes in
frequency and magnitude of the drain/fill cycles; therefore, these impacts need to be evaluated.
4.3 Reduction of Disinfectant Demand
Aging pipes such as unlined cast iron pipes exert high disinfectant demand because of
the presence of corrosion byproducts, biofilms, and sediment deposits. Consecutive systems can
reduce localized chlorine decay and thus reduce the overall disinfectant demand by replacing or
cleaning and lining pipes, and/or by conducting periodic flushing.
4.3.1 Replacing or Cleaning and Lining Unlined Cast Iron Pipes
Pipe replacement may be the preferred option for reducing disinfectant demand if a
pipeline has structural problems or if there is a need to increase hydraulic capacity with a larger
diameter pipe. If a pipeline is structurally sound, then pipe cleaning is a less expensive option.
For unlined cast iron pipes, pipe lining may also be necessary to achieve a permanent
improvement and prevent a recurrence of the disinfectant demand problem. The AWWA
Standard, Rehabilitation of Water Mains (M28), 2nd Ed. (AWWA 2001), provides information
and guidance on cleaning and lining technologies.
4.3.2 Distribution System Flushing
Periodic flushing can be an effective tool to control TTHM and HAA5 peaks to remove
pipe sediments and biofilms, thereby reducing disinfectant demand. There are several approaches
to conducting distribution system flushing depending on system configuration and water quality
goals. The AwwARF report, Guidance Manual for Maintaining Distribution System Water
Quality (Kirmeyer et al. 2000) provides detailed information on various flushing approaches.
Regardless of the flushing method implemented, utilities should use water quality data to identify
periods when DBPs have historically been high. However, utilities cannot simply flush in the
October 2007 Draft Stage 2 DBPR	4-10	Draft for Discussion
Consecutive Systems Guidance Manual	Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
area where DBP samples are collected prior to sampling dates for the purposes of reducing DBP
compliance monitoring results. This practice is not allowed because such intermittent flushing is
not considered normal operations.
Conventional flushing is considered routine distribution system maintenance and is
conducted by opening hydrants without directing the flow through the distribution system with
isolation valves. Fire hydrants are usually opened and allowed to run until the water clears.
While utilities often move through the system sequentially when practicing conventional
flushing, this should not be confused with directional flushing. The velocities used for
conventional flushing may be inadequate (less than 5 feet/second) for removing sediment,
corrosion byproducts, and other debris that can contribute to high DBP levels. It is also possible
to draw dirty water from other areas into the areas being flushed. Additional information on
flushing practices and selection of flushing velocities can be found in the AwwaRF report,
Establishing Site-Specific Flushing Velocities (Friedman et al. 2003).
Directional flushing involves the flushing of water in one direction through systematic
operation of distribution system valves. Utilities practicing directional flushing typically begin
at a source of clean water (e.g., a large transmission main) and systematically move through the
system opening hydrants and manipulating system valves to assure water moves in only one
direction through the system. Because water travels toward a hydrant in a single direction,
higher flushing velocities can be achieved. A properly designed and implemented directional
flushing program can achieve water velocities higher than 5 feet/second to scour the pipe. In
addition to increasing water flow in the selected main, directional flushing can reduce the impact
of other factors contributing to the formation of high DBP concentrations including the
accumulation of sediments and the build-up of corrosion byproducts. (Joseph and Pimblett,
2000)
"Blow-offs" can be used to eliminate dead-ends and stagnant water zones that have high
water age and therefore contribute to high DBP levels. Blow-offs can operate in an automatic
intermittent mode or continuous mode to remove old water from dead-end or stagnant zones and
pull fresher water into these locations from other areas. The velocities for a blow-off are
generally insufficient (< 2.5 feet/second) to remove sediments or biofilm. Blow-offs can be used
on a seasonal basis when DBP peaks are more likely to occur, such as during high water
temperature periods. The need for and appropriate locations for blow-offs can be determined
from distribution system flow models or distribution system historical records. Low disinfectant
residuals, high DBP concentrations, high heterotrophic plate counts (HPCs), coliform-positive
samples, or nuisance bacteria are often associated with high water age locations.
Whenever flushing is used, it may be necessary to dechlorinate or dechloraminate
flushing water to prevent adverse impacts on nearby streams. Both chlorine and chloramines can
have negative impacts on aquatic environments. Depending on where flushed water is
discharged, it may end up in nearby streams or other bodies of water. In such cases, a
dechlorinating agent (e.g., sodium bisulfite or sodium thiosulfate) can be used to prevent fish
kills or other adverse effects. Consult your State or local regulatory agency to determine if it is
necessary to dechlorinate or dechloraminate flushing discharges. Also consider discharging the
flushed water to the sewer system.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-11
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
4.4 Chloramination
As identified in Section 4.1, the disinfectant type can be a significant factor in DBP
formation. Where the use of free chlorine is considered to be a contributing factor to elevated
DBP concentrations, consecutive systems might consider switching to chloramines for secondary
disinfection. THM and HAA formation is generally significantly lower for chloramines than for
free chlorine. However, consecutive systems should consider the following issues before
switching from free chlorine to chloramines:
•	Water quality issues for chloramines such as the formation of other currently
unregulated DBPs, nitrification, corrosion, and taste and odor issues.
•	Whether to switch all or only a portion of the distribution system to chloramines.
•	Cost, handling, and safety issues.
These issues are discussed further in the following sections. Additional information on
chloramination can be found in EPA's Simultaneous Compliance Guidance Manual for the Long
Term 2 and Stage 2 DBP Rules (USEPA, 2007a)
4.4.1 Water Quality Issues for Chloramines
Chloramines are an effective secondary disinfectant because they are generally less
reactive than free chlorine causing them to be more persistent in the distribution system and are
able to better penetrate biofilms. This greater persistence allows some utilities (e.g., large
systems in warm water climates), who would otherwise be unable to maintain a disinfectant
residual using free chlorine, to maintain a residual in the distribution system. In addition, the
concentrations of TTHM and HAA5 usually decrease when switching from free chlorine to
chloramines. Chloramines can react with organic precursor material to form THMs, but the
reaction rates are very slow compared to free chlorine. Chloramines are highly effective at
reducing THM formation levels in the distribution system and the reduction in THM levels is
generally 40 to 80 percent compared to free chlorine. Chloramines also produce lower levels of
HAAs than free chlorine, but may not be effective in controlling all types of HAAs. Some
brominated HAAs are formed with chloramines. Chloramines generally produce lower levels of
total chlorinated byproducts than free chlorine.
Potential operational and simultaneous compliance issues when using chloramines
include the following:
•	Nitrification,
•	Increased corrosion and metal release,
•	Taste and odor issues,
•	Weaker disinfectant,
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-12
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
•	Blending issues - chloraminated and chlorinated waters,
•	Safety concerns,
•	Issues with ozonation and GAC filtration, and
•	Issues for dialysis patients, fish owners and industrial customers.
The reader is referred to EPA's Simultaneous Compliance Guidance Manual for the Long
Term 2 and Stage 2 DBP Rules (USEPA, 2007a) for more detailed information on these issues.
4.4.2 Options for Chloramine Conversion
When the wholesaler uses free chlorine for secondary disinfection and the consecutive
system switches to chloramines for secondary disinfection of the water it provides, the
consecutive system has two options for managing their water with disinfectants:
•	Option 1: Convert part of the consecutive system's distribution system to chloramines
and physically separate that area from the wholesaler's and other areas of the
consecutive system's distribution systems.
•	Option 2: Convert the consecutive system's entire distribution system to chloramines
and physically separate the system from the wholesaler's system.
Option 1
The first option may be considered if the consecutive system only needs to reduce high
DBP levels in specific areas. Depending on the hydraulic characteristics of the distribution
system, it may be feasible to isolate the chlorinated water from the chloraminated water in the
same way that different pressure zones are isolated. The separation of the waters in the
distribution system can be an inexpensive solution if it only involves closing a few existing
valves or if it requires the installation of only a few new valves. If the chloraminated portion of
the distribution system is connected to the chlorinated portion of the system with only a few
major pipes, rather than a maze of small mains, then the physical separation of the waters would
be an attractive solution.
Caution should be exercised when considering conversion of only a portion of the system
to chloramines. The physical separation of areas of the distribution system may reduce the
reliability of the water supply to some service areas. The separation could lead to reduced
fire-flow capacity and reduced pressure in some areas. The dynamics of water flow may also
change to prevent adequate turnover in storage tanks. Flow reversal might also occur and could
lead to water quality problems.
Option 2
The second option is more appropriate if the consecutive system desires reduction of
DBP levels throughout its distribution system. Depending on the wholesale system-consecutive
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-13
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
system interconnections, converting the entire distribution system to chloramines might
minimize the hydraulic separation issues. It may also prevent potential water quality problems
that would have resulted had the chlorinated and chloraminated water blended in the consecutive
distribution system due to valve failure between pressure zones. Conversion of the entire
distribution system from free chlorine to chloramines will require larger or additional ammonia
and chlorine storage and feed systems. The ammonia feed system would have to be installed at
the point-of-entry to the consecutive system such that the chlorine is converted to chloramines
prior to entering the distribution system. Systems should consider installing backflow prevention
devices or other control features at the interconnections between the wholesaler and consecutive
systems to ensure that chloraminated water from the consecutive system does not backflow into
the wholesaler's system and mix with the wholesaler's chlorinated water.
Prior to conversion of all or a portion of the consecutive system to chloramines, the
consecutive system should contact the State to determine what additional operational or other
requirements apply. Many consecutive systems may not employ certified water treatment plant
operators. Depending on the State, the addition of chemical feed facilities may constitute
treatment and require the system to employ full- or part-time certified water treatment plant
operators.
4.4.3 Cost, Handling, and Safety Issues
Conversion of chlorinated water to chloraminated water requires the addition of
ammonia. Ammonia can be added in the form of anhydrous ammonia, aqueous ammonia, or
ammonium sulfate. Each system needs to determine the most appropriate type of chemical to
use by evaluating factors such as chemical cost, safety, storage requirements, and ease of
handling. Ammonia costs in the United States vary considerably. Anhydrous ammonia is
generally the least expensive option, followed by aqueous ammonia, and then ammonium
sulfate. Considerations related to the use of these chemicals are discussed in Optimizing
Chloramine Treatment, First and Second Editions (Kirmeyer et al., 1993 and 2004).
The chemical feed systems for chlorine and ammonia must be capable of injecting the
prescribed chemical doses into the water. Accurate feed control is necessary to ensure that a
consistent desired chlorine to ammonia ratio (generally in the range of 4.5:1 to 5:1) is
maintained. Immediate adjustments to chlorine or ammonia feed rates are necessary in response
to changes in flow rates or other variables. These adjustments can be made automatically with
feedback systems such as flow pacing or compound loop control. In a flow pacing system, the
dose depends on the flow rate, which can be measured by a flow meter. This type of feed control
can work if the chlorine residual entering the consecutive system is consistent. When both the
flow rate and the chlorine residual vary, a compound loop control system is needed to adjust the
chemical doses based on the flow rate and the chlorine residual. In this case, a flow meter
measures the flow rate and a chlorine analyzer measures the chlorine residual, and both signals
are sent to a controller. The controller integrates the two signals and sends a signal to adjust the
chemical doses. Many variations of the compound loop control system are available
commercially.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-14
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
4.4.4 Public Education
Before converting from free chlorine to chloramines as the secondary disinfectant,
customer concerns should be addressed through public education and notification. Customer
concerns generally fall into one of two categories:
•	Human health concerns. Chloramines are toxic to kidney dialysis patients. Each
hospital and dialysis treatment center should be advised before a conversion is made
so they can provide adequate testing and treatment.
•	Miscellaneous household concerns. Chloramines (and chlorine) are generally toxic to
fish, so homeowners, pet stores, and related businesses should be contacted.
Each PWS should prepare a public education plan prior to a conversion to chloramines.
Public education information, including examples of public education materials, can be obtained
from A Guide for the Implementation and Use of Chloramines (Harms and Owen, 2004). PWSs
may also want to add relevant language to their CCRs to keep customers advised of the presence
of chloramines in their drinking water.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
4-15
Draft for Discussion
Do not Quote. Do not Cite

