GROUNDWATER PATHWAY ANALYSIS
FOR LEAD-BASED PAINT (LBP)
ARCHITECTURAL DEBRIS
BACKGROUND DOCUMENT
Work Assignment Manager
and Technical Direction:
Dr. Zubair A. Saleem
U.S. Environmental Protection Agency
Office of Solid Waste, MC 5307W
Washington, DC 20460
Prepared by:
HydroGeoLogic, Inc.
1155 Herndon Parkway, Suite 900
Herndon, VA 20170
Under Contract No.: 68-W7-0035
U.S. Environmental Protection Agency
Office of Solid Waste
Washington, DC 20460
June, 1998

-------
TABLE OF CONTENTS
Page
1.0 INTRODUCTION	 1
2.0 MODELING APPROACH AND DATA SOURCES 	 2
2.1	Modeling Approach	 2
2.2	Modeling Scenarios for Lead Based Painted (LBP) Debris 	 8
2.4	Landfill Depth and Waste Quantity	10
2.4.1	Waste Quantities Estimated from Lead Abatement Programs	10
2.4.2	Waste Quantities Including Painted Demolition Debris	12
2.4.2.1	LBP Debris Disposed in C&D Landfills	12
2.4.2.2	Waste Disposed in Municipal Landfills	14
2.5	Waste and Leachate Concentration 	14
3.0 RESULTS	22
3.1	Results Based on LBP Abatement Debris in C&D Landfills	22
3.2	Results of the Analysis for Lead Abatement Debris Plus Painted Demolition Debris
	28
3.2.1	Results for C&D Landfills	29
3.2.2	Results for Municipal Landfills	31
3.3 Uncertainties Associated with Fate and Transport of Lead	35
3.4 Numerical Stability of the Population in the Tail of the Peak Receptor Well Concentration
Distribution	36
4.0 SUMMARY	39
5.0 REFERENCES	41
APPENDIX A:	FREQUENCY DISTRIBUTION AND BOX PLOTS OF KEY INPUT
PARAMETERS
APPENDIX B:	NUMERICAL STABILITY OF THE TAIL ANALYSIS PLOTS
APPENDIX C:	ESTIMATES FOR DISPOSAL OF CONSTRUCTION AND DEMOLITION
WASTE
APPENDIX D:	LEAD BASED PAINT WASTE (DEBRIS) DISPOSAL
i

-------
LIST OF TABLES
	Page
Table 2.1 EPACMTP Modeling Options for LBP Analysis	 3
Table 2.2 Frequency Distribution of Receptor Well Distance	 6
Table 2.4 Frequency Distribution of C&D Landfill Area	 9
Table 2.5 Frequency Distribution of Municipal Landfill Area 	10
Table 2.6 Quantities disposed of in C&D landfills (tons/yr)	12
Table 2.7 Total, TCLP and SPLP concentrations of Lead in LBP debris (from SAIC, 1994) .. 16
Table 2.8 Cumulative Frequency Distribution of SPLP Leaching Concentration of LBP Debris
	18
Table 2.9 Cumulative Frequency Distribution of TCLP Leaching Concentration of LBP Debris . 19
Table 3.1 Cumulative Distribution of Peak Receptor Well Concentration of Lead in LBP Abatement
Debris Managed in C & D Landfills	23
Table 3.2 Probability Distribution of Arrival Time(within 10,000 y) of the Peak Receptor
Concentration of Lead in LBP Abatement Debris Managed in C & D landfills	23
Table 3.3 Frequency Distribution of the Peak Receptor Well Concentration of Lead in LBP
Abatement Debris Managed in C&D Landfills	25
Table 3.4 Frequency Distribution of Peak Receptor Well Concentrations of Lead which Exceed
Action Level (0.015 mg/L) for LBP Abatement Debris in C& D Landfills	28
Table 3.5 Frequency Distribution of Arrival Time of the Peak Well Concentrations of Lead
Exceeding Action Level (0.015 mg/L) for LBP Abatement Debris in C&D Landfills.
	28
Table 3.6 Probability Distribution of the peak Receptor Well Concentration of Lead for LBP
Abatement Debris Plus Painted Demolition Debris in C&D Landfills	29
Table 3.7 Probability Distribution of Arrival Time (within 10,000 y) of the Peak Receptor
Concentration of Lead in LBP Abatement Debris Plus Painted Demolition Debris in C&D
landfills	30
Table 3.8 Frequency Distribution of the Arrival Time of the Peak Well Concentrations of Lead
Exceeding Lead Action Level for LBP Abatement Debris plus Painted Demolition Debris
in C&D Landfills	30
Table 3.9 Frequency Distribution of the Peak Well Concentrations Exceeding Lead Action Level
(0.015 mg/L) for LBP Abatement Debris Plus Painted Demolition Debris in C&D
Landfills	31
Table 3.10 Frequency Distribution of the Peak Receptor Well Concentration of Lead in LBP
Abatement Debris Plus Painted Demolition Debris in C&D Landfills	31
Table 3.11 Probability Distribution of the peak Receptor Well Concentration of Lead in LBP
Abatement Debris Plus Painted Demolition Debris in Municipal Landfills	32
Table 3.12 Probability Distribution of Arrival Time (within 10,000 y) of the Peak Receptor
Concentration for Lead Abatement Debris Plus Painted demolition debris in Municipal
landfills	33
Table 3.13 Frequency Distribution of Arrival Time of the Peak Well Concentrations of Lead
Exceeding the Action Level for LBP Abatement Debris plus Painted Demolition Debris
in Municipal Landfills	33
li

-------
Frequency Distribution of f the Peak Well Concentration of Lead Exceeding the Action
Level for Lead Abatement Debris Plus Painted Demolition Debris in Municipal Landfills
	34
Frequency Distribution of the Peak Receptor Well Concentration of Lead in LBP
Abatement Debris Plus Painted Demolition Debris in Municipal Landfills	34
Variation of Mean Well Concentration (mg/L) and Standard Deviation with Number of
Iterations for Municipal Landfills	37
Variation of Mean Well Concentration in (mg/L) and Standard Deviation of Well
Concentrations for Construction and Demolition Landfills	38
iii

-------
LIST OF FIGURES
Page
Figure 2.1 Sample lead apparent partition coefficient (Kd) distribution with dissolved phase
concentration		7
Table 2.3 Modeling Scenarios for Lead Based Paint (LBP) Debris		8
Figure 2.2 Frequency Distribution of LBP Debris SPLP Leaching Concentration	20
Figure 2.3 Frequency Distribution of LBP Debris TCLP Leaching Concentration	20
Figure 3.2 Frequency Distribution of the Peak Receptor Well Concentrations which Exceed Lead
Action Level (0.015 mg/L) for LBP Abatement Debris in C&D Landfills	26
Figure 3.3 Frequency Distribution of Arrival Time of the Peak Receptor Well Concentrations of Lead
Exceeding the Action Level (0.015 mg/L) for LBP Abatement Debris in C& D Landfills.
27
iv

-------
1.0 INTRODUCTION
A Monte Carlo modeling analysis was performed to assess the potential groundwater exposure due
to lead associated with disposal of Lead Based Paint (LBP) debris managed in construction and demolition
landfills ( C & D) and municipal landfill waste management units. The modeling analysis was performed
using the EPA's Composite Model for Leachate Migration with Transformation Products (EPACMTP;
USEPA, 1995 a, b, c, and e ). EPACMTP was selected for the analyses based on the following
capabilities:
•	Capability to perform a full, Monte Carlo-based, probabilistic exposure assessment.
•	Utilization of a site-based, regional approach which incorporates EPA survey data on
various types of waste management units which directly accounts for physical
dependencies between various input parameters.
•	Capability to accommodate finite source as well as continuous source conditions.
•	Capability to accommodate chemical specific fate processes, including sorption,
hydrolysis, and formation of (toxic) daughter products.
•	Capability to incorporate geochemical effects on subsurface migration of lead through
linkage with EPA's MINTEQA2 (Allison at al. 1991) metals speciation model.
EPACMTP has been designed for Monte Carlo groundwater exposure assessments. The model
incorporates default probability distributions for the source, climatic and hydrogeologic parameters needed
by the fate and transport model. In order to model the fate and transport of metals, including lead, a
linkage has been developed between EPACMTP and the EPA's MINTEQA2, a geochemical speciation
model. The subsurface mobility of metals is influenced by major geochemical variables (such as pH,
amorphous iron, natural organic matter content and organic matter in the leachate) which control speciation
sorption and solubility of metals species. The linkage with MINTEQA2 allows the impact of these
geochemical conditions to be incorporated into the EPACMTP modeling analysis.
This document describes the application of EPACMTP to model the groundwater impact of lead
based paint containing in architectural debris managed in C & D and municipal landfills. Section 2
describes the modeling approach and data sources used. Section 3 presents the results of the fate and
transport modeling. Numerical stability of the Monte Carlo analysis output (receptor well concentrations)
is also address in section 3. A summary of the analysis is presented in Section 4 and references are provided
in Section 5.
1

