Situation Photo Log

Friday, September 14, 2012
Kalamazoo River / Enbridge Spill

Prepared by:

Matthew Haak
START-USEPA
Situation Unit Leader


-------
Friday, September 14, 2012 Photo Log

2. Sheen and tar globules observed at MPS.20 LDB.


-------
Friday, September 14, 2012 Photo Log

4. MPS.5 LDB sheen and tar giobs observed.


-------
6. MPS.63 LDB below the railroad trestles sheen and tar globs observed.


-------
Friday, September 14, 2012 Photo Log

7. MPS.63 LDB below the railroad trestles sheen and tar globs observed.

\

8. MPS.63 LDB below the railroad trestles sheen and tar globs observed.


-------
10. CSD observed above Ceresco Dam.


-------
Friday, September 14, 2012 Photo Log

11. Ceresco Dam observed a crew performing boom maintenance.



12. Observed sheen and tar globs observed collecting along the Ceresco Dam

control point boom.


-------
Friday, September 14, 2012 Photo Log

14. MPS.55 RDB sheen and tar globs observed.


-------
Friday, September 14, 2012 Photo Log

15. MP5.0 - MP5.15 RDB sheen arid tar globs observed.

i

V

\



K

16. MP5.0 - MPS.15 RDB sheen and tar globs observed.


-------
Friday, September 14, 2012 Photo Log

17. MP28.25 Oxbow observed a crew reinstalling the CSD,

18. MP28.25 RDB sheen observed around the boat. The sediment was agitated
when docking to observe the work.


-------
Friday, September 14, 2012 Photo Log

19. MP28.25 RDB sheen observed around the boat. The sediment was agitated
when docking to observe the work.

20. MP30.8 LDB observed a Bathymetry survey.


-------
Friday, September 14, 2012 Photo Log

22. Observed the sweep boat operating between MP21.5 - MP30.8.


-------
Friday, September 14, 2012 Photo Log

24. Morrow Lake Delta observed crews performing Bathymetry surveying.


-------
Friday, September 14, 2012 Photo Log

26. Morrow Lake Delta observed crews performing Bathymetry surveying.


-------
Friday, September 14, 2012 Photo Log

27. Morrow Lake Delta observed crews performing Bathymetry surveying

28. Morrow Lake Delta Boom F observed a crew performing boom and curtain

inspection.


-------
Friday, September 14, 2012 Photo Log

30. Morrow Lake north cove a poling crew.


-------