0 Baiteiie

. . . Putting Technology To Work

Environmental Technology
Verification Program

Advanced Monitoring
Systems Center

Test/QA Plan for
Verification of Continuous
Emission Monitors for
Ammonia at a Coal-Fired
Facility

ET^ET^EIV


-------
TEST/QA PLAN

FOR

VERIFICATION OF CONTINUOUS
EMISSION MONITORS FOR AMMONIA
AT A COAL-FIRED FACILITY

June 2003

Prepared by

Battelle

505 King Avenue
Columbus, OH 43201-2693


-------
TABLE OF CONTENTS

Page

1.0 INTRODUCTION 	1

1.1	Test Description 	 1

1.2	Test Objective 	 1

1.3	Organization and Responsibilities 	 2

2.0 VERIFICATION APPROACH 	10

2.1	Introduction	 10

2.2	Scope 	10

3 .0 SITE DESCRIPTION 	12

4.0 EXPERIMENTAL DESIGN 	12

4.1	General Design 	12

4.2	Test Conditions 	14

4.3	Test Procedures 	15

4.4	Data Comparisons 	19

5.0 STATISTICAL CALCULATIONS 	 22

5.1	Relative Accuracy 	22

5.2	Comparability 	23

5.3	Linearity 	23

5.4	Precision	23

5.5	Calibration and Zero Drift	24

5.6	Response Time	24

6.0 MATERIALS AND EQUIPMENT 	25

6.1	Gases and Chemicals 	 25

6.2	Reference Method 	 25

6.3	Facility Monitoring Equipment 	26

6.4	Equipment Used for Performance Evaluation Audits	26


-------
TABLE OF CONTENTS (Continued)

Page

7.0 QUALITY ASSURANCE/QUALITY CONTROL 	 28

7.1	Equipment Calibrations 	 28

7.2	QA/QC Samples	30

7.3	Assessment and Audits 	 31

8.0 DATA ANALYSIS AND REPORTING 	 35

8.1	Data Acquisition 	 35

8.2	Data Review 	 36

8.3	Reporting 	 36

9.0 HEALTH AND SAFETY 	 38

10.0 REFERENCES 	 39

Tables

Table 4-1. Summary of Flue Gas Parameters or Constituent Concentrations

Typically Observed at the Host Facility 	14

Table 4-2. Summary of Data to be Obtained in Ammonia CEM Verification Test	20

Table 7-1. Summary of PE Audits 	32

Table 8-1. Summary of Data Recording Process 	37

Figures

Figure 1-1. Organization Chart for the Ammonia CEM Verification Test 	3


-------
ETV Advanced Monitoring Systems Center

Test/QA Plan for Verification of Continuous Emission
Monitors for Ammonia at a Coal-Fired Facility

Version 1.0

June 25, 2003

APPROVAL:

Name	

Company	

Date


-------
DISTRIBUTION LIST

Mr. Robert Fuerst

U.S. Environmental Protection Agency-HEADS
National Exposure Research Laboratory
D-205-05 EPA Mailroom
Research Triangle Park, NC 27711

Ms. Elizabeth A. Betz

U.S. Environmental Protection Agency-HEADS
National Exposure Research Laboratory
E-205-01 EPA Mailroom
Research Triangle Park, NC 27711

Mr. James Fletcher
American Electric Power Company
1 Riverside Plaza
Columbus, Ohio 43215-2373

Mr. Charles Dene
EPRI

3412 Hillview Avenue
Palo Alto, CA 93404-1395

Mr. Jan Grimbrandt
Siemens Laser Analytics
Box 5065, SE-402 22
Gooteborg, Sweden

Mr. Paul Stenberg
Opsis, Inc.

1165 Lindavista Drive
Suite 112

San Marcos, CA 92069

Karen Riggs
Amy Dindal
Ken Cowen
Zachary Willenberg
Battelle

505 King Avenue
Columbus, OH 43201


-------
Page 1 of 39
Version 1.0
Date: 6/25/03

1.0 INTRODUCTION
1.1 Test Description

This test/quality assurance (QA) plan provides procedures for a verification test of
continuous emission monitors (CEMs) used to measure gaseous ammonia in source emissions.
The verification test will be conducted under the auspices of the U.S. Environmental Protection
Agency's (EPA) Environmental Technology Verification (ETV) program. The purpose of ETV
is to provide objective and quality assured performance data on environmental technologies, so
that users, developers, regulators, and consultants have an independent and credible assessment
of what they are buying and permitting.

The verification test will be performed by Battelle, of Columbus, OH, which is EPA's
partner for the ETV Advanced Monitoring Systems (AMS) Center. The scope of the AMS
Center covers verification of monitoring methods for contaminants and natural species in air,
water, and soil. In performing the verification test, Battelle will follow procedures specified in
this test/QA plan, and will comply with quality requirements in the "Quality Management Plan
for the ETV Advanced Monitoring Systems Center" (QMP).(1)

1.2 Test Objective

The objective of the verification test is to verify the performance of commercial ammonia
CEMs, by comparison to reference ammonia measurements, and by challenges with ammonia
standard gases, under normal operating conditions in a full-scale coal-fired power plant utilizing
a Selective Catalytic Reduction (SCR) NOx control technology.


-------
Page 2 of 39
Version 1.0
Date: 6/25/03

1.3 Organization and Responsibilities

The verification test will be performed by Battelle in cooperation with EPA, the vendors
who will be having their CEMs verified, American Electric Power (AEP), and the Electric Power
Research Institute (EPRI). The organization chart in Figure 1-1 shows the individuals from
Battelle, the vendor companies, EPA, AEP, and EPRI who will have responsibilities in the
verification test. The specific responsibilities of these individuals and organizations are detailed
in the following paragraphs.

1.3.1 Battelle

Dr. Kenneth Cowen is the AMS Center's Verification Test Coordinator for this test. In
this role, Dr. Cowen will have overall responsibility for ensuring that the technical, schedule,
and cost goals established for the verification test are met. More specifically, Dr. Cowen will:

Coordinate Battelle, contractor, host site, EPRI, and vendor staff to conduct the
verification test

Guide the Battelle/contractor/vendor team in performing the verification test in
accordance with this test/QA plan

Have overall responsibility for ensuring that this test/QA plan is followed
Prepare the draft test/QA plan, verification reports, and verification statements
Revise the draft test/QA plan, verification reports, and verification statements in
response to reviewers' comments

Respond to any issues raised in assessment reports and audits, including

instituting corrective action as necessary

Serve as the primary point of contact for vendor representatives

Coordinate distribution of final test/QA plan, verification reports, and statements


-------
Page 3 of 39
Version 1.0
Date: 6/25/03

Figure 1-1. Organizational Chart of Ammonia CEM Verification Test


-------
Page 4 of 39
Version 1.0
Date: 6/25/03

Establish a budget for the verification test and monitor the effort to ensure that
budget is not exceeded

Ensure that confidentiality of vendor information is maintained.

Ms. Amy Dindal is a Verification Testing Leader for the AMS Center. As such, Ms.
Dindal will provide technical guidance and oversee the various stages of verification testing.
She will:

Support Dr. Cowen in preparing the test/QA plan and organizing the testing

Review the draft test/QA plan

Review the draft verification reports and statements.

