&EPA

Office of Water
Fiscal Year 2011

H JESUS


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

Subobjective 2.1.1 Water Safe to Drink



2.1.1

Percent of the population served by community
water systems that receive drinking water that
meets all applicable health-based drinking
water standards through approaches including
effective treatment and source water protection.

OMB PA
BUD
SG
NPMStat
ARRA

91%

91%

90%

89%

75%

88%

93%

95%

88%

93%

90%

95%

91%



93%



FY 2010 COMMITMENT





89.9%



89%

75%

88%

91.7%

95%

88%

92%

90%

95%

91%







FY 2009 END OF YEAR RESULT





92%



92%

79%

89.9%

93.7%

95.4%

89.7%

94.1%

95.8%

96.9%

96.4%







FY 2008 END OF YEAR RESULT





92%



91%

82%

89.6%

94.1%

94.9%

89.4%

83%

96%

97.5%

96.1%







FY 2005 BASELINE





89%



92.5%

55.3%

93.2%

93.0%

94.1%

87.8%

91.2%

94.7%

94.6%

94.8%







FY 2010 UNIVERSE (in millions)





293.5



15.0

30.4

25.4

57.7

43.3

37.8

11.9

10.5

50.2

11.3







National Program Manager Comments

The universe represents the population served by community water systems. The National target for FY 2011 is higher than the regional aggregate target to be consistent with the FY 2011 budget target.

SP-1

Percent of community water systems that meet
all applicable health-based standards through
approaches that include effective treatment and
source water protection.

OMB PA
BUD
SG

90%

90%

87%

83%

82%

80%

90%

91%

85%

87%

90%

88%

90%



90%



FY 2010 COMMITMENT





87%



83%

82%

80%

90.4%

90%

85%

87%

90%

90%

88%







FY 2009 END OF YEAR RESULT





89.1%



85.7%

86.0%

90.7%

90.9%

93.0%

87.8%

87.5%

90.0%

87.9%

88.0%







FY 2008 END OF YEAR RESULT





89%



85%

86%

91%

91%

91.4%

86.8%

88%

90%

88.7%

87.9%







FY 2005 BASELINE





89%



85.7%

86.4%

91.8%

91.0%

92.0%

86.2%

86.8%

90.3%

91.6%

87.3%







FY 2010 UNIVERSE





51,388



2,714

3,624

4,462

8,808

7,332

8,231

4,106

3,223

4,492

4,396







National Program Manager Comments

New measure starting in FY 08. FY 07 end-of-year data not from ACS. The National target for FY 2011 is higher than the regional aggregate target to be consistent with the FY 2011 budget target.

SP-2

Percent of "person months" (i.e. all persons
served by community water systems times 12
months) during which community water
systems provide drinking water that meets all
applicable health-based drinking water
standards.

OMB PA
BUD
SMM

95%

95%

95%

94%

90%

95%

96%

96%

94%

95%

95%

98%

95%



97%



FY 2010 COMMITMENT





94.9%



94%

90%

95%

95.2%

96%

94%

95%

95%

98%

95%







FY 2009 END OF YEAR RESULT





97.2%



97.5%

91.9%

96.9%

98.3%

97.8%

96.2%

98.2%

99.0%

98.6%

98.7%







FY 2008 END OF YEAR RESULT





97%



95.9%

91.2%

98.2%

98.2%

97.3%

95.7%

97%

99%

99.1%

98.3%







FY 2005 BASELINE





97%



96%

92%

99%

98%

97%

97%

98%

99%

97%

98%







FY 2010 UNIVERSE (in millions)





3,525.1



180.2

365.6

305.9

693.1

519.9

454.1

142.8

126.0

602.0

135.5







National Program Manager Comments

Indicator measure in FY 07.

SP-3

Percent of the population in Indian country
served by community water systems that
receive drinking water that meets all applicable
health-based drinking water standards.

BUD
SMM

87%

87%

87%

95%

95%

n/a

90%

95%

80%

80%

87%

70%

87%



88%



FY 2010 COMMITMENT





82.2%



95%

95%

n/a

89%

95%

78%

85%

87%

75%

87%







FY 2009 END OF YEAR RESULT





81.2%



99.9%

99.6%

n/a

100.0%

99.3%

87.2%

83.3%

90.4%

68.1%

87.2%







FY 2008 END OF YEAR RESULT





83%



100%

53.1%

n/a

89.8%

96.9%

83.6%

87%

88.2%

73.4%

99%







FY 2005 BASELINE





86%



100.0%

100.0%

n/a

100.0%

99.5%

90.4%

86.5%

82.6%

80.9%

88.1%







FY 2010 UNIVERSE





879,658



90,594

11,071

n/a

20,962

106,972

71,173

5,394

90,832

433,933

48,727







National Program Manager Comments

The universe represents the population in Indian country served by community water systems.

Page 1 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

SP-4a

Percent of community water systems where risk
to public health is minimized through source
water protection

OMB PA

50%

50%

39%

64%

60%

25%

38%

38%

50%

18%

45%

9%

40%



50%



FY 2010 COMMITMENT





35.4%



64%

60%

25%

38%

38%

36%

18%

44%

8%

35%







FY 2009 END OF YEAR RESULT





35%



64%

60%

27%

38%

38%

38%

9%

38%

8%

38%







FY 2008 END OF YEAR RESULT





32%



64%

58%

25%

30%

40%

25%

17%

37%

8%

35%







FY 2005 BASELINE





20%



51%

30%

12%

21%

19%

19%

13%

20%

1%

28%







FY 2010 UNIVERSE





51,388



2,714

3,624

4,462

8,808

7,332

8,231

4,106

3,223

4,492

4,396







National Program Manager Comments

FY 07 end-of-year data not from ACS. The universe is the number of community water systems. The National target for FY 2011 is higher than the regional aggregate target to be consistent with the FY 2011
budget target.

SP-4b

Percent of the population served by community
water systems where risk to public health is
minimized through source water protection.

SG



57%

54%

93%

80%

58%

49%

65%

62%

20%

40%

12%

65%



62%



FY 2010 COMMITMENT





52.4%



95%

80%

58%

51%

64%

60%

20%

35%

12%

72%







FY 2009 END OF YEAR RESULT





54.0%



93.0%

80.0%

63.0%

51.0%

65.0%

63.0%

15.0%

37.0%

12.0%

82.0%







FY 2008 END OF YEAR RESULT





48%



95%

81%

57%

40%

64%

44%

16%

35%

12%

71%







FY 2010 UNIVERSE (in millions)





293.5



15.0

30.4

25.4

57.7

43.3

37.8

11.9

10.5

50.2

11.3







National Program Manager Comments

SP-4b is a new measure starting in FY 08. Note: "Minimized risk" is achieved by the substantial implementation, as determined by the state, of actions in a source water protection strategy. The universe is the
most recent SDWIS inventory of community water systems. FY 07 end-of-year adjusted data not from ACS.

SP-5

By 2015, in coordination with other federal
agencies, reduce by 50 percent the number of
homes on tribal land lacking access to safe
drinking water.

OMB PA
ARRA
I

8

(Long-
Term FY
2011
Target)

Indicator

























19,319



FY 2010 COMMITMENT





27,367
(8.58%)























27,367
(8.58%)





FY 2009 END OF YEAR RESULT





43,437























43,437





FY 2009 COMMITMENT





28,977 (9.0%)























28,977





FY 2008 END OF YEAR RESULT





34,855 (11%)























34,855





FY 2003 BASELINE





38,637























38,637





UNIVERSE





319,070























319,070





National Program Manager Comments

This measure involves coordination with other federal agencies. Measure is converted into an indicator for FY 2011 and supplemented by SDW-18.

SDW-18

Number of American Indian and Alaska Native
homes provided access to safe drinking water in
coordination with other federal agencies.

ARRA



100,700

























136,100



FY 2009 BASELINE





80,900





























UNIVERSE





360,000





























National Program Manager Comments

New measure for FY 2011, to supplement SP-5 in the NWPG and replace SP-5 in the new Strategic Plan.

SDW-la

Percent of community water systems (CWSs)
that have undergone a sanitary survey within
the past three years (five years for outstanding
performers) as required under the Interim
Enhanced and Long-Term I Surface Water
Treatment Rules.

OMB PA
BUD
SG

95%

95%

89%

90%

95%

91%

87%

91%

93%

87%

95%

70%

95%







FY 2010 COMMITMENT





88.6%



90%

95%

91%

87.7%

91%

93%

87%

95%

75%

66%





Page 2 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2009 END OF YEAR RESULT





88%



99.0%

95.0%

93.2%

87.0%

92.9%

92.0%

91.0%

90.0%

67.0%

80.0%







FY 2009 UNIVERSE





11,038

88%

479

1,019

1,215

1,750

1,356

2,109

780

808

936

586







National Program Manager Comments

* Prior to FY 07, this measure tracked states, rather than CWSs, in compliance with this regulation. The national FY 07 end-of-year result provided is an estimate.

SDW-lb

Number of tribal community water systems
(CWSs) that have undergone a sanitary survey
within the past three years (five years for
outstanding performers) as required under the
Interim Enhanced and Long-Term I Surface
Water Treatment Rule.

NPMStat



70

62

2

2

n/a

1

2

8

1

15

23

8







FY 2010 COMMITMENT





55

55

1

2

n/a

1

2

7

1

7

26

8







FY 2009 END OF YEAR RESULT





63



2

2

n/a

1

2

9

1

13

25

8







FY 2008 END OF YEAR RESULT





47



1

2

n/a

1

2

5

1

16

12

7







FY 2005 BASELINE





22



n/a

1

n/a

1

2

1

1

0

9

7







FY 2009 UNIVERSE





74



1

2

n/a

1

2

9

1

25

23

10







National Program Manager Comments

A sanitary survey is an on-site review of the water sources, facilities, equipment, operation, and maintenance of a public water system for the purpose of evaluating the adequacy of the facilities for producing and
distributing safe drinking water.

SDW-2

Percent of the data for violations of health-
based standards at public water systems that is
accurate and complete in SDWIS-FED for all
maximum contaminant level and treatment
technique rules (excluding the Lead and Copper
Rule).

OMB PA
I

LT 2011
OMB PA
Target:
90%

Indicator





























FY 2009 END OF YEAR RESULT





64.0%





























FY 2008 END OF YEAR RESULT





62%





























FY 2007 END OF YEAR RESULT





60%





























FY 2005 BASELINE





n/a





























UNIVERSE





n/a





























National Program Manager Comments

The FY 07 end-of-year result is based on audits conducted during 2005 and 2006. Future results will be based on three-year rolling data from data verification audits conducted during the past 3 calendar years.

SDW-
3

Percent of the lead action level data that for the
Lead and Copper Rule, for community water
systems serving over 3,300 people, that is
complete in SDWIS-FED.

I



Indicator





























FY 2005 2007 END OF YOUR RESULTS





87%



88%

97%

93%

85%

98%

83%

71%

89%

76%

90%







FY 2002 2004 END OF YEAR RESULTS





80%



89%

97%

86%

87%

83%

47%

68%

90%

88%

85%







FY 2005 BASELINE





n/a





























UNIVERSE





8,954



435

699

676

2,006

1,594

1,438

440

366

913

387







National Program Manager Comments

*This measure is calculated every three years to match the requirements for lead sampling. The 2008—2010 results will be calculated in April 2011.

SDW-4

Fund utilization rate [cumulative dollar amount
of loan agreements divided by cumulative funds
available for projects] for the Drinking Water
State Revolving Fund (DWSRF).

OMB PA
BUD
ARRA

89%

89%



89%
(87% base)

90%

87%
(86% base)

90%
(89% base)

80%
(80%
ARRA)

87%
(89% base)

95%
(94% base)

90%
(87% base)

85%

92%
(94% base)







FY 2010 COMMITMENT





85.7%



89%

90%

85%

89%

78%

85%

94%

89%

75%

94%







FY 2009 END OF YEAR RESULT





92%



94%

90%

95%

95%

79%

93%

99%

93%

83%

86%





Page 3 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY
2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2008 END OF YEAR RESULT





90%



97.2%

94%

91.5%

89.5%

81.8%

88.1%

102%

85.9%

85.7%

93%







FY 2005 BASELINE





84.7%



78.5%

93.0%

83.3%

88.0%

87.0%

64.5%

91.0%

84.0%

80.0%

94.3%







UNIVERSE (FY 2007 in millions)





$14,419.7



$1,378.1

$2,686.4

$832.3

$1,527.6

$2,812.2

$1,283.7

$978.8

$1,006.8

$1,321.7

$592.1







National Program Manager Comments

Universe represents the funds available for projects for the DWSRF through 2007, in millions of dollars (i.e., the denominator of the measure). FY 2011 targets include two numbers: 1) total with ARRA and 2) base
(in parenthesis), unless noted otherwise.

SDW-5

Number of Drinking Water State Revolving
Fund (DWSRF) projects that have initiated
operations, (cumulative)

OMB PA
BUD
ARRA

500
Annual

(200
ARRA)

5,726
(5,526 base)

5,231

624
(612 base)

410

486
(482 base)

615
(565 base)

1050
(900
ARRA)

235
(207 base)

542
(487 base)

490
(460 base)

330
(310 base)

500
(450 base)







FY 2010 COMMITMENT





4,424

4,424

500

405

440

530

935

182

462

450

280

240







FY 2009 END OF YEAR RESULT





4,576

4,576

564

396

464

564

936

160

427

479

225

361







FY 2008 END OF YEAR RESULT





4,082

4,082

465

383

418

522

847

135

380

418

207

307







FY 2005 BASELINE





2,611

2,611

320

311

261

369

557

59

229

242

123

140







National Program Manager Comments

This measure was annually reported in ACS starting in FY 2009. FY 2011 targets include two numbers: 1) total with ARRA and 2) base (in parenthesis), unless noted otherwise.

SDW-7a

Percent of deep injection wells that are used to
inject industrial, municipal, or hazardous waste
(Class I) that lose mechanical integrity and are
returned to compliance within 180 days thereby
reducing the potential to endanger underground
sources of drinking water.

OMB PA
BUD
SG

92%

92%

88%

n/a

n/a

n/a

90%

50%

93%

90%

95%

100%

75%







FY 2010 COMMITMENT





89%



n/a

n/a

n/a

90%

75%

93%

90%

95%

90%

75%







FY 2009 END OF YEAR RESULT





100%



n/a

n/a

n/a

100%

100%

100%

100%

100%

100%

100%







UNIVERSE





8



n/a

1

n/a

1

2

2

0

2

0

0







National Program Manager Comments

Measure revised for FY 09. FY 2009 EOY Result is the new baseline. Universe for FY 09 will be updated to reflect the forecasted number of mechanical integrity failures.

*The universe reflects FY 07 end-of-year and is subject to change in FY 08. The National target for FY 2011 is higher than the regional aggregate target to be consistent with the FY 2011 budget target.

SDW-7b

Percent of deep injection wells that are used to
enhance oil/natural gas recovery, or for the
injection of other (Class II) fluids associated
with oil and natural gas production, that have
lost mechanical integrity and are returned to
compliance within 180 days thereby reducing
the potential to endanger underground sources
of drinking water.

