Region 4 QAPP Review Checklist
Version 1.1- Revised March 29, 2007
EPA 402/B-07/002
REGION 4 QAPP REVIEW CHECKLIST
QAPP Title:
Project Location:
Originating Organization:
Receipt Date:
Review Date:
Reviewer:
Project Number:
USEPA - REGION 4
QUALITY ASSURANCE PROJECT PLAN REVIEW CHECKLIST
P=Present & Acceptable; NP=Not Present; I=Incomplete; NA=Not Applicable
ELEMENT
COMMENTS
Al. Title and Approval Sheet

Title

Organization's Name

Dated Signature of Project Manager

Dated Signature of Quality Assurance Officer

A2. Table of Contents

A3. Distribution List

A4. Project/Task Organization

Identifies key project personnel, with their roles and

Responsibilities well defined (includes end data users,
project QA manager, subcontractors, etc).

A5. Problem Definition/Background

Clearly states problems or decision to be made

Provides historical and background information

A6. Project/Task Description

Lists measurements to be made includes on-site field
analysis and off-site fixed laboratory analysis

Cites applicable technical, regulatory, or program-specific
standards, criteria, or objectives

Identifies types of personnel, equipment and instruments
required to perform field sampling, field analysis and
laboratory analysis

Provides work schedule and data deliverable timelines

Summarizes required project and QA records/reports

A7. Objectives and Criteria for Measurement Data

State project objectives - quantitatively and quantitatively

Links measurement quality objectives to applicable action
limits, criteria, etc.

Page 1 of 5
G:user-shared/R4 QAPP Review Checklist

-------
Region 4 QAPP Review Checklist
Version 1.1- Revised March 29, 2007
EPA 402/B-07/002
USEPA - REGION 4
QUALITY ASSURANCE PROJECT PLAN REVIEW CHECKLIST
P=Present & Acceptable; NP=Not Present; I=Incomplete; NA=Not Applicable
A8. Special Training Requirements/Certified Listed

States how training is provided, documented and assured

A9. Documentation and Records

Lists information and records to be included in data report
(e.g., raw data, field logs, results of QC checks, problems
encountered

Specifies the turnaround time for laboratory data
deliverables

Specifies the retention time and location for project records
and reports

Bl. Sampling Process Design (Rational for Design)

Specified the type, number and matrix of samples slated for
collection

Discusses the rationale for the proposed sampling design

Specifies sample locations and frequency of sample
collection at each location

B2. Sampling Methods Requirements

Describes sample collection procedures and methods

Lists equipment needs

Identifies support facilities

Identifies individuals responsible for corrective actions in
the field

Describes the process for preparation and decontamination
of sampling equipment

Describes selection and preparation of sample containers -
and specifies sample volumes

Describes sample container, volume, preservation and
holding time requirements per each chemical, physical or
biological parameter

B3. Sample Handling and Custody Requirements

Summarizes sample handling requirements

Summarizes chain-of-custody procedures

B4. Analytical Methods Requirements

Identifies the analytical methods to be followed (including
method number - and sample preparation method such as
digestion/extraction method where applicable)

B5. Quality Control Requirements

Identifies QC procedures and frequency for each sampling
event, analysis, or measurement technique, as well as
associated acceptance criteria and corrective actions

References procedures and provides equations for

Page 2 of 5
G:user-shared/R4 QAPP Review Checklist

-------
Region 4 QAPP Review Checklist
Version 1.1- Revised March 29, 2007
EPA 402/B-07/002
USEPA - REGION 4
QUALITY ASSURANCE PROJECT PLAN REVIEW CHECKLIST
P=Present & Acceptable; NP=Not Present; I=Incomplete; NA=Not Applicable
calculating QC statistics including bias/accuracy, precision -
specifies acceptance criteria for completeness,
comparability and representativeness

B6. Instrument/Equipment Testing, Inspection and
Maintenance Requirements

Identifies acceptance testing of sampling and measurement
systems

Describes equipment preventive and corrective maintenance

Summarizes availability and location of spare parts

B7. Instrument Calibration and Frequency

Identifies equipment needing calibration and frequency for
such calibration

Summarizes required calibration standards, gases and/or
equipment

Cites calibration records and the manner traceable to
equipment

B8. Inspection/Acceptance Requirements for Supplies and
Consumables

Provides a list of the supplies and consumables including
pH buffers, conductivity and turbidity standards, etc.

