Appendix C

Hudson River PCBs Site
Record of Decision





&

%

%

w

PRO^

t,

w
o

**¦

Administrative Record
Index of Documents

Organized by File Structure


-------
HUDSON RIVER PCBs
ADMINISTRATIVE RECORD

INDEX OF DOCUMENTS
FILE STRUCTURE FORMAT

1.0	SITE IDENTIFICATION

1.1	Background

001-0043-0046 Decision in the matter of the application of

NYSDEC Division of Water to dredge PCBs from the
Hudson River and to construct and operate a
hazardous waste management facility in Fort
Edward, New York, by Thomas C. Jorling,
Commissioner, NYSDEC, January 9, 1989.

001-0091-0100	Plan: Hudson River PCB Project Action Plan,
prepared by NYSDEC, December 15, 1989.

002-0739-07	99 Recommendation of the Parties for a Final EPA Rule

on Inadvertent Generation of PCBs, April 13, 1983.

1.1 Background-RCRA and Other Information

P. 100001 - Report: Summary of Hudson River PCB Study Results,
100093 prepared by L. Hetling, F. Horn, and J.

Tofflemire, New York State Department of
Environmental Conservation Bureau of Water
Research, April 1978 (Revised - July 1978.)

P. 100094 - Report: PCB Transport in the Ft. Edward Area,
100108 prepared by T. J. Tofflemire, undated.

P. 100109 - Interim Opinion and Order: File No. 2833, in the
100186 Matter of Alleged Violations of Sections 17-0501,
17-0511 and 11-0503 of the Environmental
Conservation Law of the State of New York by
General Electric Company, Respondent, commenced on
September 8, 1975 by the NYS DEC, February 9,

1976.

1.3 Preliminary Assessment Reports

P. 100187 - Documentation Records for Hazard Ranking System.
100213 (Attachment: Surface Water Data: New York State
Environmental Quality Review "PCB Hot Spot
Dredging Program, Upper Hudson River, New York,
Draft Environmental Impact Statement", prepared by


-------
Malcolm Pirnie, Inc., prepared for NYS DEC,
September 1980.)

1.5 Previous Operable Unit Information

001-0001-0042 Record of Decision for the Hudson River PCBs Site,
Glen Falls, New York, by Lee M. Thomas, EPA
Administrator, September 25, 1984.

001-0065-0074 Report: The 1984 Superfund Decision for the Hudson
River - The Case for Reconsideration, prepared by
the NYSDEC, August 25, 1989.

P. 100226 - Report: Feasibility Study, Hudson River PCBs Site,

	100852 New York, Volume 1, prepared by NUS Corporation,

prepared for U.S. EPA, Region II, April 1984.

1.6 Correspondence

001-0075-0075 Letter to Patrick Quinn, US EPA, from Benjamin A.

Gilman, U.S. Congress, re: concern over the
continued presence of PCBs in the Hudson River and
requesting a report on PCBs in the Hudson River,
December 4, 1989.

001-007 6-007 6 Letter to Benjamin A. Gilman, U.S. Congress, from
John E. Sanders, Hudson River PCB Settlement
Advisory Committee, re: comments on EPA's Record
of Decision and summarizing the history and
current status of the Hudson River PCBs situation,
September 20, 1989.

001-0077-0077 Letter to Douglas J. Tomchuk, U.S. EPA, from John
E. Sanders, Hudson River PCB Settlement Advisory
Committee, re: comments on the proposed capping of
remnant deposits in Fort Edward, New York, August
31, 1989.

001-0078-0090 Written comments from John E. Sanders, Hudson
River PCB Settlement Advisory Committee, re:
public hearing conducted by EPA in
Fort Edward, New York on August 29, 1989, with
enclosed newspaper articles, August 30, 1989.

001-0101-0104 Letter to Langdon Marsh, Commissioner, NYSDEC,

from C. Eristoff-Sidamon, Regional Administrator,

2


-------
U.S. EPA, re: reassessment of the no-action
alternation contained in EPA's September 25, 1984,
Record of Decision for the Hudson River PCBs site,
December 19, 1989.

P. 100214 - Letter to Mr. William Muszynski, Acting Regional
100216 Administrator, U.S. EPA, Region II, from Mr.

Langdon Marsh, Executive Deputy Commissioner and
Mr. James A. Sevinsky, Assistant Attorney General
In Charge, Environmental Protection Bureau, New
York State Department of Environmental
Conservation, re: State comprehensive plan for an
interim remedy in the Hudson River and at
surrounding PCB contaminated disposal sites, July
26, 1986.

P. 100217 - Letter to Mr. Richard Caspe, Director, Emergency
100219 and Remedial Response Division, U.S. EPA, Region

II, from Angus Macbeth, Esq., Sidley & Austin, re:
Hudson River Superfund Site, November 6, 1997.

P. 100220 - Letter to Angus Macbeth, Esq., Sidley & Austin,
100223 from Mr. Douglas Fisher, Assistant Regional

Counsel, Office of Regional Counsel, U.S. EPA,
Region II, re: Hudson River PCBs Superfund Site,
January 7, 1998.

P. 100224 - Letter to Mr. Douglas Fisher, Assistant Regional
100225 Counsel, Office of Regional Counsel, U.S. EPA,
Region II, from Augus Macbeth, Esq., Sidley &
Austin, re: Hudson River PCBs Superfund Site, May
5, 1998.

2.0 REMOVAL RESPONSE

2.3 EE/CA Approval Memorandum (for non-time critical removals)

P. 200001- Memorandum to Mr. Richard L. Caspe, Director,
200011 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. J. Jeff Josephson,
Remedial Project Manager, Emergency and Remedial
Response Division, U.S. EPA, Region II, re:
Engineering Evaluation/Cost Analysis Approval
Memorandum, December 12, 2000.

3


-------
P. 200012 - Report: Hudson River PCBs Superfund Site, List
200013 of References for Engineering Evaluation/Cost
Analysis Approval Memorandum, prepared by U.S.
EPA, Region II, December 12, 2000.

3.0 REMEDIAL INVESTIGATION

3.1 Sampling and Analysis Plans

P. 308969 - Plan: Ft. Edward Dam PCB Remnant Deposit

	3 0 902 4 Containment Environmental Monitoring Program

Construction Monitoring Plan, prepared by Harza
Engineering Company with Yates & Auberle, Ltd.,
prepared for General Electric Company, May 1990.

P. 309025 - Letter to Mr. Walter E. Demick, P.E., Section
309110 Chief, New York Department of Environmental
Conservation, from Mr. John G. Haggard,
Engineering Project Manager, General Electric
Company, Corporate Environmental Programs, re:
Hudson River - Enhanced River Monitoring Project,
August 25, 1995. (Attachment: Report: Sampling
and Analysis Plan, Hudson River Project, River
Monitoring Test, prepared by O'Brien & Gere
Engineers, Inc., prepared for General Electric
Company, Corporate Environmental Programs, August
1995. )

P. 309111 - Plan: Sampling and Analysis Plan, Hudson River PCB

	309152 DNAPL Transport and Water Column Monitoring Study,

prepared by HydroQual, Inc. and O'Brien & Gere
Engineers, Inc., prepared for General Electric
Company, August 1996.

P. 309153 - Plan: Sampling and Analysis Plan, Investigation of

	3 0 917 7 Groundwater Seepage in the Thompson Island Pool

Section of the Upper Hudson River, prepared by
HydroQual, Inc., prepared for General Electric
Company, February 1997.

P. 309178- Plan: Sampling and Analysis Plan, 1997 Hydro

	3 0 9198 Facility Operations and Thompson Island Pool

	Monitoring, Hudson River Project, prepared by

O'Brien & Gere Engineers, Inc., prepared for
General Electric Corporate Environmental Programs,
March 1997.

4


-------
P. 309199 - Plan: Sampling and Analysis Plan, 1997 High Flow

	309221 Monitoring Program, Upper Hudson River, prepared

by HydroQual, Inc., prepared for General Electric
Company, March 1997.

P. 309222 - Plan: Sampling and Analysis Plan, Addendum, 1997

	3 0 9242 Thompson Island Pool Monitoring Hudson River

Proiect, prepared by O'Brien & Gere Engineers,
Inc., prepared for General Electric Corporate
Environmental Programs, August 1997.

P. 309243 - Plan: Field Sampling Plan, Hudson River Project,

	309377 Thompson Island Pool Sediment Coring Program,

prepared by Quantitative Environmental Analysis,
LLC., in association with O'Brien & Gere
Engineers, Inc., prepared for General Electric
Company, June 12, 1998.

P. 309378 - Plan: Field Sampling Plan for Analysis of Food-Web

	309561 Structure of the Upper Hudson River, Spring 1998,

prepared by Exponent, prepared for General
Electric Company, October 1998.

P. 314926 - Plan: Phase 2A, Sampling and Analysis/Quality

	3153 81 Assurance Project Plan, Hudson River PCB

Reassessment RI/FS, Revision 2, prepared by TAMS
Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA Region II, Alternative
Remedial Contracting Strategy (ARCS) for Hazardous
Waste Remedial Services, May 29, 1992.

P. 315382 - Plan: Phase 2B, Sampling and Analysis/Quality

	31554 7 Assurance Project Plan, Volume 1: Flow-Averaged

Water-Column Sampling, Hudson River PCB
Reassessment RI/FS, Revision 1, prepared by TAMS
Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA Region II, Alternative
Remedial Contracting Strategy (ARCS) for Hazardous
Waste Remedial Services, March, 1993.

P. 318752 - Plan: Phase 2A Sampling and Analysis Plan/Quality

	318 8 72 Assurance Project Plan, Hudson River PCB

Reassessment RI/FS, Revision 1, prepared by TAMS
Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA, Region II Alternative
Remedial Contracting Strategy (ARCS) for Hazardous
Waste Remedial Services, March 10, 1992.

5


-------
P. 318873 - Plan: Phase 2A Sampling and Analysis Plan/Quality
319158 Assurance Project Plan, Hudson River PCB

Reassessment RI/FS, Appendices, Revision 1,
prepared by TAMS Consultants, Inc. and Gradient
Corporation, prepared for U.S. EPA, Region II
Alternative Remedial Contracting Strategy (ARCS)
for Hazardous Waste Remedial Services, March 10,
1992 .

P. 319159 - Plan: Phase 2B Sampling and Analysis/Quality
319603 Assurance Project Plan, Volume 2: "Benthic

Invertebrate and Sediment Grab Sampling", Hudson
River PCB Reassessment RI/FS, Revision 0, prepared
by TAMS Consultants, Inc. and Gradient
Corporation, prepared for U.S. EPA, Region II
Alternative Remedial Contracting Strategy (ARCS)
for Hazardous Waste Remedial Services, February
18, 1993.

P. 319604 - Plan: Phase 2B Sampling and Analysis Plan/Quality

	319770 Assurance Project Plan, Volume 1: "Flow-Averaged

Water-Column Sampling", Hudson River PCB
Reassessment RI/FS, Revision 1, prepared by TAMS
Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA, Region II Alternative
Remedial Contracting Strategy (ARCS) for Hazardous
Waste Remedial Services, March, 1993.

P. 319771 - Plan: Quality Assurance Project Plan, Hudson

	32 0211 River Project Sampling and Analysis Program, Final

Revision, prepared by O'Brien & Gere Engineers,
Inc., prepared for General Electric Company
Corporate Environmental Programs, Albany, New
York, May 1993.

P. 320212 - Plan: Phase 2B Sampling and Analysis Plan/Quality

	32 022 0 Assurance Project Plan, Volume 5: "TSS/TOC Water

	Sampling", Hudson River PCB Reassessment RI/FS,

Revision 0, prepared by TAMS Consultants, Inc. and
Gradient Corporation, prepared for U.S. EPA,

Region II Alternative Remedial Contracting
Strategy (ARCS) for Hazardous Waste Remedial
Services, April 26, 1994.

P. 320221 - Plan: Phase 2B Sampling and Analysis Plan/Quality

	32 0 3 93 Assurance Project Plan, Volume 3: "Analysis of

Archived Hudson River Samples", Hudson River PCB
Reassessment RI/FS, Revised Final-Revision 1.1,

6


-------
prepared by TAMS Consultants, Inc. and Gradient
Corporation, prepared for U.S. EPA, Region II
Alternative Remedial Contracting Strategy (ARCS)
for Hazardous Waste Remedial Services, May 18,
1994 .

P. 321569 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
321575 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. Mark D. LaRue for
Mr. John G. Haggard, Engineering Project Manager,
Hudson River Project, General Electric Company,
re: TIP Sediment Coring Program - Sampling and
Analysis Plan, August 21, 1998. (Attachment:

Plan: General Electric Company - Hudson River
Project, TIP Sediment Coring Program, Field
Sampling Plan Addendum, prepared by Quantitative
Environmental Analysis, August 20, 1998.)

P. 322824 - Plan: Hudson River Fish/Sediment PCB Analysis

	322896 Proiect, prepared by New York State Department of

Environmental Conservation, prepared for National
Oceanic and Atmospheric Administration, Seattle,
Washington, Final July 19, 1993.

3.2 Sampling and Analysis Plans

001-1198-1269 Plan: Phase 2A Sampling Plan Review Copy - Hudson
River PCB Reassessment RI/FS, prepared by TAMs
Consultants, Inc., prepared for U.S. EPA,
September 1, 1991.

3.2 Sampling and Analysis Data/Chain of Custody Forms

P. 309562 - Report: Ft. Edward Dam PCB Remnant Deposit

	30 9671 Containment, Environmental Monitoring Program,

	Preconstruction and Construction Monitoring

Studies, Report of 1990 Results March - December
1990, prepared by Harza Engineering Company with
Yates & Auberle, Ltd., prepared for General
Electric Company, January 1992.

P. 309672 - Report: Ft. Edward Dam PCB Remnant Deposit

	30 9968 Containment, Environmental Monitoring Program,

Report of 1991 Results, January - November 1991,
Volume I, prepared by Harza Engineering Company
with Harding Lawson Associates/Yates & Auberle,

7


-------
Ltd., prepared for General Electric Company, March
1992 .

P. 309969 - Report: Ft. Edward Dam PCB Remnant Deposit

	310 3 0 4 Containment, Environmental Monitoring Program,

Report of 1991 Results, January - November 1991,
Volume II - Appendices, prepared by Harza
Engineering Company with Harding Lawson
Associates/Yates & Auberle, Ltd., prepared for
General Electric Company, March 1992.

P. 310305 - Report: Analysis of Sediment Loading to the Upper

	310 35 6 Hudson River During the April 1994 High Flow

Event, prepared by HydroQual, Inc., prepared for
General Electric Company, March 1997.

P. 310357 - Report: Development of Corrections for Analytical

	310 4 4 3 Biases in the 1991 - 1997 GE Hudson River PCB

Database, prepared by HydroQual, Inc., prepared
for General Electric Company, June 1997.

P. 310444 - Report: Report, Correction for Analytical Biases

	310550 in the 1991 - 1997 GE Hudson River PCB Database,

prepared by O'Brien & Gere Engineers, Inc.,
prepared for General Electric Company, Corporate
Environmental Programs, September 1997.

P. 310551 - Memorandum to File (w/attachment), from W. Ayling,
310593 O'Brien & Gere Engineers, Inc., re: 1998 January
High Flow Event Sampling, January 27, 1998.

P. 310594 - Letter to Mr. Douglas Tomchuk, Remedial Project
310977 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Engineering Project Manager, Hudson River
Project, General Electric Company, re: Hudson
River Tip Research Studies - Data Documentation
Report, February 27, 1998. (Attachment: Report:
Data Summary Report, Hudson River Project 1996 -
1997 Thompson Island Pool Studies, prepared by
O'Brien & Gere Engineers, Inc., prepared for
General Electric Company, Corporate Environmental
Programs, February 1998.)

P. 310978 - Report: Data Summary Report, Hudson River Project,

	311086 1998 High Flow Monitoring Program, prepared by

O'Brien & Gere Engineers, Inc., prepared for
General Electric Company, Corporate Environmental
Programs, April 1999.

8


-------
P. 311087 - Report: Data Summary Report, Hudson River Project,

	31142 3 1997 High Flow and Suspended Solids Monitoring

Program, prepared by O'Brien & Gere Engineers,
Inc., prepared for General Electric Company,
Corporate Environmental Programs, April 1999.

P. 311424 - Report: SPMD Sampling Program, Data Summary

	311456 Report, prepared by Quantitative Environmental

Analysis, LLC., prepared for General Electric
Company, October 1999.

P. 311457 - Report: Lower Hudson River Project, Semi-Permeable

	312 0 7 5 Membrane Device, Water Sampling Program, Data

Report, prepared by Quantitative Environmental
Analysis, LLC., prepared for General Electric
Company, November 1999.

P. 315548 - Report: Fort Edward Dam PCB Remnant Containment
315718 1992 Post-Construction Monitoring Program,
prepared by O'Brien & Gere Engineers, Inc.,
prepared for General Electric Company Corporate
Environmental Programs, August 1993.

P. 315719 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region
316185 II, from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Hudson River Data
Documentation Report - 1998 Sediment Sampling
Results, January 27, 1999. (Attachment: Report:
1998 Upper Hudson River Sediment Coring Program
Final Report, prepared by O'Brien & Gere
Engineers, Inc., prepared for General Electric
Company Corporate Environmental Programs, January
1999.)

P. 316186 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region
316386 II, from Mr. Robert G. Gibson, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Hudson River
Monitoring Program 1998 Summary Report and Updated
Sampling and Analysis Plan, February 11, 2000.
(Attachment: Report: Final Hudson River Monitoring
Program 1998 Summary Report, prepared by
Quantitative Environmental Analysis, Inc.,
prepared for General Electric Company, February,
2000 . )

9


-------
P. 316387 - Report: Results of PCB Analysis of Flood Deposit
316449 Samples from January (1/9 through 1/12) High Flow
Event in Upper Hudson River, and Results of GE
High Flow Water Column Sampling in Upper Hudson
River, undated.

P. 316949 - Report: Fort Edward Dam PCB Remnant Containment
317136 1993 Post-Construction Monitoring Program,
prepared by O'Brien & Gere Engineers, Inc.,
prepared for General Electric Company Corporate
Environmental Programs, May 1994.

P. 317137 - Memorandum to Mr. Larry Skinner, New York State

317158 Department of Environmental Conservation, from Mr.
Robert Bauer, New York State Department of
Environmental Conservation, re: Comparison Study
of Contract Labs for Total PCB and % Lipids,
January 17, 1996.

P. 317159 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
317164 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, Mr. Ronald Sloan, Division of
Hazardous Waste Remediation, New York State
Department of Environmental Conservation, and Mr.
Jay Field, Bureau of Hazardous Material
Remediation, National Oceanic and Atmospheric
Administration, from Mr. John G. Haggard,
Engineering Project Manager, Corporate
Environmental Programs, General Electric Company,
re: PCB Analysis of Archived Fish (1990)

Collection Samples, August 13, 1996.

P. 317165 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
317550 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: 1997 Annual Hudson River Monitoring Report,
November 24, 1998. (Attachment: Report: Fort
Edward Dam PCB Remnant Containment, 1997 Post-
Construction Remnant Deposit Monitoring Program,
prepared by O'Brien & Gere Engineers, Inc.,
prepared for General Electric Company Corporate
Environmental Programs, November 1998.)

P. 317551 - Letter to Ms. Alison A. Hess, Project Manager,

317553 U.S. EPA, Region II, from Mr. Adam Ayers, Project
Scientist, General Electric Company, re: Upper

10


-------
Hudson River Submerged Aquatic Vegetation Data
Files, August 25, 2000. (Attachment: Two Upper
Hudson River SAV Data CD ROMs.)

P. 317554 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
3177 69 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. Robert G. Gibson,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Monitoring Program 2000 Summary
Report, April 13, 2001. (Attachment: Report:

Final Hudson River Monitoring Program - 2000
Summary Report, prepared by Quantitative
Environmental Analysis, LLC., prepared for General
Electric Company Corporate Environmental Programs,
April 2 0 01.)

P. 320394 - Report: Hudson River Project, Fall 1990 Sampling

	320463 and Analysis Program, prepared by O'Brien & Gere

Engineers, Inc., prepared for General Electric
Company Corporate Environmental Programs,
Fairfield, Connecticut, June 1991.

P. 320464 - Report: Data Summary Report, Hudson River

	32 04 83 Project, Sampling and Analysis Program "1991 Float

	Survey Program", prepared by O'Brien & Gere

Engineers Inc., prepared for General Electric
Company Corporate Environmental Programs, Albany,
New York, May 1993.

P. 320484 - Report: Data Summary Report, Hudson River

	32 0515 Project, Sampling and Analysis Program "1991

	Hvdrographic Survey of the Upper Hudson River",

prepared by O'Brien & Gere Engineers Inc.,
prepared for General Electric Company Corporate
Environmental Programs, Albany, New York, May
1993.

P. 320516 - Report: Data Summary Report, Hudson River

320657 Project, Sampling and Analysis Program "1991

Sediment Sampling and Analysis Program", prepared
by O'Brien & Gere Engineers Inc., prepared for
General Electric Company Corporate Environmental
Programs, Albany, New York, May 1993.

P. 320658 - Report: Data Summary Report, Hudson River

320686 Project, Sampling and Analysis Program "1991
Thompson Island Pool Total Suspended Solids

11


-------
Study", prepared by O'Brien & Gere Engineers Inc.,
prepared for General Electric Company Corporate
Environmental Programs, Albany, New York, May
1993.

P. 320687 - Report: Data Summary Report, Hudson River

320716 Project, Sampling and Analysis Program "1991-

	1992 High Flow Water Column Monitoring Program",

prepared by O'Brien & Gere Engineers Inc.,
prepared for General Electric Company Corporate
Environmental Programs, Albany, New York, May
1993.

P. 320717 - Report: Data Summary Report, Hudson River

320813 Project, 1991-1992 Sampling and Analysis Program
"Temporal Water Column Monitoring Program",
prepared by O'Brien & Gere Engineers Inc.,
prepared for General Electric Company Corporate
Environmental Programs, Albany, New York, May
1993.

P. 320814 - Report: Data Summary Report, Hudson River

320845 Project, Sampling and Analysis Program "1992

Channel Characterization Program", prepared by
O'Brien & Gere Engineers Inc., prepared for
General Electric Company Corporate Environmental
Programs, Albany, New York, May 1993.

P. 320846 - Report: Data Summary Report, Hudson River

320877 Project, Sampling and Analysis Program, "1992 Food
Chain Study", prepared by O'Brien & Gere Engineers
Inc., prepared for General Electric Company
Corporate Environmental Programs, Albany, New
York, May 1993.

P. 320878 - Report: Data Summary Report, Hudson River

321134 Project, River Monitoring Test, prepared by
O'Brien & Gere Engineers Inc., prepared for
General Electric Company Corporate Environmental
Programs, Albany, New York, January 1996.

P. 321135 - Report: Hudson River Congener-Specific Analysis,
321268 Data Summary and Analysis Report, prepared by EVS
Environment Consultants, Seattle, Washington,
prepared for National Oceanic and Atmospheric
Administration Damage Assessment Center, Silver
Spring, Maryland, July 1997.

12


-------
P. 321269 - Report: Hudson River Congener-Specific Analysis,
321419 Data Summary and Analysis Report, Appendices,

prepared by EVS Environment Consultants, Seattle,
Washington, prepared for National Oceanic and
Atmospheric Administration Damage Assessment
Center, Silver Spring, Maryland, July 1997.

P. 321420 - Hudson River Damage Assessment Floodplain Soil and

	321421 Biota Screening, prepared by Mr. Bob Unsworth,

Industrial Economics. (Attachment: Compact Disk:
HR Data, 03/30/2001.)

3.3 Work Plans

001-0117-0136 Plan: Scope of Work - Hudson River PCB

Reassessment RI/FS, prepared by TAMS Consultants,
Inc., prepared for the U.S. EPA, Region II,
December 1, 1990.

001-0280-0315 Report: Review Copy Phase I - Work Plan

Preliminary Reassessment, Hudson River PCB
Reassessment RI/FS, prepared by TAMS Consultants,
Inc., prepared for U.S. EPA, January 1, 1991.

P. 312076 - Letter to All Interested Parties, from Mr. Douglas
312222 J. Tomchuk, Project Manager, Hudson River PCBs
Site Reassessment, U.S. EPA, Region II, re:

Changes to attached Review Copy of Phase 2 Work
Plan, June 18, 1992. (Attachment: Report: Phase 2
Work Plan and Sampling Plan - Review Copy, Hudson
River PCB Reassessment RI/FS, prepared by TAMS
Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA, Region II, June 1992.)

P. 312223 - Report: Final Phase 2 Work Plan and Sampling Plan,

	312390 Hudson River PCB Reassessment RI/FS, prepared by

TAMS Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA, Region II, September 1992.

3.4 Remedial Investigation Reports

001-0438-0439 Letter to Interested Parties from Kathleen C.

Callahan, Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re:
release of the Hudson River PCBs site Phase I
Report for the Reassessment Remedial

13


-------
Investigation/Feasibility Study, entitled Interim
Characterization and Evaluation, August 23, 1991.

Report: Phase I Report - Review Copy, Interim
Characterization and Evaluation-Hudson River PCB
Reassessment RI/FS, Volume 1(Book 1 of 2),
prepared by TAMs Consultants, Inc., prepared for
U.S. EPA, August 23, 1991.

Report: Phase I Report - Review Copy, Interim
Characterization and Evaluation - Hudson River PCB
Reassessment RI/FS Volume 1(Book 2 of 2), prepared
by TAMs Consultants, Inc., prepared for U.S.
EPA, August 23, 1991.

Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis Database Report,
Hudson River PCBs Reassessment RI/FS, Volume 2A,
prepared by TAMS Consultants, Inc. and Gradient
Corp., prepared for the U.S. EPA, Region II,
October 1, 1995.

002-1033-1217 Report: Phase 2 Report - Review Copy, Further Site

	Characterization and Analysis, Volume 2B -

Preliminary Model Calibration Report, Hudson

	River PCBs Reassessment RI/FS (Book 1 of 2),

prepared by TAMS Consultants, Inc., Limno-Tech,
Inc., Menzie-Cure Associates, Inc. and The Cadmus
Group, Inc., prepared for the U.S. EPA, Region II,
October 1, 1996.

002-1218-1596 Report: Phase 2 Report - Review Copy, Further
Site Characterization and Analysis, Volume 2B -
Preliminary Model Calibration Report, Hudson

	River PCBs Reassessment RI/FS (Book 2 of 2),

prepared by TAMS Consultants, The Cadmus Group,
Inc., and Gradient Corporation, prepared for the
U.S. EPA, Region II, October 1, 1997.

002-1597-1948 Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2C - Data
Evaluation and Interpretation Report, Hudson River
PCBs Reassessment RI/FS (Book 1 of 3), prepared by
TAMS Consultants, The Cadmus Group, Inc., Gradient
Corporation, prepared for the U.S. EPA, Region II
and US Army Corps of Engineers, February 1, 1997.

001-0440-1022

001-1023-1194

002-0800-1032

14


-------
002-1949-2222 Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2C - Data
Evaluation and Interpretation Report, Hudson River
PCBs Reassessment RI/FS (Book 2 of 3), prepared by
TAMS Consultants, The Cadmus Group, Inc., Gradient
Corporation, prepared for the U.S. EPA, Region II
and US Army Corps of Engineers, February 1, 1997.

002-2223-2421 Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2C - Data
Evaluation and Interpretation Report, Hudson River
PCBs Reassessment RI/FS (Book 3 of 3), prepared by
TAMS Consultants, The Cadmus Group, Inc., Gradient
Corporation, prepared for the U.S. EPA, Region II
and US Army Corps of Engineers, February 1, 1997.

P. 300001- Report: Phase 2 Report - Review Copy, Further
300361 Characterization and Analysis, Volume 2C-A Low

Resolution Sediment Coring Report, Addendum to the
Data Evaluation and Interpretation Report, Hudson
River PCBs Reassessment RI/FS, Book 1 of 2,
prepared by TAMS Consultants, Inc., Gradient
Corporation and Tetra Tech, Inc., prepared for the
U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, July 1998.

P. 300362- Report: Phase 2 Report - Review Copy, Further
300521 Characterization and Analysis, Volume 2C-A Low

Resolution Sediment Coring Report, Addendum to the
Data Evaluation and Interpretation Report, Hudson
River PCBs Reassessment RI/FS, Book 2 of 2,
prepared by TAMS Consultants, Inc., Gradient
Corporation and Tetra Tech, Inc., prepared for the
U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, July 1998.

P. 300522- Report: Hudson River PCBs Reassessment RI/FS,
300554 Phase 2 Human Health Risk Assessment, Scope of
Work, prepared by the U.S. EPA, Region II, July
1998 .

P. 300555- Report: Hudson River PCBs Reassessment RI/FS,

300644 Phase 2 Ecological Risk Assessment, Scope of Work,
prepared by TAMS Consultants, Inc., New York, NY
and Menzie-Cura & Associates, Inc., Chelmsford,
MA, prepared for the U.S. EPA, Region II, and U.S.
Army Corps of Engineers, Kansas City District,
September 1998.

15


-------
P. 300645- Report: Report of the Hudson River PCBs Site,

3 0 0 7 96	Modeling Approach Peer Review, Final Report,

prepared by Eastern Research Group, Inc., prepared
for the U.S. EPA, Region II, November 10, 1998.

Report: Hudson River PCBs Reassessment RI/FS,
Responsiveness Summary For Phase 2 Human Health
Risk Assessment, Scope of Work, Book 1 of 1,
prepared by TAMS Consultants, Inc. and Gradient
Corporation, prepared for U.S. EPA, Region II, and
U.S. Army Corps of Engineers, Kansas City
District, April 1999.

Report: Hudson River PCBs Reassessment RI/FS,
Responsivesness Summary For Phase 2 Ecological
Risk Assessment, Scope of Work, Book 1 of 1,
prepared by TAMS Consultants, Inc. and Menzie-Cura
& Associates, Inc., prepared for U.S. EPA, Region
II, and U.S. Army Corps of Engineers, Kansas City
District, April 1999.

Report: Report on the Peer Review of the Data
Evaluation and Interpretation Report and Low
Resolution Sediment Coring Report for the Hudson
River PCBs Superfund Site, Final Report, prepared
by Eastern Research Group, Inc., prepared for the
U.S. EPA, Region II, June 3, 1999.

Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2E-Baseline
Ecological Risk Assessment, Hudson River PCBs
Reassessment RI/FS, Book 1 of 3, Text, prepared by
TAMS Consultants, Inc., and Menzie-Cura &
Associates, Inc., prepared for U.S. EPA, Region
II, and U.S. Army Corps of Engineers, Kansas City
District, August 1999.

P. 301541- Report: Phase 2 Report - Review Copy, Further Site
301847 Characterization and Analysis, Volume 2E-Baseline
Ecological Risk Assessment, Hudson River PCBs
Reassessment RI/FS, Book 2 of 3, Tables and
Figures, prepared by TAMS Consultants, Inc. and
Menzie-Cura & Associates, Inc., prepared for U.S.
EPA, Region II, and U.S. Army Corps of Engineers,
Kansas City District, August 1999.

P,

300797-
300954

p,

300955-
301070

P,

301071-
301273

P,

301274-
301540

16


-------
P. 301848- Report: Phase 2 Report - Review Copy, Further Site

	3 022 64	Characterization and Analysis, Volume 2E-Baseline

Ecological Risk Assessment, Hudson River PCBs
Reassessment RI/FS, Book 3 of 3, Appendices,
prepared by TAMS Consultants, Inc. and
Menzie-Cura & Associates, Inc., prepared for U.S.
EPA, Region II, and U.S. Army Corps of Engineers,
Kansas City District, August 1999.

Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2F-Human
Health Risk Assessment, Hudson River PCBs
Reassessment RI/FS, Book 1 of 1, Upper Hudson Risk
Assessment, prepared by TAMS Consultants, Inc.,
Gradient Corporation, prepared for U.S. EPA,

Region II, and U.S. Army Corps of Engineers,

Kansas City District, August 1999.

Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2E - A
Baseline Ecological Risk Assessment for Future
Risks in the Lower Hudson River, Hudson River PCBs
Reassessment RI/FS, Book 1 of 1, prepared by TAMS
Consultants, Inc. and Menzie-Cura & Associates,
Inc., prepared for U.S. EPA, Region II and U.S.
Army Corps of Engineers, Kansas City District,
December 1999.

Report: Phase 2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2F - A Human
Health Risk Assessment for the Mid-Hudson River,
Hudson River PCBs Reassessment RI/FS, Book 1 of 1,
prepared by TAMS Consultants, Inc. and Gradient
Corporation, prepared for U.S. EPA, Region II and
U.S. Army Corps of Engineers, Kansas City
District, December 1999.

P. 303177 - Report: Phase 2 Report - Review Copy, Further Site

	30 34 0 9 Characterization and Analysis, Volume 2D - Revised

Baseline Modeling Report, Hudson River PCBs
Reassessment RI/FS, Book 1 of 4, Fate and
Transport Models, prepared by TAMS Consultants,
Inc., Limno-Tech, Inc., Menzie-Cura & Associates,
Inc. and Tetra Tech, Inc., prepared for U.S. EPA,
Region II and U.S. Army Corps of Engineers, Kansas
City District, January 2000.

P. 302265-
302568

P. 302569 -
	303024

P. 303025 -
	303176

17


-------
p. 303410 - Report: Phase 2 Report - Review Copy, Further Site

	30 37 53 Characterization and Analysis, Volume 2D - Revised

Baseline Modeling Report, Hudson River PCBs
Reassessment RI/FS, Book 2 of 4 Fate and Transport
Models, prepared by TAMS Consultants, Inc., Limno-
Tech, Inc., Menzie-Cura & Associates, Inc. and
Tetra Tech, Inc., prepared for U.S. EPA, Region II
and U.S. Army Corps of Engineers, Kansas City
District, January 2000.

P. 303754 - Report: Phase 2 Report - Review Copy, Further

	3038 92 Site Characterization and Analysis, Volume 2D -

Revised Baseline Modeling Report, Hudson River
PCBs Reassessment RI/FS, Book 3 of 4,
Bioaccumulation Models, prepared by TAMS
Consultants, Inc., Limno-Tech, Inc., Menzie-Cura &
Associates, Inc. and Tetra Tech, Inc., prepared
for U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, January 2000.

P. 303893 - Report: Phase 2 Report - Review Copy, Further Site

	30 4 0 5 9 Characterization and Analysis, Volume 2D - Revised

Baseline Modeling Report, Hudson River PCBs
Reassessment RI/FS, Book 4 of 4, Bioaccumulation
Models, prepared by TAMS Consultants, Inc., Limno-
Tech, Inc., Menzie-Cura & Associates, Inc. and
Tetra Tech, Inc., prepared for U.S. EPA, Region II
and U.S. Army Corps of Engineers, Kansas City
District, January 2000.

Report: Hudson River PCBs Reassessment RI/FS
Responsiveness Summary for Volume 2E - Baseline
Ecological Risk Assessment, Book 1 of 1, prepared
by TAMS Consultants, Inc., Menzie-Cura &
Associates, Inc., prepared for U. S. EPA, Region
2, and U. S. Army Corps of Engineers, Kansas City
District, March 2000.

P. 304475 - Report: Hudson River PCBs Reassessment RI/FS

	30 4 8 89	Responsiveness Summary for Volume 2F - Human

	Health Risk Assessment, Book 1 of 1, Upper Hudson

Risk Assessment, prepared by TAMS Consultants,
Inc., Gradient Corporation, prepared for U. S.
EPA, Region 2, and U. S. Army Corps of Engineers,
Kansas City District, March 2000.

P. 304060 -
304474

18


-------
P. 304890- Report: Determination of Elements in Samples of

	304 968 Blood and Various Tissue Matrices from the Hudson

River, NY, Final Report FY0Q-32-Q5, prepared by
U.S. Department of the Interior, U.S. Geological
Survey, Biological Resources Division, prepared
for U.S. Fish and Wildlife Services, February 25,
2000 .

P. 304969- Letter to Ms. Anne Secord, U.S. Fish and Wildlife
305003 Service, from Carl E. Orazio, Ph.D., Leader,

Organic Chemistry Section, U.S. Department of the
Interior, U.S. Geological Survey, re: Eagle blood
congener-specific PCB report, July 7, 2000.
(Attachment: Report: Report #1, PCBs and PC
Pesticides in Bald Eagle Blood, FY-00-31-02, FWS
No: 1448-50181-99-H-007, CERC No: 3307-70L1D,
prepared by U.S. Department of the Interior, U.S.
Geological Survey, Organic Chemistry Section,
prepared for U.S. Fish and Wildlife Service and
New York Department of Environmental Conservation,
June 30, 2000 . )

P. 305004- Letter to Ms. Anne Secord, U.S. Fish and Wildlife
305030 Service, from Carl E. Orazio, Ph.D., Leader,

Organic Chemistry Section, U.S. Department of the
Interior, U.S. Geological Survey, re: PCDD/PCDF
report, July 11, 2000. (Attachment: Report: Final
Report, FY-99-31-01, FWS No: 14-48 50181-98-H-002,
CERC No: 82070-1491CL69, Orqanochlorine
Contaminants in Biota from the Hudson River, New
York, prepared by U.S. Department of the Interior,
U.S. Geological Survey, Organic Chemistry Section,
prepared for U.S. Fish and Wildlife Service, July
2000 . )

P. 305031 - Letter to Ms. Anne Secord, U.S. Fish and Wildlife
305048 Service, from Carl E. Orazio, Ph.D., Leader,

Organic Chemistry Section, U.S. Department of the
Interior, U.S. Geological Survey, re:
Organochlorine pesticide results for bald eagle
bloods, July 21, 2000. (Attachment: Report:
Report #1, PCBs and PC Pesticides in Bald Eagle
Blood, FY-00-31-02, FWS No: 1448-50181-99-H-007,
CERC No: 3307-70L1D, prepared by U.S. Department
of the Interior, U.S. Geological Survey, Prganic
Chemistry Section, prepared for U.S. Fish and

19


-------
Wildlife Service and New York Department of
Environmental Conservation, July 20, 2000.)

P. 305049 - Report: Hudson River PCBs Reassessment RI/FS,

	30 533 8 Responsiveness Summary for Volume 2E-A Baseline

Ecological Risk Assessment for Future Risks in the
Lower Hudson River, Book 1 of 1, prepared by TAMS
Consultants, Inc. and Menzie-Cura & Associates,
Inc., prepared for U.S. EPA Region II, and U.S.
Army Corps of Engineers, Kansas City District,
August 2000.

P. 305339 - Report: Hudson River PCBs Reassessment RI/FS,

	3 0 55 93 Responsiveness Summary for Volume 2F-A Human

Health Risk Assessment for the Mid-Hudson River,
Book 1 of 1, prepared by TAMS Consultants, Inc.,
and Gradient Corporation, prepared for U.S. EPA,
Region II, and U.S. Army Corps of Engineers,

Kansas City District, August 2000.

P. 305594 - Letter to Ms. Anne Secord, U.S. Fish and Wildlife
305645 Service, from Carl E. Orazio, Ph.D., Leader,

Organic Chemistry Section, U.S. Department of the
Interior, U.S. Geological Survey, re: Report #2
entitled "PCBs and OC Pesticides in Great Blue
Heron Brain Tissue and Tree Swallow Nestlings and
Adults", September 6, 2000. (Attachment: Report:
Report #2, PCBs and OC Pesticides in Great Blue
Heron Brain Tissue and Tree Swallow Nestlings and
Adults, FY-00-31-02, FWS No: 1448-50181-99-H-007,
CERC No.: 3307-70L1D, prepared by U.S. Department
of the Interior, U.S. Geological Survey, Organic
Chemistry Section, prepared for U.S. Fish and
Wildlife Service, September 6, 2000.)

P. 305646 - Letter to Ms. Anne Secord, U.S. Fish and Wildlife
305681 Service, from Carl E. Orazio, Leader, Organic
Chemistry Section, U.S. Department of the
Interior, U.S. Geological Survey, re: Report for
Set #1: Dioxins, Furans and Non-ortho-PCBs in bald
eagle bloods, September 14, 2000. (Attachment:
Report: Report for Set #1, Dioxins, Furans, and
Non-ortho-PCBs in Bald Eagle Bloods, FY-00-31-02,
FWS No: 1448-50181-99-H-007, CERC No: 3307-70L1D,
prepared by U.S. Department of the Interior, U.S.
Geological Survey, Organic Chemistry Section,
prepared for U.S. Fish and Wildlife Service,
September 15, 2000.)

20


-------
Letter (w/attachments) to Ms. Alison Hess, C.P.G.,
Project Manager, U.S. EPA, Region II, and Mr. John
Haggard, General Electric Company, from Mr. David
A. Stilwell, Field Supervisor, U.S. Department of
the Interior, Fish and Wildlife Service, re: Data
from samples collected along the Hudson River
between 1995 and 1998 by the U.S. Fish and
Wildlife Service and New York State Department of
Environmental Conservation, September 20, 2000.

Compact Disk: (1) Report of the Hudson River PCBs
Site Modeling Approach Peer Review, Final Report,
prepared by Eastern Research Group, Inc., prepared
for U. S. EPA, Region II, November 10, 1998; (2)
Report on the Peer Review of the Data Evaluation
and Interpretation Report and Low Resolution
Sediment Coring Report for the Hudson River PCBs
Superfund Site, prepared by Eastern Research
Group, Inc., prepared for U. S. EPA, Region II,
June 3, 1999; (3) Report on the Peer Review of the
Revised Baseline Modeling Report for the Hudson
River PCBs Superfund Site, Final Report, prepared
by Eastern Research Group, Inc., prepared for U.S.
EPA, Region II, May 10, 2000; (4) Report on the
Peer Review of the Ecological Risk Assessment for
the Hudson River PCBs Superfund Site, Final
Report, prepared by Eastern Research Group, Inc.,
prepared for U.S. EPA, Region II, August 18, 2000;
(5) Report on the Peer Review of the Hudson River
PCBs Human Health Risk Assessment, Final Report,
prepared by Eastern Research Group, Inc., prepared
for U.S. EPA, Region II, September 2000.

Compact Disk: Database for the Hudson River PCBs
Reassessment RI/FS, Release 5.0, prepared by TAMS
Consultants, Inc., prepared for U. S. EPA, Region
II, October 2000.

P. 305690 - Letter to Ms. Anne Secord, U.S. Fish and Wildlife
305731 Service, from Carl E. Orazio, Leader, Organic
Chemistry Section, U.S. Department of the
Interior, U.S. Geological Survey, re: Report for
congener specific PCBs, organochlorine pesticides,
non-ortho-PCBs and PCDD/PCDFs in eagle eggs,
October 25, 2000. (Attachment: Report: Report #4,
Organochlorine Contaminants in Bald Eagle Eggs,
FY-00-31-04, FWS No: 1448-50181-99-H-007 , CERC No:
3307-7 0L1D, prepared by U.S. Department of the

P.

305682
305687

P.

305688
305688

P. 305689 -
	305689

21


-------
Interior, U.S. Geological Survey, Organic
Chemistry Section, prepared for U.S. Wildlife
Service, and New York State Department of
Environmental Conservation, October 24, 2000.)

P. 305732 - Report: Hudson River PCBs Reassessment RI/FS,

	3 0 5789 Response to Peer Review Comments on the Human

Health Risk Assessment, Book 1 of 1, prepared by
TAMS Consultants, Inc., and Gradient Corporation,
prepared for U.S. EPA, Region II, and U.S. Army
Corps of Engineers, Kansas City District, November
2000 .

P. 305790 -
	305872

by TAMS Consultants, Inc., and Menzie-Cura &
Associates, Inc., prepared for U.S. EPA, Region
II, and U.S. Army Corps of Engineers, Kansas City
District, November 2000.

Report: Hudson River PCBs Reassessment RI/FS,
Response to Peer Review Comments on the Baseline
Ecological Risk Assessment, Book 1 of 1, prepared

P. 305873 - Report: Phase 2 Report, Further Site

	30 618 6 Characterization and Analysis, Volume 2E - Revised

	Baseline Ecological Risk Assessment, Hudson River

PCBs Reassessment RI/FS, Book 1 of 2, Text,
prepared by TAMS Consultants, Inc., and Menzie-
Cura & Associates, Inc., prepared for U.S. EPA,
Region II, and U.S. Army Corps of Engineers,

Kansas City District, November 2000.

P. 306187 - Report: Phase 2 Report, Further Site

	3 0 6560 Characterization and Analysis, Volume 2E - Revised

Baseline Ecological Risk Assessment, Hudson River
PCBs Reassessment RI/FS, Book 2 of 2, Tables,
Figures and Plates, prepared by TAMS Consultants,
Inc., and Menzie-Cura & Associates, Inc., prepared
for U.S. EPA, Region II, and U.S. Army Corps of
Engineers, Kansas City District, November 2000.

P. 306561 - Report: Phase 2 Report, Further Site

	30 712 3 Characterization and Analysis, Volume 2F - Revised

Human Health Risk Assessment, Hudson River PCBs
Reassessment RI/FS, Book 1 of 1, Upper Hudson
River, Mid-Hudson River, prepared by TAMS
Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA, Region II and U.S. Army
Corps of Engineers, Kansas City District, November
2000 .

22


-------
P. 307124 - Report: Hudson River PCBs Reassessment RI/FS,

	30 72 7 7 Response to Peer Review Comments on the Revised

Baseline Modeling Report, prepared by TAMS
Consultants, Inc., Limno-Tech, Inc., Menzie-Cura &
Associates, Inc., and TetraTech, Inc., prepared
for U.S. EPA, Region II, and U.S. Army Corps of
Engineers, Kansas City District, November 2000.

P. 307278 - Report: Hudson River PCBs Reassessment RI/FS,

	30 7 3 90 Response to Peer Review Comments on the Data

Evaluation and Interpretation Report (DEIR) and
the Low Resolution Sediment Coring Report (LRC),
prepared by TAMS Consultants, Inc., and TetraTech,
Inc., prepared for U.S. EPA, Region II, November
2000 .

P. 312391 - Report: Draft Status Report, Temporal Water Column

	312455 Monitoring Program, Hudson River Project, prepared

by O'Brien & Gere Engineers, Inc., prepared for
General Electric Company Corporate Environmental
Programs, October 2, 1991.

P. 312456 - Report: General Electric Hudson River

	312474 Investigation, March 4, 1992.

P. 312475 - Letter to Mr. Douglas Tomchuk, Remedial Project
312511 Manager, U.S. EPA, Region II, from C. Kirk

Ziegler, Ph.D., HydroQual, Inc., re: Non-cohesive
sediment modeling report, June 9, 1997.

(Attachment: Report: Modeling Suspended Load
Transport of Non-Cohesive Sediments in the Upper
Hudson River, prepared by HydroQual, Inc.,
prepared for General Electric Company, June 1997.)

P. 312512 - Memorandum to Mr. Melvin Schweiger, Project

312523 Manager, General Electric Company, from J. Rhea,

HydroQual, Inc., re: TID Monitoring, September 30,
1997 .

P. 312524 - Memorandum to Mr. John Haggard, Engineering

312541A Project Manager, Hudson River Project, General

Electric Company and Mr. Melvin Schweiger, Project
Manager, General Electric Company, from J. Rhea,
HydroQual, Inc., re: TIP Time of Travel Surveys,
October 6, 1997. (Attachments: (1) Memorandum to
File, from Mr. Mark LaRue, O'Brien & Gere
Engineers, Inc., re: Hudson River Hydrologic
Profiles, September 11, 1997; (2) Blueprints from

23


-------
O'Brien & Gere Engineers, Inc., September 9, 1997
and September 8, 1997.)

P. 312542 - Report: Results of the General Electric 1996-97

	312564 Thompson Island Pool Research Program, prepared by

HydroQual, Inc., October 8, 1997.

P. 312565 - Report: Summary of the Results of General Electric

	312 57 0 Co.' s 1996 - 1997 Upper Hudson River/Thompson

Island Pool Research Program, prepared by General
Electric Company, prepared for the NYSDEC/USEPA
Meeting, October 16, 1997.

P. 312571 - Report: Analysis of Hudson River PCB Sources Based

	312611 on Interpretation of Data, prepared by HydroQual,

Inc., prepared for General Electric Company,
prepared for the NYSDEC/USEPA Meeting, October 16,
1997 .

P. 312612 - Letter to Mr. Douglas Tomchuk, Remedial Project
312656 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Engineering Project Manager, Hudson River
Project, General Electric Company, re: Groundwater
Flux - Thompson Island Pool, October 22, 1997.
(Attachment: Report: Investigation of Groundwater
Seepage in the Upper Hudson River, prepared by HSI
Geotrans, prepared for General Electric Company,
October 16, 1997.)

P. 312657 - Report: Results of the General Electric 1996-97

	312689 Thompson Island Pool Research Program, prepared by

HydroQual, Inc., prepared for the NYSDEC/USEPA
Meeting, October 16, 1997, Revised December 2,
1997, prepared for General Electric Company.

P. 312690 - Report: Strategy for Completion of the Hudson

	3127 0 9 River RRI/FS: Central Role of Quantitative

Modeling, prepared for GE/USEPA Meeting, December
2, 1997, prepared by HydroQual, Inc., prepared for
General Electric Company.

P. 312710 - Report: Final Report, Thompson Island Pool

	312843 Sediment PCB Sources, prepared by Quantitative

Environmental Analysis, LLC., prepared for General
Electric Company, Corporate Environmental
Programs, March 19, 1998.

24


-------
P. 312844 - Report: Data Documentation and Interpretation

	312 95 6 Report, Submerged Aquatic Vegetation and Fish

Community Analysis, prepared by Exponent, prepared
for General Electric Company, April 1998.

P. 312957 - Report: Volume I, Data Report, Macroinvertebrate

	313 016 Communities and Diets of Selected Fish Species in

the Upper Hudson River, prepared by Exponent,
prepared for General Electric Company, May 1998.

P. 313017 - Report: Volume II, Tables, Data Report,

	313316 Macroinvertebrate Communities and Diets of

Selected Fish Species in the Upper Hudson River,
prepared by Exponent, prepared for General
Electric Company, May 1998.

P. 313317 - Report: Preliminary Model Calibration Report,

	313335 Revised Appendix B, Mathematical Modeling of PCB

Fate and Transport for Hudson River PCB
Reassessment RI/FS, Current Modeling WorkPlan,
prepared by Limno-Tech, Inc. and Menzie-Cura &
Associates, Inc., and Tetra Tech, Inc., prepared
for TAMS Consultants, Inc., July 1998.

P. 313336 - Report: Macroinvertebrate Communities and Diets of

	3134 5 8 Selected Fish Species in the Upper Hudson River,

Spring 1998: Data Report, prepared by Exponent,
prepared for General Electric Company, October
1998 .

P. 313459 - Report: PCBs in the Upper Hudson River, Volume 1,

	313 617 Historical Perspective and Model Overview,

prepared by Quantitative Environmental Analysis,
LLC., prepared for General Electric Company, May
1999.

P. 313618 - Report: PCBs in the Upper Hudson River, Volume 2,

	3142 35 A Model of PCB, Fate, Transport, and

Bioaccumulation, prepared by Quantitative
Environmental Analysis, LLC., prepared for General
Electric Company, May 1999.

P. 314236 - Report: PCBs in the Upper Hudson River, Volume 3,

	314 314 Predictions of Natural Recovery and the

Effectiveness of Active Remediation, prepared by
Quantitative Environmental Analysis, LLC.,
prepared for General Electric Company, May 1999,
amended July 1999.

25


-------
P. 314315 - Report: PCBs in the Upper Hudson River, Executive

	314385 Summary, prepared by Quantitative Environmental

Analysis, LLC., prepared for General Electric
Company, May 1999, amended, July 1999.

P. 314386 - Report: PCBs in the Upper Hudson River, Errata,
314414 prepared by Quantitative Environmental Analysis,
LLC., prepared for General Electric Company, July
1999.

P. 314415 - Report: 1999 Sediment Sampling Program, Technical

	314455 Memorandum, prepared by Quantitative Environmental

Analysis, LLC., prepared for General Electric
Company, July 1999.

P. 314456 - Report: Summary Reviews of Select Aspects of the

	314485 USEPA Upper Hudson River Models, prepared by

Quantitative Environmental Analysis, LLC, prepared
for USEPA Baseline Modeling Report Peer Review
Members, March 27, 2000.

P. 316450 - Report: Hudson River PCB Contamination - A 1985

316474 Perspective, prepared by Mark P. Brown and Ronald
J. Sloan, New York State Department of
Environmental Conservation, and Charles R. Barnes,
United States Geological Survey, presented at the
58th Annual Meeting of the NY Water Pollution
Association, January 14, 1986, NYC.

P. 316475 - Report: Distribution of PCBs in the Thompson

316574 Island Pool of the Hudson River, Final Report of
the Hudson River PCB Reclamation Demonstration
Project Sediment Survey, prepared by Mr. Mark P.
Brown, Ms. Mary B. Werner, Ms. Cynthia R.

Carusone, and Mr. Michael Klein, Bureau of
Technical Services and Research, Division of
Water, New York State Department of Environmental
Conservation, May 1988.

P. 316575 - Report: Remedial Technology Review For Hudson
316667 River Remnant Deposits, prepared by Applied
Environmental Management, Inc., prepared for
General Electric Company, GE Corporate
Environmental Programs, December 1992.

P. 316668 - Report: Analysis of Side-scan Sonar, Bathvmetric
316744 Subbottom and Sediment Data from the Upper Hudson
River Between Bakers Falls and Lock 5, Hudson

26


-------
River PCB Reassessment RI/FS, prepared by Roger D.
Flood, Associate Professor, Marine Sciences
Research Center, State University of New York
Stony Brook, prepared for TAMS Consultants, Inc.,
September 1993.

P. 316745 - Report: Critical Issues Regarding the

316770 Bioaccumulation of PCBs from the Water Column and

	Sediment of the Upper Hudson River, prepared by

HydroQual, Inc., prepared for General Electric
Company, October 31, 1995.

P. 316771 - Report: The Erosion Properties of Cohesive

316816 Sediments in the Upper Hudson River, prepared by
HydroQual, Inc., prepared for General Electric
Company, October 31, 1995.

P. 316817 - Report: Quantification of Sedimentation in the

316857 Upper Hudson River, prepared by HydroQual, Inc.,

prepared for General Electric Company, October 31,
1995.

P. 316858 - Report: Anomalous PCB Load Associated with the
316889 Thompson Island Pool: Possible Explanations and

	Suggested Research, prepared by HydroQual, Inc.,

prepared for General Electric Company, October 31,
1995.

P. 317770 - Report: Toxicants in Snapping Turtles, prepared by
317782 Mr. Ward B. Stone, Associate Wildlife Pathologist,
New York State Department of Environmental
Conservation, Mr. Eric Kiviat, Research Associate
in Ecology, Bard College, and Mr. Stanley A.
Butkas, Histology Technician, New York State
Department of Environmental Conservation, prepared
for New York Fish and Game Journal, 1980.

P. 317783 - Letter to Chief, Response and Prevention Branch,
317817 U.S. EPA, Region II, from Mr. M. Peter Lanahan,
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Continuous Release
Report (CR-ERNS # 140381) Annual Update, December
8, 1993. (Attachment: Report: Hudson River
Project Continuous Release Report Addendum II,
prepared by O'Brien & Gere Engineers, Inc.,
prepared for General Electric Company Corporate
Environmental Programs, December, 1993.)

27


-------
P. 317818 - Report: A Brief Report on PCB in Hudson River

317885 Striped Bass, prepared by Ronald Sloan, Division

of Fish and Wildlife, New York State Department of
Environmental Conservation, July 1994.

P. 317886 - Letter to Chief, Response and Prevention Branch,
317888 U.S. EPA, Region II, from Mr. M. Peter Lanahan,
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Continuous Release
Report - Emergency Response Notification System
(CR-ERNS) Number 140381 Notification of Change in
Information, July 22, 1994.

P. 317889 - Report: PCB Levels in Fish from the Upper Hudson
317900 River, prepared by Division of Environmental

Health Assessment, New York State Department of
Health, July 1995.

P. 317901 - Memorandum to distribution, from Mr. Frank D.
317911 Estabrooks, New York State Department of

Environmental Conservation, re: Heavy Metals in
Hudson River Sediment Cores, July 17, 1995.

P. 317912 - Report: PCB Paradigms for Striped Bass in New

318030 York State prepared by Mr. Ronald Sloan, Bureau of
Environmental Protection, Division of Fish and
Wildlife, New York State Department of
Environmental Conservation, Mr. Byron Young
Division of Marine Resources, New York State
Department of Environmental Conservation, Ms.

Kathy Hattala, Hudson River Fisheries Unit, Bureau
of Fisheries, Region 3, New York State Department
of Environmental Conservation, October, 1995.

P. 318031 - Report: GC/HRMS Analyses of Non-Qrtho-Chloro-

318041 Substituted Polvchlorinated Biphenvls in Ducks and
Tree Swallows, Tree Swallow Eggs, and Insects from
the Hudson River Area, prepared by Paul H.
Peterman, Chemist, GC/MS, National Biological
Service, U.S. Department of the Interior, prepared
for Ms. Anne Secord, U.S. Fish and Wildlife
Service, September 20, 1996.

P. 318042 - Report: Polvchlorinated Biphenvl Contamination of
318044 Tree Swallows in the Upper Hudson River Valley,
New York, Effects on Breeding Biology And
Implications for Other Bird Species, prepared by
Ms. Anne L. Secord, New York Field Office, U.S.

28


-------
Fish and Wildlife Service, and Dr. John P.

McCarty, New York Field Office, U.S. Fish and
Wildlife Service, March, 1997.

P. 318045 - Letter to Mr. Ronald Sloan, New York State

318046 Department of Environmental Conservation and Mr.

Douglas J. Tomchuk, U.S. EPA, Region II, from Mr.
John G. Haggard, Engineering Project Manager, GE
Corporate Environmental Programs, General Electric
Company, re: Ecological Field Study - Ecological
Value and Food Web Structure of the Aquatic
Vegetation Communities of the Upper Hudson River,
August 13, 1997.

P. 318047 - Report: Nest - Building Behavior in PCB -

318055 Contaminated Tree Swallows, prepared by Dr. John
P. McCarty, Section of Ecology and Systematics,
Cornell University and Ms. Anne L. Secord, New
York Field Office, U.S. Fish and Wildlife Service,
prepared for The Auk, January, 1999.

P. 318056 - Letter to Mr. James Colquhoun, from Ronald Sloan,
318087 Ph.D., Research Scientist, New York State

Department of Environmental Conservation re:
Briefing on 1997 Striped Bass PCB Results,

February 11, 1999.

P. 318088 - Report: Phase 2 Report - Review Copy, Further Site

	318219 Characterization and Analysis, Volume 2D -

Baseline Modeling Report, Hudson River PCBs
Reassessment RI/FS, Book 1 of 4, Fate and
Transport Models, prepared by Limno-Tech, Inc.,
Menzie-Cura & Associates, Inc., and Tetra Tech,
Inc., prepared for U.S. EPA, Region II and U.S.
Army Corps of Engineers, Kansas City District, May
1999.

P. 318220 - Report: Phase 2 Report - Review Copy, Further Site

	318 35 0 Characterization and Analysis, Volume 2D -

Baseline Modeling Report, Hudson River PCBs
Reassessment RI/FS, Book 2 of 4, Fate and
Transport Models, prepared by Limno-Tech, Inc.,
Menzie-Cura & Associates, Inc., and Tetra Tech,
Inc., prepared for U.S. EPA, Region II and U.S.
Army Corps of Engineers, Kansas City District, May
1999.

29


-------
P. 318351 - Report: Phase 2 Report - Review Copy, Further Site

	318 4 7 5 Characterization and Analysis, Volume 2D -

Baseline Modeling Report, Hudson River PCBs
Reassessment RI/FS, Book 3 of 4, Bioaccumulation
Models, prepared by Limno-Tech, Inc., Menzie-Cura
& Associates, Inc., and Tetra Tech, Inc., prepared
for U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, May 1999.

P. 318476 - Report: Phase 2 Report - Review Copy, Further Site

	318 62 6 Characterization and Analysis, Volume 2D -

Baseline Modeling Report, Hudson River PCBs
Reassessment RI/FS, Book 4 of 4, Bioaccumulation
Models, prepared by Limno-Tech, Inc., Menzie-Cura
& Associates, Inc., and Tetra Tech, Inc., prepared
for U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, May 1999.

P. 321422 - Report: Hudson River PCB DNAPL Transport Study,

	321523 Project No.GECQ0500, prepared by HydroQual, Inc.,

prepared for General Electric Company, Albany, New
York, June 1997.

P. 321524 - Compact Disk: Hudson River PCBs Site, Reassessment

	32152 4 RI/FS, National Remedy Review Board, Remedy

Selection Briefing Package, Volume 1 of 2, Text,
and Volume 2 of 2, Tables and Figures, prepared by
U.S. EPA, Region II, November 15, 2000.

P. 321525 - Letter to Douglas Fischer, Esq., Assistant

321525	Regional Counsel, Office of Regional Counsel, U.S.
EPA, Region II, from Mr. Brian G. Donohue, Senior
Attorney, U.S. Department of

Justice, Environment and Natural Resources
Division, re: Federal Trustee Submission to
National Remedy Review Board, December 1, 2000.

P. 321526 - Memorandum to Ms. Jennie Delcimento,

321526	Administrative Record Coordinator, Emergency and
Remedial Response Division, from Mr. Douglas
Fischer, Attorney, Office of Regional Counsel,
U.S. EPA, Region II, re: November 15, 2000 Hudson
River PCBs Site Reassessment RI/FS National Remedy
Review Board Remedy Selection Briefing Package,
December 8, 2000.)

30


-------
P. 321527 - Report: Tests of Bioaccumulation Models for PCBs:

	3215 68 "A Study of Younq-of-the-Year Bluefish in the

Hudson River Estuar/f , A Report of the 1993 Polqar
Fellowship Program, prepared by Mr. Lawrence A.
LeBlanc, Polgar Fellow, Marine Sciences Research
Center, The University at Stony Brook, undated.

P. 321576 - Report: Data Report for Task II of Study of PCB in
321619 New York/New Jersey, Point Sources, prepared by
Battelle Ocean Sciences, prepared for U.S. EPA,
Office of Wetlands, Oceans, and Watersheds,

January 29, 1993.

P. 321620 - Memorandum to Distribution, from Mr. Frank D.
321630 Estabrooks, New York State Department of

Environmental Conservation, re: Heavy Metals in
Hudson River Sediment Cores, July 17, 1995.

P. 321631 - Letter to Mr. Douglas Tomchuk, Remedial Project
321955 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Engineering Project Manager, General
Electric Company, re: Remnant Deposits Monitoring
Program-1996, March 31, 1998. (Attachment: Final
Report: Final Report, Fort Edward Dam PCB Remnant
Containment, 1996 Post-Construction Remnant
Deposit Monitoring Program, prepared by O'Brien &
Gere Engineers, Inc., prepared for General
Electric Company, March 1998.)

P. 321956 - Letter to Mr. Adam Ayers, Project Scientist,

321985 General Electric Company, from Ms. Alison A. Hess,
C.P.G., Project Manager, U.S. EPA, Region II, re:
Hudson River PCBs Superfund Site, August 29, 2000.

(Attachments: FAX (w/attachment) to Ms. Helen
Chernoff and Mr. Mark Moese, TAMS Consultants,
from D. T. Mayack of New York Department of
Environmental Conservation, re: Data on Hudson
River Waterfowl, Mink, and Otter, 9/13/99.

P. 321986 - Report: Hudson River PCBs Reassessment RI/FS

322278 Responsiveness Summary for Volume 2D - Baseline
Modeling Report, Book 1 of 1, prepared by TAMS
Consultants, Inc., Limno-Tech, Inc., Menzie-Cura &
Associates, Inc., TetraTech, Inc., prepared for
U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, February 2000.

31


-------
P. 32227 9 - Report: Phase 2 Report Further Site

322357 Characterization and Analysis, Response to Peer
Review Comments on the Preliminary Model
Calibration Report, Hudson River PCBs Reassessment
RI/FS, prepared by TAMS Consultants, Inc., Limno-
Tech, Inc., Menzie Cura & Associates, Inc.,
TetraTech, Inc., prepared for U.S. EPA, Region II
and U.S. Army Corps of Engineers, Kansas City
District, February 2000.

P. 322358 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
322565 Manager, U.S. EPA, Region II, from Mr. Robert G.

Gibson, Engineering Project Manager, General
Electric Company, re: Hudson River Monitoring
Program, 1999 Summary Report, January 24, 2001.
(Attachment: Report: Final Hudson River Monitoring
Program, 1999 Summary Report, prepared by
Quantitative Environmental Analysis, LLC.,
prepared for General Electric Company, January
2001. )

P. 322897 - Memorandum to Mr. Ed Garvey, Mr. A1 DiBernardo,
322899 TAMS/NJ, and Mr. Vic Bierman, Mr. Mike Erickson,
LTI, from Mr. J.B. Butcher, Tetra Tech, Inc., re:
Historic Sediment PCB Data Conversions, June 9,
1998 .

P. 322900 - Facsimile to Mr. Bruce Fidler, TAMS Consultants,
322901 from Ms. Katherine von Stackelberg, Menzie-Cura &
Associates, Inc., re: Target Fish Levels for
Hudson River Based on Ecological Receptors -
Draft, November 11, 1999.

P. 322902 - Memorandum to Hudson River Team, from Ms. Trina
322903 van Stackelberg, Menzie-Cura & Associates, Inc.,
re: Background Concentrations for Fish at River
Miles 201-216, December 14, 1999.

P. 322927 - Report: Final Laboratory Report FY-95-30-41,

	32 3 02 7 GC/HRMS Analyses of 2,3,7,8-Substituted

Polvchlorinated Dibenzo-p-dioxins and
Dibenzofurans in Tree Swallow Chicks from Upper
Hudson River, NY, prepared by U.S. Department of
the Interior, National Biological Service,
prepared for U.S. Fish and Wildlife Service, June
28, 1995. (Attachment: Report: Final Laboratory
Report FY-95-30-37, GC/HRMS Analyses of Non-ortho-
Chloro-Substituted Polvchlorinated Biphenvls in

32


-------
Tree Swallow Chicks from the Upper Hudson River,
prepared by U.S. Department of the Interior,
National Biological Service, prepared for U.S.

Fish & Wildlife Service, May 22, 1995.)