Ms. Karen Riggs is Battelle's AMS Center manager. As such, Ms. Riggs will:

Review the draft test/QA plan

Review the draft verification reports and statements

Ensure that necessary Battelle resources, including staff and facilities, are

committed to the verification test

Ensure that vendor confidentiality is maintained

Support Dr. Cowen in responding to any issues raised in assessment reports and
audits

Maintain communication with EPA's technical and quality managers
Facilitate a stop work order if Battelle or EPA QA staff discovers adverse
findings.

Mr. Zacharv Willenberg is Battelle's Quality Manager for the AMS Center. As such, Mr.
Willenberg will:

Review the draft test/QA plan


-------
Page 5 of 39
Version 1.0
Date: 6/25/03

Conduct quality review of procedures/documentation provided by the
sampling/analysis contractor

Conduct a technical systems audit once during the verification test

Review results of performance evaluation audit(s) specified in this test/QA plan

Audit at least 10% of the verification data

Prepare and distribute an assessment report for each audit

Verify implementation of any necessary corrective action

Issue a stop work order if internal audits indicate that data quality is being

compromised; notify Battelle's AMS Center Manager if such an order is issued

Provide a summary of the QA/QC activities and results for the verification reports

Review the draft verification reports and statements

Ensure that all quality procedures specified in this test/QA plan and in the QMP(1)
are followed.

Battelle testing staff will support Dr. Cowen in planning and conducting the verification
test. These staff will:

Assist in planning for the test, and making arrangements for the installation of the
CEMs

Assist vendors and test facility staff as needed during the CEM installation and
verification testing

Assure that test procedures and data acquisition are conducted according to this
test/QA plan

Contribute to the planning of statistical treatment of the CEMs data as needed
Perform statistical calculations specified in this test/QA plan on the analyzer data
as needed

Provide results of statistical calculations and associated discussion for the
verification reports as needed

Support Dr. Cowen in responding to any issues raised in assessment reports and


-------
Page 6 of 39
Version 1.0
Date: 6/25/03

audits related to statistics and data reduction as needed.

1.3.2	Vendors

Vendor representatives will:

Review the draft test/QA plan
Approve the final test/QA plan

Provide an ammonia CEM for the duration of the verification test
Commit or train a technical person to operate, maintain, and repair the CEM
throughout the verification test

Participate in verification testing, including providing data acquisition for their
CEMs

Provide to Battelle staff the data from their CEM at the conclusion of each test
day

Review their respective draft verification report and verification statement.

1.3.3	EPA

EPA's responsibilities in the AMS Center are based on the requirements stated in the
"Environmental Technology Verification Program Quality Management Plan" (ETV QMP).(2)
The roles of specific EPA staff under the ETV QMP are as follows:

Ms. Elizabeth Betz is EPA's AMS Quality Manager. For the verification test, Ms. Betz

will:

Review the draft test/QA plan

Perform, at her option, one external technical systems audit during the
verification test


-------
Page 7 of 39
Version 1.0
Date: 6/25/03

Notify the Battelle AMS Center Manager to facilitate a stop work order if an

external audit indicates that data quality is being compromised

Prepare and distribute an assessment report summarizing the results of the

external audit, if one is performed

Review the draft verification reports and statements.

Mr. Robert Fuerst is EPA's AMS Center Manager. As such, Mr. Fuerst will:

Review the draft test/QA plan
Approve the final test/QA plan

Notify the Battelle AMS Center Manager to facilitate a stop work order if the

external audit indicates that data quality is being compromised

Review the draft verification reports and statements

Oversee the EPA review process on the verification reports and statements

Coordinate the submission of verification reports and statements for final EPA

approval.

1.3.4 Host Facility

This verification test will be conducted in collaboration with American Electric Power,
who will provide a host facility for the test. The responsibilities of AEP and its on-site
contractor are:

Coordinate the operation of the host facility for the purposes of ETV testing
Coordinate the installation of vendors' equipment at the host facility
Communicate needs for safety and other training of staff working at the host
facility

Contribute to the development of the draft test/QA plan
Review the draft test/QA plan


-------
Page 8 of 39
Version 1.0
Date: 6/25/03

Provide on-site staff to assist during testing

Provide calibrated facility monitoring equipment (Sections 6.3 and 7.11)

Provide data on facility operations during testing, for the verification reports
Provide input in responding to any issues raised in assessment reports and audits
related to facility operations
Review draft verification reports and statements

1.3.5 Reference Sampling/Analysis Subcontractor(s)

Reference method sampling for ammonia will be conducted by one or more
subcontractors to Battelle. Analysis of the collected samples will be conducted by Battelle or
one or more subcontractors to Battelle. Such subcontractors may include organizations
responsible for operation of the host facility. The responsibilities of such subcontractors are:

Review the draft test/QA plan

Adhere to the quality requirements in this test/QA plan

Assemble trained technical staff to conduct reference method sampling for the

verification test

Oversee and conduct laboratory analysis of the reference method samples as
appropriate

Report reference method analytical and quality assurance results to Battelle in an
agreed-upon format

Support Dr. Cowen in responding to any issues raised in assessment reports and
audits related to reference method sampling and analysis.


-------
1.3.6 EPRI

Page 9 of 39
Version 1.0
Date: 6/25/03

EPRI is providing co-funding for this verification test. EPRI's activities will also
include:

Review the draft test/QA plan

Provide input on the schedule and procedures for reference method sampling and
analysis

Review the reference method data

Review the draft verification reports and statements.


-------
Page 10 of 39
Version 1.0
Date: 6/25/03

2.0 VERIFICATION APPROACH
2.1 Introduction

This test/QA plan is applicable to the verification testing of commercial CEMs for
determining gaseous ammonia in combustion source emissions. This plan is specific for
measurement of ammonia from a full-scale coal-fired power plant employing SCR NOx control
technology.

The CEMs to be tested in this verification test are based on various technologies
including tunable diode lasers and differential chemiluminescence NOx measurement. These
technologies can be employed either in an extractive mode to remove flue gas from the duct,
with a flow-through insertion probe to measure a small sample volume in-situ, or in a cross-stack
mode to measure average concentrations across the width of the duct.

2.2 Scope

The overall objective of the verification test described in this plan is to provide
quantitative verification of the performance of the ammonia CEMs in realistic test conditions.
This verification test evaluates the performance of new CEMs, installed in an operational full-
scale facility, over a relatively short test period, in the hands of vendor staff skilled in their
operation, or on-site support staff who have been trained by the vendors.

The performance parameters that are addressed by this test/QA plan include:

Accuracy
Comparability

•	Linearity

•	Precision
Calibration drift

•	Zero drift


-------
Page 11 of 39
Version 1.0
Date: 6/25/03

Response time
Ease of use
Completeness

Accuracy will be assessed for the CEMs being verified by determining the degree of
agreement with known concentrations of compressed ammonia gas standards. Comparability
will be assessed through the degree of agreement with a reference method. Precision will be
assessed in terms of the repeatability of the ammonia measurements under stable test conditions.
Calibration drift, zero drift, linearity, and response time will be assessed using commercial
compressed gas standards of ammonia.

