Community Update #78
Pompton Lakes Study Area
Pompton Lakes, New Jersey

Pompton Lake Dredging

Community Update

April 2018

EPA CLEANUP ACTIVITIES
Basic Site Information—2018

The scope of work in 2018 involves
placement of the eco-layer in the
Island Area and the ABD as well as
site restoration. Hydraulic dredging,
processing and off-site disposal of
sediment containing mainly mercury
and lead in a 36-acre area within
Pompton Lake called the Acid
Brook Delta (ABD) is complete.
The work will be performed by The
Chemours Company FC, LLC.,
through its contractor, Sevenson
Environmental Services with EPA/
NJDEP oversight.

Further information/contacts:

Boroiiph of Pompton Lakes

http: //www .pomptonlake sgov .com

EPA Remedial Project Manager

Perry Katz

(212) 637-4426

katz.ira-perry@epa.gov

EPA Community Involvement
Coordinator

Pat Seppi

(646) 369-0068

seppi .pat@epa.gov

EPA continues its presence at
Borough Hall Thursdays from
10AM till 4PM.

EPA's 78th update is to inform the community of the progress of activities

related the dredging performed on the 36-acre portion of the Pompton Lake

Study Area known as the Acid Brook Delta (ABD).

Activities performed (week of April 23rd):

~	Final two loads of remnant material from demobilization activities
transported off-site—2,817 loads transported off-site to date..

~	Performed mechanical and hydraulic placement of ecological layer (i.e.
sand) material in the ABD.

~	Six-inch eco-layer placement complete along shoreline in southern and
western portion of ABD.

~	Lake turbidity/ perimeter air (dust) monitoring continues for ecological
layer placement/restoration — monitoring data posted at
www.pomptonlakesworks.com/pompton-lake-project/environmental-
monitoring.

Activities scheduled (week of April 30rd):

~	Continue placement of ecological layer within northern and eastern are-
as of the ABD.

~	Mobilize to Island Area to begin eco-layer placement and restoration
activities.

~	Receive trucks delivering ecological material on a daily basis.

~	Continue routine inspection of site work areas per approved permits
and for safety purposes.

~	Continue lake turbidity/perimeter air (dust) monitoring.

Notes:

THERE WILL BE NO WORK ON SATURDAY, APRIL 28TH.

THERE WILL BE INCREASED TRUCK TRAFFIC DURING THIS
PHASE DUE TO THE DELIVERY OF ECOLOGICAL MATERIAL
(i.e. SAND). TRAFFIC CONTROLS WILL BE IN PLACE.

THANKS TO THOSE THAT ATTENDED EPA'S PUBLIC AVAILA-
BILITY SESSION ON APRIL 24TH! THE PRESENTATION AND
FACT SHEET WILL BE PLACED ON EPA'S WEBSITE.

PHOTO: THE PHOTO SHOWS THE COVERING OF THE ECO-
LOGICAL LAYER STOCKPILE AT THE END OF THE WORK
DAY.


-------