Peer Review of Hudson River PCBs Reassessment Reports -

Preliminary Model Calibration Report

P. 307391 - Memorandum to Potential Peer Reviewer from Ms.

307395	Arlene Levin and Mr. Tom DeCoff, Eastern Research
Group, Inc., re: Peer Review of Hudson River PCBs
Reassessment Reports, undated.

P. 307396 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,

307396	from Ms. Arlene Levin, Vice President, Eastern
Research Group, Inc., re: contract No. 68-W6-0022,
Work Assignment No. 3-12, June 29, 1998.

P. 307397 - Peer Review of Hudson River PCBs RI/FS Phase 2

307412	Reports, Preliminary Model Calibration Report

Package.

P. 307413 - Hudson River PCBs Site, Modeling Approach Peer

307415	Review, Sheraton Saratoga Springs Hotel and

Conference Center, Saratoga Springs, NY, September
9-10, 1998, Revised Charge to Reviewers.

P. 307416 - Hudson River PCBs Site, Modeling Approach Peer

307417	Review, Sheraton Saratoga Springs Hotel and
Conference Center, Saratoga Springs, NY, September
9-10, 1998, Agenda.

P. 307418 - Hudson River PCBs Site, Modeling Approach Peer

307418	Review, Sheraton Saratoga Springs Hotel and
Conference Center, Saratoga Springs, NY, September
9-10, 1998, Peer Reviewers.

P. 307419 - Hudson River PCBs Site, Modeling Approach Peer

307497	Review, Premeeting Comments, Saratoga Springs, NY,

September 9-10, 1998, prepared by Eastern Research
Group, Inc.

Peer Review of Hudson River PCBs Reassessment Reports - Data

Evaluation and Interpretation Report and Low Resolution Sediment

Coring Report

33


-------
7498

7498

7499

7503

7504

7504

7505

7517

7518

7520

7521

7521

7522

7523

7524

7633

Compact Disk: Database for the Hudson River PCBs
Reassessment RI/FS, Release 4.1, prepared by TAMS
Consultants, Inc., prepared for U.S. EPA, Region
II, August, 1998.

Memorandum to Potential Peer Reviewer from Mr.
Tom DeCoff, Eastern Research Group, Inc., re: Peer
Review of Hudson River PCBs Reassessment Reports,
undated.

Letter to Mr. Damien Hughes, U.S. EPA, Region II,
from Ms. Arlene Levin, Vice President, Eastern
Research Group, Inc., re: Contract No. 68-W6-0022,
Work Assignment No. 3-12, January 5, 1999.

Letter (with attachments) from Ms. Kate Schalk,
Conference Manager, Eastern Research Group, Inc.,
re: Confirmation of participation as a peer
reviewer for the upcoming U.S. EPA's "Peer Review
of Hudson River PCBs Reassessment, RI/FS Phase 2
Reports, Volume 2C - Data Evaluation and
Interpretation Report and Volume 2C-A Low
Resolution Sediment Coring Report", January 8,
1999.

Peer Review of Hudson River PCBs Reassessment
RI/FS Phase 2 Reports, Data Evaluation and
Interpretation Report and Low Resolution Sediment
Coring Report, Albany Marriott, Albany, New York,
March 16-18, 1999, Agenda.

Peer Review of Hudson River PCBs Reassessment
RI/FS Phase 2 Reports, Data Evaluation and
Interpretation Report and Low Resolution Sediment
Coring Report, Albany Marriott, Albany, New York,
March 16-18, 1999, Peer Reviewers.

Peer Review of Hudson River PCBs Reassessment
RI/FS Phase 2 Reports, Data Evaluation and
Interpretation Report and Low Resolution Sediment
Coring Report, Albany Marriott, Albany, New York,
March 16-18, 1999, Logistical Fact Sheet.

Peer Review of Hudson River PCBs Reassessment
RI/FS Phase 2 Reports, Data Evaluation and
Interpretation Report and Low Resolution Sediment
Coring Report, Premeeting Comments, Albany, New
York, March 16-18, 1999.

34


-------
Peer Review of Hudson River PCBs Reassessment Reports - Baseline

Modeling Report

P. 307 634 - Memorandum to Potential Peer Reviewer from Mr.

307638	Tom DeCoff, Eastern Research Group, Inc., re: Peer

Review of Hudson River PCBs Reassessment Reports,
undated.

P. 307639 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,
307640	from Ms. Arlene Levin, Vice President, Eastern

Research Group, Inc. re: Contract No. 68-W6-0022,
Work Assignment No. 4-12, December 17, 1999.

P. 307641 - Letter (with attachments) from Ms. Kate Schalk,
307655	Conference Manager, re: Confirmation of

participation as a reviewer for the upcoming U.S.
EPA's "Peer Review of Hudson River PCBs
Reassessment, Baseline Modeling Report", December
7, 1999.

P. 307 656 - Peer Review of Hudson River PCBs Reassessment

307657	RI/FS Phase 2 Reports, Revised Baseline Modeling
Report, Sheraton Saratoga Springs, Saratoga
Springs, New York, March 27-28, 2000, Agenda.

P. 307 658 - Peer Review of Hudson River PCBs Reassessment

307658	RI/FS Phase 2 Reports, Revised Baseline Modeling
Report, Sheraton Saratoga Springs, Saratoga
Springs, New York, March 27-28, 2000, List of
Reviewers.

P. 307 659 - Peer Review of Hudson River PCBs Reassessment
307660	RI/FS Phase 2 Reports, Revised Baseline Modeling

Report, Sheraton Saratoga Springs, Saratoga
Springs, New York, March 27-28, 2000, Logistical
Fact Sheet.

P. 307 661 - Memorandum to Mr. Robert Nairn from Ms. Lauren
307666	Lariviere, Eastern Research Group, Inc., re: PCB

Review Information, March 21, 2000.

P. 307667 - Letter (with attachments) to Reviewers from Ms.
307870	Melanie Russo, Eastern Research Group, Inc., re:

Recap of what was presented at the Informational
Meeting for the Peer Review of Hudson River PCBs
Baseline Modeling Report, February 15, 2000.

35


-------
P. 307871 - Peer Review of Hudson River PCBs Reassessment
307999	RI/FS Phase 2 Reports, Baseline Modeling Report,

Premeeting Comments, Saratoga Springs, New York,
March 27-28, 2000.

P. 308000 - Summary Reviews of Select Aspects of the USEPA
308046	Upper Hudson River Models, Presented to the USEPA

Baseline Modeling Report Peer Review Members,
March, 27, 2000, prepared by Quantitative
Environmental Analysis, LLC.

Peer Review of Hudson River PCBs Reassessment Reports - Human

Health Risk Assessment

P. 308047 - Memorandum to Potential Peer Reviewer from Mr.

308051	Tom DeCoff, Eastern Research Group, Inc., re: Peer

Review of Hudson River PCBs Reassessment Reports,
undated.

P. 308052 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,
308053	from Ms. Arlene Levin, Vice President, Eastern

Research Group, Inc. re: Contract No. 68-W6-0022,
Work Assignment No. 4-12, March 20, 2000.

P. 308054 - Letter (with attachments) from Ms. Kate Schalk,
308062	Conference Manager, re: Confirmation of

participation as a reviewer for the upcoming U.S.
EPA's "Peer Review of Hudson River PCBs
Reassessment, Human Health Risk Assessment
Report", March 17, 2000.

P. 308063 - Letter (with attachments) to Reviewers from Ms.
308263	Melanie Russo, Eastern Research Group, Inc., re:

Recap of what was presented at the Informational
Meeting for the Peer Review of Hudson River PCBs
Ecological & Human Health Risk Assessment, April
5, 2000.

P. 308264 - Peer Review of Hudson River PCBs Reassessment

308265	RI/FS Phase 2 Reports, Human Health Risk
Assessment, Holiday Inn, Saratoga Springs, New
York, May 30-31, 2000, Agenda.

P. 308266 - Peer Review of Hudson River PCBs Reassessment

308266	RI/FS Phase 2 Reports, Human Health Risk
Assessment, Holiday Inn, Saratoga Springs, New
York, May 30-31, 2000, List of Reviewers.

36


-------
P. 308267 - Peer Review of Hudson River PCBs Ecological &
308268	Human Health Risk Assessment, Holiday Inn,

Saratoga Springs, New York, May 30-June 2, 2000,
Logistical Fact Sheet.

P. 308269 - Peer Review of the Hudson River PCBs Human Health
308507	& Ecological Risk Assessments, Premeeting

Comments, Saratoga Springs, New York, May 30-June
2, 2000.

Peer Review of Hudson River PCBs Reassessment Reports -

Ecological Risk Assessment

P. 308508 - Memorandum to Potential Peer Reviewer from Mr.

308512	Tom DeCoff, Eastern Research Group, Inc., re: Peer

Review of Hudson River PCBs Reassessment Reports,
undated.

P. 308513 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,
308514	from Ms. Arlene Levin, Vice President, Eastern

Research Group, Inc. re: Contract No. 68-W6-0022,
Work Assignment No. 5-12, May 18, 2000.

P. 308515 - Letter (with attachments) from Ms. Kate Schalk,
308523	Conference Manager, re: Confirmation of

participation as a peer reviewer for the upcoming
U.S. EPA's "Peer Review of Hudson River PCBs
Reassessment, Ecological Risk Assessment Report",
March 15, 2000.

P. 308524 - Peer Review of Hudson River PCBs Reassessment

308524A	RI/FS Phase 2 Reports, Ecological Risk Assessment,

Holiday Inn, Saratoga Springs, New York, June 1-2,
2000, Agenda.

P. 308525 - Peer Review of Hudson River PCBs Reassessment

308525	RI/FS Phase 2 Reports, Ecological Risk Assessment,

Holiday Inn, Saratoga Springs, New York, June 1-2,
2000, List of Reviewers.

P. 308526 - Peer Review of Hudson River PCBs Reassessment

308527	RI/FS Phase 2 Reports, Ecological Risk Assessment,

Holiday Inn, Saratoga Springs, New York, May 30-
June 2, 2000, Logistical Fact Sheet.

37


-------
P. 308528 - Letter (with attachments) to Reviewers from Ms.
308731	Melanie Russo, Eastern Research Group, Inc., re:

Recap of what was presented at the Informational
Meeting for the Peer Review of Hudson River PCBs
Ecological & Human Health Risk Assessment, April
5, 2000.

P. 308732 - Peer Review of the Hudson River PCBs Human Health
308968	& Ecological Risk Assessments, Premeeting

Comments, Saratoga Springs, New York, May 30-June
2, 2000.

3.5 Correspondence

001-0108-0109 Letter to Stephen D. Ramsey, General Electric
Company, from C. Eristoff-Sidamon, Regional
Administrator, U.S. EPA, re: EPA, rather than
General Electric, will conduct the Reassessment
Remedial Investigation/Feasibility Study, June 4,
1990 .

001-0110-0112 Letter to C. Eristoff-Sidamon, Regional

Administrator, U.S. EPA, from Stephen D. Ramsey,
General Electric Company, re: commenting on a June
4, 1990, letter stating that EPA not General
Electric will perform the Reassessment Remedial
Investigation/Feasibility Study for the Hudson
River PCBs site, June 22, 1990.

001-0113-0114 Letter to C. Eristoff-Sidamon, Regional

Administrator, U.S. EPA, from Stephen D. Ramsey,
General Electric Company, re: significant gaps in
the data concerning PCBs in the Hudson River which
are essential to the evaluation of Remedial
alternatives, September 18, 1990.

001-0115-0116 Letter to Stephen D. Ramsey, General Electric
Company, from C. Eristoff-Sidamon, Regional
Administrator, U.S. EPA, re: EPA intends to
conduct the Reassessment Remedial
Investigation/Feasibility Study and that the
public and other interested parties will have
input that study, October 14, 1990.

P. 314486 - Letter to Mr. John F. Welch, Jr., Chairman and

314487 Chief Executive Officer, General Electric Company,
from Mr. Constantine Sidamon-Eristoff, Regional

38


-------
Administrator, U.S. EPA, Region II, re: Meeting on
June 19, 1991, where there was discussion of
advisability of releasing a preliminary
quantitative baseline risk assessment on the
danger to human health from the consumption of
Hudson River fish, July 15, 1991.

P. 314488 - Memorandum to Mr. Daniel Abramowicz, Chair,

314490 Science & Technical Committee, from Mr. Richard
Bopp, New York State Department of Environmental
Conservation, re: Hudson River PCB Reassessment
RI/FS Phase I Report, September 20, 1991.

P. 314491 - Letter to Mr. Doug Blazey, Counsel, U.S. EPA,
314777 Region II, from Mr. M. Peter Lanahan, Manager,

Mid-Atlantic Region, State Government Relations,
General Electric Company, re: Dr. Dan Abramowicz's
Hudson River research, May 5, 1992. (Attachment:
Report: 1991 In Situ Hudson River Research Study:
A Field Study on Biodegration of PCBs in Hudson
River Sediments - Final Report, prepared by
General Electric Company Corporate Research and
Development, February 1992.)

P. 314778 - Letter to Mr. William Muszynski, Acting Regional
314779 Administrator, U.S. EPA, Region II, from Mr.

Stephen D. Ramsey, Vice President, Corporate
Environmental Programs, General Electric Company,
re: Briefing on General Electric's removal of PCBs
from the Allen Mill, March 23, 1994.

P. 314780 - Letter to Ms. Kathleen C. Callahan, Acting Deputy
314781 Regional Administrator, U.S. EPA, Region II, from
Mr. M. Peter Lanahan, Manager, Hudson River
Project, General Electric Company, re: Scheduling
of meetings and requests for updates on the Hudson
River model, April 25, 1994.

P. 314782 - Letter to Mr. Richard L. Caspe, Director,

314785 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. Melvin B. Schweiger,
Manager, Hudson River Project, New York State EHS
Affairs, General Electric Company, re: Hudson
River PCBs Superfund Site - Peer Review, June 10,
1998 .

39


-------
P. 314786 - Letter (w/attachments) to Mr. Damien Hughes, U.S.
314868 EPA, Region II, from Ms. Arlene Levin, Vice
President, Eastern Research Group, Inc., re:
Contract No. 68-W6-0022, Work Assignment No. 3-12,
June 29, 1998.

P. 314869 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,
314870 from Mr. Melvin B. Schweiger, Manager, Hudson

River Project, New York State EHS Affairs, General
Electric Company, re: Peer Review Panel -
Preliminary Model Calibration Report, July 30,
1998 .

P. 314871 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,
314873 from Mr. John G. Haggard, Engineering Project

Manager, Hudson River Project, General Electric
Company, re: Peer Review, January 5, 1999.

P. 314874 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
314875 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Manager, Hudson River Program, General
Electric Company, re: Baseline Modeling Report
Peer Review (3) Charge, December 20, 1999.

P. 31487 6 - Memorandum to Mr. Douglas Tomchuk, Remedial

314877 Project Manager, U.S. EPA, Region II, from Mr. Jay
Field, National Oceanic and Atmospheric
Administration, re: Suggestions for charge
questions for the upcoming Peer Review (3) for the
Baseline Modeling Report, December 20, 1999.

P. 314878 - Letter (w/attachment) to Ms. Alison Hess, Project

314881	Manager, U.S. EPA, Region II, from Mr. John G.
Haggard, Manager, Hudson River Program, General
Electric Company, re: Risk Assessment Peer Review
Charge, February 18, 2000.

P. 314882 - Letter to Ms. Alison Hess, Project Manager, U.S.

314882	EPA, Region II, from Mr. John G. Haggard, Manager,
Hudson River Program, General Electric Company,
re: Risk Assessment Peer Review Charge, February
29, 2000.

P. 314883 - NOAA's Suggested Charge Questions Submitted
314891 February 2000 via e-mail, Peer Review 4.

(Attachments: Letters to Ms. Alison Hess, Project
Manager, U.S. EPA, Region II, from Mr. John G.
Haggard, Manager, Hudson River Program, General

40


-------
P. 314892
314903

P. 314904
314905

P. 314906
314907

P. 314908
314909

P. 314910
314911

P. 314912
314913

Electric Company, re: Risk
Charge, February 18, 2000,
March 6, 2000 . )

Assessment Peer Review
February 29, 2000 and

Letter to Dr. Per Larsson, Assistant Professor,
Ecotoxicology, Department of Ecology, from Mr.

John G. Haggard, Manager, Hudson River Program,
General Electric Company, re: Hudson River PCBs
Superfund Site: Baseline Modeling Report Peer
Review, March 20, 2000. (Attachment: Report:
Critical Issues Imbedded in Fate and Transport
Model Peer Review Charge Question 11, prepared by
Dr. John Connolly, Quantitative Environmental
Analysis, prepared for General Electric Company,
March 2 0, 2000.)

Letter to Robert Willes, Ph.D., Director and
Senior Vice President, Cantox Environmental, Inc.,
from Mr. John G. Haggard, Manager, Hudson River
Program, General Electric Company, re: Hudson
River PCBs Superfund Site: Human Health Risk
Assessment Peer Review, April 28, 2000.

Letter to Pamela Shubat, Ph.D., Environmental
Toxicologist, Minnesota Department of Health, from
Mr. John G. Haggard, Manager, Hudson River
Program, General Electric Company, re: Hudson
River PCBs Superfund Site: Human Health Risk
Assessment Peer Review, April 28, 2000.

Letter to Owen Hoffman, Ph.D., President and
Director, SENES Oak Ridge, Inc., from Mr. John G.
Haggard, Manager, Hudson River Program, General
Electric Company, re: Hudson River PCBs Superfund
Site: Human Health Risk Assessment Peer Review,
April 2 8, 2000.

Letter to Ms. Holly Hattemer-Frey, Senior Risk
Assessment Consultant, SAF*Risk, from Mr. John G.
Haggard, Manager, Hudson River Program, General
Electric Company, re: Hudson River PCBs Superfund
Site: Human Health Risk Assessment Peer Review,
April 2 8, 2000.

Letter to Harlee Strauss, Ph.D., H. Strauss
Associates, Inc., from Mr. John G. Haggard,
Manager, Hudson River Program, General Electric
Company, re: Hudson River PCBs Superfund Site:

41


-------
Human Health Risk Assessment Peer Review, April
28, 2000.

P. 314914 - Letter to Ms. Holly Hattemer-Frey, Senior Risk

314915 Assessment Consultant, SAF*Risk, from Mr. John G.

Haggard, Manager, Hudson River Program, General
Electric Company, re: Hudson River PCBs Superfund
Site: Human Health Risk Assessment Peer Review,
May 9, 2000.

P. 314916 - Letter to Robert Willes, Ph.D., Director and

314917 Senior Vice President, Cantox Environmental, Inc.,
from Mr. John G. Haggard, Manager, Hudson River
Program, General Electric Company, re: Hudson
River PCBs Superfund Site: Human Health Risk
Assessment Peer Review, May 9, 2000.

P. 314918 - Letter to Lee Shull, Ph.D., Principal/Director,
314919 Health & Risk Services Program, NewFields, Inc.,
from Mr. John G. Haggard, Manager, Hudson River
Program, General Electric Company, re: Hudson
River PCBs Superfund Site: Human Health Risk
Assessment Peer Review, April 28, 2000.

P. 314920 - Letter to Pamela Shubat, Ph.D., Environmental

314921 Toxicologist, Minnesota Department of Health, from
Mr. John G. Haggard, Manager, Hudson River
Program, General Electric Company, re: Hudson
River PCBs Superfund Site: Human Health Risk
Assessment Peer Review, May 9, 2000.

P. 314922 - Letter to Owen Hoffman, Ph.D., President and

314923 Director, SENES Oak Ridge, Inc., from Mr. John G.

Haggard, Manager, Hudson River Program, General
Electric Company, re: Hudson River PCBs Superfund
Site: Human Health Risk Assessment Peer Review,
May 9, 2000.

P. 314924 - Letter to Harlee Strauss, Ph.D., H. Strauss
314925 Associates, Inc., from Mr. John G. Haggard,

Manager, Hudson River Program, General Electric
Company, re: Hudson River PCBs Superfund Site:
Human Health Risk Assessment Peer Review, May 9,
2000 .

P. 316890 - Memorandum to Mr. Douglas J. Tomchuk, U.S. EPA,
316902 Region II, from Mr. J. B. Butcher, The Camdus

Group, Inc., re: Memorandum containing updated and

42


-------
revised Log Pearson III flood frequency analysis
for the Fort Edward gage, including routing of
earlier upstream flood peaks, June 25, 1993.
(Attachment: Report: Flood Frequency Analysis,

Fort Edward at Rogers Island Gage, Hudson River,
prepared by The Camdus Group, Inc., June 18,

1993. )

P. 316903 - Memorandum to Dr. Stephen B. Hamilton from Mr.

316905 Patrick 0. Gwinn and Russell E. Keenan, Ph.D., re:
Summary of Screening-level Air Modeling and Human
Health Risk Assessment Results for PCB Vapors from
the Hudson River, February 21, 1997.

P. 316906 - Letter to Ms. Carol M. Browner, Administrator,

316908 U.S. EPA, from Mr. Robert C. Shinn, Jr.,
Commissioner, Department of Environmental
Protection, State of New Jersey, re: Two opinion
pieces that ran in The New York Times, March 30,
1998. (Attachments: (1) News Clipping: Deferring
the Hudson River Cleanup, The New York Times,

March 3, 1998; (2) News Clipping: The Hudson Still
Waits for Help, by Mr. John Cronin, The New York
Times, February 28, 1998.)

P. 316909 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region

316933	II, from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Evaluation of
Analytical Bias in the USGS Water Column Database,
March 22, 1999. (Attachment: Memorandum to Mr.
John G. Haggard, Engineering Project Manager, GE
Corporate Environmental Programs, General Electric
Company from Mr. James Rhea and Mr. Michael Werth,
Quantitative Environmental Analysis, LLC., re:
Phase 2 Evaluation of Analytical Bias in the USGS
Water Column Database, March 22, 1999.)

P. 316934 - Letter to Mr. Mike Stoll, United States Department

316934	of the Interior, Fish and Wildlife Service, from
Ms. Helen Chernoff, Senior Scientist, TAMS
Consultants, Inc., re: Updating a list of federal
and state endangered, threatened, and rare species
and significant habitats along the Hudson River,
March 23, 1999.

43


-------
P. 316935 - Letter to Ms. Helen Chernoff, Senior Scientist,
316940 TAMS Consultants, Inc., from Mr. Mark W. Clough,
acting for Mr. David A. Stilwell, Acting field
Supervisor, United States Department of the
Interior, Fish and Wildlife Service, re: Letter of
March 23, 1999, requesting information on the
presence of Federally listed or proposed
endangered or threatened species in and within one
mile of the Hudson River from Hudson Falls to the
Battery in New York City, New York and New Jersey,
April 14, 1999. (Attachment: Federally Listed and
Proposed Endangered and Threatened Species in New
York, November 4, 1997.)

P. 316941 - Letter to Mr. John G. Haggard, Engineering Project
316948 Manager, GE Corporate Environmental Programs,

General Electric Company, from Ms. Alison A. Hess,
C.P.G., Project Manager, U.S. EPA, Region II, re:
Hudson River PCBs Reassessment, October 7, 1999.

P. 318627 - Letter to Mr. Douglas Beach, Endangered Species
318627 Coordinator, Environmental Assessment Branch,

National Marine Fisheries Service, from Mr. Robert
W. Hargrove, Chief, Environmental Impacts Branch,
U.S. EPA, Region II, re: Federal endangered or
threatened species or critical habitats near the
Hudson River PCBs site, October 16, 1991.

P. 318628 - Letter to Mr. Leonard Corin, Field Supervisor,

318629 U.S. Fish and Wildlife Service, from Mr. Robert W.
Hargrove, Chief, Environmental Impacts Branch,
U.S. EPA, Region II, re: Federal endangered or
threatened species or critical habitats near the
Hudson River PCBs site, October 16, 1991.

P. 318630 - Letter to Mr. Robert W. Hargrove, Chief,

318631 Environmental Impacts Branch, U.S. EPA, Region II,
from Mr. Douglas W. Beach, Fishery Biologist,
National Marine Fisheries Service, re: Federal
endangered or threatened species or critical
habitats near the Hudson River PCBs site, October
21, 1991.

P. 318632 - Letter to Mr. Robert W. Hargrove, Chief,

318633 Environmental Impacts Branch, U.S. EPA, Region II,
from Mr. Leonard Corin, Field Supervisor, U.S.

Fish and Wildlife Service, re: Federal endangered

44


-------
or threatened species or critical habitats near
the Hudson River PCBs site, November 13, 1991

P. 318634 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
318638 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Transmittal of Data Collected by GE - Hudson
River, June 10, 1993.

P. 318639 - Letter to Ms. Kathleen C. Callahan, Acting Deputy

318642	Regional Administrator, U.S. EPA, Region II, from
Mr. M. Peter Lanahan, Manager, GE Corporate
Environmental Programs, General Electric Company,
re: General Electric objects to the start of Phase
3 Hudson River Reassessment, February 23, 1994.

P. 318643 - Letter to Mr. John G. Haggard, Engineering Project

318643	Manager, GE Corporate Environmental Programs,
General Electric Company, from Mr. Douglas J.
Tomchuk, Project Manager, U.S. EPA, Region II, re:
Hudson River PCBs Site - Meeting on Uptake of PCBs
by Fish, April 11, 1994.

P. 318644 - Letter to Mr. M. Peter Lanahan, Manager, Hudson

318645 River Project, General Electric Company, from Ms.
Kathleen C. Callahan, Acting Deputy Regional
Administrator, U.S. EPA, Region II, re: Response
to General Electric objection to the start of
Phase 3 Hudson River Reassessment, April 29, 1994.

P. 318646 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
318650 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Reassessment RI/FS, July 26,

1994 .

P. 318651 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
318653 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. Melvin B. Schweiger,
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Addressing the
Anomalous Loading of PCBs in the Thompson Island
Pool at the Hudson River PCB Superfund Site,

August 15, 1996.

45


-------
P. 318654 - Letter to Paul Simon, Esq., Office of Regional
318661 Counsel, U.S. EPA, Region II, from Mr. Angus

Macbeth, Sidley & Austin, re: Hudson River PCB
Superfund Site: Lower River Sources of PCBs,
October 4, 1996.

P. 318662 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
318665 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, and Dr. Stephen Hammond,
Hazardous Waste Remediation, New York State
Department of Environmental Conservation, from Mr.
John G. Haggard, Engineering Project Manager, GE
Corporate Environmental Programs, General Electric
Company, re: Hudson River Data Collection Program,
March 20, 1997.

P. 318666 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
318667 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Comment on the Scenic Hudson Dredging
Proposal, July 21, 1997.

P. 318668 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
318669 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Comment on the Scenic Hudson Dredging
Proposal, August 13, 1997.

P. 318670 - Letter to Ms. Jeanne M. Fox, Regional

318671 Administrator, U.S. EPA, Region II, from Ms.

Merrilyn Pulver, Councilwoman, Town of Fort
Edward, re: U.S. EPA's program of public
participation for the Hudson River PCBs
Reassessment, January 6, 1998.

P. 318672 - Memorandum to the File, from Ronald Sloan,

318680 Ph.D., Research Scientist, New York State

Department of Environmental Conservation re: Re-
evaluation of the Hudson River Yearling
Pumpkinseed, January 19, 1998.

P. 318681 - Memorandum to Mr. Melvin B. Schweiger, Manager, GE
318701 Corporate Environmental Programs, General Electric
Company and Mr. John G. Haggard, Engineering

46


-------
Project Manager, GE Corporate Environmental
Programs, General Electric Company, from Mr. James
Rhea, HydroQual, Inc., re: Hudson River Project:
Evaluation of Analytical Bias in the USGS Water
Column Database, January 29, 1998.

P. 318702 - Letter to Ms. Merrilyn Pulver, Councilwoman, Town
318703 of Fort Edward, from Mr. Richard Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: U.S. EPA's program of public
participation for the Hudson River PCBs
Reassessment, February 26, 1998.

P. 318704 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region
318706 II and Ronald Sloan, Ph.D., Division of Fish and
Wildlife, New York State Department of
Environmental Conservation, from Mr. John G.
Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: submittal of the report entitled Data
Documentation and Interpretation Report: Submerged
Aquatic Vegetation and Fish Community Analysis,
April 16, 1998.

P. 318707 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region

318709	II and Ronald Sloan, Ph.D., Division of Fish and
Wildlife, New York State Department of
Environmental Conservation, from Mr. John G.
Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: submittal of the report entitled Data Report:
Macroinvertebrate Communities and Diets of
Selected Fish Species in the Upper Hudson River,
May 1, 1998.

P. 318710 - Letter to Mr. Mike Stoll, United States Department

318710	of the Interior Fish and Wildlife Service, from
Ms. Helen Chernoff, Senior Scientist, TAMS
Consultants, Inc., re: Updating a list of federal
and state endangered, threatened, and rare species
and significant habitats along the Hudson River,
March 23, 1999.

P. 318711 - Letter to Ms. Helen Chernoff, Senior Scientist,
318715 TAMS Consultants, Inc., from Mr. Mark W. Clough
acting for Mr. David A. Stilwell, Acting field
Supervisor, United States Department of the
Interior Fish and Wildlife Service, re: Letter of

47


-------
March 23, 1999, requesting information on federal
and state endangered, threatened, and rare species
and significant habitats along the Hudson River,
April 14,1999. (Attachment: Federally Listed and
Proposed Endangered and Threatened Species in New
York, November 4, 1997.)

P. 318716 - Letter to Ms. Jeanne M. Fox, Regional

318717 Administrator, U.S. EPA, Region II, from Mr.

Stephen D. Ramsey, Vice President, GE Corporate
Environmental Programs, General Electric Company
re: Hudson River PCBs Superfund Site, May 10,

1999.

P. 318718 - Letter to Ms. Jeanne M. Fox, Regional

318719	Administrator, U.S. EPA, Region II, from Mr.
Stephen D. Ramsey, Vice President, GE Corporate
Environmental Programs, General Electric Company
re: Peer review of U.S. EPA and GE models of the
Upper Hudson River, May 28, 1999.

P. 318720 - Letter to Ms. Jeanne M. Fox, Regional

318720	Administrator, U.S. EPA, Region II, from Mr.
Stephen D. Ramsey, Vice President, GE Corporate
Environmental Programs, General Electric Company
re: Peer review of U.S. EPA and GE models of the
Upper Hudson River, June 2, 1999.

P. 318721 - Letter to Mr. Stephen D. Ramsey, Vice President,
318725 GE Corporate Environmental Programs, General
Electric Company, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Hudson River
PCBs Superfund Site, June 10, 1999.

P. 318726 - Letter to Mr. Joseph J. Seebode, Chief, Regulatory
318727 Branch, U.S. Army Corps of Engineers, from Mr.

Douglas J. Tomchuk, project Manager, U.S. EPA,
Region II, re: Hudson River PCBs Superfund Site
and Public Notice Number: 1999-00380-YM & YN, June
24, 1999.

P. 318728 - Letter to Mr. John G. Haggard, Manager, Hudson

318733 River PCBs Program, General Electric Company, from
Mr. William J. McCabe, Deputy Director, Emergency
and Remedial Response Division, U.S. EPA, Region
II,, U.S. EPA, Region II, re: Hudson River PCBs
Reassessment, September 2, 1999.

48


-------
P. 318734 - Letter to Mr. Stephen D. Ramsey, Vice President,
318735 GE Corporate Environmental Programs, General
Electric Company, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Hudson River
PCBs Superfund Site, September 30, 1999.

P. 318736 - Letter to Honorable Jeanne M. Fox, Administrator,
318738 U.S. EPA, Region II, from Mr. Stephen D. Ramsey,
Vice President, GE Corporate Environmental
Programs, General Electric Company re: Hudson
River PCBs Superfund Site, November 9, 1999.

P. 318739 - Letter to Mr. Stephen D. Ramsey, Vice President,

318740	GE Corporate Environmental Programs, General
Electric Company, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: U.S. EPA's
decision not to conduct a simultaneous peer review
of the modeling studies prepared by EPA and GE,
January 6, 2000.

P. 318741 - Letter to Mr. Christopher Mantzaris, Assistant

318741	Regional Administrator for Protected Resources,
National Marine Fisheries, from Ms. Grace
Musumeci, Chief, Environmental Review Section,
Strategic Planning and Multi-Media Programs
Branch, U.S. EPA, Region II, re: Hudson River PCBs
Superfund Site, February 16, 2001.

P. 318742 - Letter to Ms. Grace Musumeci, Chief, Environmental
318743 Review Section, Strategic Planning and Multi-Media
Programs Branch, U.S. EPA, Region II, from Ms.

Mary Colligan, Acting Assistant Regional
Administrator for Protected Resources, National
Marine Fisheries, re: Request for information on
federally listed threatened or endangered species
and/or designated critical habitats along the
Hudson River, May 7, 2001.

P. 318744 - Memorandum to Ms. Alison A. Hess, Remedial Project
318751 Manager, Special Projects Branch, U.S. EPA, Region
II, from Ms. Mindy J. Pensak, Coordinator,
Biological Technical Assistance Group, U.S. EPA,
Region II, re: Biological Technical Assistance
Group Review, Hudson River PCBs, May 17, 2001.

49


-------
P. 322566 - Letter to Mr. William Ports, P.E., Bureau of

322572 Eastern Remedial Action, New York State Department
of Environmental Conservation, from Mr. Douglas J.
Tomchuk, Project Manager, Eastern New
York/Carribean Compliance Section, U.S. EPA,

Region II, re: Hudson River PCBs Site - Scope of
Work for the Reassessment RI/FS, November 21,

1990 .

P. 322573 - Letter to Mr Douglas Tomchuk, Remedial Project

322657	Manager, U.S. EPA, Region II, from Mr. William T.
Ports, P.E., Environmental Engineer 2, New York
State Department of Environmental Conservation,
re: Hudson River PCB Sites, Site No.: 5-46-031,
November 30, 1990. (Attachments: (1) Memorandum
to Mr. Bill Ports, Bureau of Eastern Remedial
Action, from Mr. John Dergosits, Project Manager,
New York State Department of Environmental
Conservation, re: Hudson River PCB Project
Reassessment Remedial Investigation/Feasibility
Study, RI/FS, November 30, 1990; (2) Report:

Hudson River PCB Study Description and Detailed
Work Plan, Implementation of PCB Settlement,
prepared by New York Department of Environmental
Conservation, revised January 1979.)

P. 322658 - Letter to Mr. John Claussen, Corporate

322658	Environmental Programs, General Electric Company,
from Mr. Douglas J. Tomchuk, Project Manager,
Eastern New York/Caribbean Section II, U.S. EPA,
Region II, re: Hudson River PCBs Site - Data
Needs, January 24, 1991.

P. 322659 - Letter to Mr. Stephen Hammond, Hazardous Waste

322659	Remediation, New York State Department of
Environmental Conservation, from Mr. John G.
Haggard, Technical Project Manager, General
Electric Company, re: Soils Investigation Results
- Scott Paper Property, December 12, 1991.

P. 322660 - Letter to Mr. Douglas J. Tomchuk, Remedial Project

322662 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Engineering Project Manager, General
Electric Company, re: Hudson River Reassessment-
Phase 2A Data Collection, February 5, 1992.

50


-------
P. 322663 - Letter to Mr. William Muszynski, Acting Regional
322664 Administrator, U.S. EPA, Region II, from Mr. M.

Peter Lanahan, Manager, Hudson River Project,
General Electric Company, re: Request EPA to
modify the scope of work of its Hudson River
RRI/FS, March 3, 1993.

P. 322665 - Letter to Mr. John Haggard, Technical Project
322666 Manager, General Electric Company, from Mr.

Douglas J. Tomchuk, Project Manager, Hudson River
PCBs Site Reassessment, U.S. EPA, Region II, re:
Hudson River PCBs Site - Congener-Specific PCB
Analysis, March 10, 1993.

P. 322667 - Letter to Mr Douglas Tomchuk, Remedial Project

322668 Manager, U.S. EPA, Region II, from Mr. William T.

Ports, P.E., Environmental Engineer 2, Bureau of
Central Remedial Action, Division of Hazardous
Waste Remediation, New York State Department of
Environmental Conservation, re: Hudson River
Reassessment RI/FS, Site No.: 5-46-031, April 5,
1993.

P. 322669 - Letter to Mr. M. Peter Lanahan, Corporate

322672 Environmental Programs, General Electric Company,
from Mr. William J. Muszynski, P.E., Acting
Regional Administrator, U.S. EPA, Region II, re:
in response to GE's letter of March 3, 1993 and
the meeting of March 4, 1993, April 22, 1993.
(Attachment: Attachment, Hudson River PCBs Site
Priorities List for Data Transmittal.)

P. 322673 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
322694 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, General Electric
Company, re: Transmittal of Data Collected by GE -
Hudson River, May 18, 1993. (Attachments: (1)
Attachment 1, File Structure Tables, Environmental
Samples Data Base and Congener Peak Data Base,
Hudson River Project; (2) Attachment 2, Data
Summary Reports.)

P. 322695 - Letter to Ms. Kathleen C. Callahan, Acting Deputy
322698 Regional Administrator, U.S. EPA, Region II, from
Mr. M. Peter Lanahan, Jr., Manager, Hudson River
Project, General Electric Company, re: General
Electric's objection to EPA's intention to begin

51


-------
Phase 3 of the Hudson River Reassessment without
first issuing Phase 2 report for public comments,
February 23, 1994.

P. 322699 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
322704 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, General Electric
Company, re: Hudson River Reassessment: EPA
Modeling Efforts, July 27, 1994.

P. 322705 - Memorandum to Mr. Douglas Tomchuk, Project

322708 Manager, New York/Caribbean Superfund Branch II,
U.S. EPA, Region II, and Ms. Helen Chernoff, TAMS
Consultants, Inc., from Mr. Jay Field, U.S.
Department of Commerce, National Oceanic and
Atmospheric Administration, Hazardous Materials
Response and Assessment Division, re: Hudson River
Data Release 3.1 Fish Data, January 22, 1996.
(Attachments: (1) NOAA Fish Samples; (2) EPA/TAMS
Fish Samples.)

P. 322709 - Letter to Mr. Melvin Schweiger, Manager - Hudson
322710 River Project, General Electric Company, from Mr.

Douglas J. Tomchuk, Remedial Project Manager, U.S.
EPA, Region II, re: Hudson River PCBs Site -
Additional Data Collections with Respect to
Thompson Island Pool "Anomaly", September 3, 1996.

P. 322711 - Letter to Mr. Richard L. Caspe, Director, Water

322712 Quality Management, U.S. EPA, Region II, from Mr.
Melvin B. Schweiger, Manager, Hudson River
Project, General Electric Company, re: Hudson
River PCBs Superfund Site, September 9, 1996.

P. 322713 - Letter to Mr. Melvin Schweiger, Manager - Hudson
322714 River Project, General Electric Corporation, from
Mr. Richard L. Caspe, Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: GE Investigations of Thompson Island Pool
"Anomaly", October 11, 1996.

P. 322715 - Letter to Mr. Douglas Tomchuk, Remedial Project
322716 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Engineering Project Manager, Hudson River
Project, General Electric Company, re:
Interpretation of TIP Time of Travel Surveys,
October 9, 1997. (Note: The attachment to this

52


-------
letter can be found in Hudson River PCBs
Administrative Record, Update #7, pp. 312524 -
312541A.)

P. 322717 - Letter to Mr. Douglas Tomchuk, Project Manager,
322718 U.S. EPA, Region II, and Mr. Walter Demick, New
York State Department of Environmental
Conservation, from Mr. John G. Haggard,

Engineering Project Manager, Hudson River Project,
General Electric Company, re: Corrections to the
U.S. GS Water Column Data, February 10, 1998.

P. 322719 - Letter (w/attachments) to Mr John Haggard,

322763 Engineering Project Manager, General Electric
Company, from Mr. Douglas J. Tomchuk, Project
Manager, Hudson River PCBs Reassessment, U.S. EPA,
Region II, re: Hudson River PCBs Site - Memoranda
on GE Sampling Data, February 26, 1998.

P. 322764 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
3227 65 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, Hudson River Project,
General Electric Company, re: Summary of Research
Efforts: Origin of PCB Loading in the Thompson
Island Pool, March 23, 1998. (Note: The
attachment to this letter can be found in Hudson
River PCBs Administrative Record, Update #7, pp.
312710 - 312843.)

P. 322766 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
3227 67 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, Hudson River Project,
General Electric Company, re: TIP Sediment Coring
Program - Sampling and Analysis Plan, June 12,
1998. (Note: The attachment to this letter can be
found in Hudson River PCBs Administrative Record,
Update #7, pp. 309243 - 309377.)

P. 322768 - Letter to (w/attachment) Mr. Mike Erickson, Limno-
322771 Tech, Inc., from Mr. C. Kirk Ziegler, Quantitative
Environmental Analysis, LLC., re: Estimated
tributary sediment loading in Reaches 2 to 7
(Thompson Island Dam to Waterford), September 14,
1998 .

53


-------
P. 322772 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
322773 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, and Ronald Sloan, Ph.D., New
York State Department of Environmental
Conservation, Division of Fish and Wildlife, from
Mr. John G. Haggard, Engineering Project Manager,
Hudson River Project, General Electric Company,
re: Field Sampling Plan for Analysis of Food-Web
Structure of the Upper Hudson River, Spring 1998
and Data Report: Macroinvertebrate Communities and
Diets of Selected Fish Species in the Upper Hudson
River, November 5, 1998. (Note: The attachments
to this letter can be found in Hudson River PCBs
Administrative Record, Update #7, pp. 309378 -
309561 and pp. 312957 - 313016.)

P. 322774 - Letter to Mr. Douglas Tomchuk, Remedial Project

322775 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, Hudson River Project,
General Electric Company, re: Hudson River Data
Documentation Reports - 1997 and January 1998 High
Flow Monitoring Results, April 23, 1999. (Note:
The attachments to this letter can be found in
Hudson River PCBs Administrative Record, Update
#7, pp. 311087 - 311423 and 310978 - 311086.)

P. 32277 6 - Memorandum to Mr. John Connolly, from Mr. Mike
322777 Erickson, Re: Request for GE Sediment Transport
Model Results, July 14, 1999.

P. 322778 - Letter (w/attachment) to Colleague, from John F.
322787 Brown, Jr., Ph.D., Manager, Environmental

Toxicology, GE Corporate Research and Development,
re: Poster PHA032, "Local Spatial Variabilities
and Overall Regional Trends Indicate Local Sources
for the PCBs in Hudson River Sediments", November
30, 1999.

P. 322788 - Letter to Mr. James N. Ludlam, P.E., Project
322789 Manager, New York State Department of

Environmental Conservation, from Mr. Melvin
Hauptman, P.E., Leader, Sediment
Projects/Caribbean Team, Emergency and Remedial
Response Division, U.S. EPA, Region II, re: EPA
comments on November 1999 Proposed Remedial Action
Plan, February 22, 2000.

54


-------
P. 322790 - Letter to Mr. Richard L. Caspe, Director,

322823 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. John G. Haggard, Manager,
General Electric Company, re: Results of General
Electric sponsored PCB analysis of fish collected
in 2000 by New York State Department of
Environmental Conservation from Upper Hudson
River, December 22, 2000. (Attachments: (1)
Temporal Trends in Upper Hudson River PCBs, August
16, 2000; (2) Issues to Consider When Using Fish
PCB Data for Trend Analysis, August 16, 2000.)

P. 322904 - Letter to Mr. Michael T. Huguenin, President,
322909 Industrial Economics, Inc., from Mr. Donald

MacDonald, President, MacDonald Environmental
Sciences Ltd., re: Review of document Comments of
General Electric Company on Volume 2E - Baseline
Ecological Risk Assessment: Hudson River PCBs
Reassessment RI/FS, December 1, 1999.

P. 322910 - Letter to Ms. Anne Secord, U.S. Fish and Wildlife
322918 Service, from John P. McCarty, Ph.D., re:

Comments on GE's evaluation of the Hudson River
Tree Swallow study, May 22, 2001.

P. 322919 - Letter to Dr. Kiviat, from Ms. Helen Chernoff,
322920 Environmental Scientist and Mr. Mark Moese,

Environmental Scientist, TAMS Consultants, Inc.,
re: Lower Hudson River, August 31, 1999.

P. 322921 - Memorandum to Hudson River Team, from Ms. Trina
322922 von Stackelberg, Menzie-Cura & Associates, Inc.,
re: STB ratio to LMB for River Mile 152, December
7, 1999.

P. 322923 - E-mail to , from Mr. Peter Nye,

322925	New York State Department of Environmental
Conservation, re: Hudson River Bald Eagle Breeding
Success, February 25, 2000.

P. 322926 - Telephone Log re: call to Mr. Dave Mayack, Hale

322926	Creek Field Station, New York State Department of
Environmental Conservation, from Ms. Helen
Chernoff, Environmental Scientist, TAMS
Consultants, Inc., re: Update of Furbearer
Organochlorine Studies, May 31, 2000.

55


-------
P. 323028 - Letter (w/attachments) to Mr. William Ports, P.E.,

323030 New York State Department of Environmental

Conservation, from Mr. Edward K. LaPoint, P.E.,
Manager, Remedial Programs, General Electric
Company, re: Summary of Analytical Results for
Seeps, Soil and Sediment Samples, GE Fort Edward
Outfall 004, May 11, 1994.

P. 323031 - Facsimile (w/attachments) to Mr. A1 DiBernardo,

323035 TAMS Consultants, Inc., from Mr. William Ports,
P.E., New York State Department of Environmental
Conservation, re: Report: General Electric
Company, Fort Edward Monthly Progress Report, June
1994, July 20, 1994.

P. 323036 - Record of telephone conversation with Mr. William

323038	Ports, New York State Department of Environmental
Conservation, by Mr. Michael L. Spera, TAMS
Consultants, Inc., re: Hudson River, August 18,
1994 .

P. 323039 - Facsimile to Mr. Edward Garvey, TAMS Consultants,

323039	Inc., from Mr. Michael L. Spera, TAMS Consultants,
Inc., re: Wastewater flows from STPs in the Albany
and Troy area discharging into the Lower Hudson
River, January 14, 1997.

P. 323040 - Telephone Log of conversation with Mr. Ronald

323040	Sloan, New York State Department of Environmental
Conservation, from Menzie-Cura & Associates, Inc.,
re: Ratio of 2.5 for LMB for fillet to whole body
and 1.5 for brown bullhead, February 10, 1999.

P. 323041 - Online News Article: New York State Canal System

	323044 Notice to Mariners, Locks C-l and C-2 Added to

	Champlain Closure, New York State Canal

Corporation, June 7, 2000. (Attachment: Online
News Article: New York State Canal System Notice
to Mariners, NYS Canal From C-3 to C-4 Closed Due
to High Water, New York State Canal Corporation,
June 7, 2 0 0 0.)

P. 323045 - Online News Article: New York State Canal System

	32304 6 Notice to Mariners, Champlain Reopened, Erie

Remains Closed, New York State Canal Corporation,
June 8, 2000.

56


-------
P. 323047 - E-mail to GarveyQTAMSNJo.PO_NJ, from Mr. William

323058 Ports, P.E., New York State Department of

Environmental Conservation, re: Information on GE
Hudson Falls and Fort Edward, June 8, 2000.
(Attachments: (1) Fact Sheet: Public Comment
Period Extended on Remedial Action Plan for GE
Fort Edward Plant Site, prepared by New York State
Department of Environmental Conservation, March
1999; (2) Fact Sheet: Proposed Remedial Action
Plan Announced for General Electric Hudson Falls
Plant, prepared by New York State Department of
Environmental Conservation, November 1999.)

P. 323059 - Telephone Log of conversation with Mr. David

323060 Mayack, New York State Department of Environmental
Conservation, Hale Creek, by Ms. Katherine von
Stackelberg, Menzie-Cura & Associates, Inc.,
November 10, 2000.

P. 323061 - E-mail to Hudson Archives; Ms Claire Hunt; Ms.

323065	Helen Chernoff; kvon@menziecura.com, from Ms.
Katherine von Stackelberg, Menzie-Cura &
Associates, Inc., re: Hudson River mammal
contaminant data, November 13, 2000. (Attachment:
Letter to Project Collaborator, from Mr. Jeff
Loukmas, Research Support Specialist, Cooperative
Fish and Wildlife Research Unit, Cornell
University, re: 1999-2000 trapping season of
animals for the Hudson River contaminant
monitoring project, undated.)

P. 323066 - Memorandum to TAMS Consultants, from Ms. Tina

323066	Souza, Gradient Corporation, re: Personal
Communication with R. Montione, H. Rudnick,
December 21, 2001.

ERA Lower River RS References

P. 323067 - Telephone Log of conversation with Mr. David

323067	Mayack, New York State Department of Environmental
Conservation, by Ms. Helen Chernoff, Environmental
Scientist, TAMS Consultants, Inc., re: Hudson
River Furbearer Studies, August 30, 1999.

P. 323068 - Letter to Mr. Michael Huguenin, President,

323068	Industrial Economics, Inc., from Emily Monosson,
Ph.D., Monosson Environmental Research, re:
Response to General Electric's comments on Volume

57


-------
2E Baseline Ecological Risk Assessment, Hudson
River PCBs Reassessment RI/FS, November 5, 1999.

p. 323069 - E-mail to Mr. John Haggard, General Electric

323072	Company, from Mr. Michael Werth, Quantitative
Environmental Analysis, LLC, re: Database
Transmittal 2/1/00, February 1, 2000.

(Attachments: 2 Disks: Quantitative Environmental

Analysis, LLC zip files containing updates of the
Hudson River databases, 2/1/00.)

P. 323073 - Telephone Log of conversation with Ms. Anne

323073	Secord, U.S. Fish and Wildlife Service, from Ms.
Helen Chernoff, Environmental Scientist, TAMS
Consultants, Inc., re: Status of Avian Hudson
River Data, May 31, 2000.

	ERA (Revised) References

P. 323074 - E-mail to , from Mr. Joseph Bopp,

323074	re: Hudson River Fauna, December 6, 1999.

P. 323075 - E-mail to , from Mr. Peter Nye,
323076 New York State Department of Environmental

Conservation, re: Hudson River, August 9, 2000.

ERA Upper River RS References

P. 323077 - Report: Radiotelemetrv Study: River Otters

	3230 8 8 Reintroduction at Letchworth State Park, Progress

Report #1, prepared for New York Department of
Environmental Conservation, New York River Otter
Project and New York State Office of Parks,
Recreation and Historic Preservation, prepared by
Mr. Romeo M. Spinola, The Pennsylvania State
University; Mr. Thomas L. Serfass, Frostburg State
University; and Mr. Robert P. Brooks, The
Pennsylvania State University, undated.

DEIR References

P. 323089 - Letter (w/attachments) to Mr. Bruce Fidler, TAMS
323110 Consultants, Inc., from Mr. John R. Dergosits,

P.E., Project Manager, New York State Department
of Environmental Conservation, re: Hudson River
PCB Reassessment RI/FS, June 22, 1994.

58


-------
ERA Lower River References

P. 323111 - E-mail to Mr. Edward Garvey, TAMS Consultants,
323114 Inc., from Quantitative Environmental Analysis,
LLC, re: Database Transmittal 3/1/99, March 2,
1999. (Attachments: 2 Disks, Quantitative
Environmental Analysis, LLC zip files containing
updates of the Hudson River databases, 3/2/99.)

P. 323115 - Letter (w/attachments) to Ms. Helen Chernoff,

323124 Environmental Scientist, TAMS Consultants, Inc.,
from Mr. Lawrence C. Bickford, Croton-on-Hudson,
re: Hudson River Bird Sightings, October 7, 1999.

P. 323125 - E-mail to " jo3n@email.msn.com"@TAMS_NY.GWIA;

323128 "KvonQigc.org"@TAMS_NY.GWIA, from Victor J.

Bierman, Jr., Ph.D., Associate Vice President,
Limno-Tech, Inc., re: New HUDTOX Hindcast Results,
October 20, 1999. (Attachments: 2 Disks, Limno-
Tech, Inc.,zip files containing revised HUDTOX
hindcast results, 10/20/99.)

P. 323129 - E-mail to "jo3n@email.msn.com"@TAMS_NY.GWIA;

323131 HUNTQTAMSNJo.PO_NJ from Victor J. Bierman, Jr.,

Ph.D., Associate Vice President, Limno-Tech, Inc.,
re: Federal Dam Forecasts-ZIP File, November 1,
1999. (Attachments: 2 Disks, Limno-Tech, Inc.,
zip files containing HUDTOX 70 year forecast
results for Federal Dam loadings, 11/1/99.)

ERA References

P. 323132 - Letter (w/attachments) to Mr. John Schaffer, TAMS
323141 Consultants, Inc., from David T. Mayack, Ph.D.,
New York State Department of Environmental
Conservation, re: NYS DEC research on mink in the
Hudson River Valley, Work plan for current and
future work, March 18, 1999.

LRC References

P. 323142 - Memorandum to Ms. Claire Hunt, TAMS Consultants,
323149 Inc. and Mr. Edward Garvey, TAMS Consultants,

Inc., from Mr. J.B. Butcher, Tetra Tech, Inc., re:
Low Res vs High Res MDPR/DMW stats, January 19,
1998 .

59


-------
P. 323150 - Memorandum to Mr. Edward Garvey, TAMS Consultants,
323154 Inc., from Mr. J.B. Butcher, Tetra Tech, Inc., re:
Low Res vs CC DN-50/Mean Phi stats, February 17,
1998 .

4.0 FEASIBILITY STUDY

4.3 Feasibility Study Reports

P. 400001-	Report: Hudson River PCBs Reassessment RI/FS,

	400053	Phase 3 Feasibility Study, Scope of Work, prepared

by TAMS Consultants, Inc., New York, NY, prepared
for the U.S. EPA, Region II, and U.S. Army Corps
of Engineers, Kansas City District, September
1998 .

P. 400054- Report: Hudson River PCBs Reassessment RI/FS,

	40 0170	Responsiveness Summary For Phase 3-Feasibilitv

	Study, Scope of Work, Book 1 of 1, prepared by

TAMS Consultants, Inc., prepared for U.S. EPA,
Region II, U.S. Army Corps of Engineers, Kansas
City District, June 1999.

P. 400207 - Report: Hudson River PCBs Reassessment RI/FS,

	400852 Phase 3 Report: Feasibility Study, Book 1 of 6,

Report Text, prepared by TAMS Consultants, Inc.,
prepared for U.S. EPA, Region II and U.S. Army
Corps of Engineers, Kansas City District,
December 2 0 0 0.

P. 400853 - Report: Hudson River PCBs Reassessment RI/FS,

	401198 Phase 3 Report: Feasibility Study, Book 2 of 6,

Tables and Figures, prepared by TAMS Consultants,
Inc., prepared for U.S. EPA, Region II and U.S.
Army Corps of Engineers, Kansas City District,
December 2 0 0 0.

Q. 401199 - Report: Hudson River PCBs Reassessment RI/FS,

	40133 0 Phase 3 Report: Feasibility Study, Book 3 of 6,

Plates, prepared by TAMS Consultants, Inc.,
prepared for U.S. EPA, Region II and U.S. Army
Corps of Engineers, Kansas City District,
December 2 0 0 0.

p. 401331 - Report: Hudson River PCBs Reassessment RI/FS,

	4015 0 0 Phase 3 Report: Feasibility Study, Book 4 of 6,

Appendix A through Appendix C, prepared by TAMS

60


-------
Consultants, Inc., prepared for U.S. EPA, Region
II and U.S. Army Corps of Engineers, Kansas City
District, December 2000.

P. 401501 - Report: Hudson River PCBs Reassessment RI/FS,

	402 0 7 8 Phase 3 Report: Feasibility Study, Book 5 of 6,

Appendix D through Appendix H, prepared by TAMS
Consultants, Inc., prepared for U.S. EPA, Region
II and U.S. Army Corps of Engineers, Kansas City
District, December 2000.

P. 402079 - Report: Hudson River PCBs Reassessment RI/FS,

	4 02 62 7 Phase 3 Report: Feasibility Study, Book 6 of 6,

	Appendix I, prepared by TAMS Consultants, Inc.,

prepared for U.S. EPA, Region II and U.S. Army
Corps of Engineers, Kansas City District,
December 2 0 0 0.

P. 402628 - Report: Aerobic and Anaerobic Biodegradation of

	402709 PCBs, Presentation to EPA Region II, prepared by

Mr. Daniel A. Abramowicz, Manager, Environmental
Technology Program, Biological Sciences
Laboratory, GE Research & Development Center,
prepared for U.S. EPA, Region II, December 17,
1990 .

P. 402710 - Report: Advances in Dredging Contaminated

	402811 Sediment, New Technologies and Experience Relevant

to the Hudson River PCBs Site, prepared by Mr.
Joshua Cleland, Scenic Hudson, Inc., April 1997.

P. 402812 - Report: An Evaluation of the Feasibility of

	4 02 8 52 Environmental Dredging in the Upper Hudson River,

	Including An Evaluation and Critigue of Scenic

Hudson's Dredging Report, prepared by General
Electric Corporate Environmental Programs, May
1997 .

P. 402853 - Report: Comments On Advances In Dredging

	402870 Contaminated Sediment, prepared by John B.

Herbich, Ph.D., P.E., prepared for Corporate
Environmental Programs, General Electric Company,
June 23, 1997.

P. 402871 - Report: Results of Contaminated Sediment Cleanups
	4 02 94 9 Relevant to the Hudson River, An Update to Scenic

61


-------
Hudson's Report Advances in Dredging Contaminated
Sediment, prepared by Mr. Joshua Cleland, Scenic
Hudson, Inc., October 2000.

P. 402950 - Report: Pre-Peer Review Preliminary Draft,

	4 02 966 Environmental Results on Dredging Projects,

prepared by Mr. James J. Hahnenberg,
Geologist/Remedial Project Manager, U.S. EPA,
Region V, Superfund Division, February, 2001.

P. 402990 - Report: New York State Canal System Notice to

403013 Mariners, Changes to Published Depth, Revision 1,
prepared by New York State Canal Corporation, May
18, 2001.

P. 403014 - Photographs: General Electric Dredging at Hudson
403067 Falls Pumphouse, prepared by NYS DEC,1997-1998.

P. 403068 - Report: Hudson River PCBs Reassessment RI/FS

	4 0313 9 "Landfill/Treatment Facility Siting Survey",

prepared by TAMS Consultants, Inc., prepared for
U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, December 1997.

P. 403140 - Report: Hudson River PCBs Reassessment RI/FS
4 0 32 5 9 "Evaluation of Removal Action Alternatives,

Thompson Island Pool, Early Action Assessment",
prepared by TAMS Consultants, Inc., prepared for
U.S. EPA, Region II and U.S. Army Corps of
Engineers, Kansas City District, March 1999.

P. 403319 - Report: NYS Department of Environmental

403321 Conservation Website, Division of Mineral

Resources, Minerals Site Index, Snapshot of Non-
Fuel Mining in New York State, September 5, 2001.
(Attachment: Disk: NYSDEC Excel Spreadsheet of
Sand and Gravel Mines.)

P. 403323 - Letter (w/attachments) to Mr. John J. Szeligowski,
403326 TAMS Consultants, Inc., from Mr. John R.

Dergosits, P.E., Canal Environmental Engineer, New
York State Canal Corporation, re: enclosed 1999
dredge chart for the Champlain Canal, September
29, 2000.

P. 403327 - Report: Upper Hudson River Spottail Shiner, River

	4 0 332 7 Length-Weighted Whole Body Average PCB

Concentration (in mg/kg), undated.

62


-------
4.4 Proposed Plans

P. 400171 - Plan: Superfund Proposed Plan, Hudson River PCBs

	400200	Superfund Site, New York, prepared by U. S. EPA,

Region II, December 2000.

4.6 Correspondence

P. 400201 - Memorandum to Ms. Alison Hess, Remedial Project

400203	Manager, U.S. EPA, Region II, from Ms. Mindy J.
Pensak, Coordinator, Biological Technical
Assistance Group (DESA-HWSB), re: Biological
Technical Assistance Group Review, Hudson River
PCBs, November 3, 2000.

P. 400204 - Memorandum to Ms. Jennie Delcimento,

400204	Administrative Record Coordinator, Emergency and
Remedial Response Division, U.S. EPA, Region II,
from Mr. Douglas Fischer, Attorney, Office of
Regional Counsel, U.S. EPA, Region II, re:
Biological Technical Assistance Group Review
Memorandum, December 8, 2000.

P. 400205 - Memorandum to File, from Ms. Alison A. Hess,

400206 C.P.G., Project Manager, U.S. EPA, Region II, re:
Avid Recreator Scenario, December 8, 2000.

P. 402967 - Letter to Ms. Kathleen C. Callahan, Acting Deputy

402970	Regional Administrator, U.S. EPA, Region II, from
Mr. M. Peter Lanahan, Jr., Manager, Hudson River
Project, General Electric Company, re: General
Electric's request that EPA not proceed with Phase
3 until making the Phase 2 report available for
public comment along with the FS Scope of Work,
February 23, 1994.

P. 402971 - Letter to All Interested Parties, from Mr. Douglas

402971	J. Tomchuk, Project Manager, U.S. EPA, Region II,
re: Clarification of certain language in the
feasibility study scope of work, November 5, 1998.

P. 402972 - Memorandum to Mr. Bruce Fidler, TAMS Consultants,

402977 Inc., from Mr. John Szeligowski, TAMS Consultants,
Inc., re: Sediment Transfer and Processing Sites,
January 17, 2001.

63


-------
P. 402978 - Memorandum to Mr. Richard L. Caspe, Director,
402981 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. Bruce K. Means, Chair,
National Remedy Review Board, U.S. EPA, re:
National Remedy Review Board Recommendations for
the Hudson River PCBs Site, December 5, 2000.

P. 402982 - Memorandum to Mr. Bruce K. Means, Chair, National
402989 Remedy Review Board, U.S. EPA, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: National Remedy
Review Board Recommendations for the Hudson River
PCBs Site, January 18, 2001.

P. 403260 - Memorandum to Mr. Connie Eristoff, from Mr. Herb
403260 Barrack, The Assistant Regional Administrator,

Office of Policy and Management, U.S. EPA, Region
II, re: Response to EPA's inquiry concerning the
impacts of PCB contamination on maintenance
dredging operations in the Hudson River, June 28,
1990 .

P. 403261 - Letter to Ms. Alison Hess and Mr. Douglas Tomchuk,
403299 U.S. EPA, Region II, from Mr. John G. Haggard,
Manager, Hudson River Program, General Electric
Company, re: Feasibility Study for Hudson River
PCBs Superfund Site: Use of Models, April 20,
2000. (Attachments: (1) Table 1, Time for
Implementation of Remedial Dredging Projects; (2)
Table 2, Time for Implementation of Remedial
Dredging Projects, (3) Figure 1; (4) Figure 2,
Sediment Volume Removed vs Time: Dredging
Projects; (5) Figure 3, Sediment Volume Removed vs
Time: Dredging Projects; (6) Figure 4, Pre- and
Post Dredging Sediment PCB Concentrations; (7)
Presentation made to: National Research Council's
Committee on Remediation of PCB-Contaminated
Sediments Meeting, November 8, 1999.)

P. 403300 - Letter to Ms. Jeanne M. Fox, Regional

403308 Administrator, U.S. EPA, Region II, from Mr.

Stephen D. Ramsey, Vice President, Corporate
Environmental Programs, General Electric Company,
re: Hudson River Meeting Follow-up, July 20, 2000.
(Attachments: (1) Letter (w/attachments) to Ms.
Jackson, Chief, New York/Caribbean Superfund
Branch, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. Douglas C. Premo,

64


-------
Project Coordinator, General Motors, June 14,
1996. )

P. 403309 - Letter (w/attachment) to Mr. John J. Szeligowski,
403310 TAMS, from Mr. John R. Dergosits, P.E., Canal
Environmental Engineer, New York State Canal
Corporation, re: Response to request for Champlain
Canal traffic figures, August 29, 2000.

P. 403311 - Letter to Mr. David A. Stilwell, Field Supervisor,
403312 U.S. Fish and Wildlife Service, Division of

Ecological Services, from Ms. Grace Musumeci,
Chief, Environmental Review Section, U.S. EPA,
Region II, re: Hudson River Superfund Site, June
29, 2001.

P. 403313 - Letter to Mr. Douglas Tomchuck, Project Manager,
403318 Hudson River PCBs Site, U.S. EPA, Region II, from
Donald F. Hayes, Ph.D., P.E., Associate Professor,
The University of Utah, re: Issues relative to
work on Hudson River Project, August 9, 2001.

P. 403322 - E-mail to Mr. Ed Garvey, TAMS Consultants, Inc.,
403322 Ms. Celeste Foster, TAMS Consultants, Inc., from
Ms. Helen Chernoff, Environmental Scientist, TAMS
Consultants, Inc., re: FWD: Confidential-
Queensbury data, July 27, 2001.

P. 403328 - Preliminary Memorandum to Hudson River File, from

403339	Mr. John Szeligowski, TAMS Consultants, Inc., re:
Hudson River Site Inspection, 2/9/00 to 2/11/00,
February 14, 2000.

P. 403340 - E-mail to Edward_Fitzgerald@cpr.ca>, re: Rate Request,
May 31, 2000.

P. 403341 - Memorandum to Hudson River File, from Mr. John

403343	Szeligowski, TAMS Consultants, Inc., re: Phone
Conversation Notes (3/26/01), Sam Borees, USEPA
Region V, Fox River and Pine River, Hudson River
FS Project, March 29, 2001.

P. 403344 - E-mail to Mr. Bruce Fidler, TAMS Consultants,

403344	Inc., Mr. Edward Garvey, TAMS Consultants, Inc.,
Mr. Tariq Ahmed, TAMS Consultants, Inc., from Mr.
John Szeligowski, TAMS Consultants, Inc., re:

Odor, April 12, 2001.

65


-------
P. 403345 - Memorandum to Hudson File, from Mr. John

403350 Szeligowski, TAMS Consultants, Inc., re: Phone
Conversation, CPR - May 17, 2001, May 18, 2001.

P. 403351 - Memorandum to Mr. John Szeligowski, TAMS

403352 Consultants, Inc., from Mr. John Robinson, re:
Discussion with Canal Corp., May 25, 2001.

P. 403353 - Memorandum to Hudson River File, from Ms. Jennifer

403354	Higgins and Mr. John Szeligowski, TAMS
Consultants, Inc., re: Saginaw River, June 12,
2001.

P. 403355 - Record of telephone conversation between Mr.

403355	Andrew Parker, TAMS Consultants, Inc. and Ms.
Jennifer Merling, Prudential Manor Homes Real
Estate, re: Prices of Hudson River-front property,
June 21, 2 0 01.

