Olympic Region Clean Air Agency
Title V Program Review
(2nd Round)

EPA Region 10

Final September 29, 2020


-------
Table of Contents

I.	Introduction	3

ORCAA's Title V Program	3

Program Review Objective and Overview	3

Program Review Report Structure	5

II.	Follow-up to 2007 Program Review	5

Section A. Title V Permit Preparation and Content	6

Section C. Monitoring	8

Section D. Public Participation and Affected State Review	11

Section E. Permit Issuance / Revision / Renewal	11

Section G. Resources and Internal Management Support	12

III.	Additional Review	12

New Suggestions	13

New Concerns	14

IV.	Summary of Concerns	16

Attachments

1	Program Review Kickoff Letter and Information Request, April 29, 2020

2	Program Review Information Request Response, May 27, 2020

3	Title V Operating Permit System Reported Data Summary

ORCAA Title V Program Review - 2020

Page 2


-------
I. Introduction

This report documents the (2020) second review of the Olympic Region Clean Air Agency's
(ORCAA's) Title V permitting program. The first Title V program review for ORCAA was
completed in September 2007.

ORCAA's Title V Program

The Olympic Region Clean Air Agency is a local air pollution control agency with jurisdiction in
six counties in western Washington: Clallam, Grays Harbor, Jefferson, Mason, Pacific and
Thurston. ORCAA implements the State of Washington operating permit regulations found in
Washington Administrative Code 173-401, but has their own fee rules. The U.S. Environmental
Protection Agency, Region 101 granted ORCAA full approval of its title V program, effective
September 12, 2001. 66 FR 42439 (August 13, 2001). A revision to Washington's Title V rules
was approved, effective on January 2, 2003. 67 FR 71479 (Dec 2, 2003). We have not approved
any revisions to Washington's title V program since 2003. ORCAA has revised their fee rules
since 2003; these revisions did not require the EPA approval.

ORCAA currently issues Title V permits to approximately 11 sources. There are four permit
writers that are responsible for writing Title V permits as well as processing construction
permits, inspecting sources, reviewing source test reports, reviewing emission inventories and
other miscellaneous duties. Each permit writer is assigned specific sources for performing all of
these responsibilities. There are other staff that provide management, administrative,
enforcement, and accounting support to the Title V program.

Each permit is accompanied by a Statement of Basis that explains the technical and legal basis
for the permit. ORCAA calls the Statement of Basis the "Technical Support Document."

Program Review Objective and Overview

The EPA initiated Title V program reviews in response to recommendations in a 2002 Office of
Inspector General audit. The objective of broader program reviews (as opposed to individual
permit reviews) is to identify good practices that other agencies can learn from, document areas
needing improvement and learn how the EPA can help improve state and local Title V programs
and expedite permitting.

The EPA set an aggressive initial national goal of reviewing all state and local Title V programs
with 10 or more Title V sources. ORCAA was one of ten Title V programs in Region 10
reviewed between 2004 and 2007. Here is the list of agencies in Region 10 reviewed in the first
round along with the final report date and an approximate number of Title V sources they
regulated when reviewed:

Permitting Authority (first round)	Report Date	Sources

Idaho Department of Environmental Quality	January 2004	59

Oregon Department of Environmental Quality	June 2006	111

Lane Regional Air Protection Agency (OR)	June 2006	19

Spokane Regional Clean Air Agency (WA)	August 2006	10

Puget Sound Clean Air Agency (WA)	September 2006	35

1 In this report, the term "EPA" refers to the United States Environmental Protection Agency as a nationwide
agency. The term "Region 10" and the first-person plural (we/us/our) refer to the EPA, Region 10.

ORCAA Title V Program Review - 2020

Page 3


-------
Washington Department of Ecology	September 2006	27

Northwest Clean Air Agency (WA)	September 2006	21

Alaska Department of Environmental Conservation	September 2006	158

Olympic Regional Clean Air Agency (WA)	September 2007	15

Southwest Clean Air Agency (WA)	September 2007	12

In response to a follow-up review by the Office of Inspector General, the EPA also committed to
repeat the reviews of all Title V programs with 20 or more Title V sources every four years
beginning in 2007. The original, second-round commitment covered each of the four state
programs in Region 10 (Alaska, Idaho, Oregon and Washington) as well as two local agencies in
Washington (Puget Sound Clean Air Agency and Northwest Clean Air Agency). In September
2016, we fulfilled that commitment and decided to continue second-round reviews for the
remaining agencies that were reviewed in the first round, but not yet reviewed for a second time.

Below is the list of agencies reviewed to date in the second round along with the final report
date. All of the program review reports can be found on Region 10's air permitting website.2

Permitting Authority (second round)

Idaho Department of Environmental Quality
Puget Sound Clean Air Agency (WA)

Northwest Clean Air Agency (WA)

Washington Department of Ecology
Alaska Department of Environmental Conservation
Oregon Department of Environmental Quality
Lane Regional Air Protection Agency (OR)
Spokane Regional Clean Air Agency (WA)
Southwest Clean Air Agency (WA)

Report Date

September 2007
September 2008
September 2013
September 2014
September 2015
September 2016
September 2017
November 2018
November 2019

In the first title V program review, we covered all major elements of a title V program. In the
second round of program reviews, we focused on issues specific to each permitting authority's
implementation of its permitting program. Of particular interest is how each authority has
addressed the concerns identified in the first review. We also considered permit issuance
progress, resources, compliance assurance monitoring (CAM), which is required to be added
during permit renewal for most sources, and how programs have integrated new requirements
and rules into their permits and program.

To prepare for this review, Region 10 sent a letter in April 2020 requesting specific information
from ORCAA (Attachment 1). Region 10 reviewed ORCAA's emailed response (compiled as
Attachment 2) which included, as requested, a staff list, financial records, and an update
regarding each of the concerns raised in 2007.

Region 10 also reviewed past permit issuance data ORCAA reported to TOPS, the Title V
Operating Permits System (Attachment 3), and a selection of recently-issued permits. Permits
issued more recently were intentionally selected for review to provide a more accurate depiction
of how ORCAA's permits have changed since the first program review. The permits reviewed
include those listed in the table below, as well as 7 other permits for which only compliance

2 https://www.epa. gov/caa-permitting/permit-program-reviews-epa-region-10

ORCAA Title V Program Review - 2020

Page 4


-------
assurance monitoring implementation was reviewed - those 7 permits are generally discussed in
the follow-up section for Concern C-3.

Permit No.	Company Name & Location

16AOP1172	Simpson Door Company McCleary, WA

15AOP1129	Crown Cork & Seal Company Olympia, WA

12AOP915	Weyerhaeuser NR Company

Date Issued

07/20/2018
09/01/2016
11/20/2019

An online conference was conducted with ORCAA on July 15-16, 2020, Region 10 staff
interviewed permit writing staff, finance staff and the agency management. The purpose of the
interviews was to clarify and discuss what was learned from the review of their permits and other
information provided by ORCAA. Region 10 staff and ORCAA staff discussed permit issuance
progress, program resources (and the fee program), general program implementation topics, and
specific issues identified during the previous review of ORCAA's program including compliance
assurance monitoring.

