Economic Analysis for the Clean Water Act
Section 401 Certification Rule

U.S. Environmental Protection Agency

May 28, 2020


-------
Table of Contents

List of Tables	3

List of Figures	4

Abbreviations	5

1	Introduction	6

2	Overview of Baseline	8

2.1	Overview of Federal Licenses and Permits	9

2.1.1	Section 404 Permits	10

2.1.2	Section 402 NPDES Permits	11

2.1.3	Interstate Natural Gas Pipeline and Hydropower Project Licenses	11

2.1.4	Rivers and Harbors Act Sections 9 and 10 Permits	12

2.1.5	Nuclear Power Plant Licenses	12

2.1.6	Mining Licenses	12

2.2	Overview of Certifying Authority Actions	12

3	Section 401 Certification Example Cases Under Baseline	16

3.1	Examples Where a Certifying Authority Denied Certification	16

3.1.1	New York Natural Gas Pipelines	16

3.1.2	Millennium Bulk Terminals in Washington State	19

3.2	Examples Where a Certifying Authority Failed to Act	20

4	Potential Effects of the Final Section 401 Certification Regulations	21

4.1	Timeframe	24

4.1.1	Final Rule Provisions	24

4.1.2	Potential Effects - Timeframe	25

4.2	Scope	27

4.2.1	Final Rule Provision	27

4.2.2	Potential Effects of the Final Rule - Scope	28

4.3	Pre-Filing Meeting Request Requirement	29

4.3.1	Final Rule Provisions	29

4.3.2	Potential Effects of the Final Rule - Pre-Filing Meeting Request Requirement	29

4.4	Potential Effects on Federal Agencies, States, and Tribes	30

5	Possible Effects on Example Cases	32

5.1	New York Natural Gas Pipelines	32

5.2	Millennium Bulk Terminals in Washington State	33

5.3	West Virginia Hydropower Projects	34

6	Data Limitations and Uncertainty	34

1


-------
7 References	35

Appendix A. Tables/Figures for Federal License/Permit Overview	38

2


-------
List of Tables

Table 2-1: License and permit summary data by certifying authority	9

Table 3-1: Section 401 certification denial cases	17

Table 4-1: Summary of potential effects of final section 401 revisions	23

Table 5-1: Possible impacts of the final section 401 revisions on recent New York State pipeline denials

	32

Table 6-1: Limitations and uncertainties in estimating effects of final rule	34

Table A-l: State websites with public documentation of licenses/permits and section 401 certification
documents	38

3


-------
List of Figures

Figure A-l. NPDES program authorizations as of July 2015


-------
Abbreviations

ACWA

Association of Clean Water Administrators

ASWM

Association of State Wetland Managers

BLM

Bureau of Land Management

Corps

U.S. Army Corps of Engineers

CWA

Clean Water Act

EA

Economic Analysis

EIS

Environmental Impact Statement

EPA

U.S. Environmental Protection Agency

FERC

Federal Energy Regulatory Commission

FWPCA

Federal Water Pollution Control Act of 1948

FFP

Free Flow Power Corporation

ICR

Information Collection Request

JARPA

Joint Aquatic Resources Permit Application

NEPA

National Environmental Policy Act

NGA

Natural Gas Act

NOI

Notice of Intent

NPDES

National Pollutant Discharge Elimination System

NRC

Nuclear Regulatory Commission

NWP

Nationwide Permit

NYSDEC

New York State Department of Environmental Conservation

POTW

Publicly Owned Treatment Works

RGL

Regulatory Guidance Letter

RGP

Regional General Permit

SPGP

State Programmatic General Permit

TAS

Treatment As a State

USACE

U.S. Army Corps of Engineers

USD A

U.S. Department of Agriculture

WQS

Water Quality Standards

WVDEP

West Virginia Department of Environmental Protection


-------
1 Introduction

Under the Clean Water Act (CWA) section 401, a federal agency may not issue a license or permit to
conduct an activity that may result in any discharge into waters of the United States unless the certifying
authority where the discharge would originate certifies that the discharge will comply with applicable
water quality requirements or waives certification. The certifying authority is determined based on the
location where the discharge originates and can be a State, territory, authorized Tribe, and in some
circumstances, the U.S. Environmental Protection Agency (EPA). All States and U.S. territories currently
have section 401 certification authority. Certification authority under CWA section 401 can be assumed
by Indian tribes under section 518 of the CWA, which authorizes the EPA to treat eligible Tribes with
reservations in a similar manner to States (referred to as "treatment as States" or TAS).1 The EPA is
responsible for section 401 certification decisions in instances when a State lacks certification authority,
on Tribal lands where Tribes do not have TAS, and on lands with exclusive federal jurisdiction.

As the Agency charged with administering the CWA,2 as well as a certifying authority in certain
instances, the EPA is responsible for developing a common regulatory framework for certifying
authorities to follow when completing section 401 certifications.3 In 1971, the EPA promulgated
regulations for implementing the certification provisions in section 21(b) of the Federal Water Pollution
Control Act of 1948 (FWPCA), but the EPA never updated those regulations to reflect the 1972
amendments to the FWPCA (commonly known as the CWA), which created section 401, despite the fact
that there were changes to the relevant statutory text.

In April 2019, the President issued Executive Order 13868, entitled Promoting Energy Infrastructure and
Energy Growth (the Executive Order), to encourage greater investment in energy infrastructure in the
United States by promoting efficient federal permitting processes and reducing regulatory uncertainty.
The Executive Order identified the EPA's outdated section 401 federal guidance and regulations as one
source of confusion and regulatory uncertainty hindering the development of energy infrastructure. Prior
to this rulemaking, the EPA's only written guidance to the public on section 401 implementation was an
interim handbook produced in 2010 entitled Clean Water Act Section 401 Water Quality Certification: A
Water Quality Protection Tool for States and Tribes. This 2010 handbook had not been updated since it
was released and therefore did not reflect the current case law interpreting CWA section 401 (see section
II.F.4 of the final rule preamble for a detailed discussion of the relevant court decisions on section 401).
The Executive Order directed the EPA to review CWA section 401 and the EPA's 1971 certification
regulations and interim guidance; issue new guidance to States, Tribes, and federal agencies within 60
days of the Order; and propose new section 401 regulations within 120 days of the Order.

On June 7, 2019, the EPA released updated guidance for States, Tribes, and federal agencies to provide
information and recommendations for implementing the substantive and procedural requirements of
section 401 (U.S. EPA, 2019a), and rescinded the interim handbook. On August 8, 2019, the EPA signed
the proposed rule "Updating Regulations on Water Quality Certifications," which was published on
August 22, 2019 (84 FR 44080), to replace and modernize the 1971 water quality certification regulations
located at 40 CFRpart 121 and to provide greater clarity and regulatory certainty for the water quality
certification process, consistent with the Executive Order. The 60-day public comment period closed on

1	33 U.S.C. 1377(e).

2	The EPA co-administers section 404 with the Army Corps of Engineers (the Corps).

3	33 U.S.C. 1251(d), 1361(a).

6


-------
October 21, 2019. After considering public comments on the proposed rule and the proposed economic
analysis, the EPA is finalizing the Clean Water Act Section 401 Certification Rule. The Agency's
response to comments document is available in the docket for the final rule at Docket ID No. EPA-HQ-
OW-2019-0405.

Pursuant to Executive Orders 12866 and 13563, the Agency conducted this economic analysis (EA) to
better understand the potential effects of this final rule on certifying authorities and project proponents.
While this EA is informative in the rulemaking context, the EPA is not relying on the analysis as a basis
for this final rule. See, e.g., National Association of Home Builders, et al., v. EPA, 682 F.3d 1032 1039-40
D.C. Circuit 2012. This information was not used to establish the new regulatory text for the final rule.

Section 2 of this EA presents an overview of current practice (baseline scenario), including an overview
of federal licensing and permitting actions that may trigger the need for a section 401 certification.

Section 3 of this EA presents four examples of certification denials and one example of a circumstance
where a certifying authority failed to act. These example cases demonstrate that there is existing
confusion about the timeline and scope of section 401 under the 1971 certification regulations, which has
led to project delays and increased project costs. Section 4 of this EA includes a qualitative assessment of
the potential impacts of the final rule on project proponents and certifying authorities compared with the
baseline scenario. Section 5 of this EA includes an assessment of how the final rule provisions could have
increased regulatory certainty and reduced project delays in the five example cases from section 3.

The Agency prepared a proposed EA along with the proposed rule and has made enhancements to this
final EA in response to feedback received from public commenters and federal agencies (see the
Agency's response to comments document in the docket for the final rule, Docket ID No. EPA-HQ-OW-
2019-0405), as well as updates to example cases to represent the most current information. For instance,
the Agency provided clarifications to the descriptions of federal agency licensing and permitting
programs in section 2 of this EA. Additionally, the Agency provided clarifications to the example cases in
section 3.1 of this EA and added an example case from the hydropower sector in section 3.2 of this EA.
The Agency updated section 4 of this EA to reflect the polices in the final rule, including new discussions
on the pre-filing meeting request requirement (see section 4.3).

The Agency anticipates the final rule will result in more predictable, efficient decision-making by
certifying authorities which will result in a net cost decrease and reduction in burden overall. The final
rule has the potential to reduce costs and minimize delays for project proponents. The final rule's
timeframe provisions will increase clarity regarding when the reasonable period of time begins and ends,
leading to predictable certifying authority decision-making timelines and preventing unintentional
waivers from occurring. The Agency also anticipates that the more clear and unambiguous scope of
certification under this final rule will reduce the burden placed on certifying authorities who were
previously considering information and factors beyond the scope of section 401. Under the final rule, the
scope of certification applies to all actions taken on a certification request, including adding conditions to
a certification and denying certification. Additionally, the final rule requires specific information to be
included in a certification with conditions or a denial, but the Agency expects certifying authorities are
already generating similar information to develop a complete and legally defensible administrative record
to support certification actions.

Section 401 envisions a robust State and Tribal role in the federal licensing or permitting process,
including those in which local authority may otherwise be preempted by federal law. Section 401 also
places important limitations on how that role may be implemented to maintain an efficient federal
licensing and permitting process. Because EPA failed to update its certification regulations when the 1972
CWA amendments were enacted, some State and Tribal processes and considerations that emerged over

7


-------
time may have exceeded the bounds intended by Congress. In the final rule, the EPA is establishing the
scope of section 401 as protecting the quality of waters of the United States from point source discharges
associated with federally licensed or permitted activities by requiring compliance with water quality
requirements, as defined in the final rule. This final rule may prevent some States and Tribes from
imposing more onerous requirements than those intended by Congress and is therefore considered
deregulatory at a national level, pursuant to Executive Order 13771 (82 FR 9339, February 3, 2017).

2 Overview of Baseline

For the purposes of the EA, the baseline scenario means practices that exist under the 1971 certification
regulations. This section presents an overview of the baseline scenario, including an overview of federal
licensing and permitting actions that may trigger the need for a section 401 certification. As noted
throughout the proposal preamble and the EA, the EPA acknowledges that many certifications under the
baseline scenario reflect an appropriately limited interpretation of the purpose and scope of section 401
and are issued without controversy. Although a few high profile certification denials are part of the
factual and administrative record for this rulemaking, and EPA has considered these facts during the
rulemaking process, the EPA has not relied on these facts as the sole or primary basis for this rulemaking.
The Agency's longstanding failure to update its regulations created the confusion and regulatory
uncertainty that were ultimately the cause of those controversial section 401 certification actions and the
resulting litigation.

Recent court cases illustrate the type of uncertainty this rule is attempting to resolve, highlighting that
some project proponents, certifying authorities, and federal agencies have different ideas about when the
time for review of a certification begins and—once begun—whether the review period can be tolled or
extended beyond one year. See Hoopa Valley Tribe v. FERC, 913 F.3d 1099 (D.C. Cir. 2019); New York
State Dep't ofEnvtl. Conservation v. FERC, 884 F.3d 450 (2d Cir. 2018); Constitution Pipeline Co., LLC
v. New York State Dep't ofEnvtl. Conservation, 868 F.3d 87 (2d Cir. 2017). Questions have also arisen
regarding the role of the federal agency in determining whether a waiver has occurred, and whether a
certifying authority may deny certification for reasons that are unrelated to water quality. Millennium
Pipeline Co. v. Seggos, 860 F. 3d 696 (D.C. Cir. 2017); Lighthouse Resources, Inc. v. Inslee, No. 3:18-cv-
5005 (W.D. Wash, filed Jan. 8, 2018). The example cases in section 3 present in greater detail the
potential for regulatory uncertainty to occur under the baseline scenario.