Feasibility Study References

P. 403356 - Report: HAZCON Solidification Process,

	4 0 3404 Douglassville, PA, Applications Analysis Report,

prepared by U.S. EPA, May 1989.

P. 403405 - Record of telephone conversation with Mr. Paul
403405 dePercin, Project Manager, Funderburk &

Associates, prepared by TAMS Consultants, Inc.,
re: Hudson River FS, August 26, 1999.

P. 403406 - Record of telephone conversation with Mr. Raymond
403409 Funderburk, Funderburk & Associates, prepared by

Ms. Jennifer Higgins, Environmental Engineer, TAMS
Consultants, Inc., re: Hudson River FS, August 30,
1999.

P. 403410 - Letter (w/attachment) to Mr. Bruce Fidler, TAMS
403415 Consultants, Inc., from Mr. David E. Merrill,

Program Manager, Gradient Corporation, re: Hudson
River PCBs Reassessment RI/FS, USACE KC District
Contract #: DACW41-D-98-9002 - Task Order #7, Task
2-A.l Development of Preliminary Target
Contaminant Concentration Ranges, September 29,
1999.

P. 403416 - Memorandum to Mr. Le Thai, Mr. Maheyar Bilimoria

403417 and Mr. Bruce Fidler, TAMS Consultants, Inc., from
Ms. Jennifer Higgins, Environmental Engineer, TAMS

66


-------
Consultants, Inc., re: Update of Technology
Evaluation, March 21, 2000.

P. 403418 - E-mail to , from Mr. Peter Nye,
403419 New York State Department of Environmental

Conservation, re: Hudson River, August 8, 2000.

P. 403420 - Memorandum to Mr. John Szeligowski, TAMS

403421 Consultants, Inc., from Mr. John Robinson, re:

Discussion with Canal Corporation, May 25, 2001.

P. 403422 - References for Table 4-14 of the FS (capacity of
403513 non-TSCA landfills). (Attachments: (1) Record of
telephone conversation with Mr. David Ardito, ECDC
Facility, Safety-Kleen, prepared by Ms. Jennifer
Higgins, Environmental Engineer, TAMS Consultants,
Inc., re: Hudson River FS, September 1, 1999; (2)
Record of telephone conversation with Mr. Ken
Berard, Pinewood Facility, Safety-Kleen, prepared
by Ms. Jennifer Higgins, Environmental Engineer,
TAMS Consultants, Inc., re: Hudson River FS,
September 3, 1999; (3) Facsimile to Ms. Jennifer
Higgins, Environmental Engineer, TAMS Consultants,
Inc., from Mr. John England, State of Connecticut
Department of Environmental Protection, re: State
of CT - Active Landfill Sites, November 22, 1999;
(4) Report: Vermont Solid Waste Management
Facilities, March 1999, prepared by Solid Waste
Management Program, Waste Management Division,
March 30, 1999; (5) Facsimile to Ms. Jennifer
Higgins, Environmental Engineer, TAMS Consultants,
Inc., from Ms. Carole Cifrino, Maine Department of
Environmental Protection, re: State of Maine
Operating Landfills, October 14, 1999; (6)
Facsimile to Ms. Jennifer Higgins, Environmental
Engineer, TAMS Consultants, Inc., from West
Virginia Division of Environmental Protection, re:
Landfill List, December 2, 1999; (7) Table 4-14:
List of Disposal Facilities, Non-TSCA Approved
Landfills, December 20, 1999; (8) Memorandum to
Hudson Team, from Ms. Jennifer Higgins,
Environmental Engineer, TAMS Consultants, Inc.,
re: Hudson FS - Landfill, March 22, 2000; (9)
Record of telephone conversation with Ms. Josianne
Lemay and Ms. Stephanie Lemay, prepared by Ms.
Kathleen Nontour, TAMS Consultants, Inc., re:
Hudson River FS, March 22, 2000; (10) Facsimile
(w/attachments) to Mr. John Szeligowski, TAMS

67


-------
Consultants, Inc., from Mr. Bruce Fidler, TAMS
Consultants, Inc., March 17, 2000; (11) Record of
leaving message for Mr. Tony Lemme, prepared by
TAMS Consultants, Inc., March 23, 2000; (12) Notes
of August 24, 1999; (13) Record of telephone
conversation with Mr. George Stalher, New York
State Department of Environmental Conservation,
prepared by Ms. Jennifer Higgins, Environmental
Engineer, TAMS Consultants, Inc., re: Hudson River
FS - Landfill for PCB Disposal, August 24, 1999;
(14) Notes of December 22, 1999; (15) Notes
(w/attachment), re: CECOS Landfill, message left
for Mr. Ron Ball, BFI Waste Systems of North
America, March 23, 2000; (16) Notes on Non-TSCA
Landfills, April 12, 2000; (17) Facsimile to Ms.
Jennifer Higgins, Environmental Engineer, TAMS
Consultants, Inc., from Mr. Paul Benedum, West
Virginia Division of Environmental Protection, re:
WV MSW Landfill list, April 13, 2000; (18)
Memorandum to Mr. Bruce Fidler, TAMS Consultants,
Inc., from Mr. John Szeligowski, TAMS Consultants,
Inc., re: Landfill Costs +50 ppm PCB, April 17,
2000; (19) Notes on West Virginia Non-TSCA
Landfills, April 17, 2000; (20) Notes on Non-TSCA
Landfills, April 17, 2000; (21) Notes on Waste
Control Specialist, May 5, 2000; (22) Memorandum
to Hudson River File, from Mr. John Szeligowski,
TAMS Consultants, Inc., re: Landfill/Rail Costs,
June 7, 2000; (23) Facsimile letter to Mr. John
Szeligowski, TAMS Consultants, Inc., from Mr.
William W. Gay, Director of Marketing, ECDC/WSG
(New York), re: Preliminary Pricing for
Contaminated Dredge Spoils, June 12, 2000; (24)
Memorandum to Mr. Bruce Fidler, TAMS Consultants,
Inc., from Ms. Jennifer Higgins, Environmental
Engineer, TAMS Consultants, Inc. and Mr. John
Szeligowski, TAMS Consultants, Inc., re:
Conversations with Landfill, September 22, 2000;
(25) Report: Non-TSCA Landfills, April 12, 2000;
(2 6) Table 4-x: List of Disposal (Off-Site)
Facilities, Active Solid Waste Landfills in NYS
and States Surrounding the Hudson River AOC*,
undated.)

White Paper References

P. 403514 - E-mail to

68


-------
403516	"aclorefi@gw.dec.state.ny.us"@TAMS_NY.GWIA, from
Mr. Michael Kane, Biologist, New York State
Department of Environmental Conservation, re:
NYSDEC Hudson River Biota Database, February 12,
2001. (Attachments: 2 Disks, NYSDEC Hudson River
Biota Database zip files, February 12, 2001.)

P. 403517 - E-mail to Ms. Helen Chernoff, Environmental

403517	Scientist, TAMS Consultants, Inc.; Ms. Alison
Hess, Project Manager, U.S. EPA, Region II; Mr.
Douglas Tomchuk, Project Manager, U.S. EPA, Region
II; Ms. Trina Von Stackelburg, Menzie-Cura &
Associates, Inc., Clair Hunt, TAMS Consultants,
Inc., from Edward Garvey, Ph.D., P.G., TAMS
Consultants, Inc., re: Conversation with K.
Farley-2nd attempt, February 22, 2001.

P. 403518 - E-mail to Mr. John Szeligowski, TAMS Consultants,

403520 Inc., from Mr. Richard F. Thomas, Gahagen and
Bryant Associates, Inc., re: Noise on 1000HP
dredge engines, March 26, 2001.

P. 403521 - E-mail to Ms. Helen Pang, TAMS Consultants, Inc.,

403522	from Mr. Ronald V. Allen, Information Specialist,
U.S. Geological Survey, re: Water quality data,
water years 1985-1999, for three Hudson River
Stations: 01327750, 01331095, 01335770, May 30,
2001. (Attachment: Disk containing subject data
files.)

P. 403523 - Facsimile to Mr. Tariq Ahmed, TAMS

403523	Consultants, Inc., from Fang Yang, TAMS
Consultants, Inc., re: Fuel Consumption Estimates,
June 1, 2001.

P. 403524 - E-mail (w/attachments) to Ms. Jennifer Higgins,

403530	Environmental Engineer, TAMS Consultants, Inc.,
from Mr. Colby Snyder, TAMS Consultants, Inc., re:
Conversion from diesel to electric, June 15, 2001.

P. 403531 - Personal Communication: B. Kotas, Northeast

403531	Analytical, re: Standard EPA Method 8082 and Green
Bay Extraction Model, June 15, 2001.

P. 403532 - Memorandum to Hudson River File, from Ms. Helen

403532	Pang, TAMS Consultants, Inc., re: Manistique River
and Harbor Project, June 22, 2001.

69


-------
P. 403533 -
403533

Memorandum to Hudson River File, from Ms. Helen
Pang, TAMS Consultants, Inc., re: Cumberland Bay,
June 26, 2001.

P. 403534 - E-mail to Ms. Jennifer Higgins, Environmental

403536	Engineer, TAMS Consultants, Inc., from Mr. Rod
MacDonald, President, Noise Solutions, Inc., re:
Excavator Noise Suppression Equipment, July 9,
2001.

P. 403537 - E-mail to "jszeligowski@tamsconsultants.com", from

403537	Mr. Robert Simeone, U.S. Army Corps of Engineers,
re: New Bedford Harbor, July 23, 2001.

P. 403538 - E-mail (w/attachments) to Mr. Daniel Forger, U.S.

403543 EPA, Region II, and

"jszeligowski@tamsconsultants.com", from Ms. Anne
Kelly, U.S. EPA, Region II, re: GM Excel
Spreadsheet - 95 sediment sampling, July 24, 2001.

P. 403544 - E-mail to Ms. Jennifer Higgins, Environmental

403545	Engineer, TAMS Consultants, Inc., from Mr. Rod
MacDonald, President, Noise Solutions, Inc., re:
Noise Suppression of Excavators, August 2, 2001.

P. 403546 - Memorandum to Hudson River File, from Ms. Helen

403546	Pang, TAMS Consultants, Inc., re: Cumberland Bay,
September 12, 2001.

P. 403547 - Facsimile to Ms. Helen Pang, TAMS Consultants,

403552 Inc., from Ms. Pamela Tames, U.S. EPA, Region II,
re: Requested information, October 11, 2001.
(Attachments: (1) Table 10, Cadmium
Bioaccumulation Data; (2) Table 9, Cadmium
Concentrations (mg/kg), Biological Tissue
Samples.)

6.0 STATE COORDINATION

6.2 State Certification of Applicable or Relevant and
Appropriate Requirements

P. 600048 - Letter to Mr. William Ports, P. E., Division of
600049 Hazardous Waste Remediation, New York State

Department of Environmental Conservation, from Mr.
Douglas J. Tomchuk, Project Manager, Eastern New
York/Caribbean Section II, U.S. EPA, Region II,

70


-------
re: Hudson River PCBs Site - State ARARs, April
21, 1994.

P. 600050 - Letter (w/attachments) to Mr. Douglas Tomchuk,
600069 Remedial Project Manager, U.S. EPA, Region II,

from Mr. William T. Ports, P.E., Project Manager,
Division of Hazardous Waste Remediation, New York
State Department of Environmental Conservation,
re: Hudson River Reassessment RI/FS, Site No.: 5-
46-031, June 20, 1995.

P. 600070 - Letter to Mr. William T. Ports, P. E., Division of
600072 Environmental Remediation, New York State

Department of Environmental Conservation, from Ms.
Alison A. Hess, C.P.G., Project Manager Hudson
River PCBs Site, U.S. EPA, Region II, re: Hudson
River PCBs Site - State ARARs and TBCs, November
19, 1999.

P. 600073 - Letter (w/attachments) to Ms. Alison Hess,

600087 Remedial Project Manager, U.S. EPA, Region II,

from Mr. Williams T. Ports, P.E., Project Manager,
Division of Environmental Remediation, New York
State Department of Environmental Conservation,
re: Hudson River PCB Reassessment RI/FS, January
24, 2000.

6.3 Correspondence

P. 600001 - Letter to Mr. Bruce K. Means, Chair, U.S. EPA,

600003	from Mr. John P. Cahill, New York State Department
of Environmental Conservation, re: Summary of New
York State's comments on the Hudson River
Reassessment and U.S. EPA Region 2's preferred
alternative, November 14, 2000.

P. 600004 - Letter to Douglas Fischer, Esq., Office of

600004	Regional Counsel, U. S. EPA, Region II, from Mr.
David Keehn, Associate Attorney, New York State
Department of Environmental Conservation, re:
NYSDEC's November 14, 2000 letter to the EPA
National Remedy Review Board regarding the Hudson
River PCBs Superfund Site, December 8, 2000.

P. 600005 - Letter to Mr. Michael J. O'Toole, Jr., P.E.,

600006 Director, Division of Hazardous Waste Remediation,
New York State Department of Environmental

71


-------
Conservation, from Mr. Richard L. Caspe, P.E.,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Hudson River
PCBs Site - Reassessment RI/FS, November 19, 1990.

P. 600007 - Letter (w/attachments) to Ms. Carol Peterson,

600012 Branch Chief, NY/Caribbean Superfund Branch, U.S.

EPA, Region II, from Mr. Stephen B. Hammond, P.E.,
Director, Bureau of Central Remedial Action,
Division of Hazardous Waste Remediation, New York
State Department of Environmental Conservation,
re: Hudson River PCB Sediments, Site No.: 5-46-
031, Reassessment of the 1984 ROD, May 7, 1991.

P. 600013 - Letter to Mr. Douglas Tomchuk, Hudson River PCBs
600014 Site Project Manager, U.S. EPA, Region II, from

Mr. John Davis, Environmental Scientist, New York
State Department of Law, re: Hudson River PCB
Reassessment - Phase I RI Report, September 18,
1991.

P. 600015 - Letter to Ms. Kathleen C. Callahan, Director,

600016 Emergency & Remedial Response Division, U.S. EPA,
Region II, from Mr. Michael J. O'Toole, Jr., P.E.,
Director, Division of Hazardous Waste Remediation,
New York State Department of Environmental
Conservation, re: Hudson River PCB Reassessment
RI/FS, Site No.: 5-46-031, November 8, 1991.

P. 600017 - Memorandum to File, from Mr. Douglas Fischer,

600019 Office of Regional Counsel, U.S. EPA, Region II,
re: NY State Data, re: Hudson River Damage
Assessment Floodplain Soil and Biota Screening,
April 5, 2001. (Attachment: CD - ROM: HR Data,
prepared by Mr. David Keehn, Attorney, New York
State Department of Environmental Conservation,
March 30, 2001. )

P. 600020 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region
600034 II, from Mr. John R. Dergosits, P.E., Canal
Environmental Engineer, Canal Operations and
Maintenance, New York State Canal Corporation, re:
Hudson River Reassessment, September 22, 1997.
(Attachments: (1) List of Champlain Canal areas
requiring dredging for navigational use, (2) New
York State Canal System Cruising Guide Champlain
Canal Maps.)

72


-------
P. 600035 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region
600036 II, from Mr. John R. Dergosits, P.E., Canal
Environmental Engineer, Canal Operations and
Maintenance, New York State Canal Corporation, re:
Hudson River Reassessment, September 22, 1997.
(Attachment: (1) List of Champlain Canal areas
requiring dredging for navigational use.)

P. 600037 - Memorandum to Distribution from Ron Sloan, re:

600041 Error in Table Submitted with the January 25, 2000
letter, January 27, 2000. (Attachment: Letter to
Ms. Allison Hess, U.S. EPA, Region II, from Ronald
Sloan, Ph.D., Research Scientist, New York State
Department of Environmental Conservation, re:
enclosed summary table (Blue Ledge and Sherman
Island Pool Temporal PCB (ppm) Table) intended to
provide additional perspective on fish PCB levels
in the upper Hudson River.)

P. 600042 - Letter (with attachments) to Mr. Richard L. Caspe,
600045 Director, Emergency & Remedial Response Division,
U.S. EPA, Region II, from Mr. Michael J. O'Toole,
Jr., Director, Division of Environmental
Remediation, New York State Department of
Environmental Conservation, re: GE Hudson Falls,
December 11, 2000.

P. 600046 - Press Release: DEC: Mammals, Soil Near Hudson
600047 River Have Elevated PCB Levels, Preliminary

Findings Indicate River PCBs May Be Affecting
Wildlife, prepared by New York State Department of
Environmental Conservation, April 2, 2001.

P. 600088 - Letter to The Honorable Christine T. Whitman,

600089 Administrator, U.S. EPA, from George E. Pataki,

Governor, State of New York, re: Hudson River PCBs
Site, August 1, 2001.

P. 600090 - Letter to Honorable Christine Todd Whitman,

600091 Administrator, U.S. EPA, from Mr. Eliot Spitzer,

re: Concerns regarding possibility of insertion of
performance standards in the Record of Decision,
October 4, 2001. (NOTE: This document is
CONFIDENTIAL. It can be located in the Superfund
Records Center at 290 Broadway - 18th Floor, N.Y.,
N.Y. 10007-1866.)

73


-------
P. 600092 - Letter to Honorable Christine Todd Whitman,

600094 Administrator, U.S. EPA, from Ms. Erin M. Crotty,
Commissioner, New York State Department of
Environmental Conservation, re: State's concerns
regarding statements made regarding performance
criteria, October 24, 2001. (NOTE: This document
is CONFIDENTIAL. It can be located in the
Superfund Records Center at 290 Broadway - 18th
Floor, N.Y., N.Y. 10007-1866.)

P. 600095 - Letter to Honorable Jane M. Kenny, Regional

600098 Administrator, U.S. EPA, Region II, from Ms. Erin
M. Crotty, Commissioner, New York State Department
of Environmental Conservation, re: State review of
December 20, 2001 EPA Superfund Record of
Decision, Hudson River PCBs Site, Hudson Falls to
New York City, New York, December 21, 2001.

7.0	ENFORCEMENT

7.1	Enforcement History

P. 700001 - Memorandum - Decision and Order, United States
700026 District Court, Northern District of New York,

Farmers Against Irresponsible Remediation (FAIR)
by its President Charles Hanehan; Charles Hanehan;
Willard H. Peck; Steven P. Griffen; Thomas Kugler;
and Sean Quinn, Plaintiffs, against United States
Environmental Protection Agency and Christine Todd
Whitman, Administrator of the United States
Environmental Protection Agency, Defendants. New
York Farm Bureau, Inc., Amicus Curiae. 01-CV-1183,
(LEK) (DEP), filed September 20, 2001.

7.7 Notice Letters and Responses - 104e's

P. 700027 - Letter to Mr. John F. Welch, Jr., Chief Executive
700029 Officer, General Electric Company, from Mr.

William J. Librizzi, Director, Office of Emergency
and Remedial Response, U.S. EPA, Region II, re:
Hudson River PCB Contamination, Hudson Falls, New
York, October 27, 1983.

8.0 HEALTH ASSESSMENTS

74


-------
8.1 ATSDR Health Assessments

001-0047-0047 Memorandum to Herb King, U.S. EPA, from William
Nelson, Agency for Toxic Substances & Disease
Control, forwarding the enclosed Preliminary
Health Assessment for the Hudson River PCBs Site,
New York, April 25, 1989.

001-0048-0063 Report: Health Assessment for the Hudson River PCB
NPL Site, New York, prepared by the Agency for
Toxic Substances & Disease Control, April 17,

1989.

001-0064-0064 Memorandum to Barry L. Johnson, Agency for Toxic

Substances & Disease Control from Gregory Ulirsch,
Agency for Toxic Substances & Disease Control, re:
visit to the Hudson River PCBs Site, September 19,
1988 .

P. 800001 - Official 1990 U.S. Census Form, prepared by Bureau
800073 of the Census, United States Department of

Commerce, 1990. (Attachments: (1) Report: The
Census Means Business, prepared by Mr. Joe
Schwartz, Associate Editor, American Demographics,
July 1989; (2) Summary Tape File (STF) 3, A First
Look at 1990 Census Sample Data, prepared by
Bureau of the Census, United States Department of
Commerce, May 19 92; (3) Report: County to County
Out-Migration Flow Files, Summary of (Total) Out-
Migration from Countv/MCD, Saratoga County, New
York, undated; (4) Report: Geographical Mobility:
March 1986 to March 1987, prepared by Bureau of
the Census, United States Department of Commerce,
undated; (5) Mobility Tables.)

P. 800074 - Report: Hudson River Angler Survey, A Report on
800145 the Adherence to Fish Consumption Health

Advisories Among Hudson River Anglers, prepared by
Ms. Bridget Barclay, Hudson River Sloop
Clearwater, Inc., March 1993.

P. 800146 - Report: Site Review and Update, Hudson River
800178 PCBs, Glens Falls, Warren County, New York,

prepared by New York State Department of Health,
Under a Cooperative Agreement with Public Health
Service, Agency for Toxic Substances and Disease
Registry, Division of Health Assessment and
Registry, United States Department of Health and

75


-------
Human Services, September 30, 1993, revised March
31, 1994.

P. 800179 - Report: Site Review and Update, Hudson River
800206 PCBs, Glens Falls, Warren County, New York,

prepared by New York State Department of Health,
Under a Cooperative Agreement with Public Health
Service, Agency for Toxic Substances and Disease
Registry, Division of Health Assessment and
Registry, United States Department of Health and
Human Services, September 30, 1993, revised March
31, 1994.

P. 800207 - Report: Report on Peer Review Workshop on PCBs:

800365 Cancer-Dose Response Assessment and Application to
Environmental Mixtures, prepared by National
Center for Environmental Assessment, Office of
Research and Development, U.S. EPA, May 1996.

P. 800366 - Report: Risk-Based Approach for PCB's Fish

800389 Consumption Advisories in Connecticut, prepared by
Mr. Brian Toal, M.S.P.H., Director of Toxic
Hazards Assessment, and Gary Ginsberg, Ph.D.,
Toxicologist, Environmental Epidemiology &
Occupational Health, Connecticut Department of
Public Health, May 1999.

P. 800390 - Report: New York State Department of Health,

800409 Health Advisories, Chemicals in Game and

Sportfish, 1999-2000, prepared by Division of
Environmental Health Assessment, New York State
Department of Health, June 10, 1999.

P. 800410 - Press Release: From the Commissioner, Health

	8 0 0411 Department Issues 1999/2000 Fish Advisories for

Recreational Anglers, prepared by Department of
Health, State of New York,

www.health.state.ny.us/nysdoh/commish/9 9/fishl9 9 9_
2000.htm, June 1999; printed June 30, 1999.

P. 800412 - Facsimile to Ms. Alison A. Hess, U.S.

800416 EPA, Region II, from Mr. Gary Ginsberg, Division
of Environmental Epidemiology and Occupational
Health, Department of Public Health, State of
Connecticut, re: Advisory Press Release, July 12,
1999. (Attachment: Press Release: DPH Issues 1999
Connecticut Fish Consumption Advisory, prepared by

76


-------
Connecticut Department of Public Health, June 7,
1999. )

P. 800417 - Report: Health Consultation: 1996 Survey of Hudson
800483 River Anglers, Hudson Falls to Tappan Zee Bridge,
at Tarrvtown, New York, prepared by Center for
Environmental Health, New York State Department of
Health, prepared for Public Health Service, Agency
for Toxic Substances and Disease Registry,

Division of Health Assessment and Registry, United
States Department of Health and Human Services,
February 10, 2000.

P. 800484 - Report: Hudson River PCB Site: Health Statistics
800533 Review, Town of Waterford, Saratoga County,

prepared by Center for Environmental Health, New
York State Department of Health, prepared for
United States Agency for Toxic Substances and
Disease Registry, March 2000.

P. 800534 - Memorandum to Ms. Alison A. Hess, U.S. EPA,

800538 Region II, and Ms. Marian Olsen, U.S. EPA, Region
II, from Mr. David Merrill, Gradient Corporation,
re: NYS Fishing License Info, October 11, 2000.
(Attachment: Table: New York State Department of
Environmental Conservation, Resident and
Nonresident Hunting, Fishing and Trapping Licenses
by Type, New York State by County, prepared by New
York State Department of Environmental
Conservation, February 9, 2000.)

P. 800539 - Fact Sheet: Eating Sport Fish 2000-2001 Health

	8 0 0542 Advice for the Capital District, Hudson River, New

York Harbor, Fresh Waters of Long Island and
Marine Waters of New York, prepared by New York
State Department of Environmental Conservation and
the New York State Department of Health, 2000 -
2001.

8.2 Toxicological Profiles

P. 800543 - Report: Risk Assessment in a Federal Regulatory

800554 Agency: an Assessment of Risk Associated with the
Human Consumption of Some Species of Fish
Contaminated with Polvchlorinated Biphenvls
(PCBs), prepared by Mr. Frank Cordle, Epidemiology
and Clinical Toxicology Unit, HFF-108, Bureau of

77


-------
Foods, Food and Drug Administration, Mr. Raymond
Locke, Epidemiology and Clinical Toxicology Unit,
HFF-108, Bureau of Foods, Food and Drug
Administration, Ms. Janet Springer, Epidemiology
and Clinical Toxicology Unit, HFF-108, Bureau of
Foods, Food and Drug Administration, prepared for,
Environmental Health Perspectives, 1982.

P. 800555 - Report: Use of Epidemiology and Clinical

800577 Toxicology to Determine Human Risk in Regulating
Polvchlorinated Biphenvls in the Food Supply,
prepared by Mr. Frank Cordle, Epidemiology and
Clinical Toxicology Unit, HFF-108, Bureau of
Foods, Food and Drug Administration, prepared for,
Regulatory Toxicology and Pharmacology, May 10,
1983.

P. 800578 - Fact Sheet: Hazardous Substance Fact Sheet,

	800583 Polvchlorinated Biphenvls, prepared by New Jersey

Department of Health and Senior Services, February
1989.

P. 800584 - Report: Bladder Cancer and Employment in the
800628 Pittsfield Massachusetts Area II: A Follow-up
Survey of Bladder Cancer Cases, prepared by
Massachusetts Department of Public Health, Bureau
of Health Statistics, Research and Evaluation,
Massachusetts Department of Labor and Industries,
Division of Occupational Hygiene, and National
Institute for Occupational Safety and Health,

June 1989.

P. 800629 - Report: Reassessment of Liver Findings in Five PCB
800856 Studies in Rats, prepared by the Institute for

Evaluating Health Risks, prepared for, U.S. EPA,
July 1, 1991.

P. 800857 - Report: Effects of the Health Advisory and
800993 Advisory Changes on Fishing Habits and Fish

Consumption in New York Sport Fisheries, prepared
by Ms. Nancy A. Connelly, Human Dimensions
Research Unit, Department of Natural Resources,
College of Agriculture and Life Sciences, Cornell
University, Ms. Barbara A. Knuth, Human Dimensions
Research Unit, Department of Natural Resources,
College of Agriculture and Life Sciences, Cornell
University, and Ms. Carole A. Bisogni, Division of
Nutritional Sciences, College of Human Ecology,

78


-------
Cornell University, prepared for New York Sea
Grant Institute, September 1992.

P. 800994 - Report: Mortality Among Workers Exposed to

801003 Polvchlorinated Biphenvls, prepared by Mr. Thomas
Sinks, Division of Surveillance, Hazard
Evaluations, and Field Studies, National Institute
for Occupational Safety and Health; Mr. Gregory
Steele, Environmental Epidemiology Section,
Epidemiology Resource Center, Indiana State
Department of Health; Mr. Alexander B. Smith,
Division of Surveillance, Hazard Evaluations, and
Field Studies, National Institute for Occupational
Safety and Health; Ms. Kathy Watkins, Division of
Surveillance, Hazard Evaluations, and Field
Studies, National Institute for Occupational
Safety and Health, and Ms. Ruth A. Shults,

Division of Surveillance, Hazard Evaluations, and
Field Studies, National Institute for Occupational
Safety and Health, prepared for American Journal
of Epidemiology, 1992.

P. 801004 - Fact Sheet: ATSDR, Polvchlorinated Biphenyls,

	801005 prepared by Agency for Toxic Substances and

Disease Registry, Public Health Service, United
States Department of Health and Human Services,
April 1993.

P. 801006 - Report: Toxicoloqical Consequences of Aroclor 1254
801023 Ingestion by Female Rhesus (Macaca mulatta)
Monkeys. Part 2. Reproduction and Infant
Findings, prepared by D.L. Arnold, Toxicology
Research Division, Bureau of Chemical Safety, Food
Directorate, Health Protection Branch, Health
Canada; F. Bryce, Toxicology Research Division,
Bureau of Chemical Safety, Food Directorate,

Health Protection Branch, Health Canada; P.F.
McGuire, Toxicology Research Division, Bureau of
Chemical Safety, Food Directorate, Health
Protection Branch, Health Canada; R. Stapley,
Bureau of Biostatistics and Computer Applications,
Food Directorate, Health Protection Branch, Health
Canada; J.R. Tanner, Toxicology Research Division,
Bureau of Chemical Safety, Food Directorate,

Health Protection Branch, Health Canada; E.
Wrenshall, Toxicology Research Division, Bureau of
Chemical Safety, Food Directorate, Health
Protection Branch, Health Canada; J. Mes, Food

79


-------
Research Division, Bureau of Chemical Safety, Food
Directorate, Health Protection Branch, Health
Canada; S. Fernie, Toxicology Research Division,
Bureau of Chemical Safety, Food Directorate,

Health Protection Branch, Health Canada; H.
Tryphonas, Toxicology Research Division, Bureau of
Chemical Safety, Food Directorate, Health
Protection Branch, Health Canada; S. Hayward,
Bureau of Biostatistics and Computer Applications,
Food Directorate, Health Protection Branch, Health
Canada; and S. Malcolm, Bureau of Biostatistics
and Computer Applications, Food Directorate,

Health Protection Branch, Health Canada; prepared
for Food and Chemical Toxicology, January 6, 1995.

P. 801024 - Report: Determining the Intake of Upper Hudson
801038 River Fish By Species, prepared by ChemRisk

Division, McLaren/Hart Environmental Engineering
Corp., prepared for General Electric Company,
January 1995.

P. 801039 - Report: Evaluating the Impact of Cooking Processes
801072 on the Level of PCBs in Fish, prepared by ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., prepared for General Electric Company,
January 1995.

P. 801073 - Report: Estimating Fish Consumption Rates for the
801140 Upper Hudson River, prepared by ChemRisk Division,
McLaren/Hart Environmental Engineering Corp.,
prepared for General Electric Company, January
1995.

P. 801141 - Letter to Mr. Bryan Olson, Waste Management

801162 Division, U.S. EPA, Region I, from Mr. Ronald F.

Desgroseilliers, Manager, Area Environmental and
Facility Programs, General Electric Company, re:
Use of Monte Carlo analysis for Risk Assessments
at Pittsfield/Housatonic Sites, May 24, 1995.
(Attachment: Memorandum to EPA Region I and
Massachusetts Department of Environmental
Protection, from Ms. Jane McCrodden, ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., Ms. Ellen Ebert, ChemRisk Division,
McLaren/Hart Environmental Engineering Corp., Mr.
Russell Keenan, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., re: The Role of
Monte Carlo Analysis in Characterizing Uncertainty

80


-------
and Variability in Exposure and Risk Assessment,
May 24, 1995.)

P. 801163 - Report: Hudson River Superfund Project, Approach
801200 for Performing Human Health Risk Assessment:
Estimating Potential PCB Exposure from Fish
Consumption, prepared by ChemRisk Division,
McLaren/Hart Environmental Engineering Corp., May
1995.

P. 801201 - Press Release: Proposed Guidelines for Carcinogen

	801397 Risk Assessment (EPA/600/P-92/003C April 1996),

Abstract, prepared by Office of Research and
Development, National Center for Environmental
Assessment, U.S. EPA, Wysiwyg:

//5/http://www.epa.gov/ncea/raf/cra_prop. htm,
April 23, 1996; printed June 2, 2001.

(Attachment: Report: Guidelines for Carcinogen
Risk Assessment, prepared by Risk Assessment
Forum, U.S. EPA, July 1999.)

P. 801398 - Notice: Reevaluating Cancer Assessments, Federal
801400 Register/ Vol. 61 No. 123, prepared by U.S. EPA,
June 25, 1996.

P. 801401 - Report: PCBs: Cancer Dose-Response Assessment and
801487 Application to Environmental Mixtures, prepared by
National Center for Environmental Assessment,
Office of Research and Development, U.S. EPA,
September 1996.

P. 801488 - Report: IRIS, Integrated Risk Information System,
801503 Aroclor 1016 CASRN 12674-11-2, prepared by U.S.

EPA, http://www.epa.gov/iris/subst/0462.htm,
November 1, 1996; printed March 30, 2001.

P. 801504 - Report: IRIS, Integrated Risk Information System,
801524 Aroclor 1254 CASRN 11097-69-1, prepared by U.S.

EPA, http://www.epa.gov/iris/subst/0389.htm,
November 1, 1996; printed March 30, 2001.

P. 801525 - Report: Public Health Implications of PCB

801545 Exposures, prepared by Agency for Toxic Substances
and Disease Registry, Public Health Service,

United States Department of Health and Human
Services, prepared for U.S. EPA, December 1996.

P. 801546 - Report: References, Review of Studies in Children:

81


-------
801959 Polvchlorinated Biphenvls, Dibenzo-P-Dioxins and
Dibenzofurans, prepared by Renate D. Kimbrough,
M.D., and Martha L. Doemland, Ph.D., Institute for
Evaluating Health Risks, prepared for The Chlorine
Chemistry Council, January 1997.

P. 801960 - Report: Final Report - Chronic Toxicity and
802542 Oncogenicity, Volume I, An Assessment of the

Chronic Toxicity and Oncogenicity of Aroclor -
1016, Aroclor 1242, Aroclor 1254, and Aroclor 1260
Administered in Diet to Rats, prepared by Mr.
Michael J. Brunner, Battelle Laboratories, Mr.
Timothy M. Sullivan, Battelle Laboratories, Mr.
Allen W. Singer, Battelle Laboratories, Mr.

Michael J. Ryan, Battelle Laboratories, Mr. John
D. Toft, II, Battelle Laboratories, Mr. Ronald S.
Menton, Battelle Laboratories, Mr. Steven W.
Graves, Battelle Laboratories, and Mr. Arthur C.
Peters, Battelle Laboratories, prepared for
Environmental Research Center, General Electric
Company, February 1997.

P. 802543 - Report: Final Report - Chronic Toxicity and

803035 Oncogenicity, Volume II, An Assessment of the
Chronic Toxicity and Oncogenicity of Aroclor -
1016, Aroclor 1242, Aroclor 1254, Aroclor 1260
Administered in Diet to Rats, prepared by Mr.
Michael J. Brunner, Battelle Laboratories, Mr.
Timothy M. Sullivan, Battelle Laboratories, Mr.
Allen W. Singer, Battelle Laboratories, Mr.

Michael J. Ryan, Battelle Laboratories, Mr. John
D. Toft, II, Battelle Laboratories, Mr. Ronald S.
Menton, Battelle Laboratories, Mr. Steven W.
Graves, Battelle Laboratories, and Mr. Arthur C.
Peters, Battelle Laboratories, prepared for
Environmental Research Center, General Electric
Company, February 1997.

P. 803036 - Report: Exposure to Polvchlorinated Biphenvls in
803042 Residential Indoor Air and Outdoor Air Near a

Superfund Site, prepared by Ms. Donna J. Vorhees,
Harvard School of Public Health, Department of
Environmental Health, Environmental Science &
Engineering Program; Ms. Alison C. Cullen, Harvard
School of Public Health, Department of
Environmental Health, Environmental Science &
Engineering Program and University of Washington,
the National Research Center for Statistics and

82


-------
the Environment, Graduate School of Public
Affairs; Ms. Larisa M. Altshul, Harvard School of
Public Health, Department of Environmental Health,
Environmental Science & Engineering Program,
prepared for Environmental Science and Technology,
1997 .

>03043 - Report: A Position Paper of the American Council
>03069 on Science and Health: Public Health Concerns
about Environmental Polvchlorinated Biphenvls
(PCBs), prepared by Leonard T. Flynn, Ph.D.,
M.B.A. and Ms. Cindy F. Kleiman, M.P.H., Project
Coordinator, http://acsh.org/publications/reports/
pcupdate2.html, 1997; printed July 1, 1998.

3 0 3 0 7 0 - Report: IRIS, Integrated Risk Information System,
>03084 Polvchlorinated Biphenvls (PCBs) CASRN 1336-36-3
(06/01/1997), prepared by U.S. EPA,
http://www.epa.gov/iris/subst/02 94.htm, June 1,
1997; printed November 21, 2000.

>03085 - Report: A Probabilistic Framework for the
>03119 Reference Dose, (Probabilistic RfD), prepared by
Mr. Jeffrey C. Swartout, National Center for
Environmental Assessment, U.S. EPA; Mr. Paul S.
Price, McLaren/Hart-ChemRisk; Mr. Michael L.
Dourson, Toxicology Excellence for Risk
Assessment, and Mr. Russell E. Keenan,
McLaren/Hart-ChemRisk, prepared for Risk Analysis,
June 10, 1997.

>03120 - Fact Sheet: Should I Eat the Fish I Catch, A
>03123 Guide to Healthy Eating of the Fish You Catch,

prepared by the Office of Science and Technology,
U. S. EPA, and the Agency for Toxic Substances and
Disease Registry, United States Public Health
Service, September 1997.

>03124 - Report: Comparative Carcinogenicity in Sprague-
>03138 Dawlev Rats of the Polvchlorinated Biphenvl

Mixtures Aroclors 1016, 1242, 1254, and 1260,
prepared by B.A. Mayes, General Electric Corporate
Research & Development; E.E. McConnell, ToxPath
Inc.; B.H. Neal, Jellinek, Schwartz, and Connelly,
Inc.; M.J. Brunner, Battelle Laboratories; S.B.
Hamilton, General Electric Company; T.M. Sullivan,
Battelle Laboratories; A.C. Peters, Battelle
Laboratories; M.J. Ryan, Battelle Laboratories; J.

83


-------
D. Toft, Battelle Laboratories; A.W. Singer,
Battelle Laboratories; J.F. Brown Jr., General
Electric Corporate Research & Development; R.G.
Menton, Battelle Laboratories; and J.A. Moore,
Institute for Evaluating Health Risks, prepared
for Toxicological Sciences, 1998.

>03139 - Report: Evaluating Risk Communication: Examining
>03149 Target Audience Perceptions about Four

Presentation Formats for Fish Consumption Health
Advisory Information, prepared by Ms. Nancy A.
Connelly, Human Dimensions Research Unit,
Department of Natural Resources, Cornell
University, and Ms. Barbara A. Knuth, Human
Dimensions Research Unit, Department of Natural
resources, Cornell University, prepared for Risk
Analysis, 1998.

>03150 - Report: Health Effects of Polychlorinated
>03151 Biphenvls (PCBs), Bureau of Toxic Substance

Assessment, Department of Health, State of New
York, prepared for New York State Department of
Environmental Conservation, January 1998.

>03152 - Report: Application of Quantitative Information on
>03186 the Uncertainty in the RFD to Noncarcinogenic Risk
Assessments, prepared by Ms. Heather Carlson-
Lynch, McLaren/Hart-ChemRisk; Mr. Paul S. Price,
McLaren/Hart-ChemRisk; Mr. Jeffrey C. Swartout,
U.S. EPA; Mr. Michael L. Dourson, Formerly of U.S.
EPA; and Mr. Russell E. Keenan, McLaren/Hart-
ChemRisk, prepared for Human and Ecological Risk
Assessment, March 1998.

>03187 - Report: Reprinted from: Environmental Health
>03194 Perspectives, Assessing the Cancer Risk from

Environmental PCBs, prepared by Mr. Vincent James
Cogliano, National Center for Environmental
Assessment, U.S. EPA, prepared for Environmental
Health Perspectives, June 1998.

>03195 - Fact Sheet: Eating Sport Fish 1998 - 1999 Health
>03196 Advice for the Capital District, Hudson River, New
York Harbor, Fresh Waters of Long Island and
Marine Waters of New York, prepared by New York
State Department of Environmental Conservation and
the New York State Department of Health, 1998 -
1999.

84


-------
P. 803197 - Report: Mortality in Male and Female Capacitor

	803207 Workers Exposed to Polvclorinated Biphenvls,

prepared by Renate D. Kimbrough, MD, Institute for
Evaluating Health Risks, Martha L. Doemland,
Ph.D., Institute for Evaluating Health Risks,
Maurice E. LeVois, Ph.D., Institute for Evaluating
Health Risks, prepared for Journal of Occupational
and Environmental Medicine, March 1999.

P. 803208 - Report: Food and Drug Administration Total Diet

	803261 Study Summary of Residues Found Ordered by Food

Market Baskets 91-3-97-1, prepared by Food and
Drug Administration, June 1999.

P. 803262 - Facsimile Sheet to Ms. Alison A. Hess, U.S. EPA,
803277 Region II, from Mr. Jeff Bigler, Standards &
Applied Science Division, Office of Science &
Technology, Office of Water, U.S. EPA, July 13,
1999. (Attachment: Letter (w/ attachments) to
Colleague, from Mr. Robert Perciasepe, Assistant
Administrator, Office of Water, and Ms. Lynn R.
Goldman, M.D., Assistant Administrator, Office of
Prevention, Pesticides and Toxic Substances, U.S.
EPA, re: Reaffirmation of the importance of local
fish consumption advisories and the appropriate
approach for developing and communicating these
advisories, July 9, 1999.)

P. 803278 - Report: Characterization of Potential Endocrine-

	803289 Related Health Effects at Low-Dose Levels of

Exposure to PCBs, prepared by Mr. Abraham Brouwer,
Division of Toxicology, Department of Food
Technology and Nutritional Sciences, Wageningen
Agricultural University and Research Center; Mr.
Matthew P. Longnecker, National Institute of
Environmental Health Sciences; Ms. Linda S.
Birnbaum, Experimental Toxicology Division,
National Health and Environmental Effects Research
Laboratories, U.S. EPA; Mr. James Cogliano,
National Center for Environmental Assessment, U.S.
EPA; Mr. Paul Kostyniak, Toxicology Research
Center, School of Medicine and Biomedical
Sciences, University of Buffalo; Mr. Jack Moore,
Institute for Evaluating Health Risks; Ms. Suzan
Schantz, College of Veterinary Medicine,

University of Illinois at Urbana-Champaign; and
Mr. Gerhard Winneke, University of Duesseldorf,

85


-------
prepared for Environmental Health Perspectives,
August 1999.

>03290 - Report: Summary Report for the Expert Panel Review

>03373 of the Toxicoloqical Profile for PCBs, prepared by
Eastern Research Group, Inc., prepared for
Division of Toxicology, Agency for Toxic
Substances and Disease Registry, December 10,

1999.

>03374 - Report: Aroclor 1242 Inhalation and Ingestion by

>03405 Sprague-Dawlev Rats, prepared by Ms. Ann Casey,

School of Public Health, University of Albany and
St. Regis Mohawk Tribe Environmental Division; Mr.
David F. Berger, Department of Psychology, State
University of New York at Cortland, Mr. John P.
Lombardo, Department of Psychology, State
University of New York at Cortland, Ms. Anne Hunt,
Department of Counseling Psychology, University of
Albany; Mr. Fred Quimby, Department of Veterinary
Pathology, Cornell University, prepared for
Journal of Toxicology and Environmental Health,
1999.

>03406 - Report: PCBs Environmental Considerations,prepared

>03433 by James Cogliano, Ph.D., Chief, Quantitative Risk
Methods Group, National Center for Environmental
Assessment, U.S. EPA, facsimile date March 6,

2000 .

>03434 - Agenda: Colloquium on Approaches to Quantifying

>03442 Health Risks for Threshold or Nonlinear Effects at
Low Dose, prepared by Risk Assessment Forum, U.S.
EPA, September 19, 2000. (Attachments: Topic
summaries.)

>03443 - Letter to Interested Party, from Ms. Suzanne K.

>03510 Gordon, Assistant Commissioner, Bureau of

Environmental Health Assessment, Executive Office
of Health and Human Services, Massachusetts
Department of Public Health, re: Report by panel
of experts on the public health effects and
science of PCBs, October 18, 2000. (Attachment:
Report: Information Booklet for the Meeting
Summary of the Expert Panel on the Health Effects
of Polvchlorinated Biphenvls (PCBs), prepared by
the Bureau of Environmental Health Assessment,
Massachusetts Department of Public Health, funding

86


-------
from the Executive Office of Health and Human
Services, Massachusetts Department of Public
Health and the Agency for Toxic Substances and
Disease Registry, October 2000.)

P. 803511 - Report: Appendix G, CAS Registry Number Index,
803520 prepared by CAS Registry System, http://nte-

server.niehs.nih.gov/htdocs/8_RoC/CAS_AppG.html,
printed May 9, 2001.

P. 803521 - Report: Application of Probabilistic Methods to

	8 0 354 0 Noncarcinoqenic Risk Assessment: A Case Study of

Hexachloroethane and Paraquat, prepared by T.
Harvey, U.S. EPA; R.E. Keenan, McLaren/Hart-
ChemRisk; J.C. Swartout, U.S. EPA; H.L. Carlson-
Lynch, McLaren/Hart-ChemRisk; C.A. Gillis,
McLaren/Hart-ChemRisk; P.S. Price, McLaren/Hart-
ChemRisk, undated.

P. 803541 - Report: Chronic Toxicity of Aroclor Mixtures

	803565 Administered in the Diet to the Spraque-Dawlev

Rats for Twelve Months, prepared by B.A. Mayes,
General Electric Company; B.H. Neal, Jellinek,
Schwartz, and Connelly, Inc.; A.C. Peters,

Battelle Laboratories; S.B. Hamilton, General
Electric Company; E.E. McConnell, Raleigh, North
Carolina; and J.A. Moore, Institute for Evaluating
Health Risks, undated.

P. 803566 - Report: Mortality and Industrial Hygiene Study of

	803575 Workers Exposed to Polvchlorinated Biphenvls,

prepared by Mr. David P. Brown, M.P.H., United
States Department of Health, Education and
Welfare, Public Health Service, Center for Disease
Control, National Institute for Occupational
Safety and Health, Division of Surveillance,

Hazard Evaluations and Field Studies, and Mark
Jones, M.S., United States Department of Health,
Education and Welfare, Public Health Service,
Center for Disease Control, National Institute for
Occupational Safety and Health, Division of
Surveillance, Hazard Evaluations and Field
Studies, prepared for Archives of Environmental
Health, undated.

P. 803576 - Report: PCBs Fish Level Advisories. (Attachments:
803581 Risk-Based Consumption Limit Tables, undated.)

87


-------
P. 804085 - Memorandum to Directors, Waste Management

804087 Division, Region I, IV, V, VII, VIII; Director,
Emergency and Remedial Response Division Region
II; Directors, Hazardous Waste Management Division
Regions III, VI, IX; Directors, Hazardous Waste
Division, Region X, from Mr. William H. Farland,
Director, Office of Health and Environmental
Assessment, and Mr. Henry L. Longest II, Director,
Office of Emergency and Remedial Response, re: Use
of IRIS Values in Superfund Risk Assessment,
December 21, 1993.

P. 804088 - Report: Report from the Workshop on the

	8 04417 Application of 2,3,7,8-TCDD Toxicity Equivalency

Factors to Fish and Wildlife, prepared by Eastern
Research Group, Inc., prepared for Risk Assessment
Forum, U.S. EPA, March 31, 1998.

8.3 Correspondence

P. 803582 - Letter to Mr. James Benson, Acting Commissioner of
803587 Food and Drugs, United States Food and Drug
Administration, from David Axelrod, M.D.,
Commissioner of Health, New York State Department
of Health, re: Request for an evaluation of FDA
tolerance levels for PCBs in fish and the
development of a fish consumption advisory,

October 12, 1990. (Attachment: Table: Chronically
Exposed to Diets Containing Aroclors 1016, 1248,
or 1254, undated.)

P. 803588 - Letter to Mr. Donald Clay, Assistant

803595 Administrator, from Mr. John A. Moore, President,
Institute for Evaluating Health Risks, re: A
project in which the pathological diagnoses in 5
key rat PCB studies were reassessed, July 1, 1991

P. 803596 - Letter to Colleagues, from Mr. Clyde Houseknecht,
803597 Chief, Fish Contamination Section, U.S. EPA, re:

Two recent publications from the U.S. EPA's Office
of Water, October 18, 1993.

P. 803598 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
8037 60 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Striped Bass Fish Consumption Advisory - State

88


-------
of Delaware, August 11, 1994. (Attachments: (1)
Press Release: State Issues Health Advisory on
Delaware Estuary Fish, prepared by Delaware
Department of Natural Resources and Environmental
Control, June 9, 1994; (2) Report: Summary and
Assessment of Polvchlorinated Biphenvls and
Selected Pesticides in Striped Bass from the
Delaware Estuary, prepared by Delaware Department
of Natural Resources and Environmental Control,
March 1994.)

P. 803761 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
803812 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Information relating to Hudson River Risk
Assessment Issues, February 10, 1995.

(Attachments: (1) Report: Estimating Consumption
of Freshwater Fish among Maine Anglers prepared by
Ms. Ellen S. Ebert, ChemRisk Division,

McLaren/Hart Environmental Engineering Corp.; Ms.
Natalie W. Harrington, ChemRisk Division,
McLaren/Hart Environmental Engineering Corp.; Mr.
Kevin J. Boyle, University of Maine, Mr. James W.
Knight, Gradient Corp.; Mr. Russell E. Keenan,
ChemRisk Division, McLaren/Hart Environmental
Engineering Corp., prepared for North American
Journal of Fisheries Management, 1993; (2) Report:
Selection of Fish Consumption Estimates for Use in
the Regulatory Process, prepared by Ms. Ellen S.
Ebert, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp.; Mr. Paul S.

Price, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp.; Mr. Russell E.
Keenan, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., prepared for
Journal of Exposure Analysis and Environmental
Epidemiology, 1994; (3) Report: The Effect of
Sampling Bias on Estimates of Angler Consumption
Rates in Creel Surveys, prepared by Mr. Paul S.
Price, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., Mr. Steve H. Su,
ChemRisk Division, McLaren/Hart Environmental
Engineering Corp., Mr. Michael N. Gray, ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., prepared for Journal of Exposure Analysis
and Environmental Epidemiology, 1994.)

89


-------
P. 803813 - Memorandum (w/ attachments) to Ms. Marian Olsen,
803845 Emergency and Remedial Response Division, U.S.

EPA, Region II, through Mr. Kevin Garrahan, Chief,
Exposure Assessment Group, Exposure Assessment
Applications Branch, U.S. EPA, from Ms. Jackie
Moya, Exposure Assessment Group, U.S. EPA, re:
Review of ChemRisk January 1995 Reports on the
Hudson River Risk Assessment, March 13, 1995.

P. 803846 - Memorandum to Mr. Jeff Bigler, Standards & Applied
803849 Science Division, Office of Science & Technology,
Office of Water, U.S. EPA, from Ms. Helen Jacobs,
U.S. EPA, re: National Estimates of Fish
Consumption by Individuals - Combined CSFII Data,
March 20, 1995 (Attachments: Tables: Average
Daily Per Capita Estimates of Fish Consumption.)

P. 803850 - Memorandum to Mr. Tim Barry, Office of Policy,
803851 Planning and Evaluation, U.S. EPA, and Mr. Paul
White, Office of Research and Development, U.S.
EPA, from Ms. Marian Olsen, Technical Support
Section, U.S. EPA, Region II, re: Review of
Proposed Plan for Micro-Exposure Risk Assessment
for Upper Hudson River Project by ChemRisk, May
15, 1995.

P. 803852 - Memorandum to Ms. Marian Olsen, Technical Support
803855 Section, U.S. EPA, Region II, from Ms. Karen A.

Hammerstrom, Environmental Scientist, Office of
Research and Development, National Center for
Environmental Assessment, U.S. EPA, re: Review of
Proposed Plan for Micro-Exposure Risk Assessment
for Upper Hudson River Project by ChemRisk, June
1, 1995.

p. 803856 - Letter to Mr. Kevin Garrahan, Chief of the

803857 Exposure Assessment Branch, National Center for
Environmental Assessment, U. S. EPA, Ms. Jackie
Moya, National Center for Environmental
Assessment, U.S. EPA, and Barbara Beck, Ph.D.,
Gradient Corporation, from Russell E. Keenan,
Ph.D., National Director, ChemRisk Division, Chief
Health Scientist--Managing Principal, re: Interest
in obtaining the raw data files and the associated
documentation for the state-wide angler survey,
July 11, 1995.

90


-------
P.	803858 - Report: Rensselaer County Environmental Management

803860 Council's Comments on Catch and Release Fishing on
the Upper Hudson, prepared by Mr. Ken Duffy,
Executive Director, Rensselaer County
Environmental Management Council, July 17, 1995.

P.	803861 - Report: Consumption of Freshwater Fish by Maine

803935 Anglers and Related Issues, prepared by Ms.

Natalie W. Harrington, ChemRisk Division,
McLaren/Hart Environmental Engineering Corp., Mr.
Russell E. Keenan, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., prepared for U.S.
EPA, Region II, September 21, 1995.

P. 803936 - Letter to Section 8(e) Coordinator, Document
803938 Processing Center (7407), Office of Toxic

Substances, U.S. EPA, from Mr. Stephen B. Hamilton
Manager, Environmental Science and Technology,
Corporate Environmental Programs, General Electric
Company, re: Preliminary results from a chronic (2
year) feeding study in Sprague-Dawley rats,

October 10, 1995.

P. 803939 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
803960 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Utilization of PCB Toxicity Information,
January 25, 1996. (Attachment: Partial Settlement
Agreement (w/ attachment), In the United States
District Court for the District of Columbia,
Consolidated Case No. 93-0694 RMU, Amerian Forest
and Paper Association, Inc., Plaintiff, v. U.S.
EPA, Defendant, General Electric Company,
Plaintiff, v. U.S. EPA, Defendant, and Ms. Carol
M. Browner, Administrator, Defendants, November 7,
1995.)

P. 803961 - Letter (w/ attachments) to Mr. Kevin Garrahan,

803977 Chief, Exposure Assessment, U.S. EPA, from Russell
E. Keenan, Ph.D., Vice President, Chief Health
Scientist, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., and Ms. Natalie
W. Harrington, Senior Associate Health Scientist,
ChemRisk Division, McLaren/Hart Environmental
Engineering Corp., re: results of additional Maine
angler survey analyses, March 1, 1996.

91


-------
P. 803978 - Letter to Ms. Susan Brager, ERG, from Mr. James A.
803979 Moore, President, Institute for Evaluating Health
Risks, re: Participation in peer review workshop,
May 13, 1996.

P. 803980 - Report: Social and Economic Impacts of Catch-
8 03 982	and-Release Fishing on the Hudson River: a

	Workshop, prepared by Office of the Hudson River

Foundation, June 12, 1996.

P. 803983 - Letter to Ms. Judith Schmidt-Dean, from Mr. John

803984 P. Cahill, Commissioner, New York State Department
of Environmental Conservation, re: Testimony on
the economic aspects of the Hudson River, December
29, 1997.

P. 803985 - Press Release: Largest Human Study Finds No Link

	803988 Between PCB Exposure and Cancer Mortality,

prepared by Institute for Evaluating Health Risks,
March 10, 1999.

P. 803989 - Letter (w/ attachment) to Interested Party, from

803991 Mr. Mark Van Deusen, Outreach Unit, New York State
Department of Health, re: 1999 Draft Health
Consultation report for Hudson River PCBs Site,
March 1999.

P. 803992 - Press Release: Hudson River PCB Research Project

	803992 Announced, prepared by DOH News, New York State

Department of Health,

http.//www.health.state.ny.us/nysdoh/commish/9 9/pc
b.htm, April 23, 1999; printed January 17, 2001.

P. 803993 - Email to Research Brief List, from

803995 Inhof.Christina, National Institute of

Environmental Health Sciences, National Institute
of Health, re: NIEHS/EPA Superfund Basic Research
Program "Research Brief" - Number 49, June 30,
1999.

P. 803996 - Report: Letters to the Editor, prepared by Journal

	804002 of Occupational and Environmental Medicine,

September 1999.

P. 804003 - Letter to Mr. James F. Warchall, Sidley & Austin,
804018 from William H. Farland, Ph.D., Director, Office
of Research and Development, National Center for
Environmental Assessment, U.S. EPA, re: Freedom of

92


-------
Information Act Request: HQ-RIN-01093-00, April 7,
2000. (Attachments: (1) Indices of material
responsive to Sidley & Austin FOIA request (HQ-
RIN-01093-00; (2) Memorandum to Dr. James
Cogliano, National Center for Environmental
Assessment, U.S. EPA, from M. Harnois,
Massachusetts Department of Environmental
Protection, re: Research Report on PCBs by R.
Kimbrough (JOEM 41:161, 1999), March 23, 1999; (3)
Letter to Dr. James Cogliano, National Center for
Environmental Assessment, U.S. EPA, from David
Ozonoff, M.D., M.P.H., Professor and Chair,
Department of Environmental Health, Boston
University School of Public Health, re: Kimbrough
et al. study, June 6, 1999; (4) Memorandum to Mr.
James Colleano, from Ms. Mary S. Wolff, Division
of Environmental and Occupational Medicine, Mount
Sinai School of Medicine, re: review of the JOM
Kimbrough article, September 1, 1999; (5) Letter
to Dr. James Cogliano, Chief, Quantitative Risk
Methods Group, National Center for Environmental
Assessment, U.S. EPA, from Thomas Mack, M.D.,
Professor, Department of Preventive Medicine,
USC/Norris Comprehensive Cancer Center, University
of Southern California School of Medicine, re:
Review of the Kimbrough paper on PCBs, undated,
facsimile date May 1, 2000.)

P. 804019 - Report: GE Rat-Feeding Study and EPA PCB Cancer
804020 Reassessment, undated.

P. 804021 - Report: GE Study of 7,075 Capacitor Workers,

804037 prepared by Renate D. Kimbrough, M.D., Principal
Investigator, Martha Doemland, Ph.D., and Maurice
LeVois, Ph.D., undated.

P. 804038 - Letter to Mr. Douglas Tomchuk, Remedial Project

804040 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, Hudson River, General
Electric Company, re: Reassessment of PCB Toxicity
- Reassessment of the Pathological Diagnoses of
the Key Rat Feeding Studies, August 26, 1991.

P. 804041 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
804047 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Technical Project Manager, Hudson River, General

93


-------
Electric Company, re: New Information on PCB
Toxicity, October 4, 1991. (Attachment: Article:
Effects of Perinatal Polychlorinated Biphenyls and
Dichlorodiphenyl Dichloroethene on Later
Development, prepared by Beth C. Galden, Ph.D.,
and Walter J. Rogan, M.D., July 1991.)

P. 804048 - Letter to Dr. Erich W. Bretthauer, Assistant

804064 Administrator for Research and Development, U.S.

EPA, from Mr. Stephen B. Hamilton, Jr., Manager-
Environmental Science and Ecology, General
Electric Company, re: GE's Comments on EPA's
Scientific Reassessment of Dioxin Risks, December
13, 1991. (Attachments: (1) Comments from General
Electric Company, (2) TEF Development for Wildlife
Effects.)

P. 804065 - Letter (w/attachments) to Ms. Jeanne M. Fox,

804073 Regional Administrator, U.S. EPA, Region II, from
Mr. Stephen D. Ramsey, Vice President-Corporate
Environmental Programs, General Electric Company,
re: The exposure to DDT and PCBs and risk of
breast cancer, October 31, 1997.

P. 804074 - Letter to The Honorable Carol M. Browner,

804078 Administrator, U.S. EPA, from Mr. Stephen D.

Ramsey, Vice President, Corporate Environmental
Programs, General Electric Company, re: Health
Effects from PCBs, May 19, 1998.

P. 804079 - Letter to Mr. Stephen D. Ramsey, Vice President,

804082 Corporate Environmental Programs, General Electric
Company, from Mr. Timothy Fields, Jr., Acting
Assistant Administrator, U.S. EPA, re: Health
Effects from PCBs, June 19, 1998.

P. 804083 - Letter to Mr. Stephen D. Ramsey, Vice President,

804084 Corporate Environmental Programs, General Electric
Company, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Hudson River PCBs Superfund
Site, August 10, 2000.

94


-------
9.0 NATURAL RESOURCE TRUSTEES
9.2 Findings of Fact

P. 900054 - Report: Preassessment Screen Determination for The

	900096 Hudson River, New York, prepared by The State of

New York, the National Oceanic and Atmospheric
Administration, and the United States Department
of the Interior, October 1, 1997.

9.3 Reports

P. 900001 - Report: Injuries to Hudson River Fishery

900035 Resources: Fishery Closures and Consumption
Restrictions. Hudson River Resource Damage
Assessment, Final Report, prepared by U.S.
Department of the Interior; National Oceanic and
Atmospheric Administration; and New York State
Department of Environmental Conservation, June
2001.

9.4 Correspondence

P. 900036 - Letter to Mr. Douglas W. Beach, Endangered Species
900036 Coordinator, National Marine Fisheries Service,
Environmental Assessment Branch, from Mr. Robert
W. Hargrove, Chief, Environmental Impacts Branch,
U.S. EPA, Region II, re: EPA's initiation for an
informal consultation with the National Marine
Fisheries Services, October 16, 1991. (No
enclosure.)

P. 900037 - Letter to Mr. Leonard Corin, Field Supervisor,

900038 U.S. Fish and Wildlife Service, from Mr. Robert W.
Hargrove, Chief, Environmental Impacts Branch,
U.S. EPA, Region II, re: EPA's initiation for an
informal consultation with the U.S. Fish and
Wildlife Service, October 16, 1991. (No
enclosure.)

P. 900039 - Letter to Mr. Robert W. Hargrove, Chief,

900040 Environmental Impacts Branch, U.S. EPA, Region II,
from Mr. Douglas W. Beach, Fishery Biologist,
United States Department of Commerce, re: Response

95


-------
to the request for a list of endangered species,
October 21, 1991. (No enclosure.)

P. 900041 - Letter to Mr. Robert W. Hargrove, Chief,

900042	Environmental Impacts Branch, U.S. EPA, Region II,
from Mr. Leonard P. Corin, Field Supervisor,

United States Department of the Interior, re:
Response to EPA on the presence of Federally
listed or proposed endangered or threatened
species, November 13, 1991.

P. 900043 - Letter to Mr. Mike Stoll, U.S. Fish and Wildlife

900043	Service, from Ms. Helen Chernoff, Senior
Scientist, TAMS Consultants, Inc., re: Baseline
Ecological Risk Assessment, March 23, 1999.

P. 900044 - Letter to Ms. Helen Chernoff, Senior Scientist,

900049	TAMS Consultants, Inc., from Mr. Mark W. Clough,
Acting for Mr. David A. Stilwell, Acting Field
Supervisor, United States Department of the
Interior, Field and Wildlife Service, re: Response
to information request regarding the presence of
Federally listed or proposed endangered or
threatened species, April 14, 1999.

P. 900050 - Memorandum to Ms. Alison Hess, Remedial Project

900050	Manager, Sediment Projects Team, U.S. EPA, Region
II, from Mr. Robert Witte, Life Scientist,
Environmental Review Section, U.S. EPA, Region II,
re: Endangered Species Act Consultation, Hudson
River PCBs Site, July 15, 1999.

P. 900051 - Letter to Mr. Christopher Mantzaris, Assistant

900051	Regional Administrator for Protected Resources,
National Marine Fisheries Service, from Ms. Grace
Musumeci, Chief, Environmental Review Section,
Strategic Planning and Multi-Media Programs
Branch, U.S. EPA, Region II, re: Hudson River
Superfund Site, February 16, 2001.

P. 900052 - Letter to Ms. Grace Musumeci, Chief, Environmental

900053 Review Section, Strategic Planning and Multi-Media
Programs Branch, U.S. EPA, Region II, from Ms.

Mary Colligan, Acting Assistant Regional
Administrator for Protected Resources, United
States Department of Commerce, re: Response to
request for information on the presence of
threatened or endangered species in the vicinity

96


-------
of the Hudson River PCBs Superfund Site, May 7,
2001.

10.0 PUBLIC PARTICIPATION

10.1 Comments and Responses

001-0318-0319 Letter to Bridget Barclay, Hudson River Sloop
Clearwater, Inc., and Cara Lee, Scenic Hudson,
from C. Sidamon-Eristoff, Regional Administration,
U.S. EPA, re: December 12, 1990 letter which
expressed concern over the manner in which the
public was informed about the meeting on the Scope
of Work for the Reassessment RI/FS and the lack of
information repositories, January 18, 1991.

001-0320-0321 Letter to C. Sidamon-Eristoff, Regional

Administration, U.S. EPA, from Bridget Barclay,
Hudson River Sloop Clearwater, Inc., and Cara Lee,
Scenic Hudson, re: concern over the late receipt
of the public meeting press release and the
location of the public meeting, December 12, 1990.

001-0322-0322 Letter to Douglas J. Tomchuk, U.S. EPA, from
Robert J. Kafin, Proskauer Rose, on behalf of
General Electric Co., forwarding the enclosed
comments on the draft Scope of Work prepared by
TAMs Consultants, January 21, 1991.

001-0323-0349 Comments of the General Electric Company on the
TAMs Scope of Work for the Hudson River PCBs
Reassessment Remedial Investigation/

Feasibility Study, January 21, 1991.

001-0354-0358 Letter to C. Sidamon-Eristoff, Regional

Administrator, U.S. EPA, from Bridget Barclay,
Hudson River Sloop Clearwater, Inc., re: comments
on the Phase I - Work Plan of the Preliminary
Reassessment Hudson River PCB Remedial
Investigation/Feasibility Study, February 12,

1991.

001-0359-0360 Letter to Gerald B. Solomon, U.S. Congress, from
C. Sidamon-Eristoff, Regional Administrator, U.S.
EPA, re: Mr. Solomon's March 4, 1991, letter

97


-------
requesting that EPA collect new data on the Hudson
River environment as part of the Reassessment
Remedial Investigation/Feasibility Study, March
21, 1991.

