Revision 0 - 11/02/01

ElV

Concurrent
(JTC ^^5 Technologies
Corporation

U.S. Environmental Protection Agency
Environmental Technology Verification Program
For Metal Finishing Pollution Prevention Technologies

Verification Test Plan
for the

Evaluation of the Kaselco Electrocoagulation Treatment System

Revision 0

November 2, 2001

Concurrent Technologies Corporation is the Verification Partner for the EPA I'JV Metal
Finishing Pollution Prevention Technologies Center under EPA Cooperative Agreement

No. CR826492-01-0.


-------
Revision 0 - 11/02/01

ejY

CPC

Concurrent

Technologies

Corporation

U.S. Environmental Protection Agency
Environmental Technology Verification Program
For Metal Finishing Pollution Prevention Technologies

Verification Test Plan
for the

Evaluation of Kaselco Electrocoagulation
Treatment System

November 2, 2001

i


-------
Revision 0 - 11/02/01

TITLE: Environmental Technology Verification Program for Metal Finishing
Pollution Prevention Technologies Verification Test Plan for the Evaluation
of Kaselco Electrocoagulation Treatment System

ISSUE DATE: November 2, 2001

DOCUMENT CONTROL

This document will be maintained by Concurrent Technologies Corporation (CTC) in accordance
with the EPA Environmental Technology Verification Program Quality and Management Plan
for the Pilot Period 1995-2000 (EPA/600/R-98/064). Document control elements include unique
issue numbers, document identification, numbered pages, document distribution records,
tracking of revisions, a document MASTER filing and retrieval system, and a document
archiving system.

ACKNOWLEDGMENT

This is to acknowledge Valerie Whitman (CTC), Paul Morkovsky (Kaspar Electroplating
Company), and Kelly Mowry (Gull Industries) for their help in preparing this document.

Concurrent Technologies Corporation is the Verification Partner for the EPA ETV Metal
Finishing Pollution Prevention Technologies Center under EPA Cooperative Agreement No.

CR826492-01-0.

11


-------
Revision 0 - 11/02/01

Environmental Technology Verification Program for Metal Finishing Pollution Prevention
Technologies Verification Test Plan for the Evaluation of the Kaselco Electrocoagulation

Treatment System

PREPARED BY:

Jathks Totter

CTC Senior Metal Finishing Engineer

//

(it h'

Date



George Cushaie, CAJ Resounds,
ETV'MF Project Manager

	i	\

Date

APPROVED BY:

/

Clinton Twiltey
CTC QA M.irngcr

fa

/COl't't'i.

Do fin Brown

CTC ETV-MF Program Manager

Date

/

//f t*/o /

	fWuA

A Iva DanSe ts

EPA fc'TV Center Manager

13. 7W1

Date

n- ' J?'- ^

I l ,*{ropUrf>ri[' Compiiny

* —-
Foul WJi'K'viJk/
Kaspar I:J-.)CCrapUl*M;'

I

U

Date

II

i/l ^fo\

Date

Signature denotes acceptance of this test plan as written regarding experimental design, quality assurance, test and
analysis methods, operational procedures, equipment configuration, project management and current system
operating effectiveness prior to testing.

Ill


-------
Revision 0 - 11/02/01

TABLE OF CONTENTS

Page

1.0 INTRODUCTION	1

2.0 TECHNOLOGY DESCRIPTION	2

2.1	Theory of Operation	2

2.2	Description of Kaselco System	5

2.3	Description of the Ion Exchange Polishing System	6

2.4	Commercial Status	8

2.5	Environmental Significance	8

2.6	Local Installation	8

3.0 EXPERIMENTAL DESIGN	15

3.1	Test Goals and Objectives	15

3.2	Critical and Non-Critical Measurements	15

3.3	Test Matrix	16

3.4	Testing and Operating Procedures	18

3.4.1	Set-Up and System Initialization Procedures	18

3.4.2	System Operation	19

3.4.3	Sample Collection and Handling	20

3.4.4	Process Measurements and Information Collection	22

3.4.4.1	Duration of Treatment and Wastewater Volume Processed	23

3.4.4.2	Polymer Usage Data	24

3.4.4.3	Volume of Ion Exchange Regenerant	24

3.4.4.4	Ion Exchange System Regeneration Chemical Use	24

3.4.4.5	Quantity of Sludge	26

3.4.4.6	Electricity Use Data	26

3.4.4.7	System Operation and Maintenance Data	26

3.4.4.8	Cost Data	26

3.4.4.9	Steel Plate Consumption	26

3.4.4.10	Ion Exchange System Operational Data	26

3.5	Analytical Procedures	27

4.0 QUALITY ASSURANCE/QUALITY CONTROL REQUIREMENTS	28

4.1 Quality Assurance Objectives	28

iv


-------
Revision 0 - 11/02/01

4.2	Data Reduction, Validation, and Reporting	28

4.2.1	Internal Quality Control Checks	28

4.2.2	Calculation of Data Quality Indicators	29

4.2.2.1	Precision	29

4.2.2.2	Accuracy	30

4.2.2.3	Completeness	30

4.2.2.4	Comparability	33

4.2.2.5	Representativeness	33

4.2.2.6	Sensitivity	33

4.3	Additional Data Calculations	34

4.3.1	Ability to Meet Metal Finishing and Proposed MP&M Limitations	34

4.3.2	Mass Balance	35

4.3.3	Pollutant Removal Efficiency	36

4.3.4	Reusability of Treated Wastewater	36

4.3.5	Energy Use	36

4.3.6	Cost Analysis	37

4.3.7	Sludge Generation Analysis	37

4.3.8	Environmental B enefit	37

4.4	Test Plan Modifications	38

4.5	Quality Audits	38

5.0 PROJECT MANAGEMENT	39

5.1 Organization/Personnel Responsibilities	39

6.0 EQUIPMENT AND UTILITY REQUIREMENTS	40

7.0 HEALTH AND SAFETY PLAN	40

7.1	Hazard Communication	40

7.2	Emergency Response Plan	40

7.3	Hazard Controls Including Personal Protective Equipment	40

7.4	Lockout/Tag out Program	40

7.5	Materi al Storage	41

7.6	Safe Handling Procedures	41

8.0 WASTE MANAGEMENT	41

9.0 TRAINING	41

10.0 REFERENCES	42

v


-------
Revision 0 - 11/02/01

11.0 DISTRIBUTION	42

LIST OF FIGURES

Page

Figure 1. Diagram of Kaselco System	3

Figure 2. Photograph of Kaselco System	4

Figure 3. Photograph of Interior of Electrocoagulation Reactor (Rx)	5

Figure 4. Diagram of Ion Exchange Polishing System	7

Figure 5. Photograph of Gull Industries' Decorative Chromium Plating Line	9

Figure 6. 20,000 Liter Equalization Tank	9

Figure 7. Diagram of the Kaselco Installation at Gull Industries	11

Figure 8. Photograph of the Kaselco System Installed at Gull Industries	11

Figure 9. Photograph of the Ion Exchange Polishing System Installed at Gull Industries	13

Figure 10. Photograph of the Kaselco System Showing Sample Point 1	21

Figure 11. Photograph of the Kaselco System Showing Sample Point 4	22

LIST OF TABLES

Table 1. Preliminary Analytical Results	12

Table 2. Summary of Current and Proposed Regulations Applicable to Gull Industries	14

Table 3. Test Matrix for the Kaselco System and Ion Exchange Polishing System	17

Table 4. Test Objectives and Related Test Measurements for Evaluation of the

Kaselco System	18

Table 5. Sampling Sequence for Batch Treatment and Test Runs	20

Table 6. Sampling Locations, Frequency and Parameters	23

Table 7. Sample Quantities from Each Sampling Point	25

Table 8. Summary of Analytical Tests and Requirements	27

Table 9. QA Objectives	32

Table 10. Applicable Pretreatment Standards for Existing Sources for the

Metal Finishing Subcategory (40 CFR 433)	 34

Table 11. Applicable Proposed Pretreatment Standards for Existing Sources for the

MP&M Job Shop Subcategory (66 FR 424)	35

vi


-------
Revision 0 - 11/02/01

LIST OF APPENDICES

APPENDIX A:	Operating Procedures for Kaselco System		A-1

APPENDIX B:	Data Collection Forms for Kaselco and Ion Exchange Polishing

Systems		B-l

APPENDIX C:	Test Plan Modification Request		C-1

APPENDIX D:	ETV-MF Operation Planning Checklist		D-l

APPENDIX E:	Job Training Analysis Form		E-1

APPENDIX F:	ETV-MF Project Training Attendance Form		F-l

vii


-------
Revision 0 - 11/02/01

ACRONYMS & ABBREVIATIONS

BPT	Best Practical Treatment

C	Celsius

cfrn	Cubic Feet per Minute

cm	Centimeter

COC	Chain of Custody

CTC	Concurrent Technologies Corporation

DAF	Dissolved Air Flotation

DC	Direct Current

EHS	Extremely Hazardous Substances

EPA	Environmental Protection Agency

ETV-MF	Environmental Technology Verification - Metal Finishing

ft	Feet

g	Gram

gal	Gallon

gpm	Gallons per Minute

hp	Horsepower

hr	Hour

ICP	Inductively Coupled Plasma

ID	Identification

IDL	Instrument Detection Limit

JTA	Job Training Analysis

Kaselco	Kaselco Electrocoagulation Treatment System

kg	Kilogram

kW	Kilowatt

kWh	Kilowatt Hour

L	Liter

L/min	Liter per Minute

LM	Laboratory Manager

m3	Cubic Meters

MDL	Method Detection Limit

? S	Microsiemens

mg/L	Milligram/Liter

min	Minute

mL	Milliliter

MP&M	Metal Products & Machinery

MRL	Method Reporting Limit

MSDS	Material Safety Data Sheet(s)

ND	Not Detected

NR	Not Regulated

NRMRL	National Risk Management Research Laboratory

O&G	Oil and Grease

O&M	Operating & Maintenance

P	Percent Recovery

viii


-------
Revision 0 - 11/02/01

ACRONYMS & ABBREVIATIONS (continued)

PARCCS

Precision, Accuracy, Representativenss, Comparability, Completeness and



Sensitivity

PLC

Programmable Logic Controller

PM

Program Manager

POC

Point of Contact

POTW

Publicly Owned Treatment Works

ppb

Parts per Billion

PPE

Personal Protective Equipment

ppm

Parts per Million

PQL

Practical Quantification Limit

psi

Pounds per Square Inch

QA/QC

Quality Assurance/Quality Control

QMP

Quarterly Management Plan

R

Raw Wastewater Samples

RPD

Relative Percent Difference

Rx

Reactor

SOP

Standard Operating Procedure

SR

Sample Result

SSR

Spiked Sample Result

STL

Severn Trent Laboratories

T

Treated Wastewater Samples

IDS

Total Dissolved Solids

TMDL

Total Maximum Daily Limit

TOC

Total Organic Carbon

TPMR

Test Plan Modification Request

TSA

Technical System Audit

TSS

Total Suspended Solids

U.S.

United States

IX


-------
Revision 0 - 11/02/01

1.0 INTRODUCTION

The purpose of this test plan is to document the objectives, procedures, equipment, and
other aspects of testing that will be utilized during verification testing of the Kaselco
Electrocoagulation Treatment System. This test plan has been prepared in conjunction
with the U.S. Environmental Protection Agency's (EPA's) Environmental Technology
Verification Program for Metal Finishing Pollution Prevention Technologies (ETV-MF).
The objective of this program is to identify promising and innovative pollution
prevention technologies through EPA-supported performance verifications. The results
of the verification test will be documented in a verification report that will provide
objective performance data to metal finishers, environmental permitting agencies, and
industry consultants. A verification statement, which is an executive summary of the
verification report, will be prepared and signed by the EPA National Risk Management
Research Laboratory (NRMRL) Director.

1.1 Background

The Kaselco system is designed to treat wastewaters containing dissolved metals,
including hexavalent chromium, and organics such as oil. During this test, the Kaselco
system will be used in conjunction with an ion exchange polishing1 system to treat the
wastewater from a metal finishing job shop.

The focus of testing will be to determine the quality of the effluent produced by the
Kaselco system alone and in combination with the ion exchange system, the quantity and
characteristics of wastewater sludge produced during treatment, the quantity and
characteristics of ion exchange regenerant produced during treatment, and the cost of
operation. In terms of effluent water quality, of particular interest is the ability of the
treatment systems to meet existing effluent standards for the Metal Finishing point source
category [Ref. 1] and proposed effluent standards for the Metal Products and Machinery
(MP&M) point source category [Ref. 2], The metal finishing regulations were
promulgated in July 1983, which for most metal finishing companies are the applicable
current standards. The proposed MP&M limitations were published on January 3, 2001.

Testing of the Kaselco system will be conducted at Gull Industries, located in Houston,
Texas. Gull Industries is a metal finishing job shop that performs decorative chromium
electroplating, electroless nickel plating, and passivation of stainless steel. The Kaselco
system has been installed at Gull Industries for approximately five years. During this
time period, the Kaselco system was under development and several versions of the
technology have been used. The present Kaselco system installed at Gull Industries is a
38-liter/min(l/min)/10gallons/minute (gpm) commercial unit with two electrocoagulation
reactors (Rxs) connected in series. It is operated on a batch basis. The ion exchange

1 "Polishing" is a term used to describe a system that is utilized to remove residual contaminants following treatment
by a preliminary technology. Typically, the preliminary technology removes the bulk of the contaminants and the
polishing technology removes most of the remaining contaminants. Polishing technologies are frequently utilized
as final treatment prior to water recycling or when stringent discharge standards exist.

