United States Environmental Protection Agency
General Permit for New or Modified Minor Sources of Air
Pollution in Indian Country

http://www.epa.gov/air/tribal/tribalnsr.html

General Air Quality Permit for New or Modified Minor Source Stone Quarrying,
Crushing, and Screening Facilities in Indian Country

Last Modified: April 6, 2015

Information about this General Permit:

Applicability

Pursuant to the provisions of the Clean Air Act (CAA), Subchapter I, part D and 40 CFR part 49, subpart C, this
permit authorizes the construction or modification and the operation of each stationary and portable stone
quarrying, rock crushing, and screening plant for which a reviewing authority issues an Approval of the Request
for Coverage (permitted source).

Eligibility

To be eligible for coverage under this General Permit, the permitted source must qualify as a minor source as
defined in 40 CFR 49.152.

Request for Coverage

Requirements for submitting a Request for Coverage are contained in Section 7 of this General Permit.
Incorporation of Documents

The information contained in each reviewing authority's Approval of the Request of Coverage is hereby
incorporated into this General Permit.

Termination

Section 6 of this General Permit addresses a reviewing authority's ability to revise, revoke and reissue, or
terminate this General Permit. It also addresses the reviewing authority's ability to terminate an individual
permitted source's Approval of the Request for Coverage under this General Permit.

Definitions

The terms used herein shall have the meaning as defined in 40 CFR 49.152, unless otherwise defined in
Attachment B of this permit. If a term is not defined, it shall be interpreted in accordance with normal business
use.

*' n \


-------
Permit Terms and Conditions

The following applies to each permittee and permitted source with respect to only the affected emissions units
and any associated air pollution control technologies in that permitted source's Approval of the Request for
Coverage.

Section 1: General Provisions

1.	Construction and Operation

The permittee shall construct or modify and shall operate the affected emissions units and any associated
air pollution control technologies in compliance with this permit and all other applicable federal air quality
regulations; and in a manner consistent with representations made by the permittee in the Request for
Coverage, to the extent the reviewing authority relies upon these representations in issuing the Approval of
the Request for Coverage.

2.	Locations

This permit only authorizes the permittee to construct or modify and to operate the permitted source in the
location(s) listed in the reviewing authority's Approval of the Request for Coverage for that permitted
source.

3.	Liability

This permit does not release the permittee from any liability for compliance with other applicable federal
and tribal environmental laws and regulations, including the CAA.

4.	Severability

The provisions of this permit are severable. If any portion of this permit is held invalid, the remaining
terms and conditions of this permit shall remain valid and in force.

5.	Compliance

The permittee must comply with all provisions of this permit, including those set forth in the attachments
and emission limitations that apply to the affected emissions units at the permitted source. Noncompliance
with any permit provision is a violation of the permit and may constitute a violation of the CAA; is grounds
for an enforcement action; and is grounds for the reviewing authority to revoke the Approval of the Request
for Coverage and terminate the permitted source's coverage under this General Permit.

6.	National Ambient Air Quality Standards (NAAQS)/Prevention of Significant Deterioration (PSD) Protection
The permitted source must not cause or contribute to a NAAQS violation or, in an attainment area, must not
cause or contribute to a PSD increment violation.

7.	Unavailable Defense

It is not a defense for the permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the provisions of this permit.

8.	Property Rights

This permit does not convey any property rights of any sort or any exclusive privilege.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 2 of 16


-------
9.	Information Requests

You, as the permittee, shall furnish to the reviewing authority, within 30 days unless another timeframe is
specified by the EPA, any information that the reviewing authority may request in writing to determine
whether cause exists for revising, revoking and reissuing, or terminating coverage under the permit or to
determine compliance with the permit. For any such information claimed to be confidential, the permittee
must submit a claim of confidentiality in accordance with 40 CFR part 2 subpart B.

