Holistic Watershed Management for Existing and Future Land
Use Development Activities: Opportunities for Action for Local
Decision Makers: PHASE 2 - FDC APPLICATION MODELING

(FDC2A PROJECT)

SUPPORT FOR SOUTHEAST NEW ENGLAND PROGRAM (SNEP)
COMMUNICATIONS STRATEGY AND TECHNICAL ASSISTANCE

Final Report Appendix D
Runoff Duration Curves for HRU-Scale SCM Modeling

Scenarios
September 30,2022

Prepared for:
U.S. EPA Region 1

Prepared by:

Paradigm Environmental	Great Lakes Environmental Center

GleC

PARADIGM

ENVIRONMENTAL

Blanket Purchase Agreement: BPA-68HE0118A0001-0003
Requisition Number: PR-R1-20-00322
Order: 68HE0121F0052


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

0.01

\0
cN

o

SP

0s-

lh

SP
o>
O

n—i—i—i—i—r

SP
o^-
LO

xO

cN

o

rsj

sP

o\
LO
r\j

sP
cN

o
m

n—i—i—i—i—r

SP
0s*
LO
ro

sP
cN

o

<3-

\°
m
<3-

SP
0s-

o

LO

VP
Q\

LH
LO

o

nP
LO
UD

sP
o\

o

r-.

n—i—i—i—i—i—i—i—i—i—r

o\
LH

r-.

SP
o\

o

CO

Np	sP

cN	o\

LO	O

00	CH

•sP
o\
L0
CT>

Flow-Exceedance Percentiles

Figure 1. Flow duration curve with MS4 control of 30% of the Upper Hodges Brook subwatershed's impervious cover
under historic LULC and climate conditions (Scenario 1).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, no BMPs Ecosurplus: 2.18 cfs (515.0 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 2.18 cfs (513.3 MG/year)

Developed, no BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, no BMPs Ecosurplus: 2.18 cfs (515.0 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 2.17 cfs (510.8 MG/year)

Flow-Exceedance Percentiles

Figure 2. Flow duration curve with MS4 control of 80% of the Upper Hodges Brook subwatershed's impervious cover
under historic LULC and climate conditions (Scenario 1).

2


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

0.01

n—i—i—i—i—r

~i—i—i—i—i—r

~i—i—i—i—i—i—i—i—i—i—r

\0	\0	v. O	\0	\0	\o	\p	\0	\p	vO	\U	\0	\0	\0	\U	\0	\0	so	vO	\0

0\	QS.	o\	o\	o\	qS.	o\	qS.	0s*	0\	o\	o\	o\	o\	o\

OLnOLnOLnOLDOLnoLnOLnOLnoLnOLn
*H*HfN(Nrriro^-^-LnLnii)i£ir-r--ooooaiai

Flow-Exceedance Percentiles

Figure 3. Flow duration curve with MS4 control of 100% of the Upper Hodges Brook subwatershed's impervious cover
under historic LULC and climate conditions (Scenario 1).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

Developed, no BMPs Ecodeficit: 0.22 cfs (52.3 MG/year)
Developed, no BMPs Ecosurplus: 1.38 cfs (326.5 MG/year)
Developed, with BMPs Ecodeficit: 0.15 cfs (35.7 MG/year)
Developed, with BMPs Ecosurplus: 1.30 cfs (307.4 MG/year)

^ 10

5
o

0.1

0.01

Flow-Exceedance Percentiles

Figure 4. Flow duration curve with MS4 control of 30% of the Upper Hodges Brook subwatershed's impervious cover
under historic LULC and future climate conditions (Scenario 2).

Developed, no BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, no BMPs Ecosurplus: 2.18 cfs (515.0 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 2.16 cfs (510.7 MG/year)

3


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs

0.1

Pre-Development

Developed, no BMPs Ecodeficit: 0.22 cfs (52.3 MG/year)
Developed, no BMPs Ecosurplus: 1.38 cfs (326.5 MG/year)
Developed, with BMPs Ecodeficit: 0.07 cfs (16.6 MG/year)
Developed, with BMPs Ecosurplus: 1.21 cfs (284.8 MG/year)

Flow-Exceedance Percentiles

Figure 5. Flow duration curve with MS4 control of 80% of the Upper Hodges Brook subwatershed's impervious cover
under historic LULC and future climate conditions (Scenario 2).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.22 cfs (52.3 MG/year)
Developed, no BMPs Ecosurplus: 1.38 cfs (326.5 MG/year)
Developed, with BMPs Ecodeficit: 0.05 cfs (11.4 MG/year)
Developed, with BMPs Ecosurplus: 1.18 cfs (278.4 MG/year)

Flow-Exceedance Percentiles

Figure 6. Flow duration curve with MS4 control of 100% of the Upper Hodges Brook subwatershed's impervious cover
under historic LULC and future climate conditions (Scenario 2).