OMB PA
BUD
SG

89%

89%

86%

n/a

90%

75%

70%

60%

90%

85%

95%

90%

85%







FY 2010 COMMITMENT





85%



n/a

90%

45%

70%

57%

90%

85%

95%

90%

85%







FY 2009 END OF YEAR RESULT





90%



n/a

100%

57%

83%

67%

96%

85%

95%

100%

100%







UNIVERSE





2,816



n/a

1

30

52

269

1,086

310

159

896

13







National Program Manager Comments

Measure revised for FY 09. FY 2009 EOY Result is the new baseline. Universe for FY 09 will be updated to reflect the forecasted number of mechanical integrity failures.

*The universe reflects FY 07 end-of-year and is subject to change in FY 08. The National target for FY 2011 is higher than the regional aggregate target to be consistent with the FY 2011 budget target.

Page 4 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

SDW-7c

Percent of deep injection wells that are used for
salt solution mining (Class III) that lose
mechanical integrity and are returned to
compliance within 180 days thereby reducing
the potential to endanger underground sources
of drinking water.

OMB PA
BUD
SG

93%

93%

86%

n/a

95%

n/a

100%

50%

94%

85%

95%

90%

n/a







FY 2010 COMMITMENT





90%



n/a

95%

99%

100%

75%

94%

85%

95%

90%

n/a







FY 2009 END OF YEAR RESULT





100%



n/a

100%

100%

100%

100%

100%

100%

100%

100%

100%







UNIVERSE





7



n/a

0

n/a

0

2

0

0

4

1

n/a







National Program Manager Comments

Measure revised for FY 09. FY 2009 EO Y Result is the new baseline. Universe for FY 09 will be updated to reflect the forecasted number of mechanical integrity failures.

*The universe reflects FY 07 end-of-year and is subject to change in FY 08. The National target for FY 2011 is higher than the regional aggregate target to be consistent with the FY 2011 budget target.

SDW-8

Percent of high priority Class V wells identified
in sensitive ground water protection areas that
are closed or permitted, (cumulative)

[Measure will still set targets and commitments
and report results in both % and #. Numerical
commitments from UIC database.]

OMB PA
BUD

76%

76%



90%

86%

85%

70%

81%

86%

93%

85%

55%

70%







FY 2010 COMMITMENT





71%



90%

86%

85%

75%

75%

86%

93%

80%

43%

50%







FY 2009 END OF YEAR RESULT





82%



99.9%

97.0%

94.0%

65.0%

87.0%

100.0%

100.0%

89.0%

42.0%

71.0%







FY 2009 UNIVERSE





53,074



15,189

286

4,031

1,692

3,585

271

7,893

2,751

5,211

12,165







National Program Manager Comments

Measure revised for FY 09. FY 2009 EO Y Result is the new baseline.Universe for FY 09 will be updated for the revised measure. Note: Measure will still set target and commitment and report results in both
percent and number.

"Sensitive ground water protection areas" are defined by the UIC primacy program director, but at a minimum must include ground water based community water system source water areas. This measure does not
report all of the high priority wells that are being closed or permitted because some states do not distinguish between high priority wells in ground water based community water system source water areas and other
areas.

SDW-11

Percent of DWSRF projects awarded to small
PWS serving <500, 501-3,300, and 3,301-
10,000 consumers.

I



Indicator





























FY 2009 BASELINE





71%



72%

75%

70%

30%

68%

76%

80%

87%

81%

80%







UNIVERSE (Total number of projects)





623



138

44

56

43

126

33

70

87

26

75







National Program Manager Comments

New measure starting in FY 2011.

SDW-12

Percent of DWSRF dollars awarded to small
PWS serving <500, 501-3,300, 3,301-10,000
consumers.

I



Indicator





























FY 2009 BASELINE





40%



24%

38%

40%

16%

42%

36%

54%

52%

60%

79%







UNIVERSE (Millions)





1,420.5



127.7

251.5

137.2

176.9

246.6

211.7

105.7

108.0

55.2

101.8







National Program Manager Comments

New measure starting in FY 2011.

SDW-13

Percent of DWSRF loans that include
assistance to disadvantaged communities.

I



Indicator





























FY 2009 BASELINE





34%



22%

55%

43%

33%

20%

42%

27%

43%

23%

32%





Page 5 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



UNIVERSE

623 138

44

56

43

126

33

70

87

26

75





National Program Manager Comments

New measure starting in FY 2011.

SDW-14

Number and percent of PWS, including new
PWS, serving fewer than 500 persons. (New
PWS are those first reported to EPA in last
calendar year).

I



Indicator





























FY 2009 BASELINE (CWS & NTNCWS
<500)





40,289



3662

3647

4741

6061

7357

4949

2827

2659

4386

4384











64%



77%

65%

67%

56%

61%

52%

60%

69%

68%

78%







FY 2009 New Systems (CWS & NTNCWS)





511



51

59

62

89

94

45

30

51

30

30







UNIVERSE (CWS & NTNCWS)





70,347



4736

5577

7046

10774

12040

9567

4715

3863

6415

5614







National Program Manager Comments

New measure starting in FY 2011.

SDW-15

Number and percent of small PWS (<500, 501 -
3,300, 3,301-10,000) with repeat health based
Nitrate/Nitrite, Stage 1 D/DBP, SWTR and
TCR violations.

I



Indicator





























FY 2009 BASELINE (CWS and NTNCWS





1,732



164

208

113

218

102

394

288

91

154

172







<10,000 w/ repeat Health-Based Viols)





3%



4%

4%

2%

2%

1%

4%

6%

2%

3%

3%







UNIVERSE (CWS and NTNCWS <10,000)





66,165



4478

5189

6751

9840

11270

9082

4562

3690

5877

5426







National Program Manager Comments

New measure starting in FY 2011.



SDW-16

Average time for small PWS (<500, 501 -
3,300, 3,301-10,000) to return to compliance
with acute Nitrate/Nitrite, Stage 1 D/DBP,
SWTR and TCR health-based violations (based
on state-reported RTC determination date).

I



Indicator





























FY 2009 BASELINE (CWS and NTNCWS
<10,000 w/ Acute Health-Based Viols)





96



15

9

31

1

6

6

17

4

7

3











88



134

18

69

74

44

72

153

135

53

36







UNIVERSE (CWS and NTNCWS <10,000)





66,165



4478

5189

6751

9840

11270

9082

4562

3690

5877

5426







National Program Manager Comments

New measure starting in FY 2011.

SDW-17

Number and percent of schools and childcare
centers that meet all health-based drinking
water standards.

I



Indicator





























FY 2009 BASELINE





7,260



1057

705

1179

688

1933

329

197

224

523

425











94%



92%

95%

96%

95%

95%

95%

89%

94%

90%

97%







UNIVERSE





7,703



1146

740

1228

724

2041

345

222

239

578

440





Page 6 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

New measure starting in FY 2011.

Subobjective 2.1.2 Fish and Shellfish Safe to Eat



SP-6

Percent of women of childbearing age having
mercury levels in blood above the level of
concern.

BUD

4.9%

Defer for FY 2011























Defer for FY
2011

4.6%



FY 2010 COMMITMENT





5.1%























5.1%





FY 2009 END OF YEAR RESULT





data n/a























data n/a





FY 2008 END OF YEAR RESULT





data n/a























data n/a





FY 2005 BASELINE





5.7%























5.7%





National Program Manager Comments

SP-6 is a new measure starting in FY 08.

FS-la

Percent of river miles where fish tissue were
assessed to support waterbody-specific or
regional consumption advisories or a
determination that no consumption advice is
necessary. (Great Lakes measured separately;
Alaska not included) (Report every two years)

I



Indicator





























FY 2009 END OF YEAR RESULT





39%





























FY 200S END OF YEAR RESULT





26%(910,000)





























FY 2007 END OF YEAR RESULT





26%(910,000)





























FY 2005 BASELINE





24% (840,000)





























UNIVERSE





100%(3.5 million)





























National Program Manager Comments

*This is the actual FY 06 end-of-year result. An estimated FY 06 end-of-year result had been entered in ACS.

FS-lb

Percent of lake acres where fish tissue were
assessed to support waterbody-specific or
regional consumption advisories or a
determination that no consumption advice is
necessary. (Great Lakes measured separately;
Alaska not included) (Report every two years)

I



Indicator





























FY 2009 END OF YEAR RESULT





43%





























FY 2008 END OF YEAR RESULT





38%(15.2 million)





























FY 2007 END OF YEAR RESULT





38%(15.2 million)





























FY 2005 BASELINE





35%(14 million)





























UNIVERSE





100% (40 million)





























National Program Manager Comments

*This is the actual FY 06 end-of-year result. An estimated FY 06 end-of-year result had been entered in ACS.



Subobjective 2.1.3 Water Safe for Swimming



SP-9

Percent of days of the beach season that coastal
and Great Lakes beaches monitored by state
beach safety programs are open and safe for
swimming.

BUD
SG

95%

95%

91%

98%

95%

95%

92%

88%

80%

n/a

n/a

86%

95%



96%



FY 2010 COMMITMENT





95%



98%

95%

95%

92%

85%

85%

n/a

n/a

86%

95%







FY 2009 END OF YEAR RESULT





95%



n/a

98.0%

99.2%

96.8%

93.7%

82.0%

n/a

n/a

93.0%

98.0%







FY 2008 END OF YEAR RESULT





95%



98.6%

97.9%

98%

96.4%

91%

85%

n/a

n/a

93.3%

95.4%





Page 7 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2005 BASELINE





96.0%



98.0%

97.2%

98.5%

963%

95.5%

93.0%

n/a

n/a

95.3%

92.8%







UNIVERSE (2006)





709,170



89,355

105,772

19,357

180,965

52,559

14,266

n/a

n/a

233,000

13,896







National Program Manager Comments

Universe changes annually. Per ACS, Region 9's FY 07 commitment reflects the inclusion of Guam, American Samoa, and the Northern Marianas for the first time. These territories have a higher percentage of
beach season day closures resulting in a lower commitment at the regional and national levels.

Universe equals the total number of beach season days that beaches were open. The National target for FY 2011 is higher than the regional aggregate target to be consistent with the FY 2011 budget target.

SS-1

Number and national percent, using a constant
denominator, of Combined Sewer Overflow
(CSO) permits with a schedule incorporated
into an appropriate enforceable mechanism,
including a permit or enforcement order, with
specific dates and milestones, including a
completion date consistent with Agency
guidance, which requires: 1) Implementation of
a Long Term Control Plan (LTCP) which will
result in compliance with the technology and
water quality-based requirements of the Clean
Water Act; or 2) implementation of any other
acceptable CSO control measures consistent
with the 1994 CSO Control Policy; or 3)
completion of separation after the baseline date,
(cumulative)

NPMStat



717
(84%)

732

77

72

220

18

304

n/a

22

1

3

15







FY 2010 COMMITMENT





702 (82%)

702

76

70

211

17

290

n/a

19

1

3

15







FY 2009 END OF YEAR RESULT





693 (81%)

693

76

67

206

17

294

n/a

14

1

3

15







FY 200S END OF YEAR RESULT





610(72%)

610

76

62

197

15

232

n/a

9

1

3

15







FY 200S BASELINE





536(63%)



75(91%)

51(48%)

175(74%)

9(38%)

200(55%)

n/a

7(29%)

1(100%)

3(100%)

15(100%)







UNIVERSE





853



82

106

236

24

362

n/a

24

1

3

15







National Program Manager Comments

Measure revised for FY 08. FY 07 numbers are based on a slightly different definition.

Beginning in FY 08, OECA and OWM agreed on common language and data collection procedures to streamline this measure. While the definition is slightly different for OWM, the past data is still valid for
comparison with future data. We have included a revised baseline to demonstrate the real progress for FY 08. While national numbers are fairly stable, the Regional baselines did change.

SS-2

Percent of all Tier I (significant) public beaches
that are monitored and managed under the
BEACH Act program.

SG



100%

97%

100%

100%

100%

100%

100%

95%

n/a

n/a

85%

93%







FY 2010 COMMITMENT





99%

97%

100%

100%

100%

100%

100%

95%

n/a

n/a

85%

93%







FY 2009 END OF YEAR RESULT





97.6%



100%

100%

100%

100%

100%

100%

n/a

n/a

100%

81%







FY 200S END OF YEAR RESULT





99.1%



100%

100%

100%

100%

100%

100%

n/a

n/a

100%

93%







FY 2005 BASELINE





96.5%



100%

100%

100%

100%

100%

92%

n/a

n/a

100%

80%







UNIVERSE





2,690



905

365

89

481

320

79

n/a

n/a

376

75







National Program Manager Comments

States may change their designation of beaches at any time. Therefore, these numbers may change from year to year.
""Universe for FY 2008 Tier I beaches may be adjusted.

Subobjective 2.2.1 Improve Water Qualify on a Watershed Basis

Number of waterbodies identified in 2002 as
not attaining water quality standards where
standards are now fully attained (cumulative)

OMB PA
BUD
SG
SMM
ARRA

227

72

FY 2010 COMMITMENT

FY 2009 END OF YEAR RESULT

Page 8 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2008 END OF YEAR RESULT





2,165



84

87

358

418

528

144

226

222

45

53







UNIVERSE (2002)





39,503



6,710

1,805

8,998

5,274

4,550

1,407

2,036

1,274

1,041

6,408







National Program Manager Comments

FY 07 data from regional staff and is not reflected in ACS since this measure begins in 2008. FY 08 targets in the FY 09 Budget Congressional Justification and OMB PA are rounded to 1,550.

SP-10 differs from previous Measure L, since SP-10 uses an updated 2002 baseline. Note: 2000-2002 results equal 1,980 waters — not included above. The FY10 Planning Target is higher than the Regional

aggregrates because the planning target aligns with our target included in the FY11 President's budget.

SP-11

Remove the specific causes of waterbody
impairment identified by states in 2002.
(cumulative)

BUD

8,670

8,670

8,669

326

443

1,600

1,003

3205

410

341

470

419

452



9,200



FY 2010 COMMITMENT





8,512



257

391

1,575

1,003

3,205

410

332

470

419

450







FY 2009 END OF YEAR RESULT





7,530



224

384

1,403

912

2,666

395

324

465

310

447







FY 2008 END OF YEAR RESULT





6,723



217

243

1,232

912

2,665

346

240

465

303

100







UNIVERSE





69,677



8,826

2,567

13,958

9,374

10,155

3,005

4,391

3,502

2,742

11,157







National Program Manager Comments

FY 07 data from Regional staff and is not reflected in ACS since measure is new starting in FY 08.

SP-12

Improve water quality conditions in impaired
watersheds nationwide using the watershed
approach, (cumulative)

BUD

170

185

185

6

21

18

48

20

21

6

26

9

10



300



FY 2010 COMMITMENT





141



5

20

16

40

15

12

5

20

4

4







FY 2009 END OF YEAR RESULT





104



4

14

12

32

10

9

4

17

0

2







FY 2008 END OF YEAR RESULT





60



1

8

8

20

5

3

3

12

0

0







UNIVERSE





4,767



246

300

300

2,000

378

213

169

684

27

450







National Program Manager Comments

FY 07 data is from Regional staff and is not reflected in ACS since measure begins in FY 08.