001-0361-0362 Letter to C. Sidamon-Eristoff, Regional

Administrator, U.S. EPA, from Gerald B. Solomon,
U.S. Congress, re: request that EPA collect new
data on the Hudson River environment as part of
the Reassessment Remedial Investigation/
Feasibility Study, March 4, 1991.

001-0363-0366 Letter to Interested Parties from Douglas J.

Tomchuk, U.S. EPA, re: Hudson River PCBs Oversight
Committee will have its first meeting on April 4,
1991, March 28, 1991.

001-0367-0368 Letter Douglas J. Tomchuk, U.S. EPA, from John H.

Claussen, General Electric Company, re: forwarding
the enclosed General Electric's comments on the
Reassessment Phase I Work Plan), March 29, 1991.

001-0369-0396 Comments of the GE Company on the TAMs Phase I -
Work Plan: Hudson River PCB Reassessment RI/FS,
March 28, 1991.

001-0397-0400 Letter to Alan Swift, U.S. Congress, from Bridget
Barclay, Hudson River Sloop Clearwater, Inc., and
Cara Lee, Scenic Hudson, re: concern over EPA's
re-evaluation of its 1984 interim "no-action"
decision on PCBs in the Hudson River, April 24,
1991.

001-0401-0402 Letter to William K. Reilly, Administrator, U.S.

EPA, from Gerald B. Solomon, U.S. Congress, re:
request that the release of a PCB Risk Assessment
be delayed until it can be based on new and
accurate scientific information, May 9, 1991.

001-0403-0407 Letter to Douglas J. Tomchuk, U.S. EPA, from John
G. Haggard, General Electric Company, re: concern
over issues raised at the April 25, 1991, meeting
regarding EPA's Hudson River PCBs site
Reassessment Remedial Investigation, May 9, 1991.

001-0408-0412 Letter to Douglas J. Tomchuk, U.S. EPA, from John
G. Haggard, General Electric Company, re: concern
with the findings presented and the procedures

98


-------
followed for the Hudson River PCBs site Phase I
Reassessment Remedial Investigation, June 14,
1991.

002-0415-0417 Letter to Gerald B. Solomon, U.S. Congress, from
C. Sidamon-Eristoff, Regional Administrator, U.S.
EPA, re: Mr. Solomon's letter of May 9, 1991
requesting that the release of a PCB Risk
Assessment be delayed until it can be based on new
and accurate scientific information, June 21,

1991.

001-0422-0422 Letter to Liaison Group Members from Ann

Rychlenski, U.S. EPA, re: the Phase I Report on
the Hudson River PCBs Reassessment will not be
ready for the July 16, 1991 meeting, July 8, 1991.

001-0423-0425 Letter to C. Sidamon-Eristoff, Regional

Administrator, U.S. EPA, from Gerald B. Solomon,
U.S. Congress, re: comments on the Hudson River
PCBs site Reassessment, July 15, 1991.

001-0426-0427 Letter to John F. Welch, General Electric Company,
from C. Sidamon-Eristoff, Regional Administrator,
U.S. EPA, re: the advisability of releasing a
preliminary Quantitative baseline Risk Assessment,
July 15, 1991.

001-0428-0429 Letter to Mr. Darryl L Decker, Government Liaison
Group, from C. Sidamon-Eristoff, Regional
Administrator, U.S. EPA, re: the release of a
preliminary Risk Assessment as part of the Phase I
Report of the Reassessment Remedial
Investigation/Feasibility Study for the Hudson
River PCBs site, July 17, 1991.

001-0430-0431 Letter to C. Sidamon-Eristoff, Regional

Administrator, U.S. EPA, from various authors, re:
concern over EPA's re-evaluation of its 1984
interim "no-action" decision on PCBs in the Hudson
River, July 19, 1991.

001-1195-1197 Letter to Gerald B Solomon, U.S. Congress, from C.

Sidamon-Eristoff, Regional Administrator, U.S.
EPA, re: response to Mr. Solomon's July 15, 1991
letter concerning EPA's decision to include a
preliminary quantitative Risk Assessment in the

99


-------
Phase I Report of the Reassessment for the Hudson
River PCBs site, August 23, 1991.

001-1394-1399 Statement by the General Electric Company on the
Phase I Report of the Hudson River PCBs
Reassessment Project, September 11, 1991.

001-1400-1405 Letter to Douglas Tomchuk, U.S. EPA, from John G.

Haggard, General Electric Company, re: comments on
the Phase 2A Sampling Plan for the Hudson
River PCBs Reassessment, September 24, 1991.

001-1406-1416 Appendix A - Comments by the General Electric
Company on the USEPA's Phase 2A Sampling and
Analysis Plan Hudson River Reassessment RI/FS,
September 24, 1991.

001-1449-1449 Letter to Douglas Tomchuk, U.S. EPA, from John G.

Haggard, General Electric Company, re: enclosed
comments by General Electric on EPA's Phase I
Report for the Hudson River PCBs Reassessment by
John H. Claussen, October 24, 1991.

001-1450-17	94 Comments of the General Electric Company on the

August 1991 Review Copy of the Phase I Report -
Interim Characterization and Evaluation

	for the Hudson River PCB Reassessment RI/F,

October 24, 1991.

002-0001-0736	Appendices to Comments of the General Electric
Company on the August 1991 Review Copy of the
Phase I Report - Interim Characterization and
Evaluation for the Hudson River PCB Reassessment

	RI/FS, October 24, 1991.

002-0737-0738 Letter to Douglas Tomchuk, U.S. EPA, from John G.

Haggard, General Electric Company, re: reduced
potency of Lower Chlorinated PCB Homologs
regarding the Phase I Hudson River report,

December 3, 1991.

002-2422-2427 Letter to Douglas Tomchuk, U.S. EPA, from Thomas
G. Echikson and Angus Macbeth, Sidley & Austin,
re: enclosed Hudson River PCBs Superfund Site:

PMCR Comments of General Electric Company,

November 21, 1996.

100


-------
002-2428-2487 Comments of General Electric Company on Phase 2
Report - Review Copy, Further Site
Characterization and Analysis, Volume 2B -

	Preliminary Model Calibration Report, Hudson River

PCBs Reassessment RI/FS, prepared by John
Connolly, HydroQual, Inc., John G. Haggard,

General Electric, and Melvin B. Schweiger: General
Electric, November 21, 1996.

002-2488-2489 Letter to Douglas Tomchuk, U.S. EPA, from Angus

Macbeth: Sidley & Austin, re: enclosed comments of
General Electric Company on Data Evaluation and
Interpretation Report, April 11, 1997.

002-2490-0183 Comments of General Electric Company on Phase 2
Report - Review Copy, Further Site
Characterization and Analysis, Volume 2C - Data
Evaluation and Interpretation Report, Hudson River
PCBs Reassessment RI/FS, prepared by John
Connolly: HydroQual, Inc., John G. Haggard,

General Electric, Melvin B. Schweiger, General
Electric, April 11, 1997.

P. 10.1195 Letter (w/attachments) to All Citizen Liaison

10.1205 Group Members, from Ms. Judy Schmidt-Dean, Chair,
Citizen Liaison Group, re: Correspondence from
Alison Hess, Project Manager, concerning the EPA
National Remedy Review Board review, September 18,
2000 .

P. 10.1206 - Letter (w/attachment) to Mr. Constantine Sidamon-
10.1209 Eristoff, Regional Administrator, U.S. EPA, Region
II, from Ms. Bridget Barclay, Environmental
Director, Hudson River Sloop Clearwater and Ms.
Cara Lee, Environmental Director, Scenic Hudson,
re: Meeting on September 14 and environmental
community involvement, September 20, 1990.

P. 10.1210 - Letter to Mr. Constantine Sidamon-Eristoff,

10.1211 Regional Administrator, U.S. EPA, Region II, from,
Ms. Cara Lee, Environmental Director, Scenic
Hudson, Inc., re: Hudson River PCB Reassessment
Activities, December 12, 1990.

P. 10.1212 - Comments: Comments on Phase I Report, Re: River

	10.1216 discharge - Sediment Transport - PCB loading

relations, prepared by G.W. Putman, EPA Hudson
River Technical Committee, September 23, 1991.

101


-------
P. 10.1217 - Letter to Mr. Douglas Tomchuk, Remedial Project
10.1219 Manager and Ms. Ann Rychlenski, Community

Relations Coordinator, U.S. EPA, Region II, from
Ms. Cara Lee, Environmental Director, Scenic
Hudson, Inc., re: Hudson River Reassessment
Process, October 24, 1991.

P. 10.1220 - Report: Executive Briefing, General Electric Co.' i

	10.1240 Comments on EPA's Phase I Report of the Hudson

River PCB Reassessment, December 1991.

P. 10.1241 - Comments: General Electric Co. Preliminary

	10.1243 Comments on EPA's Phase II Work Plan and Sampling

Plan, Hudson River PCBs Reassessment RI/FS,
Columbia-Greene Community College, prepared by
General Electric Company, Corporate Environmental
Programs, June 18, 1992.

P. 10.1244 - Letter to Mr. Douglas Tomchuk, Hudson River PCBs
10.1498 Site Project Manager, U.S. EPA, Region II, from
Mr. John H. Claussen, Manager, Hudson Project
Team, General Electric Corporate Environmental
Programs, re: General Electric's comments on EPA's
Phase 2 Work Plan and Sampling Plan for the Hudson
River Reassessment, July 24, 1992. (Attachment:
Report: Comments of the General Electric Company
on the June 1992 Review Copy of the Phase 2 Work
Plan and Sampling Plan for the Hudson River PCB
Reassessment RI/FS, prepared by General Electric
Company, July 24, 1992.)

P. 10.1499 - Letter to Mr. Constantine Sidamon-Eristoff,

10.1500 Regional Administrator, U.S. EPA, Region II, from
Ms. Bridget Barclay, Environmental Director,

Hudson River Sloop Clearwater, re: Need for a
policy decision by EPA regarding PCB exposure,
September 29, 1992.

P. 10.1501 - Letter to Ms. Sophie Morris, SUNY Campus, from
10.1502 Ms. Ann Rychlenski, Community Relations

Coordinator, External Programs Division, U.S. EPA,
Region II, re: Relocation of EPA Information
Repository for the Hudson River PCBs Reassessment,
October 12, 1994.

P. 10.1503 - Report: Review of the Hudson River PCBs

	10.1534 Reassessment RI/FS Phase 2 Report, Volume 2B -

Preliminary Model Calibration Report, Presented to

102


-------
the U.S. Environmental Protection Agency, Region
II, prepared by HydroQual, Inc., prepared for
General Electric Company, February 5, 1997.

P. 10.1535 - Briefs: GE Science Briefs, prepared by General
10.1544 Electric Company, March 19, 1997.

P. 10.1545 - Report: Preliminary Review of EPA's Data

	10.1559 Evaluation Report, prepared by General Electric

Company, March 21, 1997.

P. 10.1560 - Letter to Mr. Douglas Tomchuk, Remedial Project
10.1758 Manager, U.S. EPA, Region II, from Mr. Angus
Macbeth, Sidley & Austin, General Electric
Company, re: DEIR Comments, April 11, 1997.
(Attachment: Report: Comments of General Electric
Company on Phase 2 Report - Review Copy, Further
Site Characterization and Analysis, Volume 2C -
Data Evaluation and Interpretation Report, Hudson
River PCBs Reassessment RI/FS, February 1997,
prepared by Mr. Melvin B. Schweiger and Mr. John
G. Haggard, Corporate Environmental Programs,
General Electric Company, and Mr. John Connolly,
HyrdroQual, Inc., April 11, 1997.)

P. 10.1759 - Letter to Mr. William McCabe, Deputy Director,
10.1763 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. Peter Balet, Chairman,
Saratoga County Environmental Management Council,
re: Concern over problems associated with the
timely dissemination of information regarding the
Hudson River PCB Superfund Reassessment to the
public, January 13, 1998.

P. 10.17 64 - Letter (w/attachment) to Mr. Douglas Tomchuk,
10.1771 Remedial Project Manager, U.S. EPA, Region II,
from Mr. John G. Haggard, Engineering Project
Manager, Hudson River Project, General Electric
Company, re: Comments on the Landfill/Treatment
Facility Siting Survey, February 17, 1998.

P. 10.1772 - Letter to Mr. William J. Muszynski, Deputy

10.1773 Regional Administrator, U.S. EPA, Region II, from
Ms. Cara Lee, Environmental Director, Scenic
Hudson, Mr. Andy Mele, Environmental Director,
Hudson River Sloop Clearwater, Mr. John Cronin,
Riverkeeper and Ms. Nancy Marks, Senior Attorney,
Natural Resources Defense Council, re: Concerns of

103


-------
the group that additional peer review will delay
the reassessment process, February 20, 1998.

P. 10.1774 - Letter to Mr. William McCabe, Deputy Director,
10.1776 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. Peter Balet, Chairman,
Saratoga County Environmental Management Council,
re: Saratoga County Environmental Management
Council's belief that a comprehensive scientific
peer review process would be useful in determining
the validity of the scientific assumptions,
methodologies and data utilized in the Hudson
River PCB Reassessment, July 27, 1998.

P. 10.1777 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,
10.1780 from Mr. David Adams, Member-at-Large, Saratoga
County Environmental Management Council and
Member, Government Liaison Committee, re:
Questions/comments for use by Peer Review
Committee in its review of EPA Preliminary Model
Calibration Report, Phase 2 Report, Volume 2B,
dated October 1996, July 27, 1998.

P. 10.1781 - Letter to Mr. John Haggard, Engineering Project
10.1795 Manager, General Electric Company, from Mr. Paul
Switzer, re: Hudson River, August 24, 1998.
(Attachment: Comments on 1998 U.S. EPA Low
Resolution Sediment Coring Report, prepared by
Paul Switzer, August, 1998.)

P. 10.1796 - Letter to Mr. Douglas Tomchuck, Project Manager,
10.2213 U.S. EPA, Region II, from Mr. Thomas G. Echikson,
Sidley & Austin, re: HHRA SOW Comments, August 31,
1998. (Attachment: Report: Comments of General
Electric Company on Hudson River Reassessment
RI/FS, Phase 2 Human Health Risk Assessment, Scope
of Work, July 1998, prepared by Mr. Melvin B.
Schweiger and Mr. John G. Haggard, General
Electric Company, Corporate Environmental Programs
and Russell Keenan, Ph.D. and Mr. Paul Price,
Ogden Environment and Energy Services, August 31,
1998.)

P. 10.2214 - Report: Review of EPA Low Resolution Core Study,
10.2259 prepared by Quantitative Environmental Analysis,
LLC, September 15, 1998.

104


-------
P. 10.2260 - Letter to Mr. Damien Hughes, U.S. EPA, Region II,

10.2267	from Mr. Peter M. Balet, Chairman, Saratoga County
Environmental Management Council, re: Submission
of enclosed comments/questions relative to the
Phase 2 Data Evaluation and Interpretation Report
and Phase 2 Low Resolution Sediment Coring Report,
December 18, 1998. (Attachments: (1) Comments:
Selected Comments/Questions on EPA Phase 2 Report,
Volume 2C - Data Evaluation and Interpretation
Report (DEIR), Hudson River PCBs Reassessment
RI/FS February, 1997 for Peer Review Committee,
prepared by Mr. David D. Adams, Member, Saratoga
County Environmental Management Council and
Government Liaison Group; (2) Comments: Selected
Comments/Questions on Volume 2C - A Low Resolution
Sediment Coring Report, July 1998 for Peer Review
Committee, prepared by Mr. David D. Adams, Member-
at-Large, prepared for the Saratoga County
Environmental Management Council.)

P. 10.2268 - Letter to Dr. Thomas Mack, USC/Norris

10.2268	Comprehensive Cancer Center, from Jim Cogliano,
Ph.D., Chief, Quantitative Risk Methods Group,
National Center for Environmental Assessment, re:
Request for review of PCB cancer mortality study,
April 29, 1999.

P. 10.2269 - Letter to Ms. Merrilyn Pulver, Fort Edward Town

10.2270 Councilwoman, Co-Chair Agricultural Liaison Group,
from Mr. Melvin Hauptman for Mr. William McCabe,
Deputy Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Councilwoman's
August 17, 1999 letter, in which a public meeting
with EPA's and General Electric's teams was
requested, October 21, 1999.

P. 10.2271 - Letter to Mr. Douglas Tomchuck, Remedial Project

10.2272	Manager, U.S. EPA, Region II, from Ms. Sharon
Ruggi, Councilwoman & Deputy Supervisor and Ms.
Merrilyn Pulver, Supervisor, re: Questions for
Baseline Modeling Report Peer Review (3), December
15, 1999.

P. 10.2273 - Letter to Mr. Douglas Tomchuck, Remedial Project

10.2273	Manager, U.S. EPA, Region II, from Ms. Judy
Schmidt-Dean, Chair, Citizen Liaison Group, re:
Peer Review (3) of the Baseline Modeling Report,
December 17, 1999.

105


-------
P. 10.2274 - Letter to Mr. Douglas Tomchuck, Remedial Project
10.2274 Manager, U.S. EPA, Region II, from Mr. Rich

Schiafo, Environmental Associate, Scenic Hudson,
Inc. re: Charge Questions for Peer Review (3) of
Baseline Modeling Report, December 20, 1999.

P. 10.2275 - Letter to Mr. Douglas Tomchuck, Remedial Project
10.2277 Manager, U.S. EPA, Region II, from George W.

Putman, Ph.D., re: Submissions to Peer Review (3),
December 23, 1999.

P. 10.2278 - Letter (w/attachment) to Dr. Per Larsson,

10.2282 Assistant Professor, Lund University,

Ecotoxicology, Department of Ecology, from Mr.
David D. Adams, P.E., Member-At-Large, Saratoga
County Environmental Management Council, Member,
Government Liaison Committee, C., re: Charge for
Peer Review 3, Specific Question 11, March 13,
2000 .

P. 10.2283 - Controlled Correspondence to Administrator, U.S.

10.2289 EPA, from Mr. Robert J. Kafin, Proskauer Rose LLP,
re: C2 - Meeting - Discuss Hudson River PCBs
Superfund Site, March 21, 2001. (Attachments: (1)
Letter to Honorable Christine Todd Whitman,
Administrator, U.S. EPA, from Mr. Robert J. Kafin,
Proskauer Rose LLP, re: Hudson River PCBs
Superfund Site, March 21, 2001; (2) Letter to
Honorable Christine Todd Whitman, Administrator,
U.S. EPA, from Mr. Robert J. Kafin, Proskauer Rose
LLP, re: Hudson River PCBs Superfund Site,

February 15, 2001; (3) Letter to Robert J. Kafin,
Esq., Proskauer Rose LLP, from Ms. Kathleen C.
Callahan, for Mr. William J. Muszynski, P.E.,
Acting Regional Administrator, U.S. EPA, Region
II, re: Hudson River PCBs Superfund Site, March
15, 2001.

P. 10.2290 - Comments: Comments on USEPA Responsiveness Summary

	10.2297 for Volume 2C - A Low Resolution Sediment Coring

Report, prepared by Mr. Paul Switzer, undated.

P. 10.2298 - Comments: Additional comments prepared by Ms.
10.2301 Ellen Bentzen, Ph.D., Research Scientist,

Department of Environmental and Resource Studies,
Trent University, re: HUDTOX model - Peer Review
(3), undated.

106


-------
P. 10.2302 - Report: Comments of the General Electric Company

	10.2339 On: Preliminary Model Calibration Report, Revised

	Appendix B, Mathematical Modeling of PCB Fate and

	Transport for Hudson River PCB Reassessment RI/FS:

	Current Modeling Work Plan, undated.

P. 10.2781 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region
10.2789 II, from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: General Electric
Comments on EPA Responsiveness Summary, Phase 2 -
Ecological Risk Assessment Scope of Work, Hudson
River PCBs Reassessment RI/FS, June 29, 1999.

P. 10.2790 - Letter to Mr. Douglas J. Tomchuk, U.S. EPA, Region
10.2805 II, from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Upper Hudson River -
Comments on EPA Responses to Comments on the Human
Health Risk Assessment Scope of Work, July 13,
1999.

P. 10.2806 - Letter to Ms. Alison A. Hess, C.P.G., U.S. EPA,
10.2873 Region II, from Mr. John G. Haggard, Engineering
Project Manager, GE Corporate Environmental
Programs, General Electric Company, re: Hudson
River Ecological Risk Assessment - Comments,
September 7, 1999. (Attachment: Report: Comments
of General Electric Company on Volume 2E -
Baseline Ecological Risk Assessment Hudson River
PCBs Reassessment RI/FS, prepared by General
Electric Company, Corporate Environmental
Programs, LWB Environmental Services, Inc., and
Quantitative Environmental Analysis, Inc.,
September 7, 1999.)

P. 10.2874 - Letter to Dr. George Putnam, Department of Earth
10.2880 and Atmospheric Sciences, State University of New
York at Albany, from Ms. Alison A. Hess, C.P.G.,
Project Manager, U.S. EPA, Region II, re: U.S.
EPA, Region II response to Dr. Putnam's 7/1/99
letter commenting on the U.S. EPA's April 1999
Responsiveness Summaries for the Phase 2
Ecological Risk Assessment Scope of Work and the
Phase 2 Human Health Risk Assessment Scope of
Work, October 21, 1999.

107


-------
P. 10.2920 - Letter to Mr. Douglas J. Tomchuk, Remedial

10.2922 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCB Site, April 30, 1992.

P. 10.2923 - Letter to Mr. Douglas J. Tomchuk, Remedial

10.3008 Project Manager, Emergency and Remedial Response
Division, U.S. EPA, Region II, from Mr. John G.
Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Comments on the Great Lakes Initiative, April
30, 1992. (Attachment: Report: Comments of
General Electric Company to the Drinking Water
Committee of the Science Advisory Board on the
Proposed Great Lakes Quality Initiative Human
Health - Based Water Quality Criteria, prepared by
Corporate Environmental Programs, General Electric
Company, April 10, 1992.)

P 10.3009 - Letter to Mr. Douglas J. Tomchuk, Remedial

10.3036 Project Manager, Emergency and Remedial Response
Division, U.S. EPA, Region II, from Mr. John G.
Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Reevaluation of PCB Toxicity, October 28,
1994. (Attachment: Report: A Comparison of Liver
Tumor Diagnoses from Seven PCB Studies in Rats,
prepared by Mr. John A. Moore, Institute for
Evaluating Health Risks, Mr. Jerry F. Hardisty,
Experimental Pathology Laboratories, Inc., Ms.
Debora A. Banas, Experimental Pathology
Laboratories, Inc., Ms. Mary A. Smith, University
of Georgia, 1994.)

P. 10.3037 - Memorandum to Hudson River PCBs Environmental
10.3040 Liaison Group, from Ms. Cara Lee and Mr. Josh

Cleland, Scenic Hudson Inc., and Mr. Andy Mele,
Hudson River Sloop Clearwater, re: Risk Assessment
Issues, March 7, 1997.

P. 10.3041 - Letter to Mr. Damien Hughes, Remedial Project

10.3045 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. Melvin B. Schweiger,
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Preliminary Model

108


-------
Calibration Report: Peer Review Questions, July
20, 1998.

P. 10.3046 - Letter to Mr. Richard L. Caspe, Director,

10.3048 Emergency and Remedial Response Division, U.S.
EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Request for Extension - Hudson River Risk
Assessments, August 31, 1999.

P. 10.3049 - Letter to Dr. Grace Luk, Professor, Civil

10.3053 Engineering, Ryerson Polytechnic University, from
Mr. David D. Adams, P.E., Member-At-Large,

Saratoga County Environmental Management Council,
re: Charge for Peer Review 3 Specific Question 11,
March 13, 2000 (Attachment: Selected Comments.)

P. 10.3054 - Letter to Dr. Ellen Bentzen, Research Scientist,

10.3065	Environmental Modeling Center, Environmental
Studies, Trent University, from Mr. John G.
Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Baseline
Modeling Report Peer Review, March 20, 2000
(Attachment: Report: Critical Issues Imbedded in
Fate and transport Model Peer Review Charge
Question 11, prepared by Dr. John Connolly,
Quantitative Environmental Analysis, LLC.,
prepared for GE Corporate Environmental Programs,
General Electric Company, March 20, 2000.)

P. 10.3066 - Letter to Dr. Steven Eisenrich, Professor,

10.3066	Department of Environmental Science, Rutgers
University, from Mr. John G. Haggard, Engineering
Project Manager, GE Corporate Environmental
Programs, General Electric Company, re: Hudson
River PCBs Superfund Site: Baseline Modeling
Report Peer Review, March 20, 2000.

P. 10.3067 - Letter to Dr. Per Larsson, Assistant Professor,

10.3067	Ecotoxicology, Department of Ecology, Solveg 37,
from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Hudson River PCBs
Superfund Site: Baseline Modeling Report Peer
Review, March 20, 2000.

109


-------
P. 10.3068 - Letter to Dr. Grace Luk, Professor, Civil

10.3068	Engineering, Ryerson Polytechnic University, from
Mr. John G. Haggard, Engineering Project Manager,
GE Corporate Environmental Programs, General
Electric Company, re: Hudson River PCBs Superfund
Site: Baseline Modeling Report Peer Review, March
20, 2000.

P. 10.3069 - Letter to Dr. Wu-Seng Lung, Professor, Department

10.3069	of Civil Engineering, University of Virginia, from
Mr. John G. Haggard, Engineering Project Manager,
GE Corporate Environmental Programs, General
Electric Company, re: Hudson River PCBs Superfund
Site: Baseline Modeling Report Peer Review, March
20, 2000.

P. 10.3070 - Letter to Dr. Robert Nairn, Principal, W. F. Baird

10.3070	and Associates, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Baseline
Modeling Report Peer Review, March 20, 2000.

P. 10.3071 - Letter to Dr. Ross Norstrom, Principal, RJN

10.3071	Environmental, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Baseline
Modeling Report Peer Review, March 20, 2000.

P. 10.3072 - Letter to Owen Hoffman, Ph.D., President and

10.3085 Director, SENES Oak Ridge, Inc., from Mr. John G.

Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Human Health
Risk Assessment Peer Review, April 28, 2000.
(Attachment: Report: Hudson River Monte Carlo
Analysis, prepared by Dr. Russ Keenan, Ogden
Environmental and Energy Services, prepared for GE
Corporate Environmental Programs, General Electric
Company, April 28, 2000.)

Letter to Ms. Holly Hattemer-Frey, Senior Risk
Assessment Consultant, SAF*RISK, from Mr. John G.
Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,

P. 10.3086 -
10.3087

110


-------
re: Hudson River PCBs Superfund Site: Human Health
Risk Assessment Peer Review, April 28, 2000.

P. 10.3088 - Letter to Pamela Shubat, Ph.D., Environmental

10.3089 Toxicologist, Minnesota Department of Health, from
Mr. John G. Haggard, Engineering Project Manager,
GE Corporate Environmental Programs, General
Electric Company, re: Hudson River PCBs Superfund
Site: Human Health Risk Assessment Peer Review,
April 2 8, 2000.

P. 10.3090 - Letter to Lee Shull, Ph.D., Principal/Director

10.3091 Health & Risk Services Program, NewFields, Inc.,
from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Hudson River PCBs
Superfund Site: Human Health Risk Assessment Peer
Review, April 28, 2000.

P. 10.3092 - Letter to Harlee Strauss, Ph.D., H. Strauss
10.3093 Associates, Inc., from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Human Health
Risk Assessment Peer Review, April 28, 2000.

P. 10.3094 - Letter to Robert Willes, Ph.D., Director and

10.3095 Senior Vice President, Cantox Environmental Inc.,
from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Hudson River PCBs
Superfund Site: Human Health Risk Assessment Peer
Review, April 28, 2000.

P. 10.3096 - Letter to Sean Kennedy, Ph.D., Ecotoxicology

10.3115 Consultant, from Mr. John G. Haggard, Engineering
Project Manager, GE Corporate Environmental
Programs, General Electric Company, re: Hudson
River Ecological Risk Assessment, April 28, 2000.
(Attachments: (1) Report: Assessment and
Measurement Endpoints/Risk Characterization/
Uncertainty Analysis, April 28, 2000; (2) Report:
Appropriateness of TRVs, April 28, 2000.)

P. 10.3116 - Letter to Dwayne Moore, Ph.D., Senior Associate,
10.3118 Cadmus Group, from Mr. John G. Haggard,

Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,

111


-------
re: Hudson River Ecological Risk Assessment, April
28, 2000.

P. 10.3119 - Letter to Ross Norstrom, Ph.D., President, RJN
10.3121 Environmental, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, April
28, 2000.

P. 10.3122 - Letter to Mr. Tim Thompson, Senior Environmental
10.3124 Scientist, ThermoRetec, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, April
28, 2000.

P. 10.3125 - Letter to Lawrence Kapustka, Ph.D., President,
10.3127 Senior Ecotoxicologist, Ecological Planing and
Toxicology Inc., from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, April
28, 2000.

P. 10.3128 - Letter to Peter deFur, Ph.D., President,

10.3130 Environmental Stewardship Concepts, from Mr. John
G. Haggard, Engineering Project Manager, GE
Corporate Environmental Programs, General Electric
Company, re: Hudson River Ecological Risk
Assessment, April 28, 2000.

P. 10.3131 - Letter to John Toll, Ph.D., Senior Project
10.3133 Manager, Parametrix, Inc., from Mr. John G.

Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, April
28, 2000.

P. 10.3134 - Letter to Lee Shull, Ph.D., Principal/Director

10.3135 Health & Risk Services Program, NewFields, Inc.,
from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Hudson River PCBs
Superfund Site: Human Health Risk Assessment Peer
Review, May 9, 2000.

112


-------
P. 10.3136 - Letter to Pamela Shubat, Ph.D., Environmental

10.3137 Toxicologist, Minnesota Department of Health, from
Mr. John G. Haggard, Engineering Project Manager,
GE Corporate Environmental Programs, General
Electric Company, re: Hudson River PCBs Superfund
Site: Human Health Risk Assessment Peer Review,
May 9, 2000.

P. 10.3138 - Letter to Owen Hoffman, Ph.D., President and

10.3139 Director, SENES Oak Ridge, Inc., from Mr. John G.

Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Human Health
Risk Assessment Peer Review, May 9, 2000.

P. 10.3140 - Letter to Ms. Holly Hattemer-Frey, Senior Risk

10.3141 Assessment Consultant, SAF*RISK, from Mr. John G.

Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Human Health
Risk Assessment Peer Review, May 9, 2000.

P. 10.3142 - Letter to Robert Willes, Ph.D., Director and

10.3143 Senior Vice President, Cantox Environmental Inc.,
from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Hudson River PCBs
Superfund Site: Human Health Risk Assessment Peer
Review, May 9, 2000.

P. 10.3144 - Letter to Harlee Strauss, Ph.D., H. Strauss and
10.3145 Associates, Inc., from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCBs Superfund Site: Human Health
Risk Assessment Peer Review, May 9, 2000.

P. 10.3146 - Letter to Dwayne Moore, Ph.D., Senior Associate,
10.3189 Cadmus Group, from Mr. John G. Haggard,

Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, May
23, 2000. (Attachment: Report: The Hudson River
DEIS: An Interpretive Summary, prepared by Dr.
Lawrence W. Barnthouse, LWB Environmental
Services, prepared for General Electric
Corporation, undated.)

113


-------
P. 10.3190 - Letter to Sean Kennedy, Ph.D., Ecotoxicology

10.3191 Consultant, from Mr. John G. Haggard, Engineering
Project Manager, GE Corporate Environmental
Programs, General Electric Company, re: Hudson
River Ecological Risk Assessment, May 23, 2000.

P. 10.3192 - Letter to Lawrence Kapustka, Ph.D., President,
10.3193 Senior Ecotoxicologist, Ecological Planing and
Toxicology Inc., from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, May
23, 2000.

P. 10.3194 - Letter to Peter deFur, Ph.D., President,

10.3195 Environmental Stewardship Concepts, from Mr. John
G. Haggard, Engineering Project Manager, GE
Corporate Environmental Programs, General Electric
Company, re: Hudson River Ecological Risk
Assessment, May 23, 2000.

P. 10.3196 - Letter to Dr. Ross Norstrom, President, RJN
10.3197 Environmental, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, May
23, 2000.

P. 10.3198 - Letter to Mr. Tim Thompson, Senior Environmental
10.3199 Scientist, ThermoRetec, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, May
23, 2000.

P. 10.3200 - Letter to John Toll, Ph.D., Senior Project
10.3201 Manager, Parametrix, Inc., from Mr. John G.

Haggard, Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Hudson River Ecological Risk Assessment, May
23, 2000.

P. 10.3202 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
10.3252 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Comments on the Revised Baseline Modeling

114


-------
Report, December 19, 2000. (Attachment: Report:
Comments of the General Electric Company on Phase
2 Report - Review Copy, Further Site
Characterization and Analysis, Volume 2D - Revised
Baseline Modeling Report Hudson River PCBS
Reassessment RI/FS, prepared by the General
Electric Company, November, 2000.)

P. 10.3253 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
10.3427 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Comments on the EPA DEIR/LRC Responsiveness
Summary, December 19, 2000. (Attachment: Report:
Review by the General Electric Company of the US
EPA Responsiveness Summaries: DEIR and LRCR,
prepared by Quantitative Environmental Analysis,
LLC., and General Electric Company, December,
2000 . )

P. 10.3428 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
10.3568 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Response to EPA Comments on GE's Model,
December 19, 2000. (Attachment: Report: Response
of the General Electric Company to US EPA Comments
on the Report "PCBs in the Upper Hudson River",
prepared by Quantitative Environmental Analysis,
LLC., prepared for General Electric Company,
December, 2 0 0 0.)

P. 10.3569 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
10.3570 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from George W. Putman, Ph.D.,
Emeritus Faculty, Department of Earth &

Atmospheric Sciences, State University of New York
Albany, re: Comment on the Baseline Modeling
Report, undated.

P. 10.3605 - Proposed Agenda for General Electric EPA Meeting,

	10.3743 prepared by Hudson River Project, Corporate

Environmental Programs, General Electric Company,
November 6, 1995, facsimile date, October 31,
1995. (Attachments: (1) Letter to Mr. Douglas J.
Tomchuk, Remedial Project Manager, Emergency and

115


-------
Remedial Response Division, U.S. EPA, Region II,
from Mr. John G. Haggard, Engineering Project
Manager, GE Corporate Environmental Programs,
General Electric Company, re: Request for copy of
raw data from 1990 fish consumption survey, August
11, 1995; (2) Table: Data Sources for
MicroExposure Program of Fish Consumption for the
Hudson River, prepared by ChemRisk Division,
McLaren/Hart Environmental Engineering Corp.,
prepared for U.S. EPA Region II, November 6, 1995;
(3) Table: Definition of Variables Used in
MicroExposure Program of Fish Consumption for the
Hudson River, prepared by ChemRisk Division,
McLaren/Hart Environmental Engineering Corp.,
prepared for U.S. EPA Region II, November 6,
1995; (4) Table: MicroExposure Program of Fish
Consumption for the Hudson River Input.XLS,
prepared by ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., prepared for U.S.
EPA Region II, November 6, 1995; (5) Table:
MicroExposure Program of Fish Consumption for the
Hudson River Output.XLS, prepared by ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., prepared for U.S. EPA Region II, November
6, 1995; (6) Table: MicroExposure Program of Fish
Consumption for the Hudson River Macroh.XLS,
prepared by ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., prepared for U.S.
EPA Region II, November 6, 1995; (7) Description of
the Basic Approach to Model PCB Dose Rates from
the Consumption of Fish from the Upper Hudson
River, prepared by Paul S. Price, Ph.D.,
Supervising Health Scientist, ChemRisk Division,
McLaren/Hart Environmental Engineering Corp.,
prepared for U.S. EPA Region II, November 6, 1995;
(8) Software Issues, prepared by Ms. Cynthia L.
Curry, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., prepared for U.S.
EPA Region II, November 6, 1995; (9) Report: Monte
Carlo Modeling of Time-Dependent Exposures Using a
MicroExposure Event Approach, prepared by Paul S.
Price, Ph.D., Supervising Health Scientist,
ChemRisk Division, McLaren/Hart Environmental
Engineering Corp., Ms. Cynthia L. Curry, ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., Mr. Philip E. Goodrum, SUNY-College of
Environmental Science and Forestry; Mr. Michael N.
Gray, Department of Civil Engineering, Tri-State

116


-------
University; Ms. Jane I. McCrodden, ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., Ms. Natalie W. Harrington, ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., Ms. Heather Carlson-Lynch, ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp., Mr. Russell E. Keenan, ChemRisk Division,
McLaren/Hart Environmental Engineering Corp.,
prepared for Risk Analysis, undated.)

P. 10.3744 - Letter (w/ attachment) to Mr. Douglas J. Tomchuk,
10.3763 Remedial Project Manager, Emergency and Remedial
Response Division, U.S. EPA, Region II, from
Russell E. Keenan, Ph.D., National Director, Chief
Health Scientist - Managing Principal, ChemRisk
Division, McLaren/Hart Environmental Engineering
Corp. and Mr. Paul S. Price, Supervising Health
Scientist, ChemRisk Division, McLaren/Hart
Environmental Engineering Corp., re: Response to
EPA questions, February 15, 1996.

P. 10.3764 - Facsimile to Ms. Marian Olsen, U.S. EPA, Region
10.3767 II, from Ms. Jackie Moya, Exposure Assessment
Group, Office of Health & Environmental
Assessment, Office of Research & Development, U.S.
EPA, re: Attached are our comments on the ChemRisk
reports re: Hudson River, undated, facsimile date
March 13, 1995.

P. 10.3768 - Letter to Mr. Doug Tomchuk, Regional Project

10.3772	Manager, Eastern New York/Caribbean Compliance
Branch, Emergency and Remedial Response Division,
from Mr. Frank Csulak, Coastal Resource
Coordinator, U.S. Department of Commerce, National
Oceanic and Atmospheric Administration, re:
Comments on the Phase I Work Plan, Preliminary
Reassessment, Hudson River PCB Reassessment RI/FS,
February 19, 1991.

P. 10.3773 - Memorandum to Hudson River PCB Steering Committee

10.3773	from Ms. Bridget Barclay, Hudson River Sloop
Clearwater Inc., Chair, Environmental Liaison
Group and Mr. Carl Deppe, CEASE, Co-Chair,
Environmental Liaison Group, re: Comments on the
Phase I Work Plan, March 12, 1991.

117


-------
P. 10.3774 - Memorandum from Mr. William D. Bradley, re:

10.3775	Comments on Review Copy, Phase 1 Work Plan
Preliminary Reassessment, March 18, 1991.

P. 10.3776 - Letter to Mr. Douglas Tomchuk, Regional Project

10.3776	Manager, U.S. EPA, Region II, from Arthur C.

Upton, M.D., Professor and Director, NYU Medical
Center, Institute of Environmental Medicine, re:
Review of the Phase 1 Work Plan Preliminary
Reassessment and the Scope of Work for the Hudson
River PCB Reassessment RI/FS, March 18, 1991.

P. 10.3777 - Memorandum to Mr. Douglas Tomchuk, Regional

10.3777	Project Manager, U.S. EPA, Region II, from Ms.
Judith S. Weis, Dept. of Biological Sciences,
Rutgers University, Newark, NJ, re: Comments on
the Hudson River PCB Reassessment RI/FS Work Plan
and Scope of Work, March 19, 1991.

P. 10.3778 - Letter to Mr. Douglas Tomchuk, Regional Project

10.3783	Manager, U.S. EPA, Region II, from Mr. William T.
Ports, Environmental Engineer 2, Bureau of Central
Remedial Action, Division of Hazardous Waste
Remediation, NYS DEC, re: Comments on the Phase 1
Work Plan for Hudson River PCB Reassessment
Project, March 21, 1991.

P. 10.3784 - Letter to Mr. Douglas J. Tomchuk, Project Manager,

10.3784	Hudson River PCBs Site, U.S. EPA, Region II, from
Brian Bush, Ph.D., re: Comments on TAMS
Consultants, Inc. documents of December and
January, April 2, 1991.

P. 10.3785 - Report: Agricultural Liaison Group, Phase 1

10.3787 Report, Hudson River Oversight Committee, prepared
by Mr. Thomas A. Borden, Chairman, Agricultural
Liaison Group, April 4, 1991.

P. 10.3788 - Letter to Mr. Douglas J. Tomchuk, Remedial Project

10.3836 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Technical Project Manager, General
Electric Company, re: Comments on the Phase 2A
Sampling Plan for the Hudson River PCB
Reassessment, September 24, 1991. (Attachments:
(1) Appendix A: "Comments by General Electric
Company on the U.S. Environmental Protection
Agency's Phase 2A Sampling and Analysis Plan,
Hudson River Reassessment RI/FS", September 24,

118


-------
1991; (2) Transcript: in the Matter of the Meeting
of the Scientific and Technical Committee, Holiday
Inn, Latham, New York, prepared by Ms. Pauline E.
Williman, Certified Shorthand Reporter, July 11,
1991.)

P. 10.3837 - Letter to Mr. Douglas Tomchuk, Hudson River PCBs

10.3904	Site Project Manager, U.S. EPA, Region II from Ms.
Leslie S. Safian, Proskauer Rose Goetz &
Mendelsohn, re: GE Comments, October 28, 1991.
(Attachment: Report: Evaluation of the Toxicology
of PCBs, prepared by Kenneth H. Chase, M.D., John
Doull, M.D., Ph.D., Seymour Friess, Ph.D., Joseph
V. Rodricks, Ph.D., Stephen H. Safe, Ph.D. with
assistance from ENVIRON Corporation, Washington,
D.C., prepared for Texas Eastern Gas Pipeline
Company, Houston, Texas, March 1, 1989.)

P. 10.3905 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3905	U.S. EPA, Region II, from Mr. William T. Ports,
Environmental Engineer 2, Bureau of Central
Remedial Action, Division of Hazardous Waste
Remediation, NYS DEC, re: Comments on the Phase 1
Report "Interim Characterization and Evaluation,
Hudson River PCB Reassessment RI/FS", November 4,
1991.

P. 10.3906 - Letter to Dr. Daniel Abramowicz, Biological

10.3906	Science Laboratory, General Electric Company, from
Donald B. Aulenbach, Ph.D., P.E., re: Comments on
the Phase 2A Sampling Plan for the Hudson River
PCB Reassessment RI/FS, November 6, 1991.

P. 10.3907 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3917 U.S. EPA, Region II, from Ms. Cara Lee,

Environmental Director, Scenic Hudson Inc., re:
Hudson River Reassessment Process, November 6,
1991. (Attachment: Scenic Hudson's Comments on
Synopses for the Phase I Report Interim
Characterization and Evaluation, Hudson River PCB
Reassessment RI/FS, prepared by Scenic Hudson
Inc., prepared for U.S. EPA, Region II, November
6, 1991.)

P. 10.3918 - Letter to All Interested Parties from Mr. Douglas

10.3919 J. Tomchuk, Project Manager, Hudson River PCBs
Site Reassessment, U.S. EPA, Region II, re:

119


-------
Changes to the Review Copy of the Phase 2 Work
Plan, June 18, 1992.

P. 10.3920 - Report: General Electric Co's Preliminary Comments

	10.3921 on EPA's Phase II Work Plan and Sampling Plan,

Hudson River PCBs Reassessment RI/FS, July 1992.

P. 10.3922 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3927	U.S. EPA, Region II, from Ms. Judy A. Velsor,
resident, re: response to Phase 2, 07/10/92.

P. 10.3928 - Letter to Mr. Douglas J. Tomchuk, Environmental

10.3928	Engineer Emergency/Remedial Response, U.S. EPA,
Region II, from Robert V. Thomann, Professor,
Manhattan College, re: the Phase II Report, July
17, 1992.

P. 10.3929 - Letter to Mr. Douglas Tomchuk, Remedial Project

10.3933 Manager, Superfund, U.S. EPA, Region II, from Mr.

Peter M. Balet, Chairman, Environmental Management
Council, Saratoga County, July 21, 1992.
(Attachment: Comments on EPA's Hudson River PCB
Reassessment Phase 2 Work Plan, dated June 21,
1992 . )

P. 10.3934 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3947 New York/Caribbean Superfund Branch II, Emergency
and Remedial Response Division, U.S. EPA, from Mr.
L. Jay Field, Marine Biologist, U.S. Department of
Commerce, National Oceanic and Atmospheric
Administration, Office of Ocean Resources
Conservation and Assessment, July 22, 1992.
(Attachments: (1) Lower Hudson River Proposed
Sediment Sampling Plan, Draft, July 22, 1992; (2)
NOAA's Comments on the Hudson River Phase 2 Work
Plan and Sampling Plan, Draft, July 22, 1992.)

P. 10.3948 - Report: Comments on Phase 2 Work Plan, Hudson

	10.3949 River PCB Reassessment RI/FS, prepared by Mr.

Thomas A. Borden, Chairman, Agricultural Liaison
Group, July 23, 1992.

P. 10.3950 - Letter to Mr. Douglas Tomchuk, Project Manager,
10.3950 U.S. EPA, Region II, from Ms. Judy Schmidt-Dean,

Chair, Citizens Liaison Group, re: Comments on the
Phase II Work Plan and Sampling Plan, July 24,
1992 .

120


-------
P. 10.3951 - Letter to Mr. Douglas Tomchuk, Project Manager,
10.3960 U.S. EPA, Region II, from Mr. William T. Ports,

P.E., Environmental Engineer 2, Bureau of Central
Remedial Action, Division of Hazardous Waste
Remediation, NYS DEC, re: Hudson River PCB
Reassessment RI/FS, Site No. 5-46-031, July 24,
1992. (Attachment: "Vertebrate Species for
Consideration as Part of the Ecological Risk
Assessment".)

P. 10.3961 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3965 U.S. EPA, from Ms. Bridget Barclay, Environmental
Director, Hudson River Sloop Clearwater, Inc., re:
Comments on the Phase 2 Work Plan and Sampling
Plan for the Hudson River PCB Reassessment RI/FS,
July 30, 1992.

P. 10.3966 - Letter to Mr. Douglas Tomchuk, Remedial Project
10.3969 Manager, New York/Caribbean Superfund Branch II,
Emergency and Remedial Response Division, U.S.
EPA, Region II, from Mr. Frank G. Csulak and Ms.
Diane E. Wehner, Coastal Resource Coordinators,
National Ocean Service, Office of Oceanography and
Marine Assessment, re: Hudson River PCB Site
Revised RI/FS Work Plan, September 29, 1992.
(Attachment: Memorandum to Mr. Jay Field and Ms.
Diane Wehner from Ms. Mary Matta, re: Review of
Phase 2 Workplan Hudson River, September 28,

1992 . )

P. 10.3970 - Minutes: U.S. EPA, Hudson River PCB Reassessment

10.3972	Community Interaction Program, Steering Committee
Meeting, Latham, New York, September 24, 1997.

P. 10.3973 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3973	U.S. EPA, Region II, from Ms. Cara Lee,
Environmental Director, Scenic Hudson, Inc., re:
Siting Survey Comments, February 17, 1998.

P. 10.3974 - Letter to Mr. Douglas Tomchuk, Project

10.3977 Manager U.S. EPA, Region II, from Ms. Merrilyn

Pulver, Chair and Councilwomen of The Town of Fort
Edward's Landfill Committee, re: Comments on EPA
Landfill/Treatment Facility Siting Survey Report,
February 17, 1998.

121


-------
P. 10.3978 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3980	U.S. EPA, Region II, from Mr. William T. Ports,
Remedial Section A, Bureau of Central Remedial
Action, NYS DEC, re: Comments on the July 1998
Hudson River PCBs Reassessment RI/FS Reports,
August 31, 1998.

P. 10.3981 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3981	U.S. EPA, Region II, from Donald B. Aulenbach,
Ph.D., P.E., DEE, Environmental Engineering
Consultant, re: Comments on "Evaluation of Removal
Action Alternatives Thompson Island Pool Early
Assessment", April 14, 1999.

P. 10.3982 - Letter to Mr. Douglas Tomchuk, Project Manager,

10.3983 U.S. EPA, Region II, from George W. Putman, Ph.D.,
Emeritus Faculty, University at Albany, State
University of New York, re: Review of the Response
Summaries for the Human Health and Ecological Risk
Assessment SOWs, July 1, 1999.

P. 10.3984 - Letter to Ms. Alison A. Hess, C.P.G., U.S. EPA,
10.3985 Region 2, from Brian Bush, Ph.D., F.R.S.C., re:
Comments referring to neurological effect of PCB
in mammals, August 25, 1999.

P. 10.3986 - Transmittal Letter to Mr. Douglas Tomchuk, Project
10.4044 Manager, U.S. EPA, Region II, from Mr. Melvin B.

Schweiger, Manager, Hudson River Project, NYS EHS
Affairs, General Electric Company, November 2,
1998. (Attachment: Comments of General Electric
Company on Hudson River PCBs Reassessment RI/FS
Phase 3 Feasibility Study Scope of Work, November
2, 1998.)

P. 10.4045 - Memorandum to Mr. William Ports, NYS DEC, from Mr.
10.4053 Richard Bopp, re: Report on Task 1, December 20,
1998 .

P. 10.4054 - Transmittal Letter to Ms. Alison Hess, Project

10.4084 Manager, U.S. EPA, Region II, from Mr. William T.

Ports, P.E., Project Manager, Bureau of Central
Remedial Action, Division of Environmental
Remediation, NYS DEC, September 7, 1999.
(Attachments: (1) Comments on August 1999 Phase 2
Report-Review Copy, Further Site Characterization
and Analysis, Volume 2F-Human Health Risk
Assessment, Hudson River PCBs Reassessment RI/FS,

122


-------
prepared by the NYS Department of Health,

September 7, 1999; (2) Comments on March 31 1998
Phase 2 Hudson River PCBs Site Human Health Risk
Assessment Scope of Work, prepared by the NYS
Department of Health, May 20, 1998.)

P. 10.4085 - Letter to Ms. Alison A. Hess, C.P.G., U.S. EPA,

10.4091 Region II, from Mr. George Hodgson, Jr., Director,
Environmental Management Council, Saratoga County,
re: Corrected versions of HHRA and ERA comments,
October 1, 1999. (Attachment: Comments on the
Phase 2 Human Health Risk Assessment, Volume 2F,
Book 1; August 1999, Hudson River PCBs
Reassessment RI/FS, prepared by Mr. David D.

Adams, Member, Saratoga County EMC and Government
Liaison Committee, August 30, 1999.)

P. 10.4092 - Letter to Ms. Alison A. Hess, U.S. EPA, Region II,
10.4139 from Mr. David A. Stilwell, Field Supervisor, Fish
and Wildlife Service, Department of the Interior,
re: Comments pertaining to the August 1999
"Baseline Ecological Risk Assessment", October 4,
1999. (Attachment: Laboratory Report
"Organochlorine Contaminants in Biota from the
Hudson River, New York", prepared by Organic
Chemistry Section of Columbia Environmental
Research Center, U.S. Geological Survey-Biological
Resources Division, September 1999.)

P. 10.4140 - Memorandum (w/attachment) to Ms. Alison Hess,

10.4142 U.S. EPA, Region II, from Mr. Rich Schiafo, Scenic
Hudson, Inc., re: Hudson River HHRA/ERA Addendum
Comments, January 28, 2000.

P. 10.4143 - Letter to Ms. Alison A. Hess, C.P.G., U.S. EPA,
10.4196 Region II, from Mr. John G. Haggard, Manager,

Hudson River Program, General Electric Company,
February 4, 2000. (Attachment: Comments of
General Electric Company on Hudson River PCBs
Reassessment RI/FS Phase 2 Baseline Ecological
Risk Assessment for Future Risks in the Lower
Hudson River, prepared by LWB Environmental
Services, Inc. and Quantitative Environmental
Analysis, Inc., prepared for General Electric
Company, February 4, 2000.)

123


-------
P. 10.4197 - Report: Comments on the Phase 2 Work Plan Hudson

10.4200 River PCB Reassessment RI/FS, prepared by Mr. Paul
McDowell, Local Issues Specialist, New York Farm
Bureau, Inc., undated.

P. 10.6170 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
10.6171 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Engineering Project Manager, Hudson River
Project, General Electric Company, re: Hudson
River RI/FS - Availability of

Information/Administrative Record, July 3, 1991.

P. 10.6172 - Letter to Mr. Douglas J. Tomchuk, Remedial Project
10.6178 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Engineering Project Manager, Hudson
River, General Electric Company, re: Factors
Affecting PCB Intake from Fish Consumption,
November 19, 1991. (Attachment: Article:
Contaminants in Sport Fish: Managing Risks,
prepared by Ken Gall and Michael Voiland,
published by Cornell Cooperative Extension, Sea
Grant Extension, June 1990.)

P. 10.6179 - Letter to Mr. Stephen D. Ramsey, Vice President,

10.6181 Corporate Environmental Programs, General Electric
Company, from Mr. Constantine Sidamon-Eristoff,
Regional Administrator, U.S. EPA, Region II, re:
Response to GE's Comments regarding the Phase 1
report, December 16, 1991. (Attachment: Letter to
Mr. Douglas Tomchuk, Hudson River PCBs Site
Project Manager, U.S. EPA, Region II, from Mr.

John H. Claussen, Manager - Hudson Project Team,
General Electric Company, re: GE's comments on
EPA's Phase 1 report, October 24, 1991.)

P. 10.6182 - Letter to Mr. Douglas R. Blazey, Regional Counsel,
10.6184 U.S. EPA, Region II, from Mr. John H. Claussen,

Counsel, Corporate Environmental Programs, General
Electric Company, re: Upcoming open liaison
committee meeting, May 29, 1992. (Attachment:
Article: PCBs in Hudson still dropping, scientist
says, published by Rockland Journal News, NY,
5/13/92 . )

P. 10.6185 - Letter to Mr. John H. Claussen, Corporate

10.6186 Environmental Programs, General Electric Company,
from Mr. Douglas J. Tomchuk, Project Manager,
Eastern New York/Caribbean Section II, U.S. EPA,

124


-------
Region II, re: Joint Liaison Group Meeting, June
16, 1992.

P. 10.6187 - Letter to Mr. Douglas R. Blazey, Regional Counsel,
10.6188 U.S. EPA, Region II, from Mr. John H. Claussen,

Counsel, Corporate Environmental Programs, General
Electric Company, re: Hudson Reassessment, June
22, 1992. (Attachment: Proposed Enhancement of
EPA's CIP Process, June 18, 1992.)

P. 10.6189 - Memorandum (w/attachments) to Mr. A1 DiBernardo,
10.6204 TAMS, from Mr. Ronald B. Aububach, New York State
Society of Professional Engineers, July 13, 1992.

P. 10.6205 - Letter to Mr. Douglas Tomchuk, Remedial Project

10.6207	Manager, U.S. EPA, Region II, from Ms. Cara Lee,
Environmental Director, Scenic Hudson, Inc., re:
Comments on Phase 2 Work Plan and Sampling Plan:
Hudson River PCB Reassessment RI/FS, July 20,

1992 .

P. 10.6208 - CEASE (?) Comments on Phase II Work Plan, Ms.

10.6208	Sharon Ruggi, July, 1992.

P. 10.6209 - Letter to Ms. Kathleen C. Callahan, Acting Deputy
10.6212 Regional Administrator, U.S. EPA, Region II, from
Mr. M. Peter Lanahan, Jr., Manager, Hudson River
Project, General Electric Company, re: Phase 3,
Hudson River Reassessment - Feasibility Study,
February 23, 1994.

P. 10.6213 - Letter to Mr. M. Peter Lanahan, Jr., Manager,

10.6214 Hudson River Project, General Electric Company,

from Ms. Kathleen C. Callahan, Director, Emergency
and Remedial Response Division, U.S. EPA, Region
II, re: Hudson River PCBs Site - Feasibility
Study, April 29, 1994.

P. 10.6215 - Letter to Mr. M. Peter Lanahan, Jr., Manager,

10.6216 Hudson River Project, General Electric Company,

from Ms. Kathleen C. Callahan, Director, Emergency
and Remedial Response Division, U.S. EPA, Region
II, re: Hudson River PCBs Site - Reassessment
RI/FS, June 23, 1994.

P. 10.6217 - Letter to Mr. Douglas Tomchuk, Remedial Project

10.6219 Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. John G. Haggard,

125


-------
Engineering Project Manager, Hudson River Project,
General Electric Company, re: Hudson River
Reassessment RI/FS - Feasibility Study, September
9, 1994.

P. 10.6220 - Letter (w/attachment) to Mr. Douglas Tomchuk,

10.6222 Remedial Project Manager, Emergency and Remedial
Response Division, U.S. EPA, Region II, from Mr.
John G. Haggard, Engineering Project Manager,
Hudson River Project, General Electric Company,
re: Comments on the U.S. EPA Hudson River
Database, May 29, 1996.

P. 10.6223 - Letter to Ms. Jeanne M. Fox, Regional

10.6224	Administrator, Region II, U.S. EPA, from Mr. Peter
M. Balet, Chairman, Saratoga County Environmental
Management Council, re: Comments relative to
Hudson River PCBs Superfund Reassessment's public
participation process, April 8, 1997.

P. 10.6225 - Letter to Ms. Jeanne M. Fox, Regional

10.6225	Administrator, U.S. EPA, Region II, from Mr.
Stephen D. Ramsey, Vice President-Corporate
Environmental Programs, General Electric Company,
re: Hudson River PCB Superfund Site, November 17,
1997 .

P. 10.6226 - Letter to Mr. Stephen D. Ramsey, Vice President -

10.6226	Corporate Environmental Programs, General Electric
Company, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Hudson River PCBs
Administrative Record, December 22, 1997.

P. 10.6227 - Letter to Mr. William Muszynski, Deputy Regional

10.6230 Administrator, U.S. EPA, Region II, from Honorable
Gerald B.H. Solomon, Member of Congress, re:
Recommendations with respect to the future of
EPA's reassessment of Hudson River conditions,
January 7, 1997. (Note: The correct date of
letter is January 7, 1998.)

Letter to Mr. William McCabe, Deputy Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, from Mr. Peter Balet, Chairman,
Saratoga County Environmental Management Council,
re: Feedback from public concerning problems with

P. 10.6231 -
10.6234

126


-------
timely dissemination of information regarding
Hudson River PCBs reassessment, January 13, 1998.

P. 10.6235 - Letter to Honorable Gerald B. Solomon, U.S. House
10.6237 for Representatives, from Mr. William J.

Muszynski, P.E., Deputy Regional Administrator,
U.S. EPA, Region II, re: EPA's program of public
participation, January 21, 1998.

P. 10.6238 - Letter to Mr. William Muszynski, Deputy Regional

10.6241 Administrator, U.S. EPA, Region II, from Honorable
Gerald B.H. Solomon, Member of Congress, re:

Hudson River Oversight Committee meeting in
Latham, February 25, 1998. (Attachment: Letter to
Honorable Gerald B. Solomon, U. S. House of
Representatives, from Mr. William J. Muszynski,
P.E., Deputy Regional Administrator, U. S. EPA,
Region II, re: response to February 25, 1998
letter, undated.)

P. 10.6242 - Letter to Mr. Melvin B. Schweiger, Manager, Hudson
10.6244 River Project, General Electric Company, from Mr.

William McCabe for Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Hudson River PCBs Superfund
Site, September 3, 1998.

P. 10.6245 - Letter (w/attachments) to Ms. Jeanne M. Fox,

10.6250 Regional Administrator, U.S. EPA, Region II, from
Mr. Stephen D. Ramsey, Vice President, Corporate
Environmental Programs, General Electric Company,
re: Low Resolution Coring report, October 6, 1998.

P. 10.6251 - Letter to Mr. Richard Caspe, Director, Emergency

10.6252	and Remedial Response Division, U.S. EPA, Region
II, from Mr. Melvin B. Schweiger, Manager, Hudson
River Project, General Electric Company, re: GE's
questions about the validity of the analysis
conducted by EPA's contractor, October 27, 1998.

P. 10.6253 - Letter to Mr. William McCabe, Deputy Director,

10.6253	Emergency and Remedial Division, U.S. EPA, Region,
II, from Mr. John G. Haggard, Engineering Project
Manager, Hudson River Project, General Electric
Company, re: Hudson River-Data Report Peer Review,
February 19, 1999.

127


-------
P. 10.6254 - Letter to Mr. John G. Haggard, Project Manager,

10.6254 General Electric Company, from Mr. William McCabe,
Deputy Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Hudson River
PCBs Site - Peer Review of Data Evaluation and
Interpretation Report (DEIR) and Low Resolution
Sediment Coring Report (LRC), March 9, 1999.

P. 10.6255 - Letter to Administrator Carol Browner, U.S. EPA,
10.6256 from Honorable John E. Sweeney, Member of

Congress, re: Hudson River PCBs Superfund Site,
April 21, 1999.

P. 10.6257 - Letter to The Honorable John E. Sweeney, House
10.6260 of Representatives, from Ms. Carol M. Browner,
Administrator, U.S. EPA, re: Comments on the
Hudson River PCBs Superfund Site made before the
House Appropriations Committee, June 10, 1999.

P. 10.6261 - Letter to Mr. John G. Haggard, Manager, Hudson

10.6264	River PCB Projects, General Electric Company, from
Ms. Alison A. Hess, C.P.G., Project Manager,

Hudson River PCBs Site, U.S. EPA, Region II, re:
Hudson River PCBs Reassessment, Human Health and
Ecological Risk Assessments, October 21, 1999.
(Attachment: Letter to Ms. Alison A. Hess, C.P.G.,
Project Manager, U.S. EPA, Region II, from Mr.

John G. Haggard, Manager, Hudson River Project,
General Electric Company, re: Hudson River Human
Health Risk Assessment - Request for Supplemental
Information, September 17, 1999.)

P. 10.6265 - Letter to Mr. John G. Haggard, Manager, Hudson

10.6265	River Projects, General Electric Company, from Ms.
Alison A. Hess, C.P.G., Project Manager, U.S. EPA,
Region II, re: Hudson River PCBs Reassessment,
Human Health and Ecological Risk Assessments,
December 9, 1999.

P. 10.6266 - Letter to Ms. Alison A. Hess, C.P.G., Project
10.6267 Manager, U.S. EPA, Region II, from Mr. John G.

Haggard, Manager, Hudson River Project, General
Electric Company, re: Request for Additional
Information, Mid-Hudson River Human Health Risk
Assessment/Lower Hudson River Future Ecological
Risk Assessment, January 7, 2000.

128


-------
P. 10.6268 - Letter to Mr. John G. Haggard, Manager, Hudson

10.6269 River Project, General Electric Company, from Ms.

Alison A. Hess, C.P.G., Project Manager, U.S. EPA,
Region II, re: Human Health Risk Assessment for
the Mid-Hudson River, Ecological Risk Assessment
for Future Risks in the Lower Hudson River,

January 20, 2000.

P. 10.6270 - Letter to Mr. John G. Haggard, Manager, Hudson

10.6272 River PCB Program, General Electric Company, from
Mr. William McCabe, Deputy Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: Hudson River PCBs Superfund Site, May 11,

2000 .

P. 10.6273 - Letter (w/attachments) to Mr. John G. Haggard,
10.6281 Manager, Hudson River PCBs Project, General

Electric Company, from Ms. Alison A. Hess, C.P.G.,
Project Manager, Hudson River PCBs Site, U.S. EPA,
Region II, re: Hudson River PCBs Reassessment
RI/FS, September 8, 2000.

Letter to Angus Macbeth, Esq., Sidley & Austin,
from Mr. Walter E. Mugdan, Regional Counsel, U.S.
EPA, Region II, re: Hudson River PCB Superfund
Site, September 29, 2000.

P. 10.6284 - Letter to Mr. William McCabe, Deputy Director,
10.6286 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. George Hodgson, Jr.,
Director, Saratoga County Environmental Management
Council, re: Hudson River PCBs Superfund Site,
October 26, 2000.

P. 10.6287 - Letter to Mr. Richard L. Caspe, Director,

10.6289 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. John G. Haggard, Manager,
Hudson River Program, General Electric Company,
re: Size of Environmental Dredging Projects, March
8, 2001.

P. 10.6290 - Letter to Honorable Christine Todd Whitman,

10.6295 Administrator, U.S. EPA, from Robert J. Kafin,
Esq., Proskauer Rose LLP, re: Hudson River PCBs
Superfund Site, March 21, 2001. (Attachment: (1)
Letter to Robert J. Kafin, Esq., Proskauer Rose
LLP, from Ms. Kathleen C. Callahan, for Mr.

William J. Muszynski, P.E., Acting Regional

P. 10.6282 -
10.6283

129


-------
Administrator, U.S. EPA, Region II, re: Hudson
River PCBs Superfund Site, March 15, 2001; (2)
Letter to Honorable Christine Todd Whitman,
Administrator, U.S. EPA, from Robert J. Kafin,
Esq., Proskauer Rose LLP, re: Hudson River PCBs
Superfund Site, February 15, 2001.)

P. 10.6296 - Letter (w/attachment) to Mr. Richard L. Tomer,

10.6298 Acting Chief, Regulatory Branch, U.S. Army Corps

of Engineers, from Mr. Douglas J. Tomchuk, Project
Manager, Hudson River PCBs Site, U.S. EPA, Region
II, re: Town of Halfmoon Water Intake, Public
Notice Number 2001-00291-YN, June 1, 2001.

P. 10.6299 - Letter to Robert J. Kafin, Esq., Proskauer Rose
10.6301 LLP, from Mr. William J. Muszynski, P.E., Acting
Regional Administrator, U.S. EPA, Region II, re:
Hudson River PCBs Superfund Site, July 6, 2001.

P. 10.6302 - Comments from Mr. John E. Sanders, Chairman,

10.6308 Hudson River PCB Settlement Advisory Committee,
Adjunct Star Professor of Geology, Hofstra
University, re: Comments on U.S. EPA Phase 2 Work
Plan, undated.

P. 10.10378 -Report (w/attachments): A Citizen's Guide to PCB

	10.10408 Problems in West Glens Falls, NY, prepared by

Toxics Targeting, Inc., 2001.

P. 10.10409 -Memorandum to EPA Science and Technical

10.10411 Committee, from Mr. Daniel Abramowicz, General
Electric Company, re: Phase II Comments, July
9,1992.

P. 10.10412 -Letter to Ms. Kathleen Marchione, Clerk of the

10.10413 Board of Supervisors, County of Saratoga, from Mr.

Richard L. Caspe, Director, Emergency and Remedial
Response, U.S. EPA, Region II, re: Response to
October 21, 1997 letters, December 2, 1997.

