Located at the south-western area of University of Illinois at Urbana-Champaign, the site
is part of the UIUC Research Park. Despite its noticeable location near the State Farm Center
arena and the iHotel (the university's official hotel), the area remains an unappealing space
because of lack of canopy shade and plant diversity as well as an discontinuous pathway. The
runoff from unutilized fields and impervious parking lots is discharged directly to the existing
retention pond that is connected to the Embarras River, a waterway beginning in
Urbana-Champaign. This runoff has high concentrations of phosphorus, nitrogen, and
suspended solids, and eventually leads to the Gulf of Mexico where these contaminants harm
its rich ecosystem and create a large deadzone where dissolved oxygen is minimal.

"Celebration of Raindrops: An Innovative, Interactive Approach to Rainwater
Management" is designed to remedy those problems and to provide a space where students,
staff and visitors all can enjoy the interaction with nature and learn more about green
infrastructure. The design proposal consists of a constructed wetland, several
retention/recreation ponds, a rain garden, experimental farmland, and the transformation of an
abandoned silo into a water center. Tying these features together are a rainwater treatment and
purification system, a clean water recycling and redistribution system, as well as a greenway
system. Furthermore, our project can assist in achieving the University's Illinois Climate Action
Plan (iCAP) goal of achieving long-term carbon neutrality by providing an infill design example
at underutilized open space.

Team Members

Jingjing Xu- Master of Sustainable Urban Design, Master of Architecture

Yuqing Liu- Master of Landscape Architecture

Will Napier- Master of Landscape Architecture

Chenfei Cai- Master of Landscape Architecture

Sichen Li- Master of Landscape Architecture

Jianing Zhao- Master of Landscape Architecture

Jianming Li- Master of Landscape Architecture

Tonia Andreina- Master of Landscape Architecture

Matthew Andre Krauss- Civil and Environmental Engineering

Aditi Chockalingam- Civil and Environmental Engineering

Arannya Roy- Civil and Environmental Engineering

Faculty Advisors

Professor Arthur R. Schmidt, P.E., Department of Civil and Environmental Engineering
Professor Jie Hu, PLA, Department of Landscape Architecture


-------
Project Context

The site is part of the UIUC Research Park, which
is positioned for continuous expansion on campus.The
growth reinforces the need for a demonstration project that
addresses the critical issues of: land use, circulation,
infrastructure, parks and recreation. We chose the
underutilized area in the north-east block of the research
park as our site, to create a distinct identity and to
enhance a sense of place for the Research Park and to
reinforce its connection with the campus core.

The study area is 50 acres including the
surrounding buildings and parking lots while the site of the
project is 15 acres. In the north of our site, there is State
Farm Center, the third largest Illinois arena, which holds games and conferences every season.
The iHotel and conference center are located in the west of the site, providing services for every
Illinois game day, alumni reunion, wedding, celebration, community event, or staff meeting. The
other buildings inside the study area are office buildings and research labs. A large greenhouse
on the east of Fourth Street is operated by a crop research lab across the street.

In terms of topography, our site is situated on
a ridge line that divides the whole campus into
two watersheds. The rainwater runoff of the
study area will be drained to the East Branch
of the Embarras River floodplain to the South.
The flow of nitrogen and phosphorus from
nearby farms and untreated wastewater into
the Embarras River, part of the greater
Mississippi River watershed, contributes to
the growing hypoxic zone in the Gulf of
Mexico.

Site Analysis

A number of problems and some advantages are presented based on several site visits
and interviews with local users. The large area of impermeable paving for parking lots and the
lack of tree canopy in the study area creates heat island effects that make the site measurably
warmer than surrounding areas on summer days. Combined with soil types that have a high
runoff potential, there are serious environmental factors to consider.

The majority of the site, adjacent to beautiful farmland to the east, is not accessible to
bikers and pedestrians. The existing retention pond is a great place for relaxation and
recreation, according to Benjamin, a manager who works in the crop research lab, however,
there are no few amenities to enjoy there. The pathway around the retention pond is not
connected or continuous. Furthermore, it is difficult for Benjamin to check on the greenhouse to
the east of Fourth Street after working in the research lab across the street because there is no


-------
pedestrian crossing. The Research Park is bisected by
Fourth Street, which has led to inefficient and dangerous
pedestrian circulation.

In addition, the rainwater on our site is discharged
directly to the existing retention ponds, which smell bad on
rainy days, especially due to the service vehicles of the
iHotel and the abandoned silo to the north. The majority of
the rainwater management system is closed and buried so
that visitors have little knowledge or awareness about the
process and green infrastructure.

Local Acts and Plans

Several current local regulation acts and action plans apply to the site. The City of
Champaign requires all new development and redevelopment to provide for rainwater detention
on site and drainage designs that minimize impervious surfaces, attenuate flows via open
vegetated swaies, and preserve natural waterways.

The Illinois Nutrient Loss Reduction Strategy, developed by the Illinois Environmental
Protection Agency, Illinois Department of Agriculture, and University of Illinois Extension
proposes and helps implement measures to improve water quality in the region and
downstream by reducing nitrogen and phosphorus levels in runoff, promoting sustainable
agricultural practices such as cover crops and reduced fertilizer application, and the installation
of green infrastructure features like green roofs and green urban rainwater practices like street
sweeping and leaf collection.