SP-13

Ensure that the condition of the Nation's
wadeable streams does not degrade (i.e., there
is no statistically significant increase in the
percent of streams rated "poor" and no
statistically significant decrease in the streams
rated "good").





Deferred until 2012

























Maintain or
Improve the
Baseline



FY 2006 BASELINE





28% good; 25%
fair; 42% poor





























UNIVERSE



































National Program Manager Comments

The Wadeable Streams Survey will be updated in 2011. There will be no reporting on this measure until 2012.

SP-14

Improve water quality in Indian country at
monitoring stations in tribal waters (i.e., show
improvement in one or more of seven key
parameters: dissolved oxygen, pH, water
temperature, total nitrogen, total phosphorus,
pathogen indicators, and turbidity),
(cumulative)

OMB PA

Long-
Term
Target

Deferred until 2012

























75



UNIVERSE





1,661 (185)*



160(14)

14 (n/a)

n/a

37 (2)

729 (44)

68(1)

82 (4)

100(10)

203 (43)

268 (67)







National Program Manager Comments

There will be no reporting on this measure until 2012. ""Numbers in parentheses are the number of stations with suspected depressed water quality and restoration activities underway.
Note: EPA estimates that improvement is most attainable at 185 stations.

Page 9 of39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

SP-15

By 2015, in coordination with other federal
agencies, reduce by 50 percent the number of
homes on tribal lands lacking access to basic
sanitation, (cumulative)

ARRA
I



Indicator

























N/A
(Indicator)



FY 2010 COMMITMENT





18,985 (5.95%)























18,985
(5.95%)





FY 2009 END OF YEAR RESULT





28,052























28,052





FY 2008 END OF YEAR RESULT





data n/a























data/na





FY 2007 END OF YEAR RESULT





n/a























n/a





FY 2003 BASELINE





26,777























26,777





UNIVERSE





319,070





























National Program Manager Comments

This measure involves coordination with other federal agencies. Measure is converted into an indicator for FY 2011 and supplemented by WQ-24.

WQ-la

Number of numeric water quality standards for
total nitrogen and for total phosphorus adopted
by States and Territories and approved by EPA,
or promulgated by EPA, for all waters within
the State or Territory for each of the following
waterbody types: lakes/reservoirs,
rivers/streams, and estuaries (cumulative, out of
a universe of 280)

SG



47

47

1

7

8

6

2

0

1

0

22

0







FY 2010 COMMITMENT





13



3

0

1

1

1

1

2

0

4

0







FY 2009 END OF YEAR RESULT





11



3

0

1

1

1

1

0

0

4

0







FY 2008 END OF YEAR RESULT





8



0

0

1

1

1

1

0

0

4

0







FY 2010 BASELINE





31



3

5

0

0

1

0

0

0

22

0







UNIVERSE





280



34

20

34

44

24

24

16

24

38

22







National Program Manager Comments

Measure revised in FY 2011. If a state or territory has adopted nutrient water quality standards for some, but not all of its applicable waters, it may be counted in both WQ-1 a and WQ-1 b.

WQ-lb

Number of numeric water quality standards for
total nitrogen and total phosphorus at least
proposed by States and Territories, or by EPA
proposed rulemaking, for all waters within the
State or Territory for each of the following
waterbody types: lakes/reservoirs,
rivers/streams, and estuaries (cumulative, out of
a universe of 280).

SG



58

58

3

7

9

8

4

0

3

0

24

0







FY 2010 COMMITMENT





32



3

4

2

6

5

5

1

3

3

0







FY 2009 END OF YEAR RESULT





32



3

4

2

6

5

5

1

3

3

0







FY 2008 END OF YEAR RESULT





35



3

3

3

6

6

5

3

4

1

1







FY 2010 BASELINE





31



3

5

0

0

1

0

0

0

22

0







UNIVERSE





280



34

20

34

44

24

24

16

24

38

22







National Program Manager Comments

Measure revised in FY 2011. If a state or territory has adopted nutrient water quality standards for some, but not all of its applicable waters, it may be counted in both WQ-1 a and WQ-1 b.

Page 10 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

WQ-lc

Number of States and Territories supplying a
full set of performance milestone information to
EPA concerning development, proposal, and
adoption of numeric water quality standards for
total nitrogen and total phosphorus for each
waterbody type within the State or Territory
(annual). (The universe for this measure is 56.)

SG
proposed



19

19

0

0

4

6

1

0

4

0

4

0







FY 2010 BASELINE





3



0

0

0

0

0

0

0

0

3

0







UNIVERSE





56



6

4

6

8

6

5

4

6

7

4







National Program Manager Comments

New measure for FY 2011.























WQ-2

Number of Tribes that have water quality
standards approved by EPA. (cumulative)





39

39

n/a

1

n/a

2

5

10

n/a

3

8

10







FY 2010 COMMITMENT





38



n/a

1

n/a

2

4

10

n/a

3

8

10







FY 2009 END OF YEAR RESULT





35



n/a

1

n/a

2

3

10

n/a

2

7

10







FY 2008 END OF YEAR RESULT





35



n/a

1

n/a

2

3

10

n/a

2

7

10







FY 2005 BASELINE





26



0

0

n/a

2

2

9

0

2

3

8







UNIVERSE





55



n/a

1

n/a

2

5

11

n/a

6

16

14







National Program Manager Comments

The universe reflects all federally recognized Tribes who have applied for "treatment in the same manner as a state" (TAS) to administer the water quality standards program (as of September 2007).

WQ-3a

Number, and national percent, of States and
Territories that within the preceding three year
period, submitted new or revised water quality
criteria acceptable to EPA that reflect new
scientific information from EPA or other
resources not considered in the previous
standards.

OMB PA
BUD
SG

64.3%

36
(64.3%)

37

1

3

3

8

5

4

4

4

3

2







FY 2010 COMMITMENT





37 (66%)

37

2

3

3

8

5

4

3

4

3

2







FY 2009 END OF YEAR RESULT





35



3

2

3

6

4

4

3

6

3

1







FY 2008 END OF YEAR RESULT





35 (62.5%)



3

2

4

5

4

5

2

5

3

2







FY 2005 BASELINE





38(68%)



4

1

4

7

5

4

2

4

4

3







UNIVERSE





56



6

4

6

8

6

5

4

6

7

4







National Program Manager Comments

*FY 05 and 06 end-of-year results are from the WAT A database.

WQ-3b

Number, and national percent of Tribes that
within the preceding three year period,
submitted new or revised water quality criteria
acceptable to EPA that reflect new scientific
information from EPA or other resources not
considered in the previous standards.





13

(37%)

13

n/a

1

n/a

2

2

1

n/a

1

4

2







FY 2010 COMMITMENT





16(46%)

16

n/a

1

n/a

2

2

3

n/a

1

5

2







FY 2009 END OF YEAR RESULT





17

17

n/a

1

n/a

2

3

2

n/a

2

4

3







FY 2008 END OF YEAR RESULT





19(61%)



n/a

1

n/a

2

1

5

n/a

2

4

4







FY 2005 BASELINE





12(40%)



n/a

n/a

n/a

1

1

5

0

2

0

3







UNIVERSE (FY08)





35



0

1

n/a

2

3

10

0

2

8

9







National Program Manager Comments

FY 08 universe for WQ-3b is the number of authorized tribes that have at least initial EPA approved water quality standards

as of September 2007.







Page 11 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

WQ-4a

Percentage of submissions of new or revised
water quality standards from States and
Territories that are approved by EPA.

OMB PA
BUD
SMM
NPMStat

85%

85%

74%

75%

85%

90%

87%

75%

75%

50%

79%

75%

50%







FY 2010 COMMITMENT





85%

73.4%

75%

85%

78%

87%

80%

75%

50%

79%

75%

50%







FY 2009 END OF YEAR RESULT





93.2%



75.0%

100.0%

83.0%

100.0%

100.0%

91.7%

55.0%

96.7%

97.0%

50.0%







FY 2008 END OF YEAR RESULT





92.5%



100%

96%

100%

88.6%

100%

85%

99%

90%

100%

33%







FY 2005 BASELINE



































UNIVERSE (FY 08)





52



1

1

3

10

10

16

2

3

6

0







National Program Manager Comments

Based on submissions received in the 12 month period ending April 30 of the fiscal year. Partial approvals receive fractional credit. **FY 06 end-of-year data is from the WAT A database. Universe changes
annually based on number of water quality standards submissions.

WQ-5

Number of States and Territories that have
adopted and are implementing their monitoring
strategies in keeping with established schedules.

SG



56

56

6

4

6

8

6

5

4

6

7

4







FY 2010 COMMITMENT





56

56

6

4

6

8

6

5

4

6

7

4







FY 2009 END OF YEAR RESULT





56



6

4

6

8

6

5

4

6

7

4







FY 2008 END OF YEAR RESULT





53



6

4

6

8

6

5

4

3

7

4







FY 2005 BASELINE





51



6

3

6

6

6

3

4

6

7

4







UNIVERSE





56



6

4

6

8

6

5

4

6

7

4







National Program Manager Comments

"In keeping with established schedules" means that states include in their annual Section 106 Monitoring Initiative workplans specific actions that are intended to implement their monitoring strategies and that states
demonstrate that they are making a good faith effort to do these activities.

WQ-6a

Number of Tribes that currently receive funding
under Section 106 of the Clean Water Act that
have developed and begun implementing
monitoring strategies that are appropriate to
their water quality program consistent with
EPA Guidance, (cumulative)





170

177

6

1

n/a

2

32

20

4

15

60

37







FY 2010 COMMITMENT





158

158

6

1

n/a

2

29

14

4

15

50

37







FY 2009 END OF YEAR RESULT





134



6

0

n/a

1

29

14

2

19

30

33







FY 2008 END OF YEAR RESULT





101



6

0

n/a

1

24

14

2

4

18

32







FY 2005 BASELINE





0



0

0

0

0

0

0

0

0

0

0







UNIVERSE





242



6

1

n/a

5

32

40

5

23

93

37







National Program Manager Comments

A cumulative measure that counts tribes that have developed, submitted to the Region, and begun implementing water monitoring strategies that are consistent with the EPA 106 Tribal Guidance.

WQ-6b

Number of Tribes that are providing water
quality data in a format accessible for storage in
EPA's data system, (cumulative)





110

139

6

1

n/a

2

29

15

3

16

45

22







FY 2010 COMMITMENT





94

94

1

1

n/a

2

21

7

2

16

30

14







FY 2009 END OF YEAR RESULT





86



1

1

n/a

1

20

7

1

21

20

14







FY 2008 END OF YEAR RESULT





60



1

0

n/a

1

18

7

1

15

10

7







FY 2005 BASELINE





3



0

0

n/a

0

0

2

0

1

0

0







UNIVERSE





242



6

1

n/a

5

32

40

5

23

93

37







National Program Manager Comments

A cumulative measure that counts tribes that are providing surface water data electronically in a format that is compatible with the STORET/WQX system.

Page 12 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

WQ-7

Number of States and Territories that provide
electronic information using the Assessment
Database version 2 or later (or compatible
system) and geo-reference the information to
facilitate the integrated reporting of assessment
data, (cumulative)





45

45

6

4

6

6

6

3

2

6

4

2







FY 2010 COMMITMENT





45

45

6

4

6

6

6

3

2

6

4

2







FY 2009 END OF YEAR RESULT





44



6

4

4

7

6

3

2

6

4

2







FY 2008 END OF YEAR RESULT





42



5

4

5

7

5

3

1

6

4

2







UNIVERSE





56



6

4

6

8

6

5

4

6

7

4







National Program Manager Comments

Universe is fifty states and six territories, including the District of Columbia

WQ-8a

Number, and national percent, of TMDLs that
are established or approved by EPA [Total
TMDLs] on a schedule consistent with national
policy.

Note: A TMDL is a technical plan for reducing
pollutants in order to attain water quality
standards. The terms 'approved' and
'established' refer to the completion and
approval of the TMDL itself.

OMB PA
BUD
SMM
NPMStat

47,100

2,284
(72%)

2,267

205

40

585

337

325

192

108

185

50

240







FY 2010 COMMITMENT





2,592 (77%)

2,592

245

100

797

290

325

222

108

185

50

270







FY 2009 END OF YEAR RESULT





5,887 (162%)

5,887

340

126

3,413

675

530

186

49

178

80

310







FY 2008 END OF YEAR RESULT





9,135 (105%)

9,135

5,454

125

912

835

878

170

185

168

96

312







National Program Manager Comments

A TMDL is a technical plan for reducing pollutants in order to attain water quality standards. The terms 'approved' and 'established' refer to the completion and approval of the TMDL itself. Annual pace is the
number of TMDLs needed to be established consistent with national policy, i.e. generally within 13 years of listing of the water as impaired. * Cumulative total commitment numbers are calculated at about 80% of
pace for OMB PA. (Source: Office of Management and Budget, "Detailed Information on the Surface Water Protection Assessment," available at

http://www.whitehouse.gOv/omb/expectmore/detail/l 0004380.2005.html). Annual total numbers are memorialized and static whereas cumulative total OMB PA numbers are open to semi-annual updates.

Our FY 2011 targets are still draft numbers and do not represent final targets. Projecting state TMDL production numbers several months in advance continues to be a challenge when Regions have not yet engaged
the states in planning for 2011. We expect that the regions will work with states this summer to develop and finalize appropriate FY11 targets. Note that we may encounter challenges in setting the final FY11 targets
as states have suffered staff cutbacks and/or need to focus their efforts solely on consent decree TMDLs. We do recognize the importance of achieving
the target if at all possible and will work with Regional program staff to negotiate targets that come as close as possible to meeting the national goal.

WQ-8b

Number, and national percent, of approved
TMDLs, that are established by States and
approved by EPA [State TMDLs] on a schedule
consistent with national policy.

Note: A TMDL is a technical plan for reducing
pollutants in order to attain water quality
standards. The terms 'approved' and
'established' refer to the completion and
approval of the TMDL itself.

OMB PA
BUD
SG

41,611

2,023
(64%)

1,925

205

40

397

252

325

177

84

185

25

235







FY 2010 COMMITMENT





2,491 (76%)

2,491

245

100

794

270

325

198

84

185

25

265







FY 2009 END OF YEAR RESULT





5,829(162%)

5,829

340

126

3,413

661

530

146

49

178

76

310







FY 2008 END OF YEAR RESULT





8,973 (105%)

8,973

5,454

125

911

783

878

66

185

168

92

311





Page 13 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

A TMDL is a technical plan for reducing pollutants in order to attain water quality standards. The terms 'approved' and 'established refer to the completion and approval of the TMDL itself. Annual pace is the
number of TMDLs needed to be established consistent with national policy, i.e. generally within 13 years of listing of the water as impaired. * Cumulative total commitment numbers are calculated at about 80% of
pace for OMB PA. (Source: Office of Management and Budget, "Detailed Information on the Surface Water Protection Assessment," available at

http://www.whitehouse.gOv/omb/expectmore/detail/l 0004379.2005.html). Annual total numbers are memorialized and static whereas cumulative total OMB PA numbers are open to semi-annual updates.