P. 10.10414 -Letter to Mr. William McCabe, Deputy Director,

10.10414 U.S. EPA, Region II, and Mr. John Haggard, Hudson
River Project Manager, General Electric Company,
from Ms. Merrilyn Pulver, Agricultural Liaison,
Committee Co-Chairman, Fort Edward Town
Councilwoman, re: Request for public meeting,
August 17, 1999.

130


-------
P. 10.10415 -Letter to Honorable Jeanne Fox, Regional

10.10415 Administrator, U.S. EPA, Region II, from Mr. John
G. Haggard, Manager, Hudson River Program, General
Electric Company, re: Hudson River PCBs RRI/FS
Site, November 22, 2000. (NOTE: The petitions and
postcards referenced in this letter are maintained
in the site file for the Hudson River PCBs
Superfund Site, as these materials were submitted
outside of the public comment period. These
materials may be viewed at the Region II Superfund
Remedial Record Center. All resolutions submitted
to the Agency may be found in Section 10.1 of the
Administrative Record.)

-Letter to the Honorable Christine Whitman,
Administrator, U.S. EPA, from Honorable John E.
Sweeney, Member of Congress, re: List of requests
to White House concerning decision to implement
predecessor's plan to dredge the Hudson River,
August 1, 2001.

-Letter to Mr. Edward 0. Sullivan, Scenic Hudson,
Inc., from Honorable Christine Todd Whitman,
Administrator, U.S. EPA re: Support for proposed
cleanup of PCBs from Upper Hudson River, September
10, 2001.

-Letter (w/attachments) to Ms. Alison Hess and Mr.
Douglas Tomchuk, U.S. EPA, Region II, from Mr.

John G. Haggard, Manager, Hudson River Program,
General Electric Company, re: Supplemental
Comments of General Electric Company on the
Feasibility Study and Proposed Plan for the Hudson
River PCBs Superfund Site, October 12, 2001.

10.1 Comments and Responses - Resolutions

001-0223-0224 Resolution Opposing Dredging Project of the Hudson
River and Encouraging General Electric Scientists
To Continue Efforts to Develop Natural
Biodegradation of PCBs, from Harold E. Robillard,
Clerk, prepared by Warren County Board of
Supervisors by, December 6, 1990.

P. 10.5396 - Memorandum to U.S. EPA, from Ms. Kathleen A.

10.5397 Marchione, Supervisor, Town of Halfmoon, Board of
Supervisors, Saratoga County, re: Reassessment

p. 10.10621
10 .10621

P. 10.10622
10 .10623

P. 10.10624
10.10630

131


-------
Remedial Investigation & Feasibility Study of
PCBs in the Hudson River, December 11, 1990.
(Attachment: Resolution No. 113, prepared by Town
Board, Town of Halfmoon, March 6, 1990.)

P. 10.5398 - Letter from Mr. Ardis Anderson, Clerk, Saratoga
10.5403 County, re: Copies of resolutions adopted on

March 20, 1990. (Attachments: (1) Resolution No.
76 of 1990, In Opposition to the Dredging of the
Hudson River, prepared by Board of Supervisors,
Saratoga County, March 20, 1990; (2) Resolution
No. 77 of 1990, Opposing the 1990 Environmental
Quality Bond Act, prepared by Board of
Supervisors, Saratoga County, March 20, 1990.)

P. 10.5404 - Letter to Ms. Mary J. Pearson, Town Clerk, Town
10.5405 of Halfmoon, from Mr. Constantine Sidamon-
Eristoff, Regional Administrator, U.S. EPA,

Region II, re: Town of Halfmoon Resolution No.
113, April 16, 1990.

P. 10.5406 - Letter from Mr. Harold E. Robillard, Clerk,

10.5409	Warren County Board of Supervisors, re: Copy of
resolution adopted on December 6, 1990.
(Attachment: Resolution No. 502 of 1990, Opposing
Dredging Project of the Hudson River and
Encouraging General Electric Scientists to
Continue Efforts to Develop Natural
Biodegradation of PCBs, prepared by Board of
Supervisors, Warren County, December 6, 1990.)

P. 10.5410 - Letter to Honorable Merrilyn Pulver,

10.5410	Councilwoman, Town of Fort Edward, from Mr.
Michael P. Glavin, Supervisor, Town of
Schodack, re: Hudson River PCB Dredging Project,
May 29, 1997.

P. 10.5411 - Letter to Ms. Merrilyn Pulver, Councilwoman, Town

10.5411	of Fort Edward, from Mr. Wallace H. Estill,
Village Clerk, Village of Corinth, re: PCB Dredge
-and-Landfill Project, June 9, 1997.

P. 10.5412 - Resolution No. 9, Opposing Dredging of the Upper
10.5413 Hudson River and Creation of a Toxic Waste

Landfill, prepared by Town of White Creek, June
10, 1997.

132


-------
P. 10.5414 - Letter to Ms. Daphane Wade, Town Clerk, Town of
10.5418 Hampton, from Ms. Jeanne M. Fox, Regional

Administrator, U.S. EPA, Region II, re: Town of
Hampton resolution opposing dredging, June 27,
1997. (Attachments: (1) Resolution No. 15 of
1997, prepared by Town Board of Town of Hampton,
May 21, 1997; (2) Letter to Mr. Peter Genier,
Supervisor, Town of Hampton, from Mr. Wiley W.
Lavigne, P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:
Resolution, June 26, 1997.)

P. 10.5419 - Letter to Ms. Linda Miles, Town Clerk, Town of
10.5425 Fort Edward, from Ms. Jeanne M. Fox, Regional

Administrator, U.S. EPA, Region II, re: Town of
Fort Edward resolutions opposing dredging, June
30, 1997. (Attachments:(1) Letter to Honorable
Jeanne M. Fox, Regional Administrator, U.S. EPA,
Region II, from Ms. Linda Miles, Town Clerk, Town
of Fort Edward, re: Resolutions No. 47 and 49,
May 20, 19 97; (2) Resolution No. 47 of 1997,
prepared by Town Board of Town of Fort Edward,
May 12, 19 97; (3) Resolution No. 49 of 1997,
prepared by Town Board of Town of Fort Edward,
May 12, 1997.)

P. 10.5426 - Letter to Honorable C. Michael Cronin, Mayor,

10.5432 Village of Hudson Falls, from Ms. Jeanne M. Fox,
Regional Administrator, U.S. EPA, Region II, re:
Village of Hudson Falls resolution opposing
dredging, June 30, 1997. (Attachments: (1)

Letter to Honorable Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, from
Honorable C. Michael Cronin, Mayor, Village of
Hudson Falls, re: PCB Dredge-and-Landfill
Project, June 6, 1997; (2) Resolution, prepared
by Board of Trustees, Village of Hudson Falls,
June 6, 1997; (3) Letter to Honorable C. Michael
Cronin, Mayor, Village of Hudson Falls, from Mr.
Wiley W. Lavigne, P.E., Regional Engineer, New
York State Department of Environmental
Conservation, re: Resolution, June 23, 1997.)

P. 10.5433 - Letter to Ms. Elizabeth A. Hudson, Village Clerk,
10.5437 Village of Castleton-on-Hudson, from Ms. Jeanne
M. Fox, Regional Administrator, U.S. EPA, Region
II, re: Village of Castleton-on-Hudson
resolution opposing dredging, June 30, 1997.

133


-------
(Attachments: (1) Letter to Honorable Jeanne M.
Fox, Regional Administrator, U.S. EPA, Region II,
from Ms. Elizabeth A. Hudson, Village Clerk,
Village of Castleton-on-Hudson, re: Resolution
Supporting Fort Edward, June 4, 1997; (2)
Resolution No. 10 of 1997, Opposing Dredging of
the upper Hudson River and Creation of a Toxic
Waste Landfill, prepared by Village of Castleton-
on-Hudson, undated.)

P. 10.5438 - Letter to Ms. Carrie A. Whitney, Clerk,Washington
10.5445 County Board of Supervisors, from Ms. Jeanne M.

Fox, Regional Administrator, U.S. EPA, Region II,
re: Washington County resolution opposing
dredging, June 30, 1997. (Attachments: (1)
Memorandum to Ms. Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, from Ms.
Carrie A. Whitney, Clerk, Washington County Board
of Supervisors, re: Resolution No. 164, May 20,
1997; (2) Resolution No. 164, May 16, 1997,
prepared by Washington County Board of
Supervisors); (3) Letter to Mr. R. Harry Booth,
Chairman, Washington County Board of Supervisors,
from Mr. Stuart A. Buchanan, Regional Director -
Region 5, New York State Department of
Environmental Conservation, re: Resolution No.
164, June 4, 1997.)

P. 10.5446 - Letter to Ms. Holly E. Mabb, Town Clerk, Town of
10.5452 Kingsbury, from Ms. Jeanne M. Fox, Regional

Administrator, U.S. EPA, Region II, re: Town of
Kingsbury resolution opposing dredging, July 16,
1997. (Attachments: (1) Letter to Honorable
Carol Browner, Administrator, U.S. EPA, from Ms.
Holly E. Mabb, Town Clerk, Town of Kingsbury, re:
Resolution opposing dredge-and-landfill project,
June 6, 19 97; (2) Resolution in Opposition to
the Establishment Within the Town of Fort Edward
of a PCB Landfill Necessitated by a Hudson River
Dredging Project, prepared by Kingsbury Town
Board, June 6, 1997); (3) Letter to Mr. Terry B.
Gould, Supervisor, Town of Kingsbury, from Mr.
Stuart A. Buchanan, Regional Director - Region 5,
New York State Department of Environmental
Conservation, re: Resolution opposing dredging
project, June 20, 1997.)

134


-------
P. 10.5453 - Letter to Mr. Peter J. Telisky, Supervisor, Town
10.5461 of Whitehall, from Ms. Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, re: Town of
Whitehall resolution opposing dredging, July 16,
1997. (Attachments: (1) Letter to Honorable
Carol Browner, Administrator, U.S. EPA, from Mr.
Peter J. Telisky, Supervisor, Town of Whitehall,
re: Resolution opposing dredge-and-landfill
project, June 13, 1997; (2) Resolution No. 27,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Whitehall, June 5, 1997); (3)
Letter to Mr. Peter J. Telisky, Supervisor, Town
of Whitehall, from Mr. Wiley W. Lavigne, P.E.,
Regional Engineer, New York State Department of
Environmental Conservation, re: Resolution, June
25, 1997.)

P. 10.5462 - Letter to Ms. Patricia Perkins, Village Clerk,
10.5467 Village of Greenwich, from Ms. Jeanne M. Fox,

Regional Administrator, U.S. EPA, Region II, re:
Village of Greenwich resolution opposing
dredging, July 16, 1997. (Attachments: (1)
Resolution Opposing Dredging of the Upper Hudson
River and Creation of a Toxic Waste Landfill,
prepared by Village of Greenwich Board, June 13,
1997; (2) Letter to Christopher McCormick, Mayor,
Village of Greenwich, from Mr. Wiley W. Lavigne,
P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:
Resolution, June 24, 1997.)

P. 10.5468 - Letter to Mr. Thomas Walsh, Supervisor, Town of
10.5472 Brunswick, from Ms. Jeanne M. Fox, Regional

Administrator, U.S. EPA, Region II, re: Town of
Whitehall resolution opposing dredging, July 16,
1997. (Attachment: Resolution No. 58, 1997,
Resolution Opposing Dredging of the Upper Hudson
River and Creation of a Toxic Waste Landfill,
prepared by Town Board of the Town of Brunswick,
June 12, 1997.)

P. 10.5473 - Letter to Town Clerk, Village of Victory, from
10.5479 Ms. Jeanne M. Fox, Regional Administrator, U.S.

EPA, Region II, re: Village of Victory resolution
opposing dredging, July 16, 1997. (Attachments:
(1) Resolution No. 3, Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste

135


-------
Landfill, prepared by Village of Victory, June
12, 1997; (2) Letter to Ms. Patricia Jolie-
Zotzmann, Mayor, Village of Victory Mills, from
Mr. Wiley W. Lavigne, P.E., Regional Engineer,
New York State Department of Environmental
Conservation, re: Resolution, June 24, 1997.)

P. 10.5480 - Letter to Ms. Pauline D. Levo, Town Clerk, Town
10.5485 of Greenfield, from Ms. Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, re: Town of
Greenfield resolution opposing dredging, July 16,
1997. (Attachments: (1) Resolution No. 91,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Greenfield, June 12, 1997;
(2) Letter to Mr. Robert A. Stokes, Supervisor,
Town of Greenfield, from Mr. Wiley W. Lavigne,
P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:
Resolution, July 1, 1997.)

Letter to Mr. William J. Mevec, Town Clerk, Town
of Milton, from Ms. Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, re: Town of
Milton resolution opposing dredging, July 16,
1997. (Attachments: (1) Resolution #34, Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by Town
Board, Town of Milton, June 12, 1997; (2) Letter
to Mr. Wilbur J. Trieble, Supervisor, Town of
Milton, from Mr. Wiley W. Lavigne, P.E., Regional
Engineer, New York State Department of
Environmental Conservation, re: Resolution, July
1, 1997.)

Letter to Ms. Diana Eggleston, Town Clerk, Town
of Argyle, from Ms. Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, re: Town of
Argyle resolution opposing dredging, July 16,
1997. (Attachments: (1) Letter from Ms. Diana
Eggleston, Town Clerk, Town of Argyle, re:
Resolution opposing dredge-and-landfill project,
June 13, 19 97; (2) Resolution 39-97, Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by Town
Board, Town of Argyle, June 13, 1997; (3) Letter
to Mr. Glenn R. Jones, Supervisor, Town of
Argyle, from Mr. Wiley W. Lavigne, P.E., Regional

P,

10.5486
10.5492

P.

10.5493
10.5499

136


-------
Engineer, New York State Department of
Environmental Conservation, re: Resolution, June
25, 1997.)

P. 10.5500 - Letter to Mr. Michael P. Glavin, Supervisor, Town
10.5506 of Schodack, from Ms. Jeanne M. Fox, Regional

Administrator, U.S. EPA, Region II, re: Town of
Schodack resolution opposing dredging, July 16,
1997. (Attachments: (1) Letter to Honorable
Carol Browner, Administrator, U.S. EPA, from Mr.
Michael P. Glavin, Supervisor, Town of Schodack,
re: Resolution opposing dredge-and-landfill
project, June 16, 1997; (2) Town Board
Resolution-97-158,06/12/97-Town of Fort
Edward/Dredging, prepared by Town Board, Town of
Schodack, June 12, 1997.)

P. 10.5507 - Letter to Honorable Robert M. Blais, Mayor,

10.5513 Village of Lake George, from Ms. Jeanne M. Fox,
Regional Administrator, U.S. EPA, Region II, re:
Village of Lake George resolution opposing
dredging, July 16, 1997. (Attachments: (1)

Letter to Honorable Carol Browner, Administrator,
U.S. EPA, from Honorable Robert M. Blais, Mayor,
Village of Lake George, re: Resolution opposing
dredge-and-landfill project, June 17, 1997; (2)
Resolution No. 24, 1997, Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste
Landfill), prepared by Board of Trustees, Village
of Lake George, June 12, 1997); (3) Letter to
Honorable Robert M. Blais, Mayor, Village of Lake
George, from Mr. Wiley W. Lavigne, P.E., Regional
Engineer, New York State Department of
Environmental Conservation, re: Resolution, June
25, 1997.)

P. 10.5514 - Letter to Honorable Robert E. Phinney, Mayor,
10.5520 Village of South Glens Falls, from Mr. Richard
L. Caspe, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Village of
South Glens Falls resolution opposing
dredging, September 3, 1997. (Attachments: (1)
Resolution Opposing Dredging of the Upper
Hudson River and Creation of a Toxic Waste
Landfill, prepared by South Glens Falls
Village Board, June 4, 1997); (2) Letter to
Honorable Robert E. Phinney, Mayor, Village of
South Glens Falls, from Mr. Wiley W. Lavigne,

137


-------
P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:
Resolution, June 24, 1997.)

P. 10.5521 - Letter to Ms. Shirley M. Lamb, Town Clerk, Town
10.5528 of Easton, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Easton resolution
opposing dredging, September 3, 1997.

(Attachments: (1) Letter to Honorable Carol
Browner, Administrator, U.S. EPA, from Ms.

Shirley M. Lamb, Town Clerk, Town of Easton, re:
Resolution opposing dredge-and-landfill project,
June 3, 19 97; (2) Resolution No. 72-97, Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by Town
Board, Town of Easton, June 3, 1997); (3) Letter
to Mr. R. Harry Booth, Supervisor, Town of
Easton, from Mr. Wiley W. Lavigne, P.E., Regional
Engineer, New York State Department of
Environmental Conservation, re: Resolution, June
24, 1997.)

P. 10.5529 - Letter to Mr. Fred Champagne, Town Supervisor,
10.5538 Town of Queensbury, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Town of
Queensbury resolution opposing dredging,

September 3, 1997. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Mr. Fred Champagne, Town Supervisor, Town of
Queensbury, re: Resolution opposing dredge-and-
landf ill project, June 3, 19 97; (2) Resolution
No. 234, 1997, prepared by Town Board, Town of
Queensbury, June 2, 1997); (3) Letter to Mr. Fred
Champagne, Town Supervisor, Town of Queensbury,
from Mr. Wiley W. Lavigne, P.E., Regional
Engineer, New York State Department of
Environmental Conservation, re: Resolution, June
23, 1997.)

P. 10.5539 - Letter to Ms. Mary Jane Godfrey, Town Clerk, Town
10.5545 of Fort Ann, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Fort Ann resolution
opposing dredging, September 3, 1997.

(Attachments: (1) Memorandum to Honorable Carol
Browner, Administrator, U.S. EPA, from Ms. Mary

138


-------
Jane Godfrey, Town Clerk, Town of Fort Ann, re:
Resolution opposing dredge-and-landfill project,
June 11, 19 97; (2) Resolution No. 33, 1997,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Fort Ann, June 11, 1997); (3)
Letter to Mr. John Aspland, Supervisor, Town of
Fort Ann, from Mr. Wiley W. Lavigne, P.E.,
Regional Engineer, New York State Department of
Environmental Conservation, re: Resolution, June
24, 1997.)

P. 10.5546 - Letter to Ms. Barbara Murphy, Deputy Town Clerk,
10.5551 Town of White Creek, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Town of White
Creek resolution opposing dredging, September 3,
1997. (Attachments: (1) Resolution No. 9,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town of White Creek Board, June 10, 1997); (2)
Letter to Donald E. Cummings, Supervisor, Town of
White Creek, from Mr. Wiley W. Lavigne, P.E.,
Regional Engineer, New York State Department of
Environmental Conservation, re: Resolution, June
24, 1997.)

P. 10.5552 - Letter to Mr. Wesley A. Clark, Village Clerk,
10.5557 Village of Argyle, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Village of
Argyle resolution opposing dredging, September 3,
1997. (Attachments: (1) Resolution No. 1,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Village of Argyle, June 9, 1997); (2) Letter to
James S. Dier, Mayor, Village of Argyle, from Mr.
Wiley W. Lavigne, P.E., Regional Engineer, New
York State Department of Environmental
Conservation, re: Resolution, July 17, 1997.)

P. 10.5558 - Letter to Mr. Willard Aubrey, Supervisor, Town of
10.5562 Hartford, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Hartford resolution
opposing dredging, September 3, 1997.

(Attachment: Resolution No. 970099, Opposing
Dredging of the Upper Hudson River and Creation

139


-------
of a Toxic Waste Landfill, prepared by Town Board
of Hartford, June 9, 1997.)

P. 10.5563 - Letter to Honorable Brian Brooks, Mayor, Village
10.5568 of Whitehall, from Mr. Richard L. Caspe,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Village of
Whitehall resolution opposing dredging, September
3, 1997. (Attachments: (1) Resolution Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by Board of
Trustees, Village of Whitehall, June 16, 1997);
(2) Letter to Honorable Brian Brooks, Mayor,
Village of Whitehall, from Mr. Wiley W. Lavigne,
P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:
Resolution, June 24, 1997.)

P. 10.5569 - Letter to Ms. Elaine A. Kelly, Town Clerk, Town
10.5575 Of Greenwich, from Mr. Richard L. Caspe,

Director, U.S. EPA, Region II, re: Town of
Greenwich resolution opposing dredging, September
3, 1997. (Attachments: (1) Letter to Ms. Merrilyn
Pulver, Councilwoman, Town of Fort Edward, from
Ms. Elaine A. Kelly, Town Clerk, Town of
Greenwich, re: Resolution opposing dredge-and-
landfill project, June 13, 19 97; (2) Resolution
No. 97, Opposing Dredging of the Upper Hudson
River and Creation of a Toxic Waste Landfill,
prepared by Town Board, Town of Greenwich, June
3, 1997); (3) Letter to Mr. Roland R. Mann,
Supervisor, Town of Greenwich, from Mr. Wiley W.
Lavigne, P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:
Resolution, June 25, 1997.)

P. 10.5576 - Letter to Ms. Anne M. Maxon, Town Clerk, Town of
10.5580 Berlin, from Mr. Richard L. Caspe, Director,

Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Berlin resolution
opposing dredging, September 3, 1997.

(Attachment: Resolution No. 97-4, Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by Town Board
of Berlin, July 21, 1997.)

P. 10.5581 - Letter to Honorable Thomas J. Higgins, Mayor,
10.5590 City of Mechanicville, from Mr. Richard L.

140


-------
Caspe, Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re: Town
of Mechanicville resolution opposing dredging,
September 3, 1997. (Attachments: (1) Letter to
Honorable Thomas J. Higgins, Mayor, City of
Mechanicville, from Mr. John P. Cahill,
Commissioner, New York State Department of
Environmental Conservation, re: Resolution
opposing dredge-and-landfill project, August 11,
1997; (2) Letter to Mr. John P. Cahill,
Commissioner, New York State Department of
Environmental Conservation, from Honorable
Thomas J. Higgins, Mayor, City of Mechanicville,
re: Copy of resolution, July 17, 1997; (3)
Resolution No. 74-97, Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste
Landfill, prepared by City of Mechanicville,

July 16, 1997; (4) Letter to Ms. Carol Browner,
Administrator, U.S. EPA, from Honorable Thomas
J. Higgins, Mayor, City of Mechanicville, re:

Copy of resolution No. 74-97, July 17, 1997; (5)
Resolution No. 74-97, Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste
Landfill, prepared by City of Mechanicville,

July 16, 1997, (6) Letter to Ms. Jeanne M. Fox,
Regional Administrator, U.S. EPA, Region II,
from Honorable Thomas J. Higgins, Mayor, City of
Mechanicville, re: Copy of resolution No. 74-97,
July 17, 1997; (7) Resolution No. 74-97,

Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
City of Mechanicville, July 16, 1997.)

P. 10.5591 - Letter to Ms. Kathleen Marchione, Clerk of the
10.5597 Board of Supervisors, County of Saratoga, from
Mr. Richard L. Caspe, Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: Saratoga County Board of Supervisors
resolution opposing dredging, September 3, 1997.
(Attachments: (1) Resolution 93-97, Opposing
Proposed PCB Dredging in the Hudson River,
prepared by Saratoga County Board of Supervisors,
July 15, 1997; (2) Letter to Mr. Richard E.

Weber, Chairman, Saratoga County Board of
Supervisors, from Mr. Wiley W. Lavigne, P.E.,
Regional Engineer, New York State Department of
Environmental Conservation, re: Resolution No.
93-97, July 29, 1997; (3) Letter to Mr. Marvin R.

141


-------
LeRoy, Chairman, Saratoga County Board of
Supervisors, from Mr. Wiley W. Lavigne, P.E.,
Regional Engineer, New York State Department of
Environmental Conservation, re: Resolution 132-
97, November 6, 1997.)

P. 10.5598 - Letter to Ms. Jean D. Casey, Town Clerk, Town of
10.5602 Saratoga, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Saratoga resolution
opposing dredging, September 3, 1997.

(Attachments: (1) Letter to Mr. Robert F. Hall,
Supervisor, Town of Saratoga, from Mr. Wiley W.
Lavigne, P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:
Resolution, August 7, 1997; (2) Resolution in
Opposition to the Dredging of the Hudson River,
prepared by Saratoga Town Board, July 14, 1997.)

P. 10.5603 - Letter to Ms. Muriel K. Swatling, Town Clerk,
10.5609 Town of Ballston, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Town of
Ballston resolution opposing dredging, September
3, 1997. (Attachments: (1) Letter to Honorable
Carol Browner, Administrator, U.S. EPA, from Ms.
Muriel K. Swatling, Town Clerk, Town of Ballston,
re: Copy of resolution, June 24, 1997; (2)
Resolution: 97-47, prepared by Town Board, Town
of Ballston, June 24, 1997; (3) Letter to Ms.
Muriel K. Swatling, Town Clerk, Town of Ballston
Spa, from Mr. Wiley W. Lavigne, P.E., Regional
Engineer, New York State Department of
Environmental Conservation, re: Resolution 97-47,
July 11, 1997.)

p. 10.5610 - Letter to Honorable Kim Gamache, Mayor, Village
10.5616 of Schuylerville, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution by
the Village of Schuylerville in which the Village
expresses its opposition to any remediation
measures that involve the dredging of PCB-
contaminated sediments from the Hudson River and
the disposal of those sediments in a landfill,
September 3, 1997. (Attachments: (1) Resolution
No. 1, prepared by the Village Board of the
Village of Schuylerville, June 23, 1997; (2)

142


-------
Letter to Mayor Kim Gamache, Village of
Schuylerville, from Mr. Wiley W. Lavigne, P.E.,
Regional Engineer, New York State Department of
Environmental Conservation, re: Resolution No. 1,
July 1, 1997.)

P. 10.5617 - Letter to Ms. Frances Sloan, Town Clerk, Town of
10.5624 Hebron, from Mr. Richard L. Caspe, Director,

Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Hebron resolution
opposing dredging, September 3, 1997.

(Attachments: (1) Letter to Honorable Jeanne M.
Fox, Regional Administrator, U.S. EPA, Region II,
from Ms. Frances Sloan, Town Clerk, Town of
Hebron, re: Copy of resolution, August 14, 1997;
(2) Memorandum to Hudson River Town and Village
Officials, from Ms. Merrilyn Pulver,

Councilwoman, Town of Fort Edward, re: Resolution
in Opposition to a PCB Dredge-and-Landfill
Project, July 17, 1997; (3) Resolution No. 41,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Hebron; (4) Letter to Mr.

Arch R. Craig, Supervisor, Town of Hebron, from
Mr. Wiley W. Lavigne, P.E., Regional Engineer,
New York State Department of Environmental
Conservation, re: Resolution No. 41, August 28,
1997.)

P. 10.5625 - Letter to Mr. Bruce A. Ferguson, Chairman,

10.5629 Agricultural & Farmland Protection Board,

Washington County Board of Supervisors, from Mr.
John S. Frisco for Mr. Richard L. Caspe,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Letters
opposing dredging, September 5, 1997.

(Attachments: (1) Letter to Honorable Carol
Browner, Administrator, U.S. EPA, from Mr. Bruce
A. Ferguson, Chairman, Agricultural & Farmland
Protection Board, Washington County Board of
Supervisors, re: Opposition to PCB dredging and
landfill project, July 23, 1997; (2) Letter to
Mr. Bruce A. Ferguson, Chairman, Agricultural &
Farmland Protection Board, Washington County
Board of Supervisors, from Mr. Wiley W. Lavigne,
P.E., Regional Engineer, New York State
Department of Environmental Conservation, re:

143


-------
Opposition to PCB dredging and landfill project,
August 4, 1997.)

P. 10.5630 - Letter to Mr. Richard L. Caspe, Director,

10.5640 Emergency and Remedial Response Division, U.S.
EPA, Region II, from Ms. Merrilyn Pulver,
Councilwoman, Town of Fort Edward, re: Opposition
to Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, September 29,
1997. (Attachments: (1) News Clipping: EPA Admits
Secret Search for PCB Dumps, prepared by Mr.

David Blow, Staff Writer, September 26, 1997; (2)
News Clipping: EPA Secretly Looks for PCB Dump:
Critics, prepared by Mr. Lee Coleman, Gazette
Reporter, September 26, 1997; (3) News Clipping:
Upper Hudson River may be Site of PCB Dump,
Solomon Savs, prepared by Mr. Paul Post, The
Saratogian, September 26, 1997; (4) News
Clipping: EPA Savs 50 Sites Identified for PCB
Dumps, prepared by Mr. David Blow, Staff Writer,
September 27, 1997; (5) News Clipping: EPA: PCB
Dump Study Secrecy a Mistake, prepared by Mr. Lee
Coleman, Gazette Reporter, September 27, 1997;
(6) News Clipping: EPA Admits Mistake in Hiding
Study, prepared by Mr. Paul Post, The Saratogian,
September 27, 1997; (7) News Clipping:

Editorials, EPA Untrustworthy in Secret Search
for Dump, September 28, 1997.)

P. 10.5641 - List: Town/Villaqe/Countv Boards Opposing Hudson
10.5728 River PCB Dredging and Landfillinq, September 29,
1997. (Attachments: (1) Letter from Ms. Diana
Eggleston, Town Clerk, Town of Argyle, re:
Resolution 39-97, June 13, 1997; (2) Resolution
39-97, Opposing Dredging of the Upper Hudson
River and Creation of a Toxic Waste Landfill,
prepared by Town Board, Town of Argyle, June 13,
1997; (3) Letter to Ms. Merrilyn Pulver,
Councilwoman, Town of Fort Edward, from Ms.

Muriel K. Swatling, Town Clerk, Town of Ballston,
re: Copy of Resolution, No. 97-47, June 24, 1997;
(4) Resolution: 97-47, prepared by Town Board,
Town of Ballston, June 3, 1997; (5) Letter to Ms.
Merrilyn Pulver, Councilwoman, Town of Fort
Edward, from Mr. Marvin R. LeRoy, Jr., Town
Supervisor, Town of Clifton Park, re: Resolution
opposing a Hudson River dredging and landfill
project, June 26, 1997; (6) Resolution No. 79,

144


-------
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Clifton Park, July 3, 1997;
(7) Letter to Ms. Merrilyn Pulver, Councilwoman,
Town of Fort Edward, from Ms. Mary Ann Johnson,
Supervisor, Town of Day, re: Resolution opposing
a Hudson River dredging and landfill project,

July 23, 1997; (8) Resolution No. 72-97, Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by Town
Board, Town of Easton, June 3, 1997; (9)
Memorandum to Ms. Merrilyn Pulver, Councilwoman,
Town of Fort Edward, from Ms. Mary Jane Godfrey,
Town Clerk, Town of Fort Ann and Mr. John
Aspland, Supervisor, re: Opposing Dredging of
Upper Hudson River, June 11, 1997; (10)

Resolution No. 33, 1997, Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste
Landfill, prepared by Town Board, Town of Fort
Ann, June 11, 1997; (11) Resolution: Town Board
Resolution-97-158, 06/12/97-Town of Fort
Edward/Dredging, prepared by Town Board, Town of
Schodack, June 12, 1997; (12) Resolution: Town of
Fort Edward, prepared by Town Board of Town of
Fort Edward, May 12, 1997; (13) Resolution No.
91, Opposing Dredging of the Upper Hudson River
and Creation of a Toxic Waste Landfill, prepared
by Town Board, Town of Greenfield, June 12, 1997;
(14) Letter to Ms. Merrilyn Pulver, Councilwoman,
Town of Fort Edward, from Ms. Elaine A. Kelly,
Town Clerk, Town of Greenwich, re: Resolution
opposing dredge and landfill project, June 13,
19 97; (15) Resolution No. 97, Opposing Dredging
of the Upper Hudson River and Creation of a Toxic
Waste Landfill, prepared by Town Board, Town of
Greenwich, June 10, 1997; (16) Resolution No. 1,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Village of Argyle, June 9, 1997; (17)
Resolution #15 of 1997, prepared by Town Board,
Town of Hampton, May 21, 1997; (18) Letter to Ms.
Merrilyn Pulver, Councilwoman, Town of Fort
Edward, from Ms. Holly E. Mabb, Town Clerk, Town
of Kingsbury, re: Resolution opposing dredge and
landfill project, June 6, 1997; (19) Resolution
in Opposition to the Establishment within the
Town of Fort Edward of A PCB Landfill
Necessitated by a Hudson River Dredging Project,

145


-------
prepared by Town Board, Town of Kingsbury, June
6, 19 97; (20) Resolution #34, Opposing Dredging
of the Upper Hudson River and Creation of a Toxic
Waste Landfill, prepared by Town Board, Town of
Milton, June 12, 1997; (21) Letter to Ms.

Merrilyn Pulver, Councilwoman, Town of Fort
Edward, from Ms. Mary Kilpatrick, Town Clerk,

Town of Salem, re: Resolution opposing dredge and
landfill project, June 18, 1997; (22) Resolution
No. 31, Opposing Dredging of the Upper Hudson
River and Creation of a Toxic Waste Landfill,
prepared by Town Board, Town of Salem, June 11,
19 97; (23) Resolution No. 58, 1997, Resolution
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board of the Town of Brunswick, June 12,
1997, incomplete; (24) Resolution in Opposition
to the Dredging of the Hudson River, prepared by
Saratoga Town Board, July 14, 1997; (25) Letter
(w/attachments) to Honorable Merrilyn Pulver,
Councilwoman, Town of Fort Edward, from Mr.
Michael P. Glavin, Supervisor, Town of Schodack,
re: Hudson River PCB Dredging Project, June 16,
1997; (26) Letter to Honorable Merrilyn Pulver,
Councilwoman, Town of Fort Edward, from Mr. Paul
F. Lilac, Supervisor, Town of Stillwater, re:
Resolution opposing dredge-and-landfill project,
June 12, 1997; (27) Resolution: Opposing Dredging
of the Upper Hudson River and Creation of a Toxic
Waste Landfill, prepared by Town Board, Town of
Stillwater, June 5, 1997; (28) Letter to Ms.
Merrilyn Pulver, Councilwoman, Town of Fort
Edward, from Mr. Robert A. Stokes, Supervisor,
Saratoga County, re: Resolution opposing dredge-
and-landf ill proj ect, June 13, 1997; (29)
Resolution No. 9, Opposing Dredging of the Upper
Hudson River and Creation of a Toxic Waste
Landfill, prepared by Town Board, Town of White
Creek, undated; (30) Letter to Ms. Merrilyn
Pulver, Councilwoman, Town of Fort Edward, from
Mr. Peter J. Telisky, Supervisor, Town of
Whitehall, re: Resolution opposing dredge-and-
landf ill proj ect, June 13, 1997; (31) Resolution
No. 27, Opposing Dredging of the Upper Hudson
River and Creation of a Toxic Waste Landfill,
prepared by Town Board, Town of Whitehall, June
5, 1997; (32) Letter to Ms. Merrilyn Pulver,
Councilwoman, Town of Fort Edward, from Mr.

146


-------
Thomas J. Higgins, Mayor, City of Mechanicville,
re: Resolution No. 74-97, July 17, 1996;
Resolution No. 74-97, Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste
Landfill, prepared by City of Mechanicville, June
16, 1997; (33) Letter to Ms. Merrilyn Pulver,
Councilwoman, Town of Fort Edward, from Mr. J.
Michael O'Connell, Mayor, City of Saratoga
Springs, re: Proposed resolution, May 22, 1997;
(34) Letter to Ms. Merrilyn Pulver, Councilwoman,
Town of Fort Edward, from Ms. Elizabeth A.

Hudson, Village Clerk, Village of Castleton-on-
Hudson, re: Resolution Supporting Fort Edward,
June 4, 19 97; Resolution No. 10 of 1997,

Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Landfill, prepared by Village
of Castleton-on-Hudson, undated; (35) Letter to
Ms. Merrilyn Pulver, Councilwoman, Town of Fort
Edward, from Mr. Wallace H. Estill, Village
Clerk, Village of Corinth, re: PCB Dredge-and-
Landfill Project, June 9, 19 97; (36) Resolution
Number 4, Village Board, Village of Fort Edward,
July 7, 1997; (37) Resolution: Opposing Dredging
of the Upper Hudson River and Creation of a Toxic
Waste Landfill, prepared by Village of Greenwich
Board, undated; (38) Resolution, prepared by
Village Board, Village of Hudson Falls, June 6,
1997; (39) Letter to Ms. Merrilyn Pulver,
Councilwoman, Town of Fort Edward, from Honorable
Robert M. Blais, Mayor, Village of Lake George,
re: Resolution opposing dredge-and-landfill
project, June 18, 1997; (Attachments: (a) Letter
to Ms. Merrilyn Pulver, Councilwoman, Town of
Fort Edward, from Honorable Robert M. Blais,
Mayor, Village of Lake George, re: Resolution
opposing dredge-and-landfill project, June 17,
1997; (b) Resolution No. 24, 1997, Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill), prepared by Board of
Trustees, Village of Lake George, June 16, 1997;
(40) Letter to Ms. Merrilyn Pulver, Councilwoman,
Town of Fort Edward, from Mr. Fred Champagne,

Town Supervisor, Town of Queensbury, re:
Resolution opposing dredge-and-landfill project,
June 3, 1997; (Attachment: Resolution Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by Town
Board, Town of Queensbury, June 2, 1997); (41)

147


-------
Resolution No. 1, prepared by Village of
Schuylerville, undated; (42) Resolution: Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, prepared by South
Glens Falls Village Board, June 4, 1997; (43)
Letter to Ms. Merrilyn Pulver, Councilwoman, Town
of Fort Edward, from Mr. Ernest W. Martin, Mayor,
Village of Stillwater, re: Resolution opposing
dredge-and-landfill project, June 25, 1997; (44)
Resolution Opposing Dredging of the Upper Hudson
River and Creation of a Toxic Waste Landfill,
prepared by Village Board, Village of Whitehall,
undated; (45) Letter to Friends, Village of
Victory, from Mr. Ronald Stafford, New York State
Senate, re: Resolution #3, June 18, 1997;
(Attachments: (a) Letter to Town Board, Village
of Victory, from Mr. Robert A. D'Andrea, New York
State Assembly, re: Resolution #3, June 16, 1997,
(b) Letter to Ms. Merrilyn Pulver, Councilwoman,
Town of Fort Edward, from Ms. Jean E. Nolan,
Clerk/Treasurer, Village of Victory, re:
Resolution #3, June 12, 1997, (c) Resolution No.
3, Opposing Dredging of the Upper Hudson River
and Creation of a Toxic Waste Landfill, prepared
by Village of Victory, undated.)

P. 10.5729 - Resolution No. 132-97, Opposing Proposed PCB

	10.5730 Dredging in Hudson River, prepared by Saratoga

County Board of Supervisors October 21, 1997.

P. 10.5731 - Letter to Ms. Mary J. Pearson, Town Clerk, Town

10.5738 of Halfmoon, from Mr. Richard L. Caspe, Director,
U.S. EPA, Region II, re: Town of Halfmoon
resolution opposing dredging, October 27, 1997,
(Attachments: (1) Memorandum from Town Board,

Town of Halfmoon, re: Resolution Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, August 25, 1997.
(Attachment: Resolution, prepared by Town Board,
Town of Halfmoon, August 21, 1997); (2) Letter to
Mr. Lawrence W. DeVoe, Supervisor, Town of
Halfmoon, from Mr. Wiley W. Lavigne, P.E.,
Regional Engineer, New York State Department of
Environmental Conservation, re: Resolution,
September 5, 1997.)

148


-------
p. 10.5739 - Notice from Town of Easton, Ms. Shirley M. Lamb,
10.5740 Town Clerk, re: Resolution #138-97, October 28,
1997. (Attachment: Resolution #. 138 - 97, To
Support a County Law to Prohibit a PCB Landfill
within Washington County, prepared by Town Board,
Town of Easton, October 28, 1997.)

P. 10.5741 - Letter to Ms. Joan Parsons, Secretary,

10.5745 Intercounty Legislative Committee of the

Adirondacks, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing the
Hudson River dredging and landfill project,
November 25, 1997, (Attachment: Resolution No.

	12 of 1997, Resolution Opposing Proposed PCB

Dredging in Hudson River, prepared by Intercounty
Legislative Committee of the Adirondacks, October
16, 1997.)

P. 10.5746 - Letter to Ms. Christine M. Chesley, Clerk,

10.5748 Rensselaer County Legislature, from Mr. Richard
L. Caspe, Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re:
Resolution opposing the Hudson River dredging and
landfill project, November 26, 1997.

(Attachment: Resolution No. P/475/97, Resolution
Opposing the Siting of a Hazardous Waste Landfill
in any Town, City or Village in Rensselaer
County, prepared by Rensselaer County
Legislature, October 6, 1997.)

P. 10.5749 - Letter to Mr. Harold E. Robillard, Clerk, Warren
10.5753 County Board of Supervisors, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Opposition to
Hudson River dredging and landfill project,
undated. (Attachment: Resolution No. 457 of
1997, Opposing Proposed PCB Dredging in Hudson
River, prepared by Warren County Board of
Supervisors October 17, 1997.)

P. 10.5754 - Letter to Ms. Diana Eggleston, Town Clerk, Town

10.5756 of Argyle, from Mr. John P. Cahill, Commissioner,
New York State Department of Environmental
Conservation, re: Town of Argyle resolution 43-
97, undated. (Attachment: Resolution 43-97, To
Support a County Law to Prohibit a PCB Landfill

149


-------
Within Washington County, prepared by Town Board,
Town of Argyle, December 15, 1997.)

P. 10.5757 - Letter to Mr. William McCabe, Deputy Director,
10.5760 Emergency and Remedial Response Division, U.S.

EPA, Region II, from Mr. Peter Balet, Chairman,
Saratoga County Environmental Management Council,
re: Dissemination of information regarding the
Hudson River PCBs Superfund Reassessment, January
13, 1998.

P. 10.5761 - Letter to Mr. Joseph C. Mancuso, Mayor, Village
10.5763 of Monroe, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division,
U.S. EPA, Region II, re: Resolution supporting
Hudson River PCBs Site Reassessment, February 5,
1998. (Attachments: (1) Letter to Honorable
Carol Browner, Administrator, U.S. EPA, from Mr.
Joseph C. Mancuso, Mayor, Village of Monroe, re:
Resolution to urge the EPA to reassess Hudson
River PCBs and evaluate potential remedial
actions, January 8, 1998; (2) Resolution: EPA's
Reassessment of PCBs in the Hudson River and the
Evaluation of Potential Remedial Actions,
prepared by Village of Monroe, January 6,
1998.)

P. 10.5764 - Letter to Ms. Patricia Dwyer, Village Manager,

10.5766 Village/Town of Mount Kisco, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
February 5, 1998. (Attachments: (1) Letter to
Ms. Carol Browner, Administrator, U.S. EPA, from
Ms. Patricia Dwyer, Village Manager, Village/Town
of Mount Kisco, re: Resolution to urge the EPA to
reassess Hudson River PCBs and evaluate potential
remedial actions, January 1998; (2) Resolution in
Support of EPA's Reassessment of PCBs in the
Hudson River and the Evaluation of Potential
Remedial Actions, prepared by Village of Mount
Kisco, January 5, 1998.)

P. 10.5767 - Letter to Ms. Dolores M. Stankey, Town Clerk,

10.5769 Town of North Salem, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,

150


-------
February 5, 1998. (Attachment: Resolution in
Support of EPA's Reassessment of PCBs in the
Hudson River and the Evaluation of Potential
Remedial Actions, prepared by Town of North
Salem, January 5, 1998.)

P. 10.5770 - Letter to Mr. Sean Treacy, Mayor, Village of
10.5774 Sleepy Hollow, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
February 5, 1998. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Mr. Sean Treacy, Mayor, Village of Sleepy
Hollow, re: Resolution supporting the Hudson
River reassessment, January 12, 1998; (2)
Resolution # 01-08-98, prepared by Village of
Sleepy Hollow Board of Trustees, January 6,

1998 . )

P. 10.5775 - Letter to Mr. Matthew P. Carey, Village Clerk,
10.5778 Village of Dobbs Ferry, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
February 5, 1998. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Mr. Matthew P. Carey, Village Clerk, Village
of Dobbs Ferry, re: Resolution to Urge the EPA to
Reassess Hudson River PCBs and Evaluate Potential
Remedial Actions, January 12, 1998; (2)

Resolution in support of U.S. EPA's reassessment
of PCBs in the Hudson River, prepared by Village
of Dobbs Ferry Board of Trustees, January 6,
1998 . )

P. 10.5779 - Letter to Mr. Richard A. Falanka, Acting Village
10.5782 Manager, Village of Port Chester, from Mr.

Richard L. Caspe, Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: Resolution supporting Hudson River PCBs site
reassessment, February 5, 1998. (Attachments:
(1) Letter to Honorable Carol Browner,
Administrator, U.S. EPA, from Mr. Richard A.
Falanka, Acting Manager, Village of Port Chester,
re: Resolution supporting the Hudson River
reassessment, December 31, 1997; (2) Resolution,

151


-------
prepared by Village of Port Chester Board of
Trustees, December 30, 1997.)

P. 10.5783 - Letter to Ms. Elizabeth Hudson, Village Clerk,
10.5785 Village of Castleton-On-Hudson, from Mr Richard
L. Caspe, Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re:
Resolution supporting Hudson River PCBs site
reassessment, February 5, 1998. (Attachments:
Letter to Honorable Carol Browner, Administrator,
U.S. EPA, from Ms. Elizabeth Hudson, Village
Clerk, Village of Castleton-On-Hudson, re:
Resolution to Urge the EPA to Reassess Hudson
River PCBs, December 30, 1997; (2) Resolution

Thirty One (31) of 1997, Supporting EPA's
Reassessment of PCBs in the Hudson River and the
Evaluation of Potential Remedial Actions,
prepared by Village of Castleton-On-Hudson Board
of Trustees, December 22, 1997.)

P. 10.5786 - Letter to Ms. Holly E. Mabb, Town Clerk, Town of
10.5789 Kingsbury, from Mr. John P. Cahill, Commissioner,
New York State Department of Environmental
Conservation, re: Resolution supporting a county
law prohibiting a PCB landfill in Washington
County, February 6, 1998. (Attachments: (1)
Letter to Honorable Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, from Ms.

Holly E. Mabb, Town Clerk, Town of Kingsbury, re:
Resolution supporting a county law prohibiting a
PCB landfill in Washington County, December 4,
1997; (2) Resolution to Support a County Law to
Prohibit a PCB Landfill within Washington County,
prepared by Town of Kingsbury Board, December 2,
1997.)

P. 10.5790 - Letter to Mr. Alfred A. Gatta, Village Manager,
10.5792 Village of Scarsdale, from Mr Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
February 24, 1998. (Attachments: Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Mr. Alfred A. Gatta, Village Manager,

Village of Scarsdale, re: Resolution supporting
the EPA's reassessment of Hudson River PCBs,
January 20, 1998; (2) Resolution Re: Support of
the EPA's Reassessment of PCBs in the Hudson

152


-------
River and the Evaluation of Potential Remedial
Actions, prepared by Village of Scarsdale Board
of Trustees, January 13, 1998.)

P. 10.5793 - Resolution prepared by Village of Whitehall, re:
10.57 93 Opposition to Hudson River dredging and landfill
project, March 5, 1998.

P. 10.5794 - Letter to Ms. Kathleen Eagen, City Chamberlain,
10.5797 City of Poughkeepsie, from Mr Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
March 13, 1998. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Ms. Kathleen Eagen, City Chamberlain, City
of Poughkeepsie, re: Resolution supporting the
U.S. EPA's reassessment of Hudson River PCBs and
evaluation of potential remedial actions,

February 10, 1998; (2) Resolution in Support of
EPA's Reassessment of PCBs in the Hudson River
and the Evaluation of Potential Remedial Actions,
R98-31, prepared by City of Poughkeepsie,

February 5, 1998.)

P. 10.5798 - Letter to Ms. Suzanne Putnam, Town Clerk, Town of
10.5800 Grafton, from Mr Richard L. Caspe, Director, U.S.

EPA, Region II, re: Resolution supporting Hudson
River PCBs site reassessment, March 13, 1998.
(Attachment: Resolution of the Grafton Town Board
in Support of EPA's Reassessment of PCBs in the
Hudson River and the Evaluation of Potential
Remedial Actions, prepared by Grafton Town Board,
January 12, 1998.)

P. 10.5801 - Letter to Ms. Harriet L. Slater, Village Clerk,
10.5803 Village of Chestnut Ridge, from Mr Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
March 13, 1998. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Ms. Harriet L. Slater, Village Clerk-
Treasurer, Village of Chestnut Ridge, re:
Resolution urging the U.S. EPA's reassessment of
Hudson River PCBs and evaluation of potential
remedial actions, January 29, 1998; (2)

153


-------
Resolution # 98-9, prepared by Village of
Chestnut Ridge, January 15, 1998.)

P. 10.5804 - Letter to Ms. Carole Paffenroth, Village Clerk,
10.5806 Village of Warwick, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
March 13, 1998. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Ms. Carole Paffenroth, Village Clerk,
Village of Warwick, re: Resolution to urge the
EPA to reassess Hudson River PCBs and evaluate
potential remedial actions, January 23, 1998; (2)
Resolution in Support of EPA's Reassessment of
PCBs in the Hudson River and the Evaluation of
Potential Remedial Actions, prepared by Village
of Warwick, January 20, 1998.)

P. 10.5807 - Letter to Ms. Gwendolyn I. Byrd, City Clerk, City
10.5810 of New Rochelle, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
March 13, 1998. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Ms. Gwendolyn I. Byrd, City Clerk, City of
New Rochelle, re: Resolution supporting Hudson
River PCBs site reassessment, January 23, 1998;
(2) Resolution in Support of Environmental
Protection Agency's Reassessment of
Polvchlorinated Biphenvl Contamination in the
Hudson River and the Evaluation of Potential
Remedial Actions, prepared by City of New
Rochelle Council, January 20, 1998.)

P. 10.5811 - Letter to Ms. Linda A. Raneri, Town Clerk, Town
10.5813 of Bedford, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution supporting Hudson
River PCBs site reassessment, March 13, 1998.
(Attachments: (1) Letter to Honorable Carol
Browner, Administrator, U.S. EPA, from Ms. Linda
A. Raneri, Town Clerk, Town of Bedford, re:
Resolution supporting Hudson River PCBs site
reassessment, January 23, 1998; (2) Resolution,
prepared by Town Board of Bedford, January 6,
1998.)

154


-------
P. 10.5814 - Letter to Ms. Jeanne M. Fox, Regional

10.5814 Administrator, U.S. EPA, Region II, from Mr. Paul
J. Feiner, Town Supervisor, Town of Greenburgh,
re: EPA delay in study of Hudson River PCBs
contamination, April 9, 1998.

P. 10.5815 - Letter to Ms. Clara G. Smith, Village Clerk,

10.5816 Village of Ardsley, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
April 15, 1998. (Attachment: Resolution to Urge
the EPA to Reassess Hudson River PCBS and
Evaluate Potential Remedial Actions, January 22,
1998.)

P. 10.5817 - Letter to Mr. Ronald J. Bally, Village Clerk,
10.5820 Village of Goshen, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting Hudson River PCBs site reassessment,
April 15, 1998. (Attachments: (1) Resolution in
Support of EPA's Reassessment of PCBs in the
Hudson River and the Evaluation of Potential
Remedial Actions, January 21, 1998; (2)

Resolution Requesting the Designation of the
Hudson River as an American Heritage River,
undated.)

P. 10.5821 - Letter to Ms. Alice E. Roker, Town Clerk, Town

10.5824 of Yorktown, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution supporting Hudson
River PCBs site reassessment, April 15, 1998.
(Attachments: (1) Letter to Madam/Sir, U.S. EPA,
from Ms. Alice E. Roker, Town Clerk, Town of
Yorktown, re: Town Board Resolution, undated; (2)
Resolution, prepared by Town Board of Yorktown,
January 20, 1998.)

P. 10.5825 - Letter to Ms. Paula Bolant, Village Clerk-

10.5827 Treasurer, Village of Hunter, from Mr. William
McCabe for Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Letter expressing support for
Hudson River PCBs site reassessment, April 16,
1998. (Attachment: Resolution # 43-97
(Resolution in Support of EPA's Reassessment of

155


-------
PCBs in the Hudson River and the Evaluation of
Potential Remedial Actions), January 13, 1998.)

P. 10.5828 - Letter to Honorable C. Michael Cronin, Mayor,
10.5830 Village of Hudson Falls, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing a Hudson River dredging and landfill
project April 24, 1998. (Attachments: (1) Letter
to Honorable Carol Browner, Administrator, U.S.
EPA, from Honorable C. Michael Cronin, Mayor,
Village of Hudson Falls, re: Resolution opposing
a Hudson River dredging and landfill project,
March 4, 1998; (2) Resolution, prepared by
Village of Hudson Falls Board of Trustees, March
3, 1998.)

P. 10.5831 - Letter to Ms. Linda Peterson, Town Clerk, Town of
10.5834 New Castle, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution supporting the
Hudson River PCBs site reassessment, May 12,
1998. (Attachments: (1) Letter to Ms. Carol
Browner, Administrator, U.S. EPA, from Ms. Linda
Peterson, Town Clerk, Town of New Castle, re:
Resolutions supporting the Hudson River PCBs site
reassessment and designation as an American
Heritage River, April 17, 1998; (2) Resolution:
PCB's in Hudson; Designation of Hudson River as
an American Heritage River, prepared by Town
Board, Town of New Castle, February 24, 1998.)

P. 10.5835 - Letter to Mr. Fred J. Mack, Town of Durham,

10.5838	Office of the Supervisor, from Ms. Jeanne M. Fox,
Regional Administrator, U.S. EPA, Region II, re:
Resolution opposing the dredging and landfilling
of the PCB-contaminated sediments from the Hudson
River, May 18, 1998. (Attachment: EPA Hudson
River Project Resolution, prepared by Town Board,
Town of Durham, March 12, 1998.)

P. 10.5839 - Letter to Ms. Pamela Beach, City Clerk, City of

10.5839	Peekskill, from Ms. Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, re:

Resolution in support for the Hudson River PCBs
Site Reassessment, May 28, 1998.

156


-------
P. 10.5840 - Letter to Ms. Patricia O'Donnell, Town Clerk,

10.5842 Town of Clifton Park, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing a Hudson River dredging and landfill
project, June 3, 1998. (Attachment: Resolution
No. 101 of 1998, a Resolution Regarding Dredging
of the Upper Hudson River for Removal of PCB-
Laden Sediments, prepared by Town Board, Town of
Clifton Park, April 20, 1998.)

P. 10.5843 - Letter to Ms. Janet Crawford, Deputy Town Clerk,
10.5844 Town of Germantown, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing a Hudson River dredging and landfill
project, June 15, 1998. (Attachment: Resolution
Pertaining to Dredging of the Hudson River,
prepared by Town Board, Town of Germantown, April
13, 1998.)

P. 10.5845 - Letter to Ms. Mary J. Pearson, Town Clerk, Town

10.5847 of Halfmoon, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing a Hudson
River dredging and landfill project, June 15,
1998. (Attachments: (1) Letter to Ms. Jeanne M.
Fox, Regional Administrator, U.S. EPA, Region II,
from Town Board of Halfmoon, re: Resolution
Opposing the Dredging of the Upper Hudson River,
March 17, 1998; (2) Attachment: Resolution
prepared by Town Board of Halfmoon, March 3,
1998.)

P. 10.5848 - Letter to Ms. Karen L. Graham, Town Clerk, Town
10.5850 of Taghkanic, from Mr. Richard L. Caspe,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing a Hudson River dredging and landfill
project, June 15, 1998. (Attachments: (1) Letter
to Ms. Jeanne M. Fox, Regional Administrator,
U.S. EPA, Region II, from Ms. Karen L. Graham,
Town Clerk, Town of Taghkanic, re: Resolution
opposing a Hudson River dredging and landfill
project, March 8, 1998; (2) Resolution #1 - 1998,
prepared by Town Board of Taghkanic March 2,
1998.)

157


-------
P. 10.5851 - Letter to Ms. Deborah L. Weber, Clerk, Essex

10.5853 County Board of Supervisors, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing a Hudson River dredging and landfill
project, June 15, 1998. (Attachment: No. 68
Resolution in Opposition to the Dredging of the
Hudson River for Removal of PCBs, and Urging the
Environmental Protection Agency to Delay its
		Reassessment of Such Action Until Such a Removal

	Can Be Accomplished Safely and Without Risk to

the People and Property in the Hudson River
Valley, prepared by Essex County Board of
Supervisors, March 2, 1998.)

P. 10.5854 - Letter to Mr. Thomas M. Spence, Supervisor, Town
10.5858 of Hyde Park, from Mr. Richard L. Caspe,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting the Hudson River PCBs site
reassessment, June 15, 1998. (Attachment: (1)
Letter to Honorable Carol Browner, Administrator,
U.S. EPA, from Mr. Thomas M. Spence, Supervisor,
Town of Hyde Park, re: Reassess Hudson River
PCB's, February 26, 1998; (2) Resolution 2:23 - 8
of 1998, In Support of Reassessment of PCB's in
the Hudson River and the Evaluation of Potential
Remedial Actions, prepared by the Town of Hyde
Park, February 23, 1998.)

P. 10.5859 - Letter to Ms. Valerie S. Kilmer, Village Clerk/

10.5861 Treasurer, Village of Rhinebeck, from Mr. William
McCabe, Mr. Richard L. Caspe, Director, Emergency
and Remedial Response Division, U.S. EPA, Region
II, re: Resolution supporting the Hudson River
PCBs site reassessment, June 16, 1998.
(Attachments: (1) Letter to Honorable Carol
Browner, Administrator, U.S. EPA, from Ms.
Valerie S. Kilmer, Village Clerk/ Treasurer,
Village of Rhinebeck, re: Reassess Hudson River
PCB's Resolution, February 10, 1998; (2) Village
Board of Trustees January 13, 1998 Board Meeting,
prepared by Village of Rhinebeck, January 13,
1998.)

P. 10.5862 - Letter to Ms. Susan Steadinger, Town Clerk, Town
10.5865 of Hoosick, from Mr. William McCabe for Mr.

Richard L. Caspe, Director, Emergency and

158


-------
Remedial Response Division, U.S. EPA, Region II,
re: Resolution opposing a Hudson River dredging
and landfill project, June 16, 1998.

(Attachment: Resolution No. 23, 1998, Resolution
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Hoosick, February 9, 1998.)

P. 10.5866 - Letter to Ms. Elma A. Savosky, Village Clerk,
10.5867 Village of Kinderhook, from Mr. William McCabe

for Mr. Richard L. Caspe, Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: Resolution supporting the Hudson River PCBs
site reassessment, June 16, 1998. (Attachment:
Resolution in Support of EPA's Reassessment of
PCB's in the Hudson River and the Evaluation of
Potential Remedial Actions, prepared by Village
of Kinderhook Board of Trustees, January 14,

1998 . )

P. 10.5868 - Letter to Ms. Sara M. Seiler, Village Clerk,

10.5870 Village of South Nyack, from Mr. William McCabe

for Mr. Richard L. Caspe, Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: Resolution supporting the Hudson River PCBs
site reassessment, June 16, 1998. (Attachment:
Extract of Minutes, prepared by Village of South
Nyack Board of Trustees, January 13, 1998.)

P. 10.5871 - Letter to Ms. Susan Maggiotto, Village Clerk,

10.5874 Village of Hastings-on-Hudson, from Mr. William
McCabe for Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution supporting the
Hudson River PCBs site reassessment, June 16,
1998. (Attachments: (1) Letter to Honorable
Carol Browner, Administrator, U.S. EPA, from Ms.
Susan Maggiotto, Village Clerk, Village of
Hastings-on-Hudson, re: Support Resolution - EPA
Reassessment of Hudson River PCBs and Evaluation
of Potential Remedial Actions, February 5, 1998;
(2) Resolution, prepared by Village of Hastings-
on-Hudson, February 3, 1998.)

P. 10.5875 - Letter to Ms. Jo-Ann Dyckmann, Town Clerk, Town
10.5877 of Cortlandt, from Mr. William McCabe for Mr.

Richard L. Caspe, Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,

159


-------
re: Resolution supporting the Hudson River PCBs
site reassessment, June 16, 1998. (Attachment:
(1) Letter to Honorable Carol Browner,
Administrator, U.S. EPA, from Ms. Jo-Ann
Dyckmann, Town Clerk, Town of Cortlandt, re:
Resolution supporting the Hudson River PCBs site
reassessment, February 2, 1998; (2) Resolution
Number 56-98, prepared by Town Board, Town of
Cortlandt, January 13, 1998.)

P. 10.5878 - Letter to Ms. Edna M. Leiser, Town Clerk, Town of
10.5880 Stuyvesant, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing a Hudson
River dredging and landfill project, June 16,
1998. (Attachment: Resolution No. 6, prepared by
Town Board, Town of Stuyvesant, March 12, 1998.)

P. 10.5881 - Letter to Mr. William J. Mevec, Town Clerk, Town
10.5882 of Milton, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing a Hudson
River dredging and landfill project, June 16,
1998. (Attachment: Resolution No. 21-98,
prepared by Town Board, Town of Milton, March 18,
1998.)

P. 10.5883 - Letter to Ms. Mary Ann Johnson, Deputy Town

10.5886 Clerk, Town of Greenfield, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing a Hudson River dredging and landfill
project, June 16, 1998. (Attachments: (1) Letter
to Honorable Carol Browner, Administrator, U.S.
EPA, from Ms. Mary Ann Johnson, Deputy Town
Clerk, Town of Greenfield, re: Resolution
opposing a Hudson River dredging and landfill
project, March 19, 1998; (2) Resolution # 59 -
Opposition to Dredging of Hudson River, prepared
by Town Board, Town of Greenfield, March 12,
1998.)

P. 10.5887 - Letter to Mr. Thorn Kleiner, Supervisor, Town of
10.5890 Orangetown, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution supporting the
Hudson River PCBs site reassessment, June 16,
1998. (Attachment: Letter to Ms. Jeanne M. Fox,

160


-------
Regional Administrator, U.S. EPA, Region II,
from Mr. Thorn Kleiner, Supervisor, Town of
Orangetown, re: Resolution Urging the Completion
of the Hudson River PCBs site reassessment,

March 30, 1998. (Attachment: Resolution No. 37,
Memorializing Resol Hudson River PCBs, prepared
by Town Board of Orangetown, January 28, 1998.)

P. 10.5891 - Letter to Ms. Rose E. Clarkson, Town Clerk, Town
10.5896 of Pawling, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolutions supporting the
Hudson River PCBs site reassessment, June 16,
1998. (Attachments: Letter to Honorable Carol
Browner, Administrator, U.S. EPA, from Ms. Rose
E. Clarkson, Town Clerk, Town of Pawling, re:
Resolutions supporting the Hudson River PCBs site
reassessment and the designation of the Hudson
River as an American Heritage River, January 28,
1998. (Attachments: (a) Resolution in Support of
EPA's Reassessment of PCB's in the Hudson River
and the Evaluation of Potential Remedial Actions,
prepared by Town Board, Town of Pawling, January
13, 1998, (b) Resolution Requesting the
Designation of the Hudson River as an American
Heritage River, prepared by Town Board, Town of
Pawling, January 13, 1998.)

P. 10.5897 - Letter to Mr. Harold E. Robillard, Clerk, Board
10.5900 of Supervisors of Warren County, from Mr.

Richard L. Caspe, Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: Resolution opposing a Hudson River dredging
and landfill project, June 16, 1998, (Attachment:
Resolution No. 297 of 1998 - Opposing any
Dredging and Landfilling of PCBs from the Hudson
River, prepared by Board of Supervisors of
Warren County, April 17, 1998.)

P. 10.5901 - Letter to Ms. Paula Bolant, Village Clerk/

10.5905 Treasurer, Village of Hunter, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing any remediation measure associated with
the Hudson River PCBs Reassessment involving the
dredging and landfilling of hazardous waste, June
16, 1998. (Attachments: (1) Resolution # 52-97
(Resolution in Opposition of EPA's Reassessment

161


-------
of PCBs in the Hudson River and the Evaluation of
Potential Remedial Actions, prepared by Village
of Hunter, April 20, 1998; (2) Resolution # 51-97
(Rescind Resolution # 43-97), prepared by Village
of Hunter, April 20, 1998; (3) Resolution # 43-97
(Resolution in Support of EPA's Reassessment of
PCBs in the Hudson River and the Evaluation of
Potential Remedial Actions), prepared by Village
of Hunter, April 20, 1998; (4) Letter to Ms.

Paula Bolant, Village Clerk/ Treasurer, Village
of Hunter, from Mr. Richard L. Caspe, Director,
U.S. EPA, Region II, re: Resolution supporting
the Hudson River PCBs site reassessment, April
16, 1998.)

P. 10.5906 - Letter to Ms. Ruth Argo Mazzei, Town Clerk, Town
10.5909 of Southeast, from Mr. Richard L. Caspe,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting the Hudson River PCBs site
reassessment, June 16, 1998. (Attachment:
Resolution in Support of EPA's Reassessment of
PCB's in the Hudson River and the Evaluation of
Potential Remedial Actions, prepared by Town of
Southeast, January 22, 1998.)

P. 10.5910 - Letter to Ms. Karen S. Lavinski, Town Clerk, Town
10.5913 of Warwick, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution supporting the
Hudson River PCBs site reassessment, June 25,
1998. (Attachments: (1) Letter to Honorable
Carol Browner, Administrator, U.S. EPA, from Ms.
Karen S. Lavinski, Town Clerk, Town of Warwick,
re: Resolution in Support of EPA's Reassessment
of PCB's in the Hudson River and the Evaluation
of Potential Remedial Actions #R98-65, January
2 6, 1998; (2) Resolution in Support - EPA's
Reassessment of PCBs in the Hudson River and the
Evaluation of Potential Remedial Actions,
prepared by Town Board, Town of Warwick, January
8, 1998.)

