United States Environmental Protection Agency
General Permit for New or Modified Minor Sources of Air
Pollution in Indian Country
http://www.epa.gov/air/tribal/tribalnsr.html
General Air Quality Permit for New or Modified True Minor Source Hot
Mix Asphalt Plants in Indian Country
Information about this General Permit:
Applicability
Pursuant to the provisions of the Clean Air Act (CAA), Subchapter I, part D and 40 CFR part 49, subpart C, this
permit authorizes the construction or modification and the operation of each stationary and portable hot mix
asphalt plant for which a reviewing authority issues an Approval of the Request for Coverage (permitted source).
Eligibility
To be eligible for coverage under this general permit, the permitted source must qualify as a true minor source
as defined in 40 CFR 49.152.
Request for Coverage
Requirements for submitting a Request for Coverage are contained in Section 7 of this general permit.
Incorporation of Documents
The information contained in each reviewing authority's Approval of the Request for Coverage is hereby
incorporated into this general permit.
Termination
Section 6 of this general permit addresses a reviewing authority's ability to revise, revoke and reissue, or
terminate this general permit. It also addresses the reviewing authority's ability to terminate an individual
permitted source's Approval of the Request for Coverage under this general permit.
Definitions
The terms used herein shall have the meaning as defined in 40 CFR 49.152, unless otherwise defined in
Attachment B of this permit. If a term is not defined, it shall be interpreted in accordance with normal business
use.
$
<
33
V
o
w
PRO^t&
III
0

-------
Permit Terms and Conditions
The following applies to each permittee and permitted source with respect to only the affected emissions units
and any associated air pollution control technologies in that permitted source's Approval of the Request for
Coverage.
Section 1 - General Provisions
1.	Construction and Operation
The permittee shall construct or modify and shall operate the affected emissions units and any associated
air pollution control technologies in compliance with this permit and all other applicable federal air quality
regulations; and in a manner consistent with representations made by the permittee in the Request for
Coverage, to the extent the reviewing authority relies upon these representations in issuing the Approval of
the Request for Coverage.
2.	Locations
This permit only authorizes the permittee to construct or modify and to operate the permitted source in the
location(s) listed in the reviewing authority's Approval of the Request for Coverage for that permitted
source.
3.	Liability
This permit does not release the permittee from any liability for compliance with other applicable federal
and tribal environmental laws and regulations, including the CAA.
4.	Severability
The provisions of this permit are severable. If any portion of this permit is held invalid, the remaining
terms and conditions of this permit shall remain valid and in force.
5.	Compliance
The permittee must comply with all provisions of this permit, including emission limitations that apply to the
affected emissions units at the permitted source. Noncompliance with any permit provision is a violation of
the permit and may constitute a violation of the CAA; is grounds for an enforcement action; and is grounds
for the reviewing authority to revoke the Approval of the Request for Coverage and terminate the permitted
source's coverage under this general permit.
6.	National Ambient Air Quality Standards (NAAQS)/Prevention of Significant Deterioration (PSD) Protection
The permitted source must not cause or contribute to a NAAQS violation or, in an attainment area, must not
cause or contribute to a PSD increment violation.
7.	Unavailable Defense
It is not a defense for the permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the provisions of this permit.
8.	Property Rights
The permit does not convey any property rights of any sort or any exclusive privilege.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 2 of 15