Our FY 2011 targets are still draft numbers and do not represent final targets. Projecting state TMDL production numbers several months in advance continues to be a challenge when Regions have not yet engaged
the states in planning for 2011. We expect that the regions will work with states this summer to develop and finalize appropriate FY11 targets. Note that we may encounter challenges in setting the final FY11 targets
as states have suffered staff cutbacks and/or need to focus their efforts solely on consent decree TMDLs. We do recognize the importance of achieving
the target if at all possible and will work with Regional program staff to negotiate targets that come as close as possible to meeting the national goal.

WQ-9a

Estimated annual reduction in million pounds
of nitrogen from nonpoint sources to
waterbodies (Section 319 funded projects only).

OMB PA
BUD

8.5 million

8.5 million























8.5 million





FY 2010 COMMITMENT





8,500,000























8,500,000





FY 2009 END OF YEAR RESULT





9,100,000























9,100,000





FY 2008 END OF YEAR RESULT





11,300,000























11,300,000





FY 2005 BASELINE





3.7 million lbs





























National Program Manager Comments

FY 05 baseline for a 6 month period only. Starting with FY 06, a full year of data reported. End-of-Year results are received mid-February of the following year.

WQ-9b

Estimated annual reduction in million pounds
of phosphorus from nonpoint sources to
waterbodies (Section 319 funded projects only).

OMB PA
BUD

4.5 million

4.5 million























4.5 million





FY 2010 COMMITMENT





4,500,000























4,500,000





FY 2009 END OF YEAR RESULT





3,500,000























3,500,000





FY 2009 COMMITMENT





4,500,000























4,500,000





FY 2008 END OF YEAR RESULT





3,500,000























3,500,000





FY 2005 BASELINE





558,000 lbs





























National Program Manager Comments

FY 05 baseline for a 6 month period only. Starting with FY 06, a full year of data reported. End-of-Year results are received mid-February of the following year.

WQ-9c

Estimated annual reduction in million tons of
sediment from nonpoint sources to waterbodies
(Section 319 funded projects only).

OMB PA
BUD

700,000

700,000























700,000





FY 2010 COMMITMENT





700,000























700,000





FY 2009 END OF YEAR RESULT





2,300,000























2,300,000





FY 2008 END OF YEAR RESULT





2,100,000























2,100,000





FY 2005 BASELINE





1.68 million tons





























National Program Manager Comments

FY 05 baseline for a 6 month period only. Starting with FY 06, a full year of data reported. End-of-Year results are received mid-February of the following year.

WQ-10

Number of waterbodies identified by States (in
1998/2000 or subsequent years) as being
primarily nonpoint source (NPS)-impaired that
are partially or fully restored, (cumulative)

OMB PA

SG
NPMStat

Long-
Term

250

222

24

13

22

44

27

19

24

22

8

19







FY 2010 COMMITMENT





188

188

19

10

19

50

22

12

20

16

5

15







FY 2009 END OF YEAR RESULT





147



16

6

16

36

18

11

16

13

3

12







FY 2008 END OF YEAR RESULT





97



13

6

9

24

11

8

14

6

2

4







FY 2005 BASELINE





15



1

0

2

5

3

0

4

0

0

0





Page 14 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

Regions report results. The universe is the estimated waterbodies impaired primarily by nonpoint sources from the 1998 (or 2000 if states did not have a 1998 list) 303(d) lists. Note that this universe shifts each
time a new 303(d) list is developed, so this figure is only an estimate. Only waters on the Success Story website (http://www.epa.gov/owow/nps/Success319/) are counted. Regional FY 06 end-of-year results not
from ACS. Only a national FY 06 end-of-year result shown in ACS. Indicator measure in FY 06.

WQ -
11

Number, and national percent, of follow-up
actions that are completed by assessed NPDES
(National Pollutant Discharge Elimination
System) programs, (cumulative)

I



Indicator





























FY 2009 END OF YEAR RESULT





229

229

26

18

22

23

40

17

18

27

15

23







FY 2008 END OF YEAR RESULT





216(100%)

216

26

18

21

23

34

15

18

26

13

22







FY 2007 END OF YEAR RESULT





62.0%



22

16

17

20

28

10

16

23

13

19







FY 2005 BASELINE





18.0%



6

5

4

9

16

2

6

3

1

2







UNIVERSE





100.0%



36

27

32

41

66

23

47

39

21

36







National Program Manager Comments

Regional annual commitments and action items are confirmed by HQ action item database. Assessed programs include 45 authorized states, 5 unauthorized states (MA, NH, NM, AK, ID), 1 authorized territory
(VI), 3 authorized territories (DC, PR, Pacific Island Territories), and 10 Regions (total of 64 programs) assessed through the Permits for Environmental Results (PER) program.

Universe of 298 includes all follow-up actions for which a schedule was established. The universe increases as additional action items are identified by the Regions and through HQ program review. An updated
universe will be available in March 2009.

WQ-12a

Percent of non- Tribal facilities covered by
NPDES permits that are considered current.
[Measure will still set targets and commitments
and report results in both % and #.]





89%

88.9%

80%

87%

89%

85%

89%

94%

94%

85%

75%

80%











106,052

106,426

1,430

2,721

16,526

15,908

15,813

24,569

16,928

5,061

1,895

5,575







FY 2010 COMMITMENT





89%



76%

87%

89%

90%

90%

94%

90%

85%

79%

80%











104,623

104,623

1,423

2,742

16,423

17,237

13,334

25,143

15,935

4,841

1,909

5,636







FY 2009 END OF YEAR RESULT





90% (102,196)



81.0%

89.0%

89.0%

91.0%

88.0%

97.0%

90.0%

83.0%

84.0%

83.0%







FY 2008 END OF YEAR RESULT





90% (105,089)



(73.5%)
1,165

(90%)
2,885

(86.9%)
15,710

(90.1%)
17,431

(85.5%)
12,660

(97.7%)
26,288

(91%)
16,384

(88%)
4,879

(88.6%)
2,407

(81.3%)
5,280







FY 2005 BASELINE





87.8% (96,851)



64%

94%

86%

87%

87%

93%

82%

87%

91%

77%







UNIVERSE





119,733



1,787

3,128

18,569

18,715

17,939

26,137

18,009

5,954

2,526

6,969







National Program Manager Comments

Targets, commitments, and results will be reported in both percent and number. This measure includes facilities covered by all permits, including State and EPA issued permits. Due to the shifting universe of
permitees, its is important to focus on the national percent. *FY 05 data not from ACS. Universe for WQ-12a is based on FY 2010 Commitments.

WQ-12b

Percent of tribal facilities covered by NPDES
permits that are considered current.

[Measure will still set targets and commitments
and report results in both % and #.]





88%

86.5%

100%

100%

n/a

100%

95%

90%

94%

92%

80%

64%













338

334

2

2

n/a

12

42

12

16

176

40

32







FY 2010 COMMITMENT





86%

86%

100%

100%

n/a

100%

95%

90%

100%

90%

79%

64%











333

333

2

2

n/a

12

40

12

16

176

40

33







FY 2009 END OF YEAR RESULT





83% (321)



100%

100%

n/a

92%

100%

92%

100%

91%

76%

46%







FY 2009 COMMITMENT





88%
(340/388)



100%
(2/2)

100%
(2/2)

n/a

100%
(13/13)

95%
(42/43)

90%
(9/10)

100%
(16/16)

95%
(188/198)

73%
(36/49)

61%
(34/56)







FY 2008 END OF YEAR RESULT





85% (329)



(100%) 2

(100%) 2

n/a

(100%) 13

(100%) 42

(100%) 10

(100%) 16

(95%) 189

(79%) 38

(30%) 17







FY 2005 BASELINE





80% (261)



0

2

n/a

16

37

8

1

140

41

16







UNIVERSE





386



2

2

n/a

12

44

13

16

196

51

50







National Program Manager Comments

Targets, commitments, and results will be reported in both percent and number. This measure includes facilities covered by all permits, including State and EPA issued permits. Due to the shifting universe of
permitees, its is important to focus on the national percent. (WQ-12b) FY 07 Region 8 commitment adjusted due to counting error. Universe for WQ-12b is based on FY2010 Commitments.

Page 15 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

WQ-13a

Number, and national percent, of MS-4s
covered under either an individual or general
permit.

I



Indicator





























FY 2009 END OF YEAR RESULT





6,541

6,541

517

1227

1016

503

1813

526

284

250

179

226







FY 2008 END OF YEAR RESULT





7,080

7,080

517

1101

964

758

1813

161

257

384

584

541







UNIVERSE





Indicator





























National Program Manager Comments

Data did not exist prior to 2007 for WQ-13 a & b.



WQ-13b

Number of facilities covered under either an
individual or general industrial storm water
permit.

I



Indicator





























FY 2009 END OF YEAR RESULT





81,660

81,660

3,548

4,605

6,500

18,477

20,508

13,508

7,068

4,198

766

2,482







FY 2008 END OF YEAR RESULT





89,530

89,530

1,654

5,160

6,436

18,323

20,508

11,940

6,623

4,372

11,273

3,241







UNIVERSE





100%





























National Program Manager Comments

Data did not exist prior to 2007 for WQ-13 a & b.

WQ-13c

Number of sites covered under either an
individual or general construction storm water
site permit.

I



Indicator





























FY 2009 END OF YEAR RESULT





200,732

200,732

7,704

17,671

19,317

75,311

7,738

17,403

12,480

12,444

24,069

6,595







FY 2008 END OF YEAR RESULT





204,341

204,341

4,321

9,742

23,799

75,317

9,879

16,308

18,210

12,051

27,409

7,305







FY 2005 BASELINE





n/a





























UNIVERSE





n/a





























National Program Manager Comments

Data did not exist prior to 2007 for WQ-13c.

WQ-13d

Number of facilities covered under either an
individual or general CAFO permit.

I



Indicator





























FY 2009 END OF YEAR RESULT





7,900

7,900

6

602

277

1,021

2,129

890

1,443

618

203

711







FY 2008 END OF YEAR RESULT





7,830

7,830

2

609

269

966

2,024

895

1,438

581

222

824







FY 2005 BASELINE





8,623



0

624

175

2,131

1,488

1,391

1,239

448

296

831







UNIVERSE





18,972



33

632

770

3,621

2,523

4,190

3,777

841

1,670

915







National Program Manager Comments

*FY 05 CAFO data is not from ACS Note: It is likely the Regions overestimated the number of CAFOs covered by a general permit in 2005.

WQ-14a

Number, and national percent, of Significant
Industrial Users (SIUs) that are discharging to
POTWs with Pretreatment Programs that have
control mechanisms in place that implement
applicable pretreatment standards and
requirements.

SG



21,458

21,417

1,314

1,639

1,733

3,460

4,964

1,990

995

647

4,088

587









99%

99.6%



























FY 2010 COMMITMENT





21,298 (98%)

21,298

1,314

1,850

1,699

3,619

4,540

1,976

989

647

4,088

576







FY 2009 END OF YEAR RESULT





21,264 (99%)

21,264

1,314

1,756

1,728

3,601

4,540

1,997

1,006

658

4,088

576







FY 2008 END OF YEAR RESULT





21,830 (99%)



1,367

2,101

1,685

3,619

4,721

2,081

1,003

647

4,088

576







FY 2005 BASELINE





22,226 (97.8%)



1,589

1,882

1,790

3,932

4,899

2,132

829

592

4,019

562







UNIVERSE





21,710



1,397

1,665

1,734

3,460

4,976

2,010

1,009

658

4,214

587







National Program Manager Comments

All universe numbers are approximate as they shift from year to year.

Page 16 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

WQ-14b

Number, and national percent, of Categorical
Industrial Users (CIUs) that are discharging to
POTWs without Pretreatment Programs that
have control mechanisms in place that
implement applicable pretreatment standards
and requirements.

I



Indicator





























FY 2009 END OF YEAR RESULT





1,315

1,315

45

72

68

299

542

124

81

36

6

42







FY 2008 END OF YEAR RESULT





1,363

1,363

44

68

67

316

580

120

84

36

6

42







FY 2005 BASELINE





91.2%

1,015

44

117

74

31

458

17

31

45

0

198







UNIVERSE





100%

1,602

45

72

75

321

630

120

243

42

6

48







National Program Manager Comments

All universe numbers are approximate as they shift from year to year.

WQ-15a

Percent of major dischargers in Significant
Noncompliance (SNC) at any time during the
fiscal year.

OMB PA
BUD
SG

22.5%

<15%























<15%





FY 2010 COMMITMENT





<22.5%























<22.5%





FY 2009 END OF YEAR RESULT





n/a



n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a







FY 2008 END OF YEAR RESULT





23.9%



39.8%

29.3%

18.4%

25.9%

19.1%

23.3%

34.4%

10.5%

19.8%

14.1%

23.9%





FY 2005 BASELINE





19.7%



25.0%

28.7%

15.0%

20.7%

17.7%

23.7%

17.7%

8.0%

13.7%

15.3%







UNIVERSE (FY 06)





6,643



426

582

757

1,345

1,167

1,087

396

260

347

276







National Program Manager Comments

HQ reports results by Region. FY 08 commitment for WQ-15a of <22.5% is a 3 yr. average that shows overall trends.

WQ-15b

Percent of major dischargers in Significant
Noncompliance (SNC) at any time during the
fiscal year, and of those, the number, and
national percent, discharging pollutant(s) of
concern on impaired waters.

I



Indicator





























FY 2009 END OF YEAR RESULT





n/a





























FY 2005 BASELINE





TBD





























UNIVERSE





1,735 (1,041)

1,735

155

67

256

147

773

189

81

43

12

12





WQ-16

Number, and national percent, of all major
publicly-owned treatment works (POTWs) that
comply with their permitted wastewater
discharge standards, (i.e. POTWs that are not in
significant non-compliance)

OMB PA
BUD
ARRA

86%

86%























86%





FY 2010 COMMITMENT





4,256 (86%)























4,256 (86%)





FY 2009 END OF YEAR RESULT





n/a























n/a





FY 2008 END OF YEAR RESULT





3,645 (86%)























3,645 (86%)





FY 2005 BASELINE





3,670























3,670





UNIVERSE





4,238























4,238





National Program Manager Comments

*FY 06 end-of-year data not from ACS.

WQ-17

Fund utilization rate [cumulative loan
agreement dollars to the cumulative funds
available for projects] for the Clean Water State
Revolving Fund (CWSRF).