[In the final report, discuss here when the draft report was shared with ORCAA and the follow
through that occurred thereafter building up to the issuance of the final report.]

Program Review Report Structure

This program review report is presented in four main sections:

I.	Introduction

II.	Follow-up to 2007 Program Review

III.	Additional Review

IV.	Summary of Concerns and Recommendations

Section I presents background information regarding ORCAA's Title V program as well as an
overview of Region 10's program review plan. Section II presents Region 10's evaluation of
ORCAA's progress in resolving concerns identified in the 2007 program review. Section III
presents additional observations from Region 10's review of ORCAA's individual permits and
other information provided. Finally, Section IV summarizes Region 10's second-round concerns
and presents Region 10's recommendations for resolving any outstanding issues.

II. Follow-up to 2007 Program Review

In the initial Title V program review, finalized in September 2007, Region 10 provided
observations delineated into nine separate topic areas labeled A through I. In each section,

Region 10 identified good practices, concerns and other observations and asked ORCAA to
respond to the concerns identified. In December 2007, ORCAA responded to Region 10
addressing the concerns identified by Region 10.

This section of the second-round program review report presents Region 10's evaluation of the
progress ORCAA has made in addressing the concerns identified in the initial program review.
Each of Region 10's original concerns is listed below, followed by ORCAA's 2007 responses,
ORCAA's 2020 update, and, finally, Region 10's second-round (Round 2) evaluation.

ORCAA Title V Program Review - 2020

Page 5


-------
Section A. Title V Permit Preparation and Content

A-l 2007 EPA Concern: In at least one permit, ORCAA has incorporated an NSPS
requirement by reference, citing only the subpart and listing none of the specific
requirements that apply to the source. To be an effective compliance tool, the permit
should be as clear as possible about the requirements that apply and add specific
monitoring that assures compliance. Simply referencing at the NSPS subpart level is not
an adequate level of detail for Title V. ORCAA should specifically list in each permit the
requirements from any NSPS that apply.

2007 ORCAA Response: High Level vs. Low Level Citing. ORCAA's understanding is
that both high level and low-level citing of an applicable regulation is available for Title
V permitting, provided that all applicable requirements are incorporated into a Title V
permit. ORCAA considers citing only the subpart and not specific subsections of an
applicable NSPS, NESHAP or MACT standard as the superior approach because the
subpart citation includes all applicable subsections, all applicable subsections outside of
the subpart that are referenced by the subpart (like subpart "A" requirements), and all
applicable appendices referenced by the subpart. If an agency's policy is to cite the
specific subsections of an applicable subpart, then all applicable subsections must be
specifically cited and any subsection not cited in the permit signifies it is not part of the
permit and, therefore, not applicable. Considering the complex nature of most federal
standards, applicability of many general requirements from the corresponding "Subpart
A" requirements, and applicability of provisions for testing contained in referenced
appendices, citing all applicable requirements at the subsection level of a subpart is not
practical and incurs a high risk of leaving an applicable requirement out. In addition,
citing only the subpart retains all compliance options that were built into the subpart and
intended to provide the affected facility flexibility. Most new MACT standards contain
multiple compliance options and/or requirements. ORCAA believes flexibility provisions
intended in new MACT standards should be retained in the Title V permit. If the policy is
to cite at specific subsections, then it becomes necessary to cite all compliance options in
order to retain the flexibility provisions built into a MACT. By far the easier, more
understandable and less complicated approach is to cite the subpart only. For these
reasons, ORCAA will continue with the current policy of high-level citing. Exactly how
an NSPS, NESHAP or MACT is incorporated into a permit will largely depend on the
complexity of the standard. In some cases it may be valuable to cite referenced subparts
or appendices. However, high level citing will be used to capture federal standards
completely and thoroughly.

Listing Applicable Requirements. The other concern mentioned is that one of the permits
reviewed did not specifically list the applicable requirements. ORCAA agrees that not
listing applicable emission limitations and operational requirements is a problem and that
the permit would be clearer if it listed the specific emission limitations in addition to
citing the applicable subpart. ORCAA will revise this permit and institute a policy to
specifically list emission limitations in Title V permit tables in addition to citing the
subpart.

2020 ORCAA Update: High Level vs. Low Level Citing of NSPS/NESHAP. ORCAA
reconsidered their previous plan of continuing with a policy of incorporating applicable

ORCAA Title V Program Review - 2020

Page 6


-------
NSPS, NESHAPS and MACT standards into permits using "high level" incorporation by
reference (see ORCAA responses 12/14/2007). Starting in 2011 with the permit renewal
for Nippon Paper Industries (now McKinley Paper), ORCAA switched to a policy of
incorporating specific requirements from applicable NSPS/NESHAP/MACT standards.
Permit renewals issued after this date should reflect detailed requirements from
applicable federal standards with the exception of Reference Test Methods, and QA/QC
standards and performance specifications for required monitors, which are still
incorporated into permits by reference. There remains one permit, the permit for Sierra
Pacific Cogeneration, that predates ORCAA's transition from a policy of incorporating
federal requirements by reference to incorporating specific requirements, which started in
2011. This permit is up for renewal and a draft permit is scheduled to be issued sometime
in June 2020.

Listing Applicable Requirements. The second concern raised was that one of the permits
reviewed in 2007 did not specifically list applicable requirements. ORCAA's current
policy is to incorporate specific limits and operating standards from applicable
requirements. All permits except the permit for Sierra Pacific Cogeneration were drafted
under ORCAA's current policy and should reflect specific limits, standards and other
requirements from applicable requirements.

Round 2 Evaluation: Though the Sierra Pacific Cogeneration permit has not been issued
at the time of this final report, Region 10 is satisfied with ORCAA's update and does not
consider this a concern that warrants follow-up.

A-2 2007 EPA Concern: In ORCAA's permits, the standard Terms and Conditions section
presents off permit change provisions but did not specify that off-permit changes require
notification to the agency. This should be added. ORCAA should also consider adding
generic language that addresses the requirements in 40 CFR 52.21(r)(6), which becomes
an applicable requirement when sources determine PSD applicability using a specific
technique.

2007 ORCAA Response: ORCAA agrees and will both amend the condition covering
Changes not Requiring Permit Revision/Off Permit Changes and add an additional
condition that covers the requirements in 40 CFR 52.21(r)(6).