This verification test will be conducted concurrently for all CEMs being verified, and
will occur over a period of approximately five weeks. The performance of the CEMs over that
period will be assessed and reported. It is beyond the scope of this verification test to simulate
the aging and exposures that may affect a CEM during routine long-term use. It must be noted
that long-term performance may be different from that observed in the testing described here.
However, the effort spent in installing and maintaining each CEM will be documented and used
to assess ease of use. The amount of time each CEM is operational and maintenance activities
performed over the verification test period will be recorded and reported, to help assess data
completeness.


-------
Page 12 of 39
Version 1.0
Date: 6/25/03

3.0 SITE DESCRIPTION

This verification test will be conducted at AEP's Mountaineer Plant which is a coal-fired
power plant located in New Haven, West Virginia. The CEMs to be tested will be installed at
the exit of the air SCR and upstream of the air heater. At the testing location the duct
dimensions are approximately 20 feet by 40 feet. Access to the flue gas for the CEMs and for
wet chemical reference sampling will be available through ports in the duct at the testing
location. Appropriate ports will be available for those CEMs requiring cross-duct access. The
ammonia concentration in the duct will be mapped either prior to or after testing to assess the
degree of stratification. Adjustments to the measured concentrations will be made based on the
results of this mapping. During the test period, the boiler and SCR are scheduled to operate
continuously.

4.0 EXPERIMENTAL DESIGN
4.1 General Design

The verification test described in this test/QA plan will be conducted over a period of
approximately five weeks. A window of approximately two weeks prior to testing will be
available for installing the commercial CEMs at the facility, and conducting a shakedown run of
all the CEMs before the verification test begins.

The installation/shakedown period is scheduled for approximately June 30 - July 11,
2003. The five weeks of testing will follow immediately after the setup/shakedown period.
Testing will not begin until all of the reference method equipment is ready and the facilities are
operating normally. Similarly, it is desirable that all the commercial CEMs be fully operational
to participate in the verification test. However, to avoid delaying the start of the testing, it will
be required that all participating CEMs arrive at the facility, and be ready to begin testing on
July 14, or when the facility itself is fully ready, whichever is later. CEMs which are not


-------
Page 13 of 39
Version 1.0
Date: 6/25/03

operational at that time may join the testing process if they come on-line before the fifth day of
testing.

The ammonia CEM testing will involve continuous monitoring of ammonia by the CEMs
over the entire test period with reference method sampling conducted on each weekday during
the first and fifth weeks of the test period. On each day of reference method sampling, duplicate
reference method samples will be collected over each of three different sampling periods. The
average CEM readings during these periods will be used for comparisons with the ammonia
concentrations measured from the reference method samples. During each day of reference
method sampling, a zero and span check will be conducted on the CEMs by challenging each
with zero air and an ammonia gas standard. These zero/span checks will be used to assess drift
of the CEMs during the test period.

During the third week of testing, each of the CEMs will independently be challenged
with a series of runs involving dynamic spiking of compressed ammonia gas standards. The
results of these runs will be used to assess accuracy of the CEMs as well as the linearity in
instrument response.

Throughout the verification test, each CEM undergoing testing will be operated by the
CEM vendor's own staff or by on-site staff trained by the vendor. However, the intent of the
testing is for the CEM to operate continuously in a manner simulating operation at a combustion
facility. As a result, once the verification test has begun, no adjustment or recalibration
will be performed, other than what would be conducted automatically by the CEM in
normal unattended operation. Repair or maintenance procedures may be carried out at any
time, but testing will not be interrupted, and data completeness will be reduced if such activities
prevent collection of CEM data required for verification.

The procedures of this verification test are described in more detail in the subsequent
sections.


-------
Page 14 of 39
Version 1.0
Date: 6/25/03

4.2 Test Conditions

Table 4-1 shows the approximate levels of ammonia and other constituents that are
typical of the flue gas stream at the host facility. Actual concentrations of these parameters and
gaseous constituents during the testing period will be measured by the host facility's routine
monitoring systems, or by the subcontractor conducting the reference method sampling. In all
cases when reference method sampling is being conducted, the fuel loading and ammonia
injection rate will be held as constant as possible throughout the entire sampling period (e.g.,
fuel loading rate within ± 10%, and ammonia injection rate within ± 10%). The intent of this
approach is to allow comparisons of CEM data to reference method data under constant
conditions. It is expected that during normal operation, the ammonia concentrations in the flue
gas will be at or below 2 ppmv, and during dynamic spiking the range of concentrations will be
changed to be between approximately 0 and 10 ppmv.

Table 4-1. Summary of Flue Gas Parameters or Constituent
Concentrations Typically Observed at the Host Facility

Parameter/Constituent

Typical Cone, or Range

nh3

1-2 ppmv

NOx

37 ppmv

S02

540 ppmv

02

-3.8%

Dust loading

4.3 grains/dscf

H20

-8%

C02

-15%

Temperature

Typically 600-650 up to 750 F


-------
Page 15 of 39
Version 1.0
Date: 6/25/03

4.3 Test Procedures

The CEMs undergoing verification will be installed between the exit of the SCR and the
inlet of the air heaters. Ports for the reference method sampling will be located on the same duct
with the CEMs as close as possible to the sampling locations of the CEMs. The sampling ports
will be assigned so that no CEM is affected by the operation of any other CEM or by the
reference method sampling. In-situ CEMs should be installed with either an in-line gas cell, or
an external gas cell that can be used for calibration and dynamic spiking purposes. Likewise the
extractive systems should be installed with a means of spiking compressed gas into the sampling
probe upstream of the in-line filter.

At either the beginning or the end of each test day during the first and fifth weeks of
testing, the CEMs undergoing testing will be supplied (one at a time) with zero gas and then with
a commercial compressed gas standard containing ammonia. The order in which the CEMs are
to be tested will be varied, as will the time of day during which the CEMs are challenged. After
reaching equilibrium, the response to each gas will be recorded for use in assessing the zero and
calibration drift of the CEMs.

During the second and fourth weeks of the test, the CEMs will continue to operate
continuously, though no zero/span checks or reference sampling will take place.

4.3.1 Reference Method

During testing, wet chemical reference samples will be collected during the first and fifth
weeks. Verification will include comparisons of the CEM results with those from a time-
integrated EPA Conditional Test Method for measurement of ammonia in flue gas (CTM027)(4).
The conditional test method is similar to a draft ASTM method(5) for measurement of ammonia,
which is designed specifically for the measurement of low levels of ammonia, typical of slip
concentrations from SCR applications. There are however some notable differences between the
two methods. The primary difference between the two methods involves the sample analysis
rather than the sample collection. The draft ASTM method(5) calls for analysis by ion selective


-------
Page 16 of 39
Version 1.0
Date: 6/25/03

electrode (ISE) whereas the EPA method(4) calls for analysis by ion chromatography (IC). Other
differences between the draft ASTM method and the EPA CTM027 include different
concentrations and volumes of the H2S04 solution in impingers 1 and 2 of the sampling train.
The draft ASTM method calls for a smaller volume of a more dilute acid solution. This is more
appropriate than the levels recommended in the EPA CTM027 method for the measurement of
low levels of ammonia, so the ASTM levels will be used in the EPA CTM027 method for this
verification test.