10.	Inspection and Entry

Upon presentation of proper credentials, the permittee must allow a representative of the reviewing
authority to:

a.	Enter upon the premises where a permitted source is located or emissions-related activity is conducted
or where records are required to be kept under the conditions of the permit;

b.	Have access to and copy, at reasonable times, any records that are required to be kept under the
conditions of the permit;

c.	Inspect, during normal business hours or while the permitted source is in operation, any facilities,
equipment (including monitoring and air pollution control equipment), practices or operations regulated
or required under the permit;

d.	Sample or monitor, at reasonable times, substances or parameters for the purpose of assuring
compliance with the permit or other applicable requirements and

e.	Record any inspection by use of written, electronic, magnetic and photographic media.

11.	Posting of Coverage

The most current Approval of the Request for Coverage for the permitted source, must be posted
prominently at the facility, and each affected emissions unit and any associated air pollution control
technology must be labeled with the identification number listed in the Approval of the Request for
Coverage for that permitted source.

12.	Duty to Obtain Source-specific Permit

If the reviewing authority intends to terminate a permitted source's coverage under this General Permit for
cause as provided in Section 6 of this General Permit, then the permittee shall apply for and obtain a source-
specific permit as required by the reviewing authority.

13.	Credible Evidence

For the purpose of establishing whether the permittee violated or is in violation of any requirement of this
permit, nothing shall preclude the use, including the exclusive use, of any credible evidence or information
relevant to whether a permitted source would have been in compliance with applicable requirements if the
permittee had performed the appropriate performance or compliance test or procedure.

Section 2: Emission Limitations and Standards

14.	The permittee shall install, maintain, and operate each affected emissions unit, including any associated air
pollution control equipment, in a manner consistent with good air pollution control practices for minimizing
emissions of New Source Review regulated pollutants and considering the manufacturer's recommended
operating procedures at all times, including periods of startup, shutdown, maintenance and malfunction.
The reviewing authority will determine whether the permittee is using acceptable operating and
maintenance procedures based on information available to the reviewing authority which may include, but

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 3 of 16


-------
is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures,
and inspection of the permitted source.

15.	Except as specified in Condition 16, maximum raw material throughput shall not exceed 1,100,000 tons-per-
month based on a 12-month rolling average.

16.	The following throughput limit applies when sources are co-located with hot mix asphalt plants and have
elected to comply with this limit: maximum raw material throughput shall not exceed 730,000 tons-per-
month based on a 12-month rolling average. The requirement to comply with this limit shall be specified in
the Approval of the Request for Coverage.

17.	Fuel combustion in stationary internal combustion engines shall be limited to diesel and biodiesel.

18.	Diesel and biodiesel shall contain no more than 0.0015 percent sulfur by weight.

19.	The combined fuel consumption in all engines and generators, excluding nonroad mobile engines, in any
calendar month shall not exceed:

a.	24,200 gallons if the permitted source is located in an ozone attainment, unclassifiable or
attainment/unclassifiable area or a marginal or moderate ozone nonattainment area; or

b.	12,000 gallons if the permitted source is located in a serious ozone nonattainment area;

c.	5,500 gallons if the permitted source is located in a severe ozone nonattainment area;

d.	1,900 gallons if the permitted source is located in an extreme ozone nonattainment area; or

e.	18,275 gallons if the Approval of Request for Coverage requires the permitted source to comply with
this condition, Condition 19.e. This fuel consumption limit includes any fuel use at a co-located Hot Mix
Asphalt operation.

20.	Emissions from all crushers, screens, drop points, and other possible release points shall be controlled by
wet suppression.

21.	Fugitive emissions from stone quarrying, rock crushing, and screening operations shall not exceed:

a.	12 percent opacity for crushers; and

b.	7 percent opacity, at other affected emissions units.

22.	Truck dumping of nonmetallic minerals into any screening operation, feed hopper, or crusher is exempt
from the emission limits in Condition 21.

