Situation Photo Log

Friday, September 7, 2012
Kalamazoo River / Enbridge Spill

Prepared by:

Larry Rader
START-USEPA
Situation Unit Leader


-------
Friday, September 7, 2012 Photo Log

2.

Sheen and tar globules observed near MP 5.5 LDB above Ceresco Dam.


-------
Friday, September 7, 2012 Photo Log

4. Sheen and tar globules observed along MP 5.75 LDB above Ceresco Dam.


-------
Friday, September 7, 2012 Photo Log

5. Sheen and tar globules observed along containment boom above Ceresco

Dam.







6. Sheen and tar globules observed along RDB within containment above

Ceresco Dam.


-------
Friday, September 7, 2012 Photo Log

7. Sheen observed behind sediment trap at MP 10.75 LDB

8. Crew removing containment boom along shoreline at MP 10.75 sediment

trap.


-------
Friday, September 7, 2012 Photo Log

10. Sheen and petroleum odor observed at MP 33.1 RDB,


-------
Friday, September 7, 2012 Photo Log

12. Crews inspecting boom configuration C in Morrow Lake Delta,


-------
Friday, September 7, 2012 Photo Log

13. Crews observed removing debris from containment configuration C in
southwest portion of Morrow Lake Delta.

14. Sheen sweeper pontoon boat operating in west central portion of lake.


-------
Friday, September 7, 2012 Photo Log

15. Sheen observed in northern cove of Morrow Lake. Sweeper boat was

notified.

16. South cove of Morrow Lake. Sheen observed and sweeper boat was en

route.


-------