2020 ORCAA Update: The permit condition ORCAA currently uses to address changes
not requiring permit revision and off permit changes reads as follows:

The Permittee may make the changes described in WAC 173-401-722 and WAC
173-401-724 without revising this permit, provided that the changes satisfy the
criteria set forth in those sections, including the requirements to notify ORCAA
and the EPA. [Origin: WAC 173-401-722; and WAC 173-401-724] [Authority:
WAC 173-40 l-600(l)(b)]

ORCAA believes this condition adequately addresses the concern raised in 2007.

Round 2 Evaluation: The general permit condition used by ORCAA to address changes
not requiring permit revisions and off permit changes is a good one. Each of the permits
Region 10 reviewed included the condition referenced by ORCAA. Region 10 is satisfied

ORCAA Title V Program Review - 2020

Page 7


-------
with ORCAA's update regarding off-permit changes and does not consider it a concern
that warrants follow-up.

Regarding the original suggestion to add 40 CFR 52.21(r)(6) to PSD major source
permits, the only PSD major source permit that Region 10 reviewed in 2020 did not
contain a provision that captures the monitoring and reporting requirement that could
apply if a source concludes under WAC 173-400-720(4)(b)(iii)(D) that a modification to
the facility is not subject to PSD. ORCAA should still consider adding such a provision
to all Title V permits held by PSD major sources.

Section C. Monitoring

C-l 2007 EPA Concern: Permits often required monitoring of several parameters, but not all
of the parameters were always referenced as monitoring for a related applicable
requirement. Where several monitored parameters can indicate how an emission unit is
performing, there is no reason to not rely on all of them in some way. ORCAA should
consider more cross-referencing between applicable requirements and monitoring in their
requirements tables.

2007 ORCAA Response: ORCAA would like to know the specific conditions the EPA is
concerned about. Without knowing the specific condition that triggered the EPA's
concern, it is difficult to respond. However, if the EPA's concern is a general concern,
then ORCAA disagrees with the stated conclusion. In accordance with WAC 173-401
permit content requirements, any and all monitoring included in ORCAA's permits have
a basis and are related to an underlying applicable requirement that references the
monitoring condition. Most monitoring required in ORCAA permits is "periodic
monitoring" and for the purpose of assuring compliance with the requirement to properly
operate and maintain pollution control devices. The related or underlying applicable
requirement in most cases is the requirement to properly maintain and operate pollution
control devices. The cross reference from this applicable requirement to the monitoring
condition with the table containing the periodic monitoring requirements for control
devices was intact in the permit reviewed by the EPA. Therefore, ORCAA requests
further clarification of this concern.

2020 ORCAA Update: Every operating parameter required to be monitored in a permit is
linked to a specific applicable emissions limit or work practice standard.

Round 2 Evaluation: Region 10 still believes it is important to recognize opportunities to
assign multiple periodic monitoring requirements to multiple applicable requirements.
Take, for instance, a grain loading standard applicable to a baghouse. ORCAA should
consider referencing both pressure drop monitoring (though bag leak detection
monitoring is preferable) and visible emissions monitoring (commonly Ml through M3)
as periodic monitoring to assure compliance with that emission limit. For visible
emissions limitations, ORCAA should consider referencing both visible emissions
monitoring and pressure drop monitoring. When a control device is used to reduce
emissions to comply with multiple emission limitations, the control device monitoring
should always be referenced as periodic monitoring to assure compliance with all
emission limitations.

ORCAA Title V Program Review - 2020

Page 8


-------
C-2 2007 EPA Concern: Some permits listed the option to require testing as the monitoring
technique for assuring compliance for certain generally applicable emission limits. In
some cases, there was no explanation why no testing (or other monitoring) was being
required or what circumstances could lead to a requirement to test. In other cases,
periodic testing was required without any explanation as to why that frequency
adequately assured compliance. ORCAA should assure the permit includes monitoring
that assures compliance or clearly explain why no monitoring is necessary in the
Technical Support Document.

2007 ORCAA Response: ORCAA does assure that permits include monitoring sufficient
to assure compliance and will strive to better explain the basis for monitoring in the
associated Technical Support Documents to permits.

2020 ORCAA Update: ORCAA past and current policy is to include monitoring
sufficient to assure continuous compliance.

Round 2 Evaluation: ORCAA continues to issue permits with a "monitoring" condition
stating that ORCAA may require that a test be conducted to assure compliance with
generally applicable emission limits. While periodic testing can serve as periodic
monitoring, this condition does not require testing and, therefore, does constitute
monitoring. In the absence of additional periodic monitoring requirements, a permit
relying on this condition to establish periodic monitoring would have no monitoring at
all. All permits must contain monitoring that assures compliance or explain why there is
no need for monitoring. In this case, a decision that no monitoring or testing is necessary
to assure compliance at the time of permit issuance must be explained in the Technical
Support Document.

C-3 2007 EPA Concern: While ORCAA appears to thoroughly document their CAM-related
decisions, in at least one application of CAM, ORCAA required monitoring a parameter
to indicate compliance with a PM standard without establishing the relationship between
the parameter level and PM compliance. In general, surrogate parameter levels, whether
for CAM or not, should be establishes relative to compliance with the standard in
question. Without that, monitoring that parameter does not assure compliance.

2007 ORCAA Response: ORCAA's policy is that surrogate parameters should be
established based on the best available data at the time of permitting. Typically,
monitoring that occurred during the last stack test that demonstrates compliance with the
applicable requirement is used as the basis for establishing the level of surrogate
parameters. In some cases, target operating ranges recommended by the control device
manufacturer are used. In either case, this information should be documented in the
Technical Support Document. ORCAA will strive to do a better job of this in the future.

2020 ORCAA Update: ORCAA has continued with the policy that surrogate parameters
should be established based on the best available data at the time of permitting. Typically,
acceptable operating ranges for surrogate parameters are based on operating data from
stack testing used to determine compliance and are incorporated into permits as
"indicators" of compliance. Operating outside an acceptable operating range for a

ORCAA Title V Program Review - 2020

Page 9


-------
parameter triggers the requirement for Reference Method Testing. ORCAA understands
this to be an acceptable CAM approach for Title V permits.

Round 2 Evaluation: Not explaining in the Technical Support Document how CAM
indicator ranges were established warrants follow-up. A permit Region 10 reviewed for a
PSD major source contained pressure drop indicator ranges for three baghouses subject to
CAM. The Technical Support Document did not explain how the ranges were established
and how they assure compliance with emission limits. ORCAA must explain monitoring
decisions, including CAM decisions, in the Technical Support Document.