23.	The permittee shall comply with the fugitive dust control plan in Attachment C.

24.	Each affected compression ignition engine, excluding nonroad mobile engines, shall comply with the
following limitations and standards:

a.	Each compression ignition engine that commenced construction on or after June 12, 2006 must be
certified to the applicable Tier standards in 40 CFR 89.112 and 40 CFR 1039.101 through 1039.104, for
all pollutants, for the same model year and maximum engine power.

b.	Each compression ignition engine that commenced construction before June 12, 2006 shall meet the
following standards based on the engine's maximum rated power.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 4 of 16


-------
Maximum
Engine Power
Rating

Emission Standard

<300 HP

(a) Change oil and filter every 1,000 hours of operation or annually, whichever
comes first; (b) Inspect air cleaner every 1,000 hours of operation or annually,
whichever comes first; (c) Inspect all hoses and belts every 500 hours of operation
or annually, whichever comes first, and replace as necessary.

300 < HP < 500

Limit carbon monoxide (CO) to 49 ppmvd @ 15% 02 OR reduce CO emissions by 70
percent or more. Emissions shall be controlled through the use of an oxidation
catalyst. Engines certified to Tier 3 standards in 40 CFR 89.112 are exempt from
this limit.

HP >500

Limit CO to 23 ppmvd @ 15% 02 OR reduce CO emissions by 70 percent or more.
Emissions shall be controlled through the use of an oxidation catalyst. Engines
rated at less than or equal to 560kW that are certified to Tier 3 standards in 40 CFR
89.112 are exempt from this limit. Engines rated at greater than 560kW that are
certified to Tier 2 standards in 40 CFR 89.122 are exempt from this limit.

25.	No affected compression ignition engine, excluding nonroad mobile engines, shall discharge into the
atmosphere any gases that exhibit 20 percent opacity or greater averaged over any six-consecutive-minute
period.

Section 3: Monitoring and Testing Requirements

26.	Wet Suppression Monitoring

At least once during each calendar month the permitted source operates, the permittee shall inspect to
check that water is flowing to discharge spray nozzles in the wet suppression system. The owner or operator
must initiate corrective action within 24 hours and complete corrective action as expediently as practical.

27.	Visible Emissions Survey

At least once during each calendar week in which the permitted source operates, the permittee shall
perform a visible emissions survey of all affected emissions units subject to the opacity limit in Condition 21.
The survey shall be performed during daylight hours by an individual trained in EPA Method 22 while the
permitted source is in operation. If visible emissions are detected during the survey, the permittee shall
either:

a.	Take corrective action so that within 24 hours no visible emissions are detected from any affected
emissions units while they are in operation; or

b.	Demonstrate compliance with the opacity limit at all affected emissions units that discharged visible
emissions during the survey using EPA Method 9 by an individual trained and certified in Method 9.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 5 of 16


-------
28.	Fugitive Emissions Survey

At least once during each calendar week in which the permitted source operates, the permittee shall survey
the facility for visible fugitive emissions. If fugitive emissions are detected crossing the property line, the
permittee shall take corrective actions according to the attached fugitive dust control plan (Attachment C).

29.	Initial Performance Test

Within 60 days after achieving the maximum production rate at which the permitted source will operate the
affected emissions unit(s), but not later than 180 days after the first day of operation after the reviewing
authority issues the Approval of the Request for Coverage, the permittee shall perform an initial
performance test to verify compliance with the applicable opacity limitations in Condition 21. Performance
tests shall be performed:

a.	According to a test plan approved by the reviewing authority;

b.	While the permitted source is operating under typical operating conditions;

c.	Using test Method 9 from 40 CFR part 60, appendix A with the following modifications:

i.	The observer shall stand at least 15 feet from the emissions source;

ii.	The observer shall, when possible, select a position that minimizes interference from other fugitive
emissions sources; and

iii.	Water used for wet suppression shall not be confused with particulate matter emissions and is not
to be considered a visible emission. When a water mist of this nature is present, the observation of
emissions is to be made at a point in the plume where the mist is no longer visible; and

d.	The duration of each Method 9 test shall be at least 30 minutes.

Compliance with each opacity limit shall be determined based on the average of at least five six-minute
averages.

30.	Additional Performance Test(s)

Ongoing performance tests meeting the criteria of the initial performance tests in Condition 29 shall be
performed whenever required by the reviewing authority but at least every five years.