-------
2.0
MODELING APPROACH AND DATA SOURCES
2.1 Modeling Approach
The EPACMTP modeling approach for the LBP groundwater pathway analysis is summarized in
Table 2.1. The modeling analysis was conducted in finite source, Monte Carlo mode for a C&D landfill
waste management scenario. As an alternative, modeling analysis was also conducted for a municipal
landfill waste management scenario. The groundwater fate and transport model was used to predict
groundwater exposure concentration at a receptor located downgradient side of the landfill within a radius
of one mile. The exposure concentration was taken to be the peak receptor well concentration occurring
within 10,000 years following the initial release from the waste unit. The Monte Carlo fate and transport
simulation provides a probability distribution of receptor well concentrations which can be used to
determine the likelihood that a given exposure level will be reached (or exceeded).
Table 2.1 lists the methodology and data sources used to obtain values for the source-specific
parameters, chemical-specific parameters, unsaturated and saturated zone parameters, and receptor well
location parameters. All parameters are in principle described by probability distributions. The
determination of the source related parameters for the LBP debris modeling analysis is discussed in section
2.2. Probability distributions for other model input parameters are presented in the EPACMTP
background documents (USEPA, 1997a, 1996 a,b, c, and d). Key aspects of the modeling approach are
discussed below.
EPACMTP simulates the subsurface fate and transport of individual contaminants in the leachate
emanating from the base of a waste management unit. The model does not attempt to account for the
processes occurring inside the waste unit itself, except for the following: The leachate generation rate was
determined using the Hydrologic Evaluation of Landfills Program (HELP) model (Schroeder, 1994) based
on a Subtitle D landfill with a 2-foot earthen cover with grass vegetation cover, but with no liner or
leachate collection system present (USEPA, 1995-a). Given information on the total amount of waste
placed in the landfill, EPACMTP will compute the time duration of the leachate pulse using straight-
forward mass-balance principles. The model can handle either the case of a monofill, or of co-disposal
of multiple wastes. In the latter case, the model accounts for the fact that the waste of concern occupies
only a fraction of the landfill. The model however does not consider interactions among, or the combined
effects of, multiple waste streams. In this case, the LBP debris was co-disposed with other C&D waste in
C&D landfill scenario and with municipal waste in a municipal landfill scenario.
In the EPACMTP Monte Carlo modeling approach, the climatic and hydrogeological model input
parameters are assigned values based on the geographical locations of landfill sites across the U.S. This
approach preserves the interdependence between site location and the climatic and hydrogeological
properties of the region where it is located. The waste management unit characteristics such as
geographical location, unit area, depth and volume were obtained in a telephone survey of industrial
Subtitle D waste management units conducted by USEPA in 1986. The information obtained in the survey
along with climatic and hydrogeological properties of the waste management units are presented in a
report (EPA 1996). In the LBP modeling analysis, the existing EPACMTP relations between climatic and
hydrogeological regions for industrial Subtitle D landfills were used. The underlying assumption in using
these relationships is that, in general, the overall distributions of C&D and municipal landfill sites are the
same as the industrial Subtitle D landfills. In the modeling analysis, the receptor well was located
anywhere down-gradient from the landfill, within one mile from the waste management unit.
2

-------
Table 2.1 EPACMTP Modeling Options for LBP Analysis
Management Scenarios:
C&D landfill, alternatively municipal landfills
Modeling Scenario:
Monte Carlo; 10,000 iterations with constant concentration pulse
source.
Exposure evaluation:
Down gradient groundwater receptor well; peak well concentration
within 10,000 year exposure time limit.
Source Parameters:
Waste Unit Area:
Waste Stream Volume:
Landfill Depth:
Volume Fraction LBP debris
Infiltration Rate:
From Report to Congress (EPA, 1985)
Appendices C and D.
Calculated Section 2.3
Calculated Section 2.3.
Site-based, derived from water balance using HELP model
(Schroeder, 1994).
Leaching Duration
Derived, continues until all constituent has leaches out.
Chemical Specific Parameters:
Decay Rate:
No decay (metal)
Sorption:
MINTEQA2 sorption isotherm
Unsaturated Zone Parameters:
Depth to groundwater:
Soil Hydraulic Parameters:
Fraction Organic Carbon:
Bulk Density:
Site-based, from API/USGS hydrogeologic database (API, 1989;
Heath, 1984).
ORD data based on national distribution of three soil types (sandy
loam, silt loam, silty clay loam)
ORD data based on national distribution of three soil types (sandy
loam, silt loam, silty clay loam)
ORD data based on national distribution of three soil types (sandy
loam, silt loam, silty clay loam).
3

-------
Table 2.1 EPACMTP Modeling Options for LBP Analysis (continued)
Saturated Zone Parameters:
Recharge Rate:
Saturated Thickness:
Hydraulic Conductivity:
Porosity:
Bulk Density:
Dispersivity:
Groundwater Temperature:
Fraction Organic Carbon:
PH
Site-based, derived from regional precipitation/evaporation and soil
type
Site-based, from API/USGS (API, 1989; Heath, 1984).
hydrogeologic database
EPA Storet Database, Effective porosity derived from national
distribution of aquifer particle diameter
Derived from porosity
Derived from distance to receptor well based on Gelhar's
distribution of field scale dispersivity ( EPA 1997a)
Site-based, from USGS regional temperature map
National distribution, from EPA STORET database
National distribution, from EPA STORET database
Receptor Well Location:
X-distance
Y-distance
Depth of Intake Point
Empirical distribution within 0-1 mile from waste unit
Uniform within 1 mile downgradient radius
Uniform throughout saturated thickness of aquifer
4

-------
The (radial) distance between the receptor well and the down-gradient side of the landfill is given by an
empirical probability distribution (Table 2.2), based upon reported distances between Subtitle D municipal
landfills and the nearest downgradient domestic drinking water well. Table 2.2 indicates a median well
distance of about one-quarter mile (427 m). The vertical position of the well intake point (z-direction) was
taken to be uniform throughout the saturated thickness of the aquifer.
Fate and transport of metals such as lead in the subsurface is influenced by complex geochemical
interactions. Deutsch (1997) provides a review of lead geochemistry and summarized some of these
studies. EPA has also several papers discussing the issues involved in subsurface lead transport (USEPA,
1989, 1990, 1991 and 1992). To account for these processes, the OSW has developed and implemented
a modeling approach which utilizes the MINTEQA2 metals speciation model in conjunction with the
EPACMTP subsurface fate and transport model. The MINTEQA2 model has been applied to generate
effective sorption isotherms reflecting variations in four geochemical master variables affecting metals fate
and transport. These factors are: pH, leachate organic matter, natural organic matter in the soil or
aquifer, and iron hydroxide content. Each of these parameters has a range of values, reflecting their
nationwide probability distributions (USEPA, 1995 d). In addition, thirteen other geochemical constituents
were identified as second type parameters which commonly occur in groundwater at concentrations great
enough to warrant inclusion in the general background chemistry of the MINTEQA2 geochemical
speciation modeling.
MINTEQA2 was used to generate a family of effective sorption isotherms (USEPA, 1995d),
reflecting the variations and combinations of the four geochemical master variables. A sorption isotherm,
by definition, is a plot of the sorbed phase concentration versus the solution phase concentration.
MINTEQA2 generates the sorption isotherms in tabular form for various combinations of the four master
variables and for both unsaturated and saturated zones. During each realization of the EPACMTP Monte
Carlo simulation, one isotherm is selected at random from the set of isotherms for the metal being
analyzed. In this manner, the variability in mobility of a metal which results from the nationwide variation
in subsurface geochemical conditions, is incorporated into the Monte Carlo analysis.
The MINTEQA2 derived isotherms are generally nonlinear, i.e., the apparent partition coefficient
between the dissolved phase and the soil or aquifer solid phase varies with concentration. Apparent
partition coefficient is a ratio of sorbed phase concentration over dissolved phase concentration. To handle
this condition (kj), the unsaturated zone transport module of EPACMTP was modified to incorporate a
method-of-characteristics based solution which handles even highly nonlinear isotherms very efficiently.
The isotherms generated by MINTEQA2 exhibit near-linear behavior at low concentration values, and
increasing nonlinearity at higher concentrations. Accurate modeling of the nonlinear sorption is therefore
most important close to the leachate source, i.e., in the unsaturated zone underneath the waste unit.
Because concentrations diminish with travel distance, and the contaminants are diluted in the ambient
groundwater upon entry in the saturated zone, EPACMTP models nonlinear sorption only in the
unsaturated zone. Once the leachate reaches the watertable and mixes with the ambient groundwater,
concentrations will be in a much more dilute range, in which the isotherms generally are close to linear.
Saturated zone transport is therefore modeled using a linear isotherm, with a k(, value selected based on
the groundwater concentration underneath the waste unit, predicted by the model.
5

-------
A sample plot of lead apparent partition coefficient distribution with dissolved phase concentration
used in EPACMTP is shown in Figure 2.1. The figure depicts the dependence of the partition coefficient
(kd) upon the lead concentration. The figure illustrates a number of the key features of lead sorption
behavior. The isotherm shows the high degree of non-linearity, with a greater than 3-orders-of-magnitude
variation in k^, for concentrations greater than 106 mg/L. Secondly, the figure indicates the high values
of kd; at a concentration of 1 mg/L, the k d still exceeds 1000 L/kg. This behavior is typical for lead which
is a strongly sorbed metal, except under low pH conditions. These high kj values result in long subsurface
travel times and pronounced attenuation of concentration values, because much of the contaminant mass
in the soil and groundwater is held on the solid phase.
Table 2.2 Frequency Distribution of Receptor Well Distance
Distance (m)
Cumulative Frequency
0.0
0.00
0.6
0.00
13.7
0.03
19.8
0.04
45.7
0.05
104
0.10
152
0.15
183
0.20
244
0.25
305
0.30
305
0.35
366
0.40
427
0.50
610
0.60
805
0.70
914
0.80
1160
0.85
1220
0.90
1370
0.95
1520
0.98
1610
1.00
6