Region 10 reviewed the CAM analyses in three permits reviewed as part of this program
review as well as 7 other permits, to evaluate ORCAA's implementation of the CAM
program. Region 10 is still very concerned about ORCAA's approach to CAM
applicability determinations and documentation. One common mistake is the application
of the exception of rules promulgated after 1990. CAM applies to emission units that use
a control device to comply with an emission limitation that is not exempt from CAM. If
the control device is used to comply with non-exempt applicable emission limitations,
CAM still applies. For instance, if an emission unit is subject to a (post 1990) MACT
standard and a SIP limitation and has a control device needed to meet both requirements,
ORCAA should apply CAM to the emission unit for the SIP limitation, but not the
MACT standard. While the MACT monitoring is presumptively acceptable monitoring to
satisfy CAM requirements for the SIP limitation pursuant to 40 CFR 64.4(b)(4), the
assumption can be rebutted through presentation of new information (e.g., MACT test
reports). It is ORCAA's responsibility to review MACT test reports at time of Title V
permit renewal to assess the strength of the relationship between the MACT indicator
(e.g., Boiler MACT - opacity) and the emission limit (e.g., Boiler MACT - RM5 PM). If
the relationship between the indicator and pollutant is not sufficient to assure compliance
with the SIP limit, the presumption is rebutted and the MACT monitoring is not CAM for
the SIP limit.

Opacity limits should also be factored into the CAM analysis. If a COMS is required
under authority other than CAM, then the permittee is required to use the COMS to
satisfy CAM for all visible emissions limits pursuant to 40 CFR 64.3(d). The COMS may
also be required to assure compliance with PM emission limits.

Emission units that use continuous compliance determination monitors for a specific
pollutant are exempt from CAM. When an emission unit has a continuous emission
monitoring system that is not the compliance determination method (a reference method
test is the compliance determination method), but rather just an indicator of compliance,
the pollutant-specific emission unit is still subject to CAM. ORCAA's permits should
clarify when a required continuous monitoring system is the compliance determination
method.

Permits should include applicable CAM requirements from 40 CFR 64.7 through 64.9.
The Technical Support Document (where the CAM applicability analysis should be)
should present pre- and post-control potential emissions (for applicability and monitoring
frequency decisions, respectively) as part of the CAM applicability analysis. ORCAA

ORCAA Title V Program Review - 2020

Page 10


-------
should re-evaluate CAM applicability in their permits at time of permit renewal to assure
CAM has been applied correctly.

Section D. Public Participation and Affected State Review

D-l 2007 EPA Concern: Like many of the permitting authorities across the country, ORCAA
provides the permittee with a pre-draft permit for review and comment before the draft
permit goes out for public comment. Soliciting the permittee's input on the factual
aspects of the permit can help to reduce errors in the permit and help educate the
permittee on its obligations under the permit. Working with the permittee on developing
the substantive requirements of the permit, however, can create the impression that the
permit issuance process is not an open process. ORCAA should carefully balance these
interests as it works with permittees during the development and issuance of Title V
permits.

2007 ORCAA Response: ORCAA understands the EPA's concerns and will be careful
to consider only factual input from regulated sources regarding their pre-draft permits.
Frequently, we need technical input from sources for gap-filling purposes, but these
interactions never involve loosening of requirements.

2020 ORCAA Update: ORCAA continues to provide permittees an opportunity to
review their preliminary draft permits and Technical Support Documents. However,
changes resulting from such reviews are limited to correcting misinformation only.
ORCAA does not collaborate with permittees on substantive requirements at any time
during the permit process. Permittees are allowed to submit their comments on draft
permits the same as the general public and ORCAA addresses all comments publicly.

Round 2 Evaluation: This is generally not an issue when the agency documents the basis
for all of the requirements in the permit and assures that all comments received during the
public comment period are documented and addressed before the permit is issued.
ORCAA understands and implements their program this way. Region 10 is satisfied with
ORCAA's approach for ensuring transparency and no longer considers this a concern that
warrants follow-up.

Section E. Permit Issuance / Revision / Renewal

E-l 2007 EPA Concern: ORCAA's fee structure bases part of the fee on the number of
emission units to account for permit complexity. The emission unit concept in Title V
generally allows useful flexibility in grouping or non-grouping of plant site activities
based on a number of factors such as similar applicable requirements or operations. This
can make implementation of the permit requirements more practical. Placing a price (by
basing the fee) on the number of emission units can put these intentions at odds with each
other. To deal with that, ORCAA defines the number of emission units for fee purposes
differently than the emission units identified by the permit. While this may work,

ORCAA should clarify this distinction some place, possibly including the statement of
basis.

ORCAA Title V Program Review - 2020

Page 11


-------
2007 ORCAA Response: ORCAA's Rule 1.4 includes definitions for the terms "Fee
Eligible Generating Equipment" and "Fee Eligible Stack." ORCAA believes this
sufficiently covers the EPA's stated concern but will consider incorporating this
distinction in Technical Support Documents of future permits.

2020 ORCAA Update: The number of pieces of equipment used to determine annual
fees is included in ORCAA's annual budget process and available for public review. This
happens every year. Therefore, including the same information in the permit or Technical
Support Documents, which are subject to review every five years, would be problematic
in that it would need to be revised if changed during an annual budget cycle.

Round 2 Evaluation: Region 10 is satisfied with ORCAA's update and does not consider
this a concern that warrants follow-up.

Section G. Resources and Internal Management Support

G-l 2007 EPA Concern: ORCAA generally distributes non-labor Title V costs based upon
FTE spent in each separately funded program. This is an efficient way to account for
costs which are otherwise very difficult to track separately. Expenses, such as travel to
Title V training, might be an exception to this approach that could be easily attributed to
only Title V.

2007 ORCAA Response: ORCAA's accounting system is capable of tracking direct,
non-labor, Title V expenses. ORCAA's current policy is that expenses like the cost for
lodging and meals associated with a Title V conference be directly accounted for as a
Title V expense. Travel costs such as the cost of airfare or gas can also be accounted for
in this way directly to Title V. However the cost of gas for a round trip to Seattle in a
hybrid vehicle to participate in a Title V conference has been accounted for on an FTE
basis. ORCAA believes this is sufficient cost accounting for Title V.

2020 ORCAA Update: There are very few non-labor Title V costs that are not general in
nature and attributable to all ORCAA programs. However, ORCAA's accounting system
is capable of tracking direct, non-labor, Title V expenses for things like Title V training.

Round 2 Evaluation: Region 10 is satisfied with ORCAA's update and does not consider this a
concern that warrants follow-up.