-------
1

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
5.0 Other Alternatives for Consecutive Systems
The BAT options identified by the Stage 2 DBPR for consecutive systems to reduce DBP
levels are presented in Chapter 4. This chapter presents some of the other alternatives available
for consecutive systems to reduce distribution system DBPs and achieve compliance with the
requirements of the Stage 2 DBPR. The alternatives discussed in this chapter are (1) improving
water quality from a wholesale system by methods such as treatment changes, reducing hydraulic
residence time, and booster disinfection; and (2) finding alternative sources of water with higher
quality and blending with wholesaler's water either at the treatment plant or in the distribution
system. This chapter is divided as follows:
5.1	Improved Water Quality from the Wholesale System
5.2	Alternative Sources and Blending Strategies
5.1 Improved Water Quality from the Wholesale System
The finished water leaving a wholesale system's treatment plant can spend a considerable
amount of time in the distribution system pipes before reaching a consecutive system. High
hydraulic residence time combined with a sufficient disinfectant dose to maintain adequate
disinfectant residual throughout the distribution systems can lead to high DBP formation in the
consecutive system. For a consecutive system that uses free chlorine for secondary disinfection,
the increase in DBP concentrations in the distribution system may be significant. If a
consecutive system is unable to effectively reduce DBPs in its system because of the levels in the
purchased water, the consecutive system should consider discussing control strategies with the
wholesale system. Refer to Chapter 6 for additional information about communicating with the
wholesale system.
Some DBP control strategies that a wholesale system can implement include:
•	Achieving better DBP precursor removal at the treatment plant by optimizing
coagulation and/or clarification processes, or by adding a new treatment step such as
GAC filtration or nanofiltration.
•	Moving the point of primary disinfectant addition downstream after removal of more
DBP precursors.
•	Using an alternative primary disinfectant (e.g. ozone, chlorine dioxide) and/or
secondary disinfectant.
•	Reducing disinfectant demand.
•	Reducing disinfectant dose.
•	Reducing the hydraulic residence time between the wholesale system's treatment
plant and the consecutive system.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
5-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
Chapter 4 discusses options to reduce water age in greater detail. More information on
these DBP control strategies can also be found in the following sources:
•	Stage 2 DBPR Operational Evaluation Guidance Manual (USEPA, N.d.)
•	Enhanced Coagulation and Enhanced Precipitative Softening Guidance Manual
(USEPA, 1999b)
•	Simultaneous Compliance Guidance Manual for the Long Term 2 and Stage 2 DBP
Rules (USEPA, 2007a)
If it is not feasible for the wholesale system to implement some of the DBP control
strategies identified above, then the use of booster disinfection systems can help reduce DBP
levels. Booster disinfection systems could be installed in areas within the wholesale or
consecutive system where it is difficult to maintain disinfectant residuals, thereby allowing the
wholesale system to reduce the disinfectant residual leaving the treatment plant. Optimizing the
location and operation of booster disinfection facilities in the distribution system is important to
obtain desired results. The results from hydraulic models, disinfectant residual data, disinfectant
decay data, and other water quality data are needed to determine appropriate booster disinfection
locations.
The advantages of using booster disinfection facilities include:
•	Increasing the disinfectant residual only in areas that require it without increasing the
disinfectant residual in other parts of the system beyond acceptable levels.
•	Maintaining a more consistent disinfectant residual throughout the distribution
system.
•	Reducing the disinfectant dose and DBP formation at the treatment plant and prior to
the point of booster disinfectant addition.
The disadvantages of using booster disinfection facilities include:
•	Difficulty in controlling the required disinfectant dose at multiple booster stations due
to the dynamic nature of chlorine demand in the system.
•	Regulatory concern with the degradation byproducts if hypochlorite is used or safety
issues if chlorine gas is used.
•	Booster operation in chloraminated distribution systems can be challenging.
For a chlorinated system, the primary controlling factor for chlorine dose is the difference
between the measured and desired free chlorine residual. For the chlorine and ammonia dose in
a chloraminated system, there are other controlling factors besides the difference between the
measured and desired total chlorine residual, such as excess free ammonia in the system due to
chloramine decay. It is important to note that while booster disinfection can lead to lower DBP
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
5-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
concentrations entering the consecutive system, it may do little to reduce DBP concentrations at
the extremities of the distribution system, particularly where water age is excessive.
5.2 Alternative Sources and Blending Strategies
A consecutive system may consider the use of an alternative water source with higher
quality for reducing high DBP levels in the system. If high DBP levels in a consecutive system
are due to the wholesaler's use of a surface water supply, then the consecutive system can
consider using a new groundwater source or increase the use of an existing groundwater source
(if available) to supplement the surface water supply from the wholesaler. Groundwater tends to
have lower TOC concentrations than surface water and is also less subject to rapid fluctuations in
TOC levels that may occur with surface water during periods of heavy runoff. Lower TOC
levels can significantly reduce DBP formation at the treatment plant, and for systems that use
free chlorine for secondary disinfection, the DBP reduction may also be significant in the
distribution system. During the summer, groundwater has lower temperatures than surface
water. If a disinfectant is added at the treatment plant shortly after groundwater is withdrawn
from the ground, then lower temperatures can reduce DBP formation at the treatment plant.
Increasing groundwater use or finding new groundwater sources may be difficult because
excessive groundwater withdrawal can reduce the groundwater table below desirable levels.
This may result in degraded groundwater quality and may affect stream flow levels. Sustainable
use of groundwater as an alternative source will require careful planning to allow adequate time
for groundwater recharge.
Another option for a consecutive system to reduce high DBP levels is to obtain an
alternative water source by purchasing water from another adjacent utility if the utility can offer
higher quality water. This option may be economically feasible if the water supply from the
other utility is in close proximity to the consecutive system. Generally, when the availability of
higher quality water is limited, the consecutive system may deliver the higher quality water only
to parts of the distribution system that have high DBP levels. Interconnections between the two
systems, and new pipelines, valves, and pumps may be required to deliver the higher quality
water to the desired areas.
When two or more alternative water sources are mixed, the final characteristics of the
blended water depends on the water quality characteristics of the individual sources and the
blending ratios. For DBP control, the primary water quality characteristics of concern are the
types and concentrations of disinfectants and DBP precursor concentrations (such as TOC)
present in each source. In many cases, blending may minimize the formation of high DBP
levels, but other water quality problems may actually increase. Therefore, other water quality
characteristics such as corrosion potential, pH, taste, loss of disinfectant residual, and hardness
also need to be considered. Examples of water quality problems due to improper blending ratios
of alternative sources include:
•	Loss of disinfectant residual when blending chlorinated and chloraminated water;
•	Increases in taste and odor;
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
5-3
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