The University has approved two landmark plans that affect our design: the Illinois
Climate Action Plan (iCAP) and the Resilient Landscape Strategy. iCAP sets sweeping
sustainability goals for the entire campus, including becoming carbon neutral by 2050.
Furthermore, it sets several nearterm land and water management goals, including: reducing
the campus's use of potable water by 40% by 2030; doubling pollinator-friendly spaces by 2024;
and, doubling green infrastrastructure installations by 2024.

The Facilities & Services department approved its Resilient Landscapes Strategies in
2018, which aims to make the campus an exemplar of resilient rainwater management. It
recommends the addition of bioinfiltration cells with native plantings and bioswales for parking
lots and roadways; increasing tree planting; and, rainwater harvesting. It also places emphasis
on community education surrounding rainwater management to increase awareness and
participation in campus stewardship.

The current master plan for the Research Park recommends infill development and that
new development be clustered around rainwater management facilities and be right-sized to
discourage excessive parking, reducing impervious surfaces and the heat island effect.

Project Goals

The goal of this project is to provide a dynamic, sustainable, and innovative space for the
local community, to set an example for future infill development on campus, and to advocate for
sustainability and green infrastructure worldwide. We identified six design objectives to address
social, environmental, and economic concerns:


-------
1.	Reduce rainwater runoff arid prevent flooding

2.	Improve water quality of the Embarras River

3.	Reduce potable water consumption

4.	Improve plant diversity and enhance the broader ecosystem

5.	Increase accessibility to green space

6.	Educate students, staff, and visitors about sustainability and green infrastructure

7.	Provide an aesthetic, accessible, and continuous space for relaxation and recreation

Design Solutions

The design is composed of six zones to provide a dynamic experience on the site:
Terraced Wetlands, Central Lake, Hook Pond, Mediation Garden, Education Farmland and an
Aquatic Tower. Several green infrastructures have been implemented in the six zones to create
an innovative, interactive approach for rainwater management. To achieve the design
objectives, we propose four strategies:

1. Greywater Treatment and Purification System

The greywater treatment and purification system makes use of the existing topography
of the site and purifies the rainwater collected from surrounding building roofs and parking lots
by plants in a multi-step system consisting of a constructed wetland, several retention and
recreation ponds, and a rain garden.

1.1 Terraced Wetlands

Located in the northern section of the
site, Terraced Wetland is a constructed wetland
that uses natural processes involving wetland
vegetation, soils, and their associated microbial
assemblages to improve water quality. The site
topography gradually decreases from north to
south, with three small curved pools of water
distributed along the main roadway of the site.

Rainwater is collected in this pool and then
flows downward with the topography. The
rainwater is purified by layers of wetland plants between the steps by the wetland plants, flows
into a circular strip pond in the middle of the wetland, which then converges into an oval-shaped
pond.

On the north side of the circular pond, three large, curved steps are set up, which are hidden
among the wetland plants. In the center of the circular band pond is a stage on which people
can perform or conduct group activities. To the south of the oval-shaped pool, shorter curved
steps are set up on which visitors can sit and view the landscape. The pond and wetland plants,
the stage in the middle of the site, and the water tower form a richly layered picture for visitors.
At the southeast corner of the constructed wetland is a landscape bridge that connects the
constructed wetland to the Vegetated Bioswale, giving the entire site a sense of unity. At the
same time, the bridge adds to the visitor experience.


-------
1.2	Central Lake

Central Lake redesigns the edges of the existing
retention pond on site to connect with Terraced Wetlands and
Hook Pond. Two weirs slow the flow from Terraced Wetlands
before entering Central Lake. An open, vegetated bioswale
extends from the large parking lot of the iHotel's conference
center allowing runoff to flow into the main basin between the
weirs, trapping sediment, suspended particles, and debris.

West of these weirs a tallgrass prairie buffer strip provides
similar functions for parking lot runoff not channelled into the
bioswale.

Surrounding Central Lake is a loop pathway which connects to the broader greenway
system, with two bridges crossing the streams that connect it to Terraced Wetlands to the north
and Hook Pond to the south. The path widens south of the tallgrass prairie strip to form a plaza
with two large planters with trees fitted with seat walls facing the water. Between the path and
the water's edge is densely planted wetlands, cleaning the water and creating vital aquatic
habitat. Together the plantings in this section of the design are evocative of the two dominant
ecosystems in the region: wetland and prairie.

Just off the path on all sides of Central Lake are three sunken, outdoor classrooms,
which can be used for educational events, social functions or casual enjoyment. The floor of
each classroom is two feet below grade, creating enough depth for a built-in seat hugging the
perimeter, inviting visitors to view their surroundings from a new perspective, closer to the earth
and water. Their shape is reminiscent of the organic flow of water drops, echoing the central
theme of the design.