III. Additional Review

In addition to reviewing concerns identified in the first review, Region 10 requested an update
about program resources and permit issuance progress and reviewed three permits that were
issued by ORCAA within the last few years. As explained in Section I of this report, the
following permits were reviewed by Region 10 as part of this program review:

Permit No.	Company Name & Location	Date Issued

16AOP1172	Simpson Door Company McCleary, WA	07/20/2018

15AOP1129	Crown Cork & Seal Company Olympia, WA	09/01/2016

12AOP915	Weyerhaeuser NR Company	11/20/2019

ORCAA Title V Program Review - 2020

Page 12


-------
The focus of the permit reviews was generally on previously identified concerns and specifically
on compliance assurance monitoring requirements and incorporation of new requirements. In the
process of reviewing a selection of ORCAA's permits, we also gain a perspective of ORCAA's
general permit quality. CAM has been a recent focus for Region 10's oversight work for several
reasons. CAM is required to be applied in the initial permit for sources with "large" pollutant-
specific emission units and in the first renewal for all other emission units. Most pollutant-
specific emission units are not large, so CAM has been primarily implemented during the
renewal phase of the Title V program. Region 10 had a rigorous permit oversight program in the
early years of Title V. By the time state and local agencies were issuing renewal permits, Region
10 had scaled back its oversight program substantially and, in fact, reviewed very few permits
that addressed CAM. Beginning in fiscal year 2013, Region 10 began to review a small
percentage of state/local renewal permits to see how CAM was being addressed. A consistent
lack of documentation regarding CAM applicability and monitoring decisions in Technical
Support Documents was discovered. Logically, Region 10 decided to specifically review how
CAM was being addressed in permits as part of the second-round program reviews. Region 10's
review of ORCAA's CAM implementation is addressed in previous Concern C-3. ORCAA's
incorporation of new applicable requirements is covered in the New Concerns section of the
report below. Other new concerns about ORCAA's permits are also in that section of the report.
In reviewing the agency's permit issuance progress and resources, including their fee program
and staffing, we learn how the Title V program is being managed. Permit issuance problems,
namely large backlogs of unissued permits, are often linked to a lack of resources. ORCAA
reports their permit issuance progress semiannually. That data indicates ORCAA's backlog
includes four renewals which have been extended past the permit expiration dates. Three of those
permits have been drafted and one may become a minor source.

ORCAA provided Region 10 with recent budget data. ORCAA uses the same fee structure as the
Washington Department of Ecology and other local agencies in Washington. Total Title V fees
needs are divided into three equal assessments each year: complexity (based on the number of
emission units), emissions (emitted by each Title V source) and a flat fee assessed to each Title
V source. The annual program budget is set by multiplying the number of Title V sources by the
fee basis. If collected fees are projected to be overspent, a supplemental billing is assessed.
Collected fees left over at the end of the year are carried into the next year where it reduces the
fees collected for that year. This is a good system that allows the agency a lot of flexibility.
ORCAA is fully staffed with a healthy range of experienced and new staff. Training is provided
primarily internally with some outside training courses. The biennial Region 10 Title V
workshop plays a role in training staff. Engineers are assigned to specific sources and can be
responsible for permit writing (construction permits as well), inspections, public hearings and
emission inventories. Compliance staff also perform inspections and handle enforcement cases.
Staff retention seems good at the agency.

ORCAA appears to manage their fees and expenses very well. Combined with their reasonable
permit backlog, Region 10 has no concerns about ORCAA's management of their resources.

New Suggestions

1. Regarding ORCAA's incorporation of new requirements, Region 10 thinks it is a good
practice to add a section to the Technical Support Document that describes the new

ORCAA Title V Program Review - 2020

Page 13


-------
applicable requirements that are being added to a renewal permit. Including a broader-scoped
section that describes all changes to the permit (in this renewal) would also be good and
could encompass the new applicable requirements. ORCAA's Technical Support Document
did not have a section that described the changes or even the new applicable requirements.
ORCAA should consider adding one.

2.	Each Technical Support Document reviewed presented both actual and potential emissions.
The emission inventory, however, was not available. Region 10 thinks that documentation of
emissions estimations in the Technical Support Document is important, because they support
applicability decisions and reflect important details about the operations (at the emission
estimation level).

3.	Region 10 reorganized, changing our office and unit structure into a division, branch and
section structure. This changed our mailing addresses. Where ORCAA includes the address
in permits for mailing copies of certain documents to Region 10, the permits should be
revised accordingly. Region 10 can supply the new addresses if needed.

New Concerns

1.	The incorporation of the boiler MACT into one permit reviewed could have been better.
Errors were made incorporating applicable requirements. Obsolete boiler MACT
requirements included in the renewal could have been omitted. Some compliance options that
are clearly not options for that particular source also could have been omitted. In those cases
where the compliance option chosen by the source is clear, the Technical Support Document
can explain that. If the other options are no longer possible, the permit can also be cleaned up
by removing the compliance options not used. Permit language could have been added to
address (1) updating operating limits to reflect values measured during testing, and (2)
alternate compliance options. This should be applied to all the permits that ORCAA issues.

2.	The "Regulatory Basis" section of permits includes these statements: "Conditions identified
as "state/local only" are enforceable only by ORCAA and the State of Washington.
Conditions identified as "local only", "state only", or "state/local only" are not federally
enforceable." ORCAA should clarify the difference between "state only" and "state/local
only." If a state requirement is being added to the permit, ORCAA should have the authority
to enforce it, so there may be no need for a "state only" label.

3.	It appears that ORCAA is not adding older SIP-approved rules that are still applicable to the
permit. Applicable SIP-approved rules must be in the permit. This can be done by adding
those specific requirements as permit conditions, adding those additional citations to already
existing conditions that are identical, streamlining with similar conditions or including a
cross referencing table to connect old SIP citations to new state or local requirements.

4.	In one plant-wide permit condition, ORCAA is limiting RM5/2002 PM emissions from
process units to no more than 0.1 gr/dscf. But the two underlying regulations are numerically
different (one is more stringent than the limit in the permit) with different reference methods
for measuring PM. WAC 173-400-060's limit is 0.1 gr/dscf with PM measured using RM5.
ORCAA 8.3(a)'s limit is 0.10 gr/dscf with PM measured using methods on file at ORCAA to
measure RM5 front & back half. Unless ORCAA intends to streamline these emission limits,

ORCAA Title V Program Review - 2020

Page 14


-------
ORCAA needs to incorporate them into the permit as separate conditions. In addition,
ORCAA 8.3(a) does not explicitly reference RM5 and 202. Instead, the regulations reference,
"particulate test procedures, on file at the Authority... The Authority includes the Method 5
back-half condensable particulate matter." RM5 does not specify a methodology for
measuring back-half PM. ORCAA should consider updating ORCAA 8.3(a) (and (b)) to
explicitly reference EPA RM5 and 202 so that its authority to reference those test methods in
the permit is clear.

5.	Certain state or local visible emission limitations restrict the number of 15-second readings
that can be greater than a threshold value over a standard period of time. See Ecology
Method 9A. When ORCAA prescribes a COMS (satisfying NSPS or NESHAP performance
specifications) as periodic monitoring for these Ecology Method 9A limitations, ORCAA
should explicitly require in the permit that the monitoring system (required by federal
standards to generate 6-minute average VE readings) also generate data in a format to enable
a compliance determination for the Ecology Method 9A limitations. Alternatively, ORCAA
may be able to streamline the requirements, though this is not always easy for these types of
opacity limits.