In accordance with the Paperwork Reduction Act, the EPA has an OMB-approved Information Collection
Request (ICR) for the 1971 certification regulations (EPA ICR Number 2603.03, OMB Control Number
2040-0295). That ICR estimates that respondents will submit approximately 100,000 certification
requests per year and that annual paperwork burden is expected to be approximately 1 million hours.

ICRs are developed based on available information about how a regulation may affect a respondent;
however, the data used to support this ICR is not robust enough to rely on for the development of a
quantitative economic analysis. To estimate the burden for this ICR, the EPA selected the midpoint of an
estimated low and high burden. The low-end burden was taken from EPA ICR Number 0229.23, which
was established for section 401 certifications for federally issued NPDES permits and does not capture
the range of certification requests prepared by project proponents and reviewed by certifying authorities
for other license and permit types. The high-end burden was established based on information provided
by six respondents to an EPA questionnaire, which is not expected to be representative of the whole
population of certifying authorities and is not representative of the population of project proponents. The
limitations and uncertainties in this data set preclude its use for the development of a quantitative
economic analysis. The ICR Number 2603.03 burden estimates are provided in this EA for informational

8


-------
purposes only and are not intended for use as quantitative conclusions about potential economic costs or
benefits of the baseline scenario or the final rule.

This section of the EA has been updated from the proposed EA to reflect current information and to
incorporate clarifications provided during engagements with other federal agencies. The Agency has also
combined sections 2 and 3 from the proposed EA to present a single, clear baseline scenario. The Agency
also replaced two maps included as Figure 2 and Figure 3 in the proposal with citations to websites
included in the references section of this EA that provide comparable information.

2.1 Overview of Federal Licenses and Permits

Section 401 certification is required for various federal licenses and permits including, but not limited to,
dredge and fill activities that require CWA section 404 permits from the U.S. Army Corps of Engineers
(Corps), CWA section 402 National Pollutant Discharge Elimination System (NPDES) permits for
industrial and municipal point source discharges issued by the EPA, permits issued under sections 9 and
10 of the Rivers and Harbors Act (RHA) by the Corps (or the U.S. Coast Guard for bridges and
causeways under section 9), mining plan of operations approvals issued by the Department of the
Interior's Bureau of Land Management (BLM) and the U.S. Department of Agriculture (USDA) Forest
Service, and projects requiring licenses from the Federal Energy Regulatory Commission (FERC) or the
Nuclear Regulatory Commission (NRC). Typically, certifying authorities conduct section 401
certification review during the federal agency's license or permit process. Some certifying authorities
have established joint application procedures with federal agencies to promote simultaneous review (e.g.,
Alabama,4 New York,5 Oregon,6 South Carolina7).

The most common federal licenses and permits subject to section 401 certification are CWA section 404
permits issued by the Corps. Additional federal licenses and permits may be subject to section 401 under
the final rule if they authorize an activity that may result in a discharge from a point source into a water of
the United States. For a list of State websites with public documentation of licenses and permits and
section 401 certification documents, see Table A-l in Appendix A.

Table 2-1 presents summary information on the number of federal licenses and permits issued each year.
The table provides separate values for general and individual licenses and permits, when applicable.
General licenses and permits provide streamlined procedures for project proponents by authorizing
categories of discharges or simplified review procedures when the proposed discharges comply with
specified requirements, whereas individual licenses and permits are customized to a specific project and
discharge. These values are intended to show the distribution of federal licenses and permits commonly
requiring certification.

Table 2-1: License and permit summary data by certifying authority

License/Permit
Type

Annual Average #

Licenses/Permits

Issued8

Timeframe for Section
401 Review

CWA Section 404

50,159 general;
2,511 individual"

60 days - 1 year

4	http://www.adem.state.al.us/DeptForms/Forml66.pdf.

5	https://www.nan.usace.army.mil/portals/37/docs/regulatory/geninfo/genp/jointappinstruc.pdf.

6	https://www.nwp.usace.army.mil/Missions/Regulatory/Apply.

7	https://scdhec.gov/environment/water-quality/water-quality-certification-401-process-explained.

9


-------
Table 2-1: License and permit summary data by certifying authority

License/Permit
Type

Annual Average #

Licenses/Permits

Issued3

Timeframe for Section
401 Review

Rivers and Harbors Act
Section 10

8,607 general;
1,670 individual0

60 days - 1 yearh

CWA Section 402

16 general;
150 individual

60 days'

Rivers and Harbors Act
Section 9

30-356

1 year6

Federal Energy
Regulatory
Commission license

47f

1 yearJ

Nuclear Regulatory
Commission license

3-4g

1 year

a.	Includes all permits issued by the relevant federal agency (section 401 certification either granted, granted with conditions, or waived)

b.	Estimate based on the annual average number of 404 permits from 2013-2018 based on counts provided by the Corps.

c.	Estimate based on the annual average number of section 10 permits from 2013-2018 based on counts provided by the Corps.

d.	Estimate based on the annual average of EPA-issued 402 permits from 2012-2017.

e.	Estimate based on personal communication with Shelly Sugarman, Bridge Permits and Policy Division, Coast Guard Bridge Program.

f.	Estimate based on annual average license issuance for hydropower facilities/major natural gas pipelines from 2013-2018 (FERC, 2019a, 2019b)

g.	Estimate based on annual average number of licenses for operating nuclear power reactors from 2013 to 2018 (NRC, 2018). From 2013 to
2018, only one new operating license was issued, and 20 renewals were issued, or approximately 3.5 per year over the six-year period

h.	Timeframe depends on Corps district. Corps regulations (33 CFR 325.2) specify that waiver could occur if the certifying authority does not
issue a decision within 60 days. Historically, many Corps districts have allowed a longer timeframe.

i.	40 CFR 124.53(c)(3), unless unusual circumstances warrant a longer timeframe,
j. 18 CFR 4.34(b)(5)(iii)

2.1.1 Section 404 Permits

The Corps issues two types of CWA section 404 permits, general and individual. General permits are for
activities that are similar in nature, cause only minimal adverse environmental impacts, and have only
minimal cumulative environmental impacts (USACE, 2017). There are three types of general permits:
Nationwide Permits (NWPs), Regional General Permits (RGPs), and State Programmatic General Permits
(SPGPs). The most common general permits are NWPs, which provide streamlined review and
authorization for activity categories that are determined by the Corps to have minimal adverse impacts on
the aquatic environment. NWPs automatically expire, unless renewed, every five years. The Corps has 52
NWPs as of March 2017, which are effective through March 18, 2022 (USACE, 2017). RGPs are issued
on a regional basis by an individual Corps district (USACE, n.d.-a). There is no standard set of RGP
activity categories that apply to all States, and there are varying numbers of RGPs issued by different
Corps Districts. SPGPs authorize categories of activities that are also authorized by States with regulatory
programs similar to the section 404 program, and the Corps' section 404 authorization may be provided
with the state authorization with no activity-specific review by the Corps (USACE, n.d.-a).

Many States grant section 401 certification for activities covered under certain NWPs and RGPs. When a
certifying authority grants certification for a NWP or RGP, all actions or activities that meet the
requirements of the NWP or RGP are covered under the section 401 certification without additional
review or action by the certifying authority. Certifying authorities can grant certifications for general
permits with or without conditions. Some States grant certification of NWPs with conditions to address
state specific water quality concerns. NWPs that are denied certification, and some that are granted with
conditions that do not comply with the Corps' criteria for permit conditions at 33 CFR 325.4, require
individual section 401 review, and the Corps handles these circumstances by asking the project proponent
to submit a project specific request for section 401 certification to the State or Tribe in order to be
authorized under the NWP. States vary on whether and which NWPs are denied certification. For

10


-------
example, Colorado does not deny certification or require any additional review for NWPs (Colorado
Environmental Records, n.d.), whereas other States like California may deny certification and require
additional review for certain NWPs (California Water Boards, 2018). This variability is due to multiple
factors, including specific NWP conditions, differing project impacts, and applicable WQS. As for RGPs,
States generally issue certifications with or without conditions. Additional review is usually not required
for coverage under a RGP because the Corps Districts develop the RGPs regionally and often incorporate
State conditions.

The Corps issues individual section 404 permits for projects that do not qualify for general permit
authorization or have more than minimal individual or cumulative impacts (USACE n.d.-a). Individual
permits are subject to project-specific certifications. Certifying authorities typically review each
certification request for an individual section 404 permit.

Some States require additional review and an individual certification request for any project, whether it is
being authorized under a general or individual permit, that would involve discharges to certain waters or
is related to a certain activity. For example, Arizona requires individual certification requests for projects
covered under a section 404 permit that would affect an "Outstanding Arizona Water," an impaired or
non-attaining water, or a lake (Arizona Department of Environmental Quality, 2018). North Carolina
requires individual certification requests for all projects covered under a section 404 permit that are
related to oil and gas structures on the outer continental shelf, coal mining, and stormwater management
facilities (North Carolina Department of Environmental Quality, n.d.).

2.1.2	Section 402 NPDES Permits

The NPDES permit program addresses water pollution by regulating point sources that discharge
pollutants to waters of the United States. Section 401 certification only applies when the NPDES permit is
issued by the EPA. A State may receive authorization to administer one or more of the NPDES program
components. The EPA retains administration for the program components for which a State is not
authorized. For example, if the State has not received authorization to issue NPDES permits to federal
facilities, the EPA would continue to issue permits to federal facilities (e.g., military bases, national parks,
federal lands, etc.), and the State would have input on the permit via section 401. The EPA is the sole
NPDES permitting authority for three States (Massachusetts, New Hampshire, and New Mexico), the
District of Columbia, all U.S. territories except the Virgin Islands, and generally on Tribal lands. All other
States and the Virgin Islands have authorization to issue section 402 permits for either the entire NPDES
program or certain components.8 Program components of NPDES include the authority to regulate federal
facilities, pretreatment program, general permits program, and biosolids program (U.S. EPA, 2019b).
Figure A-l in Appendix A shows a map of States and territories and their NPDES program status.

The two basic types of NPDES permits are individual and general permits. Typically, dischargers seeking
coverage under a general permit are required to submit a notice of intent (NOI) to be covered by the
permit. The EPA's general permits cover discharges meeting general permit requirements in areas where
the EPA is the NPDES permitting authority (see U.S. EPA, 2017). The EPA works with certifying
authorities during the development of section 402 general permits to ensure certification is issued.

2.1.3	Interstate Natural Gas Pipeline and Hydropower Project Licenses

Projects requiring interstate natural gas pipeline and hydropower project licenses, which are issued by
FERC (FERC, 2018), are also subject to section 401 certification. Certifying authorities typically review
and act on certification requests for these projects rather than expressly waiving review. There have been

8 Idaho is authorized to issue NPDES permits for individual industrial permits, individual municipal permits, and the
State pretreatment program. Idaho is projected to be fully authorized by July I, 2021.

11


-------
instances where certifying authorities have waived certification for projects requiring a FERC license by
failing or refusing to act within the maximum one-year timeframe (see section 3.2 of this EA). Although
certification denials for projects requiring FERC licenses are rare, a few such denials have garnered
attention. Section 3.1.1 of this EA discusses recent certification denials for natural gas pipelines.

2.1.4	Rivers and Harbors Act Sections 9 and 10 Permits

Rivers and Harbors Act sections 9 and 10 permits cover construction of structures in navigable waters, as
well as work in those waters (e.g., dredging). Section 9 permits authorize construction of bridges and
causeways, which fall under U.S. Coast Guard jurisdiction, as well as dams and dikes, which fall under
Corps jurisdiction.9 Section 10 permits authorize construction of wharfs, piers, dolphins, booms, weirs,
breakwaters, bulkheads, and jetties, which all fall under Corps jurisdiction (USACE, n.d.-b). Section 10
permits may also authorize dredging for navigation.

2.1.5	Nuclear Power Plant Licenses

NRC issues licenses for nuclear power plants that are often subject to section 401 review because they are
typically located adjacent to waters to support the power generation equipment, and they can discharge
cooling water (Energy Information Administration, 2020a). According to the Energy Information
Administration, "[a]s of the end of December 2018, the United States had 98 operating commercial
nuclear reactors at 60 nuclear power plants in 30 states." (2020b).

2.1.6	Mining Licenses

Based on engagements with other federal agencies, the EPA is adding additional description in this final
EA regarding section 401 certifications that may be required for mining licenses. The USDA Forest
Service and BLM are responsible for management of surface resources and government-owned minerals
on National Forest Service lands. The Forest Service and BLM therefore must approve mine plans of
operations before mining activity can take place. Under the final rule, a section 401 certification would be
required if such approvals authorize an activity that may result in a discharge from a point source into a
water of the United States. Other approvals such as section 404 permits may also be required for such
activities. Between 2010 and 2014, the Forest Service and BLM approved 68 mine plans of operations
(GAO, 2016). It is not clear how many of the 68 approvals also required section 401 certification.