During verification testing, reference sampling will be conducted simultaneously with
two trains co-located with the CEMs being tested. The sampling duration for each run will
typically be between 30 and 60 minutes. Thus each of the three reference sampling periods
during a test day will provide two reference ammonia samples for comparison to the CEM data.
Unique sample identification numbers will be implemented so that final data used for
verification can be traced back through the analytical process to the original sample. Field blank
samples will also be recovered from one blank sampling train on each of three days during each
week that reference method samples are collected. Before sample recovery, that blank train will
be transported to the sampling location. Care will be taken that the blank train is selected at
random from the prepared trains, so that different trains are used as the blank on different days.
Additionally, on each of three days during each week of reference sampling, one sample train
will be spiked with ammonia solution to serve as a field spike sample.

Samples will be recovered from the reference method trains within two hours of sample
collection, and each of the reference samples will be split into two portions with one portion
analyzed on-site by the draft ASTM method(5) using an ISE (e.g., Thermo-Orion NH3/NH4+ gas
sensing electrode, or similar), and the second portion analyzed in the laboratory by the EPA
CTM027(4) using an IC (e.g., Dionex Model 2120, or similar). The ISE analysis will be
conducted within two hours of sample recovery by Battelle or subcontractor staff, using
available on-site facilities. The front and back impingers will be analyzed separately on-site by
ISE. If no breakthrough has occurred, the solutions will be combined for IC analysis. The
results of the on-site by ISE will not be used for verification of the CEMS. Rather they will be
used to assess the ammonia levels being sampled and to ensure that the reference sampling is


-------
Page 17 of 39
Version 1.0
Date: 6/25/03

being performed properly. Samples for IC analysis will be stored at 4°C ± 2°C (not frozen) until
shipment to the analytical laboratory and will be shipped on blue ice to the analytical laboratory
within one week of sample collection. After receipt at the laboratory, the samples will be stored
at 4°C ± 2°C until analysis, and will be analyzed within two weeks of receipt. Just prior to IC
analysis the samples will be removed from refrigerated storage and allowed to slowly warm to
room temperature.

At the ammonia concentrations to be used in this verification, it is expected from
previous results6 that the precision of duplicate reference method results will be within about 35
percent relative percent difference. It is expected that day-to-day reproducibility of ammonia
levels in the facility will also be within that range. Thus, during normal operation it is expected
that the ammonia levels will be consistent to ± 35% throughout each week of testing. As a
result, the entire set of reference method results, not merely those from a single test day, will be
considered in screening for reference data quality. The reference method results will be
reviewed before verification comparisons are made, to identify individual statistical outliers from
the full set of reference method results. That is, the reference method results will be screened for
two factors:

•	Precision of results from co-located sampling trains

•	Consistency of results with previous and later results at the respective sampling
location

Identification of outliers will be based on basic statistical tests such as a t-test comparison
of means, or a Q-test evaluation of divergent results. In any case where rejection of a reference
result is suggested, effort will be made to find an assignable cause for the divergent result.
Reference method results which are identified as statistical outliers on any of these criteria will
be reported, but will not be used for verification. The intent of this approach is to provide a valid
set of reference data for verification purposes, while also illustrating the degree of variability of
the reference methods.


-------
Page 18 of 39
Version 1.0
Date: 6/25/03

4.3.2 Dynamic Spiking

During the third week of testing, each of the CEMs will be challenged with a series of
dynamic spiking runs. During these runs the ammonia concentrations will be increased by
approximately 2, 5, and 8 ppmv above the flue gas concentration. At each spike concentration, a
series of runs will be conducted including 12 spiked and 12 unspiked sample measurements.
These measurements will be performed by sampling pairs of spiked samples, followed by
sampling pairs of unspiked samples. Prior to measurement, each CEM will be readied by
purging the gas cell (for in-situ analyzers) with at least 10 volumes of zero air or by purging the
sampling probe (for extractive CEMs) with at least 10 volumes of sample gas. After this purging
is completed, a standard ammonia gas mixture will be introduced, at a measured flow rate, to the
gas cell (for in-situ analyzers), or to the sampling probe (for extractive CEMs). The CEM
readings of the spiked sample will be recorded after at least 10 volumes of gas have passed
through the gas cell or sampling probe. A second spiked sample will be measured after at least
five volumes of gas have passed through the sample cell or sampling probe after the
measurement of the first spiked sample. After the second spiked sample is measured, a pair of
unspiked samples will be measured following the same procedure as the spiked samples with the
exception that zero air will be substituted for the ammonia spike gas. The procedures for the
collection of the spiked and unspiked samples will be conducted a total of six times at each of
the spike concentrations to obtain 12 spiked and 12 unspiked samples at each concentration.

For the in-situ CEMs, these dynamic spiking runs will be conducted by flowing
compressed ammonia gas standards into the in-line or external gas cell to achieve the desired
ammonia concentrations. The ammonia and the zero air will be supplied as described above or
until the CEM readings reach equilibrium, at which point the measured concentration and the
spike gas flow rate will be recorded. The volume/length of the gas cell, the optical pathlength,
and the known concentration of the gas standard will be used to calculate the theoretical increase
in cross-stack concentration introduced during the run.

For the extractive CEMs, the dynamic spiking will be conducted by injecting ammonia
gas into the probe tip upstream of the particulate filter such that the ammonia passes through as


-------
Page 19 of 39
Version 1.0
Date: 6/25/03

much of the sampling system as possible. The ammonia gas standard should mix with the flue
gas at a ratio of approximately 1 part spike gas to 9 parts flue gas or more dilute. The flow rate
of the compressed gas and the dilution ratio of the spike gas will be used in calculate the
theoretical increase in concentration introduced during the spiking.

4.4 Data Comparisons

This section describes how the reference and CEM data will be used and compared to
quantify the performance of the CEMs. Table 4-2 summarizes the data that will be used for the
verification comparisons.

The results of the dynamic spiking will be used to assess accuracy of the CEM results
relative to calculated ammonia concentrations determined from the spike gas concentration and
flow rate. For each spiking run, the difference between the ammonia concentration measured by
the CEM and the calculated ammonia concentration from spiking will be determined. The
differences will be used to assess accuracy of the CEM results as described in Section 5.1.

For comparison to the reference method results, the measurements from each of the
CEMs will be separately averaged over each of the individual reference sampling periods.
Comparability with the reference method will be assessed by comparing the averaged CEM
results during the reference sampling periods with the reference results from the respective
periods as described in Section 5.2. A total of 30 ammonia reference sampling runs is planned in
the verification test (15 during each of the first and fifth weeks of testing), with two reference
method sampling trains operating simultaneously in each sampling run. Thus a total of 60
reference samples will be used to evaluate comparability of the CEMs relative to the reference
method.

Linearity of the CEM response will be assessed from the dynamic spiking results. The
measured ammonia concentrations and the calculated ammonia concentrations will be used to
assess linearity in the range from the background concentration to approximately 8 ppmv above
background. A total of 72 data points (36 background and 12 each at 2, 5, and 8 ppmv above
background) will be used for this assessment.