6.	On the occasion that an emission unit is subject to more than one PM emission limit (e.g.,
NSPS Db and Boiler MACT), and the underlying testing methodology for determining PM
emissions is different (e.g., significantly different probe temperatures), it is critical that
ORCAA understand the difference between the two methodologies and prescribe appropriate
compliance demonstrations in the permit. The more stringent Boiler MACT PM limit is
associated with a test method more likely to quantify more filterable PM emissions due to the
lower probe temperature. But the permit specified the NSPS Db test method with a higher
probe temperature likely to under report filterable PM emissions as defined by Boiler MACT.
ORCAA should explain the issue and its decision making in the Technical Support
Document, especially if it decides to streamline the testing requirements.

7.	The state citation for sufficiency monitoring [70.6(c)(1)] is 173-401-630(1). The permits we
reviewed do not include this citation. Where ORCAA is enhancing the testing, monitoring,
recordkeeping or reporting requirements required outside the permit, the sufficiency
monitoring citation is more appropriate than the gap filling monitoring citation [173-401-
615(l)(b)] that is more commonly used in the permits we reviewed. Gap filling authority is
only appropriate when there is no testing, monitoring, recordkeeping or reporting in the
underlying applicable requirement. When information exists to assess the degree to which
MACT monitoring does (or does not) assure compliance with the emission limit, ORCAA
should review that information at time of Title V permit renewal, and if necessary,
supplement the monitoring through its sufficiency monitoring authority.

8.	The Technical Support Document should explain each condition in the permit. Even if
ORCAA does not go that far, the Technical Support Document must explain all decisions
regarding testing, monitoring, recordkeeping and reporting. Once all of the requirements that
apply to the source have been compiled, deciding whether the testing, monitoring,
recordkeeping and reporting requirements are adequate is probably the most important aspect
of permit writing. To that end, there are several facts that should be considered when making
these decisions (and there is guidance available). Past test results are some of the facts that
should be considered. When there are past test results, ORCAA should present that data in

ORCAA Title V Program Review - 2020

Page 15


-------
the Technical Support Document, consider it in the permit decisions and explain it in the
Technical Support Document.

9.	Section 3.0 of one reviewed Technical Support Document includes this statement regarding
insignificant emission units (IEUs): Company X includes many emissions units that qualify
as Insignificant Emissions Units (IEUs) under the provisions for IEUs in WAC 173-401-530.
Chapter 173-401 WAC exempts IEUs from Title V monitoring, record keeping and reporting
requirements." However, Chapter 173-401 does not exempt IEUs from Title V monitoring.
Section 173-401-530(1) states that "designation as an IEU does not exempt it from any
applicable requirement." Section 173-401-530(2)(a) states that "notwithstanding any other
provision of this chapter, no emission unit subject to a federally enforceable applicable
requirement (other than generally applicable requirements of the SIP) shall qualify as an
IEU" and "Generally applicable requirements of the SIP are those federally enforceable
requirements that apply universally to all emission units without reference to specific types
of emission units." So, ORCAA should revise the general statement about IEU exemptions
and decide whether it is appropriate to add monitoring to assure that IEUs are in compliance
with the requirements that apply.

10.	The TSD should include an applicability statement regarding 40 CFR Part 68. Determining
applicability requires knowing, among other things, whether the source stores certain
quantities of regulated materials onsite. If ORCAA cannot confirm whether Part 68 applies, it
can simply include a statement in the permit that states something to the effect "if the source
stores quantities of regulated materials that make it subject to Part 68, then the source must
comply with those provisions." If ORCAA is going to claim that Part 68 does not apply, it
will need to more comprehensively confirm the amounts of materials stored at the source.

IV. Summary of Concerns

Some of the concerns identified in the first-round program review have been resolved to Region
10's satisfaction, but some still require attention. Region 10 is satisfied with ORCAA's progress
on four of the eight concerns identified in the 2007 program review. Region 10 thinks ORCAA
can still improve on the other four remaining original concerns. Region 10 has identified ten new
concerns and three new suggestions.

ORCAA has made improvements to their permits and Technical Support Documents, but more
improvements can be realized.

ORCAA can improve their permits:

•	By creating a condition to address 52.21(r)(6) (Concern A-2);

•	By more completely linking testing, monitoring, recordkeeping and reporting to
applicable emission limits (Concern C-l);

•	By revising the EPA's mailing address (New Suggestion 3);

•	By improving the incorporation of new federal requirements such as the boiler MACT
(New Concern 1);

•	By clarifying or removing the state-only citation label (New Concern 2);

•	By including all applicable SIP citations (New Concern 3);

•	By clarifying PM and visible emission testing (New Concerns 4, 5 and 6); and

•	By citing the sufficiency monitoring authority (New Concern 7).

ORCAA Title V Program Review - 2020

Page 16


-------
ORCAA can improve their Technical Support Documents:

•	By documenting their testing decisions (Concern C-2);

•	By improving their CAM applicability determinations and documentation (Concern C-3);

•	By including a section that includes new requirements (New Suggestion 1);

•	By including a detailed emission inventory (New Suggestion 2);

•	By using and documenting the use of past test data to set monitoring and testing
requirements in permits (New Concern 8);

•	By clarifying how IEUs are addressed in the permit (New Concern 9); and

•	By addressing Part 68 applicability (New Concern 10).

V. Recommendations

ORCAA should provide to Region 10 a response that explains what they plan to do to address
these concerns and suggestions: Concerns A-2, C-l, C-2 and C-3; New Concerns 1 thru 10; and
New Suggestions 1-3. If SRCAA prefers to discuss any of the concerns before responding,
Region 10 will gladly accommodate that.

ORCAA Title V Program Review - 2020

Page 17


-------
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

REGION 10

1200 Sixth Avenue, Suite 155

Seattle, WA 98101-3123	air & radiation

DIVISION

April 29, 2020

Ms. Fran McNair
Executive Director
Olympic Regional Clean Air Agency
2940 Limited Lane NW
Olympia, Washington 98502

Dear Ms. McNair:

The purpose of this letter is to notify you that the U.S. Environmental Protection Agency, Region 10
plans to perform a second evaluation of the Olympic Regional Clean Air Agency's Title V Operating
Permit Program. This letter kicks off the effort by describing the evaluation process and our proposed
schedule. We are also requesting information that will assist us in our program evaluation. Your agency
will be the tenth and final of the second-round program evaluations that Region 10 will undertake.

This program evaluation will focus primarily on the following four areas:

(1)	follow-up on concerns identified during our 2007 evaluation of your program;

(2)	permit issuance progress and resources;

(3)	compliance assurance monitoring; and

(4)	new applicable requirements and rules. We will review a selection of your permits, focusing on
those issued more recently. This program review will require involvement of staff and managers
from your permitting, technical, finance and compliance groups. We appreciate your cooperation
and assistance.