1


-------
Revision 0 - 11/02/01

polishing system at Gull Industries was installed in 2001. It can be operated as a stand
alone treatment system or as a polishing technology. It has a design flow rate of 83
L/min (22 gpm) and can be operated in a batch or continuous mode.

Wastewater from the Gull Industries electroplating line will be processed during testing.
Testing will consist of three test runs, with each test run treating approximately 3,400 L
of wastewater. During testing, samples of raw and treated wastewater, sludge, and ion
exchange regenerant will be collected and analyzed.

This test plan has been structured based on a format developed for ETV-MF projects.
This document describes the intended approach and explains testing plans with respect to
areas such as test methodology, procedures, parameters, and instrumentation. Also
included are quality assurance (QA)/quality control (QC) requirements of this task that
will ensure the accuracy of data, data interpretation procedures, and worker health and
safety considerations.

1.2 Data Quality Objectives (DQO)

The systematic planning elements of the data DQO process identified in "Guidance for
the Data Quality Objectives Process" (EPA QA/G-4, August 2000), were specifically
utilized during preparation of this verification test plan. The project team, composed of
representatives from CTC, the testing organization, the technology vendor, the host site,
the analytical laboratory, and the US EPA, who assisted in preparing this test plan, jointly
developed: the test objectives, critical and non-critical measurements, the test matrix,
sample quantity, type, and frequency, analytical methods, and QA objectives to arrive at
an optimized test designed to verify the performance of the technology.

2.0 TECHNOLOGY DESCRIPTION

2.1 Theory of Operation

The Kaselco system (see diagram of system in Figure 1 and photograph of system in
Figure 2) is a series of tanks and associated equipment used to process industrial
wastewater containing dissolved metals and organics such as oil. According to the
manufacturer, use of the Kaselco electrocoagulation system can replace conventional
chemical treatments such as pH adjustment, sulfide compound chromium reduction, oil
removal, and chemical coagulation.

The unique aspect of the Kaselco system is the electrocoagulation step.
Electrocoagulation is a process that uses electricity (direct current) and metal plates to
cause metal contaminants in wastewater to become destabilized and precipitate. Several
materials such as steel, aluminum, and titanium are available for the eactor plates. Steel
plates are used in the Kaselco system that will be tested during this verification project.
The unit is configured with anode, cathode and non-polarized steel plates. The plates are
stacked in a reactor tank with small gaps separating each plate. Wastewater flows in a
serpentine pattern around the plates causing electrical current to flow from plate to plate.

2


-------
Revision 0 - 11/02/01

The current flow causes the steel anode plates to dissolve slowly, thereby releasing
ferrous ions into the wastewater. The polarity of the plates is automatically reversed on a
periodic basis. This action maintains a clean steel plate surface and equalizes the
corrosion rates of the plates. A photograph showing the inside of an electrocoagulation
reactor with electro-corroded steel plates is shown in Figure 3. The ferrous iron that is
dissolved in the wastewater chemically reacts with the hexavalent chromium and reduces
it to the trivalent state. During this reduction process, the iron is converted to trivalent
iron hydroxide and other compounds, which results in a co-precipitation effect, where the
iron hydroxide adsorbs heavy metal cations (e.g., nickel) onto its surface. The process
has the advantage of being able to reduce chromium at neutral pH. The conventional
chromium reduction process (sodium bisulfate reduction process) is operated between pH
2.0 and 3.0. Since the incoming wastewater is usually above this pH range, acid is added
to lower the pH. This is a drawback of the conventional process since the subsequent
metal removal step (i.e., precipitation) is performed at an elevated pH (7.0 to 9.5), and
therefore the introduction of an acid increases the subsequent need for alkali reagent.

The electrocoagulation system also removes oil. According to the manufacturer, this is
accomplished by converting oil to a metallic soap scum and removing it by settling in a
clarifier, as with the system that will be tested, or by using dissolved air flotation (DAF).
DAF is used when the solids component of the wastewater tends to rise (e.g., high
hydrocarbon concentration).

Figure 1. Diagram of Kaselco System

3


-------
Revision 0 - 11/02/01

Figure 2. Photograph of Kaselco System

According to the manufacturer, the benefit of electrocoagulation is threefold:

?? Wastewaters containing hexavalent chromium or oil do not need to be segregated and
pretreated (i.e., hexavalent chromium reduction, emulsion breaking) prior to metals
precipitation.

?? Use of treatment reagents is substantially reduced or eliminated, resulting in cost
savings.

?? Because fewer or no reagents are used, the effluent is lower in total dissolved solids
(TDS) than with use of standard chemical treatment precipitation, thus increasing the
recycle potential of the effluent.

The installed ion exchange polishing system consists of three skid-mounted pressure
vessels, with interconnecting piping and control valves. It is also equipped with a
programmable logic controller (PLC)-based control system.

Ion exchange is a chemical reaction wherein an ion from solution is exchanged for a
similarly charged ion attached to an immobile solid particle (i.e., ion exchange resin).
Ion exchange reactions are stoichiometric (i.e., predictable based on chemical
relationships) and reversible. The strategy employed in using this technology is to
exchange somewhat harmless ions (e.g., hydrogen and hydroxyl ions), located on the
resin, for ions of interest in the solution (e.g., regulated metals). In the most basic sense,
ion exchange materials are classified as either cationic or anionic. Cation resins
exchange hydrogen ions for positively charged ions such as nickel, copper, and sodium

4


-------
Revision 0 - 11/02/01

Anion resins exchange hydroxyl ions for negatively charged ions such as chromates,
sulfates, and cyanide [Ref. 3 |.

Ion exchange resins are usually contained in vessels referred to as columns. The basic
column consists of a resin bed, which is retained in the column with inlet and outlet
screens, and service and regeneration flow distributors. Piping and valves are required to
direct flow and instrumentation is required to monitor water quality and control
regeneration timing. The systems are operated in cycles consisting of the following four
steps:

1.	Service (exhaustion) - Water solution containing ions is passed through the ion
exchange column or bed until the exchange sites are exhausted.

2.	Backwash - The bed is washed (generally with water) in the reverse direction of
the service cycle in order to expand and resettle the resin bed.

3.	Regeneration - The exchanger is regenerated by passing a concentrated solution
of the ion originally associated with it through the resin bed; usually a strong
mineral acid or base.

4.	Rinse - Excess regenerant is removed from the exchanger, usually by passing
water through it.

Figure 3. Photograph of Interior of Electrocoagulation Reactor (Rx)
2.2 Description of Kaselco System

Various configurations of the Kaselco system are in use. A diagram of a typical system
is shown in Figure 1. Wastewater initially flows into the electrocoagulation Rx. In the

5


-------
Revision 0 - 11/02/01

system Rx, a direct current (100 to 120 amps, 0 to 40 volts DC) is applied using an
associated rectifier and sacrificial anode plates. The typical residence time in the Rx is
14 seconds. Reactions occur in the Rx, including the reduction of Cr+6 to Cr+3, and the
generation of insoluble oxides and hydroxides. Single or dual Rx units can be used.
Also, single or multiple pass systems can be designed. The wastewater flows from the
Rx to a de-foam tank, which has a residence time of 30 min. Electrolysis gases are
separated from the wastewater in the de-foam tank, which is agitated by a mechanical
mixer. A polymer is sometimes added to improve floe formation as the wastewater exits
the de-foam tank (not all Kaselco systems use polymer). The wastewater is then
transferred through a sludge thickener to a conventional clarifier where solids separation
takes place. The overflow from the clarifier is discharged to a storage tank. The
underflow from the clarifier goes to a thickener. Thickened sludge is dewatered on a
filter press and sent off-site for recovery or disposal.

Kaselco systems are designed to operate on either a continuous flow or batch basis. The
system that will be tested is a batch treatment process and is described in section 2.6.

2.3 Description of the Ion Exchange Polishing System

The installed polishing system consists of skid-mounted pressure vessels, with
interconnecting piping and control valves. The process parameters and equipment status
are constantly monitored and fed back to a PLC-based control system. The system status
and process parameters are viewed on a display located in the control panel, which is also
mounted on the skid.

A schematic diagram of the ion exchange polishing system is shown in Figure 4. The
system operates by receiving influent from a tank via a three-way valve, to the suction
side of a pump. The water is then discharged from the pump under pressure, and is
monitored for pH, specific conductance, pressure, and flow. The resultant analog signals
are sent to the PLC for subsequent processing and display. Each of the analog signals has
two high-level and two low- level alarms. The alarms cause the valve systems to either
open or close, which cause a change of direction or stopping of flow. The alarms cause a
change in direction of flow, or they cause the valve systems to either open or close). The
water is allowed to enter the top of the first vessel containing a cation resin to remove the
initial shock loading of heavy metals; and exits at the bottom of that vessel.

6


-------
Revision 0 - 11/02/01

Figure 4. Diagram of Ion Exchange Polishing System

The partially de-ionized water then enters the second and third vessels (anion columns) in
the same manner as the first vessel, whereupon the remaining ionic loading is removed.
The resultant discharge from vessel number 3 is again monitored for pH and specific
conductance, and can then be reused in the metal finishing process.

The contaminants from the influent remain in each of the three vessels bonded to each of
the special purpose resins. The water is allowed to flow continuously through the system
until such time that the resin is exhausted (i.e., its ability to remove cations and anions
from the water has ended). This is determined by the specific conductance of the water
exiting the system at vessel number 3. At this point the system goes off line (usually
outside production hours) and regenerates itself in situ.

The regeneration process (the process of removing cations and anions from the resin,
which were captured during normal operation) is carried out automatically. Each vessel
regenerates itself in turn starting with vessel number 1. Passing acids and/or bases over
the resins to remove the captured cations and anions carries out regeneration of the resin.
City water is used as a rinse following regeneration. The regenerant exits each of the
vessels and is captured in a holding tank for subsequent processing and disposal. At this
point, the unit is ready to go back on line for the processing of influent.

7


-------
Revision 0 - 11/02/01

2.4	Commercial Status

The Kaselco system is a fully commercialized product. The ion exchange polishing
system is a separate commercial product.

2.5	Environmental Significance

The Kaselco system treats metal finishing wastewaters with little or no use of chemical
reagents such as acids, alkalis, or sodium metabisulfite. These materials effectively
remove metals, but they add to the TDS content of the wastewater. The Kaselco system
effluent is thus expected to be lower in dissolved solids and, therefore, is more amenable
to recycling back to the metal finishing process. Also, the Kaselco system effluent is
reported to be below 10 milligrams/liter (mg/L) oil and grease (O&G). By producing an
effluent that is very low in O&G content, the effluent is more amenable to recycling.
This is due to the fact that oil can render ineffective technologies that are used for final
polishing prior to water reuse such as ion exchange resins and membranes. Also, oil can
cause precipitated particles to remain suspended or float in clarifiers, resulting in
carryover of solids to the discharge. Therefore, by lowering the O&G concentration, the
concentration of metals in the effluent may also be decreased.

The overall quantity of sludge produced by the Kaselco system may be lower than for
conventional systems that use lime or sodium hydroxide for metals precipitation. The
conventional systems generate bulky hydroxide precipitants, while much of the
precipitated material from the Kaselco system is reported to be in the form of metal
oxides.

The ion exchange polishing system reportedly removes toxic metals to near or below
detection limits and effectively deionizes wastewater. Resultant discharges of the
wastewater contain little or no measurable concentrations of toxic metals. Also, the
processed water may be sufficiently purified for reuse in the electroplating process,
which may entirely eliminate the discharge of liquid to the sewer or receiving streams.

2.6	Local Installation

The Kaselco and ion exchange polishing systems will be tested at Gull Industries, located
in Houston, Texas. Gull Industries is a metal finishing job shop that performs nickel and
chromium electroplating, electroless nickel plating, and passivation using nitric acid. A
photograph of the decorative chromium plating line is shown in Figure 5. The Kaselco
system installed at Gull Industries is rated at 38 L/min and has dual electrocoagulation
Rxs piped in series. The ion exchange polishing system installed at Gull Industries is
rated at 83 L/min. It has one cation column (1.02 cubic meters (m3) of resin) and two
anion columns (total of 1.13 m3 of resin).

8


-------
Revision 0 - 11/02/01

Figure 5. Photograph of Gull Industries' Decorative Chromium Plating Line

The majority of wastewater generated at Gull Industries is rinse water and to a lesser
extent spent cleaning baths. Approximately 7,500 L of wastewater is generated on a
daily basis at Gull Industries. The concentration of regulated metals in the wastewater is
typically above 300 mg/L (mostly nickel and chromium). Raw wastewater is stored in a
20,000-L equalization tank (Figure 6) prior to treatment.

Figure 6. 20,000 Liter Equalization Tank

9


-------
Revision 0 - 11/02/01

A diagram of the combined Kaselco/ion exchange system installed at Gull Industries is
shown in Figure 7. It consists of electrocoagulation (two Rxs in series), de-foam tank,
flow-through sludge thickener, clarifier, filter press, ion exchange system, storage tanks,
and associated pumps, piping and controls. The treatment tanks (de-foam tank, flow-
through sludge thickener, clarifier) have a total liquid capacity of approximately 3,400
liters (900 gallons).