-------
9.	Information Requests
You, as the permittee, shall furnish to the reviewing authority, within a reasonable time, any information
that the reviewing authority may request in writing to determine whether cause exists for revising, revoking
and reissuing, or terminating the permit or to determine compliance with the permit. For any such
information claimed to be confidential, the permittee must submit a claim of confidentiality in accordance
with 40 CFR part 2 subpart B.
10.	Inspection and Entry
Upon presentation of proper credentials, the permittee must allow a representative of the reviewing
authority to:
a.	Enter upon the premises where a permitted source is located or emissions-related activity is conducted
or where records are required to be kept under the conditions of the permit;
b.	Have access to and copy, at reasonable times, any records that are required to be kept under the
conditions of the permit;
c.	Inspect, during normal business hours or while the permitted source is in operation, any facilities,
equipment (including monitoring and air pollution control equipment), practices or operations regulated
or required under the permit;
d.	Sample or monitor, at reasonable times, substances or parameters for the purpose of assuring
compliance with the permit or other applicable requirements and
e.	Record any inspection by use of written, electronic, magnetic and photographic media.
11.	Posting of Coverage
This general permit, and the most current Approval of the Request for Coverage for the permitted
source, must be posted prominently at the facility, and each affected emissions unit and any associated
air pollution control technology must be labeled with the identification number listed in the Approval of
the Request for Coverage for that permitted source.
12.	Duty to Obtain Source-specific Permit
If the reviewing authority intends to terminate a permitted source's coverage under this general permit for
cause as provided in Section 6 of this general permit, then the permittee shall apply for and obtain a case-
by-case permit under 40 CFR 49.155 as required by the reviewing authority.
13.	Credible Evidence
For the purpose of establishing whether the permittee violated or is in violation of any requirement of this
permit, nothing shall preclude the use, including the exclusive use, of any credible evidence or information
relevant to whether a permitted source would have been in compliance with applicable requirements if the
permittee had performed the appropriate performance or compliance test or procedure.
14.	Setbacks
The permitted source shall not locate less than 150 feet from the nearest property boundary and not less
than 1,000 feet from the nearest residence.
Section 2: Emission Limitations and Standards
15.	The permittee shall maintain and operate each affected emissions unit, including any associated air
pollution control equipment, in a manner consistent with good air pollution control practices for minimizing
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 3 of 15

-------
emissions of New Source Review-regulated pollutants and considering the manufacturer's recommended
operating procedures at all times, including periods of startup, shutdown, maintenance and malfunction.
The reviewing authority will determine whether the permittee is using acceptable operating and
maintenance procedures based on information available to the reviewing authority which may include, but
is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures,
and inspection of the permitted source.
16.	Production of hot mix asphalt shall not exceed the following amounts:
a.	100,000 tons-per-month based on a 12-month rolling average from a drum mix asphalt plant; or
b.	33,000 tons-per-month based on a 12-month rolling average from a batch mix asphalt plant.
17.	Fuel combustion shall be limited to the following fuels:
a.	Natural gas, propane, distillate fuel, and biodiesel in the dryer/mixer and auxiliary heaters;
b.	Diesel and biodiesel in the stationary engines and generators.
18.	Liquid fuels shall contain no more than 0.0015 percent sulfur by weight.
19.	The combined fuel consumption in all engines and generators, excluding nonroad mobile engines, shall not
exceed the following amounts:
a.	12,500 gallons-per-calendar month, unless the permitted source is located in a serious ozone
nonattainment area; or
b.	2,500 gallons-per-calendar month if the permitted source is located in a serious ozone nonattainment
area;
c.	If the permitted source is located in both an attainment area and a nonattainment area in a single
calendar month, then the limitations in 19.a and b shall apply on a proportional basis for the calendar
month.
20.	Emissions from an affected dryer/mixer shall be controlled using a baghouse during all times when the
affected emissions unit operates.
21.	A supply of extra bags and other spare parts for the baghouse shall be maintained onsite.
22.	The permittee shall comply with the fugitive dust control plan in Attachment C.
23.	Each affected emissions unit shall not cause to be discharged into the atmosphere any gases that exhibit 20
percent opacity or greater averaged over any six-consecutive-minute period.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 4 of 15

-------
24. Emissions from each affected emissions unit mixer/dryer shall not exceed the following:
Fuel
Pollutant
Nonattainment
Attainment
Liquid
Carbon
Monoxide (CO)
600 ppmvd @ 3% 02
600 ppmvd @ 3% 02

Nitrogen Oxides
40 ppmvd @ 3% 02
140 ppmvd @ 3% 02

(NOx)



Particulate
0.01 gr/dscf
0.04 gr/dscf

Matter



(PM/PM10/PM2.5)


Gaseous
CO
400 ppmvd @ 3% 02
400 ppmvd @ 3% 02

NOx
36 ppmvd @ 3% 02
80 ppmvd @ 3% 02

pm/pm10/pm2.5
0.01 gr/dscf
0.04 gr/dscf
Notes
The nonattainment CO limit applies in areas classified as nonattainment for CO.
The nonattainment NOx limit applies in areas classified as nonattainment for ozone, N02 or

PM2.5.



The nonattainment PM limit applies in areas classified as nonattainment for PMi0 or PM2 5.

