EPA NEW ENGLAND
QUALITY ASSURANCE
PROJECT PLAN PROGRAM GUIDANCE



PROf^S

U.S. EPA NEW ENGLAND

Quality Assurance Unit
Office of Environmental Measurement and Evaluation

April 2005


-------
Preface

The EPA New England Quality Assurance Unit implements a Quality Assurance Project Plan
(QAPP) Program in accordance with EPA Order 5360.1 A2, May 2000. Among other
requirements, the "QA Order" requires the development, review and approval of QAPPs for all
environmental data operations performed by or for EPA. The term "environmental data
operations" refers to activities involving the collection, generation, compilation, analysis,
evaluation and use of environmental data. The EPA New England Quality Assurance Project
Plan Program Guidance document implements national QAPP requirements specified in EPA
Requirements for Quality Assurance Project Plans (EPA QA/R-5), and th eEPA Quality Manual
for Environmental Programs, 5360 Al.

As a regional implementation document, the EPA New England Quality Assurance Project Plan
Program Guidance

•	Outlines a regional planning process to ensure project quality objectives are
systematically identified

•	Defines a minimum set of project QA/QC activities that must be described in a
QAPP to ensure that data collected by or for EPA New England are of known and
documented quality and can be used in environmental decision making

•	Describes the roles and responsibilities of project management and personnel

i


-------
Guidance

Program

General	EPA Guidance for Quality Assurance Project Plans (EPA QA/G-5),

December 2002, EPA/240/R-02/009,
http://www.epa.gov/qualitv/qa docs.html

Water Quality
Monitoring

Wadeable Streams
and Rivers

Brownfields

Hazardous Waste
(Federal Facilities,
Superfund, and
RCRA)

Air

Pesticides

The Volunteer Monitor's Guide to Quality Assurance Project Plans,
September 1996, EPA/841/B-96/003,

http://epa.gov/owow/monitoring/volunteer/qapp/vol qapp.pdf

Generic Quality Assurance Project Plan Guidance for Programs Using
Community Level Biological Assessments in Wadeable Streams and
Rivers, http://www.epa.gov/bioindicators/html/qapp.html

Quality Assurance Guidance for Conducting Brownfields Site
Assessments, September 1998, EPA 540-R-98-038,
http://www.epa.gov/swerosps/bf/pdf/bfqag4.pdf

Uniform Federal Policy for Quality Assurance Project Plans, July 2004,
OSWER Directive 9272.0-17

http://www.epa.gov/fedfac/pdf/ufp manualvl iuly04.pdf

Ambient Monitoring Technology Information Center
http ://www. epa. gov/ttn/amtic/

Guidance for Quality Assurance Project Plans-Development for EPA
Funded Cooperative Agreements with State and Tribal Agencies for the
Conduct ofFIFRA Pesticide Programs, December 15, 2000
http://www.epa.gov/region9/qa/pdfs/finalqaappver9.pdf

li


-------
Table of Contents

1.0	INTRODUCTION	2

2.0	SCOPE	3

3.0	REQUIRED QAPP ELEMENTS	3

4.0	ROLES AND RESPONSIBILITIES	5

5.0	QAPP REVIEW AND APPROVAL	6

6.0	IMPLEMENTATION OF APPROVED QAPP	7

7.0	REVISION AND MODIFICATION OF APPROVED QAPP	7

8.0	QAPP ARCHIVAL	8

9.0	REFERENCES	9

EPA New England QAPP Program Guidance
Revision 4/05

1


-------
EPA NEW ENGLAND
QUALITY ASSURANCE PROJECT PLAN PROGRAM GUIDANCE

1.0 INTRODUCTION

A quality assurance project plan (QAPP) is a required planning document that provides a
"blueprint" for obtaining the type, quantity and quality of data needed to support environmental
decision making. The QAPP documents all quality assurance (QA), quality control (QC) and
technical activities and procedures associated with planning, implementing and assessing
environmental data operations, Figure 1.



Figure 1. Life Cycle of an Environmental Data Operation

EPA New England (EPA NE) recognizes the following two types of QAPPs:

1.	"Project-specific QAPPs" provide a QA blueprint specific to one project or task. Project-
specific QAPPs are used when projects are limited in scope and time and, in general, can
be considered the sampling and analysis plan/workplan for the project.

