This Fact Sheet will tell you about.

Current Removal Activities

•	Background Information

•	Where to get more information

Current Removal Activities

In accordance with an Environmental Protection
Agency (EPA)-approved work plan, a remediation
contractor hired by the Potentially Responsible Par-
ties (known as the "PRP Group") has completed the
removal and off-site disposal of accumulated contam-
inated liquids, sludge and PVC piping from the "bio-
reactor", which is an aboveground concrete structure
located on the U.S. Oil Recovery (USOR) property.
Following removal of this material, the bioreactor
walls were demolished and the concrete demolition
debris was removed from the site. These activities
resulted in the removal of approximately 500 tons of
sludge, 500,000 gallons of liquid, 100 cubic yards of
PVC piping, and 700 cubic yards of concrete. The
PRP Group is currently making plans to remove and
dispose of approximately 1,000 drums and totes
stored on site since prior to mid 2010.

The PRP Group will continue on-going stabilization
efforts under EPA oversight as needed to protect the
public and Vince Bayou. Additional removal actions
are anticipated to be performed in 2014, or as site
conditions warrant action.

Background Information

The US Oil Recovery (USOR) Site comprises of two
separate properties which are located in Pasadena,
Texas, north of Highway 225 (the Site). US Oil Re-
covery operations at the 400 N. Richey Street property
received municipal and industrial Class I and Class II
wastewater, characteristically hazardous waste, used
oil and oily sludges, and municipal solid waste. Its
affiliate MCC Recycling (MCC) conducted operations
at the 200 N. Richey Street property which was a for-
mer sewage treatment plant, owned by the City of
Pasadena from approximately 1945 until it was ac-
quired by USOR in January 2009.

In an initial response action, EPA took steps to con-
tain off-site migration, mitigate the threat to the
public and to Vince Bayou, and stabilize the Site in
July 2010, November 2010, and January 2011. As
part of those efforts, approximately 833,500 gallons
of non-hazardous contaminated storm water were
transported off-site. Hazardous and non-hazardous
sludges open to the elements and contaminating
storm water were removed and also disposed of off-
site.

Pursuant to an Administrative Order on Consent,
dated August 25, 2011, EPA has continued to pro-
tect the public health, welfare, and the environment,
including Vince Bayou, by overseeing subsequent
Site stabilization activities performed by the PRP
Group. The PRP Group stabilization activities have
included Site security and video monitoring, regular
inspections of the Site, pump down/removal of liq-
uids as necessary to prevent releases from any con-
tainment areas, and removal/disposal of sludges and
liquids from 185 of the 225 roll-off containers that
are on site. As part of those efforts, approximately
900,000 gallons of liquid and 1,700 tons of sludge
have been removed and transported off-site. The
PRP Group obtained a Court appointed Receiver
with legal custody and control over the Site. The
Receiver's role is to assist the Group in its perfor-
mance of the EPA-required actions at the Site.

Where to get more information...

http ://epaosc. org/USOR-PRP

http://www.epa.gov/region6/6sf/pdffiles/usor-tx.pdf

Adam Adams
On-Scene Coordinator
U.S. EPA Region 6

Tel: 214.665.2779 or
1.800.533.3508 (toll free)
adams.adam@epa.gov

Raji Josiam

Remedial Project Manager
U.S. EPA Region 6

Tel: 214.665.8529 or 1.800.533.3508 (toll free)
iosiam.raii@epa.gov


-------
Stephen Harper

Community Involvement Coordinator/SEE
U.S. EPA Region 6

Tel: 214.665.2727 or 1.800.533.3508 (toll free)
harper. stephen@epa. gov

Lam Tran

Superfund Remediation Division

Texas Commission on Environmental Quality

Tel: 713.767.3559
1 am. tran@tceq. state. tx. us

Information Repository

Pasadena Public Library

1201 Jeff Ginn Memorial Drive

Pasadena, TX 77506

Thomas Simiele, Library Director

Tel: 713.475.4852

For press inquiries, please call the EPA Press Office
at 214.665.2200.

You can find more information about the Region 6
Superfund program on EPA's Region 6 website:

http://www.epa.gov/region6/6sf/6sf.htm.

2


-------
oEPA

United States
Environmental Protection
Agency

Actualizacion sobre las Actividades de
Remocion del Sitio	

Sitio Superfund U.S. Oil Recovery

Pasadena, Harris County, Texas	Abril 2014

Esta hoja de datos le brinda informacion
sobre...