OMB PA
BUD
ARRA

94%

94.5%



94%
(90% base)

90%
ARRA

92%
(92% base)

96%
(base 95%)

95%
(95%
ARRA)

94%
ARRA

92%
ARRA

95%
ARRA

94%

95%
(90% base)







FY 2010 COMMITMENT





94.5%



94%

90%

92%

95%

92%

91%

92%

94.5%

93%

95%







FY 2009 END OF YEAR RESULT





98%



102%

90%

92%

102%

98%

94%

n/a

93%

109%

104%





Page 17 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2008 END OF YEAR RESULT





98%



107%

95%

94%

103%

96%

95%

93%

95%

103%

103%







FY 2005 BASELINE





94.7%



110%

94%

89%

95%

98%

91%

88%

91%

93%

98%







UNIVERSE (in billions)





$75.2



$7.5

$15.1

$6.5

$8.7

$15.8

$7.1

$4.0

$2.3

$6.0

$2.2







National Program Manager Comments

""Universe represents the funds available for projects for the CWSRF through 2007, in billions of dollars (i.e., the denominator of the measure). FY 2011 targets include two numbers: 1) total with ARRA and 2)
base (in parenthesis), unless noted otherwise.

WQ-19a

Number of high priority state NPDES permits
that are issued in the fiscal year.

FY 2010 COMMITMENT

OMB PA
BUD
SG
SMM
NPMStat

95%

700

568

7

30

130

72

90

47

119

50

15

8











710

709

12

30

142

120

110

51

119

62

22

41







FY 2009 END OF YEAR RESULT





1,026

1,026

16

42

125

253

204

122

164

56

36

8







FY 2008 END OF YEAR RESULT





930 (120%)

930

16

40

168

198

252

84

104

47

17

4







FY 2005 BASELINE





601 (104%)

601

9

22

21

91

265

125

32

22

3

11







UNIVERSE





709



12

30

142

120

110

51

119

62

22

41







National Program Manager Comments

In FY 2010, the measure will be revised to provide a universe of priority permits in time for the setting of national and regional commitments in September 2009, consistent with the Agency target and commitment
schedule. Regions will commit to issue a certain number of permits from the fixed universe of priority permits in FY 2010. The national target will be the sum of all Regional commitments. There will be no
percentage goal for this measure. The universe of priority permits will be updated annually.

HQ reports results by Region. WQ-19a conforms to 106 OMB PA measure. FY 2006 measure, formed prior to OMB PA, reported in 2 parts (non-tribal and tribal). FY 2006 results: 98.5% (non-tribal) & 63.2%
(tribal). FY 2007 measure reported in 3 parts (State issued, EPA non-tribal, and EPA tribal permits). *FY 2007 Regional commitments & results are not from ACS. **FY08 measure was reported as State Issue
(WQ-19a) and EPA issued (WQ-19b) priority permits. Starting in FY 2008, the universe of priority permits candidates is expanded to capture a larger universe of environmentally significant permits.

WQ-19b

Number of high priority state and EPA
(including tribal) NPDES permits that are
issued in the fiscal year.

BUD

95%

800

650

13

39

132

73

90

48

120

50

18

67







FY 2010 COMMITMENT





792

792

35

39

145

120

110

57

120

62

37

67







FY 2009 END OF YEAR RESULT





1,118

1,118

36

54

130

253

204

132

165

58

48

38







FY 2008 END OF YEAR RESULT





61 (109%)

313

9

14

1

1

255

3

0

3

1

26







FY 2005 BASELINE





59 (104%)

324

16

9

0

0

265

1

8

6

0

19







UNIVERSE





792



35

39

145

120

110

57

120

62

37

67







National Program Manager Comments

In FY 2010, the measure will be revised to provide a universe of priority permits in time for the setting of national and regional commitments in September 2009, consistent with the Agency target and commitment
schedule. Regions will commit to issue a certain number of permits from the fixed universe of priority permits in FY 2010. The national target will be the sum of all Regional commitments. There will be no
percentage goal for this measure. The universe of priority permits will be updated annually. HQ reports results by Region. WQ-19a conforms to Surface Water Protection OMB PA measure. FY 2006 measure,
formed prior to OMB PA, reported in 2 parts (non-tribal and tribal). FY 2006 results: 98.5% (non-tribal) & 63.2% (tribal). FY 2007 measure reported in 3 parts (State issued, EPA non-tribal, and EPA tribal
permits). *FY 2007 Regional commitments & results are not from ACS. **FY08 measure was reported as State Issue (WQ-19a) and EPA issued (WQ-19b) priority permits. Starting in FY 2008, the universe of
priority permits candidates is expanded to capture a larger universe of environmentally significant permits. Starting in FY 2009, WQ-19b will measure the sum of all priority permits (State issued and EPA issued inc]

WQ-20

Number of facilities that have traded at least
once plus all facilities covered by an overlay
permit that incorporates trading provisions with
an enforceable cap.

I



Indicator





























FY 2009 END OF YEAR RESULT





406

407

80

25

165

30

22

1

0

0

61

23







FY 2008 END OF YEAR RESULT





368

368

80

1

152

30

22

1

0

3

60

19







FY 2007 END OF YEAR RESULT





127**

127

80

1

1

30

7

1

0

2

4

1







FY 2005 BASELINE





98**

98

79

0

1

8

3

0

0

0

6

1







UNIVERSE (FY 07)





365



80

25

127

30

87

1

0

2

8

5





Page 18 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

Note: WQ-20 was a two part measure in FY 07; (a) was a Target measure until early FY 07, and has subsequently been dropped. Universe is the number of dischargers covered under anNPDES permit that allows
trading. In FY 07, measure was: "Number of permits providing for trading... .and the number of dischargers that carried out trades." ***FY 07 end-of-year results are based on the number of dischargers that
carried out trades and are not from ACS.

*The trading measure counts all point source permitted facilities that have traded at least once using either individual or general permits that allow trading. Facilities covered under an overlay permit (sometimes
called an 'aggregate,' 'watershed,' 'bubble,' or 'umbrella' permit) that set an enforceable cap on specific pollutant discharges are all automatically counted as having traded.

WQ-21

Number of water segments identified as
impaired in 2002 for which States and EPA
agree that initial restoration planning is
complete (i.e., EPA has approved all needed
TMDLs for pollutants causing impairments to
the waterbody or has approved a 303(d) list that
recognizes that the waterbody is covered by a
Watershed Plan [i.e., Category 4b or Category
5m]). (cumulative)

I



Indicator





























FY 2009 END OF YEAR RESULT





13,515

13,515

4,866

266

2,596

1,804

947

n/a

1,759

206

96

975







FY 2008 END OF YEAR RESULT





12,856

12,856

4,978

266

2,240

1,799

868

n/a

1,698

206

96

705







FY 2007 END OF YEAR RESULT





6,792

6,792

529

332

1,313

1,322

506

263

1,637

200

47

643







FY 2005 BASELINE





n/a





























UNIVERSE (2002)





39,503*

39,503

6,710

1,805

8,998

5,274

4,550

1,407

2,036

1,274

1,041

6,408







National Program Manager Comments

For FY 2009, geo-referencing data will be requested for reported segments. Universe consists of waters identified as impaired in state submission in
to Region 6 universe.

2002. * Adjustments made to Region 3 FY 06 end-year result and

WQ-22a

Number of Regions that have completed the
development of a Healthy Watersheds Initiative
(HWI) Strategy and have reached an agreement
with at least one state to implement its portion
of the Region's HWI Strategy.

I



Indicator





























FY 2010 BASELINE





0



0

0

0

0

0

0

0

0

0

0

0





UNIVERSE





n/a



1

1

1

1

1

1

1

1

1

1

1





National Program Manager Comments

New measure for FY 2011.

WQ-22b

Number of states that have completed at least 2
of the major components of a Healthy
Watershed Initiative assessment.

I



Indicator





























FY 2010 BASELINE





0



0

0

0

0

0

0

0

0

0

0

n/a





UNIVERSE





n/a



n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a





National Program Manager Comments

New measure for FY 2011.

WQ-23

Percent of serviceable rural Alaska homes with
access to drinking water supply and wastewater
disposal

OMB PA
BUD

91%

91%

























100%



FY 2010 BASELINE





91%





























UNIVERSE





N/A





























National Program Manager Comments

New measure for FY 2011. Since this is a new measure, the baseline is the current year. The universe is not applicable since this units are percent of serviceable homes.

Page 19 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

WQ-24

Number of American Indian and Alaska Native
homes provided access to basic sanitation in
coordination with other federal agencies.

ARRA
SP



52,300

























67,900



FY 2009 BASELINE





43,600





























UNIVERSE





360,000





























National Program Manager Comments

New measure for FY 2011, to supplement SP-15 in the NWPG and replace SP-15 in the new Strategic Plan.

Subobjective 2.2.2 Improve Coastal and Ocean Waters





2.2.2

Prevent water pollution and protect coastal and
ocean systems to improve national and regional
coastal aquatic system health on the
'good/fair/poor' scale of the National Coastal
Condition Report.

OMB PA

Long-
Term

2.8























2.8

2.8



FY 2010 COMMITMENT





2.8























2.8





FY 2009 END OF YEAR RESULT





2.4























2.4





FY 2008 END OF YEAR RESULT





2.4























2.4





FY 2004 BASELINE





2.3























2.3





UNIVERSE





5























5





National Program Manager Comments

Rating consists of a 5-point system where 1 is poor and 5 is good.

SP-16

Maintain aquatic ecosystem health on the
'good/fair/poor' scale of the National Coastal
Condition Report in the Northeast Region.





2.4























2.4

2.4



FY 2010 COMMITMENT





2.4























2.4





FY 2009 END OF YEAR RESULT





2























1.8





FY 2008 END OF YEAR RESULT





1.8























1.8





FY 2004 BASELINE





1.8























1.8





UNIVERSE





5























5





National Program Manager Comments

FY 07 end-of-year data not from ACS. (For Gulf of Mexico, see Subobjective 4.3.5)

SP-17

Maintain aquatic ecosystem health on the
'good/fair/poor' scale of the National Coastal
Condition Report in the Southeast Region.





3.6























3.6

3.6



FY 2010 COMMITMENT





3.6























3.6





FY 2009 END OF YEAR RESULT





4























3.8





FY 2008 END OF YEAR RESULT





3.8























3.8





FY 2004 BASELINE





3.8























3.8





UNIVERSE





5























5





National Program Manager Comments

FY 07 end-of-year data not from ACS. (For Gulf of Mexico, see Subobjective 4.3.5)

SP-18

Maintain aquatic ecosystem health on the
'good/fair/poor' scale of the National Coastal
Condition Report in the West Coast Region.





2.4























2.4

2.4



FY 2010 COMMITMENT





2.4























2.4





FY 2009 END OF YEAR RESULT





2























2





FY 2008 END OF YEAR RESULT





2























2





FY 2004 BASELINE





2























2





UNIVERSE





5























5



Page 20 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

FY 07 end-of-year data not from ACS. (For Gulf of Mexico, see Subobjective 4.3.5)

SP-19

Maintain aquatic ecosystem health on the
'good/fair/poor' scale of the National Coastal
Condition Report in Puerto Rico.





1.7























1.7

1.7



FY 2010 COMMITMENT





1.7























1.7





FY 2009 END OF YEAR RESULT





2























1.7





FY 2008 END OF YEAR RESULT





0





























FY 2004 BASELINE





1.7























1.7





UNIVERSE





5























5





National Program Manager Comments

FY 07 end-of-year data not from ACS. (For Gulf of Mexico, see Subobjective 4.3.5)

SP-20

Percent of active dredged material ocean
dumping sites that will have achieved
environmentally acceptable conditions (as
reflected in each site's management plan and
measured through on-site monitoring
programs).

BUD

95%

95%

99%

100%

100%

100%

90%

n/a

100%

n/a

n/a

100%

100%



95%



FY 2010 COMMITMENT





98%

99%

100%

100%

100%

90%

n/a

100%

n/a

n/a

100%

100%







FY 2009 END OF YEAR RESULT





99%



100%

100%

100%

95%

n/a

100%

n/a

n/a

100%

100%







FY 2008 END OF YEAR RESULT





99%



100%

100%

100%

90%

n/a

100%

n/a

n/a

100%

100%







FY 2005 BASELINE





94% (60)



5

3

2

17

n/a

15

n/a

n/a

11

7







2010 UNIVERSE





65



5

3

2

19

n/a

15

n/a

n/a

11

10







National Program Manager Comments

FY 07 end-of-year data is shown numerically in ACS. Indicator measure in FY 07.

CO-2

Total coastal and non-coastal statutory square
miles protected from vessel sewage by "no
discharge zone(s)." (cumulative)

I



Indicator





























FY 2009 END OF YEAR RESULT





33,966,989

33,966,990

1,897,585

821,490

41,711

1,775,702

29,248,806

1,280

0

162,560

17,856

0







FY 2008 END OF YEAR RESULT





6,100

6,100

1,241

276

80

1,830

2,606

2

n/a

n/a

65

0







FY 2009 BASELINE





52,607

52,607

2,511

1,271

65

2,775

45,701

2

0

254

28

0







UNIVERSE





163,129

163,129

6,453

5,995

7,882

24,128

55,419

9,905

568

1,749

9,883

41,145







National Program Manager Comments

This is the first reporting year in which both inland and coastal no discharge zones (NDZs) will be tracked. In addition, NDZs will be measured in area, not coastline miles. As a result, the "universe" will consist of
the total area of water eligible to be designated as a NDZ under the current regulations.

Measure revised for FY 09.

CO-3

Number of National Estuary Program priority
actions in Comprehensive Conservation and
Management Plans (CCMPs) that have been
completed, (cumulative)

I



Indicator





























FY 2009 END OF YEAR RESULT





145

145

0

0

0

92

n/a

31

n/a

n/a

22

0







FY 2008 END OF YEAR RESULT





330

330

164

15

12

110

n/a

29

n/a

n/a

0

0







FY 2007 END OF YEAR RESULT





557

557

159

60

1

37

n/a

31

n/a

n/a

0

269







FY 2005 BASELINE





225

225

135

11

0

9

n/a

13

n/a

n/a

46

11







UNIVERSE





2,038

2,038

289

468

214

365

n/a

183

n/a

n/a

250

269







National Program Manager Comments



Page 21 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

CO-4

Dollar value of "primary" leveraged resources
(cash or in-kind) obtained by the NEP Directors
and/or staff in millions of dollars rounded to the
nearest tenth of a percent.

I



Indicator





























FY 2009 END OF YEAR RESULT





$514.6

$514.6

$337.6

$14.8

$10.1

$65.6

n/a

$12.5

n/a

n/a

$21.0

$53.0







FY 2008 END OF YEAR RESULT





$160.9

$160.9

$12.4

$14.8

$6.0

$101.7

n/a

$8.3

n/a

n/a

$11.2

$6.5







FY 2007 END OF YEAR RESULT





$208.1

$208.1

$53.6

$2.8

$4.5

$114.7

n/a

$11.2

n/a

n/a

$10.3

$11.0







FY 2005 BASELINE





$158.8

$158.8

$12.3

$46.9

$7.7

$19.1

n/a

$4.5

n/a

n/a

$51.0

$17.3







UNIVERSE





n/a





























National Program Manager Comments

(Dollars in millions and rounded to nearest tenth of a percent).