-------
Page 20 of 3 9
Version 1.0
Date: 6/25/03

Table 4-2. Summary of Data to be Obtained in Ammonia CEM Verification Test

Performance
Parameter

Objective

Comparison Based On

Total Number of
Data Points for
Verification

Accuracy

Determine degree of quantitative
agreement with compressed gas
standard

Dynamic spiking with
ammonia gas standards

36

Comparability

Determine degree of quantitative
agreement with reference method

Reference method results

60

Linearity

Determine linearity of response over
a range of ammonia concentrations

Dynamic spiking with gas
standards

72

Precision

Determine repeatability of
successive measurements at fixed
ammonia levels

Repetitive measurements under
constant facility conditions
measured over the duration of
each reference method
sampling run, and each
dynamic spiking run

66

Cal/Zero Drift

Determine stability of zero gas and
span gas response over successive
days

Zero gas and NH3 gas standard

10

Response Time

Determine rise and fall time

Recording successive readings
at start and end of sampling
NH3 gas standard

6

Precision of the CEMs will be assessed based on the individual measurements performed
by each CEM over the duration of each reference method sampling run. For example, if a CEM
provides an updated measurement every 5 minutes, then over a twenty five minute sampling run
a total of 5 readings would be obtained. The average and standard deviation of those readings
will be calculated to assess precision. This procedure will be applied to each of the 30 of the
reference method sampling intervals, and each of the 36 dynamic spiking runs at elevated
ammonia concentrations.

Calibration and zero drift will be verified based on challenging the CEMs with zero gas
and with a compressed gas standard of ammonia on each test day during the first and fifth weeks
of the test. Thus up to 10 data points will be used to assess zero drift, and an equal number to
assess calibration drift. Calibration drift of the CEMs will be assessed at approximately 80% of
full scale for each of the respective CEMs.


-------
Page 21 of 39
Version 1.0
Date: 6/25/03

CEM response time will be assessed once in each of the first, third, and fifth weeks of the
test, by recording successive CEM readings as the CEM responds to the ammonia gas standard,
or returns to baseline after analysis of that standard. The former readings will indicate the CEM
rise time, and the latter the CEM fall time.

No additional test activities will be required to determine the data completeness achieved
by the CEMs. Data completeness will be assessed by comparing the data recovered from each
CEM to the amount of data that would be recovered upon completion of all portions of these test
procedures.

Setup and maintenance needs will be documented qualitatively, both through observation
and through communication with the vendors (or their trained representatives) during the test.
Factors to be noted include the frequency of scheduled maintenance activities, the downtime of
the CEM, and the number of staff operating or maintaining it during the verification test.


-------
Page 22 of 3 9
Version 1.0
Date: 6/25/03

5.0 STATISTICAL CALCULATIONS

The statistical calculations to be used to verify CEM performance are described below.
In all cases, measurement results from both the reference method and the CEMs undergoing
testing are to be reported in units of ppmv on a dry basis at 20 °C, 1 atmosphere pressure, and the
actual flue gas 02 content. All calculations will be performed using Microsoft Excel™.

5.1 Relative Accuracy

The relative accuracy (RA) of the CEMs with respect to the ammonia gas standards will
be assessed using Equation 1:

d

+ t

n-1

RA =

S^_
4n

x 100%

(1)

x

where d refers to the difference between the calculated ammonia concentration from the dynamic
spiking and the average of the CEM measurements recorded during the respective spiking
periods, and x corresponds to the calculated spike concentration. Sd denotes the sample standard
deviation of the differences, while t^ is the t value for the 100(1 - a)th percentile of the
distribution with n-1 degrees of freedom. The relative accuracy will be determined for an a
value of 0.025 (i.e., 97.5 percent confidence level, one-tailed). The RA calculated in this way
can be interpreted as an upper confidence bound for the relative bias of the analyzer, i.e., 4^,
where the superscript bar indicates the average value of the differences or of the reference
values. Relative accuracy will be calculated separately at each of the spiking levels.


-------
Page 23 of 39
Version 1.0
Date: 6/25/03

5.2 Comparability

Comparability between the CEM results and the EPA CTM027 reference method results
will be assessed using Equation 1, in which d represents the difference between the average of
paired reference method results and the average of the CEM results from the period during which
the paired reference method samples were collected, and x corresponds to the average of the
paired reference method results. Comparability will be calculated using all EPA CTM 027
reference method sample results (assuming all reference method samples can be treated as
independent results). The impact of the number of data points (n) on the RA value will be noted
in the verification report.

5.3 Linearity

Linearity will be assessed by a linear regression analysis of the dynamic spiking data
using the calculated ammonia concentrations as the independent variable and the CEM results as
the dependent variable. Linearity will be expressed in terms of slope, intercept, and coefficient
of determination (r2).

5.4 Precision

Precision will be calculated in terms of the percent relative standard deviation (RSD) of a
series of CEM measurements made over the duration of each reference method sampling run
with ammonia injected at a constant level into the SCR zone, and during each of the dynamic
spiking runs. During each reference method sampling run, and during each dynamic spiking run,
all readings from a CEM undergoing testing will be recorded, and the mean and standard
deviation of those readings will be calculated. Precision (P) will then be determined as:

SD

p = ^x 100	(1)

X


-------
Page 24 of 3 9
Version 1.0
Date: 6/25/03

where SD is the standard deviation of the CEM readings and X is the mean of the CEM
readings. This calculation will be done for each CEM, using the CEM data collected during
every reference method sampling run and dynamic spiking run. The verification report will note
that the calculated precision is subject to the variability of the host facility, and not only to the
CEM variability. Although no comparison among CEMs will be made, all CEM data from the
periods of reference sampling will be reviewed, to assess whether the consensus of the CEM data
indicates an unusual variation in the test facility itself. If such a variation is indicated, that
finding will be noted in all verification reports.

5.5 Calibration and Zero Drift

Calibration and zero drift will be reported in terms of the mean, relative standard
deviation, and range (maximum and minimum) of the readings obtained from the CEM in the
daily sampling of the same ammonia standard gas, and of zero gas. Up to 10 ammonia standard
readings, and up to 10 zero readings, will be used for this calculation. This calculation, along
with the range of the data, will indicate the day-to-day variation in zero and standard readings.

5.6 Response Time

Response time will be assessed in terms of both the rise and fall times of each ammonia
CEM when sampling the ammonia gas standard. Rise time (i.e., 0% - 95% response time) will
be determined by recording all CEM readings as the gas supplied to the CEM is switched from
zero gas to the ammonia standard. Once a stable response has been achieved with the gas
standard, the fall time (i.e., the 100% to 5% response time) will be determined in a similar way,
by recording all CEM readings as the gas supplied is switched from the ammonia standard back
to zero gas. For CEMs which provide periodic rather than continuous readings, determination of
rise and fall times may involve interpolation between readings.

Rise and fall times will each be determined once for each CEM in each of the first, third,


-------
Page 25 of 39
Version 1.0
Date: 6/25/03

and fifth weeks of the test. Thus a total of six data points will be obtained relevant to response
time for each CEM. Rise and fall times will be reported in units of seconds.