•	Increased corrosivity or increased calcium carbonate precipitation due to changes in
pH, alkalinity, and hardness;
•	Iron and manganese precipitation due to water in a reduced state (groundwater)
mixing with water in a higher oxidized state (surface water); and
•	Continual changes in chemical reactions between pipe walls and blended water due to
intermittent flow reversals when the mixing zone of alternative water sources moves
in relation to variable water demands in the system.
Systems considering blending or making changes to their blending ratios should consider
first performing a blending analysis to determine the effects of blending the different water
sources. Blending analyses can be performed with hydraulic models, water quality models, or
bench scale tests. Hydraulic modeling can be used to predict the areas of the system primarily
supplied by each source and the areas where mixing of two or more sources takes place. Mixing
zones and the relative contribution of each source at a given location can be predicted. The
changes in the locations of mixing zones due to varying water demands can also be predicted.
Water quality modeling can be used to predict water age, disinfectant residual, and DBP levels.
Even if changes in water quality can be predicted from water quality models and spreadsheets,
water quality monitoring is necessary to verify the effects of blending.
It is generally easier to blend alternative sources before they enter the distribution system,
especially if the blended water can be treated to the desired quality. However, if a wholesale
system's treatment plant is far from the alternative water source, and the high DBP areas of a
consecutive system are in close proximity to the alternative source, then it may be more feasible
to introduce the alternative source to the affected part of the system directly through
interconnections.
If water quality problems arise when water is blended in the distribution system, systems
may consider physical or hydraulic separation of the different waters in the distribution system
using valves and additional piping. The physical separation of portions of a distribution system
may reduce water supply reliability, fire-flow capacity, and pressure in some areas. Detailed
distribution system studies are helpful to determine the impacts of physical separation.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
5-4
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
6.0 Communication Strategies for Consecutive and Wholesale Systems
Consecutive systems and wholesale/consecutive system interactions and contractual
relationships can be complex. To improve compliance with the requirements of the Stage 2
DBPR, consecutive systems can utilize effective communication strategies with the wholesale
system. It is important to establish a communication process for the consecutive systems to be
aware of water quality and operational issues in the wholesale systems. Communication
approaches could include:
•	Dedicated phone lines with afterhours forwarding or recorded message capacity;
•	Web-based information pages and message posting;
•	Pager and cell phone message transmission;
•	E-mail notification; and
•	Laboratory notification to both the consecutive and wholesale system.
For information on communication strategies for IDSEs, refer to Appendix A of the Stage 2
DBPR Initial Distribution System Evaluation Guidance Manual (USEPA, 2006).
This chapter is organized as follows:
6.1	Communication Strategies for Stage 2 DBPR Compliance Monitoring
6.2	Communication Strategies for Operational Evaluations
6.3	Agreements Between Consecutive and Wholesale Systems
6.1 Communication Strategies for Stage 2 DBPR Compliance Monitoring
This section provides recommended communication strategies for consecutive and
wholesale systems related to Stage 2 DBPR compliance monitoring. Stage 2 DBPR compliance
monitoring requirements for consecutive systems vary by source water type and system size.
Chapter 3 discusses Stage 2 DBPR compliance monitoring requirements in greater detail.
Before beginning Stage 2 DBPR compliance monitoring, each system must prepare a
subpart V monitoring plan. Consecutive and wholesale systems should work together to
coordinate their Stage 2 DBPR compliance monitoring schedules and should provide copies of
their final subpart V monitoring plans to one another. It is not necessary for each consecutive
system in a combined distribution system to provide copies of their monitoring plans to each
other, but each consecutive system should provide a copy to the wholesale system, and each
consecutive system should request a copy of the wholesale system's monitoring plan. Where a
consecutive system receives water through another consecutive system, the second consecutive
system should request a copy of both the first consecutive system's and the wholesale system's
monitoring plan.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Although not required by the Stage 2 DBPR, coordination of compliance monitoring will
allow both the wholesale and consecutive system to better understand DBP formation across the
combined distribution system and help to formulate an appropriate compliance strategy, when
necessary. Similarly, coordinating sampling schedules will better enable wholesale and
consecutive systems to identify changes in source, treatment, or operation that impact DBP
formation in the distribution system. More specifically, coordination of Stage 2 DBPR
compliance monitoring schedules will help consecutive and wholesale systems conduct
operational evaluations, when required. Recommended communication strategies for operational
evaluations are discussed in greater detail in Section 6.3.
To coordinate Stage 2 DBPR compliance monitoring for the wholesale and consecutive
systems, their sampling schedules should account for the approximate system water age. For
example, if it takes three or four days for water to pass through the consecutive system, the
consecutive system might consider sampling three or four days after the wholesale system.
When one consecutive system receives water through another consecutive system, the second
system should account for the approximate water age in the first system when scheduling
monitoring. Exhibits 6.1 and 6.2 show these concepts graphically. Exhibit 6.3 shows an
example where a consecutive system receives water from a wholesale system transmission main
with a known approximate water age. If approximate water ages at individual sample locations
are known more precisely, the consecutive system may schedule monitoring at those locations
based on individual location water ages. An example of this approach is provided in Exhibit 6.4.
Again, the Stage 2 DBPR does not require wholesale and consecutive systems to coordinate
monitoring schedules, and it does not require that monitoring schedules account for water age
differences between wholesale and consecutive systems. In fact, in complex distribution systems
and systems with limited understanding of hydraulic patterns and water age, such an approach
can be difficult to implement. Also, this monitoring approach presented in Exhibit 6.4 may
result in higher sampling costs since the consecutive system would be sampling on multiple
days.
Exhibit 6.1 Coordinating Stage 2 DBPR Compliance Monitoring Schedules -
Consecutive System Receiving Water Directly from Wholesale System
Wholesc
Monito
1
lie System Consecul
ring Date Monito
r i
tive System
ring Date
r
WTP
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
V
Typical Consecutive System
Water Age
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Exhibit 6.2 Coordinating Stage 2 DBPR Compliance Monitoring Schedules -
Consecutive System Receiving Water Through Another Consecutive System
Wholesale
Monitorir
System Consecutiv
lg Date Monitor
r i
e System 1 Consecuti
ng Date Monito
r ^
ve System 2
ring Date
r
WTP
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
V	v	*	v	'
Typical Consecutive Typical Consecutive
System 1 Water Age System 2 Water Age
Exhibit 6.3 Coordinating Stage 2 DBPR Compliance Monitoring Schedules -
Consecutive System Receiving Water from Wholesale System with No Customers
Consecu
Monito
tive System
ring Date
r
WTP
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
K	v	^	v	'
Typical Water Age in Wholesale Typical Consecutive
System Transmission Main System Water Age
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-3
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Exhibit 6.4 Coordinating Stage 2 DBPR Compliance Monitoring Schedules -
Approximate Water Age of Monitoring Locations is Known
GonsecutiveSystem Monitors
Average Residence imeLocsions
Wholesale System