1.3	Hook Pond

Hook Pond functions as both a recreation pond and part of the larger rainwater reuse
system. After a series of rainwater treatments, clean water resources will be collected in the
recreation pond and transformed into the water features. The water feature in this area includes
a small crescent-shaped pool and a large pea-shaped pool.

The recreational pool area has three main activity spaces: a wetland park, terraced
seating and a fishing platform. The wetland park is mainly for leisure walks and wetland plants
exploration. Terraced seating creates a relaxing space to enjoy the tranquility of the
surroundings. The stocked pool is located on the south side of this section where visitors can
bring their own tools or rent here to enjoy the fun of fishing.

As part of the rainwater management system, the recreation pond has plans for different
water levels in this area, marked by two edges. Between these two edges is a square marked
with pebbles. When the water level is low, the square will be exposed. People can touch the
treated water in the square and feel the effects of water treatment while having fun. When the
water volume is large, this square will be submerged and become a part of the pool, increasing
the pool's capacity. Visitors can reach the lakeside square through the trail surrounded by plants
and rest on the seats beside the flower beds. After large storm events when the water volume
exceeds the capacity of the ponds, it will be discharged into the pond of Education Farmland
across Fourth Street to the east.


-------
1.4	Mediation Garden

Mediation Garden consists of a vegetated bioswale and bioretention cell. It is a channel
designed to concentrate and transport rainwater runoff while removing debris and pollution. It is
also conducive to recharging groundwater. Vegetation reduces the flow rate of water and
facilitates treatment and infiltration. Meditation Garden will treat runoff from the nearby roadway
and parking lot.

The roughly four acre bioswale is located east of Fourth Street and north of the
greenhouse. A large amount of car pollution is deposited on the sidewalk and washed away by
the first flush of rain. The bioswale in the project is created at the edge of the parking lot to
capture and treat rainwater runoff, and then release it to Education Farmland.

The bioswale is designed to safely maximize the retention time of water in depressions, which
helps to collect and remove pollutants, silt, and debris. Therefore, bioswale is designed to be
zigzagged according to the site terrain. In depressions with gentle slopes (less than 6%),
permeable materials (such as decomposed granite) are laid and gabion parapets are set along
it. Various water-loving plants are planted in the depression, including spiderwort, mountain
mint, ostrich fern, golden Alexander, red chokeberry, high bush cranberry, New Jersey tea, and
blue flag iris. These deep-rooted native grasses and forbs can enhance water infiltration, cooling
and purification to improve water quality.

A 100-yard long winding wooden plank road runs through the whole bioswale area,
connecting Terraced Wetlands to the west and Education Farmland to the south. The wooden
plank road is supported by wooden columns, more than a foot and a half above the ground. To
the east of the wooden plank road, three wooden platforms of different heights are set up as
open air yoga venues.

1.5	Education Farmland

Education Farmland is a living education center, providing visitors an opportunity to learn
about food production and sustainable living. It comprises four zones, including a rain garden,
orchard, planting garden, waterfront plaza.

The entrance is a rain garden, capturing and infiltrating rainwater runoff. It is also easy to
maintain. There are several native and water-tolerant plants, such as switchgrass, green
bulrush, golden Alexanders, culver's root, wild senna, wild bergamot, sweet coneflower, and
New England aster. These plants can attract a variety of birds, butterflies, and small mammals.
The orchard is located at the northwest corner. There are several fruit trees and shrubs,
including persimmon, dwarf apple, peach, and black chokeberry. These trees are not only
ornamental, but their fruits are edible. Visitors can participate in the whole production process.
The center of the education farmland is the planting garden. Visitors are encouraged to plant
produce in the long plant beds by themselves. The garden uses a drip irrigation system to
irrigate the farmland.

The waterfront plaza, next to the planting garden is ideal for lectures or workshops.
Visitors can sit at seats around the plaza to participate. They can learn about plants, animals,
ecosystems, agriculture, food production, and water management. There is also a bridge
connected to the plaza where visitors can enjoy the view of the retention pond to the south.
To achieve the design goals, the lawn uses the drought-tolerant tall fescue to reduce the need
for irrigation. The planting garden uses the permeable decomposed granite as the pavement


-------
material. In addition, a mulch layer was applied to the bare soil surface to reduce water
transpiration.

2. Clean Water Recycling and Redistribution

2.1 Off-Site Water Tower

This design contains a complete water circulation system, including water delivery,
purification, irrigation, and filtration. The system begins at a lake approximately 5,000 feet
southwest of the site at the headwaters of the Embarrass River. It has a water level of about 710
feet above sea level and holds about 482,000 cubic feet of water.

Our design proposes a 130-foot tall water tower be built adjacent to the lake to store
runoff from campus before it reaches the river. At this height, it will be taller than the Aquatic
Tower on-site, allowing water to be transported to the Aquatic Tower by atmospheric pressure
and gravity through underground pipes. According to NOAA, Urbana-Champaign has an above
average annual wind speed; therefore we propose a wind turbine be installed to pump the water
from the water tower to the Aquatic Tower.