6.0 MATERIALS AND EQUIPMENT

6.1 Gases and Chemicals

6.1.1	High Purity Nitrogen/Air

The high purity gases used for zeroing of the CEMs will be commercial ultra-high purity
(UHP, i.e., minimum 99.999% purity) air or nitrogen.

6.1.2	Ammonia Standard Gases

Compressed gas standards containing ammonia will be obtained for use in the calibration
checks and the dynamic spiking activities of the CEMs. These will consist of ammonia in a
nitrogen matrix, at levels appropriate to achieve increases above background concentrations of
approximately 2, 5, and 8 ppmv during dynamic spiking, and for use in the calibration checks
performed during the first and last weeks of testing. Multiple cylinders of uniform concentration
will be obtained, if required to meet the gas consumption rates of the CEMs during the test.

6.2 Reference Method

6.2.1 Sampling Trains

The glassware, filters, and associated equipment for performance of the reference
method(4) sampling will be supplied by the subcontractor and will meet the requirements of the
EPA conditional test method for ammonia measurement. Multiple trains will be supplied so that
six trains (i.e., three sampling runs with two trains each) may be sampled in a single day, in


-------
Page 26 of 3 9
Version 1.0
Date: 6/25/03

addition to at least three blank trains and three spiked trains per week. Preparation, sampling,
sample recovery, and cleaning of used trains will be the responsibility of the contractor in this
verification test.

6.2.2 Analysis Equipment

Laboratory equipment for sample recovery and analysis will be provided by either the
subcontractor or by Battelle, depending on who will conduct the analysis. This equipment will
include all chemicals and solutions for preparation of the samples for analysis as well as for the
analysis of the samples. An ISE will be provided for on-site analysis, and an IC will be available
for laboratory analysis.

6.3 Facility Monitoring Equipment

This verification will make use of monitoring equipment already integrated into the host
facility. This equipment includes monitors for major flue gas constituents (02, C02) and for
chemical contaminants (CO, NOx, S02), as well as sensors for temperature and pressure and may
include ammonia CEM systems already installed at the facility. These devices are considered
part of the host facility for purposes of this test, and will be operated by the host facility during
this verification according to normal facility procedures.

6.4 Equipment Used for Performance Evaluation Audits

As described in Section 7.3.2, performance evaluation (PE) audits will be performed for
the 02, C02, temperature, and pressure measurements in the flue gas. Those PE audits will be
performed by conducting a parallel measurement using an independent monitoring device. The
devices to be used will be provided by Battelle, and may include the following:

Paramagnetic 02 monitor


-------
Page 27 of 3 9
Version 1.0
Date: 6/25/03

•	Infrared C02 monitor
Thermocouple temperature indicator

•	Aneroid barometer

Magnehelic differential pressure indicator

•	Flow meter.

These devices will have been calibrated by the manufacturer or by Battelle's Instrument
Laboratory within the six months immediately preceding the verification test, or calibrated on
site as necessary. In addition, a calibrated set of weights will be used, to audit the balance used
to weigh impingers from the reference method trains (used for determining flue gas H20
content).

A NIST-traceable ammonia standard will also be used to spike three blank reference
method trains, in each of the first and fifth weeks of the test to assess the overall ammonia
measurement. NIST-traceable ammonia standards will be used to prepare blind audit samples to
assess the performance of both the ISE and the IC.


-------
Page 28 of 39
Version 1.0
Date: 6/25/03

7.0 QUALITY ASSURANCE/QUALITY CONTROL

The subcontractor^s) performing the reference method sampling must perform all
required quality assurance/quality control (QA/QC) activities stated in the method(4). This
includes provision of blank sampling trains (three per week), and of blank sampling materials
(filters, reagent solution blanks) in the field. Documentation of these activities will be required
for inclusion in the verification data file. Deviation from the reference method(4) will occur in
that the concentrations and volumes of the solutions used in the impingers will be those
identified in the draft ASTM method(5). Spiking of reference trains will be performed by Battelle
staff, as described in Section 7.3.2.

7.1 Equipment Calibrations

7.1.1	Host Facility Equipment

The host facility CEMs and other monitoring devices noted in Section 6.3 will be
calibrated by host facility staff according to normal facility procedures. All calibration results
must be documented for inclusion in the verification test data files and verification report.

7.1.2	Reference Method Sampling Equipment

Equipment used for the collection of the reference samples will be calibrated by the
subcontractor(s) according to the procedures described in the reference method(4). All calibration
results must be documented for inclusion in the verification test data files and verification report.

7.1.3	Analytical Equipment

Analysis of the reference samples will be conducted both on-site using an ISE and in a
laboratory using IC. The ISE analysis will be used only for initial QA purposes to ensure that


-------
Page 29 of 3 9
Version 1.0
Date: 6/25/03

the ammonia levels in the duct are within the expected range and to ensure that the reference
sampling is being conducted properly. The ISE will be calibrated according to the
manufacturer's recommendations using at least three different solutions prepared from NIST-
traceable ammonia standards. Immediately after calibration, at least three standard solutions will
be reanalyzed using the ISE. If the ISE reading does not agree between the standard
concentration of the solutions within 10% the calibration will be repeated. The calibration will
be conducted on-site daily during each week of reference sampling and will include ammonia
concentrations that will bracket the concentrations expected in the reference samples.

The equipment used for the IC analysis will be calibrated by staff of the laboratory
performing the analysis. The calibration will be conducted according to the manufacturer
recommendations and the requirements of the reference method,(4) and will include
concentrations of ammonia standard solutions that bracket the expected concentration of the
sample solutions. The calibration will be acceptable if the r2 of the calibration curve is >0.95.
All calibration results must be documented for inclusion in the verification test data files and
verification report.

7.1.4 Calibration Check/Dynamic Spiking Equipment

The dry gas meter used for measurement of the spike gas flow rate during the calibration
checks and the dynamic spiking activities will be calibrated by the Battelle Instrument
Laboratory against a NIST-traceable flow transfer standard. The date of the calibration will be
within one year of the date of the dynamic spiking activities.


-------
Page 30 of 39
Version 1.0
Date: 6/25/03

7.2 QA/QC Samples

7.2.1	Field Blanks

During each week of reference method sampling, a total of three sampling trains will be
used as field blank samples. These trains will be prepared and transported to the sampling
location but will not be used to collect a sample of flue gas. The trains will then be disassembled
and the field blank solutions will be analyzed on-site by ISE to ensure that the background
concentration due to on-site handling and exposure is negligible relative to the ammonia content
of the samples. If background levels are greater than 10% of the sample concentrations, no
additional reference sampling will be conducted until the cause of the contamination is identified
and rectified. The field blank solutions will also be analyzed in the laboratory by IC.

7.2.2	Laboratory Blanks

Laboratory blank solutions will be prepared for both ISE and the IC analysis. The
solutions will be analyzed prior to analysis of the reference samples. A laboratory blank solution
will be analyzed after every 10th reference method sample to ensure no drift in the ISE or IC
instrumentation. If the blank levels are greater than 10% of the expected sample concentrations,
the cause of the contamination is identified and rectified, and all analyses performed after the
most recent acceptable blank will be invalidated and analysis of those samples will be repeated
(if possible).