GonsecutweSptem Itortiore
Ugh HAA5 Locations
ConsaotifS 9ystont Monitors
High TTHtf Locations

ftppfCfcimafc Vwlltf &
AvtfiSQi Resi dsn ci Tiin# I Locations
ji§8 at
HitftHMSLwalMS

Appraaratt VUttof Ag® at
Hltfl TTHMLTOl«s
Consecutive and wholesale systems should share compliance monitoring data with each
other as results are gathered. This will help all parties understand their status relative to Stage 2
DBPR compliance and, hopefully, prevent future surprises in the form of elevated DBP
concentrations or LRAAs near the MCLs. Consecutive systems are also encouraged to ask the
wholesale system to notify them in the event of any source, treatment, or operational upsets that
might impact DBP formation. Similarly, consecutive systems should notify the wholesale
system immediately if they encounter unusual water quality data (e.g., changes in chlorine
residual or DBP concentrations).
6.2 Communication Strategies for Operational Evaluations
This section discusses how communication between consecutive and wholesale systems
can be enhanced to either prevent or, when necessary, conduct an operational evaluation. As
described in Chapter 3, consecutive systems and wholesale systems are required to conduct an
operational evaluation when a routine DBP sample result, if repeated, would result in an
exceedance of either the TTHM or HAA5 MCL. For example, the TTHM concentrations for the
past four quarters at one of a utility's Stage 2 DBPR monitoring locations are 0.055, 0.065, 0.07,
and 0.095 mg/L (LRAA = 0.071 mg/L). The 0.095 mg/L concentration will trigger an
operational evaluation, since a repeat value of 0.095 mg/L, resulting in values of 0.065, 0.07,
0.095 and 0.095 mg/L (LRAA = 0.081 mg/L), would result in an exceedance of the TTHM MCL
at this location. The Stage 2 DBPR Operational Evaluation Guidance Manual (USEPA, N.d.)
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-4
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
provides much greater detail regarding identification of an operational evaluation level
exceedance and conducting an operational evaluation.
For consecutive systems, conducting an operational evaluation requires communication
with the wholesale provider. Where water is received through another consecutive system,
communication between consecutive systems may also be necessary. The wholesale system is
most likely to have data regarding source and finished water TOC, disinfectant residual, pH,
temperature, and other water quality parameters that impact distribution system DBP
concentrations. Further, a comparison of wholesale and consecutive system DBP concentrations
may help to identify the cause of the operational evaluation level exceedance. For example, if
finished water quality was normal and wholesale system DBP concentrations were in their
expected range, the cause of the operational evaluation level exceedance might be attributed to
distribution system operations in the consecutive system (e.g., reduced demand contributing to
higher water age).
The need for communication between consecutive and wholesale systems when
conducting an operational evaluation also underscores the value of coordinating Stage 2 DBPR
compliance monitoring schedules. While finished water quality (e.g., TOC, temperature, etc.)
may help to identify the cause of an operational evaluation level exceedance, a comparison of
consecutive and wholesale system DBP concentrations may also be helpful in terms of how DBP
levels change as water moves further from the treated water source.
6.3 Agreements between Consecutive and Wholesale Systems
Agreements between consecutive and wholesale systems, both formal and informal, can
significantly improve coordination between consecutive and wholesale systems. These
agreements establish lines of communication and assign responsibility for water quality in each
of the systems. Such agreements can help to create cooperative, working relationships where no
prior relationship exists. Where prior relationships exist, such agreements can clarify or enhance
existing relationships. In either case, the agreement represents a commitment to protect public
health by both the consecutive and wholesale system. Exhibits 6.5 and 6.6 provide case studies
of formal and informal agreements, respectively.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-5
Draft for Discussion
Do not Quote. Do not Cite