2.1.2 The Aquatic Tower

The core node of the whole water circulation system is the proposed Aquatic Tower,
reimagining the existing, abandoned silo as a water purification system, complete with aquarium
and outdoor landscape design. The 71-foot tall Aquatic Tower is located at a regional high point
(769 feet above sea level) along the ridge that separates the broader campus into two
watersheds, and has a maximum storage capacity of about 60,200 cubic feet. Water from the
water tower along the lake will be pumped into the Aquatic Tower by pressure, where it is
purified and stored. Then, the water will be distributed to the site and surrounding areas for
irrigation. Any runoff from the site will be initially filtered by surface vegetation and eventually be
collected in the lake downhill and the cycle will start anew.

Viewing Platform

Section View of Aquatic Tower


-------
The building is divided into two sections: north and south. The southern section of the
building is about 71 feet tall and contains six purification tanks. The lake water enters the most
southern two water storage tanks at first, undergoing sand filtration, then algae filtration in the
next two, and finally protein separation before it enters the aquarium in the north section. The
southern section includes three indoor floors and two outdoor floors. The entrance of the interior
ground floor is located on the south side of the building, with two exits facing east and west.
These exits connect to an outdoor staircase to improve the connection between the interior and
exterior circulation for visitors. The purification tanks are made with glass walls and form a
corridor from which visitors can observe the different stages of the water purification process.

The second interior floor of the southern part functions as the maintenance room with
tanks mirroring the floor below. Both sides of the water tank feature maintenance entrances,
ladders and pipeline for easy maintenance and repair. This floor is for employees only and the
entrance is located on the third floor of the building. The third interior floor is located above the
six water purification tanks. Its function is an electrical control room and has staircases leading
to the second floor. This floor is for employees only as well.

The first outdoor floor sits over the six purification tanks and is about 41.9 feet high. This
floor functions as an outdoor sitting space with tables and chairs, and an outdoor staircase on
the east side leads to a roof garden on the north. Along the eastern guardrail, is a large green
wall. The entrance to the third interior floor is also on this floor. The second outdoor floor is 71
feet high, built above the electrical control room. This floor functions as a viewing platform,
which is the highest point of the site and provides a bird's eye view of the whole site.

The northern part of the water tower is 25.6 feet high and is divided into two indoor floors
and one outdoor floor. The interior part is enclosed by 8 water storage tanks that are
transformed into aquariums. The water inside the aquarium is purified water, which will be


-------
enriched by raising ornamental fish and then used for irrigation in the surrounding area. The
entrance to the lobby on the interior ground floor is on the north side, while a corridor connects
the lobby to the southern part. The second floor of the building is a circular corridor, with two
entrances on the east and west sides connecting with the outside. There is no indoor staircase
between the first and second floors, but is connected by two outdoor staircases. The interior
roof is designed as a glass dome.

The outdoor floor of the northern part is a roof garden 25.6 feet above ground level. The
green roof is centered around the glass dome surrounded by an ornamental pool that is not
directly connected with the indoor aquarium. Visitors can reach the site via an outdoor staircase
or continue to the upper viewing platform to the south. Since the windmill at the starting point of
the water circulation system is far from the site, there are four ornamental micro-windmills in the
green space of the roof garden. They are used to indicate that the water circulation system of
the water tower is driven by the green energy of wind.

2.2 Drip irrigation

Drip irrigation "provides slow, even application of low-pressure water to soil and plants
using plastic tubing placed in or near the plants' root zone" (Shock, 2013). The use of drip
irrigation systems in design is for more efficient use of water. Drip irrigation systems are
carefully planned for each step in irrigation to maintain the needs of crops or plants.

The existing irrigation system on site is a sprinkler system, which will be replaced with a new
drip irrigation system in our design. The major differences between the drip and sprinkler
irrigation systems are listed below:



Drip Irrigation

Sprinkler Irrigation

Cost

Dripping valves and pipe - More expensive
(Beginning) & Save water - Cheaper (Future)

Spray guns and nozzles - Cheaper (Beginning) &
Waste water - More expensive (Future)

Application Method

Set system requires an investment of time and
energy - Harder

Set the watering time - Easier

Coverage

Only wets the root area

Cover large areas

Uneven or Even
Watering

Irrigate every plant individually - Even

The closer to the sprinklers, the more water will plant
get - Uneven

Water Efficiency

Extremely make use of accessible water -
Maximum efficiency

Waste as much as 80% of the water - Low efficiency

Irrigation Depth

Irrigate the plants slowly and allow the soil
more time to soak water - Deeper watering

Spread out the water to a large surface area - Don't
penetrate the soil deeply

Risk of Invasive
Weeds

Low

High

Plant Disease

Deeper and slower watering makes plants
grow better - Strong and healthier

Soak the plant - lead the plant easy to get sick

Although drip irrigation can take more time and effort at first and initial cost is greater
than sprinkler systems, it makes more efficient use of water, controls weeds, helps plants grow,
reduces disease, and increases yields in the long-term, making it worth the extra effort and cost.


-------
3.	Greenway System

The existing conditions of the site relegate visitors to sidewalks parallel to the major
thoroughfares despite ample open greenspace on the site. The site's design for a connected
greenway enhances the campus's existing bikeways, promotes non-carbon transportation, and
physical exercise.