Actividades de Remocion Actuales
Antecedentes
• Donde obtener mas informacion

Actividades de Remocion Actuales

Siguiendo el plan de trabajo aprobado por la Agencia
de Protection Ambiental (EPA por sus siglas en
ingles), las Partes Potencialmente Responsables (co-
nocidas como el "Grupo PRP") contrataron a un con-
tratista de remediation para llevar a cabo la remocion
y disposition fuera del sitio de liquidos y lodos con-
taminados acumulados provenientes de un "birreac-
tor", que es una estructura sobre la superficie
localizada dentro de la propiedad de U.S. Oil Recove-
ry (USOR por sus siglas en ingles). El Grupo PRP
removio y dispuso de manera adecuada los liquidos y
lodos de 185 de los 225 contenedores de carga y des-
carga que se encontraban en el sitio. Esto consistio en
la remocion de aproximadamente 1,400 toneladas de
solidos, 66,431 galones de liquidos, y 9,364 galones
de agua de lavado. El Grupo PRP empezo la remo-
cion de los lodos del "biorreactor" en diciembre de
2013 y tiene planificado remover y disponer aproxi-
madamente 1,000 contenedores y bolsos de carga que
se almacenaron en el sitio desde antes de mediados de
2010.

El Grupo PRP continuara con los esfuerzos de estabi-
lizacion en marcha bajo la fiscalizacion de EPA que
sea necesaria para proteger al publico Vince Bayou.
Se espera que acciones de remocion adicionales se
lleven a cabo en 2014, o a medida que las condiciones
del Sitio lo ameriten.

Antecedentes

El Sitio USOR consiste de dos propiedades inde-
pendientes las cuales se encuentran en Pasadena,
Texas al norte de la carretera 225 (el Sitio). Las ope-
raciones del USOR de la propiedad ubicada en el
400 N. Richey recibio la Categoria I y II para tratar

agua usadas municipales e industriales, desperdicios
peligrosos caracteristicos, aceite usados y lodos
aceitosos, y desperdicios municipales solidos. Sus
afiliados MCC Recycling (MCC, por sus siglas en
ingles) llevo a cabo operaciones en la propiedad en
el 200 N. Richey la cual era una antigua planta de
tratamiento de desperdicios que pertenecio a la Ciu-
dad de Pasadena desde aproximadamente 1945 hasta
cuando fue adquirida por USOR en enero de 2009.

En una action de respuesta inicial, EPA tomo algu-
nos pasos para contener la migration fuera del sitio,
mitigar la amenaza al publico y a Vince Bayou, y
estabilizar el Sitio en julio de 2010, noviembre de
2010, y enero de 2011. Como parte de estos esfuer-
zos, aproximadamente 833,500 galones de agua de
lluvia contaminada pero no peligrosa fue transporta-
da fuera del Sitio. Lodos peligrosos y no peligrosos
que estuvieron al descubierto contaminando el agua
de lluvia tambien fueron dispuestos fuera del Sitio.

Conforme con la Orden de Consentimiento Admi-
nistrativa, con fecha 25 de Agosto de 2011, EPA ha
seguido protegiendo la salud y bienestar del publico,
y el ambiente, incluyendo Vince Bayou, al fiscalizar
las actividades de estabilizacion del Sitio subsecuen-
tes que el Grupo PRP ha llevado a cabo. Las activi-
dades de estabilizacion del Grupo PRP incluyeron la
seguridad del Sitio, monitoreo con video, inspeccio-
nes regulares del Sitio, y bombeo/remocion de
liquidos como sea necesario, para prevenir ocurran
escapes desde las areas de contention. Como parte
de estos esfuerzos, aproximadamente 422,054 galo-
nes de liquido del "biorreactor" y aproximadamente
536,526 galones de liquido de las areas norte y sur
de deposito de tanques, y los sumideros han sido
removidos y transportados fuera del Sitio. El Grupo
PRP obtuvo un Receptor nombrado por la Corte con
custodia legal y control sobre el Sitio. La funcion
del Receptor es asistir al Grupo en el rendimiento de
las acciones que EPA requiere se lleven a cabo en el
Sitio.


-------
Donde obtener mas informacion...

http://epaosc.org/USOR-PRP

http://www.epa.gov/region6/6sf/pdffiles/usor-tx.pdf

Adam Adams
Coordinador del Sitio
U.S. EPA Region 6

Tel: 214.665.2779 o
1.800.533.3508 (llamada gratis)
adams.adam@epa.gov

Raji Josiam
Gerente del Proyecto de Remediacion
U.S. EPA Region 6

Tel: 214.665.8529 o 1.800.533.3508 (llamada gratis)
iosiam.raii@epa.gov

Stephen Harper

Coordinador de Participation Comunitaria/SEE
U.S. EPA Region 6

Tel: 214.665.2727 61.800.533.3508 (llamada gratis)
harper. stephen@epa. gov

Lam Tran

Division de Remediacion de Superfund
Comision de Calidad Ambiental de Texas

Tel: 713.767.3559
lam.tran@tceq. state, tx.us

Repositorio de Informacion

Biblioteca Publica de Pasadena
1201 Jeff Ginn Memorial Drive
Pasadena, TX 77506

Thomas Simiele, Director de la Biblioteca
Tel: 713.475.4852

Preguntas de la Prensa, por favor llame al Oficial de
Prensa de EPA al 214.665.2200.

Usted puede obtener mas informacion sobre el pro-
grama Superfund en la pagina de internet de EPA
Region 6:

http://www.epa.gov/region6/6sf/6sf.htm.