Our tentative schedule is as follows:

Task

Tentative Date

Region 10 sends kickoff letter

Today

ORCAA sends requested information

May 29, 2020

Region 10 meets with ORCAA

June 15 & 16, 2020

Region 10 sends draft report

August 1, 2020

ORCAA sends comments to Region 10

August 16, 2020

Region 10 sends final report

September 15, 2020

The enclosure describes the information we would like to receive in advance, so we can be efficient
during the interviews. Please return the information in electronic form as early as possible, but no later
than the date in the table above, to Christopher Familiare at familiare.christopher@epa.gov who will be
leading the evaluation. We will contact you if we need any additional information.

f Q \

\ /


-------
We look forward to working with you and your staff. If you have any questions about the program
evaluation, please do not hesitate to call me at (206) 553-1679 or Chris at (206) 553-1250.

Sincerely,

/s/ April 29, 2020

Kelly McFadden, Chief
Air Permits and Toxics Branch

Enclosure

cc: Mr. Mark Goodin

Professional Engineer, ORCAA


-------
Title V Program Evaluation
Olympic Regional Clean Air Agency

Information Request

Please send the following information in electronic form as soon as possible, but no later than May 29,
2020, to Christopher Familiare at familiare.christopher@epa.gov.

1.	A list of Olympic Regional Clean Air Agency staff that work in the Title V program, noting their
responsibilities (e.g. permit writer, rule writer, inspector, etc.).

2.	Identification of any Title V permits, renewals, or revisions that are recent enough that they are
not represented on the Olympic Regional Clean Air Agency website.

3.	A list and description of any rule changes that have been made to Olympic Regional Clean Air
Agency's Title V regulations (e.g. those that affect applicability, implementation, or fees) since
the last revision approved in September of 2001. If any of the rule changes have been submitted
to Region 10 for review, note the date of submittal.

4.	An update regarding each of the concerns raised in the 2007 Title V program evaluation, noting
whether the plan to address the concern was completed and whether Olympic Regional Clean Air
Agency is approaching any of the concerns differently than previously communicated to
Region 10 in December 2007. Provide a narrative explaining the different approach, if
applicable.

5.	Any issues or requests that Olympic Regional Clean Air Agency would like to raise to Region 10
regarding any aspect of the Title V program.


-------
2020 Status Update for ORCAA
Progress Towards Resolving Concerns from
2007 Title V Program Review

May 27, 2020
A. Title V Permit Preparation and Content

A-l. "In at least one permit, ORCAA has incorporated an NSPS requirement by reference, citing
only the subpart and listing none of the specific requirements that apply to the source. To be an
effective compliance tool, permit should be as clear as possible about the requirements that
apply and add specific monitoring that assures compliance. Simply referencing at the NSPS
subpart level is not an adequate level of detail for Title V. ORCAA should specifically list in each
permit the requirements from any NSPS that apply."

2020 Status Update:

High Level vs. Low Level Citing of NSPS/NESHAP

ORCAA reconsidered their previous plan of continuing with a policy of incorporating
applicable NSPS, NESHAPS and MACT standards into permits using "high level"
incorporation by reference (see ORCAA responses 12/14/2007). Starting in 2011 with
the permit renewal for Nippon Paper Industries (now McKinley Paper), ORCAA switched
to a policy of incorporating specific requirements from applicable NSPS/NESHAP/MACT
standards. Permit renewals issued after this date should reflect detailed requirements
from applicable federal standards with the exception of Reference Test Methods, and
QA/QC standards and performance specifications for required monitors, which are still
incorporated into permits by reference.

There remains one permit, the permit for Sierra Pacific Cogeneration, that predates
ORCAA's transition from a policy of incorporating federal requirements by reference to
incorporating specific requirements, which started in 2011. This permit is up for renewal
and a draft permit is scheduled to be issued sometime in June 2020.

Listing Applicable Requirements

The second concern raised was that one of the permits reviewed in 2007 did not
specifically list applicable requirements. ORCAA's current policy is to incorporate specific
limits and operating standards from applicable requirements. All permits except the
permit for Sierra Pacific Cogeneration were drafted under ORCAA's current policy and
should reflect specific limits, standards and other requirements from applicable
requirements.


-------
A-2. "In ORCAA's permits, the standard Terms and Conditions section presents off permit
change provisions but did not specify that off-permit changes require notification to the
agency. This should be added. ORCAA should also consider adding generic language that
addresses the requirements in 40 CFR 52.21(r)(6), which becomes an applicable requirement
when sources determine PSD applicability using a specific technique."

2020 Status Update:

The permit condition ORCAA currently uses to address changes not requiring permit
revision and off permit changes reads as follows:

The Permittee may make the changes described in WAC173-401-722 and WAC
173-401-724 without revising this permit, provided that the changes satisfy the
criteria set forth in those sections, including the requirements to notify ORCAA
and EPA.

[Origin: WAC 173-401-722; and WAC 173-401-724]

[Authority: WAC 173-401-600(1)(b)]

ORCAA believes this condition adequately addresses the concern raised in 2007.

B.	General Permits - No concerns stated in 2007 Title V Program review Final Report.

C.	Monitoring

C-l. "Permits often require monitoring of several parameters, but not all of the parameters
were always referenced as monitoring for a related applicable requirement. Where several
monitored parameters can indicate how an emission unit is performing, there is no reason to
not rely on all of them in some way. ORCAA should consider more cross-referencing between
applicable requirements and monitoring in their requirements tables."

2020 Status Update:

Every operating parameter required to be monitored in a permit is linked to a specific
applicable emissions limit or work practice standard.

C-2. "Some permits listed the option to require testing as the monitoring technique for assuring
compliance for certain generally applicable emission limits. In some cases, there was no
explanation why no testing (or other monitoring) was being required or what circumstances
could lead to a requirement to test. In other cases, periodic testing was required without any
explanation as to why that frequency adequately assured compliance. ORCAA should assure the
permit includes monitoring that assures compliance or clearly explain why no monitoring is
necessary in the Statement of Basis."


-------
2020 Status Update:

ORCAA past and current policy is to include monitoring sufficient to assure continuous
compliance.

C-3. "While ORCAA appears to thoroughly document their CAM-related decisions, in at least
one application of CAM, ORCAA required monitoring a parameter to indicate compliance with a
PM standard without establishing the relationship between the parameter level and PM
compliance. In general, surrogate parameter levels, whether for CAM or not, should be
established relative to compliance with the standard in question. Without that, monitoring that
parameter does not assure compliance."

2020 Status Update:

ORCAA has continued with the policy that surrogate parameters should be established
based on the best available data at the time of permitting. Typically, acceptable
operating ranges for surrogate parameters are based on operating data from stack
testing used to determine compliance and are incorporated into permits as "indicators"
of compliance. Operating outside an acceptable operating range for a parameter
triggers the requirement for Reference Method Testing. ORCAA understands this to be
an acceptable CAM approach for Title V permits.