2.	"Generic program QAPPs" provide an overarching plan that describes a program's quality
objectives and document the comprehensive set of sampling, analysis, QA/QC, data
review, and assessment procedures specific to one program or group. In contrast to the
project-specific QAPP, the generic program QAPP serves as an umbrella under which
multiple project-specific tasks may be conducted over an extended period of time. Project
or task-specific information, not covered by the umbrella, is documented in detailed
sampling and analysis plans/workplans, which use the generic program QAPP as an
informational reference.

EPA New England QAPP Program Guidance
Revision 4/05

2


-------
EPA Order 5360.1 A2 requires that a QAPP be prepared and approved for all environmental data
operations performed by or for EPA prior to the initiation of those data operations. In addition to
the QAPP requirement, this Order mandates that quality systems be in place to support the
development, review, approval, implementation and assessment of data operations and to ensure
that environmental technologies are designed, constructed, and operated according to defined
expectations. EPA NE designates those organizations performing work for or on behalf of EPA as
"Lead Organizations." Lead Organizations include organizations performing work under financial
assistance agreements and in response to voluntary, consentual or unilateral enforcement
agreements, decrees and orders. Lead Organizations are required to develop, operate and
document their quality system in quality management plans (QMPs) to ensure that environmental
data collected and used by the Agency are of known and documented quality and are suitable for
their intended use.

Guidance for developing quality systems is provided in Quality Systems for Environmental Data
and Technology Programs - Requirements with Guidance for Use, American National Standard,
(ANSI/ASQ E4 - 2004) February 2004; EPA Requirements for Quality Management Plans, EPA
QA/R-2, March 2001; and EPA Quality Manual for Environmental Programs, 5360 Al, May 5,
2000.

2.0 SCOPE

The EPA New England Quality Assurance Project Plan Program Guidance (hereafter referred to
as the EPA NE QAPP Program) is based on Agency requirements as outlined in EPA
Requirements for Quality Assurance Project Plans, EPA QA/R-5, March, 2001. The EPA NE
QAPP Program provides the framework for all project-specific and generic program QAPPs. It is
a companion guidance to other documents written by the EPA NE Quality Assurance Unit which
are available at http://epa.gov/ne/lab/qa/qualsys.html. These documents form the basis of the EPA
NE quality system that supports the generation, collection and use of scientifically defensible data.
Program-specific QAPP guidance documents, listed on page ii, should be used when so directed by
the environmental program office. General QAPP guidance is provided in EPA Guidance for
Quality Assurance Project Plans, EPA QA/G-5.

Since the content and level of detail in individual QAPPs will vary according to the work being
performed and the intended use of the data, EPA NE supports a "graded approach" when preparing
QAPPs. In other words, the amount of documentation and level of detail will vary based upon the
complexity and cost of the project. Appropriate consideration should be given to the significance
of the environmental problem to be investigated, the environmental decision to be made, and the
impact on human health and the environment.

3.0 REQUIRED QAPP ELEMENTS

In accordance with EPA QA/R-5, there are four basic element groups that must be addressed in a
QAPP, as depicted in Figure 2. In order to piece these interrelated element groups together to
meet project objectives, a systematic planning process, similar to the one outlined in Figure 3,
should be used to determine project tasks and to select technical and QA/QC activities.

EPA New England QAPP Program Guidance
Revision 4/05

3


-------
Assessment/Oversight

This element group details the oversight
activities that will be conducted to ensure proper
implementation of the project plan. It also
describes the assessments that will be conducted
to identify and correct problems and describes
minimum requirements for QA Reports to
management and Final Project Reports.

Project Management and Objectives

This element group provides the purpose and
background of the project and describes the project
quality objectives. It also identifies the roles and
responsibilities of project personnel, describes
communication procedures, and details the proposed
project schedule.

Data Validation and Usability

This element group details the review activities
that will be performed to ensure that the
collected data are scientifically defensible, of
known quality, and can support project
objectives. All enviromnental data collected by
or for EPA NE must be reviewed and the
limitations of those data determined prior to use.

Measurement/Data Acquisition

This element group describes the design and
implementation of all measurement systems that will
be used to collect data. It details sampling, data
generation and documentation procedures. All quality
control samples, including their frequency
requirements, acceptance criteria, and corrective
action procedures, associated with methods/procedures
are documented. In addition, when previously
collected data will be used, the acceptance criteria for
those "secondary" data are described.

