Community Update #29
Pompton Lakes Study Area
Pompton Lakes, New Jersey

Upland Soil Areas Excavation/Dredging

Community Update

December 2016

EPA CLEANUP ACTIVITIES

Basic Site Information

The Upland Soil Areas excavation is

complete with the exception of one
small area (Area Al) totaling ap-
proximately 20 cubic yards (CY).
Mechanical dredging of approxi-
mately 19,300 CY of impacted sedi-
ment (containing mercury/lead/other
metals) in Area A and the Island
Area is in progress.

Boroiiph of Pompton Lakes

http://www.pomptonlakesgov.com

Questions? Please Contact:

EPA Remedial Project Manager

Perry Katz

(212)637-4426

katz.ira-perry@epa.gov

EPA Community Involvement
Coordinator

Pat Seppi

(646)369-0068

seppi.pat@epa.gov

This is EPA's 29th update to inform the community of the progress
of activities related to the portion of the Pompton Lakes Study Area
known as the Upland Soil Areas and the 3 acres of the lake
(designated Area A and the Island Area) that will be mechanically
dredged. Work is being performed by Sevenson Environmental Ser-
vices, Inc., on behalf of The Chemours Company FC, LLC
(Chemours) with EPA/NJDEP oversight.

ACTIVITIES—WEEK OF DECEMBER 12th

~	Transported/disposed of a total of 1,909 loads of impacted mate-
rial (excavated soil/dredged sediment) a/o December 15th

~	Completed dredging of Area A

~	Initiated excavation of soil at Uplands Soil Area Al

~	Processed/staged impacted sediment for off-site disposal

~	Conducted water treatment activities - effluent tank discharge
events occurred based on sample results meeting discharge crite-
ria in NJDEP permit

~	Continued perimeter monitoring—data on website: http://
www.pomptonlakesworks.com/pompton-lake-project/
environmental-monitoring/

~	No exceedances of dust/ mercury vapor/turbidity action levels
during monitoring associated with site activities

UPCOMING ACTIVITIES—WEEK OF DECEMBER 19th

~	Complete excavation of soil in Upland Soil Area Al

~	Complete soil excavation at Area Al, the remaining Uplands
Soil Area to be addressed—being completed at this time due to
need to address large trees/outfall pipe that require removal

~	Continue processing/load-out/disposal of impacted sediment

~	Continue water treatment activities

~	Continued perimeter monitoring—data on website: http://
www.pomptonlakesworks.com/pompton-lake-project/
environmental-monitoring/

NOTE:

~	No work will be conducted between December 22nd and Janu-
ary 2nd in observance of the holiday season. Work will resume
on January 3rd. EPA will transmit another update on December
23rd describing the remaining activities to be completed by mid-
January and maintenance of the project site during the winter.