-------
1	Exhibit 6.5 Case Study of Formal Agreements between Consecutive and
2	Wholesale Systems
3		
Denver Water Department in Colorado serves more than 1 million customers in the City
of Denver, Denver County, and surrounding suburban areas. This includes nearly 80 water
service contracts with consecutive systems. Under the Colorado Department of Public Health
and Environment provisions for integrated systems, Denver Water has executed formal
agreements with each of these consecutive systems. Under these agreements, Denver Water
assumes responsibility for all regulatory compliance monitoring and sample analysis. However,
the consecutive system is responsible for maintaining compliance with regulatory requirements.
The Denver system is very complex. In some cases, water passes from one consecutive
system to another. In other cases, water may pass through a consecutive system and return to
Denver's distribution system. As previously mentioned, Denver has assumed responsibility for
all compliance monitoring under their service contracts. The consecutive systems are
responsible for meeting all of Denver Water's operating requirements and engineering standards
These requirements dictate that the consecutive systems essentially operate in the same manner
as Denver Water, including flushing, storage tank cleaning, backflow prevention, and utilization
of certified operators.
Source: Lohman, Steve < 303.628.6000, Manager of Water Quality at Denver Water
Departments 2007. Phone Call With Chris Hill of Malcolm Pirnie, Inc. 813.242.7204.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-6
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
Exhibit 6.6 Case Study of Informal Agreements between Consecutive and
Wholesale Systems
The Cobb County-Marietta Water Authority (the Authority) provides water to 13
consecutive systems in northwestern metropolitan Atlanta, Georgia. These systems include
municipal and county water systems, as well as one industrial and one institutional customer. Of
these customers, nine are sole-source customers buying their water only from the Authority. The
Authority provides water service to its consecutive systems under long-term service contracts up
to 50 years in length. These contracts stipulate that the Authority will provide the customer with
water at mutually agreeable locations (connections). The contracts include no mention of water
quality.
The Authority has no retail customers of its own, and has no contractual obligation other
than to "provide water" to its consecutive systems. The contracts also make no mention of sales
volume.
The Georgia Environmental Protection Division (EPD) has worked with the Authority
and its sole source customers to address water quality on a rule-by-rule basis. The Total
Coliform Rule is addressed by each consecutive system individually. The Lead and Copper Rule
is administered to the Authority and its sole source customers as a single entity. Under this
approach, if one system violates an MCL, then every consecutive system must respond as
directed by EPD. A consecutive system can unilaterally withdraw from this arrangement, but
must then conduct the monitoring and reporting to EPD individually. The Authority staff meets
regularly with its consecutive systems to discuss and address water quality and regulatory issues,
and all parties are involved in a cooperative working relationship.
For the Stage 1 DBPR, the Authority and its sole-source customers are considered by the
Georgia EPD as a combined distribution system. EPD worked with the Authority in developing
the combined system DBP monitoring plan. Under this arrangement, the Authority has
responsibility for all DBP monitoring in the combined sole-source distribution system.
In preparation for the IDSE required under the Stage 2 DBPR, the Authority and its
sole-source customers jointly conducted a fluoride tracer study to determine the areas of oldest
water in the system. The information gathered under this study was used individually by the
consecutive systems to develop their IDSE monitoring plans.
Source: Parsons, James < 770.426.8788 Director of Engineering, Cobb County-Marietta Water
Authority>. 2005. June 9, 2005.
3
4
5
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-7
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
The Colorado Department of Public Health and Environment (the Department) has
established requirements for integrated systems - which consider the consecutive and wholesale
systems as a single regulated entity (5 Colorado Code of Regulations 1003-1). The Department
requires that the wholesale and consecutive systems included in the integrated system execute a
"...contract, memorandum of agreement, or other enforceable mechanism." The application for
consideration as an integrated system includes the following:
•	A contact person, address, and phone number for each participating system, and each
regulatory requirement for which an integrated system is being created.
•	The number of persons served by the wholesale and each consecutive system and
whether the consecutive system is providing further disinfection.
•	A map showing the supply system and each consecutive system including the relevant
elements of the distribution system such as meters, piping, pump stations, storage
tanks, and finished water reservoirs.
•	A sampling plan for each regulatory provision covered by the integrated system (e.g.,
DBPs or disinfectant residual monitoring). The sampling plan shall meet all of the
requirements of the respective provision and shall also identify the responsibilities of
each party.
•	A copy of each agreement between the consecutive and wholesale systems, including
a common set of operations and maintenance standards that the wholesale system has
established for each regulatory requirement for which an integrated system is being
created.
•	A statement that clearly assigns legal responsibility to one of the participating
systems for compliance with each individual regulatory provision in the integrated
system.
An example of a formal agreement meeting the requirements of the State of Colorado is
provided in Appendix A. Other States may have specific requirements that must be met in
preparing these agreements. Water systems should contact their State to determine how specific
requirements apply to wholesale and consecutive systems.
Regularly scheduled communication between consecutive and wholesale systems can be
an effective tool for managing water quality. Weekly, biweekly, monthly, or even quarterly
meetings between a consecutive system and its wholesale provider are an appropriate forum to
discuss and address water quality concerns. Where multiple consecutive systems purchase water
from a wholesale system, meetings that involve all of the consecutive systems in the combined
distribution system are recommended.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
6-8
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
7.0 Developing Consecutive System Compliance Strategies
The Stage 2 DBPR specifically requires consecutive systems to comply with the same
MCLs for DBPs as wholesale systems and extends the disinfectant residual and MRDL
requirements of the Stage 1 DBPR to consecutive systems. Chapter 3 discusses these
requirements and their impacts on consecutive systems in greater detail. This chapter discusses a
methodology that can be employed by consecutive systems to develop a compliance strategy to
meet these requirements. It discusses the use of water quality monitoring data to identify
potential compliance issues and develop, in concert with the wholesale system, effective
compliance strategies. This chapter is organized into the following sections:
7.1	Data Acquisition
7.2	Communication of Needs to the Wholesale System
7.1 Data Acquisition
As part of normal system operations or as required by drinking water regulations,
consecutive systems should routinely monitor distribution system water quality. Parameters such
as DBP concentrations (TTHM and HAA5), pH, temperature, disinfectant residual (free chlorine,
total chlorine, or chloramine),TOC and microbiological parameters (total and fecal coliform,
HPC), can be used to characterize distribution system water quality and can be extremely useful
in developing a compliance strategy. A historical record of water quality data combined with
new data can be particularly useful in isolating and identifying DBP-related issues in the
distribution system. The remainder of this section discusses: 1) what parameters a consecutive
system might find useful in developing a compliance strategy; 2) when to monitor; and 3) where
to monitor. The importance of these routine water quality parameters and their relation to overall
DBP formation are further discussed below.
7.1.1 Monitoring Parameters
TTHM and HAAS
Routine monitoring of TTHM and HAA5 throughout the consecutive system will likely
be the most useful tool in determining if compliance with the Stage 2 DBPR will be a concern.
Routine TTHM and HAA5 monitoring will also help to determine the requirements necessary to
achieve compliance. A comparison of DBP concentrations entering the system to concentrations
throughout the distribution system will help to determine if the DBP concentrations entering the
consecutive system are too high to achieve compliance with the Stage 2 DBPR, or if the
consecutive system is able to employ some strategy to achieve compliance. High DBP locations
may need further monitoring and evaluation because they will likely correspond with longer
residence time, lower disinfectant residuals, and higher bioactivity. Some of the strategies a
consecutive system can implement to control DBP levels in the distribution system include water
age management, using alternative disinfectants such as chloramine, managing the chlorine
dosages effectively to avoid under- or over-dosing, blending with sources that have low DBP
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
7-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
precursor levels, and/or purchasing water from a different wholesaler. These strategies are
discussed in more detail in Chapters 4 and 5.
pH and Temperature
Water quality parameters such as pH and temperature can also be used to identify
seasonal trends and irregularities in distribution system water quality. Seasonal variations in
water temperature can affect DBP formation in the distribution system. For instance, higher
temperatures increase the reaction rate of DBP formation. Warmer water temperatures will
produce higher levels of TTHM and HAA5 unless better removal of precursors is achieved
during treatment, alternative disinfection is practiced, or other DBP-minimizing strategies are
implemented.
Disinfectant Residual Data
Disinfectant residual data should be routinely gathered and monitored throughout the
distribution system. A measurable disinfectant residual should be maintained throughout the
distribution system, as required by the SWTR, to provide adequate protection against the
possible entry of pathogens or untreated water, and to maintain the microbial water quality
achieved by primary disinfection.
A low disinfectant residual at consecutive system entry points may indicate increased
water age in the wholesale system. However, accumulation of sediments in a pipe, corrosion
conditions, biofilm growth, pipe materials, and the pipe lining in either system can also
contribute to disinfectant demand. Comparing historical data for a particular site may be helpful
in isolating the contributing factors. Strategies to minimize water age are discussed in greater
detail in Chapter 4.
Conversely, excessive disinfectant residual concentrations at the consecutive system
entry point may also contribute to higher DBP concentrations. In some instances, a high residual
entering the system may be necessary for the consecutive system to maintain a residual at the
ends of the system, or may be the result of the wholesale system needing to maintain a residual at
the end of their own system. Strategies to minimize the disinfectant residual dose, such as the
use of enhanced coagulation (which reduces DBP precursor concentrations and disinfectant
demand) by the wholesale system at its water treatment plant, moderation of chlorine residual
levels through strategic placement of booster chlorination stations, or water age management
may help to reduce DBP concentrations in the distribution system.
Microbial Data
Microbial data, such as total and fecal coliforms or HPCs, may be useful in identifying
potential DBP compliance strategies. Low disinfectant residual and increased microbial activity
are most likely to occur at locations with high water age. In such cases, increased disinfectant
doses might be considered necessary to maintain the residual and reduce microbiological
activity. However, increasing the dose may also lead to higher DBP concentrations.
Consequently, a strategy to reduce water age may be more appropriate to prevent increased
formation of DBPs. Chapter 4 discusses operational strategies to reduce system water age.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
7-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
7.1.2 Monitoring Frequency
Consecutive systems should collect routine samples for the various parameters discussed
above at a regular frequency. To the extent possible, consecutive systems may want to
coordinate their monitoring schedule with the wholesale system to provide the most complete
analysis of DBP formation. Coordination of sampling schedules allows for more accurate
interpretation of data, as it is possible to see the change in water as it moves from one system to
the next over the same time period. Coordination of monitoring with the wholesale system is
explained in greater detail in Chapter 6.
Collecting samples at regular frequencies will help you identify short and long term DBP
trends, including seasonal impacts of water quality on distribution system DBP concentrations.
Requirements for many parameters, such as disinfectant residual and DBP concentrations, are
established by the Stage 2 DBPR. Chapter 3 provides a more thorough discussion of consecutive
system monitoring requirements.
7.1.3 Monitoring Locations
Samples should be collected throughout the consecutive system distribution system.
Sample locations should include locations such as the master meter connection, middle of the
distribution system, and near the ends or other areas of the distribution system where the highest
water age and DBP levels are expected. Monitoring at many of these locations is already
required by the Stage 2 DBPR. If additional sites could be incorporated for monitoring,
sampling locations should be spread throughout the distribution system. Samples collected from
only one location or region within the distribution system may skew the DBP, disinfectant
residual, or microbial data. Understanding how DBP formation varies across the entire system is
critical to developing an effective DBP control strategy. Thus, it is important to collect and use
data that represent the entire distribution system.
Exhibits 7.1 and 7.2 provide case studies characterizing the differences in wholesale and
consecutive system DBP formation. These examples show how TTHM, HAA5 and disinfectant
residual concentrations are impacted by differences in disinfection practices from the wholesale
system to the consecutive system.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
7-3
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
I
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Exhibit 7.1 DBP Formation from Wholesale to Consecutive System
25/22/1.0
System A
WTP
41/29/0.8
TTHM/HAA5 / Cl2 Residuals
System B