A photograph of the Kaselco system at Gull Industries is shown in Figure 8 The large
plastic box on the right side of the photograph is the rectifier, and the box on the left side
is the electrocoagulation unit.

Wastewater treatment is performed on a batch basis. Each batch consists of
approximately 3,400 liters (900 gal.) and the processing rate is 38 L/min. One to two
batches are processed each day. During treatment, wastewater is pumped from the
20,000-L equalization tank through the Rx. Wastewater exiting the Rx is diverted to one
of two storage tanks (tanks 1 and 2). Once the entire batch has been processed, the
wastewater in the storage tank is tested using bench-top methods2. If the wastewater is
insufficiently treated, it is reprocessed through the electrocoagulation system and diverted
to a different storage tank, and retested using the bench-top methods. If the wastewater is
determined to be sufficiently treated, the wastewater is reprocessed through the
electrocoagulation unit and the discharge is diverted to the de-foam tank. The wastewater
then flows through the sludge thickener and the clarifier and is collected in the
intermediate storage tank. From this point, the wastewater is processed through the ion
exchange polishing system.

2 A sample of the wastewater from the storage tank is subjected to a simulated treatment process, performed in a
beaker. A small amount of polymer is added to the beaker, which causes precipitated solids in the wastewater to
form a dense floe and settle to the bottom of the beaker. The clarified wastewater or "supernatant" is then
sampled and tested for nickel and chromium using bench-top analytical procedures.

10


-------
Revision 0 - 11/02/01

Influent (Raw

Wastewater from

.. Equalization tank)
Sampling

Point 1	-*1

Rttuiitt

Storage
Tarts
1 or 2

Sampling

Pottit 2—

APasses
1 and 2

u

Ex

Fiiml
Storage

Pass 3
Caustic Caustic

Anion
Column

7T

Sampling ,¦

Point 6

Conductivity
measurement

Anion
Column

Polymer

II

De-Foam
Tank

~ Overflow to
Intermediate
Storage T ank

Acid

~ T

Solids

Sampling Overflow from
PomtJ. Clarillef

\	| |—Filter

Press Filtrate

Solids

Cation
Coluiiiii

,

Inler-
niediate
Storage
Tank

Sludge
Hopper



pH. conductivity, Samptng
now, and picture p0^ 3
measurements

erant
Storage

Fihrate
¦To Intermediate
Storage Tank

___ Sampling
Point 4

Sampling
Point 7

Regeneration How

Figure 7. Diagram of the Kaselco Installation at Gull Industries

Figure 8. Photograph of the Kaselco System Installed at Gull Industries

11


-------
Revision 0 - 11/02/01

As discussed above, the electrocoagulation process is repeated as necessary until the
bench-top methods indicate that the concentration of regulated parameters is sufficiently
low. Most frequently, each 3,400- to 3,800-L batch at Gull Industries is processed
through the Rx two times. During the first pass, most of the hexavalent chromium is
reduced to trivalent chromium and a portion of the dissolved metals is precipitated.
During the second pass, the majority of the dissolved metals are precipitated. Analytical
results of samples collected during a preliminary test of the technology reflect this result
(see Table 1).

A photograph of the ion exchange polishing system is shown in Figure 9. The system
operates by pumping wastewater (effluent from Kaselco system) from the intermediate
storage tank to the ion exchange system. The wastewater passes continuously through
one cation and two anion columns. The ion exchange polishing system removes any
residual dissolved metals to near or below detection levels and substantially lowers the
TDS of the water. Analytical results of samples collected during a preliminary test are
shown in Table 1. The effluent of the ion exchange system is sufficiently purified such
that it is used as rinse water on the Gull Industries metal finishing line. The wastewater
may also be discharged to the city sewer system. The pH and specific conductance of the
wastewater are monitored at various points in the process. The system is capable of
treating up to approximately 12,000 to 24,000 L of wastewater before the resin is
exhausted. This is determined by the specific conductance of the water exiting the
system at vessel number 3. Once the resin is exhausted, the system goes off line (usually
outside production hours) and regenerates itself in situ.



Raw

Pass 1

Pass 2



(mg/L)

(mg/L)

(mg/L)

TDS

1320

876

655

Chromium (Hexavalent)

70.5

<015

<015

Cadmium

.008

ND

ND

Chromium (T)

89.5

ND

.287

Copper

1.31

ND

.011

Iron

6.65

11.1

8.80

Lead

.252

.013

ND

Manganese

.171

2.96

1.71

Molybdenum

ND

ND

ND

Nickel

202

45.6

1.29

Tin

.057

ND

ND

Zinc

3.09

.734

ND

ND = Not Detected

Table 1. Preliminary Analytical Results

The following indicate the size and utility requirements of the ion exchange polishing
system installed at Gull Industries:

?? Flow Rate 83 L/min (22 gpm)

?? Electrical 2.2 Kilowatts (kW)

12


-------
Revision 0 - 11/02/01

?? Air	1 cubic foot per minute (cfm) @ 80 pounds per square inch (psi)

intennittently

?? City Water Max flow 13.6 L/'min (3.6 gpm), for regeneration only
?? Dimensions Length 15 feet (ft)

Width 8 ft
Height 10 ft

The plant has the following parameters monitored that are continuously logged to disc:

??	Inlet specific conductance (? S)

??	pH

??	Pump discharge pressure (psi)

??	Flow (gpm)

??	Outlet specific conductance (? S)

Figure 9. Photograph of the Ion Exchange Polishing System Installed at Gull Industries

All parameters are logged by software for subsequent analysis and archived for viewing
at a later date. All events are date and time stamped. As part of the after-sale backup, the
system is connected to a modem, so that if a problem should arise, the manufacturer is

13


-------
Revision 0 - 11/02/01

able to remotely interrogate the system for troubleshooting purposes. It also allows
downloading of software updates.

The current discharge limits for Gull Industries are shown in Table 2. Also shown in
Table 2 are the proposed pretreatment limits for existing sources for the MP&M Job
Shop subcategory. These proposed limitations are significantly lower than the existing
limitations.



Current Gull Industries

MP&M Pretreatment Standards



Limitations

for Existing Sources (PSES)







Job Shop Subcategory

Parameter

Daily Max.,

4-Day Avg.,

Daily Max.,

Monthly Avg.,



mg/L

mg/L

mg/L

mg/L

Cyanide T

NR

NR

0.21

0.13

Cyanide A

5.0

2.7

0.14

0.07

Cadmium

1.2

0.7

0.21

0.09

Chromium*

3.0

1.0

1.3

0.55

Copper*

3.0

2.0

1.3

0.57

Lead

0.6

0.4

0.12

0.09

Mercury*

0.02

0.01

NR

NR

Manganese

NR

NR

0.25

0.10

Molybdenum

NR

NR

0.79

0.49

Nickel*

3.0

2.0

1.5

0.64

Silver*

2.0

1.0

0.15

0.06

Tin

NR

NR

1.8

1.4

Zinc

2.61

1.48

0.35

0.17

O&G (local

100

NR

NR

NR

limit)









O&G (as

NR

NR

52

26

HEM)









TSS

NR

NR

NR

NR

TOC

NR

NR

78

59

TOP

NR

NR

9.0

4.3

Sulfide (as S)

NR

NR

31

13

NR = Not Regulated.

*Local standard only (grab/composite instead of daily max./4-day average).

Current Gull Industries limitations are based on a combination of local standards and Federal standards (40
CFR 413 and 40 CFR 433).

O&G (as HEM) is not regulated under pretreatment standards for the Job Shop subcategory. However, it is
regulated under the Best Practical Treatment (BPT) limitations for direct dischargers in the Job Shop
subcategory (66 FR 423). The values shown are the BPT proposed limitations.

Table 2. Summary of Current and Proposed Regulations Applicable to Gull Industries

14


-------
Revision 0 - 11/02/01

Gull Industries has established water recycling specifications that must be met in order to
reuse treated wastewater. These specifications are:

?? IDS of 250 mg/L

?? Specific conductance: maximum of 500 ? S
?? pH: within the range of 5.0 to 9.0 standard units

EXPERIMENTAL DESIGN

3.1	Test Goals and Objectives

The overall goals of this ETV-MF project are: (1) evaluate the ability of the Kaselco and
ion exchange polishing systems to remove pollutants from metal finishing job shop
wastewaters, with the metal finishing effluent guidelines used as target effluent
concentrations, (2) determine the ability of the combined systems to recover water for
reuse in the electroplating process, (3) evaluate the operating characteristics of the
systems with respect to sludge and regenerant generation and operating costs, and (4)
evaluate the environmental benefit by determining the reduction in metals discharged to
the city sewer system.

The following is a summary of primary project objectives. For the installation at Gull
Industries, verification testing is being conducted in order to:

?? Determine the ability of the Kaselco and ion exchange polishing systems to remove
specific contaminants from wastestreams and meet the applicable daily maximum
metal finishing limitations and Gull Industries' target specification for water reuse.
?? Determine the quantity and chemical characteristics of the sludge generated by the

Kaselco treatment system.

?? Determine the cost of operating the Kaselco and ion exchange polishing systems for
the specific conditions encountered during testing:

1)	Determine the amount and cost of operating and maintenance (O&M) labor.

2)	Determine the quantity and cost of chemical reagents used and other materials
(e.g., filters), including ion exchange regeneration.

3)	Determine the quantity and cost of steel plates (anodes) consumed.

4)	Determine the quantity and cost of energy consumed by operating the systems.

5)	Determine the cost of sludge disposal.

?? Quantify the environmental benefit by determining the reduction in metals discharged
to the sewer system beyond that required by the metal finishing standards.

3.2	Critical and Non-Critical Measurements

Measurements that will be taken during testing are classified below as either critical or
non-critical. Critical measurements are those that are necessary to achieve the primary
project objectives. Non-critical measurements are those related to process control or
general background readings.

15


-------
Revision 0 - 11/02/01

Critical Measurements:

?? volume of wastewater treated (L/test run)

?? quantity (kilogram (kg)/test run) and costs ($/test run) of chemical treatment reagents

and other materials used in treatment
?? mass of steel plates consumed (kg)/volume processed
?? volume of filter press sludge generated (L/test)

?? chemical characteristics of raw wastewater (specific conductance (?S)3, mg/L of total
suspended solids (TSS), O&G (as HEM), total organic carbon (TOC), cadmium,
chromium (+6), chromium (T), copper, iron, lead, manganese, molybdenum, nickel,
tin, sulfide (as S), zinc, and IDS)

?? chemical characteristics of treated effluent from the Kaselco system (specific
conductance (?S), mg/L of TSS, O&G (as HEM), TOC, cadmium, chromium (+6),
chromium (T), copper, iron, lead, manganese, molybdenum, nickel, tin, sulfide (as S),
zinc, and IDS)

?? chemical characteristics of treated effluent from the ion exchange polishing system
(specific conductance (?S), pH, mg/L of TSS, O&G (as HEM), TOC, cadmium,
chromium (+6) chromium (T), copper, iron, lead, manganese, molybdenum, nickel,
tin, sulfide (as S), zinc, and TDS)

?? chemical characteristics of filter press sludge from the Kaselco system (density, mg/L
of solids, cadmium, chromium (T), copper, lead, manganese, molybdenum, nickel,
tin, zinc)

?? O&M labor requirements (hours/test run) and costs ($/test run)

?? energy use (kilowatt (kWh)/test run) and costs ($/test run)of components of the

Kaselco and ion exchange polishing systems (e.g., rectifier, pumps)

?? Chemical use during ion exchange regeneration

Non-Critical Measurements:

?? Kaselco rectifier DC output (amp-hours)

?? pH of raw wastewater

?? pH of treated wastewater following treatment by the Kaselco system
?? flow, pH and specific conductance of wastewater at various internal points within the
ion exchange polishing system

3.3 Test Matrix

The verification test will be conducted by processing 3,400-L batches of raw wastewater
through the Kaselco system and subsequently through the ion exchange polishing system
(each completely treated batch is referred to as a "test run"). Each batch will be

3 Specific conductance is a measure of the ability of a water solution to conduct an electrical current. It is
commonly expressed in microsiemens ((is). Specific conductance is related to the type and concentration of ions
in solution and can be used for approximating the dissolved-solids content of the water.

16


-------
Revision 0 - 11/02/01

processed through the Kaselco electrocoagulation reactors a minimum of three times4
(three "passes") prior to clarification. Following clarification, the wastewater will be
stored in an intermediate storage tank. It will then be processed through the ion exchange
polishing system and collected in a final storage tank. For each test run, samples will be
collected from the raw wastewater, the discharge after each pass through the two
electrochemical reactors, the treated wastewater following clarification, the influent to the
ion exchange polishing system, and the effluent from the ion exchange polishing system.
A single sludge sample will be collected after all the batches of wastewater are treated,
and a single sample of the ion exchange regenerant will be collected after the ion
exchange polishing system is regenerated. The operating conditions for the three test
runs are shown in Table 3.