-------
1 .0 E+07
1 .0 E+06
1 .0 E+05
1 .0 E+04
1 .0 E+03
1.0E-1 2
1.0 E-1 0
1 .0 E-0 8
1 .0 E-06
1,0E -04
1.0E-02
1 .0 E+0 0
1 .OE +02
Dissolved Conc.(mg/L)
Figure 2.1 Samjie lead apparent partition coefficient (Kd) distribution with dissolved phase
concentration.
7

-------
2.2 Modeling Scenarios for Lead Based Painted (LBP) Debris
The groundwater modeling analysis for LBP abatement debris plus painted demolition debris was
performed considering two waste management scenarios; Construction and Demolition (C& D) landfills
and Municipal Solid Waste Landfills (MSWLF), and two types of LBP debris; abatement and abatement
plus painted demolition. A total 3 scenarios were modeled as summarized in Table 2.3.
Table 2.3 Modeling Scenarios for Lead Based Paint (LBP) Debris
LBP Debris Description
C&D Landfills
Municipal
LBP Abatement
X
O
LBP Abatement + Painted Demolition
X
X
X - Modeled
O - Not modeled
2.3 Source Related Parameters
EPACMTP requires specification of the waste source area, the leachate concentration emanating
from the base of the waste source, and the duration of the leachate pulse. The first two parameters are
ertered directly as input parameters to the model. The leachate pulse duration, tp , is calculated based upon
the total amount of constituent in the landfill and the rate of leaching. The methodology is presented
briefly below, followed by a discussion of how the various parameters were determined for the LBP
analysis.
The duration of the leaching period is calculated in EPACMTP based upon elementary mass-balance
considerations (USEPA, 1996 c). The following relationship is used:
A'd¦ Fhw- Pw- Cw - A-1 CL- tp	(i)
where
A
Waste unit area (m2)
d
Waste unit depth (m)
F„w
Volume fraction of waste in the unit
Pw
Waste density (kg/L)
cw
Waste concentration (mg/kg)
CL
Leachate concentration (mg/L)
8

-------
I = Infiltration rate (m/y)
tp = Leaching duration (y)
The left-hand side of (1) represents the total amount of constituent mass in the waste management
unit; the right-hand side represents the mass that has been removed by leaching over the time period tp.
The formulation of (1) tacitly assumes that the leachate concentration, CL, remains constant over the
leaching period tp, and that there are no mechanisms of removal other than leaching. EPACMTP
alternatively can accommodate a gradual reduction in leachate concentration to represent source depletion
(USEPA, 1996 b). However, this option was not used for the present analysis as the case of a constant
leaching concentration is considered more appropriate for metals (USEPA, 1996 d). Equation (1) can be
rewritten as
A- d- F, PC
j.	hw ww
''	JTq	®
The waste source area, A, cancels in the above equation. This parameter is however still used
elsewhere in the EPACMTP data input. The infiltration rate, /, is assigned values based on the nationwide
OSW modeling approach for industrial landfills as described above. The remaining parameters in Eq. (2),
which are needed, are the landfill depth, d, the fraction of the landfill volume occupied by LBP debris,
Fhw, the density of the waste, the total concentration of lead in LBP debris, Cw and the lead leachate
concentration, CL. The determination of these parameters is presented in the following sections.
Landfill Area
Data on the area of C&D landfills was obtained from the 1988 EPA Report (EPA 1988) to
Congress on Solid Waste Disposal in the United States (EPA, 1988; Table 4-5). This table presents the
data for Demolition Debris landfills. This report provides an overall breakdown of landfill acreage into
categories of less than 10, 10 to 100, and greater than 100 acres. Lower and upper limits of 0.1 and 250
acres, respectively, were assigned to the waste unit area in the modeling analysis. The upper limit of 250
acres (approximately 106 m2) was selected based on the fact that fewer than 1% of Industrial Subtitle D
landfills exceed this size (USEPA, 1995-a). The resulting frequency distribution of landfill area used in
the EPACMTP analysis is shown in Table 2.4.
Table 2.4 Frequency Distribution of C&D Landfill Area
acres
Area
in2
Cumulative
Frequency
0.1

404.7
0.0
10.0

40,470
0.606
100.0

404,700
0.970
250.0

1,012,000
1.00
9

-------
As an alternative, risk exposure associated with the disposal of lead based paint in municipal
landfills was also evaluated. Data on the area of municipal landfills were obtained from a U.S. EPA report
on national survey of solid waste (municipal) landfill facilities (USEPA, 1988). According to this report
there are 6034 municipal landfills. The frequency distribution of the municipal landfill area is shown in
Table 2.5.
Table 2.5 Frequency Distribution of Municipal Landfill Area
Area
Cumulative
Frequency
acres
III2
0.99
4006.5
0.0
2.0
8094.0
0.1
5.0
20235.0
0.25
15.0
60705.0
0.5
48.0
194256.0
0.75
104.0
420888.0
0.90
2310.0
9348570.0
1.00
2.4 Landfill Depth and Waste Quantity
This section describes the derivation of the quantities of C&D waste and LBP debris disposed in
landfills. Section 2.3.1 provides the estimated waste quantities based on EPA's estimate of the amount of
LBP debris generated under lead abatement programs. Section 2.3.2 provides alternative and more
conservative, i.e. higher waste amounts, estimates which include abatement and painted demolition debris.
2.4.1 Waste Quantities Estimated from Lead Abatement Programs
The annual loading of construction and demolition, including Removal and Renovation (R&R),
waste in C&D landfills is estimated as 16.24xl06 tons/year, comprised of 11.8xl06 tons/yr of demolition
waste, and 4.44xl06 tons/yr of construction waste as shown in appendix C. The amount of LBP abatement
debris generated under lead abatement programs is estimated as a total of 19.1x10s tons over the next 34
years. This estimate is derived as shown in appendix and summarized below:
1. Total LBP debris from abatement activities:
Public
Private
Child - occup.
1.4 million units x 1.55 tons/unit
38.6 million units
6.4 million units of children x 2.60 tons/house
(1 out of 6 homes have a child)
family 118,000 x 1.55 tons/house
daycare 6,900 x 15.99 tons/ center
2.17 million tons
16.64 million tons
0.183 million tons
0.110 million tons
19.1 million tons
10

-------
2.
Annual quantities of LBP abatement debris:
-	pre-regulatory changes	= 514,000 tons
-	post-regulatory changes	= 562,000 tons
(assumed 10% overall additional abatement)
Conclusion: at a constant waste generation rate of 562,000 tons per year, all abatements are likely to be
completed in 34 years.
There are approximately 1800 C&D landfills in the US (ICF, 1995). Assuming a 50-year life of
the landfill and the C&D waste disposal rate of 16.24 106 tons/year (see above), the total amount of waste
in all C&D landfills can be calculated as (50 yrs) x (16.24xl06 tons/yr) = 8.12xl08 tons. The dominant
components of C&D waste mass are concrete and asphalt (ICF, 1995). For the present analysis, an
average density of 1.5 short tons/yd3 (= 1779 kg/m3)1 was used for C&D waste, thus, the waste mass of
8.12xl08 tons thus corresponds to a waste volume of
8.12 x 108 tons x 90? kg!ton m ^ ^ x jq8
1779 hg!m%
From the available information on number of C&D landfills, the area distribution, and the total
\dume of C&D waste, an average depth of C&D landfills was calculated. The aggregate area of all C&D
landfills was estimated from the data in Table 2.3, as follows: The landfill areas within each frequency
interval in Table 2.3 were taken to be uniformly distributed, with an average area equal to the midpoint
area of each interval. For example, within the first frequency interval, there are 0.606 x 1800 = 1091
landfills, with an average area of 0.5 x (404.7 + 40,470) = 20,437 m2. The total area of landfills in this
interval is calculated as 1091 x 20,437 = 22,297,149 m2. The number of landfills and total area in each
interval were calculated in this manner, and then added together to yield an estimated aggregate area of
all C&D landfills of 2.06xl08 m2. Next, the average landfill depth is calculated as 2.01 m (ratio of waste
volume 4.14 x 108 to area 2.06 x 108).
The volume fraction of C&D waste that is LBP abatement debris is estimated from the ratio of the
total\dume of C&D waste in a landfill to the LBP abatement waste volume, assuming one half of all C&D
landfills receive LBP abatement waste (900 LBP landfills). The mass of LBP debris is converted to a
waste volume assuming a density of 1.0 tons/yd3 (= 1186 kg/m3). LBP abatement debris consists primarily
of wood materials (doors, windows, etc), and it is therefore appropriate to use a lower density than for
bulk C&D waste. The total amount of LBP abatement debris produced is thus equal to:
1 1 short ton = 907.2 kg; 1 yd3 = 0.765 m3
11