7.2.3	Laboratory Spikes

Laboratory spike solutions will be prepared with concentrations approximately equal to
ammonia concentrations expected from the collection of a 5 ft3 sample of flue gas with 2 ppmv
ammonia. These solutions will be prepared for both ISE and the IC analysis using NIST-
traceable ammonia solutions. The solutions will be analyzed prior to analysis of the reference


-------
Page 31 of 39
Version 1.0
Date: 6/25/03

samples. A laboratory spike solution will be analyzed after every 10th reference method sample
to ensure no drift in the ISE or IC instrumentation. If the measured concentrations are not within
±10% of the spike concentration, the cause of the discrepancy will be investigated and rectified
if possible. If such a discrepancy is observed, all analyses performed after the most recent
acceptable spike will be invalidated and analysis of those samples will be repeated (if possible).

7.3 Assessment and Audits

7.3.1	Technical Systems Audits

Battelle's ETV Quality Manager, Mr. Zachary Willenberg, will perform a technical
systems audit (TSA) once during the performance of this verification test. The purpose of this
TSA is to ensure that the verification test is being performed in accordance with this test/QA
plan and that all QA/QC procedures are being implemented. In this audit, Mr. Willenberg may
review the reference sampling and analysis methods used, compare actual test procedures to
those specified in this plan, and review data acquisition and handling procedures. Mr.

Willenberg will prepare a TSA report, the findings of which must be addressed either by
modifications of test procedures or by documentation in the test records and report.

At EPA's discretion, EPA QA staff may also conduct an independent on-site TSA during
the verification test. The TSA findings will be communicated to testing staff at the time of the
audit, and documented in a TSA report.

7.3.2	Performance Evaluation Audit

A performance evaluation (PE) audit will be conducted to assess the quality of the
measurements made in this verification test. This audit addresses only those measurements that
factor into the data used for verification, i.e., the CEMs being verified and the vendors operating
these CEMs are not the subject of the performance evaluation audit. This audit will be
performed once during the verification test, and must be performed by analyzing a standard or


-------
Page 32 of 39
Version 1.0
Date: 6/25/03

comparing to a reference that is independent of standards used during the testing. For most of
the key measurements, this audit will be done by comparing data from the facility equipment to
that from a second analyzer or monitor, operated simultaneously. For example, the PE audit of
02 data will involve sampling with a second 02 analyzer at the same point in the duct, and
comparing results. The will be calculated as the difference between the two readings divided by
the audit reading. Similar comparisons will be made for temperature, pressure, and C02. In
addition, the balance used to determine flue gas H20 content by means of the reference method
impinger samples will be checked with a calibrated set of weights different from those used to
calibrate the balance for use. Table 7-1 summarizes the PE audits that will be done. These
audits will be the responsibility of Battelle staff, and will be carried out with the cooperation of
host facility staff.

Table 7-1. Summary of PE Audits

Parameter

Audit Procedure

Expected Tolerance

02

Compare to independent 02 measurement

±1% of 02 reading

co2

Compare to independent C02 measurement

±10% of C02 reading

Temperature

Compare to independent temperature measurement

±2% absolute temperature

Barometric Pressure

Compare to independent pressure measurement

±0.5 inch of H20

Flue Gas Differential
Pressure

Compare to independent pressure measurement

±0.5 inch of H20

Mass (H20)

Check balance with calibrated weights

±1% or 0.5 g, whichever is
larger

Ammonia (overall
measurement)

Spike reference method trains

± 20% bias in spike recovery

Ammonia (ISE
analysis)

Blind audit sample

± 10% of standard
concentration

Ammonia (IC analysis)

Blind audit sample

± 10% of standard
concentration

These PE audits will be carried out once during the period of operation at the host
facility. Battelle will supply the equipment or standards needed to make the independent PE
measurements. If agreement outside the indicated tolerance is found, the PE audit will be


-------
Page 33 of 39
Version 1.0
Date: 6/25/03

repeated. Further failure to achieve agreement will result in re-calibration of the independent
measurement device, and continued lack of agreement will result in all relevant data being
flagged.

The PE audit will include spiking reference method sampling trains with known amounts
of ammonia, and conducting sample analysis on the train without sampling the combustion gas.
A NIST-traceable ammonium standard solution will be used for that purpose. During each week
of sampling, three blank trains will be prepared spiked with a known amount of an ammonia
standard solution, such that the ammonia concentration in the sample solution is approximately
equal to the concentration expected from the collection of a 5 ft3 sample of flue gas with 2 ppmv
ammonia. The spiked trains will be transported to the sampling location but will not be used to
collect a sample of flue gas. The trains will then be disassembled and the spiked samples will be
analyzed on-site by ISE and the percent recovery will be calculated. Agreement of ammonia
determined in sample analysis with that spiked into the sample train is expected to be within 20
percent. If the recovery of the field spikes is not >80% and <120%, no additional reference
sampling will be conducted until the cause of the discrepancy is investigated and rectified if
possible. Because reference sample analysis is performed on site by ISE, PE audit results for the
overall ammonia measurement will be available during the test, and will be used to improve
reference method procedures, if necessary.

The performance of the ISE and the IC used to analyze the reference samples will be
audited by analyzing an ammonium standard that is independent of those used for the calibration.
This sample will be provided as a blind audit sample and the operator of the ISE and the IC
should not be aware of the concentration of the sample. If agreement between the measured
concentration and the standard concentration is not within ±10%, the cause of the discrepancy
will be investigated and rectified if possible.


-------
Page 34 of 39
Version 1.0
Date: 6/25/03

7.3.3	Data Quality Audit

Battelle's Quality Manager will audit at least 10 percent of the verification data acquired
in the verification test. The Quality Manager will trace the data from initial acquisition, through
reduction and statistical comparisons, and to final reporting. All calculations performed on the
data undergoing audit will be checked.

7.3.4	Assessment Reports

Each assessment and audit will be documented in accordance with Section 3.3.4 of the
QMP for the AMS Center.(1) Assessment reports will include the following:

•	Identification of any adverse findings or potential problems

•	Space for response to adverse findings or potential problems

•	Possible recommendations for resolving problems

•	Citation of any noteworthy practices that may be of use to others
Confirmation that solutions have been implemented and are effective.

7.3.5	Corrective Action

The Battelle Quality Manager during the course of any assessment or audit will identify
to the technical staff performing experimental activities any immediate corrective action that
should be taken. If serious quality problems exist, the Battelle Quality Manager is authorized to
stop work.

Once the assessment report has been prepared, the Verification Test Coordinator will
ensure that a response is provided for each adverse finding or potential problem, and will
implement any necessary followup corrective action. The Battelle Quality Manager will ensure
that follow-up corrective action has been taken.


-------
Page 35 of 39
Version 1.0
Date: 6/25/03

8.0 DATA ANALYSIS AND REPORTING
8.1 Data Acquisition

Data acquisition in this verification test includes recording of the data from the CEMs
undergoing testing, documentation of sampling conditions and analytical results from the
reference method, and recording of operational data such as combustion source conditions, test
temperatures, the times of test activities, etc.