Note that "primary" leveraged dollars are those the National Estuary Program (NEP) played the central role in obtaining. An example of primary leveraged dollars would be those obtained from a successful grant

proposal written by the NEP.

FY 06 end-of-year data is not from ACS.

CO-5

Number of dredged material management plans
that are in place for major ports and harbors.

I



Indicator





























FY 2009 END OF YEAR RESULT





38

38

5

3

8

2

n/a

14

n/a

n/a

3

3







FY 2008 END OF YEAR RESULT





37

37

5

1

7

2

n/a

14

n/a

n/a

2

6







FY 2007 END OF YEAR RESULT





30

30

8

1

5

2



6

n/a

n/a

2

6







FY 2005 BASELINE





15

15

2

1

2

0



3

n/a

n/a

2

5







UNIVERSE





104

104

10

3

8

18

28

14

n/a

n/a

12

11







National Program Manager Comments

*This number represents major coastal/Great Lakes ports/harbors (commercially significant/deep draft and regionally significant). Development of a dredged material management plan is not necessary or feasible
for all ports and harbors in the universe.

CO-6

Number of active dredged material ocean
dumping sites that are monitored in the
reporting year.

I



Indicator





























FY 2009 END OF YEAR RESULT





38

38

2

1

2

6

n/a

11

n/a

n/a

6

10







FY 2008 END OF YEAR RESULT





28

28

1

2

2

6

n/a

4

n/a

n/a

4

9







FY 2007 END OF YEAR RESULT





33

33

5

3

3

5

n/a

5

n/a

n/a

3

9







FY 2005 BASELINE





n/a

15

2

1

2

0

n/a

3

n/a

n/a

2

5







UNIVERSE





61

61

5

3

2

19

n/a

14

n/a

n/a

11

7







National Program Manager Comments



CO-7

Maintain aquatic ecosystem health on the
"good/fair/poor" scale of the National Coastal
Condition Report in the Hawaii Region.





4.5

























4.5



FY 2010 COMMITMENT





4.5





























FY 2009 END OF YEAR RESULT





4.5





























FY 2008 BASELINE





0





























UNIVERSE





0





























National Program Manager Comments

New measure starting in FY 2010

Page 22 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

CO-8

Maintain aquatic ecosystem health on the
"good/fair/poor" scale of the National Coastal
Condition Report in the South Central Alaska
Region





5.0

























5.0



FY 2010 COMMITMENT





5.0





























FY 2009 END OF YEAR RESULT





5.0





























FY 2008 BASELINE





0





























UNIVERSE





0





























National Program Manager Comments

New measure starting in FY 2010

4.3.2

Working with partners, protect or restore
additional acres of habitat within the study
areas for the 28 estuaries that are part of the
National Estuary Program (NEP).

OMB PA
BUD
SMM

100,000

100,000

43,504

4,544

1,105

3,500

30,000

n/a

3,000

n/a

n/a

200

1,155



500,000



FY 2010 COMMITMENT





100,000

44,089

5,240

1,115

3,100

30,000

n/a

3,000

n/a

n/a

227

1,407







FY 2009 END OF YEAR RESULT





125,437



6,184

1,690

4,642

101,792

n/a

3,943

n/a

n/a

4,861

2,325







FY 2008 END OF YEAR RESULT





82,828



3,267

1,860

7,858.5

43,763.8

n/a

3,643

n/a

n/a

21,873

562.7







FY 2005 BASELINE





449,241



14,562

15,009

33,793

232,605

n/a

54,378

n/a

n/a

82,363

16,531







UNIVERSE





n/a





























National Program Manager Comments

Note: This measure is under Goal 4 in the 2006-2011 Strategic Plan. FY 05 cumulative end-of-year regional data used for baseline is not from ACS. The FY10 Planning Target is higher than the Regional
aggregrates because the planning target aligns with our target included in the FY11 budget.

Subobjective 4.3.1 Increase Wetlands



SP-21

Working with partners, achieve a net increase
of acres of wetlands per year with additional
focus on biological and functional measures
and assessment of wetland condition.





Target deferred for
FY 2011























Target
deferred for
FY 2011

100,000 per
year



FY 2010 COMMITMENT





Commitment
deferred for FY
2010























Commitment
deferred for
FY 2010





FY 2009 END OF YEAR RESULT





n/a























n/a





FY 2008 END OF YEAR RESULT





32,000























32,000





FY 2005 BASELINE





32,000























32,000





UNIVERSE



































National Program Manager Comments

FY 05 end-of-year data not from ACS. FY 06 result (estimated 64,000 acres) fell short based on simple extrapolation of most recent annual rate ('98-'04). The next Status and Trends Report (2011) should show a
continuation of upward trends. Data source: U.S. DOI, U.S. Fish and Wildlife Service, 2010. Status and Trends of Wetlands in the Conterminous United States 2005-2009, Washington, DC.

Qualifying language: The 2005-2009 reporting period of this measure reflects that the data: a) are published in 5-year increments, which creates a fixed numerical target until the next report publication; and b) are
already at least two years old upon publication. Thus, at any given time, reporting against this measure is never current.

SP-22

In partnership with the U. S. Army Corps of
Engineers, states and tribes, achieve 'no net
loss' of wetlands each year under the Clean
Water Act Section 404 regulatory program.

BUD

Nonet
loss

No Net Loss























No Net Loss

No Net Loss



FY 2010 COMMITMENT





No Net Loss























No Net Loss





FY 2009 END OF YEAR RESULT





No Net Loss























No Net Loss





FY 2008 END OF YEAR RESULT





data n/a























data n/a



Page 23 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2005 BASELINE



































UNIVERSE



































National Program Manager Comments

Data source: U.S. Fish & Wildlife Service Wetland Status and Trends Report.

WT-1

Number of acres restored and improved, under
the 5-Star, NEP, 319, and great waterbody
programs (cumulative).

BUD

118,000

118,000























118,000





FY 2010 COMMITMENT





96,000
(revised to 110,00
in FY 11 Budget)























96,000
(revised to
110,00 in FY
11 Budget)





FY 2009 END OF YEAR RESULT





103,507























103,507





FY 2008 END OF YEAR RESULT





82,875























82,875





FY 2006 BASELINE





58,777





























UNIVERSE





n/a























n/a





National Program Manager Comments

These acres may include those supported by Wetland 5 Star Restoration Grants, National Estuary Program, Section 319 grants, Brownfields grants, or EPA's Great Waterbodies Program
Commitment represents a cumulative total. Unexpected accomplishments in FY 06, particularly in the National Estuary Program, contributed significantly to the total number of wetland

acres restored and enhanced.

WT-2a

Number of states/tribes that have substantially
built or increased capacity in wetland
regulation, monitoring and assessment, water
quality standards, and/or restoration and
protection. (This is an annual reporting
measure.)

I



Indicator





























FY 2009 END OF YEAR RESULT





22

22

6

0

5

3

4

0

1

0

1

2







FY 2008 END OF YEAR RESULT





22

22

6

0

5

3

0

1

1

3

1

2







FY 2007 END OF YEAR RESULT





25

25

6

0

5

8

1

1

1

0

1

2







FY 2005 BASELINE





20

20

6

0

3

7

0

0

1

3

0

0







UNIVERSE





50

50

6

2

5

8

6

5

4

6

4

4







National Program Manager Comments

Substantial progress to be shown in three of the six areas identified during the last 3 years (i.e. monitoring, regulation, restoration, water quality standards, mitigation compliance, and partnership building). *This is
not a true baseline since this measure is evaluated annually and is more akin to a rate than a cumulative measure.

WT-2b

Number of core elements (regulation,
monitoring and assessment, water quality
standards, or restoration and protection)
developed and implemented by (number) of
States/Tribes.

I



Indicator





























FY 2009 END OF YEAR RESULT





39

39

8

0

n/a

0

22

0

1

0

3

5







FY 2008 END OF YEAR RESULT





24

24

8

0

0

0

5

0

1

3

2

5







FY 2007 END OF YEAR RESULT





11

11

0

0

n/a

0

3

0

1

0

2

5







FY 2005 BASELINE





n/a





























UNIVERSE





579

579

9

7

0

6

36

68

9

27

146

271







National Program Manager Comments

Substantial progress to be shown in three of the six areas identified during the last 3 years (i.e. monitoring, regulation, restoration, water quality standards, mitigation compliance, and partnership building). *This is
not a true baseline since this measure is evaluated annually and is more akin to a rate than a cumulative measure.

WT-3

Percent of Clean Water Act Section 404
standard permits, upon which EPA coordinated
with the permitting authority (i.e., Corps or
State), where a final permit decision in FY 08
documents requirements for greater
environmental protection* than originally
proposed.

I



Indicator



























Page 24 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2009 END OF YEAR RESULT





n/a





























FY 2005 BASELINE



































UNIVERSE



































National Program Manager Comments

New starting in FY 08. Reported on by Regions and HQ. ** FY 07 end-of-year data not available till June 2008.

* "Requirements for greater environmental protection" are counted under this measure when EPA can document that its recommendations for improvement provided in one or more of the following issue areas were
incorporated into the final permit decision:

1.	Demonstration of adequate impact avoidance, including:

a) Determination of water dependency; b) Characterization of basic project purpose; c) Determination of range of practicable alternatives; d) Evaluation of direct, secondary and cumulative impacts for practicable
alternatives; e) Identification of Least Environmentally Damaging Practicable Alternative; f) Compliance with WQS, MPRSA, ESA and/or toxic effluent standards; g) Evaluation of potential for significant
degradation.

2.	Demonstration of adequate impact minimization

3.	Determination of adequate compensation

Note: The documented permit decision can be in the form of an issued, withdrawn, or denied permit. The universe is the number of individual permits where EPA has the opportunity to comment (approximately
20,000/year). Regional priorities dictate the specific permits for which EPA submits comments. This number is typically less than 20,000.

WT-4

Number of states measuring baseline wetland
condition - with plans to assess trends in
wetland condition - as defined through
condition indicators and assessments
(cumulative).





21

25

5

0

4

1

2

1

3

4

1

4







FY 2010 COMMITMENT





21

21

4

0

4

1

2

1

3

4

1

1







FY 2009 END OF YEAR RESULT





20



3

0

4

1

2

1

2

4

1

2







FY 2008 END OF YEAR RESULT





14



2

0

5

1

2

1

1

1

0

1







FY 2005 BASELINE



































UNIVERSE



































National Program Manager Comments

By 2013, a state will document within an Integrated Water Quality Monitoring Report (IMR) the baseline condition of at least one wetland type for the entire state or all wetlands in one major river basin. States
may use either Level 1, 2, or 3 methods or the combined 3-Level approach. The state also has plans to re-survey for the purposes of evaluating trends. To maximize financial resources, states are encouraged to use a
probability survey design for measuring baseline condition.

Regions should coordinate with EPA HQ and reference the full definition for this measure to make a determination on whether a state is "on track" to meet this measure by 2013.

Measure revised for FY 09.

Subobjective 4.2.4 Sustain and Restore the U.S.-Mexico Border Environmental Health



SP-23

Loading of biochemical oxygen demand (BOD)
removed (cumulative million pounds/year) from
the U.S.-Mexico Border area since 2003.

FY 2010 COMMITMENT

OMB PA

24%

39

39











35.6





3.4





152.8
million
pounds







36

36











35





1









FY 2003 BASELINE





0





























UNIVERSE



































National Program Manager Comments

Measure revised in FY 2010. 2003 Baseline: zero pounds/year of BOD removed from U.S.-Mexico Border area waters as a result of new infrastructure projects.

SP-24

Number of additional homes provided safe
drinking water in the U.S.-Mexico border area
that lacked access to safe drinking water in
2003.

OMB PA
BUD

33,434
cumulative

300

300











300





0





45,434
cumulative



FY 2010 COMMITMENT





2,599

2,599











700





1,899







Page 25 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2009 END OF YEAR RESULT





1,584

1,584











1,584





0









FY 2008 END OF YEAR RESULT





5,162

5,162











5,162





0









FY 2003 BASELINE





0





























FY 2003 UNIVERSE





98,515





























National Program Manager Comments

Measure is regionally reported starting in FY 09. Indicator measure in FY 07.

2003 Baseline: zero additional homes provided safe drinking water in the U.S.-Mexico Border area.

2003 Universe: 98,515 known homes in the Mexico Border area lacking access to safe drinking water.

SP-25

Number of additional homes provided adequate
wastewater sanitation in the U.S.-Mexico
border area that lacked access to wastewater
sanitation in 2003.

OMB PA
BUD

345,675
cumulative

10,300

10,300











1,000





9,300





424,370
cumulative



FY 2010 COMMITMENT





100,720

100,720











100,000





720









FY 2009 END OF YEAR RESULT





43,594

43,594











39,477





4,117









FY 2008 END OF YEAR RESULT





31,686

31,686











31,686





0









FY 2003 BASELINE





0





























FY 2003 UNIVERSE





690,723





























National Program Manager Comments

Measure is regionally reported starting in FY 09. Indicator measure in FY 07.

2003 Baseline: zero additional homes provided wastewater sanitation the U.S.-Mexico Border area.

2003 Universe: 690,723 known homes in the U.S.-Mexico Border area lacking access to wastewater sanitation.

Subobjective 4.2.5 Sustain and Restore Pacific Island Territories



SP-26

Percent of population in the U. S. Pacific Island
Territories served by community water systems
that has access to continuous drinking water
meeting all applicable health-based drinking
water standards, measured on a four quarter
rolling average basis.

BUD

75%

75%



















75%





95%



FY 2010 COMMITMENT





73%



















73%









FY 2009 END OF YEAR RESULT





80%



















80%









FY 2008 END OF YEAR RESULT





79%



















79%









FY 2005 BASELINE





95% of American
Samoa; 10% of the
Commonwealth of

the Northern
Mariana Islands;
80% of Guam





























UNIVERSE



































National Program Manager Comments

New measure starting in FY 08.

Page 26 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

SP-27

Percentage of time that sewage treatment plants
in the U.S. Pacific Island Territories comply
with permit limits for biochemical oxygen
demand (BOD) and total suspended solids
(TSS).

BUD

63%

63%



















63%





90%



FY 2010 COMMITMENT





62%



















62%









FY 2009 END OF YEAR RESULT





65%



















65%









FY 2008 END OF YEAR RESULT





67%



















67%









FY 2005 BASELINE





59%



















59%









UNIVERSE



































National Program Manager Comments

New measure starting in FY 08.

SP-28

Percent of days of the beach season that
beaches in each of the U.S. Pacific Island
Territories monitored under the Beach Safety
Program will be open and safe for swimming.

BUD

82%

82%



















82%





96%



FY 2010 COMMITMENT





80%



















80%









FY 2009 END OF YEAR RESULT





81%



















81%









FY 2008 END OF YEAR RESULT





80%



















80%









FY 2005 BASELINE





84%



















84%









UNIVERSE



































National Program Manager Comments

New measure starting in FY 08.

Subobjective 4.3.3 Improve the Health of the Great Lakes



4.3.3

Improve the overall ecosystem health of the
Great Lakes by preventing water pollution and
protecting aquatic ecosystems.