2.2 Overview of Certifying Authority Actions

A certifying authority may take four potential actions pursuant to its section 401 authority: grant, grant
with conditions, deny, or waive certification. The Agency does not maintain a national database of
certifying authority actions and therefore does not have available data to quantify the number of actions
that fall into each of these categories.

Section 401 certification decisions have varying effects or consequences on project proponents. When
certifying authorities grant certification or grant with conditions, the effects on project proponents vary
depending on the amount of time taken to review and act on the certification request, license or permit
type, and certification conditions (if applicable).

Denials can be an important option for certifying authorities to protect the quality of waters within their
jurisdiction. However, when certifying authorities deny certification, the effects on project proponents can
be significant. Denials can increase costs to project proponents by delaying projects and causing project
proponents to forgo a project after having invested funds and staff time. Denials for large infrastructure
projects highlight the potential for denials to have broader economic impacts. For instance, public
commenters noted that in the Millennium example case (described in section 3.1.2 of this EA), the project

9 33 U.S.C. 401.

12


-------
proponent sought a water quality certification for six years and as part of that process, spent $15 million
on an EIS. Another public commenter asserted that the Constitution pipeline (described in section 3.1.1 of
this EA) was a $683 million project that was denied certification three years after the initial request was
submitted to the certifying authority. While data to quantify the economic effects of denials are limited,
one study noted that recurring denials of FERC-approved natural gas pipelines may affect transportation
of natural gas and could have an effect on the reliability of gas-fired electric generators (Weiler and
Stanford, 2018). The regulatory uncertainty involving water quality certifications could make it harder for
natural gas pipeline developers to access capital markets, which could hinder needed development and
increase costs for all (Weiler and Stanford, 2018). Additionally, denials can result in litigation costs to
certifying authorities and project proponents when certification decisions are challenged.

When certifying authorities explicitly waive certification, project proponents face no additional effects or
processing times related to the certification process. Under the baseline, certifying authorities can also
waive certification by failing or refusing to act on certification request within the reasonable period of
time, which is established by the federal licensing or permitting agency and can be up to one year.

In the baseline scenario, certifying authorities have generally taken an expansive view of the scope of
review for certifications and evaluated the entire proposed project or activity for compliance with the
listed CWA provisions10 and other requirements of State and Tribal law. Under the baseline, certifying
authorities have also used a water quality certification to address potential non-water quality impacts and
potential impacts from non-point sources of pollution that may be associated with the proposed project, as
well as potential impacts to non-federal waters, including groundwater and isolated wetlands.

Under the baseline, certifying authorities make these determinations as follows:

1)	Grant certification. Certifying authorities grant section 401 certification if they determine that
the overall project or activity will comply with listed provisions of the CWA and other
appropriate requirements of State or Tribal law. Some certifying authorities have taken an
expansive view of "other appropriate requirements of State law" to include non-water quality
provisions of law. When certification is granted by a certifying authority for a federal license or
permit, the federal licensing or permitting agency (hereafter, the "federal agency") may issue the
license or permit.

2)	Grant certification with conditions. Certifying authorities consider and impose limitations or
conditions in their section 401 certifications as necessary to ensure the overall project or activity
will comply with listed provisions of the CWA and any other appropriate requirement of State or
Tribal law. Some certifying authorities have taken an expansive view of conditions that may be
authorized under "other appropriate requirements of State law," including conditions unrelated to
water quality. Some courts have concluded that the federal agency must include all of the
certification conditions in the resulting license or permit. In practice, some certifying authorities
have included conditions on a section 401 certification that are not related to the discharge, the
CWA, or water quality (see final rule preamble section II.G.l.a and III.E.2.c). When a
certification is granted with conditions, the federal agency may issue the license or permit, and
any certification conditions included in the section 401 certification become part of the federal
license or permit.

3)	Deny certification. Certifying authorities deny section 401 certification if they cannot certify that
the overall project or activity will comply with listed provisions of the CWA and other
appropriate requirements of State or Tribal law. Some certifying authorities have taken an

10 33 U.S.C. 1361(a)(1).

13


-------
expansive view of "other appropriate requirements of State law" and have denied certification
based on non-water quality provisions of law. A certification denial prohibits the federal agency
from issuing the license or permit. In practice, some certifying authorities have issued denials for
reasons that not related to the discharge, the CWA, or water quality (see final rule preamble
section II.G.l.a and III.E.2.c). When a certification is denied, the federal agency may not issue
the license or permit.

4) Waive. Certifying authorities may waive section 401 certification, either explicitly through
notification to the project proponent or implicitly by failing or refusing to act on a certification
request within the reasonable period of time. The CWA establishes a timeframe of a reasonable
period that is not to exceed one year for certifying authorities to complete their section 401
certification analysis and decision, and the EPA's 1971 certification regulations11 specify that the
federal agency determines the reasonable period of time within that maximum one-year
timeframe. Under the baseline, certifying authorities have often adopted the practice of relying on
a complete application, as defined by the certifying authority, to start the clock and begin their
review. In some cases, there has been confusion about what constitutes a complete application
and what is required to start the clock for the reasonable period of time (see section 3.2 of this
EA). A waiver does not necessarily indicate a certifying authority's opinion regarding the
potential water quality implications of an overall project or activity since a certifying authority
may waive certification for a variety of reasons, including a lack of resources to evaluate the
request. When certifying authorities waive certification, the federal agency may issue the license
or permit without an affirmative certification from the certifying authority.

Some federal agencies have promulgated regulations establishing the reasonable period of time for
certifying authorities to act on certification requests associated with their license or permit processes. For
example, the Corps' regulations provide a 60-day reasonable period of time for section 401 certification
reviews associated with section 404 permits,12 and the Corps released a 2019 Regulatory Guidance Letter
(RGL) reinforcing this timeframe (USACE, 2019). FERC regulations provide a full year for certifying
authorities to act on a certification request.13 The EPA regulations governing certification for federally-
issued section 402 NPDES permits provide certifying authorities 60 days to act on a section 401
certification request associated with a draft permit.14 The EPA's 1971 certification regulations established
a default timeframe of six months.15

Under the baseline, certifying authorities have commonly used different approaches when they need more
time for review than has been provided by the federal agency or authorized by section 401, including:

1) Determining that a request is incomplete until the certifying authority is prepared to review or
issue the certification.

11	40 CFR 121.16(b).

12	33 CFR 325.2.

13	18 CFR 4.34(b)(5)(iii).

14	40 CFR 124.53(c)(3).
1540 CFR 121.16(b).

14


-------
2)	Restarting the clock by coordinating to have the project proponent withdraw and resubmit the
certification request. The recent Hoopa Valley Tribe v. FERC16 decision concluded this practice is
inconsistent with section 401 (see section II.F.4.b of the preamble for the final rule).

3)	Denying certification without prejudice when they lack data or information they believe is
necessary for their analysis and then encouraging the project proponent to resubmit the request
once data gaps have been addressed.

Using these practices to extend the reasonable period of time, sometimes beyond the statutory one-year
limit, may result in project delays that ultimately increase costs for project proponents. The EPA does not
maintain a national database on certification decisions or timeframes, and therefore is unable to estimate
how many projects are delayed by the practices described above. However, commenters on the proposed
rule provided examples of substantial project delays in some cases. Other commenters asserted that most
certification decisions are made within one year, but some of these commenters also stated that one year
may not be enough time for certifying authorities to act on certification requests for complex projects.

These practices also lead to uncertainty about when the reasonable period of time begins and ends. Recent
New Y ork State natural gas pipeline certification denial cases (see section 3.1.1 of this EA) and West
Virginia's failure to act within the reasonable period of time (see section 3.2 of this EA) demonstrate that
the baseline practice of requiring a complete application to start the clock can cause confusion, delays,
and unintentional waiver. While the EPA does not have data on how commonly unintentional waivers and
project delays occur, the example cases demonstrate that the magnitude of the impacts can be high.

During the pre-proposal period and public comment period for the proposed rule, the Association of
Clean Water Administrators (ACWA)17 submitted the summary of a survey it conducted of the 50 States
about their section 401 certification processes, including the average annual number of certification
requests and denials, certification timeliness, request completeness, and best practices (ACWA, 2019).
Thirty-one States responded to the ACWA survey. According to these survey responses, the average
length of time for States to issue a certification decision is 132 days after they receive a complete request.
This is an average across certifications for all license and permit types. States responding to the ACWA
survey cited incomplete certification requests as the most common reason for delays, but the survey did
not provide data on the average amount of time it took from the original request to conclude that a request
is "complete." Results from the ACWA survey also indicate that denials are uncommon in States that
responded, with 17 States averaging zero denials per year and other States issuing denials rarely (ACWA,
2019). A 2011 review of Wisconsin's section 401 certification program found that Wisconsin denied
approximately 2 percent of certification requests in 2009 and 2010 (ASWM, 201 la). During this
timeframe, the most common cause cited by Wisconsin for the denials was the availability of a practical
alternative that would better allow the project proponent to avoid or minimize impacts to wetlands
(ASWM, 201 la). A similar review of Delaware's section 401 certification program in 2010 found that
Delaware had not recently issued any denials (ASWM, 201 lb). A summary of additional survey
information was made available by the Western States Water Council (Western States Water Council,
2014). This survey suggests that in the following States denials are uncommon: Alaska, Arizona,
California, Colorado, Idaho, Kansas, Montana, Nevada, New Mexico, Oklahoma, Oregon, South Dakota,
Texas, Utah, and Wyoming.

16	Hoopa Valley Tribe v. FERC, 913 F.3d 1099 (D.C. Cir. 2019), cert, denied, 140 S.Ct. 650 (2019).

17	ACWA is a national organization representing the State, Interstate and Territorial officials who are responsible for
the implementation of surface water protection programs throughout the nation.

15


-------
These summary survey data do not adhere to the EPA's requirements regarding data and information
quality (U.S. EPA, 2001) (e.g., requirements guiding data generation and acquisition, data validation and
usability, etc.) and therefore are not relied upon to support the EPA's rulemaking. However, due to a lack
of existing national data on section 401 processes that is discussed in greater detail in section 6 below,
these results are, nonetheless, useful for considering baseline practices and estimating potential impacts of
this final rule.

3 Section 401 Certification Example Cases Under Baseline

This section describes examples of section 401 certification denials (section 3.1) and circumstances where
a certifying authority failed to act (section 3.2). Each of these cases occurred under EPA's 1971
regulations and all but one was described in the proposed EA.

A few commenters suggested that a few, unique, non-representative cases were listed in the proposal as
examples of a problem with the section 401 process, but they stated that thousands of section 401
certifications are issued annually without raising any concerns. One commenter said that the EPA should
have analyzed all federal license and permit types subject to section 401. Another commenter said that the
EPA should analyze a representative sample of section 401 decisions that would be altered under the
proposed rule and noted that the current analysis did not include any non-fossil fuel projects.

In response to commenters requesting additional example cases beyond the fossil fuel energy project
denials discussed in section 4 of the proposed EA, the Agency has added an example case of a certifying
authority failing to act on a certification request for two hydropower projects in West Virginia (see
section 3.2 of this EA). As noted in the preamble to the final rule, the EPA acknowledges that many
certifications reflect an appropriately limited interpretation of the purpose and scope of section 401 and
are issued without controversy. However, these example cases demonstrate that there is existing
confusion about the timeline and scope of section 401 under the 1971 certification regulations, which has
led to project delays and increased project costs. Section 5 of this EA discusses how the clarity and
regulatory certainty provided by the final rule provisions could have changed the outcomes in these
example cases.

See the Agency's Response to Comments document in the docket for the final rule (Docket ID No. EPA-
HQ-OW-2019-0405) for a full public comment summary and Agency responses.

3.1 Examples Where a Certifying Authority Denied Certification

This section describes four recent examples of energy-related section 401 certification denials. The four
denials presented in this section include three natural gas pipelines in New York State (section 3.1.1) and
a coal export terminal in Washington State (section 3.1.2).

3.1.1 New York Natural Gas Pipelines

FERC regulates natural gas pipeline market entry under the Natural Gas Act (NGA) by issuing a section
7(c) certificate of public convenience and necessity authorizing the construction of new facilities (Weiler
and Stanford, 2018). Under the Energy Policy Act of 2005,18 FERC has the authority to set a schedule for
federal and State agencies to reach a final decision on requests for authorizations necessary for proposed
natural gas pipeline projects. The Energy Policy Act of 2005 also specified that in cases in which another
agency delays issuing a required permit, the United States Court of Appeals for the D.C. Circuit has
exclusive jurisdiction to address the matter.