Test

Wastewater

Kaselco System

Ion Exchange System

Run

Processed

Conditions

Conditions

1

3,400 L of raw

?? 38 L/min

?? 80 L/min



wastewater

?? 3 EC cycles
?? 100 to 120 amps
?? 0 to 40 volts DC
?? Variable pH
?? 10-20 mg/L polymer
addition

?? Variable pH

2

3,400 L of raw

?? 38 L/min

?? 80 L/min



wastewater

?? 3 EC cycles
?? 100 to 120 amps
?? 0 to 40 volts DC
?? Variable pH
?? 10-20 mg/L polymer
addition

?? Variable pH

3

3,400 L of raw

?? 38 L/min

?? 80 L/min



wastewater

?? 3 EC cycles
?? 100 to 120 amps
?? 0 to 40 volts DC
?? Variable pH
?? 10-20 mg/L polymer
addition

?? Variable pH

Table 3. Test Matrix for the Kaselco System and Ion Exchange Polishing System

Test objectives and measurements are summarized in Table 4. The analytical test
parameters selected for this verification test are the parameters found in the Metal
Finishing and proposed MP&M regulations, plus iron, which is contributed to the
wastewater during the electrocoagulation process. Wastewater samples are to be
analyzed for dissolved metals, not total metals.

4 As discussed in section 2.6, Gull Industries repeats the electrocoagulation process until the wastewater is
sufficiently treated to meet local standards. Typically, the wastewater is processed two times through the reactor;
however, a greater number of cycles are possible to attain complete treatment.

17


-------
Revision 0 - 11/02/01

Test

Test Objective

Test Measurement

Runs 1 to 3

Determine the ability of the Kaselco system to
remove specific pollutants from wastestreams
and meet the applicable Metal Finishing and
water recycling specifications of Gull
Industries.

-	Volumes of raw wastewater processed.

-	Chemical characteristics of the influent and effluent.

Runs 1 to 3
(combined)

Determine the quantity and chemical
characteristics of the sludge and regenerant
generated by the treatment processes.

-	Volumes of raw wastewater treated.

-	Quantity, density and chemical characteristics of the
sludge.

-	Quantity and chemical characteristics of the
regenerant.

Runs 1 to 3

Determine the cost of operating the treatment
systems for the specific conditions encountered
during testing.

-	Volume of raw wastewater processed.

-	O&M labor requirements.

-	Energy use.

-	Input quantity and costs of chemical treatment
reagents (pounds/test run) and other materials used
in treatment.

-	Cost of sludge disposal.

-	Cost of steel plates consumed.

Runs 1 to 3
(combined)

Quantify the environmental benefit by
determining the reduction in metals discharged
to the Houston Publicly Owned Treatment
Works (POTW) beyond that required by the
Metal Finishing regulations.

-Volume of raw wastewater processed.
-Chemical characteristics of the effluent.

Table 4. Test Objectives and Related Test Measurements for Evaluation of the

Kaselco System

3.4 Testing and Operating Procedures

3.4.1 Set-Up and System Initialization Procedures

The Kaselco and ion exchange polishing systems are currently installed at Gull
Industries, and no additional equipment set-up is required. The Kaselco system
will be drained and cleaned and the ion exchange system will be regenerated prior
to testing. The quantity of chemicals used for regeneration and the total volume
of regenerant collected will be measured and recorded in accordance with
procedures outlined in sections 3.4.4.3 and 3.4.4.4. A diagram of the system is
shown in Figure 7.

Prior to initiating each test run, the entry of wastewater into the 20,000-L
equalization tank (raw wastewater storage) will be stopped until the pumping of
the raw wastewater through the electrocoagulation reactor is complete
(approximately 90 minutes). This procedure will eliminate variability of raw
wastewater characteristics during each batch and allow for grab sampling of the
raw wastewater.

18


-------
Revision 0 - 11/02/01

3.4.2 System Operation

During testing, the system will be operated by Gull Industries according to the
procedures found in Appendix A. These are the standard procedures used on a
daily basis at Gull Industries for conducting wastewater treatment.
Representatives of Kaselco and the ion exchange system manufacturer will assist
with operation of the systems. The source of raw wastewater during testing is the
equalization tank that is part of the existing Gull Industries wastewater treatment
system. The effluent from the ion exchange polishing system will be collected
into a final storage tank and tested by Gull Industries and reused on their metal
finishing lines or discharged to the city sewer system in accordance with their
present discharge permit.

During verification testing, both the Kaselco system and the ion exchange system
will be operated in batch modes, and only one system will be operated at a time.
Initially the Kaselco system will process a batch of raw wastewater, and the
treated water will be collected in the intermediate storage tank. The Kaselco
system will then be idled. The ion exchange system will then be initiated; it will
process the batch of wastewater in the intermediate storage tank and discharge it
to the final storage tank. This cycle will be repeated three times.

As discussed in section 2.6, the treatment tanks installed at Gull Industries have a
liquid capacity of approximately 3,400 L. Prior to the start of the first test run, the
tanks will be drained and cleaned. The system will then process one batch (3,400
L) of wastewater using three passes through the Rx units before diverting the
wastewater to the de-foam tank, thickener, and clarifier. Processing the first batch
of wastewater through the Kaselco system will fill the treatment tanks (de-foam,
thickener, and clarifier) with wastewater, but little or no discharge of treated
wastewater to the intermediate storage tank will occur. When the second batch of
wastewater is treated and passes through these tanks, this will cause an overflow
of approximately 3,400 L of wastewater from the clarifier to the intermediate
storage tank. In effect, the raw wastewater volume from one batch treatment is
discharged to the intermediate storage tank during the treatment of the subsequent
batch. Some commingling of wastewater batches will occur. However, due to the
"plug-flow" design of the system, samples of the raw wastewater from one run
can be accurately paired with intermediate and final discharge samples of the
subsequent run to determine the approximate pollutant removal efficiency of the
systems. For example, when the Run 2 influent is being processed, samples from
the intermediate storage tank, ion exchange influent, and final treated wastewater
will be collected and the results are paired with the Run 1 influent results.

The collection of samples from each batch treatment event and its relation to test
runs is described in Table 5.

19


-------
Revision 0 - 11/02/01



Test

Raw

EC

Intermediate

Sludge

Ion

Final

Regenerant



Run

Wastewater

Reactor

Treated

Sample

Exchange

Treated

Sample

Batch



Sample

Discharge

Wastewater

Point 4

Diffluent.

Wastewater

Point 7





Point 1

Sample
Point 2

Sample
Point 3



Sample
Point 5

Sample
Point 6



1

Run 1

Ri

ECi

-

-

-

-

-

2

Run
1/2

r2

ec2

Ii



IX]

Fi



3

Run

2/3

r3

ec3

h

"

IX2

f2

"

4

Run 3

R4

-

h

Sl-3

IX3

f3

REG

Table 5. Sampling Identifiers and Sequence for Batch Treatment and Test Runs

3.4.3 Sample Collection and Handling

Samples will be collected from seven sampling points. The locations of the
sampling points are shown in Figure 7. Sampling procedures are described
below. The contents of all tanks will be thoroughly mixed prior to sampling.

?? Raw wastewater (sample point 1). Kaselco has installed a sampling port
(see Figure 10) from which the raw wastewater samples will be collected.
Grab samples of the raw wastewater will be collected 30 minutes (+/- 10
minutes) after initiation of each test run and placed into the appropriate
sample containers. In order to generate a treated wastewater sample for the
final test run, it will be necessary to process a fourth batch of raw wastewater.
A grab sample from this batch will also be collected, since some commingling
of batches will occur. Although this sample will not be paired with a treated
wastewater sample, the analytical results of this sample may be useful during
the evaluation of data. The sampling sequence is described in Table 5.
?? Electrocoagulation reactor discharge (sample point 2). Kaselco has
installed a sampling port from which the electrocoagulation Rx discharge
samples will be collected. Grab samples of the discharge for hexavalent
chromium and other metals analyses will be collected 30 minutes (+/- 10
minutes) after the first and second passes are initiated and placed into the
appropriate sample containers. The electrocoagulation discharge contains
both water and precipitated solids. These samples will be filtered at the
analytical laboratory prior to preservation with acid by the analytical
laboratory.

?? Intermediate treated wastewater (sample point 3). Treated wastewater is
discharged from the clarifier and filter press (separate pipes) to an
intermediate storage tank. This tank cannot be fully drained due to its design.
Therefore, to collect a representative sample, it is necessary to intercept the
incoming flow before it commingles with the water in the intermediate storage
tank. To accomplish this, a five-gal container will be hung inside the storage
tank, above the water level, to intercept the two discharges. The discharges
will enter the container and overflow into the intermediate storage tank. Grab

20


-------
Revision 0 - 11/02/01

samples for hexavalent chromium, other metals, pH, IDS, specific
conductance, O&G, and sulfide will be collected 30-min (+/- 10 minutes)
following initiation of the third pass. Samples will be collected using a glass
ladle to draw treated wastewater from the five-gal container and pour it into
the appropriate sample bottles.

?? Wastewater treatment sludge (sample point 4). After completion of the
three test runs, the filter press will be discharged to the sludge hopper. Grab
samples of the sludge will be collected from the sludge hopper at five separate
points (see Figure 11) using a clean spatula, after first completely mixing the
material. The sludge sample will be placed into 1-L, wide mouth glass jars
and mixed again.

?? Ion Exchange System Influent (sample point 5). Grab samples of influent
to the ion exchange polishing system will be collected from a sampling port
for hexavalent chromium, other metals, pH, IDS, and specific conductance
analyses. The samples will be collected 10 minutes (+/- 5 minutes) after
initiation of the ion exchange treatment cycle.

?? Final treated wastewater (sample point 6). Grab samples of treated
wastewater from the ion exchange polishing system will be collected from a
sampling port. Grab samples will be collected 20 minutes (+/- 5 minutes)
after initiation of the ion exchange treatment process for hexavalent
chromium, other metals, pH, IDS, specific conductance, O&G, and sulfide
analyses.

?? Ion exchange system regenerant (sample point 7). The ion exchange
polishing system is regenerated approximately every 20 days. The regenerant
is collected in a storage lank. A Gull Industries employee, who will be trained
by the ETV-MF Project Manager, will take grab samples of the regenerate
from the storage tank for metals analyses.

Figure 10. Photograph of the Kaselco System Showing Sample Point 1

21


-------
Revision 0 - 11/02/01

Samples will be collected according to the schedule presented in Tables 6 and 7.
All sampling events will be recorded on the form shown in Appendix B.

At the time of sampling, each sample container will be labeled with the date, time,
and sample identification (ID) number. Samples to be analyzed at an off-site
laboratory will be accompanied by a chain of custody (COC) form. The COC
form will provide the following information: project name, project address,
sampler's name, sample numbers, date/time samples were collected, matrix,
required analyses, and appropriate COC signatures. All samples will be
transported in appropriate sample transport containers (e.g., coolers with packing
and blue ice) directly to the laboratory. The transport containers will be secured
with chain of custody tape to ensure sample integrity during the delivery process
to the analytical laboratory. The Project Manager (or trained designee in the case
of ion exchange regenerant) will perform sampling and labeling and ensure that
samples are properly secured and shipped to the laboratory for analysis.

Figure 11. Photograph of the Kaselco System Showing Sample Point 4

3.4.4 Process Measurements and Information Collection

Process measurements and information collection will be conducted to provide
the following data: duration of treatment, volume of wastewater processed,
reagent usage, steel plate (anode) consumption, sludge quantity, electricity use,

22


-------
Revision 0 - 11/02/01

and O&M activities. The methods that will be used for process measurements
and information collection are discussed in this section.

3.4.4.1 Duration of Treatment and Wastewater Volume Processed

The duration of each treatment cycle will be measured by recording the
start and stop times for both the Kaselco and ion exchange polishing
systems onto the data collection form found in Appendix B The volume
of wastewater processed during each batch will be measured after the first
pass using the graduated scale found on storage tanks 1 and 2.

Sample

Sample Location

Frequency/Type

Parameters

Raw wastewater

Sample point 1 (sample
port)

One/test pass, plus a sample
from the fourth batch. Grab
sample collected after 30
min. (+/-10 min.) of
initiation of test run.

TSS, TOC, cadmium,
chromium (+6), chromium (T),
copper, iron, lead, manganese,
molybdenum, nickel, tin, zinc,
TDS, O&G, sulfide, pH

electrocoagulation
reactor discharge

Sample point 2 (sample
port)

One/test pass. Grab sample
collected after 30 min. (+/-
10 min.) of initiation of test
run.

cadmium, chromium (+6),
chromium (T), copper, iron,
lead, manganese,
molybdenum, nickel, tin, zinc,
PH

Intermediate
treated wastewater

Sample point 3
(container located in
mouth of intermediate
storage tank)

One/test pass. Grab sample
collected after 30 min. (+/-
10 min.) of initiation of test
run.

TSS, TOC, cadmium,
chromium (+6), chromium (T),
copper, iron, lead, manganese,
molybdenum, nickel, tin, zinc,
TDS, O&G, sulfide, pH,
specific conductance

Sludge

Sample point 4 (sludge
hopper)

One/verification test.
Representative grab sample
collected after completion of
the test runs.

% solids, density, cadmium,
chromium, copper, iron, lead,
manganese, molybdenum,
nickel, tin, zinc

Ion exchange
system influent

Sample point 5 (sample
port)

One/test run. Grab sample
collected after 15 min. (+/ - 5
min.) of initiation of test run.

TSS, TDS, TOC, cadmium,
chromium (+6), chromium (T),
copper, iron, lead, manganese,
molybdenum, nickel, tin, zinc,
TDS, O&G, sulfide, pH,
specific conductance

Final treated
wastewater

Sample point 6 (sample
port)

One/test run. Grab sample
collected after 20 min. (+/ - 5
min.) of initiation of test run.

