Situation Photo Log Wednesday, September 12, 2012 Kalamazoo River / Enbridge Spill Prepared by: Matthew Haak START-USEPA Situation Unit Leader ------- Wednesday, September 12, 2012 Photo Log 2. Talmadge Creek MPO.O sheen observed. ------- Wednesday, September 12, 2012 Photo Log 4. Ceresco Dam observed boat operations generating sheen. ------- Wednesday, September 12, 2012 Photo Log 5. MP4.5 LDB observed sheen. 6. MPS.3 LDB observed sheen just down from the former C0.5 boat launch. ------- Wednesday, September 12, 2012 Photo Log 8. Ceresco Dam observed bathymetry crews operating. ------- Wednesday, September 12, 2012 Photo Log 10. Ceresco Dam observed product collecting in the vegetation along the control point boom. ------- Wednesday, September 12, 2012 Photo Log 11. MP10.4 & MP10.5 proposed sediment trap locations. 12. MP10.75 observed crews performing sediment trap monitoring. ------- Wednesday, September 12, 2012 Photo Log 13. MP12.25 off Raymond Rd., observed crew installing core log sediment trap structures. 14. MP12.25 off Raymond Rd., observed crew installing core log sediment trap structures. ------- Wednesday, September 12, 2012 Photo Log 15. MP15.5 South Mill Pond no sheen observed. 16. MP26.0 RDB sediment trap location observed a crew operating. ------- Wednesday, September 12, 2012 Photo Log 18. MP30.1, observed sediment trap survey crew. ------- Wednesday, September 12, 2012 Photo Log 20. MPS30.A observed the sediment trap installed. ------- Wednesday, September 12, 2012 Photo Log 22. Morrow Lake Delta observed a crew performing boom and curtain inspections. ------- Wednesday, September 12, 2012 Photo Log 24. Morrow Lake north cove observed the sweep boat operating. ------- Wednesday, September 12, 2012 Photo Log 26. Morrow Lake Delta. ------- |