Figure 2. Required QAPP Element Groups

Specific requirements for each element group are detailed in program-specific QAPP guidance
documents listed on page ii. If some or all of the required QAPP elements are incorporated into
other planning documents (i.e., Sampling and Analysis Plans [SAPs], Field Sampling Plans
[FSPs], Field Operations Plans [FOPs], Project Operations Plans [POPs] or general Project
Workplans [WPs]), then a cross-reference table should be provided to identify where the required
QAPP elements are located. The referenced SAP, FSP, etc., should be identified with the
document title, date, section number, and page numbers.

EPA New England QAPP Program Guidance
Revision 4/05

4


-------
4.0 ROLES AND RESPONSIBILITIES

Lead Organization

The Lead Organization is responsible and accountable for all phases of the project. The Lead
Organization may perform the project work directly or contract for field sampling, analytical, data
validation, data usability assessment, and oversight assessment services.

The Lead Organization is responsible for ensuring that there is an approved QAPP in place prior to
beginning any environmental data operation. Also, the Lead Organization is responsible for
ensuring that organization personnel, contractors and/or subcontractors perform project work as
prescribed in the approved QAPP. To that end, Lead Organizations should plan and conduct
oversight assessments, such as technical system audits (TSAs), of project activities.

Lead Organizations may include the following:

EPANE

•	Other Federal agencies under interagency agreements, Federal facility agreements, and
memoranda of understanding (MOUs) with EPA NE

•	States, tribes and local governments under financial assistance agreements with EPA,
including grants and cooperative agreements

•	Non-profit organizations under financial assistance agreements with EPA NE, including
institutions of higher education, hospitals, volunteer organizations, and interstate associations

•	Regulated facilities (e.g., potentially responsible parties) under voluntary or enforcement
consent decrees, agreements and orders with EPA NE

Project Manager

The project manager is responsible for directing, coordinating, and overseeing all project activities
for the Lead Organization. He/she is responsible for submitting the QAPP, QAPP amendments,
revisions and annual review letters to appropriate personnel, with sufficient lead time, for review
and approval. QAPPs should be submitted to EPA NE for review and approval no less than 30
days in advance of the scheduled environmental data operation. The project manager ensures that
all technical issues identified during QA review are satisfactorily addressed and documented prior
to beginning of field work. Refer to Figure 4 for an outline of the QAPP development process.

Project Team

The project manager assembles a project team consisting of technical personnel including data
generators, QA scientists, and data users to plan the project. The size of the project team should
reflect the complexity of the project. For example, small volunteer monitoring projects may have
project teams comprised of only two or three people.

Planning (scoping) meetings are convened to identify the project objectives; environmental
decisions that will be made with the collected data; project action limits; type and quantity of data;

EPA New England QAPP Program Guidance
Revision 4/05

5


-------
and how "good" the data must be (the data quality) to support the decisions that will be made. The
project team defines the quality of the data by setting acceptability limits for the project, otherwise
known as measurement performance criteria. Once the measurement performance criteria have
been decided upon, the project team can select sampling and analytical methods that have
appropriate quantitation limits and quality control limits to achieve project objectives.

The project team is responsible for compiling project information as defined in the program-
specific QAPP guidance (page ii) and for resolving all technical issues prior to the preparation of
the QAPP document. Ultimately, it is the responsibility of the project team, and not the
QAPP preparer alone, to design a QA "blueprint" that meets project objectives.

The QAPP should be written by members of the project team experienced in many aspects of
environmental science including chemistry, engineering, hydrogeology and risk assessment. In
addition, they should be familiar with the sample collection procedures, analytical methods and
data review and assessment procedures that will be used for the project.

Project Personnel

An organizational chart, or detailed discussion, should clearly indicate the reporting relationships
between EPA NE and project personnel, including contractors and subcontractors. All project
personnel are responsible for reading and understanding the QAPP before beginning field work,
and for implementing the QAPP as prescribed.

EPA NE QA Unit

The EPA NE QA Unit is responsible for reviewing and approving all intramural and extramural
QAPPs, except in the case where the review and approval authority has been delegated by the EPA
NE regional quality assurance manager (RQAM) in accordance with Section 5.2.

Members of the QA Unit are available to provide assistance and QA/QC guidance during the
planning and implementation of environmental projects. In addition, they perform technical
system audits and data review activities.

The QA Unit is also responsible for identifying the QA/QC training needs for the region, including
project planning and QAPP training, and for conducting assessments of environmental programs.

