Situation Photo Log

Wednesday, September 12, 2012
Kalamazoo River / Enbridge Spill

Prepared by:

Matthew Haak
START-USEPA
Situation Unit Leader


-------
Wednesday, September 12, 2012 Photo Log

2. Talmadge Creek MPO.O sheen observed.


-------
Wednesday, September 12, 2012 Photo Log

4. Ceresco Dam observed boat operations generating sheen.


-------
Wednesday, September 12, 2012 Photo Log

5. MP4.5 LDB observed sheen.

6. MPS.3 LDB observed sheen just down from the former C0.5 boat launch.


-------
Wednesday, September 12, 2012 Photo Log

8. Ceresco Dam observed bathymetry crews operating.


-------
Wednesday, September 12, 2012 Photo Log

10. Ceresco Dam observed product collecting in the vegetation along the

control point boom.


-------
Wednesday, September 12, 2012 Photo Log

11. MP10.4 & MP10.5 proposed sediment trap locations.

12. MP10.75 observed crews performing sediment trap monitoring.


-------
Wednesday, September 12, 2012 Photo Log

13. MP12.25 off Raymond Rd., observed crew installing core log sediment

trap structures.

14. MP12.25 off Raymond Rd., observed crew installing core log sediment

trap structures.


-------
Wednesday, September 12, 2012 Photo Log

15. MP15.5 South Mill Pond no sheen observed.

16. MP26.0 RDB sediment trap location observed a crew operating.


-------
Wednesday, September 12, 2012 Photo Log

18. MP30.1, observed sediment trap survey crew.


-------
Wednesday, September 12, 2012 Photo Log

20. MPS30.A observed the sediment trap installed.


-------
Wednesday, September 12, 2012 Photo Log

22. Morrow Lake Delta observed a crew performing boom and curtain

inspections.


-------
Wednesday, September 12, 2012 Photo Log

24. Morrow Lake north cove observed the sweep boat operating.


-------
Wednesday, September 12, 2012 Photo Log

26. Morrow Lake Delta.


-------