3.1	Loop

A continuous loop connects the various features of the design with permeable
decomposed granite paths, wooden platforms, and bridges. This will invite visitors to explore all
aspects of the educational aspects of the rainwater management design as well as provide
useful multimodal connections to important nodes on the site.

3.2	Elevated Corridor

One of the most visible and exciting parts of the loop is the elevated corridor stretching
over Fourth Street, connecting Terraced Wetland and Meditation Garden. It will provide a safe,
accessible alternative to crossing the busy throughway and will double as a landmark for the
site.

3.3	Waterfront Plaza

A large plaza northwest of Central Lake will create an events space integrated into the
landscape design of the site. While allowing for continuous circulation along the larger greenway
and a secondary loop around Central Lake, the plaza, combined with satellite sunken
classrooms, provides space for various social and educational functions.

3.4	Riverfront Platform

The riverfront platform in Meditation Garden, situated between Education Garden to the
south and the elevated corridor to Terraced Wetland provides not only a unique vantage point
from which to view aquatic flora and fauna but also a serene space for outdoor yoga practice.

4.	Public Education

The Research Park is home to high quality projects from many fields and is itself a
showcase for innovation. Its location next to the iHotel and State Farm Center means there is a
large influx of visitors to the site on a regular basis. The site design includes a signage system
that will clearly show visitors where the relevant educational resources are located. At the same
time, the educational site will not only provide visitors with an offline real experience, but also
extend the dissemination of knowledge online. Through an associated online app, visitors will be
able to browse the educational resources even after they return home.

4.1	Sunken Classrooms

This classroom provides an open-air educational space for visitors. Circling Central
Lake, three classrooms with built-in seating create semi-enclosed, semi-private outdoor spaces
for lectures and events as well as casual enjoyment and relaxation. Their unusual vantage point
gives visitors a new appreciation for their surroundings.

4.2	Experimental Farmland

This farmland is a very rich plant resource that encourages people to get involved in the
plant growing process. After the plants mature, flowers, vegetables, fruits, and other related
produce can be provided to the campus dining hall. People can learn the entire process of food
production. At the same time, visitors will also be able to learn about the application of the latest
planting technology here. Besides, the experimental farmland is located at the lowest point of


-------
the site, which is the outlet of the entire water system. Therefore, the site is also a great location
for conducting lectures related to water management.

4.3	Ornamental Garden

The bioswale in Meditation Garden uses a large number of native, flowering, water
tolerant plants. Firstly, the variety of plants makes for a seasonal interest that is different but
very beautiful all year round. Secondly, the large number of flowering plants attracts native
pollinators, including hummingbirds, bees, butterflies, etc., further enhancing the biodiversity of
the site. At the same time, these plants provide habitat for animals. Finally, the bioswale helps to
slow and absorb some of the rainwater runoff, filtering pollutants and sediments through
bioretention. As a result, this garden provides an educational resource for visitors from multiple
perspectives.

4.4	Water Treatment Exhibition

The redesign of the tall concrete corn silo is transformed into a sort of aquarium that
makes water treatment visible to visitors. It is reactivated as the site's landmark, a welcoming
first stop on visitors' educational tour into the Research Park.

4.5	Education Tour

This site offers visitors a rich and unique educational tour. It starts from the Water Center
and ends at the Educational Farmland. Visitors along the water corridor will not only experience
the rich ecological landscape of the riverbank, but also learn about the ecosystem.

gn Performance
Runoff

Rainwater runoff is a major factor when looking at the effectiveness and sustainability of
our site design. As a storm progresses, the rainwater can either infiltrate the soil in manageable
amounts, or cause flooding on a site as it travels across impervious surfaces to an area with
high water concentrations. Most of the improvements we propose will help to reduce runoff
quantities significantly, as they are able to capture the rainwater and use it to enrich the
surrounding ecosystem.

To determine the amount by which runoff is reduced, two preliminary factors had to be
considered: the hydrologic soil group and average rainfall on our site. Hydrologic soil groups
categories soil groups based on their mineral content and runoff/infiltration potentials. The four
groups include group A, B, C, and D, with A having the lowest runoff potential and highest
infiltration potential while D has the highest runoff potential and lowest infiltration potential.

Based on data from the Natural Resources Conservation Service (NRCS) Web Soil Survey, we
concluded that our site is mostly soil group C, suggesting that runoff concentrations are high.
The second factor, average rainfall, was determined using the National Oceanic and
Atmospheric Administration's (NOAA) National Weather Service. The two types of precipitation
events chosen included a 1-year 24-hour precipitation event as well as a 100-year 24-hour
precipitation event. These two storm events were chosen in order to see runoff reduction for a
typical large storm that happens every one year as well as during a major storm that occurs
every 100 years. The average rainfall was calculated to be 6.53 cm for a 1-year 24-hour storm
and 17.5 cm for a 100-year 24-hour storm.

Based on this information, we were able to calculate the change in runoff values for the
two hypothetical storms. The values that were estimated are quite significant, and help reduce


-------
runoff rates by 54% for the 1-year storm and 88% for the 100-year storm. This high reduction in
runoff will help mitigate flooding on the site as well as help with water quality control, another
major factor that we considered on our site.