55/15/0.3
50/27/0.5
System D
System C
Note: WTP = water treatment plant; THMs = trihalomethanes; HAAs = haloacetic acids; CI2 = chlorine.
System A is a wholesale system that provides drinking water to more than 100,000
people. Water is treated using an advanced filtration process followed by disinfection using
chlorine. The finished water then travels through large transmission lines from the water
treatment plant to the distribution system. Finished water is distributed to three consecutive
systems. System A supplies water to System B and System C, and System C supplies water to
System D.
Exhibit 7.1 illustrates the complex nature of wholesale and consecutive system
relationships. This figure shows average TTHM and HAA5 concentrations, and chlorine
residuals in the wholesale and consecutive systems. Only wholesale system A and consecutive
system B practice booster chlorination to maintain chlorine residuals at acceptable levels.
Consecutive systems C and D are smaller systems and do not practice booster chlorination. The
chlorine residual in System A's distribution system averages about 1.0 mg/L. An equal or lower
chlorine residual is observed in the consecutive systems.
The DBP formation as the water travels from the treatment plant to the distribution
systems is also depicted in Exhibit 7.1. Within System A's distribution system, a 40 percent
increase in TTHM and a 25 percent increase in HAA5 occurs because it is a large system with
booster chlorination systems at various locations. Although consecutive system B receives water
directly from the same treatment plant and practices booster chlorination, DBP formation is
lower than that of System A because it is a smaller system with lower overall water age. The
average TTHM level in consecutive system C is 25 percent higher than System A because of a
long transmission main between the two cities. Also, the use of booster chlorination by System
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
7-4
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
A causes TTHM levels to be fairly high in System C. The increase in TTHM levels from
consecutive system C to system D is minimal because these are both small systems with low
water age in close proximity to one another. However, the TTHM levels in the consecutive
systems are still fairly high because of the impact of System A. A small decrease in HAA5
concentration is noted in the consecutive systems due to biodegradation of some HAA5 species
in the distribution system.
Exhibit 7.2 Variation in DBP Formation with Chlorination and Chloramination
70.0
!> 60.0