The nonattainment PM limit includes both filterable and condensable particulate matter.
25. Each affected compression ignition engine, excluding nonroad mobile engines, shall comply with the
following limitations and standards:
a.	Each compression ignition engine that commenced construction on or after June 12, 2006 shall be
certified to the applicable Tier standards in 40 CFR 89.112 and 40 CFR 1039.101 through 1039.104, for
all pollutants, for the same model year and maximum engine power.
b.	Each compression ignition engine that commenced construction before June 12, 2006 shall meet the
following standards based on the engine's maximum rated power.
Maximum
Engine Power
Rating
Emission Standard
<300 HP
(a) Change oil and filter every 1,000 hours of operation or annually, whichever
comes first; (b) Inspect air cleaner every 1,000 hours of operation or annually,
whichever comes first; (c) Inspect all hoses and belts every 500 hours of operation
or annually, whichever comes first, and replace as necessary.
300 < HP < 500
Limit CO to 49 ppmvd @ 15% 02 OR reduce CO emissions by 70 percent or more.
Emissions shall be controlled through the use of an oxidation catalyst. Engines
certified to Tier 3 standards in 40 CFR 89.112 are exempt from this limit.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 5 of 15

-------
HP >500
Limit CO to 23 ppmvd @ 15% 02 OR reduce CO emissions by 70 percent or more.
Emissions shall be controlled through the use of an oxidation catalyst. Engines
rated at less than or equal to 560kW that are certified to Tier 3 standards in 40 CFR
89.112 are exempt from this limit. Engines rated at greater than 560kW that are
certified to Tier 2 standards in 40 CFR 89.122 are exempt from this limit.
Section 3: Monitoring and Testing Requirements
26.	Inspect Baghouse
At least once during each calendar week in which the permitted source operates, the permittee shall inspect
the interior and exterior of the baghouse for evidence of leaking, damaged, and missing bags, and take
appropriate corrective actions before resuming operations.
27.	Visible Emissions Survey
At least once during each calendar week in which the permitted sources operates, the permittee shall
perform a visible emissions survey of all affected emissions units subject to the opacity limit in Condition 23.
The survey shall be performed during daylight hours by an individual trained in the U.S. Environmental
Protection Agency (EPA) Method 22 while the permitted source is in operation. If visible emissions are
detected during the survey, the permittee shall either:
a.	Take corrective action so that within 24 hours no visible emissions are detected from any affected
emissions units while they are in operation; or
b.	Demonstrate compliance with the opacity limit at all units that discharged visible emissions during the
survey using EPA Method 9 by an individual trained and certified in Method 9.
28.	Fugitive Emissions Survey
At least once during each calendar week in which the permitted source operates, the permittee shall survey
the facility for visible fugitive emissions. If fugitive emissions are detected crossing the property line the
permittee shall take corrective actions according to the attached fugitive dust control plan (Attachment C).
29.	Initial Performance Test for Mixer/Dryer
Within 60 days after achieving the maximum production rate at which the permitted source will operate the
affected emissions unit(s), but not later than 180 days after the first day of operation after receiving
coverage under the general permit, the permittee shall perform an initial performance test to verify
compliance with the applicable emission limitations in Condition 24. Performance tests shall be performed:
a.	According to a test plan approved by the reviewing authority;
b.	While the permitted source is operating under typical operating conditions;
c.	Using test methods from 40 CFR part 60, appendix A unless alternative methods are approved by the
reviewing authority in writing in advance of the test;
d.	Using Method 5 with a sample volume of at least 31.8 dscf to determine particulate matter
concentration; and
e.	Simultaneously for CO and NOx whenever either one needs to be tested.
Compliance with each limit shall be demonstrated by averaging the results of at least three test runs of at
least one hour duration each, unless the permittee can demonstrate to the satisfaction of the reviewing
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 6 of 15