18 119 Stat. 594; P.L. 109-58; 42 U.S.C. 15801.

16


-------
FERC more recently granted NGA section 7(c) certificate authorization for the construction of three
different interstate natural gas pipeline projects in New York State. FERC conducted environmental
reviews, including analyses of each project's potential impact on water resources, and found that
construction and operation of each project would result in no significant environmental impacts (Weiler
and Stanford, 2018). The New York State Department of Environmental Conservation (NYSDEC) took a
contrary position and denied issuance of section 401 certification for all three projects (Weiler and
Stanford, 2018). Table 3-1 summarizes the three natural gas pipeline cases.

Table 3-1: Section 401 certification denial cases

Project
Description

Request Timeframe

Reasons for Denial

Current Status

Constitution
Pipeline: 124-
mile pipeline
from

Susquehanna

County, PA, to

Schoharie

County, NY,

that would

provide

650,000

dekatherms/

day of firm

transportation

service.

Project proponent filed a
section 401 certification
request on August 22,
2013. NYSDEC requested
additional information
until it considered the
request complete in
December 2014. In April
2015, NYSDEC requested
the project proponent to
withdraw and resubmit
the request to restart the
maximum one-year
reasonable period of
time.

NYSDEC issued a denial in
April 2016, stating that the
certification request failed
to address significant water
resource impacts that could
occur from the project and
failed to demonstrate
compliance with NY's WQS.

Project proponent appealed
NYSDEC's decision to the U.S.

Court of Appeals for the Second
Circuit, but the court upheld the
denial. The Hoopa Valley ruling
(see section II.F.4.b of preamble
for the final rule) opened the
possibility that NYSDEC waived
certification by exceeding the
maximum one-year timeframe. In
February 2019, U.S. Court of
Appeals for the D.C. Circuit
granted FERC's request to remand
the certification waiver question
to FERC for a new review. In
August 2019, FERC found that
NYSDEC had, in fact, waived its
authority to issue a certification.
On December 30, 2019, NYSDEC
appealed the FERC waiver decision
to the Second Circuit. On April 8,
2020, the Second Circuit ordered
that the case be held in abeyance
until the earlier of (1) December 2,
2020, when the FERC certificate of
public convenience expires, or (2)
the court's receipt of written
notification from the petitioners of
another change of circumstances
warranting reinstatement of the
cases.

Valley Lateral
Pipeline: 7.8-
mile extension
of an existing
pipeline in
Orange
County, NY to
serve a new
gas-powered

Project proponent filed
section 401 certification
request on November 13,
2015. NYSDEC initially
deemed the request
incomplete and
requested additional
information through
August 2016. Project

In August 2017, NYSDEC
denied the project
proponent's request on the
grounds that FERC's
environmental review of
the project was inadequate
because it failed to consider
downstream greenhouse

Project proponent waited until
July 2017 before submitting a
request to FERC to proceed with
construction, arguing that NYSDEC
had waived certification. In
September 2017, FERC issued an
order stating that NYSDEC had
waived certification by exceeding
the maximum one-year

17


-------
Table 3-1: Section 401 certification denial cases

Project

Request Timeframe

Reasons for Denial

Current Status

Description







power plant in

proponent urged NYSDEC

gas emissions from the

reasonable period of time and

Wawayanda,

to complete its review

electric generator shipper.

issued a Notice to Proceed with

NY.

after receiving FERC



Construction. Despite the prior



authorization in



ruling by the U.S. Court of Appeals



November 2016, but



for the D.C. Circuit, NYSDEC



NYSDEC said it had until



appealed FERC's decision to the



August 2017 to make a



U.S. Court of Appeals for the



determination. In June



Second Circuit, but in March 2018



2017 the U.S. Court of



the court ruled in FERC's favor.



Appeals for the D.C.



884 F.3d 450 (2nd Cir. 2018). In



Circuit held that, in light



July 2018, FERC authorized the



of NYSDEC's alleged



project proponent to place the



waiver of certification



new pipeline into service.



due to failure to act







within one year, the







project proponent lacked







standing to seek an order







to compel NY State to act







on its request for







certification.





Northern

Project proponent filed

In April 2017, NYSDEC

The project proponent has

Access

section 401 certification

denied the project

appealed FERC's revised

Pipeline:

request in February 2016.

proponent's request for

certification denial to the Second

Project

After NYSDEC did not

failing to demonstrate

Circuit. That appeal is currently

includes 99

notify the project

compliance with State WQS,

being held in abeyance, pending

miles of

proponent about

asserting that the project

resolution of NYSDEC's separate

pipeline from

whether the request was

did not adequately mitigate

appeal to the Second Circuit of

Sergeant

complete, the project

impacts to water quality,

FERC's August 2018 and April 2019

Township, PA

proponent agreed to a

jeopardized biological

decisions that NYSDEC waived

to Elma, NY

March 2, 2016 date of

integrity, and impeded best

certification by not acting within

and ancillary

receipt if NYSDEC issued a

uses of affected

one year. That waiver appeal is

facilities to

decision within the next

waterbodies. Following an

pending; all final form briefs are

expand firm

year. In January 2017,

appeal to the Second Circuit

due to the Second Circuit by June

service by

NYSDEC asked the project

and a February 5, 2019

9, 2020.

847,000

proponent to amend the

remand of the FERC



dekatherms/

prior agreement so that

certification denial, NYSDEC



day.

April 8, 2016 would be

issued a revised denial in





the date of receipt

August 2019. Based on "a





instead of March 2, and

thorough evaluation of the





the project proponent

Application as well as





complied. After receiving

supplemental submissions,"





the amendment, NYSDEC

NYSDEC concluded that





deemed the request

"the Application fails to





complete.

demonstrate compliance







with New York State water







quality standards."



18


-------
3.1.2 Millennium Bulk Terminals in Washington State

Millennium Bulk Terminals—Longview, LLC (Millennium) proposed to construct and operate an export
terminal in Cowlitz County, Washington, along the Columbia River (USACE, 2016). The proposed
export terminal would receive rail shipments of coal from the Powder River Basin in Montana and
Wyoming, and the Uinta Basin in Utah and Colorado. Export terminal employees would receive, blend,
and load coal onto vessels in the Columbia River for export. The proposed export terminal would have a
maximum throughput of 44 million metric tons of coal per year. The purpose of the proposed project was
to transfer western U.S. coal from rail to ocean-going vessels for export to Asia. Millennium identified
demand within the Asian market for western U.S. low-sulfur subbituminous coal and determined that
existing West Coast terminals were unavailable to serve this need (USACE, 2016).

3.1.2.1	Water Quality Certification Denial

Millennium first submitted a section 404 permit request to the Corps and a section 401 certification
request to the Washington Department of Ecology in February 2012 via a Joint Aquatic Resources Permit
Application (JARPA), which serves as a joint application for federal, State, and local aquatic resource
permits.19 Millennium withdrew its JARPA in February 2013 at the Corps' request to allow the federal
agency more time to complete its regulatory process. Id. Millennium intended to resubmit after the
environmental review process (Washington Department of Ecology, 2019), and resubmitted its JARPA in
July 2016. In September 2016, the Corps issued a draft Environmental Impact Statement (EIS) for the
proposed project under the National Environmental Policy Act (NEPA). Cowlitz County and the
Washington Department of Ecology also issued an EIS under the State Environmental Policy Act in April
2017 (Washington Department of Ecology, 2019). As noted by a public commenter on the proposed rule,
the State' s EI S concluded in section 4.1.5.8 that compliance with laws and implementation of the
measures and design features described throughout section 4 of the EIS would reduce impacts on water
quality, and there would be no unavoidable and significant adverse environmental impacts on water
quality (Cowlitz County and Washington Department of Ecology, 2017). In September 2017, the
Washington Department of Ecology denied section 401 certification for the project and asserted that the
project would have unavoidable, adverse impacts to the local environment, transportation, public health,
the local community, and Tribal resources as a result of not meeting State WQS (Washington Department
of Ecology, 2019).

3.1.2.2	Current Status

To date, all court challenges to the section 401 certification denial have resulted in rulings favorable to the
Department of Ecology. Millennium appealed the denial to Cowlitz County Superior Court and the
Washington State Pollution Control Hearings Board. The Cowlitz County Superior Court dismissed
Millennium's appeal in March 2018, stating that the appeal must first be heard by the Pollution Control
Hearings Board (Washington Department of Ecology, 2019). The Pollution Control Hearings Board ruled
in Washington Department of Ecology's favor in August 2018.20 Millennium submitted a second appeal
to the Cowlitz County Superior Court following the Pollution Control Hearings Board's ruling.
Millennium also filed a challenge in Federal District Court against the Department of Ecology director,
the Department of Natural Resources commissioner, and Washington's Governor Inslee, arguing that the
denial interfered with foreign and interstate commerce21 . The federal court dismissed the case against the

19	Millennium Bulk Terminals Longview, LLC v. Washington State Department of Ecology. Docket 18-2-00994-08.
Petition for Review.

20	Millennium Bulk Terminals—Longview, LLC v. State of Washington, Department of Ecology, PCHB No. 17-090
(2019).

21	Lighthouse Resources, Inc. v Inslee, No. 3:18-cv-05005-RJB (W.D. Wash. Dec. 11, 2018)

19


-------
Department ofNatural Resources commissioner in October 2018. Id. In December 2018, the federal court
granted summary judgment against a portion of Millennium's claims by determining that the State of
Washington's denial did not violate two federal laws, the Interstate Commerce Commission Termination
Act and the Ports and Waterways Safety Act.22 Millennium has appealed those rulings to the Ninth
Circuit Court of Appeals (Docket No. 19-35415). As of March 27, 2020, the district court case was stayed
and the appeal was still pending.

Although Washington denied section 401 certification for the proposed export terminal, the Corps
restarted the federal permitting and environmental review process in November 2018 (Washington
Department of Ecology, 2019). This decision prompted the Washington State Attorney General to send a
letter to the Corps Lieutenant General expressing concern that restarting the permitting process undercuts
the federalism partnership in the CWA and section 401 (Ferguson, 2018). The Corps' efforts to update the
EIS and coordinate compliance with section 106 ofNHPA are ongoing.23

A commenter on the proposed EA maintained that the proposal misrepresented the facts surrounding the
Millennium certification, and that the terminal project has been independently rejected by two other
decision-makers on State law grounds. The commenter asserted that this means the coal terminal could
not be built regardless of whether the company had received a section 401 certification. The final EA
reflects more recent developments regarding the facts of the Millennium CWA certification. While it is
true that a number of State permits for the project have been denied by State officials, it is also true that,
regardless of the final disposition of those matters, unless overturned by a court of competent jurisdiction,
the State's denial with prejudice of Millennium's CWA section 401 certification request prevents the
project from going forward as a matter of federal law.

3.2 Examples Where a Certifying Authority Failed to Act

On February 27, 2014, the Free Flow Power Corporation (FFP) filed applications with FERC for the
construction and operation of six hydropower projects to be located at the Corps' dams on the
Monongahela River.24 Two of these hydropower projects would occur in West Virginia, while four would
occur in Pennsylvania. The six Monongahela River Projects would provide hydroelectric generation to
meet part of West Virginia's and Pennsylvania's power, resource diversity, and capacity needs. The
projects would have a combined installed capacity of 53 MW, and over the term of the licenses would
generate an average of about 213,300 MWh per year (FERC, 2016).

On February 12, 2016, the West Virginia Department of Environmental Protection (WV DEP) received
water quality certification requests from FFP for the Morgantown and Opekiska projects.25 On March 9,
2016, WV DEP deemed the applications complete and stated that, per West Virginia regulations, it had
one year from that date to act on FFP's requests. On March 8, 2017, WV DEP issued section 401 water
quality certifications with 18 conditions for the projects. However, FERC staff determined that, by not
acting on FFP's requests within a year of receiving them, WV DEP waived certification. Despite WV
DEP's reliance on West Virginia regulations, FERC staff explained that the EPA's 1971 certification
regulations and FERC's certification regulations clearly state that the triggering event for the maximum
one-year timeframe is the day the certifying authority receives the request for water quality certification.
WV DEP thus needed to issue a determination by February 12, 2017, to avoid waiving its authority. Since

22	Case No. 3:18-CV-05005-RJB, United States District Court, Western District of Washington at Tacoma (2019).

23	Personal communication US ACE.

24	162 FERC 1(61,237.