31.	Performance Test for Engines

Within 60 days after achieving the maximum production rate at which the permitted source will operate,
but not later than 180 days after the first day of operation after the Approval of Request for Coverage is
issued by the reviewing authority the permittee shall perform a performance test to verify compliance with
the CO and emission limits in Condition 24, as applicable, as follows:

a.	According to a test plan approved by the reviewing authority;

b.	While the stone quarrying, crushing, and screening facility is operating under typical operating
conditions;

c.	Using test methods from 40 CFR part 60, appendix A, or portable analyzers allowed by 40 CFR part 63,
subpart ZZZZ, unless alternative methods are approved by the reviewing authority in writing in advance
of the test;

d.	While the catalyst inlet temperature and pressure drop are being monitored and recorded;

e.	Upon completion of the performance test, the permittee shall establish the operating range for the
catalyst inlet temperature based on a 4-hour average and the pressure drop across the catalyst; and

f.	The permittee shall conduct subsequent performance tests according to this paragraph whenever
required by the reviewing authority.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 6 of 16


-------
The permitted source may substitute the results of the most recent performance test performed on the
engine(s) in lieu of conducting the performance test for engines required above, provided that the most
recent performance test was conducted within two years of the first day of operation after the Approval of
Request for Coverage is issued by the reviewing authority, and, was conducted according to the
requirements in Conditions 31.a-f. above.

32.	Continuous Parameter Monitoring at Engines

For each engine greater than 500 hp subject to a CO emission limitation, the permittee shall install, operate,
and maintain a continuous parameter monitoring system according to the methods in 40 CFR 63.6625(b) to
continuously monitor catalyst inlet temperature. Catalyst temperature data shall be reduced to 4-hour
rolling averages. The permittee shall maintain the 4-hour rolling average catalyst inlet temperature within
the operating parameter established during the most recent performance test.

33.	Pressure Drop Monitoring at Engines

For each engine greater than 500 hp subject to a CO emission limitation, the permittee shall monitor the
pressure drop across the catalyst on a monthly basis. The permittee shall ensure the pressure drop across
the catalyst is within the operating parameter established during the most recent performance test.

Section 4: Recordkeeping Requirements

34.	The permittee shall maintain all records required to be kept by this permit for at least five years from the
date of origin, unless otherwise stated, either onsite or at a convenient location, such that they can be
delivered to the reviewing authority within 24 hours of a request.

35.	The permit application and all documentation supporting that application shall be maintained by the
permittee for the duration of time the affected emissions unit(s) is covered under this permit.

36.	Each month the permitted source shall record the amounts of crushed rock, stone, sand, and gravel
processed (in tons) and the 12-month rolling average.

37.	The types and quantities of fuel combusted in engines and generators shall be recorded each calendar
month.

38.	The dates and results of each wet suppression system monitoring performed pursuant to Condition 26, any
corrective action taken as a result of each survey, and the result of any corrective action taken shall be
recorded.

39.	The dates and results of each visible emissions survey performed pursuant to Condition 27 shall be
recorded. At a minimum, records shall include:

a.	The name of the person, company or entity conducting the survey;

b.	Whether visible emissions were detected from any affected emissions unit;

c.	Any corrective action taken;

d.	The result of any corrective action; and

e.	The results of any Method 9 tests performed.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 7 of 16


-------
40.	The dates and results of each fugitive emissions survey performed pursuant to Condition 28, any corrective
action taken as a result of each survey, and the result of any corrective action taken shall be recorded.

41.	The results of each performance test conducted pursuant to Condition 29, 30, or 31 shall be recorded. At a
minimum, the permittee shall maintain records of:

a.	The date of each test;

b.	Each test plan;

c.	Any documentation required to approve an alternate test method;

d.	Test conditions, including the amounts and types of products produced and the operating parameters of
any control equipment;

e.	The results of each test; and

f.	The name of the company or entity conducting the analysis.