States acceptance criteria for supplies and consumables

Identifies the individuals responsible for inspecting supplies
and consumables to ensure compliance with requirements

B9. Data Acquisition Requirements for Non-Direct
Measurements

Identifies type of data needed from non-measurement
sources (e.g., computer databases, literature searches,
models, etc.) and provides the acceptance criteria for using
this information

Describes the limitations of this information and specifies
when and when it cannot be used

Documents the rationale for original collection of data and
its relevance to the project

BIO. Data Management

Describes record/data keeping, storage and retrieval
policies/requirements for organization/project

Provides attachments to the QAPP containing SOPs,
Checklists, Analytical Methodologies, etc.

Describes data handling equipment and procedures used to
process, compile and analyze data (e.g., computer hardware
and software) - identifies the type of software used such as
Excel, Statistical, Data Validation, etc.

Page 3 of 5
G:user-shared/R4 QAPP Review Checklist

-------
Region 4 QAPP Review Checklist
Version 1.1- Revised March 29, 2007
EPA 402/B-07/002
USEPA - REGION 4
QUALITY ASSURANCE PROJECT PLAN REVIEW CHECKLIST
P=Present & Acceptable; NP=Not Present; I=Incomplete; NA=Not Applicable
Describes the process for assuring that applicable Office of
Information Resource requirements are satisfied.

CI. Assessments and Response Actions

Lists the required number, frequency and type of
assessments or audits complete with dates and names of
auditors/personnel conducting these assessments
(assessments can include management system reviews,
technical systems reviews, peer reviews, surveillance,
performance evaluation audits, laboratory audits, data
quality audits, etc.)

Describes the process for planning audits and assessments
and identifies the individuals that participate in this planning

Identifies those individuals responsible for performing
audits and assessments

Specifies the auditors independence, authority and
competence in performing audits/assessments

Specifies how audit findings are documented, verified and
communicated to project personnel, senior management and
EPA

Identifies individual(s) responsible for implementing
corrective actions

C2. Reports to Management

Identifies the frequency and distribution of reports for:

Project Status Reports

Results of Performance Evaluations and Audits

Results of periodic data quality assessments

Results of quality assurance problems

Identifies those individuals responsible for preparing reports
and those that will receive these items

Dl. Data Review, Validation and Verification

Specifies criteria for accepting, rejecting or qualifying data

Provides a list of data qualifier flags and provides definition
of each flag

Provides project-specific statistics, calculations or
algorithms

D2. Validation and Verification Methods

Describes or provides the data validation and verification
process (can provide validation SOPs)

Describe resolution procedures for data quality problems
and identifies individuals responsible for resoling data
quality issues

Describes the procedures for documenting the results of data

Page 4 of 5
G:user-shared/R4 QAPP Review Checklist

-------
Region 4 QAPP Review Checklist
Version 1.1- Revised March 29, 2007
EPA 402/B-07/002
USEPA - REGION 4
QUALITY ASSURANCE PROJECT PLAN REVIEW CHECKLIST
P=Present & Acceptable; NP=Not Present; I=Incomplete; NA=Not Applicable
validation, review and verification

Describes the process for communicating data validation
results to project personnel

D3. Reconciliation of Data to Project Objectives

Describes the process for reconciling project results with the
project-specific data quality objectives and identifies the
limitations of the data

Specifies the usability of the data and verifies that it meets
project objectives

Identifies the individuals who are responsible for
reconciling the data to the project data quality objectives

Final QAPP Disposition:
	Approved, no comments
	Approved, with comments, Address Comments, Submit Revised QAPP to EPA PO
	Conditionally Approved, Address Comments, Submit Revised QAPP to EPA PO
	Not Approved, Address Comments, Submit Revised QAPP to EPA PO
References
1.	EPA Requirements for Quality Assurance Project Plans. EPA QA/R-5, EPA/240/B-
01/002 (March 2001).
2.	EPA Guidance on Systematic Planning Using the Data Quality Objectives Process.
EPA QA/G-4, EPA/240/B-06/001 (February 2006).
Both documents can be accessed at the following website: www.epa.gov/qualitv - Select
guidance from the menu options to the left of the screen.
Page 5 of 5