5.0	QAPP REVIEW AND APPROVAL

5.1	Internal Review and Approval

The Lead Organization is responsible for ensuring that the QAPP includes all required QAPP
elements and information and that project quality objectives (PQOs), technical activities and
supporting QA/QC will result in data of known and documented quality that can be used in
environmental decision making. To that end, the Lead Organization should review the QAPP and
require that all project personnel, contractors, and subcontractors review applicable sections of the
QAPP to ensure technical accuracy prior to submitting the QAPP to EPA NE for approval.

EPA New England QAPP Program Guidance
Revision 4/05

6


-------
5.2 EPA NE Review and Approval

As specified in EPA Order 5360.1 A2, EPA NE must review and approve all intramural and
extramural QAPPs before environmental data operations can begin. To that end, a technical
review is performed by the QA Unit and the project officer/project manager to ensure that project
quality objectives, technical tasks, and supporting QA/QC activities will result in data of known
and documented quality that can be used in making environmental decisions. All comments
provided by EPA NE must be acceptably addressed in writing before environmental data
operations can begin. The response document (either a revised QAPP or letter responding to
specific deficiencies) should provide identifying information, as it is presented on the "title and
approval page" of the original QAPP.

In accordance with the QA Order, the RQAM has delegated QAPP approval authority to the
Superfund and RCRA Corrective Action Programs within EPA NE, as described in Appendix 12
of the EPA NE QMP. As a condition of this delegated authority, the program is required to
provide to the QA Unit a copy of the "title and approval page" for each approved QAPP.

The RQAM may also delegate QAPP approval authority to non-EPA organizations in conjunction
with the EPA NE environmental program(s). Delegation of this approval authority is contingent
upon having an EPA-approved QMP and an effectively implemented quality system.

6.0 IMPLEMENTATION OF APPROVED QAPP

The approved QAPP must be implemented as prescribed; however, the QAPP may be modified at
any time after undergoing the proper approval process, to ensure project objectives are met.

7.0	REVISION AND MODIFICATION OF APPROVED QAPP

QAPPs are approved for a fixed period of time specific to the environmental data operation. They
must be kept current and revised whenever necessary and when so directed by EPA NE or national
program office.

7.1	Modification of Approved QAPP

When procedures or project activities need to be modified to achieve project quality objectives, the
QAPP must be amended (e.g., change of sampling locations, methods, matrices, QC samples).

This amendment must be reviewed and approved in the same manner as the original QAPP. The
amendment should contain complete identifying information, as presented on the original QAPP
title and approval page, with updated signatures and dates. Amendments should be approved
before changes are implemented.

Verbal approval of modifications may be obtained to expedite project work. Descriptions of
modifications and verbal approvals must be documented in telephone logs or emails which are
retained in the project file. Subsequently, this verbally approved modification must be
documented in an amendment to the QAPP and submitted to EPA NE within seven working days,
or on a mutually agreed upon date, for formal signature approval.

EPA New England QAPP Program Guidance
Revision 4/05

7


-------
Note that when "minor" changes are made to a QAPP (e.g., extending the monitoring period,
adding a sampling station), approved amendments are not required. Instead, EPA should be
notified by email of all changes and a letter documenting the changes or revised QAPP pages
should be sent as a follow up.

7.2 Annual Review of Approved QAPP

Approved QAPPs must be reviewed annually by the Lead Organization, and this annual review
should be documented in a letter to the EPA NE RQAM. The annual review letter should describe
all changes to the QAPP and/or include revised QAPP pages. If extensive revisions are necessary,
greater than ten pages, then a revised QAPP document should be submitted.

8.0 QAPP ARCHIVAL

All QAPPs, reviewers' comments, and responses to reviewers' comments (revised QAPPs, QAPP
amendments, and response letters addressing specific issues) must be archived in the appropriate
project/program file according to the procedures specified by the Lead Organization in the QAPP
and/or their QMP.

Project files must be retained for the period of time specified in the interagency agreement, MOU,
cooperative agreement, financial assistance agreement, contract, or voluntary or enforcement
consent decree, agreement or order.

EPA NE retains the authority to request project/program files for any extramural project/program
during the period of performance of the extramural agreement.