-------
19.lxlO6 tons x 907 kg!ton _ i4gxio7/n3
1186 kgliri3.
In the present analysis, it is assumed conservatively that the LBP abatement debris is distributed
among one half of total of 1800 C&D landfills; the aggregate landfill volume is:
4.14 x 108	. 2.07 x 108/n3
1800
The LBP abatement debris volume represents (1.46xl07) h- (2.07x108) x 100 = 7.1% of the
landfill volume. It was assumed for the present worst case analysis that both the landfill depth and the
volume fraction of LBP abatement debris are the same in all C&D landfills that receive the waste. This
assumption implies that the actual amount of LBP abatement debris in each landfill is proportional to the
total volume ( = area x depth) of that landfill.
2.4.2 Waste Quantities Including Painted Demolition Debris
Two alternative waste management scenarios were modeled. In the first scenario, the waste was
assumed to be disposed in C&D landfills. Whereas, in the second senario the waste was assumed to be
disposed in municipal landfills. The estimate of the LBP debris (including R&R debris) were also obtained
based on two disposal scenarios: (1) before year 2010 and (2) after 2010; assuming that some of the LBP
debris would be recycled and reused (Appendix C). The estimation of waste volumes and effective waste
depths are discussed below.
2.4.2.1 I,BP Debris Disposed in C&D Landfills
The waste quantities managed in Construction and Demolition (C&D) landfills are in Table 2.6.
Table 2.6 Quantities disposed of in C&D landfills (tons/yr)

Before 2010
After 2010
C&D Debris
31 M
18 M
Painted demolition debris
0.83 M
0.83 M
Abatement debris
0.56 M
0.34 M
Total
32.4 M
19.2 M
Source: Appendix C
Using 1995 as the base year and assuming a 50-year life of a C&D landfill, as in Section 2.3.1,
the total amount of landfilled waste was calculated as shown below:
12

-------
(15 yrs x 32.4 x 106 tons/yr) + (35 yrs x 19.2 x 106 tons/yr) = 1.2 x 109 tons
Assuming an overall density of C&D waste of 1.5 tons/yd3, this C&D waste quantity corresponds to a
volume of
1.2 x 109 tons x kg I ton _ g ^ ^ 108 m3
1779 kglnr1
Using the same aggregate C&D landfill area of 2.06 108 m2 calculated in the previous section, the average
C&D landfill depth is
6 04 * 108 - 2.93 m
2.06 x 108
Consistent with the previous section, it is assumed that LBP debris is generated for a total of 34
years. The total quantity of LBP debris disposed in landfills is therefore equal to
(l5 yrs x (0.88 x 106 + 0.53 x 106 tons/yr^ + (l9 yrs x (0.88 x 106 + 0.34 x 106 tons/yr^
- 21.2 x 106 + 23.2 106 - 44.3 x 106 tons
Using an LBP debris density of 1.0 tons/yd3, the LBP debris quantity has a volume of
44.3 x 106 x Q07¥ton - 3.39 x 107 m3
1186 kg/m3
Assuming, as before, that the LBP debris is disposed in half of the total 1800 C&D landfills, the average
volume fraction of LBP debris in the landfills that receive the waste is
3.39x107 m3 1800 ni1_
	 x	 - 0.112
6.04 x 108 m3 900
Compared to the waste amounts presented in Section 2.3.1, the above estimates indicate both a
greater amount of C&D waste per landfill, as well as an increased proportion of LBP debris per landfill.
The greater amount of LBP debris per landfill translates into a proportionally longer duration of the
leachate pulse.
13

-------
2.4.2.2 Waste Disposed in Municipal Landfills
From the available information on number of municipal landfills, the area distribution and waste
\dume, an effective waste depth of municipal landfills was calculated. The aggregate area of all municipal
landfills was estimated from the data in Table 2.4, as follows: The landfill areas within each frequency
interval in Table 2.4 were taken to be uniformly distributed, with an average area equal to the midpoint
area of each interval. For example, within the first frequency interval, there are 0.1 x 6034 = 603
landfills, with an average area of 0.5 x (4006.5 + 8094) = 6050 m2. The total area in this interval is
calculated as 603 x 6050 = 3650729.9 m2. The number of landfills and total area in each interval were
calculated in this manner, and then added together to yield an estimated aggregate area of all municipal
landfills of 3.5xl09 m2. Next, the effective waste depth is calculated as 9.7E-3 m (ratio of waste volume
3.39 x 107 to area 2.06 x 108). The estimation of waste volume is discussed in the previous section. The
waste fraction was set 1.0 to maintain mass balance.
The effective waste depth is not the true landfill depth. It represents the portion of the true landfill
depth the LBP debris occupies. As discussed in section 2.2 , landfill depth is an input parameter in the
calculation of the source duration. Equation 2 can be rewritten as:
M ¦ C
t _ w w
p a- i a	('
where Mw, is the mass of the waste (A . d . F bw. P I, A . d is the volume of the landfill and F Js the
volume of the L.P. debris over the volume of the landfill. Therefore, by using a waste fraction of 1.0 and
an effective waste depth the mass could be conserved as show in equation (4).
Mw - A'—j^' 1* Pw	(4)
The equation simplifies to volume of the L.P. debris (VJ x the density of the waste (Pw).
2.5 Waste and Leachate Concentration
Information of the total and leaching concentrations of lead in LBP debris was obtained from
reported sampling and analysis data of LBP debris, reported in the Background Document for the Lead
Abatement Waste Study (SAIC, 1994). This report presents total lead concentrations, TCLP (Toxicity
Characteristic Leaching Procedure) and SPLP (Synthetic Process Leaching Procedure) leaching
concentrations in various types of LBP debris. The data are presented in Table 2.7. In LBP, lead exists
in a variety of resin formulations that would tend to encapsulate it and render it relatively unreactive. It
is often difficult to determine the geochemical environment of a landfill without actually knowing all the
14

-------
wastes that are disposed at a site. The geochemistry of the landfill dictates the rate at which lead leaches
out. Therefore, in order to model the most plausible and realistic scenario, the lead leachate concentrations
reported by using SPLP and TCLP tests on actual waste samples were used as input in the case of C&D
and municipal landfills, respectively. In general, TCLP values are greater than SPLP values. SPLP is
more suitable in the case of nonmunicipal landfills because the environment in municipal landfills is
conducive in the generation of organic acid leachate similar to the acetic acid leachate used in the TCLP.
Since lead is more soluble in acidic leaching medium generated in the presence of organic wastes, TCLP
values in general, tend to be greater than SPLP values. Both SPLP and TCLP estimate the actual lead that
is released from the paint. The total lead content of the paint residue affects the estimate of the length of
time leaching may continue. Once lead leaches into groundwater, the groundwater chemistry dictates its
mobility. The variability of groundwater chemistry is simulated by the four master variables, as discussed
in section 2.1.
In order to obtain a representative weighting for the different materials that compose LBP debris,
the contributions of different substrates were converted to 'door equivalents'. It was assumed that the mass
of one door is equivalent to 5 windows, 5 door casings, or 42 linear feet of soffit. To calculate composite
percentages, all of the doors and 'door equivalents' were added, and the percentage contribution of each
substrate calculated. The following weighting was obtained in this manner:
Doors:
Soffits:
44%
41%
9%
5%
1%
Door casings:
Windows:
Shelves and misc.
15

-------
Table 2.7 Total, TCLP and SPLP concentrations of Lead in LBP debris (from SAIC, 1994)
Sample
Substrate
Total
TCLP
SPLP


(mg/kg)
(mg/L)
(mg/L)
EV-01
window
5.4
0.05
0.05
EV-02
window
34100
32.2
1.2
EV-03
window
3930
40.6
1.5
EV-04
window
12300
19.6
1.3
EV-05
door
58.4
0.25
0.05
EV-06
door
1370
0.22
0.05
EV-07
door
48.7
0.05
0.05
EV-08
door
2950
3.8
0.24
MIL-01
door
1900
7.6
0.4
MIL-02
door
2680
6.6
0.76
MIL-03
door
2250
7.4
0.92
MIL-04
door
2230
22
0.57
MIL-05
shelf
2720
34.6
2
MIL-06
shelf
235
0.85
0.05
MIL-07
window
4240
18.3
1.1
MIL-08
window
14700
19.5
1.4
MIL-09
window
1100
5.3
0.67
MIL-10
door casing
2250
59.1
13.9
MIL-11
door casing
7290
32.7
4.6
MIL-12
door casing
16100
17.3
0.77
MIL-13
door casing
12900
1.8
1.2
MIL-14
door casing
11100
1.8
1.4
MIL-15
window
2480
1.9
1.6
MIL-16
door casing
2600
0.21
0.18
MIL-17
door casing
4120
0.36
0.15
Mil-18
door casing
3840
2.6
4.1
Mil-19
soffit
7950
9.3
1.8
MI1-20
soffit
10800
15.2
1.4
MI1-21
soffit
9710
28.7
3
MIL-22
soffit
25100
20.9
1.8
BALT-01
int. trim
58000
143
7.2
BALT-02
baseboard
17600
65.1
8.3
BALT-03
baseboard
12300
36.7
3
BALT-04
window
51500
53.3
6.6
SF-01
ext. wood
2010
3
0.39
SF-02
ext. wood
10900
72.8
6.5
SF-03
int. wood
1430
0.25
0.05
SF-04
int. trim
423
3
0.14
AL-01
int. wood
13800
18.4
1.2
AL-02
tongue & gr.
5080
32.7
12
AL-03
plaster
4100
0.73
0.05
AL-04
fence
31.8
0.05
0.05
16

-------
Table 2.7 Total, TCLP and SPLP concentrations of Lead in LBP debris (from SAIC, 1994)
(continued)
Sample
Substrate
Total
TCLP
SPLP