OMB PA

23.4

23.4











23.4













23.5



FY 2010 COMMITMENT





23.0











23

















FY 2009 END OF YEAR RESULT





23.9











23.9

















FY 2008 END OF YEAR RESULT





23.7











23.7

















FY 2005 BASELINE





21.5











21.5

















UNIVERSE





40.0











40.0

















National Program Manager Comments

Subobjective 4.3.3 provides a general indication of progress of numerous state and federal programs, with a specific focus on coastal wetlands, phosphorus concentrations, AOC sediment contamination, benthic
health, fish tissue contamination, beach closures, drinking water quality, and air toxics deposition.

SP-29

Cumulative percentage decline for the long
term trend in average concentrations of PCBs in
Great Lakes fish.

OMB PA
BUD

14%

14%











14%













5%
(old
measure)



FY 2010 COMMITMENT





5%

(old measure)











5%

















FY 2009 END OF YEAR RESULT





6%











6%

















FY 2008 END OF YEAR RESULT





6%











6%

















FY 2005 BASELINE



































UNIVERSE

































Page 27 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

SP-29 indicates that PCBs in top predator fish (generally lake trout, but walleye in Lake Erie) at monitored sites is expected to continue an average annual decrease of 5%. A 2-year lag between measurement and
reporting means that the FY 09 target pertains to measurements made in 2007. *1990 baseline: Concentrations levels at stations in Lakes Superior [0.45 ppm], Michigan [2.72 ppm], Huron [1.5 ppm], Erie
[1.35ppm], & Ontario [2.18 ppm].

SP-31

Number of Areas of Concern in the Great Lakes
where all management actions necessary for
delisting have been implemented (cumulative)

OMB PA
I



Indicator





























FY 2009 END OF YEAR RESULT





1











1

















FY 2008 END OF YEAR RESULT





1











1

















FY 2007 END OF YEAR RESULT





1











1

















FY 2005 BASELINE





1











1

















UNIVERSE





31











31

















National Program Manager Comments

Measure changed to indicator starting in FY 2011. SP-31 identifies a cumulative target of taking all necessary management actions to delist 3 of the original 31 US or binational Areas of Concern. Only 1 AOC (in
New York) has been de-listed to date.

SP-32

Cubic yards (in millions) of contaminated
sediment remediated in the Great Lakes
(cumulative from 1997).

OMB PA
BUD

7.2 million

7.2 million











7.2 million













9.6 million



FY 2010 COMMITMENT





6.4 million











6.4 million

















FY 2009 END OF YEAR RESULT





6 million











6 million

















FY 2008 END OF YEAR RESULT





5.5 million











5.5 million

















FY 2005 BASELINE





3.7million











3.7million

















UNIVERSE





46 million











46 million

















National Program Manager Comments

Universe identifies quantity of contaminated sediment estimated to require remediation as of 1997. This total has been revised from a previous estimate of 75 million cubic yards based on state-submitted
information and subsequent decisions, information verification, and actual remediations. Information lags behind (i.e. the 2007 commitment is for calendar year 2006 sediment remediation).

GL-5

Number of Beneficial Use Impairments
removed within Areas of Concern, (cumulative)

OMB PA
BUD

26

26











26













46



FY 2010 COMMITMENT





26

(20 in FY 2011
Pres Bud)











26

















FY 2009 END OF YEAR RESULT





12











12

















FY 2005 BASELINE





11





























UNIVERSE





261





























National Program Manager Comments

New measure added for FY 2009 from 2007 OMB PA review.

GL-6

Number of normative species newly detected in
the Great Lakes ecosystem.

BUD

1

1







n/a

n/a

1

















FY 2005 BASELINE





1.3





























UNIVERSE





181





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

GL-7

Number of multi-agency rapid response plans
established, mock exercises to practice
responses carried out under those plans, and/or
actual response actions (cumulative).

BUD

7

7







n/a

n/a

7















Page 28 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2005 BASELINE





0





























UNIVERSE





n/a





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

GL-8

Percentage of beaches meeting bacteria
standards 95% or more of beach days.

BUD

87%

87 %







90%

n/a

88%

















FY 2006 BASELINE





86%





























UNIVERSE





100%











320

















National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

GL-9

Acres managed for populations of invasive
species controlled to a target level (cumulative).

BUD

1,500

1,500







n/a

n/a

1,500

















FY 2005 BASELINE





0





























UNIVERSE





n/a





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

GL-10

Percent of populations of native aquatic non-
threatened and endangered species self-
sustaining in the wild (cumulative).

BUD

35%
52/147
pop

35%







n/a

n/a

35%













57%



52











52













84



FY 2009 BASELINE





27%





























UNIVERSE





147





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan. Numerator: # of populations of native aquatic non-T&E and non-candidate species that are self-sustaining in the
wild. Denominator: total # of native aquatic non-T&E and non-candidate populations. Baseline: 39/147 populations.

GL-11

Number of acres of wetlands and wetland-
associated uplands protected, restored and
enhanced (cumulative).

BUD

7,500

7,500







n/a

n/a

7,500

















FY 2005 BASELINE





0





























UNIVERSE





550,000





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

GL-12

Number of acres of coastal, upland, and island
habitats protected, restored and enhanced
(cumulative).

BUD

20,000

20,000







n/a

n/a

20,000

















FY 2005 BASELINE





0





























UNIVERSE





1,000,000





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

GL-13

Number of species delisted due to recovery.

BUD

1

1







n/a

n/a

1

















FY 2005 BASELINE





0





























UNIVERSE





28





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

Page 29 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

GL-14

Number of Areas of Concern in the Great Lakes
where all management actions necessary for
delisting have been implemented (cumulative).

BUD

3

3







n/a

n/a

3













6



FY 2005 BASELINE





1





























UNIVERSE





31





























National Program Manager Comments

New measure starting in FY 2011, added from the Great Lakes Restoration Initiative Action Plan.

Subobjective 4.3.4 Improve the Health of the Chesapeake Bay Ecosystem



SP-33

Percent of Submerged Aquatic Vegetation goal
of 185,000 acres achieved, based on annual
monitoring from prior year.

OMB PA

45

45







45

















45% (83,250
acres)



FY 2010 COMMITMENT





Long Term
Measure







n/a





















FY 2009 END OF YEAR RESULT





42%
(76,861 acres)







42%
(76,861
acres)





















FY 2008 END OF YEAR RESULT





35%
(64,912 acres)







35%
(64,912
acres)





















FY 2005 BASELINE





39% (72,945)





























UNIVERSE





185,000 acres





























National Program Manager Comments

Starting in 2008, the Agency no longer sets annual commitments for SAV (SP-33) due to the extreme variability in the annual results. Instead, EPA set a long term target of 45% goal achievement in 2011.

SP-34

Percent of Dissolved Oxygen goal of 100%
standards attainment achieved, based on annual
monitoring from the previous calendar year and
the preceding 2 years.

OMB PA

40

20







20

















40% (29.92
cubic km)



FY 2010 COMMITMENT





Long Term
Measure







n/a





















FY 2009 END OF YEAR RESULT





16% (12.27 km3)







16%
(12.27
km3)





















FY 2008 END OF YEAR RESULT





12%
(8.98 km3)







12%
(8.98 km3)





















FY 2005 BASELINE





30% (22.73 km)





























UNIVERSE





100% (74.8 km3)





























National Program Manager Comments

The DO measure (SP-34) was first used in the Agency's Strategic Plan in 2008 (however, the Chesapeake Bay Program has been reporting results for this measure for many years). Annual commitments are not
made due to the extreme variability in the annual results. Instead, EPA set a long term target of 40% goal achievement in 2011.

SP-35

Percent of goal achieved for implementation of
nitrogen reduction practices (expressed as
progress in meeting the nitrogen reduction goal
of 162.5 million pounds from 1985 levels to
achieve an annual cap load of 175 million lbs
(based on long-term average hydrology
simulations).

OMB PA
BUD

56%

56%







56%

















60% (97.43
M lbs)

Page 30 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2010 COMMITMENT





52%
(84.44 M lbs)







52%
(84.44 M
lbs)





















FY 2009 END OF YEAR RESULT





49% (79.01 M lbs)







49%
(79.01 M
lbs)





















FY 2008 END OF YEAR RESULT





47% (75.6 M lbs)







47% (75.6
Mlbs)





















FY 2005 BASELINE





41% (67 M lbs)







41% (67 M
lbs)





















UNIVERSE





100% (162.5 M
lbs)







100%
(162.5 M
lbs)





















National Program Manager Comments

All targets, commitments and results are calculated using outputs of the phase 4.3 watershed model progress run simulations in relation to the existing long-term reduction goal (162.5 M lbs). When the Bay TMDL
is finalized in Dec 2010, CBP will begin reporting targets, commitments and results using the phase 5.3 watershed model in relation to a new reduction goal.

SP-36

Percent of goal achieved for implementation of
phosphorus reduction practices (expressed as
progress in meeting the phosphorus reduction
goal of 14.36 million pounds from 1985 levels
to achieve an annual cap load of 12.8 million
lbs (based on long-term average hydrology
simulations).

OMB PA
BUD

70%

70%







70%

















74% (10.62
Mlbs)



FY 2010 COMMITMENT





66%
(9.48 M lbs)







66%
(9.48 M
lbs)





















FY 2009 END OF YEAR RESULT





65% (9.38 M lbs)







65% (9.38
Mlbs)





















FY 2008 END OF YEAR RESULT





62% (8.9 M lbs)







62% (8.9
Mlbs)





















FY 2005 BASELINE





58% (8.4 M lbs)







58% (8.4
M lbs)





















UNIVERSE





100% (14.36 M
lbs)







100%
(14.36M
lbs)





















National Program Manager Comments

All targets, commitments and results are calculated using outputs of the phase 4.3 watershed model progress run simulations in relation to the existing long-term reduction goal (14.36 M lbs). When the Bay TMDL
is finalized in Dec 2010, CBP will begin reporting targets, commitments and results using the phase 5.3 watershed model in relation to a new reduction goal.

SP-37

Percent of goal achieved for implementation of
sediment reduction practices (expressed as
progress in meeting the sediment reduction goal
of 1.69 million tons from 1985 levels to achieve
an annual cap load of 4.15 million tons (based
on long-term average hydrology simulations).

OMB PA
BUD

71%

68%







68%

















83% (1.4 M
tons)



FY 2010 COMMITMENT





67%
(1.13 M tons)







67%
(1.13 M
tons)



















Page 31 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2009 END OF YEAR RESULT





67%
(1.13 M tons)







64% (1.08
M tons)





















FY 2008 END OF YEAR RESULT





64% (1.07 M tons)







64% (1.07
M tons)





















FY 2005 BASELINE





54% (0.9 M tons)







54% (0.9
M tons)





















UNIVERSE





100% (1.69 M
tons)







100%
(1.69 M
tons)





















National Program Manager Comments

All targets, commitments and results are calculated using outputs of the phase 4.3 watershed model progress run simulations in relation to the existing long-term reduction goal (4.15 M tons). When the Bay TMDL
is finalized in Dec 2010, CBP will begin reporting targets, commitments and results using the phase 5.3 watershed model in relation to a new reduction goal.

CB-la

Percent of point source nitrogen reduction goal
of 49.9 million pounds achieved.

OMB PA
BUD

76%

76%







76%





















FY 2010 COMMITMENT





74%
(36.92 M lbs)







74%
(36.92 M
lbs)





















FY 2009 END OF YEAR RESULT





70% (34.9 M lbs)







70% (34.9
Mlbs)





















FY 2008 END OF YEAR RESULT





69%







69%





















FY 2005 BASELINE





60.95%







61%





















UNIVERSE





100% (49.9 M
lbs/yr)







100%
(49.9 M
lbs/yr)





















National Program Manager Comments

All targets, commitments and results are calculated in relation to the existing long-term reduction goal (49.9 M lbs). When the Bay TMDL is finalized in Dec 2010, CBP will begin reporting targets, commitments
and results in relation to a new reduction goal.

CB-lb

Percent of point source phosphorus reduction
goal of 6.16 million pounds achieved.

OMB PA
BUD

96%

96%







96%





















FY 2010 COMMITMENT





96% (5.92 M lbs)







96% (5.92
Mlbs)





















FY 2009 END OF YEAR RESULT





96% (5.92 M lbs)







96% (5.92
Mlbs)





















FY 2008 END OF YEAR RESULT





87 %







87%





















FY 2005 BASELINE





80%







80%





















UNIVERSE





100% (6.16 M
lbs/yr)







100%
(6.16 M
lbs/yr)





















National Program Manager Comments

All targets, commitments and results are calculated in relation to the existing long-term reduction goal (6.16 M lbs). When the Bay TMDL is finalized in Dec 2010, CBP will begin reporting targets, commitments
and results in relation to a new reduction goal.

CB-2

Percent of forest buffer planting goal of 10,000
miles achieved.

OMB PA
BUD

68%

68%







68%





















FY 2010 COMMITMENT





65%
(6,522 miles)







65%
(6,522
miles)





















FY 2009 END OF YEAR RESULT





62% (6,172 miles)







62%
(6,172
miles)



















Page 32 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2008 END OF YEAR RESULT





57%







57%





















FY 2005 BASELINE





38%







38%





















UNIVERSE





100% (10,000
miles)







100%
(10,000
miles)





















National Program Manager Comments

Based on preliminary results, it appears that we will meet the FY 2009 commitment for CB-2.

Subobjective 4.3.5 Improve the Health of the Gulf of Mexico



4.3.5

Improve the overall health of coastal waters of
the Gulf of Mexico on the "good/fair/poor"
scale of the National Coastal Condition Report.

BUD

2.6

2.6

























2.6



FY 2010 COMMITMENT





2.5





























FY 2009 END OF YEAR RESULT





2.2





























FY 2008 END OF YEAR RESULT





2.2





























FY 2004 BASELINE





2.4





























UNIVERSE





5





























National Program Manager Comments

The rating is based on five indicators of ecological condition: water quality index, sediment quality index, benthic index, coastal habitat index, and fish tissue contaminants index.

SP-38

Restore water and habitat quality to meet water
quality standards in impaired segments in 13
priority areas, (cumulative starting in FY 07)

BUD

128

128

























160



FY 2010 COMMITMENT





96





























FY 2009 END OF YEAR RESULT





131





























FY 2008 END OF YEAR RESULT





data n/a





























FY 2002 BASELINE





0





























UNIVERSE





812





























National Program Manager Comments

SP-38 replaces FY 07 measure GM-1. FY 07 end-of-year data not from ACS. Universe changed from 354 to 812.

SP-39

Restore, enhance, or protect a cumulative
number of acres of important coastal and
marine habitats, (cumulative starting in FY 07)

BUD

30,000

30,000

























32,600



FY 2010 COMMITMENT





27,500





























FY 2009 END OF YEAR RESULT





29,344





























FY 2008 END OF YEAR RESULT





25,215





























FY 2005 BASELINE





16,000





























UNIVERSE





3,769,370 acres





























National Program Manager Comments

Coastal habitat includes marshes, wetlands, tidal flats, oyster beds, seagrasses, mangroves, dunes and maritime forest ridge areas.

