Community Update #77
Pompton Lakes Study Area
Pompton Lakes, New Jersey

Pompton Lake Dredging

Community Update

April 2018

EPA CLEANUP ACTIVITIES
Basic Site Information—2018

The scope of work in 2018 involves
placement of the eco-layer in the
Island Area and the ABD as well as
site restoration. Hydraulic dredging,
processing and off-site disposal of
sediment containing mainly mercury
and lead in a 36-acre area within
Pompton Lake called the Acid
Brook Delta (ABD) is complete.
The work will be performed by The
Chemours Company FC, LLC.,
through its contractor, Sevenson
Environmental Services with EPA/
NJDEP oversight.

Further information/contacts:

Boroiiph of Pompton Lakes

http: //www .pomptonlake sgov .com

EPA Remedial Project Manager

Perry Katz

(212) 637-4426

katz.ira-perry@epa.gov

EPA Community Involvement
Coordinator

Pat Seppi

(646) 369-0068

seppi .pat@epa.gov

EPA continues its presence at
Borough Hall Thursdays from
10 a.m. till 4p.m.

EPA's 77th update is to inform the community of the progress of activities
related to the dredging performed on the 36-acre portion of the Pompton
Lake Study Area known as the Acid Brook Delta (ABD).

Activities performed (week of April 16th):

~	Completed demobilization/disassembly of water treatment equipment.

~	Performed mechanical and hydraulic placement of ecological layer (i.e.
sand) material in the ABD.

~	Turbidity/dust monitoring in progress for ecological layer placement/
restoration — monitoring data posted at

www.pomptonlakesworks.com/pompton-lake-project/environmental-
monitoring.

Activities scheduled (week of April 23rd):

~	Continue placement of ecological layer within the ABD.

~	Receive trucks delivering ecological material on a daily basis.

~	Continue routine inspection of site work areas per approved permits
and for safety purposes.

~	Continue lake turbidity/perimeter air (dust) monitoring.

Note:

THERE WILL BE WORK ON SATURDAY, APRIL 21ST FROM 8
a.m.TILL 5 p.m. WORK WILL INVOLVE EQUIPMENT MAINTE-
NANCE. GATES WILL CLOSED WHEN POSSIBLE.

EPA WILL BE A VAILABLE TO THE PUBLIC ON TUESDA Y, APRIL
24THAT THE CARNEVALE CENTER FROM 10 a.m. UNTIL 8p.m.
TO DISCUSS THE SCOPE OF WORK/ANSWER QUESTIONS RE-
GARDING ACTIVITIES ON POMPTON LAKE FOR 2018 INCLUD-
ING ECOLOGICAL PLACEMENT AND RESTORATION ACTIVI-
TIES.

THERE WILL BE INCREASED TRUCK TRAFFIC DURING THIS
PHASE DUE TO THE DELIVERY OF ECOLOGICAL MATERIAL
(i.e. SAND). TRAFFIC CONTROLS WILL BE IN PLACE.

PHOTO: THE PHOTO SHOWS THE PLACEMENT OF ECOLOG-
ICAL LAYER MATERIAL IN A CONVEYOR BELT HOPPER FOR
HYDRAULIC PLACEMENT IN THE ABD.


-------