42.	A log of all maintenance activities conducted on each engine, excluding nonroad mobile engines, shall be
recorded.

43.	The date, time, and duration of each deviation from the established catalyst operating parameters for each
engine, corrective actions taken to return the equipment to normal operation and the results of any
corrective action taken shall be recorded.

Section 5: Notification and Reporting Requirements

44.	Notification of Construction or Modification, and Operations

The permittee shall submit a written or electronic notice to the reviewing authority within 30 days from
when the permittee begins actual construction, and within 30 days from when the permittee begins initial
operations or resumes operation after a modification.

45.	Notification of Relocation

When a permittee intends to relocate the permitted source to an alternate location contained in the
Approval of the Request for Coverage, then the permittee must notify the reviewing authority electronically
within 30 days before or after such relocation. The notification must identify the owner, the preceding
location, and the new location of the permitted source.

46.	Notification of Change in Ownership or Operator

If the permitted source changes ownership or operator, then the new owner or operator must submit a
written or electronic notice to the reviewing authority within 90 days after the change in ownership or
operator is effective. In the report, the new permittee must provide the reviewing authority a written
agreement containing a specific date for transfer of ownership or operator, and an effective date on which
the new owner or operator assumes partial and/or full coverage and liability under this permit. The
submittal must identify the previous owner or operator, and update the name, street address, mailing
address, contact information, and any other information about the permitted source if it would change as a
result of the change of ownership or operator. The current owner or operator shall ensure that the
permitted source remains in compliance with the General Permit until any such transfer of ownership or
operator is effective.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 8 of 16


-------
47.	Notification of Closure

The permittee must submit a report of any permanent or indefinite closure to the reviewing authority in
writing within 90 days after the cessation of all operations at the permitted source. The notification must
identify the owner, the current location, and the last operating location of the permitted source. It is not
necessary to submit a report of closure for regular, seasonal closures.

48.	Annual Reports

The permittee shall submit an annual report on or before March 15 of each calendar year to the reviewing
authority. The annual report shall cover the period from January 1 to December 31 of the previous calendar
year and shall include:

a.	An evaluation of the permitted source's compliance status with the requirements in Section 2 for each
location in which the permitted source located during the calendar year;

b.	Summaries of the required monitoring and recordkeeping in Sections 3 and 4; and

c.	Summaries of deviation reports submitted pursuant to Condition 49.

49.	Deviation Reports

The permittee shall promptly report to the reviewing authority any deviations as defined at 40 CFR
71.6(a)(3)(iii)(C) from permit requirements including deviations attributable to upset conditions. Deviation
reports shall include:

a.	The identity of affected emissions unit where the deviation occurred.

b.	The nature of the deviation;

c.	The length of time of the deviation;

d.	The probable cause of the deviation; and

e.	Any corrective actions or preventive measures taken as a result of the deviation to minimize emissions
from the deviation and to prevent future deviations.

f.	For the purposes of this permit, promptly shall be defined to mean:

i.	Within 72 hours of discovery for deviations from any emission limit in Condition 20 and any opacity
limit in Condition 21; or

ii.	Within 30 days after the end of the month in which the permittee discovered the deviation, for all
other deviations.

50.	Performance Test Reports

The permittee shall submit a test report to the reviewing authority within 45 days after the completion of
any required performance test. At a minimum, the test report shall include:

a.	A description of the affected emissions unit and sampling location(s);

b.	The time and date of each test;

c.	A summary of test results, reported in units consistent with the applicable standard;

d.	A description of the test methods and quality assurance procedures used;

e.	A summary of any deviations from the proposed test plan and justification for why the deviation(s) was
necessary;

f.	The amount of fuel burned, raw material consumed, and product produced during each test run;

g.	Operating parameters of the affected emissions unit and control equipment during each test run;

h.	Sample calculations of equations used to determine test results in the appropriate units; and

i.	The name of the company or entity performing the analysis.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 9 of 16


-------
51.	Reporting and Notification Address

The permittee shall send all required reports to the reviewing authority at the mailing address(es) specified
in the Approval of the Request for Coverage.