-------
authority that the result of one of the test runs should be discarded. The test results the permittee submits
must contain at least two test runs.
30.	Additional Performance Test(s) for Mixer/Dryer
Ongoing performance tests meeting the criteria of the initial performance test in Condition 29 shall be
performed:
a.	When required by the reviewing authority;
b.	When the hot mix asphalt plant is relocated to an area classified as nonattainment for CO, ozone, N02,
PMio, or PM2.5 from an area that is in attainment or unclassifiable for that pollutant unless the most
recent compliance test showed compliance with the applicable nonattainment emission limits; and
c.	At least every five years.
31.	Inspection and Tune-up following Relocation of Mixer/Dryer
Whenever the permitted source relocates to sites approved under this permit, the permittee shall conduct
an inspection and tune-up of the dryer/mixer burners meeting the following requirements:
a.	Burners shall be visually inspected and components cleaned or replaced as necessary;
b.	The flame pattern shall be inspected and adjusted consistent with the manufacturer's specifications;
c.	The combustion zone shall be inspected and adjusted so it is unobstructed by aggregate or other solid
materials;
d.	The system controlling the air-to-fuel ratio shall be inspected to ensure it is correctly calibrated and
functioning properly;
e.	CO and NOx concentrations (in ppm) and 02 concentration (in percent by volume) in the exhaust stream
shall be measured to ensure compliance with the applicable emission limits in Condition 24 and the
burners adjusted as necessary. Measurements may be taken using portable analyzers following the
procedures specified by ASTM standard D6522-11.
32.	Performance Test for Engines
Within 60 days after achieving the maximum production rate at which the permitted source will operate,
but not later than 180 days after the first day of operation after issuance of the Approval of the Request for
Coverage the permittee shall perform a performance test to verify compliance with the CO and emission
limits in Condition 25, as applicable, as follows:
a.	According to an EPA-approved test plan;
b.	While the hot mix asphalt plant is operating under typical operating conditions;
c.	Using test methods from 40 CFR part 60, appendix A, or portable analyzers allowed by 40 CFR part 63,
subpart ZZZZ, unless alternative methods are approved by the reviewing authority in writing in advance
of the test;
d.	While the catalyst inlet temperature and pressure drop are being monitored and recorded;
e.	Upon completion of the performance test, the permittee shall establish the operating range for the
catalyst inlet temperature based on a 4-hour average and the pressure drop across the catalyst; and
f.	The permittee shall conduct subsequent performance tests according to this paragraph whenever
required by the reviewing authority.
33.	Continuous Parameter Monitoring at Engines
For each engine subject to a CO emission limitation the permittee shall install, operate, and maintain a
continuous parameter monitoring system according to the methods in 40 CFR 63.6625(b) to continuously
monitor catalyst inlet temperature. Catalyst temperature data shall be reduced to 4-hour rolling averages.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 7 of 15

-------
The permittee shall maintain the 4-hour rolling average catalyst inlet temperature within the operating
parameter established during the most recent performance test.
34.	Pressure Drop Monitoring at Engines
For each engine subject to a CO emission limitation the permittee shall monitor the pressure drop across the
catalyst on a monthly basis. The permittee shall ensure the pressure drop across the catalyst is within the
operating parameters established during the most recent performance test.
Section 4: Recordkeeping Requirements
35.	The permittee shall maintain all records required to be kept by this permit for at least five years from the
date of origin, unless otherwise stated, either onsite or at a convenient location, such that they can be
delivered to the reviewing authority within 24 hours of a request.
36.	The permit application and all documentation supporting that application shall be maintained by the
permittee for the duration of time the affected emissions unit(s) is covered under this permit.
37.	The amount of asphalt produced each month shall be recorded.
38.	The types and quantities of fuel combusted in each affected emissions unit, including engines and
generators, shall be recorded each month.
39.	The dates and results of all baghouse inspections performed pursuant to Condition 26 and any corrective
actions taken as a result of the required inspections shall be recorded.
40.	The dates and results of each visible emissions survey performed pursuant to Condition 27 shall be
recorded. At a minimum, records shall include:
a.	The name of the person, company or entity conducting the survey;
b.	Whether visible emissions were detected from any affected emissions unit;
c.	Any corrective action taken;
d.	The result of any corrective action; and
e.	The results of any Method 9 tests performed.
41.	The dates and results of each fugitive emissions survey performed pursuant to Condition 28, any corrective
action taken as a result of each survey, and the result of any corrective action taken shall be recorded.
42.	The results of each performance test conducted pursuant to Condition 29, 30, or 32 shall be recorded. At a
minimum, the permittee shall maintain records of:
a.	The date of each test;
b.	Each test plan;
c.	Any documentation required to approve an alternate test method;
d.	Test conditions, including the amount of asphalt produced and the type and amount of fuel combusted
in the mixer/dryer during each test run; and
e.	The results of each test;
f.	The name of the company or entity conducting the analysis.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 8 of 15