4


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development





































Developed,

no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)

































—





—









Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.02 cfs (4.6 MG/year)















































































Developed, with BMPs Ecosurplus: 1.93 cfs (456.1 MG/year)





























































































































































































































































































































—































































































































































































































1

























































i















i



















\0 >nO \0 \0 \0 yO vO sp \0 \p sP \P \0 \P yO \0 vO \0 \0 \0
0\ QS. o\ o\ QV. o\ 0s"-	0s. o\ (JS OS. OS OS o\ cJs oS OS OS o\

OLnOLnOLnOLDOLnoLnOLnOLnoLnOLn
*H*HfN(Nrriro^-^-LnLnii)i£ir-r--ooooaiai

Flow-Exceedance Percentiles

Figure 7. Flow duration curve with MS4 control of 30% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and historic climate conditions (Scenario 3).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 1.90 cfs (449.2 MG/year)

Flow-Exceedance Percentiles

Figure 8. Flow duration curve with MS4 control of 80% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and historic climate conditions (Scenario 3).

5


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development



































Developed,

no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)







[—









































Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)















































































Developed, with BMPs Ecosurplus: 1.90 cfs (448.5 MG/year)

























































































—

—

=

—

—

—

—

—

=

—

—

=

—

—



—

—

—











—

































-



—

—

—

—



-























































































































































































—J













































































































































































I

























































i















i



















\0 >nO \0 \0 \0 yO vO sp \0 \p sP \P \0 \P yO \0 vO \0 \0 \0
0\ QS. o\ o\ QV. o\ 0s"-	0s. o\ (JS OS. OS OS o\ cJs oS OS OS o\

OLnOLnOLnOLDOLnoLnOLnOLnoLnOLn
*H*HfN(Nrriro^-^-LnLnii)i£ir-r--ooooaiai

Flow-Exceedance Percentiles

Figure 9. Flow duration curve with MS4 control of 100% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and historic climate conditions (Scenario 3).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.21 cfs (49.1 MG/year)
Developed, with BMPs Ecosurplus: 1.94 cfs (457.7 MG/year)

Flow-Exceedance Percentiles

Figure 10. Flow duration curve with MS4 control of 30% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and future climate conditions (Scenario 4).

6


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

i/>

H-

10

5
o

0.1

0.01

i—i—i—i—i—r

n—i—i—i—i—r

n—i—i—i—i—i—i—i—i—i—r

\0
cN

O

SP
0s-

lh

SP
o>
O

SP
o^-
LO

xO

cN

o

rsj

sP

o\
LO
r\j

sP
cN

o
m

sP
LO
m

sP
cN

o

<3-

\°
0s-

m
<3-

SP
0s-

O
LO

VP
Q\

LH
LO

o

nP
LO
UD

sP
o\

o

r-.

o\
LH

r-.

SP
o\

o

CO

Np	sP

cN	o\

LO	O

00	CT>

•sP
o\
LO
CT>

Flow-Exceedance Percentiles

Figure 11. Flow duration curve with MS4 control of 80% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and future climate conditions (Scenario 4).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

to

<4-

V, 10

5
_o

LL.

1

0.1

0.01

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.10 cfs (23.6 MG/year)
Developed, with BMPs Ecosurplus: 1.82 cfs (429.7 MG/year)

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.07 cfs (16.2 MG/year)
Developed, with BMPs Ecosurplus: 1.78 cfs (420.8 MG/year)

Flow-Exceedance Percentiles

Figure 12. Flow duration curve with MS4 control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 4).

7


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

0.01

\0
cN

o

SP

0s-

lh

SP
o>
O

n—i—i—i—i—r

SP
o^-
LO

xO

cN

o

rsj

sP

o\
LO
r\j

sP
cN

o
m

n—i—i—i—i—r

SP
0s*
LO
ro

sP
cN

o

<3-

\°
m
<3-

SP
0s-

o

LO

VP
Q\

LH
LO

o

nP
LO
UD

sP
o\

o

r-.

n—i—i—i—i—i—i—i—i—i—r

o\
LH

r-.