TSS, TDS, TOC, cadmium,
chromium (+6), chromium (T),
copper, iron, lead, manganese,
molybdenum, nickel, tin, zinc,
TDS, O&G, sulfide, pH,
specific conductance

Ion exchange
system regenerant

Sample point 7 (storage
tank)

One/verification test.
Representative grab sample
collected after completion of
the ion exchange system
regeneration.

cadmium, chromium (+6),
chromium (T), copper, iron,
lead, manganese,
molybdenum, nickel, tin, zinc

Table 6. Sampling Locations, Frequency, and Parameters

23


-------
Revision 0 - 11/02/01

3.4.4.2	Polymer Usage Data

The quantity of polymer used by the Kaselco system will be measured and
recorded after completion of the verification test. This will be
accomplished by subtracting the quantity of polymer in the feed tank at the
start and completion of the verification test (four batches). Measuring the
height of the polymer in the cylindrical feed tank and calculating the
volume using the formula for a right circular cylinder will determine the
quantity of polymer. The depth of polymer at the start and completion of
the verification test will be entered into the form in Appendix B.

3.4.4.3	Volume of Ion Exchange Regenerant

The ion exchange polishing system will be regenerated prior to the
verification test in order to initialize the system and to determine the
volume of regenerant produced. During regeneration, the columns are
flushed with hydrochloric acid (cation column), sodium hydroxide (anion
columns), and water. These solutions are combined into a single storage
tank. The storage tank will be emptied prior to testing. The depth of
regenerant at the completion of the ion exchange cycle will be entered into
the form in Appendix B. The volume of wastewater processed during
each batch will be measured after the first pass using the graduated scale
found on storage tank 3.

3.4.4.4	Ion Exchange System Regeneration Chemical Use

The quantity of hydrochloric acid and sodium hydroxide used by the ion
exchange polishing system for regeneration will be determined after
completion of the system regeneration described in section 3.4.4.3. This
will be accomplished by subtracting the quantity of hydrochloric acid and
sodium hydroxide in their respective feed tanks at the start and completion
of the ion exchange cycle. Measuring the height of the hydrochloric acid
and sodium hydroxide in the cylindrical feed tanks and the circumferences
of the tanks and calculating the volume using the formula for a right
circular cylinder will determine the quantity of hydrochloric acid and
sodium hydroxide. The depths of hydrochloric acid and sodium hydroxide
at the start and completion of the ion exchange cycle will be entered into
the form in Appendix B.

3.4.4.5	pH

The pH provides a general indication of the acidity or alkalinity of a
wastewater. It is also a regulated parameter for most dischargers. The pH
of the influent and effluent samples will be determined by using a digital
meter (electrometric). The digital meter will be calibrated using pH 4 and
10 buffers, and the calibration verified with a pH 7 buffer. The ETV-MF

24


-------
Revision 0 - 11/02/01

Project Manager will record the manufacturer, lot number and the
expiration date of the buffer in the field notebook.

Sample
Location/Parameters

Bottle Type

Batch
1

Batch
2

Batch
3

Batch
4

Total
Sample

Raw Wastewater (Sample point 1)

TOC

125 mL amber glass bottle (4 each)

3**

1

1

1

6

Cr^, TSS, TDS, pH,
specific conductance

500 mL plastic bottle

3**

1

1

1

6

Metals*

500 mL plastic bottle

3**

1

1

1

6

O&G as (HEM)

1,000 mL wide mouth glass jar (2
each)

3**

1

1

1

6

Sulfide

250 mL plastic bottle

3**

1

1

1

6

EC Reactor Discharge (Sam

pie point 2)

Cr*, pH

500 mL plastic bottle

3

9**

3

-

15

Metals*

500 mL plastic bottle

3

9**

3

-

15

Intermediate Treated Wastewater (Sample point 3)

TOC

125 mL amber glass bottle (4 each)

-

3**

1

1

5

Cr^, TSS, TDS, pH,
specific conductance

500 mL plastic bottle

-

3**

1

1

5

Metals*

500 mL plastic bottle

-

3**

1

1

5

O&G as (HEM)

1,000 mL wide mouth glass jar (2
each)

-

3**

1

1

5

Sulfide

250 mL plastic bottle

-

3**

1

1

5

Sludge (Sample point 4)

Metals*, % solids, density

1,000 mL wide mouth glass jar





3**

3

Ion exchange Influent (Sample point 5)

TOC

125 mL amber glass bottle (4 each)

-

1

1

1

3

Cr^, TSS, TDS, pH,
specific conductance

500 mL plastic bottle

-

1

1

1

3

Metals*

500 mL plastic bottle

-

1

1

1

3

O&G as (HEM)

1,000 mL wide mouth glass jar (2
each)

-

1

1

1

3

Sulfide

250 mL plastic bottle

-

1

1

1

4

Final Treated Wastewater (Sample point 6)

TOC

125 mL amber glass bottle (4 each)

-

1

1

3**

5

Cr^, TSS, TDS, pH,
specific conductance

500 mL plastic bottle

-

1

1

3**

5

Metals*

500 mL plastic bottle

-

1

1

3**

5

O&G as (HEM)

1,000 mL wide mouth glass jar (2
each)

-

1

1

3**

5

Sulfide

250 mL plastic bottle

-

1

1

3**

5

Regenerant (Sample point 7)

Cr^

500 mL plastic bottle

-

-

-

1

1

Metals*

500 mL plastic bottle

-

-

-

1

1

* Cadmium, chromium (T), copper, iron, lead, manganese, molybdenum, nickel, tin, and zinc.

**Includes duplicate and matrix spike.

Table 7. Sample Quantities from Each Sampling Point

25


-------
Revision 0 - 11/02/01

3.4.4.5	Quantity of Sludge

The quantity of sludge generated will be measured at the end of the
verification test. This will be accomplished by transferring the sludge that
is discharged from the filter press into an empty drum, measuring the
height of the sludge and the circumference of the drum and calculating the
sludge volume using the formula for a right circular cylinder. The height
of sludge in the drum will be recorded on the form found in Appendix B
The analytical laboratory will determine the density of the sludge, and the
mass of sludge will be calculated by multiplying the sludge volume by its
density.

3.4.4.6	Electricity Use Data

Electricity use will be calculated by determining the input power
requirements of pumps, the rectifier, and other powdered devices
associated with the Kaselco system and ion exchange polishing system.

3.4.4.7	System Operation and Maintenance Data

System operation and maintenance activities will be observed during each
test run. Any non-routine operational or maintenance procedures
performed will be documented. This includes changes to the flow rate or
chemical feed rate, filter replacement, and similar activities. Labor
requirements (hrs.) will also be recorded. The team leader will record
notes pertaining to these activities on the data form in Appendix B.

3.4.4.8	Cost Data

Gull Industries will provide the cost data for electricity, labor, chemical
reagents, and sludge disposal. Gull Industries will also provide one month
of historical data for chemical reagent use and volumes of wastewater
treated.

3.4.4.9	Steel Plate Consumption

Steel plate consumption is relatively slow and cannot be accurately
measured during the short duration of the verification test. Therefore, six
months of historical data will be collected from Gull Industries regarding
steel plate consumption.

3.4.4.10	Ion Exchange System Operational Data

Data from the internal logging system of the ion exchange unit will be
used to provide operational data (non-critical). The system has the
following parameters monitored and continuously logged to disc:

26


-------
Revision 0 - 11/02/01

??	Inlet specific conductance (? S)

??	pH

??	Pump discharge pressure (psi)

??	Flow(gpm)

??	Outlet specific conductance (? S)

All parameters are logged by RS View Trend software for subsequent
analysis and archived for viewing at a later date. All events are date and
time stamped. Gull Industries will provide these data to the ETV Project
Manager at the completion of the test in a spreadsheet format.

3.5 Analytical Procedures

All analytical procedures that will be used during this verification test are EPA methods
or other recognized methods. A summary of analytical tests is presented in Table 8.

Parameter

Test Method

Preservation/Handling

Hold Time

Metals
(dissolved)

EPA 200.7

Cool storage
(<4?C)

pH<2 w/HN03

6 months

Metals
(sludge)

SW-846
3050B/6010B

cool storage (<4°C)

6 months

Chromium
(hexavalent)

SW-846
7196A

cool storage (<4°C)

24 hours

O&G (as HEM)

EPA Method 1664

cool storage (<4°C)
pH<2 w/HN03

28 days

pH

digital meter

N/A

analyze
immediately

sulfide (S)

EPA Method 376.2

cool storage (<4°C)
zinc acetate + NaOH to
pH >12

7 days

TDS

EPA Method 160.1

cool storage (<4°C)

7 days

TOC

EPA Method 415.1

cool storage (<4°C)
acidify to pH <2 w/HN03

28 days

TSS

EPA Method 160.2

cool storage (<4°C)

7 days

specific
conductance

EPA Method 120.1

cool storage (<4?C)

28 days

sludge % water

Karl-Fisher

cool storage (<4°C)

28 days

sludge % density

SM2710F

cool storage (<4°C)

28 days

Table 8. Summary of Analytical Tests and Requirements

27


-------
Revision 0 - 11/02/01

QUALITY ASSURANCE/QUALITY CONTROL REQUIREMENTS

Quality Assurance/Quality Control activities will be performed according to the
applicable section of the Environmental Technology Verification Program Metal
Finishing Technologies Quality Management Plan (ETV-MF QMP) [Ref. 4],

4.1	Quality Assurance Objectives

The first QA objective is to ensure that the process operating conditions and test methods
are maintained and documented throughout each test and laboratory analysis of samples.
The second QA objective is to use standard test methods (where possible) for laboratory
analyses. The test methods to be used are listed in Table 8.

4.2	Data Reduction, Validation, and Reporting
4.2.1 Internal Quality Control Checks

Raw Data Handling. Raw data are generated and collected by laboratory analysts
at the bench and/or sampling site. These include original observations, printouts,
and readouts from equipment for sample, standard, and reference QC analyses.
Data are collected both manually and electronically. At a minimum, the date,
time, sample ID, raw signal or processed signal, and/or qualitative observations
will be recorded. Comments to document unusual or non-standard observations
also will be included on the forms, as necessary. The form presented in
Appendix B will be used for recording data on-site.

The on-site Project Team member will generate COC forms, and these forms will
accompany samples when they are shipped off-site.

Raw data will be processed manually by the analyst, automatically by an
electronic program, or electronically after being entered into a computer. The
analyst will be responsible for scrutinizing the data according to laboratory
precision, accuracy, and completeness policies. Raw data bench sheets and
calculation or data summary sheets will be kept together for each sample batch.
From the standard operating procedure and the raw data bench files, the steps
leading to a final result may be traced. The ETV-MF Project Manager will
maintain process-operating data for use in verification report preparation.

Data Package Validation. The generating analyst will assemble a preliminary data
package, which shall be initialed and dated. This package shall contain all QC
and raw data results, calculations, electronic printouts, conclusions, and
laboratory sample tracking information.

A second analyst will review the entire package and check sample and storage
logs, standard logs, calibration logs, and other files, as necessary, to ensure that
all-tracking, sample treatments, and calculations are correct. After the package is

28


-------
Revision 0 - 11/02/01

reviewed in this manner, a preliminary data report will be prepared, initialed, and
dated. The entire package and final report will be submitted to the Laboratory
Manager (LM).

The LM shall be ultimately responsible for all final data released from the
laboratory. The LM or designee will review the final results for adequacy to task
QA objectives. If the manager or designee suspects an anomaly or non-
concurrence with expected or historical performance values, or with task
objectives for test specimen performance, the raw data will be reviewed, and the
generating and reviewing analysts queried. If suspicion about data validity still
exists after internal review of laboratory records, the manager will authorize a re-
test. If sufficient sample is not available for re-testing, a re-sampling shall occur.
If the sampling window has passed, or re-sampling is not possible, the manager
will flag the data as suspect. The LM signs and dates the final data package.

Data Reporting. A report signed and dated by the LM will be submitted to the
ETV-MF Project Manager. The ETV-MF Project Manager will decide the
appropriateness of the data for the particular application. The final report
contains the laboratory sample ID, date reported, date analyzed, the analyst, the
standard operating procedure (SOP) used for each parameter, the process or
sampling point identification, the final result, units, and all QC data generated.
The CTC ETV-MF Program Manager shall retain the data packages as required
by the ETV-MF QMP [Ref. 4],

4.2.2 Calculation of Data Quality Indicators

Analytical performance requirements are expressed in terms of precision,
accuracy, representativeness, comparability, completeness, and sensitivity
(PARCCS). Summarized below are definitions and QA objectives for each
PARCCS parameter.

One sample from each sampling point shall be submitted with a field duplicate.
All analytes from this sample will have matrix spike and matrix spike duplicate
analyses performed.

4.2.2.1 Precision

Precision is a measure of the agreement or repeatability of a set of
replicate results obtained from duplicate analyses made under identical
conditions. Precision is estimated from analytical data and cannot be
measured directly. The precision of a duplicate determination can be
expressed as the relative percent difference (RPD), and calculated as:

29


-------
Revision 0 - 11/02/01

RPD = {(|Xi - X2|)/(Xi + X2)/2} x 100% =

where:

Xi = larger of the two observed values
X2 = smaller of the two observed values

Multiple determinations will be performed for each test on the same test
specimen. The replicate analyses must agree within the relative percent
deviation limits provided in Table 8.