-------
43.	The dates and results of each dryer/mixer inspection and tune up performed pursuant to Condition 31, any
corrective action taken as a result of each inspection and tune up, and the result of any corrective action
taken shall be recorded.
44.	A log of all maintenance activities conducted on each engine, excluding nonroad mobile engines, shall be
recorded.
45.	The date, time, and duration of each deviation from the established catalyst operating parameters for each
engine, corrective actions taken to return the equipment to normal operation and the results of any
corrective action taken shall be recorded.
Section 5: Notification and Reporting Requirements
46.	Notification of construction or modification, and operations
The permittee shall submit a written or electronic notice to the reviewing authority within 30 days from
when the permittee begins actual construction, and when the permittee begins operations or resumes
operation.
47.	Notification of Relocation
When a permittee intends to relocate the permitted source to an alternate location contained in the
Approval of the Request for Coverage, then the permittee must notify the reviewing authority electronically
within 30 days before or after such relocation. The notification must identify the owner, the current
location, and the new location of the permitted source.
48.	Notification of Change in Ownership
If the permitted source changes ownership, then the permittee must submit a written or electronic notice to
the reviewing authority within 90 days after the change in ownership is effective. In the report, the
permittee must provide the reviewing authority a written agreement containing a specific date for transfer
of ownership, and an effective date on which the new owner assumes partial and/or full coverage and
liability under this permit. The submittal must identify the previous owner, and update the name, street
address, mailing address, contact information, and any other information about the permitted source if it
would change as a result of the change of ownership. The permittee shall ensure that the permitted source
remains in compliance with the general permit during any such transfer of ownership.
49.	Notification of Closure
The permittee must submit a report of any permanent or indefinite closure to the reviewing authority in
writing within 90 days after the cessation of all operations at the permitted source. The notification must
identify the owner, the current location, and the last operating location of the permitted source. It is not
necessary to submit a report of closure for regular, seasonal closures.
50.	Annual Reports
The permittee shall submit an annual report on or before March 15 of each year to the reviewing authority.
The annual report shall cover the period from January 1 to December 31 of the previous year and shall
include:
a. An evaluation of the permitted source's compliance status with the requirements in Section 2 for each
location in which the permitted source located during the calendar year;
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 9 of 15

-------
b.	Summaries of the required monitoring and recordkeeping in Sections 3 and 4; and
c.	Summaries of deviation reports submitted pursuant to Condition 51.
51.	Deviation Reports
The permittee shall promptly report to the reviewing authority any deviations from permit requirements
including deviations attributable to upset conditions. Deviation reports shall include:
a.	The identity of affected emissions unit where the deviation occurred.
b.	The nature of the deviation;
c.	The length of time of the deviation;
d.	The probable cause of the deviation; and
e.	Any corrective actions or preventive measures taken as a result of the deviation to minimize emissions
from the deviation and to prevent future deviations.
f.	For the purposes of this permit, promptly shall be defined to mean:
i.	Within 72 hours of discovery for deviations from any opacity or emission limit in Condition 24 or 25;
or
ii.	Within 30 days after the end of the month in which the permittee discovered the deviation, for all
other deviations.
52.	Performance Test Reports
The permittee shall submit a test report to the reviewing authority within 45 days after the completion of
any required performance test. At a minimum, the test report shall include:
a.	A description of the affected emissions unit and sampling location(s);
b.	The time and date of each test;
c.	A summary of test results, reported in units consistent with the applicable standard;
d.	A description of the test methods and quality assurance procedures used;
e.	A summary of any deviations from the proposed test plan and justification for why the deviation(s) was
necessary;
f.	The amount of fuel burned, raw material consumed, and product produced during each test run;
g.	Operating parameters of the affected emissions units and control equipment during each test run; and
h.	Sample calculations of equations used to determine test results in the appropriate units.
i.	The name of the company or entity performing the analysis.
53.	Reporting and Notification Address
The permittee shall send all required reports to the reviewing authority at the mailing address(es) specified
in the Approval of the Request for Coverage.
54.	Signature Verifying Truth, Accuracy, and Completeness
All reports required by this permit shall be signed by a responsible official as to the truth, accuracy, and
completeness of the information. The report must state that, based on information and belief formed after
reasonable inquiry, the statements and information are true, accurate, and complete. If the permittee
discovers that any reports or notification submitted to the reviewing authority contain false, inaccurate, or
incomplete information, the permittee shall notify the reviewing authority immediately and correct or
amend the report as soon as practicable.
Section 6: Changes to this General Permit
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 10 of 15