P. 10.5914 - Letter to Ms. Susan Ciamarra, Village Clerk,

10.5916 Village of Tuckahoe, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
supporting the Hudson River PCBs site

162


-------
reassessment, July 7, 1998. (Attachment: Village
of Tuckahoe Resolution in Support of EPA's
Reassessment of PCB's in the Hudson River and the
Evaluation of Potential Remedial Actions,
prepared by Village of Tuckahoe, January 12,
1998 . )

P. 10.5917 - Letter to Mr. C. Scott Vanderhoef, County

10.5922 Executive, County of Rockland, from Mr. Richard
L. Caspe, Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re:

Delays to the Hudson River PCBs site
reassessment, July 9, 1998. (Attachments: (1)
Letter to Ms. Carol Browner, Administrator, U.S.
EPA, from Mr. C. Scott Vanderhoef, County
Executive, County of Rockland, re: Hudson River
PCBs, June 11, 1998; (2) Letter to Mr. John F.
Welch, Jr., Chairman and Chief Executive Officer,
General Electric Corporation, from Mr. C. Scott
Vanderhoef, County Executive, County of Rockland,
re: Hudson River PCBs, June 11, 1998.)

P. 10.5923 - Letter to Ms. Jeanne M. Fox, Regional

10.5926 Administrator, U.S. EPA, Region II, from Mr. Thorn
Kleiner, Supervisor, Town of Orangetown, re:
Resolution Urging the Completion of the Hudson
River PCBs site reassessment, August 6, 1998.
(Attachment: Resolution No. 37, Memorializing
Resol Hudson River PCBs, prepared by Town of
Orangetown, January 20, 1998.)

P. 10.5927 - Letter to Mr. Richard Menocker, County Clerk,

10.5931 Legislature of Rockland County, from Mr. Richard
L. Caspe, Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re:
Resolution supporting the Hudson River PCBs site
reassessment, August 24, 1998. (Attachments: (1)
Letter to Honorable Carol Browner, Administrator,
U.S. EPA, from Mr. Richard Menocker, County
Clerk, Legislature of Rockland County, re:
Resolution No. 305 of 1998 Supporting the EPA's
Reassessment of PCB's in the Hudson River and the
Evaluation of Potential Remedial Actions, July
2 3, 1998; (2) Resolution No. 305 of 1998
Supporting the EPA's Reassessment of PCB's in the
Hudson River and the Evaluation of Potential
Remedial Actions, prepared by Legislature of
Rockland County, June 2, 1998)

163


-------
P. 10.5932 - Letter to Honorable Robert E. Phinney, Mayor,

10.5934 Village of South Glens Falls, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Village of
South Glens Falls resolution opposing U.S. EPA's
creation of a 160 square mile dump zone, December
3, 1998. (Attachments: (1) Letter to All
Interested Parties, from Mr. Douglas Tomchuk,
Project Manager, U.S. EPA, Region II, re:
Clarification of certain language in the
Feasibility Study Scope of Work, November 5,
1998; (2) Letter to Honorable Carol Browner,
Administrator, U.S. EPA, from Honorable Robert E.
Phinney, Mayor, Village of South Glens Falls, re:
Resolution opposing U.S. EPA's of a 160 square
mile dump zone, November 10, 1998.)

P. 10.5935 - Memorandum to Mr. Richard L. Caspe, Director,
10.5937 Emergency and Remedial Response Division, U.S.
EPA, Region II, from Town Board, Town of
Halfmoon, re: Resolution Opposing Dredging of the
Hudson River, December 15, 1998. (Attachment:
Resolution, prepared by Town Board, Town of
Halfmoon, November 17, 1998.)

P. 10.5938 - Letter to Ms. Maureen G. Nardacci, City Clerk,
10.5942 City of Rensselaer, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution in
support Hudson River PCBs Site Reassessment,
undated. (Attachments: (1) Letter to Ms. Carol
Browner, Administrator, U.S. EPA, from Ms.

Maureen G. Nardacci, City Clerk, City of
Rensselaer, re: Resolution in support Hudson
River PCBs Site Reassessment, January 9, 1998;
(2) Letter to Mr. Douglas Tomchuk, Project
Manager, U.S. EPA, Region II, from Ms. Maureen G.
Nardacci, City Clerk, City of Rensselaer, re:
Resolution in support Hudson River PCBs Site
Reassessment, January 9, 1998; (3) Resolution in
Support of EPA's Reassessment of PCBs in the
Hudson River and the Evaluation of Potential
Remedial Actions, prepared by City of Rensselaer,
January 7, 1998.)

164


-------
P. 10.5943 - Letter to Harrison Town - Village, Town Clerk,

165


-------
10.5946 from Mr. Richard L. Caspe, Director, U.S. EPA,

Region II, re: Resolutions supporting the Hudson
River PCBs site reassessment, undated.
(Attachments: (1) 98-47, Request to the
Environmental Protection Agency: Hudson River,
Resolution in Support of EPA's Reassessment of
PCBs in the Hudson River and to Evaluate
Potential Remedial Actions, prepared by Harrison
Town - Village, January 21, 1998; (2) 98-48
Request for the Designation of the Hudson River
as an American Heritage River, prepared by
Harrison Town - Village, January 21, 1998.)

P. 10.5947 - Letter to Honorable Kim Gamache, Mayor, Village
10.5949 of Schuylerville, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Village of
Schuylerville resolution opposing U.S. EPA's
creation of a 160 square mile dump zone, January
13, 1999. (Attachment: Resolution No. 1,
prepared by Village of Schuylerville, November 6,
1998.)

P. 10.5950 - Letter to Ms. Barbara J. Plummer, Clerk, Saratoga
10.5952 County Board of Supervisors, from Mr. Richard L.
Caspe, Director, U.S. EPA, Region II, re:
Resolution opposing U.S. EPA's creation of a 160
square mile dump zone, January 13, 1999.
(Attachment: Resolution 168 - 98, Opposing 160-
Square-Mile Dump Zone along Hudson River in
Washington, Saratoga, and Rensselaer Counties,
prepared by Saratoga County Board of Supervisors,
November 17, 1998.)

P. 10.5953 - Letter to Ms. Barbara Murphy, Deputy Town Clerk,
10.5955 Town of White Creek, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing U.S. EPA's creation of a 160 square mile
dump zone, January 13, 1999. (Attachment:
Resolution #25, Opposing 160-Square Mile Dump
Zone along Hudson River in Washington, Saratoga,
and Rensselaer Counties, prepared by Town of
White Creek Board, December 4, 1998.)

P. 10.5956 - Letter to Mr. Thomas J. Higgins, Mayor, City of
10.5958 Mechanicville, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response

166


-------
Division, U.S. EPA, Region II, re: Resolution
opposing U.S. EPA's creation of a 160 square mile
dump zone, January 20, 1999. (Attachment:
Resolution No. 99-98, prepared by City of
Mechanicville, November 4, 1998.)

P. 10.5959 - Letter to Ms. Janet E. Salisbury, Town Clerk,

10.5964 Town of Schaghticoke, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing U.S. EPA's creation of a 160 square mile
dump zone, January 20, 1999. (Attachment:

	Resolution Opposing 160-Sguare Mile Dump Zone

along Hudson River in Washington, Saratoga, and
Rensselaer Counties, prepared by Town Board, Town
of Schaghticoke, November 11, 1998.)

P. 10.5965 - Letter to Ms. Linda Miles, Town Clerk, Town of

10.5967 Fort Edward, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing U.S.

EPA's creation of a 160 square mile dump zone,
January 20, 1999. (Attachment: Resolution
Opposing 160-Sguare Mile Dump Zone Along Hudson
River in Washington, Saratoga, and Rensselaer
Counties, prepared by Town Board, Town of Fort
Edward, December 14, 1998.)

P. 10.5968 - Letter to Mr. William J. Bingel, Clerk,

10.5972 Intercounty Legislative Committee of the

Adirondacks, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing U.S.

EPA's creation of a 160 square mile dump zone,
January 27, 1999. (Attachment: Resolution No. 16
of 1998, Opposing 160-Sguare Mile Dump Zone Along
Hudson River in Washington, Saratoga, and
Rensselaer Counties, prepared by Intercounty
Legislative Committee of the Adirondacks,

November 19, 1998.)

P. 10.5973 - Letter to Ms. Linda Miles, Town Clerk, Town of

10.5975 Fort Edward, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution concerning the
Hudson River PCBs Site Reassessment Study,
February 16, 1999. (Attachment: Resolution

167


-------
Number 80 of 1999, prepared by Town Board, Town
of Fort Edward, December 17, 1999.)

P. 10.5976 - Letter to Ms. Linda Miles, Town Clerk, Town of

10.5979 Fort Edward, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing U.S.

EPA's creation of a 160 square mile dump zone,
February 16, 1999. (Attachments: (1) Letter to
Honorable Carol Browner, Administrator, U.S. EPA,
from Ms. Linda Miles, Town Clerk, Town of Fort
Edward, re: Resolution Number 69 of 1998; (2)
Resolution Opposing 160-Sguare Mile Dump Zone
along Hudson River in Washington, Saratoga, and
Rensselaer Counties, prepared by Town Board, Town
of Fort Edward, December 14, 1998.)

P. 10.5980 - Letter to Ms. Nancy P. O'Brien, Clerk, Village of
10.5982 Waterford, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing U.S.

EPA's creation of a 160 square mile dump zone,
February 16, 1999. (Attachment: Resolution
Opposing 160-Sguare Mile Dump Zone Along Hudson
River in Washington, Saratoga, and Rensselaer
Counties, prepared by Village of Waterford,
December 9, 1998.)

P. 10.5983 - Letter to Ms. Jean E. Nolan, Village Clerk,

10.5985 Village of Victory, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution
opposing U.S. EPA's creation of a 160 square mile
dump zone, March 4, 1999. (Attachment:

Resolution #3, Resolution Opposing 160-Sguare
Mile Dump Zone Along Hudson River in Washington,
Saratoga, and Rensselaer Counties, prepared by
Village of Victory, November 3, 1998.)

P. 10.5986 - Letter to Fort Edward Town Board Members, Fort
10.5987 Edward Town Board, from Ms. Holly E. Mabb, RMC
Kingsbury Town Board, Town of Kingsbury, re:
Resolution adopted by the Kingsbury Town Board at
the regular meeting held Monday, July 12, 1999,
July 16, 1999. (Attachment: Resolution 11 -
1999, Resolution Urging The Environmental
Protection Agency To Submit Both Its and General
Electric's Model To Simultaneous Independent Peer

168


-------
Review, prepared by the Town Board, Town of
Kingsbury, July 12, 1999.)

P. 10.5988 - Letter to Mr. John E. Zweig, Supervisor, Town of
10.5990 Poestenkill, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Letter in support of an
independent peer review of all PCB-modeling
studies developed for the Hudson River PCBs
Superfund site, July 22, 1999. (Attachment:
Letter to Ms. Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, from Mr. John
E. Zweig, Supervisor, Town of Poestenkill, re:
Request to support independent review process,
June 25, 1999.)

P. 10.5991 - Letter to Town of Schaghticoke, County of

10.5995 Rensselaer, State of New York, from Ms. Janet E.

Salisbury, Town Clerk, Town of Schaghticoke, re:
Regular meeting of the Town Board of the Town of
Schaghticoke, State of New York, held on July 14,
1999, July 28, 1999. (Attachment: Resolution
Urging The Environmental Protection Agency To
Submit Both Its and General Electric's Model To
Simultaneous Independent Peer Review, prepared by
Town Board, Town of Schaghticoke, July 14, 1999.)

P. 10.5996 - Letter to Ms. Barbara J. Plummer, Clerk, Saratoga
10.6000 County Board of Supervisors, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution on
the peer review of all PCB-modeling studies
developed for the Hudson River PCBs Superfund
site, August 12, 1999. (Attachment: Resolution
128-99 Reguesting USEPA To Conduct Peer Review Of
All Modeling Information Relating To The Hudson

River Superfund PCB Reassessment, prepared by
Saratoga County Board of Supervisors, July 20,
1999. )

P. 10.6001 - Letter to Honorable Robert E. Phinney, Mayor,

10.6009 Village of South Glens Falls, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution on
the peer review of all PCB-modeling studies
developed for the Hudson River PCBs Superfund
site, August 12, 1999. (Attachments: (1) Village
of South Glens Falls Resolution, prepared by

169


-------
Village Board, Village of South Glens Falls, July
8, 1999; (2) Letter to Honorable Carol M.

Browner, Administrator, U.S. EPA, from Ms. Jeanne
M. Fleury, Town Clerk, Town of Moreau, re: Peer
review resolutions, July 14, 1999; (3)
Resolutions, prepared by Town Board, Town of
Moreau, undated.)

P. 10.6010 - Letter to Whom it May Concern, Town of

10.6013 Northumberland, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution on
the peer review of all Hudson River PCBs modeling
studies, August 13, 1999. (Attachment:

Resolution #33 of 1999 Requesting US EPA to
Conduct Peer Review and/or Reconciliation of all
Modeling Information relating to the Hudson River
Superfund PCB Reassessment Prior to Determining
Human Health and Ecological Risks, prepared by
Town Board, Town of Northumberland, July 12,

1999.)

P. 10.6014 - Letter to Whom it May Concern, Town of Saratoga,
10.6017 from Mr. Richard L. Caspe Director, Emergency and
Remedial Response Division, U.S. EPA, Region II,
re: Resolution on the peer review of all Hudson
River PCB modeling studies, August 13, 1999.
(Attachment: Resolution: Reguesting U.S. EPA To
Conduct Peer Review And/Or Reconciliation Of All
Modeling Information Relating To The Hudson River
Superfund PCB Reassessment Prior To Determining
Human Health And Ecological Risks, prepared by
Town Board, Town of Saratoga, July 12, 1999.)

P. 10.6018 - Letter to Ms. Rose Petronis, Town Clerk, Town of
10.6022 Stillwater, from Mr. Richard L. Caspe Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution on the peer review
of all Hudson River PCB-modeling studies, August
13, 1999. (Attachments: (1) Letter to Ms. Carol
Browner, Administrator, U.S. EPA, from Ms. Rose
Petronis, Town Clerk, Town of Stillwater, re:
Resolution #67, July 16, 1999; (2) Resolution:
Reguesting United States Environmental Protection
Agency To Conduct Peer Review And/Or
Reconciliation Of All Modeling Information
Relating To The Hudson River Superfund PCB
Reassessment Prior To Determining Human Health

170


-------
And Ecological Risks, prepared by Town Board,
Town of Stillwater, July 15, 1999.)

P. 10.6023 - Letter to Ms. Mary J. Pearson, Town Clerk, Town

10.6027 of Halfmoon, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution on the peer
review of all Hudson River PCB-modeling studies,
August 13, 1999. (Attachments: (1) Memorandum to
Ms. Jeanne M. Fox, Regional Administrator, U.S.
EPA, Region II, from Town Board of Halfmoon, re:
USEPA Resolution, July 22, 1999; (2) Resolution
Requesting USEPA To Conduct Peer Review And/Or
Reconciliation Of All Modeling Information
Relating To The Hudson River Superfund PCB
Reassessment Prior To Determining Human Health
And Ecological Risks, prepared by Town Board,

Town of Halfmoon, July 22, 1999.)

P. 10.6028 - Letter to Ms. Diana Eggleston, Town Clerk, Town
10.6031 of Argyle, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution on the peer review
of all Hudson River PCB-modeling studies, August
13, 1999. (Attachment: Resolution 34-99 Urging
the EPA to Submit Both Its and GE's Model to
Simultaneous, Independent Peer Review, prepared
by the Town Board, Town of Argyle, July 21,

1999.)

P. 10.6032 - Resolution No. 62, 1999, Resolution Urging EPA To
10.6033 Submit Both Its and GE's Model To Simultaneous,
Independent Peer Review, prepared by Town Board,
Town of Brunswick, August 12, 1999.

P. 10.6034 - Letter to Ms. Merrilyn Pulver, Councilwoman, Town
10.6043 of Fort Edward, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution on
the peer review of all Hudson River PCB-modeling
studies, August 25, 1999. (Attachments: (1)
Letter to Supervisor, from Ms. Merrilyn Pulver,
Councilwoman, Town of Fort Edward, re: Resolution
regarding the U.S. EPA's reassessment of the
Hudson River PCB Superfund Project, June 14,
19 9 9; (2) Resolution Number 40 of 1999, Urging

Simultaneous, Independent Peer Review, prepared

171


-------
by Town Board, Town of Fort Edward, June 14,
1999; (3) Letter to Mr. Douglas Tomchuk, Project
Manager, U.S. EPA, Region II, from Ms. Merrilyn
Pulver, Councilwoman, Town of Fort Edward, re:
Baseline Modeling Report, June 18, 1999; (4)
Resolution No. 39, Urging EPA to Submit both its
and GE's Model to Simultaneous, Independent Peer
Review, prepared by Town Board, Town of Fort
Edward, undated; (5) Resolution No. 180, Urging
EPA to Submit both its and GE's Model to
Simultaneous, Independent Peer Review, prepared
by Washington County Board of Supervisors, June
18, 1999.)

P. 10.6044 - Letter to Ms. Sandy Huffer, Deputy Clerk,

10.6049 Washington County Board of Supervisors, from Mr.

Richard L. Caspe Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re:
Resolution on the peer review of all Hudson River
PCB-modeling studies, September 1, 1999.
(Attachments: (1) Memorandum to Ms. Carol
Browner, Administrator, U.S. EPA, from Ms. Sandy
Huffer, Deputy Clerk, Washington County Board of
Supervisors, re: Resolution #180, June 21, 1999;
(2) Resolution #180, prepared by Washington
County Board of Supervisors, June 18, 1999.)

P. 10.6050 - Letter to Ms. Kim N. Gamache, Mayor, Village of
10.6052 Schuylerville, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution on
the peer review of all Hudson River PCB-modeling
studies, September 16, 1999. (Attachment:
Resolution, prepared by Village Board, Village of
Schuylerville, August 11, 1999.)

P. 10.6053 - Letter to Councilman Schroeder, Town of

10.6056 Charlton, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution on the peer review
of all Hudson River PCB-modeling studies,
September 16, 1999. (Attachment: Resolution 88,
Urging The Environmental Protection Agency To
Submit Both Its and General Electric's Model to
Simultaneous Independent Peer Review, prepared by
Town Board, Town of Charlton, August 9, 1999.)

172


-------
P. 10.6057 - Letter to Harold E. Robillard, Clerk, Warren

10.6060 County Board of Supervisors, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution on
the peer review of all Hudson River PCB-modeling
studies September 16, 1999. (Attachment:
Resolution No. 444 Of 1999, Supporting Washington
County Resolution No. 180 Of 1999 And Town Of
Fort Edward Resolution No. 40 Of 1999 Both
Entitled, "Urging EPA To Submit Both Its And GE's
Model To Simultaneous Independent Peer Review,"
prepared by Warren County of Board Supervisors,
August 13, 1999.)

P. 10.6061 - Letter to Ms. Shirley M. Lamb, Town Clerk, Town
10.6065 of Easton, from Mr. Richard L. Caspe, Director
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution on the peer review
of all Hudson River PCB-modeling studies, October
6, 1999. (Attachment: Resolution #104-99,
Resolution Urging The Environmental Protection
Agency To Submit Both Its And General Electric's
Model To Simultaneous Independent Peer Review,
prepared by Town Board, Town of Easton, August
17, 1999.)

P. 10.6066 - Letter to Ms. Pauline D. Levo, Town Clerk, Town
10.6070 of Greenfield, from Mr. Richard L. Caspe,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Resolution on
the peer review of all Hudson River PCB-modeling
studies, October 20, 1999. (Attachments: (1)
Resolution #122 - Reguest USEPA to Conduct Peer
Review and/or Reconciliation of all Model

	Information Relating to the Hudson River

	Superfund PCB Reassessment Prior to Determining

Human Health and Ecological Risks, prepared by
Town Board, Town of Greenfield, August 12, 1999;
(2) Controlled Correspondence (w/attachment) to
Ms. Jeanne M. Fox, Regional Administrator, U.S.
EPA, Region II, from Ms. Pauline D. Levo, Town
Clerk, Town Greenfield, September 17, 1999.

P. 10.6071 - Letter to Mr. Farr, Councilman and Mr. Liebl,

10.6075 Councilman, Town of Stony Creek, from Mr. Richard
L. Caspe Director, U.S. EPA, Region II, re:
Resolution on the peer review of all Hudson River
PCB-modeling studies, February 10, 2000.

173


-------
(Attachment: Resolution No. 106, Resolution
Urging the Environmental Protection Agency to

Simultaneous Independent Peer Review, prepared by
Town Board, Town of Stony Creek, July 20, 1999.)

P. 10.6076 - Letter to Honorable Jeanne M. Fox, Regional
10.6079 Administrator, U.S. EPA, Region II, from Ms.

Holly E. Mabb, RMC, Town Clerk, Town of
Kingsbury, re: Town of Kingsbury resolution
opposing dredging, April 14, 2000. (Attachment:
Resolution No. 2 of 2000, A Resolution Opposing
the Dredging of the Upper River and Creation of a
Toxic Waste Landfill, prepared by Kingsbury Town
Board, April 10, 2000.)

P. 10.6080 - Notice: Town of Easton, Special Meeting of the
10.6082 Town Board, April 24, 2000. (Attachment:

Resolution No. 64-00, Opposing the Dredging of
the Upper River and Creation of a Toxic Waste
Landfill, prepared by Town Board, Town of Easton,
April 24, 2000.

P. 10.6083 - Resolution No. 3 of 2000, Opposing Dredging of
10.6086 the Upper Hudson River and Creation of a Toxic
Waste Landfill, prepared by Town Board, Town of
Hampton, May 24, 2000.

P. 10.6087 - Letter to Ms. Jeanne M. Fleury, Town Clerk, Town
10.6093 of Moreau, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing dredging
of the Upper Hudson River and creation of a toxic
waste landfill, June 9, 2000. (Attachments: (1)
Letter to Honorable Carol M. Browner,
Administrator, U.S. EPA, prepared by Ms. Jeanne
M. Fleury, Town Clerk, Town of Moreau, re:
Resolution opposing dredging of the Upper Hudson
River and creation of a toxic waste landfill,
April 13, 2000; (2) Resolution, prepared by Town
Board, Town of Moreau, April 12, 2000.)

P. 10.6094 - Letter to Ms. Diana Eggleston, Town Clerk, Town
10.6099 of Argyle, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Argyle resolution
opposing dredging, June 9, 2000. (Attachments:
(1) Letter to Honorable Jeanne M. Fox, Regional

174


-------
Administrator, U.S. EPA, Region II, from Ms.

Diana Eggleston, Town Clerk, Town of Argyle, re:
Resolution opposing dredging of Upper Hudson
River, April 19, 2000; (2) Resolution 39-00,
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Argyle, April 19, 2000.)

P. 10.6100 - Letter to Mrs. Mary J. Pearson, Town Clerk, Town
10.6105 of Halfmoon, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Halfmoon resolution
opposing dredging and landfill, June 9, 2000.
(Attachments: (1) Memorandum to Honorable Jeanne
M. Fox, Regional Administrator, U.S. EPA, Region
II, from Ms. Mary J. Pearson, Town Clerk, Town of
Halfmoon, re: Resolution Opposing Dredging of the
Upper Hudson River and Creation of A Toxic Waste
Landfill, April 19, 2000; (2) Resolution:

Opposing Dredging of the Upper Hudson River and
Creation of A Toxic Waste Landfill, prepared by
Town Board, Town of Halfmoon, April 19, 2000.)

P. 10.6106 - Letter to Ms. Nancy O'Brien, Clerk, Village of
10.6110 Waterford, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Village of Waterford
resolution opposing dredging and landfill, June
9, 2000. (Attachments: (1) Letter to Whom It May
Concern, from Ms. Nancy O'Brien, Clerk, Village
of Waterford, re: Resolution opposing dredging of
the Upper Hudson River and creation of a toxic
waste landfill, April 26, 2000; (2) Resolution
No. 2 Opposing Dredging of the Upper Hudson River
and Creation of A Toxic Waste Landfill, prepared
by Village Board, Village of Waterford, April 12,
2000 . )

P. 10.6111 - Letter to Ms. Lori Mercure, Town Clerk, Town of
10.6116 Hartford, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Hartford resolution
opposing dredging, June 9, 2000. (Attachments:
(1) Letter to Honorable Jeanne M. Fox, Regional
Administrator, U.S. EPA, Region II, from Ms. Lori
Mercure, Town Clerk, Town of Hartford, re:
Resolution Opposing Dredging of the Upper Hudson
River and Creation of A Toxic Waste Landfill, May

175


-------
10, 2000; (2) Resolution No. 00073 Opposing
Dredging of the Upper Hudson River and Creation
of A Toxic Waste Landfill, prepared by Town
Board, Town of Hartford, April 11, 2000.)

P. 10.6117 - Letter to Honorable Carol Browner, Administrator,
10.6120 U.S. EPA, from local elected leaders of

communities along the Upper Hudson River, re
Hudson River PCB Superfund Site, June 16, 2000.

P. 10.6121 - Letter to Ms. Shirley M. Lamb, Town Clerk, Town
10.6125 of Easton, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Easton resolution
opposing dredging, June 28, 2000. (Attachment:
Resolution No. 64-00, Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste
Landfill, prepared by Town Board, Town of Easton,
April 24, 2000 . )

P. 10.6126 - Letter to Ms. Jane A. Keys, Town Clerk, Town

10.6132 of Jackson, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Town of Jackson resolution
opposing dredging, June 28, 2000. (Attachment:
Resolution No. 10, Opposing Dredging of the Upper
Hudson River and Creation of a Toxic Waste
Landfill, prepared by Town Board, Town of
Jackson, May 3, 2000.)

P. 10.6133 - Letter to Ms. Michelle A. Hoag, Town Clerk, Town
10.6137 of Pittstown, Clerk's Office, from Mr. Richard L.

Caspe, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Town of
Pittstown's resolution opposing dredging, August
3, 2000. (Attachment: Resolution No. 70, 2000
Opposing Dredging of the Upper Hudson River and
Creation of a Toxic Waste Landfill, prepared by
Town Board, Town of Pittstown, May 8, 2000.)

P. 10.6138 - Letter to Mr. William J. Mevec, Town Clerk, Town
10.6143 of Milton, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution opposing dredging
of the Upper Hudson River and creation of a toxic
waste landfill, August 7, 2000. (Attachments:
(1) Letter to Ms. Carol M. Browner,

Administrator, U.S. EPA, prepared by Mr. William

176


-------
J. Mevec, Town Clerk, Town of Milton, re:
Resolution opposing dredging of the Upper Hudson
River and creation of a toxic waste landfill,

June 28, 2000, (2) Resolution #32-2000,

Resolution Requesting United States Environmental
Protection Agency To Conduct Peer Review And/Or
Reconciliation Of All Modeling Information
Relating To The Hudson River Superfund PCB
Reassessment And Not Recommend Dredging, prepared
by Town Board, Town of Milton, April 19,

2000).

P. 10.6144 - Resolution No. 20, prepared by Town Board,

10.6144 Village of Fort Edward, December 4, 2000.

P. 10.6145 - Letter to Mr. George W. Bush, President-Elect,
10.6147 Ms. Carol Browner, Administrator, U.S. EPA, Ms.

Jeanne M. Fox, Regional Administrator, U.S. EPA,
Region II, Ms. Hillary Rodham Clinton, United
States Senator-Elect, Mr. Charles Schumer, United
States Senator, Mr. John Sweeney, United States
Representative, Mr. George E. Pataki, New York
Governor, Mr. John Cahill, Commissioner, New York
State Department of Environmental Conservation,
Mr. Ronald B. Stafford, New York State Senator,
Mr. Bobby D'Andrea, New York State Assemblyman,
Ms. Elizabeth Little, New York State
Assemblywoman, from Ms. Elaine A. Kelly, Town
Clerk, Town of Greenwich, re: Town of Greenwich
resolution opposing dredging, December 28, 2000.
(Attachment: Resolution: Opposing Dredging of the
Upper Hudson River and Creation of a Toxic Waste
Landfill, prepared by Town Board, Town of
Greenwich, December 28, 2000.)

P. 10.6148 - Letter to Ms. Elaine A. Kelly, Town Clerk, Town
10.6154 of Greenwich, from Mr. Richard L. Caspe,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Town of
Greenwich resolution opposing dredging, undated.
(Attachments: (1) Letter to Ms. Carol Browner,
Administrator, U.S. EPA, Ms. Jeanne M. Fox,
Regional Administrator, U.S. EPA, Region II, Mr.
Daniel Patrick Moynihan, United States Senator,
Mr. Charles Schumer, United States Senator, Mr.
John Sweeney, United States Representative, Mr.
George E. Pataki, New York Governor, Mr. John
Cahill, Commissioner, New York State Department

177


-------
of Environmental Conservation, Mr. Ronald B.
Stafford, New York State Senator, Mr. Bobby
D'Andrea, New York State Assemblyman, Ms.
Elizabeth Little, New York State Assemblywoman,
from Ms. Elaine A. Kelly, Town Clerk, Town of
Greenwich, re: Town of Greenwich resolution
opposing dredging, April 18, 2000. (2)

Resolution No. 72 of 2000, Opposing Dredging of
the Upper Hudson River and Creation of a Toxic
Waste Landfill, prepared by Town Board, Town of
Greenwich, April 11, 2000.)

P. 10.6155 - Letter to Ms. Carol Roper, Supervisor, Town of
10.6157 New Paltz, from Mr. Richard L. Caspe, Director,
Emergency and Remedial Response Division, U.S.
EPA, Region II, re: Resolution supporting Hudson
River PCBs site reassessment, January 22, 2001,
(Attachment: Resolution In Support Of EPA's
Reassessment Of PCBs In The Hudson River And The
Evaluation Of Potential Remedial Actions,
prepared by Town of New Paltz, November 16,2000.)

P. 10.6158 - Letter to Honorable Jeanne M. Fox, Regional

10.6161 Administrator, U.S. EPA, Region II, from Town of
Halfmoon Town Board, Re: Resolution Opposing
Dredging of the Upper Hudson River and Creation
of a Toxic Waste Landfill, February 28, 2001,
(Attachment: Resolution: Opposing EPA's Proposed
Dredging of Upper Hudson River and Siting of De-
Watering/Treatment /Transfer Facilities in the
Town of Halfmoon, prepared by Town Board, Town of
Halfmoon, February 20, 2001.)

P. 10.6162 - Letter to Mr. Douglas Tomchuck, Project Manager,
10.6164 U.S. EPA, Region II, from Ms. Patricia J.

Hohmann, Clerk, Dutchess County Legislature, Re:
Dutchess County Resolution, April 9, 2001.
(Attachment: Resolution No. 201075 Re: Concerns
and Comments on the United States Environmental
Protection Agency's Plans to Remediate PCB
Contamination of the Hudson River, prepared by
Dutchess County Legislature, March 12, 2001.)

P. 10.6165 - Letter to Honorable Jeanne M. Fox, Regional
10.6169 Administrator, U.S. EPA, Region II, from Mr.

Richard Menocker, Clerk, Rockland County
Legislature, re: Resolution No. 181 of 2001 -
Supporting The United States Environmental

178


-------
Protection Agency's Plan For Remedial Action To
Clean Up PCBs In the Hudson River, May 10, 2001.
(Attachments: (1) Memorandum to Mr. Richard
Menocker, Clerk, Rockland County Legislature,
from Mr. C. Scott Vanderhoef, County Executive,
Rockland County, re: Resolution No. 181 of 2001 -
Supporting The United States Environmental
Protection Agency's Plan For The Remedial Action
To Clean Up PCB's In The Hudson River, May 3,
2 0 01; (2) Resolution No. 181 of 2001 - Supporting
the United States Environmental Protection
Agency's Plan For The Remedial Action To Clean Up
PCB's In The Hudson River, prepared by Rockland
County Legislature, April 3, 2001.)

P. 10.10440 -Resolution No. 79, Opposing Dredging of the Hudson

	10.10441 River and Creation of a Toxic Waste Landfill,

prepared by Town of Corinth, Richard B. Lucia,
Supervisor, July 3, 1997.

P. 10.10442 -Letter to Honorable Merrilyn Pulver, Town

10.10445 Councilwoman, Town of Fort Edward, from Mr.

Richard J. Leggett, Sr., Supervisor, Town of
Ghent, re: Resolution No. 17 opposing further
dredging of the Hudson River. (Attachment: Town
of Ghent, Columbia County, New York, Resolution
No. 17, March 19, 1998.)

P. 10.10446 -Letter to Honorable Merrilyn Pulver,

10.10448	Councilwoman, Town of Fort Edward, from Ms.
Charlotte B. Miller, Town Clerk, Town of Ancram,
re: Resolution No. 32. (Attachment: Town of
Ancram, Resolution #32, Opposition of a PCB
Landfill for Hudson River Dredging Project, March
17, 1998.)

P. 10.10449 -Letter to Honorable Merrilyn Pulver, Town

10.10449	Councilwoman, Town of Fort Edward, from Ms. Linda
S. Fix, Town Clerk, Town of Livingston, re:
Resolution opposing dredging project, April 17,
1998 .

P. 10.10450 -Resolution #278, Resolution Opposing 160-Sguare-

	10.10452 Mile Dump Zone Along Hudson River in Washington,

Saratoga and Rensselaer Counties, prepared by Town
Board, Town of Wilton, November 5, 1998.

179


-------
P. 10.10453 -Resolution Opposing Dredging of the Upper Hudson

	10.10454 River and Creation of a Toxic Waste Landfill, Town

of Cambridge, April 10, 2000.

P. 10.10455 -Resolution Adopted on 4/3/00, South Glens Falls

	10.1045 6 Village Board, Opposing Dredging of the Upper

Hudson River and Creation of a Toxic Waste
Landfill, April 10, 2000.

P. 10.10457 -Resolution No. 24, Opposing Dredging of the

	10.10458 Upper Hudson River and Creation of a Toxic Waste

Landfill, Town of Hebron, April 10, 2000.

P. 10.10459 -Resolution #11-00, Resolution Opposing Dredging

	10.1045 9 of the Upper Hudson River and the Creation of a

PCB Landfill Project as a Remediation Option for
PCB Contamination, Town of Dresden, April 10,

2000 .

P. 10.10460 -Resolution #110, Opposing Dredging of the Upper

	10.104 61 Hudson River and Creation of a Toxic Waste

Landfill, Village of Corinth, April 12, 2000.

P. 10.10462 -Resolution No. 35, 2000, Resolution Opposing

	10.10464 Dredging of the Upper Hudson River and Creation of

a Toxic Waste Landfill, Town of Brunswick, Regular
Meeting, April 13, 2000.

P. 10.10465 -Resolution #111-97, Opposing Dredging of PCBs

	10.10468 from the Hudson River, Town of Edinburg, April 20,

2000 .

P. 10.10469 -Official Proclamation, Office of Mayor Ballston
10.10470 Spa, N.Y., re: Opposition to Hudson River

remediation measures that involve dredge-and-land-
fill of any kind, April 24, 2000.

P. 10.10471 -Resolution #27 of 2000, Opposing Dredging of the

	10.10473 Upper Hudson River and Creation of a Toxic Waste

Landfill, Town of Stillwater, April 25, 2000.

P. 10.10474 -Resolution No. 2-2000, Opposing Dredging of the

	10.10475 Upper Hudson River and Creation of a Toxic Waste

Landfill, Victory Village, (fax date May 1, 2000.)

P. 10.10476 -Resolution #21-98, PCB Dredge on the Upper
10.10476 Hudson River & Landfill Project, Town of
Stephentown, (fax date May 4, 2000.)

180


-------
P. 10.10477 -Resolution #40, Opposing Dredging of the Upper

	10.1047 9 Hudson River and Creation of a Toxic Waste

Landfill, Town of Thurman, May 16, 2000.

P. 10.10480 -Resolution #113, re: Opposition to Hudson River
10.10481 remediation measures that involve dredge and

landfill efforts of any kind, Town of Waterford,
June 6, 2000.

P. 10.10482 -Resolution No. 243, re: Glens Falls Common

10.10484 Council Expresses its opposition to Hudson River
remediation measures that involve dredge-and-
landfill efforts of any kind, June 19, 1997.

P. 10.10493 -Resolution Number 11 of 1995, Reguest for New

	10.10493 York State to Look into Removing Refill from the

Fort Edward Yacht Basin, Champlain Canal, prepared
by Town of Fort Edward, May 8, 1995.

P. 10.10494 -Resolution Number 80 of 1999, prepared by Town of
10.10495 Fort Edward, re: resolution that the Town of Fort
Edward opposes the lawsuit filed by the New York
State Attorney General related to navigational
dredging in the Champlain Canal and that the Town
of Fort Edward urges the New York State Canal
Corporation to work with other interested parties
to evaluate whether navigational dredging is
necessary and desirable, December 13, 1999.

P. 10.10496 -Clean Hudson New Jersey Coalition, Supporters of
10.10497 Hudson River PCB Cleanup as of July 2001.

News and Media

P. 10.10416 -News: Fewer Cruises, State Figures Show

10.10417 Champlain Canal Use Leveled Off in '99, Glen Falls
Post Star, March 6, 2000.

P. 10.10418 -News: Village Urges EPA to Dredge Basin, Glen
10.10419 Falls Post Star, December 5, 2000.

P. 10.10420 -News release: Environmental Coalition Releases

	10.10423 List of Municipal Resolutions in Support of Hudson

River Cleanup, prepared by Friends of Clean
Hudson, April 2, 2001.

181


-------
P. 10.10424 -News: GE Did Not Bring Good Things To Our Lives,

10.10424	New York Times, June 2001.

P. 10.10425 -News: GE Brought PCBs Into Mary Beth's Life, New

10.10425	York Times, June 13, 2001.

P. 10.10426 -News: PCBs Hamper Dredging of Canal, Times
10.10427 Union, July 1, 2001.

p. 10.10428 -News: Report urges state to widen backyard PCB

	10.10438 cleanup, The Post Star, Top Story, by Mr. Thorn

Randall, July 11, 2001.

P. 10.10439 -News: Hudson's Low Water Levels Affect

.10.10439 Navigation, Daily Gazette, July 18, 2001

1989

p. 10.10535 -Newspaper Article: Officials Talk to Residents

10.10535 About PCB Project, The Post Star, August 1989, p.
A1.

1990

P. 10.10536 -Newspaper Article: After 15 Years, Hudson Still

10.10537	Has PCB's, The New York Times, May 16, 1990, p.
B1.

P. 10.10538 -Newspaper Article: Review Set Tonight of PCBs

10.10538	Cleanup Plan, The Times Union, December 13, 1990,
p. B12.

p. 10.10539 -Newspaper Article: Don't Dredge PCBs, Public

10.10539	Tells EPA, The Saratogian, December 14, 1990, pp.
1A, 10A.

P. 10.10540 -Newspaper Article: EPA River Meeting Dominated By

10.10540	PCBs, The Times Union, December 14, 1990.

1991

P. 10.10541 -Newspaper Article: EPA To Hold Session About

10.10541	Report On PCB In Hudson, The Saratogian, August
28, 1991.

182


-------
P. 10.10542 -Newspaper Article: EPA To Study Hudson PCBs/

10.10542	Westchester, Putnam Residents Threatened By PCB-
Laden Fish, Gannett Westchester Newspaper, March
28, 1991, pp. 1, 12.

P. 10.10543 -Newspaper Article: Hearing Focuses On Delay In

10.10543	PCBs' Removal, The Times Herald Record, September
11, 1991, p. 16.

P. 10.10544 -Newspaper Article: GE, EPA Squabble Over Hudson

10.10544	Fishery, The Times Union, September 13, 1991.

P. 10.10544 -Newspaper Article: PCBs In Hudson Debated, The

10.10544	Poughkeepsie Journal, September 12, 1991.

P. 10.10545 -Newspaper Article: Decker Urges EPA Not To Dredge

10.10545	PCBs, The Post Star, September 13, 1991, pp. Bl,

B2 .

1992

P. 10.10546 -Newspaper Article: Keep GE At Arms Length, The

10.10546	Poughkeepsie Journal, April 4, 1992, p. 6A.

P. 10.10547 -Newspaper Article: PCB Toxins In Hudson River

10.10547	Prompts Fish To Evaluate Situation; Delays Hit,
The Cornwall Local, September 9, 1992, p. 2.

P. 10.10548 -Newspaper Article: PCBs: The Damage Done/A

10.10548	Tortured History: 45 Years of Neglect, The
Poughkeepsie Journal, October 4, 1992, p. 12A.

P. 10.10549 -Newspaper Article: The Damage Done-Purge The

10.10549	Hudson PCBs - The Hudson Can't Heal

Itself/Cleaner, But Not Clean, The Poughkeepsie
Journal, October 11, 1992, p. 18A.

P. 10.10500 -Newspaper Article: The Damage Done-Purge The

10.10500 Hudson PCBs - Begin The Cleanup/Two Rivers, Two
Problems, The Poughkeepsie Journal, October 18,
1992, p. 12A.

P. 10.10551 -Newspaper Article: The Damage Done-Purge The

10.10551 Hudson PCBs - PCBs Do Hurt People/GE Used Undue
Influence, Delayed Report, The Poughkeepsie
Journal, October 25, 1992, p. 16A.

183


-------
1993

P. 10.10552 -Newspaper Article: PCBs Triple In Hudson River

10.10552	Fish; Jorling Names GE As Likely Source, The
Albany Times, February 23, 1993.

P. 10.10553 -Newspaper Article: PCBs Still Flow From GE Plant

10.10553	Into Hudson, The Times Union, May 27, 1993, p. A-

1.

P. 10.10554 -Newspaper Article: Roiling On The River - To

10.10555	Dredge Or Not To Dredge?, Metroland, May 27 - June

2,	1993, pp. 8, 9.

P. 10.10556 -Newspaper Article: G.E. To Stop Flow of PCB's

10.10556	Into the Hudson River, The New York Times Metro,
July 18, 1993, p. 38.

P. 10.10557 -Newspaper Article: G.E. To Pay Fishermen Over

10.10557	Polluted Striped-Bass Waters, The New York Times
Metro, August 13, 1993, p. B5.

P. 10.10558 -Newspaper Article: Thought For Food - PCBs In

10.10559 Seafood, Asbury Park Press, December 1993, pp. Al,
A2 .

1994

P. 10.10560 -Newspaper Article: PCB Study Is Running Late -

10.10562	EPA Underestimated, The Schenectady Gazette, March
6, 1994, pp. Bl, B9.

P. 10.10563 -Newspaper Article: State Issues Warnings On

10.10563	Eating Sport Fish, The New York Times Metro, April
23, 1994, p. 30.

P. 10.10564 -Newspaper Article: GE Mops Up PCBs At River Mill

10.10564	Site, The Times Union, October 3, 1994 (circa),
p. B-l.

1995

P. 10.10565 -Newspaper Article: Keep up the fight over PCBs,
10.10566 Editorial, The Poughkeepsie Journal, October 8,
1995.

184


-------
1996

P. 10.10567	-Newspaper Article: Group Hits State Treatment of

10.10567	G.E., The Daily Gazette, February 27, 1996.

1997

P. 10.10568	-Newspaper Article: The PCB War Heats Up, The New

10.10568	York Times Editorials/Letters, March 2, 1997.

P. 10.10569 -Newspaper Article: New York Joins Inquiry Into

10.10569	River Damage, The New York Times, July 30, 1997,
p. D4 .

P. 10.10570 -Newspaper Article: EPA Will Take More Time To

10.10570	Study Hudson Dredging, The Times Union-Capital
Region, August 6, 1997.

P. 10.10571 -Newspaper Article: EPA: PCBs Are Coming From

10.10572 River Sediments, The Post Star, August 7, 1997, p.
A1.

P. 10.10573 -Newspaper Article: Babbitt Assails G.E. Over

10.10574	Delay In Ridding Hudson of Chemicals, The New York
Times, September 26, 1997, p. B1.

1998

P. 10.10575 -Newspaper Article: GE's Hudson River Newsletter

10.10575	Misleads the Public, Critics Say, The Times Union,
January 18, 1998.

P. 10.10576 -Newspaper Article: G.E. Wins Delay of Study On

10.10576	Cleaning Up Hudson, The New York Times Metro,
February 25, 1998, p. B1.

P. 10.10577 -Newspaper Article: Toxic Chemicals From 70's

10.10578 Still Polluted Hudson, Study Says, The New York
Times, July 24, 1998, pp. Bl, B9.

P. 10.10579 -Newspaper Article: PCBs Moving, EPA Says, The

10.10580	Times Union, July 24, 1998, pp. Al, A8.

P. 10.10581 -Online News Article: EPA Opts To Hold Off On PCB

10.10581	Dredging, The Times Union, December 18, 1998.

185


-------
1999

P. 10.10582 -Newspaper Article: EPA Says PCBs Still Very High,
10.10583 The Daily Gazette, February 25, 1999, pp. Al, A4.

P. 10.10584 -Newspaper Article: Activists Claim GE Delaying

10.10585 PCB Cleanup, The Daily Gazette, June 2, 1999, pp.
Bl, B2.

P. 10.10586 -Newspaper Article: EPA Says Hudson's Fish Pose

10.10587	Health Risk, The Times Union, August 5, 1999, pp.
Al, A12.

P. 10.10588 -Newspaper Article: State Sues G.E. Over Pollution

10.10588	In the Hudson, The New York Times, November 16,
1999, pp. Bl, B10.

2000

P. 10.10589 -Newspaper Article: Final Study Bolsters Case For
10.10589 Requiring G.E. To Clean Up Hudson River, The New
York Times, January 5, 2000.

P. 10.10590 -Online News Article: GE Points Out Report Is

10.10591 Theory, The Poughkeepsie Journal, January 5, 2000

P. 10.10592 -Online News Article: PCB Cleanup Plan Set, The
10.10593 Glens Falls Post Star, February 2, 2000.

P. 10.10594 -Online News Article: EPA's Models Accepted, The
10.10595 Post Star, March 30, 2000.

P. 10.10596 -Online News Article: In War Over PCB's In Hudson,
10.10603 the EPA Nears Its Rubicon, The New York Times,
June 5, 2000.

P. 10.10604 -Article: Fishy Business Keeps Hudson Polluted,
10.10605 Financial Times, July 12, 2000.

P. 10.10606 -Online News Article: Court Rejects PCB Lawsuit,
10.10608 Times Union, September 26, 2000.

P. 10.10609 -Online News Article: Senate Clears Way For EPA
10.10610 Ruling On PCBs, Times Union, October 13, 2000.

P. 10.10611 -Newspaper Article: Support Builds For PCB Stance,
10.10612 Times Union, November 17, 2000, pp. Al, A16.

186


-------
P. 10.10613 -Newspaper Article: Pataki Administration Calls
10.10613 For Dredging of the Hudson River To Clean Up

PCB's, New York Times, November 17, 2000, p. B5.

P. 10.10614 -Online News Article: GE Lawsuit Challenges EPA,
10.10616 Times Union, November 29, 2000.

P. 10.10617 -Newspaper Article: Fight Just Beginning On Hudson
10.10617A Cleanup, New York Times, December 7, 2000, pp. Bl,
B5 .

P. 10.10618 -Newspaper Article: Dredging River's PCB's Could
10.10618 Be a Cure Worse Than the Disease, G.E. Insists,
New York Times, December 7, 2000, p. B5.

P. 10.10619 -Online News Article: GE Vows to Fight EPA

10.10620 Dredging Deal, Yahoo! News, Associated Press,
(www.dailynews.vahoo.com), December 7, 2000.

P. 10.10631 -News: GE Seeking Invalidation of Chemical Cleanup
	10.10632 Law, The Record, November 29, 2000, p. A6.

2001

P. 10.10633 -Online News Article: PCB report refrains from

	10.10635 recommendation, Times Union, by Ms. Dina

Cappiello, Staff Writer, January 4, 2001.

P. 10.10636 -Online News Article: Setting the record straight

	10.10637 about legality of G.E.'s PCB discharges,

www.hudsonwatch.net & .org/hudson-voice.com,
January 5, 2001.

P. 10.10638 -News: Attorney general, GE spar. Daily Freeman,

10.10638 January 16, 2001, p. A3.

P. 10.10639 -News: More time for response on PCBs, The Times

10.10640	Union, by Ms. Dina Cappiello, Staff Writer,

January 19, 2001, p. Bl.

P. 10.10641 -News: Hearings on PCB dredging resume. Daily

10.10641	Freeman, by Mr. Michael McCagg, Freeman Staff,
January 22, 2001, p.Al.

P. 10.10642 -News: Plavbook unveils GE plans to duck PCB

10.10642	cleanup bill. The Times Herald-Record, January 24,
2 0 01, p.4.

187


-------
P. 10.10643 -Online News Article: More sites make list for

	10.10645 sludge, Times Union, by Mr. Dennis Yusko, Staff

Writer, February 6, 2001.

P. 10.10646 -Online News Article: PCBs shelling Hudson's

	10.10647 turtles, Times Union, by Ms. Dina Cappiello, Staff

Writer, February 16, 2001.

P. 10.10648 -News: Turbulent Waters, Newsday, February 25,
10.10650 2001, pp. A7, A30, A31.

P. 10.10651 -News: PCB Dilemma, The Scientist, March 19, 2001.
10.10655

P. 10.10656 -Online News Article: Hudson labeled troubled

	10.10657 waters, Times Union, by Ms. Dina Cappiello, Staff

Writer, April 11, 2001.

P. 10.10658 -Online News Article: Labor groups back dredging,
10.10659 Times Union, by Ms. Dina Cappiello, Staff Writer,
April 13, 2001.

P. 10.10660 -Online News Article: PCB Worries Are Spreading

	10.10662 From Hudson to Its Shores, The New York Times,

April 17, 2001.

P. 10.10663 -Online News Article: A Hudson cleanup faces bitter

	10.10665 battle, The Boston Globe, By Mr. Darryl Campagna,

Globe Correspondent, April 22, 2001.

P. 10.10666 -Online News Article: Pataki pushes Hudson cleanup,
10.10667 www.timesunion.com, by Ms. Dina Cappiello, Staff
Writer, July 26, 2001.

P. 10.10668 -News: Whitman To Issue Order To Dredge Hudson For
	10.10668 PCB's, New York Times, August 1, 2001, pp. Al, B5.

P. 10.10669 -News: GE: No plans vet to fight EPA, The Journal

10.10670	News, August 2, 2001, pp. 1A, 6A.

P. 10.10671 -News: N.J, channel mud will patch Pa. mines. Home

10.10671	News Tribune, September 9, 2001.

P. 10.10672 -News: Attack Further Delays a Final Decision on

	10.10672 Hudson Dredging, The New York Times, September 22,

2001.

188


-------
P. 10.10673 -News: FAIR loses lawsuit to halt EPA's dredging,
10.10673 The Post-Star, September 22, 2001, pp. A3, A10.

P. 10.10674 -News: GE, EPA meeting raises concerns. Times
10.10674 Union, September 23, 2001, pp. El, E4.

P. 10.10675 -News: G.E. Is Accused of Trying to Undercut Order

	10.10677 to Dredge Hudson River, The New York Times,

October 1, 2001, p. F1.

P. 10.10678 -News: Environmentalists Oppose Shift on Hudson
	10.10679 Dredging, The New York Times, October 3, 2001.

P. 10.10680 -Online News Article: EPA weighs limits on
	10.10681 dredging, www.timesunion.com, October 3, 2001.

P. 10.10682 -Online News Article: Environmentalists meet with
	10.10683 EPA over dredging. The Post-Star, October 4, 2001.

P. 10.10684 -News: Letter to the Editor, from Mr. Constantine
10.10684 Sidamon-Eristoff, re: PCBs in the Hudson,

Environmentalists Oppose Shift on Hudson Dredging,
The New York Times, October 10, 2001.

P. 10.10685 -News: Residents, officials discuss PCB dredging
	10.10685 standards, Poughkeepsie Journal, October 24, 2001.

P. 10.10686 -News: DEC chief reiterates stance on dredging,

	10.10686 Albany - Letter follows meeting between EPA,

upriver residents, Albany Times Union, October 26,
2001.

P. 10.10687 -News: Fishing for life. Thousands of Americans

	10.10694 face the choice of eating contaminated fish or not

	eating at all. Sierra, by Mr. Paul Rauber,

November/December 2001, pp. 42 - 49.

10.2 Community Relations Plans

001-0137-0137 Letter to Lillian Johnson, U.S. EPA, from Albert
DiBernardo, TAMS Consultants, Inc., the enclosed
Community Relations Plan for the
Hudson River PCBs Reassessment Remedial
Investigation/Feasibility Study) by regarding
letter, December 6, 1990.

001-0138-0220 Plan: Community Relations Plan - Hudson River PCB
Reassessment RI/FS, prepared by TAMS Consultants,

189


-------
Inc., prepared for the U.S. EPA, Region II,
December 6, 1990.

001-0316-0317 Letter to Interested Parties from U.S. EPA re: the
Community Interaction Program and inviting
Citizens to join the Environmental Liaison Group,
January 8, 1991.

P. 10.6309 - Letter (w/attachment) to Ms. Carol Hemington,

10.6338 Technical Assistance Grant Coordinator, U.S. EPA,
Region II, from Mr. Joshua Cleland, Environmental
Associate, Scenic Hudson, Inc., re: Application
for Hudson River PCB Technical Assistance Grant,
June 23, 1995.

P. 10.6339 - Letter to Ms. Klara B. Sauer, Executive Director,
10.6345 Scenic Hudson, Inc., from Mr. William J.

Muszynski, Deputy Regional Administrator, for Ms.
Jeanne Fox, Regional Administrator, U.S. EPA,
Region II, re: Technical Assistance Grant - Hudson
River PCBs Site, October 6, 1995. (Attachment:
EPA Assistance Agreement/Amendment, September 2 9,
1995.)

P. 10.6441 - Plan: Revised Community Relations Plan for the

10.6554 Hudson River PCBs Reassessment RI/FS, prepared by
TAMS Consultants, Inc. for U.S. EPA, Region II,
August 1992.

- Summary of Community Interaction Program for the
Hudson River PCBs Site Reassessment posted on U.S.
EPA, Region II's Hudson River PCBs website at:
chttp://www.epa.gov/region02/superfnd/hudson/
public-participation.htm> (page last updated on
December 15, 2000.)

P. 10.10695 -Declaration (w/attachments) of Ms. Ann C.

10.10740 Rychlenski, Community Involvement Coordinator,
U.S. EPA, Region II, in United States District
Court, Northern District of New York, Farmers
Against Irresponsible Remediation (FAIR), by its
President, Charles Hanehan, Willard H. Peck,

Steven P. Griffen, Thomas Kugler, Sean Quinn,
Plaintiffs, against United States Environmental
Protection Agency and Christine Todd Whitman,
Administrator of the United States Environmental
Protection Agency, Defendants, Civil Action No.
01-CV-1183 (LEK-DEP) , August 20, 2001.

P. 10.6555
10.6557

190


-------
10.3 Public Notices

001-0413-0414 Letter to Liaison Group Members and Interested
Parties from Ann Rychlenski, U.S. EPA, re:
announcement for meeting to be held on July 16,
1991, of the Liaison Groups formed under the
Community Interaction Program for the Hudson River
PCBs Reassessment Project, June 20, 1991.

001-0418-0421 Memorandum to Scientific and Technical Committee
from Douglas J. Tomchuk, U.S. EPA, re:
announcement of a July 11, 1991 meeting of the
Scientific and Technical Committee as necessary
before proceeding with the work proposed in the
Phase 2A Sampling Plan, June 27, 1991.

001-0432-0433 Memorandum to Scientific and Technical Committee
from Douglas J. Tomchuk, U.S. EPA, re:
announcement of August 12, 1991 meeting of the
Scientific and Technical Committee to continue
discussions on the Phase 2A Sampling Plan, July
31, 1991.

001-1274-1274 Public Notice: Public Availability and Phone-in
Session Regarding the Phase I Report for the
Hudson River PCBs Site Reassessment on September
5, 1991 by U.S. EPA.

001-1275-1275 Public Notice: Announcement that EPA will be

holding two public meetings on the Phase I Report
for the Hudson River PCBs Reassessment on
September 11 and 12, 1991.

P. 10.2340 - Letter to All Interested Parties, from Mr.

10.2342 RichardL. Caspe, Director, Emergency and Remedial
Response Division, U.S. EPA, Region II, re: Report
of the Hudson River PCBs Site Modeling Approach
Peer Review, January 7, 1999.

Letter (w/attachments) to All Interested Parties,
from Ms. Alison A. Hess, Project Manager, Hudson
River PCBs Site, U.S. EPA, Region II, re: Peer
Review 4, January 31, 2000.

P. 10.2354 - Letter to All Interested Parties, from Mr. Richard
10.2354 L. Caspe, Director, Emergency and Remedial

Response Division, U.S. EPA, Region II, re: Report
on the peer review of the Revised Baseline

P. 10.2343 -
10 .2353

191


-------
Modeling report for the Hudson River PCBs
Superfund site, June 8, 2000.

P. 10.2355 - Letter to All Interested Parties, from Mr. Richard

10.2355 L. Caspe, Director, Emergency and Remedial

Response Division, U.S. EPA, Region II, re: Report
on the Peer Review of the Hudson River PCBs Human
Health Risk Assessment and the report on the Peer
Review of the Ecological Risk Assessment for the
Hudson River PCBs Superfund site, September 28,
2000 .

P. 10.2356 - Notice: Hudson River PCBs Site Reassessment RI/FS

	10.2357 Peer Review, prepared by U.S. EPA., Region II,

undated.

P. 10.2881 - Memorandum to Hudson River PCBs Administrative

10.2915 Record File, Superfund Records Center, U.S. EPA,
Region II, from Ms. Paulette Denny for Ms. Karen
Coghlan, Senior Community Affairs Specialist, re:
Hudson River PCBs Reassessment Public
Announcements for Public Meetings, May 17, 2001.
(Attachments: Notices: Hudson River PCBs
Reassessment Project prepared by U.S. EPA., Region
II.)

P. 10.3571 - Letter to Mr. John G. Haggard, Hudson River PCBs

10.3579	Project, General Electric Company, from Ms. Alison
A. Hess, C.P.G., Project Manager, U.S. EPA, Region
II, re: Hudson River PCBs Reassessment RI/FS,
September 8, 2000. (Attachment: Memorandum to
Directors, U.S. EPA, from Mr. Stephen D. Luftig,
Director, Office of Emergency and Remedial
Response, U.S. EPA, re: National Remedy Review
Board, September 26, 1996.)

P. 10.3580 - Letter to Mr. Rich Schiafo, Scenic Hudson Inc.,

10.3580	from Ms. Alison A. Hess, C.P.G., Project Manager,
U.S. EPA, Region II, re: Hudson River PCBs
Reassessment RI/FS, September 8, 2000.

P. 10.3581 - Letter to Mr. Bill Ports, New York State

10.3581	Department of Environmental Conservation, from Ms.
Alison A. Hess, C.P.G., Project Manager, U.S. EPA,
Region II, re: Hudson River PCBs Reassessment
RI/FS, September 8, 2000.

192


-------
P. 10.3582 - Letter to Mr. Thomas A. Borden, Chair,

10.3583 Agricultural Liaison Group, Washington County Farm
Bureau, Ms. Judy Schmidt Dean, Chair, Citizen
Liaison Group, Mr. Darryl L. Decker, Chair,
Governmental Liaison Group, and Mr. John
Santacrose, Chair, Environmental Liaison Group,
from Ms. Alison A. Hess, C.P.G., Project Manager,
U.S. EPA, Region II, re: Hudson River PCBs
Reassessment RI/FS, September 8, 2000.

P. 10.3584 - Public Notice: Requesting comments regarding the
10.3599 New York District, U. S. Army Corps of Engineers'
receipt of a permit application for dredging the
Hudson River, prepared by Mr. Richard L. Tomer,
Acting Chief, Regulatory Branch, New York
District, U.S. Army Corps of Engineers, May 10,
2001. (Attachments: (1) Work Description, undated
(2) Plans of the dredging activity, undated.)

P. 10.6346 - Notices from Mr. William J. Muszynski, Deputy

10.6349 Regional Administrator, U.S. EPA, Region II, dated
September 1, 1998, re: Peer Review Meeting on the
Hudson River PCBs Reassessment RI/FS Phase 2
Report Entitled "Preliminary Model Calibration
Report (PMCR)", September 11, 1998.

Public Notice: Proposal by New York District Corps
of Engineers to re-issue a Regional General
Permit, prepared by U.S. Army Corps of Engineers,
New York District, February 10, 1999.

P. 10.6379 - Letter to All Interested Parties, from Mr. Douglas
10.6379 J. Tomchuk, Project Manager, Hudson River PCBs

Site, U.S. EPA, Region II, re: Peer Review of the
Baseline Modeling Report for the Hudson River PCBs
Site in January 2000, December 2, 1999.

P. 10.10741 -Notice of Public Meetings: Hudson River PCBs

10.10741	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, prepared by U.S. EPA, Region II, Daily
Freeman, December 4, 2000.

P. 10.10742 -Notice of Public Meetings: Hudson River PCBs

10.10742	Reassessment Project, EPA to hold two public
meetings on January 23, 2001 and January 31, 2001,
prepared by U.S. EPA, Region II, Village Voice,
January 23, 2001.

P. 10.6350 -
10.6378

193


-------
P. 10.11755 -Public Notice: Hudson River PCBs Reassessment
10.11755 Informational Meeting on Understanding the

Decision-Making Process, October 23, 2000 and
October 25, 2000, prepared by U.S. EPA, Region II.

Notice of Technical Assistance Grants

P. 10.6558 - Public Notice: EPA Receives Letter of Intent to

10.6558	Apply for a Technical Assistance Grant at the
Hudson River PCBs Superfund Site from Scenic
Hudson, Inc., Poughkeepsie Journal, May 3, 1995

P. 10.6559 - Public Notice: EPA Receives Letter of Intent to

10.6559	Apply for a Technical Assistance Grant at the
Hudson River PCBs Superfund Site from Scenic
Hudson, Inc., Times Union, May 3-4, 1995.

Notice of Public Meetings & Extension of Public Comment Period

P. 10.6560 - Notice of Public Meetings: Hudson River PCBs

10.6560	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from The Times Herald-Record, December 4,
2 0 0 0, p. 12.

P. 10.6561 - Notice of Public Meetings: Hudson River PCBs

10.6561	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from the Poughkeepsie Journal, December 4,
2000, p. 10A.

P. 10.6562 - Notice of Public Meetings: Hudson River PCBs

10.6562	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from The Daily Gazette, December 4, 2000, p.
B5 .

P. 10.6563 - Notice of Public Meetings: Hudson River PCBs

10.6563	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from The Daily Gazette, December 4, 2000, p.
B2 .

194


-------
P. 10.6564 - Notice of Public Meetings: Hudson River PCBs

10.6564	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from The Post-Star, Glens Falls, N.Y.,
December 4, 2000, p. A5.

P. 10.6565 - Notice of Public Meetings: Hudson River PCBs

10.6565	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from the Times Union, December 4, 2000, p.
B5 .

P. 10.6566 - Notice of Public Meetings: Hudson River PCBs

10.6566	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from The Saratogian, December 4, 2000, p.
10A.

P. 10.6567 - Notice of Public Meetings: Hudson River PCBs

10.6567	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from the Capital Region TU [Times Union],
December 7, 2000.

P. 10.6568 - Notice of Public Meetings: Hudson River PCBs

10.6568	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from The Poughkeepsie Beat, December 8,
2 0 0 0, p. 25.

P. 10.6569 - Notice of Public Meetings: Hudson River PCBs

10.6569	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from the Times Union, December 10, 2000, p.
G4 .

P. 10.6570 - Notice of Public Meetings: Hudson River PCBs

10.6570	Reassessment Project, EPA to hold two public
meetings on December 12, 2000 and December 14,
2000, from the Times Herald Record, December 13,
2000 .

p. 10.6571 - Notice of Public Meetings: Hudson River PCBs

10.6571	Reassessment Project, EPA to hold two public
meetings on January 23, 2001 and January 31, 2001,
from The Times Herald-Record, January 12, 2001. p.
20 .

195


-------
P. 10.6572 - Notice of Public Meetings: Hudson River PCBs

10.6572	Reassessment Project, EPA to hold two public
meetings on January 23, 2001 and January 31, 2001,
from the Daily Freeman, January 12, 2001, p. D5.

P. 10.6573 - Notice of Public Meetings: Hudson River PCBs

10.6573	Reassessment Project, EPA to hold two public
meetings on January 23, 2001 and January 31, 2001,
from Newsday, January 12, 2001.

P. 10.6574 - Notice of Public Meetings: Hudson River PCBs
10.6574 Reassessment Project, EPA to hold two public

meetings on January 23, 2001 and January 31, 2001,
from Poughkeepsie Journal, January 12, 2001, p.

3A.

P. 10.6575 - Notice of Public Meetings: Hudson River PCBs
10.6575 Reassessment Project, EPA to hold two public

meetings on January 23, 2001 and January 31, 2001,
from The New York Observer, January 15, 2001,
p. 7 .

P. 10.6576 - Notice of Public Meetings: Hudson River PCBs
10.6576 Reassessment Project, EPA to hold two public

meetings on January 23, 2001 and January 31, 2001,
from The New York Observer, January 15, 2001, p.

8 .

16. 10.6577 - Notice of Public Meetings: Hudson River PCBs
10.6577 Reassessment Project, EPA to hold two public

meetings on January 23, 2001 and January 31, 2001,
from Newsday, January 19, 2001.

P. 10.6578 - Notice of Public Meetings: Hudson River PCBs
10.6578 Reassessment Project, EPA to hold two public

meetings on January 23, 2001 and January 31, 2001,
from The New York Observer, January 22, 2001, p.
10 .

P. 10.6579 - Notice of Public Meetings: Hudson River PCBs

10.6579	Reassessment Project, EPA to hold two public
meetings on February 6, 2001 and February 2, 2001,
from The Daily Gazette, January 26, 2001, p. A2.

P. 10.6580 - Notice of Public Meetings: Hudson River PCBs

10.6580	Reassessment Project, EPA to hold two public
meetings on February 6, 2001 and February 7, 2001,

196


-------
from The Post-Star, Glens Falls, N.Y., January 26,
2 0 01, p. B5.

P. 10.6581 - Notice of Public Meetings: Hudson River PCBs

10.6581	Reassessment Project, EPA to hold two public
meetings on February 6, 2001 and February 7, 2001,
from the Times Union, January 26, 2001, p. A4 .

P. 10.6582 - Notice of Public Meetings: Hudson River PCBs

10.6582	Reassessment Project, EPA to hold two public
meetings on February 6, 2001 and February 7, 2001,
from the Times Union, January 28, 2001, p. B4.

P. 10.6583 - Notice of Extension of the Public Comment Period:

10.6583	Hudson River PCBs Reassessment Project, EPA will
give public an additional 60 days to submit
comments on the proposed plan, from the
Poughkeepsie Journal, January 29, 2001.