SP-40

Reduce releases of nutrients throughout the
Mississippi River Basin to reduce the size of
the hypoxic zone in the Gulf of Mexico, as
measured by the 5-year running average of the
size of the zone.





Commitment
deferred

























5,000



FY 2010 COMMITMENT





Commitment
deferred





























FY 2009 END OF YEAR RESULT





n/a





























FY 2008 END OF YEAR RESULT





n/a





























FY 2005 BASELINE





14,128 km2





























UNIVERSE





n/a



























Page 33 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

Targets/commitments are deferred for measure SP-40.

GM-1

Implement integrated bi-national (U.S. and
Mexican Border States) early-warning system
to support State and coastal community efforts
to manage harmful algal blooms (HABs).





Complete
operational system
in Campeche, MX





























FY 2010 COMMITMENT





Expand operational
system to
Campeche, MX





























FY 2009 END OF YEAR RESULT





Expanded system





























FY 200S END OF YEAR RESULT





Pilot underway





























FY 2005 BASELINE



































UNIVERSE



































National Program Manager Comments

Results are measured by the number of states that have timely access to data and information for detecting, tracking, and forecasting HAB events and their effects on public health, coastal economies, and natural
resources across the Gulf of Mexico.

Subobjective 4.3.6 Restore and Protect Long Island Sound



SP-41

Percent of goal achieved in reducing trade-
equalized (TE) point source nitrogen discharges
to Long Island Sound from the 1999 baseline of
59,146 TE lbs/day.

BUD

52%

52%





52%



















100%



FY 2010 COMMITMENT





52%





52%























FY 2009 END OF YEAR RESULT





n/a





n/a























FY 2008 END OF YEAR RESULT





40,440 TE lbs/day





40,440 TE
lbs/day























FY 1999 BASELINE





211,724 lbs/day





211,724
lbs/day























UNIVERSE



































National Program Manager Comments

New measure starting in FY 08. ""Measure will be tracked in lbs/day and Trade Equalized (TE) lbs/day. TE lbs/day are pounds of nitrogen adjusted by application of the equivalency factor assigned to each point
source based on its proximity to the receiving water body (LIS). The TMDL established a Waste Load Allocation of 22,774 TE lbs/day from point sources, to be achieved over a 15 year period beginning in 1999.
The annual commitments are calculated by dividing the difference between the 1999 baseline and 2014 target by 15 (the TMDL period), or 2,425 lbs/day per year. """The Baseline and 2014 Target have been
updated from the 2006-2011 Strategic Plan. FY 06 and FY 07 data not from ACS and has been updated.

SP-42

Reduce the size (square miles) and duration
(number of days) of observed hypoxia
(Dissolved Oxygen <3mg/l) in Long Island
Sound.





Commitment
deferred for FY
2011





Commitme
nt deferred
for FY
2011



















156 square
miles and 43
days



FY 2010 COMMITMENT





Commitment
deferred for FY
2010





Commitme
nt deferred
for FY
2010























FY 2009 END OF YEAR RESULT





169 sq. miles; 45
days





169 sq.
miles; 45
days























FY 2008 END OF YEAR RESULT





180 sq. miles; 79
days





180 sq.
miles; 79
days





















Page 34 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2005 BASELINE





187 sq miles; 58.6
days





187 sq
miles; 58.6
days























UNIVERSE





1,400 sq miles
(total) 122 days
(actually
monitored)





1,400 sq
miles
(total) 122
days
(actually
monitored























National Program Manager Comments

New measure starting in FY 08. Due to inter-annual variability, annual reduction targets are not calculated for this measure. *FY 07 end-of-year data not from ACS. Note on Universe: The 20 year average
measured maximum area of hypoxia in the Sound is 203 square miles and the duration average is 58 days.

SP-43

Percent of goal achieved in restoring, protecting
or enhancing 240 acres of coastal habitat from
the 2008 baseline of 1,199 acres.

BUD

50%

50%





50%



















100%
(240 acres)



FY 2010 COMMITMENT





33%
(79 acres)





33%
(79 acres)























FY 2009 END OF YEAR RESULT





1,614





1,614























FY 2008 END OF YEAR RESULT





1,199





1,199























FY 2008 BASELINE





1,199 acres
restored &
protected





1,199 acres
restored &
protected























UNIVERSE



































National Program Manager Comments

New measures starting in FY 08. For SP-43: In September 2006, the LISS Policy Committee established the goal of restoring and protecting an additional 300 acres of coastal habitat above the baseline by 2011 -
50 acres per year for 6 years. *FY 06 and FY 07 end-of-year data not from ACS. **The 2011 targets were achieved in 2007. EPA will negotiate new 2011 targets with the LISS Management Conference partners.

SP-44

Percent of goal achieved in reopening 50 river
and stream miles to diadromous fish passage
from the 2008 baseline of 124 miles.

BUD

50%

50%





50%



















100%
(50 miles)



FY 2010 COMMITMENT





33%
(17 miles)





33%
(17 miles)























FY 2009 END OF YEAR RESULT





147





147























FY 2008 END OF YEAR RESULT





124.3





124.3























FY 2008 BASELINE





124 miles





124 miles























UNIVERSE



































National Program Manager Comments

New measures starting in FY 08. For SP-44: The states of NY and CT will re-open 50 river miles above the base for a total of 131 river miles re-opened to fish passage. FY 07 end-of-year data not from ACS. The
2011 targets were achieved in 2007. EPA will negotiate new 2011 targets with the LISS Management Conference partners.

Subobjective 4.3.7 Restore and Protect the South Florida Ecosystem



SP-45

Achieve 'no net loss' of stony coral cover (mean
percent stony coral cover) in the Florida Keys
National Marine Sanctuary (FKNMS) and in
the coastal waters of Dade, Broward, and Palm
Beach Counties, Florida, working with all
stakeholders (federal, state, regional, tribal, and
local).

I



Indicator

























No Net Loss



FY 2009 END OF YEAR RESULT





Loss









Loss

















Page 35 of 39


-------
FY 2011

ACS
Code





**FY



























***SP

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



FY 2008 END OF YEAR RESULT





Small change









Small
change



















FY 2005 BASELINE





6.8% in FKNMS;
5.9% in SE Florida









6.8% in
FKNMS;
5.9% in SE
Florida



















UNIVERSE



































National Program Manager Comments

New measures starting in FY 08. Measure change to Indicator in FY 2011. Strategic Plan baseline of 6.7% was revised to 6.8%. The Coral Reef Evaluation and Monitoring Project (CREMP) for the Florida Keys
National Marine Sanctuary was modified in 2006 by dropping one hardbottom monitoring site because of the very small percentage of stony coral cover present (less than .2%), resulting in an increase of .1 percent
in the mean percent stony coral cover for the entire Sanctuary. Statistical analyses of the CREMP indicated that sampling a reduced number of stations at sites with low stony coral cover would still produce
statistically valid results.

SP-46

Annually maintain the overall health and
functionality of sea grass beds in the FKNMS
as measured by the long-term sea grass
monitoring project that addresses composition
and abundance, productivity, and nutrient
availability.

I



Indicator

























Maintain
Baseline



FY 2009 END OF YEAR RESULT





Not maintained









Not
maintained



















FY 2008 END OF YEAR RESULT





Small change









Small
change



















FY 2005 BASELINE





EI = 8.3; SCI=0.48









EI = 8.3;
SCI=0.48



















UNIVERSE



































National Program Manager Comments

New measures starting in FY 08. Measure changed to Indicator in FY 2011. EI = Elemental Indicator; SCI =

Species Composition Index.











SP-47a

At least seventy five percent of the monitored
stations in the near shore and coastal waters of
the Florida Keys National Marine Sanctuary
will maintain Chlorophyll a(CHLA) levels at
less than or equal to 0.35 ug 1-1 and light
clarity( Kd)) levels at less than or equal to 0.20
m-1.

BUD

75%

75%









75%



















FY 2009 END OF YEAR RESULT



































FY 1995 2005 BASELINE





CHL A <0.35
ug/L (75.7%);

Kd^ 0.20m"1
(74.6%)









CHL A<
0.35 ug/L
(75.7%);

Kd<
0.20m-l
(74.6%)























































UNIVERSE





154 Stations









154 Stations

















National Program Manager Comments

New measure starting in FY 2011.

Page 36 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

SP-47b

At least seventy five percent of the monitored
stations in the near shore and coastal waters of
the Florida Keys National Marine Sanctuary
will maintain dissolved inorganic nitrogen
(DIN) levels at less than or equal to 0.75 uM
and total phosphorus (TP) levels at less than or
equal to .25 uM .

BUD

75%

75%









75%



















FY 2009 END OF YEAR RESULT



































FY 1995 2005 BASELINE





DIN <0..75 uM
(76.3%); TP
< 0.25uM (80.9%)









DIN <
0..75 uM
(76.3%);

TP <
0.25uM
(80.9%)



















UNIVERSE





154 Stations









154 Stations

















National Program Manager Comments

New measure starting in FY 2011.

SP-48

Improve the water quality of the Everglades
ecosystem as measured by total phosphorus,
including meeting the 10 parts per billion (ppb)
total phosphorus criterion throughout the
Everglades Protection Area marsh and the
effluent limits for discharges from storm water
treatment areas.

BUD

Maintain
phosphoru
s baseline
and meet
discharge
limits

Maintain
phosphorus
baseline and meet
discharge limits









Maintain
phosphorus
baseline
and meet
discharge
limits















Meet
phosphorus
criterion and
discharge
limits



FY 2010 COMMITMENT





Maintain
phosphorus
baseline and meet
discharge limits









Maintain
phosphorus
baseline
and meet
discharge
limits



















FY 2009 END OF YEAR RESULT





Not maintained









Not
maintained



















FY 2008 END OF YEAR RESULT





Not maintained









Not
maintained



















FY 2005 BASELINE



































UNIVERSE



































National Program Manager Comments

New measure starting in FY 08. 2005 Baseline: Average annual geometric mean phosphorus concentrations were 5 ppb in Everglades National Park, 10 ppb in Water Conservation Area 3A, 13 ppb in Loxahatchee
National Wildlife Refuge, and 18 ppb in Water Conservation Area 2A; annual average flow — weighted total phosphorus discharges from Stormwater Treatment Areas ranged from 13 ppb for area 3/4 and 98 ppb for
area 1W.

SFL-1

Increase percentage of sewage treatment
facilities and onsite sewage treatment and
disposal systems receiving advanced
wastewater treatment or best available
technology as recorded by EDU. in Florida
Keys two percent (1500 EDUs) annually.

I



Indicator









Indicator



















FY 2009 BASELINE





32,000









32,000



















UNIVERSE





75,000









75,000

















Page 37 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.



National Program Manager Comments

New measure starting in FY 2011.

Subobjective 4.3.8 Restore and Protect the Puget Sound Basin



SP-49

Improve water quality and enable the lifting of
harvest restrictions in acres of shellfish bed
growing areas impacted by degraded or
declining water quality, (cumulative starting in
FY 06)

BUD

1,925

1,925





















1,925



2,300



FY 2010 COMMITMENT





1,800





















0







FY 2009 END OF YEAR RESULT





1,730





















1,730







FY 2008 END OF YEAR RESULT





1,566





















1,566







FY 2007 BASELINE





322





















322







UNIVERSE





30,000 acres





























National Program Manager Comments

New measures starting in FY 08. * Baseline

is the end-of-year data for FY 07.





SP-50

Remediate acres of prioritized contaminated
sediments, (cumulative starting in FY 06)

BUD

127

127





















127



325



FY 2010 COMMITMENT





123





















0







FY 2009 END OF YEAR RESULT





123.1





















123.1







FY 2008 END OF YEAR RESULT





123





















123







FY 2007 BASELINE





120





















120







UNIVERSE





5,000 acres





















5,000 acres







National Program Manager Comments

New measures starting in FY 08. * Baseline

is the end-of-year data for FY 07.





SP-51

Restore acres of tidally- and seasonally-
influenced estuarine wetlands, (cumulative
starting in FY 06)

BUD

7,250

7,250





















7,250



9,500



FY 2010 COMMITMENT





6,500





















6,500







FY 2009 END OF YEAR RESULT





5,751





















5,751







FY 2008 END OF YEAR RESULT





4,413





















4,413







FY 2007 BASELINE





4,152





















4,152







UNIVERSE





45,000 acres





















45,000
acres







National Program Manager Comments

New measures starting in FY 08. * Baseline

is the end-of-year data for FY 07.





Subobjective 4.3.9 Restore and Protect the Columbia River Basin



SP-52

Protect, enhance, or restore acres of wetland
habitat and acres of upland habitat in the Lower
Columbia River watershed, (cumulative starting
in FY 05)

BUD

16,300

16,300





















16,300



19,000



FY 2010 COMMITMENT





16,000





















16,000







FY 2009 END OF YEAR RESULT





15,700





















15,700







FY 2008 END OF YEAR RESULT





12,986





















12,986







FY 2005 BASELINE



































UNIVERSE





96,770 acres





















96,770
acres







National Program Manager Comments

New measure starting in FY 08. FY 07 end-of year adjusted data is not from ACS. Note: 13,000 wetland habitat acres and 3,000 upland habitat acres totals 16,000 acres.

Page 38 of 39


-------
FY 2011

ACS
Code

FY 2011 National Water Program Guidance
Measure Text

Measure
Groups

**FY

2011
Budget
Target

FY 2011 Planning
Target

Regional
Aggregates

Region
1

Region
2

Region

3

Region
4

Region
5

Region
6

Region

7

Region
8

Region
9

Region
10

HQ

***SP

Proposed
Target (FY
2014)

* Measure categories include: OMB PA (OMB Program Assessment); BUD (Budget Measure); SG (State Grant Measure); SMM (Senior Management Measure); EQR (EPAStat Quarterly Report Measure); NPMStat (OW EPAStat measure), ARRA (Recovery Act Measure), and I
(Indicator Measure). ** FY 2011 Budget Target is from 4-year performance measure table in the FY 2011 Presidents Budget. *** Strategic Plan (SP) proposed targets are from the proposed EPA Strategic Plan, to be submitted to Congress in 2010.

SP-53

Clean up acres of known contaminated
sediments, (cumulative starting in FY 06)

BUD

60

60





















60



85



FY 2010 COMMITMENT





20





















20







FY 2009 END OF YEAR RESULT





10





















10







FY 2008 END OF YEAR RESULT





0





















0







FY 2005 BASELINE



































UNIVERSE





400 acres





















400 acres







National Program Manager Comments

New measures starting in FY 08.

SP-54

Demonstrate a reduction in mean concentration
of certain contaminants of concern found in
water and fish tissue, (cumulative starting in FY
06)

BUD

10%
reduction

10% reduction





















10%
reduction



10%



FY 2010 COMMITMENT





Commitment
deferred





















Commitme
nt deferred







FY 2005 BASELINE





5 sites





















5 sites







UNIVERSE



































National Program Manager Comments

New measures starting in FY 08. There will be no reporting on SP-54 until 2012.

Page 39 of 39


-------