52.	Signature Verifying Truth, Accuracy, and Completeness

All reports required by this permit shall be signed by a responsible official as to the truth, accuracy, and
completeness of the information. The report must state that, based on information and belief formed after
reasonable inquiry, the statements and information are true, accurate, and complete. If the permittee
discovers that any reports or notification submitted to the reviewing authority contain false, inaccurate, or
incomplete information, the permittee shall notify the reviewing authority immediately and correct or
amend the report as soon as practicable.

Section 6: Changes to this General Permit

53.	Revising, Reopening, Revoking and Reissuing, or Terminating for Cause

The permit may be revised, reopened, revoked and reissued, or terminated for cause. The filing of a request
by you, the permittee, for a permit revision, revocation and re-issuance, or termination, or of a notification
of planned changes or anticipated noncompliance does not stay any permit condition. This provision also
applies to the documents incorporated by reference.

54.	Terminating Coverage Under this Permit

The reviewing authority may terminate a previously issued Approval of the Request for Coverage, and
thereby terminate that permittee's authorization to construct or modify, and that permitted source's
authorization to operate under this General Permit for cause as defined in Attachment B. The reviewing
authority may provide the permittee with notice of the intent to terminate, and delay the effective date of
the termination to allow the permittee to obtain a source-specific permit as required by the reviewing
authority.

55.	Change in Ownership or Operator

If the permitted source changes ownership or operator, the reviewing authority may change the Approval of
the Request of Coverage to reflect the new ownership or operator in accordance with the administrative
amendment provisions in 40 CFR 49.159(f).

56.	Permit Becomes Invalid

Authority to construct and operate under this permit becomes invalid if the permittee does not commence
construction within 18 months after the effective date of the request for coverage under a general permit, if
the permittee discontinues construction for a period of 18 months or more, or if the permittee does not
complete construction within a reasonable time. The reviewing authority may extend the 18-month period
upon a satisfactory showing that an extension is justified, according to 40 CFR 49.156(e)(8).

Section 7: Obtaining Coverage under this General Permit

57.	To obtain coverage under this General Permit, an applicant must submit a Request for Coverage to the
appropriate reviewing authority for the area in which the permitted source is or will be located (the Request
for Coverage Form can be found at: http://www.epa.gov/air/tribal/tribalnsr.html). Attachment D contains a
list of reviewing authorities and their area of coverage.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 10 of 16


-------
58. If the plant will locate in area covered by more than one reviewing authority, the applicant need only submit
a Request for Coverage to one reviewing authority with regard to all intended locations of operation. The
Request for Coverage must contain the information requested in the standard application form for this
permit. You must also submit a copy of the Request for Coverage to the Indian governing body for every
area in which the permitted source plans operate.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 11 of 16


-------
Attachment A: Abbreviations and Acronyms

ASTM

American Society for Testing and Materials

CAA or the Act

Federal Clean Air Act

CFR

Code of Federal Regulations

CO

carbon monoxide

EPA

United States Environmental Protection Agency

gr/dscf

gram per dry standard cubic foot

Hg

mercury

hp

horsepower

kW

kilowatt

NAAQS

National Ambient Air Quality Standards

NSR

New Source Review

ppm

parts per million

ppmvd

parts per million by volume, dry basis

PSD

Prevention of Significant Deterioration

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 12 of 16


-------
Attachment B: Definitions

For the purposes of this General Permit:

Approval of the Request for Coverage means a reviewing authority's letter granting an applicant's request for
construction or modification, and operation of a minor source under the terms and conditions of this General
Permit.

Biodiesel means a combustion fuel made from fatty acids of methyl esters that complies with the specifications
of ASTM 6751

Cause means with respect to the reviewing authority's ability to terminate a permitted source's coverage under
a permit that:

1.	The permittee is not in compliance with the provisions of this General Permit;

2.	The reviewing authority determines that the emissions resulting from the construction or modification
of the permitted source significantly contribute to NAAQS violations, which are not adequately
addressed by the requirements in this General Permit;

3.	The reviewing authority has reasonable cause to believe that the permittee obtained Approval of the
Request for Coverage by fraud or misrepresentation; or

4.	The permittee failed to disclose a material fact required by the Request for Coverage or the regulations
applicable to the permitted source of which the applicant had or should have had knowledge at the time
the permittee submitted the Request for Coverage.