25	Id.

20


-------
WV DEP had not issued the water quality certifications until March 8, 2017 and FERC concluded that
WV DEP had waived certification, the conditions included in the late-issued certifications had no effect.
Ultimately, FERC did not include WV DEP's conditions in either license. On October 27, 2017,
Morgantown, West Virginia and River Conservancy requested rehearing of the License Orders, arguing
that FERC erred in its determination that WV DEP waived certification. On March 15, 2018, FERC
denied the rehearing request, reaffirming the original reasoning that WV DEP waived certification by
failing to act on the request within one year of receipt.26

The certification waivers in these cases resulted from differing interpretations about the triggering event
for the maximum one-year reasonable period of time. Section 401 of the CWA, the EPA's 1971
certification regulations, and FERC's certification regulations clearly state that receipt of the request starts
the reasonable period of time. However, like many certifying authorities, WV's State regulations provide
that the reasonable period of time does not start until it receives a complete request. These differing
interpretations resulted in the certifying authority unintentionally waiving certification, which prevented
the certifying authority from adding conditions to the water quality certifications. The project proponent
was also affected by the differing interpretations because the water quality certification review was
delayed beyond the maximum one-year reasonable period of time, leading to delay and additional
uncertainty. This outcome also underscores the importance of early communication between the
certifying authorities and the federal licensing or permitting agency to ensure that all parties understand
the timeline within which action on a certification request must occur.

4 Potential Effects of the Final Section 401 Certification
Regulations

The EPA is finalizing revisions to its 1971 certification regulations, presented here across the three
categories of timeframe, scope, and pre-filing meeting requests. These sections do not discuss the
provisions that only apply to the EPA as the certifying authority since these provisions affect a small
number of section 401 certification requests.27 Sections 4.1 through 4.3 of this EA provide additional
details about the generally applicable final rule provisions, and section 4.4 focuses on potential effects of
the final rule on federal agencies, States, and Tribes. This section of the EA has been updated to
incorporate provisions from the final rule and to respond to public comments on the proposal.

The requirements for when certification is required are set out in section 401 and have not changed from
the 1971 regulations. As a result, the Agency does not expect that these final rule provisions will change
the number of certification requests when compared with the baseline scenario. The Agency does not
have data to estimate the number of certification actions (grant, grant with conditions, deny, or waive) per
year, nor does the Agency have data to suggest how these actions will change under the final rule. EPA
has used the number of federal licenses and permits issued as an indicator of how many certifications may
be granted or waived annually, but that number would not account for certification requests that may have
been denied or certification requests that were withdrawn and resubmitted.

As described in section 2 of this EA, external surveys and commenters on the proposal have suggested
that certification denials are rare. The Agency acknowledges commenter concerns that the clear
timeframe provisions in the final rule may lead to more denials, but the Agency believes that any new

26	Id.

27	On average, the EPA estimates it performs 54 CWA section 401 water quality certification decisions per year for
projects on Tribal lands where the Tribe does not have TAS.

21


-------
pressure on a certifying authority to deny within the reasonable period of time will be offset by the
benefits of the pre-filing meeting requirements described in section 4.3.2 of this EA. Additionally, the
final rule may reduce the number of denials that are based on information that is beyond the scope of
certification (e.g., considerations unrelated to the discharge). As such, the EPA expects denials will
continue to be rare under the final rule.

By clarifying the timeframe for certifying authorities to act on certification requests under the final rule,
the Agency anticipates more predictability in the certification process, including certainty about when
project proponents should expect a decision on a certification request. Additionally, including clear
information requirements for denials in the final rule will allow the project proponent to understand the
basis for denial and have an opportunity to modify the project or to provide new or additional information
in a new certification request.

As discussed below, the Agency anticipates that the final rule will result in more predictable, efficient
decision-making by certifying authorities as compared with the baseline scenario discussed in section 2 of
this EA. The final rule may reduce some flexibility for certifying authorities, for instance by defining a
"certification request" that starts the reasonable period of time and precluding certifying authorities from
unilaterally extending the reasonable period of time. This final rule may impose some new burden if
project proponents decide to resubmit applications that were rejected by certifying authorities within the
newly clarified reasonable period of time. The final rule may also impose some new burden on project
proponents by requiring a pre-filing meeting request be filed with certifying authorities at least 30 days
before submitting a certification request. However, the Agency expects that the overall benefits of the
final rule will result in reduced information and review burden for certifying authorities, reduced
regulatory burden for project proponents, and a net decrease in overall costs for the certification process.
The final rule reduces the burden placed on certifying authorities through the clearer scope of
certification, affirming that the reasonable period of time does not exceed one year, and establishing the
pre-filing meeting request requirement. Additionally, the final rule helps ensure that certification
conditions are enforceable by the federal agency issuing the license or permit with those conditions,
potentially relieving certifying authorities of the burden and cost of enforcement and oversight.

By clarifying ambiguities in CWA section 401, the final rule also serves to simplify and normalize the
certification process for certifying authorities. The final rule is expected to increase regulatory certainty,
reduce costs, and minimize delays for project proponents, including small entities. The EPA further
determined that improved clarity on the scope of section 401 will likely make the certification process
more efficient for project proponents and certifying authorities alike, resulting in a net reduction in
regulatory burden and costs. Therefore, the Agency does not expect the cost of the rule to result in
significant economic impact on a substantial number of small entities. Given these expected outcomes
and pursuant to Executive Order 13771 (82 FR 9339, February 3, 2017), the EPA considers the final rule
to be a deregulatory action.

Table 4-1 summarizes potential effects of the final rule on certifying authorities and project proponents as
compared with the baseline scenario.

22


-------
Table 4-1. Summary of potential effects of final section 401 revisions

Final Rule

Certifying Authorities

Project Proponent











rrovision ana









IV1 rtt CrAnnmir

Potential

Potential

Potential

Potential

IXcl ClUIIUIIMl

Effect

Improvements

Consequences

Improvements

Consequences

Timeframe: Net

Improved clarity of when

Less time to

Certainty that the

More denials

Reduction in

the clock starts; less

collect and

certification process



Costs

litigation about delays;

generate

will not exceed the





fewer unintended waivers

information to

maximum of one year;







inform decisions;

improved clarity of







may lead to more

when the clock starts;







denials or waivers

less litigation about









delays and if waiver









occurred



Scope: Net

Less burden to request

Increased

Less burden to

No substantial

Reduction in

and evaluate out of scope

litigation if

generate and produce

consequences

Costs

information, including

conditions or the

out of scope

anticipated



effects of the overall

reasons for denial

information, including





project or activity on non-

extend beyond

effects of the overall





point discharges to non-

the scope of

project or activity; on





WOTUS; and on air quality,

certification;

non-point discharges





transportation and other

waiver of

to non-WOTUS; and





non-water quality impacts;

conditions or

on air quality,





less litigation about what

denials may occur

transportation and





is the appropriate scope of

if certifying

other non-water





a certification review;

authorities do not

quality impacts; less





shorter section 401

provide the three

litigation about what





certification review times;

elements to

is the appropriate





certification condition

support a denial

scope of a certification





elements may increase

and two elements

review; shorter





enforceability of

to support

section 401





certification conditions;

certification

certification review





denial elements build a

conditions

times; fewer non-





strong record of denial



water quality





decision-making



conditions on









certification



Pre-Filing

May result in fewer

Not all certifying

Pre-filing meetings

Minimal

Meeting

incomplete certification

authorities may

help establish data

increased labor

Request

requests and provide

have the

needs for a timely

burden to

Requirement:

advance notice of

budget/capacity

review; promote early

request meeting

Net Reduction

requests; promote early

to support pre-

engagement with

and attend if

in Costs

engagement to

filing meetings

certifying authority

accepted;



understand proposed



before the reasonable

potential



projects before the



period of time begins;

additional



reasonable period of time



facilitate relationship

fee/burden if



begins; facilitate



development and

certifying



relationship development



rapport between

authorities



and rapport between



certifying authorities

charge fees for



certifying authorities and



and project

pre-filing



project proponents



proponents

meetings

23


-------
4.1 Timeframe

4.1.1 Final Rule Provisions

The CWA states that certifying authorities must act on a request for certification "within a reasonable
period of time (which shall not exceed one year) after receipt of [a certification] request."28 The EPA's
1971 certification regulations (section 121.16(b)) specify that the federal licensing or permitting agency
determines the reasonable time period within that maximum one-year timeframe, and the final rule
reaffirms this requirement. In addition, the final rule clarifies that the reasonable period of time to act on a
section 401 certification begins after receipt by the certifying authority of a "certification request," as
defined in the final rule.

The final rule contains specific information requirements that must be submitted in a written certification
request to start the reasonable period of time. If any of the requirements are missing from the certification
request, the statutory reasonable period of time does not start. The final rule contains different
certification request requirements for individual licenses and permits and for the issuance of general
licenses and permits.

For an individual license or permit, the project proponent must submit a written request for certification to
the certifying authority that includes the following information (including seven components similar to
those in the proposed rule and two new components in bold):

1.	identify the project proponent(s) and a point of contact;

2.	identify the proposed project;

3.	identify the applicable federal license or permit;

4.	identify the location and nature of any potential discharge that may result from the
proposed project and the location of receiving waters;

5.	include a description of any methods and means proposed to monitor the discharge and
the equipment or measures planned to treat, control, or manage the discharge;

6.	include a list of all other federal, interstate, tribal, state, territorial, or local agency
authorizations required for the proposed project, including all approvals or denials
already received;

7.	include documentation that a pre-filing meeting request was submitted to the
certifying authority at least 30 days prior to submitting the certification request;

8.	contain the following statement: 'The project proponent hereby certifies that all
information contained herein is, true, accurate, and complete to the best of my
knowledge and belief'; and

9.	contain the following statement: 'The project proponent hereby requests that the
certifying authority review and take action on this CWA 401 certification request within
the applicable reasonable period of time.'

For issuance of a general license or permit, the project proponent must submit a written request for
certification to the certifying authority that includes the following information (including seven
components similar to those in the proposed rule and two new components in bold):

1)	identify the project proponent(s) and a point of contact;

2)	identify the proposed categories of activities to be authorized by the general license or
permit for which certification is requested;

3)	include the draft or proposed general license or permit;

28 3 3 U.S.C. 1341(a)(1).

24


-------
4)	estimate the number of discharges expected to be authorized by the proposed general
license or permit each year;

5)	include documentation that a pre-filing meeting request was submitted to the
certifying authority at least 30 days prior to submitting the certification request;

6)	contain the following statement: 'The project proponent hereby certifies that all
information contained herein is true, accurate, and complete to the best of my
knowledge and belief'and

7)	contain the following statement: 'The project proponent hereby requests that the
certifying authority review and take action on this CWA 401 certification request within
the applicable reasonable period of time!

The final rule clarifies the procedures by which federal agencies communicate the reasonable period of
time to certifying authorities. Under final rule section 121.6(b), within 15 days of receiving the notice of
the certification request from the project proponent, the federal agency shall provide, in writing, the
following information to the certifying authority: the date of receipt, the applicable reasonable period of
time to act on the certification request, and the date upon which waiver will occur if the certifying
authority fails or refuses to act on the certification request.

Additional final rule revisions reinforce that the maximum reasonable period of time is one year from
receipt of the certification request. The final rule also prohibits a certifying authority from taking actions
to extend the maximum timeframe beyond one year from receipt of the certification request, thereby
precluding the coordinated withdrawal and resubmittal practices that occur under the baseline scenario, as
described in section 2.2 of this EA.

4.1.2 Potential Effects - Timeframe

For both certifying authorities and project proponents, the final rule provides clarity regarding the start of
the review clock and reduces uncertainty and potential litigation about whether the reasonable period time
has begun and whether certifying authorities waived certification by failing or refusing to act within the
reasonable period of time. Recent New York State natural gas pipeline certification denial cases (see
section 3.1.1 of this EA) and West Virginia's failure to act within the reasonable period of time (see
section 3.2 of this EA) demonstrate that the baseline practice of requiring a complete application to start
the clock can cause confusion, delays, and unintentional waivers. In these cases, the certifying authority
requested additional information from the project proponent or spent time reviewing the request before
deeming the request complete and starting the statutory clock. FERC ultimately ruled in these cases that
the certifying authority had waived certification by failing to act within the one-year reasonable period of
time.

The EPA anticipates that defining "certification request" and including specific elements of a certification
request in section 121.5(b) and (c) of the final rule will reduce confusion about when the clock starts and
ends, reduce delays, and reduce unintentional waivers by certifying authorities as compared with the
baseline scenario. Additionally, the final rule includes specific procedures by which federal agencies
communicate the reasonable period of time under the final rule, including the date upon which waiver
will occur if the certifying authority fails or refuses to act. Increased clarity will also ensure that certifying
authorities have the opportunity to protect water quality from the impacts of federally licensed or
permitted projects, rather than unintentionally waiving certification.