Runoff Calculations for 1-year 24-Hour Rainfall
BEFORE	AFTER

24-hour hypothetical storm event

Simulated by SLAMM and TR-55 model algorithms

#	Evapotranspiration

#	Runoff
Infiltration

24-hour hypothetical storm event

Simulated by SLAMM and TR-55 model algorithms

#	Evapotranspiration

#	Runoff

Infiltration



6.5



6.0



5.0

E

4.0





"55
>

3.0

.3





2.0



1.0



0.0

Current Conditions

6.5

6.0

5.0
4.0
3.0
2.0
1.0
0.0

Runoff
Partition

Water Depth
(cm)



Water Volume
(m*)

Runoff
Partition

Water Depth
(cm)

Water Volume
(m>)

Runoff



3.410



6,918.96

Runoff



1.563



3,171.23

Evapotranspiration



0.315



639.49

Evapotranspiration



0.349



707.29

Infiltration



2.774



5,628.70

Infiltration



4.588



9,308.64

Runoff Calculations for 100-year 24-Hour Rainfall

BEFORE

24-hour hypothetical storm event

Simulated by SLAMM and TR-55 model algorithms
0 Evapotranspiration
# Runoff
Infiltration

17.5

15.0

10.0

5.0

Current Conditions

AFTER

24-hour hypothetical storm event

Simulated by SLAMM and TR-55 model algorithms

#	Evapotranspiration

#	Runoff
Infiltration



6.5



6.0



5.0

?

4.0

o



"oJ
>

3.0







2.0



1.0



0.0

Modified

Runoff
Partition

Water Depth
(cm)

Water Volume
(m3)

Runoff
Partition

Water Depth
(cm)



Water Volume
(m>)

Runoff

13.503



27,395.17

Runoff



1.563



3,171.23

Evapotranspiration

0.315



639.49

Evapotranspiration



0.349



707.29

Infiltration

3.682



7,469.22

Infiltration



4.588



9,308.64


-------
Water Quality

As rainwater flows across impervious surfaces it picks up harmful pollutants including
fertilizer, pesticides, and motor oil, most of which contain high concentrations of phosphorus and
nitrogen. These nutrients can certainly be beneficial for aquatic ecosystems as they promote the
growth of algae. However, when too much of it enters a stream or lake, the excess algae growth
can disrupt ecosystems and decrease oxygen levels in the water. Cyanobacteria, a blue-green
algae that makes water ways a murky green, can also begin to grow in larger amounts,
disrupting aquatic animals and humans. This is an especially prominent issue in Illinois, a state
dominated by agriculture, as the high concentrations of nitrogen and phosphorus from the
state's waterways eventually ends up in the Gulf of Mexico, one of the most productive
ecosystems in the world. Currently, the largest "dead zone" of hypoxic (low oxygen) water in the
world is in the Gulf, so finding a way to reduce nitrogen and phosphorus levels across Illinois
can greatly help marine life downstream as well here locally.

The inclusion of a vegetated bioswale, water purification system, and a wetlands area,
all help to improve the quality of the water that eventually flows downstream in the Embarrass
River. Through online simulations, we were able to estimate the improvements in water quality
that exist with our design, specifically the changes in nitrogen and phosphorus levels as well as
total suspended solids (TSS).

Water Quality Improvements
BEFORE	AFTER

Total loads delivered in a 24-hour hypothetical storm	Total loads delivered in a 24-hour hypothetical storm

event	event

Simulated by EPA's STEP-L model algorithms	Simulated by EPA's STEP-L model algorithms















Total







Suspended Solids













Suspended Solids







0

20

40

60

80

100



0

20

40

60

80 100

























Nitrogen













Nitrogen









0.0

0.2

0.4

0.6

0.8

1.0



0.0

0.2

0.4

0.6

o

00
o

Total























Phosphorus











	~

Phosphorus









0.0 0.2 0.4 0.6 0.8 1.0	0.00 0.02 0.04 0.06 0.08 0.10

Loading Rate (kg/ha)	Loading Rate (kg/ha)

Quality
Measure

Load
(kg)

Loading

Rate

(kg/ha)

Average

Concentration

(mg/L)



Quality
Measure

Load
(kg)

Loading

Rate

(kg/ha)

Average

Concentration

(mg/L)

Total

Suspended
Solids

825.842

40.706

119.4



Total

Suspended
Solids

383.109

18.884

120.8

Total Nitrogen

18.704

0.922

2.7



Total Nitrogen

8.727

0.430

2.8

Total

Phosphorus

2.401

0.118

0.3



Total

Phosphorus

1.104

0.054

0.3

As seen in the table above, the quality of water is also greatly improved with our design.
There is around a 50% reduction in the total loads of TSS, nitrogen, and phosphorus. If our
design principles and goals were transferred to urbanized sites along the river, there could be
major improvements to local waterways across the state of Illinois, helping to restore the
suffering ecosystem in the Gulf of Mexico.