EPA New England QAPP Program Guidance
Revision 4/05

8


-------
REFERENCES

Quality Systems for Environmental Data and Technology Programs - Requirements with
Guidance for Use, American National Standard, (ANSI/ASQ E4 -2004), February 2004

EPA Requirements for Quality Management Plans, March 2001, (EPA QA/R-2)
EPA/240/B-01/002, http://www.epa.gov/qualitv/qs-docs/r2-final.pdf

Overview of the EPA Quality System for Environmental Data and Technology, November
2002, EPA/240/R-02/003, http://www.epa.gov/qualitv/qs-docs/overview-final.pdf

March 2, 1999 Memorandum From Norine E. Noonan (AA) to Assistant Administrators
and Regional Administrators Re: Clarification of Terminology for the EPA Quality System
with attachments

EPA Requirements for Quality Assurance Project Plans, March 2001, (EPA QA/R-5),
EPA/240/B-01/003, http://www.epa.gov/qualitv/qs-docs/r5-final.pdf

EPA Guidance for Quality Assurance Project Plans, December 2002, (EPA QA/G-5),
EPA/240/R-02/009, http://www.epa.gov/qualitv/qs-docs/g5-final.pdf

Guidance for the Data Quality Objective Process, EPA/600/R-98/018, February 1998,
(EPA QA/G-4), EPA/600/R-96/055, http://www.epa.gov/qualitv/qs-docs/g4-final.pdf

EPA New England Quality Management Plan, May 5, 2005
http: //epa. gov/ne/1 ab/q a/qual sv s. html

Region 1, EPA-NE Data Validation Functional Guidelines for Evaluating Environmental
Analyses, December 1996, http://epa. gov/ne/1 ab/qa/qualsvs.html

Region 1, EPA NE Assessment Program, February 2002.

Guidance for the Preparation of Standard Operating Procedures for Quality-Related
Operations, November 1995, (EPA QA/G-6), EPA/600/R-96/027,
http://www.epa.gov/qualitv/qs-docs/g6-final.pdf

Guidance for Data Quality Assessment: Practical Methods for Data Analysis, July 2000
(EPA QA/G-9), EPA/600/R-96/084, http://www.epa.gov/qualitv/qs-docs/g9-final.pdf

National Enforcement Investigations Center (NEIC) Policies and Procedures,
EPA-330/9-78-001-R, May 1978, Rev. December 1981 NTIS: 1-800-553-6847

Implementation of Quality Assurance Requirements for Organizations Receiving EPA
Financial Assistance http://www.epa.gov/ogd/qa.htm

EPA New England QAPP Program Guidance
Revision 4/05


-------
Figure 3. EPA NE Systematic Planning Process

Project Quality
Objectives

Develop Project Schedule

-	Identify resource and/or time limitations

-	Identify regulatory requirements and/or restrictions

-	Identify seasonal sampling restrictions

Determine "Type" of Data Needed

-	Identify target analytes/contaminants of concern and
concentration levels

-	Select analytical parameters/groups

-	Determine appropriateness of field screening, on-site
analytical and/or off-site fixed laboratory techniques
^Evaluate appropriateness of sampling techniques

Determine "Quality" of Data Needed

- Establish project sampling/analytical measurement
performance criteria (MPC) for precision, accuracy/bias,
sensitivity (quantitation limits), comparability,
rpresentativeness and completeness

Determine "Quantity" of Data Needed

- Determine the number of samples needed for each analytical
parameter/matrix/concentration level

f Determine Data
Review
T Requirements and
Criteria

-To ensure that data
I are scientifically sound

and that only data
Imeeting project criteria
'twill be used to support
environmental
decisions

Obtain Services
of Data Review
and Validation
Group

EPA New England QAPP Program Guidance
Revision 4/05

10


-------
Figure 3

EPA New England QAPP Program Guidance
Revision 4/05

11


-------
Environmental Problem

T

Assign project manager, assemble project team
Schedule and conduct planning meeting

T"

Plan project, determine project objectives and tasks, and select methods

T"

Prepare project-specific or generic QAPP
Perform internal review, and submit QAPP for external approval
Revise QAPP as required

QAPP Approved

T

Implement QAPP as written

T

Amend QAPP as needed, and submit amendments for approval

T"

Review QAPP annually,

Revise QAPP as necessary, when directed by EPA NE or national program office

!

Archive QAPP in accordance with records retention policy

Figure 4. Life Cycle of a QAPP

EPA New England QAPP Program Guidance
Revision 4/05