The final rule provides additional clarity about the timeframe, including the maximum reasonable period
of time and when the statutory clock begins. These provisions are expected to reduce delays and could
yield additional cost savings. Extended delay while waiting for an action on a certification request is an
opportunity cost to the project proponent, meaning that sidelined investment funds awaiting action could

25


-------
have been invested elsewhere. The sooner the project proponent knows of a denial, the sooner alternative
investments can be considered which could generate benefits. Similarly, timely certifications and issuance
of a federal license or permit can allow proposed projects to begin generating benefits sooner. In addition,
legal risk and associated costs could also be reduced by increased regulatory clarity and transparency as
well as by better defining milestones and responsibilities. Project proponents and certifying authorities are
likely to benefit from clear regulations and face less legal risk associated with poorly defined certification
processes.

The EPA expects that the definition of "certification request" and including specific elements of a
certification request in section 121.5(b) and (c) of the final rule could, in cases where State or Tribal law
may have more broad or open-ended information requirements for a complete application, reduce the
burden placed on project proponents and certifying authorities. More clear and transparent requirements
allow all entities to make decisions with symmetrical information which should lead to reduced
ambiguity, confusion, and delay. While States could still require additional information from project
proponents, the section 401 water quality certification process and its unambiguous timeframe would not
be unnecessarily burdened or impeded by any such additional information collection.

The final rule makes it clear that certifying authorities are not authorized to request the project proponent
to withdraw a certification request or to take any other action (other than specified in final rule section
121.6(d)), formally or informally, to modify the reasonable period of time. By specifically addressing the
withdrawal and resubmittal mechanism previously used to extend the reasonable period of time beyond
the statutory maximum one year, the EPA expects that certification requests will be acted upon within the
reasonable period of time, allowing for a more streamlined and transparent process. If a certifying
authority approaches the end of the maximum one-year timeframe and is unable to certify a section 401
certification request, two options remain available: denial or waiver. The final rule reaffirms the ability of
a project proponent to submit a new certification request if a previous request is denied. By clarifying the
timeframe for certifying authorities to act on certification requests under the final rule, the Agency
anticipates more predictability in the certification process, including certainty about when project
proponents should expect a decision on a certification request. The final rule's requirements that certain
information be included in a certification denial will assist the project proponent in submitting a new
request for certification that addresses the water quality issues identified in the denial. The process
improvements included in the final rule will increase clarity and regulatory certainty as compared with the
practices described in the baseline scenario (see section 2 of this EA).

The EPA received public comments that establishing that the reasonable period of time begins after
receipt of a certification request and precluding the withdrawal and resubmittal approach for extending
the reasonable period of time could lead to more denials. Some States submitted public comments
asserting that they may choose to deny certification rather than make a certification determination without
complete information or risk inadvertently waiving certification. The Agency understands the concerns
raised by these commenters but, as described in the final rule preamble in section III.C, the list of
information and materials required in a certification request is not an exhaustive list of materials that may
be necessary to make a certification decision. Certifying authorities can request additional information
from project proponents, so long as they act on the certification request within the reasonable period of
time. The EPA also expects that pre-filing meetings will provide an important opportunity for certifying
authorities and project proponents to discuss the proposed project and potential information needs prior to
the start of the reasonable period of time.

26


-------
4.2 Scope

4.2.1 Final Rule Provision

Under section 121.3 of the final rule, "[t]he scope of a Clean Water Act section 401 certification is limited
to assuring that a discharge from a Federally licensed or permitted activity will comply with water quality
requirements." "Water quality requirements" is defined in the final rule to mean applicable provisions of
sections 301, 302, 303, 306, and 307 of the Clean Water Act, and State or Tribal regulatory requirements
for point source discharges into waters of the United States. See final rule preamble section III.E for a full
analysis of the final scope of certification.

To provide transparency to the project proponent and the public, and to provide a framework for
certifying authorities to act within the scope of certification, final rule section 121.7(d) provides that for
each condition, a certification must include the following supporting information:

1)	For certification conditions on an individual license or permit,

a.	A statement explaining why the condition is necessary to assure that the discharge from
the proposed project will comply with water quality requirements; and

b.	A citation to federal, state, or tribal law that authorizes the condition.

2)	For certification conditions on issuance of a general license or permit,

a.	A statement explaining why the condition is necessary to assure that any discharge
authorized under the general license or permit will comply with water quality
requirements; and

b.	A citation to federal, state, or tribal law that authorizes the condition.

To provide transparency to the project proponent and the public, and to provide a framework for
certifying authorities to act within the scope of certification, final rule section 121.7(e) provides that a
denial must include the following supporting information:

1)	For denial of certification for an individual license or permit,

a.	The specific water quality requirements with which the discharge will not comply;

b.	A statement explaining why the discharge will not comply with the identified water
quality requirements; and

c.	If the denial is due to insufficient information, the denial must describe the specific water
quality data or information, if any, that would be needed to assure that the discharge from
the proposed project will comply with water quality requirements.

2)	For denial of certification for issuance of a general license or permit,

a.	The specific water quality requirements with which discharges that could be authorized
by the general license or permit will not comply;

b.	A statement explaining why discharges that could be authorized by the general license or
permit will not comply with the identified water quality requirements; and

c.	If the denial is due to insufficient information, the denial must describe the types of water
quality data or information, if any, that would be needed to assure that the range of
discharges from potential projects will comply with water quality requirements.

Under the final rule, the federal agency responsible for issuing the license or permit will review
certification conditions and denials to determine if they include the required supporting information. The
federal agency may waive any certification condition for which the required documentation is not
included, although waiving a certification condition does not invalidate the entire certification. The

27


-------
federal agency may also treat a denial that does not include the required documentation as a waiver.

While the requirements in the final rule to include supporting information for a certification condition or
denial may create an additional administrative burden on certifying authorities, such a burden should be
marginal because certifying authorities are likely already developing this information as part of the
administrative record to support decisions to grant, grant with conditions, or deny certification. By
including specific information requirements for certification conditions and denials, the final rule
promotes decision-making that is transparent to the project proponent, federal agency, and the public.

4.2.2 Potential Effects of the Final Rule - Scope

The EPA expects that the scope of certification under the final rule will increase clarity and regulatory
certainty for certifying authorities and project proponents, resulting in net cost savings due to reduced
project delays, reduced litigation, and clear information requirements for certifications. For certifying
authorities that, under the baseline scenario, currently review, condition, or deny certifications using
information or criteria that are outside the final rule's scope of certification, the final rule will likely
reduce the time spent requesting out of scope information from the project proponent, reviewing out of
scope information or data, and ultimately reduce the time spent on each certification request and reduce
labor costs. In these circumstances, reduced review times may also translate into reduced wait times for
project proponents. For project proponents, the scope of certification in the final rule will likely reduce
the burden of developing and producing out of scope information and data that may be requested by
certifying authorities under baseline. The final definition of "water quality requirements" should also
eliminate non-water quality related certification conditions that may be required by the certifying
authority under baseline, potentially reducing implementation and enforcement costs to the federal
licensing and permitting agencies and reducing compliance costs for project proponents.

The final rule's requirement in section 121.7(d) to provide supporting information for each certification
condition may increase implementation and enforceability of the conditions which would lead to potential
increases in water quality protection. As described in section III.G.2.b of the final rule preamble, if the
project proponent and the federal licensing and permitting agencies understand why the condition is
necessary and the legal basis for the condition, implementation and enforcement of the condition will be
more effective and lead to greater water quality protections. Along the same lines, the final rule's
requirement in section 121.7(e) to provide supporting information for a certification denial helps maintain
transparency and provides a strong record of decision-making that may help certifying authorities defend
their decision against legal challenges.

Under the final rule, federal agencies may waive certification conditions and denials if the certifying
authority fails to include the supporting information required in sections 121.7(d) and (e) of the final rule.
Unlike the proposed rule, federal agencies are not authorized to review certification conditions and
denials to ensure they are within the scope of certification; rather this substantive review is reserved for
courts of competent jurisdiction.

By specifying that the scope of section 401 review is limited to water quality requirements, as defined in
the rule, the final rule provides additional clarity on the types of certification conditions that are
appropriate and lawful under section 401. This additional clarity should reduce confusion as compared
with the baseline scenario, and therefore reduce litigation between the project proponent and the
certifying authority about whether a certification condition or denial is within the scope of certification.
Defining the scope as limited to water quality requirements will eliminate the ability of certifying
authorities to use the certification process to condition federal licenses or permits based on air pollution,
land use, and other non-water quality impacts.

28


-------
4.3 Pre-Filing Meeting Request Requirement

4.3.1	Final Rule Provisions

To further assist with efforts to promote more complete certification requests, the EPA is finalizing a
requirement that all project proponents request a meeting with a certifying authority at least 30 days prior
to submitting a certification request. The final rule expands the application of this requirement to all
section 401 certification requests, not just those submitted when the EPA is the certifying authority as was
proposed. Under the final rule, certifying authorities are not required to accept the pre-filing meeting
request, but at a minimum, the meeting request will provide advanced notification to the certifying
authority that a certification request may be forthcoming. The final rule does not prescribe any
methodology for conducting the pre-filing meetings, but under the final rule, if the certifying authority
grants the pre-filing meeting, the project proponent and the certifying authority are encouraged to discuss
the nature of the proposed project and potential water quality effects. The final rule also encourages the
project proponent to provide a list of applicable State, Tribal, and federal licenses and permits and
describe the anticipated timeline for construction and operation. After receiving the pre-filing meeting
request, the certifying authority is encouraged to contact the federal agency and identify points of contact
at each agency to facilitate information sharing throughout the certification process.

4.3.2	Potential Effects of the Final Rule - Pre-Filing Meeting Request Requirement

Although pre-filing meetings can place additional burden on both project proponents and certifying
authorities, the process is ultimately expected to reduce burden elsewhere in the section 401 certification
process and will result in a net reduction in costs. The baseline withdrawal and resubmit process
highlights informal engagement currently occurring for larger and more complex projects. The pre-filing
meeting would provide more formal opportunity between the project proponent and the certifying
authority and shift its occurrence to earlier in the certification process, which may help project proponents
provide relevant information and certifying authorities to act within the reasonable period of time.

Some States already provide formal and informal pre-filing meetings, indicating these States believe such
meetings are beneficial. Some States recommend or require project proponents to request pre-filing
meetings (see section 4.4 of this EA). The requirement in the final rule for all project proponents to
submit a pre-filing meeting request will provide all certifying authorities with the option to learn about
and discuss proposed projects prior to receiving a certification request, which represents an improvement
from the baseline scenario. Pre-filing meetings benefit certifying authorities and project proponents by
helping everyone understand the proposed project and the type of information or data that may be
necessary for a timely and substantively complete section 401 review.

Under baseline, certifying authorities seek out early engagement with project proponents on an
inconsistent basis. The final rule requires project proponents to submit written pre-filing meeting requests
to all certifying authorities, which may place a burden on project proponents when certifying authorities
accept such meetings. In addition to the potential time burden, project proponents may be required to pay
a fee for a pre-application meeting. For example, Michigan uses a joint State and Corps permit
application, and project proponents currently have the option to request a pre-application meeting for a
fee up to $1,100 (Michigan Department of Environmental Quality, 2019). As pre-filing meetings become
more common as a result of this rulemaking, certifying authorities may consider adding pre-filing
meeting fees to help cover their administrative costs. However, the EPA does not have information on
which States may impose these fees or the magnitude of potential future-imposed fees.

The burden of the pre-filing meeting provision on certifying authorities depends on multiple factors. First,
the burden depends on how much the baseline scenario changes as a result of this final rule provision.
Some certifying authorities are already engaging in pre-filing meetings with project proponents and may

29


-------
thus experience limited to no changes as a result of this provision of the final rule. Second, the burden
depends on each certifying authority's acceptance rate for pre-filing meeting requests. To minimize costs
and burdens on staff, certifying authorities can decline all meeting requests or choose to decline meeting
requests for routine or non-complex projects and only accept the meeting for larger or complex projects.
Third, the burden depends on the methodology that certifying authorities use to conduct pre-filing
meetings. Certifying authorities can use methodologies that would limit staff time and resources, such as
conducting the meeting online or via phone call. Lastly, the burden also depends on whether a certifying
authority implements a pre-filing meeting fee to help cover costs. The EPA recognizes there is
considerable uncertainty in estimating how certifying authorities may change the baseline scenario in
response to the final rule (see Table 6-1).