Construction means any physical change or change in the method of operation including fabrication, erection,
installation, demolition, or modification of an affected emissions unit that would result in a change of emissions.

Permittee means the owner or operator of a permitted source.

Permitted source means each stationary and portable stone quarrying, rock crushing and screening facility for
which a reviewing authority issues an Approval of the Request for Coverage.

Request for Coverage means a permit application that contains all the information required in the standard
application form.

Responsible official means one of the following:

1.	For a corporation: a president, secretary, treasurer, or vice-president of the corporation in charge of a
principal business function, or any other person who performs similar policy or decision-making
functions for the corporation, or a duly authorized representative of such person if the representative is
directly responsible for the overall operation of the permitted source.

2.	For a partnership or sole proprietorship: a general partner or the proprietor, respectively.

3.	For a public agency: Either a principal executive officer or ranking elected official, such as a chief
executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.

Standard cubic foot means a measure of the quantity of a gas equal to a cubic foot of volume at a temperature
of 68 °F and a pressure of 29.92 in. Hg.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 13 of 16


-------
Attachment C: Dust Control Plan

1.	Site Roadways and Plant Yard

a.	The dust on the site roadways/plant yard shall be controlled by applications of water, calcium chloride
or other acceptable fugitive dust control compound approved by the reviewing authority. Applications
of dust suppressants shall be done as often as necessary to meet all applicable emission limits.

b.	All paved roadways/plant yards shall be swept as needed between applications.

c.	Any material spillage on roads shall be cleaned up immediately.

2.	Plant

a.	The drop distance at each transfer point shall be reduced to the minimum the equipment can achieve.

b.	The transfer point from the re-circulating belt to the feed belt shall be equipped with an enclosed chute.

3.	Storage Piles

a.	Stockpiling of all nonmetallic minerals shall be performed to minimize drop distance and control
potential dust problems.

b.	Stockpiles shall be watered on an as needed basis in order to meet the opacity limits. Also, equipment to
apply water or dust suppressant shall be available at the site, or on call for use at the site, within a given
operating day.

4.	Truck Traffic

a.	Vehicles shall be loaded to prevent their contents from dropping, leaking, blowing or otherwise
escaping. This shall be accomplished by loading so that no part of the load shall come in contact within
six (6) inches of the top of any side board, side panel or tail gate; otherwise, the truck shall be tarped.

b.	A speed limit sign of 15 miles-per-hour or lower shall be posted on site so that it is visible to truck traffic.

5.	Corrective Actions

If corrective action needs to be taken, the permittee shall consider and use one or more of the following

options: adjust the watering and/or sweeping frequencies, reduce drop distances, increase cover, and/or

take other actions to reduce fugitive dust emissions.

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 14 of 16


-------
Attachment D - List of Reviewing Authorities and Areas of Coverage

EPA
Region

Address Tor Notit'iaition of
Coverage

Address for All Other
Notificationsmid Reports

Area Covered

Phone
Nu m her

Region 1

EPA New England
5 Post Office Square, Suite 100
Mail Code OEP05-2
Boston, MA 02109-3912

EPA New England
5 Post Office Square, Suite 100
Mail Code OES04-2
Boston, MA 02109-3912

Connecticut,
Maine,

Massachusetts,
New

Hampshire,
Rhode Island,
and Vermont

888- 372-7341
617-918-1111

Region II

Chief, Air Programs Branch

Clean Air and Sustainability

Division

EPA Region 2

290 Broadway, 25th Floor

New York, NY 10007-1866

Chief, Air Compliance Branch
Division of Enforcement and
Compliance Assistance
EPA Region 2
290 Broadway, 21st Floor
New York, NY 10007-1866