(mg/kg)
(mg/L)
(mg/L)
AL-05
door
16400
31.4
3.4
AL-06
door
4330
12.3
1.6
AL-07
int trim
6250
22.6
9.3
AL-08
door
5980
29.5
3.9
AL-09
door
3770
27
0.05
The actual leaching concentration emanating from C&D landfills is uncertain, due to a variety of
factors, including variations in the composition of LBP debris and variations in the lead content of
individual waste components. The present modeling analysis attempted to capture this variation by
treating the leaching concentration, and the average total LBP debris lead concentration as random
parameters. A frequency distribution of the leaching concentration was generated from the data in Table
2.7 in the following manner: It was assumed that the relative contributions of each of the substrate
categories in table are the same in each case, but that the leaching concentration within each substrate
category are variable. Using a bootstrap sampling procedure, i.e., random sampling with replacement,
2000 random values of LBP debris leaching concentration were generated. The 2000 values were taken
to represent the nationwide frequency distribution of the lead leaching concentration. In each of the 2000
realizations, one random value of the SPLP leaching or TCLP concentrations presented in Table 2.7 was
drawn for each substrate category (one value for doors, one value for soffits, etc.). A weighted average
of these values was computed by using the weights assigned for each substrate category. The resulting
frequency distribution of LBP debris leaching concentration is presented in Tables 2.8 and 2.9 and depicted
in Figures 2.2 and 2.3.
17

-------
Table 2.8 Cumulative Frequency Distribution of SPLP Leaching Concentration of LBP Debris
Leaching Concentration (mg/L)
Cumulative Probability
0.591
0.0
0.783
0.05
0.866
0.10
0.930
0.15
0.986
0.20
1.063
0.25
1.144
0.30
1.215
0.35
1.280
0.40
1.350
0.45
1.422
0.50
1.510
0.55
1.624
0.60
1.743
0.65
1.918
0.70
2.107
0.75
2.302
0.80
2.487
0.85
2.666
0.90
2.961
0.95
3.616
0.99
4.107
1.00
18

-------
Table 2.9 Cumulative Frequency Distribution of TCLP Leaching Concentration of LBP Debris
Leaching Concentration (mg/L)
Cumulative Probability
3.90
0.0
6.81
0.05
8.00
0.10
9.09
0.15
10.07
0.20
10.93
0.25
11.87
0.30
12.60
0.35
13.46
0.40
14.34
0.45
15.33
0.50
16.21
0.55
17.06
0.60
18.01
0.65
18.96
0.70
20.14
0.75
21.22
0.80
22.50
0.85
24.27
0.90
26.21
0.95
29.40
0.99
33.25
1.00
19

-------
Q-1
D.DS
o —
0.6 *	a 2.6 3 3.5 4 4L6
I mmrftmfm tZoncmnti mtfon fmg/L)

III
1.


Figure 2.2 Frequency Distribution of LBP Debris SPLP Leaching
Concentration.
0.3
0.25
0.2
>
o
c
o
S 0.15
O"
d)
£ 0,
0.05
-+-

-+-

5 10 15 20 25 30 35
Leachate Concentration (mg/L)
Figure 2.3 Frequency Distribution of LBP Debris TCLP Leaching
Concentration.
20

-------
For the modeling analysis of LBP debris disposed in C&D and municipal landfills, it was assumed
that the total lead concentration in the LBP debris varies proportionally to the leaching concentration, with
a constant ratio of waste-to-leaching concentration. This ratio was calculated from the ratio of the
weighted average waste concentration in Table 2.5, to the weighted average leaching concentration. In
the case of SPLP the ratio is 4997 and in the case of TCLP it is 509.
21

-------
3.0 RESULTS
This section presents results of the groundwater modeling. Section 3.1 presents the results based
on the waste quantity estimates for lead abatement debris as described in Section 2.3.1. The results of the
analysis for combined LBP abatement debris and painted demolition debris are presented in Section 3.2.1.
Section 3.2.2 addresses the risks associated with the combined lead abatement debris and painted
demolition debris managed in municipal landfills. The municipal landfill scenario was investigated as an
alternative way of managing wastes containing LBP debris. Section 3.3 addresses uncertainties in the fate
and transport of lead and Section 3.4 discusses numerical stability of EPACMTP Monte Carlo
concentration populations under the tail region of the concentration distribution. Results of the analysis are
summarized in Section 4.0.
3.1 Results Based on LBP Abatement Debris in C&D Landfills
Results of the groundwater pathway analysis for lead using LBP abatement debris quantity
estimates are summarized in Tables 3.1 - 3.5 and Figures 3.1 - 3.3. These results are based on a
simulation run comprising 10,000 Monte Carlo realizations. Table 3.1 show the cumulative distribution
of the groundwater exposure concentrations of lead obtained from the EPACMTP Monte Carlo analysis.
Only the upper 20 percentile values are shown in this table. The results showed that the lead in
groundwater exceeded the Federal Safe Drinking Water Action Level of 0.015 mg/L for tap water in about
4.5% of the cases. The results also indicated that concentrations at the receptor well were 1.00 E-10 or
lower in 80% of the cases. These low concentrations are due to the fact that the peak concentration of lead
did not reached the well within the allowed 10,000 year time frame in more than 70% of the Monte Carlo
realizations. This is shown in Table 3.2 which presents the cumulative frequency distribution of the arrival
times of the peak receptor well concentrations. Table 3.2 shows that the peak receptor well concentration
was reached within 1,000 years in less than 1% of the cases and that the arrival time exceeds 10,000 years
in about 70% of the Monte Carlo realizations. The shortest travel time in the 10,000 Monte Carlo runs
was on the order of 112 years. This behavior was due to strong sorption of lead in the both unsaturated
and saturated zones, which greatly retards the movement of the constituent and, thus, reduced the peak
receptor well concentrations.
Figure 3.1 and Table 3.3 present the frequency distribution of peak receptor well concentration
values within the 10,000 year exposure time horizon. The peak concentration did not exceed 0.005 mg/L
(one-third of the 0.015 mg/L, the safe drinking water action level for tap water) in nearly 95% of the
cases The action level (o.ol5 mg/L) itself was exceeded in only 4.4% of the cases. The highest peak
receptor well values encountered in the 10,000 realizations was 2.0 mg/L.
A more detailed analysis of those cases in which the 0.015 mg/L level was exceeded is presented
in Figures 3.2 and 3.3 and Tables 3.4 and 3.5. Figure 3.2 and Table 3.4 show the frequency distribution
of the 4.4% of the peak receptor well concentrations which exceed the action level for lead. Figure 3.3
and Table 3.5 present the arrival time distribution of the peak receptor well concentrations which exceed
lead action level. It can be seen in Figure 3.3 and Table 3.5 that most of the exceedences occur after
5,000 or more years; the number of exceedences occurring within 2,000 years account for less than 0.2%
of all cases. Under the assumption that there are 900 landfills receiving LBP debris, this corresponds to
less than 2 cases nationwide in which the peak receptor well concentration of lead would exceed its action
level within 2,000 years from present date.
22

-------
Table 3.1 Cumulative Distribution of Peak Receptor Well Concentration of Lead in LBP
Abatement Debris Managed in C & D Landfills.
Cumulative Probability
Concentration
%
(mg/L)
80
1.00E-10
85
4.10E-09
90
3.80E-06
94
1.50E-03
95
5.20E-03
95.63
1.50E-02
96
2.60E-02
97
8.20E-02
98
1.97E-01
99
4.30E-01
100
2.10E + 00
Table 3.2 Probability Distribution of Arrival Time(within 10,000 y) of the Peak Receptor
Concentration of Lead in LBP Abatement Debris Managed in C & D landfills.
Cumulative Probability
Travel Time
%
(years)
0.01
112
1
1183
5
3678
10
5599
15
6419
20
7832
25
9285
29
9997
23

-------
100


90 ¦

94.95
80 ¦


70 '


60 1


50 ¦


40 ¦


30 ¦


20 1


10 ¦

0.41 0.27 0.24 064 0.73 1 95 0.57 0.24




0 -
0.005 - 0.010 - 0.015- 0.020 - 0.050 - 0.10 - 0.50 - 1.0-

0.005
0.010 0.015 0.020 0.050 .0.10 0.50 1.0 2.0


Peak Concentration (mg/L)
Figure 3.1 Frequency Distribution of Receptor Well Peak Concentration of Lead
in LBP Abatement Debris Managed in C & D Landfills.
24

-------
Table 3.3 Frequency Distribution of the Peak Receptor Well Concentration of Lead in LBP
Abatement Debris Managed in C&D Landfills.
Peak
Frequency
Concentration (mg/L)
(% of total)
0-0.005
94.95
0.005 - 0.010
0.41
0.010-0.015
0.27
0.015-0.020
0.24
0.020 - 0.050
0.64
0.050- 0.10
0.73
0.10-0.50
1.95
0.50- 1.0
0.57
1.0-2.0
0.24
25

-------
Frequency
Cumulative Frequency
Figure 3.2 Frequency Distribution of the Peak Receptor Well Concentrations which Exceed
Lead Action Level (0.015 mg/L) for LBP Abatement Debris in C&D Landfills.
26

-------
5
4
Frequency
Cumulative Frequency
3
2
1 .70
0.82
1
0.67
0
0 - 20 00
2 000 - 40 00
4 000 - 60 00
6000 - 8000
8000 - 10000
T ravel Tim e (y)
Figure 3.3 Frequency Distribution of Arrival Time of the Peak Receptor Well
Concentrations of Lead Exceeding the Action Level (0.015 mg/L) for LBP
Abatement Debris in C& D Landfills.
27