4.2.2.2 Accuracy

Accuracy is a measure of the agreement between an experimental
determination and the true value of the parameter being measured.
Accuracy is estimated through the use of known reference materials or
matrix spikes. It is calculated from analytical data and is not measured
directly. Spiking of reference materials into a sample matrix is the
preferred technique because it provides a measure of the matrix effects on
analytical accuracy. Accuracy, defined as percent recovery (P), is
calculated as:

Analyses will be performed with periodic calibration checks with
traceable standards to verily instrumental accuracy. These checks will be
performed according to established procedures in the contracted
laboratory(s) that have been acquired for this verification test. Analysis
with spiked samples will be performed to determine percent recoveries as
a means of checking method accuracy. QA objectives will be satisfied if
the average recovery is within the goals described in Table 9.

4.2.2.3 Completeness

Completeness is defined as the percentage of measurements judged to be
valid compared to the total number of measurements made for a specific

P = 9	?

??SSR-SR??

?x 100%

f} SA f}

where:

SSR = spiked sample result
SR = sample result (native)

S A = the concentration added to the spiked sample

30


-------
Revision 0 - 11/02/01

sample matrix and analysis. Completeness is calculated using the
following formula:

Completeness = Valid Measurements ? 100%

Total Measurements

Experience on similar projects has shown that laboratories typically
achieve about 95 percent completeness. QA objectives will be satisfied if
the overall percent completeness is 95 percent or greater as specified in
Table 9

31


-------
Revision 0 - 11/02/01

Critical
Measurements

Matrix

EPA Test Method

Reporting
Units

Method of
Determination

MRL

Precision
(RPD)

Accuracy (%
Recovery)

Completeness

(%)

cadmium

water

200.7 (water)
3050B/6010B (sludge)

mg/L

ICP

.005

<30

80 - 120

90

chromium (T)

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.010

<30

80 - 120

90

copper

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.010

<30

80 - 120

90

iron

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.400

<30

80 - 120

90

lead

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.010

<30

80 - 120

90

manganese

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.030

<30

80 - 120

90

molybdenum

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.020

<30

80 - 120

90

nickel

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.020

<30

50-150

90

O&G (as HEM)

water

1664

mg/L

gravimetric

5.0

<30

50-150

90

PH

water

150.1

std. units

electrometric

0.1

<30

?0.2pH units

90

sulfide (S)

water

376.2

mg/L

colormetric

5.0

<30

80 - 120

90

total solids

sludge

160.3



gravimetric

1.0

<30

-

90

TDS

water

160.1

mg/L

gravimetric

10

<30

-

90

TOC

water

415.1

mg/L

combustion/
oxidation

1.0

<30

-

90

tin

water/
sludge

200.7 (water)
3050B/6010B (sludge)

mg/L

ICP

.020

<30

80 - 120

90

TSS

water

160.2

mg/L

gravimetric

1.0

<30

-

90

zinc

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.030

<30

80 - 120

90

chromium
(hexavalent)

water

3050B/7196A

mg/L

colorimetric

.015

<30

80 - 120

90

silver

water/
sludge

200.7(water)
3050B/6010B (sludge)

mg/L

ICP

.010

<30

80 - 120

90

specific conduct.

water

200.7 (water)
3050B/6010B (sludge)

?S

Wheatstone bridge

.01

<30



90

Table 9. QA Objectives

32


-------
Revision 0 - 11/02/01

4.2.2.4	Comparability

Comparability is another qualitative measure designed to express the
confidence with which one data set may be compared to another. Sample
collection and handling techniques, sample matrix type, and analytical
method all affect comparability. Comparability is limited by the other
PARCCS parameters because data sets can be compared with confidence
only when precision and accuracy are known. Comparability will be
achieved in this technology verification by the use of consistent methods
during sampling and analysis and by traceability of standards to a reliable
source.

4.2.2.5	Representativeness

Representativeness refers to the degree to which the data obtained from
the sample accurately and precisely represent the conditions or
characteristics of the population as a whole. For the purposes of this
demonstration, representativeness will be achieved by presenting identical
analyte samples to the specified lab(s) and executing consistent sample
collection and mixing procedures. Three identical samples (one each of
influent, effluent, and sludge) will be collected during the course of the
verification test. Representativeness will be satisfied if the analytical
results for each parameter are within 30 percent of the results for the
associated duplicate sample.

4.2.2.6	Sensitivity

Sensitivity is the measure of the concentration at which an analytical
method can positively identify and report analytical results. The
sensitivity of a given method is commonly referred to as the detection
limit. Although there is no single definition of this term, the following
terms and definition of detection will be used for this program.

Instrument Detection Limit (IDL) is the minimum concentration that can
be measured from instrument background noise.

Method Detection Limit (MDL) is a statistically determined
concentration. It is the minimum concentration of an analyte that can be
measured and reported with 99 percent confidence that the analyte
concentration is greater than zero as determined in the same or a similar
matrix. (Because of the lack of information on analytical precision at this
level, sample results greater than the MDL but less than the practical
quantification limit (PQL) will be laboratory qualified as "estimated.")

33


-------
Revision 0 - 11/02/01

MDL is defined as follows for all measurements:

MDL - t(n-l,l-? = 0.99) xs

where: MDL =

t(n-l,l-? = O.99) =

S =

method detection limit
students t-value for a one-sided 99 percent
confidence level and a standard deviation
estimate with n-1 degrees of freedom
standard deviation of the replicate analyses

Method Reporting Limit (MRL) is the concentration of the target analyte
that the laboratory has demonstrated the ability to measure within
specified limits of precision and accuracy during routine laboratory
operating conditions. (This value is variable and highly matrix dependent.
It is the minimum concentration that will be reported without
qualifications by the laboratory.)

4.3 Additional Data Calculations

4.3.1 Ability to Meet Metal Finishing and Proposed Target Levels

The results of each test cycle will be compared to the applicable metal finishing
limitations (Table 10) and target level limitations (Table 11). To meet a metal
finishing or MP&M limit, the analytical result must be equal to or below the
corresponding daily maximum limit.5 The comparison will be made on a
parameter-by-parameter basis for each cycle. The applicable limitations are the
pretreatment standards for existing sources for the metal finishing category (40
CFR 433.15) and proposed pretreatment standards for existing sources for the
MP&M Job Shop subcategory (66 FR 423).

Parameter

Metal Finishing Category (40 CFR 433.15)

Daily Max., mg/L

Monthly Avg., mg/L

Cadmium

0.69

0.26

Chromium

2.77

1.71

Copper

3.38

2.07

Lead

0.69

0.43

Nickel

3.98

2.36

Zinc

2.61

1.48

Table 10. Applicable Pretreatment Standards for Existing Sources for the
Metal Finishing Category (40 CFR 433)

5 It is anticipated that for certain parameters the influent concentration will be below the discharge limit. These
instances will be identified during data reduction and reported as such in the verification report.

34


-------
Revision 0 - 11/02/01

Parameter

Target Levels

Daily Max., mg/L

Monthly Avg., mg/L

Cadmium

0.21

0.09

Chromium

1.3

0.55

Copper

1.3

0.57

Lead

0.12

0.09

Manganese

0.25

0.10

Molybdenum

0.79

0.49

Nickel

1.5

0.64

Tin

1.8

1.4

Zinc

0.35

0.17

O&G (as HEM)

52

26

TOC

78

59

Sulfide (as S)

31

13

O&G (as HEM) is not regulated under pretreatment standards for the Job Shop subcategory. However, it
is regulated under the BPT limitations for direct dischargers in the Job Shop subcategory (66 FR 424).
The values shown are the BPT proposed limitations.

Table 11. Proposed Target Levels
4.3.2 Mass Balance

Mass balance calculations will be performed for chromium (T) and nickel, which
are the two metal parameters of greatest significance at Gull Industries. The mass
balance will be performed only for the Kaselco system since the ion exchange
system will not be tested over a full cycle. The mass balance results will be used
as an indicator of the accuracy of the verification test. The mass balance criterion
will be satisfied when the mass balance is within the range of 75 percent to 125
percent. The equation for the chromium mass balance is shown below. The
nickel mass balance equation will be similar.

mass bal. (%) = [((Ce x Ve) + (Cs x Vs))/(Ci x Vi)] x 100%

where: Ce = intermediate treated wastewater chromium
concentration (mg/L)

VE = intermediate treated wastewater volume
processed during the test period (L)

Cs = filter press sludge chromium concentration
(mg/L)

Vs = filter press sludge volume generated during the
test period (L)

Ci = raw wastewater chromium concentration
(mg/L)

Vi = raw wastewater volume processed during the
test period (L)

35


-------
Revision 0 - 11/02/01

4.3.3	Pollutant Removal Efficiency

The pollutant removal efficiency is calculated based on a comparison of raw
wastewater and treated wastewater concentrations for each pollutant parameter
and each test run. The equation for zinc removal is shown below. The removal
efficiency rate for each pollutant parameter will be separately calculated. These
include: O&G (as HEM), TOC, cadmium, hexavalent chromium, chromium (T),
copper, lead, manganese, molybdenum, nickel, sulfide (as S), tin, and zinc.

Zremove (%) —

[((Zi X Vi) - (ZE X VE)) / (Zi X Vi)] X 100%

where:

Zremove = zinc removal efficiency

Zi = raw wastewater zinc concentration (mg/L)
Vi = raw wastewater volume processed during the
test cycle (L)

ZE = treated wastewater zinc concentration (mg/L)
Ve = treated wastewater volume processed during
the test cycle (L)

As a result of its design, the Kaselco system retains a volume of wastewater in the
treatment system tanks approximately equal to the volume of one batch. The
tanks operate as a plug-flow reactor; as a batch of wastewater is processed
through the tanks, the existing wastewater in the tanks is pushed through the
system and is discharged to the final storage tank. To account for this design, the
treated wastewater samples (E) will be paired with the raw wastewater samples
(R) from the previous batch as described in Table 4.

4.3.4	Reusability of Treated Wastewater

The reusability of the treated wastewater as process water will be determined by
comparing the results of the pH and specific conductance analytical tests of the
final treated water to standards used by Gull Industries for water reuse. Treated
water meeting both of these standards will be deemed reusable. The Gull
Industries standards are:

?? Specific conductance: maximum of 500 ? S
?? pH: within the range of 5.0 to 9.0 standard units
?? TDS: maximum of 250 mg/L

4.3.5	Energy Use

Energy requirements for the Kaselco and ion exchange polishing systems will be
calculated by summing the total quantity of horsepower (hp) hours for each
system and dividing by 1.341 HP-hr/kWh to arrive at electricity needs. The
energy requirements will be calculated separately for each system.

36


-------
Revision 0 - 11/02/01

4.3.6 Cost Analysis

This analysis will determine the operating cost of the Kaselco and ion exchange
polishing systems considering the following cost parameters: chemical reagents,
steel plates, other materials (e.g., filters), electricity, labor, and sludge
management. Costs will be calculated and expressed in dollars per thousand liters
processed ($/1000 L) by dividing the cost by the total volume of wastewater
processed during the verification test. Total costs will be calculated separately for
each system by summing the individual cost elements. The calculation of
treatment cost for either system is shown below.

C

treat cost

= (R + A + M + E + L + S)/V

where: Ctreatcost	=	cost of treatment ($/1000 L)

R	=	cost of chemical reagents used ($/1000 L)

A	=	cost of steel plates consumed ($/l 000 L)

M	=	cost of materials used ($/1000 L)

E	=	cost of electricity used ($/1000L)

L	=	cost of labor ($/l 000 L)

S	=	cost of sludge management ($/l 000 L)

V	=	volume of wastewater processed during the
verification test (1000 L)

4.3.7 Sludge Generation Analysis

The quantity of sludge generated will be measured at the end of the verification
test as described in section 3.4.4.5. The quantity will be expressed as volume of
sludge generated (wet basis) and weight of sludge generated (wet and dry basis).
The weight of the sludge on a dry-weight basis will be calculated as follows:

Sdry = (Swet X % Solids) X / 100%

where: Sdry =

Swet

" D solids =

dry weight of sludge

wet weight of sludge as measured during
verification test

percent solids from lab analysis of sludge

4.3.8 Environmental Benefit

This analysis will quantify the environmental benefit of the Kaselco/ion exchange
polishing technologies installed at Gull Industries by determining the quantity of
regulated pollutants removed beyond the level required by the metal finishing
regulations (40 CFR 433).

37


-------
Revision 0 - 11/02/01

Pb =
where: Pb =

Pv =

Ph =

4.4	Test Plan Modifications

In the course of verification testing, it may become necessary to modify tie test plan due
to unforeseen events. These modifications will be documented using a Test Plan
Modification Request (Appendix Q that must be submitted to the CTC Project Manager
for approval. Upon approval, the modification request will be assigned a number,
logged, and transmitted to the requestor for implementation.

4.5	Quality Audits

Technical System Audits. An audit will be performed during verification testing by the
CTC QA Manager according to section 2.9.3 Technical Assessments of the ETV-MF
QMP [Ref. 4] to ensure testing and data collection are performed according to the test
plan requirements. In addition to the CTC Technical System Audit (TSA), the EPA QA
Manager may also conduct an audit to assess the quality of the verification test.

Internal Audits. In addition to the internal laboratory quality control checks, internal
quality audits will be conducted to ensure compliance with written procedures and
standard protocols.