-------
55.	Revising, Reopening, Revoking and Reissuing, or Terminating for Cause
The permit may be revised, reopened, revoked and reissued, or terminated for cause. The filing of a request
by you, the permittee, for a permit revision, revocation and re-issuance, or termination, or of a notification
of planned changes or anticipated noncompliance does not stay any permit condition. This provision also
applies to the documents incorporated by reference.
56.	Terminating Coverage under this Permit
The reviewing authority may terminate a previously issued Approval of the Request for Coverage, and
thereby terminate that permittee's authorization to construct or modify, and that permitted source's
authorization to operate under this general permit for cause as defined in Attachment B. The reviewing
authority may provide the permittee with notice of the intent to terminate and delay the effective date of
the termination to allow the permittee to obtain a case-by-case permit under 40 CFR 49.155.
57.	Change in ownership
If the permitted source changes ownership, the reviewing authority may change the Approval of the
Request of Coverage to reflect the new ownership in accordance with the administrative amendment
provisions in 40 CFR 49.159(f).
Section 7: Obtaining Coverage under this General Permit
58.	To obtain coverage under this general permit, an applicant must submit a Request for Coverage to the
appropriate reviewing authority for the area in which the permitted source is or will be located. Attachment
D contains a list of reviewing authorities and their area of coverage.
59.	If the plant will locate in area covered by more than one reviewing authority, the applicant need only submit
a Request for Coverage to one reviewing authority with regard to all intended locations of operation. The
Request for Coverage must contain the information requested in the standard application form for this
permit. You must also submit a copy of the Request for Coverage to the Indian governing body for any area
in which the permitted source will operate.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 11 of 15

-------
Attachment A: Abbreviations and Acronyms
ASTM	American Society for Testing and Materials
Btu	British thermal units
CAA or the Act Federal Clean Air Act
CFR	Code of Federal Regulations
CO	carbon monoxide
EPA	United States Environmental Protection Agency
gr/dscf	gram per dry standard cubic foot
Hg	mercury
hp	horsepower
kW	kilowatt
NAAQS	National Ambient Air Quality Standards
N02	nitrogen dioxide
NOx	oxides of nitrogen except N20
NSR	New Source Review
PM	particulate matter
PM10	particulate matter with an aerodynamic diameter less than 10 microns
PM2.5	particulate matter with an aerodynamic diameter less than 2.5 microns
ppm	parts per million
ppmvd	parts per million by volume, dry basis
PSD	Prevention of Significant Deterioration
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 12 of 15

-------
Attachment B: Definitions
For the purposes of this general permit:
Approval of the Request for Coverage means a reviewing authority's letter granting an applicant's request for
construction or modification, and operation of a true minor source under the terms and conditions of this
general permit.
Biodiesel means a combustion fuel made from fatty acids of methyl esters that complies with the specifications
of ASTM 6751.
Cause means with respect to the reviewing authority's ability to terminate a permitted source's coverage under
a permit that:
1.	The permittee is not in compliance with the provisions of this general permit;
2.	The reviewing authority determines that the emissions resulting from the construction or modification
of the permitted source significantly contribute to National ambient air quality standard (NAAQS)
violations, which are not adequately addressed by the requirements in this general permit;
3.	The reviewing authority has reasonable cause to believe that the permittee obtained Approval of the
Request for Coverage by fraud or misrepresentation; or
4.	The permittee failed to disclose a material fact required by the Request for Coverage or the regulations
applicable to the permitted source of which the applicant had or should have had knowledge at the time
the permittee submitted the Request for Coverage.
Construction means any physical change or change in the method of operation including fabrication, erection,
installation, demolition, or modification of an affected emissions unit that would result in a change of emissions.
Distillate fuel means fuel oils, including recycled oils that comply with the specifications for fuel oil numbers 1
and 2, as defined by ASTM 396, or equivalent.
Natural gas means a mixture of hydrocarbons that is a gas at standard conditions and is either composed of at
least 70 percent methane by volume or has a gross calorific value of between 950 and 1150 Btu per dry standard
cubic foot.
Permittee means the owner or operator of a permitted source.
Permitted source means each stationary and portable hot mix asphalt plant for which a reviewing authority
issues an Approval of the Request for Coverage.
Request for Coverage means a permit application that contains all the information required in the standard
application form.
Standard cubic foot means a measure of the quantity of a gas equal to a cubic foot of volume at a temperature
of 68 °F and a pressure of 29.92 in. Hg.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 13 of 15