4.4 Potential Effects on Federal Agencies, States, and Tribes

Federal agencies can play an important role in facilitating information collection, sharing information
amongst involved parties, and clearly communicating project milestones and deadlines during the federal
license and permitting process. The changes in this final rule highlight how federal agencies are uniquely
positioned to promote pre-filing coordination with certifying authorities and project proponents to
harmonize project planning activities and promote timely action on certification requests. The final rule
does not explicitly require federal agencies to change their existing regulations to reflect these updated
requirements. For this reason, the EA does not attempt to quantify those potential costs. However, the
Executive Order directs federal agencies to update their regulations to ensure consistency with the EPA's
final updated regulations. The final rule highlights the need for clear communication between entities and
outlines opportunities for certifying authorities and federal agencies to facilitate this communication.

Certifying authorities generally delineate their section 401 requirements in statutes, regulations, guidance
documents, and forms. Some public commenters on the proposed rule noted that States that have section
401 regulations, statutes, guidance documents, and forms that are inconsistent with this final rule may
face a range of risks. Some commenters asserted that the timeframe for certification reviews may conflict
with current State laws, such as State laws requiring time to determine collection of all necessary
information or development of environmental impact reports, public participation timeframes, and
withdrawal and resubmittal processes. One commenter stated the proposed rule would require States to
change their laws to comply with the EPA's new rule. Other commenters urged the EPA to include a
process by which States can assess the compatibility of their respective section 401 certification rules
with the EPA's final rule.

The final rule does not require States or Tribes to update their regulations, statutes, guidance documents,
or forms. Section 401 is a direct grant of authority to States and authorized Tribes to review proposed
federal licenses and permits and grant, deny or waive certification as appropriate. Unlike the section 402
and 404 permit programs, the CWA does not require EPA to approve State or Tribal administration of the
401 program. The CWA also does not require States or Tribes to establish regulations to implement
section 401, but many States and some Tribes have voluntarily promulgated section 401 implementing
regulations. Additionally, any changes made by a State or Tribe to their section 401 program do not
require formal approval by the EPA to go into effect. In summary, by finalizing this rule, EPA is neither
mandating that conforming changes be made to State or Tribal regulations, nor overseeing in any capacity
such changes. The EPA is not aware to what extent States or Tribes may update their regulations so does
not attempt to quantify potential costs associated with States or Tribes doing so. However, the Agency
recognizes that in order to increase certainty and clarity and to avoid other negative outcomes, certifying
authorities may update their section 401 requirements to conform with the final rule provisions.
Subsequent rulemakings promulgated by other federal agencies (e.g., Corps, FERC, etc.) could increase
the likelihood that certifying authorities update their section 401 requirements. Inconsistencies between

30


-------
State and federal law may lead to negative outcomes such as regulatory uncertainty, decreased project
viability, and legal risks which could increase the burden on certifying authorities and project proponents.
Because certifying authorities delineate their requirements in different ways, the EPA is unable to fully
describe all potential revisions States may make or the associated costs. The following paragraphs discuss
potential changes States may make in response to the final rule. The EPA reviewed select topics covered
in State section 401 regulations that may differ from the final rule provisions.

Some State section 401 regulations include language stating that the reasonable period of time (a
maximum one-year statutory timeframe determined by the federal agency) begins after the State receives
a complete application or after the certifying authority determines that a certification request is complete.
Some State regulations identify the components that must be included in a complete request, including
open-ended requests for all information related to potential impacts from the proposed project. The
request components required in the final rule do not cover the universe of all components from all State
programs. This is particularly true for open-ended information requests that may exceed the scope of
certification provided in the final rule. Although the final rule does not prevent States from requiring
additional information beyond what is described in the final rule, States cannot use these additional
information requirements to delay the start or the conclusion of the reasonable period of time. States with
language indicating that the maximum one-year statutory timeframe starts after they receive a complete
application or after they determine that a certification request is complete, based on components listed in
the State regulation but that are not reflected in the final rule, may update their regulations to conform
with the final rule.

Some State section 401 regulations recommend or encourage project proponents to request meetings with
the State prior to the submittal of a certification request. However, under the final rule, project proponents
(including federal agencies seeking to issue general license or permits) are required to request pre-filing
meetings for every project. While the final rule mandates that the project proponent request a pre-filing
meeting, it is essentially providing notice to the certifying authority as there is no requirement for the
certifying authority to hold the pre-filing meeting. States may update their regulations to require a pre-
filing meeting request for all projects.

States also have different fee structures for 401 certifications. Some State section 401 regulations mention
the existence of a fee but do not include specific language about the response to nonpayment of the fees.
Other States include language about nonpayment of applicable fees; for example, regulations may specify
that fees must be paid to produce a complete application and start the review process, or that an
application is considered withdrawn if the project proponent fails to pay the appropriate fee within a
specified time period. The final rule does not include payment of fees as one of the required certification
request components, nor is nonpayment of fees included as an element of a certification denial in section
121.7(e) of the final rule. The final rule does not prevent or preclude a certifying authority from requiring
fees, and the EPA encourages the project proponent and the certifying authority to discuss during the pre-
filing meeting the certifying authority's fee structure and the project proponent's obligation, if any, to pay
a fee related to the water quality certification. Given the States' differing practices in this area, the final
rule does not include proof of fee payment as a required component of a certification request to trigger the
statutory timeframe for State or Tribal action.

In accordance with the Paperwork Reduction Act, the EPA has developed a proposed ICR for the final
rule. As noted above, ICRs are developed based on available information about how a regulation may
affect a respondent. That ICR estimates that under the final rule, respondents will submit approximately 1
million certification requests per year and that annual paperwork burden is expected to be approximately
931,000 hours. ICRs are developed based on available information about how a regulation may affect a
respondent; however, the data used to support this ICR is not robust enough to rely on for the

31


-------
development of a quantitative economic analysis. To estimate the burden for this ICR, the EPA selected
the midpoint of an estimated low and high burden. The low-end burden was taken from EPA ICR
Number 0229.23, which was established for section 401 certifications for federally issued NPDES
permits and does not capture the range of certification requests prepared by project proponents and
reviewed by certifying authorities. The high-end burden was established based on information provided
by six respondents to an EPA questionnaire, which is not expected to be representative of the whole
population of certifying authorities and is not representative of the population of project proponents. The
limitations and uncertainties in this data set preclude its use for the development of a quantitative
economic analysis. The EPA estimated a reduction in burden because there are fewer information
requirements in the final rule, and because the scope of the final rule is limited to discharges rather than
the activity as a whole. The ICR burden estimates are provided in this EA for informational purposes only
and are not intended for use as quantitative conclusions about potential economic costs or benefits of the
final rule.

5 Possible Effects on Example Cases

Example cases presented in section 3 demonstrate the potential for confusion and regulatory uncertainty
under the baseline scenario. The final rule addresses this confusion and regulatory uncertainty by
clarifying the timeframe for certifying authorities to act on a certification request and the scope of
certification review, and by adding a pre-filing meeting request requirement to encourage early
communication, collaboration, and information sharing among project proponents, certifying authorities,
and, in some cases, federal licensing and permitting agencies. This section discusses how the final rule
could have affected the example cases of certification denials (section 3.1) and failure to act (section 3.2).

5.1 New York Natural Gas Pipelines

Table 5-1 summarizes how the final rule could have impacted recent denial cases for natural gas pipelines
in New York State.

Table 5-1: Possible impacts of the final section 401 revisions on recent New York State pipeline
denials

Final Revision

Constitution Pipeline

Valley Lateral Pipeline

Northern Access
Pipeline

Timeframe

Project proponent filed
section 401 certification
request on August 22,
2013. The final rule
unambiguously provides
that a decision would
have been required by
August 2014 (actually
issued April 2016).

Project proponent filed
section 401 certification
request on November 13,
2015. The final rule
unambiguously provides that
a decision would have been
required by November 2016
(actually issued August 2017).

Project proponent filed
section 401 certification
request in February 2016.
The final rule
unambiguously provides
that a decision would have
been required by February
2017 (actually issued April
2017).

Scope

NYSDEC denied section
401 certification for
failing to demonstrate
compliance with NYS
WQS, so the final rule
scope of certification is

NYSDEC denied section 401
certification because FERC's
environmental review of the
project failed to consider
downstream greenhouse gas
emissions from the electric
generator shipper. This denial

NYSDEC denied section
401 certification for failing
to demonstrate
compliance with State
WQS, so the final rule
scope of certification is

32


-------
Table 5-1: Possible impacts of the final section 401 revisions on recent New York State pipeline
denials

Final Revision

Constitution Pipeline

Valley Lateral Pipeline

Northern Access
Pipeline



unlikely to have impacted
this case.

would be subject to challenge
because it was based on
greenhouse gas emissions,
which is beyond the scope of
certification in the final rule.

However, if NYSDEC had
provided the three elements
to support a denial, the denial
would have passed federal
agency review. If NYSDEC had
not provided the three
elements of a denial, FERC
may have treated the decision
as a waiver.

unlikely to have impacted
this case.

Overall, the final rule provisions that could have resulted in the biggest outcome changes for the New
York pipeline cases are the timeframe changes. The review timeframe revision would have necessitated a
section 401 certification decision within one year of receiving the request for certification. Instead, a
decision took three years in the Constitution case, nearly two years in the Valley Lateral case, and 14
months in the Northern Access case. The pre-filing meeting request requirement of the final rule may also
have helped NYSDEC and the project proponents meet the maximum one-year reasonable period of time
by identifying potential data needs early in the process.

The Valley Lateral pipeline denial is the most likely of the three cases to have a different result under the
final rule's scope of certification. In this case, NYSDEC denied section 401 certification because of
greenhouse gas effects, which does not fall within the final scope of certification. If NYSDEC had
provided the three elements of a denial, the denial would have passed federal agency review, but the
project proponent may have challenged the denial in court as beyond the scope of CWA section 401. If
NYSDEC had not provided the three elements of a denial, FERC may have treated the decision as a
waiver.

5.2 Millennium Bulk Terminals in Washington State

Millennium first submitted a section 404 permit application to the Corps and a section 401 certification
request to the Washington Department of Ecology in February 2012 via a Joint Aquatic Resources Permit
Application (JARPA), which serves as a joint application for federal, State, and local aquatic resource
permits.29 Millennium withdrew its JARPA in February 2013 at the Corps' request to allow the federal
agency more time to complete its regulatory process,30 with the intention of resubmitting after the
environmental review process (Washington Department of Ecology, 2019). Millennium resubmitted its

29	Millennium Bulk Terminals Longview, LLC v. Washington State Department of Ecology. Docket 18-2-00994-08.
Petition for Review.

30	Millennium Bulk Terminals Longview, LLC v. Washington State Department of Ecology. Docket 18-2-00994-08.
Petition for Review.

33


-------
JARPA in July 2016. Assuming the project proponent still withdrew its JARPA and resubmitted near the
conclusion of the environmental review process under the final revisions, the Washington Department of
Ecology would have needed to issue a section 401 certification determination by July 2017 to comply
with the timeframe revision and avoid waiving review. The Washington Department of Ecology actually
issued its determination two months later in September 2017, one year after the Corps issued its EIS. If
the project proponent had never agreed to withdraw its section 401 certification request and to resubmit it
closer to the conclusion of the environmental review process, the Washington Department of Ecology
would have been required to act on the request by February 2013, the same month that the project
proponent withdrew their initial request. The pre-filing meeting request requirement of the final rule may
have helped Washington Department of Ecology and Millennium meet the maximum one-year reasonable
period of time by identifying potential data needs early in the process. Additionally, the pre-filing meeting
request requirement is an opportunity for project proponents to obtain more information about the
appropriate timing for submitting a certification request.

The Washington Department of Ecology's certification denial, dated September 2017, identified several
reasons, including that the section 401 certification request did not provide reasonable assurance that the
project would meet State WQS; the project would have unavoidable, adverse impacts to the local
environment, transportation, public health, the local community, and Tribal resources; increased cancer
risk from diesel pollution; more traffic congestion and delayed emergency response times; increased
vessel traffic on the Columbia River; and limited Tribal fishing access. In this case, the State's assertion
that the certification request did not provide reasonable assurance that the project would meet WQS
would be within the final scope of certification; the other reasons provided could have been subject to
challenges as they may be beyond the scope of certification.

