Situation Photo Log Monday, September 10, 2012 Kalamazoo River / Enbridge Spill Prepared by: Matthew Haak START-USEPA Situation Unit Leader ------- Monday, September 10, 2012 Photo Log 2. Sheen and tar globules observed at the downstream Ceresco portage. ------- Monday, September 10, 2012 Photo Log 4. MPS.63 LDB below the rail road trestles. ------- Monday, September 10, 2012 Photo Log 6. Ceresco bathymetry team observed operating. ------- Monday, September 10, 2012 Photo Log 8. C3.2 boat launch observed the boom utilized at Raymond Road being demobilized and staged. ------- Monday, September 10, 2012 Photo Log 10. MP10.75 sediment trap no sheen observed. ------- Monday, September 10, 2012 Photo Log 12. MP15.65 LDB tar glob and sheen observed. ------- Monday, September 10, 2012 Photo Log 14. MP14.70 LDB sediment curtain observed, SWAT was notified. ------- Monday, September 10, 2012 Photo Log 16. Observed a crew performing curtain inspections along Boom E of the Morrow Lake Delta, ------- Monday, September 10, 2012 Photo Log 17. Morrow Lake Delta observed one of two poling teams. 18. Morrow Lake Delta observed second of two poling teams. ------- Monday, September 10, 2012 Photo Log 20. Morrow Lake Delta sheen near Boom A sheen generated by the boat. ------- Monday, September 10, 2012 Photo Log 22. Morrow Lake southern cover observed sheen and tar globs. ------- Monday, September 10, 2012 Photo Log 23. Morrow Lake southern cover observed 4' ribbon of sheen. 24. Morrow Lake north cove sheen observed. ------- |