Corrective Action. Corrective action for any deviations to established QA and QC
procedures during verification testing will be performed according to section 2.10 Quality
Improvement of the ETV-MF QMP [Ref. 4],

Laboratory Corrective Action. Examples of non-conformances include invalid
calibration data, inadvertent failure to perform method-specific QA, process control data
outside specified control limits, failed precision and/or accuracy indicators, etc. Such
non-conformances will be documented on a standard laboratory form. Corrective action
will involve taking all necessary steps to restore a measuring system to proper working

Pv-Ph

the quantity of regulated pollutants removed
beyond the level required (gram (g)/1000 L)
sum of allowable pollutant discharged (g/1000
L) (calculated by multiplying the daily
maximum limit times the volume of
wastewater processed and summing over all
regulated parameters)

sum of actual pollutant mass discharged during
verification test (g/1000 L) (calculated by
multiplying the average final concentration for
the three test runs times the volume of
wastewater processed and summing over all
regulated parameters.)

38


-------
Revision 0 - 11/02/01

order and summarizing the corrective action and results of subsequent system
verifications on a standard laboratory form. Some non-conformances are detected while
analysis or sample processing is in progress and can be rectified in real time at the bench
level. Others may be detected only after a processing trial and/or sample analyses are
completed. Typically, the LM detects these types of non-conformances. In all cases of
non-conformance, the LM will consider sample re-analysis as one source of corrective
action. If insufficient sample is available or the holding time has been exceeded,
complete re-processing may be ordered to generate new samples if a determination is
made by the Project Manager that the non-conformance jeopardizes the integrity of the
conclusions to be drawn from the data. In all cases, a non-conformance will be rectified
before sample processing and analysis continues.

5.0 PROJECT MANAGEMENT

5.1 Organization/Personnel Responsibilities

The ETV-MF Project Team that is headed by CTC will conduct the evaluation of the
Kaselco and ion exchange polishing systems. The CTC ETV-MF Program Manager,
Donn Brown, will have ultimate responsibility for all aspects of the technology
evaluation. The ETV-MF Project Manager assigned to this evaluation is George
Cushnie. Mr. Cushnie and/or his staff member will be on-site throughout the series of
batch treatments and will conduct or supervise all sampling and related measurements,
with one exception.6 The operating cycle of the ion exchange polishing system will
extend beyond the testing of the Kaselco system and the ETV-MF team will no longer be
on-site. At the end of the operating cycle, a Gull Industries employee will collect a
sample of the ion exchange regenerate from the storage tank (sample point 7) and ship
the sample to the laboratory. The ETV-MF Project Manager will train the Gull Industries
employee with regard to sampling protocol, sample preservation, and chain of custody.

Paul Morkovsky will head the Kaselco staff. He will be on call throughout the entire test
period to answer questions concerning operation of the system.

Gull Industries personnel will be responsible for operating the Kaselco and ion exchange
polishing systems and providing historical wastewater volume and cost information. Gull
Industries will also be responsible for the disposal of all residuals generated during the
verification test.

Severn Trent Laboratories (STL) in Houston, Texas, is responsible for analyzing
verification test samples. The LM, Jodi Romine, will be point of contact (POC). The
State of Texas approves STL for the analyses identified in this test plan.

The ETV-MF Project Manager and Gull Industries (host facility) have the authority to
stop work when unsafe or unacceptable quality conditions arise. The CTC ETV-MF

6 The CTC ETV-MF Program Manager, Donn Brown, will make a determination as to the qualifications of any staff
member assigned to the project. This will occur prior to testing.

39


-------
Revision 0 - 11/02/01

Program Manager will provide periodic assessments of verification testing to the EPA
ETV Center Manager.

6.0 EQUIPMENT AND UTILITY REQUIREMENTS

The Kaselco system and ion exchange polishing system are permanently installed at Gull
Industries. The only utility requirements for operating the systems are electricity,
compressed air, and city water.

7.0 HEALTH AND SAFETY PLAN

This Health and Safety Plan provides guidelines for recognizing, evaluating, and
controlling health and physical hazards throughout the workplace. More specifically, the
Plan specifies for assigned personnel the training, materials, and equipment necessary to
protect themselves from hazards created by chemicals, and any waste generated by the
process.

7.1	Hazard Communication

All personnel assigned to the project will be provided with the potential hazards, signs
and symptoms of exposure, methods or materials to prevent exposures, and procedures to
follow if there is contact with a particular substance. The Gull Industries (host facility)
Hazard Communication Program will be reviewed during training and will be reinforced
throughout the test period. All appropriate Material Safety Data Sheet(s) (MSDS) forms
will be available for chemical solutions used during testing.

7.2	Emergency Response Plan

Gull Industries (host facility) has a contingency plan to protect employees, assigned
project personnel, and visitors in the event of an emergency at the facility. This plan will
be used throughout the project. All assigned personnel will be provided with information
about the plan during training.

7.3	Hazard Controls Including Personal Protective Equipment

All assigned project personnel will be provided with appropriate personal protective
equipment (PPE) and any training needed for its proper use, considering their assigned
tasks. The use of PPE will be covered during training as indicated in section 9.0.

The following PPE will be required and must be worn at all times while in the Gull
Industries (host facility) facility: eyeglasses with side splashguards.

7.4	Lockout/Tagout Program

The Kaselco and ion exchange polishing systems are fully installed. There is no need for
implementation of a lockout/tagout program.

40


-------
Revision 0 - 11/02/01

7.5	Material Storage

Any materials used during the project will be kept in proper containers and labeled
according to Gull Industries requirements. Proper storage of the materials will be
maintained based on associated hazards. Spill trays or similar devices will be used as
needed to prevent material loss to the surrounding area.

7.6	Safe Handling Procedures

All chemicals and wastes or samples will be transported on-site in non-breakable
containers used to prevent spills. Spill kits will be strategically located in the project
area. These kits contain various sizes and types of sorbents for emergency spill clean up.
Emergency spill clean up will be performed according to the Emergency Response Plan.

8.0 WASTE MANAGEMENT

The Kaselco and ion exchange polishing systems will process wastewater generated by
manufacturing operations at Gull Industries. After processing, the effluent from
treatment will be transferred to the existing Gull Industries storage tanks and
subsequently reused as process water and/or discharged to the Houston Publicly Owned
Treatment Works (POTW). Any residuals generated by the Kaselco or ion exchange
polishing systems will be managed by Gull Industries in accordance with Federal, state,
and local laws. Prior to testing, local and state authorities will be notified of the
verification test.

9.0 TRAINING

It is important that the verification activities performed by the ETV-MF Program be
conducted with high quality and with regard to the health and safety of tie workers and
the environment. By identifying the quality requirements, worker safety and health, and
environmental issues associated with each verification test, the qualifications or training
required for personnel involved can be identified. Training requirements will be
identified using the Job Training Analysis (JTA) Plan [Ref. 5],

The purpose of this JTA Plan is to outline the overall procedures for identifying the
hazards and quality issues and training needs for each verification test project. This JTA
Plan establishes guidelines for creating a work atmosphere that meets the quality,
environmental, and safety objectives of the ETV-MF Center. The JTA Plan describes the
method for studying ETV-MF project activity and identifying training needs. The ETV-
MF Operation Planning Checklist (Appendix D) will be used as a guideline for
identifying potential hazards, and the JTA Form (Appendix E) will be used to identify
training requirements. After completion of the form, applicable training will be
performed. Training will be documented on the ETV-MF Project Training Attendance
Form (Appendix F). Health and safety training will be coordinated with Gull Industries
personnel.

41


-------
Revision 0 - 11/02/01

10.0 REFERENCES

1)	EPA, Effluent Limitations Guidelines, Pretreatment Standards, and New Source
Performance Standards for the Metal Finishing Point Source Category (40 CFR
433).

2)	EPA, Effluent Limitations Guidelines, Pretreatment Standards, and New Source
Performance Standards for the Metal Products and Machinery Point Source
Category; Proposed Rule (66 FR 424, January 3, 2001).

3)	Cushnie, George C., Pollution Prevention and Control for Plating Operations,
National Center for Manufacturing Sciences, Ann Arbor, MI, 1994.

4)	Concurrent Technologies Corporation, "Environmental Technology Verification
Program Metal Finishing Technologies (ETV-MF) Quality Management Plan,"
Rev. 1, March 26, 2001.

5)	Concurrent Technologies Corporation, "Environmental Technology Verification
Program Metal Finishing Technologies (ETV-MF) Pollution Prevention
Technologies Pilot Job Training Analysis Plan" May 10, 1999.

11.0 DISTRIBUTION

Alva Daniels, EPA (3)

J. Kelly Mowry, Gull Industries

Jerry Givens, Gull Industries

Paul Morkovsky, Kaselco

Ian TunniclilFe, Lobo Liquids

George Cushnie, CAI Resources, Inc. (2)

Donn Brown, CTC {3)

Clinton Twilley, CTC

Jodi Romine, Severn Trent Laboratories

42


-------
APPENDIX A

Operating Procedures for Kaselco System


-------
OPERATING PROCEDURES

The elctrocoagulation process uses electrical current to bind undesirable molecules of chemicals
in water to each other and to the materials in the reactor cell. The undesirable chemicals in the
reacted fluid are then removed by precipitation or filtering. Your unit is constructed with steel
plates, and is specifically designed for removal of heavy metals. The amount of energy required
depends on the fluid being processed. The typical waste from a rinsing operation will contain
less than 10 ppm of heavy metals. This system is designed to process up to 20 times that
concentration.

Beginning at too low current (voltage and amperage), the unit will not have a visible effect on
the solution. As the current is increased, treatment begins, along with some gas evolution,
principally hydrogen and oxygen. A floe of agglomerated particles becomes visible and settles
when the solution is left standing. A further increase in energy will cause more thorough and
rapid treatment with excessive evolution of gas. This gas causes the floe initially to rise rather
than settle. As the amount of gas generation increases, the durability of the floe increases along
with a decrease in its density. Floe generated at an excessive voltage will quickly rise above the
liquid as foam and, depending on the fluid's components, may not settle without significant
agitation. The ideal energy level will treat the waste with only minor foaming.

Some waste streams, such as oils and fats, may be best treated using excessive energy,
intentionally causing foaming. The constituents in the foam may be removed by vacuum.
Unless such recovery is intended, foaming is discouraged.

A diaphragm pump at a constant velocity that can be controlled by the operator feeds the reactor
cell. The operating air pressure supplied to the pump and the needle valve setting determines the
pumping rate. CAUTION: The pump pressure should never be set above the level
recommended by the manufacturer. If sufficient volume is not generated at this pressure, then
the pump or the cell needs service.

The cell is connected to the pump by pipes and valves that allow flow in either direction through
the cell, sampling, draining, and air blowdown. The normal flow of fluid in the cell is from
bottom to top. Flow may be reversed for short periods, if necessary, to clear obstructions. An
upward flow allows all cell parts to remain wetted and prevents accumulation of gas in the cell.

The output from the cell may be returned to a tank for re-processing or sent on for separation of
coagulated solids. Processing the fluid through the cell several times until the desired treatment
level is achieved is preferred. The pH of the solution being treated will rise with each pass. If
the pH rises above ten before the waste reaches the desired treatment level, then pH adjustment
may be necessary. This should not occur unless the waste is extremely concentrated, usually
above 350 ppm. If the unit is used in the single pass mode, then excessive energy levels may be
necessary to ensure full treatment unless the concentration of the contaminants is very uniform.

Foam may be removed by vacuum or by agitation. If the unit produces a heavy, durable foam,
vacuuming may be necessary to prevent flotation of solids in the clarifier.

A-l


-------
Solids separation may be accomplished by the addition of a chemical flocculant and clarification,
or by filtration. Clarification is usually the most efficient means as only the settled solids, rather
than the entire waste stream, must be filtered. A good flocculant should be effective at a feed
ratio of less than 0.5 percent.

The flocculant is added to the treated stream immediately prior to the clarifier but far enough
upstream to allow thorough mixing. This system adds the flocculant either to the tank following
treatment or to the overflow of this tank, depending on the amount of foam generated. If
excessive foam is being produced, the floe is added to the tank discharge with aggressive tank
agitation to break the foam. If the waste will not form a heavy, sinking floe, then it may be
necessary to add 25 percent calcium chloride solution to the agitated tank at the rate of 0.1 - 0.5
percent.

The clarifier spreads the flow of the discharge over a large area, slowing its movement and
allowing solids to fall into a zone of stillness. Solids must be periodically removed from the
bottom of the clarifier to ensure the stillness zone depth is maintained.

The clarified stream overflows from the top of the clarifier for further use or discharge. The
outlet weir of the clarifier is adjustable to ensure an even flow across the entire width of the
clarifier.

The controls of the unit allow automatic operation at present levels. The system will
automatically shut down when the waste feed supply is exhausted, the destination tank is full, the
unit experiences either high or low fluid pressure at the cell, or the air supply is interrupted. It
will not re-start without operator input. The controller also operates the filter press, but each
cycle must be selected and initiated by the operator. The controller allows pressure setting
adjustments and manual initiation of any single function to aid in troubleshooting and testing.
Valve selections are manual.

OPERATION

This section contains general instructions on operation. It does not include step-by-step details
such as which valve or switch to operate. For more details, consult the specific section for that
item of equipment.

PRE-OPERATION CHECKS

A pre-operational check must be made each time the unit is turned on. Checks should include:

?? Fluid levels in all associated tanks to ensure waste supply and holding capacity are

available.

?? Solids level in clarifier.

A-2


-------
?? Flocculant pump hose condition and flocculant supply, if used.

?? Valve settings. At least one "F" and "T" valve must be open. Caution: Incorrect valve

settings may result in injury to the operator and damage to the pipes and seals.
?? Power settings on the rectifier. Caution: The rectifier should be set to the lowest
settings for startup to avoid danger from a short circuit. If the rectifier produces
excess amperage at the low settings, check for a short.