-------
Table 3.4 Frequency Distribution of Peak Receptor Well Concentrations of Lead which Exceed
Action Level (0.015 mg/L) for LBP Abatement Debris in C& D Landfills.
Peak
Frequency
Cumulative Frequency
Concentration (mg/L)
(% of total)
(% of total)
0.015-0.04
0.650
0.650
0.04 - 0.08
0.670
1.320
0.08-0.10
0.280
1.600
0.10-0.20
0.800
2.400
0.20-0.40
0.870
3.270
0.40-0.60
0.480
3.750
0.60-0.80
0.230
3.980
0.80- 1.0
0.140
4.120
1.0-2.0
0.240
4.360
Table 3.5 Frequency Distribution of Arrival Time of the Peak Well Concentrations of Lead
Exceeding Action Level (0.015 mg/L) for LBP Abatement Debris in C&D Landfills.
Travel
Frequency
Cumulative Frequency
Time
(% of total)
(% of total)
0 - 2000
0.18791
0.18791
2000 - 4000
1.00073
1.18864
4000 - 6000
0.66861
1.85725
6000 - 8000
0.81719
2.67444
8000 - 10000
1.7043
4.37
3.2 Results of the Analysis for Lead Abatement Debris Plus Painted Demolition Debris
The groundwater modeling analysis for LBP abatement debris plus painted demolition debris was
performed considering two waste management scenarios: C& D landfills and municipal landfills. Ten
thousand Monte Carlo realizations were performed for each scenario. The results for the two scenarios
are discussed below. Tables 3.11 through 3.16 present results for the scenario in which lead abatement
plus painted demolition debris were modeled in municipal landfills.
28

-------
3.2.1 Results for C&D Landfills
Results of Lead based paint analysis for lead abatement debris plus painted demolition debris
managed in C&D landfills are presented in Tables 3.6 through 3.10. Table 3.6 presents a tabulated
frequency distribution of the peak receptor well concentration values which indicated that the safe drinking
water action level for lead in tap water (0.015 nig^L) was at 95.15-th percentile of the cumulative peak
well concentration distribution. This value is close, but slightly higher than the corresponding value for
lead abatement wastes in Table 3.1. This difference is due to increased waste quantity (abatement debris
plus demolition LBP debris) in the landfill.
Table 3.6 Probability Distribution of the peak Receptor Well Concentration of Lead for LBP
Abatement Debris Plus Painted Demolition Debris in C&D Landfills.
Cumulative Probability
Concentration
%
(mg/L)
70
7.84E-14
75
7.69E-12
80
3.15E-10
85
1.10E-08
90
1.12E-05
95
1.25E-02
95.15
1.50E-02
96
4.89E-02
97
1.26E-01
98
2.75E-01
99
5.74E-01
100
2.21E + 00
Table 3.7 presents the probability distribution of arrival times for the peak receptor well
concentrations. The data indicated that the arrival time of the peak concentrations at the receptor well was
less than the 10,000 year cut-off time in approximately 33 percent of the cases. In comparison with Table
3.2, it can be seen that the distribution exhibits a slight shift towards larger time values. A detailed
analysis of the cases in which the federal safe drinking water level (0.015 mg/L) was exceeded at the
receptor well is presented in Tables 3.8 and 3.9. These tables correspond to Tables 3.4 and 3.5 in Section
3.1. Finally, Table 3.10 shows the frequency breakdown of the peak receptor well concentrations above
the groundwater action level for lead. This table corresponds to Table 3.3 in Section 3.1. Appendix B
presents the frequency distribution of key Monte Carlo input parameters for all cases where the peak
receptor well concentration was above the action level for lead.
29

-------
Table 3.7 Probability Distribution of Arrival Time (within 10,000 y) of the Peak Receptor
Concentration of Lead in LBP Abatement Debris Plus Painted Demolition Debris in
C&D landfills.
Cumulative Probability
Travel Time
%
(years)
0.1
57.73
1
1276.00
5
4421.00
10
5621.00
15
6160.00
20
7500.00
25
8762.00
30
9603.00
32.65
9999.00
Overall, the results of incorporating both abatement debris and painted demolition debris in the
analysis were very close to the results of lead abatement debris presented in Section 3.1. Although the
total amount of LBP debris in landfills was more than doubled (44.3 million tons vs 19.1 million tons)
when wastes from abatement and demolition processes were combined, the effect on the peak exposure
concentration was very small. This may be attributed to the fact that lead is strongly sorbed in the soil
and, therefore, would take longer than the 10,000 year cut-off time used in this analysis to reach the
receptor well. As shown in Tables 3.2 and 3.7 the percentage of cases in which the arrival time of the
peak receptor concentration was less than 10,000 years was 29 and 33 percent respectively for LBP
abatement debris and LBP abatement plus demolition debris scenarios. The increased waste quantity in
the latter case may lead to a layered waste in the landfill. However, this will result primarily in an
increased leachate pulse duration, but the modeled leachate concentration itself does not change over time.
The data in Tables 3.1 and 3.6 indicated that the increased waste quantity had a small incremental effect
on the distribution of the peak concentration at the receptor well.
Table 3.8 Frequency Distribution of the Arrival Time of the Peak Well Concentrations of Lead
Exceeding Lead Action Level for LBP Abatement Debris plus Painted Demolition
Debris in C&D Landfills.
Travel Time
Frequency
(% of total)
Cumulative Frequency
(% of total)
0 - 2000
0.06
0.06
2000 - 4000
0.45
0.51
4000 - 6000
0.85
1.36
6000 - 8000
0.78
2.14
8000 - 10000
2.74
4.88
30

-------
Table 3.9 Frequency Distribution of the Peak Well Concentrations Exceeding Lead Action Level
(0.015 mg/L) for LBP Abatement Debris Plus Painted Demolition Debris in C&D
Landfills.
Peak
Concentration (mg/L)
Frequency
(% of total)
Cumulative Frequency
(% of total)
0.015-0.04
0.690
0.690
0.04-0.08
0.680
1.370
0.08-0.10
0.200
1.570
0.10-0.20
0.880
2.450
0.20-0.40
0.900
3.350
0.40-0.60
0.580
3.930
0.60-0.80
0.280
4.220
0.80- 1.0
0.270
4.490
1.0-3.0
0.400
4.880
Table 3.10 Frequency Distribution of the Peak Receptor Well Concentration of Lead in LBP
Abatement Debris Plus Painted Demolition Debris in C&D Landfills.
Peak Concentration (mg/L)
Frequency (%)
0-0.005
94.4
0.005 - 0.10
0.47
0.010-0.015
0.26
0.015-0.020
0.17
0.020- 0.050
0.73
0.050- 0.10
0.67
0.10-0.50
2.07
0.50- 1.0
0.83
1.0-3.0
0.37
3.2.2 Results for Municipal Landfills
The results of the analysis for LBP abatement debris and painted demolition debris managed in
municipal landfills are presented in Tables 3.11 through 3.15. The municipal landfill scenario was
examined as an alternative waste management option. Table 3.11 presents a tabulated frequency
distribution of the peak receptor well concentrations for lead. It can be seen that federal safe drinking
water level for lead (0.015 mg/L) is at the 98.27-th percentile of the distribution. The percentage of cases
that exceed the action level for lead decreased from 4.85 in the case of C&D landfills to 1.73 for municipal
landfills, despite the fact that the source leachate concentration values (TCLP Table 2.7) used for
municipal landfills were higher than those (SPLP Table 2.6) used for C&D landfills. The decrease in the
31

-------
peak receptor well concentration values is due to the larger number of municipal landfills (6034),
compared to C&D landfills (1800), that are available for waste disposal. This means that the quantity of
LBP debris per landfill is lower in the municipal landfill scenario.
Table 3.11 Probability Distribution of the peak Receptor Well Concentration of Lead in LBP
Abatement Debris Plus Painted Demolition Debris in Municipal Landfills.
Cumulative Probability
Concentration
%
(mg/L)
90
6.40E-09
91
1.45E-08
93
9.13E-08
94
6.23E-07
95
2.09E-05
97
2.72E-03
98.27
1.50E-02
99
3.91E-02
100
7.27E + 00
Table 3.12 presents the probability distribution of arrival time for the peak receptor well
concentration of lead. In comparison with Table 3.7 , it can be seen that the distribution exhibits a shift
towards larger time values. The reason for this shift in time values and the associated lower receptor well
concentrations are due to the lower waste quantity per municipal landfill. A detailed analysis of the cases
in which the maximum receptor well concentration of lead exceeded the action level (0.015 mg/1) is
presented in Tables 3.13 and 3.14. These tables correspond to Tables 3.8 and 3.9 in Section 3.2.1.
Finally, Table 3.15 shows the frequency breakdown of the peak receptor well concentration. This table
corresponds to Table 3.10 in Section 3.2.1.
Overall, the results of groundwater analysis for LBP abatement debris plus painted demolition
debris managed in municipal landfills, as discussed above, indicated lower groundwater exposure to lead
compared to the case in which the same waste is managed in C&D landfills.
32

-------
Table 3.12 Probability Distribution of Arrival Time (within 10,000 y) of the Peak Receptor
Concentration for Lead Abatement Debris Plus Painted demolition debris in
Municipal landfills.
Cumulative Probability
Travel Time
%
(y)
0.1
73
1
804
2
1538
5
4024
10
5881
15
6783
20
9457
23.44
10000
Table 3.13 Frequency Distribution of Arrival Time of the Peak Well Concentrations of Lead
Exceeding the Action Level for LBP Abatement Debris plus Painted Demolition
Debris in Municipal Landfills.
Travel Time
(y)
Frequency
(% of total)
Cumulative Frequency
(% of total)
0 - 2000
0.59
0.59
2000 - 4000
0.40
0.99
4000 - 6000
0.26
1.25
6000 - 8000
0.22
1.47
8000 - 10000
0.3
1.77
33