Data acquisition for the commercial CEMs undergoing verification will be performed by
the CEM vendors during the test. Each CEM must have some form of data acquisition device,
such as a digital display whose readings can be recorded manually, a printout of analyzer
response, or an electronic data recorder that stores individual analyzer readings. The vendor will
be responsible for reporting the response of the CEM for the entire test period. The CEM data
are to be provided to Battelle regularly, and must include all individual readings of the CEM
listed by time of day. Averaged results, e.g., ammonia data averaged over the period of a
reference method sampling run, may also be provided, if available. If not provided, averaging
will be performed by Battelle in data processing. Electronic data files are the preferred means of
data transfer, with Excel® or ASCII file formats preferred. Electronic files requiring vendor's
proprietary software will be supplied along with the software required to view the data.

Other data will be recorded in laboratory record books provided by Battelle and
maintained by Battelle, vendor, and subcontractor staff involved in the testing. These records
will be reviewed by Battelle to identify and resolve any inconsistencies. All written records
must be in ink. Any corrections to notebook entries, or changes in recorded data, must be made
with a single line through the original entry. The correction is then to be entered, initialed and
dated by the person making the correction.

In all cases, strict confidentiality of data from each vendor's CEM, and strict separation
of data from different CEMs, will be maintained. Separate files (including manual records,
printouts, and/or electronic data files) will be kept for each CEM. At no time during verification
testing will Battelle staff engage in any comparison in performance of the participating CEMs.


-------
Page 36 of 39
Version 1.0
Date: 6/25/03

Table 8-1 summarizes the types of data to be recorded; how, how often, and by whom the
recording is made; and the disposition or subsequent processing of the data. The general
approach is to record all test information immediately and in a consistent format throughout all
tests. Data recorded by the vendors is to be turned over to Battelle staff immediately upon
completion of each test day. Identical file formats will be used to make quantitative evaluations
of the data from all CEMs tested, to assure uniformity of data treatment. This process of data
recording and compiling will be overseen by the Verification Test Coordinator.

8.2 Data Review

Records generated in the verification test will be reviewed by a Battelle staff member
within two weeks after the completion of the test, before these records are used to calculate,
evaluate, or report verification results. These records may include laboratory record books;
operating data from the combustion source; data from the CEMs; or reference method analytical
results. This review will be performed by a Battelle technical staff member involved in the
verification test, but not the staff member that originally generated the record. The host facility,
subcontractor and/or vendor staff will be consulted as needed to clarify any issues about the data
records. The review will be documented by the person performing the review by adding his/her
initials and date to a hard copy of the record being reviewed.

8.3 Reporting

The statistical data comparisons described in Section 5.0 will be conducted separately for
each commercial ammonia CEM tested. Separate verification reports will then be prepared, each
addressing the CEM provided by one commercial vendor. The verification report will present
the test data, as well as the results of the statistical evaluation of those data.


-------
Page 37 of 39
Version 1.0
Date: 6/25/03

Table 8-1. Summary of Data Recording Process

Data to be Recorded

Responsible
Party

Where Recorded

How Often
Recorded

Disposition of
Data00

Dates, times of test
events

Battelle/AEP

Laboratory record
books

Start/end of test,
and at each change
of a test parameter.

Used to

organize/check test
results; manually
incorporated in data
spreadsheets as
necessary.

Test parameters
(temperature,
analyte/interferant
identities and
concentrations, gas
flows, etc.)

AEP/

subcontractor

Laboratory record
books

When set or
changed, or as
needed to document
stability.

Used to

organize/check test
results, manually
incorporated in data
spreadsheets as
necessary.

NH3 CEM readings

Vendor or
designee

Data acquisition
system (data logger,
PC, laptop, etc.).

Continuously at
specified
acquisition rate
throughout CEM
operation.

Electronically
transferred to
spreadsheets

Reference method
sampling data

Subcontractor

Laboratory record
books or file data
sheets as appropriate

At least at start/end
of reference sample,
and at each change
of a test parameter.

Used to

organize/check test
results; manually
incorporated in data
spreadsheets as
necessary.

Reference method
sample analysis, chain
of custody (CoC), and
results

Subcontractor
or Battelle

Laboratory record
books, CoC forms,
data sheets, or data
acquisition system, as
appropriate.

Throughout sample
handling and
analysis process

Transferred to
spreadsheets

(a) All activities subsequent to data recording are carried out by Battelle.

The verification report will briefly describe the ETV program and the AMS Center, and
will describe the procedures used in verification testing. These sections will be common to each
verification report resulting from this verification test. The results of the verification test will
then be stated quantitatively, without comparison to any other CEM tested, or comment on the
acceptability of the CEM's performance. The preparation of draft verification reports, the
review of reports by vendors and others, the revision of the reports, final approval, and the
distribution of the reports, will be conducted as stated in the Generic Verification Protocol for
the Advanced Monitoring Systems Pilot.(3) Preparation, approval, and use of Verification


-------
Page 38 of 39
Version 1.0
Date: 6/25/03

Statements summarizing the results of this test will also be subject to the requirements of that
same Protocol.

9.0 HEALTH AND SAFETY

The verification test described in this test/QA plan will be performed at the AEP host
facility. All participants in this verification test (i.e., Battelle, EPA, subcontractor, and vendor
staff) will adhere to the health and safety requirements of the facility. Vendor staff will only be
operating their CEMs during the verification test. They are not responsible for, nor permitted to,
operate the combustion source, or perform any other verification activities identified in this
test/QA plan. Operation of the CEMs themselves does not pose any known chemical, fire,
mechanical, electrical, noise, or other potential hazard.

All visiting staff at the host facility will be given a site-specific safety briefing prior to
the installation and operation of the CEMs. This briefing will include a description of
emergency operating procedures (i.e., in case of fire, tornado, laboratory accident) and
identification and location and operation of safety equipment (e.g., fire alarms, fire
extinguishers, eye washes, exits).


-------
Page 39 of 39
Version 1.0
Date: 6/25/03

10.0 REFERENCES

1.	Quality Management Plan (QMP) for the ETV Advanced Monitoring Systems Center,
U.S. EPA Environmental Technology Verification Program, prepared by Battelle,
Columbus, Ohio, Version 4.0 December 2002.

2.	Environmental Technology Verification Program Quality Management Plan, EPA/600/R-
03/021, December 2002.

3.	Generic Verification Protocol for the Advanced Monitoring Systems Pilot, Battelle,
Columbus, Ohio, November 1998.

4.	Procedure for the Collection and Analysis of Ammonia in Stationary Sources,

Conditional Test Method 027, U.S. Environmental Protection Agency, Research Triangle
Part, North Carolina, August 1997.

5.	Standard Specification for Collection and Analysis of Ammonia Nitrogen in Flue Gas
Using Wet Chemical Sampling and Specific Ion Analysis, Draft Standard, ASTM, West
Conshohocken, Pennsylvania, October, 2000.

6. Field Test of Ammonia Collection/Analysis Method, Draft Report, U.S. Environmental
Protection Agency, Research Triangle Park, North Carolina, September 1995.


-------