P. 10.6584 - Notice of Extension of the Public Comment Period:

10.6584	Hudson River PCBs Reassessment Project, EPA will
give public an additional 60 days to submit
comments on the proposed plan, from the Journal
News, January 31, 2001.

P. 10.6585 - Notice of Public Meetings: Hudson River PCBs

10.6585	Reassessment Project, EPA to hold two public
meetings on January 23, 2001 and January 31, 2001,
from the Village Voice, January 30, 2001, p. 45.

P. 10.6586 - Notice of Public Meetings: Hudson River PCBs

10.6586	Reassessment Project, EPA to hold two public
meetings on February 6, 2001 and February 7, 2001,
from the Capital Region TU [Times Union], February
1, 2001.

P. 10.6587 - Notice of Public Meeting: Government Meetings and

10.6587	Public Event: The U.S. Environmental Protection
Agency holds public comment session on its
proposal to dredge PCBs from the upper Hudson
River, Haverstraw Municipal Center, Haverstraw,
New York. Meeting on February 9, 2001. The Times
Union, February 9, 2001.

P. 10.6588 - Notice of Public Meetings: Hudson River PCBs

10.6588	Reassessment Project, EPA to hold a public meeting
on March 7, 2001 (Saddlebrook, New Jersey) from
The Record, February 20, 2001, p. A-2.

197


-------
P. 10.6589 - Notice of Public Meetings: Hudson River PCBs

10.6589	Reassessment Project, EPA to hold a public meeting
on March 7, 2001 (Saddlebrook, New Jersey) from
The Record, February 26, 2001, p. L-9.

P. 10.6590 - Notice of Public Meetings: Hudson River PCBs

10.6590	Reassessment Project, EPA to hold a public meeting
on March 7, 2001 (Saddlebrook, New Jersey) from
The Star-Ledger, March 1, 2001, p. 26.

P. 10.6591 - Notice of Public Meetings: Hudson River PCBs

10.6591	Reassessment Project, EPA to hold two public
meetings on April 4, 2001 and April 5, 2001, from
The Post-Star, March 21, 2001, p. A5.

P. 10.6592 - Notice of Public Meetings: Hudson River PCBs

10.6592	Reassessment Project, EPA to hold two public
meetings on April 4, 2001 and April 5, 2001, from
The Daily Gazette, March 21, 2001.

P. 10.6593 - Notice of Public Meetings: Hudson River PCBs

10.6593	Reassessment Project, EPA to hold two public
meetings on April 4, 2001 and April 5, 2001, from
The Record, March 21, 2001, p. A5.

P. 10.6594 - Notice of Public Meetings: Hudson River PCBs

10.6594	Reassessment Project, EPA to hold a public meeting
on April 2, 2001, Daily Freeman, March 21, 2001,

p. D5 .

P. 10.6595 - Notice of Public Meetings: Hudson River PCBs

10.6595	Reassessment Project, EPA to hold a public meeting
on April 2, 2001, from the Poughkeepsie Journal,
March 21, 2 0 01.

P. 10.6596 - Notice of Public Meetings: Hudson River PCBs

10.6596	Reassessment Project, EPA to hold a public meeting
on April 2, 2001, from the Poughkeepsie Journal,
March 27, 2001, p. 4B.

P. 10.6597 - Notice of Public Meetings: Hudson River PCBs

10.6597	Reassessment Project, EPA to hold a public meeting
on April 2, 2001, from The Times Herald-Record,
March 29, 2001.

198


-------
P. 10.6598 - Notice of Public Meetings: Hudson River PCBs

199


-------
10.6598 Reassessment Project, EPA to hold a public meeting
on April 2, 2001, from The Times Herald-Record,
March 31, 2001, p. 42.

10.4 Public Meeting Transcripts

001-0225-0225 Agenda for the December 13, 1990, Hudson River
PCBs site Public Meeting, prepared by U.S. EPA,
December 13, 1990.

001-0226-0226 Letter to Lillian Johnson, U.S. EPA, from Albert
DiBernardo, TAMS Consultants, Inc., forwarding
Public Meeting Summary for the Hudson River PCBs
Reassessment Remedial Investigation/Feasibility
Study), January 31, 1991.

001-0227-027 9 Public Meeting Summary - Hudson River PCB

Reassessment RI/FS, prepared by TAMS Consultants,
Inc., prepared for U.S. EPA, January 31, 1991.

001-127 6-1393 Transcript: Public Hearing to Consider Phase I
Report of the Hudson River PCB Reassessment,
prepared by Pauline E. Williman, court reporter,
prepared for U.S. EPA, September 12, 1991.

001-1417-1448 Transcript: Meeting of the Scientific and

Technical Committee, prepared by Pauline E.
Williman, court reporter, prepared for U.S. EPA,
July 11, 1991.

P. 10.2358 - Presentation: Statement of Mr. William McCabe,

	10.2368 Deputy Director, Emergency and Remedial Response

Division, U.S. EPA, Region II, before the New York
State Assembly Standing Committee on Environmental
Conservation, March 19, 1997.

P. 10.6380 - Report: Final Public Information Meeting Summary
10.6409 for the Hudson River PCBs Superfund Site Saratoga
and Washington Counties, New York Community
Relations, prepared by Alliance Technologies
Corporation, prepared for U.S. Environmental
Protection Agency, October 18, 1989.

P. 10.10743 -Transcript: New York State Assembly, Standing

10.10825 Committee on Environmental Conservation, Public
Hearing, PCB Contamination in the Hudson River,
prepared by Associated Reporters Int'l, Inc., July
9, 1998.

200


-------
Transcripts of Public Hearings on the Proposed Plan of December

2000

p. 10.6599 - Transcript: Transcript of a public hearing

10.6819 sponsored by U.S. EPA, Region II - In the Matter
of Hudson River PCBs Superfund Site: Remedial
Alternatives, Saratoga Springs, New York, December
12, 2000.

P. 10.6820 - Errata Sheets for Transcript of the Public Meeting
10.6867 of December 12, 2000.

p. 10.6868 - Transcript: Transcript of a public hearing

10.7026 sponsored by U.S. EPA, Region II - In the Matter
of Hudson River PCBs Superfund Site: Remedial
Alternatives, Poughkeepsie, New York, December 14,
2000 .

P. 10.7027 - Errata Sheets for Transcript of the Public Meeting
10.7053 of December 14, 2000.

P. 10.7054 - Transcript: Transcript of a public meeting on the
10.7226 Proposed Plan to Clean up the Hudson River PCBs
site, sponsored by U.S. EPA, Region II,
Poughkeepsie, New York, January 23, 2001.

P. 10.7227 - Errata Sheets for Transcript of the Public Meeting
10.7279 of January 23, 2001.

P. 10.7280 - Transcript: Transcript of a public meeting on the
10.7479 Proposed Plan to Clean up the Hudson River PCBs

site, sponsored by U.S. EPA, Region II, New York,
New York, January 31, 2001.

P. 10.7480 - Errata Sheets for Transcript of the Public
10.7535 Meeting of January 31, 2001.

P. 10.7536 - Transcript: Transcript of a public meeting on the
10.77 69 Proposed Plan to Clean up the Hudson River PCBs
site, sponsored by U.S. EPA, Region II, Albany,
New York, February 6, 2001.

P. 10.7770 - Errata Sheets for Transcript of the Public Meeting
10.7828 of February 6, 2001.

201


-------
P. 10.7829 - Transcript: Transcript of a public meeting on the
10.8084 Proposed Plan to Clean up the Hudson River PCBs
site, sponsored by U.S. EPA, Region II, Hudson
Falls, New York, February 7, 2001.

P. 10.8085 - Errata Sheets for Transcript of the Public Meeting
10.8116 of February 7, 2001.

P. 10.8117 - Transcript: Transcript of a public meeting on the
10.8219 Proposed Plan to Clean up the Hudson River PCBs
site, sponsored by U.S. EPA, Region II,

Haverstraw, New York, February 9, 2001.

P. 10.8220 - Errata Sheets for Transcript of the Public Meeting
10.8230 of February 9, 2001.

P. 10.8231 - Transcript: Transcript of a public meeting on the
10.8408 Proposed Plan to Clean up the Hudson River PCBs
site, sponsored by U.S. EPA, Region II, Saddle
Brook, New Jersey, March 7, 2001.

P. 10.8409 - Errata Sheets for Transcript of the Public Meeting
10.8422 of March 7, 2001.

P. 10.8423 - Transcript: Transcript of a public meeting on the
10.8621 Proposed Plan to Clean up the Hudson River PCBs

site, sponsored by U.S. EPA, Region II, Newburgh,
New York, April 2, 2001.

P. 10.8622 - Errata Sheets for Transcript of the Public Meeting
10.8657 of April 2, 2001.

P. 10.8658 - Transcript: Transcript of a public meeting on the
10.8843 Proposed Plan to Clean up the Hudson River PCBs
site, sponsored by U.S. EPA, Region II,

Queensbury, New York, April 4, 2001.

P. 10.8844 - Errata Sheets for Transcript of the Public Meeting
10.8860 of April 4, 2001.

P. 10.8861 - Transcript: Transcript of a public meeting on the
10.9066 Proposed Plan to Clean up the Hudson River PCBs

site, sponsored by U.S. EPA, Region II, Troy, New
York, April 5, 2001.

P. 10.9067 - Errata Sheets for Transcript of the Public Meeting
10.9113 of April 5, 2001.

202


-------
Public Statements

P. 10.9114 - Oral Statement Prepared for delivery before the

10.9118	Committee on Enviironmental Conservation, New York
State Assembly, Albany, New York, by Carol M.
Browner, Administrator, U.S. EPA, July 9, 1998.

P. 10.9119 - Statement of U.S. EPA Administrator Carol M.

10.9119	Browner on EPA Hudson River Study on PCB-
Contaminated Sediments, July 23, 1998.

P. 10.9120 - Remarks Prepared for Delivery by Carol M. Browner,
10.9122 Administrator, Enviromental Protection Agency,

Hudson River Dredging Announcement, New York, NY,
December 6, 2000.

10.5 Documentation of Other Public Meetings

P. 10.2369 - Letter to Reviewers, from Ms. Melanie Russo,
10.2572 Eastern Research Group (ERG), re: Recap of

informational meeting for Peer Review, February
15, 2000. (Attachment: Agenda: Informational
Meeting for the Peer Review of Hudson River PCBs
Baseline Modeling Report, prepared by Eastern
Research Group, Inc., prepared for U.S. EPA,

Region II, January 12-13, 2000.)

P. 10.2573 - Letter to Reviewers, from Ms. Melanie Russo,
10.2775 Eastern Research Group (ERG), re: Recap of

informational meeting for Peer Review, April 5,
2000. (Attachment: Agenda: Informational Meeting
for the Peer Review of Hudson River PCBs
Ecological & Human Health Risk Assessment,
prepared by Eastern Research Group, Inc., prepared
for U.S. EPA, Region II, March 22-23, 2000.)

P. 10.3600 - Memorandum to file, from Mr. Douglas J. Tomchuk,
10.3601 Remedial Project Manager, Emergency and Remedial
Response Division, U.S. EPA, Region II, re: April
20, 2001 Conference Call Between EPA and
Representatives of the National Academy of
Sciences Concerning the National Research Council
Report on PCB-Contaminated Sediments, May 2, 2001.

203


-------
P. 10.3602 - Memorandum for The Record, from Ms. Dona deLeon,

10.3603	Deputy Associate Administrator for Policy,
Economics and Innovation, U.S. EPA, re: Dredging
PCBs from the Hudson, May 4, 2001. (Attachment:
CEASE points.)

P. 10.3604 - Memorandum to The Record, from Ms. Dona deLeon,

10.3604	re: Hudson River PCB Dredging, May 15, 2001.

P. 10.6410 - Letter to Mr. Constantine Sidamon-Eristoff,

10.6410	Regional Administrator, U.S. EPA, Region II, from
Mr. Langdon Marsh, Executive Deputy Commissioner,
New York State Department of Environmental
Conservation, re: Request for the replacement of
Dr. Daniel A. Abramowicz as Chairperson of the
Hudson River PCB Science and Technical Committee,
February 10, 1992.

P. 10.6411 - Letter to Mr. Langdon Marsh, Executive Deputy

10.6411	Commissioner, New York State Department of
Environmental Conservation, from Mr. Constantine
Sidamon-Eristoff, Regional Administrator, U.S.
EPA, Region II, re: Response to request for the
replacement of Dr. Daniel A. Abramowicz as
Chairperson of the Hudson River PCB Science and
Technical Committee, March 20, 1992.

P. 10.6412 - Meeting Hudson River Briefing, presented to U.S.

10.6440 EPA, Region II on June 2, 2000.

P. 10.10485 -E-mail (w/attachment) to Mr. Douglas Fischer, Mr.

10.10486 Earl Salo, and Mr. Barry Breen, U.S. EPA, from Ms.

Phyllis Anderson, U.S. EPA, Region II, re: Summary
of CEASE and FAIR meeting for administrative
record, June 14, 2001.

P. 10.10487 -E-mail (w/attachment) to Mr. Douglas Fischer,

10.10488	U.S. EPA, Region II, from Mr. Randy Deitz, U.S.
EPA, Region II, re: Hudson Meeting, July 24, 2001.

P. 10.10489 -Forwarded e-mail to Mr. Douglas Fischer, U.S.

10.10489	EPA, Region II, from Mr. Paul Simon, U.S. EPA,
Region II, re: Meeting on Hudson River with Farm
Bureau, August 3, 2001.

P. 10.10498 -Report: Superfund, Information Regarding EPA's 1

	10.10532 Cleanup Decision Process on the Hudson River Site,

prepared by United States General Accounting

204


-------
Office, prepared for Congressional Requesters,
September 2000.

P. 10.10826 -Memorandum to Hudson River ROD Docket, from Ms.
10.10828 Eileen McGinnis, U.S. EPA, re: Hudson River,
September 19, 2001.

P. 10.10829 -Letter to Honorable Christine Todd Whitman,

10.10833 Administrator, U.S. EPA, from Friends of a Clean
Hudson, re: Concerns about any attempt to include
specific or numeric performance standards in the
Hudson River Superfund Site's ROD, October 12,
2001.

P. 10.11756 -Agenda: Agenda, Hudson River PCBs Reassessment
10.11756 Project, Public Meeting on the Proposed Plan to

Clean up the Hudson River PCBs Site, Poughkeepsie,
NY, January 23, 2001.

Hudson River Oversight Committee

P. 10.9123 - Minutes: Minutes of the Meeting of the Hudson

10.9131 River PCBs Oversight Committee, with attachments,
April 4, 1991 (Poughkeepsie, New York).

P. 10.9132 - Minutes: Minutes of the Meeting of the Hudson
10.9140 River PCBs Oversight Committee, May 15, 1991
(Albany, New York).

P. 10.9141 - Minutes: Minutes of the Meeting of the Hudson

10.9147 River PCBs Oversight Committee, with attachments,
October 22, 1991 (Poughkeepsie, New York).

P. 10.9148 - Minutes: Minutes of the Meeting of the Hudson

10.9194 River PCBs Oversight Committee, with attachments,
January 21, 1992 (Poughkeepsie, New York).

P. 10.9195 - Minutes: Minutes of the Meeting of the Hudson

10.9208 River PCBs Oversight Committee, with attachments,
September 1, 1992 (Albany, New York).

P. 10.9209 - Minutes: Minutes of the Meeting of the Hudson

10.9240 River PCBs Oversight Committee, with attachments,
October 20, 1993 (New Paltz, New York).

P. 10.9241 - Minutes: Minutes of the Meeting of the Hudson

10.9254 River PCBs Oversight Committee, October 8, 1997
(Latham, New York).

205


-------
10.9255 - Minutes: Minutes of the Meeting of the Hudson
10.927 6 River PCBs Oversight Committee, with attachments,
July 15, 1998 (Kingston, New York).

10.9277 - Minutes: Minutes of the Meeting of the Hudson

10.9311	River PCBs Oversight Committee, with attachments,
January 26, 1999 (Saratoga Springs, New York).

10.9312	- Minutes: Minutes of the Meeting of the Hudson

10.9325	River PCBs Oversight Committee, with attachments,
July 21, 1999 (Poughkeepsie, New York).

10.9326	- Minutes: Minutes of the Meeting of the Hudson
10.9397 River PCBs Oversight Committee, with attachments,

March 8, 2000 (Saratoga Springs, New York).

10.10834 -Agenda: Agenda, Hudson River PCBs Superfund Site,
10.10836 Reassessment RI/FS, Oversight Committee,
Poughkeepsie, New York, April 4, 1991.
(Attachment: Sign-in sheet from Hudson River PCB
Oversight Committee, April 4, 1991.)

p. 10

	 10837 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.10837 Reassessment RI/FS, Joint Meeting of the Hudson

Reassessment RI/FS, Joint Meeting of the Hudson
River Oversight Committee, The Steering Committee
and the Scientific and Technical Committee,

Al	"KTotat YnrV M;=i\7 IS 1 QQ1

Albany, New York, May 15, 1991.

p. 10.10838 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.10838 Reassessment RI/FS, Joint Meeting of the Hudson

River Oversight Committee, Poughkeepsie, New York,
October 22, 1991.

P. 10.10839 -Agenda: Agenda, Hudson River Oversight Committee

10.10841	Meeting, Poughkeepsie, New York, January 21, 1992.

(Attachment: Sign-in sheet from Hudson River PCB
Reassessment RI/FS, Community Interaction Program,
Hudson River PCB Oversight Committee Meeting,
January 21, 1992.)

P. 10.10842 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.10842	Reassessment RI/FS, Hudson River PCBs Oversight
Committee, Albany, New York, September 1, 1992.

P. 10.10843
	10.10880

-Agenda: Agenda (w/attachments) Hudson River PCBs
Site, Reassessment RI/FS, Hudson River PCB
Oversight Committee, New Paltz, New York, October
20, 1993.

206


-------
p.

10.10881 -Agenda: Agenda (w/attachments) Hudson River PCBs
.10.10913 Site, Reassessment RI/FS, Oversight Committee,
Latham, New York, October 8, 1997.

P. 10.10914 -Agenda: Agenda, Hudson River PCBs Site,
10.10914 Reassessment RI/FS, Oversight Committee,
New York, January 21, 1998.

Latham,

P. 10.10915 -Agenda: Agenda, Hudson River PCBs Site,
10.10915 Reassessment RI/FS, Oversight Committee,
New York, July 15, 1998.

Kingston,

P. 10.10916 -Agenda: Agenda, Hudson River PCBs Site,
10.10916 Reassessment RI/FS, Oversight Committee,
Springs, New York, January 26, 1999.

Saratoga

P. 10.10917 -Agenda: Agenda (w/attachments), Hudson River PCBs,
10.10972 Oversight Committee, Saratoga Springs, New York,
March 8, 2 0 0 0.

Liaison Groups

P. 10.9398 - Minutes: Minutes of	the Meeting of the Joint

10.9405 Liaison Group, with	attachments, July 16, 1991
(Latham, New York).

P. 10.9406 - Minutes: Minutes of	the Meeting of the Joint

10.9436 Liaison Group, with	attachments, February 27, 1992
(Saratoga Springs, New York).

P. 10.9437 - Minutes: Minutes of	the Meeting of the Joint

10.9448 Liaison Group, June	18, 1992 (Hudson, New York).

P. 10.9449 - Minutes: Minutes of	the Meeting of the Joint

10.9486 Liaison Group, with	attachments, November 5, 1992,
(Latham, New York).

P. 10.9487 - Minutes: Minutes of	the Meeting of the Joint

10.9499 Liaison Group, with	attachments, March 31, 1993
(Latham, New York).

P. 10.9500 - Minutes: Minutes of	the Meeting of the Joint

10.9539 Liaison Group, with	attachments, November 22, 1993
(Latham, New York).

P. 10.9540 - Minutes: Minutes of the Meeting of the Joint

10.9574 Liaison Group, with attachments, October 18, 1995
(Albany, New York).

207


-------
P. 10.9575 - Minutes: Minutes of the Meeting of the Joint

10.9624 Liaison Group, with attachments, February 19, 1997
(Albany, New York).

P. 10.9625 - Minutes: Minutes of the Meeting of the Joint

10.9657 Liaison Group, with attachments, July 23, 1998
(Albany, New York).

P. 10.9658 - Minutes: Minutes of the Meeting of the Joint

10.9694 Liaison Group, with attachments, September 23,
1998 (Latham, New York).

P. 10.9695 - Minutes: Minutes of the Meeting of the Joint
10.9730 Liaison Group, with attachments, May 18, 1999
(Albany, New York).

P. 10.9731 - Minutes: Minutes of the Meeting of the Joint

10.9791 Liaison Group, with attachments, August 4, 1999

(Albany, New York), August 5, 1999 (Poughkeepsie,
New York).

P. 10.9792 - Minutes: Minutes of the Meeting of the Joint

10.9843 Liaison Group, with attachments, January 11, 2000
(Poughkeepsie, New York).

P. 10.10973 -Sign-in sheet from the Governmental Liaison Group
10.10974 Meeting, February 11, 1991.

P. 10.10975 -Sign-in sheet from the Environmental Liaison Group
10.10976 Meeting, February 12, 1991.

P. 10.10977 -Sign-in sheet from the Citizen Liaison Group
10.10979 Meeting, February 13, 1991.

P. 10.10980 -Sign-in sheet from the Agricultural Liaison Group

10.10981	Meeting, February 14, 1991.

P. 10.10982 -Agenda: Agenda, Hudson River PCBs Reassessment

10.10982	Environmental Liaison Group Meeting, Selkirk, New
York, April 3, 1991.

P. 10.10983 -Agenda: Agenda, Hudson River PCB Reassessment,
10.10989 Community Interaction Program, Liaison Group
Meeting, Latham, New York, July 16, 1991.
(Attachment: Sign-in sheet for Hudson River PCB
Reassessment Community Interaction Program, Joint
Liaison Group Meeting, July 16, 1991.

208


-------
P. 10.10990 -Agenda: Agenda, Hudson River PCBs Superfund Site

10.10990 Reassessment, Community Interaction Program, Joint
Liaison Group Meeting, Saratoga Springs, New York,
February 27, 1992.

P. 10.10991 -Notice: Hudson River PCB Reassessment, RI/FS,

10.10995 Community Interaction Program, Joint Liaison Group
Meeting, Hudson, New York, June 18, 1992.
(Attachment: Sign-in sheet for Hudson River PCB
Reassessment RI/FS, Community Interaction Program,
Joint Liaison Group Meeting, June 18, 1992.)

P. 10.10996 -Agenda: Agenda, Hudson River PCB Reassessment,

10.11027	RI/FS, Community Interaction Program, Joint
Liaison Group Meeting, Hudson, New York, June 18,
1992. (Attachment: Minutes: Hudson River PCBs
Reassessment RI/FS, Community Interaction Program,
Phase 2 Work Plan meeting minutes, June 18, 1992.)

P. 10.11028 -Agenda: Agenda, Hudson River PCBs Superfund Site

10.11028	Reassessment RI/FS, Joint Liaison Group Meeting,
Latham, New York, November 5, 1992

P. 10.11029 -Agenda: Agenda, Hudson River PCB Reassessment,

10.11029	Community Interaction Program, Joint Liaison Group
Meeting, Latham, New York, March 31, 1993.

P. 10.11030 -Minutes: Minutes (w/attachments) from Hudson River

10.11042	PCBs Reassessment RI/FS, Community Interaction
Program, Joint Liaison Group Meeting, Latham, New
York, March 31, 1993.

P. 10.11043 -Agenda: Agenda, Hudson River PCB Reassessment,

10.11043	Community Interaction Program, Joint Liaison Group
Meeting, Latham, New York, November 22, 1993.

P. 10.11044 -Public Meeting: Agenda, Hudson River

	10.11044 PCBs Reassessment RI/FS, Community Interaction

Program, Joint Liaison Group Meeting, Latham, New
York, April 18, 1994.

P. 10.11045 -Agenda: Agenda, Hudson River PCBs Reassessment,

10.11045 Community Interaction Program, Joint Liaison Group
Meeting, Albany, New York, October 18, 1995.

209


-------
10.11046 -Agenda: Agenda (w/attachments), Hudson River PCBs

10.11093	Reassessment RI/FS, Community Interaction Program,
Joint Liaison Group Meeting, Latham, New York,
December 11, 1995.

10.11094	-Minutes: Minutes (w/attachments) from Hudson River

10.11145	PCBs Reassessment Remedial
Investigation/Feasibility Study (RRI/FS),

Community Interaction Program, Joint Liaison Group
Meeting, Latham, New York, December 11, 1995.

10.11146	-Agenda: Agenda (w/attachments), Hudson River PCBs

10.11168	Reassessment Community Interaction Program, Joint
Liaison Group Meeting, Albany, New York, October
28, 1996.

10.11169	-Agenda: Agenda, U.S. EPA Hudson River PCBs
10.11169 Reassessment, Community Interaction Program, Joint

Liaison Group Meeting, Phase 2 Data Evaluation and
Interpretation Report, Albany, New York, February
19, 1997

P. 10.11170
10.11170

¦Agenda: Agenda, Hudson River PCBs Reassessment,
Community Interaction Program, Joint Liaison Group
Meeting, Latham, New York, September 23, 1998.

10.11171 -Agenda: Agenda, U.S. EPA Hudson River PCBs

10.11171	Reassessment, Community Interaction Program, Phase
2 Baseline Modeling Report, Joint Liaison Group
Meeting, Albany, New York, May 18, 1999.

10.11172	-Agenda: Agenda, Hudson River PCBs Reassessment,

10.11172	Joint Liaison Group Meeting, Human Health Risk
Assessment Report and Ecological Risk Assessment
Report, Albany, New York, August 4, 1999.

10.11173	-Agenda: Agenda, Hudson River PCBs Reassessment,
10.11173 Joint Liaison Group Meeting, Human Health Risk

Assessment Report and Ecological Risk Assessment
Report, Poughkeepsie, New York, August 5, 1999.

Scientific and Technical Committee

P. 10.9844 - Minutes: Minutes of the Meeting of the Scientific
10.9846 and Technical Committee, April 2, 1991 (Latham,
New York).

210


-------
P. 10.9847 - Minutes: Minutes of the Meeting of the Scientific
10.9855 and Technical Committee, May 15, 1991 (Albany, New
York) .

P. 10.9856 - Minutes: Minutes of the Meeting of the Scientific
10.9860 and Technical Committee, July 11, 1991 (Latham,
New York).

P. 10.9861 - Minutes: Minutes of the Meeting of the Scientific
10.9874 and Technical Committee, August 12, 1991 (Latham,
New York).

P. 10.9875 - Meeting Notes: Recommendations of the Scientific
10.9877 and Technical Committee, from the meeting of July
10, 1992, by William J. Nicholson, Mount Sinai
School of Medicine.

P. 10.9878 - Minutes: Minutes of the Meeting of the Scientific
10.9889 and Technical Committee, with attachments, May 27,

1993,	(Albany, New York).

P. 10.9890 - Minutes: Minutes of the Meeting of the Scientific
10.9898 and Technical Committee, with agenda, October 19,
1993 (Albany, New York).

P. 10.9899 - Minutes: Minutes of the Meeting of the Scientific
10.9910 and Technical Committee, with agenda, March 24,

1994,	(Latham, New York).

P. 10.9911 - Minutes: Minutes of the Meeting of the Scientific
10.10024 and Technical Committee, with attachments, August
18, 1998 (Albany, New York).

P. 10.11174 -Letter to Members of the Scientific and Technical
10.11175 Committee, from Ms. Kathleen C. Callahan,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Scientific and
Technical Committee function, March 27, 1991.

P. 10.11176 -Agenda: Agenda, Scientific and Technical

10.11177 Committee, Hudson River PCBs Superfund Site,

Reassessment RI/FS, Latham, New York, April 2,
1991. (Attachment: Sign-in sheet for Scientific
and Technical Committee, Hudson River PCBs
Superfund Site, Reassessment RI/FS, meeting, April
2, 1991.)

211


-------
P. 10.11178 -Agenda: Agenda, Scientific and Technical

10.11178	Committee, Hudson River PCBs Superfund Site,
Reassessment RI/FS, Joint Meeting of the Hudson
River PCB Oversight Committee, The Steering
Committee and The Scientific and Technical
Committee, Albany, New York, May 15, 1991.

P. 10.11179 -Agenda: Agenda, Hudson River PCBs Site,

10.11179	Reassessment RI/FS, Scientific and Technical
Committee, Latham, New York, August 12, 1991.

P. 10.11180 -Notice: Notice that no minutes were issued for the

10.11180	Hudson River PCB Reassessment RI/FS, Community
Interaction Program, Scientific and Technical
Committee Meeting, Albany, New York, September 24,
1991.

P. 10.11181 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.11183 Reassessment RI/FS, Scientific and Technical
Committee, Latham, New York, July 10, 1992.
(Attachment: Sign-in sheet for Scientific and
Technical Committee, Hudson River PCBs Superfund
Site, Reassessment RI/FS, meeting, July 10, 1992.)

P. 10.11184 -Minutes: Minutes, Hudson River PCB Reassessment,

10.11188	Community Interaction Program, Scientific and
Technical Committee, Latham, New York, July 10,
1992 .

P. 10.11189 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.11189	Reassessment RI/FS, Scientific and Technical
Committee, Albany, New York, May 27, 1993.

P. 10.11190 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.11190	Reassessment RI/FS, Scientific and Technical
Committee, Latham, New York, October 19, 1993.

P. 10.11191 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.11191	Reassessment RI/FS, Scientific and Technical
Committee, Latham, New York, February 9, 1994.

P. 10.11192 -Agenda: Agenda, Hudson River PCBs Superfund Site,

10.11194 Reassessment RI/FS, Scientific and Technical
Committee, Latham, New York, March 24, 1994.
(Attachment: Sign-in sheet for Scientific and
Technical Committee, Hudson River PCBs Superfund
Site, Reassessment RI/FS, meeting, March 24,

1994.)

212


-------
10.11195	-Agenda: Agenda, Hudson River PCBs Site,

10.11196	Reassessment RI/FS, Scientific and Technical
Committee, Latham, New York, March 25, 1997.
(Attachment: Sign-in sheet for Scientific and
Technical Committee, Hudson River PCBs Site,
Reassessment RI/FS, meeting, March 25, 1997.)

10.11197	-Agenda: Agenda, Hudson River PCBs Site,

10.11198	Reassessment RI/FS, Scientific and Technical
Committee, Latham, New York, March 26, 1997.
(Attachment: Sign-in sheet for Scientific and
Technical Committee, Hudson River PCBs Site,
Reassessment RI/FS, meeting, March 26, 1997.)

10.11199	-Agenda: Agenda, Hudson River PCBs Site,

10.11201	Reassessment RI/FS, Scientific and Technical
Committee, Albany, New York, August 18, 1998.
(Attachment: Sign-in sheet for Scientific and
Technical Committee, Hudson River PCBs Site,
Reassessment RI/FS, meeting, August 18, 1998.)

10.11202	-Agenda: Agenda, Hudson River PCBs Site,

10.11204	Reassessment RI/FS, Scientific and Technical
Committee, Albany, New York, June 16, 1999.
(Attachment: Sign-in sheet for Scientific and
Technical Committee, Hudson River PCBs Site,
Reassessment RI/FS, meeting, June 16, 1999.)

10.11205	-Agenda: Agenda, Hudson River PCBs Site,
10.11207 Reassessment RI/FS, Scientific and Technical

Committee, Albany, New York, September 16, 199
(Attachment: Sign-in sheet for Scientific and
Technical Committee, Hudson River PCBs Site,
Reassessment RI/FS, meeting, September 16, 199

Steering Committee

P. 10.10025 - Minutes: Minutes of the Meeting of the Steering
10.10031 Committee, March 12, 1991 (Albany, New York).

P. 10.10032 - Minutes: Minutes of the Meeting of the Steering
10.10040 Committee, HROC and the STC, May 15, 1991
(Albany, New York).

P. 10.10041 - Minutes: Minutes of the Meeting of the Steering
10.10070 Committee Meeting, with attachments, January 8,
1992 (Latham, New York).

213


-------
P. 10.10071 - Minutes: Minutes of the Meeting of the Steering
10.10076 Committee Meeting, with attachments, August 5,
1992 (Glen Falls, New York).

P. 10.10077 - Minutes: Minutes of the Meeting of the Steering

10.10083 Committee Meeting, with attachments, September 1,

1992	(Albany, New York).

P. 10.10084 - Minutes: Minutes of the Meeting of the Steering
10.10110 Committee Meeting, with attachments, July 14,

1993	(Latham, New York).

P. 10.10111 - Minutes: Minutes of the Meeting of the Steering
10.10113 Committee Meeting, September 24, 1997 (Latham,
New York).

P. 10.10114 - Minutes: Minutes of the Meeting of the Steering
10.10153 Committee Meeting, with attachments, October 19,

1998	(Saratoga Springs, New York).

P. 10.10154 - Minutes: Minutes of the Meeting of the Steering
10.10167 Committee Meeting, with attachments, April 12,

1999	(Saratoga Springs, New York).

P. 10.10168 - Minutes: Minutes of the Meeting of the Steering
10.10204 Committee Meeting, with attachments, October 26,

1999	(Saratoga Springs, New York).

P. 10.10205 - Minutes: Minutes of the Meeting of the Steering
10.10220 Committee Meeting, with attachments, June 21,

2000	(Latham, New York).

P. 10.11208 -Agenda: Agenda, Hudson River PCB Reassessment,

10.11209	Community Interaction Program, Steering Committee
Meeting, Albany, New York, March 12, 1991.
(Attachment: Sign-in sheet for Hudson River PCB
Reassessment, Community Interaction Program,
Steering Committee Meeting, March 12, 1991.)

P. 10.11210 -Agenda: Agenda, Hudson River PCB Reassessment,

10.11210	Community Interaction Program, Steering Committee
Meeting, Saugerties, New York, October 16, 1991.

P. 10.11211 -Notice: Notice that no minutes were issued for the

10.11211	Hudson River PCB Reassessment, RI/FS, Community
Interaction Program, Steering Committee Meeting,
Saugerties, New York, October 16, 1991.

214


-------
P. 10.11212 -Agenda: Agenda, Hudson River PCBs Superfund Site

10.11215 Reassessment, Community Interaction Program,
Steering Committee Meeting, Latham, New York,
January 8, 1992.

P. 10.11216 -Agenda: Agenda, Hudson River PCBs Reassessment

10.11218	RI/FS, Community Interaction Program, Steering
Committee Meeting, Glens Falls, New York, August
5, 1992. (Attachment: Sign-in sheet for Hudson
River PCBs Reassessment RI/FS, Community
Interaction Program, Steering Committee Meeting,
August 5, 1992.)

P. 10.11219 -Agenda: Agenda, Hudson River PCB Reassessment

10.11219	RI/FS, Community Interaction Program, Steering
Committee Meeting, Saratoga Springs, New York,

July 14, 1993.

P. 10.11220 -Agenda: Agenda, Hudson River PCB Reassessment,

10.11220	Community Interaction Program, Steering Committee
Meeting, Latham, New York, September 24, 1997.

P. 10.11221 -News: Change of Location for Hudson River PCB

10.11221	Steering Committee Meeting, April 22, 1998.

P. 10.11222 -Agenda: Agenda, U.S. EPA Hudson River PCBs

10.11222	Reassessment, Community Interaction Program,
Steering Committee Meeting, Glens Falls, New York,
April 27, 1998.

P. 10.11223 -Agenda: Agenda, Hudson River PCBs Reassessment,

10.11223	Community Interaction Program, Steering Committee
Meeting, Saratoga Springs, New York, October 19,
1998 .

P. 10.11224 -Agenda: Agenda, Hudson River PCBs Reassessment,

10.11224	Community Interaction Program, Steering Committee
Meeting, Saratoga Springs, April 12, 1999.

P. 10.11225 -Agenda: Agenda, Hudson River PCBs Reassessment,

10.11225	Community Interaction Program, Steering Committee
Meeting, Saratoga Springs, New York, October 26,
1999.

P. 10.11226 -Agenda: Agenda, U.S. EPA Hudson River PCBs

10.11226	Reassessment, Community Interaction Program,
Steering Committee Meeting, Latham, New York, June
21, 2000.

215


-------
10.6 Fact Sheets and Press Releases

001-0105-0107 Press Release: EPA will assess Hudson River PCBs
under Superfund, prepared by U.S. EPA, December
20, 1989.

001-0221-0222 Press Release: EPA to hold a Public Meeting in

Saratoga Springs, New York on the Reassessment of
the Hudson River PCB Superfund Site, prepared by
U.S. EPA, December 3, 1990.

001-0350-0353 Fact Sheet: Superfund Update; Hudson River PCBs

Reassessment RI/FS, prepared by U.S. EPA, February

I,	1991.

001-0434-0437 Fact Sheet: Hudson River PCB Site-Reassessment

RI/FS proposed sampling plan fact sheet, prepared
by TAMs Consultants, Inc., prepared for U.S. EPA,
1991.

P. 10.2776 - Press Release: EPA Announces Experts Selected to

	10.277 8 Peer Review Computer Model Used for the Hudson

River PCB Superfund Site, July 1, 1998.

P. 10.2779 - Press Release: Panel for Third Round of Peer

	10.2780 Review for Hudson River PCBs Announced by EPA,

prepared by Ms. Ann Rychlenski, U.S. EPA, Region

II,	January 11, 2000.

P. 10.2916 - Press Release: Remarks by the President, Secretary

	10.2919 of State Colin Powell, and EPA Administrator

Christine Todd Whitman In Environmental
Announcement, prepared by The White House, Office
of the Press Secretary,

www.whitehouse.gov/news/release, April 19, 2001;
printed April 23, 2001.

P. 10.10259 - News Release: EPA to Hold Two Public Meetings to
10.10261 Discuss the Phase 1 Report for the Hudson River
PCB Superfund Site Reassessment, September 3,
1991.

P. 10.10262 - News Release: EPA Hosts Sediment Coring

	10.10264 Demonstration on the Hudson River in Ft. Edward,

	 New York, October 13, 1992.

216


-------
P. 10.10265 - News Release: Change in Information Repository

	10.10266 Locations for Hudson River PCBs Reassessment

Documents, January 20, 1995.

P. 10.10267 - News Release: EPA Releases Phase 2 Data

10.10269	 Evaluation and Interpretation Report for the

Hudson River PCB Reassessment, February 19, 1997.

P. 10.10270 - News Release: Facts Regarding Hudson River PCBs

	10.10270 Reassessment Phase 2 Low Resolution Coring Report

Tracking Changes in Sediment Inventory, July
1998 .

P. 10.10271 - News Release: Hudson River Reassessment Schedule

	10.10277	 Released; Peer Review Included; Proposed Plan Due

	 by December 2000, March 9, 1998.

P. 10.10278 - News Release: EPA Announces Experts Selected to

	10.102 82 Peer Review Computer Model Used for the Hudson

River PCB Superfund Site, June 26, 1998.

P. 10.10283 - News Release: Newest EPA Hudson River Study Finds
10.10286 PCB-Contaminated Sediments Not Being Buried by
Clean Sediments; 40-Percent PCB Loss Seen From
Thompson Island Pool Hot Spots, July 23, 1998.

P. 10.10287 - News Release: EPA Provides New York State

10.10288 $168,000 for Fish Consumption Health Advisory
Outreach, by New York State Department of
Environmental Conservation, September 30, 1998.

P. 10.10289 - News Release: EPA RV "Clean Waters" to Conduct

10.10290 Sediment Sampling off Rogers Island, October 14,
1998 .

P. 10.10291 - News Release: First Substantive Hudson River PCB

	10.10293 Reassessment Findings to be Peer Reviewed Early

in 1999, EPA Announces, November 17, 1998.

P. 10.10294 - News Release: EPA to Continue Work on Hudson
10.10295 River PCBs Reassessment; No Immediate Action
Planned, December 17, 1998.

P. 10.10296 - News Release: Review of Public Comments Confirms
10.10297 EPA PCB findings; GE Report Found Flawed,

January 6, 1999.

217


-------
P. 10.10298 - News Release: EPA Announces Experts Selected to

	10.10299 Peer Review Computer Model Used for the Hudson

River PCB Superfund Site [this peer review was
actually for the Data Evaluation and
Interpretation Report and Low Resolution Sediment
Coring Report], January 11, 1999.

P. 10.10300 - News Release: EPA Releases Responsiveness

10.10300 Summaries for Scopes of Work for Phase 2 Human
Health Risk Assessment and Ecological Risk
Assessment for the Hudson River PCBs Project,
May 11, 1999.

P. 10.10301 - News Release: EPA Baseline Modeling Report

	10.10302 Released: Model Confirms Sediments are Still

Source of PCBs to Hudson River and Will be Years,
May 18, 1999.

P. 10.10303 - News Release: EPA Releases Two New Reassessment
10.10305 Documents and Announces Detailed Schedule of

Remaining Work for the Hudson River Reassessment
December 2000 Date Firm for Proposed Plan,

June 22, 1999.

P. 10.10306 - News Release: Latest EPA Reports Show Serious

10.10309	Risk to Human Health and Environment from PCB
Contamination in Upper Hudson River; EPA Risk
Assessments Confirm Exposure to PCBs in River May
Increase Cancer Risk, Other Non-Cancer Health
Hazards and Threaten Fish & Wildlife, August 4,
1999.

P. 10.10310 - News Release: EPA to Remove Contaminated Soil

10.10310	from Residential Properties on Rogers Island,
October 7, 1999.

P. 10.10311 - News Release: EPA reports show PCBs from Upper

	10.10313 Hudson River May Affect Human Health in Mid-

Hudson ; Threaten Fish & Wildlife in Lower Hudson
for Decades, January 4, 2000.

P. 10.10314 - News Release: Panel for Third Round of Peer

10.10315 Review for Hudson River PCBs Announced by EPA,
January 11, 2000.

P. 10.10316 - News Release: EPA Releases Revised Baseline
10.10317 Modeling Report for Hudson River PCBs

218


-------
Reassessment Project- Refinements Provide Further
Insight, January 31, 2000.

P. 10.10318 - News Release: EPA Proposes Comprehensive Plan to

	10.10319 Clean Up Hudson River PCBs; Proposal Based on

		Extensive Scientific Study of PCB Risks to People

and Wildlife, December 6, 2000.

P. 10.10320 - News Release: EPA Extending Time for Public to

10.1032	1	 Comment on Proposed Plan to Clean Up Hudson River

	 PCBs, January 18, 2001.

P. 10.10322 - News Release: Whitman Decides to Dredge Hudson

10.10322	River, August 1, 2001.

P. 10.10323 - List: Press Release Archive List for the Hudson
10.10324 River PCBs Site Reassessment posted on U.S. EPA,
Region II's Hudson River PCBs website at:
chttp://www.epa.gov/region02/superfnd/hudson/
pressreleasearchive.htm> (last updated September
27, 2000) .

P. 10.10325 - Superfund Update: Hudson River PCBs Reassessment
10.10329 RI/FS, Phase 2, U.S. EPA, Region II, October
1992 .

P. 10.10330 - Superfund Update: Hudson River PCBs Reassessment
10.10338 RI/FS, Phase 2, U.S. EPA, Region II, July 1995,
with enclosure entitled "Frequently Asked
Questions About EPA's Hudson River Reassessment."

P. 10.10339 - National Priority List Fact Sheet: Hudson River
10.10342 PCBs, by U.S. EPA, Region II, February 1998.

P. 10.10343 - Fact Sheet - Polychlorinated Biphenyls (PCBs)
10.10349 Update: Impact on Fish Advisories, U.S. EPA,

Office of Water, Publication No. EPA-823-F-99-
019, September 1999.

P. 10.10350 - National Priority List Fact Sheet: Hudson River

10.10354 PCBs, by U.S. EPA, Region II, September 26, 2000.

P. 10.10355 - Fact Sheet - PCBs & Human Health - Q & A, by U.S.
10.10358 EPA, Region II, [Date: 1998 or 1999].

P. 10.10359 - Fact Sheet - PCB's 101 - A Primer, Hudson River
10.10360 PCBs Reassessment Project, by U.S. EPA, Region
II, [Date: Early 2000].

219


-------
10.10361 - Fact Sheet Package - Hudson River PCBs
10.10377 Reassessment Project, by U.S. EPA, Region II.

Fact Sheets: Site Background, PCB's 101 - A
Primer, What We Know About PCBs in the Hudson
River, PCBs: hazardous to the Hudson, hazardous
to your health, The Feasibility Study and the
Proposed Plan; Chart: Species-weighted PCB
Concentrations in Fish: No Action vs. Action,
Thompson Island Pool; List: Information
repositories for the Hudson River PCBs
Reassessment Project. Date: December 2000.

10.10490 -Fact sheet: U.S. EPA, Region II, Superfund,
10.10492 Hudson River PCBs Peer Review, January 2, 2001.

10.10533 -Fact Sheet: Hudson River PCBs Reassessment Phase
.10.10534 2 Modeling Approach, Peer Review Fact Sheet,
September 1998.

10.11227 -Press Release: EPA Announces Implementation of
.10.1122 9 Community Interaction Program for the Hudson River
PCB Reassessment Study, January 30, 1991.

10.11230	-Press Advisory: U.S. EPA Holds Press Briefing to
.10.11230 Discuss Latest Findings on PCB-Contaminated

Sediments in the Hudson River, prepared by U.S.
EPA, Region II, July 22, 1998.

10.11231	-Chart: Comparison of Community Relations

10.11231	Activities Between SARA Requirements and CIP for
Hudson River PCBs Reassessment, prepared by TAMS
Consultants, Inc., prepared for U.S. EPA, Region
II, 1998.

10.11232	-Chart: Reassessment Schedule - Hudson River PCBs,

10.11233	prepared by U.S. EPA, Region II, June 10, 1999,
(Updated September 11, 2000.)

10.11234	-List: Information Repositories for the Hudson

10.11235	River PCBs Site, prepared by U.S. EPA, Region II,
October 23, 2001. (Available at

http://www.epa.gov/hudson/inforeps 9 9.htm)

10.11757 -Press Release: EPA Releases Hudson River Record of
.10.1175 9 Decision, For Release: Tuesday, December 4, 2001.

(Attachment: Fact Sheet: Hudson River Record of
Decision, December 4, 2001.)

220


-------
Newsletter - River Voices

001-1270-1273 River Voices, produced jointly by U.S. EPA, Region
II and the members of the Hudson River PCB
Reassessment Remedial Investigation/Feasibility
Study Liaison Groups, September 1, 1991.

P. 10.10221 - River Voices, produced jointly by U.S. EPA,

10.10224 Region II and the members of the Hudson River PCB
Reassessment RI/FS Liaison Groups, September 1,
1991.

P. 10.10225 - River Voices, produced jointly by U.S. EPA,

10.10228 Region II and the members of the Hudson River PCB
Reassessment RI/FS Liaison Groups,

February 1,1992.

P. 10.10229 - River Voices, produced jointly by U.S. EPA,
10.10232 Region II and the members of the Hudson

River PCB Reassessment RI/FS Liaison Groups,
October 1, 1992.

P. 10.10233 - River Voices, produced jointly by U.S. EPA,

10.10238 Region II and the members of the Hudson River PCB
Reassessment RI/FS Liaison Groups, May 1, 1993.

P. 10.10239 - River Voices, produced jointly by U.S. EPA,

10.10247 Region II and the members of the Hudson River PCB
Reassessment RI/FS Liaison Groups, July 1, 1994.

P. 10.10248 - River Voices, produced jointly by U.S. EPA,

10.10258 Region II and the members of the Hudson River PCB
Reassessment RI/FS Liaison Groups, November 1,
1998 .

10.7 Responsiveness Summary

P.	10.0001-	Report: Hudson River PCBs Reassessment RI/FS,

	10.0186 Responsiveness Summary for Volume 2A: Database

Report, Volume 2B: Preliminary Model Calibration
Report, Volume 2C: Data Evaluation and
Interpretation Report, Book 1 of 3 prepared by
TAMS Consultants, Inc., Limno-Tech, Inc.,
TetraTech, Inc., Menzie-Cura & Associates, Inc.,
prepared for U.S. EPA, Region II, and U.S. Army

221


-------
Corps of Engineers, Kansas City District, December
1998 .

P.	10.0187-	Report: Hudson River PCBs Reassessment RI/FS,

	10.0539 Responsiveness Summary for Volume 2A: Database

Report, Volume 2B: Preliminary Model Calibration
Report, Volume 2C: Data Evaluation and
Interpretation Report, Book 2 of 3 prepared by
TAMS Consultants, Inc., Limno-Tech, Inc.,
TetraTech, Inc., Menzie-Cura & Associates, Inc.,
prepared for U.S. EPA, Region II, and U.S. Army
Corps of Engineers, Kansas City District, December
1998 .

P.	10.0540-	Report: Hudson River PCBs Reassessment RI/FS,

	10.0738 Responsiveness Summary for Volume 2A: Database

Report, Volume 2B: Preliminary Model Calibration
Report, Volume 2C: Data Evaluation and
Interpretation Report, Book 3 of 3 prepared by
TAMS Consultants, Inc., Limno-Tech, Inc.,
TetraTech, Inc., Menzie-Cura & Associates, Inc.,
prepared for U.S. EPA, Region II, and U.S. Army
Corps of Engineers, Kansas City District, December
1998 .

P. 10.0739- Report: Hudson River PCBs Reassessment RI/FS,

	10.0979 Responsiveness Summary for Volume 2C-A Low

Resolution Sediment Coring Report, Addendum To The
Data Evaluation and Interpretation Report, Book 1
of 2, prepared by TAMS Consultants, Inc. and
TetraTech, Inc., prepared for the U.S. EPA, Region
II, and the U.S. Army Corps of Engineers, Kansas
City District, February 1999.

P. 10.0980- Report: Hudson River PCBs Reassessment RI/FS,

	10 .1194 Responsiveness Summary for Volume 2C-A Low

Resolution Sediment Coring Report, Addendum To The
Data Evaluation and Interpretation Report, Book 2
of 2, prepared by TAMS Consultants, Inc. and
TetraTech, Inc., prepared for the U.S. EPA, Region
II, and the U.S. Army Corps of Engineers, Kansas
City District, February 1999.

P. 10.4201 - Report: Responsiveness Summary for the Phase 1

	10.4686 Report, Hudson River PCB Reassessment RI/FS,

	Alternative Remedial Contracting Strategy (ARCS)

for Hazardous Waste Remedial Services, prepared by

222


-------
TAMS Consultants, Inc. and Gradient Corporation,
prepared for U.S. EPA, Region II, July 1992.

P. 10.4687 - Report: Appendix to Responsiveness Summary for

	10.5395 the Phase 1 Report, Hudson River PCB Reassessment

	RI/FS, Alternative Remedial Contracting Strategy

	(ARCS) for Hazardous Waste Remedial Services,

prepared by TAMS Consultants, Inc. and Gradient
Corporation, prepared for U.S. EPA, Region II,
July 1992.

10.7 Responsiveness Summary -

Additional References

P. 10.11236 -Letter (w/attachments) to Ms. Helen Chernoff, TAMS

10.11246 Consultants, Inc., from Mr. Lawrence Bickford,

Croton-on-Hudson, re: Hudson River Bird Sightings,
October 7, 1999.

P. 10.11247 -Column: Dairy Excel Column, Farm and Dairy,

10.11248	prepared by Dianne Shoemaker, February 10, 2000.

P. 10.11249 -E-mail to (Helen Chernoff),

10.11249	Environmental Scientist, TAMS Consultants, Inc.,
from Mr. Edward Garvey, TAMS Consultants, Inc.,
re: Conversation with K. Farley - 2nd attempt,
February 26, 2001.

P. 10.11250 -E-mail (w/attachments) to Mr. Douglas Tomchuk,

10.11258	Project Manager, U.S. EPA, Region II, from Mr.
Kevin Farrar, re: Calculations, June 21, 2001.

P. 10.11259 -E-mail to Mr. Victor Frankenthaler, Senior

10.11259	Environmental Planner, TAMS Consultants, Inc.,
from Mr. Peter Erickson, re: Nighttime lighting
impact on dairy cattle, June 27, 2001.

P. 10.11260 -E-mail to Mr. Victor Frankenthaler, Senior

10.11261 Environmental Planner, TAMS Consultants, Inc.,
from Ms. Dianne Shoemaker, District Specialist,
The Ohio State University, Northeast District, re:
Nighttime lighting impacts on dairy cattle, June
27, 2001.

223


-------
P. 10.11262 -E-mail to Mr. Victor Frankenthaler, Senior

10.11262 Environmental Planner, TAMS Consultants, Inc.,
from Geoff Dahl, Ph.D., University of Illinois,
re: Nighttime lighting impacts on dairy cattle,
June 29, 2001.

P. 10.11263 -E-mail to Ms. Alison Hess, U.S. EPA, Region, II,
10.11272 from Ms. Helen Chernoff, Environmental Scientist,
TAMS Consultants, Inc., re: GE's Review of tree
swallow study, October 30, 2001. (Attachment:
Letter to Ms. Anne Secord, U.S. Fish and Wildlife
Service, from John P. McCarty, Ph.D., University
of Maryland, re: Comments on GE's evaluation of
the Hudson River Tree Swallow study, May 22,
2001. )

10.10 Correspondence - Community Interaction Program/Liaison

Groups

Hudson River Oversight Committee

P. 10.11273 -Letter to Distribution, from Ms. Kathleen C.
10.11274 Callahan, Director, Emergency and Remedial

Response Division, U.S. EPA, Region II, re: Hudson
River PCBs Site - Reassessment RI/FS, March 6,
1991.

P. 10.11275 -Letter (w/attachment) to Distribution, from Mr.

10.11278	Douglas J. Tomchuck, Project Manager, U.S. EPA,
Region II, re: Hudson River PCBs Site - Oversight
Committee, March 28, 1991.

P. 10.11279 -Letter to Mr. Douglas Tomchuk, Project Manager,

10.11279	U.S. EPA, Region II, from Mr. William T. Ports,
Environmental Engineer 2, New York State
Department of Environmental Conservation, re:
Hudson River PCB Site No.: 5-46-031, March 29,
1991.

P. 10.11280 -Letter (w/attachment) to Committee Member, from
10.11285 Ms. Ann Rychlenski, Community Relations

Coordinator, U.S. EPA, Region II, re: Minutes of
the Hudson River Oversight Committee meeting held
April 4, 1991 and minutes of Scientific and
Technical Committee meeting held April 2, 1991,
April 17, 1991.

224


-------
P. 10.11286 -Letter to Distribution, from Mr. William McCabe,

10.11287	Deputy Director, U.S. EPA, Region II, re: Hudson
River PCBs Oversight Committee, October 8, 1991.

P. 10.11288 -Letter to Mr. John Haggard, Engineering Project

10.11288	Manager, General Electric Company, from Mr.

Douglas J. Tomchuk, Project Manager, U.S. EPA,
Region II, re: Meeting on the Hudson River PCBs
Site Risk Assessment, January 13, 1992.

P. 10.11289 -Letter to Member of the Hudson River Oversight
10.11290 Committee, from Mr. Thomas C. Jorling,

Commissioner, State of New York Department of
Environmental Conservation, re: Response to
concerns regarding Project Sponsor Group and the
Hudson River PCB Reassessment Project, January 21,

1992	.

P. 10.11291 -Comments: Comments to the Hudson River Oversight

	10.11292 Committee, prepared by Ms. Judy Schmidt-Dean,

Chair/Citizen Liaison Group, January 21, 1992.

P. 10.11293 -Letter to Members of the Hudson River PCB

10.11293	Oversight Committee, from Mr. Douglas J. Tomchuk,
Project Manager, U.S. EPA, Region II, re:

September 1, 1992 Hudson River PCBs Oversight
Committee meeting, August 11, 1992.

P. 10.11294 -Letter to Hudson River Oversight Committee Member,

10.11294	from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: October 20,

1993	Hudson River Oversight Committee meeting,
September 28, 1993.

P. 10.11295 -Letter to HROC Member, from Mr. Douglas J.

10.11295	Tomchuk, Project Manager, U.S. EPA, Region II, re:
October 8, 1997 Hudson River PCBs Oversight
Committee meeting, September 17, 1997.

P. 10.11296 -Letter to HROC Member, from Mr. William McCabe,
10.11297 Deputy Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: January 21,
1998 Hudson River PCBs Oversight Committee
meeting, December 30, 1997.

P. 10.11298 -Letter to Ms. Ann Rychlenski, Community Relations
10.11300 Coordinator, U.S. EPA, Region II, from Ms.

Merrilyn Pulver, Councilwoman, re: Comments to

225


-------
Hudson River Oversight Committee meeting, July 15,
1998 .

P. 10.11301 -Letter to Ms. Ann Rychlenski, Community Relations
10.11301 Coordinator, U.S. EPA, Region II, from Mr. Thomas
Borden, Chairman, Agricultural Liaison Committee,
re: Statement on behalf of Agricultural Liaison
Committee, July 19, 1999.

Liaison Groups

P. 10.11302 -Letter (w/attachment) to Hudson River Supporter,

10.11304	from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Invitation
to become an active member, January 8, 1991.

P. 10.11305 -Letter to Agricultural Liaison Group Member, from

10.11305	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: First
meeting of Agricultural Liaison Group, February
20, 1991.

P. 10.11306 -Facsimile to Ms. Ann Rychlenski, Community

10.11307 Relations Coordinator, U.S. EPA, Region II, from
Ms. Judy Schmidt-Dean, Chairman/Citizens Liaison
Group/HR PCB Reassessment, re: Results of meeting,
February 21, 1991.

P. 10.11308 -Letter to Agricultural Liaison Group Member, from

10.11309	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Hudson River
PCB Superfund Site Community Interaction Program,
February 21, 1991.

P. 10.11310 -Letter to Liaison Group Officer, from Ms. Ann

10.11310	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Officer of Liaison Group,
February 21, 1991.

P. 10.11311 -Letter to Citizen Liaison Group Member, from Ms.

10.11311	Ann Rychlenski, Community Relations Coordinator,
U.S. EPA, Region II, re: Meeting of the Citizen
Liaison Group on March 5, 1991, February 25, 1991.

P. 10.11312 -Letter (w/attachment) to Steering Committee

10.11313 Member, from Ms. Ann Rychlenski, Community

Relations Coordinator, U.S. EPA, Region II, re:

226


-------
March 12, 1991 Steering Committee meeting,
February 28, 1991.

10.11314	-Comments: Comments On: Phase 1 Work Plan, Work
_10.11314 Assignment 013-2N84, prepared by Ms. Celia Murray,

Concerned Citizens for the Environment, Citizen
Liaison Group, prepared for U.S. EPA, Region II,
March 6, 1991.

10.11315	-Letter to Members of Scientific and Technical

10.11320	Committee, from Ms. Kathleen C. Callahan,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Hudson River
PCBs Site - Reassessment RI/FS, March 6, 1991.

10.11321	-Memorandum to Hudson River PCB Steering Committee,

10.11321	from Ms. Bridget Barclay, Hudson River Sloop
Clearwater and Mr. Carl Deppe, CEASE, re: Comments
on the Phase I Work Plan, March 12, 1991.

10.11322	-Letter to Mr. Constantine Sidamon-Eristoff,

10.11326	Regional Director, U.S. EPA, Region II, from Ms.
Bridget Barclay, Environmental Director, Hudson
River Sloop Clearwater, Inc. re: Comments on Phase
I - Work Plan, Preliminary Assessment, Hudson
River PCB RI/FS, March 12, 1991.

10.11327	-Report: EPA Hudson River PCB Reassessment RI/FS,
_10.11328 Initial Report on Phase I to the CIP Steering

Committee, prepared by Citizen Liaison Committee,
March 12, 1991.

10.11329 -Comments: Agricultural Liaison Group, Phase I
_10.11331 Report, prepared by Mr. Thomas A. Borden,

Agricultural Liaison Group, prepared for U.S. EPA,
Region II, March 12, 1991.

10.11332 -Letter to Ms. Ann Rychlenski, Community Relations

10.11332	Coordinator, U.S. EPA, Region, from Ms. Bridget
Barclay, Chair, Environmental Liaison Group, re:
Request for information from EPA, March 13, 1991.

10.11333	-Letter to Mr. Douglas Tomchuk, Project Manager,
10.11333 from Arthur C. Upton, M.D., Professor and

Director, NYU Medical Center, re: Review of Phase
I Work Plan Preliminary Reassessment and the Scope
of Work for the Hudson River PCB Reassessment
RI/FS, March 18, 1991.

227


-------
P. 10.11334 -Memorandum to Mr. Douglas Tomchuk, U.S. EPA,

10.11334 Region II, from Mr. Judith S. Weis, Department of
Biological Sciences, Rutgers University, re:
Comments on the Hudson River PCB Reassessment
RI/FS Work Plan and Scope of Work, March 19, 1991.

P. 10.11335 -Letter to Ms. Ann Rychlenski, Community Relations
10.11336 Coordinator, U.S. EPA, Region II, from Mr. Darryl
L. Decker, Chairman, Board of Supervisors,
Washington County, re: Concerns of Government
Liaison Group, March 21, 1991.

P. 10.11337 -Letter (w/attachments) to Liaison Group Officer,
10.11339 from Ms. Ann Rychlenski, Community Relations

Coordinator, U.S. EPA, Region II, re: April 3,
1991, meeting of Environmental Liaison Group,

March 21, 1991.

P. 10.11340 -Letter (w/attachment) to Liaison Group Member,

10.11341	from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: July 16,
1991 meeting of entire membership, June 20, 1991.

P. 10.11342 -Letter to Agricultural Liaison Group Member, from

10.11342	Ms. Ann Rychlenski, Public Affairs Specialist,
U.S. EPA, Region II, re: Briefing on Phase 2 Work
Plan, July 1, 1991.

P. 10.11343 -Letter to Liaison Group Member, from Ms. Ann

10.11343	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Phase I report on the Hudson
River PCB Reassessment, July 8, 1991.

P. 10.11344 -Letter to Mr. Darryl L. Decker, Chair, Government
10.11345 Liaison Group, from Mr. Constantine Sidamon-
Eristoff, re: Preliminary Risk Assessment for
Hudson River PCBs Superfund site, July 17, 1991.

P. 10.11346 -Letter (w/attachments) to Liaison Group Member,
10.11348 from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Liaison
Group Chairs and Co-chairs, July 29, 1991.

P. 10.11349 -Letter (w/attachments) to Hudson River Friend,
10.11352 from Ms. Ann Rychlenski, Community Relations

Coordinator, U.S. EPA, Region II, re: Community
Interaction Program, July 30, 1991.

228


-------
P. 10.11353 -Letter to Liaison Group Officer, from Ms. Ann

10.11353	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Flyers for EPA's public
availability and phone-in session for the Hudson
River PCB Reassessment Phase I report, August 22,
1991.

P. 10.11354 -Letter to Ms. Cara Lee, Scenic Hudson, from Ms.

10.11354	Ann Rychlenski, Community Relations Coordinator,
U.S. EPA, Region II, re: Flyers for EPA's public
availability and phone-in session for the Hudson
River PCB Reassessment Phase I report, August 22,
1991.

P. 10.11355 -Letter to Citizen Liaison Group Member, from Ms.

10.11355	Ann Rychlenski, Community Relations Coordinator,
U.S. EPA, Region II, re: October 9, 1991 Citizen
Liaison Group meeting, September 23, 1991.

P. 10.11356 -Letter to Agricultural Liaison Group Member, from

10.11356	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: October 15,
1991 Agricultural Liaison Group meeting, September
23, 1991.

P. 10.11357 -Letter to Liaison Group Member, from Ms. Ann

10.11357	Rychlenski, Community Relations Coordinator and
Steering Committee Chair, U.S. EPA, Region II, re:
October 16, 1991 Steering Committee meeting,
September 30, 1991.

P. 10.11358 -Memorandum to Ms. Judy Dean, Citizen Liaison

10.11358	Group, Chair, from Mr. James Behan, Dunn
Geoscience, re: HRPCB Reassessment Phase I Report,
October 10, 1991.

P. 10.11359 -Memorandum to Government Liaison Group Members,

10.11359	from Mr. Darryl L. Decker, Chairman, Government
Liaison Group, Board of Supervisors, Washington
County, re: Hudson River PCB Reassessment Project,
November 20, 1991.

P. 10.11360 -Letter to Mr. Constantine Sidamon-Eristoff,

10.11362 Regional Administrator, U.S. EPA, Region II, from
Mr. Darryl L. Decker, Chairman, Government Liaison
Group, Board of Supervisors, Washington County,
re: Concern that NYSDEC is undermining the

229


-------
objectivity of the EPA reassessment, November 26,
1991.

10.11363 -Letter to Agricultural Liaison Group Member, from

10.11363	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: January 16,
1992 Agricultural Liaison Group meeting, January
7, 1992.

10.11364	-Letter (w/attachment) to Liaison Group Member,

10.11365	from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: EPA's
decision-making process workshop, January 7, 1992.

10.11366	-Letter to Citizen Liaison Group Member, from Ms.

10.11366	Ann Rychlenski, Community Relations Coordinator,
U.S. EPA, Region II, re: January 16, 1992 Citizen
Liaison Group meeting, January 9, 1992.

10.11367	-Letter to Mr. Darryl L. Decker, Chairman,

10.11370	Government Liaison Group, Washington County Board
of Supervisors, from Mr. Constantine Sidamon-
Eristoff, Regional Administrator, U.S. EPA, Region
II, re: Response to November 26, 1991 letter,
January 17, 1992.

10.11371	-Comments: Comments to the Hudson River Oversight
.10.11372 Committee, prepared by Ms. Judy Schmidt-Dean,

Chair/Citizen Liaison Group, January 21, 1992.

10.11373 -Report: Hudson River Oversight Committee,

.10.11375 Agricultural Liaison Group Report, prepared by Mr.

Thomas A. Borden, Chairman, Agricultural Liaison
Group, prepared for Mr. Constantine Sidamon-
Eristoff, Administrator, U.S. EPA, Region II,
January 21, 1992.

10.11376 -Letter to Members of the Citizens Liaison

10.11376	Committee, from Ms. Judy Schmidt-Dean,
Chair/Citizens Liaison Committee, re: Hudson River
PCB Reassessment, January 28, 1992.

