Situation Photo Log Friday, September 7, 2012 Kalamazoo River / Enbridge Spill Prepared by: Larry Rader START-USEPA Situation Unit Leader ------- Friday, September 7, 2012 Photo Log 2. Sheen and tar globules observed near MP 5.5 LDB above Ceresco Dam. ------- Friday, September 7, 2012 Photo Log 4. Sheen and tar globules observed along MP 5.75 LDB above Ceresco Dam. ------- Friday, September 7, 2012 Photo Log 5. Sheen and tar globules observed along containment boom above Ceresco Dam. 6. Sheen and tar globules observed along RDB within containment above Ceresco Dam. ------- Friday, September 7, 2012 Photo Log 7. Sheen observed behind sediment trap at MP 10.75 LDB 8. Crew removing containment boom along shoreline at MP 10.75 sediment trap. ------- Friday, September 7, 2012 Photo Log 10. Sheen and petroleum odor observed at MP 33.1 RDB, ------- Friday, September 7, 2012 Photo Log 12. Crews inspecting boom configuration C in Morrow Lake Delta, ------- Friday, September 7, 2012 Photo Log 13. Crews observed removing debris from containment configuration C in southwest portion of Morrow Lake Delta. 14. Sheen sweeper pontoon boat operating in west central portion of lake. ------- Friday, September 7, 2012 Photo Log 15. Sheen observed in northern cove of Morrow Lake. Sweeper boat was notified. 16. South cove of Morrow Lake. Sheen observed and sweeper boat was en route. ------- |