OrEPA

GREEN

POWER

PARTNERSHIP

RE-Powering America's Land

Project Matching: Facilitating New Renewable Energy Projects
Project Proposal Submittal Form

The EPA Green Power Partnership's (GPP's) Project Matching Initiative works to connect stakeholders
with new, not-yet-built renewable energy projects that may align with their energy, environmental, and
financial objectives. The initiative's goal is to spur the development of new renewable generation by
facilitating the signing of long-term green power contracts between end-users and project developers,
thereby providing a guaranteed stream of revenue that developers can use to secure project financing.

The GPP, in collaboration with EPA's RE-Powering America's Land Initiative, will host a project matching
webinar on Wednesday, June 24, 2015. Project developers are invited to submit project proposals to
GPP for possible inclusion in the webinar. This form includes all anticipated criteria that EPA will use to
select projects for the webinar. All projects submitted for review that meet minimum requirements for
data completeness and basic eligibility will be posted on the GPP website. A renewable energy project's
inclusion in this initiative does not constitute endorsement or recommendation by EPA.

Project proposals are due by June 5, 2015 and must be submitted electronically to James Critchfield,
critchfield.james@epa.gov.

Contact Information

Robert Gray

rgrav(a)monarchwindpower.com
914-522-0210

Project Summary
Project name: Monarch I

Developer name: Monarch Wind Power LLC

Renewable energy type: Wind

Project city/state: Monmouth, Illinois

Project geographic coordinates (To find, use: www.latlong.net/):

Latitude 40 degrees 49'56	 Longitude -90 degrees 39'39	

Total planned megawatt (MW DC) size: 18.4MW

Are there phases? If so, how many and in what size traunches? No phases.


-------
What is the expected annual output of the completed project (MWh)? 66 million kwh

Expected date of construction commencement: 2016

Expected date of commercial operation: Dec 2016

What is the largest development hurdle and how is it anticipated to be overcome? Long term power
purchase agreement with a creditworthy counterparty

Can you provide examples of similar projects you have developed?

Monarch has consulted on various 20MW studies and has collaborated with developers of much larger
projects.

Site Readiness

Has the project received all necessary federal, state, and local permits to proceed with construction
and operation? If not, please outline the key permits required to proceed with project
construction/operation and describe the steps you have taken in order to evaluate and address
permitting risk for this project.

Have you secured long-term site control? If so, please describe the nature of the agreement (lease,
ownership, etc.)?

Identical 40-year leases with contiguous landowners

Have land leases been filed with the county?

Yes. Warren County itself owns half of the leased land.

Does the project require either an Environmental Impact Statement or Environmental Assessment? If
so, what is the status?

A full NEPA review was completed in 2010 and EPA issued a FONSI on the project. The project also has
received a take permit for the Indiana bat from the USFWS in 2010 (the mitigation protocol has become
the model for all subsequent take permits)


-------
Is this project sited on a current or formerly contaminated land, landfill or mine site?1 If so, has the
site addressed the related environmental issues?

No such issues. Land is 100% arable farm land currently producing corn.

Interconnection

What is the status of interconnection, and have system impact and facility studies been completed?
(Distribution or transmission level projects are both eligible)

Interconnection is to a 69kV distribution line owned by Ameren CIPS and is located on the site. Ameren
has completed interconnection studies and has offered an interconnection contract.

When do you expect the interconnection study process will be complete?

Already complete.

Does the transmission owner (TO) or independent system operator (ISO) have a process to study the
project's impact on the local or regional grid and the subsequent cost to interconnect?

Ameren study concluded that the project actually improved delivery of local power in part because wind
conditions coincide with seasonal operation of nearby grain elevators that are interconnected to the
same distribution line.

Operation & Financing

Is any element of the project - technology or systems - experimental or pilot-phase or proven
technology?

Proven technology including GE's new 2.3MW turbines.

What is the long- and short-term plan for operating and maintaining the project?

Short-term, we will use a GE maintenance contract with local staff for daily monitoring. Longer term,
local staff will monitor.

1 Examples of such properties could include brownfields, municipal solid waste landfills, abandoned mine lands,
and Superfund sites, among others subject to state or federal authorities or cleanup programs.


-------
For wind projects, has a meteorological tower been installed? If yes, when was the tower installed
and how much data has been collected?

Onsite tower was installed in 2009. Two wind studies have been completed using 4 years of wind data
(GE also has estimated the output from our wind data).

Provide a short summary of how you view project finance and structure/ownership taking shape for
this project:

Monarch prefers to retain whole or partial ownership but will entertain sale and other proposals from
reputable investors. Project finance is available from GE Energy but there appear to be plenty of less
expensive options.

Partners

In what ways can organizations participate in the project? (Check all that Apply)

X Power purchase agreement for bundled power and RECs
X Financial hedge or contract for differences
X Long term REC offtake
X Financial investment / ownership stake

~ Other, please specify:	

What are some of the characteristics of your ideal power purchaser, investor, or other partner?

Corporate, University or community off-taker located within MISO that wants a 20-25 year contract,
preferably one that is structured as a difference contract so as to avoided transmission charges (Ameren
study indicates that all of the power actually will be used locally, i.e. within Warren County even at peak
wind periods).

What marketing opportunities exist at the project?

Both marketing and research opportunities are available including naming of the project. Monmouth
College faculty already have participated in wind studies, avian studies and will be engaged in
monitoring for the bat take permit. We envision other research opportunities in collaboration with GE
including drone blade inspections. Monarch's wind study contributed to GE's development of taller
turbines as well as the new 2.3MW turbine with longer blades.


-------