10.11377	-Letter to Citizen Liaison Group Member, from Ms.
10.11379 Ann Rychlenski, Community Relations Coordinator,

U.S. EPA, Region II, re: Citizen Liaison Group
activities, February 6, 1992. (Attachment: Hudson
River PCB Reassessment, Citizen Liaison Group
Meeting - 1/16/92.)

230


-------
P. 10.11380 -Letter (w/attachment) to Hudson River Supporter,

10.11381 from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: EPA's
Community Interaction Program, March 25, 1992.

P. 10.11382 -Letter to Mr. Constantine Sidamon-Eristoff, Region

10.11385 II Administrator, U.S. EPA, Region II, from Mr.

Jeffery H. Kirby, General Counsel, Farm Bureau of
New York, re: Reassessment of Hudson River PCB
dredging alternative, June 3, 1992.

P. 10.11386 -Letter to John H. Claussen, Esq., from Mr. Douglas

10.11387	J. Tomchuk, Project Manager, U.S. EPA, Region II,
re: Joint Liaison Group Meeting, June 16, 1992.

P. 10.11388 -Letter to Ms. Ann Rychlenski, Community Relations

10.11388	Coordinator, U.S. EPA, Region II, from Mr. Thomas
A. Borden, Chairman, Agricultural Liaison
Committee, re: Hudson River PCB Reassessment, June
17, 1992.

P. 10.11389 -Letter to Jeffery H. Kirby, Esq., General Counsel,

10.11392	Farm Bureau of New York, from Mr. Constantine
Sidamon-Eristoff, Regional Administrator, U.S.
EPA, Region II, re: Hudson River PCB Reassessment
Study, June 18, 1992.

P. 10.11393 -Letter to Hudson River PCB Oversight Committee,

10.11393	from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Minutes of
the June 18, 1992 Joint Liaison Group meeting,

June 26, 1992.

P. 10.11394 -Letter to Liaison Group Officer, from Ms. Ann

10.11394	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: August 5, 1992 Steering
Committee meeting, July 16, 1992.

P. 10.11395 -Letter to Liaison Group Member, from Ms. Ann

10.11397	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: August 5, 1992 Steering
Committee meeting, July 20, 1992. (Attachment:
Listing of Liaison Group Officers.)

P. 10.11398 -Letter to Liaison Group Officer, from Ms. Ann

10.11398	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Agenda for August 5, 1992
Steering Committee meeting, July 21, 1992.

231


-------
P. 10.11399 -Letter to Mr. Douglas Tomchuk, Project Manager,

10.11399	U.S. EPA, Region II, from Ms. Judy Schmidt-Dean,
Chair, Citizens Liaison Group, re: Phase II Work
Plan and Sampling Plan, July 24, 1992.

P. 10.11400 -Letter to Liaison Group Member, from Ms. Ann

10.11400	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Coring demonstration field
trip, October 9, 1992.

P. 10.11401 -Letter to Ms. Ann Rychlenski, Community Relations

10.11403	Coordinator, U.S. EPA, Region II, from Mr. David
Adams, P.E., Government Liaison Group, re:
Questions for Scientific and Technical Committee
meeting, October 12, 1992. (Attachment: Mr.

Thomas Borden's questions on behalf of
Agricultural Liaison Group.)

P. 10.11404 -Letter to Ms. Ann Rychlenski, Community Relations

10.11404	Coordinator, U.S. EPA, Region II, from Ms. Eleanor
F. Brown, Community Interaction Program
Participant, re: Questions for Scientific and
Technical Committee from Community Interaction
Program Participants, Hudson River PCBs
Reassessment RI/FS, October 15, 1992.

P. 10.11405 -Questions for Scientific and Technical Committee,

10.11405	prepared by Mr. Carl Deppe, President, and Ms.
Sharon Ruggi, Vice President, Citizen
Environmentalists Against Sludge Encapsulation
(CEASE), October 15, 1992.

P. 10.11406 -Letter to Liaison Group Member, from Ms. Ann

10.11406	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: November 5, 1992, Joint
Liaison Group meeting, October 19, 1992.

P. 10.11407 -Topics for Joint Liaison Group Meeting, November

10.11407	5, 1992.

P. 10.11408 -Letter to Liaison Group Officer, from Ms. Ann

10.11409 Rychlenski, Community Relations Coordinator, U.S.

EPA, Region II, re: EPA's decision making process
workshop, January 5, 1993.

232


-------
P. 10.11410 -Letter to Agricultural Liaison Group Member, from
10.11410 Ms. Ann Rychlenski, Community Relations

Coordinator, re: February 11, 1993 Agricultural
Liaison Group meeting, January 26, 1993.

P. 10.11411 -Letter to Citizen Liaison Group Member, from Ms.
10.11412 Ann Rychlenski, Community Relations Coordinator,
U.S. EPA, Region II, re: Resignation of James
Behan, February 1, 1993. (Attachment: Letter to
Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, from Mr. James
P. Behan, TAMS Consultants, Inc., re: HRPCB
Citizen Liaison Group, January 26, 1993.)

P. 10.11413 -Letter to Mr. Lawrence Eckhardt, Rensselaer County

10.11415	Farm Bureau, from Mr. Thomas Borden, President,
Washington County, Farm Bureau, re: Hudson River
PCB Reassessment, February 6, 1993. (Attachment:
Letter to Honorable Carol Browner, Administrator,
U.S. EPA, from Mr. Thomas A. Borden, President,
Washington County Farm Bureau, re: Hudson River
PCBs Site, February 2, 1993.)

P. 10.11416 -Letter to Citizen Liaison Group Members, from Ms.

10.11416	Ann Rychlenski, Community Relations Coordinator,
U.S. EPA, Region II, re: February 18, 1993 Citizen
Liaison Group meeting, February 10, 1993.

P. 10.11417 -Letter to Liaison Group Member, from Ms. Ann

10.11417	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Request for written
contributions for River Voices update, February

24,	1993.

P. 10.11418 -Letter to Liaison Group Member, from Ms. Ann

10.11418	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Election of new Co-Chair,

March 1, 1993.

P. 10.11419 -Letter to Ms. Ann Rychlenski, Community Relations
10.11423 Coordinator, U.S. EPA, Region II, from Mr. George
Hodgson, Jr., Director, Environmental Management
Council, re: March 9, 1993 meeting minutes, March

25,	1993. (Attachment: March 9, 1993 Meeting	

	Minutes, Hudson River PCB Reassessment Project	

	Liaison Group Chairs & Co-Chairs.)

233


-------
P. 10.11424 -Letter to Liaison Group Member, from Ms. Ann

10.11424 Rychlenski, Community Relations Coordinator, U.S.

EPA, Region II, re: May 27, 1993 Scientific and
Technical Committee meeting, May 12, 1993.

P. 10.11425 -Letter (w/attachments) to Liaison Group Member,

10.11427	from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Community
Interaction Program for Hudson River PCBs
Reassessment, June 10, 1993.

P. 10.11428 -Letter to Ms. Judy Schmidt-Dean, Chairman,

10.11428	Citizens Liaison Group, from Ms. Eleanor F. Brown,
Community Interaction Program Participant, re:

June 6 memo from Liaison Committee Chairs - Hudson
River Reassessment, June 22, 1993.

P. 10.11429 -Letter to Ms. Bridget Barclay, Chairman,

10.11429	Environmental Liaison Group, re: New Member of
Environmental Liaison Group, June 29, 1993.

P. 10.11430 -Letter to Liaison Group Member, from Ms. Ann

10.11430	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: October 20, 1993 Hudson River
Oversight Committee meeting, September 21, 1993.

P. 10.11431 -Letter to Liaison Group Officer, from Ms. Ann

10.11431	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: October 20, 1993 Hudson River
PCBs Oversight Committee meeting, September 28,
1993.

P. 10.11432 -Letter to Liaison Group Member, from Ms. Ann

10.11432	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: November 22, 1993 Joint
Liaison Group meeting, November 5, 1993.

P. 10.11433 -Letter (w/attachments) to Liaison Group Member,

10.11437 from Ms. Ann Rychlenski, Community Relations

Coordinator, U.S. EPA, Region II, re: Community
Interaction Program for Hudson River PCBs
Superfund Site Reassessment, November 11, 1993.
(Attachments: (1) Letter to Ms. Ann Rychlenski,
Community Relations Coordinator, U.S. EPA, Region
II, from Mr. Kenneth G. Dufty, President,

Concerned Citizens for the Environment, Inc., re:
Resignation of Concerned Citizens for the
Environment, Inc., October 25, 1993; and (2)Letter

234


-------
to Mr. Kenneth G. Dufty, President,Concerned
Citizens for the Environment, Inc., from Ms. Ann
Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Response to letter of October
25, 1993 concerning resignation of Concerned
Citizens for the Environment, Inc. organization,
November 10, 1993.)

P. 10.11438 -Letter to Liaison Group Member, from Ms. Ann

10.11438	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Community Interaction Program
for Hudson River PCBs Superfund Site Reassessment
RI/FS, December 9, 1993.

P. 10.11439 -Letter to Liaison Group Member, from Ms. Ann

10.11439	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: February 9, 1994 Scientific
and Technical Committee meeting, January 31, 1994.

P. 10.11440 -Letter to Liaison Group Member, from Ms. Ann

10.11440	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Postponed February 9, 1994
Scientific and Technical Committee meeting,
February 15, 1994.

P. 10.11441 -Letter to Liaison Group Member, from Ms. Ann

10.11441	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: March 24, 1994 rescheduled
Scientific and Technical Committee meeting, March
9, 1994.

P. 10.11442 -Letter to Liaison Group Member, from Ms. Ann

10.11442	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: April 18, 1994 Joint Liaison
Group meeting, April 5, 1994.

P. 10.11443 -Letter to Environmental Liaison Group Member, from

10.11443	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Resignation
of Chair of the Environmental Liaison Group,
January 3, 1995.

P. 10.11444 -Letter to Liaison Group Member, from Ms. Ann

10.11445 Rychlenski, Community Relations Coordinator, U.S.

EPA, Region II, re: New Environmental Liaison
Group Chairperson and Co-Chair, January 19, 1995.

235


-------
P. 10.11446 -Letter to Liaison Group Officer, from Ms. Ann

10.11446 Rychlenski, Community Relations Coordinator, U.S.

EPA, Region II, re: Recently published update on
EPA's Hudson River PCB Reassessment RI/FS, August
8, 1995.

P. 10.11447 -Letter to Liaison Group Officer, from Ms. Ann

10.11448 Rychlenski, Community Relations Coordinator, U.S.

EPA, Region II, re: Election of new Chairperson,
September 25, 1995.

P. 10.11449 -Letter to Liaison Group Member, from Ms. Ann

10.11450	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Phase 2 report for the Hudson
River PCB Reassessment, October 2, 1995.

P. 10.11451 -Letter to Liaison Group Member, from Ms. Karen M.

10.11451	Coghlan, Community Relations Specialist, TAMS
Consultants, Inc., re: Election of two new
chairpersons on the Environmental Liaison Group,
October 13, 1995.

P. 10.11452 -Agenda: Hudson River PCBs Reassessment, Community

	10.11452 Interaction Program, Joint Liaison Group Meeting,

Albany, New York, October 18, 1995.

P. 10.11453 -Letter to Liaison Group Member, from Ms. Ann

10.11453 Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: River Voices, November 7,
1995.

P. 10.11454 -Letter to All Interested Parties, from Mr. John E.
10.11454A LaPadula, for Mr. William McCabe, Deputy Director,
U.S. EPA, Region II, re: Database Report, November
20, 1995.

10.11455 -Letter to Mr. Paul McDowell, New York State Farm
10.11455 Bureau, from Ms. Ann Rychlenski, Community

Relations Coordinator, U.S. EPA, Region II, re:
Delay in Phase 2 Database Report, November 21,
1995.

P. 10.11456 -Letter (w/attachments) to Liaison Group Member,
10.11458 from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Phase 2
Report, Review Copy - Further Site
Characterization and Analysis, Database Report,
November 27, 1995.

236


-------
16. 10.11459 -Letter to Mr. Carl Deppe, Co-Chair, Environmental

10.11459	Liaison Group, from Ms. Ann Rychlenski, Community
Relations Coordinator, U.S. EPA, Region II, re:
New member of Environmental Liaison Group,

February 23, 1996.

P. 10.11460 -Letter to Environmental Liaison Group Member, from

10.11460	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, for Mr. John
Santacrose, Chair, Environmental Liaison Group,
re: April 11, 1996 Environmental Liaison Group
meeting, March 11, 1996.

P. 10.11461 -Letter to Agricultural Liaison Group Member, from

10.11461	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: April 10,
1996 briefing on the Hudson River PCBs
Reassessment Project, March 19, 1996.

P. 10.11462 -Letter to Mr. John Santacrose, Chair,

10.11462	Environmental Liaison Group, from Ms. Ann
Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: New Environmental Liaison
Group members, April 4, 1996.

P. 10.11463 -Letter to Liaison Group Member, from Ms. Ann

10.11464	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Hudson River PCBs Reassessment
Database, April 24, 1996.

P. 10.11465 -Letter to Liaison Group Member, from Ms. Ann

10.11465	Rychlenski, Public Outreach Specialist, U.S. EPA,
Region II, re: October 28, 1996 Joint Liaison
Group meeting, October 10, 1996.

P. 10.11466 -Letter to Liaison Group Member, from Ms. Ann

10.11466	Rychlenski, Public Affairs Specialist, U.S. EPA,
Region II, re: April 1, 1997 Liaison Group
meeting, March 13, 1997.

P. 10.11467 -Letter to Honorable Carol Browner, Administrator,

10.11473 U.S. EPA, from Mr. Thomas Borden, Chair,

Agricultural Liaison Group, et al, re: Hudson
River PCB Superfund Site, Public Participation
Program, September 8, 1997.

237


-------
P. 10.11474 -Letter to Liaison Group Member, from Ms. Ann

10.11475	Rychlenski, Steering Committee Chair, U.S. EPA,
Region II, re: Minutes of September 24, 1997
Steering Committee meeting for Hudson River
Reassessment Project, October 24, 1997.

P. 10.11476 -Letter to Ms. Ann Rychlenski, Community Relations

10.11476	Coordinator, U.S. EPA, Region II, from Mr. Kenneth
Dufty, Director, Rensselaer County Environmental
Management Council, re: Hudson River Reassessment
Program, October 30, 1997.

P. 10.11477 -Letter to Ms. Margaret Stein, Governmental

10.11478 Liaison Group, from Ms. Ann Rychlenski, Public

Affairs Specialist, U.S. EPA, Region II, re: EPA
Hudson River PCB Reassessment Community
Interaction Program, November 4, 1997.

P. 10.11479 -Letter (w/attachment) to Mr. Richard Caspe,

10.11482 Director, Emergency & Remedial Response Division,
U.S. EPA, Region II, from Ms. Judith Schmidt-Dean,
Chair, Citizen Liaison Group, re: Hudson River
PCBs, Landfill siting study, November 16, 1997.

P. 10.11483 -Letter (w/attachment) to Honorable Carol Browner,
10.11487 Regional Administrator, U.S. EPA, from Ms. Judith
Schmidt-Dean, Chair, Citizen Liaison Group, re:
Hudson River PCBs landfill siting study, November
16, 1997.

P. 10.11488 -Letter to Mr. Thomas Borden, Chair, Agricultural
10.11490 Liaison Group, from Honorable Jeanne M. Fox,

Regional Administrator, U.S. EPA, re: Hudson River
Superfund Site, Community Interaction Program,
November 26, 1997. (Attachment: List: Liaison
Group Officers.)

P. 10.11491 -Letter to Liaison Group Member, from Ms. Ann

10.11492	Rychlenski, Public Affairs Specialist, U.S. EPA,
Region II, re: January 21, 1998 Hudson River
Oversight Committee meeting, January 9, 1998.

P. 10.11493 -Letter to Environmental Liaison Group Member, from

10.11493	Ms. Ann Rychlenski, Public Affairs Specialist,
U.S. EPA, Region II, re: New co-chair member for
Environmental Liaison Group, January 9, 1998.

238


-------
P. 10.11494 -Letter to Ms. Judith Schmidt-Dean, Chair, Citizens

10.11495	Liaison Group, from Mr. Richard L. Caspe,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Response to
November 16, 1997 letter concerning the
landfill/treatment facility siting survey, January
20, 1998.

P. 10.11496 -Letter to Liaison Group Member, from Ms. Ann

10.11496	Rychlenski, Chair, Steering Committee, U.S. EPA,
Region II, re: April 27, 1998 Steering Committee
meeting, March 17, 1998.

P. 10.11497 -Letter to Liaison Group Member, from Ms. Karen

10.11497	Coghlan, Community Relations Specialist, re:
Steering Committee Meeting, April 27, 1998, Hudson
River PCBs Reassessment Remedial
Investigation/Feasibility Study, Community
Interaction Program, April 14, 1998.

P. 10.11498 -Letter to Liaison Group Member, from Mr. William

10.11498	McCabe, Deputy Director, Emergency and Remedial
Response Division, for Mr. Richard Caspe, P.E.,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Visual
inspection, June 2, 1998.

P. 10.11499 -Letter to Liaison Group Member, from Ms. Ann

10.11499	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: July 15, 1998 Hudson River
PCBs Reassessment Oversight Committee meeting,

June 29, 1998.

P. 10.11500 -Letter to Oversight Committee Member, from Ms. Ann

10.11500	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: July 15, 1998 Hudson River
PCBs Reassessment Oversight Committee meeting,

June 29, 1998.

P. 10.11501 -Letter to Liaison Group Member, from Ms. Ann

10.11501	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: July 23, 1998 Joint Liaison
Group meeting, July 7, 1998.

P. 10.11502 -Letter to Honorable Carol Browner, Administrator,

10.11504 U.S. EPA, from Ms. Sharon Ruggi, Member, EPA

Environmental Liaison Group, re: Hudson River PCB
Superfund Site, July 10, 1998.

239


-------
P. 10.11505 -Letter to Agricultural or Citizen Liaison Group

10.11505	Member, from Ms. Ann Rychlenski, Community
Relations Coordinator, U.S. EPA, Region II, re:
August 11, 1998 Agricultural Liaison Group and
Citizen Liaison Group meeting, July 29, 1998.

P. 10.11506 -Letter to Liaison Group Member, from Ms. Ann

10.11506	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: August 18, 1998 Scientific and
Technical Committee meeting, July 29, 1998.

P. 10.11507 -Letter (w/attachments) to Liaison Group Member,

10.11510	from Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Peer Review
of EPA's Hudson River PCBs Phase 2 Preliminary
Model Calibration Report, August 25, 1998.

P. 10.11511 -Letter to Liaison Group Member, from Ms. Ann

10.11511	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: September 23, 1998 Joint
Liaison Group meeting, September 2, 1998.

P. 10.11512 -Letter to Liaison Group Member,	from Ms. Ann

10.11512	Rychlenski, Steering Committee,	Chair, U.S. EPA,
Region II, re: October 19, 1998	Steering Committee
meeting, October 7, 1998.

P. 10.11513 -Memorandum from Ms. Judith Schmidt-Dean,

10.11513	Chair, Citizen's Liaison Group, re: TAG Grant
Awarded to Scenic Hudson in 1997, October 19,

1998 .

P. 10.11514 -Letter to Liaison Group Member, from Ms. Ann

10.11514	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Phase 2 Hudson River PCBs
Reassessment, December 2, 1998.

P. 10.11515 -Letter to Liaison Group Member, from Ms. Ann

10.11515	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Peer review meeting for
science contained in Phase 2 Data Evaluation and
Interpretation Report and the Phase 2 Low
Resolution Sediment Coring Report, December 29,
1998 .

240


-------
P. 10.11516 -Letter to Liaison Group Member, from Ms. Ann

10.11516 Rychlenski, Community Relations Coordinator, U.S.

EPA, Region II, re: January 26, 1999 Hudson River
Oversight Committee meeting, January 5, 1999.

P. 10.11517 -Letter to Mr. Richard Caspe, Director, Emergency &

10.11518	Remedial Response Division, U.S. EPA, Region II,
from Mr. Rich Schiafo, Environmental Associate,
Scenic Hudson, Inc., re: Steering Committee
meeting for Hudson River PCBs Reassessment, April
23, 1999.

P. 10.11519 -Letter to All Interested Parties, from Ms. Karen

10.11519	M. Coghlan, Associate, Community Relations
Specialist, TAMS Consultants, Inc., re: Joint
Liaison Group Meeting, May 18, 1999, May 4, 1999.

P. 10.11520 -Letter to Honorable Jeanne Fox, Regional

10.11521	Administrator, U.S. EPA, Region II, from Mr. Rich
Schiafo, Environmental Associate, Scenic Hudson,
Inc., re: Results of the Phase 2 Baseline Modeling
Report, May 19, 1999.

P. 10.11522 -Letter to Liaison Group Member, from Ms. Ann

10.11522	Rychlenski, Public Affairs Specialist, U.S. EPA,
Region II, re: Phase 2 Baseline Modeling Report,
June 7, 1999.

P. 10.11523 -Letter to Liaison Group Member, from Ms. Ann

10.11523	Rychlenski, Public Affairs Specialist, U.S. EPA,
Region II, re: August 4, 1999 and August 5, 1999
Joint Liaison Group meetings, July 14, 1999.

P: 10.11524 -Letter to Mr. William McCabe, Deputy Director,

10.11524	Emergency & Remedial Response Division, U.S. EPA,
Region II and Mr. John Haggard, Hudson River
Project Manager, General Electric Co., from Ms.
Merrilyn Pulver, Agricultural Liaison Committee
Co-Chairwoman; Fort Edward Town Councilwoman, re:
Request for public meeting on Hudson River PCB
issue, August 17, 1999.

P. 10.11525 -Letter to Liaison Group Member, from Ms. Ann

10.11525	Rychlenski, Steering Committee Chair, U.S. EPA,
Region II, re: October 26, 1999 Steering Committee
meeting, September 27, 1999.

241


-------
P: 10.11526 -Statement to the U.S. EPA, re: Human Health Risk
10.11527 Assessment for the Mid-Hudson River and the

Ecological Risk Assessment Addendum: Future Risks
in the Lower Hudson River, prepared by Mr. Rich
Schiafo, Scenic Hudson, Inc., January 11, 2000.

P: 10.11528 -Letter to Liaison Group Officers, from Ms. Alison

10.11537	A. Hess, C.P.G., Project Manager, U.S. EPA, Region
II, re: Hudson River PCBs Reassessment RI/FS,
September 8, 2000. (Attachment: (1) Memorandum to
Director, Office of Site Remediation and
Restoration, Region I; Director, Emergency and
Remedial Response Division, Region II; Director,
Hazardous Waste Management Division, Regions III,
IX; Director, Waste Management Division, Region
IV; Director, Superfund Division, Regions V, VI,
VII; Assistant Regional Administrator, Office of
Ecosystems Protection and Remediation, Region
VIII; Director, Environmental Cleanup Office,
Region X, from Mr. Stephen D. Luftig, Director,
Office of Emergency and Remedial Response, U.S.
EPA, re: National Remedy Review Board, September
26, 1996; (2) Fact Sheet: Round Three: Superfund
Reforms at a Glance, October 1995.)

P. 10.11538 -Letter to Governmental Liaison Group Member, from

10.11538	Ms. Ann Rychlenski, Community Relations
Coordinator, U.S. EPA, Region II, re: Membership
eligibility for Governmental Liaison Group,
undated.

P. 10.11539 -Letter to Liaison Group Officers, from Ms. Ann

10.11540 Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: January 8, 1992 Steering
Committee meeting and January 21, 1992 Hudson
River PCB Oversight Committee meeting, undated.

P. 10.11541 -Individual questions submitted by Liaison Group
10.11542 Members (Categorized as per agenda), undated.

Scientific and Technical Committee

P. 10.11543 -Letter (w/attachments) to Distribution, from Mr.
10.11546 Douglas J. Tomchuk, Project Manager, U.S. EPA,

Region II, re: Hudson River PCBs Site - Scientific
and Technical Committee, March 27, 1991.

242


-------
P. 10.11547 -Facsimile letter to Mr. Douglas Tomchuk, Project

10.11549 Manager, U.S. EPA, Region II, from Mr. John Davis,
Environmental Scientist, State of New York
Department of Law, re: Hudson River PCBs -
Reassessment RI/FS, March 28, 1991.

P. 10.11550 -Summary of Phase I, Hudson River PCBs Reassessment

10.11554	RI/FS, Science and Technical Committee Meeting,
April 2, 1991.

P. 10.11555 -Letter to Committee Member, from Ms. Ann

10.11555	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: Minutes of the Science and
Technical Committee meeting held April 2, 1991,
April 17, 1991.

P. 10.11556 -Letter to Addressees, from Mr. Douglas Tomchuk,
10.11558 Project Manager, U.S. EPA, Region II, re: Hudson
River PCBs Site - Scientific and Technical
Committee, May 7, 1991.

P. 10.11559 -Letter (w/attachment) to Addressees, from Mr.

10.11561A Douglas Tomchuk, Project Manager, U.S. EPA, Region
II, re: Hudson River PCBs Site - Scientific and
Technical Committee, June 27, 1991.

P. 10.11562 -Letter (w/attachments) to Addressees, from Mr.

10.11566 Douglas Tomchuk, Project Manager, U.S. EPA, Region
II, re: Hudson River PCBs Site - Scientific and
Technical Committee, July 31, 1991.

P. 10.11567 -Memorandum (w/attachment) to Mr. Douglas Tomchuk,
10.11572 Project Manager, U.S. EPA, Region II, from Mr.

Daniel A. Abramowicz, Chairman, Scientific and
Technical Committee, General Electric Company, re:
Phase I EPA Report of RI/FS, September 23, 1991.

P. 10.11573 -Letter to Members of the Scientific and Technical
10.11574 Committee, from Ms. Kathleen C. Callahan,

Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Function of
Scientific and Technical Committee, March 27,

1992 .

P. 10.11575 -Letter to James A. Sevinsky, Esq., Assistant

10.11576 Attorney General, Environmental Protection Bureau,
State of New York, from Honorable Constantine
Sidamon-Eristoff, Regional Administrator, U.S.

243


-------
EPA, Region II, re: Response to request for
replacement of Dr. Abramowicz as chairman, April
9, 1992. (Attachment: Letter to Honorable
Constantine Sidamon-Eristoff, Regional
Administrator, U.S. EPA, Region II, from James A.
Sevinsky, Esq., Assistant Attorney General, State
of New York, re: Replacement of Dr. Abramowicz as
chairman, March 13, 1992.)

P. 10.11577 -Letter to Honorable Constantine Sidamon-Eristoff,

10.11577	Regional Administrator, U.S. EPA, Region II, from
Ms. Bridget Barclay, Environmental Director,

Hudson River Sloop Clearwater, Inc., re:
Restructure of Scientific and Technical Committee,
April 9, 1992.

P. 10.11578 -Letter to Mr. Douglas Tomchuk, Project Manager,

10.11578	U.S. EPA, Region II, from Mr. John Davis,
Environmental Scientist, State of New York,
Department of Law, re: Hudson River Reassessment
RI/FS Scientific Technical Committee, June 23,
1992 .

P. 10.11579 -Letter to Honorable Constantine Sidamon-Eristoff,

10.11579	Regional Administrator, U.S. EPA, Region II, from
Mr. Duncan Fowler, re: Request to prevent a
conflict of interest, June 24, 1992.

P. 10.11580 -Letter to Scientific and Technical Committee

10.11580	Member, from Mr. Douglas Tomchuk, Project Manager,
U.S. EPA, Region II, re: July 10, 1992 Scientific
and Technical Committee meeting, June 26, 1992.

P. 10.11581 -Letter to Scientific and Technical Committee

10.11581	Member, from Ms. Ann Rychlenski, Community
Relations Coordinator, U.S. EPA, Region II, re:
Minutes from June 18, 1992 meeting, June 26, 1992.

P. 10.11582 -Review and comments on Phase 2 Work Plan and

10.11586 Sampling Plan for the Reassessment Remedial

Investigation and Feasibility Study for the Hudson
River PCB Superfund Site, prepared by Mr. Francis
J. Reilly, Jr., Senior Scientist, AScI
Corporation, July 8, 1992.

244


-------
10.11587 -Scientific and Technical Committee

10.11589	Recommendations, Phase 2 Program, prepared by Mr.
William J. Nicholson, Mount Sinai School of
Medicine, July 10, 1992.

10.11590	-Letter to Robert J. Kafin, Esq., Proskauer Rose

10.11591	Goetz & Mendelsohn, from Ms. Kathleen C. Callahan,
Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Hudson River
PCBs Site - Scientific and Technical Committee,
July 17, 1992.

10.11592	-Letter to Mr. Douglas Tomchuk, Project Manager,

10.11597	U.S. EPA, Region II, from George W. Putman, Ph.D.,
re: G.W. Putman - Comment/Recommendations re:

Phase 2 Work Plan and Sampling Plan, Hudson River
Reassessment RI/FS, July 22, 1992.

10.11598	-Facsimile (w/attachment) to Mr. Douglas Tomchuk,

10.11603	Project Manager, U.S. EPA, Region II, from George
W. Putman, Ph.D., re: Hudson River Reassessment -
Phase II, July 24, 1992.

10.11604	-Letter to Ms. Ann Rychlenski, Community Relations

10.11606	Coordinator, U.S. EPA, Region II, from David D.
Adams, P.E., Member, Government Liaison Group, re:
Questions for Scientific and Technical Committee,
October 12, 1992. (Attachment: Questions from Mr.
Thomas Borden on behalf of the Agricultural
Liaison Group.)

10.11607	-Questions for Scientific and Technical Committee,

10.11607	prepared by Mr. Carl Deppe, President, and Ms.
Sharon Ruggi, Vice President, Citizen
Environmentalists Against Sludge Encapsulation
(CEASE), October 15, 1992.

10.11608	-Letter to Ms. Ann Rychlenski, Community Relations

10.11608	Coordinator, U.S. EPA, Region II, from Ms. Eleanor
F. Brown, re: Questions for Scientific and
Technical Committee from Community Interaction
Program Participants, Hudson River PCBs
Reassessment RI/FS, October 15, 1992.

10.11609	-Letter to Dr. Daniel Abramowicz, General Electric
10.11609 Company, from Mr. Douglas J. Tomchuk, Project

Manager, U.S. EPA, Region II, re: Hudson River
PCBs Site - Joint Liaison Group Meeting with

245


-------
Members of the Scientific and Technical Committee,
October 30, 1992.

P. 10.11610 -Letter to Dr. James Bonner, Texas A&M University,
10.11610 from Mr. Douglas J. Tomchuk, Project Manager, U.S.

EPA, Region II, re: Hudson River PCBs Site - Joint
Liaison Group Meeting with Members of the
Scientific and Technical Committee, October 30,
1992 .

10.11611 -Letter to Dr. Richard Bopp, Rensselaer Polytechnic

10.11611	Institute, from Mr. Douglas J. Tomchuk, Project
Manager, U.S. EPA, Region II, re: Hudson River
PCBs Site - Joint Liaison Group Meeting with
Members of the Scientific and Technical Committee,
October 30, 1992.

10.11612	-Letter to Dr. William Nicholson, Mt. Sinai Medical

10.11612	Center, from Mr. Douglas J. Tomchuk, Project
Manager, U.S. EPA, Region II, re: Hudson River
PCBs Site - Joint Liaison Group Meeting with
Members of the Scientific and Technical Committee,
October 30, 1992.

10.11613	-Letter to Mr. Douglas Tomchuk, Project Manager,

10.11613	U.S. EPA, Region II, from Mr. John Davis,
Environmental Scientist, State of New York,
Department of Law, re: Hudson River RRI/FS
Advisory Committee, November 6, 1992.

10.11614	-Letter to Scientific and Technical Committee

10.11644 Member, from Mr. Douglas Tomchuk, Project Manager,

U.S. EPA, Region II, re: May 27, 1993 Scientific
and Technical Committee meeting, May 6, 1993.
(Attachments: (1) Figure 1, Site Location Map; (2)
Figure 1, Site Plan; (3) Figure 3, East Shore
Profile View; (4) Draft, General Electric Company,
Hudson River Project, Bakers Falls Investigation,
Water Column Testing Results Summary; (5) Table 1,
General Electric Company, Post-Construction
Remnant Deposit Monitoring Program, Hudson River
Water Column PCB Monitoring Results, (1/93); (6)
Table 2, General Electric Company, Post-
Construction Remnant Deposit Monitoring Program,
Statistical Summary, Hudson River Water Column PCB
Monitoring Results; (7) Table 1, General Electric
Company, Post-Construction Remnant Deposit
Monitoring Program, Hudson River Water Column PCB

246


-------
Monitoring Results, (3/93); (8) Table 1, General
Electric Company, Post-Construction Remnant
Deposit Monitoring Program, 1993 Hudson River
Water Column PCB Monitoring Results; (9) General
Electric Company, Post Construction Remnant
Deposit Monitoring Water Column Total PCB
Concentration vs Time; (10) General Electric
Company - Hudson River Project, 1991 - 1993 Water
Column Monitoring Results; (11) General Electric
Company - Hudson River Project, Water Column Total
PCB Float Survey Results; (12) General Electric
Company Post Construction Remnant Deposit
Monitoring Float Survey Homologs - August 27,
1992; (13) General Electric Company, Post-
Construction Remnant Deposit Monitoring Program,
Hudson River Float Survey PCB Monitoring Results;
(14) Memorandum (w/attachment) to Interested
Parties, from Ronald Sloan, Ph.D., Research
Scientist, New York State Department of
Environmental Conservation, re: Initial Hudson
River Fish PCB Results, January 22, 1993; (15)
Memorandum (w/attachment) to Interested Parties,
from Ronald Sloan, Ph.D., Research Scientist, New
York State Department of Environmental
Conservation, re: Second set of 1992 Hudson River
Fish PCB Results, March 16, 1993; (16) General
Electric Data Collection.)

p. 10.11645 -Letter to Liaison Group Member, from Ms. Ann

10.11645	Rychlenski, Community Relations Coordinator, U.S.
EPA, Region II, re: May 27, 1993 Scientific and
Technical Committee meeting for Hudson River PCBs
Reassessment RI/FS, May 12, 1993.

P. 10.11646 -Letter to Scientific and Technical Committee

10.11646	Member, from Mr. Douglas J. Tomchuk, Project
Manager, U.S. EPA, Region II, re: October 19, 1993
Scientific and Technical Committee meeting for
Hudson River PCBs, September 23, 1993.

P. 10.11647 -Letter to Mr. Douglas J. Tomchuk, Project Manager,
10.11669 U.S. EPA, Region II, from George W. Putman, Ph.D.,
Terran Research, Inc., re: Report abstract of
review on the historic data of upper Hudson
discharge, November 26, 1993. (Attachment:

Report: Discharge-Suspended Sediment - PCB
transport in the Upper Hudson; Comments on 1978 -
1992 Data.)

247


-------
P. 10.11670 -Letter to Scientific and Technical Committee

10.11670 Member, from Mr. Douglas J. Tomchuk, Project

Manager, U.S. EPA, Region II, re: February 9, 1994
Scientific and Technical Committee meeting,

January 31, 1994.

P. 10.11671 -Letter to Scientific and Technical Committee

10.11700	Member, from Mr. Douglas J. Tomchuk, Project
Manager, U.S. EPA, Region II, re: Rescheduled
Scientific and Technical Committee meeting, March
8, 1994. (Attachments: (1) Hudson River PCBs
Superfund Site Reassessment RI/FS, Scientific and
Technical Committee, Agenda; (2) Memorandum to
Hudson River Team, from Mr. Charles Menzie, Mr.
Jerry Cura and Ms. Trina von Stackelberg, Menzie-
Cura & Associates, Inc., re: Overview of Approach
and Interim Status: Fish Models, February 3,

1994.)

P. 10.11701 -Letter to STC Member, from Mr. Douglas J. Tomchuk,

10.11701	Project Manager, U.S. EPA, Region II, re: March 25
and 26, 1997, two-day Scientific and Technical
Committee meeting, March 3, 1997.

P. 10.11702 -Memorandum to Hudson River Science and Technical

10.11717	Committee, from Mr. John Haggard, Engineering
Project Manager, General Electric Company, re:
Hudson River - March 25-26 Meeting of the
Scientific and Technical Committee (STC), March
20, 1997. (Attachment: Report: Preliminary Review
of EPA's Data Evaluation Report, March 21, 1997.)

P. 10.11718 -Letter to STC Member, from Mr. Douglas J. Tomchuk,

10.11718	Project Manager, U.S. EPA, Region II, re: August
18, 1998, Scientific and Technical Committee
meeting, July 22, 1998.

P. 10.11719 -Letter to Members of the Scientific and Technical

10.11720 Committee, from Ms. Karen M. Coghlan, Associate,
Community Relations Specialist, TAMS Consultants,
Inc., re: June 16, 1999 meeting to discuss
Baseline Modeling Report, May 20, 1999.

P. 10.11721 -Letter to Mr. Douglas Tomchuk, Project Manager,

10.11723 U.S. EPA, Region II, from George W. Putman, Ph.D.,
University at Albany, re: Review of TAMS/EPA
Responsiveness Summaries books 1-3, PMCR and DEIR
and Low Resolution Coring Report, June 8, 1999.

248


-------
P. 10.11724 -Letter to STC Member, from Ms. Alison A. Hess,

10.11725	C.P.G., Project Manager, U.S. EPA, Region II, re:
September 16, 1999, Scientific and Technical
Committee meeting, August 24, 1999.

P. 10.11726 -Hudson River PCBs Site, STC Meetings, undated.

10.11726

P. 10.11727 -Hudson River PCBs Site, Reassessment RI/FS,

	10.11728 Purpose of the Scientific and Technical Committee,

undated.

Steering Committee

P. 10.11729 -Letter (w/attachment) to Steering Committee

10.11730	Member, from Ms. Ann Rychlenski, Community
Relations Coordinator, U.S. EPA, Region II, re:
March 12, 1991 Steering Committee meeting,

February 28, 1991.

P. 10.11731 -Memorandum to Hudson River PCB Steering Committee,

10.11731	from Ms. Bridget Barclay, Chair, Hudson River
Sloop Clearwater and Mr. Carl Deppe, CEASE, Co-
chair, re: Comments on the Phase I Work Plan,

March 12, 1991.

P. 10.11732 -Report: Washington County CEASE Report on Work

	10.11732 Plan, prepared for Steering Committee meeting,

March 12, 1991.

P. 10.11733 -Letter to Mr. Douglas Tomchuk, Project Manager,

10.11734	U.S. EPA, Region II, from Mr. Darryl L. Decker,
Chairman, Board of Supervisors, Washington County,
re: Concerns of Government Liaison Group, March
21, 1991.

P. 10.11735 -Meeting Report: Action Items from the Steering

10.11735	Committee to the Hudson River Oversight Committee,
September 1, 1991.

P. 10.11736 -Letter to Steering Committee Member, from Ms. Ann

10.11736	Rychlenski, Steering Committee Chair, U.S. EPA,
Region II, re: October 16, 1991 Hudson River PCB
Reassessment meeting, October 1, 1991.

P. 10.11737 -Responses to questions raised at Hudson

10.11744 River PCBs Steering Committee meeting of October
16, 1991.

249


-------
10.11745 -Comments: Comments of the Steering Committee to

.10.1174 6 the Hudson River Oversight Committee, Tuesday,

October 22, 1991, Poughkeepsie, New York, prepared
by Ms. Ann Rychlenski, Chairperson, Steering
Committee, October 22, 1991.

10.11747 -Letter to Steering Committee Member, from Ms. Ann

10.11747	Rychlenski, Steering Committee Chair & Community
Relations Coordinator, U.S. EPA, Region II, re:
Community Interaction Program, August 18, 1992.

10.11748	-Presentation: Hudson River PCBs Reassessment

10.11749	Presentation to Steering Committee, prepared by
Mr. David D. Adams, Saratoga County Environmental
Management Council, July 14, 1993.

10.11750	-Letter to All Interested Parties, from Mr. Douglas

10.11750	J. Tomchuk, Project Manager, U.S. EPA, Region II,
re: Language in the Feasibility Study Scope of
Work, November 5, 1998.

10.11751	-Letter to Mr. Richard Caspe, Director, Emergency &

10.11752	Remedial Response Division, U.S. EPA, Region II,
from Mr. Richard Schiafo, Environmental Associate,
Scenic Hudson, re: Steering Committee meeting for
Hudson River PCBs Reassessment, April 23, 1999.

10.11753	-Comments: Comments on Phase I report, prepared by

10.11754	Washington County CEASE (Citizen Environmentalists
Against Sludge Encapsulation), undated.

11.0	TECHNICAL SOURCES AND GUIDANCE DOCUMENTS

11.1	EPA Headquarters

P. 11.1892 - Memorandum to Assistant Administrators, General
11.1896 Counsel, Inspector General, Associate

Administrators, Regional Administrators, Staff
Office Directors, U.S. EPA, from Ms. Carol M.
Browner, Administrator, U.S. EPA, re: Peer Review
Program, June 17, 1994. (Attachment: Report: Peer
Review and Peer Involvement at the U.S.
Environmental Protection Agency, Science Policy
Council, U.S. EPA, June 7, 1994.)

250


-------
P. 11.1897 - Memorandum to Superfund National Managers,

11.1906 Regions 1 - 10, U.S. EPA, from Mr. Stephen D.

Luftig, Director, Office of Emergency and Remedial
Response, U.S. EPA, Mr. Barry Breen, Director,
Office of Site Remediation Enforcement, OECA, U.S.
EPA, re: Implementation of Risk Assessment
Guidance for Superfund (RAGS) Volume 1 - Human
Health Evaluation Manual (Part D, Standardized
Planning, Reporting, and Review of Superfund Risk
Assessments) (Interim). (Attachments: (1) List of
RAGS Part D Workgroup Members, (2) Fact Sheet:
Frequently Asked Questions: RAGS Part D, prepared
by Office of Solid Waste and Emergency Response,
Office of Emergency and Remedial Response, U.S.
EPA, January 1998.)

P. 11.1907 - Report: Final Draft - Risk Assessment Guidance
11.1989 for Superfund(RAGS) Volume 1: Human Health

Evaluation Manual, Supplemental Guidance, Dermal
Risk Assessment, Interim Guidance, prepared by
Office of Emergency and Remedial Response, U.S.
EPA, August 11, 1999.

11.1990	- Memorandum to Assistant Administrators, Regional

11.1991	Administrators, General Counsel, Chief Financial
Officer, Inspector General, Associate
Administrators, U.S. EPA, from Ms. Carol M.
Browner, Administrator, U.S. EPA and Mr. W.

Michael McCabe, Deputy Administrator, U.S. EPA,
re: Peer Review Handbook - 2nd Edition, December
22, 2000.

11.2106 - Memorandum to Assistant Administrators, et al,
11.2238 from Ms. Carol M. Browner, Administrator, and Mr.

Fred Hansen, Deputy Administrator, U.S. EPA, re:
Peer Review Handbook, February 25, 1998.
(Attachment: Science Policy Council Handbook, Peer
Review, prepared by Members of the Peer Review
Advisory Group, a group of EPA's Science Policy
Council, prepared for U.S. EPA, January 1998.)

11.2751 - Memorandum to Regional Administrators, Regions I -
11.2760 X, from Mr. Jonathan Z. Cannon, Acting Assistant

Administrator, Office of Solid Waste and Emergency
Response, re: Notification of Out-of-State
Shipments of Superfund Site Wastes, September 14,
1989.

251


-------
11.4 Technical Sources

P. 11.0001 - E-mail (w/forwarded e-mails), to Mr. Douglas
11.0109 Tomchuk, Remedial Project Manager, U.S. EPA,

Region II, from Mr. Richard Winfield, U.S. EPA,
Region II, re: Remobilization: New Bedford Harbor:
Hot Spot - Mass Removed, April 16, 2001.
(Attachment: Report: Report on the Effects of the
Hot Spot Dredging Operations, New Bedford Harbor
Superfund Site, New Bedford, Massachusetts,
prepared by Mr. David J. Dickerson, Project
Manager, Office of Site Remediation and
Restoration, U.S. EPA, New England Region, October
1997.)

P. 11.0110 - Report: Volatilization of PCBs from Contaminated
11.0159 Sediments & Water, prepared by Mr. Steven D.

warren, Mr. Richard F. Bopp, and Mr. H. James
Simpson, Lamont - Doherty Geological Observatory
of Columbia University, prepared for Dr. Mark
Brown, New York State Department of Environmental
Conservation, October, 1987.

P. 11.0160 - Report: Bavesian Model for Fate and Transport of
11.0168 PCB in Upper Hudson River, prepared by Ms. Laura
J. Steinberg, Tulane University, Mr. Kenneth H.
Reckhow and Mr. Robert L. Wolpert, Duke
University, prepared for Journal of Environmental
Engineering, May, 1996.

P. 11.0169 - Report: Characterization of Parameters in

11.0180 Mechanistic Models: A Case Study of a PCB Fate and

	Transport Model, prepared by Ms. Laura J.

Steinberg, Tulane University, Mr. Kenneth H.
Reckhow and Mr. Robert L. Wolpert, Duke
University, prepared for Elsevier Science B.V.,
1997 .

P. 11.0181 - Report: In-Situ Anaerobic Dechlorination of
11.0522 Polvchlorinated Biphenvls in Hudson River

Sediments, prepared by Ms. Anne K. McNulty,
prepared for the Graduate Faculty of Rensselaer
Polytechnic Institute, Rensselaer Polytechnic
Institute, August 1997.

252


-------
P. 11.0523 - Report: An Integrated Model of Organic Chemical
11.0700 Fate and Bioaccumulation in the Hudson River
Estuary, prepared by Mr. Kevin J. Farley, Mr.
Robert V. Thomann, Mr. Thomas F. Cooney, III, Mr.
Darin R. Damiani, and Mr. James R. Wands,
Environmental Engineering Department, Manhattan
College, prepared for The Hudson River Foundation
March 1999.

Report: Contamination of the Hudson River, The
Sediment Record, prepared by Mr. Richard F. Bopp,
and Mr. H. James Simpson, Lamont - Doherty
Geological Observatory of Columbia University,
undated.

P. 11.0717 - Report: The Problem of Possible Systemic Effects

11.0720 from Certain Chlorinated Hydrocarbons, prepared by
Mr. Cecil K. Drinker, Ms. Madeleine Field Warren,
and Mr. Granville Bennett, Department of
Physiology, Harvard School of Public Health, and
Department of Pathology, Harvard School of
Medicine, prepared for The Journal of Industrial
Hygiene and Toxicology, September, 1937.

P. 11.0721 - Report: Summary Report on Lock 4 Dredging

11.0757 Monitoring, prepared by Mr. T.J. Tofflemire,

Bureau of Water Research, New York State
Department of Environmental Conservation,

February, 1979.

P. 11.0758 - Report: PCB Desorption from River Sediments
11.0790 Suspended During Dredging: An Analytical

Framework, prepared by Mark P. Brown, Ph.D.,

Bureau of Water Research, New York State
Department of Environmental Conservation, April,
1981.

P. 11.0791 - Report: Polvchlorobiphenvl (PCB) Congeners in

11.0803 Striped Bass (Morone Saxatilis) from Marine and
Estuarine Waters of New York State Determined by
Capillary Gas Chromatography, prepared by B. Bush,
R.W. Streeter, New York State Department of
Environmental Conservation, and R.J. Sloan, New
York State Department of Environmental
Conservation, prepared for Archives of
Environmental Contamination and Toxicology, 1989.

P. 11.0701 -
11. 0716

253


-------
P. 11.0804
11.0849

- Report: The Economic Impacts of PCB's in the

Hudson River: A Cost-Benefit Analysis, prepared by
Ms. Nicole M. Meyer, Baruch College, April 1991.

P. 11.0850 - Report: Use of Isomer Ratios to Characterize the
11.0874 Origins and Alteration State of the PCBs in 30
Species of Hudson River Fish Collected 1977-93,
prepared by Mr. John F. Brown, Jr. and Mr. George
M. Frame, II, General Electric Corporate Research
and Development, May 30, 1997.

P. 11.0875 - Report: Final Report, Effect of Migration on

11.1020 Polvchlorinated Biphenvl Concentrations in Hudson
River Striped Bass, prepared by Mr. David H.

Secor, and Mr. Joel E. Baker, Chesapeake
Biological Laboratory, University of Maryland
Center for Environmental Science, prepared for Dr.
Dennis J. Suszkowski, Science Director, Hudson
River Foundation, January 13, 1999.

P. 11.1021 - Report: Development and Evaluation of Consensus-
11.1173 Based Sediment Effect Concentrations for PCBs in
the Hudson River, prepared by MacDonald
Environmental Sciences Ltd., through Industrial
Economics Incorporated, prepared for Damage
Assessment Center, National Oceanic and
Atmospheric Administration, March, 1999.

P. 11.1174 - Report: Reproductive, Developmental and

11.1259 Immunotoxic Effects of PCBs in Fish: a Summary of
Laboratory and Field Studies, prepared by Emily
Monosson, Ph.D., prepared for Damage Assessment
Center, National Oceanic and Atmospheric
Administration, through Industrial Economics
Incorporated, March, 1999.

P. 11.1260 - Report: Final Report, the Exposure of the New York
11.1319 City Watershed to PCBs Emitted from the Hudson

River, prepared by Mr. Barry Commoner, Center for
the Biology of Natural Systems, Queens College,
CUNY, Mr. Brian Bush, School of Public Health, New
York State University at Albany, Mr. Paul Woods
Bartlett, Center for the Biology of Natural
Systems, Queens College, CUNY, Ms. Kimberly
Couchot, Center for the Biology of Natural
Systems, Queens College, CUNY, and Mr. Holger
Eisl, Center for the Biology of Natural Systems,
Queens College, CUNY, October, 1999.

254


-------
11.1320 - Report: Reproductive and Developmental Effects

11.1370	of PCBs in Fish: a Synthesis of Laboratory and
Field Studies, prepared by Emily Monosson,

Monosson Environmental Research, prepared for
Reviews in Toxicology, 1999.

11.1371	- Report: Effect of Habitat Use on PCB Body Burden

11.1378	in Hudson River Striped Bass (Morone saxatilis),
prepared by Mr. Erik R. Zlokovitz, and Mr. David
H. Secor, Chesapeake Biological Laboratory,
University of Maryland Center for Environmental
Science, prepared for Canadian Journal of Fishery
and Aquatic Science, 1999.

11.1379	- Letter to Mr. Douglas J. Tomchuk, Remedial Project

11.1482	Manager, Emergency and Remedial Response Division,
U.S. EPA, Region II, from Mr. Robert G. Gibson,
Engineering Project Manager, GE Corporate
Environmental Programs, General Electric Company,
re: Environmental Dredging Report, August 25,
2000. (Attachment: Report: Environmental
Dredging: An Evaluation of Its Effectiveness in
Controlling Risks, prepared by General Electric
Company Corporate Environmental Programs,

Blasland, Bouck & Lee, Inc., and Applied
Environmental Management, Inc., August, 2000.)

11.1483	- Report: A Risk Management Strategy for PCB-

11.1887	Contaminated Sediments, prepared by National
Research Council, March 26, 2001.

11.1888	- Report: Polvchlorinated Biphenvls and Endocrine

11.1889	Bio-Markers in Fish from the Hudson River, New
York, USA, prepared by Mr. Barry P. Baldigo,

United States Geological Survey, Mr. Ronald J.
Sloan, New York State Department of Environmental
Conservation, Mr. Steven B. Smith, United States
Geological Survey, and Mr. Dennis P. Keane, New
York State Department of Environmental
Conservation, undated.

11.1890	- Letter to James Cogliano, Ph.D., Chief,

11.1891	Quantitative Risk Methods Group, National Center
for Environmental Assessment, U.S. EPA, from
Thomas M. Mack, M.D., Department of Preventive
Medicine, USC/Norris Comprehensive Cancer Center,
University of Southern California, re: Review of

255


-------
Kimbrough et al paper on the PCB exposure cohort,
undated.

P. 11.1992 - Press Release: AIHC Supports Use of Mode-of-

	11.1993 Action Approach When Complete, Mechanistic Data

Are Lacking, prepared by American Industrial
Health Council, March 26, 1999.

P. 11.1994 - Report: Determining Modes of Action for

	11.2011 Biologically Based Risk Assessments, prepared by

American Industrial Health Council, March 1999.

P. 11.2012 - Report: Two Dimensional Monte Carlo Simulation and

	11.2032 Beyond: A Comparison of Several Probabilistic Risk

Assessment Methods Applied to a Superfund Site,
prepared by Ted W. Simon, prepared for Human and
Ecological Risk Assessment, U.S. EPA, 1999.

P. 11.2033 - Report: Does the Use of Monte Carlo Methods in

	11.2035 Risk Assessment Add Value? A Case study of the

Sangamo-Weston/Lake Hartwell Site, prepared by Ted
W. Simon, Ph.D., D.A.B.T., Toxicologist, U.S. EPA,
undated, facsimile date August 2, 1999.

P. 11.2036 - Report: Modeling Resuspension of River Sediments

	11.2041 using ARC/INFO, prepared by Mr. Theodore A.D.

Slawecki, Mr. Ramesh K. Raghunathan, Mr. Victor J.
Bierman, Jr., and Mr. Paul W. Rodgers, Limno-Tech,
Inc., 07/08/96.

P. 11.2042 - Report: Draft White Paper on the Nature and Scope

	11.2105 of Issues on Adoption of Model Use Acceptability

	Guidance, prepared by The Science Policy Council,

Model Acceptance Criteria and Peer Review White
Paper Working Group, December 1998.

P. 11.2239 - Report: Studies of Employees Occupationally

11.2471 Exposed to PCBs, A Progress Report, prepared by
Richard W. Lawton, M.D. (1); Barbara T. Sack,
B.S.(l), Marie R. Ross, R.N.(2); Joseph Feingold,
M.D.(2); John F. Brown, Jr., Ph.D.(1); John A.
Bergeron, Ph.D.(1). 1-General Electric Research
and Development Center; 2-General Electric
Capacitor Products, September 18, 1981.

P. 11.2472 - Article: Polychlorinated Biphenyl (PCB)

11.2475 Partitioning Between Adipose Tissue and Serum,

prepared by John F. Brown, Jr., Ph.D. and Richard

256


-------
W. Lawton, M.D., General Electric Research and
Development Center, 1984.

P. 11.2476 - Article: Comparability and Precision of Serum PCB
11.2484 Measurements, prepared by Richard W. Lawton, M.D.,
John F. Brown, Jr., Ph.D., General Electric
Research and Development Center, and Marie R.
Ross, R.N., C.O.H.N., Joseph Feingold, M.D.,
General Electric Company, January/February 1985,
Vol. 40, (No. 1).

P. 11.2485 - Article: Effects of PCB Exposure on Biochemical
11.2504 and Hematological Findings in Capacitor Workers,
prepared by Richard W. Lawton, M.D., John F.

Brown, Jr., Ph.D., General Electric Research and
Development Center; Marie R. Ross, R.N., General
Electric Company, and Joseph Feingold, M.D.,
published by Environmental Health Perspectives,
Vol. 60, pp. 165-184, 1985.

P. 11.2505 - Article: Persistence of PCB Congeners in Capacitor
11.2510 Workers and Yusho Patients, prepared by J.F.

Brown, Jr., R. W. Lawton, M.R. Ross, J. Feingold,
R.E. Wagner, and S.B. Hamilton, General Electric
Research and Development Center, published by
Chemosphere, Vol. 19, Nos. 1-6, pp. 829-834, 1989.

P. 11.2511 - Article: Human Body Burden of Polychlorinated

11.2520 Dibenzofurans Associated with Toxicity Based on
the Yusho and Yucheng Incidents, prepared by Mr.
John J. Ryan, Mr. Thomas A. Gasiewicz, and John F.
Brown, Jr., Ph.D., published by Society of
Toxicology 1990.

P. 11.2521 - Letter to Mr. Douglas Tomchuk, Remedial Project
11.2534 Manager, U.S. EPA, Region II, from Mr. Robert G.

Gibson, Engineering Project Manager, Hudson River
Project, General Electric Company, re: Hudson
River PCB Fate Model Manuscript, November 10,
2000. (Attachment: Article: A Model of PCB Fate
in the Upper Hudson River, published by
Environmental Science & Technology, Vol. 34, No.
19, 2000.)

Report: Niagara River Biota Contamination
Project: Fish Flesh Criteria for Piscivorous
Wildlife, prepared by New York State Department of
Environmental Conservation, July 1987.

P. 11.2535 -
	11.2725

257


-------
P. 11.2726 - Paper Summary: Toxic Constituent Losses During
11.2739 Dredging of Contaminated Sediments, prepared by
Donald F. Hayes, Ph.D., P.E., Civil &

Environmental Engineering, University of Utah,
prepared for EPA Superfund Workshop on
Contaminated Sediments, Alexandria, VA, May 30-
June 1, 2001.

P. 11.2740 - Paper Summary: Simple Approach to TSS Source

	11.2750 Strength Estimates, prepared by Donald Hayes,

Ph.D., P.E., Civil & Environmental Engineering,
University of Utah and Mr. Pei-Yao Wu, Graduate
Research Assistant, Civil & Environmental
Engineering, University of Utah, prepared for WEDA
XXI Conference, Houston, TX, June 25-27, 2001.

P. 11.2761 - Journal: Northeastern Environmental Science,
11.2856 Volume 8/ Number 1/ 1989.

P. 11.2857 - Paper Summary: Environmental Effects of Dredging,

	11.2865 Technical Notes, prepared by U.S. Army Engineer

Waterways Experiment Station, March 1996.

P. 11.2866 - Paper Summary: Potential Health Risks of

	11.2869 Recreational Fishing in New York City, Volume 1,

Number 5, prepared by Mr. Andre M. Ramos, BS,
Albert Einstein College of Medicine and Ellen F.
Crain, Ph.D., MD, Department of Pediatrics, Jacobi
Medical Center, September-October 2001.

P. 11.2870 - Letter (w/attachment) to Mr. Clay Hiles,

11.2916 Executive Director, Hudson River Foundation, from
Dr. Joel E. Baker, Professor, University of
Maryland, re: White paper entitled PCBs in the
Upper Hudson River: The Science Behind the
Dredging Controversy, October 25, 2001.

P. 11.2917 - Paper Summary: On the Vertical Distribution of

	11.2933 Oligochaetes in Lake Sediments, prepared by Mr.

Goran Milbrink, Institute of Freshwater Research,
Drottningholm Institute of Zoology, University of
Uppsala, Sweden, undated.

P. 11.2934 -Literature from Geovation Technologies, Inc.,
11.2949 2000.

258


-------
11.2950 -Letter to The Honorable George Pataki, Governor
11.2955 the State of New York, from Mr. Tadeusz

A.J.E. Czolowski, Vice Chairman and CEO, Tamco,
Inc., re: PCB treatment - Hudson River, December
23, 2000.

of

11.2956 -Memorandum (w/attachments) to Ms. Alison Hess and
11.2961 Mr. Douglas Tomchuk, U. S. EPA, Region II from

Mickey S. Cox, Huma-Clean, L.L.C., re: Discharge
into Hudson River, January 2, 2001.

11.2962	-Letter (w/attachment) to Ms. Alison Hess, U. S.

11.2963	EPA, Region II, from Mr. Jay Silverstein,

President, Enviro-zyme International, Incorporated,
re: "M", Microorganisms for the Degradation of
Polychlorinated Biphenyls and Polynuculear Aromatic
Hydrocarbons, February 27, 2001.

LIST OF QA/QC PACKAGES FOR DATA UTILIZED
IN THE REASSESSMENT RI/FS AND MISCELLANEOUS DATA

Due to their voluminous nature, the following data packages
are incorporated by reference into the Hudson River PCBs
Reassessment RI/FS Administrative Record. This data is primarily
raw environmental sampling data and related data "quality
assurance/quality compliance" packages. In general, this data
has been presented in summary form elsewhere in the
Administrative Record. The majority of such summary data may be
found in the Compact Disk: Database for the Hudson River PCBs
Reassessment RI/FS, Release 5.0, prepared by TAMS Consultants,
Inc., prepared for U.S. EPA, Region II, October 2000. (Note:

This database can be found in Hudson River PCBs Administrative
Record, Update #5, p. 305689-305689). The data packages are
available at the EPA Region II Superfund Remedial Records Center,
290 Broadway, 18th Floor, New York, NY 10007. Contact: (212) 637-
4308 .

A.	Report, 1998 Upper Hudson River Sediment Coring Program,
prepared by O'Brien and Gere, prepared for General Electric
Co, December 1998.

B.	Law 1990 Fish Sample Reanalvsis OA/OC Package, prepared by
Northeast Analytical, prepared for O'Brien and Gere,
prepared for General Electric Co, Winter 1996.

C.	Report, Fort Edward Dam PCB Remnant Containment, 1994 Post-
Construction Remnant Deposit Monitoring Program, prepared by

259


-------
O'Brien and Gere, prepared for General Electric Co, August

1995.

D.	Report, Fort Edward Dam PCB Remnant Containment, 1995 Post-
Construction Remnant Deposit Monitoring Program, prepared by
O'Brien and Gere, prepared for General Electric Co, July

1996.

E.	Report, Fort Edward Dam PCB Remnant Containment, 1996 Post-
Construction Remnant Deposit Monitoring Program, prepared by
O'Brien and Gere, prepared for General Electric Co, March
1998 .

F.	Report, Fort Edward Dam PCB Remnant Containment, 1997 Post-
Construction Remnant Deposit Monitoring Program, prepared by
O'Brien and Gere, prepared for General Electric Co, November
1998 .

G.	Report, Hudson River Project 1998 Upper Hudson River Water
Column Monitoring Program, prepared by O'Brien and Gere,
prepared for General Electric Co, October 1999.

H.	Report, Hudson River Project Monitoring Program 1999 Summary
Report, prepared by QEA, prepared for General Electric Co,
January 2001.

I.	QA/QC Packages for EPA Region II Phase II Sampling, prepared
by Gradient Corp., 1995-1996.

J. Data Package, Rogers Island Sampling, prepared by Severn
Trent Laboratories, prepared for TAMS, prepared for EPA,
August 1999.

K. Data for: Report: Effects of the Health Advisory and

Advisory Changes on Fishing Habits and Fish Consumption in
New York Sport Fisheries, prepared by Ms. Nancy A. Connelly,
Human Dimensions Research Unit, Department of Natural
Resources, College of Agriculture and Life Sciences, Cornell
University, Ms. Barbara A. Knuth, Human Dimensions Research
Unit, Department of Natural Resources, College of
Agriculture and Life Sciences, Cornell University, and Ms.
Carole A. Bisogni, Division of Nutritional Sciences, College
of Human Ecology, Cornell University, prepared for New York
Sea Grant Institute, September 1992 (Note: This report can
be found in Hudson River PCBs Administrative Record, Update
#10, pp. 800857-800993.) (Note: This data is confidential,
proprietary information. EPA has a copy of this data in the
confidential portion of the Administrative Record. Members

260


-------
of the public who desire a copy of the data should contact
Nancy Connelly, 124 Fernow Hall, Cornell University, Ithaca,
NY 14853, 607-255-2830. There is a fee charged for the
data.)

L. Report, Fort Edward Dam PCB Remnant Containment, 1993 Post-
Construction Remnant Deposit Monitoring Program, prepared by
O'Brien and Gere, prepared for General Electric Co, April
1994 .

M. Report, Fort Edward Dam PCB Remnant Containment, 1992 Post-
Construction Remnant Deposit Monitoring Program, prepared by
O'Brien and Gere, prepared for General Electric Co, August
1993.

N. Report, Fall 1990 Hudson River Monitoring Program, prepared
by O'Brien and Gere, prepared for General Electric Co, June
1991.

VIDEO

The following videos are included in the Hudson River PCBs
Reassessment RI/FS Administrative Record. The corresponding
Administrative Record Index section for each video is noted. The
originals of the videos are available at the EPA Region II
Superfund Remedial Records Center, 290 Broadway, 18th Floor, New
York, NY 10007. Contact: (212) 637-4308.

1.	Video, PCB Contamination in the Hudson Valley: A Victimless
Crime?, Parts 1-5, Hudson River Sloop Clearwater, February
7, 2001 (10.1 - Comments and Responses - Video)

2.	Video, The Hudson River Project, a Message from GE, General
Electric Company, January 28, 2001 (10.1 - Comments and
Responses - Video)

3.	Video, Big Sky Editorial, General Electric Company/BBD&O,
April 2, 2001 (10.1 - Comments and Responses - Video)

4.	Video, Post-capping Revegetation Inspection of GM-Massena
Superfund Site, General Motors, 1996 (11.4 - Technical
Sources - Video)

5.	Video, Environmental Dredging, U.S. EPA Region II/ERTV, Fall
2000 (11.4 - Technical Sources - Video)

261


-------
6. Video, GE Hudson Falls Pumphouse IRM, New York State

Department of Environmental Conservation, August 1998 (11.4
- Technical Sources - Video)

INCORPORATION OF EPA GUIDANCE AND OTHER REFERENCE MATERIALS

Documents cited in the "Reference" sections of reports,
studies and similar documents for the Hudson River PCBs Superfund
Site Reassessment RI/FS (including, for example, scope of work
reports, remedial investigation reports, responsiveness
summaries, peer review reports, the December 2000 Feasibility
Study and Record of Decision responsiveness summary) which are
not listed in the Hudson River PCBs Superfund Site Administrative
Records Index are incorporated herein by reference. The
documents so incorporated include, but are not limited to,
technical reports and studies, legal citations, EPA guidance
(including handbooks, remediation strategies and similar guidance
documents), and other government reports, studies and documents
which are publicly available. For further information on
reviewing or obtaining copies of such documents, please contact
the EPA Region II Superfund Remedial Records Center, 290
Broadway, 18th Floor, New York, NY 10007. Contact: (212) 637-
4308 .

EPA GUIDANCE

In addition to the EPA guidance incorporated by reference
above, the following guidance was considered by EPA with respect
to the Record of Decision for the Hudson River PCBs Superfund
Site Reassessment RI/FS:

1.	United States Environmental Protection Agency, Final
Guidance on Administrative Records for Selecting CERCLA
Response Actions, OSWER Dir. No. 9833.3A-1, December 3, 1990

2.	United States Environmental Protection Agency, Peer Review
Handbook, Office of Science Policy, Office of Research and
Development, EPA 100-B-00-001, December 2000

3.	United States Environmental Protection Agency, Comprehensive
Five-Year Review Guidance, OSWER Dir. No. 9355.7-03B-P, June
2001

262


-------