-------
Carbon Sequestration of Vegetation

Carbon sequestration capacity of vegetation plays an important role in global carbon
emission reduction (Chen, et al., 2020). Due to human activities, the balance of the carbon cycle
has been disrupted. At the same time, the process of urbanization has led to the continuous
reduction of forests and the weakening of vegetation's ability to fix nitrogen. This can lead to a
serious ecological disaster. Therefore, this design will consider the factors that affect the ability
of vegetation to sequester nitrogen in order to increase the rate of carbon sequestration.

Vegetation carbon sequestration is the process by which plants photosynthesize to
absorb carbon dioxide from the atmosphere and store it as carbon in themselves and in the soil.
Trees are the best and most important carbon sinks. When they are destroyed, they lose their
ability to sequester carbon, especially when trees are burned as the absorbed carbon will be
released into the atmosphere. Therefore, when selecting trees for the site, it is important to plant
trees that can grow quickly and survive over time, such as pines, oaks, and sweet gums (Nowak
& Crane, 2002). Woody shrubs and perennial grasses and forbs are also important in increasing
the carbon capture capabilities. Selecting deep-rooted perennials, of which many are native to
Illinois, will also increase carbon sequestration to some extent. The deeper the root system, the
more carbon storage is facilitated.

Reduction in Potable Water

Rainwater is collected and treated in the Aquatic Tower, which holds 60,200 cubic feet of
water, with a daily purification capacity of about 4,000 tons. The water in the purification process
is divided into 4 levels. Among them, Level 4 is unpurified water, Level 3 is initially purified
water, Level 2 is completely purified water and Level 1 is fertilized irrigation water. The campus
is designed to use drip irrigation, so the use of potable water can be reduced. Since toilet water
does not require high quality as portable water, grey water like Level 2 can also be used for
toilets in local buildings. As the highest point in the southern part of the campus, the Aquatic
Tower provides redistributed water for the site and the broader campus which reduces potable
water consumption, saving energy, money and this vital resource.

Canopy Cover

By increasing canopy cover the design offers more seasonal beauty and function, where
trees provide shade in hot months and windbreaks in cold months. An increased canopy also
sequesters more atmospheric carbon while contributing to habitat and food sources for local
wildlife.

Plant Diversity

A diverse plant selection not only extends seasonal interest for visitors' experience of the
site but also ensures that a variety of wildlife can survive and thrive on the site. The plant
schedule prioritizes their bioremediative function and is designed to address a variety of
pollutants. Indiangrass (Sorghastrum nutans) reduces agrochemicals' potency from surrounding
farmland; American wild celery (Vallisneria americana) transforms insecticides in particular;
while lanceleaf frogfruit (Phyla lanceolata) consumes excessive fertilizers that might make their
way through the water system.


-------
Sunflower (Helianthus spp.) and Indian mustard (Brassica juncea) absorb heavy metals
to their roots like magnets. Willows (Salix spp.) clean the water and help transform
petrochemicals into innocuous substances. Cattails (Typha spp.), a quintessential example of a
keystone water species for a variety of wildlife and ecological functions, purifies water while
providing habitat for a variety of organisms in its vast, complicated root systems. The root
systems also help prevent soil erosion and maintain bank stability. Together these plants work to
collaboratively and somewhat passively remediate the site.

Pollinator and Wildlife Diversity

Flora and fauna function in networks or ecosystems. By diversifying the planting
schedule, the integrity of the natural ecosystems will be enhanced and support related wildlife
populations, with each biotic contributor playing their ecologically specialized role. The proposed
design dramatically increases biodiversity on site with emphasis on several different ecosystem
types (wetland, prairie, vegetated bioswales, etc.), which should increase pollinator and wildlife
diversity.

Project Phasi

If the project proposal is approved by the University, the implementation of the design
will take five years. The first year will concentrate on construction drawings based on the
concept we have proposed and the development of an online app for education as well as
advertisement. The first year would also include fundraising efforts, including: applying for
funding from the Student Sustainability Committee at UIUC and finding stakeholders who are
willing to donate money to the project. The second year would focus on constructing the
subterranean piping system for drip irrigation and the drainage system connecting the water
treatment system. In the meantime, utility work needs to be done for the project. The third year
can be used for constructing landform, pathways and bridges, as well as the renovation of the
silo into the Water Center. The following year, trees and other plants can be installed. Finally,
signages can be installed and furniture is provided.

Maintenance Plan

Straightforward and sustainable maintenance is critical to the success of any design
project. Our proposal aims to create an appealing maintenance to amenities ratio for Facilities &
Services at the Research Park.

Constructed Wetlands

By far the most maintenance heavy component of the design, the constructed wetlands
will require constant monitoring of water levels and quality, microbial populations, and soil
quality. Removing sediment buildup regularly will maintain inlet and outlet valve flows as well as
plant and wildlife health. A consistent and slow in- and out-flow will be established to maintain
water quality and reduce bank erosion.

Rain Gardens and Bioswales

These areas should be mowed to roughly three inches in late winter or early spring
before regrowth in order to maintain winter interest for visitors as well as habitat and food


-------
sources for wildlife. After mowing, mulch should be applied to reduce weed growth and maintain
moisture during the growing season.