0
+•>
C
re
o
a
c
¦
Q
50.0
40.0
i 30.0
~	TTHM
¦ HAA5
~	CI2 or NH2CI
u>
3

CL
m
Q
20.0
10.0
0.0
City A
CS of City A
City B
CS of City B
Note: CS = Consecutive System; TTHM = total trihalomethane; HAA5 = sum of five HAA species; CI2 = chlorine;
NH2CI = chloramines.
Exhibit 7.2 compares DBP formation in City A (chlorinated system) and City B
(chloraminated system) which are both large wholesalers. City A uses free chlorine for
secondary disinfection. City B uses chloramine for secondary disinfection and also practices
booster disinfection. Exhibit 7.2 shows the increase in DBP concentrations from the wholesale
to the consecutive system. As would be expected, the overall TTHM and HAA5 concentrations
are significantly higher in City A. However, the increases in TTHM and HAA5 concentrations
between the wholesale and consecutive systems are more significant in City B. That is, the
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
7-5
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
percentage increases in TTHM and HAA5 concentrations are greater in the chloraminated
system than in the chlorinated system. This reflects the fact that while chloramines may result in
lower DBP concentrations, significant growth can still occur in the wholesale or consecutive
system's distribution system. Monitoring can be a effective tool to identify these relationships in
your system. It is worth noting that these results are site/system-specific and may not be typical
of results seen in their system.
7.2 Communication of Needs to the Wholesale System
If the alternative operational strategies discussed in Chapter 4 are not adequate to control
DBPs, consecutive systems should meet with the wholesale system to discuss results and come
to a mutually agreed-upon compliance strategy. Chapter 6 discusses communication strategies
and agreements between consecutive and wholesale systems in greater detail.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
7-6
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
8.0 Frequently Asked Questions
Can I be both a consecutive system and a wholesale system?
Yes. If you sell water and you purchase water, you are both a wholesale system and a
consecutive system.
I buy all of my water. Do I follow the requirements for subpart H systems or ground water
systems?
If you purchase all of your water and any of it is GWUDI, you must follow the requirements for
subpart H systems. If you purchase all of your water and it is all ground water, you should
follow the requirements for ground water systems.
What if my wholesaler only serves groundwater?
If your system does not have any surface water or GWUDI sources and your wholesaler serves
only ground water, you should follow the requirements for ground water systems.
What if I purchase water but I also have my own sources?
If your system purchases water, it is considered a consecutive system even if your system has its
own sources. Your compliance schedule is based on the population of the largest system in the
combined distribution system. However, for purposes of the compliance schedule, the State may
determine that the combined distribution system does not include certain consecutive or
wholesale systems if water is purchased or sold only on an emergency basis or if only a small
percentage and small volume of water is purchased or sold by a system. While your compliance
schedule is based on the population of the largest system, your monitoring requirements are
based on your own retail population.
I have my own ground water wells and buy water from a subpart H system. Do I follow the
requirements for subpart H systems or ground water systems?
If you purchase any surface water or GWUDI, you must follow the requirements for subpart H
systems.
What if I buy water from more than one wholesale system?
If you buy water from more than one wholesale system, you are considered to be part of a
combined distribution system that includes all of your wholesalers, all other systems served by
your wholesalers, and any systems to which you sell water. If your system is part of a combined
distribution system, your compliance schedule is based on the population of the largest system in
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
8-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
the combined distribution system. However, for purposes of the compliance schedule, the State
may determine that the combined distribution system does not include certain consecutive or
wholesale systems if water is purchased or sold only on an emergency basis or if only a small
percentage and small volume of water is purchased or sold by a system. While your compliance
schedule is based on the population of the largest system, your monitoring requirements are
based on your own retail population.
My system has only undisinfected groundwater sources. I only buy disinfected water in July
and August or when my supplies can't meet demand. Do I still have to comply with the Stage
2 DBP Rule?
Yes, your system is still subject to the Stage 2 DBPR but monitoring is only required during the
period when you are buying water. You should contact your State to confirm monitoring
requirements.
Why didn't EPA use § 141.29 for consecutive system monitoring requirements?
The Stage 2 M-DBP Federal Advisory Committee Agreement in Principle that was signed in
September 2000 recommended that the monitoring provisions of the Stage 2 DBPR provide
protection for customers in consecutive systems that is equivalent to that provided in wholesale
systems. EPA concurred with this recommendation and followed this principle in development
of the Stage 2 DBPR.
EPA believes that providing equivalent public health protection in consecutive systems by
assigning appropriate compliance monitoring locations throughout the combined distribution
system requires case-by-case determinations. These determinations should be based on factors
such as the amount and percentage of finished water provided; whether finished water is
provided seasonally, intermittently, or full-time; and improved DBP occurrence information. In
order to provide systems and States with improved DBP occurrence information, the Stage 2
DBPR requires consecutive systems to address IDSE requirements. § 141.29 by itself would not
provide this information. However, since the IDSE will provide improved DBP occurrence
information, States may consider modifications to Stage 2 compliance monitoring requirements
for consecutive systems on a case-by-case basis as allowed by § 141.29 [or under the special
primacy condition at § 142.16(m)(3)] by taking all these factors into consideration. Note that §
141.29 requires case-by-case approval by EPA, but the Stage 2 rule has a special primacy
condition that does not require case-by-case approval. In making these case-by-case
determinations, the State will be able to use its system-specific knowledge, along with the IDSE
results, to develop an appropriate monitoring plan for each system within the combined
distribution system.
What are the minimum monitoring requirements for combined distribution systems if the
State modifies monitoring?
For combined distribution systems for which the State modifies monitoring requirements, the
minimum number of Stage 2 DBPR monitoring sites and monitoring frequency will be based on
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
8-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
the total population of the combined distribution system. In addition, each consecutive or
wholesale system must have at least one compliance monitoring location. Also, each wholesale
or consecutive system must conduct its own IDSE. The schedule for your IDSE was based on
the population of the largest system in the combined distribution system. The rest of your IDSE
requirements were based on your individual system's population. You cannot conduct one IDSE
for the entire combined distribution system.
Why can't my consecutive system forego DBP monitoring and base my compliance status on
my wholesaler's compliance status?
Your consecutive system may not base your compliance status on your wholesaler's compliance
status because DBPs will continue to form in your consecutive system and may be significantly
higher than in your wholesaler's system. Therefore, DBP levels in your consecutive system may
exceed the MCL even though your wholesaler is in compliance. Conversely, your DBP levels
may be lower than the wholesale system's DBP levels and you should not be in violation if the
wholesale system exceeds the MCL. EPA believes that distribution systems and DBP formation
are too complex to base compliance determinations on another system's compliance monitoring
results.
Do I have to monitor at the same time as my wholesale system?
You are not required to monitor at the same time as your wholesaler. However, you may wish to
coordinate your monitoring schedule with your wholesaler to better understand DBP formation
in your combined distribution system. See Chapter 6 of this guidance manual for details.
If my wholesaler has a TTHM or HAA5 violation, is my consecutive system in violation?
Your consecutive system is only in violation if TTHM or HAA5 levels in your distribution
system exceed the MCL. However, your State may require additional follow-up monitoring or
public notification if your wholesaler has a TTHM or HAA5 violation. If you receive water
from the area of your wholesaler's system where the TTHM or HAA5 violation occurred, you
may also detect TTHM or HAA5 levels above the MCL in your consecutive system.
If the lab with whom I have a contract does not collect DBP samples, am I in violation? What
if my contract is with my wholesale system?
Even if you have a contract with your laboratory or your wholesale system, you retain
responsibility for the collection of DBP samples. If your laboratory or wholesale system fails to
collect your DBP samples, your system will incur a violation.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
8-3
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Can I use my wholesale system's system-specific study or DBP data instead of monitoring my
own system?
Each wholesale or consecutive system must conduct its own IDSE. The schedule for your IDSE
must be based on the population of the largest system in the combined distribution system. The
rest of your IDSE requirements must be based on your individual system's population. You
cannot conduct one IDSE for the entire combined distribution system.
What if my wholesaler will not be conducting the monitoring in my consecutive system?
As a public water system, you are responsible for ensuring that your monitoring is conducted. If
your wholesaler will not be conducting monitoring in your consecutive system and you do not
have a contract with a laboratory to conduct monitoring in your system, you are responsible for
collecting all of your compliance samples in your system, and ensuring that the samples are
analyzed in a certified laboratory.
How do consecutive systems qualify for reduced monitoring?
There are no differences in how consecutive and non-consecutive systems qualify for reduced
monitoring. Consecutive systems qualify for reduced monitoring if the LRAA is less than or
equal to 0.040 mg/L for TTHM and less than or equal to 0.030 mg/L for HAA5 at all compliance
monitoring locations. In addition, before any treatment, the source water average annual TOC
level must be less than or equal to 4.0 mg/L at each treatment plant treating surface water or
GWUDI, based on monitoring conducted under the Stage 1 DBPR. Consecutive systems will
need to obtain source water TOC monitoring results from all surface water and GWUDI sources
used by their wholesaler(s) in addition to their own sources to qualify.
How is compliance determined for a consecutive system?
A consecutive system's compliance is based on the LRAA calculated using the sample results
collected only in that system's distribution system. However, the State may require the
consecutive system to give public notice if the wholesaler has a violation, even if the consecutive
system does not incur a violation.
If my consecutive system is in danger of exceeding the TTHM or HAA5 MCLs, who is
responsible for making changes to ensure compliance with the MCLs?
Even though some agreements between wholesale and consecutive systems may indicate that the
wholesale system is responsible for making changes, you are ultimately responsible for
providing water that meets the MCLs within your consecutive system. You should consider
discussing treatment changes with your wholesaler to reduce DBP levels prior to your entry
point. See Chapter 5 for more information. However, if your wholesaler is in compliance with
the MCLs, your wholesaler is not required by the Stage 2 DBPR to make any treatment changes
to meet the MCLs in your consecutive system. Therefore, you should also consider changes to
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
8-4
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
your distribution system to reduce DBP levels. See Chapter 4 for more information. If you are
still unable to meet the MCLs, you should consider an alternate source of water or blending
sources. See Chapter 5 for more information.
What if my wholesaler will not be making treatment changes to meet the Stage 2 DBPR?
If your system is in danger of exceeding the MCLs for TTHM or HAA5 and your wholesaler
will not be making treatment changes to meet the Stage 2 DBPR, you should consider making
distribution system changes to reduce DBP levels. Refer to Chapter 4 for more information. If
you are still unable to meet the MCLs, you should consider alternate sources of water or
blending sources. See Chapter 5 for more information.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
8-5
Draft for Discussion
Do not Quote. Do not Cite

