VERSION 2

Indoor AirPlus

Builder Responsibilities

Version 2 of the Indoor AirPlus program includes specifications that are the exclusive responsibility of the builder to implement for each
certified home/building.This document includes the consolidated list of specifications designated as "Builder Responsibility" from the
Version 2Verification Checklist and a signature line for the builder to sign in affirmation that they have met those requirements for the
home listed on the checklist, or that they will meet those requirements for all the dwelling units in the associated building or
development/community.

Builder Responsibilities

1.	It is the exclusive responsibility of builders to ensure that each certified home is constructed to meet the Indoor AirPlus requirements
identified as "Builder Responsibility!'

2.	While builders are not required to maintain documentation demonstrating compliance for each individual certified home, builders are
required to develop a process to ensure compliance for each certified home (e.g., incorporate these requirements into the Scope of
Work for sub-contractors, require a site supervisor to inspect each home for these requirements, and/or sub-contract the verification
of these requirements to aVerifier).

3.	A Builder representative is required to review these Items with a representative of the Verification Organization and attest to their
compliance at least once per development/community by signing using the IAP Builder Responsibilities form.The Verifier shall retain
the signature page with IAP certification documentation for the home or the development/community.The form may be signed and
retained either physically or electronically.

4.	In the event that the EPA determines that a certified home was constructed without meeting these requirements, the home may be
decertified.

The Items in this form are summaries of the more detailed specifications. For complete details regarding the Items identified
as Builder Responsibilities, please reference the Indoor AirPlus Version 2 Verification Requirements document.

July 2024

www.epa.gov/indoorairplus

Indoor Air Quality (IAQ)


-------


Indoor AirPlusVersion 2 Builder Responsibilities

(Refer to full Indoor AirPlus Verification Requirements for details)

OMB Control Number 2060-NEW
Approval Expires: Pending Approval

Location Information:

Home/Buildina Address: Citv: State: Zip Code:

Property/Development Name: Number of Units (Multifamily only):



Climate Zone (0-7):

Moisture Zone (A-C): EPA Radon Zone (1-3):

Section 1

- Moisture Control

Water-Managed Site and Foundation



1.1.2

Newlv installed backfill tamped and final arade sloped 2 0.5 in. per ft.

Exception: Swales/drains Professional verified soils Graded after settling



1.2.1

Newlv installed foundations, drain tile or CFDS is installed to discharae outside.
Exceptions: Professional verified Group 1 soils



1.2.2

Sump cover is mechanically attached.

1.2

1.2.3

Sump drainage discharges 2 5 ft. from the foundation or into approved stormwater system.
Exception: Discharge professionally designed or verified Group 1 Soils



1.4.1

Under newlv installed slabs, aaareaate OR sand with aeotextile mattina is installed.
Exceptions: Professional verified Group 1 Soils



1.4.2

Under newlv installed slabs. Class A or Class B vaoor retarder is installed.

1.4

1.4.3

Crawlspaces without slabs, Class A vapor retarder installed with penetrations/seams/edges overlapped and sealed.



1.4.4

Existina slabs in Moist (A) Zones where Items 1.4.1 and 1.4.2 cannot be confirmed, a continuous/sealed Class I vaoor retarder
installed on top of slab. For occupiable spaces, vapor retarder is either a durable floor surface or covered by one.



1.4.5

Caoillarv break installed between the foundation wall (or slab) and newlv installed sill plates.

1.5

1.5.1

Newlv installed below-qrade concrete/masonrv walls damp-proofed: wood framed walls waterproofed.

Water-Managed Wall Assemblies



1.6.1

Continuous water-resistive barrier installed behind cladding and a bond-break drainage plane for non-structural masonry
assemblies.

1.6

1.6.2

Flashing/drainage system at all horizontal interruptions and bottom of exterior walls.



1.6.3

Weep holes for masonry veneer and/or weep screed for stucco cladding.

1.7

1.7.1

Newlv installed windows and doors fullv flashed.

Water-Managed Roof Assemblies

1.8

1.8.1 Gutter system discharges 2 5 ft. from foundation, into underground catchment, or sewer/rainwater management system.

Exceptions: ¦ Slab-on-grade I Dry (B) Climates ¦ Professional verified soils ¦ Rock bed w/liner 1 Rainwater harvesting
system Continuous rubber membrane Waterproofed foundation walls



1.8.2

If utilizing any exception in 1.8.1, extra protection for splash damage is included.



1.9.1

Newlv installed roof-to-wall intersections and roof penetrations fullv flashed.

1.9

1.9.2

Newlv installed roofina includes kickout flashina installed at low end of roof-to-wall intersections and roof deck flashina
integrated with drainage plane.

1.10

1.10.1

Newlv installed roofina includes self-adherina bituminous membrane at vallevs and roof penetrations.
Exception: 2021 IRC Section R905 option(s)

1.10.2

Newlv installed low sloped or flat roofs are sloped 2 0.25 in. per ft. to drains or scuppers and drains are insulated throuah roof
assembly: roof assembly air control layers fully connected to wall air control layers and water control layers overlap.

1.11

1.11.1 Newlv installed roofina. CZ 4 and up. include ice barrier in accordance with 2021 IRC R905.1.2.
Exception: Gut rehabilitation with R-49 Grade I attic insulation, if vented.



1.11.2

Gaps and penetrations between vented attics and conditioned spaces are sealed.

Interior Moisture Management

1.12

1.12.1

Moisture-resistant backing material behind tub and shower enclosures with tile or panel assemblies.

Section 2-

Radon



2.1

2.1.3

In EPA Radon Zone 3. provide occupants in 1-2 familv dwellings w/ EPA's Basic Radon Facts.

Where a newly installed passive or active radon system is included, builders are required to include the features in Items 2.2.1.1 through 2.2.1.3.

2.2

2.2.1.1

Capillary break and soil gas vapor retarder installed according to Specification Items 1.4.1 through 1.4.4.



2.2.1.2

Vent pipe clearly labeled, connected to an open T-fitting with 10' (min.) horizontal pipe under the vapor retarder, terminating
outdoors a minimum of 12 in. above the roof. No suction points on sump lids.



2.2.1.3

Foundation drainage system that discharges to daylight and is connected to soil gas collection plenum has backwater valve
installed.

Indoor AirPlus Version 2 Builder Responsibilities


-------
Section 7 - Occupant Education

7.1

7.1.1 Instruction manuals provided for the followina newlv installed appliances and svstems.

¦	HAC systems and accessories

¦	Local and dwelling-unit ventilation systems

¦	Kitchen and bath exhaust systems

¦	Air cleaners

¦	Dehumidifiers

¦	Moisture and/or IAQ monitors

¦	Combustion appliances

¦	Sump pumps
Radon systems

7.1.2 Owner-occupied units: O&M recommendations and filter change schedule provided.

Builder Organization



Builder Representative



Builder Signature

Date

This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2060-New). Responses to this collection of information are
voluntary (Section 103(a) of the Clean Air Act). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid
OMB control number.The public reporting and recordkeeping burden for this collection of information is estimated to .5 hours per response. Send comments on the Agency's need for this
information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent Burden to the Regulatory Support Division Director, U.S. Environmental
Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.

EPA Form No. 5900-668

Indoor AirPlusVersion 2 Builder Responsibilities

Office of Air and Radiation
EPA402/B-24/005


-------