United States
Environmental Protection Agency
FISCAL YEAR 2022
Justification of Appropriation
Estimates for the Committee
on Appropriations
Tab 13: Program Performance and Assessment
May 2021
EPA-190-R-21-002	www.epa.gov/cj

-------
Environmental Protection Agency
FY 2022 Performance Measures
Table of Contents - Program and Performance Assessment	
FY 2022 Performance Measures	723
721

-------
722

-------
FY 2022 Performance Measures
For additional information and past results on EPA's annual performance goals, see the EPA FY 2020 Annual Performance Report.
Performance Measure
FY 2021 Target
FY 2022 Target
PM NA1) Number of Nonattaimnent Areas.
121
101
(PM CRT) Number of certificates of conformity issued that demonstrate that the respective engine, vehicle,
equipment, component, or system conforms to all of the applicable emission requirements and may be entered into
commerce.
4,700
4,700
(PM DW-02) Community water systems still out of compliance with health-based standards since September 30,
2017.
875
701
(PM INFRA-01) Billions of non-federal dollars leveraged by EPA water infrastructure finance programs (CWSRF,
DWSRF and WIFIA).
8.0
8.0
(PM SWP-01) Square miles of watersheds with surface waters not meeting standards (cumulative).
539,536
531,536
(PM SWP-02) Square miles of watersheds with surface waters not meeting standards because of nutrients.
183,596
180,596
(PM TMDL-02) Percentage of priority TMDLs, alternative restoration plans, and protection approaches in place.
84
100
(PM NPDES-03) Number of existing EPA-issued NPDES permits in backlog.
230
93
(PM S10) Number of Superfund sites made ready for anticipated use site-wide.
51
51
(PM 170) Number of remedial action projects completed at Superfund sites.
80
80
(PM 151) Number of Superfund sites with human exposures brought under control.
10
15
(PM 137) Number of Superfund removals completed.
141
183
(PM B30) Number of brownfields sites made ready for anticipated use.
684
684
(PM B37) Billions of dollars of cleanup and redevelopment funds leveraged at brownfields sites.
1.3
1.3
723

-------
Performance Measure
FY 2021 Target
FY 2022 Target
(PM RSRAU) Number of RCRA corrective action facilities made ready for anticipated use.
133
140
(PM CA5RC) Number of RCRA corrective action facilities with final remedies constructed.
73
49
(PM HW5) Number of permit renewals issued at hazardous waste facilities.
100
90
(PM RFW) Number of stakeholder actions taken to increase recycling and reduce food loss and waste.
9,750
10,733
(PM 112) Number of LUST cleanups completed that meet risk-based standards for human exposure and
groundwater migration.
11,200
11,200
(PM CR1) Number of confirmed releases at UST facilities
No Target
Established
5,150
(PM P2mtc) Reductions in metric tons of carbon dioxide equivalent (MTC02e) released.
No Target
Established
TBD
(PM SCI) Number of new products certified by the Safer Choice program.
200
200
(PM TSCA1) Number of final EPA-initiated TSCA risk evaluations completed within statutory timelines.1
N/A
N/A
(PM TSCA2) Number of final existing chemical TSCA risk management actions completed within statutory
timelines.
1
0
(PM TSCA3) Percentage of final TSCA new chemical determinations for Pre-Manufacture Notices, Significant
New Use Notices and Microbial Commercial Activity Notices completed within the initial 90-day statutory
timeframe.
80
100
(PM TSCA3b) Percentage of final TSCA new chemical determinations for Pre-Manufacture Notices, Significant
New Use Notices and Microbial Commercial Activity Notices completed within the full timeframes allowable by
statute.
100
100
1 This measure has no targets available for FY 2021 and FY 2022 because there are no statutory deadlines in those years. For more information, see the FY 2020
Annual Performance Report at https://www.epa.gov/planandbudget/fV-2020-annual-perfonnance-report-apr.
724

-------
Performance Measure
FY 2021 Target
FY 2022 Target
(PM FIFRA1) Number of FIFRA decisions completed through pesticides registration review.
110
122
(PM FIFRA2) Number of FIFRA registration review draft risk assessments completed.
60
20
(PM PRIA1) Average number of days to complete PRIA decisions for new active ingredients.
607
595
(PM PRIA2) Average number of days exceeding the PRIA decision timeframes for new active ingredients where
the original PRIA due date was not met.
263
256
(PM 091) Percentage of decisions (registration actions) completed on time (on or before PRIA or negotiated due
dates).
99
99
(PM 409) Number of federal on-site compliance monitoring inspections and evaluations and off-site compliance
monitoring activities.
10,000
10,000
(PM FOl) Percentage reduction in overdue FOIA requests from the April 2018 baseline.
75.00
100.00
(PM 444) Percentage of EPA inspection reports timely completed and sent within 70 days of inspection.
75
75
(PM 436) Number of all referred no complaint filed (RNCF) civil judicial cases that are more than 2.5 years old.
99
99
(PM 446) Quarterly percentage of Clean Water Act National Pollutant Discharge Elimination System (NPDES)
permittees in significant noncompliance with their permit limits.
12.7
10.1
(PM 434) Millions of pounds of pollutants and waste reduced, treated, or eliminated through concluded
enforcement actions.
325
325
(PM RD1) Percentage of Office of Research and Development (ORD) research products meeting stakeholder needs.
81
82
(PM PE2) Number of new permit applications in backlog.
24

(PM PE3) Number of existing permit applications in backlog.
256

(PM FA1) Reduction in EPA Space (sq. ft. owned and leased).
26,017
467,345
725

-------
Performance Measure
FY 2021 Target
FY 2022 Target
(PM PR1) Percentage of contract actions processed within the Procurement Action Lead Time (PALT) Standards.
95
97
(PM OP1) Number of operational processes improved.
500
540
(PM CF1) Number of administrative shared services.
9
10
(PM CF2) Number of Agency administrative subsystems.
19
17
726

-------

-------