-------
Table 3.14 Frequency Distribution of f the Peak Well Concentration of Lead Exceeding the
Action Level for Lead Abatement Debris Plus Painted Demolition Debris in
Municipal Landfills.
Peak
Concentration (mg/L)
Frequency
(% of total)
Cumulative Frequency
(% of total)
0.015-0.04
0.77
0.77
0.04-0.08
0.44
1.21
0.08-0.10
0.11
1.32
0.10-0.20
0.26
1.58
0.20-0.40
0.1
1.68
0.40-0.60
0.05
1.73
0.60-0.80
0.02
1.75
0.80- 1.0
0.01
1.76
1.0-3.0
0
1.76
>3.0
0.01
1.77
Table 3.15 Frequency Distribution of the Peak Receptor Well Concentration of Lead in LBP
Abatement Debris Plus Painted Demolition Debris in Municipal Landfills.
Peak Concentration (mg/L)
Frequency (%)
0-0.005
97.38
0.005 - 0.10
0.50
0.010-0.015
0.35
0.015-0.020
0.26
0.020- 0.10
1.06
0.10-0.50
0.38
0.50- 1.0
0.06
1.0-3.0
0
>3.0
0.01
34

-------
3.3 Uncertainties Associated with Fate and Transport of Lead
The simulations of lead transport were designed to be reasonably conservative through the use of
inherently conservative assumptions. These conservative assumptions tend to compensate for some of the
processes that may not be accurately accounted for in the Monte-Carlo simulations. Some of the
uncertainties that may be related to subsurface lead transport are discussed below.
For example, the approach for the analysis assumed that all wells located within the down gradient
half of a circle drawn within one mile radius around the landfill could be potentially exposed to landfill
leachate. This may underestimate potential exposure, because landfill leachate plumes in porous soils
(e.g., sand/gravel) where most wells would tend to draw water from generally do not disperse widely and
would be expected to be long and narrow in shape. Moreover, the approach also assumed that all wells
gather water from the uppermost layer of ground water below the ground surface, where leachate releases
from the landfills would most likely be. This may overestimate potential exposure, because many private
wells gather water from deeper layers of ground water which may not be exposed to the landfill leachate.
Fractured rocks are regarded as hydrogeologic media with high uncertainly in groundwater flow
and solute transport properties. The site-based Monte-Carlo modeling approach used in this study utilizes
actual hydrogeologic information from 12 distinct hydrogeologic environments (EPA 1995a). Fractured
media are particularly common in some of the twelve hydrogeologic environments such as igneous and
metamorphic rocks and dissolution of sedimentary rocks. Common fractures in igneous and metamorphic
rocks include fractured granitic rocks, tuffs and fractured basaltic rocks. On the other hand, limestones
are known to have cavities within their structures that significantly effect their hydrogologic properties.
These two regional hydrogeologic environments are present in 130 waste management sites out of the total
790 industrial Subtitle D Landfill waste management facilities in EPA's database. This corresponds to
approximately 25 percent of the facilities. Therefore, it is plausible that lead groundwater exposure risks
associated with landfills located in areas where fractured hydrogeologic environments are dominant may
be underestimated. For example, the presence of dissolution channels in limestone could provide a very
rapid migration pathway for contaminants and thus lead to higher receptor well concentrations. That
scenario is relatively unlikely, but is accounted for in the extreme values in the distributions of hydraulic
and adsorption properties used in the Monte Carlo simulations.
There are some geologic features not explicitly included in the EPACMTP regional hydrogeologic
environments. For example, macro pores in the vadose zone, and epikarstic zones at the top of bed rocks.
Flow and transport in individual macro pores normally occurs in a relatively small spatial scale. The
spatial dimensions of waste management units are often in the vicinity of tens of thousands of square
meters. When all the chemical fluxes through all the macro pores and soil matrix underneath the waste
management units are spatially averaged, the mean fluxes are approximately equal to the chemical fluxes
determined using the infiltration rates over the respective waste management units. For epikarstic zones
where the hydraulic conductivity may be greater than those in the subjacent zones, no provision is available
in EPACMTP; however, fractures or solution channels in several epikarstic zones have been found to be
sediment-filled and may not be more conductive than the lower zones.
Currently, sorption is allowed to occur in the fractured rocks under the assumption that they
behave like equivalent porous media. Lead can be adsorbed to clay particles, calcium carbonate in
limestone, and silicates in igneous rocks. The exposed adsorption sites in fractured media are fewer than
35

-------
those in porous media, therefore it is possible that adsorption may be overestimated in fractured rocks.
However, it must be pointed out here that another retardation mechanism is active in these rocks via matrix
diffusion/uptake (intergranular and intra granular diffusion). Parameters relating to this type of diffusion
have not been well quantified. Matrix diffusion retardation effects are not included in EPACMTP.
Therefore, lead loss due to this phenomenon is conservatively excluded. Any overestimates of adsorption
effect may be more than offset by underestimates of matrix diffusion retardation effects.
3.4 Numerical Stability of the Population in the Tail of the Peak Receptor Well Concentration
Distribution
Numerical stability is the observed numerical changes in the characteristics (i.e., mean, variance,
percentiles) of the Monte Carlo simulation output distribution as the number of simulations increases.
Depending on the structure of the model and the distribution of input parameters, some outputs stabilize
quickly, while other model outputs require more simulations before stabilizing. Ideally, Monte Carlo
simulations should be repeated using several non-overlapping subsequence to check for stability and
repeatability (USEPA, 1995a).
The stability of the Monte Carlo simulations used for the lead-based paint risk analysis was
evaluated for both the municipal and construction and demolition landfill scenarios. To evaluate the
stability of the tail of the output distributions (receptor well concentrations), a Monte Carlo simulation with
30,000 iterations was performed for each of the two scenarios. The stability of the tail was then evaluated
with the following procedure:
1.	1000 sets of N simulations (N = 500 - 20,000) were selected randomly from the set of
30,000 simulations.
2.	90th, 95th, and 99th percentile well concentrations were selected from each of the 1000 sets
of N simulations.
3.	Statistical calculations were performed on the 1000 values of 90th, 95th , and 99th
percentile well concentrations to generate mean and standard deviations for each "N
simulations".
4.	The mean 90th, 95th, and 99th receptor well concentrations were plotted as a function of N
simulations to assess the value of N at which the tail of the distribution became stable, i.e.,
the receptor well concentration no longer varies as a function of N (see Appendix B).
5.	The mean receptor well concentration plots are shown in Appendix B. Plots are shown
in Appendix B with both the 95% confidence interval of the mean and the 95% confidence
interval of the population.
Figures B1 through B12 in Appendix B show that for the 90th percentile well concentrations the
output becomes very stable at about 10,000 simulations (Figures B. 1 and B. 7). As the well concentration
percentile increases to 95, stability occurs at 12,000 simulations (Figures B.2 and B.8) and at the 99th
percentile, stability occurs at about 14,000 simulations (Figures B.3 and B.9). Figures B.4 - B.6 and
Figures B.10 - B.12 demonstrate that the confidence interval of the mean is very narrow at greater than
4000 simulations.
A comparison of the mean 90th, 95th, and 99th receptor well concentrations at high values of N,
or the point of stability, are shown along with the standard deviation in Tables 3.16 (Municipal Landfill
Scenario) and 3.17 (Construction and Demolition Landfill Scenario). These Tables indicate that although
36

-------
the mean receptor well concentration seems to stabilize well before 15,000 simulations, the standard
deviation continues to decrease past 20,000 simulations.
Table 3.16 Variation of Mean Well Concentration (mg/L) and Standard Deviation with Number
of Iterations for Municipal Landfills.
No. of
Simulations
90th Percentile
95lh Percentile
99th Percentile
C
W
a
cw
a
C
W
a
10,000
7.16e-09
1.85e-09
1.73e-05
1.24e-05
3.65e-02
6.54e-03
12,000
7.16e-09
1.73e-09
1.67e-05
1.06e-05
3.66e-02
5.89e-03
14,000
7.14e-09
1.55e-09
1.64e-05
9.39e-06
3.66e-02
5.7e-03
16,000
7.08e-09
1.44e-09
1.61e-05
8.56e-06
3.64e-02
5.21e-03
18,000
7.10e-09
1.37e-09
1.60e-05
7.57e-06
3.65e-02
4.89e-03
20,000
7.07e-09
1.25e-09
1.60e-05
7.28e-06
3.65e-02
4.79e-03
37

-------
Table 3.17 Variation of Mean Well Concentration in (mg/L) and Standard Deviation of Well
Concentrations for Construction and Demolition Landfills.
No. of
Simulations
90th Percentile
95h Percentile
99th Percentile
cw
a
C
w
a
C
W
a
10,000
6.51e-07
3.41e-07
2.42e-03
9.22e-04
4.41e-01
4.84e-02
12,000
6.41e-07
3.16e-07
2.39e-03
8.36e-04
4.40e-01
4.56e-02
14,000
6.26e-07
2.77e-07
2.37e-03
7.59e-04
4.41e-01
4.25e-02
16,000
6.24e-07
2.64e-07
2.36e-03
7.21e-04
4.41e-01
4.04e-02
18,000
6.14e-07
2.48e-07
2.34e-03
6.65e-04
4.41e-01
3.79e-02
20,000
6.12e-07
2.29e-07
2.35e-03
6.18e-04
4.42e-01
3.51e-02
38