D. Public Participation and Affected State Review

D-l. "Like many of the permitting authorities across the country, ORCAA provides the permittee
with a pre-draft permit for review and comment before the draft permit goes out for public
comment. Soliciting the permittee's input on the factual aspects of the permit can help to
reduce errors in the permit and help educate the permittee on its obligations under the permit.
Working with the permittee on developing the substantive requirements of the permit,
however, can create the impression that the permit issuance process is not an open process.
ORCAA should carefully balance these interests as it works with permittees during the
development and issuance of Title V permits.

2020 Status Update:

ORCAA continues to provide permittees an opportunity to review their preliminary draft
permits and Technical Support Documents. However, changes resulting from such
reviews are limited to correcting misinformation only. ORCAA does not collaborate with
permittees on substantive requirements at any time during the permit process.
Permittees are allowed to submit their comments on draft permits the same as the
general public and ORCAA addresses all comments publicly.


-------
E. Permit Issuance/Revision/Renewal

E-l. ORCAA's fee structure bases part of the fee on the number of emission units to account for
permit complexity. The emission unit concept in Title V generally allows useful flexibility in
grouping or non-grouping of plant site activities based on a number of factors such as similar
applicable requirements or operations. This can make implementation of the permit
requirements more practical. Placing a price (by basing the fee) on the number of emission
units can put these intentions at odds with each other. To deal with that, ORCAA defines the
number of emission units for fee purposes differently than the emission units identified by the
permit. While this may work, ORCAA should clarify this distinction some place, possibly
including the statement of basis.

2020 Status Update:

The number of pieces of equipment used to determine annual fees is included in
ORCAA's annual budget process and available for public review. This happens every
year. Therefore, including the same information in the permit or Technical Support
Documents, which are subject to review every five years, would be problematic in that it
would need to be revised if changed during an annual budget cycle.

F.	Compliance

F-l. The focus of this Title V program review was on ORCAA's implementation of its Title V
program. Accordingly, in conducting this Title V, EPA reviewed ORCAA's compliance certification
and semiannual monitoring report forms but did not review completed forms submitted by
Title V facilities to determine the extent of compliance with Title V requirements in ORCAA's
jurisdiction and whether ORCAA is taking appropriate enforcement actions in response to
noncompliance. EPA also conducts periodic reviews of state and local clean Air Act enforcement
programs which look at, among other things, source compliance and enforcement actions.

2020 Status Update:

ORCAA's compliance inspections and enforcement actions are well documented.

G.	Resources and Integral Management Support

G-l. ORCAA generally distributes non-labor Title V cost based upon FTE spent in each
separately funded program. This is an efficient way to account for costs which are otherwise
very difficult to track separately. Expenses, such as travel to Title V training, might be an
exception to this approach that could easily be attributed to only Title V.


-------
2020 Status Update:

There are very few non-labor Title V costs that are not general in nature and
attributable to all ORCAA programs. However, ORCAA's accounting system is capable of
tracking direct, non-labor, Title V expenses for things like Title V training.


-------
ORCAA Staff Tile V Responsibilities
May 27, 2020

Dept.

Staff/Title

Title V Responsibilities



Fran McNair,

• Agency management



Executive Director

•	Final permit review and stamping (Title V & NSR)

•	Hearings Officer for public hearings

c

Debbie Moody,

• Administrative processing for all permits

o

Office Mgr/Public Records Officer

• Public hearing administration

ĤM



• Title V fee billing

E

Dan Nelson,

• ORCAA's website administrator

E
Ĥa

Public Information Officer

• Public hearings

<

Lynn Harding.

• Responsible for overall agency budget



Administrative Services Manager

• Assists with developing Title V budget



Jackie Wallner,

No direct Title V responsibilities



Customer Service/Records Clerk





Mark Goodin, P.E.

• Title V program manager



Engineering Manager

•	Permit review and PE sign-off (Title V and NSR)

•	Workload forecasting and Title V budget

•	Permit writer (Title V& NSR)

•	Inspections and testing observation

CuO



• Public hearings

c

Jennifer DeMay, P.E.

• Permit writer (Title V& NSR)

cu
c

Engineering Supervisor

• Inspections & testing observation

CuO

c

LU



•	Public hearings

•	Emissions Inventory/Title V fee cacluation



Aaron Manley, P.E.

• Permit writer (Title V& NSR)



Engineer II

•	Inspections & testing observation

•	Public hearings



Lauren Whybrew,

• Permit writer in training (Title V & NSR)



Engineer 1

• Emissions Inventory training



Robert Moody,

• Compliance manager



Compliance Manager

•	Inspections, Report Reviews & testing observation

•	Complaint response

•	Enforcement



Mike Shults,

• Inspections, Report Reviews & testing observation

cu
u

Compliance Supervisor

• Complaint response

fO



• Enforcement

Q.

E

Tony Gibson,

• Inspections, Report Reviews & testing observation

o
u

Air Quality Specialist II

•	Complaint response

•	Enforcement



Allie Feidt,

No current Title V responsibilities



Air Quality Specialist 1





Seamus Shevlino,

No current Title V responsibilities



Air Quality Specialist 1



CuO

Nick Grant,

No direct Title V responsibilities

c

Network Administrator/Monitoring



° l_

Specialist



o

5

Odelle Hadley,

No direct Title V responsibilities



Senior Monitoring Specialist




-------OCR error (D:\Scanspot\Jobroot\ps1\MJA00045\tiff\P1018TM1.tif): Saving image to "D:\Scanspot\Jobroot\ps1\MJA00045\tiff\P1018TM1.T$F.T$F" failed.

-------
ORCAATOPS History























Half-year

Total
Sources
(2.c)

Active
Permits (3)

Initial
Permits
issued (4.a)

Initial issued
< 18 mo.
(4-b)

Outstanding
initial App.
(5)

Expired
Permits
(6.a)

Extended
Permits
(6.b)

Sig. Mod
issued (7.a)

Sig. Mod
issued < 18
mo. (7.b)

Outstanding
Sig. Mod. >
18 mo (8)

% extended
in (H)

%

outstanding

(F) +

extended
(H)

2016-1

12

12

0

0

0

0

5

0

0

0

42%

42%

2016-2

15

13

0

0

1

0

8

1

1

0

62%

60%

2017-1

11

11

0

0

0

0

6

0

0

0

55%

55%

2017-2

11

11

0

0

0

0

6

0

0

0

55%

55%

2018-1

11

11

0

0

0

0

5

0

0

0

45%

45%

2018-2

11

11

0

0

0

0

4

0

0

0

36%

36%

2019-1

11

11

0

0

0

0

4

0

0

0

36%

36%

2019-2

11

11

0

0

0

0

4

0

0

0

36%

36%

2020-1

11

11

0

0

0

0

4

0

0

0

36%

36%


-------