?? Air supply pressure. Caution: If the pump does not circulate fluid in the cell, a gas
buildup could occur.

STARTUP

Perform the pre-operation checks.

Turn on electrical main breakers and air supply valve.

Set the rectifier to a low setting.

Pull the emergency stop button to the outward position and turn the key to "ON" and select the
automatic mode (see Controller Operation section).

Check the cell "flow" pressure and compare it with the last pressure recorded in the operator's
log. An increase in pressure may mean an incorrect valve setting or constriction in the piping or
cell.

After the cell is full, check the rectifier output. Caution: If the rectifier shows unusual
amperage or voltage, refer to troubleshooting. A short in the system will show high
amperage at low voltage, while an open circuit will show the opposite. Gradually increase
the current until the expected treatment value is reached.

Flush the sample line until newly treated fluid reaches the end. Take a sampling and check for
treatment. In a batch mode with metals below 400 ppm, the contaminant level should be reduced
by on the first pass, and to zero after the third pass. Check for flotation. If significant foam
occurs, reduce the current. Caution: Foam must not be allowed to reach the clarifier outlet
wire, as it contains significant contaminants. If treatment does not occur, increase the current.
In a direct-discharging mode, treatment must be complete after the first pass. Reduce the current
to the minimum possible setting for the final pass to aid in flocculation.

Re-sample after any current adjustments are made. If problems occur which can not be correct
by current adjustment, see the troubleshooting section.

Once the desired settings are reached, let the system run until the supply is exhausted. Note: If
the treated waste is re-circulated from and back to the same vessel, then it may require
additional passes.

A-3


-------
Caution: Air agitation should not be used in a tank while it is being filled, as it could cause
foaming, which would interfere with level sensors.

DURING OPERATION

Check the treatment level each time a batch volume is run through the system. For example, a
10-gpm system processing a 1000-gal batch should be checked at least every 100 minutes.

Check the cell "flow" pressure and compare it with the startup pressure. If the pressure has
increased more than 25 percent, stop treatment and blow down the cell.

A system discharging to sewer should be checked at least every 30 minutes. Caution: When a
cell is fully depleted, treatment ends abruptly. If the cell is expected to reach the end of its
useful life during the run, then more frequent checks should be made. Check the ampere-
hours total in the operator's log to predict cell life.

If discharging to the clarifier, check the floe initially and each time treatment is checked. If the
floe is too small to separate or is non-existent, then recycle the fluid from the clarifier back
through the cell. Take a 250-mL sample from the sample port and stir in four drops of chemical
flocculant. If floe does not form here, then the solids will not floe in the clarifier. You may
speed flocculation by adding a small amount of calcium chloride solution to initiate the floe. See
the troubleshooting section for additional information.

If the sample of a fluid that will not produce floe is found to produce floe when more flocculant
is added, increase the flocculant feed rate. Caution: An excessive flocculant feed rate may
result in a sticky floe that generates gas and that bridges in the bottom of the clarifier.

Maintain at least the minimum level of the chemical flocculant in its supply tank. Record the
opening of each new container in the chemical usage section of the operator's log.

Periodically, visually check the solids level in the clarifier. Solids should be removed by
pumping to the filter press or draining to another reservoir. Caution: Do not allow solids to
build higher than four inches from the top of the clarifier plates, as this decreases the
volume of the stillness zone. If floe attempts to overflow the plates, remove it immediately.

Occasionally cycle the slide valve to a different position to draw solids from the full width of the
clarifier. Refer to the clarifier section to see the relative drain port positions.

Operate the filter press to remove solids as they are generated. The clear water from the filter
press may be sent to a supply reservoir or to drain in the direct discharge mode, or to a supply
tank in batch mode. If the filter press is full and the clarifier solids capacity is reached, then
either stop treatment until the clarifier is emptied and re-started, or remove the solids to some
other reservoir for later filtering.

A-4


-------
SHUTDOWN

Read and record the pressure near the end of the run in the operator's log.

When the supply of waste is exhausted or the destination tank is full, the unit will automatically
turn off.

Operate the filter press until the solids in the clarifier are lowered to an acceptable level,
preferably leaving enough solids to reach the bottom of the longest plates, then turn off the filter
press pump.

If the reactor will not be operated again the same day, it should be drained and blown down. Set
the valves to the "DRAIN" setting on the valve diagram. Once the cell is drained, set the valves
to the "BLOWDOWN" setting and apply regulated air pressure for 30 seconds. Caution: Any
fluid in the lines used for blowdown will reach a high velocity near the end of blowdown
and can cause splashing. Make sure that the fluid is directed downward into a reservoir.

After blowdown, return the valves to the normal treatment position to avoid error on re-start
EXCEPT that the feed supply valves to the waste pump should be left OFF.

Record the date, hourmeter hours, and ampere-hours in the operator's log. Note: The pressure,
ampere hours, and clock hours recorded in the log are used to predict cell life. Omitting
entries could result in unexpected cell failure.

Record any maintenance done, failures encountered, or other observations in the chronological
section of the operator's log.

Turn off the key switch and the air supply.

STORAGE

If the unit will not be operated for an extended period of time, it should be prepared as if for
storage.

Disconnect the waste feed pump from the supply line and cycle the pump until it is dry. Then
turn off the first valve(s) after the pump.

Drain first, and then blow down the cell toward the clarifier.

Blow down all lines in a direction away from the cell.

Back-flush the cell with fresh water. Add the water through the sample port and remove it by
way of the drain.

A-5


-------
Blow down the cell toward the drain.

Pump down the clarifier completely (through the filter press). Continue to cycle the filter press
pump until it is empty, and then turn off the first valve after the pump.

Blow down and empty the filter press. Caution: If the filter press is not full or nearly full, a
longer blowdown is required. Always be prepared to capture wet sludge when the press is
opened while less than full.

Leave the valves in the settings for "storage" on the valve chart.

WINTKRI/ATION

The system should be winterized any time it will be idle while being subjected to freezing
temperatures.

A-6


-------
APPENDIX B

Data Collection Forms for Kaselco and Ion Exchange

Polishing Systems


-------
Data Collection Form for Kaselco and
Ion Exchange Polishing Systems
General Test Data

Date: 	

ETV-MF Project Manager:
Gull Industries Operator:

Parameter

Reading

Observations/Comments

Polymer Tank Dimensions





IX Acid Tank Dimensions





DC Caustic Tank Dimensions





Sludge Generation Volume:





Electricity Cost:





Labor Cost:





Acid Cost:





Caustic Cost:





Steel Plate Cost:





Steel Plate Usage:





Notes:

B-l


-------
Data Collection Form for Kaselco System
Cycle Specific Data

Date: 	

ETV-MF Project Manager:
Gull Industries Operator:

Parameter/Time

Reading or Sample #

Observations/Comments

Batch /Pass





Kaselco Start Time:





Amp-hour reading A at start:





Amp-hour reading B at start:





Kaselco Stop Time:





Amp-hour reading A at stop:





Amp-hour reading B at stop:





Volume Treated (L):





Polymer Height:





Sample Point 1:





Sample Point 2:





Sample Point 3:





Sample Point 4:





Batch /Pass





Kaselco Start Time:





Amp-hour reading A at start:





Amp-hour reading B at start:





Kaselco Stop Time:





Amp-hour reading A at stop:





Amp-hour reading B at stop:





Volume Treated (L):





Polymer Height







Sample Point 1







Sample Point 2







Sample Point 3







Sample Point 4







Notes:

B-2


-------
Data Collection Form for Ion Exchange System
Cycle Specific Data

Date: 	

ETV-MF Project Manager:
Gull Industries Operator:

Regeneration

Parameter/Time

Reading or Sample #

Observations/Comments

Acid Tank Height at Start:





Caustic Tank Height at Start:





Ion Exchange Regen. Start Time:





Ion Exchange Regen Stop Time:





Acid Tank Height at Completion:





Caustic Tank Height at Completion:





Sample Point 7:





Volume of Regenerant:





System Operation

Parameter/Time

Reading or Sample #

Observations/Comments

Batch





Ion Exchange Start Time:





Ion Exchange Stop Time:





Sample Point 5:





Sample Point 6:





Notes:

B-3


-------
APPENDIX C

Test Plan Modification Request


-------
TEST PLAN MODIFICATION REQUEST

In the course of verification testing, it may become necessary to modify the test plan due to
unforeseen events. The purpose of this procedure is to provide a vehicle whereby the necessary
modifications are documented and approved.

The Test Plan Modification Request form is the document to be used for recording these
changes. The following paragraphs provide guidance for filling out the form to ensure a
complete record of the changes made to the original test plan.

The person requesting the change should record the date and project name in the form's heading.
Program management will provide the request number.

Under Original Test Plan Requirement, reference the appropriate sections of the original test
plan, and insert the proposed modifications in the section titled Proposed Modification. In the
Reason section, document why the modification is necessary; this is where the change is
justified. Under Impact, give the impact of not making the change, as well as the consequences
of making the proposed modification. Among other things, the impact should address any
changes to cost estimates and project schedules.

The requestor should then sign the form and obtain the signature of the project manager. The
form should then be transmitted to the CTC Program Manager, who will either approve the
modification or request clarification. Upon approval, the modification request will be assigned a
number, logged, and transmitted to the requestor for implementation.

C-l


-------
TEST PLAN MODIFICATION REQUEST

Date:	 Number:	 Project:

Original Test Plan Requirement:	

Proposed Modification:

Reason:

Impact:

Approvals:

Requestor:	

Project Manager:_
Program Manager:

C-2


-------
APPENDIX D

ETV-MF Operation Planning Checklist


-------
ETV-MF Operation Planning Checklist

The ETV-MF Project Manager prior to initiation of verification testing must complete this form.
If a "yes " is checkedfor any items below, an action must be specified to resolve the concern on
the Job Training Analysis Form.

Proj ect Name: Expected Start Date:
ETV-MF Proj ect Manager:		

Will the operation or activity involve the following: Yes No Initials & Date
	Completed

Equipment requiring specific, multiple steps for controlled shutdown? (e.g.
in case of emergency, does equipment require more than simply pressing a
"Stop" button to shut off power?) Special Procedures for emergency shut-
down must be documented in Test Plan.







Equipment requiring special fire prevention precautions? (e.g. Class D fire
extinguishers)







Modifications to or impairment of building fire alarms, smoke detectors,
sprinklers or other fire protection or suppression systems?







Equipment lockout/tagout or potential for dangerous energy release?
Lockout/tagout requirements must be documented in Test Plan.







Working in or near confined spaces (e.g., tanks, floor pits) or in cramped
quarters?







Personal protection from heat, cold, chemical splashes, abrasions, etc.? Use

Personal Protective Equipment Program specified in Test Plan.







Airborne dusts, mists, vapors and/or fumes? Air monitoring, respiratory
protection, and /or medical surveillance may be needed.







Noise levels greater than 80 decibels? Noise surveys are required.
Hearing protection and associated medical surveillance may be necessary.







X-rays or radiation sources? Notification to the state and exposure
monitoring may be necessary.







Welding, arc/torch cutting, or other operations that generate flames and/or
sparks outside of designated weld areas? Follow Hot Work Permit
Procedures identified in Test Plan.







The use of hazardous chemicals? Follow Hazard Communication
Program, MSDS Review for Products Containing Hazardous Chemicals.
Special training on handling hazardous chemicals and spill clean up may
be needed. Spill containment or local ventilation may be necessary.







Working at a height of six feet or greater?







D-l


-------
ETV-MF OPERATION PLANNING CHECKLIST

The ETV-MF Project Manager prior to initiation of verification testing must complete this form.
If a "yes " is checked for any items below, an action must be specified to resolve the concern on
the Job Training Analysis Form.

Project Name:

ETV-MF Project Manager:	

Will the operation or activity involve the following:	Yes No Initials & Date

Completed

Processing or recycling of hazardous wastes? Special permitting may be
required.







Generation or handling of waste?







Work to be conducted before 7:00 a.m., after 6:00 p.m. and/or on
weekends? Two people must always be in the work area together.







Contractors working in CTC facilities? Follow Hazard Communication
Program.







Potential discharge of wastewater pollutants?







EHS aspects/impacts and legal and other requirements identified?







Contaminants exhausted either to the environment or into buildings?

Special permitting or air pollution control devices may be necessary.







Any other hazards not identified above? (e.g. lasers, robots, syringes)

Please indicate with an attached list.







The undersigned responsible party certifies that all applicable concerns have been indicated in
the "yes" column, necessary procedures will be developed, and applicable personnel will receive
required training. As each concern is addressed, the ETV-MF Project Manager will initial and
date the "initials & date completed" column above.

ETV-MF Project Manager:	 	 	

(Name)	(Signature)	(Date)

D-2


-------
APPENDIX E

Job Training Analysis Form


-------
Job Training Analysis Form

ETV-MF Project Name:

Basic Job Step

Potential EHS Issues

Potential Quality
Issues

Training









































































































ETV-MF Project Manager:	

Name	Signature

Date

E-l


-------
APPENDIX F

ETV-MF Project Training Attendance Form


-------
ETV-MF Project Training Attendance Form

ETV-MF Project:

Date

Training

Completed

Employee Name

Last First

Training Topic

Test
Score
(If applic.)









































































































































































ETV-MF Project Manager:

F-l


-------