Farmland

This section will be the most intensively managed, though maintenance would be
incurred by volunteers and those growing food crops. The orchard will require annual pruning to
maximize yields.

Drip Irrigation

While the initial install will be extensive, the maintenance for the drip irrigation system
will occur only twice a year, to check for leaks and water pressure. Filters will be changed at the
same time. Ongoing care will include making sure that the system is covered by soil or mulch,
especially after large storm events.

Pathways and Plazas

The majority of the greenway system is paved with decomposed granite contained by
metal edging. This will need to be relayed annually, ideally in spring, and checked after major
storm events. Plazas are paved with permeable interlocking pavers, which will require
maintenance roughly annually to remove sediment buildup that can reduce their permeability
and encourage vegetation growth and disrupt their stability. The wooden walkways will be
constructed with local bald cypress, a naturally decay-resistant wood, and should require
minimal maintenance for approximately 50 years.

Water Treatment System

The structure of the modified water storage tank is able to cope with the internal water
pressure, and additional frame structures are installed on the building facade to distribute the
pressure and provide support. The corrosion problem is solved by coating the inside of the tank,
which needs to regularly cut off the water supplement for maintenance and renew the coat when
it doesn't rain. The top of each storage tank is provided with a maintenance channel for regular
maintenance. The filter device in the water storage tank for purification needs to be cleaned and
replaced regularly as well, especially when the lake in the south is turbid after heavy rain.

t

This project shows economic benefits from two aspects. Firstly, the green infrastructure
implemented in the proposal qualifies for credit incentive from the City of Champaign. According
to the Stormwater Utility Fee Credit and Incentive Manual of Champaign, there is up to $250
available for our 1.74 acres of vegetated bioswale and rain gardens and up to $750 available for
the retention ponds and wetland and 25% of the construction cost for both of them. Our site
meets the criteria of 100% direct discharge credit because rainwater on our site drains to either
university-owned rainwater pipes or to ditches and creeks not owned by the City.

Furthermore, the project is using drip irrigation with reclaimed rainwater for 8.89 acres of
vegetated bioswales, farmland, and lawn area. Compared to the conventional sprinkler system,
it costs more for installation but saves money in the long-term. Drip irrigation's water efficiency


-------
saves $34 per acre annually, which provides a breakeven time of 25 years. After 25 years, the
cost of drip irrigation becomes lesser than sprinkler irrigation systems.



Drip Irrigation

Sprinkler Irrigation

Installation
costs

$3000 per acre - $26670
total

$2150 per acre - $19110
total

Annual
Savings

$34 per acre - $302 total

N/A

Breakeven
time

25 years

Funding

The funding resource for our project is the Student Sustainability Committee (SSC). It is the unit
of Student Engagement at the University of Illinois that is charged with leading the student body
toward building a culture of sustainability on campus. Student Sustainability utilizes the
collective agency of students to catalyze pragmatic, solution-oriented, and inclusive change in
our community.With the partnership of a team of staff and faculty members, SSC allocates
$1.47 million annually toward the development and seed-funding of projects that have a positive
environmental impact on the university community. They have six subcommittees that specialize
in one section like education, energy, food waste, transportation, land & water, and other.

Groups will submit their project proposal to at least one of these committees and they will
determine which projects get funding. Our project would be reviewed by the Land & Water
committee.

References

Shock, C. C. (2006). Drip Irrigation: An Introduction.

Chen, J., Fan, W., Li, D., Liu, X., & Song, M. (2020). Driving factors of global carbon footprint pressure:
Based on vegetation carbon sequestration. Applied Energy, 267, 114914.

Nowak, D. J., & Crane, D. E. (2002). Carbon storage and sequestration by urban trees in the USA.
Environmental pollution, 116(3), 381-389.

Frerichs, L., Bleill, L., Faullin, C., Thomas, J., Delorenzo, M., Walden, B., Christy, T., Kim, Q., Knight, B.,
Schmidt, D., Clark, D., Sokolowski, C., Fox, P. B., Ruedi, A. L., McMillan, E. L., Daly, P., Johnson, R.,
Stephens, R., & Ghosh, A. (2018). Research Park at University of Illinois Master Plan 2018.

Institute for Sustainability, Energy, and Environment. (2020). Illinois Climate Action Plan [Strategic
Framework], University of Illinois at Urbana-Champaign. https://icap.sustainability.illinois.edu/

Resilient Landscape Strategy. (2019). [Strategic Framework], Facilities & Services, University of Illinois at
Urbana-Champaign. BteMMIoMsMuM^


-------
Storm Water Management and Erosion Control Ordinance. (2015). Champaign County National Pollutant
Discharge Elimination System.

I EPA, IDOA, and University of Illinois Extension 2021. Illinois Nutrient Loss Reduction Strategy Biennial
Report 2019-2020. Illinois Environmental Protection Agency and Illinois Department of Agriculture;
Springfield, Illinois. University of Illinois Extension; Urbana, Illinois.

https://www2.iiiinois.aov/epa/topics/water-quaiitv/watershed-manaaement/excess-utrients/Documents/NL
SSz^S^ljjBjejgjTjal^R^jBgjl^ONAl-jBdf


-------