-------
1

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
9.0 References
American Water Works Association (A WW A). 2005a. Fundamentals and Control of
Nitrification in Drinking Water Distribution Systems. Denver: AWWA.
AWWA. 2005b. Managing Change and Unintended Consequences: Lead and Copper Rule
Corrosion Control Treatment. Denver: AWWA.
Boulos, P.F., K. E. Lansey, B.W. Karney. 2006. Comprehensive Water Distribution Systems
Analysis Handbook. Denver: AWWA.
Chowdhury, Z.K., C.P. Hill, M.J. Sclimenti, S.W. Krasner, R.S. Summers, C. Valenti, and J.G.
Uber. N.d. Evaluation of Disinfection Practices for DBP and Precursor Occurrence in
Distribution Systems. On-going American Water Works Association Research Foundation
(AwwaRF) Project No. 3026. Project status reports available online at:
http://www.awwarf.org/research/TopicsAndProiects/proiectSnapshot.aspx?pn=3026. Final
report to be published in 2008.
Friedman, M.J., K. Martel, A. Hill, D. Holt, S. Smith, T. Ta, C. Sherwin, D. Hiltebrand, P.
Pommerenk, Z. Hinedi, and A. Camper. 2003. Establishing Site-Specific Flushing Velocities.
Denver: AwwaRF.
Grayman, W. M., L. A. Rossman, C. Arnold, R. A. Deininger, C. Smith, J. F. Smith, and R.
Schnipke. 2000. Water Quality Modeling of Distribution System Storage Facilities. Denver:
AwwaRF.
Harms, L. L., and C. Owen. 2004. A Guide for the Implementation and Use of Chloramines.
Denver: AwwaRF.
Harrington, G. W., D. R. Noguera, C. C. Bone, A. I. Kandou, P. S. Oldenburg, J. M. Regan, and
D. V. Hoven. 2003. Ammonia From Chloramine Decay: Effects on Distribution System
Nitrification. Denver: AwwaRF.
Joseph, S. and J. G. Pimblett. 2000. Flushed with Success - Unidirectional Flushing Program is
Clean Sweep. AWWA Opflow, Vol.26, No. 1.
Kirmeyer, G.J., G.W. Foust, G.L. Pierson, J.J. Simmler, M.W. LeChevallier. 1993. Optimizing
Chloramine Treatment. First Edition. Denver: AwwaRF and AWWA.
Kirmeyer, G.J., M. Friedman, J. Clement, A. Sandvig, P.F. Noran, K.D. Martel, D. Smith, M.
LeChevallier, C. Volk, E. Antoun, D. Hiltebrand, J. Dykesen, and R. Cushing. 2000. Guidance
Manual for Maintaining Distribution System Water Quality. AwwaRF Report 90798. Project
#357. Denver: AwwaRF.
Kirmeyer, G.J., L. Kirby, B.M. Murphy, P.F. Noran, K. Martel, T.W. Lund, J.L. Anderson, and R.
Medhurst. 1999. Maintaining and Operating Finished Water Storage Facilities to Prevent Water
Quality Deterioration. Denver: AwwaRF and AWWA.
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
9-1
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Kirmeyer G., Martel K., Thompson G., Radder L., Klement W., LeChevallier M., Baribeau H.,
Flores A. 2004. Optimizing Chloramine Treatment, Second Edition. Denver: AwwaRF.
Mahmood, F., Pimblett J. G., Grace N. O., and Grayman W. M. 2005. Evaluation of Water
Mixing Characteristics in Distribution System Storage Tanks. JournalAWWA, 97:3:74-88.
USEPA. N.d. Stage 2 Disinfectants and Disinfection Byproducts Rule Operational Evaluation
Guidance Manual (Draft for Public Comment, September). Washington, D.C: USEPA.
USEPA. 2007a. Simultaneous Compliance Guidance Manual for the Long Term 2 and Stage 2
DBP Rules. EPA 815-R-07-017. Available at:
http://www.epa.gov/safewater/disinfection/stage2/pdfs/guide st2 pws simultaneous-
compliance.pdf
USEPA. 2007b. The Stage 2 Disinfectants and Disinfection Byproducts Rule Implementation
Guidance. EPA 816-R-07-007. Available at:
http://www.epa. gov/safewater/disinfection/stage2/pdfs/guide stage2 stateimplementationguide.
pdf
USEPA. 2007c. Complying with the Stage 2 Disinfectant and Disinfection Byproducts Rule:
Small Entity Compliance Guide. EPA 815-R-07-014. Available at:
http://www.epa.gov/safewater/disinfection/stage2/pdfs/guide st2 stepguide smallentitycomplia
nceguide.pdf
USEPA. 2007d. Consecutive System Guide for the Ground Water Rule. EPA 815-R-07-020.
Available at: http://www.epa. gov/safewater/disinfection/gwr/pdfs/guide gwr consecutive-
guidance.pdf
USEPA. 2006a. Initial Distribution System Evaluation Guidance Manual for the Final Stage 2
Disinfectants and Disinfection Byproducts Rule. EPA 815-B-06-002. Available at:
http://www.epa.gov/safewater/disinfection/stage2/pdfs/guide idse full.pdf
USEPA. 2006b. Initial Distribution System Evaluation Guide for Systems Serving Fewer than
10,000 People for the Final Stage 2 Disinfectants and Disinfection Byproducts Rule. EPA 815-
B-06-001. Available at:
http://www.epa.gov/safewater/disinfection/stage2/pdfs/guide idse lessthan.pdf
USEPA. 2005. Preparing Your Consumer Confidence Report: Revised Guidance for Water
Suppliers. EPA 816-R-05-002. Available at:
http://www.epa.gov/safewater/ccr/pdfs/guide ccr forwatersuppliers.pdf
USEPA. 2004a. Code of Federal Regulations, Title 40 Section 141.2, Definitions. Available at:
http://a257.g.akamaitech.net/7/257/2422/12feb20041500/edocket.access.gpo.gov/cfr 2004/iulqtr
/pdf/40cfrl41 -2.pdf
USEPA. 2004b. Consumer Confidence Report Rule: A Quick Reference Guide. EPA 816-F-02-
026. Available at: http://www.epa.gov/OGWDW/ccr/pdfs/qrg ccr 2004.pdf
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
9-2
Draft for Discussion
Do not Quote. Do not Cite

-------
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
USEPA. 2001. The Stage 1 Disinfectants and Disinfection Byproducts Rule: What Does it Mean
to you? EPA 816-R-01-014. Available at:
http://www.epa.gov/safewater/mdbp/stage 1 dbprwhatdoesitmeantovou.pdf
USEPA. 2000a. Public Notification Handbook. EPA 816R-00-010. Washington, D.C.: USEPA.
USEPA. 2000b. The Public Notification Rule: A Quick Reference Guide. EPA
816-F-00-023. Available at:
http://www.epa.gov/safewater/publicnotification/pdfs/qrg publicnotification.pdf
USEPA. 1999a. Alternative Disinfectants and Oxidants Guidance Manual. Office of Water.
EPA 815-R-99-014. Available at:
http://www.epa. gov/safewater/mdbp/alternative disinfectants guidance.pdf
USEPA. 1999b. Enhanced Coagulation and Enhanced Precipitative Softening Guidance
Manual. EPA 815-R-99-012. Available at: http://www.epa.gov/safewater/mdbp/coaguide.pdf
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
9-3
Draft for Discussion
Do not Quote. Do not Cite

-------
1

-------
1	Appendix A
2	Example of a Formal Agreement between Consecutive and Wholesale Systems
3

-------
1

-------
Date:
To the Denver Board of Water Commissioners;
The Board of				(hereafter Distributor)
requests to be included in Denver Water's Integrated System under the Colorado
Primary Drinking Water Regulations (CPDWR). This Board acknowledges that it is
legally and enforceably obligated to comply with Denver Water's Operating Rules and
Engineering Standards through its distributor agreement with Denver Water. It further
acknowledges that such rules and standards include the standard operating procedures
adopted by the reference in Chapter 12 of the Engineering Standards,
Distributor's contact person: 	_			
Address:	"
Phone:
No. of people served:					
The responsibilities of the parties are set forth as follows:
Denver Water is responsible for:
( ) all monitoring and MCL requirements related to microbiological
contaminants (Article 3, CDPWR)
( ) all monitoring, reporting and MCL requirements related to
disinfection byproducts (Art. 5 CPDWR) unless a distributor adds
disinfectant in the distribution system
( ) all tap monitoring, reporting, corrosion control and public education
requirements of the lead and copper rule (Art. 7, CDPWR)
( ) all collection, reporting and compliance with residual disinfectant
requirements (Art. 9, CPDWR)
( ) all public notification requirements (Art. 10, CPDWR)
( ) all requirements for annual consumer confidence report (Art. 13,
CPDWR)
( ) cleaning of treated water storage facilities (additional charge
required)
( ) cross-connection control program (Art. 12, CPDWR)
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
A-l
Draft for Discussion
Do not Quote. Do not Cite

-------
Distributor is responsible for all other requirements for consecutive systems enumerated
by Article 1.6 of the CPDWR, specifically including but not limited to:
( ) distribution system operator certification
( ) hydrant inspection program
( ) valve inspection program
( ) lead service line replacement requirements (Art, 7, CPDWR)
( ) operation of treated water storage (check if distributor has
treated water storage)
( ) water quality customer complaints, communication and initial
response
( ) leak repair and main disinfection
( ) distribution system discharges
{ ) maintenance of treated water storage (cleaning can be
contracted to Denver Water if checked above)
( ) Instead of having Denver Water responsible, the Distributor prefers
to be responsible for its own cross-connection control program,
including all reporting, record-keeping and enforcement of
hazardous cross-connection requirements and backflow prevention
(Art. 12, CPDWR) (if checked, cross out and initial the last
responsibility under Denver Water)
Distributor further certifies that it (does/does not) provide further disinfection to the water
it receives from Denver Water,
ATTEST:
[NAME OF DISTRIBUTOR]
By				By	
Title
Address
ACCEPTED BY DENVER WATER:
October 2007 Draft Stage 2 DBPR
Consecutive Systems Guidance Manual
A-2
Draft for Discussion
Do not Quote. Do not Cite

-------
Date:
Manager of Water Quality
October 2007 Draft Stage 2 DBPR	A-3	Draft for Discussion
Consecutive Systems Guidance Manual	Do not Quote. Do not Cite

-------

-------