-------
Attachment C: Dust Control Plan
1.	Site Roadways and Plant Yard
a.	The dust on the site roadways/plant yard shall be controlled by applications of water, calcium chloride
or other acceptable fugitive dust control compound approved by the reviewing authority. Applications
of dust suppressants shall be done as often as necessary to meet all applicable emission limits.
b.	All paved roadways/plant yards shall be swept as needed between applications.
c.	Any material spillage on roads shall be cleaned up immediately.
2.	Plant
a.	The drop distance at each transfer point shall be reduced to the minimum the equipment can achieve.
b.	The transfer point from the re-circulating belt to the feed belt shall be equipped with an enclosed chute.
3.	Storage Piles
a.	Stockpiling of all nonmetallic minerals shall be performed to minimize drop distance and control
potential dust problems.
b.	Stockpiles shall be watered on an as needed basis in order to meet the opacity limits. Also, equipment to
apply water or dust suppressant shall be available at the site, or on call for use at the site, within a given
operating day.
4.	Truck Traffic
a.	Vehicles shall be loaded to prevent their contents from dropping, leaking, blowing or otherwise
escaping. This shall be accomplished by loading so that no part of the load shall come in contact within
six (6) inches of the top of any side board, side panel or tail gate; otherwise, the truck shall be tarped.
b.	A speed limit sign of 15 miles-per-hour or lower shall be posted on site so that it is visible to truck traffic.
5.	Corrective Actions
If corrective action needs to be taken, the permittee shall consider and use one or more of the following
options: adjust the watering and/or sweeping frequencies, reduce drop distances, increase cover, and/or
take other actions to reduce fugitive dust emissions.
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 14 of 15

-------
Attachment D - List of Reviewing Authorities and Areas of Coverage
EPA Region
Address
Area Covered
Phone Number
Region 1
1 Congress Street
Suite 1100
Boston, MA 02114-2023
Connecticut, Maine, Massachusetts,
New Hampshire, Rhode Island, and
Vermont
888- 372-7341
617-918-1111
Region II
290 Broadway
25th Floor
New York, NY 10007-1866
New Jersey, New York, Puerto Rico,
and Virgin Islands
877-251-4575
Region III
1650 Arch Street
Philadelphia, PA 19103-2187
Delaware, District of Columbia,
Maryland, Pennsylvania, Virginia,
and West Virginia
800-438-2474
215-814-5000
Region IV
Sam Nunn Atlanta Federal Center
61 Forsyth Street SW
12th Floor
Atlanta, GA 30303
Alabama, Florida, Georgia, Kentucky,
Mississippi, North Carolina, South
Carolina, and Tennessee
800-241-1754
404-562-9000
Region V
77 West Jackson Street
Chicago, IL 60604
Illinois, Indiana, Michigan,
Minnesota, Ohio, and Wisconsin.
800-621-8431
312-353-2000
Region VI
1445 Ross Avenue
Dallas, TX 75202
Arkansas, Louisiana, New Mexico,
Oklahoma, and Texas
800-887-6063
214-665-2760
Region VII
11201 Renner Boulevard
Lenexa, KS 66219
Iowa, Kansas, Missouri, and
Nebraska
800-223-0425
913-551-7003
Region VIII
1595 Wynkoop Street
Denver, CO 80202-1129
Colorado, Montana, North Dakota,
South Dakota, Utah, and Wyoming
800-227-8917
303-312-6312
Region IX
75 Hawthorne Street
San Francisco, CA 94105
American Samoa, Arizona,
California, Guam, Hawaii, Nevada,
and Northern Mariana Islands
866-EPA-9378
415-947-8000
Region X
1200 Sixth Avenue
Seattle, WA 98101
Alaska, Idaho, Oregon, and
Washington
800-424-4372
206-553-1200
General Permit for Hot Mix Asphalt Plants
Version 1.0
Page 15 of 15

-------