-------
4.0 SUMMARY
EPA modeled two disposal scenarios: LBP abatement debris in C&D landfills and LBP abatement
debris plus painted demolition debris in C&D and municipal landfills. In the case of C&D landfills, EPA
modeled a conservative disposal scenario where it was assumed that debris would be managed in 900
landfills (i.e., one-half of the existing 1,800 C&D landfills). Except for the total number of landfills
(1,800), EPA did not have any site-specific data for commercial C&D landfills. EPA, therefore, assumed
that the overall location distribution of C&D landfills and Subtitle D Municipal landfills in the United
States are similar to the general distribution of the industrial Subtitle D landfills, and therefore, used 1986
Industrial D Landfill survey information to develop the hydrogeologic information, climatological data,
and soil characteristics for use as input to the groundwater modeling analyses. A similar approach was
used in the case of municipal landfills. Using the EPA's Composite Model for Leachate Migration with
Transformation Products (EPACMTP) in conjunction with the MINTEQA2 metal speciation model, EPA
modeled the lead leachate migration from the bottom of unlined C&D landfills and from the bottom of
unlined Municipal Solid Waste Landfills (MSWLF) in the subsurface environment. The models and the
modeling approach used here were also used in the HWIR proposal.
The groundwater modeling analysis used a Monte Carlo approach to determine the probability
distribution of peak receptor well concentrations over a 10,000 year exposure period. The MINTEQA2
model was used to determine subsurface lead sorption isotherms under a range of environmental
conditions, i.e., variation in pH and other factors controlling the subsurface mobility of lead. These data
were used together with LBP debris volumes, hydrogeological, climatological and soil characteristics to
generate 10,000 Monte Carlo realizations of the exposure concentration of lead in groundwater. The latter
was defined as the peak concentration at a receptor placed anywhere down gradient from the landfill,
within a one mile radial distance from the down gradient edge of the waste unit. In all of the scenarios,
the source is conservatively assumed to leach at a constant concentration with time until all the waste in
the landfill is depleted.
The modeling approach used for two disposal scenarios (scenario 1: LBP abatement debris
disposal in C&D landfills and scenario 2: LBP abatement debris plus painted demolition debris disposal
in both C&D and municipal landfills). The results for C&D landfills suggest the following:
1)	The peak receptor well concentration would be between zero and 0.005 mg/1 (one-third
of the 0.015 mg/L safe drinking water action level for lead in tap water) in approximately
95 percent of receptor wells, located anywhere downstream of a C&D landfill, when LBP
abatement debris was the only lead source. [The peak receptor well concentration would
be below 0.005 mg/1 in little more than 94 percent of the cases if LBP debris from
abatement, demolition (including R&R activities) was collectively managed in C&D
landfills.]
2)	The modeling results show that only in less than 4.4 percent of the cases would the
receptor well lead concentration exceed the regulatory action level (15 parts per billion)
over a time horizon of 10,000 years and that most of these exceedences would occur 5,000
years after disposal of LBP debris from abatement activities. The receptor well
concentration would exceed the regulatory action level over atime horizon of 10,000 years
in only about 4.8 percent of cases if painted demolition debris (including R&R activity)
were disposed along with LBP abatement debris in C&D landfills.
39

-------
3) The modeling results also show that the federal safe drinking water action level for lead
in the tap water (0.015 mg/L) was not exceeded at the receptor well during the first 500
years and between 500 and 1,000 years it may potentially exceed at only one site in
10,000 Monte Carlo simulated sites (i.e., frequency of 0.01%).
The results of the modeling analyses for municipal landfills suggests that the LBP debris can safely
be disposed. The results indicate that it would take a few hundred years for lead from LBP debris at a few
of the landfill sites to reach drinking water wells in excess of the acceptable drinking water level for lead.
Specifically:
1)	Over a time horizon of 10,000 years, the peak receptor well concentration would be
between zero and 0.005 mg/L (one-third of the drinking water action level) in
approximately 97.5 percent of the cases.
2)	The concentration of lead in a receptor well would exceed the regulatory action level
(0.015 mg/L) in 1.77 percent of cases over a 10,000 years time horizon.
3)	The drinking water action level for lead would be exceeded in 0.11% of cases during the
first 500 years and 0.20% cases during 500 to 1,000 years.
Thus, this modeling analysis suggests that the potential impact to groundwater resources from the disposal
of LBP debris in MSWLFs will be negligible. The calculated risks are less than those calculated for the
disposal of LBP debris in C&D landfills because the number of MSWLFs is much greater than the total
number of C&D LFs, and MSWLFs tend to be much larger than C&D LFs. Therefore, the lead released
from these MSWLFs tend to be less, although TCLP concentration were used as input for the model. (As
discussed above, the TCLP lead concentrations are higher than the corresponding SPLP concentrations.)
Thus, the potential impact to groundwater resources from the disposal of lead-based paint debris
in these landfills, even under the conservative assumptions, is observed in less than 95%of the Monte Carlo
simulated sites. This is well below the 90 percentile protection level used by the Agency in the HWIR
proposal (see 60 FR 66343, December 21, 1995). In landfills where groundwater contamination may
become a cause of concern, the contamination would only occur over an extremely long period of time.
This contrasts dramatically with the known impact of in-place lead contaminated architectural components.
Additionally, any control measures such as groundwater monitoring, or leachate collection system would
be of slight or no value because the groundwater would be monitored only during the active life to 30-years
after closure of a landfill. Also, the use of a liner may not serve as an effective deterrent against the
release of leachate, given the very long time frame associated with exposures of lead in nearby drinking
water wells.
The results of the analysis performed to investigate the numerical stability of the population in tail
of the peak receptor well concentration distribution indicated that the mean 90-th, 95-th and 99-th
percentile values of the tail population became stable after performing 10,000 to 14,000 Monte Carlo
iterations.
40

-------
5.0 REFERENCES
API, 1989. Hydrogeologic Database for Groundwater Modeling. API Publication No. 4476, American
Petroleum Institute.
Deutsch, J. W., 1997. Groundwater Geochemistry. Fundamentals and Applications to Contamination.
CRC Press LLC, 2000 Corporate Blvd, N.W., Boca Raton, Florida 33431.
Heatti, R.C., 1984. State Summaries of Groundwater Resources. United States Geological Survey Water-
Supply Paper 2275.
ICF, Inc. 1995. Construction and Demolition Waste Landfills. Prepared for USEPA, Office of Solid
Waste, Washington, DC, 20460.
SAIC, 1994. Background Document on Lead Abatement Waste Study (Interim Draft). Prepared for
USEPA, Office of Solid Waste.
Schroder, P.R. et al. 1984. The Hydrologic Evaluation of Landfill Performance Model (HELP):
volume I: users guide for version I, vol. II- documentation for version I. EPA/530-SW-84-009,
U.S. EPA, Washington DC 20460.
USEPA, 1996. Analysis of EPA's Industrial Subtitle D Databases used in Groundwater Pathway Analysis
of the Hazardous Waste Identification Rule (HWIR). Office of Solid Waste, Washington, D.C.,
20460.
USEPA, 1995-a. EPA's Composite Model for Leachate Migration with Transformation Products
(EPACMTP). Users Guide, Office of Solid Waste, Washington, D.C., 20460.
USEPA, 1995-b. EPA's Composite Model for Leachate Migration with Transformation Products
(EPACMTP). Background Document, Office of Solid Waste, Washington, D.C., 2
USEPA, 1995-c. EPA's Composite Model for Leachate Migration with Transformation Products
(EPACMTP). Background Document for Finite Source Methodology. U.S. EPA, Office of Solid
Waste, Washington, D.C., 20460.
USEPA, 1995-d. EPA's Composite Model for Leachate Migration with Transformation Products
(EPACMTP). Background document for Metals: Methodology. U.S. EPA, Office of Solid
Waste, Washington, D.C., 20460.
USEPA, 1995-e. EPA's Composite Model for Leachate Migration with Transformation Products
(EPACMTP). Background document for Metals: MINTEQA2 Derived Adsorption Isotherms.
U.S. EPA, Office of Solid Waste, Washington, D.C., 20460.
USEPA, 1992. Behavior of Metals in Soils. Groundwater Issue Paper, EPA/540/s-92/018. U.S.
Environmental Protection Agency, Washington, D.C., 20460
USEPA, 1991. Facilitated Transport of Inorganic Contaminants in Groundwater: Colloidal Transport,
EPA/600/M-91/040. U.S. Environmental Protection Agency, Washington, D.C., 20460.
41

-------
USEPA, 1990. Basic Concepts of Contaminant Sorption at Hazardous Waste Sites. Groundwater Issue
Paper, EPA/540/4-90/053. U.S. Environmental Protection Agency, Washington, D.C., 20460.
USEPA, 1989. Contaminant Transport in Fractured Media: Models for Decision Makers. Groundwater
Issue Paper, EPA/540/4-89/004. U.S. Environmental Protection Agency, Washington, D.C.,
20460.
USEPA, 1988. Draft National Survey of Solid Waste (Municipal) Landfill Facilities EPA/530-SW-88-034,
U.S. Environmental Protection Agency, Washington, D.C., 20460
42

-------