SP
o\

o

CO

Np	sP

cN	o\

LO	O

00	CH

•sP
o\
L0
CT>

Flow-Exceedance Percentiles

Figure 13. Flow duration curve with MS4 control of 30% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and historic climate conditions (Scenario 5).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.9 MG/year)
Developed, with BMPs Ecosurplus: 1.92 cfs (452.3 MG/year)

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 1.90 cfs (447.9 MG/year)

Flow-Exceedance Percentiles

Figure 14. Flow duration curve with MS4 control of 80% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and historic climate conditions (Scenario 5).

8


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

0.01

\0
cN

o

SP

0s-

lh

SP
o>
O

n—i—i—i—i—r

SP
o^-
LO

xO

cN

o

rsj

sP

o\
LO
r\j

sP
cN

o
m

n—i—i—i—i—r

SP
0s*
LO
ro

sP
cN

o

<3-

\°
m
<3-

SP
0s-

o

LO

VP
Q\

LH
LO

o

nP
LO
UD

sP
o\

o

r-.

n—i—i—i—i—i—i—i—i—i—r

o\
LH

r-.

SP
o\

o

CO

Np	sP

cN	o\

LO	O

00	CH

•sP
o\
L0
CT>

Flow-Exceedance Percentiles

Figure 15. Flow duration curve with MS4 control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and historic climate conditions (Scenario 5).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

to

<4-

V, 10

5
_o

LL.

1

0.1

0.01

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 1.89 cfs (446.6 MG/year)

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.18 cfs (41.9 MG/year)
Developed, with BMPs Ecosurplus: 1.91 cfs (450.4 MG/year)

Flow-Exceedance Percentiles

Figure 16. Flow duration curve with MS4 control of 30% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and future climate conditions (Scenario 6).

9


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.05 cfs (11.7 MG/year)
Developed, with BMPs Ecosurplus: 1.76 cfs (416.3 MG/year)

Flow-Exceedance Percentiles

Figure 17. Flow duration curve with MS4 control of 80% of the Upper Hodges Brook subwatershed's impervious cover
under future LULC and future climate conditions (Scenario 6).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.02 cfs (4.1 MG/year)
Developed, with BMPs Ecosurplus: 1.72 cfs (406.9 MG/year)

Flow-Exceedance Percentiles

Figure 18. Flow duration curve with MS4 control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 6).

10


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development



































Developed,















































no Divirs tcoaeTicit: u.uu cts (u.u iviu/yearj

















































Developed, no BMPs Ecosurplus: 2.18 cfs (515.0 MG/year)







































Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)













































Developed, with BMPs Ecosurplus: 2.17 cfs (511.8

MG/year)

















































































J=

—

—

—

—

—

—

=

—

—

—

—

—

=

—

—

—

—

—

—

—

—

—

—

—

—

=

—

—

	



-

—



















—

—

—

—

=

-



















































































































































—























































































































































































































1





























































































\0 >nO \0 \0 \0 yO vO sp \0 \p sP \P \0 \P yO \0 vO \0 \0 \0
0\ QS. o\ o\ QV. o\ 0s"-	0s. o\ (JS OS. OS OS o\ cJs oS OS OS o\

OLnOLnOLnOLDOLnoLnOLnOLnoLnOLn
*H*HfN(Nrriro^-^-LnLnii)i£ir-r--ooooaiai

Flow-Exceedance Percentiles

Figure 19. Flow duration curve with HIGH control of 30% of the Upper Hodges Brook subwatershed's impervious
cover under historic LULC and climate conditions (Scenario 7).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, no BMPs Ecosurplus: 2.18 cfs (515.0 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 2.15 cfs (508.1 MG/year)

Flow-Exceedance Percentiles

Figure 20. Flow duration curve with HIGH control of 80% of the Upper Hodges Brook subwatershed's impervious
cover under historic LULC and climate conditions (Scenario 7).

11


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

Developed, no BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, no BMPs Ecosurplus: 2.18 cfs (515.0 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 2.14 cfs (505.9 MG/year)

10

5
o

0.1

0.01

t—i—i—i—i—i—i—i—i—i—r

\0	\0	v. O	\0	\0	\o	\p	\0	\p	vO	\U	\0	\0	\0	\U	\0	\0	so	vO	\0

os o\ oS. OS oX- o\ cJS. oS. o\ o\ o\ qS. o\ OS oS OS oS (Js OS oS

OLnOLnOLnOLDOLnoLnOLnOLnoLnOLn
*H*HfN(Nrriro^-^tLnLnii)i£ir-r--ooooaiai

Flow-Exceedance Percentiles

Figure 21. Flow duration curve with HIGH control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under historic LULC and climate conditions (Scenario 7).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

Developed, no BMPs Ecodeficit: 0.22 cfs (52.3 MG/year)
Developed, no BMPs Ecosurplus: 1.38 cfs (326.5 MG/year)
Developed, with BMPs Ecodeficit: 0.10 cfs (24.1 MG/year)
Developed, with BMPs Ecosurplus: 1.24 cfs (293.6 MG/year)

^ 10

5
o

0.1

0.01

Flow-Exceedance Percentiles

Figure 22. Flow duration curve with HIGH control of 30% of the Upper Hodges Brook subwatershed's impervious
cover under historic LULC and future climate conditions {Scenario 8).

