American Cyanam
EPA REGION 2
CONGRESSIONAL DIST. 07
NEW JERSEY	Somerset County
EPA ID# NJD002173276	1	Bridgewate, Township
Site Description 	
The site is located in the southeastern section of Bridgewater Township, Somerset County, New Jersey.
The site is approximately 575 acres in size. The site is located adjacent to the Rartian River and lies
above the Brunswick Aquifer, New Jersey's second largest source for drinking water. On the site are 27
impoundments, both active and inactive, which have been used for disposal of various chemical sludges
and other wastes. Investigations conducted by the New Jersey Department of Environmental Protection
(NJDEP) have documented groundwater and soil contamination. The site is fenced and restricted.
Approximately 14,000 people live within a 3- mile radius of the site. The closest home is 2,000 feet
away, and 30 private wells lie close to the site. American Home Products Corporation purchased
American Cyanamid Company in 1994 and assumed full responsibility for environmental remediation at
the site. NJDEP is the lead agency for the site.
0.. D	...... „ • , . , .	,	NPL LISTING HISTORY
Site Responsibility: mSS,K,sbemg addressed	Proposed Date: 12/01/82
Federal, State and pnvate party actions.	^ ^
Threats and Contaminants 	
Groundwater underlying the area is highly contaminated with various volatile organic
compounds (VOCs) such as benzene, chlorobenzene, ethylbenzene, xylene, and metals from
site production activities. Sludges and soils sampled in on-site impoundments contain heavy
metals, cyanide, and VOCs.
Of the 27 site impoundments, 16 are sources of groundwater contamination. These 16
impoundments have been subdivided into three groups, as described below. The
impoundments were used for on-site waste disposal during the plant's operations, and some
American Cyanamid
1
May 2002

-------
of the impoundments are being converted to permanent on-site disposal units as part of the
site cleanup. Impoundment waste include, VOCs, Semi-VOCs, and heavy metals.
7TV
Site soils were found to contain polychlorinated biphenyls, polyaromatic hydrocarbons, and
chromium. On site workers or trespassers may be exposed to contaminants through direct
contact with contaminated soils, sludges or ground water. Ground water is not a source of
drinking water at this site.
The Hill Property is a 140 acre sub-section of the site. A March 1992 Quantitative Risk
Assessment Report, established that there were no current or future unacceptable risks to
human health and the environment associated with the Hill Property. Based on this finding,
no remedial actions were required for the Hill Property, and on December 29, 1998, the Hill
Property portion of the site was deleted from the NPL. The Hill Property has been
redeveloped for commercial use, including a minor league baseball stadium.
Cleanup Approach
Site contamination is being addressed in three separate phases: impoundments; site-wide soils; and
groundwater and the Hill Property. 16 Impoundments contribute to groundwater contamination. These
16 impoundments are subdivided into groups according to waste-type and location: Group 1(11, 13, 19
and 24); Group II (15, 16, 17, and 18); and Group III (1, 2, 3, 4, 5, 14, 20, and 26). NJDEP issued a
Record of Decision (ROD) for Group I impoundments in September 1993, a ROD for Group II
impoundments in July 1996, and a ROD for Group III impoundments in October 1998. The remedies for
the impoundments vary, including on-site and off-site treatment, waste consolidation for on-site
placement, off-site recycling and off-site disposal. NJDEP's strategy addresses the most serious
impoundments first.
The site cleanup also involves closure and post-closure of four on-site impoundments (Impoundments 6,
7, 8, and 9A) and the construction of a waste consolidation facility (the Impoundment 8 facility). The
design includes a triple liner, leachate detection and collection system and ground water monitoring
system.
Cleanup Progress I Vi (Actual Construction Underway)_
Ground Water: American Cyanamid implemented a pump and treat system in 1982.
Approximately 650,000 gallons per day are pumped out of bedrock wells. The pumping
contains contamination below the main plant and west yard areas of the site. Quarterly
monitoring reports are submitted to NJDEP, which contain information on groundwater quality and site
hydrology. Groundwater monitoring results will be used when developing a final site-wide groundwater
remediation plan. This plan will be developed after completion of soil remediation.
Impoundments:
American Cyanamid
May 2002

-------
Group I Impoundments (11,13,19, and 24)
Remediation of the Group I Impoundments, consisting of solidification and consolidation into the
Impoundment 8 facility was initiated in accordance with the September 1993 Record of Decision (ROD).
The Remediation of Impoundments 19 and 11 was completed. The remediation of Impoundments 13 and
24 will be initiated after completion of the remediation of the Group II and III Impoundments, which are
more contaminated. Completion of the remedy for all the Group I impoundments is planned for 2008.
Group II Impoundments (15,16,17, and 18)
The Remediation of Group II Impoundments was initiated in accordance with the July 1996 ROD. In the
1996 ROD, the original remedy for Impoundments 15 and 16 called for the consolidation of the material
from Impoundment 16 into Impoundment 15, followed by covering with a synthetically lined cap. In
1998, NJDEP received a proposal from American Home Products Corporation for an alternative remedy
consisting of recycling/reuse of iron oxide material at an off-site facility. Based on this proposal, NJDEP
issued a Superfund Explanation of Significant Differences, which changed the selected remedy in the
July 1996 ROD to recycling /reuse. This recycling/reuse activity will be initiated in the summer of 2000.
The remediation of Impoundment 17, Solidification and consolidation into the Impoundment 8, will be
initiated after completion of the remediation of the Group III Impoundments.
NJDEP completed security fencing, berm improvements, and maintenance of natural vegetative cover for
the Impoundment 18. Completion of the remedy for all the Group II impoundments is planned for 2008.
Group III Impoundments (1, 2, 3, 4, 5,14,20 & 26)
NJDEP and EPA signed the ROD for the Group III Impoundments on October 8, 1998. The selected
remedy includes Low-Temperature Thermal Treatment, Bio-treatment and Consolidation and placement
of treated material in Impoundment 8. Remedial design is in progress for the Group III Impoundments.
Impoundment 26 remediation starts in the Summer 2000. In addition, pilot testing begins for thermal and
bio-treatment for Group III impoundments in Summer 2000. Completion of the remedy for all the Group
III impoundments is planned for 2007. Group III impoundments are currently in the remedial design
phase and will enter into the remedial action phase in 2003.
	 The remedial investigation for the site-wide soil is complete. The soil remediation is on hold
until all impoundment remediation is completed, currently targeted for 2008, at which time soil remedial
alternatives will be developed.
In 2001 and at the request if the Natural Resources Trustees, NJDEP designated a new operable
unit for wetlands, flood plains and other water bodies. As of March 28, 2002, this operable unit
is in the remedial investigation and feasibility study phase.
American Cyanamid	3	May 2002
Soils

-------