5.3 West Virginia Hydropower Projects

The WV DEP received the water quality certification request from FFP for the Morgantown and
Opekiska projects on February 12, 2016. To comply with the maximum one-year reasonable period of
time and avoid waiving review, the WV DEP would have needed to issue a section 401 certification
determination by February 12, 2017. The WV DEP actually issued its determination approximately one
month later on March 8, 2017, based on the understanding that they had one year after deeming the
request complete. FERC ultimately determined that the WV DEP had waived certification. The final rule
will provide clarification regarding when the maximum one-year statutory timeframe starts, making
circumstances where a certifying authority unintentionally waives due to a failure to act less likely. The
pre-filing meeting request requirement of the final rule may have helped WV DEP meet the maximum
one-year reasonable period of time by identifying potential information needs early in the process.

6 Data Limitations and Uncertainty

Table 6-1 summarizes the limitations and uncertainties the EPA faced in assessing the potential impacts
arising from the final rule. Whether these limitations and uncertainties, taken together, are likely to result
in an understatement or overstatement of the potential impacts is not known.

Table 6-1: Limitations and uncertainties in estimating effects of final rule

Uncertainty/Data Limitation

Notes

Lack of national-level dataset of
section 401 certification reviews

The lack of a national-level dataset of section 401 water quality certification
reviews limited the EPA's ability to perform a quantitative analysis of the
potential impacts of the final rule in the EA. The EPA has limited data

34


-------
Table 6-1: Limitations and uncertainties in estimating effects of final rule

Uncertainty/Data Limitation

Notes



regarding the number of section 401 reviews that each certifying authority
conducts annually, the number of certification actions (grant, grant with
conditions, deny, or waive), average time spent per review, and other time
requirements.

Lack of information to determine
how certifying authorities will
respond to the final rule (e.g., fee
changes, acceptance rate of pre-
filing meeting request
requirement)

The impact of the final rule on both certifying authorities and project
proponents can vary depending on certifying authority response. Certifying
authorities may adjust their fee structure for section 401 reviews to
account for changing costs or keep their fee structure (or lack thereof) the
same. The impact of the pre-filing meeting request requirement depends
on whether the certifying authority currently engages in pre-filing
meetings, how frequently the certifying authority may accept the meeting
request, the methodology used to conduct pre-filing meetings, and
whether the certifying authority implements a pre-filing meeting fee to
help cover costs.

Lack of information to determine
how many requests are
submitted without enough
information to make a water
quality certification
determination

The final rule clarifies that the section 401 review timeframe starts after
receipt of a certification request rather than after the certifying authority
deems a request complete. Quantifying the impacts of this provision would
require data about the proportion of requests that are incomplete under
baseline, the proportion of requests that may be incomplete under the final
rule, and would require communication with the project proponent and
certifying authorities to receive additional information.

Lack of information to determine
change in certification denials

With the review timeframe starting after receipt of a certification request,
certifying authorities may deny certification if they do not receive
additional information they assert is needed to make a determination,
particularly for licenses/permits with shorter reasonable periods of time
(e.g., section 402, section 404). The elimination of the withdraw-and-
resubmit practice may also increase the number of certification denials, but
the actual change is uncertain since pre-filing meetings will likely increase
the initial availability of information that may be necessary to make a
certification decision.

7 References

Arizona Department of Environmental Quality. (2018). Why do I need a State Water Quality

Certification, CWA Section 401? Retrieved from Arizona Department of Environmental Quality:
https://azdeq.gov/why-do-i-need-state-water-quality-certification-cwa-section-401
Association of Clean Water Administrators (ACWA). (2019). 401 Certification Survey Summary.

Retrieved from: https://www.acwa-us.org/wp-content/uploads/2019/05/ACWA-State-401-Cert-
Survey-Summary.pdf

Association of State Wetland Managers (ASWM). (201 la). 401 Certification Program Summary:

Wisconsin. Retrieved from https://www.aswm.org/pdf_lib/401_cert/wisconsin_case_study.pdf
Association of State Wetland Managers (ASWM). (201 lb). 401 Certification Program Summary:

Delaware. Retrieved from https://www.aswm.org/pdf_lib/401_cert/delaware_case_study.pdf
California Water Boards. (2018). Water Quality Certification. Retrieved from California Water Boards:
https://www.waterboards.ca.gov/sanfranciscobay/certs.htm

35


-------
Colorado Environmental Records, (n.d.). State of Colorado Water Quality Certification. Retrieved from:

https://environmentalrecords.colorado.gov/HPRMWebDrawer/RecordView/1213810
Cowlitz County and Washington Department of Ecology (2017). State Environmental Policy Act Final
Environmental Impact Statement, Volume I: Final Environmental Impact Statement. Retrieved
from: http://millenniumbulkeiswa.gov/assets/mbtl_sepa_final-eis_volume_i_04252017_web
_sm.pdf

Federal Energy Regulatory Commission (FERC). (2016). Multi-project Environmental Assessment for
Hydropower License. 20160930-3010. Retrieved from

https://www.ferc.gov/industries/hydropower/enviro/eis/2016/P-13753-002-EA.pdf
Federal Energy Regulatory Commission (FERC). (2018). Federal Energy Regulatory Commission.

Retrieved from What FERC Does: https://www.ferc.gov/about/ferc-does.asp
Federal Energy Regulatory Commission (FERC). (2019a). Complete List of Active Hydropower

Licenses. Retrived from: https://www.ferc.gov/industries/hydropower/gen-info/licensing/app-
new.asp

Federal Energy Regulatory Commission (FERC). (2019b). Approved Major Pipeline Projects (2009-
Present). Retrieved from: https://www.ferc.gov/industries/gas/indus-act/pipelines/approved-
projects.asp

Ferguson, B. (2018). Letter to Lieutenant General Todd T. Semonite Re: Millennium Bulk Terminals-
Longview Proposed Coal Export Terminal. November 21. Retrieved from
https://ecology.wa.gov/DOE/files/cf/cf06ca42-e617-4ccb-9edb-41eaf4ecb6cd.pdf
Michigan Department of Environmental Quality. (2019). Joint Permit Application Fees. Retrieved from
Michigan Department of Environmental Quality:

https://www.michigan.gov/documents/deq/DEQ-WRD-JPA-Fee-Schedule_649326_7.pdf
North Carolina Department of Environmental Quality, (n.d.). General Certifications. Retrieved from

North Carolina Environmental Quality: https://deq.nc.gov/about/divisions/water-resources/water-
quality-permitting/401 -wetlands-buffer-permitting/general
U.S. Army Corps of Engineers (USACE). (2016). Millennium Bulk Terminals—Longview: Draft NEPA
Environmental Impact Statement. Retrieved from:

https://www.millenniumbulkeiswa.gov/assets/01_executive_summary.pdf
U.S. Army Corps of Engineers (USACE). (2017). Army Corps of Engineers Releases 2017 Nationwide
Permits. January 19. Retrieved from https://www.vnf.com/army-corps-of-engineers-releases-
2017 -nationwide-permits

U.S. Army Corps of Engineers (USACE). (2019). Regulatory Guidance Letter: Timeframes for Clean
Water Act Section 401 Water Quality Certifications and Clarification of Waiver Responsibility.
No. 19-02. August 7. Retrieved from

https://usace.contentdm.oclc.org/utils/getfile/collection/pl6021coll9/id/1548
U.S. Army Corps of Engineers (USACE). (n.d.-a). Obtain a Permit. Retrieved from U.S. Army Corps of
Engineers: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-
Permits/Obtain-a-Permit/

36


-------
U.S. Army Corps of Engineers (USACE). (n.d.-b). Rivers and Harbors Act. Retrieved from US Army
Corps of Engineers, Sacramento District:

https://www.spk.usace.army.mil/Missions/Regulatory/Jurisdiction/Rivers-Harbors-Act/
U.S. Energy Information Administration. (2020a). Nuclear Explained: Nuclear Power and the
Environment. Retrieved from U.S. Energy Information Administration:
https://www.eia.gov/energyexplained/nuclear/nuclear-power-and-the-environment.php
U.S. Energy Information Administration. (2020b). Nuclear Explained: U.S. Nuclear Industry. Retrieved
from U.S. Energy Information Administration:
https://www.eia.gov/energyexplained/index.php?page=nuclear_use
U.S. Environmental Protection Agency (U.S. EPA). (2001). EPA Requirements for Quality Assurance
Project Plans. Retrieved from U.S. Environmental Protection Agency:
https://www.epa.gov/sites/production/files/2016-06/documents/r5-final_0.pdf
U.S. Environmental Protection Agency (U.S. EPA). (2015). NPDES Program Authorizations. Retrieved
from U.S. Environmental Protection Agency: https://www.epa.gov/sites/production/files/2015-
10/documents/state_npdes_program_status.pdf
U.S. Environmental Protection Agency (U.S. EPA). (2017). Authorization Status for EPA's Construction
and Industrial Stormwater Programs. Retrieved from https://www.epa.gov/npdes/authorization-
status-epas-construction-and-industrial-stormwater-programs#undefined
U.S. Environmental Protection Agency (U.S. EPA). (2019a). Clean Water Act Section 401 Guidance for
Federal Agencies, States and Authorized Tribes. Retrieved from U.S. Environmental Protection
Agency: https://www.epa.gov/sites/production/files/2019-
06/documcnts/c\\a_scction_40 l_guidancc.pdf
U.S. Environmental Protection Agency (U.S. EPA). (2019b). NPDES State Program Information.

Retrieved from U.S. Environmental Protection Agency: https://www.epa.gov/npdes/npdes-state-
program-information

U.S. Government Accountability Office (GAO). (2016). Hardrock Mining: BLM and Forest Service Have
Taken Some Actions to Expedite the Mine Plan Review Process but Could Do More. Retrieved
from: https://www.gao.gov/assets/680/674752.pdf
U.S. Nuclear Regulatory Commission (NRC). (2018). U.S. Commercial Nuclear Power Reactors -

Operating Reactors. Retrieved from: https://www.nrc.gov/reading-rm/doc-collections/datasets/
Washington Department of Ecology. (2019). Millennium Bulk Terminals Longview. Retrieved from
https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental-review/SEPA-at-
Ecology/Millennium

Weiler, S.A. and M.A. Stanford. (2018). New York's Denial of Water Quality Certification for Three

FERC-Authorized Pipelines: Flagrant Fiat or Valid Veto? Energy Law Journal, 503-530.

Western States Water Council. (2014). Summary of State Responses: Clean Water Act Section 401 Water
Quality Certification Activities.

37


-------
Appendix A. Tables/Figures for Federal License/Permit
Overview

Figure A-l. NPDES program authorizations as of July 2015.

U.S. Territories
I 1 American Samoa
I I Guam
I I Johnston Atoll
I I Midway/Wake Islands
I I Northern Mariana Islands
1 I Puerto Rico
Virgin Islands

State NPDES Program Status

I I Fully authorized

I I Fully authorized, including an approved biosolids program

Partially authorized
I 1 Unauthorized

Source: U.S. EPA, 2015

Note: The EPA is currently delegating NPDES authority to Idaho. Idaho is projected to be fully authorized by July
1, 2021.

Table A-l: State websites with public documentation of licenses/permits and section 401
certification documents

State

Website title

Link

Arkansas

Instream 401
Certification and Short
Term Activity
Authorization

https://www.adeq.state.ar.us/water/planning/instream/

California (San
Diego Region)

San Diego Region -
Wetlands and Riparian
Protection

https://www.waterboards.ca.gov/rwqcb9/water_issues/program
s/401_certification/

California (San
Francisco Bay)

Clean Water Act Section
401 Water Quality
Certification

https://www.waterboards.ca.gov/sanfranciscobay/certs.html

Maine

Hydropower and Dams

https://www.maine.gOv/dep/land/dams-hydro/index.html#state

Mississippi

Recently Issued Permits
and Certifications

https://www.mdeq.ms.gov/ensearch/recently-issued-permits-
certifi cations/

New Hampshire

Projects Requiring
Individual 401
Certification for Federal
Licenses or Permits
(other than FERC)

https://www.des.nh.gov/organization/divisions/water/wmb/secti
on4Ql/coe_ind.htm

38


-------
Table A-l: State websites with public documentation of licenses/permits and section 401
certification documents

State

Website title

Link

North Carolina

Environmental Request
Tracker

https://deq.nc.gov/perm its-regulations/permit-
guidance/environmental-request-tracker

Oregon

Section 401 Hydropower
Certification

https://www.oregon.gov/deq/wq/wqpermits/Pages/Section-401-
Hydropower.aspx

Texas

401 Certification
Tracking System

https://www6.tceq.texas.gov/cmpts/index.cfm

Washington

401 Water Quality
Certifications for non-
hydropower permits

https://ecology.wa.gov/Regulations-Permits/Permits-
certifications/401-Water-quality-certification/non-hydropower-
401-certifi cations

39


-------