12


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs

0.1

Pre-Development

Developed, no BMPs Ecodeficit: 0.22 cfs (52.3 MG/year)
Developed, no BMPs Ecosurplus: 1.38 cfs (326.5 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.3 MG/year)
Developed, with BMPs Ecosurplus: 1.11 cfs (262.3 MG/year)

Flow-Exceedance Percentiles

Figure 23. Flow duration curve with HIGH control of 80% of the Upper Hodges Brook subwatershed's impervious
cover under historic LULC and future climate conditions (Scenario 8).

o.i

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

Developed, no BMPs Ecodeficit: 0.22 cfs (52.3 MG/year)
Developed, no BMPs Ecosurplus: 1.38 cfs (326.5 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.2 MG/year)
Developed, with BMPs Ecosurplus: 1.10 cfs (259.4 MG/year)

Flow-Exceedance Percentiles

Figure 24. Flow duration curve with HIGH control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under historic LULC and future climate conditions {Scenario 8).

13


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.1 MG/year)
Developed, with BMPs Ecosurplus: 1.91 cfs (450.2 MG/year)

10

5
o

0.1

0.01

t—i—i—i—i—i—i—i—i—i—r

\0	\0	v. O	\0	\0	\o	\p	\0	\p	vO	\U	\0	\0	\0	\U	\0	\0	so	vO	\0

os o\ oS OS oS o\ cJS. oS. o\ o\ o\ qS. o\ OS oS OS oS (Js OS oS

OLnOLnOLnOLDOLnoLnOLnOLnoLnOLn
*H*HfN(Nrriro^-^tLnLnii)i£ir-r--ooooaiai

Flow-Exceedance Percentiles

Figure 25. Flow duration curve with HIGH control of 30% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and historic climate conditions (Scenario 9).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

^ 10

5

O

0.1

0.01

o\

o

VP
os

LO

NO

oV
O

so
os

o

CsJ

SO
0s"
LO

rsj

sp sp SP SP

OS OS OS OS

O LO o LO

so
o\

o

LO

SO	sp

os	os

LO	O

LO	UD

SO
OS

LO
UD

O

Is*

sP

oS

LO
rs

sp

OS

o

00

sp
OS

LO
00

so

OS

o

0>

OS

LO

cr>

Flow-Exceedance Percentiles

Figure 26. Flow duration curve with HIGH control of 80% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and historic climate conditions (Scenario 9).

14


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

0.01

\0
cN

o

SP

0s-

lh

SP
o>
O

n—i—i—i—i—r

SP
o^-
LO

xO

cN

o

rsj

sP

o\
LO
r\j

sP
cN

o
m

n—i—i—i—i—r

SP
0s*
LO
ro

sP
cN

o

<3-

\°
m
<3-

SP
0s-

o

LO

VP
Q\

LH
LO

o

nP
LO
UD

sP
o\

o

r-.

n—i—i—i—i—i—i—i—i—i—r

o\
LH

r-.

SP
o\

o

CO

Np	sP

cN	o\

LO	O

00	CH

•sP
o\
L0
CT>

Flow-Exceedance Percentiles

Figure 27. Flow duration curve with HIGH control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and historic climate conditions (Scenario 9).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 1.88 cfs (442.9 MG/year)

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.15 cfs (36.0 MG/year)
Developed, with BMPs Ecosurplus: 1.88 cfs (443.0 MG/year)

Flow-Exceedance Percentiles

Figure 28. Flow duration curve with HIGH control of 30% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 10).

15


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

0.01

n—i—i—i—i—r

~i—i—i—i—i—r

~i—i—i—i—i—i—i—i—i—i—r

\0
cN

O

SP

0s-
LO

sP
cN.

O

SP

0s-
LO

xO

cN

o

rsj

sP

o\
LO
r\i

sP
cN

o
m

sP
0s-
LO
ro

sP
cN

O

\°
0s-

<3-

sP
0s-

o

LO

SP

Q\

LO
LO

0s-

o

nP
0s
LO
UD

0s-

o
r--

0s-
LD

r-.