New Jersey,
New York,
Puerto Rico,
and Virgin
Islands

877-251-4575

Region III

Office of Permits and Air Toxics
3AP10

EPA Region 3
1650 Arch Street
Philadelphia, PA 19103

Office of Air Enforcement and
Compliance Assurance
3AP20

EPA Region 3
1650 Arch Street
Philadelphia, PA 19103

Delaware,
District of
Columbia,
Maryland,
Pennsylvania,
Virginia, and
West Virginia

800-438-2474
215-814-5000

Region IV

Chief, Air Permits Section
EPA Region 4 APTMD
61 Forsyth Street
Atlanta, GA 30303

Chief, Air & EPCRA Enforcement
Branch

EPA Region 4 APTMD
61 Forsyth Street, SW
Atlanta, GA 30303

Alabama,
Florida,
Georgia,
Kentucky,
Mississippi,
North Carolina,
South Carolina,
and Tennessee

800-241-1754
404-562-9000

Region V

Air Permits Section
Air Programs Branch (AR-18J)
EPA Region 5
77 West Jackson Blvd
Chicago, Illinois 60604

Air Enforcement and
Compliance Assurance Branch
(AE-17J)

Air and Radiation Division
EPA Region 5
77 West Jackson Blvd
Chicago, Illinois 60604

Illinois, Indiana,
Michigan,
Minnesota,
Ohio, and
Wisconsin

800-621-8431
312-353-2000

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 15 of 16


-------
EPA
Region

Address Tor Notification of
Coverage

Address for All Other
Notificationscilid Reports

Area Covered

Phone
Nil ill her

Region VI

Multimedia Planning and
Permitting Division
EPA Region 6

1445 Ross Avenue (6PD-R)
Dallas, TX 75202

Compliance and Enforcement
Correspondence:

Compliance Assurance and
Enforcement Division
EPA Region 6
1445 Ross Avenue (6EN)
Dallas, TX 75202

Arkansas,
Louisiana, New
Mexico,
Oklahoma, and
Texas

800-887-6063
214-665-2760

Region VII

Chief, Air Permitting &
Compliance Branch
EPA Region 7
11201 Renner Blvd
Lenexa, KS 66219

Chief, Air Permitting &
Compliance Branch
EPA Region 7
11201 Renner Blvd
Lenexa, KS 66219

Iowa, Kansas,
Missouri, and
Nebraska

800-223-0425
913-551-7003

Region VIII

U.S. Environmental Protection

Agency, Region 8

Office of Partnerships and

Regulatory Assistance

Tribal Air Permitting Program,

8P-AR

1595 Wynkoop Street
Denver, Colorado 80202

U.S. Environmental Protection
Agency, Region 8
Office of Enforcement,
Compliance & Environmental
Justice

Air Toxics and Technical
Enforcement Program, 8ENF-AT
1595 Wynkoop Street
Denver, Colorado 80202

Colorado,
Montana, North
Dakota, South
Dakota, Utah,
and Wyoming

800-227-8917
303-312-6312

Region IX

Chief, Permits Office (Air-3)

Air Division

EPA Region 9

75 Hawthorne St

San Francisco, CA 94105

Enforcement Division Director
Attn: Air & TRI Section (ENF-2-1)
EPA Region 9
75 Hawthorne St
San Francisco, CA 94105

American
Samoa, Arizona,
California,
Guam, Hawaii,
Navajo Nation
Nevada, and
Northern
Mariana Islands

866-EPA-9378
415-947-8000

Region X

Tribal Air Permits Coordinator
U.S. EPA, Region 10, AWT-150
1200 Sixth Avenue, Suite 900
Seattle, WA 98101

Tribal Air Permits Coordinator
U.S. EPA, Region 10, AWT-150
1200 Sixth Avenue, Suite 900
Seattle, WA 98101

Alaska, Idaho,
Oregon, and
Washington

800-424-4372
206-553-1200

General Permit for Stone Quarrying, Crushing, and Screening Facilities
Version 1.0

Page 16 of 16


-------