SP
0s-

o

CO

\0	sP

0s-	o\

LO	O

00	CT>

•sP
o\
LO
CT»

Flow-Exceedance Percentiles

Figure 29. Flow duration curve with HIGH control of 80% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 10).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.01 cfs (1.3 MG/year)
Developed, with BMPs Ecosurplus: 1.70 cfs (402.1 MG/year)

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.2 MG/year)
Developed, with BMPs Ecosurplus: 1.69 cfs (397.9 MG/year)

Flow-Exceedance Percentiles

Figure 30. Flow duration curve with HIGH control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 10).

16


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

0.01

\0
cN

o

SP

0s-

lh

SP
o>
O

n—i—i—i—i—r

SP
o^-
LO

xO

cN

o

rsj

sP

o\
LO
r\j

sP
cN

o
m

n—i—i—i—i—r

SP
0s*
LO
ro

sP
cN

o

<3-

\°
m
<3-

SP
0s-

o

LO

VP
Q\

LH
LO

o

nP
LO
UD

sP
o\

o

r-.

n—i—i—i—i—i—i—i—i—i—r

o\
LH

r-.

SP
o\

o

CO

Np	sP

cN	o\

LO	O

00	CH

•sP
o\
L0
CT>

Flow-Exceedance Percentiles

Figure 31. Flow duration curve with HIGH control of 30% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and historic climate conditions (Scenario 11).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.1 MG/year)
Developed, with BMPs Ecosurplus: 1.90 cfs (448.2 MG/year)

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 1.88 cfs (442.6 MG/year)

Flow-Exceedance Percentiles

Figure 32. Flow duration curve with HIGH control of 80% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and historic climate conditions (Scenario 11).

17


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

100

10

Developed, no BMPs Ecodeficit: 0.09 cfs (22.4 MG/year)
Developed, no BMPs Ecosurplus: 2.01 cfs (475.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.0 MG/year)
Developed, with BMPs Ecosurplus: 1.87 cfs (441.3 MG/year)

0.1

0.01

cN

O

SP

0s-
LO

sP
o>
O

n—i—i—i—i—r

SP

0s-
LO

xO

cN

o

rsj

sP
o\
LO
r\j

sP
cN

o
m

n—i—i—i—i—r

SP
0s-
LO
ro

sP
cN

o

<3-

\°
0s-

<3-

sP
0s-

O

LO

VP
0s-
LO
LO

0s-

o

nP
0s
LO
UD

0s-

o
r--

n—i—i—i—i—i—i—i—i—i—r

0s-

ln
r-.

SP
0s-

o

CO

\0	sP

0s-	o\

LO	O

00	CH

•sP
o\
L0
CT»

Flow-Exceedance Percentiles

Figure 33. Flow duration curve with HIGH control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and historic climate conditions (Scenario 11).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.11 cfs (26.1 MG/year)
Developed, with BMPs Ecosurplus: 1.83 cfs (432.3 MG/year)

Flow-Exceedance Percentiles

Figure 34. Flow duration curve with HIGH control of 30% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 12).

18


-------
FDC 2A Project

Appendix D

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.2 MG/year)
Developed, with BMPs Ecosurplus: 1.68 cfs (397.0 MG/year)

Flow-Exceedance Percentiles

Figure 35. Flow duration curve with HIGH control of 80% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 12).

	Developed, no BMPs 	Developed, with BMPs 	Pre-Development

0.1

1 1

xO

cN

1 1 1

Np

cN

I I
cN

1 1 1
cN

1 i

Np
ON

1 1 1

\0
ON

i i

NO

OS

i i i

Np

cN

1 I

NO
ON

1 1 1

Np
ON

1 1

xp

ON

1 1 1

Np
ON

1 1

Np
ON

1 1 1

Np
ON

i i

Np
ON

i i i

Np
ON

1 1

Np
ON

1 1 1

Np
ON

1 1 1

Np
ON

Lf>

O

LO

O

LO

O

LO

O

LO

o

LO

O

LO

O

LO

o

LO

O

LD



T—1

tH

rN

fN

m

m





LO

LO



UD

r-



00

00

G)

CD

Flow-Exceedance Percentiles

Figure 36. Flow duration curve with HIGH control of 100% of the Upper Hodges Brook subwatershed's impervious
cover under future LULC and future climate conditions (Scenario 12).

Developed, no BMPs Ecodeficit: 0.29 cfs (68.0 MG/year)
Developed, no BMPs Ecosurplus: 2.03 cfs (479.1 MG/year)
Developed, with BMPs Ecodeficit: 0.00 cfs (0.2 MG/year)
Developed, with BMPs Ecosurplus: 1.67 cfs (393.4 MG/year)

19


-------